Minutes of the 675th Meeting of SEIAA dated 08.04.2021

132
(Tanvi Sundriyal) Member Secretary (R.K. Sharma) Member (Rakesh K. Shrivastava) Chairman 675 th SEIAA Meeting dtd. 08.04.2021 Page 1 of 132 Minutes of the 675 th Meeting of SEIAA dated 08.04.2021 The 675 th meeting of the State Level Environment Impact Assessment Authority was convened on 08.04.2021 at the Authority's Office in Environmental Planning and Co- Ordination Organization (EPCO), Paryavaran Parisar, Bhopal. The meeting was chaired by Shri Rakesh K. Shrivastava, Chairman, SEIAA. The following members attended the meeting:- 1 Shri R.K. Sharma Member 2. Smt. Tanvi Sundriyal Member Secretary Following mining cases and other than mining cases have been considered:- S.No Case No. Category No. & date of latest SEAC & SEIAA meeting 1. 8363/2021 8 (a) 498 th SEAC meeting dated 06-04-21 2. 8364/2021 8 (a) 498 th SEAC meeting dated 06-04-21 3. 6878/2020 1 (a) 498 th SEAC meeting dated 06-04-21 4. 6880/2020 1 (a) 498 th SEAC meeting dated 06-04-21 5. 8482/2021 1 (a) 498 th SEAC meeting dated 06-04-21 6. 8483/2021 1 (a) 498 th SEAC meeting dated 06-04-21 7. 8484/2021 1 (a) 498 th SEAC meeting dated 06-04-21 8. 8485/2021 1 (a) 498 th SEAC meeting dated 06-04-21 9. 8486/2021 1 (a) 498 th SEAC meeting dated 06-04-21 10. 8488/2021 1 (a) 498 th SEAC meeting dated 06-04-21 11. 8489/2021 1 (a) 498 th SEAC meeting dated 06-04-21 12. 8525/2021 1 (a) 498 th SEAC meeting dated 06-04-21 13. 8505/2021 1 (a) 498 th SEAC meeting dated 06-04-21 14. 8501/2021 1 (a) 498 th SEAC meeting dated 06-04-21 15. 8507/2021 1 (a) 498 th SEAC meeting dated 06-04-21 16. 8514/2021 1 (a) 498 th SEAC meeting dated 06-04-21 17. 8509/2021 1 (a) 498 th SEAC meeting dated 06-04-21 18. 8508/2021 1 (a) 498 th SEAC meeting dated 06-04-21 19. 8513/2021 1 (a) 498 th SEAC meeting dated 06-04-21 20. 8512/2021 1 (a) 498 th SEAC meeting dated 06-04-21 21. 8511/2021 1 (a) 498 th SEAC meeting dated 06-04-21 22. 8506/2021 1 (a) 498 th SEAC meeting dated 06-04-21 23. 8523/2021 1 (a) 498 th SEAC meeting dated 06-04-21 24. 8527/2021 1 (a) 498 th SEAC meeting dated 06-04-21 25. 8487/2021 1 (a) 498 th SEAC meeting dated 06-04-21 26. 8516/2021 1 (a) 498 th SEAC meeting dated 06-04-21 27. 8515/2021 1 (a) 498 th SEAC meeting dated 06-04-21 28. 8517/2021 1 (a) 498 th SEAC meeting dated 06-04-21 29. 8503/2021 1 (a) 498 th SEAC meeting dated 06-04-21 30. 8502/2021 1 (a) 498 th SEAC meeting dated 06-04-21 31. 8504/2021 1 (a) 498 th SEAC meeting dated 06-04-21 32. 8521/2021 1 (a) 498 th SEAC meeting dated 06-04-21 33. 8499/2021 1 (a) 498 th SEAC meeting dated 06-04-21 34. 8498/2021 1 (a) 498 th SEAC meeting dated 06-04-21 35. 8497/2021 1 (a) 498 th SEAC meeting dated 06-04-21 36. 8496/2021 1 (a) 498 th SEAC meeting dated 06-04-21 37. 8495/2021 1 (a) 498 th SEAC meeting dated 06-04-21 38. 8494/2021 1 (a) 498 th SEAC meeting dated 06-04-21

Transcript of Minutes of the 675th Meeting of SEIAA dated 08.04.2021

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 1 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

The 675th meeting of the State Level Environment Impact Assessment Authority was convened on 08.04.2021 at the Authority's Office in Environmental Planning and Co-Ordination Organization (EPCO), Paryavaran Parisar, Bhopal. The meeting was chaired by Shri Rakesh K. Shrivastava, Chairman, SEIAA. The following members attended the meeting:-

1 Shri R.K. Sharma Member

2. Smt. Tanvi Sundriyal Member Secretary

Following mining cases and other than mining cases have been considered:-

S.No Case No. Category No. & date of latest SEAC & SEIAA meeting 1. 8363/2021 8 (a) 498th SEAC meeting dated 06-04-21 2. 8364/2021 8 (a) 498th SEAC meeting dated 06-04-21 3. 6878/2020 1 (a) 498th SEAC meeting dated 06-04-21 4. 6880/2020 1 (a) 498th SEAC meeting dated 06-04-21 5. 8482/2021 1 (a) 498th SEAC meeting dated 06-04-21 6. 8483/2021 1 (a) 498th SEAC meeting dated 06-04-21 7. 8484/2021 1 (a) 498th SEAC meeting dated 06-04-21 8. 8485/2021 1 (a) 498th SEAC meeting dated 06-04-21 9. 8486/2021 1 (a) 498th SEAC meeting dated 06-04-21 10. 8488/2021 1 (a) 498th SEAC meeting dated 06-04-21 11. 8489/2021 1 (a) 498th SEAC meeting dated 06-04-21 12. 8525/2021 1 (a) 498th SEAC meeting dated 06-04-21 13. 8505/2021 1 (a) 498th SEAC meeting dated 06-04-21 14. 8501/2021 1 (a) 498th SEAC meeting dated 06-04-21 15. 8507/2021 1 (a) 498th SEAC meeting dated 06-04-21 16. 8514/2021 1 (a) 498th SEAC meeting dated 06-04-21 17. 8509/2021 1 (a) 498th SEAC meeting dated 06-04-21 18. 8508/2021 1 (a) 498th SEAC meeting dated 06-04-21 19. 8513/2021 1 (a) 498th SEAC meeting dated 06-04-21 20. 8512/2021 1 (a) 498th SEAC meeting dated 06-04-21 21. 8511/2021 1 (a) 498th SEAC meeting dated 06-04-21 22. 8506/2021 1 (a) 498th SEAC meeting dated 06-04-21 23. 8523/2021 1 (a) 498th SEAC meeting dated 06-04-21 24. 8527/2021 1 (a) 498th SEAC meeting dated 06-04-21 25. 8487/2021 1 (a) 498th SEAC meeting dated 06-04-21 26. 8516/2021 1 (a) 498th SEAC meeting dated 06-04-21 27. 8515/2021 1 (a) 498th SEAC meeting dated 06-04-21 28. 8517/2021 1 (a) 498th SEAC meeting dated 06-04-21 29. 8503/2021 1 (a) 498th SEAC meeting dated 06-04-21 30. 8502/2021 1 (a) 498th SEAC meeting dated 06-04-21 31. 8504/2021 1 (a) 498th SEAC meeting dated 06-04-21 32. 8521/2021 1 (a) 498th SEAC meeting dated 06-04-21 33. 8499/2021 1 (a) 498th SEAC meeting dated 06-04-21 34. 8498/2021 1 (a) 498th SEAC meeting dated 06-04-21 35. 8497/2021 1 (a) 498th SEAC meeting dated 06-04-21 36. 8496/2021 1 (a) 498th SEAC meeting dated 06-04-21 37. 8495/2021 1 (a) 498th SEAC meeting dated 06-04-21 38. 8494/2021 1 (a) 498th SEAC meeting dated 06-04-21

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 2 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

1. Case No 8363/2021 : Environmental clearance for Construction of Group Housing Project "Sagar Eden Garden " at Khasra No. 447, 449/1, 447,449/2, 447,449/3, 449/1/1 at Village-Bawadiya kalan, Tehsil- Huzur, District- Bhopal, M. P. Total Project area - 10687.51 sq.m.(1.07 ha) Total Built up Area- 21,864.23 sq.m. by Partner, MS AYUSH ENTERPRISES Sagar Plaza, 250, zone 2 MP Nagar Bhopal, M.P. 462016 E-mail: [email protected] Mob No. 8602252541

1. The proposed Residential project “Sagar Eden Garden - Phase I” located at Khasra No. 447, 449/1, 447,449/2, 447,449/3,449/1/1 at Village-Bawadiya kalan, Tehsil- Huzur, District- Bhopal, Madhya Pradesh, India. Area of proposed scheme is 10687.51 m2 (1.07 Hect.) and it offers 2 BHK, 3 BHK, 4 BHK apartments with LIG/EWS flats.

2. The Co-ordinates of the project site are latitude from 23°10'32.64"N to 23°10'35.80"N and longitude from 77°27'42.84"E to 77°27'48.87"E. The proposed project is covered in topo sheet no.-F43F8, Survey of India (SOI).

3. As this is a violation case as 91% of construction work has been completed without getting prior environment clearance due to unawareness and therefore

39. 8490/2021 1 (a) 498th SEAC meeting dated 06-04-21 40. 8520/2021 1 (a) 498th SEAC meeting dated 06-04-21 41. 8522/2021 1 (a) 498th SEAC meeting dated 06-04-21 42. 8519/2021 1 (a) 498th SEAC meeting dated 06-04-21 43. 8526/2021 1 (a) 498th SEAC meeting dated 06-04-21 44. 8530/2021 1 (a) 498th SEAC meeting dated 06-04-21 45. 8298/2021 1 (a) 498th SEAC meeting dated 06-04-21 46. 8138/2021 1 (a) 498th SEAC meeting dated 06-04-21 47. 8266/2021 1 (a) 498th SEAC meeting dated 06-04-21 48. 8267/2021 1 (a) 498th SEAC meeting dated 06-04-21 49. 8500/2021 1 (a) 498th SEAC meeting dated 06-04-21 50. 8518/2021 1 (a) 498th SEAC meeting dated 06-04-21 51. 8529/2021 1 (a) 498th SEAC meeting dated 06-04-21 52. 6923/2020 1 (a) 498th SEAC meeting dated 06-04-21 53. 8524/2021 1 (a) 498th SEAC meeting dated 06-04-21 54. 8493/2021 1 (a) 498th SEAC meeting dated 06-04-21 55. 8510/2021 1 (a) 498th SEAC meeting dated 06-04-21 56. 8475/2021 1 (a) 498th SEAC meeting dated 06-04-21 57. 8491/2021 1 (a) 498th SEAC meeting dated 06-04-21 58. 8492/2021 1 (a) 498th SEAC meeting dated 06-04-21 59. 8543/2021 1 (a) EC Transfer 60. 8545/2021 1 (a) EC Transfer 61. 5497/2019 1 (a) EC Transfer 62. 4509/2015 1 (a) EC Transfer 63. 2921/2015 1 (a) EC Transfer 64. 2470/2015 1 (a) Change in name of company 65. 2466/2015 1 (a) Change in name of company 66. 3769/2015 1 (a) Change in name of company 67. 3753/2015 1 (a) Change in name of company 68. 489/2009 1 (a) Change in name of company 69. 664/2012 1 (a) Change in name of company 70. 1726/2013 1 (a) Change in name of company

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 3 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

admits committing the violation to the provisions of EIA Notification, 2006 & its amendments. The construction work is stopped once project proponent becomes aware of violations. Construction work causes land disturbance by removal of vegetation, loss of topsoil, increased erosion.

Total Built-up Area 21,864.23 sqm (100%) Till date constructed Built-up Area 19898.44 sqm (91 %)

Construction to be done 1967.79 sqm (9%)

4. The case was presented by the PP and their consultant in the 492nd SEAC dated 19/03/2021 wherein it was observed that this is a violation project and about 70% occupation has been completed and PP has applied for TOR in the window period provided by MoEF&CC vide Notification dated 09/Sep/2019.

5. Regarding violation PP has submitted that in the proposed project total proposed FAR was 19069.18 Sq.mt. which was <20000 Sq.mt.In view of that proponent had not applied for the prior Environmental Clearance of the project. At the time of consent (CTE) application it has been confirmed by the MPPCB that the total project built up area is 19069.18 Sq.mt + 2795.05 Sq.mt. Basement Area = 21864.23 Sq.mt. which is above 20000 sq.mt. well within the limit of EC Application.

6. The Environmental Impact Assessment Notification dated 14th September 2006 as amended to date, states that all project under Item 8(a) shall be appraised as Category B and requires environment clearance from State Environment Impact Assessment Authority. However as the present project is a violation project, it was required to prepare an EIA Report.

7. M/s Ayush Enterprises is introducing their new residential project “Sagar Eden Garden – Phase I” at Bawadia Kalan, Bhopal. The project possesses a hedonistic design, completely in accordance with nature’s bounty. Offer premium living experience. The group housing project contains an integrated township of luxury apartments with varied options of 2, 3, &4 BHK. The project is offering various kinds of housing units to suite everyone’s requirement with maximum benefit and minimum costs.

8. “Sagar Eden Garden - Phase I” has total plot area of 10,687.51 sqm. Area under 24m wide road widening is 1,389.48 sqm and net planning area is 9,298.03 sqm. Total built-up area is 21,864.23 sqm{15,096.23 sqm FAR + 6,768 sqm Non-FAR (2795.05 sqm stilt area + 2795.05 sqm basement area + 1,085 sqm informal sector +92.90 sqm service area)}. Construction work has been completed till 91% of built-up area owing to unawareness of the EIA Notification and its amendments and falls under the purview of the EIA Gazette Notification dated 08.03.2018, amending the Notification dated 14th March 2017. This report has been prepared in compliance to Gazette Notification dated 08.03.2018, amending the Notification dated 14th March 2017 including assessment on ecological damage, remediation plan and natural and community resource augmentation plan.

9. Van Vihar National Park is 10.1 km (NW) from the site.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 4 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

10. The application of ToR was presented before SEAC on 492nd dated 19.03.2021,.The ToR was granted by the SEIAA dated 30th March, 2021. PP has submitted the EIA report vide letter dated 30/3/2021 which was forwarded to SEAC vide letter no. 45 dated 01/4/2021, which was placed before the committee.

11. The case was discussed in SEAC 498th meeting dtd. 06.04.21, and recommended the EC subject to the special conditions and submission of bank gurantee (BG) with three years validity of Rs.. 19.65 Lakh (equivalent to amount proposed in remediation and resource augmentation plan) with the MP Pollution control Board.

12. After the deliberation the case was discussed in detail and recorded that:-

i. Regarding land documents PP has submitted Khasra Panchsala 2013-14.As per the land documents the landownership is the name of MS AYUSH ENTERPRISES through Partner Shri Sanjeev Agrawal, & Kiran Agrawal.

ii. The total water requirement during operation phase will be 175 KLD of which 103 KLD shall be fresh water requirement while 72 KLD of treated water shall be required for flushing and miscellaneous use. The Main source of water supply will be Municipal water supply. Water supply permission has been obtained from Office of Municipal Corporation, Bhopal (Water Supply Division) vide letter no. 749/S. Y./ Z. K. / ZONE K. 13/2019, Bhopal dated 01.02.2019.

iii. The waste water 148 KLD will be generated during the operation phase and generated waste water shall be treated in a sewage treatment plant of 180 KLD capacity based on MBBR technology. Extra treated water of 65.0 KLD will be drained to sewer line. PP has submitted letter dtd. 23.02.19 issued by Municipal Corporation, Bhopal for disposal of extra treated waste water.

iv. Total waste 585 Kg/day, this consist all types of wastes (as Organic waste 321.75 Kg/day and non- organic waste 263.25 Kg/day) and these all type of waste shall be treated/ disposed off as per provision made in the MSW Rules 2016.The biodegradable portion of MSW will be treated at site by 1 Organic Waste Converter of 1000 kg per day capacity and manure generated will be used for plantation. The non-biodegradable fraction like plastic, tin, glass etc. will be sold to local recyclers. Horticultural waste shall be collected and disposed-off with biodegradable waste. Rest inert MSW will be handed over to Municipal Corporation for final disposal. PP has submitted letter dtd. 25.02.19 issued byMunicipal Corporation, Bhopal for disposal of solid waste.

v. Power would be drawn from Madhya Pradesh Kshetra Vidyut Vitran Company Limited. The total maximum demand would be 750 KVA. Backup source 1 DG sets of 125 KVA using HSD fuel will be used which will be used in emergency condition. Proponent has taken various energy conservation measures which include:

Passive solar refers to the use of Sun’s energy for the heating and cooling of living spaces.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 5 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

The orientation of the building has been done in such a way that maximum daylight is available.

The orientation of the building will be done in such manner that most of grazed areas will face north and east.

Lesser opening will be provided on the west facing walls.

Landscape and greens areas will be so spaced to cool the surrounding environment, which will reduce energy consumption.

Greenbelt in the site will be maintained by the project proponents, which would have an overall cooling effect on the surroundings.

Using electronic ballast for discharge lamps.

Use of Solar backed LED landscape lights instead of par lamps.

Solar lighting installation is proposed, it will cover approx. 30% of total common lighting. In this project, all energy saving equipments installed with star ratings. LED lights have been used in entire project.

vi. The storm water collection system for the common areas of the proposed project like parks, roads, pavements, etc. will be provided by project proponent. The amount of run-off depends upon many factors such as intensity and duration of precipitation, characteristics of the tributary area and the time required for such flow to reach the drains. The drains shall be located near the carriage way along either side of the roads. Taking the advantage of road camber, the rainfall run off from roads shall flow towards the drain.

vii. After the completion of the project and rainwater harvesting structures, there will be total ground water recharge would be 230 m3/hr. Proposed recharge potential to be created by the project would improve ground water regime of the area and would contribute to positive groundwater environment. We have proposed 4 No. of RWH pits of 37 cum each recharge capacity.

viii. The maximum height of the building is Basement + Stilt + 6 floors (18m above ground) The project complex will have traffic entry and exit from 12 m wide road on east and 24 m wide road on north east. Roads for internal circulation having width of about 7.5 m and 6 m will be provided within the complex for smooth circulation of the traffic. The entry/exit points have been marked on the layout plan. The project site is well connected to network of roads leading from various parts of the city.

ix. The project is proposed to have parking space of 203 vehicles.

Parking Space Available (4-Wheeler)

Area (sqm) Parking Provided

Basement Parking @ 35 m2 per ECS

3400 sqm (Excluding area for services)

97 ECS

Stilt Parking @ 30 m2 per ECS 2200 sqm (Excluding area for services)

73 ECS

Open Parking for EWS/LIG @ 25 m2 per ECS

825 sqm 33 ECS

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 6 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Total 6425 sqm 203 Vehicle Space

x. As per the National Building Code (NBC-2005), the basic minimum requirement for firefighting installation shall be provided for the proposed project. Firefighting measures shall be adopted as per NBC guidelines. Fire equipment as per NBC provisions have been installed in all multi units. Final inspection by the concerned authority for the same is under process.

Fire Fighting Designed: As per National Building Code (NBC) 2005.

Wet Riser System

Portable Fire Extinguisher

Sprinkler System

Automatic Sprinkler System in basement

Automatic Detection and Alarm System

Manually Operated Electric Fire Alarm System

Yard Hydrant (External Hydrant System)

Provision of fire escape staircase

External yard Hydrants in galvanized steel fire hose cabinet (weather-proof)

Fire Escape Staircases as per NBC requirements

Fire Fighting equipment will be divided into water & Foam based firefighting depending upon the nature of fire Sand buckets will be placed on each floor of the project.

xi. Total Green Area will be around 929.8m2 (10% of net plot area) will be used for landscaping.In this project, PP has proposed total 100 trees of native species under landscaping and plantation under guidance of forest and concerned department.

xii. The project development cost Rs. 1965.0 Lakhs has been estimated. The capital investment is estimated about Rs. 30.37 Lakhs and recurring cost is Rs 9.05 Lakhs under environment management plan.

xiii. PP has submitted the remediation plan and natural community resource augmentation plan corresponding to the ecological damage assessed and economic benefits derived due to violation in the tune of suggested guidelines by the committee and also analyze the cost of remediation in monitoring, soil management, RWH, additional plantation, OHS etc. PP submitted & presented the revised remediation & augmentation plan which is as follows:

S. No.

Environmental

Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost Remarks Factors/

Augmentation Plan

Attributes Capital Recurring Capital Recurring

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 7 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Cost

Cost Cost (INR) Cost (per

annum)

1

Land use as per Approved Master Plan by TNCP, Bhopal

Broken land is as per master plan approved by T&CP (enclosed land use area breakup & Undertaking as Annexure)

- - 19,65,88000

-- T & CP Letter No. 798/L.P. 049/29/NAGRANI/GKA/2012-13 Bhopal dated 17/04/2013

NO VIOLATION

Project Capital Cost

2

Environmental Sensitive Places, Land Acquisition Status, Resettlement & rehabilitation

Land is in possession of M/s Ayush Enterprises land revenue record

- - Land is in possession of M/s Ayush Enterprises. All land records is enclosed with our EC Application.

- -

No R & R Applicable

NO VIOLATION

3

Baseline Environmental Quality (2014-17)

All the parameters are in the comfort zone in one season EIA study

--

90,000

- - 30,000

We have done EIA study. All baseline data results are found satisfactory

Monitoring data from 2014-17 is pending @ 30000/ year * 3 Years (2 Air, 2 Noise, 1 water)

(amount may be proposed for plantation or as per the suggestions of SEAC/SEIAA)

4 A) Land

Total land area 10,687.57sq.mt & Built-Up Area-21864.23 Sq.mt.,

- -

Land is in possession of M/s Ayush Enterprises. All land records are enclosed with our EC Application.

- - No Violation Total quantity of topsoil has been used for the development of 929.8 sq.mt. of landscaping area.

B) Ground Water

No new ground bore well is done for construction purpose.

-- --

Not applicable, till date no bode well for ground water tapping is proposed.

-- -- NO VIOLATION

C) Surface water

Not applicable, No Water body exist within the project lease

-- -- Not applicable

-- -- NO VIOLATION

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 8 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. No.

Environmental

Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

area

D) Air

Water sprinkling had been done as per terms & condition of the work order agreements (1 water tankers/day)

2,00,000

0

Construction period = 4 years,

1,30,000 70,000.00

As per contract All bills submitting in hard copies to SEAC.

Working Day =600 day

(attached as Annexure)

Per day water requirement = 4 KLD (1 Tanker @ 100/ tanker water cost)

E) Biodiversity

NOT APPLICABLE

-- -- NOT APPLICABLE

--- --

We have not created any change in the biodiversity of the area.

f) Noise & Vibration

Site is fully barricaded; all modern and new machinery was used on site.)

1,50,000

0

Site Barricading material Sheet, Pipe & Fabrication

0 --

Bills submitted in hard copies. (attached as Annexure)

g) Socio economy & Health

- - - - - Done in EIA study

g.a. Occupational Health checkup for 30 Workers

Initial Medical Examination (IME) for 30 workers

1,00,000

50,000

Initial Medical Examination (IME) for 30 workers deployed on Site.

- 50,000

Total Calculated value for occupational health and check-up, PPE’s have been covered under remedial cost

Deployed on site.30X833X4)

(amount may be proposed for plantation or as per the suggestions of SEAC/SEIAA)

(833 Rs/workers) for a year.

g.b. Personal Protection Equipment’s

All PPE’s distribution to the laborers and staff are under contractor’s scope. 30X1670)

0

50,000.00 Helmet, Jackets, hand gloves & Boots will be Provide to 30 Workers for remaining 9% construction work.

50,000 0

(amount may be proposed for additional plantation or as per the suggestions of

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 9 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. No.

Environmental

Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

SEAC/SEIA)

g. c. Shelter and Sanitation for 30 workers

Temporary shelter & Mobile toilet has been provided to the workers

0 0

Provision of Temporary shelter &Mobile toilet will be extended in numbers during the time of construction for 30 workers

5,20,000 50,000 No Violation

5

Contour Plan With slopes, Drainage’s pattern of the site and surrounding area any obstruction of the same by the projects.

No conversion is done in storm water drainage pattern on site

- - -- - - No Violation

6 Tree Felling

-- No tree felling is proposed.

No tree felling is proposed.

7 Tree plantation

Total trees planted & development of landscaping area

2,25,000

0

All type of landscaping development& maintenance including tree cost

2,00,000 1,00,000

All landscaping & Plantation work have been completed

8 Permission for forest Land

NOT APPLICABLE

- - NOT APPLICABLE

- - No forest area is involved in this project.

9 Environment policy

Policy is part of Terms & Condition of mutual Agreement

- - - - -

Policy is part of Terms & Condition of mutual Agreement

10

Ground Water Classification

At construction phase no ground water has been used.

- -

At construction phase no ground water has been used,

-- -- No violation

11 Source of Water

A – Construction Phase

-- -- -- -- --

During Construction phase we have used Water Tanker supply.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 10 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. No.

Environmental

Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

B – Operational Phase

-- -- -- -- --

Water supply permission vide letter no. 749/S.Yantri/Jalkarya/Zone 13/2019 Bhopal dated 01/02/2019. (attached as Annexure)

12

Source of Waste Water Treatment

180 KLDSTP installed.

0 --

180 KLD– Rs.

12,42,000 1,35,000

Balance Sheet & Sample Bills are attached as Annexure. Installation in final stage.

1377000.00 for civil construction (Labor, Material& Maintenance Cost)

13 Dual Plumbing

Dual Plumbing for 91% of constructed area has been completed.

0 --

Dual Plumbing for 9% of construction yet to be done.

3,00,000 0

Balance Sheet & Sample Bills are attached as Annexure.

12 Rain Water Harvesting

4 No. Rain water harvesting pit of 37 cum. Each capacity has been constructed for the project.

1,50,000

--

Total 4 nos. of pits have been constructed on site for operational phase

50,000 0 --

13

Soil Characteristics & Ground Water Table

Total land area 10,687.57sq.mt., &Built Up Area - 21864.23 Sq.mt.,

-- --

4 m depth of rain water harvesting pits have been proposed,

-- -- NO VIOLATION Top Soil Conservation

Total quantity of topsoil has been used for the development of 929.8sq.mt. of landscaping area.

Quality of top soil & costing of its disposal

14

Solid Waste Generation Treatment

All the construction waste has been reused for the filling of the low-lying project area.

1,75,000

0

Solid Waste will be reused in proposed boundary wall & stone pitching to reduce RCC work on site

1,50,000 30,000

MSW NOC vide letter No. Q/SW.V./2019 dated 23/02/2019

(attached as Annexure)

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 11 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. No.

Environmental

Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

Permission for Disposal of Solid waste is being proposed from BMC

-- --

Street garbage shall be controlled segregated transferred, and disposed off by Nagar Nigam Bhopal.

-- --

15

Energy conservation & Energy Efficiency (LED bulb & Solar System along with MPEB connection and Transformer Installation )

LED Lights & other energy conservation

2,00,000

--

Provision for External Lighting including solar panels for streets lighting & common areas and LED light for commercial unit

1,50,000 65,000 We have proposed Solar Power.

16 D G Sets

Till date RMC has been used for constructionNo DG set have used for construction purpose.

- - - 1,50,000 1,00,000

We have not used DG set in our construction phase.

(RMC bills attached as Annexure)

17 Parking & Roads

Approach road already exists sufficient space for Parking

- -

Development of Open Parking& Other Services -

7,50,000 1,00,000

All adequate parking facilities have been provided as per T&CP norms.

18

Transportation of materials for construction

Till date 91% construction have been done.

--

50,000.00 Storage hall/service yard will be for materials stacking during further 9% construction.

0 50,000

Some miscellaneous transportation work had not been done in appropriate manner. We are proposing some rounded amount in our remediation cost.

(amount may be proposed for plantation or as per the suggestions of SEAC/SEIAA)

19 Disaster Management Plan

- - -

Centralized control room with ERP system

-- -- --

a) Fire

Machines were equipped with their fire extinguishing

4,00,000

50,000

Firefighting organizing and arrangement: External

1,30,000 50,000

All fire & safety facilities &Fire Tender Movement have been provided

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 12 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. No.

Environmental

Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

equipments. Till date we have proposed fire provisions for our B+S+6 floors Residential Block which is under process.

fire hydrant system, hose pipes, pumps with control panel, overhead tanks, first aid, fire extinguishers, sand buckets, Manual and automatic fire alarm, main security room etc.

for our 1 No. B+S+6 Residential Block & entire project area.

b) Accidental & First aid etc.

First aid kit & room provided on site, enclosed photos

-- 25,000

First aid kit for worker’s safety on site

-- 25,000 No accident or injury is reported during the earlier construction period

c) Safety

All loading machines, dumpers &Equipments will be deployed as per safety norms mentioned in Agreement.

0 50,000.00

All loading machines, dumpers &Equipments will be deployed as per safety norms mentioned in Agreement.

0 50,000.00 -

16,00,000

3,65,000 -- 38.22,000 9,05,000.00

Total Capital cost for Remedial Plan

Say 16.00 Lakhs

Total capital cost for EMP

Say 38.22 Lakhs

Total recurring cost for Remedial Plan

Say 3.65 Lakhs

Total Recurring Cost for EMP

Say 9.05 Lakhs

Total Remediation Budget 19.65Lakhs

xiv. PP has proposed Rs. 896.82 Lakh (Rs. 19.65 Lakh as Remediation Cost and Rs. 39.42 Lakhs as EMP & 837.75 Lakh Rs. For construction work) for this project. Vide letter dtd. 08.04.2021 PP has submitted bank gurantee (BG) with three years validity of Rs. 19.65 Lakhs (equivalent to amount proposed in remediation and resource augmentation plan) which can be deposited in M.P. Pollution Control Board, Bhopal.

xv. PP has submitted remediation expenditure as follows:-

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 13 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. No.

Particulars/ Bills Expenses Done till Date (2017)

Remediation Budget

T&CP Issued date 17.04.2013

1 Tanker Water supply ₹ 2,00,000 ₹ 2,00,000

2 Road Construction ₹ 7,50,000 ₹ -

3 Landscape Work ₹ 2,25,000 ₹ 3,00,000

4 Solid Waste Disposal ₹ - ₹ 1,75,000

5 Dual Plumbing ₹ 3,00,000 ₹ -

6 Shelter and Sanitation facility of Construction phase

₹ 7,10,000 ₹ -

7 RMC/ All building and other construction work including material

₹ 8,20,00,000

₹ -

8 Fire Fighting Equipment ₹ 1,30,000 ₹ 4,00,000

9 Pavers Block ₹ 1,20,000 ₹ -

10 MPEB Temporary Bill ₹ 5,50,000 ₹ -

11 Fly Ash Bricks ₹ - ₹ 4,00,000

12 STP Work ₹ 13,77,000 ₹ -

13 Rainwater Harvesting & Storm Water Drainage ₹ 50,000 ₹ 1,50,000

14 Personal Protective Equipment (Helmet, Shoes, Safety belts etc.)

₹ 50,000 ₹ 50,000

15 First Aid Box ₹ 5,000 ₹ -

16 Health Check-up of Workers ₹ 1,00,000 ₹ -

17 Site Barricading with GI Sheet ₹ 1,50,000 ₹ -

18 LED Lights & other energy conservation ₹ 5,00,000 ₹ 2,00,000

19 DG set ₹ 5,00,000 ₹ -

20 Environmental Monitoring @ 30,000 per year ₹ - ₹ 90,000

Total ₹ 8,77,17,000

₹ 19,65,000

xvi. As per MoEF&CC OM F.No.22-65/2017-IA.III dated 25th Feb2021, the project proponent will be bound to take up all activities proposed by them in the EMP as well as any additional activities that may either committed by them before the SEIAAs/SEACs. As such for the proposed project cost is Rs. 19.65 Crores and proposed Rs. 6.50 lakh against CER budget along with our EMP budget 30.37 Lakhs.

xvii. The primary beneficiaries of CER shall be people living within the radius of 10.0 km of the proposed project. The proponent has allocated a budget for carrying out socio-economic welfare activities as mentioned above. The amount earmarked in the budget will be separately kept and will not be used for any other purposed. The budget may be increased as per the actual requirement during the implementation stage.

Corporate Environment Responsibility (CER) Budget CER activities as per notifications Proposed Budget for CER Infrastructure creation for drinking water supply, sanitation, health, education,

Schools & Colleges of adjacent villages (Gudari Ghat– 4.59 Km (SW) & Kodi – 5.89 Km (S)).

Proposed Rs. 6.50 lakh against CER budget.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 14 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

skill development, Maintenance of roads, electrification including solar power, avenue plantation etc. Drinking water & sanitation facilities

Nearby Aanganwadi Centres

The submissions made by the PP were found to be satisfactory and acceptable hence it is decided to accept the recommendations of 498th SEAC meeting dtd. 06.04.21with special conditions and accord Environmental Clearance for Construction of Group Housing Project "Sagar Eden Garden " at Khasra No. 447, 449/1, 447,449/2, 447,449/3, 449/1/1 at Village-Bawadiya Kalan, Tehsil- Huzur, District- Bhopal, M. P. Total Project area - 10687.51 sq.m.(1.07 ha) Total Built up Area- 21,864.23 sq.m. by Partner, MS AYUSH ENTERPRISES Sagar Plaza, 250, zone 2 MP Nagar Bhopal, M.P. 462016, subject to following specific conditions imposed by SEIAA:-

1. The entire demand of water should be met through Municipal Corporation, Bhopal, there should be no extraction of ground water.

2. The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.

3. Disposal of waste water.

a. PP should ensure disposal of waste water arrangement should be done in such a manner that water supply sources are not impaired.

b. PP should ensure linkage with municipal sewer line for disposal of extra treated waste water.

c. The project not having provision for discharge of excess treated sewage cannot permit to start operation unless proper arrangements are put in place for its safe handling.

4. Solid Waste Management:

a. Ensure linkage with Municipal Corporation for final disposal of MSW.

b. Adequate measures should be taken to prevent odour emanating from solid waste handling & processing.

5. PP should ensure building height,road width, front MOS and side / rear as per approved layout of T & CP.

6. For firefighting:-

a. PP should ensure distance of fire station approachable from the project site.

b. As per MPBVR, 2012 rule 42 (3) PP should submit necessary drawings and details to the Authority (Nagar Nigam,Bhopal) incorporating all the fire fighting measures recommended in National Building Code 2005.The occupancy permit shall be issued by Nagar Nigam only after ensuring that all fire fighting measures are physically in place. (as per NOC dtd. 05.12.15

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 15 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

7. For Rain Water Harvesting, and Storm water management:-

a. PP should ensure the rain water harvesting with 4 No. of RWH pits of 37 cum recharging pits and these pits should be connected laterally to consume the surplus runoff. In addition, PP should provide recharging trenches. The base of the trenches should be Kachha with pebbles.

b. The storm water from roof – top, paved surfaces and landscaped surfaces should be properly channelized to the rain water harvesting sumps through efficient storm water network as proposed. The budget should be included in EMP plan for storm water management.

8. PP should ensure to provide car parking total 203 ECS (Basement- 97 ECS, stilt parking-73 ECS and open parking- 33 ECS).PP should explore the possibility to increase the no. of parking and parking area will be not diverted for other purpose.

9. Green belt :-

a. PP should ensure plantation in an area of, 929.8m2 (10% of net plot area) of area is dedicated for the green belt development by Planting 100 numbers of trees. Peripheral plantation is present along the project boundary with approx. 185 plants.

b. As a green belt and landscaped area with regular maintaenance and also explore the possibility to plant trees of indigenous local varieties like Neem, Peepal, Kadam, Karanj, Kachnaar, Saltree, Gulmohar etc.

c. The green belt of the adequate width and density preferably with local species along the periphery of the plot shall be raised if possible so as to provide protection against particulates and noise.

d. PP should explore the possibility to increase the plantation area by planting additional trees adjacent to the project area.

10. PP should ensure to complete the activities listed under ecological remediation, Natural resource augmentation & community resource augmentation for a total amount of Rs. 19.65 Lakh.

11. The amount specified as CER Rs. 8.0 lacs used only for the proposed activities and not diverted for other purposes.

12. PP shall carry out the works assigned under ecological damage, natural resource augmentation and community resource augmentation within a period of six months and submitted to same in MPSEIAA.

13. PP should ensure to submit half yearly compliance report and CER activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 16 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

2. Case No 8364/2021 : Environmental clearance for Construction of - Residential Plotted development project " KOUSHALYA PINK HERITAGE " at Village Semara 141, 142/1, 215/1 Village Hinotia Kachchiyan 35, 36-94/37/2ka, 41/2/2, 42/1/2ka, 47, 44 and 45-46/1, Bhopal M. P. Total Project area - - 97518.90 sq.mt. Total Built Up Area - 81928.47 sq.mt. Proposed built up area 19680.38 sqm (1st phase) by M/s Koushalya Devi Builders and Developers through Shri Balwant Singh Partner 51, Premier House Zone-II, MP Nagar, Bhopal(MP)- 462016 Email: [email protected] Mob: +91 922 933 7135 Envt. Consultant:In Situ Enviro Care

1. The proposed Group Housing Project is located at Villages Semrakalan & Hinotia Kachchiyan, Tehsil Hazur, District Bhopal of Madhya Pradesh State. Proposed land for construction of group housing project is spread over 81,928.47 m2 and is permitted for residential use as per Bhopal Development Authority, master Plan 2005.

2. The project includes Plotted Development, EWS Units, Apartments, Convenient Shopping, Community Centre Dispensary School.

3. The Co-ordinates of the project site are latitude from latitude 23°15'57.0"N and longitude 77°25'38.0"E. The proposed project is covered in toposheet no.-F43F7, Survey of India (SOI).

4. As per the T & CP approval (T & CP Letter No. 116/L.P. 231/ 29/ GKA/ Na. Gra. Ni./ 2008 dated 04/12/2008) the total land area of 97,518.90 m2 (9.7518 ha) with built-up area of 81,928.47 sq.m. The project is categorized as 'B-2' under item 8 (a) of Schedule-Gazette Notification dated Sep 14th, 2006 and subsequent amendments issued by MoEF, New Delhi on 01.12.09 and 04.04.2011 because total construction is between 20,000 sq.mt. & 1, 50,000 sqmt. and plot area is less than 50 ha.However as the present project is a violation project, it was required to prepare an EIA Report.

5. Construction work has been completed till 11% of built-up area owing to unawareness of the EIA Notification and its amendments and falls under the purview of the EIA Gazette Notification dated 08.03.2018, amending the Notification dated 14th March 2017. This report has been prepared in compliance to Gazette Notification dated 08.03.2018, amending the Notification dated 14th March 2017 including assessment on ecological damage, remediation plan and natural and community resource augmentation plan.

6. As this is a violation case as 11.36% of construction work has been completed without getting prior environment clearance. The proposed project is a part of Bhopal Municipal Corporation (BMC) and all the facilities are available for the proposed project. It is stated that the baseline monitoring data has been collected for the season of Winter Season, 2020-2021 i.e. December 2020 to February 2021.

Total Built-up Area 81928.47 sqm (100%) Till date constructed Built-up Area 9315.01 sqm (11.36 %)

Construction to be done 72613.46 sqm (88.64%)

7. The case was presented by the PP and their consultant in the 492nd SEAC dated 19/03/2021 wherein it was observed that this is a violation project and about 70%

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 17 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

occupation has been completed and PP has applied for TOR in the window period provided by MoEF&CC vide Notification dated 09/Sep/2019.

8. Van Vihar National Park is 6.5 km in SW direction from the project site.

9. The application of ToR was presented before SEAC on 492nd dated 19.03.2021,.The ToR was granted by the SEIAA dated 30th March, 2021. PP has submitted the EIA report vide letter dated 30/3/2021 which was forwarded to SEAC vide letter no. 45 dated 01/4/2021, which was placed before the committee.

10. The case was discussed in SEAC 498th meeting dtd. 06.04.21, and recommended the EC subject to the special conditions and submission of bank gurantee (BG) with three years validity of Rs.. 18.65 Lakh (equivalent to amount proposed in remediation and resource augmentation plan) with the MP Pollution control Board.

13. After the recommendation of SEAC today the case was scheduled for presentation and after deliberation the case was discussed in detail and recorded that:-

i. Regarding land documents PP has submitted Khasra Panchsala 2013-14. As per the land documents the landownership is the name of Shri Narendra Singh & Shri Santok Singh S/o Shri Machhi Singh and Rajdhani Land & Housing Corporation Prop. Shri Machhi Singh. PP has also submitted agreement of partnership executed on dtd. 01.01.2006 between all land owners.

ii. The total quantity of water requirement for the proposed group housing project is 380.0 KLD of which 342 KLD which will be met from Bhopal Municipal supply. PP has submitted copy of application dtd 16.03.21 applied to Municipal Corporation, Bhopal for water supply.

iii. The waste water 324 KLD will be generated, which will be treated in the MBBR based STP of 350 KLD (100 KLD & 250 KLD). Two STP are being proposed with the capacity of 100 KLD for phase and 250 KLD for second phase for the project. Extra treated water of 40 KLD will be drained to sewer line of BMC and required permission has been obtained from BMC. PP has submitted letter dtd. 04.03.21 issued by Municipal Corporation, Bhopal for disposal of extra treated waste water.

iv. The solid waste generated from project will be mainly domestic in nature and the quantity of the waste will be 1.258 TPD (0.692 TPD Biodegradable and 0.566 TPD Non-biodegradable).These all type of waste shall be treated/ disposed off as per provision made in the MSW Rules 2016.The biodegradable portion of MSW will be treated at site by 1 Organic Waste Converter of 1000 kg per day capacity and manure generated will be used for plantation. The non-biodegradable fraction like plastic, tin, glass etc. will be sold to local recyclers. Horticultural waste shall be collected and disposed-off with biodegradable waste. Rest inert MSW will be handed over to Municipal Corporation for final disposal. PP has submitted copy of application dtd. 22.01.21 to Municipal Corporation, Bhopal for disposal of solid waste.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 18 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

v. Total power requirement is 1200 KW through 11 KV MPSEB supply feeder. Average Energy consumption is assumed as 50 Watt per sq.m of built-up area. To minimize energy consumption timer control circuits for common area, parking, outdoor lights with energy efficient CFL & LED lamps shall be proposed.

vi. PP has proposed to have dedicated 7 nos. of 11 KV/0.433 KV, 315 KVA Transformer near each block to be installed to reduce line transmission losses. The state Govt. Is committed to 24-hour power supply, no DG sets are proposed in the campus. In case of electricity board power supply failure due to maintenance or other causes DG set on hire shall be placed, in such case power to STP and necessary water supply system shall be transferred to the TL panel through AMF panel installed with the DG set.

S. No. Description Factor Load

1 Built-up Area 53805.93 50 Watt/sqm 2690.29 KW

2 Common Areas for 479 dwelling units

0.5 kw/dwelling 239.5 KW

3 Total Demand 2929.79 KW

4 Load in KVA 0.8 36622.24 KVA

5 Transformer Loading

65% 2380.4 KVA (2.38 MVA)

6 As the load is between 1 to 2.5 MVA a dedicated 11 KV feeder will be preferred.

vii. The following energy conservation plan and measures will be implemented.

Passive solar refers to the use of Sun’s energy for the heating and cooling of living spaces.

The orientation of the building has been done in such a way that maximum daylight is available.

The orientation of the building will be done in such manner that most of grazed areas will face north and east.

Lesser opening will be provided on the west facing walls.

Landscape and greens areas will be so spaced to cool the surrounding environment, which will reduce energy consumption.

Greenbelt in the site will be maintained by the project proponents, which would have an overall cooling effect on the surroundings.

Using electronic ballast for discharge lamps.

Use of Solar backed LED landscape lights instead of par lamps.

Solar lighting installation is proposed, it will cover approx. 30% of total common lighting. In this project, all energy saving equipments installed with star ratings. LED lights have been used in entire project.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 19 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

viii. The storm water collection system for the common areas of the proposed project like parks, roads, pavements, etc. will be provided by project proponent. The amount of run-off depends upon many factors such as intensity and duration of precipitation, characteristics of the tributary area and the time required for such flow to reach the drains. The drains shall be located near the carriage way along either side of the roads. Taking the advantage of road camber, the rainfall run off from roads shall flow towards the drain.

ix. After the completion of the project and rainwater harvesting structures, there will be total ground water recharge would be 44,422.48 m3/annual. Proposed recharge potential to be created by the project would improve ground water regime of the area and would contribute to positive ground water environment. We have proposed 11 nos. pits of 12.0 m3 each recharging capacity which are proposed for artificial ground water recharge from common areas of the Scheme.

x. Proposed Project. The total maximum height of the project will be about 18.0 m+2 Basements. The project complex will have traffic entry and exit from 12 m wide road. Roads for internal circulation having width of about 7.5 m and 6 m will be provided within the complex for smooth circulation of the traffic. The entry/exit points have been marked on the layout plan. The project site is well connected to network of roads leading from various parts of the city.

xi. Since the scheme is potted development the dwelling unit on the plot shall have its own parking space. The details of parking facilities required as per norms and as proposed within the propped project.

Occupancy Nett Built-up Area*

PCU/sqm PCU Parking

Podium Basement Open Apartments 17187.83 100 172 172

Convenient Shopping

4669.22 50 94 44 40

Community Centre

853.91 75 12 12

Dispensary 809.01 75 11 11

School 862.26 75 12 12

Total 291 ECS

xii. As per the National Building Code (NBC-2005), the basic minimum requirement for fire fighting installation shall be provided for the proposed project. Fire fighting measures shall be adopted as per NBC guidelines. Fire equipment as per NBC provisions have been installed in all multi units. Final inspection by the concerned authority for the same is under process.

Fire Fighting Designed: As per National Building Code (NBC) 2005.

Wet Riser System

Portable Fire Extinguisher

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 20 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Sprinkler System

Automatic Sprinkler System in basement

Automatic Detection and Alarm System

Manually Operated Electric Fire Alarm System

Yard Hydrant (External Hydrant System)

Provision of fire escape staircase

External yard Hydrants in galvanized steel fire hose cabinet (weather-proof)

Fire Escape Staircases as per NBC requirements

Fire Fighting equipment will be divided into water & Foam based firefighting depending upon the nature of fire Sand buckets will be placed on each floor of the project.

xiii. Total Green Area will be around 8,361.98 m2 (10.36% of net plot area) will be used for landscaping.In this project, PP has proposed total 500 trees of native species under landscaping and plantation.

xiv. The project development cost Rs. 1976.65 Lakhs has been estimated. The capital investment is estimated about Rs. 649.00 Lakhs and recurring cost is Rs. 14.93 Lakhs under environment management plan.

xv. PP has submitted the remediation plan and natural community resource augmentation plan corresponding to the ecological damage assessed and economic benefits derived due to violation in the tune of suggested guidelines by the committee and also analyze the cost of remediation in monitoring, soil management, RWH, additional plantation, OHS etc. PP submitted & presented the revised remediation & augmentation plan which is as follows:

S.

No

.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes Capita

l Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

1

Land use as per Approved Master Plan by TNCP, Bhopal

Broken land is as per master plan approved by T&CP (enclosed land use area breakup & Undertaking as Annexure)

- - 19,76,65,000

--

T & CP Letter No. 116/L.P. 231/29/GKA/Na.Gra.Ni./2008 dated 04/12/2008

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 21 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

NO VIOLATION

Project Capital Cost

2

Environmental Sensitive Places, Land Acquisition Status, Resettlement & rehabilitation

Land is in possession of Koushalya Devi Builders and Developers land revenue record

- -

Land is in possession of Koushalya Devi Builders and Developers. All land records isenclosed with our EC Application.

- -

No R & R Applicable NO VIOLATION

3

Baseline Environmentality (2010-17)

All the parameters are in the comfort zone in one season EIA study

--

2,10,000.00

- - 30,000 All baseline data results are found satisfactory

Monitoring data from 2010-17 is pending @ 30000/ year * 7 Years (2 Air, 2 Noise, 1 water)

(amount may be proposed for plantation or as per the suggestions of SEAC/SEIAA)

4 A) Land

Total land area 97,518.90 sq.mt., & Built-Up Area - 81,928.47 Sq.mt.,

- -

Land is in possession of Koushalya Devi Builders and Developers. All land records are enclosed with our EC Application.

- - No Violation Total quantity of topsoil has been used for the development of 8,361.98 sq.mt. of landscaping area.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 22 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

B) Ground Water

No new ground bore well is done for construction purpose.

-- --

Not applicable, till date no bode well for ground water tapping is proposed.

-- -- NO VIOLATION

C) Surface water

Not applicable, No Water body exist within the project lease area

-- -- Not applicable

-- -- NO VIOLATION

D) Air

Water sprinkling had been done as per terms & condition of the work order agreements (2 water tankers/day)

50,000 50,000

Construction period = 7 years,

9,80,000 3,00.000

As per contract All bills submitting in hard copies to SEAC.

Working Day = 700 day

(attached as Annexure)

Per day water requirement = 8 KLD (2 Tanker @ 100/ tanker water cost)

E) Biodiversity

NOT APPLICABLE

-- -- NOT APPLICABLE

--- --

We have not created any change in the biodiversity of the area.

f) Noise & Vibration

Site is fully barricaded; all modern and new machinery was used on site.)

-- 50,000

Site Barricading material Sheet, Pipe & Fabrication

2,00,000 --

Bills submitted in hard copies. (attached as Annexure)

g) Socio economy & Health

- - - - - Done in EIA study

g.a. Occupational Health checkup for 150 Workers

Initial Medical Examination (IME) for 150 workers

--

50,000

Initial Medical Examination (IME) for 150 workers deployed on Site.

- 1,20,000

Total Calculated value for occupational health and check-up, PPE’s have been covered under remedial cost

Deployed on site.30X800X5)

(amount may be proposed for plantation or as per the suggestions of SEAC/SEI

(800 Rs/workers) for a year.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 23 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

AA)

g.b. Personal Protection Equipment’s

All PPE’s distribution to the laborers and staff are under contractor’s scope. 150X1200)

1,80,000.00

Helmet, Jackets, hand gloves & Boots will be Provide to 150 Workers for remaining 88.64% construction work.

1,80,000 18,000

(amount may be proposed for additional plantation or as per the suggestions of SEAC/SEIAA)

g. c. Shelter and Sanitation for 30 workers

Temporary shelter & Mobile toilet has been provided to the workers

-- 50,000

Provision of Temporary shelter &Mobile toilet will be extended in numbers during the time of construction for 30 workers

50,000 - No Violation

5

Contour Plan With slopes, Drainage’s pattern of the site and surrounding area any obstruction of the same by the projects.

No conversion is done in storm water drainage pattern on site

- - -- - - No Violation

6 Tree Felling -- No tree felling is proposed.

No tree felling is proposed.

7 Tree plantation

Total trees planted & development of landscaping area

2,00,000

0

All type of landscaping development& maintenance including tree cost

4,00,000 2,50,000

All landscaping & Plantation work have been completed

8Permission for forest Land

NOT APPLICABLE

- - NOT APPLICABLE - -

No forest area is involved in this project.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 24 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

9Environment policy

Policy is part of Terms & Condition of mutual Agreement

- - - - -

Policy is part of Terms & Condition of mutual Agreement

10

Ground Water Classification

At construction phase no ground water has been used.

- -

At construction phase no ground water has been used,

-- -- No violation

11

Source of Water

A – Construction Phase

-- -- -- -- --

During Construction phase we have used Water Tanker supply.

B – Operational Phase

-- -- -- -- --

Water supply permission vide letter no. 2/S.Yantri/Jalkarya/Zone 17/N.Ni. Bhopal dated 29/07/2020. (attached as Annexure)

12

Source of Waste Water Treatment

350 KLD (250 + 100 KLD) STP installed.

0 --

350 KLD (250 + 100 KLD) – Rs.

40,00,000 3,00,000

Balance Sheet & Sample Bills are attached as Annexure. Installation in final stage.

1800000.00 for civil construction (Labor & Material Cost)

13

Dual Plumbing

Dual Plumbing for 11.36% of constructed area has been completed.

2,00,000

--

Dual Plumbing for 91% of construction yet to be done.

22,50,000

1,50,000

Balance Sheet & Sample Bills are attached as Annexure.

12

Rain Water Harvesting

11 No. Rain water harvesting pit of 12 cum. Each capacity has been constructed for the project.

2,00,000 --

Total 11 nos. of pits have been constructed on site for operational phase

6,39,291 50,000 --

13

Soil Characteristics & Ground Water Table

Total land area 97,518.90 sq.mt., &Built Up

-- --

4 m depth of rain water harvesting pits have been

-- -- NO VIOLATION

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 25 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

Area - 81,928.47 Sq.mt.,

proposed,

Top Soil Conservation

Total quantity of topsoil has been used for the development of 8,361.98 sq.mt. of landscaping area.

Quality of top soil & costing of its disposal

14

Solid Waste Generation Treatment

All the construction waste has been reused for the filling of the low-lying project area.

-- 50,000

Solid Waste will be reused in proposed boundary wall & stone pitching to reduce RCC work on site

18,50,000

--

MSW application is attached with hard copy reply. Vide letter dated 22/01/2021 (attached as Annexure)

Permission for Disposal of Solid waste is being proposed from BMC

-- --

Street garbage shall be controlled segregated transferred, and disposed off by Nagar Nigam Bhopal.

-- --

15

Energy conservation & Energy Efficiency (LED bulb & Solar System along with MPEB connection and Transformer Installation )

LED Lights & other energy conservation

2,00,000

--

Provision for External Lighting including solar panels for streets lighting & common areas and LED light for commercial unit

1,09,90,461

1,00,000 We have proposed Solar Power.

16

D G Sets

Till date RMC has been used for construction No DG set have used for construction purpose.

- - - 3,76,77,983

0

We have not used DG set in our construction phase.

(RMC bills attached as Annexure)

17

Parking & Roads Approach road

- - Development of Open

52,83,218

50,000 All adequate parking facilities

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 26 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

already exists sufficient space for Parking

Parking& Other Services -

have been provided as per T&CP norms.

18

Transportation of materials for construction

Till date 11.36% construction have been done.

--

50,000.00

Storage hall/service yard will be for materials stacking during further 10% construction.

1,00,000 50,000

Some miscellaneous transportation work had not been done in appropriate manner. We are proposing some rounded amount in our remediation cost.

(amount may be proposed for plantation or as per the suggestions of SEAC/SEIAA)

19

Disaster Management Plan

- - -

Centralized control room with ERP system

-- -- --

a) Fire

Machines were equipped with their fire extinguishing equipments. Till date we have proposed fire provisions for our 1 No. G+6 Residential Block which is under process.

-- 50,000

Firefighting organizing and arrangement: External fire hydrant system, hose pipes, pumps with control panel, overhead tanks, first aid, fire extinguishers, sand buckets, Manual and automatic fire alarm, main security room etc.

3,00,000 50,000

All fire & safety facilities & Fire Tender Movement have been provided for our 1 No. G+5 Residential Block & entire project area.

b) Accidental & First aid etc.

First aid kit & room provided on site, enclosed photos

-- 25,000 First aid kit for worker’s safety on site

-- 25,000 No accident or injury is reported during the earlier construction period

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 27 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

S. N

o.

Environmental Remedial Plan/

Remedial Cost Environmental Management Plan

EMP Cost

Remarks

Factors/ Augmentation Plan

Attributes

Capital Cost

Recurring Capital Cost (INR)

Recurring

Cost Cost (per annum)

c) Safety

All loading machines, dumpers &Equipments will be deployed as per safety norms mentioned in Agreement.

50,000.00

-

All loading machines, dumpers &Equipments will be deployed as per safety norms mentioned in Agreement.

-- -- -

11,00,

000 7,65,000 -- 6,49,00,9

53 14,93,000.00

Total Capital cost for Remedial Plan

Say 11.00 Lakhs

Total capital cost for EMP

Say 649.00 Lakhs

Total recurring cost for Remedial Plan

Say 7.65 Lakhs

Total Recurring Cost for EMP

Say 14.93 Lakhs

xvi. PP has proposed Rs. Rs. 682.58 Lakh (Rs. 18.65 Lakh as Remediation Cost and Rs. 663.93 Lakhs as EMP) for this project. Vide letter dtd. 08.04.2021 PP has submitted bank gurantee (BG) with three years validity of Rs. 18.65 Lakhs (equivalent to amount proposed in remediation and resource augmentation plan) which can be deposited in M.P. Pollution Control Board, Bhopal.

xvii. As per MoEF&CC OM F.No.22-65/2017-IA.III dated 25th Feb2021, the project proponent will be bound to take up all activities proposed by them in the EMP as well as any additional activities that may either committed by them before the SEIAAs/SEACs. The primary beneficiaries of CER shall be people living within the radius of 10.0 km of the proposed project. The proponent has allocated a budget for carrying out socio-economic welfare activities as mentioned above. The amount earmarked in the budget will be separately kept and will not be used for any other purposed. The budget may be increased as per the actual requirement during the implementation stage.

Corporate Environment Responsibility (CER) Budget CER activities as per notifications Proposed Budget for CER Infrastructure creation for drinking water supply, sanitation, health, education, skill development, Maintenance of roads, electrification including solar power, avenue plantation etc.

Schools & Colleges of adjacent villages (Guradiya – 7.94 Km (NW) & Taraisewaniya – 7.89 Km (NW). Proposed Rs. 10.0 lakh against

CER budget.

Drinking water & sanitation facilities

Nearby Aanganwadi Centres

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 28 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Project Benefit: The project would provide positive benefits such as employment for a significant number of persons, many of whom will be employed from the residing community as well as surrounding area. Additionally, the cumulative effects of this type of development would result in noticeable economic benefits for the area. The proposed project will also make a positive contribution to social infrastructure and over all residential development.

The submissions made by the PP were found to be satisfactory and acceptable hence it is decided to accept the recommendations of 498th SEAC meeting dtd. 06.04.21with special conditions and accord Environmental Clearance for Construction of - Residential Plotted development project " KOUSHALYA PINK HERITAGE " at Village Semara 141, 142/1, 215/1 Village Hinotia Kachchiyan 35, 36-94/37/2ka, 41/2/2, 42/1/2ka, 47, 44 and 45-46/1, Bhopal M. P. Total Project area - - 97518.90 sq.mt. Total Built Up Area - 81928.47 sq.mt. Proposed built up area 19680.38 sqm (1st phase) by M/s Koushalya Devi Builders and Developers through Shri Balwant Singh Partner 51, Premier House Zone-II, MP Nagar, Bhopal(MP)- 462016, subject to following specific conditions imposed by SEIAA:-

1. The entire demand of water should be met through Municipal Corporation, Bhopal, there should be no extraction of ground water.

2. The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.

3. Disposal of waste water.

a. PP should ensure disposal of waste water arrangement should be done in such a manner that water supply sources are not impaired.

b. PP should ensure linkage with municipal sewer line for disposal of extra treated waste water.

c. The project not having provision for discharge of excess treated sewage cannot permit to start operation unless proper arrangements are put in place for its safe handling.

4. Solid Waste Management:

a. Ensure linkage with Municipal Corporation for final disposal of MSW.

b. Adequate measures should be taken to prevent odour emanating from solid waste handling & processing.

5. PP should ensure building height, road width, front MOS and side / rear as per approved layout of T & CP.

6. For firefighting:-

a. PP should ensure distance of fire station approachable from the project site.

b. As per MPBVR, 2012 rule 42 (3) PP should submit necessary drawings and details to the Authority (Nagar Nigam,Bhopal) incorporating all the fire fighting

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 29 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

measures recommended in National Building Code 2005.The occupancy permit shall be issued by Nagar Nigam only after ensuring that all fire fighting measures are physically in place.

7. For Rain Water Harvesting, and Storm water management:-

a. PP should ensure the rain water harvesting with 11 No. of RWH pits of 37 cum recharging pits and these pits should be connected laterally to consume the surplus runoff. In addition, PP should provide recharging trenches. The base of the trenches should be Kachha with pebbles.

b. The storm water from roof – top, paved surfaces and landscaped surfaces should be properly channelized to the rain water harvesting sumps through efficient storm water network as proposed. The budget should be included in EMP plan for storm water management.

8. PP should ensure to provide Individual parking for respective plot and car parking 291 ECS (Podium- 172 ECS for apartment, Basement- 44 ECS for convenient Shops and open parking- 75 ECS for shops, community center, dispensary and school).PP should explore the possibility to increase the number of parking in open area and parking area will be not diverted for other purpose.

9. Green belt :-

a. PP should ensure plantation in an area of, 8361.98 sq.m (10.36 % of Net plot area) of area is dedicated for the green belt development by Planting 500 numbers of trees.

b. As a green belt and landscaped area with regular maintaenance and also explore the possibility to plant trees of indigenous local varieties like Neem, Peepal, Kadam, Karanj, Kachnaar, Saltree, Gulmohar etc.

c. The green belt of the adequate width and density preferably with local species along the periphery of the plot shall be raised if possible so as to provide protection against particulates and noise.

d. PP should explore the possibility to increase the plantation area by planting additional trees adjacent to the project area.

10. PP should ensure to complete the activities listed under ecological remediation, Natural resource augmentation & community resource augmentation for a total amount of Rs. 18.65 Lakh.

11. The amount specified as CER Rs. 10.0 lakhs used only for the proposed activities and not diverted for other purposes.

12. PP shall carry out the works assigned under ecological damage, natural resource augmentation and community resource augmentation within a period of six months and submitted to same in MPSEIAA.

13. PP should ensure to submit half yearly compliance report and CER activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI, Bhopal) than prior

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 30 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

3. Case No 6878/2020, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.00 ha. for production capacity of 5000 cum per annum at Khasra No. 860/1/KA/1 at Village - Chormari, Tehsil - Rampur Baghelan, Dist. - Satna (MP) Shri Atul Singh Tiwari, Village - Chormari, Tehsil - Rampur Baghelan, Dist.- Satna (MP).

(1) This is a project pertaining to mining of Stone Quarry in MLA of 2.00 ha. The activity is mentioned at S.No. 1 (a) of the Schedule of EIA Notification 2006 as amended from time to time. The project is reported to be at a distance of more than 10 km from National Park /Sanctuary etc. thus it is not attracted by the general conditions by virtue of its location and mining lease area. There is a forest boundary within 250 m distance from the ML area. The committee constituted under the Chairmanship of Divisional Commissioner has given the permission on the condition that the chainlink fencing shall be carried out towards the forest area. The case was forwarded by SEIAA to SEAC for appraisal of EIA for environmental clearance for the project. It was submitted that this is a fresh grant issued in the year of 2018 for 10 years.

(2) The mining lease was granted to Shri Atul Singh Tiwari, Village - Chormari, Tehsil - Rampur Baghelan, Dist.- Satna in the year 2018 for 10 years, which is applicable after the execution of lease agreement. This is a case of fresh grant. The Mining Plan with progressive mine closure plan has been approved by D (G&M), Regional Office, Rewa vide Letter No. – 1135/M.P./Na.Kra./ 2018 rewa dated 04.07.2018.

(3) SEAC in its 498th SEAC meeting dtd. 06.04.2021 has recommended the case with 36 special conditions for issuance of EC.

(4) It was noted that as per DFO L.No. 1241 Singrauli, dtd. 26.12.2019, the National Park /Sanctuary is not located within 10 Km. radius from the mining site. Hence, the General Conditions are not attracted. The forest boundary is falling within 250 m distance from the ML area. However, the committee constituted under the Chairmanship of Divisional Commissioner has given the permission on the condition that the chainlink fencing shall be carried out towards the forest area.

(5) PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail.

(6) It was noted that the water requirement is 9.497 (say 9.50) KLD (0.150 KLD for Domestic use/ Drinking + 6.75 KLD for Dust suppression + 2.597 KLD for Green Belt). The water requirement will be met through tankers from nearby villages and mine pit water.

(7) The proposed plantation programme was examined and it was found that plantation of 600 tree saplings per year for next 05 years shall be covered under the plantation program.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 31 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

(8) It was also noted that the Public Hearing was carried out on 13.01.2021 at mine site at Village - Chormari, Tehsil - Rampur Baghelan, Dist. - Satna (MP) under the Chairmanship of Additional Collector, Satna.

After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. Lease agreement shall be carried out before execution of mining operation.

III. Plantation programme as mentioned in EIA/EMP and presented during presentation in SEIAA & SEAC shall be followed in content and spirit.

IV. PP shall demarcate a barrier zone of 7.5 m as no mining zone in the periphery of mining lease area and develop a green belt. Three rows plantation shall be carried out in the greenbelt area in the current year with proper watering arrangement.

V. PP shall ensure to construct chain link fencing on ML boundary towards the forest boundary and comply with all the conditions recommended by the Divisional Commissioner committee meeting under the chairmanship of the Divisional Commissioner Rewa..

VI. PP shall plant 3 years old 3000 saplings @600 saplings per year in the next five years of suitable tree species i.e. Neem, Mango, Bargad, Peepal, Jamun, Imli, Karanj, Amaltas, Bael etc. will be planted along the lease Boundary in mine premises, transportation route and at Khasra no. 860/1/KA/1 in consultation with DM/ Gram Panchayat. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

VII. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

VIII. The overburden and waste will be stacked within the ML area and simultaneously backfilled in the mined out area where plantation will be raised on it.

IX. PP shall ensure that waste material shall not be stacked for a long time in the ML area.

X. No overburden will be dumped outside the mine lease area.

XI. Regular water quality monitoring shall be carried out by PP before discharging it into the nearby agriculture fields from authorized laboratory in consultation with Regional Officer, MPPCB. Regular air and noise quality

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 32 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

monitoring shall also be carried out from authorized laboratories in consultation with Regional Officer, MPPCB at regular intervals.

XII. PP shall ensure the generation of employment opportunities nearby Village on priority basis.

XIII. Payments of wages to the workers shall be done in consonance with the provisions in the labour laws.

XIV. Proper infrastructure with shelter, drinking water, toilet and first-aid facilities shall be provided for the laborers. A provision should be made to construct a pakka rest shelter along with toilet and drinking water facility.

XV. PP should also carry out regular sprinkling in the mining lease area to arrest dust emission from mining activities affecting the nearby agriculture fields.

XVI. Mining shall be limited to the area as shown in surface plan and as per the approved mining scheme.

XVII. PP shall ensure the proper water supply arrangements for plantations especially in the summer season.

XVIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

XIX. PP must ensure the implementation of compliance of the commitment made in Public Hearing in addition to these following activities with separate budget provision under CER as committed.

❖ Upgradation of Govt. School and Anganwadi of nearby village by repairing the boundary wall and construction of approach road up to the main road with proper maintenance.

❖ To provide drinking water and sanitation facilities in the Anganwari centres of Chormari and Bairha villages.

❖ To organize a health check-up camp and distribution of masks and sanitisers at nearby villages.

❖ As per OM of MoEFCC, grazing land will be developed as a Fodder plot in consultation with the local body.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 33 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

XX. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Prior Environment Clearance for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.00 ha. for production capacity of 5000 cum per annum at Khasra No. 860/1/KA/1 at Village - Chormari, Tehsil - Rampur Baghelan, Dist. - Satna (MP) for the lease period to Shri Atul Singh Tiwari, Village - Chormari, Tehsil - Rampur Baghelan, Dist.- Satna (MP).

4. Case No. 6880/2020, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 3.420 ha. for production capacity of 12,000 cum per annum at Khasra No. 841/1/KA/1 at Village - Chormari, Tehsil - Rampur Baghelan, Dist. - Satna (MP) Shri Romit Pandey S/o Shri Arun Pandey, E-08/68, Arera Colony, Basant Kunj, Tehsil - Huzur, Dist. Bhopal (M.P).

(1) This is a project pertaining to mining of Stone Quarry in MLA of 3.42 ha. The activity is mentioned at S.No. 1 (a) of the Schedule of EIA Notification 2006 as amended from time to time. The project is reported to be at a distance of more than 10 km from National Park /Sanctuary etc. thus it is not attracted by the general conditions by virtue of its location and mining lease area. There is a forest boundary within 250 m distance from the ML area. The committee constituted under the Chairmanship of Divisional Commissioner has given the permission on the condition that the chainlink fencing with thick plantation shall be carried out towards the forest area and leaving the area of 210 m from forest boundary as no mining zone. The case was forwarded by SEIAA to SEAC for appraisal of EIA for environmental clearance for the project. It was submitted that this is a fresh grant issued in the year of 2018 for 10 years.

(2) The mining lease was granted to Shri Romit Pandey S/o Shri Arun Pandey, E-08/68, Arera Colony, Basant Kunj, Tehsil - Huzur, Dist. Bhopal in the year of 2018 for 10 years, which is applicable after lease agreement. This is a case of fresh grant. The Mining Plan with progressive mine closure plan has been approved by Regional Office, Rewa of DGM vide Letter No. – 2067-68/M.P./Na.Kra./ 2018 rewa dated 28.12.2018.

(3) SEAC in its 498th SEAC meeting dtd. 06.04.2021 has recommended the case with 36 special conditions for issuance of EC.

(4) It was noted that as per DFO L.No. 12474 Singrauli, dtd. 26.12.2019, the National Park /Sanctuary is not located within 10 Km. radius from the mining site. Hence, the General Conditions are not attracted. There is a forest boundary within 250 m distance from the ML area. The committee constituted under the Chairmanship of Divisional Commissioner has given the permission on the condition that the chainlink fencing with thick plantation shall be carried

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 34 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

out towards the forest area and leaving the area of 210 m from forest boundary as no mining zone..

(5) PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail.

(6) It was noted that the water requirement is 11.0 KLD (0.33 KLD for Domestic use/ Drinking + 8.0 KLD for Dust suppression + 2.67 KLD for Green Belt). The water requirement will be met through tankers from nearby villages and mine pit water.

(7) The proposed plantation programme was examined and it was found that the plantation of 1025 tree saplings per year shall be covered under the plantation program.

(8) It was also noted that the Public Hearing was carried out on 08.01.2021 at mine parisar Village - Chormari, Tehsil - Rampur Baghelan, Dist. - Satna (MP) under the Chairmanship of Additional Collector, Satna.

After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

II. Lease agreement shall be carried out before execution of mining operation.

III. Plantation programme as mentioned in EIA/EMP and presented during presentation in SEIAA & SEAC shall be followed in content and spirit.

IV. PP shall demarcate a barrier zone of 7.5 m as no mining zone in the periphery of mining lease area and develop a green belt. Three rows plantation shall be carried out in the greenbelt area in the current year with proper watering arrangement.

V. PP shall ensure to construct chain link fencing on ML bouandry with dense plantation towards the forest boundary and leave the area from ML boundary at a distance of 210 m upto forest boundary as a no mining zone.

VI. PP shall plant 3 years old 5130 saplings @1025 saplings per year in the next five years of suitable tree species i.e. Neem, Mango, Bargad, Peepal, Jamun, Imli, Karanj, Amaltas, Bael etc. will be planted along the lease Boundary in mine premises, transportation route and at Khasra no. 860/1/KA/1 in consultation with DM/ Gram Panchayat. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

VII. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 35 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

VIII. The overburden and waste will be stacked within the ML area and simultaneously backfilled in the mined out area where plantation will be raised on it.

IX. PP shall ensure that waste material shall not be stacked for a long time in the ML area.

X. No overburden will be dumped outside the mine lease area.

XI. Regular water quality monitoring shall be carried out by PP before discharging it into the nearby agriculture fields from authorized laboratory in consultation with Regional Officer, MPPCB. Regular air and noise quality monitoring shall also be carried out from authorized laboratories in consultation with Regional Officer, MPPCB at regular intervals.

XII. PP shall ensure the generation of employment opportunities nearby Village on priority basis.

XIII. Payments of wages to the workers shall be done in consonance with the provisions in the labour laws.

XIV. Proper infrastructure with shelter, drinking water, toilet and first-aid facilities shall be provided for the laborers. A provision should be made to construct a pakka rest shelter along with toilet and drinking water facility.

XV. PP should also carry out regular sprinkling in the mining lease area to arrest dust emission from mining activities affecting the nearby agriculture fields.

XVI. Mining shall be limited to the area as shown in surface plan and as per the approved mining scheme.

XVII. PP shall ensure the proper water supply arrangements for plantations especially in the summer season.

XVIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

XIX. PP must ensure the implementation of compliance of the commitment made in Public Hearing in addition to these following activities in Chormari and Bairha village with separate budget provision under CER as committed.

❖ Upgradation of Govt. School building and Anganwadi bhawan of nearby village by repairing the boundary wall and construction of approach road up to the main road with proper maintenance in Chormari and Bairha village .

❖ To provide drinking water and sanitation facilities in the Anganwari centres of Chormari and Bairha villages.

❖ To organize a health check-up camp and distribution of masks and sanitisers at nearby villages.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 36 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ As per OM of MoEFCC, grazing land will be developed as a Fodder plot in consultation with the local body.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XX. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Prior Environment Clearance for Stone Quarry (opencast manual/semi mechanized method) in an area of 3.420 ha. for production capacity of 12,000 cum per annum at Khasra No. 841/1/KA/1 at Village - Chormari, Tehsil - Rampur Baghelan, Dist. - Satna (MP) for the lease period to Shri Romit Pandey S/o Shri Arun Pandey, E-18/68, Arera Colony, Basant Kunj, Tehsil - Huzur, Dist. Bhopal (MP).

5. Case No 8482/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity 72000 cum per annum at Khasra No. 141 at Village - Baharawan, Tehsil - Bankhedi, Dist. Hoshangabad (MP) by M/s R.K.Transport and Constructions Ltd, Director, Shri Chandra Prakash Singh, 65-A, Transport Nagar, Dist. - Korba, Chhattisgarh.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. Mining shall be carried out as per the approved mine plan by the competent authority. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:.

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 37 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

XIII. Total 6000 saplings of suitable tree species i.e., Kathal, Belpatra, Shajan, Arjun, Jamun, Paras-Pipal, Munga, Bargad, Neem, Pipal, Mango etc. shall be planted by PP in first three under plantation programme at River Bank and at Govt. Land of khasra no. 184/1 in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ Construction the boundary wall (200m), repairing work of school building by installing new fans (4nos ), doors (2 nos) , windows (4 nos) and provide 02 new blackboards at Government Middle School of Village – Bahrawan.

❖ Installation of a pipeline in the premises of Government Middle School with proper water storage facility at Village – Bahrawan.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 38 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity 72000 cum per annum at Khasra No. 141 at Village - Baharawan, Tehsil - Bankhedi, Dist. - Hoshangabad (MP) for the lease period to M/s R. K. Transport and Constructions Ltd., Director, Shri Chandra Prakash Singh, 65-A, Transport Nagar, Dist. - Korba, Chhattisgarh.

6. Case No 8483/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity 72000 cum per annum at Khasra No. 37/1 at Village - Guwadi, Tehsil – Seoni-Malwa, Dist. -Hoshangabad (MP) by M/s R.K.Transport and Constructions Ltd., Director, Shri Chandra Prakash Singh, 65-A, Transport Nagar, Dist. - Korba, Chhattisgarh.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. Mining shall be carried out as per the approved mine plan by the competent authority. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence the committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:.

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 39 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

XIII. Total 6000 saplings of suitable tree species i.e., Kathal, Arjun, Munga, Belpatra, Jamun, Paras-Pipal, Neem, Pipal, Mango, Bargad etc. shall be planted by PP in first three under plantation programme at River Bank and at Govt. Land of khasra no. 18/2 in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To construct a common toilet at Gram Panchayat premises of Village - Guwadi.

❖ To install a hand-pump (1 no.) and construction of concrete slab with drainage channel around the hand-pump at village – Guwadi for providing the drinking water facility to the villagers.

❖ To install a pipeline with a water storage tank in the premises Panchayat Bhavan at Village – Guwadi.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 40 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity 72000 cum per annum at Khasra No. 37/1 at Village - Guwadi, Tehsil – Seoni-Malwa, Dist. - Hoshangabad (MP) for the lease period to M/s R. K. Transport and Constructions Ltd., Director, Shri Chandra Prakash Singh, 65-A, Transport Nagar, Dist. - Korba, Chhattisgarh.

7. Case No 8484/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.30 ha. for production capacity of 7216 cum per annum at Khasra No. 1618 at Village - Ganayaari, Tehsil - Banda, Dist. Sagar (MP) Shri Ashish Kumar Jain S/o Shri Ashok Kumar Jain, Banda, Dist. Sagar, MP - 470001.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’::

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 41 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 1950 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Amaltas, Mango, Awla, Kathal, Kadam Gulmohar etc. shall be planted by PP along the Mine lease Boundary and at Khasra no. 1618, Village- Ganayaari, Tehsil- Banda, Dist. – Sagar (MP) on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue record to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with separate appropriate budget provision under CER as committed:

❖ Development of a grazing land at village – Ganayaari in consultation with gram Panchayat/ District Administration.

❖ To repair and white wash 02 classrooms of Govt. Primary School at village – Ganayaari.

❖ To provide a water filter (01 no.) to Govt. Primary School at Village - Ganayaari

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 42 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.30 ha. for production capacity of 7216 cum per annum at Khasra No. 1618 at Village - Ganayaari, Tehsil - Banda, Dist.- Sagar (MP) for the lease period to Shri Ashish Kumar Jain S/o Shri Ashok Kumar Jain, Banda, Dist. - Sagar, MP - 470001.

8. Case No 8485/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.70 ha. for production capacity of 10268 cum per annum at Khasra No. 128/1 at Village - Aapchand, Tehsil - Sagar, Dist. Sagar (MP) Shri Kamal Jeet Singh, Dist.- Damoh (MP) - 470661.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 43 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

xii. Total 3000 saplings of suitable tree species i.e. Peepal,Karanj, Neem,Saptparni, Gulmohar ,Bargad, Khirni ,Mango, Kalasiris, Amla,Imli etc. shall be planted by PP along the mine lease boundary and at Survey No.- 128/1 Village - Aapchand on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

viii. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

ix. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To repair and white wash 02 classrooms of Govt. Primary School at village – Ganayaari.

❖ To provide a water filter (01 no.) to Govt. Primary School at Village - Ganayaari

❖ In order to upgrade the Aanganwadi at Village Aapchand construction of 01 Room (15 ft X 20 Ft) and repairing of walls shall be carried out at Anganwadi.

❖ To provide toys to Anganwadi at Village Aapchand.

❖ To distribute masks & sanitizers to the villagers of nearby villages.

❖ To develop grazing land in consultation with gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

x. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.70 ha. for production capacity of 10268 cum per annum at Khasra No. 128/1 at Village - Aapchand, Tehsil -

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 44 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Sagar, Dist. - Sagar (MP) for the lease period to Shri Kamal Jeet Singh, Dist.- Damoh (MP) - 470661.

9. Case No 8486/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 3.0 ha. for production capacity of 25456 cum per annum at Khasra No. 3012/1 at Village - Rajnagar, Tehsil - Rajnagar, Dist. Chhatarpur (MP) Shri Jeet Singh Bundela S/o Shri Shyamleju Bundela, Sichai Colon, Tehsil - Rajnagar, Dist. - Chhatarpur (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that during presentation it was also observed that a human settlement at a distance of 210 m in the North side. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. PP shall ensure that proper curtaining arrangements and dense plantation shall be carried out towards habitation falling at 210 m towards the north direction of the mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 45 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

xiii. Total 3000 saplings of suitable tree species i.e. Pipal, Bargad, Neem, Sissoo, Aam, Amla, Mahua etc. shall be planted by PP along the mine lease boundary, both side of the approach road and at Khasra no. 3012/1 on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct two classrooms in Govt. Primary School at village - Rajnagar.

❖ To install one handpump in Govt. Primary School at village - Rajnagar.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 3.0 ha. for production capacity of 25456 cum per annum at Khasra No. 3012/1 at Village - Rajnagar, Tehsil - Rajnagar, Dist. Chhatarpur (MP) for the lease period to Shri Jeet Singh Bundela S/o Shri Shyamleju Bundela, Sichai Colon, Tehsil - Rajnagar, Dist. - Chhatarpur (MP).

10. Case No 8488/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 4.0 ha. for production capacity of 10584 cum per annum at Khasra No. 190 at Village - Hasinabad, Tehsil - Khaknar, Dist. Burhanpur (MP) Ku. Surbhi Thakur D/o Shri Surendra Singh Thakur, Behind Naval Petrol Pump, Khandwa Road, Dist. Burhanpur, MP - 450331.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 46 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that a pucca road at 115 m in the East side of the lease. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The dense plantation shall be carried out towards pucca road at 115 m distance in the east direction of mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

xiv. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Dalbargia sissoo, Bargad, Amaltas, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary, both side of the approach road and at Khasra no. 190 part on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years..

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 47 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities in village Hasinabad with appropriate budget provision under CER as committed:

❖ Upgradation of Anganbadi bhawan,

❖ Installation of Seesaw (02 nos) and Slides (02 nos) at Govt. Primary School, Village - Hasinabad,

❖ To distribute masks & sanitizers to the villagers of nearby villages.

❖ To develop a grazing land at nearby village in consultation with gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 4.0 ha. for production capacity of 10584 cum per annum at Khasra No. 190 at Village - Hasinabad, Tehsil - Khaknar, Dist. Burhanpur (MP) for the lease period to Ku. Surbhi Thakur D/o Shri Surendra Singh Thakur, Behind Naval Petrol Pump, Khandwa Road, Dist. Burhanpur, MP - 450331 (MP).

11. Case No 8489/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.0 ha. for production capacity of 16400 cum per annum at Khasra No. 461/1 at Village - Akyadeh, Tehsil - Piploda, Dist. Ratlam (MP) Shri Shantilal Rudani S/o Shri Somji Rudabni, 06, Poonam Vihar Colony, Tehsil - Jaora, Dist. Ratlam, MP - 457333.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 48 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

xv. Total 1500 saplings of suitable tree species i.e. Neem, Pipal, Dalbargia sissoo, Bargad, Amaltas, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary and at Khasra no. 461/1 on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

viii. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

ix. PP must ensure the implementation of the following activities in village Akydeh with appropriate budget provision under CER as committed:

❖ To install a water filter (01 no.) and provide table & chair (10 nos) to Govt. Primary School, Village - Akyyadeh.

❖ To distribute masks & sanitizers to the villagers of nearby villages.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 49 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To develop a grazing land at Village - Akyyadeh in consultation with gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

x. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.0 ha. for production capacity of 16400 cum per annum at Khasra No. 461/1 at Village - Akyadeh, Tehsil - Piploda, Dist. Ratlam (MP) for the lease period to Shri Shantilal Rudani S/o Shri Somji Rudabni, 06, Poonam Vihar Colony, Tehsil - Jaora, Dist. Ratlam, MP - 457333.

12. Case No 8525/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.687 ha. for production capacity of 13000 cum per annum at Khasra No. 295/2, 296/2/kha, 297/2/kha, 298/2, 295/1, 296/2/ka, 297/2/ka, 298/1 at Village - Tiwani, Tehsil - Rampur Baghelan, Dist. Satna (MP) Shri Shankar Singh S/o Late Shri Ramshraya Singh, Tiwani, Tehsil - Rampur Baghelan, Dist. Satna, MP - 485115.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that 02 trees are in existence within the lease area for which PP submitted that both trees will be uprooted and 20 trees additionally will be planted, a kachha road is existed at a distance of 70 m in the East side of the lease. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 50 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

xvi. Total 2550 saplings of suitable tree species i.e. Neem, Pipal, Dalbargia sissoo, Bargad, Amaltas, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary and at Khasra no. 682 on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

viii. PP committed that additional 20 plant saplings shall be planted as a compensatory plantation for uprooting of 02 existing trees in the mining lease area in consultation with forest officials and District Administration.

ix. The dense plantation shall be carried out towards Pakka road falling at a distance of 70 m in east direction of mining lease area.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To provide Seesaw (02 nos) and Slides (03 nos) at Govt. Primary School, Village - Tiwani.

❖ To distribute masks & sanitizers to the villagers of nearby villages.

❖ To develop a grazing land at Village – Tiwani in consultation with gram Panchayat/ District Administration.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 51 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.687 ha. for production capacity of 13000 cum per annum at Khasra No. 295/2, 296/2/kha, 297/2/kha, 298/2, 295/1, 296/2/ka, 297/2/ka, 298/1 at Village - Tiwani, Tehsil - Rampur Baghelan, Dist. Satna (MP) for the lease period to Shri Shankar Singh S/o Late Shri Ramshraya Singh, Tiwani, Tehsil - Rampur Baghelan, Dist. - Satna, MP - 485115.

13. Case No. 8505/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.471 ha. for production capacity of 10260 cum per annum at Khasra No. 16/1 at Village - Harraha, Tehsil - Mauganj, Dist. - Rewa (MP) Shri Sharad Kumar Gupta S/o Shri Satyaveer Prasad Gupta, MSD 162, Sector 258, Tehsil - Dadari, Dist. Gautam Buddha Nagar (UP ) - 486331.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that During presentation it was also observed that a kachha road is existed at a distance of 05 m, hence 05 m set back to be left, another kachcha road is at 72 m in the SW side of the lease and in the East side of the lease plantation is seen PP submitted that this shall be no mining area. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 52 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. PP shall ensure to leave no mining zone of 10 m from Kachha road passing near the mine site and also to leave no mining area of 72 m shall be left towards the another Pakka road passing in South West direction of the M L. PP shall ensure dense plantation to be carried out in No Mining Zone .

v. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 2300 saplings of suitable tree species i.e. Neem, Pipal, Saptparni, Gulmohar, Bargad, Amla, Kalasiris, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary and at Khasra no. 125 on Govt. land of Village – Biharna in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years..

x. No existing tree shall be uprooted in the mining lease area bu PP.

xi. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xii. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct a boundary wall and provide a water filter (01 nos) to Govt. Middle School at Village -Harraha..

❖ To distribute masks & sanitizers to the villagers of nearby village.

❖ To develop a grazing land at Village – Harraha in consultation with gram Panchayat/ District Administration.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 53 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xiii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.471 ha. for production capacity of 10260 cum per annum at Khasra No. 16/1 at Village - Harraha, Tehsil - Mauganj, Dist. - Rewa (MP) for the lease period to Shri Sharad Kumar Gupta S/o Shri Satyaveer Prasad Gupta, MSD 162, Sector 258, Tehsil - Dadari, Dist. Gautam Buddha Nagar (UP ) - 486331.

14. Case No. 8501/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.70 ha. for production capacity of 7999 cum per annum at Khasra No. 21/2 at Village - Rodiya, Tehsil - Bhikangaon, Dist. Khargone (MP) by M/s Chanda Stone Crusher, Village - Sinhasa, Tehsil - Indore, Dist. Indore, MP - 451113.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 54 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. Dense plantation shall be carried out towards the canal at a distance of 180 m from the lease area.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 2620 saplings of suitable tree species i.e. Pipal, Amla, Mango, Karanj, Neem, Shajan, Dalbargia- Sissoo, Kathal, Bargad etc. shall be planted by PP along the mine lease boundary and at Khasra no. 16/3 on Govt. land of Village – Rodiya in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

x. PP shall carry out plantation of additional 70 no of plants as a compensatory plantation (@10 plants/ uprooted tree) for uprooting of 07 trees out of 09 existing trees in the ML area in consultation with district administration and remaining 02 trees shall not be uprooted.

xi. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xii. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To install a pipeline with proper water supply facility at Govt. Primary School, Village – Rodiya in consultation with Gram Panchayat, Rodiya.

❖ To develop a grazing land at Village – Rodiya in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 55 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xiii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.70 ha. for production capacity of 7999 cum per annum at Khasra No. 21/2 at Village - Rodiya, Tehsil - Bhikangaon, Dist. Khargone (MP) for the lease period to M/s Chanda Stone Crusher, Village - Sinhasa, Tehsil - Indore, Dist. Indore, MP - 451113.

15. Case No. 8507/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.44 ha. for production capacity of 300 cum per annum at Khasra No. 3/2, 3/5 at Village - Jaitakheda, Tehsil - Shahpura, Dist. Jabalpur (MP) by M/s M.K.S.Minerals & Marble, Azad Ward, Dist. Mandla, MP - 482001.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. PP shall leave 06 m as no mining zone from the Kachha road passing at a distance of 04 m in east direction of mining lease area and dense plantation shall be carried out towards the kaccha road side on ML boundary.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 56 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

xvii. Total 3000 saplings of suitable tree species i.e. Pipal, Aam, Imli, Karanj, Neem, Saptparni, Kalasiris, Amla, Khirni, Bargad etc. shall be planted by PP along the mine lease boundary and at Khasra no. 143/1 on Govt. land of Village - Jaitakheda in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first year itself.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To establish a Science Lab (with all mandatory equipments) and a Library at Govt. HighSchool of Village – Jaitakheda.

❖ Upgradation of Aanganwadi Bhawan at Village Jaitakheda.

❖ Distribution of masks & sanitizers to the habitants of Village - Jaitakheda.

❖ Development of a grazing land at Village – Jaitakheda in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 57 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.44 ha. for production capacity of 300 cum per annum at Khasra No. 3/2, 3/5 at Village - Jaitakheda, Tehsil - Shahpura, Dist. Jabalpur (MP) for the lease period to M/s M.K.S.Minerals & Marble, Azad Ward, Dist. Mandla, MP - 482001.

16. Case No. 8514/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.0 ha. for production capacity of 19993 cum per annum at Khasra No. 133, 134 at - Garadehi, Tehsil - Junnardeo, Dist. - Chhindwara (MP) by Smt. Apurva Sharma W/o Shri Adarsh Sharma, Ward No. 6, Junnardeo, Dist. Chhindwara, MP - 480001.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall carry out chain-link fencing with dense plantation on lease boundary towards the forest area in consultation with officials of the forest department and maintain it as a buffer zone .

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 58 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 1500 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Amaltas, Mango, Sal, Kathal, Gulmohar etc. shall be planted by PP along the mine lease boundary and at Khasra No. 133 on Govt. land of Village- Garadehi in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To provide perforated chairs (1 no) of size: Length -62 cm, Width - 174 cm, Height - 78 cm for the bus stop of Village – Garadehi.

❖ To install Handpump (01 no) at Village - Garadehi.

❖ To provide swings in Govt. Primary School at Village - Garadehi

❖ To develop a grazing land at Village – Garadehi in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.0 ha. for production capacity of 19993 cum per annum at Khasra No. 133, 134 at - Garadehi, Tehsil - Junnardeo, Dist. - Chhindwara (MP) for the lease period to Smt. Apurva Sharma W/o Shri Adarsh Sharma, Ward No. 6, Junnardeo, Dist. Chhindwara, MP - 480001.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 59 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

17. Case No 8509/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity 65000 cum per annum at Khasra No. 283/290 at Village - Charakwah, Tehsil - Jaisinghnagar, Dist. Shahdol (MP) by M/s Vanshika Construction, Authorized Person, Shri Ramlal Jhariya, Devri Rajmarg, Dist. - Narsinghpur.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 60 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

XIII. Total 6000 saplings of suitable tree species i.e., Arjun,Karanj, Kadam, Jamun, Bargad, Neem, Pipal, Mango etc. shall be planted by PP in the first three under plantation programme at River Bank and at Govt. Land of khasra no. 112/115 (Govt. School), 253 (Panchayat Bhawan) and 260/1/1 (Aanganwadi) at village – Charakwah in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out the plantation programme as proposed.

XIV. Over loading shall be strictly prohibited.

XV. Water sprinkling shall be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ Installation of borewell system (01 no.) in Samudayik Bhawan at Village - Charakwah.

❖ White wash of school building and painting of doors & windows of the Govt. Middle School situated at Village - Charakwah.

❖ Development of Grazing Land in a 7500 sq ft. area at village – Charakwah.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity 65000 cum per annum at Khasra No. 283/290 at Village - Charakwah, Tehsil - Jaisinghnagar, Dist. - Shahdol (MP) for the lease period to M/s Vanshika Construction, Authorized Person, Shri Ramlal Jhariya, Devri Rajmarg, Dist. - Narsinghpur.

18. Case No 8508/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 2.314 ha. for production capacity 42060 cum per annum at Khasra No. 165 at Village - Boddiha-2, Tehsil - Beohari, Dist.- Shahdol (MP) by M/s Vanshika Construction, Authorized Person, Shri Ramlal Jhariya, Devri Rajmarg, Dist. - Narsinghpur.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 61 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 3500 saplings of suitable tree species i.e., Arjun,Karanj, Kadam, Dumar, Dhawa, Sarai, Jamun, Bargad, Neem, Pipal, Mango etc. shall be planted by PP in first three under plantation programme at River Bank & along the approach road at Khasra no. 165 and at Govt. Land of khasra no. 128 (Govt. School), 194 (Panchayat Bhawan) and 172 (Aanganwadi) at village – Charakwah in consultation with Gram Panchayat/ District

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 62 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

XIV. Over loading shall be strictly prohibited.

XV. Water sprinkling shall be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To provide 20 nos of iron made tables and 20 nos of benches to a Govt. Primary School, Boddiha.

❖ Development of Grazing Land in 5000 sq ft. area at Village – Boddiha.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 2.314 ha. for production capacity 42060 cum per annum at Khasra No. 165 at Village - Boddiha-2, Tehsil - Beohari, Dist.- Shahdol (MP) for the lease period to M/s Vanshika Construction, Authorized Person, Shri Ramlal Jhariya, Devri Rajmarg, Dist. - Narsinghpur.

19. Case No. 8513/2021, Prior Environment Clearance for Murrum Quarry (opencast manual/semi-mechanized method) in an area of 1.25 ha. for production capacity of 6287 cum per annum at Khasra No. 18 Part at Village - Badiyakheda, Tehsil - Jabalpur, Dist. Jabalpur (MP) by Shri Shakti Mishra S/o Shri P.C.Mishra, 245, Saketdham, Gwarighat, Dist. Jabalpur, MP - 482001.

This case was recommended in the 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 63 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall leave no mining zone of 25 m towards the canal passing at a distance of 75 m in the South-East direction from the mining lease area. PP shall also ensure to carry out dense plantation within the no mining area and on the govt land available between the canal & ML area .

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 1875 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Amaltas, Mango, Jungle Jalebi, Kathal, Gulmohar etc. shall be planted by PP along the mine lease boundary and at Khasra No. 18 part of Govt. land of Village- Badiyakheda in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 64 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To provide perforated chairs (2 nos.) of size: Length -62 cm, Width - 174 cm, Height - 78 cm for the common sitting area of the village and for a bus stop of Village – Badiyakheda.

❖ To provide a water filter (1 no.) at Govt. Primary School, Badiyakheda.

❖ To develop a grazing land at Village – Badiyakheda in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.25 ha. for production capacity of 6287 cum per annum at Khasra No. 18 Part at Village - Badiyakheda, Tehsil - Jabalpur, Dist. Jabalpur (MP) for the lease period to Shri Shakti Mishra S/o Shri P.C.Mishra, 245, Saketdham, Gwarighat, Dist. Jabalpur, MP - 482001.

20. Case No 8512/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.50 ha. for production capacity 6000 cum per annum at Khasra No. 243 at Village - Umarkhali, Tehsil - Gogawan, Dist. Khargone (MP) by M/s R.K.Transport and Constructions Ltd, Director, Shri Chandra Prakash Singh, 65-A, Transport Nagar, Dist. - Korba, Chhattisgarh.

This case was recommended in 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 65 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 6000 saplings of suitable tree species i.e., Arjun, Jamun, Munga, Bargad, Neem, Pipal, Mango, Amla, Imli, Chirol, Sheesham (Dalbergia sisoo), Subabool, Amaltas etc. shall be planted by PP in first three year under plantation programme at River Bank, both side of approach road and at Govt. Land near the proposed project in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ Development of grazing land near the proposed ML area at Village - Umarkhali.

❖ To construct a boundary wall of Govt. Primary School at Village – Umarkhali.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 66 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To carry out the white-wash of Aganwadi Kendra at Village - Umarkhali.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.50 ha. for production capacity 6000 cum per annum at Khasra No. 243 at Village - Umarkhali, Tehsil - Gogawan, Dist. Khargone (MP) for the lease period to M/s R. K. Transport and Constructions Ltd., Director, Shri Chandra Prakash Singh, 65-A, Transport Nagar, Dist. - Korba, Chhattisgarh.

21. Case No. 8511/2021, Prior Environment Clearance for Soil/ Murrum Quarry (opencast manual/semi-mechanized method) in an area of 1.00 ha. for production capacity of 15000 cum per annum at Khasra No. 205 at Village - Irli, Tehsil - Malhargarh, Dist. - Mandsaur (MP) by M/s Ankita Construction Company, 22, Swariya Colony, Dist. -Nimbaheda, Raj. - 312601.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 67 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. Dense plantation shall be carried out towards the existing pucca road passing at a distance of 120 m in the east direction and three rows plantation also to be carried out towards the stadium located at 110 m in the south direction of mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 1500 saplings of suitable tree species i.e. Palash, Neem, Karanj, Mango, Pipal, Bargad etc. shall be planted by PP along the mine lease boundary, barrier zone, approach road and at Khasra No. 205 on Govt. land of Village- Irli in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first year itself.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ Upgradation of Aanganwadi (whitewash and maintenance work ) at Village – Irli.

❖ To develop a grazing land at Village – Irli in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 68 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Soil/ Murrum Quarry (opencast manual/semi mechanized method) in an area of 1.00 ha. for production capacity of 15000 cum per annum at Khasra No. 205 at Village - Irli, Tehsil - Malhargarh, Dist. - Mandsaur (MP) for the lease period to M/s Ankita Construction Company, 22, Swariya Colony, Dist. -Nimbaheda, Raj. - 312601.

22. Case No. 8506/2021, Prior Environment Clearance for Soil/ Murrum Quarry (opencast manual/semi-mechanized method) in an area of 1.00 ha. for production capacity of 7500 cum per annum at Khasra No. 15 at Village - Galiyara, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Ankita Construction Company, 22, Swariya Colony, Dist. -Nimbaheda, Raj. - 312601.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 69 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

v. Dense plantation shall be carried out towards the Solar Plant located at west side of the mining lease area and plantation should be done in consultation with officials of the distinct administration and forest department.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 1500 saplings of suitable tree species i.e. Palash, Neem, Karanj, Mango, Pipal, Bargad etc. shall be planted by PP along the mine lease boundary, barrier zone, approach road and at Khasra No. 15 on Govt. land of Village- Galiyara in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first year itself.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ Upgradation of Anganwadi (whitewash and maintenance work ) at Village – Galiyara.

❖ To develop a grazing land at Village – Galyara in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 70 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Soil/Murrum Quarry (opencast manual/semi mechanized method) in an area of 1.00 ha. for production capacity of 7500 cum per annum at Khasra No. 15 at Village - Galiyara, Tehsil - Sitamau, Dist.- Mandsaur (MP) for the lease period to M/s Ankita Construction Company, 22, Swariya Colony, Dist. -Nimbaheda, Raj. - 312601.

23. Case No. 8523/2021, Prior Environment Clearance for Soil/ Murrum Quarry (opencast manual / semi-mechanized method) in an area of 2.00 ha. for production capacity of 25000 cum per annum at Khasra No. 365/3, 365/4 at Village - Manasakhurd, Tehsil - Malhargarh, Dist. - Mandsaur (MP) by M/s Ankita Construction Company, 22, Swariya Colony, Dist. -Nimbaheda, Raj. - 312601.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. Dense plantation shall be carried out towards the pucca road at a distance of approx 50 m in the south side of the mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 71 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 3000 saplings of suitable tree species i.e. Palash, Neem, Karanj, Mango, Pipal, Bargad etc. shall be planted by PP along the mine lease boundary, barrier zone, approach road and at Khasra No. 398 on Govt. land of Village- Manasakhurd in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first year itself.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To upgrade the Village Primary School building by carrying out the whitewash and maintenance work of school at Village Manasakhurd.

❖ To develop a grazing land at Village – Manasakhurd in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Soil/Murrum Quarry (opencast manual/semi mechanized method) in an area of 2.00 ha. for production capacity of 25000 cum per annum at Khasra No. 365/3, 365/4 at Village - Manasakhurd, Tehsil - Malhargarh, Dist. - Mandsaur (MP) for the lease period to M/s Ankita Construction Company, 22, Swariya Colony, Dist. -Nimbaheda, Raj. - 312601.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 72 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

24. Case No. 8527/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.80 ha. for production capacity of 25859 cum per annum at Khasra No. 104/1 at Village - Dhriwankala, Tehsil - Shahpura, Dist. Dindori (MP) by Shri Harsh Mandawi S/o Shri Ramesh Kumar Mandawi, Dhirwankala, Tehsil - Shahpura, Dist. Dindori, MP - 481990.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that that settlement at a distance of 550 m in the east side and pucca road at 100 m in the north side. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. Dense plantation shall be carried out towards the pucca road passing at 100 m in the north side of the mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Mango, Kathal, Jamun, Bargad etc. shall be planted by PP along the mine lease boundary, barrier zone, approach road and at Khasra No. 104/1 on private waste land of Village- Dhriwankala in consultation with Gram Panchayat/ DM. PP shall

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 73 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To upgrade the Village Primary School building by carrying out the whitewash and maintenance work of school at Village Manasakhurd.

❖ To develop a grazing land at Village – Manasakhurd in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.80 ha. for production capacity of 25859 cum per annum at Khasra No. 104/1 at Village - Dhriwankala, Tehsil - Shahpura, Dist. - Dindori (MP) for the lease period to Shri Harsh Mandawi S/o Shri Ramesh Kumar Mandawi, Dhirwankala, Tehsil - Shahpura, Dist. - Dindori, MP - 481990.

25. Case No. 8487/2021, Prior Environment Clearance for Soil Quarry (opencast manual/semi-mechanized method) in an area of 1.00 ha. for production capacity of 2000 cum per annum at Khasra No. 610, 611 at Village - Tindoli, Tehsil - Sabalgarh, Dist. - Morena (MP) by Shri Rajiv Kumar Gupta S/o Shri Gopal Gupta, Village - Sabalgarh, Dist. - Morena, MP - 476229.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Soil Quarry thus no blasting is proposed. PP further submitted that maximum depth will not be > 2.00 meters and kiln is not proposed in the lease. The EMP and other

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 74 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 1500 saplings of suitable tree species i.e. Peepal,Chirol, Kadam, Neem, Saptparni, Munga,Mango, Bargad, Amla, Gulmohar, Jamun, Imlli etc. shall be planted by PP along the mine lease boundary, barrier zone, approach road and at Khasra No. 43 on Govt. land in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first year itself.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To provide a sports kit and 02 sets of computer systems to the Govt. High School at Village –Tindoli.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 75 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ Distribution of masks & sanitizers at Village –Tindoli

❖ To develop a grazing land at Village – Tindoli in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Soil Quarry (opencast manual/semi mechanized method) in an area of 1.00 ha. for production capacity of 2000 cum per annum at Khasra No. 610, 611 at Village - Tindoli, Tehsil - Sabalgarh, Dist. - Morena (MP) for the lease period to Shri Rajiv Kumar Gupta S/o Shri Gopal Gupta, Village - Sabalgarh, Dist. - Morena, MP - 476229.

26. Case No 8516/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 5.0 ha. for production capacity 10000 cum per annum at Khasra No. 548 at Village - Dehri Khurd, Tehsil - Aron, Dist. Guna (MP) by M/s Vijay Builders, 15, Gam Bamlabe, Tehsil - Biaora, Dist. Rajgarh (MP) - 473001.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. Mining shall be carried out as per the approved mine plan. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 76 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 7500 saplings of suitable tree species i.e., Arjun, Kadam, Gulmohar, Neem,Peepal, Amltas Mango, Amla, Jamun , Munga etc. shall be planted by PP in first three years under plantation programme at River Bank and at Govt. Land of khasra no. 548 in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To provide 50 sets of table & chair @ Rs 1500/set to Govt. High School, Village –Dehri Khurd .

❖ To develop a playground at Govt. High School, Village –Dehri Khurd.

❖ Distribution of masks & sanitizers shall be carried out to the habitants of Village - Dehri Khurd.

❖ To develop a Grazing Land at a nearby village in consultation with Gram Panchayat/District Administration.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 77 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP shall ensure contribution of funds on behalf of the village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 5.0 ha. for production capacity 10000 cum per annum at Khasra No. 548 at Village - Dehri Khurd, Tehsil - Aron, Dist. Guna (MP) for the lease period to M/s Vijay Builders, 15, Gam Bamlabe, Tehsil - Biaora, Dist. Rajgarh (MP) - 473001.

27. Case No 8515/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 5.0 ha. for production capacity 10000 cum per annum at Khasra No. 251 at Village - Berkhedi, Tehsil - Guna, Dist. - Guna (MP) by M/s Vijay Builders, 15, Gam Bamlabe, Tehsil - Biaora, Dist. Rajgarh (MP) - 473001.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. Mining shall be carried out as per the approved mine plan. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 78 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 7500 saplings of suitable tree species i.e., Arjun, Kadam, Gulmohar, Neem,Peepal, Amltas Mango, Amla, Jamun , Munga etc. shall be planted by PP in first three years under plantation programme at River Bank and at Govt. Land of khasra no. 251 in consultation with the Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To construct a boundary wall and develop a playground in Govt. High School at Village – Berkhedi.

❖ Distribution of masks & sanitizers shall be carried out to the habitants of Village - Berkhedi.

❖ To develop a Grazing Land at a nearby village in consultation with Gram Panchayat/District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 79 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 5.0 ha. for production capacity 10000 cum per annum at Khasra No. 251 at Village - Berkhedi, Tehsil - Guna, Dist. - Guna (MP) for the lease period to M/s Vijay Builders, 15, Gam Bamlabe, Tehsil - Biaora, Dist. Rajgarh (MP) - 473001.

28. Case No 8517/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 5.0 ha. for production capacity 10000 cum per annum at Khasra No. 186 at Village - Bhamavad, Tehsil - Kumbhraj, Dist.- Guna (MP) by M/s Vijay Builders, 15, Gam Bamlabe, Tehsil - Biaora, Dist. - Rajgarh (MP) - 473001.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. Mining shall be carried out as per the approved mine plan. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 80 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 7500 saplings of suitable tree species i.e., Arjun, Kadam, Gulmohar, Neem,Peepal, Amltas Mango, Amla, Jamun , Munga etc. shall be planted by PP in first three years under plantation programme at River Bank and at Govt. Land of khasra no. 186 in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To establish a library and construct a boundary wall in Govt. Middle school at Village –Bhamavad.

❖ To distribute masks & sanitizers at Village - Bhamavad.

❖ To develop a Grazing land at nearby village in consultation with Gram Panchayat / District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 81 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 5.0 ha. for production capacity 10000 cum per annum at Khasra No. 186 at Village - Bhamavad, Tehsil - Kumbhraj, Dist.- Guna (MP) for the lease period to M/s Vijay Builders, 15, Gam Bamlabe, Tehsil - Biaora, Dist. Rajgarh (MP) - 473001.

29. Case No. 8503/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.19 ha. for production capacity of 8678 cum per annum at Khasra No. 294 Part at Village - Jamuniya, Tehsil - Jabalpur, Dist. Jabalpur (MP) by Shri Amar Mishra S/o Shri P.C.Mishra, 245, Saketdham, Gawarighat, Dist. - Jabalpur, MP - 482001.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone Quarry. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 82 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 1800 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Amaltas, Mango, Sal, Kathal, Gulmohar etc. shall be planted by PP along the mine lease boundary, barrier zone and at Khasra No. 294 part of Govt. land at Village- Jamuniya in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three year.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To provide a water filter (01 no.) at Govt. Primary School, Jamuniya

❖ To construct 02 nos of toilet at Govt. Primary School, Jamuniya.

❖ To develop a grazing land at Village – Jamuniya in consultation with Gram Panchayat/ District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.19 ha. for production capacity of 8678 cum per annum at Khasra No. 294 Part at Village - Jamuniya, Tehsil - Jabalpur, Dist. Jabalpur (MP) for the lease period to Shri Amar Mishra S/o Shri P.C.Mishra, 245, Saketdham, Gawarighat, Dist. Jabalpur, MP – 482001.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 83 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

30. Case No 8502/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.00 ha. for production capacity 32400 cum per annum at Khasra No. 100 at Village - Kudari, Tehsil - Gadarwara, Dist.- Narsinghpur (MP) by M/s Dhanlaxmi Marchendais Pvt. Ltd, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. Hoshangabad, MP - 461001.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

PP has submitted the response of above quarries same date vide letter dated 06.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 84 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

XIII. Total 7500 saplings of suitable tree species i.e., Neem, Pipal, Bargad, Amaltas, Mango, Jungle Jalebi, Kathal, Gulmohar etc. shall be planted by PP in first three years under plantation programme at River Bank and at Govt. Land of khasra no. 123/1, Village - Kudari in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To renovate Community Hall at Village- Kudari.

❖ To provide a water filter at primary school, Kudari.

❖ To develop a Grazing land at nearby Village – Kudari in consultation with Gram Panchayat / District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.00 ha. for production capacity 32400 cum per annum at Khasra No. 100 at Village - Kudari, Tehsil - Gadarwara, Dist.- Narsinghpur (MP) for the lease period to M/s Dhanlaxmi Marchendais Pvt. Ltd, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. Hoshangabad, MP - 461001.

31. Case No 8504/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.00 ha. for production capacity 95000 cum per annum at Khasra No. 854 Part at Village - Khairi, Tehsil - Khairlanji, Dist. Balaghat (MP) by Shri Rajesh Pathak, Ward No. 15, Baiher Road, Dist. Balaghat, MP - 481001.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 85 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. Mining shall be carried out as per the approved mine plan. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 6000 saplings of suitable tree species i.e., Neem, Arjun, Kadam, Amltas , Peepal, Gulmohar , Bargad, Aam, Amla, Jamun , Munga and Arjun etc. shall be planted by PP in first three years under plantation programme at River Bank and at Govt. Land of Khasra no. 854 in consultation with the Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 86 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To construct a boundary wall and 2 classrooms (15 ft X 20 ft ) in Govt. Middle school Village –Khairi.

❖ To distribute masks & sanitizers at Village - Khairi.

❖ To develop a Grazing land at Village – Khairi in consultation with Gram Panchayat / District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.00 ha. for production capacity 95000 cum per annum at Khasra No. 854 Part at Village - Khairi, Tehsil - Khairlanji, Dist.- Balaghat (MP) for the lease period to Shri Rajesh Pathak, Ward No. 15, Baiher Road, Dist. Balaghat, MP - 481001.

32. Case No 8521/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.90 ha. for production capacity 29697 cum per annum at Khasra No. 397 Part at Village - Dadia, Tehsil - Lalbarra, Dist. Balaghat (MP) by Shri Rajesh Pathak, Ward No. 15, Baiher Road, Dist. Balaghat, MP - 481001.

This case was recommended in the 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining. During presentation as per Google image based on coordinates provided by PP, it was observed that the part of the lease is submerged in the water. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 87 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 7600 saplings of suitable tree species i.e., Neem, Arjun, Kadam, Amltas , Peepal, Gulmohar , Bargad, Aam, Amla, Jamun , Munga and Arjun etc. shall be planted by PP in first three years under plantation programme at River Bank, lease boundary and at Khasra no. 159 of Govt. Land in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 88 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To install 01 Handpump, repair boundary walls and construct toilets of Gram Panchayat Bhawan at Village - Dadia

❖ To construct 01 classroom (15 Ft X 20 Ft) in Govt. Middle school at Village – Dadia.

❖ To distribute masks & sanitizers at Village - Dadia.

❖ To develop a Grazing land at Village – Dadia in consultation with Gram Panchayat / District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.90 ha. for production capacity 29697 cum per annum at Khasra No. 397 Part at Village - Dadia, Tehsil - Lalbarra, Dist. Balaghat (MP) for the lease period to Shri Rajesh Pathak, Ward No. 15, Baiher Road, Dist. - Balaghat (MP) - 481001.

33. Case No. 8499/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.00 ha. for production capacity of 20500 cum per annum at Khasra No. 235 Part at Village - Tanodiya, Tehsil - Agar, Dist. Agar Malwa (MP) by Shri Prahlad Singh, Village -Tanodiya, Tehsil - Agar, Dist. Agar - Malwa (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that Natural drain at a distance of 80 m in the south-east, Stadium at 230 m in the south direction & Mandi at 330 m in the South-East side. PP submitted that Controlled Muffle blasting will be carried out along with arrangements of sand bags and three rows of plantation shall be done in this side. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 89 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. Dense plantation shall be carried out towards the natural drain at a distance of 80 m in the south-east, towards the Stadium located at 230 m in the south direction & towards the Mandi at 330 m in the South-East side direction from the mining lease area by PP.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 3000 saplings of suitable tree species i.e. Amla, Mango, Neem, Dalbargia Sissoo, Gulmohar, Bargad, Pipal, Karanj, Paras Pipal, Kathal etc. shall be planted by PP along the mine lease boundary, barrier zone and at Khasra No. 196 on Govt. Land at Village - Tanodia in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue record to carry out the plantation programme as proposed. Plantation shall be carried out in the first three year.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To distribute sports kits at Govt. Middle School, Village -Tanodiya.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 90 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To install a pipeline with a water storage tank for facilitating water supply system at Govt Middle School, Tanodiya.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.00 ha. for production capacity of 20500 cum per annum at Khasra No. 235 Part at Village - Tanodiya, Tehsil - Agar, Dist. - Agar-Malwa (MP) for the lease period to Shri Prahlad Singh, Village -Tanodiya, Tehsil - Agar, Dist. - Agar - Malwa (MP).

34. Case No. 8498/2021, Prior Environment Clearance for Murrum Quarry (opencast manual/semi-mechanized method) in an area of 1.50 ha. for production capacity of 17530 cum per annum at Khasra No. 290, 291 at Village - Sikroda Futkar, Tehsil - Gwalior, Dist. Gwalior (MP) by Shri Ajab Singh Yadav, Village - Badgaon, Dist. Gwalior, MP.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Murrum Quarry thus no blasting is proposed. During presentation it was also observed that a Kachcha road at a distance of 90 m in the SW side. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 91 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The dense plantation shall be carried out towards Kachcha road at a distance of 90 m in the south- west direction from the mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Dalbargia sissoo, Bargad, Amaltas, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary, barrier zone, approach road and on Govt. Land at Khasra No. 292, Village – Sikroda Futkar in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three year.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct separate toilets for girls & boys with proper water storage facility at Govt. Primary School, Sikroda Futkar.

❖ To distribute masks & hand sanitizers to the villagers of nearby village.

❖ To develop grazing land in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 92 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Murrum Quarry (opencast manual/semi mechanized method) in an area of 1.50 ha. for production capacity of 17530 cum per annum at Khasra No. 290, 291 at Village - Sikroda Futkar, Tehsil - Gwalior, Dist. Gwalior (MP) for the lease period to Shri Ajab Singh Yadav, Village - Badgaon, Dist. Gwalior, MP.

35. Case No. 8497/2021, Prior Environment Clearance for Murrum Quarry (opencast manual/semi-mechanized method) in an area of 1.00 ha. for production capacity of 10023 cum per annum at Khasra No. 244 at Village - Khajuri, Tehsil - Katni, Dist. - Katni (MP) by Shri Anand Pandey S/o Shri Laxmi Prasad Pandey, Gol Bazar, Opp. Sindhi Gurudware, Hanumanganj, Dist. - Katni (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Murrum Quarry thus no blasting is proposed. During presentation it was also observed that a kachha road is existed at a distance of 20 m in the south side of the lease and a pond at existed at 250 m in the East side and a settlement in NE side at 510 m. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The dense plantation shall be carried out by PP towards the kachha road falling at a distance of 20 m in the south direction,towards the pond at a

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 93 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

distance of 250 m in the East direction and a settlement is falling at 510 m north- east direction from the mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 1500 saplings of suitable tree species i.e. Neem, Bargad, Ashok, Mango, Pipal and Jack Fruit etc. shall be planted by PP along the mine lease boundary, barrier zone, both side of approach road and on Govt. Land of the nearby village in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in first three year.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct separate toilets for girls & boys with proper water storage facility at Govt. Primary School, Khajuri.

❖ To repair, colour and maintain the wall of Govt. Primary School, Khajuri and provide see- saw, swing, slide and merry- go-round for the students.

❖ To repair boundary wall & toilet and carried out plantation in the Aagnwadi boundary of Village – Khajuri..

❖ To repair & colour the building of Govt. High School, Jarwani.

❖ To distribute sports kits, provide equipment for smart class, develop library and organise vocational training for the students of Govt. High School, Jarwani.

❖ To develop grazing land in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 94 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Murrum Quarry (opencast manual/semi mechanized method) in an area of 1.00 ha. for production capacity of 10023 cum per annum at Khasra No. 244 at Village - Khajuri, Tehsil - Katni, Dist. - Katni (MP) for the lease period to Shri Anand Pandey S/o Shri Laxmi Prasad Pandey, Gol Bazar, Opp. Sindhi Gurudware, Hanumanganj, Dist. - Katni (MP).

36. Case No. 8496/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 1.619 ha. for production capacity of 10002 cum per annum at Khasra No. 530/1/1, 530/1/2, 530/1/3 at - Raksha, Tehsil - Manpur, Dist. Umariya (MP) by Shri Mayank Singh Parihar S/o Shri Braj Kumar Singh, Near Gayatri Vihar, ITI, Badabag, Dist. Rewa, MP - 486001 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 95 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 3000 saplings of suitable tree species i.e. Neem, Bargad, Mango, Pipal, Chirol, Munga, Amla Karanj, Imli and etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Khasra no. 530/1/1, 530/1/2, 530/1/3 of the nearby village - Raksha in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three year.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct 02 nos of concrete benches at the bus stop of Village - Raksha.

❖ Upgradation of Govt. Middle School building at Village – Raksha.

❖ To develop grazing land in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 96 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 1.619 ha. for production capacity of 10002 cum per annum at Khasra No. 530/1/1, 530/1/2, 530/1/3 at - Raksha, Tehsil - Manpur, Dist. Umariya (MP) for the lease period to Shri Mayank Singh Parihar S/o Shri Braj Kumar Singh, Near Gayatri Vihar, ITI, Badabag, Dist. Rewa, MP - 486001 (MP).

37. Case No 8495/2021, Prior Environment Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.00 ha. for production capacity 10000 cum per annum at Khasra No. 44 Part at Village - Lalpura, Tehsil - Maheshwar, Dist. Khargone (MP) by M/s R.K.Gupta Contractors and Engineers Pvt. Ltd, Authorized Person, Shri Rajendra Kumar Gupta, B-72, Shahpura, Dist. Bhopal, MP - 451224.

This case was recommended in 498th SEAC meeting dated 06.04.2021 and it was recorded that..........

"The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining on Narmada River. PP submitted that only manually method shall be carried out as per approved mine plan. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:"

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dated 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. The mining shall be carried out strictly as per the approved annual replenishment of sand in the mining lease area is sufficient to sustain the mining operations at levels prescribed in the mining plan

IV. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

V. The entire lease area should be properly fenced and boundary stones marked at the site.

VI. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VII. PP shall ensure leaving the submerged area as a non-mining zone.

VIII. PP shall ensure compliance of the direction and provision made for sand mining methodology up to 5 ha. lease area as per the Notification 30.08.2019 issued by MP Mineral Resource Department, GoMP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 97 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

IX. Mining shall be carried out by manual method.

X. The depth of the pit shall be as per Approved Mining Plan.

XI. No transportation shall be permitted within the village.

XII. Alternate transportation routes should be decided in consultation with the local Gram Panchayat.

XIII. Total 6000 saplings of suitable tree species i.e., Neem, Arjun, Sisoo, Chirol, Subabool, Peepal, Gulmohar , Bargad, Aam, Amla, Jamun, Munga and Imli etc. shall be planted by PP in first three years under plantation programme at River Bank, along the approach road with tree guard, lease boundary and Govt. Land in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. The plantation shall be carried out in the first year itself.

XIV. Overloading will be strictly prohibited.

XV. Water sprinkling will be done on the approach road on the regular basis.

XVI. PP must ensure the implementation of following CER as committed :

❖ To construct a Pucca Chabutra (3m X 6m) and provide a water filter at Govt. Primary School, Village – Lalpura.

❖ To develop a Grazing land at Village – Lalpura in consultation with Gram Panchayat / District Administration.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XVII. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (Opencast Manual Method) in an area of 4.00 ha. for production capacity 10000 cum per annum at Khasra No. 44 Part at Village - Lalpura, Tehsil - Maheshwar, Dist. Khargone (MP) for the lease period to M/s R.K.Gupta Contractors and

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 98 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Engineers Pvt. Ltd, Authorized Person, Shri Rajendra Kumar Gupta, B-72, Shahpura, Dist. Bhopal, MP – 451224.

38. Case No. 8494/2021, Prior Environment Clearance for Murrum Quarry (opencast manual/semi-mechanized method) in an area of 2.00 ha. for production capacity of 12000 cum per annum at Khasra No. 89 at Village - Debari, Tehsil - Ghatiya, Dist. Ujjain (MP) by Smt. Sadhna Kunwar, Lakhaheda, Ghatiya, Dist. Ujjain (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Murrum Quarry thus no blasting is proposed. during presentation as per Google image based on coordinates provided by PP, it was observed that the lease area is already excavated .PP submitted that they have got this lease in such condition and pit has shown on surface map. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Dalbargia sissoo, Bargad, Amaltas, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Khasra no. 89 of villages - Debari in consultation with Gram Panchayat/ DM.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 99 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in first three year.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct separate toilets for girls & boys with proper water storage facility at Govt. Primary School, Dabari.

❖ To distribute masks & hand sanitizers to the villagers of village Dabari.

❖ To develop grazing land at Village - Dabari in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Murrum Quarry (opencast manual/semi mechanized method) in an area of 2.00 ha. for production capacity of 12000 cum per annum at Khasra No. 89 at Village - Debari, Tehsil - Ghatiya, Dist. Ujjain (MP) for the lease period to Smt. Sadhna Kunwar, Lakhaheda, Ghatiya, Dist. Ujjain (MP).

39. Case No. 8490/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.00 ha. for production capacity of 19000 cum per annum at Khasra No. 181, 186, 196 at Village - Kuberpura, Tehsil - Rama, Dist. - Jhabua (MP) by Shri Nilesh Katara S/o Kantilal Katara, Para, Rama, Dist. Jhabua, MP - 457661 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 100 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Dalbargia sissoo, Bargad, Amaltas, Khirni, Mango, Guava, Imli etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Khasra no. 358 of village - Kuberpura in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three year.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 101 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To provide water filter( 01 no) and overhead tank of 2000 L capacity ( 01 ) no with proper water connectivity to Govt. Primary School, village Kuberpura.

❖ To distribute masks & hand sanitizers to the villagers of village Kuberpura..

❖ To develop grazing land at Village - Kuberpura in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.00 ha. for production capacity of 19000 cum per annum at Khasra No. 181, 186, 196 at Village - Kuberpura, Tehsil - Rama, Dist. - Jhabua (MP) for the lease period to Shri Nilesh Katara S/o Kantilal Katara, Para, Rama, Dist. Jhabua, MP - 457661 (MP).

40. Case No. 8520/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 3.50 ha. for production capacity of 28785 cum per annum at Khasra No. 205 at Village - Jambura, Tehsil - Ujjain, Dist. Ujjain (MP) by Shri Vishal Rajoriya S/o Shri Dwarka Prasad Rajoriya, 8, Bhakt Nagar, Dist. Ujjain, MP - 456661 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 102 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 3000 saplings of suitable tree species i.e. Peepal,Karanj, Neem,Saptparni ,Gulmohar ,Bargad, Khirni ,Mango, Kalasiris , Amla,Imli etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Survey No.- 205, Village - Jambura in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three year.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To upgrade Anganwadi of Village – Jambura by constructing 01 no. of room (15ft X 20ft), repairing of walls and providing the toys, table and chairs.

❖ To distribute masks & hand sanitizers to the villagers of village Jambura.

❖ To develop grazing land at Village - Jambura in consultation with Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 103 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 3.50 ha. for production capacity of 28785 cum per annum at Khasra No. 205 at Village - Jambura, Tehsil - Ujjain, Dist. Ujjain (MP) for the lease period to Shri Vishal Rajoriya S/o Shri Dwarka Prasad Rajoriya, 8, Bhakt Nagar, Dist. Ujjain (MP) - 456661.

41. Case No. 8522/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.0 ha. for production capacity of 19932 cum per annum at Khasra No. 187/3, 187/4 at Village - Panjara, Tehsil - Narsinghpur, Dist. - Narsinghpur (MP) by M/s Maruti Enterprises, Partner, Shri Ajay Singh S/o Shri Gurumukh Singh, Kothari Complex, Jail Ke Pass, Kandeli, Tehsil & Dist. Narsinghpur, MP - 462001 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that a pucca road at a distance of 70 m in the North side of the lease. After presentation the committee asked to submit revised EMP. PP has submitted the response of above quarries same date vide letter dated 06.04.2021. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 104 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. Dense plantation shall be carried out towards the pucca road passing at a distance of 70 m in the North direction from the mining lease area.

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 3000 saplings of suitable tree species i.e. Gulmohar, Peepal, Neem, Bargad, Mango, Imli , Kala siris, Arjun, Jamun, Ashoka etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Khasra no. 187/3 & 197 of Village - Panjara in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first two years.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To upgrade Anganwadi bhawan of Village – Panjara

❖ To provide benches in Govt. Primary School, Pataniya

❖ To develop grazing land at Village - Pataniya in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 105 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.0 ha. for production capacity of 19932 cum per annum at Khasra No. 187/3, 187/4 at Village - Panjara, Tehsil - Narsinghpur, Dist. - Narsinghpur (MP) for the lease period to M/s Maruti Enterprises, Partner, Shri Ajay Singh S/o Shri Gurumukh Singh, Kothari Complex, Jail Ke Pass, Kandeli, Tehsil & Dist.- Narsinghpur - 462001 (MP).

42. Case No. 8519/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.83 ha. for production capacity of 15000 cum per annum at Khasra No. 132, 563, 564, 567, 568 at Village - Kajrawada, Tehsil - Nainpura, Dist. Mandla (MP) by Shri Ashish Kumar Pande S/o Shri M.D.Pande, Bamhni Banjar, Tehsil & Dist. Mandla, MP - 481661 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was also observed that Kachcha aroid is existed at a distance of 10 m in the south side. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: ”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The dense plantation shall be carried out towards Kachcha road at a distance of 10 m in the south direction from the mining lease area.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 106 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

vi. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vii. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

viii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

ix. Total 3000 saplings of suitable tree species i.e. Gulmohar, Peepal, Neem, Bargad, Mango, Imli , Kalasiris, Saptparni, Arjun, Jamun, Ashoka etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Khasra no. 28 of Village - Kajrawada in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first two years.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To develop a playground, installation of 01 no. of water filter and to provide sports kit to Govt. High School at Village Kajrwada.

❖ To distribute masks and hand sanitisers at village - Kajrwada

❖ To develop grazing land at Village - Kajrwada in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 107 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.83 ha. for production capacity of 15000 cum per annum at Khasra No. 132, 563, 564, 567, 568 at Village - Kajrawada, Tehsil - Nainpura, Dist. Mandla (MP) for the lease period to Shri Ashish Kumar Pande S/o Shri M.D.Pande, Bamhni Banjar, Tehsil & Dist. Mandla, MP - 481661 (MP).

43. Case No. 8526/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 3.750 ha. for production capacity of 170430 cum per annum at Khasra No. 663, 664, 686, 687 at Village - Gowai, Tehsil - Gwalior, Dist. - Gwalior (MP) by Shri Shivendra Pratap Singh Tomar S/o Shri Ajay Pratap Singh Tomar, Arya Nagar, Murar, Dist. - Gwalior, MP - 474001 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 108 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

viii. Total 6000 saplings of suitable tree species i.e. Gulmohar, Peepal, Neem, Bargad, Mango, Imli, Kalasiris, Saptparni, Karanj, Jamun etc. shall be planted by PP along the mine lease boundary, barrier zone and on Govt. Land at Khasra no. 378/1 of Village - Gowai in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first two years.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ Construction of 2 Smart Class rooms in Govt. High School at Village-Gowai.

❖ Repairing of walls and providing toys in Village-Gowai Anganwadi.

❖ Distribution of masks & sanitizers in Village –Gowai.

❖ Development of Grazing Land in Village –Gowai.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi-mechanized method) in an area of 3.750 ha. for production capacity of 170430 cum per annum at Khasra No. 663, 664, 686, 687 at Village - Gowai, Tehsil - Gwalior, Dist. - Gwalior (MP) (MP) for the lease period to Shri Shivendra Pratap Singh Tomar S/o Shri Ajay Pratap Singh Tomar, Arya Nagar, Murar, Dist. - Gwalior, MP - 474001.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 109 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

44. Case No. 8530/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.150 ha. for production capacity of 50000 cum per annum at Khasra No. 53/2, 53/5, 53/4/1 at Village - Supaavalii, Tehsil - Morar, Dist. Gwalior (MP) by M/s Jay Mahakali Stone Crusher LLP, Prop., Shri Vishal Chaturvedi, 11-12, Patel Nagar, City Centre, Dist. Gwalior, MP - 474006 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 3000 saplings of suitable tree species i.e. Gulmohar, Bargad, Khirni, Peepal, Karanj, Neem, Saptparni, Mango, Kalasiris, Amla, Imli etc. shall be planted by PP along the mine lease boundary and on Govt. Land at Khasra No. 121 in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 110 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

plantation programme as proposed. Plantation shall be carried out in the first two years.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ In order to upgrade the Gram Panchayat Bhawan PP shall construct 02 Rooms (15 ft X 20 Ft), repair the walls and toilets of Gram Panchayat Bhawan at Village - Supaavalii.

❖ To distribute masks and hand sanitisers at the village – Supa Avalii.

❖ To develop grazing land at Village - Supaavalii in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.150 ha. for production capacity of 50000 cum per annum at Khasra No. 53/2, 53/5, 53/4/1 at Village - Supaavalii, Tehsil - Morar, Dist. - Gwalior (MP) for the lease period to M/s Jay Mahakali Stone Crusher LLP, Prop., Shri Vishal Chaturvedi, 11-12, Patel Nagar, City Centre, Dist. Gwalior, MP - 474006 (MP).

45. Case No. 8298/2021, Prior Environment Clearance for Murrum Quarry (opencast manual/semi-mechanized method) in an area of 2.00 ha. for production capacity of 25000 cum per annum at Khasra No. 1207 at Village - Ringnod, Tehsil - Sardarpur, Dist. Dhar (MP) by Shri Bhojraj Komadiya S/o Shri Ramesh Chandra Komadiya, Village - Rajgarh, Tehsil - Sardarpur, Dist.- Dhar (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 111 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

“------------PP vide letter dated 05.04.2021 has submitted in the response of above quarry the same was placed before the committee and found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Aam, Gulmohar, Jamun, Bargad, Amrud, Sissoo, Ashok etc. shall be planted by PP along the mine lease boundary and on Govt. Land at a nearby village in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first three years.

ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

x. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 112 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

❖ To install pipelines with proper water storage facilities at Govt. School, Village – Ringod.

❖ To install a water filter at Govt. School Village – Ringnod.

❖ To develop grazing land at Village - Ringnod in consultation with Gram Panchayat.

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xi. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.00 ha. for production capacity of 25000 cum per annum at Khasra No. 1207 at Village - Ringnod, Tehsil - Sardarpur, Dist. - Dhar (MP) for the lease period to Shri Bhojraj Komadiya S/o Shri Ramesh Chandra Komadiya, Village - Rajgarh, Tehsil - Sardarpur, Dist.- Dhar (MP).

46. Case No. 8138/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 3.286 ha. for production capacity of 32300 cum per annum at Khasra No. 90 at Village - Chhind, Tehsil - Udaipura, Dist. – Raisen (MP) by Smt. Jaikumar Bai Rajput W/o Shri Prem Singh Rajput, Ward No. 03, Udaipura, Dist. Raisen, MP – 464551 (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 03.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 113 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of the lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table, approval of the Central Ground Water Board shall be obtained.

vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vii. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

viii. Total 6000 saplings of suitable tree species i.e. Bargad, Maharukh, Peepal, Karanj, Chirol, Neem, Khirni, Mango, Kalasiris, Tamarind, Amla etc. shall be planted by PP along the mine lease boundary and on Govt. Land at Survey No.- 121/5 Village- Chhind in consultation with Gram Panchayat/ DM. PP shall also explore and identify the chunk of land in the area from revenue records to carry out the plantation programme as proposed. Plantation shall be carried out in the first year itself.

ix. No tree shall be uprooted in the Mining Lease area.

x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

xi. PP must ensure the implementation of the following activities with appropriate budget provision under CER as committed:

❖ To construct a boundary wall in Govt. Middle School at village Chhind.

❖ To provide 25 sets of tables and chairs and sports kit to Govt Middle school at Village - Chhind.

❖ Contribution of funds for Jal Jeevan Mission in consultation with Janpad Panchayat - Chhind.

❖ To develop grazing land at Village - Chhind in consultation with Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 114 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

PP shall ensure contribution of funds on behalf of the village under Jal Jeevan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or anganwadis of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xii. PP should ensure to submit a half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC, GoI, Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 3.286 ha. for production capacity of 32300 cum per annum at Khasra No. 90 at Village - Chhind, Tehsil - Udaipura, Dist. – Raisen (MP) for the lease period to Smt. Jaikumar Bai Rajput W/o Shri Prem Singh Rajput, Ward No. 03, Udaipura, Dist. - Raisen, MP – 464551 (MP).

47. Case No. 8266/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.0 ha. for production capacity of 12500 cum per annum at Khasra No. 14, 15, 16, 17, 18, 31 at Village - Utti, Tehsil - Jobat, Dist. Alirajpur (MP) by M/s Shree Udaigarh Balwadi Highway Private Ltd, M/s Shreeji Infraspace Pvt. Ltd, Ahmedabad, R/o, Hal Mukam, Tehsil - Jobat, Dist. - Alirajpur (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 03.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was observed through Google Earth satellite imagery that the other mines are visible in the vicinity of 500 m radius of the proposed mines. However, the Mining Officer vide Letter No. 74 dtd. 27.01.2021 mentioned that there is no other mine is sanctioned /operational in the 500 m periphery of the proposed mine.

After detailed discussion, it is decided to send a letter to Mining officer, Alirajpur to clarify the present status of sanctioned/ operational mines that

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 115 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

exist within 500 m periphery of the proposed mines. Copy to Collector, Alirajpur and PP also.

48. Case No. 8267/2021, Prior Environment Clearance for Stone Quarry (opencast manual/semi-mechanized method) in an area of 2.0 ha. for production capacity of 12500 cum per annum at Khasra No. 35, 48, 49, 180/1, 180/2, 180/3, 180/4, 180/5 at Village - Utti, Tehsil - Jobat, Dist. - Alirajpur (MP) by M/s Shree Udaigarh Balwadi Highway Private Ltd, M/s Shreeji Infraspace Pvt. Ltd, Ahmedabad, R/o, Hal Mukam, Tehsil - Jobat, Dist. - Alirajpur (MP).

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 03.04.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:”

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 498th SEAC meeting dtd. 06.04.2021, presentation made by the PP in SEIAA, it was observed through Google Earth satellite imagery that the other more mines are visible in the vicinity of 500 m radius of the proposed mines. However, the Mining Officer vide Letter No. 76 dtd. 27.01.2021 mentioned that there is no other mine is sanctioned /operational in the 500 m periphery of the proposed mine.

After detailed discussions, it is decided to send a letter to Mining officer, Alirajpur to clarify the present status of sanctioned / operational mines that exist within 500 m periphery of the proposed mines. after that the case will be apprised. Copy to Collector, Alirajpur and PP also.

49. Case No 8500/2021, Prior Environmental Clearance for Stone Quarry in an area of 1.905 for production capacity of 17818 cum per annum at Khasra No. 375 at Village - Lahadpur, Tehsil - Isagarh, Dist. - Ashoknagar (MP) by Shri Brajnarayan Sharma S/o Shri Vrandawan Sharma, Baheriya, Roopnagar, Tehsil - Isagarh, Dist. Ashoknagar, MP – 473335.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

"………..The case was scheduled for the presentation but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings. Since the tenure of SEAC will be over on 09th April, 2021 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please."

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 116 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

50. Case No 8518/2021, Prior Environmental Clearance for Stone Quarry in an area of 4.0 ha for production capacity of 3325 cum per annum at Khasra No. 151, 152 at Village - Rajeev Nagar, Tehsil - Huzur, Dist. Bhopal (MP) by Shri Mahesh Patidar S/o Shri Kailash Patidar, H.No. 06, Block Ekta, Chinar Fortune City, Hoshangabad Road, Dist. Bhopal, MP - 462047.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

"………..The case was scheduled for the presentation but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings. Since the tenure of SEAC will be over on 09th April, 2021 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please."

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

51. Case No 8529/2021, Prior Environmental Clearance for Stone Quarry in an area of 1.689 ha for production capacity of 18430 cum per annum at Khasra No. 378 at Village - Lahadpur, Tehsil - Isagarh, Dist. - Ashoknagar (MP) by Shri Vinod Sharma S/o Shri Brajnarayan Sharma, Baheriya, Tehsil - Isagarh, Dist. Ashoknagar, MP - 473335.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

"……….. The case was scheduled for the presentation but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call the PP in subsequent meetings. Since the tenure of SEAC will be over on 09th April, 2021 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please."

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

52. Case No 6923/2020, Prior Environmental Clearance for Stone Quarry in an area of 2.90 ha for production capacity of 8,416 cum per annum at Khasra No. 46/1 at Village - Sondul, Tehsil - Manawar, Dist. Dhar (MP) by M/s. Maa Narmada Crusher, Prop. Shri Ramlal Mandloi, Village - Borjhiri, Tehsil - Manawar, Dist. Dhar, MP – 454446.

This case was recommended in 498th SEAC meeting dtd. 06.04.2021 and it was recorded that..........

"……….. The case was scheduled for presentation, but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Earlier PP was also absent in 430th SEAC meeting dated 17/3/2020 & 432th SEAC meeting dated 18/5/2020. Committee decided that since sufficient opportunities has been given to the PP for appraisal of their case but PP remains absent thus committee decided that case shall be returned to SEIAA for delisting assuming that PP is not interested to continue with the project."

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 117 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

53. Case No 8524/2021, Prior Environment Clearance for Limestone, Bauxite & Clay Mine in an area of 69.301 ha. for production capacity of 909341 Tonne per annum at Khasra no.…. Village - Kubri, Tehsil - Maihar, Dist. Satna (MP) by M/s Sukhdeo Prasad Goenka, Goenka Bhavan, Station Road, Dist. Katni, MP - 483501.

This case was discussed in 498th SEAC meeting dtd. 06.04.2021, ToR recommended by SEAC is hereby approved.

54. Case No 8493/2021, Prior Environment Clearance for Sand Quarry in an area of 4.00 ha. for production capacity of 25000 cum per annum at Khasra no. 1165 Village - Banjari, Tehsil - Vijayraghavgarh, Dist. - Katni (MP) by M/s Vista Sales Pvt. Ltd, M-340, Goutam Nagar, Infront of Khadi Gram Udhyog Office, Near Chetak Bridge, Dist. Bhopal, MP - 462023.

This case was discussed in 498th SEAC meeting dtd. 06.04.2021, ToR recommended by SEAC is hereby approved.

55. Case No 8510/2021, Prior Environment Clearance for Iron Ore Mine in an area of 4.92 ha. for production capacity of 124120 cum per annum at Khasra no. 66, 67 Village - Bijaiya, Tehsil - Sihora, Dist. Jabalpur (MP) by Shri Sankalp Agarwal, Civil Line, Dist. Katni, MP - 483501.

This case was discussed in 498th SEAC meeting dtd. 06.04.2021, ToR recommended by SEAC is hereby approved.

56. Case No 8475/2021, Prior Environment Clearance for Stone Quarry in an area of 4.92 ha. for production capacity of 15000 cum per annum at Khasra no. 308P Village - Lakhanwah, Tehsil - Kotar, Dist. Satna (MP) by Shri Anil Kumar Khatri S/o Shri Keval Kumar Khatri, Ajay Bhawan, Bandhavgarh Colony, Raghurajnagar, Dist. Satna, MP - 485001.

This case was discussed in 498th SEAC meeting dtd. 06.04.2021, ToR recommended by SEAC is hereby approved.

57. Case No 8491/2021, Prior Environment Clearance for Stone Quarry in an area of 1.70 ha. for production capacity of 5000 cum per annum at Khasra no. 267/2, 268/1Kha, 268/2, 271//Gya/1, 271/1/Gya/2 Village - Badhaw Ubari, Tehsil - Nagod, Dist. Satna (MP) by Shri Shubham Goyal, Hariyana Bhawan, Panna Naka, Dist. Satna, MP - 485446.

This case was discussed in 498th SEAC meeting dtd. 06.04.2021, ToR recommended by SEAC is hereby approved.

58. Case No 8492/2021, Prior Environment Clearance for Expansion of Quartz Quarry in an area of 12.00 ha. for expansion in production capacity from 5000 TPA to 300000 at Khasra No. 993/2 Village - Dargawan, Tehsil - Tikamgarh, Dist.- Tikamgarh (MP) by Shri Brijesh Soni, Near Chhoti Devi Temple, Dist. Tikamgarh (MP).

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 118 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

This case was discussed in 498th SEAC meeting dtd. 06.04.2021, ToR recommended by SEAC is hereby approved.

59. Case No. 8543/2021, Prior Environment Clearance for Stone Quarry in an area of 1.60 ha. for production capacity of 8460 cum per annum at Khasra no. 360/1 Village - Basaahari, Tehsil - Khurai, Dist. - Sagar (MP) by M/s Badkul Enterprises, Partner Shri Ajad Kumar Jain R/o Pathak Ward, Distt. – Sagar (MP). - Regarding transfer of EC in the name of Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. Sagar – 470021.

(1) It is noted that the PP had applied in Form-7 for transfer of Prior Environmental Clearance for Stone Quarry in an area of 1.60 ha. for production capacity of 8460 cum per annum at Khasra No. 360/1 at Village - Basaahari, Tehsil - Khurai, Dist. - Sagar (MP) by Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar – 470021.

(2) The Prior Environmental Clearance letter was issued by DEIAA vide L.No. 128 DEIAA/2017 dated 27.03.2017 in the name of M/s Badkul Enterprises, Partner Shri Ajad Kumar Jain R/o Pathak Ward, Distt. – Sagar (MP).

(3) It is noted that in support of his request the PP has submitted the following documents

i. No Objection Certificate in the form of Notarised Affidavit submitted by M/s Badkul Enterprises, Partner Shri Ajad Kumar Jain R/o Pathak Ward, Distt. – Sagar (MP) for transfer of prior EC in the name of Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar – 470021 (MP).

ii. Notarised affidavit of Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar (MP) mentioning that no legal action/ credible action has been initiated against the mine till date and commitment to comply all the standard and specific conditions stipulated in the prior EC issued.

iii. Copy of Prior EC issued by DEIAA vide letter no.128 DEIAA/2017 dated 27.03.2017.

iv. Copy of Environmental Management Plan of Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar (MP).

v. Copy of Approved Mining Plan of Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar (MP).

vi. Lease transfer order issued by Office of Collector (Mining Division), Sagar to Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar (MP) vide letter No. 636/Khanij/2020 dated 23.11.2020.

(4) It is noted that in EIA Notification 2006 as per Para-11 Transferability of Environmental Clearance (EC) there is a provision of transferring the EC.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 119 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Para-11 :- A prior environmental clearance granted for a specific project or activity to an applicant may be transferred during its validity to another legal person entitled to undertake the project or activity on application by the transferor, or by the transferee with a written “no objection” by the transferor, to, and by the regulatory authority concerned, on the same terms and conditions under which the prior environmental clearance was initially granted, and for the same validity period. No reference to the Expert Appraisal Committee or State Level Expert Appraisal Committee concerned is necessary in such cases.

In context of above it seems that PP has submitted adequate documents to make the change in the name of PP as per EIA Notification 2006 (Para-11). Hence, prior EC issued by DEIAA on 27.03.2017 in the name of "M/s Badkul Enterprises, Partner Shri Ajad Kumar Jain R/o Pathak Ward, Distt. – Sagar (MP) is hereby transferred to Shri Pushpendra Patel S/o Shri Dulichand Patel, Village - Mazugwa, Tehsil & Dist. - Sagar – 470021 (MP) for Stone Quarry in an area of 1.60 ha. for production capacity of 8460 cum per annum at Khasra no. 360/1 Village - Basaahari, Tehsil - Khurai, Dist. – Sagar (MP)." on the same terms & conditions and validity period under which the prior environmental clearance was initially granted. All concerned be informed accordingly.

60. Case No. 8545/2021, Prior Environment Clearance for Stone Quarry in an area of 1.00 ha. for production capacity of 14221 cum per annum at Khasra no. 74 Village - Dhadhra, Tehsil - Jabalpur, Dist. - Jabalpur (MP) by Shri Ankit Mishra S/o Shri Jagdev Mishra R/o P-279, Shivnagar, Damoh Naka, District – Jabalpur (MP) - Regarding transfer of EC in the name of M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001 .

(1) It is noted that the PP had applied in Form-7 for transfer of Prior Environmental Clearance for Stone Quarry in an area of 1.00 ha. for production capacity of 14221 cum per annum at Khasra no. 74 Village - Dhadhra, Tehsil - Jabalpur, Dist. Jabalpur (MP) by M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001.

(2) The Prior Environmental Clearance letter was issued by DEIAA vide L.No. 74 DEIAA/2016 dated 03.09.2016 in the name of Shri Ankit Mishra S/o Shri Jagdev Mishra R/o P-279, Shivnagar, Damoh Naka, District – Jabalpur (MP).

(3) It is noted that in support of his request the PP has submitted the following documents

i. No Objection Certificate in the form of Notarised Affidavit submitted by Shri Ankit Mishra S/o Shri Jagdev Mishra R/o P-279, Shivnagar, Damoh Naka, District – Jabalpur (MP) for transfer of prior EC in the name of M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001.

ii. Notarised affidavit of M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001 mentioning that no legal action/ credible action has been initiated against the mine till date

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 120 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

and commitment to comply all the standard and specific conditions stipulated in the prior EC issued.

iii. Copy of Prior EC issued by DEIAA vide letter no. L.No. 74 DEIAA/2016 dated 03.09.2016.

iv. Copy of Environmental Management Plan of M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001.

v. Copy of Approved Mining Plan of M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001.

vi. Lease transfer order issued by Office of Collector (Mining Division), Jabalpur to M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001 vide letter No. 641-642/ Khanij/ 2019-20 dated 21.05.2020.

(4) It is noted that in EIA Notification 2006 as per Para-11 Transferability of Environmental Clearance (EC) there is a provision of transferring the EC.

Para-11 :- A prior environmental clearance granted for a specific project or activity to an applicant may be transferred during its validity to another legal person entitled to undertake the project or activity on application by the transferor, or by the transferee with a written “no objection” by the transferor, to, and by the regulatory authority concerned, on the same terms and conditions under which the prior environmental clearance was initially granted, and for the same validity period. No reference to the Expert Appraisal Committee or State Level Expert Appraisal Committee concerned is necessary in such cases.

In context of above it seems that PP has submitted adequate documents to make the change in the name of PP as per EIA Notification 2006 (Para-11). Hence, prior EC issued by DEIAA on 03.09.2016 in the name of " Shri Ankit Mishra S/o Shri Jagdev Mishra R/o P-279, Shivnagar, Damoh Naka, District – Jabalpur (MP) is hereby transferred to M/s Nayyar Goods Transport, House No. 785, Gupteswar Ward, Dist. - Jabalpur (MP) – 482001 for Stone Quarry in an area of 1.00 ha. for production capacity of 14221 cum per annum at Khasra no. 74 Village - Dhadhra, Tehsil - Jabalpur, Dist. - Jabalpur (MP)." on the same terms & conditions and validity period under which the prior environmental clearance was initially granted. All concerned be informed accordingly.

61. Case No. 5497/2021, Prior Environment Clearance for River Sand Deposit Quarry in an area of 7.00 ha. for production capacity of 5000 cum per annum at Khasra no. 484 Village- Chandangaon, Tehsil - Chhindwara, Dist. - Chhindwara (MP) by M/s Pawar Constructions, Ward No. 34, Mata Mandir Colony, Chandangaon, Tehsil & Dist.- Chhindwara (MP) - 480001 Regarding transfer of EC in the name of Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex, Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur – 440025 (Maharashtra).

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 121 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

(1) It is noted that the PP had applied in Form-7 for transfer of Prior Environmental Clearance for Stone Quarry in an area of 1.00 ha. for production capacity of 14221 cum per annum at Khasra no. 74 Village - Dhadhra, Tehsil - Jabalpur, Dist. Jabalpur (MP) by Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex, Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur – 440025 (Maharashtra).

(2) The Prior Environmental Clearance letter was issued by SEIAA vide L.No. 5659/SEIAA/17 dated 23.03.2017 in the name of M/s Pawar Constructions, Ward No. 34, Mata Mandir Colony, Chandangaon, Tehsil & Dist.- Chhindwara (MP).

(3) It is noted that in support of his request the PP has submitted the following documents.

i. No Objection Certificate in the form of Notarised Affidavit submitted by District Mining Officer, Chhiondwara - MP (on behalf of previous project proponent) for transfer of prior EC in the name of Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex , Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur (Maharashtra).

ii. Notarised affidavit of Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex , Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur (Maharashtra) mentioning that no legal action/ credible action has been initiated against the mine till date and commitment to comply all the standard and specific conditions stipulated in the prior EC issued.

iii. Copy of Prior EC issued by SEIAA vide letter no. vide L.No. 5659/SEIAA/17 dated 23.03.2017.

iv. Copy of Environmental Management Plan of Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex, Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur (Maharashtra).

v. Copy of Approved Mining Plan transferred by Collector, District –Chhindwara (vide Letter No. 4558 /sand/neelaam Khadan/ 2021 dated 01.03.2021) and approved replineshment plan to Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex, Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur (Maharashtra).

vi. Lease transfer order issued by Office of Mineral Resource Department, Govt. of Madhay Pradesh to Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex , Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur (Maharashtra) vide letter No. 1374-75/132/2020/12/1 dated 24.03.2021.

(4) It is noted that in EIA Notification 2006 as per Para-11 Transferability of Environmental Clearance (EC) there is a provision of transferring the EC.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 122 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

Para-11 :- A prior environmental clearance granted for a specific project or activity to an applicant may be transferred during its validity to another legal person entitled to undertake the project or activity on application by the transferor, or by the transferee with a written “no objection” by the transferor, to, and by the regulatory authority concerned, on the same terms and conditions under which the prior environmental clearance was initially granted, and for the same validity period. No reference to the Expert Appraisal Committee or State Level Expert Appraisal Committee concerned is necessary in such cases.

In context of above it seems that PP has submitted adequate documents to make the change in the name of PP as per EIA Notification 2006 (Para-11). Hence, prior EC issued by DEIAA on 23.03.2017.in the name of "M/s Pawar Constructions, Ward No. 34, Mata Mandir Colony, Chandangaon, Tehsil & Dist.- Chhindwara (MP) - 480001 is hereby transferred to Shri Shishir Khandar, Samsheesh Bhawan, 18 Malik complex, Tenament Hotel, Airport Center Point, Somalwada, Wardha Road, Nagpur – 440025 (Maharashtra) for River Sand Deposit Quarry in an area of 7.00 ha. for production capacity of 5000 cum per annum at Khasra no. 484 Village- Chandangaon, Tehsil - Chhindwara, Dist. - Chhindwara (MP)." on the same terms & conditions and validity period under which the prior environmental clearance was initially granted. All concerned be informed accordingly.

62. Case No. 4509/2021, Prior Environment Clearance for Sand Deposit Quarry in an area of 19.00 ha. for production capacity of 1,90,000 cum/year at Khasra no. 546, 850 Village-Khairauli, Tehsil-Mehgaon, District-Bhind (MP) by Sarpanch, Gram Panchayat, Kahirauli, Tehsil – Mehgaon, District – Bhind (MP) - Regarding transfer of EC in the name of M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002 .

(1) It is noted that the PP had applied in Form-7 for transfer of Prior Environmental Clearance for Sand Deposit Quarry in an area of 19.00 ha. for production capacity of 1,90,000 cum/year at Khasra no. 546, 850 Village-Khairauli, Tehsil-Mehgaon, District - Bhind (MP) by M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002.

(2) The Prior Environmental Clearance letter was issued by SEIAA vide L.No. 1899/2018 dated 09.03.2018 in the name of Sarpanch, Gram Panchayat, Kahirauli, Tehsil – Mehgaon, District – Bhind (MP).

(3) It is noted that in support of his request the PP has submitted the following documents

i. No Objection Certificate in the form of Notarised Affidavit submitted by Chief Executive Officer, Janpad Panchayat, Mehgaon, District – Bhind on behalf of previous project proponent for transfer of prior EC in the name of M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002.

ii. Notarised affidavit of M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 123 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

mentioning that no legal action/ credible action has been initiated against the mine till date and commitment to comply all the standard and specific conditions stipulated in the prior EC issued.

iii. Copy of Prior EC issued by SEIAA vide L.No. 1899/2018 dated 09.03.2018.

iv. Copy of Environmental Management Plan of M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002.

v. Copy of Approved Mining Plan of M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002.

vi. Lease transfer order issued by Mineral Resource Department to M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) vide letter No. 2775/ 132/2020/12/1 Bhopal , dated 24.06.2020.

(4) It is noted that in EIA Notification 2006 as per Para-11 Transferability of Environmental Clearance (EC) there is a provision of transferring the EC.

Para-11 :- A prior environmental clearance granted for a specific project or activity to an applicant may be transferred during its validity to another legal person entitled to undertake the project or activity on application by the transferor, or by the transferee with a written “no objection” by the transferor, to, and by the regulatory authority concerned, on the same terms and conditions under which the prior environmental clearance was initially granted, and for the same validity period. No reference to the Expert Appraisal Committee or State Level Expert Appraisal Committee concerned is necessary in such cases.

In context of above it seems that PP has submitted adequate documents to make the change in the name of PP as per EIA Notification 2006 (Para-11). Hence, prior EC issued by DEIAA on 09.03.2018 in the name of " Sarpanch, Gram Panchayat, Kahirauli, Tehsil – Mehgaon, District – Bhind (MP) is hereby transferred to M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002 for Sand Deposit Quarry in an area of 19.00 ha. for production capacity of 1,90,000 cum/year at Khasra no. 546, 850 Village-Khairauli, Tehsil-Mehgaon, District-Bhind (MP)." on the same terms & conditions and validity period under which the prior environmental clearance was initially granted. All concerned be informed accordingly.

63. Case No. 2921/2015, Prior Environment Clearance for River Sand Quarry in an area of 20.200 ha. for production capacity of 4,50,000 cum/year at Khasra no. 167/1 (new 253) Village-Gujarwada, Tehsil-Babai, District-Hoshangabad (MP) by Shri Raj Kumar Nema, OIC, Sub Off., M.P. State Mining Corporation Ltd., H.No. 12, Ward No. 17, Sainath Colony, Meenakshi, Hoshangabad (MP)-461001- Regarding transfer of EC in the name of M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh - 495677.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 124 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

(1) It is noted that the PP had applied in Form-7 for transfer of Prior Environmental Clearance for River Sand Quarry in an area of 20.200 ha. for production capacity of 4,50,000 cum/year at Khasra no. 167/1 (new 253) Village-Gujarwada, Tehsil-Babai, District - Hoshangabad (MP) by M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh - 495677.

(2) The Prior Environmental Clearance letter was issued by SEIAA vide L.No. 490/SEIAA/2018 dated 06.04.2016 in the name of Sarpanch, Shri Raj Kumar Nema, OIC, Sub Off., M.P. State Mining Corporation Ltd., H.No. 12, Ward No. 17, Sainath Colony, Meenakshi, Hoshangabad (MP).

(3) It is noted that in support of his request the PP has submitted the following documents

i. No Objection Certificate in the form of Notarised Affidavit submitted by Shri Raj Kumar Nema, OIC, Sub Off., M.P. State Mining Corporation Ltd., H.No. 12, Ward No. 17, Sainath Colony, Meenakshi, Hoshangabad (MP) for transfer of prior EC in the name of M/s Power Mech Projects Limited, Plot No. 248, Sector -2, Shakti Nagar, Habibganj, Bhopal (MP) – 462002.

ii. Notarised affidavit of M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh mentioning that no legal action/ credible action has been initiated against the mine till date and commitment to comply with all the standard and specific conditions stipulated in the prior EC issued.

iii. Copy of Prior EC issued by SEIAA vide L.No. 490/SEIAA/2018 dated 06.04.2016.

iv. Copy of Environmental Management Plan of M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh.

v. Copy of Approved Mining Plan of M M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh.

vi. Lease transfer order issued by Mineral Resource Department to M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh (MP) vide letter No. 486/132/2020/12/1Bhopal, dated 01.02.2021.

(4) It is noted that in EIA Notification 2006 as per Para-11 Transferability of Environmental Clearance (EC) there is a provision of transferring the EC.

Para-11 :- A prior environmental clearance granted for a specific project or activity to an applicant may be transferred during its validity to another legal person entitled to undertake the project or activity on application by the transferor, or by the transferee with a written “no objection” by the transferor, to, and by the regulatory authority concerned, on the same terms and conditions under which the prior

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 125 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

environmental clearance was initially granted, and for the same validity period. No reference to the Expert Appraisal Committee or State Level Expert Appraisal Committee concerned is necessary in such cases.

In context of above it seems that PP has submitted adequate documents to make the change in the name of PP as per EIA Notification 2006 (Para-11). Hence, prior EC issued by DEIAA on 06.04.2016 in the name of " Shri Raj Kumar Nema, OIC, Sub Off., M.P. State Mining Corporation Ltd., H.No. 12, Ward No. 17, Sainath Colony, Meenakshi, Hoshangabad (MP) is hereby transferred to M/s R.K. Transport & Constructions, 65-A Transport Nagar, District - Korba, Chhattisgarh for River Sand Quarry in an area of 20.200 ha. for production capacity of 4,50,000 cum/year at Khasra no. 167/1 (new 253) Village-Gujarwada, Tehsil-Babai, District-Hoshangabad (MP)." on the same terms & conditions and validity period under which the prior environmental clearance was initially granted. All concerned be informed accordingly.

64. Case No. 2470/2015, Prior Environment Clearance for Bhadawar Dolomite Mine in an area of 3.436 ha. for production capacity of 64,857 TPA at Village-Bhadawar, Tehsil-Murwara, Dist-Katni (MP) by Shri Himanshu Kothari, Executive Director, M/s S.N.S. (Minerals) Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP)- 485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

1. The Prior EC Letter for Mining Lease of Bhadawar Dolomite Mine Village-Bhadawar, Tehsil-Murwara, Dist-Katni (MP) granted to Shri Himanshu Kothari, Executive Director, M/s S.N.S. (Minerals) Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide Letter No. 5804/SEIAA/15 dated 26.09.2015.

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

4. That in compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 126 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there remains the same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 5804 dated 26.09.2015 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 5804 dated 26.09.2015 issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned.

65. Case No. 2466/2015, Prior Environment Clearance for Jamuni Khurd Limestone & Dolomite Mine in an area of 4.420 ha. for production capacity of 1,00,000 TPA at Village-Jamuani Khurd, Tehsil-Vijayraghogarh, Dist-Katni (MP) by M/s S.N.S. (Minerals) Ltd., Shri Himanshu Kothari, nominated Owner R/o N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP)-485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

1. The Prior EC Letter for Mining Lease of Jamuni Khurd Limestone & Dolomite Mine at Village-Jamuani Khurd, Tehsil-Vijayraghogarh, Dist-Katni (MP) granted to M/s S.N.S. (Minerals) Ltd., Shri Himanshu Kothari, nominated Owner R/o N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide Letter No. 1341/SEIAA/17 dated 14.12.2017.

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 127 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

4. That in compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there to remain the same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of the above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1341/SEIAA/17 dated 14.12.2017 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1341/SEIAA/17 dated 14.12.2017issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned.

66. Case No. 3769/2015, Prior Environment Clearance for approval of Limestone and Dolomite Mine in an area of 3.50ha. for production capacity of 88,710 TPA at Village-Jamuwani Kala, Tehsil-Vijayraghogarh, District-Katni (MP) by Shri Sanjiv Beri, (Owner), Managing Director, M/s S.N.S. (Minerals) Ltd., NH-7, Rewa Road, P.O. Maihar, District-Satna (MP)-485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

1. The Prior EC Letter for Mining Lease of Limestone and Dolomite Mine at Village-Jamuwani Kala, Tehsil-Vijayraghogarh, District - Katni (MP) granted to M/s S.N.S. (Minerals) Ltd., Shri Sanjiv Beri, (Owner), Managing Director, M/s S.N.S. (Minerals) Ltd., NH-7, Rewa Road, P.O. Maihar, District-Satna (MP) vide Letter No. 1956/SEIAA/18 dated 08.01.2019.

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 128 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

4. That in the compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there to remain the same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of the above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1956/SEIAA/18 dated 08.01.2019 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1956/SEIAA/18 dated 08.01.2019 issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned.

67. Case No. 3753/2015, Prior Environment Clearance for approval of Bhatoora Limestone Mine in an area of 4.047 ha for production capacity of 73,490 TPA at Village-Bhatoora, Tehsil-Maihar, District-Satna (MP) by M/s S.N.S. (Minerals) Ltd., Shri Sanjiv Beri, NH-7, Rewa Road, P.O. Maihar, District-Satna (MP)-485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

1. The Prior EC Letter for Mining Lease of Bhatoora Limestone Mine at Village-Bhatoora, Tehsil-Maihar, District-Satna (MP) granted to M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide Letter No. 1958/SEIAA/18 dated 08.01.2019.

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 129 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

4. That in compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there remains same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of the above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1958/SEIAA/18 dated 08.01.2019 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1958/SEIAA/18 dated 08.01.2019 issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned.

68. Case No. 489/2009, Prior Environment Clearance for approval of Jamuani Kala Limestone & Dolomite Mine in an area of 8.584 ha. for expansion in production capacity from 10,000 MTPA to 2,00,000 MTPA at Vill-Jamuani Kala Teh- Vijayraghogarh, Distt. - Katni (MP) by Shri Himanshu Kothari (ED), M/s S.N.S. (Minerals) Ltd., NH-7, Rewa Road, P.O. Maihar, District - Satna (MP) - 485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

1. The Prior EC Letter for Mining Lease of Bhatoora Limestone Mine at Village-Bhatoora, Tehsil-Maihar, District-Satna (MP) granted to M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide Letter No. 3380/SEIAA/15 dated 04.02.2015.

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 130 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

4. That in compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there to remain the same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of the above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 3380/SEIAA/15 dated 04.02.2015 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 3380/SEIAA/15 dated 04.02.2015 issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned.

69. Case No. 664/2012, Prior Environment Clearance for approval of Limestone mine 42.567ha. for enhancement in production capacity from 55,000 TPA to 5,00,000 TPA at Vill- Tamoria, Teh-Maihar, Distt. - Satna (MP) by Shri Himanshu Kothari, Executive Director, M/s S.N.S. (Minerals) Ltd., NH-7, Rewa Road, P.O. Maihar, District - Satna (MP) - 485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

1. The Prior EC Letter for Mining Lease of Bhatoora Limestone Mine at Village-Bhatoora, Tehsil-Maihar, District-Satna (MP) granted to M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide Letter No. 1431/SEIAA/14 dated 22.10.2014.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 131 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

4. That in compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there to remain the same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of the above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1431/SEIAA/14 dated 22.10.2014 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 1431/SEIAA/14 dated 22.10.2014 issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned.

70. Case No. 1726/2013, Prior Environmental Clearance for Jamuwani Khurd Limestone Mine of 7.89 ha. for production capacity of 2,00,000 TPA at Village - Jamuwani Khurd, Tehsil -Vijayraghogarh, District- Katni (MP) by M/s S.N.S. (Minerals) Ltd., Shri Himanshu Kothari, (ED), NH-7, Rewa Road, P.O. Maihar, District - Satna (MP) - 485771.

This is a case of amendment in the name of a company in the Prior EC Letter. Shri S.P. Tiwari, Director, M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide letter no. nil dated 22.03.2021 has informed that:

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

675th SEIAA Meeting dtd. 08.04.2021 Page 132 of 132

Minutes of the 675th Meeting of SEIAA dated 08.04.2021

1. The Prior EC Letter for Mining Lease of Bhatoora Limestone Mine at Village-Bhatoora, Tehsil-Maihar, District-Satna (MP) granted to M/s S.N.S. (Minerals) Pvt. Ltd., N.H.-7, Rewa Road, P.O. Maihar, Dist-Satna (MP) vide Letter No. 3165/SEIAA/16 dated 16.08.2016.

2. That the constitution of the company has changed form public limited to private limited and as such the name of the company has been changed form M/s S.N.S. (Minerals) Limited to S.N.S. (Minerals) Private Limited with due approval from shareholders and National Company Law Tribunal vide order dated 14.09.2018, thereafter the certificate of incorporation upon the change of name of the company has been issued by the registrar of companies, Kolkata dated 24.10.2018 and submitted a copy of NCLT order dated 14.09.2018 and C.O.I. dated 24.10.2018.

3. That on the request of PP and on the basis of due approval by Collector Katni and Satna, the Mineral Resource Department Govt. of Madhya Pradesh vide order no. 1879/1354/2019/12/2, dated 08.05.2020 changed the name of the company from M/S S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in all the mining leases granted in district Katni and Satna.

4. That in compliance to order of State Govt., the supplementary agreement executed on 25.11.2020 duly approved by Collector Satna and from that date lease holder's name in Mining leases changed from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited.

5. That no other change has occurred except the constitution of the company from public limited to private limited and the Board of Directors there to remain the same.

6. That undertaking for compliance of the EC conditions granted to M/s S.N.S. (Minerals) Limited is enclosed.

7. That no objection for change in name from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited is enclosed by Shri S.P. Tiwari, Director .N.S. (Minerals) Private Limited.

In view of above PP requested to amend the name of the company from M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 3165/SEIAA/16 dated 16.08.2016 issued by SEIAA.

The committee after detailed examination of information submitted by PP and discussion decided to amend the name of company M/s S.N.S. (Minerals) Limited to M/s S.N.S. (Minerals) Private Limited in the Prior EC Letter No. 3165/SEIAA/16 dated 16.08.2016 issued by SEIAA. The other terms and conditions of the EC letter shall remain the same. Copy to PP and all concerned

Meeting ended with a vote of thanks to the Chair.