INSERVICE INSPECTION AND TESTING
PROGRAM PLAN
FIRST TEN-YEAR INSPECTION INTERVAL
DIABLO CANYON POWER PLANT
UNIT 2
USNRC DOCKET NO. 50-323
ISI Prepared by:
IST Prepared by:
Reviewed by:
Approved by:
E. HILL ISI Specialist
J. A S 'wr Prod. Eng~''neerPri ry "Systems
K. FRANK Supervrsor of ISI NDE
PSRC DATE: December 6, 1984
Approved: 07 WR. C. THORNBERRY DCPP Pla Manager
CONTROLLED COPY NO.
Distribution: This program plan is distributed by theDocument Control,Group. The Program Planshould be readily available for use byindividuals having responsibi1ity forscheduling and condu'ct of examina'Clans.,tests and audits. It is submitted''o theAuthorized Inspection Agency, Sta'8e ofCalifornia Division of Industrial 'Safety andthe United States Nuclear RegulatoryCommission. All copies are kept current -byissuance of periodic changes which "aresubject to regulatory review.
8503i80330 850222PDR ADOCK 05000323Q PDR
HEBULNORY DOCKB Fg,E t,gPy
NUCLEAR PLANT OPERATIONSDiablo Canyon Power PlantISI/NDE Department420.9
Program Plan Change No 0
Date Oct. 15, 1984
Change to Diablo Canyon Unit 2Inservice Inspection And TrainingProgram Plan
TO: Holders of Diablo Canyon Unit 2 Inservice Inspection And TestingProgram Plan.
The following changes have been made to the Diablo Canyon Unit 2Inservice Inspection and Testing Program Plan:
CHANGES CHANGE INSTRUCTIONS
Original Issue
After revising your copy of the Program Plan in accordance with theseinstructions, place this sheet in the front of the manual behind thecontrolled copy numbered title page. Please sign and date the receiptletter and return to DCPP Document Control. For questions orassistance please phone the Document Control office, PGandE extension69-3500, Pacific Bell phone (805) 541-7500.
DIABLO CANYON POWER PLANTUNIT 2
INSERVICE INSPECTION AND TESTING PROGRAM PLAN(FIRST 10-YEAR INTERVAL)
TABLE OF CONTENTS
SECTION TITLE
1.0
2.0
INTRODUCTION AND GENERAL DESCRIPTION
ASME SECTION XI CODE BOUNDARY DRAWINGS
3.0
3.1
INSERVICE INSPECTION (IS I ) PROGRAM
Nondestr uctive Examination of Components
CLASS 1
Reactor Vessel................P ressurszer...................Steam Generators.....(PrimaryPiping........................P umps t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Valves........................CLASS 2
Pressure Vessels..............P'p1ng0 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
P Umps ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Valves........................CLASS 3
~ ~ ~ ~ ~ \ ~ ~
Side)...
.Table 3.1.1
. Table 3.1.2
. Table 3.1.3
. Table 3.1.4
. Table 3.1.5
. Table 3.1.6
. Table 3.1.7
.Table 3.1.8
.Table 3.1.9
. Table 3.1.10
Component Supports............Piping Supports...............
.Tab. 3.1.11
. Tab. 3.1.12
Re vest for Relief (NDE 5 Maintenance).Tab. 3.1. 13
3.2
List of NDE Calibration Standards
System Pressure Tests
Code Class 1 SystemsCode Class 2 SystemsCode Class 3 SystemsRequest for Relief
Appendix A
4.0
4.1
4.2
INSERVICE TESTING (IST PROGRAM
Inservice Testing Of Pumps
Request For Relief (Pumps IST)
Inservice Testing Of Valves
Request For Relief (Valves IST)
INSERVICE INSPECTION AND TESTING PROGRAM PLANFIRST TEN-YEAR INTERVAL
INTRODUCTION
This volume describes the Inservice Inspection and Testing Program Plan for the
Diablo Canyon Power Plant Unit 2 pressure retaining components (includingsupports) which are classified ASME Code Class 1, Class 2 and Class 3.
This ISI Program Plan complies with the requirements of 10CFR Part 50.55a(b) (2)and Part 50.55a(g), effective November 1, 1980 and utilizes the ASME Boiler and
Pressure Vessel Code Section XI, 1977 Edition through and including the Summer
1978 Addenda as the basis for the inservice examinations and tests to be
conducted during the initial 120-month inspection interval. The initialinspection interval will be scheduled to begin when the Unit is placed incommercial operation.
Where conformance with certain code requirements is impractical, requests forrelief are included in each section with supporting information and proposed
alternatives.
For Code Class 1 pipe welds only, the extent and frequency of examination hasbeen determined by Tables IWB-2500 and IWB-2600, Category B-J, of the 1974Edition through Summer 1975 Addenda of Section XI(10CFR50.55a(b)(2)(ii)). ForCode Class 2 pipe welds only, the extent and frequency of examination has beendetermined by Paragraph IWC-2411 and Table IWC-2520, Category C-F and C-G ofthe 1974 Edition through Surfer 1975 Addenda of Section XI(10CFR50.55a(b)(2)(iv)(B)). The distribution among multiple streams inParagraph IWC-2411 (S'75) has not been used, rather the 'single
stream'hilosophyof the summer 1978 Addenda is followed throughout. In all cases thelowest numbered line is used as representative for the multiple streams. Theseexceptions to the use of the 1977 Edition through Summer 1978 Addenda onlyaffect the Code Class 1 and Class 2 piping system welds extent and frequency ofexamination. Examination techniques for the pipe welds and all othercomponents requirements conform to the 1977 Edition through Summer 1978 Addendaof Section XI.
Reference 10CFR50.55a(g)(5)(iii)
Preservice examinations, where required, have been completed and are summarized
under separate cover. All preservice examination data will be available forreview at the plant site.
Should the examinations described in this volume reveal flaw conditions which
require repair by welding, a repair program shall be developed as appropriate inaccordance with the requirements of Article IWA-4000 of Section XI.
ASME SECTION XI CODE BOUNDARY DRAWINGS
This section contains the ASME Code Classification Boundary Drawings, PGandE
Number 104628. Regulatory Guide 1.26 was used as the governing document insetting up the ISI boundary. The drawings show +he Code Class 1,2 and 3 systems
and components subject to inservice inspection and testing requirements.
Systems and components are identified by Code Class and are color coded as
applicable to indicate exemptions from various code requirements . These
drawings are extracted from the piping schematics (PAID's) for the Plant thatare contained in- Volume V of the FSAR (Section 3.2). All ASME Code Class 1,2and 3 lines are shown. To emphasize the Section XI Code Boundaries, pages
containing lines other than ASME Code Piping have been omitted and non-ASME
lines have been ghosted on the pages included. An explanation of the colorcoding system will be found at the end of the drawings.
Revisions to these drawings may occur from time to time but will not be
distributed to this Program Plan as they are issued. Current drawings aremaintained by the Plant Document Control Department and may be incorpora+ed tothis Program Plan with other changes as necessary. In all cases, the latestapproved drawing shall apply.
Regulatory Guide 1.26, "guality Classifications and Standards forWater-Steam-,and Radioactive-Waste-Containing Components of Nuclear PowerPlants.
As allowed by Paragraphs IWB-1220, IWC-1220, IWC-1230 and Table IWD-2500-1of Section'I.
INSERVICE INSPECTION (ISI)PROGRAM'ondestructive
Examination of Com onents
This section sets <orth the Nondestructive Examination Program Plan for Diablo
Canyon Unit 2. It describes the ASME Code Class I, 2 and 3 components subjectto surface, volumetric and visual (VT-I, VT-3, VT-4) examination as required by
Section XI during the first ten-year inspection interval.
Construction permits for Diablo Canyon were issued prior to development of ASNE
Code requirements for piping systems . The piping was designed and built to therequirements of ASA B31. 1, USAS B31. 1.0 and USAS B31.7 which did not requirestress analysis calculations. In 1972, the ASME Code incorporated pipingrequirements which included stress analysis calculations. Plants designed orbuilt before the new rules became effective were exempted from the requirements.The Summer 1978 Addenda to Section XI, on which this ISI Program Plan is based,
requires Class I and Class 2 pipe welds to be selected for examination based on
the stress anal vsis data. In recognition of the fact that no stress analysisdata was computed for older plants, 10CFR50.55a allows use of the Summer 1975
6
Addenda for pipe weld scheduling. The Summer 1975 Addenda does not requirestress analysis calculations, but instead requires welds to be chosen atstructural discontinuities (these are presumed to be the highest stress areas).The extent and frequency of examination for pipe welds in this ISI Program Plan
therefore conforms to the Summer 1975 Addenda.
The NDE section is divided in five parts. The first three cover ASME Code Class
1, 2 and 3 components, the fourth covers requests for relief for all Code
Classes where it has been determined that a Code requirement is impractical and
the fifth covers the listing of NDE calibration standards. In each of the firsttwo parts, the tables identify the Code Class, Code Category, Code Item Number',
name of the component or system, general identification and total number ofitems in the svstem.
April 23, 1968 for Unit 1 (CPPR-39); December 9, 1970 (CPPR-69) for Unit 2
10CFR50.55a(b)(2)(ii) and lOCFR50.55a(b)(2)(iv)(B)
The general identification includes as applicable the serial number, the
reference drawing number or ISI drawing (isometric) bv page number, component
number and line number. Also given are the required NDE methods, the amount ofitems to be examined and extent of examination, the examination period in which
the examination will be conducted , percent to date (which accumulates the
percentage of total number of code-required items through the given time
period ), and applicable remarks or references to requests for relief thatappear. in Part 4 of this section.
In the third part, each Class 3 system and component is identified, along withits location on drawing 104628 and the reference drawings or seismic drawing
number. The examination methods and total number of supports for each component
or system is then given.
In the fourth part, requests for relief are presented. The tables identify the
component or item, Code Class, program table (reference Parts I, 2, and 3 ofthis section), Code Category and Code Item Number. The code requirement that isdeemed impractical is then stated and the basis for the request for relief,alternate examination proposal and schedule for implementation of the alternateexamination are given.
7Each 3 I/3 year examination period will be further subdivided by refuelingoutage. Actual items scheduled for each outage will be listed on the ISIExamination Schedule which will be issued prior to the outage.
The sum of "percent to date" will always equal or exceed the percentage oftotal items required to be examined by the Code.
Augmented examinations, if required by HRC, are normally included as provisions
in the plant Technical Specifications. Examples include examinations required
for the reactor coolant pump flvwheels, steam generator tubes and the mechanical
and hydraulic snubbers. Each reactor coolant pump flywheel will be inspected in
accordance with Regulatory Position C.4.b of Regulatory Guide 1.14, Revision I,August 1975. In addition to the requirements of Section XI, eddy current
testing of the steam generators tubes and the visual inspection and functional
test o< the snubbers will be conducted to meet the requirements of the plantTechnical Specifications. These examinations, however, are not included in thisISI Program Plan. They will be conducted in accordance with plans and
procedures which meet the requirements of the Technical Specifications.
Pursuant to 10CFR 50.55 a (g)(6)(ii)
INSERVICE INSPECTION PRO(iRAM
S stem Pressure Tests
This section sets forth the System Pressure Test Program Plan for Diablo Canyon
Unit 2. Pressure retaining components within each system boundary are subjected
to appropriate system pressure tests to verify their structural integrity and to
assure they remain leak tight for continued and safe operation. During allpressure tests, visual examination (VT-2 per IWA-2212 and IWA-5240 of Section
XI) will be conducted on the pressure retaining boundary of all applicable
components and systems.
This section consists of four parts -—pressure tests for Code Class I, 2 and 3
systems and the request for relief where pressure test is impractical. It is
presented in tabular format. It shows the component or piping system
description, the drawing sheet number of the Code classification drawing (Dwg.
104628), identifies the applicable Section XI pressure test requirement, the
required test pressure, test frequency and any amplifying remarks for the
pressure test. Each system code class has its own tab.
INSERVICE TESTING OF PUMPS AND VALVES
The pump and valve program demonstrates the operational readiness of Code Class
I, 2 and 3 pumps and valves which are required to perform a specific function in
shutting down the reactor or in mitigating the consequences of an accident.This program is presented in a table format with line entries for each pump orvalve.
The tabular format for the pump IST program includes the pump name and number,
the Code class, applicable surveillance test procedure and the test parameters,
i.e., pump speed, pump inlet pressure, pump differential pressure, flow rate,pump vibration, pump lubrication (observe level or pressure), and pump
lubrication temperature. Request for relief from Code requirements is alsopresented in table format with its own tab.
The tabular format for the valve IST program includes the valve number, valvedescription, Code class," IWV-2200 valve categorv, valve size, type (ball,butterfly, check, diaphragm, gate, globe, plug or relief valve), actuator type(air operated, electric motor, electrohydraulic, manual or solenoid-operated),valve position, test requirement, applicable stroke time and the test frequency.Request for relief from Code requirement is also presented in table formathaving its own tab.
The pump and valve IST program becomes effective with the issuance of theoperating license for the Unit.
II'Itr
c
t w etweIe~«
~ e aI et tI~ ew etv tw«IteII ~
«T
II
r-.@e ~
~ ~tttNIIB~~ III
~41K.II« -'I 4'~++
1III
IS ~e
f~rtvtvrr)SY w )I 4 we I
I . I«wv Iv tl,
( IT" QeW eet w» I««tee«QI
~I I
LI—
I ~'S~t e ~
W«t I
~w ee ~ te
I~ e e ~
~ ~ W~ ee
e ww ~
~ ~ t
QP«
~ PwtI«wee
If«I~ ~
) ~
I
ww «weI
' «I 'e~
~e\«w«
«IW
stet ~v~ I *,
~*
fi
~I
~I~ ~
~ I
f':I ~
I
)at'
IIrf e ~
.I'):)
)VY
~'— t9
gI-;.~i=tgtl~lve.,l.)v-' I I Ilvie =„g tl IPYI
IDE
ZIII
zZO
N
e- weweQ.I« ~~~e
tte
~ IWI
vwe
«IW«W
~ ~
of'
i OS
~ ~ wweI« V I«et w 1 «v
Q Iye
~ )S
UNIT 2
C
TCSIISDSK„
p C
COAST VAIILTSDIYNOII A COf
OII)
O ZW
)4
C )4
IZ
IS DZCI
4.Z
-2N3./5-8
TA/3/P CÃ'/44'IERIS'//EE7 89TBLEO mAN S
5-t2 8f SEE ABLE CHANG 5 SH9-ID& A'PPROVED POR CONSTRUCTION
OAYC 0 CSKINfr)OHTABLE OF CHANGES
IZW I5)KE 7A8CE OF C// ES S//PET 39
699
OH
LM CLIe vOIL fSD
I 69972DKIKV. 4,4 4 ~ 4444OSOIL ~, ~ 44 IS lSOIIRV /5 ~
O*VK Q Q T
IIO HE
ASME CODE BOUNDARIES FORINSERVICE INSPECTION AND
TESTING PROGRAM
DIABLO CANYONDEPARTMENT OF ENGINEERING
PACIFIC GAS AND ELECTRIC COMPANYSAN FRANCISCO, CALIFORNIA
VM r)4rrr4 llv.
DRAWING USY
SUSCKSKDCS
SILLOf HATCKIAL
1.04628 c
b '- L
SUfCIIStDCD SY
SHKCYNO. f I SHCCYS
20 2l 22
LINE DESCRIPTION BOUNDARYSYSTEH
DESCRIPTIONSHEET NO.
(THIS OWG. )PIPING SCHEHATIC„
REFERENCE
IIIIIIIIIIIIII
~raaaGHOSTED
LINES
GHOSTEDLINES
ASHE CLASSIFICATION FOR
INSERVICE INSPECTION AND TESTING
CLASS 1
CLASS 2
CLASS 3
NON.SAFETY RELATED SYSTEHS
INSTRUHENTATION
LINE INTERFACE TO OTHER SHEET (THIS DWG.)SHEET VERTICAL CO-ORDINATE (IN ALPHABET)SHEET HORIZONTAL CO-ORDINATE (IN NUHBER)
GENERAL NOTES
FEEOWATER
TURBINE STEAN
REACTOR. COOLANT
CHEH 8 1/OLQK CONTROL
SAFETY INJECTION
RE6IDUAL HEAT REHOVAL
NUCLEAR. STEAN SUPPLYSAHPLING
CONTAINMENT SPRAY
SPENT FUEL PIT 'COOLI
CQPOHENT. COOL. WTR. ~
HAKE-Q'AT@
3. 4
5. 6. 7
8:,9,10,1112, 13, 14,15. 16
17. 18. 19
20.. 21
22
25, 26, 27,28, 29, 30.31, 32
3.3. 34
, 102003
'02004
102011
102012
102013
102014
1D2016
4; '4A
3, 5, 7
3. 1,4;53, '4. 4B,58, 8
3, 4, 5
3; 4
5,,5A, 6,6A, 7, 8,'9, 10
7, 8
THESE ORAWIN65ARE INTENDEO FOR USE IN IHPLEHENTINGASNE SECTION. XI $ NSERVICE INSPECTION AND TESTINGREQUIRBKNTS ONLY. THEY HAVE NO RELEVANCE TO THEDESIGN AND CONSTRUCTION OF THE COHPDNENTS.
2" SYSTEH,IN GHOSTEO LINE ARE SHOIIN FOR INFORHATIONONLY FOR SPECIFIC DETAILS IN THOSE SYSTEH SEECORRESPONDING REFERENCE SCHEHATIC.ORGY. L SHEET NQ.ON THE RIGHT 'SIDE OF THIS DWG..
NDE EXEHPTION COLOR CODIl& IS AIRED AFTER DRAWINGAPPROVAL. THE LEGEND FOR COLOR COOING ISCONTAINED ON" SHEET ~ ~
SALTWATER (CIRC. WTR,.3
FIRE PROTECTION
DIESEL ENGINE-GEN.
NAKE-UP WATER,
i<>'"
'536
37.
38; 39
102017
102 {ll8
102021
l02QI6 Sh,
55'err-2
PORE OO.~ a ~ 104628RMlNDQEO'BEY 4 '-
'
3IFCV.+lO
'h 4
h KIC'557
I(CV-~
rI.
g m (Iit/y'
f AJ
{Clt/ fL
h
5 f
'IL» C627» -„'g4'.: I ».;4-.»!—
I'I EAR I%7crrIOLIjIFDI:AJx.rr(FA.-I
'(='OHDEHSAITK
5%.TI(.I2.I)„-( ..-
ISrawaGaV l2.3r; ...;I
ag I' 't *vaa. 5 5C-jC lf/
r'I-'. Ls(T> "/ I- I
tI ccFI»T Ep(, I.a/~4/,P p~ (rhlaIQ t!6'L.
I2 i2
'a~g aag'S~DIN»ba'Alva
It.:',flTIIADII45
6'OF4I/II,"I( '!: .
4I2
OV.
I(-5( 7 2
~i-~QTEAI/I6EI»I.g+
I
5I w> ~.wQ' 2I6F4V 45/S KIC:SSyWIV;I
I'45
zOllAM'KIC
57l 35Ke',57t.jg =
.554=.M ID
h I> /h<r I,P ,'6EKZ-Z
I
+el-~II
I
PI
6I
I
" -cr)
11L»WY'4 fa 'Far
1 C 4 I
L(.
I
\I
(i(r57O~5»C
'(. 'KICr51$ .~>E .F iigI3 4~c&,A'<iX y, $
™f'„
IPjP;fih,c aa
, 'ac» I ~g/4/
-4 (.'.«;:4.I(tt475'IIg
61571'D~J!f I6.574 3@I 8TEAIA6ENI2 I
Diif w15('OHTAI~EHT
I~re, c--l
T(P FDA8
O Fi/pit „L'coh III -,~~1 RO
Y9. D Qp.
":;, gf<
li,-. t~rz~ ~
DAD ~Q ~ ~)g. )(/g. „(t'45 15
7~ e+~A<+ ~I44 iS"
47
3D43
CSV~ I
.5n-
LCT IQf64,Klb~
„,'-" k, '.
la 57ryI(Q
iI =g iPC'h t
$ Q
—V-'K.5IL2.6
':D .'~i ~
'g:555=64 ~a:.:..-.. r.'
''T~.O --.,I I YDAI»Oi'(.r'.
rP.toP 4 'r AD~ ~
1
RO,
s. OR*
Ic41
t '" (CVIOC
4'I»7 SIC 549.3 ~ Ih I
.D I I $70')'IBID
I hca I ' I/r ca I
X --:-
LCY Ii16575gl Crau
: K -573=+ rh/ L 44
K-484-6 lI
,K-445h/C~, I
~! I',.«I Q, srS ~-
I
cAAIalPK
YJb~7~/I(IDiAHHO '
5(:V»45IM
RAN WTR.57(5.E5
a/ C»a,
DI~ .'- AUX FEED PUWS
) ~ "b4-7'; -
65'N&:%~~If
Klb~+ D .2J ..'4;I D(I ~4
Ib- 4- »KI6 57f'5'
cal ~IW . Ia»A ot'c»+I»i -I. ISoegT rai OF SECTS
IO~eZO lJ C
* ~c '
e " 4»*+I I~ h Fc/AIc '»».,l,'fQ ]II ca~%4 ta..chl »-2 a»i +'yID»»r etc"7'(IP/ Tc~a'gtr, =P i h+alhlca 4''I T/L(8 5+0
. -.c,
HE7 E Iei(f. E
TTcidffifd5EJ'
IHiFPiHcJ Pti.Uiii8 '
Sn.y'. I4t~SiilciHCi Th'., 522 iNOTE -2
ifiIP ctisTI'1ANFTCi -EPO8-08qE,
TYP OF 7
FETTEROI.F-8IW&
52-4'8
Vi<yz*~f,w I( I ~
C'i'i'TD + 4Ii:O183
O&t 2Pif4TOfi.
R-OI83 i. - ct./Z < Oi83iilP EAST 343c 82 8P.S(~ 'tt// Fv 30~,~
ATM
5. '4 f22 ~ 1
="4I28 ~ ii/2
~2-4125 3/.R -GI83
I VP OF2)
ci Iffoiil/ti47 (, '.,)
R.OiSSYP Fz
52 Iz
(2. MI)(IYQ PUF/IPTTP of 2
6)z'! ~:2 ~ i'(ir> 496, /TE'P Cc4
R GI83 I.S ~t.S R-0>8347 48/ $P- $4
3 zoA vj PO~ 942'it
".52 I4 "ST+ 9'.QIS3
~' i6'D/82-494
Pi47
KI6-+968.P/
co4a ci ~ ~ cc i'TpgLJ
44- 3 ~ '/
<if m&7-2/4VI -4966
PX9c
c-sear»EG w
38%—TYF 8—/4 i st/I'2
T>82 AP+fTTYP 3
PV.'I94;
'C
IC',(lK
FW PIIHP6 Q15CN(THR(l PI5CH LINE, PLAIN)F
PP PP FP~ t i 4/t I I'e i
23 Z-Z 7-I
A 8 &
QOTE5'I.LPI IFIC1 5I,O'LVN ON T".iS OrlBBT
5IIALL &B 'tIOEF(. COPE CI.PiSS '',EXCEP ~ AS tfOTEP.
2. COP. F/AB RICATIOI4 PETAILS SEEIO38fco AIIP f0981&. COOED +2A-B,
82-9 I28-l)7. Po~~:~pl„
. 2-4947-Ily-5
HY~ZIHFO 7II/ Pi/HP5
3/8(TP'of 5I Po
(I I)'4/ 50'I/Z]I gz i]
Pi320
r CO cd
Pi424
5 49 63 - '/2
<t'.5'/i~s-cogw
s.'t'4 '/: ~C.CD/ttS i/2 <&VSTTF OF i5 IAc I/iiSOII
t
,AI/If)O/8 TORY,2 IfiEF: OI83 Pif~F(TTF of 6A'I SVC T)
'PO343 8 3»
82- ci945.l/z. ('g. I)
Pi
s.co5S'/2 ~494 9 '/
34>.3 3~iKI3
52 c949 Ig) s cgctp
Wi,.58I
. I,94
+-496: -'/2 ——.s-49hZ -'/
pi ~ ici 4 74
DC-663057-(S)[a 7 +"I<+ 'AFzf
HI'UX.
FEEDWAQER Ah1hhOhlIA HYDRAZINE INJEI'OH S()CO-=I/ c7eR3
> S75
p,~ gEfEP&tCE. PWb. fEEPWP SP.g~ )Ones Wr.4A REV.9
sHRT % "t'iI p 4 6 7 p 7
50 5S 59
KQCI>2R octswRIml2I
«A«Ska
ara cfear
Iv r ea v a~~vt ~ I> Ir ~ 'J»aa'f.> N
J tall> at. S tr I'da'<aeaWHI
t ~ 4 a>a it»Is> tt Ilrl »Ca.~ r,s e a; I -ef>D.ri Ia et a<„*SSIWIISASA<
I t> vSETADI
2
C.fe
t>f>I-I „..
~ev 4 l Al 'ti r&th'2'
v I'I'4-2TShg
a ~ i>ALLA>tt~ a I ee r'lai
~ r eatlf'I ~
I «es as St«e faId.a e
~ s
at t»ea»atr 4 ~ aaaPga<V
t b SIIPL
\
«
IIIS-222«2ST 7
I,„~ ga« la>V >Ilf ) ta ~a'sile> I ear a r ~ »CIS
I -tva >4 ~ ~ e»aattst)a ~ )4 I i,ts J>tl4DIA <>t', Jail
~ > S ~ tf>J ~ SI »rkI
4 el 4" Sawti» 5 i.I« ~ tD>a rst ~
4 Sr.ttafr>«st fvt veNJ,II II~ Vi:S~I24t
t
522s<fassters
4K'IDEAS'4'JNOtSIII
<- >21~
t >~,» rr >,m t)I
I t,j 7I«>r A>Strep JT» 'rL<
il'L.d)II'fapd<IISSTW
sdf 22. ,. ~ I
>«2A>tF f>OI
I2 IAS
fA 5E~
~ lfi>
h'I
3 " " "~" ~ '.".. v.>DADvvv rf
~R'(FQt '5"E~.=I't l ~
'SJJ~tssssssstTssssssspISI
IEI$ IISSJ>.SST>e«
~ ~~ I'-i<T-> a
passe. ~ r,
'Vv vl
~>a4
4>tP>
f ».S. 24
I
}iIit>t ~'
r ~ fat'w,I'I ~
~ ~ IIa> ~ >tvla~
>
ISvSS Astra»
I-2lSre +rkt<2s-Oat>
« I SIqs»r«
('.sac
~ -"'I't > +tsrSaI~ SISS-5549V .I
-..4AW rat SSI S Q
»H
Iit, ar ~ lvailhr
><44' ~ ~«'r't D<
~ stIa»A d ~ ~'
< TA ~
'a~ rt+ I>~ «tert I
~ ~
cR) p fop.tea<SF I'2 ES
ddv,r g Qr S) I ~'a > rTat ~ ae
ISIA$2 ~ftSh'+589 '2 I hr'tv~mfft~ W'OS r.'>tat
r" IIff-ESPY
IIIw% %~ sfs Isl 00PC s3s
IIII
~ Qy„F22.8$ $
~ aa. t ait. f jg gr F2-ISS ato
ia gN IIIII<SIP%
E>IIN P.;.y
4 ass ae tda8I~% t >«stS~r w&wwwwrrr wria>&~3«fts 2;2 aD
~
wwwwwwww wwwes ww ISsf~s)s
>A» )airs> SAS>>Cd
rttp>r f>fad)
I Sr)A '«2S r>r Ija
g'{(SS
ar I
.Is<.s)4w Q asiq It'+>Jv . >I>4 hs)fae><Q Isfsthsfs ss ww sm cw~ %w sffw~ ++)
J.L. ~La.49 .AII ~ e d IftteQr<t
t4<t>J«'g
ae Q ta)V»S< 2 «rt>ta
~r sr>ah
ef'.%fr MISSI~ rrs Iat
SOFIEII»t tf><M
t«east >T
h~«>fear:std QMwwwww
sft»A ~ Sit>e »AIS>IF> 4
STIR.
W~ dll ~x ~ I
w w e>r «n w w aa ~ Q
a eig : -""~~~~.,
i~<I«SF',
~32.II af
II f',- "Iss.S «hf ' .>tv,rlO ~,4~
Ifsi>fv ges> lalItsfg> Iffa» ~ a g 'Iva ~ III
I'SAR>5,
llWS
frIeds
''gt
~e'TTRJ>L..7
t EM<a
MLI <e II>a tilli',IIIdiCYr
~tfttP, IIJ
~ tat>t»ISI l j
~, IQI
ef',rt'e<S>t
v.-"'t I ~ I Idt
tr »C:r
tt»A>v
I 'er24
~at ~ et> Tr )re
at»Iaaf I<SfS ~~
K~A'0
..,„4„.IR
OO Cfg IM >22etu Q-C ~oF ~ 8an a'I.a'.'-." Ilm 22Wf" IOtOOC an'3 ~'v "P. G h E CO
~wt S w ~! IC4VoZB
5 v ta $CII 55>R l v>R
a ~
5
~ 5 I
}a aaat 5r } I
I
fa
ta a , 15ts . 5
t.t'lt
rtt»$ 15
aj S'
'»la, »=-e-> I ~ a
I «55.*~>IIIAII'5 «I> 4IIS> ~
a >all>. I I'Iar ~ SV tie>a'I%ID
I+,I~ a aa>. ~ I ~
llf$ tt>% 5 1 a
aal S I»a,l
aar II
~ Cr ettK>5 ttV4lf
IRw>5t.j .Itl o. . I,Z'i
fcmI
eg r I
I «p
A A(4.-i~a-!.'"
I
\jj$«TI
~4 Sall>, atltl I~vj}~-I
1 5> 8.SPT«e
ye>«IT>«
&~a~ a
ECF'
')gal Cj > li lee> Ca '. ~a«>$ IfIS »'I' 2$ ~
f'.IIII>ISOCell er
P
'>all>1 I
I a««sl )7 )
wvla>gI~ IS IO>
g oval
hajj ~e'
rif rd 5 tSf .
I I~a'CI>«SXl III>tf>4>j '
>v *,IL r; ~ a
'>
f ~ a»eo
>5
ffdtt 1 ~
r>.
«IIICt v«>$1
III I ~~Rrasg 2!
„"QQI
»
III«a a«a,
ASS j'-Va a>eat+Stew ~Isv «1m
I>T
15~ ~ ~
~ dtt Ilj>T
ct SC>t- I)Ct 50}ed3
(5-5 era }ls.,"-.—.Li>-I
I I T
5
I vQ«
~f
L}O»
I
=S; I~ r ~ lrl}O I>I
I ill>> '5 lfl v ~» li C4
r ae ~ , ~ I « I I'$1~
' v>a»j,»ja>
~ ee
e
vea I ~ a aa «« I~ ap>I«are( 4>e a«C «jill
IC der 5 IP,l, ~ I v ~ a flaw»ra.
J$>IT 2 r
Q
a >Ma
I~»It ~ 14
ttd.tdtf~ ~ I
SNASII
ad "Ojj C>j, jf5' 5'll>el 3
~ ej ~ as a» a«$'O'C> aell
'I» I 1« a>T ~
}eel }}>l ft>jseesa v a>T I~ I Ci ~ >
COCC>a>T $)Hf Sjf-T55STK>5 Stdtt>ttlh.
Ia~»
,lll >tel ~ 5«C>e I IICj'j~ S»'l «lll ~ 1stadtt t a I 'O).»illa I> 5ltj~>ct a a5»c MIST Ar«a
daa 0'I a
I« ~ «>1 ~ 'I» 1
~ ~
~ v ~ ajj all I >I I
Af ja > ~ d I«I, I},"..
m.sd 52
.IQa j>W~
la>>O»
) I SCCOI>
).>ttjlati
OSSS~S~Md.<5$ jt TI
>$ 1
rls.dd} 2'
ICCS I>
1 se. ''-.r II
a~A.~ ja>'Iat ~ ~
~
A7jtt~3 ~ I j
~ Ila aa.
hr r ~C jttdifa
FCS <5SI>11 ~
) gI~St )j:IR~g..=s ~
0I5 j>e»S'
I">>et Ijae Itic'pl$1 ~
5
'%$'. I»ICC
Sjva 5a. I. 'I ~ ~ el ~,
~ ~ I ttta>
~ H Sta
ttfjl. $ >.
5
JC j>I It
~ r jtat" 5>O.I}R
1 j"511$ 't>2 Pgy„ i>IS C Iat>CIatr>a~ t>rlal>lt>IATC>f
) IS«
I>I3rjt5ZI'C, Tt I"ISItss>a
~ISSCd ~'5 I>AM
jjltRS, Ct Sdd} 12 1.>a a.ga r,j
* sa I aa I alSt 1115«j>a«t+~t IQ«ja>
>Q@Qg+w -'."' j"~..««4>«tie..a«a»j~e.a« lw.v'R ~
|r-) .I~ )Cj>O I ~ Ivrl
Cas 'c.f )
Q-rtjm 'a>>tv.r- CINSIII lj« %el>C>>
~ C aeI,ct Sjtt.l>TE
~ '> 2 «ra 'AI~ ~ewp~ vt.> ~
at I~ tta>15
O I~ at> 5
~ aj ~ 5j,) 11 aga>4 g
{~g~ I
~ SCIOt>
5 5, >C«O'itI
I
STM Sa«ad SOAK
5'4 II' I> *'a'e 4$
ea IQC I>>la 4 '.a a>a
~C ~ Sdf 1'ia'I >ala ~ tf 10\.5>C 1 ~ Se>244 S I>a j>et«S<0 l«11>t ~ 4« a«1 lf e» Ia I 'lfl~ Oeaeie~ vl I~
~~I Aff38} g.. 883 QK5 OFR&. 8oftj, iOZCOdurS~8I~ I lda 52« 4C>a'5>>5"CP
P G g fQP Ojaweee >jt OWad
I04626 3IToit ~>of ACT
jjV/a> NtQ
Lssss~sssssssssssss~r5
%7 7&
RepcrcoECcasrc>v»
™ STEAM 6896SRAIQS<S BLOWOO}s>fN SY5TEMTO \2RC. <IEOI—I
'! Q~PICVV) ~ > ~
~ ~~ f
ae I~ ~ I~ IW
L<C os<te}CEPllsc
Sa>CSS SNef MIc>sr<C rcoses
ea
t
I;I~
4 2,
I ~ ~
t
I 4 4 ~
!cT ~ 4 I,Ca
» SIP-
IS'I ~
}5E !OICFIE
V><r»rr-aÃ2.2 cv IQ
4
COC
~ I< 1st',I ~
I ~ I~" 4 a ~
~'} !
te>A<SO
~ '
1> ~ ~
ts ~ F
~ a ~
4
I 4 s>e
e
~I~ '4 }4
area Ver
~ I- aire j
I'
Y si
Os
f.-ccir
14 SS}» aa)O
Q(ye's
~gMIO
O. S>P-
Ar>aca ~ C'rrr.cc.h ccav ig
k >SOD ~ 4CI4'>API 'V21 (
~
Tel�>4
~
r>IV!2 I4
IIO VIc a>}2 J>S I
Ai
I CA>A>PO>ra a
c
lvaosea. 4>ac
>F44 > DA
Oa'
5T Fvr}se
C>CA 0*«O5PAIRC
PIIO+gPlls VaaaO>sr
C>CA>CV»>aOVOID>CO
"~ I sa.c ~alai ~ I Ii)f
'"4 ~
>~IfL a>AOTI cee as»o oo>ac»ovD tech>»se
socscv cooe IDcrscca z(ssoQ Jl>ohcsc
Cl 4 a ~ h «Ica»I 4 rc ea a ca r' Iat'I
4r r" O '4 I 4 I
~ 1 I AA~vo Ia *4"IV' ara 4
<.v,".~ I~
~ lI~
~ IArrra earE
'ar
4
~ r I ~
~es41asV ~ I
~ ~ ~ Ilea ~ ~ ~ r
r IIII ~'Ias COSS
AO ll~r
~ ISar vs 'Cca
a C
ra lfll~, 4<eatys'ccO j)P
I 4 Ia>trI
III
~Iai 4>
~ Sl~ I~
I'r
Aa'IC. COeftaare TC
S AOI'j4'at 2 p ! Case>4Olt"aEaa~cvlascsaasllartl
Sr
4 4.4» I 4 eeC DC<ACID
(I Tatlg , CO<I~ 44aalal} Osatat> ~
ES
@OS�>
r Icacr
gascE
I~ Of ~C'r» akl.k'2-I
~ ~ '5
IACEI
4 casa 2
(cC
IA
ja>re 2~ 4
I4~ ~..-e~nS
544M» cat4 4 I
ae 'cas ) ~ a AccceocIC' >I ~ >I AA>
P}AT Ica>ra ~44 r~ ara ~ aECC>VIA
r4>~ ~ F }>~ Sc
~ alai St>D,}. >rcaOgaej>I <
V
C cgtc/
, r4> ~
~ e't ~ 4 rr O Ct'IOT> 'rlOESC}a ~ I I Cat~ ' ~
~w'gQOII Dr~re>>cs a>+1C
e;4>OE 4
2. >I
<IOC fr'A»sf.t)S>IC f}s>as>CL
oaoa)o>vg sacer»ca>rS}ELi acavtlca «w
4» (q'e
s'I, 2
( -y c CO! ~o (-o
e e-al}S i>IA~ atK»4
41Ee ~ hs crc ~ac
r o»O4 gra OW<E.: rueeSCa ~os<SSDPu'~ /D2POC RrV. 8 Sn f--.s s. S.~ Sa a>l
»Alt I ~2 2->t r
41 ~ + v
LP. G. 8 E.CO.
seer y op 5»ters 10 MS
1
!'l.
<4>j 'vr.+4I
RIS >>SGEXK;.EVhV V ACO
DRAIN TEI REACTORSDc<LLsrt Iotr<oi Ttt
<< rc<IAIN TOAt«<C~'ETDOO!QirsL CCCSr!< ~ TIL
sls Accuirr. 2 2, )7 gc~
PRESSURIZERAA
CVCSEECESS &Ooo!II
Cothttr TO RE<CTORc'.rtrhtsT cra3< pREssuE!EER
RASIS ACCWi. 2-I
o or<o
~>~BIG@)<4 <c
5~4 SPE, '~~c 5I6. BIT. 5424bSSC.254:IOort.'tre
5 5
E255!osts > E
to'9 ~ 501. ~ <at<.
($5'SS I >n
ASogrf
00
)00ST NOTE It.DTSt
~LYRE
I
1 Y~S SS:INBSPJ~rr<;TE 5
50$ 2A c<.~roy.
NOTE 12 SOSTA
IPICTORPIOTE 22 tt'SSSSPLw Roc<0%
*c <
L!Sor gfctL'~: C< Y OPL
,WC< 2 5SIS,SIT. <o'lo Y
IMIS+ stooge.~N< TEST+ j 5 0'll4<S'ZSPL
';S 505913 RTO 0:-f;4.cLOOP l,, —.„,,,~IQ ~ct
ll40 2 5PL
~t<otf <5
~IIOTESljR
o coo RTD KRSTIIRN
c l (c2350IISI=- R > LD Lte-I<'t'" src.orr Rtts ROT LEC
S lt~~kl Tq, Pd
OP23-N TEISRfttrRN 50+5
5 'I 4'1 SrcL
c "'Z " "o~< ~risrLISV<<I,to <.~r<
(Irttai 1
In»IXS'~OPS 10 t<r:
srs<<oC SN +RAtoR''2.- '
IIOTC <3
OOCSato«$93T~~
54'll44'z-
!Si'q:<tt I SOYAQ,)
StwtoCONSR<roa~-".-
'tcJUP<tstsSOSSA SIS.SATCTT IIIE
PUN!t wDISCIIl9
So<os (rg=~ <
I
4<co=-o==ero'o.s".a.
= I.*IE'
~ '<c a 21
: (
costs
00<lutrOO sot i~<j~
ASS ISE
K
+o
CgRV.IUCI
'I<4 2< Iy~I
I+.
+QE
S'SSS OSSL
IS SAFETY IISJISCll
~ os RD.ROTE I~ USE» ~;c!LEI+ I -~ 2ICT<t'3(r J
t
'6$ r='~to.= ~
~su<g! c
4<It<I<STOA ~ gc !ACORNS
<clVOI'I~LCOg t 2"'or~"'t~ Ax@8&(STHSTJ~0+54 -
s<
205 faj.
<~ doo25 -7
toI m. cjt
NOT~ }4~SI IS&SPL
33'T
'0 R EssuR!2ER50RSE LUI6
StsootCot<0!<A30R
0 "trav o0 TI~T<g
5ootl o
{~+<<<<J
kOTQSjSosacI,I
SS
JC.Se2 0-SNT< a
RE:ACTOPI<r-cT-.=c
56.NOTS fg
NmyMK +'~ O'S 'or ~
IdptotL~<I
L'<"t «"Y gona>PF 10 PRT.. le<03.
S SSO140 RTD Rt OR!I WD &L
LEO
t trotC IO I' !I IEOIIY* '< .1!49 ICE
eoOSC <rOS<CS IcOY< jgj SS 7: OLore.!g .. C.F 0 Io<T- (c.O<10 ajar~ < Nc1.C I~< ~
RT I< LE& I»Rt RLTURII EOTQC
Q„
RTO.~<o 5009 C 0~ 08
2 SSPL'-
JICIISS+~255+SPL
SS:25i:S>Er'IS.SAPETT
IHJPURIP Sc'h DISCIL
LtCc~uS.R o«~~i
8069D Rtt<RG TORts!OUSL 01
IT59 ESP! 9 PS.SOST IOR~ tT
50T
T81sc !90r'IY sPIr<lg p
~LO OPNOTE SEII
4! i>;el dpi
LooP 30'PLI II t 3ESRL3elS. SIT:
Lar<S 5 I SP~L
QA-255 IOSPL
~ 5o %APLR., INSTALLEDOO V~~~Pl cE.~~Tr, ~TIONm Cc'4 7O-a 515
+rr0TE-5$ ut
AD~5.'.
25'<IIME Osho<ETER~ RL dr troDD Due J!TEII '~~-"i5. 22555!PE Coht<IETX!IQQ)4 AL'o<rITEI4 SRooEERS <R
RCo ARE OIIAvlo 'lsIT+tiTPRES(tr PSE RC Rfrf<O .w IP..
b. EP<rr<t LMO~ QQ) If.G. ELLWPLAN0<STER~7. Tbi:T FIFE PLICM'Ci!Err <5
WIIIIPEO<CTOR VE EEL I!E~WCe. >EAP Jn"-KCT ISPL~
Ttotrb FIIRNI ~~I<. T3! AohcTrg t<Eaaa< ~
IAISS99! 2aa 0
ICTV.
EOSS <» 0050oI05.0D.dl APPED CLI
8S(r.fg>dSPSSC'25rc ONbc
II
cvc6 REcer4 .HEATcUI4 dodec co<50 CF Estr,
< Ot<z-sr«O IIALSCP REh O<r CYCS RESEtr HEAT
CCW~<FIF0t<3 CIN45 EXCII.<tLT CHARGESAWZ rO PERTLY. ~~
(X<LTPD /~;SPECIAL L K INESILATIOtr bE
'CONNICQIOMColo< ~»c. Rrcr~~Rer-. TR ACTCSPL COOm T Otg. O -Sk.>
ERICH OIITLET RORtrkl6IS A Cug CHAICScl!4C
~ 2+,REF: P<TO.gC'g~tjL'
OI PrtREeouceu war„ruRrpt<9 IRLyb,~~ 'ATE'LO
> I'A".<T'.<or <'E ErftATIrrMOF REACT'% > L or<72XLEORES< PRNWi L&~AP<PtÃER'JEIEE<raLrr<PE LP'0 FIIRQM«D 8Y((VQ (tl9PECTION
o<rF< <AT<& To o «< IIV'v'{ÃPE ...I'TT.<or!
5~ET TIO. S oF 68EETTo
.G.RE.CO.DRhtt4. <O REr<CTIIK
D IOAWROC truo!ISER
104628/ 9 .'t
lac. Tb'a0 TO 0. RRS STA«rrtoaao<.s <ca<.av
6 B 8 6 66'7
6076 A
~ ~
8078 3>
I
S'
YEQTlhlCl
V
gite. 7
l807SO
~ I80780
~ I~ r
I
1 A»'l)53 R JPSI'T5 AILD )35500.A> 3'0 3'is.II&S>10>IJII 03 ~ At5 5»E,S ~ RE
SSE57ol»$ *0» - >=VRL'l5>iEO JL c55 ER'.>J>5E
NO>LD 'sr ~ .",g (5»: CL I'E> ~ 53 uzi'4,2. CR AE57331 Q»v'JJ L JR J'5» 0 R ~ 0 0, e 33 3
~'3d
cilT 'JJAl.l
RO RO258 254
WIOE, RA'UCIK
&22IPVM>5a VIJIJI~)
~3< 5 >s ~2>I5
1 T I:O'RROES
1321 RAIISjE
> I.P.
80sj:I
>sI 4>r84-3!>r
4fr85 3/31>
CAL(8RATIOguJACCESSQ
v~<f7Bf'/S>I4 T78
s/43
ill—-J ~—0»I
4&pl 3:>b59
~ » 3I
59
Hl-VOLSKIISO)
ll
au. ), ~~
3-~5'5(a>3rs
Pl>ER I T
Rs>lip E 319
:5)I„~".C~":CI 3@ii ~ OR.
I '1~ id)
"ARRChfRC,I ~E
w'OER)I'QE
.EstIear'.P5RII~I.'I'4
LJ~3& 511 Z~eh
TRAIIs-8
>>»
3/15> >4 4r83 3'>v59
TRAiIIL~%?N >3
RE.ACTOR VESSEL LEVEI IM5TRUMEHTATI0M VER 5VSTE I4
Rc> - OC S(i 3200 82> ( 84) ("85j OCO EY 8>I+R2 ( QCO EK 5r >l ma+-~eaeoeN-ue>7<g gs>3 CsIAWWC NIAHKll
oP sxsns 1 046 8MlCstCFIIM
IOO IOI IOZ (03 (04 I05 (06 I07 IOB I09~ ~ I
I1
1I
II~ " tis jr<F
It ~
r«2II
I~ 'tth< .i I '2f ISg '.I 7 v ~ * I,+it 14
7 h»C
»KC h»
~ rlr
~ r
IS « II<
r ~ 14
(Celt~IftgeR
(»<IT
t(CN((OC 1.'
5 ye4iZ
I Ir F
It)i ~~ ~ r r ~ Il.
! <S,"SltL''
lctfcf«
FSIC!I'<<C4 ~ 'I "-
al ~ 0 g'I ». g.
r t.
h:..<J ~,I
L.<-.%
I~).:-N It<I
)IIF r~ I I
I I lt fhhrtitfC rh+ S»lit IIr' J.' 'rt )» r 7:" 4 ~'reerA."
)'rl ')I'i»4 I cl «, I
t)IE Slt Ct< r Fr4 F KF Jtt»CI"rtnr .Shunt. ~ )FC. ~'~»„'<<<<IF F)7 / It* < <,< hr»r
»< C»I ga ifI) 4 q' " rltIlhi I E»atr! ) ~ <"'l
»A ~
i»1 ~
I
c r
I
Si l,l( 4I
.'1
'< sr
I'ihr!IIllSABIR I NOTES I Irr:r.<)I<RE<»,„.y,w!I-„t
h<r,trrra)aa)cc <7,H ( isttetu.~fal~eea,AE e
ARREE IS ~l 112 S<O IVCWPP~ Ittfute4 [email protected]<4«VCS c»1, T~4%< I~ I Q)ti lcwhftha'tie»»<
5r
, I
I
ttV455C / ««RE')1 I
~a II~ lI
!»<1 I
'I<I/ 4liil~ ~ rl„»C -a 1» I <! .
~ h Bl»'»\ I —I IA'»I
t
~ '1
a
~-4<SR.c
~r
l
'R«FEI III<+VS'TtIR T.
y
Ce$ 5L
l~ I
54.~ I. I lP IIIII4
<IVt
< r»I',
OIIL<14EPI
PRESrsfSREZSR M
»4 2
» tl~ RCFC.
C .;
~ h
I2h<
ll Illat<CFI Cttl)4f
h'tt
II oR.fc IICOT
r.
r»<r
I«th) IFCCta Iaht ~ tat VA» It/I" FIF'r<IWI<ta<t V&II«4» 7.W
F«tlst+IIER tthl«F '41 \ <V, IltFtst a»<Ital t El<st»halts»«tr«»
vr I<Ila I»)<a 'KF ~ + Pi Ir)r<w~C,.
It<�'~....'1<1«I
~ I <",r'h lX- sllWr Q K<~I X
.,I.TI<S»C» rl, C I«
I I i «F~ +
') <» I<C't ~ <ic 2 ~ < IlIhh 1 I Pal
~ i<2 )~E — ~
'.'~t ~ .. I ll'I)» I » '- ~
Crt<sir 1 7< N5 r'r
<7'"EI "IFtt, w~l.'art)«o
I
ttr IFF )<1)4 s r<I
711 <'F»FC<I CRI L I Ct<)Itl E'.i ~
lf rf t<s<tt.h2.»a'I I C<V4 I r»
1 I r ~ hl »»FI
Iht«4 IC 4<<i.
~ IFF Ic «7I«t'I
~ IF cia tutti»a tait t<c w 4 "«T,
(70't%9 E( VALVE'CEAIRIEEgEO'aCA&SOP ~+I'I IFa IC I<» ~II~ .«<CP
712 I - t» gt 1»!QJ " 'gIII~Elm Otcl6 RtfEO CRRoa 12IST ~75((~+
Al«4RXlEIR«V
P g g,ggo oes~P~m ~(0~ ~a 104628 3
Rli IIIDEXEC REV.
00ZOl)))) )12 ))3 IfS 06
~TO Slhals NCINICNIATIOI
ICTNICIIT LDF I LOCI' LCO'I LDF ~
~ac lgtlP
DI AC TOOCDAIASFF»at
OT CAAIOTCCCAfCC
'4
I ltu1ol Ta»roa
t Ttul I~ Tt»Ill IT~IA It~la
~ a CEIL TACLD 44saaaa I
5)fff)Id.2fPl
~S~k SAAA
t C~ot ~
Lol I I
Aarlt4 >~
Ioaao
56-la))-3SR., ', Poi)4K IAL OIL
OWV .am')4I
aatrt IN IIFAAP a)
Lal ~» td, 1, 'AartaraarWPDST4
Aaalctw „I ~
lrsa 4CIA
0'll Fra) 14 ~
Pqf4 ACTS
WC
/AIOTTT I~
c:
T T
SCE DCTA44toau
C»ALTONTSDCI
tt ACODD ~4LDAFIDrt tttt
Aarrc f4
I lt IIIOTOFIFAOSC ILDSNII TCCI IS
lt»OC Tt»COIt»ala»II
ITol TT4a TLAT IICI
Iaa I»I41ol ~ lIANI tlC Iaaa fat»aaa flatfrsoct area ~ (iir@
A
oat o scr4CA) t +os'ra,~@ IAL
I'Tra0 Trro
Ieo a
cccausa4I ta
NOTC 0
NOTO T
mrccg I
port 4Na ~ SO
SO.TSO 841P)GAL O AL). OU OOPS
TDDLD ~~N afarrauIfaafl
LOOD5
ltrct~taANISL I NCN NIC tlINS OCLOat Ct Cfltt COAL ~ITNAICLDCTIC ~ ITN faa flail ICT CCCTONCI ftrr totolarloc ooAD at IA ocSNC CATITAL ILAC
IILOPftt
SS IVCIP
Qruc
~ .
~4lltO ~ Sa~llST
'4 a ~ All'IAAIa Ol AN Iaarl IaullfOLOLwL uo AEISFE'I S Lwt NC Fffto)IICF.
I, Nrl Iro satus LNC crttsLCCllt IF ST»AN IF OACC LIK, LOF IOLf
t, tria NNNITLDAIKNC AIO' OIIUIOAI 4'acaND wanao crrcaoo wacs urc.
1 UCAIL AOANINIIODICLATIOIaaaats WlI~ Iaaacs flCI WNIIOD
a. Iccarc auccrla e IIIINaF ct tctcl1aatttaat
L NL altars ICO'ltNC CO OC 410 WNIICLiCOWL W'K uaoaakt IISAAIIOIV 10 USFNrar rlaats. gQp
~ . ANaCOICO 10 OCCT S.IOTC ISI, IOIT 10 SC IICTNICO 4T ININIONC Nal olllN
41 Ia IOINT,u IDCOI lt ICT LDI 1 IIDItlK ItSTICW IF CIO
~ 4 10 ~ 10 K 4 walcu Ct 1 IltTS. LDClla IF CIID Ita 1 ICN tlK ItSOCJN It ATO
a»NIOD C IO 0 TO at WNNN Ct 4 fttr.gk ILD»$ M NCLNADIICC ~NC Or talS
UÃTNC COCCI lfKCNCO Iat aaIL fl»NOICJAN alt Ct llllts 10 K INNADI 10 Sltt IfCDINNO.
II, TALICS ~ IOI Offal 4 Krtt 10 LITF IS Krtt10 LDF tC Itrrt 10 LDF 10 Kfta 10 LDF ~
ALII TSCI IO ~ I sar Ccraatuora'Itacff tIK Ir Tora ftcN TILIC4Q)
ICT ItlWNIRLDOIOONCC
LOF I LDF I LOF 5 LOF ~
~Sac ~asmsa Tart Aca Jats
tIOIaorlto LIK
IICN 01DLIOLoc
~ItlstICILCIUK
I~carol sl3l~» 4) AIIOPDLsosa AF
<KB <5HG <K2h CH5>~7Ss sa IIKOADL m~u rrfc Ic IffrCCFDAL
C?KR> CgK KRso I~rsr) so Il4fCFL Js I»r IDL JL urtroa
(ip (gQ ~ (@pDL I»l ja) so INTIDO Da uss JDC ISL»OADL
,~»a )~CCOI ~Decl j ~er
«Itf INC ftSDSg~ St ~tF,SCIDOtW ttstl))DFLI"-St 4 tatty.stork) 4St Cist+
St.ctft /4JICIS2Stets S
Stctfg
REF. Dwc)))cs srsr iopoy st P: G. & E CO.
Ii I104628 3 I
RM INDEXED REV.
12124 12 16 I I123IZ0 IZ2
~AI4NAlf~ma>at hrha'I
="r-r,'
a r tdOR,!.
lCt}
afar-'-„y
935
~I . eaeeee18881w54h
~ ~v"-i ~ 5 V3949~ '~V~8
L IQe aT> 5)5 tsar R"....~~rtI~I 885 t
,<PaTSI@~~
~~
} }at Z
tctitted
, 4355 %8&0-.'::4)Tea Qlg}a
i . }te }sa'5 It
prd N SP4AIstara 8 rae
»g1'~e338a>C Qt'+»t
O e~Qe'
sr gas}'l $ 354 +g
gas
I
~
''gc '- CY
IvI ~ i42
ca~L'
~
5aeh. 'pt
»Iw g
5. 8'
>8
~gv.r«at 5 I
(4188>gg gg} gi
CA'gs 8 d~tgCA>Psagh sc9>aA}..~a ItT.}Ta5C»}srahaiMR
j8s~sgsmI
W~~asa
~agaga~g»s ha ~SCl~~ 44~ttah Cj
ts.193590 +~ »
}(9359CI tata a,
»88$ 2 CA't.
.'}!'
ji".~s;38TT .QRSgggg \ W~jraa 'a 8
ss
h IT
i rtah
~I
4 ha swat bI«~ sfs fa>rr»
. )'P}','masatp r'.
I[
YR
88
1td /st.j.p>gtadsr"„'„'.
'rag« ~ LeA>(et% par»gad+1CTICC45 Lhasa>8 ~ ~9taga h TC tg 7}}SA>T CRCI} W
8+QL I RC Fa~~<~sgg ~ 374 % lpjka
} sga»tet'wg dy IF.
et}~~D
8' I
'„tUg[49f'+
C
itee
TCde
2 } '\ gpi
pvVih
Tc1v Tss ': Itri tcec t <~++jr1're32d h'8 Sgha>2 pes CJe Q gg.g>.J
a*tet~
p4444fs ~~~rgusa heoT'4ITKt>I
44}cd'5 4
Q Ra&re la. I
s . ~ +) ~, ~R 5
~ 3tee
~~V l t«T I
934530~Crt~~~XC .I '»t- Tas»sr A»or«
I TC gr5Ct3rg'T99
Crt
33373AA l»4
g344>2Ifdar
}N.T'Sd
552»
ROag C tgARe stsa}~agsrt cgectl.
hggf ~g
agv ~ a»g
@trTss 6 c ccelTllIr lacerf'g>4 ~ TXI
8»945>5»55rtgs
RN
Jt g ~
hM.Ts AS
I,J ~
~78 ~
~ .'Tsaa}C ~S IsC}a 5 ates Td ~C ~~»C~SO+ >TTA3h»'stsgtC. 9dTst
94..855 PirtM catt'JLd 9>4 SAC»ed de>hagi»a'
g a R5J Jgg T»5 Rwr 5trs 7agd CRA»rS A85%})T}g" 9TA} T»CRasrg«T}ARA.SR
4 5. trarcsrt thA>TR a.s 4 Tgedtga T»c tpeeecrrs-TReg iaa
T A.'n hw94Rsdr cv Ta.ma e~~«}7~7I:
grdrttrgal
ee
ha~ha ii'I
~Ieh trl
SHEET NO I8 OF:" SHEE
P.GE F CO. Q aHJ5 I}IW CHAM@
l04628 I s'II
$09EDREIL g-
»fv 822
AS 03.09.8I sAPPEP CL 2 CII0>5 OF R8V>8I 0 -6 I ~ r3'TChst
1~A>
pzf.pwca. sos cycsu ooe spa
I32 I33 I84 $5'SBQ~TTtr~OC'C$ 5C'0 liI Cal CatIR
a ~
)aa!siea
$34tSTCC, k%ACTaCIaysp Taattlttel!' c4MT5tcgatCyf—&Rota
eaIAaC4tICI PtIIAPSQt~«~at tIZ) I
~ZV~ it««TeaTS S go5
Sa I R .Ic itT
/ IA9 ISSCtCt~ 1
2ISP
il 5I«4aS.SIIP
'Ytai V~» IC'C
45P-
5I~ CRP«4@
0p
BI52, 5'255~,)~<, e49e
Itave@&
LcgSLPOOZ gilp
$4-255 baOTAY+7 5i@--:$/
5 34 3SPI. ~ '« '»~$t
ItCatc439 LOH40 ~ )5 !ASTA 0 5 tA5aa'RCS ~ 5 'S.T fata g4 X 'ta
( ttia~:t~~tays
~tCv«$1
gg 5%-38
iCiÃW DlTC.OI
fCL~P~TI5
t «ttat'«L ICttttCttio tataC. Ta«i«ITK<ta~I c
t 5 ~ 2 lit«a«Ioct!c Tati.ci
« tSatQIT
iota'o'5 IcacTofT ToJtt$ c. ca aa. I aa$
tC
VTia
'K% T t!g
54Oig IaCtt SS 5$555Y TSO C tttttTCCCt 5,A
alctaaatrt$ $
t«.
8 ttBcI a
, W'%39
9
+SIC%'br~'e
3$ c
TO Sal«TC3STSTCat
To taatttaa5TCttiTtaa % 5\
Y IlitIITItul Y
tMIX BEDDtitiIII3 IN'al?i
I Sa 49tBP
eIB
II''
FAIT
Uali t B ~~~ ~ CHARSTMP ~C«g2 I,IaIS
t
TCLaatatttXIe~aaTT TattRI I
Fiaattl acsi. tIA'<Rcatc,vatt tt 54thOCITLCT
Ctrl W~Tt3tt $O lCT 453Ttcloait;5 tta. vt ~~4
z TT5>$'5zs co+ lrva 5'5ttal tsa'ia)~.L5~iutc Mtttl ~ Bs'otIT55 a%at«et«~it4Il TM» at!tata TZCAYICTr«PJROaSBS. CHIC~ +4 Tlat«$ ttt«cC!co Iti < s ttlwt t'Ts
kf «««5 ~%C
REF. ~I'vGT K Q~EIO-<I''(ls}(iEll4[IB~1
T Sl '~ ~ I<itoeai'2D Iri .IS ta>attTc..45attal Ia ~:! 3 P aae ~ 2&STttl.~
35 MIM NEO
RM INOEXED RP'-P G.4E:CO
GNEEl'mls 0P'RhwlNGHLPhIM.'R
104628 3
RPF.OWE<'. CVC~ &IS't IOCu3!85IIff R» >
~ ~
P 00ZO {14{7 141 14Z 143 144 {45 {4{- {/{T 148 - {490 ra ~ ~ I > ~,
I J>f rv I«ar>0 X4 V«r 3>» C ~ ~
>0/AvfC «VC ~ALr0 M I«'JC>>«r'«vr S 'TT»C J>$ . 0.05 vcc aaJIT
CTI», C'TIAC «IJJ ~ 3 0 JJ! 1 5 tA 0 c>CCTT30 JJ w'.I»» I.»«c c> v
v/I 5» t 'II J«>v»JI'Ov)l '5 '4 ">IJ»ctc'0'>VP J VJ TV )CO I> 'VCf » atra f<VtP+r va'JS «,pj ' +>«fr«»''5 0» >5!
4»«gp')C~T
Vt Ot JV' ~ ~ f0«»> ~ I I,V>~ „Cr«'>V C»>'I)its j> J>RIt C>'t CJ 0'IC»)0
Ri>l
r. CSWJJ »;>7 ccfIl»vcr«CVT I. Ja'
~ '>I>Jf! cvvJ, ~~« j«0
J'0 >
T'vv«aCTCU
/"@+4 .\
I)ct'I'X >»'Sl«VC»O>JCl'IC Il>~ If»ac ra II«
a«CJI~CCm> . II I
l3'ryr, vrrv 5 ~.- t
+01>
I t+v»r,l> T>+ Iar>+
~f
Cf lr»TJ
Iglr I~~«.. ~ I, ... flats
r Ilk
»C~v
33~«TC II'00000~
5&258-fr 8488r>«J'>V ~ >V TI;)T. 'C>5
I 51
tXHl'» v~ I J ,0>3C'N
M««r«0Oca>101« aaccf7~ l/ I
aa»l'«0.)J&>».~ccr «fitX/r~ 03
~ 1 Tavr «3~ »> ~
m>vt C'tel. J >» 0>IJr ~ 1 0 0I tv«v»>~vg)PIrI ~» '> 't IIlf . VC 50
(=i I""-"
I
~ Mvc >Ilaw~ ra) I;1'
co1 /JII
v> lv)A'stela«a> 1»>0 IO
J/~c) St, ~at: ~
{>30!
Tr.>r» 'gr 1st >
CCCC
7«ICgI/CC
Rt>[
"1 ~ a!vrc',-,'
&It'cr I
«
g{5'
ar ~
>«uO
15':L<m>
S759l
C.bWAX%J,
I
4t>0 85798
«NQG'.-'Tt
pew f ' CIC~ OOO «Ct
<, /0CCJltccm .-'aC$ I8588a'.g ilg
gg»O
~ ~I9r,! 837
5684699K»«T>t>IRsclk I>ICO> ««
ASJPNCCV«>S « ~'4F!4~$ 5 Cj/C 3SC05 Ui 7~ Tc. 0»'«I> Ftc> ISOI I> CC.
TJ VLgv >v
~ ~«»kt
KIT ', '>I57.252v'I
~B '"g 25'.-rPg>C »I I / gg -4 83773 . P( 5 CIRC550
SPRAY
ccoccCctaD«s II0>7 .'~4I>00 TTIJI
5IRLLItcai lreNho«>r«C «5 1;0 'p v
ccrc ~ ~~I~ RV Lt
K+Cr.oftt~
>)"vtgclCf CCC$
Ilc 8 a "Ci jg —.«>/ '«>!St!
~\ ICSCIJ8384A DI ~~ rv
)XOSCTC
q EECvh4
F7 5
,«~C'
II>ClIv»« flea,
W7P.
/CIIC00
rll»PIOC.v>~«> {K
CICC
V~yM
fecal $ 0RICCilc /litic
0> !C
OC7O
I!Op>
Pl
~Y'>CJSZ-73-2K
{ >3 I /'$1(I»'IIIIIIIII}g
«I!CC.i»t)
a30O Ip
79 V'-G
SG 1464-2 5 lt vZ I> "5«'»«
t5 a«CI».l JITI.TCJrvr>IC
~ )tra .ra~ «CCC7SI8
Jf 8<398ID«" »
R
CC7/gltr
COSTC
I"«1 $.'i
"..{«4E< '19>SOgl >
03.OQ.S{ ppp9) Q 1CIZ, ~~ c9
tU8tb e. "~ V'~-,"»1 <R.~t.:<-.'-..IkF. CI{f
$C4 > I'lN ) 1r)«7 SCIS«>56~715 RSAC 7051 COOLANT ~ 7/CP4 7
E /OCOO
P G g, E {"P OCJ>fcig !CO OWeC
104e28,s35 M!M{NEO 4Q II)f
RM NGEXEO RP/.
/5'2 I$6 l59
A Ai Aeee
VA"XA '
LLh
gj ASSOC
~ ~e
[r.
ieAA
L
- ee
Arie
s+~ We
X A,= ~
S e
Q— =SC L -~(sSj7gg
mLOCAL Oe-
(sSr
=(iiz
vs ses seeeeerW.SO, eererT
C
A eg
sz ss
e ~ ~~ ~
A l(sii
e
~ r —CoaeoO
A
ee
gsss71
IA
7
szI@A>17PAC'II6 OV OVID Z.
~g, osAA. csws (oacrosscag 5 S~ 5ZC
AI pP OSOS.Ol PÃQ Q 1~p a~tw o cd.g
P.G &.
soar)5'C@~ Sag aSSAACS
-.=" 104628
l70 l71 17K 173 174 17f 174 177 1 js 179
ii IL4!
+~'-g= @ceo'iccosi Q IAIDC
'~~>'-"'i
SSSSa 2 '\o»I
I, $055I
eccceo~ ."«~r dc«CII ~,L.'SSUI .s s
IF„
I, SHNtite ~44 eec
~s
P.~~tSS o
ttIWi>t;.; >i*«+
$&tttt I
~t TII
t II
Oits5
rC5%40ITI
IsOTCjy
)pgteooeoeeccoecc
TL«
, tttti~s " .-Ats
$6 l»SD!t QN dettS4+ e+ H ~4'II«.<P*,'t"
-IL\
3
r« i«
. Ctt
O «»SOTSce«O LO6
253< cTI-!
L» ITO
L ILA 'etteg
$6»5$ $5$»N."
'OC«et
COLO TI
ooooo
$6 t~ot!.
'ss'«ss'sts'" '
SIS »S»SOTMOO' 2Cpa
' IIOCLD
SITSOOHoSTL
Sc 25ts-eo
I$CSC sOLPL O »C!5r".-',$ . $6.Coco-s ~
'tV%Li"'-.-~TV~ 6 '-.i'll j
C~:I',t».Pq
os'esrilAIQ
gr,e« /St«»ITO
«Tgt ',
t'IOI
«d«:.s 2ccrc, ~ttsgtsss
I'SocH-,";
c is-TLjIet C553 P C
,s .$ 1PQ~»i~t ~ I IQ!s
OIUCA1'oI YANIC 2»3I
toC'4CR+
OC«LMPuglIII
6CCUIOULIIC%'
t'ilisigt«6 s»)
CSD ~ILTQt OAT (C~A Qi I~I!I
4 I~i 4 yS 'DI«i si'Lr«slie»to TOIQ«'I
~o q~ ~g~« ej-:=--:so!241~R~...
K3850DCdetD -I-~~:SQi'CC-I
I ttfPQPT~pL!!e«\I+j«I»CItcc c«L»ssIi .. LAC>OOSwp+tr5Toit
SC.SDOP I
c pF
tttodc,T .1
tD LULOUOC(fjSdtdC 1 ~ SCCTI
toSa,'LOLs« trial.'Is s
KSts!e t«;Ig +~III
~ »sit
++tiltstQo~)
s
ItVs
Tt s«
» tm+tg~t j,
~u;
Pl
ted't C»O«I»I
~FIM,LOUC
Bc-a5gd-y~I
~oeoeoeeooooeeo»STrsdttC h tJ. 54 524-
SqCK '<Sg,
SG-~so
foo~MfICI
zIP
$6 f55 lo
SC 25l Py~ fit
occULO FI~Uct
CIS 'teSt useI
SC ttot+6 «C NJal etsso4rfIJQPeoir OISIU ICsC
CC«»TPuJAI»I ~
coitSUsfCO»iT6!Lt«iCOIF
dlI77c o'»cCC I LIWWIT
I tie! Dse
CCOITa
I FS«e«L«
452-$
~ dARt,
.16 =)eettD.,
:—.«"I'" - 'C-,452.$
t. s»LL?SS.ITCr M 44-6~.'Ts«t«T & c»4 t«ssc ol I ITCL esoccs >io LT
t. 4p «D ~f '»'4»e ~~
»L «Pr r Le»»C re@ i-
I 2403.CICI»8t ADD&I Q Z CH65 'OC
i?Rie, IIIVCC 10'2009i gg~«Q'I .SIIT
4 !»Us»srCrt. ICC IS i OehiS
P. G g E CO, ™Wus>0~628 ~ I
RM INOEXEO REV. 35 M/M NEG 1'3
Ibl ICL4. WTR.FROICI Vi TAL SERV SlcP.
fIO6
,z xa
iris''P'4~ ~ I
I.JI
LVSE 41 I COOLEIL .'T I 3gl!1j
Al
- —-~Zr)
wj ~ gSE
««J>+ +r«2;O
~ 9I-I 1
II Dec
SEAl.
2% % Kl9273-8 0 S
pEIZgHO W HPR-.A, PE2-I . -e
C~ ~m REtue4l4KAPER
I ~4~ii
~ib ~Z)~5'297
1 « 4EAROII COOIXJL
illIQO
EAI PLATE COOLTH5SLL
CHARIDINQPUMPa-I12 SEAR QQc~, rip p
PPI LIIS IH4 f. I ~
SEAI'LR'~a& 'I
TE-IJ.IAI+
:v'ro To R
E . l4I
t=—.~45 cK
+ ~ ~ 4
«rgvfr.p pp ~I'OJ
l '+c QG 6631IO 63
C Ehl7R,l FUGAL CHARCiIN6 PUMPS
:jc= VII G":AR GIL,Ahab SEAI FLu~gCLR,.PIPlh!%
CL4. IIITR.PROM '42ALSERC SIIF.pexz HPIL:Bj NR.-A pP] j-I
2 -C 8 C27 I I
1.
I27+% I-B
PEI2;7. HPIbB HPR:A PIIz-ICLID.WTg.tg RSVIRH HOR,
e
~ » C«l
1
1teri l -!"Cll
iD .'I c,f>2 I eel1 ~ 1
f«r Iv+ « Iwj
A
~ TC
1
>F. 2= .«8-1« ' Vl r
I«5, ~ rr 2 e
4 rr
'pjj ~ *
'>;MT'R, 1 OLOCe' P.
I
~ 2
Si.T D3rf.ts
pPS 95 'S1 291 .I.7S-=9( I pS. cd
ipse-fr"
4(gor ii Ec «M C".-% CSI Cacll:Ol CH 2 Psl Oe(RJQftel lOP«l IX(g
REF. W: CVCS Srsr. IOLOO8 ROlf.8.SN:5lCCT l4L IIO Ol SHEETS
CC-L fAP.6.8.E.CQ OKAlAW4
ioaeZB
/Bi /BZ /B3 /B+- /85 /J6 /88 / 9
~~g~rd 5-
'lt 4
R-'.tv&
Av< Ovtosalve 1 aaaaer
~%la +TAAANIef OO v. At&OJoarOOIIAV TC'IT M A O OCwto
IYear
Iltr la af I Q) g r tee ~ ~ dadtoaaeri Aalta Iaae V . ~ TN I~r~l' atPPJI ~
>~ ~La ..Qy~E!II'A'AaA~ Jdr SJvO rrr~ A Orocod o
~ I IIIII
S roaojItIOTI,:its]..8'
<ildebi tr44T m~
O~t/t ~
IW/I @O (
: II~% -Qx'l
v
~JC fA,I!PJ~~.f I acr lr ~
~I 1l
1rv Ia, Iq~@AS 1
III~RII
, 'I
(4 ~ O
t
IAI!I.
TJ r~ ~ TARS 23Jrtoe- CAI
~hl'
. ClAI
QI4
La ~aaa'il, Adit
rr
I eI ~
IIr
I I
I~ I
~ >$4 II
r p ~ r- ''I'a
~ 1
I
I
I
~Oro5 OO t
ratmg OOS
4 XWPEN IAII
IfirIIts'Sar.+J'~a
, RE~
IICEaa TSS
"I1
ae ~
4 '-WA' IIS
r„
irepc
Paa-g~OSO
IAA ala
T
cdar.o,rr
~OIC II~evNaia
ICI ~ Oaa TA'iterat O
'I ~ ~TIOCorioa
SSOIO OOOOaavlaa, ~ Iaor tg Sodt
a~COO.~ANIII. C
Osscaaot IIAAToctaoeaoctt
a REF!
jaa
)v leC ~OICO
OOAASS
V/ IIOTOC~
4OIIIO\'e
Aed
I
$5'~ I ~ I reeII
I I II Cato fr
ar ~ S I II
I
80OO4WICTNOIfowg SIArtI
OC+OSEG 4RC Oa!ot 4IATOIIOOOOLTTCI OOSIOIOC
Iaai
(tidal~ A ~
aaorAl
~ syaC I Vr"Iet t Ofor~TOIT colsl SEDSPi
eOi
error�'r
'IIII ~ ~ 'cr
af
S jX-'.~~Tae Oj
'
pA
veto
O I ft; Sweea ocr 0
Ave ~ OAaatto Iooeet ro aoC, Icosjoie 1 ~OSCO
AoacrtOO ''aatrt sje Iatet Ia. I eeolgaoat 4'Ja I ateaavier O al CEO E~(O OOT 'IVO tierl~
at ratio TO Iaasrett OOSS tCA Iat ISO OAOOSSOSS~A
5 CAArc OJAIN radar cttoc To TAAN ~i tooV IAITRITASJotted To rooer otoar~Ottrsj tottetoATICSIAa. TSOroat4 INATTNAcc SIC AIATc oor To TAI
I~Ilare ls ~Oat IO
~Iroroo Ae~ ~ 52~X
Ott™7I I . 'XIIIIIII)IIIOoocaa Area eoecrto
4 to etta&TOO OOA O M. OOPS ~s AOJaasf SA >co ae nm rlJoraee nor~oreoaar tlpav. TA RCAIJac AAc Actio. All otoroatvOaaoo ircaa a4vocNO aa SN Acc
OAOIKi IIIINJvTtooeII rto ~ 'OlT Ott la' ~ OvvA~ aetaedeC veCCC ~~ sacra Ironer N m A 4 IAtroo ohio eaAIA5t~a.
larlra codd O'OO aavsf OC ear@i'AJOCAreiTO IAO OOV,O, Ooaeaa Waaae J I
O. IOR l,'NIT I 'lr~~AIIOX'KK'O. C AAoa COCA AT CO~
IL Oil OIIRLJW Her. valets ea ONT I AIO Sttaatt laateALeta e O'Ar o
RM INOEXEO REV,
P ~@Pm Otg~,104628
i!iOO
f3.
TAdt k~~IterateOS.caei hearn a 2,OILS aF ~~-
~ ZFIEF D~wDC-8694!ogl)f43'CS
CJIS a! I%V
500ZOl /yp /J74 /P5INCIOC OOTSIO6
'ctctrr, ~evre v-56 ~s2 rcpt
TfItCooo 7 ITOPPAI
$&r~~'CIN IO='-
sr tt:nir P Mtl
) ~56-Z575% - I'g-1
g II ~i~77
Sbl
Ct r
OTC94IPLA'orif0 ~ skrssc lW~!! S6-608-81'6 'Y~o~~~ll
ls IIO ~ rr
I
2
919
rgsIA .6I toolV
etcpt~lit+576
tlolr CtSCO, @itic, I
IIII~ I~
ctrl v ~JT ISO
etcte'~~~ = ~ 56rcco
f- 56=- "'-
I tstc ~ PIC
l gl i=I
I ..=...'P1 .0 IIatt siI I
l Vclrr» TlrNs
PP Q75 AIICS CCOC $/198569~
gctDD ~ 79,I
~ r N
65
RVO6+4 I
VcvsTCOCE
IwhslIOIO II%
TANGLE
PPtet rfh ~ I Pt 06 iro
OROO CTICO
eftrc ss etnr9 IC NN
FT 6
t„e Psi NIT5IIOMO
CE K~g1
rt1 *st, hear.rp ct vtt 6$»-"gp—~ J
aaa>g m pc '855ce
I ~(~P699902 "
z N."~I6&fee-3e
I si II
T„v883SAsoor4 .cell ~ttotcco-SCJJI69 3
NO.CAN. Csrtr
C~clctc
i4$ I Tfrgt8t 'gjN~~9 ~ A I ~
Isl.III636~rrooePII~ I CONICI IICAT Ogote 2II
0 I~~N
J
/
IOTS t9 is' sr )
I.
rW CATI
Pgggg 'srre«stth ~
"I~\Istj
IIlI
I;lctr II
I
laOO OIOIlfssoTt tstt fArrtrANTC
I TrTST IS~I
8 g J'~ Ot
@AD Trt~t, 1st! A f
X ~06 te
Vjgt6,",.:p„BR:,.:-'.
pg ICATCCCOETI 09ry Otttct ~ rrt
T Tl Iir ClvoCTI .Atrc CSI
MATOSDOtaSCNr
26I
lIeaeo
ekeNgl—@Is
tcQO
56%572 k 1ctst agtt )OOPC
C
.'~t g. otr tp-4
6892C «II I Icclcctccc 898D ~
Et)tcl
lICEIEC pp5
K~~ kDER
Rr ~ tit P 5cs 5.30 rscfo
56-3chiE2 ~ -8 -Ec I 56 692-3'
IIeto CICIAIIC
If IsotraaOI IS
fa
g56-SO !~t faaa l~ss
A ~
rTIFF+.
5911-oT
QI55645< * t& .II'III~ I2IIIC
lee CCOt @ gegr 56 JY<7 678:fsa ~ .
201 r ~ II 'I
I IS~ Sl. St
Ipa
1st
i~ tL
~IJ
ECP QW'r I7 IS A
.CI Cto Vr»IAOIC0T ~ OA,
~ Ao rwftNrt ~ttsrrcNSA 'so' TATS~ are, rf WstN tiTNATrrfhtAWO.loororlrtIVNVON~N, Ntooft ~tfA orp
A N 'w trctcsr s st. Co I NApr A w r~ho itWOA.ONA. TOC-.W ~roTTIS
AOCC Arc rttTANJPcrs~a,. CA OphoATCAT~ TPJAss! s.>rtr ~-
C sttortoh ~WN NINOOtootnTA rVIONJN6
'CA( ~TONTAJCIP NO M H:rir IICP ~ 9~S 'r rf O 6 ti mr II.~IIN COTN TINITS ~ I1 EA1'JJ ~ ~ OIIIOO
+ ~ ~ ~)
OCCI4CTEETH~ ~ r
t.ft CIE IrJIP
JCr
CSCCN Pv~ rAsO51 ~
CCIJP, OerV Tirtcr Irrest S
crt DIPC <Pcs I070of SII75tat occccr REv ~
Tr-I~ II
r A
S9 tl6
~III-. CNAPCIC 10 Afire
crhp ~ -rrctp ocAIC TJPR ot P G gE ~ -a~ NE auWCa
sutrgg oa ].0 f628 I >IIODTRCTAIC'QttrfCEarlttre6OIIIAIN~IIT
~OAONC $'M
IIOOIEQ RET.
~ NC'. I4QMMl Cft I
I ~~rtrs ————————————————~-11421---- —h ~~~IOIT TTV SIAAM
(~~Is T Tl Qrs Tct I'JSItt 911 lrw+fcCtsc 0 I4 Irst I INQg ISl-IIQ-61K o~r .."., I I iN ~ ~
25I II I Cl f.+rtttr ~Q g NROCCA NIA IL
O .rmdA ~~ E' 2-I EE8
l ~Fr I (»
200 20:-
.ISSUE
ST@ '4" t
TpcosITAIIIIflfDIT~rSf RAY
DCV 4,4IA81-930 382
COSCPOlltll TR
aaaoOCC!Dctreafcsact
Ofatl!DDge'. aa aal rS!44 I
,h
.„ IC'IZRrIZRSIII6'Tocaa
-=. z: - ~ -=. 51.229.38P
I I
SI.5992-24n~
4'a
~
IooP satccs ass coo "14 <, I r
8729A'Sl
V!T ease
118'SJKeS OOJAE "I
~ c~ .a
~1,, c
ea '+AI-t'438.882 J
VhC
Ii 82.924.ttc SIP
COSI T. ITRCI
isaac; » SOHPSSg,
s OI-5280»I/CTT .rrFAIL"
(r»sar~
@TV'DttAsa
'
a
~ 1* eh~ats~SPIAf. la a.
D
Cc s. '+-vaf
4 Cata
Q 3C5Z 'j'o?C STISA
~ j,O61-9 5~ DA -ca. D~ cta
61 1661 '8
-»
aS vl IgrfSl41
» ~ » ul!Lc:
~SI 3896ll|l-
. RODuslrMG wIR SI'2IoQ82~ ~
CTC TA K 223'ltSDCSS ~ S
~ I rca J,f aaI HI l432
':h~r ha
6TZSASI 3253 PjgOC~
ODD~I
"68 '+ST PASS
g
Sl 32T'I
82-2665 82[
St tcO4OV
SIC I8Sl 3239'Itl&I~>
OsuO
g[ f, 'TIOA, STIOS RCSr
4»Carta' ~, IOOP4Tc,llOT LEG
e re k! ~cs. a.
RCTu Q. auTIL5TG TAaIIC
~iDICusoccacs
COMPONSIITCAC3. IITIC
SICISOZ.ZX.
82)'
OI -8669~3Z-
'liIRDemoonc'rs RascoalAI aaIAT
C ullsf!CCSS al,a
l44I4»IO
82808»face!»f
ol, Qz
1 - ~
'f a
=4~ .,
82344
'e ~ 4 ~~~ .
8'%$33 I/gSl lus 8
l I
CO+tOaaoaCC c!I eCCC f.C.
2
~ raa fea»V
— ' Rasl DuAIRSAT RCKO!aA„,
fSTCty PualP Sft-e OVOSCVSvn9.
llCY~" s" - Sl 233 SIOPSe a
P
I" ~%lou, 81449f%I
;.e 1»
pttoo O,'
g~»» SefeOttDO
XFSVL9lD4
Vc e
IbIDDO )~a( affeg
s
(hf » ah
2 I
Ve
!t 52 ST96.)a" fah 1 ~
IO RtAOIORCOOLANTLOOP IIIOT LZS
515eZSSg~;, . 8
—",.. LoCal
—.,-~ . " 3~4' — 'sl 3182.st4294»- ~
.SIS LIHfKST
1
a vase c-
e SAI!IPLZSI 93lt3 a-
'TV4TO 583%~<-96=gj @f2 ISS 282$ ;23
ILTalasa. a " 'OOLANT~ '+s'.- <~~c" sLOOP g
I 8 StiOS SISq
r e
T!::
r
l '»»I»ala,S%'= .SYSTEM cp'SOgIAIgZpICI
931 33La
~ s9 ~ I'2Olla
c
aa ' '
'ahto»a
ecg1»ccs aa» a» Lhh
c»» a, »Ka or ~ u»', e*
1 Ah 4 ae ~,"h 4 e Cela
flat » a
RE'P. RHR
~.c.O3.O981 A2OSO Q Z ~$ OF ~g SIICSTgg
E QQ oRavvlua No cRANOS
.1O<e28l 3
DuAL44ATaaafaa44ll O'I a
ac ~
OOICPONCNf SAN LS
12 127 IZ8
4' g "; 5~2usIP t< gteoSAI SltIA
RM INacXrO aaV.~=
'2IO . 2I 2 213 ZI4 2I5 2I <p 2IZ 2'Ia 2I8
/0<»ACR. RE<»ICIIRfP TO RC!»<OVE
EtlctchKtcLR cAts) Ko<
~CS
18
Qt 6 I PPL0«PLACI»IVC NT C U 6|'0
CO<CPMCCT COC<C.CICSIWA~Za Suan 4
RZSDRK MCAOfg f«fPI< <C ~
QI<
-"o I
ik
<QQ<<0D
RHR RHRI'E- PP 2.-SO<
C.a<A
f ICy .'8
QA
/
CO~ 4+0
0 ='C~ AlOO RACSEP FACE r LASlcjf - Pi)S»<P:tl<A.CCKC OUTI.ETPCPEO TO HEAT EXCHAIV<AER QOREoP p~l
A E~ PT. VEslT CR CLL<EblCH6 z...'
~
Q I ~
L PY OD All«I (<0'ACID MAi4)
Q; ..l'T.- FLLISHlhC"- CO>lg.-l lPED FFIOV HEAT EXCHAN6EP,
0 lL - p.j ecoL<H~g 'q.llcD IN0'.- HEAT Ej(clCAIIGF~bl - P.T.—COO IHO, Llauco-OllT 5<DR</l R"=CASA<:b
a.
0 I 3C'O~ ~ Fl4ii&E-C.a~a>~~ DRCeq
OYE. PEhlE.TUBATE TE.5,TRECK' REO.j ALL 5EA l<NEc Og >Ei2 PT A5lfl 3
2 i4IO P05T IVEL,D HEAT ~iE/CTMENT REQUIRED
toHOP AOTF lUSE IEi LCI4I TAPE, 6 EA COKK.
r
D
OSSCHAR,C,E
lE<
CA /CH <»»
bRAICl
QS,QCS:.
QA. NO%El 0
J»4»V
A�/4».4 VIP
TOPI C»»S L
REC<RC JLAI IODl OF I IOCUID FROl»C 5EAILIVlTH PUMPISCC< iZlt4C'C - fHRLI C CLED 4SAC< IO 0~EAL.
At/,~ ft,I 4<CA<A<,
IAI»C«t
«CAC TCfAC 40 404<44
APO f C<'Ve
I. 0.< CCI 'I-
Ct ECCSS C<C«C0»ltd, SAC <0<lDI»4< ~ I »CC CW 4 II I'40 0 Cti 't C Cs»4ft V '» ~ ~ <0</4\% ti 1,4 ~ C 04 ~ I ~ C» CV I
~ I I. 4<44»»CC /4 ~, ~ I 0C v»h«4 l<„~»0 V»CAVC«4 C . ~ 4 4 ~ ~ CAV40t ~ tt~ 'I» Cv isttvt 0' CCf»'I»,4»444'I h0» C40 It f ~ 4'I CDAf » ACV )I SC CA ~ 4
I» 04 th,f 4 ttl/l ~ I ~ 4 A i«4<I' ' 40 4 '» I ~ 'I, ~ Cwt t~ /44 I»~ I ~ tt'I ~ I Ai»44 4«l«4 ~ .044<«4
tCA04/ 44 04Ct »0 ASS 4 I
" ~, /4*l0 DC»4 «0C <<A l<'C&> I ~ 2.,"Il
l4Co.ll-64I
44«v
4/~
''+ ~
t\ l!'+
"/IP NO ~" "~
I» ~ C ~44»0 tlvv ~ » I VA»i
~i4~BS~MK~»~KG=1<»cADIA 040<vtt<CDIDIICc
SEAL PtPI NG4 ~ ~
'«0«C»v»C& 44 . ~
SA
.g,l.:—:.~4<.CG
ISCI/ JRff. O~f: RKR 5'YSI. l02OIO SPIC.'l.
REC. D~S, OCcuaan<e)[25]
RM msmeKvp g g p Co OAlwcN» No HlNSE
~HEET2)OF .EHEE 1 0 46 2 8 3~I Sh4
-2ZO
IZI(CS(aac«
~ INCSI
;0,II
la)SITTSCSII I 'I 74«SSACC il .A
I ICOSI
'li5IIIS(05 C)a(f
SIC'()FTAIIIMC((fC()IIT)INMCIITWCIOCasl.'9A.
ICal
~ /W ..")AA
I
m(}a I
I:',Ic-5~3
TK A~I.CI
(.eire~ c~»CE T!)S(3Iffra Lf)a I
'1 ITA)srr« araki A 1
IrC«r, KV
'a."
'I
I nieg ICj
5»I $ 11
T4ac33M++~ ~Q;.6 35! Ia ~ ~ E T.
g g a > >><< c)< 1~$
c I «~sg
1 TT lr a4 1 ~*OTTO Sl ~
. ~
.,cj
3
)V1
'I I
SIT IA» . SI~
.IN.»a.'Isle,
S» C.«A
(Qsa
»)ITT
ASS TAA
« i.SS
6.17&~»;~I
2ZS
WET ir('»IC. EC(1$?~ IC.QEA»t TA((va 5.1
,.„;,; I=C- gj~ Jaasf Cgo<a/w'V1
'CtE
9$$IA .g5 1335~V&
%(ta4~'c:t)57~TPA «6
~AO,A )
TiL$ I~
E(lc$) $$$(5 4 W
$1, z~-+'STC
t6,17 '~T)«13'
TNIC95 (9Ta«TA 9'iil
C.
A««ClassS«K (TC«$ -
Ls'9)rI.CY
17j'CI 6-
7 C,
$331 C
I'4 KSV(
,9 $ 59 5'~(c SS SA
~VV.~ ECf «1 IQ Voce v»ca«AT pf ~
X Er . IJÃ$ ('.
IICCIOQALEO I E
1 I C ' ~
$ IMOVAIA~usia g-I 5($ (3( 655)ATA
ILLS(ousL IIT
PVM&$1$«'13CII Qi
~ ar»S Af/cs«cs 5 Crcsa
L«tsr Cmm,~
~EIrI«. «cs 3f'c ~ACf c(5f( TS««
3 CONf(rS. TAI(r(
~ S
'TT«I IAS 'CO
/-V 5«J SS-f L»-SEC
ITEPiiZIAATC5t
((')~os.
I ))SOS>) )"f)b
1 ITIr'A I Svvcc a» $ 3$ I r-
"L~>-'TKC
MTSS$9'«$ +
(F9($
«'«f ural
ICXCtATC«.
I
$@ $AM)L$ Con,$ 5 ~o 1S.'-ITJ IQT
~+SS CA, LCcat fl TA 'I'I
II I I 3 I
! . ~~.~6 .I43a«ia066 Fh(LEO FI)&l SACTECTia)'>. A6$ 51)BL'I
IIIJTC(OE 6ALlPUH& FOAM
IIcsaslssa
Via S(AIIScvca
QT .ETAILS T$)53(a'3
'C$5cs«rra El, ar I
9ITA (6ra H(71 E «
YE!IT IIEA~cR
g -" C3 I~c. i~5, 0
x%4(llr»
Ca
C«l sssaacco
,~EI.E
f~ Iac
SS 11 ~ ~S Sc«IC SCJTO S)df)c(rs1«9 cau)s )««SI
NOTS-I AAITIE S Sa NI ~OO A T=raa'I S'. AIIEO AS AAOIE/a.
«.$1'dr TI)5(IJG AEIA(TTEO TO VA4IS)SSIJCC P(9E AI YAL (TE
S PEL«3Y G($(L FCTT Ni@ r«C)af II« 5'(I TS(ITS Tra PRA7V(()TA s(4ca «Ec.)/(fJ)Ax/Cr
CAWINSX)C Cv»NT/JW51JT A(VD 0) «EC. DELAY TD E)ETEC TOR ~~4. ALL ( C(r( IT3)a)8&5 Iu 'Ia(E $5. AfcE 5( OTV)J WIT(r()LIT ~ H 5 PRE. IX
PASE 6'&. )CREPE)I Ta) QW ST& IJS REPO(EI ~
&ALLTU81(a5 IS. 5)'(5 17.0. EI(CEPT A5 SETA'TIDED
g,l(a(LET Ta) LAECC 1 5'T E(ETTA)+ ~>~.a~a) RIII HIIC~AH
JSE I«)IIITE'T'U'B«EP=C. «E+~E "LVE CIEH L$'lE 19'NE ~g- I nI ~
RGF. PLT&: $$63 A (4~$>",=
Q~s SOTT«
Caa"CTOCs«vlac»A Ics,sl
f
SIEI@I
SNTA I+s Er«a)1 R
JISV 7(TLIHQ Ster LO$() I
Cp 013AWlll6 ILGWU C
nm ~ 104628 .l3.RM lNOhX~L)~"- g
23O 23 I 232 239 235 23& 237 238 239
SPDM sllroII(OD((5
33i97S+
~ ad
St-ZdoZ-Z «Z
g La. I-.*rQtt gc, ~ a
V,
OL tot< *
r
I ~
OCCCIO>C.P-'ct«5««««
~rtlr/5«>i- J~I'f
>c>I/O Il+50NCg 5
14I>>>>
53 ZTWD
tac 1« tl~ Sk/t//+i
szatls-~/+8~5(«ltIC >»0
't
89994L 1 ~ 1'ILrc
>I/5'JI « .y.,CIC IL
~=~>, « I
«IS»
JJ
IIIIC-a
$3 ?338 f J»
I Ir .aa'
.9~,1. ~.->is!-(tcs.3CDIP
„-;./to/CAr/0
5(at st.gg CCC>$
mlD~< ~TBx((IAN~ 2 I
f3Pl
rc >hllwc (IC00(o. od
tat a gs
8tt9>4
'/ll/Wl/J' « -'
curr!y ...g>9I,
t
5
Ottg 4
I
89911
03 23(1C
>'ss.tord
t>K>i..'544 Q!l>+I
J>OCCSOIC~~ i'W I«»
tr r" j38>tsA 89955 .+«I- I
XI'
3 899I>3 I >ra
S(-(CC 3-A(IV(IIOC /I/tt,
. 5/0>>AC( 7'll.
'aibaCI OJI CI Lt L«air», » $a.liar CI' il: ra'+>C a 4 J», I'T>r>aaC 5'r I»J ~ ~ >II', C
I'at!>i II'i ta>a>tttt'4'cia'I >I 'A..5 5 .N
@VI>l 5> «>I ~ > Iaaia4 I « te- ~ -J.,al,u aq
Ida I'4 I>L.aa It«71» «Cu 4 4~ 3 'c.
,,"„",~',.~5jl5,25,24 .
030CS 8I ADDED Q 2Clt6$ , OP; ~~fgJ 4.',".
~v>I>'»a ~ > '>14 u»l, I I . a,
Ris'(CW0:.CO>IV,8<II/IY 5YSTCH I
l030I+ Sa>T.'8
r 'ac'ilJC/53
I
~> ~~ II 1
>ILN> Il»dr
8tt(5(.(509 3
TC ettd
N(SIDI/CC I!SOT(d(HAOC(!I 8 g
5/4(040r
'4 - - /Ogto~», 93O
t'r>talc(
SMC 8
5( ?Cr 3
aa89958
SI49Ct >NIDP
90/(8 Otttg~ 8$ttg899505303)S-CiL'
tl/08 5( sl/5'SZ SCSI'g l«!g LI8
TC SAICl 0,90OCP
53(/9 3
w
a
aj
7ICS IO
».J««J * kt Iwf'«(zap(3.P<™ f~
Ct (PSI
DCCC30/C.I»
>>C lf>IIII > >ISSJ
90090» aa «!
MS?Odsg P ~
$3 'I$3 (3( lo
I, s(>NO %4/0>
0>
' 90IS8la ts( 89ttts-SZ 5050~
Stamp(ay<i''CI~~~,»3~ ILj, |UN Ji a«J ~
I g tt'CI/O
IA//I(
rc'
«a,l I!OvtOIOO
/IIII>CONT
WC!00
tc '.%
oco!c/uc I/O CCC>ICC
10'3628! 3P.G 8, E CO.
Stt(sl 23 f>t
«v >CC>>o W
~ ~ ~
l '"""'.'' ' ~
I,r./I 'Ir
tco<A~ l ''"'--':: = -
x'~+5m/P(
SS-3(38M s - ct.to
~«V rr ae
I.~vv
'lT' ~ ~ I-
~ aa
rara
243
(a-Q sc
t ~ e t
2+6 246 zz7~ 'I~ '» I I
ta IS<sac ea ~ I Pit
~PI c'c Iaua s
lv ah< Sr la<
rr n»1 J.<lv'II«ae
249
VIII<I vao (4rls
~ese,ea«i ~Ms eee»44. ~ V
a» Jasor-Ct
lac
~ ~ ~ 4
*<SOgliee~ 1
;4)~ ~
: 4<
I JI''OCCok.r.$444 Ta«4
4 IPtje; sr sral ~~Ofl
erIS
arr, »Tpl~»4
~ i»Or I~ 4
oa 4)ID I» alr sos.nsrae ~ \11 $ 4<10 ~ - CH
I
aetna< ~e ~.44'3oases era
» ttoc eels» I)
~ a«JC lr'I~ I»a <JCSOfi acr<» 4~n LJ
4<os+)+ts e»MO. ISecva 4
'rrecra e«uo<V $~4 eave) a )COP<I <etta«rag
4 I eepaaa» <<ease<44
~c«a IO~f~ $ 15
S.let Di <44D
~ iI<10
aPJ I~15> ~rel
«<asap 4«a TSCO ~ RI toolxaAR case«e i
~Cf t is 'aa)0 4 ~ CaVV ja)Pss r«ca»nra)ID
~ ', Pn4 5
)acr/<VIe, is»=- JIIC~.D il
eea, «Qgq asI
OIOIsa
ra'$5)S
Ta~) r«~aa
'ar4 IJP'Ia
lsat (O
'~sa ~ I
sa ea
resrs ~
$ J ----.;«cgII
41st,I a<CD
$$$)ttOPI
4«RTCress
Je
J ISO
J'capt «IT~ s
~ JIS'
OTTOS I«1 I
I IP
)»]0 ~ <N t 11)I g 4'4$
te Ole~ c«CD/
~ a'IOID'pce» IvLDIT')cp
I1
~ I'I-CTIPIIJ<
+$ «O'le
1
II
Iv I
~I ».<$ae I<r ca<MT
~ sslr 's t'44''9D«»$
D<aI irvrDvopII" I~~PJD
Dc 0«IReals ttIvslI
I eeeos~I
~4»a~ v<Ve
PR~ 4
~tres)no
el"CI<eaana I IRZ
~ r ~
a11144« Iclasr,ao csasa
~CICS
s. Irt)sc art Iv«)cat os plat 1 ssDI recco icsrsc fcssscattaera arrra~r
t. Irs)rc r«.R o)es fo Doss IRL olt oaa.~t, Icos<assr pest 0 Ittr lor» fata 4sssaarl JIJ)$$
~ Igcalt ~ IrtT Rasa less<ac sales ItlcL.o. Iaa Cat stoa yR44$ aa Dtm sst Roc« os Dost IRrss
~IOOC Rf,(IJ STOTIS OCP
o. »a Peal»I oe s«s csstr Doaa R pss cuss 5 oatss cores.T. Toro<or seas«co sa IIJRR$ as sroa plot o)«ss arena
~Iaweec os as'leon. Sssa«so oss R crsceRI Ccrc% Ilkfl.~ssrr»p. rior Deca Parce olla ct ncspos<ps cooatrlcvbX3b
4I ~e, u1g ID>
a arD -~), I '+Bf!Jq
Pat%ICS t <4
rl '4crttI
I'4 ««eav «Ve J
4 tet Sn
~ S
~ a <CO
+a/'s. L
<C
era~«0 ~ OM
9
'JOve l«4 C ~
44~ ela
~ea e\ Ia aaCcrassfh e*
1 nsra5
<wSe e<IO
~ia 4I vv ~ . ucslt a<Lac»)4 I» Dspglrtscs ore<0<loca aaooc 0/oa«eo r'eos
ar'l e«er 4<OIO et Oa ase aar T «I CCT<rlfaeSVCOI
Ie«< I>IVI gl4<«ala ~(S'<»elo
cv)isvvwn~g g'ts » aero ««sae 4'M
',wasC <DL.;- wj @5$ $
,. )<a<sf<i»e«I ~ lt Je 'e a
II- e L
1ufoi -arr 1I
1)o"Sg ew sls I
II
VO $4)«Do 4Je
RFOC IIOCD. 5PjÃF'MIaDII'oca)D5sraT. $ 05$ $$5 crDIL7'3$rr. D.
mr. $$$$5'.at ~ (3) [44,
~le ~ I $< IIMPgPPgP» S~~
2 5l '52
35 (Qielte 'K; Jl
ee
~ K9™H<Cl.g
~ee rt.~a&
eQl I 9IQI
CD wATE pUpaps
DC tit682I3-(I)
3$ 3S ~ ~ III~WWES~WWWWWWW N ~WWW
(Implyle'-
1
+P II " w g g+T,'e'«I ...) I Y -g g~t1(-i w
q)g I lettyg
7-"...;:P=.;" .
cse Dsa 3Tsn i
VITALSERVICE.Kli44AII HEADER'A
r I"r 4~5p~I3I'<ee
5 'ee,~ M Y/,
FCVH30 ~ v ~
~ AP IsP
Selm:g' .:
~wiOOTi)I1 / r.~ f /
I I rV
4y f'D 3 99I,'a) 9
,e ~<red-AgT AzB~AL'-. ~H
C~HI ~A' .IS)[- TAIJKS D
DC-Bob 'I3-[lf Mp[3)
I Ir ISI 3KI
0DC 66383 -
Pg
sts y Ile
I
K IOeael > ze',
~ ~ ~ VITII SERVICE.. 7-GJITie
(-'7~2
TURBINE RDG.t
C 0 IfC T Lsak
(.II0
MISCSERVICEHEADERrce
<.v<+p-: ~.
m 'AI Kli AUXILIARY BLDG.TVASIss. 4 CAPX Ol SSI,
SIALL
volT To ATII
K~lm .e
I+Id, IQ Q I3s
K 2 I
CF
e amtehg
II lI I
r:QB~e
K .—.hrla . AVX. Dgl ISeleetI V, 0 I
>+ Tp Iap II
a k,1 I I'='.
I-I l g
'SMIIa wTR.
I I Ilacs vp
I I r.
I I ml'. ILaaamCaNISSWaeaaSa I I QIID3RI
I CX~V
I ~g KV-lec, I.4 xl" L.
ISIDC-663ZZS-3
UIIIT I Osle
T.~gg] tIIIIITr IIIe,TK. TAO ale. IS I.I IJTI
D II
I'l2 4 3
33 I/ ~ +apIATIoel S I oGLL
.~capet lares 'I E III A
s ~
m $ s Toit I A QTI RETURIII
t't:""te" Irett It'I.„I)RETemt'fa I8 I II e RETIIIDI
teer.ttet ec eeet. teeetl ettfe tteee
r e
B
' ~ Q s+ ~ 4g7+~r
CSI09.6I /LPDEP CI 5 CH&$ DF REV.
P.6.8.F CQ~KTIIO. ~ OS SIICtfS
PAJQNlee4 Issl CIVVI4C
104628et
260 26! 26 264 26 26 26
i&03-2O VITAL, SERVICE SUP PLY HEAP ER 4
lri2277.20 MISC SERVICE SUPPLY HEAP ER "6I www MMMMwsswwwarwMMM~M~atMSRM
(422 p(i!)
VITAI. SERVICE SUPPLY HEAPER 6&~Mwwatr aatatwwataratMarraarskaratwwMraatMM~arMMMatra8&( If
~ l7 74Si -2ISI-2 39,lpga
39
270- E
2.70-
'KmyH(
2I37~
'.0
err. I
(@Ttt
'k:litic'Kie5It .~01:+
(
k-OeT
8JBAG !883~~
4K
cr
LUBE OllQOOLER (fYQ„
D BS tI.C( K
f'~
Z~ I~itV Id 'l
.,Ccv/;
3iSTUF FINS
~It/ ti
CCW.: 2'; PP.
2~,(
CCW
. PP' 28
~$ )(
STUFFING BOX S T UFFING:„BOX
&1884
K2398)I
5'I
k;Test)
9
8~8Se:
NIBS'.Nesa~l+
;R~2Se(FI I Vl 95/
~'TO RETURII
HEIIIDER '8'I,(IL-I 81- ih Td RETuRN
"r't~ '" <isa-a~II(f-tf:
~270 <
PX „T I BE I G".ATE-,. "v-rtt I! " of I IIEAT EXCIIA'4C(ER ~3A-cf2'CAT- F'~tf'IftK, .'9 I, i('M rr C v+( ('fitly rfit(tt'<ALrg h:tD FRt I I'- - „,j TACF RLvLAI,F Vrlj ~f'IN) FLrIIIGEAF t K,R T-"":
9 ' 'I IS IJC((-curtcs (( t. 8:tl,' ALirr. ti >t(IMAH 3 AT Cf(E;i( '.
~ .„'" (A*.,4 'Iffy' 4 ~ O'-THEIF 104628 . -;3rf. ()C:IT) TLS. F. u ~ -. IrChtCVE VAIaE'a:OII wc nofor.";~. s~s. ~ Is citss r ~re-~
K-213 ~ 2 ~"25 -C t ., 5
k-82-'20 RET URN HEADE'Rt3'mmatatcammatmatwarss~raarattaaaatarraararmmmaratarwatarassaararwmmaaar arar~
259-Ak.~~8~ RETORN IIEAPER
C'5t
A-k-8!-2o RETURN HEADER A'
tt ((- S+34
C MP HEIST C L HG WATER PUMPS COOLING k, 0s.c9.9! AIIEP a 8 CHGs oF EEY.9
a.v. g 4P.1 DWG 102014 SIIT-5A (CW SYST
5~ET Ho tt6 oF sMEErsQIIA!IrlHGtIU~IICSt
27I 274 278
269-E103 VITAL SERVICE SUPPLY HEADER A
269-EMISC. SERVICE SUPPLY HEADER C
269- P104 VITAL SERVICE SUPPLY HEADER
(j~4~i) I
fI
!1 I94424
/~3 2
~ tt +t. oFO).- oc"-1Ssl)-3
o s ~
S ss O'
El i s 5370;$g m42T )~ESZA t Rs'Cy.3FE4( .EI
otss.r
1 ~
V
P 9oc'li 1 9 ~
lo
33 5 ATOP' 't tTQ ~ ~5
l -~ ~ IBI I7
4 1
l6l E
pg-4ae $ V."'sttls1
I O. CUt~Eiooo 2
~VE.C
13127 1
031L'sOSt/0
Io
'11
I69-45ETklPVCAL Cjtikts.
l~ 2, It FIECKAF54
j43B AIDS)
RETURN HEADE
169-C
!~~oSysTcoo 1 s~M zL~1LSSIEL SFAiSC,WS
IIATTE I sszss z.tA tt4'~aL""
ISO-<8, Pte ~-Tyk «Pl.'C 3 ~t
TykCONTAINMENT WALL
STS 333 1 s~«C.
3 I
TTR7 I 1 1
10
5
r octS SAT
C .~~/ZCEO'ff 3
~KT "
Cl
So1
<lla.L~RN ss+~3C2A.~A825,13F f,
~ss'3'is
"CG31-. 7 35 ~ ysksI
SO I ~I Al 'o.s
yilCG I 1 TATS I 19'y~ I I l50TO .. s.col/ —:td~I I ~Otft '.X.
31 /s
18 . 1S 14~ESOO ~
3l9 r 9?t 3 1
37SA.B =5 5 7~ 3 SA~BEg. sto '$~75 ~ B 9<
'$17 g, '+b. $ ,„~B~l'S
I io 1
269-B
7 4~EE -35
5~33 ESWTIL CLR.
SF \
RESIDUAL H.X. Z.l.r RES. HEAT REM
RETURN HEADER 'C
RETUQIt HEADER 'A"
C NTQIFUGAL CHARGINGPUMP t t PACKAGE CLRSs
DC S~~''0. 4T. 46 «9 CO
TCV.27
FETY INACTION PP t-iCOOCE31
CC - 663616- 9, 36
81
280-B
~zoo~
REACTOR CONTAIMQENT FAth COOLERS2SIP+ DC -6630'?9- It 2 CLCE. C ) S
O3509,21 ADDED a 3 CH&$ OF REV, 94'IC4 VL5.- c w seer. Iotot4 aav.9 'SENT. 6
ti0Z LC33SE ~ I
Z OP
a'5~ 5 Ot ~
rsQ 55
'3
HEADER 8 COMPONENTS5,. 3 s." Lors '3 3 5" T.sr soo 5 -",-E.
StostTM. OF 3HCCT3
BLEESSk StIAtls4
1046Z8 . 3
280 28I 282 283 284 285 287 288 289
K t o~Sto VITAL SERVICE SUPPLY HEADER 'A
279-E
aa ma~Qi ttmscxscct~aamaactcmamMISC. SERVICE SUPPIY HEADER
290-E
2 +23
RV-302
*:tt)V
K 1
K
cp;cp)g FAu3< tiKA32ITt
COI4NOIIOr) I +23
II
It)t«303 rI
.zxzm tt tKtttzrt i
5'i)2AL~V+i PA r
C«to -3
khLLYI'4 ttt5T S.f~t3~I
RV ISI
c'FLUID DRIVEO) L COOLEIL
~s*.s pe
VD
(t)43
r LUBCO)lCOOl4R.
44
I
ZTST 1
~ = ... I1W 2 B
'R23232O)~mme mmes Wmmm~mmmmmmmT9-A 8
RETURN HEADER 'C 34
~ «/t
r «t
RETURN
WASTE GAS COMPRESSORS 2 ~l P-iS EAL Wh'TE R CQOLE RS
«
HEADER A
CENTRAL SA)APL~PANEL Z I
COOL E RS
RECIPROCATING CHARSIN623P PU~P Z;3. COOItRS
~oyg),uegD„CI 3 o)IO3 oe ~ ehloR3). Oth6.) CA'5YST. IO1t))4 RSV. 9 M).
HEADER,'C" COMPONQNT$ P.G.B.E.CQ5HKKTrah 78 OF
OCAtht~ NVll3C)I
10462.8
3HC333c)tA))ciE
3.
'290 29l 292 293 294 295 296 297 29S 29g
OitfSIOC CCSIITJlieee«lefftt«IOC COieT JifeeetteT
Sf le SSEL.
frtelA,
~t'LJ
I««CT'l+
~ 'I
,l fff«wj
,~C9 ~TP'wpL.
I~
'I Vgtt
MIr trre~ ~ '~:"~ ~
% SI
~~R2fc~~II
~I
~ L
I
Aa
AKcs,
I '~ e
~ 4 r
, ~
II'
I J V Pk 'fILI~ mw~m~p~ys~mgmw& mmmmmmmmmm~mgmm~~
269-e ' V
f«T S«O T4 Ceoee5 IO tL«P~e «IIII 5«teeti««LA
~ ~ REACTOR COOl ANT ~ g fell$5
V
~~~~(P~~I~sm«m~~~~ ~~~ ~~~~~ RS'~.~.R
'r &"Y'" """
OSIITA««I«IIT ooLL
~ I I'«fieee
II V. «It so
nO fL~ rI I
'e ~ Iie e
we
SVPPQRT, COOLERS
30 o-c
)-'IJ
Jr t
'~ /
e l ~ ~
f
)PI I-,«:e e
I ~ ~~ ~ r IILL~e<e
I«e Lteeeefe«tlf.I ele St e«ISC TLVLO ~ COO CIIcpeee I mef fs L oetLII
fo ic ceee'v ae I.it'f~Ct ref 5««et elf; ft
II
tertoe
29)-lt
( lt)
re
289-AIRRTVfftf ICEAOER Ct
RRTVICIC lCAOKR X
HEADER"G" COliflPOHENTSI
~too -tie29437~%l
9«l O~OC$ lllf cg Q CyC&+OF Rpf. /Br,lO
I REF. llwCs.l CW Sf'S7: l02Dft SHI.L1
P G8C < CO~f~ $ 04)$ 8
35 MIM NEG J ~ ~ ~ CL««IIULIIIJIieLI 9
3OO 30I 302 303 304 - 305 3OS 3OT 308 3O9
VITAL SERVICE HEADER A
298-E 3IO-E
MISC. SERVICE HEADER C -227VIIlj 'L LINI7
'J(J'$g;10. 0 ?0 RO T ~~.4~»-, ~
'«~L< 07( IO ( S0 IZ~~(o lJIII-. SWW%t~~i'~~',(o(e" .. v OO gee, (
—„,,~ ' -'-e-(oooo ~~v
I=I-
IK3460 N.lI ~~ I
~((em~oooil ~oP(o)s.M I S I
I I O(ST(LLATgII III
I 42
33 SS
«.i'(S 4((((IJ
V~ V
0il I I(0
q:i'ICO 0.
~vC0 I 1
~C.p;:~~ Hl
O4 C (» A <w
LIOW'((OL
~( )M~V L ~II
PIO I I»IVIVI> .Io ".I (0 I ~ 'SC ~~ Io ((lJJ
<A~I(~Ov ( g ~3'l~
IO,I I> I 42
v"CC-E )~ 2 I
Vt I ~
"6»( M.MS VC~1~~~ I (:-~v
K Ii/4~,''e, fCV ~v.c».e<2 v
307IIO'IjI
f32 50I1
l«,Ilute
o.: I
l f S4.'Pa I i 4ZV~%RA~
'.C„:Sore,ae I ... '2I''="i'm'e~-
30 L( 28%0~ So AooTRETURII HEADER—-' ————7.%-r—-"-' "
298 -ARETURN HEADER 'A'&Al-'2O'.
!IOT Lto'OOP ((A
v> OII
1 -,+-Pgc~0IZaLI0, I4 X.
2SS535! .C f51 i~in
40f@Tilted
iSSSgh
~sutuxmH oui
PV-II(6
FVTQPC
v~lC I+S
8I 0-A
80RIG AGIO EVAPORATORPACI(,'A6K COOLERS
7vv(Q g vv
vVL~, T I+>'I~HI.(USE
~ I. v(g x»(C 0 e CCL» 0I( ~ 5I0( - vA > (ive . ('40UE '(O w(0(( ((Au*A )< I(VKL ~~(~> ~
AU~STEAh~LRAIII I I0ASTE COIICENTRATOAI R((el(ca veer oooo.
Ioooo@Go coo(~ERs
DC MSZ(3 (.v - e(o%7~„44STi"I Hr"." W
. HEADE R C" COMPONENTS .6.8,ECO,SHEETW30 a: . S~ S
CIIAII0E
10 I(628 1S
iI
2
IISSS SQ4PLE SKAT EXCHAIGER~ 0?C~%852A00ED o( & CHES oF ILSIÃTO
k, REF Dwa IO2 14 5(IT-B CW 5V~ II«B
3IO 3I2 3I3 3I5 3I& 3IS 3I 9
K IOS VITAL SERVICE SLIPPLY HEADER "a'ZZO- E
0 I- E
MISC SERVICE SIIPPLY HEADER g l44
IL'I ~xmas FjIl
ruor V9 g a~
%Iles . I ~KI ~~I
I0
K'I44 4V BV.
O'I
I30 4V
3
Kr ~
C VC'5
'gz=--c -.
i02 ALrrs
SC
E ~IX) 04IS:.I,(r9
4,4A!219 K le 5
P
RO ~
209 I \ ~29V
C
RV.I89V.I30
/N5$
I BLWDHWTKq19-D
Rc. 27COI4PENSER.(<op. ILP,-27) W
IIII
ROBIO
4 t +>A)J
529 l
~ 5 D "I
V
KI53 I2 '. Ix~34 2 IB
'TCy+
<J'N5iD'E CDNTAII4lrIENT,
—EAZZ2i+>'rev sw
V<5
XI45 4
~ .SV—"2'r~
D
t
C
TC
rf4) (rl)'I
5RV-SZ
IL2BI30'I- A
I 0
SEAL WATER HEATEXCHANGER
02>w ~ p
LETOOWII HEATEXCHANGER
RETURN HEADER C I ~P wQRETURN HEADER 'A
STEAM GENERATOR BLOWDOWNSAMPLE COOI.ERSFOR RADIATOM MONITORS
~320-*~lemma~~SPENT FUEL PIT EXCESS LETDOrIN HEATHEAT EXCHANGER EXCHANGER Rff. Oartlrrrr4
~sf t4ga45 rar ~ rg SSlr.+/S< 'I03.09.EI AbbED Ct..g&S'C'res 0 aeV. SLW
5rrsf1 H0 QI of srlEET5
HEADER C COMPONENTS
CQg
P.G.B.E'CO. OrIAW~C rrrrHBCK cllAIIGf
104628
820 2I 32$ 324 ~ 325I 32'2l 328
5I -6VITAL IIRVtIE IttPPLY ttata A'ctaa 20~~~am~~~~~~~~~~~~
k-8~2
K 922+2
lP-> -I4 I
.III
K+q@SO
IIX=12~t12gIIIII'~%2
4I + pcct-LOS>,smPLIlro
LT~O P<
SRIP
2CO.lyes /
'%I~I I
2 2A 2-28
CI'~k
K- P f215+5-
. I)( ps( j~.
»k(9.49
~s- "~~a2f
L,.O. C,nOI~R-11
—-ta='I
'I
II
Iffy
3I59+Q&
IK2-SIMBA
Q6
I II
I
OoTSIDE I12
CONTAOIIISE
I 2~ ~ I44
Q~gtSQ2
Fv 4'al 2'
~vs
SVS
+-O 4.'S~AR osiCO tRS g.g
SvSSaw
II2
CSNTRI fuOALCSIAQOINO
'tS 2.-1A PuuP <.I2-115 ) Iles(AOc 'RV 4
0 ~
@29~i'I
>U'RP,O- ITAV. »~r... „,3&5
29
I(siTC I
rr»-:eA~e~~ =I~12 JO
Ql)y a
2 I '~'~ c~O
'~as21 ~l2 , DI
~42~1
ONTAINLItaNfiWAI g
IAOTIa
h: ~, ~II
~ ' ai
I SIPEI CONTAINPENT I
CO~I
«V''ert3.2 IcOggOI SA).,PI 2
r .4'-I 2-4 l2 3 'lri
Isa
315A-ps 52
3$ .-A
KISS~-g)
RETURN HEADER A
C E E
CENTRIFUGALCHARGING PP. 2 I.
gl 2O'
II
IIR'LI20 ~B
"I I~~l»illI
TTP I~so ~I
Kl 3 ~~IR~gl2 Q
~S4, IA~S
8 Irahll
I Fcysu II ~~(6 - 2+~, I
I
TCV-2E
III
CIv UIIIrl orrtpl
RES IQIIAL HEAT RHR PP. 2-I I~ECTION ~ REACTOR CONTAIIIQENT FAN COOLERS ~EI(CHANGER, SEAL WTR. CLR PutIP 2.Z. FAN COILS
K - K~~17- I QP 2 E3217 9 IG QT'-rIE32(rr 2)I >Q IIh I OS N-8I 8+Gb~> yt@ w KIO< X.REF DWG 102014 9IT-IO CSIIIR'll T, I 04 Rr»ai
IIV ra
I.2
~ tts.'orr *TApas voi. F„err,i.ol ~TI oil I~n' c~ HEADER A" COMPONENTSr opt 2 *vi E I 0' f Q»irirpl AR I:IF pi'» 'OQtS~CQ la" si »tsfi Fs l Tvt»»r 5EI'lcrE, 0 3 I'II2 $f ~IQQ its
, G.LFcSIIESTs(O 32. QF SHEETS
IDEAL»IIlara IcruecFI CIIANCS
104628
330 392 397 398
P I ~
r h r
O<C --.I
"EOIIOEHSATESTORAGE TIC
- /a-I]
~ tvlCC
rI
SdZ-<$5/()
~)T ~l';
Tr
r„
I
A',0 '2~AC r IC. rf,
,='v»"Irh-Clt I)I <r ~ ~ f<,
1
3'3 I
I
)FEE Ivr< ~ Eh IrrrccEA
qI >the I gI
I' fIO rr'I "
r l~<el I.IY II
On~i8 5AHPLE
D <t ~ 5 +
1IP OLt IE
h
K-5&7.E
AUX FW'PP- r8EIIC8' = -"r 2
33I
TO PIANT TARO ORAlllNORHAI. OPERATIOII
AUX <L
f> C+L)=
~ . h TIlt
II C
T..I, lgSZ
Elr 'I< «Afg rfgn
A'.C -'Ali «Lr
EF4 L.LKS
Rt'/IP.
Ii . w)g vohO M
Zg s' dZ3.
) "ID*c
HllLIIEh 2;-A 'Io"-.= „'C.-P CrEC "')28 DR * r ''~
fvP~ I s t~ «)Alt I «" DC.
r LT''Orl Oc) 19SP,IIDOEO.EA. gc 14IlGiT OF REVS
I ~Q, ~
I
I'< I
uAlnll Xv - y '4
S7R lfAKIv 2126 2 ow
VfP'«
v I E- ~ --.= I
t
oI
h -..v O.v P.6.8 E-,:.> M;M leg. $
5IIEET i+L 33 ~ OP
X00628
5HEET5
CHAISE
SP'c .>- 183S PBIIT fVCL.PIT4F5
34
lltSLCS
ElZ't
ZP .4. Ic ~ CCS s >KESTR'TeSLIRGC TIE;".I !W r IlhItthaEE IIP ISA>IS!ER ttltTS
~MA.~~Clraa A '36:0253/
EI5'25 C>C5-
SLIRIAL.TjCARAXEhLP
S2;2I 2~$4 2SS-BtrCNC~] IRhsrBS
T2 alLT&.~f611
~~asar '5 DNI>cQ ~t~~r IOa,l;i,i,-l
Ca OCSS
CCZSG
GaeaC>4I
a.~~c rc4+4-COCA
IaIO>I I TOP TAJI>fPIIV.PS OISCII,
~~6'9 8 )8/c
Ca~~~ >:TRhtt SF Eft,Pl?
Pftt ttaRT 'a>ATEP,
IIP P'tf'5=r ~ 643Ceag5) t'ai'3>t>C> 663CLZ-pZg~, ~~
(Pff y2 ))~ Itr„
IIISCitt
To SPEIIT44, oEccDm HI
RE FUEL>IAs I'Lt+r< APSh> 'H
SE Ie2ffi I 0,
TG /~ISSTIC CR/Ptrrnr GC Vt -5
f 4I~Ogy 5 Eft'~AEi>AkzJMUIa 6J V.C265
s>~~K>si 5 5~41M.8OIOG
ACID TE>rasrc~
C B.EM
IE thzs 388%8 ~ ~ ftg rClal
cIAH 4.83I YORAZIR" T ~t 62>46 531
C .O As jC&266ODC8~
ZNOYII O~-Oal,2 SA>sR
'«+CSIA PI ~ . LD4T IOHCY
hcoaitCNE ~ 3 5 n
A»'-, )
A>I 2265S ~8
~ YG5- ELB4ER8 CIIEALChcuXI>I6
TA>IK.~~8 ~'48/
R
grEg. Ire->,HTROOP 85~TTED4
cTI E
I3 TD
~S2!35'46%4
CI5cMAC Ds''8 '6511
Ei,i I IBG5L
IEO t-t) (V.O-SA]QQ jrt44'/c ($0~~
OO 5>
r< CI)/CP>a&etta ~ GOER
t6< s3 To FLT. Q~reIcaacaPJ>it ACA>tat.
ZIIT3~I-5 't'
OC,>As> I0H D'A>D
6A. I'4
6rOaaIIcme5
~2fif
Mte/CE DI. ILPC% 5MAS>4TENAa>rrr
521IGOZr'444 05 5555$
SA>IIICO>ISA
y I<"0tss T> >I>lar I
-8K Srle '~O 0265
E) PtAVP/tltiac STCR. 'TIC
IQ 2OO,OOr a A'..554 44
C,
-D ISTE
67
',>HHST, > >rc 5>t
Ctr I c 250
f643 4 444>> 4fE ltrc~&
52 ff64 rh>551ON OIIOa>tat>C, PIE>5 I& 51OCarat'lii.e b r 375T:8/4 44452IIGOOI -'X889G:4h ITJ G6b'3DTI AT) I silat,~.+ 2 t53CITI @~6 it T
~BMa c963 ei tTgj~+I 6
~/I I ~
'%3>t QE
+ H'TO PLAIITYAAQ DRAIII
lscttlsc otlchits>I LoCALSA>>PC>I',EI45RIAOTj X BY
5 tteOtrA'DICI CI
@/AP,. SYE~
I l.CVCS-
IS IES+'SXILE'A'>3//)5 i
CSEf l55>5 IEE'Ca>
cal 1838 I'183t'-CI A OS
R. 6
SF 8
p C 0265 SA TAIfE Dg~~PQIINQLa,S i~It>5
pTlt I* a>laaT I 5raAC PI 6'C
SEI >855ti /CI<~~1. 818~j~ I >
p I 6rA>54
81-'PIIES.
C 4 3626>-'1ISII 0/A4'0ZSC
5.'EIGIattr * LI
MQVIrc'ailtCagg+~15 DIAS TAMIC Sg * gaa c>28
Iattt>IV~"IIPIa1 1:74 HR/ EICra r>T OIIH/, tssrrraf C0>s .
QG Cubo " t4 a sr>a L>fASIICS>46>IT
~ 5> Aklr, et>sc 2 II >tl /ta
I 5 Dell ITSrrE.A. ISATC>4 Tlt. Gt.
DIINIIIC,I>5>ITL >>5HC
af3enE(Si~~~5f2 > T, 6,~(6 Js"t l2 2 I <06 KDS
C>
Cw 24qqts4~).t I
6 T5383 Ca~rasa. R'48catOtI>3 k r>45.PPtrt. CAL 5Th>50
I,5~441I hLL IS LATIOII hMEI CIIECI. VhLPES 'tl>T>I acs+DtgSTII
ITEN> VC. shIS SIIEET. MALLSE.SPEC 8729.
C >is'ZID-c'IQ SPE>IT R.'EL PliSAIL~ '4
ht
LNI
4:
5 sl57 /4SZJ'Erot
as
5' 52 f883'ISr' BGIZI~,
IIIIGIDBY>KP,ls
24I~ Cs/QSc
4.REV 8
tg Last
I I835 I
tat>I IIa IWIZ
(4 >CPH5 Luru
TI
~j.h"~ teCII
j — 5err'E"cai.t3
183AIM c r 628~&2613 I l D6H>
58lta 5 UO9
IQSsr
2l13L~!fZKF Ettflfs
IO C;. ~~r.c 434 'j.=.".~0i.f ~TTz 5Y5
OCR+I $6~3
SIIEET IIO gP QF SHE E75Itt>L
P.G.LECQ QCIA NII
104628
'EE
D>6>.IQEO83 ~ ATPEE hlhfUC tJrA SPEC sltf, L3 C-O25O'..-,EVIPORARf STRhluER ls Pwoao lu -.RZ SPOOL
,3l.c ll ALCPSIIIA xL +'+ca otfa>NL IIIITIhc PLI>5HINc» CDEIIAI>ot>3ciflhftIE>'so.,a M REDISIILO.SEFCRE Ir-Att» 6Th'-"I
I, 'Attlatt 'StaTEC IS CCIITAIIJIIATEO EUIIO PLhh56E,~'4ITII Nosf 8188 MIJsT 8E IIISTALLED.GRAIII II6 TO MISC ECLVIP. SmW Thrtk O.I.~31-8 POP 453
,AH,A LI»6 at0 638 Ercf HM, TO S>6 C&DCEar% «54O CD COOI.IICC TK..08a.c ~8 +A>js,r-j Hz TANK Trt >AID Tssc aatATR.R cY "5 P rtc
st>At(SL v>I 4'rt>t5 lt
I»tata t«Vptl il hha'O'C I
stet!a( (4 «shse '111 a»a»ts tsvts
tart ~ * I 4 4tat»C r haf 5
~ SSD»\»' ~ 14 ~~
I
jV lai»f I 1 r'III I rA
[»s 1 S)Iatieltm) ','jttgii-~ASSC ~ 1C S
«.4 ~, tt i
44 ~ ~ ~~ «t ltrh NN Whet ilr .l~ i t 4 nh lass t asset
r (E~OO'at4rf
t"a»t ~ I
h asl St ectasetIt»A"1 L)tstII 4«tae.a
TO llltalCOlt
5 1 I ~~ 'Sta I Nr,,tat ~ ILT:LTC
I1CCII44
W SttaiC tlt ~~ C'» e«IN'.I
I.Ir~tt 'O:LCATIIIO
'ATCO II.N»5 ~
SIC'»watts
1$ NN.N S,Tetr!
I IC'I5 i«'
Cl )ats C Te5
I»Irl)» C»LOI Sat t)...gfs!'a<ter»
(0 SS 15 4 ra
~rNCI!5' craleta ~
Stsc ahli I.'4th «~tr
It5 Sf154 riI 4NI SIS
htO IS)f 4«SCC 4
tera ~ ITStCTOC
tat» t 5 CllhtlseltCTOCA »ra ~ Ia "~
» tf11 'rh'I St Lr
4I.T sshatt 5 10 IIN 4pc's 0 le«sr Q44 t
Cl)tfr»NC C
AC.
t~ SOIClt
41 ~ itS
cata« 'pa I
terai
~I I
~ at'LSL)l I aCihrtia ~—f.rll Vl I~
)$ raj
rraa railsSs»hl 4&
I'st aiLVa ~ l)PO
4 raC» I1s-t,
i X
SA 1 II1
W1'
N ~ a%&LC'0
ONS.IC
I:t»IIN eras «La» 4 ~lit ''s
151 C)INIIti < '«::.*C«scC.«sa CLC aa
i„» Art' rrcsaa 454 OtC„C
.tl
trt tt)SC .)
f,srt
Ll Ll 5 hie
1 tatla.
I I 'I p,~e
O)I»CA)AttCOI)ech)i«Cltsr g
r ) IV»*
Nt Ctrit
C" AS sasaW+i $44
4.75
K ETC.~ e,c ~ I
~ i~«h 14I»t»
rr'P«4 ~ St
4 W 4 2t
™) natal 4 4«' ~ .~l 4 j
W'~'I + ' it.t '«SNS'teeter(«» sf!,a, I;I7
e!1lo'I 'c swt»»44 ac I IN». 'I 5)M 4 «ehta«» rash
OS
5$etlr»a)4IC CL)1154
Itl')'.l1fitterI'
I Iia5 'shwvt
L a
)ossel o~IPIIOO
~i, ~ tQPC~~
41 AgP5$ 1)u
as!itNrc ~
At« set ott
CNt . 1 4 ~ Salsa'
SOV4 OW,IT:C
ttl 1> ~oaf4$2SL4%7e Ic
i ~44»» . S'CC
!
tits,s ~~» Sasaf
T ~ns.sltTC gtlttt&tsttasst oet
lah tsl LAttl < 1 IttldC »4474 sg
0 Satt ~'tl 4
I tr.''C ll I~4
14I I ." . CLl ' ' «Nte ~
P ~ 'jt Itt~
ta »4
I >I ICW
»as))LY',Ct rts
ria II I I,. r .-55..COttrttrtrT CLOL IST4 NCAT ASIICWaafta
~sc gsf It ts) sc clillc 'I
Inr,»'. ~WWWWWW EEI WW.'IS's~)a . ~Otfrsew wwwwwwww
1!faSCstfsltsrr»wwaas'tg
'Ii)ttert!5
Cht
7a vr)r 1O~)AICS4tttI Ctl ~
~ LCIIA>
1 LS
~ sec c»rIts-4»a»
CISI .$4 «Lil »seto 145 ih
144CC ~ V AS» ASS tlCC. 'Sall<a)
' 'Wa.SALVa
, ~ Ict~ Ilt C
I I Ia~~ Ih tt4 I,
4W~ 4 Ossa St
'as,et»sr»414»sllil4'S ah iihil ~
4
5 Stl»4«t LJICL« t
~ 'I:alI latf
Inta»4 '5 I t »4tha' Qhhet east CO
«CLA» '25
1 Tlt~ i)1 ~ Ice cr t~)'p )nji
1"N'1 XO
COSCCSSATC COOLCO
a.'AsI'i
centfates ~ '~<@/ $ 0
CZ-5/99-0ll
ats ~ «e) '-I'irO.sa>14
I a%hat ~Its '«rN
'\N
~ I ~
tt .~ »~ht la
5 ~COIL ti
«Ct ' ~ Stt«V AX~ ar
C71$-CS 24 m5W Ce Wm SXS Ca CNI WWCtdj
~ '
Srcinh w'rqtsa
l Ar tt"La) rrt la>+ t7» 'I. Sh
LINLT C
~m-C GSL 355&«1 r s»iau NN NLNI Na «ttt trul Nte
~ SSI I~ lta«caltl I1.4t ~ 'I ~
$.0. I.r.steat. IL'NAII as»IN lasts. ~iu:«ILNLNICL trl ~ ~ I, Nettle IIN. LISNhaltICI'VI
CZ-S/58% ~ r I 1st;al N 1st RC Nl
t I
steat Smg.'ttscTC 4
I ' 4 ' ILAA«4ah 'Lht W»IALI IC rat
1 . ~ i. 1' s«2 . J sts»v:4 «hrtN ~ SAT~ .M.tfe-t tTC»4«OCOS
O'Lla fi)ta rh «V I
' s:1
p Wrt44»h»
D '»5$ , tssolsao c th5,5&ttattTILTIlla Tsaic Acti j»ALL OC p~ IA»As fo ~ Ohi 1 t tsa vc»h Tristo.an,ta) rs Sl.t
I LL LISL IN at I 1 L~ll'0, Na'll w r ~ sc tae
I,NINISNNtlllt»IIILIIINIII,LIL'Ntll » 4ectaw»hh ss)th i'«arc'~ 4 Ntll. Ial.INNl. SS LSA«a«LN'\ was Xi'Sais a Lt '«I 44 ala'
I,IN IHKItltN»N N«tl 1st t.CNNLL») h«la)saM OL,N 4 isaIl,l ha&C 4 a $$ .!a» tr 4 41 Aha 444 ~II I'l aAIL tlrl. Ital. 11% ~ 'tt,asa I~
P.G8 ESea CCT
(0 QCALVtNCS No.
s ccls 0 46 2 8Jv.r IJ
1Nf rata Ola 14 rat 4 I ~ »lt4 4
Oltaha M ia ~ ~ I~ .I ~~ . La a» \.4'V « ll~
350 351 3M 353 3 355 h5/4 357 358 859
35 MIM NEG ILN ItsucttcO ILSV.~
3bl
.f Y
gt3 I 4,YJRPoentr 3~83
2','C'PO I«
I ~s '0:o.~» ~-r.E 4 < ryts .313>l '-
QCI6630 I 25'3 '2 o.
~L« g4t. IPV,;A+,'PCLII I
SK44EOEOLI
.I CQtSCRCOYLRLIOT3 -- ~ « .«««r.«««is
DUPLICATED HERB TO HAKE UNIT 2 DWO
COMPLETE AND INDBPENDEtT OR UNIT 1 DjfOjgs.A 5 33)I ~
I III IRI«tr-~463PR EP ~ I I ggslI'P r
&I
FW 145-PI95'i1407t . FZe,
I':
64f
Frr-IZrs ri33
z z
HX435I
.2W"45 -PC 4 6-1 IIIEL
333
2=5".- ItfQO
I
~t74O j> «213
I tIOsCRI Vt W4732t
>46.C42I
3IIItttSFSR tP. 0 Z r'got
232.'7RIGSI75ICIXiGYRC7I«<r
IW(E IF W.7CAIISF1LC PP
03 9 4442)
~ ., ~ .'.I
51i]
45 3
It', GLQDo.
3rnl ro I
IP~D Fiv-120 834-I fW 105.421-1
..I6 rtvrsl
!f RY-Zc
RV IRr231,51%
~ melOeal.Cf%%W715 PF5.%%CCMLS fIO
959 j4) Vtr6631 87. 19(oS«5.3 '6~r Iles
JI4OOEEiZ6 -7f6'EQ
IPI PI gc - It
cj
p..4J
G OZI9C 'Z45
Osl
v.OZIO
Qi
i~- .219 IGI
w OYI',
s35'5~+
i 3654l.) FIPct ICL5 412I't>CC O7 Yot
I
Fcr s"5-R 0 Io1t
IIY Z7RsEy'I '.SR 5'!4
t=e56
I IQ Y--co73 „ I Rt:ts. oot 1.8R
~33" 3* . COOLER (EEOOo o.0.4 S«-30
~ ~R(,
~ 24 't vs I'lIttta f 59 6 02t9
,, g g 64k 19
7AR'I Itf ~ V.. fI cI (ttOTI 7)
t t Etv'3I.BC;I.= IcL'<it ~
'I
:I EI. 8KL
~ (UNI7 I Ot«I.Y)I."=-= "=
r"+61s,
t0 'p,'RT P > MP
IDENTICAL D'EfO OR COMNON EQUZP3fEIfT Ij: PIPING
SHORf ON UNIT 1 DtfO (102028) ZS
;4liQTI= I:4 VIrst VV. o ~ .s 5 'I 1 I i.
Rt. CE«PL Ott'Rr' lpo87 II SitsLFF 4P 4: IC,
'+-~OL
co= RE.L IRIDO.14
I /R it'. ( + ''= I l A5%"es .. sa o I <ts w'tt..ts;i:ttsrifc .'4"-sP.SP36 67I4.
4 I L P colt.s 4t. Eic «Ra . Iri
r.. I:Y,LF-ZI.6 CEMR lVO 558t EERY 5>«'
'aVRrc.tr,t„4Y .t I',"3;
UNIT.I'UEl HANDLING BLDG.UNA -2
3 5 5 N . —™r'I
~T Ie. OF, '1I55T5s
\ 3 RO I'I
j,i:; MjM tjelI,
370 37I 37 7 7 7 37 377
A«
~L
SXPANS!ONTAN+
~-nasas> 'g' r 4«»Z'.««s» IIE, » 4sss0 V ass s
RV-7I
VKNT
5 ."I.'y w i»g
.'~l
(7 W T IP
)~IIjC
CI" c=--. 3
a'a$
kl~01
I
r~ . «,« S
~be)
« '
DIKSGIExbiwE2-2 «X.'Iar pIIIsIP+
ha 83'«sC sr+ r8 .s l
«"."3-'--~-~~.- '"'<-WAS!C gfp «r
~In'ZWPS
') <PS M r
p«~«(."„pr,Sst.g CSs~r
'loser
«(Ts'pII Ips
I ~t'J~T=PNOTS 4
0 ril»'I"I=-
SC'PTERCOOI
CRc7II QHGINK
I
.m4-II mmaI I:„'IL '
b
TCv 3PkOIAT4%$
"5''.s-'s
I5:<'IES.s
5I'. PASS,
I~s~ s i~cdVst=ls ': 5HVIC—: 0Yh1.
sV Ps7»EsS.Ew - »I R'stsiSPRE. C IIC I..sJ.. v:s1Ia AMRS~r7W rM$9:K Gssb. ~ AR GKT,
r W Fwi~ Erss P%» ss«S: 0 >Pj'4w/CA»c"-x~a'T=-< ~-.~T
«.W RAbIA.OII 8Y FASS YAsVF.<tow Jsb, TsKVn. «VMsII«l GI'ss.~t'.s s«s,ss O'« "'
Ass�«s
s ssp \ssSSs.sssss«.ZW. HE'ss C's7:«re.'W"-. ITIS
IsIIsi I IsS
c.07
9
85IO7
II%ITI -Sr Iss»7
7r74
IOII OC.
!08 .
«89ss 4rs'
04IO5I Og
MIDLINE O'ACKE. WATER, OOLlhl Cs~g+TOPI CA!- FOR 2 EN&-GEH IINI% (2;242.-I)
R s u!Ice 'C-CC30c'e-17~ A',-g
JW, FWW 8AI AHG!NGsOiZ: FIGE
%iV.EXI4sII hen TK P~~w Pc»s)EF CAP
I.OII'Zn'EXPAND~!uV~I.aE ~89
IOG!07'7I
IO9!05
7»n n»s
9!I!0III75
'sI 80
«):.AI =Ac- ~ = SC.
:: „ f0 74 I-'6 s.s
%,»~C
g S.a~a-c.p .
«lV. %EGEOZE I'sI s~n QR
JW LX+nssssg!0s«Tg. ''j,s»"JW T»V4 II sCA PZ
W T V4 IXr'!CAT"a
PI gsn .
7050G
I040
G4977
5C7
C48s4
509la 4 r
RBP PWG l0202l Sgf $ Pgy, ll
35 M(M NEG $ ggy~g ~ $ ~2.6.&.EC
Swn'xh 37 orIsl4L%1IIO IIII»!OsSR
104628
WHSE.+
3 s
3bl
"Act' ig'wCP
Q" pcP
12'A P
.I~I L Pr FCloi I ardR 58Ã5CHAQG5 P'ylI
II'IvG y39log~ ACP
HOT=5:1. AC> A53c5 05 ~~bohr ~'o'E
Z. > 'SdLATlo'< A<o 4+M< ya~ laeg5>BE Pl .4 C'Cg Vaa'a 'IO 54>E'E SC'BC )7 4
8. + Z OIA>5 PZ I Ob Td BE CP'c'eCC~EOrsvOCBT ~O'V ~ 5 Cv C.:!'E ~Beg. CCOQO 55 4 3~>-~
Ii AIMa59 96 ~
WE& IrZ=5=RvdlZ.
IA5'IC5GA;6
%<5 c g.'/0 IZ;0- I&
5'o55 rdwZ AI!IAQSPITCH
E4~PIP N$~
Iy X
VAC ~ 5 OLCPBO<CCI
CoccaereS*TC 4lwC
>I.AsJ f
12 aca
s AGP 5'-IIIG8 c'+'YP(<) L y~s yoga
IYiL3'
l, =..'.,HA «P- N
5<5 oT ~
PPS ~IIEAQCRWA
F5 Q p r.' o',
'rZ*%{» cRVg I-dC79 >O'
G ct 277ocl
Ie47 ~
igfIC-45SO-@
IK.HIS 4
I tcv,TENTI ~,-~s.=~
I t'B:.s "Q
(Ver I)I 'fI - --.I~E
IEJg ~7~~. (c>
5'v NE 7!IhP>" Zl~"igV
,ock LO'y4TEZV 5 5
l»IIL.g~44CE7
0W Tg(g»Bi@
Sio*PJCs
P-OIO2
:p c,.o~z
< "3'.gYO 54
5' ~ I g. vv>p - 152&L'J
r. TW~.4,>C~ rC,>g~r-y245
5~6OO-o
Alh( PttPitOOP5aczml
((1tHITZ)
<ca,'=wE-h.i, 9 3 ~ ~ E.IATC
13,ir 5,ioq
l ~ (JI~i 2 I
POOR CO,
UNIT-2
OI OO ~ I IO OO
RM INOGap
O-39I 394 395 396 397 398 399
~ 4 ~ IC aat ~ I( 'C P,t ~ 1Caus aa aat .I"",tmh(4 1 = 4C 44$ $ 4 S t I
7($4() r p I
~ rf ~ I i fsl -- 4 ~ I I~ ~ Ia)a f ~ (IS I ~ ~ ht JI ~ sh 6 saCC 4 ~ $ 44$ , «aaf 44 a
~ ~ tl it)7 ~ p raha
«y 4 4 rsf4 I~ 'I$ $ ~ $ $ ~ h ~
syICC ~ . 4 I''
$ 1
CC
it ~
a)sva~ 'ail
dstrsalsCatt((I't~ It~
~s>p
$41~ ~ Vtl'4
IZ II,(I
Vaiit~~ yr)'~ Sa I
VI~ Cl~ I
/I( .+&1
lst 1 ~ ~
~'r FÃ7
~lht
sgs'
~ th
stats ! Cr(at(—I;tt)YQ Ca»h
~j('tll
ti,P
(ah IC I'I hr(, (tat ~ (
h'
~
t I) htt.aC'T,'.
.IP4'L (at4-
$
'$4$
(e~) f tcct,'~!
I(4(I,~ I
~
~(PP4. Vy(-.rl
@((ChasR(
4)sa C hs( ~
~ XQ P(hs($
e'"'St h4$
Cars
I)t($ I(ad'td
.L lt (hVI l ~ 4(t
Psahs(t tsrsh'.
Q~ . «I arp a)I(
~ . ~ I
AV ), hh
Sa IV4 4 Vva I has ast( ~~ $ Sra f~ I ~ ttl
I~ca.
Vsaf /I'» /
I Qc'I)
~ P \htg L
:Is LVi ~~~
~cthis
"tR.Saif
J
I
III
I
I
II
J
~ ss'
tpOtsaaa I di
I'I4 a~i
JC I va ~ lcl
Ia I hh ~
L
P't( Vtt(fel
Lc. C(i
h) tl ~
aht \ ~hl hr»
J I
Sa Cvsfhs
it I ~)~SI Iaafh(sr 1 (( I
atta ag
I(h)tas 4
~ 4 ~
Sita
a4 pas
S
$ ($W 47~ IS ts
@II 1(sr
r.'hst(4 rI ~
~ =—J( S
"'lv~ ~ I
s'tu< ddj "~a'l ~ tahar ~api
44
4I'Ctl~ I+
Crt „~Cs t Il»
K7 (acsh
»rara
S'a r C sr~ ~hr,a sa %) $ Ctt $ shh
~I 4 rt vaf) Cj
4 Sahi rsi C'$ ~ )hssat 2 —.
Phs)fa $(C dtl Q'ft a~
a(aIO
~~aaatt ~I
)~at\ I+I
I t Is Ia«t~s
' I~I, I, »~~a(~$$ (4'a)r
~ h
~ a.v ~ ) ~ r t \I ClaI
M C
„"faaah
I ~ lt s
) (IS~ 44 V'F ~
UNT-2 l
8 ECO.l7oeezelc
Chf»h~ I4 ~ \I(» Q ss
/~$ 4 ~ Ig)
V tt Sat tahh~ ceca ~aZV$B(At¹T9 JdSL AC
P. G.,I'c 4 t&4> 4 C Ss,
ar 4».'1 ...('ha 4 I'Va i.
C9LLJK
lAPl
OLLL
LLLA'
LEGEND FOR NOE EXEMPTION COLOR COOING
1. COLOR COOING USED IN IDENTIFYING COMPONENTSEXEMPT FROH NOE+
A. CLASS 1 EXEMPTION CRITERIA:
W(BC'OMPONENT CONNECTIONS. PIPING, ANDASSOCIATEO VALVES (ANO THEIR SUPPORTS) ARE ~
ONE-INCH NOMINAL PIPE SIZE ANO SMALLER.
B. CLASS 2 EXEMPTION CRITERIA:
(GREEN2L (13 COMPONENTS OF SYSTEMS ORPORTIONS OF SYSTEHS THAT DURING NORMAL PLANTOPERAT1NG CONDITIONS+ )I'RE NOTREQUIRED TO OPERATE OR PERFORM A SYSTEMFUNCTION BUT REMAIN FLOODEO UNDER STATICCONDITIONS AT A PRESSURE OF AT LEAST BOY OFTHE PRESSURE THAT THE COMPONENT OR SYSTEMWILL BE SUBJECTED TO WHEN REQUIRED TOOPERATE'R
QZK~ E2) COMPONENTS OF SYSTEMS ORPORTIONS OF SYSTEMS, OTHER THAN RESIDUALHEAT REMOVAL SYSTEMS AND EMERGENCY CORECOOLING. SYSTEMS, THAT ARE NOT REQUIRED TOOPERATE ABOVE A PRESSURE OF 275 PSIG(1900I<PQ) OR ABOVE A TEMPERATURE OF 200'F(93C) ; OR
(YELLOYi)> (3i COMMPONENT CONNECTIONS(INCLUDING NOZZLES IN VESSELS AND PUMPS',,PIPING ANO ASSOCIATEO VALVES. ANO VESSELS(ANO THEIR SUPPORTS) THAT ARE 4 IN.NOMINAL PIPE SIZE AND SMALLER.
C. CLASS 3 EXEMPTION CRITERIA:
QHKCEEg) COMPONFNT CONNECTIONS, PIPINGAND ASSOCIATEO VALVES (ANO THEIR SUPPORTS)THAT ARE FOUR INCH NOMINAL PIPE SIZE ANDSMALLER.
%+NORMAL CONDITIONS INCLUDE OPERATING CONDITIONSDURING. REACTOR STARTUP, OPERATION AT POWER. HOTSTANDBY, ANO REACTOR COOLOOWN TO COLO SHUTDOWNCONDITIONS ~ TEST CONDITIONS ARE EXCLUDEOL
9f MDE- NONES'TRO'CTIYE E)CAhfWATIOA'.
P.6.8 ECG
LLUNIT - 2
g~gT LLO. ~i OS'HKKTSgeA~ LLVLLdELI gHANCK
104628
CNANIK I Sofia(4/( J ISIS
SV L.IION(AD(/N.CUTIWCIJ/AlieloAITIKATDFnl COOIAUCTGI
CNCNCK 2 I(AY Cx. CTR
src J.x. Mxrkactx/L,Y. IWALAC/k.s. MEED
Aarruuc Nueces DF ~AKIN Fr/IN)5okccAI(ce Ac(co IO ALL 'IcuacvlciIN(r(CIIDIIONHCIICS ALL OccNCCScLDUD(0 uo IaiucLCO
Qua(f5 LI5'IC(l S(IOO CAC IrcC AKQLI g THAU Q0/ I/ACNI pvIN4 $ocaurxcsCNuc($
>02007
l02006
4
4a
4(>
5$
SO((20
(0(2(4
(5
cPA>CGFI ix2NA SCK/c/DL
56hk7
5
IO
~ IO((20
C>(00>Hxfi'u
27
3(
33
27
10 r
ci 30c
3(
((>20 IO.
l02OI 2
20 ci
IO20(0 35]
)A>r2: dK.k',2'.(Ia",4h >COTUSEO
rronr»>(> 1>>3791)57>ON5
GOUT I ( 1 9 f>cc n>IOre(9 >I D- - - cl o n- u >I
K(oxfsca2322222110
RR. I(EDITSPceo 2 I
PA(CIVIC KLitfruica 1
$fia Mica KATIl(uucWI2 1
CGCI AICUSCLGIAASINO PIAFS
ccoeaaeroaTACRS
>VENT FUEL PXTJIAI EA(Hu/cfaJ>5IIAN CtNCMIOS
K
~atssvai Icep(LIEF Iui(I
. Guaexao puosc
1415 pccus uoA($IDVAL KAIllacuk(a
l
I'CCHI, f/AAV,PPS
5PCNT FICL Pir
SHCt'll 4.14 I 14
accr 55
SHEETS io real 41
c
trfcl 2
'leuc DF (Huocs$/kfIeoxa cooNC ifcaa
((csx21xonOKCI(o.k 1/i PVC faoa ICV.I 4 ICY 0 fck IHE
P(AO THAVIT ANO AEAII SEAAINI Cooaicn(Ptk CCO.G(-tio Cf 2 14 tl)
DCLCIEO I/uc OA5 uuivxfa PEPINO Al Pan IMIIONIe, cclluktN QPPLV LINC llKNCIMII(N42 uu Palcuar Silfk QFPLT ATPINE'IAIIIDIat.(Pak DCO.CN.S(2 SCV. 1 OF $.24 Sl)
CCat)CD.COFDHfal GXLINIklrfa DIFLICAlloa.IHOCR ON SKCI 44.(FEA cco.ac.eit atY. 1 OF 5 24.$ 1)
DELETED.CCHPCNENf COOLINO OITEA OVPLICAIIOCQouc oc SHEE( $5.(PIC( DCO CN.S(2 ACV. 1 DF 2 24 II)
CCLtrlO-LCRC AHO CEAk OIL P(RIIO(5 (NOT TIC COCCI(ptA Dco.ac-ect AKY I OF 5 2I Il>
CKLtllo.a'Irccoeac Slc>PLY lINES Al PEK'IklrlcN 41(pla oco.fk.s(2 atv. I DF $ 24 II)ocurio A~r(R sufi't Lien SKIKG( vuvfs
$>IIA ANO sure Tuac PCNCIAAII(H Ie.(PKA DCO.CN sit AIV I CF S.tl Il)
D(urco c(UFCKcn ccoaxNS ocrca Dvparcelr(NCN OC IKEI 4>.
(pca Dco.(H sia acY 1 OF $ .24 el)Ccaf TED (CHIAicecDci NITIVC(N SVFLT HEADER
Duu PINKIklTIO( St.(pca cco-ac.sca aw. t of ~.Ir.e»
Kvli(0 AM/OCKO DI PLA(t FCV.S5 IVPA5$ LTNK(ICV 12$ ANO Duolrac Y/LYC>(PCA DCC.EN.O>0 OF ~ IS. ~ I)
D(LKIG>.kv oc>Tul AGO(A '>0 PRESS. kCLTIF IuicQCAU POCKIMIICN Il, (NOT ilr CCCC)(PIA CCO CN tca AKY t OF ~ lr Sl)
DELCIEO.OuACICCI PCAPS Q/CT50/C KACCA RELIEFvcl'K Oc/ILtr (LINC liie)INDI 5N c(OE>(pca oco.ol ~ cx Acv I of I lr M>
DELCTto 515 Pcai'U(I IO( K/(CA AY OUTLETKIK aoil>. Ms pvro olio(. av cu(LEI(I>MS 2$ (a.alex.iesx> uo acsxovcaHEAT CAOCAACCA Ct>TLCI Av OI5(N.
, (IINE$ Icol.accu> INOI Icc cccci(Pla Oco CN Six An, 2 OF ~ II'll)
DCltTCO CONTA>cuacr SPMT P(AO OI5CN AV OUILCTHIAO(a (LIKS 2>2.2>1 Till) IN01 lcc CODC)(p(a Dco ccc e(2 AEY. i OF ~ I'I'el)
DCltltD.FVCL 'IACNI/CA IUK 'IO AEFVELINS CCNCL(COI IN CODE Ivca oco Gc eca afv. 2 DF ~ u ei>
kCVI5IO.NO LONOEA APPLICASLC To DCSCAYICKIN5/CCIIOI COCCS SVT AGAIN IN 45&Au(5 To AVOID SHECf AGA>ce(AIRScaoss A(F. E(H/Lxckixon.(Pta DCO CN tit AEY, 1 Of 2 24 Il>
CCltrnl >KET 1$ REV. 2 Itf, IO>014 acr', 2AIDED ~ IKtale ACV, I KF, la>oil $Hf, ~
DEIKICO FADC GG OF TNC DRI AS ICI LOHSAI/PLICA(AC 10 INIIAYICKOCIPCC'ITIN CODCS.(PEA CCO-Gc eit Itv. t Of ~ 11 Sll
afvxl(D.PEI DESCAIPTIDR III xrfassl DRU 4$ ASOVC ~
Accso Io Skcwru
Ace(0 Or Dipa DF EIFJa AisGAGI QNKT Io.
(Evtao>WIEaan. 5
$HT, 10
an, xl
SHT. 14
an.w Qacr, 1$
Iai. ai
an. 24 QQcr. I
an. I
ocr. >o I/>a.
@54'.
I,
Qcr. $ 1
Qcr. 24 Qan. 14
@cs
g4.@41
Qktl5 ~ .14.1$
SKKT ceuefkxca,cccoss clcfiaacf
SYI J,a. ITCXTICINX/L.Y,IWCALAC/0.$~ RCCfo
OCLKI(o.saui( Qcfcrs.(Kk OCO fN.10)5 RCV 1 OF I.te.ll)
AIYI5to.AS kraal OF GGI AIOVK(PE4 CCO-EN.IO>$ an. I Of I 24 II)Qkf I IMRIAS INK'AA151OCI
Ouacc 2 (ko I t 5 ~ I I I ~ I 10 11 12 ll li Il u lc II I\ IO 'I'I 21(H/N(c ca i I 2 I ~ I 4 I I I lo ll lt II lc le II u le
al M ti 24 ac Ii Te TO 51 II ll li SI li 5> )I le ce ilal 2 I ~ 2$ Ii I 2i fe >O ll ll 4 lc >I Ii lc li Ie
AEACTDC VI$$(LYG(r sriracatlcrok vcssa.LCVKL INSTA.lca vGIT srsran
SrfAN CEKMICR~coaxuc TAcicCIENT CDCXNI(kFOI AE 2>
cca appav4 AEIUIUC
CLASS t $ (CCNCakkiica RAKON(LINcs I us suc/LKLINKS
1HHG2
acr. ~
NES SHT. 0
dlf
Qn. $ > @5
an. l$ g
an.2>
lt,ll$2
5HT I
Iesx
~ Ivcxrcuai L. Huuiic 4 A. SA(fo
Wlxulkv FtfCRATCA~uos 2 I 4 DIIQUucc
AEACIDA VfsifauKL xairauansucl van $Ts ~
CCHPCHGn COOLDce~Ta PIAPS a, 2 I $
aniff0.015oukcc vALKs (Lcv.>10.uv.> II.CCY illINO LCY Ill)KRNOcp(MTICN KDK Fecu coceuaavCLOifo ro KAM(LY0/Gc(P(R DCO.GI )24$ G' 15.$ 2)
Aooxo.rso ct) van YALKs To cor ues5 I I lnCL INSTRAKNT TWINC,Iao u> ckaiuu(ION access TALKSTo Hor LCCS 5 I ~ LCVEL IN5TRACNTsciloci HOUIIcus uo oat (I > vonVALVCIO IltACIOAKSICL Ifio LCVILINIIN/Nan llJRIIR(Ifa DRI IOROI Icv. I uaOCO EN lee ACY. I Cf (.2( Il)
~Clf'Ito SUCTION ua DISONACC CIAI$ I DMIN~ IPDCSVia Dca CN.>is OF 10.21.41)
SI IHRI 54.0
$1/Si 4't
RR, I/LTMT(aaavav Lons
Dcc > eelIVI J. ITCIININI 'T. CRI(u I A. SK(D
A(CCD YACWN KLICF MLVE5 uco Iaeerike 55$ I/OVN.VC5 kirk AQR CODC CLASS 2 PIPD(4 152.A(Ca lies ~ ~ Ct 419$ ~ ) lo Ala /IUFFLV LORS sl:eeo-t ~ e Ii-ur.ac.(Pfk OCt GC ilxlOF I Ii.u>
Acko/cruo \EA'/NlJruur/
ccrccocr AA//AV/e//ri
rococo/or Aura/uk NuuUco/ ccrircc/
ov/~NO/AY'o//rfAIIRrroceiuui I/oouf ccc/Acou1/YAucr I/ARIUo ~ec)/Ao (sar/rcccr cccccrroHH/FJ I/Vcrcu cURVAvouupN cxcrvccc Acu (HuUF IO
i/g/0 AI//Jrf/IAe rvcrrk/OO I/rcfo/cop/o~cr ~~Au Neo ur/ococ RIHov. Ice/ 0 Ar/I-I>)
A(VIC/c AFA Arc/IIiIOArcccri/ IAFOur/r/or or//4 4'//r A//oIHF
Rcrufe 4'/ Hei /Ac/IFor///co I Acuv, d/I IAAF/kccuc
RPH/Io
@I
C~~I
@r
P.G.8 F CO.104628
alt—'C I(AirI ION
Dcu>KOOIKS YilKE, I/OIRRENIS uaAQC i(OK CLASS SODRAA(c
COED LTN(t VALVES. Dniacecais uaAIK ico( (LAis oaacakxcs.(pfk cco.a(.544 DF $ .21.$ 0.
cco.ac.soe DF ~ .ts.so.Dco4N-soe AEY, t of lt 1$ .40)
A(ceo uocaras NAIEA $(FPLT FlCN FUIK,Quo(TEED Co(Loco MI(k Kru(Nv/Lcc uo AG.DCAIIDccof elise~oeocaxfs cADI cooanca uoxltero Flea FUIC onur uo aciuck FaoaMfa TALK DaCT.(Kk (Rank.eea OF I.lr.ll)
cca Incr AODCO OIIFGCINIIALPKSQRE SGOICR LiatSKAOWRCAS COOCCIIONS To CHAIN liu(5 FADC
caarxlf 5 Nr ua ccoE cG($5 (ouocaxcs(pca oco G(.102$ Acv. I cf I Ie.e»
Tlsus of ouaccs ac vrsco J>CN aloes DF xna gIfvlrfoGA5$ t I'ICNI To CIASS l ONC
T/tu PEKSSATICNMSIC DIAOIINCCtiCIOI CNT FAN COOLKAS >.f,s 0,10.1$ 1(,15.1I.C(tACTOI CO(LANT IV>F5 14.20,21,fICESS lfNXVRI KAI cxauucfa 2t.al.IIEACTOII CNT FAN Ccoa(AS 0, ~ ll,lt,u,lr.
(Pta OCO-GC.>0'IS AEY I Of 4.2S II)D(u>EO.ORLXCAT(O LINfe (ACIADNO Oc Qn, I)
(PCA OC2.GC IIW OF )2 20 il)
PGandC
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
R T 1: Reactor esseTABLE:PAGE 1 of
R
ITEM COMPONENT OR SYSTEMGNRL
IDENTIFICATION METH
T LITEMS AMOUNT 5 EXTENT PERIOD DATE
L5 REMARKS
B-A
Bl.ll
Reactor Vessel
Pressure RetainingWelds
(B1.10) Shell Welds
-Circumferential-Upper Course (to)Intermediate (to)Lower Course to)Btt H d
Serial No.C.E. 68101DWG. Ref.CE234-152-6DC663201-76
*3 1.1-1 ]
Weld No.'s
8-2019-201
10-201
UTUT
'UT
Exam area meetsor exceeds reqts.of fig. IWB2500-1and fig. IWB2500-2
(3) (Length)
543.5« 100K543.5« 100KAs Accessibl e100%
ThreeThreeThree
100100100
f*] ISI DWG
Page No.'s
Thickness10.75«
T = 8.6« TO
T = 5 3«
Relief No. 001
Bl.12 -LongitudinalUpper Course
Intermediate Course
Weld No;'s1-1-201 B
1-201C
Weld No.'s
UTUTUT
(3)
(3)
99 5«
99.5«99.5«
100K100K100K
ThreeThreeThree
100100100
T = 10.75«
Lower Course
2-201B2-201C
Welds No.'s1
3-201B3-201C
UTUTUT
UTUTUT
(3)
108.8« 100K108.8« 100K108.8« 100K
106.5« lOOX106.5« 100K106.5« 100K
ThreeThreeThree
ThreeThreeThree
100100100
100100100
T = 8.6«
T 8 6 II
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R TEM: Reactor VesseTABLE: 1.1PAGE 2 o
C R
ITEM
B-A
B1.21
COMPONENT OR SYSTEM
Reactor Vessel-Cont'dea elds
- Circumferential-
NE L D
IDENTIFICATION METH
Ser al No.C.E. 68201
[ 1.1-1 ]Weld No.'s
LITEMS AMOUNT 8 EXTENT
N
PERIOD DATE 8 REMARKS
Relief No.002
B1.22
Bottom HeadClosure Head
- Meridional. Welds-
Bottom Head
Closure Head QStudg5-6814-15823-24833-34841-42850-51
4-2026-205B
Weld No.'s
1-202A1-20281-202C1-202 D
1-202 E
1-202F
Weld No.'s
1-205A1-205 B
1-205C1-205 D
1-205 E
1-205F
RemarksRemarks
Remarks
UTUTUTUTUTUT.
(6)
(6)
2
2
Not AccessibleNot Accessible
Not Accessible
3811
3811
38II38"38"3811
100@100%*IDOLS*lOOX*lOOX*100K*
Exam'n area meetsor exceeds req'tsof figure IWB2500-
As Accessible
OneOneTwoTwoThreeThree
1733506783
100
5 311
T — 7 0"
Relief No.002
5 311
Relief No.002
T = 7.0"
*As Accessible
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION.XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
H J R ITEM: Reactor VesseTABLE: 1.PAGE 3 o
C R
ITEM COMPONENT OR SYSTEMNRL
IDENTIFICATION METH ITEMSN
AMOUNT 5 EXTENT PERIOD DATEL
5 REMARKS.
B-A
81.30
B1-40
Reactor Vessel-Cont'd [ 1.1-1 ]
Shell To Flange Weld Weld No.
7-201(From Flange)
Head To Flange Weld Weld No.
6-205A
UT
UT
(1)
1
Exam'n area meetsReq'ts of figureIWB-2500-4
As Accessible
1820 '4K182" 34K182" 345
Exam'n area meetsReq'ts of figureIWB-2500-5
As Accessible
182" 34K182" 34%182" 34K
OneTwoThree
OneTwoThree
3367
100
3367
100
Relief 8003
T = 10.75"
00
Exam. FromFlange Face
Relief No.003
T = 7.0"
B1.51(Bl.50) Re air WeldsBeltline eglon
(Vessel Base Metal)
No base metalrepairs are knownin the reactorvessel. One weldrepair each inwelds 2-2018 and2-201C are the onlyknown repair areas.
Bl.50 items notapplicable - Nobase metalrepairs inreactor vessel.
PGandE
EN YEAR EXAHINATION PROGRAH
SHE SECTION XI SYSTEHS-CLASS I
DIABLO CANYON POMER PLANT-UNIT
HAJOR ITEN: Reactor VesselTABLE: 1. 1
PAGE 4 of 9
CTGRITEM
B-DB3.90
3.100
COHPONENT OR SYSTEH
Reactor Vessel-Cont'd~II II
Mel dsAnd nozzle insideradius
GENER LIDENTIFICATION
[ 1.1-1 .I
ND
HETHL
ITEHSEX NT N
AMOUNT 8I EXTENT
xam n area meetsReq'ts of figureIMB-2500-7's Accessible
XA N
PERIOD DATEH RELI F S
8 REHARKS
Relief 8004aCode Case 1647(N-73)
Outlet Nozzle Loop 1
Outlet Nozzle Loop 2
Outlet Nozzle Loop 3
Outlet Nozzle Loop 4
Inlet Nozzle Loop 1
Inlet Nozzle Loop 2
Meld No's~1-29SPL
9338'nner
Radius
2*2-29SPL8
22'nner Radius
2*3-29SPL9
158'nner
Radius
2*4-29SPL9
202'nner
Radius
2*9»27.5SPL9
293'nner
Radius
'*10-27.5SPL8
67'nner Radius
.UTUTUT
UTUTUT
UTUTUT
UTUTUT
UTUTUT
UTUTUT
(2)'"
(6)1
360'600
3600
360360'60'00K
100K
100K
100K
100K
100K
OneThreeThree
OneThreeThree
OneThr eeThree
TwoThreeThree
TwoThreeThree
ThreeThreeThree
131313
252525
383838
505050
636363
757575
From BoreFrom Shell
From BoreFrom Shell
From BoreFrom Shell
From Bore.From Shell
From BoreFrom Shell
From BoreFrom Shell
Inlet Nozzle Loop 3 2*11-27.5SPL9
113'nner
Radius
UTUTUT
360'00K Three 88Three 88Three 88
From BoreFrom Shell
PGandE
TEN YEAR EXAMINATION PROGRAMSHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
H R T : Reactor VesseTABLE: 1.1PAGE 5 o
C T G R
ITEH COHPONENT OR SYSTEMG NER L
IDENTIFICATION METH ITEMSXHN I N
AMOUNT 5 EXTENTX H N T EXA RELIEF S
PERIOD DATE 5 REMARKS
B-D ~ Reactor Vessel-Cont'd
B3.100 Inlet Nozzle Loop 4
f 1.1-1 j'2 "12-27. 5SPL
9247'nner
Radius
UTUT
I360$ IDOL ThreeThreeThree
j100100100
From Borefrom Shell
See IWB-2500-1Footnote 5
NOTE;
B-FB5. 1D
Code Category B-Ereferences pressuretest. See Section3.2 of this volume,Class 1 of P. 1 of 2
Pressure RetainingDissimilar MetalWelds
Nozzle Safe EndsWelds
See Tab. 1.4 page 1
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
R I EM: Reactor esseTABLE: 1.1PAGE 6 of 9
ITEM COMPONENT OR SYSTEML
DENTIF ICATIONND
METH
N
ITEMS AMOUNT & EXTENTN
PERIOD DATE & REMARKS
B--
B6. 10
B6.20
B6.30
B6.40
eactor esse - ontPressure RetasningBolting (Larger Than2 in. dia.)Closure Head Nuts
Closure Studs, In Plac
Closure Studs, (when)Removed
Flange Ligaments(Between Stud Holes)
1.1-1
RPV StudNutsNo. 1(to)No. 54
RPV StudsNo. 1 (to)No. 54
RPV StudsNo. 1 (to)No. 54
RPV LigamentNo. 1(to)No.54
MT or PT
UT
UTPT or MT
UT
54
54
18 Nuts 100K1818Exams area meetsreq'ts of figureIWB-2500-12
-Remarks-
18(Remarks) 1001818Exam area meetsor exceeds req'tsof figureIWB-2500-4
18 (Remarks) 1001818
OneTwoThree
OneTwoThree
OneTwoThree
33 OD=10.56"66 HT=7.94"100
3366100
3366100
OD=6.8"L=57.7"
It is anticipatedthat studs willbe removed asscheduled,Should that notbe possible,studs will beexamined in placeas scheduled forremoved studs.Interval enddeferral is notanticipated.
* BushingsNot Applicable
Stud Holes in Flange Threads VT-1 18 (Remarks)1818
OneTwoThree
3366100
B6.50 Closure Washers,(and Bushing*)
RPV StudWasher PairNo.l(to)No.54
VT-1 54 18 Pair(Pair) 18 Pair
18 Pair
OneTwoThree
3366100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
* DIABLO CANYON POWER PLANT-UNIT
MAJOR ITEH: Reactor VesselTABLE: 1.1PAGE 7 of 9
T G RY
ITEN COMPONENT QR SYSTEMG NER L- NO
IDENTIFICATION METH
TAL X IN N
ITEMS AMOUNT & EXTENT
HlPERIOD
EX N REL F S
DATE & REMARKS
8-G-
8-7.10
8-H88.10
Reactor Vessel-Cont
Pressure Retaining Bolting(2 in. Dia. and Less)
Marmon Clamps(Bolts, Studs & Nuts)
Integrally WeldedAttachments
],.1-1
Conoseal Bolts VT-1(For) In-CareThermocouples
-Remarks-
15
Total of FiveConoseal Assy.
15 bolts 100%15 bol ts 100515 bolts lOOK
OneTwoThree
3367100
Note: All clampsand boltsexamined onceeach inspectionperiod during ascheduledrefueling outage.
B8,10 Item notapplicable-
vessel issupported byintegral castnozzle pads
8-N-1. 813.10
Vessel Interior Upper and VT-3Lower InternalsThermal ShieldDrive Rods
100K of region ofsurfaces madeaccessible byremoval ofcomponents duringnormal refuelingoutages
OneTwoThree
100100100
At firstscheduledrefueling outageand subsequentoutages atapproximatelythree yearincrements.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R : eactor esseTABLE:PAGE 9
R
ITEM
B-N-
COMPONENT OR SYSTEM
Reactor Vesse - ont
N
IDENTIFICATION METH
1. -1
ITEMSN N
AMOUNT & EXTENT PERIOD DATE 5 REMARKS
B-N-3B13.30
Removable CoreSupport Structures
- RPV-Core Barrel
Core Barrel
VT-3
VT-3
100K of regionsof welds and sur-faces made access-ible by removalof core barrel andsupporting struc-ture
Regions of corebarrel welds andsurfaces madeaccessible by corebarrels removalfrom vessel
Three 100
Three 100
Includes coresupport weldsand attachmentlugs
Examine toextent possible
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
C TEG RY
ITEM COMPONENT OR SYSTEM
Reactor Vesse - ont
GENER LIDENTIFICATION
~ 1
NDE
METH
TTLITEMS
EXAMIN TIONAMOUNT 8 EXTENT
xam. areameets or exceedsreq'ts fig.IWB-2500-18
EXAM N
PERIOD
MAJOR ITEM: Reactor VesselTABLE: 1.1PAGE 9 of 9
T E M RELIEDATE 5 REMARKS
B14.10 Welds in CRD Housing .CROM PT 73 3 Welds
360'ote:
There aretwenty-fourperipheral CRD
Housing Welds
Three 10* Surface examelected to beperformed
*1005 of Coderequirement
END OF TABLE 1.1
PGandE
TEN YEAR EXAMINATION.PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT ~
MAJOR ITEM: PressurizerTABLE: 1.PAGE
' of 3
G R
ITEM
B-B
COMPONENT OR SYSTEM
Pressurizer Vessel(B2.10) Shell to HeadWel ds
GNRLIDENTIFICATION
er>a o.W 1171BIG. Ref.DC663208-15-1
N
METH
L N
ITEMS AMOUNT 5 EXTENT
xam n area meetsor exceeds req'tsof FigureIWB-2500-1 andFigure IWB-2500-2
X 1NPERIOD
R LIDATE 5 REMARKS
* SI DW
Page No.'sof Figure
B2.11
B2.12
- Circumferential-
Bottom Head toLower Course .
Upper Course toTop Head
-Longi tudinal-Lower Course 8Bottom Head
Upper Course 8Top Head
* [1.2-1j
Weld No.
Weld No.
Weld No.ong
Weld No.Long
UT
UT
UT
UT
(2)
97" lOOX97 II
97 I I
112" 7X
12" 9L1
(2) (Length)
97" 100K97"97 l I
OneTwoThree
OneTwoThree
One
Two
3366100
3366100
07
09
T=42"L = 291"
Note remarksfor B2.12T = 4.2"L =
291I'chedule
examarea for firstand second periodto enablecoincidentexamination ofcircumferentialand longitudinalwelds
~ equals 100Kof Code req't
PGandE
EN YEAR EXAHlNATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
HAJ R IT H: PressurizerTABLE: 1.2PAGE 2 o 3
T G R
ITEM
-B
2. 20
2.212.22
B-D3.1103.120
COMPONENT OR SYSTEM
Pressurizer Vessel-ont
Head Welds
-Circumferential (and.j-Meridional
Nozzle to Vessel WeldsNozz e Inside Radius
GENER L NDE
IDENTIFICATION METH',
-1,-Remarks«
T LITEMS
X IN TI N
AMOUNT 8 EXTENT
Exam area meetsreq'ts of Fig.IMB-2500-7 asaccessible
XHNPERIOD
XHRLDATE 8 REMARKS
B .20 items arenot applicableupper and lowerheads are castcarbon steel
Inner Radius-Relief 004Surge Nozzle-Relief 004Bottom Head
Surge Line Nozzle9 Line 2*16-16-SPL
Spray Line Nozzle9 Line 2S6-15.4SPL
Relief Line Nozzle9 Line 2S6-730-6SPL
Safety Nozzle9 Line 2S6-729-6SPL
Safety Nozzle9 Line 2SG-728-GSPL
Safety Nozzle9 Line 2S6-727-6SPL
MIB-439 N/SInner Radius
MIB-346 N/SInner Radius
WIB-379 N/SInner Radius
WIB-368 N/SInner Radius
MIB-422A N/S'nner Radius
WIB-358 N/SInner Radius
UTRemarks
UTRemarks
UTRemarks
UTRemarks
UTRemarks
UTRemarks
1 100$as accessible
1 100K
100%
100K
IDOLS
lOOX
100
100
66
100
Center of tophead
81'.W. frommanway C.L,
147'.W. frommanway C.L.
213'.M. frommanway C.L.
279'.M. frommanway C.L.
100 Bottom Head
TE: Code Category B-E references pressure test. See section 3.2 of this volume, Class 1 P. 1 of 2.
-F5.20
Pressure RetainingDissimilar MetalWelds
See Tab. 1.4Page 2
PGandE
EN YEAR EXAMINATION PROGRAM
SHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PressurizerTABLE: 1.2PAGE 3 of
C R
ITEM
-G-1
6.606.70
-G-27.20
COMPONENT OR SYSTEM
ressurlzer esse-ont
Pressure Retaining Bolting(Larger Than 2 In. Dia.)
Bolts & Studs, In placeBolts & Studs, WhenRemoved
Pressure RetainingBolting (2 in. dia.and less)
GN L 'DIDENTIFICATION METH
-Remarks-
[ 1.2-1 ]
L N
ITEMS AMOUNT & EXTENT
Bolts
R L E
PERIOD DATE & REMARKS
B6.60 & B6.70Item notapplicable
Upper Head Manway Bolting (VT-1) 16 5 (Remarks) 100K One5 Two6 Three
3162100
Bolting may beexamined inplace, or whenremoved.(accessiblesurfaces)
-H8.20
Vessel SupportsIntegrally welded(Support) attachments
Support Skirt
[ 1.2-1 ]Weld No.
Girth 10 (UT) lOOX
Exam area meetsor exceeds req'tsof Fig. IWB-2500-1497 II
97 II
97 II
One 33Two 66Three 100
T —1 5"
L = 291"
PGandR
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Steam GeneratorsTABLE: l.PAGE 1 of
ITEM COMPONENT OR SYSTEMN
IDENTIFICATION METHL
ITEMS AMOUNT 8( EXTENT PERIOD 8( REMARKS
B-8
B2.31B2.32
Steam GeneratorsPnmary s e-- Remarks-
(82.30) Head Welds
Circumferential andMeridional Welds
DWG. REF.DC-663206-77-1
I
-Remarks-Exam'n area meetsor exceeds req'tsof figureIWB-2500-6(B)
See section 2.0for secondaryside
E*j ISI DWG.
Page No.'s
B2.31 5 B2.32Items notapplicable,channel heads arecast cabon steel
B2.40 Tubesheet to HeadWelds
Steam Generator 2-1(Serial No. 1161)
Weld No.
Channel Hd 2-1 UT
(4) Length
12'2I12'00K One
TwoThree
3366100
T — 5 16"L =
36'team
Generator 2-2(Serial No. 1162)
Channel Hd 2-2 UT 12'2'2'00K OneTwoThree
3366100
Steam Generator 2-3(Serial No. 1163)
Channel Hd 2-3 UT 12'2'2'00K OneTwoThree
3366100
Steam Generator 2-4(Serial No. 1164)
Channel Hd 2-4 UT 12'2I12'00K One
TwoThree
3366100
PGandE
EN YEAR EXAMINATION PROGRAM
SHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Steam GeneratorsTABLE:PAGE 2 o
TEG R
ITEM COMPONENT OR SYSTEMGNE L
IDENTIFICATIONND
METHTL IN I
ITEMS AMOUNT 5 EXTENT PERIODE ) L
DATE 5 REMARKS
8-D
B3.130B3.140
Steam Generators-ont
Nozzle to Vessel Weldsand Nozzle inside RadiusSection
[ 1.3-1 ]
-Remarks-4
Category B-D, FullPenetration Wel dsof Nozzles inVessels does notapply to DiabloCanyon SteamGenerators. CodeFig. IWB-2500-7does not apply.Nozzles areintegrally cast.
Nozzles areintegrally castto channel head
NOTE: Code Category B-E Not Applicable to Stm. Gen.'s
B-FB5.30
Steam Generators-ont
Pressure RetainingDissimiliar HetalWelds
(Channel Head)
See Table 1.4 page 3
[ 1.3-1 ]
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R TEM: Steam GeneratorsTABLE: 1.3PAGE 3 o
C TEG R
ITEM COMPONENT OR SYSTEMG NER L
IDENTIFICATIONNDE
METH
L E IN N
ITEMS AMOUNT 5 EXTENT PERIODRLE
DATE 5 REMARKS
B-G-1
B-G-2B7.30
Steam Generators-ont
Pressure RetainingBolting (LargerThan 2 in. dia.)
Pressure RetainingBolting (2- In. Dia.and Less)
[1.3-13
-Remarks-
Channel Hd~ytl g
128. "M)
(Each)(Remarks)
B-G-1 ItemsNot Applicable
Steam Generator 2-1
Steam Generator 2-2
Steam Generator 2-3
Steam Generator 2-4
No. 1(to) No. 16
No. 1(to) No. 16
No. 1(to) No.16 .
No. 1(to) No.16
VT-1VT-1
VT-1VT-1
VT-.1VT-.1
VT-1VT-1
.1616(32)16
'16(32)1616(32)1616
1616
1616
1616
1616
100K
100K
100K
100K
OneOne
TwoTwo
ThreeThree
ThreeThree
1225
3750
6275
87100
InletOutlet
InletOutlet
InletOutlet
InletOutlet
B-HB8.30
Integrally WeldedVessel Supports
-Remarks- B8.30 Item notapplicable. Vesselis supported byintegrally castpads
PGandE . DIABLO CANYON POMER PLANT-UNIT
TEN YEAR EXAMINATION PROCiRAM
SME SECTION XI SYSTEMS»CLASS I
C EG RY
ITEM COMPONENT OR SYSTEMGNRL
IDENTIFICATIONNDE
METH
T L N N
ITEMS AHOUNT 5 DTENT PERIOD
HA )OR ITEM: Steam GeneratorsTABLE: 1.3PAGE 4 of 4
AHRL F
DATE 8 REMARKS
B-Q
Steam Generator'sCont d
Steam Generator Tubing
816.10 Straight Tube Design
B16.20 U-Tube Design
(Steam Gener ator)
-Remarks-
~Tube Ha
Gen 2»1Gen 2-2Gen 2-3Gen 2-4
ETETET.ET
Tubes (For Info. ONLY)-Note Remarks-
',38S 102 (*) 3%
3,38S 102 *) 3X3,38S 102 (*) 3X3,38S 102 (*) 3l
10CFR50 RequiresProgram to beBased on thePlants ApprovedTechnicalSpecification3/4.4.5
Ref:10CFR50.55a(b)(2)(iii)
816.10 ItemNot Applicable
*ReferenceTechnicalSpecification forInspectionRequirements
End Of Table 1.3
PGandE DIABLO CANYON POWER PLANT-UNIT
EN YEAR EXAHINATION PROGRAHSHE SECTION XI SYSTEHS-CLASS I 57
HA 1 R ITEH: Pi inq MeldsTABLE: 1.4PAGE i of
ASHE SECTION XI CODE CLASS I PIPING SYSTEH WELDS
The extent and frequency of examination for pipe welds scheduled in the following table conforms toTables IMB-2500 and IMB-2600, Category B-J, in the 1974 Edition of Section XI through Summer l975Addenda. This requires all of the area of 25K of-the circumferential joints, including the adjoining)-foot section of longitudinal joints, and 25K of the pipe branch connection joints to be examinedeach inspection interval. Meld selection distribution has been made to assure a representativesampling from all Code Class I lines in the Plant.
NDTE; An internal inconsistency in the Summer 1978 Addenda required branch connection welds between two andfaut inches nominal branch size to receive volumetric examination, while pipe welds only requirevolumetric examination if they are four inch nominal pipe size or greater. This condition wascorrected in the Minter 1980 Addenda (referenced in 10CFR50.55a). to require volumetric examination ofthose branch connections greater than nr equal to four inch diameter. As a result, branch connectionsfour inches and greater nominal diameter are scheduled for volumetric and surface examiantion, whilethose less than four inch diameter are scheduled for surface examiantion only.
Occasional portions of certain pipe welds are inaccessible for exa'mination. See request for reliefWOE-008. Any inaccessib)e portions will be fully documented and the remaining weld area examined to thefullest extent possible.
Ref. IOCFR50.55 a (b)(2)(ii)
PGandE
ASME SECTION XI SYSTEMS-CLASS 2
.DIABLO CANYON POWER PLANT-UNIT 2
J 1 ln .. e S
TABLE:PAGE 1 o
C TEGOR
ITEM COMPONENT OR SYSTEMGENERAL
IDENTIFICATIONNDE
METH
T L E A I N
ITEMS AMOUNT gi EXTENTE N
PERIOD DATEE EL S
8 REMARKS
B-F
B5.50
Pressure Retainin1sslml lar eta
ggg
~Pi in -Safe End Welds
Reactor VesselWPPgp,pip 3
welded directly'-to RPV cladbuttering. "Pup" to pipe is notconsidered a bi-metal weld jointNote B9.10 for system schedulecontinuation
Volumetric exam scheduledcoincident with vessel nozzleexam. per Section'XI
See Appendix A forpiping schedule/cal. std.Exam area meets or exceedreqt's of Fig. IWB-2500-8
Welds are thesame as Cat'yB-F, B5.10
Reactor Vessel
Inlet Nozzle(RC2-1)
Loop 1
[1.4-1]
Outlet Nozzle Loop 1
(RC2-1) [1.4-1]
Outlet Nozzle Loop 2(RC2-2) [1.4-2]
Outlet Nozzle Loop 3(RC2-3) [1.4-3]
Outlet Nozzle Loop 4(RC2-4) [1.4-4]
Weld No.'s8 Line No.'sWIB-RC-1-1SE2*1-29SPL
WIB-RC-2-1SE2*2-29SPL
WIB-RC-3-1SE2*3-29SPL
WIB-RC-4-1SE2*4-29SPL
WIB-RC-1-16SE2*9-27.5SPL
PTUT
PTUT
PTUT
PTUT
PTUT
8(2)
1
(6)1
(Length)
360'600
360'60o360'00K
100K
100K
100K
100K
OneOne
OneOne
OneOne
TwoTwo
'6
TwoTwo
25(Vol)
38(Sur)
63(Sur)
[ ] ISI DWG.
.,Page No.'s
ConstructionDwg.Page No..'s
Inlet Nozzle Loop 2(RC2-2) [1.4-2]
Inlet Nozzle Loop 3(RC2-3) [1.4-3]
WI8-RC-2-16SE2*10-27.5SPL
WIB-RC-3-l6SE2*11-27.5SPL
PTUT
PTUT
1
360'600
100K
100K
ThreeThree
ThreeThree
PGandE
EN YEAR EXAMINATION PROGRAM.
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
M R : Ps n S.E. We sTABLE:PAGE 2 : o 5
ITEM COMPONENT OR SYSTEMR
IDENTIFICATION METH -ITEMS AMOUNT 5 EXTENT PERIOD DATE 8 REMARKS
B-FB5.50
Pressure Retaininass>ms sar eta
Weld No.'s
Inlet Nozzle Loop 4.(RC2-4) [1.4-4]'
IB-RC-4-16SE2*12-27.5SPL
PTUT
360o 100K ThreeThree
100(Sur,Vol)
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
JOR ITEM: P in S.E. WeldsTABLE:
.PAGE 3 of
ITEM COMPONENT OR SYSTEM IDENTIFICATION METHL
ITFPlS AMOUNT 8 EXTENT PERIOD DATE 5 REMARKS
B-F
B5.50
Piping-Safe Ends,Cont'd
Pressurizer (B5.20
Nozzle end reducer sections are Exam area meets316 SS welded directly to nozzle. or exceeds req'tsReducer- to pipe is not considered of fig. IWB-2500L8a Bi-metal weld joint .
Welds are thesame as cat'yB-F, B5.20
- Tab. 1.2
Note B9.10 for system schedulecontinuation
(Pzr = Pressurizer)
Pzr 2RV-8010A, Inlet(2-7-17) 1 1.4-19]
Pzr 2RV-8010B, Inlet(2-7-19) [1.4-20]
Pzr 2RV-8010C, Inlet(2-7-18) L1.4-21]
Pzr Power RV, Inlet(2-7-20 E1.4-22]
Weld No.'s 8
~a-2S6-729-6SPL
WIB-423SE2S6-728-6SPL
WIB-359SE2S6-727-6SPL
WIB-380SE2S6-730-6SPL
PTUT
PTUT
PTUT
PTUT
(Linear)2 1
II
2 I II
2 1II
21l'60'60'60'60'ne
One
Two
Two
17 (Upper Head)
33
50
66
Pzr Spray Line(2-7-24) [1.4-26]
Pzr Surge Line(P445893) [1.4-5]
W IB-345SE2S6-15-4SPL
WIB-439SE2*16-14SPL
PTUT
PTUT
14 II
44"
360'60'hree83
Three 100 (Lower Head)
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R T : Pi sn S.E. e sTABLE: . 1.PAGE 4 of 57
CATEGORY
ITEM COMPONENT OR SYSTEM
GENERALIDENTIFICATION
NDEMETH
TOTAL EXAMINATIONITEMS AMOUNT & EXTENT
EXAM'N X TOPERIOD DATE
EXAM RELIEF'S5 REMARKS
B-F Pi in - Safe Endscont steam eneratorB5.3
Note B9.10 forcontinuationWelds No.'s
system schedule
g)Q; Stainless steel pipingis welded directly to Nozzle
Exam area meetsor exceeds req'tsof fig. IWB-2500-8
Welds are thesame as Cat'yB-F, B5.30Tab 1.3
Steam Generator 2-1Reactor oo ant utLoop 1 (RC2-1) [1.4-1]
Reactor Coolant PpSuet Loop 1 (RC2-1)[1.4-1]
Steam Generator 2-2eactor Coo ant ut
Loop 2 (RC2-2) [1.4-2]
Reactor Coolant PpSuet Loop 2 (RC2-2)[1.4-2]
W IB-RC-1-5SE2*1-29SPL
WIB-RC-1-6SE2*5-31SPL
WI8-RC-2-5SE2*2-29SPL
WI8-RC-2-6SE2*6-31SPL
PTUT
PTUT
PTUT
PTUT
(8) (Linear)
92 II
98 ll
92"
98"
360'60o
360'60'ne
One
Two
Two
13
25
38
50
Channel Head
Inlet
Outlet
Inlet
Outlet
Steam Generator 2-3eactor oo ant ut
Loop 3 (RC2-3) [1.4-3]
Reactor Coolant PpSuet Loop 3 (RC2-3)[1.4-3]
Steam Generator 2-4Reactor Coolant OutLoop 4 (RC2-4) [1.4-4]
WIB-RC-3-5SE2*3-29SPL
WIB-RC-3-6SE2*7-31SPL
W IB-RC-4-5SE2*4-29SPL
PTUT
PTUT
PTUT
92 II
98 II
92I'60o360'60o
Three 63
Three 75
Three 88
Inlet
Outlet
Inlet
PGandE
EN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON PONER PLANT-UNIT 2
M J R TEM: Pi in S.E. WeldsTABLE: 1.PAGE 5 o
ITEM COMPONENT OR SYSTEMN L - NDE
IDENTIFICATION METHL
ITEMS AMOuNT 5 EXTENT PERIOD DATE 8I REMARKS
8-F85.50 I
Piping-Safe ends, Cont'dSteam Generators (5.30
Reactor Coolant PpSuet Loop 4 (RC2-4)E1.4-4]
Weld No.l~ineee'o.
WIB-RC-4-6SE2*8-31SPL
PTUT
9Q I I 360 Three 100 Outlet
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
R
TABLE:PAGE
'o 57
DIABLO CANYON POWER PLANT-UNIT 2
ln 0 tin
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH ITEMS AMOUNT 81 EXTENT PERIOD DATE 5 REMARKS
B-G-1
B-G-2B7.50
~Pi in - cont'd
Pressure RetainingBolting (Larger than2 in. dia.)
Pressure RetainingBolting (2 in. dia. 8
Less)3 Inch Diameter Pi e
Loop 1 Hot Leg RTD
Conn (2-7-13) i1.4-27]
Loop 2 Hot Leg RTDConn (2-7-25) Ll.4-28]
Loop 3 Hot Leg RTDConn (2-7-15) L1.4-29]
Loop 4 Hot Leg RTD
Cohn (2-7-16) [1.4-30]
-Remarks-
Line No.5 Flan e No.
2S6-1141-3SPL2-FE-499A
2S6-1147-3SPL2-FE-499B
2S6-1153-3SPL2-FE-499C
2S6-1158-3SPL2-FE-499D
YT-1
YT-1
YT-1
YT-1
816
816
816
816
8 Studs16 Nuts
lOOX One
100K8 Studs16 Nuts
8 Studs 100K16 Nuts
8 Studs 100K16 Nuts
Two
Three
Three
~Flan e ~Bo1 tinPercentage bySystem Amount
25
50
75
100
: B-G-1 ItemsnotApplicable
FE=FlowElement
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
JOR ITEM: Pi in Boltin B-GTABLE: 1.PAGE 7 of 57
CATEG RY
ITEM COMPONENT OR SYSTEMGENERAL NDE
I0ENTI FICATION METH
TOT LITEMS
E INATI N
AMOUNT 8t EXTENTEXAM N TOPERIOD DATE
E RELIEF S
5 REMARKS
B-G-2B7.50
Pi in -Cont'd~Bo tin -Cont'd
2 Inch Diameter Pi e
Loop 1 Cold Leg RTD Con(7-441) [1.4-55]
Loop 2 Cold Leg RTD Con(7-452) [1.4-56]
Loop 3 Cold Leg RTD Con(7-447) [1.4-57]
Loop 4 Cold Leg RTD Con(7-446) [1.4-58]
1.5 Inch Diameter Pi e
Line No.E~EF N .
2S6-1140-2SPL-Remarks-
2S6-1146-2SPL-Remarks
2S6-1152-2SPL-Remarks-
2S6-1159-2SPL-Remarks-
After 2x1.5 Re
VT-1
VT-1
VT-1
VT-1
816
816
816
816
8 Studs 100K16 Nuts
8 Studs 100K16 Nuts
8 Studs 100K16 Nuts
8 Studs 100K.16 Nuts
One
Two 50
Three 75
Three 100
Flange BetweenWelds Number
WIB-981/WIB-982
WIB-1003/WIB-1004
WIB-1022/WIB-1023
WIB-1035/WIB-1036
Reac Cool Pp 1 Seal WtrIn(8-599) [1.4-40]
Reac Cool Pp 2 Seal WtrIn (8-602) [1.4-41]
2S6-54-1.5-Remarks-
2S6-5398-1.5*Two Flanges-Remarks-
VT-1
VT-1 48
8
4 Studs 100K8 Nuts
4 Studs 100K8 Nuts4 Studs8 Nuts
One
Two
20
60
WIB-842/WI8-843
Two FlangesWIB-857/WIB-858WIB-858S/WI 8-858T*Formerly Line 2-55
Reac Cool Pp 3 Seal WtrIn (8-597) [1.4-42]
Reac Cool Pp 4 Seal WtrIn (8-598) [1.4-43]
2S6-56-1.5-Remarks-
2S6-57-1.5-Remarks-
VT-1
VT-1
4 Studs lOOX8 Nuts
4 Studs 100K8 Nuts
Three 80
Three 100
WIB-869/WI8-870
WIB-882/WI8-883
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
J R-
TABLE'AGE
I
DIABLO CANYON POWER PLANT-UNIT 2
n o tan B-G
8 .of 5
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH ITEMS AMOUNT & EXTENT PERIOD DATES
& REMARKS
B-G-2B7.50
Pi in -Cont'd~Bo tin -Cont'd
1.5 Inch Diameter Pi e
Boron Inj Tk OutLoop 1 C.L. (9-436)[1.4-59]
Boron Inj Tk OutLoop 2 C.L. (9-431)[1.4-61]
Line No.~~&II .
2S6-1991-1.52-FE-924
2S6-1992-1.52-FE-925
VT-1
VT-1
- 4 Studs 100K8 Nuts
4 Studs 100K8 Nuts
One
Two
25
50
Flange betweenweld numbers:
WIB555/WIB556
W I8611/WI 8 612
Boron Inj Tk OutLoop 3 C.L. (9-437)[1.4-63]
Boron Inj Tk OutLoop 4 C.L. (9-439)[1.4-65]
2S6-1993-1.52-FE-926
2S6-1994-1.52-FE-927
VT-1
VT-1
48
4 Studs 100%8 Nuts
4 Studs lOOX8 Nuts
Three 75
Thr ee 100
W IB695/WI8696
WIB763/WIB764
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R ITEM: Pi in We ds 8-JTABLE: 1.PAGE 9 o
C G R
ITEM COMPONENT OR SYSTEM'NE LIDENTIFICATION
ND
METH
T L IN I N
ITEMS AMOUNT 5 EXTENTE R L S
PERIOD DATE 8 REMARKS
B-J
B9.12
Pressure Retainine s sn i snB .1 om>na Pipe
size 4 in. and Greater
B-J Items are ident-ified by SystemUnder ApplicableCode Item"
Lon itudinal Welds
Longitudinal wel dsare scheduled togetherwith the intersectingcircumferential welds.See B9.11 items.
Exam'n area meetsor exceeds req'tsof figureIWB-2500-8
*Schedule in: accordance withpage (i)discussion,this tab section-
Longitudinalseam weldscomposite 60ÃSee B9.11
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
COMPONENT OR SYSTEM
PIPING-Continuedp). T67Mul ti pie StreamSystems
C-FC5.11
Residual Ht Rem Pp 2-1Suction (2-10-9,10)
Residual Ht Rem Pp 2-2Suction (2-10-10,8)
C5.11 Residual Ht Rem Pp 2-1Disch (10-2)
Residual Ht Rem Pp 2-2Disch (10-2)
Residual Ht Exchanger2-1 Outlet (2-10-5,16)(Hx to Line 2-2458)
C5.11
Residual Ht Exchanger2-2 Outlet (2-10-12,6)(Hx to Line 2-1669)
IDENTIFICATION
Butt Welds
Cate or C-F
2S1-110-14III[2.2-25]
2S1-111-14IIIP[2.2-6]
2S1-112-8III[2.2-8]
2S1-113-8III[2.2-9]
2S1-118-8III[2.2-26]
2S1-119-8III[2.2-27]
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING-CIRCUM. WELDS C-FTABLE: .2PAGE 1 o
YR TODATE
& REMARKSPERIOD10 YR
METH ITEMS RE UIRED AMOUNT
40 YR YR
Of One Stream(100K) Typical
2(1)(1)
Line 110chosen asTypical.
1325
PT OneTwo
16 16
Line 112chosen asTypical.
(100K)061325
4(1)1)
(2)
PT OneTwoThree
16 16
(100K)
3(1)(1)(1)
Line 118chosen asTypical.
091827
OneTwoThree
PT ll ll
See CategoryC-G, page 14of 30 forbalance oflines 118and 119.
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi in Welds B-JTABLE: 1.PAGE ll o
TGRITEM COMPONENT OR SYSTEM
GENE LIDENTIFICATION
NDE
METHTOT L E IN TI N
ITEMS AMOUNT & EXTENTN
PERIOD DATER LIEF S
& REMARKS
B-J89.1119.12
~Pi ~in -Cont'dCsrc. and Long'1 Welds31 In. Nom. Dia. Cont'deactor oo ant Pp
Suet Loop 3 (RC2-3)
Line No. &T550G
2*7-31SPL[1.4-3]
PT.-UT
1 Weld 360'hree 21 WIB-RC-3-11and one foot ofupper & lowerseams
Reactor Coolant PpSuet Loop 4 (RC2-4)
B9.11 Circumferential welds29 Inch Nom. Diametereactor oo ant ut
Loop 1 {RC2-1)
Reactor Coolant OutLoop 2 (RC2-2)
Reactor Coolant OutLoop 3 (RC2-3)
2*8-31SPL[1.4-4]
Line No. &~IS Dw . Nn.
[1.4-1]
2*2-29 SPL[1.4-2]
2*3-29 SPL[1.4-3]
PTUT
PTUT
1 Weld
360'12)
{1) Sch'd*
1 Weld
Three
Two
25
17
WIB-RC-4-11and one foot ofupper & lowerseams
*29" dia. weldsare not consi-dered to behighest stressloaded
WIB-RC-2-4
T=2.335
PGandE
EN YEAR EXAHINATION PROGRAH
SHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R TEH: Pi in We ds B-JTABLE: 1.PAGE 1 o 7
ITEH COMPONENT OR SYSTEHGEN R L
I0ENTIFICATION HETHL N
ITEHS AHOUNT & EXTENT PERIOD DATE 5 REMARKS
B-J Pi in -Circ' Cont'd8 .1 ) (4 In. 8 greater)
89.11 Circumferential Welds9 nc om. diameter
Reactor Coolant Out-Loop 4 (RC2-4)
B9.11 Circumferential Welds.5 inc Nom. Diameter
Reactor Coolant PumpDisch Loop 1 (RC2-1)
Reactor Coolant PumpDisch Loop 2 (RC2-2)
Line No. 8
T550. I:2*4-29 SPL[1.4-.4]
2*9-27.5SPL[1.4-1]
2*10-27. 5SPL[1.4-2]
PTUT
PTUT
(12) (1) Sch'd*
(16) (5) Sch'd
4 1 Meld 360'
2 Welds360'ne
Two 13
*29 inch dia.welds are notconsidered to behighest stressloaded.
RC Pipe Composit25 percent.
T=2.215
MIB-RC-1-12
MIB-RC-2-12MIB-RC-2-15
Reactor Coolant PumpDisch Loop 3 (RC2-3)
Reactor Coolant PumpDisch Loop 4 (RC2-4)
2*11-27.5SPL[1.4-3]
2*12-27.5SPL[1.4-4]
PTUT
PTUT
4 1 Weld 360'
1 Meld
360'hreeThree
18 WIB-RC-3-12
'25 MIB-RC-4-12
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R ITEM: Pi in We ds B-JTABLE: 1.PAGE 1 o
C EG RY
ITEM COMPONENT OR SYSTEM
GEN LIDENTIFICATION
D
METHT L
ITEMSN N
AMOUNT 8 EXTENT PERIOD DATER
5 REMARKS
B-J Piping-Circ'1 Cont'd(B9.10) (4 In 5 Greater)
Specific weld .identification number will belisted on -ISI Exam. Schedules to be issued priorto each Refueling Outage '
TO DATE foreach pipesystem
B9.11 Circumferential Weldsnc om. diameter
Pressurizer Surge Line(P445893)
Hot Leg Recirc Before2V-8702 (2-10-21,22)
Line No. 8
lEtllRf%.2*16-14SPL[1.4-5]
2S6-109-14SPL[1.4-10]
PTUT
PTUT
(28)
12
(7) Sch'd
1 Weld 360'Weld
1 Weld 360'Welds
OneTWO
OneTWO
1122
825
14 In. CompositePercent (25)
Loop 4 Hot Leg Before2Y-8701 (2-10-21,22)
2S6-1665-14SPL PT
[1.4-10] UT2 Welds 360'hree 28
B9. 11 Circumferential Wel dsnc om. diameter
Accumulator InjectionLoop 1 (2-9-11)
Accumulator InjectionLoop 2 (2-9-12)
2S6-253-10SPL[1.4-e]
2S6-254-10SPL[1.4-7]
PTUT
PTUT
(3e)
10
10
9 Sch'd
1 Weld 360'Weld
1 Weld 360'Weld
OneTWO
OneTWO
1020
1020
10 In. CompositePercent (25)
PGandE
TEN YEAR EXAMINATION PROGRAMASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
M J R ITEM: PIPING-CIRCUM. WELDS C-FTABLE: 2. 2PAGE 0
I EM COMPONENT OR SYSTEM IDENTIF ICATIONN
METHL
ITEMSN
RE UIRED AMOUNT40 YR 10 YR
PERIOD10 YR
YR TODATE
L5 REMARKS
C-FC5.11
PIPING - Continued~C5.1 )Multiple Streams, Cont.
RHR Sup To SprayHdrs 1 8 3 (2-10-17)
RHR Sup To SprayHdrs 2 & 4 (2-10-11)
Butt Weldst «-G2S1-279-8III[2.2-29]
2S1-280-8III[2.2-11]
PT One
(50')
13
(50K)
Line 2-279chosen astypical
C5.11 Residual Heat Exch'r 2Sl-118-8III1 Outlet (2-10-5,16) [2.2-26](Line 2-2458 to 2V-8809A)
Residual Heat Exch'r 2S1-119-8II I2 Outlet (2-10-12,6) [2.2-27](Line 2-1669 to 2V-8809B)
PT Line 2-118chosen astypicalSee categoryC-F, pg. 10of 30 forbalance oflines 2-118 8
2-119
5.11 Safety Inj Pump Suc.Pump 2-1 (2-9-2,6)
Safety Inj Pump Suc.Pump 2-2 (2-9-1,5)
2S2-1982-6[2.2-16]
2S2-1983-6[2.2-12]
PT 10 Two(50')
17 Line 2-1982chosen astypical
END OF ITEM C5.11
PGandE
TEN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi in Welds B-JTABLE: 1.PAGE 15 of 57
CATEGORY
ITEM COMPONENT OR SYSTEMGENERAL
IDENTIFICATIONNDE
METHTOTALITEMS
EX INATI N
AMOUNT 5 EXTENTEXMNPERIOD
EXAM RELIEF SDATE 5 REMARKS
B-J
B9.11
Pi in - circ'1 Cont'dB9.10) (4 In. 8 Greater
Circumferential WeldsInch Nom. Diameter
Line No. 8
ISI DWG No. (3) Sch'd8 In. CompositePercent (27)
B9.11
SIS to RCS Loop 1 HotLeg (2-9-31A/449)
SIS to RCS Loop 2 HotLeg (2-9-31B/450)
Circumferential Wel ds6 Inch Nom. Diameter
Safety Inj. Loop 1
Hot Leg (2-9-31A/449)
Safety Inj Loop 2Hot Leg (2-9-31B/450) .
Safety Inj Loop 3Hot Leg (2-9-35)
Safety Inj Loop 4Hot Leg (2-9-36)
2S6-2575-8[1.4-113
2S6-2576-8[1.4-123
2S6-235-2SPL+[1.4-111
2S6-236-6SPL+[1.4-12]
2S-237-6 SPL+[1.4-131
2S6-238-6SPL[1.4-14]
PTUT
PT'T
PTUT
PTUT
PTUT
PTUT
(114)
10
12
1 Weld 360'
Weld 360'Weld
(29) Sch'd
1 Weld 360'Weld
1 Weld
1 Weld 360'Weld
1 Weld
1 Weld 360'Weld
1 Weld 360'
Weld
One
TwoThree
OneTwoThree
OneTwoThree
OneTwo
One
Three
20
~W
1733
102030
81725
918
13
25
6 In. CompositePercent (25)
SI (to) 2*1-29SPL
SI(to)2*2-29SPL
SI(to)2*3-29SPL
SI(to) RHR
2S6-109-14SPL
PGandE
EN YEAR EXAMINATION PROGRAM
SHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT
MAJOR ITEM: Pi in Melds 8-JTABLE: 1.4PAGE 16 of 57
CTGRYITEM COMPONENT OR SYSTEM
GENRL NE,IDENTIFICATION METH
TTLITEHS
E HIN N
AMOUNT & EXTENTAH N
PERIOD DATEHRLI FS
& REMARKS
B-J .
B9.11
Pi in -Circ'1 Cont'dB9.10) (4 In/&Greater)
6 In. nom. Diameter,Cont d
RHR Pp 2-1 Inj ColdLeg I (2-9-33/412)
RHR Pp 2-1 Inj ColdLeg 2(2-9-32/413)
RHR Pp 2-2 Inj ColdLeg 3 (2-9-34/446)
Line Nn. &
T55BIIB. N:
2S6-3844-6SPL[1.4-151
2S6-3845-6SPLE1.4-16]
2S6-3846-6SPLE1.4-171
PTUT
PTUT
PTUT
10
I Weld 360'Meld
I Meld 360'Weld
I Weld
I Mel d 360'Weld
TwoThree
OneTwoThree
OneTwo
1325
102030
13g5
RHR Pp 2-2 Inj ColdLeg 4 (2-9-21/34)
Pressurizer Inlet2RV-8010A (2-7-17)
Pressurizer Inlet2RV-8010B (2-7-19)
Pressurizer Inlet2RV-8010C (2-718)
2S6-3847-6SPLEI.4-181
2S6-729-6SPL+EI.4-191
2S6-728-6SPL+EI.4-20]
2S6-727-6SPLE1.4-21j
PTUT
PTUT
PTUT
PTUT
12 I Meld 360'Meld
I Meld
I Weld 360'Weld
I Weld 360'Meld
I We 1 d 360'Meld
OneTwoThree
OneTwo
OneTwn
OneTwo
81725
1325
1325
1325
PGandE
EN YEAR EXAHINATION PROGRAHSHE SECTION XI SYSTEHS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEH: Pi in Welds B-JTABLE: 1.4PAGE 1 o
CATEG RY
ITEH COMPONENT OR SYSTEHGENERAL NDE
IDENTIFICATION HETHTOTALITEHS
EXAHI NATION
AHOUNT 8 EXTENTEX N
PERIODX TO EX RELIEF S
DATE 5 REHARKS
B-J
B9.11
Pi in -Circ'1 cont'dB9.10) (4 In. 5 Greater
6 in. Nom. Dia. Cont'd
Pressurizer Power R.V.(2-7-20)
Circumferential Wel ds4 Inch Nom. Diameter
Pressurizer RV2PCV-455C (Inlet)(2-7-20
Line No. 5ISI DWG No.
S6-730-6SPL[1.4-22]
2S6-4081-4SPL[1.4-22]
PTUT
PTUT
(BS)
1 Weld 360'Meld
1 Meld
(21) Sch'd
1 Weld
360'ne
TwoThree
One
91827
25
4 In. CompositePercent (25)
Loop 1 Spray Line(2-7-12,10)
Loop 2 Spray Line(2-7-10,11)
Pressurizer Spray Line(2-7-24)
2S6-13-4SPL[1.4-231[1.4-24]
2S6-14-4SPL[1.4-24][1.4-25]
2S6-15-4SPL[1.4-26]
PTUT
PTUT
PTUT
27
25
27
2 Welds 360'Melds
3 Melds
2 Mel ds 360'Melds
. 2 Welds
2 Welds 360'Melds
3 Melds
OneTwoThree
OneTwoThree
OneTwoThree
71526
81624
71526
Spray to Pzrvia 2S6-15-4From 2*9-27.5Loop 1
Spray to PzrVia-2S6-15-4From *10-27.5Loop 2
Spray to PzrFrom 2S6-13-4And 2S6-14-4
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi in Welds B-JTABLE: 1.4PAGE 18 of 5
C GRYITEM COMPONENT OR SYSTEM
G NER L NDE
IDENTIFICATION thETHT TALITEMS
EX MIN TI N
AMOUNT 5 EXTENTXMN
PERIODEX M RELIEF S
DATE 8 REMARKS
9.21
Pi in -Circ'1 Cont'd89.20) Less Than 4
In. Dia.
Circumferential Welds3 Inch Nom Diameter
Loop 1 Hot Leg RTD
Conn {2-7-13)
Loop I Cold LegRTD Conn {2-7-13)
Loop I RTD ManifoldRet Hdr (2-7-13)
Loop 2 Hot Leg RTDConn (2-7-25)
Loop 2 Cold Leg RTDConn (2-7-25)
Loop 2 RTD ManifoldRet Hdr (2-7-25)
Line No. 5ISI DWG. No.
2S6-3488-3SPL[1.4-27]
2S6-3798-3SPL[1.4-27]
2S6-1141-3SPL[1.4-27]
S6-3489-3SPL[1.4-28]
2S6-3799-3SPL[1.4-28]
2S6-1147-3SPL[1.4-281
PT
PT
PT
PT
PT
PT
(170)
13
Exam'n area meetsor exceeds req'tsFigure IWB-2500-8
(43) Sch'd
I Weld 360'Weld
I Weld 360'Weld
I Weld
I Weld 360'Weld
I Wel d 360'
Weld
TwoThree
OneTwoThree
TwoThree
One
Three
1733
81523
1325
ll22
3 In. CompositePercent (25)
QV2-8073ATo Junction2S6-1141-3SPL
QV2-8075ATo Junction2S6-1141-3SPL
To CrossoverFrom Junction2-3488/2-3798
QV-8073BTo Junction2S6-1147-3SPL
QV2-8075BTo Junction2S6-1147-3SPL
To CrossoverFrom Junction2-3489/2-3799
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
M J R ITEM: Pi in We s B-JTABLE: 1.PAGE 1 o
C R
ITEM COMPONENT OR SYSTEMNE L ND
IDENTIFICATION METHL
ITEMSN N
AMOUNT 5 EXTENTN
PERIODL S
DATE 5 REMARKS
B-J
B9.21
Pi in -Circ'l Cont'dB9. 0) (Less Than 4)
Inch Diameter)3 Inch Nom. Diameter-Cont d
Loop 3 Hot Leg RTDConn (2-7-15)
Line No. 8
2S6-3495-3SPL[1.4-29]
PT 1 Weld 360'Weld
1 Weld
OneTwoThree
91827
QV2-8073CTo Junction2S6-1153-3SPL
Loop 3 Cold Leg RTDConn (2-7-15)
2S6-3800-3SPL[1.4-29]
PT 1 Weld 360'ne 33 . QV2-8075CTo Junction2S6-1153-3SPL
Loop 3 RTD ManifoldRet Hdr (2-7-15)
Loop 4 Hot Leg RTDConn (2-7-16)
Loop 4 Cold Leg RTD
Conn (2-7-16)
Loop 4 RTD ManifoldRet Hdr (2-7-16)
Charging Line Loop 4(2-8-64)
2S6-1153-3SPL[1.4-29]
2S6-3496-3SPL[1.4-30]
2S6-3801-3SPL[1.4-30]
2S6-1158-3SPL[1.4-30]
2S6-246-3SPL[1.4-31]
PT
PT
PT
PT
PT
12
15
1 Weld 360'Weld
2 Welds
1 Weld 360'Weld
1 Weld 360'
Weld 360'Weld
2 Welds
1 Weld 360'
Weld
OneTwoThree
OneTwo
Two
OneTwoThree
One
Three
71429
1429
50
71327
141429
To CrossoverFrom Junction2-3495/2-3800
QV2-8073DTo Junction2S6-1158-3SPL
QV2-8075DTo Junction2S6-1158-3SPL
To CrossoverFrom Junction2-3496/2-3801
CVCS NormalCharging
~ I r I ~ I ~ ~ ~
I I ~
~ ~ r ~ I ~ ~ I ~ r
I I
' t' '~
II I' ~
~ ~
I I
'
~
I I
~ I
ol r ~ ~
~ I I I I ~
~ ~
I I o
~ ~
ol
~~ o
~ I
~ ~
I I 'I ~ I
r ~
ol~
~
o' I I I I I I
I r ~ I
I ~
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR TEM: Pi in Welds 8-JTABLE: l.PAGE 21 o 5
C EGRITEM COMPONENT OR SYSTEM
GNRLIDENTIFICATION METH
T L E IITEMS AMOUNT 5 EXTENT PERIOD DATE
E R L8 REMARKS
B-J Pressure Retainine s n ssnB9.2 Less an 4
Inch Diameter)
B9.22 Lon itudinal Welds -Remarks- B9.22 NotApplicableThere areno seamedpipes or fittings
Note: 2 Inchone fittingsare forged type304 Stainless
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR T M: Pi in Welds B-JTABLE:
'PAGE 2 o
ITEM COMPONENT OR SYSTEMNRL
IDENTIFICATION METH
T TITEMS
INAMOUNT 5 EXTENT PERIOD DATE 5 REMARKS
B-J
~
~Pi in - Cont'd
B9.3 ) Branch Pi eConnection e s
o umetnc xam n toextent possible complieswith the basic require-ments of Appendix IIIand Supplement 7
o e figure - - ssessentially the weld (Branch)design for all sy'stems identi-fied under this Code Category
'ub-Item (1)
(1)Reference:
WNES SPECG676343
B9.31
B9.31
Nominal Pipe SizeGreater Than 2 In.
14 Inch Nom. Diameter
Pressurizer Surge Line(RC2-2) (P445893)[1.4-2] [1.4-5]
Hot Leg Recirc BeforeV-8702 (RC2-4)(2-10-21,22)[1.4-10] [1.4-4]
10 Inch Nom. Diameter
Line No. 8
d'*16-14SPL
WIB-432
2S6-109-14SPLWIB-243
PTUT
PTUT
(2)*
(4)
(1) Sch'd*
1 Branch 360'wo
(1) Sch'd
* 14 in. Compositepercent (50)
50
10 In. CompositePercent (25)
Accumulator InjectionLoop 1 (2-9-11)[1 4-1] [1 4-6]
Accumulator InjectionLoop 2 (2-9-12)[1.4-2] [1.4-7]
Accumulator InjectionLoop 3 (2-9-13)[1.4-3] [1.4-81Accumulator InjectionLoop 4 (2-9-14)[1.4-4] [1.4-9]
2S6-253-10SPLWIB-37
2S6-254-10SPLWIB-163
2S6-255-10SPLWIB-192
2S6-256-10SPL.WIB-289
PTUT
PTUT
PTUT
PTUT
360'ne 25
25
25
25
*Choice oflisted weldswill be made toequal scheduledpercentage foreach sizethroughout
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R TE : in e s B-JTABLE: l.PAGE 2 o 5
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH ITEMS AMOUNT Ec EXTENT PERIOD DATE 5 REMARKS
B-J
B9.31
89.31
Pi in -Cont'dB . ) (Branch Welds
Greater Than 2 InchDiameter)
6 Inch Nom. Diameter
Safety Inj. Loop 1
Hot Leg (2-9-31A,449)[1.4-1] [1.4-11]
Safety Inj Loop 2 HotLeg (2-9-31B,450)[1.4-2] [1.4-121
Safety Inj. Loop 3Hot Leg (2-9-35)[1.4-3] [1.4-13]
4 Inch Nom. Diameter
Loop 1 Spray Line(2-7-12)[1.4-1] [1..4-23]
Loop 2 Spray Line(2-7-11) [1.4-2][1.4-25]
Line No. 5d
2S6-235-6SPLWIB-1
2S6-236-6SPLWIB-105
2S6-237-6SPLWIB-232
2S6-13-4SPLWIB-55
2S6-14-4SPLWIB-104
PTUT
PTUT
PTUT
PTUT
PTUT
(3) (1) Sch'd
1 Branch
360'2)
(1) Sch'd
1 Branch
360'WO
One
33
33
50
50
6 In. CompositePercent (33)
Note: Loop 4Tng to RHR
14X14X6" Tee
4 In. CompositePercent (50)
PGandE
TEN YEAR EXAMINATION PROGRAMASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
RI M: Ps in e s 8-JTABLE:PAGE 2 o
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH ~ ITEMS AMOUNT 5 EXTENT PERIOD DATE 8 REMARKS
B-J
B9.31
Pi in -cont'd9. 0)(Branch Welds
Greater than 2 InchDiameter)
3 Inch Nom. Diameter*
Loop 1 RTD ManifoldRet Hdr (2-7-13)[1.4-27] [1.4-1]
Loop 2 RTD ManifoldRet Hdr (2-7-25)[1.4-2] [1.4-28]
Loop 3 RTD ManifoldRet Hdr (2-7-15)[1.4-3] [1.4-29]
Line No. 5d
2S6-1141-3SPLWIB-17
2S6-1147-3SPLWIB-123
2S6-1153-3SPLWIB-204
PT
PT
PT
(7) (2) Sch'd
1 Branch 360'wo 14
3 In. CompositePercent (29)
*See page i discus-sion, this tabsection for expla-nation of examina-tion requirements.
Loop 4 RTD ManifoldRet Hdr (2-7-16)[1.4-4] [1.4-30]
Charging Line Loop 4(2-8-64) [1.4-4][1.4-31]
Charging Line Loop 3(2-8-64) [1.4-3][1.4-31]
Letdown Line Loop 2(2-7-8) [1.4-2][1.4-33]
2S6-1158-3SPLWIB-268
2S6-246-3SPLWI8-310
2S6-50-3SPLWIB-183
2S6-24-3SPLWIB-142
PT
PT
PT
PT 1 Branch 360'hree 29
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: Pi in Welds B-JTABLE: 1.PAGE 25 of 57
C T G RY
ITEM COMPONENT OR SYSTEMGNRL N
IDENTIFICATION METHT TALITEMS
EX IN T N
AMOUNT & EXTENTXMN T
PERIOD DATEEX MR LIEF S& REMARKS
B-J
B9.32
'i in -Cont'sB . ) Branch Meld
2 Inch & less (Dia-meter)
2 Inch Nom. DiameterLoop 1 Co LegDrain RCOT (7-434)[1.4-11 [1.4-44] .
Line No. &Sean cCtWedASS=%8 YSFL+WIB-500
PT(13)
1(4) Sch'd1 Branch 360'ne
Code figure IWB2500-10 is-essentially the weld (branch)Idesign for all systems identi-fied under this code categorysub-item (1)
(1)Reference:MNES SPEC6676343
2 In. CompositePercent:30
Loop 3 Cold LegDrain RCDT (7-424)[1.4-3] [1.4-46]
Loop 4 Cold LegDrain RCDT (7-419)[1.4-4] [1.4-47]
SI Pp 2-1 Inj Hot LegLoop 1 2-9-31A.449)[1.4-11.
SI Pp 2-1 Inj Hot LegLoop 2 2-9-31B,450)[1.4-12
Loop 1 Cold Leg RTDConn (7-441)[1.4-1] [1.4-55]
Loop 2 Cold Leg RTD
Conn (7-452)[1.4-2] [1.4-56]
2$ 6-960-2SPL+WIB-649
2S6-961-2SPL+WI8-722
2S6-3863-2MIB-913
2S6-3864-2'MIB-919
2S6-1140-2SPLMIB-971
2S6-.1146-2SPLWIB-991
PT
PT
PT
PT
PT
1 Branch 36D'wo
1 Branch 360'hree
1 Branch 360'wo
15
23
23
Note: Loop 2Drain is fromletdown line,no branch conn.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
M JOR ITEM: Pi in Welds B-JTABLE:PAGE 2 o
TGRITEM COMPONENT OR SYSTEM
GNERLIDENTIFICATION METH
LITEMS
E I N
AMOUNT & EXTENTEX RLE
PERIOD DATE 5 REMARKS
B-J
B9.32
Piping-Cont'd(B9.30) Branch Weld2 Inch 5 Less (Diameter)2 Inch Nom. Dia. (Cont'd)
Loop 3 Cold Leg RTD
Conn (7-447)[1.4-3] [1.4-57]
Loop 4 Cold Leg RTD
Conn (7-446)[1.4-4] [1.4-58]
Line No. 5'BBTd2S6-1152-2SPLWIB-1012
2S6-1159-2SPLWIB-1026
PT
PT
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
M J R TEM: Pz in e ds B-JTABLE:PAGE 2 o
ITEM COMPONENT OR SYSTEMG N L
IDENTIFICATION METH.
N
ITEMS AMOUNT 8 EXTENT PERIOD DATE EE REMARKS
B-J
89.32
Pi in - Cont'dB . ) Branch Welds
2 Inch 5 less(Diameter)
2 In. Nom. Diameteront
SI Pps Cold Leg Loop 1
Re circ 2-9-33,412)[1.4-15
SI Pps Col d Leg Loop 2Recirc 2-9-32,413)[1.4-16
SI Pps Cold Leg Loop 3Recirc 2-9-34,446)[1.4-17
SI Pps Cold Leg Loop 4Recirc (9-445)[1.4-5O]
Line No. &
2S6-3855-2SPLWIB-929
2S6-3856-2SPLWIB-935
2S6-3857-2SPLWIB-941
2S6-3858-2SPLWIB-951
PT
PT
PT
PT
89.32 1.5 Inch Nom. Diameteroron ng.. ut. oop
1 Cold Leg (RC2-1)[1.4-1] [1.4-60]Born Inj. Tk. Out. Loop2 Cold Leg (RC2-2)[1.4-2] [1.4-62]Born Inj Tk Out Loop3 Cold Leg (RC2-3)[1.4-3] [1.4-64] .
2S6-1991-1.5SPL PTWIB-507
2S6-1992-1.5SPL PTWIB-560
2S6-1993-1.5SPL PTWIB-654
(4) (1) Sch'd1'.5 In.compositepercent (25)
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi in Welds B-JTABLE: 1.PAGE 2 o
R
ITEM COMPONENT OR SYSTEM IDENTIFICATION. NETH ITEMS AMOUNT 5 EXTENT PERIOD DATE 5 REMARKS
B-J
B9.32
Pi in - Cont'dB .3 ) Branch Welds
2 In 8 Less (Diameter)1.5 In. Nom. Dia.(Con't
Line No. 8
d
Boron Inj Tk Out Loop4 Cold Leg (RC2-4)[1.4-4] [1.4-66]
2S6-1994-1.5SPL PTWIB-732
1 Branch 360'hree 25
PGandE
TEN YEAR EXAHINATION PROGRAH
SHE SECTION XI SYSTEHS-CLASS I
DIABLO CANYON POWER PLANT-UNIT
HAJOR ITEM: Pi in Welds 8-JTABLE: 1.PAGE 29 of 57
CTGRYITEH COMPONENT OR-SYSTEH
GEN RALIDENTIFICATION
ND
HETHT L EX IN NITEHS AHOUNT 5 EXTENT
HPERIOD
X R LIEF S
DATE 5 REHARKS
B-J : Pi in - Socket Welds89,40)
Socket welds areidentified by system.
Specific weld .identificationnumbers will be listed. on ISIexam. schedules to be issuedprior to each refueling outage
Scheduled inaccordance withpage (i)discussion
B-9.40 2 Inch Nom. DiameterLetdown Line Loop(2-7-8)
Line No. 5TET %~a. o.
S6-f 1.4-33]
PT(385) (97) Sch'd
2 1 Socket
360'omp.X(25)One 50 Reducing 3 Inch
Line to 2 inchsockets for2LCV-459 (Valve)
Charging Line AuxSpray (8-554,595,596)
2S6-51»2SPL PT2S6-4532-2SPL PT
$ 1.4-37,38,39]
495
5 Sockets 360'
5
OneTwoThree
91726
Reac Cool Pp 1 SealWtr In (8-599)
Reac Cool Pp 2 SealWtr In (8-602)
Reac Cool Pp 3 SealWtr In (8-597)
Reac Cool Pp 4 SealWtr ln (8-598)
2S6-54-2L1.4-40]
2S6-55-2 and2S6-5398-1.5I.1.4-41]
2S6-56-2 and2S6-56-1.5I 1.4-42]
2S6-57-2 and2S6-(57)-1.5fl.4-43]
PT
PT
PT
PT
15
621
1019
617
1 Socket 360'
1
2 Socket 360'
2
3 Socket 360'
2
2 Socket 360'
2
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
72027
71522
101724
91726
Includes Line2S6-54-1.5 and(1) 89.21 Item
Includes(1) B9.21 Item
Includes(1) B9.21 Item
Includes Line2S6-(57)-1.5 and(1)B9.21 Item
PGandE
TEN YEAR EXAMINATION PROGRAH
ASHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT«UNIT
HAJOR ITEM: Pi in Welds B-JTABLE: 1.PAGE 30 of 57
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH . ITEMS AMOUNT & EXTENT PERIOD DATE & REMARKS
8-J
B9.40
Pi in -Socket Welds89.40) Cont'd
Loop 1 Cold Leg DrainRCOT (7-434)
Loop 2 Cold Leg DrainRCOT (7-436)
Loop 3 Cold Leg DrainRCOT (7-424)
Line No. &
ISI OWG No.
2S6-95B-2SPL+I1.4 44]
, 2S6-959-2SPL+I 1.4-453
2S6-960-2SPL+D.4-461
PT
PT
PT
1 Socket 360'
1 Socket 360'
OneTwo
TwoThree
1733
1429
1 Socket 360'ne 25
Drain OffLetdown Line2S6-24-3
Loop 4 Cold Leg DrainRCDT (7-419)
2S6-961-2SPL+fl.4-47.'t
PT 1 Socket 360' OneTwo
1122
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
TGRYITEM COMPONENT OR SYSTEM
GNE LIDENTIFICATION
N
METH
L IN N
ITEMS AMOUNT 5 EXTENT PERIOD
J R EM: Pi n e s B-TABLE: 1.PAGE 31 of 5
DATEE REL F
5 REMARKS
B-J
B9.40
SI PpsRecirc
Cold Leg Loop 1
(2-9-33,412)
Pi in - Socket Welds) Cont'd
SI Pp 2-1 Inj Hot LegLoop 1 (7-9-31A,449)
SI Pp 2-1 Inj Hot LegLoop 2 (2-9-31B,450)
Safety Inj Hot LegLoop 3 (9-444)
Safety Inj Hot LegLoop 4 (9-442)
Line No. 8
Yrnmrlr .
2S6-3863-2[1.4-11]
2S6-3864-2[1.4-12]
2S6-1976-2[1.4-48]
2S6-1990-2[1.4-49]
2S6-3855-2SPL[1.4-15]-.
PT
PT
PT
PT
PT
1 Socket 60'
Socket 360'
1 Socket 360'
1 Socket 360'
1 Socket
360'wo
OneTwo
OneTwo
One, Two
Three
20
1429
1325
1122
20
SI PpsRecirc
Cold Leg Loop 2(2-9-32,413)
2S6-3856-2SPL[1.4-16]
PT 1 Socket 360'hree 20
SI Pps Cold Leg Loop 3Recirc (2-9-34,446)
SI Pps Cold Leg Loop 4Recirc (9-445)
2S6-3857-2SPL[1.4-17]
2S6-3858-2SPL[1.4-50]
PT
PT
13
15
1 Socket 360'
1
1 Socket 360'
2
OneTwoThree
OneTwoThree
81523
72726
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
MJRTABLE:PAGE
DIABLO CANYON POWER PLANT-UNIT 2
TEM: Pi in We ds B-J1.
3 0
R
ITEM COMPONENT OR SYSTEMG N R
IDENTIFICATION METHT L N
ITEMS AMOUNT & EXTENT
R LPERIOD DATE 5 REMARKS
B-J
B9.40
Pi in -Socket WeldsB . ) Cont'd
Loop 1 Hot Leg RTD ConnHdr (7-422,443)
Line No. 8TIE~ l0.
2S6-1139-2SPL[1.4-51]
PT 19 1 Socket 360'
2
OneTwoThree
51526
Loop 2 Hot Leg RTD ConnHdr (7-423,448)
2S6-1145-2SPL[1.4-52]
PT 19. 1 Socket 360'
2
One 5Two 15Three 26
Loop 3 Hot Leg RTD ConnHdr (7-425,428)
Loop 4 Hot Leg RTD ConnHdr (7-426,427)
Loop 1 Cold Leg RTD Conn(7-441)
Loop 2 Cold Leg RTD Conn(7-452)
Loop 3 Cold-Leg RTD Conn(7-447)
Loop 4 Cold Leg RTD Conn(7-446)
2S6-1151-2SPL[1.4-53]
2S6-1157-2SPL[1.4-54]
2S6-1140-2SPL[1.4-55]
2S6-1146-2SPL[1.4-56]
2S6-1152-2SPL[1.4-57]
2S6-1159-2SPL[1.4-58]
PT,
PT
PT
PT
PT
PT
19
23
13
15
17
17
1 Socket 360'
2
2 Socket 360'
2
1 Socket 360'
1
1 Socket 360'
2
2 Sockets 360'
1
1 Socket 360'
1
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
51526
91726
81523
71327
121824
61824
PGandE
EN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi in Welds B-JTABLE: 1.PAGE 33 of .57
CATEGORY
ITEM
B-J
89.40
COMPONENT OR SYSTEM
Pi in -Sockets Welds.B9. 0) Cont'd
1.5 In. Nom. Diameter
GENERALIDENTIFICATION
Line No. 8
ISI DWG. No.
NDE
METH
TOTALITEMS
(210)
EXAMINATI N
AMOUNT 5 EXTENT
(53) Sch'd
EXAM N
PERIODT EXAM RELIEf S
DATE 5 REMARKS
Comp. Note comenFrom pg. 20
(25) Item B9.21
B.W.=Butt Weld
Boron Inj Tk Out Loop1 Cold Leg(9-436,465)
PT2S6-1991-1.5SPL+[1.4-59] .
[1.4-60]
52 4 Sockets 360'neTwo
5 Three
81525
Includes (3)B9.21 Items-.Butt Welds
Boron Inj Tk Out Loop2 Cold Leg(9-431,466)
2S6-1992-1. 5SPL+[1.4-6ll[1.4-62]
PT ~ 71 6 Sockets 360'
6360'neTwo
Three
91725
Includes (2)B9.21 itemsButt Welds
Boron Inj Tk Out Loop3 Cold Leg(9-437,467)
PT2S6-1993-1.5SPL+[1.4-63][1.4-64]
50 4 Sockets54
OneTwoThree
81826
Includes (3)B9.21 Items
Butt Welds
Boron Inj Tk Out Loop4 Cold Leg (9-439,468)
2S6-1994-1. 5SPL[1.4-65][1.4-66]
PT 38 3 Sockets 360'
3
OneTwoThree
81624
Includes (3)B9.21 items-Butt Welds
PGandE
TEN YEAR EXAHINATION PROGRAHASHE SECTION XI SYSTEHS-CLASS I
DIABLO CANYON POWER PLANT-UNIT
HAJOR ITEH: Pi e Su ortsTABLE: 1.4PAGE ii of 57
Category B-K-1; welded support attachments to the pressure boundary, (Items B 10.10, B 10.20 and B 10.30)
are scheduled for surface examination when the base metal thickness of the welded attachment is 5/8 inch
(.625) and greater (Ref. IWB-2500-1 Footnote 3) Category B-K-2 includes all portions of all supports
including welded support attachments to the pressure boundary regardless of size.
The total amount of B-K-1 applicable attachments to each system/component is noted adjacent to the
line number and scheduled accordingly.
Supports for valves (B10.30 and B 11.30) are scheduled together with the corresponding pipe (B 10.10,
B 11.10) system. Supports for pumps (B 10.20, B 11.20) are scheduled in Table 1.5.
For clarification of the examination area of category B-K-2, see section IMF-1300 of the Minter 1980
Addenda of ASHE Section XI.
"lgTE; Hanger Section totals are not current. This section will be revisedto reflect the updated total after the Reverification Hodificationshave been completed.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R ITEM: Pi e Su orts B-K-1 B-K-2TABLE: 1.4PAGE 3 o 5
T R
ITEM COMPONENT OR SYSTEMG N L NDE
IDENTIFICATION METH
T L XAMIN TI N
ITEMS AMOUNT & EXTENTN
PERIOD DATEE RELIE S
& REMARKS
B-K-1
B10.10B10. 20B10.30
B-K-2
B11.10B11.20B11.30
Inte rail .Weldedttac mentsTo ressure Boundary)
-Piping--Pumps-(See Table 1.5)-Valves-(Remarks)
Su ort Com onents
-Piping-Pumps (See Table 1.5)-Valves-(Remarks)
(Attach't)
(Supports)
Exam'n area meetsor exceeds req'tsof figures IWB-2500-13 and IWB-2500-15
Reference IWF-1300Winter '78 Add.For Clarificationof B-K-2 exam.. area
P
Items B10.30 and B11.3(Valve Supports) areincluded in thissection and scheduledin conjunction withitems B10.10 and ItemB11.10 (Pipe. Supports)
Note Comments onpage ii
Q37E; The total number of supports
29,&27.5 In. Nom. Dia.
Reactor Coolant.OutLoop 1 (RC2-1)
Reactor Coolant OutLoop 2 (RC2-2)
Reactor Coolant OutLoop 3 (RC2-3)
Reactor Coolant OutLoop 4 (RC2-4)
on the line appears in the B-K-2 column
Line No. &
B-K-2
2*1-29SPL[1.4-1]
2*2-29SPL-C1.4-2]
2*3-29SPL[1.4-3]
2*4-29SPL[1.4-4]
B-K-2
PGandE
TEN YEAR EXAMINATION PROGRAMASHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEN: Pi e Su orts B-K-1 B-K-2TABLE: 1.PAGE 3 o
C GRYITEM COMPONENT OR SYSTEM
G N LIDENTIFICATION METH
LITEMS
N
AMOUNT 8 EXTENT PERIOD DATE 8 REMARKS
B-K-1B-K-2
B10.10B11.10
Inte ral 1 Welded Attach.Su ort om onents31 In. Nom. Dia.
Reactor Coo)ant PumpSuction Loop 1
Reactor Coolant PumpSuction Loop 2
Reactor Coolant PumpSuction Loop 3
Line No. 8
ISI DMG No.
2*5-31[1;4-1]
2*6-31[1.4-2]
2*7-31[1.4-3]
VT-3
VT-3
VT-3
B-K-21 Support 100K
B-K-21 Support 100K
B-K-21 Support lOOX
One
One
One
Two
Two
B-K-211
25
37
50
62
Three 75
Reactor Coolant PumpSuction Loop 4
2*8-31[1.4-4] VT-3
B-K-21 Support 100X Three 87
Three 100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R TE : Pi e Su orts B-K-1 B-K-TABLE: 1.4PAGE 36 of 57
CTGRITEM
8-K
B10.10B11. 10
COMPONENT OR SYSTEM
~So orts- Cont'd
Support Attach'tSupport Components
GENER LIDENTIFICATION
NDE
NETHT L
ITEMSE INT N
AMOUNT & EXTENT
B-K-2 requirementsinclude visualexam. (VT-3) ofwelded attachmentsincluded thosein category B-K-1
XAM RLI S
PERIOD DATE & REMARKS
s co umn identsfsessupport 8 when B-K-1exam teq'ts areapplicable
B-K-1 ExamRequirementsApplicable To:
810.10B11.10
14 Inch Nom. Diameter
Pressurizer SurgeLine (P445893)(Loop 2)
Line No. &
ISIIOGI .
2*16-14SPL[1.4-5] VT-3.
(VT-4)
Remarks
B-K-22 Supports lOOX22
OneTwoThree
Note: VT-4 Sche-duled as applicableto individualcomponents
B-K-23366
100
Seismic Constr.Mark Weld
No. No.
Hot Leg Recirc Before2V-8702 (2-10-21,22)
Loop 4 Hot Leg Before2V-8701 (2-10-21,22)
2S6-109-14SPL[1.4-10]
2S6-1665-14SPL[1.4-10]
PT
VT-3(VT-4)
PT
VT-3(VT-4)
B-K-1 100KB-.K-22 Supports 100K22
B-K-1B-K-21 Supports 100K22
One
One =
TwoThree
One
OneTwoThree
B-K-2
66100
B-K-2260
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi e Su orts B-K-1, B-K-2TABLE: 1.4PAGE 3 o 5
CATEG R
ITEM COMPONENT OR SYSTEMGENE L
IDENTIFICATIONND
METHT T L EXAMIN TI N
ITEMS AMOUNT 8 EXTENTEAMN TPERIOD DATE
E RELIEF S
& REMARKS
B-K
B10.10B11.10
B10.10B11.10
~So orts- Coot'd
Support Attach'tSupport Components
10 Inch Nom. Diameter- ccumu ator ngect>onLoop 1 (2-9-11)
Accumulator InjectionLoop 2 (2-9-12)
Line No. 5
ISI DWG.No.-'EZXZPL
[1.4-6]
S6-254-10SPL+[1.4-~]
PTVT-3
(VT-4)
PTVT-3
(VT-4)
B-K-1B-K-22 Supports 100K22
B-K-1B-K-21 Supports lOOX1
1
Two
OneTwoThree
TwoB-K-2OneTwoThree
B-K-2~0
60100
B-K-2.666
100
B-K-1 Examrequirements-A licable toMar eldNo. No.
Accumulator InjectionLoop 3 (2-9-13)
Accumulator InjectionLoop 4 (2-19-14)
256-255-10SPL+[1.4-8]
2S6-256-10SPL+[1,4-9]
PTVT-3
(VT-4)
PTVT-3
(VT-4)
B-K-1B-K-21 Support 100K
B-K-1B-K-22 Supports 100K22
Three
One
Three
OneTwoThree
B-K-2T60
8-K-233,66
100
PGandE
TEN YEAR EXAMINATIONPROGRAM'SME
SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
M J R ITEM: Ps e Su orts B-K-1, B--TABLE:PAGE 3 o 5
ITEM COMPONENT OR SYSTEMN L
IDENTIFICATIONL
ITEMS AMOUNT 5 EXTENT PERIOD DATE 8t REMARKS
B-K
B10.10B11.10
B10.10B11.10
B10.10Bll.10
~So orts — Cont'd
Support Attach'tSupport Components
8 Inch Nom. Diameter
SIS To RCS Loop 1
Hot Leg (2-9-31A,449)
SIS To RCS Loop 2Hot Leg (2-9-318,450)
6 Inch Nom. Diametera ety ng oop
Hot Leg (2-9-31A,449)
Safety Inj Loop 2Hot Leg (2-9-31A,450)
Line No. 8'5I
OIIB
2S6-2575-8[1.4-11]
2S6-2576-8[1.4-12]
2S6-235-6SPL+[1.4-11]
2S6-236-6SPL+[1.4-12]
VT-3 2(VT-4)
VT-3(VT-4)
"VT-3(VT-4)
VT-3(VT-4)
B-K-21 Suppor t 100K
1
B-K-21 Support 100$12
B-K-22 Supports 100Ã22
B-K-22 Supports 100K22
OneTwoThree
OneTWO
Three
OneTwoThree
OneTwoThree
B-K-2~o
50100
B-K-22550
100
B-K-22563
100
B-K-23366
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEN: Pi e Su orts B-K-1 B-K-2TABLE: 1.4PAGE 3 o
C G R
ITEN COMPONENT OR SYSTEM
G N R L NDE'DENTIFICATIONMETH
TL E INT N
ITEMS AMOUNT 8 EXTENTN
PERIOD DATEAHRL S-
8t REMARKS
B-K
B11.10
~Su orts -. Cont'd
Safety Inj Loop 3Hot Leg (2-9-35)
Line No. 8
EEIS 0EG tlF553- iPL
[1.4-13] VT-3(VT-4)
11 B-K-23 Supports 1005 One4 Two4, Three
B-K-2Fr~64
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R TE : Pi e Su orts B-K-1 B-K-2TABLE: 1.PAGE 40 of 57
R.ITEM COMPONENT OR SYSTEM
N
IDENTIFICATION METH ITEMS AMOUNT 8 EXTENT PERIOD DATE 5 REMARKS
B-K
Blo. 10B11.10
~Su orts-Coot'd
Support Attach'tSupport Components
B-K-1 Examrequirementsapplicable to
6 Inch Nom. DiameterCont
Safety Inj Loop 4Hot Leg (2-9-36)
Line No. 8
T550
2S6-238-6SPL+[1.4-14]
PTVT-3
(VT-4)
B-K-1B-K-22 Supports 100K22
One
OneTwoThree
B-K-2
66100
MarkNo.
WeldNo.
B10.10 RHR Pp 2-1 Inj ColdLeg 1 (2-9-33,412)
RHR Pp 2-1 Inj ColdLeg 2 (2-9-32,413)
2S6-3844-.6SPL+ - PT[1.4-15] VT-3
(VT-4)
2S6-3845-6SPL+ PT[1.4-16] VT-3
(VT-4)
110
B-K-1B-K-23 Supports 100K33
B-.K-18-K-23 Supports 100K34
Two
OneTwoThree
Three
OneTwoThree
B-K-23366
100
8-K-23060
100
RHR Pp 2-2 Inj ColdLeg 3 (2-9-34,446)
2S6-3846-6SPL+[1.4-17] VT-3
(VT-4)B-K-23 Supports 100K One3 Two3 Three
8-K-2
66100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi e Su orts 8-K-1 B-K-2TABLE:PAGE 4 o 5
C G R
ITEM
810.10B10. 11
COMPONENT OR SYSTEM
~Su or ts-Cont's
Support Attach'tSupport Components
NRLIDENTIFICATION
Line No. 8
ISI DWG No.
N E
NETHL
ITEMSINT N
AMOUNT 5 EXTENTN REL EF S
PERIOD DATE 5 REMARKS
xamRequirementsApplicable to:Work Weld
No. No.
RHR Pp 2-2 Inj ColdLeg 4 (2-9-21,34)
2S6-3847-6SPL+[1.4-181
PTVT-3VT-4
1
13B-K-1B-K-24 Supports 100K
5
Three
OneTwoThree
B-K-
510
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
R
TABLE:PAGE
DIABLO CANYON POWER PLANT-UNIT 2
Ps e Su orts B-K-1 B-K-
42 of 57
C TEGORY
ITEM
B-K
B10.10B10.11
COMPONENT OR SYSTEM
Supports-Cont'd
Support Attach'tSupport Components
GENER LIDENTIFICATION
NDE
METH
TOT E IN TI N
ITEMS AMOUNT & EXTENTN T
PERIOD DATEE RELIEF S
& REMARKS
Exam
B10.10B10.11
6 Inch Nom. DiameterCon t
Pressurizer 2RV-8010AInlet (2-7-17)
Pressurizer 2RV-8010BInlet (2-7-19)
Pres suri zer 2RV-8010CInl et (2-17-18)
Pressurizer Power RV
Inlet (2-7-20)
LINE NO. &
ISI DWG No.
2S6-729-6SPL+[1.4-19]
2S6-728-6SPL+[1.4-20]
2S6-727-6SPL+[1.4-21]
2S6-730-6SPL[1.4-22]
VT-.3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
2
B-K-21 Support 100K1
B-K-21 Support 100K1
B-K-21 Support 100%1
B-K-21 Support 10051
1
OneTwo
TwoThree
OneThree
OneTwoThree
B-K-250
100
B-K-250
100
B-K-250
100
B-K-23366
100
(Vlv;Bll.30 Item)
(Vlv;B11.30 Item)
(Vlv;B11.30 Item)
PGandE
TEN'EAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi e Su orts B-K-l, B-K-2TABLE: 1.PAGE 4 o
C EGORY
ITEM COMPONENT OR SYSTEM
GENERAL NDE
IDENTIFICATION METH
TOT LITEMS
EXAHIN T ON
AMOUNT 5 EXTENTEXAM N
PERIOD DATEEXAM RELIEF S
5 REMARKS
B-K
B10.10B11.10
Supports - Cont'd
Support Attach'tSupport Components
B-K-1 ExamRequirements
-Applicable to-
810.10B10.11
4 Inch Nom. DiameterCont
Pressurizer RV 2PCV-455CInlet (2-7-20)
Loop 1 Spray Line(2-7-12,10)
Loop 2 Spray Line(2-7-10,11)
Pressurizer Spray Line(2-7-24)
Line No. 8
T5ltWflK
2S6-4081-4SPL[1.4-22]
2S6-13-4SPL
1.4-24
2S6-14-4SPL,[1.4-24][1.4-25]
2S6-15-4SPL[1.4-26]
VT-3(VT-4)
VT-.3
VT-3(VT 4)
-VT-3
20
14
12
B-K-2
~\
1 Support 100K
B-K-26 Supports 100K77
B-K-24 Supports 100K55
B-K-24 Supports 100K
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
8-K-2
100
B-K-2P)68
100
B-K-2F957
100
B-K-2:666
100
MarkNo.
Weld. No.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pz e Su orts B-K-1, B-K-2TABLE: 1.PAGE 4 o
C TEGORITEH COMPONENT OR SYSTEM
GNE LIDENTIFICATION
ND
METH
TOTALITEMS
EXAMINAMOUNT 5 EXTENT
AH N AMRLEPERIOD DATE 5 REMARKS
B-K
B10.10B11.10
B10.10
~Su orts-Cont'd
Support Attach'tSupport Components
3 Inch Nom. Diameter
Loop 1 Hot Leg RTD
Conn (2-7-13)
Loop 1 Cold LegRTD Conn (2-7-13)
Line No. 8
ISI DWG No.
2S6-3488-3SPL'1.4-27j
2S6-3798-3SPL[1.4-27]
PTVT-3
(VT-4)
PTVT-3
(VT-4)
1
3
B-K-1B-K-21 Support1
2
B-K-1'-K-2
1 Support1
1
100K
100K
Three
OneTwoThree
One
OneTwoThree
B-K-1 ExamRequirements
" Applicable to
Hark WeldNo. No.
5-K-22550
100
B-K-2.666
100
Loop 1 RTD ManifoldRet Hdr. (2-7-13)
2S6-1141-3SPL[1.4-27] VT-3
(VT-4)B-K-23 Suppor'ts lOOX One2 Two2 Three
B-K-20
70100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: Pi e Su orts B-K-1 B-K-2TABLE: 1.PAGE 45 of 57
C R
ITEM . COMPONENT OR SYSTEMGEN D
IDENTIFICATION METH
TL E INITEMS AMOUNT & EXTENT PERIOD DATE
L E
& REMARKS
B-K
B10. 10B11.10
B10. 10
~Su orts-Cont'd
Support Attach'tSupport Components
3 Inch Nom. Diametercont
Loop 2 Hot Leg RTD.Conn (2-7-25)
Loop 2 Cold Leg RTD
Conn (2-7-25)
Loop 2 RTD ManifoldRet Hdr (2-7-25)
Line No. &Ilsl sls. ss.
2S6-3489-3SPL[1.4-28] .
2S6-3799-3SPL11.4-28]
2S6-1147-3SPL[1.4-283
PTVT-3
(VT-4) .
VT-3(VT-4)
VT-3(VT-4)
B-K-1B-K-22 Supports 100K21
B-K-21 Support 100K1
B-K-23 Supports 100$32
One
OneTwoThree
TwoThree
OneTwoThree
100B-K-2~$
70100
8-K-250
100
B-K-24070
100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: Pi e Su orts 8-K-1 8-K-2TABLE: 1.4PAGE 46 of 57
R
ITEM COMPONENT OR SYSTEMG N L
IDENTIFICATION METH
LITEMS
N N
AMOUNT 8 EXTENT
R
PERIOD DATE & REMARKS
8-K
810.10811.10
~Su orts-Cont'd
Support Attach'tSupport Components
810.10
3 Inch Nom. Diameteront
Loop 3 Hot Leg RTD
Conn (2-7-15)
Loop 3 Cold Leg RTD
Conn (2-7-15)
Loop 3 RTD ManifoldRet Hdr (2-7-15)
Line No. 8
2S6-3495-3SPL .
[1.4-29]
2S6-3800-3SPL[1.4-29]
2S6-1153-3SPL[1.4-29]
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
5 8-K-21 Support 100K22
8-K-21 Support 100K1
2
- 8-K-21 Support lOOX1
2
OneTwoThree
OneTwoThree
OneTwoThree
B-K-22060
100
8-K-2
50100
8-K-2
50100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: Pi e Su orts B-K-1 B-K-2TABLE:
.- PAGE 4 o
C R
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH
L N IITEMS AMOUNT 8t EXTENT PERIOD DATE 8 REMARKS
B-K
B10. 10B11.10
~So orts - Coot'd
Support Attach'tSupport Component
B-K-1 ExamRequirements
Applicable to
B10.10
3 Inch Nom. Diameter(Cont'd)
Loop 4 Hot Leg RTD
Conn (2-7-16)
Loop 4 Cold Leg RTD
Conn (2-7-16)
Loop 4 RTD ManifoldRet Hdr (2-7-16)
Line No. 8
~5I 0
2S6-3496-3SPL11.4-30]
2S6-3801-3SPL[1.4-30]
2S6-1158-3SPLL1.4-30]
VT-3(VT-4)
.'T-3
(VT-4)
B-K-21 Support 100K22
OneTwoThree
B-K-21 Suppor t 100%1
TwoThree
B-K-22 Supports 100K One3 Two3 Three
8-K-20
60100
100
MarkNo.
WeldNo.
VT-3(VT-4)
B-K-22563
100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: Pi e Su orts 8-K-1 B-K-2TABLE: .1.4PAGE 4 o
C TEGORY
ITEN COMPONENT OR SYSTEMGENERAL
ID ENTIFICATION METHTTLITEMS
INT N
AMOUNT 8 EXTENT PERIOD DATER L E
81 REMARKS
B-K
810.10811.10
B10.10811.10
~Su orts-Cont'd
Support Attach'tSupport Component
3 Inch Nom. DiameterCont
Charging Line Loop 4(2-8-64)
Line No. 8
IS I DWG No.
2S6-246-3SPL[1.4-31] VT-3
(VT-4)8-K-21 Support lOOX One
8-K-2Dm
Charging Line Loop 3(2-8-64)
2S6-50-3SPL[1.4-31] VT-3
(VT-4)B-K-21 Support 100% Three
B-K-2100
Boron Inj Cold LegHdr (2-9-19)
2S6-1995-3 and2S6-1016-3 VT-3[1.4-32] (VT-4)
10 8-K-23 Supports 100K34
OneTwoThree
8-K-23060
100
Letdown LineLoop 2 (2-7-8)
2S6-24-3SPL[1.4-33] VT-3
(VT-4)8-K-23 Supports lOOX22
OneTwoThree
B-K-24070
100
PGandE
EN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R ITEM: Pi e Su orts B-K-1 B-K-TABLE: 1.PAGE 4 o
CTGRITEN COMPONENT OR SYSTEM
GENER L ND
IDENTIFICATION METHT
ITEMSEX IN TION
AMOUNT 8 EXTENTN EX RELIEF S
PERIOD DATE 5 REMARKS
8-K
810.10811.10
Blo. 10B11.10
~So orts-Cont'd
Support Attach'tSupport Component
3 Inch Nom. DiameterCont
Pressurizer Pwr RV2PCV-474 (2-7-22)
Line No. &~5I 0 G
2S6-1171-3SPL+[1.4-34] VT-3
(VT-4)B-K-22 Support 100K1
2
OneTwoThree
B-K-0
60100
Pressurizer Pwr Rv2PCV-455C (2-7-21)
2S6-1172-3SPL+ PT[1.4-35] VT-3
(VT-4)
B-K-1B-K-21 Supports1
1
100K
Two
OneTwoThree
100B-K-
66100
Pressurizer Pwr Rv2PCV-456 (2-7-23)
2S6-1195-3SPL+[1.4-36] VT-3 .
{VT-4)B-K-21 Support lOOX1
2
OneTwoThree
B-K-2550
100
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
CATEGORYITEM COMPONENT OR SYSTEM
GENER L NOE
IDENTIFICATION METH
-TOTALITEMS
EXAMIN TI N
AMOUNT 8 EXTENTXAM N TO EXAM R LIEF S
PERIOD DATE 8t REMARKS
MAJOR ITEM: Pi e Su orts B-K-1 B-K-TABLE: l.PAGE 5 o
B-K ~Su orts - Coot'd
B-K-1 ExamRequirementsA licable To
B10.10B11.10
Support Attach'tSupport Component
2 Inch Nom. DiameterLine No. 5~11
MarkNo.
WeldNo.
810.10 Charging Line Aux SprayB11.10 (8-554,595,596)(B11.30)
Reac Cool Pp 1 SealWtr In (8-599)
Reac 'Cool Pp 2 SealWtr In (8-602)-
Reac Cool Pp 3 SealWtr In (8-597)
2S6-51-2SPL+2S6-4532-2SPL[1.4-37][1.4-38][1.4-39]
2S6-54-2(And) 1.5[1.4-40]
2S6-55-2 and2S6-5398-1.5[1.4-41]
2S6-56-2(And) 1.5[1.4-42]
'T-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
33 B-K-211 Supports 100K1111
B-K-21 Support 100K1
1
B-K-21 Support 100K1
1
B-K-21 Support 100K,1
OneTwoThree
OneTwoThree
OneTwoThree
OneTwo
B-K-23366
100
B-K-23366
100
B-K-2.666
100
B-K-2~3
66
(Vlv;Bll.30 Item
Three 100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
J R I EM:TABLE:PAGE
DIABLO CANYON POWER PLANT-UNIT 2
e Su orts - - , B-K-1.4
5 of
ITEM COMPONENT OR SYSTEM IDENTIFICATION METH ITEMS AMOUNT 5 EXTENT PERIOD DATE 5 REMARKS
8-K
B10.10811.10
10.1011.10
~Su orts - Coot'd
Support Attach'tSupport Component
2 Inch Nom. Diameteront
Reac Cool Pp 4 SealWtr In (8-598)
Loop 1 Cold Leg DrainRCDT (7-434)
Loop 2 Cold Leg DrainRCDT (7-436)
Loop 3 Cold Leg DrainRCDT (7-424)
Line No. 8
lEroG. N .
2S6-57-2(And) 1.5[1.4-43]
2S6-958-2SPL+[1.4 44]
2S6-959-2SPL+[1.4-45]
2S6-960-2SPL+[1.4-46]
VT-3(VT-4) .
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
B-K-21 Support 100%1
B-K-2
1 Support 100K1
B-K-21 Support 100|i1
2
B-K-21 Support 100K1
1
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
B-K-2)W
100-100
B-K-2
50100
B-K-2Pi)50
100
B-K-2.g66
100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM:. Pi e Su orts B-K-1 B-K-2TABLE: l.PAGE 5 o
C GRYITEM COMPONENT OR SYSTEM
GEN R L ND
IDENTIFICATION METHT TAL X IN I N
ITEMS AMOUNT 5 EXTENTE TPERIOD DATE
RE E S
5 REMARKS
B-K
Blo. 10B11.10
B10.10Bll.10
~Su orts - Coot'dI
Support Attach'tSupport Components
2 Inch Nom. DiameterCont
Loop 4 Cold Leg DrainRCDT (7-419)
SI Pp 2-1 Inj Hot LegLoop 1 (2-9-.31A,449)
SI Pp 2-1 Inj Hot LegLoop 2 (2-9-31B,450)
Safety Inj Hot LegLoop 3 (9-444)
Line No. 8
T550. I .
2S6-961-2SPL+[1.4-47]
2S6-3863-2[1.4-11]
2S6-3864-2[1.4-123
2S6-1976-2[1.4-48]
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
3 B-K-21 Support 100K1
1
B-K-2
1 Support 100K
B-K-21 Support 100K
1
OneTwoThree
OneTwoThree
OneTwoThree
B-K-20
50100
B-K-2
100
B-K-2
50100
No SupportsIn Boundary
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
CATEG RY
ITEM COMPONENT OR SYSTEMGEN R L
IDENTIFICATION METH
T L= ITEMS
X N I N
AMOUNT 8 EXTENTN
PERIOD DATER
5 REMARKS
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi e Su orts B-K-1 B-K-2TABLE: 1.PAGE 5 of 7
B-K
B10.10B11.10
810.10811.)0
~Sv orts - Cont'd
Support Attach'tSupport Components
2 Inch Nom. Diameteront
Safety Inj Hot LegLoop 4 (9-442)
SI Pps Cold Leg Loop 1
Reci rc (2-9-33,412)
Line No.-8T55~. I .
2S6-1990-2[1.4-49]
2S6-3855-2SPL+[i.4-i5]
VT-3(VT-4)
B-K-2
1 Support 100$OneTwoThree
8-K-2
100100
No supports inboundary
SI Pps Cold Leg Loop 2Recirc (2-9-32,413)
SI Pps Cold Leg Loop 3Recirc (2-9-34,446)
2S6-3856-2SPL+[1.4-16]
2S6-3857-.2SPL+[1.4-17]
VT-3(VT-4)
VT-3(VT-4)
B-K-21 Support 100$
1
B-K-21 Support 100$12
OneTwoThree
OneTwoThree
B-K-25050
100
B-K-2
50100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POMER PLANT-UNIT 2
MAJOR ITEM: Pi e Su orts B-,K-1 B-K-2TABLE: l.PAGE 5 o
C TEG RY
ITEM COMPONENT OR SYSTEMGENE L
IDENTIFICATIONND
METH
TOT LITEMS
EX IN TIONAMOUNT 5 EXTENT PERIOD
T EX R L EF S
DATE 8 REMARKS
B-K
Blo. 10B11.10
Blo. 10B11.10
~Su orts-Cont'd
Support Attach'tSupport Components
2 Inch Nom. DiameterCont
SI Pps Cold Leg Loop 4Recirc (9-445)
Loop 1 Hot Leg RTD ConnHdr (7-442,443)
Loop 2 Hot Leg RTD ConnHdr (2-7-423,448)
Loop 3 Hot Leg RTD ConnHdr (7-425,428)
Line No. 5TEE0, I .
2S6-3858-2SPL+I 1.4-50]
2S6-1139-2SPL[1.4-51]
2S6-1145-2SPL[1.4-52]
2S6-1151-2SPL[1.4-53]
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
B-K-22 Support 100K22
B-K-21 Support 100K12
B-K-21 Support 100K1
2
B-K-21 Support lOOX1
2
OneTwoThree
OneTwoThree
OneTwoThree
OneTwoThree
B-K-2'6
100
B-K-2;666.
100
B-K-22550
100
B-K-2~5
50100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: Pi e Su orts B-K-1 8-K-2TABLE: 1.4PAGE 55 of 57
R
ITEM COMPONENT OR SYSTEMN L NDE L IN N
IDENTIFICATION METH— ITEMS AMOUNT & EXTENT
R L S
PERIOD DATE & REMARKS
B-K
B10.10B11.10
~Su orts - Cont'd
Support Attach'tSupport Components
2 Inch Nom. Diameteront
Loop 4 Hot Leg RTD ConnHdr (7-426,427)
Line No. &sslloso. o
2S6-1157-2SPL[1.4-54] VT-3
(VT-4)8-K-2
1 Support lOOX1
OneTwoThree
B-K-2
50.100
B10.10B11.10
Loop 1 Cold Leg RTD Conn(7-441)
2S6-1140-2SPL[1.4-55] VT-3
(VT-4)B-K-21 Support lOOX
1
B-K-2One T($Two 50Three 100
Loop 2 Cold Leg RTD Conn(7-452)
Loop 3 Cold Leg RTD Conn(7-447)
2S6-1146-2SPL[1.4-56]
2S6-1152-2SPL[1.4-57]
VT-3(VT-4)
VT-3(VT-4)
B-K-21 Support lOOX1
2
B-K-2
1 Support 100K
OneTwoThree
OneTwoThree
B-K-22550 Vlv;Bll.30 Item
100 Vlv;B11.30 Item
B-K-2
100100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POMER PLANT-UNIT 2
MAJ R ITEM: Pi e Su orts B-K-1 B-K-2TABLE: 1.PAGE 5 o
ITEM COMPONENT OR SYSTEM
~Su orts -. Cont'd
G LIDENTIFICATION METH ITEMS
N N
AMOUNT 5 EXTENT PERIOD DATE 8 REMARKS
xam,.RequirementsA licable To
B10.10B11.10
Support Attach't .
Support Components
2 Inch Nom. Diameteront
Loop 4.Cold Leg RTD Conn(7-446)
1.5 Inch Nom. Diameter
Line No. 8
T550. I
2S6-1159-2SPL[1.4-58] VT-3
(VT-4)B-K-21 Support 100K1
1
OneTwoThree
B-K-2
66100
Mar k MeldNo. No.
B10.10B11.10
Boron Inj Tk Out Loop 1
Cold Leg 9-436)9-465)
Boron Inj Tk Out Loop 2Cold Leg (9-431)
9-466)
2S6-1991-1.51.4-59]1.4-60]
2S6-1992-1.5[1.4-61][1.4-62]
VT-3(VT-4)
VT-3(VT-4)
15
32
B-K-25 Supports lOOX One5 Two5 Three
B-K-210 Supports 100K One10 Two12 Three
B-K-2
66100
B-K-21
63100-
PGandE
EN YEAR EXAMINATION PROGRAM
SH C N I S S EHS-CL S
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEN: Pi e Su orts B-K-l, B-K-2TABLE:P G 5 o 5
ITEM COMPONENT OR SYSTEM IDENTIFICATION NETH ITEMS AMOUNT 5 EXTENT PERIOD DATE
R
5 REMARKS
B-K
B10.10B11.10
~Su orts - Cont'd
Support Attach'tSupport Components
1.5 Inch Nom. Diameter
Boron Inj Tk Out Loop 3Cold Leg 9-437)
(9-467}
Line No. 8
IS
IIOG�.I .
2S6-1993-1.5[1.4-63][1.4-64] .
VT-3(VT-4)
18 B-K-26 Supports lOOX One6 Two6 Three
B-K-23366
100
xamRequirementsA licable To
Hark , MeldNo. No.
Boron Inj Tk Out Loop 4Cold Leg (9-439)
(9-468}
2S6-1994-1.5[1.4-65[1.4-66
VT-.3(VT-4)
12 B-K-24 Supports 100K One
TwoThree
B-K-23366
100
PGandE
TEN YEAR EXAMINATION PROGRAM .
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R.IT M: PUMPS B-G-1TABLE: 1.PAGE 1 o 5
R
ITEM COMPONENT OR SYSTEMN L
IDENTIFICATION METH
TITEMS AMOUNT 8 EXTENT PERIOD DATE 5 REMARKS
B-G-1
B6.180
PUMPS
REACTOR COOLANT PUMPS
Pressure RetainingBoltingLarger than 2" dia.
Pump 2-2 Ser. No. 712Pump 2-3 Ser. No. 713Pump 2-4 Ser. No. 714
Pump FlangeBolts and Studs, InPlace, Pump 2-17Typscal)
DWG. REF.DC663207-34*[1.5-1]
FlangeBolting
Pump chosen foexaminationwill depend onmaintenance.schedule
Bolts No. 1
Thru No. 24UT
'emar
ks
24
Exam'n area meetsor exceeds req'tsof Fig.IWB-2500-12
8 Bolts 100%8 Bolts8 Bolts
One .
TwoThree
3366100
[*] ISI DWG.
Page No.
PUMPSIIIB-2500-1Footnote (2)requires threadsin base material8 ligaments tobe examined whendisassembled.Deferral of ins-pection to endof interval isallowed.
Ser. No. 711Footnote 4 ofCategory B-G-1Ref. B-L-1 whichspecifies onepump.
B6.190Pump FlangeBolts and Studs, WhenRemoved, Pump 2-1
[1.5-1] UTPT/MT 24 24 Bolts 100K
(See Above)Three . 100
B6.200 Boltin (Ligamentsetween bolt holes)
VT-1 24 Ligaments 100K 'hree 100 Threads)When Bolts are
Removed)
PGandh
EN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
C G R
ITEM ~COMPONENT OR SYSTEMN L N
IDENTIFICATION METHL I
ITEMS AMOUNT & EXTENTR L S
PERIOD DATE & REMARKS
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR TEM: PUMPS 8-G-1TABLE:PAGE 2 o 5
8-G-2
B7.60
B7.60
B7. 60
B7.60
'UMPS
- ContinuedRIDKTOR COOLANT PUMPS
Pressure RetainingBolting(2" Dia. and Less)
Bolts, Studs, 8 NutsPump 2-1
Bolts, Studs, 8 NutsPump 2-2
Bolts, Studs, & NutsPump 2-3
Bolts, Studs, & NutsPump 2-4
Seals HouseBolting
Bolts No. 1
Thru No. 12[1.5-1]
B.olts No. 1
Thru No. 12[1.5-1]
Bolts No. ) .
Thru No. 12[1.5-1]
Bolts No. 1
Thru No. 12[1.5-1]
VT-1
VT-.1
VT-1
VT-1
12
12
12
12
(Remarks)
4 Bolts )OOX4
4 Bolts )OOX4
~ 4 Bolts )00%
4
4 Bolts )OOX4
One.TwoThree
OneTwoThree
OneTwoThree
OneTwoThree
3366100
3366100
3366100
3366100
AccessibleSurfaces
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PUMPS 8-G-1TABLE: l.PAGE 3 of 5
CTGRITEM COMPONENT OR SYSTEM
G N LIDENTIFICATION
NDE
METH
LITEMS
E N
AMOUNT 5 EXTENT PERIOD DATER L EF S
5 REMARKS
B-K-1
B10.20
B-K-2
811.20
B10.20
811.20
PUMPS - ContinuedREACTOR COOLANT PUMPS
Integrally WeldedAttachments(To Pressure Bound.)
Support Components
Support ComponentsPump 2-1
Welded AttachmentsPump 2-1
Support ComponentsPump 2-2
SupportComponents(1) Remarks
WELDS
81, 82, 03[1.5-1]
(1)Remar ks
VT-3
PT
VT-3
Exam'n Area meetsor exceeds req'tsof IWB-2500-15(Typical Design)
Remarks
Remarks
1 Lug 100K1 Lug 100K1 Lug 100K
Remarks
One
OneTwoThree
Two
25
33=67
100
50
[ ] ISI DWG.
Page No.
(1).Bll.20 Items<inc use all pumpsupport members(support lugs,bolts, 8 column,lateral sup-port'embers)
Welded attachm'treq'd on one
'ump.CategoryB-K-1 Footnote 1
Ref. B-J whichspecifies 1 loop
(1) Includes allpump supportmembers.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
R
ITEM COMPONENT OR SYSTEMN
IDENTIFICATION METH
R : PU PS B--TABLE: 1.5PAGE 4 o 5
TITEMS
N
AMOUNT 8t EXTENTE RLE S
PERIOD DATE 8 REMARKS
PUMPS - ContinuedREACTOR COOLANT PUNPS
B-K-2B11. 20
811.20
B11.20
Support Components(Continued)
Support ComponentsPump 2-3
Support ComponentsPump 2-4
SupportComponents
(1) Remarks
Remarks
VT-3
VT-3
(1)
(1)
Remarks
Remarks
Three 75
Three 100
(1) Includes allpump supportmembers.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
C TEGORY
ITEM COMPONENT OR SYSTEMGENE L
IDENTiFICATIONND
METHT LITEMS
IN N
AMOUNT 5 EXTENT PERIOD
J R : PUMPS B-G-1TABLE: 1.5PAGE 5 o 5
DATER L
5 REMARKS
B-L-1
B12. 10B-L-2
B12.10
PUHPS - ContinuedREACTOR COOLANTPUMPS
Pressure RetainingWeldsPump Casing WeldsPump Casing Interior
Reactor CoolantPump 2-1, 2-2, 2-3,or 2-4, dependenton maintenanceschedule.
DWG. REF.DC663207-34*[1.5-1]
Pump CasingWelds andInteriorSurfaces
Pump BodyGirth Weld(Item 29,30,31 or 32)
RT
The exam'n method. shown in
IWB-2500-1 (S-78)was corrected byERRATA (W-78)Deleting surfacereq't.
Exam'n area meets. or exceeds req'tsof FigureIWB-2500-16
1 Pmp Girth Weld Three 100K
[*] ISI DWG.
Page No.
RT of Girth Weldas Technologyallows.
B12. 20 Reactor CoolantPump 2-1, 2-2, 2-3or 2-4, dependenton maintenance.schedule.
InternalSurfaces(Item 25,26,27 or 28)
VT-1 1 Interior 100KPump Surface
Three 100$ Table IWB-2500-1, Footnote 1
requires exam.on one pump.Deferral ofexam to end ofinterval ispermitted. Pumpwill be select-ed on basis ofmaintenance'chedule.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: VALVES B-GTABLE: 1.6PAGE 1 of 1
CATEGORY
ITEM COMPONENT OR- SYSTEMGENERAL NDE
IDENTIFICATION,METHTOTAL EXAMINATIONITEMS AMOUNT & EXTENT
EXAM N X TO EXAM RELIEF S
PERIOD DATE & REMARKS
B-G-1
B6.210
B6.220AndB6.230
B-G-2B7.70
B7.70
Val ves
Pressure Retainin~Bo tin LargerThan 2-inch Dia.)
Bolts and Studs, inPlaceBolts and Studs,When RemovedBolting
Pressure Retaining(2-inch Dia. and .
Less)
14 Inch Nom. Dia.
Hot Leg RecircBefore 2V-8702[1 4-10]* (2-10-21,22)
- Remarks-
Line No.
Valve No. s
2S6-109-14S PL
2V-8702VT-1
-Percentage bySystem Size
Bonnet ~Boltin
16 Studs lOOXand Nuts 100K'ne 50
[*] ISI DWG.
Page No.
B6.210$ B6.220And B6.230Items NotApplicable
Manufacturerr~5
Copes-Vul canGM-48SEZ
Loop 4 Hot Leg Be-fore 2V-8701[ 1.4-10] (2-10-21,22)
2S6-1665-14SPL2V-8701 VT-1 16 Studs lOOX
and Nuts 100KTwo 100 Copes-Vulcan
GH-48SEZ(Note B12.40)
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASNE SECTION XI SYSTEMS-CLASS I
CATEGORY.
ITEM COMPONENT OR SYSTEMGENERAL NDE
IDENTIFICATION NETHTOTALITEMS
EXAMINATIONAMOUNT 8i EXTENT
EXAM N
PERIOD
JOR ITEN'ALVES B-GTABLE: 1.PAGE 2 of 1
X TO EXAN RELIEf SDATE 5 REMARKS
B-G-2
B7.70
B7.70
Valves - Cont'd.
(2-inch Dia. andLess)Bolts, Studs andNuts
10 Inch Nom. Dia.
Accumulator Injec-tion Loop 1
(2-9-11)[ 1.4-6]
Accumulator Injec-tion Loop 2(2-9-12)[ 1.4-7]
Line No.~Va ve Bo. s
2S6-253-10SPL.2V-8956A2V-8948A
2S6-254-10SPL2V-8956B2V-8948B
VT-1VT-1
VT-1VT-1
(8)
(2)1
1
(2)1
1
Bonnet ~Boltin
16 Studs 100K16 Studs 100%and Nuts 100K
16 Studs 100%16 Studs 100Kand Nuts lOOX
OneTwo
TwoThree
1338
5075
Manufacturer~~a
Darling10C48Z
Darling10C48Z
Accumulator Injec-tion Loop 3(2-9-13)[ 1.4-8]
2S6-255-10SPL2V-8956C2V-8948C
VT-1VT-1
(2)1
1
16 Studs 100%16 Studs 100Kand Nuts
OneThree
25 Darling88 , 10C48Z
Accumulator.Injec-tion Loop 4(2-9-14)[ 1.4-9]
2S6-256-10SPL2V-8956D-2V-8948D
VT-1VT-1
(2)1
116 Studs 100K16 Studsand Nuts
TwoThree
63100
Darling10C48Z
PGandh
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
J R EM:TABLE:PAGE
DIABLO CANYON POMER PLANT-UNIT 2
LVES B-G1.6
3 0
ITEM COMPONENT OR SYSTEMN R
IDENTIFICATION METH ITEMS AMOUNT 5 EXTENT PERIOD DATE 8 REMARKS
B-G-2
B7.70
B7.70
Valves - Cont'd
(2-inch Dia. andLess)Bolts, Studs andNuts
8-inch Nom. Dia.
SIS to RCS Loop 1
Hot Leg.(2-9-31A,449)[1.4-11]
Line No.7aave o. s
2S6-2575-82V-8740A YT-1
(2) Bonnet ~Boltin
1 16 Studs lOOX
and Nuts
One 50
Manufacturer~~&
Darling8C48Z
B7.70
SIS to RCS Loop 2Hot Leg(2-9-318,450) [1.4-12]
6-inch Nom. Dia.
2S6-2576-82V-8740B VT-1 16 Studs 100K
and NutsThree 100
Darling8C48Z
Safety Inj Loop 1
Hot Leg(2-9-31A,449) [1.4-11]
Safety Inj Loop 2Hot Leg(2-9-31B,450) [1.4-12]
2S6-235-6SPL2V-8949A
2S6-236-6SPL+2V-8949B
VT-1
YT-1
12 Studs 100Kand Nuts
12 Studs 100Kand Nuts
One
Two
25
50
Vel an6C58
Vel an6C58
Safety Inj Loop 3Hot Leg(2-9-35) [1.4-13]
2S6-237-6SPL+2V-8949C VT-1 1 12 Studs 100K Three 75
Velan6C58
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
JOR ITEM: ALVES B-GTABLE: 1.6PAGE 4 of 17
CATEGORY
ITEM COMPONENT OR SYSTEMGENERAL
IDENTIFICATIONNDE
METHOTAL EX INATION
ITEMS AMOUNT 5 EXTENTEXAM N
PERIODTO
DATEEXAM RELIEF S
8l REMARKS
B-G-2B7.70
(2-inch Dia. and LessBolts, Studs 5 Nuts)
6-inch Nom. Dia.-Cont d
Safety Inj Loop 4Hot Leg(2-9-36) [1.4-14]
RHR Pp 2-1 Inj ColdLeg 1(2-9-33,412) [1.4-15]
.RHR Pp 2-1 Inj ColdLeg 2(2-9-32,413) [1.4-18]
RHR Pp 2-2 Inj ColdLeg 3.(2-9-34,446) [1.4-17]
Line No.~Va ve No. e
2S6-238-6SPL+2V-8949D
2S6-3844-6SPL2V-8818A
2S6-3845-6SPL2V-8818B
2S6-3846-6SPL2V-8818C
VT-1
VT-1
VT-1
VT-1
Bonnet ~Boltin
12 Studs 100Kand Nuts
12 Studs 100$and Nuts
12 Studs 100$and Nuts.
12 Studs 100Kand Nuts
Three
One
Two
Three
100
25
50
75
ManufacturerE~Es
Vel an6C58
Vel an6C58
Vel an6C58
Velan6C58
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: VALVES B-GTABLE: l.PAGE 5 o 1
C TEGORYITEM COMPONENT OR SYSTEM
GENERALIDENTIFICATION
NDE
METHT T L E AMINATIONITEMS AMOUNT 8 EXTENT
N .TPERIOD DATE
EXAM R LIEF S
5 REMARKS
B-G-287.70
(2-inch Dia. and Less)Bolts, Studs and Nuts
6-in. Nom. Dia. Cont'd
RHR,Pp 2-2 Inj ColdLeg 4(2-9-21,34) [1.4-18]
Line No.Vaave o. s
2S6-3847-6SPL2V-8818D VT-1
Bonnet ~Boltin
12 Studs 100%and Nuts
Three 100
Manufacturer~ashy
Velan6C58
Pressurizer 2RV-8010AInlet (2-7-17)[1.4-19]
2S6-729-62RV-8010A VT-1'2 Studs 100K
and NutsOne 33
Crosby6RV58MSB
Pressurizer 2RV-8010BInlet (2-7-19)[1.4-20]
2S6-728-62RV-8010B VT-1 12 Studs 100K.
and NutsTwo 66
Crosby6RV58MSB
Pressurizer RV-8010CInlet (2-7-18)[1.4-21]
2S6-727-62RV-8010C VT-1 12 Studs lOOX
and NutsThree 100 6RV58MSB
B7.70 4-inch Nom. Dia.~w'w(2-7-12,10)[1.4-23] [1-4-24]
2S6-13-4SPL2V-8033C2V-8033D
2-PCV-455B
VT-1VT-1VT-1.
6I12 Studs 100%12 Studs 100%8 Studs 100
and Nuts
OneTwoThree
3366100
Velan4G584G58Co'pes-Vulcan4Ra58RGA
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM VALVES B-GTABLE: '1.6PAGE 6 of 17
CATEGORY
ITEM COMPONENT OR SYSTEMGENE L
IDENTIFICATIONNDE
METHTOTALITEMS
E AMIN TIONAMOUNT 5 EXTENT
EXAM N
PERIODTO
DATEEXAM RELIEf S
& REMARKS
B-G-2B7.70
B7.70
(2-inch Dia. and Less)Bolts, Studs and Nuts
4-inch Nom. Dia.Cont d
Valves - Cont'dLoop F Spray .
(2-7-10,11) [1.4-24][1.4-25]
3-inch Nom. Dia.Loop 1 Hot Leg RTD
Conn.(2-7-24) [1.4-27]
Loop 2 Hot Leg RTDConn.(2-7-25) [1.4-28]
Loop 3 Hot Leg RTDConn.(2-7-15) [1.4-29]
Loop 4 Hot Leg RTDConn.(2-7-16) [1.4-30]
Line No.~Va ve No. s
2S6-14-4SPL2V-8033A2V-8033B
2-PCV-455A
2S6-3488-3SPL2V-8073A
2S6-3489-3SPL2V-.8073B
2S6-3495-3SPL2V-8073C
. 2S6-3496-3SPL2V-8073D
VT-1VT-1VT-1
VT-1
VT-1
VT-1
VT-1
(3)1
1
1
(22)
Bonnet ~Boltin
12 Studs 100K12 Studs 100K8 Studs IDOLS
and Nuts
12 Studs lOOXand Nuts
12 Studs lOOXand Nuts
12 Studs 100Kand Nuts
12 Studs IDOLand Nuts
OneTwoThree-
One
Two
Three
Thr ee
3366100
25
50
75
100
ManufacturerE~ER
Vel an4G584G58Copes-Vulcan4RA58RGA
Velan3G58
Velan3G58
Vel an3G58
Vel an3G58
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: VALVES B-GTABLE: 1.6PAGE 7 of 17
CATEGORY
ITEM COMPONENT OR SYSTEMGENERAL
IDENTIFICATIONNDE
METHTOTAL EXAMINATIONITEMS AMOUNT 5 EXTENT
EXAM N TO EXAM RELIEF S
PERIOD DATE 5 REMARKS
B-G-2B7.70
(2-inch Dia. and Less)Bolts, Studs-and Nuts
3-inch Nom. Dia.Cont d
Valves - Cont'd
Loop 1 RTD ManifoldRet Hdr.(2-7-i3) [1.4-27]
Line No.Valve No. s
2S6-1141-3S PL
2V-8074A VT-1
Bonnet ~Boltin
12 Studs 100Kand Nuts
One 25
Manufacturer
Velan3G58
Loop 2 RTD ManifoldRet Hdr.(2-7-25) [1.4-28]
2S6-1147-3SPL2V-8074B VT-1 12 Studs 100K
and NutsTwo 50
Velan3G58
Loop 3 RTD ManifoldRet Hdr.(2-7-i5) [1.4-29]
2S6-1153-3SPL2V-8074C VT-1 12=Studs 100K
and NutsThree 75
Velan3G58
Loop 4 RTD ManifoldRet Hdr.(2-7-16) [1.4-30]
2S6-1158-3SPL2V-8074D VT-1 12 Studs 100K
and NutsThree 100
Velan3G58
Charging Line Loop 4(2-8-64) [1.4-31]
2S6-246-3SPL2V-8378B2V-83798
VT-1VT-1
12 Studs 100K12 Studsand Nuts
OneTwo
50100
Vel an3C583C58
PGandE
EN YEAR EXAMINATION PROGRAM
SHE SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
JOR I EH: VALVES B-GTABLE: 1.PAGE 8 o 1
CATEG RY
ITEM COMPONENT OR SYSTEM
GENER LIDENTIFICATION
NDE
METH
T LITEMS
AMIN TIONAMOUNT 8i EXTENT
E AM N TO
PERIOD DATEE R LIE S
8i REMARKS
B-G-287.70
Valves - cont'd
(2-inch Dia. and Less)Bolts, Studs and Nuts
3-inch Nom. Dia.-
Charging Line Loop 3(2-8-64) [1.4-31]-(CVCS Alternate)
Boron Inj Cold LegsHdr(2-9-19) [1.4-32]
Letdown Line Loop 2(2-7-8) [1.4-33]
Pressurizer Power RV
2PCV-474 (2-7-22)[1.4-34]
Pressurizer Power RV
2PCV-455C (2-7-21)[1.4-35]
Line No.Vaave o. s
2S6-50-3SPL2V-8379A2V-8378A
2S6-1016-32V-8820
2S6-24-3SPL+2V-80762-LCV-459(2")2-LCV-460
2S6-1171-3SPL+2V-8000A2-PCV-474
2S6-1172-3SPL+2V-8000B2-PCV-455C
VT-1'T-.1
VT-1
VT-1VT-1VT-1
VT-1VT-1
(2)VT-1VT-1
(3)~ 1
1
1
(2)1
1
Bonnet ~Boltin
12 Studs 100K12 Studs 100Kand Nuts
12 Studs 100$and Nuts
2 Studs 100K6 Studs 100K8 Studs lOOXand Nuts
12 Studs 100K8 Studs 100K
and Nuts
12 Studs 100K8 Studs 100K
and Nuts
TwoThree
One
OneTwoThree
TwoThree
TwoThree
50100
100
3366100
50100
50100
ManufacturerI~ItVelan3C583C58
Velan3C58
Vel an3T58Copes-Vulcan(2")Masoneilan3IA58RGP
Velan3GH58FNMasoneilan3IA58RGP
Vel an3GM58FNHasoneilan3IA58RGP
PGandE
TEN YEAR EXAMINATION PROGRAMASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: VALVES B-GTABLE: l.PAGE 9 of 17
CATEGORY
ITEM COMPONENT OR SYSTEMGENERAL NDE
IDENTIFICATION METHT T L E NATIONITEMS AMOUNT 5 EXTENT
EX N TPERIOD DATE
EX RELIEF S
5 REMARKS
8-G-2B7.70
Valves - Cont'd
(2-inch Dia. and Less)Bolts, Studs and Nuts
3-inch Nom. Dia.Cont d
Pressurizer Power RV2PCV-456 (2-7-23)I 1.4-36]
Line No.~Va ve No. s
2S6-1195-3S PL+2V-8000C VT-.1
2-PCV-456 VT-1
(2)1
1
Bonnet ~Boltln
12 Studs 100K8 Studs lOOX
and Nuts
TwoThree
50100
Manufacturer~~|
3GM58FN3IA58RGP
B7.70 2-inch Nom. DiaCharging Line AuxSpray(2-8-596)I 1.4-39j
2S6-51-2SPL2V-8145
2S6-4532-2SPL2V-8148
VT-1
VT-1
(2)1 6 Studs lOOX
and Nuts
6 Studs lOOXand Nuts
One
Two
50
100
Copes-Vulcan2IA58RE
2IA58RE
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEI1S-CLASS I
DIABLO CANYON POMER PLANT-UNIT 2
MAJOR ITEM'ALVES 8-GTABLE: 1.PAGE 10 o 1
G R
ITEM COMPONENT OR SYSTEMN L
IDENTIFICATIONN E
METHL N N
ITEMS AMOUNT & EXTENT PERIODR
DATE & REMARKS
B-G-2-B7.70
Valves - Cont'd
(2-inch Dia. and Less)Bolts, Studs and Nuts
2-inch Nom. Dia.
Loop 1 Cold LegDrain RCDT (7-434)-[1.4-44]
Loop 2 Cold LegDrain RCDT (7-436)[1.4-45]
Loop 3 Cold LegDrain RCDT
(7-424)[1.4-46]
Loop 4 Cold LegDrain RCDT (7-419)[1.4-47]
Line No.Paave o. s
2S6-958-2SPL2V-8057A,2V-8058A.
2S6-959-2SPL+2V-8057B2V-8058B
2S6-960-2SPL+2V-8057C2V-8058C
2S6-961-2SPL+
2V-8057'V-8058D,
VT-1VT-1.
VT-1VT-1
(2)VT-1VT-1
VT-1VT-1
(2)1
1
(2)1
1
(2)11
Bonnet ~Boltin
2 Bolts 100K2 Bolts 100T
and Nuts
2 Bolts 100K2 Bolts 100%
and Nuts
2 Bolts lOOX2 Bolts 100K
and Nuts
2 Bolts 100K2 Bolts 1005
and Nuts
OneOne
TwoTwo
ThreeThree
ThreeThree
1325
3850
6375
88100
Manufacturer~et e
(Rockwel 1 )Edwards 2T58Edwards 2T58
Edwards 2T58Edwards 2T58
Edwards 2T58Edwards 2T58
Edwards 2T58Edwards 2T58
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
J R : AL ES B-G
TABLE: '.PAGE ll o
G R
ITEM COMPONENT OR SYSTEMG N L
IDENTIFICATION METH
L N N
ITEMS AMOUNT 8i EXTENT
E R
PERIOD DATE 5 REMARKS
B-G-2
B7.70
Valves - Cont'd
(2-inch Dia. andLess)
Bolts, Studs andNuts
2-in. Nom. Diameter
Loop 1 Hot Leg RTD
Conn Hdr. (7-422,443)[ 1.4-51]
Line No.Vaave o. (s
2S6-1139-2SPL2V-8063A2V-8067A
VT-1VT-1
(2)1
1
Bonnet ~Boltin
2 Bolts 100K2 Bolts lOOXand Nuts
OneOne
1325
ManufacturerX~Xt
(Rockwell)Edwards 2T58Edwards 2T58
Loop 2 Hot Leg RTD
Conn Hdr. (7-423,448)[ 1.4-52]
2S6-1145-2SPL2V-8063B2V-80678
VT-1VT-.1
(2)
1
2 Bolts 100K2 Bolts lOOXand Nuts
TwoTwo
3850
Edwards 2T58Edwards 2T58
Loop 3 Hot Leg RTD
Conn Hdr. (7-425,428)[ 1.4-53]
2S6-1151-2SPL2V-8063C2V-8067C
VT-1VT-1
(2)1
1
2 Bolts 100K2 Bolts lOOXand Nuts
ThreeThree
6375
Edwards 2T58Edwards 2T58
Loop 4 Hot Leg RTD
Conn Hdr. (7-426,427)[.1.4-54]
2S6-1157-2SPL2V-806302V-8067D
VT-1VT-1
(2)1
1
2 Bolts 100$2 Bolts 100K
and Nuts
ThreeThree
88100
Edwards 2T58Edwards 2T58
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R I M: VALVES 8-GTABLE: 1.6PAGE 12 o 17
G
ITEM COMPONENT OR SYSTEMN L
IDENTIFICATION METH ITEMS AMOUNT 8i EXTENT PERIOD DATE 8i REMARKS
B-G-2
B7-70
Valves - Cont'd
(2-inch Dia..andLess)
Bolts; Studs andNuts
2-in. Nom. Dia.ont
Loop 1 Cold Leg RTD
Conn (7-441)[1.4-55]
Loop 2 Cold Leg RTDConn (7-452)[1.4-56]
Line No.Vaave o. s
2S6-1140-2SPL2V-&089A.2V-8088A2V-8075A
2S6-1146-2SPL2V-8089B2V-808&B2V-8075B
VT-1VT-1VT-1
VT-1VT-1VT-1
(3)11
1
(3)1
1
1
Bonnet ~Boltin
2 Bolts 100K,2 Bolts 100K
= 2 Bolts lOOTand Nuts
2 Bolts 100K2 Bolts 10052 Bolts 100T
and Nuts
OneOneOne
TwoTwoTwo
&
1725
334250
Manufacturer~~5S t
(Rockwell)Edwards 2T58Edwards 2T58Edwards 2T58
Edwards 2T58Edwards 2T58Edwards 2T58
Loop 3 Cold Leg RTDConn (7-447)[1.4-57]
2S6-1152-2SPL2V-8089C2V-8088C2V-8075C
VT-1VT-1VT-1
(3)1
1
1
2 Bolts 100$2 Bolts 100K2 Bolts 100T
and Nuts
ThreeThreeThree
586775
Edwards 2T58Edwards 2T58Edwards 2T58
PGandE
EN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: VALVES B-GTABLE: 1.6PAGE 13 of 17
CATEGORY
ITEM COMPONENT OR SYSTEMGENERAL NDE
I0ENTI FICATION METHTOTALITEMS
EXAMINATIONAMOUNT 5 EXTENT
EXAM N T EX RELIEF S
PERIOD DATE 8i REMARKS
B-G-2
B7.70
Valves - C ont'd
(2-inch Dia. andLess)
Bolts, Studs andNuts
2-in. Nom. DiameterCont d
Loop 4 Cold Leg RTDConn (7-446)I 1.4-58]
Line No.~Va ve Bo. s
2S6-1159-2SPL2V-808902V-8088D2V-8075D
VT-1VT-1VT-1
(3)1
1
1
Bonnet ~Boltin
2 Bolts 100K2 Bolts 100K2 Bolts 100%and Nuts
Thr eeThreeThree
8392100
Manufacturer5 Style
Edwards, 2T58Edwards 2T58Edwards 2T58
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: V LVES B-GTABLE:PAGE 14 of 17
G R
ITEM COMPONENT OR SYSTEMN L
IDENTIFICATIONNDE
METH
L X N N
ITEMS AMOUNT & EXTENT PERIOD DATER F S
8t REMARKS
B-G-287.70
VALVES - Continued
(2-inch Dia. and Less)Bolts, Studs, and Nuts
1.5-Inch Nom Diameter
Boron Inj Tk Out LooplCold Leg (9-436)[ 1.4-59 ]
Boron Inj Tk Out Loop2Cold Leg 9-431)[ 1.4-61
Boron Inj Tk Out Loop3Cold Leg 9-437)[ 1.4-63
Boron Inj Tk Out Loop4Cold Leg (9-439)[ 1.4-65 ]
Line No.Valve No. s
2S6-1991-1.52V-8810A
2S6-1992-1.52V-8810B
2S6-1993-1.52V-8810C
2S6-1994-1.52V-8810D
VT-1
VT-1
VT-1
VT-1
(4) Bonnet ~Bol tin
2 Bolts 100Kand Nuts
2 Bolts 100Kand Nuts
2 Bolts 100Kand Nuts
2 Bolts 100Kand Nuts
One
Two
Three
Three
25
50
75
100
Manufacturer
Edwards 1.5T58
Edwards 1.5T58
Edwards 1.5T58
Edwards 1.5T58
PGancfE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R TEM'ALVE SUPPORTS B-K-1 B-K-2TABLE: 1.6PAGE 15 of 17
R
ITEM COMPONENT OR SYSTEMG N
IDENTIFICATION METHL
ITEMSN T N
AMOUNT 8 EXTENT PERIODE R
DATE 5 REMARKS
B-K-1B10.30
VALVES - Continued
Integrally WeldedAttachments(To Pressure Boundary
(Attach't) Remarks- B10.30Not Applicable-No WeldedAttachments toValves
B-K-2B11.30
Support Components (Supports-) Remarks Included in TabSection 1.4,Scheduled withPipe Supports.
Note Comments onPage ii in TabSection 1.4
PGandE
EN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: VALVE BODIES B-M-1 B-M-2TABLE: 1.PAGE 16 of 17
CATEGOR
ITEM COMPONENT OR SYSTEMGENER L
IDENTIFICATIONNDE
METHT TAI E AMIN T N
ITEMS AMOUNT 5 EXTENTEXAM N
PERIODT EXAM RELIEF S
DATE 8 REMARKS
B-M-1B12.30
VALVES - Continued
Valve Body Welds Remarks
B12.40 Items are listed to indicate theamount and type that require inspectionunder category B-M-2. However, thevalve selection within a series ofvalves performing similar function isoptional and dependent on
maintenance'chedule.
Refer to code item B7.70,tab section 1.6, for complete inventoryof applicable components.
[*] ISI DWG.
Page No.B12.30 Items not-applicable.Reference fig.IWB-2500-17
B12.40 Items areselected in accordancwith IWB-2500-1,footnote 3, exam'nperiod optional (*)
B-M-2B12. 40
Valve Body-exceeding4 in. nom. diameter
(Internal Surfaces)
Loop 4 Hot Leg Before2V-8701 (2-10-21,22)[1.4-10]*Accumulator InjectionLoop 1 (2-9-11) [1.4-6]
Line No.Valve No.
2S6-1665-14SPL2V-8701
2S6-253-10SPL2V-8956A
VT-1
VT-1
Valve Interior
1 Valve (surface)
1 1 Valve (surface)
(*)
Three
Three
100
100
Manufacturer5 Style
Copes-VulcanGM-48SEZContainment IsolDar ling, 10C48ZCheck Valve
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS I
DIABLO CANYON POMER PLANT-UNIT 2
MAJ R ITEM: VALVES B-M-2TABLE:PAGE 1 o
ITEM COMPONENT OR SYSTEM IDENTIFICATION NETH ITEMS AMOUNT 8 EXTENT PERIOD DATE 5 REMARKS
B-M-2B12.40
Valves - Cont'd
Valve BodyInterior, Cont'd
Safety Inj Loop 1
Hot Leg (2-9-31A,449)[1 4-111
Pressurizer 2RV-8010BInlet (2-7-19)[1.4-20]
Line No.Vaave No.
2S6-235-6SPL+2V-8949A
2S6-728-6SPL2RV-8010B
VT-1
VT-1
Valve Interior
1 Valve (Surface)
1 Valve (Surface)
(*)
Three
Three
100
100
(*) See Pg. 13
Manufacturer~as'
Velan6C58Check Valve
Crosby6RV58 MSB
Relief Valve
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-.CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R I: PRESSURE VESSELSTABLE: 2.1 STM GEN
PAGE 1- of 18
ITEM COMPONENT OR SYSTEM IDENTIFICATIONN
METH ITEMS AMOUNT 5 EXTENT PERIOD DATE 5 REMARKS
C-A
C1.10C1.20C1.30
C1.30
C1.10
.C1.10
STEAM GENERATORSPPPt » 9Wel ds
Welds 1-3, 1-4, 1-5, and1-7 have removableinsulation windows.All welds in gen. 2-1will be examined inaccordance with IWC-2500Cat. C-A footnote (3).
WELDS
SSse IT CircumferentialHead CircumferentialTube Sheet to Shell
Steam Generator 2-1(Serial No. 1161)
DWG. REF.DC-663206-77*[2.1-1j
GIRTH WELDS
Girth Wl-2Loop 1
Girth Wl-3Loop 1
Girth Wl-4Loop 1
UT
UT
UT
(5)
Exam'n Area meetsor exceeds req'tsof Fig. IWC-2520-1(CI.IO/C1.20) andIWC-2520-2 (C1.30)
Tube Sheet 100K(to)
Stub Barrel (36')
Stub Barrel 100K(to)
Lower Shell (36')
Shell Barrel 100K(to)
Transition (36')cone
One
One
Two
20
40
60
f*] ISI DWG.
Page No.
T=3. 25/5. 16"C=36'circ.)
T=3.25"/2.82"C=36'circ.)
T=2.82"/3.68"C=36'circ.)
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R : PRESSURE VESSELS
TABLE: 2.1 STM GE
PAGE 2 of 18
ITEM COMPONENT OR SYSTEM ID ENTI F ICATION METH ITEMS AMOUNT 8 EXTENT PERIOD DATE 5 REMARKS
C-A STEAM GENERATORS
continue
C1. 10 Steam Generator 2-1(Serial No. 1161)
Girth Ml-5Loop 1
UT Transition Cone100% (to) UpperBarrel (46')
Three 80 T-3.68"/3.62"C=46'circ.)
C1.20 Girth W1-7Loop 1
UT Upper Barrel 100K Three(to)Upper Head (46')
100 T=3.62"/3.62".C=46'circ.)Note: SteamGenerator 2-2Serial 81162;2-3 1163; 2-41164.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
NAJ R E : PR SSURE VESSELSTABLE: .1 S G N
PAGE 3 o
ITEM COMPONENT OR SYSTEM
N
IDENTIFICATIOND
NETH ITEMS AMOUNT 5 EXTENTN
PERIOD DATER S
5 REMARKS
C-8
C2. 10
C2.20
STEAM GENERATORS
(continued)
Category C-B appliesto pipe diameterover 4"
'ozzles
in vessels<1/2" nominalthickness
Nozzles in vessels>I/2" nominalthickness
Remarks
Steam Gen.(to)Nozzles[2.1-1]
Exam'n area meetsor exceeds req'tsof fig. IWC-2520-3(and) IWC-2520-4as applicable.
IWC-2500-1 foot-note 2 requires(C-B) scheduleaccording to se-lection of cate-gory C-F, (NOTEREMARK) CategoryC-F (S-7S)corresponds tocategory C-G(S-75) for mainsteam and feed-water systems.
[] ISI DWG.
Page No.'s
C2.10 Items notapplicableNOTE C2.20
Schedule inaccordance withpage (i)discussion inTab 2.2.
PGancfE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
R T : R SSU VESSELSTABLE: 2.1 STH GEN
PAGE 4 o
R
ITEH COMPONENT OR SYSTEMGEN
IDENTIFICATION METHL
ITEMSE IN N
AMOUNT 8 EXTENT PERIOD DATEL S
& REMARKS
C-B
C2.20
C2.21C2;22
C2.21
C2.22
STEAM GENERATORS
(continued)
Nozzles in vessels
~Nozz e to Shell (Head)*
InnerRadius'TEAM
GENERATOR 2-1Feedwater Lead 1
Nozzle WeldInner Radius [2.1-1]
Nozzle Meld(to)Shell at2K16-554-16IV
PT or MTUT
UT
1 (see note)
1 (see note)
Two
Two
25
NOTE SUR/VOLperformed onweld joint whenscheduled - VOL
performed oninner radiussection (Fig.IMC-2520-4) toextent possible.
T=3 6"/D=16"Meld WICG-101-1E2.2-21]
C.21
C2.22
C-CC3.)0
STEAM GENERATOR 2-1Main Steam Lead 1
Nozzle WeldInner Radius [2.l-l]
INTEGRALLY WELDED
Support Attachments(To Pressure Vessel)
Nozzle Meld(to)Shell at2K15-228-28V
(Attach't)
PT or HTUT
UT
1 (see note)
1 (see note)
Remarks
Three
Three
25
25
T=3.6"/D-28"Meld WICG-1-1I 2.2-D]UpperHead Nozzle
C3.10 Items notApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PRESSURE VESSELS
TABLE: .1 STM N
PAGE 5 o 1
ITEM COMPONENT OR SYSTEM
I
G
IDENTIFICATION METH
L N N
ITEMS AMOUNT 8 EXTENT PERIODR
DATE 8 REMARKS
C-EC3.20
C3.30
STEAM GENERATORS
(continued)
SUPPORT COMPONENTS
Steam en.
MECHANICAL AND
HYDRAULIC SNUBBERS
Steam Generator 2-1[2.1-1] ,
Steam Generator 2-2[2.1-11
Steam Generator 2-3[2.1-i]
Steam Generator 2-4[2.1-i]
(Snubber)Attachments
Hydraul icSnubbersPl - ImI4
Hydra ul icSnubbersfl - 84
HydraulicSnubbers81 - 84
HydraulicSnubbers01 - 84
VT-3
VT-4
VT-4
VT-4
VT-4
1 Snubber 100KMount and2 AttachmentAreas
4 4 Snub's 100$
4 4 Snub's 100%
4 4 Snub's 100K
4 4 Snub's 100K
OneTwoThree
One
TW0
Three
Three
2550100
25
50
75
100
Examinations onone vessel perIWC-2500-1Footnote 2.
C-DC4.10 Pressure Retaining
Bolting Remarks C4.10 ItemNot applicable
I
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POMER PLANT-UNIT 2
MAJ R TEM: PRESSURE VESSELS
TABLE: .1PAGE 6 o
G R
ITEM
C1.10C1.20C1.30
COMPONENT OR SYSTEM
oron n ection anressure retalnsng
Melds(Struthers Wells Corp.)
WELDS
SShe T CircumferentialHead CircumferentialTube Sheet to Shell
N R
IDENTIFICATION METH .
DC-663216-45*[2.1-2]
GIRTH WELDS.
LITEMS
(2)
.AMOUNT 8 EXTENT PERIOD DATE 8 REMARKS
[*] ISI DWG.
Page No.
Relief 8.007
C1.10 8i C1.30not applicableto B.I.T.
C1.20 Boron Injection Tank2-1(Ser. Number2-70-07-30717-8)
Girth M-A(Top Head)
UT Top Head <OX(to)Shell
'Two 20 T=2 0"/4 15"14.75'circ.)
C1.20
C-BC2.10
Nozzles in Vessels< 1/2 In. NominalThickness
Girth W-B
(Bot Head)
- Remarks-
.,UT Bot Head <OX(to)Shell
Three 40 T=2. 0 "/4. 15"14.75'circ.)
C2.10 Itemsnot applicable
C2.20 Nozzles in Vessels> 1/2 In. NominalThickness[2.2-15][2.1-2]
Top Head ToNozzle MeldMeld 8N-A
PT or MT
UT
(2)
1 One 50 9 Line 2-2033
Bottom Head toNozzle Weld PT or MT
Meld 8N-BThree 100 9 Line 2-2032
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
C G R
ITEM COMPONENT OR SYSTEM
SUPPORT ATTACHMENTS
(To Pressure Vessels)Su ort Com onentsSupport egE2.1-2j
C-C
C-EC3.20
Support LegL2 1-23
Support Leg[2.1-2]
Support LegE2.1-2j
SUPPORTS, MECHANICALAND HYDRAULIC SNUBBERS
C3.30
PRESSURE RETAININGBOLTINGLarger t an sa.)
C-D
C4.10
END OF B.I.T.
GNERLIDENTIFICATION
(Attach't)
Leg-A
Leg-B
Leg-C
Leg-D
Remarks
Manway Bolting
N E ~
METH
PT or MTVT-3
PT.or HTVT-3
PT or MTVT-3
PT or MTVT-3
UTUTUT
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PRESSURE VESSELSTABLE: 2.1 B. I.T.PAGE 7 o
N R
PERIOD DATE 5 REMARKSL IN N
ITEMS AMOUNT 8( EXTENT
Support Leg. T=. 618/. 350
CM. View DN fromManway
To Vessel)To Deck)
One '525
1 Leg 100$and support
1 Leg lOOXand support
1 Leg 100Kand support
1 Leg 100%and support
5050
Two
Three 7575
100100
Three
C3.30 Item notApplicable
Exam area meetsFig INC-2520-6Reqt's
(16).5
56
5 Studs 100K5 Studs 100K6 Studs 100K
OneTwoThree
3060100
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
M J R TEM: PRESSURE VESSELSTABLE: . LPAGE 8 o 1
C T R
ITEM COMPONENT OR SYSTEM
GEN LIDENTIFICATION
NDE
METH
TTL N I N
ITEMS AMOUNT 8 EXTENTN
PERIODE RL FS
DATE 5 REMARKS
C-A
C1. 10C1.20C1.30-
SEAL INJECTION FILTERS DWG. REF.Press. Reta ning We ds DC-663200-42(Coomercial Filters Corp) DC-663200-19
*[2.1-3]
WELDS
%e1T CircumferentialHead CircumferentialTube Sheet To Shell (4)
[*] ISI DWG.
Page No.
Cl.30 Item notapplicable
C1. 10
C1.20
C-BC2.10
C-CC3.10
Seal InjectionFilter 2-1(Ser. 8 17392-1824)
NOZZLES IN VESSELS<1/2" Nomin. Thickness>1/2" Nomin. Thickness
INTEGRALLY WELDED
Support Attachments(To Pressure Vessels)
Girth WeldsWeld Item 1
Shell-Flange
Weld Item 2Bot Head
[2.1-3]RemarksRemarks
[2.1-3]Remarks
Flange(to)Shell
Bot Head(to)Shell
Relief 006'S.I.Filter 2-2
Ser. 17392-1835)
Relief 006
C2.10 EL C2.20Items notApplicable
C3.10 Item NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASNE SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEN'RESSURE VESSELSTABLE: 2.1 FILTERSPAGE 9 o
C TEG R
ITEM COMPONENT OR SYSTEMGENRL
IDENTIFICATIONND
METHTTLITEMS
E AMIN I N
AMOUNT 5 EXTENTEAMR E S
PERIOD DATE 5 REMARKS
C-EC3.20
C3.30
C4.10
SEAL INJECTION FILTERSupport Components
SupportsMechanical andHydraulic Snubbers
PRESSURE RETAININGBOLTING(Larger than 2" dia.)
I 2.1-3]Remarks
Remarks
Remarks
C3.20 Not Req'dIWC-2500-1(4)C3.30 Item NotApplicable
C4.10 Item NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PRESSURE VESSELS
TABLE: . .LPAGE 1 o
C TEG R
ITEM COMPONENT OR SYSTEM
GENER LIDENTIFICATION
N E
METH
L IN N
ITEMS AMOUNT 5 EXTENT PERIOD DATEE R L8 REMARKS
C-A
C1.10C1.20C1.30
C1.10
C1.20
EXCESS LETDOWN .
- HEAT EXCHANGER 2-1
Pressure RetainingWelds
WELDS
%ieeT CircumferentialHead CircumferentialTube Sheet To Shell
Excess Letdown HeatExchanger 2-1Atlas S/N 854
See Relief 8006 forsecondary
DWG. REF.DC-663210-12*[2.1-4]
(Ser, S S54)
GIRTH WELDS
Weld Item 13(Flange)
Weld Item 14(Bot Head)
UT
UT
(2)
1 Bot Flg As(to) AccessShell
Bot Flg As(to) AccessShell
One 50
Two 100
[*jISI DWG.
Page No.
C1.30 Item NotApplicable
Relief 006
Relief 006
C-BC2.10C2.20
C-CC3.10
NOZZLES'N VESSELSom. sc ness
)1/2" Nom'. Thickness
INTEGRALLY WELDED
SUPPORT ATTACHMENTS
To Pressure esse s)
RemarksRemarks
Attach't weldsWeld Item 15Weld Item 16
PT
PT
(2) Attach't 100K(to)Shell
Two 100
C2.10 8I C2.20Items NotApplicableIWC-1220 (c)
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PRESSURE VESSELSTABLE: 2 1 .LPAGE 1 o 1
R
ITEM COMPONENT OR SYSTEMN D
IDENTIFICATION METH
T L E N
ITEMS AMOUNT & EXTENT PERIOD DATE 5 REMARKS
C-EC3.20
C-CC3.30
C-D
C4.10
SUPPORT COMPONENTS
(Remarks)
SUPPORTSMechanical andHydraulic Snubbers
PRESSURE RETAININGBOLTING(Larger than 2" dia.)
Remarks
Remarks
Remarks
C3.20 Item NotReq'd;IWC-2500-1Footnote (4)
C3.30 Item NotApplicable
C4.10 Item NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PRESSURE VESSELSTABLE 2.1 REG.H .PAGE 12 o 18
CTGRYITEM COMPONENT OR SYSTEM
GENER LIDENTIFICATION
NDEMETH
T L EXAMIN I N
ITEMS AMOUNT & EXTENT
EXAM'
PERIOD DATEEXAM RELIEF S
& REMARKS
C-A
C1.10C1.20C).30
C1.10
C1.20
REGENERATIVE HEATEXCHANGERS
33.44.1831-4II, 1831-4III(Joseph Oat & Sons)
WELDS
SSseTT CircumferentialHead CircumferentialTube Sheet to Shell
Regenerative HeatExchanger ShellCircumferential
Shell No. 3 Head-To-Shell Welds
DWG. REF.DC-663210-72
*[2.1-5]
GIRTH WELDS
Girth Weld(remarks)
Girth WeldItem 9
Girth WeldItem 12
PT*
PT*
(2)1 Head (to)
Shell As Access.
Head (to)Shell As Access.
One
Two
25
50
[*] ISI DWG.
Page No.
RegenerativeHeat Exch'sShell 1 and 2Not ExaminedIWC-2500-1Footnote (3)
C1.10 Item NotAppl icab 1 e
PT*Relief 012
T=.756"/ .900"2.5'circ.)Relief 006
T =.756"/.938"2.5'circ.)Relief 006
C1.30 Shell No. 3 TubeSheet To Shell Welds
Girth WeldItem 10
Girth WeldItem 11
PT*(2)
1 Shell (to)Sheet As Access.
Sheet (to)Shell As Access.
Three 75
Three 100
T=.900"/.938"2.5'circ.)Relief 006
T=.938"/.756"2.5'circ)Relief 006
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PRESSURE VESSELSTABLE: 2. R
PAGE 13 o 1
C EGRITEM COMPONENT OR SYSTEM
GENERALIDENTIFICATION
N
METHTTLITEMS
E IN N
AMOUNT & EXTENTN EX REL EF S
PERIOD DATE & REMARKSt
C-B
C2.10
C-CC3.10
C-EC3.20
C3.30
C-D
C4..10
REGENERATIVE HEATEXCHANGER (cont'd)
NOZZLES IN VESSELS
<1/2" Nom. Thickness>1/2" Nom. Thickness
INTEGRALLY WELDED
Support Attachments{To Pressure Vessels)
SUPPORT COMPONENTS
(Remarks)
SUPPORTS
Mechanical andHydraulic Snubbers
PRESSURE RETAININGBOLTING(Larger than 2" dia.)
E2.1-5j
RemarksRemarks
Remarks
Remarks
Remarks
C2.10 andC2.20 ItemsNot ApplicableIWC-1220(c)
C3.20 Item NotReq'dIWC-2500-1Footnote (1)
C3.20 Item NotReq'dIWC-2500-1Footnote {4)
C3.30 Item NotApplicable
C4.10 Item NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R TEM: PRESSURE VESSELSTABLE: 2.1 RHR H .PAGE 1 o
C TEGORY
ITEM COMPONENT OR SYSTEMGENERAL NDE
IDENTIFICATION METH
TOT L E AMIN TI N
ITEMS AMOUNT & EXTENTN
PERIODEXAM REL EF S
DATE & REMARKS
C-A
C1.10C1.20C1.30
C1.10
RESIDUAL HEAT REMOVAL
HEAT EXCHANGER
ng>neers abricatorsCo.)
WELDS
SSsetT CircumferentialHead CircumferentialTube Sheet To Shell
RHR Exchanger 2-1(Ser. 815588-C)
DWG. REF.DC-663217-4,6*[2.1-6]
GIRTH WELDS
Item 21 UT
(2)
(2)
Flg As Access.(to)Shell
Two
[*],ISI DWG.
Page No.
C1.30 N/A
50 (Relief 006)
C1.20
C-BC2.10
C2.20
C2.20
NOZZLES IN VESSELS<1/2" NominalThickness
NOZZLES IN VESSELS>1/2" Nom. ThicknessRHR Exchanger 2-1[2.2-8][2.1-6]
[ 2 2-2 ]
Item 22
Remarks
Nozzle WeldItem 24
Nozzle WeldItem 23
UT
PT
PT
Bot Head(to)Shell
Three
Two
Three
100
50
100
(Relief 006)Note: RHR HX 2-2Ser. 15588-D.
C2.10 Items NotApplicable
At 2S1-112-8(Inlet)
(Rel ief 006)
At 2S1-3551-14Outlet)Relief 006)
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R I EM: PRESSURE VESSELS,TABLE: . RHR H . E
PAGE 1 o
T R
ITEM COMPONENT OR SYSTEMGNE L
IDENTIfICATION METH
LITEMS
N
AMOUNT 8 EXTENT PERIODR L
DATE 5 REMARKS
C-CC3.10
C-CC3.'10C-EC3.20
C3.30
C-DC4.10 .
RHR HEAT EXCHANGERS
continued
INTEGRALLY WELDED
Support Attachments(To Pressure Vessels)
RHR Exchanger 2-1P.1-6](Support Components)2-1
SupportsMechanical andHydraulic Snubbers
Pressure RetainingBolting(Larger than 2" dia.)
[2.1-6]
(Attach't)
Front Item 19Rear Item 20
Front & RearSupports-
Remarks
Remarks
PT
VT-3
(2)
2 Legs 100$(and)
2 Supports
Two
Three
Support Legs
50
50 (Exposed Areas)
C3.30 Item NotApplicable
C4.10 ItemNot Applicable
PGandk
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
8DIABLO CANYON POWER PLANT-UNIT 2
MAJOR TEM: PRESSURE VESSELS
TABLE: 2.1 STAB.SEP R
PAGE 1 of 18
G R
ITEM COMPONENT OR SYSTEM
NRLIDENTIFICATION METH
T LITEMS AMOUNT & EXTENT PERIOD
R
DATE 8 REMARKS
C-A
WELDS
C1.10
C1.20
C1.30
C-B
C2. 10
C2.20
C-CC3.10
C3.20
C3.30
STABILIZER SEPARATOR
9 Recip. Chg. Pp. 1-3=(General Atomics S/NE-610)
Shell Circumferential
Head CircumferentialTop Head-To-ShellBottom Head-To-Shell
Tube Sheet-To-Shell
Nozzle-To-Vessel-Welds
(1/2" Nom. Thickness
>1/2" Nom. Thickness
SUPPORT MEMBERS
Integrally WeldedSupports
Component Supports
Supports-Mech'1 8
Hydraulic,Snubbers
DWG REFDC-663210-180
(Remarks)
Weld G-AWeld G-B
(Remarks)
Remarks
Remarks
Remarks
Support Skirt
Remarks
UTUT,
VT-3
360's Accessibl360's Accessibl
100K
TioThree
Three
50100
100
Cl.10 Item NotApplicable
Relief 006,-Relief 006
Cl.30 ItemNot Applicable
Not Req'd(IWC-1220-C)Not Applicable
Not Req'd
IWC-2500-1Footnote 1
C3.20 Item NotNot Applicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R : PR SSURE VESSELSTABLE: 2.1 ST B. SEP R
PAGE 17 of 18
C G R
ITEM
C-D
C4.10
COMPONENT OR SYSTEM
PRESSURE RETAININGBOLTING
Larger Than 2" Dia.
G NERALIDENTIFICATION
Remarks
N E
METHT L IN N
.,ITEMS AMOUNT 5 EXTENTN
PERIOD DATEEX 4RL FS8 REMARKS
C4.10 Item NotApplicable
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R TEM: PRESSURE VESSELSTABLE: 2.1 LI . L . D
PAGE o 1
CTGRITEM COMPONENT OR SYSTEM
G N L N
IDENTIFICATION METH ITEMSN N
AMOUNT & EXTENTR L EF S
PERIOD DATE & REMARKS
C-A
C1.10
C1.20
C1.30
C-BC2.10
C2.20
C-CC-E
C-D
LIQUID PULSATIONDAMPENER (Gen. Atomic)9 Recip. Ch. Pp 2-3Welds
Shell Circumferential
Head Circumferential
Tube Sheet'-To-Shell
NOZZLE-TO-VESSEL WELD
<1/2 Nom. Thickness
>1/2 Nom. Thickness
SUPPORT MEMBERS
Pressure RetainingBol ting(Larger than 2" dia.)
DWG REFDC-663210-181-1(Ser. No. E-611)
(Remarks)
(Remarks)
(Remarks)
(Remarks)
(Remarks)
.(Remarks)
(Remarks)
Not Req'd(IWC-2500-1)Footnote 2
C1.20 Item NotApplicable
Cl.30 Item NotApplicable
C2.10 Item NotApplicableNot Req'd( IWC-1220-C)
Category C-Cand C-E Itemsnot applicable,Vessel is sup--ported byattached pipe.
C4.10 Item .
Not Applicable
PGandE
TEN YEAR EXAHINATION PROGRAH
SHE SECTION XI SVSTEHS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEH: PIPING SYSTEH WELDS
TABLE: 2.2PAGE i of 30
The extent and frequency of examination for pipe welds scheduled in the following table conforms to Paragraph'WC-24ll and Table IWC-2520, Category C-F and C-G in the.1974 Edition of Section XI through Summer l975
Addenda.~ Instead of distributing welds over the multiple streams as described in Paragraph IWC-2411(S'75)the "single stream" philosophy of the Summer 2978 Addenda has been adopted throughout. In all cases thelowest numbered line has been selected as typical for the multiple streams, and al'l required examinations areperformed on that stream. The extent of examination per Table IWC-2520 includes the "Areas Subject ToExamination" in the table. All other requirements, including "Parts Examined", conform to Table IWC-2500-1,Category C-F of the 1977 Edition through Summer 1978 Addenda of Section XI. The exemption criteria conformsto the Summer 1978 Addenda as referenced in relief request 005.
NOTE: Code category C-F or C-G appearing in the General Identification column reference 1974 edition, Summer1975, Section XI code categories. 1974 Code category C-F lines circulate reactor coolant while category C-Glines circulate other than reactor coolant. All pipe welds are category C-F in the 1977 Edition, Summer 1978Addenda.
Occasional portions of certain pipe welds are inaccessible for examination. See request for relief BANDE-008.Any inaccessible portions will be fully documented.and the remaining weld area examined to the fullest extentpossible.
~ Ref. 10CFR 50.55a(b)(2)(iv)(B)
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING-CIRCUM. WELDS C-FTABLE: 2.2PAGE 1 o
C TEG R
ITEM
C-F
C5.21
COMPONENT OR SYSTEM
SUB-ITEM OUT OF
SEQUENCE INTENTIONALLYITEMS ARE LISTED BYWALL THICKNESS,CATEGORY (C-F) or(C-G)SINGLE OR MULTIPLESTREAM AND LINE SIZE.
PRESSURE RETAININGWELDS IN PIPING
C5.20 - Piping WeldsOver 1/2" Nom. WallThickness
Circumferential WeldsSingle Stream Systems
ENER L N E
IDENTIFICATION METH
Butt WeldsF
LITEMS
X N
REQUIRED AMOUNT
40 YRxam n area meets
or exceeds req'tsof fig. IWC-2520-7
~Addenda S-75Req'd PercentOver 40 YearService Life
~S-75 Addenda~ercent ToDate Over 10Year Interval
PERIOD(10 YR)
~(IDOL)
YR TODATE
RLEF5 REMARKS
U
ACCORDANCE WITHPAGE (i) I
DISCUSSION, THISTAB SECTION
[*] ISI DWG.
Page No.'s
(**) Construc-tion Dwg. PageNo.'s
T=1.312"
RHR Injection To HotLeg 1 & 2 (2-10-19)**
Cent. Charg. Pps Disch.Hdr (2-8-18)
2S6-120-12*[2.2-5]
2S6-1454-6[2.2-15]
PTUT
PTUT
1 1
5 5 Two
20
17 T=.719"
END SINGLE STRENI, C-F
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
M J R TEM: PIPING-CIRCUM. WILDS 0-FTABLE: 2.2PAGE 2 of 30
C-FC5.21
COMPONENT OR SYSTEM
PIPING - continued
(C5.20) CIRC'L WELDS
Multiple StreamSystems
SIS To RCS Hot LegLoop 1 2-10-19),(2-9-31
N
IDENTIFICATION
Butt Welds
~Ct C-F
2S6-2575-8[2.2-5]
METH
PTUT
T LITEMS RE UIRED AMOUNT
0 YR 10 YR
PERIOD10 YR
YR TODATE
i(ioos)
R L8I REMARKS
iof One Stream,Typical
T=.812"
Line 2575chosen astypical
C-FC5.21
SIS To RCS Hot LegLoop 2 2-10-19),(2-9-'31
End M/S Systems C-F
Single Stream System
Charging Pumps Disch.Emerg. (2-8-18) (2-9-37
Boron Injection TankInlet (2-9-37)
2S6-2576-8[2.2-4]5
Butt Welds-G
2S6-1973-6[2.2-iS]
2S6-2032-6III[2.2-15]
PTUT
PT-UT
6
14 21)i)
OneTwo
(sos)1428
(SOX)
Three 33
T=.719"
T=.719"Safe Ends,Bot 8 Top ofBoron TankIncluded
END SINGLE STREAM,C-G
PGandf.
TEN YEAR EXAMINATION PROGRAM
ASHE SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON. POWER PLANT-UNIT 2
J R M: PIP NG- R U . WELDS C-FTABLE:PAGE 3 of
G R
C-FC5.21
COMPONENT OR SYSTEM
PIPING - continued
(C5.20) CIRC'L WELDS
Multiple StreamSystems
LIDENTIFICATION
Butt Welds
Cate or C-G
METH ITEMSN
RE UIRED. AMOUNT
R R
PERIOD10 YR
YR TODATE
i(50')
R L5 REMARKS
ypsca
T=l;002"
iOf One Stream,T
'
Steam Gen SteamOutlet 2-1 (MS-501013)
Steam Gen SteamOutlet 2-2 (MS-501014)
Steam Gen Steam Outlet2-3 and Main SteamRelief Vlv. Hdr.(HS-501015)
Steam Gen Steam Outlet2-4 and Hain SteamRelief Vlv. Hdr.(HS-501016)
2K15-228-28V[2.2-17]Lead 1
2K15-227-28V[2.2-18]Lead 2
2K15-226-28 V
and2K15-1065-24 V
[2.2-20]Lead 3
2K15-225-28Vand2K15-1066-24 V
[2.2-19]Lead 4
PT/HTUT
12 One 17Line 228chosen astypical
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
.DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING-CIRCUM. WELDS C-FTABLE: 2.2PAGE
'
of 30
ATEGORY
ITEM
C-FC5.21
COMPONENT OR SYSTEM
PIPING - Continued
(C5.20) Circ'1 WeldsMultiple Streams,Continued
GENERAL NDE
IDENTIFICATION METH
~ Butt Welds
Cate or C-G
TOTALITEMS
EXAM EXTENTRE UIRED AMOUNT
40 YR 10 YR
EX N
PERIOD10 YR
YR TODATE
50')
EXAM RELIEF S
8I REMARKS
T- 843"
Stm Gen Feed WtrSupply Gen 2-1(FW-501023)
2K16-554-16V'ead
1
[2.2-21]
PT/MT 16
UT
(1)One 131)Three
Line 554chosen astypical.
Steam Gen Feed WtrSupply Gen 2-2( FW-501023)
2K16-555-16VLead 2[2.2-22] 2 Welds Encap
Steam Gen Feed WtrSupply Gen 2-3(FW-501023)
2K16-557-16 V
Lead 3[2.2-23]
Steam Gen Feed WtrSupply Gen 2-4
, (FW-501023)
2K16-556-16VLead 4[2,2-24]
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
JOR TEM: PIPING-CIRCUM. WELDS C-FTABLE: 2.2PAGE 0 3
C EGRITEM COMPONENT OR SYSTEM
PIPING - Continued
IDENTIFICATION METH
LITEMS RE UIRED AMOUNT
40 YR YR
PERIOD10 YR
YR TODATE
R E
5 REMARKS
C-FC5.21
C5.21
RHR Pp Inj Cold Leg2-9 25)2-9-24)2-9-23)2-10-16)
Pp 2-1 (. (
RHR Pp Inj Cold LegPp 2-2 (2-9-21)
RHR Pp 2-1 Inj ColdLeg Loop 1 (2-9-22)
RHR Pp 2-1 Inj ColdLeg Loop 2 (2-9-22)
RHR'Pp 2-2 Inj ColdLeg Loop 3 (2-9-21)
RHR Pp 2-2 Inj ColdLeg Loop 4 (2-9-21)
(C5.20) Circ'1 WeldsMultiple Streams,Continued
Butt Welds
Cate or C-G
2S6-508-8III[2.2-30][2.2-31][2 2-32]
2S6-509-BIII[2 2-33]
2S6-3844-6III[2.2-34]
2S6-3845-6III[2.2-34]
2S6-3846-6III[2.2-33]
2S6-3847-6III[2.2-33]
PTUT
PTUT.-
One
Two
(Sos)
16
(50')50
T=.812"
Line 508chosen astypical.
T=.718"Line 3844chosen astypical.
END OF ITEM C5.21
PGandE
TEN YEAR EXAHINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R ITEM: PIPING-LONGIT.—WELD C-FTABLE: 2.2PAGE 6 o 30
EG
E COMPONENT OR SYSTEM
C5.20 PIPIIIG - CONT'0
NE LIDENTIFICATION
N
METHL
ITEMSE N &
RE UIRED AMOUNT
40 YR 1 YR
Exam'n area meetsor exceeds req'tsof figureIWC-2520-7
PERIOD10 YR
YR TODATE
REL EF S
5 REMARKS
C-FC5.22 Longitudinal Welds
Over 1/2 In. WallSingle Stream Systems
Multiple StreamSystems
Single Stream Systems
Multiple StreamSystems
Steam Gen SteamOutlet 2-1 (MS-501013)
Steam Gen SteamOutlet 2-2 (HS-501014)
Lon 'l Seams
Cate or C-Femar s
Lon '1 Seamsate or
Remarks
Lon '1 SeamsCate or -G
emar s
Lon '1 Seams
Cate or C-G
2K15-228-28 V
[2.2-17]Lead 1
2K15-227-28V[2.2-18]Lead 2
PT or MTUT
UT
-NONE
NONE
NONE
'(50')
C5.22 ItemCat'y C-F S/SNot Applicable
C5.22Cat'y C-F H/S
Not Applicable
C5.22Cat.'y C-G S/SNot Applicable
Of One Stream,Typical.
T=1.002"Line 228chosen asTypical.
PGandE
TEN YEAR EXAMINATION PROGRAM
SHE SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING-LONGIT. WELD C-FTABLE:PAGE 0 3
C5,20C5.22
C5.30C5.31C5.32
COMPONENT OR SYSTEM
PIPING - CONT'D~Long Melds Cont'd.
Steam Gen SteamOutlet 1-3 (MS-501015)
Steam Gen SteamOutlet 1-4 (MS-501016)
Pipe Branch ConnectionCircumferential WeldsLongitudinal Welds
Single and MultipleStr. Sys.
N
IDENTIFICATION
Lon 'l Seamsate or - HS
2K15-226-28 V
[2.2-1g]Lead 3
2K15-225-28Y[2.2-20]Lead 4
Branch WeldsCate orate or
Remarks
NETH'TEMSEN
RE UIRED AMOUNT
40 R
PERIOD10 YR
YR TODATE
R
5 REMARKS
C5.31 orC5.32 ItemsCat'y C-F orC-G not appli-cable - Nobranch con-nection welds
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: PIPING-CIRCUM. WELDS C-FTABLE: 2. C5.10PAGE 0
C T R
ITEM
C-F
C5.11
C5.11
COMPONENT OR SYSTEM
Pressure RetaininWe s n in
C .Piping Wel ds
1/2" or Less NominalWall Thickness
Circumferential WeldsSingle Stream Systems
Loop 4 Hot Leg ToRHR Pps 2-10-21)
2-10-10)
NRLIDENTIFICATION
Butt Welds-F
2S1-927-14III[2.2-1]
ND
METH
PT
T LITEMS RE UIRED AMOUNT
4 R
Exam'n area meetsor exceeds req'tsof fig. IWC-2520-7
PERIOD10 YR
OneTwo
4YR TODATE
(100K)
1428
R L8 REMARKS
Res Ht Exchanger 2Outlet (2-10-5)
RHR Injection TOHot Leg 1 5 2 ( 2-10-15)
2-10-18)2-10-19)
Cent Charg Pps SuetHeader (2-8-14)
2S1-3551-14III[2 2-2]
2S1-985-12IIIP[2.2-3][2.2-4][2.2-5]
2S2-1456-8[2.2-7],
PT
PT
PT
21 21 2)
Three
OneTwoThree
One
33(lOOX)
101924
(100K)50
One weldinaccessible8 outboardcontainmentpenetration.
PGandf
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2 -PAGE
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: PIPING-CIRCUM. WELDS C-FTABLE: 2.2
9 of 30
T M COMPONENT OR SYSTEM IDENTIFICATION METH ITEMS RE UIRED AMOUNT
40 YR - 1 YR
PERIOD10 YR
YR TODATE
8( REMARKS.
C-FC5.11
PIPING - Continued~C.m) Circ'1 WeldsSingle Stream Systems
RHR Exchs BypassCross-Tie (2-10-2,3)
Residual Ht ExchsBypass Hdr (2-10-4,13)
RHR Exchs OutletCross-Tie Hx 2-2(2-10-14)
RHR Exchs OutletCross Tie Hx 2-1(2-10-15)
Butt Welds-F
2S1-1663-8III[2.2-8][2.2-9]
2S1-1661-BIII[2.2-101
2S1-1669-8[2.2-14]
2S1-2458-8[2.2-3]
PT
PT
PT
PT
, 18 14
15 15
9 9
3 3
4(2)1)
(1)
1)1)2)
OneTwo
'hree
OneTwoThree
OneTwoThree
One
(100K)142129
(lOOX)061325
(100')112233
(1005)33
4 Welds NotAccessible-WallPenetration
END S/S SYSTEM - C-F
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM'IPING-CIRCUM. WELDS C-FTABLE:PAGE 1 o
E COMPONENT OR SYSTEM IDENTIFICATION METH ITEMS RE UIRED AMOUNT
40 YR YR
PERIOD10 YR
YR TODATE
& REMARKS
C-FC5.11
C5.11
PIPING-Continued
Multiple StreamSystems
Residual Ht Rem Pp 2-.1Suction (2-10-9,10)
Residual Ht Rem Pp 2-2Suction (2-10-10,8)
Residual Ht Rem Pp 2-1Disch (10-2)
Residual Ht Rem Pp 2-2Dlsch (10-2)
Butt Welds
~CC-F2S1-110-14III[2.2-25]
2S1-111-14IIIP'2.2-6]
2S1-112-BIII[2.2-8]
2S1-113-8III[2.2-9]
PT
PT
17
16 16
21)1)
2)
OneTwo
OneTwoThree
1325
Line 110chosen asTypical.
(100K) Line 11206 chosen as13 Typical.25
(100')
Of One Stream(100K) Typical
C5.11 Residual Ht Exchanger2-1 Outlet (2-10-5,16)(Hx to Line 2-2458) .
Residual Ht Exchanger2-2 Outlet (2-10-12,6)(Hx to Line 2-1669)
2S1-118-BIII[2.2-26]
2S1-119-BIII[2 2-27]
PT 3( 1)1)1)
OneTwoThree
091827
Line 118chosen asTypical.
See CategoryC-G, page 14of 30 forbalance oflines 118and 119.
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING-CIRCUM. WELDS C-FTABLE: .2PAGE 11 o 30
CTE R
ITEM COMPONENT OR SYSTEM
GENER LIDENTIFICATION
N
METH
T LITEMS
EXTEN 5RE UIRED AMOUNT
40 YR
N
PERIOD10 YR
0YR TODATE
EX REL EF S
5 REMARKS
C-F
C5.11
C-FC5.11
PIPING-Continued~). TU)Multiple Streams,Continued
Cent Charg PmpSuet Pmp 2-1 (2-.8-13)
Cent Charg PmpSuet Pmp 2-2 (2-8-14)
Single Stream Systems
RWST To Res Ht Rem
Pps Suet (2-10-10,8)
Res Ht Rem To ChargPps Suet (2-10-5')
RHR Hdr. to Chg.Pps. Suet; (2-10-5)
Butt Welds
~CC-F2S2-42-6[2.2-35]
2S2-43-6[2.2-7]
Butt Welds-G
2S1-223-12IIIP[2.2-6]
2S2-734-8III[2.2-2]
2S1-1971-8III[2.2-2]
PT
PT
PT
PT
15 15
3 2
5 3
7 3
1)2)1)
OneTwoThree
One
Two
(100K)072129
(50')
33
33
Line 42chosen asTypical.
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: PIPING-CIRCUM. WELDS C-FTABLE: 2.2PAGE 0
'TGRITEM COMPONENT OR SYSTEM
GN L ND
IDENTIFICATION METHL
ITEMSE TEN
RE UIRED AMOUNT PERIOD10 YR
YR TODATE
E RLE5 REMARKS
C-FC5.11
PIPING-Continued~C. 10)Single Streams,. Cont.
RHR To'SIS Pp2-2 and)Cont Spr (2-10-11
RHR To Safety Injec.Pmp 2-2 (2-9-1,5)
Butt Welds-G
2S1-735-8IIIP[2.2-11]
2S2-1984-BIII[2.2-12]
PT
PT 12 6 2(lj
One
TwoThree
(50')25
1733
Safety Inj Pumps Suc.Hdr (2-9-1,4)
Charg Pps SuctionFrom RWST Vlv. B
(2-9-3)
Residual Heat Rem.To RWST (2-10-14)
2S2-1986-8[2.2-131
2S2-1988-8[2.2-28]
2S1-2212-8III[2.2-14]
PT
PT
PT
5*
1 1
Two 25
*Ref. Mult. Str.P.2.2-13 forbalance ofline 2-1988.
X-Tie Chg Pp & SI PpSuction (2-10-5)
RHR To Safety Injec.Pump 2-1 (2-9-2,6)
2S2-4296-6[2.2-2]
2S2-6 (6")[2. 2-16]
PT
PT
9 4
8 4
One
One
25
25
END S/S SYSTEMS C-G
PGandE
EN YEAR EXAMINATION PROGRAM
SHE SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEN: PIPING-CIRCUM. WELDS C-FTABLE: 2.2PAGE 13 of 30
C T R
C-FC5.11
COMPONENT OR SYSTEM
PIPING - CONT'D
~C5.1 )Multiple StreamSystems
IDENTIFICATION NETH ITEMS
Butt Welds
Cate or C-G
E N
RE UIRED AMOUNT
40 YR 1 YR
PERIOD10 YR
4YR TODATE
(50M)
R L81 REMARKS
Of One Stream,Typical
*Material "T"SCH 60=.406"
Steam Gen HSRV Riserand lol Atmos. Dump2-1'(HS-501013)
Steam Gen MSRV Riser2-2 (MS-501014)
Steam Gen HSRV Riser2-3 (HS-501015)
- Steam Gen MSRV Riser2-4 (HS-501016)
2K15-228-8V[2.2-17]
2K15-227-8V[2.2-18]
2K15-226-8V[2.2-19]
2K15-225-BV[2.2-2O]
PT or HT 6 Two 33
(50%)
28" Lead 1
Line 2-228chosen astypical
C5.11 Cont Sump To RHR PpsPmp 2-1 Suet (2-10-9,10)
Cont Sump To RHR PpsPmp 2-2 Suet (2-10-10,8)
2S1-512-14IIIP PT2*2749-14[2.2-25]
2S1-513-14IIIP2*2750-14[2.2-61
Two 13 Line 2-512chosen astypical
C5.11 Charg. Pps SuctionFrom RWST Vlv A(2-9-3)Charg Pps Suc. FromRWST Vlv.B (2-9-3)
2S2-1987-8.[2.2-28]2S2-1988-8[2.2-28]
PT
PT
Two(50')50
(Ref. Single StrP.2. 2-12)
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
M J R I EM: PIPING-CIR UM. ELDS C-FTABLE: 2.2PAGE 0
'
M
C-FC5.11
C5.11
5.11
COMPONENT OR SYSTEM
PIPING - Continued~C5.1 )Multiple Streams, Cont.
RHR Sup To SprayHdrs 1 5 3 (2-10-17)
RHR Sup To SprayHdrs 2 5 4 (2-10-11)
Residual Heat Exch'r1 Outlet (2-10-5,16)(Line 2-2458 to 2V-8809A)
Residual Heat Exch'r2 Outlet (2-10-12,6)(Line 2-1669 to 2V-8809B)
Safety Inj Pump Suc.Pump 2-1 (2-9-2,6)
Safety Inj Pump Suc.Pump 2-2 (2-9-1,5)
LIDENTIFICATION
Butt WeldsCate or C-G
2S1-279-8III[2.2-29]
2S1-280-BIII[2.2-11]
2S1-118-BIII[2.2-26]
2S1-119-BIII[2.2-27]
2S2-1982-6[2.2-16]
2S2-1983-6[2.2-12]
N
METH
PT
PT
PT
L
ITEMS
10
N
RE UIRED AMOUNT
40 YR 1 YR
PERIOD10 YR
One
Two
YR TO
DATE
(50<)
13
(50')
(50K)17
5 REMARKS
Line 2-279chosen astypical
Line 2-118chosen astypicalSee categoryC-F, pg. 10of 30 forbalance oflines 2-118 52-119
Line 2-1982chosen astypical
END OF ITEM C5.11
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING-L NGIT. WELDS C-FTABLE: 2.2PAGE 15 . of
ITEM = COMPONENT OR SYSTEM
NRL N
IDENTIFICATION METH
T L.ITEMS
N
RE VIREO AMOUNT
40 YR 1 R-
PERIOD10 YR
YR TODATE
E R L5 REMARKS
C-FC5.12
C5.12
PIPING = Continued
(C5.10)Longitudinal Welds<1/2" W.T.Single Stream Systems
Multiple StreamSystems
Lon '1 WeldsCate or C-Remar s
Lon '1 Weldsate or
None
Exam'n area meetsor exceeds req'tsof fig. IWC-2520-7
NOTE PAGE iFOR REMARKS-THIS TABSECTION
C5.12 ItemCat'y C-F S/SNot Applicable
(1005) Of One StreamComposite
C5.12
C5.12
Residual Ht Rem Ppl-1Discharge (2-10-2)
Residual Ht Rem Ppl-2Discharge (2-10-3)
Residual Ht Exchanger2-1 Outlet (2-10-5,16)
Residual Ht Exchanger2-2 Outlet (2-10-12,6)
1
(End Mult. Steam - C-F)
(End of Item C5.12)
2S1-112-8III[2.2-8]
2S1-113-8III[2.2-9]
2S1-118-8III[2.2-26]
2S1-119-8III[2.2-27]
PT
PT
1 1
Three
WIC-48LS Line2-112 chosenas typical
(1005)100 WIC-51LS Line
2-118 chosenas typical
C5.12 ItemCat'y C-G S/SNot applicable
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R M: PIPING-L NGIT. WELDS C-FTABLE: 2.PAGE 0 3
ITEM
C-D
C4. 20
COMPONENT OR SYSTEM
PIPING - ContinuedPressure RetainingBolting(Larger Than 2" Dia.)Bolts and Studs
IDENTIFICATION METH ITEMS RE 0 IRED AMOUNT
40 R 10 R
Remarks
PERIOD10 YR
YR TODATE
8I REMARKS
Category C-DItem C4.20(Piping) NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASHE SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON PONER PLANT-UNIT CMAJOR ITEN: PIPING - SUPPORTS
TA8LE: . 2PAGE i i of 30
Category C-C welded support attachments to the. pressure boundary (Items C3.40, C3.70, C3.100) arescheduled for surface examination when the base metal thickness of the welded attachment is 3/4"(.750) and greater (Table IWC-2500-1, Footnote 1). Category C-E includes all portions of allsupports including welded support attachments to the pressure boundary regardless of size.
The total amount of (C-C) applicable attachments to each system/component is noted adjacent tothe line number and scheduled accordingly.
Supports for valves (C3.100, C3.110, C3.120) are scheduled together with the corresponding pipe .
(C3.40, C3.50, C3.60) system. Supports for pumps (C3.70, C3.80, C3.90) are scheduled in Table 2.3,
For clarification of the examination area for category C-E, see section IWF-1300 of the Winter 1980Addenda of ASHE Section XI.
*ICE; Manger section totals are not current. This section will be re-vised to reflect the updated totals after the Reverification Modificationshave been completed,
PGandR
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
M JOR ITEN: PIPING - SUPPORTS
TABLE: 2.2 C-EPAGE 17 o 3
C TEGORY
ITEM COMPONENT OR SYSTEM
GENERALIDENTIFICATION
NDE
NETHTOTALITEMS
EXAMINATIONAMOUNT 5 EXTENT
EX N TO EXAM RELIEF S
PERIOD DATE 5 REMARKS
C-C
SUPPORTS
INTEGRALLY WELDED ATTACHMENTSPR S B R
Exam'n Area meetsor exceeds req'tsof fig. IWC-2520-5
This columnidentifiesattach't num-ber when app- .
licable tofootnote 1 ofIWC-2500-1category C-C
C3.40C3.70
C3.100C3.60-
C-E
C3.50C3.80C3.110C3.120
- Piping-- Pumps - (See table
,2.3)- Valves - (Remarks)- Remarks-
SUPPORT COMPONENTS
- Piping-- Pumps - (See Table 2.3)- Valves - (Remarks)- Remarks-
(Attach't)
(Supports) Note Comments onpage ii
Valve ItemsC3.100,C3.110and C3.120 arescheduled withpiping items.
Note: VT-4scheduled asapplicable toindividualcomponents
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POMER PLANT-UNIT 2
MAJOR E : PIPING - SUPPORTS
TABLE: 2.PAGE 1 o
ITEM COMPONENT OR SYSTEM L'DENTIFICATION METH
LITEMS
N
AMOUNT 5 EXTENT PERIOD DATER
5 REMARKS
~0
C-EC3.40C3.50
ont
Support Attach'tSupport Components
(C-F) SINGLE STREAM
Line No. 5TsSI .
SYSTEM REFERENCE
TO S-75 ONLY, NO
BEARING ON
SCHEDULED REQ'TS
- Applicable-
Seismic ConstrMark No. Meld No
C3.40C3.50
Loop 4 Hot Leg to RHR
Pps (2-10-21,10)2S1-927-14III[2.2-1]
PTVT-3(VT-4)
C-CC-E3 Supports 100K33
One
OneTwoThree
100C-E
9T62
100
C3.40C3.50
C3.40C3.50
C3.40C3.50
RHR Injection toHot Leg 1 5 22-10-15)2-10-18)2-10-19)2-9-31)
Cent Charg PpsSuet Header (2-8-14)
RHR Exchs BypassCross-Tie (2-10-2,3):
2S1-985-12IIIP[2.2-3][2.2-4]2.2-5]2S6-120-12)
2S1-1456-8[2 2-7]
2S1-1663-8III[2.2-8][2.2-9]
PTVT-3(VT-4)
VT-3
(-VT-4)
1
22C-CC-E
7 Supports 100K87
C-E1 Support 100K22
One
OneTwoThree
OneTwoThree
100
C-E32'4
100
C-E~0
60100
No SupportsIn Boundary
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT.-UNIT 2
MAJOR ITEM: PIPING - SUPPORTS
TABLE: 2. -fPAGE 1 o
CAT G RY;ITEM
C3.40C3.50
COMPONENT OR SYSTEM
contSupport Attach'tSupport Components((.Fi ~gl (Cont'd
GNRL 'DEIDENTIFICATION METH
Line No. 8
ISI DWG. No.
TL EAMINT N
ITEMS AMOUNT 5 EXTENTE N
PERIODT E R LIEF S
DATE 5 REMARKS
A licablear e
C3.40C3.50
C3.40C3.50
Residual Ht ExchsBypass Hdr (2-10-4,13)
Cent Charg PpsDisch Hdr. (2-8-18)
C-F Multi le Stream
2S1-1661-8III[2.2-10]
2S6-1454-6[2.2-i5]
PTVT-3(VT-4)
PTVT-3(VT-4)
1
12C-CC-E4 Supports 100%44
C-CC-E1 Support lOOX22
Two
OneTwoThree
One
OneTwoThree
100C-E
3X66
100
100C-E~0
70100
C3.40
C3.50
Residual Ht RemPp2-1 Suction(2-10-9)(2-10-10)
Residual Ht Rem
Pp2-2 Suction(2-io-io)(2-10-8)
2S1-110-14IIIP VT-3[2.2-25] (VT-4)
2S1-111-14IIIP VT-3[2.2-6] (VT-4)
C-E2 Supports 100K23-
C-E2 Supports 100K23
OneTwoThree
OneTwoThree
C-E~9
57100
C-E2957
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING - SUPPORTSTABLE: . C-PAGE 2 of 3
C TEG R
ITEM
C-C, -EC3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Components(C-F) Multi le Stream
cont'd
G NER LIDENTIFICATION
Line No. 5ISI DWG. NO.
NDE
METHTOTALITEMS
E AMIN TAMOUNT 5 EXTENT
EX N T EXAM REL EF S
PERIOD DATE Ec REMARKS
icable
C3.40
C3.50
C3.40
C3.50
Residual Ht RemPp2-1 Discharge(2-10-2)
Residual Ht Rem Pp2-2Discharge (2-10-3)
Residual Ht Exchanger2-1 Outlet(2-10-5,16)
Residual Ht Exchanger2-2 Outlet(2-10-12,6)
2S1-112-8III[2.2-8]
2S1-113-8III[2.2-9]
2S1-118-8III[2.2-26]
2S1-119-8III[2.2-27]
VT-3(VT-4)
VT-3(VT-4)
VT-3VT-4
VT-3(VT-4)
10
12
C-E1 Support 100K1
2
C-E1 Support lOOX1
1
C-E3 Supports lOOX3
C-E4 Supports 100K4
OneTwoThree
OneTwoThree
C-EOneTwoThree
OneTwoThree
C-EK50
100
C-E3366
100
3060100
C-E3S66
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PIPING — SUPPORTS
TABLE: .2PAGE 2 of
C TEGORY
ITEM COMPONENT OR SYSTEMGENER L NDE
IDENTIFICATION NETHTOT LITEMS
fXAHIN TI N
AMOUNT & EXTENTf 'NPERIOD
TDATE
EXAM R LI F S
& REMARKS
C3.40C3.50
C3.40
C3.50
C3.40C3.50
ontSupport Attach'tSupport Component(C-F) Multi le Stream
Cont
RHR fxchs OutletHX2-l Cross Tie(2-10-15)
RHR fxchs OutletHX2-2 Cross-Tie(2-10-14)
SIS to RCS Hot LegLoop 1 (2-10-19,31)
SIS to RCS Hot LegLoop 2 (2-10-19,31)
Line No. &
IS I DWG. NO.r
2S1-2458-8III[2 2-3]
2S1-1669-8IIIf2.2-14]
2S6-2575-8[2.2-5]
2S6-2576-8[2.2-5]
VT-3
(VT-4) =
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
C-E1 Support 100%
C-E1 Support lOOX1
2
C-E1 Support 100K1
1
C-E1 Support- 100K1
Three
OneTwoThree
OneTwoThree
OneTwoThree
C-EToo
C-EK50
100
C-E
66100
C-E~0100100
pp ca eHark WeldNo. No.
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R EM'IPING - SUPPORTS
TABLE: .2 - ,C-PAGE 2 o
EG R
ITEM COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component(C-F) Multi le Stream
Cont'ENERL NDE
IDENTIFICATION METH
Line No. &
ISI DW . No.
TAL EXANIN N
ITEMS AMOUNT & EXTENTEXAM N
PERIODXAM R L E S
DATE & REMARKS
>ca ear e
No. No.
C3.40C3.50
Cent Charge Pmp SucPmp 2-1 (2-8-13)
Cent Charg Pmp SuetPAlp 2-2 (2-8-14)
2S6-42-6[2.2-35]
2S2-43-6[2.2-7]
VT-3(VT-4)
VT-3(VT-4)
C-E1 Support 100K1
2
C-E1 Support 100K
One-TwoThree
One
C-E~5
50100
C-E55
C3. 40C3.50
RWST to Res Ht Rem
Pps Suet (2-10-10,8)2S1-223-12IIIP VT-3[2.2-6]
C-E 100K1 Support
Two C-E111
C3.40C3.50
C3.40C3.50
C3.40C3.50
Res Ht Rem to ChargPps Suet (2-10-5)
RHR to Charg PpsSuet (2-10-5)
RHR to SIS Pp2-2 andCont Spray (2-10-10,11)
2S2-734-8IIIP[2.2-2]
2S1-1971-8111[2.2-2]
2S1-735-BIII[2.2-11]
VT-3(VT-4)
VT-3(VT-4)
PT
VT-3(VT-4)
C-E1 Support1
C-E1 Support 100K1
C-C
C-E1 Support lOOX1
TwoThree
TwoThree
Two
OneTwoThree
C-E555
100
C-E555
100
C-CTOr
C-E55
100100
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R: PIPING - SUPP RTS
TABLE: . - , C-EPAGE 2 o
C E R
ITEM
C-C, -EC3.40C3.50
COMPONENT OR SYSTEM
ContSupport Attach'tSupport Components(C.G) ~B 1 St
GNR ND
IDENTIFICATION METH
Line No. &
~s
L E N
ITEMS AMOUNT & EXTENT PERIODR
DATE & REMARKS
cablear e
Tfo,0.
C3.40 RHR to Safety Injec-C3.50 . tion Pmp 2-2 (2-9-1,5)
2S1-1984-8III[2.2-12] VT-3
(VT-4)C-E
.2 Supports 1005 One2 Two3 Three
C-E333
60100
C3.40C3.50
C3. 40C3;50
C3.40C3.50
C3.40C3.50
Safety Inj PumpsSuction Hdr (2-9-1,4)
Residual Heat Rem toRWST (2-10-14)
Charging Pumps DischEmerg (2-9-37,2-8-18)
Boron Injection TankInlet (2-9-37,2-8-18)
2S2-1986-8[2.2-13]
2S1-2212-8[2.2-14]
2S6-1973-6[2.2-15]
2S6-2032-6III[2.2-15]
VT-3(VT-4)
VT-3(VT-4)
VT-3(VT-4)
PTVT-.3(VT-4)
C-E1 Support 100K1
C-E1 Support 100K
C-E1 Support 100K
C-CC-E1 Support lOOX1
1
TwoThree
Two
Thr ee
One
OneTwoThree
C-E55
100
C-ETGr
C-ETK
100C-E3366
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
JOR TEM'IPING — SUPPORTS
TABLE: 2.2 C-C C-EPAGE 2 o 3
G R
ITEM
C3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component(I-G( ~R I StCont'd
GENE L ND
IDENTIFICATION METH
Line No. 8
IISIOG ~ GO ~
L E INTI N
ITEMS AMOUNT & EXTENT
R LEPERIOD DATE & REMARKS
ca ear. e
Ko. No.
C3.40C3.50
C3.40
C3.50
X-Tie Chg Pp & SI PpSuction (2-10-5)
RHR to Safety Injec-tion Pump 2-1
(2-g-2,6)
2S2-4296-6[2 2-2]
2S2-6[2.2-16]
VT-3(VT-4)
PTVT-3(VT-4)
C-E1 Support 100%1
1 C-C 100K1 C-E
1 Support 100K
OneTWO
Three
One
C-E~0100
C-CTtm .
C-ETK
C3.40C3.50
(I-G( ~ll It( I St
Steam Gen SteamOutlet 2-1 (MS-501013)
Steam Gen SteamOutlet 2-2 (MS-501013)
2K15-227-28V[2,2-18]Lead 2
PTor MT 1
VT-,3 11.(VT-4)
2K15-228-28V, PT ov MT 1
[2 2-17] VT-3 10Lead 1 (VT-4)
C-CC-E3 Supports 100K3
C-CC-E4 Supports 100K43
One
OneTwoThree
Two
OneTwoThree
C-C~0C-E3560
100C-C100C-E
3570
100
. PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT
2'AJOR
I EM: PIPING - SUPPORTS
TABLE'AGE- 25 o 3
ITEM COMPONENT OR SYSTEMGEN ND
IDENTIFICATION METHL E N N
ITEMS AMOUNT 8t EXTENT PERIODR LIE
DATE 5 REMARKS
C-CC-EC3.40C3.50
C3.40C3.50
C3.40C3.50
Cont'dSupport Attach'tSupport Component(C-G) Multi le Stream
Cont'team
Gen SteamOutlet 2;3 (MS-501015)
Steam Gen SteamOutlet 2-4 (MS-501016)
Hain Stm Relief Vlv.Hdr. 2-3 (HS-501015)
h1ain Stm Relief Vlv.Hdr. 2-4 (MS-501016)
Line No. 8
T550~G. fa.
2K15-226-28 V
I 2.2-19]Lead 3
2K15-225-28 V
[2.2-20]Lead 4
2K15-1065-24 V
I 2.2-19]Lead 3
2K15-1066-24Vl2.2-20]Lead 4
PT or HTVT-3VT-4
PT or Mt 1VT-3 - 10(VT-4)
VT-3(YT-4)
PT or MTVT-3(VT-4)
C-CC-E3 Supports 100%33
C-CC-E3 Supports 100K3
C-E2 Supports lOOX1
1
C-CC-E1 Supports lOOX22
Three-
OneTwoThree
Three
OneTwoThree
OneTwoThree
One
OneTwoThree
C-C100C-E3Y66
100
100C-E
3060
100
C-E5575
100C-C1RC-Em60
100
A 1 i cableHar e%o. Tlo.
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR TEM: PIPING - SUPPORTS
TABLE:PAGE 2 o
R
ITEM
-CC3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component
C-G) Multi le StreamCont'
N
IDENTIFICATION METH
Line No. &
IS I DWG. No.
LITEMS AMOUNT & EXTENT PERIOD DATE & REMARKS
>ca ear e
No. No.
C3.40C3.50
Stm Gen Feed WtrSupply Gen 2-1(FW-501023)
2K16-554-16 V
[2.2-21]Lead 1
PT or M
VT-3(VT-4)
17'-CC-E3 Supports 100K22
Thr ee
OneTwoThree
100C-E
40'0
100
Steam Gen Feed WtrSupply Gen 2-2(501023)
Steam Gen Feed WtrSupply Gen 2-3(501023)
2K16-555-16 V
[2.2-22]Lead 2
2K16-557-16 V
[2.2-23]Lead 3
PT or M
VT-3(VT-4)
PT or M
VT-3(VT-4)
r
C-CC-E3 Supports 100K22
C-CC-E2 Supports 100K32
Three
OneTwoThree
Three
OneTwoThree
100C-E~0
70100
100C-E3570
100
Steam Gen Feed WtrSupply Gen 2-4(501023)
2K16-556-16Y[2.2-28]Lead 4
PT or M
YT-3(YT-4)
C-CC-E3 Supports lOOX22
Three
OneTwoThree
100C-E
3666
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM'IPING — SUPPORTS
TABLE: 2.2 C-C C-EPAGE 2 o
C E RY
ITEM
C3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component
C-G) Multi le StreamCont'NL ND
IDENTIFICATION METH
Line No. 8
ISI DWG. No.
LITEMS
E IN N
AMOUNT 5 EXTENTN
PERIOD DATE
sca ear e
Ro.No.
E RLEFS5 REMARKS
C3.40C3.50
C3.40
C3.50
Cont Sump to RHR PpsPmp 2-1 Suet (2-10-9,10)
Cont Sump to RHR PpsPmp 2-2 Suet (2-10-10,8)
Charg Pps SuctionFrom RWST Vlv. A (2-9-3)
2S1-512-14III[2.2-15]
2S1-513-14III[2.2-6]
2S2-1987-8[2.2-28]
VT-3 .
(VT-4)
VT-3'VT-4)
VT-3(VT-4)
C-E1 Support 100K1
2
C-E1 Support 100%1
2
C-E1 Support 100%
One.TwoThree
OneTwoThree
OneTwoThree
C-E~5
50100
C-E2550
100
C-E
50100
Charge Pps Suctionfrom RWST Vlv 8 (2-9-3)
2S2-1988-8[2.2-28] VT-3
(VT-4)C-E1 Support Two
C-E111
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2V
DIABLO CANYON POWER PLANT-UNIT 1
J R I M' PING - SUPPORTS
TABLE: . C- ,-PAGE 2 of
EG R
ITEM
C,-C3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component(C-G) ~N1ti 1 StCont'd
G N LIDENTIFICATION
Line No. 8
a.
T L N I N
METH . ITEMS AMOUNT 8 EXTENT PERIODE L
DATE 5 REMARKS
cab ear e
halo. Tlo.
C3.40C3.50
C3.40C3.50
RHR Sup to SprayHdrs 1 8 3 (2-10-17)
RHR Sup to SprayHdrs 2 5 4 (2-10-10,11)
RHR Pp Inj Cold LegPp 2-1(2-9-23,24,25)
(2-10-16)
RHR Pp Inj Cold LegPp 2-2 (2-9-21)
(2-10-2)
2S1-279-8IIIP[2.2-29]
2S1-280-8IIIP[2.2-11] .
2S6-508-8III[2,2-30][2.2-31][2.2-32]
2S6-509-8III[2 2-33]
PTVT-3(VT-4)
PTVT-3(VT-4)
PTVT-3(VT-4)
PTVT-3(VT-4)
228
1
8
C-CC-E3 Supports 100K35
C-CC-E2 Supports 100%33
C-CC-E9 Supports lOOX9-Supports10
C-CC-E2 Supports 100$33
One
OneTwoThree
Two,
OneTwoThree
Three
OneTwoThree
One
OneTwoThree
100C-E2755
100
100C-E
333'0
100
100C-E
3F64
100
100C-EK63
100
Valve C3.110Item
PGancfE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
J R : P P NG - SUPP RTS
TABLE: . 2.2 C- -EPAGE
'
o
TEG R
ITEM
C3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component(C-Bl ~M1 i 1 StCont'd
G N LIDENTIFICATION
Line No. &~5I GII .
NO'DEMETH
TL INT N
ITEMS AMOUNT & EXTENTE N
PERIODE RLEFS
DATE & REMARKS
>ca ear We
No. No.
C3.40
C3.50
RHR Pp 2-1 Inj ColdLeg Loop 1
(2-9-22)2S6-3844-6III[2.2-34]
PTVT-3
C-CC-E2 Supports23
100K OneTwoThree
C-E
57100
RHR Pp 2-1 Inj ColdLeg Loop 2(2-9-22)
RHR Pp 2-1 Inj ColdLeg Loop 3(2-9-21)(2-10-12)
2S6-3845-6III[2.2-34]
2S6-3846-6III[2.2-33]
VT-3(VT-4)
C-E3 Supports 100K One3 Two2 Three
C-EK70
100
No SupportsIn Boundary
RHR Pp 2-1 Inj ColdLeg Loop 4(2-9-21)(2-10-12)
2S6-3847-6III[2.2-33] VT-3
(VT-4)C-E1 Support 100K1 Support
OneTwo
C-E50
100
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POMER PLANT-UNIT 2
M J R: PIPING.- SUPP RTSTABLE:PAGE 3 of 3
R
ITEM
C3.40C3.50
COMPONENT OR SYSTEM
ontSupport Attach'tSupport Component(C-G) ~ll ltd 1 ICont'd
IDENTIFICATION METH
Line No. 8T550. NO.
ITEMS AMOUNT 5 EXTENT PERIOD DATE 5 REMARKS
ca ear Me
0 ~0
C3. 40C3.50
Safety Inj PumpSuction Pump 2-1(2-9-2,6)
2S2-1982-6[2.2-16]
PTVT-3(VT-4)
1
2C-CC-E1 Support 100K1
One
OneTwo
C-CTKC-E~0100
Safety Inj PumpSuction Pmp 2-2(2-9-1,5)
2S2-1983-6[2.2-12]
PTVT-3(VT-4)
C-CC-E1 Support 100$11
Two
OneTwoThree
C-EK66
100
C-CTOr
END OF ITEM C3.40 AND 3.50
PGandE
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJ R ITEM: PUMPS
TABLE: 2.3 RHR PUMP
PAGE .1 of
CATEGORY
ITEM COMPONENT OR SYSTEM
GENERALIDENTIFICATION
NDE
NETH
TOTALITEMS
EXAMINATIONAMOUNT 8. EXTENT
EX N TO EXAM RELIEF S
PERIOD DATE 8 REMARKS
C-G
C6.10'-D
C4.30
C-CC3.70
Table IWC-2500-1Sub-ItemOut of SequenceIntentionally(Each Pump isDescribed CompletelyBefore the NextPump is Described)
Residual Heat
ressure etainingWeldsPump Casing Welds
Pressure RetainingBolting(Larger than 2 inchd)a.)
Integrally WeldedSupport Attachments(To PressureBoundary)
DWG. REF.DC-663217-26* [ 2.3-1 ]- Remarks-
-'emarks-
- Remarks-
[*] ISI DWG
Page No.
(Serial No.'s)
2-1 0370492-2, A69-35
C6.10 Items NotApplicable
C4.30 Item NotApplicable
C3.70 Item NotApplicable
C3.80 Support Components
RHR Pump 2-1RHR Pump 2-2
Support Plates
Plate 2-1Plate 2-2
VT-3VT-3
(2)
- Exposed Areas - One- Exposed Areas - Two
100100
The RHR PumpsAre Resting OnA PlateImbedded In TheDeck
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
C TEG RY
ITEM COMPONENT OR SYSTEM
GENE L 0IDENTIFICATION METH
M JR TM:TABLE:PAGE 2
PUMPS
R
T TALITEMS
X IN TI N
AMOUNT & EXTENT PERIOD DATEE R EF& REMARKS
C-EC3.90
C-G
C6.10
C-DC4.30
C-C
C3.70
SupportsMechanical andHydraulic Snubbers
Safet In 'ection~Pum sPressure RetainingWeldsPump Casing Welds
Pressure RetainingBolting (LargerThan 2-inch Dia.)
SI Pump 2-1(Ser. No. 45489)*
OR
SI Pump 2-2(Ser. No. 45500)*
Integrally WeldedSupport Attachments
(To PressureBoundary)
- Remarks-
DWG. REF.
+ [ 2.3-2 ]
- Remarks-
Casing Bolts
- Remarks-
UT All Bolts 100K(number 5 ondwg. 2-3-2)
"Depen- 100dent onMainten-anceScheduleDue toDesign
C3.90 Item NotApplicable
[*] ISI DWG.
Page No.
C6.10 Item NotApplicable
Relief No. 009Dia. = 2.12"
C3.70 Item NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2
QDIABLO CANYON POWER PLANT-UNIT 2
M J R M: PUMP SI PUMPS
TABLE: 2.3PAGE 3 o 5
R
ITEM COMPONENT OR SYSTEMN D
IDENTIFICATION METH
L N N
ITEMS AMOUNT 8t EXTENT PERIODE R
DATE 5 REMARKS
C-CC3.80 Support Components
SI Pump 2-1SI Pump 2-2
Support BaseBase 2-1Base 2-2
VT-3VT-3
(2)1
1
Exposed AreasExposed Areas
OneTwo
100100
The SI pumpsare restingon concretefoundations
C3.90
C-G
C6.10
SupportMechanical andHydraulic Snubbers
~Cif 1 ~Ch
~Pum sPressure RetainingWel dsPump Casing Welds
Cent'1 Pmp 2-1(Ser. No. 45617)
OR
Cent'l Pmp 2-2*(Ser. No. 45618)
- Remarks-
DWG. REF.DC-663210-146
* [ 2.3-3 ]
Branch Weld toUpper Case
[ 2.2-3 ]
PT -Remarks-360'eld
N-A
-Remarks-
360'wo
100
C3.90 Item NotApplicable
[*] ISI DWG.
Page No.
Mfg. DresserPacific Pumps
Suction SideSix inch 1508Flange
Exam. req'd onone pump
C6.10 Cent'1 Pmp 2-1 or2-2* Machined Weld PT
nve en o
pump casing
1 One Weld 100$ Depen- 100dent onMain-tenanceScheduleDue toDesign
Relief No. 010
PGandE
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 2TABLE:PAGE
DIABLO CANYON POWER PLANT-UNIT 2
PMS N
4 o
ITEM COMPONENT OR SYSTEM IDENTIFICATION METHL
ITEMS AMOUNT & EXTENT PERIO DATE & REMARKS
C-DC4.30
C-CC3.70
'ressure Retaining(Larger than 2 inchDia.)
Integrally WeldedSupport Attachments(To Pressure Boundary)
Cent'1 Pmp 2-1
Cent'l Pmp 2-2.
[ 2.3-3 ]
WeldedAttach't
Items 1-4
Items 1-4
PT or MT
PT or MT
4 Attach'ts 100$
4 Attach'ts lOOX
One
100K)
50
Three 100
C4.30 Item NotApplicable
-E3.80
3.90
Support Components
Cent'1 Pmp 2-1
.Cent'1 Pmp 2-2
SupportMechanical andHydraulic Snubbers
Support Base
Base 2-1
Base 2-2
- Remarks-
VT-3
VT-3
(2)
1 Exposed Areas One 50
The Cent'l PmpsAre Resting On
ConcreteFoundations
C3.90 Item NotApplicable
PGandE
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
MAJOR ITEM: PUMPS RECIP'G CHARG
TABLE: 2.3PAGE 5 o
C TEG RY
ITEM COMPONENT OR SYSTEMGENE L
IDENTIFICATION METHT TALITEMS
INT N
AMOUNT 5 EXTENTT EAMR LIEF S
PERIOD DATE 5 REMARKS
C-GC6.10
C-D
C4.30
C-CC3.70
C-E,C3.80
C3.90
Reci rocatinar in
~Pum -3)
Pressure RetainingPump Casing Welds
Pressure RetainingBolting(Larger than 2 inchDia.)
Integrally WeldedSupport Attachments(To Pressure Boundary)
Support Components
Recipr'g Pmp 2-3
SupportMechanical andHydraulic Snubbers
DC-663210-143
* [ 2.3-4 ](Ser.No.274174)
- Remarks-
- Remarks-
- Remarks-
Support Base
Base 2-3
- Remarks-
VT-3
See FootnotesPage 1, ThisSection
Exposed Areas Two ~
L*] ISI DWG.
Page No.
C6.10 Item NotApplicable
C4.30 Item NotApplicable
C3.70 Item NotApplicable
The Recip'g Pmpis Resting On
100 ConcreteFoundation
C3.90 Item NotApplicable
7
PGandE
TEN YEAR EXAMINATION PROGRAM
ASHE SECTION XI SYSTEMS-CLASS 2
MAJOR ITEN:TABLE:PAGE
DIABLO CANYON POWER PLANT-UNIT 2
VALVES2.
CTGRITEM COMPONENT OR SYSTEM
GENERAL NOE
IDENTIFICATION METHT L IN N
ITEMS AMOUNT 5 EXTENT PERIOD DATEE RLE S
5 REMARKS
C-GC6.20
C-DC4.40
C-CC3.100
C3.120
Table IWC-2500-1 SubItem Out Of SequenceIntentionally
Pressure RetainingWelds Valve BodyWelds
Pressure Retaining'olting(Larger than
2-inch dia.)
Integrally WeldedSupport Attachments(To Pressure Boundary)
SupportsMechanical andHydraulic Snubbers
* [ Remarks ]
- Remarks-
- Remarks-
- Remarks-
- Remarks-
~ ISI DWG's Contain Data Re-lating to Valise SupportComponents, Valve BoltingDimensions, and Identification
C6.20 Item NotApplicable
C4.40 Item NotApplicable
C3.100, C3.110 and C3.120 Code Items are Summarizedunder Tab Section 2.2 and included with their re-spective Piping Systems under Code Items C3.40,C3.50 and C3.60. Table 2.2 describes the supportamounts by line number and nomenclature. All supportsare scheduled per Code requirements.
PGandE DIABLO,CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C; COMPONENT SUPPORTS (ALL TYPES)
PAGE i of 7I
Category D-A, D-B, and D-C component support members are itemized by
line number and number of supports on the line"according to system in descending size
order. Support totals for all applicable Class 3 lines over 4 inch nominal diameter are
given. A visual examination, VT-3 (and VT-4 as applicable) will be given each support
once each inspection period (3 1/3 years) per Table IWD-2500-1 of Section XI.
NOTE: Hanger totals are not current . This section will be revised to reflectupdated totals after the Reverification Modifications are completed.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)
PAGE 1 of 7
COMPONENT OR SYSTEM
P&ID 104628CO-ORD.
PGandE REF. DWG.
NO.NDE
METHOD
EXAM RELIEFSAND REMARKS
AUXILIARY FEEDWATER PUMP
2-12-22-3
LETDOWN HEAT EXCHANGER
2-1
33C33B33A
313C
DC-66305624,25
DC-663210-11
VT-3VT-3VT-3
VT-3
Pumps rest on 4 integrallegs to base pad.
Vessel has 2 supportsto base.
SEAL WATER HEAT EXCHANGER
2-1 311C DC-663210-7 VT-3 Vessel has 2 supportsto base.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)
PAGE 2 of 7
COMPONENT OR SYSTEMPAID 104628CO-ORD.
PGandE REF. DWG.
NO.
NDE
METHOD
EXAM RELIEFSAND REMARKS
RESIDUAL HEAT REMOVAL PUMP
SEAL WATER COOLER2-1
2-2
2110,325C2110,271C
DC-663217-9,16 VT-3
VT-3
Coolers have bracket toRHR PP.
SPENT FUEL PIT HEAT EXCHANGER
2-1 316C DC-663211-7 VT-3 Vessel has 2 supports tobase.
COMPONENT COOLING WATER
SURGE TANK2-1 257B DC-663225-2 VT-3 Tank has 2 braced supports
to base.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)
PAGE 3 of 7
COMPONENT OR SYSTEM
PAID 104628CO-ORD.
PGandE REF. DWG.
NO.NDE
METHOD
EXAM RELIEFSAND REMARKS
COMPONENT COOLING WATER PUMP
2-1
2-2
2-3
262C
264C
266C
DC-663213-1 VT-3
VT-3
VT-3
Pumps have 4 integrallegs to base.
COMPONENT COOLING WATER HEATEXCHANGER
2-1
2-2
257E, 356C
2570, 357C
DC-663212-1, 2 VT-3
VT-3
Vessels have 2 supportsto base.
COMPONENT COOLING WATER PUMP
LUBE OIL COOLER2-1
2-2
2-3
263C
265C
267C
DC-663213-4 VT-3
VT-3
VT-3
Coolers mounted to pumps.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)
PAGE 4 of 7
COMPONENT OR SYSTEMP&ID 104628CO-ORD.
PGandE REF. DWG.
NO.NDE
METHOD
EXAM RELIEFSAND REMARKS
CENTRIFUGAL CHARGING PUMP LUBEOIL, GEAR OIL AND SEAL COOLERS
2-1
2-2
321C
273C
DC-663210-40,47,50 VT-3
VT-3
Cooler brackets mount topumps.
SAFETY INJECTION PUMP LUBE OILAND SEAL COOLERS
2-1
2-2
275C
326C
DC-663216-26,32 VT-3
VT-3
Cooler brackets mount topumps.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)PAGE 5 of 7
COMPONENT OR SYSTEM
P8I ID 104628CO-ORD.
PGandE REF. DWG.
NO.
NDE
METHOD
EXAM RELIEFSAND REMARKS
REACTOR CONTAINMENT FAN COOLERS
AND MOTOR HEAT EXCHANGER
2-1
2-2
2-3
2-5
279C
278C
329C
328C
277C
DC-663079-1,2,5,9 VT-3
VT-3
VT-3
VT-3
VT-3
Examined as accessible.
RECIPROCATING CHARGING PUMP
FLUID DRIVE 5 LUBE OIL COOLERS
2-3 288C DC-663210-25 VT-3 Coolers are mounted topump.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)PAGE 6 of 7
COMPONENT OR SYSTEM
PE ID 104628CO-ORD.
PGandE REF. DWG.
NO.
NDE
METHOD
EXAM RELIEFSAND REMARKS
REACTOR COOLANT PUMP
UPPER BEARING OIL COOLERS
2-1
2-2
2-3
2-4
294D
290D
292D
2930
DC-663207-4,6 VT-3
VT-3
VT-3
VT-3
Cooler mount To bracketsAt Top of R.C. Pumps.
CONDENSATE STORAGE TANK
2-1 332D DC-663071-27 VT-3 Base of tank rests onconcrete foundation.
FIREWATER TRANSFER TANK
0-1 338D 438038 VT-3 Base of tank rests onconcrete foundation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: COMPONENT SUPPORTS (ALL TYPES)
PAGE 7 of 7
COMPONENT OR SYSTEMPAID 104628CO-ORD.
PGandE REF. DWG.
NO.NDE
METHOD
EXAM RELIEFSAND REMARKS
MAKE-UP WATER TRANSFER PUMPS
0-1
0-2
333B
335B
DC-663062-3 VT-3
VT-3
Pump mount on bed plate.
AUXILIARY SALT WATER PUMPS
2-1
2-2
354C
354C
DC-663030-1 VT-3
VT-3
Pump mount to deck.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)PAGE 1 of 11
COMPONENT OR SYSTEM LINE NO.P EE ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDEMETH ¹ OF SUPPORTS
FEEDWATER SYSTEM - SYS 03
AUX FW PP 2-1 SUCTION
AUX FW PP 2-1 RAW WTR SUCT
AUX FW PPS 2 + 3 CNDS SUCT HDR
AUX FW PP 2-2 SUCTION
AUX FW PP 2-3 SUCTION
AUX FW PP 1 DISCH HDR
AUX FW PP 2-2 RAW WTR SUCT
AUX FW PP 2-3 RAW WTR SUCT
AUX FW PPS RAW WTR SUCT HDR.
2K-558-8
2K-561-8
2K-562-8
2K-559-6
2K-560-6
2K16-568-6
2K-488-6
2K-489-6
2K-638-8
31C
30B
30B
31B
30A
33C
31B
31A
31A
447118
447118
447118
447118
447118
445878
447118
447118
447118
*VT-4As Appl.
VT-3
VT-3
VT-3
VT-3
VT-3
VT-3
VT-3
None
None
TURBINE STEAM SUPPLY SYSTEM - SYS 04
AUX FEED PP 2-1 TURB EXH 2K-1045-10 63C 447119 VT-3,VT-4
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)
PAGE 2 of 11
COMPONENT OR SYSTEM LINE NO.P 8( ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDE
METH b OF SUPPORTS
COMPONENT COOLING WATER SYSTEMSYS 14
CCW HT EXCH 1 CCW INLET
CCW HT EXCH 2 CCW INLET
CCW HT EXCH 1 CCW OUTLET
CCW HT EXCH 2 CCW OUTLET
CCW HT EXCH OUTLET CROSSTIE
CCW RETURN HEADER A
CCW RETURN HEADER B
COMP CLG PP 1 DISCH
COMP CLG PP 2 DISCH
COMP CLG PP 3 DISCH
CCW PP'S 2-2 & 2-3 SUCTCROSSTIE
CCW SUPPLY HEADER A
2K-95-30
2K-96-30
2K-101-30
2K-102-30
2K-98-24
2K-81-20
2K-82-20
2K-89-20
2K-90-20
2K-91-20
2K-97-20
2K-103-20
253-E
253-D
258-E
258-D
258-E
254A,262A,277A,281A,291A,304A,311A,322A
254A,262B,270B
251-E
252-E
254-E
252-C
259E,263E,272E,281E,291E,304E,311E,322 E
449316
449316
449316
449316
449316
449316449314
449316449314
449316
449316
449316
449316
449316449314
VT-3,VT-4
VT-3,VT-4
VT-3
VT-3
VT-3,VT-4
VT-3,VT-4
VT-3
VT-3
VT-3
VT-3,VT-4
20
None
13
None
10
PGandh DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)
PAGE 3 of 11
COMPONENT OR SYSTEM LINE NO.P 81 ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDEMETH ¹ OF SUPPORTS
CCW SUPPLY HDR B
CCW SUPPLY HDR C
CCW RETURN HDR C
CCW PP'S 2-1 8I 2-2 SUCTCROSSTIE
COMP CLG PP 1 DISCH HDRS A 8 B
COMP CLG PP 2 DISCH HDRS A 8I B
CONT FAN CLR CCW SUP HDR B
CONT FAN CLR CCW RET HDR B
CCW SUPPLY HDR C
CCW RETURN HDR C
CCW RETURN HEADER B BYPASS
2K-104-20
2K-2277-20
2K-2282-20
2K-2285-20
2K-2994-20
2K-3036-20
2K-105-18
2K-106-18
2K-2278-18
2K-2281-18
2 K-2369-18
259D,263D,270D
259D,273E,270E,281E,291E
254A,263B,2778,280B,291A
251C
251E
253E
272D
271B
296E,304E,311E
293A,304A,311A
276B
449316449314
449315449316
449315449316
449316
449316
449316
449314
449314
449315
449315
449314
VT-3
VT-3
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3
VT-3,VT-4
VT-3,VT-4
None
None
13
13
PGandf DIABLO CANYON POWER PLANT-UNIT 2
fN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)PAGE 4 of 11
COMPONENT OR SYSTEM LINE NO.P 8 ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDfMETH jj OF SUPPORTS
CONT FAN CLR SUPPLY HDR A
CONT FAN CLR RETURN HDR A
CCW RETURN HEADfR A BYPASS
RHR HT EXCH 2 CCW SUPPLY
RHR HT EXCH 2 CCW RETURN
RHR HT EXCH 1 CCW SUPPLY
RHR HT EXCH 1 CCW RETURN
SPENT FUEL HT EXCH CCW SUP
SPENT FUEL HT EXCH CCW RET
CCW SUPPLY HDR C
CCW RETURN HDR C
CONT FAN CLR 5 CCW SUPPLY
2K-146-16
2K-147-16
2K-2399-16
2K-94-12
2K-99-12
2K-124-12
2K-127-12
2K-152-12
2K-153-12
2K-2279-12
2K-2280-12
2K-3279-12
324f
324A
326B
270D,203C
270B,203C
324D,203E
324B,204E
316D
316C
316E
316B
277D
449314
449314
449314
449314
449314
449314
449315
449315
449315
449315
449315
446503
VT-3,VT-4
VT-3,VT-4
VT-3
VT-3
VT-3,VT-4
VT-3
VT-3
VT-3
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)
PAGE 5 of 11
COMPONENT OR SYSTEM LINE NO.P 8I ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDEMETH AE OF SUPPORTS
CONT FAN CLR 4 CCW SUPPLY
CONT FAN CLR 3 CCW SUPPLY
CONT FAN CLR 2 CCW SUPPLY
CONT FAN CLR 1 CCW SUPPLY
CONT FAN CLR 5 CCW RTRN
CONT FAN CLR 4 CCW RTRN
CONT FAN CLR 3 CCW RTRN
CONT FAN CLR 2 CCW RTRN
CONT FAN CLR 1 CCW RTRN
CONT FAN CLR 5 CCW SUPPLY
CONT FAN CLR 4 CCW SUPPLY
CONT FAN CLR 3 CCW SUPPLY
CONT FAN CLR 2 CCW SUPPLY
2K-3280-12
2K-3281-12
2K-3282-12
2K-3283-12
2K-3284-12
2K-3285-12
2K-3286-12
2K2-3287-12
2K2-3288-12
2K2-314-12
2K2-315-12
2K2-316-12
2K2-317-12
327E
328E
278D
279D
277B
327A
328A
278B
279B
2770
327D
328D
278D
446503
446503
446503
446503
446503
446503
446503
446503
446503
446491446503
446491446503
446492446503
446493446503
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
None
12
13
16
PGandE DIABLO CANYON POWER PLANT-UNIT 2
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B,'D-C: PIPING SUPPORTS (ALL TYPES)
PAGE 6 of ll
COMPONENT OR SYSTEM LINE NO.P 8 ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDE
METH 0 OF SUPPORTS
CONT FAN CLR 1 CCW SUPPLY
CONT FAN CLR 5 CCW RETURN
CONT FAN CLR 4 CCW RETURN
CONT FAN CLR 3 CCW RETURN
CONT FAN CLR 2 CCW RETURN
CONT FAN CLR 1 CCW RETURN
REAC COOL PPS CCW SUP HDR
BA 5 WASTE CONC CCW SUP HDR
BA 5 WASTE CONC CCW RET HDR
RC PPS CCW SUPPLY HDR
2K2-318-12
2K2-319-12
2K2-320-12
2K2-321-12
2K2-322-12
2K2-323-12
2K-133-10
2K-148-10
2K-149-10
2K2-3007-10
299D
297C
347B
348B
298C
299C
312E
322D
322B
312E
466494466503
466491446503
446491446503
446492446503
446493446503
446494446503
445876449315
451411
451411
445876
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3
VT-3,VT-4
VT-3,VT-4
18
13
12
12
16
19
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)PAGE 7 of 11
COMPONENT OR SYSTEM LINE NO.P 8I ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDE
METH ¹ OF SUPPORTS
REAC COOL PPS CCW SUP HDR
WASTE CONC CCW RTRN HDR
WASTE CONC CCW SUPPLY HDR
LTDN HT EXCH CCW SUPPLY
LTDN HT EXCH CCW RTRN
WASTE CONC CCW SUPPLY HDR
WASTE CONC CCW RTRN HDR
RC PUMPS CCW SUP HDR
BA CONC CCW SUP HDR
BA CONC CCW RTRN HDR
COMP CLG WTR PP 1 RECIRC
2K-180-10
2K-1951-10
2K-2207-10
2K-125-8
2K-126-8
2K-150-8
2K-151-8
2K-2296-8
2K-2312-8
2K-2341-8
2K-116-6
312E
324B
324D
333D
333C
325D
3258
312E
321D
3218
271D
446495
451411
451411
449315
449315
451411
451411
446495
451411
451411
449316
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3
VT-3
VT-3,VT-4
VT-3
VT-3
VT-3
None
None
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAMASME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)PAGE 8 of 11
COMPONENT OR SYSTEM LINE NO.P 8, IP 104628COORDINATE(S)
SEISMICDWG. NO.
NDE
METH 8 OF SUPPORTS
COMP CLG WTR PP 2 RECIRC
CCW SURGE TK CONN HDR B
CCW SURGE TK CONN HDR A
RCP OIL CLR CCW RTRN HDR
RCP BARRIER CCW RTRN HDR
COMP CLG WTR PP 3 RECIRC
RC PPS BARRIER CCW RET HDR
BA CONC EVAP COND CCW SUP
BA CONC EVAP COND CCW RET
WASTE CONC EVAP COND CCW SUP
WASTE CONC EVAP COND CCW RET
RCP 4 CCW SUP HDR
2K-117-6
2K-121-6
2K-123-6
2K-142-6
2K-143-6
2K-157-6
2K17-1357-6
2K-1759-6
2K-1760-6
2K-1767-6
2K-1768-6
2K-1968-6
252D
257B
256A
291A
293A
254D
293B
301D
301B
305D
305B
292D
449316
445881
445881
445880
445880
449316
446490445880
451411
451411
451411
451441
446495
VT-3
VT-3,VT-4
VT-3,VT-4
VT-3PVT-4
VT-3,VT-4
VT-3
VT-3,VT-4
VT-3
VT-3,VT-4
VT-3
VT-3
VT-3,VT-4
10
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)
PAGE 9 af 11
COMPONENT OR SYSTEM LINE NO.P 81 ID 104528COORDINATE(S)
SEISMICDWG. NO.
NDE
METH 8 OF SUPPORTS
RCP 3 CCW SUP HDR
RCP 1 CCW SUP HDR
RCP 2 CCW SUP HDR
RC PUMPS OIL CLR CCW RET HDR
RCP THERMAL BAR CCW RET HDR
RC PPS OIL CLR CCW RET HDR
RC PPS OIL CLR CCW RET HDR
2K-2211-6
2K-2297-6
2K-2298-6
2K-2311-6
2K17-2340-6
2K-3179-6
2K2-3004-6
2920
294D
291D
292C
292C
292C
292B
446495
446495
446495
446498
446490
445498
445880
VT-3
VT-3
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
VT-3,VT-4
14
19
13
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3
CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)PAGE 10 of 11
COMPONENT OR SYSTEM LINE NO.P 8I ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDE
NETH 8 OF SUPPORTS
MAKEUP WATER SYSTEM-SYS 16
AUX FW PPS CONDENSATE SUCT 2K-380-10 30C, 332C 447118 VT-3 13
DIESEL ENGINE 2-1 JACKET WATER
COOLING SYSTEM
DIESEL ENGINE 2-2 JACKET WATER
COOLING SYSTEM
2*5
2*5
Page 37
Page 37
N/A
N/A
VT-3
VT-3
All
Al 1
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-CLASS 3CODE ITEM D-A, D-B, D-C: PIPING SUPPORTS (ALL TYPES)
PAGE ll of 11
COMPONENT OR SYSTEM LINE NO.P 5 ID 104628COORDINATE(S)
SEISMICDWG. NO.
NDE
! 1ETH ¹ OF SUPPORTS
SALTWATER SYSTEMS - SYS 17
AUX SLTWTR PPS UNITS 1 + 2 X-TIE
COMP CLG HT EXCH 1 OUTLET
COMP CLG HT EXCH 2 OUTLET
AUX SLTWTR PP 1 DISCH
AUX SLTWTR PPS DISCH X-TIE
AUX SLTWTR PP 2 DISCH
MUS DEMIN DRAIN A TO OCEAN
MUS DEMIN DRAIN B TO OCEAN
2G1-933-24
2G1-713-24
2G1-714-24
2G1-687-24
2Gl-676-24
2G1-680-24
2G1-3681-6
2G1-3682-6
374C
377C
377C
374C
374C
375C
378C
377C
577445775057753
500032500034
500032500034
5774457750577535774357745500031500034
577505775357745
5774457750577535774357745500031500034
500031500034
500031500034
VT-3
VT-3
VT-3
VT-3
None
None
None
None
None
None
PGan ~ DIABLO CANYON POWER PLANT-UNIT
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMSPART 4REQUESTS FOR RELIEFPAGE i of 10
REIEUEST ¹
NDE-001
NDE-002
NDE-003
NDE-004a
NDE-004b
NDE-005
NDE-006
NDE-007
NDE-008
NDE-009
NDE-010
.RE-011
NDE-012
REP-001
RE UEST FOR RELIEF INDEX AND DESCRIPTION
Reactor Vessel Shell-To-Bottom Head Weld.
Reactor Vessel Closure Head and Bottom HeadCircumferential and Meridional Welds.
Reactor Vessel Shell-To-Flange and Head-To-Flange Welds.
Reactor Vessel Nozzle-To-Vessel Weldsand Inner Radius Section.
Pressurizer Vessel Nozzle-To-Vessel Welds and InnerRadius Section
ASME Code Class 2 Exemption Criteria (IWC-1220).
Class 2 Pressure Vessel Nozzle and Shell Welds.
Class 2 Vesse1 Insulation Design.
Class I and 2 Pipe Weld Accessability.
Bolt Design For Safety Injection Pumps.
Centrifugal Charging Pump End Plate Weld Schedule.
Scheduling Class 2 Multiple Stream Pipe Welds
Reaenerative Heat Exhcanqer Shell Welds Examination Method
Diesel Engine Block Repair and Replacement
PGandE DIABLO CANYON POWER PLANT-UNIT 2
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS
PART 4RE(UESTS FOR RELIEF NDE-001PAGE 1 of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
REACTOR VESSEL - GIRTH WELD
Item: Circumferential Weld4'10-201 9 Elevation -342.88"
8-A
(B1.10)
Bl.11
CODE RE UIREMENT
Volumetric Examination (by Ultrasonic Shear and Longitudinal Beam) from both directions at right angles towelds where feasible.. Essentially 100K of the weld length is required for examination at or near end ofinspection interval.
BASIS FOR RE UEST
Vessel design of Bottom Head-to-Shell Circumferential weld (10-201) allows only partial examination.Bottom Head Instrumentation Penetrations .and Core Support Lugs (12) all interfere with remote toolaccessability.
ALTERNATE EXAMINATION
Volumetric Examination to extent possible, Visual Examination as required by Code Category B-N-1
(and B-N-3), in addition to Pressure Test as required by Code Category B-P.
SCHEDULED IMPLEMENTATION
Commercial start-up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS
PART 4RE(UESTS FOR RELIEF NDE-002PAGE 2 of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
REACTOR VESSEL - HEAD WELDS
Item: (a) Bottom Head (84-202) Circ'l Welds 5
(b) Closure Head (86-205B) Circ'l Weld
Item: (c) Bottom Head Meridional Welds(81-202A, through 81-202F)
Item: (d) Closure Head Meridional Welds(81-205A, through 81-205F)
B-AB-A
B-A
B-A
(B1.20)
Bl.21B1.21
Bl.22
Bl.22
CODE RE UIREMENTVo umetrlc Examsnation (by Ultrasonic Shear and Longitudinal Beam) from both directions at right angles to the weld
where feasible. Essentially 100K of each weld length is required for welds 6-205B and 1-205A to F during the inter-val; welds 4-202 and 1-202A to F may be deferred to the end of the inspection interval.
BASIS FOR RE UESTesse esign o Bottom Head Weld (4-202) and Meridional Welds (1-202A to F) and Bottom Head Instrumentation
Penetrations constitute Remote Ultrasonic Tool Examination Limitations.Vessel Design of Closure Head Weld (6-205B) and Meridional Welds (1-205A to F) includes encirclement by the CRDM
Penetrations and the Vessel Head Cooling Duct Shroud. These items and the three Top Head Lifting Lugs precludefull volumetric examination.
ALTERNATE EXAMINATIONThe access' engt (38 inches) of each Closure Head Meridional Weld will be ultrasonically examined as scheduled.Bottom Head Welds will be visually examined as required by Category B-N-1 (and B-N-3), all items will be pressuretested as required by Category B-P.
SCHEDULED IMPLEMENTATIONComoercia start to 1.20 months of operation.
0
PGandk DIABLO CANYON POWER PLANT-UNIT 2
EN YEAR EXAMINATION PROGRAMSME SECTION XI SYSTEMS
PART 4REQUESTS FOR RELIEF NDE-003PAGE 3 of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORYCODEITEM
REACTOR VESSEL
Item: Head-To-Flange Weld No. 6-205A B-A B1.30, B1.40
CODE RE UIREMENT
Volumetric Examination (by Ultrasonic Angle and Longitudinal Beam) from both sides at right angles to the weld wherefeasible.
BASIS FOR RE VEST
Flange design prohibits head-to-flange weld examination from the flange side. Additionally 3 Top Head LiftingLugs limit full scan from the head. Alternate examination provides assurance of weld integr ity.ALTERNATE EXAMINATION
The Head-to-Flange Weld will be examined as accessible. Additionally, the welds will be visually examined duringpressure test per Category B-P.
SCHEDULED IMPLEMENTATION
Coamercial start to 120 months of operation.
PGandE DIABLO CANYON POMER PLANT-UNIT
EN YEAR EXAHINATION PROGRAH
SHE SECTION XI SYSTEHSPART 4REQUESTS FOR RELIEF NDE-004PAGE 4a of 10
COHPONENT OR ITEH ASHE XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEH
REACTOR VESSEL - NOZZLE MELDS
Item: Primary Nozzle tn Vessel Melds
(a) 29 Inch Outlet Nozzles (Total 4)(Pipe Nominal Diameter)
(b) 27.5 Inch Inlet Nozzles (Total 4)(Pipe Nominal Diameter)
CODE RE UIREHENT
B-D B3.90B3.100
Volumetric Examination by Ultrasonic Shear and Longitudinal Beam) at right angles to the weld from the vessel shill.Volumetric Examination (by Ultrasonic Longitudinal Beam) from inside the vessel nozzle. Melds will be examined frominside the nozzle as scheduled, and from the shell at the end of the inspection interval per Code Case 1647 (N-73).
BASIS FOR RE UEST
Nozzle Reinforcement precludes part of the examination for all outlet nozzles as it prevents the transducers frommoving completely across the weld.: It prevents full scan from the near side of adjacent nozzles by obstructingfull transducer movement back from the nozzle. Inlet nozzle openings similarly obstruct full coverage at thenear side of all adjacent nozzles.
ALTERNATE EXAHINATION
Volumetric examination of all nozzles as accessible. Visual examination per category B-N-1 and pressure test percategory B-P.
SCHEDULED IHPLEHENTATION
Commercial start up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT
EN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMSPART 4RE(UESTS FOR RELIEF NDE-004PAGE 4b of 1Q
COMPONENT OR ITEN ASHE XICODE CLASS
PROGRAM
TABLECODE
CATEGORYCODE
ITEM
PRESSURIZER VESSEL - NOZZLE WELDS & INNERRADIUS
Item: Safety Nozzle, Spray N'ozzie, ReliefNozzles (3), Surge Nozzle. Nozzleto vessel welds. Inner Radius Area.
1.2 B-D B3,11083.120
CODE RE UIREHENT
Volumetric Examination (by Ultrasonic Shear and Longitudinal Beam) at .right angles to the weld from the vessel shell.Volumetric Examination to include nozzle inner radius area.
BASIS FOR RE UEST
Vesssel welds are accessible from vessel shell side only (not accessible from nozzle side due to configuration) surgenozzle is further limited by heater penetrations. Compound curvature of vessel shell combined with short radii ofnozzles and surface geometry makes meaningful inner radius examination impossible.
ALTERNATE EXAMINATION
Volumetric examination of all nozzle welds as accessible. Pressure test per category B-P
SCHEDULED IHPLEMENTATION
Commercial start up to 120 months nf operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS-
PART 4REQUESTS FOR RELIEF NDE-005PAGE 5 of 10
COMPONENT OR ITEM ASME XI-CODE CLASS
. PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
PIPING WELDS
Item: Class 2 Piping Systems .
CODE RE UIREMENT
2 2.2 C-F
(C5.10)C5.11, C5.12
'(C5.20)C5.21, C5.22
'(C5.30)C5.31, C5.32
The NDE Exemption Criteria established by IWC-1220 1974 Edition, Summer 75 Addenda is to be utilized to develop theDCPP Unit 1 Code Class 2 pipe weld ISI Program as indicated by 10CFR50.55a(b)(2)(iv)(B).
BASIS FOR RE VEST
PGandE does not concur with the basis for many of the Summer 75 Exemption Criteria. IWC-1220(a) utilizes designparameters while neglecting the possibility of using conservative design specifications and does not take theactual operating conditions of systems into account. It also fails to recognize the safety significance of some
systems over others. IWC-1220(c) uses system chemistry control to allow exempting components from inspections.Chemistry control, however, eliminates only one possible failure mode and should not be the sole justificationfor eliminating inspections. The requirements of IWC-1220 in the 1977 Edition, Summer 1978 Addenda are more realisticthan those of the 1975'dition, and are in keeping with the philosophy of PGandE and ASME.
ALTERNATE CRITERIA1
The class 2 NDE Exemption Criteria established by IWC-1220 1977 Edition, Suraner 78 Addenda will be utilized todevelop the DCPP Unit 2 Code Class 2 pipe weld ISI Program.
SCHEDULED IMPLEMENTATION
Commercial start-up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMSPART 4REQUESTS FOR RELIEF NDE-006PAGE 6a of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
Seal Inj. Filter 2-1Girth Welds Item 1, 2
Excess Letdown Ht. Exr.Girth Welds Item 13, 14
Regenerative Ht. Exr.Girth Welds 9,10,11,12
RHR Ht. Exchr. 2-1Girth Welds Item 21, 22
RHR Ht. Exchr. 2-1Nozzle Welds Item 23, 24
Stabilizer SeparatorGirths Welds A,B
CODE RE UIREMENTS
2.1
2.1
2.1
2.1
2.1
2.1
C-A
C-A
C-A
C-A
C-B
Cl.10, Cl.20
C1.10, C1.20
C1.20, C1.30
C1.10, C1.20
C2.20
C1.20
Volumetric examination (by Ultrasonic Angle and Longitudinal Beam) from both sides of the weld where possible.
BASIS FOR RE VEST
Seal Injection Filter- The Seal Injection Filters are located in a vault that prohibits access for examination dueto the proximity of the vault walls, piping and filter supports. Additionally, the vaultswill be high radiation areas and the extremely limited access does not justify the personnelexposure involved.
Heat Exchangers and - Shell configuration limits access on all vessels from the head or flange side. Additionally,Stabilizer Separator welds on the heat exchangers are blocked by support member attachments. RHR Heat Exchanger
Nozzle-to-Shell welds are limited by the vessel head, flange, and supports.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMSPART 4RE(UESTS FOR RELIEF NDE-006PAGE 6b of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
ALTERNATE EXAMINATION
All Vessels
All Other HeatExchangers andStabilizerSeparator
SCHEDULED IMPLEMENTATION
Pressure test per Category C-H. RHR Heat Exchanger Shell and Nozzle welds - Surfaceexamination (IWC-2500-1).
Full Code volumetric examination as accessible. Surface examination of accessible areas ofwelds not accessible for volumetric examination.
All areas examined and all examination limitations will be documented at the time ofexamination.
Coranercial start-up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
SME SECTION XI SYSTEMS
PART 4REQUESTS FOR RELIEF NDE-007—PAGE 7a of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
BORON INJECTION TANK
Circumferential Welds
CODE RE UIREMENT
2.1 C-A C1.20
Volumetric Examination of Circumferential Welds (by Ultrasonic Shear and Longitudinal Beam) from both directions atright angles to welds where feasible. The Volumetric Examination is performed at structural discontinuities (asdefined by NB-3213.2 and Table IWC-2500-1 Footnote 2) so that the examinations total 100K of one vessel. Examinationtechniques are required to be performed in accordance with ASME Code Section V, Article 4 and divided in accordancewith Code Section XI Table IWC-2412-1 over the inspection interval.
BASIS FOR RE UEST, S
Vessel insulation removable panels and vessel accessibility provisions were designed and constructed to conform tothe Sunmer 1975 Code Addenda. With the acceptance of Suraner 1978 Addenda, the existing provisions for removalof insulation (20K) became inadequate to comply with new code requirements. The present design consists of removableinsulation panels approximately 120'part for each circumferential weld. The panels expose a minimum of 20K of each
weld for examination when scheduled. The proposed examination schedule outlined in Tab Section 2. 1 in addition to thespecified alternate examinations show that no design changes are justified to fulfill the latest approved Code SectionXI and Addenda. To impose a design change for insulation panelling and accessibility would create a significant burdenon plant and personnel with no significant gain in plant or public safety.
PGandk
N R
ASME SECTION XI SYSTEMS
DIABLO CANYON POMER PLANT-UNIT 2
PART 4REQUESTS FOR RELIEF NDE-007PAGE 7b of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
ALTERNATE EXAMINATION
Full Volumetric Examination of the accessible areas to total 100K over the inspection interval as outlined above
and Pressure Test as required by Code Category C-H.
SCHEDULED IMPLEMENTATION
Commercial start-up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS
PART 4REQUESTS FOR RELIEF NDE-008PAGE 8 of 10
COMPONENT OR ITEM. ASHE XICODE CLASS—
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
PIPE WELDS
CODE RE UIREHENTS
152 ~ 1.4, 2.2 B-J, C-F B9.X0 C5.X
Volumetric examination per Appendix III for applicable Class 1 pipe welds 4 inch and greater nominal diameter and
for applicable Class 2 pipe welds over 1/2 inch nominal wall thickness. Surface examination for all applicablepipe welds.
BASIS FOR RE UEST
Surface configuration of pipe-to-component and in some cases pipe-to-fitting welds prohibits ultrasonic examinationfrom the component or fitting side of the weld. In some- cases, wall or floor penetrations or non-removable supportmembers limit access from one side (or both sides) of the weld.
ALTERNATE EXAMINATION
Full Code examination of all welds and portions of welds as accessible. Pressure test as required by Category B-P
or C-H.
SCHEDULE IMPLEMENTATION
Coamercial start-up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS
PART 4REQUESTS FOR RELIEF NDE-009PAGE 9 of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
SAFETY INJECTION PUMPS
Item: Pump Casing Bolts(Exceeding 2 inch diameter)
CODE RE UIREHENT
2.3 C-D C4.30
Volumetric Examination (when in place) by Ultrasonic Longitudinal Beam to comply with Section XI, Code FigureIWC-2520-6. The bolt examinations are distributed over the inspection interval to comply with IWC-2412-1.
BASIS FOR RE UEST
Bolting Ultrasonic Examination is restricted by the design utilizing outside "acorn nuts" which preclude anyultrasonic transmission through the bolts while the pump is assembled. Because of the pump design and
availability, no specific inspection period is specified. Instead, the examinations will be scheduled inaccordance with the plant maintenance schedule, and will be done once during the inspection interval.
ALTERNATE SCHEDULE
Volumetric Examination of all bolts (as required by Table IWC-2500-1) on one pump selected for maintenance and
pressure test as required by Code Category C-H.
SCHEDULED IHPLEMENTATION
Comoercial start-up to 120 months of operation.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS
PART 4RE(UESTS FOR RELIEF NDE-010PAGE 10 of 10
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
CENTRIFUGAL CHARGING PUMP
Item: Suction End Plate Weld
CODE RE UIREMENT
2.3 C-G C6.10
Surface Examination from inside or outside of pump casing. The Surface Examination may be performed on one pump.
The examination is required (when practical) to be distributed over the inspection interval to comply withTable IWC-2412-1.
BASIS FOR RELIEF
The Suction End Plate Weld, is a machined weld. that is essentially inaccessible (by design of the pump) for an
examination according to a specific inspection period schedule. Because of the pump design, no specific inspectionperiod schedule is appropriate. Instead, examination will be scheduled in accordance with the plant maintenanceschedule, and will be done once during the inspection interval.
ALTERNATE SCHEDULE
Surface Examination of all machined weld areas on the Suction End Plate as required on one pump selected formaintenance as schedule allows, and Pressure Test as required by Code Category C-H.
SCHEDULED IMPLEMENTATION
Commercial start-up to 120 months of operation.
r r~
r f ~ ) ~ r
I r r f ~ ~ ) I ~ r ~
r ~
~ ~$
~ ~ ~ ra 1I
I r
I
~ ~
)1«
~ I ~ ~
I I ~ ~ I
I '« ~ f «
~ I
e ~ « ~
~ ~
~ I ~ r«o I
'~
-~
I I ~ ~ I I
« I~ I '
~
I I I ~ ~ ~ I
~ « I ~ ~ ~ ~ ~
~ ~
~ ~~ I
f ~
~ ~ ~ I I
I ~ '« ~ ~ .
~ ~ ~ I I
~ ~ ~ ~ I
I ~
~ I
I ~ I I~ I
~ ~
I ~ ~ ~ I ~ ~ I ~ ~ ~ I ~ ~
~ ~
I ~
r I ~
~ f ' ~ I,~ I
~ I I
I ~
~~
I
~ I I ~ ~
~ I ~
~ ~ ~'
~ ~ I I I ~ I
~ I
I I
I ~
'« ~ ~ .
~ ~ ~ I
~ ~ ~
I I I ~ ~ I I
I I I
~ ~ ~ ~ I
~ ~
~ ~ I
r ~ I
~ I
I ~
I « ~ ~ I
~ I
~ I
~ ~
~ ~
I I ~
I«I
~ / ~ ~ I
~ ~$
I ~ ~ ~ ~ ~
~ ~ ) I
I 'I I I$
I ~ ~ ~
I I I ~ ~ ~
I I I~ ~
I ~ I I
~ ~ I I
~ I~ ~
~ ~ I ~
I ~
I ~ ~ ~ I~ I I I ~ I
~ I ~ I ~ I
I ~ I ~ I I
I I I~ I
~ ~
~ I I ~ o I I ~ I ~ I ~ I
I I ~ ~ ~
~ ~ ~
I
I ~
I ~ I ~
I
~ I
II ~
I ~
I I e
~ I
~ I I ~
~ ~ I
~ ~
~ ~ I ~ ~
I
I I ' I
~ I ~
~ ~
I ~ ~
I I I ~
I ~
~ I
~ ~
~ ~
~ ~ ~
PGandE DIABLO CANYON POWER'L'ANT-UNIT 2
TEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS
PART 4REQUESTS FOR RELIEF NDE-012PAGE 1 of 1
COMPONENT OR ITEM ASME XICODE CLASS
PROGRAM
TABLECODE
CATEGORY
CODE
ITEM
REGENERATIVE HEAT EXCH'R
SHELL WELDS
CODE REQUIREMENT
2.2 C1.20/C1.30
Volumetric Examination of Head Circumferential Welds and Tubesheet to Shell Welds.
BASIS FOR REQUEST
Volumetric Examination by Radiography is not practicable.due to; 1. High background radiation levels; 2. Complexgeometry of the tubesheet to shell weld including the tubes themselves; 3. The vessel is filled with water.
Volumetric Examination by Ultrasonics is not practicable because of the shell material, ASTM A351 Gr. CF and productform, centrifugally cast stainless steel. The inability of ultrasonic techniques to provide meaningful data iswell documented.
ALTERNATE EXAMINATION
Liquid Penetrant examination of all applicable welds to the fullest extent practicable. Visual examination duringscheduled pressured test and visual examination as scheduled for vessel supports.
SCHEDULED IMPLEMENTATION
Commercial start-up to 120 months of operation.
APPENDIX A
DIABLO CANYON CALIBRATION STANDARDS
Page 1 of 27/28/81
ULTRASONIC STANDARDS
NO.
1
2
3
5
6
7
8
9
10
ll12
13
14
15
16
17
18
19
20
21
22 A
22 B
23
24
25
26
27
MAT'L
=- SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
CS''
CS .
=- CS
SS
SS
SS
SS
SS
CS
SS
SS
SS
SS
SS
SS
SS
DIA.
1 1/2" pipe2 pipe3" pipe4" pipe6" pipe6" pipe8" pipe8" pipe
10" pipe12" pipe14" pipe14" pipe16" pipe24" pipe28" pipe12" pipe6" X 8 1/2" plate8 1/2" X 8 3/4" p1ate12" X 13" pipe12" X 12" pipe12" X 12" pipe31" pipe31" pipe1 ft. pipe6" pipe8" pipe2" X 1.20"X300"
WALL THICKNESS
0.281" T
0.343" T
0.438" T
0.438" T
0.280" T
0.718" T
0.322" T
0.812" T.
1.000" T
0.406" T
0.438" T
1.406" T
0.843" T
0.968" T
1.002" T
1.312" T
1/2" T
1II
0.900" T
1.250" T
0.688" T
2 II
2ll
5/8-" T
0.134" T
0.148" T
3" T
APPENDIX A(Cont'd)
DIABLO CANYON CALIBRATION STANDARDS
Page 2 of 27/28/81
ULTRASONIC STANDARDS(Cont ')'O.
W - RC PipeW'001W ¹003
W ¹004
W ¹011
W CROM
W ¹015
W ¹016
MAT'L
SS
SS
SS
CS
SS
SS
CS
CS
DIA.-4" WX9" L
10n
4" pipe3" X '3" X 10 3/8"
plate
WALL THICKNESS
2 3/8"
1 1/2"
] II
.531"
3 II
EDDY CURRENT STANDARDS
¹ 11
¹ 2784
¹ 31
¹ 2-909
¹ 2-910
Inconel'nconel
600
Inconel. 600
Inconel 600
Inconel 600
7/8"7/8 I I
7/8"7/8"7/8"
0.05".049"
0.05"
049'049"
Line Size ~Sec.
CLASS 1 LINES,
Std.
S 1978 ASME XI
Nominal MaterialWall
Thickness
56781
23
910111216
1091665253254255256
2575**2576**
235236237238727728729730
3844**3845**3846**3847**
131415
4081
313131312929292927.527.527.527.514141410101010
88666666'6-6666
44
S6S6S6S6S6S6S6S6S6S6S6S6 ~
S6S6S6S6S6S6S6S6S6S6S6S6
22 A, B
22 A, B
22 A, B
22 A, B
22 A, 822 A, B
22 A, B
22 A, B
22 A, B
22 A, B
22 A, B
22 A, B121212
999.988666'666666666444
,4
2.52.52.5,2.52.52.52.52.52.52.52.52.5
Sch 160Sch 160Sch 160Sch 140Sch 140Sch 140Sch 140Sch 140Sch 140Sch 160
. Sch 160Sch 160.Sch 160Sch 160Sch 160Sch 160Sch 160Sch 160Sch 160Sch 160Sch 160Sch 120Sch 120Sch 120Sch 120
SS
. SSSSSSSSSSSSSSSSSSSSSSSS
Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316
, Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316Tp 316
2.52.52.52.52.52.52.52.52.52.52.52.51.4061.4061.4061.0001.0001.0001.000
.812
.812
.719
.719
.719
.719
.719
.719
.719
.719
.719
.719
.719
.719
.438
.438
.438
.438
All other 3" or less 0, All Sch. Tp; 304, PT
**Portions of these lines are Class 2. See Isometric Drawing.
NOTE 1: Class 1 lines smaller than 4" diameter are no long subject toultrasonic test requirement (Asme XI S 1978), For these lines"PT" (Penetrant test) will be indicated, followed by the ultra-sonic calibration standard number in parentheses (for referenceonly).
'CLASS 2 LINES, S 1978 ASME XI
Line Size ~Sec. SM. NominalWall
Material Thickness
225226227228
10651066
544555556557110ill512513927
3551120223985112113118119279280508509734735
1456166116631669197119841986198719882212245825759™2576**
4243
1454;1973198219832032
2828282824241616161614141414'4141212128888888888.88888888888886666666
K15K15
K15'15
K15K15K16K16K16K16SlSlSlSlSlSlS6SlSl
., SlSlSlSlSlSlS6S6S2SlS2SlSlSlSlS2S2S2S2SISlS6S6S2S2S6S7S2S2S6
PTPT'T
PTPTPTPTPT
10)10)7)
7)
7)
88
PTPT (7)PTPT
(
PT
7)7)
7)
PTPTPTPT 7)
88
PTPT .
66
PTPT
6
15151515141413131313
PT 11
PT 11PT (11)PT 11PT 11- 16 -*
1.002 Min.1.002 Min.1.002 Min.1.002 Min.Sch 60Sch 60Sch 80Sch 80Sch 80Sch 80Sch 40Sch 40Sch 40Sch 40Sch 40Sch 40Sch 160Sch 40S*Sch 40S*Sct 40SSch 40SSch 40SSch 40SSch 40SSch 40SSch 140Sch 140Sch lOSSch 40SSch 10SSch 40SSch 40SSch 40SSch 40SSch 10SSch 10SSch 10SSch 10SSch 40SSch 40SSch 140Sch 140Sch 10SSch 10SSch 160Sch 160Sch 10SSch 10SSch 160
SA 516/70SA 516/70SA 516/70SA 516/70A 106/BA 106/BA 106/BA 106/BA 106/BA 106/B
304304
Tp 304Tp 304
304304
Tp 316304
Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 316Tp 316Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp 304Tp. 316Tp 316Tp 304Tp 304Tp 316Tp 316Tp 304Tp 304Tp 316
1.0021.0021.0021.002
.969
.969
.844
.844
.844
.844
.438
.438
.438
.438
.438
.4381.312
.375
.375
.322
.322
.322
.322
.322
.322'812
.812
.148
.322
.148
.322
.322
.322
.322
.148
.148
.148
.148
.322
.322
.812
.812
.134
.134
.719
.719
.134
.134
.719
Min.Min.Min.Min.
Line Size ~Sec. Std. NominalMall
Materi al Thickness
3844**3845*+3846*43847**4296
S6S6S6S6S2S2
6666PTPT
Sch 160Sch 160Sch 160Sch 160Sch 10SSch 10S
Tp 316Tp 316Tp 316Tp 316Tp 304Tp 304
.719
.719
.719
.719
.134
.134
*12" Sch 40S is standard wall, *.375"T. NOT same as 12" Sch 40
**Portions of these lines are Class 1. See isometric drawing.
NOTE I: CuSS 2 LINES LESS THAN 5P'ALL THICKNESS ARE NO LONGER SUBJECTTO ULTRASONIC TEST REQUIREMENT (ASK XI S 1978). FOR THESE
LINES'PT"
(PENETRANT TEST) WILL BE INDICATED> FOLLOWED BY THE ULTRA-SONIC CALIBRATION STANDARD NUMBER IN PARENTHESES (FOR REFERENCEONLY).
PGandE
DIABL N N WR LN -UITTEN YEAR EXAMINATION PROGRAM
ASME SECTION XI SYSTEMS
DIABLO CANYON POWER PLANT-UNIT 2
SYSTEM PRESSURE
TEST SUMMARY
FOOTNOTES:
(1) IDENTIFIES THE DRAWING SHEET NUMBER Of THE ASME CODE CLASSIFICATION DRAWINGS, PGandEDRAWING 104628.
(2) IDENTIFIES THE APPLICABLE ASME B&PV CODE SECTION XI PRESSURE TEST REQUIREMENT AS
ESTABLISHED BY THE 1977 EDITION - SUMMER 1978 ADDENDA.
(3) INS/FUNCT IS THE TEST PRESSURE DEVELOPED UNDER THE OPERATING CONDITIONS ASSOCIATEDWITH NORMAL SYSTEM OPERATION OR A SYSTEM/COMPONENT FUNCTIONAL TEST.
(4) -I IS ONE TEST PER EACH INSPECTION INTERVAL 10 YR)P IS ONE TEST PER EACH INSPECTION PERIOD 3, 7, 10 YRS)R IS ONE TEST PER EACH REFUELING OUTAGE FOR COMPONENTS OPENED AND RECLOSED SINCE
THE LAST TEST)
(5)P0 IS THE NOMINAL SYSTEMOPERATING PRESSURE ~
PSV IS THE SAFETY OR RELIEF VALVE SETTING PRESSURE.
PG IS THE DESIGN PRESSURE OF VAPOR OR GAS SPACE ABOVE LIQUID LEVEL FOR WHICH OVER
PRESSURE PROTECTION IS PROVIDED BY RELIEF VALVES.
NOTE 1: PIPING PRESSURIZED DURING NORMAL REACTOR OPERATION AND DOES NOT REQUIRETEST PER IWC-5221. NORMAL REACTOR OPERATION INCLUDES SYSTEMS IN OPERATIONDURING STARTUP, OPERATION, COOLDOWN AND SHUTDOWN CONDITIONS.
PGandE
L 0TEN YEAR EXAMINATION SUNNRYASHE SECTION XI SYSTEMS - CLASS I
DIABLO CANYON POWER PLANT-UNIT 2
S E R
TEST SUNMARYPAGE 1 OF 2
C HPON N R PIN SYS ENDESCRIPTION
SH
No. (1)R 0 IR D
RE(UIRENENT(2 TESI PRESS FREq(4)REbNRKS
1. REACTOR COOLANT PUMPS2-10 2-2) 2-30 2-4
2. STEAN GENERATORS 2-1,2-2, 2-3, 2-4 (TUBE SIDE)
5,6,8
IMB-5221IMB-5222
IWB-5221IWB-5222
22352459
22352459
PO= 2235 psig for Class 1 Piping
3. REACTOR VESSEL, PRIMARYCOOLANT LOOPS AND CONNECTED
PIPING
4. PRESSURIZER 2-1
8.9
10
5. PRESSURIZER RELIEF/SPRAY
HOT 8I COLD LEG RTDS
10
7. REACTOR COOLANT PUMP SEAL. MATER INJECTION/BYPASS
LETDOWN AND EXCESSLETDOWN LINES
CHARGING AND AUXILIARYSPRAY
0. SIS ACCUN DISCH AND TESTLINES
12
12,13,8
'l48, 10
17, 8
1. RHR INJECTION TO COLD LEGS 17, 8
IMB-5221IWB-5222
IWB-5221IMB-5222
IWB-5221IWB-5222
IWB-5221IWB-5222
IWB-5221IMB-5222
IWB-5221IWB-5222
IWB-5221IWB-5222
IWB-5221IWB-5222
IWB-b222IMB-5222
22352459
22352459
22352459
22352459.
22352459
22352459
22352459
22352459
22352459
R'I Includes Category B-E, CRD 8instrumentation partialpenetration welds
Includes Category B-E, heaterpartial penetration welds
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION SUMMARY
ASHE SECTION XI SYSTEMS - CLASS I
DESCRIPTION RE(UIREHENT(2) TEST PRESS FREg(4)
S H PR SSUR
TEST SUMMARY
PAGE 2 OF 2
REMARKS
12. BORON INJECTION INSIDECONTAINMENT
13. SAFETY INJECTION INSIDECONTAINMENT
14. RHR HOT LEG SUCTION ANDDISCH
8,18
17,19
8,20,19
IWB-5221IWB-5222-
IWB-5221IWB-5222
IWB-5221IWB-5222
22352459
2235
2459'235
2459
R
R-I
PGandE
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
S STEM PRESSURETEST SUOSRYPAGE 1 OF 9
COMPONENT OR PIPING SYSTEMDESCRIPTION
SHEETN0.(1)
CODE REQUIREDREQUIREMENT(2) TEST PRESS
(PSIG) - (3)
TESTFREQ(4)
REMARKS
1. FEEDWATER SUPPLY LEADS
2. AUXILIARY FEEDWATER SUPPLY
3. STEAM GENERATORS 2-3 & 2-4SECONDARY SIDES
3,5,6
IWC-5222 (a)
IWC-5222 'a)1331
1331
IWC-5222 (a) 1331 PSV 1065» NOTE 1
PSV 1065, NOTE 1
PSV 1 65'OT
4. MAINSTEAH LEADS 3 & 4 AND
5. HAINSTEAM LEADS 1 & 2
6. STEAM GENERATORS 2-2 & 2-1SECONDARY SIDES
7. AUXILIARY FEED PUMP 2-1TURBINE STEAM LEAD
8. STEAM GENERATOR BLOWDOWN
9. LOOP 1 8 4 HOT LEG SAMPLELINES 2S-1675-3/8 &
2S6-1676-3/8
5,6
5,6,7
8,22
IWC-5222,(a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a) .
1331
1331
1331
1331
1331
2459
PSV 1065'OTE 1
PSV 1065'OTE 1
PSV 10 5'OTE 1
PSV— 1065, NOTE 1
PSV— 1065; NOTE 1
NO SAFETY VALVE IN SYSTEM-TESTED WITH CLASS 1; NOTE 1
PGandE
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
P SSUR
TEST SUMMARY
PAGE 2 OF 9
DESCRIPTION No.(l) RE(UIREMENT(2) TEST PRESS
(PSIG) (3)FREq(4)
REMARKS
10.
12.
13.
14.
15.
16.
PRESSURIZER SAMPLE LINES2S-1673-3/8 8I 2S-1674-3/8
EXCESS LETDOWN HEATEXCHANGER 2-1 TUBE SIDEAND INLET/OUTLET PIPING
REACTOR COOLANT PUMPS
SEAL WATER OUTLET/EXCESSLETDOWN H-X OUTLET (SPECS2 PIPING PORTION)
REACTOR COOLANT PUMPS HIPRESSURE SEAL-WATEROUTLET PIPING (SPEC 26)TO VALVE 2-8142
RCP SEAL WATER INLETPIPING
RCP SEAL WATER INLETUNISOLABLE FROM CLASS 1
(2-8393 TO 2-8372)
REGENERATIVE HEAT EXCHANGER2-1 SHELL SIDE AND LETDOWN
PIPING TO 2-8153
10,22
12
12
12
12,14
12
13
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
2459
2459
188
2459
3419
2459
750
NO SAFETY VALVE IN SYSTEM - TESTEDWITH CLASS 1; NOTE 1
NO SAFETY VALVE IN SYSTEM - TESTEDWITH CLASS 1; NOTE 1
PSV= 150; NOTE 1; REQUEST FOR
RELIEF 86
NO SAFETY VALVE IN SYSTEM - TESTEDWITH CLASS 1; NOTE 1
PSV 2735~ NOTE 1
RE(}UEST FOR RELIEF f5; NOTE 1
PSV— 600, NOTE 1
PGandE
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
E PR SSU
TEST SUMMARY
PAGE 3 OF 9
N P
DESCRIPTION RE(UIREMENT(2) TEST PRESS FRY(4)(PSIG) (3)
REMARKS
17.
18.
19.
20.
BORIC ACID PUMPS DISCHARGE
HEADER, BA BLENDER INLET,RECIRC TO BIT TO 2-8911
RECIP CHARGING PUMP 5DISCHARGE PIPING
14
CENTRIFUGAL CHARGING PUMPS 14,18AND SUCTION PIPING
CHARGING PUMP DISCHARGE,SEAL WTR INJ FILTER,REGEN H-X PIPING
IWC-5222 (a)
.IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
275
3419
275
3419
SVO; NOTE 1
PSV 2735; NOTE 1
PSV- 220, RE(UEST FOR RELIEF ¹1
NOTE 1
PSV 2735~ NOTE 1
21.
22.
23.
24.
SEAL WATER INJECTIONFILTERS
CHARGING LINE TO COLD LEGS
8 PRESSURIZER UPSTREAM OF
AUX SPRAY VALVES 2-8147,2-8146,2-8145, 2-8148, 2-8482
CHARGING LINE PORTIONSUNISOLABLE FROM CLASS 1
BORIC ACID TANKS TO PUMP
DISCH ISO VALVES
14
14
15
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (b)
3419
3419
2459
TANK FILLED I
PSV 73 ' T 1
SV2735; NOTE 1
RE(UEST FOR RELIEF ¹5; NOTE 1
RE(UEST FOR RELIEF ¹1; NOTE 1
PGandE
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2
P SURS S
TEST SUMMARY
PAGE 4 OF 9
DIABLO CANYON POWER PLANT-UNIT 2
MP N N R P NG S
DESCRIPTIONSH E
No. (1)CD RQURREQUIREMENT(2) TEST PRESS
(PSIG) (3)
S
FREQ(4)REMARKS
25.
26. ACCUMULATOR INJECTIONLOOPS 1 THRU 4, TEST LFILL PIPING UP TO VALVES2-8877A, B, C 5 D
17
BORIC ACID TRANSFER PUMPS, 15,18DISCH AND RECIRC PIPING
IWC-5222 (a)
IWC-5222 (a)
275
2459
PSV 220 NOTE 1
REQUEST FOR RELIEF II5; NOTE 1
27. ACCUMULATOR TEST 8 FILLPIPING
28. SAFETY INJECTION
29. ACCUMULATOR SAMPLE LINES—
FROM VALVES 2-9367A-D TO
2-9352A-D
30., BORON INJ CHECK VALVESLINE 2S6-4348-3/4 5 SISPUMP DISCH TEST LINE2S6-2570-3/4
17,19,18
17
17,22
17,1819
IWC-5222 (a)
IWC-5221
IWC.-5222 (a)
'WC-5222(a)
IWC-5222 (a)
IWC-5221
2459
2235
875
875
2188
INS/FUNCT
NO SAFETY VALVE IN SYSTEM - TESTED
WITH CLASS 1
TESTED WITH CLASS 1
PSV= 7009 NOTE 1
PSV— 700, NOTE 1
PSV- 1750
31. BORIC ACID RECIRC DWNSTRM
2-8911 TO AND FROM BIT18 IWC-5222 (a) 3419 PSV
= 2735; NOTE 1
PGandE
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2:
DIABLO CANYON POWER PLANT-UNIT 2
SYS EM PR SSUR
TEST SUMMARY
PAGf 5 of 9
MPNN R PN S
DESCRIPTION
SH
No.(1)0 RQ RD S
REQUIREMENT(2) TEST PRESS FREQ(4)(PSIG) (3)
REMARKS
32.
33.
34.
CHG TO BIT AND BITBYPASS
BORON .INJECTION TANK,INLET AND OUTLET PIPING
BORON INJ TO COLD LEGS
(2-8801A,B TO 2-8820)
14,18
18
18
IWC-5222 (a)-
IWC-5222 (a)
IWC-5222 (a)IWC-5221
3419
3419
24592235
SV5' E
PSV 2735 ~ NOTE 1
REQUEST FOR RELIEF 05TESTED TO CLASS 1 PRESSURE
35. REFUELING WATER STORAGE
TANK AND SUPPLY TO FIRSTISO VLVS
18,1923
IWC-.5222 (b) TANK FILLED I NOTE 1
36.
37.
38.
39.
RWST SUPPLY TO CHG PUMP
PUMPS (2-8805 TO 2-8924)
RWST SUPPLY TO CHG PUMP
SUCT (2-8924 TO CHG PUMP)
SAFETY INJECTION PUMP
DISCHARGE/HOT LEG
INJECTION PIPING INSIDECONT. ISO VALVES (2-8802A,B)
RHR COLD LEG INJ PIPINGFROM 2-8809A,B TO CLASS 1
18
14,18
19
19
IWC-5222 (a)IWC-5221
IWC-5222 (a)IWC-5221
IWC-5222 (a).
IWC-5221
IWC-5222 (a)
275INS/FUNCT
275INS/FUNCT
2459
2235
2459
PSV— 220
PSV— 220
NO SAFETY VALVE IN SYSTEM-TESTED WITH CLASS 1;REQUEST FOR RELIEF III5
TESTED WITH CLASS 1
REQUEST FOR RELIEF 85;NOTE 1
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2
P N N
DESCRIPTIONS
No.(1)R
REQUIREMENT(2) TEST PRESS
(PSIG) (3)FREQ(4)
TEST SUMMARY
PAGE 6 of 9
REMARKS
40,
41.
42.
43.
44
'5.
46.I
47.
RHR COLD LEG INJ PIPINGUPSTRM 2-8809A,B
CONTAINMENT RECIRC SUMP
OUTLET LINES 2*-2749 52-2750-14
CONT RECIRC SUMP OUTLETLINES DOWNSTREAM OF
VALVES 2-8982A,B
RHR SUCTION PIPING FROM
RWST 2-8981
RHR SUCTION PIPING FROM
RWST TO 2-8981
RHR DISCH PIPING, SUPPLYTO SIS PUMP SUCTION
SAFETY INJECTION PUMPS
SUCTION, DISCH, AND TESTLINE TO RWST
SIS PP RWST SUCTION
19,22
19
19,20
19
19,20
18,19
19
IWC-5222 (a)
IWC-5222 (c)
IWC-5221
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5221
IWC-5222 (A)
. 750
563
563
275
750
275
INS/FUNCT
275
PSV— 600; NOTE 1
REQUEST FOR RELIEF 87
REQUEST FOR RELIEF 07
PSV 450~ NOTE 1
PSV"-450; NOTE 1
PSV= 220; NOTE 1
SV'N
P = 220; SEE REQUEST FOR
RELIEF Pl
PSV 220~ NOTE 1
PGandE
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
S M PR SSUR
TEST SUMMARY
PAGE 7 of 9
MP N
DESCRIPTION No.(l) REQUIREMENT(2) TEST PRESS FREQ(4)(PSIG) (3)
REMARKS
48.
49.
50.
51.
52.
53.
54.
S IS PP DISCHARGE PIPINGTO 2-8802A,B, 2-8835
SI COLD LEG INJDOWNSTREAM OF 2-8835
RHR HOT LEG INJ TESTLINES TO 2-8884A-D, 2-8825,2-8885A,B, 2-8824, 2-8823
RHR HOT LEG 1 5 2INJECTION PIPING TO2-8703 PLUS BYPASS LINE(2-8726A,B)
RHR HOT LEG 1 8 2DOWNSTRM 2-8703 TO 2-8740A,B
RHR PUMPS 8 SUCTIONPIPING
RHR PUMP DISCHARGE PIPINGAND COLD LEG INJ PIPING
19
19
19
20
20
20
18,2019,23
. IWC-5222 (a)-
IWC-5221
IWC-5222 (a)
IWC-5221
IWC-5222 (a)
IWC-5221
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (a)
2188
INS/FUNCT P
2459
2235
2459
2235
750
2459
563
750
PSV— 1750
REQUEST FOR RELIEF P5; NO SAFETY
VALVE IN SYSTEM - TESTED WITH CLASS
1TESTED WITH CLASS 1
REQUEST FOR RELIEF 85; NO SAFETY
VALVE IN SYSTEM - TESTED WITH CLASS
lTESTED WITH CLASS 1
PSV— 600, NOTE 1
REQUEST FOR RELIEF 85; NOTE 1
PSV— 450; NOTE 1, REQUEST FOR
RELIEF 81
PSV— 600, NOTE 1
PGandf
TEN YEAR EXAMINATION SUMMARY'ASME SECTION Xl SYSTEMS - CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
P S
TEST SUMMARY
PAGE 8 of 9
P N N N
DESCRI PTION No.(1) REQUIREMENT(2)R D
TEST PRESS
(PSIG) (3)FREQ(O)
REMARKS
55. RHR PUMP SEAL PIPING
56. RHR SAMPLE LINES
57'. CONTAINMENT SPRAY RINGSUPPLY PIPING, SPEC S3
58. CONT. SPRAY PUMP DISCHARGEPIPING
59. RWST SUPPLY TO EDUCTORS
60. CONT SPRAY PUMPS, SUCTIONPIPING. RWST EDUCTORSUCTION
61. SPRAY ADDITIVE TANK ANDUNISOLABLE PIPING
62. CONTAINMENT FAN COOLER CCW
SUPPLY 8 RETURN, SPEC K2PIPING
21
21,22
23
23
23
23
23
27 32
IWC-5222 (a)
IWC-5222 (a)
IWC-5222 (c)
IWC-5222 (a)
IWC-5221
IWC-5222 (a)
IWC-5221
IWC-5222 (a)
IWC-5221
IWC-5222 (b)
IWD-5223 (a)
IWD-5221/5222
563
750
NONE REQ'D
325
INS/FUNCT
TANK FILLED
INS/FUNCT
TANK FILLED
INS/FUNCT
5.5
INS/FUNCT
~ PSV- 450, NOTE 1
PSV= 600; NOTE 1
SPRAY RING NOZZLES FLOW TESTPERFORMED EVERY 5 YEARS
PSV . 260
RWST
RWST; REQUEST FOR RELIEF 81
PG 5; NOTE 1
REQUEST FOR RELIEF 82 AND 03
PGandE
EN YEAR EXAMINATION SUMMARY
SME SECTION XI SYSTEMS - CLASS 2
DIABLO CANYON POWER PLANT-UNIT 2
R SSU
TEST SUMMARY
PAGE 9 of 9
PNN RPPING S M
ESCRI PTION
3. CONTAINMENT FAN COOLERS
64. REACTOR COOLANT PUMPS CCW
SUPPLY & OIL COOLER RETURN
CONTAINMENT PENETRATIONS,SPEC K2
65. REACTOR COOLANT PUMPS CCW
RETURN CONTAINMENTPENETRATION, LINE 2K17-.1357-6
66. EXCESS LETDOWN HEATEXCHANGER, SHELL SIDE
67. EXCESS LETDOWN HEATEXCHANGER, SHELL SIDE
SHEE
No.(1)
27»32
29
29
31
31
C DE
REQUIREMENT(2)
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223-a
IW0-52221/5222
RQ RD TSTEST PRESS FREQ(4)(PSIG) (3)
INS/FUNCT P
INS/FUNCT P
3106
INS/FUNCT P
INS/FUNCT
INS/FUNCT P
REMARKS
REQUEST FOR RELIEF 82 AND g3
REQUEST FOR RELIEF g2 AND 83
PSV- 2485, REQUEST FOR RELIEF 83
r
REQUEST FOR RELIEF f2 AND 83
REQUEST FOR RELIEF 02 AND k'3
PGandE DIABLO CANYON POWER PLANT-UNIT 2
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 3
PNN R PN S
DESCRIPTIONSH
No.(1)C D
REQUIREMENT(2)RD. S
TEST PRESS FREQ(4)'PSIG) (3)
TEST SUMMARY
PAGE L of 4
REMARKS
1. AUXILIARY FEEDWATER PUMPS
DISCHARGE PIPING
2. AUXILIARY FEED PUMPS RECIRCHEADER TO CONDENSATE STORAGE
TANK
3. AUXILIARY FEED PUMP TURBINECOOLING WATER PIPING
4. AUXILIARY FEEDWATER PUMPS
SUCTION PIPING, AND CHEMICALINJ
5. AUXILIARY FEED PUMP TURBINESTEAM SUPPLY 8 TRAP DRAIN
6. AUX FEED PUMP TURBINEEXHAUST AND LEAKOFF DRAINS
3,4
IWD-5223 (a)
IWD-'5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (b)
IWD-5221/5222IWD-5223 (a)
IWD-5221/5222
IWD-5223 (c)
IW0-5221/5222
1331
INS/FUNCT P
INS/FUNCT I
INS/FUNCT P
INS/FUNCT
INS/FUNCT P
TANK FILLED I
INS/FUNCT1331
INS/FUNCT P
NONE REQ'0
INS/FUNCT P
PS V1065
NO SAFETY VALVE IN SYSTEM - TESTED
AT NORMAL OPERATING CONDITIONS
NO SAFETY VALVE IN SYSTEM '- TESTED
AT NORMAL OPERATING CONDITIONS
REQUEST FOR RELIEF 81; NO SAFETY
VALVE IN SYSTEM - TESTED AT NORMAL
OPERATING CONDITIONS; CONDENSATE
STORAGE TANKS
PSV= 1065
UNIMPAIRED FLOW DEMONSTRATED MONTHLY
BY STP M-6B 8L EVERY 5 YEARS BY STP
M-6A
T
PGandE
~0
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 3
EM PRESSURS
TEST SUMMARY
PAGE 2 of 4
DIABLO CANYON POWER PLANT-UNIT 2
MP N NG
DESCRIPTION No.(l) REQUIREMENT(2) TEST PRESS
(PSIG) (3)FREQ(4)
REMARKS
7. COMPONENT COOLING WATER
PUMPS
I
8. COMPONENT COOLING WATER
HEAT EXCHANGERS (SHELL SIDE)
9. COMPONENT COOLING WATER
SURGE TANK
10. COMPONENT COOLING WATER
SUCTION 8 DISCHARGE PIPING,HEADERS A, B 8 C, SUPPLY 8I
RETURN PIPING FROM COM-
PONENTS WITH THE EXCEPTIONOF ITEM NUMBER ll
11. 'REACTOR COOLANT PUMP
THERMAL BARRIER CCW RETURN
8 SUPPLY FROM CHECK VALVES,SPEC K17
12. CONDENSATE STORAGE TANKAND UNISOLABLE PIPING
25
25
25
25,32
29
33
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
~ IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (b)
IWD-5221/5222
INS/FUNCT
INS/FUNCT
38
INS/FUNCT
INS/FUNCT
3106
INS/FUNCT
TANK FILLE
INS/FUNCT
REQUEST FOR RELIEF f2
REQUEST FOR RELIEF 82
PSV 30 Ps|d
REQUEST RELIEF 82
PSV— 2485
PGandE DIABLO CANYON POMER PLANT-UNIT 2
EN YEAR EXAMINATION SUMMARY
SHE SECTION Xl SYSTEMS - CLASS 3
N R N
ESCRIPTION
13. FIRE MATER TRANSFER TANK
14. NKEUP WATER TRANSFERPUMPS AND SUCTION PIPING
15. HU MATER TRANSFER PUMPS
DISCHARGE PIPING
I6. CCW AND SPENT FUEL PITSYSTEN PRIHARY WATER MAKEUP
PIPING
17. AUXILIARYSALTWATER PUMP
SUPPLY TO CCW HEATEXCHANGERS
18. COMPONENT COOLING MATER
HEAT EXCHANGERS TUBE SIDE
19. CCM HEAT EXCHANGERS
SALTWATER OUTLET PIPING
No.(1)
33
33,36
26a33
24,3425
35
35
35
0REQUIREMENT(2)
IWD-5223 (b)
IWD-522I/5222
IWD-5223 (b)
IMD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IMD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (a)
IWD-5221/5222
IWD-5223 (c)
IWD-5221/5222
R
TEST PRESS(PSIG) (3)
TANK FILLED
INS/FUNCT
TANK FILLED
INS/FUNCT
INS/FUNCT
INS/FUNCT
INS/FUNCT
INS/FUNCT
INS/FUNCT
INS/FUNCT
-INS/FUNCT
INS/FUNCT
NONE REQ'D
INS/FUNCT
FREQ(4)
TEST SUtMRYPAGE 3 of 4
RBNRKS
REQUEST FOR RELIEF 01; NO SAFETY VALVEIN SYSTEM - TESTED AT NORMAL OPERATINGCONDITIONS; CONDENSATE STORAGE TANK
NO SAFETY VALVE IN SYSTEM - TESTED ATNORMAL OPERATING CONDITIONS
NO SAFETY VALVE IN SYSTEN - TESTED ATNORMAL OPERATING CONDITIONS
/
REQUEST FOR RELIEF 84; TESTED AT MAXPHP DISCH PRESSURE
REQUEST FOR RELIEF i4
TESTED AT MAX PHP DISCH PRESSURE
REQUEST FOR RELIEF 84
PGandE
~0
TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS - CLASS 3
S EM PRESSURES
TEST SUMMARY
PAGE 4 of 4
DIABLO CANYON POWER PLANT-UNIT 2 -P
MPNN RPPING S
DESCRIPTIONSH E
No. (1)D R RD 'S
REQUIREMENT(2) TEST PRESS FREQ(4)(PSIG) (3)
REMARKS
20. DIESEL ENGINE JACKET WATER
COOLING SYSTEM
37 IWD-5223 (a) 7.5
IWD-5221/5222 INS/FUNCT P
PS>= 6
PGandE
/DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMSREQUEST FOR. RELIEF FROM CODE REQUIREMENTS
SYSTEM PRESSURETEST SUMMARY
PAGE 1 of 4
NO.SYSTEM OR COMPONENT
DESCRIPTIONCODE
CLASSSUM.
'TEM
NO.
BASIS FOR REQUESTINGRELIEF
TESTING IN LIEUOF REQUIREMENTS
TESTINGSCHEDULE
CENTRIFUGAL TYPE PUMPS-VARIOUS
,1924465360
14
PUMP MECHANICAL SEALSWILL NOT PERMIT HYDRO
PRESSURES ABOVESUCTION PIPING TESTPRESSURE.
ESTABLISH HYDRO
BOUNDARY INACCORDANCE WITH1980 ASME
SECTION XI IWA-5224 (d).
TESTING.TO BESPECIFIEDUNDER TESTFREQUENCY INTHE SUNtNRY.
COMPONENT COOLING WATER
SYSTEM
6263646667
78
10
SYSTEM VALVES ARE NOT
DESIGNED TO WITHSTANDTHE DIFFERENTIALPRESSURES WHICH WOULD
BE DEVELOPED AT THEPRESSURES REQUIRED FOR
PERFORMANCE OF THEHYDROSTATIC PRESSURETESTS.
(1) VISUALLEAK CHECK
DURING NORMALSYSTEII,
OPERATION
(2) ANALYSISOF WATERCHEMISTRY
EACHINSPECTIONPERIOD
WEEKLY
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMSREQUEST FOR RELIEF FROM CODE REQUIREMENTS
SYSTEM PRESSURE
TEST SUMMARY
PAGE 2 of 4
NO.SYSTEM OR COMPONENT
DESCRIPTION
COMPONENT COOLING WATER
PIPING ASSOCIATED WITHCONTAINMENT, PENETRATIONS.
CODE
CLASSSUM.ITEM.NO.
6263.64656667
. BASIS FOR REQUESTINGRELIEF
THE COMPONENTS, PIPINGAND VALVES ASSOCIATEDWITH CONTAINMENT PENE-TRATIONS ARE CLASSIFIEDCODE CLASS 2 SOLELY ON
THE BASIS THAT THEY ARE,REQUIRED TO ENSURE CON-TAINMENT INTEGRITY.THEY HAVE NO OTHERSAFETY FUNCTION THATWOULD REQUIRE A CODE
CLASS 2 CLASSIFICATION.IN ADDITION TO THE CON-TAINMENT ISOLATIONFUNCTION, THE PIPINGHAS OTHER SAFETYFUNCTIONS WHICH COULD
REQUIRE IT TO BE CODE
CLASS 3. ANY TESTINGAND INSPECTION OF THESECOMPONENTS, PIPING ANDVALVES SHOULD, THEREFORE,BE CONSISTENT WITH RE-VISION (1980 EDITION)OF ASME SECTION XI,SUBSECTION IWA-1300.
TESTING IN LIEUOF REQUIREMENTS
THE COMPONENTS,'IPING,AND
VALVES ASSOCI-ATED WITH CON-TAINMENT PENE-TRATIONS WILLBE TESTED ANDINSPECTED,SUBJECT TO ANYREQUESTS FOR
RELIEF, INACCORDANCEWITH THEREQUIREMENTSOF ASME SECTIONXI, SUBSECTIONIWD, 1977EDITION-SUMMER 1978ADDENDA
TESTINGSCHEDULE
TESTING TO B
AS SPECIFIEDUNDER TESTFREQUENCY INTHE SUMMARY.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMSREQUEST FOR RELIEF FROM CODE REQUIREMENTS
SYSTEM PRESSURE
TEST SUMMARY
PAGE 3 of 4
NO.SYSTEM OR COMPONENT
DESCRIPTIONCODE
CLASSSUM.ITEMNO.
BASIS FOR REQUESTINGRELIEF
TESTING IN LIEUOF REQUIREMENTS
TESTINGSCHEDULE
EMBEDDED AUXILIARYSALTWATER PIPING
1719
THE MAJORITY OF ASW
PIPING IS UNDERGROUND
AND NOT ACCESSIBLEFOR INSPECTION AND/ORTESTING. P RES ERV ICE
TESTING WAS NOT
REQUIRED BY CONSTRUC-'. TION CODE.
VISUAL LEAK TESTOF EXPOSED POR-TIONS OF SYSTEM,DURING SYSTEMPRESSURE TESTSAS SPECIFIED INTHE SUMMARY
PERIODIC PUMP
TESTING WILLVERIFY UNIM-PAIRED FLOW
THROUGH THEINACCESSIBLEPORTIONS OF THESYSTEM.
TESTING TO BEAS SPECIFIEDUNDER TESTFREQUENCY INTHE SUMMARY.
TESTING TO B
AS SPECIFIEDIN THE PUMP
INSERVICETESTINGPROGRAM.
CLASS 2 SAFETY INJEC-TION, RESIDUAL HEAT
PCP SEAL INJECTION,CHARGING AND BORON
INJ PIPING
152326343839495052
SOME OF THE PIPING ISNOT ISOLABLE FROM THE
CLASS 1 PIPING.
THE UNISOLABLEPORTIONS WILLBE TESTED ATTEST PRESSURESDETERMINED BY
THE CLASS 1
REQUIREMENTS.
TESTING TO B
AS SPECIFIEDUNDER TESTFREQUENCY INTHE SUMMARY.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2TEN YEAR EXAMINATION SUMMARY
ASME SECTION XI SYSTEMS
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
SYSTEM PRESSURE
TEST SUMMARY
PAGE 4 of 4
NO.
SYSTEM OR COMPONENT
DESCRIPTION
RCP SEAL RETURN PIPINGFROM 2-8141A,B,C,D TO THE
RCP SEALS
RHR PUMP SUCTION FROM
CONTAINMENT SUMPS
CODE
CLASSSUM.ITEMNO.
.12 =
41
BASIS FOR REQUESTINGRELIEF
PIPING IS NOT ISOLABLEFROM THE RCP SEALS AND
CANNOT BE INCLUDED INTHE HYDROSTATIC PRESSURE
TEST BOUNDARY. THE PIP-ING IS PRESSURIZED DURINGNORMAL REACTOR OPERATIONAND ANY LEAKAGE WOULD BE
DETECTED DURING OPERATION
PIPING IS OPEN ENDED TO
THE CONTAINMENT AND CAN-NOT BE ISOLATED TO PER-
TESTING IN LIEUOF REQUIREMENTS
NONE
NONE
TESTINGSCHEDULE
NONE
NONE
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMHON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGPUMP PROGRAM
PAGE 1 OF 3
Rev- ct. 1
EThe attached sheets. identify the Unit 2, and colon system pumps that are subject to the testing requirements ofSection XI, Subsection IWP and the requests for relief from code requirements. This program shall be in effectthroughout the first inservice test interval.
LEGENO:
TEST FREQUENCY NOTATION
Notation
TEST PARAMETER NOTATION
Notation
Pi
Dp
Vv
Tb
~Fre uenc
At least once per 92 days
At least once per 366 days
Not applicable
Parameter
Pump Speed (if variable speed)
Pump Inlet Pressure
Pump Differential Pressure
Flow Rate
Pump Vibration (velocity)
Pump Lubrication (observe level or pressure)I
Pump Bearing Temperature
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGPUMP PROGRAM
PAGE 2 OF 3
I
PUMP NAME AND NUMBERCODE TESTCLASS PROCEDURE
TEST PARAMETER AND FREQUENCY
N Pi Dp Q Vv L TbREQUEST FOR
RELIEF REMARKS
Safety Injection Pump 1
Safety Injection Pump 2Centrifugal Charging Pump 1
Centrifugal Charging Pump 2Residual Heat Removal Pump 1
Residual Heat Removal Pump 2Containment Spray Pump 1
Containment Spray Pump 2Auxiliary Feed Pump 2 (Mtr)Auxiliary Feed Pump 3 (Mtr)Auxiliary Feed Pump 1 Turb)Auxiliar Saltwater Pum 1PAuxiliary Saltwater Pump 2Component Cooling Water Pump 1
Component Cooling Water Pump 2Component Cooling Water Pump 3Diesel FO Transfer Pump 01Diesel FO Transfer Pump 02Boric Acid Transfer Pump 1
Boric Acid Transfer Pump 2MU Water Transfer Pump OlMU Water Transfer Pump 02Reciprocating Charging Pump 3
2222222233333333
IWPIWP
22332
P-18P-18P-28P-28P-38P-38P-48P-48P-58P-58P-68P-78P-78P-88P-88P-88P-128P-128P-148P-148P-158P-158P-178
NAQ'A
QNA Q
NA QNA QNA Q
NA QNA QNA Q
NA Q
Q Q
NA Q
NA Q.NA Q
NA QNA QNA NANA 'NA
NA QNA Q
NANA Q
Q Q
Q
Q
Q
QQ.Q
Q.
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
NA
Q
QNA
NA
Q
Q
Q
NANA
NA
Q
Q
Q
Q
QNANANANANANA
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
QQ-
Q A
Q A
Q AQ ANA NANA NA
Q A
Q A
Q AQ A
Q ANA NANA NA
Q A
Q A
Q ANA ANA A
A
Q A
Q A
Q A
Q A
Pl, 2. 3 .
81, 2, 381, 2, 481, 2, 481, 281, 281, 2, 381, 2, 381, 2, 481, 2, 481, 2. 4Ol, 281, 2Pl, 281, 201, 281, 2, 4, 581, 2, 4. 581, 2, 481, 2, 481, 2, 481, 2. 4fl. 6
*Dp > 1455 psid*Dp > 1455 psid*Dp > 2400 pseud*Dp > 2400 psid«Dp > 165 psid*Dp > 165 psid*Dp > 205 psid*Dp > 205 psid*Dp > 1370 psid*Dp > 1370 psid*Dp > 1312 psid
See Note 81See Note flSee Note 81Test Per IWPTest Per IWP
See Note 82
*Per Tech. Spec.
r
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
NOTES
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGPUMP PROGRAM
PAGE 3 OF 3
1 The Component Cooling Water Pump Inservice Test is performed by operating a single pump and measuring flow, thencomparing it to the required differential pressure indicated on a pump test curve.
This pump test curve is actually a "family" of curves that includes a reference or manufacturer's curve with"alert" and "action" curves for both the high and low limits. The limit curves are generated using the "Allow-able Ranges of Test Quantities" Table IWP-3100-2.
A variable flow measurement is required because of the difficulty in establishing a single test flow rate on asystem that has varying heat loads and therefore varying flow requirements.
2 The Reciprocating Charging Pump is included in the pump program as an ~o tional motive force for emergencyboration. If this pump is removed from service, ASME Section XI pump test need not be performed.
PGandE
DIABLO CANYON POMER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
RE(VEST FOR RELIEF FROM CODE REQUIREMENTS
DIABLO CANYON POMER PLANT-UNIT 2
INSERVICE TESTINGPUMP PROGRAM
PAGE 1 OF 5
Rev-0 (Oct. 1984)
PUMP NAME, NUMBER ANDFUNCTION
1 All Pumps in Program
These pumps function inshutting down the reactoror in mitigating theconsequences of an accident.
CODE
CLASS
2 or 3
CODE
REQUIREMENTS
IMP-3400Frequency ofInservice Tests
BASIS FOR RE(VESTING RELIEF ANDTESTING IN LIEU QF RE(UIREMENTS
Relief is requested to perform inservicetests on pumps "at least one per 92 days"instead of the "at least once per 31 days"frequency required by ASME Section XI 1977Edition (Addenda through Su@ver 1978).
In accordance with 10CFR50.55a Paragraph (g)Subparagraph (4)(IV), the Inservice Tests ofPumps "may meet the requirements set forthin subsequent editions and addenda that areincorporated by reference in paragraph (b)of this section...". Paragraph (b) Subpara-graph (2) references ASME Section XI, 1980Edition (Addenda through Minter 1980).
The newer requirements of subsection INP-3400of ASME Section XI, specifies Inservice PumpTests to be run every 3 months.
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
RE(UEST FOR RELIEF FROM CODE REQUIREMENTS
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGPUMP PROGRAM
PAGE 2 OF 5
PUMP NAME, NUMBER ANDFUNCTION
CODE
CLASSCODE
REQUIREHENTSBASIS FOR RE(UESTING RELIEF AND
TESTING IN LIEU OF REQUIREMENTS
All pumps in program (exceptReciprocating charging pump 3)These pumps function inshutting down the reactoror in mitigating theconsequences of an accident.
2ol 3 IWP-3100, 3200 and4500 specifies thatvibration amplitudewill be used as oneof the pump bearingcondition indicators.
Velocity is a better indication of vibrationseverity because it accounts for both thedisplacement of the vibration and the rateor the frequency of displacement. Both ofthese parameters must be considered whendetermining the susceptibility of malfunc-tion due to fatigue, the lead cause ofmechanical failure.
For any unique frequency, vibration velocitycan be related to displacement amplitude by:
Vpeak = 52.3D (F/1000) X 10
Where Vpeak = vibration velocity in inchesper second, peak
D = peak to peak displacement inmils
F = frequency, cycles per minute
Using this relationship, conservative accept-ance criteria have been derived which can berelated directly to the code-specified limitson displacement.
Consider the case of a degraded anti-friction,(ball) bearing. Displacement readings may notindicate the existence of an unacceptable con-dition, however, velocity, which accounts fordisplacement, and.in this case the high fre-quency of ball rotation would indicate problem.
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUHP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGPUMP PROGRAM
PAGE 3 OF 5
PUHP NAME, NUMBER ANDFUNCTION
CODE
CLASSCODE
REQUIREMENTSBASIS FOR REQUESTING RELIEF AND
TESTING IN LIEU OF REQUIREMENTS
3 Safety Injection PumpsNo. 1 and 2.
These pumps function to supplywater to the reactor coolantsystem, in the event of a lossof coolant accident.
Containment Spray PumpsNo. 1 and
2.'hese
pumps function tosupply water. containingNAOH to the containmentatmosphere to removeheat and airbornefission products.
IWP-4100, 4140 and4600 require theuse of a calibratedflow instrument.
Relief is requested from calibration of flowmeters FI-973 and FI-929. These instrumentsare variable-area head-type flow meterswhose response and accuracy are used in theinservice test of the pumps, to provide veri-fication of test/recirculation flow througha fixed resistance flow path.
These flow meters shall be observed to func-tion properly during each pump test.
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREHENT
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGPUMP. PROGRAM
PAGE 4 OF 5
PUMP NAME, NUMBER ANDFUNCTION
4 Centrifugal Charging PumpsNo. 1 and 2
Auxiliary Feedwater PumpsNo. 1, 2, and 3
Diesel FO Transfer PumpsNo. Ol and 02
Boric Acid Transfer PumpsNo. 1 and 2
MU Water Transfer PumpsNo. 01 and 02
These pumps function inshutting down the reactoror in mitigating theconsequences of an accident.
CODE
CLASSCODE
REQUIREMENTS
IWP-3100, 4100 and4600 require themeasurement of flowrate.
BASIS FOR REQUESTING RELIEF AND
TESTING IN LIEU OF REQUIREMENTS
Relief is requested from the measurement offlow rate on these pumps.
Instrumentation for measurement of the testflow rate was not provided in the systemdesign.
These pumps are tested on fixed resistanceflow paths. As such, the pump differentialpressure is determined and the flow rate,though not calculated, can be evaluated.Since the flow paths utilized for inservicetesting are fixed resistance paths, pumpdifferential pressure will give direct indi-cation of pump, and therefore, flow ratedegradation.
dIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 19?8)
REQUEST FOR RELIEF FROM CODE REQUIREMENT
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGPUMP PROGRAM
PAGE 5 OF 5
PUMP NAME. NUMBER AND
a FUNCTIONCODE
CLASSCODE
REQUIREHFNTSBASIS FOR REQUESTING RELIEF AND
TESTING IN LIEU OF REQUIREMENTS
5 Diesel FO Transfer PumpsNo. Ol and 02
These pumps function tosupply fuel oil from thediesel fuel oil storagetank to the individualdiesel day tanks.
IWP-3100 requiresthe measurement ofpump inlet pressure
Relief is requested from the measurementof pump inlet pressure. Instrumentationfor measurement of the pump inlet was notprovided in the system design. These arepositive displacement pumps and measurementof a constant discharge pressure will indi-cate no problem in the suction line duringthe fixed flow pump test.
6 Reciprocating Charging PumpNo. 3
This pump functions as an~o tional motive force foremergency boration.
IWP-3100, 3200 and4240 require a pumpdifferential pres-sure measurement.
Relief is requested from the measurement ofpump differential pressure because pump dis-charge is meaningless at low RCS pressures.If the positive displacement pump flow rateis acceptable at test pressure the pumpshall be acceptable.
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SU01ER 1978)
r
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 1 OF 52
Rev- ct. 8
The attached sheets identify the Unit 2 and common system valves that are subject to the testing requirementsof Section XI, Subsection IWV and the requests for relief from code requirements. This program shall be in effectthroughout the first inservice test interval.
LEGEND:
VALVE CLASS (VLV CLS)ASME CODE CLASS TAKEN FROM DWG 104628 CHANGE 5, "ASNE CODE BOUNDARIES FOR INSERVICE INSPECTIONAND TESTING PROGRAM". tT,S. indicates a non ASNE code class valve that is required to be testedby Technical Specification. IMV indicates a non ASNE code class valve that is required to betested in accordance with ASHE Section XI, Subsection IWV]
VALVE CATEGORY (VLV CAT)ASHE IWV-2200 VALVE CATEGORIES
VALVE SIZE (VLV SIZ)ASME SIZE IN INCHES
VALVE TYPE (VLV TYP) NOTATION
NOTATION TYPE
BA
BV
CK
DI
GA
GL
PL
RV
Ball Valve
Butterfly Valve
Check Valve
Diaphragm Valve
Gate Valve
Globe Valve
Plug Valve
Relief Valve
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
LEGEND: (cnn't.)
ACTUATOR 'TYPE (ACT TYP) NOTATION
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 2 OF 52
NOTATION TYPE
Air Operated
Electric Motor
Electrohydraulic
Manual
None
Solenoid Operated
NORMAL POSITION (NRM POS) DURING OPERATION AT POWER, NOTATION
NOTATION
LO
LC
POSITION
Open
Closed
Locked, Sealed, or De-Energized (Breaker Open) Open
Locked, Sealed, or De-Energized (Breaker Open) Closed
Variable
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 3 OF 52
LEGENO: (con't ).
TEST REQUIREMENT (TEST REQ) NOTATION
NOTATION
EC
EF
EP
EH
FS
LT
PI
RT
RE UIREHENT
Exercise of Check Valve - Full Stroke
Exercise of Valve - Full Stroke
Exercise of Check Valve or Valve - Partial Stroke
Mechanical Exercise of Check Valve/Disassembly InspectionFail Safe Test
Valve Leak Test
Position Indication Test
Test Per ASME PTC - 25.3-1976 for Safety and Relief Valve
TEST FREQUENCY
NOTATION
Q
R
2A
CS
T
5A
(TEST FRQ) NOTATION
~FNE UENCY
At least once per 92 days
At least once per 18 months (refueling)At least once per 24 months
At least each cold shutdown but not more more frequent than once per 92 days
(This notation identifies valves that cannot be exercised during plantoperation. A statement of the technical justification for not full strokeexercising these valves during plant operation is included as an attachmentto the "Request For Relief From Code Requirements" Section of the program).Per IWV 3511
At least once per 5 years
PGandE
DIABLO CANYON POMER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 4 OF 52
LEGEND: (can')STROKE TIME (STR TIM)
STROKE TIME GIVEN IN SECONDS FOR OPENING AND IN SECONDS FOLLONED BY A 'c'OR CLOSING.
RELIEF REQUEST (REL REQ)
RELIEF REQUEST NUMBER GIVEN IN REFERENCE TO REQUESTS AT THE END OF THE PROGRAM.
PROCEDURE NUMBER (PROC NO.)
IDENTIFIES PROCEDURE USED TO MEET TEST REQUIREMENT.
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COHHON PUHP AND VALVE TESTING PROGRAH
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAHPAGE 5 OF 52
VALVENUMBER
OW RSS
VALVEDESCRIPTION
PB IDCO-ORD
P5 N. 10
VLV VLV VLV VLV ACT NRH
CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
H NGE
STRTIH
RELRE
PROC
NO. REHARKS
NONE AUX FP-1 SUCT CK RWS
NONE AUX FP-2 SUCT CK CST
NONE AUX FP-3 SUCT CK'CST
NONE
NONE
NONE
NONE
NONE
AUX FP-2 8 3 SUCT CK RMS
AUX FP-1 RECIRC CK
AUX FP-2 RECIRC CK
AUX FP-3 RECIRC CK
AUX FP-1 DISCH CK
NONE AUX FP-2 DISCH CK
, NONE AUX FP-3 DISCH CK
NONE SG-2 FM CK
NONE SG-1 FW CK
NONE AUX FP-1 TO SG-1 CK
N NE SG- W
NONE SG-4FW CK
NONE AUX FP-1 SUCT CK CST
41-C
42-D
3 C 8 CK N C
3 C 6 CK N C
42-D 3 C 6 CK N C
41-D
43-C
43-D
44-p
44-C
3 C
3 C
3 C
3 C
3 C
8 CK N
15 CK N
15 CK N
15 CK N
6 CK. N
44-D 3 C 4 CK N C
44-D 3 C 4 CK N C
47-A
47-C
2 C 16 'K N 0
2 C 16 CK N 0
2 C 3 CK N C
4 16 C N
47-A 2 C 16 CK N 0
42-C 3 C 8 CK N C
EC
EP
EC
EH
EP
EC
EP
EC
EH
EC
EC
EC
EP
EC
EP
EC
EP
EC
EC
EC
EP
EC
S
CS
Q
CS
5A
Q
CS
Q
CS
5A
Q
Q
Q
Q
CS
CS
Q
CS
CS
CS
Q
CS
N
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
81
81
- P
V-3P3
P-6B
P-6B
V-18
P-5B-
P-5B
P-5B
P-5B
V-18
P-6B
P-5B
P-58
P-6B
P-6B
P-5B
P-58
P-5B
P-58
V-3P3
V-3P3
P-6B
P6B
--5FW-2-532
FW-2-348
FW-2-349
FM-2-350
FM-2-352
FW-2-353
FW-2-354
FM-2-355
FW-2-356
FM-2-361
FM-2-362
FW-2-363
FM-2-367
FM-2-36&
FM-2-369
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COHHON PUMP AND VALVE TESTING PROGRAH
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUHHER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTING
VALVE PROGRAH
PAGE 6 OF 52
FEEDWATER SYSTEH P 8 ID NO. 1080 03 CHANGE 4
VALVE VALVENUHBER DESCRIPTION
NONE AUX FP-1 TO SG-2 CK
NONE AUX FP-2 TO SG-2 CK
NONE AUX FP-1 TO SG-3 CK
NONE AUX FP-3 TO SG-3 CK
NONE AUX FP-1 TO SG-4 CK
NONE AUX FP-3 TO SG-4 CK
NONE SG-1 AUX FW 1ST CK
NONE SG-2 AUX FM 1ST CK
NONE SG-3 AUX FM 1ST CK
47-C 2 C 3 CK
47 0 2 C 3 CK
47-B 2 C 3 CK
47-C 2 C 3 CK
47-B 2 C 3 CK
47-C 2 C 3 CK
49-B 2 C 3 CK
48-B 2 C 3 CK
48-B 2 C 3 CK
N
N C
N C
N C
N C
N C
N C
N C
N C
N C
P 5 ID VLV VLV- VLV VLV ACT NRHCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
EC
EP
EC
EP
EC
EP
EC
EP
EC
EP
EC
EP
EC
EP
EC
EP
EC
EP
EC
TSTFR
CS
CS
CS
Q
CS
CS
CS
Q
CS
Q
CS
CS
Q
CS
STRTIH
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA.
NA
NA
NA
NA
NA
NA
RELRE
PROC
NO. REtNRKSW--
P-5B
P-6B FW-2-371
P-6B
P-5B FW-2-372
P-5B
P-68 FM-2-373
P-6B
P-5B FW-2-374
P-5B
P-6B FW-2-375
P-6B
P-5B FM-2-376
P-5B
P-5B FM-2-377
P-5B
P-5B FW-2-378
P-5B
P-5B FW-2-379
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 7 OF 52
E DW ER S ST P 5 ID N . 1 8 03 CH NGE
VALVE VALVE.NUMBER DESCRIPTION
NONE SG-4 AUX FW 1ST CK
2FCV-436 RWS SUP AUX FP-1
FCV-437 RWS SUP AUX FP-2 8I 3
FCV-438 SG-1 FW ISO
FCV-439 SG-2 FW ISO
FCV-440 SG-3 FW ISO
FCV-441 SG-4 FW ISO
LCV-106 AUX FP-1 TO SG-1 REG
LCV-107 AUX FP-1 TO SG-2 REG
LCV-108 AUX FP-1 TO SG-3 REG
LCV-109 AUX FP-1 TO SG-4 REG
LCV-110 AUX FP-2 TO SG-1 REG
48-B 2 C 3 CK
41-C 3 B 8 BV
41-D 3 8 8 BV
48-A 2 B '6 GA
47-A 2 B 16 GA
47-A 2 B 16 GA
48-A 2 B 16 GA
47-C 2 B 3 PL
47-C 2 B 3 PL
47-B 2 B 3 PL
47-B 2 B 3 PL
47-D 2 B 2 PL
N C
E C
E C
E 0
E 0
E 0
E 0
E 0
E 0
E 0
E 0
H 0
P 5 ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
EP
EC
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
TSTFR
Q
CS
2A
Q
2A
2A
CS
2A
CS
2A
CS
2A
CS
2A
Q
2A
Q
2A
Q
2A
2A
Q
STRTIM
NA
NA
NA
30
NA
30
NA
60c
NA
60c
NA
60c
NA
60c
NA
20
NA
20
NA
20
NA
20
NA
40
RELRE
PROC
NO.
P-5B
P-58
V-ZU
V-'3P4
V-2U
V-3P4
V-2U
V-3P2
V-2U
V-3P2
V-2U
V-3P2
V-2U
V-3P2
V-2U
V3P5
V-2U
V-3P5
V-28
V-3P5
V-2B
V-3P5
V-2U
V-3P6
REMARKS
FW-2-380
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 8 OF 52
FED R PA DN.1 3 N
VALVENUMBER
VALVEDESCRIPTION
P 8I ID VLV VLV VLV VLV ACT NRM TST TST STR REL PROC
CO-ORD CLS .CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
LCV-111 AUX FP-2 TO SG-2 REG
LCV-113 AUX FP-3 TO SG-4 REG
LCV-115 AUX FP-3 TO SG-3 REG
47D 2 - 8 2 PL H 0 PI
EF
47C 2 B 2 PL H 0 P IEF
47C 2 B 2 PL H 0 P IEF
2A NA
Q 40
2A NA
Q 4O
2A NA
Q 40
V-2U
V-3P6
V-2B
V-3P6
V-2B
V-3P6
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COtSON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT.-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 9 OF 52
URB N S EAM SUPPLY S S EH PA IDN. 180 4 H NGE
VALVEVALVE'UMBER
DESCRIPTIONP 8 ID VLV VLV VLV VLV ACT NRHCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TST STRFR TIN
RELRE
PROC
NO. REMARKS
NONE
NONE
NONE
NONE
NONE
NONE
FCV-22
SG-1 HS LINE CHECK VALVE
SG-2 HS LINE CHECK VALVE
SG-3 HS LINE CHECK VALVE
SG-4 HS LINE CHECK VALVE
SG-2 STH TO AUX FP-1 CK
SG-3 STH TO AUX FP-1 CK
SG-4 HSIV BYPASS
FCV-23 SG-3 HSIV BYPASS
FCV-24 SG-2 HSIV BYPASS
FCV-25 SG-1 HSIV BYPASS
FCV-38 SG-3 STH TO AUX FP-1
FCV-37 SG-2 STH TO AUX FP-1
31-A
31-B
31-D
31-E
30-8
31-C
31-E
IWV C
IWV C
IWV C
'IWV C
2 C
2 C
2 - B
31C 2 B
31-B 2 B
30-B 2 B
31C 2 B
31-A 2 B
28 CK
28 CK
28 CK
28 CK
4 CK
4 CK
3 GL
3 GL A
3 GL A
3 GL A
4 GA E
4 GA E
0
0
0
. 0
C
C
C
C
C
C
0
0
EH
EH
EH
EH
EC
EC
FS
EF
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
EF
PI
EF
5A
5A
5A
5A
Q
Q
2A
Q
2A
Q
Q
2A
Q
2A
Q
Q
2A
2A
Q
NA
NA
NA
NA
NA
NA
NA
NA
10C
NA
-NA
10C
NA
NA
10C
NA
NA
10C
NA
10
NA
10
¹2¹2¹2¹2
V-18
V-18
V-18
V-18
P-6B
P-6B
V-2U
H-16P
M-16P
V-2U
H-16P
H-16P
V-2U
H-16P
H-16P
V-2U
H-16P
H-16P
V-2U
H-16N
V-2U
H-16N
HS-2«1068
HS-2-2066
HS-2-3062
HS-2-4062
HS-2-5166
HS-2-5167
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUh1HER 1978)
UBN
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAH
PAGE 10 OF 52
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRH TSTCO-ORD CLS CAT SIZ TYP TYP POS RE
TSTFR
STRTIH
RELRE
PROC
NO. REMARKS
FCV-41 SG-1 HS IV-
FCV-42 SG»2 HSIV
FCV-43 SG-3 HSIV
FCV-44 SG-4 MSIV
FCV-95 AUX FP-1 STH SUP
FCV-151 SG-1 BD ISO OC
31-A 2 B 28 CK A
31-D 2 B 28 CK A
31-E 2 B 28 CK A
31-B 3 B 4 GA E
72-C 2 B 3 GA A
31-B 2 B 28 CK A
0 PI
EP
FS
EF
PI
EP
FS
EF
PI
EP
FS
EF
PI
EP
FS
EF
PI
EF
PI
FS
EF
2A
CS
CS
2A
Q
CS
CS
2A
Q
CS
CS
2A
Q
CS
CS
2A
2A
Q
NA
5c
NA
NA
NA
5c
NA
NA
NA
5c
NA
NA
NA
5c
NA
15
NA
NA
10c
V-2U
V-10
V-3R2
V-3R2
V-2U
V-10
V-3R2
V-3R2
V-2U
V-10
V-3R2
V-3R2
V-2U
V-10
V-3R2
V-3R2
V-2B
M-16N
V-2J
V-3S2
V-3S2
PGandE
DIABLO CANYON POWER 'PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE ll OF 52
URB N EAM UPPL S S P& N. 1 04 CH N
VALVE VAI VENUMBER DESCRIPTION
P & ID . VLV VLV VLV VLV ACT NRHCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIH
RELRE
PROC
NO. REMARKS
FCV-154 SG-2 BD ISO OC
FCV-157 SG-3 BD ISO OC
FCV-160 SG-4 BD ISO OC
FCV-244 SG-4 SAMPLE ISO OC
FCV-246 SG-3 SAMPLE ISO OC
FCV-248 SG-2 SAMPLE ISO OC
FCV-250 SG-3. SAMPLE ISO OC
72 C 2 B 3 . GA A
72-D 2 B 3 GA A
72-E 2 B 3 GA A
72-E 2 B .75 GA A
72-D 2 B .75 GA A
?2-C 2 B ;75 GA A
72-C 2 B .75 . GA A
PI
FS
EF
PI
FS
EF
PI
FS
EF
0 PI
FS
EF
2A
Q-
Q
2A
Q
2A
Q
2A
FS
EF
0 PI
FS
EF
Q
2A
FS Q
EF Q
0 PI 2A
NA
NA
10c
NA
NA
10c
NA
10c
NA
NA
10c
NA
NA
10c
NA
NA
10c
NA
NA
10c
V-2J
V-3S2
V-3S2
V-2J
V-3S2
V-3S2
V-2J
V-3S2
V-3S2
V-2J
V-3S2
V-3S2
V-2J
V-3S2
V3S2
V-2J
V-3S2
V-3S2
V-2J
V-3S2
V-3S2
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA TMROUGH SUMMER 1978)
INSERVICE TESTING
VALVE PROGRAM
PAGE 12 OF 52
TURBINE STEAN SUPPLY SYSTEM P 5 ID NO. 1080 04 CHANGE 6
VALVENUMBER
VALVEDESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
FCV-760 SG-1 BD ISO IC
FCV-761 SG-2 BD ISO IC
FCV-762 SG-3 BD ISO IC
FCV-763 SG-4 BD ISO IC
PCV-19 SG-1 IOX ATM DUMP
PCV-20 SG-2 10K ATH DUMP
71-C 2 B 3 GA A
71-C 2 B 3 GA A
71-D 2 B 3 GA A
71-E
30-A 2 B 8 PL A
30-C 2 8 8 PL A
2 B 3 GA A
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
FS
EF
2A
Q
Q
2A
Q
Q
2A
Q
Q
2A
Q
Q
2A
CS
CS
2A
CS
CS
NA
NA
10c
NA
NA
10c
NA
NA
10c
NA
NA
10c
NA
NA
120
NA
NA
120
V-2N
M-16P
H-16P
V-2N
H-16P
H-16P
V-2N
H-16P
H-16P
V-2N
M-16P
H-16P
V-2U
V-3R1
V-3R1
V-2U
V-3R1
V-3R1
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAH
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 13 OF 52
URBIN PPL S S E NO. 1 H N
VALVE VALVE.NUMBER DESCRIPTION
PCV-21 SG-3 10K ATH DUMP
PCV-22 SG-4 10K ATH DUMP
RV-3 SG-1 SAFETY VLV
RV-4 SG-1 SAFETY VLV
RV-5 SG-1 SAFETY VLV
RV-6 SG-1 SAFETY VLV
RV-7 SG-2 SAFETY VLV
RV-8 SG-2 SAFETY VLV
RV-9 SG-2 SAFETY VLV
RV-10 SG-2 SAFETY VLV
RV-11 SG-3 SAFETY VLV
RV-12 SG-3 SAFETY VLV
RV-13 SG-3 SAFETY VLV
RV-14 SG-3 SAFETY VLV
RV-58 SG-4 SAFETY VLV
RV-59 SG-4 SAFETY VLV
P 8 ID VLV VLV VLV = VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
31-D 2 B'
PL A
31-E, 2 B 8 =-PL A
30-A 2 C 10 RV
31-A 2 C 10 RV
31-A 2 C 10 RV
31-A 2 C 10 RV
30-B 2 C 10 RV
31-B 2 C 10 RV
31-B 2 C 10 RV
31-B 2 C 10 RV
31-D 2 C 10 RV
31-D 2 C 10 RV
32D 2 C 10 RV
31-D 2 C 10 RV
31E 2 C 10 RV
31-E 2 C 10 RV
TSTRE
PI
FS
EF
PI
FS
EF
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
TSTFR
2A
CS
CS
2A
CS
CS
T
T
T
T
T
=T
T
T
T
T
T
T
T
T
STRTIM
NA
NA
120
NA
NA
120
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
RELRE
PROC
NO.
V-2U
V-3R1
V-3R1
V-2U
V-3R1
V-3R1
M-77
H-77
M-77
H-77
M-77
H-77
M-77
H-77
M-77
M-77
M-77
H-77
H-77
M-77
REMARKS
10651K
10788$
10908
11038
10658
10788
10908
1103$
10650
10780
10908
11038
10658'0780
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
INSERVICE TESTING
VALVE PROGRAH
PAGE 14 OF 52
TURBINE STEAM SUPPLY SYSTEM P 8 ID NO. 1080 04 CMANGE 6
VALVE VALVENUMBER DESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRH TST TST STR REL PROC
CO-ORD CLS CAT SIZ TYP TYP POS RE FR TIH RE NO. REMARKS
RV-60
RV-61
RV-222
RV-223
RV-224
RV-225
SG-4 SAFETY VLV
SG-4 SAFETY VLV
SG-1 SAFETY VLV
SG-2 SAFETY VLV
SG-3 SAFETY VLV
SG-4 SAFETY VLV
32-E 2 C 10 RV N C RT T NA
31-E 2 C 10 RV N C RT T NA
31-A 2 C 10 RV N C RT T NA
31B 2 C 10 RV N C RT T NA
31-D 2 C 10 RV N C RT T NA
31-E 2 C 10 RV N C RT T NA
H-77 10908
H-77 11038
H-77 11158$
H-77 11158
H-77 11158
H-77 lll58
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMHON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 15 OF 52
U ILI RY STE SYSTEM
VALVE VALVENUMBER DESCRIPTION
P 5 lD NO. 1 80 06 H NGE 3
P 8 ID VLV VLV VLV VLV ACT NRM TST TST STR REL PROC
CO-ORO CLS CAT SIZ TYP TYP POS RE FR TIH Rf NO. 'EMARKS
NONE AUX STH SUP TQ CONT ISO IC 43-E T.S. A,C 2 CK N C LT 2A NA
NONE AUX STH SUP TO CONT ISO OC 43-D T.S, A 2 GA H LC LT 2A NA
V-670 AXS-2-208
PASSIVE
V-670 AXS-2-26
PASSIVE
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAH
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAMPAGE 16 OF 52
RE T R C L N SYSTE P IDN. 108 H NGE 3
VALVE VALVE .
NUMBER DESCRIPTIONP & ID VLV VLV VLV VLV ACT NRHCOORD CLS CAT S IZ TYP TYP POS
TSTRE
TSTFR
STRTIH
RELRE
PROC
NO. REMARKS
PCV-455C PZR PORV
PCV-456 PZR PORV
PCV-474 PZR PORV
8000A PZR PORV ISO
80008 PZR PORV ISO
8000C PZR PORV ISO
8010A
8010B
8010C
8028
PZR SAFETY VLV
PZR SAFETY VLV
PZR SAFETY VLV
RV DISC HDR TO PRT ISO IC
NONE MISC EQUIP DR TANK ISO OC 48-A T.S. A 3/4 GL H LC
40-C 1 ' 3 GL A C
40-B 1 B 3 GL A C
41-C 1 B 3 GA E 0
41-C
40-B
1 B 3 GA E 0
1 B 3 GA E 0
43-D
43-D
42-D
47-C
1 A,C
1 A,C
1 A,C
T.S. A,C
6 RV
6 RV
6 RV
4 CK
N C
N C
N C
N C
40-C 1 B 3 GL A C
LT
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
EF
PI
EF
Pl
EF
RT
RT
RT
LT
2A
2A
CS
CS
2A
NA
NA
2
NA
CS
CS
2A
2A
Q
2A
Q
T
T
T
2A
NA
2
NA
15c
NA
15c
NA
15c
NA
NA
NA
NA
CS NA
CS 2
2A NA
V-671
V-2T1
V-3J1
V-3J1
V-2T1
V-3J1
V-3J1
V-2T1
V-3J1
V-3J1
V-2T1
V-3JlV-2T1
V-3J1
V-2T1
V-3J1
H-77
H-77
H-77
V-671
RCS-2-512 D
PASSIVE
2485¹
2485¹
2485¹
PASSIVE
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUHP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 17 OF 52
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRH
CO-ORD CLS CAT SIZ TYP TYP POS
TSTREQ
TSTFR
STRTIH
RELRE
PROC
NO. REMARKS
8029 PRI MTR TO PRT ISO OC
8034A PRT TO GA ISO IC
8034B PRT TO GA ISO OC
8045 N2 TO PRT ISO OC
8046 PR I WTR TO PRT ISO IC
8047 N2 TO PRT ISO IC
48-D T.S. A 3 DI A
48-E T.S. A 3/8 GL A
48-E T.S. A 3/8 GL A
48-E T.S. A 3/4 DI A
48-D T. S. A,C 3 CK N
48-E T.S. A,C 3/4 CK N
0
0
C
0
C
C
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
FS
EF
PI
LT
2A
2A
Q
2A
2A
Q
2A
Q
Q
2A
2A
EC
LT
EC
2A
2A
2A
FS Q
EF Q
LT 2A
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
NA
k'3
83
V-2J
V-652
V-3S1
V-3S1
V-20
V-659
V-3Sl
V-3S1
V-2J
V-659
V-3S1
V-3S1
V-3S1
V-2J
V-652
V-3S1
V-3S1
V-652
V-652
V-652
V-652
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 18 OF 52
R C R L N S S N. 10 HNGE3
VALVENUMBER
VALVEDESCRIPTION
P & IDCO-ORD
VLV VLV VLV VLV ACT NRM TST TST STR REL PROC
CLS CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
8078A REACTOR VESSEL HEAD VENT
8078B REACTOR VESSEL HEAD VENT
8078C REACTOR VESSEL HEAD VENT
8078D REACTOR VESSEL HEAD VENT
75-B 2 B
75-B 2 B
75-B . 2 B
75-B 2 B 1 GL S LC PI 2A NA
FS CS NA
EF CS 10
1 GL S LC PI 2A NA
FS CS NA
EF CS 10
1 GL S LC PI 2A NA
FS CS NA
EF CS 10
1 GL S"
LC PI 2A NA
FS CS NA
EF CS 10
V-2T2
V-2T2. V-2T2
V-2T2
V-2T2
V-2T2
V-2T2
V-2T2
V-2T2
V-2T2
V-2T2
. V-2T2
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 19 OF 52
HEMI L ND V LUHE N R L P D N . 1 0 8
VALVE VALVENUMBER DESCRIPTION
FCV-110A BA SUP TO BLENDER
P 5 ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
40B-B 2 B 2 GL A
LCV-1128 VCT OUT ISO 43B-D IWV B 4 GA E
LCV-112C VCT OUT ISO 43B-D IWV B 4 GA E
8104 EMERG BORATE 418 B 2 B 2 GL E
8105 CENT CHG PP RECIRC 41B-A IWV B 2 GL E
8106 CENT CHG PP RECIRC 41B-A 2 B 2 GL E
8107 CHG LINE ISO OC
8108 CHG LINE ISO
47B-C 2
47B-C 2
B 3 GA E
B 3 GA E
8109 RCP SEAL WTR RETURN ISO IC 38-D 2 A,C 3/4 CK N
8100 RCP SEAL WTR RETURN ISO OC 39-E 2 A 4 GA E
TSTRE
Pl
FS
EF
PI
EF
PI
EF
PI
LT
EF
PI
EF
PI
EF
PI
EC
PI
EF
TSTFR
2A
Q
Q
2A
CS
2A
CS
2A
2A
CS
2A
Q
2A
CS
2A
CS
2A
CS
EF
LT
CS
2A
2A
PI 2A
STRTIH
NA
NA
10
NA
10c
NA
10c
NA
NA
10c
NA
10
NA
10c
NA
10c
NA
10c
NA
10c
NA
NA
RELRE
83
PROC
NO.
V-2K
V-3E1
V-3E1
V-2I
H-16A
V-2I
H-16A
V-21
V-645
V-3K2
V-2K
V-3E5
V-2I
V-3K9
V-2I
V-3K9
V-2I
H-16A
V-2IH-16A
V-645
V-645
REMARKS
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 197&)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 20 OF 52
HEM L ND LU C N R L S ST P DN. 1 008 CH NG
VALVE VALVENUMBER DESCRIPTION
P 8 ID VLV VLV VLV VLV ACT NRHCO-ORD . CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIH
RELRf
PROC
NO. REMARKS
8121 RCP SEAL WTR RETURN HDR RV 37-E, 2
8145 PZR AUX SPRAY CONT 43-D 1
C 2
B 2
RV
GL
8146 NORMAL CHG CONT 43-D 1 B 3 GL
8147 ALTERNATE CHG CONT 42-D 1 8 3 GL
&148 PZR AUX SPRAY BYP 43-D 1 B 2 GL
8149A LTDN ORF RO-27 ISO IC 43-C 2 A 2 GL
&112 RCP SEAL WTR RETURN ISO IC 38-E 2 A . 4 GA E 0
N C
A C
A 0
A C
A C
A C
PI
LT
EF
RT
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
FS
EF
PI
LT
FS
EF
2A
2A
CS
T
2A
CS
CS
2A
Q
Q
2A
Q
Q
2A
CS
CS
2A
2A
Q
NA
NA
10c
NA
NA
NA
10
NA
NA
10
NA
NA
10
NA
NA
10
NA
NA
NA
10c
V-2I
V-645
V-3K2
H-77
V-2S
V-3K&
V-3K8
V-2S
V-3K5
V-3K5
V-2S
V-3K5
V-3K5
V-2S
V-3K8
V-3K&
V-2Y
V-635
V-3K7
V-3K7
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMHER 197&)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM,
PAGE 21 OF 52
HEMIC L ND VOLUM N R L S ST H P 5 ID N . 1 80 8 CH NG
VALVE VALVE .
NUMBER DESCRIPTION
81498 -LTDN ORF RO-27 ISO IC
8149C LTDN ORF RO-27 ISO IC
8152 LTDN LINE ISO OC
836BA RCP-1 SEAL INJ ISO CK IC
8368B RCP-2 SEAL INJ ISO CK IC
8368C RCP-3 SEAL INJ ISO CK IC
8368D RCP-4 SEAL INJ ISO CK IC
8377 PZR AUX SPRAY CK
837&C CHG LINE CK
2 A 2 GL A C
43-C 2 A 2 GL A C
44-C 2 A 2 GL A 0
2 A,C 2 CK N 0
2 AC 2 CK N 0
2 A,C 2 CK . N 0
2 A,C 2 CK N 0
1 C 2 CK N C
2 C 3 CK N 0
31-B
33-B
37-B
42-E
43-B
P Ec ID VLV VLV VLV VLV ACT NRHCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
LT
EC
LT
EC
LT
EC
LT
EC
EC
EC
TSTFR
2A
2A
Q
Q
2A
2A
Q
Q
2A'A
CS
CS
2A
2A
2A
2A
2A
2A
2A
2A
CS
Q
STRTIH
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
RELRE
83
PROC
NO.
V-2Y
V-635
V-3K7
V-3K7
V-2Y
V-635
V-3K7
V-3K7
V-2J
V-635
,V-3K7
V-3K7
V-641
V-641
V-641
V-641
V-641
V-641
V-641
V-641
V-3K8
V-3K5
REMARKS
PGandE
DIABI 0. CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTING
VALVE PROGRAM
PAGE 22 OF 52
CHEMICAL AND VOLUME CONTROL SYSTEM P & ID NO. 1080 08 CHANGE 3
VALVE VALVENUMBER DESCRIPTION
P & ID VLV VLV VLV VLV ACT NRM TST TST STR REL PROCCO-ORD CLS CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
84788 CENT CHG PP-2 DISCH CK
8479A
8479B
8487A
8487B
CENT CHG PP-1 RECIRC CK
CENT CHG PP-2 RECIRC CK
BA TRANSFER PP-2 DISCH CK
BA TRANSFER PP-1 DISCH CK
8445 BIER BORATE REV FLO CK
8475 RECIP CHG PP-3 DISCH CK
8478A CENT CHG PP-1 DISCH CK
41B-B 2
45B-C 2
45B-B 2
C 2 CK N
C 2 CK N
C 4 CK N
45B-A 2 C 4 CK N
44B-B 2 C N
45B-A 2 C N
52B-A 2 C N
52B-.B 2 C N
C EC Q NA
0 EC Q NA
C EP Q NA
EC R NA Ã4
C EP Q NA
EC . R NA f4C EC Q NA
C EC Q NA
0 EC Q NA
0 EC Q NA
V-3E5
P-17B
P-2B
V-4A
P-2B
V-4A
P-2B
P-2B
P-14B
P-14B
PGandE DIABLO CANYON POWER PLANT-UNIT
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND [email protected] TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
INSERVICE TESTINGVALVE PROGRAM
PAGE 23 OF 52
SAFETY INJECTI N SYSTEM P 5 ID NO. 1080 09 CH NGE 2
VALVEVALVE'UMBER
DESCRIPTIONP 5 ID VLV VLV VLV VLV ACT NRM
CO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
NONE FI-927 ISOL OC 42-E 2 A 3/4 GL M LC LT 2A NA V-6518 SI-2;161
PASSIVE
8801A BIT DISCH TO RCS OC
88018 BIT DISCH TO RCS OC
8802A S I PP-1 DISCH ISO OC
43-D 1 8 4
43-C 1 8 4
54-E 2 8 4
GA E C
C
GA*
E LC
GA E
88028 SI PP-2 DISCH ISO OC
8803A BIT INLET
88038 BIT INLET
8804A CHARG PP SUCT FROM RHR
54-D 2 8 4 GA E LC
C'
C
GA E45-C 2 8 4
GA E45-B 2 8 4
48-B 2 8 8 GA E
GA E58-C 2 8 888048 SI PP SUCT FROM RHR C
C
C
E C
GA E8805A RWST TO CHARG PP SUC 48-C 2 B 8
GA E48-C 2 8 88805B RWST TO CHARG PP SUC
8807A SI PP-1 SUC TO CCP SUC XTIE 48-8 2 8 4 GA
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
2A
2A
Q
2A
CS
2A
CS
2A
Q
2A
Q
2A
R
2A
R
2A
Q
2A
Q
2A
Q
NA
10
NA
10
NA
NA
NA
NA
NA
10
NA
10
NA
15
NA
15
NA
10
NA
10
NA
10
¹6
V-2J
M-16A
V-2J
M-16A
V-2J
V-3L1
V-2J
V-3L1
V-2C
M-168
V-2C
M-168
V-78
V-78
V-78
V-7B
V-2Z
M-16A
V-2Z
M-16A
V-2H
V-3L3
0-PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER )978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 24 OF 52
VALVENUMBER
F Y N I NSSE
VALVEDES CR IPT ION
N. 0 09
P 8 ID VLV VLV VLV VLV ACT NRM
CO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
NG
TSTFR
STR
TIMRELRE
PROC
NO. REMARKS
C
E LO
E LO
E LO
E LO
E LO
E LO
C
C
C
C
C
4 GA E
8808A ACCUM-1 DISCH ISO 31-D 1 8 10 GA
8808B ACCUM-2 DISCH ISO 33-D 1 B 10 GA
8808C ACCUM-3 DISCH ISO 35-D 1 8 10 GA
37-D ) B 10 GA8808D ACCUM-4 DISCH ISO
8809A RHR TO COLO LEGS-), 2 OC 54-C 2 8 8 GA
54-8 2 888098 RHR TO COLD LEGS-3, 4 OC 8 GA
8818A RHR TO COLD LEG-1 CK 6 CK N52-C 1 A,C
8818B RHR TO COLD LEG-2 CK 51-8 1 ')C 6 CK N
8818C RHR TO COLD LEG-3 CK 5)B 1 AC 6 CK N
8818D RHR TO COLD LEG-4 CK 51-B 1 A,C 6 CK N
2 CK N52-C 1 A,C8819A SI TO COLD LEG-1 CK
88078 SI PP-1 SUC TO CCP SUC XTIE 48-8 2 8 PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
PI
EF
LT
EC
LT
EC
LT
EC
LT
EC
LT
EC
2A
2A
CS
2A
CS
2A
CS
2A
CS
2A
CS
2A
CS
R*
CS
R*
CS
R*
CS
R*
CS
R*
R
NA
10
NA
12
NA
12
NA
12
NA
12
NA
15
NA
15
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
V-2H
V-3L3
V-13
V-3L4
V-13
V-3L4
V-13
, V-3L4
V-13
V-3L4
V-2J
V-3L5
V-2J
V-3L5
V-5
V-4B
V-5
V-4B
V-5
V-4B
V-5
V-48
V-5
V-4B
*PER TECH SPEC
*PER TECH SPEC
*PER TECH SPEC
*PER TECH SPEC
*PER TECH SPEC
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 25 OF 52ET NJ I N S N. 1 9 CH NG
VALVE VALVE-NUMBER DESCRIPTION
8819B SI TO COLD LEG-2 CK
8819C SI TO COLD LEG-3 CK
8819D SI TO COLD LEG-4 CK
8820 BIT COLD INJECT CK
8821A SI PP-1 DISCH ISO
8821B SI PP-2 DISCH ISO
8835 SI COLD INJECT ISO OC
8870A BA RETURN FROM BIT
8870B BA RETURN FROM BIT
51-B 1 A,C 2 CK N C
50-B 1 A,C 2 CK N C
50-B 1 AC 2 CK N C
41-D
55-E
1 C ,3 CK N C
2 B 4 GA E 0
55-D
54-C
2 B 4 GA E 0
2 B 4 GA E LO
45-D 2 8 1 PL A 0
45-D 2 V 1 PL A 0
P 8 ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
LT
EC
LT
EC
LT
EC
EP
EF
PI
EF
PI
EF
PI
EF
PI
FS
EF
PI
FS
EF
TSTFR
R*
R
R*
R
R*
R
CS
R
2A
2A
Q
2A
CS
2A
Q
Q
2A
Q
Q
STRTIN
NA
NA
NA
NA
NA
NA
NA
NA
NA
15c
NA
15c
NA
15c
NA
NA
10c
NA
NA
10c
RELRE
87
87
87
88
88
PROC
NO.
V-5
V-4A
V-5
V-4A
V-5
V-4A
V-4B
V-4A'-2J
V-3L2
V-2J
V-3L2
V-2J
V-3L6
V-2C
M-16A
M-16A
V-2C
M-16A
M-16A
REMARKS
*PER TECH SPEC
*PER TECH SPEC
*PER TECH SPEC
rPGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 26 OF 52
S E N CINSS 5 I N. 1 009
VALVENUMBER
VALVEDESCRIPTION
P 8 ID VLV VLV VLV VLV ACT NRM
CO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIN
REIRE
PROC
NO. REMARKS
8871 SI TEST LINE ISO IC 38-C 2 A 3/4 PL A C
8880 N2 ACCUM FILL ISO OC 39-E T.S. - A 1 PL A C
8900A
8900B
8900C
8900D
8905A
8905B
8905C
89050
BIT LOOP-1 COLD INJECT CK
BIT LOOP-2 COLD INJECT CK
BIT LOOP-3 COLD INJECTCK'IT
LOOP-4 COLD INJECT CK
SI TO HOT LEG-1 CK
SI TO HOT LEG-2 CK
SI TO HOT LEG-3 CK
SI TO HOT LEG-4 CK
40-E'0-B
40-C
40-D
52-E
52-E
51-D
51-D
1 C
1 C
1 C
1 C
1 C
1 C
1 C
1 C
1.5 CK
1.5 CK
1.5 CK
1.5 CK
2 CK
2 CK
2 CK
2 CK
N C
N C
N C
N C
N C
N C
N C
N C
8883 SI PP-1 TO TEST LINE ISO OC 54-E 2 A 3/4 GL A C
PI
LT
FS
EF
PI
LT
FS
Ef
PI
LT
FS
EF
EC
EC
EC
EC
EC
EC
EC
EC
2A
2A
Q
2A
2A
Q
2A
2A
Q
Q
R
R
R
R
R
R
R
R
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
NA
NA
NA
NA
NA
PB
g8
PB
S8
0'7
47.
f747
V-20
V-651B
V-3S5
V-3S5
V-2J
V-651
V-3S5
V-3S5
V-2J
V-651B
V-3S5
V-3S5
V-4A
V-4A
V-4A
V-4A
V-4A
V-4A
V-4A
V«4A
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME.SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 27 OF 52
S FETY INJECTION SYSTEM P 5 ID NO. 1080 09 CHANGE
VALVENUMBER
VALVE.DESCRIPTION
PA IDCO-ORD
VLV VLV VLV VLV ACT NRM
CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
8911 BA SUPPLY TO BIT
8912 BA SUPPLY TO BIT CK
8916 N2 TO ACCUM SUP CK IC
8919A . SI PP-1 TO RWST CK
8919B SI PP-2 TO RWST CK
8922A S I PP-1 DISCH CK
8922B SI PP-2 DISCH CK
8923A SI PP-1 SUCT
8923B SI PP-2 SUCT
8924 RWST TO CHARG PP CK
8948A LOOP-1 COLD INJECT CK
44-C 2 B 1 PL A 0
N 0
N C
PI
FS
EF
EC
LT
EC
N C EC2 C 3/4 CK
2 C 3/4 CK
2 C 4 CK
2. C 4 CK
2 8 6 GA
57-E
N C
N C
N C
E 0.
57-D EC
EC
EC
PI
EF
PI
EF
EP
EC
LT
EP
EC
56-E
56-D
58-E
58-O 2 B 6 GA E 0
C 8 CK N C48-C 2
30-C 1 A C 10 CK N C
I
44-C . 2 C 1 CK
38-E T.S. A,C 1 CK
2A
Q
2A
2A
Q
Q
R
R
2A
Q
2A
Q
CS
R
R*
CS
R
NA
NA
10c
NA
NA
NA
NA
NA
NA
NA
NA
15c
NA
15c
NA
NA
NA
NA
NA
¹3
¹7
¹7
¹9
¹10
¹10
V-2C
M-16B
M=16B
P-14B
V-651
V-651
P-18
P-1B
V-4A
V-4A
V-2H
V-3L10
V-2H
V-3L10
V-3K10
V-4A
V-5 *PER TECH SPEC
V-4B
V-4A
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 28 OF 52
SAFETY INJECTION SYSTEM P & ID NO. 1080 09 CHANGE 2
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRMCOORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
8948C LOOP-3 COLD INJECT CK
8948D LOOP-4 COLD INJECT CK
8949A SI TO HOT LEG-1 CK
8949B SI TO HOT LEG-2 CK
8949C SI TO HOT LEG-3 CK
8949D SI TO HOT LEG-4 CK
8956A ACCUM-1 DISCH CK
8956B
8956C
:-,slI
ACCUM-2 DISCH CK
'I
ACCUM-3 DISCH CK
8956D ACCUM-4 DISCH CK
8948B LOOP-2 COLO INJECT CK 30-B 1 A,C 10 CK N . C
30-B 1 A,C 10 CK N C
30-A 1 A,C 10 CK N C
50-E 1 C
50-E 1 C
50-D 1 C
50-D 1 C
31-C 1 A,C
6 CK N C
6 CK N C
6 CK N C
6 CK N C
10 CK N C
31-B 1 A,C 10 CK N C
31-A 1 A,C 10 CK N C
31-B 1 A,C 10 CK N C-
LT
EP
EC
LT
EP
EC
LT
EP
EC
EC
EC
EC
EC
LT
EP
LT
EP
LT
EP
LT
EP
R*
CS
R
R*
CS
R
R*
CS
R
R
R
R
R
R*
R
R*
R
R*
R
R*
R
NA
NA 810
810
NA
NA
NA
NA
810
810
810
NA
NA
NA
NA
NA
NA
NA
NA
811
812
412
812
812
NA 810
NA . IllNA
V-5 *PER TECH SPEC
V-4B
V-4A
V-5 *PER TECH SPEC
V-4B
V-4A
V-5 *PER TECH SPEC
V-4B
V-4A
V-4A
V-4A
V-4A
V-4A
V-5 *PER TECH SPEC
V-4A
V-5 *PER TECH SPEC
V-4A
V-5 *PER TECH SPEC
V-4A
V-5 *PER TECH SPEC
V4-4A
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
INSERVICE TESTING
VALVE PROGRAM
PAGE 29 OF 52
SAFETY INJECTION SYSTEM P & ID NO. 1080 09 CHANGE 2
VALVENUt1BER
VALVEDESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRM
CO-ORD CLS CAT S IZ TYP TYP POS
TSTRE
TSTFR
STRTIN
RELRE
PROC
NO. REMARKS
8961 SI TEST LINE ISO OC 39-C 2 A 3l4 PL A C
8974A SI RECIRC TO RWST
8974B SI RECIRC TO RWST
57-D IWV. B 2
57-0 2 - B 2
8 88976 RWST TO SI PP ISO
8977 RWST TO S I PP CK
8980 RWST TO RHR PUMPS ISO OC
59-D 2
C 859-D 2
2 B 1259-B
2 C 12
2 B 14
8981 RWST TO RHR PP CK 59-B
8982A CONT RECIR TO RHR PP-1 ISO OC 52-A
8982B CONT RECIR TO RHR PP-2 ISO OC 53-A 2 B 14
GL E LO
LO
GA E LO
CK N C
LO
CK N C
GA E LC
LC
GL E
PI
LT
FS
EF
PI
EF
PI
EF
PI
EF
EP
EC
PI
EF
EC
PI
EF
PI
EF
2A
2A
2A
CS
2A
CS
2A
CS
R
2A
CS
R
2A
R
2A
R
NA
NA
NA
10c
NA
15c
NA
15c
NA
15c
NA
NA
NA
25c
NA
NA
30
NA
30
¹13
¹14
¹15
¹15
V-2J
V-651B
V-3S5
V-3S5
V-7B
V-3L15
V-7B
V-3L15
V-2J
V-3L13
P-1B
V-4A
V-2J
V-3L14
V-4A
V-7B
V-7B
V-7B
V-7B
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASNE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 30 OF 52
R SIDU L HE REN V L S STEM P & ID NO. 1 8
VALVE VALVE.NUMBER DESCRIPTION
P & ID VLV VLV VLV VLV ACT NRNCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
FCV-641A RHR PP-1 RECIRC VLV
FCV-641B RHR PP-2 RECIRC VLV
HCV-637 RHR HX-2 OUTLET
HCV-638 RHR HX-1 OUTLET
8700A RHR PP-1 SUCT OC
8700B RHR PP-2 SUCT OC
8701 RCS LOOP-4 TO RHR IC
8702 RCS LOOP-4 TO RHR
8703 RHR TO HOT LEGS-1, 2 IC
8716A RHR TRAIN CROSSTIE OC
34-E 2 B 2 GL E
34-B 2 B 2 GL E
31-B
31-0
37-B 2 B 14 GA E
37-B 2 B 14 GA E
38-0 1 A 14 GA E
39-D 1 A 14 GA E
38-B 2 B 12 GA E
30-0 2 B 8 GA E
2 B 8 BV A
2 8 8 BV A
0
LC
LC
LC
0
PI
EF
Pl
EF
EF
FS
EF
FS
PI
EF
Pl
EF
PI
LT
EF
Pl
LT
EF
PI
EF
Pl
EF
2A
Q
2A
2A.
2A
Q
2A
R*
CS
2A
R*
CS
2A
CS
2A
Q
NA
15c
NA
15c
NA 816
. NA
NA 016
NA
NA
170c
NA
170c
NA
NA
160c
NA
NA
160c
NA
85
NA
15c
V-2D
V-3Nl
V-20
V-3M1
V-3M2
V-3M2
V-3M2
V-3M2
V-7B
V-3M4
V-7B
V-3M4
V-7A
V-7C *PER TECH SPEC
V-3M5
V-7A
V-7C *PER TECH SPEC
V-3M5
V-2M
V-3M6
V-2J
V-3N7
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 31 OF 52R S IDU L HE REM V L S STEM P5 DN. 1 H N
VALVE VALVE'UMBERDESCRIPTION
P & ID VLV VLV - VLV VLV ACT NRM TST TST STR REL PROCCO-ORD CLS CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
8716B RHR TRAIN CROSSTIE OC
8730A RHR PP-1 DISCH CK
8730B RHR PP-2 DISCH CK
8740A RHR TO HOT LEG-1 CK
8740B RHR TO HOT LEG-2 CK
30-C 2 B 8 GA E 0
35-D 2 C 8 CK N C
39-B 1
39-A 1
C 8 CK N C
C 8 CK N C
35-B 2 C 8 CK N C
PI
EF
EP
EC
EP
EC
EC
EC
2A
Q
Q
CS
Q
CS
R
R
NA
15c
NA
NA
NA
NA
NA
NA
V-2J
V-3M7
P-3B
V-4B
P-3B
V-4B
817 V-4A
817 V-4A
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 32 OF 52
NUCLE R STE UPPL KIPLING SYSTEM PA IDN. 1 1 CHNGE
'VALVE VALVENUMBER DESCRIPTION
9354A PZR STM SAMPLE ISO IC
P 5 ID VLV VLV VLV VLV ACT NRM
CO-ORD CLS CAT SIZ TYP TYP POS
21-A 2 A 3/8 PL A
TSTRE
PI
LT
FS
EF
TSTFR
STR RELTIM RE
2A NA
2A NA
NA
10c
PROC
NO. REMARKS
V-20
V-659
V-3S1
V-3S1
9354B PZR STM SAMPLE ISO OC
9355A PZR LIQUID SAMPLE ISO IC
93558 PZR LIQUID SAMPLE ISO OC
9356A HOT LEG SAMPLE ISO IC
22-A 2 A 3/8 PL A
21-B 2 A 3/8 PL A
22-8' A 3/8 PL A
21-B 2 A 3/8 PL A
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
2A
2A
Q
Q
2A
2A
Q
2A
2A
Q
Q
2A
2A
Q
Q
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
V-2J
V-659
V-3S1
V-3S1
V-20
V-659
V-3S1
V-3S1
V-2J
V-659
V-3S1
V-3S1 .
V-20
V-659
V-3S1
V-3S1
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP. AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
INSERVICE TESTING
VALVE PROGRAM
PAGE 33 OF 52
NUCLEAR STEAM SUPPLY SAMPLING SYSTEM P & ID NO. 1080 11 CHANGE 2
VALVENUMBER
VALVEDESCRIPTION
P 8 ID VLV VLV VLV VLV ACT NRH TST TST STR REL PROCCO-ORD 'LS CAT 'IZ TYP TYP POS RE FR TIH RE NO. — REMARKS
9356B HOT LEG SAHPLE ISO OC
9357A ACCUH SAMPLE ISO IC
9357B ACCUH SAHPLE ISO OC
22-B
22-C
2 A 3/8 PL A'
PI
LT
FS
EF
T.S. A 3/8 PL A 0 PI
LT
FS
EF
T.S. A '/8 PL A 0 PI
LT
FS
EF
2A NA
2A NA
Q NA
Q 10c
2A NA
2A NA
Q NA
Q 10c
2A NA
2A NA
Q NA
Q 10c
V-2J
V-659
V-3S1
V-3S1
V-20
V-659
V-3S1
V-3S1
V-2J
V-659
V-3S1
V-3S1
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTING.VALVE PROGRAMPAGE 34 OF 52
N N P
VALVE VALVENUMBER DESCRIPTION
N.1 1
P 5 ID VLV VLV'LV VLV ACT NRM
COORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
NONE CS ADD TK VAC BREAK
NONE CS ADD TK VAC BREAK
NONE CS PP-1'O MEDT ISO OC
37-0 2 C 1.75 RV N C
37-C 2 C 1.75 RV N C
33-D 2 A .75 GL M LC
RT
RT
LT
NONE CS PP-2 TO MEDT ISO OC 33-B 2 A .75 GL M LC LT
8994B NAOH CONT SPRAY EDUCTOR ISO 37-8 2 B 3
8998A SPRAY ADD TANK OUT CK
89988 SPRAY ADD TANK OUT CK
9001A CONT SPRAY PP-1 ISO
35-C 2 C 3
35-B 2 C 3
34D 2 A 8
9001B CONT SPRAY PP-2 ISO 34-A 2 A 8
9002A CS PP-1 DISCH CK
9002B CS PP-2 DISCH CK
9003A RHR HX-1 TO CS-A HDR
33-D 2 C 8
33-A 2 C 8
33-D 2 B 8
GA E
GA E
LO PI
C
C
C
C
C
C
C
PI
Ef
PI
EF
EC
EC
Pl
LT
EF
PI
LT
EF
EC
EC
PI
EF
GA E C
CK N
CK N
GA E
GA E C
CK N
CK N
GA E
8992 SPRAY ADD TANK STOP 37B 2 B 3
8994A NAOH CONT SPRAY EDUCTOR ISO 36-B 2 B 3
T
T
2A
2A
2A
2A
CS
2A
CS
CS
CS
2A
2A
Q
2A
2A
R
R
2A
R
NA
NA
NA
NA
NA
10
NA
10
NA
NA
NA
NA
10
NA
NA
10
NA
NA
NA
15
818
818
85
M-77
M-77
V-630
V-630
V-2G2
V-2G2
V-2G1
V-2G2
V-2G1
V-311
V-311
V-2B
V-630
M-16H
V-2B
V-630
M-16H
V-17
V-17
V-7B
V-7B
CS-2-1
CS-2-2
CS-2-310
PASSIVE
CS-2-32D
PASSIVE
PASSIVE
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 35 OF 52
CONTAINNEN SPR Y S STEM = PL ION. 108 1 H GE1
VALVE VALVENUMBER DESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRM TST TST STR REL PROC
CO-ORD CLS CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
9003B RHR HX-2 TO CS-B HDR
9011A CS HDR-A ISO CK IC
9011B CS HDR-B ISO CK IC
33-B 2 B 8 GA E C
310 2 AC 8 CK O'
31A 2 AC 8 CK N C
PI 2A NA V7B
EF R '.15 P5 V-78
LT 2A NA V-630
EM 5A NA 819 V-18
LT 2A NA V-630
EM 5A NA 819 V-18
PGandE DIABLO CANYON POWER PLANT-Ul'lIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
INSERVICE TESTINGVALVE PROGRAM
PAGE 36 OF 52COMPONENT CO LING MATER SYSTEM P & IO NO. 1080 14 CHANGE 4
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRMCOORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STR RELTIM RE
PROC
NO. REMARKS
NONE CCW 2-FCV-749 BYPASS CK IC 71-B 3 A,C 3/4 CK N C LT 2A NA V-619 CCW-2-581
PASSIVE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
CCM PP-1 HDR-A CK
CCW PP-2 HDR-A CK
CCW PP-3 HDR-A CK
CCW PP-1 HDR-B CK
CCW PP-2 HOR-B CK
CCW PP-3 HDR-B CK
CCW FCV-750 BYPASS CK IC
51-E
53-E
55-E
51-D
53-0
55-D
73-B
3 C
3 C
3 C
3 C
3 C
3 C
3 A,C
20 CK
20 CK
20 CK
20 CK
20 CK
20 CK
3/4 CK
NONE CCM TO XCES LTDN HX CK OC 98-D 3 A,C 4 CK
FCV-355 CCM HOR-C ISO 59-D 3 B 20 BV
FCV-356 CCW TO RCP & VES SUP ISO OC 72-E 3 A 10 BV
FCV-357 RCP'S THM BAR CCW RETN ISO OC 73-B 3 A 6 GL
FCV-360 CFCU-1, 2, 5 CCM MAX FLO VLV 66-B 3 B 18 BV
NONE CCW TO RCP & VSC SUP CK IC 72-E 3 A,C 10 CK N 0
N 0
N 0
N 0
N 0
N 0
N 0
N C
N 0
E 0
E 0
E 0
A C
LT
EC
EC
EC
EC
EC
EC
EC
LT
LT
EC
PI
EF
PI
LT
EF
PI
LT
EF
PI
EF
2A
2A
Q
Q
Q
Q
Q
2A
2A
2A
2A
CS
2A
2A
CS
2A
2A
CS
2A
Q
NA
NA ¹3NA
NA
NA
NA
NA
NA
NA
NA
NA ¹3NA
15c
NA
NA
15c
NA
NA
25c
NA
10
V-619 CCW-2-670
PASSIVE
V-623 CCW-2-695
V-623
V-2F
V-3H3
V-2J
V-619
V-3H4
V-2J
V-619
V-3H5
V-2H
M-16R
V-619 CCW-2-585
V-619
P-8B CCW-2-601
P-8B CCW-2-602
P-8B CCM-2-603
P-8B CCW-2-607
P-8B CCW-2-608
P-8B CCW-2-609
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 37 OF 52CMPNN LN N. 1
VALVE VALVENUMBER DESCR IPTION
P 8 ID. VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
FCV-363 RCP'S CLR CCW RETURN ISO OC 72-B 3 A 6 BV E 0
FCV-364 RHR HX-2 CCW RETURN VLV 60-C 3 B 12 BV A C
FCV-365 RHR HX-1 CCW RETURN VLV 104-C 3 8 12 BV A C
FCV-366 CFCU-3,4 CCW MAX FLO:VLV 107B 3 B 16 BV A C
FCV-430 CCW HX-1 OUT ISOL 58-E 3 B 30 BV E 0
FCV-431 CCW HX-2 OUT ISOL 58-D 3 B 30 BV E 0
FCV-361 CCW FROM XCES LTDN HX ISO OC 98-B 3 A 4 BV A C PI
LT
FS
EF
PI
LT
EF
PI
FS
EF
Pl
FS
Ef
PI
FS
EF
PI
EF
PI
EF
2A
2A
Q
Q
2A
2A
CS
2A
Q
Q
2A
Q
Q
2A
Q
2A
Q
2A
Q
NA
NA
NA
10c
NA
NA
20c
NA
NA
10
NA
NA
10
NA
NA
10
NA
45
NA
45
V-2J
V-623
V-3S1
V-3S1
V-2J
V-619
V-3H6
V-2H
V-3H7
V-3H7
V-2H
V-3H7
V-3H7
V«2H
M-16B
M-168
V-2F
V-3HB
V-2F
V-3H8
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMHON PUMP AND VALVE TESTING PROGRN
.ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 197&)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 38 OF 52
CNPNN C LING ATRS P D N . 1 80 14 NG
VALVENUHBER
VALVEDESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRH TST TST STR REL PROC
CO-ORD CLS CAT SIZ TYP TYP POS RE FR TIN RE NO. REMARKS
FCV-750 RCPS THH BAR CCW RETRN ISO IC 73-B 3 A 6 GL E
LCV-69 HU WTR TO CCW HDR-A 55-B 3 B 3 GL A
LCV-70 MU MTR TO CCW HDR-B 55-B 3 B '= GL A
FCV-749 RCP'S CLR CCW RETURN ISO IC 72-B 3 A 6 BV E 0 PI 2A NA
LT 2A NA
EF CS 10c
0 PI 2A NA
LT 2A NA
EF CS 10c
C EF Q 10
FS Q NA
C EF Q 10
FS Q NA
V-20
V-619
V.-3H10
V-20
V-619
V-3H9
V-3Hll'-3H11
V-3H11
V-3H11
RCV-16 CCM SURGE TANK VENT 56-C 3 B 3 BA E 0 PI 2A NA
EF Q 10c
V-2F
V-3H12
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERV ICE TESTINGVALVE PROGRAM
PAGE 39 OF 52
VALVE VALVENUMBER DESCRIPTION
PA IDCO-ORD
VLV VLV VLV VLV ACT NRM TST TST STR REL PROC
CLS CAT SIZ TYP TYP POS RE FR TIN RE NO. REMARKS
NONE
NONE
NONE
NONE
NONE
AFW PP RECIRC TO CST CK
CST TO MU H20 XFP PP'S CK
MU H20 XFR PP-01 DISCH CK
MU H20 XFR PP-02 DISCH CK
MU H20 TO CCW SURGE TANK CK
78-C 3
78-E 3
74-D 3
75-D 3
78-E 3
2 CK N
4 CK N
4 CK N
4 CK N
4 CK N
EC Q NA
EC Q NA
EC Q NA
EC Q NA
EC Q NA
P-5B
P-15B
P-15B
P-15B
V-3H11
MU-2»963
MU-2-965
MU-2-968
MU-2-970
MU-2-971
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRN4
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUtOER 1978)
DIABLO CANYON POMER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 40 OF 52
SLM RSS P& N. 8 1
VALVE VALVE.NUMBER DESCRIPTION
P & ID VLV VLV VLV VLV ACT NRH TST TST STR REL PROCCO-ORD CLS CAT SIZ TYP TYP POS RE FR TIN RE NO. REMARKS
NONE ASW PP-1 DISCH CK
NONE ASM PP-2 DISCH CK
FCV-495 ASW PP-2 CROSS TIE
FCV-496 ASW PP-1 CROSS TIE
FCV-601 ASW UNIT CROSS TIE
FCV-602 CCM HX-1 SM INLET
FCV-603 CCW HX-2 SM INLET
34-C 3
34-C 3
35-C 3
35-C — 3
34-C 3
36-C 3
36-B 3
C 24 CK N
C 24 CK N
B 24 BV E
B 24 BV E
B 24 BV E
B 24 BV A
B 24 BV A
0 EC Q NA
0 EC Q NA
0 PI 2A NA
Ef Q 15
0 PI 2A NA
EF Q 15
C PI 2A NA
EF Q 15
0 PI 2A NA
FS Q NA
EF Q 60
0 PI 2A NA
FS Q NA
EF Q 60
P-7B
P-7B
V-2A
V-3F1
V-2A
V-3F2
V-2A
V-3F3
V-2F
V-3F4
V-3F4
V-2F
V-3F5
V-3F5
SM-2-200
SW-2-201
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COHHON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 41 Of 52
VALVENUMBER
FIRE PROTECTI N SYSTEM
VALVEDESCRIPTION
P 5 ID NO. 108 18 CHANGE 3
P 8 ID VLV VLV VLV VLV ACT NRH TST TST STR REL PROCCO-ORD CLS CAT SIZ TYP TYP POS RE FR TIH RE NO. REMARKS
NONE CONT FIREWATER ISO CK IC 73-0 T.S. A,C 4 CK N C LT 2A NA V-679 FP-2-180
PASSIVEFCV-633 CONT FIREWATER ISO OC 72-E T.S. A 4 PL A 0 PI 2A NA
LT 2A NA
FS g NA
EF g 10c
V-2J
V-679
V-3S4
V-3S4
PGandE DIABLO CANYON POWER PLANT-UNIT 2DIABLO CANYON PO'WER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
INSERVICE TESTINGVALVE PROGRAM
PAGE 42 OF 52
LIQUID R DW ST S S EM P & ID N . 1 19 H NGE
VALVE VALVENUMBER DESCRIPTION
NONE N2 TO RCDT CK IC
FCV-253 RCDT PP DISCH ISO IC
FCV-254 RCDT PP DISCH ISO OC
FCV-255 RCDT VENT ISO IC
FCV-256 RCDT VENT ISO OC
P & ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
38-C T.S. A,C 3/4 CK N
38-A T.S. A 2.5 BA A
39-A T.S. A 2.5 BA A
38-B T.S. A 3/4 BA A
39-B T.S. A 3/4 BA A
TSTRE
LT
EC
PI
LT
FS
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
TSTFR
2A
2A
2A
2A
Q.
Q
2A
2A
Q
Q
2A
2A
Q
2A
2A
Q
STRTIM
NA
NA
NA
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
RELRE
PROC
NO. REMARKS
V-652 LWS-2-60
V-652
V-20
V-650
V-3S3
V-3S3
V-3S3
V-2J
V-650
V-3S3
V-3S3
V-20
V-651
V-3S3
V-3S3
V-2J
V-651
V-3S3
V-3S3
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 43 OF 52LIQUID R 0 S S
VALVE VALVENUHBER DESCRIPTION
FCV-257 RCDT GAS ANAL ISO OC
FCV-258 RCDT GAS ANAL ISO IC
FCV-260 N2 TO RCDT ISO OC
FCV-500 CONT SUMP 0 ISCH ISO IC
FCV-501 CONT SUMP DISCH ISO OC
19
TST. TSTRE FR
39-B T.S. A 1/2 BA A
38-B T.S. A 1/2 BA .A
38-C T.S. A 3/4 BA A
38-'D T.S. A 2 BA A
39-0 T.S. A 2 BA A
PI
LT
FS
EF
PI
LT
FS
EF
0 PI
LT
FS
EF
Pl
LT
FS
EF
PI
LT
FS
EF
2A
2A
Q
Q
2A
2A
Q
2A
2A
Q
Q
2A
2A
Q
Q
2A
2A
Q
Q
P 8 ID VLV VLV VLV VLV ACT NRHCO-ORD CLS CAT SIZ TYP TYP POS
STRTIH
NA
NA
NA
10C
NA
NA
NA
10C
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
RELRE
PROC
NO.
V-2J
V-651
V-3S3
V-3S3
V-20
V-651
V-3S3
V-3S3
V-2J
V-652
V-3S3
V-3S3
V-20
V-649
V-3S3
V-3S3
V-2J
V-649
V-3S3
V-3S3
REMARKS
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND C0$ 10N PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTING
VALVE PROGRAM
PAGE 44 OF 52
LIQUID RADWASTE SYSTEM P & ID NO. 1080 19 CHANGE 3
VALVE VALVENUMBER DESCRIPTION
P & ID. VLV VLV VLV VLV ACT NRM TST TST STR REL PROCCO-ORD CLS CAT SIZ . TYP TYP POS RE FR TIM RE NO. REMARKS
FC -69 RX C V SUMP SAMP SUPPL IS C 3 -B .S. A 8 GL
8767
8787
8795
8796
REFUEL MTR PURIF OC
REFUEL WTR PURIF OC
REFUEL MTR PURIF IC
REFUEL WTR PURIF IC
39-C
38-D
T.S. A
T.S. A
38-C T.S. A
38-D T.S. A
4 Dl
4 DI
4 DI
4 DI
FCV-697 RX CAV SUMP SAMP SUPPLY ISO OC 39-B T.S. A 3/8 GL
S C PI
LT
EF
S. C PI
LT
EF
M LC LT
M LC LT
M LC LT
M LC LT
N V-682
2A NA V-682
CS 10 V-3T5
2A NA V-682
2A NA V-682
CS 10 V-3T5
2A NA V-646 PASSIVE
2A NA V-646 PASSIVE
2A NA V-646 PASSIVE
2A NA V-646 PASSIVE
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COHHON PUMP AND VALVE TESTING PROGRAH
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUHHER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAHPAGE 45 OF 52
DIESEL G NER T R SYS EH P5 IDN. 108 1 H NGE
VALVE VALVE "NUHBER DESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRH TST TSTCO-ORD CLS CAT SIZ TYP TYP POS RE FR
STRTIH
REL PROC
RE NO. REHARKS
NONE DSL FO XFR PP-01 DISCH CK
NONE DSL FO XFR PP-02 DISCH CK
NONE DSL FO TANK-01 SUC CK
NONE DSL FO TANK-02 SUC CK
LCV-85 DSL FO DAY TANK-2-2 SUP
LCV-86 DSL FO DAY TANK-2-1 SUP
LCV-87 DSL FO DAY TANK-1-3 SUP
LCV-88 DSL FO DAY TANK-2-2 SUP
LCV-89 DSL FO DAY TANK-2-1 SUP
LCV-90 DSL FO DAY TANK-1-3 SUP
24-D
24-B
21-D
21-B
28-A
28-B
27-C
27-A
27-B
28-C
N C EC Q
N C EC Q
N C EC Q
N C EC Q
A C EF CS
FS CS
A C EF CS
FS CS
C EF CS
FS CS
C ~ EF CS
FS CS
C EF CS
FS CS
C EF CS
FS CS
3 C 2 CK
3 C 2 CK
3 C 3 CK
3 C 3 CK
3 B 15 BA
3 B 15 BA
3 B 15 BA A
3 8 15 BA A
3 B 15 BA A
3 B 15 BA A
NA
NA
NA
NA
10
NA
10
NA
10
NA
10
NA
10
NA
10
NA
H-9A
H-9A
H-9A
H-9A
V-303
V-303
V-303
V-303
V-303
V-303
V-303
V-303
V-303
V-303
V-303
V-303
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 46 OF 52
V N L I N ND IR ND Tl N NG SYS EM N.10 3 CH NG 3
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRM TSTCO-ORD CLS CAT SIZ TYP TYP POS RE
TSTFR
STRTIM
RELRE
PROC
NO. — REMARKS
NONE CHP SUP FAN-1 ISO OC 45A-0 T.S. A 4 GA M LC LT
NONE. CHP SUP FAN-2 ISO OC 45A-E T.S. A 4 GA M LC LT
NONE CHP SUP ISO IC 4BA-D T.S. A,C 4 CK N C LT
NONE CHP SUP ISO IC 48A-C T.S. A,C 4 CK N C LT
NONE CONT AIR SAMP RETURN ISO IC ill-C T.S. A,C 2 CK N 0 LT
EC
NONE CONT AIR SAMP POST LOCA RTRN ISO IClll-D T.S. A,C 3/8 CK N C LT
EC
NONE CONT H2 SAMP RETURN CK IC 131-'B T.S. A,C 3/8 CK N C LT
EC
EC
NONE CONT H2 SAMP RETURN CK IC 131-0 T.S. A,C 3/8 CK N C LT
EC
EC
'31-A T.S. A 3/8 GL S LC PI
LT
FS
EF
2A
2A
2A
2A
2A
2A
2A
2A
2A
CS
2A
2A
CS
2A
2A
CS
CS
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
10
83
V-683
V-683
V-683
V-668
V-668
V-682
V-682
V-678
V-678
V-3T3
V-678
V-678
V-3T3
V-2X
V-678
V-3T3
V-3T3
VAC-2-1
PASSIVE
VAC-2-2
PASSIVE
VAC-2-200
PASSIVE
VAC-2-201
PASSIVE
VAC-2-21
VAC-2-116
VAC-2-252
EC CLOSE
EC OPEN
VAC-2-253
EC CLOSE
EC OPEN
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 47 OF 52VEN L I N N R ND N S N.10
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
FCV-236 CONT H2 SAMP SUP ISO IC 133-A T.S. A 3/8 GL
FCV-238 CONT H2 SAMP SUP ISO OC 131-C T.S. A 3/8 GL
FCV-239 CONT H2 SAMP SUP ISO OC 133-'C T.S. A 3/8 GL
FCV-240 CONT H2 SAMP SUP ISO OC 133-D T.S. A 3/8 — GL
FCV-237 CONT H2 SAMP RETURN ISO OC 133-B T.S. A 3/8 GL
S LC
S LC
S LC
S LC
PI
LT
FS
EF
Pl
LT
FS
EF
PI
LT
FS
EF
PI
LT~ FS
EF
S LC PI
LT
FS
Ef
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
NA
NA
NA
10
NA
NA
NA
10
NA
NA
NA
10
NA
NA
10
NA
NA
NA
10
V-2X
V-678
V-3T3
V-3T3
V-2X
V-678
V-3T3-
V-3T3
V-2X
V-678
V-3T3
V-3T3
V-2X
V-678
V-3T3
V-3T3
V-2X
V-678
V-3T3
V-3T3
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 48 OF 52
VEN IL Tl N ND AIR C NDITI N NG SYSTEM P 5 ID NO. 1080 3 CH NGE
VALVENUMBER
VALVEDESCRIPTION
P 5 ID VLV VLV VLV VLV ACT NRM
CO-ORD CLS CAT SIZ TYP TYP POS
TSTRE
TSTFR
STR RELTIM RE
PROC
NO. REMARKS
FCV-655 INCORE CHILL WTR SUP ISO OC 30-B T.S. A 2 BA
FCV-656 INCORE CHILL WTR SUP ISO OC 30-8 T.S. A 2 BA
FCV-657 INCORE CHILL WTR SUP ISO OC 30-'B T.S. A 2 BA
FCV-658 CONT EXT H2 RCMB ISO IC 48A-C T.S. A 4 GA
FCV-659 CONT EXT H2 RCMB ISO IC 48A-B T.S. A 4 GA
FCV-654 INCORE CHILL WTR SUP ISO OC 30-B T.S. A 2 BA A 0
A 0
A 0
A 0
E LC
E LC
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
EF
PI
LT
EF
2A
2A
Q
2A
2A
Q
Q
2A
2A
Q
2A
2A
Q
Q
2A
2A
CS
2A
2A
CS
NA'A
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
15
NA
NA
15
V-2J
V-682
V-3S4
V-3S4
V-20
V-682
V-3S4
V-3S4
V-2J
V-682
V-3S4
V-3S4
V-20
V-682
V-3S4
V-3S4
V-2X
V-65?
V-3T3
V-2X
V-657
V-3T3
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 49 OF 52VEN L TI N ND R ND I N NG S S EM 5 ID N . 108 H NG
VALVENUMBER
VALVEDESCRIPTION
P 8I ID VLV VLV VLV VLV ACT NRMCO-ORD CLS CAT SIZ =TYP TYP POS
TSTRE
TSTFR
STRTIM
RELRE
PROC
NO. REMARKS
FCV-660 CONT PURGE SUP ISO IC 34-C '.S. A 48 BV A C
FCV-661 CONT PURGE SUP ISO OC 34-C T.S. A 48 BV A
FCV-662 CONT EXCESS PRES/VAC RLV ISO IC 34-C T.S. A — 12 BV A C
FCV-664 CONT VAC RELIEF OC 34-C T.S. A 12 BV A C
FCV-668 CONT EXT H2 RCMB ISO OC 47A-C T.S. A 4 GA E LC
FCV-663 CONT EXCESS PRES RLV ISO IC 34-'C T.S. A 12 BV A C
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
EF
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
NA
NA
NA
2C
NA
NA
NA
2c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
NA
10c
NA
NA
15 .
k'20
820
820
820
820
V-2Q
V-661
V-3T6
V-3T6
V-2E
V-661
V-3T6
V-3T6
V-2Q
V-663
V-3T6
V-3T6
V-2Q
V-663
V-3T6
V-3T6
V-2Q
V-663
V-3T6
V-3T6
V-2X
V-657
V-3T3
r
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 50 OF 52
N I I N ND R NDI I NI G S S DN.10 NG
VALVE VALVENUMBER DESCRIPTION
FCV-669 CONT EXT H2 RCMB ISO OC
P 5 ID VLV VLV VLV VLV ACT NRM
CO-ORD - CLS CAT SIZ TYP TYP POS
47A-B T.S. A 4 GA E LC
0
0
0
C
C
A 1 BA A
FCV-679 CONT AIR SAMPLE SUP ISO OC 113-B T.S. A 1 BA A
A 1 BA AFCV-681 CONT AIR SAMPLE RETURN ISO OC 113-C T.S.
FCV-698CONT AIR SAMP POST LOCA SUP ISO IC 111-C T.S. A 3/8 GL S
A 3/8 GL SFCV-699CONT AIR SAMP POST LOCA SUP ISO IC 113-C T.S.
FCV-678 CONT AIR SAMPLE SUP ISO IC ill-B T.S.
TSTRE
PI
LT
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
PI
LT
FS
EF
TSTFR
2A
2A
CS
2A
2A
Q
Q
2A
2A
Q
Q
2A
2A
Q
Q
2A
2A
CS
CS
2A
2A
CS
CS
STRTIM
NA
NA
15
NA
NA
NA
10c
NA
'ANA
10c
NA
NA
NA
10c
NA
NA
NA
10
NA
NA
NA
10
RELRE
PROC
NO.
V-2X
V-657
V-3T3
V-20
V-668
V-3T1
V-3T1
V-2J
V-668
V-3T1
V-3T1
V-2J
V-668
V-3Tl
V-3T1
V-682
V-682
V-3T4
V-3T4
V-6&2
V-682
V-3T4
V-3T4
REMARKS
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VAI VE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTING
VALVE PROGRAM
PAGE 51 OF 52
VENTILATION AND AIR CONDITIONING SYSTEM P 5 ID NO. 1080 23 CHANGE 3
VALVENUMBER
VALVEDESCRIPTION
P & ID VLV VLV VLV VLV ACT NRM TST TST STR REL PROC
CO-ORD CLS CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
RCV-11 CONT PURGE EXHAUST ISO IC 34-C T.S.
RCV-12 CONT PURGE EXHAUST ISO IC 34-C T.S.
FCV-700CONT AIR SAMP POST LOCA SUP ISO IC 113-D T.S. A 3/8 GL S C P ILT
FS
EF
A 48 BV A C PI
LT
FS
EF
A. 48 BV A C PI
LT
FS
EF
2A
2A
CS
CS
2A
2A
CS
CS
2A
2A
CS
CS
NA V-682
NA V-682
NA V-3T4
10 V-3T4
NA V-2E
NA V-662
NA V-3T6
2c 820 V-3T6
NA V-2E
NA V-662
NA V-3T6
2c 420 V-3T6
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASHE SECTION XI 1977 EDITION (ADDENDA THROUGH SUHHER 1978)
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE 52 OF 52
COMPRESSED AIR SYSTEMS P EE ID N . 1020 25 CH NGE 8
VALVE VALVENUMBER DESCRIPTION
P 8I ID VLV . VLV VLV VLV ACT NRH TST TST STR REL PROC
CO-ORD CLS CAT SIZ TYP TYP POS RE FR TIM RE NO. REMARKS
NONE CONT SERVICE AIR SUP ISO IC 48-D
NONE CONT SERV AIR SUP ISO OC 47-D
NONE CONT NORM INST AIR SUP ISO BP OC 47-C
NONE CONT NORM'NST AIR SUP ISO IC 47-D
.T.S. A,C
T.S. A
T.S. A
T.S. A,C
FCV-584 CONT NORM INST AIR SUP ISO OC 47-C T.S. A
3 CK N C LT
3 BA M LC LT
1;5 Dl M LC LT
2 CK N 0 LT
EC
2 GL'
0 PI
LT
FS
EF
2A NA
2A NA
2A NA
2A NA
2ANA'A
NA
2A NA
Q NA
Q 10c
V-656
V-656
V-654
V-654
03 V-654
V-2J
V-654
V-3S4
V-3S4
AIR-S-2-115
AIR-S-2-200
AIR-I-2-585AIR-I-2-238
PGandE
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
DIABLO CANYON POWER PLANT-UNIT 2
INSERVICE TESTINGVALVE PROGRAM
PAGE I OF 18
Rev-0 (Oct. 1984)
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
FW-2-349 AUX FP-I SUCT CK RWS
FW-2-353 AUX FP-253 SUCT CK RWS
These check valves supply anadditional source of water to thesteam generator via the auxfeedwater pumps.
3 C IWV-3520
3 C
.TST REQ-ECTST FRQ-Q
These valves cannot be exercised with flow becausethe water from the Raw Water Storage Reservoirwould contaminate the steam generators creatingchemistry problems which could effect theintegrity of the steam generator tubes.
These valves will be disassembled and internallyinspected (mechanical exercise) to verifyOPERABILITY. This inspection will be performedat a frequency of at least once per 5 years.
MS-2-1068 SG-I MS LINE CHECK VALVEMS-2-2066 SG-2 MS LINE CHECK VALVE
MS-2-3062 SG-3 MS LINE CHECK VALVE
MS-2-4062 SG-4 MS LINE CHECK VALVE
These check valves perform anaccident-related function in thatthey are required to close in theevent of a steam line breakupstream of the MSIVs in order toprevent blowing down of more thanone steam generator.
IWV C IWV-3520IWV C
IWV C TST REQ-EC
IWV C TST FRQ-Q
These valves cannot be exercised closed becauseprovisions are not provided in the plant designto verify .that these valves close on reverse flow.
These valves will be disassembled and/or internallyinspected to verify OPERABILITY. This inspectionwill be performed at a frequency of at least onceper 5 years.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VAl VE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERV ICE TESTINGVALVE PROGRAM
PAGE 2 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF ANDCLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
3 AIR-I-587 CONT NORM INST AIRSUP ISO OC
CCW-2-585 CCW TO RCP 8 VSL SUP CK IC
CCW-2-695 CCW TO XCESSS LTDN HX CK OC
LWS-2-60 N2 TO RCDT IC
VAC-2-21 CONT AIR SAMP RETURN ISO IC
VAC-2-116 CONT AIR SAMP POST LOCA RTRN
ISO IC
VAC-2-252 CONT H2 SAMP RETURN CK IC
VAC-2-253 CONT H2 SAMP RETURN CK IC
8046 PRI WTR TO PRT ISO IC
8047 N2 TO PRT ISO IC
8109 RCP SEAL WTR RETURN ISO IC
8368A RCP-1 SEAL INJ ISO CK IC
8368B RCP-2 SEAL INJ ISO CK IC
8368C RCP-3 SEAL INJ ISO CK IC
83680 RCP-4 SEAL INJ ISO CK IC
8916 N2 TO ACCUM SUP CK IC
T.S. A,C IWV-3520
3 A,C TST REQ-EC
3 A,C TST FRQ-Q
T.S. A,C
T.S. A,C
T.S. A,C
T.S. A,C
T.S. A,C
T.S. A,C
T.S. A,C
2 A,C
2 A,C
2 A,C
2 A,C
2 A,C
T.S. A,C
These check valves can only be verified closed
by leak-rate testing. They will be leak-ratetested at a two year interval.
These check valves function toprevent reverse flow fromcontainment to the systemoutside of containment.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 3 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
4 8478A CENT CHG PP-I DISCH CK
8478B CENT CHG PP-2 DISCH CK
These check valves function tosupply flow from the centrifugalcharging pumps to the BIT on a
Safety Injection.
2 C IWV-3521IWV-3522
2 C TST REQ-ECTST FRQ-Q
These valves cannot be full-stroke exercised duringpower operation because of insufficient availableflow. These valves will be partial-strokeexercised during power operation.
These valves cannot be full-stroke exercisedduring cold shutdown because this could result ina possible low temperature overpressurization ofthe RCS.
These valves will be full-stroke exercised on theway to or during refueling outages.
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
5 8803A BIT INLET
8803B BIT INLET
These gate valves isolate theBIT from the charging pumpsduring normal operation. Thesevalves open on a safetyinjection signal.
2 B IWV-3411
2 B TST REQ-EFTST FRQ-Q
These valves cannot be exercised during poweroperation when the positive displacement chargingpump is inoperable. Because with the centrifugalpumps running to provide normal charging flow,opening either one of these valves may dilutethe BIT concentration and/or subject the BIT to anunnecessary pressurization cycle. There is aspecified number of design pressurization cyclesfor the BIT, and a low. limit for operability forboron concentration.
These valves will be full-stroke exercised in allmodes when the positive displacement pump is OPERABLE.
'hesevalves will be full-stroke exercised in Modes4, 5, or 6 when the positive displacement pump isnot OPERABLE.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 4 OF 18
VALVE VALVE¹ NUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF ANDCLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
6 8804A CHARG PP SUCT FROM RHR
8804B SI PP SUCT FROM RHR
9003A RHR HX-I TO CS-A HDR
9003B RHR HX-2 TO CS-B HDR
These gate valves function toline up the Safety InjectionSystem to the Cold LegRecirculation Phase on anaccident condition.
2 B IWV-3411
2 B
2 B TST REQ-EF
2 B TST FRQ-Q
These valves cannot be exercised during poweroperation because they are interlocked with valves2-8982A, 8 (Containment Sump Isolation Valves) thatare required to be closed with power to the valveoperators removed by Technical SpecificationSurveillance Requirement 4.5.2. Valves 2-8982A or B
cannot be opened during power operation becausethis would result in one train of the RHR systembeing not OPERABLE. Valve 2-8982A or B cannot beopened during cold shutdown because they areinterlocked with valves 2-8700A, B (RHR Pump SuctionValves) which would have to be closed. With valve2-8982A or B opened in this configuration, it isquite likely that the water from the piping betweenvalve 2-8700A or 8 and the sump valve connection willbe discharged through valve 2-8982A or B into thecontainment sump. This'ater will interfere withthe RCS sump level/flow leakage detection system andvoid the suction piping requiring refilling and ventingthe piping, If an LOCA occurred under this condition,extensive time would be required to recover from thisabnormal lineup. Also, during cold shutdown valves2-8804A, B and 2-9003A, B cannot be exercised open becauthey are interlocked with valve 2-8701 and 2-8702 (RCSLoop-4 TO RHR ISOLATION VALVES) in the closed position.2-8701 and 2-8702 are required to be open and closing onethese valves would result in both RHR train incapable ofremoving decay heat from the core. Valves 2-8804A, B ani2-9003A, 8 will be full-stroke exercised during refuelinioutages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAMI
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERV ICE TESTINGVALVE PROGRAM
PAGE 5 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF ANDCLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
7 8819A SI TO COLD LEG-1 CK
8819B SI TO COLD LEG-1 CK
8819C SI TO COLD LEG-1 CK
8819D SI TO COLD LEG-1 CK
8905A SI TO HOT LEG-1 CK
89058 SI TO HOT LEG-2 CK
8905C SI TO HOT LEG-3 CK
8905D 'I TO HOT LEG-4 CK
8922A SI PP-1 DISCH CK
8922B SI PP-2 DISCH CK
1 A,C
1 A,C
IWV-3521
IWV-3522
1 A,C TST REQ-EC
1 A,C TST FRQ-Q
1 C
1 C
1 C
1 C
2 C
2 C
These valves cannot be exercised during poweroperation because the safety injection pumps donot 'develop sufficient head to overcome RCS pressure.
These valves cannot be exercised during coldshutdown because the safety injection pumps arerequired to be inoperable by Technical SpecificationSurveillance Requirement 4.5.3.2. to protect againsta low temperature over pressurization of the RCS.Also during cold shutdown there may not be sufficientvolume in the RCS to accomodate the amount of waterneeded to full-stroke exercise these valves. Thesevalves will be full-stroke exercised during refuelingoutages.
These check valves function tosupply flow from the safetyinjection pumps to the RCS.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 6 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF ANDCLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
8 8820 BIT COLD INJECT CK
8900A BIT LOOP-1 COLD INJECT CK
8900B BIT LOOP-2 COLD INJECT CK
8900C BIT LOOP-3 COLD INJECT CK
8900D BIT LOOP-4 COLD INJECT CK
These check valves function tosupply flow from the BIT to thecold legs on a safety injection.
1 C IWV-3521
IWV-35221 C
1 C TST REQ-EC
1 C TST FRQ-Q
1 C
These valves cannot be exercised during poweroperation because this would require injectinghighly concentrated boric acid solution from theBIT into the RCS resulting in a possible plantshutdown. During power operation these valvescannot be partial-stroke exercised utilizing thebypass line because this could result in bypassingthe BIT, thereby not achieving design flow throughthe BIT if an accident occurred.
Valve 2-8820 will -be partial-stroke exercisedduring cold shutdown utilizing the bypass line(this method will not verify a partial-strokeexercise of the other valves).
These valves cannot be full-stroke exercisedduring cold shutdown because this would requireinjecting the BIT into the RCS which couldsignificantly delay startup from the cold shutdowncondition (the BIT would have to be brought to theproper boron concentration and the RCS would haveto be diluted sufficiently to allow startup).These valves will be ful.l-stroke exercised on theway to or during refueling outages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 7 OF 18
VALVE VALVE¹ NUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF ANDCLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
9 8924 RWST TO CHARG PP CK
This check valve functions tosupply borated water from theRWST to the suction of thecharging pumps.
10 8948A LOOP-1 COLD INJECT CK
8948B LOOP-2 COLD INJECT CK
8948C LOOP-3 COLD INJECT CK
8948D LOOP-D COLD INJECT CK
These check valves function tosupply safety injection flowto the RCS cold legs.
2 C IWV-3521
IWV-3522
TST REQ-EC
TST FRQ-Q
1 A,C IWF-3521
1 A,C IWF-3522
1 A,C TST REQ-EC
A,C TST FRQ-Q
This valve cannot be exercised during poweroperation because this would require injectingborated water from the RWST into the RCS whichcould result in a plant shutdown. This valvewill be partial-stroke exercised during coldshutdown. This valve cannot be full-strokeexercised during cold shutdown because this wouldrequire utilizing the flow path through the BIT.This flow path cannot be utilized during coldshutdown because this would require injectingthe BIT into the RCS which could significantlydelay startup from the cold shutdown condition(the BIT would have to be brought to the properboron concentration and the RCS would have to bediluted sufficiently to allow startup). Thisvalve will be full-stroke exercised duringrefueling outages.
These valves cannot be exercised during poweroperation because the accumulators, RHR pumps andSI pumps do not develop sufficient head to overcomeRCS pressure. These valves will be partial-strokeexercised during cold shutdowns utilizing RHR flow.
These valves cannot be full-stroke exercised duringcold shutdowns because this would invol.ve personnelentry inside the secondary shield area to verifyall valves fully stroked. Entry into this areacould result in excessive radiation exposure.
These valves will be full-stroke exercised duringrefueling outages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 8 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
11 8949A SI TO HOT LEG-1 CK
8949B SI TO HOT LEG-2 CK
8949C SI TO HOT LEG-3 CK
89490 SI TO HOT LEG-4 CK
These check valves function tosupply safety injection flowto the RCS hot legs.
1 C IWV-3521
1 C IWV-3522
) C TST REQ-EC
1 C TST FRQ-Q
Valves 2-8949 C 5 D cannot be exercised duringpower operation because the safety injection pumpsdo not develop sufficient head to overcome RCS
pressure. Valves 2-8949 A 5 B cannot be exercisedduring power operation because the RHR or safetyinjection pumps do not develop sufficient head'toovercome RCS pressure. These valves cannot beexercised during cold shutdown because the safetyinjection pumps are required to be inoperable byTechnical Specification Surveillance Requirement4.5.3.2 to protect against a low temperature overpressurization of the RCS. Valves 2-8949 A 5 8 cannotbe exercised during cold shutdown using the RHR pumpbecause this would result in short cycling the coreand not removing decay heat proper ly. These valveswill be full-stroke exercised during refueling outages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERV ICE TESTINGVALVE PROGRAM
PAGE 9 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
12 8956A ACCUM-1 DISCH CK
8956B ACCUM-2 DISCH CK
8956C ACCUM-3 DISCH CK
8956D ACCUM-4 DISCH CK
These check valves function toprevent backflow from the RCS
into the accumulators duringnormal operation. These valvesopen to supply flow from theaccumulators to the RCS duringan accident condition.
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
1 A,C IWV-3521
1 A,C IWV-3522
1 A,C TST REQ-EC
1 A,C TST FRQ-Q
~ These valves cannot be exercised during poweroperation because the accumulator will not overcomeRCS pressure.
These valves cannot be exercised during cold shutdownsbecause this could result in a possible low temperatureover pressurization of the RCS. Full-stroke testingof these valves during refueling outages is notfeasible because of the resulting water surge into thereactor vessel and potential for high airborne radconproblems. These valves are not equipped with mechanicalexercisers, position indicators or differential pressureinstrumentation. They cannot be isolated or visuallyinspected. These valves will be partial-strokeexercised during refueling outages.
13 8977 RWST TO SI PP CK
This check valve functions tosupply borated water from theRWST to the suction of thesafety injection pumps.
2 C IWV-3521
IWV-3522
TST REQ-EC
TST FRQ-Q
This valve can only be partial-stroke exercisedduring power operation. It cannot be full-strokeexercised because the safety injection pumps do notdevelop sufficient head to overcome RCS pressure.This valve cannot be exercised during cold shutdownbecause the safety injection pumps are required tobe inoperable by Technical Specification SurveillanceRequirement 4.5.3.2. to protect against a lowtemperature over pressurization of the RCS. Thisvalve will be full-stroke exercised during refuelingoutages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DiABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 10 OF 18
VALVE VALVE¹ NUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
14 8981 RWST TO RHR PP CK
This check valve functions tosupply borated water from theRWST to the suction of theRHR pumps
2 . C IWV-3521
IWY-3522
TST REQ-EC
TS FRQ-Q
This valve cannot be exercised during poweroperation because the RHR pumps do not developsufficient head to overcome RCS pressure.
This valve cannot be exercised during coldshutdown because both RHR pumps must be alignedto remove decay heat from the RCS so no pathexists for full-stroke exercising this valve.This valve will be full-stroke exercised duringrefueling outages.
15 8982A- CONT RECIRC TO RHR PP-1 ISO OC 2 B IWV-3411
89828 CONT RECIRC TO RHR PP-1 ISO OC 2 B TST REQ-EF
TST FRQ-QThese gate valves function toline up the RHR pumps to take '
suction from the containmentrecirculation sumps during thecold leg recirculation phaseof an accident condition.
These valves cannot be exercised during poweroperation because they are required to be closedwith power to the valve operators removed byTechnical Specification Surveillance Requirement4.5.2. If these valves were opened during poweroperation, this would result in one train of thethe RHR system being not OPERABLE.
These valves cannot be exercised during coldshutdown because opening one of these valvescould introduce air into the suction piping ofthe RHR pumps, causing the RHR pumps to be notOPERABLE for an extended period of time.
These valves will be full-stroke exercisedduring refueling outages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME.SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE 'PROGRAM
PAGE 11 OF 18
VALVE VALVE¹ NUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS 'CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
16 HCV-637 RHR HX-1 OUTLET
HCV-638 RHR HX-2 OUTLET
These valves are air-operatedbutterfly valves which may bepositioned from the main controlroom. By manually adjustingthese valves, the flow throughthe heat exchangers may becontrolled.
17 874OA RHR TO HOT LEG-1 CK
8740B RHR TO HOT LEG-2 CK
These check valves function tosupply RHR flow to the RCS hotlegs 1 and 2.
2'
IWV-3412
2 B IWV-3413
TST REQ-EF
TST FRQ-Q
1 C IWV-3521
1 C IWV-3522
TST REQ-EC
TST FRQ-Q
These valves have no limiting value of fullstroke time because they are remotely controlledby manual adjustment of a potentiometer. Thestroke times of these valves are dependent onhow fast the operator adjusts the potentiometersthat control the valves'pening and closing.These valves have no remote position indication.
These valves will be full-stroke exercised on aquarterly frequency without measurement of stroketime. This exercise will include observation ofsmooth operation of the valves over their fullrange of travel.
These valves cannot be exercised during poweroperation because the RHR pumps do not developsufficient head to overcome RCS pressure.
These valves cannot be exercised during coldshutdown because this would result in shortcycling the core, thereby not removing decay heat.
These valves will be full-stroke exercised duringrefueling outages.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 12 OF 18
VALVE VALVENUMBER DESCRIPTION AND FUNCTION
18 9002A CS PP-1 DISCH CK
9002B CS PP-2 DISCH CK
These check valves function tosupply water from the contain-ment spray pumps to the ringheaders in containment.
VLV VLV CODE
CLS CAT RE UIREMENT
2 C IWV-3521
2 C IWV-3522
TST REQ-EC
TST FRQ-Q
BASIS FOR REQUESTING RELIEF AND
TESTING IN LIEU OF RE UIREMENTS
These valves cannot be exercised during poweroperation because the system alignment fortesting them would result in one train of thecontainment spray system being not OPERABLE.These valves cannot be exercised during coldshutdown because the system alignment for testingwould result in one train of the RHR systembeing not OPERABLE. During cold shutdown, bothRHR trains must be aligned to remove decay heatfrom the RCS.
These valves will be full-stroke exercisedduring refueling outages.
19 9011A- CS HDR-A ISO CK IC
9011B CS HDR-B ISO CK IC
These check valves function tosupply spray water to the ringheaders in containment. Inthe closed position they pro-vide a containment isolationfunction.
2 A,C IWV-3521
2 A,C IWV-3522
TST-REQ-EC
TST FRQ-Q
These valves cannot be exercised during poweroperation, at cold shutdown, or during refuelingoutages because flow through these valves wouldresult in spraying down the containment. Thiswould cause problems with wet lagging, corrosionof components inside containment, etc. Theonly practical method of verifying operabilityof these check valves is by disassembly.
These valves will be disassembled and internallyinspected (mechanical exercise) to verifyOPERABILITY. This inspection will be performedat a frequency of at least once per five years.
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
REQUEST FOR RELIEF FROM CODE REQUIREMENTS
INSERVICE TESTINGVALVE PROGRAM
PAGE 13 OF 18
VALVE VALVE¹ NUMBER DESCRIPTION AND FUNCTION
VLV VLV CODE BASIS FOR REQUESTING RELIEF AND
CLS CAT RE UIREMENT TESTING IN LIEU OF RE UIREMENTS
FCV-662 EXCESS CONT 'PRES/VAC RLV ISO ICT.S. A
FCV-663 EXCESS CONT PRES RLV ISO OC T.S. A
TST REQ-EF
TST-FRQ-Q
FCV-664 CONT VAC RELIEF OC
RCV-ll CONT PURGE EXHAUST ISO IC
RCV-12 CONT PURGE EXHAUST ISO IC
T.S. A
T.S., A
T.S. A
20 FCV-660 CONT PURGE SUP ISO IC T.S. A IWV-3411
FCV-661 CONT PURGE SUP ISO IC T.S. A
These valves are required to be leak-rate testedevery time they are cycled per TechnicalSpecification 3.6.3. Since these valves arenormally closed, routine quarterly exercising will.result in otherwise unnecessary leak rate testing.Therefore, these valves will be full-strokeexercised each cold shutdown. Also, these valvesare limited by Technical Specification 3.6.1.7 tobe open less than or equal to 200 hours percalendar year.
These valves function toprovide containment ventila-tion isolation.
4
4
I'
CO
(.4
rt
'4@
r~
I4
4
CC
CJ( y\
Cl
4I
k~i I'
I
'I tI
C"
IJ
I
1
I
I
4
IJ
.C
r.
CL
4
4
~'- I,
1
ty
I
f;I
~ I
C'''
C
V
t
r,I'
I
*4
I
4.
I
I'
I J
Ih4 l" 4
t4
~ ~ ~t ttJ
I
(I /''1
l
~ 4 IQ-
t 4
) ~
4 /4
4
C
t~"* 4<I
lg
I
I
4
4t
PGandE DIABLO CANYON POMER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COHHON PUHP AND VALVE TESTING PROGRAH
ASHE SECTION XI 1977 EDITION {ADDENDA THROUGH SUHHER 1978)
COLD SHUTDOWN TESTING STATEHENT
INSERVICE TESTINGVALVE PROGRAH
PAGE 14 OF 18
1
2
VALVENUHBER
FM-2-96FW-2-98FW-2-367FM-2-368FCV-2-438FCV-2-439FCV-2-440FCV-2-441
FW-2-348FW-2-350FW-2-352FM-2-361.FW-2-362FW-2-363FM-2-369FW-2-370FM-2-371FW-2-372FM-2-373FW-2-374FW-2-375FW-2-376FW-2-377FM-2-378FW-2-379FW-2-380
FCV-41FCV-42FCV-43FCV-44
PCV-19PCV-20PCV-21PCV-22
JUSTIFICATION FOR VALVES TO .BE TESTED AT A COLD SHUTDOWN FRE UENCY
These Hain Feedwater Check Valves and Feedwater Isolation Valves cannot be exercised during poweroperation because closing these valves would require securing feed flow to a steam generator whichwould result in a reactor trip. Three loop operation has not been analyzed for at Diablo CanyonPower Plant and is not allowed.
These Auxiliary Feedwater Supply Check Valves cannot be full-stroke exercised during power operationbecause the only available flow path is into the steam generators which could result in thermal shockto the associated piping and fittings. These valves will be full-stroke exercised during a shutdownto, or a startup from, a cold shutdown condition.
These Hain Steam -Isolation Valves cannot be full-stroke exercised during power operation because thiswould require securing steam from a steam generator which could result in a reactor trip. Three loopoperation has not been analyzed for at Diablo Canyon Power Plant and is not allowed.
These Atmospheric Dump Valves cannot be exercised during power operation because this could result ininadvertent safety injection actuation.
Cv
eCl C
\ ~
0.C
CP
CI ~
I4
tB
C')fr?
~uVICP
MsQh
J
IU~
to?
I
1't>
C
u»
t,r
I
lov
»4 I
4
1'
4
~,?
I
'I
llur
o«
4
0'ol
I o.
tt»
0
rrII
I
ro
I
J
IN'I
4 ~
lv~ IC
C u ~ 0s
M C'c
~ QI
t>L
CL?
ui~ C«„
I
1 r l
'1
I
c
IM
1
C;
~ C? r'y
Cvs
C"
~ ~
,u l: lr
CC .
I
tv~ V u I,
~ o
~ = t''
vC
I CC?
I
I
IUI ~ 'I
II
4
~''
"»I
I
~ vr « I
or
Irl~ 4 Pl Cut
C»I 'I
"1 s
o»o
PC.
'Ir
D
Cp
It!s
~ « I
t I
~ IC
40'
or
v'&
u
~ I
CV l0
I
v
v-'rC'
'» ~
~~ ~ l
I ~
Cv
1
Q?I
~Co~4
I
')
W rv
I » ~
~ W ~
ru
C ~
I
«'I 'r
C?~l Q'C ' t?
0'
SVC
0? Ct,cg „Cl tr
4 ~
'4
C ~
C:;
rC'
4
Cv
»J'I
1
~ P
c'1
I~
*
% CG.C1
~'I r»rr p4UA
vu 40ovh
IcJ
~ CJ
~ «
A l
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
COLD SHUTDOWN TESTING STATEMENT
INSERVICE TESTINGVALVE PROGRAM
PAGE 15 OF 18
10
11
12
VALVENUMBER
PCV-455CPCV-456PCV-474
8078A8078B8078C8078D
LCV-112BLCV-112C
81008112
81058106
81078108
814581488377
8152
JUSTIFICATION FOR VALVES TO BE TESTED AT A COLD SHUTDOWN FRE UENCY
These Power Operated Relief Valves should not be exercised during power operation by NRC direction. ThNRC's current position is that these valves will be full-stroke exercised during the approach to coldshutdown.
These Reactor Vessel Head Vents should not be exercised during power operation by NRC direction.The NRC's current position is that these valves will be full-stroke exercised during cold shutdown.
These Volume Control Tank Outlet Isolation Valves should not be exercised during power operationbecause failure of either valve in the closed position would result in a loss of reactor system levelcontrol or injecting 2000 ppm boric acid solution from the RWST into the reactor coolant system,resulting in a possible plant shutdown.
These Reactor Coolant Pump Seal Water Isolation Valves cannot be exercised during power operationbecause this would result in challenging the relief valve in the RCP seal water return line. If thisrelief failed in the open position, this would result in unnecessary reactor coolant system leakage.
These Centrifugal Charging Pump Recirculation Isolation Valves should not be exercised during poweroperation because failure of either valve in the closed position could result in pump damage if a
secondary system accident occurred.-
These Charging Line Isolation Valves should not be exercised during power operation because failureof either valve in the closed position could result in loss of reactor coolant system level control,which could result in a plant shutdown. Also, failure of either of these valves in a closed positionwould place the plant in an LCO action statement due to a loss of the boration flow path from theboric acid tanks.
These Pressurizer Auxiliary Spray Valves should not be exercised during power operation becausefailure of either valve in the open position could result in a loss of reactor coolant systempressure control which could result in a plant shutdown.
This Letdown Line Isolation Valve should not be exercised during power operation because failure ofthe valve in the closed position could result in a loss of reactor coolant system level control whichcould result in a plant shutdown.
a
rl rIJa 5
Cr,
acr
C5a5 ID
0 84 CD
0,
«0IMI
C'
:D. 5CC~ -mrs
IIr
tdI
'rl g
CS'
rCD
2J>
CD
4
4
CV
~ CCS
LI
t rCatt
P
Pg
I l
5
rvC:
CI ~
I'0
Cra
1'I~ t
Ctl
& %5
~ ~ CDalt> SD
rI.l
CP
C.
g
LS
M Ca a
0lr I
IV0CD
Cr0f .I.~ ~ MI
0
I
CD CD
—0C.I'JC
Cr tJ
CICL 0~ «II II
Qa0
0 CD !'IC. ~ 0
r0
ED
tg ~
Bh'D
r52
ta ~ I I
CD W.= r.C'.a
~I M lg
M ~
IJ)ACJOC..
CM CD
w
'aaa2 A '.aI'Q'~O Cl,a C
5''C
<v
(w'"
I~wl
a
0~~ CD
SI(M'D
Ct
f52
I
CP
0 I
CCD
ta, I
0 r
CI
0CM
ID1 ~
~1
0
r.C
r 5
~r
C,c ral
SQ
t.iw
CDla I
I ~ )
CD
Li CCC
I
v)
Ct~ ~
cr
M CD
'Sa.. A
I0
a
C.;
~,1f'I
~ ' 1al
I
I
I'r
CQ
J
sQ
CDI
I IM
ttr ~
LM
C'M1
CD
aV0
0J
Cr
~ P
a
0~ ILr
4
I
I r0I
SL J'
ra
P
I CC vI
arIJ
P''
I
~ ~
I 'I ~
rcp
I I
CD QI1
S
~ '
~ ~ C':
'«I
~ IIa
I
\t I
0
«l
~ II
rv
I . (
~ V
r55',I0
~ 1
i
~ IS
CI
<4. 0cr
I
ri
CID
0C'
~
~ I
ICJ
CD
CI
'W
I
~a
P
a I
~r
~ I
~rC'I
)
Ci
~ ~I
I
C
ICM
t
4
a,. V
('
I ~
5
I'4 ':II
I
'I 5'
I
~ a'I
P
PJ ~ ~r
t~ I .C'.
~ I
~ 5
ICr C
I IC
*'rr' L2
MJ
~ J
(r\ I
~ 'I
"r7
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
COLD SHUTDOWN TESTING STATEMENT
INSERVICE TESTINGVALVE PROGRAM
PAGE 16 OF 18
13
14
15
16
17
18
19
20
VALVENUMBER
8802A8802B
8808A8808B8808C8808D
8809A88098
8818A8818B8818C8818D
8835
8974A8974B
8976
8980
JUSTIFICATION FOR VALVES TO BE TESTED AT A COLD SHUTDOWN FRE UENCY
These Safety Injection Pump Discharge Isolation Valves cannot be exercised during power operationbecause they are required to be closed with power to the valve operators removed by. TechnicalSpecification Surveillance Requirement 4.5.2. If these valves were opened during power operation,safety injection flow would go to the hot legs instead of the cold legs. The safety analysis hasanalyzed for flow going to the cold legs and not the hot legs.
These Accumulator Isolation Valves cannot be exercised during power operation because they arerequired to be open by Technical Specification Limiting Condition for Operation 3.5.1. Also, thesafety analysis does not cover one accumulator being isolated and a failure in another accumulatorline.These RHR to Cold Legs Isolation Valves cannot be exercised during power operation because they arerequired to be open with power to the valve operators removed by Technical Specification SurveillanceRequirement 4.5.2.These RHR to Cold Legs Check Valves cannot be exercised during power operation because the RHR pumps
do not develop sufficient head to overcome reactor coolant system pressure.
This Safety Injection to Cold Legs Isolation Valve cannot be exercised during power operation becauseit is required to be open with power to the valve operator removed by Technical SpecificationSurveillance Requirement 4.5.2. Also failure of this valve in the closed position would result inthe entire safety injection system being not OPERABLE.
'hese Safety Injection Pumps Recirculation to the RWST Isolation Valves cannot be exercised duringpower operation because they are required to be open with power to the valve operators removed byTechnical Specification Surveillance Requirement 4.5.2. Also the failure of one of these valves inthe closed position could result in damage to the safety injection pumps, thereby rendering theentire safety injection system not OPERABLE.
This RWST to Safety Injection Pumps Isolation Valve cannot be exercised during power operationbecause it is required to be open with power to the. valve operator removed by TechnicalSpecification Surveillance Requirement 4.5.2. Also failure of this valve in the closed positionwould result in the entire safety injection system being not OPERABLE.
This RWST to RHR Pumps Isolation Valve cannot be exercised during power operation because it isrequired to be open with power to the valve operator removed by Technical Specification SurveillanceRequirement 4.5.2. Also, failure of this valve in the closed position would result in the entire RHR
~~~~inn nnt OPFPARl F
~ ~
CX"C"utCls
J2
C ~
\
LeCf
»'I
')
J
C
~ ~
r~r, ~
C(
cI
lCII"
Ct'»
C.
I It
np cs
t ~t
CCI
v~ i
Ui
~vtr
Ig
A
ss
I i E
aIif
(I
r~
~vl
LCI
Ut
II
I'
rl
CC
Cd
C IIV
~ ~ I
~ QP ~ sI
I '
Q
h g -i)
l
A rt
C~(
Csr
40
t
I
~~
~''sr~
t'p
I" QsgQ
I '
(.I
«I CJI
'C '\I
C,Vrt g.+'I
'I
J
W ~
CvtCf«I
n~ II
4»
Q it'
lrl
'I
14
'C VI~ I
JI
~ I tr
C44
r stV
~v
II
ctn'f
~»
r,
.r~ '
I
Zl
C'r
I IV
a.
1
1
CI
Cf cI«I V".
I
rQ
P
QI
CJ
n~t't'
"I
~ W
~I
~ IVI
III
r
(MI(
~rs
~ VI
ti
rtIV'
C
I\
IL
I'
r
I
'VI
I VI
( ~
~ 4
~ I
r ~
I
C'I
I'ICC
CD I,
. A A,A
"SI >"
CVI rt
I
tt> P-'
~ '>C
trr I4
I
I isI ~
MrVr'
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT — UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
COLD SHUTDOWN TESTING STATEMENT
INSERVICE TESTINGVALVE PROGRAM
PAGE 17 OF 18
VALVE¹ NUMBER
21 87018702
22 8703
23 8730A8730B
24 8994A8994B
25 8998A8998B
26 FCV-355FCV-356FCV-357FCV-363FCV-749FCV-750
JUSTIFICATION FOR VALVES TO BE TESTED AT A COLD SHUTDOWN FRE UENCY
These Reactor Coolant System to RHR System Isolation Valves cannot be exercised during power operationbecause they are required to be closed with power to the valve operators removed by TechnicalSpecification Surveillance Requirement 4.5.2. Also, they are interlocked with reactor coolant systempressure and cannot be opened if the pressure is greater than 390 psi.This RHR to Hot Legs Isolation Valve cannot be exercised during power operation because it isrequired to be closed with power to the valve operator removed by Technical SpecificationSurveillance Requirement 4.5.2. Also, failure of this valve in the open position would result indiversion of flow from the analyzed flow paths.
These RHR Pump Discharge Check Valves cannot be full-stroke exercised dur ing power operation becausethe RHR pumps do not develop sufficient head to overcome reactor coolant system pressure.
These NAOH to Containment Spray Eductor Isolation Valves cannot be exercise during power operationbecause they could introduce NAOX into the RWST and subsequently into the reactor coolant systemcausing Na
<activation problems and possible chemical damage to components in the reactor
coolant,'ystem.
T prevent getting NAON into the RNST, valve B992 would have to be closed and the lineflushed, which would result in the entire Spray Additive System being not OPERABLE.
These Spray Additive Tank Outlet Check Valves cannot be exercised during power operation because thesystem alignment for testing these check valves would result in the entire Spray Additive System
being not OPERABLE.
These Component Cooling Water Isolation Valves cannot be exercised during power operation becausethis could result in damage to the reactor coolant pumps and a possible plant trip.
T
PGandE DIABLO CANYON POWER PLANT-UNIT 2
DIABLO CANYON POWER PLANT - UNIT 2 AND COMMON PUMP AND VALVE TESTING PROGRAM
ASME SECTION XI 1977 EDITION (ADDENDA THROUGH SUMMER 1978)
COLD SHUTDOWN TESTING STATEMENT
VALVENUMBER JUSTIFICATION FOR VALVES TO BE TESTED AT A COLD SHUTDOWN FRE UENCY
INSERV ICE TESTINGVALVE PROGRAM
PAGE 18 OF 18
27 FCV-235FCV-236
;F.CV-731..F.,CV.-.238
,FC,V-'.239
,F.GV.-,240,FCV.-,658)F;CY-.65,9FCV-668FCV-669P'CV-696FCV-697FCQ-698FCV-.699FCV-700.
VAC-252'AC.-253i
N
These Containment Sample Isolation Valves cannot be exercised during power operation because—Technical Specification Suryeil,lance Requirement 4..6.1:;li 'rendu'ives these valves to be closed when