4 DELHI DEVELOPMENT AUTHORITYMASTER PLAN SECTION , 6TH FLOOR,
VIKAS MINAR I NEW DELHI —110002
F. 1(4)/2013/MP I /3' Dated 18.04.2013
Sub: Minutes of the 4th Technical Committee Meeting held on 18.04.2013
The minutes of the meeting held on 0804,2013 have been put up for approval andthe same will be circulated to all the members shortly. The Chairman T.C. opined
that in future the draft minutes should be put up for approval immediately so that themembers of Technical Committee get sufficient times to submit their observations.
Item No.15I201
Modification in the layout plan of land measuring 32.75 Ha at Village
MahipalpUr
F3(4)2005/MP
The proposal was presented by the Director (Pig.) Zone ('F' & 'H). After detailed
deliberation, Technical Committee recommended the proposal as contained in Para
3 of Agenda for further processing for Change of Land Use under section 1 1 of
DD Act 1957 by Authority and MoUD.Action: Director (Pig) F&H, DDA
Item No.16/2013
Change of Land Use of land measuring 3522 sqm (0.35 Ha) from 'Recreationaluse Zone (Protected Forests) to 'Transportation' at Sport Complex, Hauz
Khas, R.K. Puram for construction of Janakpuri (West) - Botanical Garden -
Kalindi Kunj corridor of Delhi MRTS Project, Phase- III (Line-8).
F21(02)2013/MP
The proposal was explained by the Director (Pig) Zone ('F' & 'H'). The TechnicalCommittee recommended the proposal of Change of Land Use for the area measuring
"3522 sqm (0.35 Ha) from Recreational use Zone (Protected Forests) to
'Transportation' at Sport Complex, Hauz Khas, R.K. Puram for construction ofJanakpuri (West) - Botanical Garden - Kalindi Kunj corridor of Delhi MRTS Project,
Phase- Ill (Line-8)" for further processing under section hA of DD Act 957 by
Authority and MoUD.
Action: Director (Pig) F&H, DDA
Minutes of 401 Technical Committee meeting of 2013
Item No.17/2013
Change of Land Use of land measuring 3753.Osqm on permanent basis forconstruction of lIT Metro Station on Janakpuri (West) Kalindi Kunj corridor of
Delhi MRTS Project, Phase-Ill.
F21(13)2011/MP
The proposal was presented by the Director (AP-1) Zone 'F' & 'H'. The Technical
Committee approved the proposal for "Change of Land Use of land measuring
3753.Osqm on a permanent basis for construction of lIT Metro Station on Janakpuri
(West) Kalindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processing
under section 1 1A of DD Act 1957 by Authority and MoUD.
Action: Director (AP-11) F&H, DDA
Item No.1812013
Proposal of DTTDC Govt. of NCT of Delhi for construction of Delhi Haat for
East Delhi by covering Shandara Link Drain of Irrigation & Flood Department
along Noida Link Road at Mayur Vihar Ph-I
F20(1)93/MP
The proposal was explained by Director (Pig) Zone 'E' & '0'. A Power Point
Presentation was also made by Consultant, DTTDC. After detailed deliberation, theTechnical Committee recommended the proposal of DTTDC, Govt. of NCT ofDelhi, for construction of Delhi Haat for East Delhi by covering Shandara Link Drainof irrigation & Flood Department along Noida link road at Mayur Vihar Ph-I" ascontained in Para 3 of Agenda for Change of Land Use and for further processing
under section I 1 of DD Act 1957, by Authority and MoUD.Action: Director (Pig) E&O, DDA
Meeting ended with vote of thanks to the Chair.
(l.P. PARATE)
Director (MPR&T C)
Copy to:
1. Vice Chairman, DDA2. Engineer Member, DDA3. Finance Member, DDA4. Pr. Commissioner (LD)5. Commissioner (Pig)6 Commissioner (LD)7. Commissioner (LM)8. Commissioner (EDMC)9. Chief Planner, TCPO10. Chief Architect, HUPW ODA11. Chief Architect, NDMC12. Chief Engineer (Property Development). DMRC13. Chief Engineer (Elect.), DDA14. Chief Town Planner, SDMC15. Chief Eng. Director Project-I, DJB16. Chief Architect, DMRC17. Addl. Commr.(PIg.) (Infrastructure & UC)18. Addl. Comm r.(PIg.)TB&C DDA19. Addl. Commr.(Pl9.')UE&P, DDA20. AddI, Commr.(Pig.) AP & MPPR.21. Addl. Commr. (Landscape) DDA22. Director (AP-1) F&H, DDA23 Director (AP) E&O. DDA
Minutes of 4 th Technical Committee meeting of 2013
Annexure -A
*1st of participants of 4th meetin g for the year 2013 of Technical Committee on
18.042013DELHI DEVELOPMENT AUTHORITY
S/S h.IMs.
1. Abhay Shina, Engineer Member DDA
2. J.B. Kshirsagar Commissioner (Pig), DDA
3. Savita Bhandari, Addl. Commr (Landscape)DDA
4. P.M. Parate, Addl. Commissioner (TC&B), DDA
5. Dr. S.P. Bansal, Addl. Commissioner (Pig)-I, DDA
6. Ashok Ghodeshwar. ACA-11, (HUPW), DOA
7. Sandeep Mehta, Chief Engineer (Elect.). DDA8, I.P. Parate, Director. (Pig.)MPR& TO, DDA
9. Tapan Mondai, Director (Pig) AP (E&O)10. P.K. Bhera, Director (Pig) Zone F&H, DDA11 M.K. Verma, Dy. Director (AP) E&O12. Vijay Kumar, Engineer Member DDA
13. L&D.O.:Sunii Kumar Jam, Building Officer
14.NDMC:Rajeev Gupta, ArchitectP Dinesh, Sr. Town Planner
15.SDMC:R S. Nagar. Architect/ Town Planner
16.DTTDC:Vivek Band, Sr. Executive (SP)Pradeep Sachdeva, ConsultantA.K. Singh, Executive EngineerS.B.Gupta, Executive Engineer
17. DMRC:P.S. Chauhan Chief Engineer (G)Sanjeev Malik, Dy. Chief Architect (Land)H P. Mukhi, Manager (Land)P.S. Bisht, PM/LA
18.CPWD:Ashubsh Kumar Sngh, Asstt. Architect
19. Delhi Police:Satyavir Singh. Asstt. Commissioner of Traffic (E)
Minutes of 411, Technical Committee meeting of 2013
I DELHI DEVELOPMENT AUTHORITYMASTER PLAN SECTION , 6TH FLOOR,VIKAS MINAR, NEW DELHI - 110002
F. 1(4)/2013/MP I 1>1? Dated 18.04.2013
Sub: Minutes of the 4th Technical Committee Meeting held on 18.04.2013
The minutes of the meeting held on 08.04.2013 have been put up for approval andthe same will be circulated to all the members shortly. The Chairman T.C. opined
that in future the draft minutes should be put up for approval immediately so that themembers of Technical Committee get sufficient times to submit their observations.
Item No.15/201
Modification in the layout plan of land measuring 32.75 Ha at Village
Mahipalpur
F3(4)20051MP
The proposal was presented by the Director (Pig.) Zone ('F' & 'H'). After detaileddeliberation, Technical Committee recommended the proposal as contained in Para
3 of Agenda for further processing for Change of Land Use under section hA of
DO Act 1957 by Authority and MoUD.Action: Director (Pig) F&H, DDA
Item No.16/2013
Change of Land Use of land measuring 3522 sqm (0.35 Ha) from 'Recreationaluse Zone (Protected Forests) to 'Transportation' at Sport Complex, Hauz
Khas, R.K. Puram for construction of Janakpuni (West) - Botanical Garden -
Kalindi Kunj corridor of Delhi MRTS Project, Phase- Ill (Line-8).
F21 (02)201 3/M P
The proposal was explained by the Director (Pig) Zone ('F' & H'). The Technical
Committee recommended the proposal of Change of Land Use for the area measuring
3522 sqm (0.35 Ha) from Recreational use Zone (Protected Forests) to'Transportation' at Sport Complex, Hauz Khas, R.K. Puram for construction ofJanakpuri (West) - Botanical Garden - Kalindi Kunj corridor of Delhi MRTS Project,
Phase- Ill (Line-8)" for further processing under section hA of DD Act 957 by
Authority and MoUD.
Action: Director (Pig) F&H. DDA
Minutes of 41 Technical Committee meeting of 201 3
Item No.17/2013
Change of Land Use of land measuring 3753.Osqm on permanent basis forconstruction of UT Metro Station on Janakpuri (West) Kalindi Kunj corridor of
Delhi MRTS Project, Phase-Ill.
F21(13)2011/MP
The proposal was presented by the Director (AP-1) Zone 'F & 'H'. The Technical
Committee approved the proposal for "Change of Land Use of land measuring3753.Osqm on a permanent basis for construction of lIT Metro Station on Janakpuri
(West) Kalindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processing
under section hA of DD Act 1957 by Authority and MoUD.
Action: Director (AP-1) F&H, DDA
Item No.18/2013
Proposal of DTTDC Govt. of NCT of Delhi for construction of Delhi Haat forEast Delhi by covering Shandara Link Drain of Irrigation & Flood Department
along Noida Link Road at Mayur Vihar Ph-I
F 20(1 )93/MP
The proposal was explained by Director (PIg) Zone E' & '0. A Power Point
Presentation was also made by Consultant, DTTDC. After detailed deliberation, theTechnical Committee recommended the proposal of "DTTDC, Govt. of NOT of
Delhi, for construction of Delhi Haat for East Delhi by covering Shandara Link Drain
of Irrigation & Flood Department along Noida link road at Mayur Vihar Ph-I" ascontained in Para 3 of Agenda for Change of Land Use and for further processing
under section 1 1 of DO Act 1957, by Authority and MoUD.Action: Director (Pig) E&O, DDA
Meeting ended with vote of thanks to the Chair.'j
r(IF PAR E) -
hi
AnnexurA
ist of participants of 4th meeting for the year 2013 of Technical Committee on18.04.2013
DELHI DEVELOPMENT AUTHORITYS/Sh./Ms.
Abhay Shina, Engineer Member ODAJ.B. Kshirsagar Commissioner (Pig), DDASavita Bhandari, Addl. Commr (Landscape)DDAP.M. Parate, Addl. Commissioner (TC&B), DDADr. S.P. Barisal, Add(. Commissioner (Pig)-I, DDAAshok Ghodeshwar. ACA-11, (HUPW), DDASandeep Mehta, Chief Engineer (Elect). DDAI.P. Parate, Director. (Plg.)MPR&TC. ODATapan Mondal. Director (Pig) AP (E&O)P.K. Bhera, Director (Pig) Zone F&H, DDAM.K. Verma, Dy. Director (AP) E&OVijay Kumar, Engineer Member DDA
3. L&D.O.:Sunil Kumar Jam, Building Officer
14. NDMC:Rajeev Gupta, ArchitectP. Dinesh, Sr. Town Planner
15.SDMC:R.S. Nagar, Architect! Town Planner
16. DTTDC:Vivek Band, Sr. Executive (SP)Pradeep Sachdeva, ConsultantA K. Singh. Executive EngineerS.B. Gupta, Executive Engineer
17.DMRC:P.S. Chauhan Chief Engineer (G)Sanjeev Malik, Dy. Chief Architect (Land)H.P. Mukhi, Manager (Land)P.S. Bisht, PM/LA
18.CP\ND:Ashubsh Kumar Singh, Asstt. Architect
19. Delhi Police:Satyavir Singh, Asstt. Commissioner of Traffic (E)
1.2.3.4.5.6.7.8.9.101112
Minutes of 41h Technical Committee meeting of 2013
DELHI DEVELOPMENT AUTHORITYMASTER PLAN SECTION , 6TH FLOOR,VIKAS MINAR, NEW DELHI - 110002
F. 1(4)/2013/MP / Dated 18.04.2013
Sub: Minutes of the 4th Technical Committee Meeting held on 18.04.2013
The minutes of the meeting held on 08.04.2013 have been put up for approval and
the same will be circulated to all the members shortly. The Chairman T.C. opinedthat in future the draft minutes should be put up for approval immediately so that themembers of Technical Committee get sufficient times to submit their observations.
Item No.15/2013
Modification in the layout plan of land measuring 32.75 Ha at Village
Mahipalpur
F3(4)2005/MP
The proposal was presented by the Director (Pig.) Zone ('F' & 'H'). After detailed
deliberation, Technical Committee recommended the proposal as contained in Para
3 of Agenda for further processing for Change of Land Use under section hA of
DD Act 1957 by Authority and MoUD.Action: Director (Pig) F&H, DDA
Item No.16/2013
Change of Land Use of land measuring 3522 sqm (0.35 Ha) from 'Recreationaluse Zone (Protected Forests) to 'Transportation' at Sport Complex, Hauz
Khas, R.K. Puram for construction of Janakpuri (West) - Botanical Garden -Kalindi Kunj corridor of Delhi MRTS Project, Phase- III (Line-8).
F21(02)2013/MP
The proposal was explained by the Director (Pig) Zone ('F' & 'H'). The TechnicalCommittee recommended the proposal of Change of Land Use for the area measuring
"3522 sqm (0.35 Ha) from 'Recreational use Zone (Protected Forests) to'Transportation' at Sport Complex, Hauz Khas, R.K. Puram for construction ofJanakpuri (West) - Botanical Garden - Kalindi Kunj corridor of Delhi MRTS Project,
Phase- Ill (Line-8)" for further processing under section 1 1A of DD Act 957 by
Authority and MoUD.
Action: Director (Pig) F&H, DDA
14;1 ^n-lites of Wh Technical Committee meeti ng ot2013
Item N2.171201
L Change of Land Use of land measuring 3753.Osqm on permanent basis forconstruction of lIT Metro Station on Janakpuri (West) Kalindi Kunj corridor of
Delhi MRTS Project, Phase-Ill.
F21(13)201 1/MP
The proposal was presented by the Director (AP-1) Zone 'F' & 'H'. The Technical
Committee approved the proposal for Change of Land Use of land measuring3753.Osqm on a permanent basis for construction of liT Metro Station on Janakpuri
(West) Kalindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processing
under section 1 1A of DD Act 1957 by Authority and MoUD.
Action: Director (AP-1) F&H, DDA
Item No.18/2013
Proposal of DTTDC Govt. of NCT of Delhi for construction of Delhi Haat forEast Delhi by covering Shandara Link Drain of Irrigation & Flood Department
along Noida Link Road at Mayur Vihar Ph-I
F20(1 )93/MP
The proposal was explained by Director (Pig) Zone E & 0'. A Power PointPresentation was also made by Consultant, DTTDC. After detailed deliberation, theTechnical Committee recommended the proposal of "DTTDC, Govt. of NCT of
Delhi, for construction of Delhi Haat for East Delhi by covering Shandara Link Drainof Irrigation & Flood Department along Noida link road at Mayur Vihar Ph-I" ascontained in Para 3 of Agenda for Change of Land Use and for further processing
under section 1 1 of DD Act 1957, by Authority and MoUD.Action: Director (Pig) E&0, DDA
Meeting ended with vote of thanks to the Chair.
(IF. PARATE)Director (MPR&T C)
Copy to:
1. Vice Chairman, DDA2. Engineer Member, DDA3. Finance Member, DDA4. Pr. Commissioner (LD)5. Commissioner (Pig)a. Commissioner (LD)7. Commissioner (LM)8. Commissioner (EDMC)9. Chief Planner, TCPO10. Chief Architect, HUPW DDA11. Chief Architect, NDMC12. Chief Engineer (Property Development). DMRC13. Chief Engineer (Elect.). ODA14. Chief Town Planner, SDMC15. Chief Eng. Director Project-I, DJB16. Chief Architect, DMRC17. Addl. Commr.(Pig.) (Infrastructure & UC)18. Addl. Commr.(Pig.)TB&C, DDA19. AddI Commr.(Pig.)UE&P, DDA20. Add). Commr.(Pig.) AP & MPPR.21, Addl. Commr. (Landscape), ODA22. Director (AP-1) F&H, DDA23. Director (AP) E&O. DDA
Minutes of 4' Teclillical Committee meeting 0f 2013
Annexure -A
&.._ist of participants of 4th meeting for the year 2013 of Technical Committeei
18.04.2013DELHI DEVELOPMENT AUTHORITY
SIShJMs.
1 Abhay Shina, Engineer Member DDA
2. J. B. Kshirsagar Commissioner (Pig). DDA
3. Savita Bhandari, Addl. Commr (Landscape).DDA
4. P.M. Parate, Addl. Commissioner (TC&B). DDA
5. Dr. S.P. Bansal, Addl. Commissioner (Pig)-I, DDA
6. Ashok Ghodeshwar, ACA-'fl, (HUPW), DDA
7. Sandeep Mehta, Chief Engineer (Elect), DDA
8. I.P. Parate, Director (Plg.)MPR& TC, DDA
9. Tapan Mondal, Director (Pig) AP (E&O)10. P.K. Bhera, Director (Pig) Zone F&H, DDA11. M.K. Verma, Dy. Director (AP) E&O
12. Vijay Kumar. Engineer Member DDA
13.L&D.O.:Sunil Kumar Jam, Building Officer
14. NDMC:Rajeev Gupta. ArchitectP. Dinesh, Sr. Town Planner
15.SDMC:R.S. Nagar, Architect I Town Planner
16, DTTDC:Vivek Band. Sr. Executive (SP)Pradeep Sachdeva, ConsultantA.K. Singh, Executive EngineerS.B. Gupta, Executive Engineer
17.DMRC:P.S. Chauhan Chief Engineer (G)Sanjeev Malik, Dy. Chief Architect (Land)H.P. Mukhi, Manager (Land)P.S. Bisht, PM/LA
18.CPWD:Ashubsh Kumar Singh, Asstt Archect
19. Delhi Police:Satyavir Singh. Assti Commissioner of Traffic El'
Minutes of 411, Technical Committee meeting of 2013
DELHI DEVELOPMENT AUTHORITYMASTER PLAN S ECTION , 6TH FLOOR,
VIKAS MINAR, NEW DELHI - 110002
Dated 18.04.2013Df-F. 1(4)/2013/MP I 13
Sub: Minutes of the 4th Technical Committee Meeting held on 18.04.2013
The minutes of the meeting held on 08.04.2013 have been put up for approval andthe same will be circulated to all the members shortly. The Chairman T.C. opined
that in future the draft minutes should be put up for approval immediately so that themembers of Technical Committee get sufficient times to submit their observations.
Item No.151201
Modification in the layout plan of land measuring 32.75 Ha at Village
MahipalpUr
F3(4)2005/MP
The proposal was presented by the Director (Pig.) Zone ('F' & H). After detailed
deliberation, Technical Committee recommended the proposal as contained in Para
3 of Agenda for further processing for Change of Land Use under section hA of
DO Act 1957 by Authority and MoUD.Action: Director (Pig) F&H, DDA
Item No.16/2013
Change of Land Use of land measuring 3522 sqm (0.35 Ha) from 'Recreationaluse Zone (Protected Forests) to 'Transportation' at Sport Complex, HauzKhas, R.K. Puram for construction of Janakpuri (West) - Botanical Garden -
Kalindi Kunj corridor of Delhi MRTS Project, Phase- Ill (Line-8).
F21(02)2013/MP
The proposal was explained by the Director (Pig) Zone ('F' & 'H'). The TechnicalCommittee recommended the proposal of Change of Land Use for the area measuring
3522 sqm (0.35 Ha) from 'Recreational use Zone (Protected Forests) toTransportation at Sport Complex, Hauz Khas, R.K. Puram for construction ofJanakpuri (West) - Botanical Garden - Kalindi Kunj corridor of Delhi MRTS Project,
Phase- ill (Line-8)" for further processing under section hA of DD Act 957 by
Authority and MoUD.
Action: Director (Pig) F&H, DDA
Minutes of 411, Technical Committee meeting of 2013
Item No.17/2013
Change of Land Use of land measuring 3753.Osqm on permanent basis forconstruction of lIT Metro Station on Janakpuri (West) Kalindi Kunj corridor of
Delhi MRTS Project, Phase-Ill.
F21(13)2011/MP
The proposal was presented by the Director (AP-1) Zone 'F' & 'H'. The Technical
Committee approved the proposal for Change of Land Use of land measuring3753.Osqm on a permanent basis for construction of lIT Metro Station on Janakpuri
(West) Kalindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processing
under section 1 1A of DD Act 1957 by Authority and MoUD.
Action: Director (AP-I) F&H, DDA
Item No.18I21
Proposal of DTTDC Govt. of NCT of Delhi for construction of Delhi Haat forEast Delhi by covering Shandara Link Drain of Irrigation & Flood Department
along Noida Link Road at Mayur Vihar Ph-I
F20(1 )93/MP
The proposal was explained by Director (Pig) Zone 'E' & '0'. A Power Point
Presentation was also made by Consultant, DTTDC. After detailed deliberation, theTechnical Committee recommended the proposal of "DTTDC, Govt. of NOT of
Delhi, for construction of Delhi Haat for East Delhi by covering Shandara Link Drainof Irrigation & Flood Department along Noida link road at Mayur Vihar Ph-I" ascontained in Para 3 of Agenda for Change of Land Use and for further processing
under section 1 1A of OD Act 1957, by Authority and MoUD.Action: Director (pig) E&O, DDA
(I.P.I ^,
PARATE)Director (MPR&T C)
Meeting ended with vote of thanks to the Chair.
Copy to:
1 Vice Chairman, DDA2. Engineer Member, DDA3. Finance Member, DDA4 Pr. Commissioner (LD)5. Commissioner (Pig)6. Commissioner (LD)7 Commissioner (LM)8 Commissioner (EDMC)9. Chief Planner, TCPO10. Chief Architect, HUPW ODA11. Chief Architect, NDMC12. Chief Engineer (Property Development). DMRC13, Chief Engineer (Elect.), DDA14. Chief Town Planner, SDMC15, Chief Eng. Director Project-I, DJB16. Chief Architect, DMRC17. Addl. Commr.(PIg.) (Infrastructure & UC)18. Addl. Commr.(Plg.)TB&C, DDA19. Addl. Commr (Plg.)UE&P, DDA20, Addl. Commr.(Plg.) AP & MPPR.21, Addl. Commr. (Landscape) DDA22. Director (AP-1) F&H, DDA23 Director (AP) E&O, DDA
Minutes of 411, Technical Committee meeting ul 2013
Annexure -A
•Ist of participants of 4th meetin g for the year 2013 of Technical Committee on
18.04.2013DELHI DEVELOPMENT AUTHORITYSJSh.JMs.
1 Abhay Shina, Engineer Member ODA
2. J.B.Kshirsagar Commissioner (Pig), ODA
3. Savita Bhandari, Addl. Commr (Landscape)DDA
4. P.M. Parate, Addl. Commissioner (TC&B). DDA5, Dr. S.P. Bansal, Addl. Commissioner ( , Pig)-I, DDA
6. Ashok Ghodeshwar. ACA-11, (HUPW). DDA
7. Sandeep Mehta, Chief Engineer (Elect), DDA
8. I.P. Parate, Director (Plg.)MPR& TC, DDA
9. Tapan Mondal, Director (Pig) AP (E&O)10. P.K. Bhera, Director (Pig) Zone F&H. DDA11. M.K. Verma, Dy. Director (AP) E&O12, Vijay Kumar, Engineer Member DDA
13. L&D.O.:Sunil Kumar Jam, Building Officer
14.NDMC:Rajeev Gupta. ArchitectP. Dinesh, Sr. Town Planner
15.SDMC:R.S. Nagar, Architect / Town Planner
16.DTTDC:Vvek Band, Sr. Executive (SP)Pradeep Sachdeva, ConsultantA.K. Singh, Executive EngineerS.B. Gupta. Executive Engineer
17.DMRC:P.S. Chauhan Chief Engineer (G)Sanjeev Malik, Dy. Chief Architect (Land)H P. Mukhi, Manager (Land)P.S. Bisht, PM/LA
18.CPWD:Ashuosh Kumar Sin g h, Assh Arcnic;
19. Delhi Police:Satyavir Singh. Asstt. Commissicne Traffic E)
Minutes ol4 th Technical Committee meeting of 2013
EJ
chi
AdItem No: 18/2013/TC
AGENDA FOR TECHNICAL COMMITTEE
Sub: Proposal Of D1TDC Of GNCTD For Construction Of A Dliii Haat For East Delhi By Covering
Shandara Link Drain Of Irrigation & Flood Control Department Along NOIDA-Link-Road At Mayur
Vihar Phase- IHe No: F20 (0i)93/MP
BACKGROUND:
1.1 Managing Director DTIDC Ltd. vide his letter dated 3.8,12 to Vice Chairman DDA hasrequested for Development of Dull Haat, Mayur Vihar, Ph-I, Delhi. He has also informed thaiHon'ble MP Sh. Sandeep Dixit during his visit on 19.5.12 has desired that the tecsftility of
construction of Dilli Hoot for East Delhi by covering the open drain flowing along NOIDA-Link-Road. opposite Mayur Vihar Phase- I may be explored. Chief Engineer, DflDC Ltd. Videletters dated 23.10.2012 & 12.03.2013 forwarded a minutes of Meeting of Chief Secretory.GNCT of Delhi held on 13.09.2012 and has requested for conveying the feasibility for
Change of Land Use for the covered portion of the Nallah /drain for the proposed
construction of a Dilli Hoot over the drain. A conceptual proposal/ plan of the site underreference have been enclosed along with. A copy of convey letter to DTTDC EngineeringDiv. from GNCTD Engineering Div. dated 12.03.20 13 regarding Transfer of Irrigation & FloodControl Depft. Land on Long term Lease basis to D11DC for construction of Dull Hoot at
Mayur Vihar, Delhi was also enclosed. (ANNEXURE- I)
1.2 A copy of representation to CM, Delhi train the President of Vigyan Lok CGHS, Mayur Vihar,Ph-I has also been received through CE(EZ) DDA in which the CGHS stated that theconstruction of such project will provide spaces for community/ conference hail, plaza,library and parking etc. besides minimizing/ solving the causes of health hazard and protect
the environment. Also stated that some other societies! RWAs have made similar
representations to CM, Delhi.
2.0 EXAMINATION:
2.1 As per the conceptual proposal / location plan forwarded by Managing Director DIIDC,
the site u/r forms part of and along Shandcrro Drain, Mayur Vihar Phase - I near Metrostation. The DTTDC, GNCTD submitted the proposal for developing a Dilli Hoot for eastDelhi by covering Shandara Link Drain of I & FC (Irrigation & Flood Control) Department
(situated between RD 2915 m to RD 231 5m) measuring 27000 sqrn (600 X 45 m) approx. The
I & FC Department has leased out the portion under reference to DTTDC on long termbasis (for 99 years). Responsibility of maintenance and de- silting of drain on the coveredportion including operation of outfall structures will be of DTTDC. This has already beenagreed upon in a meeting of Chief Secretary of Delhi in a meeting held on 13.9.2012. It isalso stated in the letter off & FC Department that the allottee i.e. DTTDC will use the landonly for the purpose for which it is allotted & not for any other purpose.
2.2 DUDC submitted only a Preliminary Project Report, May, 2012 of the proposed Oil/i Hootcovering Shobdora drain situated along NOIDA Link Road, opp. Mayur Vihar, Ph- I. The siteis parallel to Metro Line aligned along the drain & at a distance of about 500m fromAkshardham temple. Easy accessibility from the Mayur Vihar Ph-1 Metro Station would beavailable. Proposed activities as per Zoning Plan f sPe as per the enclosed submitted PrelimProject Report of DTTDC are:-
a( Craft Shop
f) Food Courth) Amphitheatre qi Vehicular eni:y/ parkingc) Security and office
ii ervicu Entry
d) General Amenitiese) Ticket Counters
Conceptual proposal of alignment plan and cross-section over the covered drain andproposed use activities like craft shops. food !aa. general amenities, and amphitheate
is
El
/
,n',ir at paoe '.7 and 8 c iC:. rnnativcN/ :T-.Y'd iu'
1....' •.' H iJj;.,j
J uring flon-monsoor, period water flows through only the small ceniui p; ui Jror.ereas. on borh the side-banks grew vegetation/plants The Hoot design proposesrestore the existing green along both sides/banks of the drain so that
efl V i1aflnenjaf impact .s minimized,
H 66 KVA line is running parallel to the drain. As such the issue of relocation;hHiing/or laying underground cable is stated being taken up by DUDC with
ened electncifv suoply department.
09sERVATIONS-
2.3 mc land use of the requested site under elerence is UTILITY as per ZDP of zone-E'MD- 202 I.
2.3.1a cody arid measuring 1.2 Ha has been allotted to DTTDC at Geeta Colony for Dilli Hoot.
aea Colony which remains unutilized since 2005.
2.4 Frovtsicns of MPD 2021 regarding Drainage system are:
F lood Protection ana storm waler discha wnich are inter-relatedEhIjar-H reatmenf ';houtd be provided at cc;iain using advanced lechnique.Drainage should be linked with the ecology and green networks by adopting theconcepts of Bio-drainage' and other measures.H a Shandara Drain is part of moh drcrroc system of Delhi having moior twoaspects: flood protection and srorm water di scharge which are interre:atod. MPD921 suggested prohibifion of blockage of natural depressions and draInage
- i annels.
2.5 r. ],^c JSio iE issued regarding covering of dram are:
2,5.1 OSD to LG vide dated 9.2.10 w.r.i. meeting of REG (Env.) held at Fai H:• H5.;9 in conrext o City drains to he covered for creating pardng space' has H
ran;• in he covering of drains will not be pe rmitted in I L'tu:e".
2.5.2 In the 21i' LHIPEC governing body meeting held on 19.2.10 at 10-30 am., underrmanshlp of Honhle L.G. of Delhi, in context ot a proposal some drains to be covered
creating parking space, it was decided that "No such covering of drain, hencefor-p , willhe token up by any agency, apart from ne works WhiCh have already been unic4crnk;-1cnn hee nha,n;. cii;J ha aIa.ar-;" ...... a ....... H
Jar, ,; wirerCaS as per Clause 5.10.2. ORGANISED INFORMAL SECTOR (Hoafl of MEL 21nh •actvity like 'he proposed Dilti Hoot
in tH 'UTILIT Y - Zone.
27 in' '.' ew of MED •02' P rovisions and he 2 : 9999: .................Ha i',:erns is Environmental Im pact Assessment sm-
2 8 .: cc only a preliminary project reoor wan•;3porl woulc requre A Project Report ia: moved by ON LTD ric;caHrn rne prole.. cc H
required for CL).
2.9 -. Hr:L.::5 .at an-Her :eferen:e require Li'avdrig Cleaian —Luring n on-monsoon period wafer flows only through the small central part cl Join
on both the side-banks grew vegerat joniplanfs DTIDC/ Irrigation and -loadaantrol Deoartrnenf shall have to obtain necessary Environmental Clearances a thregard
Regard ng storm wafer flow during mon500- and its ldrin) c:(eOninc andmaintenance from concerned Enainu............
-
Ii
.5a -
-I,
NOC for covering of drcnnwi i h u: ccl H decision of the 21 Ufl!IFC C,-. fticBody meeting held on 19.02.2010 under chairmanship of Honble LG directing not tocover drain, henceforth.
iv. NOC with regard to existing 66 KVA overhead tines running along the proposed site.V. Clearances from UTTIPEC with respect to comprehensive traffic circulation system,
entry/ exit, to the project area, parking etc. with respect to abutting Delhi- Noida-LinkRoad and other roads under influence, if any,
3.0
PROPOSAL:
3.1 The proposal is for Change ol LandI) (OLd, Ha-n UTILITY (U5 DRAIN) to COMMERCIAL(5.10.2 ORGANISED INFORMAL SECTOR PLACES (Haat)) in respect of the Land fsitijaledbetween RD 2915 m to RD 2315m) moasuring 27000 sqrn (600 X 45 m) approx. fordeveloping a Dliii Haai for east Delhi by covering Shandara Link Drain of I & FC (Irrigation &Flood Control) Department.
The area is bounded by -
NORTH : Shandora Link Drain stretchSOUTH Shandara Link Drain dretchEAST : Mayur Vihar Phase-I. MRTS Line, CG Housing SocietiesWEST : Delhi-Noida-link Road (MP Road 60 m R/W)
3.2 Development controls as per Table 5.4 of MPD-202 I as under shall be applicable:
Use/ ngs
ises if m of F!. areaJOrganisedInformal Bazar
3.3 A low intensity development is to be proposed.
3.4 The proposal would be subject to following clearances:I. E1A Clearance from Department of Environment
2.. Clearance from Hood & Irrigation Dept.:3. NOC for covering of drain with respect to the decision of the 21st UUIPEC Gcverning
Body meeting held on 19.02.2010 under chairmanship of Honble LG.. Clearances from UTTIPEC with respect to comprehensive traffic circulation system, entry/
exit, to the project area, parking etc. with respect lo abutting Delhi-Noida-Link Road andcf-ier roads under influence.HOC with regard to existing 66 KVA overhead lines running along the proposed site.C Tree cutting permission.
.7. NOC from DMRC and surrounding CGHS.
Ide above proposal of Change of Landuse in MPD-2021 and ZDP of Zone -E' under Section I 1 A ofLID Act is to be submitted to the Authority for consideration.
4.0 RECOMMENDATION.
In view of the above facts (Para I & 2) the proposal mentioned at Para 3. isPlaced before the T.C. for appropriate decision, subject to compliance of the requiredclearances OS mentioned in Para 3.4.
7-,
Dir.Py. one 01 '-1
Asstt. Dir, (AR) Zone- H'
ite prop w epIained by Director (Pig) Zone E & 0 A Power Poiniesentak ,on wo thd made by Consultant DTTDC After detailed deliberation the
the proposal of DTTDC Govt of NCT ofDelhi, for do- istrution oelhj Haat for East Delhi by covering Shandara Link Drainof irrigation ood Department along Noida link road at Mayur Vihar Ph-I" as
contained in Para 3 of Agenda for Change of Land Use and for further processing
under seclon 1 1A of DD Act 1957, by Authority and MoUD.
Action: Director (Pig) E&O, DDA
(0 o:) -,,j
-O 0)DCD 4'
CD
QCn
(D (D
CD
Ui M
C)
0. D --C—
C) CD
co
CD1
(C
Ni0
.01
0
C)0
0
0S.C0
00IV0.
q
==
F
CD
2
. / 1I .'; tftft '1!Hff
L.
hhil l If1fl1TflIL
I Ci.)
I J.)C)I II . I ml
; L
H(1
I / IH'rI
JJI 'Lco
CONCEPT
II)CuJ
--
- HC
-
./- - -
w --- 'i-- -\
',.,
-- --:--- - --
- -- 5, -
Lu
Lu
aN
a
U
-
Fj
4d1PItZ Y
I -LU
c . 'i•':'
Ii \- •S\ /
çr
.S. /
I i . -.. \5'-
5,'
5. F
\.
N
t&- Item No: 18/'20 11
AGENDA FOR TECHNICAL COMMITTEE
Sub: Proposal Of DTTDC Of GNCTD For Construction Of A Dilli Float For East Delhi By Covering
Shohdara Link Drain Of Irrigation & Flood Control Department Along NOIDA-Link-Road At Mayur
Vihar Phase- IFile No: F20 (01 (93/MR
BACKGROUND:
1.1 Managing Director DIIDC Ltd. vide his eHer dLcoa 3.8.12 to Vice Chcnrrnan DDA hasrequested For Development of Dilli Haat, Mayur Vihar, Ph-I, Delhi. He has also informed tharHon'ble MR Sh. Sandeep Dixit during his visit on 19.5.12 has desired that the feasibility of
construction of Dilli Hoot for East Delhi by covering the open drain flowing along NOIDA-Link-Road. opposite Mayur Vihar Phase- may be explored. Chief Engineer, DTTDC Ltd. Videletters dated 23.10.2012 & 12.03.2013 forwarded a minutes of Meeting of Chief Secretary.GNCT of Delhi held on 13.09.2012 and has requested for conveying the feasibility for
Change of Land Use for the covered portion of the Nallah /drain for the proposedconstruction of a Dilli Hoot over the drain. A conceptual proposal/ plan of the site underreference have been enclosed along with. A copy of convey letter to DTTDC EngineeringDiv. from GNCTD Engineering Div. dated 12.03.2013 regarding Transfer of Irrigation & FloodControl Deptt. Land on Long term Lease basis to DTTDC for construction of Dilir Haat at
Mayur Vihar. Delhi was also enclosed. (ANNEXURE- I)
1.2 A copy of representation to CM. Delhi rrcrn The President of Vigyan Lok CGHS, Mayur Vihar,Ph-I has also been received through CE(EZ) DDA in which the CGHS staled that theconstruction of such project will provide spaces for community/ conference hail, plaza,library and parking etc. besides minimizing/ solving the causes of health hazard and protectthe environment. Also stated that some other societies! RWAs have made similar
representations to CM. Delhi.
2.0 EXAMINATION:
2.1 As per the conceptual proposal! location plan forwarded by Managing Director DTTDC,
the site u/r forms part of and along Shandara Drain, Mayur Vihar Phase - I near Metro
Slation. The DTTDC, GNCTD submitted he proposal for developing a Dilti Hoat for eastDelhi by covering Shandara Link Drciin of I & FC (Irrigation & Flood Control) Deportment(situated between RD 2915 m to RD 2315m) measuring 27000 sqm (600 X 45 m) approx. TheI & PC Department has leased out the portion under reference to DTTDC on long termbasis (for 99 years). Responsibility of maintenance and de- silting of drain on the coveredportion including operation of outfall structures will be of DUDC. This has already beenagreed upon in a meeting of Chief Secretary of Delhi in a meeting held on 13.9.2012. It isalso stated in the letter of I & FC Department that the allottee i.e. DTTDC will use the land
only for the purpose for which it is allotted & not for any other purpose.
2.2 DTTDC submitted only a Preliminary Project Report, May, 2012 of The proposed Dif ii Hoot
covering Shohdaro drain situated along NOIDA Link Road. opp. Mayur Vihar, Ph- I. The siteis parallel to Metro Line aligned along the drain & at a distance of about 500m fromAkshardham temple. Easy accessibility from the Mayur Vihar Ph-I Metro Station would beavailable. Proposed activities as per Zoning Plan of site as per the enclosed submif led Prelim
rcject Report of DTTDC are:-
a) Craft Shop
1) Food Court:) Amphitheatre g) Vehicular entry/ parkingc) Security and office
h) Servicr. Entry(1) General Amenitiese) Ticket Counters
Conceptual proposal of alignment pion and cross-section over the covered drain andproposed use activities like craft shops, food plaza ,. qerreral amenities, and amohithealr
r
I-ci /::cr cc7 0ra Hi ;c':Cj\/iv C 5Ed nic'
unrc non-monsoon period wafer flows through only the mci central part•.herects, on both the side-banks grew vecietahon/planjs The Hoot dosictn'- . '.00sccc re;tore the existirg green alon g borh sides/ g ank s of the drain so
environ onol mpocT is minimized
6 Kvc ne h rjnr y nci paralL ne crcrin, As mar 'rc 'cent mc,,'hi f tinq/or laying Lrider round coole 1 ced heir c 'arer a r, 1
:snrnect CCCt(iCity ;uopiy dep.cn I me: ii.
OBSERVATIONS:
The cr2.3
2.4
.lreoa -. :'i' .1 be aD/tm: H a:'.:n:: Hv lot DIlGee/a Coicry which remciris unufilized since 2005.
Projsic.ns c MPD 2021 regrdinçr Drainage systeri:
Flood p rolcfion and stom 'water 1kcharces which are inter-related• EffILJCID treatment ho cIa be provb ed al c'•utfalls using advanced technicu
Drainage should be 'inked with the ecology and green networks by adopting theconcepts of "Bio-drainage" and other measures,
ie Shandom Drcin is port of main drainage system o Delhi having major I.'.c . pecs: flood protection and storn-i water discharge which are interrelatco'. M:2! suggested prohibition of blocka ge of natura depressions and C:a annels,
- r issued regardinc covering of dm's arm
2.5.1 OSD to LG vide daed 9.2.10 w.r.t. mee t ing of RPG (En, , .) held 07 Raj Nivvj 0027.b.09 in context of 'City drains to be covered for creating parUng soace has drctedthat the covering of drains will not be perm tied in futuie".
2.5.2 In the 21 st UTTIPEC governing body meeling acId on19.2 'n lQn0a I abe:bhairmansh,p of Hon'ble L.C . . of Delhi, in context of a oroposal some drains to be COVerP(:or creatiri parKing space, i was decided That "No such coverin of drain, henceari.b, v,':oe faker up by any agency apart from the works which have -already been uncnrtckercn.'J em drons hi/d be cleared cr:d daveoped vl!t'eco/ocuca/ ar.djr 'C
2.6 1. I :r ,:e of the site under reference air per h"PD 2021 and ZDP of Zone E' is "Utility"Drain whCrs as per Clause 5.10.2. ORGANISED I NFORMAL SECTOR (haaf) of MED 2021a . I. •:e the p r oposed Dull Haat is a Commer*l activit y which is not a permsib!eUTILITY'- Use Zone,
2.7In view of MED 2021 pro\'isicns and the 21' UTTIPEC Governing Body decision, one of majorconcerns is Environmental impact Assessment issue.
2.8 nce only a preliminary proiec report with concep tual pr000sai has been subn-iitUi thep"oposal would requke A Project Report approved by GNCTD indicating the project land
re - ne "V 'h d imnens 'anr and other otails required for CLU,
2.9H 'Ic cccl under ref erace require foliowing clearances -ring non-monsoon aehod water fows only through the small central pad of drain.ereas. on both the s ide-banks grew vegetation !plonifs DTFDC/ Irrigation and Flood- ntrol Department shall have to obtain necessary Environmental Clearances in this
n2ard
ePaicling storm water fow during maflmr" and its drain) C 1 enrin.,: andi'H'rrrrc trcrc c.c'"'cec-.r•'cl E" ir'cmin i = C l . ....
Use! UseMax, CoveraIPremises (%)
Organised 40HIitfpTma]Bazar
Height
Parking std.(mts)
ECS/l0O sqm of Fl. area40
8
-
NOC for covering of drain with resnect decision of the 21 UTTIPEC CBody meeting held on 19,02.2010 under chairmanship of Hon'ble LG d ecHo octcover drain, henceforth.
iv. NOC with regard to existing 66 KVA overhead lines running clang the propos'i.
Clearances from UTTIPEC with respect to comprehensive traffic circulation syHan'entry/ exit, to the project area, parking etc. with respect to abutting Delhi-N,:du-1,jrTRood and clher roads under infue,'ace, if cn.
3.0
PROPOSAL:
3.1 The pro posal is for Change of l.anduoc ' CL I 'ccc UTILITY (U5 DRAIN) to COMMERCIAL(5.10.2 ORGANISED INFORMAL SECTOR PLACES (Hoot)) in respect of the Land (sifucHbetween RD 2915 IT, fo RD 2315m) measuring 27000 sqm (600 X 45 m) appr'x, lideveloping a Dilli Haaf for eaH Delhi cv :O'v'c'rir ':i dara Link Drain of I & FC (i" 'ia''load Control) Department.
The area is bounded by
NORTH : Shandcra Lii Drain slatcSOUTH Shandara Link Drain stretcnEAST : Mayur Vihar Phase-I, PAR TS Line, CO Housing SociejesWEST : Delhi-Noida-li Road (MP Road 60 m R/W)
3.2Development controls as per Table 5.4 of MPD-202 I as under shall be applicable:
.'
-
3.3 A low i ntensity development is to be proposed
3.4 The proposal would be subject to following clearances:I, EIA Clearance from Department of Environment
7. Clearance from Flood & Irrigation Dept,2.
NOC for covering of drain with respect to the decision of the 21st UTTIPEC GoverningBody meeting held on 19-02.2010 under cha irmanship of Hon'ble LG..1 Clearances from LITTIPEC with respect to comprehensive traffic circulation system, entry!exit, to the project area, parking etc, with respect to abutting Delhi-NoidaLflk R: .::.] andother roads under influenceNOC with regard to existing 66 KVA o verhead lines running along the proposed Cô. Tree cutting permission,
7. NOC from DMRC and surrounding cc-'
The above proposal of Change of Landuse in MnI:2L, arC LOP at Lana 'E' under Setici-, H A CDD Act is to be submitted to the A uthority for corc,.ier:
4.0 RECOMMENDATION:
In view of the above facts (Para & 2) he oraposr-L mentioned at Pia 3. 'sPlaced before the T.C. for appropriate decision subiect to compliance of the
re gijiredcleara,ces as mentioned in Para 3.4.
1 ' /Dy.ir. (PI Zon -' p 0' Asstt Dir. (AP) Zon e -' ,:
The proposal was explained by Director (Pig) Zone 'E' & '0. A Power PointPresentation was also made by Consultant, DTTDC. After detailed deliberation, the
recommended the proposal of "DTTDC, Govt. of NOT ofDeJh 66ñ9trjotion of Delhi Haat for East Delhi by Covering Shandara Link Drainof'trria (àocT.Department along Noida link road at Mayur Vihar Ph-I" asdtç d "a"3'bf Agenda for Change of Land Use and for further processing
' ühdrectjoñ A'fith Act 1957, by Authority and MoUD.
Action Director (Pig) E&0, DDA
0
-c0
C
CL
ci
(0 o:) -,J
C) (D -J C) SD
co
- C r 0rCI-.-
Q(D
I
sr.
2
/i/ -
C')
a.
C)
CTI 4Nj j3J IC) • ( Hftfl
(a iiffl1
CL
(D
HJLr.) L
ml
Li Hr.
rn
I
I1 (l_
/rrrfrn1
WILW
CO4CEPT
1
I --
L
/• •/ - • /7• ::; .v' c
N / .• '- ----
I
--•_'•) II•__\. • •
I
4111
- w • -
• - •\ // - N
-. •1
-.
\ •-\',-
I;\\_
'--- •I- •-./
iI'\ •- 1
•v, ' - U
;
- - ,•• --
•
- •-
W\.
OL
- \
:----.---
4i- --- I
w
U
i.N
-
-J
(1
L:J
0N
4,1,dk - t TLC c4f
Date
AGENDA FO R TECHNICAL COMMITTEE
Fr
F.21 (13) 2011/MP
Subject: Change of land use of land measuring 3753.0 sq. m on permanentbasis for construction of UT Metro station on Janak Purl (West)-Kalindi Kunj Corridor of Delhi MRTS Project, Phase - Ill.
1.0 BACKGROUND:
Chief Engineer (Gen.) DMRC vide letter dated 28.6.2011 has requested forallotment of land measuring 4851.00 sq. m on permanent basis for AncillaryBldg. & Entry/Exit Shaft Required for construction of Janak Pun (West)- KalindiKunj Corridor of Delhi MRTS Project, Phase - Ill.
II. Subsequently vide letter dated 11.4.2012, Chief Engineer (Gen.) DMRC hassubmitted an modified proposal for requirement of area 3753.0 sq. m forAncillary Bldg. & Entry Exit.
2.0 EXAMINATION:
The site under reference proposed by DMRC, for Ancillary Bldg. & Entry /Exit arelocated in the Houz Khas District Park . Location plan showing the site is placed asAnnexure-A. The proposed 3 pockets 11T-2, IIT-3 & 11T-4, are part of the DistrictPark (Reserve Forest) and as per the MPD-2021 and Zonal Development Plan ofZone F, these sites are falling in the Recreation use zone i.e. District park (ReserveForest) Annexure-B.
I As per the provision of MPD-2021, Metro Stations along with property development(composite development) up to a maximum area of 3.0 ha shall be permitted in allUse Zones, except in Recreational and Regional Park / Ridge Use Zone, Lutyens'Bungalow Zone and Heritage Zones, subject to approval of Technical Committee ofDDA.
It As per the examination of Landscape Deptt., the site under reference is part of theDeveloped Rose garden. DMRC has desired 1035 sqm of land for Permanent basisfor Entry! Exit Shaft, and other 1631 sqm for Ancillary Bldg&1087 sqm for Entry /Exiton other side. A number of trees are affected in the proposal which includes 68PTrees & 230 Shrubs & Plants.The details of the affected Trees and other featuressubmitted by Dy. Director (Horticulture) are annexed as Annexure - C.
iv. Since the area is developed park, falls in the Recreational Use Zone it will requireChange of Land use from Recreational' (City Park,District Park, Communitypark(Reserved forest) to Transportation' under the provision of Section 11-A of theDDAct, 1957.
3.0 PROPOSAL:
The details of the 3 pockets i.e. IIT-2, IIT-3 & IIT-4 required for permanentAncillary Building, Entry! Exit & shaft is given below and shown in the planplaced as Annexure- D
SLNO
Li.2.3.
Location of Land
111-2IIT-3IIT-4
Total
Presentreq u i reme fl1631.00 sq1035.00 sq1087.00 sq3753.00 sq
Basis
m Permanentm Permanentm Permanent
Purpose
Ancillary Bldg.Entry/Exit& ShaftiEntry/Exit &Shafti
I
The Change of Land use of an area measuring 3753.0 sq. m in 3 Pocketsie. 11T-2, IIT-3 & 11T-4 as shown in the plan required for Ancillary Bldg,
2.
Entry/Exit & Shaft at Hous Khas District Park has been proposed fromRecreational (City Park, District Park, Community park(Reserved forest)to 'Transportation' with the following boundary description and to beprocessed under the provision of Section 11-A of the DD Act,1957 subjectto the following.
a. DMRC shall obtain clearances from Forest Department and otherconcerned statuary Bodies since the land is falling within the reservedForest area.
b. DMRC shall obtain necessary clearances from statuary authoritiesconcerned for cutting of trees, as per the statuary requirement and plantthe required number of trees as per statuary requirement.
c. No construction shall be allowed till final notification of Change of Landuse is notified by the Ministry of Urban Development, Govt. of India.
d. Ownership status shall be confirmed by land department before handingover the land to DMRC
The details of Boundary are mentioned below.
North: District Park
South: Outer Ring road
East: Safdarjang Development Area
West: District park( Rose Garden)
4.0 RECOMMENDATION:
The proposal of Change of Land use from 'Recreational' ((City Park,District
Park, Community park(Reserved forest ) to 'Transportation' for an area
measuring 3753.0 sq. m in 3 Pockets as explained in para 3 and shown in the
plan placed at Annexure D is placed before the Technical Committee for its
consideration.
Asstt. Dir. (AP-1)
4-44'.> +-,,,
,j Director (AP-1)
The proposal was presented by the Director (AP-1) Zone 'F' & H. The TechnicalCommittee approved the proposal for Change of Land Use of land measuring3753.0sqm on a permanent basis for construction of HT Metro Station on JanakpLJri(West) Kalindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processingunder section 1 1A of DD Act 1957 by Authority and MoUD.
,' LL&
Action Director (AP-1) F&H, DDAtAASTE,^:,
This p, sal. was Con.sider€d in
the......................TechniC Comr'1t
Meeting hel.d on ........ .i2....L).1..........2.
wie Itern NO ..........
A reJr Dy. Director1,
III
^
I I G
""_
_.^jo ^^ ^4
NATIONAL Ht2T11tITOf HEALTH J. rA*LY
= WELF AE-:
AtoOXURE \ Bdirc
I L . ...v.:::.vv,v-.v.-v--.:.1
F18
- t-
iv
....,:::::::::J4AMN4
______--------1 . • V / / - --;- : y-y -
______ I L:==-V Ar1 '-
/ / E> .............................,//
/ / - 1 1/FOREST -::::.-;-::. - - - - - V/
/// / -ô.
TOHAUU IV ///.VV/. -
Ii QUT
__// ,// - • / -, V V / -. V /. V ////. /
/
V7UAGV -.
- - V V
-
•V/
//
lm_I '
V •V -- V V - -. -
V•V:V -. ._,r..
- - -
I I.-:-:
. . . . . . . . . . .
S -
AP4CWWIIII.'C
WI
The joint cnrvey has been 01 1nctd with the stall ol )M i; tle ronowing laturcS ai
sti11C oil the mud v1ncli have In be atlntnttnt onpel naneul basis
1 ICe Plaits
-4iehtot Nos.
2. -itas I 0 T'Ios.
( ulilioliar ( Nos.
Neeni I I Nos,
Papdi. () Nns.
(. Pilkhai I No.
7. 1Ilivel, I No
X. caIvjtc 19 No,;
K fl<nr (, Nos.
Intal (X No.s
P hitits
L (limidili '1). Nos.
2. .avistnhlifl 'altfl Nos.
. Rose Icd 4 No. (I Nos'1ai)
I nial , 230 Niis.
t1ier lcatnrcc ecisting.
I. Flectric light pole 0 3 Noc.
S
2. l7lcctric leader pillar UI No.
Pinup boise UI No.
I F,xistiiig red haj ri Path 7X3 219 Sqai
. tlndergrnund (l pipe line 10.50 Rmti
(. 1oin1(11w :III willi (il II. 15! Roil.
(..(f ).
,\ 7
\!) t,il4 - ; So (II)
/
I)H 1,
;•.
'S
- -.. ,. ,S•
t• S S S
-r
1 -f-+ -f- 4- -T
+ T + I + + --
- + -F-+ -
-F-• - --- -- -c -
OZ
-' z
Zfl --
:
moz 0
.. -1
woo
0 F--z
•00
tfl>0
0 -o
- mF'4Z0-4 •
1!
+ ±
H1±1i+ -F- + + + - +
+
+ F- +
++ -
+ ++ ++ ±_ -i
F- ±
+)1- + +
+ \.',-t 4-
Ill
4
4
/
73- t + F-
-î + + +
-.-f- -r
; > - I
ml- -
- +/ + +
+ .,
F-
- 4-4- -I
++ + +
- --
tOJIASARPJ
ThI /
^^ ^ C-^-,
'.3
' Tn- 4Ci1O 1F>Z.> C) rn
ZO0ZUm C) -4
0 ID F- -.
1 0 OZ =I x-
>c
L
0 C/) C/)
1I rn>
.-Jt
L_1
-J
k.0
I
o
II,
I,
4 &(a
kk- Item No.
Date____________________
AGENDA FOR TECHNICAL COMMITTEE
No.: F.21 (02) 2013/MP
Subject: Change of land use of land measuring 3522 sqm from Recreational Use Zone
(Protected Forests) to Transportation at Sports Complex, Hauz Ktlas, K.K.
Puram for construction of Janak Pun (West)- Botanical Garden-Kalindi Kunj
Corridor of Delhi MRTS Project, Phase - Ill (Line-8).
1.0 BACKGROUND:
Chief Engineer (Gen.) DMRC vide letter dated 28.6.2011 has requested for allotment ofland measuring 6706.00 sq. m on permanent basis for Ancillary Bldg./Parking/Shaft,Entry/Exit Shaft Required for construction of Janak Pun (West)- Kalindi Kunj Corridor ofDelhi MRTS Project, Phase - Ill in file no.F34(24)2011/IL.
II. Further, VC, DDA vide note dated 2.3.12 in file bearing F34(24)2011/IL at page 6/Nagreed to handover the land of Pocket RKP-V (1056 sqm) and RKP-VI (565 sqm) to DMRCand DMRC will have to go through Forest Department.
Ill. Subsequently, Chief Engineer(Gen.) DMRC has submitted the revised / modifiedproposal to DDA, vide letter no. DMRC/Land/15/DDA/JP/YV/1441/978 dated 13.12.2012(file no.F,34(34)2011/IL) for an area measuring 3522 sqm. in three pockets land onpermanent basis for Ancillary Bldg/Parking/Shaft, Entry/Exit Shaft.
2.0 EXAMINATION:
The proposal has been examined and following observation are made:
The DMRC requested for an area of 3522 sqm. distributed in three pockets i.e. RKP-1(820 Sqm.) for Entry & Exit, RKP-4 (1885 Sqm) for Ancillary Bldg./Shaft/Entry Exit & RKP-5 (817 Sqm.) for Entry Exit/Shaft and Parking. Location plan showing the site are placedas Annexure A.
II. As per observation of the landscape department, the proposed site are part of fullydeveloped District Park and also notified protected forest of Delhi Govt., whichrequires NOC from the Forest Department.
Ill.
As per the Zonal Development Plan of Zone 'F', the land use is "Recreational", DistrictPark / Community Park / City Park/Reserve forest.
IV. As per provision of MPD-2021, Metro Stations along with property development(composite development) upto a maximum area of 3.0 ha. shall be permitted in all UseZones, except in Recreational and Regional Park / Ridge Use Zone, Lutyeins' BungalowZone and Heritage Zones, subject to approval of Technical Committee of DDA.
V. A joint inspection was conducted on 20.11.12 and 2.L13 by Dir. Hort. (South East) withthe official of DMRC. As reported by Hort. Department on 2.1.13, 526 trees are affectedin the proposal. Annexed as Annexure —B.
VI. Since the area is falling in Recreational Use Zone District Park / Community Park / CityPark. (Protected Forest), the proposal will require change of land use to be processedunder Section 11-A of DD Act, 1957, from Recreational to Transportation.
C04-9.
Cf
3.0
PROPOSAL:
SLNO
3.
2.
The details of the Pockets for Change of Land use from 'Recreational' (DistrictPark ) to 'Transportation' in 3 pockets i.e. RKP-1, RKP-4 & RKP-5 is as under andshown in the plan placed as Annexure 'C':
Location of Land Present Basis Purposerequirement
RKP-1 820.00 sqm Permanent Station Box, Entry!Exit
RKP-4 1885.00 sqm I
Permanent Ancillary I Shaft!Entry / Exit
RKP-5 817.00 sqmI Permanent
Ancillary / ShaftParking
Total
3522.00 sqm
The Change of Land use of an area measuring 3522 sq. m at Hauz Khas SportsComplex is required from 'Recreational' (District Park / Community Park / CityPark, Protected Forest) to 'Transportation' and to be processed under Sectionil-A of the DD Act, 1957 subject to the following:a. DMRC shall obtain clearances from Forest Department and other concerned
statuary Bodies since the land is falling within the reserved Forest area.
b. DMRC shall obtain necessary clearances from statuary authorities concernedfor cutting of trees, if required, and plant the required no. of trees, as per thestatuary requirement
c. No construction shall be allowed till final notification of Change of Land use isnotified by the Ministry of Urban Development, Govt. of India.
d. Ownership status shall be confirmed by land department before handingover the land to DMRC.
lit. The boundary details are given below:
North : Sports Field Complex / Woodland, Hauz KhasSouth: Outer Ring RoadEast: Woodland Hauz KhasWest: Africa Avenue
Copy of the plan showing the proposal as marked by Landscape Department isplaced as Annexure - C.
4.0 RECOMMENDATION:
Keeping in view the facts at Para 1 & 2, the proposal as explained at Para 3 is placed for
the consideration of Technical Committee
:-
-Asstt. Dir. (AP-1) Director (AP I)
The proposal was explained by the Director (Pig) Zone ('F' & 'H'). Th,Technjcal
Committee recommended the proposal of Change of Land Use for the area measuring'3522 sqm (0.35 Ha) from 'Recreational use Zone (Protected Forests) to'Transportation' at Sport Complex, Hauz Khas, R.K. Puram for construction of
Janakpuri (West) - Botanical Garden - Kalindi Kuni condor of Delhi MR,TS ProjectPhase- Ill (Line-8) for further processing under section hA of DO *t ,1957 byAuthority and MoUD.
S..-. -
I.
I
I.1I O\
%) l
1
-ii \93
cI4IA.L&V6i.
VI
A-cdAI' i.i.i
I)
i
— i I
/i(1 L
L JJ
I
\VO41api t. 3 (l )
tI
Wo
( 2 t' )1(2 VIJ ( fl ? r(kQi(l III" c,/ -i_/c
i- I..L r )
- ct H(i>
- 1 C
• (r.(ai1 A it
117t0 0 J (S ( •Q
c
si I
. A / I I 1'•1 I. '/ i i P L /
(; O( .v -
Pc4 i--iv'
I r 7. ',fLt' f.
(t ITT /t 4/; /
e(7( /(t("Mr/ (( C
/',:
'1 (c' I (' &iti
L4 'e(t' .q1 ii h 'f ': I x Ile
L T r i ' .c/ .
(Zj) ftc • /1
I
K/
•(2(( (ll( ii (i/A /ii)ii H
(1 )t/ ,'. j )
I! - . (••
M. V170-
( ,7 !Iiir
(.4..
/ 1 J 11
( W(J /)i/ 4
Ttzo '.•i.'(1lr .() ?.
Y
1 • Pt-. I )
C- •) I..l
'f'
J'•??I1 (J.
i(n
c
,vht )
I i::fi1 Hi/ /IL.
ItCJqF
7/ JJ
IN
Ii iII- (-1• S
241J
.
I
I::j7 d(j 03
o
ziI I ,K1. I
I I
1r
!
I I I
//////YTHHH5 -:HHHII I
I- I4.
II /i. 1 I-I -j
TO JIA SARAI t 7 4-I $
cl
.
in min Aol
r
upin- - S
H- 71
• .. ......... ...
(.
I0I I-
ThJQ('L
--Item No. c/ 13 T
Date_________
n t
t^ -
4
AGENDA FOR TECHNICAL COMMITTEE
No.: F3 (4)2005/MP
Subject:
Modification in the layout plan of land measuring 32.75 ha at Village
Mahipalpur.
1.0. BACKGROUND:
The proposal of utilization of 102 l3igha (approx. 8.6 ha) DD / Gram Sabha land along
NH-8 in village Mahipalpur was approved in the Screening Committee meeting held on29.11.2005 vide item no. 121:2005 in which provision for utilization of land for CRPF,
fire station, Commercial use, Recreational and sports were proposed. Location plan
placed as Annexu re-A.
ii. Subsequently, the modified layout plan was considered in the Technical Committeemeeting held on 23.9,2008 vide item no. 144:08 for an area of 29.76 ha incorporatingthe proposal for CRPF, fire station, Commercial use, Recreational and sports with
proposal for change of land use which was approved in principle.
iii. Modification in the layout plan was again placed before the Technical Committee
meeting held on 20.2.2009 vide item no. 12:09 with proposed modification in the
alignment plan of 30m wide road connecting NH-8 with Mehrauli Mahipalpur Road
which the proposal was approved for change of land use under Section 11 A of DD Act,
1957 as approved earlier in the meeting held on 23.9.2008 with the condition that
allotment of plots be made after actual demarcation of road at site.
iv. Considering the proposed under pass to the Airport from NH-8 approved in the
UTTIPEC meeting held on 24.7.2009, and to accommodate the proposed underpass,
readjustment of the land allotted to BPRD, was placed before the Screening Committeevide item no. 149:2009 dated 26.10.2009. The proposal for BPRD land in two pocketson either side of the proposed 30 M road was approved by the Screening Committee.
Plan is placed at Annexure-B.
V. Dy. Gen. Manager (I) vide letter no. NHAI/Tech,/Del- Gur./NH-8/IGIA/2008/1012 dated
22.2.2010 informed that the construction of Northern underpass project has been
dropped, therefore, Defence & DDA land which was handed over to NHAI for the
project be handed over to them. This was also informed by it. Secretary, Mm. of Home
Affairs vide letter no. 23012/79/2009/PC dated 28.1.2010. Accordingly, themodification was proposed to restore the allotted to BPRD i.e. measuring 3.069 ha to
BPRD in one pocket which was placed before the 293 Screening Committee meeting
vide Item No. 87:2010 dt.15.7.2010 it was decided in the meeting that DDA should get
the clarification from the Ministry of Civil Aviation& Ministry of Road transport for
requiring of land in near future. Till such time the proposal is deferred.
vi. In the approved layout plan of Mahipalpur Village, a hospital site with an area
measuring 2.256 ha. was earmarked which is at present encroached by ihuggi dwellers
in the name of Arjun Camp. Therefore, the Hospital site could not be allotted to Health
and Family Welfare department of, NCT of Delhi. The concerned area MLA, Bijwasan
filed a complaint before the Public Grievance Commission that DDA has acquired 100
bighas of land in village and there is no Govt. Hospital for 15 to 20 Kms. in the vicinity
of the area.
vii. In the hearing of the Public Grievances Commission held on 17.4.12, Chairman, PGC
directed Pr. Secretary (H&FW) and Director DHS to arrange the meeting with Sr.
Officers of DDA to resolve the matter. In this context, a meeting was held on 18.5.2012
in the chamber of C! D, DD.A with Drvctor, DHS ., CMC), Planning (DHS), CMO(HQ)DHS
and officers of DDA to discuss the issue relating to allotment of land for 200 bedded
hospital at Mahipalpur.
viii. The Lands Department Suggested the land lying vacant opposite BPRD land which is
part of approved layout plan of Mahipalpur village.
ix. The proposed land for Hospital identified by the Land Department was the site
earmarked for BPRD in the approved layout plan of Mahipalpur. However, the area
BPRD has been adjusted on the opposite side as the under pass project has been
abandoned.
x. The proposal of the hospital on this land which was earlier earmarked for BPRD
requires modification in the plan and also involves change of land use from Govt. to
Public Semi-Public which is to be processed under Section 11-A of DD Act, 1957.
xi. Delhi Jai Board has been allotted 0.63 ha of land for UGR in the scheme area with the
condition that the top surface to be kept as green.
xii. Considering the changes in the area profile and request for additional facilities, it was
decided to work out a comprehensive project adjusting the existing and proposed
facilities.
xiii.The copy of the proposal was submitted to CE (SZ) for feasibility study/ total station
survey on 14.12.12 and 26.12.2012 and also handed over to Land Management
Department for ownership status on 14.12.12.
sJ EXAMINATION:
The detailed land utilization proposal which was approved in the Screening Committee
meeting held on 26.10.09 are as under:
TOTAL SCHEME AREA: 32,75ha (29.75ha + 3 . Oha*). Copy of the plan is placed as
Annexure-B.
SI. No. Description of Land
Area (Ha)
1 Area for BPR&D(earlier CRPF) 3.063Pkt. A-1.36
P kt. B- 1.71
2 Area under SSB 0.297
3 Area of Cremation Ground 0.383
H(Existing) ______________________
4 Area under Fire Station 0.90
S Proposed Area under Recreational & Sports 2.02
6 Area under CSF ______________ 6.21
7 Area under Commercialb) 0.49
8 Area under Green0.20
9 Area under Community Roorn
10 Area under Circulation 5.09
11 Proposed area for Hospital 2,256
12 Area for Parking . 0.70Th
13 Use to be decided later on[0*Additional land in possession of DDA noted during survey based map provided by LM
branch.
a. During the site visit and as per the PT Survey, it is observed that BPRD is in
possession of land in one pocket including the part area of the mandatory
green.
AREA FORRESIDENTIAL(EARLIER PROPOSEDFOR HOSPITAL &RECREATIONAL
POLICE POST
ESS(11KV) -
AREA UNDH GTiITN
ft 54 Ha I FROM GOVT. USETO RESIDENTIAL
FROM GOVT. USE.0.1 Ho 10 PUBLIC & SEMI-
P U BL IC
0.008 Ha NOT REQUIRED
0.1€: Hn NOT BLOUIDED
I)
I I
8
AREA UNDERCOMMERCIAL
AREA UNDER KALYANMANDAP & COMMUNITYHALL
AREA PROPOSED FORHOSP II AL
0.55 Ha FROM GOVT. USETO COMMERCIAL
FROM GOVT. USE1.27 Ha
1(1) PUBLIC & SEMI-PUBLIC
1.08 Indo
h. iiie Lands Department has ioeritiiied the land ;ur iospita
earmarked for the land to be aFlottcd to BPRO a easurinr 1.71 ha
.063 ha. land).
C. he land rice c: the laiI uiivai consjderaton r, Govt. land (Use
undetermined) and partly commercial as per MPD-2021.
d. I urther in MPD-2021, at chapter '8' under heads of Govt. Offices, it has been
noted that norms for the Govt. use (undetermined) shall be as per approved
layout plan/scheme which development control as per respective use
promises.
e. lands Department vide letter no1083/DD/LM/SWZ/2012/787 has intimated
that the land shown in the plan is DDA acquired land and possessed land
which is vacant at site. At present there is no court case on this land.
f. The feasibility and Total Station survey has been received from Engineering
Department on 19.02.2013.
g. The land allotted to BPRD, SSB, CISF in the Scheme area does not requirechange of land nse as these are covered in Government land use. The area
shown as commercial in the Scheme measuring 6.95 ha has already been
notified vide Gazette of India notification no. 5.0. 724 (E) dated 26.5.2005.
3.0. PROPOSAL:
Keeping in view the examination and estinp, developments as stated above, a corn rr'h
proposal has been worked out for the un-allotted vacant land based on the Total Stationreceived from Executive Engineer, S\VD 4. The details of the modification proposed are given
below:ow:
AREA AS PER i BOUNDARY DETAIL FORSL. DESCRIPTION OFLAND MODIFIED CHANGE OFLAND
POCKETS IN CHANGE OF LANDUSENO. USE PROPOSED PROPOSAL USE
(Approx.) - - -- -
, N.BPR&DLANDAREA F OR CREMATION
0 33 Ha 10 PUBLIC SEMI- S GREEN BUFFER.
GROUND (EXISTING)PUBLIC
E. 30 M ROAD
I .SB LANDM flIM( 1NIfl
ARFA UNDER rir 0 51 Had
S 30 M ROAD2
STATION - S C!SF LAND
-. - - - - -- -- VV: PROPOSED RESIDENTIAL3
N: 7.2 M EXISTING RODS: GREEN BUFFER, NH-8E: MAHIPALPUR VILLAGE
I W: 30 M. ROAD
N: PROP. COMMUNITY HALLS: VILLAGE MAHIPALPURE.ENCROACHMENT1UNAUTHORISED COLONY'A' PROP. UGRN: 30 M. ROADSt 72 M. ROADE PROPOSED 4 5 M. ROAD\N 30 M ROAD
N DEFENCE LANDS: BPR&D LAND an- 2. UE: DEFENCE LANDW: DEFENCE LAND
N: PROPOSED HOSPITALS: PROPOSED GREENE: 30.0 M ROADW: MAFUPALPUR VILLAGE
U
p
The above proposals to be constdeeC: nr the change of land use since the entire land is
Government land (use undetermined) which requires to be processed under section 11-A
of DD Act, 1957.
ii. The existing encroachment in the form of Arjun Camp with in 5.94 HA area to be considered for
In-Situ development/ Rehabilitation and the land be developed as residential area for which
detail proposal to he worked out b y Engineeri n g Department/HUPW.
11
The site profile for Delhi Jai Board has been modified vith 0.63 Ha. area to accommodate the
Kalyan Mandap / Community Hall.
iv Plan showing the modification is placed as Annexure-C.
V. Necessary permission shall all be obtained from Airport Authority of India for developing
Residential as well as Public & Semi-Public facilties for .vhich copy of the proposal will be sent to
Airport Authority for height clearance.
vi. Few structures are affected in the proposlil for construction of 6m. / 4m. Road along the
periphery of the village which is proposed for convenient movement by villagers requires to be
checked by Engineering Department for feasbility and construction.
vii. All the dimensions are approximate. The dimensions shown in the plan are to be confirmed by
engineering department.
4.0. RECOMMENDATION
The proposal as given in Para 3.0 above is placed before the Technical Committee along
for consideration and subsequent processing for Authority for change of landuse as
explained at Para 3 (i) above.
fl
Asstt. Dir.(AP)I
DDi(AP)l I) Director (AP)l
The proposal was presented by the Director (Pig.) Zone ('F' & 'H'). After detailed
deliberation, Technical Committee recommended the proposal as contained in Para3 of Agenda for further processing for Change of Land Use under section hA ofDD Act 1957 byAuthoñty and MoUD.
.J
r Action Director (P l.g) F&H, DDA• JOJU. Açj . -
I idr'- irPt''
ul • .neI ) ....,, ._,-1_.., •, . .......... , 0i ...........
to °.............1•
-
•:• H
rS•
f'•
/
/ .S •)
U S
/ Ø/ L
, I5-.
\\/ I
I/ . .
%11
S
/7
-
\\\\\\ iTrAll
Al
L pd I </
-
1
:
.SL.k
-•
-
/I •N '
H /\
r7Z . S
--S -
-S 54
I '-' Ivi
L /
Sp,
m
DELHI DEVELOPMENT AUTHORITYMASTER PLAN SECTION , 6TH FLOOR,VIKAS MINAR, NEW DELHI —110002
Dated 18.04.2013TEF. 1(4)I2013/MP I 1?
Sub: Minutes of the 4th Technical Committee Meeting held on 18.04.2013
The minutes of the meeting held on 0804.2013 have been put up for approval andthe same will be circulated to all the members shortly. The Chairman T.C. opinedthat in future the draft minutes should be put up for approval immediately so that themembers of Technical Committee get sufficient times to submit their observations.
Item No.1512013
Modification in the layout plan of land measuring 32.75 Ha at Village
Mahipalpur
F3(4)2005/MP
The proposal was presented by the Director (Pig.) Zone ('F' & 'H'). After detaileddeliberation, Technical Committee recommended the proposal as contained in Para3 of Agenda for further processing for Change of Land Use under section hA of
DD Act 1957 by Authority and MoUD.Action: Director (Pig) F&H, DDA
Item No.1612013
Change of Land Use of land measuring 3522 sqm (0.35 Ha) from 'Recreationaluse Zone (Protected Forests) to 'Transportation' at Sport Complex, HauzKhas, R.K. Puram for construction of Janakpuri (West) - Botanical Garden -Kalindi Kunj corridor of Delhi MRTS Project, Phase- III (Line-8).
F21(02)2013/MP
The proposal was explained by the Director (Pig) Zone ('F' & 'H'). The TechnicalCommittee recommended the proposal of Change of Land Use for the area measuring"3522 sqm (0.35 Ha) from Recreational use Zone (Protected Forests) to'Transportation' at Sport Complex, Hauz Khas, R.K. Puram for construction ofJanakpuri (West) - Botanical Garden - Kalindi Kunj corridor of Delhi MRTS Project,Phase- Ill (Line-8)" for further processing under section 11A of DD Act 957 by
Authority and MoUD.
Action: Director (Pig) F&H, DDA
Minutes of 4' Technical Committee meeting of 2013
Item No.1712013
Change of Land Use of land measuring 3753.Osqm on permanent basis forconstruction of lIT Metro Station on Janakpuri (West) Kalindi Kunj corridor of
Delhi MRTS Project, Phase-Ill.
F21(13)2011/MP
The proposal was presented by the Director (AP-1) Zone 'F' & 'H'. The Technical
Committee approved the proposal for Change of Land Use of land measuring3753.Osqm on a permanent basis for construction of lIT Metro Station on Janakpuri
(West) Kalindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processing
under section 1 1A of DD Act 1957 by Authority and MoUD.
Action: Director (AP-1) F&H, DDA
Item No.18/2013
Proposal of DTTDC Govt. of NCT of Delhi for construction of Delhi Haat forEast Delhi by covering Shandara Link Drain of Irrigation & Flood Department
along Noida Link Road at Mayur Vihar Ph-I
F20(1 )931MP
The proposal was explained by Director (Pig) Zone 'E' & '0. A Power Point
Presentation was also made by Consultant, DTTDC. After detailed deliberation, theTechnical Committee recommended the proposal of "DTTDC, Govt. of NCT of
Delhi, for construction of Delhi Haat for East Delhi by covering Shandara Link Drainof Irrigation & Flood Department along Noida link road at Mayur Vihar Ph-I" ascontained in Para 3 of Agenda for Change of Land Use and for further processing
under section hA of DD Act 1957, by Authority and MoUD.Action: Director (Pig) E&O, DDA
Meeting ended with vote of thanks to the Chair.
(l.P. PAR.ATE)Director (MPR&T C)
Copy to:
1 Vice Chairman, DDA2 Engineer Member, DDA3. Finance Member, DDA4. Pr. Commissioner (LD)5. Commissioner (Pig)6. Commissioner (LD)7 Commissioner (LM)8 Commissioner (EDMC)9. Chief Planner, TCPO10. Chief Architect, HUPW DDA11. Chief Architect, NDMC12. Chief Engineer (Property Development), DMRC13. Chief Engineer (Elect.), DDA14. Chief Town Planner, SDMC15. Chief Eng. Director Project-I, DJB16. Chief Architect, DMRC17. Addl. Commr.(Pig.) (infrastructure & UC)18. Addl. Comm r.(Plg.)TB&C, DDA19. Addl. Commr.(Plg.)UE&P, ODA20. Add[. commr.(Pig.) AP & MPPR.21. Addl. Commr. (Landscape), DDA22. Director (AP-1) F&H. DDA23. Director (AP) E&O, DDA
Minutes of 41h Technical Committee meeting 012013
Ac
Annexure -A1.
List of participants of 4th meetin g for the year 2013 of Technical Committee on
I 8.04.201DELHI DEVELOPMENT AUTHORITY
S/ShiMs.
1. Abhay Shina, Engineer Member DDA
2. J.B. Kshirsagar Commissioner (Pig), ODA
3. Savita Bhandari, Addl. Commr (Landscape),DDA
4. P.M. Parate, Addl. Commissioner (TC&B), DDA
5. Dr. S.P. Barisal, Add]. Commissioner (Pig)-1, DDA
6. Ashok Ghodeshwar, ACA-11, (F-IUPW), DDA
7. Sandeep Mehta, Chief Engineer (Elect.), DDA
8. I.P. Parate, Director. (Pig.)MPR&TC. DDA9 Tapan Mondai. Director (Pig) AP (E&O)10. P.K. Bhera, Director (Pig) Zone F&H. DDA11. M.K. Verma, Dy. Director (AP) E&O
12. Vijay Kumar, Engineer Member DDA
13. L&D.O.:Sunil Kumar Jam, Building Officer
14.NDMC:Rajeev Gupta, ArchitectP. Dinesh, Sr. Town Planner
15.SDMC:R.S. Nagar, Architect / Town Planner
16.DTTDC:Vivek Band. Sr. Executive (SP)Pradeep Sachdeva, ConsultantA.K. Singh, Executive EngineerS.B. Gupta, Executive Engineer
17.DMRC:P.S. Chauhan Chief Engineer (G)Sanjeev Malik, Dy. Chief Architect (Land)H.P. Mukhi, Manager (Land)P.S. Bisht, PM/LA
18. CPWD:Ashubsh Kumar Singh, Asstt. Architect
19. Delhi Police:Satyavir Singh, Asstt. Commissioner of Traffic (E)
Minutes of 411, Technical Committee meeting 012013
El -JjiDELHI DEVELOPMENT AUTHORITY
MASTER PLAN SECTION , 6TH FLOOR,VIKAS MINAR, NEW DELHI - 110002
F. 1(4)/2013/MP I
Dated 18.04.2013
Sub: Minutes of the 4th Technical Committee Meeting held on 18.04.2013
The minutes of the meeting held on 08.04.2013 have been put up for approval andthe same will be circulated to all the members shortly. The Chairman T.C. opined
that in future the draft minutes should be put up for approval immediately so that themembers of Technical Committee get sufficient time to submit their observations.
Item No.1512013
Modification in the layout plan of land measuring 32.75 Ha at VillageMahipalpur
F3(4)2005/M P
The proposal was presented by the Director (Pig.) Zone (F & H). After detailed
deliberation, Technical Committee recommended the proposal as contained in Para3 of Agenda for further processing for Change of Land Use under section 1 1A of
DD Act 1957 by Authority and MoUD.Action: Director (Pig) F&H, DDA
Item No.1612013
Change of Land Use of land measuring 3522 sqm (0.35 Ha) from 'Recreationaluse Zone (Protected Forests) to 'Transportation' at Sport Complex, HauzKhas, R.K. Puram for construction of Janakpuri (West) - Botanical Garden -Kalindi Kunj corridor of Delhi MRTS Project, Phase- Ill (Line-8).
F21(02)201 3/MP
The proposal was explained by the Director (Pig) Zone (F & 'H'). The TechnicalCommittee recommended the proposal of Change of Land Use for the area measuring"3522 sqm (0.35 Ha) from 'Recreational use Zone (Protected Forests) to'Transportation' at Sport Complex, Hauz Khas, R.K. Puram for construction ofJanakpuri (West) - Botanical Garden - Kalindi Kunj corridor of Delhi MRTS Project,Phase- Ill (Line-8)" for further processing under section hA of DD Act 957 by
Authority and MoUD.
Action: Director (Pig) F&H, DDA
Draft Minutes of 4 11, Technical Committee meeting of 201 3
lr^ -511
Item No.17/2013
Change of Land Use of land measuring 3753.Osqm on permanent basis forconstruction of lIT Metro Station on Janakpuri (West) Kalindi Kunj corridor of
Delhi MRTS Project, Phase-Ill.
F21(13)2011/MP
The proposal was presented by the Director (AP-1) Zone 'F' & H. The TechnicalCommittee approved the proposal for "Change of Land Use of land measuring3753.Osqm on a permanent basis for construction of ItT Metro Station on Janakpuri
(West) Katindi Kunj corridor of Delhi MRTS Project, Phase-Ill" for further processing
under section 1 1A of DD Act 1957 by Authority and MoUD.
Action: Director (AP-1) F&H, DDA
Item No.18/2013
Proposal of DTTDC Govt. of NCT of Delhi for construction of Delhi Haat forEast Delhi by covering Shandara Link Drain of Irrigation & Flood Department
along Noida Link Road at Mayur Vihar Ph-I
F20(1 )93/MP
The proposal was explained by Director (PIg) Zone 'E' & 0'. A Power Point
Presentation was also made by Consultant, DTTDC. After detailed deliberation, theTechnical Committee recommended the proposal of "DTTDC, Govt. of NCT of
Delhi, for construction of Delhi Haat for East Delhi by covering Shandara Link Drainof Irrigation & Flood Department along Noida link road at Mayur Vihar Ph-I" ascontained in Para 3 of Agenda for Change of Land Use and for further processingunder section 11 A of DD Act 1957, by Authority and MoUD.
Action: Director (Pig) E&O, DDA
Meeting ended with vote of thanks to the Chair.
(I. P. PARATE)Director (MPR&T C)
Copy to:
1 Vice Chairman, DDA2. Engineer Member, DDA3. Finance Member, DDA4. Pr. Commissioner (LO)5. Commissioner (Pig)6. Commissioner (LD)7. Commissioner (LM)8. Commissioner (EDMC)9. Chief Planner, TCPO10. Chief Architect, HUPW DDA11. Chief Architect, NDMC12. Chief Engineer (Property Development), DMRC13. Chief Engineer (Elect.), DDA14. Chief Town Planner, SDMC15. Chief Eng. Director Project-I, DJB16. Chief Architect, DMRC17. Addl. Commr.(PIg.) (Infrastructure & UC)18. Addl. Commr.(Plg.)TB&C, DDA19. Addl. Commr.(Plg.)UE&P, DDA20. Addl. Commr.(Plg.) AP & MPPR.21. Add!. Commr. (Landscape), DDA22. Director (AP-1) F&H, DDA23. Director (AP) E&O, DDA
Draft Minutes of 4th Technical Committee meeting of 2013 - -
Annexure -A
List of participants of 4th meeting for the year 2013 of Technical Committee on
18.04.2013DELHI DEVELOPMENT AUTHORITY
S/Sh./Ms.
1 Abhay Shina. Engineer Member DDA2. J B. Kshirsagar Commissioner (pig .). DDA
3 Savita Bhandari. AddI Cornmr (LandScape(.DDA4 P M. Parate, AddI Commissioner (TC&B). DDA5 Dr S P Bansal, Addi Commissioner (Pig)-L DDA6 Ashok Ghodeshwar, ACA-11, (HUPW) DDA7 Sandeep Mehta. Chief Engineer (Elect ) DDA
8. I.P. Parate. Director. (Plg.)MPR& TC DDA
9. Tapan Mondal, Director (Pig) AP (E&O)10 P.K Bhera, Director (Pig) Zone F&H, DDA1 11 MK. Verma. Dy Director (AP) E&O12 Vijay Kumar. Engineer Member DDA
13. L&D.O.:Sunil Kumar Jan Building Officer
14. NDMC:Rajeev Gu pta. ArchitectP Dinesh Sr Town Planner
15.SDMC:R,S Nagar Architect/ Town Planner
16. DTTDC:Vivek Band Sr. Executive (SP)Pradeep Sachdeva, ConsultantA K. Singh. Executive EngineerS B Gupta, Executive Engineer
17.DMRC:P S. Chauhan Chet EngineerSanjeev Malik, Dy Chief Architect (Land)H P Mukhi. Manager (Land)P.S. Bisht, PM/LA
18.CPWD:Ashush Kurnar Singh, Ass Architect
19. Delhi Police:Satyavir Singh Asstt Commissioner of Traffic (F)
Draft Minutes of 4 11, Technical Committee meeting of 2013
Annexure -A
List of participants of 4th meeting for the year 2013 of Technical Committee on
1804.2013DELHI DEVELOPMENT AUTHORITY
S/S h.IMs.
1 Abhay Shina. Engineer Member DDA
2. J.B Kshirsagar Commissioner (Pig). DDA3 Savrta Bhandari, Addi Commr (Landscape).DDA4 P.M. Parate, Addl. Commissioner (TC&B). DDA5 Dr. S P. Bansal, Addl. Commissioner (P19)-I. DDA6. Ashok Ghodeshwar, ACA-11, (HUPW). DDA7 Sandeep Mehta, Chief Engineer (Elect). DDA8 I P Parate. Director. (Pig )MPR& TC, DDA
9. Tapan Mondal. Director (Pig) AP (E&O)10. P.K. Bhera, Director (Pig) Zone F&H. DDA
11 M Verma, Dy. Director (AP) E&O12 Vijay Kumar, Engineer Member DDA
13. L&D.O.:Sunil Kumar Jam, Building Officer
14. NDMC:Rajeev Gupta, ArchitectP Dinesh. Sr Town Planner
15.SDMC:R.S. Nagar, Architect Town Planner
16. DTTDC:Vrvek Band, Sr Executive (SP)Pradeep Sachdeva, ConsultantA K Singh, Executive Engineer
S Gupta, Executive Engineer
17 DMRC:P S Chauhan Chief Engineer (C)Sanjeev Mairk, Dy Chief Architect (Land)H P Mukhi. Manager (Land)P S Bisht. PM'LA
18,CPWD:Ashubsh Kumar Singh. Asstt Architect
19. Delhi Police:Saty av ir Singh Asstt Commissioner of Traffic (E
Draft Minutes of 4 111 Technical Committee meeting of 2013
l \1('
DELI!! DEVELOI11ENT .\tT1I()RITYMASTER PLAN SI/('i'LO61' FLOOR. \IKAs II\AR
I .P Estate. New Delhi - 110002Phone Nu.2337007
F.1(4)/2013/MP/7
Date 16.04.2013
MEETING NOTICE
The 4th Technical Committee meeting of DDA will be held under theChairmanship of Vice Chairman, DDA on Thursday i,e. 18.04.2013 at 11:00 AM inthe Conference Hall, at 1st Floor, B-Block, Vikas Sadan, INA, New Delhi 110023.The lists of Items alongwith Agendas are enclosed.
It is requested to make i t convenient to attsnd the meeting
(I P. PARATE)'Director (MPR/TC)
Copy to:1. Vice Chairman, DDA2. Engineer Member, DDA3. Finance Member, DDA
Commissioner (Pig) .k. Commissioner (LD)
6. Commissioner (LM)7. Chief Planner, TCPO
.1 _-8. Chief Architect, HUPW DDA9. Chief Architect NDMC10. Chief Engineer (Property Development), DMRCii. Chief Enaineer (Fled) .Aflfl-- - ------ ---------.-
12. Addl. Comrnr.(Plg.) (Infrastructure & UC)Addl. Commr (PIg.)T8&C, DDA
14. Add(. Commr.(PIg.)UE&P,15 Addl. Commr.(Plg.) AP & MPPR-
—1-8AddI. Comrnr. (Landscape). DDA17. Secretary, DUAC18. Chief Town Planner, SDMC19. Sr. Architect. (HQ-1). CPWD, Nirman Bhawan20. Dy. Commr of Police (Traffic) Delhi21. Land & Development Officer, (L&DO)
Special Invitees
I. Pr. Commissioner (LD)II. Director (AP-1) F&H, DDA
Ill. Director (Pig) Zone E &O
NOO:
For itein No.
16/1315/13. 16/13, 17/1318/13
1. Chief Security Officer, Vikas Sadan2. Dy. Director (Horticulture) South, Vikas Sadan3. Asstt. Director Zone- 'A' &'B' for uploading the presentation in Computer at
Conference Hall4. A.E. (Maintenance) Civil, Vikas. Sadan5. AE. (Maintenance), Electrical Vikas Sadan6. Reception, Vikas Sadan
-l
I
F.1(4)1201 3/MP
DELI-11 DE\'ELOPj y1ENT ,.I.TFllORLTyiAS'FER PLAN SICTION(t 1 : 100k VIKAS HNAR.1' Lic. Ne Dcliii - I IIX)02
Phone o.2337111507
91-MEETING NOTICE
Date 16.04.2013
The 4" Technical Committee meeting of DDA will be held under theChairmanship of Vice Chairman, DDA on Thursday i.e. 18.04.2013 at 11:00 AM inthe Conference Hall, at 1st Floor, BBlock, Vikas Sadan, INA, New Delhi 110023.The lists of Items alongwith Agendas are enclosed.
It is requested to make it convenient to attend the meeting
(l.P. PARATE)Director (MPR1TC)
Copy to:
1, Vice Chairman DDA2. Engineer Member, DDA3. Finance Member DDA4. Commissioner (Pig)5. Commissioner (LD)6. Commissioner (LM)7. Chief Planner, TCPO8. Chief Architect, HUPW DDA
/9. Chief Architect NDMC10.Chief Engineer (Prope rty Development) . DMRC
Chief Engineer (Elect.), DDA12. Addl. Comrnr (Pig.) (infrastructure & UC)13. Addl. Commr.(PIg.)TB&c , DDA14, Addl. Commr.( Ig.)UE&P DDA15. Addl. Commr (Pig.) AP & MPPR.16. Addl. Commr. (Landscape), DDA4- Secretary, DUAC
Chief Town Planner, SDMCizi -Architect (HQ-1), CPWD. Nirman Bhawan
Commr of Police (Traffic) Delhi
!^z -—j? Land & Development Officer, (L&DO)
Special Invitees
I--,/-(^
I \ "
. I
For item No.
CI. Pr. Commissioner (LD)
H. Director (AP-1) F&H, DDA
ill. Director (Pig) Zone E &O
16/1315/13. 16/13, 17/1318/13
2
I)!'] .111 I)FVE1OI ' M INE .\ETIIORIT)\IAS1'1'R II.A\ sFc'rR)\( FLO( )l. V lk..\! \•IlN\R
1.1 1 [slate. Nev I )clhi 110002I'h()flC \o.233700'
F.1(4)/2013/MP/ 9 ^—MEETING NOTICE
Date 16.04.2013
The 4h Technical Committee meeting of DDA will be held under theChairmanship of Vice Chairman, DDA on Thursday i.e. 18.04.2013 at 11:00 AM inthe Conference Hall, at 1 Floor, B-Block, Vikas Sadan, INA, New Delhi 110023.The lists of Items alongwith Agendas are enclosed
It is requested to make jt conveniem to ae nd he nerttnq
(l,P PARATE)Director (MPR/TC)
Copy to:1 Vice Chairman, DDA2 Engineer Member. DDA3 Finance Member. DDA4 Commissioner (Pig)5. Commissioner (LD)6. Commissioner (LM)7 Chief Planner, TCPO8. Chief Architect, HUPW DDA9 Chief Architect, NDMC10 Chief Engineer (Property Development), DMRC11 Chief Engineer (Elect), DDA12. Addl. Cornmr.(Plg.) (Infrastructure & UC)13. Add!. Comm r,(Plg.)TB&C, DDA14 Addl. Commr.(PIg.)UE&P. DDA15. Addl. Cornmr.(Plg.) AP & MPPR.16. Addl. Commr. (Landscape). DDA17. Secretary, DUAC18 Chief Town Planner, SDMC19. Sr. Architect, (1-10-1), CPWD. Nirman Bhawan20. Dy. Commr. of Police (Traffic) Delhi21. Land & Development Officer. (L&DO)
Special Invilees For ileifl !\O.
I. Pr. Commissioner (LD)
16/13II. Director (AP-1) F&H, DDA
15/13, 16/13, 17/13
II!. Director (Pig) Zone F &O
18.113
1 -27
DF;Ll1 I I)F\FLOP\I l:\l Lii I( )RlF'\i.As'rI:R FI...\ SECTION
( !I.( )OR. \"Ik.\ \1INAR
1.1 1 Estate. l)tIhi iiPhone '().2337007
F.1(4)/2013/MP!7
Date 16.04.2013
MEETING NOTICE
The 4' Technical Committee meeting of DDA will be held under theChairmanship of Vice Chairman, DDA on Thursday i.e. 18.04.2013 at 11:00 AM inthe Conference Hall, at 1st Floor, B-Block, Vikas Sadan, INA, New Delhi 110023.The lists of Items alongwith Agendas are enclosed.
It is requested to make it convenient to attend the meeting
(I.P. PARATE)'Director (MPR/TC)
Copy to:1 Vice Chairman. DDA2. Engineer Member. DDA3. Finance Member, DDA4. Commissioner (PIg)5. Commissioner (LD)6. Commissioner (LM)7. Chief Planner, TCPO8. Chief Architect. HUPW DDA9. Chief Architect, NDMC10 Chief Engineer (Property Development), DMRC11. Chief Engineer (Elect.). DDA12. Addl. Cornmr.(Plg.) (Infrastructure & UC)13, Addl. Commr.(Plg.)TB&C, DDA14. Addl. Commr.(PIg )UE&P. DDA15 Addl. Commr.(Plg.) AP & MPPR.16. AddI Commr. (Landscape). DDA17. Secretary, DUAC18. Chief Town Planner, SDMC19. Sr. Architect. (HO-11), CPWD. Nirman Bhawan20. Dy. Commr. of Police (Traffic) Delhi21. Land & Development Officer. (L&D0)
Special Invitees For icni
I Pr. Commissioner (LD)
16/13II. Director (AP-1) F&H, DDA
15/13, 16/13, 17/13
Ill Director (PIg) Zone E &O
18/13
NOOChief Security Officer. Vikas Sadan
2. Dy Director (Horticulture) South, Vikas Sedan3. Asstt. Director Zone-'A' &'B' for uploading the presentation in Compute'
Conference Hall4 A.E. (Maintenance), Civil, Vikas Sedan5 AE. (Maintenance), Electrica. \/kas ao'an6 Reception. Vikas Sedan
INDEX
V
4th Technical Committee Meeting to be held on 18.04.2013
--
Modification in the layout plan of land measuring32.75 Ha at Village MahipalPUr
15/13 F3(4)2005/MP1-7
i Change ofLand Use of land measurin g 35.22 sqm
from Recreational use Zone (Protected Forests) toTransportation' at Sport Complex, Hauz Khas,
2. 16/13 R.K.Puram for construction of Janakpuri (West) -Botanical Garden - Kalindi Kunj corridor of DelhiMRTS Project. Phase- Ill (Line-8)F21(02)20131MP - - ._ --Change of Land Use of land measuring3753 Osqm on permanent basis for construction oflIT Metro Station on Janakpufl (West) Kalindi Kun;
3. 17/13 I corridor of Delhi MRTS Project Phase-IllF21(13)20111MP
riProposal of DTTDC Govt. of NCT of Delhi forconstruction of Delhi Haat for East Delhi bycovering Shandara link Drains of Irrigation & Flood
18(13Department along Noida link road at Mayur Vihar
4.Ph-I
F20(1)93/MP
19-25
8-12
13-18
2
INDEX
4th Technical Committee Meeting to be held on 18.04.2013
.NO.
UI3JECT PA(;v NO.
NO-
Modification in the layout plan of land measuring32.75 Ha at Village MahipalpUr I
15/13 F3(4)2005/MP I -7
dHnof Land Use of land measuring 5,22 sqrn -
from Recreational use Zone (Protected Forests) toTransportation at Sport Complex. Hauz Khas,
2. 16/13 R K Puram for construction of Janakpuri (West) - 8-12Botanical Garden - Kalindi Kun] corridor of DelhiMRTS Project. Phase- 111 (Line-8) I
F21(02)2013/MP
Change of Land Use of land measuring3753.Osqm on permanent basis for construction oflIT Metro Station on Janakpurl (West) Kalindi Kunj
3. 17113corridor of Delhi MRTS Project, Phase-Ill 13-18
F21(13)2011/MP
Proposal DC Govt. of Cof beforconstruction of Delhi Haat for East Delhi bycovering Shandara link Drains of Irrigation & Flood
18/13Department along Noida link road at Mayur Vihar 19-25
4.Ph-1
F20(1)93/MP
P
Item No. 5
Date
AGENDA FOR TECHNICAL COMMITTEE
No.: F3 (4)2005/MP
Subject:
Modification in the layout plan of land measuring 32.75 ha at Village
Mahipalpur.
1.0. BACKGROUND:
The proposal of utilization of 102 Bigha (approx. 8.6 ha) DD / Gram Sabha land alongNH-8 in village Mahipalpur was approved in the Screening Committee meeting held on
29.11.2005 vide item no. 121:2005 iii which provision for utilization of land for CRPF,
fire station, Commercial use, Recreational and sports were proposed. Location plan
placed as Annexure-A.
ii. Subsequently, the modified layout plan was considered in the Technical Committeemeeting held on 23.9.2008 vide item no. 144:08 for an area of 29.76 ha incorporating
the proposal for CRPF, fire station, Commercial use, Recreational and sports with
proposal for change of land use which was approved in principle.
iii. Modification in the layout plan was again placed before the Technical Committee
meeting held on 20.2.2009 vide item no. 12:09 with proposed modification in the
alignment plan of 30m wide road connecting NH-8 with Mehrauli Mahipalpur Road
which the proposal was approved for change of land use under Section 11 A of DO Act,
1957 as approved earlier in the meeting held on 23.9.2008 with the condition that
allotment of plots be made after actual demarcation of road at site.
iv. Considering the proposed under pass to the Airport from NH-8 approved in the
UT11PEC meeting held on 24.7.2009, and to accommodate the proposed underpass,
readjustment of the land allotted to BPRD, was placed before the Screening Committee
vide item no. 149:2009 dated 26.10.2009. The proposal for BPRD land in two pocketson either side of the proposed 30 M road was approved by the Screening Committee.
Plan is placed at Annexure-B.
v. Dy. Gen. Manager (I) vide letter no. NHAI/Tech,/Del- Gur./NH-8/IGIA/2008/1012 dated
22.2.2010 informed that the construction of Northern underpass project has beendropped, therefore, Defence & DDA land which was handed over to NHAI for the
project be handed over to them. This was also informed by A. Secretary, Mm. of Home
Affairs vide letter no. 23012/79/2009/PC dated 28.1.2010. Accordingly, themodification was proposed to restore the allotted to BPRD i.e. measuring 3.069 ha to
BPRD in one pocket which was placed before the 293rd Screening Committee meeting
vide Item No. 87:2010 dt15.7.2010 it was decided in the meeting that DDA should get
the clarification from the Ministry of Civil Aviation& Ministry of Road transport for
requiring of land in near future. Till such time the proposal is deferred.
vi. In the approved layout plan of Mahipalpur Village, a hospital site with an area
measuring 2.256 ha. was earmarked which is at present encroached by ihuggi dwellers
in the name of Arjun Camp. Therefore, the Hospital site could not be allotted to Health
and Family Welfare department of, NCT of Delhi. The concerned area MLA, Bijwasan
filed a complaint before the Public Grievance Commission that DDA has acquired 100
bighas of land in village and there is no Govt. Hospital for 15 to 20 Kms. in the vicinity
of the area.
vii. In the hearing of the Public Grievances Commission held on 17.4.12, Chairman, PGC
directed Pr. Secretary (H&FW) and Director OHS to arrange the meeting with Sr.
Officers of DDA to resolve the matter. In this context, a meeting was held on 18.5.2012
in the chamber of CLD, DDA with Director, OHS, CMO, Planning (OHS), CMO(HQ)DHS
13.063
Pkt. A-1.36P kt. B- 1.71
Area for BPR&Darl ier CRP F)
23
Area under SSBArea of Cremation Ground(Pvktinr
0.2970.383
and officers of ODA to discuss the issue relating to allotment of land for 200 bedded
hospital at Mahipalpur.
viii. The Lands Department Suggested the land lying vacant opposite BPRD land which is
part of approved layout plan of Mahipalpur village.
ix. The proposed land for Hospital identified by the Land Department was the siteearmarked for BPRD in the approved layout plan of Mahipalpur. However, the area ofBPRD has been adjusted on the opposite side as the under pass project has been
abandoned.
x. The proposal of the hospital on this land which was earlier earmarked for BPRDrequires modification in the plan and also involves change of land use from Govt. toPublic Semi-Public which is to be processed under Section 11A of DD Act, 1957.
xi. Delhi Jal Board has been allotted 0.63 ha of land for UGR in the scheme area with the
condition that the top surface to he kept as green.
xii. Considering the changes in the area profile and request for additional facilities, it wasdecided to work out a comprehensive project adjusting the existing and proposed
facilities.
xiii.The copy of the proposal was submitted to CE (SZ) for feasibility study/ total stationsurvey on 14.12.12 and 26.12.2012 and also handed over to Land Management
Department for ownership status on 14.12.12.
2.0. EXAMINATION:
The detailed land utilization proposal which was approved in the Screening Committee
meeting held on 26.10.09 are as under:
TOTAL SCHEME AREA: 32.75ha (29.75ha + 3 . Oha*). Copy of the plan is placed as
Annexure-B.
SI. No.- Description of Land Area (Ha)
0J _____
4 Area under Fire Station 0.90
5 Proposed Area under Recreational & Sports 2.0221
Area under CSF6,
7 Area under Commercial a)6.95
Area under_Green1.111
9IAr under Community Room0.205.09
10 Area under Circulation
ii Proposed area for Hospital 2.256
12 Area for Parking 0.70
13 Use to be decided later on3.00
*Additional land in possession of DDA noted during survey based map provided by LM
branch.
a. During the site visit and as per the PT Survey, it is observed that BPRD is inpossession of land in one pocket including the part area of the mandatory
green.
• b. The Lands Department has rdeitrned the lanu 10 C F'ropitai
earmarked for the land to he allotted to BPRD measuring 1.71 ha
1063 ha. land).
c. TIre land use of (lie
undetermined) and partly commercial as per MPD-2021.
d. -:rther in MPD-2021, at chapter '8 under heads of Govt. Offices, it has uuen
noted that norms for the Govt. use (undetermined) shall be as per approved
, out plan/scheme which development control as per respective
premIses.
e. L.rnds Department vide letter no1033/DD/LM/SWZ/2012/787 has intnnate:
hat the land shown in the plan is DDA acquired land and possessed land
',..'hich is vacant at site. At present there is no court case on this land.
f. The feasibility and Total Station survey has been received from Engineering
Department oil
g.he land allotted to BPRD, SSB, CISE in the Scheme area does not require
change of land use as these are covered in Government land use. The area
shown as commercial in the Scheme measuring 6.95 ha has already been
notified vide Ga7ette of India notification no. S.O. 724 (E) dated 26.5.2005.
3.0, PROPOSAL:
Keeping in view the examination ant existing developments as s -tated above, a comprehensive
proposal has been worked out for the un-allotted vacant land based on the Total Stationreceived from Executive Inginneer, SWD-4. [he details of the modification proposed are given
below:
CHANGE OFLANDBOUNDARY DETAIL FOR
USEPOCKETS IN CHANGE OFLAND
USE
N. BE R&D LAND
ROM GOVT. USES: GREEN BUFFER
PUBLICW SSB LAND--
- N. DEFENCE LAND -S 301 ROAD
-do-E 01SF LAND
- - W PROPOSED RESIDENTIAL
N 7 2 M EXISTING ROD
FROM GOVT USE S GREEN BUFFER, NH-8
TO COMMERCIAL E: MAHIPALPUR VILLAGEW: 30 M. ROAD
N: PROP COMMUNITY HALL
FROM GOVT, USE S. VILLAGE MAHIPALPURTo PUBLIC & SEMI- E:ENCROACHMENT1
PUBLIC UNAUTHORISED COLONYW. PROP. UGRN. 30 M. ROADS: 72 M. ROAD1.08 Ha
-do- E: PROPOSED 4.5 M. ROADW: 30 M ROAD
St.. DESCRIPTION OF LANDNO. USE PROPOSED
AREA FOR CREMATIONGROUND (EXISTING)
AREA UNDER FIRE2
STATION
AREA UNDERCOMMERCIAL
AREA UNDER KALYAN4 MANDAP & COMMUNITY
HALL
AREA AS PERMODIFIED
PROPOSAL(Approx.)
0.383 Ha
051 Ha
0 55 Ha
1 27 Ha
AREA PROPOSED FORHOSPITAL
AREA FORRESIDENTIAL
6 (EARLIER PROPOSEDFOR HOSPITAL &RECREATIONAL)
POLICE POST0.11 Ha
8ESS(11KV) -
- 000811a
9 AREA UNDER GREEN - 0.18 Ha
N DEFENCE LAND
FROM GOVT. USE S.. .TPR&D LAND and 30 M. ROAD
TO RESIDENTIAL F: DEFENCE LANDW: DEFENCE LAND
- FROM GOVT USEN HOSPITAL0: PROPOSED GREEN
TO PUBLIC &StMI- E' 30.0 M ROADPUBLIC
W: MAHIPALPUR VILLAGE
NOT REQUIRED -
NOT REQUIRED
5.94 I la
I. The above proposals to be considered for the change of land use since the entire land is
Government land (use undetermined) which requires to be processed under section 11-A
of DD Act, 1957.
ii. The existing encroachment in the form of Arjun Camp with in 5.94 HA area to be considered for
In-Situ development/ Rehabilitation and the land be developed as residential area for which
detail proposal to be worked out by Engineering Department/HUPW.
iii. The site profile for Delhi Jai Board has been modified with 0.63 Ha. area to accommodate the
Kalyan Mandap / Community Hall.
iv. Plan showing the modification is placed as Annexure-C.
V. Necessary permission shall all be obtained from Airport Authority of India for developing
Residential as well as Public & Semi-Public facilities for which copy of the proposal will be sent to
Airport Authority for height clearance
vi. Few structures are affected in the proposal for construction of 6m. / 4m. Road along the
periphery of the village which is proposed for convenient movement by villagers requires to be
checked by Engineering Department for feasibility and construction.
vii. All the dimensions are approximate. The dimensions shown in the plan are to be confirmed by
engineering department.
4.0. RECOMMENDATION
The proposal as given in Para 3.0 above is placed before the Technical Committee along
for consideration and subsequent processing for Authority for change of landuse as
explained at Para 3 (i) above.
(k-
Assft. Dir.(AP)I Dy. Dir. (AP)I Director (AP)I
I1:T1tjl\/ J
. L1iL-
*t'...
LI /r 7 / . . l /
/
\\\ \\
//
. Iv
LI /ij 1
't\4 M / I:LtI''
r
\ '
I H iZI
/ •
r
L Li. IDN .....
i,....///.
1
r'ITT
6;ji
..'
l
' -'"-.- -- • b
L
• Item No.Ii)3)TDate
AGENDA FOR TECHNICAL COMMITTEE
No.: F.21 (02) 2013/MP
Subject: Change of land use of land measuring 3522 sqm from Recreational Use Zone(Protected Forests) to Transportation at Sports Complex, Hauz Khas, R.K.
Puram for construction of Janak Pun (West)- Botanical Garden-Kalindi Kunj
Corridor of Delhi MRTS Project, Phase - Ill (Line-8).
1.0 BACKGROUND:
Chief Engineer (Gen.) DMRC vide letter dated 28.6.2011 has requested for allotment ofland measuring 6706.00 sq. m on permanent basis for Ancillary Bldg./Parking/Shaft,Entry/Exit Shaft Required for construction of Janak Purl (West)- Kalindi Kunj Corridor ofDelhi MRTS Project, Phase - III in file no.F34(24)2011/IL.
II. Further, VC, DDA vide note dated 2.3.12 in file bearing F34(24)2011/lL at page 6/Nagreed to handover the land of Pocket RKP-V (1056 sqm) and RKP-Vl (565 sqm) to DMRCand DMRC will have to go through Forest Department.
Ill. Subsequently, Chief Engineer(Gen.) DMRC has submitted the revised / modifiedproposal to DDA, vide letter no. DMRC/Land/15/DDA/JP/YV/1441/978 dated 13,12.2012(file no.F.34(34)2011/lL) for an area measuring 3522 sqm. in three pockets land onpermanent basis for Ancillary Bldg./Parking/Shaft, Entry/Exit Shaft.
2.0 EXAMINATION:
The proposal has been examined and following observation are made:
1. The DMRC requested for an area of 3522 sqm. distributed in three pockets i.e. RKP-1(820 Sqm.) for Entry & Exit, RKP-4 (1885 Sqm) for Ancillary Bldg/Shaft/Entry Exit & RKP-5 (817 Sqm.) for Entry Exit/Shaft and Parking. Location plan showing the site are placedas Annexure A.
II. As per observation of the landscape department, the proposed site are part of fullydeveloped District Park and also notified protected forest of Delhi Govt., whichrequires NOC from the Forest Department.
Ill. As per the Zonal Development Plan of Zone 'F', the land use is "Recreational", DistrictPark / Community Park / City Park/Reserve forest.
IV. As per provision of MPD-2021, Metro Stations along with property development(composite development) upto a maximum area of 3.0 ha. shall be permitted in all UseZones, except in Recreational and Regional Park / Ridge Use Zone, Lutyeins' BungalowZone and Heritage Zones, subject to approval of Technical Committee of DDA.
V. A joint inspection was conducted on 20.11.12 and 2.1.13 by Dir. Hort. (South East) withthe official of DMRC. As reported by Hart. Department on 2.1.13, 526 trees are affectedin the proposal. Annexed as Annexure —B.
VI. Since the area is falling in Recreational Use Zone District Park / Community Park / CityPark. (Protected Forest), the proposal will require change of land use to be processedunder Section 11-A of DD Act, 1957, from Recreational to Transportation.
Pe2.
PROPOSAL:
The details of the Pockets for Change of Land use from 'Recreational' (DistrictPark ) to 'Transportation' in 3 pockets i.e. RKP-1, RKP-4 & RKP-5 is as under andshown in the plan placed as Annexure 'C':
SLNo
Location of Land Present Basis Purposerequirement I-
RKP-1
820.00 sqm Permanent
Station Box, Entry!Exit
3. RKP-4
1885.00 sqm I Permanent
Ancillary I Shaft!Entry I Exit
R K P-S
817.00 sqni Permanent
Ancillary / ShaftParking
Total
3522.00 s
ii. The Change of Land use of an area measuring 3522 sq. m at Hauz Khas SportsComplex is required from 'Recreational' (District Park / Community Park / CityPark, Protected Forest) to 'Transportation' and to be processed under Section11-A of the DD Act, 1957 subject to the following:a. DMRC shall obtain clearances from Forest Department and other concerned
statuary Bodies since the land is falling within the reserved Forest area.
b. DMRC shall obtain necessary clearances from statuary authorities concernedfor cutting of trees, if required, and plant the required no. of trees, as per thestatuary requirement
c. No construction shall be allowed till final notification of Change of Land use isnotified by the Ministry of Urban Development, Govt. of India.
d. Ownership status shall be confirmed by land department before handingover the land to DMRC.
iii The boundary details are given below:
North Sports Field Complex / Woodland, Hauz KhasSouth: Outer Ring RoadEast: Woodland Hauz KhasWest: Africa Avenue
Copy of the plan showing the proposal as marked by Landscape Department i5placed as Annexure - C.
4.0 RECOMMENDATION:
Keeping in view the facts at Para 1 & 2, the proposal as explained at Para 3 is placed for
the consideration of Technical Committee
Asstt. Dir. (AP-1)
Dy. Dir. (AP-1)
Director (AP-1)
':•.'
I ,..
'lrfl,4
a voi (yf yJ Vt V 1j
'?/'J(1 )1 (Vl I R? / ( T f(1(:(i ct'
/c I/a H3
L7 / .. r)
- Cf I) 1'(
(A N 0
T p (2ZJ1( '-
c (1 t- 11 C Li Y(1
fv(?/.O.•.iL(ff/' [i ii J
ii PLJ.
- - -
(; ( (f'\ (\ Wt" (/11. . —
(? K
( \ /
(t ,/if J / 7 fe i A,.
( Al ,' ( •f 1)),/ ((I I (c
i: i i flo
61CAr,117.,'('/'7.
y i,'.r/ I
N .)(( 1)i ().(// V7
\ j&c /'if( . f) (, i /) (I;,çIi(
I C I ' C•' X
• tiE? ii- ('
t?. ( (' 1 ' • I ---
fit
( k/Am /1'I fio)
( (()
( v V )
1 ('V c - )
(j /'• ( ''.. .).
I . ) <( ' r j 0 ' 1j
:j I
•,
( c
(1- /\
SE
\)
j.t1'?1
i) \) v 1V
Jlf
u& kC4 if(.-
S
ii -
I
J1/I II)
ri
iff k I
I
t ? IuI\I'' I///I
'::' •.•.c't• .
I
;) •<
tN
T-5^
A
I, I•II
l\/ h'' 'i
(I
• . . •
•1
r
1ir i•,•i
'
J.:•3
I'p
Avri
0
I
I - — -
.' 1.
L' I
C-) !
C-)
0
51 •l
çti I— I
(
IJ 03 A-
/?r-
0) 1 0
(I I I 0
c1
I I
'I ••I
II / 0
rcl" I/I
28 wH
TO WA SARAI/ I
I / I II H
I II
N
I
- ..
•cI
_LJ .0 /
I r
L
--- -
0
/
0
-7
C)
0
C)
ClI 0 F-
I ''I> ) P1P z
P
C
I'. 4->z •
I l10.
L1
;
ri
OP.
cc
2
II ox qb
! .. -'.II Zr.F -hX. I) 113C-- Z •c'
4,:. - ----------C
e
0 — I ^5 - Item No. I
1/3
Date I'AGENDA FO R TECHNICAL COMMITTEE
No.: F.21 (13) 2011/MP
Subject: Change of land use of land measuring 3753.0 sq. m on permanentbasis for construction of lIT Metro station on Janak Purl (West)-Kalindi Kunj Corridor of Delhi MRTS Project, Phase - III.
1.0 BACKGROUND:
Chief Engineer (Gen.) DMRC vide letter dated 28.6.2011 has requested forallotment of land measuring 4851.00 sq. m on permanent basis for AncillaryBldg. & Entry/Exit Shaft Required for construction of Janak Purl (West)- KalindiKunj Corridor of Delhi MRTS Project, Phase - Ill.
II. Subsequently vide letter dated 11.4.2012, Chief Engineer (Gen.) DMRC hassubmitted an modified proposal for requirement of area 3753.0 sq. m forAncillary Bldg. & Entry Exit.
2.0 EXAMINATION:
The site under reference proposed by DMRC, for Ancillary Bldg. & Entry !Exit arelocated in the Houz Khas District Park Location plan showing the site is placed asAnnexure-A. The proposed 3 pockets IIT-2, 111-3 & 111-4, are part of the DistrictPark (Reserve Forest) and as per the MPD-2021 and Zonal Development Plan ofZone F, these sites are falling in the Recreation use zone i.e. District park (ReserveForest) Annexure-B.
I As per the provision of MPD-2021, Metro Stations along with property development(composite development) up to a maximum area of 3.0 ha shall be permitted in allUse Zones, except in Recreational and Regional Park ! Ridge Use Zone, Lutyens'Bungalow Zone and Heritage Zones, subject to approval of Technical Committee ofDDA.
111 As per the examination of Landscape Deptt., the site under reference is part of theDeveloped Rose garden. DMRC has desired 1035 sqm of land for Permanent basisfor Entry! Exit Shaft, and other 1631 sqm for Ancillary Bldg&1087 sqm for Entry /Exiton other side. A number of trees are affected in the proposal which includes 68Plrees & 230 Shrubs & Plants.The details of the affected Trees and other featuressubmitted by Dy. Director (Horticulture) are annexed as Annexure - C.
iv. Since the area is developed park, falls in the Recreational Use Zone it will requireChange of Land use from 'Recreational' (City Park,District Park, Communitypark(Reserved forest) to Transportation' under the provision of Section 11-A of theDDAct, 1957.
3.0 PROPOSAL:
The details of the 3 pockets i.e. IIT-2, 11T-3 & IIT-4 required for permanentAncillary Building, Entry! Exit & shaft is given below and shown in the planplaced as Annexure- D
'SLNo.Location of Land
1. 111-22. IIT-33. 111-4
Total
Presentrequirement1631.00 sqm1035.001087.00 sgm3753.00 scam
Basis
PermanentPermanentPermanent
Purpose
Ancillary BldyEntrylExit& ShaftEntry/Exit &Shaft
It
The Change of Land use of an area measuring 3753.0 sq. m in 3 Pocketsie. IIT-2, 111-3 & 111-4 as shown in the plan required for Ancillary Bldg,
-. )4--
• Entry/Exit & Shaft at Hous Khas District Park has been proposed from'Recreational' (City Park, District Park, Community park(Reserved forest)to Transportation with the following boundary description and to beprocessed under the provision of Section 11-A of the DD Act,1957 subjectto the following,
a. DMRC shall obtain clearances from Forest Department and otherconcerned statuary Bodies since the land is falling within the reservedForest area.
b. DMRC shall obtain necessary clearances from statuary authoritiesconcerned for cutting of trees, as per the statuary requirement and plantthe required number of trees as per statuary requirement.
c. No construction shall be allowed till final notification of Change of Landuse is notified by the Ministry of Urban Development, Govt. of India,
d. Ownership status shall be confirmed by land department before handingover the land to DMRC
iii. The details of Boundary are mentioned below.
North: District Park
South: Outer Ring road
East: Safdarjang Development Area
West: District park( Rose Garden)
4.0 RECOMMENDATION:
The proposal of Change of Land use from 'Recreational' ((City Park,District
Park, Community park(Reserved forest ) to Transportation' for an area
measuring 3753.0 sq. m in 3 Pockets as explained in para 3 and shown in the
plan placed at Annexure D is placed before the Technical Committee for its
consideration.
Asstt. Dir. (AP-1)
Dy. Dir. (AP-1)
Director (AP-1)
;:.
'A3
I
--
- --
I
\ iPlkyl
'IL0'N
__-
*.1'.1 ,i' .i :,. H •' •' ' . ' Nii 'I' j I -
'III 'IllCtbg
; ZZ^
I k r•.
- '
0
rwC6,
II
- a
••0
1.rnJfl
&D
LIT
TOQUT
F4-
N B 6 H
4çrç 29N
IIT
dew
rv
-z P4AT1ONAL H4ITTTUTE.Eor HEALTh & PAMtLY
= WELFAP.E
Oh I
SS
__ ___
:•::::
-
-
___ ____ ______ - - / :- •--
uLu
......................./
_______ ,-::-:-:-:-:-:-:':•::,•:-:-:-y-:•:••y- i-i- •:•:-•:•:•:-:•:•:-:•:::::
FmllN*Tto"
.•:-:-
- 1
>2:'1•; --'/ '2/,,';t//3' 1
HUL2
/// •/S/ •/// / 1/
W-LAGIE(ANOJjt / 1
•.... -,-. - S /
--
/.- ?t-
S__
•5/.- - 5,
--" - - , •// - /y - --.,
/ /// ///,.'
/
-5---
ANCiIXU*1 -C
HVA I
-. llie mi it surve y hac been coiiduc)cd with the cia If of I )M RC Lhe following features arc
tictine on the land winch lia\'e to he aliOt!flCTut () 1i2TieTi1 basis
I t(C 1'] nOt S
I.iiehtoot Nos.
2. S iras () Noc.
iuhtnrdiar 9 Nos
1 Necin I I Nos.
5. i'apdi 9 Nos.
(. Pilkhan I No.
7 Ihivet in 1 No.
Fucah'ptuS I Nos.
Iilir 61'1os.
lot al 6X Nos.
hrklbs Plants
•('liandni 42 Nos
I .istnnia Palm X Noc.
P o Ped 4 Nos. ((50 Nos. Plants))
I nial • 7 iI) is.
itares ci 1II.
L liectric light pnle O Nos.
1 lect nc leader nil I ' ll 1)1 No.
Pump 1ioic () I No.
Fxisling red hajri Path 7X3 219 Sqrn.
I tiiderginnnd (l pipe hue 11)51) Rinit.
( 1niitilar' va I xviI ¶1 (ri Ii 151 l 11!.
))
\I) tl( J( '2
SO (I I)
/
(i
0)
C)
2
, F-4CC) c
ZQDZ
- -oooO ru
( -> -"
zzp.)
0) or
3
0
DlC O<-. 1)0
° C0 -O
,
Wu11
EC
n
0)ØZ C) •CCO
ag
0
0)
-. 0•0z
o0)QC)
ICC)C)0)
0) Fx
Z •z r-
flu
90 M
U•
TOJIASARAI
tO
±
-F
.L 1/.
1 94
,+-I--
1g
-Fl T^'
•1
• -I--1 -I--
±-•I- + -F •A —
*± +1
-4 \ -1- + +
I+ +
+ + _± 4-• --
—
tl'sfb
V
(
0W1i C 6&7 and 0 f 0, upocIiveIy of :ne enclosed pIil.mincrrvreport.
hoposed width 0 project to be built over drain is of abou 40 in R/W.
During non-monsoon period water flaws through only the small central part of drain,'• .'hereos, on both the side-banks grew vege tation/plants. The Hoot design proposesI': estore the existing green along both s ides/banks of the drain so that-'nvironrnenja impcct is minimized.
66 KVA line is runnin g parallel to the drain. As such the issue of relocation,'fftng/or laying underground cable is -s
tated being taken up by DTTDC with-ri : ierned electricly supply department,
Gas FR VAT IONS:
2.3 - use of ho ':Clud 'i
2021.
2.3.1 .o.Jy iond measuring 1.2 Ha has been allotted to DTTDC atGeea Colony tm Dilli H.-eta Colony which remains unutilized sir-ce 2005.
2.4 '.'isions of MPD 2021 regarding Drainage system are:
Flood protection and storm water d ischarges which are inter-related,Effluent Irg ament should he provided at ouffai;s usinci advanced techniquocDrainage should be linked with the ecology and green networks by adopting theconcepts of Bio-drainage' and other measures.
e Drain is port of r 'r:.iii. dn:;,nace system a' Delhi having major Iwoirpects: flood protection and storm wcter discharge which are interrelated. MPD2021 suggested prohibition of blocka ge at natural depressions and drainage.nannels
2.5 Dc s'.ns issued regarding covering of drains are:
2.5,1OSD to Lc; vide dated 9.2.10 w.r.n rneetincj of RPG (Eriv.) held of Raj N0v or,
.'T.h.C'9 in context of City drains ro be covered for creating parking space' has di rec tedthe covering of drciThs will not be pemdtted in future"
2.3.2 In the 2 11 %, UTTIPEC governing bod y meeting held on 19.2.10 at 10-30 am., under.hmanship of Hon'ble L.G. of Delhi, in context of a proposal some drains to be covered.:reat:ng parking soace, if was decided that "No such covering of drain, henceforth willcc token up by any agency, apart Train toe works which have already been underhnke,m:f ese drains shc , uld be cleared and developed with ecolog;co! anc local
2. -.....Jm' of the site under reference as per MPD 2021 and ZDP of Zone 'E' is "JUify'
0 nr , w hereas os per Clause 5.10.2. ORGANlSD INFORMAL SECTOR (Hoot) of MF 2021ch 'activity like the proposed Dilli Haaf is a Commercial activity, which is not a perm'cih eii "it in tf LITI JTY '- Use Zone.
2.7 iw of MED 2021 provisions and the 21 UTTIPEC Governing Body decision, one of n'icjorucerns is Envircnn-enfa !mpact Assessment issue.
2.8 '' cc only a preiiminay project report wifh conceptual proposal abs been:'q'osal would Ieqiire A Project Report proved h y GNCTD incicafing the project :aa:t
arid dcc. ...... .lUred for CLU.
2 - 'e ur .p cs:hu''cIer rderence roqai"c fcIIa'A-irIc cie .arances -Lour rig nor-ninon period wafer flows only lhrorigh the small central
part of arain,v .'hereas, cn both the side-banks grew vegeial j on/planf5 DIIDC/ Irrigation andnicOdCniroI Department shall have to obtain necessary Envirorrmerfa! Clearances in thisregard
egarding sarm water flow durin g monsoon and its (drrninl C1eoninr: an
cJnt':nana- rom r Onc , mif ,: :,_.,.. • . IZ H
13
'Cl
4Item No: 18/2 : 31IC
AGENDA FOR TECHNICAL COMMITTEE
Sub: Proposal Of DTTDC Of GNCTD For Construction Of A DiUi Hoot For East Delhi By CoveringShandciro Link Drain Of Irrigation & Flood Control Departnient Along NOIDA-Link-Road At Mayur\Jihar Phase- I
r.40: F20 (01 )93/MP
BACKGROUND:
1.1 Managing Director DITDC Lid. vide hIs letter doled 38.12 to Vice Chairman DDA hasrequested for Development of Dull Hoot, Moyur Vihar, Ph.-I, Delhi. He has also informed thatHonbie MR Sh. Sandeep Dixif during his visit on 19.5.12 has desired that the feasibility ofconstruclion of Dilli Hoot for East Delhi by covering the open drain flowing along NOIDA-Link-Road, opposite Mayur Vihar Phase- I may be explored. Chief Engineer DflDC Ltd. Videotters dated 23.10.2012 & 12.03.2013 forwarded a minutes at Meeting of Chief Secretary.ONCI of Delhi held on 13.09.2012 and has requested for conveying the feasibility icrChange of Land Use for the covered portion of the Nallah /drain for the proposec:construction of a Dilli Hoot over the drain. A conceptual proposal/ plan of the site underreference have been enclosed along with. A copy of convey letter to DTTDC EngineeringDiv. from GNCTD Engineering Div. dated 12.03.2013 regarding Transfer of Irrigation & FloodControl Depft. Land on Long term Lease basis to DTTDC for construction of Dilli Hoot a:Mayur Vihar. Delhi was also enclosed. (ANNEXURE- I)
1.2 A copy of representation to CM, Delhi from the President of Vigyan Lok CGHS, Mayur Vrhas,Ph-I has also been received through CE(EZ) DDA in which the CGHS stated that theconstruction of such project will provide spaces for community/ conference hall, plazmlibrary and parking etc. besides minimizing/solving the causes of health hazard and protectthe environment. Also stated that some other societies! RWAs have made similarrepresentations to CM. Delhi.
2.0 EXAMINATION:
2.1 As per the conceptual proposal I location pbin for Acirded by Managing Director DIIDC,the site u/r forms part of and along Shandarci Drain, Mayur Vihar Phase - I near MetroStation. The DTTDC, GNCTD submitted the proposal for developing a Dull Hoot for eastI)eIhi by covering Shandara Link Drain of I & FC (Irrigation & Flood Control) Department(situated between RD 2915 rn to RD 2315rn) measuring 27000 sqrn (600 X 45 m) approx. TheI & FO Department has leased out the portion under reference to DTTDC on long termbasis (for 99 years). Responsibility of maintenance and do- silting of drain on the coveredportion including operation of outfall structures will be of DTTDC. This has already beenagreed upon in a meeting of Chief Secretary of Delhi in a meeting held on 13.9.2012. It isalso stated in the letter of I & FC Department that the allottee i.e. DTTDC will use the landonly for the purpose for which ills allotted & not for any other purpose.
2.2 DTI'DC submitted only a Preliminary Project Report, May. 2012 of the proposed LCI Hoot
covering .Shandara drain situated along NOIDA LinK Road, app. Mayur Vihar, Ph- I. The siteis parallel to Metro Line aligned along the drain & at a distance of about 500m fromAkshardham temple. Easy accessibility from the Mayur Vihar Ph-I Metro Station would beavailable. Proposed activities as per Zoning Plan cf rite as per the enclosed submitied PrelirnProject Report of DTTDC ore:-
Cr) Craft Shop tI Food CourtL) Amphitheatre g Vehicular entry/ parkingci Security and office t:nrice Entry:1) General Amenities
Ticket Counters
Conceptual proposal of alignment plan and cross-section over the covered drain andcroposed use activities like craft shops, food olaLo, general amenities, and amphJheater
3.2
NOC br covering of drain with rurpec:! c 3e decision of the 21 s! UP IPEC (3cverninciBody meeting held on 19.02.20 10 under chairmanship of Honble LG d cuy nc1cover drain, henceforth.
iv. NOC with regard to existing 66 KVA overhead lines running along the prooc' 'PClearances from UUIPEC with respect to comprehensive traffic circulation syIc!n,entry/ exit, to the project area, parkin g e t c. with respect to abutting Delhi- NVLiti
and oh- Er roads under irflJE:c'' I'
3.0
PROPOSAL:
3.1 The proposal is for Change of Landuse (CU) from UTILITY (U5 DRAIN) to COMMERCIAL(5.10.2 ORGANISED INFORMAL SECTOR
PLACES (Haat)) in respect of the Land (sHuatec:between RD 2915 m to RD 2315m) measuring 2/000 sqm (600 X 45 m) approx. fordeveloping a Dilli Haat for east DeIhi b y overir..j .Pchdaro Link Drain of! & FC (Ho :icr) PFiod Control) Department.
ih area i s bounded by -
Shandarc Lir.. /:r-i'SOUTH Shandara Link Drain siretcuEAST Mayur Vihar Phase-I, MRTS Line, Ce.. Housing SocietiesNEST : Delhi-Noida-Link Road (ME Road 60 in R/W)Development controls as per Table 5.4 of MPD-202 1 as under shall be applicable:
3,.!
Jse/ Use Max. Coverage FAR HeightP remises (%) (mts)O rganised 1 40
1-Informal zar J
40 8
3.3 A low intensify development is to be proposed.
Parking sfd, -ECS/ 100 sqm of FL area
3.4 Ihe proposal would be subject to following clearc'-i1. EIA Clearance from Department of Environmer-;2. Clearance from Flood & Irrigation Dept.3. NOC for covering of drain with respect to th
Body meeting held on 19.02.2010 unde r chairmansnip of HanDle LG.
;.Clearances from UTTIPEC with respect to comprehensive traffic circulation system,
entry/exit, to the project area, parking etc. with respeci to abutting Delhi- No jdaLink Roai crudother roads under influence.5. NOC with regard to existing 66 KVA overhead lines running along the
proposed 0 .6. Tree cutting permission.7. NOC from DMRC and surrounding CGHS.
Tue above proposal of Change of Landuse in MPD-202 I and ?DP of Zone -'E' under Section] 1 A ofDD Act is to be submitted to the Authority for ccrsidera;u;
4.0 RECOMMENDATION:In view of the above facts (Pat(, I & Thu p rolooscil mentioned at Para - 3. is
Placed before the T.C. for appropriate decision, subject to compliance of the requiredas mentioned in Para 3.4,
- /
Dy. Dir. (AF! Zone-UPO' As::P, Dir. (AR) Zone-
- -.\•. .
/ I
-'--
lowH Az '
LLI
r -:
LU
Nf)
ciu
- D CL
pq
Ui
-
- \
N
• I " : .-
\ N \ 'A - -
\ç1\ !
-I its
>T --\ )'--
C? ;
141
1JI.
Lill
ci