GU』ARAT POLLUtt10N CONTROL BOARD

66
GU』 ARAT POLLUtt10N CONTRO Regional Office, Bharuch Address: C-1l119/3, GIDC ESTATE, PHASE-ll, NARMADANAGAR, BHARUCH-392015 E maiHD: Phone no: (02542) 246333 It is hereby informed that as per the Ministry of Environment and Forests, Government of lndia, New Delhi vide its notification no. S.O. 1533 dated L4|O9/20[,6 and its subsequent amendment S.O. 3067 (E) dated OL/L2/aoof, Public Hearing is arranged for M/s. Methmani Flnechem timited, at plot No. CH-1/CH-2, GIDC Dahej, Taluka: Vagra, District: Bharuch, Gujarat covered under category l(d) of Category "8" as mentioned in their request application. A copy of draft Environment lmpact Assessment Report and the Summary of Environment lmpact Assessment Report were sent to the following authorities or offices to make available the draft EIA report for inspection to the public during normal office hours, till the Public Hearing is over. 1. The District Collector Office, Bharuch. 2. District Development Office, Bharuch. 3. District lndustry Center, Bharuch. 4. Taluka Development Office, Tal: Vagra, Dist: Bharuch. 5. The Chief Conservator of Forest, Ministry of Environment and Forest, GOl, Regional Office (West Zone), Kendriya paryavaran Bhavan, E-5 Arera Colony, Link Road-3, Ravisankar Colony, Bhopal - 462015. 5. Regional Office, Gujarat Pollution Control Board, Shed No. C-1, 119/3, G|DC, phase- , Narmadanagar, Bharuch - 392015. Other concerned persons having plausible stake in environmental aspects were requested to send their responses in writing to the concerned regulatory authorities. The Public Hearing was held on 0203/2018 at 11:OO hrs. at Project site of Meghmani Finechem Limited, Plot No. CH-VCH-2, GIDC Dahej, Taluka: Vagra, District: Bharuch, Gujarat. An advertisement in English was published in "The Times of tndia" on oL/o2/2oLB and in Gujarati in "sandesh" dated 0t/o2/2o18. Shri C.B. Balat, Resident Additional Collector & Additional District Magistrate, tharuch supervised and presided over the entire public hearing process. A statement showing participants present during the public hearing is enclosed as Annexute - A.

Transcript of GU』ARAT POLLUtt10N CONTROL BOARD

GU』ARAT POLLUtt10N CONTROL BOARDRegional Office, Bharuch

Address: C-1l119/3, GIDC ESTATE, PHASE-ll, NARMADANAGAR, BHARUCH-392015E maiHD: Phone no: (02542) 246333

It is hereby informed that as per the Ministry of Environment and Forests, Government of lndia,

New Delhi vide its notification no. S.O. 1533 dated L4|O9/20[,6 and its subsequent amendment S.O.

3067 (E) dated OL/L2/aoof, Public Hearing is arranged for M/s. Methmani Flnechem timited, at plot

No. CH-1/CH-2, GIDC Dahej, Taluka: Vagra, District: Bharuch, Gujarat covered under category l(d) of

Category "8" as mentioned in their request application.

A copy of draft Environment lmpact Assessment Report and the Summary of Environment

lmpact Assessment Report were sent to the following authorities or offices to make available the draft

EIA report for inspection to the public during normal office hours, till the Public Hearing is over.

1. The District Collector Office, Bharuch.

2. District Development Office, Bharuch.

3. District lndustry Center, Bharuch.

4. Taluka Development Office, Tal: Vagra, Dist: Bharuch.

5. The Chief Conservator of Forest,

Ministry of Environment and Forest, GOl, Regional Office (West Zone), Kendriya paryavaran Bhavan,

E-5 Arera Colony, Link Road-3, Ravisankar Colony, Bhopal - 462015.

5. Regional Office, Gujarat Pollution Control Board, Shed No. C-1, 119/3, G|DC, phase- , Narmadanagar,

Bharuch - 392015.

Other concerned persons having plausible stake in environmental aspects were requested to send their

responses in writing to the concerned regulatory authorities.

The Public Hearing was held on 0203/2018 at 11:OO hrs. at Project site of Meghmani Finechem Limited,

Plot No. CH-VCH-2, GIDC Dahej, Taluka: Vagra, District: Bharuch, Gujarat.

An advertisement in English was published in "The Times of tndia" on oL/o2/2oLB and in Gujarati in

"sandesh" dated 0t/o2/2o18.

Shri C.B. Balat, Resident Additional Collector & Additional District Magistrate, tharuch

supervised and presided over the entire public hearing process.

A statement showing participants present during the public hearing is enclosed as Annexute - A.

GUJARAT POLLUT10N CONTROL BOARDRegiOna!(〕ffice,Bharuch

Address:C-1/119/3,GIDC ESTATE,PHASE しNARMADANAGAR,BHARUCH-392015E mal‖ D: Phone no:{02642}246333

A statement highlighting issues raised by the participants and responded by the representative

of the applicant during the public hearing in English and Gujarati Languages is enclosed as Annexure B &

B1 respectively.

A copies of responses received in writing from other persons having plausible stake and written

representation received during Public Hearing in environmental aspects are enclosed herewith

collectively as Annexure - Cl to C29 and the replies by applicant to the same are enclosed herewith

collectively as Annexure - D1 to D29. copies of Public Hearing advertisements as published in Local

Gujarati & Local English newspaper is provided in Annexure - E1 to E2.

 

 

rd

an   “

 

 

晩 呻

Res:dentl:lィ lil[1111111。 r

&Additiona:District

Magistrate,Bharuch

Encl:

Mノs.Meghmani Finechem Ltd

Plot No. CH-1/CH-2′ GIDCDah可′Taluka:vagra,

District:Bharuch

07′03/2018

1)Annexure A,B,Cl to C29,Dlto D29,El to E2 as above

2)Video DVD of Pub‖ c Hearing

3)CD of Public Hearing Proceeding

ANNEXURE - 8 IENGUSHIA statement showinq issues raised by the oarticioants and resoonses bv the reoresentatives of the

aoolicant durine the public hearinr

As per the provision of notification no. S.O.1533 dated L4/Ogl2OO6 and subsequentamendment S.O.3067 (E) dated I't December 2009, Ministry of Environment, Forests and Climate

Change, Government of lndia, proposed project by M/s. Meghmani Finechem Ltd. For the proposed

expansion of Thermal Power Plant - (1) Power plant-5s MW to 132 MW and (2) Steam (lncludingprocess & power) -290 TPH to 650 TPH covered under category 1(d) of "B" of above referrednotification. Public hearing was conducted on 07lO3l2O78 at 11:00 Hours at the project site of M/s.Meghmani Finechem Ltd. at Plot No. CH-1/CH-2, GtDC Dahej, Ta. Vagra, Dist. Bharuch (GU.,ARAT)

under the chairmanship of Shri C.8.Balat, Resident Additional Collector & Additional DistrictMagistrate, Bharuch.

Shri R.R.Vyas, Regional Officer, Gujarat Pollution Control Board, Bharuch welcomed allpresent to the Public Hearing. He outlined the various provisions of the notification and briefedabout the procedural details for conducting this public hearing and the advertisement published inlocal daily newspaper. He announced that as per the notification only locally affected persons will be

allowed to make their representation in the public hearing while having plausible stake may submittheir representation in writinB which would be included in proceedings, he made it clear that all therepresentations/ guestions raised during public hearing will be included in the proceedings of thehearing.

The public hearing was declared open with the due permission of the Chairman and invitedthe Project Proponent to start their presentation in Gujarati language.

Representative of M/s. Meghmani Finechem Ltd. presented information about company andthe proposed project in detail including technical information, Environmental Management System,

effects of the proposed project on environment and control measures proposed and socialresponsibility of the industry in Gujarati through power point presentation.

After completion of the presentation Shri C.B.Balat, Resident Additional Collector &Additional District Magistrate, Bharuch informed to the audience the following:

. The purpose of the ongoing public hearing.

o The representations of the nearby 21 affected villages specially related to plant andenvironment would be discussed.

. The presentation should be made by the representative after providing his name and villagename. Representatives other than those who are not from the above discussed 21 villagescan make written representation over here and the reply of the same will be given by thecompany.

. Neutral decision will be taken in the interest of the people considering the matters relatedto environment, plant and employment without discussing about any other matter on thisplatform.

. All representations will be recorded and then after the same will be forwarded to the upperlevel of State Committee.

After the presentation, with due permission of the chair, the representative of GpCB openedthe forum for representations; objections; or questions from the locally affected people.

Page l of 7

The statement showing issues raised by the participants and response made by the representative ofthe applicant during public hearing are as under.

Sr.

NoName and Address Point Represented and

written submissionReplies givenby concerned

officer1 Shri Jaydeepsinh

Ramsinh Rana(Sarpanch)

Vill: Dahej

Dist: Bharuch

. To spent CSR fund inDahej by MeghmaniCompany, one weekbefore the meeting was

the

representatives of thecompany. Assuranceletter for spending 50Lacs fOr the

constructionEntrancereceived.

Of

o We appreciate theinitiative taken by thecompany to provideemployment to localpeople and we requestto increase pay scale ofthe locals working sincemany years. Requestyou to take care of nodiscrimination foremployments of localpeople.

o Monthly recurring costto run STP of Dahejvillage is very high. lfcompany utilize treateddomestic water of STP,

it will reduce theoperational cost.

. We are thankful tothe Sarpanch ofDahej village and

w■ h

request as well asyour suggestion willbe noted. Weconsider Dahej andnearby villages as

our own village andwe are reallythankful to 27villages who have

supported us sincelast 10 years.

Present GIDC andDahej lndustrialAssociation jointlytaken the initiativesto reuse the treatedsewage water.

2 Shri Pushkarsinh Rana,

Vill: Dahe.i

Oist: tharuch

. Company would spendits CSR funds inconsultation with theaffected 21 villages fortheir requirement andsatisfactory needs.

. This village is stillbackward in educationfield. Request you todevelop industrial

and provide

. Chairmaninformed that

appreciablework of thecompany.Companymust takecare to utilizethe csR fundsfor theeducation

Page 2 of 7

Replies by concernedProiect Proponent

sedor

technical institutions forthe locals for theirhigher studies.

. lt is also appreciablethat company has

worked for thetechnical education,land losers, and alsoprovided the educationalong with the skilledcertificate to theunskilled people.

o The land has beenacquired by the GIDC

and that land is given tothe company, they arenot providing thebenefits which is to berequested.

. GIDC must do thecommission of CETP atthe earliest and also totake the appropriateaction for control ofwater scarcity duringsummer. Suitable Planhas to be made byGIDC, lndustries andleaders of the villaBes toensure drinking watersupplies and use ofwater utilized inindustries so that thesituation of closure ofcompany will not occur.During the high tide, thewater become turbid inthe raw water suppliedby GIDC and for thatreason health peopleget affeAed. lnupcoming days thisproblem is to be getresolved so that thiscondition will not affectvigorously.

and health of

the l● cals_

Page 3 of 7

Sr.蘭

Name and Address Point Represented andwritten submission

Replies by concernedProject Proponent

Replies given

by concernedofficer

Point Repres€nted andwritten submission

Shri Ranjitbhai Gohil,Village: Dahej,

Dist: Bharuch

. Since last 2007, thisplant has beenoperational; thecompany has not onlytaken the locals for thejobs but also promotedthe people even in HR

department which is

appreciable.

. Company has given theemplovment to the 80young people of the

Shri Jayend rasinhPravinsinh Rana,

Vill.: Dahei,

Dist,: Bharuch

Company has not spentCSR funds since last 10

company has

committed to providefund for construction ofvillage Gate. How muchfund will be providedby the company for theconstruction of awashfor the people ofscheduled caste andwithin how much timethe same will beprovided?

. Attempt should bemade to develop thegreen belt before thestarting of productionprocess of the plant.

Yearly planning ofthe CSR fund has

been done by thecompany and thesame will be utilizedaccording to theirrequirementdiscussing withvillagerePresentatives.

This project has

been sponsored byWorld Bank and ithas given guidelinesfor utilization of CSR

fund.

33Y. of thegreenbelt will bedeveloped within ayear.

. Chairmaninformedthat, thereareschemes ofthegovernmentfor awash

discussingwith theTDO andobtainingrequiredinformationthe benefitof the samecan beavailed.

Shri MahendrasinhKhumansinh Gohil,Vill.: Dahei,Dist.: Bharuch.

. Three days agocompany had declinedto provide theemployment to thepeople who weregoing for their medicalexamination.

. Management willbring the solution ofthe issue withinshort time.

Shri Suleman Patel,(Ex- Dy. Sarpanch),Vill.:Jolva,Dist.: Bharuch.

It is my request thatpriority should begiven to all nearbyvillages for utilizationof the CSR fund.

PaEe 4 of 7

Sr.聞

Name and Address Replies by concernedProiect Proponent

Replies givenby concerned

officer3

4

5

Shri Saniaybhai Gohil,

Vill:Lakhigam,

Dist:Bharuch

There are around 35 to40 companies nearbymy village thoseCompanies refuses toprovide employmentto local people. Whilethis company hasprovided employmentto 5 people of ourvillage and hasemployed two people

Shri Suresh Parmar,Vice-President ofTaluka PanchayatVagra

Vill.: Kadodara,Dist.: Bharuch.

. Activity of thecompany related toemployment to localand CSR fund areappreciable.

Shri Naresh Gohil,Vill.: Lakhigam,

Dist.: Bharuch

With other cleaneroperations available,why the coal will beused as a fuel in thecaptive power plant?

Company should giveinformation aboutspread of the dustingdue to the company itsaffect on the health.

. Oetailed informationrelated to the samehas been provided

on the page no. 116of the EIA reportprepared by thecompany and thesame has been

uploaded on thewebsite. Norms ofthe CPCB for the use

of coal are verystrict. So company

electrostaticprecipitator. Lime

will be added to coalto control theemission of SO2 and

boiler of latesttechnology will beused. Detailedinformation ofdustings areprovided in EIA

report in table no.4.8. For monitoringof the emission,online stackmonitoring system

Page 5 of 7

Sr.“

Name and Address Point Represented andwritten submission

Replies by concernedProject Proponent

R€plies given

by concernedofficer

8

9

5r.No

Name and Address Point Represented andwritten submission

Replies by concernedProiect Proponent

Replies given

by concernedofficer

From where the coalwill be brought?

During the

transportation of thecoal in the closedtruck, coal falls on theroad and accident arecaused due to thesame.

Whether company willprovide medical

assistance if any

abovementionedaccident occurs? The

ambulance facility are

not made available tothe local people.

. Can company provideonline system tomonitoring dusting innearby villages?

. Why company is notestablishing powerplant which runs ondiesel or gas? Why coalis given priority?

ln other units ofMeghmani, there havebeen incidences of fireand accident in past,then why permissionshould be granted tothis company?

will be installed and

it will be linked toGPCB'S and CPCB'S

server.

Coal will be broughtfromcompany in the PVC

coated closed truck.

After Discussingwith the AdaniCompany about thisissue care will betaken to prevent theaccident.

lnsurance are takenby the respedivecompany for thesame and medicalassistant are giveunderinsurance.

such

. To sustain ininternational market,usage of coal is

important, alsoCPCB'S norms forusage of coal is verystringent and CPCB is

serious about itscompliance.

. No such incidencehas occurred in past

10 years. Themanagement andownership of allMeghmani group ofcompanies aredifferent, although

Page 6 of 7

Sr.

NoName and Address Point Represented and

written submissionReplies by concerned

Project ProponentReplies givenby concerned

officerthey bear similarnames,

Before the public hearing, total eight (8) written representations were received, in which (1)Annonymous of dated 13/02/2018, (2) Shri Dharmesh Mistry, Bharuch, (3) Shri yogesh p. pandya,

Managing Trustee, Safety, Health and Environment Association, (4) Shri Ajitsinh Raj, president,BhartiyaKishansangh, Vagra, (5) Shri Mahesh Pandya, PariyvaranM itra, Thaltej, Ahmedabad,(6)ShriJayeshbhaiShankarbhai Patel, Rander Road, Surat,(7) Shri pravin p. Seth, Chickoowadi, Ankleshwar,(8) ShriHashmukhVora, Amroli, Surat, then after during Public Hearing one more writtenrepresentation were received from (9) Shri RanjitsinhGohil, Vill.: Dahej,

Several letters welcoming the project are received prior to this public hearing from thefollowing villages: (1) Shri Pravin K. Patel, Sarpanch, Janiyadara Gram panchayat, (2) Smt.RamilabenArjunbhaiParmar, Sarpanch, Atali, (3) Smt. KamubenGohil, Sarpanch, Suva, (4) Shri t.C.Raj,Galenda Gram Panchayat, Galenda, (5) Smt. PalavibenParma r, Sarpanch, Akhod, (6) Shri J.D. parmar,

Sarpanch, Koliyad, (7) Shri S.R. Gohil, Sarpanch, Sambheti, (8) Smt. Kaliben R. padhiyar, Sarpanch,Paniyadra, (9) Shri Thakor H. Vasava, Sarpanch, Vav, (10) Shri Narendrasinh R. Gohil, Ex-sarpanch,Narnari, (11) Shri AjitbhaiChandubhaiVasava, Sarpanch, Padariya, (12) Shri Arvindsinhparmar,Sarpanch, Kadodara, (13) Shri Jagdishbhai H. Prajapati, Sarpanch, Jolva, (14) Sarpanchshri, LakhigamPanchayat (15) Sarpanchshri, Luvara Gram Panchayat.

ln addition to the above, various organizations have also given letters welcoming thecompany's expansion project and acknowledging information about the various CSR activities carriedout by the company, namely (1) Rotary Club of Bharuch, Narmada Nagri, (2) Ashmitavikash Kendra,(3) Dahej Eco-Friendly Society, (4) Hariom Solar Foundation and (5) Central South Salt Association,Dahej, were also received. These representations as Annexure Cl to C29 and their replies by theapplicant as Annexure D1 to D29 will be included as the part of the Minutes of Meeting.

Shri R. R. Vyas, Regional Officer, GPCB, Bharuch, summarized the proceedinBs and with thepermission of the Chairman, declared the public hearing as concluded.

M/s. Meghmani Finechem LtdPlot No. CH-1/CH-2, GIDC

Dahej, Taluka: Vagra,District: Bharuch.

07 /o3/2018

R. R. VyasRegional Officer, Bharuch and

representative ofGujarat Pollution Control Eoard

& Additional DistrictMagistrate, Bharuch

Page 7 of 7

Place:

aattt_41(■ %eta)

ct18 u・ttqtt εマRal■ 1町t Ctla ttttマ %8マ q[■ utaa■ atn Цa■tγ ctt《 uRan ttQt

uЩ qι■‐aQ γatq

utd ut8tマ Ctt q4 ua Ц■qマЧ ttatc・ ta,ct4 ιdott敏さtcttЦt 3■ 3:ユun tЦ33,d

t`/OC/200S uaaCtt Цdott tuttt3■ 3 aun 3010(6), Ctt Ot/tt/200ιat u電試Цa

ミu藪 ミЦЦ颯 3t64LЦ O■ sゝはマt(1)utqt ttt記 _stミЭttaこ ■ 132ミЭtta3 un(2)』 Ц

(Щqt ua■a■ ua)2ιO a■ュЦ■ 9.。 ■■■Ц ctt騰試マЧt Щを■ ttRa%ctt(頭紀)

LゝЭta t(■ )“4"■ 4qn acttac.tD eЩ ■ゝ ct■3■■tqtt d:00/o3/20■`Ott aγ

■.00

3CtttミudミЦЦ嗅 3t6■tЦ Q■じs■ ■9晃 utぴa t13 4-■ au―■/m.■■_t,υЩ。■■

6さ%,dt CttOttt,υ Q3Ц Щa acttm ЦR3 3a3at υn ЦR3 υtttミυte■,α3■ ■■.4.

qc.ttd uさCt4■Цttdtさ6帆 ttuCtt■ Щact

■ 42.4t tta,哄LQ3■03ta,■ %マtd ututt Raλ堅 ぬs,a3■ ■ttt a3

■■tq嗅■ 6Ц〔nd ia uq3t工 裁 6.‐6a.aaRLQt.■d■d anЦ ttЭtct10■ Цa Ct■3

■囃q咀 りR4■a ЩQd ut■ aЦQぬ`嗅

ttt 4 Ct13■ ■tqЧl■ ot●■ハ リQQ Щゝ aqtaQ

vel‐γεt ЦOtd Cttqa na ЦQdottt 3m anaさЩR3 1R3 Ctatct Цn■ 観さマЦqt‐■a

3ぞ qttt uact蹟さttd■a Цet ЦteR 4■ qЧm ana観さぞtd 3a t uct ttQι Qt■■

nactt6■咆utt uta3.utりa ctla%Щ ttcttqm■ ■o3ぞてutd 3■ ■8■,誠よ` Ca刺

nd ttttqd薇赳αGan an4マでЩd and■ 3a tt3ュ ea 3tactta nЦЦt uЦtatt 3Rctt■

utqミ ana製じd3■ L Щ n3、4qRl uRO,■ ottqtt εマЩta tγ aac.t cttCtaa utqa

c.tsa 3taaЦ■■Щatt 32Cttt 4Cta

赳マ哄te a)a Цaa颯4 ЦtCtt■00■ Ct13■ottq颯ぬ 哄'Q3■

ata、n■%ctt3tta

aЦ4、nd uRa%。 tt aミ uta3織ЩЦi ЩGRマて82ctt%興tact

ЦRユ%at3tマCtt uRaQ嗽マt3.■ Qミ■ЦtS■ ,ЧRa%ctt4 ЩRハ,Ccutea tta4

Цt2■,■cttЦ■Ott ЦЭtd,総■%くt4を348Q ЦteR,.■qttta qqtЩЦくЦЩQ a■ ■ua

m und aaa颯,cun dЩ utЦo3%CttqCta Цta4 3tЦЭQa■■■%tta ЩЩ■

)3ぬ Qt4 3マ Ctt■ ut可 .

娘 a%ctt駄マ.tt uRRQ ttttマ %utd Цは鉄4●ttε ЦЩatta tはt鋼 し,嘔ミ 4n3

■囃qtt Цqt ttt記4 aЦdt quttqt cttttct4■aЦ■qttt cttCta e■■ 3tCtttt da Щミ

3aa Щ K_tttt qtЦ d■ ■■201Ц 3d tt3ta actt utγ cttγ ctt 21 0■■4?マでЦta a■ a■ Щu

3aa t_ttttctt aCd■ ■a Ц4qマ堅・ ttqd4■■ 3マ CttЦi■lqa a■ 9■びmtでЦtd a・ a

ndti cttЦ υn OttЦ 41■Ц%堅t4マγutd 3ヽ a Rcttatt Цa ctla l en 21 0■■■ uЩ att

Page 1 of 10

aa ct』,an and、 マて.d3■ 2t3a ua 3Ц4■マtミュ創ndi γcttot uuCtt■ utqユ .

螺 ヽ_la3a■ aぴ 薇赳り3tt4■■ Oott a■。tt Bd■ ua ua ua Ц■qぞ尊,《ttt Цa

a%Э■■94 ct■ cttctaa t■Ot、 ctぴa dau na an aはЦ3マ ctt■ utqミ n dЩ tt aびЦ堅

り.aa a an tЩ a acttЦi ucta un dЩ マctt8 6uctt actc.t4283R■ ■■3CtCttЦt uCtミ .

dltCtte uttQ3 ЦQ3ta,ol%ttd u長、Чt aaaЧ ぬs ttttt ua■颯4ЦマcttCt01■ 1臥tR3

Цuua ct■ a4マlμta/4Щn/tun Щ≧■u■a13qt■ 4馘

ct13■ottqtt ε04く ot%マ Qさa Ctla`ttt in3Ц iマυ3tq■ _actりn/4Щ /ミun/■dqaЦγ utγetectl uRRQ ttttt uЦ qt■ 4ね り劇da 4a■%ct e:

utl eBgr rttlt"tl

n?1iqs{lqi {at{l dlArti ir,il"ft e3nta ut0.

uexa tfl{ i.}t1t i}t"ti.

tgai ugt tata{a6!i. ebqr uiutgongai cttui. ttIl4ltt?t Ct ruX rrt"[la.

tfl{ iuqr eo currlf, ro.r{eII r,tui. "} uet

il€sta 141,irl t oteet

lual qc,t Uot utatt?.

ミЦЦtt tum mtt6さ%■ ■■■Цtマ 3s

qЦtttt a Цtゝ ιЦ■4uRRQ uta46Cttiatヽおctt■■Ot

aaQ 3Ц■ ■o

cttu4 Цtt εさ%Э ttЦa

uatt■マctat4 utua

a Цtta a8マ 3■■■

■Цa ttミct e

reuRs als-Ii t-Irctt{l

r,{Uctt r{t}at iU"ftAl

uu."tl. i QretdlrltflQ luet I NrtRs

ctLsl. qqu .r{di .tfsfl

sl E fu,l.ai ucu.t

uftqt qurcrt{ r{4.

adi A.i.{l E. tqtRs

alsfi r-Iqrcufl

r,ttUcttHl S].d Oe A{ct

E{l crqfluGle

rr{Ne ?tq[,

(reriq)ctt{: tbif.

U. :0t?U

Page 2 of 10

0■

r1e1 rg srate"j

"ttr qiutatt

rSoua sla rlatrriliu"{lar u[iRQ art

r{uA( uqd?

nc,ifQa r*Ost{t

Cl.?t lrtUlaa

uqd?

t

d Et?r A uqr qtir

trui. d{cn{ r,tta..

e&cr ctt{+[ rlnJlr{t iuat.rcuQ utrl u[&iqqtr crutl E. A{udtr{t a[ gtu slautqfti iu"0 ul.arar

crq?trr qt} a alrladl{l a qctrqqr

ur) Eal. u{"j atRqt

qat$l usrq.

eta uqtfldl r,ri e&qr

el"snflua rlrtdhluatigsa fli qdr ai utg[l

i. ga, aurtrt u[ adru! I ut) aL ue{dl. s{r6t E.

ЦЦ猟■ avξttac.t し,

マてutd

3dミ

ttt44

3tЦЭQa aatet4 auttcS4Ц D.

3Ц■ ■ ■

■Щ しЩCt

ttuq 畿ぴユ

ι nd可mauЩマ35

0tt■Ctt

ctlttt Q緻堅

ua uュЦtら ctuttu.

,{l gurG[e

?rgl.r.,

cLl,{ : EE9t,

P. : Alrl

3■■ ユ Qcttat

ma..tt:s4Цョ

Цtを ■■2olu ttOttt a uta tta em

Ott■Ctt an■ %3■■d

護a■ 2t3ta

ut ottЦ Qa噂 ユλ ξυ

ЦOtd e aЦ% Щ

■■03 0Цtt aぴ

ut autマ■ 3ゝR3a

び決a“18 鮭a a Цtゝ

めsЦ』 りЦd ata a

Цtゝ4 utγ D

i.qir )s"{lsa Qlerqr

qr) iudl A slatstul' Q"s ajut{ aur

Page 3 of 10

1e1 ty stara"j

Atr+ rrtinaari

?Vr4td slcl tEtr,tliu"0d ufaRQ flrt

uurLa u,qar

noifQa r*Osr{l

art uurLauqd?

?

l,t"?r +e{As ctt-I }Suiaf As qcl B Iutlguo B aa

uQlaqt r,r.{li getur

aflctt-I a{l}"ttuJIfl}a uqt utQa D

I uarc"ftar E.

U.u6.fl.ril. 6t?t

crqti qr{l"t tlu{laracnrrl rrtQ E tti iqrr{la iu"{li qtucnul

r,td E lttliu.?4r6.Sl.r{1. d?geII Iatot rru.nrl utd. iurtqqtul r,ttqat arII.

i. r,uucrt fr00..

υЦt■ma nぴ a■'

鑢d dt uq Щa a

Ц≧■ 3tЦЭla 8マ4aЦγ 6ottttt■ Цt゛4aol octttqt Цじ4ЦOtC・tt a4 utaatt■ ■Цt6 a

aЦ% 6“ョぁ ■a

ottЦ4 utaCttaa■tOt倶 44 ■qtat

uttt Цa n■03qЦttttat Щ帆■

qctut 86 aa

3マ qta D油 《t4

otatqQ●■ 3Ц4こЦ

Page 4 of 10

iu"0ar u[iRQ artuurilcr u.Eaa

noiQa q0.a{lgtrr rlutLat

uqd?

1dl eg seatr"j

at{ r*ittt"uli

t!:r*ta slat {etrrl

3マ Ctta uЦa Ct uta

atactt uЦa .taatt■ υЩ。.n■

■tt e Щtt ЩЦqt■

uta e a sa屯 臥o敏破D_■a actt 3RQ

ct■■4 utuaa■32■Ot ata D‐Ott■

λqRЦi ut ua ctl■a

netua■uマ ct ttЦ

a Цtゝ Щ 電臥a u堅

cttnt ctc.tc・ ttctCtt Otu

nan e。uRanaЦtЧ

■ Ct3ttCtt

a買 3ヽa

■ 3Ц■■

■9縫 actec・t uetlぞ

ct{ ?ooo}t[ riu"0"j

iqseta et3 uaj crtee{l

atl i urcr gtII 3u"[l

A NuG.s alslil-Iqycufl {a. ixrRlri orad ud at{t}ar uar.al sla E.

iu"0Q ru-ottv"tiao cu{Lal etrtQtrt co

q*ali rlctcr.r{l

urQct E.

{ aqtuaotttl

cit&a

cU,H. : ttY,

P. : A}l

. qt:{8{Eft A1'quaa !,rruc{ttt Xt}

uzster{l aul.ctatltqatda B

irri Jt$tql

iltAq rttrqql sfla

. gu.[ rl t{lrtrttr,ra $si.r{qrr ratHcr s}a E

lrrqr lttlt"tl ruc]ctal.

ntD, xu[ti ru{"ft

r?flqtct 5ra dhluuut

$sa16uu1ct sfl{.. rd}tt?-I r,t Ulifa qcd

dI *rrfnr sla E ui Iu) {lQnr,u is stl

. iu"ft a Ec<tt rncr{rri {rl.ur,tt $s

qtQet aell. ctSct?ltl

r).suai iu"{l (t?t

ruu"j ua.u 6r.? ot"ttdl

l{tuqp{ r,ucreL igaB Eilet. r,t ut0

otld.ur u[ r{r{r?r

u[dqt+[l cutlr,rfi

颯 γ凛 籠ё

り4尊〔お ttぃ ,

OttЦ :6れ ,

υ.:α3■

Page 5 of 10

1al rg'sratr'!

"tt{ lrtintari

a3n*ta sla latr,il3q"0ct ufeRQ ctar

uulct u.gae

noi[0..t r,r[0sr{l

fl?r qqtact

uqd?

Y

%3■ ЩQ組

ミn4 油C・ttQ utu

c・tぴ Qta a.

fli. qtqaq1 i rr)"0

ctttjscttti"t ugt tuqct

E.

o lrttcLtr[l O,s q{Xl sgZ

uurql a olaAct i.enr

s?cu.{ uttctol.

utLctttt ot"ttctctt ltt)

iu"ft }acft rres s?il

ui nu gtllui. z

o (. .o? "tt ufss?t"t tl.?

Ectt uEett cJl"td.ce

ienr EtJ rn?r a.qt

uer@il g?crt *da.o lrtt u8totl IiCtI.e 9S

ulru{i uue G.etsrgt

c-il.cral.

. 6u"[ fl aqt [t,.tttu&at olsttuil LEIga

8 ? ctt Vctl. 6ctt etliui als{l Q d.n"[

"tt qt{I.

颯 ЦさこRξ

ЧЦOt熙

510α,

OttЦ :εさ%,

つ :Q3u

。■a■Щマ 3s Ц虚

ЦLγ―Ottυal CtЩ%。ttta ttcttCtd

utuqt■ 4a a4Цt■ 0直ハ D

a{I Uaqt"tqla, (utu 3.

uariu)ru{: Actqt,

U. :QQr{

r{rtt?t cUf"[ "tUSr,{,Qtt 3tt ell UO

iu"ftr,il r,ttaar E Iiu"ftl,rl tqtRs cils-Ii

frqui d{.n"[ at ut3

E te{r} l,tt iu"0 ai,tl{L?L Jtt{otl Uir{

ulstrr,tli i afs{t Ac{lQa E qi o{Itt <1

tsLsetul.i lllJlet {iugt rtr,at E.

r(I rlqraro{d

citRc-t

rtt{: Gtu{lrttlt,

P. : Otlrl

. su"{I A reuRs afs1"0

r-Icrcufl ut) i.urdlilur,ue $s ltt)

a[ q]er uaute,

c(.. ria{tara

atcrtt 6uu5u

Page 6 of 10

rjel ay srare"j

atr r*i.+taat{

rSoua sla 5atu1iq"0ar UIARO flrt

uuttra uqar

{r,i[ua 4[0sr{6t?t rr{Utae

Uqct?

tt

5́

0

`

Jttr{:sS'IE?t

9. : A3rr

sletL sL{]. uriu.0?r B.

ιЦ4 aぴ utぴa ntea靴マ3、ct D●■ ■ott

a tts ut ut■■■

RЧd ЦtS■ utac.tD

aЦ% a actaぴe u?

■ЦCt15 3` C・t e ctЧ■

acta cttЦマctt Цt≧

■■■4 ctt attu Ц興

358 0 0 Цtと 3Ц■

ぴan oa3)■■を3マ

C・tOttqれ,so2 4 6融式

a aand 5QqtユQЩ

utユ 、at a CミQqti

■tcta aЦ% Цctcta

b3anυ qttttぬぴc.ta

n cunЭt 8ぞ qtЦi

utqミ sJЭ t a■■

Ootdqtマ ЩQハ ぴutぴユ

aQ84ゝ哄ct 4 Y`■

ula E. 6uala 6ct{al{.uc{, :{t} rril"tatd"t

€s :L"[a{lcr Rrau

l5c{r}r[ utctil *au{tt{lo{t lrrqr {lrltdlr,0

ar ttdr ut0. c{ls Erqtxi

lrtl.ctil.

. g-Ianl. aus"[ r,retgll

iq"[ A eII ,{I.{ldt

sldlct stcn o,iU ?g-I :{i

atctcnul r,ttcril.

ぃact utcttt lat配

Цtと 鮭帆dЧ d■LuCtЧ Щヽ ●tnd堅・tt

a3(. acttじ ctt

aQuta%6ЦaOt lЦ

3t qt■ Цtqユ ?

3Ц4■こⅦ Itttt at

aa teq saot aa

aЦ%a44Qさqta

al■ 32■Ot aa a4

Цttd utucttЦ i ua?

glaul r.ttPII atqqtrll{tctt'l?

a{l a}er citGa,

rr.r.{r ctuftrtt]t

!. : Atl?l

Page 7 of 10

5el ?! s?"tt?"i

otFt uanrati

rgora stet 1atu13,{"{l+r u{aHfa grer

uutLct u(gar

u<,i[0a uQrt{l6r?r.{uacr

uqd?

C

ЦЦ量颯ユ

γqtact t,

ut ult

4amQOLa a63Ц4anc.tu4t

■tRct●・ta

dQЩaactt

un cは 4

ЩЦ aЦγ

u3Щ d ct

uttu a

Ц●■

dιεta

tЩ4.

l{t qrora uErqft tq"{l

f,3 qqt gfli rlsrr{ta

"t nglq i ut)"ft alet{l?ru{tSi.

ut Цゝe a tdl tttマ t

uctOt■ 6c証ミ漁

acttЦi 4qa aa D,a

■6_a u3猟ld uttЦ

a 6凛 1ヽべ ■dold

ミR3ct uota Цa

こЦ I■■

octt uacteSot

eさdt4 ac・ta

dQ■ 3utd

fr sl.U l,{tql ustrtl.d

tt%l?r. aL iu"[ lCssct

uot?r r,rtuel.z 3u"[a.

tqr) !.roa1a.u ut)

riq5 stqtul r,{ta, E

erl iu"0 6t.?t

rlx,qa"u ilcnrrtl

Guaou srqtul ]uqdl

aeII.

s+llct u) iu"[l,tl.ttUl.ltott cUULUl

Gctda"[t r,ilaauJa

urqqft ut]a utual

{l u}z

Page 8 of 10

3q"{I4t ufaR0 arrt

uurtrct uqae

troiQa u[ist{lgttt r,rqtLa

uqd?

5e1 rg atatr"j

"ttq rlanrati

eEur.t sla 5atoil

eu {re iu"0 Brle }ofn +iqt(aa qtq?

rat"e aell or"tt.rdlz

s'Ieturi urE(Lsat e[qLlz

lq:{(Q quotr. r,t"e{

gaalui .&)3dtt

tlastotui r,ttJr.

Atctctl.otl. dPl.L

l48t{tctatt otAtql.

q"rrt E al. eu. rtl utt

iu"0i riqfl uudlz

an3 0t望マ■ 3■ tさ qt

Ц≧ actua 6Ц aЭ t

%3a D, a.% aQatat

cunot Цtと n■■4at

a赳 Цttt 3S3 0 aЦ%

aat utcta Цtを ■■■4Цヽ 。iOnt e

tu4Ц i 3cc・tt ea qミ ■

4a n6 otottq Cta

ct』 ct■ , ミЦЦqQ

認Ц4 3Ц■■ uctot

uc・tot ミa%ヽ記 uaЩQ■ uttaじ,■3al

atЦ n3 uぞ屯 aaじ di

3u4at uma■ ctot

uctot Э[堅ta

ct13■■tq嗅 ■Ott6 ξct u6(`)andぞυЦta Цact e e■ (1)■ ultt R』 ,α3■ (2)

Ц■■マヽЩd,dt t3/OR/tOヽ`ぴ

―ミぴc・t ttttt ЦaC・t(3)■ ■aQt■ ■釧 ,ミattot tta,ミ 3a,

さct aatuaミ記 anQattot(`)■ ■υdRξ tt%,り ]Ц Qtマ da BQttct tttt,(■ )颯 γattは6

2132は6蛯Ct,tttt as,、マd,(9)■ unЧαt6■.ミ5,島 qt■,■3attt,(0)颯 ЦさQt us■ ,

■■qマ尊R■,aQa%,ЦЦetctte,(`)m ou■Ц att,.Цad、マd

ctl到・ttqtt uЭ LC and■ 41%qa γ臥_va ott i』 :Ц4■l Qatq■ett a

Цtq3ta40tl Цa u。 3tマ ЩЦd un ЦaC_tet ttЦ≧ct uaRt t _.マ Ц.,vttatett o■Ц

uutad,2■Ц組 ?颯ctta崚 将 ■mぴ ut Цtt― ■マtu,■3td OttЦ uЩЦd,3 ■Ц■ 3■a■

otqudQtぴ cnRct_■tuu,、 ctt ottЦ ЦЦtact,v ttn t4ぴ m et%_uぞ tu,Ota^t ottЦ u■ad,

Ч■Цa tc.c.t4aく 0■マЦマЦマーattu,■■8 0ttЦ ■atad,9■ 9 ■ ЦマЦtt ― ■2■■,

M48 0ttЦ ■ЩЦct,0 ■ au Цtマ 51oc‐t― ■マ嗅Ц,護aa ua祖■dQぞ 。ttЦ uutad,`.

■Ц■ 3tnaOt utt udatマ ーuマu■,Ц颯48tt OttЦ uutad,こ 颯 6taマ ユЦ quqt― ■ぞЦЦ,

CttCt OttЦ u■tuct,lo■ mBct a、こR・ Цtt._3 attu,cttЧ t4 ottЦ ■utad,tt.■ ctutctt

uυ dQtぴ ミモЩぴ―■tu■,Щ8aat ottЦ uutad,te muマ R6■ utЦtt_■ttЦ,3■6tt O■Ц

■Цtad,■ 3 颯 %ЭtattQt6 a■ uttЦR_utuЦ ,actqt OttЦ u■tad,tv uマ u■ 颯,qqtet ottЦ

tutud,lЦ utuЦ ttn,ctョlottЦ ottЦ uutact

Page 9 of 10

5e1 ry se+rr"j

"ux r*iur<ri

rSora sla larr,triq"{Iat ufaRf{ nrt

uurlet urqae

{4[Qa r*Ost{l

attr uurlatU(E.t?

r,{. 6u?[cr Vdt-Vdt {urr,il arte{i iu"flai fQr.tagt u]*sa i r.,nqstral a{ rtee iu"06r.?r. csR !s ar orct 3Q u.enr qtII srarul urtdct (dQq uq.ftur]"0 mql s?cr. qe] ude E *uit. e&r tlsl $sa0 illuradl, Jl$r+er licr\"? il."er, a. a-Iafl sctq r,il$ ct3q arlet act{I, s.

urd{lar lastu ]"r,, x. il"ict mGpr {ir?r.cr ttle l"g}sat{ Qetrt{lrtrer"t.

il{er afs qar.rgfl E?re{tor r.{a?r {s (rt r{l vl"q[ile ufiqtHe ?tq[, ru]t , e&r argell

tIr,ua uda D. ut rl(r,uali iliaa r{l-r eII {l-ea ui t"ti uttgrtri. rliett fl-t tII $l-ec

a{l} gtd.ndl alu{ ttl{ta.u st.u}{[ r,ttqe].

iar{ r0. r4r?. r,n?. "anu, urEGIs r,rfisrfl, oj. u. R. a1S, oqu flet st{{6["t]' tttriu rg s{l

r,raaat"0 utqtac[l ao r,il.au? +to alsuatqqll rlql Eilet qnBa saqtxl uta.a.

lrtL?. Ul.?. caltil

uttGls q[Ust{l,equ uiclmra uquqL fieiaqt

qlS"ti u[iR0

fi,qtdl r,t[0s sd.sar l,tiu[0.s uccu luQar0, otlu

urrn: Lud lq{q0 gtoa}x fa. "flullse rutJa,

r*ila 'i - dl.{q.-td[.t{-a,U.r,tt6.gl.i{I. eBY, at. q.tctat,

u. 0t3q

atflrrt , oolosltotc

Page 10 of 10

Gujarat Pollution Control Board Regional Office, Bharuch

C-1, 119/3, GIDC, Phase-2, Narmadanagar, Bharuch-392015

Website: www.gpcb.gov.in

Annexure – C

A statement showing response and comments received in written format from others concerned persons in

the Environment aspects for M/s. Meghmani Finechem Limited through Expansion in Power Plant

Capacity from 65 MW to 132 MW before Public Hearing held on 07.03.2018 at 11:00 AM at Project Site,

at Plot No. CH-1/CH-2, GIDC Dahej, Taluka: Vagra, District: Bharuch, Gujarat as per the Ministry of

Environment and Forests, Government of India, New Delhi vide its notification no. S.O. 1533 dated

14/09/2006.

Sr. No

Comments received in writing from Concerned Persons Annexure

1 Query by [email protected] via Email dated 13.02.2018 C-1

2 Mr. Dharmesh Mistry, Bharuch by Letter Dated: 26.02.2018 C-2

3 Mr. Yogesh Pandya, Bharuch by Letter Dated: 01.03.2018 C-3

4 Mr. Ajitsinh B. Raj, Bhartiya Kisan Sangh by Letter Dated: 03.03.2018 C-4

5 Mr. Mahesh Pandya, Paryavaran Mitra, Ahmedabad by Letter Dated: 03.03.2018 C-5

6 Mr. Jayeshbhai Shankarbhai Patel via Email dated 05.03.2018 C-6

7 Mr. P.P. Sheth via Email dated 05.03.2018 C-7

8 Mr. Hasmukh Vohra via E-mail dated 06.03.2018 C-8

9 Mr. Ranjit Gohil via Letter provided during Public Hearing Proceeding dated 07.03.2018 C-9

10

to 24

Letters (positive response/welcome letters) from 16 Villages namely:

Sr. No. Name of Village Date of Letter

1 Janiyadara 14.02.2018

2 Atali 12.02.2018

3 Suva 10.02.2018

4 Galenda 09.02.2018

5 Akhod 09.02.2018

6 Koliyad 08.02.2018

7 Sambethi & Samatpor 09.02.2018

8 Paniyadara 09.02.2018

9 Vav 09.02.2018

10 Narnavi 09.02.2018

11 Padariya 09.02.2018

12 Kadodara 01.02.2018

13 Jolwa 15.02.2018

14 Lakhigam 16.02.2018

15 Luwara 16.02.2018

C-10 to

C-24

25

to 29

Other Positive responses were received from other 5 organizations:

Sr. No. Name of Organization Date of Letter

1 Rotary Club of Bharuch Narmada Nagri 05.03.2018

2 Asmita Vikas Kendra 05.03.2018

3 Dahej Eco-Friendly Society 05.03.2018

4 Hariom Solar Foundation 05.03.2018

5 Central South Gujarat Salt Manufacturer Association 05.03.2018

C-25 to C-29

From: xyz xyz <[email protected]> Sent: Tuesday, February 13, 2018 12:34 PM To: gpcb-bha; [email protected] Subject: Non complaince of EIA Notification -Meghmani Finechem Limited Dahej.

પ્રાદેશિક અશિકારી અન ે

લોકસુનાવણીના સભ્ય સશિવ

ભરૂિ

સાહબેશ્રી

મેઘમની ફાઈનકેમ શલશમટેડ દહજે એ પોતાના હાલના પલાાંટમાાં પાવરપલાાંટના શવસ્તરણ માટ ેઈ.સી

મેળવવા અરજી કરેલ છે. અને તેમાટે લોકસુનાવની રાખેલ છે.વિુમાાંઆ કાંપની એ હાલની જગ્યામાાં

જ હાલના કઓશસ્ટક પલાાંટ અને નવા જાંતુનાિક રસાયણો બનાવવા માટે દદલ્હી અને ગુજરાત

ખાતે બીજી અરજીઓ કરલે છે અન ેતે પડતર છે.આ અરજીઓનો કોઈ જ ઉલ્લખે હાલના EIA

દરપોટટ માાં કરવામાાં આવલે નથી. માત્ર પાવરપલાન્ટ નો લોડ બતાવીન ેસાિો લોડ છુપાવવા પ્રયાસ

કરેલ છે. લોકોન ેઅન ેકમીટીઓને બેવકૂફ અન ેવિારાના લોડની ખબર ના પડ ેતે માટે હાલના EIA

દરપોટટમાાં માશહતી આપલે નથી.આ કાંપનીની તમામ અરજીઓ MOEF ની વેબ્સાઈટ પર ઉપલબ્િ

છે. આ બાબતેને ધ્યાનમાાં રાખીને તાત્કાશલક પગલાાં લેવા શવનાંતી છે. Earlier criminal case was also file by GPCB for violation of EIA Notification which is also not metioned in present EIA Report.

આભાર

Annexure C - 1

Annexure C1 – (English Translation)

From, Xyz xyz

[email protected] Via Email dated Feb. 13, 2018. Subject: Non complaince of EIA Notification -Meghmani Finechem Limited Dahej. Regional Officer and Member Secretary for Public Hearing, Bharuch Dear Sir, Meghmani Finechem Limited, Dahej has applied for EC for Expansion of their Power Plant within their existing plant. And public hearing is being conducted for the said project. Company has also applied for expansion in caustic plant and agro products for the same plot at Delhi and Gujarat, which is in process. Current EIA report does not mention about these application. They are trying to hide actual load by showing load of only power plant. Public and Committee are kept in dark by not showing the additional load in the EIA report. All the applications are available on MoEF’s website. Request you to take immediate actions regarding this issue. Earlier criminal case was also file by GPCB for violation of EIA Notification which is also not metioned in present EIA Report. Regards,

cfr*,

iE{tdtat'

XwrnrqrurFzirud-d

rrift{rrr

sifuq{

Xv-aorryrGzi:uold

q[qt

qf{rfirdd+ i. q x, q{i. I ? Y o, c+qro}qd+€,

qTeTqR$-+fr+ffi,q5q1q]: tsq,zs"sqrq

fr4ls;(t-o1-1oq,a

G. p. s" Efl,eRm

(1)

idw : ffi q.r€r *q (fr, fuffir - sniq) a1 qrrifiufrq

(2)

(3)

(4)

(5)

(6)

8il6 V{qr$ a1 fr+.r-ffir

"ek

4tq'rl q-qEss *1 ect-t\RgEr *1 rrq t *g_€ ffi gq Functionat Area Exped *'am

oerT e€ri +tr-*tr t sRqr b ffi +rq fuqr t 3q-+1qr+Tfr nqr Bsml qqq qqt-qr op{

r+h qE * s-fr +{ dq & sp{ dq e)q. fr. e}q. q Ai il kqfr-ifrr

d;qfr {;r€ee * Qct-Nnerr * firn t s}tr€ M g( Functionat Area Expert *r{fra-arqr e{Fr+rfr t f+ l€. rs+1qm+rff l

ziqfr m;q'-cT€ * QcI-NABET & nrr t oig< ff,+ g( Functionat Area Expert * o16r tff,s ga €r fr s-{h 3fu 5.qer€ & ot< gq s-{R ft1 l-+e eh.. oti. o}q. t di & teq ffi r

d;q-fr s-q€€ * QCI-NABET fr aw * elg€ ffi g( Functionat Area Expert fr eEr tFds d fr s{+1TqM-q dn S-{sri + i.otTi.3i. n$d + fdS stq-+tc s1rffi316fuq mrq-q f{q t 3fu qrq-fu-qr t sr+1qr++rt r

ti,cfr {.ssrd & ecI-NABET + nw t eig< ffi g( Functionat Area Expert fr ot{t tfdse' fr s{*1ffi ds gfii q en{ t ss+1qrrfiftr

6{r€€ q1qqffiq d-{ s_{qd s#r qs ntq-€ + qlt q a1ffi qrfr t sv+i

qrflt r

).6\"2e-2-/, tt

Annexure C- 2

(7)

(8)

(2)

.irqfi i 6{ar{ d qs q}-+€ * fdq f*-flfi ds g'dr€ t Bs*i qrrmrfi opn .iq* ertr

6{s.{ & Ets M Sq flR *1 n+s slq. st. e}q. n- {s} e1 ffi r

drqr1il 6{e€ i {.BtT{.ei. fu}-J & ois{ + e}qt-d ACCREDITATIoN cERTtFtcATE

*1ara tt q- orTA t r q) sne +1nrnu fr qrq d d ur+1aflq-d qn d Ed +1ft.n snccTql

o{frffiTfr dRl e-S ofu ec s{h o}q. 3ti. e)q. t ti +1 frtfr r

NABET-ecrqFfflr slkr dml$hn qfiFn+z elq.oi.elq. fr t+ri.qTt.e\. filtJ or HsTq s{ffi qfr qr ilr, cq nqr sslr +r ilr{, qdr, dqfr fir eir$-

S qn nq wqr sr*rfr "td

d. W +i At{ sTfr +1 r+e e}q. ei. s}q. q {ui s1

ffirq-{€€ i +{-+{ S zirqri + fds Sr€ i.G{ri.ei. Ft'd q-{r{ t se.irffi +r clq o+(

eFlfltr (dr.o1-ot-ioll Q61. 1o-o\s-Qo{\s ncF)

(12) zircrl + er< gFe dr n\ gq{ro qvoi r+iew drd *l nrq t kn Eq ffig q}trq ruT drrs "is*{i +1r}trs oiq.ei.e}q. fr {ut +1fri5,

(13) gq{Tn {rq } qrE{.iq-fr fi +1{ S gn * d w +1 rqwr Fziew dr-d qrcr qft fti..r$ ffiflr)frs ne{r drrfr d-q s{i +1 +Es { g+r ?r a B{+1r?rm o}q.en.olq. t uqn s{i +1

ffir(1 4) s LEAc s1 n{F t dq4 6 qq * ToR 6r comp tiance s1 E+tsn r oo qftffi siq t ql {g

ss+1qn-mn1{ qqr

(1 b) oc r-Nneer +1 ffi-qT€i fd-ilfr dq gfi{ d t 3v+1 rsts f cr+fr I }r Bq{ qfi-+q q-{tiiq.3]} elq. i {ci qfi ffi |

(1 6) QCI-NABET fl frqqEql{ s-q-€E i ftri .d ETE{ + ffi Functionat Area Expert i g+qq q{qm ffi rrn Fd-J fr nq k=o & vfr (wrqr) or v+i t ss+1ErTil e-di +1 ffi |

(17) e+re lfi a+. ffi qqr frA t qr e,nt t s{+1 ffl( r qsi fi tdS lrq1 sti t fdqT rqT sq-+1

l+ro r qrfr qR +qr Go{r fucr .rqr t tr fr-f, elq.eti.e}q. fr d-+ r ger{ ffi gq est Bl fsF-eo

fiAnTfl€ * erq drrr

(18) sLEAC +1om t:+;q+ a Ri gt ron $r compriance *t e+t+-o 100 cR{rd qq Ei frss+1fqrf, rqn +tt

(19) sLEAC +1orq t drffi q} Ri g< ron sr compriance q1Eftt+-( roo qfuqm s-q d a]

ss-+t gfu Eirc+ fufu-d fr u-qo mt r

(20) fr<gvs il Tq, Tdr $q.et.oiq. i d+r(21) 4rqc1{F di h erq a,fr sftnrH'il =nq ero{ i-a il sw csRf( +.ri fr ent cplr es ckfln

emr+ ffi+11M ti fr elrir

(e)

(10)

(11)

(3)

(22) qs fr-+€ at 3idrtd or{trtrRI frRR + elirc{I qrd{ il dli oen ffi & s{,qTfr + drffiorirgnf, t ffi fi n.FR sr g+m t'm n) drffi +1 mqu,l qtfr +sT fr,EmqT ffi +rrq s} s-q€ fsqT A +{ dilrfr qT dqfr + fu{} ffifi qFmTfi sT q}iffiqr B)q.3i.$q. fr

rqn etr(23) rircfr + er< gfu fr cpcB +1ilq. t 4qfr iis s1i +1+Es tt fr qT{ A fr.ircri i 1Hs

*-S qq fdcT Bq+1 qmfl-fr I ap.r ffifi clR 6G S ff,s i{ rg $fi sffi * srTq (?lr

erui-{ o}q.Bt).o}q. q {ui +1 frifr r arrt m+rfi <wr fr qt ..Ts H$tc a{qc{r Es +1 r*-qsl {Rtq qi {+E olq.st.e}q. fr roi qt fuifr I

(24) ft-{r€€ i oct-Nnerr * e}*tr'svm sfiFn'*z lwnorrx) cTi + fe.S *1 rr{ 3trq efu en-q

* vrv aqn H rA *rut€ qi rznd (mrfr) elq.S.otq. fr {si +1ffir(2s) i.e{d.e}. dctJ sT iECcH s{iqrA qftt i{q ffifrs, qfri o'n q{ fr furT & eiv ga

B{-+1slfi wr+ri}r

(26) cqffiq et.{ V{drf fr n*tT Es'n}-+€ fr i.etr{.ii. rlqtj or tH{Tr ft-{ffi qfr +1

HEAffi il Aq-q fr srti fr,ro q-dri +1E.inlt

(27) er{r.trkr kRR + gffi ffi dFr oiM qnr il qrrrr t Bvft1qr-sffi I

(28) oRr.trRT f{ffR + oTeFr ercrq rfs e 5_drd6 ga ed qtr+Tfi oiq.3ti.s}q. t {qi s1

frifrr(2s) eRKtrkI ERR + d,t +l ltqrFm flqsrf, ffi t q] erorr-erc.r rris t TdTfrm emsRl r

(30) fs nt+€ fr eiflt( 3firtrkr fr-RR + effi +l npn drqql + sffiet qi iirffi er*g-ro tt6S sfi czER sT gm<n rS tn tsr qR" driq-{qr iH + qtu iircfr orrqT .irqfi +ffiqR qfrrfir0 +r eli?ffirT nq.3ii.slq. fr ego mG +1ftifir

(31) w q]-+€ + sid'in. er{rtrkr rdw.R + qrTrqr qre{ & ff nqr drq+ + sffif il 4n-fr

ercrsrkT t ffi S !.ffi fi 3+w rfr dmT tsT q}riElrTqr i-e.fr * s.M e) {qF Fmqr d oi{drrfr qr drqfr + fu{t iqr+sr eTRrflt sr q}'ierflqr s}q.ei.slq. fr nq( str

(32) Es.fi-+€ t orvcrw eRR + ffi +1<rn tiqfr + {ffi +1 .i[fr s]ctrsnf, t ffi E1

qihR Fr Ss-sr{G3{r fr q-.qm'{€q1Fffie-{fr t qr +s usat ufr qr;r+Tfr uqds{i +1

ffir(33) enq +me €dq-o Fffiffia fr er +rd *-{ffi t ?

(34) elrr+T Rrd m $"ft q<$q-d M mnq fr qr.q +-cqrqr tz(35) .iqfr effilqrd } qqq sr qr-scrc S .fE + mni qr et< sr<rrq.m frir qr dqr f++roffi t ?

(30) orsqrs il fi{ & ffi ft1gWe EqrflS & a6 qo, firqT t sqh qR fr +S qT{f,rfr

rffit?

(4)

(37) Eiqfr {qsd Es ct+€ * E.ari.e}. fltd q-rTi t srw +t{ .rf,fi qfi d fr Bsil €Tqi

fme v.ner.s ri qT-+-fr t qr +82

(38) q;qfr +-'qer€i Ee q]-+€ & g.ed.oi. d+j q-{ri fr enr *ti rrf,fr s1A d sst sTq}yds ffiqrE 6 qrsni t d Bv*1qn"+rfr o-oq eilr qrqEr h giletfi qTilmrfi t r

(3e) qs !t+€ + oiilfd or{frtrkr ts-ffiR + ffi +l rur qrffi + sffiofr dr d[fi 3ffi-srd tfus fr n.ER 6r go-vm *.n d dtq-fi +1 ffi q+,fr aRT $ra d,iffiqr +es il a-rqziqfi e?rqr drcfi * ffiqr{ o{Frsi0 sT frri*.flqr stq.sn.eh. fr ryo q€ +1B.ffir

fla : u-6raaaru-qmffi wwfi titfuqfuifi r

crS{T Fr*fr

e*qfi6,sfr

Annexure C2 – (English Translation)

Dharmesh Mistry Block No. 14, House No. 1340, Narmada Apartment,

Near Mamlatdar Office, Bharuch.

Mo: 9998609995

Date: 26-02-2018

To,

Member Secretary,

Gujarat Pollution Control Board, Gandhinagar.

Regional Officer

Gujarat Pollution Control Board,

Bharuch.

Subject: Comments/Statements regarding the Public Hearing of M/s. Meghmani Finechem Limited, Dahej (Dist – Bharuch).

1) This is a request to include the names of the Functional Area Expert approved by QCI-NABET, area in

which they have worked, the timeline along with their Sign and Stamps with the MOM.

2) The information whether Functional Area Expert of the consultant approved by QCI-NABET are Salaried Employees or not?

3) This is a request to include the copy of agreement letter between consultant and the Empanelled

Functional Area Expert which are approved by QCI-NABET with the MOM.

4) In which other companies are the Functional Area Expert has signed for the Public hearing of EIA

Report?

5) Information regarding payment of fees for the Empanelled Functional Area Expert approved by QCI-NABET.

6) Please provide information regarding the responsibility of Consultant related to Public Hearing and the

Project.

7) Information regarding the payment given by Company to consultant for this Project and request to

include the copy of agreement letter between Company and Consultant with the MOM?

8) Include NABET approved Accreditation Certificate with the signature and stamp of the authorized person with MoM.

9) Include NABET approved Accreditation Certificate with the MOM.

10) Request to include the Xerox copy of Person’s Name, Designation, ID Proof of the company and Government ID Proof who is doing presentation of EIA Report.

11) Kindly include the details of those companies for which the consultant has made the EIA Reports.

(Date: 01.01.2013 to Date: 30.07.2017)

12) If any show cause notice given by Gujarat Pollution Control Board to the other units of the company, kindly include that with the MOM.

13) If any other unit of the company is located outside the Gujarat, and any show cause notice is given by

Gujarat Pollution Control Board to that unit of the company, then include that copy with the MOM.

14) Whether the ToR compliance of ToR given by SEAC is 100% correct

15) This is a request to include the receipt of payments done by consultant to QCI-NABET.

16) According to the rules of the QCI-NABET, in how many EIA Reports does Empanelled Functional Area

Expert taken by consultant can write their names and sign? Include the details.

17) Information regarding how many trees has been planted till date. Details of source of water. If water has been purchased then include the bill of the same in the Minutes of meeting and digital

photographs of trees planted.

18) Whether the ToR compliance of ToR given by SEAC is 100% correct. Provide the details.

19) Whether the ToR compliance of ToR given by SEAC is 100% correct than company should certify in

written.

20) Include the name & address of Land losers with the MOM.

21) After commencement of the company name of the employees should be written outside the gate and request to provide 85% employment to local people.

22) By this project apart from the affected area and employees and workers of company, if other people and employees meet any accident due to company’s activity then it is the responsibility of company. If

such guarantee along with the notary is given then include with the MOM also.

23) If any closer notice given by Gujarat Pollution Control Board to the other units of the company, than how company acquired the revoke? Also attach all the documents submitted to for revoke. Kindly

include that with the MOM

24) Include the copy of documents submitted by Consultant to get the QCI-NABET Certificate with the

MOM.

25) Information of that person’s joining date, month and year who is doing EIA Presentation.

26) What are the responsibility of that person in Public Hearing and the presentation he is doing of EIA Report?

27) Information about how many affected persons are having knowledge of English language.

28) Total household information of the different villages of the affected area.

29) What is the educational qualification of the people of the affected area? Give the information for different villages.

30) By this project, affected area people and employees and workers of company will not be affected by

any accident in the company. If such guarantee along with the notary is given then include with the MOM also.

31) By this project, affected area people and employees and workers of company will not be affected by

any accident in the company. If such guarantee along with the notary is given then include with the

MOM also.

32) By this project, all the employees and workers of the company will not get affected by pollution and sudden hazards and accidents and any other gas leakage, then whether there is any responsibility of

consultant regarding these issues or not? Provide the information.

33) What are the activities you are performing in Corporate Social Responsibility?

34) Whether the drawing of plant has been approved by Industrial Safety department?

35) Whether the company is providing insurance to the affected person due to any sudden accidents?

36) How you are going to train the people of nearby villages regarding the offsite emergency?

37) If the consultant has done any mistakes in making the EIA Report, then whether police case occur or

not?

38) Whether there will any police case occur if the consultant has done mistakes in EIA Report? Then kindly provide the information in written statement under which section case can be done.

39) By this project apart from the affected area and employees and workers of company, if other people and employees meet any accident due to company’s activity then it is the responsibility of company. If

such guarantee along with the notary is given then include with the MOM also.

Request you to reply the letter in Hindi Language

Dharmesh Mistry

Undersigned

SAFETYHEALTH ANDENVIRONMENT ASSOCIATION

208, Vadilo nu Ghar Shopping Complex

Kasak, Bharuch - 392002

E-mail - voqeshpandya55@r'ahoo.com

Contact - (M) +919825032079

Registration No :1) F/61s/Bharuch uirder the Public Trust Act, 1950

2) Guj. /626lBharuch under the Societies Registration Act, 1860

Donation u/s 80.G. of the Income Tax Act. 1961

Date- 01/03/2018The Chairman,Environment Public Hearing Committee, &The District Collector.Bharuch.

Subject- Environment public hearing of M/s Meghmani Finechem Limited,Dahej

Dear Sir,

We most humbly & respectfully submit our Questions/Suggestions. Kindlyregister the same in the minutes of the meeting and oblige.

1- Please give ihe Safety Penorrnance track record of MeghmaniFinechem Limited, Dahej for last 3 years. i.e. how manyaccidenUincident took place? Severity rate, Frequency rate, Accidentanalysis system & remedial measures taken?

2. Which type of occupational disease is possible in such type ofChemical Industry? How many Occupational Diseases reported atMeghmani Finechem Limited, Dahej till the date?

3. How many persons are trained in First Aid in each shift? Facilities ofambulance room with qualified doctor and antidotes available?

4. Has company provided any mobile dispensary and ambulance van fornear by villages?

5. What is the total strength of manpower (including Managerial stafO atpresent? What will be the additional strength after the expansion?Please give us % of local employment.

6. What is the Environment Track Record of - Meghmani FinechemLimited, Dahej? How many times MoEF or DoEF or GPCB issuedthem Show Cause Notice /closer order for non-compliance of theNorms for last three years?

7- ls there any case/legal proceedings are pending for the violation ofenvironment issues at any court of law in lndia

..i. tr" C. B$ARD \BHARUCH \r\,, -

r\s[,t:Ixfrffi l\\'\ a)-,v/

Annexure C-3

SAFETYHEALTH ANDENVIRONMENT ASSOCIATION

208, Vadilo nu Ghar Shopping Complex

Kasak, Bharuch - 392002

E-mail - [email protected]

Contact - (M) +919825032079

Registration No :1) F/615/Bharuch under the Putrlic Trust Act, 19502) Guj. l626lBharuch under the Societies Registration Act, 1860

Donation u/s 80.G. ofthe Income Tax Act. 1961

8. How many onsite emergency plan rehearsal has been done since last2 yearc? And any offsite emergency plan rehearsal carried out in yourpremises in presence of govt. authorities?

9. Looking to the present siie and potential hazard of the company wehereby strongly recommend lo have two ambulance van and one ful!fledge fire fighter with all necessary equipment.

10. The project proponent are requested to highlight the fly ashmanagement i.e. present data of fly ash generation and itsconsumption as well as the proposed generation of fly ash and itssafe disposal-

11. Whether the design of ESP will satisfy all needs after the expansion.

12.What will be the additional generation of CO, CO2, SOX, and NOX inenvironment and the controlling parameters by M/s. MeghmaniFinechem Limited, Dahej.

l3.Looking to the present potential of hazardous materials and after theexpansion of coal based power plant what is the total green belt areaas on the day and what will be the future action along with the budgetin coming years.

14. Dahej is situated at seashore and there are many possibilities ofnatural disasters like cyclone, earthquake etc. we stronglyrecommend the siructural engineering/ construction should be sustainto all such situations.

15. M/s. Meghmani Finechem Limited., Dahej should hightight the CSRactivities which they have carried out in last three years.

Thanking you & with best regards.

For, Safety Health & Environment Association,

yosey'h e.TFbndya

[-

--,-= /-----.-----+ ---_-__:>qf J>, a

Managing

<^ .l

\

r

I

\\v

I

4{-"-^*'--

tl s-Dtt [Do s-qeq ttAnnexure C-4

Annexure C4 – (English Translation)

Bhartiya Kisan Sangh,

Vagra Taluka, At & PO: Vahiyal, Taluka Vagra, Dist. Bharuch, Gujarat,

M-9879359151

Date: 03-03-2018

To, Regional Officer

Gujarat Pollution Control Board,

Bharuch.

Subject: Comments/Statements regarding the Public Hearing of M/s. Meghmani Finechem Limited.

1) The Show cause/Closer notice given by GPCB to be taken in to MOM.

2) Safety related all notice to be taken in to MOM.

3) Certificate of Consultant is valid or not?

4) How to get revocation against closer notice vide dated 2/1/17. Put all evidence with inspection

report of GPCB in MOM.

5) The evidence of CSR activities to be put in MOM.

6) How many Land Looser are taken in company and how many pending and their name and address

to be taken in MOM.

7) Describe details of total greenbelt.

Undersigned,

Ajitsinh B Raj,

President,

Bhartiya Kishan Sangh

Annexure C - 5

From: paryavaran mitra <[email protected]> Sent: Monday, March 5, 2018 2:47 PM To: Collector-Bha Cc: Gpcbpublichearing; ms-gpcb; Rashesh R Vyas(GoG-GPCB Dept.) Subject: Suggestions/comments for EPH of M/s MeghmaniFinechem Ltd, GIDCDahej, Ta: Vagra, Dist. Bharuch to be held on 07/03/2018 Ref: PM/MP/EPHC/2018 Date: 03/03/2018 To, Collector &Chairman Bharuch District level Environmental public hearing Committee, Collector Office, Bharuch Sub:Suggestions/comments for Environmental Public Hearing of M/s MeghmaniFinechem Ltd, GIDCDahej, Ta: Vagra, Dist. Bharuch to be held on 07/03/2018 Dear Sir, Our organization is working for strengthening of public-participation since 1997 and is bridge

between people, government and industries in Gujarat as well as in India. We have been

analyzing almost all the EIA reports of the projects of Gujarat and try to lead industrial

development in sustainable manner.

We have studied the draft EIA report of the above-mentioned project, public hearing of which is going to be held on 7th March 2018 under your chairmanship. Under EIA notification 2006, as a plausible stakeholder, we are taking opportunity to send additional observation/comments/questions regarding project and draft EIA report. We have read and reviewed the EIA report prepared by Kadam Environmental Consultant and, on the basis of our analysis, we submit following suggestions: 1. The EIA report has been divided in 13 chapters, of which 8th chapter is important for

thelocally affected people, namely Project Benefits. We find this chapter very vague and needs

to be detailed. Please explain the benefits in more detail to public during the public hearing. In

8.2, it is written that near-by villagers would get benefits of drinking-water, solar energy,

student-support etc. which is appreciable. But, there are many industries in this area so it must

be taken care that there is no duplication of work done under CSR. So, we suggest that a

committee of near-by villagers and surrounding industries should be made under the

chairmanship of Collector and the said works should be done in correspondence to their needs.

2. On page number 55 of EIA report, in table number 2.22, E-waste Rules, 2011 is printed. It

is a mistake. It should be E-waste Rules, 2016.

3. Please justify the need of expansion of Power Plant’s capacity from 65 MW to 132 MW?

Annexure C - 5

4. On page number 53, in 2.11.2, it is written that ETP capacity shall increase to 10%. We

suggest that it should be increased more than 10%.

We appreciation following things in the Draft EIA Report:

1) Earlier Environmental Clearance copies are attached with the report.

2) Compliance reports are also attached.

3) We appreciate that the report has included the showcausenotices by GPCB.

4) We appreciate the style of preparing this EIA. On various pages, they have put actual

photographs of the place. For example, on page 74, photographs of AAQ Sampling Stations at

different villages are included. Interestingly, on page 84, the report has included photographs

of surface water of different ponds. On page 99, they have included photographs of flora at

project site. We highly appreciate these steps.

Yours truly,

Mahesh Pandya

cc: 1. Member Secretary GPCB, Gandhenagar

2. Regional officer, GPCB, Bharuch

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

COVERING NOTE- URGENT - date 5 March 18

Proponent : Meghmani finechem ltd, Dahej, Gujarat

Accredited consultant : Kadam environmental consultants,Vadodara.

Environment public hearing on 7 March 2018

EIA REPORT SEEMS TO BE INCOMPLTE IN MANY RESPECTS, It

seems that, lot many statutory and other queries being attracted

from EIA report, we wonder, how project will be environmentally

sustainable, and how GPCB has mere misses for such important

queries, and can, environment public hearing be conducted on the

basis of such misleading EIA report.-can such EIA report ensures

setting up an environmentally SUSTAINABLE project in Gujarat.

FROM

Jayeshbhai Shankarbhai Patel,36, Jai Jalaram Society,Tadwadi,

Rander Road,Surat, 395005,Gujarat.

This e mail sent from our own Email- id [email protected],

To,

[email protected],

Cc,

[email protected], [email protected],

[email protected],( SLEAC copy & file no. not available

in EIA 1 OR 2)

[email protected], confirmation on continuity status of all

FAE , during the period Dec 15 to Jan 18, as referred in EIA

1 page 3,4,5, NOT AVAILABLE IN EIA REPORT,

[email protected], -report is incomplete in many statutory &

technical aspects, it is a question, whether this EIA can

ensure setting up of an environmentally sustainable

project, no wonder, as usual , at later date, GPCB only will

issue a closure notice for non conformances of set norms.

misleading EIA reports, leads to issue of closure notices by

GPCB, and at times, issueing of closure orders by NGT as

applicable, leading the core issues of unemployment, and

loss of revenue to Govt, we definitely expect a better

quality of EIA report prepared by an GOVT.approved

environment consultant, hope all environment ministry &

pollution control board responsible staffs do agree to this,

earlier also lot many short falls-mistakes-

misleading/incomplete information both

Annexure C-6

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

technical/statutory-were reported on EIA reports prepared

by referred consultant, we strongly appeal MoEF-SLEAC-

GPCB-QCI-NABET, consider this as suo moto, to revarify

the quality of all earlier EIA reports of at least last thee

years for a appropriate desired corrective action, so only

environment sustainable projects can be set up in Gujarat.

Public is not supposed to correct and improve EIA

report, prepared by QCI-NABET ACCREDITED

CONSULTANT, whom, proponent must have paid very

high professional fees, but still, we welcome projects in

Gujarat, we have just taken some pain to refer EIA at

random, in past, as we have been observing, lot many

statutory & other queries has reported in EIA prepared by

referred consultant.

Respected sirs,

WE ARE FORWARDING HEREWITH OUR WRITTEN

COMMEMNTS FOR ENVIRONMENT PUBLIC HEARING OF

m/s Meghmani Finechem ltd ( MFL), Dahej, DIST. Bharuch,

Gujarat, on 7 March 18,WITH ATTACHMENTS OF DESIRED

EIA 1, 2, PAGES extracted from EIA report, which was

uploaded on public domain-GPCB web site, for public view

all over the globe.

We appreciate corporate level multi functional proponent

and reputed consultant having enrich experience in

preparing EIA report, is honest & he has submitted most of

details in EIA ,1,2, but we failed to understand why core

information and very important supporting documents NOT

PROVIDED, this leads to raising undue queries wasting

time of all concerned with public consultation process.

We are of the opinion, that, it seems that, neither

consultant OR proponent has carried our any pre-review

studies of EIA,1,2, at their end, and just submitted it to

GPCB/SLEAC,

We more wonder, how GPCB/SLEAC has a mere misses

even by their own experts, responsible and highly paid

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

staff at RO level, UNIT HEAD level, or any other responsible

staff who has examined this EIA report before requesting

Dist. Magistrate-dist. Bharuch, for a suitable date for

environment public hearing, and EIA reports ( certainly

prepared by QCI-NABET ACCREDITED CERTIFICATE holder,

backed by many well qualified approved coordinator and

many FAE – employed and empanelled one ) up loaded on

GPCB web site for public viewing at global level.

We request MS-GPCB to register

our comments and obtain a

satisfactory reply, from proponent,

incorporate the same in MoM with

all desired explanations and

supporting documents, and send

hard copy to our address as

submitted, HOPE, all statutory &

technical reply also should be

acceptable to GPCB-SLEAC as

applicable, before incorporating in

MoM.

COMMENTS

01

QCI-NABET accredited certificate in EIA 2, pages

139,141,do refers sector 4 approval,( with some remark of

cross reference on the basis of which Accredited

certificate was issued) but we failed to understand, what

was the constraint for NOT SUBMITING further very

important supporting document, as desired in 02, 03, just

to be more transparent on referred issue. PL provide due

justification THROUGH HARD COPIES, why following very

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

important documents were not submitted in EIA.

02

(i)

PL provide, hard copy of NABET, due justification for all

desired FAE approval, details, from DEC 15 to Jan 18, as

submitted in DECLARATION, on EIA 1, pages 3,4,5.

( pl do not ask us to refer to web site )

(ii)

PL FILL UP ATTACHED ANNEXURE A, WITH ALL DESIRED

DETAILS ON CONTINUITY OF NABET APPROVAL OF ALL

FAE, FROM DECEMBER 15 TO JANUARY 18.

03

(i)

Pl provide copy of Letter of QCI/NABET/ENV/ACO/17/0284

dared 22 March 17, as it is not submitted in EIA 2,

(ii)

Ref ToR compliance on EIA 1 page 30, sr no.53,

Compliance on EIA 1 page 202,

(a)

When ToR 53 issued by SLEAC ( refer EIA 1, page 30,

clearly demands, QCI-NABET ACCREDITED CERTIFICATE (

naturally valid one ) ,then pl confirm whether SLEAC has

approved your written request to submit QCI-NABET ‘letter

of accreditation’ , if so, provide a copy of written approval

from SLEAC, and if you do not have it, how you have take it

granted, that this also will be OK at par with accredited

certificate, then what is value addition of ACCREDITED

CERTIFICATE AS DEMANDED IN ToR ?,

Pl provide explanation, If consultant has complied with all

NABET requirements, then why NABET has not issued an

ACCREDITED CERTIFICATE ?

(b)

PL PROVIDE AN EXPLANATION, WHY THERE IS NO COPY

OF QCI-NABET ACCRDITED CERTIFICATE AT EIA 1,

DESIRED PAGE 202, ( ToR 53 COMPLIANCE) IT IS JUST

MISGUIDING ONE AND ToR IS NOT COMPLIED WITH.

(iii)

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

Has QCI-NABET taken pre approval from MoEF, that at

times, having some constraint, NABET CAN issue a letter

of accreditation, which MoEF-SLEAC has to accept it in lieu

of ACCREDITED CERTIFICATE, as even a simple letter of

accreditation replace the CERTIFICATE CRDIBILITY!!! ( at

least not acceptable to public-as MoEF-SLEAC HAS NOT

SPECIFIED IN THEIR MANDATORY ToR AS AN

ACCEPTANCE OF ANY ALTERNATE-QUICK FIX IN LIEU OF

ACCREDITED CERTIFICATE ) there is no transparency in

EIA, every thing is confusing.

04

As per Declaration, Period of involvement is mentioned as

from December 2015 to January 2018, BUT, date of NABL

certificate is as mentioned as 03/02/16 to 02/02/18,

pl provide explanation why supporting documents not

provided, for period DECEMBER 15 to 02/02/16,

PL PROVIDE HARD COPIES OF DESIRED DETAILS

IMMIDIATELY.

05

Pl provide due explanation why the of NABL scope of ALL

desired analysis,( other than ‘CHEMICAL TESTING) is not

submitted in EIA 3,

PL PROVIDE HARD COPIES OF DESIRED DETAILS

IMMIDIATELY.

06

MoEF documents, as refers in EIA,2 pages 143 to 147,

refers period up to 06.12.17, pl provide explanation, why

copy of further extension OR fresh approval not submitted

from 07.12.17 to January 18, and onwards,

Pl submit hard copies of desired details.

07

Pl also provide hard copies of SCOPE OF ANALYSIS for all

analysis carried out under a coverage of MoEF lab

approval.

08

Pl refer EIA 2 pages 326 to 334, pl provide explanation as

why proponent’s retained QCI-NABET ACCREDITED

CERTIFICATE HOLDER ENVIRONMENT CONSULTANT-

though mandatorily desired- but has failed to submit hard

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

copies of NABL/ MoEF lab VALID approval documents of

(Supreme, SAAL, EXCELL,) not in EIA report.

Pl submit all desired documents immediately and cover in

minits, failing of which, all such analytical will be

considered as not authentic AND PROPONENT WIL HAVE

TO CARRY OUT ALL SAMPLING AGAIN,

09

ToR 42 GREEN BELT-Ref EIA 1 page 29, sr no. 42,

Compliance in EIA 1 page 180,

As per EIA page 1, page 321 plot area is 5,33,470,

m2/4047=132 acres=1,32,000 trees to be planted, as per

set norms of 1000 tres per acr of total plot area

Present trees , planted 24,000 species ( EIA 1page 180),

Plus, 11,000 will be planted in five years time, ( EIA1 page

182), and for additional green belt, 2500 additional trees

will be planted in five years time, ( ref EIA 1 page 184) so

total trees will be 37,500 trees , will be short by

94500 trees!!!,

EIA does not comply tree density as 1000 trees per acre of

total plot area, if proponent differs, then pl provide a

written directive from MoEF-SLEAC-GPCB, what tree

density norms are given to proponent and when was given.

Why there is no mention on, PLANTING TREES OUT SIDE

OF PREMISES, ToR IS NOT COMPLIED TO THIS EXTENT.

PERHAPS WATER REQUIREMENT FOR GREEN BELT MAY

CHANE SO WATER BALANCE ALSO WIL BE CHAMNGED, PL

UPDATE EIA REPORT ACCORDINGLY AND CONFIRM.

GPCB-SLEAC, should note , within available time span, we

have just refer two important ToR compliance, but both the

compliances are not in order, so proponent has to recheck

his EIA properly for a due compliance of all other ToR, and

UP DATE it in WELL IN order before conducing of

environment public hearing.

10

Ref EIA 1, page 25, pl provide explanation why details on

SLEAC ToR issue date, file no. and copy of SLEAC ToR not

ENVIRONMENT PUBLIC HEARING-MEGHMANI-MFL-DAHEJ,GUJARAT,ON -070318

submitted in EIA 1, OR EIA 2,

Pl provide all details and supporting documents, to confirm

ToR details and it’s compliance.

11

In view of looking at PRIMA FAECIA, so many query on

statutory & technical non conformances are attracted from

EIA prepared by QCI-NABET ACCREDITED CONSULTANT, pl

explain, how mandatory declaration as submitted by

proponent and consultant, on EIA 2 pages 149,150, can be

in order?

12

Pl provide hard copy of presentation, which will be shown

In environment public hearing and if any detail is different

than as submitted in executive summary, pl specify it in

hard copy, and why it is different,

PL SUBMIT THE HARD COPIES DESIRED SUPPORTING

DOCUMTS BEFORE THE COMMENTCEMENT OF SCHEDULE

TIME OF ENVIRONMENT PUBLIC HEARING, WITH A

REQUEST TO COVER THE SAME IN MINITS AND COPY OF

REPLY TO US TO BE FORWARDED AT OUR ABOVE

MENTIONED ADDRESS THROUGH SUITABLE MENS

PL NOTE, EVEN AT LATER DATE, IF IT IS KNOWN THAT THERE WERE

SOME INCOMPLETE INFORMATIONS-MISLEADING INFORMATIIONS-

NOT FACTUAL INFORMATIONS,IN DRAFT EIA OR IN FINAL EIA,

THEN ISSUED ENVIRONMENT CLEARANCE MAY BE LIKELY TO

CANCELL BY MoEF-SLEAC AS APLICABLE.

PL DO CONTACT US IF YOU NEED ANY MORE DETAILS-

INFORMATION.

WE WELCOME ALL ENVIRONMENTALLY SUSTAINABLE PROJECTS

IN OUR FAST PROGESING ‘GARVI GUJARAT’

Thanks,

Jayeshbhai s patel,

( email sent through our own e mail id-as above)

Enc:

FEW DESIRED PAGES , EXTRACTED FROM EIA REPORTS, ARE

ATTACHED HERE WITH FOR A READY REFERENCE

ANNEXURE A Date 5 March 18

Ref : Consultant- Kadam environmental consultants, Vadodara, Gujarat, proponent- MEGHMANI FINECHEM LTD, DAHEJ,GUJRAT. NABET SECTOR 4 Thermal power Project category B, study period- December 15 to January 18

Referring, to details of accredited certificates & accreditation letter, as submitted in EIA 1, page 5, last para,& in EIA 3, pages, 410,411,412 , no further confirmatory details available on CONTINUITY of NABET APPROVED all FAE, ( except one month lapse as applicable) as referred in DECLARATION in EIA 1 pages 3,4,5 PL. PRIOVIDE CONFIRMATION ON CONTINUITY OF COORDINATOR FOR NABET SECTOR 4 FOR ALL FAE, FOR PERIOD DEC.15 TO JAN. 18 AS PER EIA page 3,4,5 Proponent has to submit details on attached formate at A, and sr no 1-to-12-as , WITH SUPPORTING COPIES OF NABET( NO EB SITE REFERENCE TO BE GIVEN) PL. WRITE IN COLUMN ‘A I EMPANNALLED, OR EMPLOYEE, AS APPLICABLE, AND IN COLUMN II ,III,IV,V,VI & VII as’ YES OR NO’. AS APPLICABLE.- & IT IS A ‘MUST’ to confirm, TO JUSTIFY the authenticity of DECLARATION as submitted by consultant ,head of ACO, EIA 1 page 5, and ‘UNDERTAKING as submitted by proponent at EIA 3 ,page 420.,HOPE, NABET WILL COOPERATE THE ‘PUBLIC’ WITH AN UNBIAS OPINION, NABET CAN ALSO REFER EARLIER EIA REPORTS OF THIS CONSULTANT ON THE BASIS OF SUO-MOTO. In case if details submitted are not in well order, then we leave it up to GPCB- SLEAC-QCI-NABET to work out further line of action, on ascertaining the treliability of consultant & authenticity of entire EIA report, on the base on other statutory query & technical query as reported by us OR as reported by others in this environment public hearing, pl. note, since this is a mandatory issue, for any non conformance, any types of logical reply will not be acceptable

A

SANGRAM coordinator

I

II III

IV

V VI VII

Employee Or Empannelled

DEC 15 FAE YES / NO

JAN 16 FAE YES/ NO

DEC 16 FAE YES. NO

JAN 17 FAE YES/NO

DEC 17 FAE YES/NO

JAN 18 FAE YES/NO

FAE FA 01 JESSICA LU

02 SAMGRAM AP

03 SANGRAM AQ

04 KUNDAN WP

05 KHUMAN EB

06 SOHAM NV

07 ANIL SE

08 NEERAJ HG

09 NEERAJ GEO

10 B.K PATEL, SC -\

11 JITIXA RH

12 SAMEER SHW