(Tanvi Sundriyal) Member Secretary (R.K. Sharma) Member (Rakesh K. Shrivastava) Chairman 655 th SEIAA Meeting dtd.29.01.2021 Page 1 of 48 Minutes of the 655 th Meeting of SEIAA dated 29.01.2021 The 655 th meeting of the State Level Environment Impact Assessment Authority was convened on 29.01.2021 at the Authority's Office in Environmental Planning and Co- Ordination Organization (EPCO), Paryavaran Parisar, Bhopal. The meeting was chaired by Shri Rakesh K. Shrivastava, Chairman, SEIAA. The following members attended the meeting:- 1 Shri R.K. Sharma Member 2. Smt. Tanvi Sundriyal Member Secretary Following mining cases and other than mining cases have been considered:- S.No Case No. - . Category No. & date of latest SEAC & SEIAA meeting 1. 5669/2018 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 2. 7993/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 3. 7978/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 4. 7989/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 5. 8008/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 6. 8028/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 7. 7682/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 8. 6765/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 9. 6766/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 10. 8041/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 11. 8042/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 12. 8043/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 13. 8047/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 14. 8037/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 15. 8040/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 16. 8048/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 17. 8035/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 18. 8051/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 19. 8049/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 20. 8053/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 21. 6282/2019 1 (a) 473 rd SEAC meeting dtd. 07.01.2021 22. 5178/2016 1 (a) 474 th SEAC meeting dtd. 08.01.2021 23. 7044/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 24. 7910/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 25. 7911/2020 1 (a) 474 th SEAC meeting dtd. 08.01.2021 26. 7968/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 27. 7969/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 28. 7970/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 29. 7971/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 30. 7972/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 31. 7973/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 32. 7974/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 33. 7975/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 34. 7976/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 35. 8029/2020 1 (a) 471 st SEAC meeting dtd. 05.01.2021 36. 7708/2020 7(i) 472 nd SEAC meeting dtd. 06.01.2021 37. 8014/2020 1 (a) 472 nd SEAC meeting dtd. 06.01.2021 38. 8013/2020 1 (a) 472 nd SEAC meeting dtd. 06.01.2021 39. 8032/2020 1 (a) 473 rd SEAC meeting dtd. 07.01.2021

Transcript of Minutes of the 655th Meeting of SEIAA dated 29.01.2021

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 1 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

The 655th meeting of the State Level Environment Impact Assessment Authority was convened on 29.01.2021 at the Authority's Office in Environmental Planning and Co-Ordination Organization (EPCO), Paryavaran Parisar, Bhopal. The meeting was chaired by Shri Rakesh K. Shrivastava, Chairman, SEIAA. The following members attended the meeting:-

1 Shri R.K. Sharma Member 2. Smt. Tanvi Sundriyal Member Secretary

Following mining cases and other than mining cases have been considered:-

S.No Case No. - . Category No. & date of latest SEAC & SEIAA meeting 1. 5669/2018 1 (a) 473rd SEAC meeting dtd. 07.01.2021 2. 7993/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 3. 7978/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 4. 7989/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 5. 8008/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 6. 8028/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 7. 7682/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 8. 6765/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 9. 6766/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 10. 8041/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 11. 8042/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 12. 8043/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 13. 8047/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 14. 8037/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 15. 8040/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 16. 8048/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 17. 8035/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 18. 8051/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 19. 8049/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 20. 8053/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 21. 6282/2019 1 (a) 473rd SEAC meeting dtd. 07.01.2021 22. 5178/2016 1 (a) 474th SEAC meeting dtd. 08.01.2021 23. 7044/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 24. 7910/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 25. 7911/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 26. 7968/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 27. 7969/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 28. 7970/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 29. 7971/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 30. 7972/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 31. 7973/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 32. 7974/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 33. 7975/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 34. 7976/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 35. 8029/2020 1 (a) 471st SEAC meeting dtd. 05.01.2021 36. 7708/2020 7(i) 472nd SEAC meeting dtd. 06.01.2021 37. 8014/2020 1 (a) 472nd SEAC meeting dtd. 06.01.2021 38. 8013/2020 1 (a) 472nd SEAC meeting dtd. 06.01.2021 39. 8032/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 2 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

1. Case No. - 5669/2018 Prior Environment Clearance for Dolomite Mine in an area of 4.830 Ha. (51,101 ton per annum) (Khasra no. 278) at Vill. Lohani, Teh. Sausar, Dist. Chhindwara, (MP) by M/s Jigsun Alloys Pvt. Ltd, Plot No. 10, House No. 762, Tilaknagar, Dharampeth, Nagpur, MH-440010.

This case was recommended in 473rd SEAC Meeting dated 07.01.21 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting.

2. Case No. - 7993/2020 Prior Environment Clearance for Stone Quarry in an area of 2.0 ha. (51300 cum per annum) (Khasra No. 342/1, 342/2), Village - Akyaparwal, Tehsil - Jaora, Dist. Ratlam (MP) by Shree Khemraj S/o Shri Devisingh Gurjar, Village - Akyaparwal, Tehsil - Jaora, Dist. Ratlam, MP

This case was recommended in 473rd SEAC Meeting dated 07.01.21 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting.

40. 7956/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 41. 8006/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 42. 8007/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 43. 8025/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 44. 7995/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 45. 7996/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 46. 7964/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 47. 8031/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 48. 8021/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 49. 7997/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 50. 8022/2020 1 (a) 473rd SEAC meeting dtd. 07.01.2021 51. 8044/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 52. 8045/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 53. 8046/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 54. 8052/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 55. 7683/2020 1 (a) 474th SEAC meeting dtd. 08.01.2021 56. 7335/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 57. 7487/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 58. 7506/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 59. 7733/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 60. 7729/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 61. 7730/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 62. 7732/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 63. 7734/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 64. 7736/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 65. 7772/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 66. 7731/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 67. 7771/2020 1 (a) 643th SEIAA meeting dtd. 06.10.2020 68. 6097/2019 1 (a) 608th SEIAA meeting dtd. 04.05.2020 69. 6697/2019 1 (a) Corrigendum

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 3 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021 3. Case No. - 7978/2020 Prior Environment Clearance for Granite Quarry (Open cast

Manual / Semi Mechanized Method) in an area of 1.70 ha. (1830 cum per annum) (Khasra No. 854/1), Village - Bansiya, Tehsil - Chandla, Dist. Chhatarpur (MP) by M/s Good Luck Stone, Ward No. 10, Dixit Mohalla, Chandla, Dist. Chhatarpur, MP – 471525

This case was recommended in 473rd SEAC meeting dated 07.01.2021 and it was recorded that..........

“…………PP has submitted the response of above quarries same date vide letter dated 07.01.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 473rd SEAC meeting dated 07.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

V. No blasting shall be carried out in the ML area.

VI. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VII. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

IX. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP In remaining part of Khasra no. 854/1, Village - Bansiya covered under plantation programme in first three years. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

X. PP must ensure implementation of the following activities under CER.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 4 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic)

Development of grazing land.

Provide furniture's and water proofing of ceiling of old classrooms in Govt. Primary school, Village – Bansiya.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XI. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Granite Quarry (Open cast Manual / Semi Mechanized Method) in an area of 1.70 ha. (1830 cum per annum) (Khasra No. 854/1), Village - Bansiya, Tehsil - Chandla, Dist. Chhatarpur (MP) for the lease period to M/s Good Luck Stone, Ward No. 10, Dixit Mohalla, Chandla, Dist. Chhatarpur, MP – 471525.

4. Case No. - 7989/2020 Prior Environment Clearance for Stone Quarry (Open cast Manual / Semi Mechanized Method) in an area of 3.796 ha. (75000 cum per annum) (Khasra No. 2843/8, 2843/9/1, 2843/9/2, 2990/7, 2990/9), Village - Satai, Tehsil - Bijawar, Dist. Chhatarpur (MP) by M/s Shri Ramraj Stone Crusher, Partner, Smt. Pratibha Agrawal, 19, Basari Darwaza, Near Kamla Nehru School, Dist. Chhatarpur, MP - 471408

This case was recommended in 473rd SEAC meeting dated 07.01.2021 and it was recorded that..........

“…………The case was presented by the PP and their consultant wherein it was observed by the committee that a kachcha road in east side of the lease at a distance of 10 meters. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 473rd SEAC meeting dated 07.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 5 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary .PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

V. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VI. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VII. Total 6000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP In khasra no. 2829 and 2830 in Village- Satai, In barrier zone covered under plantation programme in first three years. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

VIII. PP must ensure implementation of the following activities under CER.

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic).

Development of grazing land.

Renovation and construction of boundary wall of Govt. Middle School, Village - Satai

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat

IX. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 6 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (Open cast Manual / Semi Mechanized Method) in an area of 3.796 ha. (75000 cum per annum) (Khasra No. 2843/8, 2843/9/1, 2843/9/2, 2990/7, 2990/9), Village - Satai, Tehsil - Bijawar, Dist. Chhatarpur (MP) for the lease period to M/s Shri Ramraj Stone Crusher, Partner, Smt. Pratibha Agrawal, 19, Basari Darwaza, Near Kamla Nehru School, Dist. Chhatarpur, MP – 471408.

5. Case No. - 8008/2020: Prior Environmental Clearance for Murrum Quarry (Opencast Manual/Semi Mechanized Method) in an area of 2.0 ha. for production capacity of 8000 cum per annum at Khasra No. 239/222 at Village - Shahpur, Tehsil - Huzur, Dist. Bhopal (MP) by Shri Raghvendra Singh Yadav S/o Shri Lakhan Singh Yadav, R/o, H.No. 122/260, Shiv Nagar Colony, Bhanpur Semra Saiyyad, Dist. Bhopal, MP – 462044.

This case was recommended in 473rd SEAC meeting dated 7.1.2021 and it was recorded that..........

"------------ PP has submitted the response of above quarries same date vide letter dated 07.01.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 473rd SEAC dated 7.1.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

V. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Gulmohar Amla etc. shall be planted in nearby land in part of Khasra no. 239/222 of Village –Shahpur, Tehsil - Huzur, Dist. Bhopal MP by PP under plantation programme in first three years. Consultation with DM at identified revenue land of the district. PP shall also explore and identify

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 7 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

the chunk of land in the area from revenue record to carry out plantation programme as proposed.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. PP must ensure implementation of the following activities under CER:

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic)

Development of grazing land.

Provide sports kits for Govt. middle school at Shahpur Village.

Provide furniture's for Govt. primary school at Shahpur Village.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

IX. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Murrum Quarry (Opencast Manual/Semi Mechanized Method) in an area of 2.0 ha. for production capacity of 8000 cum per annum at Khasra No. 239/222 at Village - Shahpur, Tehsil - Huzur, Dist. Bhopal (MP) for the lease period to Shri Raghvendra Singh Yadav S/o Shri Lakhan Singh Yadav, R/o, H.No. 122/260, Shiv Nagar Colony, Bhanpur Semra Saiyyad, Dist. Bhopal, MP – 462044.

6. Case No. - 8028/20 Prior Environmental Clearance for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.0 ha. for production capacity of 10000 cum per annum at Khasra No. 346, 347, Village - Enkhedi, Tehsil - Athner, Dist. - Betul, (MP) by Shri Amit Chandak S/o Shri Shyam Sunder Chandak, R/o, Devmali, Tehsil - Achalpur, Dist. Amrawati, Mah. - 444805, Email - amit[dot][email protected], Mobile - 9422156530.

This case was recommended in 473rd SEAC meeting dated 07.01.21 and it was recorded that..........

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 8 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

“------------The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Stone mining. During presentation it was observed that a Natural drain is in existence in the west side of the lease at a distance of >500 meter. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 473rd SEAC meeting dated 07.01.21, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

ii. PP shall not start mining activity before execution of lease agreement.

iii. The depth of the pit shall be as per the Approved Mining Plan.

iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

v. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP.

vi. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

vii. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Gulmohar, Sissoo, Amla, Chirol, Karanj, Amaltas, Munga, Chirol etc. shall be planted by PP in first three years under plantation programme in barrier zone eastern part, western part & southern part in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

viii. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

ix. PP must ensure implementation of the following activities in Enkhedi Village under CER as committed:

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic).

Development of grazing land.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 9 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Installation of water tank with electric pump/motor with pipe fittings for drinking water in Govt. Primary School of Enkhedi Village.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

x. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 2.0 ha. for production capacity of 10000 cum per annum at Khasra No. 346, 347, Village - Enkhedi, Tehsil - Athner, Dist. - Betul, (MP) for the lease period to Shri Amit Chandak S/o Shri Shyam Sunder Chandak, R/o, Devmali, Tehsil - Achalpur, Dist. Amrawati, Mah. - 444805, Email - amit[dot][email protected], Mobile - 9422156530.

7. Case No. - 7682/2020: Prior Environmental Clearance for Stone Quarry (Opencast Manual/Semi Mechanized Method in an area of 1.0 ha. for production capacity of 5088 cum per annum at Khasra No. 173/1/2/1/2, 173/1/2/2, 174/10, 174/11/2 at Village - Moya, Tehsil - Biora, Dist. Rajgarh, (MP) by Shri Omprakash Yadav, R/o Village - Moya, Tehsil - Biora, Dist. Rajgarh, MP – 465666.

This case was recommended in 473rd SEAC meeting dated 7.1.2021 and it was recorded that..........

"------------ PP has submitted the response of above quarries same date vide letter dated 07.012021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 473rd SEAC dated 7.1.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 10 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

V. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. Total 1500 saplings of suitable tree species i.e. Neem, Pipal,Bargad,Gulmohar Amla etc. shall be planted in nearby Khasra No. .122/k of Village – Moya, Tehsil - Biora, Dist. Rajgarh MP by PP in under plantation programme in first three years in consultation with DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. PP must ensure implementation of the following activities under CER:

Provide sports kits for Govt. School in the village Moya.

Development of Grazing land.

Provide infrastructure / community hall with its maintenance in village Moya.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

IX. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA

Hence, Prior Environmental Clearance is granted for Stone Quarry (Opencast Manual/Semi Mechanized Method in an area of 1.0 ha. for production capacity of 5088 cum per annum at Khasra No. 173/1/2/1/2, 173/1/2/2, 174/10, 174/11/2 at Village - Moya, Tehsil - Biora, Dist. Rajgarh, (MP) for the lease period to Shri

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 11 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Omprakash Yadav, R/o Village - Moya, Tehsil - Biora, Dist. Rajgarh, MP – 465666.

8. Case No. - 6765/2020 Prior Environment Clearance for Stone Quarry (Open cast Manual / Semi Mechanized Method) in an area of 2.20 ha. (29,998 cum per annum) (Khasra No. 2307), Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur (MP) by Smt. Reeta Singh, Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur, MP.

1. This is a project pertaining to mining of Stone Quarry in MLA of 2.20 ha The activity is mentioned at S.No. 1 (a) of the Schedule of EIA Notification 2006 as amended from time to time. The project is reported to be at a distance of more than 10 km from National park and sanctuary etc. thus it is not attracted by the general conditions and considered under category ‘B-1” by virtue of its location and mining lease area. The case was forwarded by SEIAA to SEAC for appraisal of EIA for environment clearance for the project. It was submitted that this is a proposed mine with production capacity of Stone Quarry is 29,998 cum / year.

2. It was noted that PP has submitted a copy of approved Mining Plan, DSR report, information in the lease’s within 500 meters radius around the site and other requisite information in the prescribed format duly verified in the Nayab Tehsildar letter No. 162 dated: 03/01/2020 has reported that there are 01 more mines operating or proposed within 500 meters around the said mine total area of 12.20 ha., including this mine.

3. SEAC in its 474th SEAC meeting dtd 08.01.2021 has recommended the case with 36 special conditions for issuance of EC.

4. The proposed plantation programme was examined and it was found that 3740 sapling of tree species shall be covered under plantation.

5. It was noted that as per Divisional Forest Officer, Letter no. 4917 dtd. 24.12.2018, the National Park/Sanctuary are not located within 10 Km., radius from the mining site. Hence, the General Conditions are not attracted.

6. It was noted that the water requirement is 5 KLD (3KLD for Dust Suppression + 0.5 KLD for Domestic + 1.5 KLD for Green Belt) which shall be met from Tanker

7. It was also noted that the Public Hearing was carried out on 06.11.2020 at near project site in Prakash Bamhauri, Tehsil- Gaurihar, District Chhatrapur, State-Madhya Pradesh under Chairmanship of Deputy Collector, Chhatrapur..

After detailed discussions and perusal of recommendations of 471st SEAC meeting dated 05.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 12 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season..

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP

VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

IX. Total 3740 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP at Mine lease boundary & in khasra no. 2310 covered under plantation programme in five years. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed

X. PP must ensure implementation of the following activities under CER.

Installation of water filters (1 Number) with five year maintenance in Govt., school Prakash Bamhauri.

Repairing & white wash (03 Rooms) of school building of Prakash Bamhauri.

Installation a hand pump (1 Numbers) at village common area at village Prakash Bamhauri.

Development of grazing land in the village area (Charnoi Bhoomi)..

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XI. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 13 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (Open cast Manual / Semi Mechanized Method) in an area of 2.20 ha. (29,998 cum per annum) (Khasra No. 2307), Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur (MP) for the lease period to Smt. Reeta Singh, Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur, MP.

9. Case No. - 6766/2020 Prior Environment Clearance for Stone Quarry (Open cast Manual / Semi Mechanized Method) in an area of 1.117 ha. (30,000 cum per annum) (Khasra No. 2303), Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur (MP) by Shri Yogendra Singh, Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur, MP.

1. This is a project pertaining to mining of Stone Quarry in MLA of 1.117 ha The activity is mentioned at S.No. 1 (a) of the Schedule of EIA Notification 2006 as amended from time to time. The project is reported to be at a distance of more than 10 km from National park and sanctuary etc. thus it is not attracted by the general conditions and considered under category ‘B-1” by virtue of its location and mining lease area. The case was forwarded by SEIAA to SEAC for appraisal of EIA for environment clearance for the project. It was submitted that this is a proposed mine with production capacity of Stone Quarry is 30,000 cum per annum.

2. It was noted that PP has submitted a copy of approved Mining Plan, DSR report, information in the lease’s within 500 meters radius around the site and other requisite information in the prescribed format duly verified in the Collector Office letter No. 20 dated: 02/01/2020 has reported that there are 07 more mines operating or proposed within 500 meters around the said mine total area of 18.617 ha., including this mine.

8. SEAC in its 474th SEAC meeting dtd 08.01.2021 has recommended the case with 36 special conditions for issuance of EC.

9. The proposed plantation programme was examined and it was found that 1900 sapling of tree species shall be covered under plantation.

10. It was noted that as per Divisional Forest Officer, Letter no. 533 dtd. 13.02.2019, the National Park/Sanctuary are not located within 10 Km., radius from the mining site. Hence, the General Conditions are not attracted.

11. It was noted that the water requirement is 3 KLD (1.75 KLD for Dust Suppression + 0.75 KLD for Domestic + 0.50 KLD for Green Belt) which shall be met from Tanker

12. It was also noted that the Public Hearing was carried out on 06.11.2020 at near project site in Prakash Bamhauri, Tehsil- Gaurihar, District Chhatrapur, State-Madhya Pradesh under Chairmanship of Deputy Collector, Chhatrapur..

After detailed discussions and perusal of recommendations of 474th SEAC meeting dtd 08.01.2021, presentation made by the PP in SEIAA, it was decided

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 14 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season..

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP

VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

IX. Total 1900 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP at Mine lease boundary & in khasra no.- 2310 covered under plantation programme in first three years. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed

X. PP must ensure implementation of the following activities under CER.

Distribution of sports kit for students and provide black board (3 Numbers), Table & Benches – 10 Numbers in Govt. school of Prakash Bamhauri.

Renovation of Aganwadi School (1 room) in village Prakash Bamhauri.

Construction of community hall (100 sqm) at village Prakash Bamhauri.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 15 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

XI. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (Open cast Manual / Semi Mechanized Method) in an area of 1.117 ha. (30,000 cum per annum) (Khasra No. 2303), Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur (MP) for the lease period to Shri Yogendra Singh, Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur, MP.

10. Case No. - 8041/20 Prior Environmental Clearance for Sand Quarry in an area of 5.0 ha. for production capacity of 67500 cum per annum at Khasra No. 358, Village - Muaar, Tehsil - Gadarwara, Dist. - Narsinghpur, (MP) by M/s Dhanlaxmi Marchendais Pvt. Ltd, Shri Samar Singh Tomar, Director, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. - Hoshangabad, MP - 461001, Email – [email protected], Mobile - 7869932222.

This case was recommended in 474th SEAC meeting dated 08.01.21 and it was recorded that..........

“------------The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining on the river Dudhi. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.21, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

IV. The entire lease area should be properly fenced and boundary stones marked at the site.

V. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VI. The depth of the pit shall be as per Approved Mining Plan.

VII. No transportation shall be permitted within the village.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 16 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

VIII. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

IX. Total 7500 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Gulmohar, Sissoo, Kathal, Guava etc. shall be planted by PP in first two years under plantation programme at Khasra No. 123/1 in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

X. Over loading will be strictly prohibited.

XI. Water sprinkling will be done on the approach road on the regular basis.

XII. PP must ensure the implementation of following in Village – Muaar under CER as committed:

Development of grazing land.

Repairing & renovation of Govt. Primary School at village Muaar.

Provide water filter at Govt. Primary School at village Muaar.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XIII. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry in an area of 5.0 ha. for production capacity of 67500 cum per annum at Khasra No. 358, Village - Muaar, Tehsil - Gadarwara, Dist. - Narsinghpur, (MP) for the lease period to M/s Dhanlaxmi Marchendais Pvt. Ltd, Shri Samar Singh Tomar, Director, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. - Hoshangabad, MP - 461001.

11. Case No. - 8042/20 Prior Environmental Clearance for Sand Quarry in an area of 5.0 ha. for production capacity of 67500 cum per annum at Khasra No. 634, Village - Saikheda, Tehsil - Gadarwara, Dist. - Narsinghpur, (MP) by M/s Dhanlaxmi Marchendais Pvt. Ltd, Shri Samar Singh Tomar, Director, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. - Hoshangabad, MP - 461001, Email – [email protected], Mobile - 7869932222.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 17 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

This case was recommended in 474th SEAC meeting dated 08.01.21 and it was recorded that..........

“------------The case was presented by the PP and their consultant. PP stated that this is a case of river sand mining on the river Dudhi. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.21, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

IV. The entire lease area should be properly fenced and boundary stones marked at the site.

V. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VI. The depth of the pit shall be as per Approved Mining Plan.

VII. No transportation shall be permitted within the village.

VIII. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

IX. Total 7500 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Gulmohar, Sissoo, Kathal, Guava Gulmohar, Saptparni etc. shall be planted by PP in first two years under plantation programme at Khasra No. 198,482, Village- Saikheda, Tehsil- Gadarwara, Dist.- Narsinghpur MP in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

X. Over loading will be strictly prohibited.

XI. Water sprinkling will be done on the approach road on the regular basis.

XII. PP must ensure the implementation of following activities with separate budget provision in village - Saikheda under CER as committed:

Development of grazing land

Repairing & renovation of Govt. Primary School Saikheda

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 18 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XIII. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry in an area of 5.0 ha. for production capacity of 67500 cum per annum at Khasra No. 634, Village - Saikheda, Tehsil - Gadarwara, Dist. - Narsinghpur, (MP) for the lease period to M/s Dhanlaxmi Marchendais Pvt. Ltd, Shri Samar Singh Tomar, Director, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. - Hoshangabad, MP - 461001.

12. Case No. - 8043/20 Prior Environmental Clearance for Sand Quarry (opencast manual method) in an area of 5.0 ha. for production capacity of 67500 cum per annum at Khasra No. 103, Village - Dharampuri, Tehsil - Kareli, Dist. - Narsinghpur, (MP) by M/s Dhanlaxmi Marchendais Pvt. Ltd, Shri Samar Singh Tomar, Director, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. - Hoshangabad, MP - 461001, Email – [email protected], Mobile - 7869932222.

This case was recommended in 474th SEAC meeting dated 08.01.21 and it was recorded that..........

“------------The case was presented by the PP and their consultant, during presentation PP stated that this is a case of river sand mining on Narmada River wherein the method of mining will be open cast manual. During presentation as per Google image based on coordinates provided by PP, it was observed that the part of lease is under submergence, for which PP submitted that in the mine plan they have already left 40% area as non mining area due to submergence. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.21, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 19 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

III. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

IV. The entire lease area should be properly fenced and boundary stones marked at the site.

V. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VI. Leaving the submerged area as non-mining zone as committed in SEAC.

VII. The depth of the pit shall be as per Approved Mining Plan.

VIII. No transportation shall be permitted within the village.

IX. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

X. Total 7500 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Gulmohar, Sissoo, Kadam, Kathal, Gulmohar etc. shall be planted by PP in first two years under plantation programme at Khasra No. 57/1 & 57/2 at Village - Dharampuri, Tehsil - Kareli, Dist.- Narsinghpur (MP) in consultation with Gram Panchayat/ District Administration. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

XI. Over loading will be strictly prohibited.

XII. Water sprinkling will be done on the approach road on the regular basis.

XIII. PP must ensure the implementation of following activities in Village - Dharampuri under CER as committed:

Development of grazing land

Repairing & renovation of govt. middle School Dharampuri

Development of play ground near govt. middle school

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XIV. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 20 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (opencast manual method) in an area of 5.0 ha. for production capacity of 67500 cum per annum at Khasra No. 103, Village - Dharampuri, Tehsil - Kareli, Dist. - Narsinghpur, (MP) for the lease period to M/s Dhanlaxmi Marchendais Pvt. Ltd, Shri Samar Singh Tomar, Director, 501/pi/1, Ward No. 16, Civil Line, Kalika Nagar, Babai Road, Dist. - Hoshangabad, MP - 461001.

13. Case No. - 8047/2020: Prior Environmental Clearance for Sand Quarry (opencast manual method) in an area of 5.0 ha. for production capacity of 13500 cum per annum at Khasra No. 582, 1176 at Village - Daikhal, Tehsil - Anuppur, Dist. Anuppur, (MP) by M/s K.G.Developers, C-99, New Minal Residency, J.K.Road, Dist. Bhopal, MP – 462023.

This case was recommended in 474th SEAC meeting dated 8.1.2021 and it was recorded that..........

"------------ The case was presented by the PP and their consultant, during presentation PP stated that this is a case of river sand mining on Godhan River which is tributary of River Tepan . During presentation as per Google image based on coordinates sprovided by PP, it was observed that the lease is in two part for which PP submitted that due to kachha road safety margin is left and thus lease is in two parts. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 8.1.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

i. PP shall not start mining activity before execution of lease agreement.

ii. The production capacity shall be limited to the quantity as recommended by SEAC.

iii. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

iv. The entire lease area should be properly fenced and boundary stones marked at the site.

v. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

vi. The depth of the pit shall be as per Approved Mining Plan.

vii. No transportation shall be permitted within the village.

viii. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 21 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

ix. Total 2500 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Guava, Imli, Kathal, Jamun etc. shall be planted by PP In identified area with the help of Gram Panchayt at, Khasra no.55, Village- Daikhal and Along River Bank in zigzag manner area under plantation programme in first two years in consultation with DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

x. Over loading will be strictly prohibited.

xi. Water sprinkling will be done on the approach road on the regular basis.

xii. PP must ensure the implementation of following activities under CER as committed:

Development of grazing land at village Daikhal.

Construction of pucca road from main road to village entrance at village Daikhal.

Repairing and whitewash work of community hall in village Daikhal.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

xiii. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry (opencast manual method) in an area of 5.0 ha. for production capacity of 13500 cum per annum at Khasra No. 582, 1176 at Village - Daikhal, Tehsil - Anuppur, Dist. Anuppur, (MP) for the lease period to M/s K.G.Developers, C-99, New Minal Residency, J.K.Road, Dist. Bhopal, MP – 462023.

14. Case No. - 8037/2020 Prior Environment Clearance for Soil/Murrum Quarry (Open cast manual method) in an area of 1.0 ha. (16640 cum per annum) (Khasra No. 2476), Village - Sabakheda, Tehsil - Mandsaur, Dist. Mandsaur, (MP) by Shri Arun Carpenter, Village - Bilod, Tehsil - Malhargarh, DIst. Mandsaur, MP - 458001 (Temporary Permit)

This case was recommended in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 22 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

“…………The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Soil/ Murrum mining. PP stated that this lease was obtained under temporary permit (TP) with 01 year validity & the method of mining will be open cast manual, where no drilling and blasting is proposed only excavator shall be used . During presentation it was observed by committee that a pucca road is in exist ace at a distance of 50 meters, in the south – west side. PP further submitted that no crusher is proposed in the lease area. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. Total 1500 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP in one year at Sabakheda Village area – 1300 nos at government land in village area at remaining part of Khasra no 1 in consultation with village local gram panchayat and mine lease boundary covered under plantation programme. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

IX. PP must ensure implementation of the following activities under CER.

Repairing, whitewash including installation of doors & window of classrooms of govt. middle school building in village Sabakheda.

Construction of its new toilet with proper overhead water supply connection in govt. middle school at village Sabakheda.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 23 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat

X. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Soil/Murrum Quarry (Open cast manual/ semi mechanized method) in an area of 1.0 ha. (16640 cum per annum) (Khasra No. 2476), Village - Sabakheda, Tehsil - Mandsaur, Dist. Mandsaur, (MP) for the lease period to Shri Arun Carpenter, Village - Bilod, Tehsil - Malhargarh, DIst. Mandsaur, MP - 458001 (Temporary Permit)

15. Case No. - 8040/2020 Prior Environment Clearance for Murrum Quarry (Open cast manual / semi mechanized method) in an area of 4.0 ha. (8000 cum per annum) (Khasra No. 38), Village - Bodani, Tehsil - Ujjain, Dist. Ujjain, (MP) by Shri Rohan Pratap Singh,R/o- B-1/12, Mahakal Vanijya Nagar, Nanakhedi, Dist. Ujjain, MP – 456010

This case was recommended in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“…………The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Murrum thus no blasting is proposed. A Kachcha road crossing the lease PP submitted this is a haulage road is for mining purpose. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 24 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary .

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. Total 7200 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP In khasra No. 31 & around mine lease boundary in consultation with local gram panchayat / DM under plantation programme within three years at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

IX. PP must ensure implementation of the following activities under CER.

Reparing & renovation of Govt. Primary School, Bodani, Ujjain .

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat

X. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Murrum Quarry (Open cast manual / semi mechanized method) in an area of 4.0 ha. (8000 cum per annum) (Khasra No. 38), Village - Bodani, Tehsil - Ujjain, Dist. Ujjain, (MP) for the lease period to Shri Rohan Pratap Singh,R/o- B-1/12, Mahakal Vanijya Nagar, Nanakhedi, Dist. Ujjain, MP – 456010.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 25 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021 16. Case No. - 8048/2020 Prior Environment Clearance for Stone Quarry (Opencast

Manual/Semi Mechanized Method) in an area of 2.0 ha. (40000 cum per annum) (Khasra No. 33/2, 33/3, 34/1, 34/2), Village - Sirsodiya, Tehsil - Kannod, Dist. Dewas, (MP) by Shri Karan Agrawal S/o Shri Rajesh Agrawal, R/o, Itwara Bazar, Timarni, Dist. Harda, MP

This case was recommended in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“…………PP has submitted the response of above quarries same date vide letter dated 08.01.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’::

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary .

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. Total 2400 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP under plantation programme in first three years. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

IX. PP must ensure implementation of the following activities under CER.

Distribution of sport kit to students in nearby villages,

Renovation of govt school building,

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 26 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Repairing & renovation of public toilet in nearby villages,

Medical camps for villagers & covid awareness camps (1- year)

Development of grazing land.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat

X. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (Opencast Manual/Semi Mechanized Method) in an area of 2.0 ha. (40000 cum per annum) (Khasra No. 33/2, 33/3, 34/1, 34/2), Village - Sirsodiya, Tehsil - Kannod, Dist. Dewas, (MP) for the lease period to Shri Karan Agrawal S/o Shri Rajesh Agrawal, R/o, Itwara Bazar, Timarni, Dist. Harda, MP

17. Case No. - 8035/2020: Prior Environmental Clearance for Murrum Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 4000 cum per annum at Khasra No. 281 at Village - Gamakhar, Tehsil - Basoda, Dist. Vidisha, (MP) by Shri Anuj Sharma S/o Shri Omkar Prasad Sharma, R/o Tehsil - Basoda,, DIst. Vidisha, MP – 464221.

This case was recommended in 474th SEAC meeting dated 8.1.2021 and it was recorded that..........

"------------ The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Murrum thus no blasting is proposed. A pucca road is in existence in the north – west side of >200 meter distance. Also, in the south –west side of the lease at >350 meter in the SW direction, FCI godown are situated. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC dated 8.1.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 27 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

V. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. Total 1500 saplings of suitable tree species i.e. Neem, Pipal,Bargad,Gulmohar Amla etc. shall be planted in nearby Khasra No. 283/1 of Village – Gamakhar, Tehsil - Basoda, Dist. Vidisha MP by PP under plantation programme in first three years in consultation with DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. PP must ensure implementation of the following activities under CER:

Repairing and whitewash of govt. primary school building in village Gamakhar.

Renovation & whitewash in anganwadi at Gamakhar village

Provide basic school furniture and other necessary items as needed in village Gamakhar.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

IX. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 28 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Hence, Prior Environmental Clearance is granted for Murrum Quarry (Opencast Manual/Semi Mechanized Method in an area of 1.0 ha. for production capacity of 4000 cum per annum at Khasra No. 281 at Village - Gamakhar, Tehsil - Basoda, Dist. Vidisha, (MP) for the lease period to Shri Anuj Sharma S/o Shri Omkar Prasad Sharma, R/o Tehsil - Basoda,, DIst. Vidisha, MP – 464221.

18. Case No. - 8051/2020: Prior Environmental Clearance for Stone Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 5586 cum per annum at Khasra No. 25/1/2 at Village - Kasba Sironj, Tehsil - Sironj, Dist. Vidisha, (MP) by M/s L.N.B. Construction Company, Prop. Shri Ashish Bhargawa, R/o Tehsil -Sironj, Tehsil - Sironj, DIst. Vidisha, MP – 464228.

This case was recommended in 474th SEAC meeting dated 8.1.2021 and it was recorded that..........

"------------ PP has submitted the response of above quarries same date vide letter dated 08.01.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC dated 8.1.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary.

V. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. Total 1700 saplings of suitable tree species i.e. Neem, Pipal,Bargad,Gulmohar Amla etc. shall be planted in nearby Khasra No. 21 of Village – Kasba Sironj, Tehsil - Sironj, Dist. Vidisha, MP by PP in first three Year under plantation programme in consultation with DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 29 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

VIII. PP must ensure implementation of the following activities under CER:

Construction of two class room in Govt. Primary School and repairing & whitewash of govt. primary school building at village Kasba Sironj.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aanganwadies of above villages. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

IX. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA

Hence, Prior Environmental Clearance is granted for Stone Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 5586 cum per annum at Khasra No. 25/1/2 at Village - Kasba Sironj, Tehsil - Sironj, Dist. Vidisha, (MP) for the lease period to M/s L.N.B. Construction Company, Prop. Shri Ashish Bhargawa, Sironj, Tehsil - Sironj, DIst. Vidisha, MP – 464228.

19. Case No. - 8049/2020 Prior Environment Clearance for Murrum Quarry (opencast manual/semi mechanized method) in an area of 1.90 ha. (2000 cum per annum) (Khasra No. 91), Village - Nagda, Tehsil - Dewas, Dist. Dewas, (MP) by M/s Dutt Kripa Traders, Prop. Shri Fateh Singh S/o Shri Vishwas Rao, R/o, 73, Anand Bagh, Tehsil & Dist. Dewas, MP – 455111.

This case was recommended in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“…………The case was presented by the PP and their consultant wherein it was observed by the committee that it’s a case of Murrum thus no blasting is proposed during presentation as per Google image based on coordinates provided by PP, it was observed that the lease area is already excavated. PP submitted that it is very old pit excavated since year 2007 and they have got the lease in such condition and this pit has shown on surface map. Within lease crusher is also installed. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:::

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 30 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary .

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

VIII. Total 3000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Imli etc. shall be planted by In remaining part of khasra no. 91, and in barrier zone cover under plantation programme in first three years in consultation with Gram Panchayat & DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed

IX. PP must ensure implementation of the following activities under CER.

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic).

Development of grazing land.

Construction of boundary wall of Govt. Primary school, Nagda village.

Repairing of walls and doors of Govt. Primary school, Nagda village

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat

X. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 31 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Murrum Quarry (opencast manual/semi mechanized method) in an area of 1.90 ha. (2000 cum per annum) (Khasra No. 91), Village - Nagda, Tehsil - Dewas, Dist. Dewas, (MP) for the lease period to M/s Dutt Kripa Traders, Prop. Shri Fateh Singh S/o Shri Vishwas Rao, R/o, 73, Anand Bagh, Tehsil & Dist. Dewas, MP – 455111

20. Case No. - 8053/2020 Prior Environment Clearance for Stone Quarry (opencast manual/semi mechanized method) in an area of 3.950 ha. (25251 cum per annum) (Khasra No. 158/2/Kha), Village - Sili, Tehsil - Gunaur, Dist. Panna, (MP) by Shri Vikram Pratap Singh, Kunjvan, Tehsil & Dist. Panna, MP - 488001

This case was recommended in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“…………PP has submitted the response of above quarries same date vide letter dated 08.01.2021, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP.

II. PP shall not start mining activity before execution of lease agreement.

III. The depth of the pit shall be as per the Approved Mining Plan.

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary .

V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season.

VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 32 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

VIII. Total 6000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Amaltas, Drumstick etc. shall be planted by PP in Khasra Number 158/2 Kha- and approach road,, mine lease boundary e.t.c covered under plantation programme in first three years. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed.

IX. PP must ensure implementation of the following activities under CER.

Repairing & renovation of Govt. school building in village Sili.

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat

X. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast manual/semi mechanized method) in an area of 3.950 ha. (25251 cum per annum) (Khasra No. 158/2/Kha), Village - Sili, Tehsil - Gunaur, Dist. Panna, (MP) for the lease period to Shri Vikram Pratap Singh, Kunjvan, Tehsil & Dist. Panna, MP – 488001

21. Case No. - 6282/2019 Prior Environment Clearance for Crusher Stone Quarry in an area of 4.00 ha. (39,049 cum per annum) (Khasra No. 364), Village - Chandbad Kadeem, Tehsil - Berasia, Dist. Bhopal (MP) by M/s Narmada Minerals, Shri Shushil Rai, 33, Swastik Sadar Bazar, Dist. Jabalpur, MP – 482001

This case was discussed in 473rd SEAC meeting dated 07.01.2021 and it was recorded that..........

“………….The case was scheduled for presentation, but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Earlier PP was also absent in SEAC meeting 469th SEAC meeting dated 17/12/20 & 466th SEAC meeting dated 26-11-20. Committee decided that since sufficient opportunities has been given to the PP for appraisal of their case but PP remains absent thus committee decided that case shall be returned to SEIAA for delisting assuming that PP is not interested to continue with the project..”

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 33 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021 22. Case No. - 5178/16 Prior Environment Clearance for Padrehi Limestone Mine in an

area of 1.732 ha. (55,000 TPA) at Khasra No.-97, Village-Padrehi,Tehsil-Vijayraghogarh, DistrictKatni (MP) by Shri Ramnaresh Jaiswal C/o Shri Sharda Prasad Jaiswal, Kawasji Ward, Near Vivekanand Chowk, Post-ACC, District-Katni (MP)-483504.

This case was discussed in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“………….The case was scheduled for presentation, but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Earlier PP was also absent in SEAC meeting 420th SEAC meeting dated 27/01/2020 , 413 SEAC meeting dated 10-12-19 & 406th SEAC meeting dated 25-11-2019. Committee decided that since sufficient opportunities has been given to the PP for appraisal of their case but PP remains absent thus committee decided that case shall be returned to SEIAA for delisting assuming that PP is not interested to continue with the project..”

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

23. Case No. - 7044/2020 Prior Environment Clearance for ISP - Kalisindh Micro Lift Irrigation Scheme Phase II at Tehsil - Punasa, Dist. Khandwa (M.P.). GCA-1,37177 Ha., CCA 1,00,000 to 1,10,000 ha. (No. of benefited villages 175 to 265). By Executive Engineer, Office of the Executive Engineer, Narmada Development Division No. 20, Mandleshwar, Dist. Khargone, (M.P.).

This case was discussed in 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“………….The case was scheduled for presentation, but neither the Project Proponent (PP) nor his representative was present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Earlier PPwas also absent in 468th SEAC meeting dated 16/12/2020 & 466th SEAC meeting dated 26/11/2020. Committee decided that since sufficient opportunities has been given to the PP for appraisal of their case but PP remains absent thus committee decided that case shall be returned to SEIAA for delisting assuming that PP is not interested to continue with the project..”

As per above observation of SEAC, it has been decided to delist the case on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

24. Case No. - 7910/2020 Prior Environment Clearance for Sand Quarry in an area of 3.520 ha. for production capacity of 13000 cum per annum (as recmmended by SEAC) at Khasra No. 128 at Village - Morra, Tehsil - Bada Malhara, Dist. Chhatarpur (MP) by M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Tal Darwaza, Dist. Tikamgarh, MP

This case was recommended in 467th SEAC meeting dated 08.12.2020 & 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 08.01.2021, which was placed before the committee and the same found satisfactory. Committee observed that even after deducting the volume of sand in the submerged area, the sanctioned volume of sand can be evacuated from the available dry area as per the

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 34 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

revised plan submitted by PP. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

IV. The entire lease area should be properly fenced and boundary stones marked at the site.

V. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VI. Leaving the submerged area as non-mining zone as committed in SEAC.

VII. The depth of the pit shall be as per Approved Mining Plan.

VIII. No transportation shall be permitted within the village.

IX. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

X. Total 6000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Karanj, Jamun etc. shall be planted by PP In identified area with the help of Gram Panchayat, Khasra no. 479, Village-Morra & Along River Bank in zigzag manner and in dump or mineral stacked area under plantation programme in consultation with DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed

XI. Over loading will be strictly prohibited.

XII. Water sprinkling will be done on the approach road on the regular basis.

XIII. PP must ensure the implementation of following activities under CER:

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic).

Development of grazing land. (1st Year)

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 35 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Reparing & whitewash of old classrooms in Govt. Primary school at Devoran Village (2nd & 3rd Year).

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

XIV. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry in an area of 3.520 ha. for production capacity of 13000 cum per annum (as recmmended by SEAC) at Khasra No. 128 at Village - Morra, Tehsil - Bada Malhara, Dist. Chhatarpur (MP) for the lease period to M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Tal Darwaza, Dist. Tikamgarh, MP.

25. Case No. - 7911/2020 Prior Environment Clearance for Sand Quarry in an area of 4.0 ha. for production capacity of 15000 cum per annum (as per SEAC remmendation) at Khasra No. 818 at Village - Surajpur, Tehsil - Chandla, Dist. Chhatarpur (MP) by M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Tal Darwaza, Dist. Tikamgarh, MP

This case was recommended in 467th SEAC meeting dated 08.12.2020 & 474th SEAC meeting dated 08.01.2021 and it was recorded that..........

“------------PP has submitted the response of above quarries same date vide letter dated 08.01.2021, which was placed before the committee and the same found satisfactory. Committee observed that even after deducting the volume of sand in the submerged area, the sanctioned volume of sand can be evacuated from the available dry area as per the revised plan submitted by PP. The mining shall be done as per the approved mine plan by concerned DGMs. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 474th SEAC meeting dated 08.01.2021, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:-

I. PP shall not start mining activity before execution of lease agreement.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 36 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

II. The production capacity shall be limited to the quantity as recommended by SEAC.

III. No ramp will be allowed within the river basin to transport sand to the other bank. Transportation will be allowed on the bank side where the mineral is being excavated.

IV. The entire lease area should be properly fenced and boundary stones marked at the site.

V. No in-stream mining shall be allowed. The local authorities should ensure that the mining activity is confined only in the dry portion where sand is exposed.

VI. Leaving the submerged area as non-mining zone as committed in SEAC.

VII. The depth of the pit shall be as per Approved Mining Plan.

VIII. No transportation shall be permitted within the village.

IX. Alternate transportation route should be decided in consultation with the local Gram Panchayat.

X. Total 6000 saplings of suitable tree species i.e. Neem, Pipal, Bargad, Mango, Amla, Karanj, Jamun etc. shall be planted by PP In identified area with the help of Gram Panchayat, Khasra no. 814,813, Village- Surajpur & Along River Bank in zigzag manner and in dump or mineral stacked area under plantation programme in consultation with DM at identified revenue land of the district. PP shall also explore and identify the chunk of land in the area from revenue record to carry out plantation programme as proposed

XI. Over loading will be strictly prohibited.

XII. Water sprinkling will be done on the approach road on the regular basis.

XIII. PP must ensure the implementation of following activities under CER:

Distribution of masks & sanitizers to villagers and to conduct awareness program through Panchayat for the protection from the spread of Corona virus (COVID 19 Pandemic).

Development of grazing land . (1st Year)

Reparing & whitewash of old classrooms in Govt. Primary school of Surajpur Village (2nd & 3rd Year)

PP shall ensure contribution of funds on behalf of village under Jal Jeewan Mission in consultation with Janpad Panchayat and PHED. PP shall give preference to develop/provide infrastructural facilities in schools or aganwadies of above villages The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 37 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

XIV. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

Hence, Prior Environmental Clearance is granted for Sand Quarry in an area of 4.0 ha. for production capacity of 15000 cum per annum (as per SEAC remmendation) at Khasra No. 818 at Village - Surajpur, Tehsil - Chandla, Dist. Chhatarpur (MP) for the lease period to M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Tal Darwaza, Dist. Tikamgarh, MP.

26. Case No. - 7968/2020 Shri Rasmeet Singh Malhotra S/o Shri Ajeet Singh Malhotra, Near Alka Talkies, Nehru Ward, Pipariya, Dist. Hoshangabad, MP - 461775 Prior Environment Clearance for Sand Quarry in an area of 10.0 ha. (75000 cum per annum) (Khasra No. 01), Village - Udaipur, Tehsil - Ajaygarh, Dist. Panna (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

27. Case No. - 7969/2020 Shri Rasmeet Singh Malhotra S/o Shri Ajeet Singh Malhotra, Near Alka Talkies, Nehru Ward, Pipariya, Dist. Hoshangabad, MP - 461775 Prior Environment Clearance for Sand Quarry in an area of 5.20 ha. (10000 cum per annum) (Khasra No. 01), Village - Mohar Kakra, Tehsil - Raipura, Dist. Panna (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

28. Case No. - 7970/2020 Shri Rasmeet Singh Malhotra S/o Shri Ajeet Singh Malhotra, Near Alka Talkies, Nehru Ward, Pipariya, Dist. Hoshangabad, MP - 461775 Prior Environment Clearance for Sand Quarry in an area of 7.50 ha. (120000 cum per annum) (Khasra No. 01), Village - Faraswaha, Tehsil - Ajaygarh, Dist. Panna (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

29. Case No. - 7971/2020 Shri Rasmeet Singh Malhotra S/o Shri Ajeet Singh Malhotra, Near Alka Talkies, Nehru Ward, Pipariya, Dist. Hoshangabad, MP - 461775 Prior Environment Clearance for Sand Quarry in an area of 8.0 ha. (40000 cum per annum) (Khasra No. 02), Village - Majhgay, Tehsil - Ajaygarh, Dist. Panna (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

30. Case No. - 7972/2020 Shri Rasmeet Singh Malhotra S/o Shri Ajeet Singh Malhotra, Near Alka Talkies, Nehru Ward, Pipariya, Dist. Hoshangabad, MP - 461775 Prior Environment Clearance for Sand Quarry in an area of 7.50 ha. (80000 cum per annum) (Khasra No. 01), Village - Sunhara, Tehsil - Ajaygarh, Dist. Panna (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 38 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021 31. Case No. - 7973/2020 Shri Rasmeet Singh Malhotra S/o Shri Ajeet Singh Malhotra,

Near Alka Talkies, Nehru Ward, Pipariya, Dist. Hoshangabad, MP - 461775 Prior Environment Clearance for Sand Quarry in an area of 5.10 ha. (26000 cum per annum) (Khasra No. 24), Village - Gudha, Tehsil - Pawai, Dist. Panna (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

32. Case No. - 7974/2020 M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Taldarwaza, Dist. Tikamgarh, MP Prior Environment Clearance for Sand Quarry in an area of 10.0 ha. (80000 cum per annum) (Khasra No. 472/2), Village - Baarbandh-4, Tehsil - Gaurihar, Dist. Chhatarpur (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

33. Case No. - 7975/2020 M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Taldarwaza, Dist. Tikamgarh, MP Prior Environment Clearance for Sand Quarry in an area of 12.0 ha. (50000 cum per annum) (Khasra No. 472/2), Village - Baarbandh-2, Tehsil - Gaurihar, Dist. Chhatarpur (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

34. Case No. - 7976/2020 M/s Anandeshwar Agro Foods Pvt. Ltd, Shri Ravindra Singh Bundela, Taldarwaza, Dist. Tikamgarh, MP Prior Environment Clearance for Sand Quarry in an area of 10.0 ha. (80000 cum per annum) (Khasra No. 2531/13), Village - Goyra, Tehsil - Gaurihar, Dist. Chhatarpur (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

35. Case No. - 8029/2020 M/s R.K.Contractors and Engineers Pvt. Ltd, Shri Rajendra Kumar Gupta, B-72, Shahpura, Dist. Bhopal, MP Prior Environment Clearance for Sand Quarry in an area of 7.6520 ha. (15000 cum per annum) (Khasra No. 132/1, 133), Village - Gangatkhedi, Tehsil - Maheshwar, Dist. Khargone, (MP)

This case was discussed in 471st SEAC meeting dated 05.01.2021, ToR recommended by SEAC is hereby approved.

36. Case No. - 7708/2020 M/s. Citadel ISWM Project Singrauli Pvt. Ltd, 113, Diamond Trade Centre, 3-4, Diamond Colony, New Palasia, Dist. Indore, MP – 452001 Prior Environment Clearance for Integrated Solid Waste Management (ISWM) Project for processing of 188 TPD Integrated Solid Waste Comprises of Composing Plant and Secure Land Filling facility (area 26 Acre) at Khasra no. 1159, 1163, & 755 Village - Ganiyari and Bharkur, Tehsil & Dist. Singrauli (MP)

This case was discussed in 472nd SEAC meeting dated 06.01.2021, ToR recommended by SEAC is hereby approved.

37. Case No. - 8014/2020 M/s Badi Stonex, Partner, Shri Manish Kumar Mangal S/o Shri Jagdish Prasad Mangal, R/o, Chirpura Road, Biloua, DIst. Gwalior, MP Prior Environment Clearance for Stone Quarry in an area of 1.10 ha. (26460 cum per annum) (Khasra No. 3894), Village - Biloua, Tehsil - Dabra, Dist. Gwalior, (MP)

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 39 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

This case was discussed in 472nd SEAC meeting dated 06.01.2021, ToR recommended by SEAC is hereby approved.

38. Case No. - 8013/2020 M/s Maha Laxmi Stone Crusher, Partner, Smt. Indra Shrivastava, R/o, 5, Vidhya Vihar Colony, R.K.Puri, Thatipur, DIst. Gwalior, MP Prior Environment Clearance for Stone Quarry in an area of 4.0 ha. (2,00,000 cum per annum) (Khasra No. 80/3), Village - Pachara (Badouni Khurd), Tehsil - Datia, Dist. Datia, (MP)

This case was discussed in 472nd SEAC meeting dated 06.01.2021, ToR recommended by SEAC is hereby approved.

39. Case No. - 8032/2020 Smt. Shashi Pandey W/o Shri Anjani Kumar Pandey, Village - Manegaon, Tehsil & DIst. Jabalpur, MP – 482005 Prior Environment Clearance for Stone & Murrum Quarry in an area of 3.98 ha. (Stone - 41591 cum per annum, Murrum - 1313 cum per annum) (Khasra No. 17, 24, 27 (Part)), Village - Manegaon, Tehsil - Jabalpur, Dist. Jabalpur, (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

40. Case No. - 7956/2020 M/s Satguru Cements Private Limited, 601/1, Airen Heights, Scheme No. 54, PU - 3, Oppo. C - 21 Mall, AB Road, Indore Prior Environment Clearance for Limestone Deposit in an area of 14.424 ha. (50988 tonne per annum) (Khasra No. 41/1, 42, 55, 56, 56/1, 56/2, 58/2, 83, 84, 86, 86/2, 87, 88, 108, 106, 107), Village - Khedi Balwari, Tehsil - Gandhwani, Dist. Dhar (MP) .

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

41. Case No. - 8006/2020 M/s Satguru Cements Private Limited, 601/1, Airen Heights, Scheme No. 54, PU - 3, Oppo. C - 21 Mall, AB Road, Indore, MP Prior Environment Clearance for Limestone Deposit in an area of 4.877 ha. (15728 tonne per annum) (Khasra No. 184, 193, 183), Village - Ghursal, Tehsil - Gandhwani, Dist. Dhar (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

42. Case No. - 8007/2020 M/s Satguru Cements Private Limited, 601/1, Airen Heights, Scheme No. 54, PU - 3, Oppo. C - 21 Mall, AB Road, Indore, MP Prior Environment Clearance for Limestone Deposit in an area of 95.0 ha. (336912 tonne per annum) (Khasra No. 126, 127, 128, 129, 130/1, 130/2, 130/4, 130/5, 130/6, 130/7, 130/8, 131, 132/1, 132/2, 132/4/1, 132/4/2, 133, 134, 135, 136, 137, 138, 139, 140/1/1/A, 140/1/2/B, 1140/1/3/A, 140/1/4, 140/2, 141, 142/1), Village - Bekliya, Tehsil - Gandhwani, Dist. Dhar

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

43. Case No. - 8025/2020 M/s MOIL Limited, Shri Kishore Chandraker, Senior DGM, MOIL Bhavan, 1A, Katol Road, Dist. Nagpur, Mah. – 440013 Prior Environment Clearance for Expansion of Manganere Ore Mine in an area of 69.581 ha. (10,000 to 1,20,000 Tonne per annum) Khasra No. Lugma : 61, 58/1, 58/2, 58/3, 60/1, 60/2, 60,3, 62/02, 62/9, 56/1, 56/2, P.O.5, P.O.64, 65/1 to 65/6, 66P.O., 68, 49/1 to 49/8

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 40 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

P.O.57, 42/1, 42/2, 67/1 to 67/6, 43/1 to 43/4, 45/1 P.O.45/2, P.P.46, 92/1, 92/2, 93, 94, 95, P.O.98/1 to 98/9 Ukwa : P.O.5, 6/2, 7, 9, 10, 12 Tehsil - Paraswada, Dist. Balaghat, (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

44. Case No. - 7995/2020 M/s Banafar Granite Industries, Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur, MP – 471510 Prior Environment Clearance for Stone Quarry in an area of 3.688 ha. (130758 cum per annum) (Khasra No. 1680, 1683/1, 1700, 1682, 1701, 1684/2), Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

45. Case No. - 7996/2020 M/s Banafar Granite Industries, Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur, MP - 471510 Prior Environment Clearance for Stone Quarry in an area of 2.439 ha. (20037 cum per annum) (Khasra No. 1347/2/1, 1357/1, 1345, 1349/1), Village - Prakash Bamhori, Tehsil - Gaurihar, Dist. Chhatarpur (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

46. Case No. - 7964/2020 Shri Ashok Singh Yadav, 108, Bankers Colony, Thatipur, Dist. Gwalior Prior Environment Clearance for Stone Quarry in an area of 4.0 ha. (150000 cum per annum) (Khasra No. 56/2, New - 132, 133), Village - Rafadpur, Tehsil - Dabra, Dist. Gwalior (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

47. Case No. - 8031/2020 M/s Kamtanath Minerals, Partner, Ms. Shivani Bhardwaj, R/o, 366, Jiwaji Nagar, Thatipur, Dist. Gwalior, MP - 474005 Prior Environment Clearance for Granite Quarry in an area of 6.90 ha. (1500 cum per annum) (Khasra No. 37/1/Min-1), Village - Bedaura Jungle, Tehsil - Lidhora, Dist. Tikamgarh, (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

48. Case No. - 8021/2020 M/s R.J.Traders, Prop. Shri Nabi Baksh, S/o SHri Raheem Baksh, R/o, Naya Bazar No. 02, Dist. Damoh, MP Prior Environment Clearance for Granite Quarry in an area of 6.50 ha. (2400 cum per annum) (Khasra No. 36), Village - Jamuniya, Tehsil - Shahgarh, Dist. Sagar, (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

49. Case No. - 7997/2020 Shri Sudhir Kumar Jain S/o Shri Sunder Lal Jain, Opp. Nagar Nigam, Dist. Katni, MP - 483501 Prior Environment Clearance for Dolomite Quarry in an area of 8.681 ha. (37584 cum per annum) (Khasra No. 128, 129, 130, 138, 139, 140, 141, 142P, 143, 144, 145), Village - Malhan, Tehsil - Badwara, Dist. Katni (MP).

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 41 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

50. Case No. - 8022/2020 Smt. Seema Chaurasia W/o Shri Arvind Chaurasia, R/o, Near Punjab National Bank, Jawahar Road, Dist. Chhatarpur, MP Prior Environment Clearance for Metal Stone Quarry in an area of 3.430 ha. (250374 cum per annum) (Khasra No. 333), Village - Gourari, Tehsil - Maharajpur, Dist. Chhatarpur, (MP)

This case was discussed in 473rd SEAC meeting dated 07.01.2021, ToR recommended by SEAC is hereby approved.

51. Case No. - 8044/2020 Shri Ujjawal Chouhan, R/o Santoshi Mata Ward, Pandhurna, Dist. Chhindwara, MP Prior Environment Clearance for Sand Quarry in an area of 20.0 ha. (196500 cum per annum) (Khasra No. 1/1), Village - Surjana, Tehsil - Handia, Dist. Harda, (MP).

This case was discussed in 474th SEAC meeting dated 08.01.2021, ToR recommended by SEAC is hereby approved.

52. Case No. - 8045/2020 Shri Ujjawal Chouhan, R/o Santoshi Mata Ward, Pandhurna, Dist. Chhindwara, MP Prior Environment Clearance for Sand Quarry in an area of 7.810 ha. (58860 cum per annum) (Khasra No. 62), Village - Chhindgaon, Tehsil - Timarni, Dist. Harda, (MP)

This case was discussed in 474th SEAC meeting dated 08.01.2021, ToR recommended by SEAC is hereby approved.

53. Case No. - 8046/2020 Shri Ujjawal Chouhan, R/o Santoshi Mata Ward, Pandhurna, Dist. Chhindwara, MP Prior Environment Clearance for Sand Quarry in an area of 13.0 ha. (141500 cum per annum) (Khasra No. 1), Village - Khedineema-A, Tehsil - Handia, Dist. Harda, (MP)

This case was discussed in 474th SEAC meeting dated 08.01.2021, ToR recommended by SEAC is hereby approved.

54. Case No. - 8052/2020 Shri Ujjawal Chouhan, R/o Santoshi Mata Ward, Pandhurna, Dist. Chhindwara, MP Prior Environment Clearance for Sand Quarry in an area of 13.0 ha. (150900 cum per annum) (Khasra No. 1), Village - Khedineema-B, Tehsil - Handia, Dist. Harda, (MP)

This case was discussed in 474th SEAC meeting dated 08.01.2021, ToR recommended by SEAC is hereby approved.

55. Case No. - 7683/2020 M/s Ajay Granite, Partner, Shri Dinesh Singh, Pura Jyoraha, Tehsil - Luvkuchnagar, Dist. Chhatarpur Prior Environment Clearance for Granite Quarry in an area of 1.40 ha. (50000 cum per annum) (Khasra No. 1391 (P)), Village - Didwara, Tehsil - Luvkuchnagar, Dist. Chhatarpur, (MP)

This case was discussed in 474th SEAC meeting dated 08.01.2021, ToR recommended by SEAC is hereby approved.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 42 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021 56. Case No. - 7335/2020 Prior Environment Clearance for Expansion of Stone Quarry in

an area of 3.30 ha. (68800 to 150000 cum per annum) (Khasra No. 2276) at Village- Prakash Bamhauri, Tehsil- Gaurihar, District- Chhatarpur (MP).by M/s Jay Ambey Mines, Village - Prakash Bamhauri, Tehsil - Gaurihar, Dist. Chhatarpur, MP – 471516..

The case was discussed in 643rd SEIAA meeting dtd 06.10.2020 and it has been recorded that ...........

"The case was discussed in 449th Meeting dated 24/07/2020. Qry. letter issued vide letter No. 400 dated 7/08/2020.and it was recorded that………………

PP’s reply not received till date and it appears that PP is not interested to continue with the project. Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has submitted required documents vide L.no. nil dated nil. received in SEIAA Office 22.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for appraisal. Copy to PP and all concerned

57. Case No. - 7487/2020 M/s Shreeji Infrastructure India Pvt. Ltd, Shri Pranav Pratap Singh, 1180, University Road, Pachpedi, South Civil Lines, Dist. Jabalpur, MP – 482001 Prior Environment Clearance for Stone Quarry in an area of 3.250 ha. (107692 cum per annum) (Khasra No. 307/3/KA), Village - Lilauri, Tehsil - Raghurajnagar, Dist. Satna (MP)..

The case was discussed in 643rd SEIAA meeting dtd 06.10.2020 and it has been recorded that ...........

" The case was discussed in 449th Meeting dated 24/07/2020. Qry. letter issued vide letter No. 400 dated 7/08/2020.and it was recorded that………………

PP’s reply not received till date and it appears that PP is not interested to continue with the project. Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has submitted required documents vide L.no. nil dated 20.01.2021 received in SEIAA Office 20.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for appraisal. Copy to PP and all concerned.

58. Case No. - 7506/2020 M/s Siddhi Vinayak Stone Crusher, Shri Vijay Kuderiya, Partner, Ward No. 19, Basari Darbaza, Near Kamla Nehru, Dist. Chhatarpur, MP - 471001 Prior Environment Clearance for Stone Quarry in an area of 2.8440 ha. (150000 cum per annum) (Khasra No. 2149, 2150, 2224), Village - Kanti, Tehsil - Chhatarpur, Dist. Chhatarpur (MP)

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 43 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

The case was discussed in 643rd SEIAA meeting dtd 06.10.2020 and it has been recorded that ...........

" The case was discussed in 463 Meeting dated 01/10/2020 .and it was recorded that………………

The case was scheduled again for presentation in 463rd SEAC meeting dated 01/10/20 but neither the Project Proponent (PP) nor his representative remains absent. PP was also absent in the 456th meeting dated 17/09/2020. It appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please..

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has submitted required documents vide L.no. nil dated 11.01.2021 received in SEIAA Office 12.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for appraisal. Copy to PP and all concerned.

59. Case No. - 7733/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP – 464385 Prior Environment Clearance for Sand Quarry in an area of 0.330 ha. (1,648 cum per annum) (Khasra No. 30), Village - Barla, Tehsil - Raisen, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 464th SEAC dated 3/10/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

60. Case No. - 7729/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP - 464385 Prior Environment Clearance for Sand Quarry in an area of 5.00 ha. (5,000 cum per annum) (Khasra No. 73), Village - Muwar, Tehsil - Baraily, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 44 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

This case was recommended in 462nd SEAC dated 30/9/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

61. Case No. - 7730/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP - 464385 Prior Environment Clearance for Sand Quarry in an area of 4.00 ha. (25,000 cum per annum) (Khasra No. 551), Village - Motlasir, Tehsil - Baraily, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 462nd SEAC dated 30/9/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

62. Case No. - 7732/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP – 464385 Prior Environment Clearance for Sand Quarry in an area of 2.00 ha. (1,000 cum per annum) (Khasra No. 104), Village - Bhouti-1 Ghat, Tehsil - Badi, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 464th SEAC dated 3/10/2020 it was recorded that..........

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 45 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

63. Case No. - 7734/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP – 464385 Prior Environment Clearance for Sand Quarry in an area of 5.00 ha. (10,000 cum per annum) (Khasra No. 385), Village - Sultanganj, Tehsil - Udaipura, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 464th SEAC dated 3/10/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

64. Case No. - 7736/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP - 464385 Prior Environment Clearance for Sand Quarry in an area of 0.40 ha. (2,000 cum per annum) (Khasra No. 123), Village - Tijalpur, Tehsil - Raisen, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 464th SEAC dated 3/10/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 46 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

65. Case No. - 7772/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP - 46438 Prior Environment Clearance for Sand Quarry in an area of 3.50 ha. (1,000 cum per annum) (Khasra No. 229), Village - Mohadkalan, Tehsil - Udaipura, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 462nd SEAC dated 30/9/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

66. Case No. - 7731/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP – 464385 Prior Environment Clearance for Sand Quarry in an area of 0.770 ha. (3,849 cum per annum) (Khasra No. 72), Village - Berkhedi Ghat, Tehsil - Raisen, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 464th SEAC dated 3/10/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 47 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

67. Case No. - 7771/2020: Shri Rajendra Raghuwanshi, D-4, Phase-2, Shri Ram Colony, Hoshangabad Road, Dist. Bhopal, MP - 464385 Prior Environment Clearance for Sand Quarry in an area of 0.710 ha. (1,000 cum per annum) (Khasra No. 245), Village - Nayakheda-2, Tehsil - Udaipura, Dist. Raisen, (MP).

The case was discussed in 643rd SEIAA meeting dtd.6.10.2020 and it was recorded that…………….

This case was recommended in 464th SEAC dated 3/10/2020 it was recorded that..........

PP”s reply not received till date and it appears that PP is not interested to continue with the project.

Since the tenure of SEAC will be over on 09 October, 2020 and all such cases which are pending at SEAC will become category-I cases in the absence of SEAC. Thus case file is being sent to SEIAA for onward necessary action please.

As per above observation of SEAC, it has been decided to delist above cases mentioned in S. No. 81 to 132 on the condition that if PP intends to present the case in SEIAA, it will then be relisted for appraisal. Copy to PP and all concerned.

PP has requested vide L.No. Nil dated 22.1.2021 (with a copy of order dated 12.10.20 of the Hon’ble Supreme Court of India) received in SEIAA office on 23.01.2021 to relist the case as PP is now ready to present their case in SEAC. Considering the request of PP, it was decided to relist the case and send the technical file to SEAC for examination and obtaining legal opinion of Advocate General, Govt. of MP. Copy to PP and all concerned.

68. Case No. - 6097/2019 Prior Environment Clearance for Stone Quarry in an area of 5.0 ha. (299965 cum per annum) (Khasra No. 38), Village - Ghosipur, Tehsil - Gaurihar, Dist. Chhatarpur (MP) by M/s Denine Granites, Village - Ghosipur, Tehsil - Gaurihar, Dist. Chhatarpur, MP – 471516.

This case was relisted in 646th SEAC Meeting dated 17.12.20 and PP was called for clarification but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting.

69. Case No. - 6697/2019 Prior Environment Clearance for Limestone Mine (Opencast Fully Mechanized Method) in an area of 13.150 ha. for production capacity of 1,90,165 TPA at khasra no. 362, 366, 404, 410/1, 416, 417, 421 at Village - Rodada, Tehsil - Gandhwani, Dist. Dhar (MP) by M/s Satguru Cements Private Limited, 601/1, Airen Heights, Scheme No. 54, PU - 3, Oppo. C - 21 Mall, AB Road, Indore

(Tanvi Sundriyal) Member Secretary

(R.K. Sharma) Member

(Rakesh K. Shrivastava) Chairman

655th SEIAA Meeting dtd.29.01.2021 Page 48 of 48

Minutes of the 655th Meeting of SEIAA dated 29.01.2021

In the minutes of 644th SEIAA Meeting dtd 27.10.2020 it is recorded viz Prior Environment Clearance for Limestone Mine (Opencast Fully Mechanized Method) in an area of 13.150 ha. for production capacity of 1,90,165 TPA at khasra no. 326, 366, 404, 410/1, 416, 417, 421 at Village - Rodada, Tehsil - Gandhwani, Dist. Dhar (MP) by M/s Satguru Cements Private Limited, 601/1, Airen Heights, Scheme No. 54, PU - 3, Oppo. C - 21 Mall, AB Road, Indore in place of khasra no. 326 now be read as “khasra no. 362 (As per SEAC recommendation, MRD Order dtd. 27.12.2016)”.

In view of above, the corrigendum is issued to read khasra no. 362 in place of khasra no. 326 for further proceeding and necessary action. Copy to PP and all concerned.

Meeting ended with a vote of thanks to the Chair.