substation & switchyard project references - Koontz Electric

66
OUR POWER IS IN OUR PEOPLE SUBSTATION & SWITCHYARD PROJECT REFERENCES ************************************************************************************************ ************************************************************************************************

Transcript of substation & switchyard project references - Koontz Electric

OUR POWER IS IN OUR PEOPLE

SUBSTATION & SWITCHYARD PROJECT REFERENCES************************************************************************************************

************************************************************************************************

Koontz Electric Company, Inc., (KECI), welcomes an opportunity to make your next

project a success. We maintain a professional and technical staff to support our

experienced field craftsman. We pledge to safely deliver a quality finished product in

a timely manner, and at a competitive cost.

KECI is a diversified heavy industrial electrical contractor. We perform a wide array of

contracts specifically chosen for technical and installation complexities. KECI’s team

supports the total spectrum of power, control, and instrumentation system needs. We

have proudly served Arkansas and the nation for over 60 years. In just the last ten

years we have completed over 300 projects in dollar volume exceeding $300 million.

We have never failed to complete a project.

Numerous repeat customers, universal customer satisfaction, and our strong industry

reputation, is positive feedback that our approach delivers. A fervent commitment to

safety, quality, timely schedules, and cost control, are the keys to our success and

longevity. Our professional office and field staff, diverse work history and over five

decades of experience, uniquely qualify us for the most challenging projects

Koontz Electric Company, Inc. 1223 East Broadway Morrilton, Arkansas 72110 (501) 354-2526 http://www.koontzelectric.com

I N T RODUC T I ON

10626718 / 10621005-001

20-2416 2

JOB LOCATION:

Newport AB Substation758 Hwy 18 ENewport, AR 72112

POC: Justin Hart

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]

START / COMPLETION DATE

9/14/2020 - 3/5/2021

FINAL CONTRACT AMOUNT

$549,945.00

SCOPE OF WORK:

Scope of work for T-1 modifications consisted of removing the

breaker, installing PT, line trap and breaker.

Scope of work for T-2 modifications consisted of furnishing and

installing control house cable tray, installation of all substation

steel, all electrical equipment and all above grade conduit. Pulled

control cable, meggar new cables, installed junction boxes and

terminated new cable. Set all panels in the control house, installed

and removed temp carpet in control house and built and installed

print table. Also included installed all animal mitigation as needed.

SCOPE OF WORK:

NEWPORT AB SUBSTATION T-1 & T-2 MODIFICATIONS

January 4, 2021 / September 14, 20

Entergy Arkansas, LLC5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

EP29586

20-2086

JOB LOCATION:

Plum Point Energy Station2732 S. County Road 623Osceola, AR 72370

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Stephen [email protected]

START / COMPLETION DATE

4/12/2021 - 4/25/2021

FINAL CONTRACT AMOUNT

$176,235.00

SCOPE OF WORK:

Scope of work consisted of motor control center replacement at

Plum Point Energy Station during April Shutdown.

SCOPE OF WORK:

PLUM POINT ENERGY STATION MOTOR CONTROL REPLACEMENT

December 14, 2020

Plum Point Energy Associates2732 S. County Road 623Osceola, AR 72370

CONTRACT NO / AWARD DATE:

OWNER:

4500966114

20-2252

JOB LOCATION:

Mathewson SubstationE890th Street & N2920 RoadPiedmont, OK 73078

POC: Val Smith405.553.8456

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Adam [email protected]

START / COMPLETION DATE

6/2/2020 - 8/30/2020

FINAL CONTRACT AMOUNT

$393,393.00

SCOPE OF WORK:

Scope of work consisted of the installation of line terminal,

buswork, control cable, switches, breakers, arrestors, metering

CTs, fault recorder rack and line rack. Also included structural

physical installation, steel erection, equipment, dirtwork,

foundations, and testing.

This project was completed on time and under budget.

SCOPE OF WORK:

MATHEWSON SUBSTATION / SUBSTATION WORK

June 6, 2020

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

45000968521

20-2253

JOB LOCATION:

Badger SubstationCounty Rd 1360Elmwood, OK

POC: Val Smith405.553.8456

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]

START / COMPLETION DATE

7/8/2020 - 11/30/2020

FINAL CONTRACT AMOUNT

$573,980.00

SCOPE OF WORK:

Scope of work consisted of Installing new 345kV bay and terminal

for new Nexterra Ponderosa Wind Line. Moved the Bluestem

Wind Line to new bay and performed all substation and SPC

SCOPE OF WORK:

BADGER SUBSTATION

July 1, 2020

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

2020.000748

20-2251

JOB LOCATION:

Pintail SubstationNorth side of US 64Garber, OK 73738

POC: Val Smith405.553.8456

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Ben [email protected]

START / COMPLETION DATE

5/27/2020 - 11/20/2020

FINAL CONTRACT AMOUNT

$2,446,321.00

SCOPE OF WORK:

Scope of work consisted of building a new 345kV yard to include,

but not limited to 345kV switches, 345kV breakers, all steel

support structures, and fabricate all aluminum bus and install. Also

included all below and above grade grounding, all above grade

conduit, pull and terminate all associated control cable, build out

the inside of the control house, build and install the relay panels

and all testing and commissioning.

SCOPE OF WORK:

PINTAIL 345kV SUBSTATION

May 21, 2020

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

10608369

20-2902

JOB LOCATION:

Stowell SubstationSR 65Stowell, AR 77514

POC: Cody Collins

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: James [email protected]

START / COMPLETION DATE

4/6/2020 - 8/22/2020

FINAL CONTRACT AMOUNT

$995,780.00

SCOPE OF WORK:

Scope of work consisted of Foundation, Electrical and Relay work.

Replaced transformer T2, installed 69kV circuit switcher, installed

firewall, installed oil containment around transformer T2 and

transformer T1, replaced low side MOS switch, replaced high side

switch with a set of 69kV PTs and removed old PTs and high fuses.

Also included replacing high side switch with a set of 69kV PT's and

removed old PT's and high side fuses.

SCOPE OF WORK:

STOWELL SUBSTATION FOUNDATION, ELECTRICAL & RELAY

April 14, 2020

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10603479

20-2503

JOB LOCATION:

Greyhawk Substation3606 South Rockwood RoadCabot, AR 72023

Justin Hart

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Superintendent: Joey [email protected]: Cory [email protected]

START / COMPLETION DATE

3/1/2020 - 7/19/2020

FINAL CONTRACT AMOUNT

$429,170.00

SCOPE OF WORK:

Scope of work consisted of the installation of electrical equipment, supports, bus and other

components:

· 161kV single phase bus supports (high)

· 161kV single phase bus supports (low)

· 161kV low switch supports

· 161kV high switch support

· H-frame dead end structures

· 13.8kV 50KVA station service with safety switch

· 161kV, 2000A vertical-break switches with associated operating mechanisms

· 161kV, 2000A vertical-break switch with ground switch and associated LLS-II attachment

· 161kV, 2000A vertical-break switch with ground switch and HWS attachment

· 161kV transformer dead end structure

· yard lights

· porcelain post insulators for bus supports

· 161kV circuit switcher

· suspension insulator supports on line dead-end structures and transformer dead end structure

· 15kV breakers

· porcelain insulators on 161kV switches

· 4” schedule 40 aluminum bus with connectors and fitting

· 7 #7 alumoweld shield wire with associated connectors and fittings

· Install 954 ACSR damper cable and jumpers with connectors and fittings

· Install 1272 ACSR jumpers with connectors and fittings

· Install 34.5kV equipment, switches, insulators, bus supports and rigid bus

· Install 34.5kV main breaker, tie breaker, and feeder bay structures

· Install all wire/cable as shown on drawing CB1; includes pulling, stripping, megger testing, and

installation of Burndy YAEV lugs

· Install control house relay panels per drawing LO5, including:

· stand along AC panel

· standalone DC panel

· RTU panel

· RTU Peripheral panel

· MOS panel

· transformer differential panel.

· Install 120/240V AC Automatic transfer switch in control house

· Install battery charger and battery DC switch in control house

· Install ADSS for Telecom (estimated 600 ft.)

· Provide and install above ground conduits

· Install distribution backup pad equipment

· Install Transformer Sump Pump and conduit

This project was completed on time and under budget.

SCOPE OF WORK:GREYHAWK SUBSTATION STEEL & ELECTRICAL

February 24, 2020

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

POC:

10600960

20-2500

JOB LOCATION:

Russellville East Substation3054 East Main StreetRussellville, AR 72802

Justin Hart

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Ben [email protected]

START / COMPLETION DATE

2/1/2020 - 5/31/2020

FINAL CONTRACT AMOUNT

$298,892.00

SCOPE OF WORK:

Scope of work consisted of installation of electrical equipment including breakers, reactors, disconnect

switches, arrestors, lightning masts, aluminum bus and conductor, light fixtures, and support structures.

New Russellville East Reactor Yard:

· 3000 amp 161kV 63kA gas circuit breaker (B1235)

· single phase 3000 amp 161kV 10 Ohm air-core reactors

· 3000 amp 161kV vertical break MOS disconnect switches

· 3000 amp 161kV vertical break disconnect switches

· 161kV tubular low switch support structures

· porcelain post equipment insulators (18 for switches, 24 for reactor supports)

· 4” Sch. 40 aluminum tubing and fittings

· 954 ACSR (Rail) for bundled jumpers

· 954 ACSR (Rail) for bus damping

· H-Frame dead-end structure with bus support beam

· H-frame dead end structure with high bus support beam and 10’ shield masts

· 161kV single phase tubular low bus support structures

· 161kV single phase tubular high bus support structures

· 161kV porcelain post bus support insulators

· 161kV suspension insulators

· 98kV, 115MCOV station class arresters

· 161kV single phase tubular arrester equipment supports structures

· 954 ACSR (Cardinal) for bundled risers

· 75’ static masts

· Provide and install above ground conduit, including flex conduit

· Install above-ground 19#9 copper weld ground pigtails to ground equipment.

Existing Russellville East substation yard:

· 3000-amp 161kV 63kA gas circuit breaker (B1225), including:

o Removal of existing breaker and trap per A3261DD1 through DD4.

o Modification of B1225 foundation (see A3261F08 and A3261SD5)

· new 954 ACSR risers

· Provide and install above ground conduit, including flex conduit

· Install above-ground 19#9 copper weld ground pigtails to ground equipment

This project was completed on time and under budget.

SCOPE OF WORK:RUSSELLVILLE EAST 161KV SUBSTATION REACTORS

January 27, 2020

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

POC:

10600781

20-2501

JOB LOCATION:

Willow Glen Substation2605 Hwy 75St. Gabriel, LA 70776

POC: Monica Tillman

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Michael W [email protected]

START / COMPLETION DATE

1/27/2020 - 9/25/2020

FINAL CONTRACT AMOUNT

$874,051.00

SCOPE OF WORK:

Scope of work consisted of complete decommission and

demolition of generating units 1, 2, 3, 4, and 5.

SCOPE OF WORK:

WILLOW GLEN SUBSTATION DECOMMISSION

January 21, 2020

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

4500950357

20-2250

JOB LOCATION:

Little Sprada Creek Substation2412 Hwy 352Clarksville, AR 72830

POC: Doug Dauman405.553.4871

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Matthew Cotner

START / COMPLETION DATE

1/27/2020 - 4/17/2020

FINAL CONTRACT AMOUNT

$248,328.00

SCOPE OF WORK:

Scope of work consisted of installing two sets of 34.5kV hook

operated switches. Install a set of 69kV CTs and arrestors. Install

two 69kV FIS (Fault Interrupter Switch). Install a new relay panel

with new SEL relays and all associated wiring for panel and all

devices.

SCOPE OF WORK:

LITTLE SPRADA CREEK SUBSTATION

January 7, 2020

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

10599041

19-2509

JOB LOCATION:

Splendora Substation15455 Tram RoadSplendora, Texas 77372

POC: Cody Collins

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Marshal [email protected]

START / COMPLETION DATE

1/1/2020 - 8/30/2020

FINAL CONTRACT AMOUNT

$1,824,836.00

SCOPE OF WORK:

Scope of work consisted of relocating gate, replace 138/13.8kV

transformer T1, replace transformer T1 low side feeder and feeder

bay with main breaker, three feeder breakers and bus tie switch.

Replace transformer T2 low side feeder breakers and feeder bays.

Replace with one main breaker and two feeder breakers. Demo all

existing breakers, breaker foundations, bus foundations, existing

switches and still associated the low side of transformer T1 and

T2. Install firewall, cable trench, run conduit from new equipment

to cable trench and to control house. Relocate gates, extend

grounding gird and install drainage.

This project was completed on time and under budget.

SCOPE OF WORK:SPLENDORA SUBSTATION

REPLACE TRANSFORMERS & INSTALL FIREWALL

January 1, 2020

Entergy Texas, LLC1050 I-10 NorthBeaumont, Texas 77702

CONTRACT NO / AWARD DATE:

OWNER:

10586723

19-2506

JOB LOCATION:

Independence Substation (ISES)555 Point Ferry RdNewark, AR 72562

POC: Jonathan Kooiman

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]

START / COMPLETION DATE

11/4/2019 - 9/30/2020

FINAL CONTRACT AMOUNT

$777,390.00

SCOPE OF WORK:

Scope of work for phase III auto transformers project included:

* Replace existing AT1, 400MVA transformer with new 800MVA

transformer. 

* Pull and terminate new cabling

* Install new bus connections

* Install new metering

* Assist in testing and commissioning.

SCOPE OF WORK:

INDEPENDENCE EHV SUBSTATION AUTO TRANSFORMER PHASE III

September 2019

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10583217

19-2505

JOB LOCATION:

Hearne SubstationHWY 79 – Old Mumford RoadHearne, Texas 77859

POC: Marion R. Greene409.347.5027

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Gus [email protected]: Marshal [email protected]

START / COMPLETION DATE

6/24/2019 - 12/21/2019

FINAL CONTRACT AMOUNT

$1,011,544.00

SCOPE OF WORK:

The overall scope of work was to relocate gate, replace

69/13.8kV XFMR T1 with 69/34.5kV XFMR, remove (2) 13.8kV

feeder breakers and install (1) 34.5kV feeder breaker, install (1)

circuit switcher, and demolish existing feeder bays and

foundations.

SCOPE OF WORK:

HEARNE SUBSTATION TRANSFORMER BAY ADDITION

June 2019

Entergy of Texas1050 Interstate 10 NorthBeaumont, TX 77702

CONTRACT NO / AWARD DATE:

OWNER:

10570016

19-2501

JOB LOCATION:

West Helena Substation112 Kesl LaneWest Helena, AR 72390

Justin Hart501.490.4765

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Michael W. [email protected]

START / COMPLETION DATE

1/21/2019 - 8/30/2019

FINAL CONTRACT AMOUNT

$445,997.00

SCOPE OF WORK:

Scope of work consisted of but not limited to the following:

1. Mobilization and inspection of existing yard.

2. All material inventory for the project.

3. All documentation (SWMS)

4. Weekly COSS safety site visits.

5. Removal of structures and identified equipment

6. Install 115kV breakers

7. Install 115kV equipment pedestals including CCVTs, line traps, surge arresters, and

SSVT equipment

8. Install 115kV single phase low & high bus supports

9. Install 115kV H-Frame deadends

10. Install 115kV low & high bus switches & circuit switchers

11. Install dual yard lights

12. Install 13.8kV station service transformer

13. Install lightning

14. Install meter structure and

15. Removal of gas from demoed

16. Install all connectors, terminals, fittings, jumpers, etc

17. Perform Post-Construction Inventory

18. Provide As-Built Drawings prior to demobilization

19. Demobilization

SCOPE OF WORK:WEST HELENA SUBSTATION ELECTRICAL UPGRADE

January 2019

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

POC:

10562859

19-2500

JOB LOCATION:

Moses SubstationHwy 70Forest City, AR 72335

Matt Bowen

GENERAL CONTRACTOR:

PCS2000, LLC11224 Boardwalk DriveBaton Rouge, LA 70816POC: CE Smith

START / COMPLETION DATE

3/1/2019 - 4/30/2019

FINAL CONTRACT AMOUNT

$678,737.00

SCOPE OF WORK:

Scope of work consisted of but not limited to the following:

1. Installation of 161kV steel structures

2. Installation of 161kV equipment and buswork

3. Installation of all above ground conduit

4. Connect ground ‘pigtails’ to steel structures and equipment

Relay & Checkout scope of work consisted of:

1. Mobilization and inspection of existing yard.

2. All documentation (SWMS)

3. Weekly COSS safety site visits.

4. Cable pull at all sites.

5. All demolished cable to be abandoned in place.

6. Terminating all new control house and field cables including

the lugs according to the cable pull list provided by Entergy.

7. Removal and installation of panels at the remote end sites.

8. Installation of new and relocated junction boxes.

9. Meggaring all cables.

10. Offloading and inventorying all materials.

11. Procurement, installation, and removal of carpet in the new

control house.

12. Procurement and installation of cover up on all existing

panels during demolition and removal at remote end sites.

SCOPE OF WORK:

MOSES SUBSTATION ELECTRICAL & RELAY

January 2019

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

SUBCONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Robert [email protected]

POC:

10537392-00032

19-2466

JOB LOCATION:

Jacksonville North Substation2001 Marshall RdJacksonville, AR 72076

POC: Justin Hart501.490.4765

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]

START / COMPLETION DATE

9/11/2018 - 1/31/2019

FINAL CONTRACT AMOUNT

$1,365,350.00

SCOPE OF WORK:

Scope of work consisted of but not limited to the following

• Replace five LV switches

• Replace two HV switches

• Demo circuit switcher and OCB and replace with two circuit

switchers

• Replace two OCB, replace with VCB breakers

• Install new HV bus tie switch

• Replace six relay panels

• Install new RTU Panel

• Pull all associated cable, perform terminations, and

test/checkout all equipment and relays

• Perform other miscellaneous maintenance activities (jumper

upgrades, pin and cap replacements)

SCOPE OF WORK:

JACKSONVILLE NORTH SUBSTATION ELECTRICAL & RELAY

September 2019

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10589074

19-2459

JOB LOCATION:

El Dorado EHV Substation299 Union 320El Dorado, AR 71730

POC: Jonathan Kooiman

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]

START / ESTIMATED COMPLETION DATE

10/1/2019 - 2/28/2021

CONTRACT AMOUNT

$3,666,777.00

SCOPE OF WORK:

Scope of work consists of but not limited to the following:

1. Mobilization and inspection of existing yard.

2. All material inventory for the project.

3. All documentation (SWMS)

4. Weekly COSS safety site visits.

5. Demo of existing equipment shown on drawings.

6. Installation of new equipment and steel shown on drawings.

7. Installation of new bus and fittings shown on drawings.

8. Above grade conduit and grounding.

9. Transportation of 3 transformers from Mabelvale to El

Dorado.

10. Offloading, setting, assembling, and testing transformers at

site.

11. Replacement of breaker B5820.

12. All onsite workers to be CIP approved

SCOPE OF WORK:EL DORADO EHV TRANSFORMER BANK #3

August 2019

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10586611

19-2455

JOB LOCATION:

Bellaire Substation2227 Hwy 65 NorthLake Village, AR 71653

POC: Austin Thompson

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Cory [email protected]

START / COMPLETION DATE

8/12/2019 - 3/1/2020

FINAL CONTRACT AMOUNT

$453,688.00

SCOPE OF WORK:

Scope of work consisted of installation of electrical equipment

including breakers, disconnect switches, CVT’s, line traps, an

SSVT, arrestors, a lightning mast, aluminum bus and conductor,

light fixtures, and support structures. Ductor all bolted

connections in current-carry junctions. Provided test equipment

and test reports.

SCOPE OF WORK:

BELLAIRE SUBSTATION GREEN FIELD DISTRIBUTION

October 15, 2019

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10589074

19-2454

JOB LOCATION:

El Dorado EHV Substation299 Union 320El Dorado, AR 71730

POC: Jonathan Kooiman

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]

START / ESTIMATED COMPLETION DATE

8/19/2019 - 2/22/2021

CONTRACT AMOUNT

$1,498,704.00

SCOPE OF WORK:

Scope of work consist of installation control cable, panels and

control house modifications and above grade conduit and

grounding. It also consist of outage assistance (grounding,

coordination, etc) and McNeil Remote End cable and panel

installation.

SCOPE OF WORK:

EL DORADO EHV SUBSTATION SPOF

August 2019

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

192255

19-2255

JOB LOCATION:

Ranch Road Substation1491 North W. StreetPonca City, OK 74601

POC: Tim [email protected]

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Adam [email protected]

START / COMPLETION DATE

1/27/2020 - 5/10/2020

FINAL CONTRACT AMOUNT

$399,933.00

SCOPE OF WORK:

Scope of work consisted of installing 345kV line terminal to

Frontier Wind II & III. Install 345kV breaker (PCB 381). Install four

3000A breaker disconnect switches. Install one 3000A line

disconnect with a grounding switch.

SCOPE OF WORK:RANCH ROAD SUBSTATION

December 26, 2019

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

4500924574

19-2253

JOB LOCATION:

Maple Road Substation18875 W. Hwy 270Calumet, OK 73014

POC: Jim Page

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]

START / COMPLETION DATE

4/1/2019 - 11/17/2019

FINAL CONTRACT AMOUNT

$600,190.00

SCOPE OF WORK:

The scope of work consisted of constructing a 138-12.5kV

substation including all substaiton structures, for a single bay

configuration, one dead end structure, bus and switch supports.

Also one 12.5kV cap bank, breaker, one cap bank, various

cabinets and switches, various potential transformers,

grounding grid, meggered control cables. Install all interior

control house cabinets, wiring, racks, wireway and relaying.

SCOPE OF WORK:

MAPLE ROAD SUBSTATION 138kV-12.5kV SUBSTATION

3/20/2019

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

4500924744

19-2252

JOB LOCATION:

Moonshine Substation14333 S. 4460 RoadVian, Oklahoma 74962

POC: Jim Page405.553.5919

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: James [email protected]

START / COMPLETION DATE

5/20/2019 - 9/30/2019

FINAL CONTRACT AMOUNT

$699,900.00

SCOPE OF WORK:

Scope of work included:

* Build out 161kV bus to include, three 69kV breakers, three

new dead end structures.

* Install any motor operators and adjust.

* Install various potential transformers.

* All breaker jumper and control wiring and terminations.

* All Control House internals.

* Install all substation grid conductors.

* Install all control cables.

* Megger all outdoor control cables.

* Terminate and lip all relaying cables.

* Spreading of OG&E supplied gravel to 4 inches coverage over

entire substation.

* Installing 4 OG&E supplied oil filters inside drain boxes

SCOPE OF WORK:

MOONSHINE ROAD SUBSTATION

March 21, 2019

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

4500924268

19-2251

JOB LOCATION:

Three Rivers SubstationMuskogee, OK

POC: Keith Stockton405.553.8599

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: James [email protected]

START / COMPLETION DATE

2/1/2019 - 4/30/2019

FINAL CONTRACT AMOUNT

$201,952.00

SCOPE OF WORK:

Scope of work consisted of installation of undergrund control cable,

ground grid and welding of overhead bus.

SCOPE OF WORK:

THREE RIVERS SUBSTATION UNDERGROUND CABLE

3/18/2019

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

18061-02

19-2202

JOB LOCATION:Bryan Substation6845 Rabbit LaneBryan, Texas 77808Braxos County

Paul Chamoun

GENERAL CONTRACTOR:Ampirical Solutions4 Sanctuary Blvd., Suite 100Mandeville, LA 70471Program Manager: Scott Curry985.231-6910

START / COMPLETION DATE

7/9/2019 - 10/26/2020

SCOPE OF WORK:

Scope of work consisted of the installation of all substation

steel, GIS Bus, GIS Breakers, GIS Voltage Transformers, GIS

Switches, and substation lighting for 69kV/138kV switchyards.

Included the installation and termination of all control cables

and local control cabinets. Vacuum and filling of all GIS

equipment, and assist in HI-Pot testing.

 

Installation of station power for (2) control house, including the

installation of all relay and communication panels, and

miscellaneous power panels within the control houses for

lighting, crane hoist power, receptacles, and lighting.

 

Installation of transformer blast wall, above grade grounding,

and above grade conduits.

 

Included installation of various relay panels, substation steel,

substation equipment, substation bus, and control cable for (2)

remote ends.

 

Included the removal of existing substation steel, equipment,

transformers, and control cables.

This project was completed on time and under budget.

SCOPE OF WORK:BRYAN GIS SUBSTATION

138/69KV REPLACE AUTOS & RECONFIG BUSES

December 2018

Entergy Corporation539 Loyola AvenueNew Orleans, AR 70113

CONTRACT NO / AWARD DATE:

OWNER:

SUBCONTRACTOR:Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]: Robert [email protected]

POC:

10096574

18-2520

JOB LOCATION:

Independence Substation (ISES)555 Point Ferry RdNewark, AR 72562

POC: Jonathan Kooiman

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Joey [email protected]

START / COMPLETION DATE

1/1/2019 - 12/31/2019

FINAL CONTRACT AMOUNT

$749,227.00

SCOPE OF WORK:

Scope of work for phase II auto transformers project included:

* Replace existing AT2

* 400MVA transformer with new 800MVA transformer

* Pull and terminate new cabling

* Install new bus connections

* Install new metering and assist in testing and commissioning

This project was completed on time and under budget.

SCOPE OF WORK:

INDEPENDENCE EHV SUBSTATION AUTO TRANSFORMER PHASE II

January 2019

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10558452

18-2515

JOB LOCATION:

Independence Substation (ISES)555 Point Ferry RdNewark, AR 72562

POC: Jonathan Kooiman

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]

START / COMPLETION DATE

9/21/2018 - 12/31/2018

FINAL CONTRACT AMOUNT

$820,665.00

SCOPE OF WORK:

Scope of work consisted of:

· Installation of sub-grade conduits, pullboxes and ground grid for

new substation sites.

· Installation of concrete encasement for road crossings.

· Install cabling, labeling, and terminating as required by

design/cable pull list.

· Demo existing equipment.

· Install new equipment and steel.

· Install new bus and fittings.

· Install control cable as specified on the cable pull list (estimated

72,000’).

· Install panels and control house modifications.

· Install above grade conduit and grounding.

· Install cable tray in control house.

· Remove jumpers on step up transformer for clearance purposes.

· Demo Tline structure and replace with Deadend structure.

· Complete wire work associated new Deadend structure.

SCOPE OF WORK:

INDEPENDENCE SUBSTATION AUTOTRANSFORMER PHASE I

September 2018

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10556677

18-2514

JOB LOCATION:

Mabelvale Substation12303 Vimy Ridge RdMabelvale, AR 72103

Scott McMahan

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]

START / COMPLETION DATE

8/20/2018 - 8/9/2019

FINAL CONTRACT AMOUNT

$4,861,970.00

SCOPE OF WORK:

Scope of work consisted of:

· Replace existing manhole and sump with 6’x8’ precast manhole and sump pump

· Provide and install below grade conduits from existing trench to new transformer

cabinets

· Install new foundation additions for firewalls

· Install (4 ea) foundation pads for Autos to remain staged at Mabelvale

· Orient timber mats for staging the (3 ea) autos being relocated to El Dorado

· Provide and install below grade conduits from existing trench to standby

transformers via junction box

· Demo all foundations around transformers, backfill and compact

· Demo old reactor block walls

· Fabricate steel for foundations and install

· Provide and install rigid/flex conduit and jumpers to connect the auto bushing

terminals to existing

· Install (2 ea) SS XFMRs and replace 3” neutral bus with 4”

· Install (6 ea) Durasystem fire barrier walls to existing wall foundations to structures

· Install all control cable specified for the project

· Run AC cables and control cables in the yard to each cabinet for existing autos from

AC source to new staging location for existing transformers

· Tie new transformers to existing electrical arrangement on high and low sides

· Reconductor from transformer to 115kV bay for AT1 and AT2 banks

· Install 2 SVT, new marshalling cabinets, and wire

· Replace (7 ea) 500/115kV single phase auto units

· Perform necessary equipment benchmark testing before disassembling the autos

· Remove oil in existing autos

· Disassemble all autos

· Jack and pull four autos to new staging pads in Mabelvale

· Assemble (4 ea) autos back and fill oil

· Complete benchmark testing for re-assembled transformers

· Run AC cables and control cables in the yard to each cabinet for existing autos from

AC source for new transformers

· Complete all necessary testing and commissioning of all new equipment

· Install all equipment as shown in the Mabelvale EHV foundation, electrical, and relay

SCOPE OF WORK:MABELVALE EHV AUTOTRANSFORMERS

August 2018

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

POC:

10550130

18-2513

JOB LOCATION:

London North Substation236 May RoadRussellville, AR 72802

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Superintendent: Joey [email protected]: Justin [email protected]

START / COMPLETION DATE

6/1/2018 - 12/31/2018

FINAL CONTRACT AMOUNT

$1,069,054.00

SCOPE OF WORK:

Foundation scope of work consisted of forming, pouring, and finishing of all

structural and equipment foundations. Installation of sub-grade conduits

and ground grid for new substation sites. Existing substation sites were

expanded or improved. Installation of all sub-grade conduit and fiberglass

pull-boxes. Installation of the ground grid, including sub-grade 4/0 copper,

above grade 19#9 copperweld, and ground rods. Installation of CONCAST pre-

fabricated cable trench. Installation of concrete encasement for road

crossings.

Electrical scope of work consisted of compilation of all nameplate data of all

equipment installed. Installation of electrical equipment, including breakers,

battery installation/test and checkout work, disconnect switches, CVT’s, line

traps, an SSVT, arrestors, a lightning mast, aluminum bus and conductor,

light fixtures and support structures. Ductor all bolted connections in

current-carrying junctions and provide test reports. Drainage holes drilled in

rigid bus tubing for weeping.

Relay scope of work consisted of installing cabling, labeling and terminating.

Installed one standard transformer differential panel with main application

according to Entergy Standard PM3505 Opt. B. Installed one station service

AC panel. Installed a main disconnect device between the station service

transformer and station service AC panel. Installed six 70:1 potential

transformers for three phase low voltage bus potentials. Installed two low

voltage potential junction box for three-phase applications. Installed eight

SEL 2810 fiber converters. Installed one indoor standalone split AC/DC panel

with appropriately sized breakers. Installed one substation battery set and

rack, one battery charger, one battery maintenance switch. Installed one

automatic transfer switch for substation service AC between primary and

secondary AC sources. Installed one 24” RTU Communications panel and one

30” peripheral card panel for alarming and control functions. Installed one

24” MOS control panel for control of the two motor operated line switches.

SCOPE OF WORK:

ELECTRICAL, FOUNDATION & RELAY LONDON NORTH SUBSTATION

May 31, 2018

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

POC:

kim.moore
Rectangle

10546103

18-2510

JOB LOCATION:

Mallory Substation2803 Van Dyke RoadNewport, AR 72112

POC: Justin Hart

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Cory [email protected]

START / COMPLETION DATE

5/7/2018 - 6/25/2019

FINAL CONTRACT AMOUNT

$1,578,401.00

SCOPE OF WORK:

The scope of work included but not limited to all underground work

including foundations, grounding and conduit system. The above

grade electrical is also encompassed in the total scope of work and

includes installation of the steel, bus and fittings, above grade

grounding, above grade conduit, and equipment. The relay/testing

and commissioning of the project includes pulling and terminating

all control and power cables, trimming out the control house, and

testing all equipment.

SCOPE OF WORK:

MALLORY GREENFIELD SWITCHYARD

April 24, 2018

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10546928

18-2511

JOB LOCATION:

Pecan Street Substation1411 Daughtry StreetNewport, AR 72112

POC: Justin Hart

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Justin [email protected]

START / COMPLETION DATE

6/12/2018 - 8/21/2019

FINAL CONTRACT AMOUNT

$1,462,276.00

SCOPE OF WORK:

The scope of work included all underground work including

foundations, grounding and conduit systems. The above grade

electrical is also encompassed in the total scope of work and

includes installation of the steel, bus and fittings, above grade

grounding, above grade conduit, and equipment. The relay/testing

and commissioning of the project included pulling and terminating

all control and power cables, trimming out the control house, and

testing all equipment.

SCOPE OF WORK:

PECAN STREET DISTRIBUTION YARD

June 12, 2018

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10541720

18-2508

JOB LOCATION:

Danville Substation600 Hwy 10 WDanville, AR 72833

POC: Bob Wray

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Michael W [email protected]

START / COMPLETION DATE

4/18/2018 - 5/14/2018

FINAL CONTRACT AMOUNT

$413,902.00

SCOPE OF WORK:

Scope of work consisted of electrical, foundation and relay

construction at the Danville 161kV Substation.

SCOPE OF WORK:DANVILLE 161kV SUBSTATION

ELECTRICAL, FOUNDATION & RELAY CONSTRUCTION

April 2016

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

C6PPTSW033

18-2506

JOB LOCATION:

Pleasant Hill Substation424 Solgohachia RoadMorrilton, AR 72110

Justin Hart501.490.4765

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Ben [email protected]

START / COMPLETION DATE

3/26/2018 - 5/31/2018

FINAL CONTRACT AMOUNT

$306,229.00

SCOPE OF WORK:

Scope of work consisted of the instation of electrical and structural

equipment.

• One (1 LOT) disconnect existing PTs from tertiary bus #1 and relocate to

grounding bank "W' structure

• One (1 LOT) connect 6" bus tubing to tertiary bus #1 of the

autotransformers

• One (1 LOT) install 6" bus tubing for tertiary bus #2

• One (1 LOT) install 1272 ACSR damper cables with connectors and fittings

inside 6" bus tubing

• One (1 LOT) install 3" bus tubing for reactor bays

• One (1 LOT) 336 ACSR damper cables with connectors and fittings inside

bus tubing

• Three (3 EA) 34.5kV 3000A vertical-break switch with associated operating

mechanism and associated structures

• Three (3 EA) 3-10MVAR shunt reactors and associated pedestals for each

reactor bay

• Three (3 EA) install 2000A GCB for each reactor bay

• Two (2 EA) install 161 kV CCVT on Band C phase bus with associated

structures in the 161 kV switch yard

• One (1 LOT) attach copperweld ground lead "pigtails" to shield wires,

structural steel, and electrical equipment

• One (1 LOT) install grounding bank, current limiting reactor, and station

seNice and associated "W' structure

• One (1 EA) install lightning mast

• One (1 LOT) install V1 M, V2M, V3M, T1 , T2, S, AND W structures with

associated insulators and jumper cables

SCOPE OF WORK:

PLEASANT HILL SUBSTATION ELECTRICAL

January 2019

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

POC:

10547870-0001

18-2431

JOB LOCATION:

Golden Meadow Substation19547 East MainGolden Meadow, LA 70357

POC: Gary Gauthreaux

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Gus [email protected]: Cory [email protected]

START / COMPLETION DATE

5/1/2018 - 8/1/2018

FINAL CONTRACT AMOUNT

$598,544.00

SCOPE OF WORK:

The scope of work consisted of installation, testing and

commissioning of a new 21 MVAR Capacitor Bank, Capacitor

Protection Panel and new Capacitor Switch Device.

SCOPE OF WORK:

GOLDEN MEADOW SUBSTATION REPLACE CAPACITOR BANK

6/11/2018

Entergy of Louisiana639 Loyola AveNew Orleans, LA 70113

CONTRACT NO / AWARD DATE:

OWNER:

4500915608

18-2250

JOB LOCATION:

Canton Lake Substation1229 Hwy 51Canton, OK 73724

POC: Keith Stockton

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: James [email protected]

START / COMPLETION DATE

1/1/2019 - 1/24/2019

FINAL CONTRACT AMOUNT

$91,215.00

SCOPE OF WORK:

Scope of work included installing all interior grid conductors, all

control cables, terminations and testing.

SCOPE OF WORK:

CANTON LAKE SUBSTATION GROUND GRID & CONTROL CABLE

December 12, 2018

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

10551051

18-2201

JOB LOCATION:

Jefferson Parish SubstationJefferson Parish, LA

POC: Gerald [email protected]

GENERAL CONTRACTOR:

Ampirical Solutions, LLC4 Sanctuary BLVD., Suite 100Mandeville, LA 70471POC: Barry Slater985.809.5526

START / COMPLETION DATE

8/1/2019 - 10/1/2019

FINAL CONTRACT AMOUNT

$425,405.00

SCOPE OF WORK:

Scope of work consisted of the removal of Bays 1 & 2 of the

115kV substation and a new bay added in the same location to

Entergy standards to accommodate connection of the new

generation unit to Michoud 115kV substation. All new relay and

metering panels were installed in the existing control house to

accommodate the station connection and transmission line.

SCOPE OF WORK:

NOPS 115KV INTERCONNECT

September 2018

Entergy of Louisiana639 Loyola AveNew Orleans, LA 70113

CONTRACT NO / AWARD DATE:

OWNER:

SUBCONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]

17102-KOONTZ

18-2200

JOB LOCATION:

Jefferson Parish SubstationJefferson Parish, LA

Mario [email protected]

GENERAL CONTRACTOR:Ampirical Solutions, LLC4 Sanctuary BLVD., Suite 100Mandeville, LA 70471Contact: Barry Slater985.809.5526

START / COMPLETION DATE

6/1/2019 - 7/2/2020

FINAL CONTRACT AMOUNT

$4,389,267.00

SCOPE OF WORK:

Koontz Electric was contracted to perform the electrical portion

of the Jefferson Parish Reliability Improvement Project

upgrading and expanding the electrical power transmission grid

around New Orleans. This contract included work at the

following locations:

* Alliance - Modifications s to 115kV and construction of new

230kV yard

* Barataria - Modifications to 115kV and construction of new

230kV yard

* Churchill - New 230kV Switching Station

* Estelle – Modifications to the existing 230kV yard.

* Ninemile – Modification/Replacement of relay panels in

115kV Control House

* Waterford – Modification/Removal of 230kV equipment and

relay panels. In 230kV control house.

* Westwego –Modification/Removal relay panels in control

house and add new bay for the 2nd Ninemile line.

SCOPE OF WORK:

JEFFERSON PARISH SUBSTATIONS RELIABILITY IMPROVEMENT PROJECT

December 14, 2018

Entergy of Louisiana639 Loyola AveNew Orleans, LA 70113

CONTRACT NO / AWARD DATE:

OWNER:

SUBCONTRACTOR:Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]

POC:

W9128F-18-C-0032

18-2069

JOB LOCATION:

Gavins Point Powerhouse55245 Nebraska HWY 121Crofton, NE 68730

POC: Matthew Hibbert 402-995-2480

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: James Gammill501 [email protected]

START / COMPLETION DATE

8/19/2019 - 10/20/2019

FINAL CONTRACT AMOUNT

$856,658.00

SCOPE OF WORK:

Work at the Gavins Point Powerhouse Switchyard consisted of

upgrading the Transmission Line and Generator Bays by

replacing the eighteen (18) existing 123kV, 2000A group-

operated manually operated disconnect switches, motor

operated disconnect switches, and associated grounding

switches. Also replaced all of the pole top cappin insulators on

the Main Bus and Transfer Bus. Replaced ACSR jumpers and

upleads as necessary to fully upgrade the bays to a 1200A

capacity.

SCOPE OF WORK:

GAVINS POINT DISCONNECT SWITCHES

September 24, 2018

US Army Corps of EngineersOmaha District1616 Capitol AvenueOmaha, Nebraska 68102-4901

CONTRACT NO / AWARD DATE:

OWNER:

W9128F-18-P-0112

18-2068

JOB LOCATION:

Oahe Dam28563 Powerhouse RdPierre, SD 57501

POC: Nadine Catanie

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Stephen [email protected]

START / COMPLETION DATE

8/19/2019 - 1/15/2020

FINAL CONTRACT AMOUNT

$2,810,201.00

SCOPE OF WORK:

The scope of work included replacement of the 13.8kV station

service switchgear. Supply and install a voltage regulator, zig-zag

transformer and resistor, disconnect switches, bus insulators,

panelboards and a dry type transformer. Project required rework

of tublar bus to incorporate new equipment. Civil work included

excavation and installation of new duct bank, new equipment pads

for equipment and containment for the oil filled voltage regulator.

Also integration with the plant, testing, commissioning and

training. This project was completed on time and under budget.

SCOPE OF WORK:

OAHE STATION SERVICE SWITCHGEAR REPLACEMENT

September 20, 2018

USACE - Omaha District1616 Capitol AvenueOmaha, NE 68102-4901

CONTRACT NO / AWARD DATE:

OWNER:

10531947

17-2508

JOB LOCATION:

Manchester SubstationJefferson County, Texas2202 Main AveGroves, TX 77619

POC: Construction Engineer: Martin Luther409.893.5744Operational Coordinator: Luke English409.626.1352

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Jesse Charton

START / COMPLETION DATE

1/1/2018 - 4/11/2018

FINAL CONTRACT AMOUNT

$987,055.00

SCOPE OF WORK:

Scope of work consisted of the installation of new 25MVA

transformer in T1 position.  Removal of feeder bay, breaker and

install new.  Modification to roll phases on high side of T1. 

Removing and installing new foundations, conduit and grounding,

steel, equipment, bus and fittings, cable and testing and

commissioning.

SCOPE OF WORK:

MANCHESTER SUBSTATION YARD EXPANSION

January 2018

Entergy of Texas1050 IH-10 NorthBeaumont, Texas 77702

CONTRACT NO / AWARD DATE:

OWNER:

10516894

17-2500

JOB LOCATION:

Bono Substation432 Hwy 285 N.Damascus, AR 72039

POC: Robert Durham

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Michael [email protected]

START / COMPLETION DATE

6/1/2017 - 11/30/2017

FINAL CONTRACT AMOUNT

$999,754.00

SCOPE OF WORK:

The scope of work included installing two line bays, one

transformer bay with three feeder bays, and a tiebreaker bay for

future expansion provisions. The ultimate installation included a

two-bus arrangement with two line bays with breakers, two

transformer bays, and three feeders per transformer. The

substation cut into the Pleasant Hill to Quitman T-line. Microwave

tower for telecom was installed and ready for RTU. Foundation

work at remote substations was also completed.

SCOPE OF WORK:

BONO SUBSTATION

June 6, 2017

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

172057

17-2057

JOB LOCATION:

OMPA Plant1420 North UnionPonca City, OK 74601

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: James [email protected]

START / COMPLETION DATE

1/1/2018 - 7/31/2018

FINAL CONTRACT AMOUNT

$1,859,756.00

SCOPE OF WORK:

The scope of work consisted of installing a new 69/12.5kV

substation with an owner furnished GSU transformer and 69kV SF6

circuit breaker.  KECI also installed a new transmission line to

connect the plant to the existing utility lines and new control and

medium voltage cables to the new equipment located in the

substation. KECI was responsible for the removal of existing

switchgear within the plant, and installing a new owner furnished

15kV and 480V Switchgear and MCC. KECI was also responsible for

the controls interface between the new equipment and Control

Room via hard wired as well as Modbus TCP/IP.

SCOPE OF WORK:

OMPA PLANT/PONCA GENERATING SYSTEM

September 2018

Oklahoma Municipal Power Association (OMPA)2701 West I-35 Frontage RdEdmond, OK 73013

CONTRACT NO / AWARD DATE:

OWNER:

4500924744

17-2051

JOB LOCATION:

Cimarron Substation14945 W. Hwy 66Yukon, OK 73099

POC: Tim Carter

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: David [email protected]

START / COMPLETION DATE

8/7/2017 - 1/1/2018

FINAL CONTRACT AMOUNT

$226,622.00

SCOPE OF WORK:

Scope of work included:

* Remove (2) 345kV, 1600A, 25,000MVA PCB, CO#2309 and

2310.

* Remove (4) 345kV, 1600A, 3 pole, vertical break switch,

302M1, 302La, 382La, 382L2.

* Remove (1) 345kV, 1600A, 3 pole, group operated, vertical

break switch, with ground switch 334 and 334G.

* Install (2) 345kV, 3000A, 40kA, Mitsubishi type, PCB CO# 6134

and 6133

* Install (4) 345kV, 3000A, 3 pole, double side break switch with

motor operator, 302M1, 302L1, 382L1, 382L2.

* Install (1) 345kV, 3000A, 3 pole, double side break switch,

with grounding switch, manual operated, 334 and 334G.

* Replacing (3) 345kV, Trench type, "TEFV 362" CCVT's

* Replacing (1) 345kV, 120A, 2-freq, line trap (A phase only)

with 345kV, 3000A, 2-freq line trap.

SCOPE OF WORK:

CIMARRON SUBSTATION

August 7, 2017

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

162507

16-2507

JOB LOCATION:

Entergy Coly Substation9085 Florida BlvdWalker, Louisiana 70785

GENERAL CONTRACTOR:

Mitsubishi ElectricalPower Products, Inc.547 Keystone DrWarrendale, PA 15086-7538POC: Gary Kunselmen724.591.3696

START / COMPLETION DATE

10/17/2017 - 1/10/2018

FINAL CONTRACT AMOUNT

$526,894.00

SCOPE OF WORK:

At a high – level, the work involved the degassing and removal

of existing GIS bus, installation of a new 3 pole GIS 550kV

breaker and supporting hardware. Installation of new GIS bus,

bus fittings, and support structures. Installation of new SF6-to-

Air GIS bushings and support structures. Installation of Local

Control Cabinet (LCC) and wiring between LCC and breaker.

Installation of grounding and bonding for the entire system.

Assisted with testing and startup / commissioning activities.

SCOPE OF WORK:

COLY SUBSTATION 550kV GIS

March 7, 2017

Entergy of Louisiana

CONTRACT NO / AWARD DATE:

OWNER:

SUBCONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]

10477166-00007

16-2405

JOB LOCATION:

Independence (ISES) Substation555 Point Ferry RdNewark, AR 72206

POC: Lloyd Cambrelcamb91@entergyPOC: Sal Faisal501.490.4722

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Racy [email protected]

START / COMPLETION DATE

7/1/2016 - 7/1/2017

FINAL CONTRACT AMOUNT

$2,697,910.00

SCOPE OF WORK:

Investigation of the job site, pulling all the cable permanent and

temporary, Replacement of access platforms, terminating of all the

cable permanent and temporary, setting all new control panels,

demoing all old control panels, procurement and installation of

cable tray system, above grade conduit temporary and permanent

in the yard, weekly safety visits, material inventory pre and post,

and relay assistance during all the outages. Installation of 20 new

IPO 230kV Breakers, Assembly & Gassing of 16 (of the 20 IPO ABB

Breakers), Degas & Removal of 14 Existing Breakers, Replace 12 161

kV Switches, Associated Electrical Equipment, & Bus.

SCOPE OF WORK:

INDEPENDENCE SUBSTATION RELAY

June 30, 2016

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

W9127N-17-C-0006

16-2028

JOB LOCATION:

John Day Lock & DamI-84 Exit 109 Rufus, OR 97050

POC: Ryan S ShoemakerT 503.808.4628

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: James [email protected]

START / COMPLETION DATE

11/1/2017 - 11/30/2019

FINAL CONTRACT AMOUNT

$3,992,788.00

SCOPE OF WORK:

The scope of work included removal of (4) existing 500kV hydraulic

group-operated disconnect switches & ground switches. Installed

(4) new 500kV motorized group-operated disconnect switches with

electric operators, surge resistors and motor operated grounding

switches. Also included the construction and installation of new

platforms, ladders and walkways for the operator control stations

and maintenance catwalks.

SCOPE OF WORK:

JOHN DAY 500kV DISCONNECT REPLACEMENT

March 21, 2017

USACE - Portland District333 SW 1st AvePortland, OR 97204

CONTRACT NO / AWARD DATE:

OWNER:

4500849144

16-2026

JOB LOCATION:

Fort Smith Substation707 Rutgers RoadFt Smith, AR 72908

POC: Doug Dauman405.553.4871

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]

START / COMPLETION DATE

1/1/2017 - 12/31/2017

FINAL CONTRACT AMOUNT

$4,715,414.00

SCOPE OF WORK:

Expansion of the existing Fort Smith Substation for the

installation of a new 500/161/13.8kV Bus Tie Transformer 2 and

the demolition and rebuilding of the existing 161kV East

Switchyard. The 500kV section will require expansion to the

south to allow fort he addition of a new line terminal position to

the existing 500kV Ring Bus. The transformer section (East) will

require expansion for the addition of a new Bus Tie Transformer

2 and tertiary equipment. The existing 161kV East section

currently operating as a Ring Bus will require to be demolished

completely (including removal of all existing foundation) in

order to be rebuilt (including installation of foundations) and

operate as a breaker-and-half. The transmission line temporary

re-routes and re-terminations will be by T-Line Contractor. The

jumpers from the transmission lines to the bus or equipment

will be by the substation electrical contractor.

SCOPE OF WORK:

FT SMITH SUBSTATION EXPANSION

November 2016

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

10477166-00007

16-2406

JOB LOCATION:

Independence Substation555 Point Ferry RoadNewark, AR 72562

POC: Sal Faisal

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]: Racy [email protected]

START / COMPLETION DATE

5/29/2016 - 1/23/2017

FINAL CONTRACT AMOUNT

$1,242,239.00

SCOPE OF WORK:

Scope of work consisted of setting breakers, demo equipment and

bus. Installation of equipment and bus and doctor all buss

connections.

SCOPE OF WORK:

INDEPENDENCE SUBSTATION ELECTRICAL

April 2016

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10477166

15-2433

JOB LOCATION:

Mabelvale Substation12303 Vimy Ridge RdMabelvale, AR 72103

POC: Scott McMahan

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Joey [email protected]

START / COMPLETION DATE

6/1/2016 - 5/31/2017

FINAL CONTRACT AMOUNT

$1,365,350.00

SCOPE OF WORK:

Scope of work consisted of:

• Installation of all control house internals (AC panels, DC Panels,

relay panels, telecom rack, throwover switches, etc.)

• Pulled all wire from field device to new control house.

• Pulled all wire from new control house to old control house.

• Replaced 3 CCVT’s on Sheridan line. Replace junction boxes.

• Replaced 2 CCVT”s and c line traps on the Wrightsville line.

• Replaced junction boxes.

• Removed all unused panels in 115kV control house.

SCOPE OF WORK:

MABELVALE SUBSTATION SPOF

April 2016

Entergy of Arkansas5115 Thibault RoadLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

10443358

14-2428

JOB LOCATION:

White Bluff EHV Substation1100 White Bluff RoadRedfield, AR 72132

POC: Bob Wray

GENERAL CONTRACTOR:

Koontz Electric Company, Inc.1223 E BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]: Racy [email protected]

START / COMPLETION DATE

4/20/2015 - 7/1/2016

FINAL CONTRACT AMOUNT

$3,312,219.00

SCOPE OF WORK:

White Bluff Power Plant is a 1,480 megawatt base load coal-fired

power station in Redfield, Arkansas.  It has one of the tallest

chimneys in the world, which was built in 1980.  White Bluff

provides 500kV to the Grid.

 

Koontz Electric scope of work consisted of overseeing the Single

Point Of Failure (SPOF) project at the White Bluff Station.  This

project was completed in (13) phases over an eleven month period

and was competed ahead of schedule with no accidents. It includes

but not limited to the following:

* Replace in-kind, (8) 500kV switches

* Install (11) new 500kV switches

* Install (8) new 500kV SF6 breakers

* Replace and install (22) CCVTs

* Install (32) Relay panels

* Pull over 500,000 feet of control cable

SCOPE OF WORK:

WHITE BLUFF EHV SUBSTATION YARD ADDITION

March 2015

Entergy of Arkansas5115 Thibault RdLittle Rock, AR 72206

CONTRACT NO / AWARD DATE:

OWNER:

4500765233

14-2013

JOB LOCATION:

Fort Smith EHV Substation701 Rutgers RoadFort Smith, AR 72908

POC: Eugene Jenkins405.557.8699

GENERAL CONTRACTOR:

Koontz Electric Co., Inc.1223 East BroadwayMorrilton, AR 72110Project Manager: Joey [email protected]

START / COMPLETION DATE

11/1/2014 - 3/25/2015

FINAL CONTRACT AMOUNT

$1,202,150.00

SCOPE OF WORK:

Koontz was responsible for dressing, wiring-in, oil filling, testing

and commissioning a 400 MVA, 500/161 kV Transformer #3.

Koontz installed the bus work, switches, foundations, and all

associated work. Koontz also replaced the coax 4R33 for Line

Tuner 4LT33 and provided 52/a contacts for Fault Recorder

Indications.

SCOPE OF WORK:

FORT SMITH EHV SUBSTATION

November 2014

OG&E1200 E I-24 Service Road, Bldg. BOklahoma City, OK 73149

CONTRACT NO / AWARD DATE:

OWNER:

132004

JOB LOCATION:

Various Substations throughoutOklahoma, including:Memorial SubstationLakeside SubstationCherry Creek SubstationNE 30th SubstationPark Place SubstationPiedmont SubstationRobinson Substation

POC: Doug Dauman405.553.4871

GENERAL CONTRACTOR:

Koontz Electric Company, Inc1223 East BroadwayMorrilton, AR 72110Project Manager: Paul [email protected]

START / COMPLETION DATE

11/1/2013 - 11/30/2014

FINAL CONTRACT AMOUNT

$616,354.00

SCOPE OF WORK:

The general scope of work for all 7 OG&E Substations consisted of

installing 12.5kV & 34.5kV distribution breakers, 138/12.5 kV

Distribution Transformers, 138/34.5kV Distribution Transformer

and Replace Relay Panels in a 34.5kV Distribution Breaker.

SCOPE OF WORK:

OG&E VARIOUS SUBSTATIONS OKLAHOMA

OG&E 1200 E I-240 Service RdOklahoma City, OK 73149

CONTRACT NO

OWNER:

13894-26B

13-2003

JOB LOCATION:

Pryor Substation3499 Main StPryor, OK 74361

GENERAL CONTRACTOR:

Whiting Turner300 East Joppa RoadBaltimore, MD 21286POC: George FullerT 713.344.8023F 713.996.8937

START / COMPLETION DATE

10/1/2013 - 7/31/2014

FINAL CONTRACT AMOUNT

$3,174,259.00

SCOPE OF WORK:

Koontz Electric was responsible for the following scope of work:

1. Site fill and grading.

2. Sub base and surface rock.

3. Security fence.

4. All concrete foundations.

5. All grounding

6. Concrete encased duct for 3000 Amp TB4, with (8) 6” SCH 80

PVC. Includes (3) 25KV MV 105, 750 MCM w/ 4/0 GRD per

conduit, and (48) 25KV stress cones.

7. (2) 6” PVC conduits per distribution breaker, and (8) 6” SCH

80 PVC conduits, stubbed outside fence 10 feet.

8. 1”, 2”, 3” communication conduits. Includes added manhole

and pull boxes.

9. Conduit and cabling for transformer circuits, (CT’s, Alarms,

Controls).

10. Oil Containment System.

11. All structural steel.

12. Yard lighting on static masts.

13. HV bus, fittings, station arrestors, and insulators.

14. 300 Amp cable bus.

15. Installation of owner furnished transformer; offloading,

placement, assembly, and oil processing.

16. Installation of switchgear building. Furnish quoted

separately.

17. Crane services for above listed items.

SCOPE OF WORK:

PRYOR SUBSTATION

August 2013

Confidential Client

CONTRACT NO / AWARD DATE:

OWNER:

SUBCONTRACTOR:

Koontz Electric Company, Inc1223 East BroadwayMorrilton, AR 72110Project Manager: Harold Andrews501.242.6140

W9128F-11-C-0068

11-2251

JOB LOCATION:

Garrison Dam PowerhouseRiverdale, ND

POC: Mark Mailander (CO)402.995.2488

GENERAL CONTRACTOR:

Koontz Electric Company, Inc1223 E BroadwayMorrilton, AR 72110Project Manager: Jeff [email protected]

START / COMPLETION DATE

3/1/2012 - 8/30/2017

FINAL CONTRACT AMOUNT

$25,011,776.00

SCOPE OF WORK:

This project was a design-build project. Koontz Electric was

responsible for detailed design, procurement and installation of

equipment. The powerhouse is undergoing a major rehabilitation

project that has included mechanical work, new turbines and

rewinds, all of which are complete. The current major rehab

activities center on electrical distribution, switch gear, and control

systems. Specifically, the project included modifying the existing

switchyard and building a new 230/115/15kV switchyard with new

transformers, breakers and disconnect switches. The new

230/115kV switchyar was constructed on site adjacent to the

existing switchyard. The new 230/115kV switchyard design was

incorporate the requirements of the United States Army Corps of

Engineers (USACE) and the design standards of Western Area

Power Administration (WAPA). The layout of the new 230/115kV

switchyard was similar to that of the existing switchyard, except it is

slightly rotated to be perpendicular to the existing incoming 230kV

transmission lines. The 230kV side of the new switchyard was

designed to accommodate future 230kV yard expansion. In

addition to the new switchyard, unit breakers were utilized in the

existing switchyard to connect the new switchyard to the existing

generator transformer feeds. All other equipment in the existing

switchyard was removed.

SCOPE OF WORK:

GARRISON DAM SWITCHYARD UPGRADE

September 22, 2011

US Army Corps of EngineersOmaha District1616 Capitol AveOmaha, NE 68102-4901

CONTRACT NO / AWARD DATE:

OWNER:

2 0 2 0 E N T E R G Y M A I N T E N A N C E

Camden N /OCB B3785Searcy Price / SwitchesHighland Substation / MobileMobile Projects / MaintenanceEl Dorado East / UpgradeUnion Power / Replace 4c2West Helena / MobileHarrison W / Replace Bs212Moro / Replace Failed RegulatorWest Memphis EHV / Repair Sw B881Portia / DemoButterfield / MobileMarianna Substation / MobileGurdon / MobileMcgehee Substation / MobileEl Dorado East / MobileJacksonville North Substation / MMcCrory / MobilePoyen Substation / MobileTexas Newton SubstationTexas / WarrenBlytheville NW / Replace Bus S.Berryville / RehabWalnut Ridge / Replace BreakersDell Substation / CIP LightingEl Dorado Substation / CIP LightingHot Springs Substation / CIP LightingIndependence Substation / CIP LightingMagnet Cove Substation / CIP LightSheridan Substation / CIP LightingWrightsville Substation / CIP LightMcNeil Substation / Replace B3210LVB Substation / RelayGurdon Substation / B0321 & CsANO / Failed CCVTsCrossett North / Replace B2894Jonesboro Substation / Assist / PcsEl Dorado Substation / Wyatt / B0Marvel Substation / Install BusNewport Ind Substation / InstallMarianna Substation / Circuit SwTx / Rivtrin SubstationWest Memphis EHV Substation / RepPoyen Substation / Retire 115kv TrRitchie Substation / Replace 230kvIndependence Substation / Repair BusW. Memphis EHV Substation / ReplaceEl Dorado West Substation / HangMarianna Substation / B0342Tx Yankee Doodle Substation / ConWoodward Substation / ReworkNLR Levy Electrical Rehab EntergyNLR Levy Substation / Electrical ReLVB Substation / Grounds RentalUnion Power EHV Substation / SwCamden Maguire / MobileSheridan EHV Substation / ReplaceDatto Substation Mobile Cap BankGreenway Substation / Recloser

WM Lehi Substation / MobileANO / Animal MitigationMontrose Substation / Failed BreaVarner Substation / RMV RegulatorPB Dierks / Failed BreakerSheridan EHV Substation / JumpersEl Dorado EHV Substation / JumperEl Dorado EHV Substation / CCVTsSmackover Substation / Replace CiGlenwood Substation / MobileWest Helena Substation / Failed WGillett Substation / Breaker C268Onan Skid / GeneratorPB Industrial / Failed 15kvWyatt Substation / TrapWhite Bluff Substation / Failed B79Mabelvale Substation / Wire PullMcNeil Substation / Cable PullEbony SS / Replace SS PoleSouthside Substation / FailureThayer South Substation / FailureGilmore Substation / ElectricalAECC Southland Substation / FailedHs EHV / Breaker FailureNewport Ind / ElectricalANO / Pull CableKeo EHV Substation / GeneratorEl Dorado EHV Replace BusMonticello E / Trap & TunerCrossett North Substation / TrapHermitage Substation / B7867Rutherford Substation / FailureSouthside Substation / MobileOmaha Substation / Circuit SwRussellville East / BreakersWoodward Substation / Pull CableMobile Reg / Jumpers And GroundsHS Ind / Circuit SwANO / Cable Through ExpansionAltheimer Substation / Dead End SGarland Substation / Seal RoofLR West Substation / Replace B3314Emerson Substation / Failed RegulatorEl Dorado Newell / Transformer FMobile / SkidsMcNeil EHV Substation / Cable PullEl Dorado Newell / FailedAubrey AECC / Failed B1348Hs EHV / Pull CableEl Dorado EHV / Failed SwDell EHV / Failed CCCVTImboden Substation / Replace LineBrinkley East Substation / B4480Searcy Price / Control HouseDiamond City Substation / MobileMo Thayer - South / Failure

ENTERGY MAINTENANCE SCOPE:KECI performs maintenance onEntergy’s grid performing allaspects of construction onequipment from 15kV to500kV. Maintenance jobs includebut not limited to 115kV-500kVbreaker replacements, 69kV –500kV switch and MODreplacements, animal mitigationinstallation, control panel changeouts, arrestor replacements, mobileequipment installation andremoval. The scope of work areeither planned maintenance oremergency failed work.

CONTACT INFORMATION:Sarah Turner, PESubstation Operations SupervisorArkansas GridT 501.490.5562 M 501.230.6481

2020 TOTAL TO DATE:$3,093,618.96

2 0 1 9   E N T E R G Y  M A I N T E N AN C E

HARRISON WEST/REPLACE BS212MORO/REPLACE FAILED REGULATORBLYTHEVILLE AB/BREAKER 1002ALUNDSFORD/MOBILEWHITE BLUFF EHV/INSTALL JUMPERSWEST MEMPHIS EHV/REPLACE SW B8815SHERIDAN EHV/REPLACE ARRESTOPORTIA/DEMOSTEPHENS/MOBILEMAGNOLIA WEST/REPLACE BREAKER A208EL DORADO EHV/REPLACE REACTORBUTTERFIELD/MOBILEMARIANNA/MOBILEGURDON/MOBILEMCGEHEE/MOBILEEL DORADO EAST/MOBILEJACKSONVILLE NORTH/MOBILEMCCRORY/MOBILECASH/MOBILEPOYEN/MOBILEISES EHV/STEEL PLATFORMSCROSSETT SOUTH/REPLACE SWITCHGEARTEXAS/NEWTONTEXAS/WARRENEL DORADO EHV/REPLACE FAILEDLITTLE ROCK PORT/CLEAN UPPINE BLUFF EAST/FAILED TRAPWHITE BLUFF EHV/FAILED SWITCHGEARBASELINE/DEMOTEXAS/DAYTONWEST MEMPHIS/KUHN ROAD REPLACEMENTLUNSFORD/ELECTRICALAECC BRYANT SOUTH/FAILED B4641HELENA CENTRAL/CABLE PULLSTEPHENS/FAILED SWITCHGEAR B0976MCCRORY/FAILED SWITCHGEARBERRYVILLE/REHABMCNEIL/FAILED SPARE TRANSFORMER50MVA/MODIFICATIONWALNUT RIDGE/REPLACE BREAKERSDELL/CIP LIGHTINGEL DORADO/CIP LIGHTINGHOT SPRINGS/CIP LIGHTINGINDEPENDENCE/CIP LIGHTINGKEO/CIP LIGHTINGMABELVALE/CIP LIGHTINGMAGNET COVE/CIP LIGHTINGMAYFLOWER/CIP LIGHTINGPLEASANT HILL/CIP LIGHTINGSHERIDAN/CIP LIGHTINGWHITE BLUFF/CIP LIGHTINGWRIGHTSVILLE/CIP LIGHTINGMCNEIL/REPLACE B3210LVB/RELAYGURDON/B0321 & CSWEST MEMPHIS LEHI/FAILED REGULATORANO/FAILED CCTVSCROSSETT NORTH/REPLACE B2894JONESBORO/ASSISTEL DORADO WYATT/B0684MARVEL/INSTALL BUSNEWPORT IND/INSTALL MOBILE LEAMARIANNA/CIRCUIT SWITCHGEARTEXAS/RIVTRINWEST MEMPHIS EHV/REPLACE B8815POYEN/RETIRE 115KV TRANSFORMERRITCHIE/REPLACE 230KV SWS

ISES/REPAIR BUSEL DORADO WEST/HANG GROUND

ENTERGY MAINTENANCE SCOPE:KECI performs maintenance on Entergy’s grid performing all aspects of construction on equipment from 15kV to 500kV. Maintenance jobs include but not limited to 115kV‐500kV breaker replacements, 69kV – 500kV switch and MOD replacements, animal mitigation installation, control panel change outs, arrestor replacements, mobile equipment installation and removal. The scope of work are either planned maintenance or emergency failed work.

CONTACT INFORMATION:

Sarah Turner, PE

Substation Operations Supervisor

Arkansas Grid

T 501.490.5562 | 8.753.5562

M 501.230.6481

2019 TOTAL TO DATE:

$3,738,631.77

JOB LOCATION / DESCRIPTION:RUSSELLVILLE NORTH/REPLACE CIRCUIT SWFORDYCE/CAP & PINNEWPORT AB/MOBILE & SWB554SHERIDAN EHV/PRCR & INST GENWOODWARD/CABLE PULLMOSES/B5835MAGNOLIA E/MBL & REPLACE CIRC SWMAGNOLIA DOW/ELECTRICALCABOT/MOBILESEARCY PRICE/SWITCHESHIGHLAND/MOBILELITTLE ROCK CHICOT/CIRCUIT SWITCHGEAREL DORADO JACKSON/MOBILE SWHOT SPRINGS W/TRANSFORMER CONNECTIONSEL DORADO E/TRANSFORMER DISCONNECTDANVILLE/PIN & CAPDANVILLE/B0530CAMDEN N/RELAYMARKED TREE/CAP BANKLEACHVILLE/MOBILEHARRISON W/ANIMAL MITIGATIONSTUTTGART RICUSKEY/MOBILESEARCY SOUTH/ANIMAL MITIGATIONHARRISON WEST/B215LEACHVILLE/RECLOSERARKLAHOMA/REPLACE SWITCHGILMORE/BREAKER R215FISHER/FAILED REGULATORBENTON NORTH/REPLACE CIRCUIT SWITCHCARPENTER DAM/BREAKERSMAINTENANCE/MOBILESAECC PINEBERGEN/SW REPLACEMENTBLYTHEVILLE/REPLACE 35KV BREAKERBLYTHEVILLE NORTHWEST/REPLACE CARSTS & SWSCEDAR GROVE/MOBILE TRANSFORMERHOT SPRINGS WEST/DIFF PANELNEWPORT IND/ELECTRICAL UPGRADETHAYER, MO NORTH/B1837BLYTHEVILLE NORTH EAST/REPLACE ARRESTORSBLYTHEVILLE AFB/GRNDS FOR SPXHIGHLANDS/CS MODEL DORADO EAST/UPGRADERUSSELLVILLE EAST/CIRCUIT SWGREEN FORREST SOUTH/GRNDS FR NASSGREENBRIER/FAILED BTLE B5763INDEPENDENCE/B6110OMAHA/RELAYMAGNOLIA STL/FIELD REGULATORWHITE BLUFF/CLEAN UPDELL/TRANSFORMER BUSUNION STATION/SW 4C1CMC STEEL/REPLACE FIELD REGULATORSHERRILL/FAILED REGULATORLONG PLANT/DEMOLITIONCABOT/REPLACE FAILED GROUNDSMORGAN/MOBILEMAGNOLIA WEST/FAILED DISCONNECTMABELVALE/FIELD 13.8KV BREAKEREL DORADO LION OIL/ELECTRIC UPGRADENEWPORT AB/FAILED SW & MOBILECASH/FAILED SW & MOBILE MAGNOLIA WEST/REPLACE CABLEBLYTHEVILLE/LNG PLANT DEMOWEST HELENA/MOBILE

2 0 1 8   E N T E R G Y  M A I N T E N AN C E

HELENA CENTRAL/W238WOODWARD/RPLC TRANSFORMRSMCNEIL/TRANSFORMER BANKCND&PUL CBLMGNLIASTEEL/RPLC INSLAKE VLGE BAGBY/RPLC TRAPSYLVAN HILLS/SWITCH B2812LYNCH/PULL DC CABLESHERIDANEHV/PRCR&INST GENARKADELPHIA N/RPLC SWTCHSNLR WESTGATE/RPLC SWITCHMALVERN/MAINTENANCE SWTCHPORT/MOVE MATERIALBATESVILLE/B06372MARKED TREE/JOB/MCCOLONOKE EAST/RPLC CT'SBEARDEN/RPLC FAILED REGCROSSETT WEST/RPLC BREAKRCAMDEN N/CIRC SWITCHERWOODWARD/CABLE PULLANO/LIGHTING ARRESTORSCAMDEN N/OCB B3785ELDORADO EHV/REACTR B0511CAMDEN N/MBL&FAILD BRKR/ENTEWALNUT RIDGE/ANML MITIGTNISES/ASSIST IN WIREWAY/MCCOMOSES/B5835WHT BLUFF EHV/RMV JMPRSDATTO/MOBILE BREATKERMAGNOLIA DOWELL/MOBILEMGNLIA E/MBL&RPLC CIRC SWMAGNOLIA DOW/ELECTRICALNEWARK/B3254ELAINE/ASSIST BRKR CHNGCABOT/MOBILESEARCY PRICE/SWITCHESHIGHLAND/MOBILEANO/GROUNDING TRANSFORMRSLR KANIS/CIRC SWTC REPAIRLR CHICOT/CIRCUIT SWITCHRWHITE BLUFF/SWITCHNEWPORT IND/RPLC REGULATRW MEMPHIS DOVR/RPLC B0188ELDORADO JACKSN/MOBILE SWHELENA CNTRL/XFMR CONECTNELDORADO E/XFMR DISCNECTSEARCY SOUTH/MOBILESTUTTGART RICUSKEY/PTSDANVILLE/PIN&CAPDANVILLE/B0530DANVILLE/BUS DIFF PANELSTUTTGART RICUSKY/RPLC T2ALCOA/ARRESTORSALCOA/CONNECTIONSWALNUT RIDGE/B8751CAMDEN N/RELAY/SHERMARKED TREE/CAP BANKEL DORADO E/MATSELDRDO EHV/RPLC FLD RCTRMALVERN S/RPLC BUSMLVRN S/RPLC BOTTLE ON CSLEACHVILLE/MOBILEMONTICELLO E/JUMPERSHARRISON W/ANIML MITIGATNSTUTTGART RICUSKEY/MOBILESEARCY SOUTH/ANIML MITGTNLVB/TRAP & CCVTHARRISON WEST/B215

EL DORADO EAST/MATSNEWARK/FAILED CTPB DIERKS/SWITCHLEACHVILLE/RECLOSERCHERRYVALLEY/FLD BRKR ASTMGNLA DWELL/LKG XFMR MOBLGILLETT/ASSIST BREAKERWALNUT RDGE W/GRNDS&JMPRSCORNING/ARRESTORSARKLHOMA/FAILED B1040ARKLAHOMA/RPLC SWITCHMAGNLA DOW/CLNUP&XFMR RPRGILMORE/BREAKER R215DUMAS/FAILED SWITCHESFISHER/FAILED REGULATORWALNUT RIDGE/35KV BREAKERAECC GLENDALE/REBLD SWTCHBENTON N/RPLC CIRCUIT SWCARPENTER DAM/BREAKERSMAINTENANCE/MOBILESCEDAR GROVE/MOBL TRNSFRMRHS WEST/DIFF PANELNEWPORT IND/ELECTL UPGRDTHAYER N/B1837BLYTHVL NE/RPLC ARRESTORSBLYTHVL AFB/GRNDS FOR SPXHIGHLAND/CS MODEL DORADO EAST/UPGRADERUSSELLVILLE E/CIRCUIT SWGRN FORST S/GRNDS FR NASSGREENBR/FAILED BTLE B5763INDEPENDENCE/B6110OMAHA/RELAYMAGNOLIA STL/FLD REGULATRDELL/TRANSFORMER BUSUNION STATION/SW 4C1SHERRILL/FAILED REGULATOR/ENTE

ENTERGY MAINTENANCE SCOPE:KECI performs maintenance on Entergy’s grid performing all aspects of construction on equipment from 15kV to 500kV. Maintenance jobs include but not limited to 115kV‐500kV breaker replacements, 69kV – 500kV switch and MOD replacements, animal mitigation installation, control panel change outs, arrestor replacements, mobile equipment installation and removal. The scope of work are either planned maintenance or emergency failed work.

CONTACT INFORMATION:

Sarah Turner, PE

Substation Operations Supervisor

Arkansas Grid

T 501.490.5562 | 8.753.5562

M 501.230.6481

2018 TOTAL TO DATE:

$3,903,792

JOB LOCATION / DESCRIPTION:COFER/34.5KV SWITCHLR CMCK/RPLCHS EHV/CCVTHARRISON E/RPLC B1636STRONG/JUMPERS ON T1NEWPORT/MOBILEJUNCTION CITY/RELAYMANN RD/ADD FEEDER BAYSSTUTGRT RCKSY/RPLC BRK T1FISHER/FAILED 15KV BREAKRHERIDAN/GENERATOR TESTGCUSHMAN/MOBILE&SWCUSHMAN/SW B0449PORT/CLEAN UP YARDBATSVLE/RPLC SW C&P ARSTRDARDANELLE/CAP&PINRSVL NORTH/RPLC CIRCUITSWMVA MOBILE/REPAINTMOBILE/161KV SWITCH TRLRCHRRYVALY/ANML MTGTN&MOBLFORDYCE/ANIMAL MITIGATIONELDORADO NEWLL/ANML MTGTNHARRISON EAST/DIFF PANELCHERRYVALLEY/MOBILEFORDYCE/CAP & PINFORDYCE/115KV CAP & PINDATTO/MOBILE CAP BANKSEARCY PRICE/CAP&PINEARCY PRICE/RPLC B4153NEWPORT AB/MOBILE&SWB554HARRISON EAST/RPLC LN TRPHARRISON E/RPLC B5136NEWPORT/FAILED A TOWERGREEN FOREST N/SW FAILURECARPNTR DAM/ANML MITIGATNANO/CABLE PULLW MEMPHIS EHV/B2600 BRKRGURDON/REMVE OLD EQUIPMNTPB PORT/RPLC FAILED EQUIPJACKSNVILE N/RECONFIG BUSCEDAR GROVE/MOBILEHARRISON E/DELIVR MATRIALBAUCUM/MOBILEDRIVER/PULL CABLEEL DORADO PARNELL/MOBILEELDORADO LION/RPLC 2 SWSLR WEST/RPLC B3314NEWPORT/MOBILEELDORADO LION/MOBILEMARKED TREE/MOBILENEWARK/MOBILEDRIVER/HARDENINGBAUCUM/FAILED FEED BRKRDANVLLE/FAILD SWTCH B2530DRIVER/RPLC FAILD REACTORANO/B8351ANO/ADSSNEWARK/RPLC SW B3257SAGE/MOBILE WORKPOWERLINE/HARDENINGMONETTE JCT/DEMOMALVERN/ISOLATE SWGRHUTTIG/MOBILEFORREST CITY/TOWER LGTSNEWPORT IND/INSULATORSHUTTIG/RPLC CIRC SWTR&TWRANO/RPLC PT'S

2 0 1 7   E N T E R G Y  M A I N T E N AN C E

GOODWIN ROAD/REPLACE CTS/ENTE

GREEN FORREST SOUTH/ADD TRANSFORMER 

BAY/ENTE

HARDY NORTH/FIBER/ENTE

HARRISON EAST/DELIVER MATERIAL/ENTE

HELENA CENTRAL/W238/ENTE

HUTTIG/MOBILE/ENTE

HUTTIG/REPLACE CIRCUIT SWITCHER & 

TOWER/ENTE

INDEPENDENCE/HARDENING/ENTE

Independence/SF6 MOVE/ENTE

JACKSONVILLE N/RECONFIGURE BUS/ENTE

JACKSONVILLE NORTH/MOBILE BREAKER/ENTE

KANIS/ELECTRICAL/ENTE

KEO/B4941 & JUMPERS/ENTE

LAKE VILLAGE BAGBY/RPLC TRAP/ENTE

LITTLE ROCK EAST/RPLC SWITCH B0186/ENTE

LONOKE EAST/RPLC FAILED CT'S/ENTE

LR ARCH/RPLC JUMPERS/ENTE

LR WEST/RPLC B3314/ENTE

LR WEST/RPLC CAP & PIN/ENTE

LR WEST/RPLC INSULATORS/ENTE

LYNCH/PULL DC CABLE/ENTE

MABELVALE/2018 ELECTRICAL WORK/ENTE

MAGNOLIA STEEL/INSTALL LACING RPLC 

INSULATORS & ARRESTORS/ENTE

MALVERN/ISOLATE SWGR/ENTE

MALVERN/MAINTENANCE SWITCH/ENTE

MANCHESTER/YARD EXPANSION/ENTE

MARKED TREE/ADJUST BLADES/ENTE

MARKED TREE/MOBILE/ENTE

MAYHAMONETTE JUNCTION/DEMO/ENTE

MT PLEASANT/SWITCH ADJUSTMENT/ENTE

MULTIPLE SITES/GENERATOR 

MAINTENANCE/ENTE

NEWARK/MOBILE/ENTE

W, TX/MOBILE CREW/ENTE

MCNEIL/TRANSFORMER BANK/ENTE

NEWARK/RPLC SW B3257/ENTE

NEWARK/SUBSTATION/ENTE

NEWPORT INDUSTRIAL/INSULATORS/ENTE

NEWPORT/MOBILE/ENTE

NEWPORT/RPLC CONTROL PANEL/ENTE

NLR DIXIE/RELAY/ENTE

NLR WESTGATE/RPLC FAILED SWITCH/ENTE

PB PORT/RPLC FAILED EQUIPMENT/ENTE

PORT/MOVE MATERIAL/ENTE

POWERLINE/HARDENING/ENTE

ROHWER/OUTAGE/ENTE

RUSSELLVILLE EAST/INSTALL CONDUIT & PULL 

CABLE/ENTE

SAGE/MOBILE WORK/ENTE

SHERIDAN EHV/PROCURE & INSTALL 

GENERATOR/ENTE

STUTTGART RICUSKEY/TRAP/ENTE

STUTTGART/TLW989/ENTE

STUTTGART/TSW031/ENTE

STUTTGART/TSW042/ENTE

SYLVAN HILLS/RPLC SWITCH B2812/ENTE

WALNUT RIDGE/INSULATOR FAILURE/ENTE

WOODWARD/CABLE PULL/ENTE

WOODWARD/RPLC TRANSFORMERS/ENTE

ENTERGY MAINTENANCE SCOPE:

KECI performs maintenance on Entergy’s grid 

performing all aspects of construction on 

equipment from 15kV to 500kV. Maintenance 

jobs include but not limited to 115kV‐500kV 

breaker replacements, 69kV – 500kV switch 

and MOD replacements, animal mitigation 

installation, control panel change outs, 

arrestor replacements, mobile equipment 

installation and removal. The scope of work 

are either planned maintenance or 

emergency failed work.

CONTACT INFORMATION:

Entergy of Arkansas

Mike Pate

T 501.490.4771

[email protected]

2017 TOTAL TO DATE:

$4,684,009

JOB LOCATION / DESCRIPTION:

AECC/AMERICAN GOVERNOR COMPANY

ANO/ADSS/ENTE

ANO/B0125/ENTE

ANO/B8351/ENTE

ANO/LIGHTING ARRESTORS/ENTE

ANO/MABELVALE ELECTRICAL UPGRADE/ENTE

ANO/PREWORK B0125 & B0126/ENTE

ANO/RPLC INTERRRUPTERS/ENTE

ANO/RPLC PT'S/ENTE

ANO/SPOF AUTO/ENTE

ANO/SPOF UNIT 2/ENTE

ANO/SPOF‐UNIT 1/ENTE

ARKADELPHIA NORTH/RPLC SWITCHES/ENTE

BATESVILLE/B06372/ENTE

BATESVILLE/RPLC SWITCHES C&P INSULATORS

BAUCUM/FAILED FEED BREAKER/ENTE

BAUCUM/METERING CTS&PTS/ENTE

BAUCUM/MOBILE/ENTE

BEARDEN/RPLC FAILED REGULATOR/ENTE

BEAUMONT, TX/MOBILE CREW/ENTE

BLYTHEVILLE I55 N/CIRCUIT SWITCHER REPAIR

BONO/ELECTRICAL&RELAY/ENTE

BONO/NEW SUBSTATION/ENTE

CAMDEN MCGUIRE/BUS RECONFIGURATION

CAMDEN McGUIRE/MOBILE

CAMDEN McGUIRE/RPLC BREAKER

CAMDEN NORTH/CIRCUIT SWITCHERS

CEDAR GROVE/MOBILE/ENTE

CONWAY WEST/ASSIST CT RPLC/ENTE

CORNING/BREAKERS/ENTE

CORNING/AC POWER TO CONTROL HOUSE

CORNING‐DATTO/ELECTRICAL/ENTE

CROSSETT WEST/RPLC FAILED BREAKER/ENTE

DANVILLE/SWITCH FAILURE B2530/ENTE

DRIVER/HARDENING/ENTE

DRIVER/PULL CABLE/ENTE

DRIVER/RPLC FAILED REACTOR/ENTE

EL DORADO LION/MOBILE/ENTE

EL DORADO LION/RPLC 2 SWS/ENTE

El DORADO PARNELL/MOBILE/ENTE

FLIPPIN/TELECOM/ENTE

FORREST CITY/TOWER LIGHTS/ENTE

GAINSVILLE/SWAP/ENTE

JOB LOCATION / DESCRIPTION:

W MEMPHIS EHV/RPLC REACTR/ENTEMABELVALE/SUBST HARDENING/ENTEMAGNET COVE EHV/HARDENING/ENTEHOT SPRINGS EHV/HARDENING/ENTESHERIDAN EHV/HARDENING/ENTEWHITE BLUFF EHV/SUB HARD/ENTEKEO/SUBSTATION HARDENING/ENTEHOLLAND BOTTOMS/SUBS HARD/ENTEWRIGHTSVILLE/SUBST HARDEN/ENTEETTA/SUBSTATION HARDENING/ENTEEL DORADO/SUBSTATION HARD/ENTEDELL/SUBSTATION HARDENING/ENTEINDEPENDENCE/SUBST HARDEN/ENTEMAYFLOWER/SUBST HARDEN/ENTESAN SOUCI/SUBST HARDEN/ENTEPLEASANT HILL/SUBST HARD/ENTEWOODWARD/SUBST HARDEN/ENTEMCNEIL/SUBSTATION HARDEN/ENTEWEST MEMPHIS/SUSBT HARDEN/ENTENLRMCLMT/RPLC B0980 CRCSW/ENTEHENSLEY/RPLC TLINE SWITCH/ENTEPARAGLD/REMOV 35KV EQPMNT/ENTEWHITE BLUFF/FIBER/ENTELEWISVILLE/CIRCT SW B0973/ENTELR GNES & GRLND/HNG GRNDS/ENTEMABELVALE/BUS REPAIR/ENTEJACKSONVILLE SOUTH/REMOB/ENTEW MEMPHIS EHV/SWTCH WORK/ENTECOFER/34.5KV SWITCH/ENTEMONTICELLO EAST/MOBILE/ENTELR KANIS/LINE TRAP/ENTELR PINNACLE/LINE TRAP/ENTEBRINKLEY E/2016 WORK PLAN/ENTESTUTGRT RCSKY/LINE OUTAGE/ENTEWEST HELENA/LINE OUTAGE/ENTEANO/B5102 BREAKER/ENTEANO/B5122 BREAKER/ENTE23RD & SPRING/FIBER PULL/ENTEMCCLELLAN/FIBER PULL/ENTESTTGRT RCSKY/T#2 HANG GRD/ENTEANO/FIBER/ENTENEWPORT IND/EMRGNCY MOBL/ENTELRPORT/RPLC FLD 15KV BRKR/ENTEELDORADOUPLND/TELECOM MSK/ENTEGIFFORD/TELECOM MAST/ENTELEWISVILLE/R1/ENTEWHITE BLUFF/UNLOAD BRK/ENTEJCKSNVL S/RPLC CRCT SW G/ENTEPOCAHNTS S/RPLC OCB FDR/ENTEATKINS/RPLC CRC SWG B0410/ENTEMGNLASTL/1LINE SECT B0881/ENTEARKDLPHA N/RPLC CIR B0116/ENTEMAGNLIA STL/ONLN SCTB0644/ENTE

2 0 1 6   E N T E R G Y  M A I N T E N AN C E   J O B   L I S T

WHITE BLUFF 230KV/WIREWAY/ENTEWHTE BLFF/RPLC 500KVINSLR/ENTECLARENDN/RPLC FEEDER W160/ENTECLARENDN/RPLC FEEDER F160/ENTEMONETTE JCT/RPLC CIRC SWT/ENTEHAMBURG/RPLC REGULATOR/ENTEDERMOTT/SWITCH/ENTETX E MALVRN/RPLC SW B4724/ENTESEARCY S/RPLC FAILD B0525/ENTEGALLOWAY/RPLC SW B4892/ENTEDIAMOND CITY/MOBILE/ENTEMONETTE JCT/MOBILE/ENTEPARKIN/MOBILE/ENTEROHWER/MOBILE/ENTEPOCAHONTAS S/ARSTRS & INS/ENTEPOCAHONTAS SOUTH/BREAKERS/ENTEANO/REMOVE SW & BREAKER/ENTEWHT BLUFF/RPLC CCVT B3356/ENTEELDRO NWL/RPLC CIRC SWTR/ENTECRPNTRDAM/RMV HSEHV LNTRP/ENTEHS EHV/ RELAY WORK/ENTEWHITE BLF/AVIATION LIGHTS/ENTEW MEMPHS EHV/RMV DLGE SYS/ENTECORNING/SHIELDING MAST/ENTEPARKIN/RPLC CIRC SW/ENTEHSEHV/RPLC LN TRP & TUNRS/ENTEHARRISON EAST/RELAY WORK/ENTEWHTEBLFF/500 RPLC SWB7902/ENTESHERIDAN/500RPLC SW B5023/ENTEHENSLEY/RPLC SWITCHES/ENTEMULTI SITE/FIBER TERM/AECCSTRONG/RPLC REGULATOR/ENTEDRIVER/SUBST HARDEN/ENTEWHITE BLUFF/SET CTS/ENTECLARENDON/MOBILE&B7645/ENTEMONETTE JCT/RELAY/ENTEWEST MEM GTWY/RPLC REGLTR/ENTEMONETTE JCT/RELAY T1/ENTEMARVELL/BREAKR & REGULATR/ENTELR ALXNDR/T3 THRWOVR SWTH/ENTEHS EHV/CCVT/ENTEREED/SWITCHES/ENTEHARRISON E/RPLC LINE TRAP/ENTEBAUCUM/MOBILE/ENTEHARRISON E/CIRCUIT SW/ENTECASH/MOBIL/ENTEBRINKLEY EAST/B8076/ENTEMARION/MOBILE & B2629/ENTE

LR ALEXANDER/JUMPERS T2/ENTEWHITE BLUFF/LAYDOWN AREA/ENTECORNING/SHIELDING MAST/ENTEPANEL/PICKUP&DELIVERY/ENTEWST HELENA/RPLC 3 CCVTS/ENTEBAUCUM/MOBILE FOR TESTING/ENTENEWPORT/CONSTRUCTION/ENTE

ENTERGY MAINTENANCE SCOPE:

KECI performs maintenance on 

Entergy’s grid performing all aspects of 

construction on equipment from 15kV 

to 500kV. Maintenance jobs include but 

not limited to 115kV‐500kV breaker 

replacements, 69kV – 500kV switch and 

MOD replacements, animal mitigation 

installation, control panel change outs, 

arrestor replacements, mobile 

equipment installation and 

removal. The scope of work are either 

planned maintenance or emergency 

failed work.

CONTACT INFORMATION:

Entergy of Arkansas

Mike Pate

T 501.490.4771

[email protected]

2016 TOTAL TO DATE:

$3,910,582.75

Koontz Electric Company, Inc. welcomes an opportunity to make your next project a success. We

maintain a professional and technical staff to support our expert field team of technicians and

craftsman. Please contact any one of the Koontz Management team listed below for more information.

Name Title Cell Phone Email

Benny Koontz President / CEO (501) 977-6086 [email protected]

Dean Hoover Executive Vice President / COO (501) 977-6063 [email protected]

W. Mark Day Executive Vice President / CFO (501) 977-6528 [email protected]

Bryce Koontz Vice President - Business Development (501 289-0965 [email protected]

Jeff Ludwig Vice President - Project Management (501) 977-6098 [email protected]

Jamie Zimmerman Project Engineer (501) 977-6538 [email protected]

Paul Zimmerman Project Engineer (501) 977-6545 [email protected]

Koontz Electric Company, Inc. 1223 East Broadway Morrilton, Arkansas 72110 501-354-2526 http://www.koontzelectric.com