Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral
DIY
ii
DAFTAR ISI ........................................................................................................................................... ii
DAFTAR TABEL ................................................................................................................................... iii
DAFTAR GAMBAR ............................................................................................................................... iv
BAB 1 PENDAHULUAN ................................................................................................................... 1
1.1. Latar Belakang ................................................................................................................................. 1
1.2. Maksud, Tujuan dan Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum
Perumahan dan Energi Sumber Daya Mineral DIY ................................................................. 2
1.2.1. Maksud Perubahan Renja Dinas Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral Tahun 2020 ................................................................................. 2
1.2.2. Tujuan Perubahan Renja Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral DIY Tahun 2020 ......................................................................... 4
1.2.3. Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum
Perumahan dan Energi Sumber Daya Mineral DIY Tahun 2020 .............................. 4
BAB 2 EVALUASI RENJA ............................................................................................................... 5
BAB 3 RENCANA KERJA DAN PENDANAAN PERANGKAT DAERAH ...................................... 62
BAB 4 PENUTUP ........................................................................................................................... 85
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
iii
DAFTAR TABEL Tabel 2.1 Sasaran Renja Tahun 2020 Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral DIY ........................................................................................... 7
Tabel 2.2 Rumusan Rencana Program dan Kegiatan Dinas Pekerjaan Umum
Perumahan dan ESDM DIY Tahun 2020 dan Perkiraan Maju Tahun 2021 ................... 10
Tabel 2.3 Program, Kegiatan dan Paket Pekerjaan 2020 melalui BLP (status 30 Juni 2020) ...... 20
Tabel 2.4 Evaluasi Renja Dinas Pekerjaan Umum Perumahan dan ESDM DIY .......................... 21
Tabel 3.1 Perubahan Rencana Kerja 2020 Dinas Pekerjaan Umum Perumahan dan
Energi Sumber Daya Mineral DIY ................................................................................ 63
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
iv
DAFTAR GAMBAR Gambar 1.1 Hubungan Dokumen Rencana Pembangunan Daerah dengan Dokumen
Rencana Perangkat Daerah .................................................................................... 2
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
1
Pelaksanaan Urusan Pemerintahan bidang Pekerjaan Umum dan bidang Perumahan dan
Permukiman merupakan urusan wajib Pemerintah Daerah terkait Pelayanan Dasar yaitu melaksanakan
ketugasan penyediaan infrastruktur dasar (basic infrastructure) yang terdiri dari pelayanan di Sub Urusan
Sumber Daya Air, Sub Urusan Jalan, Sub Urusan Keciptakaryaan serta Sub Urusan Perumahan Rakyat
dan Kawasan Permukiman. Penyediaan infrastruktur dasar bagi seluruh lapisan masyarakat DIY tersebut
disenggarakan dalam rangka untuk peningkatan ekonomi lokal, pemberdayaan masyarakat, peningkatan
layanan masyarakat, dan kelestarian lingkungan. Sedangkan urusan pilihan pemerintah daerah yang
dikelola oleh DPUP-ESDM adalah Sub Urusan Energi dan Sumber Daya Mineral yang ditujukan untuk
membangun keamanan energi, keadilan energi, keberlanjutan lingkungan, serta peningkatan akses energi
masyarakat.
Rencana Kerja (Renja) Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral
(DPUP-ESDM) DIY adalah dokumen perencanaan untuk periode 1 (satu) tahun, yang memuat program,
kegiatan, lokasi, dan kelompok sasaran yang disertai indikator kinerja dan pendanaan sesuai dengan tugas
dan fungsi setiap Perangkat Daerah, yang disusun berpedoman kepada Renstra Perangkat Daerah dan
RKPD.
Pembangunan Nasional sebagaimana diatur dalam Undang-Undang Nomor 25 Tahun 2004, juga
memperhatikan Peraturan Menteri Dalam Negeri Nomor 86 Tahun 2017 tentang Tata Cara Perencanaan,
Pengendalian, dan Evaluasi Pembangunan Daerah, Tata Cara Evaluasi Rancangan Peraturan Daerah
tentang Rencana Pembangunan Jangka Panjang Daerah dan Rencana Pembangunan Jangka Menengah
Daerah, serta Tata Cara Perubahan Rencana Pembangunan Jangka Panjang Daerah, Rencana
Pembangunan Jangka Menengah Daerah, dan Rencana Kerja Pemerintah Daerah.
Sebagai dokumen perencanaan pembangunan daerah maka Renja Dinas PUP-ESDM DIY
merupakan satu kesatuan dalam sistem perencanaan pembangunan. Ruang lingkup perencanaan
pembangunan daerah meliputi tahapan, tata cara penyusunan, pengendalian dan evaluasi pelaksanaan
rencana pembangunan daerah, yang terdiri atas RPJPD, RPJMD, dan RKPD yang menjadi dasar dalam
penyusunan rencana perangkat daerah yang terdiri Renstra SKPD dan Renja PD. Hubungan dokumen
Perencanaan Pembangunan Daerah dan Dokumen Perencanaan Perangkat Daerah disajikan pada
gambar berikut ini.
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
2
Gambar 1.1. Hubungan Dokumen Rencanan Pembangunan Daerah dengan Dokumen Rencana
Perangkat Daerah
Berdasarkan pemahaman tersebut maka Renja perangkat daerah harus berpedoman kepada Dokumen
Rencana Pembangunan Daerah yang meliputi RPJPD, RPJMD dan RKPD yang telah ditetapkan oleh
pemerintah daerah serta Renstra PD, dalam hal penentuan indikator, target capaian, program dan kegiatan
serta pagu pendanaan, dimana RKPD dan Renstra harus berpedoman pada Program yang terdapat dalam
RPJMD. Selanjutnya Renja perangkat daerah harus sesuai dengan kebijakan yang tercantum dalam
Renstra perangkat daerah, yaitu penetapan tujuan, sasaran, program dan kegiatan serta indikator program
(outcome) dan kegiatan (output). Sehingga perubahan terhadap RKPD mengharuskan Perangkat Daerah
juga melakukan perubahan pada Rencana Kerja.
1.2. Maksud, Tujuan dan Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum
Perumahan dan Energi Sumber Daya Mineral DIY
1.2.1. Maksud Perubahan Renja Dinas Dinas Pekerjaan Umum Perumahan dan Energi Sumber
Daya Mineral Tahun 2020
Pelaksanaan program/kegiatan sampai dengan Triwulan II Tahun Anggaran 2020, telah terjadi
perubahan mendasar yang menyebabkan perlunya dilakukan penyesuaian dan perubahan terhadap Renja
DPUP-ESDM Tahun 2020. Perubahan Renja sebagaimana diatur melalui Peraturan Menteri Dalam Negeri
Nomor 86 Tahun 2017 tentang Tata Cara Perencanaan, Pengendalian, dan Evaluasi Pembangunan
Daerah, Tata Cara Evaluasi Rancangan Peraturan Daerah tentang Rencana Pembangunan Jangka
Panjang Daerah dan Rencana Pembangunan Jangka Menengah Daerah, serta Tata Cara Perubahan
Rencana Pembangunan Jangka Panjang Daerah , Rencana Pembangunan Jangka Menengah Daerah,
DITJEN BINA BANGDA
Dokumen Rencana Perangkat Daerah
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
3
dan Rencana Kerja Pemerintah Daerah, pada pasal 343 ayat (1) yang menyebutkan bahwa Perubahan
RKPD dan Renja Perangkat Daerah dapat dilakukan apabila berdasarkan hasil evaluasi pelaksanaannya
dalam tahun berjalan menunjukan adanya ketidaksesuaian dengan perkembangan keadaan, meliputi:
a) Perkembangan yang tidak sesuai dengan asumsi prioritas pembangunan daerah, kerangka
ekonomi daerah dan keuangan daerah, rencana program dan kegiatan RKPD berkenaan; dan/atau
b) Keadaan yang menyebabkan saldo anggaran lebih tahun anggaran sebelumnya harus digunakan
untuk tahun berjalan.
Lebih lanjut dalam pasal tersebut pada ayat (4) disebutkan bahwa Perubahan RKPD sebagaimana
dimaksud ayat (1) dapat dilakukan tanpa melalui tahapan evaluasi dalam hal terjadi kebijakan nasional,
keadaan darurat, keadaan luar biasa, dan perintah dari Peraturan Perundang-undangan yang lebih tinggi
setelah RPJMD ditetapkan.
Kejadian wabah pandemi Corona Virus Disease 2019 (Covid-19) yang melanda dunia telah banyak
menyebabkan banyak korban jiwa, tidak terkecuali di Indonesia dan Daerah Istimewa Yogyakarta. Hal ini
mendasari ditetapkannya kondisi Bencana Nasional Non Alam oleh Presiden Republik Indonesia melalui
Keputusan Presiden Republik Indonesia Nomor 12 Tahun 2020 yang ditindaklanjuti dengan penetapan
Tanggap Darurat Bencana Daerah Istimewa Yogyakarta oleh Gubernur DIY melalui Keputusan Gubernur
Daerah Istimewa Yogyakarta Nomor 65/KEP/2020. Kondisi bencana daerah ini menjadikan perlu dilakukan
tindakan-tindakan re-focusing dan re-alokasi program kegiatan pembangunan yang tercantum di
Perubahan RKPD sebagaimana termaktub dalam Peraturan Menteri Dalam Negeri Nomor 86 Tahun 2017
pasal 343 ayat (4) yang telah disampaikan di atas.
Perubahan Renja Dinas PUP-ESDM DIY dimaksudkan untuk menyelaraskan terhadap Perubahan RKPD
Tahun 2020 yang ditetapkan dengan Peraturan Kepala Daerah dan menjadi landasan penyusunan
penyusunan Kebijakan Umum Perubahan Anggaran (KUPA) dan Prioritas Plafon Anggaran Sementara
Perubahan (PPASP) Tahun 2020 yang disepakati bersama antara Gubernur dengan Dewan Perwakilan
Rakyat Daerah (DPRD) Daerah Istimewa Yogyakarta.
Sehubungan dengan hal-hal tersebut di atas, untuk menjamin konsistensi antara perencanaan
pembangunan daerah, rencanan perangkat daerah serta penganggaran, maka perlu disusun Perubahan
Rencana Kerja Dinas PUP-ESDM Tahun 2020.
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
4
1.2.2. Tujuan Perubahan Renja Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya
Mineral DIY Tahun 2020
Berdasarkan penjelasan di atas, tujuan Perubahan Renja Dinas PUP-ESDM Tahun 2020 adalah:
a) Melakukan penyesuaian program dan kegiatan terkait adanya wabah pandemi virus Covid-19 yang
memerlukan penanganan secara cepat dengan memperhatikan prioritas nasional, regional dan
daerah;
b) Melakukan penyesuaian berdasarkan asumsi makro ekonomi yang telah disepakati pada APBD
Tahun 2020 terhadap kemampuan fiskal daerah;
c) Melakukan penyesuaian terhadap Perubahan RKPD Tahun 2020;
d) Menyediakan dokumen perencanaan tahunan sebagai acuan dalam pelaksanaan
program/kegiatan sesuai dengan tugas pokok dan fungsi Dinas PUP-ESDM DIY dalam rangka
mencapai visi dan misi Pemerintah DIY.
e) Menjadi dasar penambahan kegiatan baru, penghapusan kegiatan, perubahan indikator kinerja,
perubahan target, dan perubahan pagu anggaran.
1.2.3. Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral DIY Tahun 2020
Dasar pertimbangan Perubahan Rencana Kerja Dinas PUP-ESDM Tahun 2020 mencakup hal-hal pokok
sebagai berikut:
1. Adanya wabah pandemi virus Covid-19 yang memerlukan penanganan tindakan re-focusing dan
re-alokasi program kegiatan Tahun 2020.
2. Adanya penyesuaian asumsi kerangka ekonomi daerah dan kerangka pendanaan dengan
perkembangan kondisi terkini;
4. Adanya penambahan kegiatan baru, penghapusan kegiatan, perubahan indikator kinerja, target,
lokasi, serta pagu anggaran.
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
5
BAB 2 EVALUASI RENJA
Dinas PUPESDM DIY adalah dinas daerah yang mempunyai hubungan dengan dua kementerian
terkait pelaksanaan urusan pemerintahan konkuren, yaitu : Kementerian Pekerjaan Umum Dan Perumahan
Rakyat dan Kementerian Energi dan Sumberdaya Mineral, sehingga kebijakan nasional dari kedua
kementerian tersebut menjadi acuan pelaksanaan kebijakaan di daerah.
Kementerian Pekerjaan Umum dan Perumahan Rakyat yang menangani infrastruktur pekerjaan
umum dan perumahan rakyat sebagai bagian dari bidang infrastruktur berkewajiban untuk mendukung hal
tersebut melalui pelaksanaan pembangunan yang terpadu, efektif dan efisien dengan memperhatikan
pengarusutamaan pembangunan yang berkelanjutan, gender serta berlandaskan tata kelola pemerintahan
yang baik dalam proses pencapaian tujuan pembangunan nasional.
Pengarusutamaan pembangunan berkelanjutan merupakan upaya penerapan prinsip
pembangunan berkelanjutan secara seimbang dan sinergis dalam memenuhi kebutuhan sekarangtanpa
mengorbankan pemenuhan kebutuhan generasi masa depan. Dalam pelaksanaanpembangunan
berkelanjutan diperlukan keterpaduan antara 3 (tiga) pilar yaitu sosial, ekonomi dan lingkungan yang
kemudian diperkuat dengan dimensi kelembagaan.
Pelaksanaan pembangunan berkelanjutan secara umum tercermin dalam indikator–indikator
antara lain: (1) indikator ekonomi makro seperti pertumbuhan ekonomi dan dampak ekonomi; (2) tingkat
partisipasi masyarakat pelakupembangunan, partisipasi masyarakat marginal/minoritas (kaum miskin dan
perempuan), dampak terhadap struktur sosial masyarakat, serta tatanan atau nilai sosial yang berkembang
di masyarakat; dan (3) dampak terhadap kualitas air, udara dan lahan serta ekosistem (keanekaragaman
hayati).
infrastruktur pekerjaan umum dan perumahan rakyat, harus selalu berlandaskan pada prinsip
pembangunan berkelanjutan yang memperhatikan daya dukung agar hasil pembangunan selaindapat
dimanfaatkan untuk generasi sekarang juga dapat diwariskan pada generasi mendatang.
Kondisi yang dikemukakan oleh Kementerian Pekerjaan Umum yang mempengaruhi kondisi
Daerah Istimewa Yogyakarta di antaranya adalah :
a. Menurunnya fungsi jaringan irigasi, disebabkan oleh tingginya tingkat kerusakan karena umur
konstruksi dan bencana alam disamping rendahnya keterlibatan petani dan stakeholders lainnya
dalam pengelolaan jaringan irigasi, sehingga menurunnya kinerja layanan jaringan irigasi yang ada
dalam mendukung pemenuhan produksi pangan.
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
6
b. Berkembangnya daerah permukiman dan industri telah menurunkan area resapan air dan
mengancam kapasitas lingkungan dalam menyediakan air.
c. Target tingkat pelayanan air minum saat ini belum mampu terpenuhi.
d. Upaya meningkatkan kinerja TPA yang berwawasan lingkungan di Perkotaan Yogyakarta sampai
saat ini belum menunjukkan hasil yang menggembirakan.
e. Dalam penanganan air limbah jumlah keluarga yang memiliki akses terhadap sarana sanitasi dasar
meningkat, namun pencapaian tersebut masih sebatas pada akses ke jamban dan toilet saja.
f. Tingkat pemenuhan kebutuhan rumah masih menjadi permasalahan, sementera itu, setiap tahun
terjadi penambahan kebutuhan rumah akibat penambahan keluarga baru.
g. Implementasi kebijakan pembinaan jasa konstruksi, dalam konteks mikro (tata kelola
kepemerintahan yang baik), konteks messo (usaha dan pengusahaan konstruksi), serta konteks
makro (kerjasama, persaingan global dan liberalisasi jasa konstruksi) belum mencapai sasaran
secara optimal. Masih sering dijumpai mutu konstruksi yang belum memenuhi standar.
Adapun kondisi yang dikemukakan oleh Kementerian Energi dan Sumber Daya Mineral yang
mempengaruhi kondisi Daerah Istimewa Yogyakarta di antaranya adalah:
a. Penurunan produksi minyak dan gas bumi nasional, sehingga disisi hilir pemerintah masih harus
mengimpor dalam jumlah relative besar untuk memenuhi kebutuhan bakar di dalam negeri;
b. Bauran Energi (emergi mix) Nasional masih didominasi oleh BBM;
c. Belum optimalnya pengembangan energi alternatif pengganti BBM;
d. Belum optimalnya pemanfaatan gas bumi dalam negeri;
e. Belum optimalnya investasi untuk pengembangan sektor energi dan sumberdaya mineral,
dikarenakan tumpang tindihnya wilayah pertambangan dengan kehutanan, perkebunan, lamanya
pinjam pakai wilayah kehutanan;
pendanaan ketenagalistrikan oleh pemerintah;
g. Masih banyaknya perizinan Pertambangan di daerah yang belum mengikuti kaidah pertambangan
yang baik dan benar, serta masih maraknya aktivitas pertambangan rakyat yang illegal;
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
7
h. Konservasi air tanah di cekungan air tanah menghadapi kendala dengan makin maraknya aktivitas
pengambilan air tanah tanpa izin serta pengambilan air tanah yang kurang terkendali terutama di
kawasan perindustrian dan kota besar.
Rumusan pernyataan tujuan dan sasaran Renja Dinas PUPESDM DIY beserta indikator kinerjanya
disajikan dalam Tabel 2.1 .
NO. PROGRAM INDIKATOR KINERJA SATUAN TARGET
1.03 PEKERJAAN UMUM
1 Program Administrasi
Penanganan sampah sistem regional
5 Program Pengelolaan dan Pengembangan Sistem
Penyediaan Air Minum
liter/detik 750
m 91.174
Pengelolaan Air Baku % 62,40
7 Program Pengembangan dan
Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
% 74,50
Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
% 77,82
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
8
8 Program Penyelenggaraan Jalan Jaringan jalan provinsi dalam kondisi mantap
% 74,06
% 75,13
LHU 800
% 32,43
% 12
% 72,16
titik
48
titik
32
MINERAL
RT 9.848 RT
unit 72
izin 45
dan Geologi
dusun 76
% < 20%
izin 45
izin 26
% 7,6
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
9
Yogyakarta menetapkan rangkaian program sesuai dengan Urusan Wajib dan Urusan Pilihan yang
dilaksanakan oleh SKPD di lingkungan Pemerintah Daerah Istimewa Yogyakarta.
Penetapan program dan kegiatan disesuaikan dengan :
1. Penanggulangan kemiskinan;
2. Pengembangan daerah terisolir;
3. Program strategis daerah;
4. Pendayagunaan potensi sumber daya air, energi dan sumber daya mineral;
5. Visi Gubernur dalam lima tahun mendatang (2017-2022) yaitu Menyongsong "Abad Samudera
Hindia" untukKemuliaan Martabat Manusia Jogja.
Sesuai dengan arahan RPJMD, RKPD dan Perubahan RENSTRA 2017 – 2022 Dinas PUPESDM DIY,
pada tahun 2020 Dinas PUPESDM DIY akan melaksanakan urusan wajib Pekerjaan Umum, Perumahan
dan urusan pilihan Energi Sumber Daya Mineral melalui 14 program dengan 44 kegiatan. Rincian Program
dan Kegiatan Tahun 2020 dapat disajikan pada Tabel 2.2. dan Evaluasi Renja Dinas PUPESDM DIY yang
telah mengacu pada Perubahan RKPD 2020 dan Perubahan Renstra Dinas PUPESDM DIY disajikan pada
Tabel 2.4.
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
10
Tabel 2.2. Rumusan Rencana Program dan Kegiatan Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY Tahun 2020 dan Prakiraan Maju Tahun 2021
Kode Urusan/Bidang Urusan Pemerintahan Daerah dan Program/Kegiatan
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
192.377.967.000 456.835.563.240
Terwujudnya administrasi perkantoran yang mendukung kelancaran tugas dan fungsi SKPD
DIY 100 % 15.883.984.000
APBD 100 % 20.000.000.000
Alat Listrik DIY 124 jenis 12.220.000.000
APBD pemenuhan pelayanan admistrasi perkantoran 100%
12.000.000.000
Barang Cetakan 35 jenis
Belanja pengisian tabung tabung pemadam kebakaran 25 unit
Jasa kebersihan kantor 1 tahun
Jasa Komunikasi, Listrik, Air 1 tahun
Jasa Laundry 1 tahun
Jasa Pembasmi tikus 1 tahun
jasa Pemeliharaan dan Perizinan Kendaran Dinas/Operasional 108 unit : 76 unit roda 2; 3 unit Roda 3; 22 unit roda 4; 7 unit roda 6
Jasa Surat Menyurat 7500 surat
Penatan Arsip 76000 arsip
Surat Kabar/Majalah 10 SKH
Jasa Keamanan Kantor DIY 1 tahun 2.136.000.000
APBD pemenuhan pelayanan admistrasi perkantoran 100%
5.000.000.000
1.03.1.03.01.00.01.035 Penyediaan Rapat- Rapat, Koordinasi dan Konsultasi
Konsultasi dan Koordinasi Dinas PUP ESDM DIY Dalam Daerah Terlaksana Dengan Baik
DIY 1 tahun - Golongan IV, 100 kali - Golongan III, 500 kali - Golongan II, 250 kali
1.527.984.000
3.000.000.000
Konsultasi dan Koordinasi Dinas PUP ESDM DIY Dalam Jawa Terlaksana Dengan Baik
1 tahun - Golongan IV, 100 kali - Golongan III, 100 kali - Golongan II, 50 kali
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
11
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Konsultasi dan Koordinasi Dinas PUP ESDM DIY Luar Jawa Terlaksana Dengan Baik
1 tahun - Golongan IV, 50 kali - Golongan III, 50 kali - Golongan II, 50 kali
Makan dan minum rapat tersedia sesuai kebutuhan
7500 OS
Persentase ketersediaan sarana prasarana aparatur yang mendukung kelancaran tugas dan fungsi SKPD
DIY 100 % 3.515.000.000
APBD 100 % 9.750.000.000
Tersedianya Mebeleuir : - Meja Kerja DIY - 9 unit 450.000.000
APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
2.000.000.000
- 12 unit - 5 unit - 2 unit
Tersedianya perlengkapan kantor : - Komputer - Printer - UPS - Laptop - Scanner
- 10 Unit - 9 unit - 30 unit - 5 unit - 1 unit
1.03.1.03.01.00.02.109. Pemeliharaan Rumah dan Gedung Kantor
Pemeliharaan bangunan gedung tempat kerja DIY 3 gedung :11.941 m2 1.200.000.000 APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
1.500.000.000
1.03.1.03.01.00.02.112. Pemeliharaan Kendaraan Dinas/Operasional
terpeliharanya kendaraan dinas/operasional SKPD
DIY 108 unit : 76 unit roda 2; 3 unit Roda 3; 22 unit roda 4; 7 unit roda 6
1.500.000.000 APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
2.500.000.000
1.03.1.03.01.00.02.111.
DIY - 3 unit - 2 unit - 8 unit
365.000.000 APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
3.750.000.000
1 unit
Pemeliharaan alat-alat kantor: - Sound System - Komputer - Laptop - Monitor - CPU - Hardisk - Printer
- 1 tahun - 80 kali - 48 kali - 10 buah - 8 buah - 8 buah - 20 buah
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
12
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1 tahun
Pemeliharaan perlengkapan kantor: - AC - CCTV - Accu Solar Cell - Faksimili - Mesin Ketik
- 100 kali - 1 tahun - 1 tahun - 5 unit - 3 unit
1.03.1.03.01.00.06 PROGRAM PENINGKATAN PENGEMBANGAN SISTEM PELAPORAN CAPAIAN KINERJA DAN KEUANGAN
Persentase ketersediaan sarana prasarana aparatur yang mendukung kelancaran tugas dan fungsi SKPD
DIY 100 % 730.000.000
APBD 100 % 765.000.000
1.03.1.03.01.00.06.016 Penyusunan Laporan Kinerja SKPD
Bahan penyusunan LKPJ dan LKJ Urusan PU,Perumahan & ESDM TH 2019 DIY 2 dokumen Bahan penyusunan LKPJ dan LKJ Urusan PU, Perumahan & ESDM TH 2019
15.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
15.000.000
1.03.1.03.01.00.06.017 Penyusunan Laporan Keuangan SKPD
Laporan Aset dan Laporan Persediaan Semesteran DIY 2 laporan 120.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
120.000.000
Laporan Keuangan Semester 2 laporan
Laporan Keuangan Tahunan Gabungan 1 laporan
Laporan Keuangan Audited 1 laporan
Laporan Keuangan bulanan 12 laporan
Laporan Keuangan Triwulan 4 laporan
1.03.1.03.01.00.06.018 Penyusunan Rencana Program Kegiatan SKPD serta Pengembangan Data dan Informasi
DPA 2020 DIY 1 dokumen 565.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
600.000.000
Forum PD 1 kesepakatan
Publikasi Publikasi media cetak dan publikasi media elektronik
Renja SKPD Perubahan TH 2020 1 dokumen
Renja SKPD TH 2021 1 dokumen
ROPK 2020 1 dokumen ROPK
tenaga pendamping SKPD 6 bulan
1.03.1.03.01.00.06.019 Monitoring dan Evaluasi Pelaksanaan Program Kegiatan SKPD
Laporan Monitoring dan Evaluasi Pelaksanaan Program Dan Kegiatan SKPD
DIY 12 laporan Monitoring dan Evaluasi Pelaksanaan Program Dan Kegiatan SKPD
30.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
30.000.000
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
13
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1.03.1.03.01.00.52. PROGRAM PENYELENGGARAAN JALAN
1. Jaringan jalan provinsi dalam kondisi mantap 2. Penambahan Jaringan Jalan Baru
DIY 1. 74,06% 2. 46,99 %
97.833.269.000 APBD 1. 74,66 % 2. 69,11 %
226.118.416.240
1.03.1.03.01.00.52.001. Peningkatan/Rehabilitasi Jalan dan Jembatan
Peningkatan Ruas Jalan Brosot-Toyan DIY 2 KM 29.600.000.000 APBD Peningkatan 17,070 Km jaringan jalan dari kondisi rusak ringan dan berat menjadi kondisi baik dan sedang
116.870.706.940
Peningkatan Ruas Jalan Pandanan-Candirejo 2,4 KM
1.03.1.03.01.00.52.002. Pemeliharaan Rutin Jalan dan Jembatan
Inspeksi Kondisi Jalan DIY 1 dokumen 20.353.512.000 APBD 1. Terpeliharanya 78 ruas jalan propinsi
18.047.709.300
Inspeksi kondisi jembatan 1 dokumen 2. Terpeliharanya 241 buah jembatan
Terpeliharanya jalan propinsi 78 ruas (727,2 km) 3. Inspeksi kondisi jembatan
Terpeliharanya jembatan 241 buah 4. Inspeksi Kondisi Jalan
1.03.1.03.01.00.52.003. Pembangunan Jalan dan Jembatan
Pembangunan Jalan Akses Kawasan Industri Piyungan DIY 1 Km 47.780.000.000 APBD Tersedianya satu akses baru kawasan Wisata Prambanan dan Ratu Boko menuju Kawasan Gunung Api Purba Nglanggeran dan Kawasan Bentang Karst
91.026.000.000
Pengadaan lahan untuk pembangunan jalan Jangkaran - Pantai Congot 1.365 m2
1.03.1.03.01.00.52.005. Persertifikatan Tanah Jalan Provinsi
Pensertifikatan Tanah Jalan Provinsi
174.000.000
1.03.1.03.01.00.60 PROGRAM PENGELOLAAN DAN PENGEMBANGAN SARANA PRASARANA SANITASI
1. Penanganan sampah sistem regional 2. Penanganan Lokasi genangan 3. Layanan Sistem air limbah terpusat
DIY 1. 660 Ton/hari 2. 1 lokasi 3. 25.200 SR
25.545.000.000 APBD 1. 720 ton/hari 2. 1 lokasi 3. 26.300 SR
34.292.000.000
1.03.1.03.01.00.60.006 Pengembangan Sarana Prasarana Penanganan Sampah
2. Drainase DIY 965 meter 14.000.000.000 APBD Peningkatan sampah yang dikelola di TPST Regional menjadi sebesar 660 ton/hari
17.972.000.000
Pekerjaan tanggul penahan dinding lanjutan 2019, drainase dan jalan operasional di TPA Piyungan : 1. Tanggul penahan
450 meter
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
14
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Pemantauan dan Pengendalian Kualitas Air Masuk/Keluar IPAL DIY Kualitas Air dengan BOD Max 75 mg/ltr
2.750.000.000 APBD Mempertahankan layanan sistem air limbah terpusat sebesar 26.300 SR
2.000.000.0000
Pemantauan dan Pengendalian Kualitas Biota/Coliform Coliform Max 10.000 JPT/100ml
Pemantauan dan Pengendalian Kualitas Udara NH3 max 1,500 ppm dan H2S max 0,010 ppm
Pemantauan dan Pengendalian Unsur Dalam Sludge Baku mutu Timbal (Pb) < 10 mg/lt
Pemeliharaan Instalasi Pengolahan Air Limbah 68 unit
Pemeliharaan Jalan Kawasan IPAL 2 km
1.03.1.03.01.00.60.001 Pemeliharaan Jaringan Air Limbah Domestik Terpusat
Pemantauan dan Pengendalian Kualitas Air Limbah Jaringan DIY kualitas air Baku mutu Timbal (Pb) < 10 mg/lt
3.270.000.000 APBD Mempertahankan layanan sistem air limbah terpusat sebesar 26.300 SR
3.000.000.000
Pemantauan dan Pengendalian Kualitas Air Tanah di Jaringan kualitas air tanah dengan kadar Coliform Max 50 JPT/100 ml
Pemeliharaan jaringan air Limbah 234 km
1.03.1.03.01.00.60.002 Pemeliharaan Instalasi Pengolahan Lumpur Tinja
Operasional dan Pemeliharaan APLT (kap. 100M3/hari) DIY 1 unit 2.500.000.000 APBD Mempertahankan layanan pengolahan air limbah terpusat dan lumpur tinja (IPLT) sebesar 100 m3/hari
1.320.000.000
Pemantauan dan Pengendalian Kualitas Lumpur Tinja dari Truck tangki PH berkisar 6-9
Pemeliharaan Instalasi Pengolah Lumpur Tinja 1 Unit
Pengendalian Kualitas Air Masuk/Keluar IPLT kualitas Air dari oulet IPLT dengan BOD Max75 mg/ltr
1.03.1.03.01.00.60.003 Pengembangan Sarana dan Prasarana Drainase
Pembangunan Saluran Drainase di Kawasan Desa Ngestiharjo, Kasihan, Bantul (lanjutan)
DIY 300 m 3.025.000.000 APBD Penanganan 1 Lokasi genangan
10.000.000.000
Penyusunan DED Kawasan JEC 1 dokumen
Penyusunan DED Saluran Drainase di Jalan Jogokaryan 1 dokumen, 550 meter
1.03.1.03.01.00.61 PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1. Pengelolaan Air Curah pada SPAM Regional 2. Panjang jaringan distribusi SPAM regional
DIY 1. 750 liter/detik 2. 91.174 m
14.459.114.000 APBD 1. 1.100 liter/detik 2. 92.374 m
74.061.600.000
Penyusunan AMDAL pengembangan SPAM Banyusoco DIY 1 dokumen 4.421.056.000 APBD 1.Penambahan penduduk berakses air minum 2. Penambahan Penduduk berakses Air Minum menuju Bandara NYIA, dan Kawasan industri Kulonprogo
10.061.600.000
Tersedianya bahan bangunan untuk pengembangan sistem penyediaan air minum pada kelompok SPAMDES
15 kelompok
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
15
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1.03.1.03.01.00.61.001 Pengelolaan Sistem Penyediaan Air Minum
1. Pengadaan pompa dozing (PAC & kaporit) 2. Pengadaan bahan kimia utk operasional
DIY 2 unit; 1 tahun
10.038.058.000 APBD Meningkatkan ketersediaan air curah dari 400 lt/dtk menjadi 700 Lt/Detik
64.000.000.000
1 Paket
2 unit
- 1 tahun; - 4 unit
1 tahun
1 paket
Operasional dan Pemeliharaan Alat kerja instalasi : - O & P Peralatan kerja
10 jenis
- 64 Km - 5 buah - 1 Paket
Pemeliharaan Unit Instalasi Clearweel : - Pemeliharaan rutin unit clearwell - Pengadaan pompa
1 tahun 2 unit
Pengadaan Alat Laboratorium Air Minum : - Pengadaan alat lab. Air & kalibrasi
4 jenis
43 orang
1.03.1.03.01.00.62 PROGRAM PENGELOLAAN DAN PENGEMBANGAN AIR BAKU
1. Penambahan kapasitas air baku 2. Air baku yang dipertahankan ketersediaannya
DIY 1. 19,50 liter/detik 2. 62,40 liter/detik
12.150.000.000 APBD 1. 19,50 liter/detik 2. 73,20 liter/detik
37.075.000.000
Pembangunan Embung Dlingseng Desa Banjaroya, Kec. Kalibawang, Kab. Kulonprogo
1 embung 6.150.000.000 APBD Penambahan penyediaan air baku sebesar 34,00 Liter/detik
24.075.000.000
Rekomendasi kebijakan sumber daya air melalui Dewan SDA 1 Dokumen Rekomendasi kebijakan sumber daya air
1.03.1.03.01.00.62.002 Pengelolaan Air Baku Operasi & Pemeliharaan Pos Hidrologi DIY 64 Pos Hidrologi 6.000.000.000 APBD Mempertahankan suply air baku di DIY sebesar 76,95 ltr/det
13.000.000.000
Pengelolaan Web dan Data SISDA 1 sistem/aplikasi
Penyusunan AKNOP Embung kewenangan Pemda DIY 1 dokumen AKNOP untuk 11 embung
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
16
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1.03.1.03.01.00.63 PROGRAM PENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI
1. Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
2. Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
DIY 1. 74,50 % 2. 77,82 %
19.891.600.000 APBD 1. 75,85 % 2. 82,41 %
48.000.000.000
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul DIY 1 dokumen 7.891.600.000 APBD Peningkatan Jaringan Irigasi sebesar 8.650 m
30.000.000.000
Updating PAI dan AKNPI 41 Daerah Irigasi 1 dokumen
1.03.1.03.01.00.63.002 Pengelolaan Jaringan Irigasi
Koordinasi Tata Pengaturan SDA DIY Masyarakat P3A/GP3A/IP3A di 41 D.I
12.000.000.000 APBD Dipertahankannya kinerja 41 DI sebesar 77,82%
18.000.000.000
Rekomendasi kebijakan pengelolaan irigasi di DIY melalui Komisi Irigasi 1 dokumen rekomendasi
1.03.1.03.01.00.56 PROGRAM PELAYANAN JASA PENGUJIAN DAN PEMBINAAN JASA KONSTRUKSI
1. Peningkatan kinerja tenaga konstruksi dan masyarakat jasa konstruksi
2. Sertifikat/ Laporan Hasil Uji yang diterbitkan
DIY
2.370.000.000 APBD
6.773.547.000
Inventarisasi data penyelenggaraan konstruksi DIY 1 laporan 1.000.000.000 APBD penambahan sejumlah 300 orang tenaga ahli konstruksi bersertifikat dan 3000 orang masyarakat terlayani informasi jasa konstruksi
2.516.220.000
Pengelolaan aplikasi sistem informasi jasa konstruksi 1 laporan
Penyebaran informasi dan pameran teknologi ke-PU-an melalui Klinik Konstruksi
1 laporan, 50 orang
Penyusunan informasi harga satuan bahan bangunan 12 laporan, 2750 orang
Tenaga ahli konstruksi bersertifikat 150 orang
Terselenggaranya peningkatan kualitas jasa konstruksi melalui pembinaan jasa konstruksi
80 orang
Laporan Hasil Uji
DIY 800 LHU
4.257.327.000
50.271.640.000 108.384.500.000
1.04.1.03.01.00.24 PROGRAM PENYELENGGARAAN PERUMAHAN
1. Penanganan Rumah Tidak Layak Huni 2. Perwujudan kawasan perumahan sesuai RTRW 3. Cakupan penanganan kawasan kumuh
DIY 1. 32,43 % 2. 12 % 3. 72,16 %
20.071.640.000 APBD 1. 43,10 % 2. 16 % 3. 86,08 %
72.384.500.000
Penanganan PSU Permukiman Kumuh Kecamatan Pengasih Kabupaten Kulonprogo
DIY 0,825 Ha
5.000.000.000
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
17
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Terlaksananya Penanganan Rumah Tidak Layak Huni Kab. Gunungkidul 515 unit 19.271.640.000 APBD Berkurangnya 4000 RTLH dan tersedianya data bagi pengurangan N+1
65.884.500.000
Terlaksananya Penanganan Rumah Tidak Layak Huni Kab. Kulonprogo 583 unit
1.04.1.03.01.00.24.003 Pengembangan Perumahan
Capaian Pendataan SPM Kawasan Rawan Bencana DIY DIY 1 dokumen pendataan SPM kawasan rawan bencana DIY
300.000.000 APBD pengembangan perumahan sesuai RTRW
1.500.000.000
Monitoring dan Evaluasi (monev) Perumahan dan Kawasan Permukiman DIY 1 laporan (monev dan pendataan basis data PKP)
Rekomendasi Kebijakan PKP 1 laporan kinerja Pokja PKP
1.04.1.03.01.00.25 PROGRAM PENYELENGGARAAN PRASARANA SARANA UTILITAS KAWASAN
1. Penyediaan PSU layak di kawasan permukiman 2. Penyediaan infrastruktur di kawasan strategis provinsi
DIY 1. 48 lokasi 2. 32 lokasi
30.200.000.000 APBD 1. 48 lokasi 2. 32 lokasi
36.000.000.000
Bantuan Prasarana, Sarana dan Utilitas Umum pada kawasan permukiman
DIY 16 titik
18.000.000.000
1.04.1.03.01.00.25.002 Penyelenggaraan Prasarana, Sarana, Dan Utilitas Umum (PSU) Kawasan Strategis
Penyediaan PSU di Kawasan Strategis Provinsi DIY 2 lokasi 27.000.000.000 APBD Peningkatan kualitas PSU pada 32 titik di Kawasan Strategis Propinsi
18.000.000.000
Struktur, Arsitektur dan Atap Bangunan VIP Room Bandara Baru YIA 1 unit gedung
2.05 ENERGI DAN SUMBER DAYA MINERAL
14.048.520.000 31.428.018.000
1. Penambahan jumlah rumah tangga yang menikmati listrik 2. Bangunan/gedung pemerintah, komersial dan industri yang telah
diaudit energi 3. Penambahan izin ketenagalistrikan sesuai ketentuan
DIY 1. 9848 RT 2. 72 Unit 3. 45 izin
7.069.920.000 APBD 1. 11.848 RT 2. 82 unit 3. 60 izin
16.346.088.000
2.05.1.03.01.00.31.002 Pengembangan dan Pemanfaatan Energi dan Ketenagalistrikan
Audit Energi DIY 10 Gedung 5.906.640.000 APBD Peningkatan jumlah rumah tangga miskin yang menikmati listrik sejumlah 2000 RT
5.060.000.000
2.05.1.03.01.00.31.003 Pengaturan dan Pembinaan Energi dan Ketenagalistrikan
Monitoring Pemanfaatan EBT di DIY DIY 1 laporan 450.000.000 APBD Peningkatan jumlah bangunan/gedung pemerintah, komersial dan industri yang melaksanakan konservasi energi sejumlah 10 bangunan
9.625.000.000
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
18
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Pembinaan Pelaksanaan Perijinan Ketenagalistrikan di 4 Kabupaten dan 1 Kota
50 unit usaha
25 unit usaha
Pengawasan dan Pengendalian kegiatan energi baru terbarukan DIY 2 laporan 713.280.000 APBD Penambahan 15 izin ketenagalistrikan yang sesuai ketentuan
1.661.088.000
Pengoperasian, Identifikasi dan Pendataan pembangkit listrik EBT di wilayah Bantul dan Kulon Progo
1 dokumen
1 dokumen
1 aplikasi
1 aplikasi
2.05.1.03.01.00.32 PROGRAM PENGELOLAAN AIR TANAH DAN GEOLOGI
1. Cakupan penyediaan air bersih di daerah sulit air 2. Rerata penurunan muka air tanah terhadap ketebalan akuifer 3. Penambahan jumlah izin air tanah yang sesuai dengan ketentuan
DIY 1. 76 dusun 2. < 20 % 3. 45 izin
4.600.600.000 APBD 1. 79 dusun 2. <20 % 3. 60 izin
12.018.930.000
2.05.1.03.01.00.32.003 Pendayagunaan Air Tanah dan Geologi
Terlaksananya Pembangunan Sumur Bor Air Tanah Dalam dan sumur resapan pada Daerah Sulit Air di Kabupaten Bantul
DIY 1 unit dan 20 unit 1.200.000.000 APBD Penyediaan air bersih 10 lt/detik dari sumber air tanah dalam di 10 lokasi
6.269.010.000
Terlaksananya Pembangunan Sumur Bor Air Tanah Dalam dan sumur resapan pada Daerah Sulit Air di Kabupaten Gunungkidul
1 unit dan 20 unit
2.05.1.03.01.00.32.001 Pengawasan Air Tanah dan Geologi
Pendataan dan Pencatatan volume air tanah untuk penghitungan NPA di wilayah Bantul dan Kulon progo
DIY 1 dokumen 1.300.600.000 APBD Penambahan 15 izin air tanah yang sesuai dengan ketentuan
1.663.750.000
Pendataan dan Pencatatan volume air tanah untuk penghitungan NPA di wilayah Sleman, Yogyakarta dan Gunungkidul
1 dokumen
Pendataan Pengguna Air Tanah Belum Berizin di Wilayah Bantul dan Kulon progo
1 dokumen
1 dokumen
Pengawasan dan Pengendalian pelaksanaan perizinan air tanah di wilayah DIY
2 laporan
Penyusunan E- Pelaporan Perizinan Air Tanah BP3ESDM Bantul dan Kulon progo
1 aplikasi
Penyusunan E- Pelaporan Perizinan Air Tanah BP3ESDM Sleman Yogyakarta dan Gunungkidul
1 aplikasi
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
19
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
2.05.1.03.01.00.32.002 Peningkatan Perlindungan Air Tanah dan Geologi
Monitoring dan Evaluasi Fluktuasi Air Tanah DIY 1 laporan 2.100.000.000 APBD Pengendalian pemanfaatan air tanah agar masih berada pada zona aman (<20%)
4.086.170.000
Pembinaan Pelaksanaan Pemanfaatan Air Tanah di 4 Kabupaten dan 1 Kota 2 laporan,80 unit usaha
Pembuatan sumur pantau air tanah dalam 4 unit
Perbaikan/Pemeliharaan AWLR dan sumur pantau air tanah dalam 4 unit
Rekomtek Izin Pemanfaatan Air Tanah di 4 Kabupaten dan 1 Kota 1 laporan, 120 unit usaha
2.05.1.03.01.00.33 PROGRAM PENGELOLAAN PERTAMBANGAN
DIY 1. 7,6 % 2. 26 izin
2.378.000.000 APBD 1. 7,7 % 2. 33 izin
3.063.000.000
Pembinaan Pelaksanaan Usaha Pertambangan DIY 60 unit usaha 1.394.000.000 APBD Pengusahaan Kawasan Peruntukan Pertambangan sebesar 7,7%
1.863.000.000
Penyusunan Dokumen Lingkungan untuk kegiatan Pertambangan Rakyat di 3 Kabupaten ( pasir dan batu di sleman, bantul, Kulonprogo : emas di kokap, andesi dll di Guungkidul)
3 dokumen
Rencana Detail Blue Print Pengembangan dan Pemberdayaan Masyarakat sekitar WIUP
1 dokumen rencana Pengembangan dan Pemberdayaan Masyarakat sekitar WIUP
2.05.1.03.01.00.33.001 Pengawasan dan Pengendalian Pengusahaan Pertambangan
Identifikasi Penambangan Tanpa Ijin (PETI) wilayah Bantul & Kulon Progo DIY 1 dokumen berisi hasil identifikasi PETI
984.000.000 APBD Penambahan jumlah izin Pengusahaan Pertambangan yang sesuai dengan ketentuan sejumlah 7 izin
1.200.000.000
1 dokumen berisi hasil identifikasi PETI
Operasional Inspektur Tambang 1 dokumen pengawasan dan pengendalian teknis Ijin usaha pertambangan
Pendataan dan Penghitungan Volume Produksi Usaha Pertambangan Wilayah Bantul & Kulon Progo
1 Dokumen
1 Dokumen
Penyusunan E- Pelaporan Perizinan Pertambangan Wilayah Bantul & Kulon Progo
1 Aplikasi
1 Aplikasi
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
20
Tabel 2.3. Program, Kegiatan Dan Paket Pekerjaan Melalui BLP 2020
(Status 30 Juni 2020)
Bina Marga 9 21 6 2 7 6
Cipta Karya 5 10 5 1 4 0
Perumahan 4 12 10 0 2 0
ESDM 5 16 14 0 0 2
Sekretariat 11 2 2 0 0 0
BP3 ESDM 3 0 0 0 0 0
Balai PJK 2 0 0 0 0 0
Balai PIALAMP 4 10 7 1 2 0
JUMLAH 49 89 54 6 17 12
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
21
Tabel 2.4. Evaluasi Renja Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral Daerah Istimewa Yogyakarta
No Sasaran Program/ Kegiatan
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
1 Meningkatnya Capaian Pelaksanaan Program Pendukung Sasaran Renstra SKPD
PROGRAM ADMINISTRASI PERKANTORAN
100% 11.398.9 10.000
100% 12.454.9 44.290
100% 13.268. 509.380
47.2 5.543.2 61.211
47,2 17.998. 205.501
100% 9.033.60 2.000
100% 7.364.32 1.907
100% 3.717.9 24.000
42.65 1.164.7 63.686
42,65 8.529.0 85.593
PROGRAM PENINGKATAN PENGEMBANGAN SISTEM PELAPORAN CAPAIAN KINERJA DAN PELAPORAN KEUANGAN
Persentase peningkatan pengembangan sistem laporan capaian kinerja dan keuangan
100% 967.770. 000
100% 971.540. 300
100% 850.434 .000
35.58 274.041 .500
35,58 1.245.5 81.800
2 Penduduk berakses sanitasi
Penanganan sampah sistem regional
780 ton/hari 25.099.2 00.000
607,65 ton/hari 2.847.90 7.300
660 ton/hari 14.000. 000.000
77,01 11,35 Bidang Cipta Karya
Penanganan Lokasi genangan
27.400 SR 9.099.20 0.000
25.018 SR 5.628.34 4.318
25.200 SR 7.090.2 03.536
25.107 SR 3.078.9 34.100
25.107 SR 8.707.2 78.418
91,63 95,69 Balai PIALAMP
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
22
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pengembangan Sarana dan Prasarana Drainase
Penanganan Lokasi genangan
14.423.0 00.000
Pembanguna n Saluran Drainase di Jalan Kaliurang, Simpang MM UGM, Sleman (lanjutan) (1 paket terselesaikan nya pembanguna n saluran drainase sepanjang 100 m Di jalan Kaliurang, Simpang MM UGM) : 1 lokasi dari 1 lokasi
4.666.73 6.900
Penyusunan DED Saluran Drainase Kawasan Jogja Expo Center (JEC) 1000 meter : 0 dokumen dari 1 dokumen
Pemeliharaa n Saluran Drainase di MM UGM dan di Desa Ngestiharjo, Kasihan, Bantul : 0 Lokasi dari 2 Lokasi
773.337 .000
Penyusunan DED Saluran Drainase Kawasan Jogja Expo Center (JEC) 1000 meter : 0 dokumen dari 1 dokumen
Pemeliharaa n Saluran Drainase di MM UGM dan di Desa Ngestiharjo, Kasihan, Bantul : 0 Lokasi dari 2 Lokasi
182.617 .800
Penyusunan DED Saluran Drainase Kawasan Jogja Expo Center (JEC) 1000 meter : 0 dokumen dari 1 dokumen
Pemeliharaan Saluran Drainase di MM UGM dan di Desa Ngestiharjo, Kasihan, Bantul : 0 Lokasi dari 2 Lokasi
4.849.3 54.700
Layanan Sistem air limbah terpusat
Mempertahank an layanan sistem air limbah terpusat sebesar 27.400 SR
2.835.70 0.000
Pemeliharaan Jaringan Air Limbah : Pipa Jaringan Air Limbah : 234 km dari 234 km
Pemantauan & Pengendalian Kualitas Air Tanah di Jaringan : Kualitas Air Tanah dengan Kadar Coliform Max : 1.8 JPT/100 ml dari 50 JPT/100 ml
2.503.69 2.939
Pemantauan & Pengendalia n Kualitas Air Limbah Jaringan : Baku mutu Timbal (Pb) : 0 mg/lt dari 10 mg/lt
Pemantauan & Pengendalia n Kualitas Air Tanah di Jaringan : kualitas air tanah dengan kadar Coliform Max : 0
2.685.1 75.056
Pemantaua n & Pengendalia n Kualitas Air Limbah Jaringan : Baku mutu Timbal (Pb) : 0.23 mg/lt dari 10 mg/lt
Pemantaua n & Pengendalia n Kualitas Air Tanah di Jaringan : kualitas air tanah dengan kadar Coliform Max : 50
726.314 .500
Pemantauan & Pengendalian Kualitas Air Limbah Jaringan : Baku mutu Timbal (Pb) : 0.23 mg/lt dari 10 mg/lt
Pemantauan & Pengendalian Kualitas Air Tanah di Jaringan : kualitas air tanah dengan kadar Coliform Max : 50 JPT/100 ml dari 50 JPT/100 ml
3.230.0 07.439
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
23
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pemantauan dan Pengendalian Kualitas Air Limbah Jaringan : Baku Mutu Timbal (Pb) : 0.28 mg/lt dari 10 mg/lt
Tenaga Operasional Jaringan Air Limbah : 14 Orang dari 14 Orang
JPT/100 ml dari 50 JPT/100 ml
Pemeliharaa n jaringan air Limbah : pipa jaringan air limbah : 0 km dari 234 km
JPT/100 ml dari 50 JPT/100 ml
Pemeliharaa n jaringan air Limbah : pipa jaringan air limbah : 0 km dari 234 km
Pemeliharaan jaringan air Limbah : pipa jaringan air limbah : 0 km dari 234 km
Pemeliharaan Instalasi Pengolahan Air Limbah Domestik Terpusat (Sharing Pemda DIY dan Pemkab/Kota)
Layanan Sistem air limbah terpusat
Dukungan kegiatan Pemeliharaan Instalasi Pengolahan Air Limbah Sistem Terpusat (Sharing Pemda DIY dan PemKab/Kota) pada Layanan Sistem Air Limbah Terpusat di KPY dari 26.300 SR Menjadi 27.400 SR
2.000.00 0.000
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0 ppm dari 1.5 ppm
Tenaga Operasional Instalasi Air Limbah : 11 Orang dari 11 Orang
Tim teknis pelaksanan dan Pengarah : 34 Orang dari 51 Orang
Pemeliharaan Jalan Kawasan IPAL : 2 km dari 2 km
2.228.22 6.262
Pemeliharaa n Instalasi Pengolahan Air Limbah : : 0 unit dari 68 unit
Pemantauan dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0 ppm dari 1.5 ppm
Pemeliharaa n Jalan Kawasan IPAL : 0 km dari 2 km
Pemantauan dan Pengendalia n Unsur Dalam Sludge :
2.750.0 00.000
Pemeliharaa n Instalasi Pengolahan Air Limbah : : 0 unit dari 68 unit
Pemantaua n dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0.02 ppm dari 1.5 ppm
Pemeliharaa n Jalan Kawasan IPAL : 0 km dari 2 km
Pemantaua n dan Pengendalia n Unsur Dalam Sludge :
1.229.7 19.200
Pemeliharaan Instalasi Pengolahan Air Limbah : : 0 unit dari 68 unit
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0.02 ppm dari 1.5 ppm
Pemeliharaan Jalan Kawasan IPAL : 0 km dari 2 km
Pemantauan dan Pengendalian Unsur Dalam Sludge : Unsur Dalam Sludge dengan kadar Timbal (Pb) :
3.457.9 45.462
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
24
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pemantauan dan Pengendalian Unsur Dalam Sludge : Unsur Dalam Sludge kadar Timbal (Pb) : 0.23 mg/lt dari 10 mg/lt
Pemantauan dan Pengendalian Kualitas Biota/Colifor m : Kualitas Biota dengan kondisi Coliform Max : 1.8 JPT/100ml dari 10000 JPT/100ml
Pemeliharaan Instalasi Pengolahan Air Limbah : 68 unit dari 68 unit
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi H2S : 0 ppm dari 0.01 ppm
Pemantauan dan Pengendalian Kualitas Air
Unsur Dalam Sludge dengan kadar Timbal (Pb) : 0 mg/lt dari 10 mg/lt
Pemantauan dan Pengendalia n Kualitas Biota/Colifor m : Kualitas Biota dengan kondisi Coliform Max : 0 JPT/100ml dari 10000 JPT/100ml
Belanja Modal Pengadaan Alat Laboratoriu m : 0 jenis dari 7 jenis
Belanja Modal Pengadaan Pompa Lumpur : 0 unit dari 1 unit
Pemantauan dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi H2S
Unsur Dalam Sludge dengan kadar Timbal (Pb) : 0.02 mg/lt dari 10 mg/lt
Pemantaua n dan Pengendalia n Kualitas Biota/Colifor m : Kualitas Biota dengan kondisi Coliform Max : 1.8 JPT/100ml dari 10000 JPT/100ml
Belanja Modal Pengadaan Alat Laboratoriu m : 7 jenis dari 7 jenis
Belanja Modal Pengadaan Pompa Lumpur : 1 unit dari 1 unit
Pemantaua n dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi H2S
0.02 mg/lt dari 10 mg/lt
Pemantauan dan Pengendalian Kualitas Biota/Coliform : Kualitas Biota dengan kondisi Coliform Max : 1.8 JPT/100ml dari 10000 JPT/100ml
Belanja Modal Pengadaan Alat Laboratorium : 7 jenis dari 7 jenis
Belanja Modal Pengadaan Pompa Lumpur : 1 unit dari 1 unit
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi H2S max : 0.01 ppm dari 10 ppm
Belanja Modal Pengadaan motor listrik pada kompresor vacum pump : 0 unit dari 1 unit
Pemantauan dan
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
25
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Masuk/Keluar IPAL : Ambang Batas BOD Max : 9.1 mg/ltr dari 75 mg/ltr
max : 0 ppm dari 10 ppm
Belanja Modal Pengadaan motor listrik pada kompresor vacum pump : 0 unit dari 1 unit
Pemantauan dan Pengendalia n Kualitas Air Masuk/Kelu ar IPAL : Kualitas Air dengan BOD Max : 0 mg/ltr dari 75 mg/ltr
max : 0.01 ppm dari 10 ppm
Belanja Modal Pengadaan motor listrik pada kompresor vacum pump : 0 unit dari 1 unit
Pemantaua n dan Pengendalia n Kualitas Air Masuk/Kelu ar IPAL : Kualitas Air dengan BOD Max : 5.1 mg/ltr dari 75mg/ltr
Pengendalian Kualitas Air Masuk/Keluar IPAL : Kualitas Air dengan BOD Max : 5.1 mg/ltr dari 75 mg/ltr
Pemeliharaan Instalasi Pengolahan Lumpur Tinja
Layanan Sistem air limbah terpusat
Mempertahank an layanan pengolahan air limbah terpusat dan lumpur tinja (IPLT) sebesar 100 m3/hari
1.452.00 0.000
Pemantauan dan Pengendalian Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6- 9 : 6.5 PH dari 9 PH
Pengendalian Kualitas Air Masuk/Keluar IPLT : Kualitas Air limbah dengan BOD Max : 61.2
896.425. 117
Pemeliharaa n Instalasi Pengolah Lumpur Tinja : 0 Instalasi dari 1 Instalasi
Pemeliharaa n APLT (kap. 100M3/hari) : Instalasi APLT : 0 unit dari 1 unit
Pemantauan dan Pengendalia n Kualitas
1.655.0 28.480
Pemeliharaa n Instalasi Pengolah Lumpur Tinja : 1 Instalasi dari 1 Instalasi
Pemeliharaa n APLT (kap. 100M3/hari) : Instalasi APLT : 1 unit dari 1 unit
Pemantaua n dan Pengendalia n Kualitas
1.122.9 00.400
Pemeliharaan Instalasi Pengolah Lumpur Tinja : 1 Instalasi dari 1 Instalasi
Pemeliharaan APLT (kap. 100M3/hari) : Instalasi APLT : 1 unit dari 1 unit
Pemantauan dan Pengendalian Kualitas Air Masuk/Keluar IPLT : Kualitas Air limbah
2.019.3 25.517
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
26
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
mg/ltr dari 75 mg/ltr
Pemeliharaan Instalasi Pengolah Lumpur Tinja : 1 unit dari 1 unit
Air Masuk/Kelu ar IPLT : Kualitas Air limbah dengan BOD Max : 0 mg/lt dari 75 mg/lt
Pemantauan dan Pengendalia n Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6-9 : 0 PH dari 9 PH
Air Masuk/Kelu ar IPLT : Kualitas Air limbah dengan BOD Max : 4.6 mg/lt dari 75 mg/lt
Pemantaua n dan Pengendalia n Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6-9 : 6.8 PH dari 9 PH
dengan BOD Max : 4.6 mg/lt dari 75 mg/lt
Pemantauan dan Pengendalian Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6-9 : 6.8 PH dari 9 PH
Penyediaan Prasarana dan Sarana Sistem Pengelolaan Air Limbah Domestik Terpusat
Layanan Sistem air limbah terpusat
Dukungan Penambahan Layanan Jaringan Air Limbah Terpusat di KPY
2.811.50 0.000
Penyusunan Dokumen Perencanaan Pengembang an Jaringan Air Limbah Terpusat : 1 dokumen dari 1 dokumen
192.655. 500
N/A N/A N/A N/A Penyusunan Dokumen Perencanaan Pengembanga n Jaringan Air Limbah Terpusat : 1 dokumen dari 1 dokumen
192.655 .500
Bidang Cipta Karya
Rehabilitasi jaringan air limbah terpusat : Barek : 300 meter dari 300 meter
Rehabilitasi jaringan air limbah terpusat : Giwangan : 1.5 km dari 1.5 km
6.674.50 8.705
N/A N/A N/A N/A Rehabilitasi jaringan air limbah terpusat : Barek : 300 meter dari 300 meter
Rehabilitasi jaringan air limbah terpusat : Giwangan : 1.5 km dari 1.5 km
6.674.5 08.705
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
27
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pengembangan Sarana Prasarana Penanganan Sampah
Penanganan sampah sistem regional
Peningkatan sampah yang dikelola di TPST Regional menjadi sebesar 780 ton/hari
25.099.2 00.000
Pembanguna n tanggul penahan dinding TPST Piyungan : 40 meter dari 40 meter
Perencanaan DED tanggul penahan dinding lanjutan, drainase, dan jalan operasional di TPA Piyungan : 1 Dokumen dari 1 Dokumen
2.847.90 7.300
Pekerjaan tanggul penahan dinding lanjutan 2019, drainase, saluran lindi dan jalan di TPA Piyungan : 0 Meter dari 450 Meter
14.000. 000.000
Pekerjaan tanggul penahan dinding lanjutan 2019, drainase, saluran lindi dan jalan di TPA Piyungan : 0 Meter dari 450 Meter
0 Pekerjaan tanggul penahan dinding lanjutan 2019, drainase, saluran lindi dan jalan di TPA Piyungan : 0 Meter dari 450 Meter
0
0
PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Pengelolaan Air Curah pada SPAM Regional
1.150 liter/ detik
24,35 4,43 Balai PIALAMP
110.074 meter 64.000.0 00.000
91.447 meter 3.406.93 1.000
91.174 meter 4.108.9 28.000
91.447 meter 153.186 .660
91.447 meter 153.186 .660
Pengelolaan Air Curah pada SPAM Regional
Meningkatkan ketersediaan air curah dari 700 lt/dtk menjadi 1000 Lt/Detik
65.000.0 00.000
Belanja Jasa Konsultasi Perencanaan Dokumen Business Plan : 1 Dokumen dari 1 Dokumen
Operasi dan Pemeliharaan Prasedimenta si, Reservoir
6.734.78 1.905
Pemeliharaa n Alat-alat Laboratoriu m : 0 jenis dari 20 jenis
6.618.4 55.000
Pemeliharaa n Alat-alat Laboratoriu m : 20 jenis dari 20 jenis
2.882.6 11.450
Pemeliharaan Alat-alat Laboratorium : 20 jenis dari 20 jenis
Pemeliharaan Intake dan
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
28
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
dan Boster : 7 unit dari 7 unit
Operasi dan Pemeliharaan IPA : 2 unit dari 2 unit
Operasional SPAM Regional : Tenaga Operasional SPAM : 25 Orang dari 28 Orang
Operasi dan Pemeliharaan Jaringan PIPA : 40 km dari 40 km
Operasi dan Pemeliharaan Clearwell : 1 unit dari 1 unit
Operasi dan Pemeliharaan Intake dan Kantor : 2 unit dari 2 unit
Belanja Jasa Tenaga Ahli : 2 Orang dari 2 Orang
Pemeliharaa n Intake dan Kantor : 0 unit dari 2 unit
Pemeliharaa n Prasediment asi : 0 unit dari 1 unit
Pemeliharaa n Reservoir dan Boster : 0 unit dari 10 unit
Pemeliharaa n Jaringan PIPA : 0 km dari 63 km
Pemeliharaa n Intake dan Kantor : 1 unit dari 2 unit
Pemeliharaa n Prasediment asi : 1 unit dari 1 unit
Pemeliharaa n Reservoir dan Boster : 0 unit dari 10 unit
Pemeliharaa n Jaringan PIPA : 30.66 km dari 63 km
Kantor : 1 unit dari 2 unit
Pemeliharaan Prasedimentas i : 1 unit dari 1 unit
Pemeliharaan Reservoir dan Boster : 0 unit dari 10 unit
Pemeliharaan Jaringan PIPA : 30.66 km dari 63 km
Pengembangan Sistem Penyediaan Air Minum
Panjang jaringan distribusi SPAM regional
1.Penambahan penduduk berakses air minum
64.000.0 00.000
Tersedianya bahan bangunan untuk pengembang an sistem penyediaan air minum pada
3.406.93 1.000
Penyusunan Masterplan dan DED pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
4.108.9 28.000
Penyusunan Masterplan dan DED pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
153.186 .660
Penyusunan Masterplan dan DED pengembanga n SPAM Banyusoco : 0 dokumen dari 1 dokumen
3.560.1 17.660
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
29
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
kelompok SPAMDES : 26 kelompok dari 26 kelompok
Jasa konsultansi Sistem Pengelolaan Jaringan Air Bersih SPAM Regional Kartamantul Berbasis GIS dan Geotagging : 1 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dan Inverter : 0 unit dari 2 unit
Tersedianya Belanja Modal Alat Laboratoriu m Kimia : 0 unit dari 4 unit
Tersedianya Belanja Modal Locator Detektor Pipa : 0 unit dari 1 unit
Tersedianya bahan bangunan untuk pengemban gan sistem penyediaan air minum pada kelompok SPAMDES : 0 Kelompok dari 25 Kelompok
Apraisal tanah untuk PDAB : 0 dokumen dari 1 dokumen
Tersedianya Belanja
Tersedianya Belanja Modal Pengadaan Pompa dan Inverter : 0 unit dari 2 unit
Tersedianya Belanja Modal Alat Laboratoriu m Kimia : 0 unit dari 4 unit
Tersedianya Belanja Modal Locator Detektor Pipa : 0 unit dari 1 unit
Tersedianya bahan bangunan untuk pengemban gan sistem penyediaan air minum pada kelompok SPAMDES : 0 Kelompok dari 25 Kelompok
Apraisal tanah untuk PDAB : 0 dokumen dari 1 dokumen
Tersedianya Belanja
Tersedianya Belanja Modal Pengadaan Pompa dan Inverter : 0 unit dari 2 unit
Tersedianya Belanja Modal Alat Laboratorium Kimia : 0 unit dari 4 unit
Tersedianya Belanja Modal Locator Detektor Pipa : 0 unit dari 1 unit
Tersedianya bahan bangunan untuk pengembanga n sistem penyediaan air minum pada kelompok SPAMDES : 0 Kelompok dari 25 Kelompok
Apraisal tanah untuk PDAB : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Bangunan Bak Injeksi Kaporit : 0 unit dari 1 unit
Penyusunan FS
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
30
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Modal Pengadaan Bangunan Bak Injeksi Kaporit : 0 unit dari 1 unit
Penyusunan FS pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dozing : 0 unit dari 2 unit
Pembangun an Jalan akses Reservoir Guwo : 0 Meter dari 90 Meter
Tersedianya Belanja Modal Pengadaan Alat Ukur (Watermeter Digital) : 0 unit dari 3 unit
Modal Pengadaan Bangunan Bak Injeksi Kaporit : 0 unit dari 1 unit
Penyusunan FS pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dozing : 0 unit dari 2 unit
Pembangun an Jalan akses Reservoir Guwo : 0 Meter dari 90 Meter
Tersedianya Belanja Modal Pengadaan Alat Ukur (Watermeter Digital) : 0 unit dari 3 unit
pengembanga n SPAM Banyusoco : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dozing : 0 unit dari 2 unit
Pembangunan Jalan akses Reservoir Guwo : 0 Meter dari 90 Meter
Tersedianya Belanja Modal Pengadaan Alat Ukur (Watermeter Digital) : 0 unit dari 3 unit
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
31
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
4 Meningkatnya luas fungsional daerah irigasi yang terlayani air irigasi
PROGRAM PENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI
Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
77,20% 34.219.4 06.250
72,31% 3.283.81 8.500
74,50% 363.470 .000
72,31% 71.730. 000
72,31% 71.730. 000
Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
87,00% 39.616.4 06.000
73,48% 11.889.6 99.728
77,82% 10.527. 545.500
73,48% 2.524.5 98.969
73,48% 2.524.5 98.969
Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
Peningkatan Jaringan Irigasi sebesar 52.250 m
76.719.3 98.150
Detail Engineering Design D.I. Blawong : 1 dokumen dari 1 dokumen
Detail Engineering Design D.I. Sapon : 1 dokumen dari 1 dokumen
Peningkatan Jaringan Irigasi D.I. Kucir : 350 meter dari 350 meter
Peningkatan Jaringan Irigasi D.I. Kuton : 350 meter dari 350 meter
Detail Engineering Design D.I. Pijenan/Kamij
3.283.81 8.500
Updating Pengeloaan Aset Irigasi (PAI) dan AKNPI 41 Daerah Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul : 0 dokumen dari 1 dokumen
363.470 .000
Updating Pengeloaan Aset Irigasi (PAI) dan AKNPI 41 Daerah Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul : 0 dokumen dari 1 dokumen
71.730. 000
Updating Pengeloaan Aset Irigasi (PAI) dan AKNPI 41 Daerah Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul : 0 dokumen dari 1 dokumen
3.355.5 48.500
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
32
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
oro : 1 dokumen dari 1 dokumen
Peningkatan Jaringan Irigasi D.I. Ponggok : 400 meter dari 400 meter
Penilaian Kondisi Fisik Jaringan Irigasi : 1 dokumen dari 1 dokumen
Detail Engineering Design D.I. Pendowo : 1 dokumen dari 1 dokumen
Pengelolaan Jaringan Irigasi
Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
Dipertahankan nya kinerja 41 DI sebesar 82,41%
39.616.4 06.000
Operasional Komisi Irigasi DIY & Operasional Sekretariat : 1 kegiatan dari 1 kegiatan
Koordinasi Tata Pengaturan SDA (Masyarakat
11.889.6 99.728
Koordinasi Tata Pengaturan SDA (Masyarakat P3A/GP3A/I P3A) : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengamana n & Pengendalia n Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Berkala
10.527. 545.50 0
Koordinasi Tata Pengaturan SDA (Masyarakat P3A/GP3A/I P3A) : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengamana n & Pengendalia n Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Berkala
2.524.5 98.969
Koordinasi Tata Pengaturan SDA (Masyarakat P3A/GP3A/IP3 A) : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengamanan & Pengendalian Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaan Berkala Jaringan Irigasi : 0 Daerah Irigasi
14.414. 298.697
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
33
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
P3A/GP3A/IP 3A : 41 DI dari 41 DI
Pengamanan & Pengendalian Jaringan Irigasi : 41 DI dari 41 DI
Pemeliharaan Berkala Sempadan & Jalan Inspeksi Jaringan Irigasi : 6 DI dari 6 DI
Pemeliharaan Rutin Jaringan Irigasi : 41 DI dari 41 DI
Operasi Jaringan Irigasi : 41 DI dari 41 DI
Jaringan Irigasi : 0 Daerah Irigasi dari 8 Daerah Irigasi
Operasi Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Rutin Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Rekomenda si kebijakan pengelolaan irigasi di DIY melalui Komisi Irigasi : 0 dokumen dari 1 dokumen
Jaringan Irigasi : 0 Daerah Irigasi dari 8 Daerah Irigasi
Operasi Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Rutin Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Rekomenda si kebijakan pengelolaan irigasi di DIY melalui Komisi Irigasi : 0 dokumen dari 1 dokumen
dari 8 Daerah Irigasi
Operasi Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaan Rutin Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengembangan Jaringan Irigasi (D A K)
N/A N/A Rehabilitasi Jaringan Irigasi D.I. Simo : 700 meter dari 700 meter
Rehabilitasi Jaringan Irigasi D.I. Blawong : 350 meter dari 350 meter
4.168.42 7.800
Rehabilitasi Jaringan Irigasi D.I. Pijenan/Kam ijoro Saluan Pembawa : 0 Meter dari 350 Meter
Tersusunny a Rencana Kerja 2021, Rapat Koordinasi
5.764.8 80.000
Rehabilitasi Jaringan Irigasi D.I. Pijenan/Ka mijoro Saluan Pembawa : 0 Meter dari 350 Meter
Tersusunny a Rencana Kerja 2021, Rapat
0 Rehabilitasi Jaringan Irigasi D.I. Pijenan/Kamijo ro Saluan Pembawa : 0 Meter dari 350 Meter
Tersusunnya Rencana Kerja 2021, Rapat Koordinasi Persiapan
4.168.4 27.800
Bidang SDAD
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
34
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Dokumen Laporan E- monitoring Triwulan : 4 dokumen dari 4 dokumen
Perencanaan DED DAK 2020 : 1 dokumen dari 1 dokumen
Persiapan Rencana Kerja : 0 dokumen dari 1 dokumen
Koordinasi Persiapan Rencana Kerja : 0 dokumen dari 1 dokumen
Rencana Kerja : 0 dokumen dari 1 dokumen
PROGRAM PENGELOLAAN DAN PENGEMBANGAN AIR BAKU
Penyediaan Air Baku
403,86 liter/ detik
0 liter/detik 81.559. 000
0 liter/detik 7.978.3 98.954
0,00 27,73 Bidang SDAD
54,31 liter/ detik
64,65 37,79 Bidang SDAD
Penyediaan Air Baku
28.773.8 00.000
Pembanguna n Embung Sendangtirto Berbah Sleman : 0 paket dari 1 paket
Penyusunan DED Long Storage Hargomulyo, Gedangsari, Gunungkidul : 1 dokumen dari 1 dokumen
Penyusunan FS Embung Bakulan Trirenggo Bantul : 1 dokumen dari 1 dokumen
Operasional Sekretriat
7.896.83 9.954
Rekomendasi kebijakan sumber daya air melalui Dewan SDA : 0 dokumen dari 1 dokumen
303.924 .000
Rekomenda si kebijakan sumber daya air melalui Dewan SDA : 0 dokumen dari 1 dokumen
81.559. 000
Rekomendasi kebijakan sumber daya air melalui Dewan SDA : 0 dokumen dari 1 dokumen
7.978.3 98.954
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
35
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Dewan Sumber Daya Air DIY : 1 dokumen dari 1 dokumen
Penyusunan DED Broncupturin g Panggang, Panggang, Gunungkidul : 1 dokumen dari 1 dokumen
Penyusunan FS Embung Triwidadi Pajangan Bantul : 1 dokumen dari 1 dokumen
Penilaian kelayakan potensi sumber air baku : 1 dokumen dari 1 dokumen
Penyusunan FS Embung Minggir, Sleman : 1 dokumen dari 1 dokumen
Penyusunan DED Embung Ngreco, Pundong, Bantul : 1 dokumen dari 1 dokumen
Pembanguna n Embung Jeruk Wudel,
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
36
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Girisubo, Gunungkidul : 1 paket dari 1 paket
Pelaksanaan sistem manajemen mutu : 1 kegiatan dari 1 kegiatan
Pengelolaan Air Baku
Pengelolaan Air Baku
Mempertahank an suply air baku di DIY sebesar 76,95 ltr/det
29.359.8 00.000
Pemeliharaan Berkala Embung/Tela ga : 7 embung dari 7 embung
Operasi & Pemeliharaan Pos Hidrologi : 69 pos hidrologi dari 69 pos hidrologi
Pelaksanaan SIH3 : 1 kegiatan dari 1 kegiatan
Pengelolaan Data SDA : 1 sistem dari 1 sistem
Kampanye Pengelolaan SDA : 6 kegiatan dari 6 kegiatan
Pengadaan Pos AWLR : 1 paket dari 1
9.900.90 1.779
Pemeliharaa n Rutin Embung/Tel aga : 0 Embung dari 24 Embung
Pengelolaan Web dan Data SISDA : 0 Sistem / Aplikasi dari 1 Sistem / Aplikasi
Kampanye Pengelolaan SDA : 0 Kegiatan dari 3 Kegiatan
Operasi & Pemeliharaa n Pos Hidrologi : 0 Pos Hidrologi dari 64 Pos Hidrologi
2.794.9 22.400
Pemeliharaa n Rutin Embung/Tel aga : 0 Embung dari 24 Embung
Pengelolaan Web dan Data SISDA : 0 Sistem / Aplikasi dari 1 Sistem / Aplikasi
Kampanye Pengelolaan SDA : 0 Kegiatan dari 3 Kegiatan
Operasi & Pemeliharaa n Pos Hidrologi : 0 Pos Hidrologi dari 64 Pos Hidrologi
1.193.3 35.187
Pemeliharaan Rutin Embung/Telag a : 0 Embung dari 24 Embung
Pengelolaan Web dan Data SISDA : 0 Sistem / Aplikasi dari 1 Sistem / Aplikasi
Kampanye Pengelolaan SDA : 0 Kegiatan dari 3 Kegiatan
Operasi & Pemeliharaan Pos Hidrologi : 0 Pos Hidrologi dari 64 Pos Hidrologi
11.094. 236.966
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
37
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
paket
Pemeliharaan Rutin Embung/Tela ga : 24 embung dari 24 embung
Pengecatan Pos Hidrologi : 29 pos hidrologi dari 30 pos hidrologi
Pengadaan Lampu Penerangan Embung/Sola r sell : 7 unit dari 7 unit
Pengadaan Alat Hidrologi : 4 jenis dari 4 jenis
5 Meningkatnya aksesibilitas wilayah
PROGRAM PENYELENGGA RAAN JALAN
75,26% 167.293. 565.320
73,48% 87.093.2 55.370
74,06% 32.280. 490.000
73,48% 8.748.2 57.286
73,48% 95.841. 512.656
Penambahan Jaringan Jalan Baru
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
38
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Peningkatan/Rehabi litasi Jalan dan Jembatan
Jaringan jalan provinsi dalam kondisi mantap
Peningkatan 17,20 Km jaringan jalan dari kondisi rusak ringan dan berat menjadi kondisi baik dan sedang
144.915. 110.860
Peningkatan Ruas Jalan Brosot-Toyan Sepanjang 2 Km : 100 % dari 100 %
Peningkatan Jembatan Denggung Sepanjang 18,5 Km : 100 % dari 100 %
Peningkatan Ruas Jalan Tegalsari - Klepu Sepanjang 3 Km : 100 % dari 100 %
Peningkatan Ruas Jalan Imogiri - Mangunan (Dodogan) Sepanjang 2,5 Km : 100 % dari 100 %
Peningkatan Jembatan Tambakrejo Sepanjang 6,00 m : 100 % dari 100 %
Peningkatan Ruas Jalan Besi - Jangkang -
70.829.7 99.050
Perencanaa n Peningkatan Jalan Patuk- Terong, Bantul : 0 Dokumen dari 1 Dokumen
Peningkatan Jalan Semin- Blimbing, Gunungkidul : 0 KM dari 2 KM
Perencanaa n Peningkatan Jalan Nglipar - Semin, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Hargomulyo -Watugajah, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Sambipitu- Nglipar- Semin, Gunungkidul : 0 Dokumen dari 1
12.894. 852.000
Perencanaa n Peningkatan Jalan Patuk- Terong, Bantul : 1 Dokumen dari 1 Dokumen
Peningkatan Jalan Semin- Blimbing, Gunungkidul : 0 KM dari 2 KM
Perencanaa n Peningkatan Jalan Nglipar - Semin, Gunungkidul : 1 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Hargomulyo -Watugajah, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Sambipitu- Nglipar- Semin, Gunungkidul
121.655 .900
Perencanaan Peningkatan Jalan Patuk- Terong, Bantul : 1 Dokumen dari 1 Dokumen
Peningkatan Jalan Semin- Blimbing, Gunungkidul : 0 KM dari 2 KM
Perencanaan Peningkatan Jalan Nglipar - Semin, Gunungkidul : 1 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Hargomulyo- Watugajah, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Sambipitu- Nglipar-Semin, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Jembatan Gedangan, Gunungkidul : 0 Dokumen
70.951. 454.950
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
39
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Koroulon Sepanjang 2,50 Km : 100 % dari 100 %
Peningkatan Ruas Jalan Sampakan - Singosaren Sepanjang 2 Km : 100 % dari 100 %
Dokumen
: 0 Dokumen dari 1 Dokumen
DED Jembatan Gedangan, Gunungkidul : 0 Dokumen dari 1 Dokumen
dari 1 Dokumen
Jaringan jalan provinsi dalam kondisi mantap
760,45 km 5.740,96 m 1 dokumen 1 dokumen
22.378.4 54.460
Pemeliharaan Rutin Jembatan : 100 % dari 100 %
Pemeliharaan Rutin Jalan : 100 % dari 100 %
16.263.4 56.320
Tersedianya Dokumen Inspeksi Kondisi Jalan : 0 dokumen dari 1 dokumen
Tersedianya Dokumen Inspeksi Kondisi Jembatan : 0 dokumen dari 1 dokumen
Terpeliharan ya Jembatan Provinsi (246 buah jembatan) : 0 M dari 5727.8 M
Terpeliharan ya Jalan Provinsi (92 ruas jalan) : 0 Km dari 731.7 Km
19.385. 638.000
Tersedianya Dokumen Inspeksi Kondisi Jalan : 0 dokumen dari 1 dokumen
Tersedianya Dokumen Inspeksi Kondisi Jembatan : 0 dokumen dari 1 dokumen
Terpeliharan ya Jembatan Provinsi (246 buah jembatan) : 3264 M dari 5727.8 M
Terpeliharan ya Jalan Provinsi (92 ruas jalan) : 417 Km dari 731.7 Km
8.626.6 01.386
Tersedianya Dokumen Inspeksi Kondisi Jalan : 0 dokumen dari 1 dokumen
Tersedianya Dokumen Inspeksi Kondisi Jembatan : 0 dokumen dari 1 dokumen
Terpeliharanya Jembatan Provinsi (246 buah jembatan) : 3264 M dari 5727.8 M
Terpeliharanya Jalan Provinsi (92 ruas jalan) : 417 Km dari 731.7 Km
24.890. 057.706
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
40
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pembangunan Jalan dan Jembatan
Penambahan Jaringan Jalan Baru
Tersedianya satu akses baru kawasan Wisata Prambanan dan Ratu Boko menuju Kawasan Gunung Api Purba Nglanggeran dan Kawasan Bentang Karst
91.032.0 00.000
Studi Pengembang an Jaringan Jalan di DIY : 1 dokumen dari 1 dokumen
Pembanguna n Jembatan Tlacap sepanjang 14 m : 100 % dari 100 %
Kajian Pembanguna n Jembatan Kebosungu : 1 dokumen dari 1 dokumen
Kajian Pembanguna n Jalan Gejawan- Balecatur : 1 dokumen dari 1 dokumen
4.821.72 5.800
N/A
N/A
N/A
N/A
Studi Pengembanga n Jaringan Jalan di DIY : 1 dokumen dari 1 dokumen
Pembangunan Jembatan Tlacap sepanjang 14 m : 100 % dari 100 %
Kajian Pembangunan Jembatan Kebosungu : 1 dokumen dari 1 dokumen
Kajian Pembangunan Jalan Gejawan- Balecatur : 1 dokumen dari 1 dokumen
4.821.7 25.800
Bidang Bina Marga
Peningkatan Jalan (DAK)
N/A N/A Peningkatan Ruas Jalan Klangon - Tempel (DAK) sepanjang 3,5 Km : 100 % dari 100 %
Pelaporan e- monitoring Peningkatan Jalan (DAK) : 2 dokumen dari 2 dokumen
Peningkatan
32.602.4 01.800
Tersusunny a Rencana Kerja 2021, Rapat Koordinasi Persiapan Rencana Kerja : 0 Dokumen dari 1 Dokumen
Peningkatan Ruas Jalan Brosot- Toyan (DAK) : 0
0 Tersusunny a Rencana Kerja 2021, Rapat Koordinasi Persiapan Rencana Kerja : 0 Dokumen dari 1 Dokumen
Peningkatan Ruas Jalan Brosot- Toyan (DAK) : 0
0 N/A N/A Bidang Bina Marga
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
41
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Ruas Jalan Brosot-Toyan (DAK) Sepanjang 3 Km : 100 % dari 100 %
KM dari 3 KM
Peningkatan Ruas Jalan Denggung- Wonorejo (DAK) : 0 KM dari 2.5 KM
Tersedianya Data Survei Kondisi Jalan Tahun 2020 : 0 Dokumen dari 1 Dokumen
Tersedianya Data Survei Kondisi Jembatan Tahun 2020 : 0 Dokumen dari 1 Dokumen
KM dari 3 KM
Peningkatan Ruas Jalan Denggung- Wonorejo (DAK) : 0 KM dari 2.5 KM
Tersedianya Data Survei Kondisi Jalan Tahun 2020 : 0 Dokumen dari 1 Dokumen
Tersedianya Data Survei Kondisi Jembatan Tahun 2020 : 0 Dokumen dari 1 Dokumen
Pensertifikatan Tanah Jalan Provinsi
Penambahan Jaringan Jalan Baru
Tersedianya data informasi dan perkembangan Jalan Provinsi sebanyak 1 Ruas
168.000. 000
924.468. 680
486.700 .000
175.124 .520
1.099.5 93.200
PROGRAM PELAYANAN JASA PENGUJIAN DAN PEMBINAAN JASA KONSTRUKSI
Peningkatan kinerja tenaga konstruksi dan masyarakat jasa konstruksi
99,14% 2.371.84 2.000
64,12% 1.207.18 6.400
75,13% 428.535 .500
67,78% 126.518 .000
67,78% 1.333.7 04.400
800 LHU 4.683.05 9.900
1286 LHU 1.075.37 0.697
800 LHU 611.526 .900
167 LHU 114.321 .340
167 LHU 1.189.6 92.037
20,875 25,40 Balai PJK
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
42
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pembinaan Tenaga Kerja Konstruksi dan Layanan Informasi Jasa Konstruksi
Peningkatan kinerja tenaga konstruksi dan masyarakat jasa konstruksi
penambahan sejumlah 300 orang tenaga ahli konstruksi bersertifikat dan 3000 orang masyarakat terlayani informasi jasa konstruksi
2.371.842.0 00
Penyebaran informasi dan pameran teknologi ke- PU-an melalui Klinik Konstruksi : 1 Laporan dari 1 Laporan
Inventarisasi data penyelenggar aan konstruksi : 1 Laporan dari 1 Laporan
Peningkatan kualitas jasa konstruksi melalui pembinaan jasa konstruksi : 190 Orang dari 190 Orang
Penyusunan informasi harga satuan bahan bangunan : 12 Laporan dari 12 Laporan
Pengelolaan aplikasi sistem informasi jasa konstruksi : 1 Laporan dari 1 Laporan
Fasilitasi sertifikasi Tenaga Ahli
1.207.18 6.400
Pengelolaan Aplikasi Sistem Informasi Jasa Konstruksi : 0 Laporan dari 1 Laporan
Penyebaran Informasi dan Pameran Teknologi ke-PU-an : 0 Laporan dari 1 Laporan
Inventarisasi Data Penyelengg araan Konstruksi : 0 Laporan dari 1 Laporan
Pendamping an Masyarakat Melalui Klinik Konstruksi : 0 Orang dari 40 Orang
Fasilitasi Sertifikasi Tenaga Ahli Konstruksi : 0 Orang dari 30 Orang
Pembinaan Jasa Konstruksi : 0 Orang dari 40 Orang
428.535 .500
Pengelolaan Aplikasi Sistem Informasi Jasa Konstruksi : 0 Laporan dari 1 Laporan
Penyebaran Informasi dan Pameran Teknologi ke-PU-an : 0 Laporan dari 1 Laporan
Inventarisasi Data Penyelengg araan Konstruksi : 0 Laporan dari 1 Laporan
Pendamping an Masyarakat Melalui Klinik Konstruksi : 40 Orang dari 40 Orang
Fasilitasi Sertifikasi Tenaga Ahli Konstruksi : 30 Orang dari 30 Orang
Pembinaan Jasa Konstruksi :
126.518 .000
Pengelolaan Aplikasi Sistem Informasi Jasa Konstruksi : 0 Laporan dari 1 Laporan
Penyebaran Informasi dan Pameran Teknologi ke- PU-an : 0 Laporan dari 1 Laporan
Inventarisasi Data Penyelenggara an Konstruksi : 0 Laporan dari 1 Laporan
Pendampingan Masyarakat Melalui Klinik Konstruksi : 40 Orang dari 40 Orang
Fasilitasi Sertifikasi Tenaga Ahli Konstruksi : 30 Orang dari 30 Orang
Pembinaan Jasa Konstruksi : 40 Orang dari 40 Orang
Penyusunan Informasi Teknis Bahan Bangunan : 6 Laporan dari 12 Laporan
1.333.7 04.400
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
43
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
konstruksi : 300 Orang dari 300 Orang
Pendampinga n masyarakat melalui Klinik Konstruksi : 120 Orang dari 120 Orang
Penyusunan Informasi Teknis Bahan Bangunan : 0 Laporan dari 12 Laporan
40 Orang dari 40 Orang
Penyusunan Informasi Teknis Bahan Bangunan : 6 Laporan dari 12 Laporan
Pelayanan Jasa Pengujian Kontruksi
Jumlah sertifikat/ Laporan Hasil Uji yang diterbitkan sebanyak 800 LHU
4.683.059.9 00
Pengujian Kualitas Pengujian Tanah Batuan dan Bahan Bangunan : 1286 LHU dari 800 LHU
1.075.37 0.697
Pemeliharaa n Alat : 0 jenis dari 20 jenis
Pengujian Kualitas Mutu Tanah, Batuan, dan Kualitas Bahan Bangunan : 0 LHU dari 800 LHU
Pengadaan AlatLaborato rium Fisika : 0 jenis dari 20 jenis
Pengadaan Peralatan/P erlengkapan : 0 jenis dari 98 jenis
Peningkatan Kualitas Laboratoriu m : 0 parameter dari 3 parameter
611.526 .900
Pemeliharaa n Alat : 0 jenis dari 20 jenis
Pengujian Kualitas Mutu Tanah, Batuan, dan Kualitas Bahan Bangunan : 167 LHU dari 800LHU
Pengadaan AlatLaborat orium Fisika : 0 jenis dari 20 jenis
Pengadaan Peralatan/P erlengkapan : 0 jenis dari 98 jenis
Peningkatan Kualitas Laboratoriu m : 0 parameter dari 3 parameter
114.321 .340
Kalibrasi Alat : 0 jenis dari 58 jenis
Pemeliharaan Alat : 0 jenis dari 20 jenis
Pengujian Kualitas Mutu Tanah, Batuan, dan Kualitas Bahan Bangunan : 167 LHU dari 800 LHU
Pengadaan Alat Laboratorium Fisika : 0 jenis dari 20 jenis
Pengadaan Peralatan/Perl engkapan : 0 jenis dari 98 jenis
Peningkatan Kualitas Laboratorium : 0 parameter dari 3 parameter
1.189.6 92.037
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
44
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
7 Penduduk dengan hunian yang layak
PROGRAM PENYELENGGARA AN PERUMAHAN
53,78% 65.884.5 00.000
38,86% 44.464.2 44.911
32,43% 8.319.9 40.380
38,86% 1.285.1 40.430
38,86% 45.749. 385.341
20% 15.000.0 00.000
8,91% 986.940. 500
12% 311.548 .000
8,91% 5.243.0 00
8,91% 992.183 .500
68,94% 82,497 Bidang Perumahan
Cakupan penanganan kawasan kumuh
10.000.0 00.000
Penanganan PSU Permukiman Kumuh Kec. Pengasih, Kab. Kulon Progo : 16 lokasi dari 16 lokasi
Penanganan PSU Permukiman Kumuh di Kel. Notoprajan Kec. Ngampilan, Kel. Ngampilan Kec. Ngampilan dan Kel. Prawirodirjan, Kec. Gondomana Kota Yogyakarta. : 13.51 hektar dari 13.51 hektar
8.249.65 5.459
- - - - Penanganan PSU Permukiman Kumuh Kec. Pengasih, Kab. Kulon Progo : 16 lokasi dari 16 lokasi
Penanganan PSU Permukiman Kumuh di Kel. Notoprajan Kec. Ngampilan, Kel. Ngampilan Kec. Ngampilan dan Kel. Prawirodirjan, Kec. Gondomana Kota Yogyakarta. : 13.51 hektar dari 13.51 hektar
8.249.6 55.459
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
45
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Penanganan Rumah Tidak Layak Huni
Penanganan Rumah Tidak Layak Huni
Berkurangnya 4000 RTLH dan tersedianya data bagi pengurangan N+1
65.884.5 00.000
Perencanaan Kebutuhan Rumah Tidak Layak Huni untuk Usulan BSPS, DAK, dan BKK (2.500 unit): a. Kabupaten Bantul (500 unit) b. Kabupaten Gunungkidul (1.000 unit) c. Kabupaten Sleman (250 unit) d. Kabupaten Kulon Progo (750 unit) : 2500 unit dari 2500 unit
Terlaksanany a Penanganan Rumah Tidak Layak Huni (4080 unit) : 1. Kabupaten Kulon Progo (850 unit) a. Kecamatan Kokap (350 unit) b
ii
DAFTAR ISI ........................................................................................................................................... ii
DAFTAR TABEL ................................................................................................................................... iii
DAFTAR GAMBAR ............................................................................................................................... iv
BAB 1 PENDAHULUAN ................................................................................................................... 1
1.1. Latar Belakang ................................................................................................................................. 1
1.2. Maksud, Tujuan dan Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum
Perumahan dan Energi Sumber Daya Mineral DIY ................................................................. 2
1.2.1. Maksud Perubahan Renja Dinas Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral Tahun 2020 ................................................................................. 2
1.2.2. Tujuan Perubahan Renja Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral DIY Tahun 2020 ......................................................................... 4
1.2.3. Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum
Perumahan dan Energi Sumber Daya Mineral DIY Tahun 2020 .............................. 4
BAB 2 EVALUASI RENJA ............................................................................................................... 5
BAB 3 RENCANA KERJA DAN PENDANAAN PERANGKAT DAERAH ...................................... 62
BAB 4 PENUTUP ........................................................................................................................... 85
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
iii
DAFTAR TABEL Tabel 2.1 Sasaran Renja Tahun 2020 Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral DIY ........................................................................................... 7
Tabel 2.2 Rumusan Rencana Program dan Kegiatan Dinas Pekerjaan Umum
Perumahan dan ESDM DIY Tahun 2020 dan Perkiraan Maju Tahun 2021 ................... 10
Tabel 2.3 Program, Kegiatan dan Paket Pekerjaan 2020 melalui BLP (status 30 Juni 2020) ...... 20
Tabel 2.4 Evaluasi Renja Dinas Pekerjaan Umum Perumahan dan ESDM DIY .......................... 21
Tabel 3.1 Perubahan Rencana Kerja 2020 Dinas Pekerjaan Umum Perumahan dan
Energi Sumber Daya Mineral DIY ................................................................................ 63
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
iv
DAFTAR GAMBAR Gambar 1.1 Hubungan Dokumen Rencana Pembangunan Daerah dengan Dokumen
Rencana Perangkat Daerah .................................................................................... 2
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
1
Pelaksanaan Urusan Pemerintahan bidang Pekerjaan Umum dan bidang Perumahan dan
Permukiman merupakan urusan wajib Pemerintah Daerah terkait Pelayanan Dasar yaitu melaksanakan
ketugasan penyediaan infrastruktur dasar (basic infrastructure) yang terdiri dari pelayanan di Sub Urusan
Sumber Daya Air, Sub Urusan Jalan, Sub Urusan Keciptakaryaan serta Sub Urusan Perumahan Rakyat
dan Kawasan Permukiman. Penyediaan infrastruktur dasar bagi seluruh lapisan masyarakat DIY tersebut
disenggarakan dalam rangka untuk peningkatan ekonomi lokal, pemberdayaan masyarakat, peningkatan
layanan masyarakat, dan kelestarian lingkungan. Sedangkan urusan pilihan pemerintah daerah yang
dikelola oleh DPUP-ESDM adalah Sub Urusan Energi dan Sumber Daya Mineral yang ditujukan untuk
membangun keamanan energi, keadilan energi, keberlanjutan lingkungan, serta peningkatan akses energi
masyarakat.
Rencana Kerja (Renja) Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral
(DPUP-ESDM) DIY adalah dokumen perencanaan untuk periode 1 (satu) tahun, yang memuat program,
kegiatan, lokasi, dan kelompok sasaran yang disertai indikator kinerja dan pendanaan sesuai dengan tugas
dan fungsi setiap Perangkat Daerah, yang disusun berpedoman kepada Renstra Perangkat Daerah dan
RKPD.
Pembangunan Nasional sebagaimana diatur dalam Undang-Undang Nomor 25 Tahun 2004, juga
memperhatikan Peraturan Menteri Dalam Negeri Nomor 86 Tahun 2017 tentang Tata Cara Perencanaan,
Pengendalian, dan Evaluasi Pembangunan Daerah, Tata Cara Evaluasi Rancangan Peraturan Daerah
tentang Rencana Pembangunan Jangka Panjang Daerah dan Rencana Pembangunan Jangka Menengah
Daerah, serta Tata Cara Perubahan Rencana Pembangunan Jangka Panjang Daerah, Rencana
Pembangunan Jangka Menengah Daerah, dan Rencana Kerja Pemerintah Daerah.
Sebagai dokumen perencanaan pembangunan daerah maka Renja Dinas PUP-ESDM DIY
merupakan satu kesatuan dalam sistem perencanaan pembangunan. Ruang lingkup perencanaan
pembangunan daerah meliputi tahapan, tata cara penyusunan, pengendalian dan evaluasi pelaksanaan
rencana pembangunan daerah, yang terdiri atas RPJPD, RPJMD, dan RKPD yang menjadi dasar dalam
penyusunan rencana perangkat daerah yang terdiri Renstra SKPD dan Renja PD. Hubungan dokumen
Perencanaan Pembangunan Daerah dan Dokumen Perencanaan Perangkat Daerah disajikan pada
gambar berikut ini.
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
2
Gambar 1.1. Hubungan Dokumen Rencanan Pembangunan Daerah dengan Dokumen Rencana
Perangkat Daerah
Berdasarkan pemahaman tersebut maka Renja perangkat daerah harus berpedoman kepada Dokumen
Rencana Pembangunan Daerah yang meliputi RPJPD, RPJMD dan RKPD yang telah ditetapkan oleh
pemerintah daerah serta Renstra PD, dalam hal penentuan indikator, target capaian, program dan kegiatan
serta pagu pendanaan, dimana RKPD dan Renstra harus berpedoman pada Program yang terdapat dalam
RPJMD. Selanjutnya Renja perangkat daerah harus sesuai dengan kebijakan yang tercantum dalam
Renstra perangkat daerah, yaitu penetapan tujuan, sasaran, program dan kegiatan serta indikator program
(outcome) dan kegiatan (output). Sehingga perubahan terhadap RKPD mengharuskan Perangkat Daerah
juga melakukan perubahan pada Rencana Kerja.
1.2. Maksud, Tujuan dan Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum
Perumahan dan Energi Sumber Daya Mineral DIY
1.2.1. Maksud Perubahan Renja Dinas Dinas Pekerjaan Umum Perumahan dan Energi Sumber
Daya Mineral Tahun 2020
Pelaksanaan program/kegiatan sampai dengan Triwulan II Tahun Anggaran 2020, telah terjadi
perubahan mendasar yang menyebabkan perlunya dilakukan penyesuaian dan perubahan terhadap Renja
DPUP-ESDM Tahun 2020. Perubahan Renja sebagaimana diatur melalui Peraturan Menteri Dalam Negeri
Nomor 86 Tahun 2017 tentang Tata Cara Perencanaan, Pengendalian, dan Evaluasi Pembangunan
Daerah, Tata Cara Evaluasi Rancangan Peraturan Daerah tentang Rencana Pembangunan Jangka
Panjang Daerah dan Rencana Pembangunan Jangka Menengah Daerah, serta Tata Cara Perubahan
Rencana Pembangunan Jangka Panjang Daerah , Rencana Pembangunan Jangka Menengah Daerah,
DITJEN BINA BANGDA
Dokumen Rencana Perangkat Daerah
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
3
dan Rencana Kerja Pemerintah Daerah, pada pasal 343 ayat (1) yang menyebutkan bahwa Perubahan
RKPD dan Renja Perangkat Daerah dapat dilakukan apabila berdasarkan hasil evaluasi pelaksanaannya
dalam tahun berjalan menunjukan adanya ketidaksesuaian dengan perkembangan keadaan, meliputi:
a) Perkembangan yang tidak sesuai dengan asumsi prioritas pembangunan daerah, kerangka
ekonomi daerah dan keuangan daerah, rencana program dan kegiatan RKPD berkenaan; dan/atau
b) Keadaan yang menyebabkan saldo anggaran lebih tahun anggaran sebelumnya harus digunakan
untuk tahun berjalan.
Lebih lanjut dalam pasal tersebut pada ayat (4) disebutkan bahwa Perubahan RKPD sebagaimana
dimaksud ayat (1) dapat dilakukan tanpa melalui tahapan evaluasi dalam hal terjadi kebijakan nasional,
keadaan darurat, keadaan luar biasa, dan perintah dari Peraturan Perundang-undangan yang lebih tinggi
setelah RPJMD ditetapkan.
Kejadian wabah pandemi Corona Virus Disease 2019 (Covid-19) yang melanda dunia telah banyak
menyebabkan banyak korban jiwa, tidak terkecuali di Indonesia dan Daerah Istimewa Yogyakarta. Hal ini
mendasari ditetapkannya kondisi Bencana Nasional Non Alam oleh Presiden Republik Indonesia melalui
Keputusan Presiden Republik Indonesia Nomor 12 Tahun 2020 yang ditindaklanjuti dengan penetapan
Tanggap Darurat Bencana Daerah Istimewa Yogyakarta oleh Gubernur DIY melalui Keputusan Gubernur
Daerah Istimewa Yogyakarta Nomor 65/KEP/2020. Kondisi bencana daerah ini menjadikan perlu dilakukan
tindakan-tindakan re-focusing dan re-alokasi program kegiatan pembangunan yang tercantum di
Perubahan RKPD sebagaimana termaktub dalam Peraturan Menteri Dalam Negeri Nomor 86 Tahun 2017
pasal 343 ayat (4) yang telah disampaikan di atas.
Perubahan Renja Dinas PUP-ESDM DIY dimaksudkan untuk menyelaraskan terhadap Perubahan RKPD
Tahun 2020 yang ditetapkan dengan Peraturan Kepala Daerah dan menjadi landasan penyusunan
penyusunan Kebijakan Umum Perubahan Anggaran (KUPA) dan Prioritas Plafon Anggaran Sementara
Perubahan (PPASP) Tahun 2020 yang disepakati bersama antara Gubernur dengan Dewan Perwakilan
Rakyat Daerah (DPRD) Daerah Istimewa Yogyakarta.
Sehubungan dengan hal-hal tersebut di atas, untuk menjamin konsistensi antara perencanaan
pembangunan daerah, rencanan perangkat daerah serta penganggaran, maka perlu disusun Perubahan
Rencana Kerja Dinas PUP-ESDM Tahun 2020.
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
4
1.2.2. Tujuan Perubahan Renja Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya
Mineral DIY Tahun 2020
Berdasarkan penjelasan di atas, tujuan Perubahan Renja Dinas PUP-ESDM Tahun 2020 adalah:
a) Melakukan penyesuaian program dan kegiatan terkait adanya wabah pandemi virus Covid-19 yang
memerlukan penanganan secara cepat dengan memperhatikan prioritas nasional, regional dan
daerah;
b) Melakukan penyesuaian berdasarkan asumsi makro ekonomi yang telah disepakati pada APBD
Tahun 2020 terhadap kemampuan fiskal daerah;
c) Melakukan penyesuaian terhadap Perubahan RKPD Tahun 2020;
d) Menyediakan dokumen perencanaan tahunan sebagai acuan dalam pelaksanaan
program/kegiatan sesuai dengan tugas pokok dan fungsi Dinas PUP-ESDM DIY dalam rangka
mencapai visi dan misi Pemerintah DIY.
e) Menjadi dasar penambahan kegiatan baru, penghapusan kegiatan, perubahan indikator kinerja,
perubahan target, dan perubahan pagu anggaran.
1.2.3. Dasar Pertimbangan Perubahan Renja Dinas Pekerjaan Umum Perumahan dan Energi
Sumber Daya Mineral DIY Tahun 2020
Dasar pertimbangan Perubahan Rencana Kerja Dinas PUP-ESDM Tahun 2020 mencakup hal-hal pokok
sebagai berikut:
1. Adanya wabah pandemi virus Covid-19 yang memerlukan penanganan tindakan re-focusing dan
re-alokasi program kegiatan Tahun 2020.
2. Adanya penyesuaian asumsi kerangka ekonomi daerah dan kerangka pendanaan dengan
perkembangan kondisi terkini;
4. Adanya penambahan kegiatan baru, penghapusan kegiatan, perubahan indikator kinerja, target,
lokasi, serta pagu anggaran.
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
5
BAB 2 EVALUASI RENJA
Dinas PUPESDM DIY adalah dinas daerah yang mempunyai hubungan dengan dua kementerian
terkait pelaksanaan urusan pemerintahan konkuren, yaitu : Kementerian Pekerjaan Umum Dan Perumahan
Rakyat dan Kementerian Energi dan Sumberdaya Mineral, sehingga kebijakan nasional dari kedua
kementerian tersebut menjadi acuan pelaksanaan kebijakaan di daerah.
Kementerian Pekerjaan Umum dan Perumahan Rakyat yang menangani infrastruktur pekerjaan
umum dan perumahan rakyat sebagai bagian dari bidang infrastruktur berkewajiban untuk mendukung hal
tersebut melalui pelaksanaan pembangunan yang terpadu, efektif dan efisien dengan memperhatikan
pengarusutamaan pembangunan yang berkelanjutan, gender serta berlandaskan tata kelola pemerintahan
yang baik dalam proses pencapaian tujuan pembangunan nasional.
Pengarusutamaan pembangunan berkelanjutan merupakan upaya penerapan prinsip
pembangunan berkelanjutan secara seimbang dan sinergis dalam memenuhi kebutuhan sekarangtanpa
mengorbankan pemenuhan kebutuhan generasi masa depan. Dalam pelaksanaanpembangunan
berkelanjutan diperlukan keterpaduan antara 3 (tiga) pilar yaitu sosial, ekonomi dan lingkungan yang
kemudian diperkuat dengan dimensi kelembagaan.
Pelaksanaan pembangunan berkelanjutan secara umum tercermin dalam indikator–indikator
antara lain: (1) indikator ekonomi makro seperti pertumbuhan ekonomi dan dampak ekonomi; (2) tingkat
partisipasi masyarakat pelakupembangunan, partisipasi masyarakat marginal/minoritas (kaum miskin dan
perempuan), dampak terhadap struktur sosial masyarakat, serta tatanan atau nilai sosial yang berkembang
di masyarakat; dan (3) dampak terhadap kualitas air, udara dan lahan serta ekosistem (keanekaragaman
hayati).
infrastruktur pekerjaan umum dan perumahan rakyat, harus selalu berlandaskan pada prinsip
pembangunan berkelanjutan yang memperhatikan daya dukung agar hasil pembangunan selaindapat
dimanfaatkan untuk generasi sekarang juga dapat diwariskan pada generasi mendatang.
Kondisi yang dikemukakan oleh Kementerian Pekerjaan Umum yang mempengaruhi kondisi
Daerah Istimewa Yogyakarta di antaranya adalah :
a. Menurunnya fungsi jaringan irigasi, disebabkan oleh tingginya tingkat kerusakan karena umur
konstruksi dan bencana alam disamping rendahnya keterlibatan petani dan stakeholders lainnya
dalam pengelolaan jaringan irigasi, sehingga menurunnya kinerja layanan jaringan irigasi yang ada
dalam mendukung pemenuhan produksi pangan.
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
6
b. Berkembangnya daerah permukiman dan industri telah menurunkan area resapan air dan
mengancam kapasitas lingkungan dalam menyediakan air.
c. Target tingkat pelayanan air minum saat ini belum mampu terpenuhi.
d. Upaya meningkatkan kinerja TPA yang berwawasan lingkungan di Perkotaan Yogyakarta sampai
saat ini belum menunjukkan hasil yang menggembirakan.
e. Dalam penanganan air limbah jumlah keluarga yang memiliki akses terhadap sarana sanitasi dasar
meningkat, namun pencapaian tersebut masih sebatas pada akses ke jamban dan toilet saja.
f. Tingkat pemenuhan kebutuhan rumah masih menjadi permasalahan, sementera itu, setiap tahun
terjadi penambahan kebutuhan rumah akibat penambahan keluarga baru.
g. Implementasi kebijakan pembinaan jasa konstruksi, dalam konteks mikro (tata kelola
kepemerintahan yang baik), konteks messo (usaha dan pengusahaan konstruksi), serta konteks
makro (kerjasama, persaingan global dan liberalisasi jasa konstruksi) belum mencapai sasaran
secara optimal. Masih sering dijumpai mutu konstruksi yang belum memenuhi standar.
Adapun kondisi yang dikemukakan oleh Kementerian Energi dan Sumber Daya Mineral yang
mempengaruhi kondisi Daerah Istimewa Yogyakarta di antaranya adalah:
a. Penurunan produksi minyak dan gas bumi nasional, sehingga disisi hilir pemerintah masih harus
mengimpor dalam jumlah relative besar untuk memenuhi kebutuhan bakar di dalam negeri;
b. Bauran Energi (emergi mix) Nasional masih didominasi oleh BBM;
c. Belum optimalnya pengembangan energi alternatif pengganti BBM;
d. Belum optimalnya pemanfaatan gas bumi dalam negeri;
e. Belum optimalnya investasi untuk pengembangan sektor energi dan sumberdaya mineral,
dikarenakan tumpang tindihnya wilayah pertambangan dengan kehutanan, perkebunan, lamanya
pinjam pakai wilayah kehutanan;
pendanaan ketenagalistrikan oleh pemerintah;
g. Masih banyaknya perizinan Pertambangan di daerah yang belum mengikuti kaidah pertambangan
yang baik dan benar, serta masih maraknya aktivitas pertambangan rakyat yang illegal;
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
7
h. Konservasi air tanah di cekungan air tanah menghadapi kendala dengan makin maraknya aktivitas
pengambilan air tanah tanpa izin serta pengambilan air tanah yang kurang terkendali terutama di
kawasan perindustrian dan kota besar.
Rumusan pernyataan tujuan dan sasaran Renja Dinas PUPESDM DIY beserta indikator kinerjanya
disajikan dalam Tabel 2.1 .
NO. PROGRAM INDIKATOR KINERJA SATUAN TARGET
1.03 PEKERJAAN UMUM
1 Program Administrasi
Penanganan sampah sistem regional
5 Program Pengelolaan dan Pengembangan Sistem
Penyediaan Air Minum
liter/detik 750
m 91.174
Pengelolaan Air Baku % 62,40
7 Program Pengembangan dan
Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
% 74,50
Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
% 77,82
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
8
8 Program Penyelenggaraan Jalan Jaringan jalan provinsi dalam kondisi mantap
% 74,06
% 75,13
LHU 800
% 32,43
% 12
% 72,16
titik
48
titik
32
MINERAL
RT 9.848 RT
unit 72
izin 45
dan Geologi
dusun 76
% < 20%
izin 45
izin 26
% 7,6
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
9
Yogyakarta menetapkan rangkaian program sesuai dengan Urusan Wajib dan Urusan Pilihan yang
dilaksanakan oleh SKPD di lingkungan Pemerintah Daerah Istimewa Yogyakarta.
Penetapan program dan kegiatan disesuaikan dengan :
1. Penanggulangan kemiskinan;
2. Pengembangan daerah terisolir;
3. Program strategis daerah;
4. Pendayagunaan potensi sumber daya air, energi dan sumber daya mineral;
5. Visi Gubernur dalam lima tahun mendatang (2017-2022) yaitu Menyongsong "Abad Samudera
Hindia" untukKemuliaan Martabat Manusia Jogja.
Sesuai dengan arahan RPJMD, RKPD dan Perubahan RENSTRA 2017 – 2022 Dinas PUPESDM DIY,
pada tahun 2020 Dinas PUPESDM DIY akan melaksanakan urusan wajib Pekerjaan Umum, Perumahan
dan urusan pilihan Energi Sumber Daya Mineral melalui 14 program dengan 44 kegiatan. Rincian Program
dan Kegiatan Tahun 2020 dapat disajikan pada Tabel 2.2. dan Evaluasi Renja Dinas PUPESDM DIY yang
telah mengacu pada Perubahan RKPD 2020 dan Perubahan Renstra Dinas PUPESDM DIY disajikan pada
Tabel 2.4.
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
10
Tabel 2.2. Rumusan Rencana Program dan Kegiatan Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY Tahun 2020 dan Prakiraan Maju Tahun 2021
Kode Urusan/Bidang Urusan Pemerintahan Daerah dan Program/Kegiatan
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
192.377.967.000 456.835.563.240
Terwujudnya administrasi perkantoran yang mendukung kelancaran tugas dan fungsi SKPD
DIY 100 % 15.883.984.000
APBD 100 % 20.000.000.000
Alat Listrik DIY 124 jenis 12.220.000.000
APBD pemenuhan pelayanan admistrasi perkantoran 100%
12.000.000.000
Barang Cetakan 35 jenis
Belanja pengisian tabung tabung pemadam kebakaran 25 unit
Jasa kebersihan kantor 1 tahun
Jasa Komunikasi, Listrik, Air 1 tahun
Jasa Laundry 1 tahun
Jasa Pembasmi tikus 1 tahun
jasa Pemeliharaan dan Perizinan Kendaran Dinas/Operasional 108 unit : 76 unit roda 2; 3 unit Roda 3; 22 unit roda 4; 7 unit roda 6
Jasa Surat Menyurat 7500 surat
Penatan Arsip 76000 arsip
Surat Kabar/Majalah 10 SKH
Jasa Keamanan Kantor DIY 1 tahun 2.136.000.000
APBD pemenuhan pelayanan admistrasi perkantoran 100%
5.000.000.000
1.03.1.03.01.00.01.035 Penyediaan Rapat- Rapat, Koordinasi dan Konsultasi
Konsultasi dan Koordinasi Dinas PUP ESDM DIY Dalam Daerah Terlaksana Dengan Baik
DIY 1 tahun - Golongan IV, 100 kali - Golongan III, 500 kali - Golongan II, 250 kali
1.527.984.000
3.000.000.000
Konsultasi dan Koordinasi Dinas PUP ESDM DIY Dalam Jawa Terlaksana Dengan Baik
1 tahun - Golongan IV, 100 kali - Golongan III, 100 kali - Golongan II, 50 kali
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
11
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Konsultasi dan Koordinasi Dinas PUP ESDM DIY Luar Jawa Terlaksana Dengan Baik
1 tahun - Golongan IV, 50 kali - Golongan III, 50 kali - Golongan II, 50 kali
Makan dan minum rapat tersedia sesuai kebutuhan
7500 OS
Persentase ketersediaan sarana prasarana aparatur yang mendukung kelancaran tugas dan fungsi SKPD
DIY 100 % 3.515.000.000
APBD 100 % 9.750.000.000
Tersedianya Mebeleuir : - Meja Kerja DIY - 9 unit 450.000.000
APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
2.000.000.000
- 12 unit - 5 unit - 2 unit
Tersedianya perlengkapan kantor : - Komputer - Printer - UPS - Laptop - Scanner
- 10 Unit - 9 unit - 30 unit - 5 unit - 1 unit
1.03.1.03.01.00.02.109. Pemeliharaan Rumah dan Gedung Kantor
Pemeliharaan bangunan gedung tempat kerja DIY 3 gedung :11.941 m2 1.200.000.000 APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
1.500.000.000
1.03.1.03.01.00.02.112. Pemeliharaan Kendaraan Dinas/Operasional
terpeliharanya kendaraan dinas/operasional SKPD
DIY 108 unit : 76 unit roda 2; 3 unit Roda 3; 22 unit roda 4; 7 unit roda 6
1.500.000.000 APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
2.500.000.000
1.03.1.03.01.00.02.111.
DIY - 3 unit - 2 unit - 8 unit
365.000.000 APBD pemenuhan kebutuhan sarana prasarana aparatur 100%
3.750.000.000
1 unit
Pemeliharaan alat-alat kantor: - Sound System - Komputer - Laptop - Monitor - CPU - Hardisk - Printer
- 1 tahun - 80 kali - 48 kali - 10 buah - 8 buah - 8 buah - 20 buah
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
12
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1 tahun
Pemeliharaan perlengkapan kantor: - AC - CCTV - Accu Solar Cell - Faksimili - Mesin Ketik
- 100 kali - 1 tahun - 1 tahun - 5 unit - 3 unit
1.03.1.03.01.00.06 PROGRAM PENINGKATAN PENGEMBANGAN SISTEM PELAPORAN CAPAIAN KINERJA DAN KEUANGAN
Persentase ketersediaan sarana prasarana aparatur yang mendukung kelancaran tugas dan fungsi SKPD
DIY 100 % 730.000.000
APBD 100 % 765.000.000
1.03.1.03.01.00.06.016 Penyusunan Laporan Kinerja SKPD
Bahan penyusunan LKPJ dan LKJ Urusan PU,Perumahan & ESDM TH 2019 DIY 2 dokumen Bahan penyusunan LKPJ dan LKJ Urusan PU, Perumahan & ESDM TH 2019
15.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
15.000.000
1.03.1.03.01.00.06.017 Penyusunan Laporan Keuangan SKPD
Laporan Aset dan Laporan Persediaan Semesteran DIY 2 laporan 120.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
120.000.000
Laporan Keuangan Semester 2 laporan
Laporan Keuangan Tahunan Gabungan 1 laporan
Laporan Keuangan Audited 1 laporan
Laporan Keuangan bulanan 12 laporan
Laporan Keuangan Triwulan 4 laporan
1.03.1.03.01.00.06.018 Penyusunan Rencana Program Kegiatan SKPD serta Pengembangan Data dan Informasi
DPA 2020 DIY 1 dokumen 565.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
600.000.000
Forum PD 1 kesepakatan
Publikasi Publikasi media cetak dan publikasi media elektronik
Renja SKPD Perubahan TH 2020 1 dokumen
Renja SKPD TH 2021 1 dokumen
ROPK 2020 1 dokumen ROPK
tenaga pendamping SKPD 6 bulan
1.03.1.03.01.00.06.019 Monitoring dan Evaluasi Pelaksanaan Program Kegiatan SKPD
Laporan Monitoring dan Evaluasi Pelaksanaan Program Dan Kegiatan SKPD
DIY 12 laporan Monitoring dan Evaluasi Pelaksanaan Program Dan Kegiatan SKPD
30.000.000 APBD peningkatan pengembangan sistem laporan capaian kinerja dan keuangan 100%
30.000.000
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
13
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1.03.1.03.01.00.52. PROGRAM PENYELENGGARAAN JALAN
1. Jaringan jalan provinsi dalam kondisi mantap 2. Penambahan Jaringan Jalan Baru
DIY 1. 74,06% 2. 46,99 %
97.833.269.000 APBD 1. 74,66 % 2. 69,11 %
226.118.416.240
1.03.1.03.01.00.52.001. Peningkatan/Rehabilitasi Jalan dan Jembatan
Peningkatan Ruas Jalan Brosot-Toyan DIY 2 KM 29.600.000.000 APBD Peningkatan 17,070 Km jaringan jalan dari kondisi rusak ringan dan berat menjadi kondisi baik dan sedang
116.870.706.940
Peningkatan Ruas Jalan Pandanan-Candirejo 2,4 KM
1.03.1.03.01.00.52.002. Pemeliharaan Rutin Jalan dan Jembatan
Inspeksi Kondisi Jalan DIY 1 dokumen 20.353.512.000 APBD 1. Terpeliharanya 78 ruas jalan propinsi
18.047.709.300
Inspeksi kondisi jembatan 1 dokumen 2. Terpeliharanya 241 buah jembatan
Terpeliharanya jalan propinsi 78 ruas (727,2 km) 3. Inspeksi kondisi jembatan
Terpeliharanya jembatan 241 buah 4. Inspeksi Kondisi Jalan
1.03.1.03.01.00.52.003. Pembangunan Jalan dan Jembatan
Pembangunan Jalan Akses Kawasan Industri Piyungan DIY 1 Km 47.780.000.000 APBD Tersedianya satu akses baru kawasan Wisata Prambanan dan Ratu Boko menuju Kawasan Gunung Api Purba Nglanggeran dan Kawasan Bentang Karst
91.026.000.000
Pengadaan lahan untuk pembangunan jalan Jangkaran - Pantai Congot 1.365 m2
1.03.1.03.01.00.52.005. Persertifikatan Tanah Jalan Provinsi
Pensertifikatan Tanah Jalan Provinsi
174.000.000
1.03.1.03.01.00.60 PROGRAM PENGELOLAAN DAN PENGEMBANGAN SARANA PRASARANA SANITASI
1. Penanganan sampah sistem regional 2. Penanganan Lokasi genangan 3. Layanan Sistem air limbah terpusat
DIY 1. 660 Ton/hari 2. 1 lokasi 3. 25.200 SR
25.545.000.000 APBD 1. 720 ton/hari 2. 1 lokasi 3. 26.300 SR
34.292.000.000
1.03.1.03.01.00.60.006 Pengembangan Sarana Prasarana Penanganan Sampah
2. Drainase DIY 965 meter 14.000.000.000 APBD Peningkatan sampah yang dikelola di TPST Regional menjadi sebesar 660 ton/hari
17.972.000.000
Pekerjaan tanggul penahan dinding lanjutan 2019, drainase dan jalan operasional di TPA Piyungan : 1. Tanggul penahan
450 meter
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
14
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Pemantauan dan Pengendalian Kualitas Air Masuk/Keluar IPAL DIY Kualitas Air dengan BOD Max 75 mg/ltr
2.750.000.000 APBD Mempertahankan layanan sistem air limbah terpusat sebesar 26.300 SR
2.000.000.0000
Pemantauan dan Pengendalian Kualitas Biota/Coliform Coliform Max 10.000 JPT/100ml
Pemantauan dan Pengendalian Kualitas Udara NH3 max 1,500 ppm dan H2S max 0,010 ppm
Pemantauan dan Pengendalian Unsur Dalam Sludge Baku mutu Timbal (Pb) < 10 mg/lt
Pemeliharaan Instalasi Pengolahan Air Limbah 68 unit
Pemeliharaan Jalan Kawasan IPAL 2 km
1.03.1.03.01.00.60.001 Pemeliharaan Jaringan Air Limbah Domestik Terpusat
Pemantauan dan Pengendalian Kualitas Air Limbah Jaringan DIY kualitas air Baku mutu Timbal (Pb) < 10 mg/lt
3.270.000.000 APBD Mempertahankan layanan sistem air limbah terpusat sebesar 26.300 SR
3.000.000.000
Pemantauan dan Pengendalian Kualitas Air Tanah di Jaringan kualitas air tanah dengan kadar Coliform Max 50 JPT/100 ml
Pemeliharaan jaringan air Limbah 234 km
1.03.1.03.01.00.60.002 Pemeliharaan Instalasi Pengolahan Lumpur Tinja
Operasional dan Pemeliharaan APLT (kap. 100M3/hari) DIY 1 unit 2.500.000.000 APBD Mempertahankan layanan pengolahan air limbah terpusat dan lumpur tinja (IPLT) sebesar 100 m3/hari
1.320.000.000
Pemantauan dan Pengendalian Kualitas Lumpur Tinja dari Truck tangki PH berkisar 6-9
Pemeliharaan Instalasi Pengolah Lumpur Tinja 1 Unit
Pengendalian Kualitas Air Masuk/Keluar IPLT kualitas Air dari oulet IPLT dengan BOD Max75 mg/ltr
1.03.1.03.01.00.60.003 Pengembangan Sarana dan Prasarana Drainase
Pembangunan Saluran Drainase di Kawasan Desa Ngestiharjo, Kasihan, Bantul (lanjutan)
DIY 300 m 3.025.000.000 APBD Penanganan 1 Lokasi genangan
10.000.000.000
Penyusunan DED Kawasan JEC 1 dokumen
Penyusunan DED Saluran Drainase di Jalan Jogokaryan 1 dokumen, 550 meter
1.03.1.03.01.00.61 PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1. Pengelolaan Air Curah pada SPAM Regional 2. Panjang jaringan distribusi SPAM regional
DIY 1. 750 liter/detik 2. 91.174 m
14.459.114.000 APBD 1. 1.100 liter/detik 2. 92.374 m
74.061.600.000
Penyusunan AMDAL pengembangan SPAM Banyusoco DIY 1 dokumen 4.421.056.000 APBD 1.Penambahan penduduk berakses air minum 2. Penambahan Penduduk berakses Air Minum menuju Bandara NYIA, dan Kawasan industri Kulonprogo
10.061.600.000
Tersedianya bahan bangunan untuk pengembangan sistem penyediaan air minum pada kelompok SPAMDES
15 kelompok
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
15
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1.03.1.03.01.00.61.001 Pengelolaan Sistem Penyediaan Air Minum
1. Pengadaan pompa dozing (PAC & kaporit) 2. Pengadaan bahan kimia utk operasional
DIY 2 unit; 1 tahun
10.038.058.000 APBD Meningkatkan ketersediaan air curah dari 400 lt/dtk menjadi 700 Lt/Detik
64.000.000.000
1 Paket
2 unit
- 1 tahun; - 4 unit
1 tahun
1 paket
Operasional dan Pemeliharaan Alat kerja instalasi : - O & P Peralatan kerja
10 jenis
- 64 Km - 5 buah - 1 Paket
Pemeliharaan Unit Instalasi Clearweel : - Pemeliharaan rutin unit clearwell - Pengadaan pompa
1 tahun 2 unit
Pengadaan Alat Laboratorium Air Minum : - Pengadaan alat lab. Air & kalibrasi
4 jenis
43 orang
1.03.1.03.01.00.62 PROGRAM PENGELOLAAN DAN PENGEMBANGAN AIR BAKU
1. Penambahan kapasitas air baku 2. Air baku yang dipertahankan ketersediaannya
DIY 1. 19,50 liter/detik 2. 62,40 liter/detik
12.150.000.000 APBD 1. 19,50 liter/detik 2. 73,20 liter/detik
37.075.000.000
Pembangunan Embung Dlingseng Desa Banjaroya, Kec. Kalibawang, Kab. Kulonprogo
1 embung 6.150.000.000 APBD Penambahan penyediaan air baku sebesar 34,00 Liter/detik
24.075.000.000
Rekomendasi kebijakan sumber daya air melalui Dewan SDA 1 Dokumen Rekomendasi kebijakan sumber daya air
1.03.1.03.01.00.62.002 Pengelolaan Air Baku Operasi & Pemeliharaan Pos Hidrologi DIY 64 Pos Hidrologi 6.000.000.000 APBD Mempertahankan suply air baku di DIY sebesar 76,95 ltr/det
13.000.000.000
Pengelolaan Web dan Data SISDA 1 sistem/aplikasi
Penyusunan AKNOP Embung kewenangan Pemda DIY 1 dokumen AKNOP untuk 11 embung
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
16
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
1.03.1.03.01.00.63 PROGRAM PENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI
1. Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
2. Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
DIY 1. 74,50 % 2. 77,82 %
19.891.600.000 APBD 1. 75,85 % 2. 82,41 %
48.000.000.000
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul DIY 1 dokumen 7.891.600.000 APBD Peningkatan Jaringan Irigasi sebesar 8.650 m
30.000.000.000
Updating PAI dan AKNPI 41 Daerah Irigasi 1 dokumen
1.03.1.03.01.00.63.002 Pengelolaan Jaringan Irigasi
Koordinasi Tata Pengaturan SDA DIY Masyarakat P3A/GP3A/IP3A di 41 D.I
12.000.000.000 APBD Dipertahankannya kinerja 41 DI sebesar 77,82%
18.000.000.000
Rekomendasi kebijakan pengelolaan irigasi di DIY melalui Komisi Irigasi 1 dokumen rekomendasi
1.03.1.03.01.00.56 PROGRAM PELAYANAN JASA PENGUJIAN DAN PEMBINAAN JASA KONSTRUKSI
1. Peningkatan kinerja tenaga konstruksi dan masyarakat jasa konstruksi
2. Sertifikat/ Laporan Hasil Uji yang diterbitkan
DIY
2.370.000.000 APBD
6.773.547.000
Inventarisasi data penyelenggaraan konstruksi DIY 1 laporan 1.000.000.000 APBD penambahan sejumlah 300 orang tenaga ahli konstruksi bersertifikat dan 3000 orang masyarakat terlayani informasi jasa konstruksi
2.516.220.000
Pengelolaan aplikasi sistem informasi jasa konstruksi 1 laporan
Penyebaran informasi dan pameran teknologi ke-PU-an melalui Klinik Konstruksi
1 laporan, 50 orang
Penyusunan informasi harga satuan bahan bangunan 12 laporan, 2750 orang
Tenaga ahli konstruksi bersertifikat 150 orang
Terselenggaranya peningkatan kualitas jasa konstruksi melalui pembinaan jasa konstruksi
80 orang
Laporan Hasil Uji
DIY 800 LHU
4.257.327.000
50.271.640.000 108.384.500.000
1.04.1.03.01.00.24 PROGRAM PENYELENGGARAAN PERUMAHAN
1. Penanganan Rumah Tidak Layak Huni 2. Perwujudan kawasan perumahan sesuai RTRW 3. Cakupan penanganan kawasan kumuh
DIY 1. 32,43 % 2. 12 % 3. 72,16 %
20.071.640.000 APBD 1. 43,10 % 2. 16 % 3. 86,08 %
72.384.500.000
Penanganan PSU Permukiman Kumuh Kecamatan Pengasih Kabupaten Kulonprogo
DIY 0,825 Ha
5.000.000.000
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
17
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Terlaksananya Penanganan Rumah Tidak Layak Huni Kab. Gunungkidul 515 unit 19.271.640.000 APBD Berkurangnya 4000 RTLH dan tersedianya data bagi pengurangan N+1
65.884.500.000
Terlaksananya Penanganan Rumah Tidak Layak Huni Kab. Kulonprogo 583 unit
1.04.1.03.01.00.24.003 Pengembangan Perumahan
Capaian Pendataan SPM Kawasan Rawan Bencana DIY DIY 1 dokumen pendataan SPM kawasan rawan bencana DIY
300.000.000 APBD pengembangan perumahan sesuai RTRW
1.500.000.000
Monitoring dan Evaluasi (monev) Perumahan dan Kawasan Permukiman DIY 1 laporan (monev dan pendataan basis data PKP)
Rekomendasi Kebijakan PKP 1 laporan kinerja Pokja PKP
1.04.1.03.01.00.25 PROGRAM PENYELENGGARAAN PRASARANA SARANA UTILITAS KAWASAN
1. Penyediaan PSU layak di kawasan permukiman 2. Penyediaan infrastruktur di kawasan strategis provinsi
DIY 1. 48 lokasi 2. 32 lokasi
30.200.000.000 APBD 1. 48 lokasi 2. 32 lokasi
36.000.000.000
Bantuan Prasarana, Sarana dan Utilitas Umum pada kawasan permukiman
DIY 16 titik
18.000.000.000
1.04.1.03.01.00.25.002 Penyelenggaraan Prasarana, Sarana, Dan Utilitas Umum (PSU) Kawasan Strategis
Penyediaan PSU di Kawasan Strategis Provinsi DIY 2 lokasi 27.000.000.000 APBD Peningkatan kualitas PSU pada 32 titik di Kawasan Strategis Propinsi
18.000.000.000
Struktur, Arsitektur dan Atap Bangunan VIP Room Bandara Baru YIA 1 unit gedung
2.05 ENERGI DAN SUMBER DAYA MINERAL
14.048.520.000 31.428.018.000
1. Penambahan jumlah rumah tangga yang menikmati listrik 2. Bangunan/gedung pemerintah, komersial dan industri yang telah
diaudit energi 3. Penambahan izin ketenagalistrikan sesuai ketentuan
DIY 1. 9848 RT 2. 72 Unit 3. 45 izin
7.069.920.000 APBD 1. 11.848 RT 2. 82 unit 3. 60 izin
16.346.088.000
2.05.1.03.01.00.31.002 Pengembangan dan Pemanfaatan Energi dan Ketenagalistrikan
Audit Energi DIY 10 Gedung 5.906.640.000 APBD Peningkatan jumlah rumah tangga miskin yang menikmati listrik sejumlah 2000 RT
5.060.000.000
2.05.1.03.01.00.31.003 Pengaturan dan Pembinaan Energi dan Ketenagalistrikan
Monitoring Pemanfaatan EBT di DIY DIY 1 laporan 450.000.000 APBD Peningkatan jumlah bangunan/gedung pemerintah, komersial dan industri yang melaksanakan konservasi energi sejumlah 10 bangunan
9.625.000.000
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
18
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
Pembinaan Pelaksanaan Perijinan Ketenagalistrikan di 4 Kabupaten dan 1 Kota
50 unit usaha
25 unit usaha
Pengawasan dan Pengendalian kegiatan energi baru terbarukan DIY 2 laporan 713.280.000 APBD Penambahan 15 izin ketenagalistrikan yang sesuai ketentuan
1.661.088.000
Pengoperasian, Identifikasi dan Pendataan pembangkit listrik EBT di wilayah Bantul dan Kulon Progo
1 dokumen
1 dokumen
1 aplikasi
1 aplikasi
2.05.1.03.01.00.32 PROGRAM PENGELOLAAN AIR TANAH DAN GEOLOGI
1. Cakupan penyediaan air bersih di daerah sulit air 2. Rerata penurunan muka air tanah terhadap ketebalan akuifer 3. Penambahan jumlah izin air tanah yang sesuai dengan ketentuan
DIY 1. 76 dusun 2. < 20 % 3. 45 izin
4.600.600.000 APBD 1. 79 dusun 2. <20 % 3. 60 izin
12.018.930.000
2.05.1.03.01.00.32.003 Pendayagunaan Air Tanah dan Geologi
Terlaksananya Pembangunan Sumur Bor Air Tanah Dalam dan sumur resapan pada Daerah Sulit Air di Kabupaten Bantul
DIY 1 unit dan 20 unit 1.200.000.000 APBD Penyediaan air bersih 10 lt/detik dari sumber air tanah dalam di 10 lokasi
6.269.010.000
Terlaksananya Pembangunan Sumur Bor Air Tanah Dalam dan sumur resapan pada Daerah Sulit Air di Kabupaten Gunungkidul
1 unit dan 20 unit
2.05.1.03.01.00.32.001 Pengawasan Air Tanah dan Geologi
Pendataan dan Pencatatan volume air tanah untuk penghitungan NPA di wilayah Bantul dan Kulon progo
DIY 1 dokumen 1.300.600.000 APBD Penambahan 15 izin air tanah yang sesuai dengan ketentuan
1.663.750.000
Pendataan dan Pencatatan volume air tanah untuk penghitungan NPA di wilayah Sleman, Yogyakarta dan Gunungkidul
1 dokumen
Pendataan Pengguna Air Tanah Belum Berizin di Wilayah Bantul dan Kulon progo
1 dokumen
1 dokumen
Pengawasan dan Pengendalian pelaksanaan perizinan air tanah di wilayah DIY
2 laporan
Penyusunan E- Pelaporan Perizinan Air Tanah BP3ESDM Bantul dan Kulon progo
1 aplikasi
Penyusunan E- Pelaporan Perizinan Air Tanah BP3ESDM Sleman Yogyakarta dan Gunungkidul
1 aplikasi
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
19
Indikator Kinerja Program/Kegiatan
Rencana Tahun 2020
Lokasi Target Capaian Kinerja Kebutuhan Dana/Pagu
Indikatif
Indikatif
2.05.1.03.01.00.32.002 Peningkatan Perlindungan Air Tanah dan Geologi
Monitoring dan Evaluasi Fluktuasi Air Tanah DIY 1 laporan 2.100.000.000 APBD Pengendalian pemanfaatan air tanah agar masih berada pada zona aman (<20%)
4.086.170.000
Pembinaan Pelaksanaan Pemanfaatan Air Tanah di 4 Kabupaten dan 1 Kota 2 laporan,80 unit usaha
Pembuatan sumur pantau air tanah dalam 4 unit
Perbaikan/Pemeliharaan AWLR dan sumur pantau air tanah dalam 4 unit
Rekomtek Izin Pemanfaatan Air Tanah di 4 Kabupaten dan 1 Kota 1 laporan, 120 unit usaha
2.05.1.03.01.00.33 PROGRAM PENGELOLAAN PERTAMBANGAN
DIY 1. 7,6 % 2. 26 izin
2.378.000.000 APBD 1. 7,7 % 2. 33 izin
3.063.000.000
Pembinaan Pelaksanaan Usaha Pertambangan DIY 60 unit usaha 1.394.000.000 APBD Pengusahaan Kawasan Peruntukan Pertambangan sebesar 7,7%
1.863.000.000
Penyusunan Dokumen Lingkungan untuk kegiatan Pertambangan Rakyat di 3 Kabupaten ( pasir dan batu di sleman, bantul, Kulonprogo : emas di kokap, andesi dll di Guungkidul)
3 dokumen
Rencana Detail Blue Print Pengembangan dan Pemberdayaan Masyarakat sekitar WIUP
1 dokumen rencana Pengembangan dan Pemberdayaan Masyarakat sekitar WIUP
2.05.1.03.01.00.33.001 Pengawasan dan Pengendalian Pengusahaan Pertambangan
Identifikasi Penambangan Tanpa Ijin (PETI) wilayah Bantul & Kulon Progo DIY 1 dokumen berisi hasil identifikasi PETI
984.000.000 APBD Penambahan jumlah izin Pengusahaan Pertambangan yang sesuai dengan ketentuan sejumlah 7 izin
1.200.000.000
1 dokumen berisi hasil identifikasi PETI
Operasional Inspektur Tambang 1 dokumen pengawasan dan pengendalian teknis Ijin usaha pertambangan
Pendataan dan Penghitungan Volume Produksi Usaha Pertambangan Wilayah Bantul & Kulon Progo
1 Dokumen
1 Dokumen
Penyusunan E- Pelaporan Perizinan Pertambangan Wilayah Bantul & Kulon Progo
1 Aplikasi
1 Aplikasi
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
20
Tabel 2.3. Program, Kegiatan Dan Paket Pekerjaan Melalui BLP 2020
(Status 30 Juni 2020)
Bina Marga 9 21 6 2 7 6
Cipta Karya 5 10 5 1 4 0
Perumahan 4 12 10 0 2 0
ESDM 5 16 14 0 0 2
Sekretariat 11 2 2 0 0 0
BP3 ESDM 3 0 0 0 0 0
Balai PJK 2 0 0 0 0 0
Balai PIALAMP 4 10 7 1 2 0
JUMLAH 49 89 54 6 17 12
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
21
Tabel 2.4. Evaluasi Renja Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral Daerah Istimewa Yogyakarta
No Sasaran Program/ Kegiatan
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
1 Meningkatnya Capaian Pelaksanaan Program Pendukung Sasaran Renstra SKPD
PROGRAM ADMINISTRASI PERKANTORAN
100% 11.398.9 10.000
100% 12.454.9 44.290
100% 13.268. 509.380
47.2 5.543.2 61.211
47,2 17.998. 205.501
100% 9.033.60 2.000
100% 7.364.32 1.907
100% 3.717.9 24.000
42.65 1.164.7 63.686
42,65 8.529.0 85.593
PROGRAM PENINGKATAN PENGEMBANGAN SISTEM PELAPORAN CAPAIAN KINERJA DAN PELAPORAN KEUANGAN
Persentase peningkatan pengembangan sistem laporan capaian kinerja dan keuangan
100% 967.770. 000
100% 971.540. 300
100% 850.434 .000
35.58 274.041 .500
35,58 1.245.5 81.800
2 Penduduk berakses sanitasi
Penanganan sampah sistem regional
780 ton/hari 25.099.2 00.000
607,65 ton/hari 2.847.90 7.300
660 ton/hari 14.000. 000.000
77,01 11,35 Bidang Cipta Karya
Penanganan Lokasi genangan
27.400 SR 9.099.20 0.000
25.018 SR 5.628.34 4.318
25.200 SR 7.090.2 03.536
25.107 SR 3.078.9 34.100
25.107 SR 8.707.2 78.418
91,63 95,69 Balai PIALAMP
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
22
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pengembangan Sarana dan Prasarana Drainase
Penanganan Lokasi genangan
14.423.0 00.000
Pembanguna n Saluran Drainase di Jalan Kaliurang, Simpang MM UGM, Sleman (lanjutan) (1 paket terselesaikan nya pembanguna n saluran drainase sepanjang 100 m Di jalan Kaliurang, Simpang MM UGM) : 1 lokasi dari 1 lokasi
4.666.73 6.900
Penyusunan DED Saluran Drainase Kawasan Jogja Expo Center (JEC) 1000 meter : 0 dokumen dari 1 dokumen
Pemeliharaa n Saluran Drainase di MM UGM dan di Desa Ngestiharjo, Kasihan, Bantul : 0 Lokasi dari 2 Lokasi
773.337 .000
Penyusunan DED Saluran Drainase Kawasan Jogja Expo Center (JEC) 1000 meter : 0 dokumen dari 1 dokumen
Pemeliharaa n Saluran Drainase di MM UGM dan di Desa Ngestiharjo, Kasihan, Bantul : 0 Lokasi dari 2 Lokasi
182.617 .800
Penyusunan DED Saluran Drainase Kawasan Jogja Expo Center (JEC) 1000 meter : 0 dokumen dari 1 dokumen
Pemeliharaan Saluran Drainase di MM UGM dan di Desa Ngestiharjo, Kasihan, Bantul : 0 Lokasi dari 2 Lokasi
4.849.3 54.700
Layanan Sistem air limbah terpusat
Mempertahank an layanan sistem air limbah terpusat sebesar 27.400 SR
2.835.70 0.000
Pemeliharaan Jaringan Air Limbah : Pipa Jaringan Air Limbah : 234 km dari 234 km
Pemantauan & Pengendalian Kualitas Air Tanah di Jaringan : Kualitas Air Tanah dengan Kadar Coliform Max : 1.8 JPT/100 ml dari 50 JPT/100 ml
2.503.69 2.939
Pemantauan & Pengendalia n Kualitas Air Limbah Jaringan : Baku mutu Timbal (Pb) : 0 mg/lt dari 10 mg/lt
Pemantauan & Pengendalia n Kualitas Air Tanah di Jaringan : kualitas air tanah dengan kadar Coliform Max : 0
2.685.1 75.056
Pemantaua n & Pengendalia n Kualitas Air Limbah Jaringan : Baku mutu Timbal (Pb) : 0.23 mg/lt dari 10 mg/lt
Pemantaua n & Pengendalia n Kualitas Air Tanah di Jaringan : kualitas air tanah dengan kadar Coliform Max : 50
726.314 .500
Pemantauan & Pengendalian Kualitas Air Limbah Jaringan : Baku mutu Timbal (Pb) : 0.23 mg/lt dari 10 mg/lt
Pemantauan & Pengendalian Kualitas Air Tanah di Jaringan : kualitas air tanah dengan kadar Coliform Max : 50 JPT/100 ml dari 50 JPT/100 ml
3.230.0 07.439
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
23
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pemantauan dan Pengendalian Kualitas Air Limbah Jaringan : Baku Mutu Timbal (Pb) : 0.28 mg/lt dari 10 mg/lt
Tenaga Operasional Jaringan Air Limbah : 14 Orang dari 14 Orang
JPT/100 ml dari 50 JPT/100 ml
Pemeliharaa n jaringan air Limbah : pipa jaringan air limbah : 0 km dari 234 km
JPT/100 ml dari 50 JPT/100 ml
Pemeliharaa n jaringan air Limbah : pipa jaringan air limbah : 0 km dari 234 km
Pemeliharaan jaringan air Limbah : pipa jaringan air limbah : 0 km dari 234 km
Pemeliharaan Instalasi Pengolahan Air Limbah Domestik Terpusat (Sharing Pemda DIY dan Pemkab/Kota)
Layanan Sistem air limbah terpusat
Dukungan kegiatan Pemeliharaan Instalasi Pengolahan Air Limbah Sistem Terpusat (Sharing Pemda DIY dan PemKab/Kota) pada Layanan Sistem Air Limbah Terpusat di KPY dari 26.300 SR Menjadi 27.400 SR
2.000.00 0.000
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0 ppm dari 1.5 ppm
Tenaga Operasional Instalasi Air Limbah : 11 Orang dari 11 Orang
Tim teknis pelaksanan dan Pengarah : 34 Orang dari 51 Orang
Pemeliharaan Jalan Kawasan IPAL : 2 km dari 2 km
2.228.22 6.262
Pemeliharaa n Instalasi Pengolahan Air Limbah : : 0 unit dari 68 unit
Pemantauan dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0 ppm dari 1.5 ppm
Pemeliharaa n Jalan Kawasan IPAL : 0 km dari 2 km
Pemantauan dan Pengendalia n Unsur Dalam Sludge :
2.750.0 00.000
Pemeliharaa n Instalasi Pengolahan Air Limbah : : 0 unit dari 68 unit
Pemantaua n dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0.02 ppm dari 1.5 ppm
Pemeliharaa n Jalan Kawasan IPAL : 0 km dari 2 km
Pemantaua n dan Pengendalia n Unsur Dalam Sludge :
1.229.7 19.200
Pemeliharaan Instalasi Pengolahan Air Limbah : : 0 unit dari 68 unit
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi NH3 : 0.02 ppm dari 1.5 ppm
Pemeliharaan Jalan Kawasan IPAL : 0 km dari 2 km
Pemantauan dan Pengendalian Unsur Dalam Sludge : Unsur Dalam Sludge dengan kadar Timbal (Pb) :
3.457.9 45.462
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
24
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pemantauan dan Pengendalian Unsur Dalam Sludge : Unsur Dalam Sludge kadar Timbal (Pb) : 0.23 mg/lt dari 10 mg/lt
Pemantauan dan Pengendalian Kualitas Biota/Colifor m : Kualitas Biota dengan kondisi Coliform Max : 1.8 JPT/100ml dari 10000 JPT/100ml
Pemeliharaan Instalasi Pengolahan Air Limbah : 68 unit dari 68 unit
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi H2S : 0 ppm dari 0.01 ppm
Pemantauan dan Pengendalian Kualitas Air
Unsur Dalam Sludge dengan kadar Timbal (Pb) : 0 mg/lt dari 10 mg/lt
Pemantauan dan Pengendalia n Kualitas Biota/Colifor m : Kualitas Biota dengan kondisi Coliform Max : 0 JPT/100ml dari 10000 JPT/100ml
Belanja Modal Pengadaan Alat Laboratoriu m : 0 jenis dari 7 jenis
Belanja Modal Pengadaan Pompa Lumpur : 0 unit dari 1 unit
Pemantauan dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi H2S
Unsur Dalam Sludge dengan kadar Timbal (Pb) : 0.02 mg/lt dari 10 mg/lt
Pemantaua n dan Pengendalia n Kualitas Biota/Colifor m : Kualitas Biota dengan kondisi Coliform Max : 1.8 JPT/100ml dari 10000 JPT/100ml
Belanja Modal Pengadaan Alat Laboratoriu m : 7 jenis dari 7 jenis
Belanja Modal Pengadaan Pompa Lumpur : 1 unit dari 1 unit
Pemantaua n dan Pengendalia n Kualitas Udara : Kualitas Udara dengan kondisi H2S
0.02 mg/lt dari 10 mg/lt
Pemantauan dan Pengendalian Kualitas Biota/Coliform : Kualitas Biota dengan kondisi Coliform Max : 1.8 JPT/100ml dari 10000 JPT/100ml
Belanja Modal Pengadaan Alat Laboratorium : 7 jenis dari 7 jenis
Belanja Modal Pengadaan Pompa Lumpur : 1 unit dari 1 unit
Pemantauan dan Pengendalian Kualitas Udara : Kualitas Udara dengan kondisi H2S max : 0.01 ppm dari 10 ppm
Belanja Modal Pengadaan motor listrik pada kompresor vacum pump : 0 unit dari 1 unit
Pemantauan dan
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
25
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Masuk/Keluar IPAL : Ambang Batas BOD Max : 9.1 mg/ltr dari 75 mg/ltr
max : 0 ppm dari 10 ppm
Belanja Modal Pengadaan motor listrik pada kompresor vacum pump : 0 unit dari 1 unit
Pemantauan dan Pengendalia n Kualitas Air Masuk/Kelu ar IPAL : Kualitas Air dengan BOD Max : 0 mg/ltr dari 75 mg/ltr
max : 0.01 ppm dari 10 ppm
Belanja Modal Pengadaan motor listrik pada kompresor vacum pump : 0 unit dari 1 unit
Pemantaua n dan Pengendalia n Kualitas Air Masuk/Kelu ar IPAL : Kualitas Air dengan BOD Max : 5.1 mg/ltr dari 75mg/ltr
Pengendalian Kualitas Air Masuk/Keluar IPAL : Kualitas Air dengan BOD Max : 5.1 mg/ltr dari 75 mg/ltr
Pemeliharaan Instalasi Pengolahan Lumpur Tinja
Layanan Sistem air limbah terpusat
Mempertahank an layanan pengolahan air limbah terpusat dan lumpur tinja (IPLT) sebesar 100 m3/hari
1.452.00 0.000
Pemantauan dan Pengendalian Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6- 9 : 6.5 PH dari 9 PH
Pengendalian Kualitas Air Masuk/Keluar IPLT : Kualitas Air limbah dengan BOD Max : 61.2
896.425. 117
Pemeliharaa n Instalasi Pengolah Lumpur Tinja : 0 Instalasi dari 1 Instalasi
Pemeliharaa n APLT (kap. 100M3/hari) : Instalasi APLT : 0 unit dari 1 unit
Pemantauan dan Pengendalia n Kualitas
1.655.0 28.480
Pemeliharaa n Instalasi Pengolah Lumpur Tinja : 1 Instalasi dari 1 Instalasi
Pemeliharaa n APLT (kap. 100M3/hari) : Instalasi APLT : 1 unit dari 1 unit
Pemantaua n dan Pengendalia n Kualitas
1.122.9 00.400
Pemeliharaan Instalasi Pengolah Lumpur Tinja : 1 Instalasi dari 1 Instalasi
Pemeliharaan APLT (kap. 100M3/hari) : Instalasi APLT : 1 unit dari 1 unit
Pemantauan dan Pengendalian Kualitas Air Masuk/Keluar IPLT : Kualitas Air limbah
2.019.3 25.517
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
26
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
mg/ltr dari 75 mg/ltr
Pemeliharaan Instalasi Pengolah Lumpur Tinja : 1 unit dari 1 unit
Air Masuk/Kelu ar IPLT : Kualitas Air limbah dengan BOD Max : 0 mg/lt dari 75 mg/lt
Pemantauan dan Pengendalia n Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6-9 : 0 PH dari 9 PH
Air Masuk/Kelu ar IPLT : Kualitas Air limbah dengan BOD Max : 4.6 mg/lt dari 75 mg/lt
Pemantaua n dan Pengendalia n Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6-9 : 6.8 PH dari 9 PH
dengan BOD Max : 4.6 mg/lt dari 75 mg/lt
Pemantauan dan Pengendalian Kualitas Lumpur Tinja dari Truck tangki : kualitas lumpur tinja dengan PH 6-9 : 6.8 PH dari 9 PH
Penyediaan Prasarana dan Sarana Sistem Pengelolaan Air Limbah Domestik Terpusat
Layanan Sistem air limbah terpusat
Dukungan Penambahan Layanan Jaringan Air Limbah Terpusat di KPY
2.811.50 0.000
Penyusunan Dokumen Perencanaan Pengembang an Jaringan Air Limbah Terpusat : 1 dokumen dari 1 dokumen
192.655. 500
N/A N/A N/A N/A Penyusunan Dokumen Perencanaan Pengembanga n Jaringan Air Limbah Terpusat : 1 dokumen dari 1 dokumen
192.655 .500
Bidang Cipta Karya
Rehabilitasi jaringan air limbah terpusat : Barek : 300 meter dari 300 meter
Rehabilitasi jaringan air limbah terpusat : Giwangan : 1.5 km dari 1.5 km
6.674.50 8.705
N/A N/A N/A N/A Rehabilitasi jaringan air limbah terpusat : Barek : 300 meter dari 300 meter
Rehabilitasi jaringan air limbah terpusat : Giwangan : 1.5 km dari 1.5 km
6.674.5 08.705
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
27
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pengembangan Sarana Prasarana Penanganan Sampah
Penanganan sampah sistem regional
Peningkatan sampah yang dikelola di TPST Regional menjadi sebesar 780 ton/hari
25.099.2 00.000
Pembanguna n tanggul penahan dinding TPST Piyungan : 40 meter dari 40 meter
Perencanaan DED tanggul penahan dinding lanjutan, drainase, dan jalan operasional di TPA Piyungan : 1 Dokumen dari 1 Dokumen
2.847.90 7.300
Pekerjaan tanggul penahan dinding lanjutan 2019, drainase, saluran lindi dan jalan di TPA Piyungan : 0 Meter dari 450 Meter
14.000. 000.000
Pekerjaan tanggul penahan dinding lanjutan 2019, drainase, saluran lindi dan jalan di TPA Piyungan : 0 Meter dari 450 Meter
0 Pekerjaan tanggul penahan dinding lanjutan 2019, drainase, saluran lindi dan jalan di TPA Piyungan : 0 Meter dari 450 Meter
0
0
PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Pengelolaan Air Curah pada SPAM Regional
1.150 liter/ detik
24,35 4,43 Balai PIALAMP
110.074 meter 64.000.0 00.000
91.447 meter 3.406.93 1.000
91.174 meter 4.108.9 28.000
91.447 meter 153.186 .660
91.447 meter 153.186 .660
Pengelolaan Air Curah pada SPAM Regional
Meningkatkan ketersediaan air curah dari 700 lt/dtk menjadi 1000 Lt/Detik
65.000.0 00.000
Belanja Jasa Konsultasi Perencanaan Dokumen Business Plan : 1 Dokumen dari 1 Dokumen
Operasi dan Pemeliharaan Prasedimenta si, Reservoir
6.734.78 1.905
Pemeliharaa n Alat-alat Laboratoriu m : 0 jenis dari 20 jenis
6.618.4 55.000
Pemeliharaa n Alat-alat Laboratoriu m : 20 jenis dari 20 jenis
2.882.6 11.450
Pemeliharaan Alat-alat Laboratorium : 20 jenis dari 20 jenis
Pemeliharaan Intake dan
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
28
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
dan Boster : 7 unit dari 7 unit
Operasi dan Pemeliharaan IPA : 2 unit dari 2 unit
Operasional SPAM Regional : Tenaga Operasional SPAM : 25 Orang dari 28 Orang
Operasi dan Pemeliharaan Jaringan PIPA : 40 km dari 40 km
Operasi dan Pemeliharaan Clearwell : 1 unit dari 1 unit
Operasi dan Pemeliharaan Intake dan Kantor : 2 unit dari 2 unit
Belanja Jasa Tenaga Ahli : 2 Orang dari 2 Orang
Pemeliharaa n Intake dan Kantor : 0 unit dari 2 unit
Pemeliharaa n Prasediment asi : 0 unit dari 1 unit
Pemeliharaa n Reservoir dan Boster : 0 unit dari 10 unit
Pemeliharaa n Jaringan PIPA : 0 km dari 63 km
Pemeliharaa n Intake dan Kantor : 1 unit dari 2 unit
Pemeliharaa n Prasediment asi : 1 unit dari 1 unit
Pemeliharaa n Reservoir dan Boster : 0 unit dari 10 unit
Pemeliharaa n Jaringan PIPA : 30.66 km dari 63 km
Kantor : 1 unit dari 2 unit
Pemeliharaan Prasedimentas i : 1 unit dari 1 unit
Pemeliharaan Reservoir dan Boster : 0 unit dari 10 unit
Pemeliharaan Jaringan PIPA : 30.66 km dari 63 km
Pengembangan Sistem Penyediaan Air Minum
Panjang jaringan distribusi SPAM regional
1.Penambahan penduduk berakses air minum
64.000.0 00.000
Tersedianya bahan bangunan untuk pengembang an sistem penyediaan air minum pada
3.406.93 1.000
Penyusunan Masterplan dan DED pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
4.108.9 28.000
Penyusunan Masterplan dan DED pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
153.186 .660
Penyusunan Masterplan dan DED pengembanga n SPAM Banyusoco : 0 dokumen dari 1 dokumen
3.560.1 17.660
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
29
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
kelompok SPAMDES : 26 kelompok dari 26 kelompok
Jasa konsultansi Sistem Pengelolaan Jaringan Air Bersih SPAM Regional Kartamantul Berbasis GIS dan Geotagging : 1 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dan Inverter : 0 unit dari 2 unit
Tersedianya Belanja Modal Alat Laboratoriu m Kimia : 0 unit dari 4 unit
Tersedianya Belanja Modal Locator Detektor Pipa : 0 unit dari 1 unit
Tersedianya bahan bangunan untuk pengemban gan sistem penyediaan air minum pada kelompok SPAMDES : 0 Kelompok dari 25 Kelompok
Apraisal tanah untuk PDAB : 0 dokumen dari 1 dokumen
Tersedianya Belanja
Tersedianya Belanja Modal Pengadaan Pompa dan Inverter : 0 unit dari 2 unit
Tersedianya Belanja Modal Alat Laboratoriu m Kimia : 0 unit dari 4 unit
Tersedianya Belanja Modal Locator Detektor Pipa : 0 unit dari 1 unit
Tersedianya bahan bangunan untuk pengemban gan sistem penyediaan air minum pada kelompok SPAMDES : 0 Kelompok dari 25 Kelompok
Apraisal tanah untuk PDAB : 0 dokumen dari 1 dokumen
Tersedianya Belanja
Tersedianya Belanja Modal Pengadaan Pompa dan Inverter : 0 unit dari 2 unit
Tersedianya Belanja Modal Alat Laboratorium Kimia : 0 unit dari 4 unit
Tersedianya Belanja Modal Locator Detektor Pipa : 0 unit dari 1 unit
Tersedianya bahan bangunan untuk pengembanga n sistem penyediaan air minum pada kelompok SPAMDES : 0 Kelompok dari 25 Kelompok
Apraisal tanah untuk PDAB : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Bangunan Bak Injeksi Kaporit : 0 unit dari 1 unit
Penyusunan FS
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
30
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Modal Pengadaan Bangunan Bak Injeksi Kaporit : 0 unit dari 1 unit
Penyusunan FS pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dozing : 0 unit dari 2 unit
Pembangun an Jalan akses Reservoir Guwo : 0 Meter dari 90 Meter
Tersedianya Belanja Modal Pengadaan Alat Ukur (Watermeter Digital) : 0 unit dari 3 unit
Modal Pengadaan Bangunan Bak Injeksi Kaporit : 0 unit dari 1 unit
Penyusunan FS pengemban gan SPAM Banyusoco : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dozing : 0 unit dari 2 unit
Pembangun an Jalan akses Reservoir Guwo : 0 Meter dari 90 Meter
Tersedianya Belanja Modal Pengadaan Alat Ukur (Watermeter Digital) : 0 unit dari 3 unit
pengembanga n SPAM Banyusoco : 0 dokumen dari 1 dokumen
Tersedianya Belanja Modal Pengadaan Pompa dozing : 0 unit dari 2 unit
Pembangunan Jalan akses Reservoir Guwo : 0 Meter dari 90 Meter
Tersedianya Belanja Modal Pengadaan Alat Ukur (Watermeter Digital) : 0 unit dari 3 unit
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
31
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
4 Meningkatnya luas fungsional daerah irigasi yang terlayani air irigasi
PROGRAM PENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI
Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
77,20% 34.219.4 06.250
72,31% 3.283.81 8.500
74,50% 363.470 .000
72,31% 71.730. 000
72,31% 71.730. 000
Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
87,00% 39.616.4 06.000
73,48% 11.889.6 99.728
77,82% 10.527. 545.500
73,48% 2.524.5 98.969
73,48% 2.524.5 98.969
Rerata hasil penilaian kondisi fisik prasarana jaringan irigasi pada seluruh daerah irigasi kewenangan pemda DIY
Peningkatan Jaringan Irigasi sebesar 52.250 m
76.719.3 98.150
Detail Engineering Design D.I. Blawong : 1 dokumen dari 1 dokumen
Detail Engineering Design D.I. Sapon : 1 dokumen dari 1 dokumen
Peningkatan Jaringan Irigasi D.I. Kucir : 350 meter dari 350 meter
Peningkatan Jaringan Irigasi D.I. Kuton : 350 meter dari 350 meter
Detail Engineering Design D.I. Pijenan/Kamij
3.283.81 8.500
Updating Pengeloaan Aset Irigasi (PAI) dan AKNPI 41 Daerah Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul : 0 dokumen dari 1 dokumen
363.470 .000
Updating Pengeloaan Aset Irigasi (PAI) dan AKNPI 41 Daerah Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul : 0 dokumen dari 1 dokumen
71.730. 000
Updating Pengeloaan Aset Irigasi (PAI) dan AKNPI 41 Daerah Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
DED Jaringan Irigasi Sumur Pompa Pampang, Gunungkidul : 0 dokumen dari 1 dokumen
3.355.5 48.500
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
32
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
oro : 1 dokumen dari 1 dokumen
Peningkatan Jaringan Irigasi D.I. Ponggok : 400 meter dari 400 meter
Penilaian Kondisi Fisik Jaringan Irigasi : 1 dokumen dari 1 dokumen
Detail Engineering Design D.I. Pendowo : 1 dokumen dari 1 dokumen
Pengelolaan Jaringan Irigasi
Rerata hasil penilaian Kinerja Daerah Irigasi pada seluruh daerah irigasi kewenangan Pemda DIY
Dipertahankan nya kinerja 41 DI sebesar 82,41%
39.616.4 06.000
Operasional Komisi Irigasi DIY & Operasional Sekretariat : 1 kegiatan dari 1 kegiatan
Koordinasi Tata Pengaturan SDA (Masyarakat
11.889.6 99.728
Koordinasi Tata Pengaturan SDA (Masyarakat P3A/GP3A/I P3A) : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengamana n & Pengendalia n Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Berkala
10.527. 545.50 0
Koordinasi Tata Pengaturan SDA (Masyarakat P3A/GP3A/I P3A) : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengamana n & Pengendalia n Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Berkala
2.524.5 98.969
Koordinasi Tata Pengaturan SDA (Masyarakat P3A/GP3A/IP3 A) : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengamanan & Pengendalian Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaan Berkala Jaringan Irigasi : 0 Daerah Irigasi
14.414. 298.697
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
33
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
P3A/GP3A/IP 3A : 41 DI dari 41 DI
Pengamanan & Pengendalian Jaringan Irigasi : 41 DI dari 41 DI
Pemeliharaan Berkala Sempadan & Jalan Inspeksi Jaringan Irigasi : 6 DI dari 6 DI
Pemeliharaan Rutin Jaringan Irigasi : 41 DI dari 41 DI
Operasi Jaringan Irigasi : 41 DI dari 41 DI
Jaringan Irigasi : 0 Daerah Irigasi dari 8 Daerah Irigasi
Operasi Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Rutin Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Rekomenda si kebijakan pengelolaan irigasi di DIY melalui Komisi Irigasi : 0 dokumen dari 1 dokumen
Jaringan Irigasi : 0 Daerah Irigasi dari 8 Daerah Irigasi
Operasi Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaa n Rutin Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Rekomenda si kebijakan pengelolaan irigasi di DIY melalui Komisi Irigasi : 0 dokumen dari 1 dokumen
dari 8 Daerah Irigasi
Operasi Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pemeliharaan Rutin Jaringan Irigasi : 0 Daerah Irigasi dari 41 Daerah Irigasi
Pengembangan Jaringan Irigasi (D A K)
N/A N/A Rehabilitasi Jaringan Irigasi D.I. Simo : 700 meter dari 700 meter
Rehabilitasi Jaringan Irigasi D.I. Blawong : 350 meter dari 350 meter
4.168.42 7.800
Rehabilitasi Jaringan Irigasi D.I. Pijenan/Kam ijoro Saluan Pembawa : 0 Meter dari 350 Meter
Tersusunny a Rencana Kerja 2021, Rapat Koordinasi
5.764.8 80.000
Rehabilitasi Jaringan Irigasi D.I. Pijenan/Ka mijoro Saluan Pembawa : 0 Meter dari 350 Meter
Tersusunny a Rencana Kerja 2021, Rapat
0 Rehabilitasi Jaringan Irigasi D.I. Pijenan/Kamijo ro Saluan Pembawa : 0 Meter dari 350 Meter
Tersusunnya Rencana Kerja 2021, Rapat Koordinasi Persiapan
4.168.4 27.800
Bidang SDAD
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
34
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Dokumen Laporan E- monitoring Triwulan : 4 dokumen dari 4 dokumen
Perencanaan DED DAK 2020 : 1 dokumen dari 1 dokumen
Persiapan Rencana Kerja : 0 dokumen dari 1 dokumen
Koordinasi Persiapan Rencana Kerja : 0 dokumen dari 1 dokumen
Rencana Kerja : 0 dokumen dari 1 dokumen
PROGRAM PENGELOLAAN DAN PENGEMBANGAN AIR BAKU
Penyediaan Air Baku
403,86 liter/ detik
0 liter/detik 81.559. 000
0 liter/detik 7.978.3 98.954
0,00 27,73 Bidang SDAD
54,31 liter/ detik
64,65 37,79 Bidang SDAD
Penyediaan Air Baku
28.773.8 00.000
Pembanguna n Embung Sendangtirto Berbah Sleman : 0 paket dari 1 paket
Penyusunan DED Long Storage Hargomulyo, Gedangsari, Gunungkidul : 1 dokumen dari 1 dokumen
Penyusunan FS Embung Bakulan Trirenggo Bantul : 1 dokumen dari 1 dokumen
Operasional Sekretriat
7.896.83 9.954
Rekomendasi kebijakan sumber daya air melalui Dewan SDA : 0 dokumen dari 1 dokumen
303.924 .000
Rekomenda si kebijakan sumber daya air melalui Dewan SDA : 0 dokumen dari 1 dokumen
81.559. 000
Rekomendasi kebijakan sumber daya air melalui Dewan SDA : 0 dokumen dari 1 dokumen
7.978.3 98.954
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
35
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Dewan Sumber Daya Air DIY : 1 dokumen dari 1 dokumen
Penyusunan DED Broncupturin g Panggang, Panggang, Gunungkidul : 1 dokumen dari 1 dokumen
Penyusunan FS Embung Triwidadi Pajangan Bantul : 1 dokumen dari 1 dokumen
Penilaian kelayakan potensi sumber air baku : 1 dokumen dari 1 dokumen
Penyusunan FS Embung Minggir, Sleman : 1 dokumen dari 1 dokumen
Penyusunan DED Embung Ngreco, Pundong, Bantul : 1 dokumen dari 1 dokumen
Pembanguna n Embung Jeruk Wudel,
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
36
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Girisubo, Gunungkidul : 1 paket dari 1 paket
Pelaksanaan sistem manajemen mutu : 1 kegiatan dari 1 kegiatan
Pengelolaan Air Baku
Pengelolaan Air Baku
Mempertahank an suply air baku di DIY sebesar 76,95 ltr/det
29.359.8 00.000
Pemeliharaan Berkala Embung/Tela ga : 7 embung dari 7 embung
Operasi & Pemeliharaan Pos Hidrologi : 69 pos hidrologi dari 69 pos hidrologi
Pelaksanaan SIH3 : 1 kegiatan dari 1 kegiatan
Pengelolaan Data SDA : 1 sistem dari 1 sistem
Kampanye Pengelolaan SDA : 6 kegiatan dari 6 kegiatan
Pengadaan Pos AWLR : 1 paket dari 1
9.900.90 1.779
Pemeliharaa n Rutin Embung/Tel aga : 0 Embung dari 24 Embung
Pengelolaan Web dan Data SISDA : 0 Sistem / Aplikasi dari 1 Sistem / Aplikasi
Kampanye Pengelolaan SDA : 0 Kegiatan dari 3 Kegiatan
Operasi & Pemeliharaa n Pos Hidrologi : 0 Pos Hidrologi dari 64 Pos Hidrologi
2.794.9 22.400
Pemeliharaa n Rutin Embung/Tel aga : 0 Embung dari 24 Embung
Pengelolaan Web dan Data SISDA : 0 Sistem / Aplikasi dari 1 Sistem / Aplikasi
Kampanye Pengelolaan SDA : 0 Kegiatan dari 3 Kegiatan
Operasi & Pemeliharaa n Pos Hidrologi : 0 Pos Hidrologi dari 64 Pos Hidrologi
1.193.3 35.187
Pemeliharaan Rutin Embung/Telag a : 0 Embung dari 24 Embung
Pengelolaan Web dan Data SISDA : 0 Sistem / Aplikasi dari 1 Sistem / Aplikasi
Kampanye Pengelolaan SDA : 0 Kegiatan dari 3 Kegiatan
Operasi & Pemeliharaan Pos Hidrologi : 0 Pos Hidrologi dari 64 Pos Hidrologi
11.094. 236.966
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
37
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
paket
Pemeliharaan Rutin Embung/Tela ga : 24 embung dari 24 embung
Pengecatan Pos Hidrologi : 29 pos hidrologi dari 30 pos hidrologi
Pengadaan Lampu Penerangan Embung/Sola r sell : 7 unit dari 7 unit
Pengadaan Alat Hidrologi : 4 jenis dari 4 jenis
5 Meningkatnya aksesibilitas wilayah
PROGRAM PENYELENGGA RAAN JALAN
75,26% 167.293. 565.320
73,48% 87.093.2 55.370
74,06% 32.280. 490.000
73,48% 8.748.2 57.286
73,48% 95.841. 512.656
Penambahan Jaringan Jalan Baru
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
38
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Peningkatan/Rehabi litasi Jalan dan Jembatan
Jaringan jalan provinsi dalam kondisi mantap
Peningkatan 17,20 Km jaringan jalan dari kondisi rusak ringan dan berat menjadi kondisi baik dan sedang
144.915. 110.860
Peningkatan Ruas Jalan Brosot-Toyan Sepanjang 2 Km : 100 % dari 100 %
Peningkatan Jembatan Denggung Sepanjang 18,5 Km : 100 % dari 100 %
Peningkatan Ruas Jalan Tegalsari - Klepu Sepanjang 3 Km : 100 % dari 100 %
Peningkatan Ruas Jalan Imogiri - Mangunan (Dodogan) Sepanjang 2,5 Km : 100 % dari 100 %
Peningkatan Jembatan Tambakrejo Sepanjang 6,00 m : 100 % dari 100 %
Peningkatan Ruas Jalan Besi - Jangkang -
70.829.7 99.050
Perencanaa n Peningkatan Jalan Patuk- Terong, Bantul : 0 Dokumen dari 1 Dokumen
Peningkatan Jalan Semin- Blimbing, Gunungkidul : 0 KM dari 2 KM
Perencanaa n Peningkatan Jalan Nglipar - Semin, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Hargomulyo -Watugajah, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Sambipitu- Nglipar- Semin, Gunungkidul : 0 Dokumen dari 1
12.894. 852.000
Perencanaa n Peningkatan Jalan Patuk- Terong, Bantul : 1 Dokumen dari 1 Dokumen
Peningkatan Jalan Semin- Blimbing, Gunungkidul : 0 KM dari 2 KM
Perencanaa n Peningkatan Jalan Nglipar - Semin, Gunungkidul : 1 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Hargomulyo -Watugajah, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Sambipitu- Nglipar- Semin, Gunungkidul
121.655 .900
Perencanaan Peningkatan Jalan Patuk- Terong, Bantul : 1 Dokumen dari 1 Dokumen
Peningkatan Jalan Semin- Blimbing, Gunungkidul : 0 KM dari 2 KM
Perencanaan Peningkatan Jalan Nglipar - Semin, Gunungkidul : 1 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Hargomulyo- Watugajah, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Peningkatan Jalan Sambipitu- Nglipar-Semin, Gunungkidul : 0 Dokumen dari 1 Dokumen
DED Jembatan Gedangan, Gunungkidul : 0 Dokumen
70.951. 454.950
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
39
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Koroulon Sepanjang 2,50 Km : 100 % dari 100 %
Peningkatan Ruas Jalan Sampakan - Singosaren Sepanjang 2 Km : 100 % dari 100 %
Dokumen
: 0 Dokumen dari 1 Dokumen
DED Jembatan Gedangan, Gunungkidul : 0 Dokumen dari 1 Dokumen
dari 1 Dokumen
Jaringan jalan provinsi dalam kondisi mantap
760,45 km 5.740,96 m 1 dokumen 1 dokumen
22.378.4 54.460
Pemeliharaan Rutin Jembatan : 100 % dari 100 %
Pemeliharaan Rutin Jalan : 100 % dari 100 %
16.263.4 56.320
Tersedianya Dokumen Inspeksi Kondisi Jalan : 0 dokumen dari 1 dokumen
Tersedianya Dokumen Inspeksi Kondisi Jembatan : 0 dokumen dari 1 dokumen
Terpeliharan ya Jembatan Provinsi (246 buah jembatan) : 0 M dari 5727.8 M
Terpeliharan ya Jalan Provinsi (92 ruas jalan) : 0 Km dari 731.7 Km
19.385. 638.000
Tersedianya Dokumen Inspeksi Kondisi Jalan : 0 dokumen dari 1 dokumen
Tersedianya Dokumen Inspeksi Kondisi Jembatan : 0 dokumen dari 1 dokumen
Terpeliharan ya Jembatan Provinsi (246 buah jembatan) : 3264 M dari 5727.8 M
Terpeliharan ya Jalan Provinsi (92 ruas jalan) : 417 Km dari 731.7 Km
8.626.6 01.386
Tersedianya Dokumen Inspeksi Kondisi Jalan : 0 dokumen dari 1 dokumen
Tersedianya Dokumen Inspeksi Kondisi Jembatan : 0 dokumen dari 1 dokumen
Terpeliharanya Jembatan Provinsi (246 buah jembatan) : 3264 M dari 5727.8 M
Terpeliharanya Jalan Provinsi (92 ruas jalan) : 417 Km dari 731.7 Km
24.890. 057.706
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
40
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pembangunan Jalan dan Jembatan
Penambahan Jaringan Jalan Baru
Tersedianya satu akses baru kawasan Wisata Prambanan dan Ratu Boko menuju Kawasan Gunung Api Purba Nglanggeran dan Kawasan Bentang Karst
91.032.0 00.000
Studi Pengembang an Jaringan Jalan di DIY : 1 dokumen dari 1 dokumen
Pembanguna n Jembatan Tlacap sepanjang 14 m : 100 % dari 100 %
Kajian Pembanguna n Jembatan Kebosungu : 1 dokumen dari 1 dokumen
Kajian Pembanguna n Jalan Gejawan- Balecatur : 1 dokumen dari 1 dokumen
4.821.72 5.800
N/A
N/A
N/A
N/A
Studi Pengembanga n Jaringan Jalan di DIY : 1 dokumen dari 1 dokumen
Pembangunan Jembatan Tlacap sepanjang 14 m : 100 % dari 100 %
Kajian Pembangunan Jembatan Kebosungu : 1 dokumen dari 1 dokumen
Kajian Pembangunan Jalan Gejawan- Balecatur : 1 dokumen dari 1 dokumen
4.821.7 25.800
Bidang Bina Marga
Peningkatan Jalan (DAK)
N/A N/A Peningkatan Ruas Jalan Klangon - Tempel (DAK) sepanjang 3,5 Km : 100 % dari 100 %
Pelaporan e- monitoring Peningkatan Jalan (DAK) : 2 dokumen dari 2 dokumen
Peningkatan
32.602.4 01.800
Tersusunny a Rencana Kerja 2021, Rapat Koordinasi Persiapan Rencana Kerja : 0 Dokumen dari 1 Dokumen
Peningkatan Ruas Jalan Brosot- Toyan (DAK) : 0
0 Tersusunny a Rencana Kerja 2021, Rapat Koordinasi Persiapan Rencana Kerja : 0 Dokumen dari 1 Dokumen
Peningkatan Ruas Jalan Brosot- Toyan (DAK) : 0
0 N/A N/A Bidang Bina Marga
Perubahan Renja – 2020
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
41
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Ruas Jalan Brosot-Toyan (DAK) Sepanjang 3 Km : 100 % dari 100 %
KM dari 3 KM
Peningkatan Ruas Jalan Denggung- Wonorejo (DAK) : 0 KM dari 2.5 KM
Tersedianya Data Survei Kondisi Jalan Tahun 2020 : 0 Dokumen dari 1 Dokumen
Tersedianya Data Survei Kondisi Jembatan Tahun 2020 : 0 Dokumen dari 1 Dokumen
KM dari 3 KM
Peningkatan Ruas Jalan Denggung- Wonorejo (DAK) : 0 KM dari 2.5 KM
Tersedianya Data Survei Kondisi Jalan Tahun 2020 : 0 Dokumen dari 1 Dokumen
Tersedianya Data Survei Kondisi Jembatan Tahun 2020 : 0 Dokumen dari 1 Dokumen
Pensertifikatan Tanah Jalan Provinsi
Penambahan Jaringan Jalan Baru
Tersedianya data informasi dan perkembangan Jalan Provinsi sebanyak 1 Ruas
168.000. 000
924.468. 680
486.700 .000
175.124 .520
1.099.5 93.200
PROGRAM PELAYANAN JASA PENGUJIAN DAN PEMBINAAN JASA KONSTRUKSI
Peningkatan kinerja tenaga konstruksi dan masyarakat jasa konstruksi
99,14% 2.371.84 2.000
64,12% 1.207.18 6.400
75,13% 428.535 .500
67,78% 126.518 .000
67,78% 1.333.7 04.400
800 LHU 4.683.05 9.900
1286 LHU 1.075.37 0.697
800 LHU 611.526 .900
167 LHU 114.321 .340
167 LHU 1.189.6 92.037
20,875 25,40 Balai PJK
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
42
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Pembinaan Tenaga Kerja Konstruksi dan Layanan Informasi Jasa Konstruksi
Peningkatan kinerja tenaga konstruksi dan masyarakat jasa konstruksi
penambahan sejumlah 300 orang tenaga ahli konstruksi bersertifikat dan 3000 orang masyarakat terlayani informasi jasa konstruksi
2.371.842.0 00
Penyebaran informasi dan pameran teknologi ke- PU-an melalui Klinik Konstruksi : 1 Laporan dari 1 Laporan
Inventarisasi data penyelenggar aan konstruksi : 1 Laporan dari 1 Laporan
Peningkatan kualitas jasa konstruksi melalui pembinaan jasa konstruksi : 190 Orang dari 190 Orang
Penyusunan informasi harga satuan bahan bangunan : 12 Laporan dari 12 Laporan
Pengelolaan aplikasi sistem informasi jasa konstruksi : 1 Laporan dari 1 Laporan
Fasilitasi sertifikasi Tenaga Ahli
1.207.18 6.400
Pengelolaan Aplikasi Sistem Informasi Jasa Konstruksi : 0 Laporan dari 1 Laporan
Penyebaran Informasi dan Pameran Teknologi ke-PU-an : 0 Laporan dari 1 Laporan
Inventarisasi Data Penyelengg araan Konstruksi : 0 Laporan dari 1 Laporan
Pendamping an Masyarakat Melalui Klinik Konstruksi : 0 Orang dari 40 Orang
Fasilitasi Sertifikasi Tenaga Ahli Konstruksi : 0 Orang dari 30 Orang
Pembinaan Jasa Konstruksi : 0 Orang dari 40 Orang
428.535 .500
Pengelolaan Aplikasi Sistem Informasi Jasa Konstruksi : 0 Laporan dari 1 Laporan
Penyebaran Informasi dan Pameran Teknologi ke-PU-an : 0 Laporan dari 1 Laporan
Inventarisasi Data Penyelengg araan Konstruksi : 0 Laporan dari 1 Laporan
Pendamping an Masyarakat Melalui Klinik Konstruksi : 40 Orang dari 40 Orang
Fasilitasi Sertifikasi Tenaga Ahli Konstruksi : 30 Orang dari 30 Orang
Pembinaan Jasa Konstruksi :
126.518 .000
Pengelolaan Aplikasi Sistem Informasi Jasa Konstruksi : 0 Laporan dari 1 Laporan
Penyebaran Informasi dan Pameran Teknologi ke- PU-an : 0 Laporan dari 1 Laporan
Inventarisasi Data Penyelenggara an Konstruksi : 0 Laporan dari 1 Laporan
Pendampingan Masyarakat Melalui Klinik Konstruksi : 40 Orang dari 40 Orang
Fasilitasi Sertifikasi Tenaga Ahli Konstruksi : 30 Orang dari 30 Orang
Pembinaan Jasa Konstruksi : 40 Orang dari 40 Orang
Penyusunan Informasi Teknis Bahan Bangunan : 6 Laporan dari 12 Laporan
1.333.7 04.400
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
43
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
konstruksi : 300 Orang dari 300 Orang
Pendampinga n masyarakat melalui Klinik Konstruksi : 120 Orang dari 120 Orang
Penyusunan Informasi Teknis Bahan Bangunan : 0 Laporan dari 12 Laporan
40 Orang dari 40 Orang
Penyusunan Informasi Teknis Bahan Bangunan : 6 Laporan dari 12 Laporan
Pelayanan Jasa Pengujian Kontruksi
Jumlah sertifikat/ Laporan Hasil Uji yang diterbitkan sebanyak 800 LHU
4.683.059.9 00
Pengujian Kualitas Pengujian Tanah Batuan dan Bahan Bangunan : 1286 LHU dari 800 LHU
1.075.37 0.697
Pemeliharaa n Alat : 0 jenis dari 20 jenis
Pengujian Kualitas Mutu Tanah, Batuan, dan Kualitas Bahan Bangunan : 0 LHU dari 800 LHU
Pengadaan AlatLaborato rium Fisika : 0 jenis dari 20 jenis
Pengadaan Peralatan/P erlengkapan : 0 jenis dari 98 jenis
Peningkatan Kualitas Laboratoriu m : 0 parameter dari 3 parameter
611.526 .900
Pemeliharaa n Alat : 0 jenis dari 20 jenis
Pengujian Kualitas Mutu Tanah, Batuan, dan Kualitas Bahan Bangunan : 167 LHU dari 800LHU
Pengadaan AlatLaborat orium Fisika : 0 jenis dari 20 jenis
Pengadaan Peralatan/P erlengkapan : 0 jenis dari 98 jenis
Peningkatan Kualitas Laboratoriu m : 0 parameter dari 3 parameter
114.321 .340
Kalibrasi Alat : 0 jenis dari 58 jenis
Pemeliharaan Alat : 0 jenis dari 20 jenis
Pengujian Kualitas Mutu Tanah, Batuan, dan Kualitas Bahan Bangunan : 167 LHU dari 800 LHU
Pengadaan Alat Laboratorium Fisika : 0 jenis dari 20 jenis
Pengadaan Peralatan/Perl engkapan : 0 jenis dari 98 jenis
Peningkatan Kualitas Laboratorium : 0 parameter dari 3 parameter
1.189.6 92.037
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
44
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
7 Penduduk dengan hunian yang layak
PROGRAM PENYELENGGARA AN PERUMAHAN
53,78% 65.884.5 00.000
38,86% 44.464.2 44.911
32,43% 8.319.9 40.380
38,86% 1.285.1 40.430
38,86% 45.749. 385.341
20% 15.000.0 00.000
8,91% 986.940. 500
12% 311.548 .000
8,91% 5.243.0 00
8,91% 992.183 .500
68,94% 82,497 Bidang Perumahan
Cakupan penanganan kawasan kumuh
10.000.0 00.000
Penanganan PSU Permukiman Kumuh Kec. Pengasih, Kab. Kulon Progo : 16 lokasi dari 16 lokasi
Penanganan PSU Permukiman Kumuh di Kel. Notoprajan Kec. Ngampilan, Kel. Ngampilan Kec. Ngampilan dan Kel. Prawirodirjan, Kec. Gondomana Kota Yogyakarta. : 13.51 hektar dari 13.51 hektar
8.249.65 5.459
- - - - Penanganan PSU Permukiman Kumuh Kec. Pengasih, Kab. Kulon Progo : 16 lokasi dari 16 lokasi
Penanganan PSU Permukiman Kumuh di Kel. Notoprajan Kec. Ngampilan, Kel. Ngampilan Kec. Ngampilan dan Kel. Prawirodirjan, Kec. Gondomana Kota Yogyakarta. : 13.51 hektar dari 13.51 hektar
8.249.6 55.459
Dinas Pekerjaan Umum Perumahan dan Energi Sumber Daya Mineral DIY
45
Perubahan Renstra DPUPESDM DIY)
Renja Tahun 2019
DPUPESDM DIY Berjalan yang dievaluasi Tahun
2020
2020
Anggaran Renstra DPUP-ESDM DIY
jawab
K Rp K Rp K Rp K Rp K Rp K Rp
1 2 3 4 5 6 7 8 9 = 6 + 8 11 = 9/5 x 100% 12
Penanganan Rumah Tidak Layak Huni
Penanganan Rumah Tidak Layak Huni
Berkurangnya 4000 RTLH dan tersedianya data bagi pengurangan N+1
65.884.5 00.000
Perencanaan Kebutuhan Rumah Tidak Layak Huni untuk Usulan BSPS, DAK, dan BKK (2.500 unit): a. Kabupaten Bantul (500 unit) b. Kabupaten Gunungkidul (1.000 unit) c. Kabupaten Sleman (250 unit) d. Kabupaten Kulon Progo (750 unit) : 2500 unit dari 2500 unit
Terlaksanany a Penanganan Rumah Tidak Layak Huni (4080 unit) : 1. Kabupaten Kulon Progo (850 unit) a. Kecamatan Kokap (350 unit) b