Pages-from-2020-10-12_NMSU-NMDA ... - Facilities & Services
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of Pages-from-2020-10-12_NMSU-NMDA ... - Facilities & Services
E E
M
M 95%
PR
E-F
ILT
ER
30%
PR
E-F
ILT
ER
CO
OLIN
G C
OIL
CH
WR
CH
WS
RE
-HE
AT
CO
IL
HT
WR
HT
WS
SUPPLYAIR
MAKE-UPAIR
MIXEDAIR
RETURNAIR
AFMS
U102
EV-3-12
RE
LIE
FA
IR
P-AHU-010 ONLY
MECH. PENTHOUSE
1 NOT TO SCALE
P-AHU-005,006, 010 CONTROL DIAGRAM (VAV)
T
VFD
HSSD
T
VFD
VFD
VFD
T
DPDP
H
LS
E
E
E
M
M 95%
PR
E-F
ILT
ER
30%
PR
E-F
ILT
ER
CO
OLIN
G C
OIL
CH
WR
CH
WS
MIXEDAIR
RETURNAIR
MAKE-UPAIR
AFMS
SUPPLYAIR
RH
C
RH
C
ZONE SENSOR
ZONE SENSOR
HT
WR
HT
WS
HT
WR
HT
WS
VAV
VAV
T
VFD
HSSD
2 NOT TO SCALE
P-AHU-007,009 CONTROL DIAGRAM (VAV)
T
VFD
VFD
VFD
T
T
T
DPDP
DP
LS
SD
H
POSITION
(% FLOW)
SV/VALVE
SETPOINT
SPACE TEMPERATURE
-2°F
0%
10%
20%
30%
40%
-1°F
80%
50%
70%
60%
100%
90%
+1°F +2°F
DAMPER
POSITION
SUPPLY
-3°F
REHEAT VALVE
POSITION
4 NONE
SV TERMINAL UNIT WITH RE-HEAT CONTROL SCHEMATIC
AIR HANDLING UNIT CONTROL POINTS - P-AHU-005,006,010POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESAIR HANDLING UNITS - P-AHU-005,006,010
RETURN AIR RELATIVE HUMIDITY 3 3
RETURN AIR DAMPER 3 3 6 PROVIDE WITH COMMAND AND STATUS
MAKE-UP AIR FLOWRATE 3 3 PROVIDE POINT WITH ALARM SIGNAL
MAKE-UP AIR DAMPER 3 3 6 PROVIDE WITH COMMAND AND STATUS
MIXED AIR TEMPERATURE 3 3
FILTER DIFFERENTIAL PRESSURE 6 6 PROVIDE POINT WITH ALARM SIGNAL
COOLING COIL CONTROL VALVE POSITION 3 3
COOLING COIL LEAVING AIR TEMPERATURE 3 3
RE-HEAT COIL CONTROL VALVE POSITION 3 3
LOW LIMIT DUCT STATIC PRESSURE 3 3 PROVIDE POINT WITH ALARM SIGNAL
FAN START/STOP COMMAND 3 3
FAN SYSTEM FAULT 3 3 PROVIDE POINT WITH ALARM SIGNAL
FAN VFD SPEED 3 3 6
FAN HOA STATUS 3 3 PROVIDE POINT WITH ALARM SIGNAL
FAN INLET AIR FLOWRATE 3 3 PROVIDE TOTAL AIR FLOW CALCULATED
SUPPLY AIR TEMPERATURE 3 3 PROVIDE HIGH AND LOW LIMIT ALARM
HIGH LIMIT DUCT STATIC PRESSURE 3 3 PROVIDE POINT WITH ALARM SIGNAL
SMOKE DETECTOR 3 3 PROVIDE POINT WITH ALARM SIGNAL
ZONE THERMOSTAT 3 3
LN2 O2 SENSOR 1 1 PROVIDE POINT WITH ALARM SIGNAL
EXHAUST VALVE FLOWRATE 2 2
EXHAUST VALVE DAMPER POSITION 2 2
UNIT HEATER - P-UH-001, 3 2 2
OVERALL POINTS 38 16 17 5 76 0
NOTES:
AIR HANDLING UNITS SEQUENCE OF OPERATIONS (P-AHU-005, 006, 010)
FAN OPERATION
1. EACH FAN MOTOR SHALL BE INDIVIDUALLY WIRED TO A FACTORY MOUNTED CONTROL PANEL CONTAINING A SINGLE VFD PER FAN.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE FAN SYSTEM CONTROLS ARE COMPATIBLE WITH THE BMS SYSTEM.
3. FAN SYSTEM CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER TO ASSURE SINGLE SOURCE RESPONSIBILITY FOR FAN VOLUME CONTROLS, AND SHALL REQUIRE ONLY AN INPUT CONTROL SIGNAL FROM THE CONTROLS CONTRACTOR FOR PROPER OPERATION OF THE SYSTEM.
4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT CONTROL PANEL.
5. THE BMS SHALL MONITOR THE FAN ARRAY CONTROL PANEL FOR A FAULT SIGNAL AND SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM.
6. RETURN AIR AND MAKE-UP AIR DAMPERS
a. THE FANS SHALL START ONLY AFTER THE RETURN AIR DAMPER STATUS HAS PROVEN THE DAMPER IS OPEN.
b. WHILE THE FANS ARE IN OPERATION, THE RETURN AIR AND MAKE-UP AIR DAMPER SHALL MODULATE TO MAINTAIN A CONSTANT MAKE-UP AIR FLOWRATE.
c. MAKE-UP AIR DAMPER CLOSE WHEN UNIT IS OFF.
7 FAN SPEED CONTROL
a. THE BMS SHALL MONITOR THE ZONE TEMPERATURE AND SHALL MODULATE THE SUPPLY FAN VFD SPEED TO MAINTAIN ZONE TEMPERATURE SETPOINT.
b. THE SUPPLY FAN VFD SPEED SHALL NOT DROP BELOW 30% (ADJUSTABLE).
c. BMS SHALL MONITOR FAN ARRAY CONTROLLER FOR A FAULT SIGNAL AND SEND AN ALARM.
8 AIRFLOW MEASUREMENT
a. EACH FAN CUBE SHALL BE EQUIPPED FROM THE FACTORY WITH AIRFLOW MONITORING PROBES AND A FLOW MEASURING TRANSDUCER (EQUAL TO +/- 2% ACCURACY OR BETTER). THESE DEVICES SHALL BE FACTORY MOUNTED AND PRESSURE TUBING SHALL BE FACTORY ROUTED.
b. CONTROLS CONTRACTOR SHALL CONNECT BMS TO THE FACTORY MOUNTED TRANSDUCERS AND PROGRAM AN ALGORITHM TO CALCULATE TOTAL AIRFLOW.
ZONE TEMPERATURE CONTROL
1. THE COOLING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN 55°F COOLING COIL LEAVING AIR TEMPERATURE.
2. FAN SPEED AND RE-HEAT CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE.
UNIT HEATER CONTROL
1. SPACE THERMOSTAT SHALL MONITOR SPACE TEMPERATURE AND ENABLE/DISABLE UNIT HEATER TO MAINTAIN SPACE TEMPERATURE ABOVE SETPOINT, 65°F (ADJUSTABLE).
SAFETIES
1. SMOKE DETECTION - A SMOKE DETECTOR SHALL BE HARD WIRED TO THE MOTOR CONTROL CIRCUIT TO SHUTDOWN THE UNIT UPON DETECTION OF SMOKE AND SEND AN ALARM TO THE FIRE ALARM SYSTEM.
2. HIGH DUCT STATIC PRESSURE - A HIGH DUCT STATIC PRESSURE SENSOR SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF DUCT STATIC PRESSURE IN EXCESS OF SETPOINT.
3. LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE AIR HANDLING UNIT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT.
MISCELLANEOUS
1. DIRTY FILTER - THE BMS SHALL MONITOR THE DIFFERENTIAL PRESSURE AT EACH FILTER SECTION AND SIGNAL AN ALARM WHEN DIFFERENTIAL PRESSURES EXCEED SETPOINT.
P-AHU-005, 006 AND 010 SHALL BE DEACTIVATED WHEN FACILITY IS ON EMERGENCY POWER.
AIR HANDLING UNITS SEQUENCE OF OPERATIONS (RTU-N1, RTU-N3)
FAN OPERATION
1. EACH FAN MOTOR SHALL BE INDIVIDUALLY WIRED TO A FACTORY MOUNTED CONTROL PANEL CONTAINING A SINGLE VFD PER FAN.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE FAN SYSTEM CONTROLS ARE COMPATIBLE WITH THE BMS SYSTEM.
3. FAN SYSTEM CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER TO ASSURE SINGLE SOURCE RESPONSIBILITY FOR FAN VOLUME CONTROLS, AND SHALL REQUIRE ONLY AN INPUT CONTROL SIGNAL FROM THE CONTROLS CONTRACTOR FOR PROPER OPERATION OF THE SYSTEM.
4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT CONTROL PANEL.
5. THE BMS SHALL MONITOR THE FAN ARRAY CONTROL PANEL FOR A FAULT SIGNAL AND SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM.
6. RETURN AIR AND MAKE-UP AIR DAMPERS
a. THE FANS SHALL START ONLY AFTER THE RETURN AIR DAMPER STATUS HAS PROVEN THE DAMPER IS OPEN.
b. WHILE THE FANS ARE IN OPERATION, THE RETURN AIR AND MAKE-UP AIR DAMPER SHALL MODULATE TO MAINTAIN A CONSTANT MAKE-UP AIR FLOWRATE.
c. MAKE-UP AIR DAMPER CLOSE WHEN UNIT IS OFF.
7. FAN SPEED CONTROL
a. THE BMS SHALL MONITOR THE DUCT STATIC PRESSURE AND CONTROL FAN SPEED TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT.
b. DUCT STATIC PRESSURE LOCATION AND SETPOINT SHALL BE DETERMINED BY CONTROLS CONTRACTOR.
c. DUCT STATIC PRESSURE SETPOINT SHALL BE DETERMINED BY TAB.
d. BMS SHALL MONITOR FAN ARRAY CONTROLLER FOR A FAULT SIGNAL AND SEND AN ALARM.
e. BMS SHALL INCLUDE DUCT STATIC PRESSURE RESET CAPABILITY ALLOWING THE DUCT STATIC PRESSURE TO BE RESET BASED ON TERMINAL UNIT DAMPER POSITION. IF ALL TERMINAL UNITS IN THE SYSTEM HAVE A DAMPER POSITION LESS THAN 90% OPEN FOR A PERIOD OF 10 MINUTES, THE DISCHARGE STATIC PRESSURE SETPOINT SHALL LOWER 0.1" W.G., AND CONTINUE TO LOWER BY 0.1" W.G. EVERY 10 MINUTES UNTIL SUCH TIME THAT ANY OF THE TERMINAL UNIT PRIMARY DAMPERS OPENS 100%. IF TWO OR MORE TERMINAL UNIT PRIMARY DAMPERS ARE OPEN 100% FOR A PERIOD OF 10 MINUTES, THE DISCHARGE STATIC PRESSURE SETPOINT SHALL INCREASE BY 0.1" W.G. AND CONTINUE TO INCREASE BY 0.1" W.G. EVERY 10 MINUTES UNTIL SUCH TIME THAT ONLY ONE TERMINAL UNIT PRIMARY DAMPER IS OPEN 100% OR THE DISCHARGE STATIC PRESSURE SETPOINT HAS REACHED THE INITIAL SETPOINT DESCRIBED ABOVE.
8. AIRFLOW MEASUREMENT
a. EACH FAN CUBE SHALL BE EQUIPPED FROM THE FACTORY WITH AIRFLOW MONITORING PROBES AND A FLOW MEASURING TRANSDUCER (EQUAL TO +/- 2% ACCURACY OR BETTER). THESE DEVICES SHALL BE FACTORY MOUNTED AND PRESSURE TUBING SHALL BE FACTORY ROUTED.
b. CONTROLS CONTRACTOR SHALL CONNECT BMS TO THE FACTORY MOUNTED TRANSDUCERS AND PROGRAM AN ALGORITHM TO CALCULATE TOTAL AIRFLOW.
ZONE TEMPERATURE CONTROL
1. VERIFY QUANTITY AND LOCATION OF ALL ZONE THERMOSTATS AND RE-HEAT COILS.
2. THE COOLING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN THE COOLING COIL LEAVING AIR TEMPERATURE SETPOINT OF 55°F (ADJUSTABLE).
3. EACH TERMINAL UNIT DAMPER SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE, DOWN TO A MINIMUM POSITION OF 30% AIRFLOW.
4. UPON A ZONE TEMPERATURE DECREASING BELOW ZONE TEMPERATURE SETPOINT BY 1°F (ADJUSTABLE) THE ASSOCIATED RE-HEAT COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE.
SAFETIES
1. SMOKE DETECTION - A SMOKE DETECTOR SHALL BE HARD WIRED TO THE MOTOR CONTROL CIRCUIT TO SHUTDOWN THE UNIT UPON DETECTION OF SMOKE AND SEND AN ALARM TO THE FIRE ALARM SYSTEM.
2. HIGH DUCT STATIC PRESSURE - A HIGH DUCT STATIC PRESSURE SENSOR SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF DUCT STATIC PRESSURE IN EXCESS OF SETPOINT.
3. LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE AIR HANDLING UNIT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT.
MISCELLANEOUS
1. DIRTY FILTER - THE BMS SHALL MONITOR THE DIFFERENTIAL PRESSURE AT EACH FILTER SECTION AND SIGNAL AN ALARM WHEN DIFFERENTIAL PRESSURES EXCEED SETPOINT.
P-AHU-007 AND 009 SHALL BE DEACTIVATED WHEN FACILITY IS ON EMERGENCY POWER.
AIR HANDLING UNIT CONTROL POINTS - P-AHU-007,009POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESAIR HANDLING UNITS - P-AHU-007,009
RETURN AIR RELATIVE HUMIDITY 2 2
RETURN AIR DAMPER 2 2 4 PROVIDE WITH COMMAND AND STATUS
MAKE-UP AIR FLOWRATE 2 2 PROVIDE POINT WITH ALARM SIGNAL
MAKE-UP AIR DAMPER 2 2 4 PROVIDE WITH COMMAND AND STATUS
MIXED AIR TEMPERATURE 2 2
FILTER DIFFERENTIAL PRESSURE 4 4 PROVIDE POINT WITH ALARM SIGNAL
COOLING COIL CONTROL VALVE POSITION 2 2
COOLING COIL LEAVING AIR TEMPERATURE 2 2
LOW LIMIT DUCT STATIC PRESSURE 2 2 PROVIDE POINT WITH ALARM SIGNAL
FAN START/STOP COMMAND 2 2
FAN SYSTEM FAULT 2 2 PROVIDE POINT WITH ALARM SIGNAL
FAN VFD SPEED 2 2 4
FAN HOA STATUS 2 2 PROVIDE POINT WITH ALARM SIGNAL
FAN INLET AIR FLOWRATE 2 2 PROVIDE TOTAL AIR FLOW CALCULATED
SUPPLY AIR TEMPERATURE 2 2 PROVIDE HIGH AND LOW LIMIT ALARM
HIGH LIMIT DUCT STATIC PRESSURE 2 2 PROVIDE POINT WITH ALARM SIGNAL
SMOKE DETECTOR 2 2 PROVIDE POINT WITH ALARM SIGNAL
DUCT STATIC PRESSURE 2 2
ZONE THERMOSTAT 21 21
TERMINAL UNIT SUPPLY AIR FLOWRATE 21 21
TERMINAL UNIT DAMPER POSITION 21 21
TERMINAL UNIT RE-HEAT COIL CONTROL VALVE 21 21
EXHAUST VALVE FLOWRATE 1 1
EXHAUST VALVE DAMPER POSITION 1 1
OVERALL POINTS 65 12 51 2 130 0
NOTES:
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:16
:51
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
M805
MECHANICALCONTROL
Approver
19-0056.001
Author
ROOF
ERU COIL
ERR
ERS
M M
2 NOT TO SCALE
EXHAUST FAN CONTROL DIAGRAM
VFD
DP
LS LS
VFD
ERS
ERR
P-MAU-001
EN
ER
GY
RE
CO
VE
RY
CO
IL
P-MAU-002
EN
ER
GY
RE
CO
VE
RY
CO
IL
P-MAU-003
EN
ER
GY
RE
CO
VE
RY
CO
IL
P-ERU-001
P-ERU-002
P-ERU-003
P-ERU-004
EXHAUSTAIR
EXHAUSTAIR
EXHAUSTAIR
EXHAUSTAIR
ER
U C
OIL
ER
U C
OIL
ER
U C
OIL
ER
U C
OIL
ERS
ERR
ERS
ERR
ERS
ERR
ERS
ERR
ERS
ERR
ERS
ERR
P-PMP-ERW-001
3 NOT TO SCALE
ENERGY RECOVERY SYSTEM CONTROL DIAGRAM
MS
E
SUPPLYAIR
RETURNAIR
30%
PR
E-F
ILT
ER
CO
OLIN
G C
OIL
CH
WR
CH
WS
1 NOT TO SCALE
P-FCU-001 THRU P-FCU-007 CONTROL DIAGRAM
ENERGY RECOVERY SYSTEM SEQUENCE OF OPERATIONS
1. THE PUMP SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE PUMP.
2. THE BMS SHALL MONITOR A CURRENT TRANSDUCER SWITCH FOR STATUS. IF STATUS IS NOT ESTABLISHED WITHIN ONE MINUTE AFTER STARTING THE UNIT, THE BMS SHALL SIGNAL AN ALARM. IF THE STATUS IS LOST AT ANY TIM DURING NORMAL OPERATION, THE BMS SHALL SIGNAL ALARM.
3. THE BMS SHALL MONITOR OUTSIDE AIR TEMPERATURE AND STOP THE SYSTEM PUMP WHEN THE OA TEMPERATURE IS BETWEEN 50°F AND 68°F FOR A PERIOD OF 10 MINUTES, ADJUSTABLE. THE SYSTEM SHALL OTHERWISE RUN AT ALL TIMES.
ENERGY RECOVERY SYSTEM CONTROL POINTSPOINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESENERGY RECOVERY SYSTEM
PUMP STATUS - CURRENT TRANSDUCER 1 1 PROVIDE POINT WITH ALARM SIGNAL
PUMP START/STOP COMMAND 1 1
OVERALL POINTS 0 1 0 1 2 0
NOTES:
EXHAUST FAN CONTROL POINTSPOINT DESCRIPTION AI DI AO DO TOTAL EMS NOTESEXHAUST FANS
DUCT STATIC PRESSURE 4 4 PROVIDE POINT WITH ALARM SIGNAL
FAN STATUS - CURRENT TRANSDUCER 8 8 PROVIDE POINT WITH ALARM SIGNAL
FAN START/STOP COMMAND 8 8
FAN VFD SPEED 8 8 16
FAN HOA STATUS 8 8 PROVIDE POINT WITH ALARM SIGNAL
FAN DISCHARGE DAMPER 8 8 16 PROVIDE COMMAND AND STATUS
HIGH LIMIT DUCT STATIC PRESSURE 0 0 PROVIDE POINT WITH ALARM SIGNAL
LOW LIMIT DUCT STATIC PRESSURE 8 8 PROVIDE POINT WITH ALARM SIGNAL
OVERALL POINTS 12 32 8 16 68 0
NOTES:
EXHAUST FAN SEQUENCE OF OPERATIONS
FAN OPERATION
1. THE FOLLOWING UNITS SHALL BE STARTED AND STOPPED TOGETHER:
a. P-MAU-001 → P-EF-001A, P-EF-001B, P-EF-002A, P-EF-002B
b. P-MAU-002 → P-EF-003A, P-EF-003B
c. P-MAU-003 → P-EF-004A, P-EF-004B
2. DURING NORMAL OPERATION, THE EXHAUST SYSTEM INCLUDES N+1 EXHAUST FANS. BOTH FANS SHALL RUN SIMULTANEOUSLY AND MODULATE SPEED TOGETHER TO MAINTAIN DUCT STATIC PRESSURE.
3. IN THE EVENT THAT A FAN FAILS, IT'S ASSOCIATED DISCHARGE DAMPER SHALL CLOSE, AND THE REMAINING OPERATIONAL FAN SHALL MODULATE SPEED TO MAINTAIN DUCT STATIC PRESSURE.
4. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS. AUTOMATIC BMS START/STOP MAY ALSO BE OVERRIDDEN THROUGH A LOCAL HAND/OFF/AUTO SWITCH AT THE UNIT.
5. THE BMS SHALL MONITOR A CURRENT TRANSDUCER SWITCH FOR STATUS. IF THE STATUS IS NOT ESTABLISHED WITHIN ONE MINUTE AFTER STARTING THE UNIT, THE BMS SHALL SEND AN ALARM. IF THE STATUS IS LOST AT ANY TIME DURING NORMAL OPERATION, THE BMS SHALL SEND AN ALARM.
6. FAN SPEED CONTROL
a. THE BMS SHALL MONITOR DUCT STATIC PRESSURE AND MODULATE THE FAN SPEED TO MAINTAIN SETPOINT.
b. THE CONTROLS CONTRACTOR SHALL LOCATE THE DUCT STATIC PRESSURE AND ESTABLISH THE INITIAL SETPOINT.
c. THE TAB CONTRACTOR SHALL ESTABLISH DUCT STATIC PRESSURE SETPOINT WHEN BALANCING THE SYSTEM.
SAFETIES
1 LOW DUCT STATIC PRESSURE - A LOW DUCT STATIC PRESSURE SENSOR INSTALLED IN THE DUCT SHALL BE INTERLOCKED WITH THE MOTOR CONTROL CIRCUIT SUCH THAT UPON DETECTION OF STATIC PRESSURE BELOW NEGATIVE SETPOINT.
FAN COIL UNIT CONTROL POINTS - P-FCU-001 THRU P-FCU-007POINT DESCRIPTION AI DI AO DO TOTAL EMS NOTES
COOLING COIL CONTROL VALVE POSITION 7 7
FAN START/STOP COMMAND 7 7
FAN STATUS 7 7
SPACE THERMOSTAT 7 7
OVERALL POINTS 7 7 7 7 28 0
NOTES:
FAN COIL UNITS SEQUENCE OF OPERATIONS (P-FCU-001 THRU P-FCU-007)
FAN OPERATION
1. THE FANS SHALL BE CAPABLE OF REMOTE MANUAL START/STOP OR AUTOMATIC START/STOP THROUGH THE BMS.
SPACE TEMPERATURE CONTROL
1. WHILE THE SUPPLY FAN IS ON, THE BMS SYSTEM SHALL MONITOR THE SPACE TEMPERATURE AND SHALL MODULATE THE CHILLED WATER CONTROL VALVE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT.
2. WHILE THE SUPPLY FAN IS OFF, THE BMS SYSTEM SHALL CLOSE THE CHILLED WATER CONTROL VALVE.
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:16
:52
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
M806
MECHANICALCONTROL
Approver
19-0056.001
Author
ABBREVIATIONS
ABBR. DESCRIPTION ABBR.
AMPERAGE
ABOVE COUNTER
ABOVE FINISHED FLOOR
AMP FUSE
AVAILABLE INTERRUPTING CURRENT
ALUMINUM
AMERICAN NATIONAL STANDARDS INSTITUTE
AUTOMATIC TRANSFER SWITCH
AUDIO VISUAL
AMERICAN WIRE GAUGE
CONDUIT
CIRCUIT REAKER
COPPER OR CONDENSING UNIT
DIMMING
DAY-LIGHTING
EMERGENCY
EMERGENCY - CRITICAL
EXHAUST FAN
EMERGENCY - LIFE SAFETY
EMERGENCY - EQUIPMENT
ENERGY RECOVERY UNIT
EXISTING
FIRE ALARM
FIRE ALARM ANNUNCIATOR
FIRE ALARM CONTROL PANEL
FIRE ALARM TERMINAL CABINET
FAN COIL UNIT
FACILITY MANAGEMENT SYSTEM
GROUND FAULT INTERRUPTER
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT EQUIPMENT PROTECTION
GROUND FAULT PROTECTION
GROUND
HORSEPOWER
DESCRIPTION
A
AC
AFF
AFU
AIC
AL
ANSI
ATS
A/V
AWG
C
CB
CU
D
DL
E
EC
EF
EL
EQ
ERU
EX / (E)
FA
FAA
FACP
FATC
FCU
FMS
GFI
GFCI/G
GFEP
GFP
GND/G
HP
THOUSAND CIRCULAR MILS
KILOVOLT
KILOVOLT AMPS
KILOVOLT AMPS REACTIVE
KILOWATT
KILOWATT HOUR
LONG TIME/SHORT TIME/ INSTANTANEOUS & GFP
MOTOR CONTROL CENTER
MAN HOLE
MEGA VOLT AMP
NORMALLY CLOSED
NATIONAL ELECTRIC CODE
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NATIONAL FIRE PROTECTION ASSOCIATION
NORMALLY OPEN
POLE
PUBLIC ADDRESS
PHOTOCELL
ROOM CONTROLLER
SUPPLY FAN
SURGE PROTECTIVE DEVICE
TELEVISION
TYPICAL
UNDER COUNTER
UNDERWRITERS LAB
UNLESS OTHERWISE NOTED
UNINTERRUPTABLE POWER SUPPLY
VOLTS/VOLTAGE
VARIABLE FREQUENCY DRIVE
WALL MOUNTED
WEATHERPROOF & GCFI
WEAHERPROOF
TRANSFORMER
MOUNT 6" ABOVE COUNTER/EQUIP.
KCMIL
KV
KVA
KVAR
KW
KWH
LSIG
MCC
MH
MVA
NC
NEC
NEMA
NFPA
NO
P
PA
PC
RC
SF
SPD
TV
TYP
UC
UL
UON
UPS
V
VFD
W
WG
WP
XFMR/T
"+"
NUMBER
SHEET NUMBER
X PLAN OR DETAILSCALE: 1/4" = 1'-0"X-X
A. ALL AREAS ARE TO BE CONSIDERED AS FINISHED SPACES UNLESS NOTED OTHERWISE. SEE FLOOR PLANS AND DETAILS FOR ADDITIONALREQUIREMENTS. ALL WIRING WORK IS TO BE CONCEALED UNLESS NOTED OTHERWISE. EXPOSED FLEXIBLE WIRING METHODS ARE NOT ALLOWED IN FINISHED SPACES. ANY EXPOSED RACEWAYS SPECIFICALLY ALLOWED BY NOTES ON PLANS ARE TO BE PAINTED TO MATCH THE EXISTING SURFACE FINISH.
B. COORDINATE FINAL LOCATIONS OF ALL DEVICES WITH OWNER ANDARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OFEQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINALLOCATION SO AS NOT TO INTERFERE WITH FURNISHINGS OR WALLMOUNTED ITEMS.
C. COORDINATE LOCATION OF ALL MECHANICAL, PLUMBING AND FIREPROTECTION EQUIPMENT WITH THEIR TRADE DRAWINGS AND INSTALLING CONTRACTORS.
D. EACH BRANCH CIRCUIT IS TO HAVE ITS OWN NEUTRAL WIRE AND IS NOTTO SHARE A NEUTRAL WITH OTHER CIRCUITS.
E. ALL ELECTRICAL WIRING DEVICES ARE TO BE RECESSED (FLUSHMOUNTED) UNLESS NOTED OTHERWISE OR OTHERWISE DIRECTED BYOWNER.
F. NOTE THAT THE IDENTIFICATION LABELS TO BE USED/MADE FOR ALLSYSTEMS MUST USE THE OWNER'S ROOM NUMBERS AND ROOM NAMES,NOT THE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS.MEET WITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS ANDNAMES PRIOR TO LABELING SYSTEMS.
G. ALL FINAL ELECTRICAL PANEL SCHEDULES ARE TO BE UPDATED ANDCONFORM TO THE OWNER'S ROOM NUMBERS AND ROOM NAMES, NOTTHE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS. MEETWITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS AND NAMESPRIOR TO GENERATING FINAL PANEL SCHEDULES.
H. PERFORM ALL CUTTING AND PATCHING NECESSARY TO PERFORM WORK.MATCH EXISTING MATERIALS, FINISHES, FIRE RATINGS, PAINT COLORS,ETC. IN ALL AREAS OF PATCHING.
I. PROVIDE 2#10AWG+1#12AWG BRANCH WIRING FOR ALL 20A BRANCHCIRCUITS LONGER THAN 100 FEET.
J. THE USE OF FLEXIBLE METAL CLAD WIRING (MC) IS LIMITED TO ONLY BEUSED IN CONCEALED LOCATIONS AND IN LENGTHS NOT EXCEEDING 25FT.
K. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FORMECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS.COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
L. ALL WORK MUST COMPLY WITH THE NATIONAL ELECTRICAL CODE 2017EDITION AS ADOPTED BY THE STATE OF NEW MEXICO.
M. SCOPE OF NEW WORK INCLUDES BUT IS NOT LIMITED TO THEFOLLOWING:1. PROVIDE ELECTRICAL DISTRIBUTION, INCLUDING BREAKER AND
BRANCH WIRING;2. PROVIDE BATTERY POWERED EMERGENCY LIFE SAFETY
LIGHTING;3. PROVIDE LIGHTING AND CONVENIENCE POWER OUTLETS;4. PROVIDE CONDUIT AND BOX FOR NEW FIRE ALARM SYSTEM;5. PROVIDE CONDUIT AND BOX FOR DATA COMMUNICATION
SYSTEMS;6. PROVIDE CONDUIT AND BOX SYSTEM FOR SECURITY SYSTEM;
ELECTRICAL GENERAL PROJECT NOTES:
LED 1'X4' LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP
LED 2'X4' LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP
LED 2'X2' LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP
LED HANGING LINEAR LIGHT FIXTURE; LOWER CASE LETTERS INDICATE SWITCHING GROUP; PROVIDE LENGTH AS SHOWN ON PLANS.
TRACK ASSEMBLY AND HEADS; LOWER CASE LETTERS INDICATE SWITCHING GROUP.
WALL SCONCE LIGHT FIXTURE SEE ARCHITECTURAL DRAWINGS/ELEVATIONS FOR MOUNTING HEIGHTS.
EXTERIOR WALL LIGHT FIXTURE; MOUNTING HEIGHT AS NOTED ON PLAN. COORDINATE LOCATION WITH ARCHITECTURAL DRAWINGS/ELEVATIONS.
EXIT LIGHT; PROVIDE NUMBER OF FACES, DIRECTION OF CHEVRONS AND MOUNTING AS SHOWN ON ELECTRICAL AND ARCHITECTURAL DRAWINGS AND AS REQUIRED FOR PATH OF EGRESS. CONNECT TO UNSWITCHED LEG OF LOCAL LIGHT CIRCUIT.
LIGHT FIXTURE, TYPE AS NOTED
LIGHT FIXTURE - BATTERY EMERGENCY LIGHTING UNIT
REMOTE EMERGENCY LIGHTING HEAD
SINGLE POLE, THREE WAY SWITCH AND FOUR WAY SWITCH, 20A RATED MOUNT 44" AFF; LOWER CASE LETTER INDICATES SWITCHING GROUP; LETTER "K" INDICATES KEY OPERATED SWITCH
WALL SWITCH - DIMMER
WALL SWITCH WITH INTEGRAL MOTION/OCCUPANCY SENSOR
LIGHTING CONTROL OCCUPANCY SENSOR -CEILING MOUNTED
LIGHTING CONTROL DAYLIGHT SENSOR -CEILING MOUNTED
LIGHTING CONTROL PHOTOCELL SENSOR -CEILING MOUNTED
ROOM CONTROLLER
EMERGENCY LIGHTING RELAY, SEE DETAIL
LIGHTING CONTROL STATION
TAMPER RESISTANT DUPLEX AND QUADRAPLEX CONVENIENCE RECEPTABLE, MOUNTED 18" AFF U.N.O.
TAMPER RESISTANT DUPLEX OR QUADRAPLEX CONVENIENCE RECEPTABLE, ONE "GREEN" DUPLEX WIRED TO SWITCH CIRCUIT, MOUNT 18" AFF U.N.O.
CEILING MOUNTED RECEPTACLE
FLOOR MOUNTED RECEPTACLE
SPECIAL RECEPTACLE, TYPE AS NOTED
DISCONNECT SWITCH, NUMBERS INDICATE AMPERAGE/# OF POLES; 30A/3P UNO
COMBINATION STARTER/DISCONNECT
MOTOR SYMBOL
HAND HOLE
DESCRIPTION
LEGEND
SYMB. DESCRIPTIONSYMB.
$,$3,$4,$a, $K
$D
OS
OS
ER
FIRE ALARM MANUAL PULL STATION, MOUNT 44"AFF.
FIRE ALARM STROBE LIGHT, MOUNT 80" AFF OR 6" BELOW CEILING, WHICHEVER IS LOWER
SPEAKER ONLY. PROVIDE DEEP 2 GANG 4" SQUARE BACKBOX WITH EXTENSION.
CEILING SPEAKER WITH STROBE LIGHT. PROVIDE DEEP 2-GANG 4" SQUARE BACKBOX WITH EXTENSION RING.
SPEAKER WITH STROBE LIGHT. PROVIDE DEEP 2-GANG 4" SQUARE BACKBOX WITH EXTENSION RING.
PHOTOELEC SMOKE DETECTOR
COMBINATION RATE OF RISE/FIXED TEMPERATURE HEAT DETECTOR
FIRE ALARM DUCT DETECTOR W/ REMOTE TEST AND INDICATING STATION
FIRE/SMOKE DAMPER
MAGNETIC DOOR HOLDER
FIRE ALARM REMOTE ANNUNCIATOR
FIRE ALARM CONTROL PANEL
TAMPER SWITCH
FLOW SWITCH
POST INDICATOR VALVE
CABLE TRAY ABOVE DROPPED CEILING, SEE GENERAL SHEET NOTES.
ELECTRIC POWER PANEL
JUNCTION BOX
TRANSFORMER
CIRCUIT BREAKER
FUSED SWITCH
HOME RUN - 2#12+1#12G IN 3/4"C UNO.
BRANCH CIRCUIT RUN CONCEALED IN CEILING AND WALLS - 2#12+1#12G IN 3/4"C UNO.
THIN LINED DASHED SYMBOL INDICATES EXISTING TO REMAIN UNO.
SEE SHEET NOTE #
F
E###
J J
T
a
a
a
a
a
DL
M
HH
LCS
PC
DH
ANN
FACP
RC
TS
FS
PIV
F
F
P
R/F
12"x4"
ELECTRICAL SHEET LIST
E001 LEGENDS & SPECIFICATIONS
ES101 ELECTRICAL SITE PLAN
EDL121M ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 330
EDP101M ELECTRICAL POWER DEMOLITION FLOOR PLAN - BLDG 330
EL121M ELECTRICAL LIGHTING FLOOR PLAN - BLDG 330
EL122M ELECTRICAL OUTDOOR LIGHTING FLOOR PLAN - BLDG 330
EP101M ELECTRICAL POWER FLOOR PLAN - BLDG 330
EDL101C ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 643
EDP101C ELECTRICAL POWER DEMOLITION FLOOR PLAN - BLDG 643
EP101C ELECTRICAL POWER FLOOR PLAN - BLDG 643
EP102C ELECTRICAL POWER FLOOR PLAN -BLDG 643 - MECH EQUIP
EL121C ELECTRICAL LIGHTING FLOOR PLAN - BLDG 643
EF101C ELECTRICAL TECHNOLOGY FLOOR PLAN - BLDG 643
EP141C ELECTRICAL POWER ROOF PLAN - BLDG 643
EL121N ELECTRICAL LIGHTING FLOOR PLAN - BLDG 663
EP101N ELECTRICAL POWER FLOOR PLAN - BLDG 663
EP102N ELECTRICAL POWER FLOOR PLAN -BLDG 663 - MECH EQUIP
EF101N ELECTRICAL TECHNOLOGY FLOOR PLAN - BLDG 663
EP141N ELECTRICAL POWER ROOF PLAN - BLDG 663
E301N ELECTRICAL LIGHTING SECTIONS - BLDG 663
E401C ELECTRICAL ENLARGED PLANS - BLDG 643
E401N ELECTRICAL POWER ENLARGED PLANS - BLDG 663
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E601CM ELECTRICAL DIAG - BLDG 330 + 643
E601N ELECTRICAL DIAGRAMS - BLDG 663
E701 ELECTRICAL SCHEDULES
E702C ELECTRICAL SCHEDULES
E703C ELECTRICAL SCHEDULES
E704N ELECTRICAL SCHEDULES
E705N ELECTRICAL SCHEDULES
E706 ELECTRICAL SCHEDULES
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:08
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E001
LEGENDS &SPECIFICATIONS
Approver
19-0056.001
Author
.
DN
.
DN
J
J
8166
3904.28'SW2
8165
3904.28'SW2
81153904.34'
SW2
8169
3904.46'BLD3 C
81683904.45'
BLD C
8167
3904.27'BLD
5400
3903.65'CG2
5399
3903.69'CG1
5398
3903.91'GS
52853903.13'
GS
FG4.37
FG4.29
MDP
HH
TS
1
19
2
3
4
5
5
666 7
8
TS 11
10
12
19
9
1
16
16
17
15
20
18
19
21
22
2223
23
23
22
22
24
25
16
13
26
14
28
28
30
SB1
SB1
SB1
SB1 SB1
31
31
31
31
31
31
23
23
22
SB1
SB1
SB1
31
31
3
ES101
2
ES101
ES1014
LDP - 35
SS1SS1SS1SS1SS1
SB131
SB131
29
LDP - 48
BUILDING 330
BUILDING 643
BUILDING 663
S E
SP
INA
ST
.
GREGG ST.
NL TOP OF PARAPET
120' - 0"
NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
LEVEL 1
100' - 0"
NEW LAB LEVEL 1
100' - 0"
NL TOP OF PARAPET
120' - 0"
NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
NL TOP OF PARAPET
120' - 0"
NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
NEW LAB LEVEL 1_CPM
100' - 0"
NL MEZZANINE_CPM
113' - 6"
NEW LAB LEVEL 1
100' - 0"
SS1SS1SS1SS1SS1
30
30
NL TOP OF PARAPET
120' - 0"
NL TOP OF RIDGE
129' - 0"
NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
SC1 SC1 SC1 SC1SC1
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:27
:11
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
ES101
ELECTRICAL SITEPLAN
Approver
19-0056.001
Author
1" = 30'-0"1 ELECTRICAL SITE PLAN
A. SEE ARCHITECTURAL, LANDSCAPING AND CIVIL DOCUMENTS, DRAWINGS AND DETAILS FOR RELATED WORK. COORDINATE ELECTRICAL WORK WITH ALL TRADES AND UTILITY PROVIDERS.
B. EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND SHOWN FOR REFERENCE, EXACT LOCATION AND QUANTITY IS NOT KNOWN. CALL NM811 AND COMPLY WITH STATE STATUTES EXCAVATION LAW NMSA-62-14. COORDINATE WITH UTILITY COMPANIES, REQUEST MARKING, VISIT SITE AND PROCEED CAUTIOUSLY.
C. SEE ELECTRICAL SINGLE LINE E601 FOR ELECTRICAL UTILITY COMPANY INFORMATION.
D. SITE LIGHTING POLE WORK TO INCLUDE POLE, FIXTURE\HEAD, CONCRETE BASE AND WIRING. SEE POLE INSTALLATION DETAILS.
E. ALL EXTERIOR LIGHTS (POLE LIGHTS + WALL LIGHTS) AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE CONTROLLED BY CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E500 SHEETS.
F. ALL EXPOSED PULLBOXES, HANDHOLES, JUNCTION BOXES, OR WIRING ACCESS POINTS ARE TO HAVE TAMPERPROOF SCREWS.
GENERAL SHEET NOTES
1. APPROXIMATE LOCATION OF EXISTING NMDA MEDIUM VOLTAGE UNDERGROUND ELECTRICAL DISTRIBUTION TO REMAIN.
2. APPROXIMATE LOCATION OF NEW ELECTRICAL VAULT TO BE ADDED BY NMDA ELECTRICAL UTILITY, FOR NEW TAP AND FEED TO NEW BUILDING.
3. PROPOSED ROUTING OF NEW MEDIUM VOLTAGE FEEDER BY NMDA ELECTRICAL UTILITY TO CONNECT TO NEW BUILDING TRANSFORMER
4. LOCATION OF NEW ELECTRIC NMDA PAD MOUNTED TRANSFORMER. LOCATE TRANSFORMER PAD WITHIN 10FT OF ROADWAY; COORDINATE FINAL LOCATION WITH NMDA UTILITY. PROVIDE TRANSFORMER PAD WITH VAULT FOR NMDA UTILITY TO INSTALL TRANSFORMER. PROVIDE PER NMDA STANDARDS. COORDIANTE FINAL LOCATION WITH UTILITY. SEE SINGLE E601 FOR ADDITIONAL REQUIREMENTS.
5. PROVIDE BOLLARDS AROUND NEW ELECTRIC TRANSFORMER PER NMDA UTILITY REQUIREMENTS.
6. EXISTING UTILITY EASEMENT ALONG ROADWAY; SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
7. EXISTING SEWAGE DIVERSION STATION SHOWN FOR REFERENCE, SEE CIVIL DRAWINGS.
8. UNDERGROUND SECONDARY SERVICE FEEDER FROM UTILITY TRANSFORMER TO INTERIOR MAIN PANEL MDP IN MAIN ELECTRICAL ROOM. SEE SINGLE LINE E601.
9. EXISTING UNDERGROUND COMMUNICATION VAULT TO REMAIN. SEE COMMUNICATION SITE PLAN.
10. NEW MAIN ELECTRICAL ROOM E115, SEE PLAN ON EP101N.11. NEW MDF ROOM T111, SEE PLAN ON ET101N.12. CONDUITS FOR COMMUNICATION SERVICE ENTRANCE CABLES. SEE
COMMUNICATION SITE PLAN.13. POWER FOR FIRE PROTECTION WATER SERVICE HOTBOX HEATER. STUB-UP
UNDERGROUND AND PROVIDE A WEATHERPROOF GFCI TYPE RECEPTACLE INSIDE HOT BOX. DIRECT BURRY 1”C WITH 2#10+1#10G COORDINATE WITH CIVIL AND PLUMBING CONTRACTORS.
14. HAND-HOLE FOR IRRIGATION CONTROL; PROVIDE SIZE #A PER HAND-HOLE DETAIL. COORDINATE FINAL LOCATION WITH SITE AND IRRIGATION DRAWINGS. PROVIDE 2”C FROM HAND-HOLE, TO IRRIGATION CONTROLLER IN ELECTRICAL ROOM.
15. APPROXIMATE LOCATION OF EXISTING NMDA UNDERGROUND COMMUNICATION CABLES TO REMAIN.
16. EXISTING SITE POLE LIGHT TO REMAIN.17. REMOVE AND RELOCATE EXISTING DIRECT BURIED SITE LIGHT POLE.
REMOVE EXISTING UNDERGROUND ELECTRICAL POWER CIRCUIT FROM POLE BACK TO ADJACENT POWER HAND-HOLE. REINSTALL ON WEST SIDE OF BUILDING, SEE NOTES.
18. REMOVE EXISTING BRANCH PORTION OF SITE LIGHTING CIRCUIT.19. EXISTING UNDERGROUND SITE LIGHTING CIRCUIT TO REMAIN.20. REPLACE EXISTING HANDHOLE WITH NEW 12X12 HANDHOLE21. NEW LOCATION OF SITE LIGHT POLE TO BE RELOCATED. INSTALL DIRECT
BURIED POLE TO MATCH EXISTING CAMPUS STANDARD. 22. NEW SITE LIGHTING CIRCUIT, 2#8+1#10G IN 2”C.23. NEW SITE LIGHTING 12X12 HANDHOLE 24. REMOVE AND RELOCATE EXISTING DIRECT BURIED SITE LIGHT POLE TO
ALLOW FOR DIVE WAY ADJUSTMENTS. RELOCATE\EXTEND EXISTING ADJACENT UNDERGROUND SITE LIGHTING CIRCUIT. SEE NOTES. REINSTALL POLE IN POSITION NORTH-WEST OF EXISTING LOCATION; COORDINATE WITH SITE WORK. INSTALL DIRECT BURIED POLE TO MATCH EXISTING CAMPUS STANDARD. REMOVE ADJACENT HAND-HOLE AND LIGHTING CIRCUIT. SEE NOTES.
25. REMOVE PORTION OF EXISTING UNDERGROUND ELECTRICAL SITE LIGHTING CIRCUIT TO FACILITATE LIGHT POLE RELOCATION AND ROADWAY ADJUSTMENT. INTERCEPT EXISTING UNDERGROUND WIRING AT NORTH AND SOUTH OF ROADWAY AND PROVIDE TWO NEW 12X12 HAND-HOLE. INTERCEPT AND EXTEND EXISTING CIRCUIT IN NEW 2”C BETWEEN THE NEW HAND-HOLES. REMOVE EXISTING CONDUIT AND WIRE BETWEEN INTERCEPTION POINTS. COORDINATE WITH CIVIL AND SITE WORK.
26. POWER FOR DOMESTIC WATER SERVICE HOTBOX HEATER. STUB-UP UNDERGROUND AND PROVIDE A WEATHERPROOF GFCI TYPE RECEPTACLE INSIDE HOT BOX. DIRECT BURRY 1”C WITH 2#10+1#10G COORDINATE WITH CIVIL AND PLUMBING CONTRACTORS.
27. SURFACE MOUNTED LINEAR LIGHT FIXTURE MOUNTED TO METAL CANOPY. INSTALL FIXTURE RECESSED UP INTO FLUTE POCKET. CONCEAL ALL WIRING; INSTALL WIRING IN CONDUIT ON ROOF. WIRING 2#8+1#8G IN ¾” IMC. COORDINATE WIRING INSTALLATION METHODS WITH CANOPY MANUFACTURER. SEAL ALL PENETRATIONS. COORDINATE WITH ARCHITECTURAL DETAILS.
28. STEP LIGHT MOUNTING IN WALL ADJACENT TO RAMP.29. POWER FOR DOMESTIC WATER SERVICE HOTBOX HEATER. STUB-UP
UNDERGROUND AND PROVIDE A WEATHERPROOF GFCI TYPE RECEPTACLE INSIDE HOT BOX. DIRECT BURRY 1”C WITH 2#10+1#10G COORDINATE WITH CIVIL AND PLUMBING CONTRACTORS.
30. WALL SCONCE WITH ICON ON FRONT VERTICAL FACE, COORDINATE MOUNTING HEIGHT, SEE DETAIL…
31. SITE LIGHTING BOLLARD AND BASE. COORDINATE FINAL LOCATION WITH ARCHITECT AND LANDSCAPING DRAWINGS.
SHEET KEYNOTES
NORTH
1/8" = 1'-0"2 OUTSIDE LAB WALL ELEVATIONS - NORTH FACING SOUTH
1/8" = 1'-0"3 OUTSIDE LAB WALL ELEVATIONS - SOUTH FACING NORTH1/8" = 1'-0"4 ELECTRICAL SITE PLAN - WALK WAY
31
ALTERNATE #3
27 27 27 27 27
OS
OS
OS OS
OSOSOS
PP
PP
PP PP
PP
PP
OS
OS
OS OS
OSOSOS
PP
PP
PP PP
PP
PP
?
?
1
5
2
3
3
OFFICE
106
STORAGE
107
OFFICE
108
OFFICE
110
COPY
111
WOMEN
112
MEN
113
MEP
114
ENTRY
101
OFFICE
105
OFFICE
104B
OFFICE
104A
OFFICE
103
BREAK
102
OFFICE
104
FIRE RISER
109
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:25
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EDL101C
ELECTRICALLIGHTINGDEMOLITIONFLOOR PLAN -BLDG 643
Approver
19-0056.001
Author
1/4" = 1'-0"1 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 643
A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.
B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.
C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.
D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.
E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.
F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.
G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.
H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.
I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.
GENERAL SHEET NOTES
1. REPLACE ALL INTERIOR LIGHT FIXTURES INSIDE BUILDING WITH NEW; SEE ARCHITECTURAL CEILING PLANS. REMOVE FIXTURES, CONTROLS AND WIRING BACK TO PANEL. SEE NEW WORK PLANS
2. REPLACE EXISTING LOBBY LIGHTING, SEE NEW WORK PLAN. MAINTAIN WIRING TO RECONNECT.
3. REPLACE TOILET ROOM LIGHTS IN SAME LOCATION. SEE NEW WORK PLAN.4. REPLACE MECHANICAL ROOM LIGHTS IN SAME LOCATION. SEE NEW WORK
PLAN.5. EXISTING OUTDOOR CANOPY FIXTURES ARE TO REMAIN.
SHEET KEYNOTES
NORTH
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
1
?
?
METROLOGY LAB
137
VEST
141
PROVER
142
STOR
140
MASS
139
MASS
138
ECHELON 1
136
OFFICE
146
ENGINE LAB
101
STOR
110
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:27
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EDL121M
ELECTRICALLIGHTINGDEMOLITIONFLOOR PLAN -BLDG 330
Approver
19-0056.001
Author
1/8" = 1'-0"1 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BLDG 3301/8" = 1'-0"2 330 BASEMENT LEVEL ELECT LTG DEMO
ELECTRICAL PUMPS
GENERAL SHEET NOTES
1. REMOVE LIGHTS FIXTURES, CONTROLS AND BRANCH WIRING IN ROOM. MAINTAIN CIRCUIT TO REUSE FOR NEW LIGHTING. SEE NEW WORK PLANS
SHEET KEYNOTES
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.
B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.
C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.
D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.
E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.
F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.
G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.
H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.
I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.
GF
CI
J
J
J
J
GF
CI
GF
CI
GF
CI
J
J
GF
CI
GF
CI
GF
CI
GF
CI
GF
CI
GF
CI
GF
CI
J
J
J
J
J
J
J
J
J
J
J
J
J
GFCI
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
2
1
8
5
5
67
1
4
1
3
OFFICE
106
STORAGE
107
OFFICE
108
OFFICE
110
COPY
111
WOMEN
112
MEN
113
MEP
114
ENTRY
101
OFFICE
105
OFFICE
104B
OFFICE
104A
OFFICE
103
BREAK
102
OFFICE
104
FIRE RISER
109
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:27
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EDP101C
ELECTRICALPOWERDEMOLITIONFLOOR PLAN -BLDG 643
Approver
19-0056.001
Author
1/4" = 1'-0"1 ELECTRICAL POWER DEMOLITION PLAN - BLDG 643
NORTH
GENERAL SHEET NOTES
1. EXISTING ELECTRICAL PANEL TO REMAIN. REMOVE CIRCUITING AS REQUIRED FOR DEMOLITION WORK.
2. REMOVE ALL DEVICES AND WIRING IN ROOM TO ALLOW FOR RENOVATION. EXISTING RACEWAYS MAY BE ABANDONED IN WALLS THAT ARE TO REMAIN; REMOVE CONDUCTORS. REMOVE COMPLETE RACEWAYS WHERE PARTITIONS ARE BEING REMOVED. REMOVE ALL EXISTING DATA OUTLETS AND CABLES BACK TO DATA RACK. REMOVE COMPLETE FIRE ALARM SYSTEM AND DEVICES. SEE NEW WORK PLANS.
3. EXISTING DATA RACKS HIGH ON WALL AND ASSOCIATED ELECTRICAL DEVICES ARE TO REMAIN
4. EXISTING ELECTRICAL DEVICES IN ENTRY TO REMAIN.5. EXISTING ELECTRICAL DEVICES IN TOILET ROOMS TO REMAIN6. EXISTING ELECTRICAL DEVICES IN MECHANICAL ROOM TO REMAIN.7. EXISTING ELECTRICAL VFD\STARTER TO REMAIN. 8. DISCONNECT AND REMOVE CEILING MOUNTED DUPLEX RECEPTACLE AND
PROJECTOR MOUNTING PLATE TO ALLOW FOR CEILING REMOVAL. RETAIN AND RE-SUPPORT FROM STRUCTURE AFTER CEILING REMOVAL.
SHEET KEYNOTES
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.
B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.
C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.
D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.
E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.
F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.
G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.
H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.
I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.
J
J J
J J
J
STOR
MA101
1
1
2
M
PROVER
142VEST
141STOR
140
MASS
139
MASS
138
ECHELON 1
136
METROLOGY LAB
137
OFFICE
146
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:29
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EDP101M
ELECTRICALPOWERDEMOLITIONFLOOR PLAN -BLDG 330
Approver
19-0056.001
Author
1/8" = 1'-0"1 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BLDG 330
GENERAL SHEET NOTES
1. EXISTING ELECTRICAL PANEL TO REMAIN. REMOVE CIRCUITING AS REQUIRED FOR DEMOLITION WORK.
2. REMOVE ALL DEVICES AND WIRING IN ROOM TO ALLOW FOR RENOVATION. EXISTING RACEWAYS MAY BE ABANDONED IN WALLS THAT ARE TO REMAIN; REMOVE CONDUCTORS. REMOVE COMPLETE RACEWAYS WHERE PARTITIONS ARE BEING REMOVED. REMOVE ALL EXISTING DATA OUTLETS AND CABLES BACK TO DATA RACK. REMOVE FIRE ALARM DEVICES. SEE NEW WORK PLANS.
3. EXISTING DATA RACKS TO REMAIN.
SHEET KEYNOTES
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
A. DISCONNECT AND REMOVE ITEMS, DEVICES, OR EQUIPMENT SHOWN ON THE DEMOLITION PLANS OR INDICATED FOR REMOVAL ON A COMBINATION DEMOLITION/NEW WORK PLAN. REMOVAL TO INCLUDE ALL ASSOCIATED: WIRING BACK TO THE POWER SOURCE; DISCONNECT SWITCHES; STARTERS; CONTROLS; BOXES; EXPOSED PORTIONS OF RACEWAYS THAT WILL BECOME EMPTY AFTER REMOVING THE WIRING TO DEMOLISHED EQUIPMENT, RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX. MAINTAIN POWER TO LOADS THAT ARE TO REMAIN, IN OR ADJACENT TO THE AREA OF DEMOLITION, BUT FEED FROM CIRCUITS ALSO USED IN THE AREA OF DEMOLITION; INTERCEPT AND EXTEND WIRING AS REQUIRED. CLEARLY MARK BREAKERS IN EXISTING PANEL AS "SPARE" FOR DEMOLISHED CIRCUITS AND UPDATE PANEL SCHEDULES.
B. PROVIDE ALL NECESSARY SUPPORTS, IN A CODE COMPLIANT MANNER, FOR EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. PROVIDE PERMANENT SUPPORTS WHERE REQUIRED AND PROVIDE ALL TEMPORARY SUPPORTS WHERE REQUIRED TO FACILITATE AND ACCOMMODATE PHASING OF CONSTRUCTION.
C. REMOVAL ALL EXISTING ABANDONED EXISTING ELECTRICAL RACEWAYS, WIRING, CABLE, DEVICES AND EQUIPMENT WHERE CEILINGS, WALLS, OR STRUCTURE ARE REMOVED. RACEWAYS MAY BE ABANDONED WHERE THEY ARE CONCEALED BY NEW CONSTRUCTION; LABEL ALL ABANDONED RACEWAYS AT EACH JUNCTION BOX.
D. ALL ITEMS SHOWN IN THE AREA OF DEMOLITION ARE INDICATIVE OF EXISTING QUANTITY AND LOCATION OF EXISTING ITEMS, VERIFY ACTUAL QUANTITIES AND INCLUDE IN BID. COORDINATE EXTENT OF DEMOLITION WORK WITH ARCHITECTURAL DRAWINGS.
E. WHERE A PIECE OF EQUIPMENT IS FED BY AN UNDER-SLAB OR IN-SLAB RACEWAY, CUT THE RACEWAY FLUSH WITH THE FLOOR AND PLUG & SEAL OPENING.
F. MAINTAIN EQUIPMENT, DEVICES AND WIRING AS REQUIRED TO ACCOMMODATE PHASING OF PROJECT.
G. DISCONNECTION OF MECHANICAL EQUIPMENT TO INCLUDE ALL ASSOCIATED SYSTEMS INCLUDING BUT NOT LIMITED TO: WIRING, LINE VOLTAGE CONTROLS & INTERLOCKS, STARTERS, DISCONNECT SWITCHES.
H. ALL EQUIPMENT AND OR MATERIAL BEING REMOVED IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE RETAINED, DISPOSED OF, AND REMOVED FROM THE SITE AT THE DIRECTION OF THE OWNER.
I. DEMOLITION WORK IS TO INCLUDE COMPLETE AND ENTIRE REMOVAL OF ALL COMPONENTS, APPURTANCES AND EQUIPMENT AND WIRING.
STOR
MA101
MARKETING
M136
?
?
10' - 0"
A22A22 A22 A22
A22A22 A22 A22
A22A22 A22 A22
A22A22 A22 A22
A22A22 A22 A22
A22A22 A22 A22
A22 A22 A22
A22
EM
EM
X1
1 (TYP)
FP24
FP24
FP24
1 (TYP)
A1
A2
C1
C2
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:32
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EL121M
ELECTRICALLIGHTING FLOORPLAN - BLDG 330
Approver
19-0056.001
Author
GENERAL SHEET NOTES
1. CONNECT NEW FIXTURES TO EXISTING LIGHTING CIRCUIT.
SHEET KEYNOTES
1/8" = 1'-0"1 ELECTRICAL LIGHTING FLOOR PLAN - BLDG 330
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. REPLACE SELECT INTERIOR LIGHT FIXTURES INSIDE BUILDING WITH NEW;
SEE ARCHITECTURAL CEILING PLANS. RETAIN WIRING IN AREA WHERE CEILING IS BEING REINSTALLED. IN AREAS WHERE CEILING IS CHANGING TO OPEN STRUCTURE, REMOVE ALL EXISTING DEVICES, WIRING AND RACEWAYS BACK TO CORRIDOR CEILING AREA, TO ALLOW FOR INSTALLATION OF NEW WIRING SYSTEM. SEE NEW WORK PLANS
C. CONNECT ALL BATTERY POWER EMERGENCY LIGHTS TO UNSWITCHED LEG OF LOCAL LIGHTING CIRCUIT TO CHARGE BATTERIES AND SENSE POWER LOSS TO ILLUMINATE LAMPS.
D. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL CEILING PLANS.
E. PROVIDE NEW LIGHTING CONTROL THROUGHOUT ALL RENOVATED SPACES, REFER TO E-701 SHEETS FOR LIGHTING CONTROL DIAGRAMS.
F. ALL EXTERIOR LIGHTS WALL LIGHTS AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE TO BE CONTROLLED BY NEW CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E701.
G. PROVIDE SUPPORTS AT DIAGONAL CORNERS OF EACH LIGHT FIXTURE IN ALL T-GRIDS. EXTEND SUPPORT UP TO STRUCTURE.
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
1
1
PANEL (E)B -1
PANEL (E)B -2
SW2SW2SW2
SW1
SW1
2
2
333
SW2
3
4
5
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:39
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EL122M
ELECTRICALOUTDOORLIGHTING FLOORPLAN - BLDG 330
Approver
19-0056.001
Author
1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - DEMOLITION
1/8" = 1'-0"3 ELECTRICAL LIGHTING FLOOR PLAN - NEW2
ALTERNATE #4
ALTERNATE #4
ALTERNATE #5
GENERAL SHEET NOTES
1. REMOVE AND REPLACE EXISTING EXTERIOR FIXTURE IN SAME LOCATION. SEE NEW WORK PLANS
2. REPLACE EXISTING EXTERIOR FIXTURE IN SAME LOCATION AND RECONNECT TO EXISTING CIRCUIT\CONTROLS.
3. PROVIDE NEW EXTERIOR WALL LIGHT FIXTURE ON EXISTING WALL. INSTALL 12” BELOW TOP OF WALL. COORDINATE EXACT LOCATIONS WITH ARCHITECTURAL ELEVATIONS. CONCEAL ALL WIRING. PROVIDE NEW 2#12+1#12G CIRCUIT TO EXISTING PANEL “B”; ROUTE WIRING ABOVE EXISTING CEILINGS. REMOVE AND REINSTALL CEILING TILES AS NEEDED.
4. PROVIDE NEW CIRCUIT FOR ADDED EXTERIOR WALL LIGHTS. REMOVE EXISTING 2POLE BREAKER CKT 82/84 IN SECTION-2 AND REPLACE WITH TWO 20A/1P BREAKER. CONNECT NEW LIGHTS TO CKT#82.
5. PROVIDE NEW ASTROLOGICAL TIME CLOCK TO CONTROL ADDED EXTERIOR LIGHTS.
SHEET KEYNOTES
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. REPLACE SELECT EXTERIOR LIGHT FIXTURES WITH NEW; SEE
ARCHITECTURAL ELEVATIONS. RETAIN WIRING. C. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL
ELEVATIONS.D. ALL ADDED NEW EXTERIOR LIGHTS WALL LIGHTS ARE TO BE CONTROLLED
BY NEW TIME CLOCK.E. REFER TO E701 FOR LIGHT FIXTURE SCHEDULE.
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
J
J
J
J
J
J
J
J
MARKETING
M136
STOR
MA101
?
?
A1-9
1
2
3
2
3
2
3
2
3
A1
A2
C1
C2
A1-8
A1-7
A1-6
A1-5
A1-4
A1-3
A1-12
A1-1
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:53
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP101M
ELECTRICALPOWER FLOORPLAN - BLDG 330
Approver
19-0056.001
Author
GENERAL SHEET NOTES
1. RECEPTACLE FOR COPIER; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.
2. NEW POWER CONNECTION TO FURNITURE, COORDINATE EXACT LOCATION WITH ARCHITECT. 2-GANG J-BOX COVER FOR FURNITURE WHIP CONNECTION. BRANCH CIRCUIT FOR PWR 3/4”C WITH 9#12+1#12G ROUTED CONCEALED IN WALL, AND STUB UP INTO CEILING, THEN EXTENDED TO POWER PANEL. CONNECT FLEXIBLE WHIP FURNISHED WITH THE FURNITURE. COORDINATE ACTUAL LOCATION WITH FURNITURE PROVIDER.
3. NEW DATA CONNECTION TO FURNITURE, COORDINATE EXACT LOCATION WITH ARCHITECT. 2-GANG J-BOX COVER FOR FURNITURE WHIP CONNECTION. PROVIDE TWO 1.25"C FOR COMMUNICATION CABLES; ROUTED CONCEALED IN WALL, AND STUB UP INTO CEILING. CONNECT FLEXIBLE WHIP FURNISHED WITH THE FURNITURE. COORDINATE ACTUAL LOCATION WITH FURNITURE PROVIDER. SEE TECHNOLOGY DRAWINGS.
SHEET KEYNOTES
1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 3301/8" = 1'-0"2 330 BASEMENT LEVEL ELECT POWER
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND
ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.
C. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
D. AVOID BACK-TO-BACK ELECTRICAL BOXES (RECEPTACLES, TELECOM OUTLETS, SWITCHES) BETWEEN CLASSROOMS. IF BOXES OCCUR IN THE SAME STUD-SPACE CAVITY, PROVIDE SOUND PUTTY PAD OVER BOXES SERVING ONE ROOM.
E. PROVIDE CAT6 COMMUNICATION CABLES TO NEW DATA OUTLETS AND WIRELESS ACCESS POINTS (WAP). SEE SPECIFICATIONS. ALL DATA OUTLETS AND WAP’S SHOWN ON SHEET ARE NEW UNLESS NOTED OTHERWISE. PROVIDE SLACK CABLE AT EACH END OF NEW DATA CABLES: 10FT IN IDF + 12FT IN CEILING AT EACH OUTLET.
F. COMMUNICATION CABLES INSTALLATION: ALL NEW DATA CABLES ARE TO BE RUN CONCEALED; CONCEAL IN CEILINGS; INSTALL IN 1”EMT WHERE EXPOSED. PROVIDE J-HOOK SUPPORT ABOVE CEILINGS
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
J
J
J
J
J
J
JJJ
J
J
J
J
CHEMISTRY LAB
C106
BV
C105
CLEAN LAB
C105A
GRINDING
C105B
SAMPLE STOR
C103
RECEIPT & DATAENTRY
C101
STOR
CS111
W
CR112
M
CR113
MECH
CM114
ICP-MS
C110
INSTRUMENT RM
C108
WASHING
C102
BALANCE RM
C106B
CHEM & FLAMSTOR
C106A
EQ & STOR
C107
(E) LB3(E) LB4
(E) LB1
1
1
1
1
1
1
1
1
1
1
22
2
2
2
2
2
2
2
5 5
3
4
(TYP)
(TYP)
3
4
(TYP)
(TYP)
6
6
(E) SDP2
(EX)
WG
13
(E) LB2
(E) LB4 - 7,9
(E) LB4 - 6,8
(E) LB4 - 3,5
(E) LB4 - 2,4
(E) LB4 - 14,16
(E) LB4 - 11,13(E) LB1 - 4,6
(E) LB1 - 3,5
(E) LB4 - 10,12
(E) LB4 - 15
(E) LB4 - 22
(E) LB4 - 18
(E) LB4 - 20
(E) LB4 - 21,23
9
12 11
10
(TYP)
13 13
(E) LB4 - 24
(E) LB4 - 25
(E) LB4 - 26
(E) LB4 - 27
(E) LB4 - 28
(E) LB4 - 35(E) LB4 - 36
(E) LB4 - 34 (E) LB4 - 33
(E) LB4 - 32
(E) LB4 - 31(E) LB4 - 30
(E) LB4 - 29
(E) LB4 - 37
IT
CT101A
FIRE
C109(E) LB4 - 17,19
7
8
(E) LB4 - 38
(E) LB4 - 39
(E) LB4 - 40 (E) LB4 - 42
(E) LB4 - 41(E) LB4 - 43
(E) LB4 - 44
(E) LB4 - 46,48
(E) LB4 - 45
(E) LB4 - 49
(E) LB4 - 53
(E) LB4 - 52
(E) LB4 - 51
(E) LB4 - 50
14
(E) LB4 -43
(E) LB3 - 7
(E) LB3 - 6
(E) LB3 - 4
(E) LB3 - 8
(E) LB3 - 9
(E) LB3 - 10
(E) LB3 - 14
(E) LB3 - 13
1516
14
(E) LB3 - 16
(E) LB3 - 17
(E) LB3 - 15(E) LB3 - 18,20
(E) LB3 - 19 (E) LB3 - 21,23
(E) LB2 - 3
(E) LB2 - 2,4
(E) LB2 - 1
17
18
19
(EX) (EX)
(EX)
(EX)
(EX)
(EX)
(E) LB2 - 6
(E) LB2 - 5
(E) LB1 - 7
(E) LB1 - 8
(E) LB1 - 9 (E) LB1 - 10
(E) LB1 - 14
(E) LB1 - 13
(E) LB1 - 11
(E) LB1 - 12
(E) LB1 - 16
(E) LB1 - 18
(E) LB1 - 15
(E) LB1 - 17
(E) LB1 - 19
(E) LB1 - 21
(E) LB1 - 23
(E) LB1 - 20
(E) LB1 - 22
(E) LB1 - 24
(E) LB1 - 25
(E) LB1 - 29
(E) LB1 - 31,33
(E) LB1 - 30
(E) LB1 - 35,37
(E) LB1 - 34
(E) LB1 - 38,40
20
20
14
(E) LB1 - 43,45
(E) LB1 - 44,46,48
(E) LB1 - 47,49,51
(E) LB1 - 50,52,54
(E) LB1 - 39
14
22
21
21
23
23
23
23
23
24
(E) LB2 - 7
25
(E) LB2 - 61,63,65
(E) LB2 - 55,57,59
2627
28
29(E) LB1 - 55
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:50
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP101C
ELECTRICALPOWER FLOORPLAN - BLDG 643
Approver
19-0056.001
Author
A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.
B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
C. SEE LAB DRAWINGS AND DETAILS FOR COORDINATION
GENERAL SHEET NOTES
1. TWO COMPARTMENT SURFACE METAL WIREWAY MOUNTED ABOVE BACK SPLASH OF COUNTER. INSTALL DEVICES IN RACEWAY. PROVIDE A 1”C CONCEALED IN WALL FOR POWER, ROUTED UP INSIDE WALL. PROVIDE A 1.25”C FOR DATA WIRING FROM DATA COMPARTMENT, CONCEALED INSIDE WALL, UP INTO ACCESSIBLE CEILING. SEE LAB DRAWINGS. BASIS OF DESIGN: WIREMOLD ALA4800 SERIES ALUMINUM RACEWAY.
2. CONNECT CIRCUITS TO HOOD; FOR INTERNAL RECEPTACLES AND LIGHTS. TWO 120V 20A, EACH 2#12+1#12G. COORDINATE WITH HOOD INSTALLER.
3. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSURE WITH RECEPTACLES. BASIS OF DESIGN TECLAB DOUBLE SIDED DOUBLE PEDASTAL #EP-1313ABAF. PROVIDE (2) GFCI DUPLEX RECEPTACLE(S) ON EACH SIDE. SEE LAB DRAWINGS.
4. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR FOR DATA JACKS. BASIS OF DESIGN TECLAB DOUBLE SIDED SINGLE PEDASTAL #EP-1311ABAF. SEE DATA DRAWINGS FOR CABLING AND JACK REQUIREMENTS; COORDINATE WORK. SEE LAB DRAWINGS.
5. POWER AND DATA WIRING TO ISLAND CASEWORK TO DROP DOWN UTILITY CHASE AND BE ROUTED INSIDE CASEWORK. SEE LAB DRAWINGS.
6. ROUTE POWER AND DATA WIRING DROPS TO FREE STANDING EQUIPMENT IN UTILITY COLUMN; MOUNT RECEPTACLES ON COLUMN. SEE LAB DRAWINGS.
7. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR WITH RECEPTACLES. BASIS OF DESIGN TECLAB SINGLE SIDED PEDASTAL #EP-1312ABAF. PROVIDE (2) GFCI DUPLEX RECEPTACLE(S). SEE LAB DRAWINGS.
8. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR FOR DATA JACKS. BASIS OF DESIGN TECLAB SINGLE SIDED PEDASTAL #EP-1310ABAF. SEE DATA DRAWINGS FOR CABLING AND JACK REQUIREMENTS; COORDINATE WORK. SEE LAB DRAWINGS.
9. INSTALL RECEPTACLE IN LOWER CABINET FOR VACUUM PUMP INSIDE CABINET. CONTROL RECEPTACLE BY SWITCH IN FACE OF CABINET, SEE CASEWORK DRAWINGS. COORDINATE WITH CASEWORK AND HOOD INSTALLER. SEE LAB DRAWINGS.
10. INSTALL DEVICES FLUSH IN SHORT WALL\CHASE BUILT BEHIND CASEWORK. COORDINATE DEVICES AT LAB BENCH WITH LAB DRAWINGS.
11. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 20A NEMA 6-20R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN CHASE WALL; SEE LAB DRAWINGS.
12. POWER DISCONNECT FOR #CH002, FURNACE; MOUNT 60A/2POLE DISCONNECT ON WALL WEST OF CASEWORK AND EXTEND POWER CONCEALED INSIDE WALL TO CHASE BEHIND UNIT ON COUNTER. PROVIDE FLEXIBLE WHIP CONNECTION TO UNIT. 2#8+1#10G. SEE LAB DRAWINGS.
13. GROUND BAR ON WALL, 12”LONG X 2”HGH X 1/4"THICK COPPER ON STANDOFFS. MOUNT HIGH ON WALL; COORDIANTE FINAL MOUNTING HEIGHT. 1#6G BACK TO BLDG MAIN GROUND BUS.
14. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 20A NEMA 6-20R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL; SEE LAB DRAWINGS.
15. RECEPTACLE HIGH ON WALL FOR RO SYSTEM. COORDINATE WITH LAB DRAWINGS.
16. CONNECTION FOR UNDERCOUNTER WASHER. COORDINATE WITH LAB DRAWINGS.
17. IT-CLOSET SPECIAL RECEPTACLE; 208V 20A NEMA 6-20R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL. COORDINATE MOUNTING LOCATION WITH NMSU-IT.
18. COORDINATE MOUNTING LOCATION OF ALL RECEPTACLES IN IT-CLOSET WITH NMSU-IT.; INSTALL IN FLUSH IN WALL.
19. TELECOMM GROUND BUS AND GROUND WIRE BACK TO MAIN GROUND BUS; SEE GROUNDING DIAGRAM ON E601
20. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 20A NEMA L6-30R, 2#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL; SEE LAB DRAWINGS.
21. SPECIAL RECEPTACLE FOR BENCH TOP EQUIPMENT. 208V 3PHASE 20A, 3#10+1#10G. CONFIRM FINAL PLUG CONFIGURATION WITH NMSU. INSTALL IN FLUSH IN WALL; SEE LAB DRAWINGS.
22. POWER DISCONNECT FOR #CH091, UPS; MOUNT 60A/3POLE DISCONNECT ON WALL AND EXTEND POWER TO UNIT. PROVIDE FLEXIBLE WHIP CONNECTION TO UNIT. 3#6+1#10G. SEE LAB DRAWINGS.
23. ALL RECEPTACLES IN ROOM ARE TO BE GFCI TYPE AND INSTALLED IN METAL RACEWAY WHERE RACEWAYS ARE SHOWN ON WALL
24. RECEPTACLE FOR COPIER; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.
25. POWER FOR FIRE ALARM POWER SUPPLY PANEL. COORDINATE WITH SYSTEM INSTALLER.
26. POWER TO ROOFTOP LEF FAN; 208V, 3-PHASE, 60A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL IN MECH RM CM114 ADJACENT TO EXISTING VFD’S, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO FAN ON ROOF. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.
27. POWER TO ROOFTOP PUMP FOR ERU; 208V, 3-PHASE, 30A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL IN MECH RM CM114 ADJACENT TO EXISTING VFD’S, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP ON ROOF. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.
28. SEE ROOF PLAN29. 120V POWER TO MANUALLY CONTROLLED GLYCOL INJECTOR PUMP.
PROVIDE LOCAL MANUAL DISCONNECT. COORDINATE WITH MECHANICAL CONTRACTOR.
SHEET KEYNOTES
NORTH
1/4" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 643
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
J
J
J
J
J
J J
J
J
J
J
J
J
J
JJJ
J
J
J
J
JJ
J
J
J
J
J
JJ
J
J
J
J
J
CHEMISTRY LAB
C106
BV
C105
CLEAN LAB
C105A
GRINDING
C105B
SAMPLE STOR
C103
RECEIPT & DATAENTRY
C101
STOR
CS111
W
CR112
M
CR113
MECH
CM114
ICP-MS
C110
INSTRUMENT RM
C108
WASHING
C102
BALANCE RM
C106B
CHEM & FLAMSTOR
C106A
EQ & STOR
C107
(E) LB3(E) LB4
(E) LB1
VAV-S4.2
VEV4.6VAV-E4.3
VAV-S4.10
VEV-4.20
VAV-S4.9
VEV-4.15
VAV-S4.8
VAV-E4.2
VAV-S4.7VAV-S4.6
VAV-S4.5
VAV-S4.4
VAV.S4.1
1
1
1
1
1
1
1
1
1
11
1
1
1 1
1
1
1
1
11
1
1
1
VEV-4.10VEV-4.9
VEV-4.11
VEV-4.15
VEV-4.14
VEV-4.17
VEV-4.18
VEV-4.19
VEV-4.7
VEV4.6
VEV-4.5
VEV-4.4
VEV-4.3
VEV-4.2
VEV-4.1
VEV-4.20
IT
CT101A
FIRE
C109
1
1
1
1
(E) LB1 -56
(E) LB1 -56
(E) LB1 -56
(E) LB1 -56
(E) LB1 -56
(E) LB1 -56
(E) LB1 -56
(E) LB1 -56
VEV-4.18
(E) LB1 -56
(E) LB2 - 8 (E) LB2 - 8
(E) LB2 - 8
(E) LB2 - 8(E) LB2 - 8
(E) LB2 - 8
(E) LB2 - 8
(E) LB2 - 9
(E) LB2 - 9
VEV-4.20(E) LB2 - 9
(E) LB2 - 9
(E) LB2 - 9
(E) LB2 - 9
(E) LB2 - 9 (E) LB2 - 9
(E) LB2 - 9(E) LB2 - 9
(E) LB2 - 9
(E) LB2
(E) SDP2
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:59
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP102C
ELECTRICALPOWER FLOORPLAN -BLDG 643 -MECH EQUIP
Approver
19-0056.001
Author
A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.
B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
C. SEE LAB DRAWINGS AND DETAILS FOR COORDINATION
GENERAL SHEET NOTES
1. POWER CONNECTION FOR MECHANICAL VAV UNIT. POWER AT 120V TO INTERNAL CONTROL TRANSFORMER PROVIDED WITH VAV. PROVIDE LOCAL SNAP SWITCH AS DISCONNECT MOUNTED WITH-IN 12” OF CONTROL PANEL ON UNIT. COORDINATE WITH MECHANICAL WORK.
2.
SHEET KEYNOTES
NORTH
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
1/4" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 643 - MECHANICAL EQUIPMENT VIEW
CHEMISTRY LAB
C106
INSTRUMENT RM
C108
EQ & STOR
C107
CHEM & FLAMSTOR
C106A
BALANCE RM
C106B
WASHING
C102
RECEIPT & DATAENTRY
C101
BV
C105
CLEAN LAB
C105A
GRINDING
C105BSAMPLE STOR
C103
STOR
CS111
W
CR112
M
CR113
MECH
CM114
ICP-MS
C110
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:30
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EF101C
ELECTRICALTECHNOLOGYFLOOR PLAN -BLDG 643
Approver
19-0056.001
Author
A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.
B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
C. PROVIDE CAT6 COMMUNICATION CABLES TO NEW DATA OUTLETS AND WIRELESS ACCESS POINTS (WAP). SEE SPECIFICATIONS. ALL DATA OUTLETS AND WAP’S SHOWN ON SHEET ARE NEW UNLESS NOTED OTHERWISE. PROVIDE SLACK CABLE AT EACH END OF NEW DATA CABLES: 10FT IN IDF + 12FT IN CEILING AT EACH OUTLET.
D. COMMUNICATION CABLES INSTALLATION: ALL NEW DATA CABLES ARE TO BE RUN CONCEALED; CONCEAL IN CEILINGS; INSTALL IN 1”EMT WHERE EXPOSED. PROVIDE J-HOOK SUPPORT ABOVE CEILINGS.
GENERAL SHEET NOTES
1. NEW\REPLACEMENT FIRE ALARM CONTROL PANEL
SHEET KEYNOTES
1/4" = 1'-0"1 ELECTRICAL FIRE ALARM FLOOR PLAN - BLDG 643
NORTH
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
A. SCOPE OF WORK: INSTALL AN ADDRESSIBLE FIRE ALARM SYSTEM PER THE SPECIFICATIONS AND DRAWINGS. AUDIBLE NOTIFICATION IS HORN BASED. FIRE ALARM SUPERVISION IS REQUIRED FOR FIRE SPRINKLER FLOW.
B. PROVIDE A CODE COMPLIANT, NICET LEVEL III DESIGN TO BE APPROVED BY THE FIRE MARSHAL. PROVIDE DEVICES AS REQUIRED TO MEET ALL NATIONAL AND LOCAL CODE REQUIREMENTS.
C. FIRE ALARM SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL BE IN ACCORDANCE WITH NFPA 70, NFPA 72 AND IFC. SYSTEM IS TO MEET ALL APPLICABLE BUILDING CODES, FIRE CODES AND THE REQUIREMENS OF THE AUTHORITY HAVING JURISDICTION AND INSURANCE CARRIER. VERIFY REQUIREMENS PRIOR TO SHOP DRAWING SUBMITTAL.
D. INFORMATION ON CONTRACT DOCUMENTS IS FOR GENERAL INFORMATION AND BID PURPOSES ONLY. PERFORM REQUIRED CALCULATIONS AND FIELD COORDINATION AND PROVIDE ADDITIONAL DEVICES AS REQUIRED.
E. ADDITIONAL MATERIALS AND LABOR REQUIRED TO SUPPORT CHANGES REQUESTED BY THE AUTHORITY HAVING JURISDICTION SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
F. FLUSH MOUNT ALL NOTIFICATION AND SIGNALING DEVICES TO WALLS. G. DUCT SMOKE DETECTOR, FURNISHED BY DIVISION 28, INSTALLED IN DUCT BY
DIVISION 23, CONNECTED, WIRED AND TESTED BY DIVISION 28. PROVIDE DUCT DETECTORS IN NEW AND EXISTING UNITS WITH AIR MOVEMENT GREATER THAN 2000CFM. INSTALL PER CODE.
H. WHERE APPLICABLE DO NOT INSTALL SMOKE DETECTORS IN A DIRECT AIR FLOW OR CLOSER THAN 3 FEET FROM AN AIR SUPPLY DIFFUSOR OR RETURN AIR OPENING.
I. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.J. INSTALL WALL MOUNTED VISUAL NOTIFICATION DEVICES WITH THEIR BOTTOMS
MOUNTED AT 80”MINIMUM AND 96” MAXIMUM FROM FINISHED FLOOR. K. INSTALL WALL MOUNTED AUDIBLE NOTIFICATION DEVICES WITH THEIR TOPS
MOUNTED AT 90”MINIMUM AND 100” MAXIMUM FROM FINISHED FLOOR AND NO CLOSER THEN 6” TO A HORIZONTAL STRUCTURE.
L. THE CONTRACTOR SHALL ADJUST/INSTALL ALL DEVICES TO MAXIMIZE PERFORMANCE AND TO MINIMIZE FALSE ALARMS.
M. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN CONDUITTHROUGHOUTTHE PROJECT; FIRE ALARM RATED RED MC CABLE IS PERMITTED IN CONCEALED LOCATIONS ONLY. BARE\PLASTIC CABLES INSTALLED IN PLENUM SPACES ARE NOT ACCEPTABLE. ALL RACEWAYS TO BE A MINIMUM SIZE OF 3/4" OR LARGER AS REQUIRED BY THE FIRE ALARM MANUFACTURER.
N. SMOKE DETECTORS SHALL NOT BE ANY CLOSER THAN 1’ FROM FIRE SPRINKLERS.
O. COVER AND PROTECT ALL INSTALLED DEVICES FROM DAMAGE/CONTAMINATION WHILE CONSTRUCTION IS IN PROCESS UNTIL THAT AREA IS READY TO BE TURNED OVER TO THE OWNER.
P. PROVIDE A DEDICATED BRANCH CIRCUIT FOR FIRE ALARM EQUIPMENT. PROVIDE A RED LOCKING DEVICE ON THE BREAKER, TO BLOCK THE HANDLE IN THE “ON” POSITION. LABEL THE CIRCUIT BREAKER AS “FIRE ALARM CIRCUIT CONTROL”. PROVIDE A CIRCUIT ID LABEL ON FIRE PANEL/EXTENDERS. PROVIDE SURGE PROTECTION FOR CIRCUIT TO FIRE ALARM PANEL.
Q. THE INSTALLING CONTRACTOR SHALL PROVIDE A RECORD OF COMPLETION PER NFPA 72, (FIGURE 10.18.2.1.1. 22) CONTROL PANELS, REMOTE ANNUNCIATORS SHALL BE INSTALLED WITH THEIR TOP MOUNTED AT 48”.
R. OWNER SHALL BE RESPONSIBLE FOR ESTABLISHING A FIRE SYSTEM MONITORING CONTRACT OR PROVISIONS.
S. ARCHITECT/ENGINEER AND OWNER SHALL BE NOTIFIED A MINIMUM OF 48 HOURS PRIOR TO THE FINAL INSPECTION AND /OR TESTING.
T. UPON COMPLETION OF THE INSTALLATION OF THE SYSTEMS, A SATISFACTORY TEST OF THE ENTIRE SYSTEM SHALL BE MADE IN ACCORDANCE WITH THE SPECIFICATIONS.
U. SYSTEM DESIGN IS TO INCLUDE THE FOLLOWING MINIMUM REQUIREMENTS IN ADDITION TO ANY SPECIFIC LOCATION NOTED ON FLOOR PLANS.a. SMOKE DETECTION IN ALL CORRIDORS, ELECTRICAL ROOMS,
MECHANCIAL ROOMS, JANITOR CLOSETS, STORAGE ROOMSb. SMOKE DETECTORS AT ALL FIRE ALARM EQUIPMENT LOCATIONSc. FLOW AND TAMPER DEVICES FOR ALL FIRE SUPPRESSION DEVICESd. MONITORING CONNECTION TO FIRE SUPPRESSION SITE POST
INDICATING VALVEe. AUDIBLE AND VISUAL NOTIFICATION DEVICES THROUGHTOUT THE
INSIDE OF THE BUILDINGf. AUDIBLE AND VISUAL NOTIFICATION DEVICES FOR THE EXTERIOR
COURT YARDg. SMOKE DETECTORS IN THE SUPPLY AND RETURNS FOR ALL AIR
HANDLING EQUIPMENT RATED 2,000CFM OR GREATER.
FIRE ALARM GENERAL NOTES
1
OS
PP
?
?
15' - 6 5/8"
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
9' - 0"
10' - 0"
8' - 0"
8' - 0"
9' - 0"
9' - 0"
9' - 0"
15' - 6 3/4"
15' - 7 5/8"
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP22-
FP22-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-FP24-6-
FP24-6-
FP24-6-
FP24-6- FP24-6-
FP24-6- FP24-6-
FP24-6-
FP24-6-FP24-6-FP24-6-FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
15' - 7 3/4"
A22-
A22-
A22-
FP24-6-
FP24-6-
FP24-6-
FP24-6-
V3
V3
2
3
2
3
1
(E) LB3 - 2 (E) LB1 - 2
(E) LB1 -41
(E) LB4 - 1
SW1SW1
SW1
SW1
FP24-6-
C1-C1- C1-
C1-C1-C1-
(E) LB1 - 1
CHEMISTRY LAB
C106
EQ & STOR
C107
CHEM & FLAM
STOR
C106A
BALANCE RM
C106B
INSTRUMENT RM
C108
STOR
CS111
W
CR112
M
CR113
MECH
CM114RECEIPT & DATA
ENTRY
C101
ICP-MS
C110
SAMPLE STOR
C103
BV
C105
CLEAN LAB
C105AGRINDING
C105B
(E) LB3(E) LB4
(E) SDP2
(E) LB1
(E) LB2EMEM
WASHING
C102
IT
CT101A
FIRE
C109
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:30
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EL121C
ELECTRICALLIGHTING FLOORPLAN - BLDG 643
Approver
19-0056.001
Author
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. REPLACE SELECT INTERIOR LIGHT FIXTURES INSIDE BUILDING WITH NEW;
SEE ARCHITECTURAL CEILING PLANS. RETAIN WIRING IN AREA WHERE CEILING IS BEING REINSTALLED. IN AREAS WHERE CEILING IS CHANGING TO OPEN STRUCTURE, REMOVE ALL EXISTING DEVICES, WIRING AND RACEWAYS BACK TO CORRIDOR CEILING AREA, TO ALLOW FOR INSTALLATION OF NEW WIRING SYSTEM. SEE NEW WORK PLANS
C. CONNECT ALL BATTERY POWER EMERGENCY LIGHTS TO UNSWITCHED LEG OF LOCAL LIGHTING CIRCUIT TO CHARGE BATTERIES AND SENSE POWER LOSS TO ILLUMINATE LAMPS.
D. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL CEILING PLANS.
E. PROVIDE NEW LIGHTING CONTROL THROUGHOUT ALL RENOVATED SPACES, REFER TO E-701 SHEETS FOR LIGHTING CONTROL DIAGRAMS.
F. ALL EXTERIOR LIGHTS WALL LIGHTS AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE TO BE CONTROLLED BY NEW CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E701.
G. PROVIDE SUPPORTS AT DIAGONAL CORNERS OF EACH LIGHT FIXTURE IN ALL T-GRIDS. EXTEND SUPPORT UP TO STRUCTURE.
GENERAL SHEET NOTES
1. REPLACE STRIP LIGHTS. MATCH EXISTING HEIGHT. RECONNECT TO EXISTING CIRCUIT.
2. REPLACE EXISTING DOWN LIGHTS IN TOILET ROOMS WITH NEW. RECONNECT TO EXISTING CIRCUIT.
3. REPLACE EXISTING WALL LIGHT OVER MIRROR LIGHT IN TOILET ROOMS WITH NEW. RECONNECT TO EXISTING CIRCUIT.
SHEET KEYNOTES
1/4" = 1'-0"1 ELECTRICAL LIGHTING FLOOR PLAN -- BLDG 643
NORTH
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
C1
LEF
EXISTING AHU-1
1
2
3
WG
(E) LB2 - 10
(E) LB2 - 11
4EQ
C1
EQ
C1
EQ
C1
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:58
:20
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP141C
ELECTRICALPOWER ROOFPLAN - BLDG 643
Approver
19-0056.001
Author
GENERAL SHEET NOTES
1. NEW LAB EXHAUST FAN (LEF). POWER FROM VFD IN MECH ROOM; SEE FLOOR PLAN. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES
2. POWER TO ERU PUMP. POWER FROM VFD IN MECH ROOM; SEE FLOOR PLAN, PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.
3. POWER TO GAS FIRED HUMIDIFIER, 120V 1-PHASE. 2#12 + 1#12G IN 3/4" C. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.
4. PROVIDE WEATHERPROOF, GFCI TYPE POWER RECEPTACLE AT ROOF TOP UNIT. PROVIDE INDEPENDENT SUPPORT FORM UNIT. COORDINATE LOCATION WITH EQUIPMENT INSTALLED. CONSOLIDATE ROOF PENETRATIONS WHERE POSSIBLE AND ROUTE WITH OTHER PENETRATIONS.
5. POWER
SHEET KEYNOTES
1/4" = 1'-0"1 ELECTRICAL POWER ROOF PLAN - BLDG 643
NORTH
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL
EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
C. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, PLUMBING AND ARCHITECTURAL DETAILS.
D. PROVIDE 6” HIGH SUPPORT FOR ALL NEW RACEWAYS OF ROOF.
AREAM
AREAC
AREAN
663
643
330
KEY PLAN
NO
RT
H
.
DN
1 2 3 4 5 7
M
L
K
J
H
G
F
E
D
C
B
A
BAS PANEL
3
EL121N
1
E301N
2
E301N
3
E301N
LP1HP1
HP2 LP2
LP3
LDPMDP TDP
INV1INV2
LAB OFFICES
102
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
VEST
103ACORRIDOR
103
MDF
T111
JAN
J109 M
R107B
W
R107A
VEND
104
U
R105
SEED LAB
110COOL STOR
112B
KIT PREP
112C
OIL/AF
STOR
112D
ELEC
115
DRUM STOR
117
CORRIDOR
101
MAIN LAB
112
ENGINE LAB
112A
MECH/BOILER
M119
DOCK STAGING
121
CENTRAL
RECEIVING
114
PROVER STATION
120
LARGE MASS
118
VESTIBULE
123
STORAGE
118A
ECHELON LEVEL
1 AND 2
116B
MECH
M116
BV
116A
RECEIPT DATA
ENTRY
116
10' - 0"
15' - 1 1/4"
10' - 0"
10' - 0"
9' - 0"9' - 0"
10' - 0"
12' - 9"
10' - 0"
9' - 0"
10' - 0"
A22
B4-6
B4-6
B4-6
B4-6
B4-4
B4-6
B4-6
B4-6
B4-6
B4-6
A22 A22 A22 A22 A22
FP24-6
FP24-6
FP24-6
FP24-6
FP24-6
FP24-6
FP24-6
FP24-6
FP22 FP22
FP22 FP22
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
B4-6
A24
A24
A24
A24
10' - 0"
14' - 0"
12' - 0"
9' - 0" 9' - 0" 9' - 0" 9' - 0"
11' - 4"
15' - 2 3/8"
10' - 0"
10' - 0"
16' - 3 1/2"15' - 10 1/2"
15' - 10 3/8" 14' - 10 1/2"
9' - 0"
9' - 0"
8' - 0"
G8 G8 G8 G12
G8 G8 G8 G12
G8 G8
K24 K24
K24 K24
K24 K24
K24 K24
FP24-6
FP24G
FP24-6
A24
FP24-6FP24-6
FP24-6
FP24-6FP24-6FP24-6
FP24-6 FP24-6
FP24-6 FP24-6
FP24
FP24
B8-15
B8-15
B8-15
B8-15
B4-4
B4-4B4-4B4-4
B4-4 B4-4
EXP1EXP1
B4-4 B4-4
B4-4B4-4
B4-6 B4-6 B4-6 B4-6
B4-6 B4-6
B8-15 B8-15 B8-15 B8-15
B8-15
B8-15
B8-15
B8-15 B8-15 B8-15 B8-15
B8-15 B8-15 B8-15 B8-15
B8-15
B8-15 B8-15B8-15
B8-15
B4-6
B8-15
B8-15 B8-15 B8-15 B8-15
B8-15 B8-15 B8-15 B8-15
B8-15
C1 C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
A22
C1
C1
C1
A22 A22 A22 A22 A22 A22 A22 A22 A22
A22
B8-15
B8-15
B8-15
C1
C1
C1
C1
C1
C1
B4-4
V3
V3
V3
V3
V3C1
B8-15
14
14
1417 (TYP)
14
141414
14
10
1010
11
1
18
14
13
SW18
SW1
8
9
19
12
14
4SW1
8
SW18
SW18
14
16
(TYP)
14
144
14
SW18
1414
1
1411
14
14
14
15
SW2SW1
227
7 SW2
16
(TYP)
14
14
14
14
20
20
19
144
14
11
19
4 2
6
14
21SW2
SW2 SW2
7
7 7
G12
G12
B8-5
B8-5
B8-5
B8-5
B8-5
B8-5
B8-5
B8-5
B8-5
B8-5
MDP - 1
MDP - 2
MDP - 3
MDP - 4
MDP - 5
MDP - 6
MDP - 7
7 SW2 7SW2
1
E301N
2
E301N
3
E301N
EM
EM
EM
X1
EM
EM
EM
X1 X1
X1
X1
X1
EMX1
EM
X1
X1X1
EM
EM
EM
EM
EM
EM
X1
EM
EMX1
EM
EM
X1
EM
EM
EM X1
EM EM
EM
EM
X1
X1
EM
EM EM
EM EM
EM
X1
X1EMEM
X1
X1
X1
12' - 9"
9' - 0"
22 22
2 4 5 7
M
L
K
J
H
G
B8-15 B8-15 B8-15
3
EL121N
5
14
3
6
1
E301N
2
E301N
EMEM
B4-4
B4-4
B4-4
B4-4
B4-4
B4-6 B4-6
NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
NL TOP OF PARAPET
120' - 0"
643 TOP OF S PARAPET
119' - 0"
NL TOP OF RIDGE
129' - 0"
2 3 4 5
B4-6
15
B4-6
N2
RTU
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:37
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EL121N
ELECTRICALLIGHTING FLOORPLAN - BLDG 663
Approver
19-0056.001
Author
GENERAL SHEET NOTES
1. CABLE HANG LIGHT FIXTURES 9’ AFF. COORDINATE HANGING LIGHT FIXTURES WITH FINAL LAYOUT OF MECHANICAL DUCT WORK AND EQUIPMENT.
2. CABLE HANG LIGHT FIXTURES 13’-6" AFF (MATCH BOTTOM OF STEEL). COORDINATE HANGING LIGHT FIXTURES WITH MEZZANINE AND FINAL LAYOUT OF MECHANICAL DUCT WORK AND EQUIPMENT.
3. CABLE HANG LIGHT FIXTURES 9’ ABOVE MEZZANINE. COORDINATE HANGING LIGHT FIXTURES WITH FINAL LAYOUT OF PROVERS AND EQUIPMENT.
4. ROOM LIGHTS ARE MANUALLY CONTROLLED DURING OCCUPIED HOURS AND AUTOMATICALLY CONTROLLED DURING UNOCCUPIED HOURS, SEE E501 FOR LIGHTING CONTROLS.
5. PROVIDE MANUAL OVERRIDE LIGHT SWITCH AT TOP OF STAIR TO MEZZANINE6. SEE MEZZANINE PLAN FOR LIGHT FIXTURES IN TALL SPACE. LIGHTS AT
MEZZANINE ARE TO BE CONTROLLED TOGETHER WITH LIGHTS AT FLOOR LEVEL.
7. MOUNT EXTERIOR LIGHT FIXTURE 15FT ABOVE GRADE. COORDINATE FINAL ELEVATION AND PLACEMENT WITH ARCHITECTURAL ELEVATIONS.
8. MOUNT EXTERIOR LIGHT FIXTURE 9FT ABOVE GRADE. COORDINATE FINAL ELEVATION AND PLACEMENT WITH ARCHITECTURAL ELEVATIONS.
9. SEE SITE PLAN FOR STEP LIGHTS IN AREA.10. COORDINATE LOCATION AND FINAL ELEVATION OF VANITY LIGHT OVER
MIRROR WITH ARCHITECTURAL ELEVATIONS.11. EXTERIOR DOWN LIGHT MOUNTED IN SOFFIT. COORDINATE FINAL POSITION
AND INSTALLATION WITH ARCHITECTURAL DETAILS. 12. EXTERIOR LIGHTING CONTROL TIME CLOCK FOR SITE POLE LIGHTS AND SITE
WALL LIGHTS. TIME CLOCK TO BE NMSU STANDARD. 13. EMERGENCY LIGHTING INVERTER.14. PROVIDE UL924 DEVICE. OVERRIDE LOCAL CONTROL SCHEME TO GO TO FULL
BRIGHT UPON POWER FAILURE. PROVIDE EMERGENCY POWER FROM INVERTER.
15. PROVIDE 3-WAY PILOT-LIGHT WALL SWITCHES FOR MANUAL CONTROL OF LIGHT AT TOP OF LADDER TO ROOF ACCESS. LOCATE AT BOTTOM OF LADDER AND TOP OF LADDER. SEE ELEVATION THIS DRAWING.
16. CABLE HANG LINEAR FIXTURE IN CORRIDOR AT 10FT AFF AND 12” AWAY FROM WALL. COORDINATE FINAL LOCATION AND HEIGHTS WITH ARCHITECTURAL DETAILS.
17. CABLE HANG LINEAR FIXTURE 8’6” AFF. 18. EXPLOSION PROOF CLASS-1 DIV-1 LIGHT FIXTURE IN DRUM STORAGE.19. PROVIDE WEATHERPROOF LIGHT SWITCH ON EXTERIOR WALL OUTSIDE OF
DRUM STORAGE.20. PROVIDE LOCAL WALL SWITCH AT COUNTER TO CONTROL STRIP LIGHT
ABOVE COUNTER.21. CABLE HANG LIGHT FIXTURES 8’ AFF AT COUNTER TO PROVIDE LOCAL TASK
LIGHT. COORDINATE HANGING LIGHT FIXTURES WITH FINAL LAYOUT OF CASEWORK AND EQUIPMENT.
22. MOUNT EXTERIOR LIGHT FIXTURE 8FT ABOVE GRADE. COORDINATE FINAL ELEVATION AND PLACEMENT WITH ARCHITECTURAL ELEVATIONS
SHEET KEYNOTES
NORTH
1/8" = 1'-0"1 ELECTRICAL LIGHTING FLOOR PLAN - BLDG 6631/8" = 1'-0"2 ELECTRICAL LIGHTING MEZZANINE
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001B. CONNECT ALL BATTERY POWER EMERGENCY LIGHTS TO UNSWITCHED LEG
OF LOCAL LIGHTING CIRCUIT TO CHARGE BATTERIES AND SENSE POWER LOSS TO ILLUMINATE LAMPS.
C. CONNECT ALL LUMINAIRES WITHIN DASHED BOUNDARIES TO CIRCUIT INDICATED.
D. COORDINATE FINAL LOCATION AND CEILING TYPES WITH ARCHITECTURAL CEILING PLANS.
E. ALL EXTERIOR LIGHTS (POLE LIGHTS + WALL LIGHTS) AND INTERIOR COMMON SPACE & CORRIDOR\CONCOURSE LIGHTS ARE CONTROLLED BY CENTRAL LIGHTING CONTROL PANELS. SEE DETAIL ON E500 SHEETS.
F. REFER TO E-501 FOR LIGHTING CONTROL SCHEDULE AND DIAGRAMS.G. REFER TO E-701 FOR LIGHT FIXTURE SCHEDULE.
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
NOT TO SCALE3 Section 77
.
DN
JJ J J J J J J
J
J
J J
J
J
J
JJ
J
JJ
1 2 3 4 5 7
M
L
K
J
H
G
F
E
D
C
B
A
LAB OFFICES
102
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
CORRIDOR
103
VEST
103A
MDF
T111
JAN
J109
M
R107B
W
R107A
VEND
104
U
R105
SEED LAB
110
COOL STOR
112B
KIT PREP
112C
ELEC
115
OIL/AFSTOR
112D
DRUM STOR
117
ENGINE LAB
112AMAIN LAB
112
MECH/BOILER
M119
CORRIDOR
101
DOCK STAGING
121
VESTIBULE
123STORAGE
118A
ECHELON LEVEL1 AND 2
116B
BV
116A
MECH
M116
RECEIPT DATAENTRY
116
LARGE MASS
118
PROVER STATION
120
HP2 LP2
TDPMDP LDP
LP3
CENTRALRECEIVING
114
N2
BP
N1
ET
N2
CHWP
N1
CHWP
N1
HHWP
N2
HHWPN1
ERP
3
EL121N
LP1HP1
E401N1
9
9
99
13
9
9
932
99
99
9
4
1
23
7 8
7 8 7 8 7 8
10
11
15
14
16 16
17
20
21
(TYP)
(TYP)
1919
20
21(TYP)
(TYP)
1
1 LDP - 11
1
4
2
2
4
2
2
3
3
3
3
3
LDP - 3
4 4
4
LDP - 4
LDP - 5
6
6
6
6
LDP - 6
LDP - 2
7 7 7
7 7 7
7
WG
AC AC6
LDP - 8,10,12LDP - 9,11,13 LDP - 14,16,18 LDP - 15,17,19
LDP - 20LDP - 21
LDP - 22LDP - 23
LDP - 24
24
24
LDP - 26
LDP - 25
24
LDP - 36
36 36
36
22
LDP - 37
LDP37
WG
1
E301N
2
E301N
3
E301N
WG
LP2 - 5
LP1 - 2 23
24
24
23
25 25
26
27
LP2 - 6,8
LP1 - 3,523
25
HP2 - 26,28,30
HP2 - 27,29,31
LP3 - 3
LP3 - 1
AC
AC
AC
AC
AC,G
AC,G
AC,G
AC,G
AC
AC
AC
LP1 - 8
LP1 - 10
LP1 - 7
LP1 - 4
LP1 - 6
4
6
8
10
LP1 - 13LP1 - 12
LP1 - 14
119
9
LP1 - 9LP1 - 11
LP1 - 15
15 15 LP1 - 1616
16
16
HP1 - 1,3,5
LP1 - 19LP1 - 18
LP1 - 17
G
G
LP1 - 20
20
20
22
LP1 - 22
22 22
LP1 - 2121
21
21LP1 - 24
LP1 - 23
LP1 - 25
28
28
29
30
+48"
+48"LP1 - 26
LP1 - 27
LP1 - 28
LP1 - 29
28
WG
GGG
G
AC,G
LP1 - 33
33
33
LP1 - 3434 34 34
LP1 - 42
12 12
13
13
N1
BP
LP2 - 14
14
14
14
WG
LDP - 39
WG
LP1 - 42WG
LP3 - 27,29 LP3 - 28,30
LP3 - 12 LP3 - 13 LP3 - 14 LP3 - 15 LP3 - 16 LP3 - 17
LP3 - 18
LP3 - 19 LP3 - 20 LP3 - 21 LP3 - 22
LP3 - 23
LP3 - 24
LP3 - 11LP3 - 10
LP3 - 9
LP3 - 25
25 25
LP3 - 26
(TYP)
AC
AC
AC
AC AC
6
6
28
31
31
31
LP3 - 7
LP3 - 5
LP3 - 6
LP3 - 4
LP3 - 37 32LP3 - 50
LP3 - 36
LP3 - 48
LP3 - 39
LP3 - 40
LP3 - 41
43
43
4343
LP3 - 42
LP3 - 38
LP3 - 44
LP3 - 45
LP3 - 46
32
43
33
33
34
34LDP - 40
33
LDP - 41
35
34
LP3 - 31 LP3 - 32 LP3 - 33 LP3 - 34
LP3 - 35
36(TYP)
36(TYP)
37
LDP - 42LDP - 43
38
38
LDP - 46
LDP - 45
LDP - 44
AC,G
AC,G
AC,G
GG G
12
39
LP2 - 10
LP1 - 42
LP2 - 13
LP2 - 12
13
LDP - 49
38
INV2 INV1
MDP - 10LDP - 50
40
18
41
AC,G
AC,G
AC,G36 G 36 G
LP1 - 36
9
2 4 5 7
M
L
K
1
E301N
2
E301N
LP1 - 35
G G
28
1. RECEPTACLE FOR MICROWAVE IN HIGH CABINET; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.
2. RECEPTACLE FOR REFRIGERATOR. MOUNT 42" AFF BEHIND UNIT. SEE ARCHTECTURAL DETAILS.
3. RECEPTACLE FOR COPIER; COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH ARCHITECTURAL DETAILS.
4. RECEPTACLE FOR WATER FOUNTAIN. COORDINATE FINAL LOCATION WITH FOUNTAIN INSTALLER. PROVIDE GFCI TYPE BREAKER IN PANEL.
5. WALL MOUNTED 20AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-20R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.
6. WALL MOUNTED 30AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-30R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.
7. NEW FLOOR BOX WITH POWER CONNECTION TO FURNITURE, 6" DIAMETER TYPE FLR BOX FLUSH IN FLR. COORDINATE EXACT LOCATION WITH ARCHITECT. ON GRADE, HINGED DIE-CAST ROUND ALUMINUM COVER WITH FURNITURE WHIP HOLE DOORS; BLACK FINISH COVER; INTERNAL DIVIDER; BASIS OF DESIGN WIREMOLD MODEL ##. BRANCH CIRCUIT FOR PWR 3/4”C WITH 9#12+1#12G ROUTED CONCEALED UNDER FLOOR, AND STUB UP INTO WALL TO GET TO CEILING, THEN EXTENDED TO POWER PANEL. CONNECT FLEXIBLE WHIP FURNISHED WITH THE FURNITURE. COORDINATE ACTUAL LOCATION WITH FURNITURE PROVIDER.
8. FLOOR BOX FOR DATA; FLUSH IN FLOOR. COORDINATE EXACT LOCATION WITH ARCHITECT. RECESSED CABLE CONNECTIONS; ON-GRADE METAL ASSEMBLY; HINGED DIE-CAST ALUMINUM COVER WITH CABLE DOORS; DUST GASKET; BLACK FINISH COVER; NO POWER PROVISIONS; BRACKETS FOR MULTIPLE DATA JACKS; COORDINATE AND PROVIDE DEVICE PLATES FOR CENTER DEVICES AND FOR SIDE MOUNT DEVICES. BASIS OF DESIGN WIREMOLD MODEL 8ATCBK. COORDINATE FINIAL COVER PLATE FINISH COLOR WITH COR. PROVIDE TWO 1.25"C FOR COMMUNICATION CABLES. EXTEND TWO 1.25”C FROM BOX, UP INTO CEILING. COORDINATE WORK WITH TECHNOLOGY DRAWINGS.
9. TWO COMPARTMENT SURFACE METAL WIREWAY MOUNTED ABOVE BACK SPLASH OF COUNTER. INSTALL DEVICES IN RACEWAY. PROVIDE A 1”C CONCEALED IN WALL FOR POWER, ROUTED UP INSIDE WALL. PROVIDE A 1.25”C FOR DATA WIRING FROM DATA COMPARTMENT, CONCEALED INSIDE WALL, UP INTO ACCESSIBLE CEILING. SEE LAB DRAWINGS. BASIS OF DESIGN: WIREMOLD ALA4800 SERIES ALUMINUM RACEWAY.
10. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#1. PROVIDE A DEDICATED 120V 20A RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A RECEPTACLE ON THE CEILING IN RM 116B; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON CEILING IN ROOM 116A. SEE ADDITIONAL NOTES FOR CORD REEL.
11. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#2. PROVIDE A DEDICATED 120V 30A, NEMA L5-30P (CONFIRM FINAL RECEPTACLE TYPE WITH NMDA); RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A RECEPTACLE ON THE CEILING IN RM 116B; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON CEILING IN ROOM 116A. SEE ADDITIONAL NOTES FOR CORD REEL.
12. ECEPTACLE FOR VENDING MACHINES. MOUNT AT 42” AFF. PROVIDE GFCI BREAKER; SEE PANEL SCHEDULE.
13. PROVIDE NEW SURFACE MOUNTED RECEPTACLE ON CEILING AND RETRACTABLE CORD REEL HUNG FROM CEILING. CORD REEL TO BE INDUSTRIAL RETRACTABLE 20FT EXTENSION CORD IN METAL REEL WITH FOUR 5-20R GROUNDED OUTLETS ALERT STAMPING ITEM #5020TF-4C OR EQUAL. PROVIDE ADJACENT CEILING MOUNTED EYE-BOLT AND SWAGED 1/8” STRANDED STEEL SAFETY CABLE THROUGH REEL YOKE WITH CARABINEER CLIP AS SECONDARY FALL PROTECTION.
14. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#3. PROVIDE A DEDICATED 120V 20A RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A SURFACE MOUNTED RECEPTACLE ON THE SIDE OF THE COMPARATOR CONCRETE BASE; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON SIDE OF BASE. COORDINATE WITH LAB DRAWINGS AND ARCHITECTURAL DETAILS..
15. LOCATION OF NMDA FURNISHED, PLUG-IN LOCAL UPS#4. PROVIDE A DEDICATED 120V 20A RECEPTACLE ON WALL TO POWER UPS. PROVIDE A POWER EXTENSION FROM THE UPS TO A SURFACE MOUNTED RECEPTACLE ON THE SIDE OF THE COMPARATOR CONCRETE BASE; PROVIDE 48” SOJ CORD 2#12+1#12G + NEMA 5-15P, FROM A J-BOX ON WALL; PROVIDE 2#12+1#12G FROM J-BOX TO A STANDARD SIMPLEX RECEPTACLE ON SIDE OF BASE. COORDINATE WITH LAB DRAWINGS AND ARCHITECTURAL DETAILS..
16. SURFACE MOUNTED RECEPTACLE ON THE SIDE OF THE COMPARATOR CONCRETE BASE; EXTEND POWER FROM REMOTE UPS. SEE ADDITIONAL NOTES. SEE LAB DRAWINGS.
17. POWER TO OVERHEAD BRIDGE CRANE. PROVIDE DISCONNECT ON WALL AND POWER CONNECTION TO CRANE. COORDINATE WITH CRANE INSTALLER.
18. INVERTER FOR EMERGENCY LIGHTING, SEE LIGHTING PLAN.19. CONNECT CIRCUITS TO HOOD; FOR INTERNAL RECEPTACLES AND LIGHTS. TWO
120V 20A, EACH 2#12+1#12G. COORDINATE WITH HOOD INSTALLER.20. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR WITH
RECEPTACLES. BASIS OF DESIGN TECLAB DOUBLE SIDED DOUBLE PEDASTAL #EP-1313ABAF. PROVIDE (2) GFCI DUPLEX RECEPTACLE(S) ON EACH SIDE. SEE LAB DRAWINGS.
21. COUNTERTOP MOUNTED VERTICAL PEDASTAL STYLE TYPE ENCLOSUR FOR DATA JACKS. BASIS OF DESIGN TECLAB DOUBLE SIDED SINGLE PEDASTAL #EP-1311ABAF. SEE DATA DRAWINGS FOR CABLING AND JACK REQUIREMENTS; COORDINATE WORK. SEE LAB DRAWINGS.
22. POWER FOR IRRIGATION CONTROL. COORDINATE FINAL LOCATION WITH IRRIGATION DRAWINGS. PROVIDE 2”C FROM CONTROLLER TO SITE HAND-HOLE; SEE SITE PLAN.
23. CONTROLS FOR ROLL-UP DOOR. PROVIDE FLUSH BACKBOX WITH CONDUIT AND WIRES TO DOOR MOTOR. COORDINATE FINAL LOCATION WITH NMSU. COORDINATE WITH DOOR INSTALLER.
24. OUTDOOR KEY OPERATED CONTROL STATION FOR ROLL-UP DOOR. PROVIDE FLUSH BACKBOX WITH CONDUIT AND WIRES TO DOOR MOTOR. COORDINATE FINAL LOCATION WITH NMSU. COORDINATE WITH DOOR INSTALLER.
25. POWER TO ROLL-UP DOOR. PROVIDE LOCATION 120V/1POLE 30A DISCONNECT SWITCH ADJACENT TO DOOR OPERATOR. SUPPORT DISCONNECT INDEPENDENTLY FROM DOOR. PROVIDE FLEX CONNECTION TO MOTOR. COORDINATE WITH DOOR INSTALLER.
26. CONTROLS FOR DOCK-LEVELER. PROVIDE FLUSH BACKBOX WITH CONDUIT AND WIRES TO CONTROLLER UNDER DOCK-LEVELER. COORDINATE FINAL LOCATION OF CONTROLS WITH NMSU. COORDINATE WITH DOCK-LEVELER INSTALLER.
27. POWER TO DOCK-LEVELER. PROVIDE LOCATION 208V/2POLE 30A DISCONNECT SWITCH ON WALL INSIDE VESTIBULE. PROVIDE 2#12+1#12G IN CONDUIT FROM DISCONNECT TO CONTROL UNIT UNDER LEVELER; PROVIDE LFMC FLEX CONNECTIONS TO MOTOR. COORDINATE WITH DOCK-LEVELER INSTALLER.
28. MOUNT ALL RECEPTACLES IN ROOM AT 36”AFF UNO.29. PALLET JACK CHARGING STATION. PROVIDE A DEDICATED 120V 30A, NEMA
L5-30P (CONFIRM FINAL RECEPTACLE TYPE WITH NMDA). SEE LAB DRAWINGS. 30. PALLET JACK CHARGING STATIONS. PROVIDE A DEDICATED 120V 20A. SEE LAB
DRAWINGS. 31. ALL RECEPTACLES IN ROOM ARE TO BE GFCI TYPE AND INSTALLED IN METAL
RACEWAY WHERE RACEWAYS ARE SHOWN ON WALL32. INSTALL RECEPTACLE IN LOWER CABINET FOR VACUUM PUMP INSIDE CABINET.
CONTROL RECEPTACLE BY SWITCH IN FACE OF CABINET, SEE CASEWORK DRAWINGS. COORDINATE WITH CASEWORK AND HOOD INSTALLER. SEE LAB DRAWINGS.
33. POWER CONNECTION FOR MOTORIZED DOOR OPENERS. PROVIDE CONTROL WIRING AND CONDUITS, SEE ET DRAWINGS FOR ADDITIONAL WORK. COORDINATE FINAL REQUIREMENTS WITH DOOR INSTALLER.
34. WALL MOUNTED PUSH BUTTON FOR MOTORIZED DOOR OPENER. PROVIDE CONDUIT UP INTO ACCESSIBLE CEILING, EXTEND TO DOOR CONTROLLER. SEE DETAILS. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
35. PUSH BUTTON FOR MOTORIZED DOOR OPENER, MOUNTED ON PEDASTAL. PROVIDE 1"C FROM PEDESTAL UNDER SLAB AND UP INTO CEILING CAVITY OF VESTIBULE, EXTEND TO DOOR CONTROLLER. SEE DETAILS. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
36. RECEPTACLE IN KNEE SPACE UNDER COUNTER, SEE LAB DRAWINGS.37. GROUND BAR ON WALL, 12”LONG X 2”HGH X 1/4"THICK COPPER ON STANDOFFS.
MOUNT ON WALL ABOVE TOP OF DRUMS; COORDIANTE FINAL MOUNTING HEIGHT. 1#6G BACK TO BLDG MAIN GROUND BUS.
38. POWER FOR ELECTRIC HAND DRYER. PROVIDE RECESSED BACK BOX AND FINAL CONNECTION; COORDINATE HEIGHT.
39. GROUND BAR ON WALL, 12”LONG X 2”HGH X 1/4"THICK COPPER ON STANDOFFS. MOUNT HIGH ON WALL ABOVE TOP OF TALL SHELVES; COORDIANTE FINAL MOUNTING HEIGHT. 1#6G BACK TO BLDG MAIN GROUND BUS.
40. EMERGENCY POWER INVERTER FOR DRUM STORAGE EXHAUST FAN. 2#10+1#10G.
41. EXHAUST FAN FOR DRUM STORAGE TO BE POWERED BY INVERTER INV2 TO PROVIDE EMERGENCY OPERATION OF FAN. EXTEND POWER BACK TO INV2 IN ELEC ROOM 115; PROVIDE 120V/30A/1POLE DISCONNECT ON WALL ABOVE INV2 TO CONTROL EF. COORDINATE WITH MECHANICAL CONTRACTOR.
SHEET KEYNOTES
NORTH
1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 6631/8" = 1'-0"2 ELECTRICAL POWER MEZZANINE
A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.
B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
C. SEE LAB DRAWINGS AND DETAILS FOR COORDINATIOND. SEE TECHNOLOGY DRAWINGS AND DETAILS FOR COORDINATION
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
(TYP)
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:57
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP101N
ELECTRICALPOWER FLOORPLAN - BLDG 663
Approver
19-0056.001
Author
GENERAL SHEET NOTES
.
DN
J
J
J
J
J
J
J
J
J
J
J
J
JJ
J
J J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
1 2 3 4 5 7
M
L
K
J
H
G
F
E
D
C
B
A
LAB OFFICES
102
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
CORRIDOR
103
VEST
103A
MDF
T111
JAN
J109
M
R107B
W
R107A
VEND
104
U
R105
SEED LAB
110
COOL STOR
112B
KIT PREP
112C
ELEC
115 OIL/AFSTOR
112D
DRUM STOR
117
ENGINE LAB
112AMAIN LAB
112
MECH/BOILER
M119
CORRIDOR
101
DOCK STAGING
121
VESTIBULE
123STORAGE
118A
ECHELON LEVEL1 AND 2
116B
BV
116A
MECH
M116
RECEIPT DATAENTRY
116
LARGE MASS
118
PROVER STATION
120
HP2 LP2
TDPMDP LDP
LP3
CENTRALRECEIVING
114
LP1HP1
VAV-S1.4
VAV-S1.5
VAV-S1.1
VAV-S1.3
VAV-R1.4
VAV-R1.5
VAV-R1.2
VAV-S2.2VAV-S2.1
VAV-R1.3
VAV-S1.2
FCU-1.10
VAV-S2.3
VAV-S2.6
VAV-E1.5
VAV-S2.4
VAV-E2.4
VEV-2.2
VAV-E2.7a
VAV-E2.7b
VAV-S2.7
VAV-S2.6
VAV-E3.3
VAV-S3.5
VAV-S3.2
VAV-S3.3
VAV-S3.4
HP1 - 2
1
HP1 - 2
1
HP1 - 2
1
HP2 - 32
11
HP2 - 32
1
HP2 - 32
1
1
HP2 - 32
HP2 - 32
HP2 - 32
HP2 - 331HP2 - 33
1
HP2 - 331
HP2 - 331HP2 - 33
1
MDP - 81
MDP - 81 MDP - 81
MDP - 8
1
MDP - 8
1
MDP - 8
1
MDP - 8
1
MDP - 8
1MDP - 8
1
MDP - 9
1
MDP - 9
1
MDP - 9
1
MDP - 9
1
LDP - 47
2
LDP - 47
2
LP3 - 56
2
LP2 - 15
2
LP2 - 16
2LP2 - 16
2
LP1 - 44
2
FCU-1.3
FCU-1.1
LP1 - 50,52
LP1 - 45,47
LP1 - 46,48
LP1 - 49,51
3
3
3
3
HG-1.10
HG-1.5
HG-1.1
HG-1.3
HG-1.4
VAV-S3.1
MDP - 9
1
FCU-1.6
FCU-1.5
LP1 - 39,41
3
VAV-R1.1
VAV-E1.1
HP1 - 2
1
HP1 - 2
HP1 - 21
1
FCU-1.2
VAV-E2.5a
VAV-E2.5b
1
1
MDP - 8
MDP - 8
MDP - 9
1INV1INV2
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:27
:02
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP102N
ELECTRICALPOWER FLOORPLAN -BLDG 663 -MECH EQUIP
Approver
19-0056.001
Author
NORTH
1/8" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN - BLDG 663 - MECHANICAL EQUIPMENT VIEW
GENERAL SHEET NOTES
1. POWER CONNECTION FOR MECHANICAL VAV UNIT. POWER AT 277V TO INTERNAL CONTROL TRANSFORMER PROVIDED WITH VAV. PROVIDE LOCAL SNAP SWITCH AS DISCONNECT MOUNTED WITH-IN 12” OF CONTROL PANEL ON UNIT. COORDINATE WITH MECHANICAL WORK.
2. POWER CONNECTION FOR MECHANICAL FCU UNIT. POWER AT 120V. PROVIDE LOCAL SNAP SWITCH AS DISCONNECT MOUNTED ON UNIT. COORDINATE WITH MECHANICAL WORK.
3. POWER CONNECTION TO ELECTRIC HUMIDIFIER. SEE MECHANICAL DRAWINGS. POWER AT 208V 1-PHASE. INSTALL DISCONNECT ON WALL AND PROVIDE FINAL CONNECTION TO UNIT.
SHEET KEYNOTES
A. COORDINATE FINAL LOCATION OF ALL EQUIPMENT WITH MECHANICAL AND PLUMBING CONTRACTORS.
B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
.
DN
1 2 3 4 5 7
M
L
K
J
H
G
F
E
D
C
B
A
LAB OFFICES
102
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
CORRIDOR
103VEST
103A
MDF
T111
JAN
J109
M
R107B
W
R107A
U
R105
VEND
104
ELEC
115
DRUM STOR
117
KIT PREP
112C
COOL STOR
112B
SEED LAB
110
OIL/AFSTOR
112D
ENGINE LAB
112A
MAIN LAB
112
DOCK STAGING
121
MECH/BOILER
M119
CENTRALRECEIVING
114
PROVER STATION
120
LARGE MASS
118
VESTIBULE
123 STORAGE
118A
ECHELON LEVEL1 AND 2
116B
BV
116A
RECEIPT DATAENTRY
116
MECH
M116
CORRIDOR
101
BAS PANEL
1
E301N
2
E301N
3
E301N
2 4 5 7
M
L
K
1
E301N
2
E301N
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:33
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EF101N
ELECTRICALTECHNOLOGYFLOOR PLAN -BLDG 663
Approver
19-0056.001
Author
A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS.
GENERAL SHEET NOTES
1. FIRE ALARM CONTROL PANEL2. FIRE ALARM REMOTE ANNUNCIATOR
SHEET KEYNOTES
NORTH
1/8" = 1'-0"1 ELECTRICAL FIRE ALARM FLOOR PLAN - BLDG 6631/8" = 1'-0"2 ELECTRICAL TECHNOLOGY MEZZANINE
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
A. SCOPE OF WORK: INSTALL AN ADDRESSIBLE FIRE ALARM SYSTEM PER THE SPECIFICATIONS AND DRAWINGS. AUDIBLE NOTIFICATION IS HORN BASED. FIRE ALARM SUPERVISION IS REQUIRED FOR FIRE SPRINKLER FLOW.
B. PROVIDE A CODE COMPLIANT, NICET LEVEL III DESIGN TO BE APPROVED BY THE FIRE MARSHAL. PROVIDE DEVICES AS REQUIRED TO MEET ALL NATIONAL AND LOCAL CODE REQUIREMENTS.
C. FIRE ALARM SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL BE IN ACCORDANCE WITH NFPA 70, NFPA 72 AND IFC. SYSTEM IS TO MEET ALL APPLICABLE BUILDING CODES, FIRE CODES AND THE REQUIREMENS OF THE AUTHORITY HAVING JURISDICTION AND INSURANCE CARRIER. VERIFY REQUIREMENS PRIOR TO SHOP DRAWING SUBMITTAL.
D. INFORMATION ON CONTRACT DOCUMENTS IS FOR GENERAL INFORMATION AND BID PURPOSES ONLY. PERFORM REQUIRED CALCULATIONS AND FIELD COORDINATION AND PROVIDE ADDITIONAL DEVICES AS REQUIRED.
E. ADDITIONAL MATERIALS AND LABOR REQUIRED TO SUPPORT CHANGES REQUESTED BY THE AUTHORITY HAVING JURISDICTION SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
F. FLUSH MOUNT ALL NOTIFICATION AND SIGNALING DEVICES TO WALLS. G. DUCT SMOKE DETECTOR, FURNISHED BY DIVISION 28, INSTALLED IN DUCT BY
DIVISION 23, CONNECTED, WIRED AND TESTED BY DIVISION 28. PROVIDE DUCT DETECTORS IN NEW AND EXISTING UNITS WITH AIR MOVEMENT GREATER THAN 2000CFM. INSTALL PER CODE.
H. WHERE APPLICABLE DO NOT INSTALL SMOKE DETECTORS IN A DIRECT AIR FLOW OR CLOSER THAN 3 FEET FROM AN AIR SUPPLY DIFFUSOR OR RETURN AIR OPENING.
I. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.J. INSTALL WALL MOUNTED VISUAL NOTIFICATION DEVICES WITH THEIR BOTTOMS
MOUNTED AT 80”MINIMUM AND 96” MAXIMUM FROM FINISHED FLOOR. K. INSTALL WALL MOUNTED AUDIBLE NOTIFICATION DEVICES WITH THEIR TOPS
MOUNTED AT 90”MINIMUM AND 100” MAXIMUM FROM FINISHED FLOOR AND NO CLOSER THEN 6” TO A HORIZONTAL STRUCTURE.
L. THE CONTRACTOR SHALL ADJUST/INSTALL ALL DEVICES TO MAXIMIZE PERFORMANCE AND TO MINIMIZE FALSE ALARMS.
M. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN CONDUITTHROUGHOUTTHE PROJECT; FIRE ALARM RATED RED MC CABLE IS PERMITTED IN CONCEALED LOCATIONS ONLY. BARE\PLASTIC CABLES INSTALLED IN PLENUM SPACES ARE NOT ACCEPTABLE. ALL RACEWAYS TO BE A MINIMUM SIZE OF 3/4" OR LARGER AS REQUIRED BY THE FIRE ALARM MANUFACTURER.
N. SMOKE DETECTORS SHALL NOT BE ANY CLOSER THAN 1’ FROM FIRE SPRINKLERS.
O. COVER AND PROTECT ALL INSTALLED DEVICES FROM DAMAGE/CONTAMINATION WHILE CONSTRUCTION IS IN PROCESS UNTIL THAT AREA IS READY TO BE TURNED OVER TO THE OWNER.
P. PROVIDE A DEDICATED BRANCH CIRCUIT FOR FIRE ALARM EQUIPMENT. PROVIDE A RED LOCKING DEVICE ON THE BREAKER, TO BLOCK THE HANDLE IN THE “ON” POSITION. LABEL THE CIRCUIT BREAKER AS “FIRE ALARM CIRCUIT CONTROL”. PROVIDE A CIRCUIT ID LABEL ON FIRE PANEL/EXTENDERS. PROVIDE SURGE PROTECTION FOR CIRCUIT TO FIRE ALARM PANEL.
Q. THE INSTALLING CONTRACTOR SHALL PROVIDE A RECORD OF COMPLETION PER NFPA 72, (FIGURE 10.18.2.1.1. 22) CONTROL PANELS, REMOTE ANNUNCIATORS SHALL BE INSTALLED WITH THEIR TOP MOUNTED AT 48”.
R. OWNER SHALL BE RESPONSIBLE FOR ESTABLISHING A FIRE SYSTEM MONITORING CONTRACT OR PROVISIONS.
S. ARCHITECT/ENGINEER AND OWNER SHALL BE NOTIFIED A MINIMUM OF 48 HOURS PRIOR TO THE FINAL INSPECTION AND /OR TESTING.
T. UPON COMPLETION OF THE INSTALLATION OF THE SYSTEMS, A SATISFACTORY TEST OF THE ENTIRE SYSTEM SHALL BE MADE IN ACCORDANCE WITH THE SPECIFICATIONS.
U. SYSTEM DESIGN IS TO INCLUDE THE FOLLOWING MINIMUM REQUIREMENTS IN ADDITION TO ANY SPECIFIC LOCATION NOTED ON FLOOR PLANS.a. SMOKE DETECTION IN ALL CORRIDORS, ELECTRICAL ROOMS,
MECHANCIAL ROOMS, JANITOR CLOSETS, STORAGE ROOMSb. SMOKE DETECTORS AT ALL FIRE ALARM EQUIPMENT LOCATIONSc. FLOW AND TAMPER DEVICES FOR ALL FIRE SUPPRESSION DEVICESd. MONITORING CONNECTION TO FIRE SUPPRESSION SITE POST
INDICATING VALVEe. AUDIBLE AND VISUAL NOTIFICATION DEVICES THROUGHTOUT THE
INSIDE OF THE BUILDINGf. AUDIBLE AND VISUAL NOTIFICATION DEVICES FOR THE EXTERIOR
COURT YARDg. SMOKE DETECTORS IN THE SUPPLY AND RETURNS FOR ALL AIR
HANDLING EQUIPMENT RATED 2,000CFM OR GREATER.
FIRE ALARM GENERAL NOTES
1
2
1 2 3 4 5 7
M
L
K
J
H
G
F
E
D
C
B
A
N2
RTU
N3
RTU
3
EL121N
N1
RTU
2
2
1
2
MDP - 38,40,42
MDP - 44,46,48
MDP - 32,34,36
MDP - 37,39,41
1
E301N
2
E301N
3
E301N
LDP - 38 WG
WGLDP38
LP1 - 1
WG
LP1
1
WG
4
4
4
4
N2
HG
N3
HG
5LDP - 51
EQ
N1
5LDP - 52
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTIO
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:52
:42
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
EP141N
ELECTRICALPOWER ROOFPLAN - BLDG 663
Approver
19-0056.001
Author
A. SEE PROJECT GENERAL ELECTRICAL NOTES ON E001.B. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR
MECHANICAL EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
C. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, PLUMBING AND ARCHITECTURAL DETAILS.
D. PROVIDE 6” HIGH SUPPORT FOR ALL NEW RACEWAYS OF ROOF.
GENERAL SHEET NOTES
1. NEW LAB EXHAUST FAN (LEF). 480V 3-PHASE. 3#12 + 1#12G IN 3/4" C UNO. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.
2. POWER TO RTU, 480V 3-PHASE. 3#8 + 1#10G IN 3/4" C UNO. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.
3. POWER TO ERU, 480V 3-PHASE. 3#8 + 1#10G IN 3/4" C UNO. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.
4. PROVIDE WEATHERPROOF, GFCI TYPE POWER RECEPTACLE AT ROOF TOP UNIT. PROVIDE INDEPENDENT SUPPORT FORM UNIT. COORDINATE LOCATION WITH EQUIPMENT INSTALLED. CONSOLIDATE ROOF PENETRATIONS WHERE POSSIBLE AND ROUTE WITH OTHER PENETRATIONS.
5. POWER TO GAS FIRED HUMIDIFIER, 120V 1-PHASE. 2#12 + 1#12G IN 3/4" C. PROVIDE LOCAL 30A/3P; NEMA 3R DISCONNECT; PROVIDE INDEPENDENT SUPPORT FOR DISCONNECT FROM ROOF. AVOID ANY DIRECT HARD CONNECTION TO VIBRATING UNIT; PROVIDE LFMC CONDUIT CONNECTION TO UNIT. COORDINATE LOCATION WITH OTHER TRADES.
SHEET KEYNOTES
NORTH
1/8" = 1'-0"1 ELECTRICAL POWER ROOF PLAN - BLDG 663
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
ALTERNATE #7
ALTERNATE #7
NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
643 TOP OF S PARAPET
119' - 0"
643 TOP OF N PARAPET
120' - 6"
NL TOP OF RIDGE
129' - 0"
MLK
RECEIPT DATAENTRY
116
PROVER STATION
120 NEW LAB LEVEL 1
100' - 0"
NL MEZZANINE
113' - 6"
643 TOP OF S PARAPET
119' - 0"
643 TOP OF N PARAPET
120' - 6"
NL TOP OF RIDGE
129' - 0"
LKJHGFE
3
EL121N
CORRIDOR
101
CORRIDOR
101
CORRIDOR
101
NEW LAB LEVEL 1
100' - 0"
1 2 3 4 5 7
LAB OFFICES
102
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:11
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E301N
ELECTRICALLIGHTINGSECTIONS - BLDG663
Approver
19-0056.001
Author
1/8" = 1'-0"1 EL121N -11/8" = 1'-0"2 EL121N -2
1/8" = 1'-0"3 EL121N - 3
3
4
1
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
2
J
J
FD
FD
JJ
2
D
MDF
T111
LDP - 30
LDP - 29
LDP - 32LDP - 31
LDP - 27
LDP - 33
LDP - 34
LDP - 28
1 2 3 4 5 7
H
G
DOCK STAGING
121
CORRIDOR
101
MECH/BOILER
M119
N1
DWH
CENTRALRECEIVING
114
N2
BP
BAS PANEL
N1
ERP
N1
HHWP
N2
HHWP
N2
CHWP
N1
CHWP
N1
GT
N2
ET
N1
ET
7
15
1
9
2
E301N
LP2HP2
HP2 - 1,3,5
HP2 - 2,4,6
HP2 - 13,15,17
HP2 - 7,9,11
HP2 - 8,10,12
LP2 - 7
LP2 - 9
LP2 - 1
LP2 - 2
2 2
1
2
N1
BP
HP2 - 14,16,18
LP2 - 3
LP2 - 4
1
LAC
11
913 15
8810 1112
14
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:13
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E401N
ELECTRICALPOWERENLARGEDPLANS - BLDG 663
Approver
19-0056.001
Author
GENERAL SHEET NOTES
1. WALL MOUNTED 20AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-20R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.
2. WALL MOUNTED 30AMP POWER RECEPTACLE FOR RACK. PROVIDE NEMA L5-30R WITH 2#10+1#10G. SURFACE MOUNT RECEPTACLE; COORDINATE FINAL LOCATION WITH OWNER.
3. TELECOMM GROUND BUS AND GROUND WIRE BACK TO MAIN GROUND BUS; SEE GROUNDING DIAGRAM ON E601
4. POWER FOR FIRE ALARM POWER SUPPLY PANEL. COORDINATE WITH SYSTEM INSTALLER.
5. POWER FOR ACCESS CONTROL SYSTEM + POWER SUPPLY PANEL. COORDINATE WITH COMMUNICATION SYSTEM DRAWINGS AND SYSTEM INSTALLER.
6. PROVIDE PLYWOOD ON ALL WALL OF NEW IDF ROOM. COVER ALL WALL WITH A/C GRADE PLYWOOD SHEATHING, 3/4" THICK, 8’0” X 4’0” PANELS MOUNTED VERTICALLY STARTING AT 6” A.F.F., PAINT WITH FIRE RETARDANT PAINT TO MATCH WALL COLOR.
7. ALL RECEPTACLES IN MECH\BOILER ARE TO BE GFCI TYPE. MOUNT 36”AFF.
8. POWER TO HEATING HOT WATER PUMPS; 20A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.
9. CHILLED WATER PUMPS; 20A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.
10. POWER TO ENERGY RECOVERY PUMP; 20A-DELTA FEEDER. INSTALL VFD WITH INTEGRAL DISCONNECT ON WALL, PROVIDE CONNECTIONS TO VFD AND EXTEND FROM VFD TO PUMP. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.
11. PROVIDE POWER CONNECTIONS OF DOMESTIC HOT WATER HEATER AND CIRCULATION PUMP. COORDINATE CONNECTIONS WITH PLUMBING CONTRACTOR. PROVIDE SEPARATE MOTOR RATED SNAP SWITCH ADJACENT TO EACH UNIT AS LOCAL DISCONNECT.
12. POWER TO HVAC BMS CONTROL SYSTEM. COORDINATE FINAL LOCATION AND REQUIREMENTS WITH MECHANICAL CONTRACTOR.
13. LAB AIR COMPRESSOR CONNECTION; 20A-DELTA FEEDER. PROVIDE 30A/3P DISCONNECT ON WALL ADJACENT TO THE UNIT. COORDINATE FINAL WIRING REQUIREMENTS WITH PLUMBING CONTRACTOR.
14. EMERGENCY SHUTDOWN PUSH BUTTON FOR BOILERS. RED MUSHROOM BUTTON UNDER HINGED CLEAR PLASTIC COVER. BASIS OF DESIGN PILA ST120ES WITH ACCESSORY PILCLHCOV1 OR EQUAL. COORDINATE WITH CONTROLS CONTRACTOR AND MECHANICAL CONTRACTOR.
15. POWER TO BOILER; 2#10+1#10G FEEDER. INSTALL DISCONNECT ON WALL AND EXTEND TO BOILER. COORDINATE FINAL WIRING REQUIREMENTS WITH MECHANICAL CONTRACTOR.
SHEET KEYNOTES
A. COORDINATE WORK WITH ALL TRADES PRIOR TO INSTLATTTION.B. SEE MECHANICAL AND PLUMBING SHEETS FOR ADDITIONAL INFORMATION
REGARDING EQUIPMENT LAYOUTS AND LOCATIONS.C. LOCATE ALL ELECTRICAL EQUIPMENT TO PROVIDE NEC REQUIRED
CLEARANCES. D. COORDINATE ALL WIRING, CONNECTION AND CONTROLS FOR MECHANICAL
EQUIPMENT WITH MECHANICAL AND ATC CONTRACTORS. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES.
E. COORDINATE WITH COMMUNICATION SYSTEM DRAWINGS FOR ADDITIONAL REQUIREMENTS.
KEY PLAN
NO
RT
H
AREAM
AREAC
AREAN
663
643
330
12
1/4" = 1'-0"1 ELECTRICAL POWER FLOOR PLAN -ENLARGED MDF T111
1/4" = 1'-0"2 MECHANICAL ENLARGED PLAN - NEW BLDG 1
HHWSHHWRCHWSCHWRUNDERGROUND TO BUILDING 643
CHWS & CHWR UNDERGROUND CAMPUS CHILLED WATER SYSTEM.
1
4
5
6
6
STUB CONDUIT 2" ABOVECONCRETE BASE
MAKE ABSOLUTELY LEVEL
REFER TOLIGHT FIXTURESCHEDULE
GRADECONCRETE BASE #3000 PSI
1.5" PVC COND. (TYP)
1" CHAMFER ALL AROUND
POLE BASE
BOND ALL CONDUIT, POLEAND POLE BASE
30" MIN.
ANCHORBOLTS PVC
SEE STRUCTURALDETAILS FOR DEPTH(MIN. DEPTH 42")
8#6 VERT.HOOK ONEEND
MINIMUM OF#3 TIES AT 12"OCSEE STRUCTURALDETAILS
POLE BASE
BOND ALL CONDUIT, POLEAND POLE BASE
HAND HOLE
GRADE
NOTE: ALL PULL BOXES ARE TYPE "A" UNLESS NOTED OTHERWISE
DEPTH, SEE SCHEDULE
EXTEND CONDUITS 4"ABOVE BOTTOM, (2"ABOVE GRAVEL)
WIDE SWEEP BEND 6" CRUSH STONE BASE (2B CLEAN)
PULL BOX SCHEDULE
SIZE
13Wx13Lx18D
17Wx30Lx24D
TYPE
A
B
BURRY MARKER TAPE 12"BELOW FINISHED GRADE
POLYMER CONCRETESTACKABLE BOX, WITHOPEN BOTTOM
2" GRAVEL AT BOTTOM
1.5" PVC COND. (TYP)
30" MIN.POLE DEPTH(MIN. DEPTH 48")
PVC
24" DIA.
C5LIGHT POLE BASE DETAIL - CONCRETE BASE
E5LIGHT POLE BASE DETAIL - DIRECT BURY
E3HAND HOLE DETAIL
C2
A5A2
3/4" C. TO PREVIOUS INTRUSION ALARM DEVICE
120VAC
PWRSUPPLY
BACK TO CONTROLLER
J-BOX
3/4" CONDUIT. FOR POWER HINGE. IF APPLICABLE.FINISHEDCEILING
3/4" CONDUIT (TYPICAL)
FINISHEDFLOOR
3/4" CONDUIT (TYPICAL)
120VAC
PWRSUPPLY
J-BOX
FINISHEDCEILING
BACK TO CONTROLLER
ACCESS CONTROL TYPICAL ROUGH-IN DETAIL - DOUBLE DOORSCALE: NTS
ACCESS CONTROL TYPICAL ROUGH-IN DETAIL - SINGLE DOORSCALE: NTS
BACK TO CONTROLLER
J-BOX
3/4" CONDUIT. FOR POWER HINGE. IF APPLICABLE.
MOTORIZED DOOR OPERATOR TYPICAL ROUGH-IN DETAIL - DOUBLEDOOR
FINISHEDCEILING
DOOR OPERATOR
3/4" C. TO PREVIOUS INTRUSION ALARM DEVICE
120VAC
PWRSUPPLY
SCALE: NTS
SCALE: NTS
SCALE: NTS
SCALE: NTS
3/4" C. TO NEXT INTRUSIONALARM DEVICE POWER SUPPLY BY DOOR
HARDWARE CONTRACTOR
3/4" CONDUIT(TYPICAL) TO DOOROPERATOR
PUSH BUTTON ON OPP. SIDE OFWALL (REQ'S 4 SQ. DEEP W/ SINGLE
GANG RING) UP 48" A.F.F. TO TOP (IFREQUIRED)
PUSH BUTTON (REQ'S 4 SQ. DEEP W/SINGLE GANG RING) UP 48" A.F.F. TO TOP
(IF REQUIRED)
CRASH BAR PART# BY DOORHARDWARE CONTRACTOR.
CRASH BARPART# BYDOORHARDWARECONTRACTOR.
3/4" C. TO NEXT INTRUSIONALARM DEVICE
BACK-BOX LOCATED ABOVEACCESSIBLE CEILING SPACE
POWER SUPPLY BY DOORHARDWARE CONTRACTOR
REQUEST TO EXIT MOTION DETECTOR ONEGRESS SIDE OF WALL. (REQ'S 4 SQ. DEEPW/ SINGLE GANG RING MOUNTEDHORIZONTAL )
3/4" CONDUIT (TYPICAL) TORTE MOTION DETECTOR.
(AS APPLICABLE) 24DC MAG LOCK BYDOOR HARDWARE CONTRACTOR IFAPPLICABLE.
3/4" CONDUIT (TYPICAL) FORPOWER HINGE. IF APPLICABLE.
CRASH BAR PART# BY DOOR HARDWARECONTRACTOR.
CRASH BAR PART# BY DOORHARDWARE CONTRACTOR.
CARD READER (REQ'S 4 SQ. DEEP W/SINGLE GANG RING) UP 48" A.F.F. TO TOP
(IF REQUIRED)
CARD READER OR RQE BUTTON ON
OPP. SIDE OF WALL (REQ'S 4
SQ. DEEP W/ SINGLE GANG RING) UP 48"
A.F.F. TO TOP (IF REQUIRED)
REQUEST TO EXIT MOTION DETECTOR ONEGRESS SIDE OF WALL. (REQ'S 4 SQ. DEEP W/SINGLE GANG RING MOUNTED HORIZONTAL )
3/4" CONDUIT. FOR POWERHINGE. IF APPLICABLE.
CRASH BAR PART# BYHARDWARE
CONTRACTOR.
POWER SUPPLY BY DOORHARDWARE CONTRACTOR
3/4" C. TO NEXT INTRUSIONALARM DEVICE
3/4" C. TO PREVIOUSINTRUSION ALARM DEVICE
BACK-BOX LOCATED ABOVEACCESSIBLE CEILING SPACE
3/4" CONDUIT (TYPICAL) TORTE MOTION DETECTOR.
CARD READER (REQ'S 4 SQ W/SINGLE GANG RING) MOUNTEDAT +48" A.F.F. TO TOP.
RQE BUTTON ON OPP. SIDE OFWALL (REQ'S 4 SQ. DEEP W/SINGLE GANG RING) UP 48" A.F.F.TO TOP (IF REQUIRED)
24v DC ELECTRICAL STRIKE BYDOOR HARDWARE CONTRACTOR.
BACK-BOX LOCATED ABOVEACCESSIBLE CEILING SPACE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:14
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E501
ELECTRICALDETAILS
MG
19-0056.001
PU
LIGHTING CONTROL SCHEDULE AND DIAGRAMS
LEGEND FOR LIGHTING CONTROL DIAGRAMSSYMBOL DISCRIPTION
OFAPPLICATION
SMALL ROOM1 (OFFICE W/ WINDOW)
OS
S
277V
SMALL ROOM
2 (OFFICE NO WINDOW)OS
S
FINISHED CEILING
277V
3 NURSE LOBBY
OS
S
1" CONDUIT
4 NURSE COTS
S
S
S
S
S
S
CD
277V277V
CORRIDOR
RCDa
Db
D
D
D
DS
5
STORAGE, JANITOR,RESTROOM
M
277V277V S OS
D 11EXTERIOR
(TIME CLOCK W/OS OVERRIDE)
S
OSC (EXTERIOR)
D LCP LIGHTING CONTROL PANEL WITHASTRONOMICAL TIME CLOCK.
ROOM LTG
AC LTG
COT
COT
COT
COT
9 (TIME CLOCK W/OS OVERRIDE)
RC
OS
277V
OPEN OFFICE10 (TIME CLOCK W/
OS OVERRIDE)
S
OSC
D
RC RC
RCGENERIC SYMBOL FOR LIGHT FIXTURE, SEEPLAN FOR QUANTITY
LINE VOLTAGE WIRING
LOW VOLTAGE WIRING
ROOM CONTROL PANEL(CONCEALED ABOVE CEILING)
PUSH BUTTON. SEE FLOOR PLAN NOTES.
SK
STYPE 'C'MULTIPLE SENSORSALONG LENGTH OFCORRIDOR, SEE PLAN
S
RC
8GANGED TOILET 277V OS
DSK S
BD
OSD
7
AD
RC
OSMANUAL CONTROL
(EX. ELEC CLOSET, MECHRM, TECH RM)
277V SC
6
277V
BLOCKDIAGRAM OF
SYSTEM
RC
MEDIUM ROOM(EX. CONFERENCE, SMALL
CLASSROOM, FRONTDESK)
SDa
OS AS
OSB
Db
B: CEILING MOUNTED OCCUPANCY SENSOR,-LV WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO OCCUPANCY MODE.
C: CEILING MOUNTED OCCUPANCY SENSOR,-DAYLIGHT SENSOR,-LV WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO OCCUPANCY MODE.
D: CEILING MOUNTED OCCUPANCY SENSOR,-LINE VOLTAGE WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO OCCUPANCY MODE.
WALL SWITCH-LINE VOLTAGE
WALL SWITCH-LINE VOLTAGE-KEY OPERATED
D
WALL SWITCH-LOW VOLTAGE-DIMMING, ON\OFF, RAISE\LOWER +INDICATOR
MMOMENTARY OVERRIDE SWITCH-LOW VOLTAGE
SYMBOL DISCRIPTIONOF
APPLICATION
277V
BLOCKDIAGRAM OF
SYSTEM
RC
OSA
A: CEILING MOUNTED OCCUPANCY SENSOR,-DAYLIGHT SENSOR,-LV WIRING,-DUAL TECHNOLOGY ULTRASONIC + IR,-PROGRAM TO VACANTCY MODE.
SCALE: NTS SCALE: NTS
CEILING
12"
11
TV LOCATION
9
8
10
7 56
121 11
2
3
4
CL 9
8
10
7 56
6" ABOVE DOOR
121
2
3
4
COMPLY WITH NFPA-72 LIMIT OFTOP OF STROBE LAMP TO BE MAXOF 80"AFF
COMPLY WITH ADA LIMIT OF 48"AFF MAXTO OPERABLE HANDLE 6" TO CENTERLINE
BACK SPLASH
COUNTERTOP
FLOOR
SCALE: NTS
MA
X 6
'-7"
TO
CE
NT
ER
OF
HIG
HE
ST
BR
EA
KE
R/H
AN
DL
EP
ER
NE
C 4
04.8
MIN
UM
IN
18
" AF
F
UN
0
80
"
ST
RO
BE
ST
OB
E/H
OR
N
42
"
ST
OB
E/B
ELL
WA
LL
PH
ON
E
18
"
FIR
E A
LA
RM
MA
NU
AL
ST
AT
ION
SW
ITC
HO
UT
LE
T
DA
TA
SP
EC
IAL
PU
RP
OS
EO
UT
LE
T
TE
LE
PH
ON
E D
AT
A
EP
O
PU
SH
BU
TT
ON
/INT
ER
CO
M/V
UL
UM
N C
ON
TR
OL/E
TC
VE
RIF
Y W
/ AR
CH
ITE
CT
OU
TL
ET
DA
TA
DATA OUTLET DETAIL LIGHTING CONTROL DIAGRAM
DEVICE MOUNTING HEIGHT DETAIL
D1 D3
A1
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:14
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E502
ELECTRICALDETAILS
MG
19-0056.001
PU
B CA D F LB1 LB2 LB3 LB4
2003P
2003P
2003P
2003P
BLDG 643
6003P
6003P
MCC
2003P
2003P
6003P
SDP!
4003P
4003P
4003P
MDP, 1600A, 120/208V 3-PHASE, 4 WIRE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:14
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E601CM
ELECTRICAL DIAG- BLDG 330 + 643
Approver
19-0056.001
Author
GENERAL SHEET NOTESA. xx
SHEET KEYED NOTES
GENERAL SHEET NOTES
1. xx
1SINGLE LINE DIAGRAM - BLDG 330 & 6431/8" = 1'-0"
MM M
PANEL - LDP400A, 120/208V, 3P, 4W22KAIC
CAMPUS ELECTRICAL
DISTRIBUTION UTILITY
WNMUEXTERIORPAD MOUNTED XFMR
277/480V 3∅, SECONDARY
400Y
PROVIDE THREE GROUNDINGELECTRODE RODS AND TESTWELLS SEPARATED 10' APART
PROVIDE #1/0 INSULATEDCOPPER GROUNDINGELECTRODE CONDUCTOR IN3/4" CONDUIT TO WATERSERVICE PIPE
MAIN GROUND
#1/0
#2/0
PROVIDE 20'-0" LONG BARE #1/0 CU GROUNDING ELECTRODE (UFER) IN THE BUILDING FOUNDATION; ENCASED IN MINIMUM 2" OF CONCRETE ON ALL SIDES.
BUILDING STEEL
60A3P
SPD
100A3P
100A3P
LP2 LP3
100A3P
LP1
400A3P
100Y 100Y 100Y
PANEL - MDP400A, 277/480V, 3P, 4W65KAIC
TDL112.55kVA277/480V TO 120/208V
225Δ
400Y
400A3P
225A3P
60A3P
SPD
RTU-N2RTU-N1 RTU-N3
20A3P
##A3P
100A3P
##A3P
100A3P
##A3P
100A3P
#Δ
#Δ
##Δ
#Δ
##Δ
#Δ
20A3P
20A3P
30A3P
20A3P
15A3P
15A3P
15A3P
30A3P
#6
#6
#2/0
PIPE CONDUIT
CABLE TRAY
TELECOMGRND BAR
MPANELBOARD GROUND BUS
#2/0
#2/0
4
1
2
3
M
5
5
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:15
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E601N
ELECTRICALDIAGRAMS -BLDG 663
Approver
19-0056.001
Author
GENERAL SHEET NOTESA. SEE SPECIFICATIONS FOR ELECTRICAL SYSTEM STUDY AND ARC FLASH
ANALYSIS REQUIREMENTS.B. COORDINATE INSTALLATION AND REQUIREMENTS OF ELECTRICAL SERVICE
WITH NMSU UTILITY COMPANY. C. SEE CALCULATED FAULT CURRENT TABLE. THE CALCULATED AVAILABLE
SHORT CIRCUIT CURRENT AT FAULT POINT IS TO BE TREATED AS A MINIMUM VALUE, SELECT AND PROVIDE ALL EQUIPMENT TO EXCEED THE RESULT VALUES LISTED IN THE TABLE. TABLE VALUES ARE BASED ON EXPECTED LENGTHS, CONDUCTOR MATERIAL, CONDUCTOR SIZE, IMPEDANCE, CONDUIT MATERIAL, ETC. CONTRACTOR AND VENDOR TO PROVIDE FINAL ARC FLASH STUDY PER SPECIFICATION 260573. COORDINATE FINAL EQUIPMENT SELECTION AND RATING WITH CONTRACTOR PROVIDED STUDY.
D. INFORMATION SHOWN IS DIAGRAMMATIC, AND IS NOT INTENDED TO REPRESENT PHYSICAL ARRANGEMENTS OR LOCATIONS. ROUTING, CONNECTIONS AND PHYSICAL LAYOUTS ARE TO BE PER FIELD CONDITIONS AND AS INDICATED ELSEWHERE IN THE ELECTRICAL PLANS.
E. NEW NMSU UTILITY OWNED PAD MOUNTED TRANSFORMER. PROVIDE PAD PER NMSU REQUIREMENTS. COORDINATE LOCATION AND INSTALLATION WITH NMSU AND ALL SITE WORK. SEE SITE DRAWINGS.
F. BOND EQUIPMENT WITH EQUIPMENT BONDING JUMPER AND SIZE PER NEC.
SHEET KEYED NOTES
GENERAL SHEET NOTES
1. NEW UNIVERSITY OWNED UTILITY PAD MOUNTED TRANSFORMER. PROVIDE PAD AND VAULT PER PNM REQUIREMENTS. COORDINATE LOCATION AND INSTALLATION WITH NMSU AND ALL SITE WORK. SEE SITE DRAWINGS.
2. MAIN DISTRIBUTION PANEL MDP IS LOCATED IN THE MAIN ELECTRICAL ROOM.3. NEW PRIMARY ELECTRICAL SERVICE TO BE PROVIDED BY NMSU TO NMSU
OWNED TRANSFORMER. NMSU WILL EXTEND A NEW PRIMARY FEEDER, SEE SITE PLAN. COORDINATE INSTALLATION OF NEW SERVICE WITH NMSU.
4. NMSU ELECTRICAL METER ON SECONDARY SIDE OF TRANSFORMER; CT’S INSIDE TRANSFORMER; COORDINATE INSTALLATION WITH NMSU.
5. SURGE PROTECTION DEVICE (SPD) INTEGRAL TO GEAR.
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:16
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E701
ELECTRICALSCHEDULES
Approver
19-0056.001
Author
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:17
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E702C
ELECTRICALSCHEDULES
Approver
19-0056.001
Author
Notes:
Total Est. Demand: 137 A
Lighting 1999 VA 100.00% 1999 VA Total Conn.: 159 A
Power 28600 VA 100.00% 28600 VA Total Est. Demand: 49212 VA
Spare 540 VA 100.00% 540 VA Total Conn. Load: 57322 VA
Receptacle 26220 VA 69.07% 18110 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 199 A 164 A 125 A
Total Load: 23217 VA 19060 VA 15046 VA
71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 6663 6461 6259 6057 5855 Power - glycol pump 20 A 1 750 VA 450 VA 1 20 A Power VAVs 5653 (EX) Hot Water Pump 20 A 1 0 VA 1400... 5451 1400... 1400... 5249 1400... 1400...
3 20 A Receptacle - ICP-MS C110- UPS50
47Receptacle - ICP-MS C110- UPS 20 A 3
1400... 4500... 4845 1150... 4500... 4643
Receptacle - ICP-MS C110 20 A 21150... 4500...
3 60 A Receptacle - ICP-MS C110- UPS44
41 Lighting Space 101,112,113,114 20 A 1 869 VA 0 VA 1 20 A (EX) Fire Alarm Bell 4239 Receptacle - ICP-MS C110 20 A 1 540 VA 1500... 4037 1250... 1500...
2 30 A Receptacle - ICP-MS C11038
35Receptacle - ICP-MS C110 20 A 2
1250... 180 VA 1 20 A (EX) Drinking Fountain 3633 1500... 360 VA 1 20 A Receptacle - ICP-MS C110 3431
Receptacle - ICP-MS C110 30 A 21500... 360 VA 1 20 A (ex) Restroom receptacles 32
29 Receptacle - ICP-MS C110 20 A 1 360 VA 180 VA 1 20 A Receptacle - ICP-MS C110 3027 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 2825 Receptacle - Instrument C108 20 A 1 360 VA 0 VA 1 20 A Spare 2623 Receptacle - Instrument C108 20 A 1 180 VA 180 VA 1 20 A Receptacle - Instrument C108 2421 Receptacle - Instrument C108 20 A 1 1800... 1800... 1 20 A Receptacle - Instrument C108 2219 Receptacle - Instrument C108 20 A 1 1800... 1800... 1 20 A Receptacle - Instrument C108 2017 Receptacle - Instrument C108 - column 20 A 1 400 VA 400 VA 1 20 A Receptacle - Instrument C108 - column 1815 Receptacle - Instrument C108 - column 20 A 1 400 VA 400 VA 1 20 A Receptacle - Instrument C108 1613 Receptacle - Instrument C108 - column 20 A 1 1800... 1200... 1 20 A Receptacle - Instrument C108 - column 1411 Receptacle - Instrument C108 - column 20 A 1 1200... 1800... 1 20 A Receptacle - Instrument C108 - column 129 Receptacle - Instrument C108 20 A 1 780 VA 780 VA 1 20 A Receptacle - Instrument C108 107 Receptacle - Instrument C108 20 A 1 540 VA 360 VA 1 20 A Receptacle - Instrument C108 85 250 VA 500 VA 63
Power C108 Fume hood 20 A 2250 VA 500 VA
2 20 A Power C110 Fume hood4
1 Lighting Space 110 20 A 1 360 VA 780 VA 1 20 A Lighting Space 108 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Recessed Wires: 4 Mains Rating: 200 A
Supply From: (E) SDP2 Phases: 3 Mains Type:
Location: Space 127 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: (E) LB1
Notes:
Total Est. Demand: 51 A
Total Conn.: 51 A
Power 12700 VA 100.00% 12700 VA Total Est. Demand: 18510 VA
Spare 4010 VA 100.00% 4010 VA Total Conn. Load: 18510 VA
Receptacle 1800 VA 100.00% 1800 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 56 A 56 A 45 A
Total Load: 6525 VA 6565 VA 5420 VA
71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 300 VA 100 VA 1 20 A (EX) Control Panel HVAC 6663 300 VA 250 VA 1 20 A (EX) Main Entry Door Operator 6461
Power - roof ERU pump 20 A 3300 VA 250 VA 1 20 A (EX) Venturi Exhaust 62
59 3300... 100 VA 1 20 A (EX) Butterfly Exhaust 6057 3300... 100 VA 1 20 A EX) EMS Panel 5855
Power - LEF 60 A 33300... 250 VA 1 20 A (EX) West Door Operator 56
53 100 VA 1 20 A (EX) Unit Heater 5451 180 VA 1 20 A (EX) Exterior Receptacles 5249 180 VA 1 20 A (EX) Exterior Receptacles 5047 800 VA 4845 800 VA 4643
(EX) RTU SAF-2 VFD 45 A 3800 VA 44
41 4239 4037 3835 3633 3431 3229 3027 2825 2623 2421 2219 100 VA 1 20 A (EX) Fire Alarm Control Panel 2017 1815 1613 1411 Receptacle 20 A 1 180 VA 129 Power VAV - Lab C106 20 A 1 550 VA 600 VA 1 20 A Power 107 Power Fire Alarm FACP 20 A 1 100 VA 400 VA 1 20 A Power VAVs 85 Receptacle - Entry C101 20 A 1 180 VA 360 VA 1 20 A Receptacle - Entry C101 63 Receptacle - IT closet 20 A 1 360 VA 125 VA 41 Receptacle - IT closet 20 A 1 720 VA 125 VA
2 20 A Receptacle - IT closet2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Recessed Wires: 4 Mains Rating: 200 A
Supply From: (E) SDP2 Phases: 3 Mains Type:
Location: Space 113 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: (E) LB2
Notes:
Total Est. Demand: 50 A
Lighting 840 VA 100.00% 840 VA Total Conn.: 50 A
Power 5200 VA 100.00% 5200 VA Total Est. Demand: 18118 VA
Spare 2650 VA 100.00% 2650 VA Total Conn. Load: 18118 VA
Receptacle 9460 VA 100.00% 9460 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 46 A 51 A 56 A
Total Load: 5471 VA 6000 VA 6650 VA
71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6663 6461 6259 6057 5855 5653 5451 5249 5047 4845 4643 4441 4239 4037 3835 250 VA 1 20 A (EX) Exhaust Fan 3633 3431 3229 3027 2825 2623 1500... 2421
Receptacle Wash C102 - dryer 20 A 21500... 22
19 Receptacle Wash C102 20 A 1 180 VA 1100... 2017 Receptacle Wash C102 20 A 1 1800... 1100...
2 20 A jbox Wash C102 washer18
15 Receptacle Wash C102 - vac 20 A 1 1000... 540 VA 1 20 A Receptacle Wash C102 1613 Receptacle Balance C106B 20 A 1 900 VA 720 VA 1 20 A Receptacle Balance C106B 1411 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 129 Receptacle Sample C103 20 A 1 600 VA 360 VA 1 20 A Receptacle Sample C103 107 Receptacle Sample C103 20 A 1 360 VA 600 VA 1 20 A Receptacle Sample C103 85 800 VA 1200... 1 20 A Receptacle Sample C103 63 800 VA 1200... 1 20 A Receptacle Sample C103 41
(EX) RTU SAF-1 VFD 45 A 3800 VA 840 VA 1 20 A Lighting Space 132 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Recessed Wires: 4 Mains Rating: 200 A
Supply From: (E) SDP2 Phases: 3 Mains Type:
Location: Space 132 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: (E) LB3
Notes:
Lighting 660 VA 100.00% 660 VA Total Est. Demand: 109 A
Power 20900 VA 100.00% 20900 VA Total Conn.: 130 A
Spare 180 VA 100.00% 180 VA Total Est. Demand: 39309 VA
Receptacle 25000 VA 70.00% 17500 VA Total Conn. Load: 46809 VA
Lighting - Dwelling Unit 100 VA 100.00% 100 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 135 A 118 A 142 A
Total Load: 15910 VA 14150 VA 16750 VA
71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7269 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 7067 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6865 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6663 6461 6259 6057 5855 5653 Receptacle Grind 105B 20 A 1 360 VA 5451 Receptacle Grind 105B 20 A 1 1000... 360 VA 1 20 A Receptacle Grind 105B 5249 Receptacle Grind 105B 20 A 1 1000... 1000... 1 20 A Receptacle Grind 105B 5047 (EX) Rooftop Recept 20 A 1 180 VA 1250... 4845 Receptacle Grind 105B 20 A 1 1000... 1250...
2 20 A Receptacle Grind 105B46
43 Receptacle Grind 105B 20 A 1 360 VA 1200... 1 20 A Receptacle Grind 105B 4441 Receptacle Lab C105A 20 A 1 1200... 180 VA 1 20 A Receptacle Lab C105A 4239 Receptacle Lab C105A 20 A 1 360 VA 360 VA 1 20 A Receptacle Lab C105A 4037 Receptacle Space 132 20 A 1 360 VA 1200... 1 20 A Receptacle Space 132 3835 Receptacle Lab 132 - island 20 A 1 1200... 1200... 1 20 A Receptacle Lab 132 - island 3633 Receptacle Lab 132 - island 20 A 1 1200... 360 VA 1 20 A Receptacle Lab 132 - island 3431 Receptacle Space 132 20 A 1 1200... 360 VA 1 20 A Receptacle Lab 132 - island 3229 Receptacle Lab 132 - island 20 A 1 360 VA 1200... 1 20 A Receptacle Lab 132 - island 3027 Receptacle Lab 132 - island 20 A 1 1560... 720 VA 1 20 A Receptacle Lab 132 - island 2825 Receptacle Lab 132 - island 20 A 1 1560... 1560... 1 20 A Receptacle Lab 132 - island 2623 2700... 720 VA 1 20 A Receptacle Lab 132 - island 2421
Power - Lab Micro Digester 20 A 22700... 180 VA 1 20 A Receptacle - Lab extra recept 22
19 2700... 180 VA 1 20 A Receptacle - Lab Oven (B) 2017
Power - Lab Furnace - coordinate final breaker si... 40 A 22700... 1500... 1 20 A Receptacle - Lab Oven (A) 18
15 Receptacle - Vacuum Oven 20 A 1 600 VA 500 VA 1613 500 VA 500 VA
2 20 A Power C105A Fume hood14
11Power C105A Fume hood 20 A 2
500 VA 500 VA 129 500 VA 500 VA
2 20 A Power C106 Fume hood10
7Power C106 Fume hood 20 A 2
500 VA 500 VA 85 500 VA 500 VA
2 20 A Power C106 Fume hood6
3Power C106 Fume hood 20 A 2
500 VA 500 VA 41 Lighting Space 111 20 A 1 760 VA 500 VA
2 20 A Power C106 Fume hood2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Recessed Wires: 4 Mains Rating: 200 A
Supply From: (E) SDP2 Phases: 3 Mains Type:
Location: Space 132 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: (E) LB4
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:18
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E703C
ELECTRICALSCHEDULES
Approver
19-0056.001
Author
Notes:
Lighting 3495 VA 100.00% 3495 VA Total Est. Demand: 318 A
Power 67400 VA 100.00% 67400 VA Total Conn.: 391 A
Spare 7380 VA 100.00% 7380 VA Total Est. Demand: 114518 VA
Receptacle 62480 VA 58.00% 36240 VA Total Conn. Load: 140758 VA
Lighting - Dwelling Unit 100 VA 100.00% 100 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 428 A 384 A 366 A
Total Load: 51120 VA 45775 VA 43866 VA
17 18
15 16
13 14
11 1675... 6650... 12
9 1415... 6000... 10
7
(E) LB4 200 A 3
1591... 5471...
3 200 A (E) LB3
8
5 5420... 1504... 6
3 6565... 1906... 4
1
(E) LB2 200 A 3
6525... 2321...
3 200 A (E) LB1
2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Recessed Wires: 4 Mains Rating: 600 A
Supply From: Phases: 3 Mains Type:
Location: Space 127 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: (E) SDP2
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:19
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E704N
ELECTRICALSCHEDULES
Approver
19-0056.001
Author
Notes:
Total Est. Demand: 206 A
Lighting 13239 VA 100.00% 13239 VA Total Conn.: 245 A
Power 115750 VA 100.00% 115750 VA Total Est. Demand: 171431 VA
Receptacle 74480 VA 56.71% 42240 VA Total Conn. Load: 203671 VA
Lighting - Dwelling Unit 252 VA 100.00% 252 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 262 A 252 A 228 A
Total Load: 71728 VA 68855 VA 63087 VA
53 500 VA 1120... 54
51 500 VA 1145... 52
49
HP1 100 A 3
800 VA 1155...
3 100 A HP2
50
47 3111... 4200... 48
45 3766... 4200... 46
43
TDP 225 A 3
4091... 4200...
3 30 A RTU-N2
44
41 5100... 4200... 42
39 5100... 4200... 40
37
RTU-1N offices 20 A 3
5100... 4200...
3 30 A RTU-1
38
35 800 VA 36
33 800 VA 34
31 800 VA
3 15 A LEF-N1
32
29 0 VA 30
27 0 VA 28
25
SPD 60 A 3
0 VA 26
23 24
21 22
19 20
17 18
15 16
13 14
11 12
9 Power Open Office VAVs 20 A 1 300 VA 800 VA 1 20 A Power - INV1 LTG 10
7 Lighting CORRIDOR 101 20 A 1 420 VA 550 VA 1 20 A Power MAIN LAB 112 - vav 8
5 Lighting LARGE MASS 118 20 A 1 3957... 2069... 1 20 A Lighting LAB OFFICES-1 102-1 6
3 Lighting MECH/BOILER M119 20 A 1 2273... 1580... 1 20 A Lighting PROVER STATION 120 4
1 Lighting CORRIDOR 103 20 A 1 1065... 2171... 1 20 A Lighting ENGINE LAB 112A 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 400 A
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: Phases: 3 Mains Type:
Location: ELEC 115 Volts: 480/277 Wye A.I.C. Rating:
Branch Panel: MDP
Notes:
Total Est. Demand: 215 A
Total Conn.: 304 A
Total Est. Demand: 77440 VA
Power 35200 VA 100.00% 35200 VA Total Conn. Load: 109680 VA
Receptacle 74480 VA 56.71% 42240 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 349 A 322 A 259 A
Total Load: 40910 VA 37660 VA 31110 VA
83 2280... 1114... 8481 2830... 1154... 8279
LP2 100 A 34480... 1541...
3 100 A LP380
77 8990... 7875 1133... 7673
LP1 100 A 37110... 74
71 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 Power - rooftop humidifier 20 A 1 4200... 400 VA 1 20 A Power - rooftop humidifier 5249 Power U R105 elec hand dryer 20 A 1 950 VA 950 VA 1 30 A Power - INV2 5047 Power MDF T111 -FCU 20 A 1 500 VA 500 VA 1 20 A Power - site water service hot box heater 4845 Receptacle LAB OFFICES break area 20 A 1 180 VA 180 VA 1 20 A Receptacle LAB OFFICES break area 4643 Power W R107A elec hand dryer 20 A 1 950 VA 360 VA 1 20 A Receptacle LAB OFFICES-1 102-1 4441 Power CORRIDOR 101 door motor 20 A 1 250 VA 950 VA 1 20 A Power M R107B elec hand dryer 4239 Receptacle - east exterior 20 A 1 180 VA 500 VA 1 20 A Power VEST 103A - door motor 4037 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle Roof 3835 Power - site water service hot box heater 20 A 1 500 VA 720 VA 1 20 A Receptacle 3633 Power MDF T111 - FACP 20 A 1 250 VA 250 VA 1 20 A Power MDF T111 - Access Control 3431 Receptacle MDF T111 20 A 1 1500... 1500... 1 30 A Receptacle MDF T111 - 30A 3229 Receptacle MDF T111 20 A 1 360 VA 360 VA 1 20 A Receptacle MDF T111 3027 Receptacle MDF T111 20 A 1 360 VA 360 VA 1 20 A Receptacle MDF T111 2825 Receptacle VEND 104 - Provide GFCI breaker 20 A 1 400 VA 400 VA 1 20 A Receptacle VEND 104 - Provide GFCI breaker 2623 Receptacle Space 102-22 20 A 1 180 VA 720 VA 1 20 A Receptacle Space 102-22 2421 Receptacle Space 102-22 20 A 1 180 VA 180 VA 1 20 A Receptacle Space 102-22 2219 533 VA 180 VA 1 20 A Receptacle Space 102-22 2017 533 VA 800 VA 1815
Receptacle Cubicle 20 A 3533 VA 800 VA 16
13 533 VA 800 VA3 20 A Receptacle Cubicle
1411 533 VA 533 VA 129
Receptacle Cubicle 20 A 3533 VA 533 VA 10
7 Receptacle VEST 103A 20 A 1 1260... 533 VA3 20 A Receptacle Cubicle
85 Receptacle LAB OFFICES-4 102-4 20 A 1 180 VA 1080... 1 20 A Receptacle LAB OFFICES-4 102-4 63 Receptacle OFFICE 102A 20 A 1 1440... 900 VA 1 20 A Receptacle LAB OFFICES-1 102-1 41 Receptacle OFFICE 102D 20 A 1 1260... 1080... 1 20 A Receptacle OFFICE 102C 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Surface Wires: 4 Mains Rating: 100 A
Supply From: TDP Phases: 3 Mains Type:
Location: ELEC 115 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: LDP
Notes:
Total Est. Demand: 77 A
Total Conn.: 106 A
Total Est. Demand: 27670 VA
Power 7250 VA 100.00% 7250 VA Total Conn. Load: 38090 VA
Receptacle 30840 VA 66.21% 20420 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 129 A 97 A 93 A
Total Load: 15410 VA 11540 VA 11140 VA
83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 250 VA 1 20 A Power - FCU 5653 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 5451 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 5249 Spare 20 A 1 0 VA 1500... 1 20 A Receptacle MAIN LAB 112 - vac 5047 Spare 20 A 1 0 VA 1500... 1 20 A Receptacle SEED LAB 110 4845 Receptacle SEED LAB 110 20 A 1 720 VA 360 VA 1 20 A Receptacle SEED LAB 110 4643 Receptacle SEED LAB 110 20 A 1 900 VA 720 VA 1 20 A Receptacle SEED LAB 110 4441 Receptacle SEED LAB 110 20 A 1 1500... 1500... 1 20 A Receptacle SEED LAB 110 4239 Receptacle SEED LAB 110 20 A 1 1500... 1500... 1 20 A Receptacle SEED LAB 110 4037 Receptacle MAIN LAB 112 - vac 20 A 1 1500... 1500... 1 20 A Receptacle SEED LAB 110 -vac 3835 Receptacle MAIN LAB 112 20 A 1 360 VA 1500... 1 20 A Receptacle SEED LAB 110 3633 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 3431 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 3229 500 VA 500 VA 3027
Power MAIN LAB 112 - hood recept 20 A 2500 VA 500 VA
2 20 A Power MAIN LAB 112 - hood recept28
25 Receptacle MAIN LAB 112 20 A 1 720 VA 900 VA 1 20 A Receptacle KIT PREP 112C 2623 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 2421 Receptacle MAIN LAB 112 20 A 1 360 VA 180 VA 1 20 A Receptacle MAIN LAB 112 2219 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 2017 Receptacle MAIN LAB 112 20 A 1 720 VA 360 VA 1 20 A Receptacle MAIN LAB 112 1815 Receptacle MAIN LAB 112 20 A 1 720 VA 720 VA 1 20 A Receptacle MAIN LAB 112 1613 Receptacle MAIN LAB 112 20 A 1 720 VA 720 VA 1 20 A Receptacle MAIN LAB 112 1411 Receptacle MAIN LAB 112 20 A 1 360 VA 720 VA 1 20 A Receptacle MAIN LAB 112 129 Receptacle MAIN LAB 112 20 A 1 360 VA 360 VA 1 20 A Receptacle MAIN LAB 112 107 Receptacle ENGINE LAB 112A - ICE MACHINE 20 A 1 1500... 0 VA 1 20 A Spare 85 Receptacle ENGINE LAB 112A 20 A 1 360 VA 540 VA 1 20 A Receptacle ENGINE LAB 112A 63 Power ENGINE LAB 112A - Engine accessories 30 A 1 2500... 540 VA 1 20 A Receptacle ENGINE LAB 112A 41 Power ENGINE LAB 112A - Engine accessories 30 A 1 2500... 540 VA 1 20 A Receptacle ENGINE LAB 112A 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Surface Wires: 4 Mains Rating: 200 A
Supply From: LDP Phases: 3 Mains Type:
Location: Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: LP3
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
NOT FOR CONSTRUCTION
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%CONSTRUCTION
DOCUMENTS
10/12/2020
4343 Pan American Fwy NE, Suite 239
Albuquerque, New Mexico 87107 USA
505.877.4499 main - 512.744.4444 fax
www.eeace.com
EEA Project No. #V20200032
CONSULTING ENGINEERS
10
/9/2
02
0 6
:26
:20
PM
NM
SU
NM
DE
PT
OF
AG
RIC
UL
TU
RE
NE
W C
ON
ST
RU
CT
ION
/ R
EN
OV
AT
ION
LA
S C
RU
CE
S, N
EW
ME
XIC
O
E705N
ELECTRICALSCHEDULES
Approver
19-0056.001
Author
Notes:
Total Est. Demand: 2 A
Total Conn.: 2 A
Total Est. Demand: 1800 VA
Total Conn. Load: 1800 VA
Power 1800 VA 100.00% 1800 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 3 A 2 A 2 A
Total Load: 800 VA 500 VA 500 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 16
13 14
11 12
9 10
7 8
5 500 VA 6
3 500 VA 4
1
Power LARGE MASS 118 20 A 3
500 VA 300 VA 1 20 A Power PROVER STATION 120 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 250 A
Mounting: Recessed Wires: 4 Mains Rating: 100 A
Supply From: MDP Phases: 3 Mains Type:
Location: LARGE MASS 118 Volts: 480/277 Wye A.I.C. Rating:
Branch Panel: HP1
Notes:
Total Est. Demand: 41 A
Total Conn.: 41 A
Total Est. Demand: 34200 VA
Total Conn. Load: 34200 VA
Power 34200 VA 100.00% 34200 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 42 A 41 A 40 A
Total Load: 11550 VA 11450 VA 11200 VA
53 54
51 52
49 50
47 48
45 46
43 44
41 42
39 40
37 38
35 36
33 Power MECH/BOILER M119 20 A 1 250 VA 34
31 2700... 300 VA 1 20 A Power CENTRAL RECEIVING 114 32
29 2700... 2700... 30
27
Power ENGINE LAB 112A - Engine start 15 A 3
2700... 2700... 28
25 VAV POWER 20 A 1 50 VA 2700...
3 15 A Power ENGINE LAB 112A - Engine start
26
23 24
21 22
19 20
17 900 VA 1300... 18
15 900 VA 1300... 16
13
ERP-N1 15 A 3
900 VA 1300...
3 20 A LAC-1 (3HP)
14
11 900 VA 900 VA 12
9 900 VA 900 VA 10
7
HHWP-N1 (2HP) 15 A 3
900 VA 900 VA
3 15 A HHWP-N2 (2HP)
8
5 900 VA 900 VA 6
3 900 VA 900 VA 4
1
CHWP-N1 (2HP) 15 A 3
900 VA 900 VA
3 15 A CHWP-N2 (2HP)
2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 250 A
Mounting: Surface Wires: 4 Mains Rating: 200 A
Supply From: MDP Phases: 3 Mains Type:
Location: MECH/BOILER M119 Volts: 480/277 Wye A.I.C. Rating:
Branch Panel: HP2
Notes:
Total Est. Demand: 67 A
Total Conn.: 76 A
Total Est. Demand: 23990 VA
Power 10550 VA 100.00% 10550 VA Total Conn. Load: 27430 VA
Receptacle 16880 VA 79.62% 13440 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 59 A 97 A 77 A
Total Load: 7110 VA 11330 VA 8990 VA
83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 850 VA 850 VA 5249
Power MECH M116 - H3N 20 A 2850 VA 850 VA
2 20 A Power - H4N50
47 850 VA 850 VA 4845
Power MECH M116 20 A 2850 VA 850 VA
2 20 A Power MECH M11646
43 250 VA 1 20 A Power FCU 4441 850 VA 540 VA 1 20 A Receptacle 4239
Power MECH M116 20 A 2850 VA 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 3835 Receptacle PROVER STATION 120 20 A 1 360 VA 360 VA 1 20 A Receptacle PROVER STATION 120 3633 Receptacle PROVER STATION 120 20 A 1 540 VA 720 VA 1 20 A Receptacle PROVER STATION 120 3431 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 3229 Receptacle LARGE MASS 118 20 A 1 180 VA 0 VA 1 20 A Spare 3027 Receptacle LARGE MASS 118 20 A 1 360 VA 180 VA 1 20 A Receptacle LARGE MASS 118 2825 Receptacle LARGE MASS 118 20 A 1 360 VA 360 VA 1 20 A Receptacle LARGE MASS 118 2623 Receptacle LARGE MASS 118 - UPS 20 A 1 500 VA 500 VA 1 20 A Receptacle LARGE MASS 118 - UPS 2421 Receptacle LARGE MASS 118 20 A 1 720 VA 720 VA 1 20 A Receptacle LARGE MASS 118 2219 Receptacle - Pallet Jack - 20A 20 A 1 180 VA 540 VA 1 20 A Receptacle L ARGE MASS 118 - west wall 2017 Receptacle - Pallet Jack - 30A 30 A 1 1500... 180 VA 1 20 A Receptacle - Pallet Jack - 20A 1815 Receptacle RECEIPT DATA ENTRY 116 20 A 1 900 VA 1080... 1 20 A Receptacle RECEIPT DATA ENTRY 116 1613 Receptacle BV 116A - UPS 30 A 1 1500... 360 VA 1 20 A Receptacle MECH M116 1411 Receptacle BV 116A 20 A 1 360 VA 1000... 1 20 A Receptacle BV 116A 129 Receptacle BV 116A 20 A 1 540 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B east 107 Receptacle ECHELON LEVEL 1 AND 2 116B 20 A 1 540 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B east 85 600 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B west 63
PROVER roll-up door 20 A 2600 VA 360 VA 1 20 A Receptacle ECHELON LEVEL 1 AND 2 116B west 4
1 Receptacle LARGE MASS 118 20 A 1 360 VA 600 VA 1 20 A Large Mass roll-up door 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Recessed Wires: 4 Mains Rating: 100 A
Supply From: LDP Phases: 3 Mains Type:
Location: Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: LP1
Notes:
Total Est. Demand: 27 A
Total Conn.: 27 A
Total Est. Demand: 9590 VA
Power 5450 VA 100.00% 5450 VA Total Conn. Load: 9590 VA
Receptacle 4140 VA 100.00% 4140 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 38 A 24 A 19 A
Total Load: 4480 VA 2830 VA 2280 VA
53 54
51 52
49 50
47 48
45 46
43 44
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 Power CORRIDOR 101 20 A 1 250 VA 500 VA 1 20 A Power CORRIDOR 101 FCU 16
13 Receptacle CENTRAL RECEIVING 114 20 A 1 720 VA 720 VA 1 20 A Receptacle CORRIDOR 101 14
11 Receptacle DOCK STAGING 121 20 A 1 540 VA 540 VA 1 20 A Receptacle CENTRAL RECEIVING 114 12
9 BOILER BP-N1 20 A 1 1000... 180 VA 1 20 A Receptacle - west exterior 10
7 BOILER BP-N2 20 A 1 1000... 600 VA 8
5 Dock roll-up door 20 A 1 600 VA 600 VA2 20 A Dock leveler
6
3 DWH + CP 20 A 1 800 VA 100 VA 1 20 A BMS CONTROL PANEL 4
1 Receptacle MECH/BOILER M119 20 A 1 720 VA 720 VA 1 20 A Receptacle MECH/BOILER M119 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 1 A
Mounting: Surface Wires: 4 Mains Rating: 100 A
Supply From: LDP Phases: 3 Mains Type:
Location: MECH/BOILER M119 Volts: 120/208 Wye A.I.C. Rating:
Branch Panel: LP2
DRAWING LIST
COMMUNICATION NOTESGENERAL NOTES
ABBREVIATIONS
LEGENDGROUNDING AND BACKBONE CABLING DIAGRAM
GRADE LEVEL
BUILDING 643 SERVER ROOM
BUILDING GROUNDING
ELECTRODE SYSTEM
BUILDING 663
MAIN ELECTRICAL ROOM
BUILDING 663 MDF ROOM
1
T301
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:38pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
001.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T001
LEGEND
AND NOTES -
COMMUNICATIONS
DN
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
GG
M
H
SS
SS
SS
SS
SS
W
W
G
CO
SD
CO
SD
CO
SD
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
W
SS
T301
1
BUILDING 663
BUILDING 643
BUILDING 330
(RENOVATION SPACE)
·
·
·
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:38pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
100.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T100
SITE PLAN -
COMMUNICATIONS
1" = 30'-0"A3
SITE PLAN - COMMUNICATIONSNORTH
EQ & STOR
C107
CHEM & FLAM
STOR
C106A
BALANCE RM
C106B
INSTRUMENT
RM
C108
WASHING
C102
CHEMISTRY
LAB
C106
BV
C105
CLEAN LAB
C105A
GRINDING
C105B
SA
MP
LE
S
TO
R
C103
RECEIPT &
DATA ENTRY
C101
W
CR112
M
CR113
MECH
CM114
STOR
CS111
ICP-MS
C110
FIRE
C109
(E)2 (E)1(E)3(E)4(E)5
(E)C
(E)B
(E)A.1
J-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
K
J-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
K
J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK
D3
T101C
WALL RACK
NEW L
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:38pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
101.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T101C
BUILDING 643
PLANS -
CHEMISTRY -
COMMUNICATIONS
1/8" = 1'-0"A3
BUILDING 643 PLANS - CHEMISTRY - COMMUNICATIONSNORTH
1" = 1'-0"D3
BUILDING 643 - LOCKABLE CABINET AND SECURITY WALL FIELD
SECURITY
UP
MARKETING
M136
STOR
MA101
(E)1
(E)A.1
J-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
K
J-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
KJ-H
OO
K
J-HOOK J-HOOK J-HOOK J-HOOK
AV
P
FP
D
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:38pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
101.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T101M
BUILDING 330
PLANS -
MARKETING -
COMMUNICATIONS
1/8" = 1'-0"A4
BUILDING 330 PLANS - MARKETING - COMMUNICATIONSNORTH
.
DN
DN
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
STORAGE
118A
COOL STOR
112B
KIT PREP
112C
SEED LAB
110
M
R107B
W
R107A
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
ECHELON
LEVEL 1 AND 2
116B
PROVER
STATION
120
ELEC
115
OIL/AF
STOR
112D
MDF
T111
ENGINE LAB
112A
DRUM STOR
117
MAIN LAB
112
JAN
J109
LAB OFFICES
102
CENTRAL
RECEIVING
114
VESTIBULE
123
DOCK STAGING
121
RECEIPT DATA
ENTRY
116
LARGE MASS
118
MECH
M116
BV
116A
VEST
103A
CORRIDOR
103
CORRIDOR
101
VEND
104
U
R105
MECH/BOILER
M119
C
65421
B
A
7
M
L
K
J
H
F
E
D
G
31.7 6.3
H.1
G.5
K.8
2.61.2
AVP
FPD
T301
1
J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK
J-HOOK J-HOOK J-HOOK J-HOOK
J-H
OO
K
J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK J-HOOK
J-H
OO
KJ-H
OO
K
12"x4"
12"x4"
12"x4"
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:38pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
101.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T101N
BUILDING 663
PLANS - NEW LAB -
COMMUNICATIONS
1/16" = 1'-0"A3
BUILDING 663 PLANS - NEW LAB - COMMUNICATIONSNORTH
RE
LA
Y R
AC
KR
ELA
Y R
AC
K
BUILDING 663 MDF ROOM - PLAN VIEW
1
SCALE: 1/2" = 1'-0"
SE
CU
RIT
Y
FRONT
RACK VIEW
2
SCALE: NOT TO SCALE
RELAY RACK RELAY RACK
3
T301
6
T301
5
T301
4
T301
2
T301
OSP FIBER
24 PORT PATCH PANEL
48 PORT PATCH PANEL
48 PORT PATCH PANEL
48 PORT PATCH PANEL
CABLE MANAGEMENTCABLE MANAGEMENT
SECURITY
FRONT
SECTION VIEW
3
SCALE: 1/2" = 1'-0"
SECTION VIEW
4
SCALE: 1/2" = 1'-0"
SECTION VIEW
5
SCALE: 1/2" = 1'-0"
SECTION VIEW
6
SCALE: 1/2" = 1'-0"
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:39pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
301.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T301
TELECOM ROOM
DETAILS -
COMMUNICATIONS
Not to Scale
2
OMNI DIRECTIONAL WIRELESS ANTENNA DETAIL
Not to Scale
4
POWER AND DATA OUTLET DETAIL
Not to Scale
8
FPD AND AVP ROUGH-IN DETAIL
Not to Scale
7
FLOOR BOX CONDUIT PATHWAY
W
A
L
L
W
A
L
L
W
A
L
L
Not to Scale
3
COMMUNICATIONS OUTLET DETAIL
Not to Scale
6
POWER AT BACK OF RELAY RACK DETAIL
Not to Scale
5
WALL MOUNTED WIRELESS OUTLET DETAIL
Not to Scale
9
STACKED J-HOOK PATHWAY AS REQUIRED
INTERIOR CEILING
IN
TE
RIO
R W
AL
L
16" 16"
16"
16"
66" U
NLESS
IN
DICATED
DIFFEREN
TLY O
N
DRAW
IN
GS
AVP
FINISHED FLOOR LEVEL
D
E
C
K
G
Y
P
C
E
I
L
I
N
G
T
O
C
A
B
L
E
T
R
A
Y
Not to Scale
1
WIRELESS ACCESS POINT AT GYP/HARD CEILING
W
L
A
L
DECK
TO CABLE TRAY
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:39pm
Where:P
:\A
ustin\N
MS
U N
MD
A\D
atacom
-C
om
munications\T
401.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
T401
GENERAL
DETAILS -
COMMUNICATIONS
ABBREVIATIONS
LEGENDSECURITY NOTESNOT USED
SECURITY RISER
DRAWING LIST
X
SC301
LOCAL AREA
NETWORK
BUILDING 663
TELECOM
PATCH PANEL
TELECOM
SWITCH GEAR
T111
DATA
GATHERING
PANELS
CARD READER
DOOR POSITION SWITCH
REQUEST TO EXIT
TELECOM
PATCH PANEL
TELECOM
SWITCH GEAR
BUILDING 643
C101
DATA
GATHERING
PANELS
SURVEILLANCE CAMERA
CAM
INTERCOM_SYSTEM
CARD READER
DOOR POSITION SWITCH
REQUEST TO EXIT
SURVEILLANCE CAMERA
CAM
ACCESS CONTROL
SERVER
NETWORK VIDEO
RECORDER
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:45pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C001.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC001
LEGEND AND
NOTES -
SECURITY
EQ & STOR
C107
CHEM & FLAM
STOR
C106A
BALANCE RM
C106B
INSTRUMENT
RM
C108
WASHING
C102
CHEMISTRY
LAB
C106
BV
C105
CLEAN LAB
C105A
GRINDING
C105B
SA
MP
LE
S
TO
R
C103
RECEIPT &
DATA ENTRY
C101
W
CR112
M
CR113
MECH
CM114
STOR
CS111
ICP-MS
C110
FIRE
C109
E106
E109
EM
114
E101
E113
E112
E110
C105B
C105A
C105
C106B
C103
C101
E248
C106A
C107
E111
(E)2 (E)1(E)3(E)4(E)5
(E)C
(E)B
(E)A.1
4
SC301
1
SC301
1
SC302
7
SC301
4
SC301
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:45pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C101.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC101C
BUILDING 643
PLANS -
CHEMISTRY -
SECURITY
1/8" = 1'-0"A3
BUILDING 643 PLANS - CHEMISTRY - SECURITYNORTH
UP
MARKETING
M136
STOR
MA101
E186
E188
E192
E197
E198
E199
E200
E201
E202
(E)1
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:45pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C101.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC101M
BUILDING 330
PLANS -
MARKETING -
SECURITY
1/8" = 1'-0"A4
BUILDING 330 PLANS - MARKETING - SECURITYNORTH
.
DN
DN
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
STORAGE
118A
COOL STOR
112B
KIT PREP
112C
SEED LAB
110
M
R107B
W
R107A
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
ECHELON
LEVEL 1 AND 2
116B
PROVER
STATION
120
ELEC
115
OIL/AF
STOR
112D
MDF
T111
ENGINE LAB
112A
DRUM STOR
117
MAIN LAB
112
JAN
J109
LAB OFFICES
102
CENTRAL
RECEIVING
114
VESTIBULE
123
DOCK STAGING
121
RECEIPT DATA
ENTRY
116
LARGE MASS
118
MECH
M116
BV
116A
VEST
103A
CORRIDOR
103
CORRIDOR
101
VEND
104
U
R105
MECH/BOILER
M119
121B
120A
121A
114A
102C
102B
102A
110
115
102D
121C
112C
J109
112A
R107AR107B
T111
103
112D
114B
M119
103A
116
120B
118
123A
123B
117
112E
118A
R105
101A
102
112
112B
E299
123C
E183
E140
E207
C
65421
B
A
7
M
L
K
J
H
F
E
D
G
31.7 6.3
H.1
G.5
K.8
2.61.2
4
SC301
3
SC301
3
SC301
1
SC301
2
SC301
2
SC301
2
SC301
4
SC301
2
SC301
1
SC301
4
SC301
9
SC301
8
SC301
9
SC301
7
SC301
7
SC301
8
SC301
8
SC301
6
SC301
9
SC301
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
AREA M
AREA
C
AREA
N
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:46pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C101.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC101N
BUILDING 663
PLANS - NEW LAB -
SECURITY
1/8" = 1'-0"A3
BUILDING 663 PLANS - NEW LAB - SECURITYNORTH
OVERHEAD MONITORED DOOR
9
SCALE: Not to Scale
FINISHED FLOOR
UNSECURE SIDE
SECURE SIDE
WALL
FINISHED FLOOR
WALL
SECURE SIDE
SECURE SIDESECURE SIDE
UNSECURE SIDE
SECURE SIDE
SINGLE MONITORED DOOR
7
SCALE: Not to Scale
DOUBLE MONITORED DOOR
8
SCALE: Not to Scale
EXTERIOR MONITORED ROOF HATCH
6
SCALE: Not to Scale
FALSE CEILING
FINISHED FLOOR
WALL
UNSECURE SIDE
SECURE SIDE
UNSECURE SIDE
SINGLE ELEC. LOCK CARD READER DOOR
1
SCALE: Not to Scale
FALSE CEILING
FINISHED FLOOR
UNSECURE SIDE
SECURE SIDE
UNSECURE SIDE
WALL
SINGLE EXIT DEVICE CARD READER DOOR
2
SCALE: Not to Scale
DOUBLE EXIT DEVICE CARD READER DOOR
3
SCALE: Not to Scale
DOUBLE ELEC. LOCK CARD READER DOOR W/ INACTIVE LEAF
4
SCALE: Not to Scale
FALSE CEILING
FINISHED FLOOR
UNSECURE SIDE
SECURE SIDE
WALL
SECURE SIDE
SINGLE EXIT DEVICE MONITORED DOOR
5
SCALE: Not to Scale
FALSE CEILING
FINISHED FLOOR
UNSECURE SIDE
SECURE SIDE
UNSECURE SIDE
WALL
UNSECURE SIDEUNSECURE SIDE
FALSE CEILING
FINISHED FLOOR
UNSECURE SIDE
SECURE SIDE
WALL
UNSECURE SIDE
DECK
SECURE SIDE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:46pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C301.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC301
DOOR
ELEVATION
DETAILS -
SECURITY
OVERHEAD MONITORED DOOR
9
SCALE: Not to Scale
SINGLE MONITORED DOOR
7
SCALE: Not to Scale
DOUBLE MONITORED DOOR
8
SCALE: Not to Scale
EXTERIOR MONITORED ROOF HATCH
6
SCALE: Not to Scale
SINGLE ELEC. LOCK MULLION CARD READER DOOR
1
SCALE: Not to Scale
SINGLE EXIT DEVICE CARD READER DOOR
2
SCALE: Not to Scale
DOUBLE EXIT DEVICE CARD READER DOOR
3
SCALE: Not to Scale
DOUBLE ELEC. LOCK CARD READER DOOR W/ INACTIVE LEAF
4
SCALE: Not to Scale
SINGLE EXIT DEVICE MONITORED DOOR
5
SCALE: Not to Scale
S
T
O
R
EF
R
O
N
T
FINISHED FLOOR
STOREFRONT
FALSE CEILING
UNSECURE SIDE
SECURE SIDE
WALL
UNSECURE SIDE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:46pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C302 - D
OO
R E
LE
VA
TIO
N D
ET
AILS
- S
EC
UR
IT
Y.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC302
DOOR
ELEVATION
DETAILS -
SECURITY
W
A
L
L
LOCK POWER
SUPPLY
1P
1N
2P
2N
3P
3N
4P
4N
ON OFF
PO
WE
R D
IS
TR
IB
UT
IN
G
UN
IT
MAIN FUSE
N P
S
SW
1
L G
N
3.5
A 2
50
V
BA
T F
AIL N
C C
N
O N
C C
N
O A
C F
AIL
VR
1A
C
1
2V
-C
LO
SE
D
2
4V
-O
PE
N
DC
+BAT- -DC+
DEVICE
POWER
SUPPLY
1P
1N
2P
2N
3P
3N
4P
4N
ON OFF
PO
WE
R D
IS
TR
IB
UT
IN
G
UN
IT
MAIN FUSE
N P
S
SW
1
L G
N
3.5
A 2
50
V
BA
T F
AIL N
C C
N
O N
C C
N
O A
C F
AIL
VR
1A
C
1
2V
-C
LO
SE
D
2
4V
-O
PE
N
DC
+BAT- -DC+
DEVICE
POWER
SUPPLY
1P
1N
2P
2N
3P
3N
4P
4N
ON OFF
PO
WE
R D
IS
TR
IB
UT
IN
G
UN
IT
MAIN FUSE
N P
S
SW
1
L G
N
3.5
A 2
50
V
BA
T F
AIL N
C C
N
O N
C C
N
O A
C F
AIL
VR
1A
C
1
2V
-C
LO
SE
D
2
4V
-O
PE
N
DC
+BAT- -DC+
DATA
GATHERING
PANEL
DATA
GATHERING
PANEL
TYPICAL CARD READER DETAIL ( )
1
SCALE: Not to Scale
MONITORED DOOR POSITION SENSOR ( )
2
SCALE: Not to Scale
VIDEO INTERCOM MASTER STATION DETAIL ( )
3
SCALE: Not to Scale
WALL MOUNTED IP CAMERA DETAIL ( )
4
SCALE: Not to Scale
ACCESSIBLE CEILING MOUNTED IP CAMERA DETAIL ( )
5
SCALE: Not to Scale
PENDANT MOUNTED IP CAMERA DETAIL ( )
6
SCALE: Not to Scale
DECK MOUNTED CAMERA ( )
7
SCALE: Not to Scale
TYPICAL SECURITY WALL FIELD
9
SCALE: Not to Scale
W
A
L
L
W
A
L
L
D
R
O
P
C
E
I
L
I
N
G
D
E
C
K
D
E
C
K
W
A
L
L
D
E
C
K
INTERCOM DOOR STATION ( )
8
SCALE: Not to Scale
W
A
L
L
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
95%
CONSTRUCTION
DOCUMENTS
10/12/2020
NM
SU
N
M D
EP
T O
F A
GR
IC
UL
TU
RE
NE
W C
ON
ST
RU
CT
IO
N / R
EN
OV
AT
IO
N
LA
S C
RU
CE
S, N
EW
M
EX
IC
O
DF
19-0056.001
Who: R
andy C
ottingham
When: O
ct 08, 2020 - 02:47pm
Where:P
:\A
ustin\nm
su nm
da\datacom
-security\S
C401.dw
g
Th
is d
ra
win
g a
nd
d
esig
n is th
e in
te
lle
ctu
al p
ro
pe
rty o
f D
ata
Co
m D
esig
n G
ro
up
. a
nd
its clie
nts.
No
e
ntity/p
erso
n sh
all m
ake
co
pie
s a
nd
/o
r m
od
ifica
tio
ns to
th
is file
w
ith
ou
t w
ritte
n p
erm
issio
n b
y D
ata
Co
m
De
sig
n G
ro
up
. T
his d
ra
win
g sh
all n
ot b
e u
se
d fo
r p
urp
ose
s o
th
er th
an
a
s in
te
nd
ed
fo
r th
is p
ro
je
ct. ©
2
02
0
voice | data | audio | video | security | acoustics
| | |
AUSTIN SAN ANTONIO HOUSTON DALLAS
P: (512) 478-6001 F: (512) 478-2771
DATA COM
DESIGN GROUP
© 2020 DataCom Design Group.
voice | data | audio | video | security | acoustics
|
|
|
AU
ST
IN
SA
N A
NT
ON
IO
HO
US
TO
ND
AL
LA
S
P: (512) 478-6001 F
: (512) 478-2771
DATA
CO
M
DESIG
N G
RO
UP
JH
SC401
GENERAL
DETAILS -
SECURITY
A
BBAL BALANCEBDNG BEDDINGBKG BACKINGBLDG BUILDINGBLKG BLOCKINGBO_ BOTTOM OFBOT BOTTOMBRKT BRACKETBSC BIOLOGICAL SAFETY CABINETBSL-# BIOLOGICAL SAFETY LEVEL (NUMBER)
C
D
D DEEP, DEPTHDEG DEGREEDET DETAILDIA DIAMETERDIM DIMENSIONDIV DIVISIONDN DOWNDWG DRAWING(S)
EE EASTEA EACHEL ELEVATIONELEC ELECTRIC(AL)EMER EMERGENCYENGR ENGINEERENVIR ENVIRONMENT(AL)EP ELECTRICAL PANEL (SEE ELECTRICAL)EQ EQUALEQUIP EQUIPMENTEST ESTIMATE(D)EXH EXHAUSTEXIST EXISTINGEXT EXTERIOR
F
F FILLER (VERIFY WIDTH)F# FILLER, (NUMBER) INCH WIDEFB FIRE BLANKET (SEE DIV 10 SECTION)FD FLOOR DRAIN (SEE PLUMBING)FE FIRE EXTINGUISHER/BRACKET (SEE DIV 10 SECTION)FEC FIRE EXTINGUISHER CABINET (SEE DIV 10 SECTION)FH FUME HOODFLAM FLAMMABLEFLR FLOORFRZ FREEZERFT FOOT/FEETFUT FUTURE
G
GA GAUGEGALV GALVANIZEDGL GLASSGT GROUTGYP BD GYPSUM BOARD
H
H HIGH/HEIGHTHAZ HAZARD(OUS)HB HOSE BIBB (SEE PLUMBING)HDW HARDWAREHORIZ HORIZONTALHT HEIGHTHVY HEAVY
IID INSIDE DIAMETERIN INCH(ES)INC INCUBATORINSUL INSULATIONINT INTERIORISO ISOLATION
J
JT JOINT
K
KS KNEE SPACE
L
L-_ ANGLE-(SIZE)L LENGTHLAB LABORATORYLAM LAMINATELBS POUNDSLIQ LIQUIDLKR LOCKER (SEE DIV 10 SECTION)LLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLN LIQUID NITROGENLT LIGHT
M
N
N NORTHNA NOT APPLICABLENEG NEGATIVENIC NOT IN CONTRACTNO NUMBERNOM NOMINALNTS NOT TO SCALE
O
OC ON CENTEROD OUTSIDE DIAMETEROFCI OWNER FURNISHED, CONTRACTOR INSTALLEDOFOI OWNER FURNISHED, OWNER INSTALLEDOH OVERHEADOPH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOSC OVERHEAD SERVICE CARRIER
PPE POLYETHYLENEPHEN PHENOLICPLAM PLASTIC LAMINATEPLBG PLUMBINGPLYWD PLYWOODPNL PANELPOS POSITIVEPP POLYPROPYLENEPROJ SCRN PROJECTION SCREEN (SEE DIV 11 SECTION)PTD PAPER TOWEL DISPENSER (SEE DIV 10 SECTION)PTN PARTITION
R
R=_ RADIUS (DIMENSION)RAD RADIUSRCP REFLECTED CEILING PLAN (SEE ARCHITECTURAL)RE REFER TOREC RECESSEDREF REFRIGERATORREQ REQUIRE(D)REQ'S REQUIREMENTSREV REVISIONRH RELATIVE HUMIDITYRM ROOM
S
S SOUTHSBSTR SUBSTRATESCF SLOTTED CHANNEL FRAMING (SEE DIV 05 SECTION)SD SOAP DISPENSER (SEE DIV 10 SECTION)SHR SHOWERSHT SHEETSHV SHELF/SHELVINGSIM SIMILARSK SINKSP SPACE(S)SQ SQUARESPEC SPECIFICATIONSS SAFETY STATION (SEE PLUMBING)SSM SOLID SURFACE MATERIALSST STAINLESS STEELSTD STANDARDSTL STEELSTOR STORAGESTRUCT STRUCTURE/STRUCTURAL
T
U
UC UNDER-COUNTER, UNDER CABINETUCL UNDER-CABINET LIGHTUNO UNLESS NOTED OTHERWISEUPS UNINTERRUPTIBLE POWER SUPPLYUTIL UTILITY
VVAR VARIESVAV VARIABLE AIR VOLUMEVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVOL VOLUME
W
W WESTW WIDE/WIDTHW/ WITHW/O WITHOUTWD WOODWT WEIGHTWW WIREWAY (SEE ELECTRICAL)
QQTY QUANTITY
LABORATORY ABBREVIATIONS
C-_ CHANNEL-(SIZE)CAB CABINET(S)CAV CONSTANT AIR VOLUMECFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLEDCFOI CONTRACTOR FURNISHED, OWNER INSTALLEDCH CANOPY HOODCHEM CHEMICALCL CENTER LINECLG CEILINGCLOS CLOSURECLR CLEARCOL COLUMNCOMP COMPUTERCONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACT(OR)CS CUP SINKCSWK CASEWORKCTR COUNTERCTRL CONTROL(LED)CYL CYLINDER
MATL MATERIALMAX MAXIMUMMECH MECHANICALMFR MANUFACTURERMIN MINIMUMMKR BD MARKER BOARD (SEE DIV 10 SECTION)MTD MOUNTEDMTG MOUNTINGMTL METAL
T
& AND@ ATACC ACCESSIBLEADJ ADJUSTABLE, ADJACENTAFF ABOVE FINISHED FLOORAHJ AUTHORITY HAVING JURUISDICTIONALT ALTERNATEALUM ALUMINUMARCH ARCHITECT/ARCHITECTURALAW ARCHITECTURAL WOODWORK (SEE ARCH)
T THICK(NESS)TEMP TEMPERATURETHK THICK(NESS)THRU THROUGHTK BD TACK BOARD (SEE DIV 10 SECTION)TO_ TOP OFTR TROUGHTS-# TUBE STEEL-(SIZE)TYP TYPICAL
REFERENCE SYMBOLS LEGEND
N
NORTH ARROW
ENLARGED PLAN, DETAIL
SECTION/ELEVATION
ELEVATION, INTERIOR ELEVATION(S)
KEYED NOTE
REVISION TAG
SHT
# SHT
1
2
3
4
SHT
#
SHT#
1
X
WORK POINT
#'-#"SPOT ELEVATION
LINE TYPE LEGEND
CONTINUOUS - LAB FURNISHINGS & EQUIPMENT, EXCEPT AS INDICATED BELOW
DASH - HIDDEN ITEMS (ABOVE OR BELOW)
SMALL DASH - OWNER-FURNISHED EQUIPMENT / PRODUCT
SCREENED - EXISTING, NOT IN CONTRACT, OR BY OTHERS
COLUMN LINE
MATCH LINE
SCREENED DASH - HIDDEN ITEMS (ABOVE OR BELOW) EXISTING, NOT IN CONTRACT, OR BY OTHERS
LOOSE DASH - EXISTING TO BE REMOVED
CENTER LINE
BREAK LINE - MATERIAL CONTINUES
MATCH LINE
LABORATORY PLAN SYMBOLS LEGEND
LAB CASEWORK
COUNTERTOP MATERIAL AND HEIGHT TAG:
H/C
LS-##
EXHAUST CONNECTION
(SEE MECHANICAL)
LOCAL EXHAUST VENT
(SNORKEL)MOUNTING POINT
ARM
HEAD
CANOPY EXHAUST, ABOVE
(SEE MECHANICAL)
FUME HOOD
BIOLOGICAL
SAFETY CABINET
LAB EQUIPMENT (CFCI)
OWNER FURNISHED
EQUIPMENT / PRODUCT
FH-#X
BSC-#X####
####
EQUIP NAME
ACCESSORY TAG:XX-##
E36"
BSC TAG
BSC SERVICE
CUP SINKWHERE INDICATED
FUME HOOD TAG
FUME HOOD SERVICE ORDER (E @ BOTTOM)
LAB EQUIPMENT TAG
EQUIPMENT TAG(WHEN SCHEDULED)
GENERIC LABEL(UNLESS SCHEDULED)
UMBILICAL
PEGBOARD
LAB SINK
DRAIN GROOVES/BOARD WHERE INDICATED
LAB SINK TAG
DECK MOUNTED SERVICE FITTINGS
COUNTERTOP AND SPLASH
ABOVE/BELOW COUNTER ITEM
CASEWORK MOUNTED SERVICE FITTING (KS, IN-CABINET, APRON/PANEL AS NOTED)
E
WALL MOUNTED SERVICE FITTING, MOUNTING HEIGHT
A@
48"
XXXE
XXXE
LA = LAB ACCESSORYLE = LOCAL EXHAUST VENTLS = LAB SINKLT = LAB TABLEMC = MOBILE CARTPB = PEGBOARDUM = UMBILICAL(AND AS SCHEDULED)
(SEE GENERAL NOTES FORTYPICAL MATERIAL AND HEIGHT)
MATERIALS: HEIGHTS:E = EPOXY ADJM = SOLID SURFACE MATERIAL 24"
30" 36"
SAFETY STATION
CLEAR FLOOR SPACE 30"x60" MIN.TYPE VARIES (SEE PLUMBING)
ADJOINING CONSTRUCTION
CLEAR FLOOR SPACE
TYPE DESCRIPTIONSS-##
C1 - COMBINATION SAFETYSHOWER / EYEWASH, RECESSED
D1 - COMBINATION SAFETY SHOWER / EYEWASH, SURFACE
A
XX
WATERCW COLD WATER
HW HOT WATERH/C HOT & COLD WATER
PCWR PROCESS CHILLED WATER RETURN
PURIFIED WATER
DI DEIONIZED WATERDW DISTILLED WATER
PW PURE WATERRO REVERSE OSMOSIS WATER
SPECIAL GAS
CA COMPRESSED AIR (LAB)
ZA ZERO AIR
AR ARGON
CO2 CARBON DIOXIDE
H HYDROGENHE HELIUM
N NITROGENO2 OXYGENSG- SPECIAL GAS-(CHEMICAL SYMBOL)
OTHER PIPED SERVICESV VACUUM
ELECTRICAL AND DATA
D DATAE ELECTRICAL
LABORATORY SERVICE FITTING ABBREVIATIONS
SAFETYDH DRENCH HOSEEW EYE WASH
PCWS PROCESS CHILLED WATER SUPPLYPR PRE-RINSE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:40
PM
QL001
ABBREVIATIONS,LEGENDS ANDNOTES
JHL
19-0056.001
CJH
LABORATORY DRAWING LIST
QL001 ABBREVIATIONS, LEGENDS AND NOTES
QL010 SCHEDULES
QL030 LAB CASEWORK TYPES, LEGENDS AND NOTES
QL060 LABORATORY EQUIPMENT MATRIX
QL061 LABORATORY EQUIPMENT MATRIX
QL062 LABORATORY EQUIPMENT MATRIX
QL101 OVERALL LAB PLAN
QL111 BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PROVERMEZZANINE
QL120 BUILDING #663 - ENLARGED LAB CASEWORK PLAN & ELEVATIONS -METROLOGY
QL121 BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - METROLOGY
QL130 BUILDING #663 - ENLARGED LAB CASEWORK PLAN & ELEVATIONS -PETROLEUM AND SEED
QL131 BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PETROLEUM ANDSEED
QL140 BUILDING #643 - ENLARGED LAB CASEWORK PLAN & ELEVATIONS -CHEMISTRY
QL141 BUILDING #643 - ENLARGED LAB ELEVATIONS - CHEMISTRY
QL142 BUILDING #643 - ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY
QL901 TYPICAL LABORATORY CASEWORK
QL902 LABORATORY TABLE AND MOBILE CART DETAILS
QL903 LABORATORY DETAILS - ACCESSORIES
QL904 LABORATORY DETAILS - ACCESSORIES
QL905 LABORATORY DETAILS - ACCESSORIES
QL906 LABORATORY DETAILS - SERVICES AND FUME HOOD SECTIONS
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
LABORATORY FURNISHINGS AND EQUIPMENT GENERAL NOTES
A. DO NOT SCALE DRAWINGS, USE DIMENSIONS. DIMENSIONS NOTED "ASREQUIRED," "VERIFY," "VERIFY IN FIELD," "MATCH EXISTING" OR OTHERSIMILAR TERMS ARE TO BE VERIFIED BY THE CONTRACTOR. NOTIFYARCHITECT OF DISCREPANCIES AND OBTAIN CLARIFICATION BEFOREPROCEEDING.
B. CONDITIONS SHOWN ARE APPROXIMATE BASED ON INFORMATIONFURNISHED. NOTIFY ARCHITECT OF DISCREPANCIES AND OBTAINCLARIFICATION BEFORE PROCEEDING.
C. LAB CASEWORK SHALL BE METAL CASEWORK, UNO.
D. LAB COUNTERTOPS SHALL BE 1” EPOXY, UNO.
E. LAB COUNTERTOP HEIGHT SHALL BE 36”, UNO.
F. REFER TO SHEET QL-030 FOR OTHER LAB CASEWORK GENERAL NOTES.
G. LOCATE LOCAL EXHAUST DEVICES AT CENTER OF ACOUSTICAL CEILINGPANEL, UNO. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS.]
I. REFER TO LABORATORY EQUIPMENT LIST FOR LAB EQUIPMENT REFERENCEINFORMATION
TABLE SCHEDULE GENERAL NOTES:
A WORK SURFACE SHALL OVERHANG TABLE FRAME MINIMUM 1" EACH SIDE, UNO.B FOR TABLES WITH HEIGHT ADJUSTABLE LEGS, "H" INDICATES WORKSURFACE SET-UP HEIGHT: 36" UNLESS OTHERWISE DIRECTED BY OWNER. C PROVIDE HEIGHT ADJUSTABLE LEVELING DEVICES AT EACH TABLE LEG, UNO.
TABLE FRAME TYPE LEGEND
TYPE-A STANDARD METAL TABLE FRAMETYPE-B HEAVY-DUTY METAL TABLE FRAME
TABLE SCHEDULE KEYED NOTES:
1 NOT USED2 NOT USED3 4" DIA. SWIVEL/LOCKING CASTERS.4 COMBINATION LEVELING CASTERS.5 3" OVERHANG FRONT AND BACK OF TABLE TO ALLOW FOR APPARATUS CLAMPING.
/1 QL902
/2 QL902
/2 QL902
/2 QL902
/1 QL902
/1 QL902
/1 QL902
/1 QL902
LAB SINK SCHEDULE GENERAL NOTES:
A REFER TO DETAIL FOR TYPICAL SINK SERVICE FITTING MOUNTING CONDITIONS.B EPOXY SINKS, PROVIDE WITH CORNER DRAIN.
LAB SINK SCHEDULE KEYED NOTES:
1 DROP-IN (FLUSH MOUNT) AT COUNTERTOPS.
/1 QL906
FUME HOOD SCHEDULE GENERAL NOTES:
A REFER TO LAB PLAN TAG FOR UNIT WIDTH (#=FEET).B FUME HOOD DEPTH NOMINAL 36", UNO.C SEE MECHANICAL FOR EXHAUST CONNECTION, INCLUDING DUCT.D SEE PLUMBING AND ELECTRICAL FOR UTILITY SERVICES.E FUME HOOD WORK SURFACE SHALL BE 1-1/4" THICK EPOXY RESIN W/ RAISED (MARINE) EDGE, UNO.
/6 QL906
/6 QL906
/6 QL906
/7 QL906
/6 QL906
MOBILE CART SCHEDULE GENERAL NOTES:
A ADJUSTABLE HEIGHT WORK SURFACE TYPICAL. SET-UP HEIGHT AS SCHEDULED.
MOBILE CART SCHEDULE KEYED NOTES:
1 COMBINATION LEVELING CASTERS
MOBILE CART FRAME TYPE LEGEND
TYPE-A STANDARD DUTY CART
/3 QL902
/3 QL902
/3 QL902
A
A
A
/1 QL903
/2 QL903
/3 QL903
/4 QL903
/11 QL903
/10 QL903
/5 QL903
/7 QL903
/8 QL903
/1 QL904
- - -
12 (MOD) 12 (MOD) 30
43 18 65
- - -
26 19 79
- - -
- - -
- - -
- - -
24 - 36
14 14 -
30 (MOD) 30 (MOD) 40
8 8 -
/2 QL90526 8 -
2 / QL904
/1 QL905
- - -
/6 QL903
/9 QL903
81.75 29 35
/3 QL904
/1 QL901-
-
-
-
-
LABORATORY SERVICE FITTING SCHEDULE
TAG DESCRIPTIONS BASIS-OF-DESIGN PRODUCT - NOTES
WATERSAVER STANDARD
SERVICE TYPE MODEL NO. (UNO)
TAG FITTING
V V51
CA CA51
CW CW51
E 120V DUPLEX, GFIC
LABORATORY GAS NEEDLE VALVE FITTINGS (150 PSI MAX. WORKING PRESSURE)
CA, V 1SINGLE NEEDLE VALVE, WALL MOUNTED W/ THREADED ESCUTCHEON, AND REMOVABLE SERRATED HOSE END
L4880FT-325
CA, V 2SINGLE NEEDLE VALVE, DECK MOUNTED W/ TURRET BASE, MOUNTING SHANK AND REMOVABLE SERRATED HOSE END
L2880-131WSA
A REFER TO 1/QL-904 FOR DEVICE LOCATION CRITERIA AND TYPICAL DECK MOUNTING DETAILS.
B WALL MOUNTED LAB GAS SERVICE FITTINGS AT 48" AFF, UNO. REFER TO 2/QL-904 FOR TYPICAL WALL MOUNTING DETAILS
C SERVICE FITTING PLAN TAGS AT FUME HOODS REFER TO THE FOLLOWING SERVICE FITTING TYPES, UNO.
CW 51
REMOTE CONTROL WATER VALVE, PANEL MOUNTED (FRONT ACCESS); PANEL MOUNTED RIGID/SWING GOOSENECK WITH VACUUM BREAKER, MOUNTING SHANK, AND REMOVABLE SERRATED HOSE END
L740W-9RSVB
COORDINATE FITTING TYPE/MODEL NO. WITH FUME
HOOD CONSTRUCTION (STRAIGHT OR ANGLE FACE).
E ---120V DUPLEX RECEPTACLE, GFCI; STAINLESS STEEL FACE PLATE
--- PER FUME HOOD MFR.
SCHEDULE GENERAL NOTES
EW 1EYE WASH, DECK MOUNTED, SWING-DOWN ACTION (AUTO-FLOW)
EW849LH-R
BACK-LEFT LOCATION. EYE-CUPS SHALL BE W/IN SINK OPENING WHEN ACTIVATED, CLEAR OF OTHER FIXTURES. REFER TO PLUMBING FOR TEMPERED
WATER MIXING VALVE.
SS C1
SAFETY STATION TYPE-C1, RECESSED COMBINATION BARRIER-FREE SWING-DOWN EYE/FACE WASH W/ DRAIN PAN AND EMERGENCY SHOWER W/ WALL MOUNTED SHOWER HEAD
SSBF2170REFER TO PLUMBING FOR
TEMPERED WATER MIXING VALVE AND ALARM (IF ANY)
SS D
SAFETY STATION TYPE-D, SURFACE MOUNTED COMBINATION BARRIER-FREE SWING-DOWN EYE/FACE WASH W/ DRAIN PAN DISCHARGE TO FLOOR, AND EXPOSED EMERGENCY SHOWER HEAD
SSBF2173REFER TO PLUMBING FOR
TEMPERED WATER MIXING VALVE AND ALARM (IF ANY)
ELECTRICAL AND DATA SERVICE FITTINGS
D --- VOICE/DATA DEVICE; STAINLESS STEEL FACE PLATE ---SEE ELEC/COMM FOR TYPE OF
DATA DEVICE
E ---120V DUPLEX RECEPTACLE; STAINLESS STEEL FACE PLATE
---SEE ELEC FOR TYPE OF
RECEPTACLE DEVICE
FUME HOOD REMOTE CONTROL AND ELECTRICAL SERVICE FITTINGS
CA, N, V 51
REMOTE CONTROL NEEDLE VALVE, PANEL MOUNT (FRONT ACCESS); PANEL MOUNTED 45-DEG REMOVABLE SERRATED HOSE END AND MOUNTING SHANK
L740N-LR
COORDINATE FITTING TYPE/MODEL NO. WITH FUME
HOOD CONSTRUCTION (STRAIGHT OR ANGLE FACE).
LABORATORY WATER SERVICE FITTINGS
HC 1WATER MIXING FAUCET, DECK MOUNTED, 12"H X 6" RIGID/SWING GOOSENECK W/ VACUUM BREAKER AND REMOVABLE AREATOR
L414VB-55FURNISH REMOVABLE SERRATED
HOSE END.
CW 2SINGLE WATER FAUCET, DECK MOUNTED, 12" H X 6" RIGID GOOSENECK, W/ VACUUM BREAKER, REMOVABLE SERRATED HOSE END
L611VBLAB SINK - RIGHT CONTROL;
FURNISH REMOVABLE AERATOR
LABORATORY SAFETY FITTINGS
N N51
EW 2EYE WASH, DECK MOUNTED, SWING-DOWN ACTION (AUTO-FLOW)
EW849L
BACK-RIGHT LOCATION. EYE-CUPS SHALL BE W/IN SINK OPENING WHEN ACTIVATED, CLEAR OF OTHER FIXTURES. REFER TO PLUMBING FOR TEMPERED
WATER MIXING VALVE.
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:41
PM
QL010
SCHEDULES
JHL
19-0056.001
CJH
LABORATORY SINK SCHEDULE
TAGSINK TYPE
(COMPARTMENT)
NOMINAL COMPARTMENT SIZE (INCHES)
MATERIAL MOUNTING NOTESW D H
LS-01 SINGLE 25 15 10 EPOXY DROP-IN NOTE 1
LS-02 SINGLE 18 15 10 EPOXY DROP-IN NOTE 1
LABORATORY ACCESSORIES SCHEDULE
TAGSPECIFICATION
SECTION DESCRIPTION
BASIS OF DESIGN NOMINAL UNIT SIZE (INCHES)
COMMENTS DETAIL REF.MANUFACTURER MODEL NUMBER WIDTH DEPTH HEIGHT
LA-A 12 4053 GAS CYLINDER BRACKET SAFE-T-RACKSYSTEMS, INC.
SAFE-T-RACK BLOCK MODEL CB-1C(HIGH), AND MODEL CB-1 (LOW)
LA-B1 12 4053 GAS CYLINDER RACK SAFE-T-RACKSYSTEMS, INC.
SAFE-T-RACK CYLINDER RACK 12" X 12" CYLINDER MODULES. VERIFY CYLINDER SIZE WITHOWNER. CYLINDER RACKS MUST BE ABLE TO FIT UNDERCOUNTER
LA-B2 12 4053 GAS CYLINDER RACK TYPE-C (DEWER ANDTRANSPORTER)
SAFE-T-RACKSYSTEMS, INC.
1800 SERIES DEWER RACK 30" X 30" CYLINDER MODULES. VERIFY DEWER / LIQUIDCYLINDER SIZE WITH OWNER.
LA-F 12 4053 FLAMMABLE STORAGE CABINET JUSTRITE SURE-GRIP EX YELLOW SAFETYCABINET, MODEL 894520
45 GAL CAPACITY; 2-DOOR SELF-CLOSING
LA-P 12 4053 PASS THRU CHAMBER SEE SPECIFICATIONS - CHAMBER: 36" WIDE x 42" DEEP x 48" HIGH
LA-S 12 4053 GAS CYLINDER CABINET MATHESON 1178F HOLDS TWO CYLINDERS
LE-A1 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH
LE-A2 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH
LE-A3 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH
LE-A4 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH
LE-A5 12 4053 LOCAL EXHAUST VENT - SNORKEL TYPE A MOVEX TERFU SEE DETAIL FOR HOOD TYPE AND LEV TUBE LENGTH
PB-A 12 3553 PEG BOARD - TYPE A - STAINLESS STEEL LAB CASEWORK MFR W/ REMOVABLE CLEAR ACRYLIC PEGS; DRIP TRAY, DRAINOUTLET AND DRAIN HOSE
SG-A 12 3553 SPASH GUARD - TYPE A - STAINLESS STEEL LAB CASEWORK MFR SPASH GUARD AROUND 5 GAL TEST POUR AREA; VERIFY SIZEIN FIELD
UM-A 12 3553 UMBILICAL CHASE - TYPE A LAB CASEWORK MFR FLOOR MOUNTED
UM-B 12 3553 UMBILICAL CHASE - TYPE B LAB CASEWORK MFR BENCH MOUNTED
UM-C 12 3553 UMBILICAL CHASE - TYPE C LAB CASEWORK MFR FLOOR MOUNTED
LABORATORY TABLE SCHEDULE
TAG
WORK SURFACE (INCHES) HEIGHTADJUSTABLE
OR FIXED
TABLEFRAME
MATERIAL
WORKSURFACEMATERIAL
TABLEFRAMETYPE DETAIL NOTESW D H
LT-01 24 30 24 FIXED METAL EPOXY A
LT-02 48 30 24 FIXED METAL EPOXY A
LT-03 48 30 36 ADJ METAL EPOXY A NOTE 4
LT-04 60 30 36 ADJ METAL EPOXY A NOTE 4
LT-05 72 30 36 ADJ METAL EPOXY A NOTE 3, NOTE 5
LT-06 60 30 36 ADJ METAL EPOXY B NOTE 3, NOTE 5
LT-07 48 30 36 ADJ METAL EPOXY B NOTE 4
LT-08 60 30 36 ADJ METAL EPOXY B NOTE 4
LABORATORY FUME HOOD SCHEDULE
TAG TYPE VENTILATION SASH TYPE
WORKSURFACEMATERIAL
WORKSURFACEHEIGHT
(INCHES) DETAILON / OFFSWITCH LINER TYPE
FH-4A GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 36 NO - ON 24/7 FRP - FIBERGLASS REINFORCED POLYESTER
FH-4B GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 36 YES - ON/OFF FRP - FIBERGLASS REINFORCED POLYESTER
FH-4C GENERAL PURPOSE, BENCH TYPE CAV VERTICAL EPOXY 36 NO - ON 24/7 FRP - FIBERGLASS REINFORCED POLYESTER
FH-4D GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 30 YES - ON/OFF FRP - FIBERGLASS REINFORCED POLYESTER
FH-6A GENERAL PURPOSE, BENCH TYPE VAV VERTICAL EPOXY 36 NO - ON 24/7 FRP - FIBERGLASS REINFORCED POLYESTER
LABORATORY MOBILE CART SCHEDULE
TAG
WORK SURFACE (INCHES) CARTFRAME
MATERIAL
WORKSURFACEMATERIAL
CART FRAMETYPE DETAIL NOTESW D H
MC-01 48 30 36 METAL EPOXY NOTE 1
MC-02 60 30 36 METAL EPOXY NOTE 1
MC-03 72 30 36 METAL EPOXY NOTE 1
Axx06/07 OPH Axx08
Bxx06/Bxx07 OPH Bxx08Bxx04
CASEWORK TYPE
WIDTH INCHES
DRAWER/DOORCONFIGURATION
B 36 01
CASEWORK LEGEND
Q
Bxx02/Bxx03 OPH
13"D - Txx02/Txx03 OPH16"D - Txx12/Txx13 OPH22"D - Txx22/Txx23 OPH
13"D - Txx0416"D - Txx1422"D - Txx24
13"D - Txx06/Txx07 OPH16"D - Txx16/Txx17 OPH22"D - Txx26/Txx27 OPH
13"D - Txx0816"D - Txx1822"D - Txx28
Bxx31
K
J
F
B
A
W
Fxx08FLAMMABLE
Fxx06/Fxx07 OPHFLAMMABLE
FLUSHPANEL
ADJSHELVES
FLUSHPANEL
BACK PANEL OR PTN, TYP.
30" - 48" 30" - 48"
ADJSHELVES
FRAMEDGLASS DOOR
90
" U
NO
SECTIONCT
R H
ADJ SHELVES
CASEWORK TYPES
TAG DESCRIPTION TYPICAL DETAILS
A CORROSIVES STORAGE CABINET (ACIDS, BASES)
B STANDING HEIGHT BASE CABINET - 36"
C NOT USED
D NOT USED
E NOT USED
F FLAMMABLE / HAZARDOUS STORAGE CABINET
G NOT USED
H NOT USED
I NOT USED
J ADJUSTABLE SHELVING SYSTEMS
K KNEE SPACES
L SITTING HEIGHT BASE CABINET - 30"
M NOT USED
N NOT USED
O NOT USED
P PANEL SEE ILLUSTRATION ON THIS SHEET
Q EQUIPMENT SPACE
R NOT USED
S SINK BASE CABINET
T TALL CABINET
U NOT USED
V VACUUM PUMP CABINET
W WALL CABINET
X NOT USED
Y NOT USED
Z NOT USED
HORIZ RAIL
(TOP AND BOTTOM)
VERT RAIL
ADJ SHELVES
12" D - Jxx5218" D - Jxx62
WALL RAIL - 2 SHELVES
12" D - Jxx5318" D - Jxx63
WALL RAIL - 3 SHELVES
12" D - Jxx73ISLAND BENCHTOP
UPRIGHTS -3 SHELVES
13"D-Wxx56/Wxx57 OPH16"D-Wxx66/Wxx67 OPH
13"D-Wxx5816"D-Wxx68
FRAMEDGL. DR.FRAMEDGL. DR.
15" - 24" 30" - 48"
ADJSHELF
Fxx02/03 OPHFLAMMABLE
Fxx04FLAMMABLE
24"- 72" 24"- 72"
CT
R T
OP
30
",3
4",
36
"
18", 24" 30", 36", 48" 18"- 24" 30", 36", 48"
CT
R T
OP
36"
30" - 48" 30" - 48"
30", 36", 48"
15" - 24"
15" - 24"
S
18", 24" 18", 24"
CT
R T
OP
36"
49"
CT
R T
OP
36"
18", 24"
24"- 72"
CT
R T
OP
36"
15" - 24"
B
12" 12" 12"
ELEV
Bxx32
30" - 48"
/3 QL901
/2 QL901
/9 QL901
/7 QL901/5 QL901
/2 QL901
/4 QL901
/11 QL901
/8 QL901
/2 QL901
ADJ SHELVES
ADJOINING CONSTRUCTION, VARIES
Kxx11 - BACK PANELKxx12 - OPEN TO PARTITION
2" APRON RAIL
24" - 72"
T
VCT
R T
OP
36"
Vxx08
FLUSHPANEL
SWITCH
LOUVERS
30" - 48"
Qxx01 - OPEN TO UTILITY CHASEQxx02 - UTILITY CHASE CLOSURE
PNLS @ R & L OF EQPT SPACE
CTR TOP
OPEN TO PTN BEYOND
ADJACENT CASEWORK
30
", 3
4",
36
"C
TR
TO
P
36" MAX
30" - 48"
Sxx08
FLUSH PANEL
CT
R T
OP
36"
P
1 1/2"
CT
R T
OP
36"
4' - 10"
P4ISLAND BENCH END PANEL
84"
Lxx09
LLxx31
ADJSHELF
30" - 48" 15" - 24"
CT
R T
OP
30"
30" - 48"
Sxx48
CT
R T
OP
30"
FLUSH PANEL
Vxx28
30" - 48"
CT
R T
OP
30"
FLUSHPANEL
SWITCH
LOUVERS
/10 QL901
&
84" SOLID
DOOR
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:42
PM
QL030
LAB CASEWORKTYPES, LEGENDSAND NOTES
JHL
19-0056.001
CJH
CASEWORK GENERAL NOTES
A NOT ALL CASEWORK TYPES ARE USED. REFER TO LABDRAWINGS.
B LAB CASEWORK SHALL BE MODULAR, IN 3" INCREMENTS FORUNITS UP TO 30" WIDE; 6" INCREMENTS FOR UNITS 30" TO 48"WIDE.
C LAB CASEWORK BELOW FUME HOODS SHALL BE METAL LABCASEWORK, UNO.
D OVERALL COUNTERTOP LENGTH IS DETERMINED BY WIDTHOF CABINETS, FILLERS, OVERANGS, AND/OR DIMENSIONSINDICATED. OVERALL DIMENSIONS SHALL GOVERNREGARDLESS OF MANUFACTURER'S STANDARD DIMENSIONS.
E COUNTERTOPS SHALL OVERHANG BASE CABINETS 1"NOMINAL AT FRONT AND EXPOSED ENDS OF CABINETS, UNO.FRONT OVERHANG IS TO FACE OF CABINET DOORREGARDLESS OF CABINET STYLE. WHEN OVERALLDIMENSIONS ARE INDICATED, THE OVERHANG IS INCLUDED.
F AT WALL-TO-WALL CONDITIONS WITH OPEN KNEE-SPACEDIMENSION (K - - ##), DIMENSION SHALL BE DETERMINED INTHE FIELD. WHERE MORE THAN ONE OPEN KNEE-SPACEDIMENSION OCCURS, THE SPACE AVAILABLE SHALL BEEVENLY DISTRIBUTED.
G PROVIDE FILLERS TO CLOSE SPACE BETWEEN CABINETS,FUME HOODS, AND ADJOINING CONSTRUCTION. ATWALL-TO-WALL CONDITIONS, VERIFY FILLER SPACE IN FIELD;SPACE SHALL BE EVENLY DISTRIBUTED. PROVIDE NOMINAL 2"WIDE FILLER AT PERPENDICULAR WALL CONDITIONS, UNO.PROVIDE 1" WIDE FILLER BETWEEN TALL CABINETS AND THEADJOINING BASE/UPPER/WALL CABINET.
H COUNTERTOP HEIGHT IS NOMINAL, BASED ON LABCASEWORK MANUFACTURER'S CABINET MODULE HEIGHTAND COUNTERTOP MATERIAL (W/IN 3/4" OF REFERENCEDHEIGHT). WHERE 34" HEIGHT IS INDICATED, COUNTERTOPHEIGHT SHALL NOT EXCEED 34" AFF. AT KNEE-SPACES WITHAPRONS, CLEAR HEIGHT SHALL NOT BE LESS THAN 27".
I MAINTAIN OVERALL NOMINAL HEIGHT OF COUNTERTOPS.BEGIN CASEWORK INSTALLATION AT HIGH POINT OF FLOORAT EACH BENCH WITH CABINET LEVELERS SCREWED IN ASFAR AS POSSIBLE.
J COUNTERTOP DEPTH AT WALL CONDITIONS SHALL BE 30",INCLUDING OVERHANG, UNO. COUNTERTOP DEPTH ATISLAND/PENINSULA CONDITIONS SHALL BE 60", INCLUDINGOVERHANGS, UNO.
K FINISH EXPOSED-TO-VIEW COUNTERTOP EDGES, BACKS ANDENDS OF CURBS/SPLASHES.
L PROVIDE SEALANT AT JOINT BETWEEN BUILDINGCONSTRUCTION, AND COUNTERTOPS / CURBS / SPLASHES.
M CASEWORK TYPE-A, CORROSIVES CABINETS (ACIDS ANDBASES): METAL LAB CASEWORK, UNO. ACID STORAGETYPICAL, UNO. REFER TO DRAWING NOTES FOR STORAGECONTENTS OTHER THAN ACIDS, AND FOR DEDICATEDSTORAGE.
N CASEWORK TYPE-F, FLAMMABLE / HAZARDOUS MATERIALCABINETS: METAL LAB CASEWORK, UNO. REFER TO DRAWINGNOTES FOR STORAGE CONTENTS OTHER THAN FLAMMABLELIQUIDS, AND FOR DEDICATED STORAGE.
O NOT USED
P CASEWORK TYPE-J, ADJUSTABLE SHELVING SYSTEM:ADJUSTABLE SHELVES FOR WALL RAIL AND BENCHTOPUPRIGHT SHELVING UNITS SHALL BE METAL SHELVES ANDSHELF EDGE RETAINING RODS, UNO.
Q NOT USED
R CASEWORK TYPE-Q, EQUIPMENT SPACE: WIDTH INDICATED ISNOMINAL, VERIFY REQUIRED WIDTH WITH EQUIPMENTMANUFACTURE. WHERE EQUIPMENT HEIGHT RESULTS INCLEAR SPACE BETWEEN COUNTERTOP AND TOP OFEQUIPMENT GREATER THAN 3/4", PROVIDE FILLER/APRON TOMATCH ADJOINING CASEWORK. REFER TO MECHANIAL,PLUMBING AND ELECTRICAL DRAWINGS FOR UTILITYSERVICES.
S CASEWORK TYPE-T, TALL CABINETS: CASEWORK TYPEELEVATIONS ILLUSTRATE FRAMED GLASS DOORS WITHHORIZONTAL MULLION. DOORS W/OUT HORIZONTAL MULLIONARE ACCEPTABLE.
T CASEWORK TYPE-V, VACUUM PUMP CABINETS: INSULATEDCABINET WITHOUT CABINET BOTTOM. CABINETS TO BEEXHAUSTED; SEE MECHANICAL DRAWINGS FOR EXHAUSTCONNECTION INCLUDING DUCT. PROVIDE DOOR LOUVERS,TOE-KICK VENTS, OR UNDER-CUT DOOR FOR THRU-CABINETVENTILATION. PROVIDE CABINET WITH MOBILE PLATFORM,UNO; SIZE TO FIT CABINET.
1 Date 1 Revision 1
PE048 U444680 Vapor Pressure 3 Grabner VP-Xpert OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 200 - - - - - - - - - - - - - - - - - -
PE049 Sulfur Computer OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE050 U411693 Sulfur Instrument ANTEK 900VS OFOI 1 - Main Lab 19 25 43 65 B 1 X P 120 12 - - - - - - - - - - - - - -Oxygen,
from cylinder
- - - -
Kit Prep
PE051 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
PE052 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
PE053 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
Oil / Ant Stor
PE054 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
PE055 Wire Shelving Unit OFOI - 1 Kit Prep 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
(Equipment List Continues on Next Sheet)
ME012 Roller Table OFOI 1 - Large Mass 60 12 30 - F - - - - - - - - - - - - - - - - - - - - - - - -
ME013 UPS APC 750 OFOI 1 - Large Mass 14 8 4 11 F 1 X P 110 12 - - - - - - - - - - - - - - - - - - -
ME014 U449508 Mass Comparator 7 Mettler XPE 604 OFOI 1 - Large Mass 42 36 8 200 F 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -
ME015 Grinder OFOI 1 - Large Mass 10 8 8 - B 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -
ME016 Wire Wheel OFOI 1 - Large Mass 8 8 8 - B 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -
ME017 Drill press OFOI 1 - Large Mass 18 18 48 - F 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -
ME018 Tool Chest on Wheels OFOI 1 - Large Mass 30 18 48 - F - - - - - - - - - - - - - - - - - - - - - - - -
Metrology - Vestibule
ME019 Pallet Jack, Electric 2 OFOI 1 - Large Mass 27 48 36 - F 1 X P 11030
AMP CIRC
- - - - - - - - - - - - - - - - - - -
ME020 Pallet Jack, Electric 1 OFOI 1 - Large Mass 27 48 36 - F 1 - P 110 ~5 - - - - - - - - - - - - - - - - - - -
ME021 Pallet Jack, Manual OFOI 1 - Large Mass 27 48 36 - F - - - - - - - - - - - - - - - - - - - - - - - -
Metrology - Storage
ME022 Wire Shelving Unit OFOI - 1 Large Mass 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
ME023 Wire Shelving Unit OFOI - 1 Large Mass 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
Equip. Tag User ID Equipment Description Manufacturer Model No.
Fu
rnis
h &
Insta
ll
Exis
tin
g
Pu
rch
ase
New
New
Ro
om
Wid
th (
in)
Dep
th (
in)
He
igh
t (i
n)
Weig
ht
(lb
s)
Mo
un
tin
g
Lo
cati
on
Nu
mb
er
of
Ou
tlets
Ded
icate
d
Cir
cu
its
Hard
Wir
e /
Plu
g
Vo
lt
Am
p
Watt
s
Ph
as
e
Sin
gle
UN
O
Em
erg
en
cy
UP
S
Dis
co
nn
ect
Bo
x
Data
Co
ld W
ate
r
Ho
t W
ate
r
Pu
re W
ate
r
Dra
in
Co
mp
. A
ir
Nit
rog
en
Hyd
rog
en
Heliu
m
Oth
er
Gases
Exh
au
st
Dir
ec
t
Exh
au
st
Ind
irect
Tem
p /
RH
Co
ntr
ol
BT
U /
Ho
ur
Remarks
Metrology - Prover Mezzanine
ME001 - Prover - 25 gallon - - OFOI 1 - Prover Mezzanine 24 24 48 ~ 250 F - - - - - - - - - - - X - - - - - - - - - - - -
ME002 - Prover - 50 gallon - - OFOI 1 - Prover Mezzanine 36 36 60 ~ 550 F - - - - - - - - - - - X - - - - - - - - - - - -
ME003 - Prover - 100 gallon - - OFOI 1 - Prover Mezzanine 48 48 72 ~ 1150 F - - - - - - - - - - - X - - - - - - - - - - - -
Metrology - Large Mass
ME004 U321760 Mass Comparator 8 Mettler KG 3000 OFOI 1 - Large Mass 60 84 8 500 F 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -
ME005 U321719 Mass Comparator 6 Sartorius CC50001 OFOI 1 - Large Mass 72 96 36 20 F 1 - P 110 - 50 VA - X X - - - - - -45 psi, from
cylinder- - - - - - - -
These instruments require a room to be within 40 to 60 %RH +/- 20% per 4 hr. Temp:18 °C to 27 °C Max change +/-5.0 °C per 12 hr & +/- 3.0 °C per hr. Maintained at a positive pressure of 0.05 to 0.1 inches of water.ME006 UPS APC 750 OFOI 1 - Large Mass 14 8 4 11 F 1 X P 110 12 - - - - - - - - - - - - - - - - - - -
ME007 UPS APC 750 OFOI 1 - Large Mass 14 8 4 11 F 1 X P 110 12 - - - - - - - - - - - - - - - - - - -
ME008 Balance Table OFOI 1 - Large Mass 36 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -
ME009 U444702 Mass Comparator 9 Sartorius MCM5003 OFOI 1 - Large Mass 17 20 16 10 B 1 - P 110 - 35 VA - X X - - - - - - - - - - - - - - -
ME010 U444703 Mass Comparator 10 Sartorius MSA225S OFOI 1 - Large Mass 17 20 16 10 B 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -
ME011 Shop Vac OFOI 1 - Large Mass 20 20 24 - F 1 - P 110 ~10 - - - - - - - - - - - - - - - - - - -
ME024 Wire Shelving Unit OFOI - 1 Large Mass 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
ME025 Wire Shelving Unit OFOI - 1 Large Mass 48 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
Metrology - Bio-Vestibule for Echelon 1 and 2
ME026 U441355 UPS Battery Backup PowerBBP-3000-PSW-ONL-LCD
OFOI 1 - Metrology BV 9 17 15 79 B 1 X P 12030
AMP CIRC
- - - - - - - - - - - - - - - - - - -
ME027 U441357 UPS Battery Backup PowerBBP-3000-PSW-ONL-LCD
OFOI 1 - Metrology BV 9 17 15 79 B 1 X P 12030
AMP CIRC
- - - - - - - - - - - - - - - - - - -
Metrology - Echelon 1 and 2
ME028 U439986 Mass Comparator 1 Sartorius MCM 106 OFOI 1 - Echelon 1 and 2 17 20 16 10 B 1 - P 110 - 35 VA - X X - - - - - - - - - - - - - - - These instruments require a room to be within 40 to 60 %RH +/- 5% per hour. Temp:18 °C to 23 °C Max change +/-0.5 °C per 12 hr & +/- 0.3 °C per hr. Maintained at a positive pressure of 0.05 to 0.1 inches of water.
ME029 U412862 Mass Comparator 2 Sartorius CCE6 OFOI 1 - Echelon 1 and 2 16 14 16 10 B 1 - P 110 - 23 VA - X X - - - - - - - - - - - - - - -
ME030 U321715 Mass Comparator 3 Sartorius CC10000S OFOI 1 - Echelon 1 and 2 22 14 20 10 B 1 - P 110 - 15 VA - X X - - - - - - - - - - - - - - -
ME031 U408108 Mass Comparator 4 Sartorius CC30002 OFOI 1 - Echelon 1 and 2 35 17 31 10 B 1 - P 110 ~2 15 VA - X X - - - - - - - - - - - - - - -
ME032 U443461 Mass Comparator 5 Sartorius MCM 1005 OFOI 1 - Echelon 1 and 2 17 20 16 10 B 1 - P 110 ~2 - - X X - - - - - - - - - - - - - - -
Seed
SE001 U421068 Seed Germinator 1 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500
SE002 U421069 Seed Germinator 2 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500
SE003 U421029 Seed Germinator 3 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500
SE004 U421030 Seed Germinator 4 Percival GR-36L OFOI 1 - Seed 34 34 78 920 F 2 X P 115 13.9 - - - - - - - - - - - - - - - - - - 3500
SE005 U321661 Seed Germinator 5 Hoffman Manf. SG3055 OFOI 1 - Seed 37 36 84 930 F 1 X 1 115 ~14 - - - - - - - - - - - - - - - - - - -
SE006 U437185 Seed Germinator and Stand Achieva ATTGPT/C OFOI 1 - Seed 20 23 41 200 F 1 1 1 115 ~14 - - - - - - - - - - - - - - - - - - -
SE007 Seed Storage Cabinet - - OFOI 1 - Seed 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
SE008 Seed Storage Cabinet - - OFOI 1 - Seed 36 18 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
Petroleum - Engine Lab
PE001 U439442 CFR Octane Engine 1 CFR F1/F2 OFOI 1 - Engine Lab 52 28 36 Isolated Pad X HW 480 and 120 3 X X X X X X 6000
PE002 U439443 CFR Octane Engine 2 CFR F1/F2 OFOI 1 - Engine Lab 52 28 36 isolated Pad X HW 480 and 120 3 X X X X X X 6000
PE003 Mixing Station OFOI 1 - Engine Lab 24 24 48 B - - - - - - - - - - - - - - - - - - - - -Canopy Hood Above
- -Connected to vaccuum pump and fuel drums
PE004Vacuum Pump for fuel into mixing station
OFOI 1 - Engine Lab 8 8 8 - B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE056 Ice Maker Manitowoc QM45A OFOI 1 - Engine Lab 20 23 37 - F 1 X P 120 5.2 - - - - - - X - - X - - - - - - - - 1750
Petroleum - Main Lab
PE005 Refrigerator / Freezer, Flammable Material Storage OFOI - 1 Main Lab 30 30 30 - F 1 X P 120 ~10 - - - - - - - - - - - - - - - - - - -
PE034 U438892 Flash point 4 PAC optiflash OFOI 1 - Main Lab 15 19 23 40 B 1 - P 110 - 1100 - - - - - - - - - - - - - - - - - -
PE035 U442506 Flash point 5 Grabner FLP-Touch OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -
PE036 U444623 Flash point 6 Grabner FLP-Touch OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -
PE037 U444624 Flash point 7 Grabner FLP-Touch OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -
PE038 U320556 Viscometer Main Unit Koehler K-23380 OFOI 1 - Main Lab 10 18 21 60 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE039 Viscometer Power Supply OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -
PE040 Viscometer Waste Receiver OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -
PE041 U439037 Viscometer Main Unit Cannon miniav-x OFOI 1 - Main Lab 10 18 21 45 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE042 Viscometer Power Supply OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -
PE043 Viscometer Waste Receiver OFOI 1 - Main Lab 13 16 7 - B - - - - - - - - - - - - - - - - - - - - - - - -
PE044 U320498 Scale A&D company FR-300 OFOI 1 - Main Lab 8 14 15 25 B 1 - P 110 ~2 - - - - - - - - - - - - - - - - - - -
PE045 U320536 Vapor liquid ratio Grabner Minivol LVR OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 65
PE046 U320492 Vapor pressure instrument 1 Grabner MiniVAP VPS OFOI 1 - Main Lab 10 11 15 20 B 1 - P 115 - 80 - - - - - - - - - - - - - - - - - -
PE047 U435414 Vapor Pressure 2 Grabner MiniVap VPXpert OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 200 - - - - - - - - - - - - - - - - - -
PE006 U320741Refrigerator (explosion proof / Flammable Material Storage)
VWR Scientific OFOI 1 - Main Lab 29 26 65 200 F 1 X P 120 ~10 - - - - - - - - - - - - - - - - - - -
PE007 HRFF Computer OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE008 U409064 HFRR controller PCS instruments D811 OFOI 1 - Main Lab 12 16 6 60 B 1 - P 120 - 80 - - - - - - - - - - - - - - - - - -
PE009 U409065 HFRR microscope PCS instruments OFOI 1 - Main Lab 10 12 18 - B 1 - P 120 ~1 - - - - - - - - - - - - - - - - - - -
PE010 U409066 HFRR cabinet PCS instruments 0583-14 OFOI 1 - Main Lab 16 6 9 - B 1 - P 120 ~1 - - - - - - - - - - - - - - - - - - -
PE011 U320528 Centrifuge Precsion Scientific OFOI 1 - Main Lab 26 26 24 75 F 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -
PE012 U413395 GC 1 Shimadzu GC-2010 OFOI 1 - Main Lab 37 20 33 65 B 1 X P 115 - 2600 VA - - - - X - - - - X -From
cylinderFrom
cylinder- - Snorkel - -
PE013 GC Computer 1 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE014 U413396 GC 2 Shimadzu GC-2010 OFOI 1 - Main Lab 37 20 33 65 B 1 X P 115 - 2600 VA - - - - X - - - - X -From
cylinderFrom
cylinder- - Snorkel - -
PE015 GC Computer 2 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE016 U320512 Furnace VWR 1300U OFOI 1 - Main Lab 17 17 26 50 B 1 - P 120 2 - - - - - - - - - - - - - - - - - - -
PE017 U404696 Distillation unit 1 PAC AD86 5G2 OFOI 1 - Main Lab 22 29 32 150 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE018 U435415 Distillation unit 2 Grabner MiniDis ADXpert OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 200 - - - - - - - - - - - - - - - - - -
PE019 U449559 Distillation unit 3 PAC Opti Dist OFOI 1 - Main Lab 10 11 15 20 B 1 X P 120 - 1400 - - - - - - - - - - - - - - - - - -
PE020 U413473 IR 1 Thermo Nicolet 380 OFOI 1 - Main Lab 19 25 10 65 B 1 X P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE021 IR Computer 1 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE022 U434449 IR 2 Thermo Nicolet 6700 OFOI 1 - Main Lab 28 27 13 150 B 1 X P 110 ~5 110 - - - - - - - - - - - - - - - - - -
PE023 IR Computer 2 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE024 U449299 IR 3 Grabner IR Vision OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 130 - - - - - - - - - - - - - - - - - -
PE025 IR Computer 3 OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE026 U409038 NIR Analytical Spectral Devices
5030 OFOI 1 - Main Lab 32 20 28 30 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE027 NIR Computer OFOI 1 - Main Lab 24 24 24 - B 2 - P 120 ~10 - - - - - X - - - - - - - - - - - - -
PE028 U419709 Existent Gum Bath Koehler K33780 OFOI 1 - Main Lab 27 12 16 45 B 1 X P 120 - 1500 - - - - - - - - - - - - - - - - - -
PE029 U320484 Copper Corrosion Bath Precision Scientific OFOI 1 - Main Lab 16 12 25 50 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
PE030 U320486 Cool Bath Brinkmann RMT 6 Lauda OFOI 1 - Main Lab 11 15 24 45 B 1 - P 115 - 1.2 kW - - - - - - - - - - - - - - - - - -
PE031 U320494 Flash point 1 Grabner Miniflash FLP OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -
PE032 U411694 Flash point 2 PAC HFP339 OFOI 1 - Main Lab 11 21 21 40 B 1 - P 110 - 1100 - - - - - - - - - - - - - - - - - -
PE033 U411741 Flash point 3 Grabner Miniflash FLP OFOI 1 - Main Lab 10 11 15 20 B 1 - P 110 - 150 - - - - - - - - - - - - - - - - - -
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:48
PM
QL060
LABORATORYEQUIPMENTMATRIX
CJH
19-0056.001
CJH
LABORATORY EQUIPMENT MATRIX GENERAL NOTES:
A. OFOI BASIS-OF-DESIGN PRODUCTS: MANUFACTURER’S PRODUCTS NAMED IN THE LABORATORY EQUIPMENT MATRIX, INCLUDING MAKE, MODEL NUMBER OR OTHER DESCRIPTION, FORM THE BASIS-OF-DESIGN TO ESTABLISH SIGNIFICANT QUALITIES RELATED TO TYPE, FUNCTION, DIMENSION, IN-SERVICE PERFORMANCE, UTILITIES, PHYSICAL PROPERTIES, APPEARANCE AND OTHER CHARACTERISTICS. FINAL PRODUCT SELECTIONS MAY VARY.
B. EXISTING LABORATORY EQUIPMENT: INFORMATION IS BASED ON OWNER-FURNISHED INFORMATION FURNISHED IN SPRING 2020. EXISTING LABORATORY EQUIPMENT INFORMATION IS APPROXIMATE, BASED ON VISUAL OBSERVATIONS, NAME PLATES WHEN ACCESSIBLE, AND OWNER-FURNISHED EQUIPMENT DATA WHEN AVAILABLE. DIMENSIONS, ELECTRICAL, PIPED UTILITY, AND ENVIRONMENTAL CONTROL INFORMATION IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE REQUIREMENTS FOR EXISTING EQUIPMENT TO BE REUSED.
C. CONTRACTOR-FURNISHED ITEMS: REFER TO SPECIFICATION SECTIONS INDICATED FOR CONTRACTOR FURNISHED ITEMS.
D. OWNER-FURNISHED ITEMS: CONTRACTOR SHALL VERIFY PRODUCTS WITH THE OWNER. REFER TO PROJECT MANUAL DIVISION 1 SECTION “SUMMARY” FOR INFORMATION CONCERNING OWNER- FURNISHED PRODUCTS.
E. MANUFACTURER’S PRODUCT DATA INFORMATION IS FURNISHED FOR REFERENCE ONLY. MANUFACTURER’S PRODUCT INFORMATION IS SUBJECT TO CHANGE WITHOUT NOTICE.
F. IN CASE OF DISCREPANCY BETWEEN LABORATORY EQUIPMENT MATRIX INFORMATION AND MANUFACTURER’S PRODUCT INFORMATION, THE MANUFACTURER’S INFORMATION SHALL GOVERN. NOTIFY ARCHITECT OF DISCREPANCIES AND OBTAIN CLARIFICATION.
G. NEW OFOI EQUIPMENT INFORMATION LISTED ON THE MATRIX IS AN EXAMPLE ONLY; FINAL SELECTION TO BE MADE BY THE OWNER
LABORATORY EQUIPMENT MATRIX ABBREVIATIONS:
FURNISH & INSTALL CFCI - CONTRACTOR FURNISHED, CONTRACTOR INSTALLED OFOI - OWNER FURNISHED, OWNER INSTALLED
MOUNTING OPTIONS: B - BENCH F - FLOOR W - WALL C - CEILING UC - UNDERCOUNTER
OTHER ABBREVIATION: TBD - TO BE DETERMINED UNO - UNLESS NOTED OTHERWISE ~ - VALUE IS APPROXIMATE
CH060 U449300 Balance A Mettler-Toledo, LLC XSR205DU OFOI 1 - Balance Room 8 18 11 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -
CH061 U449301 Balance B Mettler-Toledo, LLC XSR205DU OFOI 1 - Balance Room 8 18 11 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -
CH062 U440150 Balance 5 Ohaus Corporation Adventurer OFOI 1 - Balance Room 9 14 14 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -
CH063 U440149 Balance 6 Ohaus Corporation AX224 OFOI 1 - Balance Room 9 14 14 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -
CH064 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH065 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH066 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH067 Balance Table OFOI - 1 Balance Room 48 24 30 - F - - - - - - - - - - - - - - - - - - - - - - - -
(Equipment List Continues on Next Sheet)
Equip. Tag User ID Equipment Description Manufacturer Model No.
Fu
rnis
h &
Insta
ll
Exis
tin
g
Pu
rch
ase
New
New
Ro
om
Wid
th (
in)
Dep
th (
in)
He
igh
t (i
n)
Weig
ht
(lb
s)
Mo
un
tin
g
Lo
cati
on
Nu
mb
er
of
Ou
tlets
Ded
icate
d
Cir
cu
its
Hard
Wir
e /
Plu
g
Vo
lt
Am
p
Watt
s
Ph
as
e
Sin
gle
UN
O
Em
erg
en
cy
UP
S
Dis
co
nn
ect
Bo
x
Data
Co
ld W
ate
r
Ho
t W
ate
r
Pu
re W
ate
r
Dra
in
Co
mp
. A
ir
Nit
rog
en
Hyd
rog
en
Heliu
m
Oth
er
Gases
Exh
au
st
Dir
ec
t
Exh
au
st
Ind
irect
Tem
p /
RH
Co
ntr
ol
BT
U /
Ho
ur
Remarks
Chemistry
Chemistry Lab
CH001 Vacuum Oven Precision Scientific 31468 OFOI 1 - Chemistry Lab 13 17 18 - B 1 - P 120 5 600 - - - - - - - - - - - - - - - - - -
CH002 U439955 Furnace Barnstead Thermolyne F30428C OFOI 1 - Chemistry Lab 22 24 30 B - X HW 208 26.4 - - - - - - - - - - - - - - - - Snorkel - -
CH003 U321524 Oven (A) VWR International LLC 1370FM OFOI 1 - Chemistry Lab 32 24 34 - B 1 X P 120 13 - - - - - - - - - - - - - - - - Snorkel - -
CH004 U321560 Oven (B) VWR International LLC 1370FM OFOI 1 - Chemistry Lab 32 24 34 - B 1 X P 120 13 - - - - - - - - - - - - - - - - Snorkel - -
CH005 U450212 Microwave Digester Milestone Inc Ethos Up OFOI 1 - Chemistry Lab 40 32 27 184 B 1 X P 230 - 2680 - - - - - - - - - - - - - -35-55 CFM
- - -Exhaust tube to be clipped into fixed duct with damper
CH006 U443399 Hydrolysis System (A) ANKOM Technologies HCL OFOI 1 - Chemistry Lab 11 16 23 - in FH 1 - P 120 10 - - - - - - X - - X - - - - - - - - -
CH007 U418003 Hydrolysis System (B) ANKOM Technologies HCL OFOI 1 - Chemistry Lab 11 16 23 - in FH 1 - P 120 10 - - - - - - X - - X - - - - - - - - -
CH028 U321703 Eberbach Shaker Eberbach Corporation E5850 OFOI 1 - Chemistry Lab 12 15 12 - B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
CH029 U436963 Digital Pulse Mixer Glas Col 099A DPM12 OFOI 1 - Chemistry Lab 17 16 17 75 B 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
CH030 Ultrasonic Cleaner Fisher Scientific FS20 OFOI 1 - Chemistry Lab 9 8 12 11 B 1 - P 120 - 143 - - - - - - - - - - - - - - - - - -
CH031 U437360 Nitrogen Evaporator Organomation Associates 5085 OFOI 1 - Chemistry Lab 12 11 33 - in FH 1 - P 120 - 500 - - - - - - - - - -from
cylinder- - - - - - -
Clean Lab
CH032 U438671 Neogen Stat-Fax (Microwell Reader) Neogen CorporationNeogen Stat-Fax 4700
OFOI 1 - Clean Lab 10 14 5 10 B 1 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
CH033 F403677 Incubator Fisherbrand 51030518 OFOI 1 - Clean Lab 19 22 37 154 B 1 - P 120 - 87 - - - - - - - - - - - - - - - - - -
Microbiological; Fisher Scientific; Isotemp; Stainless-steel exterior; Forced air; 180L; 120V; Vendor Catalog # 51030518 Incubator, Microbiological
CH034 F403676 Autoclave, Table top Scientific KinematicaSterilElite 24 15525199
OFOI 1 - Clean Lab 22 26 17 124 B 1 X P 115 - 1800 - - - - - hand filled - - - - - - - - - - - -
CH035 F403674 Biological Safety Cabinet Thermo Scientific 1375 OFOI 1 - Clean Lab 52 32 90 499 F 1 X P 120 10 - - - - - - - - - - - - - - - - - - -
Biosafety Cabinet F403674Biological safety cabinet; Sash opening, 10 in.; HEPA filter, 99.995% at 0.3&mu: With adjustable-height stand, UV lamp; width 48 in.; Exhaust volume, 328 to 361 cfm; SS package; 120 V 50/60 Hz Vendor catalog # 1375
Grinding
CH056 Wire Shelving Unit OFOI - 1 Chem & Flam Stor 36 12 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH094 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 47 22 35 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH095 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 18 20 35 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH096 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 18 20 35 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH097 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 17 17 23 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH098 Flammable Storage Cabinet OFOI 1 - Chem & Flam Stor 17 17 23 - F - - - - - - - - - - - - - - - - - - - - - - - -
Balance Room
CH057 441828 Heat Sealer A ANKOM Technologies OFOI 1 - Chemistry Lab 3 13 9 - B 1 - P 120 - 260 - - - - - - - - - - - - - - - - - -
CH058 625733 Heat Sealer B ANKOM Technologies OFOI 1 - Chemistry Lab 3 13 9 - B 1 - P 120 - 260 - - - - - - - - - - - - - - - - - -
CH059 U409290 Balance Mettler-Toledo, LLC PL-3002 OFOI 1 - Balance Room 10 15 5 - B 1 - P 120 0.3 - - - - - - - - - - - - - - - - - - -
CH045 U430398 Refrigerator 1 / Freezer C Thermo Fisher Scientific RCRF252A14 OFOI 1 - Sample Storage 36 34 69 - F 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -Refrigerator 1/Freezer C - Thermo Fisher Scientific
CH046 U430403 Refrigerator 3 Fisher 13-986-152 OFOI 1 - Sample Storage 32 31 71 200 F 1 X P 120 12 - - - - - - - - - - - - - - - - - - - Refrigerator 3 - Fisher Scienific Isotemp
CH047 U430402Refrigerator 2 / Freezer D (explosion proof)
Thermo Scientific 3551-DB OFOI 1 - Sample Storage 24 26 60 150 F - X HW 120 1.9 - - - - - - - - - - - - - - - - - - -
Refrigerator 2/Freezer D U430402Thermoscientific freezer/refrigerator used for the storage of pesticide samples
CH048 Pesticide Storage Cabinet Justrite 894504 1 - Sample Storage 43 18 65 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH049 Freezer B Frigidaire GLFh21F8HWD OFOI 1 - Sample Storage 33 31 72 F 1 - P 120 ~5 - - - - - - - - - - - - - - - - - - -
CH050 Freezer A Frigidaire LFFN15M5HWF OFOI 1 - Sample Storage 48 30 36 161 F 1 - P 120 5 - - - - - - - - - - - - - - - - - - -
CH099Top track high density wire shelving system
See specifications See specifications CFCI - 1 Sample Storage 115 60 87 - F - - - - - - - - - - - - - - - - - - - - - - - -
Chem and Flam Stor
CH054 Wire Shelving Unit OFOI - 1 Chem & Flam Stor 36 112 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH055 Wire Shelving Unit OFOI - 1 Chem & Flam Stor 42 12 72 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH036 Shop Vac OFOI 1 - Grinding 20 20 24 - F 1 - P 110 ~10 - - - - - - - - - - - - - - - - - - -
CH037 U426134 Cutting Mill Retsch GmbH SM300 OFOI 1 - Grinding 23 28 38 353 F 1 X P 120 ~15 - - - - - - - - - - - - - - - - snorkel - -
CH038 U449129 Rotor Beater Mill Retsch GmbH SR300 OFOI 1 - Grinding 18 21 21 133 B 1 X P 208 - 2500 - - - - - - - - - - - - - - - snorkel - -
CH039 U439441 Knife Mill A Retsch GmbH Grindomix GM 200 OFOI 1 - Grinding 14 11 16 23 B 1 - P 110 - ~ 1000 - - - - - - - - - - - - - - - snorkel - -
CH040 U440055 Knife Mill B Retsch GmbH Grindomix GM 200 OFOI 1 - Grinding 14 11 16 23 B 1 - P 110 - ~ 1000 - - - - - - - - - - - - - - - snorkel - -
CH041 U404669 Ultra Centrifugal Mill A Retsch GmbH ZM 200 OFOI 1 - Grinding 16 15 20 84 B 1 X P 120 - 1300 - - - - - - - - - - - - - - - snorkel - -
CH042 U440013 Ultra Centrifugal Mill B Retsch GmbH ZM 200 OFOI 1 - Grinding 16 15 20 84 B 1 X P 120 - 1300 - - - - - - - - - - - - - - - snorkel - -
CH043 Vacuum Sealer Food Saver FM 5299 OFOI 1 - Grinding 16 8 8 - B 1 - P 120 - ~150 - - - - - - - - - - - - - - - snorkel - -
CH044 Shop Vac OFOI 1 - Grinding 20 20 24 - F 1 - P 110 ~10 - - - - - - - - - - - - - - - - - - -
Sample Storage
CH008 ANKOM Dryer B ANKOM TechnologiesANKOM Rapid Dryer
OFOI 1 - Chemistry Lab 6 10 16 13 in FH 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -
CH009 450308 ANKOM Dryer C ANKOM TechnologiesANKOM Rapid Dryer
OFOI 1 - Chemistry Lab 6 10 16 13 in FH 1 - P 120 ~10 - - - - - - - - - - - - - - - - - - -
CH010 U443435 Microplate Reader BioTek Instruments, INC Epoch OFOI 1 - Chemistry Lab 12 13 8 15 B 1 - P 120 - 100 - - - - X - - - - - - - - - - - - -Bio Tek Microplate Spectrophotomer Reader U443435Microplate Spectrophotometer;
CH011 U443435Laptop computer used with Epoch Plate Reader
Hewlett-Packard (HP) ProBook 455 G4 OFOI 1 - Chemistry Lab 15 11 1 6 B 1 - P 120 - 474 - - - - X - - - - - - - - - - - - -
CH012 AA810059A Keyence B Anti Static Blower Keyence Corp. of America SJ-F2000 OFOI 1 - Chemistry Lab 12 6 8 5 B 1 - P 120 0.9 - - - - - - - - - - - - - - - - - - -
CH013 HCl Blotter ANKOM Technologies HCl Blotter H35 OFOI 1 - Chemistry Lab 12 12 7 - B - - - - - - - - - - - - - - - - - - - - - - - -Used to blot acid after acid hydrolysis of fat samples
CH014 U418003 Fat Extractor (A) ANKOM Technologies XT15 OFOI 1 - Chemistry Lab 11 18 25 97 in FH 1 - P 120 10 - - - - - - - - - - - - - - - - - - - attached to the chiller
CH015 U443398 Fat Extractor (B) ANKOM Technologies XT15 OFOI 1 - Chemistry Lab 11 18 25 97 in FH 1 - P 120 10 - - - - - - - - - - - - - - - - - - - attached to the chiller
CH016 U445334 XT Chiller for Fat Extractors Julabo USA Inc F 500 OFOI 1 - Chemistry Lab 15 16 23 82 F 1 - P 115 6 - - - - - - - - - - - - - - - - - - -
XT Chiller U445334JULABO Thermal G is a Chiller designed to work with the Fat Extractors from Ankom. It can connect to two XT units. It should be filled with water or a water/glycol mixture
CH017 GD930 Canister Vacuum Euroclean GD 930 S2 OFOI 1 - Chemistry Lab 18 15 13 F 1 - P 120 10.4 - - - - - - - - - - - - - - - - - - -
CH018 Desiccator BoekelCAT #:1324106 Serial #:181814127
OFOI 1 - Chemistry Lab 12 11 13 22 B 1 - P 115 - ~35 - - - - - - - - - - - - - - - - - -
CH019 U418002 Fiber Analyzer (A) ANKOM Technologies A2000 OFOI 1 - Chemistry Lab 35 22 40 - B 1 X P 120 15 - - - - - - -from WH
- X - - - - - - - - -Hot water from adjacent water heater; run drain line to sink
CH020 U443400 Fiber Analyzer (B) ANKOM Technologies A2000 OFOI 1 - Chemistry Lab 35 22 40 - B 1 X P 120 15 - - - - - - -from WH
- X - - - - - - - - -Hot water from adjacent water heater; run drain line to sink
CH021 Water Heater Bosch ES 2.5-1M WIR OFOI 1 - Chemistry Lab 14 11 15 16 W 1 X P 120 12 - - - - - - - X - X - - - - - - - - - Run overflow valve to sink
CH022 Water Heater Ariston GL 2.5S OFOI 1 - Chemistry Lab 14 11 15 - W 1 X P 120 12 - - - - - - - X - X - - - - - - - - - Run overflow valve to sink
CH023 AA810053A Keyence A Anti Static Blower Keyence Corp. of America SJ-5000 OFOI 1 - Chemistry Lab 12 6 8 13 B 1 - P 120 - 65 VA - - - - - - - - - - - - - - - - - -
CH024 U430407 Centrifuge Thermo Fisher Scientific Legend XTR OFOI 1 - Chemistry Lab 30 27 13 190 B 1 - P 115 11 - - - - - - - - - - - - - - - - - - 4776
CH025 U436924 Centrifuge A RESTEK 755-24 RESTEK OFOI 1 - Chemistry Lab 15 17 18 39 B 1 - P 115 2 - - - - - - - - - - - - - - - - - - -RESTEK Q- sep 3000 (A) Centrifuge U436924Cat. No: 26230; RESTEK Q-Sep 3000
CH026 U436925 Centrifuge B RESTEK 755-24 RESTEK OFOI 1 - Chemistry Lab 15 17 18 39 B 1 - P 115 2 - - - - - - - - - - - - - - - - - - -RESTEK Q-3000 (B) Centrifuge U436925Cat. No: 26230; RESTEK Q-Sep 3000
CH027 Centrifuge Fisher Scientific Micro 17R OFOI 1 - Chemistry Lab 11 17 13 - B 1 - P 120 2.6 - - - - - - - - - - - - - - - - - - -
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:53
PM
QL061
LABORATORYEQUIPMENTMATRIX
CJH
19-0056.001
CJH
FOR EQUIPMENT MATRIX GENERAL NOTES AND ABBREVIATIONS, SEE QL-060
- LC-MS Computer System OFOI 1 - ICP-MS Included above - 2 - P 120 ~5 - - - X - X - - - - - - - - - - - - -
- LC-MS Printer OFOI 1 - ICP-MS Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -
CH091 U441356 LC/MS-MS UPS APC OFOI 1 - ICP-MS 14 30 32 F 1 X P 208-241 - 14000 3 - - - - - - - - - - - - - - - - -
14000 Watt Battery Bakup UPS U44135614,000 Watt Battery Backup Uninterruptible Power Supply (UPS) and 5 tier active power conditioner with 2X external extended backup time battery cabinets for waters XEVO QD LC/MS-MS
CH092 U441357 (a) LC/MS-MS UPS APCBBP-6000-PDW-ONL-W2EBP
OFOI 1 - ICP-MS 10 23 28 F 1 X P 208-241 - 4200 3 - - - - - - - - - - - - - - - - -
4200 Watt Battery Backup UPS U441357For Water XEVO TQD LC/MS-MS; Item # BBP-6000-PDW-ONL-W2EBP
CH093 U441357 (b) LC/MS-MS UPS APCBBP-6000-PDW-ONL-W2EBP
OFOI 1 - ICP-MS 10 23 28 F 1 X P 208-241 - 4200 3 - - - - - - - - - - - - - - - - -
4200 Watt Battery Backup UPS U441357For Water XEVO TQD LC/MS-MS; Item # BBP-6000-PDW-ONL-W2EBP
Equip. Tag User ID Equipment Description Manufacturer Model No.
Fu
rnis
h &
Insta
ll
Exis
tin
g
Pu
rch
ase
New
New
Ro
om
Wid
th (
in)
Dep
th (
in)
He
igh
t (i
n)
Weig
ht
(lb
s)
Mo
un
tin
g
Lo
cati
on
Nu
mb
er
of
Ou
tlets
Ded
icate
d
Cir
cu
its
Hard
Wir
e /
Plu
g
Vo
lt
Am
p
Watt
s
Ph
as
e
Sin
gle
UN
O
Em
erg
en
cy
UP
S
Dis
co
nn
ect
Bo
x
Data
Co
ld W
ate
r
Ho
t W
ate
r
Pu
re W
ate
r
Dra
in
Co
mp
. A
ir
Nit
rog
en
Hyd
rog
en
Heliu
m
Oth
er
Gases
Exh
au
st
Dir
ec
t
Exh
au
st
Ind
irect
Tem
p /
RH
Co
ntr
ol
BT
U /
Ho
ur
Remarks
Washing
CH068 Undercounter Glassware Washer See specifications See specifications CFCI - 1 Washing 24 28 35 206 UC - X HW 208 11 - - - - X - X XFrom Tank
X - - - - - - - - - Pure water from water storage tank
CH069 Vacuum System Pump See specifications See specifications CFCI - 1 Washing 16 25 18 104 UC 1 - P 120 8 - - - - - - - - - - - - - - - - - - -
CH070 U437829 Water Purifier - RO Water Thermo Scientific Pacific RO7 OFOI 1 - Washing 13 13 24 53 W 1 - P 120 5 - - - - - -Tap, 3/4"
connection- - X - - - - - - - - -
Barnstead Pacific RO Water Purification System - Thermo Scientific U437829Barnstead Pacific RO; Order code: 50132386
CH071 U437405 Water Purifier - Ultrapure MilliporeSigma Type 1 Simplicity OFOI 1 - Washing 12 14 20 20 B 1 - P 120 ~5 - - - - - - from RO - - X - - - - - - - - -
CH072 Water Storage Tank - 60 liters MilliporeSigma TANKPE060 OFOI 1 - Washing 15 15 33 131 W - - - - - - - - - - - - - - - - - - - - - - - -Provides pure water to glassware washer
CH073 Water Pump MilliporeSigma ZWDK6L1 OFOI - 1 Washing 11 13 7 - W 1 - P 120 ~2 - - - - - - - - - - - - - - - - - - -
CH074 U445420 Fluid Bed Dryer Retsch GmbH TG 200 OFOI 1 - Washing 16 17 25 47 B 1 X P 208 - ~3,000 - - - - - - - - - - - - - - - - - -
CH075 U449302 Ultrasonic Bath Retsch GmbH UR3 OFOI 1 - Washing 17 13 20 61 B 1 X P 120 - 2000 - - - - - - - - - - - - - - - - - -
Instrument Room
CH076 U441415 HPLC Assembly Agilent Technologies Inc 1260 Infinity OFOI 1 - Instrument Room 72 30 70 F 5 - P 120 - 300 each - - - - X - - - - - - - - - - Snorkel - - On the bench along with a computer
- HPLC Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
- HPLC Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -
CH084 U438893 GC-FID Assembly Agilent Technologies Inc 7890B OFOI 1 - Instrument Room 60 30 75 F 1 X P 120 18.8 - - - - - X - - - -from
cylinder-
from cylinder
from cylinder
X - ~7700
On the bench along with 7560A Liquid Autosampler FID no tagFID Autosampler along with a compute, its own bench and a printer
- GC-FID Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
- GC-ECD Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -
ICP-MS
CH085 U434033 ICP-MS Thermo Fisher Scientific iCAP Q OFOI 1 - ICP-MS 32 29 38 850 B 1 X P 208 - 2200 - - X - X - - - - - - -from
cylinder
Argon, from
dewarX - - 2400
(2) 2.5" exhaust ducts or 1 via T connector; L6-30 plug
CH086 ICP-MS Chiller Thermo Scientific Thermo Flex 2500 OFOI 1 - ICP-MS 17 26 29 F 1 X P 208 12.9 - - - X - - - - - - - - - - - - - - 2500Thermo Scientific ThermoFlex 2500, B A 230/50 T1 IPR DCOM ACOMNeslab Thermo Flex 2500, Chiller for ICP-MS
- ICP-MS Autosampler Teledyne ASX-560 OFOI 1 - ICP-MS 23 22 30 B 1 - P 120 1 - - - X - - - - - - - - - - - - - - -
CH077 U416849 HPLC Finnigan Assembly Thermo Scientific OFOI 1 - Instrument Room 72 30 85 B 5 - P 120 - 550 each - - X - X - - - - - - - - - - Snorkel - -
On a bench with Finnigan Surveyor PDA Plus Detector, Finnigan Surveyor Autosampler Plus, Finnigan Surveyor LC Pump Plus, and Finnigan Surveyor FL Plus Detector, and a computer connected to its own printer
- HPLC Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
CH078 U446625 Combustion Analyzer Elementar CS Version OFOI 1 - Instrument Room 19 22 23 B 1 X P 120 16 - - - X - X - - - - - - - -O2 from cylinder
- Snorkel - -Rapid C Cube CS versionCombustion analyzer for determination of Carbon and Sulfur content.
- Combustion Analyzer Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
- Combustion Analyzer Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -
CH079 U446076 Protein Analyzer ElementarRapid Max N Exceed
OFOI 1 - Instrument Room 22 22 43 B 1 X P 120 16 - - - X - X - - - - - - -from
cylinderO2 from cylinder
- Snorkel - -acquity UPLC/ XEVO TRO LC-MS U433597
- Protein Analyzer Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
CH090 U433597 LC-MS Assembly Waters CorporationAcquity UPLC/ XEVO TRO
OFOI 1 - ICP-MS 72 30 72 - F - - - See below - - - - - - - - - - - -from
generator- -
Argon, from
cylinder- - - -
On the bench along with Acquity UPLC Sample Manager - FTN and Acquity H UPLC CLASS Quarternary Solvent Manager, includes a computer and its own bench with a pump underneath the bench with an Argon gas tank and tank anchor in front and has to be located next to the Peak Infinty 5010 Nitrogren Generator and has power source of "sub panel B and Panel - AS) along with three 4200 Watt Battery Backup UPS
- LC-MS Sample Manager Waters Corporation Acquity OFOI 1 - ICP-MS Included above - 1 - P 120 - 400 - - X - X - - - - - - - - - - - - -
- LC-MS Solvent Manager Waters Corporation Acquity OFOI 1 - ICP-MS Included above - 1 - P 120 - 200 - - X - X - - - - - - - - - - - - -
- LC-MS Computer System OFOI 1 - ICP-MS Included above - 2 - P 120 ~5 - - - X - X - - - - - - - - - - - - -
- UPLC Waters Corporation Acquity OFOI 1 - ICP-MS Included above - - - - - - - - - - - - - - - - - - - - - - - - -
- LC-MS Mass Spec Xevo TQD OFOI 1 - ICP-MS Included above - 1 X P 220 4.5 - - - X - X - - - - -from
generator- -
Argon from
dewar- Snorkel - -
- LC-MS Vacuum Pump Sogevac SV40-BI OFOI 1 - ICP-MS Included above 45 - 1 X P 230 - 1500 - - X - - - - - - - - - - - - - - -
- Protein Analyzer Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -
CH080 U441358 (a) UPS APCBBP-1500-PSW-ONL-W2EP
OFOI 1 - Instrument Room 6 17 9 - B 1 - P 115 - 1050 - - - - - - - - - - - - - - - - - -1050 Watt Battery Backup UPS U441358For Laboratory computers; Item # BBP-1500-PSW-ONL-W2EP
CH081 U441358 (b) UPS APCBBP-1500-PSW-ONL-W2EP
OFOI 1 - Instrument Room 6 17 9 - B 1 - P 115 - 1050 - - - - - - - - - - - - - - - - - -1050 Watt Battery Backup UPS U441358For Laboratory computers; Item # BBP-1500-PSW-ONL-W2EP
CH082 U425448 Spectrophotometer Thermo Scientific 10S-UV-Vis OFOI 1 - Instrument Room 13 15 9 19 B 1 - P 120 ~2 - - - - - X - - - - - - - - - - - - -
CH083 U419048 GC-ECD Assembly Agilent Technologies Inc 7890A OFOI 1 - Instrument Room 61 30 75 F 1 X P 120 18.8 - - - - - X - - - -from
cylinderfrom
cylinderfrom
cylinderfrom
cylinder- - X - 7681
On the bench along with 7693A Automatic Liquid Sampler U426786Automatic liquid sampler, a computer, printer and its own bench
- GC-ECD Computer System OFOI 1 - Instrument Room Included above - 2 - P 120 ~5 - - - - - X - - - - - - - - - - - - -
- GC-ECD Printer OFOI 1 - Instrument Room Included above - 1 - P 120 ~9 - - - - - X - - - - - - - - - - - - -
- ICP-MS Fore Vacuum Pump - - OFOI 1 - ICP-MS Below or behind ICP - F Powered via ICP - - - - - - - - - - - - - - - - - - - - 1100
- ICP-MS Computer System OFOI 1 - ICP-MS 24 24 24 B 3 - P 120 5 - - - X - X - - - - - - - - - - - - -
CH087 Liquid Argon Dewar OFOI 1 - ICP-MS 24 24 48 - F - - - - - - - - - - - - - - - - - - - - - - - -
CH088 U443810 ICP-OES with tableSPECTRO Analytical Instruments Inc.
76004562 OFOI 1 - ICP-MS 49 27 42 F 1 X P 230 - 2450 - - X - X - - - - - - - -Argon from
dewarX - - -
32 amp, slow blow circuit; L6-30 plug. 2 exhaust connections, 150 and 180 CFM
- ICP-OES Autosampler Teledyne ASX-560 OFOI 1 - ICP-MS 23 22 30 B 1 - P 120 1 - - - X - - - - - - - - - - - - - - -
- ICP-OES Computer System OFOI 1 - ICP-MS 24 24 24 B 3 - P 120 5 - - - X - X - - - - - - - - - - - - -
CH089 U441261 LC-MS Nitrogen Generator Peak Scientific Inc Infinity 5010 OFOI 1 - ICP-MS 20 32 46 154 F 1 X P 230 10 - - - X - - - - - -125-145
psi- - - - - - - - Condsate to be collected in container
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:56
PM
QL062
LABORATORYEQUIPMENTMATRIX
CJH
19-0056.001
CJH
FOR EQUIPMENT MATRIX GENERAL NOTES AND ABBREVIATIONS, SEE QL-060
DN
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
CHEMISTRY LAB
C106
EQ & STOR
C107
CHEM & FLAMSTOR
C106A
BALANCE RM
C106B
WASHING
C102
INSTRUMENT RM
C108
CLEAN LAB
C105A
BV
C105 SAMPLE STOR
C103
RECEIPT & DATAENTRY
C101
STOR
CS111
W
CR112
M
CR113
MECH
CM114
ICP-MS
C110GRINDING
C105B
QL120
1
QL130
1
QL140
1
PROVER STATION
120
LARGE MASS
118
RECEIPT DATAENTRY
116
MECH
M116
BV
116A
ECHELON LEVEL1 AND 2
116B
VESTIBULE
123
DOCK STAGING
121
CENTRALRECEIVING
114
MECH/BOILER
M119
DRUM STOR
117
MAIN LAB
112
ENGINE LAB
112A
COOL STOR
112B
KIT PREP
112C
SEED LAB
110
OIL/AFSTOR
112D
M
R107B
W
R107A
VEST
103A
OFFICE
102D
OFFICE
102C
OFFICE
102B
OFFICE
102A
LAB OFFICES
102
MDF
T111
JAN
J109
ELEC
115
AA
BB
CC
DD
EE
FF
GG
HH
JJ
KK
LL
MM
7
7
6
6
5
5
4
4
3
3
2
2
1
1
QL111
1
QL121
1
QL131
1
QL142
1
U
R105
VEND
104
STORAGE
118A
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:40
:59
PM
QL101
OVERALL LABPLAN
JHL
19-0056.001
CJH
1/8" = 1'-0"1
OVERALL LAB PLAN - FIRST FLOOR
N
0' 4' 8' 16' 32'
ME001ME002
ME003
LL
M
6
6
5
5
4
4
3
3
2
2
1
1
3' - 0"3' - 0"3' - 0"
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:00
PM
QL111
BUILDING #663 -ENLARGED LABEQUIPMENT PLAN- PROVERMEZZANINE
JHL
19-0056.001
CJH
1/4" = 1'-0"1
BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PROVER MEZZANINE
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
N
0' 2' 4' 8' 16'
#663
#643
#330
KEY PLAN
QL120 4QL1205
PROVER STATION
120
LARGE MASS
118
VESTIBULE
123
RECEIPT DATAENTRY
116
MECH
M116
BV
116A
ECHELON LEVEL1 AND 2
116B
STORAGE
118A
H
JJ
KK
LL
MM
7
7
6
6
5
5
4
4
3
3
2
2
1
1
LT-06
QL120 3
LS
-01
LT
-01
CA-1@ 48"AFF
12
' -
0"
HC
-1
CW
-1
66
QL1202
SG-A
11
B3604B3604S3608
W3668W3668 FW3668
B3604B3004
1
W3668
B3604F F
F W3668 W3668 W3668
F B3604 B3604 B3604
W3668 W3668
B3604 B3604
1
W3068
B3004
F
F
B3632 B3004F FB3004
1
B3032 S3608F2 B3604 B3632 B2103 F2
1 1
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:03
PM
QL120
BUILDING #663 -ENLARGED LABCASEWORK PLAN& ELEVATIONS -METROLOGY
JHL
19-0056.001
CJH
N
1/4" = 1'-0"1
BUILDING #663 - ENLARGED LAB CASEWORK PLAN - METROLOGY
0' 2' 4' 8' 16'
1/4" = 1'-0"4
EL - ECHELON LEVEL 1 & 2 - EAST
1/4" = 1'-0"5
EL - ECHELON LEVEL 1 & 2 - WEST
1/4" = 1'-0"3
EL - METROLOGY BV - EAST
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
#663
#643
#330
KEY PLAN
1/4" = 1'-0"2
EL - PROVER STATION - WEST
ME028
ME029
ME030
ME031
ME032
ME005
ME014
ME004
ME009
ME010
ME021
ME020
ME019
PROVER STATION
120
LARGE MASS
118
VESTIBULE
123
RECEIPT DATAENTRY
116
MECH
M116
BV
116A
ECHELON LEVEL1 AND 2
116B
ME008
ME012
ME026
ME027
ME007
ME013
ME006
ME017
ME018
ME011
ME015
ME016
STORAGE
118A
HH
JJ
KK
LL
MM
7
6
6
5
5
4
4
3
3
2
2
1
1
5' - 0" 6' - 0"
ME022
ME023
ME
024
ME
025
6' -
0"
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:04
PM
QL121
BUILDING #663 -ENLARGED LABEQUIPMENT PLAN- METROLOGY
JHL
19-0056.001
CJH1/4" = 1'-0"1
BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - METROLOGY
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
N
0' 2' 4' 8' 16'
#663
#643
#330
KEY PLAN
FD
FD
FD
FD
FD
FD
SS-C1
SS-C1
QL130 910
QL130
6
QL130
3
4
5
DRUM STOR
117
MAIN LAB
112
ENGINE LAB
112A
SEED LAB
110COOL STOR
112B
KIT PREP
112C
OIL/AFSTOR
112D
E E
QL130
2
QL130 11
ELEC
115
QL130 7
QL1307
EE
FF
GG
7
6
6
5
5
4
4
3
3
2
2
1
1
LE-A2
LE-A3
LE-A3
LE-A2
LE-A1
LA-B1
FH-4CFH-4C
LS-01MC-03MC-03LT-04
LT-03
LT-03
LS-01
E D
ED
V-2
5' - 0"
QL130
8
M30"
CA-1@ 48"AFF
CA-1@ 48"AFF
3' - 0"
3' -
0"
LT
-05
CA-2
8' - 0" 8' - 0" 8' - 0" 3' - 5"
LE-A2 LE-A2
LE-A2 LE-A2
3' - 5" 8' - 0" 8' - 0" 8' - 0"
EQ EQ EQ EQ EQ EQ EQ
M36"
M36"
4' - 6"
7' - 0"
5' -
0"
8' -
6"
12
LA-B1
LA-B1
LA-B1
LA-B1
LA-B1
LA-B1
LA-B1
LA-B1
LA-B1
LA-B1E DE DE DE D
E D E D E D E D E D
LA-F LA-F
LA-FLA-F
LA
-F
9
12
9
9
ED
1
3 2 3 2 3 2 3 2 3 2 3 2
5 45 4
13' - 6"
9
1
CA-1@ 48"AFF
CA-1@ 48"AFF
7' - 0"
20' - 0"
9
HC-1
LS
-01 E
W-2
HC
-1
HC-1
AVE
AVE
4' -
8"
8' - 3"
LS-01
HC-1
LA-A
9
PB
-A
191919
16
16
18
1818
1818
S3608 B3032 F2T1803
1
P4 K3611 K3611 K3611 K3611 K3611 B2431 B2402 P4B2431B2431B2431B2431
7 8 7 8 7 8 7 8 7 8
K3611 K3611 K3611 B2431 K3611 P4P4 K3611B2407 B2431B2431B2431B2431
7 8 7 8 7 8 7 8 7 8
F2406V3608S3608B3608F2406V3608B3032F F2407F2407 T3004F
1
S3608B2431
1
F L3609
J3673 J3673 J3673
K3611 L3609 F
7 8
F B3608 S3608 F3604 B3632 F
J3662
1
B1531
P4
J3673 J3673 J3673
FV3628 FV3628 FV3628K3611L3609F
7 8
B3608
J3663
15' - 6"
F
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:08
PM
QL130
BUILDING #663 -ENLARGED LABCASEWORK PLAN& ELEVATIONS -PETROLEUM ANDSEED
JHL
19-0056.001
CJH
1/4" = 1'-0"1
BUILDING #663 - ENLARGED LAB CASEWORK PLAN - PETROLEUM ANDSEED
1/4" = 1'-0"3
EL - MAIN LAB - NORTH1/4" = 1'-0"
4EL - MAIN LAB - ISLAND BENCH - SOUTH
1/4" = 1'-0"5
EL - MAIN LAB - ISLAND BENCH - NORTH
1/4" = 1'-0"6
EL - MAIN LAB - SOUTH
1/4" = 1'-0"9
EL - SEED LAB - EAST 1
1/4" = 1'-0"10
EL - SEED LAB - WEST
1/4" = 1'-0"2
EL - ENGINE LAB - SOUTH
1/4" = 1'-0"7
EL - ISLAND BENCH END
1/4" = 1'-0"11
EL - SEED LAB - EAST 2
1/4" = 1'-0"8
EL - SEED LAB - NORTH
1/4" = 1'-0"12
EL - SEED LAB - SOUTH
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
N
0' 2' 4' 8' 16'
#663
#643
#330
KEY PLAN
FD
FD
FD
FD
FD
FD
PE005
PE001
PE002
PE
055
3' -
0"
SE001
SE002
SE003
SE004
SE005
PE029 PE030
PE046
PE031
PE044
PE016
PE011
PE045
PE006
PE017
PE026
PE027
PE008 PE009 PE010
PE007
PE050PE049
PE032
PE033
PE012
PE013
PE014
PE015
PE020
PE021
PE028
PE022
PE023
PE047
PE018
PE034
PE038PE035 PE036
PE037
PE048
PE024
PE025
PE019
SE006
SE
008
SE
007
PE051
PE053
PE039
PE040
PE004
DRUM STOR
117
MAIN LAB
112
ENGINE LAB
112A
SEED LAB
110COOL STOR
112B
KIT PREP
112C
OIL/AFSTOR
112D
4' -
6"
3' - 6"
ELEC
115
PE052
EE
FF
GG
7
7
6
6
5
5
4
4
3
3
2
2
1
1
PE003
PE042
PE043
PE041
PE
054
HYDROGEN- NIC
HYDROGEN- NIC
UNASSIGNED- NIC
UNASSIGNED- NIC
OXYGEN- NIC
PE056
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:10
PM
QL131
BUILDING #663 -ENLARGED LABEQUIPMENT PLAN- PETROLEUMAND SEED
JHL
19-0056.001
CJH
1/4" = 1'-0"1
BUILDING #663 - ENLARGED LAB EQUIPMENT PLAN - PETROLEUM ANDSEED
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
N
0' 2' 4' 8' 16'
#663
#643
#330
KEY PLAN
CHEMISTRY LAB
C106
BV
C105
CLEAN LAB
C105A
GRINDING
C105B
SAMPLE STOR
C103
RECEIPT & DATAENTRY
C101
STOR
CS111
W
CR112
M
CR113
MECH
CM114
ICP-MS
C110
INSTRUMENT RM
C108
WASHING
C102
BALANCE RM
C106B
CHEM & FLAMSTOR
C106A
EQ & STOR
C107
SS-C1 SS-C1
SS-D1
EW
-1H
C-1
QL1405 6
QL140
2
QL140 3
QL14014 13
QL141 1516
QL141
18
QL14120 QL141 19
QL141
22
23 21
QL141 2425
9
FH
-4D
FH
-4B
FH
-4B
FH
-4A
FH
-6A
CA V N E
CA V E
CA V E
CA V E
CA V
CW E
LA-A
CA E
FH
-4B
CA E
FH
-4A
FH
-4B
CA V
V-1@48"V-1
@48"
CA
-1@
48"
AF
F
CA
-1@
48"
AF
F
LA-B1
LA-B1
LE-A3
LE-A3
LA-B1
LE-A3
LE-A3
LE-A3
LE-A3
LE-A3LE-A3
LE-A3
LE-A2LE-A2
LE-A2
LE-A2
LE-A2
LE-A4
LE-A4
LE-A4
LE-A1
LE-A1
LE-A4
LA-B1
MC
-02
MC
-02
UM-B
LT
-02
LT
-02
LT
-08
LT
-07
MC-01
CW E
LA-P
QL1407
5' -
0"
E
QL140
4
3' -
4"
3' -
4"
15' - 2"
UM-B
E30"
E30"
EQ
EQ
EQ
EQ
8
QL140
9 OPP
15
1313
14 15
E
EE E
2
3
2
554
2
5
3
2
2
3
2
3
2 32 3
2
3
MIN
1' -
0"
MIN
1' -
0"
MIN
1' -
0"
MIN
1' -
0"
E30"
E36"
E36"
E36"
QL14012
11
10
5' -
6"
3' -
0"
1
6" 6"
LT
-07
3' -
0"
2' -
6"
1' - 6"
1' - 6"
QL140 6
CA-1@ 48"AFF
1' -
6"
LE-A3
LE-A3
LA-S
UM-B
LS
-01
LS-01
LS
-01
LS
-01
LS
-02
PB
-A
PB-A
HC
-1
HC
-1
HC-1
LS-01
HC
-1
HC
-1
HC
-1
HC
-1
6' - 0"
1' -
0"
8' -
6"
6' -
1 1
/2"
1' - 0"
12
' -
0"
1' - 3"
10
' -
0"
1' - 3"
2' -
6"
5' -
0"
LS
-01
LS
-01
EE
EE
E
EE
LA-B1
LA
-B1
LA-B2
UM-A
5
QL906
4
QL906
LA-ALA-ALA-ALA-ALA-A
UM-C
LA-ALA-A
LA-A
EQ
EQ
4' -
8"
4' -
0"
4' -
4"
18
QL141
17
6' - 0"
9' - 6"
8' -
6"
LE-A5LE-A5LE-A5LE-A5
3' -
0"
6"
4"
LT
-07
17 17
17
LA-A
V3608 B3632 B3632 B3632 B3632
4' -
6"
F A3608 F3608A3608 T2407
S3648 A2406 F2407 A2406 F2407 A2406 F2407L2431
BASE BASEACID
7
B2431 B3608 B2431 B3608 B2431 F
1
F2 B2431 S3608 B1831 F2406 F2407 B2431 B3604 B2431 F
1
F
17
F FF F
T2407T4208T4208
141313
S3648
F L2431 K3611 L2431 K3611 L2431 F
T3008T3008F S3008 FF
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:15
PM
QL140
BUILDING #643 -ENLARGED LABCASEWORK PLAN& ELEVATIONS -CHEMISTRY
JHL
19-0056.001
CJH
1/4" = 1'-0"1
BUILDING #643 - ENLARGED LAB CASEWORK PLAN - CHEMISTRY
1/4" = 1'-0"2
EL - CHEMISTRY LAB - NORTH 11/4" = 1'-0"
3EL - CHEMISTRY LAB - EAST 1
1/4" = 1'-0"5
EL - CHEMISTRY LAB - WEST 1
1/4" = 1'-0"6
EL - CHEMISTRY LAB - EAST 2
1/4" = 1'-0"13
EL - CLEAN LAB - EAST1/4" = 1'-0"
14EL - CLEAN LAB - WEST
1/4" = 1'-0"9
EL - CHEMISTRY LAB - ISLAND END
1/4" = 1'-0"4
EL - CHEMISTRY LAB - SOUTH 1
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
1/4" = 1'-0"7
EL - CHEMISTRY LAB - WEST 2
1/4" = 1'-0"8
EL - CHEMISTRY LAB - WEST 3
1/4" = 1'-0"10
EL - CHEMISTRY BV - NORTH
1/4" = 1'-0"11
EL - CHEMISTRY BV - SOUTH
1/4" = 1'-0"12
EL - CHEMISTRY BV - WEST
ELEVATIONS CONTINUE ON NEXT SHEET
N
0' 2' 4' 8' 16'
#663
#643
#330
KEY PLAN
1
14' - 6"
1
F2 V3608 F Q2401 S3608 B1531 F2
777
1010
A2406 F2407 S3608 F2B2131B3632K3611B3632
1 717
F S3608 B1831
1
T3608 F T4208 T4208 FF T3608F F
A2406 F2407
1
F
17
1
S3608 F2
15' - 0"
J3663 J3663 J3663
EQEQ
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:18
PM
QL141
BUILDING #643 -ENLARGED LABELEVATIONS -CHEMISTRY
JHL
19-0056.001
CJH
1/4" = 1'-0"15
EL - GRINDING - EAST1/4" = 1'-0"
16EL - GRINDING - WEST
1/4" = 1'-0"18
EL - WASHING - NORTH
1/4" = 1'-0"19
EL - INSTRUMENT RM - EAST
1/4" = 1'-0"20
EL - INSTRUMENT RM - WEST
1/4" = 1'-0"21
EL - STOR. - EAST1/4" = 1'-0"
22EL - STOR. - SOUTH
1/4" = 1'-0"23
EL - STOR. - WEST
1/4" = 1'-0"24
EL - ICP-MS - EAST 1/4" = 1'-0"25
EL - ICP-MS - WEST
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
1/4" = 1'-0"17
EL - CHEM & FLAM STOR - NORTH
0' 2' 4' 8' 16'
CHEMISTRY LAB
C106
BV
C105
CLEAN LAB
C105A
GRINDING
C105B
SAMPLE STOR
C103
RECEIPT & DATAENTRY
C101
STOR
CS111
W
CR112
M
CR113
MECH
CM114
ICP-MS
C110
INSTRUMENT RM
C108WASHING
C102
BALANCE RM
C106B
EQ & STOR
C107
(BELOW)
CH016
CH080
CH081
CH091
CH092
CH093
CH090
CH083CH084
CH076
CH008
CH009
CH014
CH015
CH019
CH020
CH013
CH057
CH058
CH006
CH007
CH070
CH010
CH035
CH027
CH037
CH029
CH028
CH005CH003 CH004
CH050
CH049
CH002
CH017
CH082
CH077
CH085
CH023 CH012
CH039
CH040
CH011
CH059 CH060
CH061
CH031
CH032
CH089
CH062 CH063
CH078
CH045
CH047
CH046
CH025
CH026
CH074CH075
CH038
CH030
CH024
CH088
CH086
CH041
CH042
CH001
CH043
CH071
CH018
CH034
CH033
CH048
CH022
CH021
NITROGEN- NIC
CH073
CH079
CH036
CH044
CH066 CH067
CH065CH064
CH069 CH068
(BELOW)
CH072
CH087
5
QL906
4
QL906
COMPRESSEDAIR -NIC
COMPRESSEDAIR -NIC
HELIUM- NIC
HELIUM- NIC
UNASSIGNED- NIC
NITROGEN- NIC
HYDROGEN- NIC
HYDROGEN- NIC
OXYGEN- NIC
HELIUM- NIC
OXYGEN- NIC
UNASSIGNED- NIC
HELIUM- NIC
UNASSIGNED- NIC
ARGONDEWAR
UNASSIGNED- NIC
UNASSIGNED- NIC
UNASSIGNED- NIC
ARGON- NIC
COMPRESSEDAIR -NIC
NITROGEN- NIC
HELIUM- NIC
COMPRESSEDAIR -NIC
OXYGEN- NIC
HYDROGEN- NIC
HYDROGEN- NIC
ARGON- NIC
CARBONDIOXIDE
CH099
CH054 CH055 CH056
CH094CH095
CH096
CH097
CH098
CHEM & FLAMSTOR
C106A
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:20
PM
QL142
BUILDING #643 -ENLARGED LABEQUIPMENT PLAN- CHEMISTRY
JHL
19-0056.001
CJH
1/4" = 1'-0"1
BUILDING #643 - ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY
LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES
NO. NOT ALL KEYED NOTES USED ON ALL SHEETS, SEE PLANS AND ELEVATIONS
1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC
2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC
3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC
4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC
5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC
6 OVERHEAD CORD REEL - SEE ELEC
7 DUPLEX ELECTRICAL OUTLET - SEE ELEC
8 DUPLEX DATA OUTLET - SEE ELEC
9 FLOOR DRAIN - SEE PLUMBING
10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING
11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL FOR BASE AND ARCHFOR COUNTERTOP
12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC
13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR
14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR
15 EXISTING FLOOR DRAIN TO REMAIN
16 COAT HOOKS - SEE ARCH
17 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
18 EXHAUST DUCT - SEE MECHANICAL
19 SOLID SURFACE COUNTERTOP - SEE ARCH SPECIFICATIONS
N
0' 2' 4' 8' 16'
#663
#643
#330
KEY PLAN
CT
R T
OP
H4
" U
NO
1"
SE
E E
LE
CC
AB
H
SE
E C
SW
K T
YP
E
3" NOM
1" UNOUTILITY SPACE
CAB D
CTR TOP D
4"
NO
M
CEILING (SEE ARCH)
WALL CAB
BACKING, TYP
UCL, WHERE INDICATED
RACEWAY (SEE ELEC)
SEALANT, TYP.
SPLASH
CTR TOP
BASE CAB
UTILITY SPACEFRAMING (DASHED)@ 48"O.C. MAX
1" UNO1" UNO
CAB D
UTILITY SPACE
CAB D
CTR TOP D
BENCH TOP ITEMS (DASHED),WHERE OCCURS
CTR TOP
BASE CABINETS
UTILITY SPACEFRAMING (DASHED)@ 48" O.C. MAX
APPLIED BASE,(SEE ARCH)
CT
R T
OP
H
CAB D
SLOPED TOP (DASHED) WHERE INDICATED
APPLIED BASE, (SEE ARCH)
1X WD CLEAT
CT
R T
OP
H
CTR TOP D
CAB D 1" UNO
1x WD CLEAT
ABOVE CTR ITEMS (DASHED), WHERE INDICATED
BACKING, TYP.
APERIMETER
BISLAND / PENINSULA
CPERIMETER - CTR TOP <30" D
PTN (SEE ARCH)
FUMEHOOD
CABINET VENT OUTLET(S) PER MFR, W/ THREADED PE/PP PIPE CONNECTION
CORROSIVES CABINET
CABINET VENT DUCTED DIRECT TO LAB EXHAUST SYSTEM (DASHED), WHERE INDICATED(SEE MECHANICAL)
PTN ORADJOINING UMBILICAL
VERIFY REQ'D SETBACKW/ FH MFR
CABINET VENT OUTLET(S) PER MFR, W/ THREADED PE/PP PIPE CONNECTION
CORROSIVES CABINET
CABINET VENT DUCTED DIRECT TO LAB EXHAUST SYSTEM (DASHED), WHERE INDICATED(SEE MECHANICAL)
PTN ORADJOINING UMBILICAL
CT
R T
OP
H
CTR TOP D
WO
RK
SU
RF
AC
E H
APERIMETER @ FUME HOOD
BPERIMETER
(ISLAND / PENINSULA SIM.) (ISLAND / PENINSULA SIM.)
CLNG (SEE ARCH)
CABINET VENTOUTLETS, CAPPED UNO
FLAMMABLE LIQUID / HAZARDOUS MATERIALCABINET
FUME HOOD (DASHED), WHERE INDICATED
BACK PANELS
ADJOINING CONSTRUCTION BEYOND
AP
RO
N
UTILITY SPACE CAB D 1" UNO.
UTILITY SPACE CLOSURE PANEL
ADJOINING CONSTRUCTION BEYOND
CLOSURE PANEL CAB D 1" UNO.
PTN (SEE ARCH)
CTR TOP D
VARIES 12"
KNEESPACE W
CT
R T
OP
H
18
" U
NO
.
CT
R T
OP
H V
AR
IES
4"
AEL - KNEE SPACE W/ BACK PANEL
BSECTION - BACK PANEL
CSECTION - OPEN TO PTN
REMOVABLE BACK PANEL (DASHED)
FIXED BACK PANEL
FIXED BASE PANEL
POWER / DATA WHERE INDICATED
UNSUPPORTED CTR TOP OR CTR TOP W/ APRON, PER CASEWK TYPES
UNSUPPORTED CTR TOP OR CTR TOP W/ APRON, PER CASEWK TYPES
CTR TOP D
B
C
PTN (SEE ARCH)
UNSUPPORTED CTR TOP OR CTR TOP W/ APRON, PER CASEWK TYPES
SHELF MATERIAL
REMOVABLE SHELF EDGE RETAINER BAR
HORIZONTAL RAIL COVERS, TYP
HORIZONTAL RAIL (UPPER)
SINGLE VERTICAL RAIL
HORIZONTAL RAIL
(LOWER)
RA
IL H
D
HORIZ RAILS, TOP AND BOTTOM
VERT WALL RAIL
ADJ SHELF, TYP
BACKING PER MFR, TYP
SE
E C
SW
K T
YP
E
OUTER SHELF BRACKETS, TYP
DOUBLE VERTICAL RAIL
AT ADJ SHELVING UNITS
AABOVE CTR
CISOMETRIC
CT
R T
OP
H4
9"
NO
M.
D 6" 6" D
ISLAND/PENINSULACABINETS
BASE PLATE UCL, WHERE INDICATED
REINFORCE CTR TOP PER MFR FOR SUPPORT/ ANCHORING OF BENCTOP UPRIGHT FRAMES
VERTICAL SERVICE PEDESTAL (DASHED), WHERE INDICATED
INNER SHELF, TYP.
OUTER SHELF, TYP.
BENCHTOP UPRIGHT FRAME
INVERTED TOP SHELF WHERE INDICATED (NOT SHOWN)
TOP FRAME / SHELF
OPEN
ISLAND / PENINSULA8 3/4" NOM.
D
PERIMETER CABINETS
UCL, WHERE INDICATED
REINFORCE CTR TOP PER MFR FOR SUPPORT/ ANCHORING OF BENCTOP UPRIGHT FRAMES
BASE PLATE
INNER SHELF, TYP.
OUTER SHELF, TYP.
WALL BENCHTOP UPRIGHT FRAME
INVERTED TOP SHELF WHERE INDICATED (NOT SHOWN)
TOP FRAME / SHELF
AISLAND / PENINSULA
BPERIMETER
CA
B H
SLOPED TOP (DASHED) WHERE INDICATED
TALL CABINET
BACKING PER MFR
CAB D
ADJOINING CONSTRUCTION (BEYOND)
1" UNO.
UTILITY SPACE (BEYOND) WHERE OCCURS. CLOSURE PANEL PER CASEWORK TYPES
ADJOINING CONSTRUCTION (BEYOND)
CTR TOP D
EQUIP SPACE
CT
R T
OP
H
BEL - ISLAND / PENINSULA
CSECTION - ISLAND / PENINSULA
ASECTION - PERIMETER
BACK PANEL
UTILITIES VARY -SEE LAB PLANS
CTR TOP
UTILITY SPACE (BEYOND) W/ CLOSURE PANEL
CTR TOP D
C
PTN (SEE ARCH)
CTR TOP
UC EQUIP (DASHED)
ISLAND / PENINSULA
UC EQUIP (DASHED)
1" UNO CAB D
UTILITYSPACE
EQUIP SPACE
AEL - CAB INT - PANEL OVER DOOR
BSECTION - PANEL OVER DOOR
CAB W
CT
R T
OP
H
B
CEILING(SEE ARCH)
2-4" DIA CABINET EXH DUCT COLLAR(S)
EXHAUST DUCT (DASHED) WHERE OCCURS, SEE MECH
PTN(SEE ARCH)
120 V DUPLEX, UNO (CONTROLLED BY SWITCH ABOVE CAB DOOR)
INSULATED CABINET INTERIOR AND DOOR
UTILITY SPACE CAB D 1" UNO
CTR TOP DSWITCH (CONTROLS CABINET DUPLEX)
FLUSH PANEL
CT
R T
OP
D
SEE PLAN AND ELEVATION
KNEE SPACE,UNDERCOUNTER
4" 4"
1' -
0"
4" GROMMET, SEE PLAN FOR LEFT OR RIGHT SIDE LOCATION
FOR FILLER PANEL, CENTER GROMMET ON PANEL
SPLASH
CTR TOP
CT
R T
OP
D
SEE ELEVATION FOR WIDTH
FILLER PANEL
EQ EQ
1' -
0"
SPLASH
CTR TOP
FO
R H
EIG
HT
SE
E E
LE
VA
TIO
N
APPLIED BASE (SEE ARCH)
WATER FITTING
LAB SINK
PTN (SEE ARCH)
PANEL
SEE MEP FOR PLUMBING CONNECTION
SEE MEP FOR PLUMBING CONNECTION
4' -
0"
CE
ILIN
G H
EIG
HT
(S
EE
AR
CH
)
DRIP TRAY
CENTER PEG BOARD ABOVE SINK, UNO
TYP, UNO
2' - 0"
TY
P, U
NO
2' -
6"
8' -
0"
PEG BOARD
RECESSED SAFETY
SHOWER / EYE WASH
4' -
0"
PULL HANDLE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:22
PM
QL901
TYPICALLABORATORYCASEWORK
JHL
19-0056.001
CJH
1/2" = 1'-0"2
SECTION - TYP BASE / WALL CABINETS1/2" = 1'-0"
3SECTION - TYP CORROSIVES CABINETS
1/2" = 1'-0"9
SECTION - TYP FLAM / HAZ CABINETS
1/2" = 1'-0"4
SECTION - TYP KNEE SPACE1/2" = 1'-0"
5SECTION - ADJUSTABLE WALL RAIL SHELVING SYSTEM
1/2" = 1'-0"7
SECTION - BENCH TOP UPRIGHTS
1/2" = 1'-0"8
SECTION - TYP TALL CABINET
1/2" = 1'-0"6
SECTION - TYP EQUIPMENT SPACE
1/2" = 1'-0"10
SECTION - TYP VACUUM PUMP CABINET1/2" = 1'-0"
12GROMMET DETAIL
1/2" = 1'-0"11
SECTION - SINK CAB
1/2" = 1'-0"1
TYPICAL MOUNTING HEIGHTS
WORK SURFACE
4" H NOM TABLE FRAME
2" SQ NOM TABLE LEGS
LOWER H FRAME, LEG RAIL & OFFSET STRETCHER
BEL - FRONT/BACK
APLAN
CTYP
W
TYP UNO1" OVERHANG
DH
BTYP
CEL - SIDES
BACK
FRONT
LE
FT
CT
R T
OP
T
LEVELING DEVICES OR CASTERS AS SCHEDULED
WORK SURFACE
TABLE FRAME
TABLE LEGS
RIG
HT
WORK SURFACE
3" H NOMHVY DUTY TABLE FRAME
2" SQ NOM TABLE LEGS
LOWER U FRAME, LEG RAILS & BACK STRETCHER
BEL - FRONT/BACK
APLAN
CTYP
W
TYP UNO1" OVERHANG
DH
BTYP
CEL - SIDES
BACK
FRONT
LE
FT
CT
R T
OP
T
LEVELING DEVICES OR CASTERS AS SCHEDULED
WORK SURFACE
HVY DUTY TABLE FRAME
TABLE LEGS
RIG
HT
WORK SURFACE
CANTILEVER TABLE FRAME
CART FRAME
BEL - FRONT
APLAN
CTYP
W
D
H (
WK
SU
RF
AC
E)
H (
FR
AM
E)
B
CEL - RIGHT
BACK
FRONT
LE
FT
CT
R T
OP
T
CASTERS, TYPE AS SCHEDULED
WORK SURFACE
CANTILEVER TABLE FRAME
HANGING RAIL
CART FRAME
RIG
HT
1"
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:22
PM
QL902
LABORATORYTABLE ANDMOBILE CARTDETAILS
JHL
19-0056.001
CJH
1/2" = 1'-0"1
DETAIL - STANDARD METAL TABLE FRAME - TYPE A1/2" = 1'-0"
2DETAIL - HEAVY DUTY METAL TABLE FRAME - TYPE B
1/2" = 1'-0"3
DETAIL - STANDARD DUTY MOBILE CART
W D
CLG(SEE ARCH)
PTN
CABINET ANCHOR KIT PER MFR (T&B)
BACKING,TYP
SPEC PURPOSESAFETY CABINET
AELEVATION
BSECTION
H
B
LEV CLG ESCUTCHEON
LEVSWIVEL
LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"
LEV HOOD - CLEAR DOME HOOD;NOMINAL 14" DIAMETER
10"
NO
M
6' -
2"
CE
ILIN
G H
(SE
E A
RC
H)
FLOOR
6"
1' -
0"
1' -
0"
LEV CLG BRACKET
EXH DUCT - SEE MECH
LEV DUCT CONNECTION
LEV LOWER ANCHOR PLATE
LEV UPPER ANCHOR PLATE
SCF SUPPORT FRAMINGSEE ARCH
CLG - SEE ARCH
STRUCTURE ABOVE
FACE OF PTN(SEE ARCH)OR LAB CSWK (SEE LAB PLANS)
SLOTTED CHANNEL FRAMING
GAS CYLINDER BRACKET
NOM 9" DIA GAS CYLINDER,VERIFY W/ OWNER (OFOI)
TOP & BOT BRACKETS & SCF ASSEMBLY (SAFETY STRAPS & CHAINS NOT SHOWN)
NOM 1'-0" OC VERIFY W/ BRACKET MFR
APLAN
BELEVATION
B
1' - 0" 1' - 0"
1' -
3"
AL
IGN
TO
P O
F B
RA
CK
ET
3
' -
0"
CSECTION
BACKING, TYP.
1" MIN TYP
# OF BRACKETS VARIES -SEE PLAN
C
MOUNT BRACKET TO SLOTTED CHANNEL FRAMING
PTN
Z-ANCHORBRACKET @24" OC MAX
BACKING
GAS CYLINDERRACK TUBE FRAME
CYLINDERVERIFY W/ OWNER (OFOI)B
APLAN
BELEVATION
CSECTION
# OF RACK MODULESVARIES, SEE PLAN
12" TYP
RACKTUBING
RA
CK
TU
BIN
G
1-3
CY
LIN
DE
RS
DE
EP
, S
EE
PL
AN
2' -
6"
RACK TUBING
OPEN
OPEN
OP
EN
OP
EN
1' -
3"
FLOOR ANCHORS
SAFETY CHAINS
GAP
C
3' - 0"RACK
TUBINGRACK
TUBING
3' -
0" RA
CK
TU
BIN
G
# OF RACK MODULES VARIES (2 MAX) SEE PLAN
RACK TUBE FRAME
SAFETY CHAINS
DEWAR/TRANSPORTER
APLAN
B
3' -
4"
2' -
0"
BELEVATION
CSECTION
C
OPEN
OPEN
OPEN
OPEN
PTN(SEE ARCH)
Z-ANCHOR BRACKETS, 2 PER MODULE
BACKING
SAFETY CHAINS
FLOOR ANCHORS
RACK TUBING & STIFFENERS
LEV CLG ESCUTCHEON
LEV SWIVEL
LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 60"
LEV HOOD - ROUND METAL HOOD;NOMINAL 10" DIAMETER
10"
NO
M
7' -
10
"CE
ILIN
G H
(SE
E A
RC
H)
FLOOR
6"
1' -
0"
1' -
0"
LEV CLG BRACKET
EXH DUCT - SEE MECH
LEV DUCT CONNECTION
LEV LOWER ANCHOR PLATE
LEV UPPER ANCHOR PLATE
SCF SUPPORT FRAMINGSEE ARCH
CLG - SEE ARCH
STRUCTURE ABOVE
LEV CLG ESCUTCHEON
LEV SWIVEL
LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 60"
LEV HOOD - CLEAR DOME HOOD;NOMINAL 14" DIAMETER
10"
NO
M
7' -
10
"CE
ILIN
G H
(SE
E A
RC
H)
FLOOR
6"
1' -
0"
1' -
0"
LEV CLG BRACKET
EXH DUCT - SEE MECH
LEV DUCT CONNECTION
LEV LOWER ANCHOR PLATE
LEV UPPER ANCHOR PLATE
SCF SUPPORT FRAMINGSEE ARCH
CLG - SEE ARCH
STRUCTURE ABOVE
CLG(SEE ARCH)
AELEVATION - FRONT
BELEVATION - SIDE
B
RAMP
HANDEL
GLASS DOORS (BOTH SIDES)
PARTITION(SEE ARCH)
CH
AM
BE
RH
EIG
HT
AIR FILTER BEHIND REMOVABLE PANEL
WIDTH
CHAMBER
VENTS
FRAMES MOUNTED TO PARTITION
BSECTION
CHAMBERDEPTH
D
CLG(SEE ARCH)
ANCHORCAB PERMFR
AELEVATION
BSECTION
H
EXHAUST DUCT -SEE MECH
B
FIRE PROTECTION
PLUMBING - SEE MEP
W
VENT
HANDLE
ACCESS PANEL
WINDOW MANIFOLD
CINSIDE OF CABINET
SPRINKLER HEAD
GAS CYLINDER
CYLINDER RESTRAINT
LEV CLG ESCUTCHEON
LEVSWIVEL
LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"
LEV HOOD - ROUND METAL HOOD;NOMINAL 10" DIAMETER
10"
NO
M
7' -
10
"CE
ILIN
G H
(SE
E A
RC
H)
FLOOR
6"
1' -
0"
1' -
0"
LEV CLG BRACKET
EXH DUCT - SEE MECH
LEV DUCT CONNECTION
LEV LOWER ANCHOR PLATE
LEV UPPER ANCHOR PLATE
SCF SUPPORT FRAMINGSEE ARCH
CLG - SEE ARCH
STRUCTURE ABOVE
LEV CLG ESCUTCHEON
LEVSWIVEL
LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"
LEV HOOD - SQUARE HOOD;NOMINAL 14" X 12"
10"
NO
M
7' -
10
"CE
ILIN
G H
(SE
E A
RC
H)
FLOOR
6"
1' -
0"
1' -
0"
LEV CLG BRACKET
EXH DUCT - SEE MECH
LEV DUCT CONNECTION
LEV LOWER ANCHOR PLATE
LEV UPPER ANCHOR PLATE
SCF SUPPORT FRAMINGSEE ARCH
CLG - SEE ARCH
STRUCTURE ABOVE
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:24
PM
QL903
LABORATORYDETAILS -ACCESSORIES
JHL
19-0056.001
CJH
1/2" = 1'-0"4
SPECIAL PURPOSE SAFETY CABINET - FLAMMABLE/HAZARDOUS
1/2" = 1'-0"5
SECTION - LOCAL EXHAUST VENT TYPE-A1 (CEILING)
1/2" = 1'-0"1
GAS CYLINDER BRACKET1/2" = 1'-0"
2GAS CYLINDER RACK TYPE A
1/2" = 1'-0"3
GAS CYLINDER RACK TYPE-C (DEWAR/TRANSFER)
1/2" = 1'-0"6
SECTION - LOCAL EXHAUST VENT TYPE-A2 (CEILING)1/2" = 1'-0"
8SECTION - LOCAL EXHAUST VENT TYPE-A4 (CEILING)
1/2" = 1'-0"11
PASS THRU - FLOOR MOUNTED1/2" = 1'-0"
10GAS CYLINDER CABINET
1/2" = 1'-0"7
SECTION - LOCAL EXHAUST VENT TYPE-A3 (CEILING)
1/2" = 1'-0"9
SECTION - LOCAL EXHAUST VENT TYPE-A5 (CEILING)
CE
ILIN
G H
CEILING SHROUD
CEILING (SEE ARCH)
FIXEDPANEL
C
BFRONT AND SIDE ELEVATION (SOUTH AND EAST)
CSECTION
2"
2"
+/-
INTERNAL FRAMING AS NEEDED
APLAN
B
B
Z CLAMPS OR SIMILAR TO ALLOW FOR PANEL REMOVAL
UTILITIES FROM ABOVE CEILING
14"
14"
2' -
2"
10"
UMBILICAL, REMOVABLEPANEL
COUNTERTOP AND CASEWORK, SEE PLANS AND ELEVATIONS
AFFIX TO FLOOR
OPEN BELOW COUNTER
BB
REMOVABLEPANEL
C
ISOMETRIC
2' -
8"
10"
BFRONT
CSIDE
APLAN
C
B
81 3/4"
FIELD VERIFY DIMENSIONS PRIOR TO FABRICATION
29" 2' -
11
"
ADJACENT COUNTERTOP AND CASEWORK, SEE PLAN AND ELEVATIONS
MATCH TOE KICK CUT OUT OF ADJACENT CASEWORK
LOCATE SPLASH GUARD AGAINST SIDES OF ADJACENT CASEWORK, UNDER COUNTERTOP OVERHANG
AFFIX SPLASH GUARD TO WALL AND FLOOR AS NEEDED
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:25
PM
QL904
LABORATORYDETAILS -ACCESSORIES
Approver
19-0056.001
Author
1" = 1'-0"3
UMBILICAL TYPE A
2SPASH GUARD ISOMETRIC
1" = 1'-0"1
SPASH GUARD
CE
ILIN
G H
CEILING SHROUD
CEILING (SEE ARCH)
UMBILICAL, REMOVABLEPANEL
C
BFRONT AND SIDE ELEVATION (SOUTH AND EAST)
CSECTION
2"
2"
+/-
B
36"
UMBILICAL FIXED PANEL
INTERNAL FRAMING AS NEEDED
APLAN
B
B
Z CLAMPS OR SIMILAR TO ALLOW FOR PANEL REMOVAL
UTILITIES FROM ABOVE CEILING
8"
8"
1' -
8"
5"
UMBILICAL, REMOVABLEPANEL
COUNTERTOP AND CASEWORK BELOW, SEE PLANS AND ELEVATIONS
AFFIX TO COUNTERTOP
CE
ILIN
G H
CEILING SHROUD
CEILING (SEE ARCH)
UMBILICAL, REMOVABLEPANEL
C
BFRONT ELEVATION (WEST)
CSECTION
4"
2"
2"
+/-
D D
DSIDE ELEVATION (NORTH AND SOUTH)
6"
36"
36"
UMBILICAL FIXED PANEL
INTERNAL FRAMING AS NEEDED
AFFIX UMBLICAL TO FLOOR
22"
EBACK ELEVATION (EAST)
APLAN
B E
D
D
18"
7"
7"
7"
7"
7"
DUPLEX DATA OUTLETS
DUPLEX 120V OUTLETS
BLANK PANEL FOR FUTURE USE
Z CLAMPS OR SIMILAR TO ALLOW FOR PANEL REMOVAL
POWER AND DATA FROM ABOVE CEILING
26"
8"
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:26
PM
QL905
LABORATORYDETAILS -ACCESSORIES
Approver
19-0056.001
Author
1" = 1'-0"1
UMBILICAL TYPE B
1" = 1'-0"2
UMBILICAL TYPE C
2-FITTING GROUP1-FITTING GROUP
/SIDEOF CABINET
3-FITTING GROUP
ISLA
ND
/P
EN
INS
ULA
BACK SPLASH @ PERIMETER CTR TOP (DASHED)
SERVICE FITINGS
/SIDEOF CABINET
/SIDEOF CABINET
3"
SP
LA
SH
5 1/2" 5 1/2" 5 1/2"
PE
RIM
ET
ER
CT
R T
OP
D
ISL
AN
D /
PE
NIN
SU
LA
7"
ELEC / DATA PEDESTAL
/SIDEOF CABINET
FRONT EDGEOF CTR TOP
6"CUP SINK
CUP SINK - PERIMETER
7" 7"
/SIDEOF CABINET
FITTING HANDLES
CUP SINK -CENTERED ON ISLAND/PENINSULA
SINK
PW SERVICE FITTING
TYPES WHERE OCCURS, SEE LAB PLANS
SPLASH
CTR TOP
CL
SIN
K D
NO
M.
4 1
/2"
CT
R T
OP
D
SERVICES
SINK
3"
10" 10"
SINK BASE CAB
SINK W UNOEQ
UNOEQ
H/C
EW
FLOOR
H -
SE
E P
LA
N
SEE PLAN
SERVICE FITTING
UMBILICAL TO CONCEAL UTILITIES RUNNING FROM THE CEILING TO THE UTILITY CHASE BEHIND THE CASEWORK
STANDING HEIGHT CASEWORK, COUNTERTOP 36" AFF
SITTING HEIGHT CASEWORK, COUNTERTOP 30" AFF
UTILITY CHASE BETWEEN CASEWORK
COUNTERTOPCOUNTERTOP
CUSTOM HEIGHT BACKSPLASH TO FILL BETWEEN THE 30" AND 36" COUNTERTOP
ADD FRAMING AS NEEDED TO SUPPORT CUSTOM BACKSPLASH AND COUNTERTOPS
FLOOR, SEE ARCH
CEILING, SEE ARCH
ACCESS PANEL, SEE UMBILICAL DETAIL
UMBILICAL TO CONCEAL UTILITIES RUNNING FROM THE CEILING TO THE UTILITY CHASE BEHIND THE CASEWORK
STANDING HEIGHT CASEWORK, COUNTERTOP 36" AFF
UTILITY CHASE BETWEEN CASEWORK AND FINISH PANEL
COUNTERTOP
ADD FRAMING AS NEEDED TO SUPPORT FINISH PANEL AND COUNTERTOP
FLOOR, SEE ARCH
CEILING, SEE ARCH
METAL FINISH PANEL
1"
ACCESS PANEL, SEE UMBILICAL DETAIL
W
CUP SINK, WHERE OCCURS
NO
M 3
6"
D
APLAN
B
UPPER BYPASS(DASHED) PERHOOD VENTILATIONTYPE
CEILING ENCLOSURE
CEILING (SEE ARCH)
DUCT AND TRANSITION(SEE MECH)
BASE CABINETS (SEE ELEV)C
TR
T
OP
H
36"
HOOD WORK SURFACE / FLUSH AIRFOIL
SASH
ACCESS PANEL OR REMOVABLE PANEL
4"
CL
G H
(S
EE
A
RC
H)
54
" N
OM
H
UTILITY SERVICES (SEE PLAN)
BELEVATION
PER MFR,TYP
PE
R M
FR
W
NO
M 3
6"
D
APLAN
B
UPPER BYPASS(DASHED) PERHOOD VENTILATIONTYPE
CEILING ENCLOSURE
CEILING (SEE ARCH)
DUCT AND TRANSITION(SEE MECH)
SUPPORT STAND
CT
R
TO
P H
30" HOOD WORK SURFACE /
FLUSH AIRFOIL
SASH
ACCESS PANEL OR REMOVABLE PANEL
4"
CL
G H
(S
EE
A
RC
H)
54
" N
OM
H
UTILITY SERVICES (SEE PLAN)
BELEVATION
1
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
REVISIONS
SHEET NO
DRAWING NAME
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
10/12/2020
10
/9/2
02
0 4
:41
:27
PM
QL906
LABORATORYDETAILS -SERVICES ANDFUME HOODSECTIONS
JHL
19-0056.001
CJH
1/2" = 1'-0"3
PLAN - DECK MOUNTED FITTING LOCATIONS1/2" = 1'-0"
1TYPICAL SINK SERVICE FITTING PLAN
1/2" = 1'-0"2
EL - WALL FITTING LOCATIONS
1/2" = 1'-0"5
CHEMISTRY MAIN LAB - EAST ISLAND BENCH1/2" = 1'-0"
4CHEMISTRY MAIN LAB - WEST ISLAND BENCH
1/2" = 1'-0"6
FUME HOOD - GENERAL PURPOSE1/2" = 1'-0"
7FUME HOOD - GENERAL PURPOSE - SITTING HEIGHT