MAHKAMA AGUNG PANITIA PENGADAAN BARANG DAN JASA PENGADILAN AGAMA KABUPATEN KONAWE TAHUN ANGGARAN 2011 Sekretariat : Jl. Inolobunggadue II No. 830 Unaaha KOREKSI ARITMATIK / EVALUASI HARGA RENCANA ANGGARAN BIAYA PEKERJAAN : REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABU LOKASI : KECAMATAN UNAAHA KABUPATEN KONAWE TAHUN ANGGARAN : 2011 NO. URAIAN PEKERJAAN SAT VOLUME HARGA PERKIRAAN SENDIRI 1. CV. RAFIL JAYA 2. CV. LALOMBONDA 3. CV. SIN HARGA SAT. JML. HARGA HARGA SAT. JML. HARGA % HARGA SAT. JML. HARGA % HARGA SAT. ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) 1 2 3 4 5 6 7 8 9 10 11 12 13 A PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi & Pengukuran Ls 1.00 ### 500,000.00 ### 425,000.00 ### ### 400,000.00 ### ### 2 Papan Nama Proyek Ls 1.00 ### 250,000.00 ### 250,000.00 ### ### 300,000.00 ### ### 3 Pembuatan Direksi Keet dan Gudang Ls 1.00 ### ### ### ### ### ### ### ### ### 4 Penyediaan Air kerja & P3K Ls 1.00 ### 300,000.00 ### 250,000.00 ### ### 300,000.00 ### ### 5 Pemb. Laporan, Dokumentasi & Asbuilt Dra Ls 1.00 ### ### ### ### ### ### ### ### ### Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah B PEKERJAAN PENATAAN HALAMAN DAN PENIMBUNAN 1 Pek. Timbunan Tanah Didatangkan M3 ### 90,750.00 ### 89,710.00 ### ### 88,460.00 ### ### 89,360.00 2 Pek. Kerb Beton Casten M3 7.98 ### ### ### ### ### ### ### ### ### 3 Pek. Plesteran 1 : 3 Cerb beton Casten t M2 ### 46,219.50 ### 44,742.20 ### ### 44,171.60 ### ### 45,561.00 4 Acian dengan Air Semen M2 ### 25,690.00 ### 24,788.75 ### ### 24,360.00 ### ### 25,161.25 5 Pengecetan Cerb Beton Casten M2 ### 18,783.10 ### 18,592.10 ### ### 18,585.00 ### ### 18,720.60 6 Pek. Pintu Teralis Besi Ls 2.00 ### ### ### ### ### ### ### ### ### Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah C PEKERJAAN REHABILITASI KANTOR I PEKERJAAN BETON , DINDING DAN PLESTERAN 1 Pek. Kolom Beton 20/20 cm, 1pc : 2psr : M3 0.24 ### ### ### ### ### ### ### ### ### 2 Pek. Balok Beton 20/30 cm, 1pc : 2psr : M2 0.30 ### ### ### ### ### ### ### ### ### 3 Pas. Dinding Batu Bata 1 : 5 M2 17.50 90,166.50 ### 85,191.00 ### ### 82,878.00 ### ### 87,865.00 4 Pek. Plesteran Dinding 1 : 5 M2 35.00 42,469.20 ### 41,049.80 ### ### 40,414.40 ### ### 41,754.00 5 Pek. Plesteran Kolom 1 : 3 M2 3.60 52,941.10 190,587.96 51,404.60 185,056.56 ### 51,056.80 183,804.48 ### 52,491.00 Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah

Transcript of kp perencanaan irigasi

MAHKAMA AGUNGPANITIA PENGADAAN BARANG DAN JASAPENGADILAN AGAMA KABUPATEN KONAWE

TAHUN ANGGARAN 2011 Sekretariat : Jl. Inolobunggadue II No. 830 Unaaha

KOREKSI ARITMATIK / EVALUASI HARGA RENCANA ANGGARAN BIAYA

PEKERJAAN : REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABUPATEN KONAWELOKASI : KECAMATAN UNAAHA KABUPATEN KONAWETAHUN ANGGARAN : 2011

NO. URAIAN PEKERJAAN SAT VOLUMEHARGA PERKIRAAN SENDIRI 1. CV. RAFIL JAYA 2. CV. LALOMBONDA 3. CV. SINAR WAWOTOBI RAYAHARGA SAT. JML. HARGA HARGA SAT. JML. HARGA

%HARGA SAT. JML. HARGA

%HARGA SAT.

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )1 2 3 4 5 6 7 8 9 10 11 12 13

A PEKERJAAN PERSIAPAN1 Pembersihan Lokasi & Pengukuran Ls 1.00 ### 500,000.00 ### 425,000.00 ### ### 400,000.00 ### ###2 Papan Nama Proyek Ls 1.00 ### 250,000.00 ### 250,000.00 ### ### 300,000.00 ### ###3 Pembuatan Direksi Keet dan Gudang Ls 1.00 ### ### ### ### ### ### ### ### ###4 Penyediaan Air kerja & P3K Ls 1.00 ### 300,000.00 ### 250,000.00 ### ### 300,000.00 ### ###5 Pemb. Laporan, Dokumentasi & Asbuilt Dra Ls 1.00 ### ### ### ### ### ### ### ### ###

Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah

B PEKERJAAN PENATAAN HALAMAN DAN PENIMBUNAN1 Pek. Timbunan Tanah Didatangkan M3 ### 90,750.00 ### 89,710.00 ### ### 88,460.00 ### ### 89,360.00 2 Pek. Kerb Beton Casten M3 7.98 ### ### ### ### ### ### ### ### ###3 Pek. Plesteran 1 : 3 Cerb beton Casten t M2 ### 46,219.50 ### 44,742.20 ### ### 44,171.60 ### ### 45,561.00 4 Acian dengan Air Semen M2 ### 25,690.00 ### 24,788.75 ### ### 24,360.00 ### ### 25,161.25 5 Pengecetan Cerb Beton Casten M2 ### 18,783.10 ### 18,592.10 ### ### 18,585.00 ### ### 18,720.60 6 Pek. Pintu Teralis Besi Ls 2.00 ### ### ### ### ### ### ### ### ###

Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah

C PEKERJAAN REHABILITASI KANTORI PEKERJAAN BETON , DINDING DAN PLESTERAN1 Pek. Kolom Beton 20/20 cm, 1pc : 2psr : M3 0.24 ### ### ### ### ### ### ### ### ###2 Pek. Balok Beton 20/30 cm, 1pc : 2psr : M2 0.30 ### ### ### ### ### ### ### ### ###3 Pas. Dinding Batu Bata 1 : 5 M2 17.50 90,166.50 ### 85,191.00 ### ### 82,878.00 ### ### 87,865.00 4 Pek. Plesteran Dinding 1 : 5 M2 35.00 42,469.20 ### 41,049.80 ### ### 40,414.40 ### ### 41,754.00 5 Pek. Plesteran Kolom 1 : 3 M2 3.60 52,941.10 190,587.96 51,404.60 185,056.56 ### 51,056.80 183,804.48 ### 52,491.00

Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah

NO. URAIAN PEKERJAAN SAT VOLUMEHARGA PERKIRAAN SENDIRI 1. CV. RAFIL JAYA 2. CV. LALOMBONDA 3. CV. SINAR WAWOTOBI RAYAHARGA SAT. JML. Harga HARGA SAT. JML. Harga

%HARGA SAT. JML. Harga

%HARGA SAT.

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )1 2 3 4 5 6 7 8 9 10 11 12 13

II PEKERJAAN KUSEN, PINTU DAN DINDING PARTISI GYPSUM1 Pek. Kusen Pintu M3 0.29 ### ### ### ### ### ### ### ### ###2 Pas. Pintu Panil Jati M2 6.24 ### ### ### ### ### ### ### ### ###3 Pas. Rangka Dinding Partisi Besi Holow M2 91.00 ### ### ### ### ### ### ### ### ###4 Pas. Dinding Partisi Gypsum Board M2 ### 97,876.30 ### 97,459.30 ### ### 97,332.80 ### ### 97,662.80

Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah

III PEK. PASANGAN KUNCI & PENGGANTUNG1 Pas. Kunci Pintu 2x Putar Standart Bh 4.00 ### 429,861.00 ### 428,475.00 ### ### 428,778.00 ### ###2 Engsel Pintu Bh 12.00 21,615.25 259,383.00 21,268.75 255,225.00 ### 21,344.50 256,134.00 ### 21,569.50 3 Grendel Pintu Standar Bh 4.00 25,937.00 103,748.00 25,475.00 101,900.00 ### 25,576.00 102,304.00 ### 25,876.00

Jumlah 792,992.00 Jumlah 785,600.00 ### Jumlah 787,216.00 ### Jumlah

IV PEKERJAAN PLAFOND GYPSUM BOARD DAN INSTALASI LISTRIK1 Pas. Rangka Plafond Besi Holow M2 ### ### ### ### ### ### ### ### ### ###2 Pas. Plafond Partisi Gypsum Board M2 ### 94,072.50 ### 93,473.50 ### ### 93,347.00 ### ### 93,677.00 3 Pek. Lest Profil Gypsum Board M1 ### 50,884.50 ### 50,144.50 ### ### 49,494.50 ### ### 50,274.50 4 Perbaikan Jaringan Instalasi Listrik Ls 1.00 ### ### ### ### ### ### ### ### ###

Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah V PEK. PENGECETAN DAN FINISHING1 Pek. Pengecetan Dinding Partisi M2 ### 19,275.50 ### 19,042.50 ### ### 18,832.00 ### ### 19,063.00 2 Pek. Pengecetan Plafon M2 ### 16,682.50 ### 16,560.50 ### ### 16,525.50 ### ### 16,621.50 3 Pek. Pengecetan Dinding Tembok Baru M2 38.60 18,783.10 725,027.66 18,592.10 717,655.06 ### 18,585.00 717,381.00 ### 18,720.60 4 Pek. Pengecetan Dinding Tembok Lama M2 ### 14,581.90 ### 14,408.90 ### ### 14,361.00 ### ### 14,495.40

Jumlah ### Jumlah ### ### Jumlah ### ### Jumlah D PEMBERSIHAN AKHIR

1 Pembersihan Sisa-Sisa Bahan/Kotoran Ls 1.00 ### 500,000.00 ### 400,000.00 ### ### 400,000.00 ### ### Jumlah 500,000.00 Jumlah 400,000.00 ### Jumlah 400,000.00 ### Jumlah

Unaaha, 23 Maret 2011

PANITIA PENGADAAN BARANG/JASA :

NO. N A M A JABATAN TANDA - TANGAN

1. Drs. RUSTAM, MH.I K E T U A 1. . . . . . . . . . . . .

2. A. ABD. RAHMAN, SH SEKRETARIS 2. . . . . . . . . . . . .

3. BURHAN, SH ANGGOTA 3. . . . . . . . . . . . .

KOREKSI ARITMATIK / EVALUASI HARGA RENCANA ANGGARAN BIAYA

REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABUPATEN KONAWE

3. CV. SINAR WAWOTOBI RAYA 4. CV. MITRA KONAWEJML. HARGA

%HARGA SAT. JML. HARGA

%( Rp. ) ( Rp. ) ( Rp. )14 15 13 14 15

450,000.00 ### ### 450,000.00 ### 250,000.00 ### ### 265,000.00 ###

### ### ### ### ### 250,000.00 ### ### 310,000.00 ###

### ### ### ### ###### ### Jumlah ### ###

### ### 90,460.00 ### ###### ### ### ### ###### ### 45,921.60 ### ###### ### 25,450.00 ### ###### ### 18,692.50 ### ###### ### ### ### ###### ### Jumlah ### ###

### ### ### ### ###### ### ### ### ###### ### 88,238.00 ### ###### ### 42,179.40 ### ###

188,967.60 ### 52,628.80 189,463.68 ###### ### Jumlah ### ###

3. CV. SINAR WAWOTOBI RAYA 4. CV. MITRA KONAWEJML. Harga

%HARGA SAT. JML. Harga

%( Rp. ) ( Rp. ) ( Rp. )14 15 13 14 15

### ### ### ### ###### ### ### ### ###### ### ### ### ###### ### 97,714.30 ### ###### ### Jumlah ### ###

429,678.00 ### ### 429,105.00 ### 258,834.00 ### 21,426.25 257,115.00 ### 103,504.00 ### 25,685.00 102,740.00 ### 792,016.00 ### Jumlah 788,960.00 ###

### ### ### ### ###### ### 93,728.50 ### ###### ### 50,584.50 ### ###### ### ### ### ###### ### Jumlah ### ###

### ### 19,214.50 ### ###### ### 16,634.50 ### ###

722,615.16 ### 18,692.50 721,530.50 ###### ### 14,512.50 ### ###### ### Jumlah ### ###

545,000.00 ### ### 525,000.00 ### 545,000.00 ### Jumlah 525,000.00 ###

23 Maret 2011

TANDA - TANGAN

1. . . . . . . . . . . . .

2. . . . . . . . . . . . .

3. . . . . . . . . . . . .

MAHKAMA AGUNGPANITIA PENGADAAN BARANG DAN JASAPENGADILAN AGAMA KABUPATEN KONAWE

TAHUN ANGGARAN 2011 Sekretariat : Jl. Inolobunggadue II No. 830 Unaaha

KOREKSI ARITMATIK / EVALUASI HARGA REKAPITULASI HARGAPEKERJAAN : REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABUPATEN KONAWELOKASI : KECAMATAN UNAAHA KABUPATEN KONAWETAHUN ANGGARAN : 2011

NO. JENIS KEGIATAN H P S 1. CV. RAFIL JAYA % H P S 2. CV. LALOMBONDA % H P S

A PEKERJAAN PERSIAPAN ### 4,225,000.00 92.86 4,400,000.00 96.70 ###B PEKERJAAN PENATAAN HALAMAN DAN PENIMBUNAN ### ### 97.95 ### 97.63 ###C PEKERJAAN REHABILITASI KANTORI PEKERJAAN BETON , DINDING DAN PLESTERAN ### 6,200,245.24 97.48 6,133,309.06 96.43 ###II PEKERJAAN KUSEN, PINTU DAN DINDING PARTISI GYPSUM ### ### 99.58 ### 99.36 ###

III PEK. PASANGAN KUNCI & PENGGANTUNG 792,992.00 785,600.00 99.07 787,216.00 99.27 792,016.00 IV PEKERJAAN PLAFOND GYPSUM BOARD DAN INSTALASI LIST ### ### 99.28 ### 98.90 ###V PEK. PENGECETAN DAN FINISHING ### ### 99.01 ### 98.58 ###

D PEMBERSIHAN AKHIR 500,000.00 400,000.00 80.00 400,000.00 80.00 545,000.00 REAL COST ### ### 98.84 ### 98.55 ###PPN 10 % ### ### 98.84 ### 98.55 ###TOTAL COST ### ### 98.84 ### 98.55 ###DIBULATKAN ### ### ### ###

PANITIA PENGADAAN BARANG/JASA :

NO. N A M A JABATAN TANDA TANGAN1. Drs. RUSTAM, MH.I KETUA 1. ……………………2. A. ABD. RAHMAN, SH SEKRETARIS 2. ……………………3. BURHAN, SH ANGGOTA 3. …………………….

3. CV. SINAR WAWOTOBI RAYA

KOREKSI ARITMATIK / EVALUASI HARGA REKAPITULASI HARGA

#REF!

% H P S % H P S

108.79 4,475,000.00 98.35 99.35 ### 99.49

98.89 6,312,418.16 99.24 99.99 ### 99.99 99.88 788,960.00 99.49 99.91 ### 100.11 99.40 ### 99.64 109.00 525,000.00 105.00 99.94 ### 99.89 99.94 ### 99.89 99.94 ### 99.89

###

Unaaha, 23 Maret 2011

PANITIA PENGADAAN BARANG/JASA :

2. ……………………

4. CV. MITRA KONAWE

#REF!#REF!#REF!#REF!#REF!

KOREKSI ARITMATIK / EVALUASI KEWAJARAN HARGA : UPAH DAN BAHAN

#REF! : REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABUPATEN KONAWE#REF! : KECAMATAN UNAAHA KABUPATEN KONAWE#REF! : 2011

No. Uraian

Sat Harga PERUSAHAAN PENAWARuan Perkiraan

1. CV. NAILAH 2. CV. LAIWOISendiri ( HPS )( Rp. ) % ( Rp. ) % ( Rp. )

A UPAH KERJA1 Mandor Hari 68,800.00 67,000.00 ### 67,000.00 ### 68,000.00 2 Kepala Tukang Hari 66,150.00 64,000.00 ### 64,000.00 ### 65,000.00 3 Tukang Listrik Hari 58,800.00 57,500.00 ### 58,000.00 ### 58,500.00 4 Tukang Kayu Hari 58,800.00 57,500.00 ### 58,000.00 ### 58,500.00 5 Tukang Batu Hari 58,800.00 57,500.00 ### 58,000.00 ### 58,500.00 6 Tukang Besi Hari 58,800.00 57,500.00 ### 58,000.00 ### 58,500.00 7 Tukang Cat Hari 58,800.00 57,500.00 ### 58,000.00 ### 58,500.00 8 Tukang Gypsum Hari 58,800.00 57,500.00 ### 58,000.00 ### 58,500.00 9 Pekerja Hari 45,000.00 45,000.00 ### 45,000.00 ### 45,000.00

B BAHAN DASAR1 Tanah Urug M3 71,000.00 70,000.00 ### 70,000.00 ### 70,000.00 2 Pasir Urug M3 123,500.00 ### ### ### ### 123,000.00 3 Pasir Pasang M3 143,000.00 ### ### ### ### 143,000.00 4 Pasir Beton M3 169,000.00 ### ### ### ### 167,000.00 5 Batu Belah Gunung M3 173,000.00 ### ### ### ### 172,000.00 6 Batu Bata Bh 500.00 500.00 ### 500.00 ### 500.00 7 Batu Tempel M2 250,000.00 ### ### ### ### 250,000.00 8 Terawang/Loster Keramik M3 52,500.00 52,500.00 ### 52,500.00 ### 52,500.00 9 Koral Beton / Split 2-3 Cm M3 281,600.00 ### ### ### ### 280,000.00 10 Koral Beton / Split 5-7 Cm M3 257,000.00 ### ### ### ### 255,000.00 11 Kerikil Sungai M3 238,300.00 ### ### ### ### 238,300.00 12 Sirtu M3 169,000.00 ### ### ### ### 167,000.00 13 Buis Beton Dia 20 Cm Panjang 1 Mete M1 50,025.00 50,025.00 ### 50,025.00 ### 50,025.00 14 Semen Porland Kg 1,800.00 1,750.00 ### 1,750.00 ### 1,800.00 15 Semen Warna Kg 1,810.00 1,800.00 ### 1,810.00 ### 1,810.00 16 Semen Putih Kg 1,810.00 1,800.00 ### 1,810.00 ### 1,810.00

C BAHAN LANTAI1 Tegel Keramik Roman 50x50 cm Bh 23,000.00 23,000.00 ### 23,000.00 ### 23,000.00 2 Tegel Keramik Roman 50x50 cm anti S Bh 23,250.00 23,250.00 ### 23,250.00 ### 23,250.00 3 Tegel Keramik Roman 40x40 cm Bh 13,000.00 13,000.00 ### 13,000.00 ### 13,000.00 4 Tegel Keramik Roman 40x40 cm anti S Bh 13,250.00 13,250.00 ### 13,250.00 ### 13,250.00 5 Tegel Keramik Roman 30x30 cm Bh 6,500.00 6,500.00 ### 6,500.00 ### 6,500.00 6 Tegel Keramik Roman 30x30 cm anti S Bh 6,625.00 6,625.00 ### 6,625.00 ### 6,625.00 7 Tegel Keramik Granit Tile 20x20 cm Bh 3,150.00 3,150.00 ### 3,150.00 ### 3,150.00 8 Tegel Keramik Granit Tile 20x20 cm Bh 3,450.00 3,450.00 ### 3,450.00 ### 3,450.00

3. CV. KARYA OLEONO PUTRA

No. Uraian

Sat Harga PERUSAHAAN PENAWARuan Perkiraan

1. CV. NAILAH 2. CV. LAIWOISendiri ( HPS )( Rp. ) % ( Rp. ) % ( Rp. )

3. CV. KARYA OLEONO PUTRA

9 Tegel Keramik Granit Tile 20x25 cm Bh 4,160.00 4,160.00 ### 4,160.00 ### 4,160.00 10 Tegel Keramik Granit Tile 20x25 cm Bh 4,550.00 4,550.00 ### 4,550.00 ### 4,550.00 11 Porselin 10 x 20 cm Bh 3,705.00 3,705.00 ### 3,705.00 ### 3,705.00 12 Tegel Keramik Roman 10x40 cm Bh 7,500.00 7,500.00 ### 7,500.00 ### 7,500.00 13 Tegel Keramik Roman 10x30 cm Bh 3,250.00 3,250.00 ### 3,250.00 ### 3,250.00 14 Tegel Kuku M1 23,400.00 23,400.00 ### 23,400.00 ### 23,400.00 15 Batu Tempel M2 156,000.00 ### ### ### ### 156,000.00 16 Keramik EX. Platenium Bh 87,100.00 87,100.00 ### 87,100.00 ### 87,100.00

D BAHAN KAYU1 Dolken Kayu dia 10 / 400 cm Btg 7,500.00 7,000.00 ### 7,000.00 ### 7,000.00 2 Dolken Kayu dia 15 / 400 cm M3 9,000.00 9,000.00 ### 9,000.00 ### 9,000.00 3 Papan Kayu Kelas I Bayam / Jati M3 ### ### ### ### ### ###4 Balok Kayu Kelas I Bayam / Jati M3 ### ### ### ### ### ###5 Papan Kayu Kelas II M3 ### ### ### ### ### ###6 Balok Kayu Kelas II M3 ### ### ### ### ### ###7 Papan Kayu Kelas III M3 ### ### ### ### ### ###8 Balok Kayu Kelas III M3 ### ### ### ### ### ###9 Papan / Balok Kayu (bekisting) M3 614,000.00 ### ### ### ### 610,000.00

E BAHAN LANGIT - LANGIT1 Gypsum Board 240 x 120 x 0,9 cm Lbr 117,000.00 ### ### ### ### 117,000.00 2 Gypsum Board 240 x 120 x 0,9 cm Ber Lbr 125,000.00 ### ### ### ### 125,000.00 3 Triples 1220 x 2440 x 0,3 mm Lbr 59,800.00 59,000.00 ### 59,800.00 ### 59,800.00 4 Triples 1220 x 2440 x 0,6 mm Lbr 169,050.00 ### ### ### ### 169,050.00 5 Plywood 9 mm Lbr 74,750.00 74,000.00 ### 74,000.00 ### 74,000.00 6 Kalci Board 6 mm Lbr 50,000.00 50,000.00 ### 50,000.00 ### 50,000.00 7 List Profil 2 x 3 M1 17,250.00 17,250.00 ### 17,250.00 ### 17,250.00 8 List Profil 3 x 3 M1 18,400.00 18,400.00 ### 18,400.00 ### 18,400.00 9 List Profil 4 x 4 M1 20,700.00 20,700.00 ### 20,700.00 ### 20,700.00 10 List Profil 4 x 5 M1 23,000.00 23,000.00 ### 23,000.00 ### 23,000.00 11 List Profil Gypsum Lebar 15 cm M1 25,875.00 25,875.00 ### 25,875.00 ### 25,875.00

F BAHAN ATAP1 Atap Sakura Roop Lbr 65,000.00 65,000.00 ### 65,000.00 ### 65,000.00 2 Not Atap Sakura Roop M1 95,000.00 95,000.00 ### 95,000.00 ### 95,000.00 3 Nok Atap Seng Plat BJLS 20 M1 25,000.00 25,000.00 ### 25,000.00 ### 25,000.00 4 Aluminium Voil M1 6,500.00 6,500.00 ### 6,500.00 ### 6,500.00 5 Seng Gelombang Besar BJLS 20 Kaki 7,428.00 7,130.00 ### 7,200.00 ### 7,300.00 6 Seng Gelombang Besar BJLS 20 ( 6 k Lbr 44,568.00 42,780.00 ### 43,200.00 ### 43,800.00 7 Plywood Lbr 74,500.00 73,000.00 ### 74,000.00 ### 74,000.00

G BAHAN BESI1 Kawat Beton Kg 16,250.00 15,000.00 ### 15,600.00 ### 16,200.00 2 Besi Beton Polos Kg 14,000.00 12,000.00 ### 13,000.00 ### 13,660.00 3 Besi Siku Kg 14,000.00 14,000.00 ### 14,000.00 ### 14,000.00 4 Paku Biasa 5" - 10" Kg 12,350.00 12,200.00 ### 12,000.00 ### 12,350.00 5 Paku Sakura Roop Kg 37,375.00 37,375.00 ### 37,375.00 ### 37,375.00 6 Paku Seng Kg 23,000.00 23,000.00 ### 23,000.00 ### 23,000.00 7 Paku Tripleks Kg 25,000.00 25,000.00 ### 25,000.00 ### 25,000.00 8 Paku Sekrup Kg 21,750.00 21,750.00 ### 21,750.00 ### 21,750.00 9 Besi Strip Kg 28,600.00 28,600.00 ### 28,600.00 ### 28,600.00 10 Staenless Stell Kg 63,250.00 63,250.00 ### 63,250.00 ### 63,250.00 11 Penangkal Petir M1 287,500.00 ### ### ### ### 287,500.00

No. Uraian

Sat Harga PERUSAHAAN PENAWARuan Perkiraan

1. CV. NAILAH 2. CV. LAIWOISendiri ( HPS )( Rp. ) % ( Rp. ) % ( Rp. )

3. CV. KARYA OLEONO PUTRA

12 Pagar Besi M1 400,000.00 ### ### ### ### 400,000.00 13 Profil Reng 0,60 mm M1 23,000.00 23,000.00 ### 23,000.00 ### 23,000.00 14 Screw Truss/Reng M1 37,250.00 37,250.00 ### 37,250.00 ### 37,250.00 15 Dinabolt Bh 2,100.00 2,100.00 ### 2,100.00 ### 2,100.00 16 Profil C.75.300 (Baja Ringan Multit M2 40,000.00 40,000.00 ### 40,000.00 ### 40,000.00 17 Profil C.75.100 (Baja Ringan Multit M2 36,850.00 36,850.00 ### 36,850.00 ### 36,850.00 18 Profil C.75.75 (Baja Ringan Multitr M2 30,800.00 30,800.00 ### 30,800.00 ### 30,800.00 19 Profil U.50.60.100 (Baja Ringan Mul M2 40,000.00 40,000.00 ### 40,000.00 ### 40,000.00 20 Profil U.35.30.40 (Baja Ringan Mult M2 16,800.00 16,800.00 ### 16,800.00 ### 16,800.00 21 Screw kuda-kuda 12 - 14 x 40 Bh 1,650.00 1,650.00 ### 1,650.00 ### 1,650.00 22 Screw Reng 10 - 16 x 16 Bh 1,600.00 1,600.00 ### 1,600.00 ### 1,600.00 23 Tiang Bendera Besi Bh ### ### ### ### ### ###

H BAHAN CAT1 Plamur Tembok Kg 7,865.00 7,500.00 ### 7,500.00 ### 7,865.00 2 Plamir Kayu Kg 6,050.00 6,000.00 ### 6,000.00 ### 6,050.00 3 Cat Dasar / Kayu / Tembok Kg 13,200.00 13,200.00 ### 13,000.00 ### 13,200.00 4 Cat Tembok Metro Line Kg 35,750.00 35,000.00 ### 35,400.00 ### 35,750.00 5 Cat Kayu Kilap Avian Kg 38,500.00 38,000.00 ### 38,500.00 ### 38,500.00 6 Cat Atap Seng EX. Aga Kg 30,250.00 30,250.00 ### 30,250.00 ### 30,250.00 7 Minyak Cat Kg 3,850.00 3,850.00 ### 3,850.00 ### 3,850.00 8 Kalsium Kg 5,500.00 5,500.00 ### 5,500.00 ### 5,500.00 9 Soda Api Kg 5,500.00 5,500.00 ### 5,500.00 ### 5,500.00 10 Lem Fox / Lem Kayu Kg 22,000.00 22,000.00 ### 22,000.00 ### 22,000.00 11 Kuas Biasa 3 cm Bh 8,800.00 8,800.00 ### 8,800.00 ### 8,800.00 12 Kuas Biasa 4 " Bh 3,850.00 3,850.00 ### 3,850.00 ### 3,850.00 13 Kuas Biasa 5 cm Bh 17,600.00 17,600.00 ### 17,600.00 ### 17,600.00 14 Kuas Rool Bh 19,250.00 19,250.00 ### 19,250.00 ### 19,250.00

No. Uraian

Sat Harga PERUSAHAAN PENAWARuan Perkiraan

1. CV. NAILAH 2. CV. LAIWOISendiri ( HPS )( Rp. ) % ( Rp. ) % ( Rp. )

3. CV. KARYA OLEONO PUTRA

15 Amplas Halus Bh 9,900.00 9,900.00 ### 9,900.00 ### 9,900.00 16 Amplas Kasar Bh 2,750.00 2,750.00 ### 2,750.00 ### 2,750.00 17 Meni Besi Kg 7,500.00 7,500.00 ### 7,500.00 ### 7,500.00 18 Meni kayu Kg 13,200.00 13,200.00 ### 13,200.00 ### 13,200.00 19 Minyak Bekisting ltr 11,000.00 10,000.00 ### 11,000.00 ### 11,000.00 20 Residu Kg 8,250.00 8,000.00 ### 7,900.00 ### 8,250.00

I BAHAN PENGANTUNG1 Kunci Antena + Bodi Bh 115,000.00 ### ### ### ### 115,000.00 2 Kunci Tanam Bh 28,750.00 28,750.00 ### 28,750.00 ### 28,750.00 3 Grendel Biasa Bh 8,625.00 8,600.00 ### 8,625.00 ### 8,625.00 4 Grendel Tanam Bh 56,925.00 56,925.00 ### 56,925.00 ### 56,925.00 5 Engsel Pintu Hak Kuningan Bh 8,625.00 8,600.00 ### 8,625.00 ### 8,625.00 6 Engsel Jendelah Standar Bh 2,875.00 2,800.00 ### 2,875.00 ### 2,875.00 7 Pengantung Pintu Stainless Stell Bh 287,500.00 ### ### ### ### 287,500.00 8 Door Closer Bh 287,500.00 ### ### ### ### 287,500.00

Kait Angin Bh 4,025.00 4,000.00 ### 4,025.00 ### 4,025.00 J. BAHAN KACA

1 Kaca Bening 5 mm M2 112,200.00 ### ### ### ### 112,200.00 2 Kaca Rayben 5 mm M2 141,075.00 ### ### ### ### 141,075.00 3 Kaca Buram 12 mm M2 770,000.00 ### ### ### ### 770,000.00 4 Kaca Rasa Cermin M2 71,500.00 71,500.00 ### 71,500.00 ### 71,500.00 5 Kaca Naco 8 Glip Set 104,500.00 ### ### ### ### 104,500.00 6 Lem Sealent Kg 88,000.00 88,000.00 ### 88,000.00 ### 88,000.00

K. BAHAN INSTALASI LISTRIK1 Lampu tanam + Tiang Set ### ### ### ### ### ###2 Lampu SL 20 Watt + Philips Down Lig Bh 82,500.00 82,500.00 ### 82,500.00 ### 82,500.00 3 Lampu Downlight 40 Watt Bh 110,000.00 ### ### ### ### 110,000.00 4 Lampu TL 20 Watt Bh 38,500.00 38,500.00 ### 38,500.00 ### 38,500.00 5 Instalasi Titik Lampu Titik 136,500.00 ### ### ### ### 136,500.00 6 Lampu TL Baret 18 Watt Bh 55,000.00 55,000.00 ### 55,000.00 ### 55,000.00 7 Lampu XL Downlight 20 Watt Bh 55,000.00 55,000.00 ### 55,000.00 ### 55,000.00 8 Lampu Ref Minor TL 2 x 20 Watt Bh 275,000.00 ### ### ### ### 275,000.00 9 Lampu DL 40 Watt Philips Bh 102,850.00 ### ### ### ### 102,850.00 10 Lampu DL 20 Watt Philips Bh 99,825.00 99,825.00 ### 99,825.00 ### 99,825.00 11 Lampu Hologen 150 Watt Philips Bh 84,700.00 84,700.00 ### 84,700.00 ### 84,700.00 12 Saklar Tukar EX. Clipsal Bh 21,175.00 21,175.00 ### 21,175.00 ### 21,175.00 13 Saklar Tunggal EX. Clipsal Bh 18,150.00 18,150.00 ### 18,150.00 ### 18,150.00 14 Stop Kontak Open Clipsal Bh 24,200.00 24,200.00 ### 24,200.00 ### 24,200.00 15 Stop Kontak Close EX. Clipsal Bh 24,200.00 24,200.00 ### 24,200.00 ### 24,200.00 16 Saklar ganda Broco Bh 13,750.00 13,750.00 ### 13,750.00 ### 13,750.00 17 MCB 63 A 3 o Merling gerning Bh 544,500.00 ### ### ### ### 544,500.00 18 MCB 50 A 3 o Merling gerning Bh 522,720.00 ### ### ### ### 522,720.00 19 MCB 20 A 3 o Merling gerning Bh 181,500.00 ### ### ### ### 181,500.00 20 MCB 63 A 1 o Merling gerning Bh 181,500.00 ### ### ### ### 181,500.00 21 MCB 50 A 1 o Merling gerning Bh 174,240.00 ### ### ### ### 174,240.00 22 MCB 4 A 1 o Merling gerning Bh 42,350.00 42,350.00 ### 42,350.00 ### 42,350.00 23 Kabel NYY 4x35 mm2 Eterna M1 198,000.00 ### ### ### ### 198,000.00 24 Kabel NYY 4x16 mm2 Eterna M1 92,400.00 92,400.00 ### 92,400.00 ### 92,400.00 25 Kabel NYY 4x4 mm2 Eterna M1 23,100.00 23,100.00 ### 23,100.00 ### 23,100.00 26 Kabel NYY 4x2,5 mm2 Eterna M1 16,500.00 16,500.00 ### 16,500.00 ### 16,500.00

No. Uraian

Sat Harga PERUSAHAAN PENAWARuan Perkiraan

1. CV. NAILAH 2. CV. LAIWOISendiri ( HPS )( Rp. ) % ( Rp. ) % ( Rp. )

3. CV. KARYA OLEONO PUTRA

27 Kabel NYY 2x2,5 mm2 Eterna M1 11,220.00 11,220.00 ### 11,220.00 ### 11,220.00 28 Kabel NYM 2x4 mm2 Eterna M1 11,220.00 11,220.00 ### 11,220.00 ### 11,220.00 29 Kabel NYM 2x2,5 mm2 Eterna M1 7,920.00 7,920.00 ### 7,920.00 ### 7,920.00 30 NFB 250 A 3 o Ex. Merling Gerning Bh ### ### ### ### ### ###31 NFB 160 A 3 o Ex. Merling Gerning Bh ### ### ### ### ### ###32 NFB 75 A 3 o Ex. Merling Gerning Bh 907,500.00 ### ### ### ### 907,500.00 33 Panel Lantai 30x40 cm2 Standar Bh 363,000.00 ### ### ### ### 363,000.00 34 Panel Lantai 40x50 cm2 Standar Bh 423,500.00 ### ### ### ### 423,500.00 35 Panel Lantai 40x60 cm2 Standar Bh 484,000.00 ### ### ### ### 484,000.00 36 Kawat BC 50 mm2 Roll 60,500.00 60,500.00 ### 60,500.00 ### 60,500.00 37 Kawat BC 25 mm2 Roll 30,250.00 30,250.00 ### 30,250.00 ### 30,250.00 38 Arde Ex. Tembaga Asli Set ### ### ### ### ### ###39 Stik Bh 1,650.00 1,650.00 ### 1,650.00 ### 1,650.00 40 Klem Bh 2,750.00 2,750.00 ### 2,750.00 ### 2,750.00 41 Panel Box Bh 275,000.00 ### ### ### ### 275,000.00 42 Pompa Air Tanam 1 PK Pedrolloc Unit ### ### ### ### ### ###43 Pompa Air Sumur 1 PK Pedrolloc Unit ### ### ### ### ### ###44 Elekroda Ex. Tembaga Asli Btg 363,000.00 ### ### ### ### 363,000.00 45 KWH Meter Bh 550,000.00 ### ### ### ### 550,000.00

L. BAHAN SANITER1 Kloset Duduk monoblok merek Ace Bh ### ### ### ### ### ###2 Tempat Sabun Merek Ina Bh 25,000.00 25,000.00 ### 25,000.00 ### 25,000.00 3 Kloset Jongkok Porselin Bh 112,000.00 ### ### ### ### 112,000.00 4 Bak Fibreglass ( Reservoir 1000 Ltr Bh ### ### ### ### ### ###5 Bak Fibreglass ( Reservoir 3000 Ltr Bh ### ### ### ### ### ###6 Wastapel Dinding Merk Ace Bh ### ### ### ### ### ###7 Wastapel Meja Merk Ace Bh 400,000.00 ### ### ### ### 400,000.00 8 Shawer Kamar mandi Set ### ### ### ### ### ###9 Urinoir Ex. Toto Bh ### ### ### ### ### ###10 Bathtub Massage Bh ### ### ### ### ### ###11 Bak Kamar mandi Fiberglss Bh 950,000.00 ### ### ### ### 950,000.00 12 Floor Drain Bh 12,300.00 12,000.00 ### 12,300.00 ### 12,300.00 13 Kran Air dia 1/2" Bh 17,250.00 17,250.00 ### 17,250.00 ### 17,250.00 14 Kran Air dia 3/4" Bh 23,000.00 22,000.00 ### 23,000.00 ### 23,000.00 15 Seal Tape Bh 5,750.00 5,700.00 ### 5,750.00 ### 5,750.00 16 Stop Kran Btg 46,000.00 46,000.00 ### 46,000.00 ### 46,000.00 17 Pintu PVC untuk Kamar Mandi + Kunci Set 500,000.00 ### ### ### ### 500,000.00 18 Pek. Septick Tank Bh ### ### ### ### ### ###19 Pipa PVC Ø 1/2" AW M1 5,775.00 5,775.00 ### 5,775.00 ### 5,775.00 20 Pipa PVC Ø 3/4" AW M1 5,750.00 5,750.00 ### 5,750.00 ### 5,750.00 21 Pipa PVC Ø 1" AW M1 6,875.00 6,875.00 ### 6,700.00 ### 6,800.00 22 Pipa PVC Ø 1,5" AW M1 12,500.00 12,500.00 ### 12,500.00 ### 12,500.00 23 Pipa PVC Ø 2" AW M1 16,250.00 16,250.00 ### 16,000.00 ### 16,200.00 24 Pipa PVC Ø 2,5" AW M1 23,750.00 23,750.00 ### 23,750.00 ### 23,750.00 25 Pipa PVC Ø 3" AW M1 25,000.00 25,000.00 ### 25,000.00 ### 25,000.00 26 Pipa PVC Ø 3,5" AW M1 35,000.00 35,000.00 ### 35,000.00 ### 35,000.00 27 Pipa PVC Ø 4" AW M1 37,500.00 37,500.00 ### 37,500.00 ### 37,500.00 28 Pipa PVC Ø 4,5" AW M1 37,500.00 37,500.00 ### 37,500.00 ### 37,500.00 29 Pipa PVC Ø 5" AW M1 41,250.00 41,250.00 ### 41,250.00 ### 41,250.00

No. Uraian

Sat Harga PERUSAHAAN PENAWARuan Perkiraan

1. CV. NAILAH 2. CV. LAIWOISendiri ( HPS )( Rp. ) % ( Rp. ) % ( Rp. )

3. CV. KARYA OLEONO PUTRA

Unaaha, 23 Maret 2011

NO. N A M A JABATAN TANDA TANGAN

1. Drs. RUSTAM, MH.I KETUA 1. ……………………2. A. ABD. RAHMAN, SH SEKRETARIS 2. ……………………3. BURHAN, SH ANGGOTA 3. …………………….

### #REF! #REF! 4. ……………………### #REF! #REF! ###

#REF!#REF!#REF!#REF!#REF!

KOREKSI ARITMATIK / EVALUASI KEWAJARAN HARGA : UPAH DAN BAHAN

: REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABUPATEN KONAWE

PERUSAHAAN PENAWAR

%

###########################

################################################

########################

3. CV. KARYA OLEONO PUTRA

PERUSAHAAN PENAWAR

%

3. CV. KARYA OLEONO PUTRA

########################

###########################

#################################

#####################

#################################

PERUSAHAAN PENAWAR

%

3. CV. KARYA OLEONO PUTRA

####################################

##########################################

PERUSAHAAN PENAWAR

%

3. CV. KARYA OLEONO PUTRA

##################

###########################

##################

##############################################################################

PERUSAHAAN PENAWAR

%

3. CV. KARYA OLEONO PUTRA

#########################################################

#######################################################################################

PERUSAHAAN PENAWAR

%

3. CV. KARYA OLEONO PUTRA

23 Maret 2011

MAHKAMA AGUNGPANITIA PENGADAAN BARANG DAN JASAPENGADILAN AGAMA KABUPATEN KONAWE

TAHUN ANGGARAN 2011 Sekretariat : Jl. Inolobunggadue II No. 830 Unaaha

EVALUASI KEWAJARAN HARGA HARGA : UNBALANCE HARGA SATUAN

PEKERJAAN : REHABILITASI KANTOR, PENIMBUNAN DAN PENATAAN HALAMAN KANTOR PENGADILAN AGAMA KABUPATEN KONAWELOKASI : KECAMATAN UNAAHA KABUPATEN KONAWETAHUN ANGGARAN : 2011

HARGA PERKIRAAN SENDIRI1. CV. RAFIL JAYA 2. CV. LALOMBONDA 3. CV. SINAR WAWOTOBI RAYA

( H P S )

NO. U R A I A NTOTAL KETIMPANGAN TOTAL KETIMPANGAN TOTAL KETIMPANGAN

Satu Volume Harga Harga HARGA HARGA HARGASatuan Pekerjaan SATUAN SATUAN SATUAN( Rp ) ( Rp ) ( Rp) ( Rp.) ( Rp.) ( Rp) ( Rp.) ( Rp.) ( Rp) ( Rp.)

A PEKERJAAN PERSIAPAN1 Pembersihan Lokasi & Pengukuran Ls 1.00 ### 500,000.00 425,000.00 0.00 0.00 400,000.00 25,000.00 0.00 450,000.00 0.002 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00 250,000.00 0.00 0.00 300,000.00 0.00 25,000.00 250,000.00 0.003 Pembuatan Direksi Keet dan Gudang Ls 1.00 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.004 Penyediaan Air kerja & P3K Ls 1.00 300,000.00 300,000.00 250,000.00 5,000.00 0.00 300,000.00 0.00 0.00 250,000.00 5,000.005 Pemb. Laporan, Dokumentasi & Asbu Ls 1.00 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.00

SUB TOTAL A ### 5,000.00 - 25,000.00 25,000.00 5,000.00 B PEKERJAAN PENATAAN HALAMAN DAN PENIMBUNAN1 Pek. Timbunan Tanah Didatangkan M3 ### 90,750.00 ### ### 0.00 0.00 88,460.00 0.00 0.00 89,360.00 0.002 Pek. Kerb Beton Casten M3 7.98 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.003 Pek. Plesteran 1 : 3 Cerb beton C M2 ### 46,219.50 ### ### 0.00 0.00 44,171.60 0.00 0.00 45,561.00 0.004 Acian dengan Air Semen M2 ### 25,690.00 ### ### 0.00 0.00 24,360.00 0.00 0.00 25,161.25 0.005 Pengecetan Cerb Beton Casten M2 ### 18,783.10 ### ### 0.00 0.00 18,585.00 0.00 0.00 18,720.60 0.006 Pek. Pintu Teralis Besi Ls 2.00 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.00

SUB TOTAL B ### - - - - - C PEKERJAAN REHABILITASI KANTORI PEKERJAAN BETON , DINDING DAN PLESTERAN1 Pek. Kolom Beton 20/20 cm, 1pc : M3 0.24 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.002 Pek. Balok Beton 20/30 cm, 1pc : M2 0.30 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.003 Pas. Dinding Batu Bata 1 : 5 M2 17.50 90,166.50 ### ### 0.00 0.00 ### 0.00 0.00 ### 0.004 Pek. Plesteran Dinding 1 : 5 M2 35.00 42,469.20 ### ### 0.00 0.00 ### 0.00 0.00 ### 0.005 Pek. Plesteran Kolom 1 : 3 M2 3.60 52,941.10 190,587.96 ### 0.00 0.00 ### 0.00 0.00 ### 0.00

SUB TOTAL C.I ### - - - - - II PEKERJAAN KUSEN, PINTU DAN DINDING PARTISI GYPSUM1 Pek. Kusen Pintu M3 0.29 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.002 Pas. Pintu Panil Jati M2 6.24 468,410.00 ### 459,310.00 0.00 0.00 458,760.00 0.00 0.00 465,360.00 0.003 Pas. Rangka Dinding Partisi Besi M2 91.00 132,045.13 ### 132,121.67 0.00 0.00 131,576.40 0.00 0.00 132,689.73 0.004 Pas. Dinding Partisi Gypsum Board M2 182.00 97,876.30 ### 97,459.30 0.00 0.00 97,332.80 0.00 0.00 97,662.80 0.00

SUB TOTAL IV ### - - - - - III PEK. PASANGAN KUNCI & PENGGANTUNG

1 Pas. Kunci Pintu 2x Putar Standar Bh 4.00 107,465.25 429,861.00 ### 0.00 0.00 ### 0.00 0.00 ### 0.002 Engsel Pintu Bh ### 21,615.25 259,383.00 ### 0.00 0.00 ### 0.00 0.00 ### 0.003 Grendel Pintu Standar Bh 4.00 25,937.00 103,748.00 ### 0.00 0.00 ### 0.00 0.00 ### 0.00

UC - BID < 115 % UC -

OE

UC - BID > 110 % UC -

OE

UC - BID < 115 % UC -

OE

UC - BID > 110 % UC -

OE

UC - BID < 115 % UC -

OE

SUB TOTAL V 792,992.00 - - - - -

HARGA PERKIRAAN SENDIRI1. CV. RAFIL JAYA 2. CV. LALOMBONDA 3. CV. SINAR WAWOTOBI RAYA

( H P S )

NO. U R A I A NTOTAL KETIMPANGAN TOTAL KETIMPANGAN TOTAL KETIMPANGAN

Satu Volume Harga Harga HARGA HARGA HARGASatuan Pekerjaan SATUAN SATUAN SATUAN( Rp ) ( Rp ) ( Rp) ( Rp.) ( Rp.) ( Rp) ( Rp.) ( Rp.) ( Rp) ( Rp.)

IV PEKERJAAN PLAFOND GYPSUM BOARD DAN INSTALASI LISTRIK1 Pas. Rangka Plafond Besi Holow M2 ### 158,178.47 ### ### 0.00 0.00 ### 0.00 0.00 ### 0.002 Pas. Plafond Partisi Gypsum Board M2 ### 94,072.50 ### ### 0.00 0.00 ### 0.00 0.00 ### 0.003 Pek. Lest Profil Gypsum Board M1 ### 50,884.50 ### ### 0.00 0.00 ### 0.00 0.00 ### 0.004 Perbaikan Jaringan Instalasi List Ls 1.00 ### ### ### 0.00 0.00 ### 0.00 0.00 ### 0.00

SUB TOTAL VI ### - - - - - V PEK. PENGECETAN DAN FINISHING

1 Pas. Rangka Plafond Besi Holow M2 ### 19,275.50 ### 19,042.50 0.00 0.00 18,832.00 0.00 0.00 19,063.00 0.002 Pas. Plafond Partisi Gypsum Board M2 ### 16,682.50 ### 16,560.50 0.00 0.00 16,525.50 0.00 0.00 16,621.50 0.003 Pek. Lest Profil Gypsum Board M1 38.60 18,783.10 725,027.66 18,592.10 0.00 0.00 18,585.00 0.00 0.00 18,720.60 0.004 Perbaikan Jaringan Instalasi List Ls ### 14,581.90 ### 14,408.90 0.00 0.00 14,361.00 0.00 0.00 14,495.40 0.00

SUB TOTAL VII ### - - - - - D PEMBERSIHAN AKHIR

1 Pembersihan Sisa-Sisa Bahan/Kotor Ls 1.00 500,000.00 500,000.00 400,000.00 25,000.00 0.00 400,000.00 25,000.00 0.00 545,000.00 0.00SUB TOTAL VIII 500,000.00 25,000.00 - 25,000.00 - -

Unaaha, 23 Maret 2011

PANITIA PENGADAAN BARANG/JASA :

NO. N A M A JABATAN TANDA TANGAN

1. Drs. RUSTAM, MH.I K E T U A 1. . . . . . . . . . . . .

2. A. ABD. RAHMAN, SH SEKRETARIS 2. . . . . . . . . . . . .

3. BURHAN, SH ANGGOTA 3. . . . . . . . . . . . .

UC - BID < 115 % UC -

OE

UC - BID > 110 % UC -

OE

UC - BID < 115 % UC -

OE

UC - BID > 110 % UC -

OE

UC - BID < 115 % UC -

OE

EVALUASI KEWAJARAN HARGA HARGA : UNBALANCE HARGA SATUAN

3. CV. SINAR WAWOTOBI RAYA 4. CV. MITRA KONAWE

TOTAL KETIMPANGAN TOTAL KETIMPANGANHARGASATUAN

( Rp.) ( Rp) ( Rp.) ( Rp.)

0.00 450,000.00 0.00 0.000.00 265,000.00 0.00 0.00

300,000.00 ### 0.00 0.000.00 310,000.00 0.00 0.000.00 ### 0.00 0.00

300,000.00 - -

0.00 90,460.00 0.00 0.000.00 ### 0.00 0.000.00 45,921.60 0.00 0.000.00 25,450.00 0.00 0.000.00 18,692.50 0.00 0.000.00 ### 0.00 0.00

- - -

0.00 ### 0.00 0.000.00 ### 0.00 0.000.00 ### 0.00 0.000.00 ### 0.00 0.000.00 ### 0.00 0.00

- - -

0.00 ### 0.00 0.000.00 464,210.00 0.00 0.000.00 132,702.33 0.00 0.000.00 97,714.30 0.00 0.00

- - -

0.00 ### 0.00 0.000.00 ### 0.00 0.000.00 ### 0.00 0.00

UC - BID > 110 % UC -

OE

UC - BID < 115 % UC -

OE

UC - BID > 110 % UC -

OE

- - -

3. CV. SINAR WAWOTOBI RAYA 4. CV. MITRA KONAWE

TOTAL KETIMPANGAN TOTAL KETIMPANGANHARGASATUAN

( Rp.) ( Rp) ( Rp.) ( Rp.)

0.00 ### 0.00 0.000.00 ### 0.00 0.000.00 ### 0.00 0.000.00 ### 0.00 0.00

- - -

0.00 19,063.00 0.00 0.000.00 16,621.50 0.00 0.000.00 18,720.60 0.00 0.000.00 14,495.40 0.00 0.00

- - -

0.00 525,000.00 0.00 0.00 - - -

23 Maret 2011

PANITIA PENGADAAN BARANG/JASA :

2. . . . . . . . . . . . .

UC - BID > 110 % UC -

OE

UC - BID < 115 % UC -

OE

UC - BID > 110 % UC -

OE

MAHKAMA AGUNGPANITIA PENGADAAN BARANG DAN JASAPENGADILAN AGAMA KABUPATEN KONAWE

TAHUN ANGGARAN 2011 Sekretariat : Jl. Inolobunggadue II No. 830 Unaaha

DAFTAR URUTAN RANGKING KOREKSI ARITMATIKREKAPITULASI RENCANA ANGGARAN BIAYA

P e k e r j a a n :

L o k a s i : Kecamatan Unaaha Kabupaten KonaweTahun Anggaran : 2011Sumber Dana : APBN

No. NAMA PERUSAHAAN

HARGA KOREKSISELISIH RANGKINGPENAWARAN ARITMATIK

(Termasuk PPN ) (Termasuk PPN)(Rp.) (%)(Rp) (Rp)

1 2 3 4 5 6 5 6

1 1. CV. RAFIL JAYA 257,750,000 257,750,000 - 0.00 1 2

2 2. CV. LALOMBONDA 257,000,000 257,000,000 - 0.00 2 1

3 3. CV. SINAR WAWOTOBI RAY 260,630,000 260,630,000 - 0.00 3 4

4 4. CV. MITRA KONAWE 260,500,000 260,500,000 - 0.00 4 3

NO NAMA JABATAN TANDA TANGAN

1. Drs. RUSTAM, MH.I K E T U A 1. . . . . . . . . . . . .

2. A. ABD. RAHMAN, SH SEKRETARIS 2. . . . . . . . . . . . .

3. BURHAN, SH ANGGOTA 3. . . . . . . . . . . . .

Rehabilitasi Kantor, Penimbunan dan Penataan Halaman Kantor Pengadilan Agama Kantor Pengadilan Agama Kab. Konawe

SEBELUM KOREKSI

SESUDAH KOREKSI

MAHKAMA AGUNGPANITIA PENGADAAN BARANG DAN JASAPENGADILAN AGAMA KABUPATEN KONAWE

TAHUN ANGGARAN 2011 Sekretariat : Jl. Inolobunggadue II No. 830 Unaaha

DAFTAR URUTAN RANGKING KOREKSI ARITMATIKREKAPITULASI RENCANA ANGGARAN BIAYA

KETERANGAN

7 1.12 Pembulatan

TURUN 2,886,800.00 4,043,000.00

NAIK 2,878,400.00 2,878,000.00

NAIK 2,919,056.00 4,460,000.00

TURUN 2,917,600.00 4,480,000.00

1. . . . . . . . . . . . .

2. . . . . . . . . . . . .

3. . . . . . . . . . . . .

Rehabilitasi Kantor, Penimbunan dan Penataan Halaman Kantor Pengadilan