Pages-from-2020-10-12_NMSU-NMDA ... - Facilities & Services

67
E E M M 95% PRE-FILTER 30% PRE-FILTER COOLING COIL CHWR CHWS RE-HEAT COIL HTWR HTWS SUPPLY AIR MAKE-UP AIR MIXED AIR RETURN AIR AFMS U102 EV-3-12 RELIEF AIR P-AHU-010 ONLY MECH. PENTHOUSE 1 NOT TO SCALE P-AHU-005,006, 010 CONTROL DIAGRAM (VAV) T VFD HS SD T VFD VFD VFD T DP DP H LS E E E M M 95% PRE-FILTER 30% PRE-FILTER COOLING COIL CHWR CHWS MIXED AIR RETURN AIR MAKE-UP AIR AFMS SUPPLY AIR RHC RHC ZONE SENSOR ZONE SENSOR HTWR HTWS HTWR HTWS VAV VAV T VFD HS SD 2 NOT TO SCALE P-AHU-007,009 CONTROL DIAGRAM (VAV) T VFD VFD VFD T T T DP DP DP LS SD H POSITION (% FLOW) SV/VALVE SETPOINT SPACE TEMPERATURE -2°F 0% 10% 20% 30% 40% -1°F 80% 50% 70% 60% 100% 90% +1°F +2°F DAMPER POSITION SUPPLY -3°F REHEAT VALVE POSITION 4 NONE SV TERMINAL UNIT WITH RE-HEAT CONTROL SCHEMATIC AIR HANDLING UNIT CONTROL POINTS - P-AHU-005,006,010 POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTES AIR HANDLING UNITS - P-AHU-005,006,010 RETURN AIR RELATIVE HUMIDITY 3 3 RETURN AIR DAMPER 3 3 6 PROVIDE WITH COMMAND AND STATUS MAKE-UP AIR FLOWRATE 3 3 PROVIDE POINT WITH ALARM SIGNAL MAKE-UP AIR DAMPER 3 3 6 PROVIDE WITH COMMAND AND STATUS MIXED AIR TEMPERATURE 3 3 FILTER DIFFERENTIAL PRESSURE 6 6 PROVIDE POINT WITH ALARM SIGNAL COOLING COIL CONTROL VALVE POSITION 3 3 COOLING COIL LEAVING AIR TEMPERATURE 3 3 RE-HEAT COIL CONTROL VALVE POSITION 3 3 LOW LIMIT DUCT STATIC PRESSURE 3 3 PROVIDE POINT WITH ALARM SIGNAL FAN START/STOP COMMAND 3 3 FAN SYSTEM FAULT 3 3 PROVIDE POINT WITH ALARM SIGNAL FAN VFD SPEED 3 3 6 FAN HOA STATUS 3 3 PROVIDE POINT WITH ALARM SIGNAL FAN INLET AIR FLOWRATE 3 3 PROVIDE TOTAL AIR FLOW CALCULATED SUPPLY AIR TEMPERATURE 3 3 PROVIDE HIGH AND LOW LIMIT ALARM HIGH LIMIT DUCT STATIC PRESSURE 3 3 PROVIDE POINT WITH ALARM SIGNAL SMOKE DETECTOR 3 3 PROVIDE POINT WITH ALARM SIGNAL ZONE THERMOSTAT 3 3 LN2 O2 SENSOR 1 1 PROVIDE POINT WITH ALARM SIGNAL EXHAUST VALVE FLOWRATE 2 2 EXHAUST VALVE DAMPER POSITION 2 2 UNIT HEATER - P-UH-001, 3 2 2 OVERALL POINTS 38 16 17 5 76 0 NOTES: AIR HANDLING UNITS SEQUENCE OF OPERATIONS (P-AHU-005, 006, 010) FAN OPERATION 1. EACH FAN MOTOR SHALL BE INDIVIDUALLY WIRED TO A FACTORY MOUNTED CONTROL PANEL CONTAINING A SINGLE VFD PER FAN. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE FAN SYSTEM CONTROLS ARE COMPATIBLE WITH THE BMS SYSTEM. 3. FAN SYSTEM CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER TO ASSURE SINGLE SOURCE RESPONSIBILITY FOR FAN VOLUME CONTROLS, AND SHALL REQUIRE ONLY AN INPUT CONTROL SIGNAL FROM THE CONTROLS CONTRACTOR FOR PROPER OPERATION OF THE SYSTEM. 4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT CONTROL PANEL. 5. THE BMS SHALL MONITOR THE FAN ARRAY CONTROL PANEL FOR A FAULT SIGNAL AND SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM. 6. RETURN AIR AND MAKE-UP AIR DAMPERS a. THE FANS SHALL START ONLY AFTER THE RETURN AIR DAMPER STATUS HAS PROVEN THE DAMPER IS OPEN. b. WHILE THE FANS ARE IN OPERATION, THE RETURN AIR AND MAKE-UP AIR DAMPER SHALL MODULATE TO MAINTAIN A CONSTANT MAKE-UP AIR FLOWRATE. c. MAKE-UP AIR DAMPER CLOSE WHEN UNIT IS OFF. 7 FAN SPEED CONTROL a. THE BMS SHALL MONITOR THE ZONE TEMPERATURE AND SHALL MODULATE THE SUPPLY FAN VFD SPEED TO MAINTAIN ZONE TEMPERATURE SETPOINT. b. THE SUPPLY FAN VFD SPEED SHALL NOT DROP BELOW 30% (ADJUSTABLE). c. BMS SHALL MONITOR FAN ARRAY CONTROLLER FOR A FAULT SIGNAL AND SEND AN ALARM. 8 AIRFLOW MEASUREMENT a. EACH FAN CUBE SHALL BE EQUIPPED FROM THE FACTORY WITH AIRFLOW MONITORING PROBES AND A FLOW MEASURING TRANSDUCER (EQUAL TO +/- 2% ACCURACY OR BETTER). THESE DEVICES SHALL BE FACTORY MOUNTED AND PRESSURE TUBING SHALL BE FACTORY ROUTED. b. CONTROLS CONTRACTOR SHALL CONNECT BMS TO THE FACTORY MOUNTED TRANSDUCERS AND PROGRAM AN ALGORITHM TO CALCULATE TOTAL AIRFLOW. ZONE TEMPERATURE CONTROL 1. THE COOLING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN 55°F COOLING COIL LEAVING AIR TEMPERATURE. 2. FAN SPEED AND RE-HEAT CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE. UNIT HEATER CONTROL 1. SPACE THERMOSTAT SHALL MONITOR SPACE TEMPERATURE AND ENABLE/DISABLE UNIT HEATER TO MAINTAIN SPACE TEMPERATURE ABOVE SETPOINT, 65°F (ADJUSTABLE). SAFETIES 1. SMOKE DETECTION - A SMOKE DETECTOR SHALL BE HARD WIRED TO THE MOTOR CONTROL CIRCUIT TO SHUTDOWN THE UNIT UPON DETECTION OF SMOKE AND SEND AN ALARM TO THE FIRE ALARM SYSTEM. 2. HIGH DUCT STATIC PRESSURE - A HIGH DUCT STATIC PRESSURE SENSOR SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF DUCT STATIC PRESSURE IN EXCESS OF SETPOINT. 3. LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE AIR HANDLING UNIT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT. MISCELLANEOUS 1. DIRTY FILTER - THE BMS SHALL MONITOR THE DIFFERENTIAL PRESSURE AT EACH FILTER SECTION AND SIGNAL AN ALARM WHEN DIFFERENTIAL PRESSURES EXCEED SETPOINT. P-AHU-005, 006 AND 010 SHALL BE DEACTIVATED WHEN FACILITY IS ON EMERGENCY POWER. AIR HANDLING UNITS SEQUENCE OF OPERATIONS (RTU-N1, RTU-N3) FAN OPERATION 1. EACH FAN MOTOR SHALL BE INDIVIDUALLY WIRED TO A FACTORY MOUNTED CONTROL PANEL CONTAINING A SINGLE VFD PER FAN. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE FAN SYSTEM CONTROLS ARE COMPATIBLE WITH THE BMS SYSTEM. 3. FAN SYSTEM CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER TO ASSURE SINGLE SOURCE RESPONSIBILITY FOR FAN VOLUME CONTROLS, AND SHALL REQUIRE ONLY AN INPUT CONTROL SIGNAL FROM THE CONTROLS CONTRACTOR FOR PROPER OPERATION OF THE SYSTEM. 4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT CONTROL PANEL. 5. THE BMS SHALL MONITOR THE FAN ARRAY CONTROL PANEL FOR A FAULT SIGNAL AND SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM. 6. RETURN AIR AND MAKE-UP AIR DAMPERS a. THE FANS SHALL START ONLY AFTER THE RETURN AIR DAMPER STATUS HAS PROVEN THE DAMPER IS OPEN. b. WHILE THE FANS ARE IN OPERATION, THE RETURN AIR AND MAKE-UP AIR DAMPER SHALL MODULATE TO MAINTAIN A CONSTANT MAKE-UP AIR FLOWRATE. c. MAKE-UP AIR DAMPER CLOSE WHEN UNIT IS OFF. 7. FAN SPEED CONTROL a. THE BMS SHALL MONITOR THE DUCT STATIC PRESSURE AND CONTROL FAN SPEED TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT. b. DUCT STATIC PRESSURE LOCATION AND SETPOINT SHALL BE DETERMINED BY CONTROLS CONTRACTOR. c. DUCT STATIC PRESSURE SETPOINT SHALL BE DETERMINED BY TAB. d. BMS SHALL MONITOR FAN ARRAY CONTROLLER FOR A FAULT SIGNAL AND SEND AN ALARM. e. BMS SHALL INCLUDE DUCT STATIC PRESSURE RESET CAPABILITY ALLOWING THE DUCT STATIC PRESSURE TO BE RESET BASED ON TERMINAL UNIT DAMPER POSITION. IF ALL TERMINAL UNITS IN THE SYSTEM HAVE A DAMPER POSITION LESS THAN 90% OPEN FOR A PERIOD OF 10 MINUTES, THE DISCHARGE STATIC PRESSURE SETPOINT SHALL LOWER 0.1" W.G., AND CONTINUE TO LOWER BY 0.1" W.G. EVERY 10 MINUTES UNTIL SUCH TIME THAT ANY OF THE TERMINAL UNIT PRIMARY DAMPERS OPENS 100%. IF TWO OR MORE TERMINAL UNIT PRIMARY DAMPERS ARE OPEN 100% FOR A PERIOD OF 10 MINUTES, THE DISCHARGE STATIC PRESSURE SETPOINT SHALL INCREASE BY 0.1" W.G. AND CONTINUE TO INCREASE BY 0.1" W.G. EVERY 10 MINUTES UNTIL SUCH TIME THAT ONLY ONE TERMINAL UNIT PRIMARY DAMPER IS OPEN 100% OR THE DISCHARGE STATIC PRESSURE SETPOINT HAS REACHED THE INITIAL SETPOINT DESCRIBED ABOVE. 8. AIRFLOW MEASUREMENT a. EACH FAN CUBE SHALL BE EQUIPPED FROM THE FACTORY WITH AIRFLOW MONITORING PROBES AND A FLOW MEASURING TRANSDUCER (EQUAL TO +/- 2% ACCURACY OR BETTER). THESE DEVICES SHALL BE FACTORY MOUNTED AND PRESSURE TUBING SHALL BE FACTORY ROUTED. b. CONTROLS CONTRACTOR SHALL CONNECT BMS TO THE FACTORY MOUNTED TRANSDUCERS AND PROGRAM AN ALGORITHM TO CALCULATE TOTAL AIRFLOW. ZONE TEMPERATURE CONTROL 1. VERIFY QUANTITY AND LOCATION OF ALL ZONE THERMOSTATS AND RE-HEAT COILS. 2. THE COOLING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN THE COOLING COIL LEAVING AIR TEMPERATURE SETPOINT OF 55°F (ADJUSTABLE). 3. EACH TERMINAL UNIT DAMPER SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE, DOWN TO A MINIMUM POSITION OF 30% AIRFLOW. 4. UPON A ZONE TEMPERATURE DECREASING BELOW ZONE TEMPERATURE SETPOINT BY 1°F (ADJUSTABLE) THE ASSOCIATED RE-HEAT COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE. SAFETIES 1. SMOKE DETECTION - A SMOKE DETECTOR SHALL BE HARD WIRED TO THE MOTOR CONTROL CIRCUIT TO SHUTDOWN THE UNIT UPON DETECTION OF SMOKE AND SEND AN ALARM TO THE FIRE ALARM SYSTEM. 2. HIGH DUCT STATIC PRESSURE - A HIGH DUCT STATIC PRESSURE SENSOR SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF DUCT STATIC PRESSURE IN EXCESS OF SETPOINT. 3. LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE AIR HANDLING UNIT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT. MISCELLANEOUS 1. DIRTY FILTER - THE BMS SHALL MONITOR THE DIFFERENTIAL PRESSURE AT EACH FILTER SECTION AND SIGNAL AN ALARM WHEN DIFFERENTIAL PRESSURES EXCEED SETPOINT. P-AHU-007 AND 009 SHALL BE DEACTIVATED WHEN FACILITY IS ON EMERGENCY POWER. AIR HANDLING UNIT CONTROL POINTS - P-AHU-007,009 POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTES AIR HANDLING UNITS - P-AHU-007,009 RETURN AIR RELATIVE HUMIDITY 2 2 RETURN AIR DAMPER 2 2 4 PROVIDE WITH COMMAND AND STATUS MAKE-UP AIR FLOWRATE 2 2 PROVIDE POINT WITH ALARM SIGNAL MAKE-UP AIR DAMPER 2 2 4 PROVIDE WITH COMMAND AND STATUS MIXED AIR TEMPERATURE 2 2 FILTER DIFFERENTIAL PRESSURE 4 4 PROVIDE POINT WITH ALARM SIGNAL COOLING COIL CONTROL VALVE POSITION 2 2 COOLING COIL LEAVING AIR TEMPERATURE 2 2 LOW LIMIT DUCT STATIC PRESSURE 2 2 PROVIDE POINT WITH ALARM SIGNAL FAN START/STOP COMMAND 2 2 FAN SYSTEM FAULT 2 2 PROVIDE POINT WITH ALARM SIGNAL FAN VFD SPEED 2 2 4 FAN HOA STATUS 2 2 PROVIDE POINT WITH ALARM SIGNAL FAN INLET AIR FLOWRATE 2 2 PROVIDE TOTAL AIR FLOW CALCULATED SUPPLY AIR TEMPERATURE 2 2 PROVIDE HIGH AND LOW LIMIT ALARM HIGH LIMIT DUCT STATIC PRESSURE 2 2 PROVIDE POINT WITH ALARM SIGNAL SMOKE DETECTOR 2 2 PROVIDE POINT WITH ALARM SIGNAL DUCT STATIC PRESSURE 2 2 ZONE THERMOSTAT 21 21 TERMINAL UNIT SUPPLY AIR FLOWRATE 21 21 TERMINAL UNIT DAMPER POSITION 21 21 TERMINAL UNIT RE-HEAT COIL CONTROL VALVE 21 21 EXHAUST VALVE FLOWRATE 1 1 EXHAUST VALVE DAMPER POSITION 1 1 OVERALL POINTS 65 12 51 2 130 0 NOTES: 1 A 2 3 4 5 6 B C D E 1 2 3 4 5 6 NO T FOR CON STRUCTION PROJECT REVISIONS SHEET NO DRAWING NAME SEAL DATE REVIEWED BY PROJECT NO DRAWN BY 95% CONSTRUCTION DOCUMENTS 10/12/2020 4343 Pan American Fwy NE, Suite 239 Albuquerque, New Mexico 87107 USA 505.877.4499 main - 512.744.4444 fax www.eeace.com EEA Project No. #V20200032 CONSULTING ENGINEERS 10/9/202 0 6:16:51 PM NMSU NM DEPT OF AGRICULTURE NEW CONSTRUCTION / RENOVATION LAS CRUCES, NEW MEXICO M805 MECHANICAL CONTROL Approver 19 - 0056.001 Author

Transcript of Pages-from-2020-10-12_NMSU-NMDA ... - Facilities & Services

E E

M

M 95%

PR

E-F

ILT

ER

30%

PR

E-F

ILT

ER

CO

OLIN

G C

OIL

CH

WR

CH

WS

RE

-HE

AT

CO

IL

HT

WR

HT

WS

SUPPLYAIR

MAKE-UPAIR

MIXEDAIR

RETURNAIR

AFMS

U102

EV-3-12

RE

LIE

FA

IR

P-AHU-010 ONLY

MECH. PENTHOUSE

1 NOT TO SCALE

P-AHU-005,006, 010 CONTROL DIAGRAM (VAV)

T

VFD

HSSD

T

VFD

VFD

VFD

T

DPDP

H

LS

E

E

E

M

M 95%

PR

E-F

ILT

ER

30%

PR

E-F

ILT

ER

CO

OLIN

G C

OIL

CH

WR

CH

WS

MIXEDAIR

RETURNAIR

MAKE-UPAIR

AFMS

SUPPLYAIR

RH

C

RH

C

ZONE SENSOR

ZONE SENSOR

HT

WR

HT

WS

HT

WR

HT

WS

VAV

VAV

T

VFD

HSSD

2 NOT TO SCALE

P-AHU-007,009 CONTROL DIAGRAM (VAV)

T

VFD

VFD

VFD

T

T

T

DPDP

DP

LS

SD

H

POSITION

(% FLOW)

SV/VALVE

SETPOINT

SPACE TEMPERATURE

-2°F

0%

10%

20%

30%

40%

-1°F

80%

50%

70%

60%

100%

90%

+1°F +2°F

DAMPER

POSITION

SUPPLY

-3°F

REHEAT VALVE

POSITION

4 NONE

SV TERMINAL UNIT WITH RE-HEAT CONTROL SCHEMATIC

AIR HANDLING UNIT CONTROL POINTS - P-AHU-005,006,010POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESAIR HANDLING UNITS - P-AHU-005,006,010

RETURN AIR RELATIVE HUMIDITY 3 3

RETURN AIR DAMPER 3 3 6 PROVIDE WITH COMMAND AND STATUS

MAKE-UP AIR FLOWRATE 3 3 PROVIDE POINT WITH ALARM SIGNAL

MAKE-UP AIR DAMPER 3 3 6 PROVIDE WITH COMMAND AND STATUS

MIXED AIR TEMPERATURE 3 3

FILTER DIFFERENTIAL PRESSURE 6 6 PROVIDE POINT WITH ALARM SIGNAL

COOLING COIL CONTROL VALVE POSITION 3 3

COOLING COIL LEAVING AIR TEMPERATURE 3 3

RE-HEAT COIL CONTROL VALVE POSITION 3 3

LOW LIMIT DUCT STATIC PRESSURE 3 3 PROVIDE POINT WITH ALARM SIGNAL

FAN START/STOP COMMAND 3 3

FAN SYSTEM FAULT 3 3 PROVIDE POINT WITH ALARM SIGNAL

FAN VFD SPEED 3 3 6

FAN HOA STATUS 3 3 PROVIDE POINT WITH ALARM SIGNAL

FAN INLET AIR FLOWRATE 3 3 PROVIDE TOTAL AIR FLOW CALCULATED

SUPPLY AIR TEMPERATURE 3 3 PROVIDE HIGH AND LOW LIMIT ALARM

HIGH LIMIT DUCT STATIC PRESSURE 3 3 PROVIDE POINT WITH ALARM SIGNAL

SMOKE DETECTOR 3 3 PROVIDE POINT WITH ALARM SIGNAL

ZONE THERMOSTAT 3 3

LN2 O2 SENSOR 1 1 PROVIDE POINT WITH ALARM SIGNAL

EXHAUST VALVE FLOWRATE 2 2

EXHAUST VALVE DAMPER POSITION 2 2

UNIT HEATER - P-UH-001, 3 2 2

OVERALL POINTS 38 16 17 5 76 0

NOTES:

AIR HANDLING UNITS SEQUENCE OF OPERATIONS (P-AHU-005, 006, 010)

FAN OPERATION

1. EACH FAN MOTOR SHALL BE INDIVIDUALLY WIRED TO A FACTORY MOUNTED CONTROL PANEL CONTAINING A SINGLE VFD PER FAN.

2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE FAN SYSTEM CONTROLS ARE COMPATIBLE WITH THE BMS SYSTEM.

3. FAN SYSTEM CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER TO ASSURE SINGLE SOURCE RESPONSIBILITY FOR FAN VOLUME CONTROLS, AND SHALL REQUIRE ONLY AN INPUT CONTROL SIGNAL FROM THE CONTROLS CONTRACTOR FOR PROPER OPERATION OF THE SYSTEM.

4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT CONTROL PANEL.

5. THE BMS SHALL MONITOR THE FAN ARRAY CONTROL PANEL FOR A FAULT SIGNAL AND SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM.

6. RETURN AIR AND MAKE-UP AIR DAMPERS

a. THE FANS SHALL START ONLY AFTER THE RETURN AIR DAMPER STATUS HAS PROVEN THE DAMPER IS OPEN.

b. WHILE THE FANS ARE IN OPERATION, THE RETURN AIR AND MAKE-UP AIR DAMPER SHALL MODULATE TO MAINTAIN A CONSTANT MAKE-UP AIR FLOWRATE.

c. MAKE-UP AIR DAMPER CLOSE WHEN UNIT IS OFF.

7 FAN SPEED CONTROL

a. THE BMS SHALL MONITOR THE ZONE TEMPERATURE AND SHALL MODULATE THE SUPPLY FAN VFD SPEED TO MAINTAIN ZONE TEMPERATURE SETPOINT.

b. THE SUPPLY FAN VFD SPEED SHALL NOT DROP BELOW 30% (ADJUSTABLE).

c. BMS SHALL MONITOR FAN ARRAY CONTROLLER FOR A FAULT SIGNAL AND SEND AN ALARM.

8 AIRFLOW MEASUREMENT

a. EACH FAN CUBE SHALL BE EQUIPPED FROM THE FACTORY WITH AIRFLOW MONITORING PROBES AND A FLOW MEASURING TRANSDUCER (EQUAL TO +/- 2% ACCURACY OR BETTER). THESE DEVICES SHALL BE FACTORY MOUNTED AND PRESSURE TUBING SHALL BE FACTORY ROUTED.

b. CONTROLS CONTRACTOR SHALL CONNECT BMS TO THE FACTORY MOUNTED TRANSDUCERS AND PROGRAM AN ALGORITHM TO CALCULATE TOTAL AIRFLOW.

ZONE TEMPERATURE CONTROL

1. THE COOLING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN 55°F COOLING COIL LEAVING AIR TEMPERATURE.

2. FAN SPEED AND RE-HEAT CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE.

UNIT HEATER CONTROL

1. SPACE THERMOSTAT SHALL MONITOR SPACE TEMPERATURE AND ENABLE/DISABLE UNIT HEATER TO MAINTAIN SPACE TEMPERATURE ABOVE SETPOINT, 65°F (ADJUSTABLE).

SAFETIES

1. SMOKE DETECTION - A SMOKE DETECTOR SHALL BE HARD WIRED TO THE MOTOR CONTROL CIRCUIT TO SHUTDOWN THE UNIT UPON DETECTION OF SMOKE AND SEND AN ALARM TO THE FIRE ALARM SYSTEM.

2. HIGH DUCT STATIC PRESSURE - A HIGH DUCT STATIC PRESSURE SENSOR SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF DUCT STATIC PRESSURE IN EXCESS OF SETPOINT.

3. LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE AIR HANDLING UNIT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT.

MISCELLANEOUS

1. DIRTY FILTER - THE BMS SHALL MONITOR THE DIFFERENTIAL PRESSURE AT EACH FILTER SECTION AND SIGNAL AN ALARM WHEN DIFFERENTIAL PRESSURES EXCEED SETPOINT.

P-AHU-005, 006 AND 010 SHALL BE DEACTIVATED WHEN FACILITY IS ON EMERGENCY POWER.

AIR HANDLING UNITS SEQUENCE OF OPERATIONS (RTU-N1, RTU-N3)

FAN OPERATION

1. EACH FAN MOTOR SHALL BE INDIVIDUALLY WIRED TO A FACTORY MOUNTED CONTROL PANEL CONTAINING A SINGLE VFD PER FAN.

2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE FAN SYSTEM CONTROLS ARE COMPATIBLE WITH THE BMS SYSTEM.

3. FAN SYSTEM CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER TO ASSURE SINGLE SOURCE RESPONSIBILITY FOR FAN VOLUME CONTROLS, AND SHALL REQUIRE ONLY AN INPUT CONTROL SIGNAL FROM THE CONTROLS CONTRACTOR FOR PROPER OPERATION OF THE SYSTEM.

4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT CONTROL PANEL.

5. THE BMS SHALL MONITOR THE FAN ARRAY CONTROL PANEL FOR A FAULT SIGNAL AND SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM.

6. RETURN AIR AND MAKE-UP AIR DAMPERS

a. THE FANS SHALL START ONLY AFTER THE RETURN AIR DAMPER STATUS HAS PROVEN THE DAMPER IS OPEN.

b. WHILE THE FANS ARE IN OPERATION, THE RETURN AIR AND MAKE-UP AIR DAMPER SHALL MODULATE TO MAINTAIN A CONSTANT MAKE-UP AIR FLOWRATE.

c. MAKE-UP AIR DAMPER CLOSE WHEN UNIT IS OFF.

7. FAN SPEED CONTROL

a. THE BMS SHALL MONITOR THE DUCT STATIC PRESSURE AND CONTROL FAN SPEED TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT.

b. DUCT STATIC PRESSURE LOCATION AND SETPOINT SHALL BE DETERMINED BY CONTROLS CONTRACTOR.

c. DUCT STATIC PRESSURE SETPOINT SHALL BE DETERMINED BY TAB.

d. BMS SHALL MONITOR FAN ARRAY CONTROLLER FOR A FAULT SIGNAL AND SEND AN ALARM.

e. BMS SHALL INCLUDE DUCT STATIC PRESSURE RESET CAPABILITY ALLOWING THE DUCT STATIC PRESSURE TO BE RESET BASED ON TERMINAL UNIT DAMPER POSITION. IF ALL TERMINAL UNITS IN THE SYSTEM HAVE A DAMPER POSITION LESS THAN 90% OPEN FOR A PERIOD OF 10 MINUTES, THE DISCHARGE STATIC PRESSURE SETPOINT SHALL LOWER 0.1" W.G., AND CONTINUE TO LOWER BY 0.1" W.G. EVERY 10 MINUTES UNTIL SUCH TIME THAT ANY OF THE TERMINAL UNIT PRIMARY DAMPERS OPENS 100%. IF TWO OR MORE TERMINAL UNIT PRIMARY DAMPERS ARE OPEN 100% FOR A PERIOD OF 10 MINUTES, THE DISCHARGE STATIC PRESSURE SETPOINT SHALL INCREASE BY 0.1" W.G. AND CONTINUE TO INCREASE BY 0.1" W.G. EVERY 10 MINUTES UNTIL SUCH TIME THAT ONLY ONE TERMINAL UNIT PRIMARY DAMPER IS OPEN 100% OR THE DISCHARGE STATIC PRESSURE SETPOINT HAS REACHED THE INITIAL SETPOINT DESCRIBED ABOVE.

8. AIRFLOW MEASUREMENT

a. EACH FAN CUBE SHALL BE EQUIPPED FROM THE FACTORY WITH AIRFLOW MONITORING PROBES AND A FLOW MEASURING TRANSDUCER (EQUAL TO +/- 2% ACCURACY OR BETTER). THESE DEVICES SHALL BE FACTORY MOUNTED AND PRESSURE TUBING SHALL BE FACTORY ROUTED.

b. CONTROLS CONTRACTOR SHALL CONNECT BMS TO THE FACTORY MOUNTED TRANSDUCERS AND PROGRAM AN ALGORITHM TO CALCULATE TOTAL AIRFLOW.

ZONE TEMPERATURE CONTROL

1. VERIFY QUANTITY AND LOCATION OF ALL ZONE THERMOSTATS AND RE-HEAT COILS.

2. THE COOLING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN THE COOLING COIL LEAVING AIR TEMPERATURE SETPOINT OF 55°F (ADJUSTABLE).

3. EACH TERMINAL UNIT DAMPER SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE, DOWN TO A MINIMUM POSITION OF 30% AIRFLOW.

4. UPON A ZONE TEMPERATURE DECREASING BELOW ZONE TEMPERATURE SETPOINT BY 1°F (ADJUSTABLE) THE ASSOCIATED RE-HEAT COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE.

SAFETIES

1. SMOKE DETECTION - A SMOKE DETECTOR SHALL BE HARD WIRED TO THE MOTOR CONTROL CIRCUIT TO SHUTDOWN THE UNIT UPON DETECTION OF SMOKE AND SEND AN ALARM TO THE FIRE ALARM SYSTEM.

2. HIGH DUCT STATIC PRESSURE - A HIGH DUCT STATIC PRESSURE SENSOR SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF DUCT STATIC PRESSURE IN EXCESS OF SETPOINT.

3. LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE AIR HANDLING UNIT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT.

MISCELLANEOUS

1. DIRTY FILTER - THE BMS SHALL MONITOR THE DIFFERENTIAL PRESSURE AT EACH FILTER SECTION AND SIGNAL AN ALARM WHEN DIFFERENTIAL PRESSURES EXCEED SETPOINT.

P-AHU-007 AND 009 SHALL BE DEACTIVATED WHEN FACILITY IS ON EMERGENCY POWER.

AIR HANDLING UNIT CONTROL POINTS - P-AHU-007,009POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESAIR HANDLING UNITS - P-AHU-007,009

RETURN AIR RELATIVE HUMIDITY 2 2

RETURN AIR DAMPER 2 2 4 PROVIDE WITH COMMAND AND STATUS

MAKE-UP AIR FLOWRATE 2 2 PROVIDE POINT WITH ALARM SIGNAL

MAKE-UP AIR DAMPER 2 2 4 PROVIDE WITH COMMAND AND STATUS

MIXED AIR TEMPERATURE 2 2

FILTER DIFFERENTIAL PRESSURE 4 4 PROVIDE POINT WITH ALARM SIGNAL

COOLING COIL CONTROL VALVE POSITION 2 2

COOLING COIL LEAVING AIR TEMPERATURE 2 2

LOW LIMIT DUCT STATIC PRESSURE 2 2 PROVIDE POINT WITH ALARM SIGNAL

FAN START/STOP COMMAND 2 2

FAN SYSTEM FAULT 2 2 PROVIDE POINT WITH ALARM SIGNAL

FAN VFD SPEED 2 2 4

FAN HOA STATUS 2 2 PROVIDE POINT WITH ALARM SIGNAL

FAN INLET AIR FLOWRATE 2 2 PROVIDE TOTAL AIR FLOW CALCULATED

SUPPLY AIR TEMPERATURE 2 2 PROVIDE HIGH AND LOW LIMIT ALARM

HIGH LIMIT DUCT STATIC PRESSURE 2 2 PROVIDE POINT WITH ALARM SIGNAL

SMOKE DETECTOR 2 2 PROVIDE POINT WITH ALARM SIGNAL

DUCT STATIC PRESSURE 2 2

ZONE THERMOSTAT 21 21

TERMINAL UNIT SUPPLY AIR FLOWRATE 21 21

TERMINAL UNIT DAMPER POSITION 21 21

TERMINAL UNIT RE-HEAT COIL CONTROL VALVE 21 21

EXHAUST VALVE FLOWRATE 1 1

EXHAUST VALVE DAMPER POSITION 1 1

OVERALL POINTS 65 12 51 2 130 0

NOTES:

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:16

:51

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

M805

MECHANICALCONTROL

Approver

19-0056.001

Author

ROOF

ERU COIL

ERR

ERS

M M

2 NOT TO SCALE

EXHAUST FAN CONTROL DIAGRAM

VFD

DP

LS LS

VFD

ERS

ERR

P-MAU-001

EN

ER

GY

RE

CO

VE

RY

CO

IL

P-MAU-002

EN

ER

GY

RE

CO

VE

RY

CO

IL

P-MAU-003

EN

ER

GY

RE

CO

VE

RY

CO

IL

P-ERU-001

P-ERU-002

P-ERU-003

P-ERU-004

EXHAUSTAIR

EXHAUSTAIR

EXHAUSTAIR

EXHAUSTAIR

ER

U C

OIL

ER

U C

OIL

ER

U C

OIL

ER

U C

OIL

ERS

ERR

ERS

ERR

ERS

ERR

ERS

ERR

ERS

ERR

ERS

ERR

P-PMP-ERW-001

3 NOT TO SCALE

ENERGY RECOVERY SYSTEM CONTROL DIAGRAM

MS

E

SUPPLYAIR

RETURNAIR

30%

PR

E-F

ILT

ER

CO

OLIN

G C

OIL

CH

WR

CH

WS

1 NOT TO SCALE

P-FCU-001 THRU P-FCU-007 CONTROL DIAGRAM

ENERGY RECOVERY SYSTEM SEQUENCE OF OPERATIONS

1. THE PUMP SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE PUMP.

2. THE BMS SHALL MONITOR A CURRENT TRANSDUCER SWITCH FOR STATUS. IF STATUS IS NOT ESTABLISHED WITHIN ONE MINUTE AFTER STARTING THE UNIT, THE BMS SHALL SIGNAL AN ALARM. IF THE STATUS IS LOST AT ANY TIM DURING NORMAL OPERATION, THE BMS SHALL SIGNAL ALARM.

3. THE BMS SHALL MONITOR OUTSIDE AIR TEMPERATURE AND STOP THE SYSTEM PUMP WHEN THE OA TEMPERATURE IS BETWEEN 50°F AND 68°F FOR A PERIOD OF 10 MINUTES, ADJUSTABLE. THE SYSTEM SHALL OTHERWISE RUN AT ALL TIMES.

ENERGY RECOVERY SYSTEM CONTROL POINTSPOINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESENERGY RECOVERY SYSTEM

PUMP STATUS - CURRENT TRANSDUCER 1 1 PROVIDE POINT WITH ALARM SIGNAL

PUMP START/STOP COMMAND 1 1

OVERALL POINTS 0 1 0 1 2 0

NOTES:

EXHAUST FAN CONTROL POINTSPOINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESEXHAUST FANS

DUCT STATIC PRESSURE 4 4 PROVIDE POINT WITH ALARM SIGNAL

FAN STATUS - CURRENT TRANSDUCER 8 8 PROVIDE POINT WITH ALARM SIGNAL

FAN START/STOP COMMAND 8 8

FAN VFD SPEED 8 8 16

FAN HOA STATUS 8 8 PROVIDE POINT WITH ALARM SIGNAL

FAN DISCHARGE DAMPER 8 8 16 PROVIDE COMMAND AND STATUS

HIGH LIMIT DUCT STATIC PRESSURE 0 0 PROVIDE POINT WITH ALARM SIGNAL

LOW LIMIT DUCT STATIC PRESSURE 8 8 PROVIDE POINT WITH ALARM SIGNAL

OVERALL POINTS 12 32 8 16 68 0

NOTES:

EXHAUST FAN SEQUENCE OF OPERATIONS

FAN OPERATION

1. THE FOLLOWING UNITS SHALL BE STARTED AND STOPPED TOGETHER:

a. P-MAU-001 → P-EF-001A, P-EF-001B, P-EF-002A, P-EF-002B

b. P-MAU-002 → P-EF-003A, P-EF-003B

c. P-MAU-003 → P-EF-004A, P-EF-004B

2. DURING NORMAL OPERATION, THE EXHAUST SYSTEM INCLUDES N+1 EXHAUST FANS. BOTH FANS SHALL RUN SIMULTANEOUSLY AND MODULATE SPEED TOGETHER TO MAINTAIN DUCT STATIC PRESSURE.

3. IN THE EVENT THAT A FAN FAILS, IT'S ASSOCIATED DISCHARGE DAMPER SHALL CLOSE, AND THE REMAINING OPERATIONAL FAN SHALL MODULATE SPEED TO MAINTAIN DUCT STATIC PRESSURE.

4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT.

5. THE BMS SHALL MONITOR A CURRENT TRANSDUCER SWITCH FOR STATUS. IF THE STATUS IS NOT ESTABLISHED WITHIN ONE MINUTE AFTER STARTING THE UNIT, THE BMS SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM.

6. FAN SPEED CONTROL

a. THE BMS SHALL MONITOR DUCT STATIC PRESSURE AND MODULATE THE FAN SPEED TO MAINTAIN SETPOINT.

b. THE CONTROLS CONTRACTOR SHALL LOCATE THE DUCT STATIC PRESSURE AND ESTABLISH THE INITIAL SETPOINT.

c. THE TAB CONTRACTOR SHALL ESTABLISH DUCT STATIC PRESSURE SETPOINT WHEN BALANCING THE SYSTEM.

SAFETIES

1 LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE DUCT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT.

FAN COIL UNIT CONTROL POINTS - P-FCU-001 THRU P-FCU-007POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTES

COOLING COIL CONTROL VALVE POSITION 7 7

FAN START/STOP COMMAND 7 7

FAN STATUS 7 7

SPACE THERMOSTAT 7 7

OVERALL POINTS 7 7 7 7 28 0

NOTES:

FAN COIL UNITS SEQUENCE OF OPERATIONS (P-FCU-001 THRU P-FCU-007)

FAN OPERATION

1. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS.

SPACE TEMPERATURE CONTROL

1. WHILE THE SUPPLY FAN IS ON, THE BMS SYSTEM SHALL MONITOR THE SPACE TEMPERATURE AND SHALL MODULATE THE CHILLED WATER CONTROL VALVE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT.

2. WHILE THE SUPPLY FAN IS OFF, THE BMS SYSTEM SHALL CLOSE THE CHILLED WATER CONTROL VALVE.

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:16

:52

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

M806

MECHANICALCONTROL

Approver

19-0056.001

Author

ABBREVIATIONS

ABBR. DESCRIPTION ABBR.

AMPERAGE

ABOVE COUNTER

ABOVE FINISHED FLOOR

AMP FUSE

AVAILABLE INTERRUPTING CURRENT

ALUMINUM

AMERICAN NATIONAL STANDARDS INSTITUTE

AUTOMATIC TRANSFER SWITCH

AUDIO VISUAL

AMERICAN WIRE GAUGE

CONDUIT

CIRCUIT REAKER

COPPER OR CONDENSING UNIT

DIMMING

DAY-LIGHTING

EMERGENCY

EMERGENCY - CRITICAL

EXHAUST FAN

EMERGENCY - LIFE SAFETY

EMERGENCY - EQUIPMENT

ENERGY RECOVERY UNIT

EXISTING

FIRE ALARM

FIRE ALARM ANNUNCIATOR

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

FAN COIL UNIT

FACILITY MANAGEMENT SYSTEM

GROUND FAULT INTERRUPTER

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT EQUIPMENT PROTECTION

GROUND FAULT PROTECTION

GROUND

HORSEPOWER

DESCRIPTION

A

AC

AFF

AFU

AIC

AL

ANSI

ATS

A/V

AWG

C

CB

CU

D

DL

E

EC

EF

EL

EQ

ERU

EX / (E)

FA

FAA

FACP

FATC

FCU

FMS

GFI

GFCI/G

GFEP

GFP

GND/G

HP

THOUSAND CIRCULAR MILS

KILOVOLT

KILOVOLT AMPS

KILOVOLT AMPS REACTIVE

KILOWATT

KILOWATT HOUR

LONG TIME/SHORT TIME/ INSTANTANEOUS & GFP

MOTOR CONTROL CENTER

MAN HOLE

MEGA VOLT AMP

NORMALLY CLOSED

NATIONAL ELECTRIC CODE

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NATIONAL FIRE PROTECTION ASSOCIATION

NORMALLY OPEN

POLE

PUBLIC ADDRESS

PHOTOCELL

ROOM CONTROLLER

SUPPLY FAN

SURGE PROTECTIVE DEVICE

TELEVISION

TYPICAL

UNDER COUNTER

UNDERWRITERS LAB

UNLESS OTHERWISE NOTED

UNINTERRUPTABLE POWER SUPPLY

VOLTS/VOLTAGE

VARIABLE FREQUENCY DRIVE

WALL MOUNTED

WEATHERPROOF & GCFI

WEAHERPROOF

TRANSFORMER

MOUNT 6" ABOVE COUNTER/EQUIP.

KCMIL

KV

KVA

KVAR

KW

KWH

LSIG

MCC

MH

MVA

NC

NEC

NEMA

NFPA

NO

P

PA

PC

RC

SF

SPD

TV

TYP

UC

UL

UON

UPS

V

VFD

W

WG

WP

XFMR/T

"+"

NUMBER

SHEET NUMBER

X PLAN OR DETAILSCALE: 1/4" = 1'-0"X-X

A. ALL AREAS ARE TO BE CONSIDERED AS FINISHED SPACES UNLESS NOTED OTHERWISE. SEE FLOOR PLANS AND DETAILS FOR ADDITIONALREQUIREMENTS. ALL WIRING WORK IS TO BE CONCEALED UNLESS NOTED OTHERWISE. EXPOSED FLEXIBLE WIRING METHODS ARE NOT ALLOWED IN FINISHED SPACES. ANY EXPOSED RACEWAYS SPECIFICALLY ALLOWED BY NOTES ON PLANS ARE TO BE PAINTED TO MATCH THE EXISTING SURFACE FINISH.

B. COORDINATE FINAL LOCATIONS OF ALL DEVICES WITH OWNER ANDARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OFEQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINALLOCATION SO AS NOT TO INTERFERE WITH FURNISHINGS OR WALLMOUNTED ITEMS.

C. COORDINATE LOCATION OF ALL MECHANICAL, PLUMBING AND FIREPROTECTION EQUIPMENT WITH THEIR TRADE DRAWINGS AND INSTALLING CONTRACTORS.

D. EACH BRANCH CIRCUIT IS TO HAVE ITS OWN NEUTRAL WIRE AND IS NOTTO SHARE A NEUTRAL WITH OTHER CIRCUITS.

E. ALL ELECTRICAL WIRING DEVICES ARE TO BE RECESSED (FLUSHMOUNTED) UNLESS NOTED OTHERWISE OR OTHERWISE DIRECTED BYOWNER.

F. NOTE THAT THE IDENTIFICATION LABELS TO BE USED/MADE FOR ALLSYSTEMS MUST USE THE OWNER'S ROOM NUMBERS AND ROOM NAMES,NOT THE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS.MEET WITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS ANDNAMES PRIOR TO LABELING SYSTEMS.

G. ALL FINAL ELECTRICAL PANEL SCHEDULES ARE TO BE UPDATED ANDCONFORM TO THE OWNER'S ROOM NUMBERS AND ROOM NAMES, NOTTHE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS. MEETWITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS AND NAMESPRIOR TO GENERATING FINAL PANEL SCHEDULES.

H. PERFORM ALL CUTTING AND PATCHING NECESSARY TO PERFORM WORK.MATCH EXISTING MATERIALS, FINISHES, FIRE RATINGS, PAINT COLORS,ETC. IN ALL AREAS OF PATCHING.

I. PROVIDE 2#10AWG+1#12AWG BRANCH WIRING FOR ALL 20A BRANCHCIRCUITS LONGER THAN 100 FEET.

J. THE USE OF FLEXIBLE METAL CLAD WIRING (MC) IS LIMITED TO ONLY BEUSED IN CONCEALED LOCATIONS AND IN LENGTHS NOT EXCEEDING 25FT.

K. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FORMECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS.COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

L. ALL WORK MUST COMPLY WITH THE NATIONAL ELECTRICAL CODE 2017EDITION AS ADOPTED BY THE STATE OF NEW MEXICO.

M. SCOPE OF NEW WORK INCLUDES BUT IS NOT LIMITED TO THEFOLLOWING:1. PROVIDE ELECTRICAL DISTRIBUTION, INCLUDING BREAKER AND

BRANCH WIRING;2. PROVIDE BATTERY POWERED EMERGENCY LIFE SAFETY

LIGHTING;3. PROVIDE LIGHTING AND CONVENIENCE POWER OUTLETS;4. PROVIDE CONDUIT AND BOX FOR NEW FIRE ALARM SYSTEM;5. PROVIDE CONDUIT AND BOX FOR DATA COMMUNICATION

SYSTEMS;6. PROVIDE CONDUIT AND BOX SYSTEM FOR SECURITY SYSTEM;

ELECTRICAL GENERAL PROJECT NOTES:

LED 1'X4' LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP

LED 2'X4' LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP

LED 2'X2' LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP

LED HANGING LINEAR LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP; PROVIDE LENGTH AS SHOWN ON PLANS.

TRACK ASSEMBLY AND HEADS; LOWER CASE LETTERS INDICATE SWITCHING GROUP.

WALL SCONCE LIGHT FIXTURE SEE ARCHITECTURAL DRAWINGS/ELEVATIONS FOR MOUNTING HEIGHTS.

EXTERIOR WALL LIGHT FIXTURE; MOUNTING HEIGHT AS NOTED ON PLAN. COORDINATE LOCATION WITH ARCHITECTURAL DRAWINGS/ELEVATIONS.

EXIT LIGHT; PROVIDE NUMBER OF FACES, DIRECTION OF CHEVRONS AND MOUNTING AS SHOWN ON ELECTRICAL AND ARCHITECTURAL DRAWINGS AND AS REQUIRED FOR PATH OF EGRESS. CONNECT TO UNSWITCHED LEG OF LOCAL LIGHT CIRCUIT.

LIGHT FIXTURE, TYPE AS NOTED

LIGHT FIXTURE - BATTERY EMERGENCY LIGHTING UNIT

REMOTE EMERGENCY LIGHTING HEAD

SINGLE POLE, THREE WAY SWITCH AND FOUR WAY SWITCH, 20A RATED MOUNT 44" AFF; LOWER CASE LETTER INDICATES SWITCHING GROUP; LETTER "K" INDICATES KEY OPERATED SWITCH

WALL SWITCH - DIMMER

WALL SWITCH WITH INTEGRAL MOTION/OCCUPANCY SENSOR

LIGHTING CONTROL OCCUPANCY SENSOR -CEILING MOUNTED

LIGHTING CONTROL DAYLIGHT SENSOR -CEILING MOUNTED

LIGHTING CONTROL PHOTOCELL SENSOR -CEILING MOUNTED

ROOM CONTROLLER

EMERGENCY LIGHTING RELAY, SEE DETAIL

LIGHTING CONTROL STATION

TAMPER RESISTANT DUPLEX AND QUADRAPLEX CONVENIENCE RECEPTABLE, MOUNTED 18" AFF U.N.O.

TAMPER RESISTANT DUPLEX OR QUADRAPLEX CONVENIENCE RECEPTABLE, ONE "GREEN" DUPLEX WIRED TO SWITCH CIRCUIT, MOUNT 18" AFF U.N.O.

CEILING MOUNTED RECEPTACLE

FLOOR MOUNTED RECEPTACLE

SPECIAL RECEPTACLE, TYPE AS NOTED

DISCONNECT SWITCH, NUMBERS INDICATE AMPERAGE/# OF POLES; 30A/3P UNO

COMBINATION STARTER/DISCONNECT

MOTOR SYMBOL

HAND HOLE

DESCRIPTION

LEGEND

SYMB. DESCRIPTIONSYMB.

$,$3,$4,$a, $K

$D

OS

OS

ER

FIRE ALARM MANUAL PULL STATION, MOUNT 44"AFF.

FIRE ALARM STROBE LIGHT, MOUNT 80" AFF OR 6" BELOW CEILING, WHICHEVER IS LOWER

SPEAKER ONLY. PROVIDE DEEP 2 GANG 4" SQUARE BACKBOX WITH EXTENSION.

CEILING SPEAKER WITH STROBE LIGHT. PROVIDE DEEP 2-GANG 4" SQUARE BACKBOX WITH EXTENSION RING.

SPEAKER WITH STROBE LIGHT. PROVIDE DEEP 2-GANG 4" SQUARE BACKBOX WITH EXTENSION RING.

PHOTOELEC SMOKE DETECTOR

COMBINATION RATE OF RISE/FIXED TEMPERATURE HEAT DETECTOR

FIRE ALARM DUCT DETECTOR W/ REMOTE TEST AND INDICATING STATION

FIRE/SMOKE DAMPER

MAGNETIC DOOR HOLDER

FIRE ALARM REMOTE ANNUNCIATOR

FIRE ALARM CONTROL PANEL

TAMPER SWITCH

FLOW SWITCH

POST INDICATOR VALVE

CABLE TRAY ABOVE DROPPED CEILING, SEE GENERAL SHEET NOTES.

ELECTRIC POWER PANEL

JUNCTION BOX

TRANSFORMER

CIRCUIT BREAKER

FUSED SWITCH

HOME RUN - 2#12+1#12G IN 3/4"C UNO.

BRANCH CIRCUIT RUN CONCEALED IN CEILING AND WALLS - 2#12+1#12G IN 3/4"C UNO.

THIN LINED DASHED SYMBOL INDICATES EXISTING TO REMAIN UNO.

SEE SHEET NOTE #

F

E###

J J

T

a

a

a

a

a

DL

M

HH

LCS

PC

DH

ANN

FACP

RC

TS

FS

PIV

F

F

P

R/F

12"x4"

ELECTRICAL SHEET LIST

E001 LEGENDS & SPECIFICATIONS

ES101 ELECTRICAL SITE PLAN

EDL121M ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 330

EDP101M ELECTRICAL POWER DEMOLITION FLOOR PLAN - BLDG 330

EL121M ELECTRICAL LIGHTING FLOOR PLAN - BLDG 330

EL122M ELECTRICAL OUTDOOR LIGHTING FLOOR PLAN - BLDG 330

EP101M ELECTRICAL POWER FLOOR PLAN - BLDG 330

EDL101C ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 643

EDP101C ELECTRICAL POWER DEMOLITION FLOOR PLAN - BLDG 643

EP101C ELECTRICAL POWER FLOOR PLAN - BLDG 643

EP102C ELECTRICAL POWER FLOOR PLAN -BLDG 643 - MECH EQUIP

EL121C ELECTRICAL LIGHTING FLOOR PLAN - BLDG 643

EF101C ELECTRICAL TECHNOLOGY FLOOR PLAN - BLDG 643

EP141C ELECTRICAL POWER ROOF PLAN - BLDG 643

EL121N ELECTRICAL LIGHTING FLOOR PLAN - BLDG 663

EP101N ELECTRICAL POWER FLOOR PLAN - BLDG 663

EP102N ELECTRICAL POWER FLOOR PLAN -BLDG 663 - MECH EQUIP

EF101N ELECTRICAL TECHNOLOGY FLOOR PLAN - BLDG 663

EP141N ELECTRICAL POWER ROOF PLAN - BLDG 663

E301N ELECTRICAL LIGHTING SECTIONS - BLDG 663

E401C ELECTRICAL ENLARGED PLANS - BLDG 643

E401N ELECTRICAL POWER ENLARGED PLANS - BLDG 663

E501 ELECTRICAL DETAILS

E502 ELECTRICAL DETAILS

E601CM ELECTRICAL DIAG - BLDG 330 + 643

E601N ELECTRICAL DIAGRAMS - BLDG 663

E701 ELECTRICAL SCHEDULES

E702C ELECTRICAL SCHEDULES

E703C ELECTRICAL SCHEDULES

E704N ELECTRICAL SCHEDULES

E705N ELECTRICAL SCHEDULES

E706 ELECTRICAL SCHEDULES

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:08

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E001

LEGENDS &SPECIFICATIONS

Approver

19-0056.001

Author

.

DN

.

DN

J

J

8166

3904.28'SW2

8165

3904.28'SW2

81153904.34'

SW2

8169

3904.46'BLD3 C

81683904.45'

BLD C

8167

3904.27'BLD

5400

3903.65'CG2

5399

3903.69'CG1

5398

3903.91'GS

52853903.13'

GS

FG4.37

FG4.29

MDP

HH

TS

1

19

2

3

4

5

5

666 7

8

TS 11

10

12

19

9

1

16

16

17

15

20

18

19

21

22

2223

23

23

22

22

24

25

16

13

26

14

28

28

30

SB1

SB1

SB1

SB1 SB1

31

31

31

31

31

31

23

23

22

SB1

SB1

SB1

31

31

3

ES101

2

ES101

ES1014

LDP - 35

SS1SS1SS1SS1SS1

SB131

SB131

29

LDP - 48

BUILDING 330

BUILDING 643

BUILDING 663

S E

SP

INA

ST

.

GREGG ST.

NL TOP OF PARAPET

120' - 0"

NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

LEVEL 1

100' - 0"

NEW LAB LEVEL 1

100' - 0"

NL TOP OF PARAPET

120' - 0"

NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

NL TOP OF PARAPET

120' - 0"

NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

NEW LAB LEVEL 1_CPM

100' - 0"

NL MEZZANINE_CPM

113' - 6"

NEW LAB LEVEL 1

100' - 0"

SS1SS1SS1SS1SS1

30

30

NL TOP OF PARAPET

120' - 0"

NL TOP OF RIDGE

129' - 0"

NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

SC1 SC1 SC1 SC1SC1

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:27

:11

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

ES101

ELECTRICAL SITEPLAN

Approver

19-0056.001

Author

1" = 30'-0"1 ELECTRICAL SITE PLAN

A. SEE ARCHITECTURAL, LANDSCAPING AND CIVIL DOCUMENTS, DRAWINGS AND DETAILS FOR RELATED WORK. COORDINATE ELECTRICAL WORK WITH ALL TRADES AND UTILITY PROVIDERS.

B. EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND SHOWN FOR REFERENCE, EXACT LOCATION AND QUANTITY IS NOT KNOWN. CALL NM811 AND COMPLY WITH STATE STATUTES EXCAVATION LAW NMSA-62-14. COORDINATE WITH UTILITY COMPANIES, REQUEST MARKING, VISIT SITE AND PROCEED CAUTIOUSLY.

C. SEE ELECTRICAL SINGLE LINE E601 FOR ELECTRICAL UTILITY COMPANY INFORMATION.

D. SITE LIGHTING POLE WORK TO INCLUDE POLE, FIXTURE\HEAD, CONCRETE BASE AND WIRING. SEE POLE INSTALLATION DETAILS.

E. ALL EXTERIOR LIGHTS (POLE LIGHTS + WALL LIGHTS) AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE CONTROLLED BY CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E500 SHEETS.

F. ALL EXPOSED PULLBOXES, HANDHOLES, JUNCTION BOXES, OR WIRING ACCESS POINTS ARE TO HAVE TAMPERPROOF SCREWS.

GENERAL SHEET NOTES

1. APPROXIMATE LOCATION OF EXISTING NMDA MEDIUM VOLTAGE UNDERGROUND ELECTRICAL DISTRIBUTION TO REMAIN.

2. APPROXIMATE LOCATION OF NEW ELECTRICAL VAULT TO BE ADDED BY NMDA ELECTRICAL UTILITY, FOR NEW TAP AND FEED TO NEW BUILDING.

3. PROPOSED ROUTING OF NEW MEDIUM VOLTAGE FEEDER BY NMDA ELECTRICAL UTILITY TO CONNECT TO NEW BUILDING TRANSFORMER

4. LOCATION OF NEW ELECTRIC NMDA PAD MOUNTED TRANSFORMER. LOCATE TRANSFORMER PAD WITHIN 10FT OF ROADWAY; COORDINATE FINAL LOCATION WITH NMDA UTILITY. PROVIDE TRANSFORMER PAD WITH VAULT FOR NMDA UTILITY TO INSTALL TRANSFORMER. PROVIDE PER NMDA STANDARDS. COORDIANTE FINAL LOCATION WITH UTILITY. SEE SINGLE E601 FOR ADDITIONAL REQUIREMENTS.

5. PROVIDE BOLLARDS AROUND NEW ELECTRIC TRANSFORMER PER NMDA UTILITY REQUIREMENTS.

6. EXISTING UTILITY EASEMENT ALONG ROADWAY; SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.

7. EXISTING SEWAGE DIVERSION STATION SHOWN FOR REFERENCE, SEE CIVIL DRAWINGS.

8. UNDERGROUND SECONDARY SERVICE FEEDER FROM UTILITY TRANSFORMER TO INTERIOR MAIN PANEL MDP IN MAIN ELECTRICAL ROOM. SEE SINGLE LINE E601.

9. EXISTING UNDERGROUND COMMUNICATION VAULT TO REMAIN. SEE COMMUNICATION SITE PLAN.

10. NEW MAIN ELECTRICAL ROOM E115, SEE PLAN ON EP101N.11. NEW MDF ROOM T111, SEE PLAN ON ET101N.12. CONDUITS FOR COMMUNICATION SERVICE ENTRANCE CABLES. SEE

COMMUNICATION SITE PLAN.13. POWER FOR FIRE PROTECTION WATER SERVICE HOTBOX HEATER. STUB-UP

UNDERGROUND AND PROVIDE A WEATHERPROOF GFCI TYPE RECEPTACLE INSIDE HOT BOX. DIRECT BURRY 1”C WITH 2#10+1#10G COORDINATE WITH CIVIL AND PLUMBING CONTRACTORS.

14. HAND-HOLE FOR IRRIGATION CONTROL; PROVIDE SIZE #A PER HAND-HOLE DETAIL. COORDINATE FINAL LOCATION WITH SITE AND IRRIGATION DRAWINGS. PROVIDE 2”C FROM HAND-HOLE, TO IRRIGATION CONTROLLER IN ELECTRICAL ROOM.

15. APPROXIMATE LOCATION OF EXISTING NMDA UNDERGROUND COMMUNICATION CABLES TO REMAIN.

16. EXISTING SITE POLE LIGHT TO REMAIN.17. REMOVE AND RELOCATE EXISTING DIRECT BURIED SITE LIGHT POLE.

REMOVE EXISTING UNDERGROUND ELECTRICAL POWER CIRCUIT FROM POLE BACK TO ADJACENT POWER HAND-HOLE. REINSTALL ON WEST SIDE OF BUILDING, SEE NOTES.

18. REMOVE EXISTING BRANCH PORTION OF SITE LIGHTING CIRCUIT.19. EXISTING UNDERGROUND SITE LIGHTING CIRCUIT TO REMAIN.20. REPLACE EXISTING HANDHOLE WITH NEW 12X12 HANDHOLE21. NEW LOCATION OF SITE LIGHT POLE TO BE RELOCATED. INSTALL DIRECT

BURIED POLE TO MATCH EXISTING CAMPUS STANDARD. 22. NEW SITE LIGHTING CIRCUIT, 2#8+1#10G IN 2”C.23. NEW SITE LIGHTING 12X12 HANDHOLE 24. REMOVE AND RELOCATE EXISTING DIRECT BURIED SITE LIGHT POLE TO

ALLOW FOR DIVE WAY ADJUSTMENTS. RELOCATE\EXTEND EXISTING ADJACENT UNDERGROUND SITE LIGHTING CIRCUIT. SEE NOTES. REINSTALL POLE IN POSITION NORTH-WEST OF EXISTING LOCATION; COORDINATE WITH SITE WORK. INSTALL DIRECT BURIED POLE TO MATCH EXISTING CAMPUS STANDARD. REMOVE ADJACENT HAND-HOLE AND LIGHTING CIRCUIT. SEE NOTES.

25. REMOVE PORTION OF EXISTING UNDERGROUND ELECTRICAL SITE LIGHTING CIRCUIT TO FACILITATE LIGHT POLE RELOCATION AND ROADWAY ADJUSTMENT. INTERCEPT EXISTING UNDERGROUND WIRING AT NORTH AND SOUTH OF ROADWAY AND PROVIDE TWO NEW 12X12 HAND-HOLE. INTERCEPT AND EXTEND EXISTING CIRCUIT IN NEW 2”C BETWEEN THE NEW HAND-HOLES. REMOVE EXISTING CONDUIT AND WIRE BETWEEN INTERCEPTION POINTS. COORDINATE WITH CIVIL AND SITE WORK.

26. POWER FOR DOMESTIC WATER SERVICE HOTBOX HEATER. STUB-UP UNDERGROUND AND PROVIDE A WEATHERPROOF GFCI TYPE RECEPTACLE INSIDE HOT BOX. DIRECT BURRY 1”C WITH 2#10+1#10G COORDINATE WITH CIVIL AND PLUMBING CONTRACTORS.

27. SURFACE MOUNTED LINEAR LIGHT FIXTURE MOUNTED TO METAL CANOPY. INSTALL FIXTURE RECESSED UP INTO FLUTE POCKET. CONCEAL ALL WIRING; INSTALL WIRING IN CONDUIT ON ROOF. WIRING 2#8+1#8G IN ¾” IMC. COORDINATE WIRING INSTALLATION METHODS WITH CANOPY MANUFACTURER. SEAL ALL PENETRATIONS. COORDINATE WITH ARCHITECTURAL DETAILS.

28. STEP LIGHT MOUNTING IN WALL ADJACENT TO RAMP.29. POWER FOR DOMESTIC WATER SERVICE HOTBOX HEATER. STUB-UP

UNDERGROUND AND PROVIDE A WEATHERPROOF GFCI TYPE RECEPTACLE INSIDE HOT BOX. DIRECT BURRY 1”C WITH 2#10+1#10G COORDINATE WITH CIVIL AND PLUMBING CONTRACTORS.

30. WALL SCONCE WITH ICON ON FRONT VERTICAL FACE, COORDINATE MOUNTING HEIGHT, SEE DETAIL…

31. SITE LIGHTING BOLLARD AND BASE. COORDINATE FINAL LOCATION WITH ARCHITECT AND LANDSCAPING DRAWINGS.

SHEET KEYNOTES

NORTH

1/8" = 1'-0"2 OUTSIDE LAB WALL ELEVATIONS - NORTH FACING SOUTH

1/8" = 1'-0"3 OUTSIDE LAB WALL ELEVATIONS - SOUTH FACING NORTH1/8" = 1'-0"4 ELECTRICAL SITE PLAN - WALK WAY

31

ALTERNATE #3

27 27 27 27 27

OS

OS

OS OS

OSOSOS

PP

PP

PP PP

PP

PP

OS

OS

OS OS

OSOSOS

PP

PP

PP PP

PP

PP

?

?

1

5

2

3

3

OFFICE

106

STORAGE

107

OFFICE

108

OFFICE

110

COPY

111

WOMEN

112

MEN

113

MEP

114

ENTRY

101

OFFICE

105

OFFICE

104B

OFFICE

104A

OFFICE

103

BREAK

102

OFFICE

104

FIRE RISER

109

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:25

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EDL101C

ELECTRICALLIGHTINGDEMOLITIONFLOOR PLAN -BLDG 643

Approver

19-0056.001

Author

1/4" = 1'-0"1 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 643

A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.

B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.

C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.

D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.

E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.

F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.

G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.

H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.

I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.

GENERAL SHEET NOTES

1. REPLACE ALL INTERIOR LIGHT FIXTURES INSIDE BUILDING WITH NEW; SEE ARCHITECTURAL CEILING PLANS. REMOVE FIXTURES, CONTROLS AND WIRING BACK TO PANEL. SEE NEW WORK PLANS

2. REPLACE EXISTING LOBBY LIGHTING, SEE NEW WORK PLAN. MAINTAIN WIRING TO RECONNECT.

3. REPLACE TOILET ROOM LIGHTS IN SAME LOCATION. SEE NEW WORK PLAN.4. REPLACE MECHANICAL ROOM LIGHTS IN SAME LOCATION. SEE NEW WORK

PLAN.5. EXISTING OUTDOOR CANOPY FIXTURES ARE TO REMAIN.

SHEET KEYNOTES

NORTH

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

1

?

?

METROLOGY LAB

137

VEST

141

PROVER

142

STOR

140

MASS

139

MASS

138

ECHELON 1

136

OFFICE

146

ENGINE LAB

101

STOR

110

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:27

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EDL121M

ELECTRICALLIGHTINGDEMOLITIONFLOOR PLAN -BLDG 330

Approver

19-0056.001

Author

1/8" = 1'-0"1 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 3301/8" = 1'-0"2 330 BASEMENT LEVEL ELECT LTG DEMO

ELECTRICAL PUMPS

GENERAL SHEET NOTES

1. REMOVE LIGHTS FIXTURES, CONTROLS AND BRANCH WIRING IN ROOM. MAINTAIN CIRCUIT TO REUSE FOR NEW LIGHTING. SEE NEW WORK PLANS

SHEET KEYNOTES

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.

B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.

C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.

D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.

E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.

F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.

G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.

H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.

I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.

GF

CI

J

J

J

J

GF

CI

GF

CI

GF

CI

J

J

GF

CI

GF

CI

GF

CI

GF

CI

GF

CI

GF

CI

GF

CI

J

J

J

J

J

J

J

J

J

J

J

J

J

GFCI

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

2

1

8

5

5

67

1

4

1

3

OFFICE

106

STORAGE

107

OFFICE

108

OFFICE

110

COPY

111

WOMEN

112

MEN

113

MEP

114

ENTRY

101

OFFICE

105

OFFICE

104B

OFFICE

104A

OFFICE

103

BREAK

102

OFFICE

104

FIRE RISER

109

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:27

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EDP101C

ELECTRICALPOWERDEMOLITIONFLOOR PLAN -BLDG 643

Approver

19-0056.001

Author

1/4" = 1'-0"1 ELECTRICAL POWER DEMOLITION PLAN - BLDG 643

NORTH

GENERAL SHEET NOTES

1. EXISTING ELECTRICAL PANEL TO REMAIN. REMOVE CIRCUITING AS REQUIRED FOR DEMOLITION WORK.

2. REMOVE ALL DEVICES AND WIRING IN ROOM TO ALLOW FOR RENOVATION. EXISTING RACEWAYS MAY BE ABANDONED IN WALLS THAT ARE TO REMAIN; REMOVE CONDUCTORS. REMOVE COMPLETE RACEWAYS WHERE PARTITIONS ARE BEING REMOVED. REMOVE ALL EXISTING DATA OUTLETS AND CABLES BACK TO DATA RACK. REMOVE COMPLETE FIRE ALARM SYSTEM AND DEVICES. SEE NEW WORK PLANS.

3. EXISTING DATA RACKS HIGH ON WALL AND ASSOCIATED ELECTRICAL DEVICES ARE TO REMAIN

4. EXISTING ELECTRICAL DEVICES IN ENTRY TO REMAIN.5. EXISTING ELECTRICAL DEVICES IN TOILET ROOMS TO REMAIN6. EXISTING ELECTRICAL DEVICES IN MECHANICAL ROOM TO REMAIN.7. EXISTING ELECTRICAL VFD\STARTER TO REMAIN. 8. DISCONNECT AND REMOVE CEILING MOUNTED DUPLEX RECEPTACLE AND

PROJECTOR MOUNTING PLATE TO ALLOW FOR CEILING REMOVAL. RETAIN AND RE-SUPPORT FROM STRUCTURE AFTER CEILING REMOVAL.

SHEET KEYNOTES

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.

B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.

C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.

D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.

E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.

F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.

G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.

H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.

I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.

J

J J

J J

J

STOR

MA101

1

1

2

M

PROVER

142VEST

141STOR

140

MASS

139

MASS

138

ECHELON 1

136

METROLOGY LAB

137

OFFICE

146

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:29

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EDP101M

ELECTRICALPOWERDEMOLITIONFLOOR PLAN -BLDG 330

Approver

19-0056.001

Author

1/8" = 1'-0"1 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BLDG 330

GENERAL SHEET NOTES

1. EXISTING ELECTRICAL PANEL TO REMAIN. REMOVE CIRCUITING AS REQUIRED FOR DEMOLITION WORK.

2. REMOVE ALL DEVICES AND WIRING IN ROOM TO ALLOW FOR RENOVATION. EXISTING RACEWAYS MAY BE ABANDONED IN WALLS THAT ARE TO REMAIN; REMOVE CONDUCTORS. REMOVE COMPLETE RACEWAYS WHERE PARTITIONS ARE BEING REMOVED. REMOVE ALL EXISTING DATA OUTLETS AND CABLES BACK TO DATA RACK. REMOVE FIRE ALARM DEVICES. SEE NEW WORK PLANS.

3. EXISTING DATA RACKS TO REMAIN.

SHEET KEYNOTES

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.

B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.

C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.

D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.

E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.

F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.

G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.

H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.

I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.

STOR

MA101

MARKETING

M136

?

?

10' - 0"

A22A22 A22 A22

A22A22 A22 A22

A22A22 A22 A22

A22A22 A22 A22

A22A22 A22 A22

A22A22 A22 A22

A22 A22 A22

A22

EM

EM

X1

1 (TYP)

FP24

FP24

FP24

1 (TYP)

A1

A2

C1

C2

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:32

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EL121M

ELECTRICALLIGHTING FLOORPLAN - BLDG 330

Approver

19-0056.001

Author

GENERAL SHEET NOTES

1. CONNECT NEW FIXTURES TO EXISTING LIGHTING CIRCUIT.

SHEET KEYNOTES

1/8" = 1'-0"1 ELECTRICAL LIGHTING FLOOR PLAN - BLDG 330

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. REPLACE SELECT INTERIOR LIGHT FIXTURES INSIDE BUILDING WITH NEW;

SEE ARCHITECTURAL CEILING PLANS. RETAIN WIRING IN AREA WHERE CEILING IS BEING REINSTALLED. IN AREAS WHERE CEILING IS CHANGING TO OPEN STRUCTURE, REMOVE ALL EXISTING DEVICES, WIRING AND RACEWAYS BACK TO CORRIDOR CEILING AREA, TO ALLOW FOR INSTALLATION OF NEW WIRING SYSTEM. SEE NEW WORK PLANS

C. CONNECT ALL BATTERY POWER EMERGENCY LIGHTS TO UNSWITCHED LEG OF LOCAL LIGHTING CIRCUIT TO CHARGE BATTERIES AND SENSE POWER LOSS TO ILLUMINATE LAMPS.

D. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL CEILING PLANS.

E. PROVIDE NEW LIGHTING CONTROL THROUGHOUT ALL RENOVATED SPACES, REFER TO E-701 SHEETS FOR LIGHTING CONTROL DIAGRAMS.

F. ALL EXTERIOR LIGHTS WALL LIGHTS AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE TO BE CONTROLLED BY NEW CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E701.

G. PROVIDE SUPPORTS AT DIAGONAL CORNERS OF EACH LIGHT FIXTURE IN ALL T-GRIDS. EXTEND SUPPORT UP TO STRUCTURE.

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

1

1

PANEL (E)B -1

PANEL (E)B -2

SW2SW2SW2

SW1

SW1

2

2

333

SW2

3

4

5

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:39

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EL122M

ELECTRICALOUTDOORLIGHTING FLOORPLAN - BLDG 330

Approver

19-0056.001

Author

1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - DEMOLITION

1/8" = 1'-0"3 ELECTRICAL LIGHTING FLOOR PLAN - NEW2

ALTERNATE #4

ALTERNATE #4

ALTERNATE #5

GENERAL SHEET NOTES

1. REMOVE AND REPLACE EXISTING EXTERIOR FIXTURE IN SAME LOCATION. SEE NEW WORK PLANS

2. REPLACE EXISTING EXTERIOR FIXTURE IN SAME LOCATION AND RECONNECT TO EXISTING CIRCUIT\CONTROLS.

3. PROVIDE NEW EXTERIOR WALL LIGHT FIXTURE ON EXISTING WALL. INSTALL 12” BELOW TOP OF WALL. COORDINATE EXACT LOCATIONS WITH ARCHITECTURAL ELEVATIONS. CONCEAL ALL WIRING. PROVIDE NEW 2#12+1#12G CIRCUIT TO EXISTING PANEL “B”; ROUTE WIRING ABOVE EXISTING CEILINGS. REMOVE AND REINSTALL CEILING TILES AS NEEDED.

4. PROVIDE NEW CIRCUIT FOR ADDED EXTERIOR WALL LIGHTS. REMOVE EXISTING 2POLE BREAKER CKT 82/84 IN SECTION-2 AND REPLACE WITH TWO 20A/1P BREAKER. CONNECT NEW LIGHTS TO CKT#82.

5. PROVIDE NEW ASTROLOGICAL TIME CLOCK TO CONTROL ADDED EXTERIOR LIGHTS.

SHEET KEYNOTES

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. REPLACE SELECT EXTERIOR LIGHT FIXTURES WITH NEW; SEE

ARCHITECTURAL ELEVATIONS. RETAIN WIRING. C. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL

ELEVATIONS.D. ALL ADDED NEW EXTERIOR LIGHTS WALL LIGHTS ARE TO BE CONTROLLED

BY NEW TIME CLOCK.E. REFER TO E701 FOR LIGHT FIXTURE SCHEDULE.

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

J

J

J

J

J

J

J

J

MARKETING

M136

STOR

MA101

?

?

A1-9

1

2

3

2

3

2

3

2

3

A1

A2

C1

C2

A1-8

A1-7

A1-6

A1-5

A1-4

A1-3

A1-12

A1-1

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:53

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP101M

ELECTRICALPOWER FLOORPLAN - BLDG 330

Approver

19-0056.001

Author

GENERAL SHEET NOTES

1. RECEPTACLE FOR COPIER; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.

2. NEW POWER CONNECTION TO FURNITURE, COORDINATE EXACT LOCATION WITH ARCHITECT. 2-GANG J-BOX COVER FOR FURNITURE WHIP CONNECTION. BRANCH CIRCUIT FOR PWR 3/4”C WITH 9#12+1#12G ROUTED CONCEALED IN WALL, AND STUB UP INTO CEILING, THEN EXTENDED TO POWER PANEL. CONNECT FLEXIBLE WHIP FURNISHED WITH THE FURNITURE. COORDINATE ACTUAL LOCATION WITH FURNITURE PROVIDER.

3. NEW DATA CONNECTION TO FURNITURE, COORDINATE EXACT LOCATION WITH ARCHITECT. 2-GANG J-BOX COVER FOR FURNITURE WHIP CONNECTION. PROVIDE TWO 1.25"C FOR COMMUNICATION CABLES; ROUTED CONCEALED IN WALL, AND STUB UP INTO CEILING. CONNECT FLEXIBLE WHIP FURNISHED WITH THE FURNITURE. COORDINATE ACTUAL LOCATION WITH FURNITURE PROVIDER. SEE TECHNOLOGY DRAWINGS.

SHEET KEYNOTES

1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 3301/8" = 1'-0"2 330 BASEMENT LEVEL ELECT POWER

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND

ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.

C. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

D. AVOID BACK-TO-BACK ELECTRICAL BOXES (RECEPTACLES, TELECOM OUTLETS, SWITCHES) BETWEEN CLASSROOMS. IF BOXES OCCUR IN THE SAME STUD-SPACE CAVITY, PROVIDE SOUND PUTTY PAD OVER BOXES SERVING ONE ROOM.

E. PROVIDE CAT6 COMMUNICATION CABLES TO NEW DATA OUTLETS AND WIRELESS ACCESS POINTS (WAP). SEE SPECIFICATIONS. ALL DATA OUTLETS AND WAP’S SHOWN ON SHEET ARE NEW UNLESS NOTED OTHERWISE. PROVIDE SLACK CABLE AT EACH END OF NEW DATA CABLES: 10FT IN IDF + 12FT IN CEILING AT EACH OUTLET.

F. COMMUNICATION CABLES INSTALLATION: ALL NEW DATA CABLES ARE TO BE RUN CONCEALED; CONCEAL IN CEILINGS; INSTALL IN 1”EMT WHERE EXPOSED. PROVIDE J-HOOK SUPPORT ABOVE CEILINGS

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

J

J

J

J

J

J

JJJ

J

J

J

J

CHEMISTRY LAB

C106

BV

C105

CLEAN LAB

C105A

GRINDING

C105B

SAMPLE STOR

C103

RECEIPT & DATAENTRY

C101

STOR

CS111

W

CR112

M

CR113

MECH

CM114

ICP-MS

C110

INSTRUMENT RM

C108

WASHING

C102

BALANCE RM

C106B

CHEM & FLAMSTOR

C106A

EQ & STOR

C107

(E) LB3(E) LB4

(E) LB1

1

1

1

1

1

1

1

1

1

1

22

2

2

2

2

2

2

2

5 5

3

4

(TYP)

(TYP)

3

4

(TYP)

(TYP)

6

6

(E) SDP2

(EX)

WG

13

(E) LB2

(E) LB4 - 7,9

(E) LB4 - 6,8

(E) LB4 - 3,5

(E) LB4 - 2,4

(E) LB4 - 14,16

(E) LB4 - 11,13(E) LB1 - 4,6

(E) LB1 - 3,5

(E) LB4 - 10,12

(E) LB4 - 15

(E) LB4 - 22

(E) LB4 - 18

(E) LB4 - 20

(E) LB4 - 21,23

9

12 11

10

(TYP)

13 13

(E) LB4 - 24

(E) LB4 - 25

(E) LB4 - 26

(E) LB4 - 27

(E) LB4 - 28

(E) LB4 - 35(E) LB4 - 36

(E) LB4 - 34 (E) LB4 - 33

(E) LB4 - 32

(E) LB4 - 31(E) LB4 - 30

(E) LB4 - 29

(E) LB4 - 37

IT

CT101A

FIRE

C109(E) LB4 - 17,19

7

8

(E) LB4 - 38

(E) LB4 - 39

(E) LB4 - 40 (E) LB4 - 42

(E) LB4 - 41(E) LB4 - 43

(E) LB4 - 44

(E) LB4 - 46,48

(E) LB4 - 45

(E) LB4 - 49

(E) LB4 - 53

(E) LB4 - 52

(E) LB4 - 51

(E) LB4 - 50

14

(E) LB4 -43

(E) LB3 - 7

(E) LB3 - 6

(E) LB3 - 4

(E) LB3 - 8

(E) LB3 - 9

(E) LB3 - 10

(E) LB3 - 14

(E) LB3 - 13

1516

14

(E) LB3 - 16

(E) LB3 - 17

(E) LB3 - 15(E) LB3 - 18,20

(E) LB3 - 19 (E) LB3 - 21,23

(E) LB2 - 3

(E) LB2 - 2,4

(E) LB2 - 1

17

18

19

(EX) (EX)

(EX)

(EX)

(EX)

(EX)

(E) LB2 - 6

(E) LB2 - 5

(E) LB1 - 7

(E) LB1 - 8

(E) LB1 - 9 (E) LB1 - 10

(E) LB1 - 14

(E) LB1 - 13

(E) LB1 - 11

(E) LB1 - 12

(E) LB1 - 16

(E) LB1 - 18

(E) LB1 - 15

(E) LB1 - 17

(E) LB1 - 19

(E) LB1 - 21

(E) LB1 - 23

(E) LB1 - 20

(E) LB1 - 22

(E) LB1 - 24

(E) LB1 - 25

(E) LB1 - 29

(E) LB1 - 31,33

(E) LB1 - 30

(E) LB1 - 35,37

(E) LB1 - 34

(E) LB1 - 38,40

20

20

14

(E) LB1 - 43,45

(E) LB1 - 44,46,48

(E) LB1 - 47,49,51

(E) LB1 - 50,52,54

(E) LB1 - 39

14

22

21

21

23

23

23

23

23

24

(E) LB2 - 7

25

(E) LB2 - 61,63,65

(E) LB2 - 55,57,59

2627

28

29(E) LB1 - 55

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:50

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP101C

ELECTRICALPOWER FLOORPLAN - BLDG 643

Approver

19-0056.001

Author

A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.

B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

C. SEE LAB DRAWINGS AND DETAILS FOR COORDINATION

GENERAL SHEET NOTES

1. TWO COMPARTMENT SURFACE METAL WIREWAY MOUNTED ABOVE BACK SPLASH OF COUNTER. INSTALL DEVICES IN RACEWAY. PROVIDE A 1”C CONCEALED IN WALL FOR POWER, ROUTED UP INSIDE WALL. PROVIDE A 1.25”C FOR DATA WIRING FROM DATA COMPARTMENT, CONCEALED INSIDE WALL, UP INTO ACCESSIBLE CEILING. SEE LAB DRAWINGS. BASIS OF DESIGN: WIREMOLD ALA4800 SERIES ALUMINUM RACEWAY.

2. CONNECT CIRCUITS TO HOOD; FOR INTERNAL RECEPTACLES AND LIGHTS. TWO 120V 20A, EACH 2#12+1#12G. COORDINATE WITH HOOD INSTALLER.

3. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSURE WITH RECEPTACLES. BASIS OF DESIGN TECLAB DOUBLE SIDED DOUBLE PEDASTAL #EP-1313ABAF. PROVIDE (2) GFCI DUPLEX RECEPTACLE(S) ON EACH SIDE. SEE LAB DRAWINGS.

4. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR FOR DATA JACKS. BASIS OF DESIGN TECLAB DOUBLE SIDED SINGLE PEDASTAL #EP-1311ABAF. SEE DATA DRAWINGS FOR CABLING AND JACK REQUIREMENTS; COORDINATE WORK. SEE LAB DRAWINGS.

5. POWER AND DATA WIRING TO ISLAND CASEWORK TO DROP DOWN UTILITY CHASE AND BE ROUTED INSIDE CASEWORK. SEE LAB DRAWINGS.

6. ROUTE POWER AND DATA WIRING DROPS TO FREE STANDING EQUIPMENT IN UTILITY COLUMN; MOUNT RECEPTACLES ON COLUMN. SEE LAB DRAWINGS.

7. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR WITH RECEPTACLES. BASIS OF DESIGN TECLAB SINGLE SIDED PEDASTAL #EP-1312ABAF. PROVIDE (2) GFCI DUPLEX RECEPTACLE(S). SEE LAB DRAWINGS.

8. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR FOR DATA JACKS. BASIS OF DESIGN TECLAB SINGLE SIDED PEDASTAL #EP-1310ABAF. SEE DATA DRAWINGS FOR CABLING AND JACK REQUIREMENTS; COORDINATE WORK. SEE LAB DRAWINGS.

9. INSTALL RECEPTACLE IN LOWER CABINET FOR VACUUM PUMP INSIDE CABINET. CONTROL RECEPTACLE BY SWITCH IN FACE OF CABINET, SEE CASEWORK DRAWINGS. COORDINATE WITH CASEWORK AND HOOD INSTALLER. SEE LAB DRAWINGS.

10. INSTALL DEVICES FLUSH IN SHORT WALL\CHASE BUILT BEHIND CASEWORK. COORDINATE DEVICES AT LAB BENCH WITH LAB DRAWINGS.

11. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 20A NEMA 6-20R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN CHASE WALL; SEE LAB DRAWINGS.

12. POWER DISCONNECT FOR #CH002, FURNACE; MOUNT 60A/2POLE DISCONNECT ON WALL WEST OF CASEWORK AND EXTEND POWER CONCEALED INSIDE WALL TO CHASE BEHIND UNIT ON COUNTER. PROVIDE FLEXIBLE WHIP CONNECTION TO UNIT. 2#8+1#10G. SEE LAB DRAWINGS.

13. GROUND BAR ON WALL, 12”LONG X 2”HGH X 1/4"THICK COPPER ON STANDOFFS. MOUNT HIGH ON WALL; COORDIANTE FINAL MOUNTING HEIGHT. 1#6G BACK TO BLDG MAIN GROUND BUS.

14. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 20A NEMA 6-20R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL; SEE LAB DRAWINGS.

15. RECEPTACLE HIGH ON WALL FOR RO SYSTEM. COORDINATE WITH LAB DRAWINGS.

16. CONNECTION FOR UNDERCOUNTER WASHER. COORDINATE WITH LAB DRAWINGS.

17. IT-CLOSET SPECIAL RECEPTACLE; 208V 20A NEMA 6-20R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL. COORDINATE MOUNTING LOCATION WITH NMSU-IT.

18. COORDINATE MOUNTING LOCATION OF ALL RECEPTACLES IN IT-CLOSET WITH NMSU-IT.; INSTALL IN FLUSH IN WALL.

19. TELECOMM GROUND BUS AND GROUND WIRE BACK TO MAIN GROUND BUS; SEE GROUNDING DIAGRAM ON E601

20. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 20A NEMA L6-30R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL; SEE LAB DRAWINGS.

21. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 3PHASE 20A, 3#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL; SEE LAB DRAWINGS.

22. POWER DISCONNECT FOR #CH091, UPS; MOUNT 60A/3POLE DISCONNECT ON WALL AND EXTEND POWER TO UNIT. PROVIDE FLEXIBLE WHIP CONNECTION TO UNIT. 3#6+1#10G. SEE LAB DRAWINGS.

23. ALL RECEPTACLES IN ROOM ARE TO BE GFCI TYPE AND INSTALLED IN METAL RACEWAY WHERE RACEWAYS ARE SHOWN ON WALL

24. RECEPTACLE FOR COPIER; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.

25. POWER FOR FIRE ALARM POWER SUPPLY PANEL. COORDINATE WITH SYSTEM INSTALLER.

26. POWER TO ROOFTOP LEF FAN; 208V, 3-PHASE, 60A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL IN MECH RM CM114 ADJACENT TO EXISTING VFD’S, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO FAN ON ROOF. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.

27. POWER TO ROOFTOP PUMP FOR ERU; 208V, 3-PHASE, 30A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL IN MECH RM CM114 ADJACENT TO EXISTING VFD’S, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP ON ROOF. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.

28. SEE ROOF PLAN29. 120V POWER TO MANUALLY CONTROLLED GLYCOL INJECTOR PUMP.

PROVIDE LOCAL MANUAL DISCONNECT. COORDINATE WITH MECHANICAL CONTRACTOR.

SHEET KEYNOTES

NORTH

1/4" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 643

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

J

J

J

J

J

J J

J

J

J

J

J

J

J

JJJ

J

J

J

J

JJ

J

J

J

J

J

JJ

J

J

J

J

J

CHEMISTRY LAB

C106

BV

C105

CLEAN LAB

C105A

GRINDING

C105B

SAMPLE STOR

C103

RECEIPT & DATAENTRY

C101

STOR

CS111

W

CR112

M

CR113

MECH

CM114

ICP-MS

C110

INSTRUMENT RM

C108

WASHING

C102

BALANCE RM

C106B

CHEM & FLAMSTOR

C106A

EQ & STOR

C107

(E) LB3(E) LB4

(E) LB1

VAV-S4.2

VEV4.6VAV-E4.3

VAV-S4.10

VEV-4.20

VAV-S4.9

VEV-4.15

VAV-S4.8

VAV-E4.2

VAV-S4.7VAV-S4.6

VAV-S4.5

VAV-S4.4

VAV.S4.1

1

1

1

1

1

1

1

1

1

11

1

1

1 1

1

1

1

1

11

1

1

1

VEV-4.10VEV-4.9

VEV-4.11

VEV-4.15

VEV-4.14

VEV-4.17

VEV-4.18

VEV-4.19

VEV-4.7

VEV4.6

VEV-4.5

VEV-4.4

VEV-4.3

VEV-4.2

VEV-4.1

VEV-4.20

IT

CT101A

FIRE

C109

1

1

1

1

(E) LB1 -56

(E) LB1 -56

(E) LB1 -56

(E) LB1 -56

(E) LB1 -56

(E) LB1 -56

(E) LB1 -56

(E) LB1 -56

VEV-4.18

(E) LB1 -56

(E) LB2 - 8 (E) LB2 - 8

(E) LB2 - 8

(E) LB2 - 8(E) LB2 - 8

(E) LB2 - 8

(E) LB2 - 8

(E) LB2 - 9

(E) LB2 - 9

VEV-4.20(E) LB2 - 9

(E) LB2 - 9

(E) LB2 - 9

(E) LB2 - 9

(E) LB2 - 9 (E) LB2 - 9

(E) LB2 - 9(E) LB2 - 9

(E) LB2 - 9

(E) LB2

(E) SDP2

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:59

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP102C

ELECTRICALPOWER FLOORPLAN -BLDG 643 -MECH EQUIP

Approver

19-0056.001

Author

A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.

B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

C. SEE LAB DRAWINGS AND DETAILS FOR COORDINATION

GENERAL SHEET NOTES

1. POWER CONNECTION FOR MECHANICAL VAV UNIT. POWER AT 120V TO INTERNAL CONTROL TRANSFORMER PROVIDED WITH VAV. PROVIDE LOCAL SNAP SWITCH AS DISCONNECT MOUNTED WITH-IN 12” OF CONTROL PANEL ON UNIT. COORDINATE WITH MECHANICAL WORK.

2.

SHEET KEYNOTES

NORTH

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

1/4" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 643 - MECHANICAL EQUIPMENT VIEW

CHEMISTRY LAB

C106

INSTRUMENT RM

C108

EQ & STOR

C107

CHEM & FLAMSTOR

C106A

BALANCE RM

C106B

WASHING

C102

RECEIPT & DATAENTRY

C101

BV

C105

CLEAN LAB

C105A

GRINDING

C105BSAMPLE STOR

C103

STOR

CS111

W

CR112

M

CR113

MECH

CM114

ICP-MS

C110

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:30

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EF101C

ELECTRICALTECHNOLOGYFLOOR PLAN -BLDG 643

Approver

19-0056.001

Author

A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.

B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

C. PROVIDE CAT6 COMMUNICATION CABLES TO NEW DATA OUTLETS AND WIRELESS ACCESS POINTS (WAP). SEE SPECIFICATIONS. ALL DATA OUTLETS AND WAP’S SHOWN ON SHEET ARE NEW UNLESS NOTED OTHERWISE. PROVIDE SLACK CABLE AT EACH END OF NEW DATA CABLES: 10FT IN IDF + 12FT IN CEILING AT EACH OUTLET.

D. COMMUNICATION CABLES INSTALLATION: ALL NEW DATA CABLES ARE TO BE RUN CONCEALED; CONCEAL IN CEILINGS; INSTALL IN 1”EMT WHERE EXPOSED. PROVIDE J-HOOK SUPPORT ABOVE CEILINGS.

GENERAL SHEET NOTES

1. NEW\REPLACEMENT FIRE ALARM CONTROL PANEL

SHEET KEYNOTES

1/4" = 1'-0"1 ELECTRICAL FIRE ALARM FLOOR PLAN - BLDG 643

NORTH

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

A. SCOPE OF WORK: INSTALL AN ADDRESSIBLE FIRE ALARM SYSTEM PER THE SPECIFICATIONS AND DRAWINGS. AUDIBLE NOTIFICATION IS HORN BASED. FIRE ALARM SUPERVISION IS REQUIRED FOR FIRE SPRINKLER FLOW.

B. PROVIDE A CODE COMPLIANT, NICET LEVEL III DESIGN TO BE APPROVED BY THE FIRE MARSHAL. PROVIDE DEVICES AS REQUIRED TO MEET ALL NATIONAL AND LOCAL CODE REQUIREMENTS.

C. FIRE ALARM SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL BE IN ACCORDANCE WITH NFPA 70, NFPA 72 AND IFC. SYSTEM IS TO MEET ALL APPLICABLE BUILDING CODES, FIRE CODES AND THE REQUIREMENS OF THE AUTHORITY HAVING JURISDICTION AND INSURANCE CARRIER. VERIFY REQUIREMENS PRIOR TO SHOP DRAWING SUBMITTAL.

D. INFORMATION ON CONTRACT DOCUMENTS IS FOR GENERAL INFORMATION AND BID PURPOSES ONLY. PERFORM REQUIRED CALCULATIONS AND FIELD COORDINATION AND PROVIDE ADDITIONAL DEVICES AS REQUIRED.

E. ADDITIONAL MATERIALS AND LABOR REQUIRED TO SUPPORT CHANGES REQUESTED BY THE AUTHORITY HAVING JURISDICTION SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

F. FLUSH MOUNT ALL NOTIFICATION AND SIGNALING DEVICES TO WALLS. G. DUCT SMOKE DETECTOR, FURNISHED BY DIVISION 28, INSTALLED IN DUCT BY

DIVISION 23, CONNECTED, WIRED AND TESTED BY DIVISION 28. PROVIDE DUCT DETECTORS IN NEW AND EXISTING UNITS WITH AIR MOVEMENT GREATER THAN 2000CFM. INSTALL PER CODE.

H. WHERE APPLICABLE DO NOT INSTALL SMOKE DETECTORS IN A DIRECT AIR FLOW OR CLOSER THAN 3 FEET FROM AN AIR SUPPLY DIFFUSOR OR RETURN AIR OPENING.

I. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.J. INSTALL WALL MOUNTED VISUAL NOTIFICATION DEVICES WITH THEIR BOTTOMS

MOUNTED AT 80”MINIMUM AND 96” MAXIMUM FROM FINISHED FLOOR. K. INSTALL WALL MOUNTED AUDIBLE NOTIFICATION DEVICES WITH THEIR TOPS

MOUNTED AT 90”MINIMUM AND 100” MAXIMUM FROM FINISHED FLOOR AND NO CLOSER THEN 6” TO A HORIZONTAL STRUCTURE.

L. THE CONTRACTOR SHALL ADJUST/INSTALL ALL DEVICES TO MAXIMIZE PERFORMANCE AND TO MINIMIZE FALSE ALARMS.

M. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN CONDUITTHROUGHOUTTHE PROJECT; FIRE ALARM RATED RED MC CABLE IS PERMITTED IN CONCEALED LOCATIONS ONLY. BARE\PLASTIC CABLES INSTALLED IN PLENUM SPACES ARE NOT ACCEPTABLE. ALL RACEWAYS TO BE A MINIMUM SIZE OF 3/4" OR LARGER AS REQUIRED BY THE FIRE ALARM MANUFACTURER.

N. SMOKE DETECTORS SHALL NOT BE ANY CLOSER THAN 1’ FROM FIRE SPRINKLERS.

O. COVER AND PROTECT ALL INSTALLED DEVICES FROM DAMAGE/CONTAMINATION WHILE CONSTRUCTION IS IN PROCESS UNTIL THAT AREA IS READY TO BE TURNED OVER TO THE OWNER.

P. PROVIDE A DEDICATED BRANCH CIRCUIT FOR FIRE ALARM EQUIPMENT. PROVIDE A RED LOCKING DEVICE ON THE BREAKER, TO BLOCK THE HANDLE IN THE “ON” POSITION. LABEL THE CIRCUIT BREAKER AS “FIRE ALARM CIRCUIT CONTROL”. PROVIDE A CIRCUIT ID LABEL ON FIRE PANEL/EXTENDERS. PROVIDE SURGE PROTECTION FOR CIRCUIT TO FIRE ALARM PANEL.

Q. THE INSTALLING CONTRACTOR SHALL PROVIDE A RECORD OF COMPLETION PER NFPA 72, (FIGURE 10.18.2.1.1. 22) CONTROL PANELS, REMOTE ANNUNCIATORS SHALL BE INSTALLED WITH THEIR TOP MOUNTED AT 48”.

R. OWNER SHALL BE RESPONSIBLE FOR ESTABLISHING A FIRE SYSTEM MONITORING CONTRACT OR PROVISIONS.

S. ARCHITECT/ENGINEER AND OWNER SHALL BE NOTIFIED A MINIMUM OF 48 HOURS PRIOR TO THE FINAL INSPECTION AND /OR TESTING.

T. UPON COMPLETION OF THE INSTALLATION OF THE SYSTEMS, A SATISFACTORY TEST OF THE ENTIRE SYSTEM SHALL BE MADE IN ACCORDANCE WITH THE SPECIFICATIONS.

U. SYSTEM DESIGN IS TO INCLUDE THE FOLLOWING MINIMUM REQUIREMENTS IN ADDITION TO ANY SPECIFIC LOCATION NOTED ON FLOOR PLANS.a. SMOKE DETECTION IN ALL CORRIDORS, ELECTRICAL ROOMS,

MECHANCIAL ROOMS, JANITOR CLOSETS, STORAGE ROOMSb. SMOKE DETECTORS AT ALL FIRE ALARM EQUIPMENT LOCATIONSc. FLOW AND TAMPER DEVICES FOR ALL FIRE SUPPRESSION DEVICESd. MONITORING CONNECTION TO FIRE SUPPRESSION SITE POST

INDICATING VALVEe. AUDIBLE AND VISUAL NOTIFICATION DEVICES THROUGHTOUT THE

INSIDE OF THE BUILDINGf. AUDIBLE AND VISUAL NOTIFICATION DEVICES FOR THE EXTERIOR

COURT YARDg. SMOKE DETECTORS IN THE SUPPLY AND RETURNS FOR ALL AIR

HANDLING EQUIPMENT RATED 2,000CFM OR GREATER.

FIRE ALARM GENERAL NOTES

1

OS

PP

?

?

15' - 6 5/8"

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

9' - 0"

10' - 0"

8' - 0"

8' - 0"

9' - 0"

9' - 0"

9' - 0"

15' - 6 3/4"

15' - 7 5/8"

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP22-

FP22-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-FP24-6-

FP24-6-

FP24-6-

FP24-6- FP24-6-

FP24-6- FP24-6-

FP24-6-

FP24-6-FP24-6-FP24-6-FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

15' - 7 3/4"

A22-

A22-

A22-

FP24-6-

FP24-6-

FP24-6-

FP24-6-

V3

V3

2

3

2

3

1

(E) LB3 - 2 (E) LB1 - 2

(E) LB1 -41

(E) LB4 - 1

SW1SW1

SW1

SW1

FP24-6-

C1-C1- C1-

C1-C1-C1-

(E) LB1 - 1

CHEMISTRY LAB

C106

EQ & STOR

C107

CHEM & FLAM

STOR

C106A

BALANCE RM

C106B

INSTRUMENT RM

C108

STOR

CS111

W

CR112

M

CR113

MECH

CM114RECEIPT & DATA

ENTRY

C101

ICP-MS

C110

SAMPLE STOR

C103

BV

C105

CLEAN LAB

C105AGRINDING

C105B

(E) LB3(E) LB4

(E) SDP2

(E) LB1

(E) LB2EMEM

WASHING

C102

IT

CT101A

FIRE

C109

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:30

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EL121C

ELECTRICALLIGHTING FLOORPLAN - BLDG 643

Approver

19-0056.001

Author

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. REPLACE SELECT INTERIOR LIGHT FIXTURES INSIDE BUILDING WITH NEW;

SEE ARCHITECTURAL CEILING PLANS. RETAIN WIRING IN AREA WHERE CEILING IS BEING REINSTALLED. IN AREAS WHERE CEILING IS CHANGING TO OPEN STRUCTURE, REMOVE ALL EXISTING DEVICES, WIRING AND RACEWAYS BACK TO CORRIDOR CEILING AREA, TO ALLOW FOR INSTALLATION OF NEW WIRING SYSTEM. SEE NEW WORK PLANS

C. CONNECT ALL BATTERY POWER EMERGENCY LIGHTS TO UNSWITCHED LEG OF LOCAL LIGHTING CIRCUIT TO CHARGE BATTERIES AND SENSE POWER LOSS TO ILLUMINATE LAMPS.

D. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL CEILING PLANS.

E. PROVIDE NEW LIGHTING CONTROL THROUGHOUT ALL RENOVATED SPACES, REFER TO E-701 SHEETS FOR LIGHTING CONTROL DIAGRAMS.

F. ALL EXTERIOR LIGHTS WALL LIGHTS AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE TO BE CONTROLLED BY NEW CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E701.

G. PROVIDE SUPPORTS AT DIAGONAL CORNERS OF EACH LIGHT FIXTURE IN ALL T-GRIDS. EXTEND SUPPORT UP TO STRUCTURE.

GENERAL SHEET NOTES

1. REPLACE STRIP LIGHTS. MATCH EXISTING HEIGHT. RECONNECT TO EXISTING CIRCUIT.

2. REPLACE EXISTING DOWN LIGHTS IN TOILET ROOMS WITH NEW. RECONNECT TO EXISTING CIRCUIT.

3. REPLACE EXISTING WALL LIGHT OVER MIRROR LIGHT IN TOILET ROOMS WITH NEW. RECONNECT TO EXISTING CIRCUIT.

SHEET KEYNOTES

1/4" = 1'-0"1 ELECTRICAL LIGHTING FLOOR PLAN -- BLDG 643

NORTH

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

C1

LEF

EXISTING AHU-1

1

2

3

WG

(E) LB2 - 10

(E) LB2 - 11

4EQ

C1

EQ

C1

EQ

C1

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:58

:20

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP141C

ELECTRICALPOWER ROOFPLAN - BLDG 643

Approver

19-0056.001

Author

GENERAL SHEET NOTES

1. NEW LAB EXHAUST FAN (LEF). POWER FROM VFD IN MECH ROOM; SEE FLOOR PLAN. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES

2. POWER TO ERU PUMP. POWER FROM VFD IN MECH ROOM; SEE FLOOR PLAN, PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.

3. POWER TO GAS FIRED HUMIDIFIER, 120V 1-PHASE. 2#12 + 1#12G IN 3/4" C. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.

4. PROVIDE WEATHERPROOF, GFCI TYPE POWER RECEPTACLE AT ROOF TOP UNIT. PROVIDE INDEPENDENT SUPPORT FORM UNIT. COORDINATE LOCATION WITH EQUIPMENT INSTALLED. CONSOLIDATE ROOF PENETRATIONS WHERE POSSIBLE AND ROUTE WITH OTHER PENETRATIONS.

5. POWER

SHEET KEYNOTES

1/4" = 1'-0"1 ELECTRICAL POWER ROOF PLAN - BLDG 643

NORTH

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL

EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

C. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, PLUMBING AND ARCHITECTURAL DETAILS.

D. PROVIDE 6” HIGH SUPPORT FOR ALL NEW RACEWAYS OF ROOF.

AREAM

AREAC

AREAN

663

643

330

KEY PLAN

NO

RT

H

.

DN

1 2 3 4 5 7

M

L

K

J

H

G

F

E

D

C

B

A

BAS PANEL

3

EL121N

1

E301N

2

E301N

3

E301N

LP1HP1

HP2 LP2

LP3

LDPMDP TDP

INV1INV2

LAB OFFICES

102

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

VEST

103ACORRIDOR

103

MDF

T111

JAN

J109 M

R107B

W

R107A

VEND

104

U

R105

SEED LAB

110COOL STOR

112B

KIT PREP

112C

OIL/AF

STOR

112D

ELEC

115

DRUM STOR

117

CORRIDOR

101

MAIN LAB

112

ENGINE LAB

112A

MECH/BOILER

M119

DOCK STAGING

121

CENTRAL

RECEIVING

114

PROVER STATION

120

LARGE MASS

118

VESTIBULE

123

STORAGE

118A

ECHELON LEVEL

1 AND 2

116B

MECH

M116

BV

116A

RECEIPT DATA

ENTRY

116

10' - 0"

15' - 1 1/4"

10' - 0"

10' - 0"

9' - 0"9' - 0"

10' - 0"

12' - 9"

10' - 0"

9' - 0"

10' - 0"

A22

B4-6

B4-6

B4-6

B4-6

B4-4

B4-6

B4-6

B4-6

B4-6

B4-6

A22 A22 A22 A22 A22

FP24-6

FP24-6

FP24-6

FP24-6

FP24-6

FP24-6

FP24-6

FP24-6

FP22 FP22

FP22 FP22

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

B4-6

A24

A24

A24

A24

10' - 0"

14' - 0"

12' - 0"

9' - 0" 9' - 0" 9' - 0" 9' - 0"

11' - 4"

15' - 2 3/8"

10' - 0"

10' - 0"

16' - 3 1/2"15' - 10 1/2"

15' - 10 3/8" 14' - 10 1/2"

9' - 0"

9' - 0"

8' - 0"

G8 G8 G8 G12

G8 G8 G8 G12

G8 G8

K24 K24

K24 K24

K24 K24

K24 K24

FP24-6

FP24G

FP24-6

A24

FP24-6FP24-6

FP24-6

FP24-6FP24-6FP24-6

FP24-6 FP24-6

FP24-6 FP24-6

FP24

FP24

B8-15

B8-15

B8-15

B8-15

B4-4

B4-4B4-4B4-4

B4-4 B4-4

EXP1EXP1

B4-4 B4-4

B4-4B4-4

B4-6 B4-6 B4-6 B4-6

B4-6 B4-6

B8-15 B8-15 B8-15 B8-15

B8-15

B8-15

B8-15

B8-15 B8-15 B8-15 B8-15

B8-15 B8-15 B8-15 B8-15

B8-15

B8-15 B8-15B8-15

B8-15

B4-6

B8-15

B8-15 B8-15 B8-15 B8-15

B8-15 B8-15 B8-15 B8-15

B8-15

C1 C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

A22

C1

C1

C1

A22 A22 A22 A22 A22 A22 A22 A22 A22

A22

B8-15

B8-15

B8-15

C1

C1

C1

C1

C1

C1

B4-4

V3

V3

V3

V3

V3C1

B8-15

14

14

1417 (TYP)

14

141414

14

10

1010

11

1

18

14

13

SW18

SW1

8

9

19

12

14

4SW1

8

SW18

SW18

14

16

(TYP)

14

144

14

SW18

1414

1

1411

14

14

14

15

SW2SW1

227

7 SW2

16

(TYP)

14

14

14

14

20

20

19

144

14

11

19

4 2

6

14

21SW2

SW2 SW2

7

7 7

G12

G12

B8-5

B8-5

B8-5

B8-5

B8-5

B8-5

B8-5

B8-5

B8-5

B8-5

MDP - 1

MDP - 2

MDP - 3

MDP - 4

MDP - 5

MDP - 6

MDP - 7

7 SW2 7SW2

1

E301N

2

E301N

3

E301N

EM

EM

EM

X1

EM

EM

EM

X1 X1

X1

X1

X1

EMX1

EM

X1

X1X1

EM

EM

EM

EM

EM

EM

X1

EM

EMX1

EM

EM

X1

EM

EM

EM X1

EM EM

EM

EM

X1

X1

EM

EM EM

EM EM

EM

X1

X1EMEM

X1

X1

X1

12' - 9"

9' - 0"

22 22

2 4 5 7

M

L

K

J

H

G

B8-15 B8-15 B8-15

3

EL121N

5

14

3

6

1

E301N

2

E301N

EMEM

B4-4

B4-4

B4-4

B4-4

B4-4

B4-6 B4-6

NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

NL TOP OF PARAPET

120' - 0"

643 TOP OF S PARAPET

119' - 0"

NL TOP OF RIDGE

129' - 0"

2 3 4 5

B4-6

15

B4-6

N2

RTU

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:37

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EL121N

ELECTRICALLIGHTING FLOORPLAN - BLDG 663

Approver

19-0056.001

Author

GENERAL SHEET NOTES

1. CABLE HANG LIGHT FIXTURES 9’ AFF. COORDINATE HANGING LIGHT FIXTURES WITH FINAL LAYOUT OF MECHANICAL DUCT WORK AND EQUIPMENT.

2. CABLE HANG LIGHT FIXTURES 13’-6" AFF (MATCH BOTTOM OF STEEL). COORDINATE HANGING LIGHT FIXTURES WITH MEZZANINE AND FINAL LAYOUT OF MECHANICAL DUCT WORK AND EQUIPMENT.

3. CABLE HANG LIGHT FIXTURES 9’ ABOVE MEZZANINE. COORDINATE HANGING LIGHT FIXTURES WITH FINAL LAYOUT OF PROVERS AND EQUIPMENT.

4. ROOM LIGHTS ARE MANUALLY CONTROLLED DURING OCCUPIED HOURS AND AUTOMATICALLY CONTROLLED DURING UNOCCUPIED HOURS, SEE E501 FOR LIGHTING CONTROLS.

5. PROVIDE MANUAL OVERRIDE LIGHT SWITCH AT TOP OF STAIR TO MEZZANINE6. SEE MEZZANINE PLAN FOR LIGHT FIXTURES IN TALL SPACE. LIGHTS AT

MEZZANINE ARE TO BE CONTROLLED TOGETHER WITH LIGHTS AT FLOOR LEVEL.

7. MOUNT EXTERIOR LIGHT FIXTURE 15FT ABOVE GRADE. COORDINATE FINAL ELEVATION AND PLACEMENT WITH ARCHITECTURAL ELEVATIONS.

8. MOUNT EXTERIOR LIGHT FIXTURE 9FT ABOVE GRADE. COORDINATE FINAL ELEVATION AND PLACEMENT WITH ARCHITECTURAL ELEVATIONS.

9. SEE SITE PLAN FOR STEP LIGHTS IN AREA.10. COORDINATE LOCATION AND FINAL ELEVATION OF VANITY LIGHT OVER

MIRROR WITH ARCHITECTURAL ELEVATIONS.11. EXTERIOR DOWN LIGHT MOUNTED IN SOFFIT. COORDINATE FINAL POSITION

AND INSTALLATION WITH ARCHITECTURAL DETAILS. 12. EXTERIOR LIGHTING CONTROL TIME CLOCK FOR SITE POLE LIGHTS AND SITE

WALL LIGHTS. TIME CLOCK TO BE NMSU STANDARD. 13. EMERGENCY LIGHTING INVERTER.14. PROVIDE UL924 DEVICE. OVERRIDE LOCAL CONTROL SCHEME TO GO TO FULL

BRIGHT UPON POWER FAILURE. PROVIDE EMERGENCY POWER FROM INVERTER.

15. PROVIDE 3-WAY PILOT-LIGHT WALL SWITCHES FOR MANUAL CONTROL OF LIGHT AT TOP OF LADDER TO ROOF ACCESS. LOCATE AT BOTTOM OF LADDER AND TOP OF LADDER. SEE ELEVATION THIS DRAWING.

16. CABLE HANG LINEAR FIXTURE IN CORRIDOR AT 10FT AFF AND 12” AWAY FROM WALL. COORDINATE FINAL LOCATION AND HEIGHTS WITH ARCHITECTURAL DETAILS.

17. CABLE HANG LINEAR FIXTURE 8’6” AFF. 18. EXPLOSION PROOF CLASS-1 DIV-1 LIGHT FIXTURE IN DRUM STORAGE.19. PROVIDE WEATHERPROOF LIGHT SWITCH ON EXTERIOR WALL OUTSIDE OF

DRUM STORAGE.20. PROVIDE LOCAL WALL SWITCH AT COUNTER TO CONTROL STRIP LIGHT

ABOVE COUNTER.21. CABLE HANG LIGHT FIXTURES 8’ AFF AT COUNTER TO PROVIDE LOCAL TASK

LIGHT. COORDINATE HANGING LIGHT FIXTURES WITH FINAL LAYOUT OF CASEWORK AND EQUIPMENT.

22. MOUNT EXTERIOR LIGHT FIXTURE 8FT ABOVE GRADE. COORDINATE FINAL ELEVATION AND PLACEMENT WITH ARCHITECTURAL ELEVATIONS

SHEET KEYNOTES

NORTH

1/8" = 1'-0"1 ELECTRICAL LIGHTING FLOOR PLAN - BLDG 6631/8" = 1'-0"2 ELECTRICAL LIGHTING MEZZANINE

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001B. CONNECT ALL BATTERY POWER EMERGENCY LIGHTS TO UNSWITCHED LEG

OF LOCAL LIGHTING CIRCUIT TO CHARGE BATTERIES AND SENSE POWER LOSS TO ILLUMINATE LAMPS.

C. CONNECT ALL LUMINAIRES WITHIN DASHED BOUNDARIES TO CIRCUIT INDICATED.

D. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL CEILING PLANS.

E. ALL EXTERIOR LIGHTS (POLE LIGHTS + WALL LIGHTS) AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE CONTROLLED BY CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E500 SHEETS.

F. REFER TO E-501 FOR LIGHTING CONTROL SCHEDULE AND DIAGRAMS.G. REFER TO E-701 FOR LIGHT FIXTURE SCHEDULE.

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

NOT TO SCALE3 Section 77

.

DN

JJ J J J J J J

J

J

J J

J

J

J

JJ

J

JJ

1 2 3 4 5 7

M

L

K

J

H

G

F

E

D

C

B

A

LAB OFFICES

102

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

CORRIDOR

103

VEST

103A

MDF

T111

JAN

J109

M

R107B

W

R107A

VEND

104

U

R105

SEED LAB

110

COOL STOR

112B

KIT PREP

112C

ELEC

115

OIL/AFSTOR

112D

DRUM STOR

117

ENGINE LAB

112AMAIN LAB

112

MECH/BOILER

M119

CORRIDOR

101

DOCK STAGING

121

VESTIBULE

123STORAGE

118A

ECHELON LEVEL1 AND 2

116B

BV

116A

MECH

M116

RECEIPT DATAENTRY

116

LARGE MASS

118

PROVER STATION

120

HP2 LP2

TDPMDP LDP

LP3

CENTRALRECEIVING

114

N2

BP

N1

ET

N2

CHWP

N1

CHWP

N1

HHWP

N2

HHWPN1

ERP

3

EL121N

LP1HP1

E401N1

9

9

99

13

9

9

932

99

99

9

4

1

23

7 8

7 8 7 8 7 8

10

11

15

14

16 16

17

20

21

(TYP)

(TYP)

1919

20

21(TYP)

(TYP)

1

1 LDP - 11

1

4

2

2

4

2

2

3

3

3

3

3

LDP - 3

4 4

4

LDP - 4

LDP - 5

6

6

6

6

LDP - 6

LDP - 2

7 7 7

7 7 7

7

WG

AC AC6

LDP - 8,10,12LDP - 9,11,13 LDP - 14,16,18 LDP - 15,17,19

LDP - 20LDP - 21

LDP - 22LDP - 23

LDP - 24

24

24

LDP - 26

LDP - 25

24

LDP - 36

36 36

36

22

LDP - 37

LDP37

WG

1

E301N

2

E301N

3

E301N

WG

LP2 - 5

LP1 - 2 23

24

24

23

25 25

26

27

LP2 - 6,8

LP1 - 3,523

25

HP2 - 26,28,30

HP2 - 27,29,31

LP3 - 3

LP3 - 1

AC

AC

AC

AC

AC,G

AC,G

AC,G

AC,G

AC

AC

AC

LP1 - 8

LP1 - 10

LP1 - 7

LP1 - 4

LP1 - 6

4

6

8

10

LP1 - 13LP1 - 12

LP1 - 14

119

9

LP1 - 9LP1 - 11

LP1 - 15

15 15 LP1 - 1616

16

16

HP1 - 1,3,5

LP1 - 19LP1 - 18

LP1 - 17

G

G

LP1 - 20

20

20

22

LP1 - 22

22 22

LP1 - 2121

21

21LP1 - 24

LP1 - 23

LP1 - 25

28

28

29

30

+48"

+48"LP1 - 26

LP1 - 27

LP1 - 28

LP1 - 29

28

WG

GGG

G

AC,G

LP1 - 33

33

33

LP1 - 3434 34 34

LP1 - 42

12 12

13

13

N1

BP

LP2 - 14

14

14

14

WG

LDP - 39

WG

LP1 - 42WG

LP3 - 27,29 LP3 - 28,30

LP3 - 12 LP3 - 13 LP3 - 14 LP3 - 15 LP3 - 16 LP3 - 17

LP3 - 18

LP3 - 19 LP3 - 20 LP3 - 21 LP3 - 22

LP3 - 23

LP3 - 24

LP3 - 11LP3 - 10

LP3 - 9

LP3 - 25

25 25

LP3 - 26

(TYP)

AC

AC

AC

AC AC

6

6

28

31

31

31

LP3 - 7

LP3 - 5

LP3 - 6

LP3 - 4

LP3 - 37 32LP3 - 50

LP3 - 36

LP3 - 48

LP3 - 39

LP3 - 40

LP3 - 41

43

43

4343

LP3 - 42

LP3 - 38

LP3 - 44

LP3 - 45

LP3 - 46

32

43

33

33

34

34LDP - 40

33

LDP - 41

35

34

LP3 - 31 LP3 - 32 LP3 - 33 LP3 - 34

LP3 - 35

36(TYP)

36(TYP)

37

LDP - 42LDP - 43

38

38

LDP - 46

LDP - 45

LDP - 44

AC,G

AC,G

AC,G

GG G

12

39

LP2 - 10

LP1 - 42

LP2 - 13

LP2 - 12

13

LDP - 49

38

INV2 INV1

MDP - 10LDP - 50

40

18

41

AC,G

AC,G

AC,G36 G 36 G

LP1 - 36

9

2 4 5 7

M

L

K

1

E301N

2

E301N

LP1 - 35

G G

28

1. RECEPTACLE FOR MICROWAVE IN HIGH CABINET; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.

2. RECEPTACLE FOR REFRIGERATOR. MOUNT 42" AFF BEHIND UNIT. SEE ARCHTECTURAL DETAILS.

3. RECEPTACLE FOR COPIER; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.

4. RECEPTACLE FOR WATER FOUNTAIN. COORDINATE FINAL LOCATION WITH FOUNTAIN INSTALLER. PROVIDE GFCI TYPE BREAKER IN PANEL.

5. WALL MOUNTED 20AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-20R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.

6. WALL MOUNTED 30AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-30R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.

7. NEW FLOOR BOX WITH POWER CONNECTION TO FURNITURE, 6" DIAMETER TYPE FLR BOX FLUSH IN FLR. COORDINATE EXACT LOCATION WITH ARCHITECT. ON GRADE, HINGED DIE-CAST ROUND ALUMINUM COVER WITH FURNITURE WHIP HOLE DOORS; BLACK FINISH COVER; INTERNAL DIVIDER; BASIS OF DESIGN WIREMOLD MODEL ##. BRANCH CIRCUIT FOR PWR 3/4”C WITH 9#12+1#12G ROUTED CONCEALED UNDER FLOOR, AND STUB UP INTO WALL TO GET TO CEILING, THEN EXTENDED TO POWER PANEL. CONNECT FLEXIBLE WHIP FURNISHED WITH THE FURNITURE. COORDINATE ACTUAL LOCATION WITH FURNITURE PROVIDER.

8. FLOOR BOX FOR DATA; FLUSH IN FLOOR. COORDINATE EXACT LOCATION WITH ARCHITECT. RECESSED CABLE CONNECTIONS; ON-GRADE METAL ASSEMBLY; HINGED DIE-CAST ALUMINUM COVER WITH CABLE DOORS; DUST GASKET; BLACK FINISH COVER; NO POWER PROVISIONS; BRACKETS FOR MULTIPLE DATA JACKS; COORDINATE AND PROVIDE DEVICE PLATES FOR CENTER DEVICES AND FOR SIDE MOUNT DEVICES. BASIS OF DESIGN WIREMOLD MODEL 8ATCBK. COORDINATE FINIAL COVER PLATE FINISH COLOR WITH COR. PROVIDE TWO 1.25"C FOR COMMUNICATION CABLES. EXTEND TWO 1.25”C FROM BOX, UP INTO CEILING. COORDINATE WORK WITH TECHNOLOGY DRAWINGS.

9. TWO COMPARTMENT SURFACE METAL WIREWAY MOUNTED ABOVE BACK SPLASH OF COUNTER. INSTALL DEVICES IN RACEWAY. PROVIDE A 1”C CONCEALED IN WALL FOR POWER, ROUTED UP INSIDE WALL. PROVIDE A 1.25”C FOR DATA WIRING FROM DATA COMPARTMENT, CONCEALED INSIDE WALL, UP INTO ACCESSIBLE CEILING. SEE LAB DRAWINGS. BASIS OF DESIGN: WIREMOLD ALA4800 SERIES ALUMINUM RACEWAY.

10. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#1. PROVIDE A DEDICATED 120V 20A RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A RECEPTACLE ON THE CEILING IN RM 116B; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON CEILING IN ROOM 116A. SEE ADDITIONAL NOTES FOR CORD REEL.

11. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#2. PROVIDE A DEDICATED 120V 30A, NEMA L5-30P (CONFIRM FINAL RECEPTACLE TYPE WITH NMDA); RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A RECEPTACLE ON THE CEILING IN RM 116B; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON CEILING IN ROOM 116A. SEE ADDITIONAL NOTES FOR CORD REEL.

12. ECEPTACLE FOR VENDING MACHINES. MOUNT AT 42” AFF. PROVIDE GFCI BREAKER; SEE PANEL SCHEDULE.

13. PROVIDE NEW SURFACE MOUNTED RECEPTACLE ON CEILING AND RETRACTABLE CORD REEL HUNG FROM CEILING. CORD REEL TO BE INDUSTRIAL RETRACTABLE 20FT EXTENSION CORD IN METAL REEL WITH FOUR 5-20R GROUNDED OUTLETS ALERT STAMPING ITEM #5020TF-4C OR EQUAL. PROVIDE ADJACENT CEILING MOUNTED EYE-BOLT AND SWAGED 1/8” STRANDED STEEL SAFETY CABLE THROUGH REEL YOKE WITH CARABINEER CLIP AS SECONDARY FALL PROTECTION.

14. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#3. PROVIDE A DEDICATED 120V 20A RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A SURFACE MOUNTED RECEPTACLE ON THE SIDE OF THE COMPARATOR CONCRETE BASE; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON SIDE OF BASE. COORDINATE WITH LAB DRAWINGS AND ARCHITECTURAL DETAILS..

15. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#4. PROVIDE A DEDICATED 120V 20A RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A SURFACE MOUNTED RECEPTACLE ON THE SIDE OF THE COMPARATOR CONCRETE BASE; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON SIDE OF BASE. COORDINATE WITH LAB DRAWINGS AND ARCHITECTURAL DETAILS..

16. SURFACE MOUNTED RECEPTACLE ON THE SIDE OF THE COMPARATOR CONCRETE BASE; EXTEND POWER FROM REMOTE UPS. SEE ADDITIONAL NOTES. SEE LAB DRAWINGS.

17. POWER TO OVERHEAD BRIDGE CRANE. PROVIDE DISCONNECT ON WALL AND POWER CONNECTION TO CRANE. COORDINATE WITH CRANE INSTALLER.

18. INVERTER FOR EMERGENCY LIGHTING, SEE LIGHTING PLAN.19. CONNECT CIRCUITS TO HOOD; FOR INTERNAL RECEPTACLES AND LIGHTS. TWO

120V 20A, EACH 2#12+1#12G. COORDINATE WITH HOOD INSTALLER.20. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR WITH

RECEPTACLES. BASIS OF DESIGN TECLAB DOUBLE SIDED DOUBLE PEDASTAL #EP-1313ABAF. PROVIDE (2) GFCI DUPLEX RECEPTACLE(S) ON EACH SIDE. SEE LAB DRAWINGS.

21. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR FOR DATA JACKS. BASIS OF DESIGN TECLAB DOUBLE SIDED SINGLE PEDASTAL #EP-1311ABAF. SEE DATA DRAWINGS FOR CABLING AND JACK REQUIREMENTS; COORDINATE WORK. SEE LAB DRAWINGS.

22. POWER FOR IRRIGATION CONTROL. COORDINATE FINAL LOCATION WITH IRRIGATION DRAWINGS. PROVIDE 2”C FROM CONTROLLER TO SITE HAND-HOLE; SEE SITE PLAN.

23. CONTROLS FOR ROLL-UP DOOR. PROVIDE FLUSH BACKBOX WITH CONDUIT AND WIRES TO DOOR MOTOR. COORDINATE FINAL LOCATION WITH NMSU. COORDINATE WITH DOOR INSTALLER.

24. OUTDOOR KEY OPERATED CONTROL STATION FOR ROLL-UP DOOR. PROVIDE FLUSH BACKBOX WITH CONDUIT AND WIRES TO DOOR MOTOR. COORDINATE FINAL LOCATION WITH NMSU. COORDINATE WITH DOOR INSTALLER.

25. POWER TO ROLL-UP DOOR. PROVIDE LOCATION 120V/1POLE 30A DISCONNECT SWITCH ADJACENT TO DOOR OPERATOR. SUPPORT DISCONNECT INDEPENDENTLY FROM DOOR. PROVIDE FLEX CONNECTION TO MOTOR. COORDINATE WITH DOOR INSTALLER.

26. CONTROLS FOR DOCK-LEVELER. PROVIDE FLUSH BACKBOX WITH CONDUIT AND WIRES TO CONTROLLER UNDER DOCK-LEVELER. COORDINATE FINAL LOCATION OF CONTROLS WITH NMSU. COORDINATE WITH DOCK-LEVELER INSTALLER.

27. POWER TO DOCK-LEVELER. PROVIDE LOCATION 208V/2POLE 30A DISCONNECT SWITCH ON WALL INSIDE VESTIBULE. PROVIDE 2#12+1#12G IN CONDUIT FROM DISCONNECT TO CONTROL UNIT UNDER LEVELER; PROVIDE LFMC FLEX CONNECTIONS TO MOTOR. COORDINATE WITH DOCK-LEVELER INSTALLER.

28. MOUNT ALL RECEPTACLES IN ROOM AT 36”AFF UNO.29. PALLET JACK CHARGING STATION. PROVIDE A DEDICATED 120V 30A, NEMA

L5-30P (CONFIRM FINAL RECEPTACLE TYPE WITH NMDA). SEE LAB DRAWINGS. 30. PALLET JACK CHARGING STATIONS. PROVIDE A DEDICATED 120V 20A. SEE LAB

DRAWINGS. 31. ALL RECEPTACLES IN ROOM ARE TO BE GFCI TYPE AND INSTALLED IN METAL

RACEWAY WHERE RACEWAYS ARE SHOWN ON WALL32. INSTALL RECEPTACLE IN LOWER CABINET FOR VACUUM PUMP INSIDE CABINET.

CONTROL RECEPTACLE BY SWITCH IN FACE OF CABINET, SEE CASEWORK DRAWINGS. COORDINATE WITH CASEWORK AND HOOD INSTALLER. SEE LAB DRAWINGS.

33. POWER CONNECTION FOR MOTORIZED DOOR OPENERS. PROVIDE CONTROL WIRING AND CONDUITS, SEE ET DRAWINGS FOR ADDITIONAL WORK. COORDINATE FINAL REQUIREMENTS WITH DOOR INSTALLER.

34. WALL MOUNTED PUSH BUTTON FOR MOTORIZED DOOR OPENER. PROVIDE CONDUIT UP INTO ACCESSIBLE CEILING, EXTEND TO DOOR CONTROLLER. SEE DETAILS. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

35. PUSH BUTTON FOR MOTORIZED DOOR OPENER, MOUNTED ON PEDASTAL. PROVIDE 1"C FROM PEDESTAL UNDER SLAB AND UP INTO CEILING CAVITY OF VESTIBULE, EXTEND TO DOOR CONTROLLER. SEE DETAILS. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

36. RECEPTACLE IN KNEE SPACE UNDER COUNTER, SEE LAB DRAWINGS.37. GROUND BAR ON WALL, 12”LONG X 2”HGH X 1/4"THICK COPPER ON STANDOFFS.

MOUNT ON WALL ABOVE TOP OF DRUMS; COORDIANTE FINAL MOUNTING HEIGHT. 1#6G BACK TO BLDG MAIN GROUND BUS.

38. POWER FOR ELECTRIC HAND DRYER. PROVIDE RECESSED BACK BOX AND FINAL CONNECTION; COORDINATE HEIGHT.

39. GROUND BAR ON WALL, 12”LONG X 2”HGH X 1/4"THICK COPPER ON STANDOFFS. MOUNT HIGH ON WALL ABOVE TOP OF TALL SHELVES; COORDIANTE FINAL MOUNTING HEIGHT. 1#6G BACK TO BLDG MAIN GROUND BUS.

40. EMERGENCY POWER INVERTER FOR DRUM STORAGE EXHAUST FAN. 2#10+1#10G.

41. EXHAUST FAN FOR DRUM STORAGE TO BE POWERED BY INVERTER INV2 TO PROVIDE EMERGENCY OPERATION OF FAN. EXTEND POWER BACK TO INV2 IN ELEC ROOM 115; PROVIDE 120V/30A/1POLE DISCONNECT ON WALL ABOVE INV2 TO CONTROL EF. COORDINATE WITH MECHANICAL CONTRACTOR.

SHEET KEYNOTES

NORTH

1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 6631/8" = 1'-0"2 ELECTRICAL POWER MEZZANINE

A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.

B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

C. SEE LAB DRAWINGS AND DETAILS FOR COORDINATIOND. SEE TECHNOLOGY DRAWINGS AND DETAILS FOR COORDINATION

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

(TYP)

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:57

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP101N

ELECTRICALPOWER FLOORPLAN - BLDG 663

Approver

19-0056.001

Author

GENERAL SHEET NOTES

.

DN

J

J

J

J

J

J

J

J

J

J

J

J

JJ

J

J J

J J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

1 2 3 4 5 7

M

L

K

J

H

G

F

E

D

C

B

A

LAB OFFICES

102

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

CORRIDOR

103

VEST

103A

MDF

T111

JAN

J109

M

R107B

W

R107A

VEND

104

U

R105

SEED LAB

110

COOL STOR

112B

KIT PREP

112C

ELEC

115 OIL/AFSTOR

112D

DRUM STOR

117

ENGINE LAB

112AMAIN LAB

112

MECH/BOILER

M119

CORRIDOR

101

DOCK STAGING

121

VESTIBULE

123STORAGE

118A

ECHELON LEVEL1 AND 2

116B

BV

116A

MECH

M116

RECEIPT DATAENTRY

116

LARGE MASS

118

PROVER STATION

120

HP2 LP2

TDPMDP LDP

LP3

CENTRALRECEIVING

114

LP1HP1

VAV-S1.4

VAV-S1.5

VAV-S1.1

VAV-S1.3

VAV-R1.4

VAV-R1.5

VAV-R1.2

VAV-S2.2VAV-S2.1

VAV-R1.3

VAV-S1.2

FCU-1.10

VAV-S2.3

VAV-S2.6

VAV-E1.5

VAV-S2.4

VAV-E2.4

VEV-2.2

VAV-E2.7a

VAV-E2.7b

VAV-S2.7

VAV-S2.6

VAV-E3.3

VAV-S3.5

VAV-S3.2

VAV-S3.3

VAV-S3.4

HP1 - 2

1

HP1 - 2

1

HP1 - 2

1

HP2 - 32

11

HP2 - 32

1

HP2 - 32

1

1

HP2 - 32

HP2 - 32

HP2 - 32

HP2 - 331HP2 - 33

1

HP2 - 331

HP2 - 331HP2 - 33

1

MDP - 81

MDP - 81 MDP - 81

MDP - 8

1

MDP - 8

1

MDP - 8

1

MDP - 8

1

MDP - 8

1MDP - 8

1

MDP - 9

1

MDP - 9

1

MDP - 9

1

MDP - 9

1

LDP - 47

2

LDP - 47

2

LP3 - 56

2

LP2 - 15

2

LP2 - 16

2LP2 - 16

2

LP1 - 44

2

FCU-1.3

FCU-1.1

LP1 - 50,52

LP1 - 45,47

LP1 - 46,48

LP1 - 49,51

3

3

3

3

HG-1.10

HG-1.5

HG-1.1

HG-1.3

HG-1.4

VAV-S3.1

MDP - 9

1

FCU-1.6

FCU-1.5

LP1 - 39,41

3

VAV-R1.1

VAV-E1.1

HP1 - 2

1

HP1 - 2

HP1 - 21

1

FCU-1.2

VAV-E2.5a

VAV-E2.5b

1

1

MDP - 8

MDP - 8

MDP - 9

1INV1INV2

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:27

:02

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP102N

ELECTRICALPOWER FLOORPLAN -BLDG 663 -MECH EQUIP

Approver

19-0056.001

Author

NORTH

1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 663 - MECHANICAL EQUIPMENT VIEW

GENERAL SHEET NOTES

1. POWER CONNECTION FOR MECHANICAL VAV UNIT. POWER AT 277V TO INTERNAL CONTROL TRANSFORMER PROVIDED WITH VAV. PROVIDE LOCAL SNAP SWITCH AS DISCONNECT MOUNTED WITH-IN 12” OF CONTROL PANEL ON UNIT. COORDINATE WITH MECHANICAL WORK.

2. POWER CONNECTION FOR MECHANICAL FCU UNIT. POWER AT 120V. PROVIDE LOCAL SNAP SWITCH AS DISCONNECT MOUNTED ON UNIT. COORDINATE WITH MECHANICAL WORK.

3. POWER CONNECTION TO ELECTRIC HUMIDIFIER. SEE MECHANICAL DRAWINGS. POWER AT 208V 1-PHASE. INSTALL DISCONNECT ON WALL AND PROVIDE FINAL CONNECTION TO UNIT.

SHEET KEYNOTES

A. COORDINATE FINAL LOCATION OF ALL EQUIPMENT WITH MECHANICAL AND PLUMBING CONTRACTORS.

B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

.

DN

1 2 3 4 5 7

M

L

K

J

H

G

F

E

D

C

B

A

LAB OFFICES

102

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

CORRIDOR

103VEST

103A

MDF

T111

JAN

J109

M

R107B

W

R107A

U

R105

VEND

104

ELEC

115

DRUM STOR

117

KIT PREP

112C

COOL STOR

112B

SEED LAB

110

OIL/AFSTOR

112D

ENGINE LAB

112A

MAIN LAB

112

DOCK STAGING

121

MECH/BOILER

M119

CENTRALRECEIVING

114

PROVER STATION

120

LARGE MASS

118

VESTIBULE

123 STORAGE

118A

ECHELON LEVEL1 AND 2

116B

BV

116A

RECEIPT DATAENTRY

116

MECH

M116

CORRIDOR

101

BAS PANEL

1

E301N

2

E301N

3

E301N

2 4 5 7

M

L

K

1

E301N

2

E301N

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:33

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EF101N

ELECTRICALTECHNOLOGYFLOOR PLAN -BLDG 663

Approver

19-0056.001

Author

A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.

GENERAL SHEET NOTES

1. FIRE ALARM CONTROL PANEL2. FIRE ALARM REMOTE ANNUNCIATOR

SHEET KEYNOTES

NORTH

1/8" = 1'-0"1 ELECTRICAL FIRE ALARM FLOOR PLAN - BLDG 6631/8" = 1'-0"2 ELECTRICAL TECHNOLOGY MEZZANINE

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

A. SCOPE OF WORK: INSTALL AN ADDRESSIBLE FIRE ALARM SYSTEM PER THE SPECIFICATIONS AND DRAWINGS. AUDIBLE NOTIFICATION IS HORN BASED. FIRE ALARM SUPERVISION IS REQUIRED FOR FIRE SPRINKLER FLOW.

B. PROVIDE A CODE COMPLIANT, NICET LEVEL III DESIGN TO BE APPROVED BY THE FIRE MARSHAL. PROVIDE DEVICES AS REQUIRED TO MEET ALL NATIONAL AND LOCAL CODE REQUIREMENTS.

C. FIRE ALARM SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL BE IN ACCORDANCE WITH NFPA 70, NFPA 72 AND IFC. SYSTEM IS TO MEET ALL APPLICABLE BUILDING CODES, FIRE CODES AND THE REQUIREMENS OF THE AUTHORITY HAVING JURISDICTION AND INSURANCE CARRIER. VERIFY REQUIREMENS PRIOR TO SHOP DRAWING SUBMITTAL.

D. INFORMATION ON CONTRACT DOCUMENTS IS FOR GENERAL INFORMATION AND BID PURPOSES ONLY. PERFORM REQUIRED CALCULATIONS AND FIELD COORDINATION AND PROVIDE ADDITIONAL DEVICES AS REQUIRED.

E. ADDITIONAL MATERIALS AND LABOR REQUIRED TO SUPPORT CHANGES REQUESTED BY THE AUTHORITY HAVING JURISDICTION SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

F. FLUSH MOUNT ALL NOTIFICATION AND SIGNALING DEVICES TO WALLS. G. DUCT SMOKE DETECTOR, FURNISHED BY DIVISION 28, INSTALLED IN DUCT BY

DIVISION 23, CONNECTED, WIRED AND TESTED BY DIVISION 28. PROVIDE DUCT DETECTORS IN NEW AND EXISTING UNITS WITH AIR MOVEMENT GREATER THAN 2000CFM. INSTALL PER CODE.

H. WHERE APPLICABLE DO NOT INSTALL SMOKE DETECTORS IN A DIRECT AIR FLOW OR CLOSER THAN 3 FEET FROM AN AIR SUPPLY DIFFUSOR OR RETURN AIR OPENING.

I. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.J. INSTALL WALL MOUNTED VISUAL NOTIFICATION DEVICES WITH THEIR BOTTOMS

MOUNTED AT 80”MINIMUM AND 96” MAXIMUM FROM FINISHED FLOOR. K. INSTALL WALL MOUNTED AUDIBLE NOTIFICATION DEVICES WITH THEIR TOPS

MOUNTED AT 90”MINIMUM AND 100” MAXIMUM FROM FINISHED FLOOR AND NO CLOSER THEN 6” TO A HORIZONTAL STRUCTURE.

L. THE CONTRACTOR SHALL ADJUST/INSTALL ALL DEVICES TO MAXIMIZE PERFORMANCE AND TO MINIMIZE FALSE ALARMS.

M. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN CONDUITTHROUGHOUTTHE PROJECT; FIRE ALARM RATED RED MC CABLE IS PERMITTED IN CONCEALED LOCATIONS ONLY. BARE\PLASTIC CABLES INSTALLED IN PLENUM SPACES ARE NOT ACCEPTABLE. ALL RACEWAYS TO BE A MINIMUM SIZE OF 3/4" OR LARGER AS REQUIRED BY THE FIRE ALARM MANUFACTURER.

N. SMOKE DETECTORS SHALL NOT BE ANY CLOSER THAN 1’ FROM FIRE SPRINKLERS.

O. COVER AND PROTECT ALL INSTALLED DEVICES FROM DAMAGE/CONTAMINATION WHILE CONSTRUCTION IS IN PROCESS UNTIL THAT AREA IS READY TO BE TURNED OVER TO THE OWNER.

P. PROVIDE A DEDICATED BRANCH CIRCUIT FOR FIRE ALARM EQUIPMENT. PROVIDE A RED LOCKING DEVICE ON THE BREAKER, TO BLOCK THE HANDLE IN THE “ON” POSITION. LABEL THE CIRCUIT BREAKER AS “FIRE ALARM CIRCUIT CONTROL”. PROVIDE A CIRCUIT ID LABEL ON FIRE PANEL/EXTENDERS. PROVIDE SURGE PROTECTION FOR CIRCUIT TO FIRE ALARM PANEL.

Q. THE INSTALLING CONTRACTOR SHALL PROVIDE A RECORD OF COMPLETION PER NFPA 72, (FIGURE 10.18.2.1.1. 22) CONTROL PANELS, REMOTE ANNUNCIATORS SHALL BE INSTALLED WITH THEIR TOP MOUNTED AT 48”.

R. OWNER SHALL BE RESPONSIBLE FOR ESTABLISHING A FIRE SYSTEM MONITORING CONTRACT OR PROVISIONS.

S. ARCHITECT/ENGINEER AND OWNER SHALL BE NOTIFIED A MINIMUM OF 48 HOURS PRIOR TO THE FINAL INSPECTION AND /OR TESTING.

T. UPON COMPLETION OF THE INSTALLATION OF THE SYSTEMS, A SATISFACTORY TEST OF THE ENTIRE SYSTEM SHALL BE MADE IN ACCORDANCE WITH THE SPECIFICATIONS.

U. SYSTEM DESIGN IS TO INCLUDE THE FOLLOWING MINIMUM REQUIREMENTS IN ADDITION TO ANY SPECIFIC LOCATION NOTED ON FLOOR PLANS.a. SMOKE DETECTION IN ALL CORRIDORS, ELECTRICAL ROOMS,

MECHANCIAL ROOMS, JANITOR CLOSETS, STORAGE ROOMSb. SMOKE DETECTORS AT ALL FIRE ALARM EQUIPMENT LOCATIONSc. FLOW AND TAMPER DEVICES FOR ALL FIRE SUPPRESSION DEVICESd. MONITORING CONNECTION TO FIRE SUPPRESSION SITE POST

INDICATING VALVEe. AUDIBLE AND VISUAL NOTIFICATION DEVICES THROUGHTOUT THE

INSIDE OF THE BUILDINGf. AUDIBLE AND VISUAL NOTIFICATION DEVICES FOR THE EXTERIOR

COURT YARDg. SMOKE DETECTORS IN THE SUPPLY AND RETURNS FOR ALL AIR

HANDLING EQUIPMENT RATED 2,000CFM OR GREATER.

FIRE ALARM GENERAL NOTES

1

2

1 2 3 4 5 7

M

L

K

J

H

G

F

E

D

C

B

A

N2

RTU

N3

RTU

3

EL121N

N1

RTU

2

2

1

2

MDP - 38,40,42

MDP - 44,46,48

MDP - 32,34,36

MDP - 37,39,41

1

E301N

2

E301N

3

E301N

LDP - 38 WG

WGLDP38

LP1 - 1

WG

LP1

1

WG

4

4

4

4

N2

HG

N3

HG

5LDP - 51

EQ

N1

5LDP - 52

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTIO

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:52

:42

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

EP141N

ELECTRICALPOWER ROOFPLAN - BLDG 663

Approver

19-0056.001

Author

A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR

MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

C. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, PLUMBING AND ARCHITECTURAL DETAILS.

D. PROVIDE 6” HIGH SUPPORT FOR ALL NEW RACEWAYS OF ROOF.

GENERAL SHEET NOTES

1. NEW LAB EXHAUST FAN (LEF). 480V 3-PHASE. 3#12 + 1#12G IN 3/4" C UNO. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.

2. POWER TO RTU, 480V 3-PHASE. 3#8 + 1#10G IN 3/4" C UNO. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.

3. POWER TO ERU, 480V 3-PHASE. 3#8 + 1#10G IN 3/4" C UNO. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.

4. PROVIDE WEATHERPROOF, GFCI TYPE POWER RECEPTACLE AT ROOF TOP UNIT. PROVIDE INDEPENDENT SUPPORT FORM UNIT. COORDINATE LOCATION WITH EQUIPMENT INSTALLED. CONSOLIDATE ROOF PENETRATIONS WHERE POSSIBLE AND ROUTE WITH OTHER PENETRATIONS.

5. POWER TO GAS FIRED HUMIDIFIER, 120V 1-PHASE. 2#12 + 1#12G IN 3/4" C. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.

SHEET KEYNOTES

NORTH

1/8" = 1'-0"1 ELECTRICAL POWER ROOF PLAN - BLDG 663

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

ALTERNATE #7

ALTERNATE #7

NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

643 TOP OF S PARAPET

119' - 0"

643 TOP OF N PARAPET

120' - 6"

NL TOP OF RIDGE

129' - 0"

MLK

RECEIPT DATAENTRY

116

PROVER STATION

120 NEW LAB LEVEL 1

100' - 0"

NL MEZZANINE

113' - 6"

643 TOP OF S PARAPET

119' - 0"

643 TOP OF N PARAPET

120' - 6"

NL TOP OF RIDGE

129' - 0"

LKJHGFE

3

EL121N

CORRIDOR

101

CORRIDOR

101

CORRIDOR

101

NEW LAB LEVEL 1

100' - 0"

1 2 3 4 5 7

LAB OFFICES

102

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:11

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E301N

ELECTRICALLIGHTINGSECTIONS - BLDG663

Approver

19-0056.001

Author

1/8" = 1'-0"1 EL121N -11/8" = 1'-0"2 EL121N -2

1/8" = 1'-0"3 EL121N - 3

3

4

1

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

2

J

J

FD

FD

JJ

2

D

MDF

T111

LDP - 30

LDP - 29

LDP - 32LDP - 31

LDP - 27

LDP - 33

LDP - 34

LDP - 28

1 2 3 4 5 7

H

G

DOCK STAGING

121

CORRIDOR

101

MECH/BOILER

M119

N1

DWH

CENTRALRECEIVING

114

N2

BP

BAS PANEL

N1

ERP

N1

HHWP

N2

HHWP

N2

CHWP

N1

CHWP

N1

GT

N2

ET

N1

ET

7

15

1

9

2

E301N

LP2HP2

HP2 - 1,3,5

HP2 - 2,4,6

HP2 - 13,15,17

HP2 - 7,9,11

HP2 - 8,10,12

LP2 - 7

LP2 - 9

LP2 - 1

LP2 - 2

2 2

1

2

N1

BP

HP2 - 14,16,18

LP2 - 3

LP2 - 4

1

LAC

11

913 15

8810 1112

14

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:13

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E401N

ELECTRICALPOWERENLARGEDPLANS - BLDG 663

Approver

19-0056.001

Author

GENERAL SHEET NOTES

1. WALL MOUNTED 20AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-20R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.

2. WALL MOUNTED 30AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-30R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.

3. TELECOMM GROUND BUS AND GROUND WIRE BACK TO MAIN GROUND BUS; SEE GROUNDING DIAGRAM ON E601

4. POWER FOR FIRE ALARM POWER SUPPLY PANEL. COORDINATE WITH SYSTEM INSTALLER.

5. POWER FOR ACCESS CONTROL SYSTEM + POWER SUPPLY PANEL. COORDINATE WITH COMMUNICATION SYSTEM DRAWINGS AND SYSTEM INSTALLER.

6. PROVIDE PLYWOOD ON ALL WALL OF NEW IDF ROOM. COVER ALL WALL WITH A/C GRADE PLYWOOD SHEATHING, 3/4" THICK, 8’0” X 4’0” PANELS MOUNTED VERTICALLY STARTING AT 6” A.F.F., PAINT WITH FIRE RETARDANT PAINT TO MATCH WALL COLOR.

7. ALL RECEPTACLES IN MECH\BOILER ARE TO BE GFCI TYPE. MOUNT 36”AFF.

8. POWER TO HEATING HOT WATER PUMPS; 20A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.

9. CHILLED WATER PUMPS; 20A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.

10. POWER TO ENERGY RECOVERY PUMP; 20A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.

11. PROVIDE POWER CONNECTIONS OF DOMESTIC HOT WATER HEATER AND CIRCULATION PUMP. COORDINATE CONNECTIONS WITH PLUMBING CONTRACTOR. PROVIDE SEPARATE MOTOR RATED SNAP SWITCH ADJACENT TO EACH UNIT AS LOCAL DISCONNECT.

12. POWER TO HVAC BMS CONTROL SYSTEM. COORDINATE FINAL LOCATION AND REQUIREMENTS WITH MECHANICAL CONTRACTOR.

13. LAB AIR COMPRESSOR CONNECTION; 20A-DELTA FEEDER. PROVIDE 30A/3P DISCONNECT ON WALL ADJACENT TO THE UNIT. COORDINATE FINAL WIRING REQUIREMENTS WITH PLUMBING CONTRACTOR.

14. EMERGENCY SHUTDOWN PUSH BUTTON FOR BOILERS. RED MUSHROOM BUTTON UNDER HINGED CLEAR PLASTIC COVER. BASIS OF DESIGN PILA ST120ES WITH ACCESSORY PILCLHCOV1 OR EQUAL. COORDINATE WITH CONTROLS CONTRACTOR AND MECHANICAL CONTRACTOR.

15. POWER TO BOILER; 2#10+1#10G FEEDER. INSTALL DISCONNECT ON WALL AND EXTEND TO BOILER. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.

SHEET KEYNOTES

A. COORDINATE WORK WITH ALL TRADES PRIOR TO INSTLATTTION.B. SEE MECHANICAL AND PLUMBING SHEETS FOR ADDITIONAL INFORMATION

REGARDING EQUIPMENT LAYOUTS AND LOCATIONS.C. LOCATE ALL ELECTRICAL EQUIPMENT TO PROVIDE NEC REQUIRED

CLEARANCES. D. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL

EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.

E. COORDINATE WITH COMMUNICATION SYSTEM DRAWINGS FOR ADDITIONAL REQUIREMENTS.

KEY PLAN

NO

RT

H

AREAM

AREAC

AREAN

663

643

330

12

1/4" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN -ENLARGED MDF T111

1/4" = 1'-0"2 MECHANICAL ENLARGED PLAN - NEW BLDG 1

HHWSHHWRCHWSCHWRUNDERGROUND TO BUILDING 643

CHWS & CHWR UNDERGROUND CAMPUS CHILLED WATER SYSTEM.

1

4

5

6

6

STUB CONDUIT 2" ABOVECONCRETE BASE

MAKE ABSOLUTELY LEVEL

REFER TOLIGHT FIXTURESCHEDULE

GRADECONCRETE BASE #3000 PSI

1.5" PVC COND. (TYP)

1" CHAMFER ALL AROUND

POLE BASE

BOND ALL CONDUIT, POLEAND POLE BASE

30" MIN.

ANCHORBOLTS PVC

SEE STRUCTURALDETAILS FOR DEPTH(MIN. DEPTH 42")

8#6 VERT.HOOK ONEEND

MINIMUM OF#3 TIES AT 12"OCSEE STRUCTURALDETAILS

POLE BASE

BOND ALL CONDUIT, POLEAND POLE BASE

HAND HOLE

GRADE

NOTE: ALL PULL BOXES ARE TYPE "A" UNLESS NOTED OTHERWISE

DEPTH, SEE SCHEDULE

EXTEND CONDUITS 4"ABOVE BOTTOM, (2"ABOVE GRAVEL)

WIDE SWEEP BEND 6" CRUSH STONE BASE (2B CLEAN)

PULL BOX SCHEDULE

SIZE

13Wx13Lx18D

17Wx30Lx24D

TYPE

A

B

BURRY MARKER TAPE 12"BELOW FINISHED GRADE

POLYMER CONCRETESTACKABLE BOX, WITHOPEN BOTTOM

2" GRAVEL AT BOTTOM

1.5" PVC COND. (TYP)

30" MIN.POLE DEPTH(MIN. DEPTH 48")

PVC

24" DIA.

C5LIGHT POLE BASE DETAIL - CONCRETE BASE

E5LIGHT POLE BASE DETAIL - DIRECT BURY

E3HAND HOLE DETAIL

C2

A5A2

3/4" C. TO PREVIOUS INTRUSION ALARM DEVICE

120VAC

PWRSUPPLY

BACK TO CONTROLLER

J-BOX

3/4" CONDUIT. FOR POWER HINGE. IF APPLICABLE.FINISHEDCEILING

3/4" CONDUIT (TYPICAL)

FINISHEDFLOOR

3/4" CONDUIT (TYPICAL)

120VAC

PWRSUPPLY

J-BOX

FINISHEDCEILING

BACK TO CONTROLLER

ACCESS CONTROL TYPICAL ROUGH-IN DETAIL - DOUBLE DOORSCALE: NTS

ACCESS CONTROL TYPICAL ROUGH-IN DETAIL - SINGLE DOORSCALE: NTS

BACK TO CONTROLLER

J-BOX

3/4" CONDUIT. FOR POWER HINGE. IF APPLICABLE.

MOTORIZED DOOR OPERATOR TYPICAL ROUGH-IN DETAIL - DOUBLEDOOR

FINISHEDCEILING

DOOR OPERATOR

3/4" C. TO PREVIOUS INTRUSION ALARM DEVICE

120VAC

PWRSUPPLY

SCALE: NTS

SCALE: NTS

SCALE: NTS

SCALE: NTS

3/4" C. TO NEXT INTRUSIONALARM DEVICE POWER SUPPLY BY DOOR

HARDWARE CONTRACTOR

3/4" CONDUIT(TYPICAL) TO DOOROPERATOR

PUSH BUTTON ON OPP. SIDE OFWALL (REQ'S 4 SQ. DEEP W/ SINGLE

GANG RING) UP 48" A.F.F. TO TOP (IFREQUIRED)

PUSH BUTTON (REQ'S 4 SQ. DEEP W/SINGLE GANG RING) UP 48" A.F.F. TO TOP

(IF REQUIRED)

CRASH BAR PART# BY DOORHARDWARE CONTRACTOR.

CRASH BARPART# BYDOORHARDWARECONTRACTOR.

3/4" C. TO NEXT INTRUSIONALARM DEVICE

BACK-BOX LOCATED ABOVEACCESSIBLE CEILING SPACE

POWER SUPPLY BY DOORHARDWARE CONTRACTOR

REQUEST TO EXIT MOTION DETECTOR ONEGRESS SIDE OF WALL. (REQ'S 4 SQ. DEEPW/ SINGLE GANG RING MOUNTEDHORIZONTAL )

3/4" CONDUIT (TYPICAL) TORTE MOTION DETECTOR.

(AS APPLICABLE) 24DC MAG LOCK BYDOOR HARDWARE CONTRACTOR IFAPPLICABLE.

3/4" CONDUIT (TYPICAL) FORPOWER HINGE. IF APPLICABLE.

CRASH BAR PART# BY DOOR HARDWARECONTRACTOR.

CRASH BAR PART# BY DOORHARDWARE CONTRACTOR.

CARD READER (REQ'S 4 SQ. DEEP W/SINGLE GANG RING) UP 48" A.F.F. TO TOP

(IF REQUIRED)

CARD READER OR RQE BUTTON ON

OPP. SIDE OF WALL (REQ'S 4

SQ. DEEP W/ SINGLE GANG RING) UP 48"

A.F.F. TO TOP (IF REQUIRED)

REQUEST TO EXIT MOTION DETECTOR ONEGRESS SIDE OF WALL. (REQ'S 4 SQ. DEEP W/SINGLE GANG RING MOUNTED HORIZONTAL )

3/4" CONDUIT. FOR POWERHINGE. IF APPLICABLE.

CRASH BAR PART# BYHARDWARE

CONTRACTOR.

POWER SUPPLY BY DOORHARDWARE CONTRACTOR

3/4" C. TO NEXT INTRUSIONALARM DEVICE

3/4" C. TO PREVIOUSINTRUSION ALARM DEVICE

BACK-BOX LOCATED ABOVEACCESSIBLE CEILING SPACE

3/4" CONDUIT (TYPICAL) TORTE MOTION DETECTOR.

CARD READER (REQ'S 4 SQ W/SINGLE GANG RING) MOUNTEDAT +48" A.F.F. TO TOP.

RQE BUTTON ON OPP. SIDE OFWALL (REQ'S 4 SQ. DEEP W/SINGLE GANG RING) UP 48" A.F.F.TO TOP (IF REQUIRED)

24v DC ELECTRICAL STRIKE BYDOOR HARDWARE CONTRACTOR.

BACK-BOX LOCATED ABOVEACCESSIBLE CEILING SPACE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:14

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E501

ELECTRICALDETAILS

MG

19-0056.001

PU

LIGHTING CONTROL SCHEDULE AND DIAGRAMS

LEGEND FOR LIGHTING CONTROL DIAGRAMSSYMBOL DISCRIPTION

OFAPPLICATION

SMALL ROOM1 (OFFICE W/ WINDOW)

OS

S

277V

SMALL ROOM

2 (OFFICE NO WINDOW)OS

S

FINISHED CEILING

277V

3 NURSE LOBBY

OS

S

1" CONDUIT

4 NURSE COTS

S

S

S

S

S

S

CD

277V277V

CORRIDOR

RCDa

Db

D

D

D

DS

5

STORAGE, JANITOR,RESTROOM

M

277V277V S OS

D 11EXTERIOR

(TIME CLOCK W/OS OVERRIDE)

S

OSC (EXTERIOR)

D LCP LIGHTING CONTROL PANEL WITHASTRONOMICAL TIME CLOCK.

ROOM LTG

AC LTG

COT

COT

COT

COT

9 (TIME CLOCK W/OS OVERRIDE)

RC

OS

277V

OPEN OFFICE10 (TIME CLOCK W/

OS OVERRIDE)

S

OSC

D

RC RC

RCGENERIC SYMBOL FOR LIGHT FIXTURE, SEEPLAN FOR QUANTITY

LINE VOLTAGE WIRING

LOW VOLTAGE WIRING

ROOM CONTROL PANEL(CONCEALED ABOVE CEILING)

PUSH BUTTON. SEE FLOOR PLAN NOTES.

SK

STYPE 'C'MULTIPLE SENSORSALONG LENGTH OFCORRIDOR, SEE PLAN

S

RC

8GANGED TOILET 277V OS

DSK S

BD

OSD

7

AD

RC

OSMANUAL CONTROL

(EX. ELEC CLOSET, MECHRM, TECH RM)

277V SC

6

277V

BLOCKDIAGRAM OF

SYSTEM

RC

MEDIUM ROOM(EX. CONFERENCE, SMALL

CLASSROOM, FRONTDESK)

SDa

OS AS

OSB

Db

B: CEILING MOUNTED OCCUPANCY SENSOR,-LV WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO OCCUPANCY MODE.

C: CEILING MOUNTED OCCUPANCY SENSOR,-DAYLIGHT SENSOR,-LV WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO OCCUPANCY MODE.

D: CEILING MOUNTED OCCUPANCY SENSOR,-LINE VOLTAGE WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO OCCUPANCY MODE.

WALL SWITCH-LINE VOLTAGE

WALL SWITCH-LINE VOLTAGE-KEY OPERATED

D

WALL SWITCH-LOW VOLTAGE-DIMMING, ON\OFF, RAISE\LOWER +INDICATOR

MMOMENTARY OVERRIDE SWITCH-LOW VOLTAGE

SYMBOL DISCRIPTIONOF

APPLICATION

277V

BLOCKDIAGRAM OF

SYSTEM

RC

OSA

A: CEILING MOUNTED OCCUPANCY SENSOR,-DAYLIGHT SENSOR,-LV WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO VACANTCY MODE.

SCALE: NTS SCALE: NTS

CEILING

12"

11

TV LOCATION

9

8

10

7 56

121 11

2

3

4

CL 9

8

10

7 56

6" ABOVE DOOR

121

2

3

4

COMPLY WITH NFPA-72 LIMIT OFTOP OF STROBE LAMP TO BE MAXOF 80"AFF

COMPLY WITH ADA LIMIT OF 48"AFF MAXTO OPERABLE HANDLE 6" TO CENTERLINE

BACK SPLASH

COUNTERTOP

FLOOR

SCALE: NTS

MA

X 6

'-7"

TO

CE

NT

ER

OF

HIG

HE

ST

BR

EA

KE

R/H

AN

DL

EP

ER

NE

C 4

04.8

MIN

UM

IN

18

" AF

F

UN

0

80

"

ST

RO

BE

ST

OB

E/H

OR

N

42

"

ST

OB

E/B

ELL

WA

LL

PH

ON

E

18

"

FIR

E A

LA

RM

MA

NU

AL

ST

AT

ION

SW

ITC

HO

UT

LE

T

DA

TA

SP

EC

IAL

PU

RP

OS

EO

UT

LE

T

TE

LE

PH

ON

E D

AT

A

EP

O

PU

SH

BU

TT

ON

/INT

ER

CO

M/V

UL

UM

N C

ON

TR

OL/E

TC

VE

RIF

Y W

/ AR

CH

ITE

CT

OU

TL

ET

DA

TA

DATA OUTLET DETAIL LIGHTING CONTROL DIAGRAM

DEVICE MOUNTING HEIGHT DETAIL

D1 D3

A1

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:14

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E502

ELECTRICALDETAILS

MG

19-0056.001

PU

B CA D F LB1 LB2 LB3 LB4

2003P

2003P

2003P

2003P

BLDG 643

6003P

6003P

MCC

2003P

2003P

6003P

SDP!

4003P

4003P

4003P

MDP, 1600A, 120/208V 3-PHASE, 4 WIRE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:14

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E601CM

ELECTRICAL DIAG- BLDG 330 + 643

Approver

19-0056.001

Author

GENERAL SHEET NOTESA. xx

SHEET KEYED NOTES

GENERAL SHEET NOTES

1. xx

1SINGLE LINE DIAGRAM - BLDG 330 & 6431/8" = 1'-0"

MM M

PANEL - LDP400A, 120/208V, 3P, 4W22KAIC

CAMPUS ELECTRICAL

DISTRIBUTION UTILITY

WNMUEXTERIORPAD MOUNTED XFMR

277/480V 3∅, SECONDARY

400Y

PROVIDE THREE GROUNDINGELECTRODE RODS AND TESTWELLS SEPARATED 10' APART

PROVIDE #1/0 INSULATEDCOPPER GROUNDINGELECTRODE CONDUCTOR IN3/4" CONDUIT TO WATERSERVICE PIPE

MAIN GROUND

#1/0

#2/0

PROVIDE 20'-0" LONG BARE #1/0 CU GROUNDING ELECTRODE (UFER) IN THE BUILDING FOUNDATION; ENCASED IN MINIMUM 2" OF CONCRETE ON ALL SIDES.

BUILDING STEEL

60A3P

SPD

100A3P

100A3P

LP2 LP3

100A3P

LP1

400A3P

100Y 100Y 100Y

PANEL - MDP400A, 277/480V, 3P, 4W65KAIC

TDL112.55kVA277/480V TO 120/208V

225Δ

400Y

400A3P

225A3P

60A3P

SPD

RTU-N2RTU-N1 RTU-N3

20A3P

##A3P

100A3P

##A3P

100A3P

##A3P

100A3P

##Δ

##Δ

20A3P

20A3P

30A3P

20A3P

15A3P

15A3P

15A3P

30A3P

#6

#6

#2/0

PIPE CONDUIT

CABLE TRAY

TELECOMGRND BAR

MPANELBOARD GROUND BUS

#2/0

#2/0

4

1

2

3

M

5

5

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:15

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E601N

ELECTRICALDIAGRAMS -BLDG 663

Approver

19-0056.001

Author

GENERAL SHEET NOTESA. SEE SPECIFICATIONS FOR ELECTRICAL SYSTEM STUDY AND ARC FLASH

ANALYSIS REQUIREMENTS.B. COORDINATE INSTALLATION AND REQUIREMENTS OF ELECTRICAL SERVICE

WITH NMSU UTILITY COMPANY. C. SEE CALCULATED FAULT CURRENT TABLE. THE CALCULATED AVAILABLE

SHORT CIRCUIT CURRENT AT FAULT POINT IS TO BE TREATED AS A MINIMUM VALUE, SELECT AND PROVIDE ALL EQUIPMENT TO EXCEED THE RESULT VALUES LISTED IN THE TABLE. TABLE VALUES ARE BASED ON EXPECTED LENGTHS, CONDUCTOR MATERIAL, CONDUCTOR SIZE, IMPEDANCE, CONDUIT MATERIAL, ETC. CONTRACTOR AND VENDOR TO PROVIDE FINAL ARC FLASH STUDY PER SPECIFICATION 260573. COORDINATE FINAL EQUIPMENT SELECTION AND RATING WITH CONTRACTOR PROVIDED STUDY.

D. INFORMATION SHOWN IS DIAGRAMMATIC, AND IS NOT INTENDED TO REPRESENT PHYSICAL ARRANGEMENTS OR LOCATIONS. ROUTING, CONNECTIONS AND PHYSICAL LAYOUTS ARE TO BE PER FIELD CONDITIONS AND AS INDICATED ELSEWHERE IN THE ELECTRICAL PLANS.

E. NEW NMSU UTILITY OWNED PAD MOUNTED TRANSFORMER. PROVIDE PAD PER NMSU REQUIREMENTS. COORDINATE LOCATION AND INSTALLATION WITH NMSU AND ALL SITE WORK. SEE SITE DRAWINGS.

F. BOND EQUIPMENT WITH EQUIPMENT BONDING JUMPER AND SIZE PER NEC.

SHEET KEYED NOTES

GENERAL SHEET NOTES

1. NEW UNIVERSITY OWNED UTILITY PAD MOUNTED TRANSFORMER. PROVIDE PAD AND VAULT PER PNM REQUIREMENTS. COORDINATE LOCATION AND INSTALLATION WITH NMSU AND ALL SITE WORK. SEE SITE DRAWINGS.

2. MAIN DISTRIBUTION PANEL MDP IS LOCATED IN THE MAIN ELECTRICAL ROOM.3. NEW PRIMARY ELECTRICAL SERVICE TO BE PROVIDED BY NMSU TO NMSU

OWNED TRANSFORMER. NMSU WILL EXTEND A NEW PRIMARY FEEDER, SEE SITE PLAN. COORDINATE INSTALLATION OF NEW SERVICE WITH NMSU.

4. NMSU ELECTRICAL METER ON SECONDARY SIDE OF TRANSFORMER; CT’S INSIDE TRANSFORMER; COORDINATE INSTALLATION WITH NMSU.

5. SURGE PROTECTION DEVICE (SPD) INTEGRAL TO GEAR.

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:16

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E701

ELECTRICALSCHEDULES

Approver

19-0056.001

Author

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:17

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E702C

ELECTRICALSCHEDULES

Approver

19-0056.001

Author

Notes:

Total Est. Demand: 137 A

Lighting 1999 VA 100.00% 1999 VA Total Conn.: 159 A

Power 28600 VA 100.00% 28600 VA Total Est. Demand: 49212 VA

Spare 540 VA 100.00% 540 VA Total Conn. Load: 57322 VA

Receptacle 26220 VA 69.07% 18110 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 199 A 164 A 125 A

Total Load: 23217 VA 19060 VA 15046 VA

71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 6663 6461 6259 6057 5855 Power - glycol pump 20 A 1 750 VA 450 VA 1 20 A Power VAVs 5653 (EX) Hot Water Pump 20 A 1 0 VA 1400... 5451 1400... 1400... 5249 1400... 1400...

3 20 A Receptacle - ICP-MS C110- UPS50

47Receptacle - ICP-MS C110- UPS 20 A 3

1400... 4500... 4845 1150... 4500... 4643

Receptacle - ICP-MS C110 20 A 21150... 4500...

3 60 A Receptacle - ICP-MS C110- UPS44

41 Lighting Space 101,112,113,114 20 A 1 869 VA 0 VA 1 20 A (EX) Fire Alarm Bell 4239 Receptacle - ICP-MS C110 20 A 1 540 VA 1500... 4037 1250... 1500...

2 30 A Receptacle - ICP-MS C11038

35Receptacle - ICP-MS C110 20 A 2

1250... 180 VA 1 20 A (EX) Drinking Fountain 3633 1500... 360 VA 1 20 A Receptacle - ICP-MS C110 3431

Receptacle - ICP-MS C110 30 A 21500... 360 VA 1 20 A (ex) Restroom receptacles 32

29 Receptacle - ICP-MS C110 20 A 1 360 VA 180 VA 1 20 A Receptacle - ICP-MS C110 3027 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 2825 Receptacle - Instrument C108 20 A 1 360 VA 0 VA 1 20 A Spare 2623 Receptacle - Instrument C108 20 A 1 180 VA 180 VA 1 20 A Receptacle - Instrument C108 2421 Receptacle - Instrument C108 20 A 1 1800... 1800... 1 20 A Receptacle - Instrument C108 2219 Receptacle - Instrument C108 20 A 1 1800... 1800... 1 20 A Receptacle - Instrument C108 2017 Receptacle - Instrument C108 - column 20 A 1 400 VA 400 VA 1 20 A Receptacle - Instrument C108 - column 1815 Receptacle - Instrument C108 - column 20 A 1 400 VA 400 VA 1 20 A Receptacle - Instrument C108 1613 Receptacle - Instrument C108 - column 20 A 1 1800... 1200... 1 20 A Receptacle - Instrument C108 - column 1411 Receptacle - Instrument C108 - column 20 A 1 1200... 1800... 1 20 A Receptacle - Instrument C108 - column 129 Receptacle - Instrument C108 20 A 1 780 VA 780 VA 1 20 A Receptacle - Instrument C108 107 Receptacle - Instrument C108 20 A 1 540 VA 360 VA 1 20 A Receptacle - Instrument C108 85 250 VA 500 VA 63

Power C108 Fume hood 20 A 2250 VA 500 VA

2 20 A Power C110 Fume hood4

1 Lighting Space 110 20 A 1 360 VA 780 VA 1 20 A Lighting Space 108 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Recessed Wires: 4 Mains Rating: 200 A

Supply From: (E) SDP2 Phases: 3 Mains Type:

Location: Space 127 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: (E) LB1

Notes:

Total Est. Demand: 51 A

Total Conn.: 51 A

Power 12700 VA 100.00% 12700 VA Total Est. Demand: 18510 VA

Spare 4010 VA 100.00% 4010 VA Total Conn. Load: 18510 VA

Receptacle 1800 VA 100.00% 1800 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 56 A 56 A 45 A

Total Load: 6525 VA 6565 VA 5420 VA

71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 300 VA 100 VA 1 20 A (EX) Control Panel HVAC 6663 300 VA 250 VA 1 20 A (EX) Main Entry Door Operator 6461

Power - roof ERU pump 20 A 3300 VA 250 VA 1 20 A (EX) Venturi Exhaust 62

59 3300... 100 VA 1 20 A (EX) Butterfly Exhaust 6057 3300... 100 VA 1 20 A EX) EMS Panel 5855

Power - LEF 60 A 33300... 250 VA 1 20 A (EX) West Door Operator 56

53 100 VA 1 20 A (EX) Unit Heater 5451 180 VA 1 20 A (EX) Exterior Receptacles 5249 180 VA 1 20 A (EX) Exterior Receptacles 5047 800 VA 4845 800 VA 4643

(EX) RTU SAF-2 VFD 45 A 3800 VA 44

41 4239 4037 3835 3633 3431 3229 3027 2825 2623 2421 2219 100 VA 1 20 A (EX) Fire Alarm Control Panel 2017 1815 1613 1411 Receptacle 20 A 1 180 VA 129 Power VAV - Lab C106 20 A 1 550 VA 600 VA 1 20 A Power 107 Power Fire Alarm FACP 20 A 1 100 VA 400 VA 1 20 A Power VAVs 85 Receptacle - Entry C101 20 A 1 180 VA 360 VA 1 20 A Receptacle - Entry C101 63 Receptacle - IT closet 20 A 1 360 VA 125 VA 41 Receptacle - IT closet 20 A 1 720 VA 125 VA

2 20 A Receptacle - IT closet2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Recessed Wires: 4 Mains Rating: 200 A

Supply From: (E) SDP2 Phases: 3 Mains Type:

Location: Space 113 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: (E) LB2

Notes:

Total Est. Demand: 50 A

Lighting 840 VA 100.00% 840 VA Total Conn.: 50 A

Power 5200 VA 100.00% 5200 VA Total Est. Demand: 18118 VA

Spare 2650 VA 100.00% 2650 VA Total Conn. Load: 18118 VA

Receptacle 9460 VA 100.00% 9460 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 46 A 51 A 56 A

Total Load: 5471 VA 6000 VA 6650 VA

71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6663 6461 6259 6057 5855 5653 5451 5249 5047 4845 4643 4441 4239 4037 3835 250 VA 1 20 A (EX) Exhaust Fan 3633 3431 3229 3027 2825 2623 1500... 2421

Receptacle Wash C102 - dryer 20 A 21500... 22

19 Receptacle Wash C102 20 A 1 180 VA 1100... 2017 Receptacle Wash C102 20 A 1 1800... 1100...

2 20 A jbox Wash C102 washer18

15 Receptacle Wash C102 - vac 20 A 1 1000... 540 VA 1 20 A Receptacle Wash C102 1613 Receptacle Balance C106B 20 A 1 900 VA 720 VA 1 20 A Receptacle Balance C106B 1411 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 129 Receptacle Sample C103 20 A 1 600 VA 360 VA 1 20 A Receptacle Sample C103 107 Receptacle Sample C103 20 A 1 360 VA 600 VA 1 20 A Receptacle Sample C103 85 800 VA 1200... 1 20 A Receptacle Sample C103 63 800 VA 1200... 1 20 A Receptacle Sample C103 41

(EX) RTU SAF-1 VFD 45 A 3800 VA 840 VA 1 20 A Lighting Space 132 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Recessed Wires: 4 Mains Rating: 200 A

Supply From: (E) SDP2 Phases: 3 Mains Type:

Location: Space 132 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: (E) LB3

Notes:

Lighting 660 VA 100.00% 660 VA Total Est. Demand: 109 A

Power 20900 VA 100.00% 20900 VA Total Conn.: 130 A

Spare 180 VA 100.00% 180 VA Total Est. Demand: 39309 VA

Receptacle 25000 VA 70.00% 17500 VA Total Conn. Load: 46809 VA

Lighting - Dwelling Unit 100 VA 100.00% 100 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 135 A 118 A 142 A

Total Load: 15910 VA 14150 VA 16750 VA

71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6663 6461 6259 6057 5855 5653 Receptacle Grind 105B 20 A 1 360 VA 5451 Receptacle Grind 105B 20 A 1 1000... 360 VA 1 20 A Receptacle Grind 105B 5249 Receptacle Grind 105B 20 A 1 1000... 1000... 1 20 A Receptacle Grind 105B 5047 (EX) Rooftop Recept 20 A 1 180 VA 1250... 4845 Receptacle Grind 105B 20 A 1 1000... 1250...

2 20 A Receptacle Grind 105B46

43 Receptacle Grind 105B 20 A 1 360 VA 1200... 1 20 A Receptacle Grind 105B 4441 Receptacle Lab C105A 20 A 1 1200... 180 VA 1 20 A Receptacle Lab C105A 4239 Receptacle Lab C105A 20 A 1 360 VA 360 VA 1 20 A Receptacle Lab C105A 4037 Receptacle Space 132 20 A 1 360 VA 1200... 1 20 A Receptacle Space 132 3835 Receptacle Lab 132 - island 20 A 1 1200... 1200... 1 20 A Receptacle Lab 132 - island 3633 Receptacle Lab 132 - island 20 A 1 1200... 360 VA 1 20 A Receptacle Lab 132 - island 3431 Receptacle Space 132 20 A 1 1200... 360 VA 1 20 A Receptacle Lab 132 - island 3229 Receptacle Lab 132 - island 20 A 1 360 VA 1200... 1 20 A Receptacle Lab 132 - island 3027 Receptacle Lab 132 - island 20 A 1 1560... 720 VA 1 20 A Receptacle Lab 132 - island 2825 Receptacle Lab 132 - island 20 A 1 1560... 1560... 1 20 A Receptacle Lab 132 - island 2623 2700... 720 VA 1 20 A Receptacle Lab 132 - island 2421

Power - Lab Micro Digester 20 A 22700... 180 VA 1 20 A Receptacle - Lab extra recept 22

19 2700... 180 VA 1 20 A Receptacle - Lab Oven (B) 2017

Power - Lab Furnace - coordinate final breaker si... 40 A 22700... 1500... 1 20 A Receptacle - Lab Oven (A) 18

15 Receptacle - Vacuum Oven 20 A 1 600 VA 500 VA 1613 500 VA 500 VA

2 20 A Power C105A Fume hood14

11Power C105A Fume hood 20 A 2

500 VA 500 VA 129 500 VA 500 VA

2 20 A Power C106 Fume hood10

7Power C106 Fume hood 20 A 2

500 VA 500 VA 85 500 VA 500 VA

2 20 A Power C106 Fume hood6

3Power C106 Fume hood 20 A 2

500 VA 500 VA 41 Lighting Space 111 20 A 1 760 VA 500 VA

2 20 A Power C106 Fume hood2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Recessed Wires: 4 Mains Rating: 200 A

Supply From: (E) SDP2 Phases: 3 Mains Type:

Location: Space 132 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: (E) LB4

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:18

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E703C

ELECTRICALSCHEDULES

Approver

19-0056.001

Author

Notes:

Lighting 3495 VA 100.00% 3495 VA Total Est. Demand: 318 A

Power 67400 VA 100.00% 67400 VA Total Conn.: 391 A

Spare 7380 VA 100.00% 7380 VA Total Est. Demand: 114518 VA

Receptacle 62480 VA 58.00% 36240 VA Total Conn. Load: 140758 VA

Lighting - Dwelling Unit 100 VA 100.00% 100 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 428 A 384 A 366 A

Total Load: 51120 VA 45775 VA 43866 VA

17 18

15 16

13 14

11 1675... 6650... 12

9 1415... 6000... 10

7

(E) LB4 200 A 3

1591... 5471...

3 200 A (E) LB3

8

5 5420... 1504... 6

3 6565... 1906... 4

1

(E) LB2 200 A 3

6525... 2321...

3 200 A (E) LB1

2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Recessed Wires: 4 Mains Rating: 600 A

Supply From: Phases: 3 Mains Type:

Location: Space 127 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: (E) SDP2

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:19

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E704N

ELECTRICALSCHEDULES

Approver

19-0056.001

Author

Notes:

Total Est. Demand: 206 A

Lighting 13239 VA 100.00% 13239 VA Total Conn.: 245 A

Power 115750 VA 100.00% 115750 VA Total Est. Demand: 171431 VA

Receptacle 74480 VA 56.71% 42240 VA Total Conn. Load: 203671 VA

Lighting - Dwelling Unit 252 VA 100.00% 252 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 262 A 252 A 228 A

Total Load: 71728 VA 68855 VA 63087 VA

53 500 VA 1120... 54

51 500 VA 1145... 52

49

HP1 100 A 3

800 VA 1155...

3 100 A HP2

50

47 3111... 4200... 48

45 3766... 4200... 46

43

TDP 225 A 3

4091... 4200...

3 30 A RTU-N2

44

41 5100... 4200... 42

39 5100... 4200... 40

37

RTU-1N offices 20 A 3

5100... 4200...

3 30 A RTU-1

38

35 800 VA 36

33 800 VA 34

31 800 VA

3 15 A LEF-N1

32

29 0 VA 30

27 0 VA 28

25

SPD 60 A 3

0 VA 26

23 24

21 22

19 20

17 18

15 16

13 14

11 12

9 Power Open Office VAVs 20 A 1 300 VA 800 VA 1 20 A Power - INV1 LTG 10

7 Lighting CORRIDOR 101 20 A 1 420 VA 550 VA 1 20 A Power MAIN LAB 112 - vav 8

5 Lighting LARGE MASS 118 20 A 1 3957... 2069... 1 20 A Lighting LAB OFFICES-1 102-1 6

3 Lighting MECH/BOILER M119 20 A 1 2273... 1580... 1 20 A Lighting PROVER STATION 120 4

1 Lighting CORRIDOR 103 20 A 1 1065... 2171... 1 20 A Lighting ENGINE LAB 112A 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 400 A

Mounting: Surface Wires: 4 Mains Rating: 400 A

Supply From: Phases: 3 Mains Type:

Location: ELEC 115 Volts: 480/277 Wye A.I.C. Rating:

Branch Panel: MDP

Notes:

Total Est. Demand: 215 A

Total Conn.: 304 A

Total Est. Demand: 77440 VA

Power 35200 VA 100.00% 35200 VA Total Conn. Load: 109680 VA

Receptacle 74480 VA 56.71% 42240 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 349 A 322 A 259 A

Total Load: 40910 VA 37660 VA 31110 VA

83 2280... 1114... 8481 2830... 1154... 8279

LP2 100 A 34480... 1541...

3 100 A LP380

77 8990... 7875 1133... 7673

LP1 100 A 37110... 74

71 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 Power - rooftop humidifier 20 A 1 4200... 400 VA 1 20 A Power - rooftop humidifier 5249 Power U R105 elec hand dryer 20 A 1 950 VA 950 VA 1 30 A Power - INV2 5047 Power MDF T111 -FCU 20 A 1 500 VA 500 VA 1 20 A Power - site water service hot box heater 4845 Receptacle LAB OFFICES break area 20 A 1 180 VA 180 VA 1 20 A Receptacle LAB OFFICES break area 4643 Power W R107A elec hand dryer 20 A 1 950 VA 360 VA 1 20 A Receptacle LAB OFFICES-1 102-1 4441 Power CORRIDOR 101 door motor 20 A 1 250 VA 950 VA 1 20 A Power M R107B elec hand dryer 4239 Receptacle - east exterior 20 A 1 180 VA 500 VA 1 20 A Power VEST 103A - door motor 4037 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle Roof 3835 Power - site water service hot box heater 20 A 1 500 VA 720 VA 1 20 A Receptacle 3633 Power MDF T111 - FACP 20 A 1 250 VA 250 VA 1 20 A Power MDF T111 - Access Control 3431 Receptacle MDF T111 20 A 1 1500... 1500... 1 30 A Receptacle MDF T111 - 30A 3229 Receptacle MDF T111 20 A 1 360 VA 360 VA 1 20 A Receptacle MDF T111 3027 Receptacle MDF T111 20 A 1 360 VA 360 VA 1 20 A Receptacle MDF T111 2825 Receptacle VEND 104 - Provide GFCI breaker 20 A 1 400 VA 400 VA 1 20 A Receptacle VEND 104 - Provide GFCI breaker 2623 Receptacle Space 102-22 20 A 1 180 VA 720 VA 1 20 A Receptacle Space 102-22 2421 Receptacle Space 102-22 20 A 1 180 VA 180 VA 1 20 A Receptacle Space 102-22 2219 533 VA 180 VA 1 20 A Receptacle Space 102-22 2017 533 VA 800 VA 1815

Receptacle Cubicle 20 A 3533 VA 800 VA 16

13 533 VA 800 VA3 20 A Receptacle Cubicle

1411 533 VA 533 VA 129

Receptacle Cubicle 20 A 3533 VA 533 VA 10

7 Receptacle VEST 103A 20 A 1 1260... 533 VA3 20 A Receptacle Cubicle

85 Receptacle LAB OFFICES-4 102-4 20 A 1 180 VA 1080... 1 20 A Receptacle LAB OFFICES-4 102-4 63 Receptacle OFFICE 102A 20 A 1 1440... 900 VA 1 20 A Receptacle LAB OFFICES-1 102-1 41 Receptacle OFFICE 102D 20 A 1 1260... 1080... 1 20 A Receptacle OFFICE 102C 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Surface Wires: 4 Mains Rating: 100 A

Supply From: TDP Phases: 3 Mains Type:

Location: ELEC 115 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: LDP

Notes:

Total Est. Demand: 77 A

Total Conn.: 106 A

Total Est. Demand: 27670 VA

Power 7250 VA 100.00% 7250 VA Total Conn. Load: 38090 VA

Receptacle 30840 VA 66.21% 20420 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 129 A 97 A 93 A

Total Load: 15410 VA 11540 VA 11140 VA

83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 250 VA 1 20 A Power - FCU 5653 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 5451 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 5249 Spare 20 A 1 0 VA 1500... 1 20 A Receptacle MAIN LAB 112 - vac 5047 Spare 20 A 1 0 VA 1500... 1 20 A Receptacle SEED LAB 110 4845 Receptacle SEED LAB 110 20 A 1 720 VA 360 VA 1 20 A Receptacle SEED LAB 110 4643 Receptacle SEED LAB 110 20 A 1 900 VA 720 VA 1 20 A Receptacle SEED LAB 110 4441 Receptacle SEED LAB 110 20 A 1 1500... 1500... 1 20 A Receptacle SEED LAB 110 4239 Receptacle SEED LAB 110 20 A 1 1500... 1500... 1 20 A Receptacle SEED LAB 110 4037 Receptacle MAIN LAB 112 - vac 20 A 1 1500... 1500... 1 20 A Receptacle SEED LAB 110 -vac 3835 Receptacle MAIN LAB 112 20 A 1 360 VA 1500... 1 20 A Receptacle SEED LAB 110 3633 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 3431 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 3229 500 VA 500 VA 3027

Power MAIN LAB 112 - hood recept 20 A 2500 VA 500 VA

2 20 A Power MAIN LAB 112 - hood recept28

25 Receptacle MAIN LAB 112 20 A 1 720 VA 900 VA 1 20 A Receptacle KIT PREP 112C 2623 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 2421 Receptacle MAIN LAB 112 20 A 1 360 VA 180 VA 1 20 A Receptacle MAIN LAB 112 2219 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 2017 Receptacle MAIN LAB 112 20 A 1 720 VA 360 VA 1 20 A Receptacle MAIN LAB 112 1815 Receptacle MAIN LAB 112 20 A 1 720 VA 720 VA 1 20 A Receptacle MAIN LAB 112 1613 Receptacle MAIN LAB 112 20 A 1 720 VA 720 VA 1 20 A Receptacle MAIN LAB 112 1411 Receptacle MAIN LAB 112 20 A 1 360 VA 720 VA 1 20 A Receptacle MAIN LAB 112 129 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 107 Receptacle ENGINE LAB 112A - ICE MACHINE 20 A 1 1500... 0 VA 1 20 A Spare 85 Receptacle ENGINE LAB 112A 20 A 1 360 VA 540 VA 1 20 A Receptacle ENGINE LAB 112A 63 Power ENGINE LAB 112A - Engine accessories 30 A 1 2500... 540 VA 1 20 A Receptacle ENGINE LAB 112A 41 Power ENGINE LAB 112A - Engine accessories 30 A 1 2500... 540 VA 1 20 A Receptacle ENGINE LAB 112A 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Surface Wires: 4 Mains Rating: 200 A

Supply From: LDP Phases: 3 Mains Type:

Location: Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: LP3

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

NOT FOR CONSTRUCTION

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%CONSTRUCTION

DOCUMENTS

10/12/2020

4343 Pan American Fwy NE, Suite 239

Albuquerque, New Mexico 87107 USA

505.877.4499 main - 512.744.4444 fax

www.eeace.com

EEA Project No. #V20200032

CONSULTING ENGINEERS

10

/9/2

02

0 6

:26

:20

PM

NM

SU

NM

DE

PT

OF

AG

RIC

UL

TU

RE

NE

W C

ON

ST

RU

CT

ION

/ R

EN

OV

AT

ION

LA

S C

RU

CE

S, N

EW

ME

XIC

O

E705N

ELECTRICALSCHEDULES

Approver

19-0056.001

Author

Notes:

Total Est. Demand: 2 A

Total Conn.: 2 A

Total Est. Demand: 1800 VA

Total Conn. Load: 1800 VA

Power 1800 VA 100.00% 1800 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 3 A 2 A 2 A

Total Load: 800 VA 500 VA 500 VA

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 24

21 22

19 20

17 18

15 16

13 14

11 12

9 10

7 8

5 500 VA 6

3 500 VA 4

1

Power LARGE MASS 118 20 A 3

500 VA 300 VA 1 20 A Power PROVER STATION 120 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 250 A

Mounting: Recessed Wires: 4 Mains Rating: 100 A

Supply From: MDP Phases: 3 Mains Type:

Location: LARGE MASS 118 Volts: 480/277 Wye A.I.C. Rating:

Branch Panel: HP1

Notes:

Total Est. Demand: 41 A

Total Conn.: 41 A

Total Est. Demand: 34200 VA

Total Conn. Load: 34200 VA

Power 34200 VA 100.00% 34200 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 42 A 41 A 40 A

Total Load: 11550 VA 11450 VA 11200 VA

53 54

51 52

49 50

47 48

45 46

43 44

41 42

39 40

37 38

35 36

33 Power MECH/BOILER M119 20 A 1 250 VA 34

31 2700... 300 VA 1 20 A Power CENTRAL RECEIVING 114 32

29 2700... 2700... 30

27

Power ENGINE LAB 112A - Engine start 15 A 3

2700... 2700... 28

25 VAV POWER 20 A 1 50 VA 2700...

3 15 A Power ENGINE LAB 112A - Engine start

26

23 24

21 22

19 20

17 900 VA 1300... 18

15 900 VA 1300... 16

13

ERP-N1 15 A 3

900 VA 1300...

3 20 A LAC-1 (3HP)

14

11 900 VA 900 VA 12

9 900 VA 900 VA 10

7

HHWP-N1 (2HP) 15 A 3

900 VA 900 VA

3 15 A HHWP-N2 (2HP)

8

5 900 VA 900 VA 6

3 900 VA 900 VA 4

1

CHWP-N1 (2HP) 15 A 3

900 VA 900 VA

3 15 A CHWP-N2 (2HP)

2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 250 A

Mounting: Surface Wires: 4 Mains Rating: 200 A

Supply From: MDP Phases: 3 Mains Type:

Location: MECH/BOILER M119 Volts: 480/277 Wye A.I.C. Rating:

Branch Panel: HP2

Notes:

Total Est. Demand: 67 A

Total Conn.: 76 A

Total Est. Demand: 23990 VA

Power 10550 VA 100.00% 10550 VA Total Conn. Load: 27430 VA

Receptacle 16880 VA 79.62% 13440 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 59 A 97 A 77 A

Total Load: 7110 VA 11330 VA 8990 VA

83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 850 VA 850 VA 5249

Power MECH M116 - H3N 20 A 2850 VA 850 VA

2 20 A Power - H4N50

47 850 VA 850 VA 4845

Power MECH M116 20 A 2850 VA 850 VA

2 20 A Power MECH M11646

43 250 VA 1 20 A Power FCU 4441 850 VA 540 VA 1 20 A Receptacle 4239

Power MECH M116 20 A 2850 VA 40

37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 3835 Receptacle PROVER STATION 120 20 A 1 360 VA 360 VA 1 20 A Receptacle PROVER STATION 120 3633 Receptacle PROVER STATION 120 20 A 1 540 VA 720 VA 1 20 A Receptacle PROVER STATION 120 3431 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 3229 Receptacle LARGE MASS 118 20 A 1 180 VA 0 VA 1 20 A Spare 3027 Receptacle LARGE MASS 118 20 A 1 360 VA 180 VA 1 20 A Receptacle LARGE MASS 118 2825 Receptacle LARGE MASS 118 20 A 1 360 VA 360 VA 1 20 A Receptacle LARGE MASS 118 2623 Receptacle LARGE MASS 118 - UPS 20 A 1 500 VA 500 VA 1 20 A Receptacle LARGE MASS 118 - UPS 2421 Receptacle LARGE MASS 118 20 A 1 720 VA 720 VA 1 20 A Receptacle LARGE MASS 118 2219 Receptacle - Pallet Jack - 20A 20 A 1 180 VA 540 VA 1 20 A Receptacle L ARGE MASS 118 - west wall 2017 Receptacle - Pallet Jack - 30A 30 A 1 1500... 180 VA 1 20 A Receptacle - Pallet Jack - 20A 1815 Receptacle RECEIPT DATA ENTRY 116 20 A 1 900 VA 1080... 1 20 A Receptacle RECEIPT DATA ENTRY 116 1613 Receptacle BV 116A - UPS 30 A 1 1500... 360 VA 1 20 A Receptacle MECH M116 1411 Receptacle BV 116A 20 A 1 360 VA 1000... 1 20 A Receptacle BV 116A 129 Receptacle BV 116A 20 A 1 540 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B east 107 Receptacle ECHELON LEVEL 1 AND 2 116B 20 A 1 540 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B east 85 600 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B west 63

PROVER roll-up door 20 A 2600 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B west 4

1 Receptacle LARGE MASS 118 20 A 1 360 VA 600 VA 1 20 A Large Mass roll-up door 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Recessed Wires: 4 Mains Rating: 100 A

Supply From: LDP Phases: 3 Mains Type:

Location: Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: LP1

Notes:

Total Est. Demand: 27 A

Total Conn.: 27 A

Total Est. Demand: 9590 VA

Power 5450 VA 100.00% 5450 VA Total Conn. Load: 9590 VA

Receptacle 4140 VA 100.00% 4140 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 38 A 24 A 19 A

Total Load: 4480 VA 2830 VA 2280 VA

53 54

51 52

49 50

47 48

45 46

43 44

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 24

21 22

19 20

17 18

15 Power CORRIDOR 101 20 A 1 250 VA 500 VA 1 20 A Power CORRIDOR 101 FCU 16

13 Receptacle CENTRAL RECEIVING 114 20 A 1 720 VA 720 VA 1 20 A Receptacle CORRIDOR 101 14

11 Receptacle DOCK STAGING 121 20 A 1 540 VA 540 VA 1 20 A Receptacle CENTRAL RECEIVING 114 12

9 BOILER BP-N1 20 A 1 1000... 180 VA 1 20 A Receptacle - west exterior 10

7 BOILER BP-N2 20 A 1 1000... 600 VA 8

5 Dock roll-up door 20 A 1 600 VA 600 VA2 20 A Dock leveler

6

3 DWH + CP 20 A 1 800 VA 100 VA 1 20 A BMS CONTROL PANEL 4

1 Receptacle MECH/BOILER M119 20 A 1 720 VA 720 VA 1 20 A Receptacle MECH/BOILER M119 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 1 A

Mounting: Surface Wires: 4 Mains Rating: 100 A

Supply From: LDP Phases: 3 Mains Type:

Location: MECH/BOILER M119 Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: LP2

DRAWING LIST

COMMUNICATION NOTESGENERAL NOTES

ABBREVIATIONS

LEGENDGROUNDING AND BACKBONE CABLING DIAGRAM

GRADE LEVEL

BUILDING 643 SERVER ROOM

BUILDING GROUNDING

ELECTRODE SYSTEM

BUILDING 663

MAIN ELECTRICAL ROOM

BUILDING 663 MDF ROOM

1

T301

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:38pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

001.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T001

LEGEND

AND NOTES -

COMMUNICATIONS

DN

W

W

W

W

W

W

W

W

W

W

W

W

G

G

G

G

GG

M

H

SS

SS

SS

SS

SS

W

W

G

CO

SD

CO

SD

CO

SD

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

W

SS

T301

1

BUILDING 663

BUILDING 643

BUILDING 330

(RENOVATION SPACE)

·

·

·

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:38pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

100.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T100

SITE PLAN -

COMMUNICATIONS

1" = 30'-0"A3

SITE PLAN - COMMUNICATIONSNORTH

EQ & STOR

C107

CHEM & FLAM

STOR

C106A

BALANCE RM

C106B

INSTRUMENT

RM

C108

WASHING

C102

CHEMISTRY

LAB

C106

BV

C105

CLEAN LAB

C105A

GRINDING

C105B

SA

MP

LE

S

TO

R

C103

RECEIPT &

DATA ENTRY

C101

W

CR112

M

CR113

MECH

CM114

STOR

CS111

ICP-MS

C110

FIRE

C109

(E)2 (E)1(E)3(E)4(E)5

(E)C

(E)B

(E)A.1

J-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

K

J-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

K

J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK

D3

T101C

WALL RACK

NEW L

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:38pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

101.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T101C

BUILDING 643

PLANS -

CHEMISTRY -

COMMUNICATIONS

1/8" = 1'-0"A3

BUILDING 643 PLANS - CHEMISTRY - COMMUNICATIONSNORTH

1" = 1'-0"D3

BUILDING 643 - LOCKABLE CABINET AND SECURITY WALL FIELD

SECURITY

UP

MARKETING

M136

STOR

MA101

(E)1

(E)A.1

J-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

K

J-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

KJ-H

OO

K

J-HOOK J-HOOK J-HOOK J-HOOK

AV

P

FP

D

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:38pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

101.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T101M

BUILDING 330

PLANS -

MARKETING -

COMMUNICATIONS

1/8" = 1'-0"A4

BUILDING 330 PLANS - MARKETING - COMMUNICATIONSNORTH

.

DN

DN

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

STORAGE

118A

COOL STOR

112B

KIT PREP

112C

SEED LAB

110

M

R107B

W

R107A

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

ECHELON

LEVEL 1 AND 2

116B

PROVER

STATION

120

ELEC

115

OIL/AF

STOR

112D

MDF

T111

ENGINE LAB

112A

DRUM STOR

117

MAIN LAB

112

JAN

J109

LAB OFFICES

102

CENTRAL

RECEIVING

114

VESTIBULE

123

DOCK STAGING

121

RECEIPT DATA

ENTRY

116

LARGE MASS

118

MECH

M116

BV

116A

VEST

103A

CORRIDOR

103

CORRIDOR

101

VEND

104

U

R105

MECH/BOILER

M119

C

65421

B

A

7

M

L

K

J

H

F

E

D

G

31.7 6.3

H.1

G.5

K.8

2.61.2

AVP

FPD

T301

1

J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK

J-HOOK J-HOOK J-HOOK J-HOOK

J-H

OO

K

J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK

J-H

OO

KJ-H

OO

K

12"x4"

12"x4"

12"x4"

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:38pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

101.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T101N

BUILDING 663

PLANS - NEW LAB -

COMMUNICATIONS

1/16" = 1'-0"A3

BUILDING 663 PLANS - NEW LAB - COMMUNICATIONSNORTH

RE

LA

Y R

AC

KR

ELA

Y R

AC

K

BUILDING 663 MDF ROOM - PLAN VIEW

1

SCALE: 1/2" = 1'-0"

SE

CU

RIT

Y

FRONT

RACK VIEW

2

SCALE: NOT TO SCALE

RELAY RACK RELAY RACK

3

T301

6

T301

5

T301

4

T301

2

T301

OSP FIBER

24 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

CABLE MANAGEMENTCABLE MANAGEMENT

SECURITY

FRONT

SECTION VIEW

3

SCALE: 1/2" = 1'-0"

SECTION VIEW

4

SCALE: 1/2" = 1'-0"

SECTION VIEW

5

SCALE: 1/2" = 1'-0"

SECTION VIEW

6

SCALE: 1/2" = 1'-0"

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:39pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

301.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T301

TELECOM ROOM

DETAILS -

COMMUNICATIONS

Not to Scale

2

OMNI DIRECTIONAL WIRELESS ANTENNA DETAIL

Not to Scale

4

POWER AND DATA OUTLET DETAIL

Not to Scale

8

FPD AND AVP ROUGH-IN DETAIL

Not to Scale

7

FLOOR BOX CONDUIT PATHWAY

W

A

L

L

W

A

L

L

W

A

L

L

Not to Scale

3

COMMUNICATIONS OUTLET DETAIL

Not to Scale

6

POWER AT BACK OF RELAY RACK DETAIL

Not to Scale

5

WALL MOUNTED WIRELESS OUTLET DETAIL

Not to Scale

9

STACKED J-HOOK PATHWAY AS REQUIRED

INTERIOR CEILING

IN

TE

RIO

R W

AL

L

16" 16"

16"

16"

66" U

NLESS

IN

DICATED

DIFFEREN

TLY O

N

DRAW

IN

GS

AVP

FINISHED FLOOR LEVEL

D

E

C

K

G

Y

P

C

E

I

L

I

N

G

T

O

C

A

B

L

E

T

R

A

Y

Not to Scale

1

WIRELESS ACCESS POINT AT GYP/HARD CEILING

W

L

A

L

DECK

TO CABLE TRAY

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:39pm

Where:P

:\A

ustin\N

MS

U N

MD

A\D

atacom

-C

om

munications\T

401.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

T401

GENERAL

DETAILS -

COMMUNICATIONS

ABBREVIATIONS

LEGENDSECURITY NOTESNOT USED

SECURITY RISER

DRAWING LIST

X

SC301

LOCAL AREA

NETWORK

BUILDING 663

TELECOM

PATCH PANEL

TELECOM

SWITCH GEAR

T111

DATA

GATHERING

PANELS

CARD READER

DOOR POSITION SWITCH

REQUEST TO EXIT

TELECOM

PATCH PANEL

TELECOM

SWITCH GEAR

BUILDING 643

C101

DATA

GATHERING

PANELS

SURVEILLANCE CAMERA

CAM

INTERCOM_SYSTEM

CARD READER

DOOR POSITION SWITCH

REQUEST TO EXIT

SURVEILLANCE CAMERA

CAM

ACCESS CONTROL

SERVER

NETWORK VIDEO

RECORDER

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:45pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C001.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC001

LEGEND AND

NOTES -

SECURITY

EQ & STOR

C107

CHEM & FLAM

STOR

C106A

BALANCE RM

C106B

INSTRUMENT

RM

C108

WASHING

C102

CHEMISTRY

LAB

C106

BV

C105

CLEAN LAB

C105A

GRINDING

C105B

SA

MP

LE

S

TO

R

C103

RECEIPT &

DATA ENTRY

C101

W

CR112

M

CR113

MECH

CM114

STOR

CS111

ICP-MS

C110

FIRE

C109

E106

E109

EM

114

E101

E113

E112

E110

C105B

C105A

C105

C106B

C103

C101

E248

C106A

C107

E111

(E)2 (E)1(E)3(E)4(E)5

(E)C

(E)B

(E)A.1

4

SC301

1

SC301

1

SC302

7

SC301

4

SC301

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:45pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C101.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC101C

BUILDING 643

PLANS -

CHEMISTRY -

SECURITY

1/8" = 1'-0"A3

BUILDING 643 PLANS - CHEMISTRY - SECURITYNORTH

UP

MARKETING

M136

STOR

MA101

E186

E188

E192

E197

E198

E199

E200

E201

E202

(E)1

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:45pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C101.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC101M

BUILDING 330

PLANS -

MARKETING -

SECURITY

1/8" = 1'-0"A4

BUILDING 330 PLANS - MARKETING - SECURITYNORTH

.

DN

DN

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

STORAGE

118A

COOL STOR

112B

KIT PREP

112C

SEED LAB

110

M

R107B

W

R107A

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

ECHELON

LEVEL 1 AND 2

116B

PROVER

STATION

120

ELEC

115

OIL/AF

STOR

112D

MDF

T111

ENGINE LAB

112A

DRUM STOR

117

MAIN LAB

112

JAN

J109

LAB OFFICES

102

CENTRAL

RECEIVING

114

VESTIBULE

123

DOCK STAGING

121

RECEIPT DATA

ENTRY

116

LARGE MASS

118

MECH

M116

BV

116A

VEST

103A

CORRIDOR

103

CORRIDOR

101

VEND

104

U

R105

MECH/BOILER

M119

121B

120A

121A

114A

102C

102B

102A

110

115

102D

121C

112C

J109

112A

R107AR107B

T111

103

112D

114B

M119

103A

116

120B

118

123A

123B

117

112E

118A

R105

101A

102

112

112B

E299

123C

E183

E140

E207

C

65421

B

A

7

M

L

K

J

H

F

E

D

G

31.7 6.3

H.1

G.5

K.8

2.61.2

4

SC301

3

SC301

3

SC301

1

SC301

2

SC301

2

SC301

2

SC301

4

SC301

2

SC301

1

SC301

4

SC301

9

SC301

8

SC301

9

SC301

7

SC301

7

SC301

8

SC301

8

SC301

6

SC301

9

SC301

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

AREA M

AREA

C

AREA

N

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:46pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C101.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC101N

BUILDING 663

PLANS - NEW LAB -

SECURITY

1/8" = 1'-0"A3

BUILDING 663 PLANS - NEW LAB - SECURITYNORTH

OVERHEAD MONITORED DOOR

9

SCALE: Not to Scale

FINISHED FLOOR

UNSECURE SIDE

SECURE SIDE

WALL

FINISHED FLOOR

WALL

SECURE SIDE

SECURE SIDESECURE SIDE

UNSECURE SIDE

SECURE SIDE

SINGLE MONITORED DOOR

7

SCALE: Not to Scale

DOUBLE MONITORED DOOR

8

SCALE: Not to Scale

EXTERIOR MONITORED ROOF HATCH

6

SCALE: Not to Scale

FALSE CEILING

FINISHED FLOOR

WALL

UNSECURE SIDE

SECURE SIDE

UNSECURE SIDE

SINGLE ELEC. LOCK CARD READER DOOR

1

SCALE: Not to Scale

FALSE CEILING

FINISHED FLOOR

UNSECURE SIDE

SECURE SIDE

UNSECURE SIDE

WALL

SINGLE EXIT DEVICE CARD READER DOOR

2

SCALE: Not to Scale

DOUBLE EXIT DEVICE CARD READER DOOR

3

SCALE: Not to Scale

DOUBLE ELEC. LOCK CARD READER DOOR W/ INACTIVE LEAF

4

SCALE: Not to Scale

FALSE CEILING

FINISHED FLOOR

UNSECURE SIDE

SECURE SIDE

WALL

SECURE SIDE

SINGLE EXIT DEVICE MONITORED DOOR

5

SCALE: Not to Scale

FALSE CEILING

FINISHED FLOOR

UNSECURE SIDE

SECURE SIDE

UNSECURE SIDE

WALL

UNSECURE SIDEUNSECURE SIDE

FALSE CEILING

FINISHED FLOOR

UNSECURE SIDE

SECURE SIDE

WALL

UNSECURE SIDE

DECK

SECURE SIDE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:46pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C301.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC301

DOOR

ELEVATION

DETAILS -

SECURITY

OVERHEAD MONITORED DOOR

9

SCALE: Not to Scale

SINGLE MONITORED DOOR

7

SCALE: Not to Scale

DOUBLE MONITORED DOOR

8

SCALE: Not to Scale

EXTERIOR MONITORED ROOF HATCH

6

SCALE: Not to Scale

SINGLE ELEC. LOCK MULLION CARD READER DOOR

1

SCALE: Not to Scale

SINGLE EXIT DEVICE CARD READER DOOR

2

SCALE: Not to Scale

DOUBLE EXIT DEVICE CARD READER DOOR

3

SCALE: Not to Scale

DOUBLE ELEC. LOCK CARD READER DOOR W/ INACTIVE LEAF

4

SCALE: Not to Scale

SINGLE EXIT DEVICE MONITORED DOOR

5

SCALE: Not to Scale

S

T

O

R

EF

R

O

N

T

FINISHED FLOOR

STOREFRONT

FALSE CEILING

UNSECURE SIDE

SECURE SIDE

WALL

UNSECURE SIDE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:46pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C302 - D

OO

R E

LE

VA

TIO

N D

ET

AILS

- S

EC

UR

IT

Y.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC302

DOOR

ELEVATION

DETAILS -

SECURITY

W

A

L

L

LOCK POWER

SUPPLY

1P

1N

2P

2N

3P

3N

4P

4N

ON OFF

PO

WE

R D

IS

TR

IB

UT

IN

G

UN

IT

MAIN FUSE

N P

S

SW

1

L G

N

3.5

A 2

50

V

BA

T F

AIL N

C C

N

O N

C C

N

O A

C F

AIL

VR

1A

C

1

2V

-C

LO

SE

D

2

4V

-O

PE

N

DC

+BAT- -DC+

DEVICE

POWER

SUPPLY

1P

1N

2P

2N

3P

3N

4P

4N

ON OFF

PO

WE

R D

IS

TR

IB

UT

IN

G

UN

IT

MAIN FUSE

N P

S

SW

1

L G

N

3.5

A 2

50

V

BA

T F

AIL N

C C

N

O N

C C

N

O A

C F

AIL

VR

1A

C

1

2V

-C

LO

SE

D

2

4V

-O

PE

N

DC

+BAT- -DC+

DEVICE

POWER

SUPPLY

1P

1N

2P

2N

3P

3N

4P

4N

ON OFF

PO

WE

R D

IS

TR

IB

UT

IN

G

UN

IT

MAIN FUSE

N P

S

SW

1

L G

N

3.5

A 2

50

V

BA

T F

AIL N

C C

N

O N

C C

N

O A

C F

AIL

VR

1A

C

1

2V

-C

LO

SE

D

2

4V

-O

PE

N

DC

+BAT- -DC+

DATA

GATHERING

PANEL

DATA

GATHERING

PANEL

TYPICAL CARD READER DETAIL ( )

1

SCALE: Not to Scale

MONITORED DOOR POSITION SENSOR ( )

2

SCALE: Not to Scale

VIDEO INTERCOM MASTER STATION DETAIL ( )

3

SCALE: Not to Scale

WALL MOUNTED IP CAMERA DETAIL ( )

4

SCALE: Not to Scale

ACCESSIBLE CEILING MOUNTED IP CAMERA DETAIL ( )

5

SCALE: Not to Scale

PENDANT MOUNTED IP CAMERA DETAIL ( )

6

SCALE: Not to Scale

DECK MOUNTED CAMERA ( )

7

SCALE: Not to Scale

TYPICAL SECURITY WALL FIELD

9

SCALE: Not to Scale

W

A

L

L

W

A

L

L

D

R

O

P

C

E

I

L

I

N

G

D

E

C

K

D

E

C

K

W

A

L

L

D

E

C

K

INTERCOM DOOR STATION ( )

8

SCALE: Not to Scale

W

A

L

L

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PROJECT

REVISIONS

SHEET NO

DRAWING NAME

SEAL

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

95%

CONSTRUCTION

DOCUMENTS

10/12/2020

NM

SU

N

M D

EP

T O

F A

GR

IC

UL

TU

RE

NE

W C

ON

ST

RU

CT

IO

N / R

EN

OV

AT

IO

N

LA

S C

RU

CE

S, N

EW

M

EX

IC

O

DF

19-0056.001

Who: R

andy C

ottingham

When: O

ct 08, 2020 - 02:47pm

Where:P

:\A

ustin\nm

su nm

da\datacom

-security\S

C401.dw

g

Th

is d

ra

win

g a

nd

d

esig

n is th

e in

te

lle

ctu

al p

ro

pe

rty o

f D

ata

Co

m D

esig

n G

ro

up

. a

nd

its clie

nts.

No

e

ntity/p

erso

n sh

all m

ake

co

pie

s a

nd

/o

r m

od

ifica

tio

ns to

th

is file

w

ith

ou

t w

ritte

n p

erm

issio

n b

y D

ata

Co

m

De

sig

n G

ro

up

. T

his d

ra

win

g sh

all n

ot b

e u

se

d fo

r p

urp

ose

s o

th

er th

an

a

s in

te

nd

ed

fo

r th

is p

ro

je

ct. ©

2

02

0

voice | data | audio | video | security | acoustics

| | |

AUSTIN SAN ANTONIO HOUSTON DALLAS

P: (512) 478-6001 F: (512) 478-2771

DATA COM

DESIGN GROUP

© 2020 DataCom Design Group.

voice | data | audio | video | security | acoustics

|

|

|

AU

ST

IN

SA

N A

NT

ON

IO

HO

US

TO

ND

AL

LA

S

P: (512) 478-6001 F

: (512) 478-2771

DATA

CO

M

DESIG

N G

RO

UP

JH

SC401

GENERAL

DETAILS -

SECURITY

A

BBAL BALANCEBDNG BEDDINGBKG BACKINGBLDG BUILDINGBLKG BLOCKINGBO_ BOTTOM OFBOT BOTTOMBRKT BRACKETBSC BIOLOGICAL SAFETY CABINETBSL-# BIOLOGICAL SAFETY LEVEL (NUMBER)

C

D

D DEEP, DEPTHDEG DEGREEDET DETAILDIA DIAMETERDIM DIMENSIONDIV DIVISIONDN DOWNDWG DRAWING(S)

EE EASTEA EACHEL ELEVATIONELEC ELECTRIC(AL)EMER EMERGENCYENGR ENGINEERENVIR ENVIRONMENT(AL)EP ELECTRICAL PANEL (SEE ELECTRICAL)EQ EQUALEQUIP EQUIPMENTEST ESTIMATE(D)EXH EXHAUSTEXIST EXISTINGEXT EXTERIOR

F

F FILLER (VERIFY WIDTH)F# FILLER, (NUMBER) INCH WIDEFB FIRE BLANKET (SEE DIV 10 SECTION)FD FLOOR DRAIN (SEE PLUMBING)FE FIRE EXTINGUISHER/BRACKET (SEE DIV 10 SECTION)FEC FIRE EXTINGUISHER CABINET (SEE DIV 10 SECTION)FH FUME HOODFLAM FLAMMABLEFLR FLOORFRZ FREEZERFT FOOT/FEETFUT FUTURE

G

GA GAUGEGALV GALVANIZEDGL GLASSGT GROUTGYP BD GYPSUM BOARD

H

H HIGH/HEIGHTHAZ HAZARD(OUS)HB HOSE BIBB (SEE PLUMBING)HDW HARDWAREHORIZ HORIZONTALHT HEIGHTHVY HEAVY

IID INSIDE DIAMETERIN INCH(ES)INC INCUBATORINSUL INSULATIONINT INTERIORISO ISOLATION

J

JT JOINT

K

KS KNEE SPACE

L

L-_ ANGLE-(SIZE)L LENGTHLAB LABORATORYLAM LAMINATELBS POUNDSLIQ LIQUIDLKR LOCKER (SEE DIV 10 SECTION)LLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLN LIQUID NITROGENLT LIGHT

M

N

N NORTHNA NOT APPLICABLENEG NEGATIVENIC NOT IN CONTRACTNO NUMBERNOM NOMINALNTS NOT TO SCALE

O

OC ON CENTEROD OUTSIDE DIAMETEROFCI OWNER FURNISHED, CONTRACTOR INSTALLEDOFOI OWNER FURNISHED, OWNER INSTALLEDOH OVERHEADOPH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOSC OVERHEAD SERVICE CARRIER

PPE POLYETHYLENEPHEN PHENOLICPLAM PLASTIC LAMINATEPLBG PLUMBINGPLYWD PLYWOODPNL PANELPOS POSITIVEPP POLYPROPYLENEPROJ SCRN PROJECTION SCREEN (SEE DIV 11 SECTION)PTD PAPER TOWEL DISPENSER (SEE DIV 10 SECTION)PTN PARTITION

R

R=_ RADIUS (DIMENSION)RAD RADIUSRCP REFLECTED CEILING PLAN (SEE ARCHITECTURAL)RE REFER TOREC RECESSEDREF REFRIGERATORREQ REQUIRE(D)REQ'S REQUIREMENTSREV REVISIONRH RELATIVE HUMIDITYRM ROOM

S

S SOUTHSBSTR SUBSTRATESCF SLOTTED CHANNEL FRAMING (SEE DIV 05 SECTION)SD SOAP DISPENSER (SEE DIV 10 SECTION)SHR SHOWERSHT SHEETSHV SHELF/SHELVINGSIM SIMILARSK SINKSP SPACE(S)SQ SQUARESPEC SPECIFICATIONSS SAFETY STATION (SEE PLUMBING)SSM SOLID SURFACE MATERIALSST STAINLESS STEELSTD STANDARDSTL STEELSTOR STORAGESTRUCT STRUCTURE/STRUCTURAL

T

U

UC UNDER-COUNTER, UNDER CABINETUCL UNDER-CABINET LIGHTUNO UNLESS NOTED OTHERWISEUPS UNINTERRUPTIBLE POWER SUPPLYUTIL UTILITY

VVAR VARIESVAV VARIABLE AIR VOLUMEVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVOL VOLUME

W

W WESTW WIDE/WIDTHW/ WITHW/O WITHOUTWD WOODWT WEIGHTWW WIREWAY (SEE ELECTRICAL)

QQTY QUANTITY

LABORATORY ABBREVIATIONS

C-_ CHANNEL-(SIZE)CAB CABINET(S)CAV CONSTANT AIR VOLUMECFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLEDCFOI CONTRACTOR FURNISHED, OWNER INSTALLEDCH CANOPY HOODCHEM CHEMICALCL CENTER LINECLG CEILINGCLOS CLOSURECLR CLEARCOL COLUMNCOMP COMPUTERCONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACT(OR)CS CUP SINKCSWK CASEWORKCTR COUNTERCTRL CONTROL(LED)CYL CYLINDER

MATL MATERIALMAX MAXIMUMMECH MECHANICALMFR MANUFACTURERMIN MINIMUMMKR BD MARKER BOARD (SEE DIV 10 SECTION)MTD MOUNTEDMTG MOUNTINGMTL METAL

T

& AND@ ATACC ACCESSIBLEADJ ADJUSTABLE, ADJACENTAFF ABOVE FINISHED FLOORAHJ AUTHORITY HAVING JURUISDICTIONALT ALTERNATEALUM ALUMINUMARCH ARCHITECT/ARCHITECTURALAW ARCHITECTURAL WOODWORK (SEE ARCH)

T THICK(NESS)TEMP TEMPERATURETHK THICK(NESS)THRU THROUGHTK BD TACK BOARD (SEE DIV 10 SECTION)TO_ TOP OFTR TROUGHTS-# TUBE STEEL-(SIZE)TYP TYPICAL

REFERENCE SYMBOLS LEGEND

N

NORTH ARROW

ENLARGED PLAN, DETAIL

SECTION/ELEVATION

ELEVATION, INTERIOR ELEVATION(S)

KEYED NOTE

REVISION TAG

SHT

# SHT

1

2

3

4

SHT

#

SHT#

1

X

WORK POINT

#'-#"SPOT ELEVATION

LINE TYPE LEGEND

CONTINUOUS - LAB FURNISHINGS & EQUIPMENT, EXCEPT AS INDICATED BELOW

DASH - HIDDEN ITEMS (ABOVE OR BELOW)

SMALL DASH - OWNER-FURNISHED EQUIPMENT / PRODUCT

SCREENED - EXISTING, NOT IN CONTRACT, OR BY OTHERS

COLUMN LINE

MATCH LINE

SCREENED DASH - HIDDEN ITEMS (ABOVE OR BELOW) EXISTING, NOT IN CONTRACT, OR BY OTHERS

LOOSE DASH - EXISTING TO BE REMOVED

CENTER LINE

BREAK LINE - MATERIAL CONTINUES

MATCH LINE

LABORATORY PLAN SYMBOLS LEGEND

LAB CASEWORK

COUNTERTOP MATERIAL AND HEIGHT TAG:

H/C

LS-##

EXHAUST CONNECTION

(SEE MECHANICAL)

LOCAL EXHAUST VENT

(SNORKEL)MOUNTING POINT

ARM

HEAD

CANOPY EXHAUST, ABOVE

(SEE MECHANICAL)

FUME HOOD

BIOLOGICAL

SAFETY CABINET

LAB EQUIPMENT (CFCI)

OWNER FURNISHED

EQUIPMENT / PRODUCT

FH-#X

BSC-#X####

####

EQUIP NAME

ACCESSORY TAG:XX-##

E36"

BSC TAG

BSC SERVICE

CUP SINKWHERE INDICATED

FUME HOOD TAG

FUME HOOD SERVICE ORDER (E @ BOTTOM)

LAB EQUIPMENT TAG

EQUIPMENT TAG(WHEN SCHEDULED)

GENERIC LABEL(UNLESS SCHEDULED)

UMBILICAL

PEGBOARD

LAB SINK

DRAIN GROOVES/BOARD WHERE INDICATED

LAB SINK TAG

DECK MOUNTED SERVICE FITTINGS

COUNTERTOP AND SPLASH

ABOVE/BELOW COUNTER ITEM

CASEWORK MOUNTED SERVICE FITTING (KS, IN-CABINET, APRON/PANEL AS NOTED)

E

WALL MOUNTED SERVICE FITTING, MOUNTING HEIGHT

A@

48"

XXXE

XXXE

LA = LAB ACCESSORYLE = LOCAL EXHAUST VENTLS = LAB SINKLT = LAB TABLEMC = MOBILE CARTPB = PEGBOARDUM = UMBILICAL(AND AS SCHEDULED)

(SEE GENERAL NOTES FORTYPICAL MATERIAL AND HEIGHT)

MATERIALS: HEIGHTS:E = EPOXY ADJM = SOLID SURFACE MATERIAL 24"

30" 36"

SAFETY STATION

CLEAR FLOOR SPACE 30"x60" MIN.TYPE VARIES (SEE PLUMBING)

ADJOINING CONSTRUCTION

CLEAR FLOOR SPACE

TYPE DESCRIPTIONSS-##

C1 - COMBINATION SAFETYSHOWER / EYEWASH, RECESSED

D1 - COMBINATION SAFETY SHOWER / EYEWASH, SURFACE

A

XX

WATERCW COLD WATER

HW HOT WATERH/C HOT & COLD WATER

PCWR PROCESS CHILLED WATER RETURN

PURIFIED WATER

DI DEIONIZED WATERDW DISTILLED WATER

PW PURE WATERRO REVERSE OSMOSIS WATER

SPECIAL GAS

CA COMPRESSED AIR (LAB)

ZA ZERO AIR

AR ARGON

CO2 CARBON DIOXIDE

H HYDROGENHE HELIUM

N NITROGENO2 OXYGENSG- SPECIAL GAS-(CHEMICAL SYMBOL)

OTHER PIPED SERVICESV VACUUM

ELECTRICAL AND DATA

D DATAE ELECTRICAL

LABORATORY SERVICE FITTING ABBREVIATIONS

SAFETYDH DRENCH HOSEEW EYE WASH

PCWS PROCESS CHILLED WATER SUPPLYPR PRE-RINSE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:40

PM

QL001

ABBREVIATIONS,LEGENDS ANDNOTES

JHL

19-0056.001

CJH

LABORATORY DRAWING LIST

QL001 ABBREVIATIONS, LEGENDS AND NOTES

QL010 SCHEDULES

QL030 LAB CASEWORK TYPES, LEGENDS AND NOTES

QL060 LABORATORY EQUIPMENT MATRIX

QL061 LABORATORY EQUIPMENT MATRIX

QL062 LABORATORY EQUIPMENT MATRIX

QL101 OVERALL LAB PLAN

QL111 BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PROVERMEZZANINE

QL120 BUILDING #663 - ENLARGED LAB CASEWORK PLAN & ELEVATIONS -METROLOGY

QL121 BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - METROLOGY

QL130 BUILDING #663 - ENLARGED LAB CASEWORK PLAN & ELEVATIONS -PETROLEUM AND SEED

QL131 BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PETROLEUM ANDSEED

QL140 BUILDING #643 - ENLARGED LAB CASEWORK PLAN & ELEVATIONS -CHEMISTRY

QL141 BUILDING #643 - ENLARGED LAB ELEVATIONS - CHEMISTRY

QL142 BUILDING #643 - ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY

QL901 TYPICAL LABORATORY CASEWORK

QL902 LABORATORY TABLE AND MOBILE CART DETAILS

QL903 LABORATORY DETAILS - ACCESSORIES

QL904 LABORATORY DETAILS - ACCESSORIES

QL905 LABORATORY DETAILS - ACCESSORIES

QL906 LABORATORY DETAILS - SERVICES AND FUME HOOD SECTIONS

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

LABORATORY FURNISHINGS AND EQUIPMENT GENERAL NOTES

A. DO NOT SCALE DRAWINGS, USE DIMENSIONS. DIMENSIONS NOTED "ASREQUIRED," "VERIFY," "VERIFY IN FIELD," "MATCH EXISTING" OR OTHERSIMILAR TERMS ARE TO BE VERIFIED BY THE CONTRACTOR. NOTIFYARCHITECT OF DISCREPANCIES AND OBTAIN CLARIFICATION BEFOREPROCEEDING.

B. CONDITIONS SHOWN ARE APPROXIMATE BASED ON INFORMATIONFURNISHED. NOTIFY ARCHITECT OF DISCREPANCIES AND OBTAINCLARIFICATION BEFORE PROCEEDING.

C. LAB CASEWORK SHALL BE METAL CASEWORK, UNO.

D. LAB COUNTERTOPS SHALL BE 1” EPOXY, UNO.

E. LAB COUNTERTOP HEIGHT SHALL BE 36”, UNO.

F. REFER TO SHEET QL-030 FOR OTHER LAB CASEWORK GENERAL NOTES.

G. LOCATE LOCAL EXHAUST DEVICES AT CENTER OF ACOUSTICAL CEILINGPANEL, UNO. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS.]

I. REFER TO LABORATORY EQUIPMENT LIST FOR LAB EQUIPMENT REFERENCEINFORMATION

TABLE SCHEDULE GENERAL NOTES:

A WORK SURFACE SHALL OVERHANG TABLE FRAME MINIMUM 1" EACH SIDE, UNO.B FOR TABLES WITH HEIGHT ADJUSTABLE LEGS, "H" INDICATES WORKSURFACE SET-UP HEIGHT: 36" UNLESS OTHERWISE DIRECTED BY OWNER. C PROVIDE HEIGHT ADJUSTABLE LEVELING DEVICES AT EACH TABLE LEG, UNO.

TABLE FRAME TYPE LEGEND

TYPE-A STANDARD METAL TABLE FRAMETYPE-B HEAVY-DUTY METAL TABLE FRAME

TABLE SCHEDULE KEYED NOTES:

1 NOT USED2 NOT USED3 4" DIA. SWIVEL/LOCKING CASTERS.4 COMBINATION LEVELING CASTERS.5 3" OVERHANG FRONT AND BACK OF TABLE TO ALLOW FOR APPARATUS CLAMPING.

/1 QL902

/2 QL902

/2 QL902

/2 QL902

/1 QL902

/1 QL902

/1 QL902

/1 QL902

LAB SINK SCHEDULE GENERAL NOTES:

A REFER TO DETAIL FOR TYPICAL SINK SERVICE FITTING MOUNTING CONDITIONS.B EPOXY SINKS, PROVIDE WITH CORNER DRAIN.

LAB SINK SCHEDULE KEYED NOTES:

1 DROP-IN (FLUSH MOUNT) AT COUNTERTOPS.

/1 QL906

FUME HOOD SCHEDULE GENERAL NOTES:

A REFER TO LAB PLAN TAG FOR UNIT WIDTH (#=FEET).B FUME HOOD DEPTH NOMINAL 36", UNO.C SEE MECHANICAL FOR EXHAUST CONNECTION, INCLUDING DUCT.D SEE PLUMBING AND ELECTRICAL FOR UTILITY SERVICES.E FUME HOOD WORK SURFACE SHALL BE 1-1/4" THICK EPOXY RESIN W/ RAISED (MARINE) EDGE, UNO.

/6 QL906

/6 QL906

/6 QL906

/7 QL906

/6 QL906

MOBILE CART SCHEDULE GENERAL NOTES:

A ADJUSTABLE HEIGHT WORK SURFACE TYPICAL. SET-UP HEIGHT AS SCHEDULED.

MOBILE CART SCHEDULE KEYED NOTES:

1 COMBINATION LEVELING CASTERS

MOBILE CART FRAME TYPE LEGEND

TYPE-A STANDARD DUTY CART

/3 QL902

/3 QL902

/3 QL902

A

A

A

/1 QL903

/2 QL903

/3 QL903

/4 QL903

/11 QL903

/10 QL903

/5 QL903

/7 QL903

/8 QL903

/1 QL904

- - -

12 (MOD) 12 (MOD) 30

43 18 65

- - -

26 19 79

- - -

- - -

- - -

- - -

24 - 36

14 14 -

30 (MOD) 30 (MOD) 40

8 8 -

/2 QL90526 8 -

2 / QL904

/1 QL905

- - -

/6 QL903

/9 QL903

81.75 29 35

/3 QL904

/1 QL901-

-

-

-

-

LABORATORY SERVICE FITTING SCHEDULE

TAG DESCRIPTIONS BASIS-OF-DESIGN PRODUCT - NOTES

WATERSAVER STANDARD

SERVICE TYPE MODEL NO. (UNO)

TAG FITTING

V V51

CA CA51

CW CW51

E 120V DUPLEX, GFIC

LABORATORY GAS NEEDLE VALVE FITTINGS (150 PSI MAX. WORKING PRESSURE)

CA, V 1SINGLE NEEDLE VALVE, WALL MOUNTED W/ THREADED ESCUTCHEON, AND REMOVABLE SERRATED HOSE END

L4880FT-325

CA, V 2SINGLE NEEDLE VALVE, DECK MOUNTED W/ TURRET BASE, MOUNTING SHANK AND REMOVABLE SERRATED HOSE END

L2880-131WSA

A REFER TO 1/QL-904 FOR DEVICE LOCATION CRITERIA AND TYPICAL DECK MOUNTING DETAILS.

B WALL MOUNTED LAB GAS SERVICE FITTINGS AT 48" AFF, UNO. REFER TO 2/QL-904 FOR TYPICAL WALL MOUNTING DETAILS

C SERVICE FITTING PLAN TAGS AT FUME HOODS REFER TO THE FOLLOWING SERVICE FITTING TYPES, UNO.

CW 51

REMOTE CONTROL WATER VALVE, PANEL MOUNTED (FRONT ACCESS); PANEL MOUNTED RIGID/SWING GOOSENECK WITH VACUUM BREAKER, MOUNTING SHANK, AND REMOVABLE SERRATED HOSE END

L740W-9RSVB

COORDINATE FITTING TYPE/MODEL NO. WITH FUME

HOOD CONSTRUCTION (STRAIGHT OR ANGLE FACE).

E ---120V DUPLEX RECEPTACLE, GFCI; STAINLESS STEEL FACE PLATE

--- PER FUME HOOD MFR.

SCHEDULE GENERAL NOTES

EW 1EYE WASH, DECK MOUNTED, SWING-DOWN ACTION (AUTO-FLOW)

EW849LH-R

BACK-LEFT LOCATION. EYE-CUPS SHALL BE W/IN SINK OPENING WHEN ACTIVATED, CLEAR OF OTHER FIXTURES. REFER TO PLUMBING FOR TEMPERED

WATER MIXING VALVE.

SS C1

SAFETY STATION TYPE-C1, RECESSED COMBINATION BARRIER-FREE SWING-DOWN EYE/FACE WASH W/ DRAIN PAN AND EMERGENCY SHOWER W/ WALL MOUNTED SHOWER HEAD

SSBF2170REFER TO PLUMBING FOR

TEMPERED WATER MIXING VALVE AND ALARM (IF ANY)

SS D

SAFETY STATION TYPE-D, SURFACE MOUNTED COMBINATION BARRIER-FREE SWING-DOWN EYE/FACE WASH W/ DRAIN PAN DISCHARGE TO FLOOR, AND EXPOSED EMERGENCY SHOWER HEAD

SSBF2173REFER TO PLUMBING FOR

TEMPERED WATER MIXING VALVE AND ALARM (IF ANY)

ELECTRICAL AND DATA SERVICE FITTINGS

D --- VOICE/DATA DEVICE; STAINLESS STEEL FACE PLATE ---SEE ELEC/COMM FOR TYPE OF

DATA DEVICE

E ---120V DUPLEX RECEPTACLE; STAINLESS STEEL FACE PLATE

---SEE ELEC FOR TYPE OF

RECEPTACLE DEVICE

FUME HOOD REMOTE CONTROL AND ELECTRICAL SERVICE FITTINGS

CA, N, V 51

REMOTE CONTROL NEEDLE VALVE, PANEL MOUNT (FRONT ACCESS); PANEL MOUNTED 45-DEG REMOVABLE SERRATED HOSE END AND MOUNTING SHANK

L740N-LR

COORDINATE FITTING TYPE/MODEL NO. WITH FUME

HOOD CONSTRUCTION (STRAIGHT OR ANGLE FACE).

LABORATORY WATER SERVICE FITTINGS

HC 1WATER MIXING FAUCET, DECK MOUNTED, 12"H X 6" RIGID/SWING GOOSENECK W/ VACUUM BREAKER AND REMOVABLE AREATOR

L414VB-55FURNISH REMOVABLE SERRATED

HOSE END.

CW 2SINGLE WATER FAUCET, DECK MOUNTED, 12" H X 6" RIGID GOOSENECK, W/ VACUUM BREAKER, REMOVABLE SERRATED HOSE END

L611VBLAB SINK - RIGHT CONTROL;

FURNISH REMOVABLE AERATOR

LABORATORY SAFETY FITTINGS

N N51

EW 2EYE WASH, DECK MOUNTED, SWING-DOWN ACTION (AUTO-FLOW)

EW849L

BACK-RIGHT LOCATION. EYE-CUPS SHALL BE W/IN SINK OPENING WHEN ACTIVATED, CLEAR OF OTHER FIXTURES. REFER TO PLUMBING FOR TEMPERED

WATER MIXING VALVE.

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:41

PM

QL010

SCHEDULES

JHL

19-0056.001

CJH

LABORATORY SINK SCHEDULE

TAGSINK TYPE

(COMPARTMENT)

NOMINAL COMPARTMENT SIZE (INCHES)

MATERIAL MOUNTING NOTESW D H

LS-01 SINGLE 25 15 10 EPOXY DROP-IN NOTE 1

LS-02 SINGLE 18 15 10 EPOXY DROP-IN NOTE 1

LABORATORY ACCESSORIES SCHEDULE

TAGSPECIFICATION

SECTION DESCRIPTION

BASIS OF DESIGN NOMINAL UNIT SIZE (INCHES)

COMMENTS DETAIL REF.MANUFACTURER MODEL NUMBER WIDTH DEPTH HEIGHT

LA-A 12 4053 GAS CYLINDER BRACKET SAFE-T-RACKSYSTEMS, INC.

SAFE-T-RACK BLOCK MODEL CB-1C(HIGH), AND MODEL CB-1 (LOW)

LA-B1 12 4053 GAS CYLINDER RACK SAFE-T-RACKSYSTEMS, INC.

SAFE-T-RACK CYLINDER RACK 12" X 12" CYLINDER MODULES. VERIFY CYLINDER SIZE WITHOWNER. CYLINDER RACKS MUST BE ABLE TO FIT UNDERCOUNTER

LA-B2 12 4053 GAS CYLINDER RACK TYPE-C (DEWER ANDTRANSPORTER)

SAFE-T-RACKSYSTEMS, INC.

1800 SERIES DEWER RACK 30" X 30" CYLINDER MODULES. VERIFY DEWER / LIQUIDCYLINDER SIZE WITH OWNER.

LA-F 12 4053 FLAMMABLE STORAGE CABINET JUSTRITE SURE-GRIP EX YELLOW SAFETYCABINET, MODEL 894520

45 GAL CAPACITY; 2-DOOR SELF-CLOSING

LA-P 12 4053 PASS THRU CHAMBER SEE SPECIFICATIONS - CHAMBER: 36" WIDE x 42" DEEP x 48" HIGH

LA-S 12 4053 GAS CYLINDER CABINET MATHESON 1178F HOLDS TWO CYLINDERS

LE-A1 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH

LE-A2 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH

LE-A3 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH

LE-A4 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH

LE-A5 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH

PB-A 12 3553 PEG BOARD - TYPE A - STAINLESS STEEL LAB CASEWORK MFR W/ REMOVABLE CLEAR ACRYLIC PEGS; DRIP TRAY, DRAINOUTLET AND DRAIN HOSE

SG-A 12 3553 SPASH GUARD - TYPE A - STAINLESS STEEL LAB CASEWORK MFR SPASH GUARD AROUND 5 GAL TEST POUR AREA; VERIFY SIZEIN FIELD

UM-A 12 3553 UMBILICAL CHASE - TYPE A LAB CASEWORK MFR FLOOR MOUNTED

UM-B 12 3553 UMBILICAL CHASE - TYPE B LAB CASEWORK MFR BENCH MOUNTED

UM-C 12 3553 UMBILICAL CHASE - TYPE C LAB CASEWORK MFR FLOOR MOUNTED

LABORATORY TABLE SCHEDULE

TAG

WORK SURFACE (INCHES) HEIGHTADJUSTABLE

OR FIXED

TABLEFRAME

MATERIAL

WORKSURFACEMATERIAL

TABLEFRAMETYPE DETAIL NOTESW D H

LT-01 24 30 24 FIXED METAL EPOXY A

LT-02 48 30 24 FIXED METAL EPOXY A

LT-03 48 30 36 ADJ METAL EPOXY A NOTE 4

LT-04 60 30 36 ADJ METAL EPOXY A NOTE 4

LT-05 72 30 36 ADJ METAL EPOXY A NOTE 3, NOTE 5

LT-06 60 30 36 ADJ METAL EPOXY B NOTE 3, NOTE 5

LT-07 48 30 36 ADJ METAL EPOXY B NOTE 4

LT-08 60 30 36 ADJ METAL EPOXY B NOTE 4

LABORATORY FUME HOOD SCHEDULE

TAG TYPE VENTILATION SASH TYPE

WORKSURFACEMATERIAL

WORKSURFACEHEIGHT

(INCHES) DETAILON / OFFSWITCH LINER TYPE

FH-4A GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 36 NO - ON 24/7 FRP - FIBERGLASS REINFORCED POLYESTER

FH-4B GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 36 YES - ON/OFF FRP - FIBERGLASS REINFORCED POLYESTER

FH-4C GENERAL PURPOSE, BENCH TYPE CAV VERTICAL EPOXY 36 NO - ON 24/7 FRP - FIBERGLASS REINFORCED POLYESTER

FH-4D GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 30 YES - ON/OFF FRP - FIBERGLASS REINFORCED POLYESTER

FH-6A GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 36 NO - ON 24/7 FRP - FIBERGLASS REINFORCED POLYESTER

LABORATORY MOBILE CART SCHEDULE

TAG

WORK SURFACE (INCHES) CARTFRAME

MATERIAL

WORKSURFACEMATERIAL

CART FRAMETYPE DETAIL NOTESW D H

MC-01 48 30 36 METAL EPOXY NOTE 1

MC-02 60 30 36 METAL EPOXY NOTE 1

MC-03 72 30 36 METAL EPOXY NOTE 1

Axx06/07 OPH Axx08

Bxx06/Bxx07 OPH Bxx08Bxx04

CASEWORK TYPE

WIDTH INCHES

DRAWER/DOORCONFIGURATION

B 36 01

CASEWORK LEGEND

Q

Bxx02/Bxx03 OPH

13"D - Txx02/Txx03 OPH16"D - Txx12/Txx13 OPH22"D - Txx22/Txx23 OPH

13"D - Txx0416"D - Txx1422"D - Txx24

13"D - Txx06/Txx07 OPH16"D - Txx16/Txx17 OPH22"D - Txx26/Txx27 OPH

13"D - Txx0816"D - Txx1822"D - Txx28

Bxx31

K

J

F

B

A

W

Fxx08FLAMMABLE

Fxx06/Fxx07 OPHFLAMMABLE

FLUSHPANEL

ADJSHELVES

FLUSHPANEL

BACK PANEL OR PTN, TYP.

30" - 48" 30" - 48"

ADJSHELVES

FRAMEDGLASS DOOR

90

" U

NO

SECTIONCT

R H

ADJ SHELVES

CASEWORK TYPES

TAG DESCRIPTION TYPICAL DETAILS

A CORROSIVES STORAGE CABINET (ACIDS, BASES)

B STANDING HEIGHT BASE CABINET - 36"

C NOT USED

D NOT USED

E NOT USED

F FLAMMABLE / HAZARDOUS STORAGE CABINET

G NOT USED

H NOT USED

I NOT USED

J ADJUSTABLE SHELVING SYSTEMS

K KNEE SPACES

L SITTING HEIGHT BASE CABINET - 30"

M NOT USED

N NOT USED

O NOT USED

P PANEL SEE ILLUSTRATION ON THIS SHEET

Q EQUIPMENT SPACE

R NOT USED

S SINK BASE CABINET

T TALL CABINET

U NOT USED

V VACUUM PUMP CABINET

W WALL CABINET

X NOT USED

Y NOT USED

Z NOT USED

HORIZ RAIL

(TOP AND BOTTOM)

VERT RAIL

ADJ SHELVES

12" D - Jxx5218" D - Jxx62

WALL RAIL - 2 SHELVES

12" D - Jxx5318" D - Jxx63

WALL RAIL - 3 SHELVES

12" D - Jxx73ISLAND BENCHTOP

UPRIGHTS -3 SHELVES

13"D-Wxx56/Wxx57 OPH16"D-Wxx66/Wxx67 OPH

13"D-Wxx5816"D-Wxx68

FRAMEDGL. DR.FRAMEDGL. DR.

15" - 24" 30" - 48"

ADJSHELF

Fxx02/03 OPHFLAMMABLE

Fxx04FLAMMABLE

24"- 72" 24"- 72"

CT

R T

OP

30

",3

4",

36

"

18", 24" 30", 36", 48" 18"- 24" 30", 36", 48"

CT

R T

OP

36"

30" - 48" 30" - 48"

30", 36", 48"

15" - 24"

15" - 24"

S

18", 24" 18", 24"

CT

R T

OP

36"

49"

CT

R T

OP

36"

18", 24"

24"- 72"

CT

R T

OP

36"

15" - 24"

B

12" 12" 12"

ELEV

Bxx32

30" - 48"

/3 QL901

/2 QL901

/9 QL901

/7 QL901/5 QL901

/2 QL901

/4 QL901

/11 QL901

/8 QL901

/2 QL901

ADJ SHELVES

ADJOINING CONSTRUCTION, VARIES

Kxx11 - BACK PANELKxx12 - OPEN TO PARTITION

2" APRON RAIL

24" - 72"

T

VCT

R T

OP

36"

Vxx08

FLUSHPANEL

SWITCH

LOUVERS

30" - 48"

Qxx01 - OPEN TO UTILITY CHASEQxx02 - UTILITY CHASE CLOSURE

PNLS @ R & L OF EQPT SPACE

CTR TOP

OPEN TO PTN BEYOND

ADJACENT CASEWORK

30

", 3

4",

36

"C

TR

TO

P

36" MAX

30" - 48"

Sxx08

FLUSH PANEL

CT

R T

OP

36"

P

1 1/2"

CT

R T

OP

36"

4' - 10"

P4ISLAND BENCH END PANEL

84"

Lxx09

LLxx31

ADJSHELF

30" - 48" 15" - 24"

CT

R T

OP

30"

30" - 48"

Sxx48

CT

R T

OP

30"

FLUSH PANEL

Vxx28

30" - 48"

CT

R T

OP

30"

FLUSHPANEL

SWITCH

LOUVERS

/10 QL901

&

84" SOLID

DOOR

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:42

PM

QL030

LAB CASEWORKTYPES, LEGENDSAND NOTES

JHL

19-0056.001

CJH

CASEWORK GENERAL NOTES

A NOT ALL CASEWORK TYPES ARE USED. REFER TO LABDRAWINGS.

B LAB CASEWORK SHALL BE MODULAR, IN 3" INCREMENTS FORUNITS UP TO 30" WIDE; 6" INCREMENTS FOR UNITS 30" TO 48"WIDE.

C LAB CASEWORK BELOW FUME HOODS SHALL BE METAL LABCASEWORK, UNO.

D OVERALL COUNTERTOP LENGTH IS DETERMINED BY WIDTHOF CABINETS, FILLERS, OVERANGS, AND/OR DIMENSIONSINDICATED. OVERALL DIMENSIONS SHALL GOVERNREGARDLESS OF MANUFACTURER'S STANDARD DIMENSIONS.

E COUNTERTOPS SHALL OVERHANG BASE CABINETS 1"NOMINAL AT FRONT AND EXPOSED ENDS OF CABINETS, UNO.FRONT OVERHANG IS TO FACE OF CABINET DOORREGARDLESS OF CABINET STYLE. WHEN OVERALLDIMENSIONS ARE INDICATED, THE OVERHANG IS INCLUDED.

F AT WALL-TO-WALL CONDITIONS WITH OPEN KNEE-SPACEDIMENSION (K - - ##), DIMENSION SHALL BE DETERMINED INTHE FIELD. WHERE MORE THAN ONE OPEN KNEE-SPACEDIMENSION OCCURS, THE SPACE AVAILABLE SHALL BEEVENLY DISTRIBUTED.

G PROVIDE FILLERS TO CLOSE SPACE BETWEEN CABINETS,FUME HOODS, AND ADJOINING CONSTRUCTION. ATWALL-TO-WALL CONDITIONS, VERIFY FILLER SPACE IN FIELD;SPACE SHALL BE EVENLY DISTRIBUTED. PROVIDE NOMINAL 2"WIDE FILLER AT PERPENDICULAR WALL CONDITIONS, UNO.PROVIDE 1" WIDE FILLER BETWEEN TALL CABINETS AND THEADJOINING BASE/UPPER/WALL CABINET.

H COUNTERTOP HEIGHT IS NOMINAL, BASED ON LABCASEWORK MANUFACTURER'S CABINET MODULE HEIGHTAND COUNTERTOP MATERIAL (W/IN 3/4" OF REFERENCEDHEIGHT). WHERE 34" HEIGHT IS INDICATED, COUNTERTOPHEIGHT SHALL NOT EXCEED 34" AFF. AT KNEE-SPACES WITHAPRONS, CLEAR HEIGHT SHALL NOT BE LESS THAN 27".

I MAINTAIN OVERALL NOMINAL HEIGHT OF COUNTERTOPS.BEGIN CASEWORK INSTALLATION AT HIGH POINT OF FLOORAT EACH BENCH WITH CABINET LEVELERS SCREWED IN ASFAR AS POSSIBLE.

J COUNTERTOP DEPTH AT WALL CONDITIONS SHALL BE 30",INCLUDING OVERHANG, UNO. COUNTERTOP DEPTH ATISLAND/PENINSULA CONDITIONS SHALL BE 60", INCLUDINGOVERHANGS, UNO.

K FINISH EXPOSED-TO-VIEW COUNTERTOP EDGES, BACKS ANDENDS OF CURBS/SPLASHES.

L PROVIDE SEALANT AT JOINT BETWEEN BUILDINGCONSTRUCTION, AND COUNTERTOPS / CURBS / SPLASHES.

M CASEWORK TYPE-A, CORROSIVES CABINETS (ACIDS ANDBASES): METAL LAB CASEWORK, UNO. ACID STORAGETYPICAL, UNO. REFER TO DRAWING NOTES FOR STORAGECONTENTS OTHER THAN ACIDS, AND FOR DEDICATEDSTORAGE.

N CASEWORK TYPE-F, FLAMMABLE / HAZARDOUS MATERIALCABINETS: METAL LAB CASEWORK, UNO. REFER TO DRAWINGNOTES FOR STORAGE CONTENTS OTHER THAN FLAMMABLELIQUIDS, AND FOR DEDICATED STORAGE.

O NOT USED

P CASEWORK TYPE-J, ADJUSTABLE SHELVING SYSTEM:ADJUSTABLE SHELVES FOR WALL RAIL AND BENCHTOPUPRIGHT SHELVING UNITS SHALL BE METAL SHELVES ANDSHELF EDGE RETAINING RODS, UNO.

Q NOT USED

R CASEWORK TYPE-Q, EQUIPMENT SPACE: WIDTH INDICATED ISNOMINAL, VERIFY REQUIRED WIDTH WITH EQUIPMENTMANUFACTURE. WHERE EQUIPMENT HEIGHT RESULTS INCLEAR SPACE BETWEEN COUNTERTOP AND TOP OFEQUIPMENT GREATER THAN 3/4", PROVIDE FILLER/APRON TOMATCH ADJOINING CASEWORK. REFER TO MECHANIAL,PLUMBING AND ELECTRICAL DRAWINGS FOR UTILITYSERVICES.

S CASEWORK TYPE-T, TALL CABINETS: CASEWORK TYPEELEVATIONS ILLUSTRATE FRAMED GLASS DOORS WITHHORIZONTAL MULLION. DOORS W/OUT HORIZONTAL MULLIONARE ACCEPTABLE.

T CASEWORK TYPE-V, VACUUM PUMP CABINETS: INSULATEDCABINET WITHOUT CABINET BOTTOM. CABINETS TO BEEXHAUSTED; SEE MECHANICAL DRAWINGS FOR EXHAUSTCONNECTION INCLUDING DUCT. PROVIDE DOOR LOUVERS,TOE-KICK VENTS, OR UNDER-CUT DOOR FOR THRU-CABINETVENTILATION. PROVIDE CABINET WITH MOBILE PLATFORM,UNO; SIZE TO FIT CABINET.

1 Date 1 Revision 1

PE048 U444680 Vapor Pressure 3 Grabner VP-Xpert OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 200 - - - - - - - - - - - - - - - - - -

PE049 Sulfur Computer OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE050 U411693 Sulfur Instrument ANTEK 900VS OFOI 1 - Main Lab 19 25 43 65 B 1 X P 120 12 - - - - - - - - - - - - - -Oxygen,

from cylinder

- - - -

Kit Prep

PE051 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

PE052 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

PE053 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

Oil / Ant Stor

PE054 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

PE055 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

(Equipment List Continues on Next Sheet)

ME012 Roller Table OFOI 1 - Large Mass 60 12 30 - F - - - - - - - - - - - - - - - - - - - - - - - -

ME013 UPS APC 750 OFOI 1 - Large Mass 14 8 4 11 F 1 X P 110 12 - - - - - - - - - - - - - - - - - - -

ME014 U449508 Mass Comparator 7 Mettler XPE 604 OFOI 1 - Large Mass 42 36 8 200 F 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -

ME015 Grinder OFOI 1 - Large Mass 10 8 8 - B 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -

ME016 Wire Wheel OFOI 1 - Large Mass 8 8 8 - B 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -

ME017 Drill press OFOI 1 - Large Mass 18 18 48 - F 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -

ME018 Tool Chest on Wheels OFOI 1 - Large Mass 30 18 48 - F - - - - - - - - - - - - - - - - - - - - - - - -

Metrology - Vestibule

ME019 Pallet Jack, Electric 2 OFOI 1 - Large Mass 27 48 36 - F 1 X P 11030

AMP CIRC

- - - - - - - - - - - - - - - - - - -

ME020 Pallet Jack, Electric 1 OFOI 1 - Large Mass 27 48 36 - F 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -

ME021 Pallet Jack, Manual OFOI 1 - Large Mass 27 48 36 - F - - - - - - - - - - - - - - - - - - - - - - - -

Metrology - Storage

ME022 Wire Shelving Unit OFOI - 1 Large Mass 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

ME023 Wire Shelving Unit OFOI - 1 Large Mass 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

Equip. Tag User ID Equipment Description Manufacturer Model No.

Fu

rnis

h &

Insta

ll

Exis

tin

g

Pu

rch

ase

New

New

Ro

om

Wid

th (

in)

Dep

th (

in)

He

igh

t (i

n)

Weig

ht

(lb

s)

Mo

un

tin

g

Lo

cati

on

Nu

mb

er

of

Ou

tlets

Ded

icate

d

Cir

cu

its

Hard

Wir

e /

Plu

g

Vo

lt

Am

p

Watt

s

Ph

as

e

Sin

gle

UN

O

Em

erg

en

cy

UP

S

Dis

co

nn

ect

Bo

x

Data

Co

ld W

ate

r

Ho

t W

ate

r

Pu

re W

ate

r

Dra

in

Co

mp

. A

ir

Nit

rog

en

Hyd

rog

en

Heliu

m

Oth

er

Gases

Exh

au

st

Dir

ec

t

Exh

au

st

Ind

irect

Tem

p /

RH

Co

ntr

ol

BT

U /

Ho

ur

Remarks

Metrology - Prover Mezzanine

ME001 - Prover - 25 gallon - - OFOI 1 - Prover Mezzanine 24 24 48 ~ 250 F - - - - - - - - - - - X - - - - - - - - - - - -

ME002 - Prover - 50 gallon - - OFOI 1 - Prover Mezzanine 36 36 60 ~ 550 F - - - - - - - - - - - X - - - - - - - - - - - -

ME003 - Prover - 100 gallon - - OFOI 1 - Prover Mezzanine 48 48 72 ~ 1150 F - - - - - - - - - - - X - - - - - - - - - - - -

Metrology - Large Mass

ME004 U321760 Mass Comparator 8 Mettler KG 3000 OFOI 1 - Large Mass 60 84 8 500 F 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -

ME005 U321719 Mass Comparator 6 Sartorius CC50001 OFOI 1 - Large Mass 72 96 36 20 F 1 - P 110 - 50 VA - X X - - - - - -45 psi, from

cylinder- - - - - - - -

These instruments require a room to be within 40 to 60 %RH +/- 20% per 4 hr. Temp:18 °C to 27 °C Max change +/-5.0 °C per 12 hr & +/- 3.0 °C per hr. Maintained at a positive pressure of 0.05 to 0.1 inches of water.ME006 UPS APC 750 OFOI 1 - Large Mass 14 8 4 11 F 1 X P 110 12 - - - - - - - - - - - - - - - - - - -

ME007 UPS APC 750 OFOI 1 - Large Mass 14 8 4 11 F 1 X P 110 12 - - - - - - - - - - - - - - - - - - -

ME008 Balance Table OFOI 1 - Large Mass 36 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -

ME009 U444702 Mass Comparator 9 Sartorius MCM5003 OFOI 1 - Large Mass 17 20 16 10 B 1 - P 110 - 35 VA - X X - - - - - - - - - - - - - - -

ME010 U444703 Mass Comparator 10 Sartorius MSA225S OFOI 1 - Large Mass 17 20 16 10 B 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -

ME011 Shop Vac OFOI 1 - Large Mass 20 20 24 - F 1 - P 110 ~10 - - - - - - - - - - - - - - - - - - -

ME024 Wire Shelving Unit OFOI - 1 Large Mass 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

ME025 Wire Shelving Unit OFOI - 1 Large Mass 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

Metrology - Bio-Vestibule for Echelon 1 and 2

ME026 U441355 UPS Battery Backup PowerBBP-3000-PSW-ONL-LCD

OFOI 1 - Metrology BV 9 17 15 79 B 1 X P 12030

AMP CIRC

- - - - - - - - - - - - - - - - - - -

ME027 U441357 UPS Battery Backup PowerBBP-3000-PSW-ONL-LCD

OFOI 1 - Metrology BV 9 17 15 79 B 1 X P 12030

AMP CIRC

- - - - - - - - - - - - - - - - - - -

Metrology - Echelon 1 and 2

ME028 U439986 Mass Comparator 1 Sartorius MCM 106 OFOI 1 - Echelon 1 and 2 17 20 16 10 B 1 - P 110 - 35 VA - X X - - - - - - - - - - - - - - - These instruments require a room to be within 40 to 60 %RH +/- 5% per hour. Temp:18 °C to 23 °C Max change +/-0.5 °C per 12 hr & +/- 0.3 °C per hr. Maintained at a positive pressure of 0.05 to 0.1 inches of water.

ME029 U412862 Mass Comparator 2 Sartorius CCE6 OFOI 1 - Echelon 1 and 2 16 14 16 10 B 1 - P 110 - 23 VA - X X - - - - - - - - - - - - - - -

ME030 U321715 Mass Comparator 3 Sartorius CC10000S OFOI 1 - Echelon 1 and 2 22 14 20 10 B 1 - P 110 - 15 VA - X X - - - - - - - - - - - - - - -

ME031 U408108 Mass Comparator 4 Sartorius CC30002 OFOI 1 - Echelon 1 and 2 35 17 31 10 B 1 - P 110 ~2 15 VA - X X - - - - - - - - - - - - - - -

ME032 U443461 Mass Comparator 5 Sartorius MCM 1005 OFOI 1 - Echelon 1 and 2 17 20 16 10 B 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -

Seed

SE001 U421068 Seed Germinator 1 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500

SE002 U421069 Seed Germinator 2 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500

SE003 U421029 Seed Germinator 3 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500

SE004 U421030 Seed Germinator 4 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500

SE005 U321661 Seed Germinator 5 Hoffman Manf. SG3055 OFOI 1 - Seed 37 36 84 930 F 1 X 1 115 ~14 - - - - - - - - - - - - - - - - - - -

SE006 U437185 Seed Germinator and Stand Achieva ATTGPT/C OFOI 1 - Seed 20 23 41 200 F 1 1 1 115 ~14 - - - - - - - - - - - - - - - - - - -

SE007 Seed Storage Cabinet - - OFOI 1 - Seed 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

SE008 Seed Storage Cabinet - - OFOI 1 - Seed 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

Petroleum - Engine Lab

PE001 U439442 CFR Octane Engine 1 CFR F1/F2 OFOI 1 - Engine Lab 52 28 36 Isolated Pad X HW 480 and 120 3 X X X X X X 6000

PE002 U439443 CFR Octane Engine 2 CFR F1/F2 OFOI 1 - Engine Lab 52 28 36 isolated Pad X HW 480 and 120 3 X X X X X X 6000

PE003 Mixing Station OFOI 1 - Engine Lab 24 24 48 B - - - - - - - - - - - - - - - - - - - - -Canopy Hood Above

- -Connected to vaccuum pump and fuel drums

PE004Vacuum Pump for fuel into mixing station

OFOI 1 - Engine Lab 8 8 8 - B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE056 Ice Maker Manitowoc QM45A OFOI 1 - Engine Lab 20 23 37 - F 1 X P 120 5.2 - - - - - - X - - X - - - - - - - - 1750

Petroleum - Main Lab

PE005 Refrigerator / Freezer, Flammable Material Storage OFOI - 1 Main Lab 30 30 30 - F 1 X P 120 ~10 - - - - - - - - - - - - - - - - - - -

PE034 U438892 Flash point 4 PAC optiflash OFOI 1 - Main Lab 15 19 23 40 B 1 - P 110 - 1100 - - - - - - - - - - - - - - - - - -

PE035 U442506 Flash point 5 Grabner FLP-Touch OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -

PE036 U444623 Flash point 6 Grabner FLP-Touch OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -

PE037 U444624 Flash point 7 Grabner FLP-Touch OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -

PE038 U320556 Viscometer Main Unit Koehler K-23380 OFOI 1 - Main Lab 10 18 21 60 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE039 Viscometer Power Supply OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -

PE040 Viscometer Waste Receiver OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -

PE041 U439037 Viscometer Main Unit Cannon miniav-x OFOI 1 - Main Lab 10 18 21 45 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE042 Viscometer Power Supply OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -

PE043 Viscometer Waste Receiver OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -

PE044 U320498 Scale A&D company FR-300 OFOI 1 - Main Lab 8 14 15 25 B 1 - P 110 ~2 - - - - - - - - - - - - - - - - - - -

PE045 U320536 Vapor liquid ratio Grabner Minivol LVR OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 65

PE046 U320492 Vapor pressure instrument 1 Grabner MiniVAP VPS OFOI 1 - Main Lab 10 11 15 20 B 1 - P 115 - 80 - - - - - - - - - - - - - - - - - -

PE047 U435414 Vapor Pressure 2 Grabner MiniVap VPXpert OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 200 - - - - - - - - - - - - - - - - - -

PE006 U320741Refrigerator (explosion proof / Flammable Material Storage)

VWR Scientific OFOI 1 - Main Lab 29 26 65 200 F 1 X P 120 ~10 - - - - - - - - - - - - - - - - - - -

PE007 HRFF Computer OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE008 U409064 HFRR controller PCS instruments D811 OFOI 1 - Main Lab 12 16 6 60 B 1 - P 120 - 80 - - - - - - - - - - - - - - - - - -

PE009 U409065 HFRR microscope PCS instruments OFOI 1 - Main Lab 10 12 18 - B 1 - P 120 ~1 - - - - - - - - - - - - - - - - - - -

PE010 U409066 HFRR cabinet PCS instruments 0583-14 OFOI 1 - Main Lab 16 6 9 - B 1 - P 120 ~1 - - - - - - - - - - - - - - - - - - -

PE011 U320528 Centrifuge Precsion Scientific OFOI 1 - Main Lab 26 26 24 75 F 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -

PE012 U413395 GC 1 Shimadzu GC-2010 OFOI 1 - Main Lab 37 20 33 65 B 1 X P 115 - 2600 VA - - - - X - - - - X -From

cylinderFrom

cylinder- - Snorkel - -

PE013 GC Computer 1 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE014 U413396 GC 2 Shimadzu GC-2010 OFOI 1 - Main Lab 37 20 33 65 B 1 X P 115 - 2600 VA - - - - X - - - - X -From

cylinderFrom

cylinder- - Snorkel - -

PE015 GC Computer 2 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE016 U320512 Furnace VWR 1300U OFOI 1 - Main Lab 17 17 26 50 B 1 - P 120 2 - - - - - - - - - - - - - - - - - - -

PE017 U404696 Distillation unit 1 PAC AD86 5G2 OFOI 1 - Main Lab 22 29 32 150 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE018 U435415 Distillation unit 2 Grabner MiniDis ADXpert OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 200 - - - - - - - - - - - - - - - - - -

PE019 U449559 Distillation unit 3 PAC Opti Dist OFOI 1 - Main Lab 10 11 15 20 B 1 X P 120 - 1400 - - - - - - - - - - - - - - - - - -

PE020 U413473 IR 1 Thermo Nicolet 380 OFOI 1 - Main Lab 19 25 10 65 B 1 X P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE021 IR Computer 1 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE022 U434449 IR 2 Thermo Nicolet 6700 OFOI 1 - Main Lab 28 27 13 150 B 1 X P 110 ~5 110 - - - - - - - - - - - - - - - - - -

PE023 IR Computer 2 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE024 U449299 IR 3 Grabner IR Vision OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 130 - - - - - - - - - - - - - - - - - -

PE025 IR Computer 3 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE026 U409038 NIR Analytical Spectral Devices

5030 OFOI 1 - Main Lab 32 20 28 30 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE027 NIR Computer OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -

PE028 U419709 Existent Gum Bath Koehler K33780 OFOI 1 - Main Lab 27 12 16 45 B 1 X P 120 - 1500 - - - - - - - - - - - - - - - - - -

PE029 U320484 Copper Corrosion Bath Precision Scientific OFOI 1 - Main Lab 16 12 25 50 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

PE030 U320486 Cool Bath Brinkmann RMT 6 Lauda OFOI 1 - Main Lab 11 15 24 45 B 1 - P 115 - 1.2 kW - - - - - - - - - - - - - - - - - -

PE031 U320494 Flash point 1 Grabner Miniflash FLP OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -

PE032 U411694 Flash point 2 PAC HFP339 OFOI 1 - Main Lab 11 21 21 40 B 1 - P 110 - 1100 - - - - - - - - - - - - - - - - - -

PE033 U411741 Flash point 3 Grabner Miniflash FLP OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:48

PM

QL060

LABORATORYEQUIPMENTMATRIX

CJH

19-0056.001

CJH

LABORATORY EQUIPMENT MATRIX GENERAL NOTES:

A. OFOI BASIS-OF-DESIGN PRODUCTS: MANUFACTURER’S PRODUCTS NAMED IN THE LABORATORY EQUIPMENT MATRIX, INCLUDING MAKE, MODEL NUMBER OR OTHER DESCRIPTION, FORM THE BASIS-OF-DESIGN TO ESTABLISH SIGNIFICANT QUALITIES RELATED TO TYPE, FUNCTION, DIMENSION, IN-SERVICE PERFORMANCE, UTILITIES, PHYSICAL PROPERTIES, APPEARANCE AND OTHER CHARACTERISTICS. FINAL PRODUCT SELECTIONS MAY VARY.

B. EXISTING LABORATORY EQUIPMENT: INFORMATION IS BASED ON OWNER-FURNISHED INFORMATION FURNISHED IN SPRING 2020. EXISTING LABORATORY EQUIPMENT INFORMATION IS APPROXIMATE, BASED ON VISUAL OBSERVATIONS, NAME PLATES WHEN ACCESSIBLE, AND OWNER-FURNISHED EQUIPMENT DATA WHEN AVAILABLE. DIMENSIONS, ELECTRICAL, PIPED UTILITY, AND ENVIRONMENTAL CONTROL INFORMATION IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE REQUIREMENTS FOR EXISTING EQUIPMENT TO BE REUSED.

C. CONTRACTOR-FURNISHED ITEMS: REFER TO SPECIFICATION SECTIONS INDICATED FOR CONTRACTOR FURNISHED ITEMS.

D. OWNER-FURNISHED ITEMS: CONTRACTOR SHALL VERIFY PRODUCTS WITH THE OWNER. REFER TO PROJECT MANUAL DIVISION 1 SECTION “SUMMARY” FOR INFORMATION CONCERNING OWNER- FURNISHED PRODUCTS.

E. MANUFACTURER’S PRODUCT DATA INFORMATION IS FURNISHED FOR REFERENCE ONLY. MANUFACTURER’S PRODUCT INFORMATION IS SUBJECT TO CHANGE WITHOUT NOTICE.

F. IN CASE OF DISCREPANCY BETWEEN LABORATORY EQUIPMENT MATRIX INFORMATION AND MANUFACTURER’S PRODUCT INFORMATION, THE MANUFACTURER’S INFORMATION SHALL GOVERN. NOTIFY ARCHITECT OF DISCREPANCIES AND OBTAIN CLARIFICATION.

G. NEW OFOI EQUIPMENT INFORMATION LISTED ON THE MATRIX IS AN EXAMPLE ONLY; FINAL SELECTION TO BE MADE BY THE OWNER

LABORATORY EQUIPMENT MATRIX ABBREVIATIONS:

FURNISH & INSTALL CFCI - CONTRACTOR FURNISHED, CONTRACTOR INSTALLED OFOI - OWNER FURNISHED, OWNER INSTALLED

MOUNTING OPTIONS: B - BENCH F - FLOOR W - WALL C - CEILING UC - UNDERCOUNTER

OTHER ABBREVIATION: TBD - TO BE DETERMINED UNO - UNLESS NOTED OTHERWISE ~ - VALUE IS APPROXIMATE

CH060 U449300 Balance A Mettler-Toledo, LLC XSR205DU OFOI 1 - Balance Room 8 18 11 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -

CH061 U449301 Balance B Mettler-Toledo, LLC XSR205DU OFOI 1 - Balance Room 8 18 11 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -

CH062 U440150 Balance 5 Ohaus Corporation Adventurer OFOI 1 - Balance Room 9 14 14 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -

CH063 U440149 Balance 6 Ohaus Corporation AX224 OFOI 1 - Balance Room 9 14 14 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -

CH064 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH065 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH066 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH067 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -

(Equipment List Continues on Next Sheet)

Equip. Tag User ID Equipment Description Manufacturer Model No.

Fu

rnis

h &

Insta

ll

Exis

tin

g

Pu

rch

ase

New

New

Ro

om

Wid

th (

in)

Dep

th (

in)

He

igh

t (i

n)

Weig

ht

(lb

s)

Mo

un

tin

g

Lo

cati

on

Nu

mb

er

of

Ou

tlets

Ded

icate

d

Cir

cu

its

Hard

Wir

e /

Plu

g

Vo

lt

Am

p

Watt

s

Ph

as

e

Sin

gle

UN

O

Em

erg

en

cy

UP

S

Dis

co

nn

ect

Bo

x

Data

Co

ld W

ate

r

Ho

t W

ate

r

Pu

re W

ate

r

Dra

in

Co

mp

. A

ir

Nit

rog

en

Hyd

rog

en

Heliu

m

Oth

er

Gases

Exh

au

st

Dir

ec

t

Exh

au

st

Ind

irect

Tem

p /

RH

Co

ntr

ol

BT

U /

Ho

ur

Remarks

Chemistry

Chemistry Lab

CH001 Vacuum Oven Precision Scientific 31468 OFOI 1 - Chemistry Lab 13 17 18 - B 1 - P 120 5 600 - - - - - - - - - - - - - - - - - -

CH002 U439955 Furnace Barnstead Thermolyne F30428C OFOI 1 - Chemistry Lab 22 24 30 B - X HW 208 26.4 - - - - - - - - - - - - - - - - Snorkel - -

CH003 U321524 Oven (A) VWR International LLC 1370FM OFOI 1 - Chemistry Lab 32 24 34 - B 1 X P 120 13 - - - - - - - - - - - - - - - - Snorkel - -

CH004 U321560 Oven (B) VWR International LLC 1370FM OFOI 1 - Chemistry Lab 32 24 34 - B 1 X P 120 13 - - - - - - - - - - - - - - - - Snorkel - -

CH005 U450212 Microwave Digester Milestone Inc Ethos Up OFOI 1 - Chemistry Lab 40 32 27 184 B 1 X P 230 - 2680 - - - - - - - - - - - - - -35-55 CFM

- - -Exhaust tube to be clipped into fixed duct with damper

CH006 U443399 Hydrolysis System (A) ANKOM Technologies HCL OFOI 1 - Chemistry Lab 11 16 23 - in FH 1 - P 120 10 - - - - - - X - - X - - - - - - - - -

CH007 U418003 Hydrolysis System (B) ANKOM Technologies HCL OFOI 1 - Chemistry Lab 11 16 23 - in FH 1 - P 120 10 - - - - - - X - - X - - - - - - - - -

CH028 U321703 Eberbach Shaker Eberbach Corporation E5850 OFOI 1 - Chemistry Lab 12 15 12 - B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

CH029 U436963 Digital Pulse Mixer Glas Col 099A DPM12 OFOI 1 - Chemistry Lab 17 16 17 75 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

CH030 Ultrasonic Cleaner Fisher Scientific FS20 OFOI 1 - Chemistry Lab 9 8 12 11 B 1 - P 120 - 143 - - - - - - - - - - - - - - - - - -

CH031 U437360 Nitrogen Evaporator Organomation Associates 5085 OFOI 1 - Chemistry Lab 12 11 33 - in FH 1 - P 120 - 500 - - - - - - - - - -from

cylinder- - - - - - -

Clean Lab

CH032 U438671 Neogen Stat-Fax (Microwell Reader) Neogen CorporationNeogen Stat-Fax 4700

OFOI 1 - Clean Lab 10 14 5 10 B 1 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

CH033 F403677 Incubator Fisherbrand 51030518 OFOI 1 - Clean Lab 19 22 37 154 B 1 - P 120 - 87 - - - - - - - - - - - - - - - - - -

Microbiological; Fisher Scientific; Isotemp; Stainless-steel exterior; Forced air; 180L; 120V; Vendor Catalog # 51030518 Incubator, Microbiological

CH034 F403676 Autoclave, Table top Scientific KinematicaSterilElite 24 15525199

OFOI 1 - Clean Lab 22 26 17 124 B 1 X P 115 - 1800 - - - - - hand filled - - - - - - - - - - - -

CH035 F403674 Biological Safety Cabinet Thermo Scientific 1375 OFOI 1 - Clean Lab 52 32 90 499 F 1 X P 120 10 - - - - - - - - - - - - - - - - - - -

Biosafety Cabinet F403674Biological safety cabinet; Sash opening, 10 in.; HEPA filter, 99.995% at 0.3&mu: With adjustable-height stand, UV lamp; width 48 in.; Exhaust volume, 328 to 361 cfm; SS package; 120 V 50/60 Hz Vendor catalog # 1375

Grinding

CH056 Wire Shelving Unit OFOI - 1 Chem & Flam Stor 36 12 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH094 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 47 22 35 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH095 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 18 20 35 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH096 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 18 20 35 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH097 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 17 17 23 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH098 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 17 17 23 - F - - - - - - - - - - - - - - - - - - - - - - - -

Balance Room

CH057 441828 Heat Sealer A ANKOM Technologies OFOI 1 - Chemistry Lab 3 13 9 - B 1 - P 120 - 260 - - - - - - - - - - - - - - - - - -

CH058 625733 Heat Sealer B ANKOM Technologies OFOI 1 - Chemistry Lab 3 13 9 - B 1 - P 120 - 260 - - - - - - - - - - - - - - - - - -

CH059 U409290 Balance Mettler-Toledo, LLC PL-3002 OFOI 1 - Balance Room 10 15 5 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -

CH045 U430398 Refrigerator 1 / Freezer C Thermo Fisher Scientific RCRF252A14 OFOI 1 - Sample Storage 36 34 69 - F 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -Refrigerator 1/Freezer C - Thermo Fisher Scientific

CH046 U430403 Refrigerator 3 Fisher 13-986-152 OFOI 1 - Sample Storage 32 31 71 200 F 1 X P 120 12 - - - - - - - - - - - - - - - - - - - Refrigerator 3 - Fisher Scienific Isotemp

CH047 U430402Refrigerator 2 / Freezer D (explosion proof)

Thermo Scientific 3551-DB OFOI 1 - Sample Storage 24 26 60 150 F - X HW 120 1.9 - - - - - - - - - - - - - - - - - - -

Refrigerator 2/Freezer D U430402Thermoscientific freezer/refrigerator used for the storage of pesticide samples

CH048 Pesticide Storage Cabinet Justrite 894504 1 - Sample Storage 43 18 65 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH049 Freezer B Frigidaire GLFh21F8HWD OFOI 1 - Sample Storage 33 31 72 F 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -

CH050 Freezer A Frigidaire LFFN15M5HWF OFOI 1 - Sample Storage 48 30 36 161 F 1 - P 120 5 - - - - - - - - - - - - - - - - - - -

CH099Top track high density wire shelving system

See specifications See specifications CFCI - 1 Sample Storage 115 60 87 - F - - - - - - - - - - - - - - - - - - - - - - - -

Chem and Flam Stor

CH054 Wire Shelving Unit OFOI - 1 Chem & Flam Stor 36 112 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH055 Wire Shelving Unit OFOI - 1 Chem & Flam Stor 42 12 72 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH036 Shop Vac OFOI 1 - Grinding 20 20 24 - F 1 - P 110 ~10 - - - - - - - - - - - - - - - - - - -

CH037 U426134 Cutting Mill Retsch GmbH SM300 OFOI 1 - Grinding 23 28 38 353 F 1 X P 120 ~15 - - - - - - - - - - - - - - - - snorkel - -

CH038 U449129 Rotor Beater Mill Retsch GmbH SR300 OFOI 1 - Grinding 18 21 21 133 B 1 X P 208 - 2500 - - - - - - - - - - - - - - - snorkel - -

CH039 U439441 Knife Mill A Retsch GmbH Grindomix GM 200 OFOI 1 - Grinding 14 11 16 23 B 1 - P 110 - ~ 1000 - - - - - - - - - - - - - - - snorkel - -

CH040 U440055 Knife Mill B Retsch GmbH Grindomix GM 200 OFOI 1 - Grinding 14 11 16 23 B 1 - P 110 - ~ 1000 - - - - - - - - - - - - - - - snorkel - -

CH041 U404669 Ultra Centrifugal Mill A Retsch GmbH ZM 200 OFOI 1 - Grinding 16 15 20 84 B 1 X P 120 - 1300 - - - - - - - - - - - - - - - snorkel - -

CH042 U440013 Ultra Centrifugal Mill B Retsch GmbH ZM 200 OFOI 1 - Grinding 16 15 20 84 B 1 X P 120 - 1300 - - - - - - - - - - - - - - - snorkel - -

CH043 Vacuum Sealer Food Saver FM 5299 OFOI 1 - Grinding 16 8 8 - B 1 - P 120 - ~150 - - - - - - - - - - - - - - - snorkel - -

CH044 Shop Vac OFOI 1 - Grinding 20 20 24 - F 1 - P 110 ~10 - - - - - - - - - - - - - - - - - - -

Sample Storage

CH008 ANKOM Dryer B ANKOM TechnologiesANKOM Rapid Dryer

OFOI 1 - Chemistry Lab 6 10 16 13 in FH 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -

CH009 450308 ANKOM Dryer C ANKOM TechnologiesANKOM Rapid Dryer

OFOI 1 - Chemistry Lab 6 10 16 13 in FH 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -

CH010 U443435 Microplate Reader BioTek Instruments, INC Epoch OFOI 1 - Chemistry Lab 12 13 8 15 B 1 - P 120 - 100 - - - - X - - - - - - - - - - - - -Bio Tek Microplate Spectrophotomer Reader U443435Microplate Spectrophotometer;

CH011 U443435Laptop computer used with Epoch Plate Reader

Hewlett-Packard (HP) ProBook 455 G4 OFOI 1 - Chemistry Lab 15 11 1 6 B 1 - P 120 - 474 - - - - X - - - - - - - - - - - - -

CH012 AA810059A Keyence B Anti Static Blower Keyence Corp. of America SJ-F2000 OFOI 1 - Chemistry Lab 12 6 8 5 B 1 - P 120 0.9 - - - - - - - - - - - - - - - - - - -

CH013 HCl Blotter ANKOM Technologies HCl Blotter H35 OFOI 1 - Chemistry Lab 12 12 7 - B - - - - - - - - - - - - - - - - - - - - - - - -Used to blot acid after acid hydrolysis of fat samples

CH014 U418003 Fat Extractor (A) ANKOM Technologies XT15 OFOI 1 - Chemistry Lab 11 18 25 97 in FH 1 - P 120 10 - - - - - - - - - - - - - - - - - - - attached to the chiller

CH015 U443398 Fat Extractor (B) ANKOM Technologies XT15 OFOI 1 - Chemistry Lab 11 18 25 97 in FH 1 - P 120 10 - - - - - - - - - - - - - - - - - - - attached to the chiller

CH016 U445334 XT Chiller for Fat Extractors Julabo USA Inc F 500 OFOI 1 - Chemistry Lab 15 16 23 82 F 1 - P 115 6 - - - - - - - - - - - - - - - - - - -

XT Chiller U445334JULABO Thermal G is a Chiller designed to work with the Fat Extractors from Ankom. It can connect to two XT units. It should be filled with water or a water/glycol mixture

CH017 GD930 Canister Vacuum Euroclean GD 930 S2 OFOI 1 - Chemistry Lab 18 15 13 F 1 - P 120 10.4 - - - - - - - - - - - - - - - - - - -

CH018 Desiccator BoekelCAT #:1324106 Serial #:181814127

OFOI 1 - Chemistry Lab 12 11 13 22 B 1 - P 115 - ~35 - - - - - - - - - - - - - - - - - -

CH019 U418002 Fiber Analyzer (A) ANKOM Technologies A2000 OFOI 1 - Chemistry Lab 35 22 40 - B 1 X P 120 15 - - - - - - -from WH

- X - - - - - - - - -Hot water from adjacent water heater; run drain line to sink

CH020 U443400 Fiber Analyzer (B) ANKOM Technologies A2000 OFOI 1 - Chemistry Lab 35 22 40 - B 1 X P 120 15 - - - - - - -from WH

- X - - - - - - - - -Hot water from adjacent water heater; run drain line to sink

CH021 Water Heater Bosch ES 2.5-1M WIR OFOI 1 - Chemistry Lab 14 11 15 16 W 1 X P 120 12 - - - - - - - X - X - - - - - - - - - Run overflow valve to sink

CH022 Water Heater Ariston GL 2.5S OFOI 1 - Chemistry Lab 14 11 15 - W 1 X P 120 12 - - - - - - - X - X - - - - - - - - - Run overflow valve to sink

CH023 AA810053A Keyence A Anti Static Blower Keyence Corp. of America SJ-5000 OFOI 1 - Chemistry Lab 12 6 8 13 B 1 - P 120 - 65 VA - - - - - - - - - - - - - - - - - -

CH024 U430407 Centrifuge Thermo Fisher Scientific Legend XTR OFOI 1 - Chemistry Lab 30 27 13 190 B 1 - P 115 11 - - - - - - - - - - - - - - - - - - 4776

CH025 U436924 Centrifuge A RESTEK 755-24 RESTEK OFOI 1 - Chemistry Lab 15 17 18 39 B 1 - P 115 2 - - - - - - - - - - - - - - - - - - -RESTEK Q- sep 3000 (A) Centrifuge U436924Cat. No: 26230; RESTEK Q-Sep 3000

CH026 U436925 Centrifuge B RESTEK 755-24 RESTEK OFOI 1 - Chemistry Lab 15 17 18 39 B 1 - P 115 2 - - - - - - - - - - - - - - - - - - -RESTEK Q-3000 (B) Centrifuge U436925Cat. No: 26230; RESTEK Q-Sep 3000

CH027 Centrifuge Fisher Scientific Micro 17R OFOI 1 - Chemistry Lab 11 17 13 - B 1 - P 120 2.6 - - - - - - - - - - - - - - - - - - -

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:53

PM

QL061

LABORATORYEQUIPMENTMATRIX

CJH

19-0056.001

CJH

FOR EQUIPMENT MATRIX GENERAL NOTES AND ABBREVIATIONS, SEE QL-060

- LC-MS Computer System OFOI 1 - ICP-MS Included above - 2 - P 120 ~5 - - - X - X - - - - - - - - - - - - -

- LC-MS Printer OFOI 1 - ICP-MS Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -

CH091 U441356 LC/MS-MS UPS APC OFOI 1 - ICP-MS 14 30 32 F 1 X P 208-241 - 14000 3 - - - - - - - - - - - - - - - - -

14000 Watt Battery Bakup UPS U44135614,000 Watt Battery Backup Uninterruptible Power Supply (UPS) and 5 tier active power conditioner with 2X external extended backup time battery cabinets for waters XEVO QD LC/MS-MS

CH092 U441357 (a) LC/MS-MS UPS APCBBP-6000-PDW-ONL-W2EBP

OFOI 1 - ICP-MS 10 23 28 F 1 X P 208-241 - 4200 3 - - - - - - - - - - - - - - - - -

4200 Watt Battery Backup UPS U441357For Water XEVO TQD LC/MS-MS; Item # BBP-6000-PDW-ONL-W2EBP

CH093 U441357 (b) LC/MS-MS UPS APCBBP-6000-PDW-ONL-W2EBP

OFOI 1 - ICP-MS 10 23 28 F 1 X P 208-241 - 4200 3 - - - - - - - - - - - - - - - - -

4200 Watt Battery Backup UPS U441357For Water XEVO TQD LC/MS-MS; Item # BBP-6000-PDW-ONL-W2EBP

Equip. Tag User ID Equipment Description Manufacturer Model No.

Fu

rnis

h &

Insta

ll

Exis

tin

g

Pu

rch

ase

New

New

Ro

om

Wid

th (

in)

Dep

th (

in)

He

igh

t (i

n)

Weig

ht

(lb

s)

Mo

un

tin

g

Lo

cati

on

Nu

mb

er

of

Ou

tlets

Ded

icate

d

Cir

cu

its

Hard

Wir

e /

Plu

g

Vo

lt

Am

p

Watt

s

Ph

as

e

Sin

gle

UN

O

Em

erg

en

cy

UP

S

Dis

co

nn

ect

Bo

x

Data

Co

ld W

ate

r

Ho

t W

ate

r

Pu

re W

ate

r

Dra

in

Co

mp

. A

ir

Nit

rog

en

Hyd

rog

en

Heliu

m

Oth

er

Gases

Exh

au

st

Dir

ec

t

Exh

au

st

Ind

irect

Tem

p /

RH

Co

ntr

ol

BT

U /

Ho

ur

Remarks

Washing

CH068 Undercounter Glassware Washer See specifications See specifications CFCI - 1 Washing 24 28 35 206 UC - X HW 208 11 - - - - X - X XFrom Tank

X - - - - - - - - - Pure water from water storage tank

CH069 Vacuum System Pump See specifications See specifications CFCI - 1 Washing 16 25 18 104 UC 1 - P 120 8 - - - - - - - - - - - - - - - - - - -

CH070 U437829 Water Purifier - RO Water Thermo Scientific Pacific RO7 OFOI 1 - Washing 13 13 24 53 W 1 - P 120 5 - - - - - -Tap, 3/4"

connection- - X - - - - - - - - -

Barnstead Pacific RO Water Purification System - Thermo Scientific U437829Barnstead Pacific RO; Order code: 50132386

CH071 U437405 Water Purifier - Ultrapure MilliporeSigma Type 1 Simplicity OFOI 1 - Washing 12 14 20 20 B 1 - P 120 ~5 - - - - - - from RO - - X - - - - - - - - -

CH072 Water Storage Tank - 60 liters MilliporeSigma TANKPE060 OFOI 1 - Washing 15 15 33 131 W - - - - - - - - - - - - - - - - - - - - - - - -Provides pure water to glassware washer

CH073 Water Pump MilliporeSigma ZWDK6L1 OFOI - 1 Washing 11 13 7 - W 1 - P 120 ~2 - - - - - - - - - - - - - - - - - - -

CH074 U445420 Fluid Bed Dryer Retsch GmbH TG 200 OFOI 1 - Washing 16 17 25 47 B 1 X P 208 - ~3,000 - - - - - - - - - - - - - - - - - -

CH075 U449302 Ultrasonic Bath Retsch GmbH UR3 OFOI 1 - Washing 17 13 20 61 B 1 X P 120 - 2000 - - - - - - - - - - - - - - - - - -

Instrument Room

CH076 U441415 HPLC Assembly Agilent Technologies Inc 1260 Infinity OFOI 1 - Instrument Room 72 30 70 F 5 - P 120 - 300 each - - - - X - - - - - - - - - - Snorkel - - On the bench along with a computer

- HPLC Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

- HPLC Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -

CH084 U438893 GC-FID Assembly Agilent Technologies Inc 7890B OFOI 1 - Instrument Room 60 30 75 F 1 X P 120 18.8 - - - - - X - - - -from

cylinder-

from cylinder

from cylinder

X - ~7700

On the bench along with 7560A Liquid Autosampler FID no tagFID Autosampler along with a compute, its own bench and a printer

- GC-FID Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

- GC-ECD Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -

ICP-MS

CH085 U434033 ICP-MS Thermo Fisher Scientific iCAP Q OFOI 1 - ICP-MS 32 29 38 850 B 1 X P 208 - 2200 - - X - X - - - - - - -from

cylinder

Argon, from

dewarX - - 2400

(2) 2.5" exhaust ducts or 1 via T connector; L6-30 plug

CH086 ICP-MS Chiller Thermo Scientific Thermo Flex 2500 OFOI 1 - ICP-MS 17 26 29 F 1 X P 208 12.9 - - - X - - - - - - - - - - - - - - 2500Thermo Scientific ThermoFlex 2500, B A 230/50 T1 IPR DCOM ACOMNeslab Thermo Flex 2500, Chiller for ICP-MS

- ICP-MS Autosampler Teledyne ASX-560 OFOI 1 - ICP-MS 23 22 30 B 1 - P 120 1 - - - X - - - - - - - - - - - - - - -

CH077 U416849 HPLC Finnigan Assembly Thermo Scientific OFOI 1 - Instrument Room 72 30 85 B 5 - P 120 - 550 each - - X - X - - - - - - - - - - Snorkel - -

On a bench with Finnigan Surveyor PDA Plus Detector, Finnigan Surveyor Autosampler Plus, Finnigan Surveyor LC Pump Plus, and Finnigan Surveyor FL Plus Detector, and a computer connected to its own printer

- HPLC Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

CH078 U446625 Combustion Analyzer Elementar CS Version OFOI 1 - Instrument Room 19 22 23 B 1 X P 120 16 - - - X - X - - - - - - - -O2 from cylinder

- Snorkel - -Rapid C Cube CS versionCombustion analyzer for determination of Carbon and Sulfur content.

- Combustion Analyzer Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

- Combustion Analyzer Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -

CH079 U446076 Protein Analyzer ElementarRapid Max N Exceed

OFOI 1 - Instrument Room 22 22 43 B 1 X P 120 16 - - - X - X - - - - - - -from

cylinderO2 from cylinder

- Snorkel - -acquity UPLC/ XEVO TRO LC-MS U433597

- Protein Analyzer Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

CH090 U433597 LC-MS Assembly Waters CorporationAcquity UPLC/ XEVO TRO

OFOI 1 - ICP-MS 72 30 72 - F - - - See below - - - - - - - - - - - -from

generator- -

Argon, from

cylinder- - - -

On the bench along with Acquity UPLC Sample Manager - FTN and Acquity H UPLC CLASS Quarternary Solvent Manager, includes a computer and its own bench with a pump underneath the bench with an Argon gas tank and tank anchor in front and has to be located next to the Peak Infinty 5010 Nitrogren Generator and has power source of "sub panel B and Panel - AS) along with three 4200 Watt Battery Backup UPS

- LC-MS Sample Manager Waters Corporation Acquity OFOI 1 - ICP-MS Included above - 1 - P 120 - 400 - - X - X - - - - - - - - - - - - -

- LC-MS Solvent Manager Waters Corporation Acquity OFOI 1 - ICP-MS Included above - 1 - P 120 - 200 - - X - X - - - - - - - - - - - - -

- LC-MS Computer System OFOI 1 - ICP-MS Included above - 2 - P 120 ~5 - - - X - X - - - - - - - - - - - - -

- UPLC Waters Corporation Acquity OFOI 1 - ICP-MS Included above - - - - - - - - - - - - - - - - - - - - - - - - -

- LC-MS Mass Spec Xevo TQD OFOI 1 - ICP-MS Included above - 1 X P 220 4.5 - - - X - X - - - - -from

generator- -

Argon from

dewar- Snorkel - -

- LC-MS Vacuum Pump Sogevac SV40-BI OFOI 1 - ICP-MS Included above 45 - 1 X P 230 - 1500 - - X - - - - - - - - - - - - - - -

- Protein Analyzer Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -

CH080 U441358 (a) UPS APCBBP-1500-PSW-ONL-W2EP

OFOI 1 - Instrument Room 6 17 9 - B 1 - P 115 - 1050 - - - - - - - - - - - - - - - - - -1050 Watt Battery Backup UPS U441358For Laboratory computers; Item # BBP-1500-PSW-ONL-W2EP

CH081 U441358 (b) UPS APCBBP-1500-PSW-ONL-W2EP

OFOI 1 - Instrument Room 6 17 9 - B 1 - P 115 - 1050 - - - - - - - - - - - - - - - - - -1050 Watt Battery Backup UPS U441358For Laboratory computers; Item # BBP-1500-PSW-ONL-W2EP

CH082 U425448 Spectrophotometer Thermo Scientific 10S-UV-Vis OFOI 1 - Instrument Room 13 15 9 19 B 1 - P 120 ~2 - - - - - X - - - - - - - - - - - - -

CH083 U419048 GC-ECD Assembly Agilent Technologies Inc 7890A OFOI 1 - Instrument Room 61 30 75 F 1 X P 120 18.8 - - - - - X - - - -from

cylinderfrom

cylinderfrom

cylinderfrom

cylinder- - X - 7681

On the bench along with 7693A Automatic Liquid Sampler U426786Automatic liquid sampler, a computer, printer and its own bench

- GC-ECD Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -

- GC-ECD Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -

- ICP-MS Fore Vacuum Pump - - OFOI 1 - ICP-MS Below or behind ICP - F Powered via ICP - - - - - - - - - - - - - - - - - - - - 1100

- ICP-MS Computer System OFOI 1 - ICP-MS 24 24 24 B 3 - P 120 5 - - - X - X - - - - - - - - - - - - -

CH087 Liquid Argon Dewar OFOI 1 - ICP-MS 24 24 48 - F - - - - - - - - - - - - - - - - - - - - - - - -

CH088 U443810 ICP-OES with tableSPECTRO Analytical Instruments Inc.

76004562 OFOI 1 - ICP-MS 49 27 42 F 1 X P 230 - 2450 - - X - X - - - - - - - -Argon from

dewarX - - -

32 amp, slow blow circuit; L6-30 plug. 2 exhaust connections, 150 and 180 CFM

- ICP-OES Autosampler Teledyne ASX-560 OFOI 1 - ICP-MS 23 22 30 B 1 - P 120 1 - - - X - - - - - - - - - - - - - - -

- ICP-OES Computer System OFOI 1 - ICP-MS 24 24 24 B 3 - P 120 5 - - - X - X - - - - - - - - - - - - -

CH089 U441261 LC-MS Nitrogen Generator Peak Scientific Inc Infinity 5010 OFOI 1 - ICP-MS 20 32 46 154 F 1 X P 230 10 - - - X - - - - - -125-145

psi- - - - - - - - Condsate to be collected in container

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:56

PM

QL062

LABORATORYEQUIPMENTMATRIX

CJH

19-0056.001

CJH

FOR EQUIPMENT MATRIX GENERAL NOTES AND ABBREVIATIONS, SEE QL-060

DN

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

CHEMISTRY LAB

C106

EQ & STOR

C107

CHEM & FLAMSTOR

C106A

BALANCE RM

C106B

WASHING

C102

INSTRUMENT RM

C108

CLEAN LAB

C105A

BV

C105 SAMPLE STOR

C103

RECEIPT & DATAENTRY

C101

STOR

CS111

W

CR112

M

CR113

MECH

CM114

ICP-MS

C110GRINDING

C105B

QL120

1

QL130

1

QL140

1

PROVER STATION

120

LARGE MASS

118

RECEIPT DATAENTRY

116

MECH

M116

BV

116A

ECHELON LEVEL1 AND 2

116B

VESTIBULE

123

DOCK STAGING

121

CENTRALRECEIVING

114

MECH/BOILER

M119

DRUM STOR

117

MAIN LAB

112

ENGINE LAB

112A

COOL STOR

112B

KIT PREP

112C

SEED LAB

110

OIL/AFSTOR

112D

M

R107B

W

R107A

VEST

103A

OFFICE

102D

OFFICE

102C

OFFICE

102B

OFFICE

102A

LAB OFFICES

102

MDF

T111

JAN

J109

ELEC

115

AA

BB

CC

DD

EE

FF

GG

HH

JJ

KK

LL

MM

7

7

6

6

5

5

4

4

3

3

2

2

1

1

QL111

1

QL121

1

QL131

1

QL142

1

U

R105

VEND

104

STORAGE

118A

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:40

:59

PM

QL101

OVERALL LABPLAN

JHL

19-0056.001

CJH

1/8" = 1'-0"1

OVERALL LAB PLAN - FIRST FLOOR

N

0' 4' 8' 16' 32'

ME001ME002

ME003

LL

M

6

6

5

5

4

4

3

3

2

2

1

1

3' - 0"3' - 0"3' - 0"

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:00

PM

QL111

BUILDING #663 -ENLARGED LABEQUIPMENT PLAN- PROVERMEZZANINE

JHL

19-0056.001

CJH

1/4" = 1'-0"1

BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PROVER MEZZANINE

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

N

0' 2' 4' 8' 16'

#663

#643

#330

KEY PLAN

QL120 4QL1205

PROVER STATION

120

LARGE MASS

118

VESTIBULE

123

RECEIPT DATAENTRY

116

MECH

M116

BV

116A

ECHELON LEVEL1 AND 2

116B

STORAGE

118A

H

JJ

KK

LL

MM

7

7

6

6

5

5

4

4

3

3

2

2

1

1

LT-06

QL120 3

LS

-01

LT

-01

CA-1@ 48"AFF

12

' -

0"

HC

-1

CW

-1

66

QL1202

SG-A

11

B3604B3604S3608

W3668W3668 FW3668

B3604B3004

1

W3668

B3604F F

F W3668 W3668 W3668

F B3604 B3604 B3604

W3668 W3668

B3604 B3604

1

W3068

B3004

F

F

B3632 B3004F FB3004

1

B3032 S3608F2 B3604 B3632 B2103 F2

1 1

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:03

PM

QL120

BUILDING #663 -ENLARGED LABCASEWORK PLAN& ELEVATIONS -METROLOGY

JHL

19-0056.001

CJH

N

1/4" = 1'-0"1

BUILDING #663 - ENLARGED LAB CASEWORK PLAN - METROLOGY

0' 2' 4' 8' 16'

1/4" = 1'-0"4

EL - ECHELON LEVEL 1 & 2 - EAST

1/4" = 1'-0"5

EL - ECHELON LEVEL 1 & 2 - WEST

1/4" = 1'-0"3

EL - METROLOGY BV - EAST

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

#663

#643

#330

KEY PLAN

1/4" = 1'-0"2

EL - PROVER STATION - WEST

ME028

ME029

ME030

ME031

ME032

ME005

ME014

ME004

ME009

ME010

ME021

ME020

ME019

PROVER STATION

120

LARGE MASS

118

VESTIBULE

123

RECEIPT DATAENTRY

116

MECH

M116

BV

116A

ECHELON LEVEL1 AND 2

116B

ME008

ME012

ME026

ME027

ME007

ME013

ME006

ME017

ME018

ME011

ME015

ME016

STORAGE

118A

HH

JJ

KK

LL

MM

7

6

6

5

5

4

4

3

3

2

2

1

1

5' - 0" 6' - 0"

ME022

ME023

ME

024

ME

025

6' -

0"

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:04

PM

QL121

BUILDING #663 -ENLARGED LABEQUIPMENT PLAN- METROLOGY

JHL

19-0056.001

CJH1/4" = 1'-0"1

BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - METROLOGY

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

N

0' 2' 4' 8' 16'

#663

#643

#330

KEY PLAN

FD

FD

FD

FD

FD

FD

SS-C1

SS-C1

QL130 910

QL130

6

QL130

3

4

5

DRUM STOR

117

MAIN LAB

112

ENGINE LAB

112A

SEED LAB

110COOL STOR

112B

KIT PREP

112C

OIL/AFSTOR

112D

E E

QL130

2

QL130 11

ELEC

115

QL130 7

QL1307

EE

FF

GG

7

6

6

5

5

4

4

3

3

2

2

1

1

LE-A2

LE-A3

LE-A3

LE-A2

LE-A1

LA-B1

FH-4CFH-4C

LS-01MC-03MC-03LT-04

LT-03

LT-03

LS-01

E D

ED

V-2

5' - 0"

QL130

8

M30"

CA-1@ 48"AFF

CA-1@ 48"AFF

3' - 0"

3' -

0"

LT

-05

CA-2

8' - 0" 8' - 0" 8' - 0" 3' - 5"

LE-A2 LE-A2

LE-A2 LE-A2

3' - 5" 8' - 0" 8' - 0" 8' - 0"

EQ EQ EQ EQ EQ EQ EQ

M36"

M36"

4' - 6"

7' - 0"

5' -

0"

8' -

6"

12

LA-B1

LA-B1

LA-B1

LA-B1

LA-B1

LA-B1

LA-B1

LA-B1

LA-B1

LA-B1E DE DE DE D

E D E D E D E D E D

LA-F LA-F

LA-FLA-F

LA

-F

9

12

9

9

ED

1

3 2 3 2 3 2 3 2 3 2 3 2

5 45 4

13' - 6"

9

1

CA-1@ 48"AFF

CA-1@ 48"AFF

7' - 0"

20' - 0"

9

HC-1

LS

-01 E

W-2

HC

-1

HC-1

AVE

AVE

4' -

8"

8' - 3"

LS-01

HC-1

LA-A

9

PB

-A

191919

16

16

18

1818

1818

S3608 B3032 F2T1803

1

P4 K3611 K3611 K3611 K3611 K3611 B2431 B2402 P4B2431B2431B2431B2431

7 8 7 8 7 8 7 8 7 8

K3611 K3611 K3611 B2431 K3611 P4P4 K3611B2407 B2431B2431B2431B2431

7 8 7 8 7 8 7 8 7 8

F2406V3608S3608B3608F2406V3608B3032F F2407F2407 T3004F

1

S3608B2431

1

F L3609

J3673 J3673 J3673

K3611 L3609 F

7 8

F B3608 S3608 F3604 B3632 F

J3662

1

B1531

P4

J3673 J3673 J3673

FV3628 FV3628 FV3628K3611L3609F

7 8

B3608

J3663

15' - 6"

F

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:08

PM

QL130

BUILDING #663 -ENLARGED LABCASEWORK PLAN& ELEVATIONS -PETROLEUM ANDSEED

JHL

19-0056.001

CJH

1/4" = 1'-0"1

BUILDING #663 - ENLARGED LAB CASEWORK PLAN - PETROLEUM ANDSEED

1/4" = 1'-0"3

EL - MAIN LAB - NORTH1/4" = 1'-0"

4EL - MAIN LAB - ISLAND BENCH - SOUTH

1/4" = 1'-0"5

EL - MAIN LAB - ISLAND BENCH - NORTH

1/4" = 1'-0"6

EL - MAIN LAB - SOUTH

1/4" = 1'-0"9

EL - SEED LAB - EAST 1

1/4" = 1'-0"10

EL - SEED LAB - WEST

1/4" = 1'-0"2

EL - ENGINE LAB - SOUTH

1/4" = 1'-0"7

EL - ISLAND BENCH END

1/4" = 1'-0"11

EL - SEED LAB - EAST 2

1/4" = 1'-0"8

EL - SEED LAB - NORTH

1/4" = 1'-0"12

EL - SEED LAB - SOUTH

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

N

0' 2' 4' 8' 16'

#663

#643

#330

KEY PLAN

FD

FD

FD

FD

FD

FD

PE005

PE001

PE002

PE

055

3' -

0"

SE001

SE002

SE003

SE004

SE005

PE029 PE030

PE046

PE031

PE044

PE016

PE011

PE045

PE006

PE017

PE026

PE027

PE008 PE009 PE010

PE007

PE050PE049

PE032

PE033

PE012

PE013

PE014

PE015

PE020

PE021

PE028

PE022

PE023

PE047

PE018

PE034

PE038PE035 PE036

PE037

PE048

PE024

PE025

PE019

SE006

SE

008

SE

007

PE051

PE053

PE039

PE040

PE004

DRUM STOR

117

MAIN LAB

112

ENGINE LAB

112A

SEED LAB

110COOL STOR

112B

KIT PREP

112C

OIL/AFSTOR

112D

4' -

6"

3' - 6"

ELEC

115

PE052

EE

FF

GG

7

7

6

6

5

5

4

4

3

3

2

2

1

1

PE003

PE042

PE043

PE041

PE

054

HYDROGEN- NIC

HYDROGEN- NIC

UNASSIGNED- NIC

UNASSIGNED- NIC

OXYGEN- NIC

PE056

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:10

PM

QL131

BUILDING #663 -ENLARGED LABEQUIPMENT PLAN- PETROLEUMAND SEED

JHL

19-0056.001

CJH

1/4" = 1'-0"1

BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PETROLEUM ANDSEED

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

N

0' 2' 4' 8' 16'

#663

#643

#330

KEY PLAN

CHEMISTRY LAB

C106

BV

C105

CLEAN LAB

C105A

GRINDING

C105B

SAMPLE STOR

C103

RECEIPT & DATAENTRY

C101

STOR

CS111

W

CR112

M

CR113

MECH

CM114

ICP-MS

C110

INSTRUMENT RM

C108

WASHING

C102

BALANCE RM

C106B

CHEM & FLAMSTOR

C106A

EQ & STOR

C107

SS-C1 SS-C1

SS-D1

EW

-1H

C-1

QL1405 6

QL140

2

QL140 3

QL14014 13

QL141 1516

QL141

18

QL14120 QL141 19

QL141

22

23 21

QL141 2425

9

FH

-4D

FH

-4B

FH

-4B

FH

-4A

FH

-6A

CA V N E

CA V E

CA V E

CA V E

CA V

CW E

LA-A

CA E

FH

-4B

CA E

FH

-4A

FH

-4B

CA V

V-1@48"V-1

@48"

CA

-1@

48"

AF

F

CA

-1@

48"

AF

F

LA-B1

LA-B1

LE-A3

LE-A3

LA-B1

LE-A3

LE-A3

LE-A3

LE-A3

LE-A3LE-A3

LE-A3

LE-A2LE-A2

LE-A2

LE-A2

LE-A2

LE-A4

LE-A4

LE-A4

LE-A1

LE-A1

LE-A4

LA-B1

MC

-02

MC

-02

UM-B

LT

-02

LT

-02

LT

-08

LT

-07

MC-01

CW E

LA-P

QL1407

5' -

0"

E

QL140

4

3' -

4"

3' -

4"

15' - 2"

UM-B

E30"

E30"

EQ

EQ

EQ

EQ

8

QL140

9 OPP

15

1313

14 15

E

EE E

2

3

2

554

2

5

3

2

2

3

2

3

2 32 3

2

3

MIN

1' -

0"

MIN

1' -

0"

MIN

1' -

0"

MIN

1' -

0"

E30"

E36"

E36"

E36"

QL14012

11

10

5' -

6"

3' -

0"

1

6" 6"

LT

-07

3' -

0"

2' -

6"

1' - 6"

1' - 6"

QL140 6

CA-1@ 48"AFF

1' -

6"

LE-A3

LE-A3

LA-S

UM-B

LS

-01

LS-01

LS

-01

LS

-01

LS

-02

PB

-A

PB-A

HC

-1

HC

-1

HC-1

LS-01

HC

-1

HC

-1

HC

-1

HC

-1

6' - 0"

1' -

0"

8' -

6"

6' -

1 1

/2"

1' - 0"

12

' -

0"

1' - 3"

10

' -

0"

1' - 3"

2' -

6"

5' -

0"

LS

-01

LS

-01

EE

EE

E

EE

LA-B1

LA

-B1

LA-B2

UM-A

5

QL906

4

QL906

LA-ALA-ALA-ALA-ALA-A

UM-C

LA-ALA-A

LA-A

EQ

EQ

4' -

8"

4' -

0"

4' -

4"

18

QL141

17

6' - 0"

9' - 6"

8' -

6"

LE-A5LE-A5LE-A5LE-A5

3' -

0"

6"

4"

LT

-07

17 17

17

LA-A

V3608 B3632 B3632 B3632 B3632

4' -

6"

F A3608 F3608A3608 T2407

S3648 A2406 F2407 A2406 F2407 A2406 F2407L2431

BASE BASEACID

7

B2431 B3608 B2431 B3608 B2431 F

1

F2 B2431 S3608 B1831 F2406 F2407 B2431 B3604 B2431 F

1

F

17

F FF F

T2407T4208T4208

141313

S3648

F L2431 K3611 L2431 K3611 L2431 F

T3008T3008F S3008 FF

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:15

PM

QL140

BUILDING #643 -ENLARGED LABCASEWORK PLAN& ELEVATIONS -CHEMISTRY

JHL

19-0056.001

CJH

1/4" = 1'-0"1

BUILDING #643 - ENLARGED LAB CASEWORK PLAN - CHEMISTRY

1/4" = 1'-0"2

EL - CHEMISTRY LAB - NORTH 11/4" = 1'-0"

3EL - CHEMISTRY LAB - EAST 1

1/4" = 1'-0"5

EL - CHEMISTRY LAB - WEST 1

1/4" = 1'-0"6

EL - CHEMISTRY LAB - EAST 2

1/4" = 1'-0"13

EL - CLEAN LAB - EAST1/4" = 1'-0"

14EL - CLEAN LAB - WEST

1/4" = 1'-0"9

EL - CHEMISTRY LAB - ISLAND END

1/4" = 1'-0"4

EL - CHEMISTRY LAB - SOUTH 1

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

1/4" = 1'-0"7

EL - CHEMISTRY LAB - WEST 2

1/4" = 1'-0"8

EL - CHEMISTRY LAB - WEST 3

1/4" = 1'-0"10

EL - CHEMISTRY BV - NORTH

1/4" = 1'-0"11

EL - CHEMISTRY BV - SOUTH

1/4" = 1'-0"12

EL - CHEMISTRY BV - WEST

ELEVATIONS CONTINUE ON NEXT SHEET

N

0' 2' 4' 8' 16'

#663

#643

#330

KEY PLAN

1

14' - 6"

1

F2 V3608 F Q2401 S3608 B1531 F2

777

1010

A2406 F2407 S3608 F2B2131B3632K3611B3632

1 717

F S3608 B1831

1

T3608 F T4208 T4208 FF T3608F F

A2406 F2407

1

F

17

1

S3608 F2

15' - 0"

J3663 J3663 J3663

EQEQ

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:18

PM

QL141

BUILDING #643 -ENLARGED LABELEVATIONS -CHEMISTRY

JHL

19-0056.001

CJH

1/4" = 1'-0"15

EL - GRINDING - EAST1/4" = 1'-0"

16EL - GRINDING - WEST

1/4" = 1'-0"18

EL - WASHING - NORTH

1/4" = 1'-0"19

EL - INSTRUMENT RM - EAST

1/4" = 1'-0"20

EL - INSTRUMENT RM - WEST

1/4" = 1'-0"21

EL - STOR. - EAST1/4" = 1'-0"

22EL - STOR. - SOUTH

1/4" = 1'-0"23

EL - STOR. - WEST

1/4" = 1'-0"24

EL - ICP-MS - EAST 1/4" = 1'-0"25

EL - ICP-MS - WEST

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

1/4" = 1'-0"17

EL - CHEM & FLAM STOR - NORTH

0' 2' 4' 8' 16'

CHEMISTRY LAB

C106

BV

C105

CLEAN LAB

C105A

GRINDING

C105B

SAMPLE STOR

C103

RECEIPT & DATAENTRY

C101

STOR

CS111

W

CR112

M

CR113

MECH

CM114

ICP-MS

C110

INSTRUMENT RM

C108WASHING

C102

BALANCE RM

C106B

EQ & STOR

C107

(BELOW)

CH016

CH080

CH081

CH091

CH092

CH093

CH090

CH083CH084

CH076

CH008

CH009

CH014

CH015

CH019

CH020

CH013

CH057

CH058

CH006

CH007

CH070

CH010

CH035

CH027

CH037

CH029

CH028

CH005CH003 CH004

CH050

CH049

CH002

CH017

CH082

CH077

CH085

CH023 CH012

CH039

CH040

CH011

CH059 CH060

CH061

CH031

CH032

CH089

CH062 CH063

CH078

CH045

CH047

CH046

CH025

CH026

CH074CH075

CH038

CH030

CH024

CH088

CH086

CH041

CH042

CH001

CH043

CH071

CH018

CH034

CH033

CH048

CH022

CH021

NITROGEN- NIC

CH073

CH079

CH036

CH044

CH066 CH067

CH065CH064

CH069 CH068

(BELOW)

CH072

CH087

5

QL906

4

QL906

COMPRESSEDAIR -NIC

COMPRESSEDAIR -NIC

HELIUM- NIC

HELIUM- NIC

UNASSIGNED- NIC

NITROGEN- NIC

HYDROGEN- NIC

HYDROGEN- NIC

OXYGEN- NIC

HELIUM- NIC

OXYGEN- NIC

UNASSIGNED- NIC

HELIUM- NIC

UNASSIGNED- NIC

ARGONDEWAR

UNASSIGNED- NIC

UNASSIGNED- NIC

UNASSIGNED- NIC

ARGON- NIC

COMPRESSEDAIR -NIC

NITROGEN- NIC

HELIUM- NIC

COMPRESSEDAIR -NIC

OXYGEN- NIC

HYDROGEN- NIC

HYDROGEN- NIC

ARGON- NIC

CARBONDIOXIDE

CH099

CH054 CH055 CH056

CH094CH095

CH096

CH097

CH098

CHEM & FLAMSTOR

C106A

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:20

PM

QL142

BUILDING #643 -ENLARGED LABEQUIPMENT PLAN- CHEMISTRY

JHL

19-0056.001

CJH

1/4" = 1'-0"1

BUILDING #643 - ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY

LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS

1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

6 OVERHEAD CORD REEL - SEE ELEC

7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

8 DUPLEX DATA OUTLET - SEE ELEC

9 FLOOR DRAIN - SEE PLUMBING

10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP

12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

15 EXISTING FLOOR DRAIN TO REMAIN

16 COAT HOOKS - SEE ARCH

17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

18 EXHAUST DUCT - SEE MECHANICAL

19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS

N

0' 2' 4' 8' 16'

#663

#643

#330

KEY PLAN

CT

R T

OP

H4

" U

NO

1"

SE

E E

LE

CC

AB

H

SE

E C

SW

K T

YP

E

3" NOM

1" UNOUTILITY SPACE

CAB D

CTR TOP D

4"

NO

M

CEILING (SEE ARCH)

WALL CAB

BACKING, TYP

UCL, WHERE INDICATED

RACEWAY (SEE ELEC)

SEALANT, TYP.

SPLASH

CTR TOP

BASE CAB

UTILITY SPACEFRAMING (DASHED)@ 48"O.C. MAX

1" UNO1" UNO

CAB D

UTILITY SPACE

CAB D

CTR TOP D

BENCH TOP ITEMS (DASHED),WHERE OCCURS

CTR TOP

BASE CABINETS

UTILITY SPACEFRAMING (DASHED)@ 48" O.C. MAX

APPLIED BASE,(SEE ARCH)

CT

R T

OP

H

CAB D

SLOPED TOP (DASHED) WHERE INDICATED

APPLIED BASE, (SEE ARCH)

1X WD CLEAT

CT

R T

OP

H

CTR TOP D

CAB D 1" UNO

1x WD CLEAT

ABOVE CTR ITEMS (DASHED), WHERE INDICATED

BACKING, TYP.

APERIMETER

BISLAND / PENINSULA

CPERIMETER - CTR TOP <30" D

PTN (SEE ARCH)

FUMEHOOD

CABINET VENT OUTLET(S) PER MFR, W/ THREADED PE/PP PIPE CONNECTION

CORROSIVES CABINET

CABINET VENT DUCTED DIRECT TO LAB EXHAUST SYSTEM (DASHED), WHERE INDICATED(SEE MECHANICAL)

PTN ORADJOINING UMBILICAL

VERIFY REQ'D SETBACKW/ FH MFR

CABINET VENT OUTLET(S) PER MFR, W/ THREADED PE/PP PIPE CONNECTION

CORROSIVES CABINET

CABINET VENT DUCTED DIRECT TO LAB EXHAUST SYSTEM (DASHED), WHERE INDICATED(SEE MECHANICAL)

PTN ORADJOINING UMBILICAL

CT

R T

OP

H

CTR TOP D

WO

RK

SU

RF

AC

E H

APERIMETER @ FUME HOOD

BPERIMETER

(ISLAND / PENINSULA SIM.) (ISLAND / PENINSULA SIM.)

CLNG (SEE ARCH)

CABINET VENTOUTLETS, CAPPED UNO

FLAMMABLE LIQUID / HAZARDOUS MATERIALCABINET

FUME HOOD (DASHED), WHERE INDICATED

BACK PANELS

ADJOINING CONSTRUCTION BEYOND

AP

RO

N

UTILITY SPACE CAB D 1" UNO.

UTILITY SPACE CLOSURE PANEL

ADJOINING CONSTRUCTION BEYOND

CLOSURE PANEL CAB D 1" UNO.

PTN (SEE ARCH)

CTR TOP D

VARIES 12"

KNEESPACE W

CT

R T

OP

H

18

" U

NO

.

CT

R T

OP

H V

AR

IES

4"

AEL - KNEE SPACE W/ BACK PANEL

BSECTION - BACK PANEL

CSECTION - OPEN TO PTN

REMOVABLE BACK PANEL (DASHED)

FIXED BACK PANEL

FIXED BASE PANEL

POWER / DATA WHERE INDICATED

UNSUPPORTED CTR TOP OR CTR TOP W/ APRON, PER CASEWK TYPES

UNSUPPORTED CTR TOP OR CTR TOP W/ APRON, PER CASEWK TYPES

CTR TOP D

B

C

PTN (SEE ARCH)

UNSUPPORTED CTR TOP OR CTR TOP W/ APRON, PER CASEWK TYPES

SHELF MATERIAL

REMOVABLE SHELF EDGE RETAINER BAR

HORIZONTAL RAIL COVERS, TYP

HORIZONTAL RAIL (UPPER)

SINGLE VERTICAL RAIL

HORIZONTAL RAIL

(LOWER)

RA

IL H

D

HORIZ RAILS, TOP AND BOTTOM

VERT WALL RAIL

ADJ SHELF, TYP

BACKING PER MFR, TYP

SE

E C

SW

K T

YP

E

OUTER SHELF BRACKETS, TYP

DOUBLE VERTICAL RAIL

AT ADJ SHELVING UNITS

AABOVE CTR

CISOMETRIC

CT

R T

OP

H4

9"

NO

M.

D 6" 6" D

ISLAND/PENINSULACABINETS

BASE PLATE UCL, WHERE INDICATED

REINFORCE CTR TOP PER MFR FOR SUPPORT/ ANCHORING OF BENCTOP UPRIGHT FRAMES

VERTICAL SERVICE PEDESTAL (DASHED), WHERE INDICATED

INNER SHELF, TYP.

OUTER SHELF, TYP.

BENCHTOP UPRIGHT FRAME

INVERTED TOP SHELF WHERE INDICATED (NOT SHOWN)

TOP FRAME / SHELF

OPEN

ISLAND / PENINSULA8 3/4" NOM.

D

PERIMETER CABINETS

UCL, WHERE INDICATED

REINFORCE CTR TOP PER MFR FOR SUPPORT/ ANCHORING OF BENCTOP UPRIGHT FRAMES

BASE PLATE

INNER SHELF, TYP.

OUTER SHELF, TYP.

WALL BENCHTOP UPRIGHT FRAME

INVERTED TOP SHELF WHERE INDICATED (NOT SHOWN)

TOP FRAME / SHELF

AISLAND / PENINSULA

BPERIMETER

CA

B H

SLOPED TOP (DASHED) WHERE INDICATED

TALL CABINET

BACKING PER MFR

CAB D

ADJOINING CONSTRUCTION (BEYOND)

1" UNO.

UTILITY SPACE (BEYOND) WHERE OCCURS. CLOSURE PANEL PER CASEWORK TYPES

ADJOINING CONSTRUCTION (BEYOND)

CTR TOP D

EQUIP SPACE

CT

R T

OP

H

BEL - ISLAND / PENINSULA

CSECTION - ISLAND / PENINSULA

ASECTION - PERIMETER

BACK PANEL

UTILITIES VARY -SEE LAB PLANS

CTR TOP

UTILITY SPACE (BEYOND) W/ CLOSURE PANEL

CTR TOP D

C

PTN (SEE ARCH)

CTR TOP

UC EQUIP (DASHED)

ISLAND / PENINSULA

UC EQUIP (DASHED)

1" UNO CAB D

UTILITYSPACE

EQUIP SPACE

AEL - CAB INT - PANEL OVER DOOR

BSECTION - PANEL OVER DOOR

CAB W

CT

R T

OP

H

B

CEILING(SEE ARCH)

2-4" DIA CABINET EXH DUCT COLLAR(S)

EXHAUST DUCT (DASHED) WHERE OCCURS, SEE MECH

PTN(SEE ARCH)

120 V DUPLEX, UNO (CONTROLLED BY SWITCH ABOVE CAB DOOR)

INSULATED CABINET INTERIOR AND DOOR

UTILITY SPACE CAB D 1" UNO

CTR TOP DSWITCH (CONTROLS CABINET DUPLEX)

FLUSH PANEL

CT

R T

OP

D

SEE PLAN AND ELEVATION

KNEE SPACE,UNDERCOUNTER

4" 4"

1' -

0"

4" GROMMET, SEE PLAN FOR LEFT OR RIGHT SIDE LOCATION

FOR FILLER PANEL, CENTER GROMMET ON PANEL

SPLASH

CTR TOP

CT

R T

OP

D

SEE ELEVATION FOR WIDTH

FILLER PANEL

EQ EQ

1' -

0"

SPLASH

CTR TOP

FO

R H

EIG

HT

SE

E E

LE

VA

TIO

N

APPLIED BASE (SEE ARCH)

WATER FITTING

LAB SINK

PTN (SEE ARCH)

PANEL

SEE MEP FOR PLUMBING CONNECTION

SEE MEP FOR PLUMBING CONNECTION

4' -

0"

CE

ILIN

G H

EIG

HT

(S

EE

AR

CH

)

DRIP TRAY

CENTER PEG BOARD ABOVE SINK, UNO

TYP, UNO

2' - 0"

TY

P, U

NO

2' -

6"

8' -

0"

PEG BOARD

RECESSED SAFETY

SHOWER / EYE WASH

4' -

0"

PULL HANDLE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:22

PM

QL901

TYPICALLABORATORYCASEWORK

JHL

19-0056.001

CJH

1/2" = 1'-0"2

SECTION - TYP BASE / WALL CABINETS1/2" = 1'-0"

3SECTION - TYP CORROSIVES CABINETS

1/2" = 1'-0"9

SECTION - TYP FLAM / HAZ CABINETS

1/2" = 1'-0"4

SECTION - TYP KNEE SPACE1/2" = 1'-0"

5SECTION - ADJUSTABLE WALL RAIL SHELVING SYSTEM

1/2" = 1'-0"7

SECTION - BENCH TOP UPRIGHTS

1/2" = 1'-0"8

SECTION - TYP TALL CABINET

1/2" = 1'-0"6

SECTION - TYP EQUIPMENT SPACE

1/2" = 1'-0"10

SECTION - TYP VACUUM PUMP CABINET1/2" = 1'-0"

12GROMMET DETAIL

1/2" = 1'-0"11

SECTION - SINK CAB

1/2" = 1'-0"1

TYPICAL MOUNTING HEIGHTS

WORK SURFACE

4" H NOM TABLE FRAME

2" SQ NOM TABLE LEGS

LOWER H FRAME, LEG RAIL & OFFSET STRETCHER

BEL - FRONT/BACK

APLAN

CTYP

W

TYP UNO1" OVERHANG

DH

BTYP

CEL - SIDES

BACK

FRONT

LE

FT

CT

R T

OP

T

LEVELING DEVICES OR CASTERS AS SCHEDULED

WORK SURFACE

TABLE FRAME

TABLE LEGS

RIG

HT

WORK SURFACE

3" H NOMHVY DUTY TABLE FRAME

2" SQ NOM TABLE LEGS

LOWER U FRAME, LEG RAILS & BACK STRETCHER

BEL - FRONT/BACK

APLAN

CTYP

W

TYP UNO1" OVERHANG

DH

BTYP

CEL - SIDES

BACK

FRONT

LE

FT

CT

R T

OP

T

LEVELING DEVICES OR CASTERS AS SCHEDULED

WORK SURFACE

HVY DUTY TABLE FRAME

TABLE LEGS

RIG

HT

WORK SURFACE

CANTILEVER TABLE FRAME

CART FRAME

BEL - FRONT

APLAN

CTYP

W

D

H (

WK

SU

RF

AC

E)

H (

FR

AM

E)

B

CEL - RIGHT

BACK

FRONT

LE

FT

CT

R T

OP

T

CASTERS, TYPE AS SCHEDULED

WORK SURFACE

CANTILEVER TABLE FRAME

HANGING RAIL

CART FRAME

RIG

HT

1"

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:22

PM

QL902

LABORATORYTABLE ANDMOBILE CARTDETAILS

JHL

19-0056.001

CJH

1/2" = 1'-0"1

DETAIL - STANDARD METAL TABLE FRAME - TYPE A1/2" = 1'-0"

2DETAIL - HEAVY DUTY METAL TABLE FRAME - TYPE B

1/2" = 1'-0"3

DETAIL - STANDARD DUTY MOBILE CART

W D

CLG(SEE ARCH)

PTN

CABINET ANCHOR KIT PER MFR (T&B)

BACKING,TYP

SPEC PURPOSESAFETY CABINET

AELEVATION

BSECTION

H

B

LEV CLG ESCUTCHEON

LEVSWIVEL

LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"

LEV HOOD - CLEAR DOME HOOD;NOMINAL 14" DIAMETER

10"

NO

M

6' -

2"

CE

ILIN

G H

(SE

E A

RC

H)

FLOOR

6"

1' -

0"

1' -

0"

LEV CLG BRACKET

EXH DUCT - SEE MECH

LEV DUCT CONNECTION

LEV LOWER ANCHOR PLATE

LEV UPPER ANCHOR PLATE

SCF SUPPORT FRAMINGSEE ARCH

CLG - SEE ARCH

STRUCTURE ABOVE

FACE OF PTN(SEE ARCH)OR LAB CSWK (SEE LAB PLANS)

SLOTTED CHANNEL FRAMING

GAS CYLINDER BRACKET

NOM 9" DIA GAS CYLINDER,VERIFY W/ OWNER (OFOI)

TOP & BOT BRACKETS & SCF ASSEMBLY (SAFETY STRAPS & CHAINS NOT SHOWN)

NOM 1'-0" OC VERIFY W/ BRACKET MFR

APLAN

BELEVATION

B

1' - 0" 1' - 0"

1' -

3"

AL

IGN

TO

P O

F B

RA

CK

ET

3

' -

0"

CSECTION

BACKING, TYP.

1" MIN TYP

# OF BRACKETS VARIES -SEE PLAN

C

MOUNT BRACKET TO SLOTTED CHANNEL FRAMING

PTN

Z-ANCHORBRACKET @24" OC MAX

BACKING

GAS CYLINDERRACK TUBE FRAME

CYLINDERVERIFY W/ OWNER (OFOI)B

APLAN

BELEVATION

CSECTION

# OF RACK MODULESVARIES, SEE PLAN

12" TYP

RACKTUBING

RA

CK

TU

BIN

G

1-3

CY

LIN

DE

RS

DE

EP

, S

EE

PL

AN

2' -

6"

RACK TUBING

OPEN

OPEN

OP

EN

OP

EN

1' -

3"

FLOOR ANCHORS

SAFETY CHAINS

GAP

C

3' - 0"RACK

TUBINGRACK

TUBING

3' -

0" RA

CK

TU

BIN

G

# OF RACK MODULES VARIES (2 MAX) SEE PLAN

RACK TUBE FRAME

SAFETY CHAINS

DEWAR/TRANSPORTER

APLAN

B

3' -

4"

2' -

0"

BELEVATION

CSECTION

C

OPEN

OPEN

OPEN

OPEN

PTN(SEE ARCH)

Z-ANCHOR BRACKETS, 2 PER MODULE

BACKING

SAFETY CHAINS

FLOOR ANCHORS

RACK TUBING & STIFFENERS

LEV CLG ESCUTCHEON

LEV SWIVEL

LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 60"

LEV HOOD - ROUND METAL HOOD;NOMINAL 10" DIAMETER

10"

NO

M

7' -

10

"CE

ILIN

G H

(SE

E A

RC

H)

FLOOR

6"

1' -

0"

1' -

0"

LEV CLG BRACKET

EXH DUCT - SEE MECH

LEV DUCT CONNECTION

LEV LOWER ANCHOR PLATE

LEV UPPER ANCHOR PLATE

SCF SUPPORT FRAMINGSEE ARCH

CLG - SEE ARCH

STRUCTURE ABOVE

LEV CLG ESCUTCHEON

LEV SWIVEL

LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 60"

LEV HOOD - CLEAR DOME HOOD;NOMINAL 14" DIAMETER

10"

NO

M

7' -

10

"CE

ILIN

G H

(SE

E A

RC

H)

FLOOR

6"

1' -

0"

1' -

0"

LEV CLG BRACKET

EXH DUCT - SEE MECH

LEV DUCT CONNECTION

LEV LOWER ANCHOR PLATE

LEV UPPER ANCHOR PLATE

SCF SUPPORT FRAMINGSEE ARCH

CLG - SEE ARCH

STRUCTURE ABOVE

CLG(SEE ARCH)

AELEVATION - FRONT

BELEVATION - SIDE

B

RAMP

HANDEL

GLASS DOORS (BOTH SIDES)

PARTITION(SEE ARCH)

CH

AM

BE

RH

EIG

HT

AIR FILTER BEHIND REMOVABLE PANEL

WIDTH

CHAMBER

VENTS

FRAMES MOUNTED TO PARTITION

BSECTION

CHAMBERDEPTH

D

CLG(SEE ARCH)

ANCHORCAB PERMFR

AELEVATION

BSECTION

H

EXHAUST DUCT -SEE MECH

B

FIRE PROTECTION

PLUMBING - SEE MEP

W

VENT

HANDLE

ACCESS PANEL

WINDOW MANIFOLD

CINSIDE OF CABINET

SPRINKLER HEAD

GAS CYLINDER

CYLINDER RESTRAINT

LEV CLG ESCUTCHEON

LEVSWIVEL

LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"

LEV HOOD - ROUND METAL HOOD;NOMINAL 10" DIAMETER

10"

NO

M

7' -

10

"CE

ILIN

G H

(SE

E A

RC

H)

FLOOR

6"

1' -

0"

1' -

0"

LEV CLG BRACKET

EXH DUCT - SEE MECH

LEV DUCT CONNECTION

LEV LOWER ANCHOR PLATE

LEV UPPER ANCHOR PLATE

SCF SUPPORT FRAMINGSEE ARCH

CLG - SEE ARCH

STRUCTURE ABOVE

LEV CLG ESCUTCHEON

LEVSWIVEL

LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"

LEV HOOD - SQUARE HOOD;NOMINAL 14" X 12"

10"

NO

M

7' -

10

"CE

ILIN

G H

(SE

E A

RC

H)

FLOOR

6"

1' -

0"

1' -

0"

LEV CLG BRACKET

EXH DUCT - SEE MECH

LEV DUCT CONNECTION

LEV LOWER ANCHOR PLATE

LEV UPPER ANCHOR PLATE

SCF SUPPORT FRAMINGSEE ARCH

CLG - SEE ARCH

STRUCTURE ABOVE

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:24

PM

QL903

LABORATORYDETAILS -ACCESSORIES

JHL

19-0056.001

CJH

1/2" = 1'-0"4

SPECIAL PURPOSE SAFETY CABINET - FLAMMABLE/HAZARDOUS

1/2" = 1'-0"5

SECTION - LOCAL EXHAUST VENT TYPE-A1 (CEILING)

1/2" = 1'-0"1

GAS CYLINDER BRACKET1/2" = 1'-0"

2GAS CYLINDER RACK TYPE A

1/2" = 1'-0"3

GAS CYLINDER RACK TYPE-C (DEWAR/TRANSFER)

1/2" = 1'-0"6

SECTION - LOCAL EXHAUST VENT TYPE-A2 (CEILING)1/2" = 1'-0"

8SECTION - LOCAL EXHAUST VENT TYPE-A4 (CEILING)

1/2" = 1'-0"11

PASS THRU - FLOOR MOUNTED1/2" = 1'-0"

10GAS CYLINDER CABINET

1/2" = 1'-0"7

SECTION - LOCAL EXHAUST VENT TYPE-A3 (CEILING)

1/2" = 1'-0"9

SECTION - LOCAL EXHAUST VENT TYPE-A5 (CEILING)

CE

ILIN

G H

CEILING SHROUD

CEILING (SEE ARCH)

FIXEDPANEL

C

BFRONT AND SIDE ELEVATION (SOUTH AND EAST)

CSECTION

2"

2"

+/-

INTERNAL FRAMING AS NEEDED

APLAN

B

B

Z CLAMPS OR SIMILAR TO ALLOW FOR PANEL REMOVAL

UTILITIES FROM ABOVE CEILING

14"

14"

2' -

2"

10"

UMBILICAL, REMOVABLEPANEL

COUNTERTOP AND CASEWORK, SEE PLANS AND ELEVATIONS

AFFIX TO FLOOR

OPEN BELOW COUNTER

BB

REMOVABLEPANEL

C

ISOMETRIC

2' -

8"

10"

BFRONT

CSIDE

APLAN

C

B

81 3/4"

FIELD VERIFY DIMENSIONS PRIOR TO FABRICATION

29" 2' -

11

"

ADJACENT COUNTERTOP AND CASEWORK, SEE PLAN AND ELEVATIONS

MATCH TOE KICK CUT OUT OF ADJACENT CASEWORK

LOCATE SPLASH GUARD AGAINST SIDES OF ADJACENT CASEWORK, UNDER COUNTERTOP OVERHANG

AFFIX SPLASH GUARD TO WALL AND FLOOR AS NEEDED

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:25

PM

QL904

LABORATORYDETAILS -ACCESSORIES

Approver

19-0056.001

Author

1" = 1'-0"3

UMBILICAL TYPE A

2SPASH GUARD ISOMETRIC

1" = 1'-0"1

SPASH GUARD

CE

ILIN

G H

CEILING SHROUD

CEILING (SEE ARCH)

UMBILICAL, REMOVABLEPANEL

C

BFRONT AND SIDE ELEVATION (SOUTH AND EAST)

CSECTION

2"

2"

+/-

B

36"

UMBILICAL FIXED PANEL

INTERNAL FRAMING AS NEEDED

APLAN

B

B

Z CLAMPS OR SIMILAR TO ALLOW FOR PANEL REMOVAL

UTILITIES FROM ABOVE CEILING

8"

8"

1' -

8"

5"

UMBILICAL, REMOVABLEPANEL

COUNTERTOP AND CASEWORK BELOW, SEE PLANS AND ELEVATIONS

AFFIX TO COUNTERTOP

CE

ILIN

G H

CEILING SHROUD

CEILING (SEE ARCH)

UMBILICAL, REMOVABLEPANEL

C

BFRONT ELEVATION (WEST)

CSECTION

4"

2"

2"

+/-

D D

DSIDE ELEVATION (NORTH AND SOUTH)

6"

36"

36"

UMBILICAL FIXED PANEL

INTERNAL FRAMING AS NEEDED

AFFIX UMBLICAL TO FLOOR

22"

EBACK ELEVATION (EAST)

APLAN

B E

D

D

18"

7"

7"

7"

7"

7"

DUPLEX DATA OUTLETS

DUPLEX 120V OUTLETS

BLANK PANEL FOR FUTURE USE

Z CLAMPS OR SIMILAR TO ALLOW FOR PANEL REMOVAL

POWER AND DATA FROM ABOVE CEILING

26"

8"

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:26

PM

QL905

LABORATORYDETAILS -ACCESSORIES

Approver

19-0056.001

Author

1" = 1'-0"1

UMBILICAL TYPE B

1" = 1'-0"2

UMBILICAL TYPE C

2-FITTING GROUP1-FITTING GROUP

/SIDEOF CABINET

3-FITTING GROUP

ISLA

ND

/P

EN

INS

ULA

BACK SPLASH @ PERIMETER CTR TOP (DASHED)

SERVICE FITINGS

/SIDEOF CABINET

/SIDEOF CABINET

3"

SP

LA

SH

5 1/2" 5 1/2" 5 1/2"

PE

RIM

ET

ER

CT

R T

OP

D

ISL

AN

D /

PE

NIN

SU

LA

7"

ELEC / DATA PEDESTAL

/SIDEOF CABINET

FRONT EDGEOF CTR TOP

6"CUP SINK

CUP SINK - PERIMETER

7" 7"

/SIDEOF CABINET

FITTING HANDLES

CUP SINK -CENTERED ON ISLAND/PENINSULA

SINK

PW SERVICE FITTING

TYPES WHERE OCCURS, SEE LAB PLANS

SPLASH

CTR TOP

CL

SIN

K D

NO

M.

4 1

/2"

CT

R T

OP

D

SERVICES

SINK

3"

10" 10"

SINK BASE CAB

SINK W UNOEQ

UNOEQ

H/C

EW

FLOOR

H -

SE

E P

LA

N

SEE PLAN

SERVICE FITTING

UMBILICAL TO CONCEAL UTILITIES RUNNING FROM THE CEILING TO THE UTILITY CHASE BEHIND THE CASEWORK

STANDING HEIGHT CASEWORK, COUNTERTOP 36" AFF

SITTING HEIGHT CASEWORK, COUNTERTOP 30" AFF

UTILITY CHASE BETWEEN CASEWORK

COUNTERTOPCOUNTERTOP

CUSTOM HEIGHT BACKSPLASH TO FILL BETWEEN THE 30" AND 36" COUNTERTOP

ADD FRAMING AS NEEDED TO SUPPORT CUSTOM BACKSPLASH AND COUNTERTOPS

FLOOR, SEE ARCH

CEILING, SEE ARCH

ACCESS PANEL, SEE UMBILICAL DETAIL

UMBILICAL TO CONCEAL UTILITIES RUNNING FROM THE CEILING TO THE UTILITY CHASE BEHIND THE CASEWORK

STANDING HEIGHT CASEWORK, COUNTERTOP 36" AFF

UTILITY CHASE BETWEEN CASEWORK AND FINISH PANEL

COUNTERTOP

ADD FRAMING AS NEEDED TO SUPPORT FINISH PANEL AND COUNTERTOP

FLOOR, SEE ARCH

CEILING, SEE ARCH

METAL FINISH PANEL

1"

ACCESS PANEL, SEE UMBILICAL DETAIL

W

CUP SINK, WHERE OCCURS

NO

M 3

6"

D

APLAN

B

UPPER BYPASS(DASHED) PERHOOD VENTILATIONTYPE

CEILING ENCLOSURE

CEILING (SEE ARCH)

DUCT AND TRANSITION(SEE MECH)

BASE CABINETS (SEE ELEV)C

TR

T

OP

H

36"

HOOD WORK SURFACE / FLUSH AIRFOIL

SASH

ACCESS PANEL OR REMOVABLE PANEL

4"

CL

G H

(S

EE

A

RC

H)

54

" N

OM

H

UTILITY SERVICES (SEE PLAN)

BELEVATION

PER MFR,TYP

PE

R M

FR

W

NO

M 3

6"

D

APLAN

B

UPPER BYPASS(DASHED) PERHOOD VENTILATIONTYPE

CEILING ENCLOSURE

CEILING (SEE ARCH)

DUCT AND TRANSITION(SEE MECH)

SUPPORT STAND

CT

R

TO

P H

30" HOOD WORK SURFACE /

FLUSH AIRFOIL

SASH

ACCESS PANEL OR REMOVABLE PANEL

4"

CL

G H

(S

EE

A

RC

H)

54

" N

OM

H

UTILITY SERVICES (SEE PLAN)

BELEVATION

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

REVISIONS

SHEET NO

DRAWING NAME

DATE

REVIEWED BY

PROJECT NO

DRAWN BY

10/12/2020

10

/9/2

02

0 4

:41

:27

PM

QL906

LABORATORYDETAILS -SERVICES ANDFUME HOODSECTIONS

JHL

19-0056.001

CJH

1/2" = 1'-0"3

PLAN - DECK MOUNTED FITTING LOCATIONS1/2" = 1'-0"

1TYPICAL SINK SERVICE FITTING PLAN

1/2" = 1'-0"2

EL - WALL FITTING LOCATIONS

1/2" = 1'-0"5

CHEMISTRY MAIN LAB - EAST ISLAND BENCH1/2" = 1'-0"

4CHEMISTRY MAIN LAB - WEST ISLAND BENCH

1/2" = 1'-0"6

FUME HOOD - GENERAL PURPOSE1/2" = 1'-0"

7FUME HOOD - GENERAL PURPOSE - SITTING HEIGHT