OUR POWER IS IN OUR PEOPLE
SUBSTATION & SWITCHYARD PROJECT REFERENCES************************************************************************************************
************************************************************************************************
Koontz Electric Company, Inc., (KECI), welcomes an opportunity to make your next
project a success. We maintain a professional and technical staff to support our
experienced field craftsman. We pledge to safely deliver a quality finished product in
a timely manner, and at a competitive cost.
KECI is a diversified heavy industrial electrical contractor. We perform a wide array of
contracts specifically chosen for technical and installation complexities. KECI’s team
supports the total spectrum of power, control, and instrumentation system needs. We
have proudly served Arkansas and the nation for over 60 years. In just the last ten
years we have completed over 300 projects in dollar volume exceeding $300 million.
We have never failed to complete a project.
Numerous repeat customers, universal customer satisfaction, and our strong industry
reputation, is positive feedback that our approach delivers. A fervent commitment to
safety, quality, timely schedules, and cost control, are the keys to our success and
longevity. Our professional office and field staff, diverse work history and over five
decades of experience, uniquely qualify us for the most challenging projects
Koontz Electric Company, Inc. 1223 East Broadway Morrilton, Arkansas 72110 (501) 354-2526 http://www.koontzelectric.com
I N T RODUC T I ON
10626718 / 10621005-001
20-2416 2
JOB LOCATION:
Newport AB Substation758 Hwy 18 ENewport, AR 72112
POC: Justin Hart
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]
START / COMPLETION DATE
9/14/2020 - 3/5/2021
FINAL CONTRACT AMOUNT
$549,945.00
SCOPE OF WORK:
Scope of work for T-1 modifications consisted of removing the
breaker, installing PT, line trap and breaker.
Scope of work for T-2 modifications consisted of furnishing and
installing control house cable tray, installation of all substation
steel, all electrical equipment and all above grade conduit. Pulled
control cable, meggar new cables, installed junction boxes and
terminated new cable. Set all panels in the control house, installed
and removed temp carpet in control house and built and installed
print table. Also included installed all animal mitigation as needed.
SCOPE OF WORK:
NEWPORT AB SUBSTATION T-1 & T-2 MODIFICATIONS
January 4, 2021 / September 14, 20
Entergy Arkansas, LLC5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
EP29586
20-2086
JOB LOCATION:
Plum Point Energy Station2732 S. County Road 623Osceola, AR 72370
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Stephen [email protected]
START / COMPLETION DATE
4/12/2021 - 4/25/2021
FINAL CONTRACT AMOUNT
$176,235.00
SCOPE OF WORK:
Scope of work consisted of motor control center replacement at
Plum Point Energy Station during April Shutdown.
SCOPE OF WORK:
PLUM POINT ENERGY STATION MOTOR CONTROL REPLACEMENT
December 14, 2020
Plum Point Energy Associates2732 S. County Road 623Osceola, AR 72370
CONTRACT NO / AWARD DATE:
OWNER:
4500966114
20-2252
JOB LOCATION:
Mathewson SubstationE890th Street & N2920 RoadPiedmont, OK 73078
POC: Val Smith405.553.8456
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Adam [email protected]
START / COMPLETION DATE
6/2/2020 - 8/30/2020
FINAL CONTRACT AMOUNT
$393,393.00
SCOPE OF WORK:
Scope of work consisted of the installation of line terminal,
buswork, control cable, switches, breakers, arrestors, metering
CTs, fault recorder rack and line rack. Also included structural
physical installation, steel erection, equipment, dirtwork,
foundations, and testing.
This project was completed on time and under budget.
SCOPE OF WORK:
MATHEWSON SUBSTATION / SUBSTATION WORK
June 6, 2020
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
45000968521
20-2253
JOB LOCATION:
Badger SubstationCounty Rd 1360Elmwood, OK
POC: Val Smith405.553.8456
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]
START / COMPLETION DATE
7/8/2020 - 11/30/2020
FINAL CONTRACT AMOUNT
$573,980.00
SCOPE OF WORK:
Scope of work consisted of Installing new 345kV bay and terminal
for new Nexterra Ponderosa Wind Line. Moved the Bluestem
Wind Line to new bay and performed all substation and SPC
SCOPE OF WORK:
BADGER SUBSTATION
July 1, 2020
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
2020.000748
20-2251
JOB LOCATION:
Pintail SubstationNorth side of US 64Garber, OK 73738
POC: Val Smith405.553.8456
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Ben [email protected]
START / COMPLETION DATE
5/27/2020 - 11/20/2020
FINAL CONTRACT AMOUNT
$2,446,321.00
SCOPE OF WORK:
Scope of work consisted of building a new 345kV yard to include,
but not limited to 345kV switches, 345kV breakers, all steel
support structures, and fabricate all aluminum bus and install. Also
included all below and above grade grounding, all above grade
conduit, pull and terminate all associated control cable, build out
the inside of the control house, build and install the relay panels
and all testing and commissioning.
SCOPE OF WORK:
PINTAIL 345kV SUBSTATION
May 21, 2020
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
10608369
20-2902
JOB LOCATION:
Stowell SubstationSR 65Stowell, AR 77514
POC: Cody Collins
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: James [email protected]
START / COMPLETION DATE
4/6/2020 - 8/22/2020
FINAL CONTRACT AMOUNT
$995,780.00
SCOPE OF WORK:
Scope of work consisted of Foundation, Electrical and Relay work.
Replaced transformer T2, installed 69kV circuit switcher, installed
firewall, installed oil containment around transformer T2 and
transformer T1, replaced low side MOS switch, replaced high side
switch with a set of 69kV PTs and removed old PTs and high fuses.
Also included replacing high side switch with a set of 69kV PT's and
removed old PT's and high side fuses.
SCOPE OF WORK:
STOWELL SUBSTATION FOUNDATION, ELECTRICAL & RELAY
April 14, 2020
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10603479
20-2503
JOB LOCATION:
Greyhawk Substation3606 South Rockwood RoadCabot, AR 72023
Justin Hart
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Superintendent: Joey [email protected]: Cory [email protected]
START / COMPLETION DATE
3/1/2020 - 7/19/2020
FINAL CONTRACT AMOUNT
$429,170.00
SCOPE OF WORK:
Scope of work consisted of the installation of electrical equipment, supports, bus and other
components:
· 161kV single phase bus supports (high)
· 161kV single phase bus supports (low)
· 161kV low switch supports
· 161kV high switch support
· H-frame dead end structures
· 13.8kV 50KVA station service with safety switch
· 161kV, 2000A vertical-break switches with associated operating mechanisms
· 161kV, 2000A vertical-break switch with ground switch and associated LLS-II attachment
· 161kV, 2000A vertical-break switch with ground switch and HWS attachment
· 161kV transformer dead end structure
· yard lights
· porcelain post insulators for bus supports
· 161kV circuit switcher
· suspension insulator supports on line dead-end structures and transformer dead end structure
· 15kV breakers
· porcelain insulators on 161kV switches
· 4” schedule 40 aluminum bus with connectors and fitting
· 7 #7 alumoweld shield wire with associated connectors and fittings
· Install 954 ACSR damper cable and jumpers with connectors and fittings
· Install 1272 ACSR jumpers with connectors and fittings
· Install 34.5kV equipment, switches, insulators, bus supports and rigid bus
· Install 34.5kV main breaker, tie breaker, and feeder bay structures
· Install all wire/cable as shown on drawing CB1; includes pulling, stripping, megger testing, and
installation of Burndy YAEV lugs
· Install control house relay panels per drawing LO5, including:
· stand along AC panel
· standalone DC panel
· RTU panel
· RTU Peripheral panel
· MOS panel
· transformer differential panel.
· Install 120/240V AC Automatic transfer switch in control house
· Install battery charger and battery DC switch in control house
· Install ADSS for Telecom (estimated 600 ft.)
· Provide and install above ground conduits
· Install distribution backup pad equipment
· Install Transformer Sump Pump and conduit
This project was completed on time and under budget.
SCOPE OF WORK:GREYHAWK SUBSTATION STEEL & ELECTRICAL
February 24, 2020
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
POC:
10600960
20-2500
JOB LOCATION:
Russellville East Substation3054 East Main StreetRussellville, AR 72802
Justin Hart
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Ben [email protected]
START / COMPLETION DATE
2/1/2020 - 5/31/2020
FINAL CONTRACT AMOUNT
$298,892.00
SCOPE OF WORK:
Scope of work consisted of installation of electrical equipment including breakers, reactors, disconnect
switches, arrestors, lightning masts, aluminum bus and conductor, light fixtures, and support structures.
New Russellville East Reactor Yard:
· 3000 amp 161kV 63kA gas circuit breaker (B1235)
· single phase 3000 amp 161kV 10 Ohm air-core reactors
· 3000 amp 161kV vertical break MOS disconnect switches
· 3000 amp 161kV vertical break disconnect switches
· 161kV tubular low switch support structures
· porcelain post equipment insulators (18 for switches, 24 for reactor supports)
· 4” Sch. 40 aluminum tubing and fittings
· 954 ACSR (Rail) for bundled jumpers
· 954 ACSR (Rail) for bus damping
· H-Frame dead-end structure with bus support beam
· H-frame dead end structure with high bus support beam and 10’ shield masts
· 161kV single phase tubular low bus support structures
· 161kV single phase tubular high bus support structures
· 161kV porcelain post bus support insulators
· 161kV suspension insulators
· 98kV, 115MCOV station class arresters
· 161kV single phase tubular arrester equipment supports structures
· 954 ACSR (Cardinal) for bundled risers
· 75’ static masts
· Provide and install above ground conduit, including flex conduit
· Install above-ground 19#9 copper weld ground pigtails to ground equipment.
Existing Russellville East substation yard:
· 3000-amp 161kV 63kA gas circuit breaker (B1225), including:
o Removal of existing breaker and trap per A3261DD1 through DD4.
o Modification of B1225 foundation (see A3261F08 and A3261SD5)
· new 954 ACSR risers
· Provide and install above ground conduit, including flex conduit
· Install above-ground 19#9 copper weld ground pigtails to ground equipment
This project was completed on time and under budget.
SCOPE OF WORK:RUSSELLVILLE EAST 161KV SUBSTATION REACTORS
January 27, 2020
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
POC:
10600781
20-2501
JOB LOCATION:
Willow Glen Substation2605 Hwy 75St. Gabriel, LA 70776
POC: Monica Tillman
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Michael W [email protected]
START / COMPLETION DATE
1/27/2020 - 9/25/2020
FINAL CONTRACT AMOUNT
$874,051.00
SCOPE OF WORK:
Scope of work consisted of complete decommission and
demolition of generating units 1, 2, 3, 4, and 5.
SCOPE OF WORK:
WILLOW GLEN SUBSTATION DECOMMISSION
January 21, 2020
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
4500950357
20-2250
JOB LOCATION:
Little Sprada Creek Substation2412 Hwy 352Clarksville, AR 72830
POC: Doug Dauman405.553.4871
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Matthew Cotner
START / COMPLETION DATE
1/27/2020 - 4/17/2020
FINAL CONTRACT AMOUNT
$248,328.00
SCOPE OF WORK:
Scope of work consisted of installing two sets of 34.5kV hook
operated switches. Install a set of 69kV CTs and arrestors. Install
two 69kV FIS (Fault Interrupter Switch). Install a new relay panel
with new SEL relays and all associated wiring for panel and all
devices.
SCOPE OF WORK:
LITTLE SPRADA CREEK SUBSTATION
January 7, 2020
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
10599041
19-2509
JOB LOCATION:
Splendora Substation15455 Tram RoadSplendora, Texas 77372
POC: Cody Collins
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Marshal [email protected]
START / COMPLETION DATE
1/1/2020 - 8/30/2020
FINAL CONTRACT AMOUNT
$1,824,836.00
SCOPE OF WORK:
Scope of work consisted of relocating gate, replace 138/13.8kV
transformer T1, replace transformer T1 low side feeder and feeder
bay with main breaker, three feeder breakers and bus tie switch.
Replace transformer T2 low side feeder breakers and feeder bays.
Replace with one main breaker and two feeder breakers. Demo all
existing breakers, breaker foundations, bus foundations, existing
switches and still associated the low side of transformer T1 and
T2. Install firewall, cable trench, run conduit from new equipment
to cable trench and to control house. Relocate gates, extend
grounding gird and install drainage.
This project was completed on time and under budget.
SCOPE OF WORK:SPLENDORA SUBSTATION
REPLACE TRANSFORMERS & INSTALL FIREWALL
January 1, 2020
Entergy Texas, LLC1050 I-10 NorthBeaumont, Texas 77702
CONTRACT NO / AWARD DATE:
OWNER:
10586723
19-2506
JOB LOCATION:
Independence Substation (ISES)555 Point Ferry RdNewark, AR 72562
POC: Jonathan Kooiman
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]
START / COMPLETION DATE
11/4/2019 - 9/30/2020
FINAL CONTRACT AMOUNT
$777,390.00
SCOPE OF WORK:
Scope of work for phase III auto transformers project included:
* Replace existing AT1, 400MVA transformer with new 800MVA
transformer.
* Pull and terminate new cabling
* Install new bus connections
* Install new metering
* Assist in testing and commissioning.
SCOPE OF WORK:
INDEPENDENCE EHV SUBSTATION AUTO TRANSFORMER PHASE III
September 2019
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10583217
19-2505
JOB LOCATION:
Hearne SubstationHWY 79 – Old Mumford RoadHearne, Texas 77859
POC: Marion R. Greene409.347.5027
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Gus [email protected]: Marshal [email protected]
START / COMPLETION DATE
6/24/2019 - 12/21/2019
FINAL CONTRACT AMOUNT
$1,011,544.00
SCOPE OF WORK:
The overall scope of work was to relocate gate, replace
69/13.8kV XFMR T1 with 69/34.5kV XFMR, remove (2) 13.8kV
feeder breakers and install (1) 34.5kV feeder breaker, install (1)
circuit switcher, and demolish existing feeder bays and
foundations.
SCOPE OF WORK:
HEARNE SUBSTATION TRANSFORMER BAY ADDITION
June 2019
Entergy of Texas1050 Interstate 10 NorthBeaumont, TX 77702
CONTRACT NO / AWARD DATE:
OWNER:
10570016
19-2501
JOB LOCATION:
West Helena Substation112 Kesl LaneWest Helena, AR 72390
Justin Hart501.490.4765
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Michael W. [email protected]
START / COMPLETION DATE
1/21/2019 - 8/30/2019
FINAL CONTRACT AMOUNT
$445,997.00
SCOPE OF WORK:
Scope of work consisted of but not limited to the following:
1. Mobilization and inspection of existing yard.
2. All material inventory for the project.
3. All documentation (SWMS)
4. Weekly COSS safety site visits.
5. Removal of structures and identified equipment
6. Install 115kV breakers
7. Install 115kV equipment pedestals including CCVTs, line traps, surge arresters, and
SSVT equipment
8. Install 115kV single phase low & high bus supports
9. Install 115kV H-Frame deadends
10. Install 115kV low & high bus switches & circuit switchers
11. Install dual yard lights
12. Install 13.8kV station service transformer
13. Install lightning
14. Install meter structure and
15. Removal of gas from demoed
16. Install all connectors, terminals, fittings, jumpers, etc
17. Perform Post-Construction Inventory
18. Provide As-Built Drawings prior to demobilization
19. Demobilization
SCOPE OF WORK:WEST HELENA SUBSTATION ELECTRICAL UPGRADE
January 2019
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
POC:
10562859
19-2500
JOB LOCATION:
Moses SubstationHwy 70Forest City, AR 72335
Matt Bowen
GENERAL CONTRACTOR:
PCS2000, LLC11224 Boardwalk DriveBaton Rouge, LA 70816POC: CE Smith
START / COMPLETION DATE
3/1/2019 - 4/30/2019
FINAL CONTRACT AMOUNT
$678,737.00
SCOPE OF WORK:
Scope of work consisted of but not limited to the following:
1. Installation of 161kV steel structures
2. Installation of 161kV equipment and buswork
3. Installation of all above ground conduit
4. Connect ground ‘pigtails’ to steel structures and equipment
Relay & Checkout scope of work consisted of:
1. Mobilization and inspection of existing yard.
2. All documentation (SWMS)
3. Weekly COSS safety site visits.
4. Cable pull at all sites.
5. All demolished cable to be abandoned in place.
6. Terminating all new control house and field cables including
the lugs according to the cable pull list provided by Entergy.
7. Removal and installation of panels at the remote end sites.
8. Installation of new and relocated junction boxes.
9. Meggaring all cables.
10. Offloading and inventorying all materials.
11. Procurement, installation, and removal of carpet in the new
control house.
12. Procurement and installation of cover up on all existing
panels during demolition and removal at remote end sites.
SCOPE OF WORK:
MOSES SUBSTATION ELECTRICAL & RELAY
January 2019
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
SUBCONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Robert [email protected]
POC:
10537392-00032
19-2466
JOB LOCATION:
Jacksonville North Substation2001 Marshall RdJacksonville, AR 72076
POC: Justin Hart501.490.4765
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]
START / COMPLETION DATE
9/11/2018 - 1/31/2019
FINAL CONTRACT AMOUNT
$1,365,350.00
SCOPE OF WORK:
Scope of work consisted of but not limited to the following
• Replace five LV switches
• Replace two HV switches
• Demo circuit switcher and OCB and replace with two circuit
switchers
• Replace two OCB, replace with VCB breakers
• Install new HV bus tie switch
• Replace six relay panels
• Install new RTU Panel
• Pull all associated cable, perform terminations, and
test/checkout all equipment and relays
• Perform other miscellaneous maintenance activities (jumper
upgrades, pin and cap replacements)
SCOPE OF WORK:
JACKSONVILLE NORTH SUBSTATION ELECTRICAL & RELAY
September 2019
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10589074
19-2459
JOB LOCATION:
El Dorado EHV Substation299 Union 320El Dorado, AR 71730
POC: Jonathan Kooiman
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]
START / ESTIMATED COMPLETION DATE
10/1/2019 - 2/28/2021
CONTRACT AMOUNT
$3,666,777.00
SCOPE OF WORK:
Scope of work consists of but not limited to the following:
1. Mobilization and inspection of existing yard.
2. All material inventory for the project.
3. All documentation (SWMS)
4. Weekly COSS safety site visits.
5. Demo of existing equipment shown on drawings.
6. Installation of new equipment and steel shown on drawings.
7. Installation of new bus and fittings shown on drawings.
8. Above grade conduit and grounding.
9. Transportation of 3 transformers from Mabelvale to El
Dorado.
10. Offloading, setting, assembling, and testing transformers at
site.
11. Replacement of breaker B5820.
12. All onsite workers to be CIP approved
SCOPE OF WORK:EL DORADO EHV TRANSFORMER BANK #3
August 2019
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10586611
19-2455
JOB LOCATION:
Bellaire Substation2227 Hwy 65 NorthLake Village, AR 71653
POC: Austin Thompson
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Cory [email protected]
START / COMPLETION DATE
8/12/2019 - 3/1/2020
FINAL CONTRACT AMOUNT
$453,688.00
SCOPE OF WORK:
Scope of work consisted of installation of electrical equipment
including breakers, disconnect switches, CVT’s, line traps, an
SSVT, arrestors, a lightning mast, aluminum bus and conductor,
light fixtures, and support structures. Ductor all bolted
connections in current-carry junctions. Provided test equipment
and test reports.
SCOPE OF WORK:
BELLAIRE SUBSTATION GREEN FIELD DISTRIBUTION
October 15, 2019
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10589074
19-2454
JOB LOCATION:
El Dorado EHV Substation299 Union 320El Dorado, AR 71730
POC: Jonathan Kooiman
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]
START / ESTIMATED COMPLETION DATE
8/19/2019 - 2/22/2021
CONTRACT AMOUNT
$1,498,704.00
SCOPE OF WORK:
Scope of work consist of installation control cable, panels and
control house modifications and above grade conduit and
grounding. It also consist of outage assistance (grounding,
coordination, etc) and McNeil Remote End cable and panel
installation.
SCOPE OF WORK:
EL DORADO EHV SUBSTATION SPOF
August 2019
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
192255
19-2255
JOB LOCATION:
Ranch Road Substation1491 North W. StreetPonca City, OK 74601
POC: Tim [email protected]
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Adam [email protected]
START / COMPLETION DATE
1/27/2020 - 5/10/2020
FINAL CONTRACT AMOUNT
$399,933.00
SCOPE OF WORK:
Scope of work consisted of installing 345kV line terminal to
Frontier Wind II & III. Install 345kV breaker (PCB 381). Install four
3000A breaker disconnect switches. Install one 3000A line
disconnect with a grounding switch.
SCOPE OF WORK:RANCH ROAD SUBSTATION
December 26, 2019
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
4500924574
19-2253
JOB LOCATION:
Maple Road Substation18875 W. Hwy 270Calumet, OK 73014
POC: Jim Page
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]
START / COMPLETION DATE
4/1/2019 - 11/17/2019
FINAL CONTRACT AMOUNT
$600,190.00
SCOPE OF WORK:
The scope of work consisted of constructing a 138-12.5kV
substation including all substaiton structures, for a single bay
configuration, one dead end structure, bus and switch supports.
Also one 12.5kV cap bank, breaker, one cap bank, various
cabinets and switches, various potential transformers,
grounding grid, meggered control cables. Install all interior
control house cabinets, wiring, racks, wireway and relaying.
SCOPE OF WORK:
MAPLE ROAD SUBSTATION 138kV-12.5kV SUBSTATION
3/20/2019
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
4500924744
19-2252
JOB LOCATION:
Moonshine Substation14333 S. 4460 RoadVian, Oklahoma 74962
POC: Jim Page405.553.5919
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: James [email protected]
START / COMPLETION DATE
5/20/2019 - 9/30/2019
FINAL CONTRACT AMOUNT
$699,900.00
SCOPE OF WORK:
Scope of work included:
* Build out 161kV bus to include, three 69kV breakers, three
new dead end structures.
* Install any motor operators and adjust.
* Install various potential transformers.
* All breaker jumper and control wiring and terminations.
* All Control House internals.
* Install all substation grid conductors.
* Install all control cables.
* Megger all outdoor control cables.
* Terminate and lip all relaying cables.
* Spreading of OG&E supplied gravel to 4 inches coverage over
entire substation.
* Installing 4 OG&E supplied oil filters inside drain boxes
SCOPE OF WORK:
MOONSHINE ROAD SUBSTATION
March 21, 2019
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
4500924268
19-2251
JOB LOCATION:
Three Rivers SubstationMuskogee, OK
POC: Keith Stockton405.553.8599
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: James [email protected]
START / COMPLETION DATE
2/1/2019 - 4/30/2019
FINAL CONTRACT AMOUNT
$201,952.00
SCOPE OF WORK:
Scope of work consisted of installation of undergrund control cable,
ground grid and welding of overhead bus.
SCOPE OF WORK:
THREE RIVERS SUBSTATION UNDERGROUND CABLE
3/18/2019
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
18061-02
19-2202
JOB LOCATION:Bryan Substation6845 Rabbit LaneBryan, Texas 77808Braxos County
Paul Chamoun
GENERAL CONTRACTOR:Ampirical Solutions4 Sanctuary Blvd., Suite 100Mandeville, LA 70471Program Manager: Scott Curry985.231-6910
START / COMPLETION DATE
7/9/2019 - 10/26/2020
SCOPE OF WORK:
Scope of work consisted of the installation of all substation
steel, GIS Bus, GIS Breakers, GIS Voltage Transformers, GIS
Switches, and substation lighting for 69kV/138kV switchyards.
Included the installation and termination of all control cables
and local control cabinets. Vacuum and filling of all GIS
equipment, and assist in HI-Pot testing.
Installation of station power for (2) control house, including the
installation of all relay and communication panels, and
miscellaneous power panels within the control houses for
lighting, crane hoist power, receptacles, and lighting.
Installation of transformer blast wall, above grade grounding,
and above grade conduits.
Included installation of various relay panels, substation steel,
substation equipment, substation bus, and control cable for (2)
remote ends.
Included the removal of existing substation steel, equipment,
transformers, and control cables.
This project was completed on time and under budget.
SCOPE OF WORK:BRYAN GIS SUBSTATION
138/69KV REPLACE AUTOS & RECONFIG BUSES
December 2018
Entergy Corporation539 Loyola AvenueNew Orleans, AR 70113
CONTRACT NO / AWARD DATE:
OWNER:
SUBCONTRACTOR:Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]: Robert [email protected]
POC:
10096574
18-2520
JOB LOCATION:
Independence Substation (ISES)555 Point Ferry RdNewark, AR 72562
POC: Jonathan Kooiman
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Joey [email protected]
START / COMPLETION DATE
1/1/2019 - 12/31/2019
FINAL CONTRACT AMOUNT
$749,227.00
SCOPE OF WORK:
Scope of work for phase II auto transformers project included:
* Replace existing AT2
* 400MVA transformer with new 800MVA transformer
* Pull and terminate new cabling
* Install new bus connections
* Install new metering and assist in testing and commissioning
This project was completed on time and under budget.
SCOPE OF WORK:
INDEPENDENCE EHV SUBSTATION AUTO TRANSFORMER PHASE II
January 2019
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10558452
18-2515
JOB LOCATION:
Independence Substation (ISES)555 Point Ferry RdNewark, AR 72562
POC: Jonathan Kooiman
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]
START / COMPLETION DATE
9/21/2018 - 12/31/2018
FINAL CONTRACT AMOUNT
$820,665.00
SCOPE OF WORK:
Scope of work consisted of:
· Installation of sub-grade conduits, pullboxes and ground grid for
new substation sites.
· Installation of concrete encasement for road crossings.
· Install cabling, labeling, and terminating as required by
design/cable pull list.
· Demo existing equipment.
· Install new equipment and steel.
· Install new bus and fittings.
· Install control cable as specified on the cable pull list (estimated
72,000’).
· Install panels and control house modifications.
· Install above grade conduit and grounding.
· Install cable tray in control house.
· Remove jumpers on step up transformer for clearance purposes.
· Demo Tline structure and replace with Deadend structure.
· Complete wire work associated new Deadend structure.
SCOPE OF WORK:
INDEPENDENCE SUBSTATION AUTOTRANSFORMER PHASE I
September 2018
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10556677
18-2514
JOB LOCATION:
Mabelvale Substation12303 Vimy Ridge RdMabelvale, AR 72103
Scott McMahan
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]
START / COMPLETION DATE
8/20/2018 - 8/9/2019
FINAL CONTRACT AMOUNT
$4,861,970.00
SCOPE OF WORK:
Scope of work consisted of:
· Replace existing manhole and sump with 6’x8’ precast manhole and sump pump
· Provide and install below grade conduits from existing trench to new transformer
cabinets
· Install new foundation additions for firewalls
· Install (4 ea) foundation pads for Autos to remain staged at Mabelvale
· Orient timber mats for staging the (3 ea) autos being relocated to El Dorado
· Provide and install below grade conduits from existing trench to standby
transformers via junction box
· Demo all foundations around transformers, backfill and compact
· Demo old reactor block walls
· Fabricate steel for foundations and install
· Provide and install rigid/flex conduit and jumpers to connect the auto bushing
terminals to existing
· Install (2 ea) SS XFMRs and replace 3” neutral bus with 4”
· Install (6 ea) Durasystem fire barrier walls to existing wall foundations to structures
· Install all control cable specified for the project
· Run AC cables and control cables in the yard to each cabinet for existing autos from
AC source to new staging location for existing transformers
· Tie new transformers to existing electrical arrangement on high and low sides
· Reconductor from transformer to 115kV bay for AT1 and AT2 banks
· Install 2 SVT, new marshalling cabinets, and wire
· Replace (7 ea) 500/115kV single phase auto units
· Perform necessary equipment benchmark testing before disassembling the autos
· Remove oil in existing autos
· Disassemble all autos
· Jack and pull four autos to new staging pads in Mabelvale
· Assemble (4 ea) autos back and fill oil
· Complete benchmark testing for re-assembled transformers
· Run AC cables and control cables in the yard to each cabinet for existing autos from
AC source for new transformers
· Complete all necessary testing and commissioning of all new equipment
· Install all equipment as shown in the Mabelvale EHV foundation, electrical, and relay
SCOPE OF WORK:MABELVALE EHV AUTOTRANSFORMERS
August 2018
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
POC:
10550130
18-2513
JOB LOCATION:
London North Substation236 May RoadRussellville, AR 72802
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Superintendent: Joey [email protected]: Justin [email protected]
START / COMPLETION DATE
6/1/2018 - 12/31/2018
FINAL CONTRACT AMOUNT
$1,069,054.00
SCOPE OF WORK:
Foundation scope of work consisted of forming, pouring, and finishing of all
structural and equipment foundations. Installation of sub-grade conduits
and ground grid for new substation sites. Existing substation sites were
expanded or improved. Installation of all sub-grade conduit and fiberglass
pull-boxes. Installation of the ground grid, including sub-grade 4/0 copper,
above grade 19#9 copperweld, and ground rods. Installation of CONCAST pre-
fabricated cable trench. Installation of concrete encasement for road
crossings.
Electrical scope of work consisted of compilation of all nameplate data of all
equipment installed. Installation of electrical equipment, including breakers,
battery installation/test and checkout work, disconnect switches, CVT’s, line
traps, an SSVT, arrestors, a lightning mast, aluminum bus and conductor,
light fixtures and support structures. Ductor all bolted connections in
current-carrying junctions and provide test reports. Drainage holes drilled in
rigid bus tubing for weeping.
Relay scope of work consisted of installing cabling, labeling and terminating.
Installed one standard transformer differential panel with main application
according to Entergy Standard PM3505 Opt. B. Installed one station service
AC panel. Installed a main disconnect device between the station service
transformer and station service AC panel. Installed six 70:1 potential
transformers for three phase low voltage bus potentials. Installed two low
voltage potential junction box for three-phase applications. Installed eight
SEL 2810 fiber converters. Installed one indoor standalone split AC/DC panel
with appropriately sized breakers. Installed one substation battery set and
rack, one battery charger, one battery maintenance switch. Installed one
automatic transfer switch for substation service AC between primary and
secondary AC sources. Installed one 24” RTU Communications panel and one
30” peripheral card panel for alarming and control functions. Installed one
24” MOS control panel for control of the two motor operated line switches.
SCOPE OF WORK:
ELECTRICAL, FOUNDATION & RELAY LONDON NORTH SUBSTATION
May 31, 2018
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
POC:
10546103
18-2510
JOB LOCATION:
Mallory Substation2803 Van Dyke RoadNewport, AR 72112
POC: Justin Hart
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Cory [email protected]
START / COMPLETION DATE
5/7/2018 - 6/25/2019
FINAL CONTRACT AMOUNT
$1,578,401.00
SCOPE OF WORK:
The scope of work included but not limited to all underground work
including foundations, grounding and conduit system. The above
grade electrical is also encompassed in the total scope of work and
includes installation of the steel, bus and fittings, above grade
grounding, above grade conduit, and equipment. The relay/testing
and commissioning of the project includes pulling and terminating
all control and power cables, trimming out the control house, and
testing all equipment.
SCOPE OF WORK:
MALLORY GREENFIELD SWITCHYARD
April 24, 2018
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10546928
18-2511
JOB LOCATION:
Pecan Street Substation1411 Daughtry StreetNewport, AR 72112
POC: Justin Hart
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]
START / COMPLETION DATE
6/12/2018 - 8/21/2019
FINAL CONTRACT AMOUNT
$1,462,276.00
SCOPE OF WORK:
The scope of work included all underground work including
foundations, grounding and conduit systems. The above grade
electrical is also encompassed in the total scope of work and
includes installation of the steel, bus and fittings, above grade
grounding, above grade conduit, and equipment. The relay/testing
and commissioning of the project included pulling and terminating
all control and power cables, trimming out the control house, and
testing all equipment.
SCOPE OF WORK:
PECAN STREET DISTRIBUTION YARD
June 12, 2018
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10541720
18-2508
JOB LOCATION:
Danville Substation600 Hwy 10 WDanville, AR 72833
POC: Bob Wray
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Michael W [email protected]
START / COMPLETION DATE
4/18/2018 - 5/14/2018
FINAL CONTRACT AMOUNT
$413,902.00
SCOPE OF WORK:
Scope of work consisted of electrical, foundation and relay
construction at the Danville 161kV Substation.
SCOPE OF WORK:DANVILLE 161kV SUBSTATION
ELECTRICAL, FOUNDATION & RELAY CONSTRUCTION
April 2016
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
C6PPTSW033
18-2506
JOB LOCATION:
Pleasant Hill Substation424 Solgohachia RoadMorrilton, AR 72110
Justin Hart501.490.4765
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Ben [email protected]
START / COMPLETION DATE
3/26/2018 - 5/31/2018
FINAL CONTRACT AMOUNT
$306,229.00
SCOPE OF WORK:
Scope of work consisted of the instation of electrical and structural
equipment.
• One (1 LOT) disconnect existing PTs from tertiary bus #1 and relocate to
grounding bank "W' structure
• One (1 LOT) connect 6" bus tubing to tertiary bus #1 of the
autotransformers
• One (1 LOT) install 6" bus tubing for tertiary bus #2
• One (1 LOT) install 1272 ACSR damper cables with connectors and fittings
inside 6" bus tubing
• One (1 LOT) install 3" bus tubing for reactor bays
• One (1 LOT) 336 ACSR damper cables with connectors and fittings inside
bus tubing
• Three (3 EA) 34.5kV 3000A vertical-break switch with associated operating
mechanism and associated structures
• Three (3 EA) 3-10MVAR shunt reactors and associated pedestals for each
reactor bay
• Three (3 EA) install 2000A GCB for each reactor bay
• Two (2 EA) install 161 kV CCVT on Band C phase bus with associated
structures in the 161 kV switch yard
• One (1 LOT) attach copperweld ground lead "pigtails" to shield wires,
structural steel, and electrical equipment
• One (1 LOT) install grounding bank, current limiting reactor, and station
seNice and associated "W' structure
• One (1 EA) install lightning mast
• One (1 LOT) install V1 M, V2M, V3M, T1 , T2, S, AND W structures with
associated insulators and jumper cables
SCOPE OF WORK:
PLEASANT HILL SUBSTATION ELECTRICAL
January 2019
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
POC:
10547870-0001
18-2431
JOB LOCATION:
Golden Meadow Substation19547 East MainGolden Meadow, LA 70357
POC: Gary Gauthreaux
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Gus [email protected]: Cory [email protected]
START / COMPLETION DATE
5/1/2018 - 8/1/2018
FINAL CONTRACT AMOUNT
$598,544.00
SCOPE OF WORK:
The scope of work consisted of installation, testing and
commissioning of a new 21 MVAR Capacitor Bank, Capacitor
Protection Panel and new Capacitor Switch Device.
SCOPE OF WORK:
GOLDEN MEADOW SUBSTATION REPLACE CAPACITOR BANK
6/11/2018
Entergy of Louisiana639 Loyola AveNew Orleans, LA 70113
CONTRACT NO / AWARD DATE:
OWNER:
4500915608
18-2250
JOB LOCATION:
Canton Lake Substation1229 Hwy 51Canton, OK 73724
POC: Keith Stockton
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: James [email protected]
START / COMPLETION DATE
1/1/2019 - 1/24/2019
FINAL CONTRACT AMOUNT
$91,215.00
SCOPE OF WORK:
Scope of work included installing all interior grid conductors, all
control cables, terminations and testing.
SCOPE OF WORK:
CANTON LAKE SUBSTATION GROUND GRID & CONTROL CABLE
December 12, 2018
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
10551051
18-2201
JOB LOCATION:
Jefferson Parish SubstationJefferson Parish, LA
POC: Gerald [email protected]
GENERAL CONTRACTOR:
Ampirical Solutions, LLC4 Sanctuary BLVD., Suite 100Mandeville, LA 70471POC: Barry Slater985.809.5526
START / COMPLETION DATE
8/1/2019 - 10/1/2019
FINAL CONTRACT AMOUNT
$425,405.00
SCOPE OF WORK:
Scope of work consisted of the removal of Bays 1 & 2 of the
115kV substation and a new bay added in the same location to
Entergy standards to accommodate connection of the new
generation unit to Michoud 115kV substation. All new relay and
metering panels were installed in the existing control house to
accommodate the station connection and transmission line.
SCOPE OF WORK:
NOPS 115KV INTERCONNECT
September 2018
Entergy of Louisiana639 Loyola AveNew Orleans, LA 70113
CONTRACT NO / AWARD DATE:
OWNER:
SUBCONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]
17102-KOONTZ
18-2200
JOB LOCATION:
Jefferson Parish SubstationJefferson Parish, LA
Mario [email protected]
GENERAL CONTRACTOR:Ampirical Solutions, LLC4 Sanctuary BLVD., Suite 100Mandeville, LA 70471Contact: Barry Slater985.809.5526
START / COMPLETION DATE
6/1/2019 - 7/2/2020
FINAL CONTRACT AMOUNT
$4,389,267.00
SCOPE OF WORK:
Koontz Electric was contracted to perform the electrical portion
of the Jefferson Parish Reliability Improvement Project
upgrading and expanding the electrical power transmission grid
around New Orleans. This contract included work at the
following locations:
* Alliance - Modifications s to 115kV and construction of new
230kV yard
* Barataria - Modifications to 115kV and construction of new
230kV yard
* Churchill - New 230kV Switching Station
* Estelle – Modifications to the existing 230kV yard.
* Ninemile – Modification/Replacement of relay panels in
115kV Control House
* Waterford – Modification/Removal of 230kV equipment and
relay panels. In 230kV control house.
* Westwego –Modification/Removal relay panels in control
house and add new bay for the 2nd Ninemile line.
SCOPE OF WORK:
JEFFERSON PARISH SUBSTATIONS RELIABILITY IMPROVEMENT PROJECT
December 14, 2018
Entergy of Louisiana639 Loyola AveNew Orleans, LA 70113
CONTRACT NO / AWARD DATE:
OWNER:
SUBCONTRACTOR:Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]
POC:
W9128F-18-C-0032
18-2069
JOB LOCATION:
Gavins Point Powerhouse55245 Nebraska HWY 121Crofton, NE 68730
POC: Matthew Hibbert 402-995-2480
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: James Gammill501 [email protected]
START / COMPLETION DATE
8/19/2019 - 10/20/2019
FINAL CONTRACT AMOUNT
$856,658.00
SCOPE OF WORK:
Work at the Gavins Point Powerhouse Switchyard consisted of
upgrading the Transmission Line and Generator Bays by
replacing the eighteen (18) existing 123kV, 2000A group-
operated manually operated disconnect switches, motor
operated disconnect switches, and associated grounding
switches. Also replaced all of the pole top cappin insulators on
the Main Bus and Transfer Bus. Replaced ACSR jumpers and
upleads as necessary to fully upgrade the bays to a 1200A
capacity.
SCOPE OF WORK:
GAVINS POINT DISCONNECT SWITCHES
September 24, 2018
US Army Corps of EngineersOmaha District1616 Capitol AvenueOmaha, Nebraska 68102-4901
CONTRACT NO / AWARD DATE:
OWNER:
W9128F-18-P-0112
18-2068
JOB LOCATION:
Oahe Dam28563 Powerhouse RdPierre, SD 57501
POC: Nadine Catanie
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Stephen [email protected]
START / COMPLETION DATE
8/19/2019 - 1/15/2020
FINAL CONTRACT AMOUNT
$2,810,201.00
SCOPE OF WORK:
The scope of work included replacement of the 13.8kV station
service switchgear. Supply and install a voltage regulator, zig-zag
transformer and resistor, disconnect switches, bus insulators,
panelboards and a dry type transformer. Project required rework
of tublar bus to incorporate new equipment. Civil work included
excavation and installation of new duct bank, new equipment pads
for equipment and containment for the oil filled voltage regulator.
Also integration with the plant, testing, commissioning and
training. This project was completed on time and under budget.
SCOPE OF WORK:
OAHE STATION SERVICE SWITCHGEAR REPLACEMENT
September 20, 2018
USACE - Omaha District1616 Capitol AvenueOmaha, NE 68102-4901
CONTRACT NO / AWARD DATE:
OWNER:
10531947
17-2508
JOB LOCATION:
Manchester SubstationJefferson County, Texas2202 Main AveGroves, TX 77619
POC: Construction Engineer: Martin Luther409.893.5744Operational Coordinator: Luke English409.626.1352
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Jesse Charton
START / COMPLETION DATE
1/1/2018 - 4/11/2018
FINAL CONTRACT AMOUNT
$987,055.00
SCOPE OF WORK:
Scope of work consisted of the installation of new 25MVA
transformer in T1 position. Removal of feeder bay, breaker and
install new. Modification to roll phases on high side of T1.
Removing and installing new foundations, conduit and grounding,
steel, equipment, bus and fittings, cable and testing and
commissioning.
SCOPE OF WORK:
MANCHESTER SUBSTATION YARD EXPANSION
January 2018
Entergy of Texas1050 IH-10 NorthBeaumont, Texas 77702
CONTRACT NO / AWARD DATE:
OWNER:
10516894
17-2500
JOB LOCATION:
Bono Substation432 Hwy 285 N.Damascus, AR 72039
POC: Robert Durham
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Michael [email protected]
START / COMPLETION DATE
6/1/2017 - 11/30/2017
FINAL CONTRACT AMOUNT
$999,754.00
SCOPE OF WORK:
The scope of work included installing two line bays, one
transformer bay with three feeder bays, and a tiebreaker bay for
future expansion provisions. The ultimate installation included a
two-bus arrangement with two line bays with breakers, two
transformer bays, and three feeders per transformer. The
substation cut into the Pleasant Hill to Quitman T-line. Microwave
tower for telecom was installed and ready for RTU. Foundation
work at remote substations was also completed.
SCOPE OF WORK:
BONO SUBSTATION
June 6, 2017
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
172057
17-2057
JOB LOCATION:
OMPA Plant1420 North UnionPonca City, OK 74601
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: James [email protected]
START / COMPLETION DATE
1/1/2018 - 7/31/2018
FINAL CONTRACT AMOUNT
$1,859,756.00
SCOPE OF WORK:
The scope of work consisted of installing a new 69/12.5kV
substation with an owner furnished GSU transformer and 69kV SF6
circuit breaker. KECI also installed a new transmission line to
connect the plant to the existing utility lines and new control and
medium voltage cables to the new equipment located in the
substation. KECI was responsible for the removal of existing
switchgear within the plant, and installing a new owner furnished
15kV and 480V Switchgear and MCC. KECI was also responsible for
the controls interface between the new equipment and Control
Room via hard wired as well as Modbus TCP/IP.
SCOPE OF WORK:
OMPA PLANT/PONCA GENERATING SYSTEM
September 2018
Oklahoma Municipal Power Association (OMPA)2701 West I-35 Frontage RdEdmond, OK 73013
CONTRACT NO / AWARD DATE:
OWNER:
4500924744
17-2051
JOB LOCATION:
Cimarron Substation14945 W. Hwy 66Yukon, OK 73099
POC: Tim Carter
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]
START / COMPLETION DATE
8/7/2017 - 1/1/2018
FINAL CONTRACT AMOUNT
$226,622.00
SCOPE OF WORK:
Scope of work included:
* Remove (2) 345kV, 1600A, 25,000MVA PCB, CO#2309 and
2310.
* Remove (4) 345kV, 1600A, 3 pole, vertical break switch,
302M1, 302La, 382La, 382L2.
* Remove (1) 345kV, 1600A, 3 pole, group operated, vertical
break switch, with ground switch 334 and 334G.
* Install (2) 345kV, 3000A, 40kA, Mitsubishi type, PCB CO# 6134
and 6133
* Install (4) 345kV, 3000A, 3 pole, double side break switch with
motor operator, 302M1, 302L1, 382L1, 382L2.
* Install (1) 345kV, 3000A, 3 pole, double side break switch,
with grounding switch, manual operated, 334 and 334G.
* Replacing (3) 345kV, Trench type, "TEFV 362" CCVT's
* Replacing (1) 345kV, 120A, 2-freq, line trap (A phase only)
with 345kV, 3000A, 2-freq line trap.
SCOPE OF WORK:
CIMARRON SUBSTATION
August 7, 2017
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
162507
16-2507
JOB LOCATION:
Entergy Coly Substation9085 Florida BlvdWalker, Louisiana 70785
GENERAL CONTRACTOR:
Mitsubishi ElectricalPower Products, Inc.547 Keystone DrWarrendale, PA 15086-7538POC: Gary Kunselmen724.591.3696
START / COMPLETION DATE
10/17/2017 - 1/10/2018
FINAL CONTRACT AMOUNT
$526,894.00
SCOPE OF WORK:
At a high – level, the work involved the degassing and removal
of existing GIS bus, installation of a new 3 pole GIS 550kV
breaker and supporting hardware. Installation of new GIS bus,
bus fittings, and support structures. Installation of new SF6-to-
Air GIS bushings and support structures. Installation of Local
Control Cabinet (LCC) and wiring between LCC and breaker.
Installation of grounding and bonding for the entire system.
Assisted with testing and startup / commissioning activities.
SCOPE OF WORK:
COLY SUBSTATION 550kV GIS
March 7, 2017
Entergy of Louisiana
CONTRACT NO / AWARD DATE:
OWNER:
SUBCONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]
10477166-00007
16-2405
JOB LOCATION:
Independence (ISES) Substation555 Point Ferry RdNewark, AR 72206
POC: Lloyd Cambrelcamb91@entergyPOC: Sal Faisal501.490.4722
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Racy [email protected]
START / COMPLETION DATE
7/1/2016 - 7/1/2017
FINAL CONTRACT AMOUNT
$2,697,910.00
SCOPE OF WORK:
Investigation of the job site, pulling all the cable permanent and
temporary, Replacement of access platforms, terminating of all the
cable permanent and temporary, setting all new control panels,
demoing all old control panels, procurement and installation of
cable tray system, above grade conduit temporary and permanent
in the yard, weekly safety visits, material inventory pre and post,
and relay assistance during all the outages. Installation of 20 new
IPO 230kV Breakers, Assembly & Gassing of 16 (of the 20 IPO ABB
Breakers), Degas & Removal of 14 Existing Breakers, Replace 12 161
kV Switches, Associated Electrical Equipment, & Bus.
SCOPE OF WORK:
INDEPENDENCE SUBSTATION RELAY
June 30, 2016
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
W9127N-17-C-0006
16-2028
JOB LOCATION:
John Day Lock & DamI-84 Exit 109 Rufus, OR 97050
POC: Ryan S ShoemakerT 503.808.4628
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: James [email protected]
START / COMPLETION DATE
11/1/2017 - 11/30/2019
FINAL CONTRACT AMOUNT
$3,992,788.00
SCOPE OF WORK:
The scope of work included removal of (4) existing 500kV hydraulic
group-operated disconnect switches & ground switches. Installed
(4) new 500kV motorized group-operated disconnect switches with
electric operators, surge resistors and motor operated grounding
switches. Also included the construction and installation of new
platforms, ladders and walkways for the operator control stations
and maintenance catwalks.
SCOPE OF WORK:
JOHN DAY 500kV DISCONNECT REPLACEMENT
March 21, 2017
USACE - Portland District333 SW 1st AvePortland, OR 97204
CONTRACT NO / AWARD DATE:
OWNER:
4500849144
16-2026
JOB LOCATION:
Fort Smith Substation707 Rutgers RoadFt Smith, AR 72908
POC: Doug Dauman405.553.4871
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]
START / COMPLETION DATE
1/1/2017 - 12/31/2017
FINAL CONTRACT AMOUNT
$4,715,414.00
SCOPE OF WORK:
Expansion of the existing Fort Smith Substation for the
installation of a new 500/161/13.8kV Bus Tie Transformer 2 and
the demolition and rebuilding of the existing 161kV East
Switchyard. The 500kV section will require expansion to the
south to allow fort he addition of a new line terminal position to
the existing 500kV Ring Bus. The transformer section (East) will
require expansion for the addition of a new Bus Tie Transformer
2 and tertiary equipment. The existing 161kV East section
currently operating as a Ring Bus will require to be demolished
completely (including removal of all existing foundation) in
order to be rebuilt (including installation of foundations) and
operate as a breaker-and-half. The transmission line temporary
re-routes and re-terminations will be by T-Line Contractor. The
jumpers from the transmission lines to the bus or equipment
will be by the substation electrical contractor.
SCOPE OF WORK:
FT SMITH SUBSTATION EXPANSION
November 2016
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
10477166-00007
16-2406
JOB LOCATION:
Independence Substation555 Point Ferry RoadNewark, AR 72562
POC: Sal Faisal
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]
START / COMPLETION DATE
5/29/2016 - 1/23/2017
FINAL CONTRACT AMOUNT
$1,242,239.00
SCOPE OF WORK:
Scope of work consisted of setting breakers, demo equipment and
bus. Installation of equipment and bus and doctor all buss
connections.
SCOPE OF WORK:
INDEPENDENCE SUBSTATION ELECTRICAL
April 2016
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10477166
15-2433
JOB LOCATION:
Mabelvale Substation12303 Vimy Ridge RdMabelvale, AR 72103
POC: Scott McMahan
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Joey [email protected]
START / COMPLETION DATE
6/1/2016 - 5/31/2017
FINAL CONTRACT AMOUNT
$1,365,350.00
SCOPE OF WORK:
Scope of work consisted of:
• Installation of all control house internals (AC panels, DC Panels,
relay panels, telecom rack, throwover switches, etc.)
• Pulled all wire from field device to new control house.
• Pulled all wire from new control house to old control house.
• Replaced 3 CCVT’s on Sheridan line. Replace junction boxes.
• Replaced 2 CCVT”s and c line traps on the Wrightsville line.
• Replaced junction boxes.
• Removed all unused panels in 115kV control house.
SCOPE OF WORK:
MABELVALE SUBSTATION SPOF
April 2016
Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
10443358
14-2428
JOB LOCATION:
White Bluff EHV Substation1100 White Bluff RoadRedfield, AR 72132
POC: Bob Wray
GENERAL CONTRACTOR:
Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Racy [email protected]
START / COMPLETION DATE
4/20/2015 - 7/1/2016
FINAL CONTRACT AMOUNT
$3,312,219.00
SCOPE OF WORK:
White Bluff Power Plant is a 1,480 megawatt base load coal-fired
power station in Redfield, Arkansas. It has one of the tallest
chimneys in the world, which was built in 1980. White Bluff
provides 500kV to the Grid.
Koontz Electric scope of work consisted of overseeing the Single
Point Of Failure (SPOF) project at the White Bluff Station. This
project was completed in (13) phases over an eleven month period
and was competed ahead of schedule with no accidents. It includes
but not limited to the following:
* Replace in-kind, (8) 500kV switches
* Install (11) new 500kV switches
* Install (8) new 500kV SF6 breakers
* Replace and install (22) CCVTs
* Install (32) Relay panels
* Pull over 500,000 feet of control cable
SCOPE OF WORK:
WHITE BLUFF EHV SUBSTATION YARD ADDITION
March 2015
Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206
CONTRACT NO / AWARD DATE:
OWNER:
4500765233
14-2013
JOB LOCATION:
Fort Smith EHV Substation701 Rutgers RoadFort Smith, AR 72908
POC: Eugene Jenkins405.557.8699
GENERAL CONTRACTOR:
Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]
START / COMPLETION DATE
11/1/2014 - 3/25/2015
FINAL CONTRACT AMOUNT
$1,202,150.00
SCOPE OF WORK:
Koontz was responsible for dressing, wiring-in, oil filling, testing
and commissioning a 400 MVA, 500/161 kV Transformer #3.
Koontz installed the bus work, switches, foundations, and all
associated work. Koontz also replaced the coax 4R33 for Line
Tuner 4LT33 and provided 52/a contacts for Fault Recorder
Indications.
SCOPE OF WORK:
FORT SMITH EHV SUBSTATION
November 2014
OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149
CONTRACT NO / AWARD DATE:
OWNER:
132004
JOB LOCATION:
Various Substations throughoutOklahoma, including:Memorial SubstationLakeside SubstationCherry Creek SubstationNE 30th SubstationPark Place SubstationPiedmont SubstationRobinson Substation
POC: Doug Dauman405.553.4871
GENERAL CONTRACTOR:
Koontz Electric Company, Inc1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]
START / COMPLETION DATE
11/1/2013 - 11/30/2014
FINAL CONTRACT AMOUNT
$616,354.00
SCOPE OF WORK:
The general scope of work for all 7 OG&E Substations consisted of
installing 12.5kV & 34.5kV distribution breakers, 138/12.5 kV
Distribution Transformers, 138/34.5kV Distribution Transformer
and Replace Relay Panels in a 34.5kV Distribution Breaker.
SCOPE OF WORK:
OG&E VARIOUS SUBSTATIONS OKLAHOMA
OG&E 1200 E I-240 Service RdOklahoma City, OK 73149
CONTRACT NO
OWNER:
13894-26B
13-2003
JOB LOCATION:
Pryor Substation3499 Main StPryor, OK 74361
GENERAL CONTRACTOR:
Whiting Turner300 East Joppa RoadBaltimore, MD 21286POC: George FullerT 713.344.8023F 713.996.8937
START / COMPLETION DATE
10/1/2013 - 7/31/2014
FINAL CONTRACT AMOUNT
$3,174,259.00
SCOPE OF WORK:
Koontz Electric was responsible for the following scope of work:
1. Site fill and grading.
2. Sub base and surface rock.
3. Security fence.
4. All concrete foundations.
5. All grounding
6. Concrete encased duct for 3000 Amp TB4, with (8) 6” SCH 80
PVC. Includes (3) 25KV MV 105, 750 MCM w/ 4/0 GRD per
conduit, and (48) 25KV stress cones.
7. (2) 6” PVC conduits per distribution breaker, and (8) 6” SCH
80 PVC conduits, stubbed outside fence 10 feet.
8. 1”, 2”, 3” communication conduits. Includes added manhole
and pull boxes.
9. Conduit and cabling for transformer circuits, (CT’s, Alarms,
Controls).
10. Oil Containment System.
11. All structural steel.
12. Yard lighting on static masts.
13. HV bus, fittings, station arrestors, and insulators.
14. 300 Amp cable bus.
15. Installation of owner furnished transformer; offloading,
placement, assembly, and oil processing.
16. Installation of switchgear building. Furnish quoted
separately.
17. Crane services for above listed items.
SCOPE OF WORK:
PRYOR SUBSTATION
August 2013
Confidential Client
CONTRACT NO / AWARD DATE:
OWNER:
SUBCONTRACTOR:
Koontz Electric Company, Inc1223 East BroadwayMorrilton, AR 72110Project Manager: Harold Andrews501.242.6140
W9128F-11-C-0068
11-2251
JOB LOCATION:
Garrison Dam PowerhouseRiverdale, ND
POC: Mark Mailander (CO)402.995.2488
GENERAL CONTRACTOR:
Koontz Electric Company, Inc1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]
START / COMPLETION DATE
3/1/2012 - 8/30/2017
FINAL CONTRACT AMOUNT
$25,011,776.00
SCOPE OF WORK:
This project was a design-build project. Koontz Electric was
responsible for detailed design, procurement and installation of
equipment. The powerhouse is undergoing a major rehabilitation
project that has included mechanical work, new turbines and
rewinds, all of which are complete. The current major rehab
activities center on electrical distribution, switch gear, and control
systems. Specifically, the project included modifying the existing
switchyard and building a new 230/115/15kV switchyard with new
transformers, breakers and disconnect switches. The new
230/115kV switchyar was constructed on site adjacent to the
existing switchyard. The new 230/115kV switchyard design was
incorporate the requirements of the United States Army Corps of
Engineers (USACE) and the design standards of Western Area
Power Administration (WAPA). The layout of the new 230/115kV
switchyard was similar to that of the existing switchyard, except it is
slightly rotated to be perpendicular to the existing incoming 230kV
transmission lines. The 230kV side of the new switchyard was
designed to accommodate future 230kV yard expansion. In
addition to the new switchyard, unit breakers were utilized in the
existing switchyard to connect the new switchyard to the existing
generator transformer feeds. All other equipment in the existing
switchyard was removed.
SCOPE OF WORK:
GARRISON DAM SWITCHYARD UPGRADE
September 22, 2011
US Army Corps of EngineersOmaha District1616 Capitol AveOmaha, NE 68102-4901
CONTRACT NO / AWARD DATE:
OWNER:
2 0 2 0 E N T E R G Y M A I N T E N A N C E
Camden N /OCB B3785Searcy Price / SwitchesHighland Substation / MobileMobile Projects / MaintenanceEl Dorado East / UpgradeUnion Power / Replace 4c2West Helena / MobileHarrison W / Replace Bs212Moro / Replace Failed RegulatorWest Memphis EHV / Repair Sw B881Portia / DemoButterfield / MobileMarianna Substation / MobileGurdon / MobileMcgehee Substation / MobileEl Dorado East / MobileJacksonville North Substation / MMcCrory / MobilePoyen Substation / MobileTexas Newton SubstationTexas / WarrenBlytheville NW / Replace Bus S.Berryville / RehabWalnut Ridge / Replace BreakersDell Substation / CIP LightingEl Dorado Substation / CIP LightingHot Springs Substation / CIP LightingIndependence Substation / CIP LightingMagnet Cove Substation / CIP LightSheridan Substation / CIP LightingWrightsville Substation / CIP LightMcNeil Substation / Replace B3210LVB Substation / RelayGurdon Substation / B0321 & CsANO / Failed CCVTsCrossett North / Replace B2894Jonesboro Substation / Assist / PcsEl Dorado Substation / Wyatt / B0Marvel Substation / Install BusNewport Ind Substation / InstallMarianna Substation / Circuit SwTx / Rivtrin SubstationWest Memphis EHV Substation / RepPoyen Substation / Retire 115kv TrRitchie Substation / Replace 230kvIndependence Substation / Repair BusW. Memphis EHV Substation / ReplaceEl Dorado West Substation / HangMarianna Substation / B0342Tx Yankee Doodle Substation / ConWoodward Substation / ReworkNLR Levy Electrical Rehab EntergyNLR Levy Substation / Electrical ReLVB Substation / Grounds RentalUnion Power EHV Substation / SwCamden Maguire / MobileSheridan EHV Substation / ReplaceDatto Substation Mobile Cap BankGreenway Substation / Recloser
WM Lehi Substation / MobileANO / Animal MitigationMontrose Substation / Failed BreaVarner Substation / RMV RegulatorPB Dierks / Failed BreakerSheridan EHV Substation / JumpersEl Dorado EHV Substation / JumperEl Dorado EHV Substation / CCVTsSmackover Substation / Replace CiGlenwood Substation / MobileWest Helena Substation / Failed WGillett Substation / Breaker C268Onan Skid / GeneratorPB Industrial / Failed 15kvWyatt Substation / TrapWhite Bluff Substation / Failed B79Mabelvale Substation / Wire PullMcNeil Substation / Cable PullEbony SS / Replace SS PoleSouthside Substation / FailureThayer South Substation / FailureGilmore Substation / ElectricalAECC Southland Substation / FailedHs EHV / Breaker FailureNewport Ind / ElectricalANO / Pull CableKeo EHV Substation / GeneratorEl Dorado EHV Replace BusMonticello E / Trap & TunerCrossett North Substation / TrapHermitage Substation / B7867Rutherford Substation / FailureSouthside Substation / MobileOmaha Substation / Circuit SwRussellville East / BreakersWoodward Substation / Pull CableMobile Reg / Jumpers And GroundsHS Ind / Circuit SwANO / Cable Through ExpansionAltheimer Substation / Dead End SGarland Substation / Seal RoofLR West Substation / Replace B3314Emerson Substation / Failed RegulatorEl Dorado Newell / Transformer FMobile / SkidsMcNeil EHV Substation / Cable PullEl Dorado Newell / FailedAubrey AECC / Failed B1348Hs EHV / Pull CableEl Dorado EHV / Failed SwDell EHV / Failed CCCVTImboden Substation / Replace LineBrinkley East Substation / B4480Searcy Price / Control HouseDiamond City Substation / MobileMo Thayer - South / Failure
ENTERGY MAINTENANCE SCOPE:KECI performs maintenance onEntergy’s grid performing allaspects of construction onequipment from 15kV to500kV. Maintenance jobs includebut not limited to 115kV-500kVbreaker replacements, 69kV –500kV switch and MODreplacements, animal mitigationinstallation, control panel changeouts, arrestor replacements, mobileequipment installation andremoval. The scope of work areeither planned maintenance oremergency failed work.
CONTACT INFORMATION:Sarah Turner, PESubstation Operations SupervisorArkansas GridT 501.490.5562 M 501.230.6481
2020 TOTAL TO DATE:$3,093,618.96
2 0 1 9 E N T E R G Y M A I N T E N AN C E
HARRISON WEST/REPLACE BS212MORO/REPLACE FAILED REGULATORBLYTHEVILLE AB/BREAKER 1002ALUNDSFORD/MOBILEWHITE BLUFF EHV/INSTALL JUMPERSWEST MEMPHIS EHV/REPLACE SW B8815SHERIDAN EHV/REPLACE ARRESTOPORTIA/DEMOSTEPHENS/MOBILEMAGNOLIA WEST/REPLACE BREAKER A208EL DORADO EHV/REPLACE REACTORBUTTERFIELD/MOBILEMARIANNA/MOBILEGURDON/MOBILEMCGEHEE/MOBILEEL DORADO EAST/MOBILEJACKSONVILLE NORTH/MOBILEMCCRORY/MOBILECASH/MOBILEPOYEN/MOBILEISES EHV/STEEL PLATFORMSCROSSETT SOUTH/REPLACE SWITCHGEARTEXAS/NEWTONTEXAS/WARRENEL DORADO EHV/REPLACE FAILEDLITTLE ROCK PORT/CLEAN UPPINE BLUFF EAST/FAILED TRAPWHITE BLUFF EHV/FAILED SWITCHGEARBASELINE/DEMOTEXAS/DAYTONWEST MEMPHIS/KUHN ROAD REPLACEMENTLUNSFORD/ELECTRICALAECC BRYANT SOUTH/FAILED B4641HELENA CENTRAL/CABLE PULLSTEPHENS/FAILED SWITCHGEAR B0976MCCRORY/FAILED SWITCHGEARBERRYVILLE/REHABMCNEIL/FAILED SPARE TRANSFORMER50MVA/MODIFICATIONWALNUT RIDGE/REPLACE BREAKERSDELL/CIP LIGHTINGEL DORADO/CIP LIGHTINGHOT SPRINGS/CIP LIGHTINGINDEPENDENCE/CIP LIGHTINGKEO/CIP LIGHTINGMABELVALE/CIP LIGHTINGMAGNET COVE/CIP LIGHTINGMAYFLOWER/CIP LIGHTINGPLEASANT HILL/CIP LIGHTINGSHERIDAN/CIP LIGHTINGWHITE BLUFF/CIP LIGHTINGWRIGHTSVILLE/CIP LIGHTINGMCNEIL/REPLACE B3210LVB/RELAYGURDON/B0321 & CSWEST MEMPHIS LEHI/FAILED REGULATORANO/FAILED CCTVSCROSSETT NORTH/REPLACE B2894JONESBORO/ASSISTEL DORADO WYATT/B0684MARVEL/INSTALL BUSNEWPORT IND/INSTALL MOBILE LEAMARIANNA/CIRCUIT SWITCHGEARTEXAS/RIVTRINWEST MEMPHIS EHV/REPLACE B8815POYEN/RETIRE 115KV TRANSFORMERRITCHIE/REPLACE 230KV SWS
ISES/REPAIR BUSEL DORADO WEST/HANG GROUND
ENTERGY MAINTENANCE SCOPE:KECI performs maintenance on Entergy’s grid performing all aspects of construction on equipment from 15kV to 500kV. Maintenance jobs include but not limited to 115kV‐500kV breaker replacements, 69kV – 500kV switch and MOD replacements, animal mitigation installation, control panel change outs, arrestor replacements, mobile equipment installation and removal. The scope of work are either planned maintenance or emergency failed work.
CONTACT INFORMATION:
Sarah Turner, PE
Substation Operations Supervisor
Arkansas Grid
T 501.490.5562 | 8.753.5562
M 501.230.6481
2019 TOTAL TO DATE:
$3,738,631.77
JOB LOCATION / DESCRIPTION:RUSSELLVILLE NORTH/REPLACE CIRCUIT SWFORDYCE/CAP & PINNEWPORT AB/MOBILE & SWB554SHERIDAN EHV/PRCR & INST GENWOODWARD/CABLE PULLMOSES/B5835MAGNOLIA E/MBL & REPLACE CIRC SWMAGNOLIA DOW/ELECTRICALCABOT/MOBILESEARCY PRICE/SWITCHESHIGHLAND/MOBILELITTLE ROCK CHICOT/CIRCUIT SWITCHGEAREL DORADO JACKSON/MOBILE SWHOT SPRINGS W/TRANSFORMER CONNECTIONSEL DORADO E/TRANSFORMER DISCONNECTDANVILLE/PIN & CAPDANVILLE/B0530CAMDEN N/RELAYMARKED TREE/CAP BANKLEACHVILLE/MOBILEHARRISON W/ANIMAL MITIGATIONSTUTTGART RICUSKEY/MOBILESEARCY SOUTH/ANIMAL MITIGATIONHARRISON WEST/B215LEACHVILLE/RECLOSERARKLAHOMA/REPLACE SWITCHGILMORE/BREAKER R215FISHER/FAILED REGULATORBENTON NORTH/REPLACE CIRCUIT SWITCHCARPENTER DAM/BREAKERSMAINTENANCE/MOBILESAECC PINEBERGEN/SW REPLACEMENTBLYTHEVILLE/REPLACE 35KV BREAKERBLYTHEVILLE NORTHWEST/REPLACE CARSTS & SWSCEDAR GROVE/MOBILE TRANSFORMERHOT SPRINGS WEST/DIFF PANELNEWPORT IND/ELECTRICAL UPGRADETHAYER, MO NORTH/B1837BLYTHEVILLE NORTH EAST/REPLACE ARRESTORSBLYTHEVILLE AFB/GRNDS FOR SPXHIGHLANDS/CS MODEL DORADO EAST/UPGRADERUSSELLVILLE EAST/CIRCUIT SWGREEN FORREST SOUTH/GRNDS FR NASSGREENBRIER/FAILED BTLE B5763INDEPENDENCE/B6110OMAHA/RELAYMAGNOLIA STL/FIELD REGULATORWHITE BLUFF/CLEAN UPDELL/TRANSFORMER BUSUNION STATION/SW 4C1CMC STEEL/REPLACE FIELD REGULATORSHERRILL/FAILED REGULATORLONG PLANT/DEMOLITIONCABOT/REPLACE FAILED GROUNDSMORGAN/MOBILEMAGNOLIA WEST/FAILED DISCONNECTMABELVALE/FIELD 13.8KV BREAKEREL DORADO LION OIL/ELECTRIC UPGRADENEWPORT AB/FAILED SW & MOBILECASH/FAILED SW & MOBILE MAGNOLIA WEST/REPLACE CABLEBLYTHEVILLE/LNG PLANT DEMOWEST HELENA/MOBILE
2 0 1 8 E N T E R G Y M A I N T E N AN C E
HELENA CENTRAL/W238WOODWARD/RPLC TRANSFORMRSMCNEIL/TRANSFORMER BANKCND&PUL CBLMGNLIASTEEL/RPLC INSLAKE VLGE BAGBY/RPLC TRAPSYLVAN HILLS/SWITCH B2812LYNCH/PULL DC CABLESHERIDANEHV/PRCR&INST GENARKADELPHIA N/RPLC SWTCHSNLR WESTGATE/RPLC SWITCHMALVERN/MAINTENANCE SWTCHPORT/MOVE MATERIALBATESVILLE/B06372MARKED TREE/JOB/MCCOLONOKE EAST/RPLC CT'SBEARDEN/RPLC FAILED REGCROSSETT WEST/RPLC BREAKRCAMDEN N/CIRC SWITCHERWOODWARD/CABLE PULLANO/LIGHTING ARRESTORSCAMDEN N/OCB B3785ELDORADO EHV/REACTR B0511CAMDEN N/MBL&FAILD BRKR/ENTEWALNUT RIDGE/ANML MITIGTNISES/ASSIST IN WIREWAY/MCCOMOSES/B5835WHT BLUFF EHV/RMV JMPRSDATTO/MOBILE BREATKERMAGNOLIA DOWELL/MOBILEMGNLIA E/MBL&RPLC CIRC SWMAGNOLIA DOW/ELECTRICALNEWARK/B3254ELAINE/ASSIST BRKR CHNGCABOT/MOBILESEARCY PRICE/SWITCHESHIGHLAND/MOBILEANO/GROUNDING TRANSFORMRSLR KANIS/CIRC SWTC REPAIRLR CHICOT/CIRCUIT SWITCHRWHITE BLUFF/SWITCHNEWPORT IND/RPLC REGULATRW MEMPHIS DOVR/RPLC B0188ELDORADO JACKSN/MOBILE SWHELENA CNTRL/XFMR CONECTNELDORADO E/XFMR DISCNECTSEARCY SOUTH/MOBILESTUTTGART RICUSKEY/PTSDANVILLE/PIN&CAPDANVILLE/B0530DANVILLE/BUS DIFF PANELSTUTTGART RICUSKY/RPLC T2ALCOA/ARRESTORSALCOA/CONNECTIONSWALNUT RIDGE/B8751CAMDEN N/RELAY/SHERMARKED TREE/CAP BANKEL DORADO E/MATSELDRDO EHV/RPLC FLD RCTRMALVERN S/RPLC BUSMLVRN S/RPLC BOTTLE ON CSLEACHVILLE/MOBILEMONTICELLO E/JUMPERSHARRISON W/ANIML MITIGATNSTUTTGART RICUSKEY/MOBILESEARCY SOUTH/ANIML MITGTNLVB/TRAP & CCVTHARRISON WEST/B215
EL DORADO EAST/MATSNEWARK/FAILED CTPB DIERKS/SWITCHLEACHVILLE/RECLOSERCHERRYVALLEY/FLD BRKR ASTMGNLA DWELL/LKG XFMR MOBLGILLETT/ASSIST BREAKERWALNUT RDGE W/GRNDS&JMPRSCORNING/ARRESTORSARKLHOMA/FAILED B1040ARKLAHOMA/RPLC SWITCHMAGNLA DOW/CLNUP&XFMR RPRGILMORE/BREAKER R215DUMAS/FAILED SWITCHESFISHER/FAILED REGULATORWALNUT RIDGE/35KV BREAKERAECC GLENDALE/REBLD SWTCHBENTON N/RPLC CIRCUIT SWCARPENTER DAM/BREAKERSMAINTENANCE/MOBILESCEDAR GROVE/MOBL TRNSFRMRHS WEST/DIFF PANELNEWPORT IND/ELECTL UPGRDTHAYER N/B1837BLYTHVL NE/RPLC ARRESTORSBLYTHVL AFB/GRNDS FOR SPXHIGHLAND/CS MODEL DORADO EAST/UPGRADERUSSELLVILLE E/CIRCUIT SWGRN FORST S/GRNDS FR NASSGREENBR/FAILED BTLE B5763INDEPENDENCE/B6110OMAHA/RELAYMAGNOLIA STL/FLD REGULATRDELL/TRANSFORMER BUSUNION STATION/SW 4C1SHERRILL/FAILED REGULATOR/ENTE
ENTERGY MAINTENANCE SCOPE:KECI performs maintenance on Entergy’s grid performing all aspects of construction on equipment from 15kV to 500kV. Maintenance jobs include but not limited to 115kV‐500kV breaker replacements, 69kV – 500kV switch and MOD replacements, animal mitigation installation, control panel change outs, arrestor replacements, mobile equipment installation and removal. The scope of work are either planned maintenance or emergency failed work.
CONTACT INFORMATION:
Sarah Turner, PE
Substation Operations Supervisor
Arkansas Grid
T 501.490.5562 | 8.753.5562
M 501.230.6481
2018 TOTAL TO DATE:
$3,903,792
JOB LOCATION / DESCRIPTION:COFER/34.5KV SWITCHLR CMCK/RPLCHS EHV/CCVTHARRISON E/RPLC B1636STRONG/JUMPERS ON T1NEWPORT/MOBILEJUNCTION CITY/RELAYMANN RD/ADD FEEDER BAYSSTUTGRT RCKSY/RPLC BRK T1FISHER/FAILED 15KV BREAKRHERIDAN/GENERATOR TESTGCUSHMAN/MOBILE&SWCUSHMAN/SW B0449PORT/CLEAN UP YARDBATSVLE/RPLC SW C&P ARSTRDARDANELLE/CAP&PINRSVL NORTH/RPLC CIRCUITSWMVA MOBILE/REPAINTMOBILE/161KV SWITCH TRLRCHRRYVALY/ANML MTGTN&MOBLFORDYCE/ANIMAL MITIGATIONELDORADO NEWLL/ANML MTGTNHARRISON EAST/DIFF PANELCHERRYVALLEY/MOBILEFORDYCE/CAP & PINFORDYCE/115KV CAP & PINDATTO/MOBILE CAP BANKSEARCY PRICE/CAP&PINEARCY PRICE/RPLC B4153NEWPORT AB/MOBILE&SWB554HARRISON EAST/RPLC LN TRPHARRISON E/RPLC B5136NEWPORT/FAILED A TOWERGREEN FOREST N/SW FAILURECARPNTR DAM/ANML MITIGATNANO/CABLE PULLW MEMPHIS EHV/B2600 BRKRGURDON/REMVE OLD EQUIPMNTPB PORT/RPLC FAILED EQUIPJACKSNVILE N/RECONFIG BUSCEDAR GROVE/MOBILEHARRISON E/DELIVR MATRIALBAUCUM/MOBILEDRIVER/PULL CABLEEL DORADO PARNELL/MOBILEELDORADO LION/RPLC 2 SWSLR WEST/RPLC B3314NEWPORT/MOBILEELDORADO LION/MOBILEMARKED TREE/MOBILENEWARK/MOBILEDRIVER/HARDENINGBAUCUM/FAILED FEED BRKRDANVLLE/FAILD SWTCH B2530DRIVER/RPLC FAILD REACTORANO/B8351ANO/ADSSNEWARK/RPLC SW B3257SAGE/MOBILE WORKPOWERLINE/HARDENINGMONETTE JCT/DEMOMALVERN/ISOLATE SWGRHUTTIG/MOBILEFORREST CITY/TOWER LGTSNEWPORT IND/INSULATORSHUTTIG/RPLC CIRC SWTR&TWRANO/RPLC PT'S
2 0 1 7 E N T E R G Y M A I N T E N AN C E
GOODWIN ROAD/REPLACE CTS/ENTE
GREEN FORREST SOUTH/ADD TRANSFORMER
BAY/ENTE
HARDY NORTH/FIBER/ENTE
HARRISON EAST/DELIVER MATERIAL/ENTE
HELENA CENTRAL/W238/ENTE
HUTTIG/MOBILE/ENTE
HUTTIG/REPLACE CIRCUIT SWITCHER &
TOWER/ENTE
INDEPENDENCE/HARDENING/ENTE
Independence/SF6 MOVE/ENTE
JACKSONVILLE N/RECONFIGURE BUS/ENTE
JACKSONVILLE NORTH/MOBILE BREAKER/ENTE
KANIS/ELECTRICAL/ENTE
KEO/B4941 & JUMPERS/ENTE
LAKE VILLAGE BAGBY/RPLC TRAP/ENTE
LITTLE ROCK EAST/RPLC SWITCH B0186/ENTE
LONOKE EAST/RPLC FAILED CT'S/ENTE
LR ARCH/RPLC JUMPERS/ENTE
LR WEST/RPLC B3314/ENTE
LR WEST/RPLC CAP & PIN/ENTE
LR WEST/RPLC INSULATORS/ENTE
LYNCH/PULL DC CABLE/ENTE
MABELVALE/2018 ELECTRICAL WORK/ENTE
MAGNOLIA STEEL/INSTALL LACING RPLC
INSULATORS & ARRESTORS/ENTE
MALVERN/ISOLATE SWGR/ENTE
MALVERN/MAINTENANCE SWITCH/ENTE
MANCHESTER/YARD EXPANSION/ENTE
MARKED TREE/ADJUST BLADES/ENTE
MARKED TREE/MOBILE/ENTE
MAYHAMONETTE JUNCTION/DEMO/ENTE
MT PLEASANT/SWITCH ADJUSTMENT/ENTE
MULTIPLE SITES/GENERATOR
MAINTENANCE/ENTE
NEWARK/MOBILE/ENTE
W, TX/MOBILE CREW/ENTE
MCNEIL/TRANSFORMER BANK/ENTE
NEWARK/RPLC SW B3257/ENTE
NEWARK/SUBSTATION/ENTE
NEWPORT INDUSTRIAL/INSULATORS/ENTE
NEWPORT/MOBILE/ENTE
NEWPORT/RPLC CONTROL PANEL/ENTE
NLR DIXIE/RELAY/ENTE
NLR WESTGATE/RPLC FAILED SWITCH/ENTE
PB PORT/RPLC FAILED EQUIPMENT/ENTE
PORT/MOVE MATERIAL/ENTE
POWERLINE/HARDENING/ENTE
ROHWER/OUTAGE/ENTE
RUSSELLVILLE EAST/INSTALL CONDUIT & PULL
CABLE/ENTE
SAGE/MOBILE WORK/ENTE
SHERIDAN EHV/PROCURE & INSTALL
GENERATOR/ENTE
STUTTGART RICUSKEY/TRAP/ENTE
STUTTGART/TLW989/ENTE
STUTTGART/TSW031/ENTE
STUTTGART/TSW042/ENTE
SYLVAN HILLS/RPLC SWITCH B2812/ENTE
WALNUT RIDGE/INSULATOR FAILURE/ENTE
WOODWARD/CABLE PULL/ENTE
WOODWARD/RPLC TRANSFORMERS/ENTE
ENTERGY MAINTENANCE SCOPE:
KECI performs maintenance on Entergy’s grid
performing all aspects of construction on
equipment from 15kV to 500kV. Maintenance
jobs include but not limited to 115kV‐500kV
breaker replacements, 69kV – 500kV switch
and MOD replacements, animal mitigation
installation, control panel change outs,
arrestor replacements, mobile equipment
installation and removal. The scope of work
are either planned maintenance or
emergency failed work.
CONTACT INFORMATION:
Entergy of Arkansas
Mike Pate
T 501.490.4771
2017 TOTAL TO DATE:
$4,684,009
JOB LOCATION / DESCRIPTION:
AECC/AMERICAN GOVERNOR COMPANY
ANO/ADSS/ENTE
ANO/B0125/ENTE
ANO/B8351/ENTE
ANO/LIGHTING ARRESTORS/ENTE
ANO/MABELVALE ELECTRICAL UPGRADE/ENTE
ANO/PREWORK B0125 & B0126/ENTE
ANO/RPLC INTERRRUPTERS/ENTE
ANO/RPLC PT'S/ENTE
ANO/SPOF AUTO/ENTE
ANO/SPOF UNIT 2/ENTE
ANO/SPOF‐UNIT 1/ENTE
ARKADELPHIA NORTH/RPLC SWITCHES/ENTE
BATESVILLE/B06372/ENTE
BATESVILLE/RPLC SWITCHES C&P INSULATORS
BAUCUM/FAILED FEED BREAKER/ENTE
BAUCUM/METERING CTS&PTS/ENTE
BAUCUM/MOBILE/ENTE
BEARDEN/RPLC FAILED REGULATOR/ENTE
BEAUMONT, TX/MOBILE CREW/ENTE
BLYTHEVILLE I55 N/CIRCUIT SWITCHER REPAIR
BONO/ELECTRICAL&RELAY/ENTE
BONO/NEW SUBSTATION/ENTE
CAMDEN MCGUIRE/BUS RECONFIGURATION
CAMDEN McGUIRE/MOBILE
CAMDEN McGUIRE/RPLC BREAKER
CAMDEN NORTH/CIRCUIT SWITCHERS
CEDAR GROVE/MOBILE/ENTE
CONWAY WEST/ASSIST CT RPLC/ENTE
CORNING/BREAKERS/ENTE
CORNING/AC POWER TO CONTROL HOUSE
CORNING‐DATTO/ELECTRICAL/ENTE
CROSSETT WEST/RPLC FAILED BREAKER/ENTE
DANVILLE/SWITCH FAILURE B2530/ENTE
DRIVER/HARDENING/ENTE
DRIVER/PULL CABLE/ENTE
DRIVER/RPLC FAILED REACTOR/ENTE
EL DORADO LION/MOBILE/ENTE
EL DORADO LION/RPLC 2 SWS/ENTE
El DORADO PARNELL/MOBILE/ENTE
FLIPPIN/TELECOM/ENTE
FORREST CITY/TOWER LIGHTS/ENTE
GAINSVILLE/SWAP/ENTE
JOB LOCATION / DESCRIPTION:
W MEMPHIS EHV/RPLC REACTR/ENTEMABELVALE/SUBST HARDENING/ENTEMAGNET COVE EHV/HARDENING/ENTEHOT SPRINGS EHV/HARDENING/ENTESHERIDAN EHV/HARDENING/ENTEWHITE BLUFF EHV/SUB HARD/ENTEKEO/SUBSTATION HARDENING/ENTEHOLLAND BOTTOMS/SUBS HARD/ENTEWRIGHTSVILLE/SUBST HARDEN/ENTEETTA/SUBSTATION HARDENING/ENTEEL DORADO/SUBSTATION HARD/ENTEDELL/SUBSTATION HARDENING/ENTEINDEPENDENCE/SUBST HARDEN/ENTEMAYFLOWER/SUBST HARDEN/ENTESAN SOUCI/SUBST HARDEN/ENTEPLEASANT HILL/SUBST HARD/ENTEWOODWARD/SUBST HARDEN/ENTEMCNEIL/SUBSTATION HARDEN/ENTEWEST MEMPHIS/SUSBT HARDEN/ENTENLRMCLMT/RPLC B0980 CRCSW/ENTEHENSLEY/RPLC TLINE SWITCH/ENTEPARAGLD/REMOV 35KV EQPMNT/ENTEWHITE BLUFF/FIBER/ENTELEWISVILLE/CIRCT SW B0973/ENTELR GNES & GRLND/HNG GRNDS/ENTEMABELVALE/BUS REPAIR/ENTEJACKSONVILLE SOUTH/REMOB/ENTEW MEMPHIS EHV/SWTCH WORK/ENTECOFER/34.5KV SWITCH/ENTEMONTICELLO EAST/MOBILE/ENTELR KANIS/LINE TRAP/ENTELR PINNACLE/LINE TRAP/ENTEBRINKLEY E/2016 WORK PLAN/ENTESTUTGRT RCSKY/LINE OUTAGE/ENTEWEST HELENA/LINE OUTAGE/ENTEANO/B5102 BREAKER/ENTEANO/B5122 BREAKER/ENTE23RD & SPRING/FIBER PULL/ENTEMCCLELLAN/FIBER PULL/ENTESTTGRT RCSKY/T#2 HANG GRD/ENTEANO/FIBER/ENTENEWPORT IND/EMRGNCY MOBL/ENTELRPORT/RPLC FLD 15KV BRKR/ENTEELDORADOUPLND/TELECOM MSK/ENTEGIFFORD/TELECOM MAST/ENTELEWISVILLE/R1/ENTEWHITE BLUFF/UNLOAD BRK/ENTEJCKSNVL S/RPLC CRCT SW G/ENTEPOCAHNTS S/RPLC OCB FDR/ENTEATKINS/RPLC CRC SWG B0410/ENTEMGNLASTL/1LINE SECT B0881/ENTEARKDLPHA N/RPLC CIR B0116/ENTEMAGNLIA STL/ONLN SCTB0644/ENTE
2 0 1 6 E N T E R G Y M A I N T E N AN C E J O B L I S T
WHITE BLUFF 230KV/WIREWAY/ENTEWHTE BLFF/RPLC 500KVINSLR/ENTECLARENDN/RPLC FEEDER W160/ENTECLARENDN/RPLC FEEDER F160/ENTEMONETTE JCT/RPLC CIRC SWT/ENTEHAMBURG/RPLC REGULATOR/ENTEDERMOTT/SWITCH/ENTETX E MALVRN/RPLC SW B4724/ENTESEARCY S/RPLC FAILD B0525/ENTEGALLOWAY/RPLC SW B4892/ENTEDIAMOND CITY/MOBILE/ENTEMONETTE JCT/MOBILE/ENTEPARKIN/MOBILE/ENTEROHWER/MOBILE/ENTEPOCAHONTAS S/ARSTRS & INS/ENTEPOCAHONTAS SOUTH/BREAKERS/ENTEANO/REMOVE SW & BREAKER/ENTEWHT BLUFF/RPLC CCVT B3356/ENTEELDRO NWL/RPLC CIRC SWTR/ENTECRPNTRDAM/RMV HSEHV LNTRP/ENTEHS EHV/ RELAY WORK/ENTEWHITE BLF/AVIATION LIGHTS/ENTEW MEMPHS EHV/RMV DLGE SYS/ENTECORNING/SHIELDING MAST/ENTEPARKIN/RPLC CIRC SW/ENTEHSEHV/RPLC LN TRP & TUNRS/ENTEHARRISON EAST/RELAY WORK/ENTEWHTEBLFF/500 RPLC SWB7902/ENTESHERIDAN/500RPLC SW B5023/ENTEHENSLEY/RPLC SWITCHES/ENTEMULTI SITE/FIBER TERM/AECCSTRONG/RPLC REGULATOR/ENTEDRIVER/SUBST HARDEN/ENTEWHITE BLUFF/SET CTS/ENTECLARENDON/MOBILE&B7645/ENTEMONETTE JCT/RELAY/ENTEWEST MEM GTWY/RPLC REGLTR/ENTEMONETTE JCT/RELAY T1/ENTEMARVELL/BREAKR & REGULATR/ENTELR ALXNDR/T3 THRWOVR SWTH/ENTEHS EHV/CCVT/ENTEREED/SWITCHES/ENTEHARRISON E/RPLC LINE TRAP/ENTEBAUCUM/MOBILE/ENTEHARRISON E/CIRCUIT SW/ENTECASH/MOBIL/ENTEBRINKLEY EAST/B8076/ENTEMARION/MOBILE & B2629/ENTE
LR ALEXANDER/JUMPERS T2/ENTEWHITE BLUFF/LAYDOWN AREA/ENTECORNING/SHIELDING MAST/ENTEPANEL/PICKUP&DELIVERY/ENTEWST HELENA/RPLC 3 CCVTS/ENTEBAUCUM/MOBILE FOR TESTING/ENTENEWPORT/CONSTRUCTION/ENTE
ENTERGY MAINTENANCE SCOPE:
KECI performs maintenance on
Entergy’s grid performing all aspects of
construction on equipment from 15kV
to 500kV. Maintenance jobs include but
not limited to 115kV‐500kV breaker
replacements, 69kV – 500kV switch and
MOD replacements, animal mitigation
installation, control panel change outs,
arrestor replacements, mobile
equipment installation and
removal. The scope of work are either
planned maintenance or emergency
failed work.
CONTACT INFORMATION:
Entergy of Arkansas
Mike Pate
T 501.490.4771
2016 TOTAL TO DATE:
$3,910,582.75
Koontz Electric Company, Inc. welcomes an opportunity to make your next project a success. We
maintain a professional and technical staff to support our expert field team of technicians and
craftsman. Please contact any one of the Koontz Management team listed below for more information.
Name Title Cell Phone Email
Benny Koontz President / CEO (501) 977-6086 [email protected]
Dean Hoover Executive Vice President / COO (501) 977-6063 [email protected]
W. Mark Day Executive Vice President / CFO (501) 977-6528 [email protected]
Bryce Koontz Vice President - Business Development (501 289-0965 [email protected]
Jeff Ludwig Vice President - Project Management (501) 977-6098 [email protected]
Jamie Zimmerman Project Engineer (501) 977-6538 [email protected]
Paul Zimmerman Project Engineer (501) 977-6545 [email protected]