ASSESSMENT REPORT ON THE

NICOBI LAKE Cu-Ni-Co PROPERTY

LE TAC TOWNSHIP, QUEBEC

NTS 32F/8

17 CLAIM OPTION

MINORCA RESOURCES LTD.

MER - S.LS.E.M. 1993/04/07

GM 5 1 7 4- El

TABLE OF CONTEBTS

- Assessment Report

MAPS

PAGE

1-5

- Figure

- Figure

- Figure

- Figure

- Figure

- Figure

- Figure

1. Location Map

2. Claim Map

3. Claim Map

4. Road Map

5. Regional Geology Map

6. Geological interpretation of air-photo & air-photo

7. Surface plan of drill holes

- Map#6 NL-1. (in back pocket)

APPENDICES

- Appendix 1. Certificate of qualifications

- Appendix

- Appendix

- Appendix

- Appendix

- Appendix

- Appendix

- Appendix

- Appendix

- Appendix

2. Claim list

3. Selected bibliography

4. Vertical cross sections

5. Drill logs

6. Certificates of analyses

7; Invoices

8. List of expenditures

9. Letter to the legal dept., MER

10. Press releases

ASSESSMENT REPORT ON THE NICOBI LAKE PROPERTY

NICOBI 17 OPTION, MINORCA RESOURCES LTD.

Geofact Inc. of Rouyn-Noranda, Quebec conducted a diamond drilling program

for Minorca Resources Ltd. of Val d'Or, Quebec during the period of April 22,

1991 to April 27, 1991 (DDH# HIC-91-2 to NIC-91-12). DDH# NIC-90-1 was

drilled from November 19, 1990 to November 20, 1990. Total expenditures for

these two diamond drilling campaigns were $61,421.36 (Appendix 7). The

program in 1990 for one drill hole totals $8,758.13. Expenditures for the

1991 program total $52,663.23 (Appendix 8) . Some of the :esearch was

conducted in the mining office in Rouyn-Noranda. Several confidential files

are held by Minorca Resources, and these were also used for the compilation

of the property. A certificate of qualifications can be found in Appendix 1.

The claims are all held in good standing and are registered with the Quebec

Ministry of Energy and Resources (Appendix 2). Maps and references can be

found following this report and a compilation Map (Map# NL-1) can be found in

the pocket at the very end of the report.

The 1'.cobi Lake property is situated at the southwest corner of Nicobi Lake

in Northwestern Quebec (Figure 1). It is located about 75 km east of the town

of Quevillon and is about half way between the mining towns of Val d'Or and

Chibougamau. The entire property consists of 57 claims (Figure 2) all of

which are under option. Forty of the claims are under option from a numbered

company in Val d'Or and these claims will not be allotted any of the

assessment work. The property is located in the southeastern part of Le Tac

township. Approximately 40% of the property has been slashed in the last two

years by Domtar of Quevillon (Figure 3). Unfortunately, several of the claim

posts were obliterated even though they were very well marked with flagging

tape and fluorescent paint (see appendix 9, letter of November 14, 1991). The

property can be reached by taking an all weather gravel road (#104) from the

Quevillon lumber mill which leads east to the 73km mark. At that point, the

#402 leads north for about 12 km until another gravel road is reached and

this leads south southeast for about 4km. These roads run through the

property which makes access excellent (Fig. 4).

Minorca's property can be seen on a regional geology map (Fig.5). The rocks

2

have never been mapped in any detail east of Benoit township, which leads to

a lot of interpretation. The property appears to be located at the eastern

limit of several rather strong lineaments which may indicate shear zones such

as on Freewest's ground located 18km to the west. A series of mafic and

ultramafic rocks are located in the southeast part of Le Tac township. Also,

in Grevet and Mountain townships, VSM and Placer Dome own several land

positions which host several million tons of zinc, copper and silver

reserves. These deposits, one of them known as "Grevet M" is located within

the cameron deformation corridor, which leads from the Floridin Mine through

Grevet and possibly up into Muy and Le Tac townships. Two major lineaments

can be seen on the air photo map sheet (Fig.6). These lineaments are shown as

"Ll" and "L2". They are both trending approximately 098 degrees azimuth. L1

is about 1.2km long and L2 is about 1.8km long. Several days of prospecting

and stripping with a grub hoe were spent on L1. There are several outcrops

and road cuts on either side of the road. Very strongly sheared rocks are

present here for a width of at least 200 metres. The rocks are characterized

by nearly east-west trending quartz sericite shists and dipping almost

vertical. Small amounts of sulphides are present as very finely disseminated

grains, the main sulphide being pyrite, and some chalcopyrite. Only

subordinate amounts of these sulphides were observed. There is about 600

metres that separate the two lineaments and it is suspected that a major

shear zone occupies this width. A local geological interpretatiori--sirbws the MER-SYSTÈMES

locations of the two lineaments and the outsswessnMesymt in the field

(Fig.6). QUEBEC

1993-01-2t A compilation of the property at a scale of 1:5 000 can be found in the back

RECI pocket (Map#NL-1) of this report. Most of the geophysicar work performed in the past has been conducted on the seventeen claim option. Three maiir'induced

polarization (IP) anomalies are present on the property. Several areas are

coincident with magnetic anomalies. It appears quite evident that at least

two of these anomalies continue onto the 40 claim option. Seven showings

(A-H) have been found, these are indicative of sulphide concentrations and

gossans, mainly copper-nickel-cobalt sulphides. Only showing "A" has been

worked on in some detail where 1.8 million tons of 0.472 Hi & 0.252 Cu have

been identified. This calculation was performed by a Noranda geologist back

in the 1960's. Only a limited diamond drill program was performed with 19 of

3

the 20 vertical drill holes going to a depth of 100'. In November of 1990 and

following break-up in 1991, Minorca conducted a diamond drilling campaign on

the 17 claim option and excellent results were obtained (Figure 7). Several

high grade and meaium grade copper, nickel and cobalt values were returned.

The press releases have been included in appendix 10 for reference, along

with vertical cross sections (Appendix 4) and drill logs. All of the

certificates of analyses are found in Appendix 6. Hole #NIC-90-1 intersected

37.61m of 0.75% Cu and 0.89% Ni. A 0.82m interval contained 1.08 g/t Pa and

1.05 g/t Pt. Hole #NIC-91-2 intersected 36.88a of 0.292 Cu, 0.84% Ni and

0.03% Co including 4.70a of 0.73% Cu, 3.94% Ni and 0.09% Co. Hole #NIC-91-6

returned 31.66m of 0.35% Cu, 0.73% Ni and 0.02% Co. Hole #NIC-91-7 returned

63.08m of 0.21% Cu, 0.42% Ni and 0.01% Co. Several other excellent sections

were intersected and can be seen in Appendix 4.

The rocks found on the entire property are gabbros, ultramafics, granites,

intermediate to mafic volcanics, amphibolites and quartz-sericite schists.

Distinction between the mafics and ultramafics in the field can sometimes be

rather difficult because of the fine grained nature and heterogeneity of the

rocks. All of the rock types observed, except the granite, show some degree

of alteration. The intermediate to mafic volcanics and the schists show a

very prominent near east-west schistosity.

The objective of this diamond drilling campaign was to identify and confirm

the existence of a copper-nickel-cobalt showing, to determine the associated

rock types, to figure out the attitude of the known deposit ("A Showing") and

to determine the possible extent of the deposit, both on a small scale and a

larger scale.

High grade and medium grade Cu-Ni-Co sulphides occur throughout most of the

core. For the first time, we were able

layered complex. What has been described in

or a fine grained version of the medium to

an ultramafic rock (peridotite). Several

to identify what appears to be a

the drill logs as a microgabbro

coarse grained gabbro is actually

inspections of the core have

identified interlayered mafic and ultramafic rocks, sometimes the layering

occurs on a very fine scale (millimetres) and other times it appears on a

larger scale, in terms of centimetres or decametres. The mineralization

4

occurs in different forms within these layered units. Basically there are

three types of mineralization. The first type occurs as disseminated

sulphides. The second type occurs as semi-massive sulphides, within and at

the base of some of the identifiable layers. The third type occurs as massive

sulphides which show a distinct intercumulate texture indicative of a deposit

of primary origin, there are also some massive sulphide lenses which have

been remobilized along small scale secondary shears and fractures. These

features are indicative of a a agmatic sulphide deposit such as the world

class Sudk.ry eruptive. The ore zone has a strike length of at least 70

metres and is open to the west. The drilling intersected ore down to a depth

of about 100 metres. The zone appears to have an almost east-west strike

(approx. 100 degrees), is dipping steeply to the north, between 70 degrees

and vertical and is plunging at about 55-60 degrees to the west. That is why

hole# 10 failed to intersect ore grade material. It is my belief that the

bottom of hole# 10 began to intersect the low grade halo of the top of the

deposit. Perhaps the most important discovery from the campaign is that the

base of the layered intrusion has not yet been found. The sulphides that have

been discovered are near the top of the intrusion and are distictly showing

repetitive cycles. It is my belief that when the base of the intrusion is

found, through a diamond drilling program, the chances of finding a much more

significant ore deposit is excellent.

In summary, a total of $61,421.36 was spent on the 17 claims, the funds being

allocated to claim# 3503252. Several interesting rock types occur on the

property, especially the quartz-sericite schists and the mafic-ultramafic

rocks. The schists could be a good target area for gold mineralization. The

width of the shear zones found in the northwest part of the property are

itpressive and this could lead to a discovery of a deposit of significant

tonnage. The mafic-ultramafic rocks observed are hosts for base metal

deposits. Mineralization consisting of copper-nickel-cobalt sulphides are

present in economic values on the 17 claim option. Together with the airborne

geophysical surveys and the air photo interpretation, it appears quite

evident that a good part of the 17 claim group is underlain by the mafic and

ultramafic rocks, and it should be noted that no comprehensive exploration

program has ever been conducted on the rest of the property, outside the area

of the "A Showing". This in turn can lead to the discovery of other base

JOEL SCODNICK, B.Sc.

Geologist

5

metal deposits and could also lead to lateral and depth ex' -:r of the

known deposit, better known as the "A" showing.

The entire property shows excellent potential in finding other showings of

base metals and precious metals. It is also important to note the occurrence

of platinum and palladium group metals which are directly associated with

copper and nickel sulphide concentrations. I would strongly suggest

conducting a phase one exploration program on the entire claim group

consisting of line-cutting, geophysical surveys (magnetometer and maxmin),

mapping and some geochemical sampling, followed by a diamond drill program.

Respectfully submitted,

OURCES LTD./ RESSOURCES MINORCA LTEE KE PROPERTY/ PROPRiETE. LAC NICOBI

NIINORCA RESOURCES LTD./ RESSOURCES MINORCA LTEE NICOBI LAKE PROPERTY/ PROPRIETE LAC MCOBI

SCALE/ECHELLE 1: 50,000 GEOFACT IINC.

1

MINORCA RESOURCES LTD./ RESSOURCES MINORCA LTEE.

NICOBI LAKE PROPERTY/ PROPRIETE LAC NICOBI SCALE / ECHELLE 1: 20,00

. on

NELr

)

•'~. ~ -~,

y~c I;a_R•__

(~ : !305

• nL.

=Ynl •

1

18

til ;

V ' ~~•v~~ _

.o~°

4;:-/-"

~.~

IA) o..r~

' • o ~f ~ ~'~_ ~ s9rt°' ~ J ~f ~ S~

/ ,J/

w►. - o O~

~ 'I; po _ ,oé o

• 288_

BENOÎT

\l''. -334

/ (_ /1 cii. —. ~ ~/~ f . ..i r

f ~.

4 r

~

~

i'A, \

~

~ ~~--‘;~ u.. c `- P _

;/

;

r" t 337.—rr

~~1~-;L/ar

55 s ^ î

ri ~

~ ~,-;`~ ~~, :e._:,.._,, .--,c; ~ ~., ~ r

. . . > ' ~--rw.. 4,.—.1,~~/'~ii~ /.:;f

~ . ~~:

T DE LA CARTOGRAPHIE. ES ET DES RESSOURCES. s a our tels CÙIOQrques au

>s Cartes au Canaria.

SCALE 1250 000 Figure Na. 4

w sIVANIP/

~ < Puskictarnick ~

~-~REElvYEST

1 Lac : urge

I ~ MINORCA

Cu-NI Massive Sulphide w: discovery in hole #NIC-904" tvv c i East

party

37.61m of 0.75% Cu. 0.880/0 in d. 3.66m of 137% Cu. 4.391. 14. 0.06% Co incl. 0.82m of 14.901. Cu, 2.34% f4, 0.031. Co

• 26.O g/t Ag. 105 g/t Pt,108 g/t Pd

VSM RESOURCES AREYET ..M DEPOSIT

10.2 million tons of 8.2T/. Zn, 0.44% Cu, 35 g/t Ag

Lac Descoteaax

New discovery of 4.3m of 121Y. Zn, 0.64% Cu, 12.4 g/t Ag

VSE TRADING SYMBOL: MYR REGIONAL GEOLOGY MAP GEOLOGIE REGIONALE MINORCA RESOURCES LTD./ RESSOURCES MINORCA LTEE.

NICOBI LAKE PROPERTY/ PROPRIETE LAC NICOBI SCALE 1-=4 PALES ECHELLE 1"-4 MILLES REOFG'QCÛ ~.

.h/ QUARtZ SERIGTE 5cMisr

V5 /NTfRA4EQ/,¢TE-MARG I/OLG9tl G5

34 64.6/3,Fo

zlP ULTRAMqFicis

iG CaRANiT'E

.U4/8411ENr NOM AO QHOroj

. OUTGROP

ASSGMED 640Lo6/G9L CoA1r'9Gr

~ .9kE

00° 4eaP42r/ ,BrxrNagy

~ ,eo,so

LI, ~2 LiivEIMENrS

® Gouvernement du Québec • th ustese de l'Energe et des Ressources Photocartothequo québécoise c.Tous droits reserves 1990

~_ ~ l''~:1'?._ .^~. . - -•. . .

-~'s':~~•: ;~:r{.. . ."~: '-'k'~: .jfiy.•.~ .. ;~ •~' ~ ÿ.,

z. .Lâ '. +4~~i~-•~ .~%i~- ..4•

a~

_0.. :4*. '•~. .\L•r. .~•: .~

..I„r.C~~:~; yix?' '.,. ~~ ~1

• -~ M~~_~i. :•~

}

r.Y~. i1•~`.

~~~;~;~a~ ; +~ :tr~~x~ ., ;1►: ~

4 _•.~.\~ \ ~ 'A: •,y 2 111 r•

~ f1

•• ~ ~~..,:.

~~.:,,✓ti~

• ~ â~+b~w~

i 1F i.

~ '. '. ^. r,~. l~~ ~/~"ÿ ~ .f-~}.!k•~...~*~

l'~ i'. i ~ ~?1 Y ~~~•4 ~ KI~+:`.~ N''

~.. . `t ~✓ ♦~ .y : ÿ [

•.. ~•3'' y~,y.:4 ~ ~ !h4 !.:

~ ~~• ~~~ ~rT ~~ .• ~

~y.~~ + .14~ !l ~.

~ ~ y...0.4%. ... ~ ~•

.~.4= ~%—•. ~t; , ~ _ .:: '~

..~ .y .i••`~'`~ ~ -~~.Y~~••,t~

+.(16.4.1.•

NC-91-2 MC-91-6 MC-91-7

NO SIGhF)CANT MNERAUZAT 0N

0 N1C-91-10 This drill hole is located 40m north of this pont

+ O O

MC-91-3

3186m (103.97 of: 035/ Cu 0.73% N. 0.02'/ Co ial 24.15m (792') of: 0.38% Cu 0.90 M. 0.02% Co 72m (2361 of: 026% Cu 100% N 0.02% Co id. 3,8tn (12.5') of: 039% Cu 162°/ M. 0.037. Co

(12f1 of: 029% Cu 0.84% Ni 0.03% Co I nol 4.70m (15S) of 0.737. Cu 3947. N. 0.09% Co

250m (82) of: 022% Cu 0.54% N 0.02°/ Co 112m (377 of ;:15°/ Cu 0.95°/ N 002°/ Co --. ~

)4.17m (465) of: 0.17°/ Qi 05.9% M 0.01°/ Co ia( 0.82m (277 oÆ: 038 Cu 105'/. 0.027. Co Mi 1.50m (4.9) of 03f/° Cu 0.94% N. 0.02% Co ncl 20m (65) of 0.18/. Cl 129% Ni 0.04% Co 12fxîr (39.9) of: 0.14% Cu 058°/ N[ 0.017. Co lid 120m (49) of: 0.577. Cu 3.98% M 097°7. Co

J 63.08m (2077 of 02f/ co. 0.42% Nl 09f/ Co irct 11.58m (37.97 of: 022°/ Cu 0.747. M 0.02% Co bel 10.50m (345) of: 025% Cu 0.67% N. 09f/. Co

MC-91-4 MC-91-5

17.60m (57.71 of. 024% Cu 0.48%. N. 0.01% Co ncl 130m (4'27) of 030°/ Cl 057°/ N. 0.027. Co

0.50m (1T) of: 020% Cu 160°/ N. 0.03°/ Ca 250m (82') of 0.41'/ Cu 050% M 093%

MC-91-8 MC-91-9

1188îr (38.9) of 021% Cu 0517. N. 0.02% Co 250m ( 827 of. 0.147. Cu 0.75% Ni 0.037. Co 170m ( 587 of 0257. Cu 114% M 0.02°/ Co

xi

- 00+2_5S DRILL HOLE LOCATION

SURFACE SHOWING

AREA PREVIOUSLY DRILLED IN EARLY 1960's

NICOBI LAKEBt`~: :":: .~TAL .Pi-3 )' T:RTY

SURFACE. PLAN

LE TAC TO'JVNSHP; OJFBEC

10 8 6 4 2 0 10 20(m)

30

DATE: July 16, 1991

O 12.84m (4157 of: 0.31°/ Cu. 0.58/ Ni 0.02% Co O incL 150m (4.9') of: 0.767. Cu. 135% N. 0.037. Co + O O

1

LU ~ +

O O

MC-91-11 MC-91-12

1954m (84.fl of: 0.18% Cu. 022% NL 0.01'/° Co

- 00+25N

APPENDIX -

CERTIFICATE OF QUALIFICATIONS

APPENDIX 1: CERTIFICATE OF QIIALIFICATIONS

I Joel Scodnick, of the town of Rouyn-Noranda, in the Province of Quebec, hereby certify that:

1) I am a consulting geologist with the firm of Geofact Inc. of Noranda.

2) I am a graduate of Concordia University in Montreal, Quebec, and hold a Bachelor of Science Degree in Geology.

3) I am a graduate of Algonquin College in Ottawa, and hold an Honours Distinction Diploma in Electro-Mechanical Engineering Technology.

4) I have 11 years experience in mineral exploration in Canada with 9 years in precious metal and base metal exploration in northwestern Quebec and northeastern Ontario.

5) I am a member of the Quebec Prospectors Association.

6) Permission is granted to use this report completely or partially for assessment and qualification requirements.

Dated in Rouyn-Noranda, Quebec this 15th day of January, 1993.

_--() 1 Scodnic . c.

Geologist,"--

APPENDIX 2: CLAIM LIST

EXPIRY DATE CLAIN4 NUMBER

3503251 22-03-95 3503252 22-03-95 3503253 22-03-95 3503254 22-03-95 3503255 22-03-95 3504591 24-03-95 3504592 24-03-95 3504593 24-03-95 3504594 24-03-95 3504595 24-03-95 3504621 24-03-95 3504622 24-03-95 3504623 24-03-95 3504624 24-03-95 3504625 24-03-95 3504631 25-03-95 3504632 25-03-95

Total of 17 claims measuring 272 hectares.

TÂP-PENDIX 3

SELECTED BIBLIOGRAPHY

1959, Régions minières visitées, M.E.R.Q., RP 443.

Moody, G.E., 1956, 7DDH Report, Noranda . Mines Ltd.

Stamp, J.C., 1957, Airborme Geophysical Report, (MAG-EM), Noranda Mines Ltd.

Londry, J., Mines Ltd.

Londry, J., Mines Ltd.

1957, 4DDH Report, Nicobi Lake

1957, Geological map, Dufresnay

Londry, J., 1957, Mines Ltd.

5DDH Report, Dufresnay

SELECTED BIBLIOGRAPHY

PUBLICATIONS

Avramtchev, L., 1981, Cartes de gîtes minéraux, M.E.R., DPV 744.

Duquette, G.,

Gauthier, J.,

Lessard, D.,

Proulx, M.,

Remick, J.H.,

1970, Stratigraphie de l'archéen et relation métallogénique, M.E.R.Q.

1986, Géologie de la région de Miquelon, DP-86-10.

1977, Exploration Ltée, Fiche de gîte, M.E.R.Q.

1990, Le corridor de déformation de Cameron: une discontinuité aurifère et polymétallique, M.E.R.Q., PRO 90-04.

1959, Région de Margry-Prévert, M.E.R.Q., RP 394.

Remick, J.H.,

ASSESSMENT FILES

GM 4680

GM 6293

GM 6298 A-B

GM 6428 A

GM 6428 B=C

GM 8005 Londry, J., 1958, Mines Ltd.

GM 8006

GM 8009

GM 10502

GM 12726

GM 13413

GM 20038

GM 20881

GM 20921

GM 22336

GM 25067

GM 30555

GM 31868

GM 32815

Fox, V.J., 1958, Geophysical report, (MAG), Noranda Mines Ltd.

Moody, G.E., 1957, 11DDH Report, Noranda Mines Ltd.

Herminston, P.B., 1960, 24DDH Report, Noranda Mines Ltd.

Harju, H.O., 1962, 8DDH Report, International Co. Ltd.

Adhington, R., 1968, 4DDH Report, International Nickel Co. Ltd.

Harper, H.G., 1967, 10DDH Report, International Nickel Co. Ltd.

Bischoff, C.T., 1967, Geophysical survey (MAG) Report, Iron Cliffs Mines Ltd.

Hallof, P.G., 1967, I.P. Survey Report, International Nickel Co. Ltd.

Bischoff, C.T., 1967, 6DDH Report, Iron Cliffs Mines Ltd.

Mathieu, A., 1966, Feche de gzte, M.E.R.Q.

Tremblay, M., 1974, Summary Report, Mousseau Tremblay Inc.

Imbeault, G., 1976, Geophysical survey (MAG-EMV), UMEX.

Imbeault, G., 1976, 3DDH Report,

GM 37748 Marchand, J., 1981, Compilation Report, Golden Spoke Mines Ltd.

GM 42818 Marchand, J., 1985, Rapport géologique, Ressources Minières Aabarock.

• Adhington, R.,

Lee, A. C. ,

Laforest, J.,

Scodnick, J.,

PERSONAL FILES

1963, 10DDH Report, International Nickel Co. Ltd.

1966, Report on property, Peerless Canadian Explorations Ltd.

Evaluation Report on the Nicobi Lake Property, Le Tac Twp., NTS 32F/8, Ort . 23 , 1990.

Report on the Nicobi Lake Property, Nicobi 40 Option, NTS 32F/8, Le Tac Twp., Que., April 6, 1992.

MAPS Aéromagnétique: 1:633360 Pusticamica Lake#14276

Aéromag-EM : 1:20000

1:20000

Topographique : 1:250000

1:50000

1:20000

32F/8-200-101 M.E.R.Q.,

32F/8-200-102 M.E.R.Q.

32F Lac Waswanipi

32F/8 Lac Pusticamica

32F/08-200-102 Lac Nicobi

APPENDIX 4

VERTICAL CROSS SECTIONS

0.29. 0.57/31.9 m

VtRT/G4L L;k:iss SEG7/c.V [veil-i44 EAST ALaNG ¢

DDH# NIC-91-2 & NIC-91-3 A•S A•7

035,0.1315A .23,0.42/30.5.

° y~~• 0p~. Y

,.• ' a Y

J~~ ~

•~~ oa~° ^

~ ~r ' â g,

'"cf-4;,.• ~, pP

h Q \Y, •

0~ "‘

~r~ 0• `p $ 0• 1 p oç hy , o~ o

QY • 0• 0 y, p 0

093y 01.4 4) 1

0' 0 ,49• a lL!J.', ti

yo•

'0 a

~

r~

p

0.4',047

~

0.4',047

•p

pp ti

PP a•

O0:

Qh4q

p

0

O

y

ô 0

0

a10

~ 'oVs* pOr

~o!

h c ~' â'p,ti' d' 0 0

ao °Cd

o w

~

p ~•3ti~o0Q

`~

~

• "a*

a00. o,Q

0p ? OP°+y00~ti

0 4t.• 0

~ o w • y, o• p

w

~ O

o

q

o;.P

Nicobi Lake Property Vertical Cross Section (Looking East)

MINORCA RESOURCES LTD.

A~3 API

f

o6‘. 0'

X-15

0.15.0.41/32.2M

O.IB,0.2017n 0.08, 0.13/31.4m

.a o•° ¢~

~p

o-' ~ o•

J.'

( 0 fl,ct!

<Jh

0.47. 138. 0.03 •/.Cu. %NM ~ /.Co 3G Gabbro 4P Peridotite

MINORCA RESOURCES LTD.

DDH#: NIC-91-4 & NIC-91-5

0.2,1 .0.37/31.0...

0

Nicobi Lake Property Vertical Cross Section (Looking East)

A-Z

0.29, 0.60/32.3...

4.3

0%.0:71/11.8*

f

o' ~• ~°~0'0 }~~*a Q \0, 0o S o o~~

,

O' Q, 0- 010 0 ~ a ~ OoÂ3. °•ti;y°a_\h

~' Cr P ~ 0.P • 0`\ Ô

~i

\ tr~. • e' °'';._,y~ •~

1 a°b• pf1°~o-~pti‘ y ~ \.°' °~•°a Oô ~ ,~,.°~. , d•~, o°+P 1

`` o°t° ~^' °p ! o

~. \

• ~ o~ ~~' \•e ,1•

r`

~~ a~ •~ °Y 0~ a

a p~ ~ a1~ °~ ~,~i

`. °~~ °~• cr i.

Oati• b~ \? t~y cil".

00 ~,b•° OçQL O

0.47.1.38;0.03 %Cu, "/d~i, % Co

3G Gabbro 4P Peridotito

~' ' ~0.0\

0A\0

b, ' . 0.0\\

01~ â.fl,OA\t 0•

6ô• 0;p~~0uAa

0• 2 pA ~ 0.2-`' , 0\

3

D'Op\8

~. oo:''6 ô. .°0.0-

-IL,

0} , 0' p

A S °\

0e~ Of-0p1

p6

,

,o'b

y

,0Ah

\y O O A

03'1°0' \Gb,i

03y'0,0

0

03.1. * 0:1°.0•0P 0+~1,

!~\b,a:1,4,

0~

0`,y,0.pl. 9. 00\\

C3 • 0P1 ` o-1

a 0 0~~ 0 yO,

0\5 ! 0~~' pb1~~ 1

t+ 01p' p ~0.0' ~y

* \g. 0.

~` O'

6• p\5• O~L

! 0Z • ~S' o\\ ~ O' y\.o ~

oap.

°' ,rt\'0.~~ 1 1

0,010,0 O 00

0»k' 0.°t‘' 39. O

.00`'

~ C" 011' 0.0\u\

p17.. 059, ~910P\5

01A'0 0\y 0,~, 0co.....

0,0\\

~ p~` 0~, Al,„

,~ 0' 0,•.*

pA6, 0

O,~ai\ vq~0.0$

\

0.090. 00ph,.

` 0'0b, 0

0

~0A\Apb

‘ 0~1' 0ti9'0 h ‘ 03.1. ~.0.°°

.` 0P ü

Nicobi Lake Property Vertical Cross Section (Looking East)

DDH#: NIC-91-6 & NIC-91-7

MINORCA RESOURCES LTD.

7 ~ tr ~

try.

a`~• 6.3. tr~r 01~`'

a ad'' oe , od o• ~' d° aTO 3 d• o\,

otA

a ~a' ~•

~ ao oa ri,,, ° a a o,

~oo tr y

~%q

~ (14 ° o a ib • 0h , 4.

oy' p~ ' ao a,' b e• ~ u,p'~ a° ~J. ~.0' • a~ ^ a t

o o4s' 0P C o s%' trob' or Sb

tP tPx~ao~~

OtN*°. c~ ~' aoy.°~

oy' opa o~ e vs. , o~~ 000

o9• ti

q oy , o7P 6

p~w' i7tib • D~ 01, ~a o

~,y 1. ~,~,, ~,, ~,~

~ry~. a'b h

o~~' 0~ ~o~ D~ ~

~

o• 0~' `oiA ~

~Ctiop

O~° Op~~ 0sP opy

,

,,,'4"~ ,p‘,. ~ \~atiy. •o~• 40

ory~• o~• a~ti

ti ~• Oo\. 1P

~' o~ O cPa' a o,o' a a

~ tio° ° oa' o- 0

osd uAsa z,ti

0 ~ ~' I. ao~. oA •

~Yo`' ~~ ao

DDH#.' NIC-91-8 & NIC-91-9

0.47. t38. 0.03 33 4P

Q22,034162.5.

D

Oms

0,0 ,w' o

`'~ ~ ~, • p16 •° p\\ ~ OsJ°'O ti 0 • 0),A.

0 ‘p5'° 0

Oa '' O5 °\~. a a3\, 0'

,

oA\a

D~B• 0~ 0

D~ ~ 0i~• .W3 ~ 0 •0

Oh' O~b 00p5

Oa3b•

ONb.'' 086

\ 0•-•-•

u°5'a o,d~ ,ap1D

0

0o ~1'

0o \•0p0,

o~, ôb•° ô,po3 ojD`°•

o~ • D o• oa\

0a°'° 0 63 0°1•

ort' po ,°~ t.)41 0~

O.11•~~ ' 30o5 o~ °L)"" o~

`',~. or

OOy•~' oap3

oob•°CP

A

o;o0.06"

0~'0• boo3

0~► •0'rt~ o o ü~ ~~

d~ 0$:b, ~1.°~

0,0 ~ ob 0.

0ô ~ OP" ~°~o

oôÂ;°O,p~.°s. o~c,

00.°X 1 • 0.0 0'

oA' oy‘A~

d\'

Nicobi Lake Property

Vertical Cross Section

(Looking East)

MINORCA RESOURCES LTD.

MAI

IMW

DDH#: N1C-91-10

0.47.138. 0.03 '/.Cu. %N. '/.Co 3G Gabbro 4P Peridotlt®

MINORCA RESOURCES LTD.

p~6°~°

0 ~0 0~1 pt"~

° ° 009 oPs pP

0fs'• ~ 0•~' y o~

h A s! ~~' OP 0~ 4' dh ry'P

0 a~ o

. oON

00' o~°' oti°• o~• a~~

Oa.\a °d1° ti

0• 0~, 0w. 0 od°

0(0' o¢L• 0 p~ o- 0~•\~ti~ b .~

00 ,~ °P °~ b P +,j~`• C~ o o

a ~ ti A o~

a. ° ~ 0a _ p• 41 0`

~ 01%‘‘•

0,~ p°

0,4

q o. ~ ad' .y

~ 0 0~ I.

tp\ ~~ o~o,~ Nicobi Lake Property Vertical Cross Section (Looking East)

Nicobi Lake Property Vertical Cross Section (Looking East)

DDH#.• NIC-91-11 & NIC-91-12

~ ~~. ssil, 0. 0 ~4>

o-~ o6` °' °~ ~,°~ o~ o z~ .O ti

0~0 ~ o~~ ~o~y,°~pti

~ ' D~ 03 °.

~ o~ ~ y' o°

°' °Q °, ~ ~ s~' ti~' n III'

°~DA~ ° ~~. pQo' ocQ~ 0 ~b. O.

p~ eu• b ü~~~ 0~ ~ Q~, ~~ ci' (~,

Dy 0A o` 0~ b~ ÿ' o' o~' \ p~ a~ ~„,

o► \0°°~ oti ~

4 ~° }

A\

' a° o o`~ ou`~ ~ tiy' ~`' `~

o~ ~‘ .~~ ti ~ o~ -~ ~ o~. ~ o o• •

,~\, ~

°~, a~° ti`~` ~ao

~ 1 ~ Os o ~ ~

re' ~

o ~ Oti ~~ti• °.~, c Â`

•ti ~h•

p ~.°• 0 ~ o~ a

^ S ~S.o-°yo ~~ 61'

~ T~~~

~1• c~ ~ es1,o ~ °,

, 1

~ p Q ~,.'FI' ~` ~Q1Q.~'

o 0~ a' o'° ,i1,,,

e ~' ~~,~ , 0A` ~1• ~D•

• a~. ,.

P

ô o ,.‘• • ,. Ory^, ~0 '?

o~~~ \ ,~. \ ^~.

1a •

\

`\r ,

0.47. 1.38. 0.03 7. cu. Y.co 313 Gabbro 4P Peridotlte

(vi1NORCA RESOURCES LTD.

APPENDIX 5

DRILL LOGS NIC-90-1 &

NIC-91-2 TO NIC-91-12

io fF%I STiCorJ G. FEar✓\

Loo- 6.10 G• Ge. G9PsM-.$2

6.6o F. Ge. (29W.0

(0.60- 4.5-1 rev. O GG G.9984.

1.153- 15.0o C. 62. G965et)

lur•oo - 16.2;" F,(oG. 69SBeo

16.67 - 31. roe- Co953eo 'D!' ,

o.S Pr d°;~ atoP~i : 9h0H

-

!'. aotC, 1•0o ui 41Co -,1

ii

0.27C. 0.50 A1. 0•olCo 0•p4 sr au Pd

MINORCA RES0URCEZ LTD.

DIAMOND DRILL LOG

AREA: a 19G. 11"'P 141CA61 1.9CE

CONTRACTOR: Fo/29GS &,Jorr

CORE SIZE: Bo. CLAIM #: 3So3252. PROJECT: 'Jlcogl

DATE STARTED: Nog 19,1990 lo:3o p.,,,,. DATE COMPLETED: /Jog eo,194o 1:00

LAT: 04-2.7°S DEP: 11+-12.1°e ELEVATION: DDH #: n11C-90- o1 BEARING: VERTICAL TOTAL LENGTH: Io7.oe en LOGGED BY: G. LoNG

SHEET: I OF INCLINATION AT COLLAR: -9o°

SCALE: 1,100

C1jsI.•1G 0- I. LZ O

I•LL- 7$•k`i ,.', Fi..lE- CoSesE. G09w~A G9B5•Co 1 civil/305a1~l

oF ^' $o f. PYP.raCErJE%51rlPryteoi.IT77.f?N

PL9GtoG4.09se, FEc.cssA9e f,../R9 7?ijrk CZ✓9e07- 6-ovjLl-4. Al.. -EPA'TIu.J : ryr•-)P4tEor.ITl7Ka ~ • Lor9144 c426o,•19T12Cfl. -NC u..slT Is •••.'

rt.4r-eAuu4 i7iG44)6400r - çaL.P1JioE5. PeFSE4r P1j.164- F-eoM 769CE.- alss/•Mw,9TEa -

semi-n-10551 VC- -Ib r195510E 9NL G°.JSISi

oIG P1GP~JoTITz CIi9LGoeqeerTTc, P~G•TE ~ S ~.:`. ~ o.o2Co

PCNriikvOlTE {41-Cot.*L?

ll•) l r`~oa~6aE~tr1/✓T. ' +o•xh THE:v,.11r r5 r.rtPjC?..LEr1C Lair-4 :l,gP19-11••JS- :-°•w Pd

ROCK DESCRIPTION

OaPr won

0.22 oak

ô.o!°A Pd o.t7 G. o.71a1 -

ALTERATIOIO. ST(TUCTURE & MINERALIZATION

LE 6F.51,: A• tbttEEccl.l / c coNTQaT

' ,%= 9 sraNaEe. +/-,n,Nce,91,,z9rr°N :.:a otssaesiN9Fd suLPdlafS . . t.:i= sun' .NJssiuF. - r►~SN .IL

E SPIItCAS . .

,~/.a F.r.yTioN ,/ Z•oo- r-p:io 5-10 % D1SS CPI Ca Elf DLLs T/JPaasqbvr r•e,o.M 3•77-5',So < Lo lo Pie. .s1 5%CP1 4.00LL-1

9r 6.3o 9. s+j~jPP co•.iTrjGr 6✓,ÿ G•foe..3G 1.46 9 r G2.36 or 35'-rt;q, LowFe. C°,uryGr Is si/qev If zo°Trsj, 9r b.bo

CP°sSusL~ yuraLtTs) n

6•30- 7.00 1-L /e F. Ge+ .Disg. P1,Po w G I% CPY

7.00 - 9.33 1 15- Zo % P. w 5'- to% CP/ (^' S% aP T4E, Po rv91 t3e P., , ouE ro TI)-E 7J6yFrEe- OoLoc Tij6 s,JLP•itc.65 oCCJe. l,•iTEesTIT197.t.y 3/14 ec✓r1.4-47' P)lX XI-5 •

9.3ÿ-j 9.53 ^' 101. Py /Pn •' Co,9eSE, „7Æ adT79L sT1, w

5.10 CP7•. 9r ISO 9 CP1 57E1.J6•Ee y L7.1 r•^fh,ioe All I -SM•ti t,Jta.E. 97 33°7'09. 9r 4.7s- 9 sre+,vGkR. of ntysç,aE Pe

Co.-4T,1 irJ6 TR. CP1 '' Te P1 occues 91' so'Tu9 . dl. k3- 11.53 I- Z.%. 0155 P. 17: CPŸ • 1t.00- 1l-Z,L) I-e°lo r=.6e.. Gts5 Po w W. 4. FEZ CA`I

LatIILL`I • Flow1 11.58- It.sb PL96.00q$6- FL000F11 10. 771E sF.crio.•l is 000'1PO5ED oP. 30-N0 ./o WYLCLof/cfA C•62- PiJ9G• 3

7HeeC, is No PR-EFERED o.tja:iVTrjTloi.) T0 TI)E ZoiJE • ,97-le-z-7 .9 Lri.•.-,L a€8 of Po es..,;rel. ri CPI.

I L.S6 - 13.10 F.6e•.3G Gty.>.yrio..vjL Ca..7r9cT -S, 1=6,.••1

Cqt.u.oin, cG9phi,.19rk• Cc• G~j s74+,46c.C.S ,9r ZB'TG9, 42" IS.-43"r•%% t 9Y 13•12. 9 Cr`i FIk,Ga r)91BLt.l~ Fvl,cr✓Gtr e8 ' Tcsj . PiqG Ft.oe£o G/4 I3.11- 13a3* w u.c. al" 23'1G9,

I. G. ^'-L ro . 9r 1`i.63 9 3'm/`^ M9%iuE Po sreW6Ge

9T 60' -fii9 • 16 .51- 16.6p tow oF P, r:.ru0.0Ll j/>Tro•.1 , ti Lo -Lefo',

oCraeG..lb 9s 1•47tesï 1r IfYL GeI31',1 Pa•S, • Ti)•ÿ Go,✓E Nis 9 PICf1-F-eiA oGIFi.IYjr~o,..1 of -33°1-z., . Fir 17.1g n 1,,,,e. al srr,r..Ir,eEe: 9r 36°Tr7. 17-1-17.61 rtgsst✓F suLPdIeo.ES c.o..lSisTinl(p t0Ÿ 4).->'o% P, , No'/. PI, Lo'/• Pei , s•r}gep uo , qr aa° st9 1 s49eP to• 97' LS°7'C9.

l 9r 17.6r ry Sr, .n' sre.a b~ c. or P. fTr e„i'Tc4- wT~CP/. Jr- 18.73 9 I v„•. C.C. s;ei.✓loF.e• 9; tX ° Tc.<j 1 .Z.% ,9 FF,.t.J

ûL.E4s oF P S Pl. I1.5S-17.4o 9 ~.,t.•:i cc. Ptt4;Ep dl1e.r.0•iE.

FUTcr,ecs 9r ,4s--1-c0. 2o.OS-lA.IQ, Sit:iUF,so zo..lE Ca04i,'9t.4;.•ICo 7-,a°jo CFI, 1%Po ..

grss'Tvj. , 914125' 4 S,n.+, ara-ce.. s;tuu(0(~,gTS7°rco

t•+ 11°0`I , L I°joPo. •lr N•91 9 L,n••.. -am sre+40fQ 9r 30°1'09 w L°/. r. 6C • CPÿ 7ë P. • 9T' Z2.o2 q t.+..r• sT2..•46E(:•'pF P ocwPls 9T C0g'7Cj •

FeyM eL•to- a;.oe q 4q,,6. or 95q. sJLPr)tOCs , Oor,PcaFdaR

eel. '`M9s51 JC cPi , $S °jo Po ~ IS % P„. ',JF. t7.C• is s,fgbP ..

qr..- 1'7° Tc/3. i lift :. L.C. is yj9c9. qr 3Fs°ra9- 8/N Lt:74-

Lt.50 ri}E 40,...,7 f.,,•.15 soBll rcT

g ASSAYS m

I MOMOROA RESOURCES LTA

DIAMOND DRILL Lif;

39•55- `it•oo c. Ge. 696sto

0.01C0

AREA: LE rqc -r it 1J,Cot 1.491cE

CONTRACTOR: F0It9G . 2,En}01T

CORE SIZE: BQ CLAIM #: 35o3.5î PROJECT: Nl cos t DATE STARTED: 4 'J 19 ,1990 to .30 p„n DATE COMPLETED: &id./ Zo 19g0 1 =00 pen

LAT: 0+27°5 DEP: fl+I2•I°E ELEVATION: DDH #: 14IG- 90- a l BEARING: VERTICAL TOTAL LENGTH: 107• oz. ,

' LOGGED BY: G. 1-0 ,4&

SHEET: a. OF 5-INCLINATION AT COLLAR: -Yo"

SCALE: Isio0

n ROCK DESCRIPTION

$ ASSAYS

ALTERATION STRUCTURE & MLYERALIZATION

Il•Zg- r-MfA 6e. MIa206gBs,Co.

549eP unPra. C° 179û 9: 39° TcB 5+19P.P i.o'..F..L 97" '13' TC.9.

3G o.atco

' nob d ! 040 0» 0.01c4 ozg1zvû 001 Pt 0.4 Pl

4-17. 76 P-rn. Gt. n,,iat:o9aa0--o ~ sr}Pl2.P uPPEE.- ConflaCr q, 33^'rC.0

549LP 1:o,afL Con/7kr 9T 3/orcj 43 -

oN.IWA.y ~~~~~ c9lekor./9f1 zfA .

51490. uPpize. 0..••103r-r 94• 6t° rr:9 EBCcc1AtED~~TIotJF.G Con17>'jcd..qr Ie7,5Co

yp•d1 C. toe'.. G935Zo

JDNEC: GonIT/y[rr gr 33' 7-cl) o.r4t cdnrr9cr gT GL°769 , scroisOeP

lB,•I-1-5t•8t F.6fc. M1t10693320

- 9r 43• i I .9 1..,,•, cPq sfe".1G4e e~.ws J. 7t:9 , 9T es. 1`i L.nm CG 'Sie-1-A.Ee- W./s IB°iC9. , 91" 21.7'/ 9 t,•.,h c>~ 31T+ +OFQ L7u9 , 9r 23•17 ,9 t.•w1 Ct; snG.de.f.t 9T `I3°7T/7 ?Aso- t4.tm ^' I/ 41Ss Po 7e coi t.oc9bl./ 4r 45.11 ,iS.?S 65:13 65%71 ; 1-L..n at: s7e,..t.ces Cp,.rrry,.uwb to-so Ie CP`/. 9 KaES 85 F°u.4,.15 ~3`~i ~ 73. ss' 7og. 1=ta,•n. a..5-.8.1- 2.9.'/o 5uuPr/Ioff fiiJOI,JG FP..,+oet L5-9o% rn/

c. GC- 36 . qs+. Sut.PJo.EiS aac✓L 9s i..rrEesr~ngL Flux. ~Se~cuq n. 7ij£ VG. d9s 9 .irj6✓E aGFi•7gr•a.J ou6 .35'rCg

- 9r 245•104 win) 9 ./96uE LC, aC yL"ro9 9r L><.7t ,nop

Cijt.P,049flu'D o✓'.l'Au. • Su/ tr}tAt Se.694cAo'.nv gs /otl0,•bj

2.5.g'.1- Z!i •10 io'/nP„ ` 1s9° CPI, SSi~ Po ) ..3-1 °10 GP ~ , LG IS- 2lo•Sÿ Colo Pe t ic) ÎoP,a),

to % 2.6.SL to lo o--to% Po 6..oO944.1j

1.6.8b-b6.95' 10'/o Po û z-5~. CP4, L6.9.ï- L7sSL ' Lo% P~//Pnt

ry ✓ .75 q.% Po. 4154- 2.7.66 1s--to% Po~

514 PI wa 1-47. CP r. ;t7 66- Lg•oo qo% Po 2o% Pn . 1 ?.8:36 30%.P0 , zo% Pn . LS•36- LS:SS 6o%Pal

Zo-2.5'/0 Pn. LS•SS-tg- .5 /o CP`I ,Z.%P. . -

e.8•65-- L8.7$ 15.-10 Po Lo >o P.0 l a /o 0P1. Lts.9q - t:ts. 97 9 t3gan oG t;o'/o ~ , to /o to BT â4t:9 L9• lb- 29.19 9 e9~aoF Solo ,Lo-LS%Po 5~Io% P., Ir 13.'1%9' c Fe0N+ G9.19 7-0-6 87 +o Wn15 // 7u9 9,.us 441yX

~ 64•39 . L9.49- 31.Z8' C•Ge. 3G Co..A'gr..Ir.•r(p LI/o

- F. folC• DIsS Po P~ w i G cri ovedx.L. wGr9r/4 C+9e6o.45-17F.r) t•tonn 31.53- 31.38. 7)}S nbyE oic9

` Fous rear••1 31..10- 31.'16 , g 69,41:, oF CPj P°u04.4$. ir/F do7rR taM aF T1f t: rau.e : Ftp'✓1 31.4- 31.5/ Geo v.un.

- CoP.E Colo letco.K.eŸ CP `fo% CP9• 31.51- 31. b3 , Sr79u. pout. .,J Cot.O. 9Y4s II TtQ e,nn or- z,-ti°Io ,155 c-i , L% Pe. 31.78- 31.qZ P1qG .'

FwoAE11 1!UnrntlN 6 - il' it ". 20'/0 c.p1 w lo% Po e1M,-7u✓6 7>)rv Z.oaE. Fto,n 3LA2•7- 3Z•32. lo'/o I3iSS Pa, Py . 6/nl 3L•3L- 3L.90. 9 Ft9oru2E5 Rifr40•-6 F+Por✓1 Iff- to. 7-03 . 9r 32.68 /j Z.MM rTer.JCaf~ og 701• fy(Pn?) 3010P. 5;0°70. 33..32.-3.31 q yj..10 OP Pn(?) 2aa%Po eunlS 25°7r9 . 33.yo - 3s. }S g was of: Lo / oi5s Po // Is rdE 9sNE

_ 33.77- 3,1.55 nlurnr,eo✓s 471eu.✓E î.'egcr'utsé5 17- 10- ic° rc9 rn,,.vt:' Po ,P

9r 3,1.6o .9 I w+. CS. ste4.uGF.2. C. 1r9"^'S &E6S oF Pn w 1'0 9.tp: CPI 1 a470-1•004046. Fe° ,•'134.7o-3S•Y7

G¢ouNp CveE (60-701.N P✓..t'cJEi✓l uJ11j/l ~l 7H1S SE41u~1 Ty~ qtf 9PfijS aF 1;-to% .:, Po 9,./11.. 7"tL

97' t:G.l+4 qnla 36.33 1." 1,•1111 1nII0tr P•9•ras OK Po --.1.7-c9. 3fo•-19- 36•5'6 to- ts°/ Po , w ,,r7Cefot9.J✓t0)G. PV/P4 3fl-1oo -3G•ht0 lo- 15"1., Po ` iy5 INSt.C669e.kdgPi P1w.

âb~o / - 21sc~

4.0SNt O.ObCo

qm 5.51 Nt AAao7Co

QVCÏ4 S75 Ni 0.07Co 3. bo C4 ô.~Go MO (4 0.111d

GEOFA6T

~ oor~s~

.5z..512..- .56.77 c• Gz . 69g3eo OrI'x Ca•.rtljGr a,F✓sC 7-IL° -rte.

Lowe. Co.•rT~ s64yj jr 679. -MO

o.33Ca o.570; 0.o1Co

97 ~° 7-ci) :

g'ESOUaCES ~~Da

DIAMOND DRILL . LOG

AREA: LE rqc 1 jP IJICoS I 19 CONTRACTOR: Fowyae_ eF,brr CORE SIZE: go. CLAIM #: 15"0 PROJECT: of icon DATE STARTED: r.lo'J lq 19go io:3o P,,,.r

DATE COMPLETED:,JdJ ad, Iggo ( ;oo p. reN

LAT: 0+27°5

DEP: 1I+I2.I°E ELEVATION: DDH #: fflCr9o-o1 BEARING: VERTIcRL TOTAL LENGTH: Io7• oz nn

LOGGED BY: G. l.orlG

SHEET: 3 OF 5-

INCLINATION AT COLLAR: -90°

SCALE: /!/0

ROCK DESCRIPTION C,

ASSAYS m

jo

56.77- S`1. IS F. 62 rrne.eo6968.e.0 uPP~~

co.J•-,Fxr s,},er 9T So° Tc/ .

~G• sti92Pqr32'TU4.

59,15' 61.3o c. ro2. 5.156e.0

sd9v UPPf.C. C,oaT/jcr 9T 32.°Tu3

Sr}r~j+ 1 u..14Vr.:,.r Co•.IT9G

61.So - 70. oo F. re1,ceoâ9SgP.o

s.}geP u46.04i.1 IJIP4e co , r9c-rr~r' Is-OTC,

sielaP t ouJgQ Co..lïljG' 3B•O:ÎC/j .

o.IsCru 04101 o.otCo

ALTERATION, STRUCTURE & MINERALIZATION

36.41 sTgl.uc,Ee04' fit" rPn gr 6s „° 1 Fpo 7'r/3 •

37•nFf-37•tlt 9 (s9.4o o% tS°lo Po lo- IS90 Pn or 37 °Yo",.

• aM 37.Lo- yL.00 , aJff9ü. 1- 4.10 P/ .J1'14 Sr-..oTia✓s G'" 1 'L~ n

Te. cri LoC9ud 9r 38.51 A SM" Cc sTe..•ICoF.G yTsl °

Tc.9 11o Cl,1 39.15 9 Ia.n Y+'1Or1G

s7$I ,J6t.e./AiICE 9r 56.°7c.9 w 5°lo j% 9T I¢o. IL ,9 LNv.n sre.146.6e. ce cP4 9r 37 .7-c.., -

'jo.51- fo. 67 PI.9G, Ff.00r~.A~ 39 °TC9 C0•✓7'ÿ.Jr ,.+6. 3-5% • plSs Po w ! eh hiss GP1. 9T '41•67 /9 IrnM C.G

SY4J J6~~ 9Y sio °7'C.9 Iiosr 15 '410Me47'614 t/je,ga,.Yjrl LEA•

-

43.7q- 9&.9L Gtd.,,rc a'IKi 9r `H°Toq (urce c..✓rgcr) l

51° iC9 t•.C. . 414 Is. -7s- i6•lo 9 Ffv.a rij4t414E Fo4c1✓CLS op et, red /4 LZ- 33°7Cy . Ir 16•2)1 9 2,•,+An B/f,JD oP

8o°/• Po , Lo% Pe) C✓.•IS 9°Tcsj. r-4o,+,t y7•L3- N7.60

Fouqrk0. 9T 38 °7-C.9 I- L% F.00.Ans Pi 1 w 1-eh F6G.

DIbS Po , ll.To roc. rouyrioa , Goc9r~-~.

Ir 0.76 I-L'/° F.6Z.C,u5 Py w 76 eu.Js I/ ro 7,21E

v.C. w,nJw 7►}F F.bC. ✓NIT: de.33-ciB'•9'I c•,.tty.lmc uPrEPt I4..t4L. Co4r9cars 41frioP 9r 6L° rcq I II 10.37 9 sM91L

69~+a oF Po -re. Pn t P9tfir•E+4 714E f ,p..irgcrs. •

- $liJ `jP.41 -5t•8L ^ `io°/s Pt.y6• Pef,6r,r7 .a LS-30°4 F.6e.

DIsS Po t L-5°L, F.6C. a45 CPI Loc9u.1

50.57 -.7 & G.6t6 GB65eo - 9urar.,n(6 u.C. s9gePq7- 63°Tc/j L.c. ^' S97eP 9x 52.°'Ib9 âr S-ro °lo Po -- S IoCP1

qs cogts>r r%/,I, B/.s 6esxusTD>(? Fe96Aler•+'rs.

s'1•zl Ge00,4A cava 75104.Ecov•Ce.ÿ 1î1,.15/•Z3' 51.-5s 3-5°w F. 6e. C1sS Po w T1/E.- 59mE 9Mou.JT oF

CPl rA,•lDdMc.1 .aGFi.17zA. . or 57.4c q F, foe• 6155' Pe ~/o 034~ z% rTq aT 17 e TC9 Possl449 FaG,a

yr 3✓1. a3 9Na rw4

$11S• -g- .TI. TO C:• Cae» 6966e01G h✓Tdc C? w 1~o r 6e •

olss Po , /.n.,.roL FP-e,.4 oZ.oS"- SL • ►ÿ � BrJn1p oF lo-JS'lo.Po w 5-Io r/°'CP1ryT /3°3-c0-

$2.8L- S+j.IL 2.0- SO °7a . F-M FjC ois; SaGl7f1a.eS

C°,JSIsTI••rG oF Is-io ,/o Po r 1°-75°l0 CP1 Locfyµ ~

g7 S3413 9,a13. 53.o6- G-1 srta.46+EX10 wreé :. 9T 3L° Tc)) CoMSjr4w6 ^' S% Po . 9i 53.15'1

Po srG h.164.e. 61 ° Tc-0 . tjT 63•11 y i m N+

- ~ P.~ : sre I.JGF,e. gr zs°7o9. . 9r" 33. g'~ 9 L n M • art. STeIiJ6Fe FTr 61 'Tr9 0,,•+19,,•rS 10% (•,P•/ 107.4

• 6- I%. 1-0O. " . . , .. . . . . . . 1 . ....

•70. yq- 70. .6c. .+1 ,cG+6B6•S2o

-10.74- ?I. 61 G. 6e- Gore,e0 . .

uF'PI;.°. C.r•r7yjw- srPje..0 9f Z6 ° r9 Ea,,lklr Co..11,:r S49 ,2? 9r zI ° rc} .

`uF944-4 W u97Ta. ~ t 7Ciy..

511•tIs 9 1-L.v,nn sser.dGk.L:oF6.O'/oPc,40/oPni3r 4-iS119 S~•bi

e3 1-ton," oF` 00% ro ,qo°lo 3j °rr.9- $+j .8`l 9 I,n,r% sTO•4Ci2. oF Le. ~ CP1 9f 57'70 ~ gr SS• zn

,r . q S nr1 syL.Jb~ op 410'7.GP I ~ yo /. Po , Lo% /'n 9r' 33 . Tc•9.

- 55.55 9 1 wn sreuJGF..e. or- 151. LS /o Pn (Pin )w

lo°/ piss oP`I 1,4 ►iosr goaa0FNfTo7it, uPfr0-4a4:9Gf1 9s

67° iG,q. 5S'. 68 9 xru.4064.0F, foo-70°l• pissP°

GE®IFACT. VN6.

I MINORCA RESOURCES LTD.

DIAMOND DR'LL LOG

,0:30 p,n• hod P M.

AREA: La 'II» Tt- l.rlc061 1.9ice. CONTRACTOR: t-oerjoF gc~.7o17

CORE SIZE: & . CLAIM #: 35ot.5Z PROJECT: 1.!ICo& DATE STARTED: go., l9 Iggo DATE COMPLETED: AN zo ,990

LAT: 0+27°S SHEET: `i OF 6 DEP: I I +12.1° E INCLINATION ELEVATION: AT COLLAR: '9o°

DDH #: 1.11c-90-o1 SCALE: /t/00 BEARING: 1/E?ZTaL TOTAL LENGTH: 107.02. r• ~ LOGGED BY: G. 1_at•IG

ROCK DESCRIPTION n o ASSAYS ALTERATION, STRUCTURE d MINERALIZATION

7 8- 80 - I o7. oZ Gegr.r1TE VPPg:7- Ca•.17.9C 9r 38 *-1-0.9. 8S .

u-Fertÿ o - 15% 14b1 solo Pe.96.0c05,E 1

?.5-3o% (3ugQTZ..

- 56.94- 57.01 Lo-2510 F./+t.piss P° w Mudot. (?)

51• 13 -57• 19 • N•rnl..JrH ~s s4qi 0-1 ycfi..) ?/i. loer--. t~

oU Pr/T>'A sT24.J6Et.s or- CP i..:r Po I - 2,,r", T1i1 uG . .3r s7.L1,4 lo% Po ,L-S10i-Pq 1-2.% PnC?) 71Ss. g/&.1 S7• 59.1•5- 9 CC F1u.CD 490e1.JE PL9cr'✓2f5

~ot,EiJr1~ 2xJ°TC.9 9•Ja I.oC91.L1 rJge9c4t£4. 4.7.; ✓Pf0

i0--1510 41SS CP `/. 9T S'I.87 Pj .B .,,+. Cf ./ sTPa.16LC.

0.224)1 9r S1° TG9 cpr.1JEL6ib W 9 L-5.•,.n Cp7 sr81.460Ce g; 1-15 °Tc9. or 60. Ce g I•n••n C.C. sr,e+..1g4.t frr ZS°Tc%g w Io-Ij °/° F- M. 0L DIsS . C.P/ 4a/.J.J ,.JB //7o Ir; ,.J 1-#6 .

_ FiusT'. 4.0. 515 - bo. 60 , 5-10% 01,55 cP1 9ss • •J CG Sre1..16EP.r sua 1/ To Coei 9y.6. Feo,.n 60.71- 60•76

9 69.-fit, oF y.M1 - Co.Jr/j,r/i.J& Fto0.+l6.•Ir5 }losi' CacJC. C6tf.,w1/jiU& ?1) 9r 17° rG9 *.JO. CarJ515f1.JC co: 5°10 CP ,'io % Po LS-3o°/p Pn qr 60. 98 9 3'.vun 8.9,.4a oP cool Po I 140

% Pn

4° rc.9. 6/.J 6t..10-6t.71 Csb.1 I••Iu~.v

~Jqltu. rE Ft9TueE>; 9f ?..N°70 - g/N 6L•16- fos. st. C?) c Ca96601G bJCd.✓s•o..r ? 1 u.a 91 • 57- r¢lg L G. ...i Gtb✓..n C 75 % ., ..

- - I-L•1° F. 62.pr,ss P/ 6.30.4.n06.J 64. 37s- 6S,90 i.1✓mkUy✓s CS-Io°/. Co Fit-ca. d91e44.Je.

Fe.,,Grutf•,S 97" • Jo' TG9. 63'.'13- 6549 Fo1.191'14 Lit ° refJ. 65;90- 66.n c. Ge. 6,9s320IG 1•4c.4._u310.16 4

or 6G•11 9 5......, cu L/cc. s7t1.16,te_. 1 ro C• j• c,o.,.r9„-1,N6

e l'/'° Po 1_0c9m.4. 67•06- 67.16 ns°SE aF g Face. oJTN.JF/,)

6`1 t5-Lo°% t11s5 r-1,4o2 Po . 67• to- 67• So

jr.' riÎ6 SCGr1oJ ri F&„./ r191eLwE Pk-lc-70 or ^• 13°TCg. 67.70- 68.11 r•1o6F.e97-CL./ Fou/jfFls

3q ° Tc.9 rn.r..Ue- P%. 61; .1- 6P. loo Fs 1.1 CC. sT~ I J6F,PS 9T 31° r~i9 ,/l 9s w(4.L 9s y covPll c>F cPy

sTP,.Jro~is ~-`%MM 1 96'Tc9. 68•60- a./ 3.

c. Cot. ees+se.o , ,..$y.c~y ruu9rFn s1° rc9 60:16,-6g.eq es 9150J€ Bur 97 ` L17° Ta9 . r9,. 7o. oo Te< eor.aroc.r iS rn,.JrtRqu7rip 4") lo°lo G. Ge... alss Po. 97 7 0.7`1 7J•¢ W: •

Cpn1T7 , rs L-S% F. (°.Os5 P° . 91" 71. LI 9 I r.,•..

GP to - LS °% , w •g T,o•JF `éS ° TC/j • 73.LZ yiL'/o 1=.Coc,fl155 Po t 7L.5`1- 73•12 ovF.elj1.L- 1-L"10 t>155 PnC?i „â Po 9 ,p -re. Cp% . 73.u-7'/•65' Ff...) cc. r-I..UrA. ~>ujd✓eE1; 9; to' rc19 yre C4 LocJ4. 91 1"1. Oct 9 l-i. . n Cc s.ne,..smce w 6/0 CPI

9r•+D T2 "Ingo 07 Jo, °TGy. /jf 77.o$ .9 89••16. •or C.P`' 9T 33°n9• 9f 17- 16 9 3 c•-... 6 494 at

/s)7t,.J6~fr,a= ,Ar 2t1 Tog. gr 77.70 f11

6t./P-1 .YF. nYr`E% srP.r..l[r,C.t 97 3o° TuJ. qT 78•. L1 9 139.Jo. oF Po ~ Pr)C?\ 9; 3G° TGj •

7fr•?JI- 78.a0'.a4rjKl- , f-u..4eb, // To c,.4.J1"90Y. a T~ E,tq 11TE.

7 I .6I- 7L.3LI F. 6e. 6A65to •

7G• 3.1- 73.r.2, C•G,Z.643,5eo. v.e . ~Ir-s1srL ~a sub// 7+F9 - iaM.(C Cor-.49cr s190 9r 6,1° rc.9 .

7s.tt-74.65 F. (ae. rniceoGgBFRo Ca~o9f~aJgl. eo.JT9cr5

74.65 - 75-.15 C. G!✓ . rofjtZP-O

(oYljDgrl.o•./ fL uPPF.e_ Co.+T/jcr .•J 9

sri9?O si76I/ Tc9 .

7s • 4~ - 7k• L~{ F. 69SSe.a 76•4(4- 78'•8o C • co2 . (9956eo I;PPEG C0.,119GT sr)9eP 9r 35' ° Tc9 l o.,cG Co.Jrqcr 549EP 91 38° 703

040(~,~ -

ROCK DESCRIPTION 0 m

ASSAYS ALïERATIO?4 STRUCTURE & MINERAUZATTON

7fs•6`i- 7ô.(p9 Zo% Po ~- 10% P., (6 q7 37 # 79

7$•1`1- 78'.76 sol. Po 5% P.) (?' // To caNTgr~

wrni- 77K G4&J1re, ,

~TKFso 77/,6 Ca,4Y9cf 7.1A. (yrs~,drle

ro47'4d} Ii.J 70Æ S~~L 0.04,c1-104

R T 71•&5 9 ini..1 Br9vo or Py gr 36° To9 ryT ,9 33.10 or• Pi el. 36°TC,9 •

E.15.14 io7. oz r+-1

E .o,~, to7•Otr.

C

CORE STORED A) V/H. D'OR

MINORCA GD3EZOORCES LTD° 1 DIAMOND DRILL LOG

AREA: ix ”c 7«,v , /1lco& L JicE CONTRACTOR: Foe9GE. eseauoir

CORE SIZE: &a CLAIM #: 35032,54 PROJECT: NI Icog ~

DATE STARTED: ,46~ lq 1990 J0r0, P••^ DATE COMPLETED: nS°J zo 1440 1 : 0 P. ,n

LAT: 0}2 7°5 DEP: II+12.1°E ELEVATION: DDH #: n1JC 90- of

BEARING: VERTICAL TOTAL LENGTH: 1o7.oZ.•-1

LOGGED BY: G•L0NG

SHEET: 5 OF 5 INCLINATION AT COLLAR: —9o°

SCALE: MOO

SAMPLE FORM DOH*: 141c-9o-ol DATE: / - /2 - 90 SHEET j OF Z t RESOURCES LM AMON tilcQbi L4kE PRoPER7y

FROM (m) TO (m) SAMPLE +t LENGTH (m) Cp Ni el:ki ego Comments 104 Co

I.~O Hb z• ~ 47.< n.oy 20 3,S Q•06 0.12

Q•sg 0.230.12 17e}" 21 1.49 _0163 0.25 3.77 -71 17G,36 • Z$ 0.10

yi •50 3.77 .0,07 34 I 76 37 o • 7 3 0,22 1.014 0.03 ~19 ~ •so I . o 0 4.1~ (').7I 2.0 01.09 6D .1.11-1 17G 38 • 5o 0.02

1• So , 0118 0.35- f).(11.2 _ 7.00 5'. So 84 3'2. 17(0 39 116 1.10 • )•ao 0.19 0.85. 6LS ,0.02.. Z_S 7.00 0,02 ~•o0 i_L 176 411 o.6-z, 0.y3 1.01 3,S Q.i I Un $6 E(.5"; 0,02 • 0o

3S 0,28

9.33 3,0 0.n-1 43 b.11 4.19 4.12

O,S9 O.%S n.1o, Q•94

6.02 S. 5; !~• °d~iy /t 9.8'3 0.5o 9.33 0.02

33 6S 176H4 1•5o 0.11 O_IS I1.3 9•e3 2,0 0•011, 9 2,Ç tZ•oo _a. 67 1).0ii 0.05

/3 • 'r_• 0,3i 030_ 176 L15 gig -0,pi q ZY 11 •3~

~•Sb a4 p.t1 _ ~ 17~y 6 AO 77 1 Z .00

, 13• 16 o . 6o <6 IZ.56 1767 3.0 VA, 46 0.11 r3•16 . 17 6 y8 3,4 0.01 37 9.01

a,9 n,QS < 6 171-19 0-1•bg 16• 1• ,17 0.11 o.lb S.L 23 )7• ZLi )• 09 .0,14 0.29 69 a-s' 0,04 27 176So 1 6.15 , SI

IÎ6.5d) I"7•~~ pt. in ~ ~G 17. 77 0 • _0.07 h9b 0.0 3.0 0.02 0.1S_ 14, oo 1, z?, ~,OS•1. 1.S .p101- <6 17 6 5i 17.77 7

S4 880-52. 1•5-a 0,10 O.I2 I 7e.53 176 54

.14 0.03 < G, 19.00 yt 1.9 n.02 4 t, L l • 7c _ 1• 20 __0,06 -0.03 to • So 26

y9 zz., lo o • 5-o _,,,Q,20, o.2I 2,3• .:)L O• ga.. _14.9 OM

a-s.0•12. ~ S6 17655 L) .7o a 6 007_ LOS 6.03 ,1.08 '

3y 0.02

Iâ' Z'y- 77 o • 75- P-12 40,02 116 57 Z3•oz 1.0 am ~6 z4 .90 1 • 0.15 O.oW a7 17rn -518 Z3.-T7

I705 9 a4 • rto, 1.0 x.01 (b j9

ab 0 ,9 C0.01 <6 2,5•.83 0 • R3 _4.11 0.02 2.15 4.OS SA" 0.26 036 7G6 zS•egS Z6 8S 1, 00 0.06 0.t0

1. o0 01$0 5.5) 34- Q,.4S 34 0.19 Z-7 . 83 17ro6 •S3 1166Z ~ ~7•83 ~

0.07 3.0 0 , LI 7•0 0 • 46 1.0 40.01 IL,

21s•8", : 1 .00 _.0.19 .5,15 041 o .6G 3.60 1.02

3) • la , 1. 67 .1),(15 zs. 83 0.19 0,02 rCoG2

I`ït•od L9. Nq 1766 31•18 _

a6 ~41, 1.18 . 3.17 0,27 7.~ 0.15 0.1S 83 3Z• o0 0.12

1.0 n•Q2 L ~ 33 . zz I • _11,07 0.2o 11666 3Z. o0 2g 0.! I 0,v1

.(j.12 ,0.05 0.1 0.o3 a22 0.23

17667 33- ?Z.

1766 $ 77 17

P)6 g 114.10 _

.33-77 34./o

o A pa,;1~t 1.0 0,03 g <6

3S• 97 1 • Z7 4.17 , 0,27 3.y 0.033 4 6 <6 11 17 67o 15-.97 36 • éo o . 63 0•06 014D__0. 17 6 7 36. tio , 37. 2.0 o • Go 0,25 1.24 17 b7& 37. Zo 37. 90 v. 70 0•12 0,32 17 67 37. 90 , 39 • o l I. 1 1 0.03 ,0,03 1767 39.01 ?9•5"5" o•$`1 0.11 0.34 SO ) 7 67 5- 39. $5 Li • .5 ii _ c9 . (ill 0.03 0,o3 17 17C-,76 No•$q I-11. 0., o• Lla-

1.4 o.02 46 <6 0I a•9 0.02 12 ._11;4,0 o.t2_ 0.02.

44 a. 0 40.01 41., I.~ o.OI, (6 ai

'c>;ar#2oob 3.9 447474I.0 Q1`Ig/.t

41 • oZ yZ. 00 : 0• ~i8

yZ . ov

/43.5Z, 1• Sz ti3•2 oZ o•5?)

17 677 17 673 17 7 (1 GEOFACT INC.

N1Goa1 ~.A~kE PRoPERry

SAMPLE FORM anH it /J ►C.-q® -v 1 DATE: 1_12 -Ÿo SHEET a: z OF z

MINORCA G~C`'~SC~CG~S ~~.

SAMPLE a FROM Cm) TO Cm) LENGTH (m) Cu Ni Ag Au Pt Pd Rh Comments

176go yH.oz 4,5-- 5-6, 1 • 5L-1 - 1768 1 115• Sc:, J-16 •.Sfo 1. o0 0.04 0.10 39 1S 13 CERT.119.0o6

Nor uSfilyt0 17 6 8 Z, %• 5"6 H7- 76 1 . Zo 176 83 117.7G 148-.77 ,_ 1, 0 L 0,07 a.06 -71S n,S 27 ~i.~ gook,

,, 17CRI-( Lik.î7 49•56 o•7°i 0.35 0,39 0.01 1.5 27 17 bs5- '19 .5-6 57 0.11 I - 01 J►+or 4srivE.1 I.7 6 FS(c 50.5-7 Sa •78 0. 2.1 0,23 0.26 73 10,5 20 WU #1 9.o06 r168-7 So .-0 5"1 • Z1 a- 4-13 0.or, 4,05 3S <o,S 1 ., )7633 51• 2-1 5-Z•0 f3 • `17 .Ib 0.09 41 <o,s 13 •1 1 -7G39 5Z- IFS 5L• ~~ a. ~6 Nf1, it)tllt4/0 17 Co 90 Sz. 64 5-'4.65- J. 6 i 0.33 , <0,6' 2:7 Mall g.o06

,1 1-769i 54 I. LS' Ss". 115" I• zo ad) 0.09 27 <O,S 23 1769Z 5: 5-. 'IS 55-.77 0• (a-S 0.65 l7,6g D.o9 as- (1.28 3)t .1 176cj's 5:5177 ~ 57. i • S-e„ #•iT 6.i.2 43 <04- 23 ~ .1 1--761L-1 57.3o 58•8Z 1-5-2- •.0 0.20 56 40,s 23 ,1

116 i 5" 58 • g L _5'5 • 67 O• mar Asr,~yEo -

I 7696 '5-9.67 6.0 • GI ~

8'5- O. 940.56 0.05 22 <o,S S33 • Gf,Rtr;#~a6 -

,► 17 G97 60• 61 61.z.,0 0 . 0 5 0.15 o,4g 6,02 <os 17 11 G g Fs 61. 30 • 7g 1• -1 a 0, os- 6, 03 2 S OS" 10 U

116c,11 6z-79 61.1.3K 1 •S$ NoffttlRyEli .. 1110 0 6'4 . 38 65. go 1• 56 0,0 6,02 22 46 ,5" lb CERTi. #1 ace6

- J1-lo 1 65 •qo 66•qo _1. 00 6,Li.,S' 0,04 13 ‘‘ 17702,. 66. 9'0 67.70 Q. &o NerA1:01yEd , 1770 67. 70 6 • 60 O• qo r.D7 0.IÙ 39 <0,S 13 r,a5: 4ao06

N~i f1•7r,44JE.D 1770 14 h8• 6o 69.q9 0.a9 177oS" 69. 1-19 71. 00 1 , 5/ ,, I77o& 71.0o 7z•57.1 1 . slt 0.o9 0.13 LID <0,S 13 cfAtG'496o6 I7707 7z•5 7,4 . 00 ►• 46 .jvOf A.uage

1 -17o8- 71-1 ,0 0 75'. ) .5a 11-7d 61 '75' -So 77.00 1.5o

I 7710 77, 00 a. 7~ ., 17-7 11 77 • 75'

77.7,5', 78".(30 1. 65- 000 0,22 19 <o,S 13 r.Eavo-dcob

17712._ ig-go So •o9 1 -Ll

~ INC. , GEOFACT

SHEET: I OF Li

INCLINATION AT COLLAR: -qS°

SCALE:

~ 3o ~ Goth

DIP TESTS ,11,5 o

LAT: DEP: ELEVATION: DDH #: n,I1cq I — Z. BEARING: 1$O° At& TOTAL LENGTH: Go r LOGGED BY: G•Lor.IG

AREA: rJ)co i L10 CONTRACTOR: (r CORE SIZE: B.G1 CLAIM #: 35c325Z PROJECT: niIc,og) 1.49K6

DATE STARTED: ?2-!1 IRI DATE COMPLETED: za.-/oHhl

MIlINO1~CA 1R EZOURCIES LTD. NIC-91-2

DIAMOND DRILL LOG 8E0FACT

METRES

(m)) (m) SMJvBÉR

FROM (m) (

Tm)

LENGTH1 Co (ppm)

Au (g>t)

Pt (opb)

Pd (PO ROCK DESCRIPTION, STRUCTURE & MINERALIZATION

r`1Q W vtr - Cvf}eS,G GP/91NJC11 G9iefi,e0 - ," 1EDWM 7o 0r942X Cvt.OR. t ("JO dPC wd P19.3-t ove. TO Co6e,SE (A~FJFA PJACgOU9y CVMPoSr)-io.J t - -Told HQwcEnrC 3o-yo cf Po6toou9SL .

r9L1W)770h+ : 4-309kr ..AoNF2-0irEL1 C.9-D6+a.•J9TJZEo. ‘ Loc9c4-1 9rr)Pdil3o>_m2a. ,

LorRks.4 N496,..s<TJc. dJF~U. ,S-Teu,•revg./ M96n/ET7G boC'9Lt-~. MruF.r~,►azgTi~J '- •il9Q.i F5 , L.4sc9t44 rein" !la n,55eett-mt.697-56.

-ro sF✓~~ .+~5s,.~E . 3oLP4-1o+E6 vccve -35 P~IMqQ-~ nJEzr Trc.ocTue,C Fhvn ',a-noglLl TC.X. 5NcJNaeS -

r? vr~ Pr..►~ cog9iaJa. Voes10...3 of:- goVFr ,' utJrr

c,.q%..IG 122.-6•1 cidMin/50-1- VartP.E. vF.bi co9e4E. GeArrvioji Pyx . 9r Z.5-019 ,

~~,~ ~L sjeJwoce- '97 2D ° 709

8•~ft~ !'lo hiss cP1 w I°fO 0I55 PU

-tlri- 8701 rnicRoG$Mo , Ge909TI04.91- C0,47-39Ci5

9-. 49 Pos. Pwaa,-6

Po Pr P~ Jozlo (.a win73~~ r`edM II rvve. - I vw. /97. x• ss"77-09

re:

(g7t1

'337z,

93%3 g•-

.0

0,13 0.23 01011

0+Z7 0 55 0•01e o.(a

, I .~b ~ 0,81 v,fl~L !~7

DIAMOND DRILL LOG DOH #:/QIc9k SHEET: Z OF ~

SAMPLE NUMBER

FROM (m)

TO a

LENGTH Co (ppm) (g7t)

Au (g/t) METRES

FROM )

(rt0 Pt Pd (ppb) (p^ ROCK DESCRPTION. STRUCTURE & MINERALIZATION

IO•Zo ' 11.00 M9F1G p1kl;,~

uPPFJE'. SJ}oeP gT 10°7C9 1 LowEC. Cor4790rgT .

I~.o -- It.Zr•n 1% Alss CPq L i °>'o 6155 Po O./~/,1,. 93%y Ij•oo 12..20 i• Zn (arMl (~,17 (?ri.~(p

!Z•2t0-' ]3•!j . !'io toss Po o.,~t,i. Loc~LL`I Z% CPA

`I • 937$ 1L Lo 0,11 t7• ~I 0116. (jr31 0+009

Pr_e1CoT )'.F'G DItCE (S.FPPri.,rTi..l t2éA, 9âl4o 13.11 l+1.Lj I' io rr )guvE- Dqa+~ 111.40‹._ ~e sd9p1 ws7~F2_ `STea,.,~a-V rn94~Ic 0.07 ~,12 O,OI)

Cor4)19J4s I°/o A155 CPI Iv1lNUe- ~o Lf)C%91.44

UPfK.d?. a°4.7.",3o,r r.vT vIs16LL ovE_ To €2.-Oc.t=1 Co,2e lcr,.~.E Ca "IT 9c-T' S3rz9 9r 45° 7c/3 •

15.55- If0.62 I-Z°/o pssS CP1 W Z-510 rots Po 9377 15•55' 16•6Z, 1 .0/ 045 0rZ3 O,Oc.~6

16 .62,- 11,14 or KO •70 .g sm9w FoLo 937e 16. bZ 17.1, 0.57- 0+12 0.39 p.012 I °lo P° 1-fr, P.1 ., z-;Jo bits Po T eel ,t,! 40sY

t&KSt 9 •5-""11 e."230.Jyr6 50° 7G9 •

F,t,.oin7 Ig.3a7- 19.So , solo ezCuvf.e4 iq .SZ~ ZI .00 3-s% F. Ge . pi 55 wei9e4 C9tisc)^9Tl7F.A 9379 I9.5z LI .00 I•L/9 0,1I 0,z! U, cto7

ZI .00 -- Z2,•Sa gs 9gQve, 9T za." //r-Et9 c.c. 4e9te_u„4E 9330 zi • oo u.So 1.50 O4S ~ Q, ,.7 01010

PP3IrItiedf6 91" 15° Tv C•+9.

Z3•Z.4- Zdl. Pty..) t Crre. ti9ivoS aF C Singera 43451 z4,19 (3.gZ 0+13 à•josTtD t9 Ms ce.v6c9ggPo • T33-E it9,.,o5

0+I7 0,006

e% Po ?G o. PI *Nis Z7 ° TC,9 • FF,....9 +~

c i wEa

149J e24,46 r-04ave•aS /~TT~E Srri-ioS

2`i.1$-65174 lo- 3oqo DIsS Sut-At11DkS oJer.09/-1- ' 60°/O opT4ï+9L Svi.P410+0 is Po as-To tS CP`f IS ~Io tS P+, Co, ,

Rr Z-{. ..jÿ 9 2r•,rn P-1 sïP-046a 91.--- U5"7 r-1) fgï 2,14. 66 •1 yMN. (3lTZ./Ce. s-12a-%~ 9-r 6o°

Zs".00- e5.67 2.5-30% Orsi 5ut.ptha:"S o•JeXAu- C01.4 ,5T7•46 9302 Lÿ.00

ac is zo% Po S~ c,r Ole P►~ ,F6") SiP.t~6F,r✓S w' et) 1Pufr ,o21f.h1rf,lIDN

9301 ai,le ts.00

Z5.67

.G0 0.28

14.00 0,37

DIAMOND DRILL LOG DDH #: SHEET:3 OF Li

(m~M

NsETRES

(m) ROCK DESCRPTION, STRUCTURE & A~NNE SAMPLE

NUNLER FROM (ml

CoRALIZATION TO (m)

LENGTH (m)

Cu t%)

N f%1

~

[y~) (g7U

Au (g/t)

Pt (pit)

Pd (

3o•33 3?..•5~

Z$.(07- a7•0S` Nvrlg,gaas C`Pq , Po P/Lt.¢A 4+91eI.I,4E FQ9czve,e,S aJ c.,em..L tfosi» BsI 9 ~iA- be • to9~.o \ >sg+e ao/c.ive.F..i ïekt.s ^' 'lo ° 709. ,yr es": 8'$1 /j .s-0,-, C.I. S7 -grnr6ce_ 4T 6-rT0,9 .

2.1.0r- 2,S•5I, Ftw Seer-10.4 OP F. Ge . Mtceo 69,e,390 w M.P.0. ‘Pa55161-•1 g3.rTat.4T.85 i FF.s,J Ir±l+r: Ge.. S7P-s-.I6E.P-S; 63" 24/91-0L '9(A2^'6 (,a d) FE„ J CP1 t Pa FI t_l.€d1 F129a✓eZS 49,4,4 (0 Ti}E Sc'qe Ti~.,.JD -

Z.ïr.so -Zq•&`f C.Oe. GvyBgPo w 1- 210 biz t!P4,rr.Js,sqa. t°, l.oc94,1

9r VI•L13 9 tev+~ e:C srvmi6ret 9r Z.V. Tc,9 9.3135 zq.sq 0 .~ ~•~, te STe%~ r~c.. 9~ Ls' Tr9 ~ '-`"

rnlc2ofi9s&e1O

0,00.3

or

1382

9353

9394

9386

9~o3

"Sol

~~

~~ 7

i3af

93137

°13A1

93133

O004004 001 ~o,:.)5f0

a.4".67

aims-

2g-S° 29,$9

310

3Z• 33

M.lo

s‘1.26'

Wa~

3S•~1

36. 419

37,L3 .

39.4.

55'.71.,40.(40

"L7•os

Z1s so

Z9.8°1

31,17

3243

33.~

s5

s5-0.5- 0,Zo

35•)

36'a° 37.23

3B~Z 6

31r7b

1-8

i• 4$"

1•447 429

1,36

o.°IZ

0,7S

0•Z6 0;78

I.OR ti.83

I.o3

0.50

I•G`i

0.07

0.12

o112

0,04

0.03

0.36

0/44

4,21

O.

0,46

0, it:,

0j•~

Oa

0,05

O. 11.1

0.07 0,05

v,02

3. t79

3.9.5

2,LIS

3,78

•5, ~

6s46

O,s~

0,53Or~ ,

0,15

o4,03

o,00s'

0,t1c?8

0.003

D~OS

i3I07

0,06

o,lt,

0,10

~j.0j7

0,00‘,

V,U.s

Oiib

006

VA

0,07

0,1

0,1

u

NA

.; c,, , T,

6,018

10.43pt

uPfee Co-s/r9or Qf-LPOl,ra-4 sr}+yer- 91" So° Te-09 . LowEe. Cor4-0-Crt"ve9D[jTlo,d)L i91- ' 31° "Tc-9 •

SErn ~ rvjssl.lÆ s~r.Pr}trx s r}oSrF.~ ~ c. 6e •G%/3020. 'tUET ujcC ~9 leFi.l 7z~ Doc- TO -514€ SUI-Pl}sDES E.nsc.csr1P53tw6 P` T

DtpXJP.

6e91-15 . .501.63411105 t'O,•ISiy dF 19-0101 D0 1 10% Pn 1 -le- 0..P1 •

59Me 95 9g41ve 1(iur vF 7*€ SvLPti}at>FS wrr►}'.^1 74-1r

'9`'11 rn9551J£ Sec7b.•l 7*C.- P:24)PvRysvi.1 Is hpC47 7006 A,

Zo')o C1"1 IO d% Pv1 ~

g5S C Sv~PI~,,G/~Eô . i 1~T 7~)CT~ , P2oPaLrW rJ OP 1 ► M ev

~

ulkf} S >I D~5 6o %cP 1 , SO `VO P, ' t I o o~v Pr),

~~ 95 •96/4€1306

St`Jnl nM3SSIVE Sv1,Pt}tA~iS • Pk,uF'• orsUI.AItIQ~iS ; Fo%Po ` ID -15-t

Pr. i S1o%~l.

FG...3 ÷3I4,0.16 FoFT''vt.t✓5 FILuFA I i CP~ sg+J~ to ~7~ow`!(7

3o°7c9 HNIj sus- P~iLLEL 7t9• T13eâ SEj..7lo•.,' IS /9MP+)16oLlTITrQ9.

3-S% OISS Po ►}osTe'rD 0 C.. Gè• GA$&d,A,,M~~rr

o ss Po , w'.ocyL 119,24.4,-le FQ.gcrv~h PILL-0 ►'~ `'~l PILL-0 7eeda+4

— ,1o° .7ti3 •

DIDH #:/4-td ql-~ DIAMOND DRILL LOG

SiiEET: 1 OF

SAIvPLF NUM~3ER

Lvt FROM tm)

TO fro

LENGTH (m)

a, 1%1

N P/°)

CO (=nil ( t)

A" (9/t)

Pt (Pcb)

Pd (pr, METRES

FROM (m)

TO (m)

ROCK DESCRPTION, STRUCTURE & MIrERALIZATION

.

o•14O

. . .

'11-00 MIGito6F}g.geo

93$9 931~

cm')

9313

93l r~ ~339d 9~i,

~316

g3i7

9392

931g 3393

cm/

9399

`~32o

9395

93z..1

y3zZ ~,~ °~?L~ 93°7

93ZLI

9398

1-ia' o ~i9,31 i1.,3~

+iz.09

143,00

1-13.4)

14.S•39 i6.17 K675 9T.00

`iV35

49,1.b

s1,38

SUS

511•10

5`i•`i`i

55:3i

55'. ~.~6 5753 57,95 5â 90

59.c,~.

'14.97115-.M o.~iL

49.(91 so.yL a•JJ.41 515$

Libel ~

43'lo0

43140

HI. TT

46r97 146.7s- t9~•01 `I~.Ks.

Ill .Zb

49,a

Siido

s"`i•44

vs-.8

s'S•73

S6•ya ,...7, 3

~7.~~ Sir9b 59.(47

1.5"0•7

5-e•6' 1•Z7

~1r9''{ 0.-i5

0- g r

o• go0,7~

1•s7

0,7g ;-3$ 1,26-' o3s

0.9I

0,35 0.e1 9,56

1,y5

0.3~

0.9q

0.36

0.b~ 9.13 d. ~L 1.69 0 •7o

ds39

~~9391

(1,08 0,L92

0.16

0,25

0•01,, o•aS o,Z )•~

u,29

0,417

0,W

0,19 p,oLi 0,31

0•05

0,91

0142

2,141

0.32. O.Q~ 0,18

U.o.S 0,23

a+o3

0'07 0,25

Q,?.S .

0,5D

d?S

040 v.tyS v ~ U,D

y

3.S0

1;77

Or24

1;71 o,Lb f,32

004

0,46

U ►op1

147

0.43 0 ~ic. 0•3i 1143 ow

vro2

c~.ajS 0,~

0,0139

0,0110

0,U19

0,Ot7é vao~

~

0~4)09 vrd~ u.i7o5

o.00S

o,o2

t~rflil o.pJ~! 0.0Z3

o•oüy 0,071,

v►ov~ .

0,0B0

0,0

0.pt1

01006

.

c

i

~

. .

S1}3eP uPPEL Ca4l9cr9; 43'7c9

`63°T~ S•r}+9PP Luo,lrt.~ Con,., At,, fff .

°% .~,~ Po ~alo pis~ oJ ~S ~~1 ~ ~~L. gr HI.Sg >9 3-~.~,~,

0,03W►

15%

195

STit.+}J6~ 0~ ~ 7 ~ ~ ~ Lie TGf~ .

`:gn)E OS ,980VE

CP1 1 5% Pa MSS • QviEe914. . ,931Z-

eL~ovE

Z dlo p,ss CPT \NlIh1ae. Po aor,/66,14,

1S~ Z,o BS0 ~1ss Po .

S~1 ^~S,JFSutP}pES, nEr7~cTv~ \ ~~t,~c 5 r~ ~s~sr a~ ce,-,5163- 6010 Po k goo/®t:Pi

oT L}-,15" i9 SCM+1 6P.94I77C. bad- 7e-ire 19 iLiS° 7C•9 ,

t.091.1.4 SrvY)INl66•51VE ~~..X~'Io,,.,S ,H~,,f,,,54 1..i/,.,& ?a% Po )2-3-61:2 CP9 \ Z'lo P,.. . ,•teT 7tjcT,.iErt5 '•-eSs(.".Tr e,i 7 -4cSE .S.Ec..TI cvJ$

10 4/0 ass Gf.ÿ S'lo ors5 r., 1 OvFocl, 10 'l0 oiss et,/,z-~.'„ Pb. I~gwy .~~✓+n, iv -

P0 MN* Tt}£ PCfDo.^1.,,.,~,~...T SN.PV, DC• ntET 7-6X7vaf,

Pr•~r'viS• oT SZ.Zo ,9 6 tv'e-.;C-T ga..emh.) e. 01C7A/Le .5-,rcPlj it>e. bvhJ,E is fe.,C5S74:r i 7`Pf-oialaG 954' 7-091

~L L O~N~ 1 M F+jSs)V~L s~l~ ~i~ . CpN Si~eN~ 0>c ~o % n, t ~O /OC

~

~ I 9r 1+1.76 9 A vr~n ` 8$n1m r;;;. CKS C.P.:' 'e ierr.,1/405 ,..15.7-49.

5S• Li9-s5 -•S? 6e.Cccig7fr:. SiEcrio..s û rAi^F- sO+..44},ptS CAMPA-Isp.IG

Tyz.. rrlg-re.ty... • 70 4)0 GPq , 3u°/n Po M ~o~ Pr1 . o ~ ~ L.o~-i 40% ~KS SuLP!, 3~,ES t~NS15Tlyd5 .~ !'~k.7L/ 1p +~ M!►,}~J•

cP`i. g; 16.0% q 5~z~ ç 5ui,P►;t~ c~is 9r s'7 Tc0 .

L.0051L1 di-EgSaF rIqZ;;;11E s+at.f91AES • 9T 57.6c 1 Z.Sv." L.E.►s

9r L-1 1-1 61 T'c/j •

,~ , LA c9 L I~~S ~ ~~, ~ G~ ~% \ w FE~ (LjN~ M1-`~ o~l F.~7,CL~ y

~~1i'~N~. ~c7'u~~.. . . . .

. . r.`µ7

G~ 11m©hqCA AE s~Ûa_'1plClw LtIrUo NIC-91-3

DIAMOND DRILL LOG GE©IPAC ü üûJ~

AREA: Ni coQ ( t,9tcl=

CONTRACTOR: Foe.136E ez' ot1

CORE SIZE: Sc CLAIM #: 350Z PROJECT: rQl Cofb.1 144(E-

DATE STARTED: L3/o`{ ('ii DATE COMPLETED: z310î ct

LAT: DEP: ELEVATION: DDH #: t,lt~gl-3 BEARING: I Fso° 9z

TOTAL LENGTH: gl r, LOGGED BY: G. l.on1G

SHEET: ` OF (0 INCLINATION AT COLLAR: - 65°

SCALE:

FROM TO (ni)

Co (ppm) (A)

Au (g/t)

Pt (ppb)

Pd (ppt

METRES FROM TO (m) (m)

ROCK DESCRIPTION, STRUCTURE & MINERALIZATION SNUMBÉR LENGTH

(v.) (%)

re. . rlEa vM TU h9e►c Get;Ri.t Co[.c+C , r, )711-re.) oPFwrj 17t. bye- 70 P1.HCoioc,a.9SrE . CoN1Po5trlo►J ; 6o-70 % G)-4"6 u`r(o% 6,9Gt~u~gsF

Gj1,7es't8710.4: wF.A"- Me#aF..lz9r61 -1CAe,Sa~..aA: Tf~ L.ucfjuo f 9^'1r39-tgau rt Z,F,o .

w0)44 MAratrlc a.IF,,P~yt,~ LUli914.4 ,SmooNfoV`f rit9-(ovF,,,7-IG. MraF.~?i3Lt z9rt 0,.l Y9e.tEs e.d chu-ÿ Peo^'t 110 To 5F.M1 M9SSI~/E

Sva>8IQ4 oCca.ce. ~S Nf,7 7~a~TJ~~ I~J T}}iE .r ~tM9E.. SrAytt Awo HS s`TEi^Kotes wt}F„2E. 74(4 ' ti9vE Btr.t QErnoB)LJ TF,A. -Are svasr}146s r•Ni ~L~ ~~~ae~~ of FiQ(>Na9^IG~. py~Dir~

t t CN1 t..8r‘/Ot, •e M'^iae. P,/ Te. r d ,

rIlUn6g=eo - Is Tt}E. ?ewn t1sgr) Foe- 11j'E, \IFJ24 PUNIC' 04:41nap V/4 CT- w~Te~ ?l/ft OeSC3N/Z. l fIGNinV‘iCZ. CnnnPtfs ,7,d.J.

Crf.sicJG

9r '~ 3ZM t got-t9rtot.► 91 6Z" TC9 •

9r fsïs3.r cC sTe,evoev-Z- 91" °;7cg • ,

gIN 04.0..1- .Ça M :"vMctotiS F. 6e..5EC=T onlS NcAce-Sf.Ji t. Tt-he C. Ga. G981Seo r1i 'Y PasSrSL~ G~+3B£o 9u7"uuTt.!>-

O $0.2,6 Co

DDH #: r•1 Ic.91 - DIAMOND DRILL LOG

SHEET: Z OF

OM(TO FROM

METRES SANPLE ( m)

ROCK DESCRPTION, STRUCTURE & MINERALIZATION NIJlVBER FROM (m)

10 (m)

LENGTH (m)

Cu (%)

N PM (panl)

Co gqy~ (g/t)

Au (g/t)

Pt (ppb)

Pd Ipr

1-z10 DISS Po 1 i L)% oats Py ,T!>_CP,/ ,}osle> gq g.l 1a,6`I F. 6 , F)nl0 G. Ge . 6/~3P..o Cg~~19 i 19u7a~}3, 1NTeLr~1t~C g%N Q

Z'/o olss Po w Te. Cp,i ovF.Pi~yL[:

►(a.sz- 16.17 nnqFlG alcf,./txxivp-,190IL Xv,o1-117J

Nor

la.ig

IS•o-o

).V~

O•2..

Gez-909.31 o,.►9t. ec..rriaclS, u PPE.e. >yr y s• TO- ` u,,,✓r~, ur.,c~~

C-°lo AISS Po 1% pISS Q./NY ~

17.69 18.4(10•SS

18211- 18.a2 PF.e.)Do-rtTL.01kE,CSFX.I~-'rr ft,Jtt.Fzl• I&24 1rsS o•$$ eFtolNIFj.q S49P.P UPPF,.2 CoN7-9r.r 97- 7° 709 • ptFus t.Owke., cm,i7s,c7- 9-T -35°To/'l- .

1-2.% fllss Po ove.y.l. \FEw r,e- raw. 0t02.1.1NE 1zP.9c-7iJP4S p,A,.t.Aotn 1.4 oPJF,,.rTrc•N - lFr•8L Zo.00 I» l$

I- Z% pisS iô .1; II. 61$. C>°'l ovcit-41-fi ) 2+0 • 00 Zl•So I+50 Os 96ove , P4,+M LZ.L7- ?2„36 Zo►JE caF Li dl PL9f* TP.F,r-ab1rlb

`l`i° 7c}. ‘ wEA,- srk3e.. f7î awe._ C.o^rî9ci- • 1.5•0 2,L-.sco 1•w

Lnc1u.4 1-2.1e DsS Po ,pn r n,oe_ CP 7 • e..2-.50 Zti •o o 1-S-0

ZLi.00 Lg* .So I.So Loc,9üA (A.4)6Ps oP Pa a, CiP I~ fjLo~.,6 ~1 o pt ~° `1 ~} i° / ss c ( oio AassU~ ,9-r" Zb pea i9 3.~ r•n S l'e,vvC~ ~ Po Pp, 61"3€c° ?'ca4. ' S, .50 i',fo. 81 I.3i•I

.. FEt...) sscrioni5 fliser,31=7o ,SE PsRJCoTtTF xealloa_a7'r1s wr7}},,,j

26.0 Zk.Sa 9gtgeo . o.,F.Pm . z.1 s°lfl piss Pa , ~•.~ . l'% w55 ci-4 140'14. I-66

5-1010 aS►s, Po ~. I% DISS CP°~.

z-9-0I-- 30.14 PER.Iflurtjf._ orv.I.E. !seeficia71,.,IzrzzA

Z8-.5"0 zg .ay o.$~

LT•per.. Cx..Krf9c s 549R-P f}T 90 d 7t•/3 ► awt. cc,,.., sr}49e.P ,9,— y0°Yc.49

(o+/° o1ss. Po oJo..,~LL Ly~ I-~°~o 41~ c~/• k _ ~ 9~Z7 30-1 i 31.Sa 1.3(3, ~^3 Prf.~tAdTIT dIK~S @/^3 Ê~d•~i' 'o.7~ Il 9Z (u~Lnr~►F.P/IUZ~/

_ ~

DDH #:t1JC9'/-SHEET: 3 OF DIAMOND DRILL LOG

FROM SAMPLE NUMBER

co,JU s ti Zd r.,,. 1.-onh5 g .& z,0

LAC9+~-y Z.P/0 D,SS Po

10-20% p15S M1,,lo2. Cf°y gpl p 7t,E,.10v.J6 5°44 TClj •

1.50 33.00 932,8' '31.so 0,2.o

0.111 f •00 °1330

METRES

Îm) I TO

(m) LENGTH Cu P.)

co (ppm) (g7t1 (g/t)

Ptppbl

pd (Pr

wrt}.,3 71i►s s,EcTlo,.t ivcrMEews PiEe.)Aur,TE ge9raineNrS ooCotL UP To 3v c.,.,.. lunlC:2 fy,.tn wire nIo Pkx-.cS?.Ea

roeSse.o t}o s75 o+sS Po I°lo fllSs

CP`I 1_0G912-9 .,

gb4 33.L3- 33•57 1..1.Ncr.-00•45 or- rz9sst.,C s,,L.~,ce. es-10 oF

wHm} Is Po !eh P~ 510 CP1 .a1Trj ,r'U.-3ae. Mo •

-~,..►a \ 20° ,)c9 •

I0 2.oa/o 4~SS Po ~ M,..1oe. cPy Aton 35•Sv - 3,6.0o ,

LGC9LL`r I-Z% F.a^,,e..a+SS Po

I°% c. &e ..tuss ro ova.",,,,r. k"-.4 CPÿ t~oc,914

0,155 Po 0\1EC41.t. 11Z. CP1 /4/ 1-009644

FE,,,,) 8+.cgs cc >°o w M or 41.0g. qr L{1 ,37 q 54012 = Te,E...11s,016 ZS"' TC9 si-10611-1 in,,Jce,x.1z.r9 ~ p~

Fro4 Pf,e41070-€. M4CWS t o"ÎS g/a HZ- t(3n~~ 1_00,44 et, Pv 1.J ))112Sr•

ea F. at. o.►s.s iPo ovcedfr,.r. ► win) e-00,14-y •

yî.to frz1wYiTE ocrezfira.4 F.Gt. co.spa°~_ twee. 0. 0 r0 %9CX' IrJ etzoiccg"k (jtepNNA Coek-

LowCe- CLr•!7-4Cr efr ^' foS 7c+9

`~- Z--3"/o OtsS Po c4r,.09r,(.

plçç Po 1-0c13N-4 , 9r 1i6.93 STpaa6ge of-- Po Pr, err (oZ°Tcg.

iEVM%PP✓S 1-Sen". Soi-,.0,6(.... SrPJNcf..ext• Co,.1re9in10 \10 M?0`4L4 P° °3,...i6 CP+t w M.,,)°t. re) ,. 11J15 St:c,Po•J IS. Fjt6bilAl G91'R049T1'

0.30

2.48

0,23

0,33

0,2.6

0.31

0.39

0.14 :

0,011

0.06

0,01)

0.007

0,013

0.010

0.010

01010

0.007

0,29

0.49

9325

q3z~

0.413 SS .o1- 33-to

OAS 33.80 o•6o 3L1.o

3L}.y 1•10 0,43

ROCK DESCRPTION, STRUCTURE & MINERALIZATION

391-3I 36•So

933z 313`.00

9333 9,50

143.50 I•So

1-}S,0o 1•50

►lbso I.So

975'0 1.00

14802 I . sro ' 0.40 9335-

Te•LIS`

94.00

s6s-s7

0.47

0.06 ,

aw

042

0•IS

9337

DIAMOND DRILL LOG DDH #:rvlc91-3 SHEET:1j OF G

METRES

(m) (ni) SAMPLE NUMBER

FROM 10 (ni)

LENGTH a,) P.1

Co (ppm)

Ptppt))

Pd (pp ROCK DESCRPTION, STRUCTURE & MINERALIZATION

Z-510 bis5 Po 1 14 I% c tss cPy Gy2g.

y9.60 - 5o.B11 r•ntceo 69gC3e0 •

eita00)►i 0,4 11- t7PPG.,E< C.ch.m)c.1- .)%fjeF l.o‘atk.- Co"rT13c.-1- 9T )15° To9 •

Eeo 11431tu0.4 F,cd9cTup.C5 CG Fru.fd Ar

Sa.S(o-

s-0 . 0t 67- SO TC~ .

50.83 - .5-0 .9 0 GPi9,431c bi KE /33- 117 ° -rca •

(g7t) (g/t)

%.6o o.So H9 ~se

S1.00

5SSb

5b•5a

5I•1 -- Lo P91.. PL96i00..9sE r3c~g5 MaNae..

Po erki Pn .

SI . bv- 5z..1-15 rhtceora9sesea

6e9a3Tro pPfte• r,j,r,rTrc,r 54.1,r,P co,,iry~T /9-r eo° 7c13 •

Nu^'iE¢v05 Cc Flu.f'rJ) ~312L1,.►~ r~c.a-i,e.t;S conr7-9,a A.iG CPy,Po . TeFiJArrlG TG9 qosre/ ~`j 9 Pt+9C~. g~ Ca435P.arc. S.sc.Ti

L ow9u4 e+..e&s gr.►0 w1j rsPs or P0 w a CocaP(,~' OF Po FRIED. F~j,Q1,r,.r~. FR.g~7ue~ 6r- 3~a ~„~ T~.`Mo '•

FF./.4 80.41,s aC aiss • Po 9►443 PI 9T 5°T0-9'.

55;70-' 57.(90 re) t c.ec- c6.Bgeo urtice_ Cosr,5Ug-~9tel-LLc. roe Lciu~.e ea4s'}c-7-- T9T 16-° 7•c6 .

qT

st i.122 3c^, QguA or- Sfrr1 i- M~ RA+E P. w 015P1,941J& T6x?utZ, 9T, Zo° Tcq •

8r S-7~ !oo 69riD aF Po . w CPir t II 7v ''nfe Cu~•►T/~T~

Frw.) <z.r,r•iN &twQs cPN/ 4/- -ra ° T'o9 •

FEW aet£b47'~/j 6+94.65 or 2,.-5 `ro iplsS P, h, M k.►oe CQl.

P►,~.

less' 0.07 0.oa3

1.5-0

140

9

931-{I

0.11 0.006

[1.SS p,o28

.6D 0.032

L?.y ` 0,03S

5b:50 S73N `d•&`~

57.34 58.00 0.66

5$•.00 3q.So 1.So`.

S9.So 60,S0 l•oo

MIr~IOQ ~~ .

o.So

I ►00

D.3o

6o.s'o

61.00

62.oû

64G6

61.00

62.00

63.3o

ro~•sb

66.3'0

DIAMOND DRILL LOG DDH #: N1Gc; /- SHEEY:5OF r"C

SNU

AMPLE FROM (m)

TO (m)

LENGTH METRES

(m)OM ITm ai N co

~i ,) ROCK DESCRPTION, STRUCTURE & MI'ERAUZATION h7t1 a, (1/t)

Ptppb)

60?0- 00.73. 9 69,.ro c1F 3a'° so«ibraes Cao1c c.P./ jocs P 9-1- Ho ° 7c9 • , ,9r 6o.86 g6..ro. ,(19ss! vz 1Py 9,.,i)

5$ ° Tr-8 •

1.-o~e..t-`i I-Z°% c+55 Pb

/9s /9go•/E .

63.30 64.00 rni u2oG6'B.g20

go* uPPa- /9arD Lo ("JF.e. Con1T,9câS TG/) •

611.10-- to4.bo w697*Cter Cc+2E C-l*C PL9Cv IS 6/J oFFwy/7'£-

Ce03-rfN C,U,o2 1F we'T -Yrce-ra.-, . 6ia.vu40, eaedE F2aet

H.-so- 6 4 • ïso 1 S F.~ Soo °.lo ~ECov4,

Z,U°lu a15s Po w ~ ;iac`o 01 5 `- 1 c61.14

Loc9u%) I 7 pISS Po PE(..) Cr. w A449 & Pi URN Fb9c7veR.S ,Sr 15° Ycq .

(p(o , 50 - 611.5o M ► GP..o Caqe$e.o C-aeRDJ371 UPPVe.to,,fra- god Yeg9

15491aP LocNa- up.tj-cr,T r3T 70 0 -)-c,9 . Ly7, roro,cPS 9 ~rn„r~ 6orqb oF Po 4- fr!'i fir e7°1r-i'} •

r3r (aS• 1 n 9

9)' fo2.• Z5

t,wNrr. Pv N CP`( 57Li.‘KoEe. ljJ' `{3 ° SG.~ .

Gretivl Po t of' 4 sTp...rw6rzfC. t p 1 ssEin>^/g7rtb e iser09

RepM (0(0. ,{4- 64.11 PLaro. Pt.00tsra,.. Peonn. fc8-• &'v- 64.0o iy

c•,,gtc F01.1670o(.1 gr 55° co.479oarN(9 a-3 % DijS Po .

feorf\ 69• 8°1- 7o.0e-1 Pti36 Ftoon4D Oot.rf9,NS Z°), piss

FCan -To.7o- 70.90 ÿ % . O~~j Po , piss GP`1 r..) p,~,.torn1, velE4Trt> vs)~ 5P5 /jNtlk, rrF_1dLuNE F69cTuP..ES. 7w° G1F' 71).‘ F(tgCruefi5 -rcg. 11 .0o - 71.2.o !j gat.* de" Zo`90 Pt~S Po i 5-101° 01ss Py/Pn? gr yg° rcg.

11.33-11,5199Frn rle5ssNE (39y.o. OtsPl9y10G c-+rrhvi4Teltxïu ^' So° TGfj eNgrr.31_•1 oPMPos aD o/LF Po 9~ Pn

65.56

0.016 0.34 0.80

0.IZ : 2.26

fo6,50 67.50 I.00

67.5o (o><•s-0 I ,00

(ott93 Po%a~ I'oil

69.5" 70,So 0.96

7041) c9.7o

71.7o

93112

93113

O. So

1.10

l.00

0.26 O.+i8

a2.7 0v13

71; 51)

7~,so

7.5.77

76.7o

7g.00

796-a

80.w

DIAMOND DRILL LOG DDH #:Ntcq J- SHEET:6 OF (P

~ FROM (m)

TO (m)

LENGTH ( Co

m) METRES

(ni) (m) ( FROM TO

n) 00 00

Pt~~ I Pd ROCK DESCRPTK)N, STRUCTURE & MINERALIZATION

IGR,a.N1 iZ-oo - 7Z.)1 6iss Po ,-re 07

PL9e Ft_oo61M. 093" 73 .?b 5n+ 1 613?-ice STJGtAlokL. .90- 6o 'ic.9 Go ,.lT9J.47rJ6a MJrJa~ Po , Py

r, t c,to~.r C6i90,33-1 °r/96 Co,.33-00s\

lo tots Po wc914. FF.&J cot- srti-gakt-s )1 145.

-~s~Lo~ 75,3Z S-io % D►55 Pb ~ Z% oiss cf`,.

76.43 - 14) .61 Iola DItS PY 5-io'/n O tas Po ) s•-lo /o (Ito at /'

5-10 % bIs5 Pa ovee9LL

?8. 85 - 7S.8g al`z/STerll~4 ~tr i c• :4'1. &nBs a~ P~ Po w Te /33- 3o° To,.

gr -79.77 9 ) 5e,••-, cil-c%cc sTt+..l6£P~ Co••tTa . be . Bt-Fg5

or- P-1 ~~ Q Po 91- Z3°?cf

CÿJAr4 i r€, UPra- Zar•JreC - S,j1901 97. ... 53° -r~.

93114 71.70 Q.0)3•

0,01

3s'o

[IN,So.

y3~iS 7S•é7

76.10

7a.o0

1 c) .so

ROCK DESCRPTION, STRUCTURE & MORALIZATION

rrIF.l> I dM Co eta. 0ti9e4a. C~A&Se.o lng,DWe^'1- 09eK, &t"?.Ÿ./-4 come-- Mv7Y~JS OFiGWt/ lTE L~t~'e. To. Pl.l9r~wct.~s~ . coMPvsii'!r~ ; e.0-7o% iP~ie~.~GF✓rléf ~3o-~io "/o Pl~9Gi oUocr~ 01-r6e171 o,l . 1"-PC/9- rno(Y,,PATE.1.1 L`+9eBdr+'9YI zza i_oCr9Lq

,9 MA) iebol-tTI ZFA • (..)o~Lq ~iG,,.i~3'i~ ovF~P/~u.- ~ 1-0C9 144 sTeo../GL-/ rt79aVi5Tf G rrvnlF,,p91_1741100-3 : `rlaef sS iocgu-1 F@oyn I% To sf./ry1

- i rr~g5s! v6. Svc-Pl1 i~ S ocev2 9S P~+M9,ey "'n14-4J~l~ ..

es S7runIoge-S w4-EtS e.Ilp178:luTii'.6 •~ E PR.+nJccPITC. S.vr:Pdcn,ES bec.Gfi9st46 oF /9g✓i,/c/54lce P`Ir~-+j1orlre I C.Fj9~cnP4rP.irE ~ P~v.~Tc9~lA1 T~ ` ~YP.~7~ ,rnt~~/. r-,iv cto0,96RP.o I:>: TyE. Tcem, 1.)5.6Q 78-E Ir/ne 0e9"/01 VEZ-% lo.•,l aF TI-J6

f;ieovcE Mr,,n1~ ► avC Uri "r;

C,95I,4,v MImk?e M9lAvi rTÆ

Zo/p`cats Po oveym., 401-All 9 F-/nE4 Ge. G9ilteo

5300- &I)Z 8 r9ti,clui-7ssrqqFl~ x,6.,loLrr#.

7, 6q-• q.tiA s-- t o`go OtSS Po A ve.,e91,L ,95 r3se,v6

,gs sgovE.

(pm) . C.) (g7t)

G

Ptppb)

METRES FROM TO (m) (m)

SAMPLE NUMBER

FROM (m)

•~ 010 . 0,23.

1,So 0.1f(0 Vr2Li Or3i 0►D I

1'00 0r23 < 10 /La

1.5° ~ 0 '20 10 (7

lo .5o

IZ.00

93L4(~ .0

4s Gt4

llIMJlGCA R1ESÛ Z' INCEZ LTD. NIC-91-4

DIAMOND DRILL LOG ' OEOIFQ6T ~ Û~

AREA: Nlico L8+cL CONTRACTOR: FoRe&E SE s7"

CORE SIZE: gQ. CLAIM #: 15123zS PROJECT: o llco61 J- ta, DATE STARTED: es/0,4 / 91 DATE COMPLETED: n/0411

LAT: DEP: ELEVATION: DDH #: BEARING: I Frv °ez TOTAL LENGTH: 6s&-r-q 51q•y- n

LOGGED BY: G.1-AN G

SHEET: l OF 3 INCLINATION AT COLLAR: -145 7

SCALE:

DIP TESTS

30 r^ ► ° f~ 55-3',-) Y3•5°

DDH #:NIcgJ — DIAMOND DRILL LOG

SHEET: z OF

METRES OM TO ROCK DESCRPTION, STRUCTURE & MINERALIZATION (

SAMPLE FROM (m)

TO (m1

LENGTH (m)

Cu (%D

N ria

Co (oan) (~t;

Au (g/t1

Pt (ppb)

Pd ! (pob)

~

~ '

Pt9G Ft.vc»Ep r Ia.. 50°10 0P gosl- I5 oF C. Pi-,96 • 1 Z-5% OISS Po O vF.e9~!-•

59Me- a30.1[î ` C.-.2 Tc. CPI Locet.I4 .

55 (360JE. ..

4 113 0►ss Po dvE.e.09u.

~- icy. 6i55 Po L.,0c914

abcte.C. la-e/a ass Po w L--s-% a ►sS Cai .

Z s.dh Dlss Po l ar.tru-y cm. OP") 3.13c914.1 , r9 C°4-M4 GP tjeieu,.1 E

10..15% D1s5 Pa izS s=10% DISE (py aviCe94.1... ,

PPorn 22,.50 -• 2z. 70 /iS a&oJ~(L i peat." tL•70 - Z3.00 1-2.d/0 c •Gt. P0 OvF.P9l.(.

1-z°10 biss Pb dVa9a.l.

I-00 DIsS Po ov6.P,9LL 1 91- Z3, go f3; I can Gcr-dCC .S3é,,,,t42, Co►.r19r►.,UN6 B>t&S aF Po d- Q,11.--/ ‘ AiT Si ° Yc,9 •

4 I% oiss Po J-00.34.

13 5 9504F

/97* Zg.30 gSirvn Ob+.f'e. sre,.~,F,I+ 9-; No°To L I°iaf11S5{;P Us 405-1 g4•19~T 7o Bo i ri 51~f5 dF *C. Sï~i..l6,£k ,

ei5-c0- 3'i.l1 r,,ctoosaeo

Ù~~ 4FQ~7uGF6

a, slo C>rss Po I•5 I-e0 c.ISS. GP/ 0•1.ve/1•4_. .

FLIfA 1z, Pi iPo /57-g 9.1D 33 0T~ •

cl350

935I

93$7--

9353

9s-Li

9355.

93s-e.

°3~7

g3$3

95-ti

9(vo

136,1

93&a, ~.do

~36~

936~

IZ.00

13.0o

14. St)

16.ao

I7.so

IEr.So

Lv•co

al .0o

22•W

22.5o

V3,00

2350

24,00

mat.'

33,64;

3~(. (°I ,

13.00

It).So

1(0.00

(7. So

le.so

20.00

thew

tz.do

?.Z.SO

Z3.o0

Z3•50

Lilco

ZS.Oo

z.G.Bi

28.So

3aj; iy `

3~.aw

1.00

I.So

I•so

.I •5**0

1.00

1•50

I• oo 1.00 doUL

C?.S'a

o.so

d.$o

O.Sb

- 1.00

I.oa

o.~v

0,so

0,FsI

o,2({

0/lb

()al

0r20

0,12

0466

L'► ,ZZ

(1 9()

O,dp

0.01g

0.661 '(i.

OiJ l

0103%

O~ObZ

.`

emb

G,dsS

o►.3S

0,23

pr ig

(1r0~•Î

0,a, 0 r32

OM

0113

i:aI

l Û

0,215

0,11

Û,(~~

Q~349

3r0"

0'0(t 0,009S

o► c06

6O0b

(1►Ol b

0o0(7

01084,4

0,005

atoll

0,01

0~(k1~%.

QrOIv

629Df}T,Gr1/jl. UPPo.. cot.rrztGT SIi9a,P >~,,.:F.,e C.ur.,rr,9or 9r ifl °-rOq. o/

,~ / l.o l.J~ CoN r-9G3" 15 r~,~•.J.EP9i.i7. ~ h> S- I O'J ~fr i~+~C~C7 4%l,(J~ Pp •

~ °

2-'5d 6/0 e~~- Po w 1 /a oiss cp./ l..orq-~•~~ ÿ°sr,Cc,~& ti ~ c. at. P.~&. i~)c.J ~eo . ~

CC 5T24,46f-e jWtitT it,ici3 Ae.erh ~ ^-• 36so - 37.7p ,

DPI-3 #:Nicgl,. ,

- DIAMOND DRILL LOG

SHEET:3 OF

SANPLE, FROM tm)

m (m) .

LENGTH (m)

a, P/.)

N Ph)

Co (ppm) l

Au (g/t)

Pt (ppb)

Pd trm METRES

FROM (m)

TO (m)

ROCK DESCRIPTION, STRUCTURE & Pv91\ERALiLATION f~RNBER

Q.. $7.GZ

,..

Peorv1 3743- 37-is 9 erAA1rE DtKË ,a.r 5L° 'Too.

F-eo„^ Is.67-3ts.r7 9 Goq>Tt. b11cE /jl" 75°7C9

43.00- 147 1Lo rill CPot'o9$g2o

9365'

9366

q~~t o ~•7o

`j 3foV

936~

97 ~~.50

3e1.7a

yL.o0

113.5o

q6-100

'1640

53."

Sti•$

io.8ÿ

yt.60

y~.00

qb,0-

ifbS:7

~Q.00

91.Sro

55°D

5746

I•15

0.60

~

1.50

i•oo

O,SY1

I. 30

0.70

0.5o

t. éZ

0,13

ow .

O,ZI

065

o:13

%elJ

n 0.0%

0M-

0,11

0,2s•~

0(94

01iZ6

OiZg

vi~

041

0,0as

O,ppb

, Ù 0 6~

000,j

51•9

0100iio

Gre.4oi9Tio,VgL u PPFR. CO 0474 cT' Il 1.awQt 1 t

Ville. ' c.oWL4 Z-S/Vo v. F. ee . ass Po ra -3* rnicr.o1111S,e,o

5 Su0314 C09etsCZ eP..s9,,.1e4 soorlo.J • FIT `iZ•Zo 9 3eryry. Sii?i..16ïe.. oK CP•4 4- Po ‘ eft-o,ago 140'6' 7'F,,4S; or- ► Gi9SISS FA-I,t•cD Co"a CPq a-Po 1

7EENps 3o° -ma- 41:0118710..6

1I11 FR,a~*1 1{~• ~ ' ~~f ~ 9 Cca9P~S!"c raOg~N 11~ ~k,cr o,~1 ~ 7P.Er.tD►,., ~o"

10- I$ ° 7'c-", • C,d,.1713,,.1 n.16 7"e Po . 1 -* 4°.ST Qa.1113,1..fS .4.1%

F. GE., O1sS, Pe LC Ci9114 . _

11S'+61- 46,a0 9 Ina) IL,Wl roelfi,.1Q1 SEGno„! r,.,o4ryialn16 9367 ~-'lo°k 0155 Po ,. 2 S~~IO~~o DISS CP~I CSQEiJQ1..lG So8/~1Gh1.

1-004 ~ 140 4. F. Ge.- QaSS Po •

-5"10%S P© n9 Ld%a 4155 `~/~ FP~~ ~g .BO -~-19 ,00 ~~.`/ ~ 01S I ► 1

thIss to F,eaen uq.00 - -SO.Ol)

gr 51-.39 q oarz s7ea,.16f,e- ~ 5'r,ri ~ q~- 1}7° y~ •

Ar 54.0t0 4 i cn+n go.1m vF 'nlsS Pb w P., -ritrc,4a1Nty 361' Ice.

~ ~ ~ ~~,&t~— S~.Z:3 !~a aF o!S5 !'o d- CPÿ 9r 3s °Tc~ FQ.oM 56. 69- st -75 ,^-10% 4rss Po w I-a% 01Z CAN 1 \ a~~,,~b ,~,tr r~ 7v~ ~ es '9gcF ~,~n s7.3ei- s7.~,Z,'â F} S.r.r, s~l,p~ ~~ s~~/7el.

Gegistrt~

5iMP toPi.e. co;.rT9or- 9f SS° TGg.

NI1UNOl.RCA RE S~ÛÛIrwEs c7ra NIC-91-5

DIAMOND DRILL LOG GEoEFaC T .

AREA: uj CONTRACTOR: PoRd90E

CORE SIZE: 8a• CLAIM #: 3So3z5z PROJECT: pl I Ca&I :-OWL DATE STARTED: 2q/0'1/11 DATE COMPLETED: a /oy /9 )

LAT: 16 r.--) r.iotTFj DEP: 33t7o E ELEVATION: DDH #: t ic. I-S" BEARING: ► so °i z. TOTAL LENGTH: LOGGED BY: G. LONG

SHEET: I OF 5-INCLINATION AT COLLAR_: —66°

SCALE:

DIP TESTS

tg 30 r4" 6L' 6qr+--) 62,®

(4'

FROM (m)

METRES TO (m)

ROCK DESCZPTION, STRUCTURE & NiINERALIZATION SANppLE Nl1<vBER

FROM (m)

TO Irn)

LENGTH (m)

Cu (%)

N (3/4,)

Co (ppm)

gg (g/t)

Au On)

Pt (ppb)

Pd (PPt

I]

_

68. 6o u 4I — --l3_• ••• 1.'i A. .i ". •_~

gZ94 4 4a c rio I'....

1- 0,- a9e,ic 6e.~•.l Co~.c~ r+r7vTjlf„c. o,c,ct,a ire avE To pi.,901 oc4.6SF • e c CoMPosi rio.J~ bn-To h~`IP.rnc~E

iii.v146

l 3o-4o ~o P4096.100-9.56/9c,rF,(✓9r~o.J -% w~1c- ~~l c~~o.rc9T1z,Fi~ y 1•.ace(.L1

arylP1 f 13Gi_ ►T I LŸJ

t.~1~Ef~L'L`f /h9~o~iYIC, ovk.e,1~ 1 1,r~C/3+L`/ sT~Co.Jr~t~ M90.JeT'iG

mi,sEedgt-IT/-,310. • \/912.I,. Loc91.4 P,eoM I "lo Ta 5Frol rlar,Ave,

sui-frj1aE5 dcr-!/e- 05- Pe.l^'Vity `n)ET rFxrv,P.E i 13-N.15 $s STe-r,..) oce-s fr,,i}Ee eerrwg j L1 T.Fé~ . 74E PRa,QGP4E S✓LPi} ass

late 1 IrJ ('s~r.Gl:xg S I-JG aeak'A- cg- A80.JD09,•IGE i plepAdri- irE ,c4*i.coHerr.6 ~ ~In~lart , Pl,I;Ir~ , rrdl.~.

ri11 cP.o G*Bôex )s ~ Io.. -Tistrr\ us rr.D Pix. T3}E (rliNIC 6b9/..Jr VeeS.or./ coC ~f

19r3dvE rnP..dJrl o^IelS c1/.111-...

COS/r46

t- 11. 10, Pi4Glow3se ‘‘FLw~o sIIo.. '...4 s‘fa-70-J• -IV Is sEa-la..[ Cor.T9rA dEe'1 c,o9ege 'GPhIrJE!) P19roI oGtegSF , ,95 wEtL 9S ouViktf- 05.,4-411 Pli2v,GGJe~ wm} ~.urjvujlE 7~TuPj.r

< I al*atsS Po 1.0c1)1.(.1, fir T•I& 9 3-S'nvi'l Po,Rl s-rehlr,F>

DDH #: A./ I/- DIAMOND DRILL LOG

SHEET: Z OF

METRES FROM

) (rtO

) ROCK DESCRIPTION, STRUCTURE & MINERALIZATION SAMPLE

NIA~EiER FROM (m)

70 M)

LENGTH (m)

Cu P/.)

N P/.1

Co (ppm) [ t)

Au (g/fl

Pt (ppb)

Pd (pp

.

a II•/$- 13•1-1,1 PfzuXtTITE. (SEk:P64ri"t1ZE1>>

940O

.:

9401

"Hot

I

9~jo3

134- )

15.37

1740

a0•36

L3.ZFs

I, ' ~le~~.

Ltà.00

2.7.S'o

29.00

30.00

31.00

31,So

33.0o

311.5d

3~,s0

i4•78

I6►LdZ.

tg.lz,

2.1.56

zti,sa

e.°O~

Z7-SO

402

go .o0

31.0o

a1.5-0

33,ob

34s0

35-.5-o

3o.00 a•$b

I.3`~

I•os'

o•Tz

I.tv

I- az_

1.5o

I SO

) 0 00

1.00

o.

f,5o

I1Sv

I,00

So

o.2S

0.27

~•24

0.24.

0,22

0.49

MO

0,30.:

~ 1.5-e)

.

0601

0.014

0.01s

,

0412

.

vPPfR. CA".172,ct 5492P 93-- 57° Tc9 LowEe_ co,47/3GT st}qeP or (Ql ° 7C9 •

L 1% v.F. Cd'_ . b1sS Pc) o vF.e81-1-

I, I:113- IS.sS PE4a8oT13'G CSEPPra-r1,rS1t Fn~ OPPF„F✓ Con1TX;r slj+9er 9T tiL° TO9 • Lowee- co~~ 9G► si3,52P 9T tis- °TCfj

Z-5°!o F.Ge.asS Po % r1iwo2. cPy IT I4•22.9 5•r..4 41- $o°Tto.

596-flf... 69S 93"Ve.

4, 1010 ss t Po o

I F.Ge. dt55 Po 6.7- -L° 10 ovt.01-1- 2A.IZ 9 2,Mfn !'a ,57-t'l►•jfoC,4... Ar s`5° 7O

TiZ°f° F.Ge. D(S$ Po oVEl9LL . . . . . .. . . .

Fear" Z6- lb Zs- a Wx4r-- S469e- 9f 6o°-roe `~osr Co.JT9+~5 )-Z°lo p. 6e.. ocss Po .

•1:: I- 2 °!o ISMS 6 CTe- pq \Te. CP~

z-9 3o- 61.70 5-!o% F.GG.DtSS Po i-e.cp~ .

Z-s°Jo F.Coe. 01SS Po :

/3T ' 3) .1 1.1 9~sog ll TO,.•5 - I cr+\ Po , Pr-, sre.t~ b~e • nPl~9 Coi~s UP TO i0°% P. Fie•tlt55 6'o .

4.... Iola Roe. piss Po 17:0 -r2. t`_Py

HS 9govE 13'0 t^ocrgtl.q•

A)5 930•15-

9r 3517 9 ion, (igirca OF CA i oviPju.* ilosT Coe.,;9iJs zVI. F.6e.Nss Ao

cHog

91-105

9~106

37. o0

3g.00

$q.00

q0.00

`il.00

LIz.Oo

ass

0.38

0,22

0.74

0159

O,y{

o.76

1.00

1. 00

1.00

1.00

1.00

I .o0

o •6t7

O.7Z

1.40

9,111

9L117..

°lL! IS-

9416

9 4417

cj`i I& :

45".ao 4.00 1:00

1-16 1.00 y7:o0

DIAMOND DRILL LOG TO (m1

LENGTH a1 N t%)

Co (ppm) ROCK DESCRPTON, STRUCTURE & MhERALIZATION

FROM NUMBER (m1

j z,°lo P. eQ.y..>J Po W 1.• ~ oVa71.- ‘ Ifr3i0 •,-10 19 SOW) STea46Ee.

oF m95S1•JE. Po >c.fq T n 9r 15 ° -rc9 Sv2evv^Jt.F13

F.oP.17155 CP~ 0r40 Ml.-bt- (AM IS PS oF Cpy .

Z'10 F Dis5 CP~- 9s /9govE

2-53/0 F-•M.t,e. DI5S P. oJf.klyl.C_ No 7

~a 10.10 qI c.-.t~ STe i,J(~~F2 ctF- Mg55, %/E.; Po C~%~ Pr,ao°~J~r O s 61 7~ •• ,+9►' 140,6g 9 3nr,r~ sTp.i^16t-a~ Po~Bo-9o°/®~ P~t!io-2aâ 9~

,9 - So° r~t -rife )IosS C0••rr9,.%)S 2°/0 4155 Pb ovEe.F7Lt...

9r ~ weeK: s*E9e G I' n9 • I ÿoSr Cu•tr:>ws 4.: 1% txss Po

~-lo% F.Cue. piss Po oJFt.91.L

9LI so 42.60- Nick.

16.00

37.00

33-.00

3î ,0 g

,00

Ito()

ya.o o *.bo

0,023

0.016

0,008

t?.016

0.019

0,011

0.019

0.9B

0.2S

0.15"

0.19

0.19

0.36

0.13

0.25

0.Sé

0.09

0.17

0.12

uPPi1✓ CrJnti'~gGT s>j9ep9r 370 Tc,9. owEe. co-cr3c.r sl}9e,P 9i Tc9.

/i', 43 sre)a6-4:2_ vF Po 1 Pn ,~ 55- ° Tc1j.

91-60- 44.10 5-I0%o p1ss Po ,13'r NLf.~o 9 Cd479cror^' lo°Tc,g 81,-1 74-L uPPO2 . Cael91,.I ka G9-4seo i9.da fj 'r11 cea608t1;eo

w ~ GR/jD j;1o.4gL. Cp^rAjc.,f ,,,fro 6 iv.r,.p . Ge. G9's&P~ Lis- og,,., . G I °Jo F. Coe- Dis5 Po.

Lot.qta{ Z°lo OIss Po .

.95 960vif. 1/4 97 C• et. PL9G. 5Ecr►o,./ Së6+,x• 'Tk.fi,,a IS .,.., yo -504' T'cfJ wow- irY9; aJ P4k5+1:.47-- w sN,„)c. rt~1D. Pu~ •rLUobM w?~°Jo 0155 Pc

11%•Sij q cwsrga Or- e9No0•.iq CJ21rr.N1'i,EU M95SNE sr2o.16ge,5 oF Pb ®r, pq . 9 E.G; I d..! 49s '9+-1 oJee,u, -reeNe vr - 60- 650 i-c,,

ti9.1 Mmeo06mo (gMP►~13our, Fn~ r~bp. s,~F,qR,FA 9r 6o° Tc9 • vPPet rn.tqr.t sF111e.P .g► 4S° Tofl - 4owEa. srontricycr 34 29e-11 orSq° -Te c9 - 0v02 ï1-L- 01<c Pc -

142.k8 113.6o

y3.6o - yS.pO

97.00

'll-,00 'la 4-o yI:sb yg:oo

4%ao 1.00

o.so o.5o

0.0Y

0.429

1.00

a07

0.1Z 0.441

0.76

0.012

0.022

0.006

040.

0.011.

0.017

0.049

0.001

0_.23

0.24 2.09

0.07

METRES (m) Ord

`19.00 50.10 1. Io

DIAMOND DRILL LOG DDH #:

OF t

FROM (m)

TO (m)

METRES FROM ROCK DESCRIPTION, STRUCTURE & fv~ERAUZATION M~~ ER '

(m) TO (m)

LENGTH to

Cu ('/.)

N (%)

Co (uPm) ( t)

Au t9/t)

Pt (ppb)

F'd lo

...422/0 Doss ~a Loc9u.~ ` Few GL'-z/ r,c srea~IfaEeS Cl-z"-in,. ...422/0

•~ ~y 10-14e7c./9 • s 98ovE taut t!. z-S ~~ 9~{z•o 9 4~~ ~ ° ois Po .

t.ocq144 I- 2.°/o dtss IPO FFm.7 491eu•.ie. F~c3veirs 97-- -SZ°7rA. Ftl.lka w Po> GPy•

53•10 - 60:0o Mic,eo&9s3~e .

9 /1

9 al z 1

; Ï

50.10

51.00

SZ.So

~;

..-._ ~_,.

51 •oo

:5~•5o

33.10

. + . ~-1-S.24

~ m. ~ ~

.. ^....._.

Q,t ,

n , la

I •~o

o. 6o

~

m .

:~

-rn -cry

---~' _ "

0.03

0.o7

0.08

~

0,09

0•1 `f

0.16

0.003

b.OQs-

0-or'J6

, ,. ~

si}.gieP uP,°~f,e. Cp,.>Tacr , 1S0 Tc.9 . SOL? cAwrce c,°..rr9cr, Zl ° 7c} .

-15. SEr-710,4 C01,3391nJS auMq&R)s 416MNANS CiA- PL1}OIGCL95C E-7,,-.2 u°1-° L}o % 9etcui-oP- Ge-sisT5L.,S ac• a1..MnfE J,J SvSPF .is!°,J. l.ocq; ,fl,.g Or.,b -rAX.•✓os 9S Fot,.wws ;

53.51- 53407 t)PProc, ao,.,--, c-r w. c s46e.P .9r Cv I ° TC9 . . 14 wFX- Con17-90r CL. C.S S ►}g,cP /9)" 6S° TGP

33.77-5S.go U. c.-. s4•92P gT' 5o°709 . 1..C. sif9ep >jr Hs-° Tclj •

51.0i -5`1,41-1 V•C. s440-P 9r 70° ?c9• i_.c. et96911•CL TO V. G.

571$7- 51 .q$ O.C. sij9?A Ayr 15'Ta9 • L.G. set1'PP or 33p 70. 1Gv,.sr9b-ls. (%a its pc, LacJ,l1L`}.

9r 55.ip 9 Ifni," FicoC.Tve.E Sug4-jr..9 --' I i~ P~/

t~~ g„~ Cr 60 °7i19 • ST. K.- S-6. ~ =d9 11.Ç _ ekl•"J,. :'°„ ~~ L..C. " , t I. 7s° 7z9 ,

56.)5--s6.3s el.c. st~9eP° 9r 3~{°. TO~

Lc- S4.9CP 9f ll ° loi. 1 /Yt'S10.33 6 5r191 [- 1.4 Irrlryk Ffijlc7v~P.E.Jr Si°7ct9 \ otsPt~c.F6 T~ ~& zo~.

37~Z`l- fa- 1•~16 ~L~n~u.~ s~}?et'' u.c. .9T 30° T-~

:..

~~ .~ L.c• ,- 9 ~k3° 7-c.97-c.9 .

57.9 5.-- 5â. 19 U. C . 349e12' 97 Z2.° Tra9 • )-• C• Si-1•9eP ' qr rv5°Tc0 .

$7 $`I.6LI g I c...-Y» 6/?4 , 41-7E- iL'r•.ibge- -L T09-

DIAMOND DRILL LOG DDH #:n)►cy~-

FROM (m)

METRES TO (m)

ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLESAMPLE FROM (m)

10 (m)

LENGTH (m)

Cu (%)

N (%)

Co (ppm)

q~ (g/()

Au (g/t)

Pt (ppb)

l'~ hpc

Sc1.8I - 59 •tL 0 894.0 oF nlsS Pi , cP4 6; 55'Tc;,9.

i_ocPlu-'i z°to r,►ss Pi fo. `1Li22, 62•5n 63 So lrov 0.84 0.06a003

59^1E 9s 9gaJe 9,1z3 Gs•so 6ii35- O.sS 0.09 0.26 0.007 0.1.35- %8.6o rn t c,eobeggen (b9eéc 6tF6.4 '-914-11o0-(3ocrC. t-ociyiZ o.e. stf•OePr /T ° It* •

1... c . s69.2P Or 1c1 ° TO •

(o(o.00 - (do.13 fi CouPtÆ or . trw\ 5u144315,E PIUrcA ge9aTuICs 9+-1?J4 (06.00 (a6•50 o. So 021 0.1•r D•OIy

T4P'e.442.J1‘16 !►Ôi 5e TO- - (psi ). ePy, • rem') i' . io - 66 .1'0 1-0,91-I-4 TiVo AISS Pi , Po Te Cdol

Fto,n 6t. Lib- Eg-•(Do 6 gÿJD °F- 10-I5°%Dt8S Po 1PI 1.1- 41070 (1/70/7o ~.,i7~E ConT1-jG7 963- bS. i b 4 SM~ 1 I ~►~n , (4174

err-AY-710'J -'t,r( OP-- rf19Q.61t0 1 If To 7r16 Ge,9,-IcTF Corrfi9c-T

112-5 112-5 (A.10 63-.17o ~•Sv O.I~ 0.35 0.01

.60 69.5 ~{ 68.60 — Or S1-1 1-1 (ÿa6 6e9J7-6 - sw6lin_-) Poepr}yesic - t✓01.19TFlI 9f 600 3° . FevM Cdi.00„n- Aow/J 11: ,7co - v•c. s1}eep ,97- 441. 769'

I 2 go(ES OF C6reg. SToPl~ ii.t eat/ )1,J - nlae,,,Nl49 cLe.

I -

_

l

, _ i

~ Iii illll0l (0/44.-;/,a l liL6& 61V ~R1.1)~1~ ~V LL ll U. I

DIAMOND DRILL LOG

NIC-91-6

GECFA6T

AREA: NI'tag, ,A, IcE

CONTRACTOR: Fob%,€ ctr CORE SIZE: Ba CLAIM #: 3son_st PROJECT: Nitcogi I.,9tc-6 DATE STARTED: Z'J/o' /q I DATE COMPLETED: v4/0.4/91

LAT: IC* rnermS mot-T/1 DEP: Il+t.o t ELEVATION: DDH #: !NI lc9 I- (o BEARING: !Bo a /9z. TOTAL LENGTH: LOGGED BY: G. LorJG

SHEET: I OF (p INCLINATION AT COLLAR: —3o°

SCALE:

DIP TESTS

• 30.5ri yS• 5 ° • 07„n yy °

o o

-.

FROM (m)

E. 1

i~~- 1

~SAMPLE ROCK t7ESGR~TION, STRUCTURE & MINERALIZATIONNIII`IER~i IZATiON .. .. j..~, I~AvIBER

FROM (m)

TO (m)

LENGTH (m)

Cu (°/~

Ri ( %)

Co (Ppm) ..

I~ ( 4.)

Au (g/()

Pt Wu)

Pd loot)

16• W ks

0.6o

: O

-'tu„.4: , rafle4E- tti 4 7s_Sàe9Bata2 '

9~?=6

)

It. I~•oo I. i~ U,12 U'la 0~

,s

. ,,~S

relFz 4.)r3a, `~,-e.P...f."1 Cot.De i rnoTTCa oFFwtiiTE ove..-ro Pt.ni.,: ioctgsF . Co~po31rtonl : (oo-70 "~o PÿP.AtEnlE/ot_tdWE 1 3o-LJo °Io PII)G • qt-TfeAff►o•.l : w:~,9K- MonDUKELY G9P13o,o4Tetteb o 1_0044_1

RMhI~)~oLI TI?JFI,g SetAF t~J stTi~,ID •

Ov~T9e-i- w694c4 .^e-v9e"iETtc \ 1.o00)24.1 STiea^X74 Mi36r`IET~G

rr)1Pfe-et-I -ti97'io,.l : \fi9~.t~i5 W G9t.14 peorn 4-- )(Vo 4 ISSrc/n /Alr,c.t.

l'o SQlnl-• MOSS' JE -ro MgSstve, sui.PdiaES Oc.cvO 8S

P2tMee}l ` NiET -TFac.7ruAe i9',,ta RiS s7 AUr.500:6 wdFJP.E ~ (~?creb/3 i LI?.FJS . r'iE. Pt'ü,.tctP19L S✓c.Pr4)A+~S /9e.6~ Inl tece~F.~9s►,SG oe4~ oP 9u~~ ~c.E ; plpvio7'tTL Cti9lzoHe.ng. ~ PŸr1JTi+9n/l~) re~ Pl~P,~i~ t MoL~.

rel

O

— Ls 714.E 7isPJYN usR:b. roe. e Fir 6/1:7'r...IEp VE(>Stra..1 oG

TEfE - 860vE ,r)rt.,Thlnfe.A Ve+l i r•

L'gsttq & • — 7• qo MtezoGHRLjPo

Ve?-q t>?t,'p9TIo,.19L VPfr,,e_ Cd..rToc.:r t Lot,Jl~ GcsKT9cT s►}9tP gr 3ci° 7r4.

i L~~o OISS Po w MINlGt- CP7

1.00 0.1.5- 1.00 04

1.00 0A

041 0,11 0 ,1'7

0,03 ,7

19/0074-

'oil

0455

0,011

(JrOII

o, 069

003E

DIAMOND DRILL LOG DDH #: ►vlc9 J-i

SHEET: Z OF ~

SANPLE l'd ttxa METRES

FRAM (m)

(TO m) FRO

(nitL~ENaTNI Cu pa Co Au

( tl Ig/tl Pt

ROCK DESCRPTION, STRUCTURE & MiERALIZAT(ON

O,Oca;i

0C(e cj 0u7

o,013

5ornE /35 erro./E

59rnE 9s 986V1=

,, ~ ~ ► 9T I?•SD Fé.rx3~~

CP`I Po w -re. l'60

17•bi - 18.gy rntceoG9Ci8eo

C5-10,nrn, e.t.eg5 oF

gyL7 I~•oo

9'♦Z& 15.00

9`ia9 I6•00

91-13o 17•00

15.oe IC0 •00

17.00

17-69

/00b oil'

0,16

0143

2.€0

09$

0,39

0'33

/4D

u.C. 54ee,P9r 0° TO' 1_• C. S1i9eP 9Y iIa°YU3.

-1.0clu-y$a°Vo n tss Po

g1,sl IcP..3o- •'C0 F.t3t? ..t)ss Po.

L-5°lo otss Po a Me,.,oL cP1 /0- Lo•66 q SMM Po tePllt+r9p& STIu~t- 97- 53° Tc9 . OT a). 49 9 zn..•, Po 6~a.1n gT 70°n* .

FtvMqaI. 67 ' Z3.0b ~}ur~o5ï sEr~ t - ~çnaE o.s~ : -r►}E E,.rinP,E

;JI6,,~ r.,T • PiUMh9e4 TEATuP,,e. 13 Fx/tac"17' - SUg,9•460144.. o~-I~I•~. )Us~ ,9PPoge- To Fl..o9i 1•.1 .g fv1,97P-1)(. ctF SO-P>Iloe5 W41c4 Cp/YIPOS,E6 O1c iX190-114 o W ^' ZS'i° or` To-ML 5ut.41ilo.ES 13E1 , 16 Pn . ovEzifi4.-TièF,4) cyC -nits Ta.)E Is +16°709,

oveem-t_ 10-20% fntFb- c•Gt.ptsS eQo tell/ Ce,r$ü.>EQ,. LI.3`1-e3.410 )s t:h.41 ctv sErrn-m95,S,vL Pe ? CPy> Po► cT1'Emn1,aG ~ egQ7cA.

as--3 3 5-1o°Io M-C.Gt.t)IsS Po , 9r agit" Po sr '9t" W17 TG9 5-Be g seePW,Tl•4tzr,s PEeJNYTJTE xla.latrn1 r L8'•61- ZT• 63 6' P1 ,Po 9r 7o° Tuâ- LS•'71' ~•76 9' sC~.PF•aTi.~raF.a PEet1~TITF KFi~oi-ert, ~ 9~ uJ9sTF-eF›

k~ / A t~.~ s'~~il) piss Po (..A M INipe_ 01, o`,JEz9y

ac cx;=4E:5'Q 1-Z"%otaits Po ) Z5.1?'L-voioo i-L"/ajAiSs Po

~►.~ - ~,.17 ~ at.1Æ PoC1•sd°~6, Pr, Czo%,

~ , *sr .1.7'0, . ~12637-43?, ~~ m95Si.1E 8,91.111 or Po I Pr,11.. "MI. 9r 7.f0•417 4 5",.,m sTP-INGEe.. OP Pa tp" qT 3g°Tt9 • TIA I;oST c°^m91N'S 5-'1012 c.Ge. oisS Po w e.P1 (- To 10!° GP -7S Te7"9A 10- ZSale r")- C. &a. piss Po, eq. Tk. Pp Cu4719+)%5 a/9e4,.,6

F}rnouM'S oF Pr"

1) 1147 I. IS O.

9,131f

`1433 IS•841 zo.1.S

ze•3s a1.67

Z1•67 I Z3.00

9,1353.00 a i.00

G`i 9-1% .0o 26-.

943/ Lsloo tb•oo I.00

91-138 26•0o Z7•oo 1•o0

I•oo I0'113

1.00 I O r1-10

27•oo .cn' I 1.00 0;70.

i;9.00 1.00 . b,iq

91-î3Z

2,2U 0,091

1, 0‘ a,o a

r..~.1•41Enk

DIAMOND DRILL LOG DOH #:f•Icgl" SHEET:3 OF (P

METRES FROM

~ / ROCK DESCRPTION, STRUCTURE & MNERAUZATON ,m

( 9.39 - Z4So ^- w% 01s5 Pb w Pei,J pr19ST,vlC sEc,Tidvs w so

SAMPLE FRmr N

LENGTH t9%1

N/1 I1‘,....,„,„o

.l rot, A/u

t) '

b► Pndn

ago P~F,~A a,eaEnlT'~9TterJ or 6o-65'DTcsj . ~.So-~t.gb Io-15% Aee. d.Is-S P° .

rtv 330.s-0- 3o. q$ lo'/o F Gt:.61S.S r~ 11.t.'%440 3I •z~~ tel F4s~ci`vwL6.S `1"i2E+.t4r.~(o I5' Ifr.1p 31 °7ri) essrecr,v

Lo - ZS % C,CryC•• I,)ss Po 94p is 0 c • foe_ wt,9G .,E✓tc...4 t~~.w2t7LP7:~ T .7-,t esn r...01-JE. e5 Igo0s etrr ,â 10-1511, ass stx.PriloiSS

RAM a4,05-- 3ti,53 9 Ssent -mar,slvt€ took, aF Po \ Pr, tu T~CrcJea .

flr 35•I7 9 crrn Po tP•. sTvJ6m. a.Tca ~Peorv13S. I7- 35 ,(„ 1s.-- o°/a F.Coe. z155 Po \ w 772.CP1 .

35.7o - LIo,7S nnlr.e,o&9662o iv, F.6G4►sf1:s.- 0.3eK F~~00k ~ ~

18-142.1 ~

Q14y3

9'I1-I4

pHs-pHs-

9~I N 6 35.

9 41- j7

qygg.

9+11

,! ~j•1~~

9~ ~ l

cfqsZ

945-3

9~5~

Lg,00

30.00

31,50

33.00

3+~.00

uo

Is--70

37.00

3$.a

.. ~. ~" /~

yo.ao

11o.73

I II•so

`iZ•3o

R~y~ p/39 3o.oa .

31•Sa

g3.00

34.00

3,5•63

357o

37.ost

3t•LS3

31=:.s 7 .

t, -16.00

~• ~° ~

14L5o

Nz,3o

y3-ni

1.00

1.0

1'50 .

1.00

. 1,00

0.70

1.3o

l.2a

o'y5

i~ 1. c. /

a"13

0-17

d•!ro

OM -5".S

O. IcJ

p•Z8

0,7S

0/2-1

0097

04937

0•/ ((

(~ia~~

U.097

0,21

0,oy9

o,S0

irl~

O•28

all

0.9I

~r~~

1•10

04O

0,11,3

2. 9~

I ~. i (!/t~L.~

d.Z7

0,25

cos

1.06

d .vt~

04»

U ,O)b

Urvl3 . p L~

Q.OZ

(fi(%

0.003

o DY .

o,ovg

0, 009

o,vos

~~ z6

,

-S1

ir i>,ar,

0/02.3

C•~Ly91'IoNia.- t1PP4.Z. ,9^-b L.D44C,e_ C.c1r.ITgc-T -

35"•7o - 36• 6o L.OcgLL`I 1- L% F. 6s' . PISS Po 1n1 ,S+s1.1dc,.6 FaPi1

w PJO PeeF6t'.Pd OQjW p9'Tio4 • giirtlekAreyg.,,,,-a

I•3(w~~-(

vNrnwred5uZ.CA

FeoM 3ç.3o- 38.‘Z 5oant-Mg-,,siv/F Po tPili>r\ w Cvrlus~97~ ~cT~ t J(L. Ot.,tl,aE ~ Ti•J ~. 9rnIS FW~6 IrJ 0- S~LPIJ14£ n~9T~

TO1S SEcr,onJ r}'95 9 ?T.E"Jo. taF zS° rol • t

1 t iw _ T~Pa LQc~d;. ~~SICL.~ !3!~!'r]lr-3jo~' ~ \

1FwM i-io•2F's- yo•sb l o-zo°lo v1.1= 6e • ~ 1s5 Po ~rv~ CPI ~ti6 -., a90 To .

5-10% elk. Ge.MSS Po ov4lufriL d /•...1 CuM,.'MX.7é

Te. DISS Po LA, s',gtL Y to-to°%e otsS Po ovt:mu. ‘ c..s,rlir.y T}},S /3r,lovwlT It 1 2h C011(

• /9 w rs. Fdu0,o, / P~~r r --"I so- s° To, ,

DDH DIAMOND DRILL LOG

SHEET: ii OF (~

lvETRES FROM t) ~

ROCK DESCRPTION, STRUCTURE & MIt\ERALiZATION SAMpLE I~lJM3ER

FROM OW

TO (m)

LENGTH Imt

Cu 1%1

N t%1

Co Ipvm) ( t1

. Au (gm (opb)

Pt Pd Inrz

...

C

43.0- q11.-5o rnrcevVAge-o

91165"

91 a b

9~{$7

9151?

94 ~j

9160

+

91.1b,_.So.go

9463

9~{~~

°I`i fo5

9466

9 r 53 .8fo _ M

14191~

43.(01

'H50

45-.L7

il6.22

~IG~3

43.00

~{%5v

.

co

g3 •SS

~~.Z,q

giocd

1.114•5o

LIS. Z/

'ib•r2

yb•73

4g.00

q9S0

SO.4i~

szSo

53.55-

S~~zy

55.gb

56.0o

o.139

0•77

c3.15

0•61

I.Z 7

1•50

1•~

I 6

1.05-

Q.,~

vi1

1 .09'!

0.10

O•il

0,13

Od13`f

O,D,11f

0•10

O/ 1~

+

0.0 bl

Q.071

O~Zg

.9b

6 0

/.9S

0,0S9'

owns

I%dZZ

0/11

Q,~ 2

-y 0/1 /

+

0/4§-11

040,

O.IS'

1, 6y

Is2

0,038

0,001

0.003

0,00q

0s01

0,00

O•d0 ~

0,007

27 O,o

O ,o33

+

Ô,dO

0,00

..... ISt*+'

' ■

~

v.e. era-en Jet.y sII9,e.P 9r yb°T09 • 1...c.. CyRsjperlt7nl9l- . y,1.2,4- 1+4.31 rngsslvE PoCs}% , PN[ t5% S:r0-r,.i~ç.t Or s-z°TU) . i4.1•311- 844.37 9s 96oJF sur -1- Tc/9•

Tie: N It Lo:..9: IrJ

y5.31- '-{3.3t 9 Po ‘P^ srP-I•.ICyEe. }) Io°TO. FiOSTGunJT9n.Jç Te: 3t~LP1'}'ID~~ .

y6-?L- yb•13 ,.ntCPr,roA✓`$+20

0.c. w65.ic, t 9? 30° TUq ~•C• t , ,5-1-1,0070.3 9.aa r'L.4etwi7FA e:.) en, J.P.62..pe,

4ry7+839s,'m a7J ce- sre,a0E-e-qT379 TcfjPeg; `I8-•(119 -5.--10 ,n M csl,T'Z' CC. STP_J•J(.ft,a. erse TO) • €.9T4 Co"Yro..i ,N11YJae_ Po

Lo091.14 Z% F.Ge•otss it,aPI.

CP~I ST2j~ef.e. 9,-$ °T~ ~Sv3l~~. 5ow to H Pl

!,Po 'trawl ~o, ,il- PP.dr✓t 5-05°:31Z -19 0•36s ~O. `t~ 9 QTL 5rL'tab~ 9r ~~90~9 Cv►sr91-aw6 NUnna-vcAS 6a$5 or IN .9,41 1'6 . ` 50 a 36,- go • FfZ. ryPPG5tS To 3E. M ►r.leetA TAIN F91.)LT Zo..JE

Te.E44++.1b ^- 66* 7c9 •

50. qo - 'A. VI rni rpnr"4,c. tQn U.C. 5+}hta' 9J' Ie Tc6( L. C. s+l9eP egr(sur Ieze6cK.gC. 9r 451'1"c8

"Tie. Po Lncou-~

j3. a- s3.1-15' e I il° 1= . C~. pt~5 Po

9 Z 5 M Pe t P~ sTe,.~►r~ ~é ~° ~9 •

0,4511.13-55.0o l3/-% IS- z5,% J•F. Cot .0tS5`Pv W h lr~.rTE; ~e.E. ~ svu~r~ Io/r.S °fiP~°~JQ T~ ~g•/~9 ~rGw.~O .~r ,.. ,/ -fc.9 a 55.00 -5.s.

-ay Lo-30"/o F.Coe.oits ro w n.1Er TIâc.TuPk. ® 3S.'~{0- 55.57 t, ~t.c~FiG c.9i~ GP Cz~kt2o 7'P~E,.at~b 3o-3.5

3'6.00 ~ S~s7- ~-à~'l~ ~.~e•nass Po w ..te,-7bc,Tv,e.e.

DDhi #: nitC9149

SHEET:5'0F Co

'ci vpa

DIAMOND DRILL LOG

METRES FROM (in)

TO (m)

ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLE NumBER FROM Oil/

TO tml

LENGTH to

Cu (%)

N rm

Co two (g7t)

Au WO

Pt (ppb)

Po w fr.IET TEx.Tue.E. 91401 qij 68

1469

9y7 o

9471

9siTZ 9y73

94 14

9y75

947(0

Tog

5640

51.o0

it-. Io

Si • 1 o

6o•bïs

(01.56 tiO3•00

(a3.9S

65.12.

(O(o•5o

6R.113

(o9.0o

57.00

5&.10

51,10 .

60. bg,

h3.0O 6.g5

ïw.IZ

tda50

F8•10

69.bo

71.00

0.590•813O,I2

1•0o

141°

I .oa

i• St

pill o•`iS'

1.17

1.38

•1' Co

1-5-0 `

i •

0.16

O.y1

0•0''44

0 i31i

O,OS I

0~023

O riS

0,04%

0.13

0rQ7~

0,02g

1.97

1,3$

0439ç

0 r23

0,057

0.0R1

®~0li

1,23,

0,033

0.27

i1.lU

0,018

0/031

0417

0,00l

0, OA .~

0,004

0.003 0,00( ~

0,0

0 ,00Z

0.00%4

0 î0o3

0,002.#

?p-"Solo F-M1. roe•otSS

59rng., 95 032oJe 1 Few I cr.-4•N gLE.t.5 alc Po, Pn Pe6sE"Ir •

5g.10 - 61.56 nrnce06oisePn .~ ~1 ~

eP uPPE2 C~PjGT 9r 3 °T~

t-vw cpvTc,i 49.3- 6I'-7'09.

5rs.73- 521'.17 a--s- oh 4ttS Po Zo,.jE refuvo1,46 35° 7-cj .

59.40- 5975 PtOG tr,uVJsE klc)}• to4E. t ~a ,,1.STTC,c.Tae.f,.6. Smpt}IB1GS ` ,.. 10 IV `(VV9)rNl(.4 PO W MfiJO,Z CP1 `T/2f1441r.1(o 5ug// 709 C-..7. . Feo,er (o o.37- (,o. fos PI,)r° • e..fC1} Zw.IE

Tex..•J0)...<o -L Tr19 w ''-'5610 013S P0 \CAI {.,o t>j-t.LY .

F-eo~ (~•s)s- 61. Io fl Gt~rJiTIG O1K.l:~s►r~ ~`u.c.Isr~25°T 1 ~ L,c1s 9T 15°-ray .

t..ocep.tr•( -s%nt3s Pa . 77e. Sui.PJ}11NES 0.'15'65. ii- m tceoC~gt3B~v u.c• $922.Pgi 50° TU-} . Le . Ge9ta9; i o,A9L &JT' Pol.EA, 79, 65'. l 37 °749 \ ~Z_ ~,T/LEn~nl,olG ‘.95

ci,Tia,•.1~EA !s`f /5-,' ZM.l g94 0E-,~ sJL}1~~5+

13/•,[ 64. ?lo- 6L1 •83 ^' Zo-. ZS% v. F,(ae, n)erTEaV u.e-FA IN 1P1 w,9 I c..-I, Pl 139,-lo /71- 64• 67 c?it-F.i.0+..1 G 95°-R9.

gr,-, fo(o•oo.•n ‘/i LA...10c PRy.F~./rsrA cselemiriqT/o,.J 7d r4E 01.,P1.96,

L5 \ 9T ÿS : foo °7-69 .

fo'7•17 .9 5MM a' y CR._ ST2Aaf0Ce_ -er 1-10°TO 9 FeoM (07..55-- (or. to 9 .S✓ it',n,h Ort.lec 5Tittr.i(0 cr.2 sJg%f IV. SoTi)

s7ru•.tbrr,es eet Mi►.tEe9I-I Z&.. w IA 0\9114 L-51, Pa w CP1~ ) q„IQ toil 0.94aS j7LanYd--`~ ~Q~niOTl T.f~ ~~ITG69Ti Jn/ Q1M5 .

ip8`iZfo- 4:+g-143 L-ç°/° G. Ge- 615s- Po ~ gj -z7 ,9 Sn,~M ~ (`f~ -.~~Z7 Po 57e+,.IVX 91-. eV' TO '

7e. Po t_aciN4.4 69.9° -ZI.14 N.tcp_ogosyeo or $Q ° ;c19 •

(V.,) (ppm)

9~&0

°I LigI

94gz

7).00

la .50

75So

la•SO

7L{.

7.5.50

76.86

•6.

I•~o

I.Sa

I.36

oloy p,o- S

0,0 10 a.v01s 0,024

0,01)! 0.016

DIAMOND DRILL LOG DDH #:1'11")-SHEET: 6 OF 6

I)

)v1ETRES FROM (

TmO) ROCK DESCRIPTION, STRUCTURE & MINERALIZATION ~ ÉR

F(m)ROM

~ LENGTH Co

(git) Pt %b)

Pd loot

FE1"J t1qte14,4g perlert•r•s te . puzz 057",•-• zs °7c/5 *.rqb+iS0rC)9.

110s1046 9 MWoL grelotl,.r; oP St11pt11DE,S .

Mo,,,-, 1S 7t{.00 WIC-moA INE.ToflrYi,p St)SfJ 7'cO tJ i'/o

EviyEoe9i- lP.O.ceAST~31.iJzF,a P~ - -re_ Po t t✓P4 1.409-14--`/

?E_ Po .L~c j`; ~

1-) . -r6•819,,,,

1-I coeE gchc eS S'oetiN /4 e00/4- isloe9,.10• j ~ Q G,

9`î7c 0,431 0,04

0,0c Z

G~ ÛUIMORCA ~,~5Eg~JG'G-~~~'CIEZ LTA NIC-91-7

DIAMOND DRILL LOG ©E ~O' FAC ü üûti~

AREA: t9IcE r ICc & t CONTRACTOR: Foei96E gEnlOf1

CORE SIZE: 8A

CLAIM #: 3~o3L52. PROJECT: nlicogi L9K€ DATE STARTED: ? 1/o 1 I91 DATE COMPLETED: a6/0 ,1 /91

LAT: I mE_ (0 /\1°71) DEP: IH-zo E ELEVATION: DDH #: 1,11c9J-7 BEARING: 18o°9z TOTAL LENGTH: -iw.015^1

LOGGED BY: G . Lot,*

SHEET: I OF 5 INCLINATION AT COLLAR: - 70*

SCALE:

DIP TESTS

f~ 3p.5M @ GI ~ • 7a%n

67~

?po C~~s7

METRES FROM (m)

TO (m)

ROCK DESCRIPTION, STRUCTURE & MINERALIZATION ISAMPLE NUMBER

FROM (m)

TO (m)

LENGTH (m)

Cu (%)

Ni (v.)

Co (ppm)

Ag (g/t)

Au Om

Pt (ppb)

Pd (prl

' 0

• ~

-[$.pg

O. (oa

MrOWM- CoRE.S6 GRAnJfD GHMR—Z.0

/48'3

gNgq

I S.ov

16•S-0

16.50

17•97

1•6"-o

1-39

o% PL.

Oil

/'IIC

0.23

" le*

0.006

Mm' 0/90_1( ber-Er.1 cod.oe- ` Mo7ïLE1N OFrwipre bVE To

P1-0610c4-49sE • CQMPO51noh/. f00-7o% P~eF~o)6 %~4.Mi.JE ` 30-140%~ fjLTce40lo.-.i '‘ t.or.)9k- MoAkp,J; £U1 -=49e•So,J/5:1- tZŒ6 LnG911-~ \

9 l-lPi11goLirI"LEA ) Loc911.4 srePE^MAl ►zfp. Ovrfe.p,l. we/904 N)9c1..IE.01G ‘ Lx, c,9114 ST2o".6(-`I M~.► \/ETC . r7i..Jf,0L.lr,0r/ohl :: \I9e4E5 L.ocr91.1.4 Feor1 L I% O ISyriw.in1Ed To ir1I — M51.SSt a.1e-

‘7o Mf3SSlVE. SOLPII IoES CA CC.✓e, 95

PEIMq2~ n1ET -r~,c.-r~e~' 29,.30 d9S s,—eJ, &ecs (aq e.~FrnoglLa zEA • -ME Pi2,or.Su P~ svL.P+~~s~/-'~s i9~eE t ~~ hEC2k'l3SI^)Co c7eAa oF 984;.JKl9•.1Ck.. .

P`IteAffT'TE \ C1-1t9LCoP4%T~. , Pei\ITi.9rJaITE 1 PjeITE 1 Mo~.~@bC~c,~.

M 1 GRA GiStge.C! - 15 -74.E. T . J021'(1 USEIN Fol- Tf}E- F1 rJË_ G.V)1nJELy

V02.5.io.J ov- -r4-E_ 9goVE ME,.JJ (o.J(21 Ur.111 . G9'.SJ•-) .

B • 4 I- 14.I5. rEice~egme..a . .

J.C. !Oat Or GROp9 j1aJq1-. 1-,C- dBl.aTf.29TED $4 CeC?40niA wee .+9T . ILI .Ij n1

L 1 T 615.5 P„ l..ocA1.1.4 .

LaG9u- °a Tz F.6e.D15S po . ~ /

DOH #: 410a1 -

DIAMOND DRILL LOG

SHEET: 2 OF5'

SAMPLE NUMBER

FROM (m)

TO (n)

LENGTH (m)

Cu l%)

NCo (%t (pRm) (g/t)

Au (9/t)

Pt (ppb)

('d for METRES

FROM (m)

TO (m)

ROCK DESCRPTION, STRUCTURE & MNERALIZATION

1.009t.+4 1-L%

)95 9Bove ) reef-)

:'-F/stU.

t0.477)1,.1 y FE(1,3 1..FrJCoT1f.

2.,-$% F .Co,e.tJlss

5.9rne ~•

LA051.I-1 Z%

Fe.v,.1 26.90-2..7, O~ C• s~ Po c7~I~LL-,

2,Fs.b1l- 2â.9 C.o ktTq1 ~S

z9.7o- 311,00

31.00- 32.•t1 srG~or•15 .

zs-% r. Ge..

rg,iPFI1(3to_irezefl 5-10 ,Y„..-1 (biz&

? lo°lo r. wQ.

Fi2~d"v2E3

q1 35.00 q 9r Z2,° 703 t)IFF. . Sc.GTk),-15

41010 01s5

35.145-W450

o°Tr~j • (COW-0 19 1-S0 Be-

.D)ss Po .

I1.-i8•- Zo.il q PEeeoor,rE(SF.ePEJa7a.11vaj,, t,PPF,,,e_ co+.lrOC.T D1PoSF , I..oLnlEzco .r]'~99' s+% 9r

19 P9P.Si9l•1-riel oi6r5TeA >C,r.NouThi;, .

---1 SF,e.PEr.rY,,.11Z,Fp , PF.e(a.9T(7- E. X.E",oi-1 TJiS 3-10c,.,,?5 1-.fl c)x.1,.`I 4.: Iqo e(55 Po .

Po !-dclyIt..~ .

as 9p487, go- w z-5°lo o1ss. Po L.n09.1.4

o)ss . Po .

SERpFiJTi•Je7,eo. Pc.RaL`.onTS. a)tCEfs11LX l;•~v. 9T 15'3\703 o 69 ~ L..c . ~F= vSE • I~oST C.41,47-,9/,JS ~ 1 0 o)sj

. ô ~. T~ - flog- 9492- e~Eflc~ifA />~S sEePF~l7,..3,r~ .L a9tL4. ~ ~ D/v F. co~. l3 t s5 Po,Lc,

sF.ePt•i.lTa.11zÆt> 1 ..10 Ml,.tee9L4z0ria4 Vis1ac.E ,

S6ePû"lf 1+J1 ZEN {,J 2-104iSS Pa 14 TI}e I.!✓S.S l)G7rxEts

914•85

91-Ig(o

01487

94gg

9q39

949 0

9L19 I

949?)

9419 ~

91495

9y 9&

T-197

91.118

9`i9 y

I-LSR

)q.oa

Zo.$o

Zz.00

Z3.-5o

Z5.0o

Z106.0

?.8.00 e-9.50

SU

31.0 0

3z.-s0

34.00

35.00

3~.~jr

345035•00

tg.0o

?,0•5o

}

t2.00

2.3•50

2$00

Zb•5'o

eFf.00

s.'.00

3~G•0 S

M•CO

t46-0

35:+~

?b•~o -.

1• ) l

I•50

30

I•so

1•5o

I•5"0

1.50

1•5o

I•50

I-50

0-50

o.So

o.,

1 •o s

040

0-la

OM

(5.18

0.114

O.IS

OA,

0.20

0.13

040

0.1g

616

0,$0 .

"I

O.oB

p.it

0.34 ,

0.39

0.2$

0.2$

0,3:;

0-33

0.24

0.17

d.22

0.31 '

,i9 ch

0.9a

'2.30

0,16

1 • ~0

O.00S

0411

0.011

0.0:8

0A1

6,012.

0•01,

0.0o8

0.011

0.009 .

~ 0,017

0.017

0,0 i °

041

0•00 OIS 5. Po ot,Atf3t4-

ti ia .?- 2.--56/0 o tsS Po Tt_C.Pl r w,y CouP1.E op or' Pc.

Po !H's !✓wCTilI:E F11,1, ,9,vcs ..cer -rex-rveE ~ I~91etif.tE 9r -~ $o° 9r.►o /~TcA ~G I''10 CP~ o~1~.P,ej1L~,

l-Zcr-, sred,•J6rce or PoC7o-8o~l0 t Pr, (20-30'/0\ (-3-415 Is TVE ~~~z- oelé~r*r,onl l IT V921r5 19r

oF 774E STPJr►GE.t•). T>lE (loSr P.oGk. Co,.17-,,NJS Pa .+

Pf.e.0o110-6E..eT~1

u•c. sl}9,en 1 "rr9 •

1_. C. sI}.92P \3-7 °ra9 . 1T2. Pp .

I

DIAMOND DRILL LOG DDH #: n11cq ~- SHEET: 3 OF 5

(mpM rt p METRES

ROCK DESCRPTlON, STRUCTURE & MINERALIZATION SAMPLE tk".1MBER

FROM (m)

TO (m)

LENGTH (m)

Cu (/.)

N ("/.)

Co (pvm)

qq Ig7()

Au (0)

Pt (nPb)

Pd ha.

^- 5°% F. c,è.otSS Pa o f=Etix-L . 9r 36.78 /9 S,►•, M CG 5re,,,+Yoge.. 1500 3fo •~ 0 37.00 O-So D.70 Sv3// TOco..rr.graS Blf.l~S orG C.-Pi 65 wEU.. ,9S.D ►ss~. 0.70 0.018

?.% , Iola Po oJ~.j•iL 0 ~7,r 3-7:5`i 9 -5",,\ ,,n

1.51 5; erra~ or 6Z° 1r09

cl &"-o( 37.ao 38.0o S0~ j. oo Q.~ 033 Q~ 01Z

• 38- ~•,45. PGe1o~TrT~ \ t.2.c. ,L -rc9. , ~.c. . Br 30° Tog •

g•.~4S- 39.00 , >:-?,,% NET T,"--i ue.F.A Po w ?e. ep.1

7S'0Z Moo 3q.00 1-o0 0.17 0,9$ 0.621

/ al,r•1ET TFJcTilef..D P

c, tz

. as rnixti •h Z-s% r,Pq 1-0034.

s9.91- 39.17 0 Po ? Pn sTer,JroéZ 95- yb'7CI • CrvaOe cPy~

9503 37.00 yo.00 1.00 1.09 0,72 0.01g"

Loc,9>14 >)o'lo o►5.s P° w M,".,oe, cPy . iyi- 1.40.a9 9 1"1„,,,.950`l yo,00

414o 1•0o 049 0.bo 0,02

P0 sTa alokt I. Tc1j • 97 1-10.5g 9 â'- 1 G .f„n GA91.16 oF Pa % P.,

Or 304'709. HT 14o» 8s' fj Z n.r\ 89n1D OF Pd 9T 62,° YC y•

111-qz. z.-51. ISISS PO 146- WZ .SO G 1010 dkSS Po ;re. ~P . \ q 505 ~ 1 ~oo ~~,,So i ,~o Oa 0,5.7 0.01.i 1.1•-16 9 I v.,r. POG srei-ioae -I- "Ito. ) Wz•&S .g Zr,.•, Po STie,,4¢3F-e• .L Tc, • 142...8g- 1-1.a.2- > Zo %a NFT TExTv,P.F1y Po , Pp

9506 yz•...,.ro 1-1:.).o0 1.50 4r3S 1.08 0,026

9r ilg• H 1-n,,, Po S7e.i..IGf.e 1. 7C • iv- 143.3g fj 2-3 MM

Pa STP-J~~. flT r030 Tc" . 9T 113040 .9 I cirr , Po y Pin sTer..366e..

4YT s2°-To. 9T 10.6o -7»-E uPP.ce Cd~7aT op r9 su`Plf ,6c Toni‘

-o- a") -ro ti Co Nrr9,n1 r..Xo r'i ZS% ►s3E T TEg.TUPiAA Po> GP 1

Feo,.) 1.14.3o- 414•41 ,9 Co2,9..1,7'1G alc.E 9r 65'-rrA ti Co,vr~,,./s 9507 11`i=oU 1-43:~ 1.5g 0,22 0,7o 0.0t8 1-Z`Jo 16.1SS PO % 9s weü- otS 1 1..... N sre,,.u~ or Trk. u.C. // w -rdE eo,.rrIc.s`. -r(}K 14osr co•.rrgr.. 2,512,51,3~s r ~ r. Ge.

L7uQ~ ) Po a:, Mr..toe.. C•P"~• NeT7~ Fj ~nM s~.~.36- yS, 5..k 9.SE2P~m^t17~ P,t'apvi lT~ 51,c1✓Co u.C. p1F:h~e t Lc, 2aRrtvE1-•I sr}iqi2.P t?T 35° To ;

oVc0,24.- ? lo°Jo v.r Gz. oISS Po. Hr H6•2,0 -me uPPte r-1ry11T oF 9 (:150$ 45:5$ 47•00 1.4z Q.ib 0132 r3 , Q 0i &-Srnrn Po \PrI , CPI, Mo 5Ti2,.~~.,~ % 4,unI~a.,6 5u3 // Tc~9. 9r TtfE

t~95E GIP 'Nits STre,.J6E,e 1s ,3 i.-&- crw, (3I-E4 oF fk7 , ~o.1?r, .~P1,~

4112 .p,ss Po L.ocf•1t.t.-1 . 95o9 117.00 Hg.00 I.dO 0.13 047 0•005-

5"-- 10 °14 Dtss Po w Te. CP 1 fJ.l Ep-jIJi~ 9510 LJ~{.d0 ~~0 1450 Q,21 Q '0r,3! 0r011

95 9govE ) 9T SP , 94 9 I crn-, P0>P-1 >Cp STe.1i.1 6Ee .91" 75 1f 49•5-0 51.00 ).50 0.24 0.92 0.017 7f-. dT.-n

DIAMOND DRILL LOG DDH #: •

I-1 OF 5

METRES FROM (m)

TO 04

ROCK DESCRPT1ON, STRUCTURE & MINERALIZATION SAMPLE NumBER

FF1OM (m)

TO LENGTH 1m) (PPrri)

Cu N CC' • AO ! (0)

Au ':110

Pt (13Pb)

F'd (IV

icir -.1•LT t) 5rrNrn PO>C-P1'7 N it." 3 srei-Voez. J... -ro9 a 95IZ 51.00 52-6 1 • 5° 0.27 0,50 0418 -4,60. F8vil -5-1.1z, - s)•sb e 5CaPEr•41 nil Pm 0,anrc blicsisio„

1/24r4 4 aoc Tc9 • C-0 6-170.:0-35 I) FE v.) evNrec_ pi cvaz5._ rni r jje, Pg.. er 51,67 .9 I ''clr•-•3 C.P1 Sfeb-lrarce• 17 300-rc.q. t9T e 2.-5-revel P-1 57-Pa's/Gee- er 70°T09- qr 52.19 '93r.- r'l Pi • - -

00 if7°1c..9. OT 5.51, intnri'‘. PI , C.PI S7P-Jr,eatie are / 2.°)0, .

10- IS' lo AISS 110 )0,(11Not.-.C.P1 1 0\ICe,24.- . Peary) 51./0- 53,z2 , art. sreir46.f.e_ .97- Ii5°'7ci, % Co^i7,4141"-vo "Ni-Joe- P i to 7;41

5q.93

9513 sa.so 532.2. 0 .77 0,2o 0,67- 0,01g°

1).0 . .5:16*.P. 9-f 1..15°Tcd9 . L.C. &&'36/3310,0231, , PeOlY1 53.2-51.3L1 '31T- srai.36EZ_ 69- e0°769 . CoreMin 1 I f.l(v 9511 5a,n_ 514.50 1.Z53 0.03 0,10 0,00-7

0e, Po ‘Psi ,cel ;5 -7-E, 1-1-.) . ,97- 74 co.sirocsr .,..)17-41.,i -ride • 40-51-- -..çplo 6.is PO 65 PniiVe cifki 4,vo poirJot.. ")o •

s--1010 r at • ss Po le9^.(761,./P,./e 4. )0/o pit 5 ell crve.P.-,91.1. . 9615 sJso 56.0o I.5o 0,25 0.1.5. 0s00 ,1. 5.5.3.0 & Srel (51.Tt. Sre.i...r,42_, 07--55°T0 iniNoe. Poi-Pi -

0-JELL - ?.)/o r•Oe•AKS Po • 61 50.0,4 , I 0""" goi)Nia dr 5-10% oiss , c PI or n" Tc,9 • z-5°Io F.Ge...61.s.S Po l e,0.4,-re)mii.,16 ,01% fitz cfr/ \ ok/e41-L, 9757.0o

9 S1G

(1517

so.00

s7.00

57.

57.qb

1.00

o-96

0.14

010

0.33

6,51

0.oc.2-

0.011 , I Mt." Po 1 c.P4 1.7e.-0.40.E.t. 437 afo p "r09 - 47 57. 2( /5

1:12 › P PAN sre.).166.7_._9757a-c l't -

57.9(9- 51.55 reic.e.,z)oge,e,f, 95 R. 57. qb 57.5-5- I.S1 0.06 044 0.003 u. e..919eP 9T" 35° "Tte. /... C • &r.,,M710,•.1,9)- 1 aur Ns-Th.10x er Se 7t9.

fyneossourrer..A , oisrbsic-r- Fol-P,Ti."4 *7" '`-' 1•10°70 ,

rep., 9i.11 "To 59.* /3 Grier.IsTI,C. At 14-E i".3 C.C.. 4.7- 32° 703 Lc., .9r

Llod -roy . -nits u.-iir iS, 1000e1.4 Prlie4rtZ,01-1z-eil r..-9 .4. Plo J-AdAyfro?

Loc):At4 .._. I/o F.at.S Po . t.tving.R.Pas C.C.. PH-LEA }-1.9"Z"^JC Fes) ril zo-.2° TCY, -

55 )1 5" 7. y5- 61 .00 • 1 115 • 0 14 , 0 col 00003

sornE 4" /go../E... ton- L.:::).?..'?..10 p)ss P:o i...0011.4.1, ,

02,..5g_ 0,3.w ?..... as.% Po tc.i> 1 6,579 /5'0 \ ;5 "ier -r.E...x7v4.E.

Morn (034g- Gl• S-I i, NALSV ar 5erell-A19S5. I NJE CPA/

952O

cj.5 z,1

61.00

62..50

6t...50

64.00

I'S0

J5.7

0.2.2,

Q,5 ,51

0.3,

072. 032.

0,007

0.014

Puri\ 63.57- 63. 62.- , lo - aolo F.6t.als.5 cri \ eovo4p1 cei&riEo

DDH #:41c91-

DIAMOND DRILL LOG SHEET:5 OF 5

FROM (m)

METRES „......

TO (m)

„,.z. - Awl< DESCRPTION, E h `JCTURE & MIN ERALIZATION SAMPLE

NumBER FROM (m)

TO 04

LENGTH (m)

Cu ri„)

(N1 rm

Co wpm) t

Au Pt (p1:40)

I'd (nr'

.

°

iwoL. po > cP1 cz;

. er.r.),_ivyt sp.it-;.: 3E-C-710,NIS ( I-ot '64.e., ;psi LA.)16X0 .

2f,d/o Niss Pb C.3 Py iNr. it cpi „-,-,-:, PICT rE-x-r674-6 -

micfr...o2t.0 _...........

cis-z

c..A 1,,(7.-5.$b

9S?4

Cfs'es"

qs-20

950

45.?...g

95aF1

,s ,::,

(Mg

(L 40

67,00

6a.50

70.00

-71.50

73.00

,

7 , 0

7'591

'n°0

6T.50

(07.00

(*so

10 400

7/.50

13-00

71.50

75- 611

77.co

lt.osi

1.5'0

1.5o

i.si,

I •SC)

1.5"0

1.5o

1 .'O

I.

I . LIG

i.dt

oao

0,20

0,23

0 . 1 S

0,1q

0,093

0.06

0.12

0.27

ttn

0.99

0.91

0:76 '48

0.05

Los

0.29

0.ID

OM

0.29

0.13

601,5'

ace'

0 0

0. 0 1 2.

0,02Li

0.0o9

0,005

0,013

0,08

0.0o

.

U.C-. SOEF. .9j II. Tc9.

-71}4.. L-owCe. Cr-iniTley IS 'CLA31,1•1 irc,,, 5Ern) - iip9ssNE. SE,010/4 co ...r719-k.11,-4& Po > P//inc i // To TV: C0"174C.r.

/77 68*•18. /3 lc""."‘ &yea s-rt4...lear.e. C3 ind,-ssutkr, Po ,Pe\ ,i9.7-3e To -

Cc ii...trcf! •.,::-R.Pic-rit..E.TS . . ,,r* 5 0 L1)41063 PQ 1° St T . *T" bcf,.0 `," f ryl".‘ (1, ' ---R, j„ibc.e. ,A. -j-ci9 .

Fe.on eq.91- 'T0,00 5.- - Io % F. ..-Pe . a4ss Po "re, x 0.ieviti.. 2_0% 1-.6&Ss Po iZs. :Qv- TfevAree . reern7o.7,9 - -70.7z ,9,..3 ,,,,,, 051- sriens-AsivE toNJE 'rez"JaiiNi& 3o°7-0, •

pe,o,e) 7j5-7).5V- -• 2P6/0 4)1$S P.° i cP1/ G.217-47 1 9 1,3E191c- sOft- zdr-Je /9.3" Lie-rc.*. i.oc.91-1.4 ;>5-10 % ait P0

76.1S- 75.5'4 r.-11ceoet3860-o v.c. sild)e.P I 7ce. LC* ‘I2.4 621,0... . coNri-jws. nivrilRtasoS tHieu,le • Irvw‘ PimaveLS , cc FA-CF...A t

f•-• c:s° -19 I rev./ Cot. ..frPjf"J rntrJet- py.

3-.03 9 S' one") 0:11 52-m16a- 91- el' c'Tc9 ' (7%,- 9 1-2inte‘ ges--40 or- P 1 , Po /170 -3-1±c 1.4 ore- toc.13-qc.r. g/...1 -7.2,0- r5 go eeedABN Co ez . eo% R.E,Govez-4.

zpq Loo,u4

TT .00- 77.5o OS OFJ3Ve ‘

E.0. 4. 7g. og

Ili SoXeS or coee. sioa-b 14 e_o In] .kJo.9 cic t

NIIIGfq1aGl-WCA\ RESÛÜRCL.~`S EUJoo NIC-91-8

DIAMOND DRILL LOG SE©FA© T

AREA: ,Jtco3i L9 CONTRACTOR: Faa.9 &E^10iT CORE SIZE: g0. CLAIM #: 35o3a5Z. PROJECT: rJicogl 1-91GE

DATE STARTED: e.5104/ 9 I

DATE COMPLETED: aslcodcil

LAT: DEP: ELEVATION: DDH #: MICA I— g BEARING: I $O°4L TOTAL LENGTH: SLf •7g •n

LOGGED BY: G. L-otJ%

SHEET: I OF L INCLINATION AT COLLAR: —5p

SCALE:

DIP TESTS

46M yy o

55M Li3°

o o

METRES FROM (m)

TO (rN

ROCK DESCRIPTION, STRUCTURE & MINERALIZATION $AmpLE NL1~ER

FROM (m)

TO (m)

LENGTH (m)

Cu (%)

N (%)

Co (ppm) (cyt)

Au (cyt)

Pt (ppb)

Pd (aO.

~j

2.1 .19 MEBIUrr1- CoA2AE GE9,,J6b C7RA3?o

. neA_. 69e.IC. c,zsE".1 Cc1Lce, ‘ Mo7TLED OFF w i-PrE ouE To Pi./9&IvG,asF Corv- POÿIJ éOtJ : (OQ-7o % PyP'.OSLlavEf tlLlJlrqe- ` 3o- 'id % P,./9G-

1 FjcTa/j,lol.( : bJE)91G IrbbEAA,rf.t.`r C/9edSoNf3TI7Jr..0 1 LOCi314

ljrr1,'1-118om7124b ti SEA_PEn3Tinl ltrz-D - O.IEzipt.. w69n4 N14)GivGTf Ir- 3 Lacg>4 STeon/ - 4 iw9Can,rcT'1G - rr~►..(F.tou zpTla.i : ~l~f ~ If.s t~r~+~c(é:~! re..,,,-1 Lt 1Ss&r-,,rJ/jT6, ô s5•n )-r-Y)ss 1 Ve. 1 To rN9Ss I.,E . s✓LPIi IQ ,5S oc,cve... ,9S' PI✓iM92`( `nIFT -TE,)(70ez, ' )9,4a os sTer..IC-,P-e5 (A)46e-6 IterY10gILI?f'„J~ . -ME Pe,n,UP/°jL so-P4)06.5 9C.E, /•-J c.E.GPJc.,~$y.ltÿ' or•-cF, e or H3vp•rSoi\►ce. ;

Pyeef)or. ,x ~ ct><9uop~{~Ir~ ~ P~,nxTc~.to,Te ~ Py~ ` ri-)01,_.,

i GQo 6&8g?_O — is "5-7)E -3-kPXl c.cSE& Pit.. 76-1E Fin1E. sei91MGd reI F -711E 9/30ve Mrcr.irlv^/eD urJ/TT•

CAsinle o I. a3

L 1% a ~.Ge. bss Po o~ee9la.~ Or I 4-1• lg 19 k....... Pi,/', sTc.l..lr~.~9T ~1~3Z. 14.00 15•$o /-5-0 0.06 (7.1~ 6.01

%° IC', •

a- 54k oliS N 0-.1 LL- 9533 IS-5o 17.00 I•SO 0.16 0.14 ` 0.0o6 es qg°./F : `153iÎ 17-00 18•00 ~ I•oo MIR n. IA n...n

UUt1 1~: ~~~~• 'I - DIAMOND DRILL LOG

SHEET: z OF y

PROM (rn)

70 (m)

b1ETRES FROM ROCK DESCRPTlON, STRUCTURE & MINERALIZATIONERALIZATiON SAMPLE

NLRNBER (m) TO (m)

LENGTHI (m)

a t%)

N t'/.)

Co (ppm) ( tl

Au (g/U

Pt (ppb)

Pd (nn

pij36.,LIcI} sEL7Io..l 1 Z-570 Als.5 Po ovEe-J51 - 9.535' 18.00 1140 I.on 0.18 p,la 0.007 Fe-°M 11.00 - Zg. o0 F-r,c.A Ge..90,1so CgBgeo w 'IP$ 065A,9r1 onlj(.

corvr9c.rs - _ __

_ _ Lac,""i z% a I SS Po w -re. ail • 95- 3,(0 19.00 2.0. so 1•S-0 0.21 0.17 0.006

4_- 1°10 o Iss 1°C I.00 U4 . cis- 7 Zo,so Zt•Uo 1•So Oa O.I14 0.006

1-V10 olss Po o./F.è/91.L.• 953t t;z,00 Z3slo 1•S0 033 0.35 0.10 FQoM Z3 ,c11-2..14.141 sEJ2f~1im4 ZFd• zo+.le 1.3._ TO • x Co $4 1-9JoNI1rsI (0 rn,,.loe. Po , CP4 . JJ', a4 . wo 9 5~in. 0.7z SYQ1n16,(e 67-3Z° Trs3 •

9539 2.3 • s0 a5, o0 1•53 0.1Z 0.15 0.006

65.0°- z5•) PL.0G•ev-4 Zd~ =--- - 10°70 • -34€sAyrne res,--1 el2.5-0- Z7.o0 • Te su(,.P>)IIY'rJ oa&P~9tL

9 5.140 6,,00 a7.00 z•oo 0.09 0.03 0.0o3

Fe.vM 2:7• 4-4o -Sc.07 s6e-PF'i•rT~•.rlt.f~ Gag Mp - T1),S Za•4E ti95 /3 95t.10 Z-r.00 2,g.or 1.07 0.09 0,08 0.004 Sl•}1,eP uPPf.~ Co,.Jr9c7- fli $°70, • ',ND A) VW--116 L.owR-e. CoNT9cr 4-. TO, . = t % Po o vEZN-L. .

Pl-96erc,il % c. Gt. ro8t.g.eo w ~ 1 q C5►55 Po ave,&yI-(, • 97`1z Zïs.07 z9•5-0 P13 0.06 0.06 0.003

es 9sovE cis-143 2.9.50 31 .o0 1.So Om; 4.07 0,00 11

L 1% alms 0~.1~:-% tTf:. 4 eY ~~~-L-~

960v~

01003

9~

q~`f`~ .

9s45

3).OU

3Z.5o

1Z•50

34•00

Laso

1• -50

0.0~

0,0y

~10~

0.02 0.003 OS 9gn»lE 015 `ifu 3`1.00 3s-.S3 1.53 O.Oy 0,02. 0.003

Feonn 3S•53- 3S.528. MlceroGaaeseo Q.C.st)9eP/jT 63 °7o .)-.0 . , 95.17 3553 37.0o I• `i7 0d6 0.09 0•O0S st)frtp 9r" ZSaTC/j . Porn 3(0•7q- .3Î.4o eD111,1P CotE ^' tco% LF.x-oI/rGe,4 •

°"14iLl. 6 I% Nts Po ) 6xcEAT )^) 713C /`/1,u•Afo9~a wr}tct) IS unIM,N6e9L1 ?.F.Q.

18-.1 -1g".(47 iq.,~GA.egeo l s,),9e.P Q. c. 9! 35°7e/9. st}+9eP L.c . 95'18 37.00 .38.S0 1.50 0-05 0.05 0,005 er. NO' To. 7►tE yosT eact. ea.,rP,..Js Z% eslsS Po Loc9c14.

Fawn 3qp4- y,O.aS /',1ceoco9.âget). ' 9117 .18-.53 •oo 1.S+o 6.08 0,09 ' 0.001/ ~ . 7~ (...C. I . ~"596►~+f~O /; S49e1) 1).- 13-- 25°7.03 ~ 9 Sut,PF))~

tiotiLo..1 WIJ•icG} IS 4- TcEja 7L. ,Su.-At) IoES w17139n1+ TO MIGeO w►J,tF_ 711€ C.°e. 6°Sr CO'~~Ns Vo 015s Po .

_ , ~,

DDH -

DIAMOND DRILL LOG

SHEET: 3 OF Li

METRES FROM (m)

TO tin)

ROCK DESCRIPTION, STRUCTURE & MINERALIZATION SAMPLE NUNEER

FROM (m)

TO GrJ

LENGTH (m)

Cu P/•)

N P/.1

Co two c

Au co)

Pc (ppb)

Pd (nr

_,.

FeoN1 0.0s-- S- H o. z1 , T~ sr-v9u. rv c.e.4)0A368o ✓NirT` 7ii►5 sEc,rioJ co•-•/r~9r•a5 2.00 SuLPll1sES 9s Fr9crvcE Pl,-t, w Po>Rl. oe►arCe. --L• Yc1j.

PE...! I-3M•h P°›P•I STeJ,./6E2â 6r Zç°7t» /,•4A4...-rc1j • R.pt•1jt-1d Z-% F •Ge •Di.SS Po w TG CP1 •

Z% 41SS Po t.nc414-1

Ff.orn .43.6-s-- 143.(97 9 6eJ.liT,c, ollcE 9T as°Tcs}. 4o5.T ecoc Cs,NT,rhls G I °I o Alss ,i'o ; l2- C.P'4 LoCFj•4•4 .

FepM qS .s7- 45•6T- 9 o►s5 - s.n.Pr),n•E sTe/•.I(oF.e. Cokr-P9,..troG ... Zo'/o Po liv,:b• 5-10% CP1 /9aQ 7P.F.,as.P.4 60°' TU6) . Fevr.I `I6.00- y6•45 >2,o% oJss . SuU'>i►m-s i7ti CP1 > Po •

1.16•`Is- 50•12. rnIc.e.oGlBsP..p

9550

9551 10.5o

9.55Z

0I5-53

955:1

95•56 /.16 ,q

1556

9557

~ 955R

4591

950o

1561

95W?

9~63

2 jo• oo

NZ.00

y3.50

e.15-.00

1-1.7.

41.00

•5a• 1 ~

51 430

9-.0

-54.00

SS.So

S1.00

-s- 47-5o

yo•&-o

clZ.00

lasso

45.00

0,4k

e19.410

So•IZ.

51•oo

g. g7

514o

SS-.50

57.0o

5s.50

o• 5o

I•5.0

I.50•

I,So

)•L45

d.9$

1.T.0

Ha ,

0-138

I•5:1

I.50

1.50

I•50

SvO,Z

0,2o

0.07

0,08

0.09

ate

0,32. 0•80

0,052.

0.09

O,Z%?

046

0•2,2

0,z,

t

0,I6

I.60

0.17

6.07

0,06

0.34 ~

0•02S

O,Oq

4,11

0,22

0.14

0, 00

0.i6

0.Z6

0.032

6.008

O,Ooy

6.0011

amp

0.003

0,04.41

0,007

0•00B

0,007

0,008

0.005

0.01~

,,.

04,56,gErLUl.•1

u.c. RaJ9ï'Jva-1 sit-Joel' 9r .35-c' T09 - Lc-- VezA rooDHTio..1/3L gu; W 6 F6r,.Jr 7P.I+No uF-.. 1.15 #10- -

117.10- '47.1 q q m~,vE Pc>Py>lp,-, sTP..1..1C~,a ,97"--, 3S°TG<!•_AI T)HIs ) >+•eor~ L.17.01_ y- ~i7• ~t7 ,

10 _ to % F. oe. Dlss . Po ?•

Te stil.PJj,t.eS •

1-0 C9124 L I°/o F•6e-4iss PPG

FP.ar^ 50.2.7-5'0•78 ^-, io% 6ISS Flo ,,M,.JaI: C.q. O, So .'lo 9 5 n„I, Pi ,Po cot sreJT46a g3' 3S°Tc9.

5-1 .?..0t-5? .so sEe.pt,.frl ,,+ ►txe 2-5.14A rAe, Dits Po u,Jc-eat-

ovcay„I, I-Z% F.oe-ass Po s"..- to'/v atYs P° ,,? c.p1 Lov3444 •

eh, uns Pa 400714.4 .

Fiev,.g -53.-c/5--- 5-6.g1 Pt96 itu ~6 ^ 70/ oF~ ~t5 eo 15• 711-E Zo.JE ills 9?~mo aF~5V 19 •~ 71)4 u.C,~„Io ~,7ae0r -r44. c..C. a°Ie c•6e. Po 1 pi avce,94.e= .

57.09- 5'£r.,0 59.„IE cw9e.~ Gey,JE,t, Pl1j6. P-1C.34 T.Pa.E. 9s19goVE' u.c• qT 58°TC13. , I--c-- e-r (.x307cg . ► - Z°lo p►sS Pb dor-•t{,

DDH #: a.lic°I!- DIAMOND DRILL LOG

SHEET: 11 OF Li

METRES FROM ( p ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLE

NU(VIBER FROM (m)

To (m1

LENGTH (m)

Cu t%)

N (°~ )

Co (ppm) (g/t)

Au (g/t)

Pt (pPb)

Pd Iv

1.003/4 L% DIsS Po

FeoN1 (00.4(4 - 00•9 c • rvvyitsiai t f'u3r0 etc.J-) 01 Piza.,)auS z,04ES

FP,3M 602 . •95 - 63 •Z.S 9 QTZ 57f3+n1(o~ Coavf9i,.la.!(~j /jGclX~

ouvusd Ca7r9l^'s‘ Sug// Tc~ • +~dST~ con)T5,-)5 -it sor-Pt1oe5

SEer~fi,J1~.Jm 9^p~~ ~ 1 L-0691.4 6% >7ISs P~ _

F3.5 0&"/e. i Peo,h (06.)3-G0•37 '9 c°0./1510--. DIKE 9r '2.to.S°To9, F1oS', RccJL cu.JTlnls Te- so(..itI)10,F,S _

, Feo~ (do•)s6- ~7. )~ q Pi~ P~c 7p..tE c~iTgv~lk✓v Go-7o% QQIa ~} 9cicu49e.- i9Ntira)ta%- OC.rvING.XlS 1 T2E,4b1•.iG^• Z,(°°fc9-, ref3M 67,00- (2g.00 ... 1ty" /o F. roe.. otss Po Qva94, , FE.o..) srem,t.G-

@gnlao^nu'1 oNUFAIJt.o. Qrt-ICt. 3TP-1rJL~~ i°err$6.17-,L4 Tt}e. sf.,eTicw.

>~ )o°lo F. coe- piss Po ov!'c.PJ- jt.1. . r+Et,-) k.9►.pavu...1 oa1E"M 4Tz/c.G s7-0,46E86 -

Ftu^1 6q.10 -(og.go 9Py ‘caLko- sTe.4-466e_ sas /%7c9 . inwoL 50LP111DFS IN 76-E I f os7.

FEw s,.,,,l N w~Ly J` 1..I~ÉR~Lr?f.,L~ \ c~,rz/ea srz+..k,E 1/ g„,,, sug // Thy. ti0sr co,-47-9•,.N5 'Mil) -

9s 9g.0/6. FQtf-fnA it*.67-7Z•al 9.b -la •97-7Z.9ô we. S7e,1..1~ ~ ~Z°7c9 . ~ P~cc g),4 71)4566. srerysGges

0y95 6e"-rq sit_tclr-,,ià , 74E ))0S; koclC: C.o ,J31,h4s --e. Po

TiCE,.100JC0 ^, ‘Z°Ttfj. ovEVAl-L j% (NiS+SPo

15-64

9565

9~ 6b

9567

9S-Cog

g5'69

957o

9571

9$7L

9~13

.571-1

%7S'

9457(o

9s77 9s-71'r

9 S79

°~su

58.50

60• S'0

foa.00

63•Sa

65:00

6C~•~o

Woo

69.So

ll.o0

7L•So

111.00

73-,50

77.00

7g-•s-0

do.00

WI . Sd

83.00

r o.so

62.•00

633.5°

65 •o0

66.50

bt~:0o

67•5o

71.00

7Z•513

7~.00

76&-,

77,00

7Fsso

&o•o0

&I .50

83.00

âq.7°

z.oa

1.50

1• ~0

1. So

1.50

I~So

I. S-0

1.5o

I•5-0

1•s0

â .S0

1.s-v

1.50

r.5o

1.So

l.50

1-79

6.19 a,03

O,oL

0112.

0►06

0.25

021

0103

an

0,01 I

0107.

0,01

0801 ,

0,0/

0,01

0101

0101

0,15

0.03

0,01

0,03

0►05

0.16

0•09

002

0.01

C,61

0,01

~,D1

0.01

b,ol :

0101 Or o f_

jr01

0•005

0403

0~00.. 3

0,003

0,003

0.

0•00cf

0,609

0,002

C.00Z

11001

0,001

0.002.

orQOz

0401

Q1001

0.002

Lotsji.r,..~ , C. azq,l.j€21 ‘ P1.9 0. e ir..4 - Tr"_ Po 0•Pabik- -

/qs iw".lE ,

9s Aso v6 .

95 9ry"iE

95 9so-JE

Os ryrzs»(E 19T 8s• 10 9 qTz/cc sreir-iGE2 /57` 33° Tr/ .

9s 9t0./6 • M Epl-} 5~-7`

or ~~ Si vPfr~ !~ goo' 1.1ve~ ~a!9 r C,zC.. 15 BaX,E.S

(Y.) Co (ppm) (g/t)

o. 61

Z•o0

3.00

1 t3°J 1.00

.so

O.42

0.03

b.Ip 0,00

PRIAVORCA IfIEZacUINCEZ LTA, NIC-91-9

DIAMOND DRILL LOG GEOO FG°aC T ~ ~C

AREA: Nita's' L.Refe.

CONTRACTOR: Poe),0E- P En.e T

CORE SIZE: go. CLAIM #: 3So3L5Z PROJECT: NJ)cog, U9

DATE STARTED: eS)o'.1 i9I DATE COMPLETED:zc/o1

LAT: DEP: ELEVATION: DDH #: NIC91-9

BEARING: 1 80° 9z TOTAL LENGTH: 98•2... '. LOGGED BY: G. Lonl&

SHEET: 1 OF 7 INCLINATION AT COLLAR: ---70°

SCALE:

DIP TESTS- q6^rl (05

°

fE1 9~~ 61°

o ~

Au (g/t)

METRES

(m)FROM (m)

ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLE NUMBER

FROM TO (ni) (m)

LENGTH a r4)

Ptppb)

o rENvrv l — coeesr Gizi9r,.iFD G,W,e,e1 n1GA- Mex. Ge,EF'1.1 CoLoQ, rnoTrtF.45 ogrwq OUC 7o Pl~9(orCtb9S CoMPoSrTios: 60-70% Ple,aoGCnJf_./ pLN1,4~ 30-140% P t"7• 91-11e97)de-) re"PaCr-,59 C9v3o419T12&) , tacs~cry

9m111)1801.'7)zFD Sc2Per.rn i~1y• 0N1FJ29LL 1,.1e9tc.t-st M9coiNX-1"► G1 L.Dc611.4 STie0,..36q nevale"-EriC.- r7r„ IFP-9t-.?t17Ja.1 :\f921r5 1-uG9LLY F2o,n 4 lofo isisY.Ing49-TED TO 5fi+1)-rn9sS)JE ,7o rrY9'.55,)\I.E. Svl.F4rtxS$. 501.-P4065 rcc~~~ 9S ,Pei.yt.~ ` r.IET r'~x.ToeE' srer•Jbr.P~ w~~ erfrw.giL)ZED. TIe r4ciP91. S1-V3406S 9eA 1..3 oe.c.E.2 GG DECte.9.5,.Jro 9g~~ • PlPRAUTire; Cd91-coHe-iTr-- t Hex-E.

r-'11Cr-~a5,93Cs,to - is lrce— TIM FrrsE Gc>" rJszt, JEe,stO►1 dg 11-}e PfgovE r1E;INtTto•,l~A vn) IT". '

o c9srkirv

10!0 F.6e.0I55 lô

Feo~

a.11- e.z1 9a9'4o cF eP% ,Po 9T 300709. 9r Z,47 ,q ga.E/uF Pi. Fe.,‘ 3.a° g--1o% J. F-'.6e, o►ss Po •

1_0094,14 F.6e. oKs . Pa ,

Z .ov

3.00

DDH #:Nlcg I-

DIAMOND DRILL LOG

SHEET: 2. OF 7

METRES imOiM

~ ROCK DESCRPTION, STRUCTURE & MINERALIZATION IVIJMBER SAMPLE FROM

(m) To (m)

LENGTH (m)

0.1 1-/•)

N (%)

Co tom; t~7t)

a, (gm (ppb)

Pt Pd (01.

oJek.91.L 1-ad/o F. se.Dass Po . g," 3•oL 9 SMM a.r Zlac- sTrela,ct- r ou d YO9 , Co..,r9u -4.i6 fî 1341:13 oF Pi _

9$31.1 21.50 (o•o0 1-50 0.08 044 0.043 I

g7 Goo 9 rïorited31. Pq CvB+E Icrt-,Z gr fo• 3L 9 z~ .nr.J6eA4u7,41 95'R5-- (o.caa 7.5o 1-So 040 0.05 0.003

sreaowe, 1.100 7c, . red..-.4 %os - 7. ZI * ~~ art/ce, 9r ,, Zp..1e CiWSF.0 8. -FzjcâdP1-30Mt1LTr,.s& (6e0kJ/a corE 7od/o~~

~lr~v~L.` oJFR~.. Vie- ir4 f3L (~.J~31^iS I- ea o►s5 Po T. CP`I f.

I-Z% J.F.6e. M.55 Po Q~~ 9g$6 1-60 9•CC2 L5O 003 0.01 0.002

45 79804E 1587 cf. 00 )n•50 I•5o 0,03 0.0Z 0.002

95. 9gpx.. FOoriN 11.3z- II.70 1Fuu. aF 11cIG$ . oXlpr9'T(0b..) 15 95.ga IO.S© 1L•00 1. $0 0,05 0.04 00.3

Pege,-cr ear 1.10 19PP9e.r."4" DF FoPJ)1f1Tidr4 1 ..9i !DC ŸP1!/+1 9 (r.~.~lrr}geXD o,r FC9L7aeE red iv I I. so- )1.5z 1 S% TC1~

1^tole F. C). 61--t5, Pa a,1F•P,91,1., , RAJ I-L"w1 sor.11a sreirceS 9S8°I IZ•oo 13.5d I. 5'o 0.03 0.09 0.039

0T^- yo6T~,,•

---&-"-'10 ~-G.GL 120.S5 Po,P.f 1-4914-119s70 I3.5o 15.00 )•So 0.13 OA 0.009

L I% bts5 SOt.Ptj,1za . 9S-91 13.00 lb. 50 1•5'0 0.06 0,O5 0.002

a5 9govE 151z 16•s"o ls.00 1•So v.11 0•10 0.003 95 030 `IC

9593 fe.ao 17-So 1.$0 0.07 0.07 0.003

l.ac9u.N1 e% C.coe. &SS Po I9•5o 9 `' l~ 2.J.00 1-SO 0.10 0•07 0.003

Fear,. Z).Z5- 2z•tto z)0% F.ee.GUsS Po • 9P35" Zl.or, 2.2..Sn I-So 0,15 0.21 0.00g

z I-Zio o KS Po L00)14 . 9516 . Lt..sb Zl.00 1. .91 0.06 0.03 0.002.

Loci,4.,1 ' L°In F. Ge.(N)ss Po 9597 Zt1.0o z5•5o 1.5o 0.04 0,02 0.001

: Loci1l,t`( 5% F. Gi2.• O1s5 Po `j5 `;g Zg.Sb Z~•o0 " 1-St) 0.17 0.I1 ' 0.002

Pr Z7.91 f) 5-MM art ,Po Srem,eetz... 97 8o'7-U9 .' rev,' Z$•d4- •13 F) s~et'E•4ri~)~ sEcT~oa Cl~e,flo7:rC ' q; ~ Sod no. ~

ovF„04, 79E >joSr ~xk em-t,-•9i•a5 J-2-10 F. E,t. Glss Pm

9'5.9c1 a-1.°0 a8.517 J •~0 0.17 0.23 0A0 ~.

DDH #:01c`i)-c DIAMOND DRILL LOG

SHEET:3 OF 7

FROM tm)

TO (m1

METRES ROCK DESCRIPTIQN, STRUCTURE & MINERALIZATION SAMPLE

NUMBER FROM (m1

TO tm)

LENGTH (m1

Cu I°/a

N f%1

Co (ppm) ~t)

Au (y/t)

Pt (~b)

Pd (rm.

Fp...0M Z8'._:0- LFS•WO 9 wc9K, FdIJ/311a-i ,,T sO°7vj . Fe0M2.8.50- Z9.so ,Z S'/o NI. F.Ge.n1sS Po.

0•074t.- 1o% F.61;.A4SS Po 1 Or 31.00 9 .3.,,-0-%cP'i a-e•+►acre_. 9i' 1eTdj •

31.31- 31 • 33 sep_4004,1,4 (IED. Pet-l0:0/TE 14- Tc* •

`Iboo

/6o 1

960L

9(133

`iCM,~

9(o05

9.606

am,..

~d

2$•SO

3o.0e

31.ao

IZ'..93

31.00

3;,'.50

3a-7000 .3g•So

-

s8•~

o

30•oo

3t.on

3Z•So

.)*Qo

35150

3.7.00

~1o.oq

+il•S7

I.SD

I.ov

1.50

I,4.

-sa

1.50

I.5.0

I•50

(

1.~~ '

I.~O0

020

0.1.17

0.10

p,16

0•08

0.

0.13

O.Ij ~

~

0.1g

0.30

0.06

(?.20

0,06'.

0.28

OS

~ O.Zo

~

.0,003

OtOoOt{

0'°c)6

,D,qai

0.0,07

0,00

0.00~

choo9

0,00s.r..I.sF,~l

9r 3z;.4, ,.9 3^,-,.." (5crdce sroi.•tot;e. CFi,slrii.4u,•1& r,t•*'t1cP7ll1x9. MiE )iosT' tr0.sY3+NS G 1% 4lYt Po .

9r 32.400 9 '1.fl 1,►. P.I .vtpsicoa $vPTcJj. Fe.anf-N3$.oy-33.1G Nog,

1?-4c4) J- TO . FP.°~^ 32..00- 52.To lo%o F. fo2.dtS5 Po -

FEvM 33:13- 3t-I .17 P1-96 e1cj to/46 ,L7-5 6010 o44.1i...1E Xt.S ,g,,../A 1•90 ITS -*E. ir,•5724(,- Texi.z. ^- 13o°7Ce .

F P-4"1 3,,.i • 26- MAI 1 9S ~‘1E ~ 9T 43°-ro, /9‘•)(1. Ca,.r,',9iN1~16 t 1% i~ .. Pe,.. Coa3TiC7s w t}OsT 'tack .9~ ~TIc+~L . eoM 3q.~-- M •76 95 .,~gc•~E x 9r L5° 7G9 • k, Mi ~+oe. Po ,

Fe.om 35.o0-- 1S.37 9s 98044 tsor wtrM nlo P2EFFE6!i aeaFi•6"971oh11 5,36 4.- 110 wsS P°.

FaM 35•S'7- 3S%0 CLTY. sre.4.4Y,zt.2 ia 09.sgeoiG 1nlcWsictnfS 6-Ts5°7t9• 97 3S:r.o7 9 ZvY.^ o7Z s7PigsiCoft• or 5s-°TC1j w Mr^ayE_C?l . 1Ps7" Co.4Ti9t.J5 1-zd40 J. F. r°e. A 1ss P, dve.e.$1.1„,

Feo+y‘ 3-7.Zo- 37.SF'S Pt~,toG1xE F~.» w Mi ~W927L a,~~. -T~,s ~,~~ ils ',NJ G.,~ r~o~ --- Lis°70, .

T115 SEc11o,-J c0,43'.9,.Js geEr.cla F¢9Gr1gv7 s6 Feor1 37•- 3R.413

I

S- lelo F. Gt.Dt5s P©

ov

~L 1-Z% F.~e.n~ss Po 1 FPoM. 39.6~ - 39•96 ,9 sr2o~iC~`, GAje/Son3ejTl Z,fJj S/"o:71cm.1 w FEt.J cc_ Ft►-1.EA 41021_,,.1E F~c~ Tut;F1,

Rp)J4oML r dp1ErJTF,f,._

P~ j~ + = P ~,, b8 ovewtt_ Z S°la •F. e.~ o. ~ . 97' 63' Tv". gr-. =%•s5 9 z.r.,.-. sre...iC,a: OF Poi Pi gi' 31 °7o .

-I' 41.09 9 s-pf1r", -' jowl STQ t,nI6ge oF iPo > Ip4". Pan fyJ 3g ° 703.. Feonn HI•45-yl•q8 9 Pc?Py> P•, sre.,kqeze• or SZ.°1-C4 -

DDH #:'Ic9I

DIAMOND DRILL LOG

SHEET: j OF 7

METRES

(m1OM J To l

TiON, STAUCTURE & MINER- ROCK DFSCF~~ R SAMPLE ~ ER FROM to

TO (m)

LENGTH, (m)

Cu (%

14 (°/~

Co km)1 km) ~t)

Au to/t)

Pt (ppb)

Pd (PP

.

. ..

. .

. . ;

Feoev‘ 111.8Z.- 91. 97_ , Sfxl'6471JI refs Peel AuT,Tc- a ICC? w~/ "' 1~ 09

9610

9611

9('01L

°I(0)3

901`f

g(o Is

q(nIL. ' a.~ ..r

96i7

9biff

9011

91.50

43.o0

yq•S°

1.15.83

`I6.65-

ys.op

q9•50

I•CI_n -'"'ca

sZ.So

-94.00

S$.00

J-1.3. op

4,4.5o

45.83

146.65

yS.00

s19.S*0

$I.00

~ ~~.+-~

5`. 00

-..9X5•0o

57.00

1. 50

I•50

I.33

o.gZ.

1.35

1.50

1.5o

I _ ~~

1.50

).go

Z•OD

0.13

0.24

0.14

0.338

043

0.31

o.34

!i ~: la

mis

9►06

046

0.28

0,36

0,2y

1.05

0.57

0.114

018

~ ~ ~f n ►LV

0,10

0,i.6

i. Z9

0.0oH

0.011

O,COâ

042-

0412

0.016

0.o12.

.► __. UeUt76

0,003

Ü~~

0,00

7PJ~,,.14 op 30°-1-cf,. OJF.r~jld, _4.00 v,F 6G• ois.. Po

pe.„.h N3.35, y3.39 S.C~,PoJ77n.,I7.E+D .PrzAo.07( &II<E ? 97 ^' go drop.

"Jr 1-1•92- fl 3MM C.C. STQ.1..1erez„ ,9T S9 a Tcl - )iaST e.ocx

Co..11f))r►s t Z% F• (od;.AISS Po o✓F.P13u--•

LJlt.s-.o -45•zo z.. Z,d/o F.-M. E,e. 645.s Pa F,eoM yS.Zo- i5•gZ /H 1

...e.Pt;.Jr,.l1z~ Kt-laoil1'E 1>IKE/ 51Li" . u.c. g; ^,6Sa-rc*. )

L.C. tefX N+. 6P/jOdT1o,J9L•

10- 2.010 ..)ET7ExTuerroo. Pa }C P1 (cel 1Sz-S`Y.o ox 727,,t_ svc-P,j41ag

1-0 ri)u..,1

?; z% F.Ge.als P° ovve,9t.t,,. 1-17.71- L7.9t./ fvN9ssiv.E. Po.P.1>cP1 5Ti1;1,46E4. 8,.la oo}i ls,b-y 7et'~OwNltâ 390 -rte-

Lik.19- ysl.s- rillzJVE P° ,Ph gc.Fj3s /3,4a tal}IsAs , wiTs-j No Peterterez. o?.le...Tji la►.l . 97 qt•3o 9 1,-,-, CPy STer.aGze. 9i 3g° TcfJ , ren rn I-18.31- Lig• 50 LS 7o -MSS - s(fn l -,7-19ssi \/E Po 1 1,p, w Te. CPI J ;J izy I,J (° 9,4 ... -rez"iA _ oP s-Z° Tv). Or 98.(cZ 9 Ic,...-.• g3„ IQ oF •-•• 2•0"/0 piIss Po N P.,‘ (7-1 fvv9,..sIVE gl Eg5 Or 14î ° Tc4 e rys LIS•-ra 9 5.n.•-, Po ? Pn> C1'i S,)a,.7loF,e

Po P,., 5re,1.~E~ C2~ ~r °T 9r 60 ° -MO , 95-- Li g. gZ -.9 , ~ oy,

ar 49. oz- 9 5••t-ter) Po ~ P~ siP.1.J(oC,~ 1 (~ f ° Ted).

>sS-lo"/o bl5s Po w M1,,ioe_ te

! ~,` . ~ ~ , J

F (` 5-14 olss ~o ~ /g1 ~l-i7 ~9 2-1oMr, Po>P~ sT~^d~ 1..7c1j . 9-r sz.-yI g I cn•, coz/c.c._ sre,,Jefk or 5t°rc-9.

1.ocsylt-4 ?:- 5°!° 6tss Po - 9,- sz.s-s- 0 Z.,,,.,, P° P• +►~ ~ CS

i sr~Jt~? N~d

.T~ ~ . .. . . . ..

G I To 0Ils5 Po aAladyr-4_ . ,yr 511.I9 /9 sn,„yt Po s,rer,a0c.o ,9Tser

ovepiA .?•i ad% F.Gt • rJET TF.xTveJF2N Po > CPy • or 512.619 1tv-i-n ho> P1 5: e.,...1 fot:a_,, 2,s-°7c.9 . .

DIAMOND DRILL LOG DDH #:Nlcgl-~ SHEET:50F7

METRES (mpM ; p ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLE SAMPLE FROM

(m) TO (m)

LENGTH (m)

Q, P/.1

N P/.)

Co WO

q~ (g/t)

Au (g/t)

Pt (opb)

P~ (pr

Loc,14-1 v io % n1e7 TEATIZZA Po . 07 S7.'10 j sM•Nl ,Art-kr-- 9-b^J(ac96?A

67 31° 70 ‘ co ,rri►-►.i Po ,Pi , /97 57.69 ,9 Z-5,,,+,.,, Po,. Pnki p srR.),-.16~•~ 97 18°Tc1j. ,9T .3s- .01 9 1c,.-^ ivv,sSIsig P°sPi d gTp,,.,~ ,.-I- To . Fea~ sa. icy- 5 fs. a., 9 8,,,-vo oF -b•-• io ° piss. Fb 9r l rs° Tc9•

57,00 Sg-.sa I.5O 0.06 0•50 005-

Fec,si 59634- $`6.`4 ( 9 c~1.-rZ ldc srei,JGEz... (7.7- .h0ssivc Po i Pyrh 9ei2,1 51-.So foo.00 1.50 0,03 0.46 0.013 9; yoe 7c9 • • svut4par..s I.009LI-`J. 9r roo•97 9 I vw... art/ac. STP.J•.r6r~ f3r 46?-2' 6° ":3° 61•5o I•So p,0r 0,85 0.002

Zs"' -TO •

Te. su,.-P130,ss. L.oc9u-ÿ. 9r 61•713 g Smin ŒrZ- sTPa../u.L w Po iPy 1 cj6Z.3 61•5o (03.00 1.So 0106 6,10 o.001

9r' 330 7ce- 1.5 -6t1.0o rlic,e.u09g6t'o 96Zq 63.00 .ÿ0 1.50 010$ 0,07 0•003 U.0 . 2.01-jT,:,l,EL s .W- . -. Or

TO

L..c. 11 '1 9,.1a SO3i/ 7"Cfj. - .

►iasT f=vCJC. Co100114S L 1% WS Po L.d c1j11-i,

Te- SUL.Pd1A&.S i.CIGN-14 962,5 0150 6SSo 1.00 0.02 0.01 0.001

nF,~~,~M 4'6-'7°-"...CaSliaLiF/E6 t a;10-2u% L° .foG. Pa) 1)46 Ml~

v T • 96?'‘ 65'S.0 (o6•~C1 I.Oo 0.31 0.51 0.011

F6t4 cc F,u.ep 4.91e.11aE Fa9aveke& w ,91.rEz9r,0,4 4-11")s o g6Z.7 66.50 68.00 (.So 0.0.1 0.06 0.003 No Pe~~ oe,~rin~-

ge. 06- 6 .44 NI iceo raAg6eo qetzs b8-cxo 69.60 1'5° 006 0,01 0.00q U.C.sili9pPq- 15 0759 I., c• sijqeP,gi 35° 3-c,9• 6Ei- So- 6i.00 arriP1j-igo,,:T'..~.c~ % ' 3.9.9.4:q 5.1l,çee,..fA gg°T.C.n_ s

~

68.k1- 6e• 83 ,9 M ►iK.`1 a6/Z. 5T8k)beg 6T gv°1-c9 -

1.1)0541.-y > ef/t9 oKs Po ~P.1.

.-‘1.511-69.% 6 /'7,LbC`' art sTei .11x.,2_ w M•9F►c j^1u-•h•o..(s ."46 . 96z1 0.50 11.00 1.57) 0•09 0.09' 0VC3 G 1°% Po? Pl ‘ eT 53° 709.• 000394.r 1.6n oils Pu Lot,,Gi-1.

F¢o" Ta• oli - 7a • ,lo .... zo +. o1s3 9',• 1E.T 7Exveza P0 w ri ►•,,oe CP i

1630 • 1140 7a.50 1.50 0.09 0.19 O.004 .

Feo.n 7a,66.- 7t.6g. 9 acrz stab,, act_ /Yr. 3z' 7d9 gr-it, c,d,.,T9,..1wG 9631 ' -12.-Su 13.61 141 0• i) 0.10 0.003 5)10 6Iss 1°-1 d- 5-% 6,SS C.PY. 7}}£ 4asT ,2oraC. '~9 Cd,a,u•15 G 2°)» F.. ~-NQ • .Ia1SS Pn r1. uC,DiYLi :.

, : >

DDH #:Nic iI-ci DIAMOND DRILL LOG

SHEET: OF

METRES FROM ( O ROCK DESCRPTION, STRUCTURE & MNVERALIZATION SAMPLE

NUMBER FROM (m)

TO (m)

LENGTH (m)

Cu N riot, riot, (pi )

Co (~t)

Au (gip (ppb)

Pt Pd. (tlr

13.61- R(o • i-7 ri) icPpCO~-Ct

'

t9.c. s+92P fjT Z6° 7c -

i-rG• o ~,`

W, ~~jaL -7#6 J~/a1 ~~M/ uDh,P~~ ~ü dQ~ 9,JD 44-614p f3`f

. . CfjFgo~9TJE ,,,-.1.A`n.. vl coea, ,

aJw,nvr.ovs CC FalLFCS 1191 pa.a..►E F lie.E<S 3 116-Joi..)6 84 3b-Ljs-Q74,. 163Z l3.6Î 75.00 1•SI . 0.04 0.0S- 0.00g

J9r. 74• 3S j Ic.v." GC. x- Po .MrJ(a.1re or- bv' Tc, eeossc+rr- Sl +9 Rj ,P0 5T-twoe.e. or 40° 7v9 •

,9T 7~•37 ~ c~L~cc s~u,..iCa~e w w~s ~ ,~ s7°-r~ . ~r7~.b1 g633 ~•o0 76.50 l' 5° 0.0ar 0.04 0.003

H 2,-10rvh 6L L f cC srRavJ&ce o"--) 8t_i$S oP Pi 9T' 3&'07-0 , 1

F60J cC.F ►LlfcN, rj+914reur.iC rel)c-WaS Te_,Ja.iNto •+3/4 a•}o-bo'3To9• 1631-1 7b.5o 78.00 FS-0 0.05 0•08 0,00({ 97 77.3z .9 3.-n,..1 Ga-z,/cc 53-6..16c2 C.of.►T9,,./r,JCo M.9$siVE. Py

ô)-F$S , -rez++]QS 4-16° Tcl9 .

FE4a cc Fit.I.Ea FR,yeTuer-S - 6/a 79.3o- -19,5-0 ;(MgE Fe9auef6 °Ie.3S 'moo 79.50 I. 0•N6 0.07 0,003 -7P-F.,).0 ,... 47 ° 7 e~j 1 w e,,.ji. s w... 1-1t) ,./C #9r 8 o° 7e9 •

Fe.aM 7i•~-'g - 80•7S c•Gr~. ~eo _ ~ `jro3~J -71,0 :50•75 PS- 0.03 OaC2 Q.00Z 0.z. 5r},4¢P,oEr,../aD 8 ,1 9 GUT-5TWJ(oF.e.,fj7 Zo, 709 , 1-..c. ~ 'T-.32.,° rG9 . 1-nc,9N.4 L °fo Pa 11'4 7415. 5eGT104 I 11z5 ,

963-7 $o•-TS $Z.5° 05 QO(n 0.05. 0.003 . 1.44)/n6eouS litiira.a>Jg, FRhave.es ez. FrL.s.Fi~ 04,.041,-)14 cyea&irr.6 ) reKi 9eE. s,.'slJ T09. '

QT Sz.619 i.ÿ vw. BEj.Jo dP Py (sent-019ssi.1E\ 97- Z7°7c9. 1638 1s4..5u i<3•5.0 I- d.¢7 0.22 0.0i$ ,,Ju.nkt~ws cc. Ac.t.Eo fer.,-.-t F,e9cTil.ees or- 3L° Tc.9 ,

re 5vi.P4I9eS ~ Ffj,..►r Fe~~rver•~C~ - ` 9o3l li3ao $6".00 1.5-0 045' 0.0t( 0,00S*

t's 9.50)S • 9bqa . .00 8.4-17 1.17 p.t5 0.06 /9,e

DDH

DIAMOND DRILL LOG

SHEET:7 0F 7

. METRES

FROM (m)

TO (m)

ROCK DESCRPTIGN, STRUCTURE & MAJERAUZATION SAMPLE NumBEp

t FROM (m)

TO (m)

LENGTH (m)

CO (%)

N P/.1

Co (vpm) (g7t)

Au (9/t)

Pt (ppb)

Pd Ip

(0.1-T - modo- ce . (ot.: (0,4+3A20 •

90 ti(

9(AL

9bLi3

96,eti

WiS.-

c(01.17

96Lig

l6 41 '

LvMul..e/T,E ~ N ST i dP.z ' 1>oMs,400T6 11) )5. 5eC1-C.71d/4 aF i~

Sfo • 17

5-7.37

89. 04A

90.5°

91.7`i

92.5o

9+00

9S-.5-0

I

g7 , uo

I

&7ç3 /

g.a0

90.*)

91.711

92.57

gÿ ,00

9S•50

97.00

9â.~ Q

I• to

I.6

I.S°

zii

d•7k7

I•50

I•5o

1.50

1.12-

0.57

0,07

0.06

049

0,21

0.01

0.06

0.13

V OA

332

N0

aSi6

(?,vLl

0,56

O•Oi

0122

0132

v~~4

0.67

0,004

0.003

0,003

0 105

0e02

0.005

21.006

O~Qd~

. ~ .I

)9 ZvrJr cF' Svo i-rir,1.4s 1.1E. To rlosswï= Sut..Pd11*5 . 1-0) C.91..

Po> Py > P►1 . -111-Ezo.,)y ,f ~~ ~ ~ OE-t-~•Jf~ ~ fi.lf~ w Plui 5r~nt

,.

VPPr,~ Co^MjvT 9T 2-3° TGj ) /No g- 41sTi..IGT Lcnr~c.E=. Co,•J7"9cT /0- a2.,o .-7r9 •

FEE"; sF_c,T)oA.K oF Z%o mss Pa \ Te6.)6sr76 ^' 45° TO .

a.iCt,yt.l. 'rt. sOLrrl•wEs tgr 89.5°I 9 Srvn C(, sJe1+~,2. +irZo-rc9. ~,3 10. ZS = `1 d, L!'o Gee/OA/11 Co?.E ` $o % aE Cova4°

97 9n.5-5- 914^'11r, cc s)14..1ec-e.. q, Zo ° Tc-9. L 00 Po ,,J +1051 t l.d0,b4 -

Fur,' 90.7q- 9è•«, 9 rneNâ,--YLa?fJ1 ro..>r 70.4lJA1.4(j^°*°T09. 11.8B-- 91,7tr> ..vas5toe pa (77 PI 9r..1a CPI s&-xuo,JS t ,..,174,•.)

-Ïi i5 s~f.GTiD•J occvks 4 3. 5 cr,.-, 2 PI (~uSE .

~i ~~1D£5 OdE~ql.L, . ,9611(0

I-Zgo a1.5 Po jP,i t.ac914.4 , PEw 1•nM cc sr1;i,JoGS gr 1073 Csue 1/~

96.6-- 90.8I 9 axe /cc '`FLocp.a." LoNJE or •.., .•i7 °7t')

t,`pn9T91NIn]% M9SS.) v6 PO • Pre 9,46 CP.y • ,

~M 97.11-1T:0 1 ~0 11F 57-1o°11 f. F 6e . 1~is5 to 9r ... `ibo 7o9.. 5'lo c. oe. Po , P'y Locge.l-4 w)ri fo TIti S","lPI•e ti,t?F.esJq L.

rit•3-1,,an I EQFj -

I 7 goxfs oF Ccyc.. STveEIN tt..) kW/1J e•10en169 Qc

$

,

-

GY llNORCA REZOÛRCEZ 1L,flUo NIC-91-10

DIAMOND DRILL LOG GE©Pba© û üû ©

AREA: nlicogi j..9kL

CONTRACTOR: Fo— g€,Qolr CORE SIZE: eA CLAIM #: s5o3a2 PROJECT: !J)CogI i-13 ICE

DATE STARTED: z~ /pI /91 DATE COMPLETED: Z6/0,1 hi

LAT: DEP: ELEVATION: DDH #: N 1c91-10

BEARING: I go°9Z TOTAL LENGTH: LOGGED BY: G. ►-ohl&

SHEET: OF (o.

INCLINATION AT COLLAR: -5b°

SCALE:

DIP TESTS

o o

~

o .~

METRES ROM

) ((ml ROCK DESCRPTION, STRUCTURE & MORALIZATION f RJ(v BÉR

FROM (ml

LENGTH P ol

Co (PPm) (g/t) (g/t)~

PtPPb)

D

•6b

70 ,0

C.195l,JG

►N1rEZ.r1ECS►9TG- riqF1c. .

Fl ,JF - Co9e s6 Ged9/.16/ G96geo .

t.o.l~. 1yZ•gi,,r,

WYr..P1nEJN Sgfr -- r`r)9PIG r-IF...r'i9vOLr,q.1PcS

B/n/ $.o0- f2,00.n Dicce5 511-1_5 oF 1:4.9& l2.Ic1)

~

CYo -6vd a ~M So - 100 ~ !n) w+67~ Tef_~1r1 ~~-~o

G9~PA FE~J'GTId~,/S aP Tie )7~ T ~ PP ' ^ ~~• PPE/94.. C)~ )-cc.►7"1 ~f1~ •,

F2nK1 2.6. 2.0 — 2,64 88 /v.)06E;e4761-1 s)i4e6.0 /3rw~),.Oee." Pc.g$ PeesvT ~ TPE07 -- i-i5 °7-e,g.

Il

l

DIAMOND DRILL LOG

SAMPLE NUMBER

FROM METRES TO (m) ((m)

LENGTH~ a (m) 1%) ROCK DESCRPTIOR STRUCTURE & MINERAUZATION ~ .)

9r 27• It { wI19T 9 PPEi9rm. To gE PtlLot.-35• 74E Sf.LJ~ 1S piSil.SC.r Sii69erd) FiT 3ca°7r4,

9r Z7.S 7 9 GWiTE 5T0-4^36Eie fil' 30° TG9 .

Feorn 2.q. 3a - Z°( •So H C)%84"1,9T1T,F6 T.o,.tE 72Fi40,..16 6-toIC5 u tcE ~9 5ïett7ü4.ü PIu.vJ t 6Ec94.6E oF /j >rNerAS pry jFjc. ~~ ~ E.1~ 800401..16 11)4= C/9ebow jT'IT.Ft. SE;~.ri oNi 15°70y. TQ- Eu+;Etika1,.. P/?F~ .

gr 32•ooM /9 PllUyw IT's 7c19 7i}G 5e/A/9(0E /1 ~,../ sog// 709.

01/40,94, 74) 15 •‘ urJ,T rr i5 9-"i Pt},Boi_) /IDEA 19..io ri- C • Geed `ed

FeoN1 35•55- SS.s fo fj•.► GQJ91413-E- STC,•J6 fgS ,9T zS°9•vo 35°Tc.91 ?ESPf cT,vF~~,

Fie.oM 3778 - 3V• .24 9 s469e0..13 .9144 cl3eBo4onvet, 175 !i9s51vE P1 jC, P9rc+~Es CoM73.•^U4% MImte,_, IG z139ES T~ËI.IO,"IG 3o°TG9,

Fe/PM 37- 31•••)13 Gew.40 Coe,E. 7o-&o% laEroVFA4.

Few1 M 37.23- 3'7•RS 6t~j~ijB ' 4)kE 9f H5°T~.9 ~ wt~'c~ P9~r.l.îl.S i7~E 916r•. OIQif'~C.Ti oeJ •

• ., ..

97 39•50 ► 54Ey9a,Cd 15°109-

gT 44.70 ,n,1

siiç~j~p // Tc~ ~ w 7))E,~os,~ o>✓ ~ FEW 6,119u.Fo4Lps PP.ESEr.~T . T►}E 4o9T Is r9MP440LIT1 ZFii).

43-00M siiffiaA

9T 145.00",‘ li 16001

~ i-k%•coM

FC0,r1 117.00 — 119.11 Genvr.lo CoGE o% GE(mIe2Y.

>zfI 41.c°..1 rf 1644 St;o9tral& IS'Tc9 t_crosaf Fotb~.d>

qï 114•5OM 1)IGtri0sFi~.Fb w -1104T /J-ro9.

DDH #: n►lcgl -, DIAMOND DRILL LOG

SHEET:3 OF e>

FRMETRESM

TRE

(m) o (m)

ROCK DESCRPTION, STRUCTURE & NNNERALIZATION NUMBER ~~ ~ LENGTH a

p or Wpm) (g71) (~I) Pt

in

_. . . .

or s-1.00,1 0004 sa)g..9alt. 9r al m Tc9 .

Feoin sz.TS- $ l, z I 1 ~' )0 _,50/0 L w1Ÿ I7E (~ALOQ,~ , !~C>^~1~TS

de. 9+^oyc~ULES •TIÎ9r F}9,1é gel,...) 6L-0,4ta9TED f/ Ta 7r]F 3469e, 9T$°709, 1.0 Ff oS7 13 •!Ee4 mga,G Oa.. o9ex. GeEF.+../ -- eLixKCoLI7P,, fJniCi FiniC

. aT bg". R q > ,........ . .M•I k ./ f1-7-`. rTi. • v.:Co O:-- -,w°Tia .;

, .

GPlj/rJrGp .

,9T -5-11.?", -lc FtncJ C: G11911,#3(t.i t4f1^K~%S gevM /J 00Q3C-etfc.6,/ F. 6e- TFxTve.€ 'fo +9 1,46ÿf otf. Fi.l Fa4E1 G-,a9ir4FA iEiir+,92& !3y 311. bo..

55.510- 56•i1 Ca,9eSE yok/Er. F,140 (?) U•C.. DIST/..IcT 9J'So Iv, , L.• Ca CISTOCT 91 55° Tci •

17/I5 u•U17 IS MED- e.6.e9afr-iEp , LIPd/%r-i+'>fO. Geezr.i /..! Cape C/rJDEFne~~ 1 gMP1}1(ZpLIr1ûQ~ 9rlo ÇoniT~-~/..IS t ° ~ I lm blss. ftrix. P.,Cc2:15749tatl•D PI .

revM 5Co•3f2- 36•g9' fj CC 65<,►o edi.13-91.4wG 9CI wL9e- ocrJ.JE w-S , 3-3-01,.-, Lor.76 . 9s wEc.I_ 9s rh1•.me_ Pl . ïizEro : z3 °Tc9 .

5b•?7- 62•03 rV4FIc Fww C2'N) t7:2 NSNowFI.91C,E r 7fx.TdR,E 9 019e)c Ge-er" - 81.90c. u•.nr w t-3-1,^ SPo7s oF aF11`)11TE P1s~G . IZ.656n8t/.JCy `s,lawFt91GEh' CoMAIïI5/..1et ' Li" vF 7K ?orgL, CbMP,iIJ1p•.l • t1.e. ptsTi^KfiaT 55°7«i 4 C.Sihe.P 6r L$'709•

FC°M S9.Io- S9• 3S F. Ge. MfjFIC olk,E/S)IL AST: OA- 1$°Tc,` L•C.to°7c9 .

FtoM QV. LiZ— (on.i3 n e• ,i .~ 97 : v.C. 27°T091 )-,.c.63- y51-

fp2.0- 7000 1Np~T-~

M~

/9F,G FL-00 (` FL-00

1'0- pgP~62EFj%.1- 6Lf1~. F/nIC GrA,NCI fioU9T11> ' 3o° Tty •

9r 63.8S 9 h- 3^^M eiz• sYva.-J(oKe. 6;5 9,.► 9ace977O4 4914 Fat. Se-,M of.) Eire sox C.e4T1,,4/4b NZ . Pi . Tez.1p 6 o TO .

634 6.1.01 /j 8ut,.1- au- van) Or -11°Ti•J9 .

FI~n+~l 6~.5`~ ~ 01.1. 61-694b0 146411- -Mks Is ~wsf~l 9 eFsu,.T- of

• ea-371%T cv ~ ~C9S~oIc blk~/~N.L .~,Kr gE1.~uJ T1~~3 u.~:;. toaE 7t.û.1is5 ^' Ha- +i5°729 .

64:71-- 44). 10 69ste-olc- slw/oI+(E u.C. eZc.9T14/4- S e.P /j L8° T17) -

L.c. " 1 I,

9f '"37°Tc0 •

DIAMOND DRILL LOG DDH #: yl-10

SHEET: i OF 6

METRES -ROp~

I

) ~ ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLE

NI~EFi

FROM On)

10 or)

LENGTH to em t%)

QI N Co taur~

A~ (g/11

Au (gin (ppb)

Pt Pd' , tncd

-->

FeoN) 6B •oo - 6843â ,9 6e9,•1iTlc DIK4.• • UM • 9r 37°7c9 1. 1...C.,9r 7°769 (s.B//~Tc9 °

99-1- 63 • St) tôtov../D C.c~ DoC Tv 9 S►i+~ ro,./6, C~o I ° P.~-Co~/EG~~

/IT 6y .00 rwp- s7éo Si}E1,01.1(0 9i 35° 1-09

io.qq- `11°- C9' rd1761,- CaoSesE E.12.."-,.4FIN Gg3&e_o

96~v

• %51

96S2..

8'7.& ~

91~ a~

103•a,

~i g!• o

gt• 5o

loti.so

1-56

1~b

I. 50

I-5-0

. D o5

0.05

0.05

. 0 02

0,02

0.03

0403

0033

0r003

--'•

9 DISTinar.7,6.e*A9?Ia•.1P,If-- Co..ITOc.r IT 28 °T09 '

wE91c- Mcpce,yrej..1 5,4(.9p-i.D ... I{o°TCtj ,.369e. T;-at: cr..».n-ocr.

9T --g,.ocy,-, 1,069K Fau9Tio.J or ^' .i6° To3 • )

16•78- 78,0o C • 6e. PteG. Q.Ic.o) to•JE ,J.C, ,s 4- 709 ,* E••Io oF Th-e To•./f 7PF,.nictS 3o6 Tc9 • 14F Co•.trsp7s .91).E GC43.69T10/4754_ • CvP.1 0l/3rit 7~cr✓P.£ IS Pt-E.A:rp..113•.ir n., 7-45. I.107. ,93.. o...f.►.L ,9&-71fi~ Pllj6 P.icJ} X.ov.lE i "M. PI oJEe,q ..i,„ , --

81.68-8Z•oS' 9 Currluw991, T>àcrLea , P!9C9 AK") Zor./E 175 -PM. v.C.

Ge90/974a49L Or 5t.°T~1~. 1 74e 1-.C.- IS ► io..lg,, ~ 53°T0 T. P•I 1,.1 -rifts Zr-h/1 .

FsL. so - gZTo Z,o,.a6 9S 91344e. B✓T. 1/ Tu9 .

Pea's') tsfs,aZ— ts-ts. ag 9 RTL vv.) ~ a i(o T

>~ r~ G c9 T~ t..•c. IS v4(a9u z~

~ls

l~r.la

~jr4£ I~o5r P.uuç ` w Z/o I-~ F.GQ.L1tSS Py w Te. CP`~.

~~pJJ1 rICSTe,oriC CO/.iTfjlA,S 1-2..°,6 IC.Cot. 615$ Pyc

L.0v91.1..-1 Z% F 'GP-- Pi • aJasr'kact. Is /y G.64.•. tympdigouT2e.6 6asgect.

lc. 60- I05%18' 1llcao6964gQ

U•C • &429D9t,o n19. eur 41 srJci- 9f 19' TcA • 1....C.. N/r.el P91,47. ‘ IT Hn* M9, ir /q.&3 g $,nfrs Gm sTCJh1(oa. Cd•.m9/n11niG m,Nloe. 015s Pi g 1 ë'3l° lb) Te o1s5 yur.pF) st,E5 1.4 r,i15 vr.,rT.

FerIM l°ÿ .00- 104 .5.0 L'/o en- C Ge... p w Te A3 -

DDH :NtC91-I

DIAMOND DRILL LOG

SHEET: 5 OF (,-

Im~M I

AAETRI`S ROCK DESCRPTION. STRIJCTIJRE & Mt~RAUZATION

ITm

SAMPLE! i~°"" (û LENGTH Cu

P,f (~rn) Ig~t) Pt Au

(g/t) Pd (IN

_._.> fo5. Ig- 11-12,1q • 14-1FI \wM- Co

153

` 9~y

9655 5'

965fo

9657

9b5g

9651~

966o

966I

966L

96G3

,664

104.50

1oG.00

1o7/$o

109.00

IIo.So

IIZ•Cn

113.5o

moo

I16.56

118•00

119.50.

IZ►.eo

106.00

►o~~o

l09.0o

110.5o

Ilt.00

111.50

11$•00

116.5b

flg•vo

119•5o

IzJ•00

In.So

1. 50

~ .50

1450

1. $o

I•5a

I.Scx

1.s0

I.50

1•S0

1,s-o

1.50

0.06

0.20

0,20

0.05

0.19

0►0g .

6.08

0.13

0,1 g

0.20

0114

I•5o 0,000°s4

o,03

0.19

042.

0,03

0.35

0100 '

I ~` ,12'

MG

09„ 0'

0,30

0.20

010 ~

am

0407

0,00t,

~ 0003

O• MO

0,Q01

O.GISS

0,007

0.00$

0.077

~ 0,00.5

,

1

,. v.e. JF,.ei F91,.rT riT qo' •rcg.

gT 10,1.6g 9 -5,,,-5,,,,,,)^'► CRHrx•riTlTi Zo..rE Co~r9r... .~K' 1% P)l 3 #57- a2+° ;ctj . re.o ,, tFl - CAec~.)9TIz•t"o ro-J6 - I0• la 9 stwc~A ,, IUg.gLi~} C0.1777J.41.40 'le; 1 °/o C.4041 ea 1céo Po , 7-e. Pi J 93- 4-16° Te6. FeoM )O. 18- 106, o o~ rlfE 696~e.o Ccinrss9i^ls I% 1::•r is .• LoC9L-q .

soc.P~ie-5-10 Dls.ci ES ~oc9tL4. CP`f > Po } P Z- ~

Z-$% F.6P. aiss eel g1,4 IoFs.2.5- 1vsr.50 . 1-2,1) F. Cae._ isms p.0

o.x.xgL.L. .

t~c,9tL~ z°/TpiSS

~O ~ rY3ooT trPY • FEr..o CC FIL~ r•J9,eu,.t£

e,9`3'vt~~ e(ri.)O► Co "' ° G9 •

? L°/a ,p--/y) Coe, e)ss Po w Te C?q oJEP-94.1- _.

...2°/10 F• cot. DISS P%) W -rk 0'4 t-ovP-L4• n1UrneeraJS r.C. JC14.E0 %Po

I19, eu..lE Feqr-TvPFs 91- I O° -rr.9 C Su3 //)

5/jr~E 9s 9Br0~1~ .

pvFPly[.L Z-`j ®/o ass P6> Py> CPI ) 9r 115• Izl / 3-5Mri 1'O>•Pn >MO s1b.lr,,F,e or z ) . 7"~. FevM I I5 • 9 - Ili". 97 fl art sr?~..~loE.e_ w 1"1. O.GG. Poi t°y 91 3cI° TO '

Fed," 11C0•63-- 116 ,77 il C41.0tt7► tF.p XC.140i-iTd (0/ Wks: C.o,.rT91•4/,.I& ÿ% J. F.Gt?. OP1? Po 84A TP~~.Ihr~Cn ^' $3°TC~ .

'Mt I~ o sT Co,.rT9.~/S ~i Z°Jo ~►ss Po w 7t. CPI L.arl~N.`r

9r I 11.11a 9 I 0,. gticis aF P° . P.., ^- ïn' 749 .

ovE.~~~.5"!o IC. G~. t)~S Po w "II iso~ C,P~, •p~ FR...-,M IIt.°{ 119.21

sEeeE.,4r3arr.Fn ristocrr>g• -rt:.C..10..I0 --1 y5°~.

LpCIi-1 :Z°/n OM Po w Mü.3c,t cP~ , ;

1..605.a.4 ?t% OISS Pb w ri ►doe- c!'

DDH #:1,11c9) -- lc'

DIAMOND DRILL LOG

SHEET: 6 OF (o

METRES FROM

~ ROCK DESCRPTION, STRUCTURE & MINERALIZATION Nl1IVlBER

SAtv1PLE FF(OM (nil

TO On)

LENGTH to

Cu ma

N r/.1

Co fpvm) (~7t1

~

Au (WO tppn)

Pt -

Pd Inca

.

o1 / 41r.R4t.L -4 5"/0 F.(4-- DtsS CP y w 1-2,10 P-a&•CISS Po tocNy1.

seePE"ifi-t( ut> , Te, sour}raF,s •

os 13vo.lE

95 F3NIF . . os ggo•/~.

reon I30.1p- 130.50 > loll° F•GG.tsiss Po w C.Pyw' 61..7-

Te.E.io op 3s- °Tc.,9 . Feo,.1 13o.So- I31•3-o 1-06,1-1-1 Io% F.(e.. D1sS Po wcpl . SfLPCNiTr•Jr MI .

`~ ~ / 1.oG+3tI, 5-101/4 DI33 P o w Mr,Joe Cs , r~oy-~p sl s~ePE,.~~ ~,~,tEn

~

&9g620 .

05 Ij.sd.g. guT' I-L% ois Po Loc910

gs 9goJE-

45 9goJE

1g-•(00- 13q.o0 Zio F. Gt. 01-5S CPI Md1 11a5'7E4' s 9 Sfefr- 0-1 .1(t,m : 967s'

yetos

9ro66

°w

qeb$

160

967o

90)

9676

9673

967.1

9b-16 1 3y.ao

7 677

9(o7S

Iu-,50

i2.00

ILS.so

1t1.e0

12F•50

IÿrJ.00

31•50 1'9'50

1.33-oo

I3-ka

136•oo

137•5a

1yo.5o

1tiZ;oo

1Zd.00

IZS'.So

Ia7.00

IL£s.5o

130-0o

Is1 -0

133.00

134.5'0

►3fo.oa

117.5o

139.00

Igo.So

I1•f2..00

1ik-i-1

1. S-0

I.5o

I.512

I.S-p

I> Sa

J..."0 0.18

I•So

!-Sp

1,50

I•5b

1• 5o

I.S-0

1.50 '

0.ÿ

~

0,23

0,03

0,02.

0,01

0.07

0,211

0.17

p.l(,

0.2y

0.19

0.1$

043

O.Oy

0•28

0.011

0.02

0.02.

0.D6

0.34

0.26

0.09

0.17

0.30

0.09

0.10

0.01 '

0.03

O.006

0,G^2

0.001

(a,0o2

0,Q03

0.007

0.006

0,002

0.005

0.010

0.003

0.003

0.002

1

0, 002.(

Gasee° •

ydcea,-1 Z,°% F. Ge- ptss • Cp.( ;As M,,Joe. Po '

,JoN16eovs cc, puzp 11.91ea,n1E Fe4crdeES soft/I TcJj ., 7e sv>p41Dm

)3s 9604E

E•o•11• I`lzs9`><M

or sToe.EA, Jr..! eouYNI -AloenJts9 Ctc 2.-5 goxEs CocE •

DIAMOND DRILL LOG

SHEET: I OF INCLINATION AT COLLAR: —q5°

SCALE:

GdDlWURC/al RESOURCES L7110o Lv `~t rrvy

NIC-91-11

SE©EFaC T 5N©

tit

AREA: /JICogI L9KE CONTRACTOR: Fok,96E a&Qoir CORE SIZE: 6R CLAIM #: 3-50&2-52- PROJECT: tJ ►Co&t 1-91cE DATE STARTED: 26/041s DATE COMPLETED: zblog/91

LAT: DEP: ELEVATION: DDH #: BEARING: !go'92- TOTAL LENGTH: Fs 71s &I LOGGED BY: G4-0/\

FROM (m)

TO (m)

METRES SAMPLE ROCK DESORPTION, STRUCTURE & MINERALIZATION NUMBER FROM (m)

TO (rr~

LENGTH (m)

Cu rt.)

N wpm)) ( pm) Co q~

(cyt) Au (g/U

Pt (pub)

Pci tc,pt

t. Z,L

o

8t •18

I.ZZ

.. ,, u -i .., -,,,$)K. GOW-o

9 6~ ~

96k0 '

Z95o

31.00

31 •o0

36519

1•~o

1..56

fil fie

0,01

0.06

Q,02, , (jr002

0►003

rvIEDIUM- Q13bc GeEEn1 Ozt°&, Mo7rab oFFc~4l7E. OvE ro POO►ou,9SE. epmPos, rich.1 ~So-7o'lo PsienxEr.tE/oLlvb,1E 110-140% Pv96t RLTep-.9T10/4: t,J6.jt,-r1oorc.P,97-c[.y C>9e,Bo^r~97'IZe4, ,LO('~911-~

9r•r1f ,SoL17i~ ‘s,e_e-PEni Tin/ l?,F,r,. OVfe91.1_ wFt31c1-1 M96n)ETIC 11_003/44 5T2C,JGi-yf M.9Cr1Ei ,G. MinIFP~u7,7ï ~p,J ; V/9P_!Es 1-UC944.4 Fe.oAj L I °fo QISSEI^n, 10TFJs To SErn1-M9ss1vF -To /:t19ssivE Su1.drl,1bes. sot-Pt-boss occoe--95 Pe,019L4 ,.NET?E.X7dcel ',No os SS2.0.76(¢S wiletz. !?6-nogluzEis.. 714E. Pe,..lca P/3L SUumj/oG5 404- lnl 0P-I'EP oc pEcP.F,-46 193,k.t.6/3NA',Eg F"P2QtjoT,ï E t Ci♦9LcoPsfe,TE~ Pei-in-/9,4o '7k. ` P.fe.l;~ ~ ,..,-)0,4.

IYltce0îa9.teo- Is 7+}C 7~.,Pr) usEn. Fa2 79€ FiNIL 6bjk4EA N1FeSiu.J ,vg "V;& 6govE PlE.N1i1d.JEp t.yJ11..

ei)s1".1G

F.Z.orn L°).-70- vb73 /j cLr2,'CC. STu 16~993- 66°TC9 , t:oM,,,.U,o)E, ~ 1 To- PI, tir 3001 O,.~ 16"11 ~,,,n . c~rL, cC 's7'ea.s C,i~..es Te~.1AorJG

66°7 . Z°!, otss Pi ,~, "ii woe. PO fjaD 7e c.P`l 955ou97Ep ,;., Ti}E

'("21y4GFJ45 , 9r 30•n 9 3MM 'car-/Ce. STeJm16F2 +i, 3e°-2'A a; -re. Po .

Oveem.L Tr- SuLP! j iDcs . Ar si. (9i. 9 5",,r‘ czt2/ et.. STek.iGE~ 97"" H[ T(l~. 9r 3a. yo 9 3MM r.vz/ce srel~~ ,~ r,t~e P~ ,c:P~F,9~ 52',°1-09 _

DDH #:N/cRl-t

DIAMOND DRILL LOG

SHEET: L OF

i METRES

FROM TO ROCK DESCRPTION, STRUCTURE & MINERALIZATION PA16ABE~R (m~ (N L(ENGTFi Co

P.1 ( Co //.~~ .

An (g7t)

Au.. Pt t ~~r

= ~ ~~

Loc91-14 2.10 .sLts P ,;a Te.eP , 9T 32..7(0 9 2-3M,n. co-TZ)cC e J~ sTebJlo~ 9T Zo Tcsj t w r1 J nloL po> Pl > C T~o.

Efor~ z~}.~II- 34,~(0 ,9 c~.rz.~cC Srer~ gt G~LfT~ 1 CoM9(2,4.\/G 11),40e_. PJ, TF}E t%oSr 2ocL co,,r9+..ls Te. soc-Prj,Nes,

~~-1-i.°ie A tss Po Pi

Fe-ID/117.34 — 37. (Pa. — 2'/0oLt5 C,PY w 110 ot5s Po 9SSoci31 CLi C.--) Ifr9 tPwps1e Ae})c7 vas T&g-,431,.,1Co Zo ° 9nie qo c'70, .

Loc,51.44 ) d/o 1516.5 PI/ Po qdsTr•,~ g‘t ru•rlut.67-c -TexraeEA C;,roe. FEh7 +}+gJP,p,/E, FeiqGTve-E,S s0B/I Tc1j •

g7 4.3.7s- 9 1~~~ i.JtDT1i~ Q7Z.' Ce. STC,..~yE,e. ,9r 15 °](}j

Csos // . Ca ,JTgin/i•.1Co 1"l, i,ioe_ P 1 . or y I. Lo T1}c Ge9A97-1 0A.91, 86,i4".1)46 c1F- R PL,3 12r( cIf cur'ioU9TC. tonie . -

9T I-11.75 T►i~ Bon e M or- -1* pt.AG z.o..IC Mc,,,rnonk.6 6B0 J6 1 7*5 w 9 6ZA4t:,r7o,a9L_ BtJT 11157,n1GT 7126^3 vF y7 °Tîi9, FEaM Li1•ÎS— lit. P-1 Z°io pi6s PYPo) 4o.~~ Cunl~ugr'E. TE.~.?de~ C. 6e . G983.e,o . F~ . ~{ - ro z 7~

~~ 4 9 PLr y6 RdG) ?o..1F /95 fl6oJ~ re.Cc6009L. TP,E.,/a,. ^'.-:- TCJ~.~ 1

~,k ~ I

~j(oFl2.

g63 .3g.. -.0

160

1685

iFjôlo

10g7

76E1 ~;

cum

~b9 {

3Z•So

$00

37.0o

38-.50

1-10.00

91.50

`I3'oo

o ~.Sb

tit, '00

14k":)0

3ÿ,00

35-5•~7

37.0o

F-~0

go.do

I-11.50

1.c70

,14.50

~.oo

14g-0d

`Îi•lo

1.50

I. 50

1.5.0

1•53

!•so

I.rjO

I . 50

1 , 50

)•So

Loo0,07

I~ l0

0,03

0.02

6.02

0.05

0,0§

0,03

0.1 LI

043

Q.1Î

0.21

O.O~f

®,OZ

00z

OfOS'

aOS

0,03

02.3

0.11

0,19

0.1a

O,Z6

0•0!3

®.O~L

laoZ

0/002.

0.002

0.002

0•010

0.008

0.006

0.004

I

.

li

0.00g.P.au,J,Y

r,..+~ tie. V~' 1-1.9 ~ ~ uCP~iA.~• CoLG , 70% N-a,.~va•Ç~~ .• ~i~

42.-717- Lh.7y J9 8A),rA OF )-2,."/° aSS Po `Te.eNcy./G 35°7cJ-

9r 43.q3 ,9 c,.,, g1..f)3 CIF N4Po.Sive Po? CPq> Ph , 9r q,40.12., c6n A) snn 9c.1. CI c".,-. Qr-ca car= Po It'.-) .

QiGJL+,)7L Zo..JF 1 bIscU,„4-1nÎLb✓s FeoM L1 14,76- 144.ss A i004, %} ~M

99,41 IiTO C(f9P9i-ci \\ > 1-40% &KS Po ,9e.vJrJp 1 6 iS 6QF/j • Fe-6(v\ 1-15-.)H- q(o -00 13WG~q ce..ex -4 e5 lo r2Ec4v61✓4,.

Rom Li(o,20-- LI7.) ;vu6t, w 2:1/4 ois, P~- Fe ;i~i7.31-`II~IS 6 CoU:_ ^'6o'/a RxC1'/•l~P 1T~;S 1..f7'EP~~- IiS1c.lGPi~ AMP -TWO; ~dr9 • ._. . /.. . ,. . . . ~ ~

9r s-I~• 63 /9 1~, guLL GüZ sr~,.,~,~ or 7ô . re suir~Jln~:s 1a.1 riosT

-

DOH #: nirc of )

DIAMOND DRILL LOG

SHEET: 3 OF

METRES FROM (m)

TO (m)

ROCK DESCRPTION, STRUCTURE & MIIERAUZATION SAMPLE Nl1NIBER

FROM (m)

TO (m)

LENGTH (m)

Cu P/•)

N Pm

CO (ppm)

AAgg (glt)

Au (g>t)

Pt (ppb)

Pd tor

t{q•)a- ..,L6i. foci Ht_3re-En GrzAteo •

,

169Z.60.50

9 693

9694

- 96q5

9696

$2•Qo

5,50

.0

56•50

~so.So

5Z.00

5.~o

55;w

5 •jp 6

51.00

55 0 0

I•~io

1.50

I , 5o

1•5o :

I•5o

1•0

0

4.06

0.25

Q, 29

0.1‘

0.2.1 .

0.28

0,04

0•1{5'

• 0 31

0.21

2I

0,24

0,002

0.012

0.Q0$

0,003

0,001

:

F91,.1 i J. C. 9) I7 ° Tc9 •

T►}1s V n) f; 1s C13,909carce.f7hN. 8l PrJsifkL`1 Gl1-ouriLEA /rFTr- --BEJ•JG

f31c1T1rE P~.,se,--ii nlFA2 T,jE iJU!'/1E2,00S SEzP6.111J1 Lep .XérbL.17050,oT OF T0E 410414 14P~Ffouc,X.- /j niA

' ‘ .`

~

0.(0)

UPPC-a-

int,,.rE.e.gu7.E6.

qy

9 t-164r- MEo. Ged4-0.1 coLoG 1 /5-MPh}tRv`fT1za• 5-lo d/o

Ca,V7Var - TJi'i U•.J17 cur+Tsj1,.1s

DlKks ce. Sit-LS gEr-9,1S-

,Po U~,aFA Ca^t7'•9 GrS 1••1 Sc MC .

PeeSEr.aT : ovfXsji.L Z% 1JtSSJ-79-75yq,)o 9T 7o°Tc6 w "VC n.►cily •

QIC7ESTE46. 9VTot-1Tli, FteoM

op 9 SF.PpFiJJ 1~7i7~/j J(E+~bLIY~J )s

53•20 o \~Ji ii 5% Po?cP~ rt/MVl.fjjF Tt.,tTJe,r4. îa9.!,5eO.

J9 Z-IMM P~ ,Pn srei~lCor2

i•11 Z.fJ PfeIDor;,G XF...xx.1T~. 70 3E 76r•tS1o,J 6AS,46-5 ‘

Fit.1.FJ~ ~ Po ~1h CI) -

Z°.lo F-GQ. alsz Po w Cpi,

t46t. t C9eSdpi9T1?,a, ifte_gQo iae

1 t. C,. ieP-E.6vt~je.; 9; ~ H3°~• F• 6Z- h►ss Po > c.A~

Ff4M 36.8(0- 56.311d,

PEeaboTiTE. xEnlOt_tTt~.

'CgsES~ o‘1F~t.t_. ST2o,.10L-~

Feoil 1494o- 5o .co 5-I0 c /0 6 roTJTE Po- 9T y9.6It- 6 I cr.Y, 0.TZ sre.,,Jbee_ Feonl 19•g44- gcb95 ,9 P9eTt,914 50•?41- $0.2-7 95 9godE.

° )o~-IS /o \►.F.ee cAss Po??CfqovF.e,LL.

Fe-on 5- ..00 - SL, IL g PA eflOnJ PeExl•.,.a i 1 /1 Tc6. gJN SZ.Zo-

9s +--N63 - 76,clue-C 1..1 uJGu- t6F7nlca.

/0 5z• 14 I IT. foo ° 9T Sz• St Se // 7r~j.

Ft-d^1 53.711- 511'00 9 sE•ePE•f

Fedin 5 4{.72- 51.97 wqgr 9Pfc)90-.

EN EG ~LorJ .9~~ // TTJ9 ~ Loc91•1-'( T}}F~i 4osT Co^JTfjirJs

Fi2orn 5S-" , -3 5.5•ss0 8 S EP-PCi.tYl..1 ~(F1.10u Th~ (6 u.0 O.C. 9T 33° TC9

F-2or~ 55-.80- 56• 5o ?~ l n°la

O46P07tt4- 5-10 '/0 F. Ge. D15S PoiCP`L• SECPCa1TJe.1tZEp C9e80rJ97tUFA ,

DIAMOND DRILL LOG DDH SHEET: ' I OF

METRES FROM (m)

TO (m)

ROCK DESCRPTION, STRUCTURE & MINERALIZATION SAMPLE NuIBER

FROM ~ Im)

TO UN

LENGTH (m). •

Cu r%1

N (%i

Co (ppm)

A® (g/t1

AU (g/t1

Pt (Pit)

Pd (col

Fed/1,1 St.od -S.-1.00 = 10°/v ir• %e. 61Ss Po Ci'/ v.AZ9c(-•

Fe.,- 51. 10 o ScJ,VZf~ I P.e1 G>rJI C_ x~101~{Î1~ • 0.0(~ 0:21 0,1.1.

~^i 9617 sa-.00 51,59 I•~~

N'✓fgt,l. 5~1u`/~ Nil:. a1SS Po w 0/),,,k)2_ CA j . P.e.u^~ 00 .10-ba.1Z 9~9g ~-9.5o 60.67 1.17 OAS 0~23 :~t0U7 PE246070-E x:E..i0Llr,j

F+2.un1 60.cb- 61. I Z Z5 % r.3.67- TS.,Civzri INC) wrnJ,NIuZ op,/ 1697 °' 67 6Z.31 I.7Z 027 0,53 0,009

GI .Ir,(o- (21,81 5TQy,J614 G9 J'•13onJqT1 a11 Z.oNE .(pZ.ov- 4,Z.t

Z.1q l%)~.5 Pi) ,n) wFi1-1- 84.-Fll~ Cc:, vlfiiZ. /cr^_avcc+ •

R. ,3`1- 6Z.5& Jr.l~..t~Jn117i..A ,Ç/jebOn/PjTJ tCA Pe.-e1c1GT.0Tre `1700 62.. 31 (4u 0 1.6I 0.09 0.07 0.003

Xp:,.t~G,.)74 C?.'. -;•-TcJ-i - (oZ. Co5- 6Z.$11 GtfyiJl; 1C NtGE

611v..,..r.7,J,T-E, F'tJ.P4-69e•17JC. w.^n.9>✓ic. Jr-JCJ-05t0../5 ✓P7"cv 14Od/o, { -hn17 ,,-Ji(J(L ivL,Joe. G )"1/ . ~

91- (051 0e. 2.4.40-. PlJjv . /?aG-1~ eye),-,AN i-,.-::: Zv% ~-' l ~ /,-; 65 TCr9 •

pp..), ,„,•\ ç,,.I•04- 4o-1.3s- /rl)C29CIAP,g@'VJcJ.,C.:rnitGo -1- TO - 179.50 .uo (pt;.va z.cJo 0,01 0.03 0.602 ,1'1012i • _.I)r..,"efas 4- Tv~ - Gil 35- b,I ;j`1 Pa4o 24 Zu,.,E, CUNu%t,37 '

T>✓9-7c-P-6 - Ir t GiLI. 4Li - 4,4 .,45 r9U Wo.a. JU J/,•JE i3o13.7"> Cz-; r.)..-,~ P0 5>Irsi...`j ,,..Jr.~9ic.- sr=h..Il r-SX 1)r\lC-kf,lr\E,--Fr

6L-t• 5y' 61{• 11 r• l ic1Lur A-ts-seo / .JUJ_c:9rJ1 c. ? gr-PCo2.s Py2,c,t_a4f9ï4D. .

Gil :11- Io1o.aO/VG. 2..irg, 07 6s.14-3.- 65.5.> 9 Q-TZ.. Uea.1

1a,-161•Jt9 yv`' 7-03. ?.% ►'J'SS ell C--; 41s.T P/ 97- 0.C.11J 71~-

Vrl+^1.

(d.,,.(01- (4-727. J~iceo~ 1 7157 66.~ 67.,v I.so NW 0,01 0.0o~

G,t9P3„o.v<jL guj IN1:a),.Jra' ljT- 4 j2,° T(.9. L.t:. 5494.P IT" `I 3°To9. Cv,Jr.3,..r; F>✓w I•.,•,rt ct FILLF-A .Ti21v.IGf..t.'S I6°T:~9.

Loc,744,•1r , 1= Z;,la n)5s P.) ,p..1 1t,' c. c-k. i; uSj- . '' '

,N ..r. s5 ~'•C P)?' P ?G /9~ ?-~' Tr 1 6,• 5 ~~} L~~, ~0, ~ a!= s•- ~ I x-~ I ~'

y ~/ 17`1 K 67.50 6`1.IL 1.6Z 0.13 . 0.t1 ' O.00g,

-Icq , y~C9lL'i (-Z`~/o l)1~s ~.UL.I~J~ 11~ïS ►,v7J%~. c. Ge. h~vSÎ.L?OCk.;

, I - ;

DIAMOND DRILL LOG DDH #:nHc 11-- il SHEET:5 OF

FROM (m)

METRES TO (m)

ROCK UESCRPTION, STRUCTURE & MINERALIZATION SANPLE NUMBER

FROM (m)

TO (m)

LENGTH (m)

(It P/.)

N rm

Co km)

Ag (g/t)

Au (g/t)

Pt Ippb)

Pd :. (ta,

.

6`i •1 Z - 19.00 nLtes2lï~9/zSev

179-5c

1776o

179ro1

II y ~L

I 7`! r~3

F'r,,"e\ 7,--..sti-1S-- 1f5 l) n:`77t1:3-024.A. Zar.1r-'1 ia1)1....4j 1s P.3Q.j c:r '

'71.1Z

Tu. So

7t.uo

7',•,>o

1• . *d

70•5o

t'Z ,00

7.3.so

.T~:,.,v

7~.7&-5-0 1•..~

I•zg

I.5ô

I.»

l • .>r1

a17

0123

0.27

p.36 '

O.%

.

0.7y

0.63

0.(•!6

0.18

135

0U3B

0.013

O.oib

00313~

.

.

_.

(le:, 509 p,P , 5u.5 JEP31 (.9 (_ TU? C L 10 ° 7-C)9 •

T45- . il:C IS : ,lr3QY~.6. P-f 9 5C.rn1-/`)/jSSIJ,C To M/3St1vZ.: 1.MA:z or Po >? P.i ‘ w i.I~T 76crvP.g. ~t.i..v"► (91. 60 - 6Ÿ •(aîs fj 5 ✓Y11-r`y9Ss ),..L! 1 n]•I.7 TraC517 JS thNJF rjT 37" iu,• IiucTM. 81 0 J. Ai roe- N11ceo'Gv-N?.gzo . re...o ^`l (,`j .'70 - 70 . SU t.'.o j12... z, E. GI„i?~u,\.14, , Jr_,E? ~ ro eHSy-ji io..19L- Uls.1YjGJ::S I,JITli rJ0 PP~...1=:Se~~. ct-l•S.,.r,9;(a.4.

ti Iolu f~. tot .t,►sS Po 7,5 M1,Jo2 C1q OJ:P-9LL. 009Q•srz• c.D,,4J61 (=P orn 71.20 - 7j 1ti 7EE.,)hIrJG ,.-, 2r7 ° TC.9 .

9i 7z.1.?, g?-,..,--, Po >Pi S;a ,..16`t=. /jï' So"-r tA. ,97- 7Z•5`7 1

sr,,--‘ P,)?- F.,1 ,,,,.~ e_i -Rot,'e ‘-97-• +.s°Tc,9. r2 L)rl 76. t''1 • 7• `t(: _j ( r.'^. .,rrr7c.•.f ...J s J/•_, /- t"--;,),,..w.7,--- Ïr!„L.jJC'F_. 0.t..; or C.000 c.ccaiv..l .,7 ?o° 1 c;9 • 9...f.c. 7:7di9et' • 1-..t . r91,4 r G•PtjLs9Ti o4.,):3L' /jl 445' YCO - '

F2o^rt 7-z5-- 73.145 c..ete. 49&. k.1 c:1) 6,,,JC. T2.I:,Jo,.J~ 37° TO 3,JA to, ,17-2)a.J 1 ,..1(U 5`%0 ,av".r c.P1 w L% 1,1s5 ro . w.•-nwj;~ li"~)C7-J2E: P25sfl- •

~ . ;•~ - 7t~. tio P,9~; ~i' ,S or- ~-1~ % F. t,~ .ols, Po ~~ c•'~7 • 7 _ 0,0~ c~ F 1t1.j"J_~ (r~c9cweJ~C I -y v,M aJipr !jS

I~~:îç~ 7;.ao ,.t. t F'+~,A•L

~t-k- 9; 5-..),:,-, ^'o P. c,:,~.A1sS Cr`~ ? Po' (~e9c.,-Je_LS /3e1...1// rc~.

7.o-75. bL 0,,nv M:..1

~7-

cl2ar.~r~ Po ->`7- 1.".) } P.,,, g1 Ll%~

r:A}Gi-iJeC,S .9. 4r~ e.1.Ji?~ r . ea"/1 I - i7 irl rf uJllNs'. ~s !

~ F ~ ~ v,Ji ic! ')Q~i,! 9~ye.~_~_ s~f~~ I 7. ~! ~,S ti ,1; J 1~3 -4 4r~ 17'. Oz.- I:a, T~ q~Er ~E ~(12Çn :5.5r:1► -.,e,5.5.,E ev„F

. .

L 7t3 ) ro = t::rj.

-11,.u11- 70.1:5 1 3JN1r..-,t-, '.15 et. Fu..t./a,' 1'31t?1..1,.-4- r,e!>c.,i..,e.s 9; ..

?A') : .

71,,9 .

7u.'1?' 7V.'Sli ;j•e)I-'ivy9i7lJr "-gill- 71..7.N...-1-a..tirfs f'J>•t t' Y

,9r 'Is r-7 B r~ 11l 7o tu, .17 :'l..~e .•V ,3 .'l' .(;.;.e'. ~'rJ1J• 1

DIAMOND DRILL LOG DDH#: SHEET: OF

- FROM (m)

METRES TO (m)

ROCK QESCRIPTION, STRUCTURE & MINERALIZATION SAMPLE NUMBER

FROM (m)

10 (m)

LENGTH (m)

Cu PM

N` (%)

Co Wm)

A~ (g/t)

Au (g/0(ppb)

Pt Pd ïpr

7h,5o - 77.3z c. Ge . L,,ho I1~üvl +

I191o7

IT`9 b(a

SV(.) tJY ) •54)E; // 31.,;)•

7v..~"v

78. S-0

5u.uu

71-~o

fSU.vo

~s"1. 7k

Z•oo

1.50

I.7~

O.IS

0,20

0.34

-

O.O~f

0,32~D.016

e.$q

~

ti!é, ~

0.026

:

u• G. 9 I-`' 5'~, TO L..C. .97- z7° 7G9 UvCP.gLL I- ..`'/., r G2.. pts5 w ` CP1. Feow-1 77•50- 7g or, IJV/`'éGw✓.S c.c... i-"ILLCA I19,eLJrVr (-,.•9c jilina. QT. ' 6)°-T(..9

Fkor, - fa '.i10 - 78-..3.-ti t. &e.. PO:; ,e+,.0 z~.+,vir;_. ,9; .37`',I)?,

Cur.1 7~j,,.J,•..aCa 9 1 i..•.1 e,,9,1(1 op Tl ex) t1Ks cil Feu~ 7S•.;( -- Is-...5-z. // ro -3-4C 1....c. .

iji' 78.•75 q .SE.EIFS or I,~,~.y-) .-„ Ic.J5e-91 i L%.-TA ~ P, .;a ('Pq , Pi~r21~, :~_ %k13':Tui Pi"~ÿ ~ s(a ° TO, ol~r-sf zs~!~ ~,~ 5411_4' E.-.4._ .s.tn),1....f)l<

reu-ri 7g.`)7- 71.00 9.S5--)I''+').95.',: v;C NI!..-3- i-cxY -c.~.,~4 i_-..ts.

Af .37" T( 4) r(Y7P1~5 TI)F ac.,,./ Ti3c,i' U r VS 1_ c`!)ic.ec0LZ1320

:T.; A c., • G t. • c.9.3IS1t4:v • _

`I`l.00 ''' FS1.7x C. 0. 0Ag.gP.(0 u.c.-9,9rr 9r 37e -11)?.

" r~~7 g iv+v~ 13i,J~ aF J~15Ç c. 2. P~ ~C.P' 9T ~Î2.) ;(,q . ~ ~ '

Ti- 2o,0 g iv-nn Po srea,JrvFp. ~ 6 a TL .

50.1I5-20a S-g 9) vv" g.9,,ii or >>)d% bIss Po > e e4 Fovr)0C0

i,•.I /j2C /77-(-4 .

:)-r •sc) •-r3 0 e.,,,1.•rt PISS i'd f";:),Jl.N PJ 10'1 0.1- zln ° r cA •

go,E<L" SI • ~1 MI:JrrUrv9+s!P,LJ i Cu,4713:.:.n. r("ie.,?0Fjjl0nlx 61rrC14.4"

T(1 r•r),94E .9- j` fÿJJ f 0SSIeL%( r)LrylUil .-L ÎC,, •

f=t.a,^'l & I . lo - a I , c-I 4 to ' eA `% r c;c ,sir:::;-- Te.A.s'tx h :- t. P1

I c,),J

rP,),-s ssi• 5_4_ &t•to7 .9 ~.tr1 Tz.~~eF.s , ~,,_,0,);~~ (e~ru37F~

~: rit.:-sr/rt I~. M•9 551.1t !°-> P~ ~ ï err.lNrJC. ^' 5;`' Ili? .

r.ü :ILl. Vi.7& ,.,

I &.))<85 ~r--, c~.:,~ S"7-6Z~~ ,, l ~ ;~ ~. .5 -~~.b;~„~~ ~:

t~ppm) (s t) Pd (ppt (atpb) (~t)

M1NORCA RESOURCES LTD. NIC-91-12

DIAMOND DRILL LOG I GE©FAC T riNIC

AREA: iJICct LgKe CONTRACTOR: Foe905.. BEr.,to)T

CORE SIZE: B.

CLAIM #: 35o3z5Z PROJECT: Nleogl i. c.E DATE STARTED: z-7/o4/%1 DATE COMPLETED: .7/oq/ql

LAT: DEP: ELEVATION: DDH #: q/-1 BEARING: 18o°9z TOTAL LENGTH: si.5/ LOGGED BY: G-1-0/.G

SHEET: I OF INCLINATION AT COLLAR: -66'

SCALE:

DIP TESTS

o tit o o ~

METRES FROM TO (m) (m)

I•SL- .

~o) ROCK OESCRPTiON, STRUCTURE & MINERALIZATION

mEAluiv)- trvp.r.ff 69te-Pa 1'lE0101- 693eJc oar"' Cmve.. 1 iY1vT7ap, oFPc4.J4,3-E. avE TO

P4ft(dc...P4r- Cot-41(305111Cot-41(305111 o^I % 60-70% c e,~ TPalGEnJE/O),1VIn/E `30-t-fo% ~

9aF..e97104 : OW- revNeO$TEL-/ C9eFavr44TI7,a. ,1-004-1 9 elP41g014713& sEQPFia)TIn1! zEb. .

CNJEJ/jLL WC6tC14 MRP14•31G 11.ou34 S?~. o~~t.~ mA~; dG . / M,nitlisylJ1911o►~( : J9'erEs Locgal.4 F20M G )°/a. D,ssEMi.,/,~,t &a, Tis seplI- M95sIdE ?o "eoss,vE su,Jxd icE.S. Cx.cvG>9s Pelre,r9e-V `niEr TLXTdes ,94," 95 s-MArrE.es WileftE e,FiraSruza• TJf E Per..)rati)e- sOL.P4rJ~Js FXE. In) 02aa. Pe(.e.E.49$l.4t? ~$o/i.Jpf~nGE, P ieè:J7oTITF C,Ilr3,i.C,atqp.x7s PEN TIF~iJD1T E ) P%J7t

rqiCCoEa913gPa - Is7°OE 7reo1 o.sEIEA roe_ ArJE ok*Kolo. VE2SIorJ 04 74.6 9so.1c.. /hr~..r7,orvep 1,1eJ17;

e,95,r,1 Cti -

fo.)o 9 3r,•n 151> CP/ , t9e4,o,.19TE : 572.4•46E2. Air `iZ° 716 •

111.53- I7.30 Poo DE'JC7Ebb ;^r+r,..6 • 6v9,-.,F~. urTr.E. ,,o Poe. 6,69A91-10,1$2_ C°^iT9crs •

I6• 61- 17• G9 /35 93ovE ~JEzi sis- w9e To qPt.)Ta' \)

SAWLE NI

FROM TO LENGTH Qr (m) (m) (m) r/.)

DIAMOND DRILL LOG #: n~1c91-

SHEETDDH

:z OF !~►

METRES FROM (m)

TO (m)

ROCK DESORPTION, STRUCTURE & MINERALIZATION SAMPLE NUMBER

FROM (m)

TO (m)

LENGTH (m1

Cu t%)

N (%)

Co wpm) (g~t)

Au (g/t)

Pt (nab)

PJ (vn

9r Zp . 0 8 1 Lc....1 Wt. SrC/•lbet C"-) .m►,.►oe. cpy ►Y -r4E o,loez. Pot~ia,J oF 9 Plu3c~a.+E°.e TeF....iaa& `17 0 -ro. 9,4 orfsiloor Ft4.1

-415 smr..i bee_ 1P.a,./S ofTtlE CdP.e "3;4.1S, PoG ^• 1 h coven /ÿi .

17%7

17`16S

17967

11797o

ÎÎ °i-Î 1.

36.85- 36•11 2-S10 t?ISs ei ~;✓ e_P7 •

z8.5o .

32.dd

34-31

3Cr•oo

L11.00

No.ao

3.50

3(,.00

39.50

Z.50

h5O

1•50

1.66

1.50

('1,015

O.%

0,05

On

0109 .50

0,02

0.10

1~r06

°

0,0!

. 0,01

0,00.1.

0407

0.0U

~r7~

0,006

I

'TFX.TvQEA

gr tn•CoSot) Zcrwl arrjce- s.~,.><,se_ co,.►J79v,1046 c% imss ?y 7ZL.E,rm.s D ~p° Tc.y .

FeoM LFs.77-•z2.4;::. 9 Nl'cPp66,66P.0 auCE Cp,irart^4^16 Z41/o bt% C. 6G- Pi 9aD 7P.En1(=.4,JCo 33a Tc% .fir Z9• IZ /9 5".1 fy srir.,•.ILf,I'

9i33°709•

ff.i 32,.ao-32►10 . 9 edvAi,l%oï- I-t,.Y+N1 N srz,,,,ka~.2s dT 2:0d70 •

N19C_( .C!„~fo Tl~ Co~►T~9Lâ CA TOE C -6C Co9~Co w ,9 MKeo679&,~c7

if j=~ ~~lT.s !:1 0 `1E.ti C3fYA69T;o42L co,•rn9c3" /57- 3? • 7P „,e) . 33.04-31.17 5-tnlo ditSS Po ve.+ CPI !,J g C. tat• CVMAOT6

e2,91sgwac l-joSj • -

►{.00- 3S.Ot7 1,06,4 I fo 111s1 svc.~>t~â. or 3~~ a7 9 3^'~~` I%

Po S7e4,46,5e- 97' Li76 Teo •!j7" ~•'" 9 3,n,~1 P`~15,~.~•.1CcE,e.9r I~m P,

330 ?c03. Qum 36.12- 36 •K H /YvGtua9B~Q.o TekrJl3t...& 13p70,4

3g.40- rs•`lb Z 10% F.tc't nlss (1. 31~-67-ge.711 Z_.‘ç%F.St-

61ss Po w .+~n,..be, ePl. Fnann 3g.71- 37.05 "9.s9~1zu~-, 569/%1 ~^~a S i eniS aF a7EF~c~3'io..1 o.a ~ t~~ sUE aF L' o4rE .~

¢I► l +•+1.4G - 641.2v ,9 CAcJPLr- dF t..-1,1 CC SveJnItGG#~,es rfi9 ,sla& 11/ IÎrosT%A R ~ 6 /,rlt c2o~g6,e„_P.o. ,gi' g l. yg 4 cr.n' Po STP~,.~t~ gf

• C13c.msyla•l6 ) ;53° TO. 9r 41.67 9 .3.•~ PI >Po sre-h\Jba /91,S0 9r s3°-rq-

si. ,11.8o- 14j.90 L Z°f. 11tsS fo w ?,~.

PiaoM t•1s: 10- '15.t,7 J c. et.. Plfj6 OstF.,5S vPro Lr.r.n v3 i.FwCt4, 6 es,J67t_1 lgo TC9.:

DIAMOND DRILL LOG DDH #: Nlc9 J-SHEET: 3 OF 1

MET

(m)GM TO

RES

(m) ROCK DESCRPTION, STRUCTURE & MINERALIZATION ISVU~MBÉR ~m~ In~

LENGTH PC/~) p.l

t Co fAg~tl

Au WO

Pt n~c

'

.;.. .

:..

lgr

. . .

115.3è- iis.51 ^' LSIo 4:Ls Pl , Po ia c.e.t.pi..96o Fitorn HS:'43-

qS. SS . Feope•, L1567 9- 1-1(0.115- Plg6 tick) v. C. a... SEcr10,4 w A,J •+xry'OrsAiti/IsF O•c • 97 53° Tc j ` 1....e .1- TV) . ~ Z% piss Pl wk,t11.1.-.

tognue..0rE -rt,7,70tdil. , C. cot. ovvi ,.iE 09r,r)p1m.ocrl7.ed, (?o, -1I'.vm5 7415 sec.., r©rJ )147.$90 - Lig .?,g. F,ev,+7 14.2.28- 1-'', 90 17ie tack tôroDFb i..ITc9 /Y /rie4. cae- E'3ùSeo V1% Z-5.10 n>t.r 716.)urver.A Pp. pm Lacorly .

50 • ZZ 9 t:w" 8.01.4. are. STe.,,,irolït 63- 65° Tay - r .1-1 ,950 50-.1 r,ttJc4 4TZ s7V-1,.u06e. w Te.Pi 9 T e5-41-09.

'turn. •51.0s--51.11.1 0 81/U. arz. q•E.0.1 6r -‘5$° -:it>9•

S1•40 - 31.66 1= 2.alo ~t3s P o ~:.~ r~(~m2 "A1 ~ 0

9T SZ.34 9 ~- ~~9e- NPP~*.~ 5TRo~o~ . 7~~ slt%JT~

_

Feo~. ~.9L--59=i5 3 r~-~r..~ Q~!.aâZ STLI~~.t "•1-Yc9 , ~

f63_ 60.16 Feu...) ~S OF PI 5.-10 r•► M )~1 ~rJ6T1). FeoM~l.oa-

1119Th 62.00 1- 00. F.6e_•ti1S5 Po ,P! ,.â rnI,•.,t4 Gr-y.

Feor1 62 • oo- roZ.7S 1 2,13 F. 6e.bISS I'v ,7-; r►k.eoe- °P.4- ri=o^'l 62.75-- (oZ.9(1, S11-IGIFIFQ fi Loc9L9i Z% Pc, , Te_ Ffzmi (03.o° -- 63- IS Io'f;, Po /9^S Fi..)E FkgcTc.eE Fitt. 1T2.cP1. FIT 63.0°, 9 Zc, arc,/ cc. sr2i,► r~e.. 9r~I1 °Tci'1, w r`~iSSI~/6 ~S or P1 f3r~b Pa , . ~ .. .. ~ . . . . . . . . .

5--100/t, ~I,F.6Q .015s • Po P, o~ ~

. l ~9r_L. • T2 c P .

66.00- fOTov 9s q60./E. 6740- 68•o0 1-00 bisS Po Lc4,7e.L4i Ri 67• 9 f;) 5/r+~9l-L Bag of /no .

~5 I0% F-pi • ûL~..QISS P.17, PI Woe.. CP1 , oVGe9u. F[?r~,•-1 E,1.c!a- 61. ys I Z'a►..)E or NET 7E)(7'‘JeE/, CDy J Po .....1, Tci9 r

l-Z d/o bIss Po. Rom 70. ,-1?.,---70-61 3 Gsz ./En 9y 3I 6 Iî9Bl Toti .

0.00iv~LL

',Tn.

179-73

I11711

1-1975-1117oii5

!

I1977

~ ~ ~

17 978

11 g,~

`IS•?$

`h.oa

~1. ui

r~

',Too

0.7o

~Zvi

~ nl

~62.op

foi-boo

66.00

69•S0

~I.QJ

1•7Z.

1 .7

I .~~

l C9 j-

e,.00 I

2• o

t.00

Z.spi

1•5c~

l•So

0.07

Or‘

©•lo

1~ .B%..

OM t

on

0rz6

0.17

0.21

0.l0

0•09

0'07

0,06

~°!6°l

10,07 1

( ifx3q

0►41

~ NI

on

0.f ~~

0.036 •

0,00g

l``j

0413

OhOfy

ü.098

Or f?0~

I

0,006

I 0i00S

~9c.

I o.ck

17971U.004.00

~r r"`

~

(Zoo

(a`i•oo

'f~•U0

o 6g.~

' DIAMOND DRILL LOG DDH #./41c 91- SHEET:II OF i

FROM (mD

~TO (m1

ROCK DESCRPi ION, STRUCTURE & MINERALIZATIONM~ERAL2ATI0f~! PLE ~A.J~ER

FROM (m)

~ (m)

LENGTH (m)

Cu P/~

N (°/J

Co (ppm)

q0 (g/t)

}W (g/t1

Pt (,opb)

Pd (cm

oVEP1AL I--Z"/o F•GQ.DIss Po P 3e CPy. FiConl 7Z. 1?~

y ~/

57- 7Z. ~ ~ S~nrl2fa, ~26o~J9T/Z~p ~21D0r17E XEnIOL.~Tt~

73 .sq- 73. 9b ., InoA. safes.rriNruct. 938,30..o. 1-.2% okss Po t..uc,I.L./ i.J loST.

` F-12,0",1 ~~.<~~— ,~• ► ~ .~,~,,.~N~-~ ~ ~~~9>>~ ~...~~,,~

s,cT co►~r9VS ^-.L Tcg . I•~vsr C~ d -gl~s xE..101_17] 0.\ OVEN) Z-'IO DIs.S PO pV p~L(.

^-5 ° k G ISs Po ltw 1-z,d /o Iptss CP`I wog,4...~1 11as70)&I09

reycD • 6e.. 69+5cste.o .

Fft,Jerl 78•b°t- -19.so -.EAc-/oprd09Tnl st}.Reea 9T'7o-75 17-0. Te SJLPrjopcg. ov~},{_,

C. Ge.G9r.,eee FeoM So.17- go.yoM. . 117187 s ~1 IG' ~,,~~~!n^c.,.o.nw ~., m...-..~-~ .1,)-1(6.-?_... P1ûpn/t ~~Q - o- w~yy L C- u9y7

u•C . s)}q~2P 1/ ~-~ t-. C. s}~ep ..~. 7~9 •

~. ~J _ - ~ bi • I (C - a ~ • ~ 1 t~. . t7e . iG5~3L'A . H, ) o! •~S ~o I-” ~" (" / `

E.0. q. g1• ~j4 /''91

11 IS.00...ç UF c.deE Si ve,ce. 1ni >ttt,ir.1- NIve19,Q~t Q.

Q.0~pE,.17-I,JITF✓~ 4

I

17 6Z ~

61983

„9g ~

17°le5

17186

~

1

I

11,vu

13.06

-h.o0

77.a0

78050

`

~sv-oag1.5~(1.511

73.00

75c10

77.(b

7g3.0

ô0.0o

2•0o

Lop

1. 0

IoSO

L•oo „~ ~~I~

0111

0.19

0.19

0r06 ,

0,0~{

0.17

0•17

0.1~

0.242

0.11

i~•Cn~t~l.

0.Cor

,Uo y

01006

0406

0,~;`!

-

APPENDIX 6

CERTIFICATES OF ANALYSES

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 03/05/91 127-D, 8e Rue PROJET: 2814 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnic / Projet NICOBI

Echantillon Au Ag Cu Ni Co # ppb g/t ppm ppm PPM

9301 260 (300) 2,5 2700 5500 180 9302 70 (75) 4,0 1,62 8100 220 9307 40 3,0 8600 5,38% 1600 9309 27 2,0 6000 5300 180 9310 40 2,0 4200 2500 84

9311 27 1,5 1600 2500 94 9312 17 2,0 2500 5900 160 9313 30 1,0 (1,0) 2500 (2400) 7500 (7500) 180 (190) 9314 13 1,0 590 1000 70 9315 25 1,5 2900 8800 200

9320 77 (65) 2,5 9100 4600 110 9322 23 1,5 3200 4300 110 9323 5 2,0 1800 3900 230 9324 30 2,0 2300 6800 260

Les resul,tats des echant llo - ci-de sus sont certifies.

1 Ra Prinrinala Sta-Marrnainé ' J07 1 mn Tél at fax: f819)" 787-6116

TECHNI-LAB pyroana Nse geochimie environnf^ient

CERTIFICAT D'ANALYSE

34 Principale, Ste-Germaine

JOZ 1 MO

Tél.: (819) 787-6116

Téléc.: (819) 787-6527

Sans frais: 1-800.567-6489

A : MINORCA RESOURCES LTE DATE : 04/07/91 127-D, 8e Rue PROJET: 03044 ROUYN-NORANDA (Quebec) J9X 2A5

M. Joel Scodnick

Echantillon Au Argent

pprn g/t

9301 3,0 9302 3,4 (4,4) 9303 37 2,0 9304 30 3,0 9305 20 12

9306 18 3,0 9307 4,0 9308 18 2,0 9309 3,0 9312 17 1,4

9313 20 1,0 9315 23 1,4 9316 20 < 0,5 9317 23 2,0 9318 7 < 0,5 (< 0,5)

9319 17 1,0 9320 43 2,4 9321 7 12 9322 10 2,0 9323 7 3,0

9324 10 3,4 9325 25 5,0 9326 33 3,0 9327 33 3,4 9328 43 5,0

Les resultats des echantillons

TECHNI-LA►B pyroanalvse géochimie environnement

CERTIFICAT D'ANALYSE

84 Principale, Ste-Germaine

JOZ 1 MO

Tél.: (819) 787-6116

Téléc.: (819) 787-6527

Sans frais: 1-800-567-6489

A : MINORCA RESOURCES LTE DATE : 04/07/91 127-D, 8e Rue PROJET: 03044 ROUYN-NORANDA (Quebec) J9X 2A5

M. Joel Scodnick

Echantillon Au PPm

Argent g/t.

9329 23 1,4 9339 8 1,4 9340 5 1,4 9341 77 2,4' 9342 13 2,0

9343 7 4,4 9344 63 4,4 9356 12 4,4 9357 13 4,0 9358 18 5,0

9371 12 (10) 4,4

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE 127-D, 8e Rue ROUYN-NORANDA (Quebec) J9X 2A5

DATE : PROJET: 02819

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre ppm

Nickel %

Cobalt ppm

9303 3600 3,09 750 9304 4400 3,95 700 9305 6,21% (6,21%) 2,45 (2,37) 430 9306 7800 3,78 580 9308 4600 6,46 1000

9316 2900 3,50 820 9317 4700 (4700) 1,78 (1,76) 330 (320) 9318 1900 1,71 450 2319 3200 1,32 280 9321 2,98% (2,98°S) 1,17 (1,09) 200

9325 4800 2,48 550 9326 4300 0,49 120

Les resultats des echantillons —u- sus t certifies

par:

184. Princioale. Ste-Germaine JOZ 1 MO Téi. et fax: (819) 787-6116'

t!~ par:

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE 127-D, 8e Rue ROUYN-NORANDA (Quebec) J9X 2A5

DATE 03/05/91 PROJET: 02823

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cu PPm

Ni PPm

Co PPm

9327 1700 6000 170 9328 2000 3000 110 9329 1500 2800 110 9330 1400 2300 70 9331 1400 3300 130

9332 1800 2600 99 9333 2000 (2000) 3100 (3100) 95 (93) 9334 1200 3900 100 9335 4000 1400 69 9336 4700 730 30

9337 2000 4500 110

Les resultats des echantillonsrFi-,desius -ont certifies

1/

184. Princiqale. Ste-Germaine JOZ IMO Tél: et fax. (819) 787-6116

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE 127-D, 8e Rue ROUYN-NORANDA (Quebec) J9X 2A5

DATE 07/05/91 PROJET: 02826

ATTENTION: M. Joel Scodnick / Projet NICOBI

Ec han t i l l on

Cu Ni Co

PPm PPm . PPm

9338 570 1100 55 9339 1400 5500 280 9340 1200 6000 320 9341 1500 1,24 % 350 9342 3400 8000 160

9343 1200 2,28 X 350 9344 2600 (2600) 4800 (4700) 130 (130) 9345 2700 4300 100 9346 1900 2300 80 9347 2600 3700 100

9348 2300 4900 130 9349 2000 3700 98 9350 2400 1600 49

Les résultats des echantillons i-d ont certifies

par:

1Ad Prinrinaia Sta-C;armaino .I(17 1MC1 TAI at fax• 0:1191 7A7•611R

Les resultats des echantillons

1~2d Prinrinala Sta.nPrmainP `.1(17' 1 M(1 TP( pt fax. (8191 787-6116

~..

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE 07/05/91 127-D e Be Rue PROJET: 02836 ROUYN-NORANDA (Quebec) J9); 2A5

ATTENTION: Joel Scodnick / Projet NICOBI

Echanti.3. lô n Cu Ni Co # ppm ppm ppm

9351 1600 1800 65 9352 2100 3800 120 9353 2000 2900 95 9354 1200 1800 60 9355 660 900 60

9'356 2200 6600 160 9357 1200 (1200) 3200 (3300) 180 (180) 9358 4000 7400 170 9359 1000 3300 100 9360 980 2100 44

Echantillon Cu Ni Co

ppm ppm ppm

9361 690 1000 SO 9362 1100 4500 110 9363 380 1100 100 9364 620 960 39 9365 1300 3200 100

9366 6000 1100 40 9367 2100 (2100) 2200 (2300) 58 (60) 9368 1300 2600 80 9369 880 2500 67 9370 3500 3400 80

9371 1500 9500 220 9372 1200 1100 55 9373 1300 2300 210 9374 2100 1700 60 9375 1500 3100 89

Les resultats des echantillons ra i-d

184. Princinale. Ste-Germaine ' JOZ 1 M0 Tét et fax: (819) 787-6116

sont certifies

TECHNI LAB abitibi inc. CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE 09/05/91 127-D, Be Rue PROJET: 02842 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

TECHNILAB abitibi inc. CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE 09/05/91 127-D, Be Rue PROJET: 02847 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NIC0BI

Echantillon Cu Ni Co

ppm ppm ppm

9376 690 1200 110 9377 1500 2300 79 9378 1200 3900 120 9379 1100 2100 70 9380 1500 2700 95

9381 1300 1700 60 9382 660 (660) 490 (480) 25 (25) 9383 1200 1400 45 9384 1200 700 75 9385 490 470 25

9386 330 210 25

Les resultats des echantillonsryci-d sont certifies

irli2, J par: ~

. 1/

184. Principale, Ste-Germaine _JOZ__1MO Tél. et fax: (819) 787-6116

/,,

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 10/05/91 127-D, 8e Rue PROJET: 02851 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICODI

Echantillon Cu PPm

Ni PPm

Co PPm

9387 1600 770 74 9388 1200 1500 59 9389 760 740 45 9390 470 470 45 9391 1400 430 30

9392 14000 2400 89 9393 390 630 45 9394 540 (540) 400 (400) 45 (45) 9395 4200 850 59 9396 640 150 35

9397 460 270 40 9398 260 160 45 9399 350 620 55 9400 2500 2200 100 9401 2700 4900 140

9402 2400 4000 150 9403 2600 3000 120 9404 9800 8800 230 9405 2500 3800 160

Les resultats des echantillons qi-desti certifies

~ Ra Prir,r^inala Sto-nAfniaine JOZ 1 M0 _ Tél et fax. '(8191 787-6116

Les resultats des echantillons certifies -a sus son

par:

1Rd Prinrirtiala Gta_(iPrmainA .1N 1M(l Tél at fax (8191 767-61,16'`

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

MINORCA RESOURCES LTE DATE : 13/05/91 127-D, 8e Rue PROJET: 02855 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon #

Cu ppm

Ni PPm

Co PPm

9406 1500 2200 75 9407 1900 7400 160 9408 1900 5900 140 9409 3600 4100 110 9410 1300 7600 190

9411 2500 4900 120 9412 5600 (5600) 0,99% (1,01%) 220 (220) 9413 860 720 55 9414 1700 1200 50 9415 2100 4100 110

9416 2300 7600 170 9417 2400 2,09 % 490 9418 4A0 650 35 9419 320 430 30 9420 690 1400 55

9421 830 1600 50 9422 400 600 25 9423 930 2600 65 9424 2100 1500 140 9425 1500 3500 100

9426 1200 1000 50 9427 1500 1700 63 9428 1800 1700. 55 9429 1400 2300 70 9430 2100 3700 130

NOM

Les rew;ultats des echantillons

Par :

e t certifies. i

2/

184. Principale. Ste-Germaine JOZ 1 MO Tél. et fax: (819) 787-6116

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 13/05/91 127-D, 8e Rue PROJET: 02855 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cu ppm

Ni PPm

Co ppm

9431 1200 1600 60 9432 1100 1600 75 9433 2800 4300 110 9434 5000 ( .57000 ) 2,80% (2,8O%) 560 ( 540 ) 9435 4300 9800 190

9436 4000 3900 110 9437 2400 3300 95 9438 6000 1,88 360 9439 7000 2,20 410 9440 1900 1,06 % 280

9441 3900 1,17 % 240 9442 2800 (1100) 2800 75 9443 6500 7100 160 9444 2800 5400 130 9445 2500 1,49 % 290

rtifies Les resultats des echantillons

184 Princinale. Ste-Germaine JOZ IMO Tél: et fax: (819) 787-6116

par

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : '14/05/91 127-D, 8e Rue PROJET: 02858 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cu ppm

Ni ppm

Co ppm

9446 2100 1,10 % 270 9447 970 1000 50 9448 390 130 35 9449 1400 2,99 % 440 9450 270 270 30

9451 970 2700 80 9452 2100 (2100) 2700 (2600) 89 (90) 9453 990 570 55 9454 8000 1,06 % 230 9455 1000 1,95 % 360

9456 1100 590 40 9457 1300 780 44 9458 340 220 35 9459 540 1200 40 9460 1000 1200 35

9461 1100 1700 150 9462 610 5400 50

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 15/05/91 127-D, 8e Rue PROJET: 02865 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cu ppm

Ni Flom

Co PPm

9463 9464 9465 9466 9467

9468 9469

710 2800 9600 1400 1600

4700 400

560 1500 1,64 % 1,52 % 1,97 %

1,38 % (390) 400 (390)

40 75 270 330 300

270 40

9470 3400 2300 65 9471 1200 570 40 9472 510 810 30

9473 230 110 15 9474 1500 1,23 % 350 9475 480 330 24 9476 1300 2700 80 9477 780 1000 35

9478 280 180 20 9479 380 400 20 94b0 400 750 45 9481 260 100 15 9482 220 140 15

Les resultats•des echantillons

184. Principale. Ste-Germaine JOZ 1 MO Tél. et fax: (819) 787-6116

(40)

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 17/05/91 127-D, 8e Rue PROJET: 02872 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick NICOBI / Projet

Echantillon Cuivre PPm

Nickel PPm

Cobalt PPm

9483 1400 2300 59 9484 1500 1500 60 9485 1000 1100 53 9486 1800 3400 110 9487 1400 3400 110

9488 1800 2800 90 9489 1400 2800 100 9490 1500 (1500) 3500 (3500) 120 (110) 9491 1600 3300 110 9492 2000 2400 84

9493 1300 1700 110 9494 1000 2200 94 9495 1800 3100 110 9496 1600 7900 170 9497 8000 9000 170

9498 2100 2,30 400 9499 770 1600 100 9500 7000 7000 180 9501 1500 3300 120

Les resultats des echantillons

184 Princioale. Ste-Germaine JOZ IMO Tél: et fax: (819) 787-6116

TECHNILAB abitibi inc.

•///// //4,.

%//////, /////.'

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 21/05/91 127-D, 8e Rue PROJET: 02878 ROUYN-NORANDA (Quebec) J9X 2A5

Scodnick / Projet NICOBI A'l'i'ENTION: M. Joel

Echantillon Cuivre PPm

Nickel PPm

Cobalt PPm

9502 1700 (1700) 9700 (9800) 210 (220) 9503 1,09 % 7200 150 9504 1900 6000 200 9505 1400 5700 150 9506 3500 1,08 % 260

9507 2200 7000 180 9508 1600 3200 100 9509 1300 700 50 9510 2100 3900 110 9511 2400 4200 170

9512 2700 5000 180 9513 2000 6200 150 9514 1800 1000 70 9515 2500 1500 48 9516 1400 3300 24

9517 2000 5100 110 9518 610 370 29 9519 1400 440 25 9520 2200 3900 89 9521 5900 7200 140

9522 2000 8900 150 9523 2000 9100 150 9524 2300 (2300) 7000 (7000) 110 (110) 9525 1800 500 120 9526 1400 1,05 % 240

Les resultats des echantillons ,i-dessus- sont certifies

184. Principale, Ste-Germaine JOZ 1 M0 Tél. et fax: (819) 787-6116

.,i

.. .iiiriii'.

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 21/05/91 127-P, 8e Rue PROJET: 02878 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre Nickel Cobalt PPm PPm PPm

9527 890 2900 89 9528 550 960 50 952S 1200 4100 130 9530 2700 2900 75 9531 1700 1300 45

Les resultats des echantillons 9i-dess ont.certifies

Par : ✓~

2/

1R4 Princinale. Ste-Germaine JOZ 1 MO Tél. et fax: (819) 787-6116

580 580 30 550 660 39 560 360 30 370 200 29 390 160 25

9547 1600 880 50 9548 470 540 54 9549 750 420 40 9550 2000 1,60 % 320 9551 670 1700 79

9552 840 670 40 9553 870 550 39 9554 4900 3400 95 9555 3200 8000 560 9556 520 250 34

certifies Les resultats des echantillons

9542 9543 9544 9545 9546

184. Principale: Ste-Germaine JOZ 1MO Tél: et fax: (819) 787-6116

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 22/05/91 127-D, 8e Rue PROJET: 02884 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre Nickel Cobalt PPM PPM PPM

9532 9533 9534 9535 9536

9537 9538 9539 9540 9541

580 1000 100 1600 1400 60 1800 2200 89 1800 1800 69 2100 1700 55

1800 1400 55 3300 3500 100 1200 1500 64 410 (410) 280 (290) 30 (30) 440 760 60

1R4 Prinr'inalP Ste-Germaine .107 1 M(l TAI .et fax: (8191 787-6116

Les resu.ltats des echantillons

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 22/05/91 127-D, 8e Rue PROJET: 02884 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantilïon

Cuivre Nickel Cobalt PPm PPm PPm

9557 860 430 40 9558 2000 1100 70 9559 1600 2200 80 9560 2200 2600 87 9561 2900 2400 79

9562 2100 (2000) 850 (830) 140 (150) 9563 1600 1.600 45

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 23/05/91 127-D, 8e Rue PROJET: 02894 ROUYN-NORANDA ( .rebec ) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cobalt PPm

9564 9565 9566 9567 9568

49 25 25 25 30

9569 9570 9571 9572 9573

55 39 (40) 38 20 15

Cuivre PPm

Nickel PPm

1900 1500 290 270 160 100 240 270 570 450

2500 1600 2100 (2100) 930 (930) 320 230 180 130 140 80

9574 150 65 15 9575 120 62 14 9576 130 75 15 9577 110 60 15 9578 140 70 15

9579 130 65 20 9580 130 54 15

Les resultats des echantillons cri-dessus-sont certifies

184. Principale. Ste-Germaine JOZ 1 M0 Tél. et fax: (819) 787-6116__

'///4,/,;•

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 23/05/91 127-D, 8e Rue PROJET: 02897 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre PPm

Nickel PPm

Cobalt PPm

9581 156 122 24 9582 906 .616 39 9583 955 930 35 9584 797 354 34 9585 1010 471 34

9586 302 134 20 9587 306 194 19 9588 507 449 29 9589 269 433 37 9590 1304 .937 38

9591 645 ,483 24 9592 1148 982 34 9593 737 (755) 708 (725) 30 (29) 9594 959 690 29 , 9595 1508 2870 39

9596 550 294 15 9597 414 219 10 9598 1712 1075 20 9599 1710 2345 39 9600 2042 1793 30

9601 4726 3033 35 9602 1014 633 39 9603 1571 2000 62 9604 787 540 35 9605 1884 2802 72 ,v

Les resultats des echantillons i-dessus sont certifies

1/ Par :

184. Princinale. Ste-Germaine JOZ 1M0 Tél. et fax: (819) 787-6116

7j Y//i/i.X v///G ~.

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 23/05/91 127-D, 8e Rue PROJET: 02897 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre Nickel Cobalt ppm ppm ppm

9606 1348 1797 45 9607 1894 2044 50 9608 1840 (1805) 4080 (4098) 104 (102)

Les resultats des echantillons ci-dessus sont certifies

par ~6 " ` J 2/

1R4 Prinninale_ Ste-Germaine JOZ 1MO Tél et fax: (819) 787-6116

Les resultats des echantillons ~~

i/

~t.. .

sus ont c ifies

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 27/05/91 127-D, 8e Rue PROJET: 02906 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre PPm

Cobalt PPm

Nickel PPm

9609 9610 9611 9612 9613

9614 9615 9616 9617

1300 2400 1400 3800 1300

3100 3400 1300 1500

94 110 84 200 120

160 (3400) 110 (120)

'62 -34

2800 3600 2400 1,05 % 5700

9400 4800 (4800) 2000 1000

9618 570 49 1600

9619 1600 360 1,29 % 9620 780 150 5000 9621 280 130 4600 9622 450 20 590 9623 580 35 1000

9624 750 30 730 9625 200 10 110 9626 3100 110 5100 9627 400 29 610 9628 610 39 1400

9629 430 25 880 9630 910 43 1900 9631 1100 29 1000 9632. 380 48 470 9633 500 34 400

1R4 Princinaie. Ste-Germaine , JOZ :1 M0 T. et fax: (819) 787-6116

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 27/05/91 127-D, 8e Rue PROJET: 02914 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre Nickel Cobalt PPm PPm PPm

9638 900 2200 180 9639 540 440 49 9640 1500 560 49 9641 5700 3,98 % 670 9642 670 1000 39

9643 590 600 28 9644 860 390 28 9645 2200 5600 500 9646 150 (140) '140 (130) 18 9647 630 2200 50

9648 1300 3200 58 9649 1400 5400 78 9650 460 170 29 9651 480 220 29 9652 500 280 29

9653 600 '290 29 9654 2000 1900 70 9655 2000 1200 57 9656 460 310 28 9657 1900 3500 98

9658 530 •600 38 9659 810 1200 49 9660 1300 2600 85 9661 - 1800 300 79

Les resultats des echantillons

Par:

184. Principale. Ste-Germaine JOZ 1 MO Tél. et fax: (81 9) 787-6116

(18)

I'

,,.. 1 . .,

Les resultats des echantillons

par:

184. Princioale. Ste-Germaine JOZ 1 MO Tél. et fax: (819) 787-6116

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 28/05/91 127-D, 8e Rue PROJET: 02919 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre PPm

Nickel PPm

Cobalt PPm

9662 2000 3000 69 9663 1400 2000 49 9664 1400 2000 50 9665 2300 2800 60 9666 280 360 20

9667 180 180 20 9668 130 190 20 9669 670 630 30 9670 1800 3400 6ts 9671 2400 (2400) 2600 (2600) 58 (60)

9672 1700 880 20 9673 1600 1700 49 9674 2400 3000 99 9675 1900 860 29 9676 1800 ' 970 30

4WW1,:iii%

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NON

MINORCA RESOURCES LTE 127-D, 8e Rue ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

DATE : 29/05/91 PROJET: 02923

Ecilantillon Cuivre Nickel Cobalt PPm PPm PPm

9677 9678 9679 9680 9681

9682 9683 9684 9685 9686

9687 9688 9689 9690 9691

9692 9693 9694 9695 9696

9697 9698 9699 970G

'r_ 17975

290 100 420 250 450 610 170 170 280 380

210 210 210 180 460 460 480 490 220 (320) 290 (290)

1400 2300 99

1300 1600 79

1100 1400 59

740 1230 50

2100 2600 89

2500 4500

120

2900 3100

89

1600 2100

80

2100 2100

89

2800 2400

69

2400 3200 90

1500 2300 69

2700 5300 90

870 670 30

570 .380 20

20 19 29 20 50

19 20 19 20 19 (19)

Leg~ resultats des 'echantillons

41

1 1ÿ e

t.•- . . ,S~•

184. Principale. Ste-Germaine JQZ'"IMO ' TéÎ: et fax: (819) 787-6116

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 30/05/91 127-D, 8e Rue PROJET: 02927 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre PPm

Nickel PPM

Cobalt PPM

17956 740 300 19 17957 520 410 40 17958 1300 1400 79 17959 1700 7400 310 17960 2700 8300 230

17961 2700 4600 160 17962 3600 1800 80 17963 7600 1,35 % 320 17964 1500 (1500) 390 (350) 49 (50) 17965 2000 3200 160

17966 3400 8400 260 17967 250 190 49 17968 590 970 68 17969 460 590 110 17970 760 100 79

17971 860 930 60 17972 650 920 59 17973 540 710 59 17974 950 580 50 17976 850 680 50 •

17977 1800 3400 130 " 17978 2600 4100 140 17979 1700 2800 98 "

Les resultats des échantillons •'-dessus,sont certifies

Par:

184 Princinale_`Ste•Germaine JOZ 1 M0 ''TTéL et fax: (819) 787-6116

Pfinninglp`-Sig-C;prmainP JOZ 1 b10 i éi: et tax: (13191 787=611 6

Les resultats des echantillon

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE 127-D, 8e Rue ROUYN-NORANDA (Quebec) J9X 2A5

DATE : 05/06/91 PROJET: 02943

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon

Au Cuivre Argent Nickel Cobalt • ppb ppm PPm PPm ppm

N-1-C-E 01 5 240 3,0

02 5 210 1,0 7-

03 3 3000 5,9 520 98

04 10 380 4,0 300 70

05 7 2800 6,0 510 90

TECHNILAB abitibi inc.

CERTIFICAT D'ANALYSE

NOM : MINORCA RESOURCES LTE DATE : 03/06/91 127-D, 8e Rue PROJET: 02941 ROUYN-NORANDA (Quebec) J9X 2A5

ATTENTION: M. Joel Scodnick / Projet NICOBI

Echantillon Cuivre PPm

Nickel PPm

Cobalt PPm

17980 2100 2800 50 17981 1000 1400 40 17982 1500 1700 50 17983 1200 1700 49 17984 1900 1800 40

17985 1900 2600 60 17986 600 1100 59 17987 410 (400) 350 (350) 40 (49)

~. 1':: PT1in:1i7niCy ûtr=eTfriûlflc Ûûi 1%10 Ia51. ct.. fax: ~ ~~..(A19) 787-61.16

Les resultats des echantillons

17635 0,04 2,5 17636 0,06 3,5 17637 0,07 2,5 17638 0,09 2,0 17639 0,06 2,5

17640 0,08 2,5 17641 0,11 3,5 17642 0,07 3,0 17643 0,19 6,4 17644 0,04 2,0

Cu Fe % 0

0,23 1,87 0,63 2,78 0,22 7,91 0,17 4,28 0,18 2,46

0,19 5,00 0,43 6,14 0,59 5,84 2,10 8,11 0,11 2,40

Ag ppm

Echant. Au g/t

0,04 0,11 0,04 0,06 0,05

0,04 0,02 0,01 0,03 0,02

0,12 0,07 0,02 0,01

< 0,01

17660 0,06 17661 0,05 17662 0,02 17663 0,04

490PPm 0,83

710ppm 29,8 460ppm 0,90 0,10 1,26

554ppm 1,00

0,20 1,76 14,9 23,5 0,12 0,87 0,16 1,19 0,11 .0,93

2,15 18,6 0,30 20,3 0,19 28,0 3,60 7,93

17645 17646 17647 17648 17649

17650 17651 17652 17653 17654

17655 17656 17657 17658 17659

0,36 2,15 390ppm 1,13 0,27 3,25 0,11 1,86

0,14 1,99

2,5 2,9 3,0 3,4 2,9

2,5 3,0 1,5 2,4 1,9

2,5 26

1,0 0,9

5,5 3,5 3,0 7,0

///Y.V.7////.,.

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

Nom GEOFACT INC. Adresse: 127-D, 8e Rue

Rouyn-Noranda (Quebec) J9X 2A5

Attention de M. Joel Scodnick

Date : 28/11/90 Projet: 1997

Mn PPm

Ni %

120 0,12 143 0,25 53 1,04 99 0,71

102 0,35

72 0,85 70 1,01 94 0,88 82 0,94

133 0,18

66 480ppm 71 0,30 79 490ppm 104 0,50 120 0,16

73 0,29 20 6,96 67 q80ppm 89 0,12 94 310ppTA

84 0,21 16 2,34 91 200ppm 105 440PPm 101 240ppm

Pb Zn Cd Co PPm PPm PPm PPm

15 22 1,5 46 24 29 1,5 71 35 18 2,5 287 28 23 2,0 153 18 21 1,5 84

28 22 2,5 171 34 32 2,5 224 26 30 2,5 185 41 47 3,5 212 18 22 1,5 65

15 13 1,5 25 18 28 1,5 80 11 14 1,5 28 22 22 2,0 120 16 20 1,5 52

14 14 1,5 69 62 8,5 4,5 979 11 9,5 1,0 43 10 14 1,4 42 13 13 1,0 26

13 15 1,0 49 57 212 6;1 302 14 12 1,0 15 17 15 1,5 27 14 12 0,9 26

40 4,05 55 40 4,0 580 22 5,59 58 19 4,0 704 20 5,75 56 16 4,0 685 49 1,02 47 49 3,0 202

Les resultats des echantillons

184, Principale. Ste=Germainc JOZ 1 lt9O Tel. et_fûx: (81 Q) 787-6116

2F-1I-CID TECHNILAB abitibi inc.

Date : 28/11/90 Projet: 1997

Nom GEOFACT INC. Adresse: 127-D, 8e Rue

Rouyn-Noranda (Quebec ) J9X 2A5

1R4 Prinntnnin Stn-nnrmpinn TPI. -ot fn..• {R1 Q1 7R7.R1 1 R 107 1 (MMO

CERTIFICAT D'ANALYSE

Attention de M. Joel Scodnick

Echant. Au g/t

Ag PPm

Cu e,

Fe ~

Mn PPm

Ni %

Pb PPm

Zn ppm

Cd PPm

Co PPm

17664 < 0,01 1,0 470ppm 0,80 60 530ppm 14 8,0 1,0 26 17665 0,15 7,4 3,17 4,66 59 0,27 35 36 2,0 83 17666 0,02 1,0 660ppm 1,88 100 0,20 17 16 1,5 80 17667 0,03 2,1 0,11 6,92 77 0,84 42 24 2,6 530 17668 0,03 1,0 0,12 1,81 130 0,18 21 20 1,5 55

17669 0, 03 3,4 0,17 2,12 125 0,27 20 19 1,4 71 17670 0, 02 1,4 550ppm 2,67 77 0,50 19 12 1,9 120 17671 0, 02 2,9 0,25 6,82 57 1,24 38 24 2 , 9 214 17672 < 0, 01 2,0 0,12 1,99 83 0,32 18 18 1,0 73 17673 < 0, 01 1,5 32Uppm 0,81 79 310ppm 14 9,4 1,0 21

DOUBLES

17641 3,4 0,44 6,19 95 1,02 35 33 2,9 228 17645 0, 04 17663 - 7,5 '3,60 7,88 52 1,01 45 48 3,5 200 17667 0,03

resultats des échantillons ci-dessus sont certifies ~---~---~ ~ ~Ate' ,/-::*°Q'6-\;" -~

_ - - il-'ti~ .,f

-

Les

.2/ t ar:

7q ~////.•.V,7// //

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

Nom •GEOFACT INC. Date : 04/12/90 Adresse: 127-D, 8e Rue Projet: 1997

Rouyn-Noranda (Quebec) J9X 2A5

Attention de M. Joel Scodnick

Fchant. #

Pt PPb

Pd ppb

17635 17636 17637

20 116

34

21 100 187

17638 60 144 (180) 17639 28 32

17640 25 71 17641 16 86 17642 63 35 17643 117 277 17644 9 33

17645 9 24 (24) 17646 40 77 17647 < 6 < 6 17648 37 105 17649 < 6 23

17650 27 51 17651 154 95 17652 < 6 7 17653 • 6 54 17654 < 6 < 6

17655 7 56 17656 1,03 g/t (1,06 g/t) 1,15 g/t (1,01 g/t) 17657 =. 6 34 17658 < 6 19 17e59 < 6 < "

17660 362 600 17661 34 187 17662 11 129 17E363 96 188

Les zesultats des echantillons ci-dessus sont certifies i ~ • —. rih t1 t ~

3/

184 Princina+.o: çra_Germaina _in7 1 MQ Tel et fax. (R19) 787-6116

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

Nom GEOFÀCT INC. Date : 04/12/90 Adresse: 127-D, 8e Rue Projet: 1997

Rouyn-Noranda (Quebec) J9X 2A5

Attention de M. Joel Scodnick

Echant. Pt ppb

Pd ppb

17664 16 < 6 17665 153 179 17666 < 6 28 17667 222 230 17668 8 < 6

17669 < 6 < 6 1767U < 6 < 6 17671 12 115 17672 < 6 < 6 17673 < 6 < 6

Les resultats des echantillons ci-dessus sont certifies

Pq .4/

1R4 Princinale: Ste-Germaine JOZ 1 M0 Tél. et fax: (8191 787-6116

~, .. 1//.4////.:////,:..

TECHNI-LAB abitibi inc.

CERTIFICAT D'ANALYSE

Nom •c4EOFACT INC. Adresse: 127-D, 8e Rue

Rou;n-Noranda (Quebec) J9X 2A5

Attention de M. Jcoel Scodnick

Date : 30/11/90 Projet: 1997

HAUTES VALEURS DE PLATINE

Echant. S. A. A. avec fournaise au graphite. Pt (PPb)

S. A. A. avec flamme

Pt (ppb)

g 17636 125 150

17643 136 170

17651 160 150

17660 362 370

HAUTES

VALEURS DE PALLADIUM

Echant. A. A. avec fournaise 3a au graphite.

Pd (ppb)

# 17637 187 210

17651 95 110

17663 188 147

Les res!.i lt.zts des echan ::i l lons ci-dessus sont certif ieS p a r

184• Principale. Ste-Germaine JOZ 1 MO

S. A. A. avec flamme

Pd (ppb)

DATE 31-AUG-90 CERTIFIE PAR Bernard Maurette, Directeur de Laboratoire

Membre du Groupe SGS (Société Générale de Surveillance)

XRA.L

LES LABOR ATOIRES XRAL UNE (;IVISION DES SEk....ES DE SURVEILLANCE SGS INC.

150, '13e RUE • ROUYN-NORANDA • QUEBEC J9X 2H6 TEL: (819)764-9108 FAX: (819)764-4673

C E12Œ' F' 3` CA.T D ANALY S E

1221A.PPCDRT 1NTo g2 S a.

A: GEOFACT INC.(MINORCA) ATTN: J. SCODNICK 127-D, 8E RUE ROUYN-NORANDA, QUEBEC J9X 2A5

CLIENT No. 1987

DATE DE RECEPTION 10-Aug-90

REF. DOSSIER 455-G3 No de Pages 3

11 CONCASSES Proj. NICOBI

ELEMENTS METHODE LIMITE DE DETECTION AU-1AT OZ/TON FA 0.001 AU-1AT G/MT FA 0.03 WRMAJ % WR 0.01 CO % XRF 0.01 NI % XRF 0.01 CU % XRF 0.01 WRMIN PPM WR 10. RH PPB FAPMS 1. PD PPB FADCP 1. AG-1AT OZ/TON FA 0.01 AG-1AT G/MT FA 3. PT PPB FADCP 10.

519

NI %

Ref. Dossier

CU X RH PPB

455-s.

PD PPB

Page 1 de 3

AG-1AT OZ/TAG-1AT G/MT PT PPB

1.18 0.49 28 140 <0.01 <3.0 74 0.57 0.62 16 38 <0.01 <3.0 14 1.66 1.53 35 115 <0.01 <3.0 24 0.52 0.25 12 74 <0.01 <3.0 49 1.12 0.34 26 48 <0.01 <3.0 42

1.07 0.61 24 120 <0.01 <3.0 50 0.76 0.56 15 62 <0.01 <3.0 29 1.82 0.06 19 86 <0.01 <3.0 49 0.14 NIL

<0.01 <3.0

NIL 0.04 <0.01 <3.0

XRAL 31-AUG-90 R.., r0RT R

Numero AU-1AT OZ/TAU-1AT G/MT CO X

NIC-01 0.001 0.05 0.04 NIC-02 0.002 0.08 0.02 NIC-03 0.001 0.05 0.04 NIC-04 0.004 0.12 0.01 NIC-05 0.001 0.05 0.04

NIC-06 0.007 0.24 0.03 NIC-07 0.002 0.08 0.02 NIC-08 0.003 0.09 0.03 NIC-09 -- -- 0.01 NIC-10 <0.001 <0.03 --

NIC-11 0.001 0.03

AU-1AT OZ/T- ASSAY PERFORMED ON 30 GRAM ALIQUOT AU-1AT G/MT- ASSAY PERFORMED ON 30 GRAM ALIQUOT AG-1AT OZ/T- ASSAY PERFORMED ON 30 GRAM ALIQUOT AG-1AT GAT- ASSAY PERFORMED ON 30 GRAM ALIQUOT

LES LABORATOIRES XRAL 150, 13e RUE ROUYN-NORANDA QUEBEC J9X 2H6 TEL (819)764-9108 FAX: (819)764-4673

Analyses de Roches En..dres (XRF) 31-AUG-90 RAPPORT R 519 .ef. Dossier 455 PAGE 2 de

NA20 K20 FE203 MNO TI02 P205 CR203 LOI totaux Numero \ % SI02 AL203 CAO MGO

NIC-09 37.0 3.16 0.95 33.8 0.11 <0.01 11.1 0.17 0.17 0.03 0.42 11.9 98.8

Les totaux des analyses de roches entieres incluent tous les elements determines, calcules comme oxydes.

LES LABORATOIRES XRAL 150, 13e RUE ROUYN-NORANDA QUEBEC J9X 2116 TEL: (819)764-9108 FAX: (819)784-4673 Membre du Groupe'`SGS (Société Générale de Surveillance)

XRAL Analyses de Roches En..1eres (XRF) 31-AUG-90 RAPPORT R 519 .ef. Dossier 455 PAGE 3 de

Nunero \ PPM RB SR Y ZR NB BA

NIC-09 17 22 <10 <10 11 45

LES LABORATOIRES XRAL 150, 13e RUE ` ROUYN-NORANDA QUEBEC J9X 2N6 ` TEL (819)764-9108 FAX: (819)764-4673 Membre du Groupe SGS (Société Générale de Surveillance)

C / P.O. 550 148. AVENUE PERREAULT VAL D'OR (QUEBEC) J9P 4P5 TEL.: (819) 824-433: FAX: (819) 824-474e

BOURLAMAQUE ASSAY LABORATORIES LTD.

CLAUDE CHOCINARD CERTIFICAT D'ANALYSES

CERTIFICATE OF ANALYSIS

LT-001 54880 A N°

ÉCHANTILLONS VAL D'OR (QUÉBEC)

le 6 juin 19

Roche SAMPLES

REÇU DE RECEIVED FROM 1 Ag ANALYSES

ASSAYS

Echantillon: Rock chip

Ag oz/ton: 0.17

Ag q/tonne: 5.83

CERTIFICAT D'ANALYSES

CERTIFICATE OF ANALYSIS

N° 54880

CLAUDE CHOUINARD

LT-001

C. P. / P.O. 550 148, AVENUE PERREAULT VAL D'OR (QUEBEC) J9P 4P5 TEL.: (819) 824-433 FAX: (819) 824-474

BOURLAMAQUE ASSAY LABORATORIES LTD.

ECHANTILLONS Roche le 6 juin 9C SAMPLES VAL D'OR (QUEBEC) 19

RECEIVED FROM ASSAYS 1 Au/Pt/Pd, 1 Ag, 1 Cu, 1 Zr 1 Co, 1 Ni

REÇU DE

Echantillon: Rock chip

Au oz/ton: N.D.

Pt oz/ton: N.D.

Pd oz/ton: 0.008

Ag g/tonne: to follow

Cu

Co

Ni

For Au, Pt & Pd N.D. means less than 0.002 oz/ton. For base metals N.D. means less than 0.001% For Ag N.D. means less than 1.0 g/tonne.

%: 2.34

%: 0.037

%: 1.24

ANALYSTE I 'A

N° 34731

5 Au/Pt/Pd, 5 Ag, 5 Cu, 5"Co, 5-Ni

REÇU DE ANALYSES RECEIVED FROM ASSAYS

C. F. i P.O. 550 148, AVENUF PERREAULT VAL D'OR (QUEBEC) J9P 4P5 TEL.: (819) 824-4337 FAX: (819) 824-474e

BOURLAMAQUE ASSAY LABORATORIES LTD.

CLAUDE CHOLINARD

LT-001

ÉCHANTILLONS Roche SAMPLES

CERTIFICAT D'ANALYSES CERTIFICATE OF ANALYSIS

VAL D'OR (QUEBEC) le 23 mai 19

4201 4202 4203 4204 4205

0.003 0.004 0.003 N.D. N.D.

N.D. N.D. N.D. N.D. N.D.

N.D. 0.003 N.D. 0.003 0.003

2.0 2.0 2.0 N.D. N.D.

0.785 0.595 0.620 0.214 0.420

0.004 0.003 0.003 0.001 0.001

Co o: 0.009 0.039 0.009 0.008 0.019

Ni %: 0.090 0.790 0.220 0.240 0.520

For Au, Pt & Pd N.D. means less than 0.002 oz/ton. For base metals N.D. means less than 0.001% For Ag N.D. means less than 1.0 g/tonne.

Echantillon:

Au oz/ton:

Pt oz/ton:

Pd oz/ton:

Ag g/tonne:

Cu %:

Zn %:

ANALYSTE l ASSA

LETTER TO THE LEGAL DEPT., MER.

r7FPENDIX 9

MINORCA RESOURCES LTD 1218.6th Street. P.O. Box 1728 Val d'Or. Quebec, Canada, J9P 5Y9

RESSOURCES MINORCA LIÉE 1218.6• Rue. C. P. 1728 Val d'Or. Québec, Canada. J9P 5Y9

;1ti~~J 1~ti7

. ,k, •~

Exploration Office / Bureau Exploration (819) 762-3158

Head Office / Siègo Social (819) 825-7033

fax (819) 825-6394

1ORC MINISTERE DE L'ENERGIE ET DES RESSOURCES Service des Contentieux 5700, 4e avenue Ouest Niveau 1 Charlesbourg (Quebec) G1H 6R1

November 14, 1991

Re.: NICOBI LAKE PROPERTY, LE TAC TOWNSHIP, QUEBEC.

To The Minister,

This letter is to inform you that Domtar (of Quevillon) has slashed (clear cut) certain areas of Le Tac township, Quebec. Commercial lumber was cut within the limits of our property (see attached map). The claim posts, which were spray painted with fluorescent paint and flagged were clearly visible and were marked this way, hoping that Domtar would leave them in place. However, the claim posts which were in the slashed areas were destroyed and are not in their respective places. I am informing you of the situation so as to deter any legal dispute that may arise from this situation.

Sincer ly,

Joel Scodnick, B.Sc., President

MINORCA RESOURCES LTD./ RESSOURCES MINORCA LTEE.

NICOBI LAKE PROPERTY/ PROPRIETE LAC NICOBI SCALE / ECHELLE 20,000 OEOFaCT liNCo CARTE DE CLAIMS

APPENDIX 10

PRESS RELEASES

IN OR PRESS RELEASE

MINORCA RESOURCES LTD 1218. 6th Street. P.O. Box 1728 Vol d'Or. Quebec. Canada. J9P 5Y9

RESSOURCES MINORCA LIÉE 1218.6• Rue, C.P. 1728 Val d'Or. Québec. Canada. J9P 5Y9

NOVEMBER 23,‘1990 VSE TRADING SYMBOL: MYR

MASSIVE SULPHIDES ENCOUNTERED IN DRILL HOLE NYC-90-1 ON THE NICOBI LARE PROPERTY

Exploration Office / Bureau E,plara:o n (819) 762.3158

Head Office / Siege Social (819) 825.7033

fax (810) 825.394

An impressive 42.7m wide copper-nickel (Cu-Ni) sulphide zone has been encountered in drill hole #NIC-90-1. Disseminated sulphides, stringers, semi-massive and massive sulphides dominate the first 42.7m of this section. From 42.7m to 78.7m, the gabbro is mineralized with 3-15% Cu-Ni sulphides (ave.: 3-5%) until the lower contact is reached with the granite. This showing had been previously probed by diamond drilling in the early 1960's but the core had only been analyzed for copper and nickel; massive sulphides as have been found now have not been discovered in the past. A brief description of the core follows:

0 - 10.3m: 3-40% Cu-Ni sulphides (ave.: 10-15%). 8.5 - 10.0m: Cu-rich zone with 10-12% chalcopyrite locally.

10.3 - 22.2m:5% disseminated Cu-Ni sulphides. 22.2-23.Om:MASSIVE SULPHIDES: 55% Cu sulphides and 25% Ni sulphides. 23.0 - 25.8m:3-5% disseminated Cu-Ni sulphides. 25.8 - 28.8m: MASSIVE SULPHIDES: up to 90% sulphides (ave.: 55-60%),

mainly Ni sulphides. 28.8 - 42.7m: 3-15% disseminated Cu-Ni sulphides, (ave.: 5%). 42.7 - 78.7m: 3-15% Cu-Ni sulphides (ave.: 2-3%).

Sampling during this summer returned copper values up to 1.53%, nickel as high as 1.82%, cobalt up to 0.04% and palladium up to 140 ppb (see press releases of June 15 & August 20, 1990). The samples will be analyzed for copper-nickel-cobalt-silver-gold-zinc-platinum-palladium & rhodium. The core is presently being split and should be in the lab by this week-end,with results being available by sometime next week. The Nicobi Lake Property is located in Le Tac township about 30 km east of VSM's Grevet deposit which hosts some 10 million tons of copper-zinc-silver ore. The open pit potential of the Nicobi property is what makes it so attractive. It appears quite evident that the Quevillon base metal camp is shaping up to be Quebecs next biggest play, where exploration has become very active. Minorca's directors are contemplating in which way they will proceed in order to raise funds for further drilling on the Nicobi property and to commence a drilling campaign on Santa Anna. A private placement in Quebec is most likely.

ON BEHaLF:O.F THE BOARD OF DIRECTORS, ,

_...✓ Y;~ JOEL SCODNICK, B.Sc., Geologist President, Director

The information contained herein has neither been approved nor disapproved by the regulatory authorities of the

OR

NOVEMBER 30, 1990 VSE TRADING SYMBOL: MYR PRESS RELEASE

HIGH GRADE COPPER AND NICKEL VALUES RETURNED ON THE NICOBI LAKE PROPERTY, QUEBEC

MINORCA RESOURCES LTD 1218. 6th Street. P.O. Box 1728 Val d'Or. Quebec. Canada. J9P 5Y9

RESSOURCES MINORCA LTÉE 1218.6' Rue, C.P. 1728 Vol d'Or. Québec. Canada. 49P 5Y9

A recently completed 'drill hole on the Nicobi Lake property has returned some spectacular assays. Massive sulphide sections have returned up to 14.9% copper (Cu), 6.96% nickel (Ni), 0.10% cobalt (Co), 0.02% zinc (Zn) and 277 ppb gold (Au). Only the first batch of results are in from the lab which represent the first 39.01m. Assays for the balance of the hole are expected shortly, and these will include samples that have been assayed for platinum and palladium. From 1.40m to 39.01m (a core length of 37.61m), the section averages 0.75% Cu and 0.89% Ni. A detailed description of this section follows:

DDH #

NIC-90-1 incl. incl.

incl.

incl. incl. incl: incl. incl. incl. incl. incl. incl.

The most impressive massive sulphide zone from 25.83m to 29.49m (core length of 3.66m) assayed 1.37% Cu, 4.39% Ni & 0.06% Co. The true width of the 37.61m wide zone is assumed to be about 26m, or about 2/3 of the length of the section.

The Nicobi Lake property appears to to situated at the eastern extension of the Cameron deformation corridor which measures from 500m to 4km wide. We feel that this rather wide deformation zone may be responsible for the mineralization found on the property. The property has been worked in the late 1950's and early 1960's and has only been explored for copper'and nickel. Based on the results so far obtained, the chances of bringing this property into an open pit operation are very good. The president is presently speaking to several majors and financing firms in order to raise funds to further explore and develop the p operty.r _

ON BEHALF OF THE

Exploration Office / Bureau Exploration (819) 762-3158

Head Office / SiéAe Social (819) 8257033

FROM (m)

TO (m)

CORE Cu (%)

Ni (%)

Co +(%) LENGTH (m)

1.40 39.01 37.61 0.75 0.89 3.77 37.20 33.43 0.81 0.98 3.77 9.83 6.06' 0.42 0.75 0.02

13.16 19.00 5.84 0.14 1.07 17.24 17.77 0.53 0.07 6.96 0.10 21.70 37.20 15.50 1.48 1.38 0.02 22.20 23.02 0.82 14.90 2.34 0.03 25.83 26.83 1.00 2.15 4.05 0.06 26.83 27.83 1.00 0.30 5.59 0.07 27.83 28.83 1.00 0.19 5.75 0.07 28.83 29.49 0.66 3.60 1.02 0.02 31.18 32.00 1.18 3.17 0.27 33.22 33.77 0.55 0.11 0.84 0.05 35.97 36.60 0.63 0.06 0.50 0.01 36.60 37.20 0.60 0.25 1.24 0.02

Fox (810) 825-6394

BOARD OF DIREC:'ORS

The information contained herein has neither been approved nor

JOEL SCODNICK, B.Sc.,,Geologist President, Director

NOR~- ...

s~ r•

7~'

PRESS RELEASE DECEMBER 04, 1990 VSE TRADING SYMBOL: MYR

MINORCA RESOURCES LTD 1218.6th.?treet. P.O. Box 1728 Val d'Or. Quebec. Canada. J9P 5Y9

RESSOURCES MINORCA LTÉE 1218, 6• Rue. C. P. 1728 Val d'Or. Québec. Canada. J9P 5Y9

High concentrations of platinum (Pt) and palladium (Pd) have been returned in fourteen out of thirty-nine drill core samples remitted to the lab. The Pt & Pd concentrations are associated with the high copper-nickel-cobalt values which were made public in the last news release of November 30, 1990, which included values as high as 14,9% Cu, 6,96% Ni, 0,10% Co and 0,28g/t Au. Only one hole was drilled to a depth of 107.02m, in"'order to test the sulphide deposit for platinoids, cobalt and base metals. The following intersections for Pt & Pd were obtained from DDH #NIC-90-1:

FROM (m)

TO CORE LENGTH(m)

2.28 3.77 .1.49 3.77 4.50 0.73 4.50 5.50 1.00 9.33 9.83 0.50 13.16 14.68 1.52 17.24 17.77 0.53 22.20 23.02 0.82 25.83 26.83 1.00 26.83 27.83 1.00 27.83 28.83 1.00 28.83 29.49 0.66 ' 31.18 32.00 0.82 33.22 33.77 0.55 36.60 37.20 0.60

0.12 0.10 0.03 0.19 0.06 0.14 0.12 0.28 0.04 0.11 0.15 0.10 Pending Pending 0.36 0.60 0.03 0.19 0.01 0.13 0.10 0.19 0.15 0.18 0.22 0.23 0.01 0.12

Pt • Pd (a/t) .(q/t)

It appears at this stage, according to old drill data from the 1950's and 1960's that there is a high grade ore shoot which begins at the surface and could be followed to a depth of at least 100m. The deposit is open along strike and at depth and is apparently getting wider. It also appears that we are looking at mineralized zone measuring from 40m to over 60m wide. The

addition of Pt & Pd in the mineralized system makes this quite a unique deposit in the Quebec region and war-rants much more work.'

Exploration Office / Bureau Exploration (819)762-3158

ON BEHALF OF THE BOARD OF DIRECTORS

`~ i)

Head Office / Siègo Social (819) 825-7033

JOEL SCODNICK; B.Sc. , Geologist President, Director

THE INFORMATION CONTAINED HEREIN HAS NEITHER BEEN APPROVED NOR D 3APPROVED BY THE REGULATORY AUïHORItiES OF THE PROVINCES OF BRITISH COLUMBIA OR QUEBEC.

Fox (819) 8251394

PLATINUM AND PALLADIUM VALUES RETURNED ON THE NICOBI LAKE PROPERTY, QUEBEC .

MI ORCA PRESS RELEASE1 December 6, 1990

VSE TRADING SYMBOL: MYR

fax (B 19) 8256394

NEW PLATINUM, PALLADIUM & SILVER ASSAY RETURNED ON THE NICOBI LAKE PROPERTY, QUEBEC

MINORCA RESOURCES LTD 1218. 6th Street, P.O. Box 1728 Vol d'Or. Quebec. Canada, J9P 5Y9

RESSOURCES MINORCA LIÉE 1218.6 Rue, C: P. 1728 Val dOr. Québec. Canada, J9P 5Y9

Previous sampling of drill hole # NIC-90,1 has returned some encouraging platinum and palladium values associated with high grade copper and nickel zones within a gabbroic intrusion which is well mineralized for the first 42m and slightly mineralized for the next 36m (see Press Releases of 30-1'1-90 & 4-12-90). Up to now, the best Pt value returned was 0.36g/t and 0.60 Pd in a massive sulphide zone. Sample # 17656 has returned 0.82m of 14.9% Cu, 2.34% Ni, 0.03% Co, 0.078/t Au, 0.02% Zn. This copper-nickel enriched zone also contains 1.05g/t Platinum, 1.08g/t Palladium and 26g/t Silver. This recent assay represents a discovery of precious metals associated with the base metals and is making Nicobi into a very attractive deposit. In terms of dollar value, sample # 17656 would be worth about $565/ton. Previous drilling, along with hole # NIC-90-1 indicates that the. mineralized zone is 27m wide on surface, 45m wide (depth of 23m) at 11+24mE, 52m wide (depth of 32m) at 11+10mE, 45m wide (depth of 40m) c 10+95mE, 70m vide (depth of 80m) at 10+86mE, 30m wide (depth of 70m) at 10+49mE.

It seems obvious at this stage, assuming that the zone is near vertical, that it is getting wider at depth and the system is open in all directions. Project geologist Graham Long feels that the high grade zones parallel the granitic contact which dips at about 580 to the west and may represent remobilized, ore. The longitudinal section which is now complete, shows that the, zone can be followed for 100m along strike and to a depth of 115m.

ON BEHALF OF THE BOARD OF DIRECTORS

THE PROVINCES OF BRITIS

CONTAINED COL M A

HEREIN HAS NEITHER BEEN APPROVED NOR DISAPPROVED BY THE REGULATORY AUTHORITIES OF THE

Exploration Office / .* Bureau Exploration (819) 762.3158 A

• "

Head Office / Siège Social (819) 825-7033

Fax (819) 825-6394

PRESS RELEASE

MI NORCA APRIL 30. 1991 'ISE TRADING SYMBOL: MYR

MINORCA RESOURCES LTD 1218. 6th Street. P.O. Box 1728 Vol d'Or, Quebec. Canada, J9P 5Y9

RESSOURCES MINORCA LIÉE 1218, 6• Rue; C. P. 1728 Val d'Or. Québec. Canada..19P 5Y9

MINORCA HITS WIDE INTERSECTIONS ON THE NICOBI LAKE BASE METAL PROPERTY

LE TAC TOWNSHIP, QUEBEC

Two diamond drill holes of a twelve hole program consisting of 915 metres are being logged and sampled for base metals and platinum group metals. Hole# NIC-91-2 intersected a mineralized zone measuring 35.48 metres wide, including three distinct massive sulphide zones measuring 4.7m, 0.39m & 0.36m respectively. The entire zone is comprised of disseminated nickel and copper sulphides, stringers and massive sections.

Hole# NIC-91-3 was drilled underneath hole #2, and intersected three distinct mineralized sections measuring 26.5m, 11.0m & 6.0m respectively. These zones are an extension of hole #2 which was drilled in order to show the depth potential. Previous results from last years program revealed high grade nickel values of 6.96%, 14.9% Cu, 0.10% Co, 26 g/t Ag, 1.05 g/t Pt & 1.08 g/t Pd. Results are pending and wi'l become public very shortly. This diamond drill program is being conducted in order to further define this "A" ZONE at depth and along strike. According to Minorca's geologist, the "A" ZONE ap?ears to be hosted within a tabular leralized gabbro. These two holes were drilled through and beyond a known zone that was previously tested to a depth of 35m, for copper and nickel back in the late 1950's and early 1960'2. Our ,risual inspection of the core shows that the zone continues down to 70m vertical and is open at depth. It should also be noted that the mineralization from hole #2 comes in at about 24m and from hole #3 at 20m, again showing the open pit potential.`

ON BEHALF OF THE BOARD OF DIR.ECTOR'S >

J(iel Sc nick, B.Sc., Geologist President; Director

NFRÉG TÂ~R~ÂTRiËSFTÉPVCSF ÔL IB~Â ~BY THE REGULATORY PROVIDED

Ô H NEITHER BEEN

Ô BRITISH NOR DISAPPROVED

.

MINORCA RESOURCES LTD 1218, 6th Street. P.O. Box 1728 Vol d'Or, Quebec. Canada, J9P SifS'

RESSOURCES MINORCA LTÉE 1218.6• Rue. C. P. 1728 Vat d'Or. Québec. Canada..19P 5Y9

ORC [DREW RELEASE Wednesday, May 8, 1991

VSE Trading Symbol: MYR

NEW BASE METAL DISCOVERY ON THE NICOBI LAKE PROPERTY LE TAC TOWNSHIP, QUEBEC

3

Substantial amounts of copper-nickel sulphides with an appreciable amount of cobalt are present in the first two holes that were drilled and assayed. The first hole (NIC-91-2) drilled at -45 degrees intersected a mineralized zone from 7.00m to 59.97m and measured 52.97m wide (52m true width)._The second hole (NIC-91-3) drilled at -65 degrees intersected a mineralized zone from 12.64m to 80.26m and measured 67.62m wide (57m true width). Both of these holes were drilled to the south and were located approximately 20m north of the surface showing.

head Office Siege Social (819) 82E-7033

Exploration Office / Bureau Exploration (819) 762-3158

Fax (819) 825-6394

Cu Ni $./TON 7i0 INTERVAL

25.67m 1.49rr: 0.38% 0.67% 0.02% $80 25.67m 0.67m 1.62% ` 0.81% 0.02% $10f$

37.23m 4.70m 0.73% 3.94% 0.09% $362 33.45m 0.36m 0.36% 3.09% 0.08% $282 34.10m - 0.65m PENDING 34.85m 0.75m 0.44% 3.95% 0.07% $351 35.05m 0.20m 6.21% 2.45% 0.04% $350 35.31m 0.26m 0.78% 3.78% 0.06% $342 36.40m: 1.09m 0.86% 5.33% 0.16% $502 37.23m 0.83m 0.46% 6.46% 0.10% $564

45.39m : 4.05m 0.24%, 0.46% ',0.01% $46

Two new mineralized zones were discovered, the "B" Zone which was intersected at a vertical depth of about -32m in hole #2 and at a vertical depth of -50m in hole #3, and the "C" Zone was intersected in hole #3 at a vertical depth of about -60m. Disseminated sulphides, stringers, semi-massive and massive sulphides have been discovered in the first two drill holes. All of the samples are presently being assayed for copper, nickel and cobalt for the other holes, however, a good portion of these will be re-assayed for gold, silver, platinum, palladium and rhodium.

All three zones ("A", "B" & "C") are open along strike and at depth. It has been determined so far that the three high grade zones are hosted within a tabular orebody striking in an east-west direction and dipping at about 55 degrees to the north. Previous drilling on the "A" Zone outlined a cylindrical orebody with only limited dimensions. Our drill holes ha-:e shown us quite a different picture such that the "A" Zone is increasing in size with depth and that other parallel zones exist. An operating cost for an open pit mine is in the range. of $40/ton and all of the zones so far delineated are above this figure. The following assays have been returned for drill hole# NIC-91-2

FROM

24.18m incl. 25.00m

32.53m incl. 32..53m incl. 33.45m incl. 34.10m incl. 34.85m incl. 35.05m incl. 35.31m incl. 36.40m

41.34m

"A" ZONE

46.17m 46.75m 0.58m 0.29% 0.88% 0.02% $84

48.00m 50.42m 2.42m 0.28% 1.74% 0.04% $159 48.00m 48.35m 0.35m 0.29% 3.50% 0.08% $314 48.35m 49.26m 0.91m 0.47% 1.77% 0.03% $163 49.26m 49.61m 0.35m PENDING 49.61m 50.42m 0.81m 0.19% 1.71% 10.05% $158

51.38m 52.65m 1.27m 0.32% 1.32% 0.03% $123

54.10m 54.44m 0.34m 0.91% 0.46% G.01% $61

55.37m 56.40m 1.03m 0.97% 0.69% 0.01% $81 55.37m 55.73m 0.36m 2.18% 1.17% 0.02% $150 55.73m 56.40m 0.67m 0.32% 0.43% 0.01% $45

/2

incl. incl. incl. incl.

incl. incl.

"B" ZONE

`C" ZONE

57.53m 57.95m 0.42m 0.18% 0.39% 0.02% $41

58.96m 59.66m 0.70m 0.23% 0.68% 0.03% $69 -

The following assays have been returned for drill hole #NIC-91-3:

FROM TO INTERVAL Cu Hi Co $/TOH

30.14m 42.00m 11.86m 0.21% 0.51% 0.02% $52 incl. 33.00m 33.80m 0.80m 0.48% 2.48% 0.06% $230

incl.

55.50m 58.00m 2.50m 0.14% 0.75% 0.03% $73

57.34m 58.00m 0.66m 0.15% 1.24% 0.04% $114

70.50m 72.20m 1.70m 0.25% 1.14% 0.02% $104 incl. 70.50m 71.20m e3.70m 0.70% 0.34% 04040o8$78 incl. 71.20m 71.70m 0.50m 0.12% 2.28% 0.04% $200

"A" ZONE

`B" ZONE

"C` ZONE

Several infill samples are pending for both holes and will be mentioned in a subsequent press release. It should be noted that the three zones mentioned are characterized by heavy sulphide concentrations and the areas in between contain disseminated suphides. The "A" Zone measures from 3.5m to 13m wide, the "B" Zone measures 8m to 9m wide and the "C" Zone measures 6m to 7m wide.

Drill holes #NIC-91-4 & 5 were collared about 12m to the east and are presently being logged and split for assay. Hole 44 intersected a mineralized zone from 7.00m to 57.62m. Very similar mineralization is present in this hole, with some sections containing as much as 30% of copper-nickel sulphides. Hole #NIC-91-5 intersected mineralized zones from 13.44m to 51.00m. Heavy sulphide concentrations occLi from 23.79m to 51.00m, with concentrations of up to 40% of copper-nickel sulphides.

ON BEHALF OF THE BOARD OF DIRECTORS

THE INFORMATION CONTAINED HEREIN HAS NEITHER BEEN APPROVED NOR DISAPPROVED BY THE REGULATORY AUTHORITIES OF THE PROVINCES OF BRITISH COLUMBIA OR QUEBEC.

MINORCA RESOURCES LTD 1218. 6th Street. P.O. 8ox 1728 Vol d'Or. Quebec. Canada. J9P 5Y9

RESSOURCES MINORCA LIÉE 1218.6• Rue, C. P. 1728 Val d'Or. Québec. Canada. J99 5V9

i

r`~. { _ ` . ti: . 5., '~~;.ORCA

pREZZ RELEASE Thursday, May 16, 1991 VSE Tracing Syrrlbot MYR

WIDE COPPER-NICKEL ZONES INTERSECTED

N/COBI LAKE PROPERTY, LE TAC TOWNSHIP, QUEBEC

Exploration Office / '. Bureau Exploration (819) 762-3158

Head Office / Siége Social (819) 825-7033

Fax (819) 825-6394

A layered gabbroic complex has been identified on the Nicobi Lake property which comprises up to three base metal zones, being more or 'less parallel. Extensive widths up to 36.88m (121') containing economic grades for copper, nickel & cobalt hava been returned for the first five drill holes. Hole #NIC-91-2 returned 36.88a (121') of 0.29Z Cu, 0.84% Ni & 0.03% Co and hole #NIC-91-6 which is located about 11.2m (36.7') west of hole#2 returned 31.66m (103.9') of 0.35Z Cu, 0.73% Ni & 0.02% Co including 24.15m (79.2') of 0.36% Cu, 0.90% Ni & 0.02% Co for the "A" Zone. The "B" Zone was intersected and raturned 7.2m (23.6') of 0.26% Cu, 1.00% Ni & 0.02% Co. The "C" Zone returned 4.15 (13.6°) of 0.11% Cu, 0.46% Ni & 0.01% Co. Hole #'s NIC-91-4 & 5 are collared Ilm (36') east of hole #2 & 3. Hole #'s NIC-91-7 & 8. are presently being logged and split. Hole #7 was collared from the same location as #6 but drilled at -70 degrees in order to intersect the down dip extension. Hole #7 is mineralized from 15m (49.2') to 78.08m (256.2'), and hole #8 is mineralized from 11.00m (36.1') to 69.08m (229.0'). Both of these holes (#7 & #8) contain E ctions of disseminated, semi-massive and massive sulphides.

The drill core contains several distinct layers. The chances of finding a large tonnage deposit is much greater due to this layering. It should also be noted that the copper-nickel ore is of a primary origin and thus increases the chances tremendously for finding a big deposit. The true widths of the intersections shown below are approximately 80% - 90% of the core lengths.

Meanwhile, some prospecting has been conducted in the northwestern part of the property and a shear zone measuring 275m (900') wide has been discovered. The shear is located within an east-west striking quartz-muscovite-sericite schist and contains quartz veins with tourmaline and pyrite. This zone represents a good target area for gold mineralization and will be mapped in detail in the near future.

NIC-91-2

incl.

PIC-91-3

19.52m ( 64.0') to 56.40m (185.0'), 36.88m (121.0') of: 0.29% Cu. 0.84% Ni. 0.03% Co 32.53m (106.7')

( 98.9')

to 37.23m (122.2'),

to 42.00m (137.8'_),

4.70m

11.86m

(

(

15.5') of:

38.9') of-

0.73% Cu,

0.21% Cu.

3.94% Ni, 0.09% Co

Q.51% Ni.. 0.027 Co

HIC-91-4

30.14m 55.50m (182,1') to 5H- 00m C190,3'). 2.50m ( 8.2') o f: 0.147_ Cu, 0,75% Ni. 0.03% Co

~ 7 ' + ~~ " . : 0.25% CAL 1.14% Ni. 0.02% Co

( 23.0') to 24.00m C 78.7'), 17.00m ( 55.7') of: 0.17% Cu, 0.30% Ni. 0.01% Co incl.

HIC-91-5

7.00m 20.00m ..50

( 65.6') 185.4'

to 22.50m t• 57.6 n

( 73.8'), 189 '

2.50m „ ( 8.2') of:

.7' 0.22% Cu, 0.54% Ni, 0.02% Co

0

(101.7') to 33.00m (108.3'). 2.00m ( 6.6') of: 0.25% Cu. 0.42% Ni. 0.02% ro

incl.

HIC-91-6

31.00m 35.50ril (116.5') to 53.10tn C1 4.2'). 17.60m ( 57.7') of: 0.247 Cu. 0.46% Ni. 0.01% Co 36."Om (118.1')

42.1'

to 49.00m (160.8'),

to 44.50m 146.0

13.00m

31.66m

( 42.7') of:

9'

0.30% Cu,.0.57% Ni, 0.02% Co

0.35% Cu 0.737 0. ~

incl.

incl.

12.04m 20.35m .90m

( 66.8') (167.0')

to 44.50m to 58.10m

(146.0'), (190.6'),

24.15m 7.20m

( (

79.2') of: 23.6') of:

0.36% Cu, 0.261: Cu.

0.90% Ni, 0.02% Co 1.007. Ni. 0.02% Co

54.29m 63.95m

(178.1') (209.8')

to 58.10m to 68.10m

(190.6'), (223.4').

3.81m 4.15m

( (

12.5') of: 13.6') of:

0.39% Cu, 0.117 Cu.

1.62% Ni, 0.03% Co 0.4_6%14a. 0.01% Co

52 73

104

31 54 86

45 46 59

73 i 87 93

149 43

Joe N Scodnick,_B.Sc., Geologist President, Director

THE INFORMATION CONTAINED HEREIN HAS NEITHER BEEN APPROVED NOR DISAPPROVED BY THE REGULATORY AUTHORITIES OF THE PROVINCES OF BRITISH COLUMBIA OR QUEBEC.

FOR MORE INFORMATION, PLL,"SE CONTACT JOEL SCODNICK AT (819) 762-3158.

ON BEHALF OF THE BOARD OF DIRECTORS

S/tc

82 362

rho ..roc acnokonrievo D exec ^n!JTM'T

INORCA PRESS RELEASE VSEV~ SYMBOL_ MYR

6308m (207') WIDE COPPER NICKEL ZONE ON MCOB1 LE TAC TOWNSHIP, QUEBEC

MINORCA RESOURCES LTD 1218.6th Street. P.O. Box 1728 Val d'Or. Quebec. Canada, .1W 5Y9

RESSOURCES MINORCA LTÉE 1218.6' Rue. C. P. 1728 Vol d'Or. Québec. Canada. J9P 5Y9

A mineralized zone measuring up to 55m (180') wide (true width) comprised of copper and nickel sulphides with cobalt has been delineated so far on the property by a diamond drilling program. Drill hole #NIC-91-7 (drilled underneath #6) intersected a mineralized zone which measures 63.08m (207') wide grading 0.212 Cu, 0.42% Ni & 0.01% Co. The "A" & "B" Zones are shown below with nickel grading on average up to 0.74%. Drill holes #NIC-91-8 & 9 were drilled 11.2m (37') to the west. Because the base metal deposit is plunging about 55 degrees to the west, hole #8 failed to intersect significant values as it was drilled above the zone. Hole #9, however, drilled underneath #8 intersected both the "A" & "B" Zones. The "A" Zone intersected 14.17m (46.5') of 0.17% Cu, 0.59% Ni & 0.01% Co. The "B" 'Zone, which ended in mineralization returned 12.15m (39.9') of: 0.14% Cu, 0.58% Ni & 0.01% Co. In the "B" Zone, a very high grade intersection over 1.20m (4') returned 0.57% Cu, 3.98% Ni & 0.07% Co. This value represents the highest nickel and cobalt concentration ever discovered on the property at this vertical depth of 90m (295'). All of the higher grade intersections are comprised of disseminated sulphides, usually between 2-5%, semi-massive and massive sections. A detailed list of the assays are shown below.

Meanwhile, Minorca has just signed an option agreement today on a group of 15 claims located in Le. Tac township, just east and west of the Nicobi East property. An agreement has been submitted to the various regulatory authorities for approval. Minorca will remit 75,000 common shares upon approval and 50,000 common shares on the first anniversary date. Large angular boulders comprised of massive sulphides with 2-5% copper sulphides were found after making a short visit to the property. Outcrop containing massive sulphides were also discovered over a very strong geophysical anomaly which can be followed on Minorca's ground for four kilometres (2.5 mi). The samples will be sent to the lab today for assaying. Also, holes NIC-91-10, 11 & 12 have been logged and split and assays are pending.

1QC-91-7 8/ton

15.00m (49.2' )- 78.08m (256.2'), 63.08m (207') of: 0.21% Cu, 0.42% Ni, 0.01Z Co 38 incl. 34.00m (111.6') - 71.50m (234.6'). 37.50m (123.0') of: 0.24Z Cu, 0.53% Ni. 0.01% Co 48 incl. 34.00m (111.6') - 45.58m (149.5'). 11.58m ( 37.9') of: 0.32Z Ca, 0.7e,1'Ni. 0.02% Co 66 incl. 61.00m (200.1') - 71.50m (234.6'), 10.50m ( 34.5') of: 0.25% Cu, ü.67Z Ni. 0.01% Co 58

ffiC-91-8

40.00e (131.2') - 45.00m (147.6') -

EMC-91-9

40.50m (132.9'), 0.50m 47.50m (155.8'). 2.50m

1.7') of: 0.20Z Cu, 1.60% NJ. 0.032 co 130 8.2') of: 0.41% Cu, 0.50% Ni, 0.03% Co 54

Exploration Office / 4 Bureau Exploration (819) 762-3158 f?

Head Office / Siège Social â (819) 825-7033

Fax (8191825-6394

45.83m (150.4') - 60.00m (196.9'). 14.17m incl. 45.83m (150.4') - 46.65m (153.1'), 0.82m incl. 48.002 (157.5') - 49.50m (162.4'), 1.50m incl. 55.00m (180.5') - 57.00m (187.0'), 2.06m

86.17m (282.7') - 98.32m (322.6'). 12.15m incl. 86.17m (282.7') - 87.37m (286.7'), 1.20m

BOARD OF DIRECTORS

Joel Scodnicit, B.Sc., Geologist President, Director

46.5') of: 0.17% Cu. 0.59% Ni, 0.01% Co 50 2.7') of: 0.382 Cu, 1.05Z Ni. 0.02% Co 90 4.9') of: 0.31% Cu, 0.94% Ni. 0.02% Co 81 6.5') of: 0.16% Cu, 1.292 Ni, 0.04% Co 109 39.9') of: 0.14% Cu, 0.58% Ni, 0.01% Co 48 ; 4.0') of: 0.57Z Cu. 3.98Z Ni, 0.07Z Co 323

MINORCA Tuesday, July 16, 1991 VSE Trading Symbol: MYR PRESS RELEASE

ON BEHALF OF THE BOARD OF DIRECTORS

Joel Scodnick, B-.Sc., Geologist President, Director

Exploration Office / Bureau Exploration (819) 762-3158

iy

Head Office / Sege SocIol (819) 825-7033

Fax (819) 825-6394

T7£ INFORMATION CONTANED HEREId HAS NEM-E3:1 BEEN APPROVED NOR DISAPPROVED BY - i1-E REGULATORY ALTFIOAITES OF 71-E PROVINCES OF BPoTISH CAL.IIVBIA OR O(.JEEEC.

FOR MORE INFORMATION. PLEASE CONTACT JOEL SCODNCK CID 0319) 762-3158.

DOWNDIP EXTENSION INTERSECTED ON THE

NICOBI LAKE PROPERTY, QUEBEC

MINORCA RESOURCES LTD 1218. 6th Street. P.O. Box 1728 Vol dOr. Quebec. Canada, .19P 5Y9

RESSOURCES MINORCA LTEE 1218. &Rue. C. P. 1728 Val d'Or. Quebec. Canada. 19P S19

The downdip extension of the "A" Zone was intersected by drill holes NIC-91-11 & NIC-91-12 which were collared 25m (82') north of hole #2. Hole #2 returned 36.88m (121.01 ) of 0.29% Ca, 0.84% Ni & 0.03% Co (see press release of 16-05-91). Both of these holes ended in mineralization and will be extended in the next drill program. Hole #10 was collared too far north and did not intersect the high grade zones as it appears to be getting near vertical with depth, however, a mineralized zone measuring 31.50m (103.4') wide of low grade material was intersected. Hole #11 intersected a mineralized zone 52.28m (171.5') wide. The "A" Zone was intersected and returned 12.64m (41.5') of 0.31% Cu, 0.58% Ni & 0.02% Co ($58/ton). Within this zone, there is 1.50m (4.9') of 0.76% Cu, 1.35% Ni & 0.03% Co ($132/ton). Hole #12, which was just getting into the main zone was stopped as the program was ended, however, a mineralized zone 30.30m (99.4') wide was intersected. Within this zone, there was 19.54m (64.1') of 0.18% Cu, 0.22% Ni & 0.01% Co. Several assays are pending for gold, silver and platinum group metals, which are expected shortly.

Meanwhile, Minorca has been approached by a few companies regarding the possibility of a joint venture on the Nicobi Lake property. Minorca is presently seeking funding for the project to take it to the next stage of exploration.