R E K A P I T U L A S I NAMA LENGKAP Jabatan

24
REKAPITULASI KEGIATAN : PEKERJAAN : PEMBANGUNAN SARANA PENYEDIAAN AIR BERSIH LOKASI : DESA SEGOLER KEC. TEBAS KAB. SAMBAS SUMBER BIAYA : DAK SHARING DAU TAHUN ANGGARAN : 2012 A. I. PEKERJAAN PERSIAPAN Rp. 0.00 SUB JUMLAH A Rp. 0.00 B. I. PEKERJAAN SARINGAN Rp. 0.00 II. PEKERJAAN BRONCAPTERING Rp. 0.00 III. PEKERJAAN PENGADAAN/PEMASANGAN ACC Rp. 0.00 SUB JUMLAH B Rp. 0.00 C. I. PENGADAAN PIPA Rp. 0.00 II. PEKERJAAN TANAH Rp. 0.00 III. PEK. PEMASANGAN PIPA Rp. 0.00 IV. PEK. PENGADAAN/PEMASANGAN ACC 0.00 SUB JUMLAH C Rp. 0.00 D. PEK. BANGUNAN PELENGKAP, PERLINTASAN DAN PENGECATAN I. PEKERJAAN BANGUNAN PELENGKAP Rp. 0.00 II. PEK. JEMBATAN PERLINTASAN PIPA Rp. 0.00 III. PEK. PENGECATAN Rp. 0.00 SUB JUMLAH D Rp. 0.00 E. PEK. KONSTRUKSI HIDRAN UMUM (HU) I. PEKERJAAN KONSTRUKSI Rp. 0.00 II. PEKERJAAN TEMPAT CUCI Uk. 1,5 M X 2,0 M Rp. 0.00 III. PEKERJAAN LAIN -LAIN Rp. 0.00 1 UNIT HU Rp. 0.00 5 UNIT HU Rp. 0.00 SUB JUMLAH E Rp. 0.00 F. PEK. KONSTRUKSI KRAN UMUM (KU) I. PEKERJAAN KONSTRUKSI Rp. 0.00 II. PEKERJAAN ACCESSORIES Rp. 0.00 1 UNIT KU Rp. 0.00 2 UNIT KU Rp. 0.00 SUB JUMLAH F Rp. 0.00 G. PEKERJAAN LAIN-LAIN I. Pengetesan Pipa Rp. 0.00 SUB JUMLAH G Rp. 0.00 PENYEDIAAN SARANA DAN PRASARANA AIR MINUM BAGI MASYARAKAT BERPENGHASILAN RENDAH 0.00 Rp. 0.00 PEKERJAAN BRONCAPTERING PEKERJAAN PENDAHULUAN DIBULATKAN PEKERJAAN PERPIPAAN TERBILANG : Rp. PT / CV............................ NAMA LENGKAP Jabatan JUMLAH A + B + C + D + E + F + G Tempat, Tanggal, Bulan dan tahun

Transcript of R E K A P I T U L A S I NAMA LENGKAP Jabatan

R E K A P I T U L A S I

KEGIATAN :

PEKERJAAN : PEMBANGUNAN SARANA PENYEDIAAN AIR BERSIH

LOKASI : DESA SEGOLER KEC. TEBAS KAB. SAMBAS

SUMBER BIAYA : DAK SHARING DAU

TAHUN ANGGARAN : 2012

A.

I. PEKERJAAN PERSIAPAN Rp. 0.00

SUB JUMLAH A Rp. 0.00

B.

I. PEKERJAAN SARINGAN Rp. 0.00

II. PEKERJAAN BRONCAPTERING Rp. 0.00

III. PEKERJAAN PENGADAAN/PEMASANGAN ACC Rp. 0.00

SUB JUMLAH B Rp. 0.00

C.

I. PENGADAAN PIPA Rp. 0.00

II. PEKERJAAN TANAH Rp. 0.00

III. PEK. PEMASANGAN PIPA Rp. 0.00

IV. PEK. PENGADAAN/PEMASANGAN ACC 0.00

SUB JUMLAH C Rp. 0.00

D. PEK. BANGUNAN PELENGKAP, PERLINTASAN DAN PENGECATAN

I. PEKERJAAN BANGUNAN PELENGKAP Rp. 0.00

II. PEK. JEMBATAN PERLINTASAN PIPA Rp. 0.00

III. PEK. PENGECATAN Rp. 0.00

SUB JUMLAH D Rp. 0.00

E. PEK. KONSTRUKSI HIDRAN UMUM (HU)

I. PEKERJAAN KONSTRUKSI Rp. 0.00

II. PEKERJAAN TEMPAT CUCI Uk. 1,5 M X 2,0 M Rp. 0.00

III. PEKERJAAN LAIN -LAIN Rp. 0.00

1 UNIT HU Rp. 0.00

5 UNIT HU Rp. 0.00

SUB JUMLAH E Rp. 0.00

F. PEK. KONSTRUKSI KRAN UMUM (KU)

I. PEKERJAAN KONSTRUKSI Rp. 0.00

II. PEKERJAAN ACCESSORIES Rp. 0.00

1 UNIT KU Rp. 0.00

2 UNIT KU Rp. 0.00

SUB JUMLAH F Rp. 0.00

G. PEKERJAAN LAIN-LAIN

I. Pengetesan Pipa Rp. 0.00

SUB JUMLAH G Rp. 0.00

PENYEDIAAN SARANA DAN PRASARANA AIR MINUM BAGI MASYARAKAT BERPENGHASILAN

RENDAH

0.00

Rp. 0.00

PEKERJAAN BRONCAPTERING

PEKERJAAN PENDAHULUAN

DIBULATKAN

PEKERJAAN PERPIPAAN

TERBILANG :

Rp.

PT / CV............................

NAMA LENGKAP

Jabatan

JUMLAH A + B + C + D + E + F + G

Tempat, Tanggal, Bulan dan tahun

KEGIATAN : PENYEDIAAN SARANA DAN PRASARANA AIR MINUM BAGI MASYARAKAT BERPENGHASILAN RENDAH

PEKERJAAN : PEMBANGUNAN SARANA PENYEDIAAN AIR BERSIH

LOKASI : DESA SEGOLER KEC. TEBAS KAB. SAMBAS

SUMBER BIAYA : DAK SHARING DAU

TAHUN ANGGARAN : 2012

HARGA JUMLAH

NO U R A I A N P E K E R J A A N SAT VOL ANALISA SATUAN HARGA

(Rp) (Rp)

(1) (2) (3) (4) (5) (6) (7)

A.

I PEKERJAAN PERSIAPAN

1 Pembersihan Lapangan/pengukuran/pematokan M' 22.00 An. TSN 6.8+An. TSN 6.4 0.00 0.00

2 Papan nama proyek Bh 1.00 0.00 0.00

3 Sewa los kerja Bh 1.00 0.00 0.00

4 Mobilisasi dan Demobilisasi Ls 1.00 0.00 0.00

Jumlah I 0.00

SUB JUMLAH A 0.00

B.

I PEKERJAAN SARINGAN

1 Incian Pipa GIP Ǿ 150 mm P = 1 m ( lengkap ) Unit 1.00 0.00 0.00

2 Saringan dari Pipa GIP Ǿ 150 mm dibor 10 mm x 10 mm Unit 1.00 0.00 0.00

3 Pengamanan Saringan dari kawat (lengkap) Unit 1.00 0.00 0.00

4 Pipa Penguras GIP Ǿ 100 mm lengkap + gate valve L = 1,5 m Unit 1.00 0.00 0.00

Jumlah I 0.00

DAFTAR KUANTITAS HARGA

PEKERJAAN BRONCAPTERING

PEKERJAAN PENDAHULUAN

Jumlah I 0.00

II PEKERJAAN BRONCAPTERING

1 Pembuatan bendung sementara (kisdam) Krg 31.00 0.00 0.00

2 Galian tanah pada pondasi M3 7.60 An. TSN 6.1 0.00 0.00

3 Pengecoran dinding dan lantai M3 14.43 An. SN BT 6.5 0.00 0.00

4 Bekisting dinding M2 26.40 An. PF 6.33 0.00 0.00

5 Pembesian Kg 623.09 Anls. SP.I 0.00 0.00

6 Pasangan batu kosong dibawah lantai M3 5.64 An. SNBK 6.14 0.00 0.00

7 Plesteran M2 26.60 An.SN. PS 6.13 0.00 0.00

Jumlah II 0.00

III PEKERJAAN PENGADAAN/PEMASANGAN ACC

1 All Flangeed Gate Valve Ǿ 6" Bh 2.00 0.00 0.00

2 Blank Flangeed Ǿ 6" Bh 1.00 0.00 0.00

3 Baut 5/8 - 25 cm Bh 10.00 0.00 0.00

Jumlah III 0.00

SUB JUMLAH B 0.00

C. PEKERJAAN PERPIPAAN

I PENGADAAN PIPA

1 Pipa GIP Ø 6" m' 8.00 - 0.00 0.00

2 Pipa GIP Ø 3" m' 12.00 - 0.00 0.00

3 Pipa PVC Ø 6" ( SNI ) m' 18 - 0.00 0.00

4 Pipa PVC Ø 4" ( SNI ) m' 666 - 0.00 0.00

5 Pipa PVC Ø 3" ( SNI ) m' 618 - 0.00 0.00

6 Pipa PVC Ø 2" ( SNI ) m' 1,746 - 0.00 0.00

Jumlah I 0.00

II PEKERJAAN TANAH

1 Galian Tanah untuk Pipa PVC Ø 4" m' 666 An. TSN 6.6.2 0.00 0.00

2 Galian Tanah untuk Pipa PVC Ø 3" m' 618 An. TSN 6.6.1 0.00 0.00

3 Galian Tanah untuk Pipa PVC Ø 2" m' 1,746 An. TSN 6.6.1 0.00 0.00

4 Urugan Tanah Kembali utk Pipa PVC Ø 4" m' 666 An. TSN 6.9.1 0.00 0.00

5 Urugan Tanah Kembali utk Pipa PVC Ø 3" m' 618 An. TSN 6.9.12 0.00 0.00

6 Urugan Tanah Kembali utk Pipa PVC Ø 2" m' 1,746 An. TSN 6.9.12 0.00 0.00

Jumlah II 0.00

III PEK. PEMASANGAN PIPA

1 Pipa GIP Ø 3" m' 12.00 - 0.00 0.00

2 Pipa PVC Ø 4" ( SNI ) m' 666 - 0.00 0.00

3 Pipa PVC Ø 3" ( SNI ) m' 618 - 0.00 0.00

4 Pipa PVC Ø 2" ( SNI ) m' 1,746 - 0.00 0.00

Jumlah III 0.00

IV PEK. PENGADAAN/PEMASANGAN ACC

1 All Flanged Gate Valve Ø 4 " Bh 2.00 - 0.00 0.00

2 All Flanged Gate Valve Ø 3 " Bh 2.00 - 0.00 0.00

3 All Flanged Gate Valve Ø 2 " Bh 2.00 - 0.00 0.00

4 All Flanged Bend GIP Ø 3 " x 45 derajat Bh 6.00 - 0.00 0.00

5 All Socket Bend PVC Ø 4 " x 90 derajat Bh 1.00 - 0.00 0.00

6 All Socket Bend PVC Ø 4 " x 45 derajat Bh 2.00 - 0.00 0.00

7 All Socket Bend PVC Ø 3 " x 90 derajat Bh 1.00 - 0.00 0.00

8 All Socket Bend PVC Ø 3 " x 45 derajat Bh 2.00 - 0.00 0.00

9 All Socket Bend PVC Ø 2 " x 90 derajat Bh 1.00 - 0.00 0.00

10 All Socket Bend PVC Ø 2 " x 45 derajat Bh 2.00 - 0.00 0.00

16 All Socket TEE PVC Ø 4 " X 4 " Bh 1.00 - 0.00 0.00

17 All Socket TEE PVC Ø 4 " X 3 " Bh 1.00 - 0.00 0.00

18 All Socket TEE PVC Ø 3" X 3 " Bh 1.00 - 0.00 0.00

19 All Socket TEE PVC Ø 3 " X 2 " Bh 2.00 - 0.00 0.00

20 All Socket TEE PVC Ø 2 " X 2 " Bh 1.00 - 0.00 0.00

22 Flanged Spigot PVC Ø 4 " Bh 2.00 - 0.00 0.00

23 Flanged Spigot PVC Ø 3 " Bh 4.00 - 0.00 0.00

24 Flanged Spigot PVC Ø 2 " Bh 2.00 - 0.00 0.00

25 Blank Flanged Ø 6 " Bh 6.00 - 0.00 0.00

26 Blank Flanged Ø 4 " Bh 8.00 - 0.00 0.00

27 Blank Flanged Ø 3 " Bh 8.00 - 0.00 0.00

28 Blank Flanged Ø 2 " Bh 8.00 - 0.00 0.00

30 All Flanged Tee GIP Ø 4 " Bh 1.00 - 0.00 0.00

31 All Flanged Tee GIP Ø 3 " Bh 1.00 - 0.00 0.00

32 All Flanged Tee GIP Ø 2 " Bh 1.00 - 0.00 0.0032 All Flanged Tee GIP Ø 2 " Bh 1.00 - 0.00 0.00

33 Air Valve Ø 4 " Bh 1.00 - 0.00 0.00

34 Air Valve Ø 3 " Bh 1.00 - 0.00 0.00

35 Air Valve Ø 2 " Bh 1.00 - 0.00 0.00

36 DOP PVC Ø 3 mm Bh 1.00 - 0.00 0.00

37 DOP PVC Ø 2 mm Bh 2.00 - 0.00 0.00

38 Solvent Cement Liter 10.50 - 0.00 0.00

39 All Socket Reducer PVC Ø 4 " x 3" Bh 1.00 - 0.00 0.00

40 All Socket Reducer PVC Ø 3 " x 2" Bh 1.00 - 0.00 0.00

41 Packing Karet Ø 6 " Bh 4.00 - 0.00 0.00

42 Packing Karet Ø 4 " Bh 4.00 - 0.00 0.00

43 Packing Karet Ø 3 " Bh 4.00 - 0.00 0.00

44 Packing Karet Ø 2 " Bh 8.00 - 0.00 0.00

45 Baut 5/8 - 25 cm Bh 58.00 - 0.00 0.00

Jumlah IV 0.00

SUB JUMLAH C 0.00

D. PEK. BANGUNAN PELENGKAP, PERLINTASAN DAN PENGECATAN

I PEKERJAAN BANGUNAN PELENGKAP

1 Pek. Angker Blok untuk Pipa GIP Ǿ 6" Bh 1.00 - 0.00 0.00

2 Pek. Angker Blok Bend GIP Ǿ 6" x 45 0 Bh 1.00 - 0.00 0.00

3 Pek. Bak Pengaman Gate Valve dia. 4" (70 x 70 x 90 cm) Bh 1.00 - 0.00 0.00

4 Pek. Bak Pengaman Gate Valve dia. 3" (70 x 70 x 90 cm) Bh 1.00 - 0.00 0.00

5 Pek. Bak Pengaman Gate Valve dia. 2" (70 x 70 x 90 cm) Bh 1.00 - 0.00 0.00

Jumlah I 0.00

II PEK. JEMBATAN PERLINTASAN PIPA

1 Jembatan Perlintasan Pipa GIP Ø 3" sebanyak 3 unit

- Pengadaan Kayu Belian uk. 5/10 - 10/10 cm M3 0.57 - 0.00 0.00

- Pek. Meruncing tiang Btg 12.00 An. BOW (E.1) 0.00 0.00

- Pek. Menumbuk Tiang m' 12.00 An. BOW (E.13/M') 0.00 0.00

- Pek. Membuat Pen dan Lubang Bh 12.00 An. BOW (E.4) 0.00 0.00

- Pek. Konstruksi balok atas M3 0.57 An. BOW (F.1/M3) 0.00 0.00

- Baut 5/8" Btg 54.00 - 0.00 0.00

- Plat Beugel Btg 6.00 - 0.00 0.00

Jumlah II 0.00

III PEK. PENGECATAN

1 Pek. Pengecatan Cat Dasar dan Cat Anti Korosif Pipa GIP M2 30.07 An.K.23 + Supl K.23a - -1 Pek. Pengecatan Cat Dasar dan Cat Anti Korosif Pipa GIP M2 30.07 An.K.23 + Supl K.23a - -

Jumlah III 0.00

SUB JUMLAH D 0.00

E. PEK. KONSTRUKSI HIDRAN UMUM (HU)

I PEKERJAAN KONSTRUKSI

1 Galian Tanah M3 26.40 An. TSN 6.1 0.00 0.00

2 Cerucuk dia. 8-10 P=4 m Btg 58.00 0.00 0.00

3 Batu Pecah 10/15 M3 0.72 0.00 0.00

4 Urugan Pasir dibawah pondasi M3 0.48 An. TSN 6.11 0.00 0.00

5 Cor Beton untuk pondasi M3 3.36 An. SN BT 6.4 0.00 0.00

6 Plesteran Pondasi t = 2 cm M2 6.72 An.SN. PS 6.13 0.00 0.00

7 Bekisting pondasi M2 19.20 Anls. B.1.d 0.00 0.00

8 Cor Beton Tumbuk untuk lantai camp 1:2:3 M3 0.82 An. SN BT 6.5 0.00 0.00

9 Urugan Pasir M3 1.62 An. TSN 6.11 0.00 0.00

Jumlah I 0.00

II PEKERJAAN TEMPAT CUCI Uk. 1,5 M X 2,0 M

1 Pasir Urug tbl 10 cm M3 0.35 An. TSN 6.11 0.00 0.00

2 Galian tanah kanstin M3 0.06 An. TSN 6.1 0.00 0.00

3 Pengecoran kanstin 10 x 20 cm M3 0.11 An. SN BT 6.5 0.00 0.00

4 Pengecoran lantai beton tumbuk 1,3 m x 2,0 x m x t = 7 cm M3 0.24 An. SN BT 6.5 0.00 0.00

5 Plesteran lantai t = 2 cm M2 3.48 An.SN. PS 6.13 0.00 0.00

Jumlah II 0.00

III PEKERJAAN LAIN -LAIN

1 Pengadaan Bak fibre Glass Kap. 2,0 M3 Bh 1.00 0.00 0.00

2 Kran air 3/4" Bh 2.00 0.00 0.00

3 Pipa penguras bak + Dop dia. 3/4" Bh 1.00 0.00 0.00

4 Pipa GIP dia. 3/4" M' 6.00 0.00 0.00

5 Pipa GIP dia. 1/2" M' 1.50 0.00 0.00

6 Klem sadel dia. 3 x 3/4" Bh 1.00 0.00 0.00

7 Elbow Drat GIP dia. 3/4" Bh 3.00 0.00 0.00

8 Socket Drat GIP dia. 3/4" Bh 3.00 0.00 0.00

9 Valve Socket PVC dia. 3/4" Bh 2.00 0.00 0.009 Valve Socket PVC dia. 3/4" Bh 2.00 0.00 0.00

10 Ball kran dia. 3/4" Bh 1.00 0.00 0.00

11 Pocet Socket PVC dia. 1/2" Bh 2.00 0.00 0.00

12 All Socket Drat GIP dia. 1/2" Bh 2.00 0.00 0.00

13 Isolatif Roll 3.00 0.00 0.00

14 Pelampung air Bh 1.00 0.00 0.00

15 Pengecatan bak fibre glass - 1.00 0.00 0.00

16 Pengetesan - 1.00 0.00 0.00

Jumlah III 0.00

HARGA PER 1 UNIT HU 0.00

HARGA PER 5 UNIT HU 0.00

SUB JUMLAH E 0.00

F. PEK. KONSTRUKSI KRAN UMUM (KU)

I PEKERJAAN KONSTRUKSI

1 Galian Tanah M3 1.10 An. TSN 6.1 0.00 0.00

2 Cerucuk dia. 8-10 P=4 m Btg 9.00 0.00

3 Urugan pasir t = 10 cm M3 0.44 An. TSN 6.11 0.00 0.00

4 Lantai kerja t = 5 cm M3 0.22 An. SN BT 6.4 0.00 0.00

5 Cor Beton Tumbuk untuk lantai camp 1:2:3 M3 0.18 An. SN BT 6.5 0.00 0.00

6 Plesteran lantai M2 2.00 An.SN. PS 6.13 0.00 0.00

7 Cor kolom tulangan praktis h = 80 cm M3 0.14 An. SN BT 6.5 0.00 0.00

8 Pek. Pembesian kg 8.57 Anls. SP.I 0.00 0.00

9 Plesteran kolom M2 1.37 An.SN. PS 6.13 0.00 0.00

10 Cor saluran pembuang + tanggul M3 0.25 An. SN BT 6.5 0.00 0.00

11 Plesteran saluran pembuang + tanggul M2 4.20 An.SN. PS 6.13 0.00 0.00

Jumlah I 0.00

II PEKERJAAN ACCESSORIES

1 Klem sadel dia. 2 x 3/4" Bh 1.00 0.00 0.00

2 Valve Socket PVC dia. 3/4" Bh 1.00 0.00 0.00

3 Pipa PVC dia. 3/4" Bh 6.00 0.00 0.00

4 Reducer GIP dia. 3/4" x 1/2" M' 1.00 0.00 0.00

5 Elbow GIP dia. 1/2" M' 2.00 0.00 0.00

6 Pipa GIP dia. 1/2" Bh 4.00 0.00 0.006 Pipa GIP dia. 1/2" Bh 4.00 0.00 0.00

7 Tee GIP dia. 1/2" x 1/2" Bh 1.00 0.00 0.00

8 Ball kran dia. 1/2" Bh 2.00 0.00 0.00

9 Elbow PVC dia. 3/4" Bh 1.00 0.00 0.00

10 Lem PVC Bh 1.00 0.00 0.00

11 Isolatif Roll 2.00 0.00 0.00

12 Pocet socket drat dalam dia. 3/4" Bh 1.00 0.00 0.00

13 All socket drat GIP dia. 1/2" Bh 2.00 0.00 0.00

Jumlah II 0.00

HARGA PER 1 UNIT KU 0.00

HARGA PER 2 UNIT KU 0.00

SUB JUMLAH F 0.00

G. PEKERJAAN LAIN-LAIN

1 Pengetesan Pipa Lsm 1.00 0.00 0.00

Jumlah I 0.00

SUB JUMLAH G 0.00

JUMLAH A + B + C + D + E + F 0.00

Tempat, Tanggal, Bulan dan tahun

PT / CV............................

NAMA LENGKAPJabatanJabatan

DAFTAR HARGA UPAH DAN BAHAN

KEGIATAN : PENYEDIAAN SARANA DAN PRASARANA AIR MINUM BAGI MASYARAKAT BERPENGHASILAN RENDAH

PEKERJAAN : PEMBANGUNAN SARANA PENYEDIAAN AIR BERSIH

LOKASI : DESA SEGOLER KEC. TEBAS KAB. SAMBAS

SUMBER BIAYA : DAK SHARING DAU

TAHUN ANGGARAN : 2012

No U R A I A N S A T U A N

1 2 3

I UPAH

1 Pekerja tidak terlatih Orang/Hari Rp 0.00

2 Pekerja terlatih Orang/Hari Rp 0.00

3 Tukang Kayu / Semen Orang/Hari Rp 0.00

4 Tukang Batu Orang/Hari Rp 0.00

5 Tukang Besi Orang/Hari Rp 0.00

6 Tukang Pipa Orang/Hari Rp 0.00

7 Tukang Cat Orang/Hari Rp 0.00

8 Mandor Orang/Hari Rp 0.00

9 Kepala Tukang Orang/Hari Rp 0.00

II BAHAN

1 Pasir Urug m3 Rp 0.00

2 Pasir Beton m3 Rp 0.00

3 Pasir Pasang m3 Rp 0.00

4 Split beton 0,5 m3 Rp 0.00

5 Batu kali/Pecah 5/7 m3 Rp 0.00

6 Batu kali/Pecah 10/15 m3 Rp 0.00

7 Batu kali/Pecah 3/5 m3 Rp 0.00

8 Batu kali/Pecah 2/3 m3 Rp 0.00

9 Batu kali/Pecah 1/2 m3 Rp 0.00

10 Sirtu / Kerikil Kotor m3 Rp 0.00

11 Portland Cement (SII - 0013 atau sederajat) Zak Rp 0.00

12 Aspal Kg Rp 0.00

13 Solar ltr Rp 0.00

14 Teer Kg Rp 0.00

15 Kayu Belian Ketam 8/8 m3 Rp 0.00

16 Kayu Belian Ketam 12/12 m3 Rp 0.00

17 Kayu Belian Ketam10/10 m3 Rp 0.00

18 Papan Belian Tbl. 2 cm m3 Rp 0.00

19 Kayu Belian tdk ketam m3 Rp 0.00

20 Kayu Klas I 8/8 m3 Rp 0.00

21 Papan Kayu Kls.III m3 Rp 0.00

22 Kayu Klas III (rata-rata) m3 Rp 0.00

23 Kayu 5/7 m3 Rp 0.00

24 Kayu Klas. II m3 Rp 0.00

25 Kayu Bulat Dia. 8 - 10 cm Btg Rp 0.00

26 Paku Campur Kg Rp 0.00

27 Paku Jembatan Kg Rp 0.00

28 Besi Beugel Btg Rp 0.00

29 Bataco uk. 6 x 20 x 40 Buah Rp 0.00

30 Besi beton dia. 8 mm (polos) Kg Rp 0.00

31 Cat Dasar Kg Rp 0.00

32 Cat Kilat ( Anti Corosif ) Kg Rp 0.00

33 Minyak Cat Ltr Rp 0.00

34 Cat Tembok Ltr Rp 0.00

35 Amplas besi Lbr Rp 0.00

36 Kawat Duri Kg Rp 0.00

37 Kawat Ikat beton Kg Rp 0.00

38 Baut 5/8'- 25 cm Buah Rp 0.00

HARGA SATUAN

4

No U R A I A N S A T U A N

1 2 3

B PIPA

1 Pipa GIP Ø 6" Meter Rp 0.00

2 Pipa GIP Ø 4" Meter Rp 0.00

3 Pipa GIP Ø 3" Meter Rp 0.00

4 Pipa GIP Ø 2" Meter Rp 0.00

5 Pipa GIP Ø 1" Meter Rp 0.00

6 Pipa PVC Ø 6" ( SNI ) Meter Rp 0.00

7 Pipa PVC Ø 4" ( SNI ) Meter Rp 0.00

8 Pipa PVC Ø 3" ( SNI ) Meter Rp 0.00

9 Pipa PVC Ø 2" ( SNI ) Meter Rp 0.00

10 Pipa PVC Ø 1" ( SNI ) Meter Rp 0.00

C ACCESSORIES PIPA

1 All Flanged Gate Valve Ø 6 " Bh Rp 0.00

2 All Flanged Gate Valve Ø 4 " Bh Rp 0.00

3 All Flanged Gate Valve Ø 3 " Bh Rp 0.00

4 All Flanged Gate Valve Ø 2 " Bh Rp 0.00

5 All Flanged Bend GIP Ø 6 " x 90 derajat Bh Rp 0.00

6 All Flanged Bend GIP Ø 6 " x 45 derajat Bh Rp 0.00

7 All Flanged Bend GIP Ø 6 " x 22.5 derajat Bh Rp 0.00

8 All Flanged Bend GIP Ø 4 " x 90 derajat Bh Rp 0.00

9 All Flanged Bend GIP Ø 4 " x 45 derajat Bh Rp 0.00

10 All Flanged Bend GIP Ø 4 " x 22.5 derajat Bh Rp 0.00

11 All Flanged Bend GIP Ø 3 " x 90 derajat Bh Rp 0.00

12 All Flanged Bend GIP Ø 3 " x 45 derajat Bh Rp 0.00

13 All Flanged Bend GIP Ø 3 " x 22.5 derajat Bh Rp 0.00

14 All Flanged Bend GIP Ø 2 " x 90 derajat Bh Rp 0.00

15 All Flanged Bend GIP Ø 2 " x 45 derajat Bh Rp 0.00

16 All Flanged Bend GIP Ø 2 " x 22.5 derajat Bh Rp 0.00

17 All Socket Bend PVC Ø 6 " x 90 derajat Bh Rp 0.00

18 All Socket Bend PVC Ø 6 " x 45 derajat Bh Rp 0.00

19 All Socket Bend PVC Ø 6 " x 22.5 derajat Bh Rp 0.00

20 All Socket Bend PVC Ø 4 " x 90 derajat Bh Rp 0.00

21 All Socket Bend PVC Ø 4 " x 45 derajat Bh Rp 0.00

22 All Socket Bend PVC Ø 4 " x 22.5 derajat Bh Rp 0.00

23 All Socket Bend PVC Ø 3 " x 90 derajat Bh Rp 0.00

24 All Socket Bend PVC Ø 3 " x 45 derajat Bh Rp 0.00

25 All Socket Bend PVC Ø 3 " x 22.5 derajat Bh Rp 0.00

26 All Socket Bend PVC Ø 2 " x 90 derajat Bh Rp 0.00

27 All Socket Bend PVC Ø 2 " x 45 derajat Bh Rp 0.00

28 All Socket Bend PVC Ø 2 " x 22.5 derajat Bh Rp 0.00

29 All Socket TEE PVC Ø 6 " X 4 " Bh Rp 0.00

30 All Socket TEE PVC Ø 6 " X 4 " Bh Rp 0.00

31 All Socket TEE PVC Ø 6 " X 4 " Bh Rp 0.00

32 All Socket TEE PVC Ø 6 " X 2 " Bh Rp 0.00

33 All Socket TEE PVC Ø 4 " X 4 " Bh Rp 0.00

34 All Socket TEE PVC Ø 4 " X 3 " Bh Rp 0.00

35 All Socket TEE PVC Ø 3" X 3 " Bh Rp 0.00

36 All Socket TEE PVC Ø 3 " X 2 " Bh Rp 0.00

37 All Socket TEE PVC Ø 2 " X 2 " Bh Rp 0.00

38 Flanged Spigot PVC Ø 6 " Bh Rp 0.00

39 Flanged Spigot PVC Ø 4 " Bh Rp 0.00

40 Flanged Spigot PVC Ø 3 " Bh Rp 0.00

41 Flanged Spigot PVC Ø 2 " Bh Rp 0.00

42 Blank Flanged Ø 6 " Bh Rp 0.00

43 Blank Flanged Ø 4 " Bh Rp 0.00

44 Blank Flanged Ø 3 " Bh Rp 0.00

45 Blank Flanged Ø 2 " Bh Rp 0.00

46 All Flanged Tee GIP Ø 6 " Bh Rp 0.00

HARGA SATUAN

4

No U R A I A N S A T U A N HARGA SATUAN

1 2 3 4

47 All Flanged Tee GIP Ø 4 " Bh Rp 0.00

48 All Flanged Tee GIP Ø 3 " Bh Rp 0.00

49 All Flanged Tee GIP Ø 2 " Bh Rp 0.00

50 Air Valve Ø 4 " Bh Rp 0.00

51 Air Valve Ø 3 " Bh Rp 0.00

52 Air Valve Ø 2 " Bh Rp 0.00

53 Air Valve Ø 1 " Bh Rp 0.00

54 DOP PVC Ø 6 mm Bh Rp 0.00

55 DOP PVC Ø 4 mm Bh Rp 0.00

56 DOP PVC Ø 3 mm Bh Rp 0.00

57 DOP PVC Ø 2 mm Bh Rp 0.00

58 Solvent Cement Liter Rp 0.00

59 All Socket Reducer PVC Ø 6 " x 4" Bh Rp 0.00

60 All Socket Reducer PVC Ø 4 " x 3" Bh Rp 0.00

61 All Socket Reducer PVC Ø 3 " x 2" Bh Rp 0.00

62 All Flanged Reducer GIP Ø 6 " x 4" Bh Rp 0.00

63 All Flanged Reducer GIP Ø 6 " x 3" Bh Rp 0.00

64 All Flanged Reducer GIP Ø 6 " x 2" Bh Rp 0.00

65 All Flanged Reducer GIP Ø 4 " x 3" Bh Rp 0.00

66 All Flanged Reducer GIP Ø 4 " x 2" Bh Rp 0.00

67 All Flanged Reducer GIP Ø 2 " x 1" Bh Rp 0.00

68 All Flanged Reducer GIP Ø 3 " x 2" Bh Rp 0.00

69 All Flanged Reducer GIP Ø 3 " x 1" Bh Rp 0.00

70 All Flanged Reducer GIP Ø 2 " x 1" Bh Rp 0.00

71 Packing Karet Ø 6 " Bh Rp 0.00

72 Packing Karet Ø 4 " Bh Rp 0.00

73 Packing Karet Ø 3 " Bh Rp 0.00

74 Packing Karet Ø 2 " Bh Rp 0.00

75 Baut 5/8 - 25 cm Bh Rp 0.00

76 Reducer GIP dia. 3/4" x 1/2" Bh Rp 0.00

77 Elbow GIP dia. 1/2 " Bh Rp 0.00

78 Tee GIP dia. 1/2" x 1/2" Bh Rp 0.00

79 All Socket Drat GIP dia. 1/2" Bh Rp 0.00

80 Pipa GIP Dia. 3/4" Bh Rp 0.00

81 Pipa GIP Dia. 1/2" Bh Rp 0.00

82 Elbow Drat GIP Dia. 3/4" Bh Rp 0.00

83 Socket Drat GIP Dia. 3/4" Bh Rp 0.00

84 Elbow PVC Dia. 3/4" Bh Rp 0.00

85 Pipa penguras bak + Dop dia. 3/4 Bh Rp 0.00

86 Ball Kran Dia. 3/4" Bh Rp 0.00

87 Ball Kran Dia. 1/2" Bh Rp 0.00

88 Pipa PVC Dia. 3/4" Bh Rp 0.00

89 Valve Socket PVC Dia. 3/4" Bh Rp 0.00

90 Pocet Socket PVC Dia. 1/2 " Bh Rp 0.00

91 Lem PVC Bh Rp 0.00

92 Isosalatif Bh Rp 0.00

93 Focet socket drat dalam dia. 3/4 Bh Rp 0.00

94 Klem Sadel Dia. 3 x 3/4" Bh Rp 0.00

95 Klem Sadle dia. 2 x 3/4 " Bh Rp 0.00

96 Pengadaan Bak Fibre Glass Kap. 2,0 M3 Bh Rp 0.00

97 Kran air 3/4" Bh Rp 0.00

98 Pelampung Air Bh Rp 0.00

99 Alat bantu - Rp 0.00

Tempat, Tanggal, Bulan dan tahun

PT / CV............................

NAMA LENGKAP

Jabatan

DAFTAR ANALISA PEKERJAAN

KEGIATAN : PENGEMBANGAN DAN PENGELOLAAN AIR BERSIH

PEKERJAAN : PEMBANGUNAN SARANA PENYEDIAAN AIR BERSIH

LOKASI : DESA SEGOLER KEC. TEBAS KAB. SAMBAS

SUMBER BIAYA : DAK SHARING DAU

TAHUN ANGGARAN : 2012

HARGA HARGA HARGA

NO URAIAN PEKERJAAN SATUAN UPAH BAHAN

(Rp.) (Rp.) (Rp.)

1 2 3 4 5

Pek. Pembuatan Bak Gate Valve

a. Dia. 100 mm (70 x 70 x 90 cm)

0.343 M3 Galian Tanah - - - 0.00

0.378 M3 Beton 1 : 2 : 3 - - - 0.00

0.378 M3 Bekisting - - 0.00

18.900 Kg Tulangan Praktis - - 0.00

0.098 M3 Urugan Pasir - - - 0.00

1.000 Set Besi Siku Cover box - - - 0.00

8.000 Btg Cerucuk Dia. 8-10 cm - - - 0.00

- - 0.00

b. Dia. 75 mm (70 x 70 x 80 cm)

0.294 M3 Galian Tanah - - - 0.00

0.336 M3 Beton 1 : 2 : 3 - - - 0.00

0.336 M3 Bekisting - - 0.00

16.800 Kg Tulangan Praktis - - 0.00

0.098 M3 Urugan Pasir - - - 0.00

1.000 Set Besi Siku Cover box - - - 0.00

8.000 Btg Cerucuk Dia. 8-10 cm - - - 0.00

- - 0.00

(Rp.)

6

JUMLAH

HARGA

KEGIATAN :

PEKERJAAN : PEMBANGUNAN SARANA PENYEDIAAN AIR BERSIH

LOKASI : DESA SEGOLER KEC. TEBAS KAB. SAMBAS

SUMBER BIAYA : DAK SHARING DAU

TAHUN ANGGARAN : 2012

Pekerjaan PERSIAPAN

1 An. TSN 6.8 : 1 m3 Membersihkan lapangan dan peralatan

1 2 3 4 5 6

0.100 OH Pekerja - -0.050 OH Mandor - -

-

2 An. TSN 6.4 : Pengukuran & Pemasangan Bouplank

1 2 3 4 5 6

Upah Kerja :

0.1000 OH Pekerja - -0.1000 OH Tukang Kayu - -0.0100 OH Kepala Tukang Batu - -0.0050 OH Mandor - -

Bahan :

0.0120 m3 Kayu 5/7 - -0.0200 Kg Paku biasa - -

0.0070 m3 Kayu papan - -

-

3 An. TSN 6.3 : Pagar dari kawat berduri tinggi 1,8 M

1 2 3 4 5 6

Upah Kerja :

0.3000 OH Pekerja - -0.2000 OH Tukang Kayu - -0.0200 OH Kepala Tukang Batu - -0.0200 OH Mandor - -

Bahan :

1.0000 Btg Pipa GIP 2" - -2.0000 Kg PC - -

25.0000 Kg Kawat duri - -0.0050 m3 Pasir beton - -0.0090 m3 Koral beton - -0.0600 Kg Paku - -

-

DAFTAR ANALISA PEKERJAAN

PENYEDIAAN SARANA DAN PRASARANA AIR MINUM BAGI MASYARAKAT

BERPENGHASILAN RENDAH

HARGA SATUAN

(Rp.)

JUMLAH HARGA

(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

SATUAN URAIANNO KOEFISIEN

Pekerjaan GALIAN & TIMBUNAN PIPA

4 An. TSN 6.1 : 1 M3 Galian Tanah :

1 2 3 4 5 6

0.4000 OH Pekerja - -0.0400 OH Mandor - -

-

1 m' Galian Pipa Ǿ 50 - 75 mm (0,250 x 0,70) x 1,00 = 0,175 m3 x -

1 m' Galian Pipa Ǿ 100 - 200 mm (0,375 x 1,00) x 1,00 = 0,375 m3 x -

1 m' Galian Pipa Ǿ 250 - 300 mm (0,45 x 1,30) x 1,00 = 0,585 m3 x -

1 m' Galian Pipa Ǿ 350 - 400 mm (0,50 x 1,50) x 1,00 = 0,750 m3 x -

5 An. TSN 6.6 : 1 M3 Galian Tanah Lumpur :

1 2 3 4 5 6

0.8230 OH Pekerja - -0.0830 OH Mandor - -

-

6 An. TSN 6.4 : 1 M3 Galian Tanah Keras :

1 2 3 4 5 6

0.6250 OH Pekerja - -0.0620 OH Mandor - -

-

6 An. TSN 6.6 : 1 M3 Galian Tanah Cadas berbatu :

1 2 3 4 5 6

1.2500 OH Pekerja - -0.1250 OH Mandor - -

-

1 m' Galian Pipa Ǿ 50 - 75 mm (0,250 x 0,70) x 1,00 = 0,175 m3 x An. TSN 6.6.1 -

1 m' Galian Pipa Ǿ 100 - 200 mm (0,375 x 1,00) x 1,00 = 0,375 m3 x An. TSN 6.6.2 -

1 m' Galian Pipa Ǿ 250 - 300 mm (0,45 x 1,30) x 1,00 = 0,585 m3 x -

1 m' Galian Pipa Ǿ 350 - 400 mm (0,50 x 1,50) x 1,00 = 0,750 m3 x -

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

SATUAN URAIANNO KOEFISIEN

NO KOEFISIEN SATUAN URAIAN

7 An. TSN 6.8 : 1 M3 Buang Tanah Galian sejauh 150 m :

1 2 3 4 5 6

0.5160 OH Pekerja - -0.0500 OH Mandor - -

-

Total Galian tanah dibuang ( TSN 6.1 + TSN 6.8 ) ................ -

8 An. TSN 6.15 : 1 M3 Timbunan Sirtu/Krikil Kotor dipadatkan dgn Gilas :

1 2 3 4 5 6

1.2000 m3 Sirtu / Kerikil Kotor - -0.2500 OH Pekerja - -0.0250 OH Mandor - -0.0001 OH Biaya Gilas - -

-

9 An. W4 Biaya Gilas

1 2 3 4 5 6

25 hr Sewa Mesin Gilas - -25 hr Masinis - -30 hr Penjaga Malam - -

500 ltr Minyak Solar - -15 ltr Minyak Pelumas - -

4 ltr Minyak Gardan - -5 ltr Minyak Gemuk - -

Ls - Pemeliharaan - -

-

10 An. TSN 6.9 : 1 M3 Timbunan Tanah :

1 2 3 4 5 6

0.1920 OH Pekerja - -0.0190 OH Mandor - -

-

1 m' Timbunan Tanah Pipa Ǿ 50 - 75 mm (0,25 x 0,45) x 1,00 = An. TSN 6.9.1 -

1 m' Timbunan Tanah Pipa Ǿ 100 - 200 mm (0,375 x 0,625) x 1,00 = An. TSN 6.9.12 -

1 m' Timbunan Tanah Pipa Ǿ 250 - 300 mm (0,45 x 0,85) x 1,00 = -

1 m' Timbunan Tanah Pipa Ǿ 350 - 400 mm (0,50 x 1,00) x 1,00 = -

NO KOEFISIEN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

SATUAN URAIAN

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIAN

11 An. TSN 6.11 : 1 M3 Timbunan Pasir Urug dipadatkan :

1 2 3 4 5 6

1.200 m3 Pasir Urug - -0.300 OH Pekerja - -0.010 OH Mandor - -

Ls OH Alat bantu - -

-

1 m' Timbunan Pasir Pipa Ǿ 50 - 75 mm (0,25 x 0,25) - (3,14 x(0,075)2/4) x 1,00 = -

1 m' Timbunan Pasir Pipa Ǿ 100 - 200 mm (0,375 x 0,375) - (3,14 x (0,2)2/4) x 1,00 = -

1 m' Timbunan Pasir Pipa Ǿ 250 - 300 mm (0,45 x 0,45) - (3,14 x (0,3)2/4) x 1,00 = -

1 m' Timbunan Pasir Pipa Ǿ 350 - 400 mm (0,50 x 0,50) - (3,14 x (0,4)2/4) x 1,00 = -

Pekerjaan BATU KALI

12 An. SNBK 6.14 : 1 M3 Pasangan batu kosong :

1 2 3 4 5 6

1.200 m3 Batu Kali 10/15 cm - -0.780 OH Pekerja - -0.078 OH Mandor - -

-

13 An. SNBK 6.5 : 1 M3 Pasangan batu kali camp. 1 : 4

1 2 3 4 5 6

1.100 m3 Batu Kali - -136.000 Kg Semen Portland - -

0.522 m3 Pasir Pasang - -1.500 OH Pekerja - -0.600 OH Tukang batu - -0.060 OH Kepala Tukang - -0.075 OH Mandor - -

-

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

SATUAN URAIANNO KOEFISIEN

Pekerjaan BETON

14 An. SN BT 6.4 : 1 M3 Lantai Kerja - Beton Cor ( 1:3:5 ) :

1 2 3 4 5 6

218.000 Kg Portland Cement - -0.520 m3 Pasir Pasang - -0.870 m3 Koral beton - -1.650 OH Pekerja - -0.250 OH Tukang Batu - -0.025 OH Kepala Tukang - -0.080 OH Mandor - -

-

15 An. PF 6.33 : 1 M3 Bekisting Dinding Beton ( Plat Form/Cetakan ) :

1 2 3 4 5 6

0.030 m3 Kayu - -0.400 Kg Paku 2'-5' - -0.020 m3 Balok kayu - -0.350 lbr Plywood t = 4 mm - -3.000 bh Dolken Galam Ǿ 8-10/4 m - -0.200 ltr Minyak Bekisting - -4.000 bh Formie/Spacer - -0.320 OH Pekerja - -0.330 OH Tukang Batu - -0.033 OH Kepala Tukang - -0.006 OH Mandor - -

-

16 An. PF 6.32 : 1 M3 Bekisting Lantai/Atap Beton ( Plat Form/Cetakan ) :

1 2 3 4 5 6

0.040 m3 Kayu - -0.400 Kg Paku 2'-5' - -0.015 m3 Balok kayu - -0.350 lbr Plywood t = 4 mm - -6.000 bh Dolken Galam Ǿ 8-10/4 m - -0.200 ltr Minyak Bekisting - -6.000 bh Formie/Spacer - -0.320 OH Pekerja - -0.330 OH Tukang Batu - -0.033 OH Kepala Tukang - -0.006 OH Mandor - -

-

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

17 An. Supl. SN BT 6.4 1 m3 Lantai dasar - beton cor ( 1 : 3 : 5 )

( An. SN BT 6.4 + An. SN PF 6.33 ) Beton Cor + Bekisting Dinding Beton -

18 An. Supl. SN B 1 m3 Beton Cor camp. 1 : 3 : 5

( An. SN BT 6.4 + An. SN PF 6.32 ) Beton Cor + Bekisting Atap/Lantai -

19 An. SN BT 6.5 : 1 M3 Beton Cor camp. 1 : 2 : 3

1 2 3 4 5 6

336.000 Kg Portland Cement - -0.540 m3 Pasir Beton - -0.810 m3 Koral beton - -1.650 OH Pekerja - -0.250 OH Tukang Batu - -0.025 OH Kepala Tukang - -0.080 OH Mandor - -

-

20 Anls. G.41.a : 1 M3 Beton 1 Pc : 1,5 Ps : 2,5 Krl

1 2 3 4 5 6

Upah Kerja :

1.650 OH Pekerja - -0.250 OH Tukang Batu - -0.025 OH Kepala Tukang - -0.080 OH Mandor - -

Bahan :

400.000 Kg Portland Cement - -0.800 m3 Kerikil - -0.480 m3 Pasir Beton - -

-

21 Anls. SP.I : 1 Kg Pekerjaan Pembesian

1 2 3 4 5 6

Upah Kerja :

0.070 OH Pekerja - -0.070 OH Tukang Batu - -0.007 OH Kepala Tukang - -0.004 OH Mandor - -

Bahan :

1.050 Kg Besi Beton (polos/ulir) - -0.015 Kg Kawat Beton - -

-

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

22 Anls. B.1.d : 1 m2 Bekisting untuk lantai/atap

1 2 3 4 5 6

Upah Kerja :

0.660 OH Pekerja - -0.330 OH Tukang Kayu - -0.033 OH Kepala Tukang - -0.033 OH Mandor - -

Bahan :

0.040 m3 Kayu papan klas III - -0.400 Kg Paku - -0.015 m3 Balok kayu klas II - -0.350 Lbr Plywood tebal 4 mm - -6.000 Btg Dolken kayu galam - -

-

23 Anls. B.1.e : 1 m2 Bekisting untuk dinding

1 2 3 4 5 6

Upah Kerja :

0.660 OH Pekerja - -0.330 OH Tukang Kayu - -0.033 OH Kepala Tukang - -0.033 OH Mandor - -

Bahan :

0.030 m3 Kayu papan klas III - -0.400 Kg Paku - -0.020 m3 Balok kayu klas II - -0.350 Lbr Plywood tebal 4 mm - -3.000 Btg Dolken kayu galam - -4.000 Bh Formite/penjaga jarak - -

-

24 Anls. G.14 (Spl) : 1 m3 Pek. Beton Plat lantai/atap dg. Besi 110 kg

1 2 3 4 5 6

1.000 m3 Beton camp. 1 : 1,5 : 2,5 - -6.000 m2 Cetakan Beton Atap - -

110.000 Kg Besi Beton - -1.000 Ls Siram/Buka Bekisting - -

-

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

SATUAN URAIANNO KOEFISIEN

NO KOEFISIEN SATUAN URAIAN

25 Anls. G.41 (Spl) : 1 m3 Pek. Beton Bertulang camp 1 : 2 : 3

1 2 3 4 5 6

1.000 m3 Beton camp. 1 : 2 : 3 - -6.000 m2 Cetakan Beton Atap - -

110.000 Kg Besi Beton - -1.000 Ls Siram/Buka Bekisting - -

-

26 Anls. G.41 (Spl. V) : 1 m3 Pek. Beton dinding dg. Besi 110 kg

1 2 3 4 5 6

1.000 m3 Beton camp. 1 : 1,5 : 2,5 - -6.000 m2 Cetakan Beton Dinding - -

110.000 Kg Besi Beton - -1.000 Ls Siram/Buka Bekisting - -

-

27 An.SN. BTM 6.11 : 1 m2 Pasangan dinding batako 1/2 batu camp. 1 : 4

1 2 3 4 5 6

13.000 bh Batu bata - -11.500 kg Portland Cement - -

0.043 m3 Pasir Pasang - -0.320 OH Pekerja - -0.100 OH Tukang Batu - -0.010 OH Kepala Tukang - -0.015 OH Mandor - -

-

28 An.SN. PS 6.13 : 1 m2 Plesteran kedap air camp. 1 : 2 tebal 20 mm

1 2 3 4 5 6

14.280 kg Portland Cement - -0.023 m3 Pasir Pasang - -0.250 OH Pekerja - -0.200 OH Tukang Batu - -0.020 OH Kepala Tukang - -0.013 OH Mandor - -

-

NO KOEFISIEN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

SATUAN URAIAN

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIAN

29 An.SN. PS 6.15 : 1 m2 Plesteran kedap air camp. 1 : 4 tebal 20 mm

1 2 3 4 5 6

8.680 kg Portland Cement - -0.028 m3 Pasir Pasang - -0.250 OH Pekerja - -0.200 OH Tukang Batu - -0.020 OH Kepala Tukang - -0.013 OH Mandor - -

-

ANALISA TAKSIR PEMASANGAN PIPA PVC

33 An.Taksir : 6 m Pemasangan Pipa PVC Ǿ 50 mm :

1 2 3 4 5 6

0.200 OH Pekerja - -0.133 OH Tukang Pipa - -0.067 OH Mandor - -

Ls - Peralatan - -

Jumlah = -

1 m' Pemasangan Pipa PVC Ǿ 50 mm = 1/6 x -

34 An.Taksir : 6 m Pemasangan Pipa PVC Ǿ 75 mm :

1 2 3 4 5 6

0.250 OH Pekerja - -0.167 OH Tukang Pipa - -0.083 OH Mandor - -

Ls - Peralatan - -

Jumlah = -

1 m' Pemasangan Pipa PVC Ǿ 75 mm = 1/6 x -

35 An.Taksir : 6 m Pemasangan Pipa PVC Ǿ 100 mm :

1 2 3 4 5 6

0.300 OH Pekerja - -0.200 OH Tukang Pipa - -0.100 OH Mandor - -

Ls - Peralatan - -

Jumlah = -

1 m' Pemasangan Pipa PVC Ǿ 100 mm = 1/6 x -

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

SATUAN URAIANNO KOEFISIEN

NO KOEFISIEN SATUAN URAIAN

36 An.Taksir : 6 m Pemasangan Pipa PVC Ǿ 150 mm :

1 2 3 4 5 6

0.429 OH Pekerja - -0.286 OH Tukang Pipa - -0.143 OH Mandor - -

Ls - Peralatan - -

Jumlah = -

1 m' Pemasangan Pipa PVC Ǿ 150 mm = 1/6 x -

ANALISA TAKSIR PEMASANGAN PIPA STEEL/GIP

42 An.Taksir : 6 m Pemasangan Pipa Steel/GIP Ǿ 50 mm :

1 2 3 4 5 6

0.250 OH Pekerja - -0.167 OH Tukang Pipa - -0.083 OH Mandor - -0.100 - Peralatan (Tracker) - -

Jumlah = -

1 m' Pemasangan Pipa Steel/GIP Ǿ 50 mm = 1/6 x -

43 An.Taksir : 6 m Pemasangan Pipa Steel/GIP Ǿ 75 mm :

1 2 3 4 5 6

0.250 OH Pekerja - -0.167 OH Tukang Pipa - -0.083 OH Mandor - -0.200 - Peralatan (Tracker) - -

Jumlah = -

1 m' Pemasangan Pipa Steel/GIP Ǿ 75 mm = 1/6 x -

44 An.Taksir : 6 m Pemasangan Pipa Steel/GIP Ǿ 100 mm :

1 2 3 4 5 6

0.300 OH Pekerja - -0.200 OH Tukang Pipa - -0.100 OH Mandor - -0.200 - Peralatan (Tracker) - -

Jumlah = -

1 m' Pemasangan Pipa Steel/GIP Ǿ 100 mm = 1/6 x -

NO KOEFISIEN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

SATUAN URAIAN

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIAN

45 An.Taksir : 6 m Pemasangan Pipa Steel/GIP Ǿ 150 mm :

1 2 3 4 5 6

0.375 OH Pekerja - -0.250 OH Tukang Pipa - -0.125 OH Mandor - -0.200 - Peralatan (Tracker) - -

Jumlah = -

1 m' Pemasangan Pipa Steel/GIP Ǿ 150 mm = 1/6 x -

Pekerjaan PELAT & LAS

61 1 m Pengelasan Penuh Tebal = 3 mm

1 2 3 4 5 6

Peralatan :

Ls Sewa Mesin Las - -1,820.000 ltr Minyak Solar - -

10.000 ltr Oli - -Ls Biaya Operator - -Ls Transportasi Peralatan - -

-

Upah :

0.580 OH Pekerja - -0.290 OH Tukang Las - -0.188 OH Mandor - -0.011 OH Peralatan (Tracker) - -0.203 OH Kotak Kawat Las - -

-

62 1 m Pemotongan Plat Menggunakan Titik Tek. Tinggi t < 7 mm

1 2 3 4 5 6

0.250 OH Pekerja - -0.188 OH Tukang Las - -0.125 OH Mandor - -

0.108 Bh Isi tabung Elpiji @ 50 kg - -0.063 Bh Isi tabung zat asam @ 75 kg - -

-

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

SATUAN URAIANNO KOEFISIEN

63 An. 1cm Pengelasan dengan las listrik

1 2 3 4 5 6

0.040 Kg Kawat Las - -0.030 ltr Solar - -0.004 ltr Minyak Pelumas - -0.009 OH Pekerja - -0.009 OH Tukang Besi - -0.004 OH Kepala Tukang - -0.009 OH Mandor - -0.003 Hr Sewa Mesin Las - -

-

1 m Pengelasan Penuh -

Pekerjaan PENGECATAN :

64 An.K.23 : 100 m2 Mengecat :

1 2 3 4 5 6

5.000 OH Pekerja - -7.500 OH Tukang - -0.750 OH Kepala Tukang - -0.250 OH Mandor - -

Jumlah = -

1 m2 Pengecatan = 1/100 x -

65 Supl K.23a Cat Besi / Kilat :

1 2 3 4 5 6

2.000 Upah Mengecat - -0.283 Kg Cat Kilat - -

-

66 Supl K.23b Cat Tembok :

1 2 3 4 5 6

2.000 Upah Mengecat - -0.283 Kg Cat Tembok - -

-

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

SATUAN URAIAN

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

Pekerjaan KAYU :

67 An. BOW (E.1) dicicin dan dilancipkan (E.1)

1 2 3 4 5 6

0.100 OH Pekerja - -0.250 OH Tukang - -0.025 OH Kepala Tukang - -0.005 OH Mandor - -

-

68 An. BOW (E.1/Tiang) ada Tiang Balok Pemikul (E.1/Tiang)

1 2 3 4 5 6

0.600 OH Tukang - -0.060 OH Kepala Tukang - -

-

69 An. BOW (E.13/M') Menumbuk Tiang Tongkat di tanah lembek (dihitung yang masuk) E.13/M'

1 2 3 4 5 6

1.800 OH Pekerja - -0.040 OH Tukang - -0.004 OH Kepala Tukang - -0.043 OH Mandor - -

-

70 An. BOW (F.1/M3) Bahan, Keep, Gelegar Kayu Belian (F.1/M3)

1 2 3 4 5 6

1.800 OH Pekerja - -0.040 OH Tukang - -0.004 OH Kepala Tukang - -0.043 OH Mandor - -3.000 kg Paku - -1.100 m3 Kayu Belian - -

-

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIAN

HARGA SATUAN(Rp.)

JUMLAH HARGA(Rp.)

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

NO KOEFISIEN SATUAN URAIAN

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

71 1 m3 Pasang konstruksi kuda-kuda

1 2 3 4 5 6

4.000 OH Pekerja - -12.000 OH Tukang - -

1.200 OH Kepala Tukang - -0.200 OH Mandor - -0.800 kg Paku - -1.100 m3 Kayu klas II - -

15.000 kg Besi strip - -

-

72 An. BOW (E.4) Membuat Pen Lubang/Btg

1 2 3 4 5 6

0.600 OH Tukang - -0.060 OH Kepala Tukang - -

-

NO KOEFISIEN SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)

SATUAN URAIANHARGA SATUAN

(Rp.)JUMLAH HARGA

(Rp.)NO KOEFISIEN