Water Supply Plan
Edina, Minnesota January 28, 2020
Formerly called Water Emergency & Water Conservation Plan
2
For more information on this Water Supply Plan Template, please contact the DNR Division of Ecological and Water Resources at (651) 259-5034 or (651) 259-5100.
Copyright 2015 State of Minnesota, Department of Natural Resources
This information is available in an alternative format upon request.
Equal opportunity to participate in and benefit from programs of the Minnesota Department of Natural Resources is available to all individuals regardless of race, color, creed, religion, national origin, sex, marital status, public assistance status, age, sexual orientation, disability or activity on behalf of a local human rights commission. Discrimination inquiries should be sent to Minnesota DNR, 500 Lafayette Road, St. Paul, MN 55155-4049; or the Equal Opportunity Office, Department of the Interior, Washington, DC 20240.
3
Table of contents INTRODUCTION TO WATER SUPPLY PLANS (WSP) ............................................................... 6
Who needs to complete a Water Supply Plan ........................................................................... 6
Groundwater Management Areas (GWMA) .............................................................................. 6
Benefits of completing a WSP ................................................................................................... 6
WSP Approval Process ............................................................................................................. 7
PART 1. WATER SUPPLY SYSTEM DESCRIPTION AND EVALUATION.................................. 9
A. Analysis of Water Demand ................................................................................................. 9
B. Treatment and Storage Capacity ..................................................................................... 11
Treatment and storage capacity versus demand ........................................................................... 15
C. Water Sources ................................................................................................................. 15
Limits on Emergency Interconnections .......................................................................................... 16
D. Future Demand Projections – Key Metropolitan Council Benchmark .............................. 16
Water Use Trends ........................................................................................................................... 16
Projection Method .......................................................................................................................... 17
E. Resource Sustainability .................................................................................................... 18
Monitoring – Key DNR Benchmark ................................................................................................. 18
Water Level Data ............................................................................................................................ 20
Potential Water Supply Issues & Natural Resource Impacts – Key DNR & Metropolitan Council Benchmark ...................................................................................................................................... 22
Wellhead Protection (WHP) and Source Water Protection (SWP) Plans ....................................... 31
F. Capital Improvement Plan (CIP) ...................................................................................... 31
Adequacy of Water Supply System ................................................................................................. 31
Proposed Future Water Sources ..................................................................................................... 33
Water Source Alternatives - Key Metropolitan Council Benchmark .............................................. 33
PART 2. EMERGENCY PREPAREDNESS PROCEDURES ..................................................... 34
A. Emergency Response Plan .............................................................................................. 34
B. Operational Contingency Plan ......................................................................................... 34
C. Emergency Response Procedures .................................................................................. 34
4
Emergency Telephone List .............................................................................................................. 35
Current Water Sources and Service Area ....................................................................................... 35
Procedure for Augmenting Water Supplies .................................................................................... 35
Allocation and Demand Reduction Procedures .............................................................................. 36
Notification Procedures .................................................................................................................. 38
Enforcement ................................................................................................................................... 39
PART 3. WATER CONSERVATION PLAN ................................................................................ 40
Progress since 2006 ................................................................................................................ 40
A. Triggers for Allocation and Demand Reduction Actions ................................................... 41
B. Conservation Objectives and Strategies – Key benchmark for DNR ............................... 42
Objective 1: Reduce Unaccounted (Non-Revenue) Water loss to Less than 10% .......................... 42
Objective 2: Achieve Less than 75 Residential Gallons per Capita Demand (GPCD) ...................... 44
Objective 3: Achieve at least 1.5% annual reduction in non-residential per capita water use ...... 45
Objective 4: Achieve a Decreasing Trend in Total Per Capita Demand .......................................... 46
Objective 5: Reduce Ratio of Maximum day to the Average Day Demand to Less Than 2.6 ......... 47
Objective 6: Implement Demand Reduction Measures ................................................................. 47
Objective 7: Additional strategies to Reduce Water Use and Support Wellhead Protection Planning .......................................................................................................................................... 49
Objective 8: Tracking Success: How will you track or measure success through the next ten years? .............................................................................................................................................. 50
C. Regulation ........................................................................................................................ 50
D. Retrofitting Programs ....................................................................................................... 51
Retrofitting Programs ..................................................................................................................... 51
E. Education and Information Programs ............................................................................... 52
Proposed Education Programs ....................................................................................................... 52
PART 4. ITEMS FOR METROPOLITAN AREA COMMUNITIES ............................................... 56
A. Water Demand Projections through 2040 ........................................................................ 56
B. Potential Water Supply Issues ......................................................................................... 56
5
C. Proposed Alternative Approaches to Meet Extended Water Demand Projections........... 56
D. Value-Added Water Supply Planning Efforts (Optional) ................................................... 57
Source Water Protection Strategies ............................................................................................... 57
Technical assistance ........................................................................................................................ 57
GLOSSARY ................................................................................................................................ 58
Acronyms and Initialisms ......................................................................................................... 60
APPENDICES TO BE SUBMITTED BY THE WATER SUPPLIER............................................. 60
Appendix 1: Well records and maintenance summaries ........................................................ 60
Appendix 2: Water level monitoring plan ................................................................................ 60
Appendix 3: Water level graphs for each water supply well .................................................... 60
Appendix 4: Capital Improvement Plan ................................................................................... 60
Appendix 5: Emergency Telephone List ................................................................................. 60
Appendix 6: Cooperative Agreements for Emergency Services ............................................ 60
Appendix 7: Municipal Critical Water Deficiency Ordinance ................................................... 60
Appendix 8: Graph of Ten Years of Annual Per Capita Water Demand for Each Customer Category .................................................................................................................................. 60
Appendix 9: Water Rate Structure .......................................................................................... 60
Appendix 10: Ordinances or Regulations Related to Water Use ............................................ 60
Appendix 11: Implementation Checklist ................................................................................. 60
Appendix 12: Sources of Information for Table 10 ................................................................. 60
6
DEPARTMENT OF NATURAL RESOURCES – DIVISION OF ECOLOGICAL AND WATER RESOURCES AND METROPOLITAN COUNCIL
INTRODUCTION TO WATER SUPPLY PLANS (WSP)
Who needs to complete a Water Supply Plan Public water suppliers serving more than 1,000 people, large private water suppliers in designated Groundwater Management Areas, and all water suppliers in the Twin Cities metropolitan area are required to prepare and submit a water supply plan.
The goal of the WSP is to help water suppliers: 1) implement long term water sustainability and conservation measures; and 2) develop critical emergency preparedness measures. Your community needs to know what measures will be implemented in case of a water crisis. A lot of emergencies can be avoided or mitigated if long term sustainability measures are implemented.
Groundwater Management Areas (GWMA) The DNR has designated three areas of the state as Groundwater Management Areas (GWMAs) to focus groundwater management efforts in specific geographies where there is an added risk of overuse or water quality degradation. A plan directing the DNRs actions within each GWMA has been prepared. Although there are no specific additional requirements with respect to the water supply planning for communities within designated GWMAs, communities should be aware of the issues and actions planned if they are within the boundary of one of the GWMAs. The three GWMAs are the North and East Metro GWMA (Twin Cities Metro), the Bonanza Valley GWMA and the Straight River GWMA (near Park Rapids). Additional information and maps are included in the DNR Groundwater Management Areas webpage.
Benefits of completing a WSP Completing a WSP using this template, fulfills a water supplier’s statutory obligations under M.S. M.S.103G.291 to complete a water supply plan. For water suppliers in the metropolitan area, the WSP will help local governmental units to fulfill their requirements under M.S. 473.859 to complete a local comprehensive plan. Additional benefits of completing WSP template:
• The standardized format allows for quicker and easier review and approval • Help water suppliers prepare for droughts and water emergencies. • Create eligibility for funding requests to the Minnesota Department of Health (MDH) for the
Drinking Water Revolving Fund. • Allow water suppliers to submit requests for new wells or expanded capacity of existing wells. • Simplify the development of county comprehensive water plans and watershed plans. • Fulfill the contingency plan provisions required in the MDH wellhead protection and surface
water protection plans. • Fulfill the demand reduction requirements of Minnesota Statutes, section 103G.291 subd 3
and 4.
7
• Upon implementation, contribute to maintaining aquifer levels, reducing potential well interference and water use conflicts, and reducing the need to drill new wells or expand system capacity.
• Enable DNR to compile and analyze water use and conservation data to help guide decisions. • Conserve Minnesota’s water resources
If your community needs assistance completing the Water Supply Plan, assistance is available from your area hydrologist or groundwater specialist, the MN Rural Waters Association circuit rider program, or in the metropolitan area from Metropolitan Council staff. Many private consultants are also available.
WSP Approval Process 10 Basic Steps for completing a 10-Year Water Supply Plan
1. Download the DNR/Metropolitan Council Water Supply Plan Template from the DNR Water Supply Plan webpage.
2. Save the document with a file name with this naming convention: WSP_cityname_permitnumber_date.doc.
3. The template is a form that should be completed electronically. 4. Compile the required water use data (Part 1) and emergency procedures information (Part 2) 5. The Water Conservation section (Part 3) may need discussion with the water department,
council, or planning commission, if your community does not already have an active water conservation program.
6. Communities in the seven-county Twin Cities metropolitan area should complete all the information discussed in Part 4. The Metropolitan Council has additional guidance information on their Water Supply webpage. All out-state water suppliers do not need to complete the content addressed in Part 4.
7. Use the Plan instructions and Checklist document from the DNR Water Supply Plan webpage to insure all data is complete and attachments are included. This will allow for a quicker approval process.
8. Plans should be submitted electronically using the MPARS website – no paper documents are required.
9. DNR hydrologist will review plans (in cooperation with Metropolitan Council in Metro area) and approve the plan or make recommendations.
10. Once approved, communities should complete a Certification of Adoption form, and send a copy to the DNR.
8
Complete Table 1 with information about the public water supply system covered by this WSP.
Table 1. General information regarding this WSP
Requested Information Description DNR Water Appropriation Permit Number(s) 1973-1119 Ownership ☒ Public or ☐ Private Metropolitan Council Area ☒ Yes or ☐ No (Hennepin) Street Address 4801 West 50th Street City, State, Zip Edina, Minnesota, 55424 Contact Person Name Brian Olson
Title Public Works Director Phone Number 952.826.0311
MDH Supplier Classification Municipal
9
PART 1. WATER SUPPLY SYSTEM DESCRIPTION AND EVALUATION The first step in any water supply analysis is to assess the current status of demand and availability. Information summarized in Part 1 can be used to develop Emergency Preparedness Procedures (Part 2) and the Water Conservation Plan (Part 3). This data is also needed to track progress for water efficiency measures.
A. Analysis of Water Demand Complete Table 2 showing the past 10 years of water demand data.
• Some of this information may be in your Wellhead Protection Plan. • If you do not have this information, do your best, call your engineer for assistance or if
necessary leave blank.
If your customer categories are different than the ones listed in Table 2, please describe the differences below:
The customer categories used are the same as listed in Table 2.
10
Table 2. Historic water demand (see definitions in the glossary after Part 4 of this template)
Year Pop. Served
Total Connections
Residential Water
Delivered (MG)
C/I/I Water
Delivered (MG)
Water used for
Non-essential
Wholesale Deliveries
(MG)
Total Water
Delivered (MG)
Total Water
Pumped (MG)
Water Supplier Services
Percent Unmetered
/ Unaccount
ed
Average Daily
Demand (MGD)
Max. Daily
Demand (MGD)
Date of Max.
Demand
Residential Per Capita Demand (GPCD)
Total per capita
Demand (GPCD)
2007 47,786 13,330 1,900.00 644.40 - - 2,544.40 2,690.63 NA 5.43% 7.37 16.69 6/20/2007 109 146
2008 47,837 13,300 1,740.00 577.70 - - 2,317.70 2,692.34 NA 13.91% 7.38 16.29 NA 100 133
2009 47,889 13,266 1,776.14 331.54 - - 2,279.58 2,772.63 171.91 17.78% 7.60 18.75 9/22/2009 102 130
2010 47,941 13,074 1,299.66 372.93 - - 1,878.79 2,478.38 206.20 24.19% 6.79 13.13 8/6/2010 74 107
2011 48,262 13,074 1,626.57 543.38 - - 2,374.32 2,521.79 204.37 5.85% 6.91 14.12 9/13/2011 92 135
2012 48,829 13,080 1,833.95 597.00 - - 2,662.78 2,778.60 231.82 4.17% 7.61 17.08 7/11/2012 103 149
2013 49,216 13,100 1,655.87 535.91 - - 2,404.36 2,427.83 212.59 0.97% 6.65 15.78 8/28/2013 92 134
2014 50,261 13,140 1,523.99 545.84 - - 2,314.37 2,368.42 244.54 2.28% 6.49 15.45 8/14/2014 83 126
2015 50,766 13,140 1,514.77 533.77 - - 2,294.04 2,302.35 245.50 0.36% 6.31 12.70 8/4/2015 82 124
2016 51,804 13,140 1,395.52 495.60 - - 2,115.07 2,207.28 223.95 4.18% 6.05 12.99 6/28/2016 74 112
2017 51,958 14,335 1,474.22 523.74 - - 2,122.41 2,171.90 127.75 2.28% 5.95 12.5 7/11/2017 78 112
Avg. 2012-2017
50,472 13,323 1,565 538 - - 2,317 2,376 214 0 6.5 14 42,029 85 129
MG – Million Gallons MGD – Million Gallons per Day GPCD – Gallons per Capita per Day
See Glossary for definitions. A list of Acronyms and Initialisms can be found after the Glossary.
11
Complete Table 3 by listing the top 10 water users by volume, from largest to smallest. For each user, include information about the category of use (residential, commercial, industrial, institutional, or wholesale), the amount of water used in gallons per year, the percent of total water delivered, and the status of water conservation measures.
Table 3. Large volume users
Customer Use Category (Residential, Industrial, Commercial, Institutional, Wholesale)
Amount Used (Gallons per Year)
Percent of Total Annual Water Delivered
Implementing Water Conservation Measures? (Yes/No/Unknown)
1. PETERSON GROUP RESIDENTIAL 671.23 4.25% UNKNOWN 2. FAIRVIEW HOSPITAL INSTITUTIONAL 638.36 4.03% UNKNOWN 3. SOUTHDALE MALL COMMERCIAL 216.44 1.37% UNKNOWN 4. HERITAGE OF EDINA, INC.
RESIDENTIAL 180.82 1.15% UNKNOWN
5. GALLERIA SHOPPING CENTER
COMMERCIAL 172.60 1.09% UNKNOWN
6. DURHAM APARTMENTS
RESIDENTIAL 172.60 1.09% UNKNOWN
7. YORK PLAZA APARTMENT
RESIDENTIAL 161.64 1.02% UNKNOWN
8. EDINBOURGH CONDOMINIUMS
RESIDENTIAL 147.95 0.94% UNKNOWN
9. POINT OF FRANCE RESIDENTIAL 128.77 0.82% UNKNOWN 10. 7500 YORK COOPERATIVE
RESIDENTIAL 128.77 0.80% UNKNOWN
B. Treatment and Storage Capacity Complete Table 4 with a description of where water is treated, the year treatment facilities were constructed, water treatment capacity, the treatment methods (i.e. chemical addition, reverse osmosis, coagulation, sedimentation, etc.) and treatment types used (i.e. fluoridation, softening, chlorination, Fe/MN removal, coagulation, etc.). Also describe the annual amount and method of disposal of treatment residuals. Add rows to the table as needed.
12
Table 4. Water treatment capacity and treatment processes
Treatment Site ID (Plant
Name or Well ID)
Year Constructed
Treatment Capacity
(GPD)
Treatment Method
Treatment Type
Annual Volume
of Residuals (gallons)
Disposal Process
for Residuals
Do You Reclaim
Filter Backwash
Water?
Community Center
(WTP 2) 1961 4,320,000 Pressure
Filter;
Iron and Manganese
Removal; 577,700
To Sanitary Sewer
3,837,300 gallons
reclaimed
Fred Richards (WTP 3)
1963 2,880,000 Pressure Filter;
Iron and Manganese
Removal; 522,000
To Sanitary Sewer
4,518,000 gallons
reclaimed
Alden Park (WTP 4) 1964 2,880,000 Pressure
Filter;
Iron and Manganese
Removal; 0
To Sanitary Sewer
4,006,000 gallons
reclaimed
Granview (WTP 6) 2012 5,544,000 Pressure
Filter;
Iron and Manganese
Removal 2,947,000
To Sanitary Sewer
16,827,000 gallons
reclaimed
Well 2 1935 1,224,000 WTP 6; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 3 1946 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Well 4 1950 1,440,000 WTP 2; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 5 1950 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Well 6 1954 1,440,000 WTP 2; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 7 1955 1,440,000 WTP 6; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
13
Treatment Site ID (Plant
Name or Well ID)
Year Constructed
Treatment Capacity
(GPD)
Treatment Method
Treatment Type
Annual Volume
of Residuals (gallons)
Disposal Process
for Residuals
Do You Reclaim
Filter Backwash
Water?
Well 8 1953 1,224,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Well 9 1957 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Well 10 1963 1,440,000 WTP 3; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 11 1963 1,440,000 WTP 3; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 12 1964 1,440,000 WTP 4; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 13 1964 1,440,000 WTP 4; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 15 1964 1,440,000 WTP 6; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 16 1967 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Well 17 1967 1,440,000 WTP 2; Chlorine
Disinfection; Fluoride;
Polyphosphates
NA NA NA Chemical Injection
Well 18 1970 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
14
Treatment Site ID (Plant
Name or Well ID)
Year Constructed
Treatment Capacity
(GPD)
Treatment Method
Treatment Type
Annual Volume
of Residuals (gallons)
Disposal Process
for Residuals
Do You Reclaim
Filter Backwash
Water?
Well 19 1973 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Well 20 1989 1,440,000 Chemical Injection
Chlorine Disinfection;
Fluoride; Polyphosphates
NA NA NA
Total NA 41,112,000 NA NA NA NA NA
Complete Table 5 with information about storage structures. Describe the type (i.e. elevated, ground, etc.), the storage capacity of each type of structure, the year each structure was constructed, and the primary material for each structure. Add rows to the table as needed.
15
Table 5. Storage capacity, as of the end of the last calendar year
Structure Name Type of Storage Structure
Year Constructed
Primary Material Storage Capacity (Gallons)
Gleason Tower Elevated Spherical 1970 Steel 1,000,000 Community Center Tower Elevated Legged 1955 Steel 500,000 Southdale Tower Elevated Spherical 1956 Steel 500,000 Van Valkenburg Tower Elevated Composite 1989 Steel/Concrete 1,000,000 Dublin Street Reservoir Ground storage 1960 Concrete 4,000,000 Total NA NA NA 7,000,000
Treatment and storage capacity versus demand
It is recommended that total storage equal or exceed the average daily demand.
Discuss the difference between current storage and treatment capacity versus the water supplier’s projected average water demand over the next 10 years (see Table 7 for projected water demand):
The City of Edina has a storage capacity of 7.0 MG. The projected average day demand for the year 2040 is estimated to be 9.92 MGD. Current capacity will not meet storage requirements projected for the 2040 average day demand, based on the average day sizing criteria. Additional, as part of the City’s water supply planning process, an additional water storage needs evaluation was completed that accounted for reliable water supply available with auxiliary power. This storage needs calculation assumes that the amount of water storage held for emergency reserve can be reduced based on the availability of backup power at well supply facilities. This alternative sizing criteria calls for ½ Average day + equalization storage + fire reserve which equates to a total 2040 storage need of 6.4 MG. Though the City’s current nominal capacity (7.0 MG) exceeds this requirement, the usable storage capacity is currently only 5.9 due to pumping limitations at the Dublin tank. To make all of the storage available at Dublin, and thereby increasing the total useable storage of the system to 7.0 MG, a series of improvements would be required as noted below.
1. Increase system operation times to increase the utilization of Dublin Storage Tank. (Short-term Alternative)
2. Optimize the operation of Dublin Storage Tank by upgrading transmission main capacity to the tank and increase the firm capacity of the pumping units.
The existing Edina Water Treatment Plants have a combine capability of treating 26.5 MGD. The projected maximum day demands for the year 2040 22.25 MGD. Therefore, the existing treatment capacity is sufficient for projected demands and additional treatment capacity is not required.
C. Water Sources Complete Table 6 by listing all types of water sources that supply water to the system, including groundwater, surface water, interconnections with other water suppliers, or others. Provide the name of each source (aquifer name, river or lake name, name of interconnecting water supplier) and the Minnesota unique well number or intake ID, as appropriate. Report the year the source was installed or established and the current capacity. Provide information about the depth of all wells. Describe the status of the source (active, inactive, emergency only, retail/wholesale interconnection) and if the source facilities have a dedicated emergency power source. Add rows to the table as needed for each installation.
16
Include copies of well records and maintenance summary for each well that has occurred since your last approved plan in Appendix 1.
Table 6. Water sources and status
Resource Type (Groundwater, Surface water, Interconnection)
Resource Name
MN Unique Well # or Intake ID
Year Installed
Capacity (Gallons per Minute)
Well Depth (Feet)
Status of Normal and Emergency Operations (active, inactive, emergency only, retail/wholesale interconnection))
Does this Source have a Dedicated Emergency Power Source? (Yes or No)
Well 2 OPCJ 208399 1935 800 460 Active Yes Well 3 OPCJ 240630 1946 800 422 Active Yes Well 4 OPCJ 200561 1950 1000 500 Active Yes Well 5 OPCJ 206377 1950 1000 443 Active Yes Well 6 OPCJ 200564 1954 1000 505 Active Yes Well 7 OPCJ 206474 1955 0 547 Inactive Well 8 OPCJ 204884 1953 900 472 Active Yes Well 9 CMSH 206588 1957 1000 1130 Emergency Only Yes
Well 10 CMSH 206184 1963 1000 1001 Active Yes Well 11 CJDN 206183 1963 1000 402 Active Yes Well 12 CMSH 203614 1964 1000 1081 Active Yes
Well 13 CJDN 203613 1964 1000 496 Active Yes Well 15 OPDC 207674 1967 1000 405 Emergency Only Yes Well 16 OPDC 203101 1967 1000 382 Active Yes Well 17 CJDN 200914 1970 1000 461 Active Yes Well 18 CJDN 200918 1973 1000 446 Active Yes Well 19 CJDN 505626 1989 1000 524 Active Yes Well 20 CJDN 686286 2008 1000 467 Active Yes City of
Minneapolis Morning Side
Neighborhood N/A 1000+
gpm N/A Wholesale N/A
City of Bloomington
Pentagon Park (Customers billed by
Bloomington)
N/A 1000+ gpm
N/A Retail N/A
City of St. Louis Park
(Customers billed by St. Louis Park)
N/A N/A Retail N/A
City of Eden Prairie
(Customers billed by Eden Prairie)
N/A N/A Retail N/A
Limits on Emergency Interconnections Discuss any limitations on the use of the water sources (e.g. not to be operated simultaneously, limitations due to blending, aquifer recovery issues etc.) and the use of interconnections, including capacity limits or timing constraints (i.e. only 200 gallons per minute are available from the City of Prior Lake, and it is estimated to take 6 hours to establish the emergency connection). If there are no limitations, list none.
There are no limitations on the water sources or emergency interconnections.
D. Future Demand Projections – Key Metropolitan Council Benchmark Water Use Trends Use the data in Table 2 to describe trends in 1) population served; 2) total per capita water demand; 3) average daily demand; 4) maximum daily demand. Then explain the causes for upward or downward
17
trends. For example, over the ten years has the average daily demand trended up or down? Why is this occurring?
The City of Edina experienced a population growth from 2007-2017 increasing its population by more than 4,000 people. This trend can be attributed to redevelopment within City limits.
The City’s total per capita water demand has greatly varied from 2007-2016. The maximum and minimum per capita demands were estimated to be 159 and 112 respectively. There is no definite trend over the last 10 years, however, since 2012 the total per capita water demand has been decreasing even though the population has been increasing.
Average day demand for the City of Edina has slightly varied from 2007-2016. The maximum and minimum average day demands were estimated to be 7.61 and 5.95 respectively. There is no definite trend over the last 10 years, however, since 2012 the average day demand has been decreasing.
Maximum day demand for the City of Edina has varied from 2007-2016. The maximum and minimum maximum day demands were estimated to be 18.75 and 12.50 respectively. There is no definite trend over the last 10 years, however, since 2012 the maximum day demand has been decreasing.
Acts of water conservation and the housing market decline are considered actions that have lowered the quantity of water used over the last few years. Seasonal effects such as dry and wet weather also impact the water demands in a year. Dry and hot weather will often result in larger quantities of water used and larger maximum day demands.
Use the water use trend information discussed above to complete Table 7 with projected annual demand for the next ten years. Communities in the seven-county Twin Cities metropolitan area must also include projections for 2030 and 2040 as part of their local comprehensive planning.
Projected demand should be consistent with trends evident in the historical data in Table 2, as discussed above. Projected demand should also reflect state demographer population projections and/or other planning projections.
Table 7. Projected annual water demand
Year Projected Total Population
Projected Population Served
Projected Total Per Capita Water Demand (GPCD)
Projected Average Daily Demand (MGD)
Projected Maximum Daily Demand (MGD)
2019 51,504 51,504 156 8.03 18.02 2020 55,000 55,000 156 8.57 19.24 2021 55,500 55,500 156 8.65 19.42 2022 56,000 56,000 156 8.73 19.59 2023 56,500 56,500 156 8.81 19.77 2024 57,000 57,000 156 8.89 19.94 2025 57,500 57,500 156 8.96 20.12 2030 60,000 60,000 156 9.35 20.99 2040 63,600 63,600 156 9.92 22.25
GPCD – Gallons per Capita per Day MGD – Million Gallons per Day
Projection Method
18
Describe the method used to project water demand, including assumptions for population and business growth and how water conservation and efficiency programs affect projected water demand:
Historical water use and precipitation data indicate that 2012 was a drought year. Future projections in this report used the 2012 peaking factor and projected per capita demand as the basis for projecting future demands. The projected total population for the City of Edina was determined from the City’s updated comprehensive plan. Linear interpolation of the data was used to determine the predicted population for years not included in the comprehensive plan predictions. The projected total population for the City equals the projected population served. The projected total capita water demand established by the historical water data from 2012 was 156 gpcd. This value was used for the projected per capita demand for the calculations in Table 7. Projected average day demand was determined by multiplying the projected population served by the projected total per capita water demand. The peaking factor for the projected water demand was determined from historical data from 2012. The peaking factor was determined to be 2.24. A projected maximum day demand was established by multiplying the projected average day demand by the peaking factor.
E. Resource Sustainability
Monitoring – Key DNR Benchmark Complete Table 8 by inserting information about source water quality and quantity monitoring efforts. The list should include all production wells, observation wells, and source water intakes or reservoirs. Groundwater level data for DNR’s statewide network of observation wells are available online through the DNR’s Cooperative Groundwater Monitoring (CGM) webpage.
Table 8. Information about source water quality and quantity monitoring
MN Unique Well # or Surface Water ID
Type of monitoring point
Monitoring program Frequency of monitoring
Monitoring Method
208399 (Well 2) ☒ production well ☐ observation well ☐ source water
intake ☐ source water
reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
240630 (Well 3) ☒ production well ☐ observation well ☐ source water
intake ☐ source water
reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☐ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
200561 (Well 4) ☒ production well ☐ observation well ☐ source water
intake ☐ source water
reservoir
☐ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
19
MN Unique Well # or Surface Water ID
Type of monitoring point
Monitoring program Frequency of monitoring
Monitoring Method
206377 (Well 5) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☐ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
200564 (Well 6) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☐ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
206474 (Well 7) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
204884 (Well 8) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
206588 (Well 9) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☐ daily ☐ monthly ☐ quarterly ☒ annually
☐ SCADA ☐ grab sampling ☒ steel tape ☐ stream gauge ☐ transducer
206184 (Well 10) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
206183 (Well 11) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
203614 (Well 12) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
20
MN Unique Well # or Surface Water ID
Type of monitoring point
Monitoring program Frequency of monitoring
Monitoring Method
203613 (Well 13) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
207674 (Well 15) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
203101 (Well 16) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
200914 (Well 17) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
200918 (Well 18) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☒ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
505626 (Well 19) ☒ production well ☐ observation well ☐ source water
intake ☐ source water reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
686286 (Well 20) ☒ production well ☐ observation well ☐ source water
intake ☐ source water
reservoir
☒ routine MDH sampling
☐ routine water utility sampling
☐ other
☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually
☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge ☒ transducer
Water Level Data A water level monitoring plan that includes monitoring locations and a schedule for water level readings must be submitted as Appendix 2. If one does not already exist, it needs to be prepared and submitted with the WSP. Ideally, all production and observation wells are monitored at least monthly.
Complete Table 9 to summarize water level data for each well being monitored. Provide the name of the aquifer and a brief description of how much water levels vary over the season (the difference between the highest and lowest water levels measured during the year) and the long-term trends for each well. If
21
water levels are not measured and recorded on a routine basis, then provide the static water level when each well was constructed and the most recent water level measured during the same season the well was constructed. Also include all water level data taken during any well and pump maintenance. Add rows to the table as needed.
Groundwater hydrographs illustrate the historical record of aquifer water levels measured within a well and can indicate water level trends over time. For each well in your system, provide a hydrograph for the life of the well, or for as many years as water levels have been measured. Include the hydrographs in Appendix 3. An example of a hydrograph can be found on the DNR’s Groundwater Hydrograph webpage. Hydrographs for DNR Observation wells can be found in the CGM discussed above.
Table 9. Water level data
Unique Well Number or Well ID
Aquifer Name Seasonal Variation (Feet)
Long-term Trend in
water level data
Water level measured during well/pumping
maintenance
208399 (Well 2) Prairie Du Chien-Jordan 16 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
240630 (Well 3) Prairie Du Chien-Jordan 10 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
200561 (Well 4) Prairie Du Chien-Jordan 14 ☒ Falling ☐ Stable ☐ Rising
See Appendix 3
206377 (Well 5) Prairie Du Chien-Jordan 14 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
200564 (Well 6) Prairie Du Chien-Jordan 23 ☒ Falling ☐ Stable ☐ Rising
See Appendix 3
206474 (Well 7) Prairie Du Chien-Jordan NA ☐ Falling ☐ Stable ☐ Rising
Data not available
204884 (Well 8) Prairie Du Chien-Jordan NA ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
206588 (Well 9) Mt. Simon NA ☐ Falling ☐ Stable ☐ Rising
Data not available.
206184 (Well 10) Mt. Simon 20 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
206183 (Well 11) Jordan 11 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
203614 (Well 12) Mt. Simon
3.3 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
22
Unique Well Number or Well ID
Aquifer Name Seasonal Variation (Feet)
Long-term Trend in
water level data
Water level measured during well/pumping
maintenance
203613 (Well 13) Jordan 26 ☐ Falling ☒ Stable ☐ Rising
See Appendix 3
207674 (Well 15) Prairie Du Chien-Jordan 17 ☒ Falling ☐ Stable ☐ Rising
See Appendix 3
203101 (Well 16) Prairie Du Chien-Jordan 14 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
200914 (Well 17) Jordan
13 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
200918 (Well 18) Jordan 7 ☐ Falling ☐ Stable ☒ Rising
See Appendix 3
505626 (Well 19) Jordan 24
☒ Falling ☐ Stable ☐ Rising
See Appendix 3
686286 (Well 20) Prairie Du Chien-Jordan 25
☐ Falling ☐ Stable ☒ Rising
See Appendix 3
Potential Water Supply Issues & Natural Resource Impacts – Key DNR & Metropolitan Council Benchmark Complete Table 10 by listing the types of natural resources that are or could potentially be impacted by permitted water withdrawals in the future. You do not need to identify every single water resource in your entire community. The goal is to help you triage the most important water resources and/or the water resources that may be impacted by your water supply system – perhaps during a drought or when the population has grown significantly in ten years. This is emerging science, so do the best you can with available data. For identified resources, provide the name of specific resources that may be impacted. Identify what the greatest risks to the resource are and how the risks are being assessed. Identify any resource protection thresholds – formal or informal – that have been established to identify when actions should be taken to mitigate impacts. Provide information about the potential mitigation actions that may be taken, if a resource protection threshold is crossed. Add additional rows to the table as needed. See the glossary at the end of the template for definitions.
Some of this baseline data should have been in your earlier water supply plans or county comprehensive water plans. When filling out this table, think of what are the water supply risks, identify the resources, determine the threshold and then determine what your community will do to mitigate the impacts.
Your DNR area hydrologist is available to assist with this table.
For communities in the seven-county Twin Cities metropolitan area, the Master Water Supply Plan Appendix 1 (Water Supply Profiles), provides information about potential water supply issues and natural resource impacts for your community.
23
Steps for completing Table 10
1. Identify the potential for natural resource impacts/issues within the community First, review available information to identify resources that may be impacted by the operation of your water supply system (such as pumping). Potential Sources of Information:
• County Geologic Atlas • Local studies • Metropolitan Council System Statement (for metro communities) • Metropolitan Council Master Water Supply Plan (for metro communities)
ACTION: Check the resource type(s) that may be impacted in the column “Resource Type”
2. Identify where your water supply system is most likely to impact those resources (and vice versa). Potential Sources of Information:
• Drinking Water Supply Management Areas • Geologic Atlas - Sensitivity • If no WHPA or other information exists, consider rivers, lakes, wetlands and significant
within 1.5 miles of wells; and calcareous fens and trout streams within 5 miles of wells ACTION: Focus the rest of your work in these areas.
3. Within focus areas, identify specific features of value to the community You know your community best. What resources are important to pay attention to? It may be useful to check in with your community’s planning and zoning staff and others.
Potential Sources of Information: • Park plans • Local studies • Natural resource inventories • Tourist attractions/recreational areas/valued community resource
ACTION: Identify specific features that the community prioritizes in the “Resource Name” column (for example: North Lake, Long River, Brook Trout Stream, or Green Fen). If, based on a review of available information, no features are likely to be at risk, note “None”.
4. Identify what impact(s) the resource is at risk for Potential Sources of Information:
• Wellhead Protection Plan • Water Appropriation Permit • County Geologic Atlas • MDH or PCA reports of the area • Metropolitan Council System Statement (for metro communities) • Metropolitan Council Master Water Supply Plan (for metro communities)
24
ACTION: Check the risk type in the column “Risk”. If, based on a review of available information, no risk is identified, note “None anticipated”.
5. Describe how the risk was assessed Potential Sources of Information:
• Local studies • Monitoring data (community, WMO, DNR, etc.) • Aquifer testing • County Geologic Atlas or other hydrogeologic studies • Regional or state studies, such as DNR’s report ‘Definitions and Thresholds for Negative
Impacts to Surface Waters’ • Well boring logs
ACTION: Identify the method(s) used to identify the risk to the resource in the “Risk Assessed Through” column
6. Describe protection threshold/goals What is the goal, if any, for protecting these resources? For example, is there a lower limit on acceptable flow in a river or stream? Water quality outside of an accepted range? A lower limit on acceptable aquifer level decline at one or more monitoring wells? Withdrawals that exceed some percent of the total amount available from a source? Or a lower limit on acceptable changes to a protected habitat?
Potential Sources of Information: • County Comprehensive Water Plans • Watershed Plans or One Watershed/One Plan • Groundwater or Aquifer Plans • Metropolitan Master Plans • DNR Thresholds study • Community parks, open space, and natural resource plans
ACTION: Describe resource protection goals in the “Describe Resource Protection Threshold” column or reference an existing plan/document/webpage
7. If a goal/threshold should trigger action, describe the plan that will be implemented. Identify specific action, mitigation measures or management plan that the water supplier will implement, or refer to a partner’s plan that includes actions to be taken.
Potential Sources of Information: • County Comprehensive Water Plans • Watershed Plans or One Watershed/One Plan • Groundwater or Aquifer Plans • Metropolitan Master Plans • Studies such as DNR Thresholds study
ACTION: Describe the mitigation measure or management plan in the “Mitigation Measure or Management Plan” column.
25
8. Describe work to evaluate these risks going forward. For example, what is the plan to regularly check in to stay current on plans or new data?
Identify specific action that the water supplier will take to identify the creation of or change to goals/thresholds, or refer to a partner’s plan that includes actions to be taken.
Potential Sources of Information: • County Comprehensive Water Plans • Watershed Plans or One Watershed/One Plan • Groundwater or Aquifer Plans • Metropolitan Master Plans • Studies such as DNR Thresholds study
ACTION: Describe what will be done to evaluate risks going forward, including any changes to goals or protection thresholds in the “Describe how Changes to Goals are monitored” column.
26
Table 10. Natural resource impacts (*List specific resources in Appendix 12)
Resource Type
Resource Name
Risk Risk Assessed Through *
Describe Resource Protection Threshold or Goal *
Mitigation Measures or Management Plan
Describe How Thresholds or Goals are Monitored
☒ River or stream
Nine Mile Creek and Minnehaha Creek
☐ None anticipated ☐ Flow/water level decline ☒ Degrading water quality trends ☒ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________
☒ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer
testing ☐WRAPS or
other watershed report
☐Proximity (<1.5 miles)
☒ Metropolitan Council’s Master Water Supply Plan 2015 ☒ Local Planning Handbook Community Pages Edina
☐ Not applicable ☒ Additional data is needed to establish ☐ See report: ___________ ☐ No data available ☐ Other: ___________
☐Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☒ Other: City will address potential threats if they arise.
☐Not applicable ☐ Newly collected data will be analyzed ☒ Regular check-in with these partners: DNR, Minnehaha Creek Watershed District, and Nine Mile Creek Watershed District ☐ Other: ___________
27
Resource Type
Resource Name
Risk Risk Assessed Through *
Describe Resource Protection Threshold or Goal *
Mitigation Measures or Management Plan
Describe How Thresholds or Goals are Monitored
☒ Calcareous fen
☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________
☐ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer
testing ☐WRAPS or
other watershed Report
☐Proximity (<5 miles)
☒ Metropolitan Council’s Master Water Supply Plan 2015 ☒ Local Planning Handbook Community Pages Edina
☒ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________
☒Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________
☒Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ ☐ Other: ___________
28
Resource Type
Resource Name
Risk Risk Assessed Through *
Describe Resource Protection Threshold or Goal *
Mitigation Measures or Management Plan
Describe How Thresholds or Goals are Monitored
☒ Lake
Mirror, Arrowhead, Indianhead, Edina and Cornnelia
☐ None anticipated ☒ Flow/water level decline ☒ Degrading water quality trends ☒ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________
☒ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer
testing ☐WRAPS or
other watershed report
☐Proximity (<1.5 miles)
☐ Other: _________
☒ Metropolitan Council’s Master Water Supply Plan 2015 ☒ Local Planning Handbook Community Pages Edina
☐ Not applicable ☒ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________
☐Not applicable ☒ Change groundwater pumping ☐ Increase conservation ☒ Other: City will address potential threats if they arise.
☐Not applicable ☒ Newly collected data will be analyzed ☒ Regular check-in with these partner: DNR, Minnehaha Creek Watershed District, and Nine Mile Creek Watershed District ☐ Other: ___________
29
Resource Type
Resource Name
Risk Risk Assessed Through *
Describe Resource Protection Threshold or Goal *
Mitigation Measures or Management Plan
Describe How Thresholds or Goals are Monitored
☒ Wetland
☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________
☐ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer
testing ☐WRAPS or
other watershed report
☐Proximity (<1.5 miles)
☒ Metropolitan Council’s Master Water Supply Plan 2015 ☒ Local Planning Handbook Community Pages Edina
☒ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________
☒Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________
☒Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ____________ ☐ Other: ___________
30
Resource Type
Resource Name
Risk Risk Assessed Through *
Describe Resource Protection Threshold or Goal *
Mitigation Measures or Management Plan
Describe How Thresholds or Goals are Monitored
☒ Trout stream
☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________
☐ Geologic atlas or other mapping ☐ Modeling ☐ Monitoring ☐ Aquifer
testing ☐WRAPS or
other watershed report
☐Proximity (< 5 miles) ☒ Metropolitan Council’s Master Water Supply Plan 2015 ☒ Local Planning Handbook Community Pages Edina
☒ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________
☒Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________
☒Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ ☐ Other: ___________
☒ Aquifer
Prairie Du Chien-Jordan, Mt. Simon-Hinckley
☐ None anticipated ☒ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________
☒ Geologic atlas or other mapping ☐ Modeling ☐ Monitoring ☐ Aquifer
testing ☐Proximity
(obwell < 5 miles)
☒ Metropolitan Council’s Master Water Supply Plan 2015 ☒ Local Planning Handbook Community Pages Edina
☐ Not applicable ☒ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________
☐Not applicable ☒ Change groundwater pumping ☒ Increase conservation ☒ Other: City will address potential threats if they arise.
☐Not applicable ☒ Newly collected data will be analyzed ☒ Regular check-in with these partners MDH, DNR, Minnehaha Creek Watershed District, and Nine Mile Creek Watershed District ☐ Other: ___________
31
Wellhead Protection (WHP) and Source Water Protection (SWP) Plans Complete Table 11 to provide status information about WHP and SWP plans.
The emergency procedures in this plan are intended to comply with the contingency plan provisions required in the Minnesota Department of Health’s (MDH) Wellhead Protection (WHP) Plan and Surface Water Protection (SWP) Plan.
Table 11. Status of Wellhead Protection and Source Water Protection Plans
Plan Type Status Date Adopted Date for Update WHP ☐ In Process
☒ Completed ☐ Not Applicable
2013 2023
SWP ☐ In Process ☐ Completed ☒ Not Applicable
WHP – Wellhead Protection Plan SWP – Source Water Protection Plan
F. Capital Improvement Plan (CIP) Please note that any wells that received approval under a ten-year permit, but that were not built, are now expired and must submit a water appropriations permit.
Adequacy of Water Supply System Complete Table 12 with information about the adequacy of wells and/or intakes, storage facilities, treatment facilities, and distribution systems to sustain current and projected demands. List planned capital improvements for any system components, in chronological order. Communities in the seven-county Twin Cities metropolitan area should also include information about plans through 2040.
The assessment can be the general status by category; it is not necessary to identify every single well, storage facility, treatment facility, lift station, and mile of pipe.
Please attach your latest Capital Improvement Plan as Appendix 4.
Table 12. Adequacy of Water Supply System
System Component Planned action Anticipated Construction Year
Notes
Wells/Intakes ☐ No action planned - adequate ☒ Repair/replacement ☒ Expansion/addition
1. 2020 2. 2018 3. 2021 4. 2019 5. 2018 6. 2020 7. 2019 8. 2020 9. 2017&2019
1. Well 11 Rehab 2. Well 5 Rehab 3. Well 8 Rehab 4. Well 7 Rehab 5. Well 18 Rehab 6. Well 19 Rehab 7. Well 16 Rehab 8. Well 12 Rehab 9. Well 21 and Raw Water Line
32
System Component Planned action Anticipated Construction Year
Notes
Water Storage Facilities
☐ No action planned - adequate ☒ Repair/replacement ☐ Expansion/addition
1. 2022 1. Dublin Reservoir Pump Rehab
Water Treatment Facilities
☐ No action planned - adequate ☒ Repair/replacement ☒ Expansion/addition
1. 2018 2. 2021 3. 2019
1. Water Treatment Plant 4 Interior Painting 2. New Water Treatment Plant 5 3. Water Treatment Plant 3 Interior Painting
Distribution Systems (Pipes, valves, etc.)
☐ No action planned - adequate ☒ Repair/replacement ☐ Expansion/addition
1. 2018 2. 2021 3. 2020 4. 2018 5. 2018 6. 2019 7. 2019 8. 2020 9. 2020 10. 2019 11. 2018 12. 2020 13. 2020 14. 2021 15. 2021 16. 2021 17. 2021 18. 2019-2021
1. Bredesen Park A/E Reconstruction - Watermain Upgrade
2. Blake Road Reconstruction – Watermain Upgrade
3. West 76th Street/Edinborough Way Reconstruction – Watermain Reconstruction
4. W 62nd Street Reconstruction – Watermain Upgrade
5. Concord A/G Reconstruction – Watermain Upgrade
6. Indian Trails B/C Reconstruction – Watermain Upgrade
7. Todd Park E/G Reconstruction – Watermain Upgrade
8. Morningside D/E Reconstruction – Watermain Upgrade
9. Creek Valley C Reconstruction – Watermain Upgrade
10. Chowen Park Neighborhood Street Reconstruction– Watermain Upgrade
11. Normandale Park D Neighborhood Street Reconstruction – Watermain Upgrade
12. Interlachen Park B Reconstruction – Watermain Upgrade
13. Countryside Reconstruction – Watermain Upgrade
14. Melody Lake A Reconstruction – Watermain Upgrade
15. Grandview A Reconstruction – Watermain Upgrade
16. Countryside I Neighborhood Street Reconstruction – Watermain Upgrade
17. Hilldale Reconstruction – Watermain Upgrade 18. Watermain Rehabilitation
Pressure Zones ☐ No action planned - adequate ☐ Repair/replacement ☐ Expansion/addition
33
System Component Planned action Anticipated Construction Year
Notes
Other: ☐ No action planned - adequate ☒ Repair/replacement ☐ Expansion/addition
1. 2017-2018 2. 2018-2021 3. 2017-2021
1. SCADA PLC and Panel View Upgrades 2. Utilities Equipment Replacement 3. Asset Management Software and Equipment
Proposed Future Water Sources Complete Table 13 to identify new water source installation planned over the next ten years. Add rows to the table as needed.
Table 13. Proposed future installations/sources
Source Installation Location (approximate)
Resource Name
Proposed Pumping Capacity (gpm)
Planned Installation Year
Planned Partnerships
Groundwater NA NA NA NA NA Surface Water NA NA NA NA NA Interconnection to another supplier
NA NA NA NA NA
Water Source Alternatives - Key Metropolitan Council Benchmark Do you anticipate the need for alternative water sources in the next 10 years? Yes ☐ No ☒
For metro communities, will you need alternative water sources by the year 2040? Yes ☐ No ☒
If you answered yes for either question, then complete table 14. If no, insert NA.
Complete Table 14 by checking the box next to alternative approaches that your community is considering, including approximate locations (if known), the estimated amount of future demand that could be met through the approach, the estimated timeframe to implement the approach, potential partnerships, and the major benefits and challenges of the approach. Add rows to the table as needed.
For communities in the seven-county Twin Cities metropolitan area, these alternatives should include approaches the community is considering to meet projected 2040 water demand.
Table 14. Alternative water sources
Alternative Source Considered
Source and/or Installation Location (approximate)
Estimated Amount of Future Demand (%)
Timeframe to Implement (YYYY)
Potential Partners
Benefits Challenges
☐ Groundwater NA NA NA NA NA NA ☐ Surface Water NA NA NA NA NA NA ☐ Reclaimed stormwater NA NA NA NA NA NA ☐ Reclaimed wastewater NA NA NA NA NA NA ☐ Interconnection to
another supplier NA NA NA NA NA NA
34
PART 2. EMERGENCY PREPAREDNESS PROCEDURES The emergency preparedness procedures outlined in this plan are intended to comply with the contingency plan provisions required by MDH in the WHP and SWP. Water emergencies can occur as a result of vandalism, sabotage, accidental contamination, mechanical problems, power failings, drought, flooding, and other natural disasters. The purpose of emergency planning is to develop emergency response procedures and to identify actions needed to improve emergency preparedness. In the case of a municipality, these procedures should be in support of, and part of, an all-hazard emergency operations plan. Municipalities that already have written procedures dealing with water emergencies should review the following information and update existing procedures to address these water supply protection measures.
A. Emergency Response Plan Section 1433(b) of the Safe Drinking Water Act, (Public Law 107-188, Title IV- Drinking Water Security and Safety) requires community water suppliers serving over 3,300 people to prepare an Emergency Response Plan. MDH recommends that Emergency Response Plans are updated annually.
Do you have an Emergency Response Plan? Yes ☒ No ☐
Have you updated the Emergency Response Plan in the last year? Yes ☐ No ☒
When did you last update your Emergency Response Plan? ___________2015_________
Complete Table 15 by inserting the noted information regarding your completed Emergency Response Plan.
Table 15. Emergency Response Plan contact information
Emergency Response Plan Role Contact Person Contact Phone Number
Contact Email
Emergency Response Lead DAVE GOERGEN 952-826-0312 DGOERGEN@EDINAMN.GOV Alternate Emergency Response Lead
NATE KADERLIK 952-215-9446 NKADERLIK@EDINAMN.GOV
B. Operational Contingency Plan All utilities should have a written operational contingency plan that describes measures to be taken for water supply mainline breaks and other common system failures as well as routine maintenance.
Do you have a written operational contingency plan? Yes ☒ No ☐
At a minimum, a water supplier should prepare and maintain an emergency contact list of contractors and suppliers.
C. Emergency Response Procedures Water suppliers must meet the requirements of MN Rules 4720.5280. Accordingly, the Minnesota Department of Natural Resources (DNR) requires public water suppliers serving more than 1,000 people to submit Emergency and Conservation Plans. Water emergency and conservation plans that have been
35
approved by the DNR, under provisions of Minnesota Statute 186 and Minnesota Rules, part 6115.0770, will be considered equivalent to an approved WHP contingency plan.
Emergency Telephone List Prepare and attach a list of emergency contacts, including the MN Duty Officer (1-800-422-0798), as Appendix 5. An Emergency Contact List template is available at the MnDNR Water Supply Plans webpage.
The list should include key utility and community personnel, contacts in adjacent water suppliers, and appropriate local, state and federal emergency contacts. Please be sure to verify and update the contacts on the emergency telephone list and date it. Thereafter, update on a regular basis (once a year is recommended). In the case of a municipality, this information should be contained in a notification and warning standard operating procedure maintained by the Emergency Manager for that community. Responsibilities and services for each contact should be defined.
Current Water Sources and Service Area Quick access to concise and detailed information on water sources, water treatment, and the distribution system may be needed in an emergency. System operation and maintenance records should be maintained in secured central and back-up locations so that the records are accessible for emergency purposes. A detailed map of the system showing the treatment plants, water sources, storage facilities, supply lines, interconnections, and other information that would be useful in an emergency should also be readily available. It is critical that public water supplier representatives and emergency response personnel communicate about the response procedures and be able to easily obtain this kind of information both in electronic and hard copy formats (in case of a power outage).
Do records and maps exist? Yes ☒ No ☐
Can staff access records and maps from a central secured location in the event of an emergency?
Yes ☒ No ☐
Does the appropriate staff know where the materials are located?
Yes ☒ No ☐
Procedure for Augmenting Water Supplies Complete Tables 16 – 17 by listing all available sources of water that can be used to augment or replace existing sources in an emergency. Add rows to the tables as needed.
In the case of a municipality, this information should be contained in a notification and warning standard operating procedure maintained by the warning point for that community. Municipalities are encouraged to execute cooperative agreements for potential emergency water services and copies should be included in Appendix 6. Outstate Communities may consider using nearby high capacity wells (industry, golf course) as emergency water sources.
36
WSP should include information on any physical or chemical problems that may limit interconnections to other sources of water. Approvals from the MDH are required for interconnections or the reuse of water.
Table 16. Interconnections with other water supply systems to supply water in an emergency
Other Water Supply System Owner
Capacity (GPM & MGD)
Note Any Limitations On Use
List of services, equipment, supplies available to
respond CITY OF MINNEAPOLIS 12-INCH (1,200 GPM) NONE WOULD REQUIRE PUMPING CITY OF EDEN PRAIRIE 6-INCH (500 GPM) NONE
CITY OF BLOOMINGTON 8-INCH (750 GPM) NONE WOULD REQUIRE PUMPING ST. LOUIS PARK 6-INCH NONE
HOPKINS 8-INCH NONE GPM – Gallons per minute MGD – million gallons per day
Table 17. Utilizing surface water as an alternative source
Surface Water Source Name
Capacity (GPM)
Capacity (MGD)
Treatment Needs Note Any Limitations On Use
There are no available surface waters to be used as an alternative water source.
If not covered above, describe additional emergency measures for providing water (obtaining bottled water, or steps to obtain National Guard services, etc.)
In the event of a catastrophic event, the Minnesota Duty Officer (1.800.422.0798) could be called to request National Guard assistance for providing water.
Allocation and Demand Reduction Procedures Complete Table 18 by adding information about how decisions will be made to allocate water and reduce demand during an emergency. Provide information for each customer category, including its priority ranking, average day demand, and demand reduction potential for each customer category. Modify the customer categories as needed, and add additional lines if necessary.
Water use categories should be prioritized in a way that is consistent with Minnesota Statutes 103G.261 (#1 is highest priority) as follows:
1. Water use for human needs such as cooking, cleaning, drinking, washing and waste disposal; use for on-farm livestock watering; and use for power production that meets contingency requirements.
2. Water use involving consumption of less than 10,000 gallons per day (usually from private wells or surface water intakes)
3. Water use for agricultural irrigation and processing of agricultural products involving consumption of more than 10,000 gallons per day (usually from private high-capacity wells or surface water intakes)
4. Water use for power production above the use provided for in the contingency plan. 5. All other water use involving consumption of more than 10,000 gallons per day.
37
6. Nonessential uses – car washes, golf courses, etc.
Water used for human needs at hospitals, nursing homes and similar types of facilities should be designated as a high priority to be maintained in an emergency. Lower priority uses will need to address water used for human needs at other types of facilities such as hotels, office buildings, and manufacturing plants. The volume of water and other types of water uses at these facilities must be carefully considered. After reviewing the data, common sense should dictate local allocation priorities to protect domestic requirements over certain types of economic needs. Water use for lawn sprinkling, vehicle washing, golf courses, and recreation are legislatively considered non-essential.
Table 18. Water use priorities
Customer Category Allocation Priority
Average Daily Demand (GDP)
Short-Term Emergency Demand Reduction Potential (GPD)
Residential 1 3,830,937 3,365,428 Institutional Commercial Industrial
2
1,911,901
392,964
Irrigation - - - Wholesale - - - Non-Essential 6 286,596 135,036 TOTAL NA 6,029,436 3,893,428
GPD – Gallons per Day
Tip: Calculating Emergency Demand Reduction Potential The emergency demand reduction potential for all uses will typically equal the difference between maximum use (summer demand) and base use (winter demand). In extreme emergency situations, lower priority water uses must be restricted or eliminated to protect priority domestic water requirements. Emergency demand reduction potential should be based on average day demands for customer categories within each priority class. Use the tables in Part 3 on water conservation to help you determine strategies.
Complete Table 19 by selecting the triggers and actions during water supply disruption conditions.
38
Table 19. Emergency demand reduction conditions, triggers and actions (Select all that may apply and describe)
Emergency Triggers Short-term Actions Long-term Actions ☒ Contamination ☒ Loss of production ☒ Infrastructure failure ☒ Executive order by
Governor ☐ Other: _____________
☐ Supply augmentation through ____
☒ Adopt (if not already) and enforce a critical water deficiency ordinance to penalize lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses.
☐ Water allocation through____ ☒ Meet with large water users to
discuss their contingency plan.
☐ Supply augmentation through ____
☒ Adopt (if not already) and enforce a critical water deficiency ordinance to penalize lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses.
☐ Water allocation through____ ☒ Meet with large water users to
discuss their contingency plan.
Notification Procedures Complete Table 20 by selecting trigger for informing customers regarding conservation requests, water use restrictions, and suspensions; notification frequencies; and partners that may assist in the notification process. Add rows to the table as needed.
Table 20. Plan to inform customers regarding conservation requests, water use restrictions, and suspensions
Notification Trigger(s)
Methods (select all that apply) Update Frequency
Partners
☒ Short-term demand reduction declared (< 1 year)
☒ Website ☒ Email list serve ☒ Social media (e.g. Twitter,
Facebook) ☒ Direct customer mailing, ☒ Press release (TV, radio,
newspaper), ☐ Meeting with large water users
(> 10% of total city use) ☐ Other: ________
☐ Daily ☒ Weekly ☒ Monthly ☐ Annually
☒ Long-term Ongoing demand reduction declared
☒ Website ☒ Email list serve ☒ Social media (e.g. Twitter,
Facebook) ☒ Direct customer mailing, ☒ Press release (TV, radio,
newspaper), ☐ Meeting with large water users
(> 10% of total city use) ☐ Other: ________
☐ Daily ☒ Weekly ☒ Monthly ☐ Annually
☒ Governor’s critical water deficiency declared
☒ Website ☒ Email list serve ☒ Social media (e.g. Twitter,
Facebook)
☐ Daily ☒ Weekly ☒ Monthly ☐ Annually
39
Notification Trigger(s)
Methods (select all that apply) Update Frequency
Partners
☒ Direct customer mailing, ☒ Press release (TV, radio,
newspaper), ☐ Meeting with large water users
(> 10% of total city use) ☐ Other: ________
Enforcement Prior to a water emergency, municipal water suppliers must adopt regulations that restrict water use and outline the enforcement response plan. The enforcement response plan must outline how conditions will be monitored to know when enforcement actions are triggered, what enforcement tools will be used, who will be responsible for enforcement, and what timelines for corrective actions will be expected.
Affected operations, communications, and enforcement staff must then be trained to rapidly implement those provisions during emergency conditions.
Important Note:
Disregard of critical water deficiency orders, even though total appropriation remains less than permitted, is adequate grounds for immediate modification of a public water supply authority’s water use permit (2013 MN Statutes 103G.291)
Does the city have a critical water deficiency restriction/official control in place that includes provisions to restrict water use and enforce the restrictions? (This restriction may be an ordinance, rule, regulation, policy under a council directive, or other official control) Yes ☒ No ☐
If yes, attach the official control document to this WSP as Appendix 7.
If no, the municipality must adopt such an official control within 6 months of submitting this WSP and submit it to the DNR as an amendment to this WSP.
Irrespective of whether a critical water deficiency control is in place, does the public water supply utility, city manager, mayor, or emergency manager have standing authority to implement water restrictions? Yes ☒ No ☐
If yes, cite the regulatory authority reference: _Secs. 28-234—28-259. - Reserved.
If no, who has authority to implement water use restrictions in an emergency?
40
PART 3. WATER CONSERVATION PLAN Minnesotans have historically benefited from the state’s abundant water supplies, reducing the need for conservation. There are however, limits to the available supplies of water and increasing threats to the quality of our drinking water. Causes of water supply limitation may include: population increases, economic trends, uneven statewide availability of groundwater, climatic changes, and degraded water quality. Examples of threats to drinking water quality include: the presence of contaminant plumes from past land use activities, exceedances of water quality standards from natural and human sources, contaminants of emerging concern, and increasing pollutant trends from nonpoint sources.
There are many incentives for conserving water; conservation: • reduces the potential for pumping-induced transfer of contaminants into the deeper aquifers,
which can add treatment costs • reduces the need for capital projects to expand system capacity • reduces the likelihood of water use conflicts, like well interference, aquatic habitat loss, and
declining lake levels • conserves energy, because less energy is needed to extract, treat and distribute water (and less
energy production also conserves water since water is used to produce energy) • maintains water supplies that can then be available during times of drought
It is therefore imperative that water suppliers implement water conservation plans. The first step in water conservation is identifying opportunities for behavioral or engineering changes that could be made to reduce water use by conducting a thorough analysis of:
• Water use by customer • Extraction, treatment, distribution and irrigation system efficiencies • Industrial processing system efficiencies • Regulatory and barriers to conservation • Cultural barriers to conservation • Water reuse opportunities
Once accurate data is compiled, water suppliers can set achievable goals for reducing water use. A successful water conservation plan follows a logical sequence of events. The plan should address both conservation on the supply side (leak detection and repairs, metering), as well as on the demand side (reductions in usage). Implementation should be conducted in phases, starting with the most obvious and lowest-cost options. In some cases, one of the early steps will be reviewing regulatory constraints to water conservation, such as lawn irrigation requirements. Outside funding and grants may be available for implementation of projects. Engage water system operators and maintenance staff and customers in brainstorming opportunities to reduce water use. Ask the question: “How can I help save water?”
Progress since 2006 Is this your community’s first Water Supply Plan? Yes ☐ No ☒
Priority 1: Significant
water reduction; low
cost
Priority 2: Slight water
reduction, low costs (low
hanging fruit)
Priority 2: Significant
water reduction;
significant costs
Priority 3: Slight water
reduction, significant costs
(do only if necessary)
41
If yes, describe conservation practices that you are already implementing, such as: pricing, system improvements, education, regulation, appliance retrofitting, enforcement, etc.
If no, complete Table 21 to summarize conservation actions taken since the adoption of the 2006 water supply plan.
Table 21. Implementation of previous ten-year Conservation Plan
2006 Plan Commitments Action Taken?
Change water rates structure to provide conservation pricing ☒ Yes ☐ No
Water supply system improvements (e.g. leak repairs, valve replacements, etc.) ☒ Yes ☐ No
Educational efforts ☒ Yes ☐ No
New water conservation ordinances ☐ Yes ☒ No
Rebate or retrofitting Program (e.g. for toilet, faucets, appliances, showerheads, dish washers, washing machines, irrigation systems, rain barrels, water softeners, etc.
☒ Yes ☐ No
Enforcement
☒ Yes ☐ No
Describe other ☐ Yes ☒ No
What are the results you have seen from the actions in Table 21 and how were results measured?
Positive results from water conservation actions are indicated by the historical water use records from 2007-2016. Over the last ten years the population has been steadily increasing, however, the average daily demand has not been increasing with population growth. Water conservation efforts such as ordinances, high efficiency plumbing fixtures and education efforts can be attributed to the reduction in daily water usage.
A. Triggers for Allocation and Demand Reduction Actions Complete table 22 by checking each trigger below, as appropriate, and the actions to be taken at various levels or stages of severity. Add in additional rows to the table as needed.
42
Table 22. Short and long-term demand reduction conditions, triggers and actions
Objective Triggers Actions Protect surface water flows ☐ Low stream flow conditions
☒ Reports of declining wetland and lake levels
☐ Other: ______________
☒ Increase promotion of conservation measures
☐ Other: ____________
Short-term demand reduction (less than 1 year
☒ Extremely high seasonal water demand (more than double winter demand)
☐ Loss of treatment capacity ☒ Lack of water in storage ☒ State drought plan ☐ Well interference ☐ Other: ___________________
☒ Adopt (if not already) and enforce the critical water deficiency ordinance to restrict or prohibit lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses.
☐ Supply augmentation through ____ ☐ Water allocation through____ ☒ Meet with large water users to discuss
user’s contingency plan. Long-term demand reduction (>1 year)
☒ Per capita demand increasing
☒ Total demand increase (higher population or more industry). Water level in well(s) below elevation of _____
☐ Other: _____________
☒ Develop a critical water deficiency ordinance that is or can be quickly adopted to penalize lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses.
☐ Enact a water waste ordinance that targets overwatering (causing water to flow off the landscape into streets, parking lots, or similar), watering impervious surfaces (streets, driveways or other hardscape areas), and negligence of known leaks, breaks, or malfunctions.
☒ Meet with large water users to discuss user’s contingency plan.
☐ Enhanced monitoring and reporting: audits, meters, billing, etc.
Governor’s “Critical Water Deficiency Order” declared
☐ Describe ☐ Describe
B. Conservation Objectives and Strategies – Key benchmark for DNR This section establishes water conservation objectives and strategies for eight major areas of water use.
Objective 1: Reduce Unaccounted (Non-Revenue) Water loss to Less than 10% The Minnesota Rural Water Association, the Metropolitan Council and the Department of Natural Resources recommend that all water uses be metered. Metering can help identify high use locations and times, along with leaks within buildings that have multiple meters.
It is difficult to quantify specific unmetered water use such as that associated with firefighting and system flushing or system leaks. Typically, water suppliers subtract metered water use from total water pumped to calculate unaccounted or non-revenue water loss.
43
Is your five-year average (2010-2014) unaccounted Water Use in Table 2 higher than 10%?
Yes ☐ No ☒
What is your leak detection monitoring schedule? (e.g. Monitor 1/3rd of the city lines per year)
Full City leak detection monitoring is done on an every other year basis.
Water Audits - are designed to help quantify and track water losses associated with water distribution systems and identify areas for improved efficiency and cost recovery. The American Water Works Association (AWWA) has a recommended water audit methodology which is presented in AWWA’s M36 Manual of Water Supply Practices: Water Audits and Loss Control Programs. AWWA also provides a free spreadsheet-based water audit tool that water suppliers can use to conduct their own water audits. This free water audit tool can be found on AWWA’s Water Loss Control webpage. Another resource for water audit and water loss control information is Minnesota Rural Water Association.
What is the date of your most recent water audit? 2017
Frequency of water audits: ☐ yearly ☐ other (specify frequency) __As Needed_____ Leak detection and survey: ☐ every year ☒ every other year ☒ periodic as needed Year last leak detection survey completed: 2017
If Table 2 shows annual water losses over 10% or an increasing trend over time, describe what actions will be taken to reach the <10% loss objective and within what timeframe
Table 2 does not show water loss over 10% in the last 5 year or an increasing water loss trend.
Metering -AWWA recommends that every water supplier install meters to account for all water taken into its system, along with all water distributed from its system at each customer’s point of service. An effective metering program relies upon periodic performance testing, repair, maintenance or replacement of all meters. Drinking Water Revolving Loan Funds are available for purchase of new meters when new plants are built. AWWA also recommends that water suppliers conduct regular water audits to account for unmetered unbilled consumption, metered unbilled consumption and source water and customer metering inaccuracies. Some cities install separate meters for interior and exterior water use, but some research suggests that this may not result in water conservation.
Complete Table 23 by adding the requested information regarding the number, types, testing and maintenance of customer meters.
44
Table 23. Information about customer meters (2017)
Customer Category
Number of Customers
Number of Metered Connections
Number of Automated Meter Readers
Meter testing intervals (years)
Average age/meter replacement schedule (years
Residential 13,447 13,447 13,447 3-4 _5__ / _20__ Irrigation meters - - - - - /- Institutional - - - - - /- Commercial 451 451 451 3-4 _5__ / _20__ Industrial - - - - - /- Public facilities 60 54 - /- Other - - - - - /- TOTALS 13,140 13,134 NA NA
For unmetered systems, describe any plans to install meters or replace current meters with advanced technology meters. Provide an estimate of the cost to implement the plan and the projected water savings from implementing the plan.
There are no plans to install or replace meters with advanced technology meters.
Table 24. Water source meters
Number of Meters
Meter testing schedule (years)
Number of Automated Meter Readers
Average age/meter replacement schedule (years
Water source (wells/intakes)
18 1 Some meters are automated
__3_ / _20__
Treatment plants 5 1 ___ / ___
Objective 2: Achieve Less than 75 Residential Gallons per Capita Demand (GPCD) The 2002 average residential per capita demand in the Twin Cities Metropolitan area was 75 gallons per capita per day.
Is your average 2010-2015 residential per capita water demand in Table 2 more than 75? Yes ☒ No ☐
What was your 2010 – 2015 five-year average residential per capita water demand? 88 g/person/day
Describe the water use trend over that timeframe:
The residential per capita water demand has been variable since 2007 with a five year average of 85 gpcd. The demand has been steadily decreasing since 2012 when it reached 103 gpcd.
Complete Table 25 by checking which strategies you will use to continue reducing residential per capita demand and project a likely timeframe for completing each checked strategy (Select all that apply and add rows for additional strategies):
45
Table 25. Strategies and timeframe to reduce residential per capita demand
Strategy to reduce residential per capita demand Timeframe for completing work ☐ Revise city ordinances/codes to encourage or require water
efficient landscaping.
☐ Revise city ordinance/codes to permit water reuse options, especially for non-potable purposes like irrigation, groundwater recharge, and industrial use. Check with plumbing authority to see if internal buildings reuse is permitted
☒ Revise ordinances to limit irrigation. Describe the restricted irrigation plan:
An odd/even day restriction has been implemented. Also, water is not permitted between 11 AM and 5 PM. Both of these regulations will be continued.
☐ Revise outdoor irrigation installations codes to require high efficiency systems (e.g. those with soil moisture sensors or programmable watering areas) in new installations or system replacements.
☒ Make water system infrastructure improvements Ongoing. ☐ Offer free or reduced cost water use audits) for residential
customers.
☐ Implement a notification system to inform customers when water availability conditions change.
☐ Provide rebates or incentives for installing water efficient appliances and/or fixtures indoors (e.g., low flow toilets, high efficiency dish washers and washing machines, showerhead and faucet aerators, water softeners, etc.)
☐ Provide rebates or incentives to reduce outdoor water use (e.g., turf replacement/reduction, rain gardens, rain barrels, smart irrigation, outdoor water use meters, etc.)
☐ Identify supplemental Water Resources ☐ Conduct audience-appropriate water conservation education
and outreach.
☐ Describe other plans
Objective 3: Achieve at least 1.5% annual reduction in non-residential per capita water use (For each of the next ten years, or a 15% total reduction over ten years.) This includes commercial, institutional, industrial and agricultural water users.
Complete Table 26 by checking which strategies you will used to continue reducing non-residential customer use demand and project a likely timeframe for completing each checked strategy (add rows for additional strategies).
Where possible, substitute recycled water used in one process for reuse in another. (For example, spent rinse water can often be reused in a cooling tower.) Keep in mind the true cost of water is the amount on the water bill PLUS the expenses to heat, cool, treat, pump, and dispose of/discharge the water. Don’t just calculate the initial investment. Many conservation retrofits that appear to be prohibitively expensive are actually very cost-effective when amortized over the life of the equipment. Often reducing water use also saves electrical and other utility costs. Note: as of 2015, water reuse, and is not
46
allowed by the state plumbing code, M.R. 4715 (a variance is needed). However, several state agencies are addressing this issue.
Table 26. Strategies and timeframe to reduce institutional, commercial industrial, and agricultural and non-revenue use demand
Strategy to reduce total business, industry, agricultural demand Timeframe for completing work ☐ Conduct a facility water use audit for both indoor and outdoor
use, including system components
☐ Install enhanced meters capable of automated readings to detect spikes in consumption
☐ Compare facility water use to related industry benchmarks, if available (e.g., meat processing, dairy, fruit and vegetable, beverage, textiles, paper/pulp, metals, technology, petroleum refining etc.)
☐ Install water conservation fixtures and appliances or change processes to conserve water
☒ Repair leaking system components (e.g., pipes, valves) Ongoing. ☐ Investigate the reuse of reclaimed water (e.g., stormwater,
wastewater effluent, process wastewater, etc.)
☐ Reduce outdoor water use (e.g., turf replacement/reduction, rain gardens, rain barrels, smart irrigation, outdoor water use meters, etc.)
☐ Train employees how to conserve water ☐ Implement a notification system to inform non-residential
customers when water availability conditions change.
☐ Nonpotable rainwater catchment systems intended to supply uses such as water closets, urinals, trap primers for floor drains and floor sinks, industrial processes, water features, vehicle washing facilities, cooling tower makeup, and similar uses shall be approved by the commissioner. Plumbing code 4714.1702, Published October 31, 2016
☐ Describe other plans:
Objective 4: Achieve a Decreasing Trend in Total Per Capita Demand Include as Appendix 8 one graph showing total per capita water demand for each customer category (i.e., residential, institutional, commercial, industrial) from 2005-2014 and add the calculated/estimated linear trend for the next 10 years.
Describe the trend for each customer category; explain the reason(s) for the trends, and where trends are increasing.
The residential per capita demand has been experiencing a decreasing trend over the last five years. The five year average of the residential per capita demand was 85 gpcd.
Like the residential per capita demand, the commercial per capita demand has been experiencing a decreasing trend over the last five years. The five year average of the commercial per capita demand was 30 gpcd. The trend can be attributed to water conservation efforts as well as remarkably wet years
47
with ample rainfall, which in turn has reduced the need for lawn irrigation and other outdoor water uses, reducing overall water system demand.
Objective 5: Reduce Ratio of Maximum day (peak day) to the Average Day Demand to Less Than 2.6
Is the ratio of average 2005-2014 maximum day demand to average 2005-2014 average day demand reported in Table 2 more than 2.6? Yes ☐ No ☒
Calculate a ten-year average (2005 – 2014) of the ratio of maximum day demand to average day demand: 2.21
The position of the DNR has been that a peak day/average day ratio that is above 2.6 for in summer indicates that the water being used for irrigation by the residents in a community is too large and that efforts should be made to reduce the peak day use by the community.
It should be noted that by reducing the peak day use, communities can also reduce the amount of infrastructure that is required to meet the peak day use. This infrastructure includes new wells, new water towers which can be costly items.
Objective 6: Implement Demand Reduction Measures
Water Conservation Program Municipal water suppliers serving over 1,000 people are required to adopt demand reduction measures that include a conservation rate structure, or a uniform rate structure with a conservation program that achieves demand reduction. These measures must achieve demand reduction in ways that reduce water demand, water losses, peak water demands, and nonessential water uses. These measures must be approved before a community may request well construction approval from the Department of Health or before requesting an increase in water appropriations permit volume (Minnesota Statutes, section 103G.291, subd. 3 and 4). Rates should be adjusted on a regular basis to ensure that revenue of the system is adequate under reduced demand scenarios. If a municipal water supplier intends to use a Uniform Rate Structure, a community-wide Water Conservation Program that will achieve demand reduction must be provided.
Current Water Rates Include a copy of the actual rate structure in Appendix 9 or list current water rates including base/service fees and volume charges below.
Volume included in base rate or service charge: 0 gallons
Frequency of billing: ☐ Monthly ☐ Bimonthly ☒ Quarterly ☐ Other: _________________
Water Rate Evaluation Frequency: ☒ every year ☒ every ___ years ☐ no schedule
48
Date of last rate change: _2018_
Table 27. Rate structures for each customer category (Select all that apply and add additional rows as needed)
Customer Category
Conservation Billing Strategies in Use *
Conservation Neutral Billing Strategies in Use **
Non-Conserving Billing Strategies in Use ***
Residential ☐ Monthly billing ☒ Increasing block rates
(volume tiered rates) ☐ Seasonal rates ☒ Time of use rates ☐ Water bills reported in
gallons ☐ Individualized goal rates ☐ Excess use rates ☒ Drought surcharge ☐ Use water bill to provide
comparisons ☒ Service charge not based on
water volume ☐ Other (describe)
☐ Uniform ☒ Odd/even day watering
☐ Service charge based on water volume
☐ Declining block ☐ Flat ☐ Other (describe)
Commercial/ Industrial/ Institutional
☐ Monthly billing ☒ Increasing block rates
(volume tiered rates) ☐ Seasonal rates ☐ Time of use rates ☐ Water bills reported in
gallons ☐ Individualized goal rates ☐ Excess use rates ☒ Drought surcharge ☐ Use water bill to provide
comparisons ☒ Service charge not based on
water volume ☐ Other (describe)
☐ Uniform ☐ Service charge based on water volume
☐ Declining block ☐ Flat ☐ Other (describe)
☐ Other * Rate Structures components that may promote water conservation:
• Monthly billing: is encouraged to help people see their water usage so they can consider changing behavior.
• Increasing block rates (also known as a tiered residential rate structure): Typically, these have at least three tiers: should have at least three tiers.
o The first tier is for the winter average water use. o The second tier is the year-round average use, which is lower than typical summer use. This rate
should be set to cover the full cost of service. o The third tier should be above the average annual use and should be priced high enough to
encourage conservation, as should any higher tiers. For this to be effective, the difference in block rates should be significant.
• Seasonal rate: higher rates in summer to reduce peak demands • Time of Use rates: lower rates for off peak water use
49
• Bill water use in gallons: this allows customers to compare their use to average rates • Individualized goal rates: typically used for industry, business or other large water users to promote
water conservation if they keep within agreed upon goals. Excess Use rates: if water use goes above an agreed upon amount this higher rate is charged
• Drought surcharge: an extra fee is charged for guaranteed water use during drought • Use water bill to provide comparisons: simple graphics comparing individual use over time or compare
individual use to others. • Service charge or base fee that does not include a water volume – a base charge or fee to cover universal
city expenses that are not customer dependent and/or to provide minimal water at a lower rate (e.g., an amount less than the average residential per capita demand for the water supplier for the last 5 years)
• Emergency rates -A community may have a separate conservation rate that only goes into effect when the community or governor declares a drought emergency. These higher rates can help to protect the city budgets during times of significantly less water usage.
**Conservation Neutral**
• Uniform rate: rate per unit used is the same regardless of the volume used • Odd/even day watering –This approach reduces peak demand on a daily basis for system operation, but
it does not reduce overall water use. *** Non-Conserving ***
• Service charge or base fee with water volume: an amount of water larger than the average residential per capita demand for the water supplier for the last 5 years
• Declining block rate: the rate per unit used decreases as water use increases. • Flat rate: one fee regardless of how much water is used (usually unmetered).
Provide justification for any conservation neutral or non-conserving rate structures. If intending to adopt a conservation rate structure, include the timeframe to do so:
The City of Edina uses conservation billing strategies. Also, the City has an odd/even watering day schedule and restricts the times irrigation can occur. Time restrictions prevent watering from occurring during the hottest parts of the day when watering is least efficient.
Objective 7: Additional strategies to Reduce Water Use and Support Wellhead Protection Planning Development and redevelopment projects can provide additional water conservation opportunities, such as the actions listed below. If a Uniform Rate Structure is in place, the water supplier must provide a Water Conservation Program that includes at least two of the actions listed below. Check those actions that you intent to implement within the next 10 years.
Table 28. Additional strategies to Reduce Water Use & Support Wellhead Protection
☒ Participate in the GreenStep Cities Program, including implementation of at least one of the 20 “Best Practices” for water
☒ Prepare a master plan for smart growth (compact urban growth that avoids sprawl) ☐ Prepare a comprehensive open space plan (areas for parks, green spaces, natural areas) ☐ Adopt a water use restriction ordinance (lawn irrigation, car washing, pools, etc.) ☐ Adopt an outdoor lawn irrigation ordinance ☐ Adopt a private well ordinance (private wells in a city must comply with water restrictions) ☒ Implement a stormwater management program
50
☐ Adopt non-zoning wetlands ordinance (can further protect wetlands beyond state/federal laws-for vernal pools, buffer areas, restrictions on filling or alterations)
☐ Adopt a water offset program (primarily for new development or expansion) ☐ Implement a water conservation outreach program ☐ Hire a water conservation coordinator (part-time) ☐ Implement a rebate program for water efficient appliances, fixtures, or outdoor water
management ☐ Other
Objective 8: Tracking Success: How will you track or measure success through the next ten years? Success of conservation programs will be monitored by analyzing water use trends. Decreasing water use will indicate that the conservation programs are effective. Similarly, increasing water trends will indicate that the conservation programs are ineffective.
Tip: The process to monitor demand reduction and/or a rate structure includes: a) The DNR Hydrologist will call or visit the community the first 1-3 years after the water supply plan is
completed. b) They will discuss what activities the community is doing to conserve water and if they feel their
actions are successful. The Water Supply Plan, Part 3 tables and responses will guide the discussion. For example, they will discuss efforts to reduce unaccounted for water loss if that is a problem, or go through Tables 33, 34 and 35 to discuss new initiatives.
c) The city representative and the hydrologist will discuss total per capita water use, residential per capita water use, and business/industry use. They will note trends.
d) They will also discuss options for improvement and/or collect case studies of success stories to share with other communities. One option may be to change the rate structure, but there are many other paths to successful water conservation.
e) If appropriate, they will cooperatively develop a simple work plan for the next few years, targeting a couple areas where the city might focus efforts.
C. Regulation Complete Table 29 by selecting which regulations are used to reduce demand and improve water efficiencies. Add additional rows as needed.
Copies of adopted regulations or proposed restrictions or should be included in Appendix 10 (a list with hyperlinks is acceptable).
Table 29. Regulations for short-term reductions in demand and long-term improvements in water efficiencies
Regulations Utilized When is it applied (in effect)? ☒ Rainfall sensors required on landscape irrigation systems ☒ Ongoing
☐ Seasonal ☐ Only during declared Emergencies
☒ Water efficient plumbing fixtures required ☒ New development ☒ Replacement ☐ Rebate Programs
☒ Critical/Emergency Water Deficiency ordinance ☒ Only during declared Emergencies
51
Regulations Utilized When is it applied (in effect)? ☒ Watering restriction requirements (time of day, allowable days, etc.) ☒ Odd/even
☐ 2 days/week ☐ Only during declared Emergencies
☐ Water waste prohibited (for example, having a fine for irrigators spraying on the street)
☐ Ongoing ☐ Seasonal ☐ Only during declared Emergencies
☐ Limitations on turf areas (requiring lots to have 10% - 25% of the space in natural areas)
☐ New development ☐ Shoreland/zoning ☐ Other
☐ Soil preparation requirement s (after construction, requiring topsoil to be applied to promote good root growth)
☐ New Development ☐ Construction Projects ☐ Other
☐ Tree ratios (requiring a certain number of trees per square foot of lawn)
☐ New development ☐ Shoreland/zoning ☐ Other
☐ Permit to fill swimming pool and/or requiring pools to be covered (to prevent evaporation)
☐ Ongoing ☐ Seasonal ☐ Only during declared Emergencies
☐ Ordinances that permit stormwater irrigation, reuse of water, or other alternative water use (Note: be sure to check current plumbing codes for updates)
☐ Describe
D. Retrofitting Programs Education and incentive programs aimed at replacing inefficient plumbing fixtures and appliances can help reduce per capita water use, as well as energy costs. It is recommended that municipal water suppliers develop a long-term plan to retrofit public buildings with water efficient plumbing fixtures and appliances. Some water suppliers have developed partnerships with organizations having similar conservation goals, such as electric or gas suppliers, to develop cooperative rebate and retrofit programs.
A study by the AWWA Research Foundation (Residential End Uses of Water, 1999) found that the average indoor water use for a non-conserving home is 69.3 gallons per capita per day (gpcd). The average indoor water use in a conserving home is 45.2 gpcd and most of the decrease in water use is related to water efficient plumbing fixtures and appliances that can reduce water, sewer and energy costs. In Minnesota, certain electric and gas providers are required (Minnesota Statute 216B.241) to fund programs that will conserve energy resources and some utilities have distributed water efficient showerheads to customers to help reduce energy demands required to supply hot water.
Retrofitting Programs Complete Table 30 by checking which water uses are targeted, the outreach methods used, the measures used to identify success, and any participating partners.
52
Table 30. Retrofitting programs (Select all that apply)
Water Use Targets Outreach Methods Partners ☐ Low flush toilets, ☐ Toilet leak tablets, ☐ Low flow showerheads, ☐ Faucet aerators;
☐ Education about ☐ Free distribution of ☐ Rebate for
☐ Gas company ☐ Electric company ☐ Watershed organization
☐ Water conserving washing machines, ☐ Dish washers, ☐ Water softeners;
☐ Education about ☐ Free distribution of ☐ Rebate for
☐ Gas company ☐ Electric company ☐ Watershed organization
☐ Rain gardens, ☐ Rain barrels, ☐ Native/drought tolerant landscaping, etc.
☐ Education about ☐ Education about ☐ Free distribution of ☐ Rebate for ☐ Other
☐ Gas company ☐ Electric company ☐ Watershed organization
Briefly discuss measures of success from the above table (e.g. number of items distributed, dollar value of rebates, gallons of water conserved, etc.):
There are no retrofitting programs in place.
E. Education and Information Programs Customer education should take place in three different circumstances. First, customers should be provided information on how to conserve water and improve water use efficiencies. Second, information should be provided at appropriate times to address peak demands. Third, emergency notices and educational materials about how to reduce water use should be available for quick distribution during an emergency.
Proposed Education Programs Complete Table 31 by selecting which methods are used to provide water conservation and information, including the frequency of program components. Select all that apply and add additional lines as needed.
Table 31. Current and Proposed Education Programs
Education Methods General summary of topics
#/Year Frequency
Billing inserts or tips printed on the actual bill 4 ☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Consumer Confidence Reports Inform customers about water quality, water resource protection, and the City’s water system.
2 ☐ Ongoing ☒ Seasonal ☐ Only during declared emergencies
53
Education Methods General summary of topics
#/Year Frequency
Press releases to traditional local news outlets (e.g., newspapers, radio and TV)
4 ☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Social media distribution (e.g., emails, Facebook, Twitter)
☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Paid advertisements (e.g., billboards, print media, TV, radio, web sites, etc.)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Presentations to community groups ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Staff training ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Facility tours ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Displays and exhibits ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Marketing rebate programs (e.g., indoor fixtures & appliances and outdoor practices)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Community news letters Provided information regarding public works notices and updates, including the water system.
2 ☐ Ongoing ☒ Seasonal ☐ Only during declared emergencies
Direct mailings (water audit/retrofit kits, showerheads, brochures)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Information kiosk at utility and public buildings
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
54
Education Methods General summary of topics
#/Year Frequency
Public service announcements ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Cable TV Programs 4 ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Demonstration projects (landscaping or plumbing)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
K-12 education programs (Project Wet, Drinking Water Institute, presentations)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Community events (children’s water festivals, environmental fairs)
Public Works Open House
0.5 (Occurs once every 2
years)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Community education classes ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Water week promotions ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Website (include address: https://www.edinamn.gov/850/Protect-Our-Water )
Provides water conservation tips
☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Targeted efforts (large volume users, users with large increases)
☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Notices of ordinances ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
Emergency conservation notices As needed ☐ Ongoing ☐ Seasonal ☒ Only during declared emergencies
Other: ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies
55
Briefly discuss what future education and information activities your community is considering in the future:
The City is planning on continuing the educational and informative activities they have already implemented.
56
PART 4. ITEMS FOR METROPOLITAN AREA COMMUNITIESMinnesota Statute 473.859 requires WSPs to be completed for all local units of government in the seven-county Metropolitan Area as part of the local comprehensive planning process.
Much of the information in Parts 1-3 addresses water demand for the next 10 years. However, additional information is needed to address water demand through 2040, which will make the WSP consistent with the Metropolitan Land Use Planning Act, upon which the local comprehensive plans are based.
This Part 4 provides guidance to complete the WSP in a way that addresses plans for water supply through 2040.
A. Water Demand Projections through 2040 Complete Table 7 in Part 1D by filling in information about long-term water demand projections through 2040. Total Community Population projections should be consistent with the community’s system statement, which can be found on the Metropolitan Council’s website and which was sent to the community in September 2015.
Projected Average Day, Maximum Day, and Annual Water Demands may either be calculated using the method outlined in Appendix 2 of the 2015 Master Water Supply Plan or by a method developed by the individual water supplier.
B. Potential Water Supply Issues Complete Table 10 in Part 1E by providing information about the potential water supply issues in your community, including those that might occur due to 2040 projected water use.
The Master Water Supply Plan provides information about potential issues for your community in Appendix 1 (Water Supply Profiles). This resource may be useful in completing Table 10.
You may document results of local work done to evaluate impact of planned uses by attaching a feasibility assessment or providing a citation and link to where the plan is available electronically.
C. Proposed Alternative Approaches to Meet Extended Water Demand Projections
Complete Table 12 in Part 1F with information about potential water supply infrastructure impacts (such as replacements, expansions or additions to wells/intakes, water storage and treatment capacity, distribution systems, and emergency interconnections) of extended plans for development and redevelopment, in 10-year increments through 2040. It may be useful to refer to information in the community’s local Land Use Plan, if available.
Complete Table 14 in Part 1F by checking each approach your community is considering to meet future demand. For each approach your community is considering, provide information about the amount of
57
future water demand to be met using that approach, the timeframe to implement the approach, potential partners, and current understanding of the key benefits and challenges of the approach.
As challenges are being discussed, consider the need for: evaluation of geologic conditions (mapping, aquifer tests, modeling), identification of areas where domestic wells could be impacted, measurement and analysis of water levels & pumping rates, triggers & associated actions to protect water levels, etc.
D. Value-Added Water Supply Planning Efforts (Optional) The following information is not required to be completed as part of the local water supply plan, but completing this can help strengthen source water protection throughout the region and help Metropolitan Council and partners in the region to better support local efforts.
Source Water Protection Strategies Does a Drinking Water Supply Management Area for a neighboring public water supplier overlap your community? Yes ☒ No ☐
If you answered no, skip this section. If you answered yes, please complete Table 32 with information about new water demand or land use planning-related local controls that are being considered to provide additional protection in this area.
Table 32. Local controls and schedule to protect Drinking Water Supply Management Areas
Local Control Schedule to Implement
Potential Partners
☒ None at this time
☐ Comprehensive planning that guides development in vulnerable drinking water supply management areas
☐ Zoning overlay
☐ Other:
Technical assistance From your community’s perspective, what are the most important topics for the Metropolitan Council to address, guided by the region’s Metropolitan Area Water Supply Advisory Committee and Technical Advisory Committee, as part of its ongoing water supply planning role?
☒ Coordination of state, regional and local water supply planning roles ☒ Regional water use goals ☒ Water use reporting standards ☒ Regional and sub-regional partnership opportunities ☒ Identifying and prioritizing data gaps and input for regional and sub-regional analyses ☐ Others: ___________________________________________________________________
58
GLOSSARY Agricultural/Irrigation Water Use - Water used for crop and non-crop irrigation, livestock watering, chemigation, golf course irrigation, landscape and athletic field irrigation.
Average Daily Demand - The total water pumped during the year divided by 365 days.
Calcareous Fen - Calcareous fens are rare and distinctive wetlands dependent on a constant supply of cold groundwater. Because they are dependent on groundwater and are one of the rarest natural communities in the United States, they are a protected resource in MN. Approximately 200 have been located in Minnesota. They may not be filled, drained or otherwise degraded.
Commercial/Institutional Water Use - Water used by motels, hotels, restaurants, office buildings, commercial facilities and institutions (both civilian and military). Consider maintaining separate institutional water use records for emergency planning and allocation purposes. Water used by multi-family dwellings, apartment buildings, senior housing complexes, and mobile home parks should be reported as Residential Water Use.
Commercial/Institutional/Industrial (C/I/I) Water Sold - The sum of water delivered for commercial/institutional or industrial purposes.
Conservation Rate Structure - A rate structure that encourages conservation and may include increasing block rates, seasonal rates, time of use rates, individualized goal rates, or excess use rates. If a conservation rate is applied to multifamily dwellings, the rate structure must consider each residential unit as an individual user. A community may have a separate conservation rate that only goes into effect when the community or governor declares a drought emergency. These higher rates can help to protect the city budgets during times of significantly less water usage.
Date of Maximum Daily Demand - The date of the maximum (highest) water demand. Typically this is a day in July or August.
Declining Rate Structure - Under a declining block rate structure, a consumer pays less per additional unit of water as usage increases. This rate structure does not promote water conservation.
Distribution System - Water distribution systems consist of an interconnected series of pipes, valves, storage facilities (water tanks, water towers, reservoirs), water purification facilities, pumping stations, flushing hydrants, and components that convey drinking water and meeting fire protection needs for cities, homes, schools, hospitals, businesses, industries and other facilities.
Flat Rate Structure - Flat fee rates do not vary by customer characteristics or water usage. This rate structure does not promote water conservation.
Industrial Water Use - Water used for thermonuclear power (electric utility generation) and other industrial use such as steel, chemical and allied products, paper and allied products, mining, and petroleum refining.
Low Flow Fixtures/Appliances - Plumbing fixtures and appliances that significantly reduce the amount of water released per use are labeled “low flow”. These fixtures and appliances use just enough water to be effective, saving excess, clean drinking water that usually goes down the drain.
Maximum Daily Demand - The maximum (highest) amount of water used in one day.
Metered Residential Connections - The number of residential connections to the water system that have meters. For multifamily dwellings, report each residential unit as an individual user.
Percent Unmetered/Unaccounted For - Unaccounted for water use is the volume of water withdrawn from all sources minus the volume of water delivered. This value represents water “lost” by miscalculated water use due to inaccurate meters, water lost through leaks, or water that is used but unmetered or otherwise undocumented. Water used for public services such as hydrant flushing, ice skating rinks, and public swimming pools should be reported under the category “Water Supplier Services”.
59
Population Served - The number of people who are served by the community’s public water supply system. This includes the number of people in the community who are connected to the public water supply system, as well as people in neighboring communities who use water supplied by the community’s public water supply system. It should not include residents in the community who have private wells or get their water from neighboring water supply.
Residential Connections - The total number of residential connections to the water system. For multifamily dwellings, report each residential unit as an individual user.
Residential Per Capita Demand - The total residential water delivered during the year divided by the population served divided by 365 days.
Residential Water Use - Water used for normal household purposes such as drinking, food preparation, bathing, washing clothes and dishes, flushing toilets, and watering lawns and gardens. Should include all water delivered to single family private residences, multi-family dwellings, apartment buildings, senior housing complexes, mobile home parks, etc.
Smart Meter - Smart meters can be used by municipalities or by individual homeowners. Smart metering generally indicates the presence of one or more of the following:
• Smart irrigation water meters are controllers that look at factors such as weather, soil, slope, etc. and adjust watering time up or down based on data. Smart controllers in a typical summer will reduce water use by 30%-50%. Just changing the spray nozzle to new efficient models can reduce water use by 40%.
• Smart Meters on customer premises that measure consumption during specific time periods and communicate it to the utility, often on a daily basis.
• A communication channel that permits the utility, at a minimum, to obtain meter reads on demand, to ascertain whether water has recently been flowing through the meter and onto the premises, and to issue commands to the meter to perform specific tasks such as disconnecting or restricting water flow.
Total Connections - The number of connections to the public water supply system.
Total Per Capita Demand - The total amount of water withdrawn from all water supply sources during the year divided by the population served divided by 365 days.
Total Water Pumped - The cumulative amount of water withdrawn from all water supply sources during the year.
Total Water Delivered - The sum of residential, commercial, industrial, institutional, water supplier services, wholesale and other water delivered.
Ultimate (Full Build-Out) - Time period representing the community’s estimated total amount and location of potential development, or when the community is fully built out at the final planned density.
Unaccounted (Non-revenue) Loss - See definitions for “percent unmetered/unaccounted for loss”.
Uniform Rate Structure - A uniform rate structure charges the same price-per-unit for water usage beyond the fixed customer charge, which covers some fixed costs. The rate sends a price signal to the customer because the water bill will vary by usage. Uniform rates by class charge the same price-per-unit for all customers within a customer class (e.g. residential or non-residential). This price structure is generally considered less effective in encouraging water conservation.
Water Supplier Services - Water used for public services such as hydrant flushing, ice skating rinks, public swimming pools, city park irrigation, back-flushing at water treatment facilities, and/or other uses.
Water Used for Nonessential Purposes - Water used for lawn irrigation, golf course and park irrigation, car washes, ornamental fountains, and other non-essential uses.
Wholesale Deliveries - The amount of water delivered in bulk to other public water suppliers.
60
Acronyms and Initialisms AWWA – American Water Works Association C/I/I – Commercial/Institutional/Industrial CIP – Capital Improvement Plan GIS – Geographic Information System GPCD – Gallons per capita per day GWMA – Groundwater Management Area – North and East Metro, Straight River, Bonanza, MDH – Minnesota Department of Health MGD – Million gallons per day
MG – Million gallons MGL – Maximum Contaminant Level MnTAP – Minnesota Technical Assistance Program (University of Minnesota) MPARS – MN/DNR Permitting and Reporting System (new electronic permitting system) MRWA – Minnesota Rural Waters Association SWP – Source Water Protection WHP – Wellhead Protection
APPENDICES TO BE SUBMITTED BY THE WATER SUPPLIER
Appendix 1: Well records and maintenance summaries Go to Part 1C for information on what to include in appendix
Appendix 2: Water level monitoring plan Go to Part 1E for information on what to include in appendix
Appendix 3: Water level graphs for each water supply well Go to Part 1E for information on what to include in appendix
Appendix 4: Capital Improvement Plan Go to Part 1E for information on what to include in appendix
Appendix 5: Emergency Telephone List Go to Part 2C for information on what to include in appendix
Appendix 6: Cooperative Agreements for Emergency Services Go to Part 2C for information on what to include in appendix
Appendix 7: Municipal Critical Water Deficiency Ordinance Go to Part 2C for information on what to include in appendix
Appendix 8: Graph of Ten Years of Annual Per Capita Water Demand for Each Customer Category Go to Objective 4 in Part 3B for information on what to include in appendix
Appendix 9: Water Rate Structure Go to Objective 6 in Part 3B for information on what to include in appendix
Appendix 10: Ordinances or Regulations Related to Water Use Go to Objective 7 in Part 3B for information on what to include in appendix
Appendix 11: Implementation Checklist Provide a table that summarizes all the actions that the public water supplier is doing, or proposes to do, with estimated implementation dates.
Appendix 12: Sources of Information for Table 10 Provide links or references to the information used to complete Table 10. If the file size is reasonable, provide source information as attachments to the plan.
WELL RECORDS
No new wells have occurred since the last Water Supply Plan.
WELL 2 (Unique Well #208399)
Well 2 was drilled in April 2007.
WELL 3 (Unique Well #240630)
Well 3 was drilled in 1949.
WELL 4 (Unique Well #200561)
Well 4 was drilled in 1950.
WELL 5 (Unique Well #206377)
Well 5 was drilled in June 2002.
WELL 6 (Unique Well #200564)
Well 6 was drilled in June 1954.
WELL 7 (Unique Well #206474)
Well 7 was drilled in March 1955.
WELL 8 (Unique Well #204884)
Well 8 was drilled in 1953.
WELL 9 (Unique Well #206588)
Well 9 was drilled in September 1957.
WELL 10 (Unique Well #206184)
Well 10 was drilled in June 1963.
WELL 11 (Unique Well #206183)
Well 11 was drilled in April 1963.
WELL 12 (Unique Well #203614)
Well 12 was drilled in May 1964.
WELL 13 (Unique Well #203613)
Well 13 was drilled in May 1964.
WELL 15 (Unique Well #207674)
Well 15 was drilled in June 2002.
WELL 16 (Unique Well #203131)
Well 16 was drilled in June 1958.
WELL 17 (Unique Well #200914)
Well 17 was drilled in November 1970.
WELL 18 (Unique Well #200918)
Well 18 was drilled in October 1973.
WELL 19 (Unique Well #505626)
Well 19 was drilled in October 1989.
WELL 20 (Unique Well #686286)
Well 20 was drilled in June 2008.
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031208399
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 06/26/2018
Quad ID 104A Received Date 04/09/2007
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 2 28 24 W 18 CAABDD 448 ft. 448 ft. 04/00/2007
Elevation 878 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid Water
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Single casing
No
Above/BelowYesDrive Shoe?Joint
Well 4521 50TH ST EDINA MN 55436
Contact 5146 EDEN AV EDINA MN 55436
Geological Material From To (ft.) Color Hardness
DRIFT 0 62
PLATTEVILLE 62 63
PLATTEVILLE 63 86
PLATTEVILLE 86 91
PLATTEVILLE 91 97
ST. PETER 97 259
ST. PETER 259 262
PRAIRIE DU CHIEN 262 381
PRAIRIE DU CHEIN 381 385
JORDAN SANDSTONE 385 448
Stratigraphy Information
Casing Diameter Weight
20 53 78.6in. To ft. lbs./ft.
16 260 62.4in. To ft. lbs./ft.
12 266 49.5in. To ft. lbs./ft.
Hole Diameter
20 256in. To ft.16 448in. To ft.
Screen? MakeType266Open Hole From ft. To ft.446
Static Water Level
Pumping Level (below land surface)
LOCATED 20FT. S. OF NO. 1 GAMMA LOGGED 2-15-1984.
REDEVELOPMENT PROJECT #02-2PW
WELL RECONSTRUCTED 4-2007 BY KEYS WELL CO.
VARIANCE TN#3623.
EDINA #2 MU#208399 AMENDED RECORD
THE WELL WAS ORIGINALLY DRILLED IN 1935 AND RECONSTRUCTED IN 2007.
GAMMA & MULTI TOOL LOGGED 4-2-2015.
VIDEO 4-2-2015 BY MDH. HYDROLAB BY MDH.
Material FromAmount Toneat cement ft. 266 ft.13 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report208399
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above gradeX
GOULDS
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.80 Measureland surface 04/17/2002
ft.113 hrs.2 Pumping at 900 g.p.m.
150 feet South Direction Body of water TypeWell disinfected upon completion? X Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
01/02/2007
11005100 100 208
900140 Submersible
XYes No
Was a variance granted from the MDH for this well? X Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Drilling Co. 1347 GALVIN, M.
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Prairie Du Chien-63
Digitization (Screen) - Map (1:24,000) (15 meters orSystem X Y473111 4973204
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 08/10/1995Information from
Angled Drill Hole
April 30, 2015
CITY OF EDINA
Attn: Mr. David Goergen 7450 Metro Blvd Edina, MN 55439
(952) 292-6225cell (952) 826-0392
RE: INVOICE FOR WELL #2 MAINTENANCE INSPECTION PROJECT 2015 PO # 1292
Dear Mr. Goergen;
Bergerson-Caswell Inc. appreciates the opportunity to assist you with your well and pump needs. As requested we Removed, repaired, and reinstalled this pump installation at your well #2. We repaired the pump and stainless drop pipe. The stainless couplings were removed and installed steel coated couplings that will not gall the threads on the stainless pipe. We also sent the motor to the repair facility in Arizona. SME reconditioned and rewound this motor. Then during installation we discovered the motor requires 600 GPM to meet the motor cooling requirements and a shroud may have been the way to meet that need, but City personnel were explained these issues and said the pump will not operate below the flow rate for any time, it would rather be at 1,000 Gpm. Below I have broken down the costs to perform this project. PROJECT COST
1. Mobilize to site a well rig, with all necessary equipment to remove and Reinstall the pump installation, discharge head, 100 Hp motor, piping Level monitor, rewire and startup $3,200.00
2. Chlorinate the well to MDH standards after the pump installation $ 100.00 3. Rebuild without rewinding submersible 100 Hp motor, all shipping is included $2,350.00
*Note* Motor is recommended for rewind and thrust bearing replacement $4,550.00 4. F & I new 6"x 20' T&C Sch 40 SS drop pipe
A) Repair bad pipe section $ 600.00 5. Replacement coupling for pipe 7 each at $200/carbon steel with a phoenlic coating $1,400.00 6. Recondition Grundfos 1100S1000-3AA bowl assembly $1,805.00 7. Shop labor to clean pipe, wire, repair and reassemble pump $ 800.00 8. Misc. non-galling thread compound, gasket, 1" poly $ 625.00 9. Video investigation $1,000.00
TOTAL PROJECT INVOICE AMOUNT
$ 16,430.00
Current Well Information: Depth: 423' , SWL: 80' The last time we were in this well the bottom was 446' deep, but Keys Well Drilling re-cased with 12" &I am unaware of the final depth of the well at project completion(2005).
All Paper work and information obtained during this project has been provided to you along with this invoice. If you have any questions regarding this information, would like to discuss the project, or would to visit our facility and go over your equipment, please do not hesitate to contact us at (763)-479-3121ext #210, or my cell # (612) 369-3652. Sincerely, BERGERSO -C SWELL INC.
Tim Berquam "Project Mana
Bergerson - Caswell Inc. 5115 Industrial Street
Maple Plain, MN 55359 (763) 479-3121 Fax: (763) 479-2183
BERGERSON-CASWELL
INCORPORATED
Bergerson - Caswell Inc. 5115 Industrial Street • Maple Plain, MN 55359
Telephone: 763 - 479 - 3121 Fax: 763 - 479 - 2183 E-Mail: info@BergersonCaswell.com Equal Opportunity Employer/Contractor
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031240630
County Hennepin Entry Date 06/29/1992
Quad Minneapolis Update Date 03/10/2014
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 3 28 24 W 18 DDACDB 496 ft. 496 ft. 00/00/1949
Elevation 877 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Single casing
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55424
Geological Material From To (ft.) Color Hardness
NO RECORD 0 496
Stratigraphy Information
Casing Diameter Weight
12 265in. To ft. lbs./ft.
Screen? MakeType265Open Hole From ft. To ft.496
Static Water Level
Pumping Level (below land surface)
SUPPOSEDLY DRILLED BY LAYNE WELL CO. IN 1946. NO DRILLER'S LOG.
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report240630
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above gradeX
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.72 Measureland surface 00/00/1949
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerMinnesota Department of MDH
Remarks
indeterminate
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Prairie Du Chien-
GPS Differentially Corrected (25 meters)System X Y473882 4972728
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 08/10/1995Information from
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031200561
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 03/29/2016
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 4 28 24 W 19 BDCBBB 500 ft. 500 ft. 00/00/1950
Elevation 889 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
2 ft.Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55424
Geological Material From To (ft.) Color Hardness
DRIFT 0 80
PLATTEVILLE 80 110
ST. PETER 110 270
SHAKOPEE 270 410
JORDAN SANDSTONE 410 500
Stratigraphy Information
Casing Diameter Weight
16 270in. To ft. lbs./ft.
24 79.5in. To ft. lbs./ft.
Hole Diameter
23 187in. To ft.
Screen? MakeType270Open Hole From ft. To ft.500
Static Water Level
Pumping Level (below land surface)
G.W.Q. NO. 0202.
Material FromAmount Towell grouted, type unknown ft. ft.
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report200561
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.80 Measureland surface 00/00/1950
ft.138 hrs. Pumping at 750 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerBergerson-Caswell 27058
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Prairie Du Chien-80
GPS Differentially Corrected (25 meters)System X Y472788 4971862
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
Good Quest Recommend Replace
Customer OIC
Shaft ss rdit,
Motor (hp)/make 80D if GLS PVC Tube/Probe ,/'r
X - gitiC)S Misc Parts
Blast & Paint yes 0 no 0
CitionD gq0 -
Turbine Pump Inspection Report
Strainer yes 0
Tailpipe yes a
Bowls
Beatings Top
Int
Bo
Wear Ring Top
Int
Bo
Bowl Shaft size
no y.
no 0 Mc out at
Size
Size
Impellers open 0
Collets ss ❑
Bolts & Nuts
Col/Shaft
cfrY. Aley 651 Amount
TEE 59-1/2 T&C 19-1/4 19-1/2 T&C 9-1/2
carb 0 Dia L'I'B{ 5' flush )4 esi-za FeA ENV
Thread if)
F5/5 I VA . 10" )(1 2.1X 3/r "
!! '2 X 1irro 0 10 51 -1--
Z0 X X i‘fa MIX a"
Col Pipe Dia /0
Additional Repairs aUtAt i 4" SS - rlceues des-AuA Ft 45 "i,./V R EPA, FoA assAeA SAotAli iorike- Sio->A C.4
Shaft Couplings
Spider Beatings #
Spiders
Headshaft
Motor Headshaft
Discharge Head size
Pack Gland Bearing
a I a' I / I
02
a °la
ola aa
Well 17 Size/Model int Crti-C
OttaisiA_ Gewits
Well Depth/Measured
Job # (204, 097 Date ti -gy6 Stages 7 Pump Setting 6'C2C) S/U
/834
Depth °lig SO Fill 0
Job Name
Mfg
Well Size
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031206377
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 01/27/2018
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 5 28 24 W 29 CCCBBA 443 ft. 438 ft. 06/13/2002
Elevation 873 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid Water
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Single casing
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well 3850 69TH ST W EDINA MN 55435
Geological Material From To (ft.) Color Hardness
SAND & GRAVEL 0 37
CLAY 37 84
MUDDY SAND 84 90
SAND & GRAVEL 90 168
SAND 168 180
SAND & GRAVEL 180 185
SANDSTONE 185 190
CLAY 190 200
ST. PETER 200 237
SHAKOPEE LIMEROCK 237 365
JORDAN SANDSTONE 365 443
Stratigraphy Information
Casing Diameter Weight
24 125in. To ft. lbs./ft.
16 257in. To ft. lbs./ft.
20 200in. To ft. lbs./ft.
Hole Diameter
16 in. To ft.
Screen? MakeType257Open Hole From ft. To ft.438
Static Water Level
Pumping Level (below land surface)
G.W.Q. NO. 0203.
PROJECT #02-5PW (2002/07/09).
THE WELL WAS ORIGINALLY DRILLED IN 1950. IT WAS RECONSTRUCTED IN2002 BY 27058.
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report206377
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above gradeX
J-LINE
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.75 Measureland surface 00/00/1954
ft.89 hrs.24 Pumping at 1000 g.p.m.
feet Direction TypeWell disinfected upon completion? X Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
12 LC 100 220
1000138 Turbine
XYes No
Was a variance granted from the MDH for this well? Yes X No
Licensee Business Lic. or Reg. No. Name of DrillerBergerson-Caswell 27058 MANTHIR, D.
Remarks
St.Peter Sandstone
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Prairie Du Chien-200
GPS Differentially Corrected (25 meters)System X Y474068 4969468
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031200564
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 04/05/2017
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 6 28 24 W 19 CBACBC 505 ft. 505 ft. 06/00/1954
Elevation 903 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
2 ft.Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55424
Geological Material From To (ft.) Color Hardness
CLAY (SANDY) 0 94 YELLOW
LIMEROCK 94 110
SOAPSTONE 110 118
ST. PETER 118 278
SHAKOPEE 278 408
JORDAN 408 493
SHALE 493 505
Stratigraphy Information
Casing Diameter Weight
16 316in. To ft. lbs./ft.
24 96.5in. To ft. lbs./ft.
stainlessScreen? MakeX TypeDiameter Slot/Gauze Length Set10 in. ft.390115 505 ft.ft.
316Open Hole From ft. To ft.503
Static Water Level
Pumping Level (below land surface)
ORIGINAL DEPTH 503 FT. WITH 115 FT. OF 12 IN. GALVANIZED SCREEN,GRAVEL PACKED.RECONSTRUCTED 1976 BY KEYS TO 505 FT. WITH 115 FT. - 10 IN. STAINLESSSCREENFROM 390 TO 505 FT., GRAVEL PACKED.
OPEN HOLE FROM 316 TO 370 FT. THE TOP OF THE LEADER PIPE.
Material FromAmount Towell grouted, type unknown ft.0 316 ft.31 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report200564
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
PEERLESS
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.90 Measureland surface 06/00/1954
ft.165 hrs. Pumping at 1956 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
100 220
1000 Turbine
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Prairie Du Chien-94
GPS Differentially Corrected (25 meters)System X Y472600 4971537
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
ell 1 1 1 1
1 1
1 1
1 1 1
1 1 1 1 23 23
1 24 24 1 1
24 24 24 24 23 23 1 1 24 24
24 1
1 1
6 6 1
6 6 6 6
1 1 6 6
1 1
480 2 2 2
I
I
U
U
N
I
I
I
I
E.H. Renner & Sons Incorporated WELL DRILLING FOR FIVE GENERATIONS
15688 Jarvis Street NW ^ Elk River, Minnesota 55330
Phone (763) 427-6100 * Fax (763) 427-0533 * Toll Free (800)- 409-WELL
Upper Bearing Serial No.
Head Nut Motor Shaft Motor Shaft Coupling Head Shaft Head Shaft Coupl Pump Head Manufacture Centerline of discharge Top Column and Head Flange Gasket Sub Base In.Well OD Pump Packing Size Packing Box Bush Top Column Pipe Int. Column Pipe Bot. Column Pipe Column Couplings Suction Pipe Bear. Retainers Rubber Bearings Int. Shaft Bot. Shaft Shaft Coupl Sleeve Bowl Assembly Mfg.
GPM In. Stickup
Serial No. Bowl Shaft Disch. Brg. Seris Brg. Suction Brg Collets Impellers Wear Rings Disch.Case Serie Case Suct. Case Bowl Bolts Strainer Pipe _1_ Shureline T&C Coupling 1" PVC Sch 80 PVC Cap 1" Sch 80 FIP PVC 1" Plug FIP
Owner:
City of Edina
Contact:
Dave Goergen
Phone:
952-826-0312
Mobile:
952-292-6225 240 Ft. Setting
10 In Diam. 1 11/16 In. Shaft
New Reuse Pulled
Motor x Inspect x Repair
Motor Mfg US Hp Motor RPM
Type RUST In. CD In. BX
FL Amps 229 Volts 460 Phase 7322-BEM Lower Bearing 6215-J
612-6F80A-M In. I.D. In. Height
1 11/16 In. O.D. In. Lgth. 1 11/16 In. I.D. In. Lgth. 1 11/16 In. O.D. 62.5 In. Lgth. 1 11/16 In. I.D. In. Lgth.
X Sandblast X Paint In. Height
In. Cente to face of flange In. Lgth. Model
10 In. Diam. Type In. Sub base ID
In. Inches lenght In. I.D. In. O.D.
10 In. Diam. 59.25 In. Lgth. 10 In. Diam. 119.25 In. Lgth. 10 In. Diam. 59.25 In. Lgth.
Date
1/5/2018
Well #
6
Job #
3105
12 In. Stickup
Replace 1800 Model BF80A
In. BD 3
Cat No. Location
8 TPI - Mat. Keyway .416SS
8 TPI - Mat. .4165S 8 TPI - Mat. .416SS 8 TPI - Mat 416SS
In.Thrd Depth In.
Material Steel
Material Graphite In. Lgth.
0.365 Sch Mat Steel
0.365 Sch Mat Steel
0.365 Sch Mat Steel
Material Steel
In. O.D. In. I.D. In. I.D. In. I.D. Fit In Diameter In. I.D. Soft Soft Soft
In. I.D. In. O.D.
In. O.D. In. O.D. In. O.D. Worn Worn In. O.D. Worn Worn Worn
116.25 In. Lgth. 0.365 Sch Mat Steel 3/4 In. Ring Tickness Material
In. O.D. In. Lgth. Rubber 120 In. Lgth. 8 TPI - Mat. .416 SS 60 In. Lgth. 8 TPI - Mat. .416 SS In. Lgth. 8 TPI - Mat. .416 SS
In. O.D. Stages 6 1800 RPM TPI
8 Suction Imp Diam Imp Mat.
In. Lgth. 8 TPI - Mat. .416 SS In. Lgth. In. Lgth. In. Lgth.
Material .416 SS Material
In. Lgth. None Material CI Material CI Material CI Material .416 SS
In. Lgth.
In. Lgth. Bowl Mat.
Effc. 83%
STRAIGHT Style 10 In. Diam. 10 In. Diam.
In. I.D. 1 11/16 In. O.D. 1 11/16 In. O.D. 1 11/16 In. I.D.
In. I.D. Model
1000 Ft. Head 12 Line Shaft 10 Discharge
1 11/16
I
Other
Televise Well ?
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031206474
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 09/22/2015
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 7 117 21 W 28 CCDDBA 547 ft. 547 ft. 03/00/1955
Elevation 951 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
C/W EDINA MN
Geological Material From To (ft.) Color Hardness
CLAY 0 18
SAND & GRAVEL 18 35
CLAY 35 78
SAND 78 132
LIMEROCK 132 159
SOAPSTONE 159 162
SANDROCK 162 290
SANDROCK & SHALE 290 324
SHAKOPEE 324 453
JORDAN 453 459
JORDAN 459 545
SHALE 545 547
Stratigraphy Information
Casing Diameter Weight
16 350in. To ft. lbs./ft.
24 148in. To ft. lbs./ft.
Screen? MakeType350Open Hole From ft. To ft.547
Static Water Level
Pumping Level (below land surface)
GAMMA LOGGED 11-8-04 BY JIM TRAEN
Material FromAmount Toneat cement ft. ft.463 Sacks
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report206474
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.112 Measureland surface 03/00/1955
ft.137 hrs. Pumping at 1040 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Prairie Du Chien-132
GPS Differentially Corrected (25 meters)System X Y471863 4972656
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 03/22/1993Information from
Angled Drill Hole
952-292-6912 10 In Diam. 1,6
15 7 1
23 1
23 23 22 1 23 23 1
E.H. Renner & Sons WELL DRILLING FOR FIVE GENERATIONS 15688 Janes Street NW * Elk River, Minnesota 55330
Phone (763) 427-6100 * Fax (763) 427-0533 * Toll Free (800) - 409-WELL
Incorporated
Owner: City of Edina - Public Works Department Contact: Dave Goergen Pete Phone: 952-826-0312 Mobile: 952-292-6225
230 Ft. Setting New Reuse
0 4/13/2012
Steve
Well # 7 Job # 4995
952-292-6910 In. Shaft 12 & 8 In. Stickup
1 Motor
New
RUST 114
Inspect Repair Replace Hp 100 RPM 1770 Model
In. CD 36.9375 In. BX 1.6875 In. BD 16.5 Volts 460 Phase 3
Motor Mfg Type
FL Amps Upper Bearing
Serial No.
Cat Na Location
Head Nut In. I.D. In. Height Motor Shaft In. O.D. In. Lgth. Motor Shaft Coupling In. I.D. In. Lgth. Head Shaft In. O.D. In. Lgth. Head Shaft Coup! In. I.D. In. Lgth. Pump Head Yes Sandblast Yes Paint Manufacture Layne 20 In. Height Centerline of discharge 8,125 In. Cente to face of flange 18.25 Top Column and Head In. Lgth. Model TF1025 Sub Base In.Well OD In. Sub base ID Pump Packing Size In. Inches lenght Packing Box Bush 1.6875 In. I.D. In. O.D. Top Column Pipe 10 In. Diam. 59.25 In. Lgth. Top Column Pipe 10 In. Diam. 59.25 In. Lgth. 40
Sch Mat Steel Int. Column Pipe - Pole Barn Bot. Column Pipe 10 In. Diam. 59.25 In. Lgth. Sch Mat Column Couplings J Style Material Steel Suction Pipe 10 In. Diam. 120 In. Lgth. 40 Sch Mat Steel Bear. Retainers 10 In. Diam. 0.75 In. Ring Tickness Material Bronze Rubber Bearings 1.875 In. I.D. 2.5 In. O.D. 3.625 In. Lgth. Rubber Int. Shaft 1.6875 In. O.D. 120 In. Lgth. TPI - Mat. .416 SS Bot. Shaft 1_6875 In. O.D. 64 In. Lgth. 173 TPI - Mat .416 SS Shaft Coupl 1.6875 In. I.D. 4 In. Lgth. 10 TPI - Mat. .416 SS Sleeve 1.6875 In. I.D. 1.875 In. O.D. 7 In. Lgth. 416 SS Bowl Assembly Mfg. Gould Model 12 MC Stages 5 Bowl Mat. C
GPM 1000 Ft. Head 330 RPM 1770 Effc. 83% In. Stickup 8 Line Shaft 1.6875 TPI 10
I0 Discharge 10 Suction Serial No. 502467 8.5 Imp Diam Closed Imp - Mat. Bronze
Pipe 1" Sch 80 T&C Coupling 1" PVC Sch 80 PVC Cap 1" Sch 80 FIP PVC 1" Plug FIP
1 1 1 1 1
230 12
TPI - Mat. Keyway TPI - Mat. TPI - Mat. TPI - Mat.
I n. Th rd Depth In.
Material Steel Material Graphite
In. Lgth. Bronze Sch Mat Steel
Special Top Column 10" x 59.25 TBE (Long Thread on Int. Column Pipe 10 In. Diam. 11925
Sch Mat one end & standard threads on other)
In. Lgth.
• er Pick Up Discharge Head Sandblast and Paint Complete
Phone (Yea) 427,6100 * Fax (783)427-0532 Twill Rrae 1 f300) 40944ELL
5292018
Weft # 7
Job # 4995
Owner City of Edina - Public Works Department
contact Dave Goergen Rime: 952-826-0312 Mebite: 952-292-6225
Pete
952-292-6912
Steve
952-292-6910
230 Ft. Setting 10 In Diem. 1.6875 In. Shaft 12 & 8 In. Stickup
Reuse x Inspect. x Repair Replace I Motor
Motor Mfg US Hp 100 RPM 1770 Model Type RUSI In. CD 36.9375 In. BX 1.6875 In. BD 16.5
FL Amps 114 Volts 460 Phase 3 Upper Bearing Cat No.
Serial No. Location In.. I.D. fn. Height TR - Mat Head Nut
Motor Shaft In. O.D. In. Lgth. Keyway Motor Shaft Coupling In. I.D. fn. Lgth.. TN -Mat.
1 Head Shaft. fn. O.D. In. Lgth. TEl -Mat Head Shaft Coup( In. LD. In. Lgth. TH - Mat
1 Pump Head Yes Sandblast. Yes Paint Manufacture Layne 20 fn. Height In.Thrd Depth Centerline of discharge 8.125 fn. Cente to face of flange 18.25 in. Top Column and Head In. Lgth. Model TF1025 Sub Base In_VVell OD, En. Sub base ED Material Steel Pump Packing Size In. Inches lenght Material Graphite Packing Box Bush 1.6875 In I.D. fn. O.D. fn. Lgth. Bronze Top Column Pipe 10 fn. Din 59.25 In. Lgth. Sch Mat Steel
New
1
Int. Column Pipe Bot Column Pipe Column Couplings Suction Pipe
10 10 J
10 23 Bear. Retainers 10
Rubber Bearings 1.875 22 Int Shaft 1.6875
Bot Shaft 1.6875 22 Shaft Coup!. 1.6875 23 Sleeve 1.6875
Bowl Assembly Mfg_ Gould
Special Top Column 10" x 59.25 TBE (Long Thread on one end & standard threads on other) In. Diam. 119.25 In_ Lgth Sch. Mat Steel fn. Diam. 59.25 fn. Lgth. Sch Mat Steel Style Material Steel In. Diem. 120 In. Lgth. 40 Sch Mat Steel fn. Diam.. 0.75 fn. Ring Tickness Material Bronze In. LD. 2.5 In, 0.D. 3.625 fn. Lgth. Rubber fn. O.D. 120 In. Lgth. 10 TN - Mat .416 SS fn. O.D. 64 fn. Lgth. 10 TPI - Mat. .416 SS in. L0. 4 In, Lgth. 10 WI - Mat 416 SS In. ED. 1.875 fn. O.D. 7 fn. Lgth. .416 SS
Model 12CMC Stages 5 Bowl Mat CI
I .22
23
23
fn. Stickup 10
Serial No_ 602467
8 Line Shaft 1.6875 TPI 10 Discharge 10 Suction
8.5 Imp Diam Closed Imp-Mat Bronze
EH. Renner & Sons ]ncorporated
WELL DRILLING,FOR FIVEGENERATJONS
/56E38 Jarvis Street)VW 'Elk'River, MincleSata 55330
GPM 1000 Ft Head 330 RPM 1770 Eft 83%
230 0
Pipe 1" Sch 80 T&C Coupling 1" PVC Sch 80 PVC Cap 1" Sch 80 HP PVC Plug FIP
Other Pick Up Discharge Head Sandblast and Paint
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031204884
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 10/05/2015
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 8 116 21 W 5 DAAABD 472 ft. 472 ft. 00/00/1953
Elevation 872 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55439
Geological Material From To (ft.) Color Hardness
CLAY 0 18
CLAY, SAND AND 18 40
HARD SAND AND 40 60
SANDY CLAY AND 60 100
MUDDY SAND, 100 157
SAND AND GRAVEL 157 173
CLAY 173 191 HARDGRAY
CLAY, GRAVEL AND 191 218
HARD BLUE AND GRAY 218 220
SHAKOPEE LIMEROCK 220 361
SHALE AND LIMEROCK 361 364
JORDAN SANDROCK 364 445
SHALE ST. LAWRENCE 445 472 BLUE
Stratigraphy Information
Casing Diameter Weight
16 232in. To ft. lbs./ft.
24 219in. To ft. lbs./ft.
Screen? MakeType232Open Hole From ft. To ft.472
Static Water Level
Pumping Level (below land surface)
ANNULAR SPACE AROUND 16" CASING FILLED WITH CEMENT GROUT TO TOP.
Material FromAmount Toneat cement ft. 232 ft.
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report204884
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.49 Measureland surface 00/00/1953
ft.82 hrs. Pumping at 1200 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerBergerson-Caswell 27058
Remarks
St.Peter Sandstone
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Prairie Du Chien-218
Digitization (Screen) - Map (1:12,000) (>15 meters)System X Y471630 4970067
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995Info/GPS from data
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031206588
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 09/07/2018
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 9 117 21 W 32 DADAAC 1130 ft. 1130 ft. 09/30/1957
Elevation 929 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Telescoping
No
Above/BelowYesDrive Shoe?Joint
C/W EDINA MN
Geological Material From To (ft.) Color Hardness
CLAY & STONES 0 16
GRAVEL & ROCKS 16 28
SANDY CLAY 28 63
CLAY 63 83 BROWN
SANDY CLAY 83 98 GRAY
CLAY, GRAVEL & 98 119
LIMEROCK 119 129
SOAPSTONE 129 133
ST. PETER SANDROCK 133 297
SHAKOPEE LIMEROCK 297 431
JORDAN SANDROCK 431 513
ST. LAWRENCE SHALE 513 523
SHALE & LIMEROCK 523 698
SANDROCK & SHALE 698 778
SHALE 778 863
SHALE W/SANDROCK 863 993
HINCKLEY SANDROCK 993 1123 PINK
SHALE 1123 1130
Stratigraphy Information
Casing Diameter Weight
24 124in. To ft. lbs./ft.
16 563in. To ft. lbs./ft.
10 101in. To ft. lbs./ft.
Screen? MakeType1010Open Hole From ft. To ft.1130
Static Water Level
Pumping Level (below land surface)
COMBINATION TELESCOPING AND STEP DOWN. G.W.Q. NO.0062
DNR OBWELL 27015.
Material FromAmount Toneat cement ft.533 1010 ft.497 Sacksneat cement ft. ft.68.4 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report206588
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.215 Measureland surface 10/00/1957
ft.288 hrs. Pumping at 754 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012 JOHNSON, R.
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Mid.Prot. sed. undividedMinnesota Department of Health
Mt.Simon119
GPS Differentially Corrected (25 meters)System X Y471483 4971517
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031206588
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 09/07/2018
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 9 117 21 W 32 DADAAC 1130 ft. 1130 ft. 09/30/1957
Elevation 929 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Telescoping
No
Above/BelowYesDrive Shoe?Joint
C/W EDINA MN
Geological Material From To (ft.) Color Hardness
CLAY & STONES 0 16
GRAVEL & ROCKS 16 28
SANDY CLAY 28 63
CLAY 63 83 BROWN
SANDY CLAY 83 98 GRAY
CLAY, GRAVEL & 98 119
LIMEROCK 119 129
SOAPSTONE 129 133
ST. PETER SANDROCK 133 297
SHAKOPEE LIMEROCK 297 431
JORDAN SANDROCK 431 513
ST. LAWRENCE SHALE 513 523
SHALE & LIMEROCK 523 698
SANDROCK & SHALE 698 778
SHALE 778 863
SHALE W/SANDROCK 863 993
HINCKLEY SANDROCK 993 1123 PINK
SHALE 1123 1130
Stratigraphy Information
Casing Diameter Weight
24 124in. To ft. lbs./ft.
16 563in. To ft. lbs./ft.
10 101in. To ft. lbs./ft.
Screen? MakeType1010Open Hole From ft. To ft.1130
Static Water Level
Pumping Level (below land surface)
COMBINATION TELESCOPING AND STEP DOWN. G.W.Q. NO.0062
DNR OBWELL 27015.
Material FromAmount Toneat cement ft.533 1010 ft.497 Sacksneat cement ft. ft.68.4 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report206588
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.215 Measureland surface 10/00/1957
ft.288 hrs. Pumping at 754 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012 JOHNSON, R.
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Mid.Prot. sed. undividedMinnesota Department of Health
Mt.Simon119
GPS Differentially Corrected (25 meters)System X Y471483 4971517
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
E.H. Renner & Sons IncorporaLed WELL DRILLING FOR FIVE GENERATIONS
15688 Jarvis Street NW * Elk River, Minnesota 55330
Phone (763) 427-6100 • Fax (763) 427-0533 * Toll Free (800)- 409-WELL
Owner: Contact:
Phone:
Mobile:
Pulled
New Reuse
City of
330
Dave Goergen 952-826-0312
Edina
Ft. Setting
Motor Motor Mfg
Type FL Amps
Serial No. Motor Shaft Motor Shaft Coupling Pump Head Manufacture
10
Date Well # Job #
In Diam. 1.6875 In. Shaft 12
December 21, 2015 10
1989
In. Stickup
Replace 5-clL.H.1
New Inspect x Repair x 1 US Hp 200 RPM 1770 Model
RUSI In. CD In. BX 1.6875 In. BD 16.5 Volts 480 Phase 3
131258 Location
1 1.938 In. O.D. 56 In. Lgth. 0.5 Keyway .416 SS Step - 1-11/16" 8TPI x 1-15/16 8TPI
X Sandblast X .416 SS
1 Paint In.Thrd Depth Layne 18 In, Height
Pulled 330 Centerline of discharge 8 In. Cente to face of flange 14 In. CI Top Column and Head 77.75 In. Lgth. Model Pump Packing Size 0.375 In. 30 Inches lenght Graphite
1 Packing Box Bush 1.9375 In. I.D. In. O.D. In. Lgth. Bronze
1 Top Column Pipe 10 In. Diam. 59.25 In. Lgth. 40 Sch Steel Long Thread
20 12 Int. Column Pipe 10 In. Diam. 119.25 In. Lgth. 40 Sch Steel Bot. Column Pipe 10 In. Diam. 59.25 In. Lgth. 40 Sch Steel
21 12 Column Couplings J Style Steel
1 Suction Pipe 10 In. Diam. 120 In. Lgth. 40 Sch Steel
1 K & K Surge Valve 10 In. I.D. In. Lgth. Steel
1 Head Shaft 1.9375 In. O.D. 61.25 In. Lgth. 8 TPI - Mat. .416 SS
32 Int. Shaft 1.6875 In. O.D. 120 In. Lgth. 8 TPI - Mat. .416 SS
1 Bot Shaft 1.6875 In. O.D. 60 In. Lgth. 8 TPI - Mat .416 SS
33 Shaft Coupl 1.6875 In. I.D. In. Lgth. 8 TPI - Mat .416 SS 33 Sleeve 1.6875 In. I.D. 1.9375 In. O.D. 7 In. Lgth.
1 32 Bear. Retainers 10 In. Diam. 0.75 In. Ring Tickness 33 Rubber Bearings 1.9375 In. I.D. 3 In. O.D. 4.5 In. Lgth.
Replace Bowls Mfg. Gould Model 12CMC Stages 9 1000 GPM 600 Head 1770 RPM TPI 8 TPI
12 Stickup Bronze Imp Mat. CI Bowl Mat. Serial No. 527323
Bowl Shaft TPI - Mat .416 SS 1 In. O.D. In. Lgth. Disch. Brg. In. I.D. In. O.D. In. Lgth. Bronze
9 Seris Brg. In. I.D. In. O.D. In. Lgth. Bronze
Suction Brg In. I.D. In. O.D. In. Lgth. Bronze
9 Collets Fit Worn Material .416 SS
0 9 Impellers In Diameter Worn Material Bronze
Wear Rings In. I.D. In. O.D. In. Lgth. Bronze
1 Disch.Case Soft Worn Material CI
9 Serie Case Soft Worn Material CI
1 Suct. Case Soft Worn Material CI
Date 05/20/19 Well # 10 Job # 1989
12 In. Stickup
Repair x
Replace RPM 1770 Model
In. BX 1.6875 In. BD
16.5 Phase 3
Location In. Lgth. 0.5 Keyway
TPI X Paint
.416 SS
.416 SS
In.Thrd Depth In. CI
Graphite In. Lgth. Bronze Sch
Steel
Sch
Steel Sch
Steel Steel
Sch In. Lgth. TPI - Mat. TPI - Mat. TPI - Mat TPI - Mat. In. Lgth.
Steel Steel
.416 SS
.416 SS
.416 SS
.416 SS
E.H. Renner & Sons Incorporated
WELL DRILLING FOR FIVE GENERATIONS
15688 Jarvis Street NW * Elk River, Minnesota 55330
Phone (763) 427-6100 * Fax (763) 427-0533 * Toll Free (800) - 409-WELL
10 In Diam. 1.6875 In. Shaft
New Inspect x Motor Mfg US Hp 200
Type RUSI In. CD FL Amps Volts 480
Serial No. 131258
Owner: City of Edina Contact: 0
Phone: Dave Goergen Mobile:
Pulled 330 Ft. Setting New Reuse
1
Motor
1
1
Pulled 330
1 1
12 20 32 1
12 21 1 1 1 32 1
33 33 33 33
33 33 1
Motor Shaft Motor Shaft Coupling Pump Head Manufacture Centerline of discharge Top Column and Head Pump Packing Size Packing Box Bush Top Column Pipe Long Thread Int. Column Pipe Bot. Column Pipe Column Couplings Suction Pipe K & K Surge Valve Head Shaft Int. Shaft Bot. Shaft Shaft Coupl Sleeve Bear. Retainers Rubber Bearings Replace Bowls
1.938 Step - 1-1
X Layne
In. O.D. 56 1/16" 8TPI x 1-15/16 8 Sandblast
18 In. Height of flange 14
Model Inches lenght In. O.D. In. Lgth. 40
In. Lgth. 40 In. Lgth. 40
In. Lgth. 40
In. Lgth. 8 In. Lgth. 8 In. Lgth. 8 In. Lgth. 8 In. O.D. 7
8 In. Cente to face 77.75 In. Lgth. 0.375 In. _ 30 1.9375 In. I.D.
10 In. Diam. 59.25
10 In. Diam. 119.25
10 In. Diam. 59.25
J Style
10 In. Diam. 120
10 In. I.D. 1.9375 In. O.D. 61.25 1.6875 In. O.D. 120 1.6875 In. O.D. 60 1.6875 In. I.D. 1.6875 In. I.D. 1.9375
10 In. Diam. 0.75 1.9375 In. I.D. 3
Mfg. Gould 1000 GPM 600
12 Stickup Bronze
In. Ring Tickness In. O.D. 4.5 In. Lgth Model 12CMC
Stages 9 Head 1770 RPM TPI
8 TPI
Imp Mat. CI Bowl Mat. Serial No. 527323
Bowl Shaft Disch. Brg. Serfs Brg. Suction Brg Collets Impellers Wear Rings Disch.Case Serie Case Suct. Case
In. O.D. In. I.D. In. I.D. In. I.D. Fit In Diameter In. I.D. Soft Soft Soft
In. Lgth. In. O.D. In. O. D. In. O.D. Worn Worn In. O.D. Worn Worn Worn
TPI - Mat. .416 SS In. Lgth. Bronze In. Lgth. Bronze In. Lgth. Bronze
Material .416 SS Material Bronze
In. Lgth. Bronze Material CI Material CI Material CI
1
9
9 9
9
1 9 1
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031206183
County Hennepin Entry Date 08/24/1991
Quad Bloomingto Update Date 01/07/2016
Quad ID 104D Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 11 28 24 W 31 DCBBBB 403 ft. 403 ft. 04/16/1963
Elevation 840 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55424
Geological Material From To (ft.) Color Hardness
SAND AND GRAVEL 0 36
BLUE CLAY AND 36 45
SANDY BLUE CLAY 45 75
CLAY, SAND, GRAVEL 75 173 BROWN
COARSE GRAVEL AND 173 179
SHAKOPEE-ONEOTA 179 304
JORDAN SANDROCK 304 327 M.HARD
JORDAN SANDROCK 327 350 M.HARD
JORDAN SANDROCK 350 362 V.HARD
JORDAN SANDROCK 362 384 M.HARD
JORDAN SANDROCK 384 402 HARD
ST. LAWRENCE SHALE 402 403
Stratigraphy Information
Casing Diameter Weight
16 321in. To ft. lbs./ft.
24 182in. To ft. lbs./ft.
Hole Diameter
24 403in. To ft.
Screen? MakeType321Open Hole From ft. To ft.403
Static Water Level
Pumping Level (below land surface)
M.G.S. NO. 285.
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report206183
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.22 Measureland surface 04/16/1963
ft.60 hrs. Pumping at 1800 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerBergerson-Caswell 27058
Remarks
Prairie Du Chien Group
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Jordan179
Digitization (Screen) - Map (1:12,000) (>15 meters)System X Y473187 4968046
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 03/22/1993Info/GPS from data
Angled Drill Hole
WELL DRILLING FOR FIVE GENERATIONS
15688 Jams Street NW 'Elk Rivet, iMinnesota 55330
Phone (763) 427-6100 Fax (763) 427-0533 " Toll Ffee ,(800)- 409-WELL
d
H. Renner & Sons
Ne
1
10
11
Owner. City of Edina 7/12/2017
Contact Dave Goergen Well # 11
Phone: 952-826-0312 Job # 1270
Mobile: 952-292-6225 110 Ft. Setting 10 In Diam. 1.5 In. Shaft 12 In. Stickup
Motor X Inspect Repair Replace
Motor Mfg US Hp 125 RPM 1780 Model M-88
Type RUSI In. CD In. BX 1.5 In. BD 16.5
FL Amps 142 Volts 460 Phase 3
Serial No. F 05-M88-M84 Location.
1 Head Nut In. I.D. fn. Height TPI - Mat.
Motor Shaft 1.5 In. O.D. In. Lgth_ Keyway
Motor Shaft Coupling They Sent 62-3/8 10
Head Shaft 1.5 In, O.D. 64-3/8 fn. Lgth. 8 TPI - Mat. 0.416
Head Shaft Coupl 1.5 In. I.D. In. Lgth. 8 TPI - Mat 0.416
Pump Head X Sandblast X Paint
Manufacture Layne 18.5 In.. Height In.Thrd Depth
Centerline of discharge 7.5 In. Cente to face of flange 14 In.
Top Column and Head 79.75 In. Lgth. Model
Flange Gasket In. Diem. Type
Sub Base In.Well OD In. Sub base ID Material Steel
Pump Packing Size 0.375 In. 30 Inches fenght Material Graphite
Packing Box Bush 1.5 In. I.D. In. O.D. In. Lgth. Bronze
Top Column Long thread 10 In. Diam. 57 In. Lgth. 40 Sch Steel
Int. Column Pipe 10 In. Diam. 119.25 in, Lgth. 40 Sch Steel
Bot. Column Pipe 10 In. Diam. 59.25 fn. Lgth. 40 Sch. Steel
Column Couplings J Style Steel
Suction Pipe 10 In. Diem. 120 In, Lgth. 40 Sch Steel
11 Bear, Retainers 10 In. Diem. 0.75 In_ Ring Tickness Bronze
Rubber Bearings 1.5 In, I.D. 2.5 In, O.D. 3 5/8 In, Lgth. Rubber
Head Shaft 1.5 In. O.D. 64.5 In, Lgth. 8 TPI - Mat .416 SS
Int. Shaft 1.5 In. O.D. 120 In. Lgth. 8 TPI - Mat .416 SS
Bot. Shaft 1.5 In. O.D. In. Lgth. 8 TPI- Mat .416 SS
Shaft Cowl 1.5 In. I.D. In. Lgth. 8 TR - Mat. .416 SS
Sleeve 1-11/16 In, I.D. 1-1/2 In. O.D. 7 In. Lgth. .416 SS
Replace Bowls - Mfg. American-Marsh 12KC Model 5 Stages. Cl- Enamel 1000 GPM 269 Head 1770 RPM 83%
12 Stickup Brz Imp Mat CI Bowl Mat, Serial No. 188030 Imp Diam 9.1875 Imp Mat. Bronze
Bowl Shaft 1 5 x 1.6875 In, O.D. 73.75 In. Lgth. TPI - Mat. .416 SS _ Disch. Brg. In, I.D. in. O.D. In. Lgth. Bronze
Seris Brg. In, I.D. In, O.D. In, Lgth. Bronze
Suction Brg fn. I.D. In, O.D. In. Lgth, Bronze Collets Fit Worn Material .416 SS Impellers 9 In Diameter Material Bronze Wear Rings In. I.D. Material Impeller Disch.Case Soft Material CI
3 Serie Case Soft Material CI
Suct. Case Soft Material CI Bowl Bolts Material .4'16 SS Pipe 1" Sch 80 T&C 220 Coupling 1" PVC Soh 80 11 PVC Cap 1" Sch 80 FP 2 PVC 1" Plug FIP 2
Other: Televise Well ?
11 1
10
11
3
1
220 1
2 2
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031203614
County Hennepin Entry Date 08/24/1991
Quad Hopkins Update Date 09/24/2015
Quad ID 104B Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 12 117 21 W 30 BABBAA 1080 ft. 1080 ft. 05/00/1964
Elevation 940 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55424
Geological Material From To (ft.) Color Hardness
SAND 0 45
SANDY CLAY 45 54
SAND 54 88
SANDY CLAY 88 109
PLATTVILLE 109 122
SOAPSTONE 122 126
ST. PETER 126 295
SHAKOPEE 295 409
JORDAN 409 497
ST. LAWRENCE 497 545
FRANCONIA 545 680
DRESBACH 680 743
EAU CLAIRE 743 831
MT. SIMON 831 984
HINCKLEY 984 1079
RED CLASTICS 1079 1080
Stratigraphy Information
Casing Diameter Weight
16 955in. To ft. lbs./ft.
24 116in. To ft. lbs./ft.
Hole Diameter
23 108in. To ft.
Screen? MakeType955Open Hole From ft. To ft.1080
Static Water Level
Pumping Level (below land surface)
Material FromAmount Toneat cement ft. ft.117 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report203614
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.252 Measureland surface 05/00/1964
ft.329. hrs. Pumping at 1200 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012 BAKER, E.
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Mid.Prot. sed. undividedMinnesota Department of Health
Mt.Simon109
GPS Differentially Corrected (25 meters)System X Y468819 4974191
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
INVOICE NO.:000134460000 CUSTOMER NO.:03443 DATE: 11/19/13
TO: Public Works 7450 Metro Blvd. Well No 12 Edina, MN 55439
SALES- ORDER PERSON DATE P.O. NUMBER
NOV 2 0 2013
CITY OF EDINA `PUBLIC WORKS/
enner & Sons E, H INCORPORA E WELL DRIL T FOR FIVE GENERATIONS 15688 JARVIS ST. N.W. • ELK RIVER, MN 55330 PHONE: (763)427-6100 • FAX: (763)427-0533 www.ehrenner.com
t SOLD TO: SHIP
City of Edina Attn: Dave Goergen 7450 Metro Blvd. Edina, MN 55439
SHIP DATE SHIPPED VIA F.O.B. TERMS
INVOICE
11/14/13 12R Site NET 30 02 06/03/13 Contract
UNIT QUANTITY DESCRIPTION
PRICE
AMOUNT
Final Invoice Well No 12 Remove, Reinstall, Test & Chlorinate Remove & install add pump Shop Time Brush Well Casing Video Well Discharge Pipe 8" x 20' T&C Flomatic Check Valves Paint Exposed Surface Reinstall Water Monitor Chlorinate Well Stainless Steel Collets Repair 250Hp Plueger 14" Motor Repair Plueger Register
7,400.00 7,400.00 15.42 1,233.60 75.00 1,500.00
1,650.00 1,650.00 1,380.00 1,380.00
666.00 3,996.00 1,230.00 2,460.00
300.00 300.00 300.00 300.00 300.00 300.00 35.00 385.00
7,814.00 7,814.00 5,912.00 5,912.00
1
1
80 20 1 1 6 2 1 1 1
11 1 1
SUB-TOTAL 34,630.60 SHIPPING CHARGES
0.00 * THANK Y 0 U *
SALES TAX 0.00
TOTAL 34,630.60
WHITE-CUSTOMER YELLOW-OFFICE PINK-SEND BACK WITH PAYMENT
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031203613
County Hennepin Entry Date 08/24/1991
Quad Hopkins Update Date 09/24/2015
Quad ID 104B Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 13 117 21 W 30 BABBAA 495 ft. 495 ft. 05/00/1964
Elevation 940 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Contact EDINA MN 55424
Geological Material From To (ft.) Color Hardness
SAND 0 39
SANDY CLAY 39 58
SAND 58 79
SANDY CLAY 79 104
PLATTVILLE 104 119
SOAPSTONE 119 123
ST. PETER 123 292
SHAKOPEE 292 412
JORDAN 412 494
ST. LAWRENCE 494 495
Stratigraphy Information
Casing Diameter Weight
16 429in. To ft. lbs./ft.
24 109in. To ft. lbs./ft.
Screen? MakeType429Open Hole From ft. To ft.495
Static Water Level
Pumping Level (below land surface)
Material FromAmount Toneat cement ft. ft.44 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report203613
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.96.6 Measureland surface 05/00/1964
ft.150. hrs. Pumping at 2000 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012 O'BRIEN, F.
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Jordan104
Digitization (Screen) - Map (1:24,000) (15 meters orSystem X Y468829 4974191
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995Info/GPS from data
Angled Drill Hole
2014 17- } OF EDIN \LI BLI.c
Eft Penner & Sons Inc.orporat
FELLING FOR FENS GENERATIONS
Ls Stoat REEF AAAnesota ORES Fto A27-51OF I Fax INS
June 10, 2014
City of Edina David Goergen Public Utilities Coordinator 5145 Eden Ave Edina, MN 55424
Subject: Well No 13
Re: Invoice Invoice No. 13754
Description Material Discharge Bowl Bearing - All Bronze Discharge Head Bearing and Packing 10" Cone Strainer - Weld On - Galvanized Head Shaft 1-11/16" Misc. (Tape, bandit, food grade grease, etc.) Chlorinate well Video Log of Well Pump Removal & transport to shop Pump installation & startup
Shop time, disassemble and staging pump for installation
Total Amount of this Repair
Qty Jnits Price Extension
1 Ea. $259.00 $259.00 1 Ea. $ 289.00 $289.00 1 Ea. $285.00 $285.00 1 Ea. $667.00 $667.00 1 Ea. $173.00 $173.00 1 Ea. $300.00 $300.00 1 L.S. $1,300.00 $1,300.00 1 Ea. $3,800.00 $3,800.00 1 Ea. $3,600.00 $3,600.00 5 Hrs. $196.00 $980.00
$11,653.00
If you need additional information or have questions, I can be contacted at my office 763-390-8206 or on my cell phone at 651-755-3200.
Sincerely
-&/44/
Jerry Aljets Project Manager E.H. Renner & Sons, Inc.
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031207674
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 03/31/2016
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 15 117 21 W 29 DBBADC 475 ft. 475 ft. 06/15/2002
Elevation 897 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid Water
Address Use community supply(municipal) Status Active
Well Hydrofractured? XYes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well 5005 MIRROR LAKE DR EDINA MN 55436
Geological Material From To (ft.) Color Hardness
SAND & CLAY 0 91
PLATTEVILLE ROCK 91 111
ST. PETER SAND 111 205
SHALE & SAND MIX 205 210 HARD
SHALE & SAND MIX 210 260
SHALE 260 265 HARDBLUE
ROCK 265 400
JORDAN SANDSTONE 400 405
JORDAN 405 475
Stratigraphy Information
Casing Diameter Weight
30 92in. To ft. lbs./ft.
20 275in. To ft. lbs./ft.
24 225in. To ft. lbs./ft.
Screen? MakeType275Open Hole From ft. To ft.475
Static Water Level
Pumping Level (below land surface)
M.G.S. NO. 434.
THE WELL WAS ORIGINALLY DRILLED IN 1967 AND RECONSTRUCTED IN 2002.
ORIGINALLY DRILLED BY LAYNE MINNESOTA CO. DRILLER GORDONHOLLEN.
Material FromAmount Toneat cement ft. ft.27 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report207674
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above gradeX
LAYNR
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.69 Measureland surface 11/00/1967
ft.110 hrs. Pumping at 1200 g.p.m.
200 feet South Direction Body of water TypeWell disinfected upon completion? X Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
13 ECH 150 480
1150160 Turbine
XYes No
Was a variance granted from the MDH for this well? Yes X No
Licensee Business Lic. or Reg. No. Name of DrillerBergerson-Caswell 27058 MANTHIR, D.
Remarks
Platteville Formation
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Prairie Du Chien-91
GPS Differentially Corrected (25 meters)System X Y470883 4973294
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995Information from
Angled Drill Hole
Turbine Pump Inspection Report
Job Name Well /5 Job # 80/6,/05— Date // ,-/er1/4/6
Mfg t ypc Size/Model E// Stages y Pump Setting A, 0% siu dI n Well Size
olq Well Depth/Measured q 00 Depth Orig C/66 Fill
Strainer yes
Tailpipe yes
Bowls
Bearings Top
Int
Bot
Wear Ring Top
Int
Bot
Bowl. Shaft size
Impellers open
Collets ss
Bolts & Nuts
Col/Shaft
Col Pipe
Shaft ss
n Shaft Couplings
❑ no
Ijic no D
Mic out at
Size
Good Recommend Quest Replace Customer OK
Size
.013 013 .,013
,013 X • 031°
, (>31 cos Amount X
Fe& X, 722 V ❑
❑
enclosed "FL # 4 Gterygginto carb 5,
XI/ coo CPO
Dia
Amount
Ai TBE 59-1/4 59-1/2
'V( flush
T&C 119-1/4 119-1/2 15 lS T&C 59-1/4 59-1/2
carb ❑ • Da I/ ,4 5'
0 / 194 Stene51.0' / Thread /0 /6'
Spider Bearings rsti /is/4 I 1p 140 Spiders
Headshaft
Motor Headshaft
Discharge Head
Pack Gland Bearing
Motor (hp)/make
PVC Tube/Probe
Mtsc Parts
Blast & Paint
Additional Repairs
JO" a" Pp 14 Acx fir
size As X /0" )( Rolla- ° 15' alAT /1%„xdfitx. c't --Are / fi-70 t,g_s pc,AJJe20__
geo Ito -
yes ❑ no 13
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031203101
County Hennepin Entry Date 08/24/1991
Quad Hopkins Update Date 03/10/2014
Quad ID 104B Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 16 116 21 W 6 ABDCCC 381 ft. 381 ft. 11/10/1967
Elevation 895 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
1 ft.Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well 1001 GLEASON RD EDINA MN 55439
Geological Material From To (ft.) Color Hardness
NO RECORD 0 45
ROCKS, GRAVEL 45 115
ST. PETER 115 175
SHALE 175 184 BLUE
SHALE, SAND 184 215 GRAY
SHALE 215 255 GRAY
ROCK-SHAKOPEE 255 380
JORDAN SANDSTONE 380 381
Stratigraphy Information
Casing Diameter Weight
20 265in. To ft. lbs./ft.
30 215in. To ft. lbs./ft.
Hole Diameter
30 381in. To ft.
Screen? MakeType265Open Hole From ft. To ft.381
Static Water Level
Pumping Level (below land surface)
M.G.S. NO. 435.
Material FromAmount Toneat cement ft. ft.
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report203101
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.66 Measureland surface 11/10/1967
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerLayne Well Co. 27010 DRECHSEL, B.
Remarks
St.Peter Sandstone
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Prairie Du Chien-115
GPS Differentially Corrected (25 meters)System X Y469482 4970571
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031200914
County Hennepin Entry Date 08/24/1991
Quad Minneapolis Update Date 12/31/2015
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 17 28 24 W 19 DBDAAC 461 ft. 461 ft. 11/17/1970
Elevation 873 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
C/W EDINA MN
Geological Material From To (ft.) Color Hardness
CLAY 0 76
SANDY CLAY 76 131
GRAVEL 131 133
SANDROCK 133 196 SOFT
SHALE 196 201
SHAKOPEE 201 363
JORDAN 363 461
Stratigraphy Information
Casing Diameter Weight
24 373in. To ft. lbs./ft.
30 196in. To ft. lbs./ft.
Screen? MakeType373Open Hole From ft. To ft.461
Static Water Level
Pumping Level (below land surface)
M.G.S. NO. 663
Material FromAmount Toneat cement ft. 373 ft.30 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report200914
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.59 Measureland surface 11/17/1970
ft.123 hrs. Pumping at 2500 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012 SITTIG, R.
Remarks
St.Peter Sandstone
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Jordan133
GPS Differentially Corrected (25 meters)System X Y473563 4971458
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 03/22/1993Information from
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031200918
County Hennepin Entry Date 08/24/1991
Quad Bloomingto Update Date 01/07/2016
Quad ID 104D Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 18 28 24 W 32 BDDBBD 446 ft. 446 ft. 10/16/1973
Elevation 855 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Casing Type Step down
No
Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well EDINA MN 55424
Geological Material From To (ft.) Color Hardness
CLAY 0 14
SAND AND CLAY 14 61
SAND AND GRAVEL 61 223
CLAY AND GRAVEL 223 232
LIMEROCK 232 347
SANDROCK 347 440
SANDROCK 440 446
Stratigraphy Information
Casing Diameter Weight
30 150in. To ft. lbs./ft.
16 365in. To ft. lbs./ft.
24 232in. To ft. lbs./ft.
Hole Diameter
23 446in. To ft.
Screen? MakeType365Open Hole From ft. To ft.446
Static Water Level
Pumping Level (below land surface)
M.G.S. NO. 945.
Material FromAmount Toneat cement ft. 365 ft.36 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report200918
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above grade
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.61.3 Measureland surface 10/16/1973
ft.103. hrs. Pumping at 1016 g.p.m.
feet Direction TypeWell disinfected upon completion? Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
0
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Co. 62012 O'BRIEN, F.
Remarks
Prairie Du Chien Group
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Department of Health
Jordan232
GPS Differentially Corrected (25 meters)System X Y474656 4968640
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995Information from
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031505626
County Hennepin Entry Date 06/29/1992
Quad Minneapolis Update Date 10/05/2015
Quad ID 104A Received Date
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 19 116 21 W 5 CBCCBC 521 ft. 520 ft. 10/26/1989
Elevation 944 ft. Elev. Method Calc from DEM (USGS 7.5 min or equiv.) Drill Method Cable Tool Drill Fluid
Address Use community supply(municipal) Status Active
Well Hydrofractured? Yes
No
From To
Welded2 ft.
Casing Type Step down
No
X Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well 6054 VALLEYVIEW RD EDINA MN 55425
Geological Material From To (ft.) Color Hardness
CLAY 0 52 YELLOW
CLAY 52 70 BLUE
CLAY & GRAVEL 70 182 BROWN
ST. PETER 182 195 TAN
ST. PETER 195 207 WHITE
ST. PETER 207 228 TAN
SHALE & ST. PETER 228 240 LT. BLU
ST. PETER 240 260 TAN
ST. PETER & SHALE 260 302 BLUE
SHAKOPEE DOLOMITE 302 428 TAN
JORDAN SANDSTONE 428 521 WHITE
Stratigraphy Information
Casing Diameter Weight
30 30 118.in. To ft. lbs./ft.
18 440 70.5in. To ft. lbs./ft.
24 243 94.6in. To ft. lbs./ft.
Screen? MakeType440Open Hole From ft. To ft.520
Static Water Level
Pumping Level (below land surface)
M.G.S. NO. 2963.
Material FromAmount Toneat cement ft.0 440 ft.63 Cubic yardsneat cement ft.0 242 ft.6 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report505626
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above gradeX
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.163 Measureland surface 10/26/1989
ft.202 hrs.3 Pumping at 1200 g.p.m.
feet Direction TypeWell disinfected upon completion? X Yes
Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
Yes No
Was a variance granted from the MDH for this well? Yes No
Licensee Business Lic. or Reg. No. Name of DrillerRenner E.H. Well 71015 LEDBETER, B.
Remarks
St.Peter Sandstone
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
Jordan SandstoneMinnesota Department of Health
Jordan182
GPS Differentially Corrected (25 meters)System X Y470092 4969770
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/21/1995Information from
Angled Drill Hole
Minnesota Unique Well NumberMINNESOTA DEPARTMENT OF HEALTH
WELL AND BORING REPORTMinnesota Statutes Chapter 1031686286
County Hennepin Entry Date 07/09/2008
Quad Hopkins Update Date 10/06/2015
Quad ID 104B Received Date 07/18/2008
Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well CompletedEDINA 20 116 21 W 6 ABABCD 467 ft. 467 ft. 06/30/2008
Elevation 881 ft. Elev. Method 7.5 minute topographic map (+/- 5 feet) Drill Method Cable Tool Drill Fluid Bentonite
Address Use community supply(municipal) Status Active
Well Hydrofractured? XYes
No
From To
Casing Type Step down
No
X Above/BelowYesDrive Shoe?Joint
Contact 4801 50TH ST W EDINA MN 55424
Well GLEASON RD EDINA MN 55424
Geological Material From To (ft.) Color Hardness
CLAY, SAND , GRAVEL 0 40 SOFTBROWN
CLAY, SAND , GRAVEL 40 125 SOFTBROWN
SAND & GRAVEL 125 180 SOFTBROWN
CLAY & SAND 180 200 SOFTGRAY
SAND & GRAVEL 200 207 SOFTBROWN
SANDSTONE & SHALE 207 211 MEDIUMTAN
SANDSTONE & SHALE 211 247 MEDIUMTAN
SANDSTONE & SHALE 247 248 MEDIUMTAN
LIMESTONE 248 375 HARDTAN
SANDSTONE 375 380 MEDIUMWHITE
SANDSTONE 380 460 MEDIUMWHITE
SHALE 460 463 MEDIUMGREEN
SHALE 463 467 MEDIUMGREEN
Stratigraphy Information
Casing Diameter Weight
30 187 118.in. To ft. lbs./ft.
18 265 20.5in. To ft. lbs./ft.
24 210 94.6in. To ft. lbs./ft.
Hole Diameter
30 187in. To ft.24 264in. To ft.18 467in. To ft.
Screen? MakeType264Open Hole From ft. To ft.467
Static Water Level
Pumping Level (below land surface)
GAMMA LOGGED 6-27-2008. M.G.S. NO. 4841. LOGGED BY JIM TRAEN.
Material FromAmount Toneat cement ft. 264 ft.16 Cubic yardsneat cement ft. 187 ft.12 Cubic yards
Wellhead Completion
Pump
Nearest Known Source of Contamination
Abandoned
Variance
Well Contractor
Minnesota Well Index Report686286
HE-01205-15
Printed on 01/14/2020
Pitless adapter manufacturer Model
At-grade (Environmental Wells and Borings ONLY)Casing Protection 12 in. above gradeX X
X
Does property have any not in use and not sealed well(s)?
Grouting Information Well Grouted? Yes No Not Specified
No
ft.90 Measureland surface 06/11/2008
ft.105 hrs.24 Pumping at 1200 g.p.m.
100 feet West Direction Septic tank/drain field TypeWell disinfected upon completion? X Yes
X Not Installed Date InstalledManufacturer's name
Model Number HP VoltLength of drop pipe Capacity Typft g.p.
XYes No
Was a variance granted from the MDH for this well? Yes X No
Licensee Business Lic. or Reg. No. Name of DrillerKeys Well Drilling Co. 1347 GALVIN, M.
Remarks
St.Peter Sandstone
Miscellaneous
Last Strat
AquiferDepth to Bedrock
Located by
Locate Method
First Bedrock
St.Lawrence FormationMinnesota Geological Survey
Prairie Du Chien-211
Digitization (Screen) - Map (1:24,000) (15 meters orSystem X Y469502 4970896
ft
UTM - NAD83, Zone 15, Meters
Unique Number Verification Input Date 07/09/2008Info/GPS from data
Angled Drill Hole
WATER LEVEL MONITORING PLAN
WELL 2 (Unique Well #208399)
The water level monitoring plan for Well 2 follows MDH requirements. Samples are collected from this well annually. Well 2 is located in township 28, range 24 in section 18 and subsection CAABDD.
WELL 3 (Unique Well #240630)
The water level monitoring plan for Well 3 follows MDH requirements. Samples are collected from this well annually. Well 3 is located in township 28, range 24 in section 18 and subsection DDACDB.
WELL 4 (Unique Well #200561)
The water level monitoring plan for Well 4 follows MDH requirements. Samples are collected from this well annually. Well 4 is located in township 28, range 24 in section 19 and subsection BDCBBB.
WELL 5 (Unique Well #206377)
The water level monitoring plan for Well 5 follows MDH requirements. Samples are collected from this well annually. Well 5 is located in township 28, range 24 in section 29 and subsection CCCBBA.
WELL 6 (Unique Well #200564)
The water level monitoring plan for Well 6 follows MDH requirements. Samples are collected from this well annually. Well 6 is located in township 28, range 24 in section 19 and subsection CBACBC.
WELL 7 (Unique Well #206474)
The water level monitoring plan for Well 7 follows MDH requirements. Samples are collected from this well annually. Well 7 is located in township 28, range 21 in section 28 and subsection CCDDBA.
WELL 8 (Unique Well #204884)
The water level monitoring plan for Well 8 follows MDH requirements. Samples are collected from this well annually. Well 8 is located in township 116, range 21 in section 5 and subsection DAAABD.
WELL 9 (Unique Well #206588)
The water level monitoring plan for Well 9 follows MDH requirements. Samples are collected from this well annually. Well 9 is located in township 117, range 21 in section 32 and subsection DADAAC.
WELL 10 (Unique Well #206184)
The water level monitoring plan for Well 10 follows MDH requirements. Samples are collected from this well annually. Well 10 is located in township 28, range 24 in section 31 and subsection CDAAAA.
WELL 11 (Unique Well #206183)
The water level monitoring plan for Well 11 follows MDH requirements. Samples are collected from this well annually. Well 11 is located in township 28, range 24 in section 31 and subsection DCBBBB.
WELL 12 (Unique Well #203614)
The water level monitoring plan for Well 12 follows MDH requirements. Samples are collected from this well annually. Well 12 is located in township 117, range 21 in section 30 and subsection BABBAA.
WELL 13 (Unique Well #203613)
The water level monitoring plan for Well 13 follows MDH requirements. Samples are collected from this well annually. Well 13 is located in township 117, range 21 in section 30 and subsection BABBAA.
WELL 15 (Unique Well #207674)
The water level monitoring plan for Well 15 follows MDH requirements. Samples are collected from this well annually. Well 15 is located in township 117, range 21 in section 29 and subsection DBBADC.
WELL 16 (Unique Well #203131)
The water level monitoring plan for Well 16 follows MDH requirements. Samples are collected from this well annually. Well 16 is located in township 116, range 21 in section 7 and subsection BAABDD.
WELL 17 (Unique Well #200914)
The water level monitoring plan for Well 17 follows MDH requirements. Samples are collected from this well annually. Well 17 is located in township 28, range 24 in section 19 and subsection DBDAAC.
WELL 18 (Unique Well #200918)
The water level monitoring plan for Well 18 follows MDH requirements. Samples are collected from this well annually. Well 18 is located in township 28, range 24 in section 32 and subsection BDDBBD.
WELL 19 (Unique Well #505626)
The water level monitoring plan for Well 19 follows MDH requirements. Samples are collected from this well annually. Well 19 is located in township 116, range 21 in section 5 and subsection CBCCBC.
WELL 20 (Unique Well #686286)
The water level monitoring plan for Well 20 follows MDH requirements. Samples are collected from this well annually. Well 20 is located in township 116, range 21 in section 6 and subsection ABABCD.
Well Monitoring Plan
City of Edina, Minnesota
Well
Name
MN
Unique
Well #
Location Aquifer Type MeasuringMeasurement
Method
Monitoring
Frequency
Recording
Frequency
Reporting
Frequency
Well No. 2 208399 WooddalePrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 3 240630 HalifaxPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 4 200561 ConcordPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 5 206377 SouthdalePrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 6 200564 Community CenterPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 7 206474 Sherwood ParkPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 8 204884 RidgeviewPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 9 206588 Hanson Mt. Simon Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 10 206184 Fred Richards GC Mt. Simon Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 11 206183 Fred Richards GC Jordan Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 12 203614 Alden Park Mt. Simon Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 13 203613 Alden Park Jordan Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 15 207674 Mirror Lakes Jordan Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 16 203101 Creek ValleyPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 17 200914 Pamela ParkPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Well No. 18 200918 York Ave Jordan Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 19 505626 High School Jordan Municipal Well Water LevelsSCADA
TransducerContinuous Daily Monthly
Well No. 20 686286 Gleason RoadPrairie-Du-
Chien-JordanMunicipal Well Water Levels
SCADA
TransducerContinuous Daily Monthly
Appendix 3 Water Level Graphs for Each Water
Supply Well (Part 1E)
Water Supply Plan Edina, Minnesota
WELL WATER LEVEL GRAPHS
WELL 2 (Unique Well #208399)
The static water drawdown in Well 2 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 98 feet to 72 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
20
40
60
80
100
120
Draw
dow
n Le
vel (
ft)
Year
Well 2 Static Drawdown Level
Static
WELL 3 (Unique Well #240630)
The static water drawdown in Well 3 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 107 feet to 70 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
20
40
60
80
100
120
Draw
dow
n Le
vel (
ft)
Year
Well 3 Static Drawdown Level
Static
WELL 4 (Unique Well #200561)
The static water drawdown in Well 4 has varied from 2007-2012. Over this timeframe records indicate that drawdown ranged from 124 feet to 84 feet. Overall, the trend in drawdown has been increasing, resulting in lower groundwater levels.
0
20
40
60
80
100
120
140
Draw
dow
n Le
vel (
ft)
Year
Well 4 Static Drawdown Level
Static
WELL 5 (Unique Well #206377)
The static water drawdown in Well 5 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 90 feet to 70 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0102030405060708090
100
Draw
dow
n Le
vel (
ft)
Year
Well 5 Static Drawdown Level
Static
WELL 6 (Unique Well #200564)
The static water drawdown in Well 6 has varied from 2007-2016. Over this timeframe records indicate that drawdown ranged from 192 feet to 113 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
50
100
150
200
250
Draw
dow
n Le
vel (
ft)
Year
Well 6 Static Drawdown Level
Static
WELL 8 (Unique Well #204884)
The static water drawdown in Well 8 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 100 feet to 70 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
20
40
60
80
100
120
Draw
dow
n Le
vel (
ft)
Year
Well 8 Static Drawdown Level
Static
WELL 9 (Unique Well #206588)
Well 9 is an inactive well, and yearly drawdown is not monitored.
WELL 10 (Unique Well #206184)
The static water drawdown in Well 10 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 304 feet to 181 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
50
100
150
200
250
300
350
Draw
dow
n Le
vel (
ft)
Year
Well 10 Static Drawdown Level
Static
WELL 11 (Unique Well #206183)
The static water drawdown in Well 11 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 40 feet to 32 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
.
0
5
10
15
20
25
30
35
40
45
Draw
dow
n Le
vel (
ft)
Year
Well 11 Static Drawdown Level
Static
WELL 12 (Unique Well #203614)
The static water drawdown in Well 12 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 407 feet to 32 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
50
100
150
200
250
300
350
400
450
Draw
dow
n Le
vel (
ft)
Year
Well 12 Static Drawdown Level
Static
WELL 13 (Unique Well #203613)
The static water drawdown in Well 13 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 186 feet to 119 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
020406080
100120140160180200
Draw
dow
n Le
vel (
ft)
Year
Well 13 Static Drawdown Level
Static
WELL 15 (Unique Well #207674)
The static water drawdown in Well 15 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 131 feet to 94 feet. Overall, the trend in drawdown has been increasing, resulting in lower groundwater levels.
0
20
40
60
80
100
120
140
Draw
dow
n Le
vel (
ft)
Year
Well 15 Static Drawdown Level
Static
WELL 16 (Unique Well #203131)
The static water drawdown in Well 16 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 122 feet to 71 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
20
40
60
80
100
120
140
Draw
dow
n Le
vel (
ft)
Year
Well 16 Static Drawdown Level
Static
WELL 17 (Unique Well #200914)
The static water drawdown in Well 17 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 90 feet to 58 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0102030405060708090
100
Draw
dow
n Le
vel (
ft)
Year
Well 17 Static Drawdown Level
Static
WELL 18 (Unique Well #200918)
The static water drawdown in Well 18 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 75 feet to 53 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
10
20
30
40
50
60
70
80
Draw
dow
n Le
vel (
ft)
Year
Well 18 Static Drawdown Level
Static
WELL 19 (Unique Well #505626)
The static water drawdown in Well 19 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 196 feet to 152 feet. Overall, the trend in drawdown has been increasing, resulting in lower groundwater levels.
0
50
100
150
200
250
Draw
dow
n Le
vel (
ft)
Year
Well 19 Static Drawdown Level
Static
WELL 20 (Unique Well #686286)
The static water drawdown in Well 20 has varied from 2007-2017. Over this timeframe records indicate that drawdown ranged from 136 feet to 77 feet. Overall, the trend in drawdown has been decreasing, resulting in higher groundwater levels.
0
20
40
60
80
100
120
140
160
Draw
dow
n Le
vel (
ft)
Year
Well 20 Static Drawdown Level
Static
CAPITAL IMPROVEMENT PLAN
The City of Edina last updated their Capital Improvement Plan in 2017. This plan gives details about the City’s future projects from 2017-2021.
CITY OF EDINA, MINNESOTA
CAPITAL IMPROVEMENT PLAN
2017‐2021
EDINA CITY COUNCIL
Mayor James Hovland Council Member Mary Brindle Council Member Kevin Staunton Council Member Bob Stewart Council Member Ann Swenson
1
2
3
. Introduct Organ Vision CIP in CIP P Proce Use o Priorit Fundin
. CIP Sum CIP fu CIP p CIP p CIP p Unfun
. Detail Pr Projec
C
tion Summnization n Edina ntroduction olicy
ess of estimates ties ng sources a
maries unding sourcrojects by furojects by carojects by d
nded project
roject Datacts sorted by
CITY OF ED
mary
and financing
ce summary unding sourcategory epartment ts
a y project nu
DINA, MINN
g
ce
umber
NESOTA
CAPITA
TABLE AL IMPROV
OF CONTEVEMENT P
1 2 3 3 4 5 5 6
15 16 25 29 34
37-375
ENTS PLAN
ORG The Cand lfour otherhiringmemand M The Redea toothe Cand CCity and/o The Cand “opeAdmi
GANIZATI
City of Edinegislative auother membr things, forg the City bers elected
Mayor are el
City Counevelopment Aol to manageCity of EdinaCity Staff carof Edina, or
or the HRA.
City Managefor overseerating” depinistration D
CITY O
ON
a operates uuthority are bers, all elecr approving Manager. C
d every twoected at larg
ncil also seAuthority (He redevelopma. In additiorry out the r similar ter
er is responseing the dapartments aDepartment w
OF EDINA,
under the Cvested in a
cted on a no ordinancesCouncil meo years. Thege.
erves concuHRA). The Hment. The bn, the City daily operatrms may be
sible for carray-to-day opand three which includ
MINNESO
Council-ManaCity Counc
on-partisan b, adopting tmbers serv
e Mayor also
urrently as HRA was estborders of tManager se
tions of the used throu
rying out theperations o“supporting
des the City
OTA
CAPITA
ager form ocil (Council) basis. The Cthe budget, ve four-yearo serves a f
Commissiotablished bythe HRA areerves as ExeHRA. For th
ughout this d
e policies anof the city g” departm Manager an
INAL IMPROV
of governme consisting o
Council is res appointing r terms, wifour-year te
oners of thy the City Ce identical toecutive Direchese reasondocument t
nd ordinancegovernment
ments, in and Assistant
NTRODUCTVEMENT P
Page
nt. Policy-mof the Mayosponsible, amcommittees
ith two Corm. The Co
he Housingouncil in 19o the bordector of the s the terms o mean the
es of the Cot. Edina haaddition toCity Manage
TION PLAN
1
making r and mong s and ouncil ouncil
g and 74 as
ers of HRA City,
e City
ouncil as six the er.
VISION Staff worstrategic communstrategic Work on Edina’s Vmodel ofmodern residents Eight keyareas, anleverage displace tcommunrepresenfocus are
1. R2. T3. C4. L5. E6. P7. E8. R
N EDINA
rk is guided frameworkity visioning efforts, incn the Compr
Vision Statemf a successfuand evolvin
s the highest
y strategic fd the attend and guide tthe underlyiity services,
nt key emergeas are:
Residential deTransportatioCommercial ive and worducational foopulation mnvironmenta
Regional lead
CITY OF E
d by Vision k in Vision g process. Vcluding the rehensive Pl
ment is “Edinul, mature, ag world. Wt quality of li
focus areas dant issues athe future eng foundatio governanceging prioritie
evelopment on options developmenk ocus ix al stewardshership
EDINA, MI
Edina, the C Edina is tVision EdinaCapital Impan is anticipa
na holds a wand progres
We maintain fe, while act
emerged tand actions, evolution ofonal work the and fiscal mes, and refle
mix
nt mix
hip
INNESOTA
City’s long-rthe outcoma serves as provement ated to start
well-earned ressive urban cour heritagetively embra
hrough the represent ef our city. That continuemanagementect the core
A
CAPITAL I
range strateme of a bro
an importaPlan and tht in 2016.
eputation ascommunity, e and attraccing the futu
Vision Edinemerging priThe list is nes on our ket. Rather, th
e drivers of o
INTRMPROVEM
egic plan. Thoad-based a
ant foundatiohe Compre
s a city of ch that strivesctiveness, anure.
na process. ority areas t
not inclusiveey areas of inhese strategiour future.
RODUCTIONMENT PLAN
Page 2
he vision anand inclusivon for othehensive Plan
hoice. It is ths to lead in nd afford ou
These focuthat can bote nor does nfrastructuric focus areaThe strateg
N N
nd ve er n.
he a ur
us th it e, as ic
CAP In addmoreplan (infrastowacosts The C
CAP The maketakingmuni The CCIP projethat d The projeCIP m The C Adop Revis
PITAL IMP
dition to pue routine cap(CIP). The Cstructure, facrds our long
s and source
City conside th th th fut alt
PITAL IMP
goal of the ers to guideg into accoucipal service
City will devprocess inc
ects helping tdefine a futu
City will idect proposal must still be
CIP will inclu
pted by City
sions:
CITY O
ROVEMEN
rsuing the stpital maintenCIP represencilities, equipg-term visions of revenue
ers the followe condition e estimated e available rture operatiternatives fo
ROVEMEN
City’s CIP e capital inveunt the bestes.
velop a five-cludes analyzto maintain
ure need wit
entify the e in the CIP. properly au
ude equipme
Council
OF EDINA,
NT PLAN (
trategic focunance and imnts a framewpment and tn. The CIP ises to pay for
wing factors of infrastruc cost of proj
resources ing budgets or providing
NT PLAN (
is to develestments ba
t use of limit
-year plan fozing projectand improvehin the com
estimated co Purchase cothorized acc
ent and proj
February 2
March 20, December
MINNESO
(CIP) INTR
us areas outlmprovementwork for plan
echnology ws the first str high priorit
when prepacture, facilitijects
services
(CIP) POL
op a compased on an ted resource
or capital imts contribute the efficienmunity.
ost and potontracts for cording to th
ects from an
20, 2007
2007 15, 2009
OTA
CAPITA
RODUCTI
ined in Visios by preparinning the prewhile at the sep towards ty projects.
aring the CIPies, equipme
LICY
rehensive passessment
es while pro
mprovementsting to the ncy of the e
tential fundir equipment he City’s Pu
ny City fund
INAL IMPROV
ION
on Edina, theng a capital eservation asame time a estimating t
P: ent and techn
program for t of the comoviding effici
s and update public hea
existing syste
ing sources and projectrchasing Pol
.
NTRODUCTVEMENT P
Page
e City plans improvemen
and expansioadvancing the schedule
nology
use by decmmunity’s nient and effe
e it annuallyalth and weems, and pro
for each cts included ilicy.
TION PLAN
3
for nt
on of
e,
cision needs, ective
y. The elfare, ojects
apital n the
PROCE The Cityoperatingbudget ayear, the During oare dedictake effeupdated During ededicatedavailable In 2016 commentposted sgatheredinput in m For bothinformatirole is toevery evdevelop again con Importan
Mo
M Ju Se D D
ESS
y implementg budget. Tnd CIP proc majority of
odd-numberecated to citizct on Januarif necessary.
even-numbed to review at the time.
the City cot during theeveral quest feedback. Imore familia
h the CIP anion and deveo guide Cityven-numberemore recom
nsidered by t
nt milestoneMay 2016: Enline on the
May 2016: Staune 2016: Coeptember 20
December 20December 20
CITY OF E
ted a two-yhe objectivecesses. Whilf the planning
ed years, thezen engagemry 1 of the fo.
ered years, ing the proj The operat
ontinued oure process totions about n addition t
ar ways such
nd the operelop a recom
y staff througed year. Afmmendationthe City Co
s for the 20Encourage ree City’s Speaaff level detaouncil retrea016: City Ma016: Hold pu016: Council
EDINA, MI
year budgete is to take e both the og, focus and
e City’s focument procesollowing eve
the City’s ects in the
ting budget is
r practice oo develop t the 2015-2to this webs as City Cou
rating budgemmendation gh the procefter adoptios about howuncil before
17-2021 CIPesident part
ak Up Edina! ail work begat to discussanager recomublic hearingl adopts fina
INNESOTA
t cycle proc an alternatoperating bu effort will a
us will be onsses and a twen-numbered
focus will CIP and pris reviewed b
f providing the 2017-202019 CIP onsite initiativeuncil meetin
et, it is the for the Cityess and to fo
on of the Cw to procee work starts
P developmeticipation & website. ins. s CIP procesmmended Cg for proposal 2017-2021
A
CAPITAL I
cess beginnting year apudget and CIalternate bet
n the operatwo-year oped year. The
be on the oritizing thebut only upd
opportunitie021 CIP. Dun the Speake, the City cgs and publi
responsibility Council toormally ado
Capital Impred with spes, in most ci
ent process a input using
ss. CIP presente
ed budget, l CIP.
INTRMPROVEM
ing with thpproach to tIP will be retween the tw
ting budget. erating budg CIP is revie
CIP. Extraem based ondated if nece
es for publiuring May 2k Up, Edina!continued toc hearings.
ty of City sto consider. Copt a CIP nerovement Pecific projectrcumstances
are shown bg a CIP sur
d to Councievy & CIP.
RODUCTIONMENT PLAN
Page 4
he 2012-201the operatin
eviewed everwo.
Extra effortet, which w
ewed but on
a efforts arn informatioessary.
c review an016 the Cit website ano seek publ
taff to gatheCity Councilar the end olan, staff wts, which ars.
below: rvey availab
il.
N N
3 ng ry
ts ill ly
re on
nd ty nd ic
er ’s of ill re
le
EST The pscopeestimestimmore PRIO Whilproce2015are sprioradopt The C
PriormonesourcprojesourcThe believwritttimin
IMATES
preparation e, costs of la
mates come mates, or a coe precise tha
ORITIES
e prioritizatess that stan-2019 CIP. et by the C
rities are thtion.
City uses a 71. Critic2. 3. Signifi4. 5. Impor6. 7. Desira
ritization is aey to do allces, but maects do not ces of fundinyears for uves the proen. If future g will change
CITY O
of a 5 year Cabor and mafrom staff
ombination an later year
ion has alwandardizes prThe prioriti
City Council hen submitte
7-point prioral
cant
rtant
able
a critical pa the project
any don’t. Thave reliabl
ng will allowunfunded projects could funding is ide.
OF EDINA,
CIP requiresaterials, futuexperience
of several sos. Actual res
ays been parriorities acrization procand interpred to the
ritization sca
art of the Cts that we w
There is a le funding as
w the City torojects are be done ifdentified to
MINNESO
s City staff tre interest r, projectionources. Gensults can diff
rt of the CIPross functioncess consideeted by CityCity Counc
ale that is re
CIP process would like tlist of unfuns of the wrio complete shown for f funding we complete th
OTA
CAPITA
o make matrates and otns publishednerally the esfer significan
P process, thns and depaers strategic y staff. The cil for cons
epresented a
because theto. Some prnded projeciting of this some of threference oere availablehe unfunded
INAL IMPROV
terial estimatther items. Md in other stimates for tly from suc
he City impleartments, be goals and o staff recomsideration, m
as follows:
e City doesrojects havects later in CIP. It is pese projectsonly as the e at the tim
d projects, it
NTRODUCTVEMENT P
Page
tes about prMany times tsources, ve earlier year
ch estimates
emented a foeginning withobjectives, wmended CIP
modification,
sn’t have ene reliable fu this CIP. Tpossible thats in future y years that me this CIPt is likely tha
TION PLAN
5
roject these endor rs are .
ormal h the which P and , and
nough nding
These t new years. staff
P was at the
FUNDIN Planning Edina haeach impconsiderabased onCity usesincludes The Citybudget isthe annupast projthis planbetween are those
NG SOUR
for capital s many opt
provement isations. The
n the ability os to pay forconstruction
y’s annual cos spent on oal budget alsjects. The fi. The graph governmene that typica
CITY OF E
RCES AND
improvemeions for funs based on tfinal selectioof the City tr CIP projecn costs, adm
mprehensiveoperating cosso pays for dnal part of t
hic below isntal activitiesally have CIP
EDINA, MI
FINANCI
nts requiresnding sourcethe City’s geon and schedto draw upocts are restrministration c
e budget is asts to providdebt servicethe budget a conceptus and enter needs.
INNESOTA
NG
s sound andes and finaneneral policiduling of pron various fu
ricted as to costs and int
approximatede services,
e on debt thais for capitaual diagram rprise activit
A
CAPITAL I
d economicacing. The exies, past praoposed capitnds. Many ouse. The toterest.
ely $110 mil like employat has alreadal improvem of the Cityties. The are
INTRMPROVEM
al financing. xact funding
actices, legal tal improvem
of the fundingotal cost for
lion dollars. yees and vendy been issu
ments, and isy’s budget, weas highlight
RODUCTIONMENT PLAN
Page 6
The City og method fo and practicments is theg sources th each projec
Much of thandors. Part oued to pay fos the focus owhich is splted in yellow
N N
of or al
en he ct
at of or of lit w
The f
1
ConstF
A
D
Ava
Eq
Cab
D
M
following me
. Construdifferent include:
a. CalracLiqar
b. CprreGo
c. CsoputoEqploite
truction und
Special Assessments
Grants & Donations
ailable Funding
quipment
ble Franchise
Park edication
MSA
CITY O
ethods of fun
ction Fundsources of
onstructioready identiction. This caquor Fund.
re no spendinonstructioroviders forestricted toovernmentaonstructio
ource to reurposes. Thio buy essenquipment puows, passenems.
HRA Fund
Centennial Lakes TIF
Grandview T
Cahill/VV TI
Southdale
Pentagon P
Grandview
OF EDINA,
nding for gov
d – This fufunding for
n Fund: Aified and traategory also Finally, this ng restriction Fund: Cr each Edino use on al (PEG) progn Fund: Eeplace all ts revolving f
ntial equipmurchased unnger cars an
Go
TIF
IF
2 TIF
Park TIF
2 TIF
PACS Fund
Utility Franchis
MINNESO
vernmental
und is desig CIP project
Available Fuansferred in includes bucategory inc
ons on theseCable PEG na subscribe
projects gramming. quipment the equipmfund is repleent withoutder this prond trucks,
overnmental Funds
d
e
PD SpeciaRevenue Fu
E911
Forfeitu
OTA
CAPITA
projects ma
gned to prts. Construc
unding inclnto the Codgeted trancludes a new
e revenue so is repleniser to theirthat benef
Levy is dement currenenished by at the additogram incluand even la
al nd
re
BraemarMemoria
Fund
Dona
INAL IMPROV
ay be include
rovide accoction Fund
udes Genernstruction Fsfers from tw (in 2017)
ources. hed by a fe
r services. fit Public,
esigned to ptly used fo
a tax levy andional costs
udes squad awn mower
r al
ations
EnvironmentEfficiency Fun
One time Insurance settlement
NTRODUCTVEMENT P
Page
ed in this CIP
unting for revenue so
ral Fund resFund by Cothe Utility Fu CIP Levy. T
ee paid by This revenuEducational
provide a fuor governmd allows theof issuing
cars, fire trrs, among o
tal nd
t
CAS Fun
Utility Fra
TION PLAN
7
P:
many urces
erves ouncil und & There
cable ue is l, or
nding mental e City debt.
rucks, other
d
anchise
2. Hthth
d. Consdonatgoverbusinecities benefivia redonat
e. ConsMinneassistaas parportioreleasconstrthe Msevera
f. ConsCode develotrails, collecreven
g. Conswhen of theimproover ato coflow descri
Housing andhe activities his fund inclu
a. HRA districunits olonger
b. HRA increm
CITY OF E
struction tions the Cnments. Wesses or coto accept g
it of its citizsolution ado
tions can be struction Fesota Deparance for imprt of its MSAon of revenused for imprruction mee
MSA system al years. struction F for new suopment or wetlands o
cted when sues are diffic
struction F land is benee improvemeovements. Foa period of ullect special purposes.
iption of this
d Redeveloof the Housude: Fund: Cahcts, propertyof local gover generating Fund: Cenment district
EDINA, MI
Fund: Graity may rec
We also mommunity ogrants and dzens provideopted by a t difficult to pFund: Munirtment of Tprovements A system. Mues collecteovements o
et MSA stand at any tim
Fund: Park ubdivisions. Timprovemenor open spsubdivisions cult to plan fund: Speciefited from aent should bor larger speup to 15 yea assessmentSee Public s financing to
opment Ausing and Red
hill VV TIF y owners payernment wit new tax incntennial Lats, property
INNESOTA
ants and ceive from ay receive
organizationsdonations oed the City two thirds mplan for in adicipal Stat
Transportatioto those mu
Money for thed from roadn those stredards. Funds
me, and MSA
DedicatioThese fees mnt of parks,pace. Becauoccur, and for in advanal Assessm
a particular ibe levied agaecial assessmars. Since it ots, the City Improvemool.
uthority (Hdevelopment
is a tax incry ad valorem
thin the taxincrements. akes TIF is owners pay
A
CAPITAL I
Donationthe Federal donations s. Minnesotaf real or peCouncil aut
majority of idvance. te Aid (MSon (MnDOTunicipal strehis fund is sd use and geets on the ss may be exA funds ma
n Fees aremay be used, recreationse Park De subdivisionce of receip
ments are bimprovemeninst those p
ments, owneoften takes smay decide
ment Revolv
HRA) Fund.t Authority.
rement distrm taxes at thng jurisdictio
a tax incremy ad valorem
INTRMPROVEM
ns includes l, State, and from loca Statute 4ersonal propthorizes sucits members
SA) is a graT) that proveets which aupplied with
gasoline taxesystem whopended for ay be accum
specified ind for the ac
nal facilities, edication Fe
ns are rare pt. ased on the nt, all or parroperties tors may pay tseveral year to issue bo
ving Bonds
. This fund aSources of r
rict. In tax inhe full rate leon. This dist
ment districtm taxes at the
RODUCTIONMENT PLAN
Page 8
grants and other local resident
465.03 allowperty for thch acceptancs. Grants an
ant from thvides fundinre designateh a dedicatees. Funds arse design anany street omulated ove
n Edina’s Citcquisition an playgroundees are onin Edina, th
concept thart of the costo finance sucthe City bacs for the Citonds for cas for furthe
accounts forrevenue in
ncrement evied by therict is no
t. In tax e full rate
N N
nd al
ts, ws he ce nd
he ng ed ed re nd on er
ty nd s, ly
he
at ts ch ck ty sh er
r
3
4
5
6
7
levdis
c. Hdisunlo
d. Hdisun
e. Hinclev
f. Hdisun
. ConservCity creabe used fo
. PedestriCity creabe used fsidewalks
. Environmproceeds new fund
. PD Specsources tinclude E-
a. PDup
b. PDcead
. Braemar
formally rIt is used
CITY O
vied by the ustrict is no lRA Fund: Gstricts, propnits of local gnger generatRA Fund: Gstricts, propnits of local gRA Fund: Pcrement distvied by the uRA Fund: Sstricts, propnits of local g
vation and ted a new for projects t
ian and Cyted a new ffor projects, paths and t
mental Eff of an insura to be used
cial Revenuthat have re-911 and fedD Special pgrade 911 cD Special ertain cases dvance.
r Memoriarecognized a to account
OF EDINA,
units of locaonger generGrandview
perty ownersgovernment ting new taxGrandview
perty ownersgovernment Pentagon Ptricts, propeunits of locaSouthdale
perty ownersgovernment
Sustainabfund in 2016that promot
yclist Safetfund in 2013s that promtrails.
ficiency Fuance settlemfor new pro
ue Fund. Thestrictions o
deral and staRevenue F
communicatiRevenue after the le
al Fund Doas a separatefor funds do
MINNESO
l governmenrating new ta
w 1 TIF is a s pay ad valo within the tx increments
w 2 TIF is a s pay ad valo within the tPark TIF iserty owners l governmen 2 TIF is a ts pay ad valo within the t
ility (CAS)6 that collecte conservat
ty (PACS)3 that collecote pedestr
nd. The Citment. The insojects and in
he Police Deon how the
ate forfeitureFund: E911ions equipmFund: Forfegal process
onations. Te special revonated to th
OTA
CAPITA
nt within theax incremen tax incremeorem taxes ataxing jurisds. tax incremeorem taxes ataxing jurisds a tax increm pay ad valont within thetax incremenorem taxes ataxing jurisd
) Fund: Utcts money frtion and sust
) Fund: Utcts money frrian and bik
ty created asurance proitiatives that
epartment ce money cae funds. 1 Grant is
ment. feiture is ms is finished.
This accounvenue fund bhe City for t
INAL IMPROV
e taxing jurisnts. ent district. Iat the full raiction. This
ent district. Iat the full raiction. ment districrem taxes ate taxing jurisnt district. Inat the full raiction.
tility Francrom a utilitytainability.
tility Francrom a utilityke safety, us
a new fund oceeds were t had enviro
collects revean be spent
money the
money the . It is difficu
nt was creatby the City the purpose
NTRODUCTVEMENT P
Page
sdiction. Thi
In tax incremate levied by district is no
In tax incremate levied by
t. In tax t the full ratsdiction. n tax incremate levied by
chise Fees.y franchise fe
chise Fees.y franchise fesually by bu
in 2013 wit deposited inmental ben
enue from set. These so
City receiv
City receivult to plan f
ted in 1976 Council in 2 of enhancin
TION PLAN
9
s
ment the o
ment the
te
ment the
. The fee to
. The fee to uilding
h the n the
nefits.
everal urces
es to
ves in for in
6 and 2010.
ng the
Baf
The follo
8. Useraanco
Utility Fund
Water
Sewer
Storm
Braemar Golffordable or
owing metho
Utility Enteervices, watate studies tnd capital completed in
a. Utilitdisposcapita
b. Utilitdrainaservic
c. Utilitserviccosts
Liquor Fund
CITY OF E
lf Course w viewed as a
ods of fundin
erprise Funter, sewer, sto help deteosts of run the fall of 2ty Fund: Ssal and treatal, and debt sty Fund: Stage services.ce costs of pty Fund: Wce. This reveof providing
Aquatic Center Fund
G
EDINA, MI
with equipmea necessity to
ng for enterp
nds – The Cstorm sewermine if revening these s
2015. Sewer is rtment servicservice coststorm is rev This revenuroviding stoWater is enue can beg water serv
Enter
Golf Course Fund Ar
INNESOTA
ent and ameo the golf co
prise project
City operatr and recycenue collectservices in t
revenue recces. This res of providinvenue receivue can be sprm service. revenue re
e spent on oice.
rprise Funds
rena Fund
No excess revenue for
CIP
Art CF
Nre
A
CAPITAL I
enities that ourse.
ts may be inc
tes one Utilicling. The Cted will be sthe future.
ceived fromevenue can bng sewer served from cuspent on ope
eceived fromoperational,
Center und
No excess evenue for
CIP
EdinborPark F
SpenRe
INTRMPROVEM
might not o
cluded in thi
ity Fund thaCity periodic
ufficient to pThe last ra
m customerbe spent onrvice. stomers for rational, cap
m customercapital, and
rough Fund
nd Down eserves?
CentennLakes Fu
No ereven
C
RODUCTIONMENT PLAN
Page 10
otherwise b
is CIP:
at offers foucally conductpay operatin
ate study wa
rs for sewen operationa
storm watepital, and deb
rs for wate debt servic
nial nd
excess nue for CIP
Sports Dome Fund
N N
be
ur ts ng as
er al,
er bt
er ce
d
9
1
1
. Aquatic Center. Rimprovem
0. Arena F
Backyard improvemoperationoften req
1. Art CenRevenue improvemnot sufficfor capita
CITY O
Center FuRevenue genments and de
und. This f area. Reven
ments and dns is not sufuired for cap
nter Fund. generated
ments relatedient to cove
al improveme
OF EDINA,
und. This funerated at thebt service r
und accountnue generateebt service fficient to cpital improv
This fund aat this fa
d to runninger 100% of ents to the E
MINNESO
nd accounts is facility can
related to ru
ts for the aced at this fac related to over 100% ements to B
accounts foracility can g the Edina Athese costs,Edina Art Ce
OTA
CAPITA
for the activn be spent ounning the A
ctivities of Bcility can be running Braof these co
Braemar Are
r the activitibe spent Art Center. , so additionenter.
INAL IMPROV
vities of the on operationAquatic Cent
Braemar Are spent on oaemar Arenaosts, so addena.
ies of the Eon operatio Revenue frnal funding
NTRODUCTVEMENT P
Page 1
Edina Aquatns, capital ter.
ena, includinperations, ca. Revenue
ditional fund
dina Art Ceons and c
rom operatiois often req
TION PLAN
1
tic
ng the apital from ing is
enter. apital ons is uired
12. CPimnfo
13. E
Rimsuca
14. G
inRanhexBge
Centennial ark. Revenu
mprovementot sufficientor capital im
EdinborougRevenue genmprovementufficient to capital improv
Golf Coursencluding theRevenue genend debt servistorically hxecuting a p
Braemar Golenerated at
CITY OF E
Lakes Funue generatets related tot to cover 1provements
gh Fund. Tnerated at ts related tocover 100%vements to
e Fund. The Braemar erated at thvice related as not beenplan designef Course exthe facility.
EDINA, MI
nd. This fundd at this fa
o running Ce00% of thes
s to Centenn
This fund acthis facility
o running Edi% of these co
Edinborough
his fund accoGolf Domeis facility cato running B
n sufficient ted to changexpenses will
INNESOTA
d accounts facility can bentennial Lakse costs, so nial Lakes Pa
ccounts for y can be inborough Posts, so addh Park.
ounts for thee, the Acadn be spent oBraemar Goto cover 10e that for th be recover
A
CAPITAL I
for the activbe spent onkes Park. Rev additional f
ark.
the activitiespent on
Park. Revenuditional fund
e activities odemy 9 Coon operatioolf Course. R00% of theshe future, sored by user
INTRMPROVEM
vities of Cenn operationvenue from funding is of
es of Edinboperations
ue from opeing is often
of Braemar ourse and dns, capital imRevenue frose costs, buo that 100%fees and ot
RODUCTIONMENT PLAN
Page 12
ntennial Lakes and capit operations ften require
orough Par and capitrations is no required fo
Golf Coursdriving rangemprovementm operation
ut the City % or more other revenue
N N
es tal is
ed
k. tal ot or
e, e. ts ns is of es
1
1
5. Liquor F
operationoperationrevenues enterpriserevenue i
6. Sports D
Revenue improvem
CITY O
Fund. This n, Edina Liqns and capit are approes like the s also appro
Dome Fungenerated
ments related
OF EDINA,
fund accounquor. Revental improvemopriated to Arena, Art
opriated to t
nd. This fuat this fa
d to running
MINNESO
nts for the nue receivedments relat
o support t Center ahe General
und accountacility can g Braemar Fi
OTA
CAPITA
activities ofd from liquted to liquoother City
and Golf CoFund and Co
ts for the be spent eld.
INAL IMPROV
f the City’s uor sales cor sales. In y activities, ourse Fundonstruction
activities ofon operatio
NTRODUCTVEMENT P
Page 1
municipal lan be spenaddition, ex including
ds. Excess l Fund.
f Braemar ons and c
TION PLAN
3
iquor nt on xcess park
iquor
Field. apital
17. BHfrdsoth
Bond FinanHRA may decrom the proifferent bonometimes lehe past are l
Enterthe CEnterpdesignfrom t
Tax bondsrevenrequir
Publiby the
Publiissuedassessthroug
Genefor thcurren
CITY OF E
ncing – Forcide to sell boject fundinnd programegal and fiscaisted below.
rprise ReveCity issues pprise Revenned to be rethe projectsIncrements to pay TIF ue that is gred. ic Project Le HRA and bic Improved for streesment receipgh special as
eral Obligae City to usntly has CIP
EDINA, MI
r many of thbonds to payg sources a
ms that theal requireme.
enue Bondpay for Utilinue Bonds epaid with res financed, tht Bonds – project costgenerated b
Lease Revebacked by thement Revoet improvempts over a fssessments, ation (GO) se. Although bonds. GO
INNESOTA
he above fuy the upfronare not imme City usesents. A few o
ds – Most ofity Fund profor any of
evenues fromherefore no The City hts. The bondby the distr
enue Bondhe City throuolving (PIRment projefifteen-year therefore no – There are no new issu debt may re
A
CAPITAL I
unding sourcnt costs of a mediately avs, each witof the progr
f the Enterpoject costs, our enterp
m the enterp levy is requas previousds are repairict; therefo
ds – These bugh an annuaR) Bonds –ects and aperiod. Theo levy is reqe several typues are incluequire a levy
INTRMPROVEM
ces, the Cit project wh
vailable. Theth differentrams the Cit
prise Revenu but the Ciprises. Thesprise facilitieired. ly issued Tad with the t
ore no addit
bonds are tyal appropria
– PIR bonds re repaid
ese bonds aquired. pes of GO duded in this y.
RODUCTIONMENT PLAN
Page 14
ty and/or then cash flow
ere are mant names anty has used i
ue Bonds thaity may issuse bonds ares that benef
ax Incrementax incrementional levy
ypically issueation. are generalwith specire supporte
debt availabplan, the Cit
N N
he ws ny nd in
at ue re fit
nt nt is
ed
ly al
ed
le ty
Capital Improvement Plan
City of Edina, MN
CIP FUNDING SOURCE SUMMARY
2017 thru 2021
TotalSource 2017 2018 2019 2020 2021
Aquatic Center Fund 320,000160,000 160,000
Braemar Memorial Fund Donations 79,00079,000
Construction Fund: Available Funding 1,409,700293,100 370,000 303,000 226,300 217,300
Construction Fund: Cable PEG 80,26013,300 3,000 57,960 6,000
Construction Fund: Equipment Levy 11,451,1611,412,722 2,417,697 2,270,600 1,758,132 3,592,010
Construction Fund: Grants & Donations 525,00025,000 200,000 175,000 125,000
Construction Fund: Municipal State Aid 8,034,9271,350,000 1,199,596 2,510,133 2,975,198
Construction Fund: Special Assessments 20,937,1234,145,309 3,756,755 3,531,025 4,145,725 5,358,309
E911 75,00027,500 47,500
Environmental Efficiency Fund 67,90067,900
General Fund 2,615,000575,000 500,000 500,000 500,000 540,000
Golf Course Fund 270,00081,000 85,000 34,000 34,000 36,000
HRA Fund: Centennial Lakes TIF 3,425,000475,000 650,000 1,500,000 750,000 50,000
HRA Fund: Grandview 2 TIF 734,000451,000 283,000
HRA Fund: Southdale 2 TIF 3,000,0003,000,000
Liquor Fund 113,00078,000 35,000
PACS Fund: Utility Franchise Fees 2,866,831848,100 1,042,905 615,524 125,000 235,302
Southwest Cable Commission 46,70046,700
Utility Fund: Sewer 11,889,2783,023,203 2,156,860 1,746,386 2,567,598 2,395,231
Utility Fund: Storm 15,641,9332,835,402 3,082,629 3,443,517 2,405,989 3,874,396
Utility Fund: Water 23,228,1674,970,404 9,766,357 1,922,255 3,597,890 2,971,261
23,506,640 25,425,799 16,597,767 19,034,767 22,245,007 106,809,980GRAND TOTAL
Thursday, November 17, 2016Page 15
Capital Improvement Plan
City of Edina, MN
CIP PROJECTS BY FUNDING SOURCE
2017 2021thru
TotalSource Project# Priority 2017 2018 2019 2020 2021
Aquatic Center Fund
15-045 160,000160,000Aquatic Center Zero Depth Pool Filter 3
15-044 160,000160,000Aquatic Center Plunge Pool Filter 3
320,000160,000 160,000Aquatic Center Fund Total
Braemar Memorial Fund Donations
17-034 24,00024,000Braemar Restaurant Patio Furniture 5
17-032 25,00025,000Braemar Golf Entry Pond Fountains 6
17-035 30,00030,000Braemar Restaurant Patio Trellis 7
79,00079,000Braemar Memorial Fund Donations Total
Construction Fund: Available Funding
15-002 300,000200,000 100,000Comprehensive Plan 1
15-072 85,00085,000Braemar Arena South Condensing Tower Replacement
1
17-051 21,00021,000Police AED Replacements 1
17-134 50,00050,000Public Works CO and NO2 Sensor Replacement 1
17-151 22,10022,100Firefighting Personal Protective Gear Dryer 1
17-152 185,000185,000Fire Station Alerting System 1
17-163 50,00050,000City of Edina Network Storage 2
15-086 225,000225,000Braemar Arena Roof Replacement 2
15-183 346,600129,300 217,300GIS Infrastructure 2
17-030 25,00025,000Braemar Golf Cart Storage Upgrade 2
17-162 28,00028,000City of Edina Firewall Agents 2
17-041 72,00072,000Edinborough Park Fitness Equipment Replacement 3
1,409,700293,100 370,000 303,000 226,300 217,300Construction Fund: Available Funding Total
Construction Fund: Cable PEG
15-182 66,9603,000 57,960 6,000CTS Equipment Replacement 1
17-164 13,30013,300SWTV HD Upgrade Tightrope Cablecast System 5
80,26013,300 3,000 57,960 6,000Construction Fund: Cable PEG Total
Thursday, November 17, 2016Page 16
TotalSource Project# Priority 2017 2018 2019 2020 2021
Construction Fund: Equipment Levy
15-182 1,576,000150,000 471,000 672,000 187,000 96,000CTS Equipment Replacement 1
17-057 280,00030,000 250,000Police Dispatch Radio Console Connectivity 1
17-049 175,000175,000ARMER Radios (Public Works) 1
15-196 200,000200,000Ambulance Replacement 1
15-005 1,076,000288,000 136,000 194,000 338,000 120,000Police Squad Cars 1
17-192 120,000100,000 20,000HRIS 2
15-107 4,250,661674,222 709,197 1,008,100 862,132 997,010PW and Park Maintenance Equipment Replacement 2
17-059 14,00014,000Police Glock Service Weapons 2
15-226 67,50022,500 22,500 22,500Election Equipment Replacement 2
15-227 57,00057,000Hydraulic Rescue Tools Replacement (2019) 2
15-206 180,000180,0002012 Ambulance 2
15-204 19,00019,000Siren #9 Replacement 2
15-201 70,00070,000Fire Command Staff Vehicle (2017) 3
17-159 16,00016,000Outdoor Warning Siren #4 3
17-160 14,00014,000Lucas 2 Chest Compression Device 3
17-155 20,00020,000Building Inspections Staff Vehicle (2020) 3
17-194 60,00060,000Hydraulic Rescue Tools Replacement (2021) 3
17-054 1,000,0001,000,000Police Public Safety CAD and RMS 3
15-203 550,000550,000Fire Engine Replacement 3
15-194 40,00040,000Inspections Division Vehicle Replacement (2017) 3
15-207 105,000105,000Fire Department Staff Vehicles Replacement 3
15-205 21,00021,000Inspections Division Vehicle Replacement (2018) 3
15-009 27,00027,000Police Squad Rifles 4
17-158 40,00040,000Utility Pick-up Truck 4
17-161 900,000900,000Aerial Apparatus (Tower 90) 4
17-154 18,00018,000Floor Scrubber 4
17-157 100,000100,000EOC Video/Computer Technology 4
15-003 30,00015,000 15,000Assessing Division Equipment Replacement 4
15-013 39,00039,000Police Squad Radar Units 4
15-181 130,00028,000 75,000 27,000Engineering Equipment Replacement 4
17-052 36,00036,000Police License Plate Reader (ALPR) Replacement 5
15-011 140,000140,000Police Squad/Interview Room Video System 5
17-193 70,00070,000Fire Command Staff Vehicles (2019) 5
15-014 10,00010,000Police Radar Speed Trailer 6
11,451,1611,412,722 2,417,697 2,270,600 1,758,132 3,592,010Construction Fund: Equipment Levy Total
Construction Fund: Grants & Donations
17-073 175,000175,000Vernon Ave & SB TH100 Exit Ramp Free Right Removal
6
17-074 125,000125,00050th Street and NB TH100 Entrance Ramp Free Right
6
17-010 225,00025,000 200,000York Avenue Landscaping Improvements 7
525,00025,000 200,000 175,000 125,000Construction Fund: Grants & Donations Total
Thursday, November 17, 2016Page 17
TotalSource Project# Priority 2017 2018 2019 2020 2021
Construction Fund: Municipal State Aid
17-022 200,000200,00060th Street and Xerxes Ave Traffic Signal 1
17-021 200,000200,000Valley View Rd Rear Yard Retaining Wall 2
15-128 1,349,596150,000 1,199,596W 62nd Street Reconstruction 2
17-020 2,975,1982,975,198Blake Road Reconstruction 2
15-126 800,000800,000Parklawn Avenue Reconstruction 2
17-019 2,510,1332,510,133West 76th Street/Edinborough Way Reconstruction
2
8,034,9271,350,000 1,199,596 2,510,133 2,975,198Construction Fund: Municipal State Aid Total
Construction Fund: Special Assessments
15-174 170,000170,000Chowen Park D Reconstruction 1
15-138 3,177,1013,177,101Birchcrest A/Countryside B Neighborhood St Recon
2
17-027 598,208598,208Countryside G Reconstruction 2
15-128 299,899299,899W 62nd Street Reconstruction 2
17-020 743,799743,799Blake Road Reconstruction 2
15-126 200,000200,000Parklawn Avenue Reconstruction 2
17-060 397,470397,470Bredesen Park A/E Reconstruction 2
17-061 1,828,3251,828,325Concord A/G Reconstruction 2
17-019 627,533627,533West 76th Street/Edinborough Way Reconstruction
2
17-062 79,41979,419Country Club C Reconstruction 2
15-141 777,888777,888Chowen Park B Neighborhood Street Reconstruction
3
17-063 1,125,8341,125,834Indian Trails B/C Reconstruction 3
17-064 337,673337,673Todd Park E/G Reconstruction 3
17-066 432,258432,258Creek Valley C Reconstruction 3
17-067 2,506,1302,506,130Morningside D/E Reconstruction 3
15-137 1,151,6421,151,642Normandale Park D Neighborhood Street Reconstruct
3
15-140 1,289,6301,289,630Chowen Park A Neighborhood Street Reconstruction
3
17-026 1,780,6961,780,696Melody Lake A Reconstruction 4
17-065 390,130390,130Countryside C Reconstruction 4
17-023 189,674189,674Interlachen Park B Reconstruction 4
15-145 1,183,4981,183,498Countryside I Neighborhood Street Reconstruction 4
17-024 423,427423,427Grandview A Reconstruction 4
17-025 1,226,8891,226,889Hilldale Reconstruction 4
20,937,1234,145,309 3,756,755 3,531,025 4,145,725 5,358,309Construction Fund: Special Assessments Total
Thursday, November 17, 2016Page 18
TotalSource Project# Priority 2017 2018 2019 2020 2021
E911
17-055 20,00020,000Police CAD Workstations 2
17-056 27,50027,500Police Dispatch Audio Logging 2
17-058 27,50027,500Police Emergency Medical Dispatch Software 3
75,00027,500 47,500E911 Total
Environmental Efficiency Fund
15-056 67,90067,900Edinborough Park Interior Entryway Doors 2
67,90067,900Environmental Efficiency Fund Total
General Fund
15-002 75,00075,000Comprehensive Plan 1
15-097 500,000100,000 100,000 100,000 100,000 100,000Minor Bridge Repairs 1
15-121 500,000100,000 100,000 100,000 100,000 100,000Seal Coating - Deferred Maintenance 1
15-122 1,500,000300,000 300,000 300,000 300,000 300,000Mill and Overlay - Deferred Maintenance 1
15-183 40,00040,000GIS Infrastructure 2
2,615,000575,000 500,000 500,000 500,000 540,000General Fund Total
Golf Course Fund
15-061 131,00030,000 31,000 34,000 36,000Braemar Golf Greens Mowers Replacement 4
15-060 105,00051,000 54,000Braemar Golf Fairway Mowers Replacement 4
15-064 34,00034,000Braemar Golf Small Rough Mowers Replacement 4
270,00081,000 85,000 34,000 34,000 36,000Golf Course Fund Total
HRA Fund: Centennial Lakes TIF
15-225 600,000200,000 200,000 200,000HRA - Promenade Phase V 3
17-012 750,000750,000Vernon Avenue Intersection Improvements 5
17-009 300,000300,000W 66th St & York Ave Intersection Improvements 6
17-016 500,000500,000W 66th St & Barrie Ave Intersection Improvements 6
17-008 100,000100,000Sidewalk at Wooddale and Valley View Ridge 6
17-013 500,000500,000W 66th St & Drew Ave Intersection Improvements 6
15-189 250,00050,000 50,000 50,000 50,000 50,000Gateway Signs 7
17-010 225,00025,000 200,000York Avenue Landscaping Improvements 7
17-011 200,000200,000W 69th Street Eastbound Left Turn Lane 7
3,425,000475,000 650,000 1,500,000 750,000 50,000HRA Fund: Centennial Lakes TIF Total
HRA Fund: Grandview 2 TIF
17-014 451,000451,000Arcadia Avenue Improvements 5
17-015 283,000283,000New Street to Jerry's Foods from Eden Avenue 6
734,000451,000 283,000HRA Fund: Grandview 2 TIF Total
Thursday, November 17, 2016Page 19
TotalSource Project# Priority 2017 2018 2019 2020 2021
HRA Fund: Southdale 2 TIF
17-002 3,000,0003,000,000HRA Land Acquisition for Affordable Housing 3
3,000,0003,000,000HRA Fund: Southdale 2 TIF Total
Liquor Fund
17-001 78,00078,000Grandview/50th Camera System 3
15-210 35,00035,000Liquor - 50th Conveyor System 3
113,00078,000 35,000Liquor Fund Total
PACS Fund: Utility Franchise Fees
15-128 22,17322,173W 62nd Street Reconstruction 2
15-138 392,175392,175Birchcrest A/Countryside B Neighborhood St Recon
2
17-061 66,93766,937Concord A/G Reconstruction 2
17-020 53,09553,095Blake Road Reconstruction 2
15-126 34,20034,200Parklawn Avenue Reconstruction 2
17-060 77,69577,695Bredesen Park A/E Reconstruction 2
17-027 91,92591,925Countryside G Reconstruction 2
17-068 75,00075,000Pedestrian and Bicycle Plan Update 3
15-154 254,800254,800Oaklawn Avenue Sidewalk 3
15-141 76,02476,024Chowen Park B Neighborhood Street Reconstruction
3
17-069 318,100318,100W 58th Street Sidewalk 3
17-070 458,000458,000Valley View Road Sidewalk 3
17-026 54,20554,205Melody Lake A Reconstruction 4
17-025 128,002128,002Hilldale Reconstruction 4
17-071 100,000100,000Vernon Ave & Eden Ave Intersection Improvements
4
17-072 364,500364,500Highway 169 Frontage Road Sidewalk 5
17-073 175,000175,000Vernon Ave & SB TH100 Exit Ramp Free Right Removal
6
17-074 125,000125,00050th Street and NB TH100 Entrance Ramp Free Right
6
2,866,831848,100 1,042,905 615,524 125,000 235,302PACS Fund: Utility Franchise Fees Total
Southwest Cable Commission
17-164 46,70046,700SWTV HD Upgrade Tightrope Cablecast System 5
46,70046,700Southwest Cable Commission Total
Thursday, November 17, 2016Page 20
TotalSource Project# Priority 2017 2018 2019 2020 2021
Utility Fund: Sewer
15-174 17,68217,682Chowen Park D Reconstruction 1
17-077 820,000820,000Presidents Area Sewer Rehabilitation, Area A 2
17-019 144,356144,356West 76th Street/Edinborough Way Reconstruction
2
17-079 50,00050,000Centennial Lakes I/I Repair 2
17-062 16,18016,180Country Club C Reconstruction 2
17-061 372,490372,490Concord A/G Reconstruction 2
17-060 80,97880,978Bredesen Park A/E Reconstruction 2
17-027 121,875121,875Countryside G Reconstruction 2
17-020 171,102171,102Blake Road Reconstruction 2
15-108 207,50025,000 25,000 17,000 66,500 74,000Utilities Equipment Replacement 2
15-126 106,800106,800Parklawn Avenue Reconstruction 2
15-128 120,000120,000W 62nd Street Reconstruction 2
15-138 1,271,8461,271,846Birchcrest A/Countryside B Neighborhood St Recon
2
17-066 88,06588,065Creek Valley C Reconstruction 3
17-078 1,200,0001,200,000Lake Edina and South Cornelia Trunk Sewer Rehab 3
15-141 158,481158,481Chowen Park B Neighborhood Street Reconstruction
3
17-067 940,552940,552Morningside D/E Reconstruction 3
17-064 68,79568,795Todd Park E/G Reconstruction 3
17-063 229,370229,370Indian Trails B/C Reconstruction 3
15-137 432,212432,212Normandale Park D Neighborhood Street Reconstruct
3
15-140 262,740262,740Chowen Park A Neighborhood Street Reconstruction
3
15-149 1,200,0001,200,000The Heights Trunk Sewer Rehabilitation 3
15-147 1,600,000600,000 1,000,000Sanitary Trunk Capacity Expansion 3
15-150 1,100,0001,100,000Minnehaha Trunk Sewer Rehabilitation 3
17-025 249,958249,958Hilldale Reconstruction 4
17-024 86,26686,266Grandview A Reconstruction 4
15-145 241,118241,118Countryside I Neighborhood Street Reconstruction 4
17-023 38,64338,643Interlachen Park B Reconstruction 4
17-065 79,48279,482Countryside C Reconstruction 4
17-026 362,787362,787Melody Lake A Reconstruction 4
15-173 50,00010,000 10,000 10,000 10,000 10,000Asset Management Software and Equipment 6
11,889,2783,023,203 2,156,860 1,746,386 2,567,598 2,395,231Utility Fund: Sewer Total
Thursday, November 17, 2016Page 21
TotalSource Project# Priority 2017 2018 2019 2020 2021
Utility Fund: Storm
15-174 56,12756,127Chowen Park D Reconstruction 1
17-062 51,36051,360Country Club C Reconstruction 2
17-019 384,455384,455West 76th Street/Edinborough Way Reconstruction
2
17-060 257,044257,044Bredesen Park A/E Reconstruction 2
17-027 286,862286,862Countryside G Reconstruction 2
15-126 284,400284,400Parklawn Avenue Reconstruction 2
15-128 183,732183,732W 62nd Street Reconstruction 2
17-020 455,685455,685Blake Road Reconstruction 2
15-138 2,053,0132,053,013Birchcrest A/Countryside B Neighborhood St Recon
2
15-108 295,00040,000 255,000Utilities Equipment Replacement 2
17-061 1,182,3801,182,380Concord A/G Reconstruction 2
17-063 728,078728,078Indian Trails B/C Reconstruction 3
17-064 218,373218,373Todd Park E/G Reconstruction 3
17-066 279,542279,542Creek Valley C Reconstruction 3
17-067 1,214,5311,214,531Morningside D/E Reconstruction 3
15-141 1,333,0611,333,061Chowen Park B Neighborhood Street Reconstruction
3
15-140 834,005834,005Chowen Park A Neighborhood Street Reconstruction
3
15-137 658,113658,113Normandale Park D Neighborhood Street Reconstruct
3
15-169 220,000110,000 110,000Flood Protection & Clean Water Improvements 4
17-023 112,663112,663Interlachen Park B Reconstruction 4
17-085 185,00065,000 45,000 37,500 37,500Braemar Golf Course Native Area 4
15-145 765,370765,370Countryside I Neighborhood Street Reconstruction 4
17-024 273,831273,831Grandview A Reconstruction 4
17-025 793,431793,431Hilldale Reconstruction 4
17-026 1,151,5791,151,579Melody Lake A Reconstruction 4
17-065 252,298252,298Countryside C Reconstruction 4
17-082 75,00075,000Sunnyslope Road Shoreline Stabilization 4
17-084 190,000190,0002018 Flood and Drainage Improvements 4
17-100 25,00025,000Blending Cabinet 4
17-083 400,00050,000 75,000 75,000 100,000 100,000Pond and Outlet Maintenance Projects 4
17-081 200,00025,000 150,000 10,000 10,000 5,000Arden Park Clean Water and Natural Resources 5
15-170 167,000167,000Comprehensive Water Resource Management Plan 5
15-173 75,00015,000 15,000 15,000 15,000 15,000Asset Management Software and Equipment 6
15,641,9332,835,402 3,082,629 3,443,517 2,405,989 3,874,396Utility Fund: Storm Total
Thursday, November 17, 2016Page 22
TotalSource Project# Priority 2017 2018 2019 2020 2021
Utility Fund: Water
17-102 160,00080,000 80,000SCADA PLC and PanelView Upgrades 1
15-101 120,000120,000Well #6 Rehab 1
15-174 22,22622,226Chowen Park D Reconstruction 1
17-105 120,000120,000Well #11 Rehab 2
15-138 1,663,9811,663,981Birchcrest A/Countryside B Neighborhood St Recon
2
15-102 120,000120,000Well #5 (West 69th St) 2
17-104 150,000150,000Well #8 Rehab 2
17-103 120,000120,000Well #7 Rehab 2
17-027 347,397347,397Countryside G Reconstruction 2
17-060 101,788101,788Bredesen Park A/E Reconstruction 2
17-020 435,537435,537Blake Road Reconstruction 2
17-062 20,33820,338Country Club C Reconstruction 2
17-019 367,456367,456West 76th Street/Edinborough Way Reconstruction
2
15-128 175,608175,608W 62nd Street Reconstruction 2
15-126 271,800271,800Parklawn Avenue Reconstruction 2
15-108 193,50025,000 28,000 66,500 74,000Utilities Equipment Replacement 2
15-103 120,000120,000Well #18 Rehab 2
17-061 468,213468,213Concord A/G Reconstruction 2
17-063 288,313288,313Indian Trails B/C Reconstruction 3
17-086 350,000350,000Well #9 Building and Process Rehab 3
17-064 86,47486,474Todd Park E/G Reconstruction 3
17-067 1,654,7571,654,757Morningside D/E Reconstruction 3
17-066 110,696110,696Creek Valley C Reconstruction 3
17-107 120,000120,000Well #19 Rehab 3
17-108 90,00090,000WTP #4 Interior Painting 3
15-162 8,750,0002,000,000 6,750,000New Water Treatment Plant 5 3
17-109 90,00090,000WTP #3 Interior Painting 3
15-141 199,208199,208Chowen Park B Neighborhood Street Reconstruction
3
15-140 330,260330,260Chowen Park A Neighborhood Street Reconstruction
3
15-137 760,410760,410Normandale Park D Neighborhood Street Reconstruct
3
15-105 75,00030,000 45,000Dublin Reservoir Pump Rehab 3
15-104 120,000120,000Well #16 Rehab 3
17-106 120,000120,000Well #12 Rehab 3
17-023 48,57348,573Interlachen Park B Reconstruction 4
17-065 99,90899,908Countryside C Reconstruction 4
17-026 456,017456,017Melody Lake A Reconstruction 4
17-024 108,435108,435Grandview A Reconstruction 4
15-145 303,080303,080Countryside I Neighborhood Street Reconstruction 4
17-025 314,192314,192Hilldale Reconstruction 4
17-080 2,050,00050,000 1,000,000 1,000,000Watermain Rehabilitation 5
15-173 50,00010,000 10,000 10,000 10,000 10,000Asset Management Software and Equipment 6
15-164 675,00075,000 600,000Well 21 and Raw Water Line 6
15-163 1,000,0001,000,000New Storage at WTP 5 6
23,228,1674,970,404 9,766,357 1,922,255 3,597,890 2,971,261Utility Fund: Water Total
Thursday, November 17, 2016Page 23
TotalSource Project# Priority 2017 2018 2019 2020 2021
106,809,98023,506,640 25,425,799 16,597,767 19,034,767 22,245,007GRAND TOTAL
Thursday, November 17, 2016Page 24
Capital Improvement Plan
City of Edina, MN
CIP PROJECTS BY CATEGORY
2017 2021thru
Total2017 2018 2019 2020 2021Category Project# Priority
Buildings
15-072 85,00085,000Braemar Arena South Condensing Tower Replacement
1
17-134 50,00050,000Public Works CO and NO2 Sensor Replacement 1
15-056 67,90067,900Edinborough Park Interior Entryway Doors 2
15-086 225,000225,000Braemar Arena Roof Replacement 2
17-030 25,00025,000Braemar Golf Cart Storage Upgrade 2
452,900117,900 85,000 225,000 25,000Buildings Total
Equipment and Vehicles
15-005 1,076,000288,000 136,000 194,000 338,000 120,000Police Squad Cars 1
15-182 1,642,960150,000 474,000 729,960 193,000 96,000CTS Equipment Replacement 1
15-196 200,000200,000Ambulance Replacement 1
17-049 175,000175,000ARMER Radios (Public Works) 1
17-051 21,00021,000Police AED Replacements 1
17-151 22,10022,100Firefighting Personal Protective Gear Dryer 1
15-107 4,250,661674,222 709,197 1,008,100 862,132 997,010PW and Park Maintenance Equipment Replacement 2
15-108 696,00065,000 305,000 45,000 133,000 148,000Utilities Equipment Replacement 2
15-206 180,000180,0002012 Ambulance 2
15-226 67,50022,500 22,500 22,500Election Equipment Replacement 2
15-227 57,00057,000Hydraulic Rescue Tools Replacement (2019) 2
17-059 14,00014,000Police Glock Service Weapons 2
15-044 160,000160,000Aquatic Center Plunge Pool Filter 3
15-045 160,000160,000Aquatic Center Zero Depth Pool Filter 3
15-194 40,00040,000Inspections Division Vehicle Replacement (2017) 3
15-201 70,00070,000Fire Command Staff Vehicle (2017) 3
15-203 550,000550,000Fire Engine Replacement 3
15-205 21,00021,000Inspections Division Vehicle Replacement (2018) 3
15-207 105,000105,000Fire Department Staff Vehicles Replacement 3
15-210 35,00035,000Liquor - 50th Conveyor System 3
17-041 72,00072,000Edinborough Park Fitness Equipment Replacement 3
17-155 20,00020,000Building Inspections Staff Vehicle (2020) 3
17-160 14,00014,000Lucas 2 Chest Compression Device 3
17-194 60,00060,000Hydraulic Rescue Tools Replacement (2021) 3
15-003 30,00015,000 15,000Assessing Division Equipment Replacement 4
15-009 27,00027,000Police Squad Rifles 4
15-013 39,00039,000Police Squad Radar Units 4
15-060 105,00051,000 54,000Braemar Golf Fairway Mowers Replacement 4
15-061 131,00030,000 31,000 34,000 36,000Braemar Golf Greens Mowers Replacement 4
15-064 34,00034,000Braemar Golf Small Rough Mowers Replacement 4
15-181 130,00028,000 75,000 27,000Engineering Equipment Replacement 4
Thursday, November 17, 2016Page 25
Total2017 2018 2019 2020 2021Category Project# Priority
17-100 25,00025,000Blending Cabinet 4
17-154 18,00018,000Floor Scrubber 4
17-158 40,00040,000Utility Pick-up Truck 4
17-161 900,000900,000Aerial Apparatus (Tower 90) 4
17-193 70,00070,000Fire Command Staff Vehicles (2019) 5
15-014 10,00010,000Police Radar Speed Trailer 6
11,268,2211,656,822 2,826,697 2,407,560 1,887,132 2,490,010Equipment and Vehicles Total
Infrastructure
15-002 375,000275,000 100,000Comprehensive Plan 1
15-097 500,000100,000 100,000 100,000 100,000 100,000Minor Bridge Repairs 1
15-101 120,000120,000Well #6 Rehab 1
15-121 500,000100,000 100,000 100,000 100,000 100,000Seal Coating - Deferred Maintenance 1
15-122 1,500,000300,000 300,000 300,000 300,000 300,000Mill and Overlay - Deferred Maintenance 1
15-174 266,035266,035Chowen Park D Reconstruction 1
17-022 200,000200,00060th Street and Xerxes Ave Traffic Signal 1
15-102 120,000120,000Well #5 (West 69th St) 2
15-103 120,000120,000Well #18 Rehab 2
15-126 1,697,2001,697,200Parklawn Avenue Reconstruction 2
15-128 2,151,008150,000 2,001,008W 62nd Street Reconstruction 2
15-138 8,558,1168,558,116Birchcrest A/Countryside B Neighborhood St Recon
2
15-204 19,00019,000Siren #9 Replacement 2
17-019 4,033,9334,033,933West 76th Street/Edinborough Way Reconstruction
2
17-020 4,834,4164,834,416Blake Road Reconstruction 2
17-021 200,000200,000Valley View Rd Rear Yard Retaining Wall 2
17-027 1,446,2671,446,267Countryside G Reconstruction 2
17-060 914,975914,975Bredesen Park A/E Reconstruction 2
17-061 3,918,3453,918,345Concord A/G Reconstruction 2
17-062 167,297167,297Country Club C Reconstruction 2
17-077 820,000820,000Presidents Area Sewer Rehabilitation, Area A 2
17-079 50,00050,000Centennial Lakes I/I Repair 2
17-103 120,000120,000Well #7 Rehab 2
17-104 150,000150,000Well #8 Rehab 2
17-105 120,000120,000Well #11 Rehab 2
15-104 120,000120,000Well #16 Rehab 3
15-105 75,00030,000 45,000Dublin Reservoir Pump Rehab 3
15-137 3,002,3773,002,377Normandale Park D Neighborhood Street Reconstruct
3
15-140 2,716,6352,716,635Chowen Park A Neighborhood Street Reconstruction
3
15-141 2,544,6622,544,662Chowen Park B Neighborhood Street Reconstruction
3
15-147 1,600,000600,000 1,000,000Sanitary Trunk Capacity Expansion 3
15-149 1,200,0001,200,000The Heights Trunk Sewer Rehabilitation 3
15-150 1,100,0001,100,000Minnehaha Trunk Sewer Rehabilitation 3
15-154 254,800254,800Oaklawn Avenue Sidewalk 3
15-162 8,750,0002,000,000 6,750,000New Water Treatment Plant 5 3
15-225 600,000200,000 200,000 200,000HRA - Promenade Phase V 3
17-063 2,371,5952,371,595Indian Trails B/C Reconstruction 3
Thursday, November 17, 2016Page 26
Total2017 2018 2019 2020 2021Category Project# Priority
17-064 711,315711,315Todd Park E/G Reconstruction 3
17-066 910,561910,561Creek Valley C Reconstruction 3
17-067 6,315,9706,315,970Morningside D/E Reconstruction 3
17-068 75,00075,000Pedestrian and Bicycle Plan Update 3
17-069 318,100318,100W 58th Street Sidewalk 3
17-070 458,000458,000Valley View Road Sidewalk 3
17-078 1,200,0001,200,000Lake Edina and South Cornelia Trunk Sewer Rehab 3
17-086 350,000350,000Well #9 Building and Process Rehab 3
17-106 120,000120,000Well #12 Rehab 3
17-107 120,000120,000Well #19 Rehab 3
17-108 90,00090,000WTP #4 Interior Painting 3
17-109 90,00090,000WTP #3 Interior Painting 3
17-159 16,00016,000Outdoor Warning Siren #4 3
15-145 2,493,0662,493,066Countryside I Neighborhood Street Reconstruction
4
15-169 220,000110,000 110,000Flood Protection & Clean Water Improvements 4
17-023 389,553389,553Interlachen Park B Reconstruction 4
17-024 891,959891,959Grandview A Reconstruction 4
17-025 2,712,4722,712,472Hilldale Reconstruction 4
17-026 3,805,2843,805,284Melody Lake A Reconstruction 4
17-065 821,818821,818Countryside C Reconstruction 4
17-071 100,000100,000Vernon Ave & Eden Ave Intersection Improvements
4
17-082 75,00075,000Sunnyslope Road Shoreline Stabilization 4
17-083 400,00050,000 75,000 75,000 100,000 100,000Pond and Outlet Maintenance Projects 4
17-084 190,000190,0002018 Flood and Drainage Improvements 4
17-085 185,00065,000 45,000 37,500 37,500Braemar Golf Course Native Area 4
15-170 167,000167,000Comprehensive Water Resource Management Plan 5
17-012 750,000750,000Vernon Avenue Intersection Improvements 5
17-014 451,000451,000Arcadia Avenue Improvements 5
17-072 364,500364,500Highway 169 Frontage Road Sidewalk 5
17-080 2,050,00050,000 1,000,000 1,000,000Watermain Rehabilitation 5
17-081 200,00025,000 150,000 10,000 10,000 5,000Arden Park Clean Water and Natural Resources 5
15-163 1,000,0001,000,000New Storage at WTP 5 6
15-164 675,00075,000 600,000Well 21 and Raw Water Line 6
17-008 100,000100,000Sidewalk at Wooddale and Valley View Ridge 6
17-009 300,000300,000W 66th St & York Ave Intersection Improvements 6
17-013 500,000500,000W 66th St & Drew Ave Intersection Improvements 6
17-015 283,000283,000New Street to Jerry's Foods from Eden Avenue 6
17-016 500,000500,000W 66th St & Barrie Ave Intersection Improvements
6
17-073 350,000350,000Vernon Ave & SB TH100 Exit Ramp Free Right Removal
6
17-074 250,000250,00050th Street and NB TH100 Entrance Ramp Free Right
6
15-189 250,00050,000 50,000 50,000 50,000 50,000Gateway Signs 7
17-010 450,00050,000 400,000York Avenue Landscaping Improvements 7
17-011 200,000200,000W 69th Street Eastbound Left Turn Lane 7
89,136,25918,242,418 22,054,102 13,804,707 16,858,335 18,176,697Infrastructure Total
Thursday, November 17, 2016Page 27
Total2017 2018 2019 2020 2021Category Project# Priority
Land
17-002 3,000,0003,000,000HRA Land Acquisition for Affordable Housing 3
3,000,0003,000,000Land Total
Parks
17-034 24,00024,000Braemar Restaurant Patio Furniture 5
17-032 25,00025,000Braemar Golf Entry Pond Fountains 6
17-035 30,00030,000Braemar Restaurant Patio Trellis 7
79,00079,000Parks Total
Technology
17-057 280,00030,000 250,000Police Dispatch Radio Console Connectivity 1
17-102 160,00080,000 80,000SCADA PLC and PanelView Upgrades 1
17-152 185,000185,000Fire Station Alerting System 1
15-183 386,600129,300 257,300GIS Infrastructure 2
17-055 20,00020,000Police CAD Workstations 2
17-056 27,50027,500Police Dispatch Audio Logging 2
17-162 28,00028,000City of Edina Firewall Agents 2
17-163 50,00050,000City of Edina Network Storage 2
17-192 120,000100,000 20,000HRIS 2
17-001 78,00078,000Grandview/50th Camera System 3
17-054 1,000,0001,000,000Police Public Safety CAD and RMS 3
17-058 27,50027,500Police Emergency Medical Dispatch Software 3
17-157 100,000100,000EOC Video/Computer Technology 4
15-011 140,000140,000Police Squad/Interview Room Video System 5
17-052 36,00036,000Police License Plate Reader (ALPR) Replacement 5
17-164 60,00060,000SWTV HD Upgrade Tightrope Cablecast System 5
15-173 175,00035,000 35,000 35,000 35,000 35,000Asset Management Software and Equipment 6
2,873,600410,500 460,000 160,500 264,300 1,578,300Technology Total
GRAND TOTAL 106,809,98023,506,640 25,425,799 16,597,767 19,034,767 22,245,007
Thursday, November 17, 2016Page 28
Capital Improvement Plan
City of Edina, MN
CIP PROJECTS BY DEPARTMENT
2017 2021thru
Total2017 2018 2019 2020 2021Department Project# Priority
Administration & HRA
15-226 67,50022,500 22,500 22,500Election Equipment Replacement 2
15-225 600,000200,000 200,000 200,000HRA - Promenade Phase V 3
17-002 3,000,0003,000,000HRA Land Acquisition for Affordable Housing 3
3,667,5003,022,500 222,500 222,500 200,000Administration & HRA Total
Administration: Liquor Stores
15-210 35,00035,000Liquor - 50th Conveyor System 3
17-001 78,00078,000Grandview/50th Camera System 3
113,00078,000 35,000Administration: Liquor Stores Total
Communications and Technology
15-182 1,642,960150,000 474,000 729,960 193,000 96,000CTS Equipment Replacement 1
15-183 386,600129,300 257,300GIS Infrastructure 2
17-162 28,00028,000City of Edina Firewall Agents 2
17-163 50,00050,000City of Edina Network Storage 2
17-164 60,00060,000SWTV HD Upgrade Tightrope Cablecast System 5
2,167,560210,000 474,000 807,960 322,300 353,300Communications and Technology Total
Community Development
15-002 375,000275,000 100,000Comprehensive Plan 1
15-003 30,00015,000 15,000Assessing Division Equipment Replacement 4
405,000275,000 115,000 15,000Community Development Total
Engineering
15-121 500,000100,000 100,000 100,000 100,000 100,000Seal Coating - Deferred Maintenance 1
15-122 1,500,000300,000 300,000 300,000 300,000 300,000Mill and Overlay - Deferred Maintenance 1
15-174 266,035266,035Chowen Park D Reconstruction 1
17-022 200,000200,00060th Street and Xerxes Ave Traffic Signal 1
15-126 1,697,2001,697,200Parklawn Avenue Reconstruction 2
15-128 2,151,008150,000 2,001,008W 62nd Street Reconstruction 2
15-138 8,558,1168,558,116Birchcrest A/Countryside B Neighborhood St Recon
2
17-019 4,033,9334,033,933West 76th Street/Edinborough Way Reconstruction 2
17-020 4,834,4164,834,416Blake Road Reconstruction 2
17-021 200,000200,000Valley View Rd Rear Yard Retaining Wall 2
17-027 1,446,2671,446,267Countryside G Reconstruction 2
17-060 914,975914,975Bredesen Park A/E Reconstruction 2
17-061 3,918,3453,918,345Concord A/G Reconstruction 2
Thursday, November 17, 2016Page 29
Total2017 2018 2019 2020 2021Department Project# Priority
17-062 167,297167,297Country Club C Reconstruction 2
17-077 820,000820,000Presidents Area Sewer Rehabilitation, Area A 2
17-079 50,00050,000Centennial Lakes I/I Repair 2
15-137 3,002,3773,002,377Normandale Park D Neighborhood Street Reconstruct
3
15-140 2,716,6352,716,635Chowen Park A Neighborhood Street Reconstruction
3
15-141 2,544,6622,544,662Chowen Park B Neighborhood Street Reconstruction
3
15-147 1,600,000600,000 1,000,000Sanitary Trunk Capacity Expansion 3
15-149 1,200,0001,200,000The Heights Trunk Sewer Rehabilitation 3
15-150 1,100,0001,100,000Minnehaha Trunk Sewer Rehabilitation 3
15-154 254,800254,800Oaklawn Avenue Sidewalk 3
15-162 8,750,0002,000,000 6,750,000New Water Treatment Plant 5 3
17-063 2,371,5952,371,595Indian Trails B/C Reconstruction 3
17-064 711,315711,315Todd Park E/G Reconstruction 3
17-066 910,561910,561Creek Valley C Reconstruction 3
17-067 6,315,9706,315,970Morningside D/E Reconstruction 3
17-068 75,00075,000Pedestrian and Bicycle Plan Update 3
17-069 318,100318,100W 58th Street Sidewalk 3
17-070 458,000458,000Valley View Road Sidewalk 3
17-078 1,200,0001,200,000Lake Edina and South Cornelia Trunk Sewer Rehab 3
15-145 2,493,0662,493,066Countryside I Neighborhood Street Reconstruction 4
15-169 220,000110,000 110,000Flood Protection & Clean Water Improvements 4
15-181 130,00028,000 75,000 27,000Engineering Equipment Replacement 4
17-023 389,553389,553Interlachen Park B Reconstruction 4
17-024 891,959891,959Grandview A Reconstruction 4
17-025 2,712,4722,712,472Hilldale Reconstruction 4
17-026 3,805,2843,805,284Melody Lake A Reconstruction 4
17-065 821,818821,818Countryside C Reconstruction 4
17-071 100,000100,000Vernon Ave & Eden Ave Intersection Improvements 4
17-082 75,00075,000Sunnyslope Road Shoreline Stabilization 4
17-083 400,00050,000 75,000 75,000 100,000 100,000Pond and Outlet Maintenance Projects 4
17-084 190,000190,0002018 Flood and Drainage Improvements 4
17-085 185,00065,000 45,000 37,500 37,500Braemar Golf Course Native Area 4
15-170 167,000167,000Comprehensive Water Resource Management Plan 5
17-012 750,000750,000Vernon Avenue Intersection Improvements 5
17-014 451,000451,000Arcadia Avenue Improvements 5
17-072 364,500364,500Highway 169 Frontage Road Sidewalk 5
17-080 2,050,00050,000 1,000,000 1,000,000Watermain Rehabilitation 5
17-081 200,00025,000 150,000 10,000 10,000 5,000Arden Park Clean Water and Natural Resources 5
15-163 1,000,0001,000,000New Storage at WTP 5 6
15-164 675,00075,000 600,000Well 21 and Raw Water Line 6
15-173 175,00035,000 35,000 35,000 35,000 35,000Asset Management Software and Equipment 6
17-008 100,000100,000Sidewalk at Wooddale and Valley View Ridge 6
17-009 300,000300,000W 66th St & York Ave Intersection Improvements 6
17-013 500,000500,000W 66th St & Drew Ave Intersection Improvements 6
17-015 283,000283,000New Street to Jerry's Foods from Eden Avenue 6
17-016 500,000500,000W 66th St & Barrie Ave Intersection Improvements 6
17-073 350,000350,000Vernon Ave & SB TH100 Exit Ramp Free Right Removal
6
17-074 250,000250,00050th Street and NB TH100 Entrance Ramp Free Right
6
Thursday, November 17, 2016Page 30
Total2017 2018 2019 2020 2021Department Project# Priority
15-189 250,00050,000 50,000 50,000 50,000 50,000Gateway Signs 7
17-010 450,00050,000 400,000York Avenue Landscaping Improvements 7
17-011 200,000200,000W 69th Street Eastbound Left Turn Lane 7
86,216,25917,430,418 21,370,102 13,236,707 16,337,335 17,841,697Engineering Total
Fire
15-196 200,000200,000Ambulance Replacement 1
17-151 22,10022,100Firefighting Personal Protective Gear Dryer 1
17-152 185,000185,000Fire Station Alerting System 1
15-204 19,00019,000Siren #9 Replacement 2
15-206 180,000180,0002012 Ambulance 2
15-227 57,00057,000Hydraulic Rescue Tools Replacement (2019) 2
15-194 40,00040,000Inspections Division Vehicle Replacement (2017) 3
15-201 70,00070,000Fire Command Staff Vehicle (2017) 3
15-203 550,000550,000Fire Engine Replacement 3
15-205 21,00021,000Inspections Division Vehicle Replacement (2018) 3
15-207 105,000105,000Fire Department Staff Vehicles Replacement 3
17-155 20,00020,000Building Inspections Staff Vehicle (2020) 3
17-159 16,00016,000Outdoor Warning Siren #4 3
17-160 14,00014,000Lucas 2 Chest Compression Device 3
17-194 60,00060,000Hydraulic Rescue Tools Replacement (2021) 3
17-154 18,00018,000Floor Scrubber 4
17-157 100,000100,000EOC Video/Computer Technology 4
17-158 40,00040,000Utility Pick-up Truck 4
17-161 900,000900,000Aerial Apparatus (Tower 90) 4
17-193 70,00070,000Fire Command Staff Vehicles (2019) 5
2,687,100132,100 975,000 145,000 356,000 1,079,000Fire Total
Human Resources
17-192 120,000100,000 20,000HRIS 2
120,000100,000 20,000Human Resources Total
Parks: Aquatic Center
15-044 160,000160,000Aquatic Center Plunge Pool Filter 3
15-045 160,000160,000Aquatic Center Zero Depth Pool Filter 3
320,000160,000 160,000Parks: Aquatic Center Total
Parks: Arena
15-072 85,00085,000Braemar Arena South Condensing Tower Replacement
1
15-086 225,000225,000Braemar Arena Roof Replacement 2
310,00085,000 225,000Parks: Arena Total
Parks: Edinborough Park
15-056 67,90067,900Edinborough Park Interior Entryway Doors 2
17-041 72,00072,000Edinborough Park Fitness Equipment Replacement 3
139,90067,900 72,000Parks: Edinborough Park Total
Thursday, November 17, 2016Page 31
Total2017 2018 2019 2020 2021Department Project# Priority
Parks: Golf Course
17-030 25,00025,000Braemar Golf Cart Storage Upgrade 2
15-060 105,00051,000 54,000Braemar Golf Fairway Mowers Replacement 4
15-061 131,00030,000 31,000 34,000 36,000Braemar Golf Greens Mowers Replacement 4
15-064 34,00034,000Braemar Golf Small Rough Mowers Replacement 4
17-034 24,00024,000Braemar Restaurant Patio Furniture 5
17-032 25,00025,000Braemar Golf Entry Pond Fountains 6
17-035 30,00030,000Braemar Restaurant Patio Trellis 7
374,000160,000 85,000 34,000 59,000 36,000Parks: Golf Course Total
Police
15-005 1,076,000288,000 136,000 194,000 338,000 120,000Police Squad Cars 1
17-049 175,000175,000ARMER Radios (Public Works) 1
17-051 21,00021,000Police AED Replacements 1
17-057 280,00030,000 250,000Police Dispatch Radio Console Connectivity 1
17-055 20,00020,000Police CAD Workstations 2
17-056 27,50027,500Police Dispatch Audio Logging 2
17-059 14,00014,000Police Glock Service Weapons 2
17-054 1,000,0001,000,000Police Public Safety CAD and RMS 3
17-058 27,50027,500Police Emergency Medical Dispatch Software 3
15-009 27,00027,000Police Squad Rifles 4
15-013 39,00039,000Police Squad Radar Units 4
15-011 140,000140,000Police Squad/Interview Room Video System 5
17-052 36,00036,000Police License Plate Reader (ALPR) Replacement 5
15-014 10,00010,000Police Radar Speed Trailer 6
2,893,000376,500 315,000 443,500 338,000 1,420,000Police Total
Public Works
15-097 500,000100,000 100,000 100,000 100,000 100,000Minor Bridge Repairs 1
15-101 120,000120,000Well #6 Rehab 1
17-102 160,00080,000 80,000SCADA PLC and PanelView Upgrades 1
17-134 50,00050,000Public Works CO and NO2 Sensor Replacement 1
15-102 120,000120,000Well #5 (West 69th St) 2
15-103 120,000120,000Well #18 Rehab 2
15-107 4,250,661674,222 709,197 1,008,100 862,132 997,010PW and Park Maintenance Equipment Replacement 2
15-108 696,00065,000 305,000 45,000 133,000 148,000Utilities Equipment Replacement 2
17-103 120,000120,000Well #7 Rehab 2
17-104 150,000150,000Well #8 Rehab 2
17-105 120,000120,000Well #11 Rehab 2
15-104 120,000120,000Well #16 Rehab 3
15-105 75,00030,000 45,000Dublin Reservoir Pump Rehab 3
17-086 350,000350,000Well #9 Building and Process Rehab 3
17-106 120,000120,000Well #12 Rehab 3
17-107 120,000120,000Well #19 Rehab 3
17-108 90,00090,000WTP #4 Interior Painting 3
17-109 90,00090,000WTP #3 Interior Painting 3
17-100 25,00025,000Blending Cabinet 4
7,396,6611,494,222 1,569,197 1,483,100 1,335,132 1,515,010Public Works Total
Thursday, November 17, 2016Page 32
Total2017 2018 2019 2020 2021Department Project# Priority
GRAND TOTAL 106,809,98023,506,640 25,425,799 16,597,767 19,034,767 22,245,007
Thursday, November 17, 2016Page 33
Capital Improvement Plan
City of Edina, MN
UNFUNDED CIP PROJECTS BY CATEGORY
2017 2021thru
Total2017 2018 2019 2020 2021Category Project# Priority
Buildings
17-047 350,000350,000Edinborough Park SE Plaza Entrance Reconstruction
2
15-073 165,000165,000Braemar Arena South Dehumidifier Replacement 3
17-007 150,000150,000Braemar Arena West Boiler 3
17-029 17,00017,000Braemar Golf Shop & Admin Carpet 3
17-036 30,00030,000Braemar Golf Pro Shop Renovation 3
17-046 33,30033,300Edinborough Park Pool Lighting System Upgrade 3
17-048 65,00065,000Edinborough Park Track Floor Replacement 3
17-111 73,60073,600City Hall Condensor Units- Compressors 3
17-112 80,00080,000City Hall UPS System 3
17-113 20,00020,000City Hall VCT Tile Flooring Renewal 3
17-117 196,525196,525City Hall Fire Alarm System 3
17-118 402,309402,309City Hall Carpeting 3
17-121 60,00060,000Danen Building Police Garage 3
17-156 18,00018,000Station 1 Floor Coating 3
17-190 250,000250,000City Hall Building Security & Efficiency 3
15-106 240,000240,000Salt Storage Facility 4
17-043 210,000210,000Edinborough Park Pool Tile Replacement 4
17-114 39,74739,747City Hall Water Heaters 4
17-115 37,86937,869City Hall Wall Finishes 4
17-122 20,00020,000Arneson Acres Furnace and Package Units 4
17-123 32,19632,196Arneson Acres Roof Replacement 4
17-124 30,68430,684Arneson Acres Door and Window Replacement 4
17-129 418,739418,739Public Works Fire Alarm System 4
17-132 204,266204,266Public Works Bldg Concrete Floor Finish 4
17-177 60,00060,000Park Shelter Buildings Roof Replacement 4
15-057 50,00050,000Braemar Golf Shop & Office Renovation 5
17-031 200,000200,000Braemar Golf Clubhouse Lower Level 5
17-045 630,000630,000Edinborough Park Locker Room Expansion 5
17-110 39,40239,402City Hall Exterior Stone Cleaning 5
17-116 43,72443,724City Hall Exit Lights 5
17-125 36,00036,000Arneson Acres Carpet Replacement 5
17-126 36,00036,000Arneson Acres Maintenance bldg. Roof Replacement
5
17-127 43,32743,327Arneson Acres Emergency Lights and Fire Alarm 5
17-128 41,59041,590Public Works Exit Sign Renewal 5
17-133 212,618212,618Public Works Security System 5
17-178 25,00025,000Shelter Buildings Flooring Replacement 5
15-049 650,000650,000Lewis Park Shelter Building Replacement 6
15-050 650,000650,000Highlands Park Shelter Building Replacement 6
15-084 35,00035,000Braemar Arena Rubber Floor Replacement 6
Thursday, November 17, 2016Page 34
Total2017 2018 2019 2020 2021Category Project# Priority
17-004 100,000100,000Centennial Lakes Remodel Pavilion Concessions Area
6
17-119 74,25574,255City Hall Vinyl Wall Paper 6
17-120 65,89365,893City Hall Ceiling and Concrete Wall Painting 6
17-130 38,43738,437Public Works Wall Finishes 6
17-131 56,62656,626Public Works Carpeting 6
17-153 30,00030,000Fire Station 1 Kitchen Cabinet Re-facing 6
17-179 80,00080,000Senior Center Flooring Replacement 6
15-047 650,000650,000Arden Park Shelter Building Replacement 7
15-048 650,000650,000Normandale Park Shelter Building Replacement 7
15-051 650,000650,000Strachauer Park Shelter Building Replacement 7
15-069 66,00066,000Edinborough Park Track Air Conditioning 7
15-082 100,000100,000Braemar Arena Bathroom/Locker Room Remodel 7
17-176 28,00028,000Pamela Park Maintenance Storage Shed 7
8,486,1071,353,702 3,472,796 963,684 1,122,276 1,573,649Buildings Total
Equipment and Vehicles
15-016 80,00080,000Police SWAT Vehicle 4
15-089 143,00068,000 75,000Braemar Golf Large Rough Mower Replacement 4
15-114 228,000228,000Anti-icing and De-icing Equipment 4
17-028 120,000120,000Braemar Arena Zamboni 4
17-033 25,00025,000Braemar Golf Landscape Lighting Replacement 4
17-039 28,00028,000Centennial Lakes Vehicle Purchase 4
15-117 330,850330,850Spray Injection Pothole Patcher 5
17-098 142,000142,000Sign Maintenance Vehicle 5
15-063 23,00023,000Braemar Golf Heavy Duty Utility Vehicle 6
17-005 28,00028,000Centennial Lakes Bobcat Skidsteer 6
17-150 23,68023,680Outdoor Message Board 6
15-119 66,10066,100Additional Skid Steer 7
15-199 325,000325,000Mobile Command Vehicle 7
17-037 50,00050,000Braemar Golf Skidsteer Replacement 7
17-099 25,00025,000New Automotive Hoist 7
1,637,630815,630 378,000 199,000 50,000 195,000Equipment and Vehicles Total
Infrastructure
17-003 740,000740,000Centennial Lakes Pedestrian Bridge Replacement 1
15-224 6,000,0006,000,000HRA - North Parking Ramp Expansion 4
17-018 2,000,00050,000 1,950,000Valley View Rd Bicycle Facility Improvements 4
17-076 1,050,0001,050,000Bridge - Wooddale Avenue Bridge Rehabilitation 4
17-191 210,00060,000 150,000Grandview Green Highway Lid-concept study 4
17-006 90,00090,000Centennial Lakes Pathway Replacement 5
17-017 2,000,00050,000 1,950,000Rosland Park/TH 62 Pedestrian Bridge Replacement
5
17-075 525,000525,000Bridge - Benton Avenue Over CP Rail 5
15-176 2,885,000150,000 2,735,000Pentagon Park - W 77th Street 6
15-178 1,675,000150,000 1,525,000Pentagon Park - Viking Drive and Computer Avenue
6
15-180 4,320,000150,000 4,170,000Pentagon Park - Green Streets 6
15-177 2,565,000150,000 2,415,000Pentagon Park - 77th Street Crossing 7
15-179 7,825,000150,000 7,675,000Pentagon Park - 76th Street 7
Thursday, November 17, 2016Page 35
Total2017 2018 2019 2020 2021Category Project# Priority
31,885,0007,550,000 18,670,000 50,000 2,615,000 3,000,000Infrastructure Total
Parks
15-068 420,000420,000Aquatic Center Zero Depth Play Structure 3
17-040 29,30029,300Edinborough Park Adventure Peak Renovation 3
17-142 47,00047,000Courtney Fields Irrigation 4
17-145 20,00020,000Garden Park Irrigation 4
17-148 175,000175,000Lewis Park Playground Replacement 4
17-180 125,000125,000Strachauer Park Playground Replacement 4
15-032 175,000175,000Wooddale Park Playground Equipment 5
15-065 525,000525,000Aquatic Center Slide Rehab & Slide Addition 5
15-083 120,000120,000Braemar Arena Lower Level Parking Lot Resurface 5
17-044 77,00077,000Braemar Golf Patio Furniture 5
17-141 250,000250,000Courtney Field Lighting Replacement 5
17-182 125,000125,000Todd Park Playground Equipment 5
17-183 34,00034,000Van Valkenburg Irrigation 5
17-184 30,00030,000Walnut Ridge Irrigation System 5
17-185 125,000125,000Walnut Ridge Park Playground Replacement 5
17-189 20,00020,000Wooddale Park Irrigiation 5
17-138 50,00050,000Arneson Acres Master Plan 6
17-139 125,000125,000Birchcrest Park Playground Replacement 6
17-143 30,00030,000Creek Valley Irrigation 6
17-144 75,00075,000Fox Meadow Park Playground Equipment 6
17-186 40,00040,000Weber Park Irrigation System 6
17-187 88,00088,000Weber Woods Dog Park Fencing & Parking Lot 6
17-188 30,00030,000Weber Woods Master Plan 6
17-136 40,00040,000Lewis Park Master Plan 7
17-137 40,00040,000Arden Park Master Plan 7
17-140 2,862,1462,862,146Braemar Winter Recreation 7
17-146 40,00040,000Highlands Park Master Plan 7
17-175 40,00040,000Normandale Park Master Plan 7
17-181 25,00025,000Strauchauer Park Master Plan 7
5,782,4463,723,146 1,619,300 290,000 110,000 40,000Parks Total
Technology
15-184 685,000100,000 60,000 265,000 170,000 90,000Citywide Fiber Optic Cabling 3
17-038 23,00023,000Braemar Golf Severe Weather Alert System 3
17-042 30,00030,000Edinborough Park Automation for Roof Top Units 3
17-050 24,15424,154Police Computer Forensic Equipment 3
17-053 883,000268,000 205,000 205,000 205,000Police Body-Worn Cameras 3
15-211 160,000105,000 55,000Electronic Document Management 4
15-185 75,00075,000City of Edina Wireless Network 5
1,880,154303,000 407,154 500,000 375,000 295,000Technology Total
GRAND TOTAL 49,671,33713,745,478 24,547,250 2,002,684 4,272,276 5,103,649
Thursday, November 17, 2016Page 36
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPer state law, update of the existing 2008 Comprehensive Plan. Cities must update their Comprehensive Plans every 10 years.
A Comprehensive Plan is a broad statement of community goals and policies that direct the orderly and coordinated physical development of a city into the future. It provides the framework for shaping future growth and change, for protecting what a community values, for enhancing what the community wants to improve, and for creating what the community feels is lacking. Elements of a Comprehensive Plan include: Vision, Goals and Objectives; Community Profile; Land Use; Housing; Heritage Preservation; Transportation; Water Resource Management; Parks, Energy & Environment; Community Services and Facilities.
ENVIRONMENTAL CONSIDERATIONS:Cut down on the amount of paper copies created. The Plan should be double sided. Encourage on-line viewing of the plan.
Project # 15-002
Priority 1 Critical
JustificationState law requires all cities to update their Comprehensive Plans every 10 years. The Plan was last updated in 2008.
Useful Life 10 years
Project Nam Comprehensive Plan
Category Infrastructure
Type Replace or repair
Contact Cary Teague
Department Community Development
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior425,000275,000 100,000Planning and Design 50,000
275,000 100,000 425,000Total 50,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
300,000200,000 100,000Construction Fund: Available Funding
125,00075,000General Fund 50,000
275,000 100,000 425,000Total 50,000
Friday, November 18, 2016Page 37
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace equipment according to the equipment replacement schedule. The assessing division currently has 3 vehicles that are part of the equipment replacement program, each with an estimated useful life of 10 years. The assessing division uses the vehicles to inspect residential property. Two of the vehicles are intended to be replaced in 2015. Two vehicles were purchased in 2005. Based on the current replacement qualification scores, it is anticipated that one Taurus would be replaced in 2018 and the other in 2020.
ENVIRONMENTAL CONSIDERATIONS:A cost analysis will be done in regard to purchasing a hybrid vehicle vs. a standard vehicle.
Project # 15-003
Priority 4
JustificationRegular updates to equipment helps to keep maintenance costs low.
Useful Life 10 years
Project Nam Assessing Division Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Bob Wilson
Department Community Development
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00015,000 15,000Vehicles and Equipment
15,000 15,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00015,000 15,000Construction Fund: Equipment Levy
15,000 15,000 30,000Total
Friday, November 18, 2016Page 38
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionScheduled replacement of marked, semi-marked and unmarked police service vehicles.8 police vehicles will be replaced in 2017.5 police vehicles will be replaced in 2018.7 police vehicles will be replaced in 2019.10 police vehicles will be replaced in 2020.4 police vehicles will be replaced in 2021.
ENVIRONMENTAL CONSIDERATIONS:Police service vehicles are limited to what the three major vehicle manufacturers produce. Several years ago Edina tested allof the pursuit rated models at the St. Cloud driving course and found that the Utility was the best police vehicle for ourneeds.The Utility was chosen for the following reasons:
-Easier to keep emergency first aid equipment at the proper temperature for correct operation (oxygen and defibrillator).-More room to carry the necessary equipment required to provide emergency services.-Vehicle sits higher for better visibility while driving in city traffic.-Better ergonomics for the patrol officer, reducing workman's compensation claims.-All-wheel drive and higher frame clearance makes it less prone to getting stuck during heavy snow events.-The center console, rear cage area and emergency lights are vehicle specific and we have outfitted our current fleet withUtilities. Changing to another vehicle model will cost thousands of dollars per vehicle.
Project # 15-005
Priority 1 Critical
JustificationPolice service vehicles are considered basic, necessary equipment needed for law enforcement and public safety functions.
Useful Life
Project Nam Police Squad Cars
Category Equipment and Vehicles
Type Replace or repair
Contact Jeff Elasky
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,076,000288,000 136,000 194,000 338,000 120,000Vehicles and Equipment
288,000 136,000 194,000 338,000 120,000 1,076,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,076,000288,000 136,000 194,000 338,000 120,000Construction Fund: Equipment Levy
288,000 136,000 194,000 338,000 120,000 1,076,000Total
Friday, November 18, 2016Page 39
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace squad rifles in accordance with expected lifespan.
ENVIRONMENTAL CONSIDERATIONS:We currently use Federal Cartridge duty ammunition. Federal is now producing a greener lead-free product for practice ammunition that we would transition to for our training qualification shoots.
Project # 15-009
Priority 4
JustificationOur current squad rifles were purchased in 2009 and are due for replacement in 2019. We intend to stay with our current AR .223 platform, eliminating the need to retrain while also saving money on ammunition.
Useful Life 10 years
Project Nam Police Squad Rifles
Category Equipment and Vehicles
Type Replace or repair
Contact Jeff Elasky
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior27,00027,000Vehicles and Equipment
27,000 27,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
27,00027,000Construction Fund: Equipment Levy
27,000 27,000Total
Friday, November 18, 2016Page 41
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace squad and interview room video system.
Project # 15-011
Priority 5 Important
JustificationOur current system was purchased in 2013 and has an expected life of five years. All patrol vehicles, the booking area and three interview rooms have video recording systems. The objective for video recording equipment and data obtained is to:a) Enhance Officer Safety.b) Accurately capture statements and events during the course of an incident.c) Enhance the officer's ability to document and review statements and actions for both internal reporting requirements and for courtroom preparation/presentation.d) Provide an impartial measurement for self-critique and field evaluation during recruitment and new officer training.e) Capture visual and audio information for use in current and future investigations.
ENVIRONMENTAL CONSIDERATIONS: There are currently no alternative options for this equipment.
Useful Life
Project Nam Police Squad/Interview Room Video System
Category Technology
Type Replace or repair
Contact Dan Conboy
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior140,000140,000Vehicles and Equipment
140,000 140,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
140,000140,000Construction Fund: Equipment Levy
140,000 140,000Total
Friday, November 18, 2016Page 42
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplacement of squad radar units in accordance with the equipment replacement schedule.
Project # 15-013
Priority 4
JustificationThe radar units are permanently mounted into patrol vehicles as a tool for traffic enforcement. They are used to measure the speed of vehicles coming and going. As the units age, they malfunction more and must be removed from the vehicles and sent to the manufacturer for repair. At a certain point it becomes more financially responsible to purchase new units than to keep repairing them. The expected life of this equipment is 8 years and our current units were purchased in 2010.
Useful Life
Project Nam Police Squad Radar Units
Category Equipment and Vehicles
Type Replace or repair
Contact Dan Conboy
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior39,00039,000Vehicles and Equipment
39,000 39,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
39,00039,000Construction Fund: Equipment Levy
39,000 39,000Total
Friday, November 18, 2016Page 43
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionScheduled replacement of Radar Speed Trailer.
ENVIRONMENTAL CONSIDERATIONS:Radar speed trailers are battery operated and not able to be used during the winter months.
Project # 15-014
Priority 6
JustificationThe radar speed trailer is used as a traffic calming device in neighborhoods throughout the City. The police department maintains a waiting list of requests for speed trailer placement. Trailer placement enhances public safety in areas of concern; however, citizens often must wait two to three weeks to have the trailer placed in a specific area.
Useful Life
Project Nam Police Radar Speed Trailer
Category Equipment and Vehicles
Type Replace or repair
Contact Jeff Elasky
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior10,00010,000Vehicles and Equipment
10,000 10,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
10,00010,000Construction Fund: Equipment Levy
10,000 10,000Total
Friday, November 18, 2016Page 44
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplacement of aging SWAT vehicle.
Project # 15-016
Priority 4
JustificationThis vehicle is used to transport SWAT officers and their specialty equipment to assist atcritical incidents. The vehicle was already 11 years old when purchased in 2009. In 2019 thevehicle will be 21 years old. The truck had originally been used as an ambulance and thepolice department had it converted for police service. The truck has worked at a basicfunctional level as a police vehicle, but a truly dedicated vehicle designed from the frame upfor police service would better serve the team. When the truck is loaded with officers and allof the necessary equipment, the truck's suspension is at capacity. The SWAT vehicle was utilized on 26 occasions in 2015. Eight critical incident operations and eighteen training exercises.
Useful Life
Project Nam Police SWAT Vehicle
Category Equipment and Vehicles
Type Replace or repair
Contact Jeff Elasky
Department Police
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior80,00080,000Vehicles and Equipment
80,000 80,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
80,00080,000Unfunded
80,000 80,000Total
Friday, November 18, 2016Page 45
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Wooddale Park.
Project # 15-032
Priority 5 Important
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Wooddale Park was installed in 1996. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Wooddale Park was ranked a priority 1. A budget of $175,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states. Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning. The current playground structure does not meet current ADA regulations.
Useful Life
Project Nam Wooddale Park Playground Equipment
Category Parks
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior175,000175,000Vehicles and Equipment
175,000 175,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
175,000175,000Unfunded
175,000 175,000Total
Friday, November 18, 2016Page 46
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace the pool filtration system in the plunge pool. The approximate useful life on a filter is 12-15 years. Proper pool filtration is essential to the operation and to keep the pool water clean and clear. It not only impacts water clarity, but the overall experience including the smell and feel of the water. In addition to the primary use of this pool for the water slides, it is also heavily used by the contractor providing swimming lessons, which provides a revenue source.
ENVIRONMENTAL CONSIDERATIONS:Although the capital cost is greater, there will be significant savings in water, electrical, chemicals, and heat. Previously had to backwash every 5 days and now we backwash every 12-15 days. Uses only a fraction of the water to accomplish backwashing task. This filtration system is a "green" technology, that is being used in all new design processes.
Project # 15-044
Priority 3 Significant
Justification The main job of the filter is to protect the pool pump from any debris that may have been sucked into the main drain or through the skimmer. If this debris were to get into the pump, it could severely damage the motor or potentially ruin the entire unit. The filters were installed in 1997 which exceeds the approximate useful life. The recommended filter is a Neptune-Benson Defender Filter. This is the same type of filter that was installed on the main pool 2015.
Useful Life
Project Nam Aquatic Center Plunge Pool Filter
Category Equipment and Vehicles
Type Replace or repair
Contact Patty McGrath
Department Parks: Aquatic Center
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior160,000160,000Vehicles and Equipment
160,000 160,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
160,000160,000Aquatic Center Fund
160,000 160,000Total
Friday, November 18, 2016Page 47
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace the pool filtration system in the zero depth pool. The approximate useful life of a filter is 12-15 years. Proper pool filtration is essential to the operation and to keep the pool water clean and clear. It not only impacts water clarity, but the overall experience including the smell and feel of the water. Due to the high volume of toddlers and preschoolers using this pool, proper pool filtration is essential for timely recovery from biohazard incidents.
ENVIRONMENTAL CONSIDERATIONS: Although the capital cost is greater, there will be significant savings in water, electrical, chemicals, and heat. Previously, backwashing had to be completed every 5 days. With the new filter backwashing will be completed every 12-15 days. The new filter uses only a fraction of the water to accomplish backwashing task. This filtration system is a "green" technology, that is being used in all new design processes.
Project # 15-045
Priority 3 Significant
JustificationThe main job of the filter is to protect the pool pump from any debris that may have been sucked into the main drain or through the skimmer. If this debris were to get into the pump, it could severely damage the motor or potentially ruin the entire unit. The filters were installed in 1997 which exceeds the approximate useful life. The recommended filter is a Neptune-Benson Defender Filter. This is the same type of filter that was installed on the main pool 2015.
Useful Life
Project Nam Aquatic Center Zero Depth Pool Filter
Category Equipment and Vehicles
Type Replace or repair
Contact Patty McGrath
Department Parks: Aquatic Center
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior160,000160,000Vehicles and Equipment
160,000 160,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
160,000160,000Aquatic Center Fund
160,000 160,000Total
Friday, November 18, 2016Page 48
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves replacement of the Arden Park shelter building with a more modern design similar to Countryside and Pamela Park.
Project # 15-047
Priority 7 Desirable
JustificationThe Arden Park shelter building was designed and build in the 1970's and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. It is often referred to as a "shack, bunker and bomb shelter" by residents in the community. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter building at Countryside and Pamela Park. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states, Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Arden Park Shelter Building Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior650,000650,000Construction
650,000 650,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
650,000650,000Unfunded
650,000 650,000Total
Friday, November 18, 2016Page 49
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves replacement of the Normandale Park shelter building with a more modern design similar to Countryside and Pamela Park.
Project # 15-048
Priority 7 Desirable
JustificationThe Normandale Park shelter building was designed and build in the 1970's and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. It is often referred to as a "shack, bunker and bomb shelter" by residents in the community. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter building at Countryside and Pamela Park. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states, Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Normandale Park Shelter Building Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior650,000650,000Construction
650,000 650,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
650,000650,000Unfunded
650,000 650,000Total
Friday, November 18, 2016Page 50
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves replacement of the Lewis Park shelter building with a more modern design similar to Countryside or the approved design for Pamela Park.
Project # 15-049
Priority 6
JustificationThe Lewis Park shelter building was designed and build in the 1970's and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. It is often referred to as a "shack, bunker and bomb shelter" by residents in the community. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter building at Countryside and Pamela Park. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states, Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Lewis Park Shelter Building Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior650,000650,000Construction
650,000 650,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
650,000650,000Unfunded
650,000 650,000Total
Friday, November 18, 2016Page 51
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves replacement of the Highlands Park shelter building with a more modern design similar to Countryside or the approved design for Pamela Park.
Project # 15-050
Priority 6
JustificationThe Highlands Park shelter building was designed and build in the 1970's and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. It is often referred to as a "shack, bunker and bomb shelter" by residents in the community. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter building at Countryside and Pamela Park. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states, Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Highlands Park Shelter Building Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior650,000650,000Construction
650,000 650,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
650,000650,000Unfunded
650,000 650,000Total
Friday, November 18, 2016Page 52
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves replacement of the Strachauer Park shelter building with a more modern design similar to Countryside or the approved design for Pamela Park.
Project # 15-051
Priority 7 Desirable
JustificationThe Strachauer Park shelter building was designed and build in the 1970's and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. It is often referred to as a "shack, bunker and bomb shelter" by residents in the community. The community has expressed an interest in having a shelter building that is more user friendly for social gatherings and meeting spaces on a year round basis, similar to the newer shelter building at Countryside and Pamela Park. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states, Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Strachauer Park Shelter Building Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior650,000650,000Construction
650,000 650,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
650,000650,000Unfunded
650,000 650,000Total
Friday, November 18, 2016Page 53
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe interior doors are the original doors installed when the park first opened in 1987. It is my recommendation to replace the interior doors on all four entrances to the park. The doors are functional, and repairs are made on them regularly, but those repairs are becoming much more costly.
ENVIRONMENTAL CONSIDERATIONS:New doors would provide energy savings.
Project # 15-056
Priority 2
JustificationThe interior doors are the first thing people see when they enter Edinborough Park. The doors are original to the park and have corroded components causing instability. New doors would be much more energy efficient. The doors are faded and do not represent the image that we want to portray to our guests. In 2017, Edinborough Park will be 30 years old. Our goal is to update the look of the facility and replacing the interior doors will help us achieve that goal. The exterior doors were replaced in 2015 and the funding source was the Environmental Efficiency fund.
Useful Life
Project Nam Edinborough Park Interior Entryway Doors
Category Buildings
Type Replace or repair
Contact Patty McGrath
Department Parks: Edinborough Park
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior67,90067,900Vehicles and Equipment
67,900 67,900Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
67,90067,900Environmental Efficiency Fund
67,900 67,900Total
Friday, November 18, 2016Page 54
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionRenovate existing Braemar Clubhouse administrative office area. The administrative office area is dated, in poor shape and has significant amounts of wasted space. The present configuration is not conducive to a productive work environment. A renovation would include office space, storage room and a conference room to be used by staff, 18 leagues and the public.
Project # 15-057
Priority 5 Important
JustificationRenovation is needed to keep facility up to acceptable standards for a premier facility.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Shop & Office Renovation
Category Buildings
Type Expand or enhance
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior50,00050,000Construction
50,000 50,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00050,000Unfunded
50,000 50,000Total
Friday, November 18, 2016Page 55
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 3 fairway mowers over the next 4 years (2017, 2018 and 2020). The trade in mowers were purchased in 2004, 2010 and 2011 making them 14, 9 and 10 years old when replaced. Braemar owns 3 of these mowers that mow the 36 fairways. As these machines age they require more maintenance and develop hydraulic oil leaks.
Project # 15-060
Priority 4
JustificationReplacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Fairway Mowers Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Swenson
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior105,00051,000 54,000Vehicles and Equipment
51,000 54,000 105,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
105,00051,000 54,000Golf Course Fund
51,000 54,000 105,000Total
Friday, November 18, 2016Page 56
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace one riding triplex greensmower from years 2017, 2018, 2020 and 2021. Braemar owns 9 of these mowers to mow the greens, roll the greens and to mow the tee box areas. The 4 trade mowers were purchased in 2005, 2008, 2008 and the final trade was purchased in 2010. At the time of purchase these mowers will be 13, 11, 13 and 12 years old respectively. These mowers are typically replaced every 10 years or less to reduce the chance of breakdowns and oil leaks. Occasionally oil leaks occur that will kill the greens.
ENVIRONMENTAL CONSIDERATIONS:Hybrid mowers are available but our demonstration mowers have been proven to be unreliable and cost $4500 more than a standard mower.
Project # 15-061
Priority 4
JustificationReplacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Greens Mowers Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Swenson
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior131,00030,000 31,000 34,000 36,000Vehicles and Equipment
30,000 31,000 34,000 36,000 131,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
131,00030,000 31,000 34,000 36,000Golf Course Fund
30,000 31,000 34,000 36,000 131,000Total
Friday, November 18, 2016Page 57
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 2 heavy duty utility vehicles at Braemar in 2019 and 2021. The trade vehicles were purchased in 2005 making them 15 and 16 years old at the time of purchase. These heavy duty vehicles are used for hauling and dumping larger loads of materials on the golf course. They are a small version of a dump truck that can maneuver around the golf course without harming the turfgrass. They typically haul sand for the bunkers, soil for construction projects and heavy debris from trees. These activities help us improve the course conditions. As these vehicles continue to age, they require more frequent repair and are not available for the grounds crew. This also reduces the time that the mechanic can spend on the grounds helping to improve course conditions.
Project # 15-063
Priority 6
JustificationReplacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Heavy Duty Utility Vehicle
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Swenson
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior23,00023,000Vehicles and Equipment
23,000 23,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
23,00023,000Unfunded
23,000 23,000Total
Friday, November 18, 2016Page 58
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace one small area rough mower in 2019. The trade was purchased in 2006 making it 14 years old at the time of purchase. This mower is typically replaced in less than 10 years because they are used daily. These mowers are capable of mowing up to 3.5 acres per hour and they are responsible for mowing the rough around the greens, tees and bunkers. They have a unique deck design that allows them to mow these sloped areas without scalping.
Project # 15-064
Priority 4
JustificationReplacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Small Rough Mowers Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Swenson
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior34,00034,000Vehicles and Equipment
34,000 34,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
34,00034,000Golf Course Fund
34,000 34,000Total
Friday, November 18, 2016Page 59
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project includes refurbishing the fiberglass of the large tube slide, the body slide, and adding a new speed slide feature to the existing slide tower. The body slide is 207-feet long and does not have a height requirement, making it very popular for both kids and adults. The 300-foot tube slide accommodates single, double or triple riders and does have a height requirement stating that riders must be at least 50" tall. The slides are original and were installed in 2002.
Both of these slides are heavily used and the fiberglass is starting to show wear and tear on the inside and outside. On the inside, the fiberglass has required patching due to fracturing and splintering. Refurbishing the slides will make them look like new, at a fraction of the cost. Adding a speed slide would bring a new thrill to our facility. The existing slide tower will accommodate a new speed slide feature, thus saving a significant amount of money. A new speed slide feature will attract new patrons and renew enthusiasm with our loyal customers. This would set our facility apart from others in the metro area.
COST CONSIDERATIONS:It is uncertain if funding will be available because it is necessary to maintain a certain balance in the Aquatic Center Fund, related to the Edina Law.
Project # 15-065
Priority 5 Important
JustificationIn 2018, the Aquatic Center will be 60 years old. Regularly updating the amenities and adding unique features has ensured the profitability of the seasonal facility. The slide is one of the Aquatic Center’s main attractions. The slide features attract people to Edina from all over the Twin Cities Metro area. It is one of the key attractions that drives daily admissions and season pass sales. The gel coating on the slides is wearing thin from heavy use. There is color deterioration and the surface is increasingly difficult to maintain. Surrounding community pools have recently replaced their slide features and ours appears very outdated. As our admission prices continue to increase, it is important that we continue to update our amenities.
Replacing the slide in 2018:-Will keep us competitive with other outdoor pool facilities.-Create excitement in the community to come to the pool to use the improved slide.-Will keep the quality standards that are expected from an Edina facility.
Using the existing slide tower, will save a significant amount of money and will accommodate a new speed slide feature that would attract new patrons and renew enthusiasm with our loyal customers.
Useful Life
Project Nam Aquatic Center Slide Rehab & Slide Addition
Category Parks
Type Expand or enhance
Contact Patty McGrath
Department Parks: Aquatic Center
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior525,000525,000Vehicles and Equipment
525,000 525,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
525,000525,000Unfunded
525,000 525,000Total
Friday, November 18, 2016Page 60
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace the toddler play structure located in the zero depth pool. The play structure was installed in 1997 and is a heavily used attraction. This play structure has several components including tunnel slides, tires swings, and spray fountains that are specifically designed for children 8 years old and younger. This play area provides an age appropriate introduction to the Aquatic Center and allows families with young children to spend quality time together at the pool.
The cost of the project has changed since it's initial proposal due to increased costs of the play structure itself.
COST CONSIDERATIONS:Funding is uncertain because it is necessary to maintain a certain balance in the Aquatic Center Fund, related to the Edina Law.
Project # 15-068
Priority 3 Significant
JustificationPreventative maintenance has helped increased the longevity of the play structure, however it needs to be replaced. The life expectancy of an outdoor play structure is approximately 20 years and this structure was installed in 1997. Other communities are installing newer play structures and our is showing wear and tear. Adding a unique play structure will set the Aquatic Center apart from other outdoor water parks.
The zero depth play structure is one of the Aquatic Center's main attractions. This play structure is a critical component of the facility because it provides a dedicated and secure amenity for families with small children. This feature is also provides and introduction to our facility for young families who continue purchasing season passes for years to come, as their children get older and are able to use other features.
Useful Life
Project Nam Aquatic Center Zero Depth Play Structure
Category Parks
Type Replace or repair
Contact Patty McGrath
Department Parks: Aquatic Center
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior65,00065,000Planning and Design
355,000355,000Construction
420,000 420,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
420,000420,000Unfunded
420,000 420,000Total
Friday, November 18, 2016Page 62
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis was submitted as a 2016 CIP, however it was unfunded.
Add air conditioning to the track and exercise area. The useful life is anticipated to be 10 years. Adding air conditioning to the track area is vital to the keeping the exercise area relevant and attractive to our Association Partners (ie: Corporate Center, Brookdale Senior Living, Residence Inn and Edinborough Townhome owners), Pool & Track members and daily users.
Project # 15-069
Priority 7 Desirable
JustificationCurrently, there is no air conditioning in the track area. The track is surrounded by windows that cannot be opened. During the summer months temperatures can exceed 90 degrees. Exercising at these temperatures can become a safety and health issue for anyone, especially seniors. Air conditioning in an exercise area is a basic expectation of anyone working out indoors. The addition of air conditioning to the track will make the facility a more appealing alternative for the community to enjoy year round.
Useful Life
Project Nam Edinborough Park Track Air Conditioning
Category Buildings
Type New
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior66,00066,000Vehicles and Equipment
66,000 66,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
66,00066,000Unfunded
66,000 66,000Total
Friday, November 18, 2016Page 63
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Braemar South Arena Condensing Unit is nearing the date for replacement. Typical life expectancy is 15-20 years for this type of equipment. The Condensing Unit is one of main components of the south arena refrigeration system. The refrigerant is circulated through the coil of the evaporative condenser. Heat from the refrigerant is dissipated through the coil tubes to the water cascading downward over the tubes. Simultaneously, air is drawn in through the air inlet louvers at the base of the condenser and travels upward over the coil opposite the water flow. A small portion of the water is evaporated which removes the heat. The warm moist air is drawn to the top of the evaporative condenser by the fan and is discharged to the atmosphere. We would like to replace it with a BAC unit. Model number VC2 N191. Currently there is a small leak which we have been patching, however there is still a small loss of water.
ENVIRONMENTAL CONSIDERATIONS:A new system would have increased energy efficiencies.
Project # 15-072
Priority 1 Critical
JustificationThere is currently a small leak that staff have been patching. In the late fall of 2016, there was a plan to hire a contractor to put a semi permanent patch on the system when it is cold enough to shut down the water to the system. The contractor felt confident that we could get one full "water" season, but uncertain about too much longer. There is a significant amount of mechanical equipment at Braemar Arena. If the condensing tower were to go down, South Arena ice would be lost for 2-3 months, inconveniencing customers and costing the Arena well over $75,000 in ice rental.
Useful Life
Project Nam Braemar Arena South Condensing Tower Replacement
Category Buildings
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior85,00085,000Construction
85,000 85,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
85,00085,000Construction Fund: Available Funding
85,000 85,000Total
Friday, November 18, 2016Page 64
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe existing unit was installed in 1997. In 2019 this piece of equipment will be beyond its 15-20 year expected life. The Dehumidifier is an essential piece of equipment in an ice arena environment as the moist environment causes extreme humidity issues if not working properly. The existing dehumidifier does not take advantage of the waste heat and is not nearly as environmentally friendly as the East and West unit that was installed in 2010. The proposed system would also provide a heat source in addition to the inefficient radiant heaters that currently exist.
ENVIRONMENTAL CONSIDERATIONS:This system will be more energy efficient and will provide a heating source as the existing radiant heating is inefficient due to location to high from the seating area.
Project # 15-073
Priority 3 Significant
JustificationIf a dehumidifier were in need of emergency replacement in the summer months it would be difficult to operate for a long period of time. If a dehumidifier is not working properly we will know immediately due to the musty smell that is noticed. We would need to run fans from other facilities to clear the air as much as possible and we would need to turn on the radiant heaters 24/7 which would cost up to $10,000 per month.
Useful Life
Project Nam Braemar Arena South Dehumidifier Replacement
Category Buildings
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior165,000165,000Construction
165,000 165,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
165,000165,000Unfunded
165,000 165,000Total
Friday, November 18, 2016Page 65
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionMany of the bathrooms/locker rooms in Braemar Arena are outdated. They receive significant use on a daily basis and are in need of upgrades and improvements. The project will include re-tiling, new partitions, counter tops, and mirrors. The floors in our lower level bathrooms are rubber and are difficult to clean. Tiling the floors with skate safe rubber matting would be best and would be compliant with health codes.
As the facility ages, it is important for us to continue to improve the Arena. Currently the upper West, lower West and lower South are all in need of improvements. The West 1 and West 2 locker rooms are also in need of significant improvements. The West 1 & 2 locker rooms are used by our Edina Hockey Association members, our adult league participants and our visiting high school hockey teams. All rest room and locker room facilities are very visible to our users and we need to continue to invest in the improvement of our facilities.
Project # 15-082
Priority 7 Desirable
JustificationThis is a project that is more for aesthetics than functionality, however the West locker room restrooms are not ADA compliant and are in very poor condition. Over the past five years we have improved the quality by significantly cleaning them each night, however we are only delaying the inevitable. This definitely does not provide the Edina quality our customers expect.
Useful Life
Project Nam Braemar Arena Bathroom/Locker Room Remodel
Category Buildings
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Construction
100,000 100,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
100,000100,000Unfunded
100,000 100,000Total
Friday, November 18, 2016Page 66
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionResurface the lower level parking lot near the south arena. The parking lot was installed in 1997 and has not been resurfaced. The City of Edina engineering department has recommended resurfacing the lot to avoid more significant repairs in the future. The main lot was resurfaced in 2011. This project was listed on the 2013 CIP but never completed. The amount that was included in the 2013 CIP was incorrect so was delayed and a revised quote shows the actual cost at $120,000.
Project # 15-083
Priority 5 Important
JustificationBraemar Arena often holds events that will fill every parking space on the property and spill over parking on streets and neighboring lots. The lower level parking lot is in need of repair. As a storage space for construction materials it has taken an additional beating and as stated previously was initially recommended for replacement by our engineering department in 2013. There are different areas that have been temporarily repaired which causes additional risk of falls due to the different surfaces.
Useful Life
Project Nam Braemar Arena Lower Level Parking Lot Resurface
Category Parks
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Construction
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Unfunded
120,000 120,000Total
Friday, November 18, 2016Page 67
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe East and South Arenas need new Rubber Flooring. The replacement would be in the main areas- lower tunnel corridors, locker rooms and players benches/penalty boxes. The rubber floor allows for players to walk throughout the lower level of the facility with their skates on. The rubber flooring throughout the South and East Arenas was installed in 1997. Previously the East Arena only lasted for 10 years and currently the flooring is 19 years old. The flooring for the West arena and locker rooms was replaced in 2010. The flooring is wearing out in high traffic areas and becomes difficult to clean with our floor scrubber.
Project # 15-084
Priority 6
JustificationThe restrooms inside of the locker rooms that had rubber flooring installed are currently not up to code as rubber is difficult to clean. This product should not have been allowed to be installed this way in 1997. We are currently patching spots that have worn through, the patched spots create a trip hazard as the patching raises the flooring. The recommendation is to replace the rubber flooring with tile that does align with city code.
Useful Life
Project Nam Braemar Arena Rubber Floor Replacement
Category Buildings
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior35,00035,000Construction
35,000 35,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
35,00035,000Unfunded
35,000 35,000Total
Friday, November 18, 2016Page 68
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe current roof was installed in 1996. It is a rubber membrane with rock roof material. In 2012 we invested $5000 to repair certain areas and this was to delay complete replacement by 5 years. The project was not funded for 2016 and would be difficult to delay much longer. We currently have a leak in a few areas that require buckets and and safety signs upon significant down pours. The proposal is to replace the roof over the main lobby, South Arena, and the East lobby. It has been recommended to replace the roof with a rubber membrane and rock material. Since the existing roof was installed in 1997 there have been significant improvements in the product and was this was recommended by two sources.
Project # 15-086
Priority 2
JustificationDelaying this project any longer would create even more safety issues inside the arena where there are existing leaks. The existing product has a life expectancy of 15-20 years. We have already invested $5,000 to extend the life. If this project is delayed we would need to invest in additional "patchwork".
Useful Life
Project Nam Braemar Arena Roof Replacement
Category Buildings
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior225,000225,000Construction
225,000 225,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
225,000225,000Construction Fund: Available Funding
225,000 225,000Total
Friday, November 18, 2016Page 69
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace two large area rough mowers that are capable of mowing up to 6.5 acres per hour. The first trade in mower was purchased in 2014 making it 6 years old in 2019. The second trade mower was purchased in 2016 making it 6 years old in 2021. These rough mowers are used daily to mow the large areas of taller grass at the golf course. This improves the golfers experience by making the grass shorter and easier to play. Customers feedback shows that long rough slows down play and makes golf too difficult. This mower has a unique deck design that uses a roller to stripe the grass and doesn't scalp on uneven terrain.
Project # 15-089
Priority 4
JustificationReplacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Large Rough Mower Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Swenson
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior143,00068,000 75,000Vehicles and Equipment
68,000 75,000 143,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
68,00068,000Golf Course Fund
75,00075,000Unfunded
68,000 75,000 143,000Total
Friday, November 18, 2016Page 70
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe intent of this funding is to provide additional revenue for bridge rehab and repairs otherthen the funds currently available in the general fund under bridge repairs (program 1343)There is $11,500 in the budget for 2016.
Project # 15-097
Priority 1 Critical
JustificationThe city receives an annual bridge report from our certified consultant on 26 bridges in town. This report indicates the need for a more aggressive preventative maintenance program to extend the useful life of these structures. Although most of these bridges are on State Aid Routes. State aid funding is generally used for total reconstruction. Maintaining a sound infrastructure is in our mission statement and a sound bridge infrastructure is critical to the safety and quality of life of its residents. Our Vision Edina mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Minor Bridge Repairs
Category Infrastructure
Type Replace or repair
Contact Brian Olson
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior500,000100,000 100,000 100,000 100,000 100,000Construction
100,000 100,000 100,000 100,000 100,000 500,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
500,000100,000 100,000 100,000 100,000 100,000General Fund
100,000 100,000 100,000 100,000 100,000 500,000Total
Friday, November 18, 2016Page 71
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well # 6 by repairing or replacing the wellpump, motor, and other worn equipment.
ENVIRONMENTAL CONSIDERATIONMotor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 15-101
Priority 1 Critical
JustificationAs outlined in Vision Edina, it is the mission of the City Council to provide effective andvalued City services. Specifically, the Comprehensive Plan identifies a goal to Provide theCity’s water customers with safe, reliable, high quality potable water supply. In order toprovide a reliable, sound infrastructure, the Public Works Department has implemented a 7year rehabilitation schedule for each of its municipal water wells. This fits into that work planas it was last rehabilitated in 2007. This is a well that runs year round.
Useful Life
Project Nam Well #6 Rehab
Category Infrastructure
Type Replace or repair
Contact Brian Olson
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Construction
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 72
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well # 5 by repairing or replacing the wellpump, motor, and other worn equipment. It also includes converting the existing well pumpto a submersible pump and removal of the building that is in the median of West 69th Streetafter it is hooked up to the new water treatment facility. The timing of this work has beenpushed back so that it coincides with new water treatment facility in the Southdale area.
Project # 15-102
Priority 2
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. This fits into that work plan as it was last rehabilitated in 2002.
Useful Life
Project Nam Well #5 (West 69th St)
Category Infrastructure
Type Replace or repair
Contact Brian Olson
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Construction
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 73
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionRehabilitation of Well #18 by repairing or replacing the well pump, motor and other worn equipment. Well #18 will transition from a seasonal well to year around use upon completion of WTP #5 in 2018.
ENVIRONMENTAL CONSIDERATIONS:Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency.
Project # 15-103
Priority 2
JustificationAs outlined in Vision 20/20, the mission of the City Council is to provide effective and valued City services. The Comprehensive Plan identifies the goal to provide the City's water customers with a safe, reliable, high quality potable water supply. In order to provide a reliable and sound infrastructure, seasonal wells are on a 15 year rehabilitation schedule , year around wells every 5-7 years. Well #18 was last rehabbed in 2002.
Useful Life
Project Nam Well #18 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Construction
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 74
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionRehabilitation of Well #16 by repairing or replacing the well pump, motor and other wornequipment.
ENVIRONMENTAL CONSIDERATIONS:Motor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 15-104
Priority 3 Significant
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. Year around wells every 5-7 years. Well #16 was last rehabbed in 2004.
Useful Life
Project Nam Well #16 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Construction
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 75
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionRoutine rehab/replacement of (two) 200 HP High Service Pumps at 4 MG Storage Facility #1.
ENVIRONMENTAL CONSIDERATIONS:Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency.
Project # 15-105
Priority 3 Significant
Justification
Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply.
Project aligns with Edina IQS:Integrity: Wisely use all City's resources, including money, equipment and time.Quality: Provide the best long-term value for our residents; and continuously improve ouroperations.
Useful Life
Project Nam Dublin Reservoir Pump Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior75,00030,000 45,000Construction
30,000 45,000 75,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
75,00030,000 45,000Utility Fund: Water
30,000 45,000 75,000Total
Friday, November 18, 2016Page 76
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis would be an offsite storage structure at the Braemar Cold Storage site. It would hold up to 5,000 ton. Our current storage capacity is 2,000 tons and our annual order of salt for the year is nearly 3,000 tons. A meeting with a contractor that does construct these buildings verified that it would work on this site.
Each year, we are required to order our salt for the upcoming season in May and the contract is from June 1- May 31. For the past 2 years there has been crisis on both fronts - supply and demand. In the 2012-2013 snow season, we did not have enough storage facility to accept all of our salt that we had ordered. We discussed this with neighboring communities and were told that we could store at their facility but only with a fee to rent an elevator. In the 2013-2014 snow season, we could not get enough salt due to the weather and the absence of salt in the region. We nearly ran out of salt and had to change our operation to mix salt and sand to get through the winter.
ENVIRONMENTAL CONSIDERATIONS:This would be a very safe, and workable salt storage. Putting the salt in a covered structure and controlled drainage is vital to a cities excess salt.
Project # 15-106
Priority 4
JustificationThis would show initiative and strive to improve our operations. Allowing us to not be so dependent on others when weather and conditions dictate this across the region. We need to have this control with our own future when it comes to the level of service we need to provide for our residents. The winter of 2013-2014 proved to the staff at the City of Edina that we do need to have a stockpile of salt. This is vital to our service commitment to our residents. Allowing us to also save many budget dollars by being able to carry salt from a mild year into the next very easily and comfortably.
The City of Edina was one of the first cities in the State of Minnesota to be certified as a MPCA Level 2 Certified Organization in terms of salt best management practices. One of the things that we could improve upon is that our current practice of loading and unloading salt outdoors. This facility would allow for salt loading and unloading to be done internally, away from the precipitation and would decrease the runoff of salt into the storm sewer system.
Useful Life
Project Nam Salt Storage Facility
Category Buildings
Type New
Contact Shawn Anderson
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior240,000240,000Construction
240,000 240,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
240,000240,000Unfunded
240,000 240,000Total
Friday, November 18, 2016Page 77
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace equipment according to the equipment replacement schedule. The Public Works and Parks maintenance Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years.
We have stretched the lifespan of the equipment to its maximum and expect to see an increase in maintenance costs and most importantly delays caused by unreliable equipment. In 2017-2021 we will see the completion of our entire replacement of our sidewalk snow removal equipment and the beginning of our end loader replacements.
It should be noted that the Parks maintenance division is still included on this list.
ENVIRONMENTAL CONSIDERATIONS:As a fleet operation, we strive to buy the tools we need to get the job done in an efficientmanner. The quicker we complete the job, the less miles that we travel on the street therebyreducing the amount of fuel consumed. It should also be noted that there is a federal mandate to comply with new emission reduction standards. Whereas this is significantly raising the cost of our replacement, it is being completed on a national level and will increase fuel efficiency and reduce greenhouse gases.
Project # 15-107
Priority 2
JustificationAs outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet.
Useful Life
Project Nam PW and Park Maintenance Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Brian Olson
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior4,250,661674,222 709,197 1,008,100 862,132 997,010Vehicles and Equipment
674,222 709,197 1,008,100 862,132 997,010 4,250,661Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
4,250,661674,222 709,197 1,008,100 862,132 997,010Construction Fund: Equipment Levy
674,222 709,197 1,008,100 862,132 997,010 4,250,661Total
Friday, November 18, 2016Page 79
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project includes normal replacement of vehicles that are part of the utilities divisionfleet.
ENVIRONMENTAL CONSIDERATIONS:As a fleet operation, we strive to buy the tools we need to get the job done in an efficientmanner. The quicker we complete the job, the less miles that we travel on the street therebyreducing the amount of fuel consumed. It should also be noted that there is a federal mandate to comply with new emission reduction standards. Whereas this is significantly raising the cost of our replacement, it is being completed on a national level and will increase fuel efficiency and reduce greenhouse gases.
Project # 15-108
Priority 2
JustificationAs outlined in Vision 20/20, it is the mission of the City Council to provide effective andvalued City services. We cannot perform the functions of a Public Works Department withouta reliable fleet. Vehicles are replaced on a minimum of a 10 year schedule and vehicles have reached their life expectancy. This includes a fleet vehicles (trucks), a street sweeper in 2018, replacement of a 1989 generator in 2019 and backhoe replacement in 2020.
Useful Life
Project Nam Utilities Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Brian Olson
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior696,00065,000 305,000 45,000 133,000 148,000Vehicles and Equipment
65,000 305,000 45,000 133,000 148,000 696,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
207,50025,000 25,000 17,000 66,500 74,000Utility Fund: Sewer
295,00040,000 255,000Utility Fund: Storm
193,50025,000 28,000 66,500 74,000Utility Fund: Water
65,000 305,000 45,000 133,000 148,000 696,000Total
Friday, November 18, 2016Page 81
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a tandem truck with a anti-icing tank, with all the hardware and hydraulics to run this unit. Now the city has a full anti-icing system that can support the entire roadway system in an oncoming snow event. The anti-icing truck is also a plow truck that has to be changed back to snow fighting mode just before the storm hits. This is usually the best time for anti-icing. Which limits greatly our ability to utilize the system we just installed last year. This truck and tank will allow the city to anti-ice right up until the snow starts accumulating on the roadways. Which in turn will help greatly in clearing the roadways after the snow has stopped falling.
ENVIRONMENTAL CONSIDERATIONS:This CIP request will help provide effective public services by getting our roadways safer in the winter. Also it is a very economical investment, due to the raising price of salt and the effects of chlorides in our waterways. Any way to provide great service and work on using less of the damaging chlorides in our city is always a plus.
Project # 15-114
Priority 4
JustificationThis CIP request will help provide effective public services by getting our roadways safer in the winter. Also it is a very economical investment, due to the raising price of salt and the effects of chlorides in our waterways. Any way to provide great service and work on using less of the damaging chlorides in our city is always a plus.
Useful Life
Project Nam Anti-icing and De-icing Equipment
Category Equipment and Vehicles
Type Replace or repair
Contact Shawn Anderson
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior228,000228,000Vehicles and Equipment
228,000 228,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
228,000228,000Unfunded
228,000 228,000Total
Friday, November 18, 2016Page 82
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis would be an additional pothole patcher. It would accompany the one that we have in our fleet. I would also request a portable oil tanker to help the efficiency of both machines. With the number of potholes each year in the city this would help us to stay on top of the task of filling them. Making our residents notice that we are on top of the problems that effect every city in MN. The spray injection patcher does a better job of patching potholes year round, due to the fact that it stays in the problem area better than just hot mix thrown into it. Also with the portable tanker we would be able to do more permanent patches earlier in the spring, and later in the fall when hot mix is not available or not a good option.
ENVIRONMENTAL CONSIDERATIONS: This type of pothole patching is much more efficient and longer lasting. Making less of an impact and many trips to the same area to continually keep patching the same pothole.
Project # 15-117
Priority 5 Important
JustificationThis CIP request will enhance our ability to strive for a sound public infrastructure. When it is necessary to patch the streets from harsh winters. This unit will allow more efficiency by cutting labor in half and providing a patch that lasts longer then regular products, this will help us get the streets back to a safe condition faster and more efficiently then normal patch methods.
Useful Life
Project Nam Spray Injection Pothole Patcher
Category Equipment and Vehicles
Type New
Contact Shawn Anderson
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior330,850330,850Vehicles and Equipment
330,850 330,850Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
330,850330,850Unfunded
330,850 330,850Total
Friday, November 18, 2016Page 83
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis piece of equipment would help us in the cleaning of City hall parking lot and the ramps downtown. As well as working on all snow removal and plowing throughout the city. This would also be used in the summer for both the asphalt crew and the concrete crew for digging out the work in the streets. A tracked machine is greatly needed in this department and will be utilized all year long. ENVIRONMENTAL CONSIDERATIONS:This piece of equipment would be a helpful addition for snow removal. In turn making things better and more efficient.
Project # 15-119
Priority 7 Desirable
JustificationThe street division is looking for an additional skid steer with snow fighting attachments. This skid steer will help with city hall, and working in the Southdale area removing snow from pedestrian crossings. The attachments would be a snow plow with pusher, and a blower. This would be a great addition to the fleet, due to the fact that we are always short handed when it comes to this piece of equipment. When one of the existing skid steers go down for repairs it does affect our snow fighting capabilities. This piece of equipment will allow us to better snow fight and clean up pedestrian crossings in the city. The blower and the plow we are asking for will be utilized all over town to make our snow fighting more efficient and continue to get better and safer for our residents.
Useful Life
Project Nam Additional Skid Steer
Category Equipment and Vehicles
Type New
Contact Shawn Anderson
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior66,10066,100Vehicles and Equipment
66,100 66,100Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
66,10066,100Unfunded
66,100 66,100Total
Friday, November 18, 2016Page 84
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will provide a protective seal coat for neighborhood reconstruction projects completed between 1998 and 2011 to protect the significant investment in new roads and extend pavement life.
This CIP item proposes to catch up on deferred maintenance of pavements and extend theusable life, delaying the need for more expensive maintenance strategies (full-depth mill and overlay or complete reconstruction). The goal is to utilize resources efficiently by performing infrastructure renewal that will provide the greatest service life for the lowest cost.
ENVIRONMENTAL CONSIDERATIONS:The Proactive Pavement Management Program seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespanincrease for the lowest cost.
COST CONSIDERATIONS:Proactive maintenance of bituminous pavement surfaces can extend the life of the pavements from 20-30 years to approximately 50-60 years.
Project # 15-121
Priority 1 Critical
JustificationStreets, utilities, parks, and public buildings are the essential components of the foundation of our city. A sound public infrastructure encourages the development of a stable private infrastructure and preserves and enhances community quality of life.
This project supports the Vision Edina's the "inclusive and connected" feature that defines our community: Our residents enjoy a wide range of transportation options that foster mobility and interconnectedness.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Useful Life
Project Nam Seal Coating - Deferred Maintenance
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior500,000100,000 100,000 100,000 100,000 100,000Construction
100,000 100,000 100,000 100,000 100,000 500,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
500,000100,000 100,000 100,000 100,000 100,000General Fund
100,000 100,000 100,000 100,000 100,000 500,000Total
Friday, November 18, 2016Page 85
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will provide a new wearing surface for neighborhood reconstruction projects completed between 1998 and 2006 to protect the significant investment in new roads and extend pavement life.
This CIP item proposes to catch up on deferred maintenance of pavements and extend theusable life, delaying the need for more expensive maintenance strategies (full-depth mill and overlay or complete reconstruction). The goal is to utilize resources efficiently by performing infrastructure renewal that will provide the greatest service life for the lowest cost.
ENVIRONMENTAL CONSIDERATIONS:This project will provide a new wearing surface for neighborhood reconstruction projects completed between 1998 and 2006 to protect the significant investment in new roads and extend pavement life.
This CIP item proposes to catch up on deferred maintenance of pavements and extend theusable life, delaying the need for more expensive maintenance strategies (full-depth mill and overlay or complete reconstruction). The goal is to utilize resources efficiently by performing infrastructure renewal that will provide the greatest service life for the lowest cost.
COST CONSIDERATIONS:Proactive maintenance of bituminous pavement surfaces can extend the life of the pavements from 20-30 years to approximately 50-60 years. Funding this entirely will be difficult, but any amount funding will increase of level of service.
Project # 15-122
Priority 1 Critical
JustificationStreets, utilities, parks, and public buildings are the essential components of the foundation of our city. A sound public infrastructure encourages the development of a stable private infrastructure and preserves and enhances community quality of life.
This project supports the Vision Edina's the "inclusive and connected" feature that defines our community: Our residents enjoy a wide range of transportation options that foster mobility and interconnectedness. The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
Useful Life
Project Nam Mill and Overlay - Deferred Maintenance
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,500,000300,000 300,000 300,000 300,000 300,000Construction
300,000 300,000 300,000 300,000 300,000 1,500,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,500,000300,000 300,000 300,000 300,000 300,000General Fund
300,000 300,000 300,000 300,000 300,000 1,500,000Total
Friday, November 18, 2016Page 87
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction of Municipal State Aid designated Parklawn Avenue from West 76th Street to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian and traffic facility improvements. The project will meet current State Aid requirements.
This project will also incorporate a portion of the Nine Mile Creek Regional Trail.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-126
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Parklawn Avenue Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,697,2001,697,200Construction
1,697,200 1,697,200Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
800,000800,000Construction Fund: Municipal State Aid
Friday, November 18, 2016Page 89
Capital Improvement Plan
City of Edina, MN
2017 2021thru
200,000200,000Construction Fund: Special Assessments
34,20034,200PACS Fund: Utility Franchise Fees
106,800106,800Utility Fund: Sewer
284,400284,400Utility Fund: Storm
271,800271,800Utility Fund: Water
1,697,200 1,697,200Total
Friday, November 18, 2016Page 90
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction of Municipal State Aid designated W 62nd Street from Valley View Road to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian and traffic facility improvements. The project will meet current State Aid requirements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-128
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam W 62nd Street Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Planning and Design
2,001,0082,001,008Construction
150,000 2,001,008 2,151,008Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,349,596150,000 1,199,596Construction Fund: Municipal State Aid
Friday, November 18, 2016Page 91
Capital Improvement Plan
City of Edina, MN
2017 2021thru
299,899299,899Construction Fund: Special Assessments
22,17322,173PACS Fund: Utility Franchise Fees
120,000120,000Utility Fund: Sewer
183,732183,732Utility Fund: Storm
175,608175,608Utility Fund: Water
150,000 2,001,008 2,151,008Total
Friday, November 18, 2016Page 92
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Creek Drive, Doron Drive, Doron Lane, Limerick Circle, Limerick Drive, Limerick Lane, and 64th Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
This project will also study options for increasing the capacity of the regional storm sewer system between this neighborhood and the Birchcrest A / Countryside B Project also scheduled for 2017.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-137
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue to improve the aging infrastructure of the City."
The recommended scheduling is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Normandale Park D Neighborhood Street Reconstruct
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
Friday, November 18, 2016Page 93
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior3,002,3773,002,377Construction
3,002,377 3,002,377Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,151,6421,151,642Construction Fund: Special Assessments
432,212432,212Utility Fund: Sewer
658,113658,113Utility Fund: Storm
760,410760,410Utility Fund: Water
3,002,377 3,002,377Total
Friday, November 18, 2016Page 94
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Birchcrest Drive, Code Avenue, Colonial Court, Darcy Lane, Forslin Drive, Maddox Lane, Mildred Avenue, Porter Lane, W 60th Street, W 61st Street, W 62nd Street, and Wyman Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
This project will also study options for increasing the capacity of the regional storm sewer system between this neighborhood and the Normandale Park D Project also scheduled for 2018.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-138
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Birchcrest A/Countryside B Neighborhood St Recon
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior8,558,1168,558,116Construction
8,558,116 8,558,116Total
Friday, November 18, 2016Page 95
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
3,177,1013,177,101Construction Fund: Special Assessments
392,175392,175PACS Fund: Utility Franchise Fees
1,271,8461,271,846Utility Fund: Sewer
2,053,0132,053,013Utility Fund: Storm
1,663,9811,663,981Utility Fund: Water
8,558,116 8,558,116Total
Friday, November 18, 2016Page 96
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Abbott Avenue, Beard Avenue, W 59th Street, York Avenue, and Zenith Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-140
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Chowen Park A Neighborhood Street Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,716,6352,716,635Construction
2,716,635 2,716,635Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,289,6301,289,630Construction Fund: Special Assessments
262,740262,740Utility Fund: Sewer
Friday, November 18, 2016Page 97
Capital Improvement Plan
City of Edina, MN
2017 2021thru
834,005834,005Utility Fund: Storm
330,260330,260Utility Fund: Water
2,716,635 2,716,635Total
Friday, November 18, 2016Page 98
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Chowen Avenue,Drew Avenue, and Ewing Avenue) within the project area. This includes replacing the entirepavement surface, repair/replacement of curb and gutter, and upgrading public utilities(watermain, sanitary sewer, and storm sewer). The project may also include installation ofsump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facilityimprovements.
It will also begin to address the storm water issue identified in the STS-406 Storm Water Report from 2014.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-141
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Chowen Park B Neighborhood Street Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,544,6622,544,662Construction
2,544,662 2,544,662Total
Friday, November 18, 2016Page 99
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
777,888777,888Construction Fund: Special Assessments
76,02476,024PACS Fund: Utility Franchise Fees
158,481158,481Utility Fund: Sewer
1,333,0611,333,061Utility Fund: Storm
199,208199,208Utility Fund: Water
2,544,662 2,544,662Total
Friday, November 18, 2016Page 100
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Arbour Avenue, Arbour Lane, Jeff Place, and W 61st Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 15-145
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Countryside I Neighborhood Street Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,493,0662,493,066Construction
2,493,066 2,493,066Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,183,4981,183,498Construction Fund: Special Assessments
241,118241,118Utility Fund: Sewer
Friday, November 18, 2016Page 101
Capital Improvement Plan
City of Edina, MN
2017 2021thru
765,370765,370Utility Fund: Storm
303,080303,080Utility Fund: Water
2,493,066 2,493,066Total
Friday, November 18, 2016Page 102
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe SE part of Edina continues to increase in development density which in turn puts additional pressure on our sanitary sewer system. A model with various development densities was created to determine which parts of the system will be most impacted by development. This project will meet increasing sewer capacity needs at areas of most risk. The 2017 Phase includes improvement of a flow meter and capacity increases near 75th and Xerxes Ave. The 2019 Phase will continue to address the areas of most risk in SE Edina.
ENVIRONMENTAL CONSIDERATIONS:Sanitary lift stations use electricity which have an ongoing energy cost. In 2016 this project could produce alternatives that weigh the cost/benefit of options with and without new lift stations.
Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations.
COST CONSIDERATIONS:This project qualifies for potential TIF/HRA funding. If Southdale TIF generates additional revenue, in its closing years, funding could be directed to this project.
Project # 15-147
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Sanitary Trunk Capacity Expansion
Category Infrastructure
Type Expand or enhance
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior406,00090,000 150,000Planning and Design 166,000
1,360,000510,000 850,000Construction
600,000 1,000,000 1,766,000Total 166,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,600,000600,000 1,000,000Utility Fund: Sewer
600,000 1,000,000 1,600,000Total
Friday, November 18, 2016Page 103
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project is described as project areas 13 and 15 in the Trunk Sanitary Sewer Infiltration Study Report (December 2013). This project proposes to: 1) Line project area 13, from MH 3526 to MH 2993, 2) Line project area 15 from MH 5144 to MH 2478, 3) Investigate, recommend and improve manhole, ring and castings in project areas 13 and 15.
ENVIRONMENTAL CONSIDERATIONS:Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations.
Efforts to reduce infiltration and inflow of clean waters reduce future capacity increases both locally and in the regional treatment system.
COST CONSIDERATIONS:Reduction of inflow and infiltration reduces metered flow which determines the City share of Met Council regional system expense.
Project # 15-149
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam The Heights Trunk Sewer Rehabilitation
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000200,000Planning and Design
1,000,0001,000,000Construction
1,200,000 1,200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,200,0001,200,000Utility Fund: Sewer
1,200,000 1,200,000Total
Friday, November 18, 2016Page 104
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will repair manholes and line sanitary trunk sewer on the oldest trunk sewer line in Edina, along Minnehaha Creek.
This project is described as project areas 3 and 5 in the Trunk Sanitary Sewer Infiltration Study Report (December 2013).
ENVIRONMENTAL CONSIDERATIONS:Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations.
Efforts to reduce infiltration and inflow of clean waters reduce future capacity increases both locally and in the regional treatment system.
COST CONSIDERATIONS:Reduction of inflow and infiltration reduces metered flow which determines the City share of Met Council regional system expense.
Project # 15-150
Priority 3 Significant
JustificationAs stated in Edina's 2000 strategic plan, Vision 20/20; "a sound public infrastructure encourages the development of a stable private infrastructure, leading to an enhancement of the sense of quality that Edina has and will enjoy." This project follows Vision 20/20 strategies related to providing capital investments that balance need and affordability, and accommodating the efficient movement of people and goods in and around Edina.
Useful Life
Project Nam Minnehaha Trunk Sewer Rehabilitation
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,100,0001,100,000Construction
1,100,000 1,100,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,100,0001,100,000Utility Fund: Sewer
1,100,000 1,100,000Total
Friday, November 18, 2016Page 105
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves concrete sidewalk construction along the east side of Oaklawn Avenue from W 72nd Street to the cul-de-sac just south of Gilford Avenue. This new sidewalk will connect to existing sidewalks on W 72nd Street near Cornelia Elementary School, and to the Edina segment of the proposed Nine Mile Creek Regional Trail on Parklawn Avenue.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 15-154
Priority 3 Significant
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Oaklawn Avenue Sidewalk
Category Infrastructure
Type Expand or enhance
Contact Mark Nolan
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior254,800254,800Construction
254,800 254,800Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
254,800254,800PACS Fund: Utility Franchise Fees
254,800 254,800Total
Friday, November 18, 2016Page 106
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project includes the design of Water Treatment Plant 5 to be located on property previously acquired for this purpose along France Avenue just north of the Southdale water tower. This plant will filter water from wells 5, 18, and potentially futurewell 21.
Permitting and design will take place in 2017 and are associated with ENG-15-163 (newstorage) and ENG-15-164 (new well 21 and raw water line.) With three 1000 gpm wellssuppling the plant, the capacity would be over 4MGD. Construction will take place from late 2017 and 2018.
ENVIRONMENTAL CONSIDERATIONS:Domestic water quality will improve with filtration capacity increasing such that only on peakuse days will unfiltered water be provided to the supply. Expansion of water system capacity is related to peak demand growth, and stable demand due to population growth. Although Edina has fairly aggressive conservation rates extensive lawn irrigation leads to a high peaking factor.
COST CONSIDERATIONS:This project qualifies for TIF / HRA funding. If Southdale TIF generates additional revenue,in it's closing years, funding could be directed to this project.
Project # 15-162
Priority 3 Significant
JustificationThis project is necessary to provide better quality water in Southeast Edina, provide additional filtered water production capacity, additional operating flexibility, and meet future water demand.
The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Plan references include:Comprehensive Plan Chapter 8Water System Demand and Capacity Analysis (2013)Wellhead Protection Plan (2013)Water Distribution System Analysis (2002)
Useful Life
Project Nam New Water Treatment Plant 5
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior500,000500,000Planning and Design
8,250,0001,500,000 6,750,000Construction
2,000,000 6,750,000 8,750,000Total
Friday, November 18, 2016Page 107
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
8,750,0002,000,000 6,750,000Utility Fund: Water
2,000,000 6,750,000 8,750,000Total
Friday, November 18, 2016Page 108
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project includes a design alternative for additional water storage at Water TreatmentPlant 5 (15-162)
Feasibility, permitting and design will take place in 2017 and is associated with 15-162 (WTP5) and15-164 (new well 21 and raw water line).
If deemed necessary, construction could take place from late 2017 and 2018 in conjunction with water treatment plant #5.
ENVIRONMENTAL CONSIDERATIONS:This option would take significant energy (concrete) to build, but would not have an ongoing energy cost.
Project # 15-163
Priority 6
JustificationThis project is an alternate to provide a more reliable water supply by providing additional storage capacity to meet peak demand.
Useful Life
Project Nam New Storage at WTP 5
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,000,0001,000,000Construction
1,000,000 1,000,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,000,0001,000,000Utility Fund: Water
1,000,000 1,000,000Total
Friday, November 18, 2016Page 109
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project includes a design alternative for an additional well supplying Water Treatment Plant 5 (15-162)
Permitting and design will take place as part of the planning for Water Treatment Plant 5 in early 2016 as this alternative will effect the final scope of the plant. Construction will take place in 2019 after initial startup of the plant.
ENVIRONMENTAL CONSIDERATIONS:This alternative will take energy to build, and has an ongoing energy cost to run the well. Cost/benefit of high efficiency options could be studied with the development of WTP 5.
Project # 15-164
Priority 6
JustificationThis project is necessary to provide better quality water in Southeast Edina, and meet future water demand.
A sound public infrastructure encourages the development of a stable private infrastructure, leading to an enhancement of the sense of quality that Edina has and will enjoy. Objective 5 of the Edina Vision is to take an active role in future redevelopment strategies. Southeast Edina is planned for increased density. Sanitary sewer and water capacity are fundamental to this objective.
Plan references include:Comprehensive Plan Chapter 8Water System Demand and Capacity Analysis (2013)Wellhead Protection Plan (2013)Water Distribution System Analysis (2002)
Useful Life
Project Nam Well 21 and Raw Water Line
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior675,00075,000 600,000Construction
75,000 600,000 675,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
675,00075,000 600,000Utility Fund: Water
75,000 600,000 675,000Total
Friday, November 18, 2016Page 110
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Comprehensive Water Resource Management Plan addresses stormwater runoff, flood control, water, and wetland habitat issues. The document is based on hydrologic and hydraulic modeling to identify current and future stormwater issues, especially those related to future development and redevelopment. The updated Comprehensive Water Resource Management Plan, due to be finalized in 2017 will identify and prioritize many drainage and flood improvements to be addressed.
This project will implement those issues with the highest priority that are not already scheduled to be corrected as part of the neighborhood street reconstruction program.
ENVIRONMENTAL CONSIDERATIONS:This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the City of Edina Comprehensive Water Resource Management Plan.
Project # 15-169
Priority 4
JustificationThis project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the City of Edina Comprehensive Water Resource Management Plan.
Useful Life
Project Nam Flood Protection & Clean Water Improvements
Category Infrastructure
Type Expand or enhance
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00010,000 10,000Planning and Design
200,000100,000 100,000Construction
110,000 110,000 220,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
220,000110,000 110,000Utility Fund: Storm
110,000 110,000 220,000Total
Friday, November 18, 2016Page 111
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Comprehensive Water Resource Management Plan addresses stormwater runoff management and flood control, water quality management, and wetlands protection. The document is based on hydrologic and hydraulic modeling to identify current and future stormwater issues, especially those related to future development and redevelopment. This item would update the Comprehensive Water Resource Management Plan through an amendment that would revise the models used for decision making and the recommendations for improvements.
ENVIRONMENTAL CONSIDERATIONS:The plan will consider trade offs between flood protection, clean water, and drainage service levels with a preference for managing for multiple benefits, low impact development and green infrastructure where it can cost effectively accomplish the goal.
Project # 15-170
Priority 5 Important
JustificationThis project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the City of Edina Comprehensive Water Resource Management Plan.
Useful Life
Project Nam Comprehensive Water Resource Management Plan
Category Infrastructure
Type Expand or enhance
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior167,000167,000Planning and Design
167,000 167,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
167,000167,000Utility Fund: Storm
167,000 167,000Total
Friday, November 18, 2016Page 112
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project continues to update and improve our current asset management system computer software and associated equipment to be more interactive with the public and mobile with City Staff.
The current system contains map and condition assessment information on all infrastructure assets such as water, sanitary, storm, transportation, traffic and electrical systems. Software systems connect the EdinaToGo citizen request application with Cityworks asset management software and ESRI geographical information system software. Public works crews use tablets to assess and record infrastructure condition, create and fulfill service requests and work orders.
ENVIRONMENTAL CONSIDERATIONS:Efficiency in management and operations allows more work with less trips and effort.
Project # 15-173
Priority 6
JustificationThe need is emphasized in the 2008 Edina Comprehensive Plan to "evaluate and employtechnological advancements to provide city services" and to "provide a level of City servicesthat sets Edina apart from other communities."
Useful Life
Project Nam Asset Management Software and Equipment
Category Technology
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior175,00035,000 35,000 35,000 35,000 35,000Software
35,000 35,000 35,000 35,000 35,000 175,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00010,000 10,000 10,000 10,000 10,000Utility Fund: Sewer
75,00015,000 15,000 15,000 15,000 15,000Utility Fund: Storm
50,00010,000 10,000 10,000 10,000 10,000Utility Fund: Water
35,000 35,000 35,000 35,000 35,000 175,000Total
Friday, November 18, 2016Page 113
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves upgrading the existing West 54th Street gravel road and adjacent alleys to an asphalt surface and providing a turn-around for maintenance vehicles. This includes grading of the existing street, installation of a new bituminous surface, installation of curb and gutter, paving of the alleys and upgrading of public utilities (watermain, sanitary sewer, and storm sewer) within the project area.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60..
Project # 15-174
Priority 1 Critical
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the road surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Chowen Park D Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior266,035266,035Construction
266,035 266,035Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
170,000170,000Construction Fund: Special Assessments
17,68217,682Utility Fund: Sewer
56,12756,127Utility Fund: Storm
22,22622,226Utility Fund: Water
Friday, November 18, 2016Page 114
Capital Improvement Plan
City of Edina, MN
2017 2021thru
266,035 266,035Total
Friday, November 18, 2016Page 115
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReconstruct approx. 3,610 lineal feet of W. 77th Street from the Highway 100 interchange to Parklawn Avenue. This city street is currently configured with 5-lanes, including a continuous two way left turn lane. While this street remains functional, the configuration does not serve future development plans. The Pentagon Park developer intends to rebuild the road to better serve users of the existing and new facilities. The new roadway will remain 2-lanes in each direction. The center lane will be reconfigured to include left turn bays and a landscaped median. 10' boulevards and 6' concrete sidewalks will be added on each side of the street. Pedestrian lighting and intersection lighting will also be added.
The existing right-of-way is 66 feet wide. Additional ROW or easement may need to be acquired to accommodate the improvement. The cost of acquiring such easement is not included in this estimate.
COST CONSIDERATIONS:The project cost uses $728/LF. The cost of the reconstruction is anticipated to be borne by the Developer with reimbursement from the Pentagon Park TIF District. A portion of the cost may be assessed (via the MN 429 process) to adjacent property owners who benefit from the improvement.
Project # 15-176
Priority 6
JustificationThe 2008 Comprehensive Plan identifies Pentagon Park as a potential area of change (page 4-33). In March 2014, the City Council approved preliminary rezoning of the site as well as the overall Development Plan. In May 2014, the City and the developer entered into a Redevelopment Agreement based on the approved plan.
The plan call for a variety of new buildings as well as several new public roadways to better serve the area. Future routes are envisioned to address the needs of drivers, bicyclists, pedestrians and transit riders. The elements of the preliminary plan are intended to be implemented in phases based on market demand. All improvements will be constructed in accordance with City standards and other applicable regulations.
Useful Life
Project Nam Pentagon Park - W 77th Street
Category Infrastructure
Type Expand or enhance
Contact Bill Neuendorf
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Planning and Design
2,735,0002,735,000Construction
150,000 2,735,000 2,885,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
2,885,000150,000 2,735,000Unfunded
150,000 2,735,000 2,885,000Total
Friday, November 18, 2016Page 116
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionA new crossing is anticipated on W. 77th Street, east of the Highway 100 interchange. This crossing is necessary to accommodate a new trail connection for pedestrians and bicyclists. The developer proposes this trail to better connect users of the Pentagon Park site to the Nine Mile Creek regional trail.
At this time, specific details of the crossing and design are not known. The cost estimate is based on two recent projects that are similar in scale. A more refined estimate will be provided when the type and configuration of the crossing is further refined.
COST CONSIDERATIONS:The cost of the bridge is anticipated to be borne by the Developer with reimbursement from the Pentagon Park TIF District.
Project # 15-177
Priority 7 Desirable
JustificationThe 2008 Comprehensive Plan identifies Pentagon Park as a potential area of change (page 4-33). In March 2014, the City Council approved preliminary rezoning of the site as well as the overall Development Plan. In May 2014, the City and the developer entered into a Redevelopment Agreement based on the approved plan.
The plan call for a variety of new buildings as well as several new public roadways to better serve the area. Future routes are envisioned to address the needs of drivers, bicyclists, pedestrians and transit riders. The elements of the preliminary plan are intended to be implemented in phases based on market demand. All improvements will be constructed in accordance with City standards and other applicable regulations.
Useful Life
Project Nam Pentagon Park - 77th Street Crossing
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Planning and Design
2,415,0002,415,000Construction
150,000 2,415,000 2,565,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
2,565,000150,000 2,415,000Unfunded
150,000 2,415,000 2,565,000Total
Friday, November 18, 2016Page 118
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionAs part of the redevelopment of the Pentagon Park South parcel, the adjacent supporting streets will need to be improved. Work is anticipated to the Highway 100 east frontage road (Normandale), Viking Drive and Computer Avenue; approx. 3,700 lineal feet. The existing pavement is anticipated to be maintained and the roadway would be re-striped to include 12' thru lanes and 10' parking lanes. Additionally, 10' boulevards and 6' sidewalks would be added to both sides. Pedestrian lighting and landscaping would also be added. Additional right-of-way or easements may be necessary, but are not included in the cost estimate since they could be donated from the developer.
COST CONSIDERATIONS:The cost is based on $439/LF. The cost of this work is anticipated to be borne by the Developer with reimbursement from the Pentagon Park TIF District.
Project # 15-178
Priority 6
JustificationThe 2008 Comprehensive Plan identifies Pentagon Park as a potential area of change (page 4-33). In March 2014, the City Council approved preliminary rezoning of the site as well as the overall Development Plan. In May 2014, the City and the developer entered into a Redevelopment Agreement based on the approved plan.
The plan call for a variety of new buildings as well as several new public roadways to better serve the area. Future routes are envisioned to address the needs of drivers, bicyclists, pedestrians and transit riders. The elements of the preliminary plan are intended to be implemented in phases based on market demand. All improvements will be constructed in accordance with City standards and other applicable regulations.
Useful Life
Project Nam Pentagon Park - Viking Drive and Computer Avenue
Category Infrastructure
Type Expand or enhance
Contact Bill Neuendorf
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Planning and Design
1,525,0001,525,000Construction
150,000 1,525,000 1,675,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,675,000150,000 1,525,000Unfunded
150,000 1,525,000 1,675,000Total
Friday, November 18, 2016Page 119
Capital Improvement Plan
City of Edina, MN
2017 2021thru
Description76th Street is a new east-west roadway anticipated along the north side of the Pentagon Park property. It is approx. 3,460 lineal feet, located adjacent to the Nine Mile Creek regional trail and the City-owned Fred Richards land. The new street would connect three future north-south streets that are located on the Pentagon Park land. This street would be designed for low travel speeds and would not be designated as a truck route.
The proposed roadway includes two - 12' travel lanes and two - 10' parking lanes. A 10' boulevard and 6' concrete sidewalk are anticipated on the south side and a 10' boulevard and 10' bituminous trail are anticipated on the north side of the street. The total project cost anticipates soil stabilization.
COST CONSIDERATIONS:The cost is based on $2,144/LF. The cost of this work is anticipated to be borne by the Developer with reimbursement from the Pentagon Park TIF District.
Project # 15-179
Priority 7 Desirable
JustificationThe 2008 Comprehensive Plan identifies Pentagon Park as a potential area of change (page 4-33). In March 2014, the City Council approved preliminary rezoning of the site as well as the overall Development Plan. In May 2014, the City and the developer entered into a Redevelopment Agreement based on the approved plan.
The plan call for a variety of new buildings as well as several new public roadways to better serve the area. Future routes are envisioned to address the needs of drivers, bicyclists, pedestrians and transit riders. The elements of the preliminary plan are intended to be implemented in phases based on market demand. All improvements will be constructed in accordance with City standards and other applicable regulations.
Useful Life
Project Nam Pentagon Park - 76th Street
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Planning and Design
7,675,0007,675,000Construction
150,000 7,675,000 7,825,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
7,825,000150,000 7,675,000Unfunded
150,000 7,675,000 7,825,000Total
Friday, November 18, 2016Page 120
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThree new "Green Streets" are anticipated as part of the Pentagon Park redevelopment. Total length is approx. 1,880 lineal feet. These streets run north-south and connect 77th Street and the future 76th Street. They could also provide improved public access to the Nine Mile Creek regional trail and the City-owned Fred Richards site. These streets would terminate at 76th Street and would not connect to the Lake Edina residential neighborhood to the north. They are envisioned with slow travel speeds and not designated as truck routes.
The new roadways are anticipated to include two - 12' thru lanes and two - 10' parking lanes. In addition, the street will include 6' boulevards and 6' concrete sidewalks on each side of the street. Right-of-way is anticipated to be donated.
COST CONSIDERATIONS:The cost is based on $2,187/LF. The cost of this work is anticipated to be borne by the Developer with reimbursement from the Pentagon Park TIF District.
Project # 15-180
Priority 6
JustificationThe 2008 Comprehensive Plan identifies Pentagon Park as a potential area of change (page 4-33). In March 2014, the City Council approved preliminary rezoning of the site as well as the overall Development Plan. In May 2014, the City and the developer entered into a Redevelopment Agreement based on the approved plan.
The plan call for a variety of new buildings as well as several new public roadways to better serve the area. Future routes are envisioned to address the needs of drivers, bicyclists, pedestrians and transit riders. The elements of the preliminary plan are intended to be implemented in phases based on market demand. All improvements will be constructed in accordance with City standards and other applicable regulations.
Useful Life
Project Nam Pentagon Park - Green Streets
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Planning and Design
4,170,0004,170,000Construction
150,000 4,170,000 4,320,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
4,320,000150,000 4,170,000Unfunded
150,000 4,170,000 4,320,000Total
Friday, November 18, 2016Page 122
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis item includes replacing equipment based on the replacement schedule. The Engineering Department's equipment includes several vehicles, surveying and inspection tools, and computer software.
Project # 15-181
Priority 4
JustificationThe need is emphasized in the 2008 Edina Comprehensive Plan to "evaluate and employ technological advancements to provide city services" and to "provide a level of City services that sets Edina apart from other communities." Most of the vehicles have an estimated useful life of 10 years. Surveying/inspection equipment varies between 7 and 15 years, and software is schedule for every 10 years. Regular updates to equipment keeps maintenance costs low, and promotes better job performance by allowing staff to stay up-to-date with technological advances.
Useful Life
Project Nam Engineering Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior130,00028,000 75,000 27,000Vehicles and Equipment
28,000 75,000 27,000 130,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
130,00028,000 75,000 27,000Construction Fund: Equipment Levy
28,000 75,000 27,000 130,000Total
Friday, November 18, 2016Page 123
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace equipment according to the equipment replacement schedule.
The Communications & Technology department has a variety of equipment, including cameras, audio and visual equipment, monitors, multi-function printers, servers, switches and routers. Most of this type of electronic equipment has a useful life of 5 to 10 years.
Project # 15-182
Priority 1 Critical
JustificationRegular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Nam CTS Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Ryan Browning
Department Communications and Technolog
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,642,960150,000 474,000 729,960 193,000 96,000Vehicles and Equipment
150,000 474,000 729,960 193,000 96,000 1,642,960Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
66,9603,000 57,960 6,000Construction Fund: Cable PEG
1,576,000150,000 471,000 672,000 187,000 96,000Construction Fund: Equipment Levy
150,000 474,000 729,960 193,000 96,000 1,642,960Total
Friday, November 18, 2016Page 124
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionIn May 2014, the City hired Geographic Technologies Group to conduct a GIS Needs Assessment and develop a multi-year GIS Strategic Plan. The project goals included an evaluation of the City's current GIS capabilities, staffing structure and vendor utilization, as well as detailing recommendations on how to grow the City's GIS, improve departmental internal GIS capabilities and enhance external services to residents. An update to the plan was completed in 2016 by WSB & Associates. The following represents the general findings of the existing GIS conditions within the City:1. GIS is under-utilized for a City the size and complexion of Edina.2. The majority of City departments (87 percent) feel that the current state of GIS is not meeting their needs.3. The City's LOGIS GIS solution is currently under-utilized due to functionality.4. There are significant opportunities enterprise-wide and departmental for GIS growth.5. There are many characteristics of the existing GIS that indicate that the City does not have a true enterprise and scalable GIS.6. There is a general departmental understanding of the value GIS.7. There is poor accessibility to the City's GIS data and data layers.8. There is a lack of GIS collaboration and teamwork.9. There is a distinct lack of GIS training, education and knowledge transfer.10. Enterprise GIS project are not well planned, managed, prioritized or coordinated.11. GIS costs are not in line with the City's existing level of service.
GTG's recommended five-year project includes six goals for an enterprise-wide implementation of GIS:1. Implement an optimum GIS model.2. Build an maintain reliable GIS data.3. Integrate GIS functionality with existing systems.4. Make GIS data accessible for all departments and residents.5. Train, educate and inform state.6. Build and maintain enterprise infrastructure.
Estimates for software have decreased by about $100,000 since GTG completed its needs assessment.
COST CONSIDERATIONS:Citywide adoption and utilization of GIS is currently far behind many comparable metro cities and where we want to be to provide the best services for our residents. We are currently behind Shoreview, a smaller city than Edina.
Although we have listed the Construction Fund as the primary funding source, we believe that it is likely that large portions of annual expenses could be covered by other sources based on the projects undertaken. For instance, the Utilities Division is a large user of GIS and may have funds available. HRA could retrieve maps and data relative to current economic initiatives. E911 funds could be used for GIS projects related to Police dispatching. The Golf Course fund could be used for a variety of initiatives at the Golf Course. HR could use GIS for risk analysis and claims in natural disaster areas. Finance could use GIS to map out utility billing, taxes and more. As more sources are identified, we can distribute costs accordingly.
Project # 15-183
Priority 2
Useful Life
Project Nam GIS Infrastructure
Category Technology
Type Expand or enhance
Contact Nick Lovejoy
Department Communications and Technolog
Status Active
Friday, November 18, 2016Page 125
Capital Improvement Plan
City of Edina, MN
2017 2021thru
JustificationThe City has fallen behind greatly in the enterprise application of GIS. Implementing the five-year plan will be a sea change not unlike the impact and efficiency of the City's first basic network (when computers and printers were not standalone units in each office or cubicle) or the advance of the World Wide Web.
With a more sophisticated infrastructure, departments would be better able to share relevant and timely information throughout the organization, helping staff across all departments collaborate and deliver a higher level of service. With an information system like GIS, staff have access to the tools they need to create, manage and share authoritative information and applications.
As a city, everything we do revolves around land and the infrastructure built upon it. For this reason, nearly every service we provide relates to an address. Police and Fire respond to accidents and property damage on our streets, at our facilities and at commercial and residential addresses. Economic Development analyzes the economic impact of various changes in the city. Engineering and Public Works are intimately involved in the planning and repair of all city roads and utilities. Parks & Rec hold hundreds of programs at the various city facilities as well as hires students from the area for various jobs. The enterprise facilities market their services to patrons inside and outside of the city.
Data that we collect from all of these interactions with land, property, infrastructure and people can contribute to this GIS. That data can then be used to better analyze, plan, repair, market and respond. Currently, the City has a few separate GIS systems. The plan seeks to combine those in one system so data of all types could be shared across the organization.
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior611,000111,000 135,000Vehicles and Equipment 83,000282,000827,27818,300 18,300Software 678,178112,500211,120104,000Staff 107,120
129,300 257,300 1,649,398Total 868,298394,500
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,094,898129,300 217,300Construction Fund: Available Funding
748,298
160,00040,000General Fund 120,000394,500Unfunded 394,500
129,300 257,300 1,649,398Total 868,298394,500
Friday, November 18, 2016Page 126
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City’s installed fiber optic network provides connectivity from City Hall to remote City facilities and LOGIS, facilitating voice and data communication at very high speeds. Fiber optic technology is secure, reliable and fast, and has a useful life expectancy of approximately 30 years. Nearly all of the City’s staffed facilities are now connected via fiber optic lines.
The City has used fiber optic technology to replace traditional copper, leased circuits, and wireless connections in order to improve bandwidth, consolidate connectivity needs, and reduce or eliminate telephone and data communication expenses. By leveraging a single-owned connection method for multiple technology and communication needs, the City has been able to eliminate expensive recurring T-1 voice and data connections, while dramatically improving performance and management of the City’s voice and data network.
The Utilities Division would like to connect a number of their facilities to the fiber network in order improve communications. Currently, those Utilities systems operate on SCADA radio systems, which are susceptible to wind, rain and ice storms that make the systems vulnerable. If fiber is run to those facilities, the Public Works Department would have redundancy in place that does not exist today. Funds could also be used for any emergency repairs to our existing fiber connections.
Estimates for proposed fiber sites: 2017: New Treatment Plant $100,0002018: Water Treatment #3 and Fred Richards Site $60,000 2019: Water Tower #5 and Water Treatment #4 $265,0002020: Water Tower #2 and Well #19 $145,0002020: Centennial Lakes maintenance building $25,0002021: Dublin Reservoir $90,000 2022: Lift Station #6 and #13 $35,0002022: Courtney Fields $20,000
A yearly allocation to this important City infrastructure allows the Communications & Technology Services Department the flexibility to be responsive as buildings are built, remodeled or re-purposed. Without this fund, the connections to these buildings are subject to the project funds available at the time. In the past, this has resulted in slow connections that are not easily managed nor flexible enough to support future needs at the buildings.
COST CONSIDERATIONS:Once fiber is in place, the City will be able to eliminate expensive recurring T-1 voice and data connections, while dramatically improving performance and management of the City’s voice and data network.
Instead of the Construction Fund, the Utilities Fund could pay for the projects at Water Treatment #3, Water Tower #5, Water Treatment #4, Water Tower #2, Well #19, Dublin Reservoir, Lift Station #6, Lift Station #13 and new treatment plant. Fiber to Fred Richards Park could be extended as part of the master plan improvements there in the future.
Project # 15-184
Priority 3 Significant
Justification
Useful Life
Project Nam Citywide Fiber Optic Cabling
Category Technology
Type Expand or enhance
Contact Ryan Browning
Department Communications and Technolog
Status Pending
Friday, November 18, 2016Page 127
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior740,000100,000 60,000 265,000 170,000 90,000Vehicles and Equipment 55,000
100,000 60,000 265,000 170,000 90,000 740,000Total 55,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
740,000100,000 60,000 265,000 170,000 90,000Unfunded 55,000
100,000 60,000 265,000 170,000 90,000 740,000Total 55,000
Friday, November 18, 2016Page 128
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionTo meet the demands of our customers, the Communications & Technology Services Department began working with LOGIS to develop a plan to implement free wireless network and internet access (Wi-Fi) in 2012. The goal of the initial Edina wireless project was to establish Wi-Fi coverage to be used by the public and City staff at Edina City Hall, Edina Art Center, Braemar Arena, Braemar Golf Course, Centennial Lakes Park, Edinborough Park, Edina Senior Center and the Public Works & Park Maintenance Facility. Wi-Fi has since been expanded to the Braemar Golf Dome and parts of Countryside and Rosland parks.
Future expansion of the project will include increasing coverage at existing sites as well as adding Wi-Fi to new facilities and some outdoor parks.
Free wireless internet access has become so commonplace that people visiting City Hall and other City facilities expect it. As Wi-Fi capable devices continue to become increasingly more prevalent in the daily lives of the public and City staff, offering this service adds a significant benefit to the City’s residents, customers and staff.
Project # 15-185
Priority 5 Important
JustificationWiFi is a critical piece of our communications and technology offering to both our residents and staff at City facilities. We want to make sure that we are providing a system that allows our staff to be productive and our residents to be connected.
Useful Life
Project Nam City of Edina Wireless Network
Category Technology
Type Expand or enhance
Contact Ryan Browning
Department Communications and Technolog
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior375,00075,000Vehicles and Equipment 300,000
75,000 375,000Total 300,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
375,00075,000Unfunded 300,000
75,000 375,000Total 300,000
Friday, November 18, 2016Page 129
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionA gateway sign is often the first impression people have of a city, development, business park or other public place. A well planned and executed gateway sign is important because it gives an immediate sense of a brand and denotes a sense of pride and caring, and makes visitors feel welcome.
The City’s Branding Committee and Communications & Technology Services Department recommend the placement of "Welcome to Edina" gateway signs.
A consultant has started work on this concept for the 66th and York Intersection. If the concept is approved at this location, we will look for other opportunities related to development to implement similar installations.
Project # 15-189
Priority 7 Desirable
JustificationOne of the City Leadership Priorities in the 2012 Work Plan was "Improve Communications Tools." One of the objectives toward meeting that goal is to implement branding standards.
One of the City Leadership Priorities in the 2014 Work Plan is "Development and renewal of commercial and residential areas is essential to the on-going health of the city." Gateway signs that better reflect the City's brand will contribute to the renewal of those places.
Useful Life
Project Nam Gateway Signs
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior10,000Planning and Design 10,000
250,00050,000 50,000 50,000 50,000 50,000Construction
50,000 50,000 50,000 50,000 50,000 260,000Total 10,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
260,00050,000 50,000 50,000 50,000 50,000HRA Fund: Centennial Lakes TIF
10,000
50,000 50,000 50,000 50,000 50,000 260,000Total 10,000
Friday, November 18, 2016Page 130
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace two (2) staff vehicles according to the equipment replacement schedule. The Inspections division has several passenger vehicles used to get Inspectors to various work sites around the City. These vehicles have an estimated useful life of 10 years. This purchase will replace a 2004 and 2007 vehicle.
ENVIRONMENTAL CONSIDERATIONS:Tentative plan is to replace both vehicles with hybrid technology.
Project # 15-194
Priority 3 Significant
JustificationRegular updates to equipment helps to keep maintenance costs low. The 2004 Ford Taurus is in need of significant repair/maintenance work. The 2004 vehicle was reassigned within the department to extend its service time but know Fleet Services has recommended it be replaced. The 2007 Chevy Malibu has reached its 10 year replacement schedule and currently is one of the highest mileage vehicles in the fleet.
Useful Life
Project Nam Inspections Division Vehicle Replacement (2017)
Category Equipment and Vehicles
Type Replace or repair
Contact Dave Fischer
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Vehicles and Equipment
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Construction Fund: Equipment Levy
40,000 40,000Total
Friday, November 18, 2016Page 131
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 2010 ambulance according to 6-year replacement schedule. Adhering to the 6-year schedule is essential to ensure a highly reliable fleet of ambulances. Regular updates to equipment helps to keep maintenance costs low over the 6-year service life of the vehicle.
ENVIRONMENTAL CONSIDERATIONS:Updating the ambulance fleet on a set schedule ensure the latest in environmental and technological advances that are available in vehicles consistent with the delivery of ambulance service.
Project # 15-196
Priority 1 Critical
JustificationThe 2010 Type III ambulance will be replaced with a Type I ambulance. The industry is moving all future ambulance chassis to F-Series. The 2010 E-Series Type III box cannot be re-chassised to the F-Series.
Useful Life
Project Nam Ambulance Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Schmitz
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000200,000Vehicles and Equipment
200,000 200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
200,000200,000Construction Fund: Equipment Levy
200,000 200,000Total
Friday, November 18, 2016Page 132
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionMobile Command Vehicle (MCV) jointly operated by Edina police and fire departments to manage significant incidents within the City. The MCV will create a mobile space that will allow for unified command primarily made up of police, fire and EMS personnel that can jointly manage emergent and non-emergent incidents. The MCV and its enhanced capabilities could be used as a regional asset to support other public safety agencies in large-scale incidents in the area. The MCV will have the latest communications capabilities, galley, rest room facilities, workstation and conference room.
Project # 15-199
Priority 7 Desirable
JustificationThe MCV will serve as a unified command post during large scale events, both planned and unplanned. It will include technology to support a 9-1-1 call center should a catastrophic event render Edina Communications uninhabitable. The MCV will be capable of supporting an alternate EOC should the need arise. The MCV would provide a secure area to conduct investigations and crisis response.
Useful Life
Project Nam Mobile Command Vehicle
Category Equipment and Vehicles
Type New
Contact Tom Schmitz
Department Fire
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior325,000325,000Vehicles and Equipment
325,000 325,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
325,000325,000Unfunded
325,000 325,000Total
Friday, November 18, 2016Page 133
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace two (2) 2007 Chevrolet Tahoe vehicles according to the equipment replacement schedule. These vehicle are utilized by fire command staff for emergency response and day-to-day activity.
Project # 15-201
Priority 3 Significant
JustificationRegular replacement of these vehicles because of the high mileage and emergency response activity after 10 year service life is critical to keep maintenance costs low.
Useful Life
Project Nam Fire Command Staff Vehicle (2017)
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Schmitz
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior70,00070,000Vehicles and Equipment
70,000 70,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
70,00070,000Construction Fund: Equipment Levy
70,000 70,000Total
Friday, November 18, 2016Page 134
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 1998 fire engine according to the equipment replacement schedule.
Project # 15-203
Priority 3 Significant
JustificationReplacing a 20 year old fire engine will help keep maintenance costs low. All three engines are place on a rotating schedule throughout their life span. This is critical to keep the fleet of engines in a state of readiness.
Useful Life
Project Nam Fire Engine Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior550,000550,000Vehicles and Equipment
550,000 550,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
550,000550,000Construction Fund: Equipment Levy
550,000 550,000Total
Friday, November 18, 2016Page 135
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionUpgrade warning siren #9 (7235 France Avenue). The last time this siren was replaced/upgraded was 1993.
Project # 15-204
Priority 2
JustificationRegular updates to equipment helps to keep maintenance costs low and ensure the latest in technology.
Useful Life
Project Nam Siren #9 Replacement
Category Infrastructure
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior19,00019,000Vehicles and Equipment
19,000 19,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
19,00019,000Construction Fund: Equipment Levy
19,000 19,000Total
Friday, November 18, 2016Page 136
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace two (2) vehicles according to the equipment replacement schedule. The Inspections division has several passenger vehicles used to get Inspectors to various work sites around the City. These vehicles have an estimated useful life of 10 years.
ENVIRONMENTAL CONSIDERATIONS:Tentative plan is to replace vehicle with hybrid technology.
Project # 15-205
Priority 3 Significant
JustificationRegular updates to equipment helps to keep maintenance costs low. Will replace 2008 passenger vehicle.
Useful Life
Project Nam Inspections Division Vehicle Replacement (2018)
Category Equipment and Vehicles
Type Replace or repair
Contact Dave Fischer
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior21,00021,000Vehicles and Equipment
21,000 21,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
21,00021,000Construction Fund: Equipment Levy
21,000 21,000Total
Friday, November 18, 2016Page 137
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionRe-chassis 2012 Type I ambulance (393) according to 6-year replacement schedule.
Project # 15-206
Priority 2
JustificationAdhering to the 6-year schedule is essential to ensure a highly reliable fleet of ambulances. Regular updates to equipment help to keep maintenance costs low over the 12-year service life of the vehicle.
Useful Life
Project Nam 2012 Ambulance
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Schmitz
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior180,000180,000Vehicles and Equipment
180,000 180,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
180,000180,000Construction Fund: Equipment Levy
180,000 180,000Total
Friday, November 18, 2016Page 138
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace three (3) 2011 Chevrolet Tahoe staff vehicles with similar according to the equipment replacement schedule. These vehicle are utilized by fire command staff for emergency response and day-to-day activity.
Project # 15-207
Priority 3 Significant
JustificationRegular replacement of these vehicles because of the high mileage and emergency response activity after 10 year service life is critical to keep maintenance costs low.
Useful Life
Project Nam Fire Department Staff Vehicles Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Schmitz
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior105,000105,000Vehicles and Equipment
105,000 105,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
105,000105,000Construction Fund: Equipment Levy
105,000 105,000Total
Friday, November 18, 2016Page 139
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis proposal is for the replacement of the store conveyor belt in the 50th and France Edina Liquor store. The conveyor belt is used to transport merchandise from delivery trucks into storage. The current belt was installed in the 1960s. The motors that run the conveyor system are outdated and it is getting increasingly difficult to find parts to fix them. When they do break down it takes 2 to 4 days before we can get them fixed which make us less efficient and it increases chances for injury due to the fact that employees have to then carry product up a case at a time by stairs. The existing belt includes an sharp incline which has resulted in numerous accidents that creates a safety hazard and results in a loss of product and therefore profit. Additionally, the delivery door for the conveyor belt is not air tight and results in high energy costs for the operation.
This proposal is requesting a replacement belt with an system that extends an additional 10-15 feet to reduce the incline and consequently the accidents on the line. In addition, this proposal will require replacing the existing door with a high efficiency door that will reduce climate controlled leakage and reduce energy costs.
ENVIRONMENTAL CONSIDERATIONS:The new equipment is more energy efficient than our current technology. In addition, the new door will reduce air leakage from our facility reducing energy costs.
Project # 15-210
Priority 3 Significant
JustificationThe Vision Edina Mission Statement reads: “Our mission is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The replacement of this conveyer belt is an investment in our community infrastructure by helping us to be more efficient and competitive. In addition, it is an investment in our employees health and wellness.
In addition, this project promotes Vision Edina Strategic Focus Area 7 Environmental Stewardship: “Community residents and stakeholders believe that Edina can take an active and ambitious internal and regional leadership role in embedding environmental stewardship principles.” By upgrading the conveyor belt we have an opportunity to replace outdated technology with high efficiency technology that reduces our energy consumption and improves the stainability of our operations.
Useful Life
Project Nam Liquor - 50th Conveyor System
Category Equipment and Vehicles
Type Replace or repair
Contact Steve Grausam
Department Administration: Liquor Stores
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior35,00035,000Vehicles and Equipment
35,000 35,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
35,00035,000Liquor Fund
35,000 35,000Total
Friday, November 18, 2016Page 140
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionIn 2013 the City selected Laserfiche as its organization-wide electronic records management system, and branded it as City Docs. City Docs provides secure storage, retention, disaster recovery, and quick, searchable access to City records. This tool was planned to be implemented in three phases:
Phase 1) Permanent records in each department are archived, searchable and accessible to authorized employees.
To date, the majority permanent records have been scanned with the exception of records Building Inspections and Human Resources. These last two departments require additional resources to implement.
All employees have access to search authorized records. 24 employees have licenses to add and maintain records.
Phase 2) New records are stored and appropriately retained in City Docs on an ongoing basis. Records commonly requested are searchable by the public on the City's web site. There are numerous examples where the records system allowed staff to quickly and easily access information that used to take hours searching paper documents.
This phase is in process.
Phase 3) Complete scanning of old records. Begin to use City Docs to manage processes and requests that require review or approval across departments, or externally such as personnel files, data practices requests, or various other review or approval that requires routing.
This phase has not been started, and requires additional investment as indicated.
ENVIRONMENTAL CONSIDERATIONS: Environmental benefits to the project include reduction in use of paper, toner, energy, and storage.
COST CONSIDERATIONS:Additional licensing is estimated to add approximately $8,000 per year.
Project # 15-211
Priority 4
JustificationThere are many strategic advantages to this project, including:1) Secure storage and disaster recovery. 2) Improved efficiency and accuracy locating records for staff and fulfilling Data Practices requests.3) Increased transparency through web site. 4) Increased efficiency and accuracy manging retention.5) Increased efficiency and accuracy managing processes across departments. 6) Reduced costs for paper, printing, and storage.
These benefits relate to the following initiatives: Vision Edina: Sustainable Environment - Edina has focused and invested in world-class citywide resource management systems, built around the leading principles of environmental sustainability. We have substantially reduced our overall environmental impact and significantly increased our
Useful Life
Project Nam Electronic Document Management
Category Technology
Type Expand or enhance
Contact Deb Mangen
Department Administration & HRA
Status Pending
Friday, November 18, 2016Page 142
Capital Improvement Plan
City of Edina, MN
2017 2021thru
resource use efficiency. Future Oriented - Edina is willing to use its resources and expertise to apply new ideas and technology. Focus #7: Environmental Stewardship
Admin Department Work Plan: Evaluate and make recommendations to improve Internal Work Flow Develop long-term strategy for Records retention using Edina Docs and identify framework for implementing workflows.
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior173,000105,000 15,000Vehicles and Equipment 53,000180,00040,000Software 140,000
105,000 55,000 353,000Total 193,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
193,000Construction Fund: Available Funding
193,000
160,000105,000 55,000Unfunded
105,000 55,000 353,000Total 193,000
Friday, November 18, 2016Page 143
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionConstruct an expansion the North Parking Ramp at 50th and France to provide additional shared parking for customers and employees. The expansion is anticipated on City-owned property located at 3930 W. 49-1/2 Street. This land was acquired in 2013 for parking improvements.
The expansion would follow the layout of the existing 3-level North Ramp and include commercial space on the street level to generate activity and interest between nearby businesses.
ENVIRONMENTAL CONSIDERATIONS:The facility is envisioned to follow industry best practices. Shared parking is more efficient than individually owned parking lots in a dense commercial district. The new structure will improve storm water conditions and will include LED lighting fixtures. Roof-mounted solar panels and electric vehicle charging stations could also be considered.
COST CONSIDERATIONS:Maintenance and operating costs of the expanded ramp will be borne by the property owners in the 50th and France commercial area.
Project # 15-224
Priority 4
JustificationThe 2011 Walker Parking Study and 2013 Kimley-Horn Feasibility Study both call for 140 to 200 new parking stalls to more adequately address peak demand in the 50th and France Commercial Area.
This item addresses two objectives from Edina Vision 20/20: - Take an active role in redevelopment strategies, and - Provide a level of City services that sets Edina apart from other communities.
Useful Life
Project Nam HRA - North Parking Ramp Expansion
Category Infrastructure
Type Expand or enhance
Contact Bill Neuendorf
Department Administration & HRA
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000Planning and Design 200,000
2,650,000Land Acquisition 2,650,0006,000,0006,000,000Construction
6,000,000 8,850,000Total 2,850,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
6,850,0004,000,000HRA Fund: Centennial Lakes TIF
2,850,000
2,000,0002,000,000Unfunded
6,000,000 8,850,000Total 2,850,000
Friday, November 18, 2016Page 144
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Edina Promenade, a dedicated route for pedestrians and bicyclists on public right-of-way currently terminates at 70th Street. It is intended to be extended incrementally when individual properties are redeveloped. Ultimately, the North Extension will create a non-motorized route from 70th Street to Highway 62. It may be necessary to acquire public easements on some private properties to complete this project.
ENVIRONMENTAL CONSIDERATIONS:The purpose of the Promenade and the North Extension is to provide a safe and convenient route for bicyclists and pedestrians. The route can be used for both recreational and commuting purposes as a healthier and cleaner alternative than driving.
Project # 15-225
Priority 3 Significant
JustificationThe Edina Promenade pathway originated in the 2007 Promenade Urban Design Plan. The North Extension supports objective #2 (Transportation Options) in Vision Edina.
This project will provide new alternatives to better connect the residential neighborhoods and employment center located north of 66th Street and north of Highway 62 to commercial businesses in the Greater Southdale area.
Useful Life
Project Nam HRA - Promenade Phase V
Category Infrastructure
Type Expand or enhance
Contact Bill Neuendorf
Department Administration & HRA
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,000Planning and Design 30,000
600,000200,000 200,000 200,000Land Acquisition
200,000 200,000 200,000 630,000Total 30,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
630,000200,000 200,000 200,000HRA Fund: Centennial Lakes TIF
30,000
200,000 200,000 200,000 630,000Total 30,000
Friday, November 18, 2016Page 146
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe city uses portable voting stations to conduct its elections. Many of the stations were purchased in the 1980's and have reached the end of their useful life. It is anticpated that purchasing a portion of the voting stations each year for two-three years could replace the worn out stations. Voting stations cost approximately $150.00 each.
The city also owns approximately 150 large informational voting signs. Many of the signs were purchased in the early 1990's and are light weight requiring staff to weight them with sandbags to keep them in place on election day. Each year some signs go missing and are damaged becoming unusable. New signs have an approximate cost of $100 each.
Phasing the purchasing of these items over three years would allow us to update all the voting stations and purchase a sturdier sign that would have a longer life cycle.
Project # 15-226
Priority 2
JustificationRegular updates to equipment helps to keep maintenance costs low.
Useful Life
Project Nam Election Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Deb Mangen
Department Administration & HRA
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior67,50022,500 22,500 22,500Vehicles and Equipment
22,500 22,500 22,500 67,500Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
67,50022,500 22,500 22,500Construction Fund: Equipment Levy
22,500 22,500 22,500 67,500Total
Friday, November 18, 2016Page 147
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace hydraulic rescue tools - power unit, spreader, cutter, ram and assorted support equipment according to the equipment replacement schedule. This equipment is a critical component for rescuing victims in vehicles and/or other forms of entrapment. The tools were scheduled for replacement in 2015. Due to their current condition the replacement has been delayed until 2019.
Project # 15-227
Priority 2
JustificationWhen the circumstance calls for this type of tool to be used its reliability must be 100%. Regular updates to equipment helps to keep maintenance costs low and ensure that reliability. In addition, replacing these tools on a regular basis ensure they meet the demands of a rapidly changing environment, i.e. rescue tool advances must meet the advances in vehicle technology.
Useful Life
Project Nam Hydraulic Rescue Tools Replacement (2019)
Category Equipment and Vehicles
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior57,00057,000Vehicles and Equipment
57,000 57,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
57,00057,000Construction Fund: Equipment Levy
57,000 57,000Total
Friday, November 18, 2016Page 148
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis proposal is for the replacement of the camera security system at the 50th Street and Grandview Stores. The upgraded system we are proposing is currently installed in our Southdale store. Our current system is outdated as technology has changed significantly in the past 10 years. Our goal is to update our old systems so that we are consistent throughout our facilities. This will improve the efficiency of our staff as we do not have to maintain two separate IT systems.
Our current system is outdated and current require replacement parts for data storage. The upgrade will allow us to access the video footage from the internet, allowing the police to have faster access to the material in their attempts to apprehend suspects of illegal activity in or around our stores.
ENVIRONMENTAL CONSIDERATIONS:We are not aware of an greener alternatives.
Project # 17-001
Priority 3 Significant
JustificationSection 11.2 of the Comprehensive Plan reads: "protect and serve thecommunity with the highest quality of law enforcement services, and to improve the quality of life through eradication of criminal activity and conditions that have a detrimental impact on public safety." The replacement of these security cameras helps to protect against theft and criminal activity in and around Edina Liquor stores.
In addition, Vision Edina identifies five features of our future community, one of which is being "Future Oriented." The statement reds: We continually look forward and are always working to remain competitive, relevant and innovative." Updating our technology helps us to increase profits, decrease costs, and maintain a safe environment for our customers- all of which are essential for pursuing this goal.
Useful Life
Project Nam Grandview/50th Camera System
Category Technology
Type Expand or enhance
Contact Steve Grausam
Department Administration: Liquor Stores
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior70,00070,000Vehicles and Equipment
8,0008,000Installation/Maintenance
78,000 78,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
78,00078,000Liquor Fund
78,000 78,000Total
Friday, November 18, 2016Page 149
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionAcquisition of 1 to 3 acres of property for redevelopment as multi-family housing rented at prices affordable to moderate income families and seniors of limited means. No specific locations have been identified at this time. Possible locations could include properties in or near commercial districts with access to transit.
Project # 17-002
Priority 3 Significant
JustificationThe Metropolitan Council indicates that low and moderate income families are challenged to find good housing at affordable rates. They indicate that Edina's share of new affordably-priced housing units is approximately 800 new units.
Few real estate developers construct affordably-priced housing for moderate-income families and seniors of limited means. In order to advance the Vision Edina goal of creating new affordable housing, it may be necessary for the City to assemble land and sell or lease it at a reduced cost so that affordable rental rates can be provided over the long term.
Useful Life
Project Nam HRA Land Acquisition for Affordable Housing
Category Land
Type New
Contact Bill Neuendorf
Department Administration & HRA
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior3,000,0003,000,000Land Acquisition
3,000,000 3,000,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
3,000,0003,000,000HRA Fund: Southdale 2 TIF
3,000,000 3,000,000Total
Friday, November 18, 2016Page 151
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionCentennial Lakes has two pedestrian bridges that go over the lake; one at the amphitheater and the other next to the Clubhouse. Both of these steel and concrete bridges are 25 years old and are deteriorating rapidly. The bridges are also very steep with up to 12 stairs each, making them difficult to access for all park users but especially for seniors, children, strollers and wheelchairs. We are proposing to replace both of these bridges with new accessible spans made of reinforced concrete.
Project # 17-003
Priority 1 Critical
JustificationAn engineering study on these bridges conducted in 2014 found these bridges to be structurally sound but needing repairs to the steel understructure as well as the concrete steps. Repairs were scheduled for fall of 2015 with funding coming from the Park Dedication Fund. As that date approached it was decided that, since the repairs would not correct the accessibility issues, it would be advisable to completely replace the bridges with new bridges with ramps. AECOM was contracted to study and design these new bridges and their final proposal was completed in December of 2015.
These new bridges would be completely accessible year-round for all park patrons and would negate the need for the current seasonal floating bridge at the amphitheater site. These bridges would make access to both the amphitheater and Putting Course/Paddleboat areas much easier and safer for park patrons and would potentially increase usage of these amenities. The elimination of the seasonal floating bridge would also open up the south lake for paddleboats.
Useful Life
Project Nam Centennial Lakes Pedestrian Bridge Replacement
Category Infrastructure
Type Replace or repair
Contact Tom Shirley
Department Parks: Centennial Lakes Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior740,000740,000Construction
740,000 740,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
370,000370,000Construction Fund: Park Dedication
370,000370,000Unfunded
740,000 740,000Total
Friday, November 18, 2016Page 152
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Concessions area of the Hughes Pavilion is adjacent to the main atrium and is used for the sale of concessions items and ice skate rentals during the winter season. In addition, this area is used by our beverage service for dispensing of beverages for the majority of our special event rentals. This area consists of numerous laminate storage cabinets, countertops and shelving units; all of which are now 25 years old and showing wear.This remodel would involve removing and replacing all of the existing cabinets and countertops with more durable,modern looking pieces. We would also replace the flooring to compliment the new look.
Project # 17-004
Priority 6
JustificationThe continual upkeep and renovation of the Hughes Pavilion is an important part of our special event rental program, where aesthetics play such a vital role in attracting customers.This remodel will help us in attracting and retaining building rental customers, especially wedding and reception clients, with it's more up to date look.
Useful Life
Project Nam Centennial Lakes Remodel Pavilion Concessions Area
Category Buildings
Type Replace or repair
Contact Tom Shirley
Department Parks: Centennial Lakes Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Construction
100,000 100,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
100,000100,000Unfunded
100,000 100,000Total
Friday, November 18, 2016Page 153
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionOur current Skidsteer is a 2006 Bobcat that is used as the main piece of snow removal equipment for the pathway system at Centennial Lakes and the Edina Promenade. This skidsteer is also used extensively is the summer months for hauling landscape materials and lifting heavy objects.We would propose to purchase a new Bobcat and keep our current Bobcat as a secondary unit. This would allow us to finish snow removal quicker, plus would give us a backup when the main Bobcat breaks down.
ENVIRONMENTAL CONSIDERATIONS: We have considered alternative vehicles, however, currently no electric or propane powered equipment has the power to take care of our needs.
Project # 17-005
Priority 6
JustificationA new Bobcat would help us to maintain the walkway system to the level that residents have come to expect. This would keep the pathways safer to use and encourage residents to venture outside in the winter months.
Useful Life
Project Nam Centennial Lakes Bobcat Skidsteer
Category Equipment and Vehicles
Type New
Contact Tom Shirley
Department Parks: Centennial Lakes Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior28,00028,000Vehicles and Equipment
28,000 28,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
28,00028,000Unfunded
28,000 28,000Total
Friday, November 18, 2016Page 154
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe pathway system around Centennial Lakes is made of colored concrete, except for one 1800 foot section of asphalt path on the east side of the lake between Parklawn Avenue and the Maetzold Amphitheater. (Alongside of the putting course) This pathway was installed in 1991 when the park first opened and was put in as a temporary pathway that was intended to be replaced with a concrete pathway as the rest of the park was developed. Due to funding constraints the pathway was never replaced.This pathway is showing its age, with a multitude of cracks, heaves and failures. It has been patched in several areas but is still looking worn and tired. We would propose to remove the old pathway and replace it with a new asphalt path of the same 7 foot width.
Project # 17-006
Priority 5 Important
JustificationThe pathway system at Centennial Lakes Park is one of the most heavily used walkways in Edina. Maintaining this pathway is important to both the aesthetics of the park as well as the safety of the park patrons.
Useful Life
Project Nam Centennial Lakes Pathway Replacement
Category Infrastructure
Type Replace or repair
Contact Tom Shirley
Department Parks: Centennial Lakes Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior90,00090,000Construction
90,000 90,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
90,00090,000Unfunded
90,000 90,000Total
Friday, November 18, 2016Page 155
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe boiler in the West Arena was installed in the 1970's. This boiler supplements the heat reclaim for the West Dehumidifier to heat the spectator areas in the West Arena. Last year there was a crack in a tube in the boiler and we were able to repair the crack, however over time the boiler will continue to degrade to a point of no repair. It is recommended to be on the schedule to be replaced.
We maintain a comfortable temp of 55 degrees in the West Arena which is a perfect temp for the skaters to perform their best.
Project # 17-007
Priority 3 Significant
JustificationIf the boiler were to develop cracks again it would need to be shut down and the space would not have a heat source other than the dehumidifier which currently is unable to keep up with the demand for heat. They system is able to dehumidify the space however is unable to provide heat. Cold days in the winter when the boiler was not operating properly our West Arena was hovering around 35 degrees. Customers at our high school game would be frustrated with 35 degree temps.
Useful Life
Project Nam Braemar Arena West Boiler
Category Buildings
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Construction
150,000 150,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
150,000150,000Unfunded
150,000 150,000Total
Friday, November 18, 2016Page 156
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves concrete sidewalk construction along the west side of Wooddale Avenue between Valley View Road and Fairfax Avenue. The new sidewalk is recommended in the City's adopted Wooddale/Valley View Small Area Plan.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks and pedestrian crossings support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-008
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Sidewalk at Wooddale and Valley View Ridge
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Construction
100,000 100,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
100,000100,000HRA Fund: Centennial Lakes TIF
100,000 100,000Total
Friday, November 18, 2016Page 157
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves improved pedestrian crossings and vehicular movement across and through the intersection of W 66th Street and York Avenue. This work includes the removal of "free rights" at the northwest and southeast corners of the intersection, which will increase pedestrian safety. Additionally, median "refuge islands" will be created where practicable, and thermoplastic pavement markings and pedestrian-activated crossing signals will also be installed.
ENVIRONMENTAL CONSIDERATIONS:0Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
COST CONSIDERATIONS:Some of the costs of reconstruction (e.g. removal of free rights) will be borne by the developer.
Project # 17-009
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam W 66th St & York Ave Intersection Improvements
Category Infrastructure
Type Replace or repair
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior330,000300,000Construction 30,000
300,000 330,000Total 30,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
330,000300,000HRA Fund: Centennial Lakes TIF
30,000
300,000 330,000Total 30,000
Friday, November 18, 2016Page 158
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe scope of this project includes new streetscape elements on York Avenue from 76th Street to 66th Street. Improvements would be developed with Hennepin County and could include median and boulevard plantings.
COST CONSIDERATIONS:Estimated financing is based on anticipated 50% cost sharing from Hennepin County, who has jurisdiction over York Avenue.
Project # 17-010
Priority 7 Desirable
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam York Avenue Landscaping Improvements
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior450,00050,000 400,000Construction
50,000 400,000 450,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
225,00025,000 200,000Construction Fund: Grants & Donations
225,00025,000 200,000HRA Fund: Centennial Lakes TIF
50,000 400,000 450,000Total
Friday, November 18, 2016Page 160
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe scope of this project is to construct a left-turn only lane on eastbound W 69th Street to allow vehicles to turn left into Southdale Center at its westerly entrance from 69th Street. Currently left turns at this location are prohibited. Other related intersection improvements, such as improved geometric design at the entrance to Southdale Center, is also anticipated as part of this project.
Project # 17-011
Priority 7 Desirable
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam W 69th Street Eastbound Left Turn Lane
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000200,000Construction
200,000 200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
200,000200,000HRA Fund: Centennial Lakes TIF
200,000 200,000Total
Friday, November 18, 2016Page 162
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves improved pedestrian crossings and vehicular movement across and through the intersection of Vernon Avenue and Interlachen Boulevard. Work at this intersection includes thermoplastic pavement markings and pedestrian-activated crossing signals and the installation of ADA compliant pedestrian ramps.
This project also includes the upgrading and creation of a new fully-signalized intersection on Vernon Avenue at the northern entrance to Jerry's Foods (to the east)/Wells Fargo Bank (to the west). Work at this intersection includes thermoplastic pavement markings and pedestrian-activated crossing signals and the installation of ADA compliant pedestrian ramps. Additionally, traffic signals will be installed at all four legs of the intersection to allow for left-turning phases on Vernon Avenue. The signals for both intersections above will be timed to improve level of service the area, while balancing the needs of pedestrians wishing to cross Vernon Avenue.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-012
Priority 5 Important
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Vernon Avenue Intersection Improvements
Category Infrastructure
Type Replace or repair
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior750,000750,000Construction
750,000 750,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
750,000750,000HRA Fund: Centennial Lakes TIF
750,000 750,000Total
Friday, November 18, 2016Page 163
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves improved pedestrian crossings and vehicular movement across and through the intersection of W 66th Street and Drew Avenue. This work will create a full intersection, changing the south leg from southbound-only (into Southdale Center) to north- and southbound access at the intersection. Additionally, median pedestrian "refuge islands" will be maintained on the west leg and created on the east leg of W 66th Street, and thermoplastic pavement markings and pedestrian-activated crossing signals will also be installed.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-013
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam W 66th St & Drew Ave Intersection Improvements
Category Infrastructure
Type Replace or repair
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior500,000500,000Construction
500,000 500,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
500,000500,000HRA Fund: Centennial Lakes TIF
500,000 500,000Total
Friday, November 18, 2016Page 165
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe scope of this project includes the reconstruction of approximately 575 feet of Arcadia Avenue, from Eden Avenue to the north edge of the former public works site property. This reconstruction would occur along with the redevelopment of this site, and would include one through-lane in each direction, on-street bicycle lanes and sidewalks on both sides, and on-street parking if necessary and feasible. Potential design options include a "shared street" concept north of the ramp entrance, which may include shared space for vehicles, bicycles and pedestrians and could be closed for events and festivals.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-014
Priority 5 Important
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Arcadia Avenue Improvements
Category Infrastructure
Type Replace or repair
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior451,000451,000Construction
451,000 451,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
451,000451,000HRA Fund: Grandview 2 TIF
451,000 451,000Total
Friday, November 18, 2016Page 167
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe scope of this project includes the creation of a new street north from the intersection of Eden Avenue and Grandview Square to the Jerry's Foods' parking lot, and signalization/ control of the intersection. The new street will be approximately 350 feet in length and will include one lane of traffic in each direction, parking lanes on both sides of the street, and sidewalks with boulevards. Also included will be the reconfiguration of the southern side of Jerry's Foods' parking lot to accommodate the new roadway, and pedestrian crossing improvements at the intersection with Eden Avenue.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks and pedestrian crossings support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-015
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam New Street to Jerry's Foods from Eden Avenue
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior283,000283,000Construction
283,000 283,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
283,000283,000HRA Fund: Grandview 2 TIF
283,000 283,000Total
Friday, November 18, 2016Page 169
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves improved pedestrian crossings and vehicular movement across and through the intersection of W 66th Street and Barrie Avenue. This work will include median pedestrian "refuge islands" on the east and west legs of the intersection, and thermoplastic pavement markings and pedestrian-activated crossing signals. The intersection would also be fully-signalized and controlled.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-016
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam W 66th St & Barrie Ave Intersection Improvements
Category Infrastructure
Type Replace or repair
Contact Bill Neuendorf
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior500,000500,000Construction
500,000 500,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
500,000500,000HRA Fund: Centennial Lakes TIF
500,000 500,000Total
Friday, November 18, 2016Page 171
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe scope of this project includes the removal and replacement of the pedestrian bridge across TH 62 near Rosland Park. The current bridge is not ADA compliant, and bicycle access is difficult as the bridge is accessed by stairs with no ramps. The new slab/girder bridge will include new vertical circulation at each end that will meet ADA requirements and will allow bicyclists to cross TH 62 without getting off of their bicycles. The current bridge is owned by MnDOT. It is anticipated MnDOT would continue to own the bridge after replacement.
ENVIRONMENTAL CONSIDERATIONS:Bicycle and pedestrian facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
COST CONSIDERATIONS:Estimated financing is based on anticipated 80% federal grant (with a 20% local match) via the Metropolitan Council's 2016 Regional Solicitation process.
Project # 17-017
Priority 5 Important
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Rosland Park/TH 62 Pedestrian Bridge Replacement
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,000,00050,000 1,950,000Construction
50,000 1,950,000 2,000,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
200,00025,000 175,000HRA Fund: Centennial Lakes TIF
200,00025,000 175,000PACS Fund: Utility Franchise Fees
1,600,0001,600,000Unfunded
50,000 1,950,000 2,000,000Total
Friday, November 18, 2016Page 173
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the extension of existing bicycle facilities on Valley View Road from Brookview Avenue, under the TH 62 bridge, south to W 66th Street. The existing on-street bicycle lanes will transition to off-street, paved facilities north of Brookview Avenue. This off-street facility will continue south to the intersection with W 65th Street/TH 62 off ramp, where it will transition back to on-street, buffered (by pavement markings) bike lanes. These lanes will continue to W 66th Street. The project scope also includes the removal of the "free right" turn from westbound 66th Street to northbound Valley View Road. Pedestrian crossing improvements will also be made throughout the project area.
ENVIRONMENTAL CONSIDERATIONS:Bicycle facilities support non-motorized transportation, which can replace vehicular travel,resulting in a reduction of greenhouse gas emissions.
COST CONSIDERATIONS:Estimated financing is based on anticipated 80% federal grant (with a 20% local match) via the Metropolitan Council's 2016 Regional Solicitation process.
Project # 17-018
Priority 4
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Valley View Rd Bicycle Facility Improvements
Category Infrastructure
Type Expand or enhance
Contact Chad Millner
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,000,00050,000 1,950,000Construction
50,000 1,950,000 2,000,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
400,00050,000 350,000HRA Fund: Centennial Lakes TIF
1,600,0001,600,000Unfunded
50,000 1,950,000 2,000,000Total
Friday, November 18, 2016Page 175
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction of Municipal State Aid designated West 76th Street from France Avenue to Xerxes Avenue and Edinborough Way from West 76th Street to Minnesota Drive. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian and traffic facility improvements. The project will meet current State Aid requirements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new constructionprojects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-019
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam West 76th Street/Edinborough Way Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior4,033,9334,033,933Construction
4,033,933 4,033,933Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
2,510,1332,510,133Construction Fund: Municipal State Aid
Friday, November 18, 2016Page 177
Capital Improvement Plan
City of Edina, MN
2017 2021thru
627,533627,533Construction Fund: Special Assessments
144,356144,356Utility Fund: Sewer
384,455384,455Utility Fund: Storm
367,456367,456Utility Fund: Water
4,033,933 4,033,933Total
Friday, November 18, 2016Page 178
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction of Municipal State Aid designated Blake Road from Spruce Road to Scriver Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian and traffic facility improvements. The project will meet current State Aid requirements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new constructionprojects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-020
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Blake Road Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior4,834,4164,834,416Construction
4,834,416 4,834,416Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
2,975,1982,975,198Construction Fund: Municipal State Aid
Friday, November 18, 2016Page 179
Capital Improvement Plan
City of Edina, MN
2017 2021thru
743,799743,799Construction Fund: Special Assessments
53,09553,095PACS Fund: Utility Franchise Fees
171,102171,102Utility Fund: Sewer
455,685455,685Utility Fund: Storm
435,537435,537Utility Fund: Water
4,834,416 4,834,416Total
Friday, November 18, 2016Page 180
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction of a retaining wall along Municipal State Aid designated Valley View Road. The wall exists behind the properties of 5829 and 5825 Creek Valley Road. The existing City-maintained natural stone wall that holds up the roadway embankment will be replaced with a prefabricated, modular block retaining wall. The project will meet current State Aid requirements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:
Proper construction and maintenance of this wall will help protect and extend the life of Valley View Road from Susan Avenue to Lois Lane and the public utilities underneath.
Project # 17-021
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Valley View Rd Rear Yard Retaining Wall
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000200,000Construction
200,000 200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
200,000200,000Construction Fund: Municipal State Aid
Friday, November 18, 2016Page 181
Capital Improvement Plan
City of Edina, MN
2017 2021thru
200,000 200,000Total
Friday, November 18, 2016Page 182
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project is collaborative project between the City of Edina, City of Minneapolis, and Hennepin County. It will install a new traffic signal at the intersection of 60th Street and Xerxes Avenue to improve traffic and pedestrian operations. It will be interconnected with the traffic signals at Xerxes Avenue and Highway 62 to ensure smooth traffic operations.
ENVIRONMENTAL CONSIDERATIONS:Carbon: Creating ways to effectively move traffic through intersections reduces stopping time and idling engines. This reduces the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
COST CONSIDERATIONS:Each agency will be providing funding for the project per Hennepin County's cost share policy.
Project # 17-022
Priority 1 Critical
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam 60th Street and Xerxes Ave Traffic Signal
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000200,000Construction
200,000 200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
200,000200,000Construction Fund: Municipal State Aid
200,000 200,000Total
Friday, November 18, 2016Page 183
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Waterman Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS: Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-023
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Interlachen Park B Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior389,553389,553Construction
389,553 389,553Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
189,674189,674Construction Fund: Special Assessments
Friday, November 18, 2016Page 185
Capital Improvement Plan
City of Edina, MN
2017 2021thru
38,64338,643Utility Fund: Sewer
112,663112,663Utility Fund: Storm
48,57348,573Utility Fund: Water
389,553 389,553Total
Friday, November 18, 2016Page 186
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Hansen Road and Windsor Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-024
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Grandview A Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior891,959891,959Construction
891,959 891,959Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
423,427423,427Construction Fund: Special Assessments
Friday, November 18, 2016Page 187
Capital Improvement Plan
City of Edina, MN
2017 2021thru
86,26686,266Utility Fund: Sewer
273,831273,831Utility Fund: Storm
108,435108,435Utility Fund: Water
891,959 891,959Total
Friday, November 18, 2016Page 188
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Circle East, Circle West, Cooper Avenue, Cooper Circle, Division Street, Orchard Lane, and Spur Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-025
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Hilldale Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,712,4722,712,472Construction
2,712,472 2,712,472Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,226,8891,226,889Construction Fund: Special Assessments
Friday, November 18, 2016Page 189
Capital Improvement Plan
City of Edina, MN
2017 2021thru
128,002128,002PACS Fund: Utility Franchise Fees
249,958249,958Utility Fund: Sewer
793,431793,431Utility Fund: Storm
314,192314,192Utility Fund: Water
2,712,472 2,712,472Total
Friday, November 18, 2016Page 190
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Bernard Place, Code Avenue, Dale Avenue, Hansen Road, Melody Lake Drive, Melody Lane, West 56th Street, and West 57th Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new constructionprojects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-026
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Melody Lake A Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior3,805,2843,805,284Construction
3,805,284 3,805,284Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,780,6961,780,696Construction Fund: Special Assessments
Friday, November 18, 2016Page 191
Capital Improvement Plan
City of Edina, MN
2017 2021thru
54,20554,205PACS Fund: Utility Franchise Fees
362,787362,787Utility Fund: Sewer
1,151,5791,151,579Utility Fund: Storm
456,017456,017Utility Fund: Water
3,805,284 3,805,284Total
Friday, November 18, 2016Page 192
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Berne Circle, Grove Circle, Olinger Road, and Sherman Circle) within the project area. This includes replacing the entire pavement surface; repair, replacement or addition of curb and gutter; and major maintenance or upgrade of public utilities (watermain, sanitary sewer, and storm sewer). Targeted installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements will also be considered.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new constructionprojects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-027
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Countryside G Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,446,2671,446,267Construction
1,446,267 1,446,267Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
598,208598,208Construction Fund: Special Assessments
Friday, November 18, 2016Page 193
Capital Improvement Plan
City of Edina, MN
2017 2021thru
91,92591,925PACS Fund: Utility Franchise Fees
121,875121,875Utility Fund: Sewer
286,862286,862Utility Fund: Storm
347,397347,397Utility Fund: Water
1,446,267 1,446,267Total
Friday, November 18, 2016Page 194
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe desired useful life of a Zamboni is 10,000 hours, which equates to about 10 years. We have historically held on to Zamboni’s for 13-17 years. With the replacement of this Zamboni the machines we use on a daily basis will be 2010, 2012, 2014 and 2021. The Zamboni this would replace is a 2001. While this is our back up machine, it is also used during the winter months while the 2014 resurfaces the backyard rink. After this machine is replaced we would need another one starting in 2025.
Project # 17-028
Priority 4
JustificationZamboni's are a necessity to ice arena operations. When a Zamboni ages you will start to see imperfections in the ice due to the machine not operating properly. During the winter months and the Backyard Rink is in operation we use all four Zamboni's, therefore it is very important that all machines are in proper working condition.
Useful Life
Project Nam Braemar Arena Zamboni
Category Equipment and Vehicles
Type Replace or repair
Contact Ann Kattreh
Department Parks: Arena
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Construction
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Unfunded
120,000 120,000Total
Friday, November 18, 2016Page 195
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace the carpet in both the golf shop and administration offices. The update should be consistent with the modifications and changes made to our Academy 9 building and clubhouse. Because the spaces flow together it makes sense to do carpet in both areas and to have the carpet consistent in both spaces and compatible with what is in the other aforementioned areas.
Approximately 300 sq. yards to cover golf shopApproximately 135 sq. yards to cover offices
Project # 17-029
Priority 3 Significant
JustificationThe current carpet in both areas was installed in February, 2004. It is dated and the entry is soiled past the ability to get clean. In addition, it will coincide with the pro shop counter and fixture updates needed.
Replacement needed to keep facility up to acceptable standards for a premier facility.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Shop & Admin Carpet
Category Buildings
Type Replace or repair
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior17,00017,000Installation/Maintenance
17,000 17,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
17,00017,000Unfunded
17,000 17,000Total
Friday, November 18, 2016Page 196
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Braemar Golf Cart Storage areas need to be upgraded to house an all electric golf cart fleet. A new fleet of golf carts will be leased in 2018 and the present electrical system in the clubhouse cannot accommodate the electrical requirements. The existing fleet is a mix of gas and electric carts. The vast majority of golf patrons at Braemar prefer an electric golf cart over a gas model. Electric carts are more energy efficient, produce less pollutants and are substantially quieter than their gas counterpart.
ENVIRONMENTAL CONSIDERATIONS:Electric carts are more energy efficient, produce less pollutants and are substantially quieter than their gas counterpart.
Project # 17-030
Priority 2
JustificationUpgrading the current golf cart storage areas is required to transition from a hybrid, gas/electric golf cart fleet to an all electric golf cart fleet.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Cart Storage Upgrade
Category Buildings
Type Expand or enhance
Contact Joe Abood
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Construction
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Construction Fund: Available Funding
25,000 25,000Total
Friday, November 18, 2016Page 197
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Braemar Clubhouse Lower Level is presently under-utilized because of its floor plan as well as its condition.
The layout for the restrooms, locker rooms and lounges are designed in a manner that does not promote utilization.
Restrooms and shower facilities as well as the plumbing infrastructure need to be repaired and renovated.
The lower level carpet is passed its useful lifespan and needs to be replaced.
Furniture, tables and chairs are all dated and need to be replaced.
Wallpaper is dated and needs to be replaced or painted.
Project # 17-031
Priority 5 Important
JustificationRenovation is needed to keep facility up to acceptable standards for a premier facility.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Clubhouse Lower Level
Category Buildings
Type Expand or enhance
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior200,000200,000Construction
200,000 200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
200,000200,000Unfunded
200,000 200,000Total
Friday, November 18, 2016Page 198
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionInstall 2 new fountains in the ponds near the main entry at Braemar Golf Course. These ponds are filled with algae, duck weed and other organic material that create a negative aesthetic entrance to the Braemar Golf Facilities. One pond is located north and the other pond is located west of the intersection of John Harris Drive and Hillary Lane. These ponds are features on the new Academy Par 3 golf course. This project would include the installation of new wiring and a control panel for each fountain.
ENVIRONMENTAL CONSIDERATIONS:Installing fountains can help reduce chemical use. The wave action caused by the spray pattern disrupts algae mats and discourages mosquito breeding.
Project # 17-032
Priority 6
JustificationAdding fountains will enhance the appearance of the main entrance to the golf course. Customers that use this entrance include golfers, banquet room customers and guests at "Tin Fish". It will also be visible to walkers and commuters that use Hillary Lane.
In strategic alignment with Edina’s mission statement to "offer premier public facilities".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Entry Pond Fountains
Category Parks
Type New
Contact Tom Swenson
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Vehicles and Equipment
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Braemar Memorial Fund Donations
25,000 25,000Total
Friday, November 18, 2016Page 199
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionUpgrade and enhance the exterior lighting along the new patio and sidewalk at the front of Braemar clubhouse. New lighting would improve safety, save energy and enhance the new patio seating area in front of "Tin Fish".
ENVIRONMENTAL CONSIDERATIONS:This project includes replacing 9 existing HID bollard lights with energy efficient LED lighting.
Project # 17-033
Priority 4
JustificationMore lighting is required in the front of the entry because of the increase in users of the clubhouse in the evening. The existing exterior bollard lights were installed in 1988. Repair parts for these lights are difficult to locate. The supports that anchor the lights are failing and require frequent repairs. These lights consume more electricity than new LED light fixtures.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system"..
Useful Life
Project Nam Braemar Golf Landscape Lighting Replacement
Category Equipment and Vehicles
Type Expand or enhance
Contact Tom Swenson
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Vehicles and Equipment
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Unfunded
25,000 25,000Total
Friday, November 18, 2016Page 200
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPurchase furniture for the new restaurant north patio area. This patio was added with the 2015 CIP Clubhouse/Tin Fish renovation.
Project # 17-034
Priority 5 Important
JustificationIn strategic alignment with Edina’s mission statement to "offer premier public facilities".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Restaurant Patio Furniture
Category Parks
Type New
Contact Joe Abood
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior24,00024,000Vehicles and Equipment
24,000 24,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
24,00024,000Braemar Memorial Fund Donations
24,000 24,000Total
Friday, November 18, 2016Page 201
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionConstruct new trellis on the restaurant north patio area. The planned trellis was removed from the 2015 CIP Roof & Siding renovation design as part of the value engineering process when the project was projected to be over budget. The new trellis will add an attractive aesthetic feature to the main entrance to the Braemar Clubhouse.
Project # 17-035
Priority 7 Desirable
JustificationIn strategic alignment with Edina’s mission statement to "offer premier public facilities".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Restaurant Patio Trellis
Category Parks
Type New
Contact Joe Abood
Department Parks: Golf Course
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Vehicles and Equipment
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Braemar Memorial Fund Donations
30,000 30,000Total
Friday, November 18, 2016Page 202
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionRenovate existing Braemar Clubhouse golf shop. The golf shop counter would be relocated to the NW corner of the space to provide for administrative efficiencies with the view of the first tee and ending 9th green and to better utilization of the pro shop retail space for improved marketing of merchandise for sale. Old retail fixtures will be replaced. The current fixtures are dated and inefficient (20+ years old). A better designed space will be more efficient for staff, customers and will increase shop sales.
Project # 17-036
Priority 3 Significant
JustificationThe present golf shop is not configured to optimize the customer experience or to promote retail sales. A new counter and new retail fixtures will give an updated look which will have an immediate return on investment. The update will be consistent with the "brand" that has been created in the Tin Fish, Clubhouse public area, Banquet Room and Golf Academy building.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Pro Shop Renovation
Category Buildings
Type Expand or enhance
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Construction
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Unfunded
30,000 30,000Total
Friday, November 18, 2016Page 203
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPurchase a new skid steer loader that will replace one purchased in 2012. This loader is unique because of it's track system that allows it to maneuver on the grass without leaving ruts. This loader is used for snow removal, winter trail grooming, loading soil and removing tree debris. This vehicle purchased in 2012 will be 9 years old in 2020. As this vehicle continues to age, it requires more frequent repair and is not available for the grounds crew. This also reduces the time that the mechanic can spend on the grounds helping to improve the course conditions.
Project # 17-037
Priority 7 Desirable
JustificationReplacement needed to keep maintenance fleet in working condition and up to acceptable standards for a premier facility. The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Skidsteer Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior50,00050,000Vehicles and Equipment
50,000 50,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00050,000Unfunded
50,000 50,000Total
Friday, November 18, 2016Page 204
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace current weather alert system with new lightening and severe weather alerting system throughout Braemar Golf Course facility. Current system does not detect weather or lightening. It is manually activated by an employee, based on their interpretation of current and pending weather conditions. New system is a comprehensive and intelligent severe weather alerting system providing improved safety measures for customers and staff.
Project # 17-038
Priority 3 Significant
JustificationCurrent weather alert system is 14 years old and does not have the capability to detect approaching severe weather or lightening. The system is an audible system only when manually engaged by an employee.
New lightening detection and severe weather alert system is fully automatic. It detects localized lightening and severe weather, sends severe weather alerts to staff and will automatically sound alerts outside for mass notification throughout the golf facility to seek shelter. Staff will be given an all clear when the weather has cleared the area and is safe for play to resume.
Some benefits include increased public and employee safety, enhanced customer experience with live, local weather conditions and radar, improved operations and event management. Allows staff to make accurate, weather related decisions to safeguard customers and employees. Able to receive the most accurate lightening alerts. Able to make informed event assessments. Receive and disseminate severe weather alerts immediately. Provides 24/7 weather monitoring.
Replacement needed to keep facility up to acceptable standards for a premier facility.
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Severe Weather Alert System
Category Technology
Type Expand or enhance
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior18,00018,000Vehicles and Equipment
5,0005,000Software
23,000 23,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
23,00023,000Unfunded
23,000 23,000Total
Friday, November 18, 2016Page 205
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionOur current 2005 Chevrolet 4x4 pickup truck was originally scheduled to be replaced in 2015 but was removed from our CIP due to funding constraints, plus we had determined that we could get a few more years of service from it. The truck will have been in service for nineteen years in 2018 and will be ready for replacement.
Project # 17-039
Priority 4
JustificationThis vehicle is used for plowing the park walkways and ice rink during the winter months, and for general park use year round. The vehicle is used for hauling park supplies, equipment and landscape material.
Useful Life
Project Nam Centennial Lakes Vehicle Purchase
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Shirley
Department Parks: Centennial Lakes Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior28,00028,000Vehicles and Equipment
28,000 28,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
28,00028,000Unfunded
28,000 28,000Total
Friday, November 18, 2016Page 207
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis renovation would include the replacement of deck pads, thick foam pipe covering, safety netting throughout Adventure Peak, and update to the Toddler area. Adventure Peak was built in 2003 and the foam pipe covering is original and is starting to wear out and tear due to heavy use. The foam pipe covering and safety netting has been replaced in a several spots and is not uniform throughout the structure, which detracts from the esthetics of the structure. The Toddler area is becoming increasingly popular and does not have enough events to accommodate the number of users.
Project # 17-040
Priority 3 Significant
JustificationEach year thousands of children play in Adventure Peak and the revenue is over $600,000 annually. Adventure Peak attracts people to Edina from all over the Twin Cities metro area and is one of the most used indoor play structures in the country. Exterior foam and soft deck pads wear out with use. The thick foam padding covers all of the structural piping throughout Adventure Peak. Kids hang on and bump into the pads. Replacing deck pads and foam pipe covering is essential to maintaining safety standards on the Peak. Edinborough Park has a reputation in the community to be a safe facility for families to enjoy.
The Toddler Area is geared toward children 4 years old and younger. It is a designated area for young children and their parents. We have space available to add new features that would be age appropriate and allow families with young children to participate in sensory and motor activities together.
Useful Life
Project Nam Edinborough Park Adventure Peak Renovation
Category Parks
Type Replace or repair
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior29,30029,300Vehicles and Equipment
29,300 29,300Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
29,30029,300Unfunded
29,300 29,300Total
Friday, November 18, 2016Page 208
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionEdinborough Park has 15 pieces of fitness equipment that are in need of replacement. The treadmills, ellipticals, rowers and strength equipment is out of date and breaking down more frequently. Parts and service for these old machines is becoming much more expensive and difficult to find.
The track is used by our association partners (Corporate Center, Brookdale Senior Living, Marriott Residence Inn, and Edinborough Townhomes) as well as our annual members and guests who purchase a daily admission.
To maximize the impact of this project, it should be coordinated with replacing the track flooring and the locker room expansion.
Project # 17-041
Priority 3 Significant
JustificationReplacing the fitness equipment at Edinborough Park is needed because our equipment is so old and requires constant maintenance. We don't actively market Pool & Track memberships at this time due to the lack of equipment.
The Marriott Residence Inn is one of our association partners that pays maintenance fees to us and they do not have exercise equipment or a swimming pool. Our agreement with them includes pool and track privileges for their guests and we must maintain it to a standard that they would be proud of too. Currently, the selection, condition and availability of the equipment does not meet their standards. In addition, our other association partners also have privileges to use this equipment and some pieces break down frequently.
With Brookdale Senior Living as another association partner, we could better serve their residents with updated equipment specifically geared towards older adults.
To maximize the impact of this project, it should be coordinated with replacing the track flooring and the locker room expansion.
Useful Life
Project Nam Edinborough Park Fitness Equipment Replacement
Category Equipment and Vehicles
Type Replace or repair
Contact Patty McGrath
Department Parks: Edinborough Park
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior72,00072,000Vehicles and Equipment
72,000 72,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
72,00072,000Construction Fund: Available Funding
72,000 72,000Total
Friday, November 18, 2016Page 209
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionInstall automation for the roof top units that heat and cool Edinborough Park. This automation would allow more precise control of the units, remote control of the units, and detailed information when there is a problem, thus saving time in problem solving and keeping the park heating and cooling system operating at it's optimal levels. The park is nearly one acre in size and it is critical for us to maintain proper indoor temperatures for all of our guests.
Project # 17-042
Priority 3 Significant
JustificationThree roof top units provide all of the heating and cooling for the park. When we experience an outage or mechanical problem, we generally do not know immediately. By the time we do know something is wrong, the problem is generally affecting our guest experience in some manner. Annually, the budget for heating and cooling is over $100,000. The detailed information that automation would provide would be extremely helpful in trouble shooting the problem and determining if we can fix it, or if we need to expedite a call to our maintenance contractor.
Useful Life
Project Nam Edinborough Park Automation for Roof Top Units
Category Technology
Type New
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Construction
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Unfunded
30,000 30,000Total
Friday, November 18, 2016Page 211
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis was an approved CIP in 2014 to be funded by the Edinborough Fund. The project never took place as we evaluated the level of the Edinborough Fund balance.
Replace the tile on the walls in the pool area and the deck tile. The tile is original to the park and was installed in 1987. The pool is used by our Association Partners (ie: Corporate Center, Brookdale Senior Living, Residence Inn, Edinborough Townhome owners and Edina Swim Club), Community Education, TRIA Orthopedics, Pool & Track members and daily users.
The cost of the project has changed since it's initial proposal due to the rising construction costs.
Project # 17-043
Priority 4
JustificationThe pool area needs an update to be considered a premier Edina facility. The deck and wall tile is original to the park and is almost 30 years old. There are several cracked and damaged pieces along the east wall and buckled tile along the north wall. As pieces of tile continue to crack and break off it presents a safety hazard for our guests who are walking in their bare feet. We have replaced several larger areas of deck tile that are discolored and it does not look esthetically pleasing.
Since our partnership with the Edina Swim Club was formalized in 2012, the number of people on the deck in the pool area has increased significantly and is taking a toll on the outdated tile.
Useful Life
Project Nam Edinborough Park Pool Tile Replacement
Category Buildings
Type Replace or repair
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior210,000210,000Construction
210,000 210,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
210,000210,000Unfunded
210,000 210,000Total
Friday, November 18, 2016Page 212
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace furniture on both the south deck and the west deck. The furniture is approximately eight years old . There is currently 11 sets of tables and chairs on the west deck and 7 on the south deck along with 4 cushioned rockers. Both decks have a high volume of traffic and it has continued to increase over the years.
Since the time the current furniture was purchased the traffic on the deck area has increased and customers are more inclined to come solely to eat and spend significantly more time there.
Project # 17-044
Priority 5 Important
JustificationThe current furniture has held up reasonably well given the high traffic on the decks. However, the harsh weather in Minnesota has taken its toll on it. Several tables and most chairs have paint chips. In addition, when we increased the amount of furniture on the deck the original tables and chairs were no longer available so there are a few different styles. The deck space is tired and new furniture should reflect our updated brand as well as increased functionality.
Replacement needed to keep facility up to acceptable standards for a premier facility.
In strategic alignment with Edina’s mission statement to "offer premier public facilities".
The National Golf Foundation (NGF) report also confirms justification "NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system".
Useful Life
Project Nam Braemar Golf Patio Furniture
Category Parks
Type Replace or repair
Contact Joe Abood
Department Parks: Golf Course
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior77,00077,000Vehicles and Equipment
77,000 77,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
77,00077,000Unfunded
77,000 77,000Total
Friday, November 18, 2016Page 213
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis was an approved CIP in 2014 to be funded by the Edinborough Fund. The project never took place as we evaluated the level of the Edinborough Fund balance.
Renovate and expand both the men's and women's locker rooms. The locker rooms are original to the park and have always been significantly undersized for the needs of our customers. We would convert a storage area to create a new locker room. The result would be doubling the size of both locker rooms.
ENVIRONMENTAL CONSIDERATIONS: During reconstruction of the locker rooms we would replace existing toilets and sink fixtures with automated fixtures that would save money and water. We would also replace paper towel dispensers with automated hand dryers that will reduce paper cost and unsightly mess caused by paper towels.
The cost of the project has changed since it's initial proposal due to rising construction costs and the need to employ architectural/engineering services to ensure we meet ADA requirements in this renovation.
To maximize the impact of this project, it should be coordinated with replacing the fitness equipment, and replacing the track floor.
Project # 17-045
Priority 5 Important
JustificationThe locker rooms are original to the park. We continually receive feedback that the locker rooms are too small to accommodate our customers. The locker rooms can comfortably accommodate 6-8 people, with the dressing areas only able to accommodate 4 or 5. We have water exercise classes with 20 participants. The Edina Swim Club has over 30 kids in some levels that will need the locker rooms. We have entered into an agreement with the Edina Swim Club to be the home of their club, hosting approximately 4hours of practice time daily, a minimum of five days/week. In addition, we would need to bring the locker rooms up to ADA compliance during the renovation.
Our goals is to continue improving and stabilizing the cost recovery percentage for Edinborough Park to 90-100%. To accomplish this goal it's essential we increase usage of the facility thus requiring adequate facilities to accommodate our customers. Expanding the locker rooms would enable us to accomplish the following resulting in increased revenue:
- Update the look of the locker room facilities to appeal to the public- Improve the comfort of the locker rooms by improving air quality and water drainage- Accommodate larger groups, such as rentals and group reservations- Offer additional programming opportunities - water exercise, water zumba, yoga, etc..
This project re-purposes an aging infrastructure and allows us to provide a level of service that sets Edina apart from other communities.
Useful Life
Project Nam Edinborough Park Locker Room Expansion
Category Buildings
Type Expand or enhance
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior35,00035,000Planning and Design
595,000595,000Construction
630,000 630,000Total
Friday, November 18, 2016Page 214
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
630,000630,000Unfunded
630,000 630,000Total
Friday, November 18, 2016Page 215
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionImprove pool lighting to increase visibility and safety for guests. The ceiling of the pool area is open to the second floor track area and this creates difficulty lighting the center of the pool area properly. The current lighting consists of eighteen small square box lights located under the track, and on the outside perimeter of the pool, but they do not provide lighting to the center of the pool.
The pool area does receive some natural light, but not enough to make a significant difference and definitely not during the evening.
ENVIRONMENTAL CONSIDERATIONS:Through this lighting system upgrade, there is potential to receive a rebate, reduce electrical costs and install longer lasting bulbs.
Project # 17-046
Priority 3 Significant
JustificationThe lighting in the pool is an important safety feature for everyone using the pool. Since we formalized our partnership with the Edina Swim Club in 2012, their staff spends approximately 25 hours/week in the pool area and they find the lighting conditions difficult. It is quite dim in certain areas. Improving the lighting would include hiring a lighting designer for this unique area and installing natatorium rated lights.
Useful Life
Project Nam Edinborough Park Pool Lighting System Upgrade
Category Buildings
Type Expand or enhance
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,8001,800Planning and Design
31,50031,500Construction
33,300 33,300Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
33,30033,300Unfunded
33,300 33,300Total
Friday, November 18, 2016Page 216
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis was an approved 2013 CIP. The project was never completed because the scope changed dramatically as more information became available about the structural deterioration. The southeast plaza is the primary entrance to the park from the parking ramp and it has been deteriorating for several years. Although temporary repairs were made to alleviate the possibility of trips and falls in the immediate area, a total reconstruction of this area is necessary to alleviate other structural issues and create a positive first impression for guests visiting the park and entering the Corporate Center.
As a direct result of this deterioration, water seeps into the park entryway, loading dock and the hallway inside the park that is underneath the plaza. Structural issues that need to be addressed include damage to the lower level loading dock, reconstruction of stairs between the loading dock and parking garage, reconstruction of the driveway to redirect the drainage issues and a more appropriate "roof" section that would have a waterproof barrier keeping water from coming into the building.
In 2017, Edinborough Park will celebrate it's 30th anniversary and this high traffic entrance needs to reflect the grandeur of the facility, while correcting significant structural issues.
Project # 17-047
Priority 2
JustificationEach year Edinborough Park has more than 125,000 visitors and the southeast plaza is the primary entrance from the parking ramp. This project was originally submitted as a CIP in 2013 when it was thought to be a simple concrete repair project. With further research, it was discovered that it was not just the concrete, but that the project needed significant structural improvements to alleviate serious drainage issues negatively impacting other parts of Edinborough Park.
One of the most serious side effects of the leaking is damage to the interior hallway/tunnel area. Even during light rain showers or snow melt, water pours into the tunnel. The leaking water has corroded several electrical conduits and creates slipping hazards for staff. Repairing this correctly would prevent further deterioration and damage.
Bolton and Menk, Inc. was hired as consulting engineers to help determine the actual scope of the project. The project now includes:1. The need to repair the footing of the lower level loading dock, along with associated driveway reconstruction to redirect the drainage that has contributed to the current problem. 2. Reconstruction of the stairs between loading dock and parking garage to facilitate nearby drain pipe discharge extension.3. The need for a more comprehensive replacement of railings, including integral concrete wall caps along the plaza, pedestrian bridge and stairwell. 4. The need to design a more appropriate roof section that captures water from building downspouts.
The temporary repairs have alleviated the concern that a guest might trip and fall, however those repairs do not address the increasingly dangerous conditions inside outside the facility. The wall under the pedestrian bridge is deteriorating at a more rapid pace and now drops debris (pieces of bricks, cement grout, etc..) daily.
Useful Life
Project Nam Edinborough Park SE Plaza Entrance Reconstruction
Category Buildings
Type Replace or repair
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Planning and Design
320,000320,000Construction
350,000 350,000Total
Friday, November 18, 2016Page 217
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
350,000350,000Unfunded
350,000 350,000Total
Friday, November 18, 2016Page 218
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis was an approved CIP in 2015 that was not completed.
Replace the track floor with a similar rubber surface. The useful life is anticipated to be 20 years. The current track surface was installed nearly 30 years ago, when the facility opened in 1987.
Project # 17-048
Priority 3 Significant
JustificationThe Parks and Recreation Facilities and Services Needs Assessment Survey confirmed that having indoor exercise facilities and an indoor running/walking track is important to the residents of Edina. The track has experienced significant wear over the years. Portions of the track surface are wearing quite thin causing potential tripping hazards. The current surface is a deterrent to many people.
The Marriott Residence Inn is one of our association partners that pays maintenance fees to us and they do not have exercise equipment or a swimming pool. Our agreement with them includes pool and track privileges for their guests and we must maintain it to a standard that they would be proud of too.
To maximize the impact of this project, it should be coordinated with replacing the fitness equipment and the locker room expansion.
Useful Life
Project Nam Edinborough Park Track Floor Replacement
Category Buildings
Type Replace or repair
Contact Patty McGrath
Department Parks: Edinborough Park
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior65,00065,000Construction
65,000 65,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
65,00065,000Unfunded
65,000 65,000Total
Friday, November 18, 2016Page 219
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPolice, Fire, and Public Works departments use the State of Minnesota Allied Radio Matrix for Emergency Response (ARMER) radio system to communicate between departments, with other agencies, and dispatch. This network of radios is an essential tool to perform work functions. Radios are the primary form of communication to dispatch emergency and non-emergency calls for service to responders.
This equipment is on our current replacement schedule and has been scheduled in four phases beginning in 2014. This purchase represents the final phase and will replace Public Works radios. The current radios will no longer function on the ARMER system in 2019 and replacement is mandatory.
ENVIRONMENTAL CONSIDERATIONS:Motorola has a program in place called the Environment, Health & Safety (EHS) management system that sets targets and drives continuous improvement in safety, pollution prevention and resource conservation throughout the design, manufacturing and distribution of products. Initiatives include reduction of printed documentation, reduced packaging, use of environmentally friendly materials, improved battery designs, and battery recycling programs.
COST CONSIDERATIONS:This is a Public Works expense with purchasing managed by the police department.
Project # 17-049
Priority 1 Critical
JustificationMotorola (radio manufacture) and Hennepin County (radio network operator) support ARMER public safety radios for 10 years after purchase and provide network support up to an additional 5 years after the product has been discontinued. The Public Works radio fleet represents the last of our original radio equipment from 2004 and will become obsolete in 2019. The police department manages purchasing and operations of the radio system.
Useful Life
Project Nam ARMER Radios (Public Works)
Category Equipment and Vehicles
Type Replace or repair
Contact Aaron White
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior175,000175,000Vehicles and Equipment
175,000 175,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
175,000175,000Construction Fund: Equipment Levy
175,000 175,000Total
Friday, November 18, 2016Page 220
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Edina Police Department Investigations Unit has one detective trained to conduct digital forensic examinations. The forensic examiner utilizes specialized equipment and software to view and exam information that is present, hidden, encrypted, compressed, and/or deleted on devices including: computer towers, laptops, external/internal hard drives, cellular phones, global positioning systems (GPS), tablets, and other digital media. Digital products are ever changing as technology advances at an exponential rate. As digital consumer electronics advance technologically, the forensic equipment used to examine them must keep pace.
Purchase a computer forensic workstation in 2018.
ENVIRONMENTAL CONSIDERATIONS:
A review of the major manufactures of computer forensic towers did not reveal any specific Eco/Environmentally friendly product. At this time, we are not aware of any specific eco-friendly alternatives for the forensic tower.
The dell monitors are energy star rated, and have a gold EPEAT rating. Additionally, the monitors are TCO Certified. A TCO Certified display meets life cycle sustainability criteria such as socially responsible manufacturing, environment and ergonomics / health and safety.
COST CONSIDERATIONS:Annual/reoccurring costs associated with software licensing fees are $11,620.00. The bulk of these fees are currently covered by the United States Secrete Service, but are not anticipated to be paid for indefinitely. The software is necessary for forensic examinations.
Project # 17-050
Priority 3 Significant
JustificationSince 1991, when the World Wide Web was created, the use of the Internet and computer based devices has seen a rapid growth in criminal uses through email, instant messaging, online chat rooms, social networking, and of networked computers and cellular devices. These devices create and store huge amounts of data in their memory or log files. Even technology savvy users might not know how to delete multiple trails of evidence creating a vast amount of incriminating information related to criminal investigations. The soaring use of the Internet and technology leaves our community at great risk for being victimized through electronic devices. Cyber attacks; hacking, and computer-based criminal activity are costing businesses billions of dollars each year. Computer forensics involves the identification, extraction, preservation, and documentation of computer based evidence stored as data. Private industry has taken this threat seriously for years but law enforcement is just starting to position for computer forensics.
Currently, Edina Police Department forensic examinations have assisted in the investigation and/or prosecution of crimes related to fraud, burglary, domestic violence, stalking, crimes against children, and narcotics violations.
Useful Life
Project Nam Police Computer Forensic Equipment
Category Technology
Type New
Contact Tim Olson
Department Police
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior24,15424,154Vehicles and Equipment
24,154 24,154Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
24,15424,154Unfunded
Friday, November 18, 2016Page 222
Capital Improvement Plan
City of Edina, MN
2017 2021thru
24,154 24,154Total
Friday, November 18, 2016Page 223
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplacement of aging automated external defibrillators (AEDs) that are outfitted in all patrol and traffic squad cars.
Project # 17-051
Priority 1 Critical
JustificationEdina Police Officers respond to all medical calls within the city. Often, they arrive on scene prior to paramedics and are therefore essential when the medical call could potentially result in death, such as cardiac arrest. The majority of squad cars that can arrive on scene are equipped with automated external defibrillators (AEDs), but some cars are not. AEDs are proven to be critical tools for survival during cardiac arrest.
The Edina Police Department currently has thirteen AEDs in use. Eleven of the AEDs are LifePak (model 500) which were purchased and/or donated to the department in 2003. Research suggests the average lifespan of an AED is between five and eight years. Three out of four traffic cars do not currently carry AEDs. Traffic officers often respond to patrol calls which include medical calls for service so these squad cars should also be equipped with AEDs.
There are a total of 16 police/traffic cars. One traffic car has a new Life Pak 1000. Another squad car is oufitted with an AED that is only three years old. That would leave a total of 14 new AEDs that need to be purchased at this time.
Useful Life
Project Nam Police AED Replacements
Category Equipment and Vehicles
Type Replace or repair
Contact Dan Conboy
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior21,00021,000Vehicles and Equipment
21,000 21,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
21,00021,000Construction Fund: Available Funding
21,000 21,000Total
Friday, November 18, 2016Page 224
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionCurrently the Edina Police Department has two Automatic License Plate Readers (ALPR). These units are attached to the lightbars of marked squad vehicles. When an officer is patrolling around the Community, the ALPR's cameras record vehicle license plates on the roadway. Officers are able to be more pro-active locating stolen vehicle, revoked or suspended drivers, and warrants of violators.
ENVIRONMENTAL CONSIDERATIONS:When our License Plate readers are due for replacement, we will look at other vendors to see if the price of this technology has become more affordable.
Project # 17-052
Priority 5 Important
JustificationThis technology brings a higher level of safety to the community as a whole. It allows officers to 'look' at hundreds of vehicles vs. just a few dozen during a normal 12 hour shift.
Useful Life
Project Nam Police License Plate Reader (ALPR) Replacement
Category Technology
Type Replace or repair
Contact Dan Conboy
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior36,00036,000Vehicles and Equipment
36,000 36,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
36,00036,000Construction Fund: Equipment Levy
36,000 36,000Total
Friday, November 18, 2016Page 225
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPurchase of 35 body-worn cameras for officers.
COST CONSIDERATIONS:We anticipate that the cloud based storage annual cost to be roughly $45,000. We also anticipate that we would need to add an additional support person in the PD and an additional IT person.
Project # 17-053
Priority 3 Significant
JustificationBody-worn cameras can help improve the high-quality public service expected of police officers and promote the perceived legitimacy and sense of procedural justice that communities have about their police departments. Body-worn cameras can increase accountability and can create a public record that allows the entire community to see what really happened during a specific incident.
Useful Life
Project Nam Police Body-Worn Cameras
Category Technology
Type New
Contact Dan Conboy
Department Police
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior63,00063,000Vehicles and Equipment
180,00045,000 45,000 45,000 45,000Software
640,000160,000 160,000 160,000 160,000Staff
268,000 205,000 205,000 205,000 883,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
883,000268,000 205,000 205,000 205,000Unfunded
268,000 205,000 205,000 205,000 883,000Total
Friday, November 18, 2016Page 226
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Computer Aided Dispatch (CAD), Mobile Computing, and Records Management System (RMS) is utilized to provide police and fire dispatch services, information management, and digital records management services for the police department. Services are also provided with these systems to Edina Fire as well as Richfield Police and Fire through our cooperative dispatch services agreement.
We currently use a system from SunGard Public Sector (formerly OSSI) called ONESolution that was installed in 2008.
ENVIRONMENTAL CONSIDERATIONS:Computer hardware including file servers, workstations, displays, and portable computers, is advancing in power efficiency and recycle-ability. Our IT department is currently moving toward hosting numerous file server applications on more efficient single "Virtual Server" machines which will further improve energy efficiency of future computer technology acquisitions.
COST CONSIDERATIONS:It is anticipated current operating budget for licensing and maintenance fees would continue to cover those expenses for a new system.
Project # 17-054
Priority 3 Significant
JustificationThe CAD/RMS/Mobile system is critical and essential public safety infrastructure. It is based on computer hardware and software architecture which is technology that evolves rapidly. Being highly industry specific and propriety in nature it is also very expensive both in initial capital investment and ongoing maintenance costs. The initial capital cost of our current system was approximately $700,000 and as of 2016 costs approximately $110,000 per year in annual maintenance and license fees.
Ongoing advances in technology, difficultly in integrating this software with evolving county, state, and national databases, the potential for improved operating efficiency, and the significant ongoing operating costs demand that we research alternatives and plan for obsolescence of our current system. Researching, purchasing, and implementing a new solution could take up to two years.
The estimated costs are speculative at this time and our hope is that competition in the market place along with evolving technology will lower the current projection.
Useful Life
Project Nam Police Public Safety CAD and RMS
Category Technology
Type Replace or repair
Contact Aaron White
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,000,0001,000,000Vehicles and Equipment
1,000,000 1,000,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,000,0001,000,000Construction Fund: Equipment Levy
1,000,000 1,000,000Total
Friday, November 18, 2016Page 227
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe dispatch positions in our communication center use specialized computer workstations for Computer Aided Dispatch (CAD) and other related software applications. Each workstation utilizes two displays including a large 46" display. Powerful computers are required to run these programs and displays. The facility operates 24/7 providing critical public safety dispatch services.
This project will replace five CAD workstations currently deployed in the communications center.
ENVIRONMENTAL CONSIDERATIONS:Each new generation of computer hardware including workstations and displays is advancing in power efficiency and recycle-ability.
Project # 17-055
Priority 2
JustificationComputer hardware and software evolves very quickly and the useful life of this technology is relatively short. Purchasing high quality workstations allows us to project a four year life cycle of the current workstations replaced in 2015.
CAD workstations are eligible for funding from our E911 budget.
Useful Life
Project Nam Police CAD Workstations
Category Technology
Type Replace or repair
Contact Aaron White
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00020,000Vehicles and Equipment
20,000 20,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
20,00020,000E911
20,000 20,000Total
Friday, November 18, 2016Page 229
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionOur dispatch center records all audio for 911 and non-emergency phone calls as well as all radio traffic for public safety communications. This is a basic requirement for operating a dispatch center and recordings are frequently used for criminal prosecutions, other legal proceedings, complaint resolution, and training of personnel.
Advances in the 911 system will soon allow citizens to send text messages and other electronic communications to our dispatch center. We do not currently have the capability to log and record these communications.
Our current system installed in 2012 was projected to last longer but unfortunately is being rendered obsolete by technology changes and lack of support from the original supplier.
ENVIRONMENTAL CONSIDERATIONS:Computer hardware including file servers, workstations, displays, and portable computers, is advancing in power efficiency and recycle-ability.
Project # 17-056
Priority 2
JustificationDispatch radio, 911, and phone logging is a required function.
Next generation 911 technology expected to be deployed in 2017 will require us to log text messages and other electronic communications that our current system is not equipped for.
Our current Cybertech logging system is no longer being supported by the manufacture. In addition ongoing changes in third party software required to operate the current system are likely to render it obsolete.
Useful Life
Project Nam Police Dispatch Audio Logging
Category Technology
Type Expand or enhance
Contact Aaron White
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior27,50027,500Vehicles and Equipment
27,500 27,500Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
27,50027,500E911
27,500 27,500Total
Friday, November 18, 2016Page 230
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe radio consoles that interface our dispatch center to the statewide ARMER radio system rely on a single fiber optic cable link and microwave radio equipment installed in 2004. The current system is aging and we have no redundancy in the event of a failure. There are numerous single points of failure in this system. In addition the system is subject to "rain fade" during heavy rain or snow events where the signal is blocked. It is projected that the microwave radio system will become less reliable and will reach the end of its useful life in the coming years.
This project will occur in two phases. In 2017 phase one will include engineering and equipment to utilize LOGIS fiber optic cable to create a new primary network path for our radio system. Phase two will replace the existing microwave radio system. With a new primary radio link in place we hope to extend the life of the microwave system to 2021 or beyond.
ENVIRONMENTAL CONSIDERATIONS:New technology is likely to be more power efficient. There are not any green alternatives to the equipment required to provide this critical service.
Project # 17-057
Priority 1 Critical
JustificationOur dispatch connectivity to the ARMER radio system is a critical and essential public safety infrastructure. 100% uptime is essential for providing public safety services and assuring responder safety.
We have no backup system at this time. Failure of this link requires us to use individual backup radios which greatly limits our dispatch capabilities and eliminates our interoperability capability with other agencies and services.
The current system is subject to rain/snow fade which can render our dispatch radios inoperable during the most severe weather events.
Useful Life
Project Nam Police Dispatch Radio Console Connectivity
Category Technology
Type Expand or enhance
Contact Aaron White
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior280,00030,000 250,000Vehicles and Equipment
30,000 250,000 280,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
280,00030,000 250,000Construction Fund: Equipment Levy
30,000 250,000 280,000Total
Friday, November 18, 2016Page 231
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionEmergency Medical Dispatch (EMD) is a process where trained dispatchers assess medical emergencies in more detail during 911 calls and are able to provide life saving pre-arrival instructions to callers. It also allows dispatchers to more accurately provision Emergency Medical Services (EMS) resources and provide more detailed information to EMS responders while en-route to emergency scenes. It is an important part of our EMS response.
The EMD process is facilitated by computer software that integrates with our Computer Aided Dispatch (CAD) systems. Our current software provided by ProQA was purchased in 2007. Computer software and industry practices evolve over time and staying current is critical to providing high quality EMS services. New software can also provide added functionality in triaging emergency calls and more effectively provisioning other police and fire resources beyond EMS. This project will replace the aging ProQA software currently in use.
ENVIRONMENTAL CONSIDERATIONS:EMD software operates on existing CAD workstations. It will not require any additional energy resources. Environmental stewardship may be a factor for consideration in selecting a software vendor for this project.
Project # 17-058
Priority 3 Significant
JustificationProviding high quality Emergency Medical Services is a top priority of the Edina Police and Fire departments. Providing efficient and accurate pre-arrival instructions to 911 callers during incidents such as respiratory or cardiac arrest, choking, bleeding, or other critical trauma is absolutely essential and can make the difference between life and death for patients.
911 dispatchers are challenged by increasing workloads in a stressful work environment. Efficient and easy to use software can allow dispatchers to perform EMD in more situations and improve accuracy and quality of service. As with the provision of any medical services accuracy and proficiency are critical in ensuring positive outcomes and minimizing liability.
Useful Life
Project Nam Police Emergency Medical Dispatch Software
Category Technology
Type Expand or enhance
Contact Aaron White
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior27,50027,500Software
27,500 27,500Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
27,50027,500E911
27,500 27,500Total
Friday, November 18, 2016Page 233
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplacement of the Department's 55 Glock 40. caliber service weapons.
Project # 17-059
Priority 2
JustificationOur current weapon system, the Glock 40.cal was purchased in 2013. The handguns are due for replacement in 2021. These are the handguns officers carry on their duty belts. After shooting this current weapon for seven years, they will have had thousands of rounds shot through them. With that many rounds, the rifling in the barrels start to deteriorate and the accuracy of the weapon goes down. The special night sight chemical starts to wear off and are no longer 'glow in the dark' for accurate night time shooting. Some of the cost to purchase the new guns will be off-set by trading in our old guns.
Useful Life
Project Nam Police Glock Service Weapons
Category Equipment and Vehicles
Type Replace or repair
Contact Jeff Elasky
Department Police
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior14,00014,000Vehicles and Equipment
14,000 14,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
14,00014,000Construction Fund: Equipment Levy
14,000 14,000Total
Friday, November 18, 2016Page 235
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Habitat Court, Lincoln Drive, and Waterford Court) within the project area. This includes replacing the entire pavement surface; repair, replacement or addition of curb and gutter; and major maintenance or upgrade of public utilities (watermain, sanitary sewer, and storm sewer). Targeted installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements will also be considered.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-060
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Bredesen Park A/E Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior914,975914,975Construction
914,975 914,975Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
397,470397,470Construction Fund: Special Assessments
77,69577,695PACS Fund: Utility Franchise Fees
Friday, November 18, 2016Page 236
Capital Improvement Plan
City of Edina, MN
2017 2021thru
80,97880,978Utility Fund: Sewer
257,044257,044Utility Fund: Storm
101,788101,788Utility Fund: Water
914,975 914,975Total
Friday, November 18, 2016Page 237
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Ryan Avenue, Parnell Avenue, Virginia Lane, Virginia Avenue, West 60th Street, West 62nd Street, West 63rd Street, and West 64th Street) within the project area. This includes replacing the entire pavement surface; repair, replacement or addition of curb and gutter; and major maintenance or upgrade of public utilities (watermain, sanitary sewer, and storm sewer). Targeted installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements will also be considered.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-061
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Concord A/G Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior3,918,3453,918,345Construction
3,918,345 3,918,345Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,828,3251,828,325Construction Fund: Special Assessments
Friday, November 18, 2016Page 238
Capital Improvement Plan
City of Edina, MN
2017 2021thru
66,93766,937PACS Fund: Utility Franchise Fees
372,490372,490Utility Fund: Sewer
1,182,3801,182,380Utility Fund: Storm
468,213468,213Utility Fund: Water
3,918,345 3,918,345Total
Friday, November 18, 2016Page 239
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Edina Court) within the project area. This includes replacing the entire pavement surface; repair, replacement or addition of curb and gutter; and major maintenance or upgrade of public utilities (watermain, sanitary sewer, and storm sewer). Targeted installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements will also be considered.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-062
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area.
Useful Life
Project Nam Country Club C Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior167,297167,297Construction
167,297 167,297Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
79,41979,419Construction Fund: Special Assessments
16,18016,180Utility Fund: Sewer
51,36051,360Utility Fund: Storm
Friday, November 18, 2016Page 240
Capital Improvement Plan
City of Edina, MN
2017 2021thru
20,33820,338Utility Fund: Water
167,297 167,297Total
Friday, November 18, 2016Page 241
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Bello Drive, Overholt Pass, Paiute Circle, Paiute Pass, Sally Lane, and Shawnee Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performinginfrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new constructionprojects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologiesthus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-063
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Indian Trails B/C Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior2,371,5952,371,595Construction
2,371,595 2,371,595Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,125,8341,125,834Construction Fund: Special Assessments
Friday, November 18, 2016Page 242
Capital Improvement Plan
City of Edina, MN
2017 2021thru
229,370229,370Utility Fund: Sewer
728,078728,078Utility Fund: Storm
288,313288,313Utility Fund: Water
2,371,595 2,371,595Total
Friday, November 18, 2016Page 243
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Brookside Court, Brookside Terrace, and Motor Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-064
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Todd Park E/G Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior711,315711,315Construction
711,315 711,315Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
337,673337,673Construction Fund: Special Assessments
68,79568,795Utility Fund: Sewer
Friday, November 18, 2016Page 244
Capital Improvement Plan
City of Edina, MN
2017 2021thru
218,373218,373Utility Fund: Storm
86,47486,474Utility Fund: Water
711,315 711,315Total
Friday, November 18, 2016Page 245
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Countryside Road and Crescent Drive) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-065
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Countryside C Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior821,818821,818Construction
821,818 821,818Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
390,130390,130Construction Fund: Special Assessments
79,48279,482Utility Fund: Sewer
Friday, November 18, 2016Page 246
Capital Improvement Plan
City of Edina, MN
2017 2021thru
252,298252,298Utility Fund: Storm
99,90899,908Utility Fund: Water
821,818 821,818Total
Friday, November 18, 2016Page 247
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Creek Valley Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-066
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Creek Valley C Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior910,561910,561Construction
910,561 910,561Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
432,258432,258Construction Fund: Special Assessments
88,06588,065Utility Fund: Sewer
Friday, November 18, 2016Page 248
Capital Improvement Plan
City of Edina, MN
2017 2021thru
279,542279,542Utility Fund: Storm
110,696110,696Utility Fund: Water
910,561 910,561Total
Friday, November 18, 2016Page 249
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the reconstruction and rehabilitation of local streets (Branson Street, Crocker Avenue, Grimes Avenue, Littel Street, Lynn Avenue, Morningside Road, Oakdale Avenue, and West 42nd Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements.
ENVIRONMENTAL CONSIDERATIONS:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact.
Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques.
Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible.
COST CONSIDERATIONS:Proactive pavement maintenance (including seal coats and mill and overlays) can extend the life of the pavements from 20-30 years to approximately 50-60 years. Maintenance should be performed in years 7, 23, 41, and 60.
Project # 17-067
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Morningside D/E Reconstruction
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior6,315,9706,315,970Construction
6,315,970 6,315,970Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
2,506,1302,506,130Construction Fund: Special Assessments
940,552940,552Utility Fund: Sewer
Friday, November 18, 2016Page 250
Capital Improvement Plan
City of Edina, MN
2017 2021thru
1,214,5311,214,531Utility Fund: Storm
1,654,7571,654,757Utility Fund: Water
6,315,970 6,315,970Total
Friday, November 18, 2016Page 251
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPrepare a pedestrian and bicycle master plan update. The Plan will combine and update the 2007 Comprehensive Bicycle Transportation Plan, the 2014 pedestrian facilities comprehensive plan amendment and elements of the Living Streets Plan into one cohesive document that will outline the goals and implementation strategies for non-motorized transportation in the City. The Pedestrian and Bicycle Plan update will be amended to the transportation chapter of the 2018 Comprehensive Plan update.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-068
Priority 3 Significant
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Pedestrian and Bicycle Plan Update
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior75,00075,000Planning and Design
75,000 75,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
75,00075,000PACS Fund: Utility Franchise Fees
75,000 75,000Total
Friday, November 18, 2016Page 252
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves concrete sidewalk construction along the south side of W 58th Street from Wooddale Avenue to France Avenue. The new sidewalk will connect to existing sidewalks on Wooddale and France Avenues and is recommended in the City's Active Routes to School Plan.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks and pedestrian crossings support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-069
Priority 3 Significant
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam W 58th Street Sidewalk
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior318,100318,100Construction
318,100 318,100Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
318,100318,100PACS Fund: Utility Franchise Fees
318,100 318,100Total
Friday, November 18, 2016Page 254
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves concrete sidewalk construction along portions of the south side of Valley View Road from Mark Terrace Drive to Gleason Road. The new sidewalk will connect to existing sidewalks on Valley View Road and Gleason Road and is recommended in the City's Active Routes to School Plan.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks and pedestrian crossings support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-070
Priority 3 Significant
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Valley View Road Sidewalk
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior458,000458,000Construction
458,000 458,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
458,000458,000PACS Fund: Utility Franchise Fees
458,000 458,000Total
Friday, November 18, 2016Page 255
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the installation of thermoplastic crosswalk markings at all legs of the Vernon Ave and Eden Ave intersection. Additionally, some concrete work including medians and pedestrian ramps is included as well as pedestrian-activated crossing signals and signal timing.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-071
Priority 4
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Vernon Ave & Eden Ave Intersection Improvements
Category Infrastructure
Type Expand or enhance
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Construction
100,000 100,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
100,000100,000PACS Fund: Utility Franchise Fees
100,000 100,000Total
Friday, November 18, 2016Page 257
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves concrete sidewalk construction along the east side of the Highway 169 Frontage Road from Valley View Road to Braemar Boulevard. The new sidewalk will connect to existing sidewalk on Valley View Road and to Braemar Arena and Field.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks and pedestrian crossings support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
Project # 17-072
Priority 5 Important
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Highway 169 Frontage Road Sidewalk
Category Infrastructure
Type New
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior364,500364,500Construction
364,500 364,500Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
364,500364,500PACS Fund: Utility Franchise Fees
364,500 364,500Total
Friday, November 18, 2016Page 258
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the removal of the "free right" turn and replacement with a right-turn lane at the southbound exit ramp at TH100 and Vernon Avenue. Light pole and signal relocation will also be necessary, as will signal re-timing. Concrete work, including new sidewalk along the north side of Vernon Ave and ADA compliant pedestrian ramps, will also be constructed.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
COST CONSIDERATOINS:Estimated financing is based on anticipated 50% cost sharing from MnDOT, who has jurisdiction over the exit ramp.
Project # 17-073
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam Vernon Ave & SB TH100 Exit Ramp Free Right Removal
Category Infrastructure
Type Expand or enhance
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior350,000350,000Construction
350,000 350,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
175,000175,000Construction Fund: Grants & Donations
175,000175,000PACS Fund: Utility Franchise Fees
350,000 350,000Total
Friday, November 18, 2016Page 259
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the removal of the "free right" turn and replacement with a right-turn lane at the entrance ramp from W. 50th Street to northbound TH100. Additional intersection enhancements will be included at Grange Road and the entrance ramp to northbound TH100 to accommodate additional turning vehicles. Landscaping and signal timing will also be incorporated.
ENVIRONMENTAL CONSIDERATIONS:Sidewalks, pedestrian crossings and bicycle facilities support non-motorized transportation, which can replace vehicular travel, resulting in a reduction of greenhouse gas emissions.
COST CONSIDERATIONS:Estimated financing is based on anticipated 50% cost sharing from MnDOT, who has jurisdiction over the entrance ramp.
Project # 17-074
Priority 6
JustificationAs stated in Edina's strategic vision framework, Vision Edina: in the city there is "a strong desire to continue to expand a variety of transportation options to both reduce dependency on automobiles and enhance the community’s work and life balance, and ease of connectivity. Walking, biking, and transit options represent key amenities that help residents feel connected to their community, and improve the overall quality of life." This project follows Vision Edina strategic actions related to expanding the transportation network covering multiple modes of transportation as well as improving accessibility and connectivity throughout the city.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "maintain andenhance mobility for residents and businesses through creation and maintenance of abalanced system of transportation alternatives," and to "promote safe walking, bicycling, anddriving."
The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health.
Useful Life
Project Nam 50th Street and NB TH100 Entrance Ramp Free Right
Category Infrastructure
Type Expand or enhance
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior250,000250,000Construction
250,000 250,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
125,000125,000Construction Fund: Grants & Donations
125,000125,000PACS Fund: Utility Franchise Fees
250,000 250,000Total
Friday, November 18, 2016Page 261
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Benton Avenue bridge over the CP Rail line is in need of repair. The most recent inspection recommended development of a deck repair plan.
COST CONSIDERATIONS:Currently $100,000 is available annually for bridge maintenance. This will not be sufficient for significant bridge repairs.
Project # 17-075
Priority 5 Important
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue toimprove the aging infrastructure of the City."
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Bridge - Benton Avenue Over CP Rail
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior525,000525,000Construction
525,000 525,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
250,000250,000Construction Fund: Municipal State Aid
250,000250,000Unfunded
25,00025,000Utility Fund: Storm
525,000 525,000Total
Friday, November 18, 2016Page 263
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Wooddale Avenue Bridge over Minnehaha Creek is a Historic Bridge in need of rehabilitation. Specifically the wing walls and the bridge railings are deteriorating and need replacement. Because of the historic nature of the bridge the state historical society requires in-kind replacement materials and techniques.
COST CONSIDERATIONS:This bridge is eligible for both state and federal funding for rehabilitation. Currently $100,000 is available annually for bridge maintenance. This will not be sufficient for significant bridge repairs.
Project # 17-076
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project conforms to this mission statement by providing effective and valued public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The need is also emphasized in the 2008 Edina Comprehensive Plan to "continue toimprove the aging infrastructure of the City."
The recommended scheduling is based on the age and condition of the pavement surfaces,public utility systems, and pedestrian and traffic facilities. It may also be coordinated withother city, county, and state projects in the area.
Useful Life
Project Nam Bridge - Wooddale Avenue Bridge Rehabilitation
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior1,050,0001,050,000Construction
1,050,000 1,050,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
250,000250,000Construction Fund: Grants & Donations
375,000375,000Construction Fund: Municipal State Aid
375,000375,000Unfunded
50,00050,000Utility Fund: Storm
1,050,000 1,050,000Total
Friday, November 18, 2016Page 264
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will repair manholes and rebuild sanitary trunk sewer in the Presidents Neighborhood in northwest Edina. This area has a history of sanitary pipe surcharge and basement sewer backups.
The project was studied in 2015 as part of a WTP#4 Sewer Analysis. This is the second phase of project implementation to improve flow and reduce risk of surcharge and backup. In 2016 study area 3 was improved. This project proposes to relay sewer in study area 1 between MH 1325 and 1315, Line sewer between MH 1315 and 1317 and investigate study area 2 between MH 1317 and MH 1377 for a potential third phase after 2019.
ENVIRONMENTAL CONSIDERATIONS:Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. This project will use a combination of each.
Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system.
COST CONSIDERATIONS:Reduction of inflow and infiltration reduces metered flow which determines the City share of Met Council regional system expense.
Project # 17-077
Priority 2
JustificationSanitary sewer backups affect quality of life.
The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Presidents Area Sewer Rehabilitation, Area A
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Planning and Design
720,000720,000Construction
820,000 820,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
820,000820,000Utility Fund: Sewer
820,000 820,000Total
Friday, November 18, 2016Page 266
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will repair manholes and line sanitary trunk sewer on one of the deepest trunk sewer lines in Edina, near Lake Edina.
This project is described as project areas 8, 9, and 10 in the Trunk Sanitary Sewer Infiltration Study Report (December 2013). This project proposes to investigate, recommend and line segments of pipe and service risers between MH 3479 near Highway 100 and Lift Station 6.
ENVIRONMENTAL CONSIDERATIONS:Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations.
Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system.
COST CONSIDERATIONS:Reduction of inflow and infiltration reduces metered flow which determines the City share ofMet Council regional system expense.
Project # 17-078
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Lake Edina and South Cornelia Trunk Sewer Rehab
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior180,000180,000Planning and Design
1,020,0001,020,000Construction
1,200,000 1,200,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
1,200,0001,200,000Utility Fund: Sewer
1,200,000 1,200,000Total
Friday, November 18, 2016Page 268
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will remove a direct connection of storm sewer into the sanitary sewer system by capping the existing drainage path, and providing a downstream connection to a nearby storm sewer system.
ENVIRONMENTAL CONSIDERATIONS:Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations.
Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system.
COST CONSIDERATIONS:Reduction of inflow and infiltration reduces metered flow which determines the City share ofMet Council regional system expense.
Project # 17-079
Priority 2
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Centennial Lakes I/I Repair
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior50,00050,000Construction
50,000 50,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00050,000Utility Fund: Sewer
50,000 50,000Total
Friday, November 18, 2016Page 269
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project will replace, repair and rehabilitate watermain, gate valves,hydrants or service lines in areas that experience high reported breaks or component failure or are found to be near the end the their expected lifespan though maintenance records and nondestructive testing.
This project area is yet to be determined and will include professional services to scope need in areas that are suspected of being most at risk. In 2015 the rate of infrastructure replacement for water assets was less than 0.6% and we expect replacement need to be higher in the near future. As nondestructive testing is performed for the neighborhood street reconstruction program, additional water main needs will be assessed in nearby neighborhoods that have similar water main age cohorts and expected need.
ENVIRONMENTAL CONSIDERATIONS:Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations.
Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system.
Project # 17-080
Priority 5 Important
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Watermain Rehabilitation
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior250,00050,000 100,000 100,000Planning and Design
1,800,000900,000 900,000Construction
50,000 1,000,000 1,000,000 2,050,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
2,050,00050,000 1,000,000 1,000,000Utility Fund: Water
50,000 1,000,000 1,000,000 2,050,000Total
Friday, November 18, 2016Page 270
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionMinnehaha Creek Watershed District has plans to repair the stream channel in Arden Park. This project would be to partner with them on their effort to amplify the park and water resource enhancements beyond the stream corridor. Project goals would be to restore the natural stream function, enhance creek access, provide recreational improvements in and adjacent to the creek and improve public safety. The project may include sharing concept and design costs, riparian improvements, and maintenance of the natural elements.
COST CONSIDERATIONS:Managing vegetated areas will require ongoing maintenance, but the effort to maintain them should lessen after the vegetation gets established in the first couple of years.
Project # 17-081
Priority 5 Important
JustificationVision Edina identifies Environmental Stewardship as a key issue and notes that participants in the process were, "more supportive of environmentally responsible policies and practices than any other issue area."
The 2008 Comprehensive Plan references the water quality management goals of the Comprehensive Water Resources Management Plan which includes managing city water resources so that the beneficial uses of streams, wetlands, ponds, and lakes remain available to the community.
The City and Minnehaha Creek Watershed District entered into a Memorandum of Understanding in 2014 identifying areas of collaboration within the realms of land use planning, transportation, stormwater management, economic development, flood mitigation, parks and public land management, greenway development and water resource improvements.
Useful Life
Project Nam Arden Park Clean Water and Natural Resources
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Planning and Design
150,000150,000Construction
30,00010,000 10,000 5,000Installation/Maintenance 5,000
25,000 150,000 10,000 10,000 5,000 205,000Total 5,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
205,00025,000 150,000 10,000 10,000 5,000Utility Fund: Storm 5,000
25,000 150,000 10,000 10,000 5,000 205,000Total 5,000
Friday, November 18, 2016Page 271
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe project location is the shoreline of Mill Pond along E Sunnyslope Road. Shoreline stabilization is necessary to protect from further erosion.
The project would include construction, permitting, and an engineered design sufficient to meet Minnehaha Creek Watershed District rules.
Project # 17-082
Priority 4
JustificationVision Edina identifies Environmental Stewardship as a key issue and notes that participants in the process were, "more supportive of environmentally responsible policies and practices than any other issue area."
The 2008 Comprehensive Plan references the water quality management goals of the Comprehensive Water Resources Management Plan which includes managing city water resources so that the beneficial uses of streams, wetlands, ponds, and lakes remain available to the community.
This project could serve as a demonstration of a stabilized shoreline to educate the community on water quality practices that they could adopt on their own property. Heightening community awareness of water quality management through education is an action item in our Municipal Separate Storm Sewer System permit issued by the Minnesota Pollution Control Agency.
Useful Life
Project Nam Sunnyslope Road Shoreline Stabilization
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior75,00075,000Construction
75,000 75,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
75,00075,000Utility Fund: Storm
75,000 75,000Total
Friday, November 18, 2016Page 272
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City's stormwater infrastructure contains more than 7,000 manholes, catchbasin, inlets, and outlets, and more than 250 waterbodies that receive stormwater.
Regular inspection and maintenance of existing infrastructure can be more cost-effective for removing pollutants than implementing new practices. It is also required under the City's Municipal Separate Storm Sewer System permit. By the end of this 5-year permit term (issued in August 2013), every piece of the system will have been inspected. The list of needed repairs and maintenance will continue to grow as infrastructure ages and the City implements more practices to manage stormwater pollution.
Many ponds throughout the city intercept stormwater, providing stormwater pollution treatment. Over time, these basins fill in with sediment and other pollutants and require removal of material to remain effective. The number of stormwater ponds that are coming due or overdue for maintenance is currently unknown. This project would include an assessment of the City's stormwater ponds to establish a long-term maintenance schedule for dredging projects. This project would also include performing maintenance on ponds, per the schedule.
In summary, this project includes 1) needed repairs to existing storm sewer infrastructure, 2) a stormwater pond assessment and maintenance schedule, and 3) pond dredging for the purpose of maintaining the stormwater network.
COST CONSIDERATIONS:Infrastructure repairs/maintenance and pond dredging will be an ongoing cost; however, maintaining the present system will be more cost effective for reaching pollutant reduction goals than building new best management practices.
Project # 17-083
Priority 4
JustificationRegular inspection and maintenance of the storm sewer system infrastructure is required as part of the City's Municipal Separate Storm Sewer System permit issued by the Minnesota Pollution Control Agency.
The 2011 Comprehensive Water Resource Management Plan identifies multiple pond improvement projects to benefit water quality.
Edina has multiple waterbodies on the Federal 303(d) List of Impaired Waters that are not meeting water quality standards including Lake Edina, Lake Cornelia, Nine Mile Creek, and Minnehaha Creek.
Useful Life
Project Nam Pond and Outlet Maintenance Projects
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior75,00075,000Planning and Design
325,00050,000 75,000 100,000 100,000Installation/Maintenance
50,000 75,000 75,000 100,000 100,000 400,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
400,00050,000 75,000 75,000 100,000 100,000Utility Fund: Storm
50,000 75,000 75,000 100,000 100,000 400,000Total
Friday, November 18, 2016Page 273
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project proposal is for the completion of three storm sewer construction projects that were identified as part of the 2011 Comprehensive Water Resources Management Plan items. The three projects including chapter and drainage area references are;
10.3.1.3 - (NM494_4) - This project involves the replacement of approximately 275 feet of existing 12" storm sewer pipe with 24" storm sewer pipe on Gleason Road near 78th Street. The purpose of the project is to lower the 100-year flood elevation of a near by pond to protect adjacent properties from the current flood risk, protecting the lowest home. Completion of this project also will add capacity to the storm sewer network on Gleason Road near 78th Street.
10.3.1.1 - (SWP_14) This project involves the installation of a flap gate in an existing storm sewer manhole. By installing the flap gate in the manhole the flood risk to near by properties will be lowered.
9.3.1.1 - (AH_31) This project involves the replacement of existing storm sewer structures with new flow control structures to help limit the rate of flow to a rear yard depression. By slowing the rate of flow with the new structures the 100-year flood elevation is reduced, protecting nearby structures.
By combining these three projects, we are better able to use our limited financial resources to complete more necessary work for less cost.
ENVIRONMENTAL CONSIDERATIONS:This project furthers the goal of clean water and flood protection as articulated in section 8.2 of the 2008 Comprehensive Plan and the City of Edina Comprehensive Water Resource Management Plan.
COST CONSIDERATIONS:Cost for each project dependent on all projects being bid together.
Project # 17-084
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam 2018 Flood and Drainage Improvements
Category Infrastructure
Type Replace or repair
Contact Chad Millner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior190,000190,000Construction
190,000 190,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
190,000190,000Utility Fund: Storm
190,000 190,000Total
Friday, November 18, 2016Page 275
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves restoration and maintenance of native vegetation areas at Braemar Golf Course. A restoration project was successfully installed on the Executive Course in 2016 and this project would include expanding to the rest of the course that will undergo golf improvements in 2017. This project also includes maintenance of the native vegetation at the Executive par 3 course and the main course.
ENVIRONMENTAL CONSIDERATIONS:Native prairie and oak savanna bind the soil, reducing erosion and chemical use and provide habitat for wildlife, including pollinators.
COST CONSIDERATIONS:Regular maintenance is needed to protect an investment in vegetation restoration. Generally, more intense maintenance is needed when plants are first getting established.
Project # 17-085
Priority 4
JustificationVision Edina identifies Environmental Stewardship as a key issue and notes that participants in the process were, "more supportive of environmentally responsible policies and practices than any other issue area."
Native are restoration could help the city reach its GHG reduction goals identified in the Comprehensive Plan.
Useful Life
Project Nam Braemar Golf Course Native Area
Category Infrastructure
Type Replace or repair
Contact Ross Bintner
Department Engineering
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior60,00010,000Planning and Design 50,000
410,00055,000 45,000 37,500 37,500Construction 35,000200,000
65,000 45,000 37,500 37,500 470,000Total 35,000250,000
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
470,00065,000 45,000 37,500 37,500Utility Fund: Storm 35,000250,000
65,000 45,000 37,500 37,500 470,000Total 35,000250,000
Friday, November 18, 2016Page 277
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionWell #9 is located in a residential neighborhood (5904 Hanson Rd.) and is need of an exterior remodel to aesthetically blend in to the neighborhood. Interior process piping, electrical, mechanical and chemical feed equipment is outdated and not repairable.
Well #9 is the fourth and final well to be be connected to WTP #6. Initial design has been been completed and received neighborhood support. Construction cost estimate from Oertel Architects exceeded original CIP estimate of $200,000, project was put on hold for 2017-21 CIP cycle.
ENVIRONMENTAL CONSIDERATIONS:Interior upgrades include new LED lighting, premium efficient motor and Variable Frequency Drive (VFD) which controls optimum efficiency of the motor speed and pumping rate.
Project # 17-086
Priority 3 Significant
JustificationOur Vision Edina mission statement is to provide effective and valued public services, maintain a sound public infrastructure and offer premier public facilities. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply.
Useful Life
Project Nam Well #9 Building and Process Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior350,000350,000Installation/Maintenance
350,000 350,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
350,000350,000Utility Fund: Water
350,000 350,000Total
Friday, November 18, 2016Page 278
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionOur proposed project is to purchase a dedicated sign truck in order to continue to enhance the ability of the Edina sign department. With the increasing amount of sign installs and maintenance due to the addition of bike lanes, crosswalks and becoming 100 percent retroreflective compliant a dedicated sign truck is a necessity for the department to effectively perform our job duties and serve the residents.
We are proposing to purchase a F550 Ford Super Duty with a service body built to best accommodate storage compartments for but not limited to:• sign stock• hand tools• pneumatic post pounder• crane• hydraulic post puller• hardware • miscellaneous storage as needed by the department.
This request is strictly based on the needs of the department with specific vision given to the future maintenance that is needed within the system and addition of infrastructure in the City of Edina.
ENVIRONMENTAL CONSIDERATIONS: Throughout the crafting of this proposal greener alternatives are being considered.• Elimination of multiple pieces of equipment to accomplish a task. (currently drive front end loader all over town to pull sign posts and two service trucks, one pulling a compressor for installs and old signage that is being removed and the other with all new premade signage for install and traffic blocking)• Reduction in fuel due to only one piece of equipment required for accomplishing both the removal and installation of signage. (currently fuel is used in two service trucks, front end loader and compressor. Which two of those pieces consume diesel.)• Reduction in required labor. One person could work out of the vehicle and accomplish job duties and eliminate the need for two or three people on the same tasks.• Providing a safer work environment. Having the proper tooling that reduces the opportunity for back injuries and other muscle traumas. (currently we either manually pull signs by using a block of wood and a breaker bar or physically wrestle the post out of the ground)
Project # 17-098
Priority 5 Important
JustificationThe City of Edina is known for providing excellent city services and sound fiscal management. As we strive to improve the uncommonly high quality of life enjoyed by our residents we must also invest in our tools and improve our processes from the ground up in order to continue to provide such highly sought after services. The purchase of a dedicated sign truck is an innovative solution that harnesses the power of three pieces of equipment into one package that can maneuver to any location within the city, reduce the risk of injuries to those working in the field, execute tasks effectively and efficiently while being environmentally conscious reducing the amount of rolling stock required to perform our tasks. As stewards of our community we have a professional responsibility to serve our residents in the best manner possible and from our departmental standpoint this truck would be a key component in how we execute our daily operations increasing our efficiency not only as a traffic department but the Public Works as a whole. The purchase of a dedicated sign truck would be a key investment not only in equipment for the department but also in providing a community that is safe for bikers, motorists and pedestrians alike.
Useful Life
Project Nam Sign Maintenance Vehicle
Category Equipment and Vehicles
Type New
Contact Travis Gossard
Department Public Works
Status Pending
Friday, November 18, 2016Page 279
Capital Improvement Plan
City of Edina, MN
2017 2021thru
In the current state of the department the amount of growth that has been experienced and new policies set in place regarding retroreflective standards, it has become apparent that our quality of service to the residents of this community are beginning to suffer due to the lack of proper equipment to accommodate the daily tasks required in making Edina a great place to live. This piece of equipment is key in our ability to handle the growth, expectations and responsibilities of the department now and well into the future. The future purchase of this piece of equipment aligns itself very well with regards to our values as a city, an organization and a community as a whole. It is the mission of the city to provide effective and valued services and maintain sound public infrastructure in a manner that sustains the uncommonly high quality of life experienced by our residents. Please consider this project as a high priority in the 2017 CIP as its impact will be felt throughout the City of Edina.
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior142,000142,000Vehicles and Equipment
142,000 142,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
142,000142,000Unfunded
142,000 142,000Total
Friday, November 18, 2016Page 280
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City of Edina has built a state of the art vehicle repair facility. The proposed project would be to replace a 18000 lbs hoist with a 12000 lbs hoist. When the shop was built 7 years ago it had 3 smaller drive-on vehicle hoists installed called 18000 lbs hoists to accommodate cars, smaller pickups and full size pickups and we have found that the 18000 lbs hoist is too large to accommodate smaller cars and we would like to replace it with a smaller 12000 lbs hoist.
ENVIRONMENTAL CONSIDERATIONS: This is a safety issue.
Project # 17-099
Priority 7 Desirable
JustificationI believe a smaller hoist would reduce the risk of injuries for the mechanic because he would not have the lean over as far to repair brakes and replace tires.
The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam New Automotive Hoist
Category Equipment and Vehicles
Type New
Contact Gunnar Kaasa
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Vehicles and Equipment
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Unfunded
25,000 25,000Total
Friday, November 18, 2016Page 281
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis blending cabinet is a pump system that integrates different types of deicing chemicals. With this cabinet, we can set a certain percentage of product to mix with our salt brine and enhance the effectiveness of that product with another deicing product. Right now the city does this by hand with estimates on quantities. This would be very efficient and precise for our blending purposes.
ENVIRONMENTAL CONSIDERATIONS: This project would allow us to be more salt conscious with our usage. We would be able to use more liquid deicing product with our same trucks. In the long run greatly reducing our dependence on straight salt.
Project # 17-100
Priority 4
JustificationThis blending cabinet would allow our street department to fully use the different technologies that are out in the deicing arena. We have Calcium Chloride and Salt Brine now and we would be able to use these products more often with blending capabilities. Also new technologies such as beet juices, and bio chemicals, would be options that we could look at with blending equipment.
Useful Life
Project Nam Blending Cabinet
Category Equipment and Vehicles
Type New
Contact Shawn Anderson
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Vehicles and Equipment
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Utility Fund: Storm
25,000 25,000Total
Friday, November 18, 2016Page 282
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionEdina Public Works has fifty three (53) remote stations (wells, lift stations, storage facilities, treatment plants, etc.) with a Programmable Logic Controller (PLC), which are controlled and monitored by staff through a Supervisory Control and Data Acquistion (SCADA) system.
Of the 53 stations, 14 are equipped with outdated processors which communicate on proprietary ports and wiring and cannot be remotely accessed via Ethernet radios. Replacing these 14 sites with Ethernet compatible PLCs and PanelViews (touch screen interfaces) will simplify maintenance and programming, provide uniform Ethernet communication throughout the system and provide common spares for all remote stations.
Project # 17-102
Priority 1 Critical
JustificationSCADA is the communication backbone of the City's utility infrastructure allowing for remote monitoring, control and data collection in near real time. Upgrades will allow staff to provide consistent, reliable, effective and valued public service to our residents as outlined in Edina IQS.
Useful Life
Project Nam SCADA PLC and PanelView Upgrades
Category Technology
Type Expand or enhance
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior160,00080,000 80,000Vehicles and Equipment
80,000 80,000 160,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
160,00080,000 80,000Utility Fund: Water
80,000 80,000 160,000Total
Friday, November 18, 2016Page 283
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well #7 by repairing or replacing the wellpump, motor, and other worn equipment.
ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 17-103
Priority 2
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. Year around wells every 5-7 years. This fits into that work plan as it was last rehabilitated in 2012. This is a well that runs year round.
Useful Life
Project Nam Well #7 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Installation/Maintenance
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 284
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well # 8 by repairing or replacing the wellpump, motor, and other worn equipment and further developing the well hole itself.
ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 17-104
Priority 2
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. Year around wells every 5-7 years. This fits into the work plan as it was last rehabilitated in 2005.
Useful Life
Project Nam Well #8 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior150,000150,000Installation/Maintenance
150,000 150,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
150,000150,000Utility Fund: Water
150,000 150,000Total
Friday, November 18, 2016Page 285
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well # 11 by repairing or replacing the wellpump, motor, and other worn equipment.
ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 17-105
Priority 2
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. Year around wells every 5-7 years. This fits into that work plan as it was last rehabilitated in 2013. This is a well that runs year round.
Useful Life
Project Nam Well #11 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Installation/Maintenance
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 286
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well # 12 by repairing or replacing the wellpump, motor, and other worn equipment.
ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 17-106
Priority 3 Significant
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. Year around wells every 5-7 years. This fits into that work plan as it was last rehabilitated in 2013. This is a well that runs year round.
Useful Life
Project Nam Well #12 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Installation/Maintenance
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 287
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project would include the rehabilitation of Well # 19 by repairing or replacing the wellpump, motor, and other worn equipment.
ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable FrequencyDrives (VFD) that optimize energy use and pump efficiency.
Project # 17-107
Priority 3 Significant
JustificationOur Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a 15 year rehabilitation schedule for each of its seasonal municipal water wells. Year around wells every 5-7 years. This fits into that work plan as it was last rehabilitated in 2004. This is a well that runs year round.
Useful Life
Project Nam Well #19 Rehab
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior120,000120,000Installation/Maintenance
120,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000120,000Utility Fund: Water
120,000 120,000Total
Friday, November 18, 2016Page 288
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPainting of interior process piping, pressure filters, walls and concrete floor sealing.
Project # 17-108
Priority 3 Significant
JustificationCurrent paint system has reached useful life and is beginning to fail. Repainting will protect structural integrity of pipes and filters, extending the life of the infrastructure.
Useful Life
Project Nam WTP #4 Interior Painting
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior90,00090,000Installation/Maintenance
90,000 90,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
90,00090,000Utility Fund: Water
90,000 90,000Total
Friday, November 18, 2016Page 289
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPainting of interior process piping, pressure filters, walls and concrete floor sealing.
Project # 17-109
Priority 3 Significant
JustificationCurrent paint system has reached useful life and is beginning to fail. Repainting will protect structural integrity of pipes and filters, extending the life of the infrastructure.
Useful Life
Project Nam WTP #3 Interior Painting
Category Infrastructure
Type Replace or repair
Contact Dave Goergen
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior90,00090,000Installation/Maintenance
90,000 90,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
90,00090,000Utility Fund: Water
90,000 90,000Total
Friday, November 18, 2016Page 290
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionWe are proposing to clean the exterior Limestone that has been stained green by the copper siding above it. The City Hall building is central in our fleet of buildings both in its function/usage and in its place within our community. There is excessive staining on most of the exterior elevations. Most of the visible staining appears to be mineral deposits associated with the copper siding. This work includes cleaning of all of the Limestone on all of the exterior of City Hall. It is a delicate process that requires skill and experience in that Limestone is one of the softer and more porous stones used in facade work. There will need to be careful traffic coordination with surrounding lanes to effectively access the affected building elevations. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.
ENVIRONMENTAL CONSIDERATIONS: The cleaning process uses chemicals that will require containment systems placed around storm water collection systems prior to washing the stone.
Project # 17-110
Priority 5 Important
Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
The recommended cleaning is based on the age of the building and condition of the exterior limestone.
Useful Life
Project Nam City Hall Exterior Stone Cleaning
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior39,40239,402Installation/Maintenance
39,402 39,402Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
39,40239,402Unfunded
39,402 39,402Total
Friday, November 18, 2016Page 291
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project consists of the replacement of 8 compressors in our 2 90 ton condensing units located at City Hall. The units were installed 2003 and are at the recommended time of replacement 15 Years. The compressors are a critical part of the HVAC system at City Hall, and supports the office climate and environment. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.
ENVIRONMENTAL CONSIDERATIONS: This will cause the equipment to operate at the highest efficiency. The City has adopted the carbon emissions reduction goal of 25 percent by 2025. Renewal of the compressor part of our HVAC system will keep our equipment operating at its highest efficiency.
Project # 17-111
Priority 3 Significant
JustificationThis is a part of our City Work plan to maintain optimum equipment operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Condensor Units- Compressors
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior73,60073,600Vehicles and Equipment
73,600 73,600Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
73,60073,600Unfunded
73,600 73,600Total
Friday, November 18, 2016Page 292
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City Hall UPS System plays a critical role in backing up power for the IT systems and Dispatch operations. Our Dispatch division provides 911 dispatch services for Edina and Richfield Police. It is scheduled for renewal in 2018. The dispatch and IT division are a critical part of our public service infrastructure. The system operates as an alternative power source in the event that both the power and generator fail during an event.
Project # 17-112
Priority 3 Significant
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall UPS System
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior80,00080,000Installation/Maintenance
80,000 80,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
80,00080,000Unfunded
80,000 80,000Total
Friday, November 18, 2016Page 293
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe VCT (Vinyl Composition Tile) is scheduled for Renewal in 2021. The system was installed in 2004 and is in a highly trafficked public building. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.
ENVIRONMENTAL CONSIDERATIONS:
Project # 17-113
Priority 3 Significant
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall VCT Tile Flooring Renewal
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00020,000Installation/Maintenance
20,000 20,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
20,00020,000Unfunded
20,000 20,000Total
Friday, November 18, 2016Page 294
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe gas water heaters were installed in 2004 and are scheduled for replacement in 2021. The unit's are a vital part of operations supplying hot water for the building. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.ENVIRONMENTAL CONSIDERATIONS: The Edina comprehensive Plan Chapter Ten states for us to reduce Greenhouse gas emissions by 25 percent by 2025. Greater energy efficiencies in our water heaters help accomplish this goal.
Project # 17-114
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Water Heaters
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior39,74739,747Vehicles and Equipment
39,747 39,747Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
39,74739,747Unfunded
39,747 39,747Total
Friday, November 18, 2016Page 295
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City hall was built in 2004, the sheetrock wall finishes are due to be repainted in 2021. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.
Project # 17-115
Priority 4
JustificationThe Edina Vision statement states that we maintain premier facilities to the public.This is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Wall Finishes
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior37,86937,869Installation/Maintenance
37,869 37,869Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
37,86937,869Unfunded
37,869 37,869Total
Friday, November 18, 2016Page 296
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe exit lights and power system was installed in 2004 and is scheduled for replacement in 2021.The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.ENVIRONMENTAL CONSIDERATIONS: There are emerging technologies that are even more energy efficient then LED for Exit signs. There would be energy savings realized. The Edina comprehensive Plan Chapter Ten states for us to reduce Greenhouse gas emissions by 25 percent by 2025. Greater energy efficiencies in the doors and windows help accomplish this goal.
Project # 17-116
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Exit Lights
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior43,72443,724Installation/Maintenance
43,724 43,724Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
43,72443,724Unfunded
43,724 43,724Total
Friday, November 18, 2016Page 297
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City Hall fire alarm system was installed in 2004 and is scheduled for replacement in 2021.The Fire safety plan for this building that was approved dictated by City Code mandates a working Fire Alarm system. The Fire Alarm protects the staff, equipment and investment of our City Hall building. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.
Project # 17-117
Priority 3 Significant
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Fire Alarm System
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior196,525196,525Installation/Maintenance
196,525 196,525Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
196,525196,525Unfunded
196,525 196,525Total
Friday, November 18, 2016Page 298
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe carpeting system at City Hall was installed in 2004 and is scheduled for replacement in 2021.The City Hall is a high traffic volume facility. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility. There is a high volume of various foot traffic from Construction grade to office work that degrades a carpet system.ENVIRONMENTAL CONSIDERATION:
Project # 17-118
Priority 3 Significant
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Carpeting
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior402,309402,309Installation/Maintenance
402,309 402,309Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
402,309402,309Unfunded
402,309 402,309Total
Friday, November 18, 2016Page 299
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City Hall Building was built in 2004 and the vinyl wall paper is scheduled for replacement in 2021. The wall paper system degrades over time with lighting exposure and composition breakdown of glue and finishes. The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility.
Project # 17-119
Priority 6
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Vinyl Wall Paper
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior74,25574,255Installation/Maintenance
74,255 74,255Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
74,25574,255Unfunded
74,255 74,255Total
Friday, November 18, 2016Page 300
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe City Hall was built in 2004 and the ceilings and concrete walls have are scheduled to be repainted in 2021.The City Hall is our Centerpiece of Facilities in our building fleet. With close to 100 staff members on both the City hall and Police department side of the facility. The building is used for both Governmental purposes and as a public facility. Paint system degrade over time related to oxidation that occurs through time exposure and chemical composition breakdown.
Project # 17-120
Priority 6
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam City Hall Ceiling and Concrete Wall Painting
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior65,89365,893Installation/Maintenance
65,893 65,893Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
65,89365,893Unfunded
65,893 65,893Total
Friday, November 18, 2016Page 301
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe water seal membrane system has failed at the Police impound storage facility. Also the storm Drain pipe system has failed as well. Both of these systems failing has been at the root of water infiltration into the facility. The systems are 30 years old having been built in 1987. The systems are past their useful life and in dire need of replacement.
Project # 17-121
Priority 3 Significant
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Danen Building Police Garage
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior60,00060,000Installation/Maintenance
60,000 60,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
60,00060,000Unfunded
60,000 60,000Total
Friday, November 18, 2016Page 302
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Furnace and AC package unit is past its useful life as it was installed in 1990. The unit needs to be replaced and upgraded. The unit provide heating and cooling for the Arneson Acres Museum and rental facility. The Facility is home to rotating exhibits and a rental area that is utilized weekly throughout the year. HVAC equipment has a scheduled replacement time of 15 years. This standard has been recognized industry wide in facility management.ENVIRONMENTAL CONSIDERATIONS: This will cause the equipment to operate at the highest efficiency. The City has adopted the carbon emissions reduction goal of 25 percent by 2025. renewal of the complete will give us a more energy efficient operation thus helping us work towards the reduction goals.
Project # 17-122
Priority 4
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Arneson Acres Furnace and Package Units
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00020,000Installation/Maintenance
20,000 20,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
20,00020,000Unfunded
20,000 20,000Total
Friday, November 18, 2016Page 303
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe roofing system at Arneson was installed in 1989. The roofing system has reached the end of its useful life. The recommended facility maintenance standard is to replace the roofing system after 20 years. The facility is home to rotating exhibits and a rental area that is utilized weekly through out the year.ENVIRONMENTAL CONSIDERATIONS: A new roof would provide an increase in insulation value of the roof. Decreasing the buildings energy consumption . The City has adopted the Goal to reduce Greenhouse gas emissions by 25% by 2025. This would add to that reduction with a better insulated roof thus adding to energy conservation in the HVAC operation.
Project # 17-123
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Arneson Acres Roof Replacement
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior32,19632,196Installation/Maintenance
32,196 32,196Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
32,19632,196Unfunded
32,196 32,196Total
Friday, November 18, 2016Page 304
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe windows and doors are from 1989 and have reached their recommended time for replacement. The recommendation according to industry standards is 30 years. New doors and windows would increase the energy efficiency of the building. The facility is home to rotating exhibits and a rental area that is utilized weekly through out the year.ENVIRONMENTAL CONSIDERATIONS: The Edina comprehensive Plan Chapter Ten states for us to reduce Greenhouse gas emissions by 25 percent by 2025. Greater energy efficiencies in the doors and windows help accomplish this goal.
Project # 17-124
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Arneson Acres Door and Window Replacement
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,68430,684Installation/Maintenance
30,684 30,684Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,68430,684Unfunded
30,684 30,684Total
Friday, November 18, 2016Page 305
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe carpeting at Arneson Acres is past its useful life and needs to be replaced. It is 25 years old and we rent the facility out weekly to residents. The Facility is home to rotating exhibits and a rental area that is utilized weekly through out the year.
Project # 17-125
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Arneson Acres Carpet Replacement
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior36,00036,000Installation/Maintenance
36,000 36,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
36,00036,000Unfunded
36,000 36,000Total
Friday, November 18, 2016Page 306
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe roof on the maintenance building at Arneson Acres is past its useful life and needs to be replaced. The recommended facility maintenance standard is to replace the roofing system after 20 years. This building is attached to the greenhouses and saves the City literally thousands of dollars in plant materials that are used throughout the City. There are over 120 garden club volunteers that operate out of this facility.
Project # 17-126
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Arneson Acres Maintenance bldg. Roof Replacement
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior36,00036,000Installation/Maintenance
36,000 36,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
36,00036,000Unfunded
36,000 36,000Total
Friday, November 18, 2016Page 307
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Emergency Lights were installed in 1990 and the Fire alarm system was installed in 2005 both are scheduled for replacement in 2021.The Facility is home to rotating exhibits and a rental area that is utilized weekly through out the year. Exit signs and emergency lights are mandated by our Fire Marshall and our City Code. The emergency light systems assist in guiding people out of the building during an emergency, and the fire alarm system monitors fire safety and calls out to an central alarm monitoring service when in alarm mode.
Project # 17-127
Priority 5 Important
JustificationThe City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Arneson Acres Emergency Lights and Fire Alarm
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior43,32743,327Installation/Maintenance
43,327 43,327Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
43,32743,327Unfunded
43,327 43,327Total
Friday, November 18, 2016Page 308
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Public works facility was built in 2009. The Fire safety plan for this building mandates a working exit sign system. The Building Owners and Managers Association (BOMA) recommend that this type of system be replaced with the latest technology every 10 years. The exit signs are coming up on the end of their useful life and will need to be replaced.
ENVIRONMENTAL CONSIDERATIONS:There are emerging technologies that are even more energy efficient then LED for Exit signs. There would be energy savings realized. The Edina comprehensive Plan Chapter Ten states for us to reduce Greenhouse gas emissions by 25 percent by 2025. Greater energy efficiencies in the doors and windows help accomplish this goal.
Project # 17-128
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works Exit Sign Renewal
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior41,59041,590Installation/Maintenance
41,590 41,590Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
41,59041,590Unfunded
41,590 41,590Total
Friday, November 18, 2016Page 309
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Fire alarm system was installed in 2009 and in 2020 will have reached its expected life and will need to be scheduled for replacement. The Building Owners and Managers Association (BOMA) recommend that this type of system be replaced with the latest technology every 10 years. The Fire Alarm protects the staff, equipment and investment of our Public Works building.
Project # 17-129
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works Fire Alarm System
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior418,739418,739Installation/Maintenance
418,739 418,739Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
418,739418,739Unfunded
418,739 418,739Total
Friday, November 18, 2016Page 310
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Public works facility was built in 2009. The walls were painted in 2009 and will need a complete repainting to continue to be a Premier facility according to our Edina Vision statement.
Project # 17-130
Priority 6
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works Wall Finishes
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior38,43738,437Installation/Maintenance
38,437 38,437Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
38,43738,437Unfunded
38,437 38,437Total
Friday, November 18, 2016Page 311
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Public works facility was built in 2009.The Carpeting was installed in 2009 and is scheduled to be replaced in 2020, to maintain the premier facility of the Public Works Facility. The Public Works and Park Maintenance Facility is home to close to 100 staff and is open to the public and utilized weekly for both city and public meetings. There is a high volume of various foot traffic from construction grade to office work that degrades a carpet system.
Project # 17-131
Priority 6
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works Carpeting
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior56,62656,626Installation/Maintenance
56,626 56,626Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
56,62656,626Unfunded
56,626 56,626Total
Friday, November 18, 2016Page 312
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Public Works building was built in 2009 and has a state of the art vehicle storage facility. Part of operating a vehicle storage garage structure requires a concrete flooring system. To maintain it for maintenance and longevity, the concrete flooring needs to be resealed in 2020. There are over 300 pieces of equipment and vehicles of varying weight and size that traverse the garage floor system daily in all kinds of weather conditions and harsh chemical exposure conditions.
Project # 17-132
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works Bldg Concrete Floor Finish
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior204,266204,266Installation/Maintenance
204,266 204,266Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
204,266204,266Unfunded
204,266 204,266Total
Friday, November 18, 2016Page 313
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Security system of the Public Works was installed in 2009 and will be scheduled for renewal in 2020. The System is a key component securing and allowing access during business hours and after hours operations.
Project # 17-133
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum facility operations. Deferral of maintenance is always more expensive. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works Security System
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior212,618212,618Installation/Maintenance
212,618 212,618Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
212,618212,618Unfunded
212,618 212,618Total
Friday, November 18, 2016Page 314
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Public Works facility was built in 2009. It has a state of the art vehicle storage facility. Part of operating a vehicle storage garage requires you to have Nitrous Oxide and Carbon Dioxide sensors. These sensors measure the Parts per Million present within the atmosphere and activate exhaust systems to affect the alarm area. OSHA dictates that these devices should be installed and maintained to ensure a safe working environment. This protection type of system was established by OSHA and set forth in OSHA's Safety and Health Program Management Guidelines Janurary 26,1989. These sensors were originally installed in 2009. The original installed CO and NO2 sensors are no longer supported by the manufacturer.ENVIRONMENTAL CONSIDERATIONS: The City has adopted chapter 10 within our comprehensive plan to reduce overall emissions by 25 percent by 2025. One of the ways to do that is by detecting how much NO and CO2 are in a given area. These sensors will detect high levels of these emissions and evacuate them. Thus giving us the ability to manage and keep the levels low.
Project # 17-134
Priority 1 Critical
JustificationThese sensors are critical for the safety of staff in a large equipment filled garage.The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Public Works CO and NO2 Sensor Replacement
Category Buildings
Type Replace or repair
Contact Tim Barnes
Department Public Works
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior50,00050,000Installation/Maintenance
50,000 50,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00050,000Construction Fund: Available Funding
50,000 50,000Total
Friday, November 18, 2016Page 315
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionLewis Park is a 31 acre community park located at 7300 Cahill Road. Lewis Park contains three large, lighted sand peat soccer fields. One was reconstructed after the flooding in 1987. The soccer fields are in the center of the park and an ice rink and hockey rink with lights are on the east side of the park. The hockey rink was reconstructed in 1987 with 12" of fill material underneath the surface to stabilize poor soil conditions. The Park shelter building was constructed in 1979. The west end of the park was scheduled to be a large softball field, but because of demand for more soccer fields, it was converted to a soccer practice and game area. The playground equipment was constructed in 1978 and replaced in 1995 and the tennis courts were originally constructed in 1987. The playground equipment over 20 years old and is in need of replacement. A heavily used asphalt walking trail circles the park. The park currently has no master plan to guide planning, development or donation opportunities. Staff regularly receives comments, suggestions and requests from the community regarding donation opportunities and changes requested for the park. A strategic and planned approach is needed. Lewis Park is one of our heaviest used parks year round. Being the home of the Edina Soccer Club, the park hosts dozens of games weekly with visitors coming from all over the metro.
ENVIRONMENTAL CONSIDERATION: A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Project # 17-136
Priority 7 Desirable
JustificationThe Lewis Park shelter building was constructed in the 1979 and is in very poor condition. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 4.2 states - Provide specialized park infrastructure to address under served needs, emerging trends and support year round uses. 4.2.4 states - Require community driven master plans and/or public input process for all projects with greater than $250,000 improvements. Staff is recommending replacing the Lewis Park Shelter building in 2020. The cost of the shelter replacement will exceed $250,000. A park investment of this magnitude necessitates a park master plan in order to ensure the best utilization of the park and new community facility. A master plan would provide the opportunity to protect and preserve the City's environmental asset while also providing an opportunity to gather community input on park utilization and programming. A master plan provides a guide and focus for future development opportunities, capital planning and donation opportunities. Twelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system.
Useful Life
Project Nam Lewis Park Master Plan
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Planning and Design
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Unfunded
40,000 40,000Total
Friday, November 18, 2016Page 316
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionArden Park is a 15 acre park and is one of the oldest park areas in Edina. It is located at the intersection of 52nd Street and Minnehaha Blvd. The land was dedicated in the early 1920's. The park is the site of Edina's first hockey rink installed in 1949. In 1983, the park trees were partially destroyed by a tornado. Many of the trees in the park have been planted and donated by neighbors. Arden Park is a neighborhood park with only hockey scheduled in the winter and no activities scheduled during the summer, primarily because the condition of the park shelter building is very poor and the park is susceptible to flooding. If the park floods, it takes quite a while for it to dry out enough to resume recreational activities. The park currently has no master plan to guide planning, development or donation opportunities. Staff regularly receives comments, suggestions and requests from the community regarding donation opportunities and changes requested for the park. A strategic and planned approach is needed.
ENVIRONMENTAL CONSIDERATIONS:A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Project # 17-137
Priority 7 Desirable
JustificationThe Arden Park shelter building was constructed in the 1970's. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 4.2 states - Provide specialized park infrastructure to address under served needs, emerging trends and support year round uses. 4.2.4 states - Require community driven master plans and/or public input process for all projects with greater than $250,000 improvements. Staff is recommending replacing the Arden Park Shelter building in 2019. The cost of the shelter replacement will exceed $250,000. A park investment of this magnitude necessitates a park master plan in order to ensure the best utilization of the park and new community facility. A master plan would provide the opportunity to protect and preserve the City's environmental asset while also providing an opportunity to gather community input on park utilization and programming. A master plan provides a guide and focus for future development opportunities, capital planning and donation opportunities. This park also has a tremendous asset, Minnehaha Creek flowing through it. Future partnership opportunities with the Minnehaha Creek Watershed District for development are significant, but require a park master plan. Twelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system.
Useful Life
Project Nam Arden Park Master Plan
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Planning and Design
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Unfunded
40,000 40,000Total
Friday, November 18, 2016Page 318
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionArneson Acres Park is a 15 acre special use park. Arneson Acres was donated to the City of Edina my Morten and Katherine Arneson in 1969. This donation helped further the development of horticulture in the city park system. In 1986 the Edina Historical Museum was relocated to the upper floor of the Arneson Acres home. In 1987 a long range master plan of Arneson Acres was drawn and paid for by the Garden Council, but was never fully implemented. The park has 2 greenhouses, a gazebo and large, unique formal garden. The gazebo, formal garden and lower level of the home are regularly rented for weddings, parties and events. The home is also utilized by the Historical Society and the Edina Garden Council. The park is also used for sledding and as a gathering spot for youth seeking a quiet place to socialize and relax. The Garden Council regularly requests additions and improvements to the park. Without a current master plan, approval of new projects is increasingly difficult and is raising frustration with the Garden Council which would like to fund improvements to the park. The lack of vision for the entire park is also hurting fundraising and donation opportunities for the park.
Project # 17-138
Priority 6
JustificationTwelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system. A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Useful Life
Project Nam Arneson Acres Master Plan
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior50,00050,000Planning and Design
50,000 50,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00050,000Unfunded
50,000 50,000Total
Friday, November 18, 2016Page 320
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Birchcrest Park.
Project # 17-139
Priority 6
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Birchcrest Park was installed in 1997. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Birchcrest Park was ranked a priority 2. A budget of $125,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states. Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning. The current playground structure does not meet current ADA regulations.
Useful Life
Project Nam Birchcrest Park Playground Replacement
Category Parks
Type Replace or repair
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior125,000125,000Construction
125,000 125,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
125,000125,000Unfunded
125,000 125,000Total
Friday, November 18, 2016Page 321
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe renovation of Braemar Golf Course is providing an opportunity to add a Nordic ski trail and snow tubing amenity with man-made snow at Braemar Park. Assuming that some small amount of excavation is possible, it should be possible to make all of the trails skiable and fun, with a range of terrain for different skill/comfort levels. The lower trails that loop around the mellow tubing hill, up the existing cart path, and around the knoll back to the parking area, will be very good beginner terrain for skiers and possibly snowshoers. Once skiers begin to climb up the hillside into the forest, a great intermediate trail will loop around the northeastern knoll before descending back down to the top of the tubing hill or possibly to the most northeastern tee box. From the highest point of the intermediate loop, skiers have the option to descend along the ridgeline on a fun, twisting, and high-intermediate to advanced trail that will take them all the way to the southernmost knoll of the forested hillside east of the golf course. The trail as it is currently laid out in concept is at least 3km, with approximately 30% beginner, 20% intermediate and 50% advanced terrain. This trail network will serve the community of Edina, as well as surrounding areas, with first-rate skiing and winter sports. It also has the potential to host great local events for all ages and ability levels.
ENVIRONMENTAL CONSIDERATIONS:Currently the hill on the east side of Braemar Park is undertilized. Buckthorn is choking out and killing the trees in the area. The project provides year round access to this park asset. Trees would be removed, but buckthorn would also be removed, creating a healthier environment for more beneficial tree and plant growth. This ties well with the environmental improvements with the Braemar Academy 9 renovation and the regulation course renovation.
Project # 17-140
Priority 7 Desirable
JustificationParks, Recreation & Trails Strategic Plan
Parks, Open Spaces and Trails Implementation FrameworkStrategy 4.2.2 - Provide infrastructure to support winter uses and trails into existing parks for a variety of skills and mobility uses that will bring more residents to parks in winter months.Strategy 4.2.3 - Emphasize year round opportunities at Braemar Park to cross pollinate with existing activities. Explore mountain biking trails, snow making for ski trails, biathlon training infrastructure and additional winter uses.
Parks, Recreation & Trails Strategic Plan Key RecommendationsNatural Resources & Sustainable Parks- #3 Provide greater access to natural areas for passive recreation and interpretationParks, Open Spaces & Trails- #6 Provide more specialized facilities, dog parks, frisbee golf, etc.Recreation Programs- #1 Provide a variety of programs that meet community needs and interests and maintain the highest level of excellence- #3 Provide more community building/socialization programming
Parks, Recreation & Trails Strategic Plan Guiding Principles- Promote community health and wellness by engaging all residents in our parks and programs- Provide excellence and innovation in parks and recreation services to meet the needs of the community- Develop creative funding opportunities and programming partnerships to ensure excellence in facilities, programs and financial stewardship for future generations.- Advance environmental stewardship and conservation to preserve and protect natural resources and build excellence through sustainability
Useful Life
Project Nam Braemar Winter Recreation
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
Friday, November 18, 2016Page 322
Capital Improvement Plan
City of Edina, MN
2017 2021thru
- Connect residents to park facilities and their programs
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior330,277192,146Planning and Design 138,131
2,670,0002,670,000Construction
2,862,146 3,000,277Total 138,131
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
3,000,2772,862,146Unfunded 138,131
2,862,146 3,000,277Total 138,131
Friday, November 18, 2016Page 323
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project includes the replacement of existing lights, poles and control system for Courtney Field #1. The current lighting system is out dated and does not provide the adequate light for the main baseball field on Courtney field #1. The lighting control system is also out dated and this replacement project would give the city better control by being able to program the lights to turn on and off.
ENVIRONMENTAL CONSIDERATIONS:New lights will be more energy efficient than the current (30plus) year old lights. With new Musco lighting control energy will be saved by allowing us to program lights for when specifically needed.
Project # 17-141
Priority 5 Important
JustificationThis project is a top priority since the field is scheduled each year with heavy use from the Edina Baseball Association, Edina High School and Edina Legion Baseball Programs. The current lighting system is in desperate need of replacement. This project would allow us to improve the lighting by raising the poles and allowing for improved area field lighting as well as adding protective netting to provide additional safety for the surrounding fields.
Useful Life
Project Nam Courtney Field Lighting Replacement
Category Parks
Type Replace or repair
Contact Eric Boettcher
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior250,000250,000Vehicles and Equipment
250,000 250,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
250,000250,000Unfunded
250,000 250,000Total
Friday, November 18, 2016Page 324
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionBraemar,or Courtney Fields is an active park within our parks system, with four fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 40 years old, and is due for replacement and no longer supported. Which means we are unable to secure parts for this system on top of this the system also uses an excess amount of water and is not efficient.
ENVIRONMENTAL CONSIDERATIONS:Chapter 8 section 3 of our comprehensive plan has set the goal of providing the sustainability of our City water system through preservation and conservation. An improved and updated water irrigation system that is more effective in the metering capability will assist us in accomplishing this goal.
Project # 17-142
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Courtney Fields Irrigation
Category Parks
Type Replace or repair
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior47,00047,000Vehicles and Equipment
47,000 47,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
47,00047,000Unfunded
47,000 47,000Total
Friday, November 18, 2016Page 325
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionCreek Valley park is an active park within our parks system, with two soccer fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 30 years old, and is due for replacement. Which means we are unable to secure parts for this system on top of this the system also uses an excess amount of water and is not efficient.
ENVIRONMENTAL CONSIDERATIONS:Chapter 8 section 3 of our comprehensive plan has set the goal of providing the sustainability of our City water system through preservation and conservation. An improved and updated water irrigation system that is more effective in the metering capability will assist us in accomplishing this goal.
Project # 17-143
Priority 6
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Creek Valley Irrigation
Category Parks
Type Replace or repair
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Vehicles and Equipment
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Unfunded
30,000 30,000Total
Friday, November 18, 2016Page 326
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Fox Meadow Park.
Project # 17-144
Priority 6
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Fox Meadow Park was installed in 1996. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Fox Meadow Park was ranked a priority 1. A budget of $75,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states - Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning. The playground structure does not meet current ADA standards.
Useful Life
Project Nam Fox Meadow Park Playground Equipment
Category Parks
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior75,00075,000Vehicles and Equipment
75,000 75,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
75,00075,000Unfunded
75,000 75,000Total
Friday, November 18, 2016Page 327
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionGarden park is an active park within our parks system, with two soccer fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 40 years old, and is due for replacement and no longer supported. Which means we are unable to secure parts for this system .on top of this the system also uses an excess amount of water and is not efficient.
ENVIRONMENTAL CONSIDERATIONS:
Chapter 8 section 3 of our comprehensive plan has set the goal of providing the sustainability of our City water system through preservation and conservation. An improved and updated water irrigation system that is more effective in the metering capability will assist us in accomplishing this goal.
Project # 17-145
Priority 4
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Garden Park Irrigation
Category Parks
Type Replace or repair
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00020,000Construction
20,000 20,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
20,00020,000Unfunded
20,000 20,000Total
Friday, November 18, 2016Page 328
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionHighlands Park is a 43 acre park andwas the first park totally completed with fields and landscaping in 1960. The Park shelter building was installed in 1974. The skating rink was installed in 1984 with a modification of the general skating rink from the lake to a dry, flooded area. The hockey rink is the first rink to have a stabilizing material under the fill because of the soil conditions. New playground equipment was installed in 1984 and replaced again in 1997. In 1984, the softball field at the south end of the park was modified, the large baseball field was eliminated and a multi-use sports field was placed in it's location. The tennis courts were constructed in 1963 and resurfaced in 1977 and 1985. The park currently has no master plan to guide planning, development or donation opportunities. Staff regularly receives comments, suggestions and requests from the community regarding donation opportunities and changes requested for the park. A strategic and planned approach is needed.
ENVIRONMENTAL CONSIDERATION: A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Project # 17-146
Priority 7 Desirable
JustificationThe Highlands Park shelter building was constructed in the 1974 and is in need of replacement. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 4.2 states - Provide specialized park infrastructure to address under served needs, emerging trends and support year round uses. 4.2.4 states - Require community driven master plans and/or public input process for all projects with greater than $250,000 improvements. Staff is recommending replacing the Highlands Park Shelter building in 2018. The cost of the shelter replacement will exceed $250,000. A park investment of this magnitude necessitates a park master plan in order to ensure the best utilization of the park and new community facility. A master plan would provide the opportunity to protect and preserve the City's environmental asset while also providing an opportunity to gather community input on park utilization and programming. A master plan provides a guide and focus for future development opportunities, capital planning and donation opportunities. Twelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system.
Useful Life
Project Nam Highlands Park Master Plan
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Planning and Design
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Unfunded
40,000 40,000Total
Friday, November 18, 2016Page 329
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Lewis Park.
Project # 17-148
Priority 4
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Lewis Park was installed in 1995. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Lewis Park was ranked a priority 1. A budget of $175,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states. Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning. The current playground structure does not meet current ADA regulations.
Useful Life
Project Nam Lewis Park Playground Replacement
Category Parks
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior175,000175,000Vehicles and Equipment
175,000 175,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
175,000175,000Unfunded
175,000 175,000Total
Friday, November 18, 2016Page 331
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionAn outdoor message board is a fire and life safety tool used by public safety personnel to communicate with the citizens and those visiting the City of Edina. The outdoor messaging board has two primary purposes. First, it will deliver fire and life safety messages as an integral part of our outreach community risk reduction initiative. Second, it will serve to communicate important time sensitive information essential to preserving lives and property. Everything from imminent severe weather information to missing person alerts can be distributed by mass communication with this message board.
ENVIRONMENTAL CONSIDERATIONS:Light Emitting Diodes (LED's) will be specified for this message board. LED's are preferred because they use less energy than traditional illumination devices, allow for ease of message changes and do not contain mercury to pollute our environment like other devices.
COST CONSIDERATIONS:The project will require ongoing technology maintenance costs. The costs should be minimal since the successful bidder uses the same technology for other outdoor message boards owned by the city of Edina. Other costs, such as energy consumption, will be reduced by energy savings from the current technology at fire station one.
Project # 17-150
Priority 6
JustificationOur current messaging board is 13 years old. It was moved from the old fire station and placed in front of the new station in 2008. The current board utilizes old technology (light board) in that it is a clear plastic face that illuminates the message through back lighting.
All of the messaging is done manually by a person placing individual letter tiles to spell out the message. This process is time consuming and it is done throughout the year even in inclement weather. This also leads to minimal messaging due to the time commitment.
The department is currently in the process of re-branding to the new logo. The old fire department logo is affixed to the current board. In addition, the board has seen it years and it is in need of repair - over the past several years we have had costly repairs and maintenance in excess of $9,000 (the original purchase price was $5K). Currently the locking mechanisms on both sides of the board covers no longer function, increasing the chance for vandalism. It does not make sense to add any additional expense to an aging board. The department has made several attempts over the years to seek various grant funding options to replace the board but we have not been successful.
The outdoor message board will provide the opportunity to capitalize on new technology and will afford an efficient means to provide routine and emergent messaging every day. The electronic display will alert the public to important public safety education messages, life safety related messages and impending severe weather events. As a mass communications tool, it will provide outreach capabilities not available today to our public safety team. This important communicator is congruent with the mission of the Fire department and the City of Edina to provide our community with timely and up to date information.
Useful Life
Project Nam Outdoor Message Board
Category Equipment and Vehicles
Type New
Contact Tom Schmitz
Department Fire
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior22,62522,625Vehicles and Equipment
1,0551,055Installation/Maintenance
23,680 23,680Total
Friday, November 18, 2016Page 332
Capital Improvement Plan
City of Edina, MN
2017 2021thru
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
23,68023,680Unfunded
23,680 23,680Total
Friday, November 18, 2016Page 333
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPurchase Gear Dryers for Firefighting Personal Protective Gear.
Meet industry best practices for the care and maintenance of firefighting personal protective equipment (Turnouts). PPE equipment that make up Turnouts include: Coat, pants, boots, gloves, Normex hood, helmet and SCBA face piece. Turnouts are required during any fire suppression activity or were the exposure to hazardous environments is immediately dangerous to life and health (IDLH).
Our current practice is to clean our turnouts after exposure to the byproducts of combustion (smoke) and other hazardous chemicals. This process can take several hours to days depending on the degree of contamination, the extent of the cleaning and the ambient temperatures and humidity levels. If the turnouts undergo a full cleaning it will take several hours to a few days for the gear to properly dry out. In some cases there isn't sufficient time and the turnouts are placed back in-service. In those situations, firefighters are wearing wet gear. This can cause excessive wear and tear on the gear and shorten its life span. In addition, wearing wet turnouts can raise safety concerns for firefighters, i.e., entering a superheated environment with wet turnouts will increase the transfer of heat to the firefighter and entering some hazardous chemical atmospheres with wet turnout gear can adversely effect the turnout hear material/fabric exposing the firefighter to the chemical.
COST CONSIDERATIONS:Ram Air Gear Dryer: 1 6-MU Dryer Station 1 - $7,300 1 4-MU Dryer for Station 2 - $6,700 1 4-IHT Dryer Station 1 - $6,900
Project # 17-151
Priority 1 Critical
JustificationHigh quality, well maintained, clean and properly dried firefighter protective clothing is one of the most critical components in a firefighters immediate and long-term health and safety. Recent changes in the National Fire Protection Association standards regarding turnout gear recommends replacement of all components of turnout gear no greater than every 10 years. A key component to achieving a 10 year life span is properly cleaning and drying the gear. Turnouts cannot be dried in a conventional dryer. It can cause excessive wear and tear on the gear, may void any warranties and causes excessive wear and tear on the dryer. Our current practice is to layout the gear after it has been washed and allow ambient air to pass over and slowly dry the gear. This can take several hours or days to completely dry the gear. Following any significant fire or exposure to other chemicals we will have several sets of turnouts that will be laid out in the station waiting to dry. A manufactured, NFPA compliant, turnout gear dryer will thoroughly and completely dry all the components of the gear in a significantly shorter period of time and it greatly streamlines this process.
A primary emphasis for recent changes in the National Fire Protection Association Standards is to provide an environment where firefighters can take their turnout gear out of service following exposure to hazardous environments and clean it properly. A key component to this successful process is ensuring a quick turn-around time for getting the gear properly dried and back in-service.Current situations arise where firefighters have to cutback on the cleaning and drying time to get the gear in-service. In some cases the firefighters will refrain from properly cleaning turnouts because they know the lengthy time it will take before it is available for use. The turnout gear dryers will greatly reduce the turn-around time to a fraction of the time we spend today. The gear drying manufacturer states dry times typically will be 4 - 6 hours. This is a significant reduction in drying time from our current practice.
Research has shown that cancer among firefighters is higher then the general population. Emerging research is showing that contaminated turnout gear may be a primary source of carcinogens which is exposing our firefighters. Creating an environment that allows firefighters to
Useful Life
Project Nam Firefighting Personal Protective Gear Dryer
Category Equipment and Vehicles
Type New
Contact Tom Shirley
Department Fire
Status Active
Friday, November 18, 2016Page 334
Capital Improvement Plan
City of Edina, MN
2017 2021thru
properly clean, dry and maintain their turnouts is critical for their health and safety.
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior22,10022,100Vehicles and Equipment
22,100 22,100Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
22,10022,100Construction Fund: Available Funding
22,100 22,100Total
Friday, November 18, 2016Page 335
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Fire Station Alerting system alerts the emergency responders in the fire stations that there is an emergency call that they need to respond to. Alerting devices include speakers, strobe lights and display monitors. A key component to a successful system is equipment located at the dispatch center and the fire stations. The scope of this request would include equipment and software that will be installed at the dispatch center and both fire stations. The system would activate lights, alert-tones, audio messages and display boards digitally to notify personnel of the location and nature of the emergency call.
COST CONSIDERATIONS:The $185K includes equipment, software, training, installation, for dispatch center and Station 1 & 2 and $5K contingency. There is an annual support fee for the system of $11,300.00. This would need to be added to our annual budget.
Project # 17-152
Priority 1 Critical
JustificationOur current station alerting system is approximately 10 years old. It was custom manufactured which in its aging years is making it difficult to repair and replace. The frequency of breakdowns is increasing and the company that custom built the system has recommended that we replace it with an "out of the box" system. While we have not had a bad outcome from delayed response due to the system failures, the potential consequences of such a delay are quite high. A key component to the success of the current notification system is predicated on the dispatcher activating the appropriate alert tone and using a volume, tone and pitch over the radio that can be consistently understood.
It is absolutely critical to our operations that we have a system that is 100% accurate 100% of the time. Reliability is key. Our current system is heavily based on the human element. Inconsistency in dispatchers can result in delayed notification, inaccurate information and inappropriate units dispatched. Current practice is to manually active an alert tone (human action) followed up with information relayed over the radio (human action). There are numerous times when incorrect or no alert tones are transmitted and inconsistent volume, tone and pitch of dispatchers can make it difficult or impossible to understand the message. This results in duplication of radio traffic once crews are in-service to gain clarification and to clear up any misunderstandings. A very common occurrence.
A system that is designed to generate the notification from the moment the dispatcher begins inputting the information into the CAD computer and deliver that information through digital technology in a consistent way can greatly improve our understanding of the nature of the emergency and our response. This will result in streamlining the dispatching process and provide efficiency for the dispatcher. Removing the human element as much as possible during the initial notification process is key to the reliability of the alerting system. Utilizing dispatchers to begin the process through the CAD notification interface and once crews are in their vehicles and ready to take additional information over the radio will result in a better flow of communications across the board. This will provide effective and efficient communications for all elements of the response.
Useful Life
Project Nam Fire Station Alerting System
Category Technology
Type New
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior185,000185,000Vehicles and Equipment
185,000 185,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
185,000185,000Construction Fund: Available Funding
Friday, November 18, 2016Page 336
Capital Improvement Plan
City of Edina, MN
2017 2021thru
185,000 185,000Total
Friday, November 18, 2016Page 337
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplacement of the doors, kick-plates and the cabinet under the sink in the kitchen of Fire Station 1.
Project # 17-153
Priority 6
JustificationMany of the lower cabinet doors and kick-plates in the kitchen at Fire Station 1 are losing their finish and the cabinet under the sink is delaminating and beginning to fall apart.
With the frequent tours of the Fire Station given to members of the public, the aesthetics of unfinished and crumbling cabinet doors leaves a bad impression with visitors. The continued disintegration of the cabinet below the sink will become a structural problem for the counter-top above.
Useful Life
Project Nam Fire Station 1 Kitchen Cabinet Re-facing
Category Buildings
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Vehicles and Equipment
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Unfunded
30,000 30,000Total
Friday, November 18, 2016Page 338
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 11 year old walk-behind floor Scrubber for Station 1. The current equipment was purchased in 2008 as a demo unit.
Project # 17-154
Priority 4
JustificationThis walk-behind floor scrubber mechanically scrubs floors inside station and apparatus floor. This equipment is used daily to keep the floors clean and clear of slippery fluids such as oils and greases. Keeping the all floor surfaces clean and well maintain extends the life of the floor surface and projects a professional and high quality fire station.
Useful Life
Project Nam Floor Scrubber
Category Equipment and Vehicles
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior18,00018,000Vehicles and Equipment
18,000 18,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
18,00018,000Construction Fund: Equipment Levy
18,000 18,000Total
Friday, November 18, 2016Page 339
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace staff vehicle according to the equipment replacement schedule. The Inspections division has several passenger vehicles used to get Inspectors to various work sites around the City. These vehicles have an estimated useful life of 10 years. This purchase will replace a 2010 Ford Focus.
ENVIRONMENTAL CONSIDERATIONS:Tentative plan is to replace vehicles with hybrid technology.
Project # 17-155
Priority 3 Significant
JustificationRegular replacement of these vehicles because of the high mileage and emergency response activity after 10 year service life is critical to keep maintenance costs low.
Useful Life
Project Nam Building Inspections Staff Vehicle (2020)
Category Equipment and Vehicles
Type Replace or repair
Contact Dave Fischer
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00020,000Vehicles and Equipment
20,000 20,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
20,00020,000Construction Fund: Equipment Levy
20,000 20,000Total
Friday, November 18, 2016Page 340
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionApply epoxy floor coating to kitchen, lounge, hallways, landings, and stairs. The original concrete floor (2008) is showing its wear and tear. Covering concrete floor with epoxy coating is a well proven treatment to protect and provide longevity. Fire Station apparatus floors are treated with epoxy coating and they have held up very well during heavy use conditions.
Project # 17-156
Priority 3 Significant
JustificationThis will give Fire Station 1 flooring a well maintained appearance and will protect the concrete. The original floor was treated with a surface paint which has not held up well to normal fire station foot traffic. Specifically areas in the kitchen and dispatch area are showing extensive wear and tear.
Useful Life
Project Nam Station 1 Floor Coating
Category Buildings
Type Expand or enhance
Contact Darrell Todd
Department Fire
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior18,00018,000Vehicles and Equipment
18,000 18,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
18,00018,000Unfunded
18,000 18,000Total
Friday, November 18, 2016Page 341
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace and upgrade existing video/computer technology in the primary Emergency Operations Center at Fire Station 1.
Current equipment was purchased and installed in 2013.
Project # 17-157
Priority 4
JustificationIt is essential that our EOC maintains state of the art technology. Regular upgrades are essential to meet this need. Technology to be considered for upgrades are video conferencing, displays, computers.
Useful Life
Project Nam EOC Video/Computer Technology
Category Technology
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Vehicles and Equipment
100,000 100,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
100,000100,000Construction Fund: Equipment Levy
100,000 100,000Total
Friday, November 18, 2016Page 342
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace utility pickup truck according to the equipment replacement schedule. The utility pickup truck is used in many situations such as, transporting equipment/personnel to and from emergency scenes, transporting equipment/supplies to and from training sites, plowing fire stations during winter and it is used in general day-to-day operations.
Project # 17-158
Priority 4
JustificationThis vehicle was purchased in 2008 and was expected to be replaced in 2018 but the service life was extended due to its good condition.
Useful Life
Project Nam Utility Pick-up Truck
Category Equipment and Vehicles
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Vehicles and Equipment
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Construction Fund: Equipment Levy
40,000 40,000Total
Friday, November 18, 2016Page 343
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionUpgrade warning siren #4 (5300 Blake Road). The last time this siren was replaced/upgraded was 1995.
Project # 17-159
Priority 3 Significant
JustificationRegular updates to equipment helps to keep maintenance costs low and ensure the latest in technology.
Useful Life
Project Nam Outdoor Warning Siren #4
Category Infrastructure
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior16,00016,000Vehicles and Equipment
16,000 16,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
16,00016,000Construction Fund: Equipment Levy
16,000 16,000Total
Friday, November 18, 2016Page 344
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 2011 automatic chest compression device.
Project # 17-160
Priority 3 Significant
JustificationThis device is critical tools used during cardiac arrest to provide automatic mechanical chest compressions for patients without a pulse. Clinical findings and best practices have demonstrated that this device can have a significant affect on survivability and patient outcomes.
Useful Life
Project Nam Lucas 2 Chest Compression Device
Category Equipment and Vehicles
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior14,00014,000Vehicles and Equipment
14,000 14,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
14,00014,000Construction Fund: Equipment Levy
14,000 14,000Total
Friday, November 18, 2016Page 345
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace 2001 Pierce 100-foot aerial apparatus (T-90) per replacement schedule.
ENVIRONMENTAL CONSIDERATIONS:Replacing a 20-year old aerial apparatus will provide the latest in environmental and technological advances that are available today.
Project # 17-161
Priority 4
JustificationReplacing a 20-year old aerial apparatus will help keep maintenance costs low. This is are only apparatus that provides aerial support for emergency response.
Useful Life
Project Nam Aerial Apparatus (Tower 90)
Category Equipment and Vehicles
Type Replace or repair
Contact Darrell Todd
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior900,000900,000Vehicles and Equipment
900,000 900,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
900,000900,000Construction Fund: Equipment Levy
900,000 900,000Total
Friday, November 18, 2016Page 346
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe LOGIS consortium provides the City of Edina with its connection to the internet. In late 2016, LOGIS will purchase an advanced firewall that has the ability to interact with software loaded on our PCs. To take advantage of this enhanced security, we will purchase the this agent for each of our 450 computers. The initial purchase price will be approximately $28,000.
Project # 17-162
Priority 2
JustificationThis is software similar to anti-virus that will be critical to keep our computers safe from new threats. Without this software, we will miss out on a key piece of security software offered by LOGIS. LOGIS has recommended all of its member cities install this agent.
Useful Life
Project Nam City of Edina Firewall Agents
Category Technology
Type New
Contact Ryan Browning
Department Communications and Technolog
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior28,00028,000Vehicles and Equipment
28,000 28,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
28,00028,000Construction Fund: Available Funding
28,000 28,000Total
Friday, November 18, 2016Page 347
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionData storage needs are constantly increasing. We have seen large growth in the areas of building security cameras, police squad car and interview cameras and server backups. Over the next three years, we expect even more growth in the areas of GIS and possible police body cameras.
To meet these demands, we would invest in additional network storage. The storage purchases will be targeted at both primary storage as well as backup storage with lower requirements.
Project # 17-163
Priority 2
JustificationThis is a one-time expense to prepare for a number of upcoming projects from various departments. We are attempting to estimate the needs based on the types of projects that we are aware of that have been planned by other departments. Our current infrastructure for network storage cannot accommodate all of the new systems planned by other departments.
Useful Life
Project Nam City of Edina Network Storage
Category Technology
Type Expand or enhance
Contact Ryan Browning
Department Communications and Technolog
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior50,00050,000Vehicles and Equipment
50,000 50,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
50,00050,000Construction Fund: Available Funding
50,000 50,000Total
Friday, November 18, 2016Page 348
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionIn 2013, a decision was made to have the City of Edina host and control the headend playback system for the Southwest Cable Commission's Public and Education Access Channels. Member cities of the Commissions are Edina, Richfield, Eden Prairie, Minnetonka and Hopkins.
At that time, the City of Edina installed a Standard Definition (480i) playback system because our only Cable TV Service Provider, Comcast, could only broadcast the two channels in Standard Definition. Since then, Standard Definition (SD/480i) television has rapidly become an outdated video format and has been replaced by High Definition (HD/1080i). With the addition of CenturyLink as a television service provider, we are now able to broadcast the Public Access and Education Channels in High Definition if we were to upgrade our playback equipment.
This proposed project addresses the above concerns. SWTV is currently receiving bids from different AV vendors that would not only upgrade our current equipment from SD to HD playback, but also add the service of Video On Demand. This service would allow residents to go to a website we designate and choose to watch content on their own time. This would include any submitted school concerts, board meetings, sports, and resident-produced content.
Estimated cost for the initial equipment installation is $60,000, with annual payments of $240 for the Video on Demand service. Based off current estimates, Edina's total share of the project would be approximately $13,300 for the initial equipment installation.
Project # 17-164
Priority 5 Important
JustificationThe City should contribute to this project because it directly affects the ability of residents to broadcast their video content in high definition on local cable access TV channels.
I have polled SWTV’s producers who overwhelmingly would like to upgrade our channels. The school districts in Edina and the other SWTV communities are already shooting their content in High Definition, and a majority of the Public Access Producers are as well. Upgrading our equipment would make it easier for them to submit content because they would not have to down convert the video to Standard Definition as they have been.
In addition, the new equipment could potentially offer residents the ability to stream their video content through the Internet using a Video On Demand service. This is something the Southwest Cable Commission has been looking at possibly acquiring.
Useful Life
Project Nam SWTV HD Upgrade Tightrope Cablecast System
Category Technology
Type Expand or enhance
Contact Dietrich Nissen
Department Communications and Technolog
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior60,00060,000Vehicles and Equipment
60,000 60,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
13,30013,300Construction Fund: Cable PEG
46,70046,700Southwest Cable Commission
60,000 60,000Total
Friday, November 18, 2016Page 349
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionNormandale Park is a 12 acre neighborhood park located at 6501 Warren Avenue South. In the early 1950's, the Normandale Community Service Council notified the Park Board that there was vacant tax forfeited land at this location. They suggested that the City acquire it as a park. The shelter building was built in 1974. A total upgrade of the park was done in 1986-87. A new hockey rink was installed and raised four feet to create an easy access from the warming house to the skating rink. The tennis courts were originally constructed in 1963. The current playground was installed in 2003. The park currently has no master plan to guide planning, development or donation opportunities. Staff regularly receives comments, suggestions and requests from the community regarding donation opportunities and changes requested for the park. A strategic and planned approach is needed.
ENVIRONMENTAL CONSIDERATIONS:A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Project # 17-175
Priority 7 Desirable
JustificationThe Normandale Park shelter building was constructed in the 1974. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 4.2 states - Provide specialized park infrastructure to address under served needs, emerging trends and support year round uses. 4.2.4 states - Require community driven master plans and/or public input process for all projects with greater than $250,000 improvements. Staff is recommending replacing the Normandale ark Shelter building in 2021. The cost of the shelter replacement will exceed $250,000. A park investment of this magnitude necessitates a park master plan in order to ensure the best utilization of the park and new community facility. A master plan would provide the opportunity to protect and preserve the City's environmental asset while also providing an opportunity to gather community input on park utilization and programming. A master plan provides a guide and focus for future development opportunities, capital planning and donation opportunities. Twelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system.
Useful Life
Project Nam Normandale Park Master Plan
Category Parks
Type New
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Planning and Design
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Unfunded
40,000 40,000Total
Friday, November 18, 2016Page 351
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves adding a new brick maintenance shed at Pamela Park that can store equipment used for maintaining the synthetic turf field and other fields at the park.
Project # 17-176
Priority 7 Desirable
JustificationPark Maintenance does not currently have a place to store the required equipment needed to maintain the synthetic turf field at Pamela Park. The equipment is stored at Braemar Field and is trailered to Pamela Park as needed. The size of the building would be 12x30. The installed cost for a metal storage shed is $28,000. This was included in the Pamela Park Improvement project that was completed in 2015 but due to budget constraints was removed from the overall project.
Useful Life
Project Nam Pamela Park Maintenance Storage Shed
Category Buildings
Type New
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior28,00028,000Construction
28,000 28,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
28,00028,000Unfunded
28,000 28,000Total
Friday, November 18, 2016Page 353
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves replacing the roofs on four park shelter buildings. The shelter buildings that needs roofs replaced are located at Todd, Weber, Walnut Ridge, and Cornelia School Parks.
Project # 17-177
Priority 4
JustificationAll of the shelter buildings in this project were built in 1997. The roofs were evaluated to be in poor condition by Facility Manager Tim Barnes. The materials used to replace the roof would be asphalt shingles. The replacement cost to re-do the roof on each building is estimated to be $15,000. Replacing the roofs will improve the protection of the building under the roof, increase of insulation is now required by the building code, increase energy efficiencies and improve appearance. This improvement would help sustain the functionality of the shelter buildings. It will be less expensive to replace the roofs now than to defer the cost into the future.
Useful Life
Project Nam Park Shelter Buildings Roof Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior60,00060,000Construction
60,000 60,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
60,00060,000Unfunded
60,000 60,000Total
Friday, November 18, 2016Page 354
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis project involves the removal of existing rubber flooring and replacing with a heavy traffic quality carpet tile similar to the flooring added at the shelter buildings at Countryside and Pamela Park. The shelter buildings included in this project are located at Strachauer, Normandale, Lewis, Arden and Highlands Parks.
Project # 17-178
Priority 5 Important
JustificationThe shelter buildings were designed and built in the 1970's. The flooring in these buildings is original from 1970. The condition of the current flooring was rated in poor condition on the facilities assessment that was done in 2014. It is important that we replace the flooring for several reasons. Appearance, safety, maintenance action. The cost to replace the flooring is less expensive now that it will be to defer the cost. The cost to replace each building is $5,000.
Useful Life
Project Nam Shelter Buildings Flooring Replacement
Category Buildings
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Construction
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Unfunded
25,000 25,000Total
Friday, November 18, 2016Page 355
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe Edina Senior Center opened in 2002. The Carpet and Vinyl flooring is 14 years old is nearing the end of its useful life. The flooring is showing considerable wear in certain areas and is becoming a safety issue for members and rental participants.
Project # 17-179
Priority 6
JustificationThis project should be done for safety of participants using the facility. We have the senior Program, city meeting and rentals using this facility. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states - Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Senior Center Flooring Replacement
Category Buildings
Type Replace or repair
Contact Donna Tilsner
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior80,00080,000Construction
80,000 80,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
80,00080,000Unfunded
80,000 80,000Total
Friday, November 18, 2016Page 356
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Strachauer Park.
Project # 17-180
Priority 4
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Strachauer Park was installed in 1996. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Strachauer Park was ranked a priority 1. A budget of $125,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states. Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning. The current playground structure does not meet current ADA regulations.
Useful Life
Project Nam Strachauer Park Playground Replacement
Category Parks
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior125,000125,000Vehicles and Equipment
125,000 125,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
125,000125,000Unfunded
125,000 125,000Total
Friday, November 18, 2016Page 357
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionStrauchauer Park is a 4 acre neighborhood park located at 6200 Beard Avenue South. The park was formerly named Beard Park. and was renamed Strachauer Park in honor of Hermann Strachauer who served on the Park Board from 1948 - 1961 and was involved in the early stages of the Edina park system. Mr. Strauchauer was instrumental in putting together the original survey of the city park system and helped secure the 1957 $800,000 bond issue to purchase the 450 acres of the Hays farm property for Braemar Park and to build the city's municipal pool. Strachauer Park was constructed in the early 1960's. At that time it was graded and seeded and had a small portable backstop. The playground equipment was added in 1964 and skating rink with a portable warming house was built in 1967. The permanent warming house was built in 1974 with a new hockey rink and lights. A hard surface basketball court was added with playground equipment in 1972. The existing playground equipment was installed in 1996 and is in need of replacement. The park currently has no master plan to guide planning, development or donation opportunities. Staff regularly receives comments, suggestions and requests from the community regarding donation opportunities and changes requested for the park. A strategic and planned approach is needed.
ENVIRONMENTAL CONSIDERATIONS:A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Project # 17-181
Priority 7 Desirable
JustificationThe Strachauer Park shelter building was constructed in the 1974. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 4.2 states - Provide specialized park infrastructure to address under served needs, emerging trends and support year round uses. 4.2.4 states - Require community driven master plans and/or public input process for all projects with greater than $250,000 improvements. Staff is recommending replacing the Strachauer Shelter building in 2018. The cost of the shelter replacement will exceed $250,000. A park investment of this magnitude necessitates a park master plan in order to ensure the best utilization of the park and new community facility. A master plan would provide the opportunity to protect and preserve the City's environmental asset while also providing an opportunity to gather community input on park utilization and programming. A master plan provides a guide and focus for future development opportunities, capital planning and donation opportunities. Twelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system.
Useful Life
Project Nam Strauchauer Park Master Plan
Category Parks
Type New
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior25,00025,000Planning and Design
25,000 25,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
25,00025,000Unfunded
25,000 25,000Total
Friday, November 18, 2016Page 358
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Todd Park.
Project # 17-182
Priority 5 Important
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Todd Park was installed in 1997. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Todd Park was ranked a priority 2. A budget of $125,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states, Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning.
Useful Life
Project Nam Todd Park Playground Equipment
Category Parks
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior125,000125,000Vehicles and Equipment
125,000 125,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
125,000125,000Unfunded
125,000 125,000Total
Friday, November 18, 2016Page 360
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionVan Valkenburg park is an active park within our parks system, with three fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 40 years old, and is due for replacement and no longer supported. Which means we are unable to secure parts for this system .on top of this the system also uses an excess amount of water and is not efficient.
ENVIRONMENTAL CONSIDERATIONS:Chapter 8 section 3 of our comprehensive plan has set the goal of providing the sustainability of our City water system through preservation and conservation. An improved and updated water irrigation system that is more effective in the metering capability will assist us in accomplishing this goal.
Project # 17-183
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Van Valkenburg Irrigation
Category Parks
Type Replace or repair
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior34,00034,000Construction
34,000 34,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
34,00034,000Unfunded
34,000 34,000Total
Friday, November 18, 2016Page 361
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionWalnut Ridge Park is an active park in our park system whose fields are used by both public athletic leagues and the Edina School system. The field is a "hard pan" type and is a safety concern for play. An irrigation system in conjunction with field turf maintenance, would eliminate this concern. We are looking to irrigate the entire field.
Project # 17-184
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Walnut Ridge Irrigation System
Category Parks
Type Replace or repair
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Construction
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Unfunded
30,000 30,000Total
Friday, November 18, 2016Page 362
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThis is a project to replace the existing playground structure and safety surface at Walnut Ridge Park.
Project # 17-185
Priority 5 Important
JustificationThere are 23 outdoor playground equipment structures throughout the park system. The playground equipment at Walnut Ridge Park was installed in 1997. Park Maintenance devised a system to rank each playground structure estimating use, traffic patterns, worn items, environmental conditions such as wind, rain and sun damage, and imagination in the structure. The playground structures were ranked from one to five, 1 being the highest priority for replacement and 5 being the lowest priority. The playground structure at Walnut Ridge Park was ranked a priority 2. A budget of $125,000 is proposed to provide an accessible and barrier free design which is more costly due to the preferred safety surface. In the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 2.1 states. Identify facilities not meeting community needs and develop plan for replacement, renovation, or decommissioning. The current playground structure does not meet current ADA regulations.
Useful Life
Project Nam Walnut Ridge Park Playground Replacement
Category Parks
Type Replace or repair
Contact Susan Faus
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior125,000125,000Vehicles and Equipment
125,000 125,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
125,000125,000Unfunded
125,000 125,000Total
Friday, November 18, 2016Page 363
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionWeber Park is an active park in our park system whose three fields are used by both public athletic leagues and the Edina School system. The field is a "hard pan" type and is a safety concern for play. An irrigation system in conjunction with field turf maintenance, would eliminate this concern. We are looking to irrigate the entire field.
Project # 17-186
Priority 6
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Weber Park Irrigation System
Category Parks
Type Replace or repair
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior40,00040,000Construction
40,000 40,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
40,00040,000Unfunded
40,000 40,000Total
Friday, November 18, 2016Page 364
Capital Improvement Plan
City of Edina, MN
2017 2021thru
Description"Weber Woods" is a new 15 acre park purchased from the City of Minneapolis in 2016. It is located at 41st and France Avenue and is adjacent to Weber Park in the very NE corner of Edina. 9.77 acres of the park are in Edina and 4.77 acres are in the City of St. Louis Park. The cities of Edina and St. Louis Park have discussed jointly planning and improving the property. The park currently has no master plan to guide planning, development or donation opportunities. A strategic and planned joint approach with the City of St. Louis Park is needed. Currently the park is being used as a very active unofficial off leash dog park and has dirt walking and mountain biking trails. Currently the only official dog park in Edina is a very small park located in the NW corner of the City at VanValkenburg Park. A seasonal dog park is located in the hockey rink at Strachauer Park. One of our most requested amenities is more off leash dog parks.
Project # 17-187
Priority 6
JustificationA MOU will be discussed with the City of St. Louis Park for planning, development and maintenance, but for planning purposes, it is assumed that the City of Edina will assume 2/3 of planning costs and the City of St. Louis park will assume 1/3, based on percentages of property ownership. Coordinating the years of investment with the City of St. Louis Park will be critical. In order to continue to officially operate a safe and standard best practice off leash dog park, fencing and a parking lot are needed. If a community driven master plan is completed in 2017, the official dog park could be added in 2018.
Useful Life
Project Nam Weber Woods Dog Park Fencing & Parking Lot
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior88,00088,000Vehicles and Equipment
88,000 88,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
88,00088,000Unfunded
88,000 88,000Total
Friday, November 18, 2016Page 365
Capital Improvement Plan
City of Edina, MN
2017 2021thru
Description"Weber Woods" is a new 15 acre park purchased from the City of Minneapolis in 2016. It is located at 41st and France Avenue and is adjacent to Weber Park. 9.77 acres of the park are in Edina and 4.77 acres are in the City of St. Louis Park. The cities of Edina and St. Louis Park have discussed jointly planning and improving the property. The park currently has no master plan to guide planning, development or donation opportunities. A strategic and planned joint approach with the City of St. Louis Park is needed. Currently the park is being used as an unofficial off leash dog park and has dirt walking and mountain biking trails. A MOU will be discussed with the City of St. Louis Park for planning, development and maintenance, but for planning purposes, it is assumed that the City of Edina will assume 2/3 of planning costs and the City of St. Louis park will assume 1/3, based on percentages of property ownership. Coordinating the years of investment with the City of St. Louis Park will be critical.
ENVIRONMENTAL CONSIDERATIONS:A park master plan provides an opportunity to protect, enhance and improve resident access to the City's environmental asset. As identified in the Parks, Recreation & Trails Strategic Plan, Strategy in the Natural Resources and Sustainable Parks implementation section: 1.3 states - Increase connections and access to natural areas and environmental resources. 1.3.1 states - Create programs that provide education and get residents outside to experience natural resources throughout the City. 1.3.3 states - Identify low-use park land areas that could be converted to native or low input ground covers to lessen maintenance and provide greater habitat. 1.3.4 states - Incorporate more native landscaping and native gardens into parks.
Project # 17-188
Priority 6
JustificationIn the Parks, Recreation & Trails Strategic Plan in the Implementation Framework, Strategy 4.2 states - Provide specialized park infrastructure to address under served needs, emerging trends and support year round uses. 4.2.4 states - Require community driven master plans and/or public input process for all projects with greater than $250,000 improvements. Investments in storm water improvements, a dog park and off street parking lot will exceed $250,000. A park investment of this magnitude necessitates a park master plan in order to ensure the best utilization of the park and new community asset. A master plan would provide the opportunity to protect and preserve the City's environmental asset while also providing an opportunity to gather community input on park utilization and programming. A master plan provides a guide and focus for future development opportunities, capital planning and donation opportunities. Twelve Key Projects were identified in the Parks, Recreation & Trails Strategic Plan. #11 is: Develop community driven master plans for parks throughout the system.
Useful Life
Project Nam Weber Woods Master Plan
Category Parks
Type New
Contact Ann Kattreh
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior30,00030,000Planning and Design
30,000 30,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
30,00030,000Unfunded
30,000 30,000Total
Friday, November 18, 2016Page 366
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionWooddale Park is an active park in our park system whose field is used by both public athletic leagues and the Edina School system. The field is a "hard pan" type and is a safety concern for play. An irrigation system in conjunction with field turf maintenance, would eliminate this concern. We are looking to irrigate the entire field.
Project # 17-189
Priority 5 Important
JustificationThis is a part of our City Work plan to maintain optimum field operations. The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project follows the mission statement by providing effective and values public services and maintaining a sound public infrastructure to sustain and improve the high quality of life enjoyed by our residents and businesses.
Useful Life
Project Nam Wooddale Park Irrigiation
Category Parks
Type New
Contact Bob Prestrud
Department Park & Recreation
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior20,00020,000Construction
20,000 20,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
20,00020,000Unfunded
20,000 20,000Total
Friday, November 18, 2016Page 368
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionThe current City Hall/Police Department facility opened at 2004 with a budget of $10.4 million. The single-building concept provided management and operational efficiencies for the City. The building was designed to be open and accessible to the public. Over a decade later, the building has served the City well. However, security and staffing needs have changed significantly since 2004.
There is an opportunity to make some physical changes to the building in order to 1) improve security and sight lines, 2) increase efficiency of limited staff resources by combining some customer reception points, and 3) providing some additional training/meeting space. There may also be an opportunity to provide showers and improved nursing facilities.
ENVIRNMENTAL CONSIDERATIONConstruction renovations introduce the opportunity to make improvements to the facility for increased Sustainability and cost-efficiency. At this time, these specific opportunities have yet to be determined or assessed, however the environmental consideration will be included as a part of the project planning process.
Project # 17-190
Priority 3 Significant
JustificationAs a part of the Edina IQS, the City promises to "wisely use City resources, including money, equipment and time. . . show initiative by continuously improving our operations. . . provide the best long-term value for our residents. . . take smart risks and look for innovative solutions." This project is both a product and precondition of these promises. By maximizing the operations within City Hall, we will be better equipped to maximize our services for residents.
Additionally, the City's Mission statement reads "Our mission is to provide effective and valued public service, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." This project improves the safety of our staff and improves the efficiency of our operations. In addition, the renovations allow us to maximize the utility of our spaces in order to meet the needs of both our staff and residents in order to provide the high level of services that our residents demand.
Useful Life
Project Nam City Hall Building Security & Efficiency
Category Buildings
Type Expand or enhance
Contact Lisa Schaefer
Department Administration & HRA
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior250,000250,000Construction
250,000 250,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
250,000250,000Unfunded
250,000 250,000Total
Friday, November 18, 2016Page 369
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionPreparation of a concept-level study to understand the costs and benefits of adding a green lid on top of Highway 100 in between Vernon/50th Street and Eden Avenue - to be known as the Grandview Green. The green lid would provide recreational community space atop a level of covered parking. This project would unify the neighborhoods on the east and west sides of the six-lane divided highway and create opportunities to safely and conveniently serve drivers, pedestrians and bicyclists. This project would also serve as a stimulus to new business and residential development for the areas on both sides of the highway.
ENVIRONMENTAL CONSIDERATION: This project the potential to add green space to cover the pavement below. It could also remove a significant barrier to pedestrians and bicyclists who seek to travel to and through the Grandview commercial district.
Project # 17-191
Priority 4
JustificationThis project supports several objectives identified in Vision Edina, including: - planning key amenities, such as parks, in the neighborhood context to allow neighborhood centers to evolve (pg 7), - developing sidewalk, trail and bicycle networks and expanding transit options (pg 8), - consider the development of small neighborhood business nodes to provide a range of local amenities and services (pg 9), - promote new amenities that area attractive to young families and professionals and can further act as connection points or hubs within the fabric of neighborhoods and development areas (pg 100), and- continue in the practice of being an active participant and leader in the larger Twin Cities regional system (pg 14).
Useful Life
Project Nam Grandview Green Highway Lid-concept study
Category Infrastructure
Type New
Contact Bill Neuendorf
Department Administration & HRA
Status Pending
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior210,00060,000 150,000Planning and Design
60,000 150,000 210,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
110,00060,000 50,000HRA Fund: Centennial Lakes TIF
100,000100,000Unfunded
60,000 150,000 210,000Total
Friday, November 18, 2016Page 371
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionImplement an HRIS system with the ability to manage employee information including employee demographic information, electronic personnel files and time entry, compensation administration, benefits administration, performance management, and possibly talent acquisition.
The functions of the human resources department are critical to supporting departments citywide. In effort to support departments in the most effective and efficient manner, the department would greatly benefit from the implementation of a Human Resource Information System (HRIS) to streamline administrative and transactional tasks not only within the department but also across departments.
Each year, the City hires approximately 10-30 full-time employees and 500 new and returning seasonal employees. Approximately the same number leaves employment each year. There are also numerous changes to individual compensation, benefits, and other information throughout the year. The structure of our current systems includes utilizing JDE software for payroll and compensation information, NeoGov for talent acquisition and onboarding, Apprise for online benefits, and a hosted software managing workplace injuries/OSHA. We also have an informational benefits portal hosted on Edinet. Using multiple systems does not allow us to easily track, change, and access information in an efficient manner.
In past years the HR Department has taken steps to modernize and streamline HR systems. Previously, most HR transactions (job applications, time card entry, benefits elections, etc.) required extensive manual tracking. In 2012, the City launched an online applicant tracking system, NeoGov Insight. In 2015, the City completed rolled out a second phase, NeoGov Onboard, to more efficiently onboard new employees by allowing new employees to complete new employee paperwork online, resulting in paperless processes.
ENVIRONMENTAL CONSIDERATIONS:An HRIS would allow for a significant reduction in the use of paper, toner, and energy as transactions would occur electronically reducing operating costs as well as environmental impact.
COST CONSIDERATIONS:It is anticipated that ongoing costs will be approximatley $100,000 per year.
Project # 17-192
Priority 2
JustificationThe benefits of an HRIS affirm the values set forth in Edina IQS. Edina IQS: Integrity- "We wisely use all City resources, including money equipment and time. We are honest, ethical and transparent in our actions." Quality- "We do accurate, high-quality work. We show initiative by continuously improving our operations. We take smart risks and look for innovative solutions." Service- "We strive to anticipate the needs of others and to exceed their expectations."
HRIS provides greater quality by increasing transparency through centralization and self-service. It improves integrity by providing increased accuracy in transactional tasks and reporting; provides innovative solution to inefficiency. It promotes service as it is more effective service provided to internal and external customer and in a more efficient manner.
In 2017, the City hopes to take the next step in planning for and implementing a new HRIS, which would alleviate most of our current systems, with implementation being completed in 2018. Some of the critical components hosted within the HRIS would ideally include electronic personnel files and timecards, compensation administration, benefits administration, performance management, and possibly talent acquisition.
• Data integration: Data integrity, improved consistency, and redundant data entry is alleviated.
Useful Life
Project Nam HRIS
Category Technology
Type New
Contact Kelly Curtin
Department Human Resources
Status Active
Friday, November 18, 2016Page 372
Capital Improvement Plan
City of Edina, MN
2017 2021thru
• Reporting: Accurate and consolidated reports on compensation, benefits, performance reviews, disciplinary actions, and other pertinent employee information. Alleviates the need for manual intervention across multiple systems; reports located in one system.• Benefits: Streamlines the administration of employee benefits. Will ideally have self-service capabilities to monitor coverage elections.• Talent Acquisition: Hiring managers and HR work off of one system so there will be faster and more streamlined tracking and evaluation of applications, resulting in an increased efficiency among supervisors. • Employee Self-Service: Convenient for employees to view different personnel data, benefits, pay, etc.• Scalability: Will allow us to function efficiently on a small scale yet as the city continues to grow, we will be able to better keep up with a growing number of users, transactions and process complexities.
The useful life of an HRIS is anticipated to be ten years.
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior100,000100,000Software
20,00020,000Installation/Maintenance
100,000 20,000 120,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
120,000100,000 20,000Construction Fund: Equipment Levy
100,000 20,000 120,000Total
Friday, November 18, 2016Page 373
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace two (2) 2008 Chevrolet Tahoe vehicles according to the equipment replacement schedule. These vehicle are utilized by fire command staff for emergency response and day to day activity.
Project # 17-193
Priority 5 Important
JustificationRegular replacement of these vehicles because of the high mileage and emergency response activity after 10 year service life is critical to keep maintenance costs low.
Useful Life
Project Nam Fire Command Staff Vehicles (2019)
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Schmitz
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior70,00070,000Vehicles and Equipment
70,000 70,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
70,00070,000Construction Fund: Equipment Levy
70,000 70,000Total
Friday, November 18, 2016Page 374
Capital Improvement Plan
City of Edina, MN
2017 2021thru
DescriptionReplace hydraulic rescue tools - power unit, spreader, cutter, ram and assorted support equipment according to the equipment replacement schedule. This equipment is a critical component for rescuing victims in vehicles and/or other forms of entrapment. The tools were scheduled for replacement in 2021.
Project # 17-194
Priority 3 Significant
JustificationWhen the circumstance calls for this type of tool to be used its reliability must be 100%. Regular updates to equipment helps to keep maintenance costs low and ensure that reliability. In addition, replacing these tools on a regular basis ensure they meet the demands of a rapidly changing environment, i.e. rescue tool advances must meet the advances in vehicle technology.
Useful Life
Project Nam Hydraulic Rescue Tools Replacement (2021)
Category Equipment and Vehicles
Type Replace or repair
Contact Tom Schmitz
Department Fire
Status Active
TotalExpenditures 2017 2018 2019 2020 2021 FuturePrior60,00060,000Construction
60,000 60,000Total
TotalFunding Sources 2017 2018 2019 2020 2021 FuturePrior
60,00060,000Construction Fund: Equipment Levy
60,000 60,000Total
Friday, November 18, 2016Page 375
EMERGENCY TELEPHONE LIST
The City of Edina’s emergency telephone list compiles a list of the important parties to notify in the event of an emergency.
Attachment City of Edina
Emergency Telephone List Emergency Response Team Name Work Telephone Alternate Telephone
Emergency Response Lead
Alternate Emergency Response Lead
Water Operator Dave Goergen 952.826.0312 - Alternate Water Operator Nathan Kaderlik - - Public Communications Jennifer Bennerotte 952.833.9520 -
State and Local Emergency
Response Contacts Name Work Telephone Alternate Telephone
State Incident Duty Officer Minnesota Duty Officer 800/422-0798 Out State 651-649-5451 Metro County Emergency Director Hennepin County Emergency
Management 612.596.0250 -
National Guard Minnesota Duty Officer 800/422-0798 Out State 651-649-5451 Metro Mayor/Board Chair James Hovland 612.874.8550 - Fire Chief Tom Schmitz 952.826.0332 - Sheriff Richard Stanek 612.348.2347 - Police Chief Dave Nelson 952.826.1610 - Ambulance Edina Fire Department 952.826.0330 - Hospital Fairview Southdale Hospital 952.924.500 - Doctor or Medical Facility
State and Local Agencies Name Work Telephone Alternate Telephone
MDH District Engineer John Freitag 651.201.4669 - MDH Drinking Water Protection 651-201-4700 State Testing Laboratory Minnesota Duty Officer 800/422-0798 Out State 651-649-5451 Metro MPCA St. Paul MPCA 651.296.6300 800.657.3864 DNR Area Hydrologist Jason Spiegel 651.259.5822 - County Water Planner
Utilities Name Work Telephone Alternate Telephone
Electric Company Xcel Energy 800.895.4999 - Gas Company CenterPoint Energy 612.372.4727 - Telephone Company CenturyLink 866.963.6665 - Gopher State One Call Utility Locations 800-252-1166 651-454-0002 Highway Department MNDOT 651.296.3000 800.657.3774
Mutual Aid Agreements Name Work Telephone Alternate Telephone
Neighboring Water System Emergency Water Connection Materials
Technical/Contracted
Services/Supplies Name Work Telephone Alternate Telephone
MRWA Technical Services MN Rural Water Association 800-367-6792 Well Driller/Repair Pump Repair Electrician Plumber Backhoe
Chemical Feed Meter Repair Generator Valves Pipe & Fittings Water Storage Laboratory Engineering firm City of Edina Engineering
Department 952.826.0371 -
Communications Name Work Telephone Alternate Telephone
News Paper Radio Station School Superintendent John Schultz 952.848.4000 - Property & Casualty Insurance
Critical Water Users Name Work Telephone Alternate Telephone
Hospital Critical Use:
Fairview Southdale Hospital 952.924.500 -
Nursing Home Critical Use:
Public Shelter Critical Use:
Appendix 6 Cooperative Agreements for Emergency
Services (Part 2C)
Water Supply Plan Edina, Minnesota
COOPERATIVE AGREEMENTS FOR EMERGENCY SERVICES
INTERCONNECTION WITH CITY OF MINNEAPOLIS, EDEN PRAIRIE, AND BLOOMINGTON
In the event of an emergency the City of Edina can connect to the municipal water supplies of Minneapolis, Eden Prairie, or Bloomington for an alternate water supply.
Appendix 7 Municipal Critical Water Deficiency Ordinance
(Part 2C)
Water Supply Plan Edina, Minnesota
MUNICIPAL CRITICAL WATER DEFICIENCY ORDIANCE
The City of Edina has an ordinance on restricted use periods in the event that a water supply shortage threatens the City. This regulation can be found in the water use portion of the ordinance under Article IV – Water Conservation, Division 1 – Generally, Section 28-233. – Water Emergency.
ARTICLE IV. - WATER CONSERVATION
DIVISION 1. - GENERALLY
Sec. 28-233. - Water emergency.
Whenever necessary to meet a water shortage, the manager may declare a water emergency and promulgate reasonable rules and regulations for the use of water.
Secs. 28-234—28-259. - Reserved.
DIVISION 2. - IRRIGATION BAN
Sec. 28-260. - Definitions.
The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Irrigation.
(1) The term "irrigation" means using an in-ground irrigation system, mechanical sprinkler attached to a hose or an unattended hose.
(2) The term "irrigation" does not include handwatering or watering with a handheld hose. City water may be used for irrigation, subject to the regulations of this division.
(Code 1970; Code 1992, § 1115.02(intro.); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-261. - Even-numbered addresses.
All properties with an address ending with an even digit may use city water for irrigation purposes on even-numbered dates only.
(Code 1970; Code 1992, § 1115.02(1); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-262. - Odd-numbered addresses.
All properties with an address ending with an odd digit may use city water for irrigation purposes on odd-numbered dates only.
(Code 1970; Code 1992, § 1115.02(2); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No.
1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-263. - Watering schedule for certain complexes and homeowners' associations.
Notwithstanding sections 28-261 and 28-262, homeowners' associations and apartment complexes that provide a common irrigation system may water every other day on a day designated by the owner if they registered in advance with the city's public works department.
(Code 1970; Code 1992, § 1115.02(3); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-264. - No midday watering.
No property may use any water for irrigation purposes during the hours of 11:00 a.m. through 5:00 p.m. of any day.
(Code 1970; Code 1992, § 1115.02(4); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-265. - Exempt properties.
Upon written request and approval by the city manager or his designee, the following properties are authorized to irrigate at times other than permitted in sections 28-261 through 28-264:
(1) Nurseries and similar businesses that grow plants, trees or sod for resale;
(2) Publicly owned playfields and parks;
(3) Newly sodded or grass seeded areas for a period of 14 days.
(Code 1970; Code 1992, § 1115.02(5); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-266. - Exempt water sources.
The requirements of sections 28-261 through 28-265 shall not apply to irrigation with privately owned wells or irrigation with water supplied from the City of Minneapolis.
(Code 1970; Code 1992, § 1115.02(6); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No.
1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-267. - Penalty.
Failure to comply with restrictions or prohibitions imposed by this article shall result in a surcharge for water service for each day of violation in an amount set forth in section 2-724, which shall be added to the water bill for the premises on which such violation occurs. The city manager or his designee, shall mail a notice of surcharge to the violator upon imposition of a surcharge.
(Code 1970; Code 1992, § 1115.03; Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Appendix 8 Graph of Ten Years of Annual Per Capita
Water Demand for Each Customer Category (Objective 4 in Part 3B)
Water Supply Plan Edina, Minnesota
TEN YEARS OF ANNUAL PER CAPITA WATER DEMAND
RESIDENTIAL PER CAPITA DEMAND
The City of Edina’s residential per capita water demand has varied over the last ten years. The data from the last five years indicates an overall decreasing trend in residential per capita water demands.
Annual Residential Per Capita Water Demand Year Population Residential Water
Use (MG) Residential Per Capita Demand
2007 47786 1,900.00 109 2008 47837 1,740.00 100 2009 47889 1,776.14 102 2010 47941 1,299.66 74 2011 48262 1,626.57 92 2012 48829 1,833.95 103 2013 49216 1,655.87 92 2014 50261 1,523.99 83 2015 50766 1,514.77 82 2016 51804 1,395.52 74
0
20
40
60
80
100
120
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Wat
er U
se (G
PCD)
Year
Residential Per Capita Demand
PROJECTED RESIDENTIAL PER CAPITA DEMAND
The City of Edina’s projected residential per capita demand was based off of the historical per capita demand from 2012. The projected demand was assumed to be the same as the 2012 demand because 2012 was a drought year, and the system was under stress. Using the 2012 demand conservatively predicts the per capita demand expected for future years.
Projected Annual Residential Per Capita Water Demand
Year Population Residential (GPCD)
2019 51,504 103 2020 51,900 103 2021 52,170 103 2022 52,440 103 2023 52,710 103 2024 52,980 103 2025 53,250 103 2030 54,600 103 2040 55,100 103
103 103 103 103 103 103 103 103 103
0
20
40
60
80
100
120
2019 2020 2021 2022 2023 2024 2025 2030 2040
Per C
apita
Dem
and
(gpc
d)
Year
Projected Residential Per Capita Demand
COMMERCIAL, INDUSTRIAL AND INSTITUTIONAL PER CAPITA DEMAND
The City of Edina’s commercial, industrial and institutional per capita water demand has decreased over the last ten years. Since 2012 the per capita demand has gradually decreased to present day.
Annual Commercial, Industrial, and Institutional Per Capita Water Demand
Year Population C/I/I Water Use (MG)
C/I/I Per Capita Demand
2007 47786 644.40 37 2008 47837 577.70 33 2009 47889 331.54 19 2010 47941 372.93 21 2011 48262 543.38 31 2012 48829 597.00 33 2013 49216 535.91 30 2014 50261 545.84 30 2015 50766 533.77 29 2016 51804 495.60 26
0
5
10
15
20
25
30
35
40
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Wat
er U
se (G
PCD)
Year
Commercial, Industrial and Institutional Per Capita Demand
PROJECTED COMMERCIAL, INDUSTRIAL AND INSTITUTIONAL PER CAPITA DEMAND
The City of Edina’s projected commercial, industrial and institutional per capita demand was based off of the historical per capita demand from 2012. The projected demand was assumed to be the same as the 2012 demand because 2012 was a drought year, and the system was under stress. Using the 2012 demand conservatively predicts the per capita demand expected for future years.
Projected Annual Commercial, Industrial and Institutional Per Capita
Water Demand Year Population Residential
(GPCD) 2019 51,504 33.5 2020 51,900 33.5 2021 52,170 33.5 2022 52,440 33.5 2023 52,710 33.5 2024 52,980 33.5 2025 53,250 33.5 2030 54,600 33.5 2040 55,100 33.5
33.5 33.5 33.5 33.5 33.5 33.5 33.5 33.5 33.5
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
2019 2020 2021 2022 2023 2024 2025 2030 2040
Per C
apita
Dem
and
(gpc
d)
Year
Projected Residential Per Capita Demand
WATER RATE STRUCTURE
The City of Edina uses an increasing block rate structure for the residential, commercial, industrial and institutional water customers they serve. The residential water rates are divided into three different tiers based on the amount of water each customer uses. The City of Edina also purchases water from the City of Minneapolis to use in the Morningside area. The users in this area are billed at one uniform rate. Commercial, industrial and institutional users are split into two tiers based on amount of water each customer uses. For commercial, industrial and institutional irrigation users, water use is billed separately at two tiers.
City of Edina’s Water Rate Structure for Residential Users Type Water Rate Usage Amount (Gallons) Tier 1
(Excludes Morningside Area) $2.23 (Per 1,000
Gallons) 0 – 26,000
Tier 2 (Excludes Morningside Area)
$2.96 (Per 1,000 Gallons)
26,001 – 49,000
Tier 3 (Excludes Morningside Area)
$4.63 (Per 1,000 Gallons)
49,001 and Over
Morningside Area $3.99 (Per 1,000 Gallons)
-
City of Edina’s Water Rate Structure for Commercial, Industrial and Institutional Users
Type Water Rate Usage Amount (Gallons) Tier 1 $2.23 (Per 1,000 Gallons) 0 – 26,000 Tier 2 $2.96 (Per 1,000 Gallons) 26,001 and Over
Tier 1 Irrigation $2.96 (Per 1,000 Gallons) 0 – 26,000 Tier 2 Irrigation $4.63 (Per 1,000 Gallons) 26,001 and Over
Utility Rates
2017 City of Edina Utility Rates
RecyclingFee Type 2018 Fee Frequency/Description
Apartments or Condos (2-8 Units) $6.60 Per Quarter
Double Bungalow $6.60 Per Quarter
Single Family $6.60 Per Quarter
SewerFee Type 2018
FeeFrequency/Description
Apartment Buildings With More Than Four Dwelling Units
$55.98or$5.18
Per Quarter for Each Unit Over FourorPer 1,000 Gallons of Water Used, Whichever is Greater
Commercial and Industrial Buildings, Including Schools and Churches
$62.16or$5.18
Per Water Meter or Approved Sewage Metering Device on PremisesorPer 1,000 Gallons of Water Used During the Quarter, Whichever is Greater
Industrial User Extra-Strength Charges N/A
Issuance of Water Meter N/A Cost of Water Meter (Varies by Size), Plus Handling Charges
Shutting Off or Turning on Water at the City Curb Stop at Customer's Request
$35.00 For Each Turn-on and Each Shut-Off
Enable Google Translate
Page 1 of 5Utility Rates | Edina, MN
6/18/2018https://www.edinamn.gov/355/Utility-Rates
Fee Type 2018 Fee
Frequency/Description
Single-Family Dwellings, Townhouses, Two-Family Dwellings, Apartment Building Containing Four or Fewer Dwelling Units
$62.16or$5.18
Per Quarter Up to and Including 12,000 GallonsorPer 1,000 Gallons Used, Whichever is Greater
Water ServiceFee Type 2018
FeesFrequency/Description
Domestic Accounts Used by: Commercial and Industrial Buildings, Including Schools and Churches
$2.23 Up to 26,000 Gallons
Domestic Accounts Used by: Commercial and Industrial Buildings, Including Schools and Churches
$2.96 Over 26,000 Gallons
Lawn Water Accounts Used by: Commercial and Industrial Buildings, Including Schools and Churches
$2.96 Up to 26,000 Gallons
Lawn Water Accounts Used by: Commercial and Industrial Buildings, Including Schools and Churches
$4.63 Over 26,000 gallons.
Meter Charge $20.33 Per Quarter for Up to 3/4 Inch Meter
Meter Charge $27.73 Per Quarter for 1 Inch Meter
Meter Charge $31.63 Per Quarter for 1-1/4 Inch Meter
Meter Charge $35.57 Per Quarter for 1-1/2 Inch Meter
Meter Charge $57.29 Per Quarter for 2-Inch Meter
Meter Charge $217.53 Per Quarter for 3-Inch Meter
Meter Charge $276.89 Per Quarter for 4-Inch Meter
Meter Charge $350.89 Per Quarter for 6-Inch Meter
Meter Charge $445.62 Per Quarter for 8-Inch Meter
Per 1,000 Gallons for Areas of the City, Except for the Morningside Area
$2.23 Up to 26,000 Gallons
Per 1,000 Gallons for Areas of the City, Except for the Morningside Area
$2.96 26,001 to 49,000 Gallons
Per 1,000 Gallons for Areas of the City, Except for the Morningside Area
$4.63 Over 49,000 Gallons
Per 1,000 Gallons for the Morningside Area $3.99 Per 1,000 Gallons - Morningside
Enable Google Translate
Page 2 of 5Utility Rates | Edina, MN
6/18/2018https://www.edinamn.gov/355/Utility-Rates
Fee Type 2018 Fees
Frequency/Description
Storm Water Drainage Charge $30.27 Per Quarter Pursuant to Formula in City Code Chapter 28, Article Iii, Section 28-210
View All
FAQs◦ How often am I billed?
◦ Is water billed by the quantity used?
◦ How do I get in touch with another utility company?
◦ What if I have further questions?
Enable Google Translate
Page 3 of 5Utility Rates | Edina, MN
6/18/2018https://www.edinamn.gov/355/Utility-Rates
Enable Google Translate
Page 4 of 5Utility Rates | Edina, MN
6/18/2018https://www.edinamn.gov/355/Utility-Rates
Enable Google Translate
Page 5 of 5Utility Rates | Edina, MN
6/18/2018https://www.edinamn.gov/355/Utility-Rates
Appendix 10 Ordinance or Regulations Related to
Water Use (Objective 7 in Part 3B)
Water Supply Plan Edina, Minnesota
ORDINANCES OR REGULATIONS RELATED TO WATER USE
In addition to the ordinance restricting water use in the event of an emergency, the City of Edina also has restrictions on daily water use to promote conservation practices. These restrictions include restricting irrigation to odd/even watering days, and no watering between the hours of 11 AM – 5 PM. More information on these restrictions can be found in the city water ordinance Article IV- Water Conservation, Division 2, Sections 28-261, 28-262, 28-263, 28-264, and on the City’s website.
ARTICLE IV. - WATER CONSERVATION
DIVISION 1. - GENERALLY
Sec. 28-233. - Water emergency.
Whenever necessary to meet a water shortage, the manager may declare a water emergency and promulgate reasonable rules and regulations for the use of water.
Secs. 28-234—28-259. - Reserved.
DIVISION 2. - IRRIGATION BAN
Sec. 28-260. - Definitions.
The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Irrigation.
(1) The term "irrigation" means using an in-ground irrigation system, mechanical sprinkler attached to a hose or an unattended hose.
(2) The term "irrigation" does not include handwatering or watering with a handheld hose. City water may be used for irrigation, subject to the regulations of this division.
(Code 1970; Code 1992, § 1115.02(intro.); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-261. - Even-numbered addresses.
All properties with an address ending with an even digit may use city water for irrigation purposes on even-numbered dates only.
(Code 1970; Code 1992, § 1115.02(1); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-262. - Odd-numbered addresses.
All properties with an address ending with an odd digit may use city water for irrigation purposes on odd-numbered dates only.
(Code 1970; Code 1992, § 1115.02(2); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No.
1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-263. - Watering schedule for certain complexes and homeowners' associations.
Notwithstanding sections 28-261 and 28-262, homeowners' associations and apartment complexes that provide a common irrigation system may water every other day on a day designated by the owner if they registered in advance with the city's public works department.
(Code 1970; Code 1992, § 1115.02(3); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-264. - No midday watering.
No property may use any water for irrigation purposes during the hours of 11:00 a.m. through 5:00 p.m. of any day.
(Code 1970; Code 1992, § 1115.02(4); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-265. - Exempt properties.
Upon written request and approval by the city manager or his designee, the following properties are authorized to irrigate at times other than permitted in sections 28-261 through 28-264:
(1) Nurseries and similar businesses that grow plants, trees or sod for resale;
(2) Publicly owned playfields and parks;
(3) Newly sodded or grass seeded areas for a period of 14 days.
(Code 1970; Code 1992, § 1115.02(5); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-266. - Exempt water sources.
The requirements of sections 28-261 through 28-265 shall not apply to irrigation with privately owned wells or irrigation with water supplied from the City of Minneapolis.
(Code 1970; Code 1992, § 1115.02(6); Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No.
1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
Sec. 28-267. - Penalty.
Failure to comply with restrictions or prohibitions imposed by this article shall result in a surcharge for water service for each day of violation in an amount set forth in section 2-724, which shall be added to the water bill for the premises on which such violation occurs. The city manager or his designee, shall mail a notice of surcharge to the violator upon imposition of a surcharge.
(Code 1970; Code 1992, § 1115.03; Ord. No. 1111; Ord. No. 1111-A1, 9-13-1973; Ord. No. 1111-A2, 5-9-1974; Ord. No. 1111-A3, 7-28-1976; Ord. No. 1111-A4, 11-3-1976; Ord. No. 1111-A5, 3-9-1977; Ord. No. 1111-A6, 6-11-1980; Ord. No. 1111-A7, 7-16-1980; Ord. No. 1111-A8, 8-12-1981; Ord. No. 1111-A9, 3-12-1986; Ord. No. 1111-A10, 11-12-1986; Ord. No. 2007-07, 5-15-2007; Ord. No. 2009-14, 11-2-2009)
IMPLEMENTATION CHECKLIST
The implementation checklist for the City of Edina’s Water Supply Plan has been reviewed and completed throughout the preparation of the Water Supply Plan.
SOURCES OF INFORMATION FOR TABLE 10
The data for Table 10 was found by using the following sources for information.
METROPOLITAN COUNCIL’S MASTER WATER SUPPLY PLAN https://metrocouncil.org/Wastewater-Water/Publications-And-Resources/WATER-SUPPLY-PLANNING/MASTER-WATER-SUPPLY-PLAN-2015/Master-Water-Supply-Plan,-Chapters-1-8.aspx
https://metrocouncil.org/Wastewater-Water/Publications-And-Resources/WATER-SUPPLY-PLANNING/MASTER-WATER-SUPPLY-PLAN-2015/Master-Water-Supply-Plan-Appendix-1-Communitie.aspx
HENNEPIN COUNTY GEOLOGIC ATLAS https://conservancy.umn.edu/bitstream/handle/11299/58491/plate7_poll_sens.pdf?sequence=95&isAllowed=y
LOCAL PLANNING HANDBOOK COMMUNITY PAGES FOR THE CITY OF EDINA, MINNESOTA https://lphonline.metc.state.mn.us/CommPage?ctu=2394621&applicant=Edina
APPENDIX 1: MAPS
A. Metropolitan Area Reference Map
B. Public Water Suppliers
C. Interconnection Status
D. Bedrock Geology
E. Regional Groundwater Flow Directions
F. Long-Term Average Annual Recharge
G. Trout Streams and Calcareous Fens
H. Minnesota Department of Health Drinking Water Protection Areas
I. Minnesota Department of Health Special Well Construction Areas
J. Areas Groundwater Pumping is Likely to Directly Impact Surface Water Features
K. 2030 Model-Projected Drawdown in the Prairie du Chien-Jordan Aquifer
L. 2050 Model-Projected Drawdown in the Prairie du Chien-Jordan Aquifer
M. 2030 Model-Projected Drawdown in the Franconia-Ironton-Galesville Aquifer
N. 2050 Model-Projected Drawdown in the Franconia-Ironton-Galesville Aquifer
O. 2030 Model-Projected Drawdown in Areas Groundwater Pumping is Likely to Impact Surface Water Features
P. 2050 Model-Projected Drawdown in Areas Groundwater Pumping is Likely to Impact Surface Water Features
Q. 2030 Model-Projected Drawdown in the Mt. Simon-Hinckley Aquifer
R. 2050 Model-Projected Drawdown in the Mt. Simon-Hinckley Aquifer
S. Baseflow Measurement Sites
A1-1
InverGroveHieghts
Metropolitan Area Reference Map
Created by the Metropolitan Councilon August Thirteenth 2008. View these datasets online athttp://gis.metc.state.mn.us/makeamap/
0 10 205 Miles
Hugo
Osseo
Orono
Mound
Grant
MayerEdina
Eagan
Anoka
Afton
Rogers
Jordan
Savage
Ramsey
Chaska
Carver
Medina
Dayton
Coates
Blaine
Bethel
WayzataOakdale
Scandia
NewportMendota
Loretto
Hopkins
Hilltop
Hanover
Hampton
Fridley
Waconia
Cologne
Hamburg
Crystal
Bayport
Andover
Woodbury
Woodland
Shakopee
St. Paul
Rockford
Randolph
Plymouth
New Hope
May Twp.
Lilydale
Landfall
Corcoran
Lakeland
Hastings
Ham Lake
Gem Lake
Victoria
Dellwood
Columbus
Champlin
Willernie
Tonka Bay
Shorewood
Shoreview
Roseville
Rosemount
Richfield
Oak Grove
New Trier
Miesville
MaplewoodLong Lake
Lexington
Lakeville
Lake ElmoWatertown
Deephaven
Chanhassen
Prior Lake
Vermillion
Stillwater
North Oaks
Northfield
Lino Lakes
Lauderdale
Greenfield
Farmington
Burnsville
Nowthen
Maple Grove
Hassan Twp.
Empire Twp.
Minneapolis
Sciota Twp.
St. Francis
St. AnthonyRobbinsdale
Mounds View
Minnetrista
Maple Plain
New Germany
Camden Twp.
Benton Twp.
Forest Lake
Eureka Twp.
East Bethel
Helena Twp.
Coon Rapids Centerville
Bloomington
Arden Hills
Sunfish Lake
Ravenna Twp.
Pine Springs
Marshan Twp.
Linwood Twp.
Independence
Hampton Twp.
Hancock Twp.
Waconia Twp.
Eden Prairie
Douglas Twp.
Denmark Twp.
Circle Pines
Belle Plaine
Baytown Twp.
Apple Valley
Blakeley Twp.
West St. Paul
St. Paul Park
Randolph Twp.
Nininger Twp.
Medicine Lake
Little Canada
Golden Valley
Laketown Twp.
Dahlgren Twp.
Cottage Grove
Brooklyn Park
Waterford Twp.
South St. Paul
St. Louis Park
St. Bonifacius
North St. Paul
Greenvale Twp.
Hollywood Twp. Watertown Twp.
Falcon Heights
Stillwater Twp.
New Market Twp.
Sand Creek Twp.
White Bear Lake
St. Marys Point
Louisville Twp.
Elko New Market
Cedar Lake Twp.
Brooklyn Center
Spring Lake Twp.
Oak Park Heights
Belle Plaine Twp.
St. Lawrence Twp.
Credit River Twp.
West Lakeland Twp.
Young America Twp.
San Francisco Twp.
Marine on St. Croix
Inver Grove Heights
Lake St. Croix Beach
Norwood Young America
Grey Cloud Island Twp.
Vermillion Twp
Castle Rock Twp.
Lakeland Shores
NewBrighton
Mississippi
River
MinnesotaRiver
Minnetonka
ColombiaHieghts
Legend
Major Rivers
Lakes
Metropolitan Area
Community Boundary
A1-2
Twin Cities Metropolitan Area Public Water Suppliers
0 10 205 Miles
Metropolitan Council, 8/27/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
City & Township Boundaries
Public Water SuppliersServes Multiple Communities Using Local Source
Community Uses Outside Source
Community Uses Local and Outside Sources
Community Uses Local Source
No Public Water Supply - Private Wells
A1-3
Twin Cities Metropolitan Area Bedrock Geology
0 10 205 Miles
Metropolitan Council, 2/11/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Minnesota Geological SurveyMetropolitan Council
City & Township Boundaries
Geologic Unit Name
DECORAH SHALE
PLATTEVILLE-GLENWOOD FRMS.
ST. PETER SANDSTONE
PRAIRIE DU CHIEN GROUP
JORDAN SANDSTONE
ST. LAWRENCE FORMATION
ST.LAWRENCE-FRANCONIA FRMS.
FRANCONIA FORMATION
IRONTON-GALESVILLE SANDSTONES
EAU CLAIRE FORMATION
MT. SIMON SANDSTONE
RED CLASTIC SERIES
A1-5
Twin Cities Metropolitan Area Long-Term Average AnnualRecharge
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
City & Township Boundaries
Recharge Rate (Inches per Year)0 - 2
2 - 4
4 - 6
6 - 8
8 - 10
10 - 18
A1-7
Minnesota Department of Health Drinking WaterProtection Areas
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Minnesota Department of HealthMetropolitan Council
City & Township Boundaries
Rivers
Drinking Water Supply Management Areas
High or Very High Vulnerability Drinking Water Supply Management Areas
A1-9
Areas Where Groundwater Pumping is Likely to Directly Impact Surface Water Features
0 10 205 Miles
Metropolitan Council, 2/13/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
City & Township Boundaries
Rivers
Lakes
High Potential for Groundwater-Surface Water Interaction
Note: This map was created through aregional assessment of geologic and water table conditions. Additional areas ofgroundwater and surface water interactionmay exist due to local conditions. This map highlights areas where bedrock aquifer pumping is most likely to impact surface water resources.
A1-11
2030 Model-projected Drawdown in the Prairie du Chien-Jordan Aquifer
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
Note: These model results assume long-term average conditions and continueddevelopment of traditional water supplies.Summer conditions may excacerbateshort-term drawdown.
City & Township Boundaries
< 5 feet
5 - 10 feet
10 - 20 feet
20 - 30 feet
30 - 40 feet
> 40 feet
Drawdown Exceeds 50% Available Head
A1-12
2050 Model-projected Drawdown in the Prairie du Chien-Jordan Aquifer
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
Note: These model results assume long-term average conditions and continueddevelopment of traditional water supplies.Summer conditions may excacerbateshort-term drawdown.
City & Township Boundaries
Model-projected Drawdown: 2050< 5 feet
5 - 10 feet
10 - 20 feet
20 - 30 feet
30 - 40 feet
> 40 feet
Drawdown Exceeds 50% Available Head
A1-13
2030 Model-projected Drawdown in Water Table AquifersWhere Groundwater Pumping is Likely to Directly ImpactSurface Water Features
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
City & Township Boundaries
0 - 1 foot
1 - 3.281 feet (1 meter)
3.281 - 5 feet
5 - 10 feet
Greater than 10 feet
Groundwater Pumping Unlikely to Directly Impact Surface Waters
Note: These model results assume long-term average conditions and continueddevelopment of traditional water supplies.Summer conditions may excacerbateshort-term drawdown.
A1-16
2050 Model-projected Drawdown in Water Table AquifersWhere Groundwater Pumping is Likely to Directly ImpactSurface Water Features
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
City & Township Boundaries
Model-projected Drawdown0 - 1 foot
1 - 3.281 feet (1 meter)
3.281 - 5 feet
5 - 10 feet
Greater than 10 feet
Groundwater Pumping Unlikely to Directly Impact Surface Waters
Note: These model results assume long-term average conditions and continueddevelopment of traditional water supplies.Summer conditions may excacerbateshort-term drawdown.
A1-17
2030 Model-projected Drawdown in the Mt. Simon-Hinckley Aquifer
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
Note: These model results assume long-term average conditions and continueddevelopment of traditional water supplies.Summer conditions may excacerbateshort-term drawdown.
City & Township Boundaries
Model-projected Drawdown: 2030< 5 feet
5 - 10 feet
10 - 20 feet
20 - 30 feet
30 - 40 feet
> 40 feet
A1-18
2050 Model-projected Drawdown in the Mt. Simon-Hinckley Aquifer
0 10 205 Miles
Metropolitan Council, 8/26/2009View datasets online at http://gis.metc.state.mn.us/makeamap
Source:Metropolitan Council
Note: These model results assume long-term average conditions and continueddevelopment of traditional water supplies.Summer conditions may excacerbateshort-term drawdown.
City & Township Boundaries
Model-projected Drawdown: 2050< 5 feet
5 - 10 feet
10 - 20 feet
20 - 30 feet
30 - 40 feet
> 40 feet
A1-19
MMAASSTTEERR WWAATTEERR SSUUPPPPLLYY PPLLAANN
Edina Water Supply ProfileOverview of water system and use in the communityThe community owns and operates their own water supply system, with Minneapolis Water Works as a water source for the Mornings
Available approaches to meet current and future demand
1. Conservation2. Groundwater sources3. Stormwater reuse4. Reclaimed wastewater5. Enhanced recharge6. Surface water sources
Number of active public and private DNR-permitted wells and surface water intakes that provide water to residents and businesses in the community
Source
Municipal Wells or intakes in the community
Non-Municipal Wells or intakes in the community
Municipal Wells or intakes outside the community
Mt. Simon-Hinckley (MTSH) 3 0 0
Prairie du Chien-Jordan (PDCJ)
15 12 0
Quaternary (QUAT) 0 0 0
Tunnel City-Wonewoc (TCW)
0 0 0
Multi-aquifer (MULTI) 0 2 0
Surface Water (SW) 0 1 1
Amount of water used, on average, by water appropriation permit holders in key water use cat-egories (chart will be blank if no DNR-permitted wells or intakes provide water in the community)
QUAT
TCW
PDCJ
OTHER
MTSH
SW
MMAASSTTEERR WWAATTEERR SSUUPPPPLLYY PPLLAANN
Municipal Water UseMunicipal water treatment: Radionuclides removal, Other, Organics removal, Manganese removal, Iron re-moval, Corrosion control - Lead/Copper, Fluoride , Disinfection
Rate structure: Flat and Increasing Block depending on customer classification
Permitted amount in 2012: 3000 (million gallons/year)
Reported use in 2012: 2859 (million gallons/year) 7.83 (million gallons/day)Note: this may be higher than permitted amount if, for example, water is purchased from a neighbor
Residential water use per person in 2012: 103 gallons per person per day
Water use by major categories in 2012
Agricultural
Commercial
Non-Revenue
Industrial
Residential
Historical municipal water use in the community
MMAASSTTEERR WWAATTEERR SSUUPPPPLLYY PPLLAANN
Projected municipal water use
2020 2030 2040
Population Served 49,800 52,500 53,000
Total Population 49,800 52,500 53,000
Projected Average Daily Water Use (Million Gal./Day), Plus or Minus 20%
7.92 8.35 8.43
Total Per Capita Water Use (Gal./Person/Day) 159 159 159
What per capita water use would be, if population grew without changing total water use:
157 149 148
Water resource plans and permits that address the following issues support more sustainable water supplies
• State and federal requirements, such as Safe Drinking Water Act standards, conditions identified on water appropriation permits issued by the DNR, water quality permits issued by the MPCA and others
• Potential for water use conflicts and well interference
– Due to the pervasiveness of private wells in the metro area, there exists a potential water use conflict and well interference of all appropriators
• Potential for impacts of groundwater pumping on surface water features and ecosystems
– Surface waters in this area may be directly connected to regional groundwater system
• Significant vulnerability to contamination
– A vulnerable Drinking Water Supply Management Area has been designated in the area
– Travel time from land surface to bedrock aquifers is estimated to be less than 50 years
• Significant uncertainty about aquifer productivity and extent
– Part of the area may not be well-represented by a Minnesota Department of Health aquifer test
– The county geologic atlas is more than twenty years old
– Part of the area may not be represented by a Minnesota Department of Natural Resources or com-munity observation well
Note: Local studies may be underway or completed to provide more information about these issues.
The Metropolitan Council's Local Planning Handbook contains interactive maps of all of these issues, and they are also summarized in Chapter 5 of this Master Water Supply Plan.
As appropriate, incorporate the following actions into plans and programs, consistent with your organization's roles and responsibilities
• Acknowledge the issues above and support partnerships to address them in local water supply plans and water appropriation permit applications.
• Explore and support water demand (water conservation) programs such as incentives, ordinances, educa-tion and outreach, rates and other approaches. The Metropolitan Council Water Conservation Toolbox can support these efforts.
• Promote the evaluation of water conflict and well interface as part of the water appropriation permit re-quest and review process. Before requesting water appropriations, water users in this areas should evalu-ate the need to address water conflict and well interference including a) an inventory of all active domestic and public water supply wells near proposed well locations and b) an analysis of existing water level/water withdrawal data to identify where future drawdowns could affect domestic wells.
MMAASSTTEERR WWAATTEERR SSUUPPPPLLYY PPLLAANN
• Work with partners to evaluate relationships between aquifer withdrawals and surface water features. If a connection is likely, management plans should include aquifer testing, monitoring water levels and pump-ing rates and surface water flow, triggers and actions to protect aquifer levels, a schedule for periodic anal-ysis of data to identify the need for action to mitigate impacts, and a schedule for periodic and timely reporting to DNR.
• Collaborate with partners, including MDH, to support local actions that prevent the spread of contamina-tion. This may include implementation of source-water protection plan measures to mitigate public health risks. Where significant contamination exists, MDH will continue enhanced monitoring, and public water suppliers in the area may need to implement treatment processes to meet Safe Drinking Water Act require-ments and manage pumping to better control the extent and magnitude of contaminant plumes.
• Work with partners to identify opportunities for sharing information, reducing duplicate work, and partner-ing on projects that improve understanding about aquifer productivity and extent.
• Support collaborative efforts to periodically review local water supply risks and potential alternatives to mitigate those risks. Technical advances, regulatory adjustments and sub-regional developments can present new opportunities for local water suppliers to enhance the resiliency, sustainability, and affordabil-ity of their water supplies.
• Continue to work with local, state and federal agencies, as required.
Note: The actions listed above may be underway or completed, and information may be available from local public water suppliers, planners, or water resource managers.
Additional information and guidance is provided in the Local Planning Handbook. Metropolitan Council staff can also provide technical and planning assistance.
MMAASSTTEERR WWAATTEERR SSUUPPPPLLYY PPLLAANN
Water use by major categories in 2012Data not availableHistorical municipal water use in the communityData not available
Water resource plans and permits that address the following issues support more sustainable water supplies
• State and federal requirements, such as Safe Drinking Water Act standards, conditions identified on water appropriation permits issued by the DNR, water quality permits issued by the MPCA and others
• Potential for water use conflicts and well interference
– Due to the pervasiveness of private wells in the metro area, there exists a potential water use conflict and well interference of all appropriators
• Significant uncertainty about aquifer productivity and extent
– Part of the area may not be well-represented by a Minnesota Department of Health aquifer test
Note: Local studies may be underway or completed to provide more information about these issues.
The Metropolitan Council's Local Planning Handbook contains interactive maps of all of these issues, and they are also summarized in Chapter 5 of this Master Water Supply Plan.
As appropriate, incorporate the following actions into plans and programs, consistent with your organization's roles and responsibilities
• Acknowledge the issues above and support partnerships to address them in local water supply plans and water appropriation permit applications.
• Explore and support water demand (water conservation) programs such as incentives, ordinances, educa-tion and outreach, rates and other approaches. The Metropolitan Council Water Conservation Toolbox can support these efforts.
• Promote the evaluation of water conflict and well interface as part of the water appropriation permit re-quest and review process. Before requesting water appropriations, water users in this areas should evalu-ate the need to address water conflict and well interference including a) an inventory of all active domestic and public water supply wells near proposed well locations and b) an analysis of existing water level/water withdrawal data to identify where future drawdowns could affect domestic wells.
• Work with partners to identify opportunities for sharing information, reducing duplicate work, and partner-ing on projects that improve understanding about aquifer productivity and extent.
• Support collaborative efforts to periodically review local water supply risks and potential alternatives to mitigate those risks. Technical advances, regulatory adjustments and sub-regional developments can present new opportunities for local water suppliers to enhance the resiliency, sustainability, and affordabil-ity of their water supplies.
• Continue to work with local, state and federal agencies, as required.
Note: The actions listed above may be underway or completed, and information may be available from local public water suppliers, planners, or water resource managers.
Additional information and guidance is provided in the Local Planning Handbook. Metropolitan Council staff can also provide technical and planning assistance.
Meadowbrook
Mirror
Grass
Arrowhead
Bryant
Cornelia
Edina
Smetana
Anderson
Harriet
Bloomington
EdenPrairie
Edina
Hopkins
Minnetonka
Richfield
St. LouisPark
Minneapolis
Municipal Public Water Supply System Interconnections and Management Areas
0 1 2 30.5
Miles
City of Edina, Hennepin County
Special Well and Boring Construction Areas (MDH)
The community's most recent local water supply plan reports that thepublic water supply system has no interconnections
The community's most recent local water supply plan reports that thepublic water supply system has one or more interconnections
North and East Metro Groundwater Management Area (DNR)
Drinking Water Supply Management Area for Minneapolis/St. Paul
Moderate to Highly Vulnerable Drinking Water Supply ManagementAreas (MDH)
County Boundaries
City and Township Boundaries
Open Water Features
NCompass Street Centerlines
Meadowbrook
Mirror
Grass
Arrowhead
Cornelia
Edina
Smetana
Normandale\Nordmyr
ShadyOak
Wood
Bass Calhoun
Harriet
Bryant
AndersonBloomington
EdenPrairie
Edina
Hopkins
Minnetonka
Richfield
St.LouisPark
Minneapolis
Surface Water and Groundwater Interaction
0 1 2 3 40.5
Miles
City of Edina, Hennepin County
Karst Features (DNR)Spring
Sinkhole
Calcareous Fens
Surface water type (regional screening by Met Council)Disconnected from the regional groundwater system
Recharges aquifers
Receives and discharges groundwater
Supported by upwelling groundwater
Trout Streams (DNR)
County Boundaries
City and Township Boundaries
NCompass Street Centerlines
Other Open Water Features
N inemile Creek
Minneha ha Creek
CemeteryHarriet
Meadowbrook
EdinaMill
PondMirror
HighlandPark Pond
Grass
Arrowhead
Bryant
CorneliaIndianhead
Edina
Smetana
Anderson
Cornelia
Bloomington
Hopkins
EdenPrairie
Edina
Minneapolis
Minnetonka
Richfield
SaintLouisPark
RILEY-PURGATORY-BLUFF CREEK
NINE MILECREEK
MINNEHAHACREEK
Surface Water Resources
0 1 20.5
Miles
Edina, Hennepin County
Watershed Management Organization Boundaries
Watershed Management Organization TypeCounty
Watershed District
Watershed Management Organization
Impaired Lakes (2014 Draft MPCA 303(d) List)
Impaired Rivers & Streams (2014 Draft MPCA 303(d) List)
2014 Priority Lakes
County Boundaries
City and Township Boundaries
Other Lakes and Major Rivers
Other Streams
NCompass Street Centerlines