Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-i
APPENDIX 4.13.1-B
Median Streamflow with and without the Leavitt Reservoir Expansion Project
______________________________________________
Appendix 4.13.1-B-ii Leavitt Reservoir Expansion Project – Final EIS – 2019
This page intentionally left blank
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-1
Part 1: Median Streamflow with and without the Leavitt Reservoir Expansion Project with Minimum Bypass
______________________________________________
Appendix 4.13.1-B-2 Leavitt Reservoir Expansion Project – Final EIS – 2019
This page intentionally left blank
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-3
Appendix 4.13.1-B-4 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-5
Appendix 4.13.1-B-6 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-7
Appendix 4.13.1-B-8 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-9
Appendix 4.13.1-B-10 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-11
Appendix 4.13.1-B-12 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-13
Appendix 4.13.1-B-14 Leavitt Reservoir Expansion Project – Final EIS – 2019
This page intentionally left blank
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-15
Part 2: Median Streamflow with and without the Leavitt Reservoir Expansion Project without Minimum Bypass
______________________________________________
Appendix 4.13.1-B-16 Leavitt Reservoir Expansion Project – Final EIS – 2019
This page intentionally left blank
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-17
Appendix 4.13.1-B-18 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-19
Appendix 4.13.1-B-20 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-21
Appendix 4.13.1-B-22 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-23
Appendix 4.13.1-B-24 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-25
Appendix 4.13.1-B-26 Leavitt Reservoir Expansion Project – Final EIS – 2019
Leavitt Reservoir Expansion Project – Final EIS – 2019 Appendix 4.13.1-B-27
Appendix 4.13.1-B-28 Leavitt Reservoir Expansion Project – Final EIS – 2019
This page intentionally left blank