Summary of Status Report of Sugarcane Farm-to-Mill Road Projects
STATUS as of June 2018
GAA
2016 2017 2018
No. of.
Sites In Kms.
No. of
Sites
in
Kms.
No. of
Sites in Kms.
Pre-implementation stage 45 45.51
Awarded but construction not yet
started 1 0.70 1 2.13
Awarded but with site modification
Construction completed and ready for
turn-over 32 49.25 18 8.77
Completed but sub-standard or need
repairs 3 3.65
Construction still on-going / Not yet
completed 6 14.81 20 21.08
Not concreted 1 1.61
Not implemented by DPWH 1 2.12
Total 43 71.44 39 30.55 46 47.64
Prepared by:
i ALEX Jhll'H . GALICIA
Member, Technical Working Group-
SIDA Infrastructure Program Committee
Noted by:
ROSE AR1E S. GUMERA
Head, Technical Working Group-
SIDA Infrastructure Program Committee
Sugar Regulatory Administration SUGARCANE FARM -TO - MILL ROADS (FMR) 2016 SIDA FMR Status as of of June 30, 2018
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km DPWH Revised
Length Date Started
Target Date / Date of
Completion Name of Contractor Budget Ceiling (PhP)
Sugarcane Mill District
Implementing DPWH District
Status per SRA Monitoring as of
June 2018
1 II 3rd District Cagayan Solana Brgy. Sampaguita to Brgy. Bantay
2.2500 3.5090 10/18/2016 4/21/2017 Teckon Construction 27,438,501.76 CAGAYAN Cagayan 3rd DEO Completed. For turn-over
2 III 1st District Pampanga Porac Brgy. Pianos to Brgy. Pasbul
1.0045 0.8890 10/24/2016 3/22/2017 Tokwing Construction 12.329,442.83 PAMPANGA Pampanga 2nd
DEO Completed. For turn-over
3 III 3rd District Tarlac Concep- don Brgy, Lilibangan to Brgy. Magao to Castillo
1.1074 1.5503 9/22/2016 12/25/2016 B-12 Construction &
Trading 13,573,394.42
TARLAC
Tarlac 2nd DEO turn-over
Completed. For
4 III 3rd District Tarlac Concep- don 1.3200 Brgy. Lilibangan to Brgy. Castillo
1.2695 9/22/2016 1/19/2017 B-12 Construction &
Trading 16,074,278.00 Tarlac 2nd DEO
Completed. For turn-over
5 IV-A 1st District Batangas Lion Sitlo Molino to Hukayln to Pasong Balayan, Brgy. Kapito
1.23000 1.35000 11/3/2016 5/1/2017 W. Rivera
Construction & Equipment Rentals
15,095,546.50
DON PEDRO
Batangas 1st DEO Completed. For turn-over
6 4-A 1st District Batangas Nasugbu Sitio Magyaman, Brgy. Ban (lad
1.2300 1.2800 11/3/2016 5/1/2017 Vicmar Construction,
Inc. 15,095,546.50 Batangas 1st DEO
Completed. For turn-over
7 4-A 1st District Batangas Balayan Brgy. Taludtod to Brgy. Lucban
1.4200 0.8950 11/3/2016 5/1/2017 Rich Ads Construction
Corp. 17,316,356.50
BALAYAN
Batangas 1st DEO turn-over.
Completed. For
8 4-A 1st District Batangas Calaca Brgy. Pantay Making & Brgy Munting Coral
1.4200 1.4550 11/25/2016 5/4/2017 Vicmar Construction,
Inc. 17,316,356.50 Batangas 1st DEO
Completed. For turn-over.
9 V 3rd District Camarines Sur Pill Brgy. Caroyroyan, Pill, Camarines Sur
0.7800 0.7800 4/11/2017 7/30/2017 St. Bernard
Construction 9,577,04Z00 PENSUMIL Cam. Sur 2nd DEO
Completed. For turn-over
10 NIR 3rd District Negros Occ. Talisay City Brgy, Katilingban 1.0540 1.0540 12/29/2016 3/10/2017 Supreme ABF Const.
& Const. Supply Company Inc.
14,004,894.50
BAC-MURCIA /FIRST FARMERS
turn-over
Neg. Occ. 1st DEO Completed. For turn-over
11 NIR 3rd District Negros Occ. Talisay City Brgy. Concepcion 1.1690 1.1690 11/1/2016 1/19/2017 AFG Const. & Const.
Supply 15,512,637.10 Neg. Occ. 1st DEC
Completed. For turn-over
12 NIR Bacolod City
Negros Occ. Bacolod City Brgy. Felisa, Bacolod City 0.8800 0.9100 8/8/2016 12/21/2016 Wilkinson
Construction 11,707,962.00 Bacolod City DEO
Completed. For
13 NIR 4th District Negros Occ. Bago City 0.7500 Brgy. Bacong to Sitio Sandungao
0.7500 7/27/2015 10/9/2016 Jaime B. Ching
Enterprises 10,000,000.00 MA-AO
turn-over Neg. Occ. 4th DEO
Completed. For
14 NIR 61h District Negros Occ. Hog Brgy. Magballo Proper to Sitlo Montelo, Brgy.
Pinggot
2.0500 2.0500 8/15/2016 5/21/2017 Lumber & Glass
Supply 27,145,594.00
SONEDCO/ KABANKALAN
Neg. Occ. 3rd DEO Completed. For turn-over.
15 NIR 1st District Negros Occ. Calatrava Brgy. Dolls to Main Road 1.8000 1.3950 not stated not stated Wilkinson
Construction 23,814,911.00 SAN CARLOS Neg, Occ. 1st DEO
30% accomplished due to contractor / sub-contractor problem
16 NIR 5th District Negros Occ. Hinigaran
"Brgy, Aranaa ro Candumarao to Camalobalo to Brgy. ..-. -.
1.1300 1.1300 8/4/2016 11/28/2016 JTA Builders turn-over
15,000,000.00
BISCOM / BINALBAGAN
turn-over
Neg. Occ. 2nd DEO
Completed. For
17 NIR 5th District Negros Occ. Hinigaran Brgy. Cambugsa to Brgy. Paticui
1.1300 1.3500 8/4/2016 1/5/2017 Allies Const. & Const.
Supply 15,000,000.00
Neg. Occ. 2nd DEO turn-over
Completed. For
18 NIR 5th District Negros Occ. Hinigaran Brgy. Himaya to Sitio Capirot
1.0078 1.3500 8/4/2016 12/30/2016 Allies Const. & Const.
Supply 13,399,175.30
Neg. Occ. 2nd DEO
Completed. For turn-over
19 NIR 5th District Negros Occ. Hinlgaran Brgy. Tuguis to Brgy. Bagaas
1.1300 1.1300 8/4/2016 1/20/2017 Alfies Const. & Const.
Supply 15,000,000.00
Neg. Occ. 2nd DEO
Completed. For
20 NIR 5th District Negros Occ. La Castellano Crossing 92 to Hacienda Pacita Proper,Brgy. Sag- ang
3.0100 3.0100 8/4/2016 4/10/2017 HLJ Const. & Supply 39,708,111.00 LA CARLOTA Neg. Occ. 2nd
DEO
Completed. For turn-over
21 NIR 3rd District Negros Occ. EB Magalona Brgy. San Isidro to Brgy. Consing
1.4400 1.3755 11/27/2016 2/16/2017 Wilkinson
Construction 19,070,466.00 Neg. Occ. 1st DEO
Completed. For turn-over
Page 1
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km DPWH Revised
Length Date Started
Target Date / Date of
Completion Name of Contractor Budget Ceiling (PhP)
Sugarcane Mill District
Implementing DPWH District
Status per SRA Monitoring as of
June MO_
Completed. For turn-over
22 NIR 3rd District Negros Occ. Silay City Sitio Lupa to Main Road, Brgy. Capltan Ramon
1.3400 1.3400 2/19/2017 5/20/2017 AFG Const. & Const.
Supply 17,747,500.00
HPCO-SILAY
Neg. Occ. 1st DEO
23 NIR 1st District Negros Occ. Escalante City Brgy. Libertad to Brgy. Dian-ay Road, Brgy. Bandila
2.1600 1.7685 10/26/2016 5/2/2017 Supreme ABF Const.
& Const. Supply Company Inc.
28,505,445.03 SAGAY Neg. Occ. 1st DEO Completed. For turn-over
24 NIR 1st District Negros Occ. Escalante City Brgy. Fe to Central Leonor, Brgy. Jonob- jonob
1.8900 1.5690 12/26/2016 5/2/2017 Trimluv Builders &
Supply 25,000,000.00 LOPEZ Neg. Occ. 1st DEO
Completed. For turn-over
25 NIR 6th District Negros Occ. Cauayan Brgy. Talacdan to Sitio Malabong
1.7500 1.7500 8/15/2016 3/13/2017 Supreme ABF Const.
& Const. Supply Company Inc.
23,034,548.07 DACONG- COGON turn-over.
Neg. Occ. 3rd DEO
Completed. For
26 MR 2nd Disttrict
Negros Occ. Cadiz City Sitio Nabinay Overflow to Barangay Mabini
2.1200 not awarded - - - 12, Victoria s City
28,000,000.00
VICTORIAS
Neg. Occ. 1st DEO
Realigned to Brgy.
but was not awarded by DPWH.
27 NIR 3rd District Negros Occ. Victorias City Brgy, 10, Victorias City to Brgy, San Isidro, EB Magalona
2.8800 2.7945 12/21/2016 7/3/2017 Wilkinson
Construction 38,000,000.00 Neg. Occ. 1st DEO 97% Completed.
28 NIR 3rd District Negros Or. Bayawan City
Sitio Pulang Yuta to Brgy. Kalumboyan Proper
1.5200 1.5200 11/13/2016 5/28/2017 HLJ Const. & Supply 20,000,000 TOLONG
Neg. Or. 3rd DEO Completed but with structural cracks
29 NIR 3rd District Negros Or. Boyawan City Brgy. Kalumboyan Proper to Brgy. Tabuan 1.5200 1.5200 8/17/2016 3/2/2017 Nale Construction 20,000,000 Neg. Or. 3rd DEO
Completed. For turn-over
30 NIR 2nd District
Negros Or. Mabinay Barangay Pantao Proper to Sitio Ganas
1.1300 1.1300 3/14/2017 7/17/2017 Legacy Construction 15,000,000.00
BAIS-URSUMCO
Neg. Or. 2nd DEO 98% Completed. Not yet ready for turn-over
31 NIR 2nd District
Negros Or. Tanjay Tanjay Road to Barangay San Miguel
0.7500 0.7500 9/1/2016 2/15/2017 Richfield Builders 10,000,000.00 Neg. Or. 2nd DEO Completed. For turn-over.
32 NIR 2nd District
Negros Or. Ban City Barangay Lunoy to Barangay Cambagahan
1.1300 1.1300 8/23/2016 2/9/2017 HLJ Const. & Supply 15,000,000.00 Neg. Or. 2nd DEO Completed. For turn-over.
33 NIR 1st District Negros Or. Manjuyod Crossing Santa Monica to Barangay Monica
1.2000 1.2000 11/2/2016 1/15/2017 Vesa Engineering &
Construction 16,000,000.00 Neg. Or. 1st DEO
Completed. For turn-over.
34 VI 4th District Iloilo San Enrique Junction Mapill to San Enrique
0.9800 0.9800 11/24/2016 2/26/2017 Kirskat Venture standard work
12,000,000.00
PASSI / ILOILO/ SANTOS-LOPEZ
Iloilo 2nd DEO Completed. Sub-
35 VI 4th District Iloilo Passi Brgy. Man-it to Brgy. Agdayao
2.2000 2.2000 for validation for validation for validation 26,904,074.00 Iloilo 2nd DEO 73% accomplished. Delayed project implementation
36 VI 1st District Capiz President Roxas
Brgy, Cabug Cabug 1.0600 1.1546 10/4/2016 12/22/2016 Kirskat Venture 13,070,534.00 CAPIZ/ MONOMER
Copt 1st DEO Completed. Sub-standard work
37 VI 1st District Capiz Pontevedra Brgy. Lantangan 1.0600 1.3810 10/4/2016 2/28/2017 Rola Construction 13,070,534.00 Capiz 1st DEO Completed. For turn-over
38 VII 4th District Cebu Medellin Brgy. Canhabagat to Main Road to Brgy. Canhabagat Proper
1.3700 1.6750 8/16/2016 12/8/2016 DURANO
Gonzalodo Ent. 16,813,030.00 BOLO- MEDELLIN / Cebu 1st DEO
Completed. For turn-over
Page 2
Region District 'Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km DPWH Revised
Length Date Started
Target Date / Date of
Completion Name of Contractor Budget Ceiling (PhP)
Sugarcane MIII District
Implementing DPWH District
Status per SRA Monitoring as of
June 2018
39 VIII 4th District Leyte Ormoc City Barangay Ipil to Sitio Awlhao, Barangay Boroc
1.4100 1.4440 9/25/2016 12/2/2016 RJIR Enterprises 17,216,329.00 ORMOC Leyte 4th DEO Completed. For turn-over
40 X 3rd District Bukidnon Quezon Crossing Bida Poblacion to Brgy. Lumintao
6.0000 5.0564 11/29/2016 2/21/2018 JT Gamolo
Construction 71,065,322.00 BUKIDNON
95%. Unfinished
Region X graveling o4 shoulder & Railings
41 X 3rd District Bukidnon Maramag Maramag to Sitio Boni-boni, Brgy. Butong Via San Jose & Crystal
6.5000 5.4696 11/29/2016 2/25/2018 JT Gamolo
Construction 77,194,569.00 BUKIDNON Region X
Completed. For turn-over
42 XI 2nd District
Davao del Sur Malalag Brgy, San Isidro 2.2900 2.2318 11/29/2016 4/11/2017 O.G.Santos Construction
27,924,427.09 DAVAO Davao del Sur 1st DEO
40% accomplished. On-going construction on-site.
43 X 2nd District
Maguindanao Pagalungan Crossing Linandangan to Barangay Linandangan
1.6120 3.2000 11/2/2016 2/14/2017 BRE Construction 19,673,471.90 COTABATO Cotabato City
DEO
Not concreted only gravelling.
Declared by DPWH 100% accomplished.
TOTAL 72.18 70.92 914,400,000.00
Prepared by:
61 ALE ICIA
Membe Te hnIcal Working Group-
SIDA Int str cture Program Committee
Noted by:
)2 ROSE ARIE S. (1141 GUMERA
Head, Technical Working Group-
SIDA Infrastructure Program Committee
Page 3
Sugar Regulatory Administration FINAL LIST OF SUGARCANE FARM -TO - MILL ROADS (FMR) 2017 GAA FMR Projects
Status as of June 30, 2018
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Sugarcane Mill District
Implementing DPWH District
Status per SRA Monitoring as of June 2018
1 II 2nd District Cagayan Fiat Sitio Malasat, Sto. Domingo to Sta. Barbara
0.8900 13,689,124.18 CAGAYAN Cagayan 2nd
DEO 90% accomplished. On-going construction
2 III 3rd District Tarlac La Paz Brgy. Comillas to Brgy. Metrico to Brgy. Dumarais
1.3100 20,047,384.55 TARLAC Tarlac 2nd DEO Completed
3 III 3rd District Pampanga Bacolor Brgy. Potrero to Brgy. Maliwalu
0.6000 9,184,779.13 PAMPANGA Pampanga 1st
DEC
25% accomplished. Thickness is only 23 cm. Construction still on-going
4 IV-A 7th District Cavite Magallanes Sitio Maangyo,Urdaneta to Boundary Magallanes- Nasugbu
0.5950 9,082,582.29
DON PEDRO
Cavite 2nd DEC 80% accomplished. On go
ing construction
5 IV-A 1st District Batangas Lian Sitio Cumba to Brgy. Bulsa 0.59500 9,082,582.29 Batangas 1st
DEC 90% going construction
6 IV-A 3rd District Batangas Alitagtag Brgy. Pingas 0.1270 2,100,000.00
BALAYAls1
3rd
Batangas DEC
On-going construction
7 IV-A 4th District Batangas lbaan Brgy. Pangao 0.2250 3,600,000.00
Batangas 4th DEO
Completed
8 IV-A 4th District Batangas lbaan Brgy. Dayapan 0.3170 5,000,000.00 Completed
9 IV-A 4th District Batangas lbaan Brgy. Mabalor 0.6700 10,351,255.04 On-going construction
10 V 3rd District Camarines Sur
. Pill Sitio Upper Lampog to Cadapdapan, Brgy. Tinangis
0.3290 5,174,523.45 PENSUMIL Camarines Sur
2nd DEO
50% accomplished. Construction temporarily suspended for the hauling trucks to pass-by.
Page 1
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Sugarcane Mill District
Implementing DPWH District
Status per SRA Monitoring as of June 2018
11 VI 4th District Iloilo Passi City Brgy. Man-it to Brgy. Agdayao Road
1.5170 23,738,126.34 ILOILO Iloilo 2nd DEO 78% accomplished. On-go
ing construction
12 VI 2nd District Capiz Sigma So. Tuburan to So. Marubrub , Brgy. Parian
0.8850 16,059,133.54 CAPIZ/ MONOMER
Capiz 2nd DEO Completed
13 VI 3rd District Negros Occ Si lay City So. Binulwagan to So. Patag Diutay, Brgy. Guimbalaon
1.0025 17,451,080.35 HPCO-SILAY
Negros Occ. 1st DEO
40% accomplished. On-going construction
14 VI 3rd District Negros Occ Talisay City Sta. Teresita, Brgy. Dos Hermanas - Hiyang hiyang
0.5738 12,215,650.82 FIRST FARMERS / BAC-MUR
Completed
15 VI 3rd District Negros Occ Talisay City Sitio Bayusan, Brgy. San Fernando
0.8508 15,600,000.00 Completed
16 VI 5th District Negros Occ Hinigaran Brgy. Aranda- Brgy. Candumarao - Brgy. Camalobalo- Brgy. Calapi
0.7500 14,403,407.64
BISCOM Negros Occ.
2nd DEO
Completed
17 VI 5th District Negros Occ Hinigaran Brgy. Camalobalo to Brgy.0.1875 Baga-as
7,500,000.00 Completed
18 VI 5th District Negros Occ Himamaylan Sitio Sambag to Sitio Bonton0.1875 1 & 2, Brgy. Carabalan
7,500,000.00 Completed
19 VI 5th District Negros Occ Himamaylan Had. Maria Elena to Sitio Cabagal, Brgy. Buenavista
0.1875 7,500,000.00 Completed
20 VI 6th District Negros Occ Ilog Brgy. Magballo Proper to Sto. Montello, Pinggot, Ilog
, 0.7175 13971213.32 , DACONG- COGON
Negros Occ. 3rd DEO
65% accomplished. On-going construction
21 VI 2nd District Negros Occ Sagay City Brgy. Puey Proper to Huevesan Proper
0.4530 10,739,076.61
SAGAY- Negros Occ. 1st
15% accomplished. Delayed construction due to unfavorable weather condition
Page 2
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Sugarcane Mill District
Implementing DPWH District
_
Status per SRA Monitoring as of June 2018
22 VI 1st District Negros Occ Calatrava Brgy. Minapasok proper to Crossing Kawayan
0.4530 10,739,076.61
DANAO DEO 10% accomplished. Delayed construction due to unfavorable weather condition
23 VI 4th District Negros Occ Pontevedra Crossing Merced to Merced Sevillino proper DSB
0.3105 9,000,000.00
LA CARLOTA
Negros Occ. 4th DEO
Completed
24 VI 4th District Negros Occ La Carlota City
Brgy. San Miguel proper to Estela, San Miguel
0.2060 7,724,811.66 Completed
25 VI 5th District Negros Occ La Castellana Crossing Isabel, Sag Brgy. - ang to Sitio Minoro, Isabel
0.2060 7,724,811.66 Negros Occ.
2nd DEO Completed
26 VI 2nd District Negros Occ Sagay City Banga Malubon to Brgy. Malubon Proper
1.0045 17,476,952.97 LOPEZ Negros Occ. 1st
DEO 75% accomplished. Construction on-going
27 VI 6th District Negros Occ Cauayan Brgy. Caliling National Highway to Sitio Patol, Brgy. Caliling
0.8775 15,924,596 SONEDCO Negros Occ. 3rd
DEO 90% accomplished. On-going construction
28 VI 3rd District Negros Occ Victorias City
Brgy. 16, Victorias City to Brgy. San Isidro, Saravia
1.2400 20,386,303
VICTORIAS
Negros DEO
Occ. 1st 30%. Construction on-going
29 VI 2nd District Negros Occ Cadiz City National Highway, Brgy. Luna to Brgy. Andres Bonifacio, Cadiz City
1.2400 20,386,302.90 Negros Occ. 1st
DEO 95%. Construction on-going
30 VI 1st District Negros Occ Calatrava Brgy. Agpangi to Sitio Tres Marian Road
0.6790 14,475,729.36 SAN CARLOS Negros Occ. 1st
DEO 70% accomplished. On-going construction
31 VI 4th District Negros Occ Bago City Brgy. Ilijan Concrete Road to Sto. Malunggay to NAFW A
0.7015 13,777,168.70 MA-AO Negros Occ. 4th
DEO
Pending signature of ROW of one land owner to start implementation
32 VII 3rd District Negros Or. Sta. Catalina Sitio Nagbagang, Poblacion to Sitio Avocado, Brgy. Talalac
0.4310 12,011,362.57 TOLONG Negros Oriental
3rd DEO Completed
Page 3
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Status per SRA Monitoring as
Sugarcane Mill District
Implementing DPWH District of June 2018
33 VII 2nd District Negros Or. Mabinay Brgy. Tara proper to Sitio Bayog, Brgy. Tara
2.3140 34,716,097.77 BAIS- URSUMCO
Negros Oriental 2nd DEO
On-going construction. 5% accomplished
34 VII 4th District Cebu Medellin
Brgy. Luy-a (Bomedco gate) to Brgy. Caputatan Sur junction mainline national highway
0.3040 8,919,584.80 BOGO-MEDELLIN / DURANO
Cebu 1st DEO Completed
35 VIII 4th District Leyte Ormoc City
Barangay Ipil to Sitio Awihao, Boroc
0.2000 5,239,574.99 ORMOC-KANANGA
Leyte 4th DEO Completed
36 X 3rd District Bukidnon Maramag & Quezon
Maramag to Sitio Boni-boni, Brgy. Butong, Quezon Via San Jose & Crystal
3.6500 55,500,149.74
BUKIDNON Bukidnon 2nd
DEO
50%. Unfinished concreting and widening
37 X 3rd District Bukidnon Maramag Maramag to Brgy. Dologon via San Roque
2.1300 32,575,000.00 65%. Unfinished concreting and widening
38 XI 2nd District
Davao del Sur
Sulop Labon Gamay Road, Brgy. Labon
0.8550 13,115,644.69 DAVAO Davao del Sur
DEO Completed
39 XII 3rd District
North Cotabato
Matalam Poblacion, Matalam to Kidama-Manubuan
0.8700 13,361,913.19 COTABATO North Cotabato
1st DEO Completed. 788 meters concreted
TOTAL 30.64 547,045,000.00
Prepared by:
Noted by:
ALEX 0 N R. ALICIA Membe T chnical Working Group-SIDA Infrastructure Program Committee
ROSEMARIE S. GUM ERA Head, Technical Working Group- SIDA Infrastructure Program Committee
Page 4
Sugar Regulatory Administration
FINAL LIST OF SUGARCANE FARM -TO - MILL ROADS (FMR)
2018 SIDA FMR
Status as of June 30, 2018
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Sugarcane Mill District
Bafch No. DPWH Implementing Office
Status as of June 2018;
1 II 3rd Cagayan Tuao Bry. Lakambini to Brgy. Mambacag, Cagayan
0.5950 9,255,532.67 CAGAYAN 1 Cagayan 3rd DEO For bidding
2 II 4th Isabela Echague Brgy. Babaran, to Brgy. Buselelao and Sta. Cruz, Echague, Isabela
0.5500 8,576,211.77 ISABELA 1 Isabela 4th DEO
For bidding
3 — III 3rd Tarlac Concepcion
Magao to Culatingan Road 0.6150 9,559,064.88 TARLAC
1 Tarlac 2nd DEO For bidding
4 Lilibangan to Castillo Road 0.6150 9,559,064.88 1 Tarlac 2nd DEO For bidding
5 III 2nd Porac Pampanga Brgy. Salu, Porac to Tokwing Resettlement Area, Porac
0.72000 11,142,535.19 PAMPANGA 1 Pampanga 2nd DEO For bidding
6
IV-A
1st
Batangas
Tuy Mataywanak, Tuy 0.8630 13,309,552.76
DON PEDRO
1 Batangas 1st DEO For site validation by
DPWH
—
7 1st Calatagan Barangay Lucsuhin to Brgy. Quilitisan
0.8630 13,309,552.76 2 Batangas 1st DEO For site validation by
DPWH
8
A iv-i,
9,„
4th
Batangas
Padre Garcia Brgy Maugat West 1.4020 21,500,133.38
BALAYAN
2 Batangas 4th DEO For site validation by
DPWH
— 4th lbaan Brgy. Munting Tubig 0.271 0 4,300,026.68 2 Batangas 4th DEO For bidding
10 1st
Balayan
Brgy. Dalig 0.0820 1,433,342.23 2 Batangas 1st DEO For bidding
11 1st Brgy. Cayponce 0.4590 7,1 66,711.13 2 Batangas 1st DEO For bidding
12 1st Brgy. Magabe 0.1430 2,365,01 4.67 2 Batangas 1st DEO For bidding
13 V 3rd Camarines Sur Pili Brgy. Binanuaanan, Pili, Cam. Sur 0.4470 6,976,841.64 PENSUMIL 1 Camarines Sur 2nd DEO
DPWH conducted site
validation
14
— VI
4th
Iloilo
Anilao Brgy. Poblacion-Palaypay- Mastro, Anilao, Iloilo
1.0830 1 6,659,079.01
ILOILO
1 Iloilo 2nd DEO For site validation by
DPWH
15 4th San Enrique Brgy. Abaco Proper-Sitio Imbaquiran to Brgy. Braulan
1.0830 1 6,659,079.01 1 Iloilo 2nd DEO For site validation by
DPWH
16
VI
1st
Capiz
Pontevedra Sitio San Jose, Brgy. Hipona- Brgy. Banate Road
0.4365 6,818,477.02
CAPIZ
1 Capiz 1st DEO Surveyed by Capiz 1st
DEO
17 1 st Pontevedra Brgy. Yatingan - Sitio San Jose, Brgy. Hipona Road
0.4365 6,818,477.02 1 Capiz 1 st DEO Surveyed by Capiz 1st
DEO
18 1st Pres. Roxas Brgy. Ibaca - Brgy. Cubay Road 0.4365 6,818,477.02 1 Capiz 1st DEO Surveyed by Capiz 1st
DEO
19 — VI
3rd Negros Occidental
Silay City
So. Binolwangan- So. Patag Duitay, Brgy. Guimbala-on
0.7660 11,833,356.89 HAWPHIL-SILAY
1 Negros Occ. 1st DEO For bidding
20 3rd Crossing Luguay, Brgy. Hawaiian, Silay City
1.0860 26,500,000.00 1 Negros Occ. 1st DEO For bidding
Page 1
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Sugarcane Mill District
Batch No. DPWH Implementing Office
Status as of June 2018
21 VI 3rd Negros Occidental
Talisay City Sta. Teresita, Brgy. Dos Hermanas to Hiyang-hiyang, Brgy. Katilingban
2.1105 32291,614.28 BACOLOD-MURCIA / FIRST FARMERS
1 Negros Occ. 1st DEO For bidding
22 —
VI
5th
Negros Occidental
Isabela Highway Main Road to Had. 1.1550 Nalipay, Brgy. 5 For
17,759,378.84
BISCOM
1 Negros Occ. 2nd DEO bidding
23 5th Himamaylan City
Sitio Sambag to Bonton 1 & 2, 1.1550 Brgy. Carabalan For
17,759,378.84 1 Negros Occ. 2nd DEO bidding
24 5th Himamaylan City
Crossing Reynante to Sitio Cabagal, Brgy. Buenavista
1.1550 1 7,759,378.84 1 Negros Occ. 2nd DEO For bidding
25 VI
2nd Negros Occidental
Sagay City
Crossing Baviera Proper to So. Pinamintigan
SAGAY-DANAO 0.9520 14,668,963.52 1 Negros Occ. 2nd DEO
For bidding —
26 2nd Brgy. Puey proper to Sitio Bogor 0.9520 14,668,963.52 2 Negros Occ. 2nd DEO For bidding
27 VI 5th Negros Occidental
La Castellano Sitio Nolan to Hilonga, Brgy. Mansalanao
2.1300 32,586,671.80 LA CARLOTA 1 Negros Occ. 2nd DEO Awarded
28 VI 2nd Negros Occidental
Sagay City Brgy. Malubon Proper to Campo Himoga-an Proper, Sagay City
1.5620 23,948,250.89 LOPEZ 1 Negros Occ. 1st DEO For bidding
29
VI
6th
Negros Occidental
Sipalay City Brgy. Camindangan, National Highway to Sitio Calagmacan, Camindangan
0.9310 14,345,541.89
SONEDC0- DACONGCOGO N
1 Negros Occ. 3rd DEO For bidding
— 30
— 6th Cauayan
Purok 4, Brgy. Talacdan to Sitio Ginubatan, Talacdan 0.9310 14,345,541.89 1 Negros Occ. 3rd DEO For bidding
31 6th Ilog Sitio Old Pinggot, Brgy. Pinggot to Sitio Montello, Pinggot, Ilog
0.9310 14,345,541.89 1 Negros Occ. 3rd DEO For bidding
32
VI
2nd
Negros Occidental
Manapla
National Road to Had. Dapdap Road, Brgy. Tortosa
1.4470 22,199,353.30
VICTORIAS
1 Negros Occ. 1st DEO For bidding
—
33 2nd Had. San Jose road to Had. San Pablo Road, Brgy. San Pablo
1.4470 22,199,353.30 1 Negros Occ. 1st DEO For bidding
34 VI
1st Negros Occidental
San Carlos Brgy. Codcod Proper to Sitio Iliranan
0.3559 9,848,326.67 SAN CARLOS
2 Negros Occ. 1st DEO For bidding
—
35 1st Calatrava Crossing Malanog to Brgy . Malanog
0.3559 9,848,326.67 1 Negros Occ. 1st DEO For bidding
36 VI 4th Negros Occidental
Bago City 2nd Purok Lopues to Purok Sta. Rita, Brgy. Dulao
1.2540 19,206,761.15 MA-AO 1 Negros Occ. 4th DEO For bidding
37 VII 3rd Negros Oriental Bayawan City Sitio Salong-salong to Sitio Nayaba-an, Brgy. Bugay, Bayawan City
1.4043 20,099,198.62 TOLONG 1 Negros Or. 3rd DEO Waiting for bidding of
DPWH
38 VII 2nd Negros Oriental Mabinay Brgy. Pantao to Sitio Bulod, Mabinay
3.0917 47,220,812.70 Bais-URSUMCO 1 Negros Or. 2nd DEO For bidding
Page 2
Region District Province Municipality / City
Description of Proposed Sugarcane FMR
Length, Km
Budget Ceiling (PhP)
Sugarcane Mill District
Batch No. DPWH Implementing Office
Status as of June 2018'
39 VII 4th Cebu Medellin
Junction national highway-Brgy. Caputatan Norte to Brgy. Doling-ding to junction mainline national highway, Brgy. Panug-nawan
0.7456 11,525,425.67 BOGO-
MEDELLIN 1 Cebu 1st DEO
For bidding
40 VIII 4th Leyte Ormoc City Brgy. Juaton to Brgy. Dolores 0.7745 11,965,327.41 ORMOC-
HIDECO 1 Leyte 4th DEO
For bidding
41
_
X
3rd
Bukidnon
Don Carlos
Purok 4B (Phase II) Sitio Banbanagan, Moray maray, Don Carlos
1.0400 16,000,000.00
BUKIDNON
1 Bukidnon 2nd DEO For bidding
42 _
3rd Brgy. Bocboc to Kiara, Don Carlos
3.1450 48,000,000.00 1 Bukidnon 2nd DEO For bidding
43 3rd Maramag Maramag/ Boni-boni FMR Junction to Crystal Sugar
0.2520 4,000,000.00 1 Bukidnon 2nd DEO For bidding
— 44 3rd Quezon Boni-boni to Oadi 3.0480 46,533,451.26 1 Bukidnon 2nd DEO For bidding
45 XI 2nd Davao del Sur Kiblawan San Isidro - Bagong Silang, Brgy. San Isidro
1.1830 18,191,714.28 DAVAO 1 Davao del Sur DEO For bidding
46 XII 3rd North Cotabato Carmen Brgy. Kitulaan-Brgy. Pebpoloan-Brgy. Lanoon
1.1790 18,122,192.20 COTABATO 2 North Cotabato 1st
DEO Surveyed by DPWH
TOTAL 47.64 750,000,000.00
Prepared by:
Noted by:
ALEX 7M1 R. GALICIA
ROSENIARIIS. GUMERA
Memb r, technical Working Group- Head, Technical Working Group-
SIDA Infrastructure Program Committee
SIDA Infrastructure Program Committee
Page 3