1 2 3 General Project information : Education Quality Improvement Project II (EQUIP II Project Implementing Agency: Ministry of Education of the Islamic Republic of Afghanista Country: Borrower: Project Name: Revised Procurement Plan EQUIP II (Revision Ref.: 04 on 15-05-10) Procurement Management Unit Education Quality Imrpovement Program-II FY2008-10-11 PROCUREMENT PLAN MINISTRY OF EDUCATION EDUCATION QUALITY IMPROVEMENT PROGRAM-II AFGHANISTAN Grant No.: Project ID : Afghanistan Islamic Republic of Afghanistan Education Quality Improvement Project II (EQUIP II H 354 –AF P106259 Bank’s approval date of the procurement Plan : 17 Nov.2007 (Original:) Period covered by this procurement plan: One year Procurement for the proposed project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Legal Agreement. The procurement will be done through competitive bidding using the Bank’s Standard Bidding Documents (SBD). . The general description of various items under different expenditure category are described. For each contract to be financed by the Loan/Credit, the different procurement methods or consultant selection methods, estimated costs, prior review requirements, and time frame are agreed between the Recipient and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of afghanistan - World Bank Documents

1

2

3

General

Project information: Education Quality Improvement Project II (EQUIP II)

Project Implementing Agency: Ministry of Education of the Islamic Republic of Afghanistan

Country: Borrower:Project Name:

Revised Procurement Plan EQUIP II (Revision Ref.: 04 on 15-05-10)

Procurement Management Unit

Education Quality Imrpovement Program-II

FY2008-10-11

PROCUREMENT PLAN

MINISTRY OF EDUCATION

EDUCATION QUALITY IMPROVEMENT PROGRAM-IIAFGHANISTAN

Grant No.:Project ID : P106259

AfghanistanIslamic Republic of AfghanistanEducation Quality Improvement Project II (EQUIP II)H 354 –AFP106259

Bank’s approval date of the procurement Plan : 17 Nov.2007 (Original:)

Period covered by this procurement plan: One year

Procurement for the proposed project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Legal Agreement. The procurement will be done through competitive bidding using the Bank’s Standard Bidding Documents (SBD). . The general description of various items under different expenditure category are described. For each contract to be financed by the Loan/Credit, the different procurement methods or consultant selection methods, estimated costs, prior review requirements, and time frame are agreed between the Recipient and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

12

3456

1

2

3

4

5

6

123

Comments1234

Procurement MethodCivil Works

Comment

II. Goods and Works and consulting services.

Prior Review Threshold US$ 500,000 or more per contract US$ 200,000 or more per contractAllDirect Contracting

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

US$ 5,000,000Threshold for Methods

Goods

Regardless of value

Single Source Selection

US$ 100,000 or more per contractUS$ 50,000 or more per contractAll firms and Individuals

Consulting Services (firms)Consulting Services (Individual)

NCB Goods

ICB Goods

US$ 100,000

US$ 200,000

US$ 200,000

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Comments

US$ 100,000

III. Selection of Consultants

Selection Method Prior Review Threshold $

Equivalent or moreNCB Civil Works US$ 5,000,000 Equivalent or less

Equivalent or lessEquivalent or more

Procurement MethodICB Civil Works

Equivalent or lessCommunity Contracts

Shopping Goods Equivalent or less

Regardless of value

4All

200,000 equivalent or above

Comment

Single Source (Firms & Individuals)

200,000 equivalent or above

Regardless of value

Selection Method

QBS/FBS/LCSQCBS

Threshold for Methods

Competitive Individual Competitive Methods  (Firms)

50,000100,000

1. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

200,000 equivalent or less200,000 equivalent or lessCQS/QBS/FBS/LCS

QBS/QCBS

S. No. Procurement TypeNumber of Projects/ Package

Total Amount in USD

S. No.Procurement Type

Number of Projects/ Package

Total Amount in USD

1 2 3 4 5 6 7 8

1 NCB 96 $ 18,476,300.00 1 NCB 177 $ 26,380,347.40

2 PED $ - 2 PED 8 $ 1,160,006.00

3 CC 621 $ 32,610,000.00 3 CC 857 $ 43,818,408.00

4 Trainings $ - 4 Trainings 12 $ 2,812,645.00

5 TTC 4 $ 1,660,000.00 5 TTC 5 $ 1,680,000.00

6 Goods 18 $ 4,165,000.00 6 Goods 22 $ 7,478,913.78

7 IC N/A $ 3,651,720.00 7 IC N/A $ 6,913,210.00

8 C. Firms 8 $ 56,926,443.00 8 C. Firms 8 $ 22,569,000.00

9 Operation Cost $ - 9 Operation Cost EQUIP+TED $ 2,627,587.90

10Quality Enhancement Grants for 2536 schools in 29 provinces

$ - $ 5,727,580.00

117,489,467.00$ Sub Total 121,167,698.08$

Procurement Plan EQUIP II Ref. 03 on 14-03-09 R. Procurement Plan EQUIP II Ref. 04 on 15-05-10

Sub Total

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 NCB 1.1 Darululum School 140,000.00$ 140,000.00$ 6037471 N N MOE 10 NCBIbeem roofing

Jul-08 Jan-09 M/s Khalid Basheer CC

2 NCB 1.2 Qarqach Kandalan Boys School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-010 Jul-011 New Project Purposed

3 NCB 1.3 Sina Urdo boys School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-010 Jul-011 New Project Purposed

4 NCB 1.4 Kunbad Kalora School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-010 Jul-011 New Project Purposed

Sub Total 524,000.00$ -$

1 NCB2.1 Turabi Girls School 112,000.00$ 5802894 N N MOE 8 NCB RCC Aug-08 Oct-09 M/s Siar Qurban CC2 NCB2.2 Abul- muyid Balkhi -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB Ibeem roofing with GI SheetJul-08 Jan-09 Bids due for opening in August 20083 NCB2.3 Abu-Rayan Alberuni 224,000.00$ 8807338 N N MOE 16 NCB Ibeem roofing with GI SheetAug-08 Oct-09 M/s Habib Aryan CC4 Farida Balkhi High School 140,000.00$ 105 Deeragai 112,000.00$ 86 Bangala 112,000.00$ 87 Tatai 112,000.00$ 88 Salarzai 112,000.00$ 8- Abul-Hameed -$ Dropped as it is not a formal School

9 Sultan Ibrahim Adham Girls School -$ 128,000.00$ 8 Jul-010 Jul-011Replacement of above school/ Projct Name has been revised from Charbagh Girls School to Sultan Ibrahim Adham Girls School

10 Charbulak High school 112,000.00$ 8345733 8 Jul-08 Oct-09 M/s Abdullah Qurban CCSub Total 1,036,000.00$ 384,000.00$

1 NCB5.1 Tarbiyae Maleem School 140,000.00$ 140,000.00$ 8282282 N N MOE 10 NCB Ibeem roofing with GI sheetAug-08 Feb-09 M/s Baheshti CC2 NCB5.2 Darululum School 140,000.00$ 140,000.00$ 8172656 N N MOE 10 NCB Ibeem roofing with GI SheetAug-08 Feb-09 M/s Baheshti CC

Sub Total 280,000.00$ -$

1 Sultan Mahmmod Rawza High School -$ 160,000.00$ 10 NCB RCCBids due for opening in August 2008 Project name has been revised from Alberuni Qarabaghi boys to Sultan Mahmood Rawza High Schoo

- Imam Hadad -$ 8 NCB RCC dropped due to land problem

2 Jihan Numai Garmab School -$ 128,000.00$ NCB RCCRepalcement of above school/ Project name has been revised from Nazar Khan Baba school to Jihan Numai Garghi High School

3 Shahre kuhna Boys 140,000.00$ 7932723 10 NCB RCC M/s Arun Zaki CCSub Total 140,000.00$ 288,000.00$

Bids opened on 27 Decembert 2008 and contract under issue

Jan-09

RCC

NN MOE

NCBN

N MOEN NCB

NCB2.4 Y

List of Schools of Badghis Province

List of Schools of Balkh Province

List of schools of Daikundi Province

List of Schools of Ghazni Province

MOE RCC Jul-08

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

588,000.00$

Mar-09

NCB2.5 224,000.00$

NCB6.1 288,000.00$ Aug-09

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

1 NCB7.1 Shiekh Mohammad Saghari High School -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC2 NCB7.2 Taqa Tamor High School 128,000.00$ -$ 128,000.00$ N N MOE 16 NCB Ibeem Roofing with GI sheet3 NCB7.3 NaswaneSultan Razia -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC4 NCB7.4 Darululum School -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC5 NCB7.5 Dawlatyar Girls Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed6 NCB7.6 Deh Haji High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed

Sub Total 384,000.00$ 672,000.00$

1 NCB8.1 Fushaj High School $ 160,000.00 $ 160,000.00 10088324 N N MOE 20 NCB Ibeem roofing with GI sheetJul-08 Oct-09 M/s Refa Sadat CC2 NCB8.2 Qalae Jawhar $ 128,000.00 $ 128,000.00 11002893 N N MOE 16 NCB Ibeem roofing with GI sheetJul-08 Oct-09 M/s Sahail Mumtaj CC3 NCB8.3 Lycee Inqelab $ 280,000.00 $ 280,000.00 10920264 N N MOE 20 NCB RCC Jul-08 Oct-09 M/s Adnan CC4 NCB8.4 Shara Parda $ 128,000.00 $ 128,000.00 8732681 N N MOE 16 NCB Ibeem roofing with GI sheetJul-08 Oct-09 M/S Nav Bast CCn 5 NCB8.5 Said Mohammad Qanat $ 224,000.00 $ 224,000.00 8460513 N N MOE 16 NCB RCC Jul-08 Oct-09 M/s Adnan CC6 NCB8.6 Jebrail Middle School $ 224,000.00 $ 224,000.00 8617536 N N MOE 16 NCB RCC Aug-08 Oct-09 M/s Adnan CC7 NCB8.7 Fakhri Saljoqi $ 128,000.00 $ 128,000.00 N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed8 NCB8.8 Ghoran Midle School $ 128,000.00 $ 128,000.00 N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed9 NCB8.9 Ghaibatan High School $ 128,000.00 $ 128,000.00 N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed

Sub Total 1,528,000.00$ -$

1 NCB9.1 Surkh Abad High School -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC Sep-08 Mar-09Project name has been revised from Pada Khwab Roghani High School to Surk Abad Boys High School

2 NCB9.2 Naser Kamal Khail Girls School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Aug-10 Aug-11 New Project PurposedSub Total 128,000.00$ 256,000.00$

1 NCB10.1 Darululum School 140,000.00$ 140,000.00$ 6034868 N N MOE 10 NCB Ibeem roofing with GI sheetSep-08 Mar-09 M/S Noor Aftab CC2 NCB10.2 Unkhi High School 480,000.00$ 480,000.00$ N N MOE 30 NCB RCC Jul-10 Jul-11 New Project Purposed3 NCB10.3 Milad u Nabi Midle School 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC Jul-10 Jul-11 New Project Purposed4 NCB10.4 Abkazar Girls High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed5 NCB10.5 Hazrat Bilal School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed

Sub Total 1,132,000.00$ -$

List of Schools of Ghor Provice

Aug-09 Mar-09

List of Schools of Maidan Wardak Province

List of Schools of Logar Province

List of schools of Paktia Province

List of Schools of Hirat Province

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

1 NCB12.1 Aryoob Jaji High School $ 128,000.00 $ 128,000.00 10715024 N N MOE 16 NCB Ibeem roofing with GI sheetJul-08 Mar-09 M/S Sadad Mohammad cc- NCB12.2 Daulat Zai School -$ -$ N N MOE 8 NCB RCC Sep-08 Mar-09 Dropped due to land problem

Sub Total 128,000.00$ -$

1 NCB13.1 Khinj High School 112,000.00$ 112,000.00$ 6424005 N N MOE 14 NCB Ibeem roofing withGI SheetJul-08 Mar-09M/s Basharat Noori CC

Sub Total 112,000.00$ -$

- NCB14.1 Zulfiqar boys School -$ -$ N N MOE 8 Dropped as it si built bt PRT- NCB14.2 Darae Sayedan High School -$ -$ N N MOE 8 Dropped as it si built bt PRT- NCB14.3 Darululum School -$ -$ N N MOE 10 Dropped as it si built bt PRT- NCB14.4 Hale Hunud School -$ -$ N N MOE 8 Dropped as it si built bt PRT

Sub Total -$ -$

1 NCB26.1 Darululum School 140,000.00$ 140,000.00$ AFA 6,660,711.00 N N MOE 10 NCB Ibeem roofing with GI SheetSep-08 Dec-09 Kabul itefaq CC

2WU-153 Yoltarab School -$ -$

N N MOE NCB Ibeem roofing with GI SheetJul-10 Jul-11Shifted from EQUIP I/ Planed for 1389/ Project Procurement Method has been changed to CC

Sub Total 140,000.00$ 0

1 NCB27.1 Technical School 140,000.00$ 140,000.00$ 6739198 N N MOE 10 NCB Ibeem roofing with GI SheetJul-08 Apr-09 M/S Chungar CCSub Total 140,000.00$ -$

1 NCB16.1 Abul Hasan Khirqani High School 112,000.00$ 112,000.00$ 6613379 N N MOE 8 NCB RCC Oct-08 Apr-09 M/s Shahi Kot CC2 NCB16.2 Nisar ahmad shaheed $ 224,000.00 11172380 16 Oct-08 Apr-09 Ms/ Sebaqat Wafayee CC

3 NCB16.3 Ashrafia Tarashud Midle School -$ 128,000.00$ 8 Aug-10 Aug-11Projec Name has been revised from Nawabade katayan to Ashrafia Tarashud Midle School

- NCB16.4 Darululum School -$ -$ N N MOE 10 NCB RCC Oct-08 Apr-09 Dropped as Built by other AgencySub Total 336,000.00$ 128,000.00$

List of Schools of Kabul City

List of Schools of Parwan province

List of schools of Sar-e-Pol Province

RCCMOE

List of Schools of Takhar Province

N $ 352,000.00 N NCB

List of schools of Panjsher Province

List of Schools of Samangan Province

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

1 Darul Maleemin School 140,000.00$ 9991879 10 Aug-08 Dec-09 M/sAfghan Tamir CC2 Mahjoba Herawi Girls School 420,000.00$ 24365130 30 M/s Mansoor Ayub CC3 Baihaqi Boys school -$ 384,000.00$ 244 Zabihulla Shahid Secondry school -$ 128,000.00$ 8- Ibne Sina High school/Mohammad Seddiq FARHANG -$ -$ 30 Dropped due to land 5 Alam Faizad High school -$ 128,000.00$ 86 Ustad Misba Secondry school 420,000.00$ 22263211 30 Jul-08 Feb-09 M/s Noor Aftab CC7 Abizar Ghafari High school 224,000.00$ 9991879 16 M/s Afghan Tamir8 Sayed Ismael Balkhi High school 280,000.00$ 12056296 20 M/s Mushfaq Qadri CC9 Qala Bahador Khan Secondry school 420,000.00$ 18043389 30 M/s Zia Noori CC10 Shahrak Omid Sabz boys Primary school -$ 256,000.00$ 1611 Shahrak Omid Sabz Girls Primary school -$ 256,000.00$ 16- Aqa Ali Shams Boys secondry school -$ -$ 24 Dropped due to land

12 200 Family Rahman mina High school 420,000.00$ 121823267 30 Ms Noor Constructionj Company

13Saye Noor Mohammad Shah Mina boys secondry school

420,000.00$ 21832267 30 M/s Qanat Akbar shah CC

14 Hesa Awal Shah Shahid school -$ 320,000.00$ 20- Shah Shahid Khas Secondry school -$ -$ 30 Dropped due to land

15 Ali Ahmad Popal High school -$ 480,000.00$ 3016 Bibi Mahro boys High scool -$ 480,000.00$ 30- Qabil Bay Secondry school -$ -$ 16 Dropped due to land

17 Khowaja Rawash Secondry school -$ 128,000.00$ 8- Aziza Afghan Secondry school -$ -$ 16 Dropped due to land

18 Sadudin Ansary Secondry school -$ 128,000.00$ 8- NCB15.10 Chamandi Char Qala Wazir Aabad -$ -$ -$ Dropped due to land

19 Elhaqia Saidal Nasiry -$ 256,000.00$ 1620 Khair Khana # 16 secondry school -$ 128,000.00$ 821 Chashma Kotal secondry school (Azadi) -$ 128,000.00$ 8- Naw Abad Pul-i-Charkhi high school -$ -$ 8 Dropped due to land- Arzan Qemat Girls secondry school -$ -$ 8 Dropped due to land- Block 12 Primary school -$ -$ -$ Dropped due to land

22 Block 11/9 primary school 434,000.00$ 420,000.00$ 19,008,837.00 31 NCB RCC Aug-09 Mar-10 M/s Maushfaq Qadri CC- Dowazda Imam Mixed primary school -$ -$ 16 Dropped due to land

23 Bibi Zainab Kobra secondry school -$ 128,000.00$ 824 Hamayun Shahid high schoool -$ 128,000.00$ 8- Abdul Ghafor Ahmadi -$ -$ 16 Dropped due to land- Shahrak Khorasan High school -$ -$ 30 Dropped due to land

24 Hale Hunud School -$ -$ 8 Dropped due to land- NCB 15.15Disabled and Blind school -$ -$ MOE Aug-09 Mar-10 Dropped due to land

25 NCB 15.16Administrative Building for Infrastructure Department

80,000.00$ -$ 80,000.00$ NCB RCC Aug-10 Aug-11 New Project Purposed

Sub Total 3,258,000.00$ 3,456,000.00$

Mar-10

Mar-10

N

Aug-09

N

Mar-10

Mar-10

NCBAug-09

Aug-09N

Aug-09MOE

Aug-09

RCC

Mar-10

Mar-10

NCB15.14

NCB15.13Aug-09

Mar-10N

-$ N NCB RCC

N

Aug-09

NCBAug-09

RCC

Mar-10

Y

N

N MOE

MOE

N Y MOE

NCB

NCB15.12

256,000.00$

NCB15.8

NCB15.9

NCB15.11

256,000.00$

960,000.00$

512,000.00$

Y

Y

N

NCB15.3

700,000.00$

644,000.00$

YNCB15.4

640,000.00$ YNCB15.2

MOE

MOE

MOE NCB

NCB15.7

512,000.00$

320,000.00$

NCB15.5

NCB15.6 840,000.00$

NCB

NCB

MOE

Y

N

N Mar-10

Mar-10

Aug-09

RCC Aug-09

RCC

NCB

MOE

MOE

Feb-09

MOE

Aug-08

MOE RCC

NCB

NCB

Mar-09

Aug-08

NCB15.1 560,000.00$

Aug-09N

NCBY

N

RCC

N

NCB

Aug-09

Mar-10

RCC

RCC

Feb-09

RCC

RCC

RCC

N

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

1 NCB17.1 Amir Habibullah 160,000.00$ 160,000.00$ 8958885 N N MOE 16 NCB Ibeem roofing with GI SheetOct-08 Apr-09 M/s Bright International CC2 NCB17.2 Sahak girls School 160,000.00$ 160,000.00$ 8958885 N N MOE 16 NCB Ibeem roofing with GI SheetOct-08 Apr-09 M/s Bright International CC3 NCB17.3 Farza Girls school -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC4 WU -154 Deh Araban Qargha 104,000.00$ 104,000.00$ N N MOE NCB Ibeem roofing with GI Sheet Shifted from EQUIP I/ Planed for 1389

5 WNC22Naswan Mirhamidullah, Girls, Mir Bacha Koat

55,000.00$ 55,000.00$ 61,893.20$ 3,094,660

NN

MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Baryalai and Haqeeq Construction Company

6 WNC28Construction of 1)Naswan Dehdana, Girls, Dehdana Hawza 7,

108,275.00$ 108,275.00$ 97,850.66$ 4,892,533

NN

MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10 Jamal Zai Construction Company

7 WNC 29Mirman Khajo, Girls, Guzar Achikzayee Hawza 1

108,275.00$ 98,461.80$ 4,923,090

NN

MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Engineering Techniques Construction Company

8 WNC32Khawaja Rawash, Boys & girls, Khwaja Rawash Hawza 9

99,972.40$ 99,972.40$ 99,743.86$ 4,987,193

NN

MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10JANS Construction Company

9 WNC 27 Naid Shahaed 108,275.00$ 108,275.00$ 102,087.30$ 5,104,365

NN

MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Instead of Khawaja Boghra, Boys, Khwaja Boghra Hawza 15

10 WU51 Charbran SchoolGumal district 108,275.00$ 108,275.00$ 107,278.54$ 5,363,927.00 N N MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10 Saem Construction Company

11 WU58 Taqumuddin Mixed H. School, Seogard

108,275.00$ 108,275.00$ 108,275.00

NN

MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Contracted through BRAC

Sub Total 1,120,347.40$ 256,000.00$

1 Yangi arigh $ 196,000.00 $ 420,000.00 8912245 14 Oct-08 Apr-09 M/s Bibi Hawa CC2 Mirwais minah $ 224,000.00 12096340 16 M/s Faiz Nawayee3 NCB19.2 Khuwajah do koh $ 128,000.00 $ 128,000.00 11603378 N N MOE 16 NCB Ibeem roofing with IG SheetOct-08 Apr-09 M/s Abdullah Qurban CC4 NCB19.3 Darululum School $ 140,000.00 $ 140,000.00 11052023 N N MOE 10 NCB RCC Oct-08 Apr-09 Ms Murad Fiaz

Sub Total 688,000.00$ -$

1 NCB20.1 Madrasae Abdul Wahab -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC Aug-09 Mar-102 NCB20.2 Ashorkhil Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed3 NCB20.3 Abdul Mobin Shaheed Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed4 NCB20.4 Qari Mir Usman Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed

Sub Total 384,000.00$ 160,000.00$

1 NCB28.1 Darulum school -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC2 NCB28.2 Doshi Girls High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed3 NCB28.3 Wahdat Mili Wardak Ha Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed4 NCB28.4 Dehzak School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed5 NCB28.5 Chinzai Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed

Sub Total 512,000.00$ 160,000.00$

1 NCB29.1 Darulum school 140,000.00$ 140,000.00$ N N MOE 10 NCB RCC Opened on 15 th November 20082 NCB29.2 Jangle Bashi 140,000.00$ 140,000.00$ N N MOE 10 NCB RCC Opened on 15th november 20083 WU-120 Gunbad School -$ 224,000.00$ N N MOE NCB RCC Aug-10 Aug-114 WU-124 Gul baldaq Takhta 112,000.00$ 112,000.00$ N N MOE NCB RCC Aug-10 Aug-115 WU-125 Dawlat Yar School 112,000.00$ 112,000.00$ N N MOE NCB RCC Aug-10 Aug-116 WU-126 Sawika School -$ 128,000.00$ 128,000.00$ N N MOE NCB RCC Aug-10 Aug-117 WU-127 Taloka 104,000.00$ N N MOE NCB RCC Aug-10 Aug-118 WU-148 Karutai School -$ 52,000.00$ N N MOE NCB RCC Aug-10 Aug-119 WU 119 Shinwari Gul tepa School 130,000.00$ 130,491.61$ N N MOE NCB RCC Millad Wasel Constructio company10 WU 120 Khaton Qala School 112,000.00$ 127,470.00$ AFA 5,747,558.70 N N MOE NCB RCC Zaihoon Haidary CC11 WU-121 Aamo School 128,000.00$ 128,000.00$ 127,465.91$ N N MOE NCB RCC Aziz Ghaznin Construction company12 WU-122 Naswane Archi School 128,000.00$ 128,000.00$ 133,834.50$ N N MOE NCB RCC Jamal Zai Construction Company13 WU-123 Kokcha School 80,000.00$ 80,000.00$ 96,021.34$ N N MOE 8 NCB RCC Star Land Construction Company14 WU-124 Bibi Asia Girls School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed15 WU-125 Haji Miralam Girls School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed

16 WU-126 Wakil Jamal Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed

Sub Total 1,466,000.00$ 128,000.00$

Mar-10

NCB19.1 N MOE

List of Schools of Kapisa Province

RCC

List of Schools of Jozjan Province

NCBN

Shifted from EQUIP I/ Planed for 1389 (To Be Checked Combinely)

List of Schools of Kabul Province

Aug-09

List of Schools of Kundoz Province

List of Schools of Baghlan Province

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

1 NCB23.1 Darulum school 140,000.00$ 140,000.00$ 6853515 N N MOE 10 NCB RCC M/s Nangrahar shaq CC

2WU-101 Shaheed Ahmad Shah Masood

School208,000.00$ 416,000.00$ 152,571.66$ N

N MOENCB

RCCAman Kaream Construction Company

3 WU-101.1 Badi-ul-abad Girls school 208,000.00$ 150,812.64$ N N MOE NCB RCC Aman Kaream Construction Company4 WU-102 naswani qalaei sheekhan 208,000.00$ 416,000.00$ 178,716.48$ N N MOE NCB RCC Aryana Ulfat Construction Company5 WU-102.1 mastora 208,000.00$ 189,958.04$ N N MOE NCB RCC Masir Roshan Construction Company6 WU-103 Badish School 52,000.00$ 104,000.00$ 38,081.91$ N N MOE NCB RCC Ansar Store Construction Company7 WU-104 Shah Gelyan School 52,000.00$ 39,898.48$ N N MOE NCB RCC Husa Construction Company8 WU-106 gumandak 64,000.00$ 64,000.00$ 68,549.27$ N N MOE NCB RCC Mashal Niazi Construction Company9 WU-107 Kaho Girls School 64,000.00$ 64,000.00$ 70,001.64$ N N MOE NCB RCC Mashal Niazi Construction Company

Sub Total 1,204,000.00$ -$

1 NCB4.1 Darulum school -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC Aug-10 Aug-11 New Project Purposed- NCB4.2 Rahe(Do) dara -$ -$ N N MOE 8 NCB Ibeem roofing with GI Sheet changed to CC- NCB4.3 Sheikhar Wali -$ -$ N N MOE 8 dropped because of Social Problem

Sub Total -$ 160,000.00$

1 NCB22.1 Darulum school 140,000.00$ 140,000.00$ 9725877 N N MOE 10 NCB RCC M/s Abdul Nazeef MasoodSub Total 140,000.00$ -$

- NCB30.1 Sarmashkan School -$ -$ N N MOE 8 Dropped as it’s build by an NGO1 WU-108 Qanat Akbarshah School 64,000.00$ 64,000.00$ 74,990.84$ N N MOE NCB RCC Faisal Zabih Construction Company

Sub Total 64,000.00$ -$ List of Schools of Nangrahar

1 NCB11.1 Majboor Abad High School -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC Aug-10 Aug-11 New Project Purposed- NCB11.2 Hale Hunud School -$ -$ MOE 8 Dropped due to land problem2 WU-94 Shamir Baba Primary School 80,000.00$ 80,000.00$ 95,560.78$ N N MOE NCB RCC Masire Roshan Construction Company3 WU-97 Shabi Primary School 80,000.00$ 80,000.00$ 95,502.64$ N N MOE NCB RCC Ghazni Afghan Construction Company4 WU-98 Ali Sher Primary School 64,000.00$ 64,000.00$ 70,295.10$ N N MOE NCB RCC Dawlat Shah Construction Company5 WU-99 Chilie Primary Schhool 64,000.00$ 64,000.00$ 70,186.15$ N N MOE NCB RCC Dawlat Shah Construction Company6 WU-100 Tor Largay Primary School 64,000.00$ 64,000.00$ 67,690.67$ N N MOE NCB RCC Bakhtar Bahar Construction Company7 WU-146 Qalae Akhund Girls middle 80,000.00$ 80,000.00$ $ 86,683.16 AFA 4334158 N N MOE NCB RCC M/s Etihad Khogyani CC8 WU-147 Keptan baba School 80,000.00$ 80,000.00$ $ 87,545.66 AFA4377283 N N MOE NCB RCC M/s Etihad Khogyani CC

Sub Total 512,000.00$ 256,000.00$

List of Schools of Laghman Province

List of Schools of Badakhshan Province

List of Schools of Farah Province

List of Schools of Nooristan Province

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

List of Schools of Khost1 NCB 31.1 Hale Hunud School 112,000.00$ 112,000.00$ 6498293 N N MOE 8 NCB RCC M/s Afghan Imperial CC2 WU-132 Bak High school -$ 64,000.00$ N N MOE NCB RCC Dropped3 WU-129 Abdul hie habebe high school 104,000.00$ 416,000.00$ 101,397.78$ N N MOE NCB RCC Wali Triziwal Construction Company4 WU-129.1 Alfatha high school 104,000.00$ 100,273.50$ N N MOE NCB RCC Rais Construction Compjany5 WU-130 Zakukhill madal school 104,000.00$ 96,220.67$ N N MOE NCB RCC Universal Construction Company6 WU-129.2 Lagan high school 104,000.00$ 98,783.74$ N N MOE NCB RCC Ajmal Hasas Construction Company7 WU-130 Achar Primary School 64,000.00$ 192,000.00$ 68,318.00$ N N MOE NCB RCC Rais Construction Compjany8 WU-130.1 Charban Primary school 64,000.00$ 86,260.00$ N N MOE NCB RCC Habib zaiconstruction Company9 WU-131 Meta Khan high school 64,000.00$ 60,356.00$ N N MOE NCB RCC Rais Construction Compjany10 WU-131 Shekh ameer high school 64,000.00$ 128,000.00$ 82,634.64$ N N MOE NCB RCC Awal Jaman construction Company

11WU-131.1 Shaheed Qadir Mohammad Middle

school64,000.00$ 66,511.00$ N N

MOENCB

RCCRais Construction Compjany

12 WU-133 Daragai 64,000.00$ 64,000.00$ 73,614.00$ N N MOE NCB RCC Afghan ImparialSub Total 912,000.00$ -$

1 NCB 25.1 Hale Hunud School 112,000.00$ 112,000.00$ N N MOE 8 NCB RCC 29th November opened and Contract under issue 2 Zarghuna middle Scxhool 78,000.00$ N N MOE NCB RCC Aug-10 Aug-113 Kaka said Ahmad 78,000.00$ N N MOE NCB RCC Aug-10 Aug-114 WU-137 Mashriqi Lycee 104,000.00$ 208,000.00$ N N MOE NCB RCC Aug-10 Aug-115 Shin Ghazi Baba 64,000.00$ 64,000.00$ N N MOE NCB RCC Aug-10 Aug-111 WU-134 Shaheed Khakrezwal girls 260,000.00$ 520,000.00$ 217,488.34$ AFA 10,889,641.00 N Y MOE NCB RCC Ahmad shahi manapal CC2 Shaheed Khakrezwal boys 260,000.00$ 242,859.24$ AFA12159962 N Y MOE NCB RCC M/S Community CC3 WU-134.1 Mia Abdul Hakim 104,000.00$ 624,000.00$ 104,134.64$ AFA 5206732 N N MOE NCB RCC M/S Argasthan CC4 WU-134.2 Shaheed .S.M.Dawod 104,000.00$ 102,391.22$ AFA 5119561 N N MOE NCB RCC M/s Haji Khan CC5 WU-134.3 Shaheed Ab Ahad .K. 104,000.00$ 104,139.46$ AFA 5206973 N N MOE NCB RCC M/S Argasthan CC6 WU-134.4 Zinab Middle school 104,000.00$ 102,717.28$ 5,135,863.91 N N MOE NCB RCC M/s Haji khan construction company

7 WU-134.5 Said Jamaludin Afghani girls 104,000.00$ 110,717.28$ AFA 5535864 N N MOE NCB RCC M/S Mashoor cc8 WU-134.6 Haji Miwais Nika 104,000.00$ 119,832.81$ AFA 6,000,029.00 N N MOE NCB RCC Ms/ Niazi Aryan CC9 WU-135 Aino High School 78,000.00$ 234,000.00$ 46,472.00$ AFA 2317563 N N MOE NCB RCC Rashteen AfghanConstruction Compjany10 WU-135.1 Mir Bazaar 78,000.00$ 47,725.00$ AFA2380052 N N MOE NCB RCC New BoostConstruction Compjany11 WU-136 Shahid Abdul latif 78,000.00$ 47,725.00$ AFA2380052 N N MOE NCB RCC New BoostConstruction Compjany12 WU-136 Mir wais Mina/Khaja ayub Ansari 78,000.00$ 65,391.34$ AFA 3,269,567.00 N N MOE NCB RCC M/s Garb Haleem CC13 WU-136.1 Mirwais mina Girls 78,000.00$ 63,035.44$ AFA 3151772 N N MOE NCB RCC M/s Gulishatn sistan14 WU-137 Said Abad 78,000.00$ 59,151.36$ AFA 2957568 N N MOE NCB RCC M/sJaved Masood cc15 WU-136.2 Mahmmud Tarzi 104,000.00$ 94,819.02$ AFA 4,740,951.00 N N MOE NCB RCC M/s Mashoor CC16 WU-139 Barak Nika 78,000.00$ 156,000.00$ 45,909.11$ AFA 2,288,569.00 N N MOE NCB RCC Noor Hami co17 WU-140 Madrasa Deni 78,000.00$ 47,779.73$ AFA 2,381,819.00 N N MOE NCB RCC Arian Mutalid c.c18 WU-141 Maulawi Abdul Waseh 64,000.00$ 128,000.00$ 60,011.12$ N N MOE NCB RCC New BoostConstruction Compjany19 WU-141.1 Baba Wali Saib 64,000.00$ 60,023.16$ N N MOE NCB RCC New BoostConstruction Compjany20 WU-142 Madrasa Deni 78,000.00$ 78,000.00$ 61,741.92$ AFA 3,087,096.00 N N MOE NCB RCC Ms/ Habeeb Bashar CC

21WU-143 H. Jamal Karz/Shin ghazi baba high

school64,000.00$ 64,000.00$

60,716.26$ AFA 3035813N N

MOENCB

RCCNew BoostConstruction Compjany

22 WU-144 Bala Zhara 78,000.00$ 78,000.00$ 61,766.71$ N N MOE NCB RCC Al Hudq Nazif cons.companySub Total 2,656,000.00$ -$

List of Schools of Kandahar

Shifted from EQUIP I/ Planed for 1389WU-136

Dollars AfghanisExpected Bid opening date

Date of Delivery/ Completion

S. No.Responsible Agency

Package No

Name of School Estimated Cost in USD

EstimatedTotal Package

cost

Actual lot price

Revised Estimated Cost in USD

Planned/Actual Date

Name of Supplier/ Contractor/ Domestic Preference

IDA Prior Review (Y/N)

Type of Construction

No. of Classrooms to be built

Type of Contract

1 NCB 30 Babaji School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-20112 NCB 30.1 Qarghab Sofla School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-20113 NCB 30.2 Qarghab School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011

Sub Total 384,000.00$ -$

- WU-150 Darul Ulum School -$ -$ $ 113,600.54 5,680,027 N N MOE NCB Dropped due to land problemSub Total -$ -$

1 NCB 40 Baba Hotak High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed2 NCB 40.1 Babagak Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed3 NCB 40.2 Zarghona Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed

Sub Total 384,000.00$ -$

1 NCB 50 Darulom Islami 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed2 NCB 50.1 Hayat baba High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed

3 NCB 50.2Shaheed Payenda Mohammad Khan High

128,000.00$ 128,000.00$ N NMOE

8 NCB RCC10-Aug-2010 10-Aug-2011

New Project Purposed

Sub Total 384,000.00$ -$

177 Total 20,076,347.40$ 6,304,000.00$

177 Grand Total 26,380,347.40$

List of Schools of Zabul

Hilmand Province 11 Urban Schools

List of Schools of Paktika

List of Schools of Faryab

New Projects Purposed

Contract Signing/ Actual

Date of Contract Signing

Date of Delivery/

Completion

1 2 3 4 5 6 7 8 9 10 11 12

1 WP13 Construction of Nangarhar PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I

Not Contracted 1389

2 WP15 Construction of Takhar PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I

Not Contracted 1389

3 WP16 Construction of Ghazni PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I

Not Contracted 1389

4 WP21 Construction of Ghor PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I

Not Contracted 1389

5 WP22 Construction of Qunduz PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I

Not Contracted 1389

6 WP25 Construction of Bamyan PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 31-Jul-011Shifted from EQUIP I

Not Contracted 1389

7 WP31 Constrution of Noristan PED Building 1 130,000.00$ 130,000.00$ NCB N 1-Aug-10 31-Jul-011Shifted from EQUIP I

On Going 1389

8 WP30 Construction of Daikundi PED Building 1 130,000.00$ 130,000.00$ NCB N 1-Aug-10 31-Jul-011Shifted from EQUIP I

On Going 1389

8 1,040,005.00$ 1,160,006.00$

IDA Prior Review (Y/N)

Planned/Actual Date

Name of Supplier/ Contractor/

Progress of Procurement as

of

To be Completed in

Revised Estimated cost

Procedure/ Method

Total

Estimated Cost OR Actual Contract

Price (with contract currency)

S. No.Contract Package Number1

Name of Contract (Brief Description)

Quantity/ Number

Contract Signing/

Actual Date

Date of Delivery/

Completion 1 2 3 4 5 6 7 8 9 10 11 12 13

1 CC 1.1 Chalatak Primary School Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC 1.2 Quritu Murghab 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC 1.3 Zadmard Primary School Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 1.4 Safidalak Primary School Abkamari 4 -$ Dropped as Built by PRT4 CC 1.4 Chasme gulshah Ghurmach 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above5 CC 1.5 Gudar Primary School Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

6 CC 1.6Najak Lalmey Primary School

Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

7 CC 1.7 Shorak Primary School Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 1.8 Shewdan Primary School Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 1.9

Dara-e-Tabar Primary School

Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 1.10Shar Share Chaman Qadas -$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Dropped due to security reasons11 CC1.10 Idgah qalae-i-nav 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 New Project Purposed12 CC 1.11Rubat Primary School Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

13 CC 1.12Ghaibali Dasht Girls Primary School

Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

14 CC 1.13Chaprodha Girls Primary School

Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

- CC 1.14Charkhab Primary School Murghab -$ Dropped due to security reasons15 CC 1.14Buyae Zardalugak Murghab 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed16 CC 1.15Lalah bai Primary School Jwand 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 1.16

Takht-e-Zard Primary School

Jwand 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 1.17

Tagab-e-Alam Primary School

Jwand 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 1.18Dahistan Primary School Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

20 CC 1.19Chashma-e-Sunjid Primary School

Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

21 CC 1.20Qarqach Kandlan Primary School

Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10

- CC 1.21Aab- Barik Murghab 6 -$ Dropped due to security reasons22 CC 1.21Mangan Murghab 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 New Project Purposed23 CC 1.22Dawary / Qadis Khordak Murghab 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 Name of the school changed24 CC 1.23Naswane Kapa Baba Murghab 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1025 CC 1.24Khanaqa Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1026 CC 1.25Aab Jaal/Chilanak Jwand 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 Name of the school changed27 CC 1.26Naswane Dahak Qadis 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1028 CC 1.27Naswane senjedak Muqur 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1029 CC 1.28Jare Shorab Qadis 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1030 CC 1.29Joe Ganj 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1031 CC 1.30Aka Zai Girls School Balamurghab 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10

1,200,000.00$

Name of School Estimated cost in USD IDA Prior Review (Y/N)

Planned/Actual Date

Type of ContractResponsible

Agency

Sub Total

Ref.NoNo. of Classrooms to be built

CommentsS. No. Type of ConstructionLocation (District)

List of t Schools of Badghis Province

1 CC 2.1 Markaze Kaldar Kaldar 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC 2.2 Shangal Abad Dawlat Abad 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC 2.3 Paikan dara Sholgar 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-104 CC 2.4 Kashanda Sufla Kushenda 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-105 CC 2.5 Qala-e-Razaq Chemtal 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-106 CC 2.6 Ota qul Nahr-e-Shahi 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-107 CC 2.7 Maulawi Rahmatullah Kushinda 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 2.8 Abdul Qader Khumi Mazar-e-sharif 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 2.9 Dewali maidan Balkh 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

10 CC 2.10Rahman Baba Charbolak 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 2.11Tangi girls school Khulm 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 2.12Buzarigh Shor Tepa 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 2.13Khasa Puz Dehdadi 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 2.14Woljatu khulm 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 2.15Shurarq Shor Tepa 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 2.16Mahmoudia Chahr Kant 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 2.17Abdulgan Zaari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 2.18Abuzar ghafari Zaari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 2.19Dahanu girls Khulm 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 2.20Naswan School Kaldar 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 2.21surkh kocha Charkent 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 2.22Naswane Tukhta Dehdadi 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 2.23Bibi Khadija Sholgar 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 2.24Hayatan Chahi 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 2.25Sayed Qasim Mohammadi Zari 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 2.26Abo Ismat Marmal Marmal 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 2.27Naward kotgai Balkh 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-1028 CC 2.28Marifat High School Mazar-e-Sharif 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-1029 CC 2.29Charsang Girls High Schol Center 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

30 CC 2.30Khoshal Khan Midle School Charbolak 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

31 CC 2.31Block 5 Primary School Center 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed32 CC 2.32Qarye Shahidan School Kholum 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

33 CC 2.33Sayed Ismayel Balkhi SchoolBalkh 10 100,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,628,000.00$ Sub Total

List of t Schools of Balkh Province

- CC 3.1 Maroof Girls School Yakaw Lang 4 -$ Dropped due to security reasons

1 CC 3.1 Lycee markazi yak awlang Yakaw Lang 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed

2 CC 3.2 Siya Bomak middle Yakaw Lang 4 -$ Dropped due to security reasons3 CC 3.2 Daga Schooll Yakaw Lang 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed4 CC 3.3 Shina Akhdarat Girls School Panjab 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-105 CC 3.4 Godar Girls School Panjab 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-106 CC 3.5 Targhai girls School Panjab 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-107 CC 3.6 Kundok Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 3.7 Safid ghare ulya School Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 3.8 Qolba-Tu Girls School Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 3.9 Warezagh School Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 3.10Chartaq School Kohmard 4 32,000.00$ IBEEM Roofing with GI Sheet cc N MoE 15-Aug-08 15-Jul-1012 CC 3.11Do Abi girl School Shebar 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 3.12Baghak girls School Shebar 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 3.13 Sayed Baba Seghan 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 3.14Solej Boys Yakaw Lang 6 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 3.15Zardsang High School Panjab 6 -$ Dropped due to security reasons

16 CC 3.15Turbalaq Panjab 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed17 CC 3.16Pachandor Olya School Waras 6 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 3.17Bayani Girls School Seghan 6 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 3.18Khushkak School Shebar 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 3.19Cheraghan School Saighan 5 40,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 3.20Du- Ruy School Kohmard 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 3.21Naswane chijan Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 3.22Darae Chasht Yakaw Lang 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 3.23Sarmqul Yakaw Lang 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 3.24Sachak Girls high School Yakaw Lang 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 3.25Sachak Boys High School Yakaw Lang 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 3.26Payan Bagh Girls School Kohmard 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1028 CC 3.27Samara School Center 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC 3.28Surkhboom Kerman Panjab 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 3.29Dahane qalacha Panjab 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 3.30Chuye taman Waras 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1032 CC3.31 Zokor Ajar Kahmard 4 44,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1033 CC 3.31Doshakh Girls School Pomar 4 44,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed34 CC3.32 Sare Murghi Girls School Yakwlang 8 88,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed35 CC 3.32Qara ghajor School Waras 8 88,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed36 CC3.33 Eg Primary School Waras 8 88,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,576,000.00$

List of Schools of Bamyan Province

Sub Total

1 CC 4.1 Lesa Khohan girls (khohan) Khohan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

- CC 4.2 Saeedan High School Khohan 8 -$ Dropped due to security reasons2 CC 4.2 Roinzar school Khohan 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed3 CC 4.3 Naswan-e-Esmati Khash 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-104 CC 4.4 Zarak Middle School Daraiem 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

5 CC 4.5 Hazara Qadam middle SchoolArgo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

6 CC 4.6 Yakh Daru middle School Ashkashem 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-107 CC 4.7 Lesa Abo Taleha girls Shohada 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 4.8 Lesa Khohan (khohan) Khohan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 4.9 Sail Dahan high School Khohan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 4.10Rahan Yawan Ragh 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 4.11Kazda Wardoj 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 4.12Kalar Raghestan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 4.13Naswan Zebak Zaybak 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 4.14Baharstan Baharak 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 4.15Nashur Koof 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 4.16Shahran girls High School Kash 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 4.17Murghak Middle School Arghanchkhoa 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

18 CC 4.18Bajawar Javed high school Sheghnan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

19 CC 4.19Fetrat high school Mayami 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 4.20Ubaghan girls school Shiki 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 4.21Skazar Girls School Keran-menjan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 4.22Anjuman Primary Keran-menjan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 4.23Barragh High School kohistan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 4.24darululume Argo Argo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 4.25Darululum Tashkan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 4.26Jayru ulya Khohan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 4.27Naswan-e-Dorkhan Khash 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1028 CC 4.28Gardang Shar-e-bozork 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC 4.29Gohar Yamgan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 4.30Ayeena Poshta Khor Tashkan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 4.31Chang-e-Bala Jurm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1032 CC 4.32Langar primery Yaftal-e-Payan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1033 CC 4.33Sasht primery School Wakhan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

34 CC 4.34Khambak-e-bala primery School

Tagab-e-Kishm 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

35 CC 4.35Haft Chinar primery school Kishm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1036 CC 4.36Deh Sangan Jurm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1037 CC 4.37kaj Dara Nasi 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1038 CC 4.38Sare hawz Jurm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1039 CC 4.39Kanderim Raghestan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1040 CC 4.40Pater Raghestan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1041 CC 4.41Sabet High School Daraiem 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1042 CC 4.42Gandom Qul Kishm 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1043 CC 4.43Naswane Ganda Cheshma Argo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

44 CC 4.44Attachment of Faramand Shaheed Girls

Argo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

45 CC 4.45Bede Kalan Middle School Hamagan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

46 CC 4.46Charmaghz Dara Girls SchoolKishm 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

47 CC 4.47Nasir Khesraw High School Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1048 CC 4.48Fatimatul Zahra Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1049 CC 4.49Erghisk primary School Yamgan 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1050 CC 4.50Nalwech Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 4.51Khwary Yamgan 8 -$ Dropped due to security reasons

51 CC 4.51Sarab jOkhan Yamgan 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed52 CC 4.52Shinam Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1053 CC 4.53Ghurmi Yamgan 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1054 CC 4.54Rahe dodara Raghestan 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1055 CC 4.55Zulazma Raghestan 6 66,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1056 CC 4.56moosa khan shahid wakhan 4 60,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1057 CC 4.57Karzai School wakhan 4 60,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

58 CC 4.58Yabab Jurm 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10Project name has been changed from Ghiasi high school to Yabab Midle School

59 CC 4.59Kata wa Qazi Daraiem 6 66,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10Project name has been changed from Yalani to Kata wa Qazi

60 CC 4.60Simorgh Midle School Share Bozorugh 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed61 CC 4.61Spin Girls High School Yaftale Payan 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed62 CC 4.62Darulom Khash Khash 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

3,748,000.00$

List of schools of Badakhshan Province

Sub Total

1 CC 5.1 Markaze Quchin Qi School Eshtarli 6 $ 48,000.00 I-Beam Roofing CC N MoE 15-Aug-08 15-Jul-102 CC 5.2 Sarneli Girls Middle School Center 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

3 CC 5.3 Baghban Girls Middle School Kajran 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

4 CC 5.4Haftad Nafar Boys Middle School

Kajran 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

5 CC 5.5 Barlan Girls Middle School Shahrastan 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC 5.6 Sangan Boys High School Meeramor 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 5.7 Askan Girls High School Meeramor 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC 5.8 Sar Dara Khodi High School Khadeer 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

9 CC 5.9 Dahan-e-Barghas High School Sang Takht 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

10 CC 5.10Kiso Girls High School Keti 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

11 CC 5.11Khakbarak Boys High School Sang Takht 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

12 CC 5.12Tagab Boys High School Meeramor 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 5.13Naglaj Boys High School Eshtarli 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 5.14Shelan High School Eshtarli 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 5.15Ushu Girls Shahrastan 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 5.16Mesh Boys Middle School Center 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 5.17Gerd girls Middle School Shahrastan 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 5.18Sulbi Middle School Meeramor 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 5.19Jangalak Shahrastan 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 5.20monmae Keti 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 5.21Hushi Keti 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 5.22Immam Sadeq Sang Takht 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 5.23Sang Chelak Khadeer 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 5.24Naswane Miramor Meeramor 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 5.25Zakure Burlan Shahrastan 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 5.26Naswane Shah joe Kajran 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 5.27Naswane Sheikh Miran Eshtarli 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC 5.28Burger High School Meeramor 12 $ 96,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

29 CC 5.29Khadeer Central High school Khadeer 8 $ 64,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

30 CC 5.30Royan Girls High School Keti 10 $ 80,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 5.31Qul Qadeer Center 8 $ 64,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC 5.32Sayed Jamaluddin Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1033 CC 5.33Husaini Fakhor Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1034 CC 5.34Sartagab Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1035 CC 5.35Sheran Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1036 CC 5.36Serenj Fakhor Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1037 CC 5.37Fatima Wageer Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1038 CC 5.38Zainabia Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1039 CC 5.39Roqya Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1040 CC 5.40Shiran Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1041 CC 5.41Tagabdar Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1042 CC 5.42Beri Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

43 CC 5.43Warsal Rebad Girls High School

Miramor 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

44 CC 5.44Kaiso Central High School Keti 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed45 CC 5.45Sewook Shibar Boys School Center 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed46 CC 5.46Largar Boys High School Shahristan 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed47 CC 5.47Tagab Girls High School Miramor 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

2,368,000.00$

- CC 6.1 Milni Primary School Geeru 4 -$ Dropped due to security reasons1 CC 6.1 dehyak Primary school Dehdadi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed2 CC 6.2 said Ahmad haludal Jaghuri 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-103 CC 6.3 Khwaja Ali Middle Qarabagh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC 6.4 Dari Zabanha Maqur 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC 6.5 Jaka Pashi Malistan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC 6.6 Langarkhail Baba Ajeeristan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 6.7 Patap Gailan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC 6.8 Imam Hussain Kurmurda Nahur 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.9 Malik ibne-Qais Gairu 4 -$ Dropped due to security reasons9 CC 6.9 Parwar dar school Qarabagh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed- CC 6.10 Siaqul Zankhan 5 -$ Dropped due to security reasons

10 CC 6.10 Ansari andar 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed11 CC 6.11 Said Jamaludin Barjagi Nahur 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 6.12 Sanayi Rashidan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Number of classes increased

13 CC 6.13Shaheed Abd.Qayum Surkhak

Waghaz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

- CC 6.14 ubaidullah Landakhail Aabe Band 5 -$ Dropped due to security reasons14 CC 6.14 shahid Abdul Matin Dheyak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed

List of schools of Daikundi Province

Sub TotalList of Schools of Ghazni Province

15 CC 6.15 Ulya Sarab Jaghatu 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.16 Malikdin Nawa 5 -$ Dropped due to security reasons

16 CC 6.16 aghujan Geilan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed17 CC 6.17 Pirykhail Ajeeristan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 6.18 Mawlana Abdul Hai Waghaz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 6.19 Larga Maqur 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 6.20 Mirwal Qarabagh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 6.21 Halyatu Shughla Girls Jaghori 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 6.22 Shaheed Faiz Malistan 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.23 Sarab Ulya Nahure 10 -$ Dropped due to security reasons

23 CC 6.23 Namian Qule shutornurda Nahure 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed24 CC 6.24 Naswane Maknak Malistan 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 6.25 Lahl Big High School Nahure 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 6.26 hujat Ibne hassan Jaghuri 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.27 Ayqulak Jaghuri 8 -$ Dropped due to security reasons

27 CC 6.27 nani School andar 9 72,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed28 CC 6.28 Khairu Madares Dheyak 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC 6.29 Naswane khaza ali Center 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 6.30 Kalai qazi Center 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 6.31 Malistan Girls High School Malistan 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,544,000.00$ Sub Total

1 CC 7.1 Garmab High School Lal Sar Jangule 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC 7.2 Zarni High School Tiorah 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-103 CC 7.3 Deh Khwaja Middle School Pasaband 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC 7.4 Oshan Middle School Shahrak 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

5 CC 7.5 Taht-e-Shahrak Middle SchoolShahrak 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

6 CC 7.6 Dai Primary School Tolak 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 7.7 Gharak Primary School Dawlatia 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC 7.8 Qala-e-Gohar High School Chahar Sada 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC 7.9 Tail Bai Nazar School Dawlat Yar 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 7.10Dehad Middle School Dawlat Yar 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

11 CC 7.11Shah Sangan Middle School Pasaband 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

12 CC 7.12That-e-Markaze Tolak High School

Tolak 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

- CC 7.13Khwaja Mohammad Ganjan Middle School

Tiorah 5 -$ Dropped due to community problem

13 CC 7.13Dahane sare sabad Tiorah 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school14 CC 7.14Dehtali High School Tiorah 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 7.15Allah Yar High Schhool Dawlat Yar 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

16 CC 7.16Karman dashte Safarak MiddleLal Sar Jangule 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

- CC 7.17Payae Hesar Tayura 4 -$ dropped due to security problem17 CC 7.17Zardbead Tayura 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school18 CC 7.18Pay Tab Tayura 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 7.19Khair Nak Saghar 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 7.20That-e Markaz Dawlanya Dawlanya 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 7.21Khwajagan Dawlanya 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 7.22Deh Haji Chahar Sada 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 7.23Naswane Talmistan Pasaband 4 -$ Dropped as it is built by NADERA

23 CC 7.23Roof Pasaband 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC 7.24Naswane Safidbuz Pasaband 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 7.25Tahaab Tulak 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 7.26Samuchak Teyora 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 7.27Dawlat Yar High School Dawlat Yar 10 80,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 7.28Barah Khana Middle School Dawlat Yar 8 -$ Dropped as it is built by world vision

28 CC 7.28Noor ahmed shahid Chekh-Charan 8 64,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school29 CC 7.29Shuraba Chekh-Charan 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 increase in number fo classrooms30 CC 7.30miyan Tagab Ghalmin Chekh-Charan 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 7.31Dahoor Chekh-Charan 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC 7.32attachmnet of Garmba schoollal Sar Jangule12 10 100,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1033 CC7.33

attachment of SHURABA school

Chekh-Charan 6 60,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1034 CC 7.33Qalai Jaka Primary School Dawlat Yar 8 80,000.00$ Ibeem Roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,408,000.00$

List of Schools of Ghor Provice

Sub Total

1 CC8.1 Sar koroh Primary School Shindand 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC8.2 Asfarza Primary School Oba 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-103 CC8.3 Khwaja Malal Primary School

Kushk Rubat-e-Sang

4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC8.4 Kariz Elyas- Dahanae ZulfiqarGulran 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC8.5

Bai Mohammad Primary School

Kohsan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC8.6 Chauni Masjid Primary School Karukh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC8.7 Do Ab Middle School Farsi 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC8.8 Margha Primary School Chasht-e-Sharif 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC8.9 Urayan Shindand 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC8.10 Abgazasht Primary School Kush Kuhna 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1011 CC8.11

Zinda Chashm Girls Primary School

Kush Kuhna 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC8.12

Jafar Baik Khurasani Primary School

Kushk Rubat-e-Sang

6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC8.13 Shakar Ab Primary School Gulran 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

14 CC8.14 Nayeb Ghafor Primary School Kohsan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

15 CC8.15 Mamora Primary School Pashtoon Zarghoon 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC8.16 Joy Naw Primary School Pashtoon Zarghoon 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1017 CC8.17 Khwaja Noh Shindand 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

18 CC8.18 Kareez Padah Primary School Zinda Jan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

19 CC8.19 Karizak Shindand 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC8.20 Gaw Siya Zinda Jan 6 -$ Dropped due to community problem

20 CC8.20 naswane kabuthat khan Zinda Jan 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school- CC8.21 Kapak Mayan Zinda Jan 6 -$ Dropped due to community problem

21 CC8.21 San jab Zinda Jan 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school22 CC8.22 Deh Minar Zinda Jan 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC8.23 Qalae Turkman Zinda Jan 6 -$ Dropped due to community problem

23 CC8.23 Siya aab Zinda Jan 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC8.24 Deh Gorgan Primary School Ghoryan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC8.25 Chajat Adraskan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC8.26 Dara Jamal Keshke Kuhna 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC8.27 Naswane Peshakan Pashtoon Zarghun 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC8.28 Kamana Kuhsan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1029 CC8.29 Aabe Safid Gulran 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1030 CC8.30 Qalae Sharbat Kurkh 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC8.31 Khame Muzafar Shindand 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC8.32 Ajreen

Keshk Rubate Sangeen

8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1033 CC8.33 Qaraqul Injil 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1034 CC8.34 Gardab Injil 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1035 CC8.35 naswane nawbadan Injil 8 -$ Dropped due to community problem- CC8.35 Naw badam Injil 9 72,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

36 CC8.36 Sahar Khaiz Injil 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1037 CC8.37 Naswane arzaqi Guzara 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1038 CC8.38 Kabisae Farah Siya wasashanGuzara 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC8.39

Qalae Bakhtyari kalatae Behbud

Guzara 6 -$ Dropped due to community problem39 CC8.39 Madarasea ziaratjah Guzara 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school40 CC8.40 palawanha Karukh 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1041 CC8.41 Naswane dahanae ghar Karukh 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1042 CC8.42 lycee yadgar Zinda Jan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1043 CC8.43 Bazemchi Zinda Jan 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1044 CC8.44 Jafar Baik Kohdani

Koshke Rubate Sangi

8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1045 CC8.45 Khwaja Ubaidullah Herary Injil 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1046 CC8.46 humesh Adraskan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1047 CC8.47 Zardalugak Adraskan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1048 CC8.48 ziayarat primary Adraskan 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1049 CC8.49 Bande Benafsh Obe 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1050 CC8.50 Esfarza Obe 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1051 CC8.51 saripul Obe 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1052 CC8.52 shaid momand Injil 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

2,776,000.00$

List of Schools of Hirat Province

Sub Total

1 CC 9.1 Bedak Middle School Baraki Barak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC 9.2 Hisarak High School Center 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

3 CC 9.3Hawas Khails Girls Primary school

Baraki Barak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

4 CC 9.4 Paspajak Pingram Charkh 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC 9.5 Mirwal School Center 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC 9.6 Dasht-e-Bahari School Center 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 9.7 Gozi Middle School Mohammad Agha 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-108 CC 9.8 Topak School Baraki Barak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-109 CC 9.9 Kharoti School Charkh 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 9.10Malakai School Charkh 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 9.11Raham Abad Middle School Mohammad Agha 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 9.12Cheltan Middle School Baraki Barak 6 48,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 9.13Babri girls high school Baraki Barak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 9.14Qalae Shaki girls school Baraki Barak 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 9.15Malik tooth school Mohammad Agha 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 9.16Jauzare altamoor school Pule alam 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 9.17Ashnapoor Ashnapoor 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 9.18Qasim khail Azru 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 9.19Takhtak pingaram takhtak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 9.20Garmaba garmaba 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 9.21faiz Kariz school padkhab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 9.22Qala-e-Sare Sanng Center 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 9.23Bibi Malalai School Mohammad Agha 6 -$ Droppedas it’s built by community members

23 CC 9.23sare aabparam Mohammad Agha 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC 9.24Khoshi High School Khoshi 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 9.25Ghazi Khalil Azru 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 9.26Ibrahim Khail School Baraki Barak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 9.27Musa Khan School Hazra 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

28 CC 9.28Attachment; Zarghon Shahr High School

Mohammad Agha 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

29 CC 9.29Usman Khail Azru 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 9.30Naw Shahr School Charkh 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 9.31Haji Gardai Kochai Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

32 CC 9.32Sayed Hussain Kamidan Girls School

Center 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

33 CC 9.33Haji Badur School Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed34 CC 9.34Ab bazak Girls School Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

35 CC 9.35Shaheed Engr. Ahmad Shah School

Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,664,000.00$

List of Schools of Logar Province

Sub Total

1 CC10.1 Kharoti Girls Middle school Jalrez 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

2 CC10.2Ghazi Mohammad Afzal Primary School

Jaghato 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

3 CC10.3 Dahan Hesar Primary School Hesa Awal 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

4 CC10.4 Bi Bi Hajera Primary School Markaz-e-Behsood 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC10.5 Resalat Primary School Markaz-e-Behsood 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC10.6 Joqol girls Middle School Narkh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

7 CC10.7 Shohadai Abdara High School Sayed Abad 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

8 CC10.8Hazrat-e-Omar Farooq Primary School

Jaghato 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

9 CC10.9Wahdat Dewlan Middle School

Jalrez 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

10 CC10.10Shaheed Shirzad Chak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

11 CC10.11Haidari Baghlan Middle School

Chak 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

12 CC10.12Abdul Mahiyuddin High School

Sayed Abad 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

13 CC10.13Shaheed Ali Raza Primary School

Daimird 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

14 CC10.14Tezak Primary School Hesa Awal 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

15 CC10.15Raqul Behsud 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

16 CC10.16Qazi Gul Mohammad Shaheed Middle School

Narkh 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

17 CC10.17Taitamor Middle School Narkh 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

18 CC10.18Dabkazar High School Chak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

19 CC10.19Ghazi Esmatuulah Daimird 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

20 CC10.20Alisha Chak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

21 CC10.21Deh kherqa Primary Narkh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

22 CC10.22Chugh hura Narkh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

23 CC10.23Bibi Fatima Primary Chak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

24 CC10.24Awra Primary Sayed Abad 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

25 CC10.25Shaheed Ahmadshah PrimaryJaghato 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

26 CC10.26Inqelab Primary Daimird 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

27 CC10.27Sharhe Niru Primary hesa Awal Behsud 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

28 CC10.28Siya Qoot Primary Center of Behsud 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

29 CC10.29Khatamul Anbiya Middle Center of Behsud 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

30 CC10.30Khalid Bine Walid maidan Shahr 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

31 CC10.31aqcha primary Narkh 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

32 CC10.32Shaheed Izatullah School Sayed Abad 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

33 CC10.33Do Aab Helmand Primary School

Behsud 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

34 CC10.34Mami Khail girls School Center 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10

35 CC10.35Amar Baba Girls Middle Center 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10

36 CC10.36Aab Kazar High School chak 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

37 CC10.37Sang Shanda High school Behsud 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

38 CC10.38Attachment of Raqul Behsud 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

- CC10.39Unkhi High School Sayed Abad 10 -$ Changed to NCB

40 CC10.40Shikh Abad High School Sayed Abad 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

List of Schools of Maidan Wardak Province

41 CC10.41Shahadat High School Chak 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

42 CC10.42Bid Mushk Khudai Nazar Midle School

Jaghato 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

43 CC10.43Badam Dara Primary SchoolSayed Abad 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,980,000.00$ Sub Total

1 11.1Mohammdi Saibzada High School

Behsood 8 64,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE 01-Aug-08 15-Jul-10

2 11.2 Trelai School 8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed3 11.3 Gandomak School 8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed

4 11.4Qalai Muqam Khan Girls School

8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed

5 11.5 Afghan Mena School 8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed

384,000.00$

1 CC12.1 Rooqyan School Aryoub Jaji 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC12.2 Shakar Khail School Gardiz 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10- CC12.3 Fatih Khail School Zurmat 4 -$ Dropped due to community problem3 CC12.3 Kal a niazi gardiz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school4 CC12.4 zandi Khail School Ahmad Abah 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC12.5 Charago Kelay School Laja Mangal 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.6 Sultan Khail Primary School Kardah Heeri 4 -$ Dropped due to community problem6 CC12.6 zahu school Gardiz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school7 CC12.7 Khwaja Hasan School Gardiz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC12.8 Moshka School Ahmad Khail 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC12.9 Matwarakh School Butan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC12.10Garami School Chamkani 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1011 CC12.11Darka School Chamkani 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC12.12Rubat School Jani Khail 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.13Gerda serai Gerda Serai 5 -$ Dropped due to community problem

13 CC12.13mari Khail school Aryoub Jaji 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school14 CC12.14Qala-e-Sharif High School Aryoub Jaji 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC12.15Banuzai Middle Gardiz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC12.16Rubat School Gardiz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1017 CC12.17Darul Hefaz Hazrate Bilal Gardiz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

- CC12.18Balk Khail middle school Jani Khail 6 -$ Dropped due to community problem

18 CC12.18Muti school Ahmad Khail 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

19 CC12.19Orgul middle school Chamkani 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.20Karezgai Primary Gerda Serai 4 -$ Dropped due to community problem

20 CC12.20kariz school Said Karam 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

21 CC12.21Hazar Dara middle School Jaji 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

22 CC12.22Akhund khail primary Ahmad Abah 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.23Shahree Changa School Zurmat 10 -$ Dropped due to community problem

23 CC12.23Andowan high school Said Karam 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC12.24Jehad Kalay School Sayed Karam 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.25Gul Ghundi High School Aryoub Jaji 10 -$ Dropped due to community problem

25 CC12.25Karez primary school Said Karam 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school26 CC12.26Khailan High School Said Karam 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC12.27Naswane Rude Ahmadzai Ahmad Abah 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC12.28Machal Gho Girls School Ahmad Abah 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed29 CC12.29Dawlat Zai School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed30 CC12.30Ahmad Khil Midle School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed31 CC12.31Nargisi School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed32 CC12.32Qalai Mahmod School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed33 CC12.33Ibrahim Khil Girls School Center 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed34 CC12.34Kata Khil Girls School Jaji Ayob 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,784,000.00$

List of schools of Paktia Province

List of Schools of Nangrahar

Sub Total

Sub Total

1 CC13.1 Korabah Middle School Shatal 5 45,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC13.2 Faraj High School Anaba 5 -$ Dropped due to land problem2 CC13.2 Par shahar Anaba 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project3 CC13.3 Kar Abdara Primary School Anaba 6 54,000.00$ CC N MoE 15-Aug-08 15-Jul-104 CC13.4 Badqol Girls Middle School Center 5 70,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10

5 CC13.5Ayesha Seddiqa No. 1 Primary School

Said Karam 5 70,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10

6 CC13.6 Paranda Primary School Center 5 70,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10- CC13.7 Tankhu Dara 4 -$ Dropped due to land problem7 CC13.7 Khaja Primary Dara 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

8 CC13.8 Astana Kalan Primary School Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

9 CC13.9 Naswane umarz Dara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

10 CC13.10Royedae Shatal Shatal 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

11 CC13.11Bibi Ayesha Seddiqa No. 2 Primary School

Rakhah 5 45,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

- CC13.12Khawaja Arif Primary School Paryan 5 -$ Ibeem roofing with GI Sheet Dropped as it is already built by PRT

12 shalkacha Paryan 5 45,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

13 CC13.13Faraj High School Anaba 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

14 CC13.14Zamankor Primary School Anaba 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

15 CC13.15Naswane Abdullah Khail Dara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

16 CC13.16Massoud Shaheed Hissa Awal 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

17 CC13.17Abd.Wadood Shaheed MiddleDara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

18 CC13.18Astana Kalan Middle School Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

19 CC13.19Tariq Bin Ziyad Dara 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

20 CC13.20Jamal warda Primary Rakhah 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

21 CC13.21Madrase Dinee Dara Roy Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

22 CC13.22Naswane Tamina Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

23 CC13.23Naswane Tankhu Dara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work

- CC13.24Perengal/Pasgaran Dara 4 32,000.00$ Dropped as it is already built by PRT

- CC13.25Gulabuddin Shaheed High School

Shatal 8 -$ Dropped as it is already built by PRT

24 CC13.25Madrase dini Shatal 8 64,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

- CC13.26Malak Mirza Shaheed High School

Dara 10 -$ Dropped as it is already built by PRT

25 CC13.26Kharau Girls Hissa Awal 10 80,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school

- CC13.27Baba Ali Girls Primary School Dara 10 80,000.00$ Dropped as it is already built by PRT

26 CC13.28Sang Gana Girls high SchoolCenter 8 64,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10

27 CC13.29Madrasae Abu-Hanifa Paryan 8 64,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10

28 CC13.30Unaba high School Unaba 10 80,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10

29 CC13.31Piawasht School Roofing -$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10 Dropped (Build by other source)

1,611,000.00$ Sub Total

List of schools of Panjsher Province

1 CC14.1 Yakhdara Siah Gard 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC14.2 Bibi Sangari Girls School Center 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-103 CC14.3 Sardara Girls School Shinwari 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC14.4 Khak-e-Ghulam Ali Shiekh Ali 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC14.5 Joqol School Shiekh Ali 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC14.6 Dahan-e-Rubat Girls School Shiekh Ali 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC14.7 Shaheed Haqbeen Surkh Parsa 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC14.8 Dawlat khani Girls School Surkh Parsa 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC14.9 Shamal Khail Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC14.10Sharkai Girls School Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1011 CC14.11Durrani Girls School Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC14.12Numan Khail Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC14.13Chap Qol Primary School Jabal Saraj 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1014 CC14.14Babah Khail Girls School Center 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC14.15Siyatank Koh-e-Safi 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC14.16Angur Dara Koh-e-Safi 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC14.17Mandi Qul Koh-e-Safi 6 -$ Dropped as built by PRT

17 CC14.17Naswane Mandi Qul Koh-e-Safi 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school18 CC14.18Qalae Bayazid Bagram 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC14.19Qalae Zhala Bagram 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC14.20Ro Aaab Salang 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC14.21Salah Khan Salang 4 -$ Dropped as the school is not a formal School

21 CC14.21KHWAJA Shahwali Salang 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school22 CC14.22Baba khail Ghorband 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1023 CC14.23Ghambaki Ghorband 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1024 CC14.24Khakrez Middle School Surkh Parsa 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC14.25Naswane Dahane Khakrez Surkh Parsa 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC14.26Yakh Dara Ghorband 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC14.27Madrase qamchaq Surkh Parsa 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC14.28Zakhure qutondar Ghorband 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1029 CC14.29Sahadat charikar 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1030 CC14.30madrase haqan ia shaikali 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC14.31Madrase saranwal hujat Surkh Parsa 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC14.32Gunbad darae quli baheer Shinware 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

33 CC14.33Madrsae Maulawi yar Mahamud

Shinware 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10

34 CC14.34Kuhnadeh shinware 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1035 CC14.35Madrasae Haqania sheikh Ali 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1036 CC14.36Sadat Primary Charikar 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC14.37Saranwal Hujat Surkhe Parsa 6 -$ Dropped due to land problem

37 CC14.38Neyazi School Bagram 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed38 CC14.39Sofi Khil School Shinwari 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed39 CC14.40Shikhan Midle School Kohe Safi 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed40 CC14.41Wazghar High School Sia Gerd 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed41 CC14.42Samanderya High School Sia Gerd 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed42 CC14.43Numanya Ashtar Kheel Shinwari 8 80,000.00$ Ibeem roofing with GI sheet N MoE Sep-10 Sep-11 New Project Purposed

2,116,000.00$

List of Schools of Parwan province

Sub Total

1 CC26.1 Farashqan Kalan School Sancharak 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC26.2 Qazaq Malak School Sozma Qala 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC26.3 Jarghan School Kohistan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC26.4 Angushta School Siad 8 -$ Dropped as built by UNICEF4 CC26.4 SHAMAKAI charas School Kohistan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school5 CC26.5 Korak Saripul 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-106 CC26.6 Pushtae Ali Saripul 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-107 CC26.7 Naswane Angute Uzbakia Saripul 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-108 CC26.8 Baghawi Olya Midle School Center 8 80,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-109 CC26.9 Shakh Dara Balkhab Balkhab 4 40,000.00$ RCC CC N MoE Sep-10 Sep-11 New Project Purposed

10 CC26.10Kharkhash Midle School Center 8 80,000.00$ RCC CC N MoE Sep-10 Sep-11 New Project Purposed11 CC26.11Yolturab School Gosfandi 8 80,000.00$ RCC CC N MoE Sep-10 Sep-11 New Project Purposed12 CC26.12Mirza walang School 12,000.00$ Last installment to be paid13 CC26.13 tholo School 18,000.00$ Last installment to be paid14 CC26.14Shaheed Safdari School 12,000.00$ Last installment to be paid

792,000.00$

1 CC16.1 Katak Jar Middle School Katak Jar 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC16.2 Qara Tapa Primary School Qara Tapa 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC16.3 Chaila Primary School Chailah 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-104 CC16.4 Bashir Abad Middle School Center 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-105 CC16.5 Tarma Bhai Primary School Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

6 CC16.6 Khwaja Khalil Primary School Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

7 CC16.7 Yak Zarang Primary School Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

8 CC16.8Shorcha Markaz Primary School

Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

9 CC16.9Hazrat-e-Usman Middle School

Bad Guzar 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

10 CC16.10Tabatash Chapdarah Rustaq 12 96,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC16.11Ishan abad Yangi qala 12 96,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC16.12Punbak School Chal 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC16.13Hazrate zaid School Rustaq 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1014 CC16.14Mansoore Shaheed Bangi 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC16.15Maulawi Mahammud Nazar warih 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC16.16Tashbolaq School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed17 CC16.17Shosh Dara Primary School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed18 CC16.18Kabir Shaheed School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed19 CC16.19Ghulam Hazrat School Warsaj 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed20 CC16.20Chegam Primary School Center 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed21 CC16.21No 1 Girl High School Rostaq 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed22 CC16.22Omar Farooq High School Rostaq 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed23 CC16.23Namakab High School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed

1,480,000.00$

Sub Total

List of schools of Sar-e-Pol Province

List of Schools of Takhar Province

Sub Total

1 CC17.1 Deh Yahya High School Deh Sabz 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-102 CC17.2 Tara Khail High School Deh Sabz 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

3 CC17.3Abdul jan shaheed High School

Paghman 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

4 CC17.4Deh Araban Qargha High School

Paghman 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

5 CC17.5 Boya Zar Nasiri High School Shakardara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-106 CC17.6 Danishmand High School Shakardara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

7 CC17.7 Hazrat-e-Osman High School Shakardara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

- CC17.8Deh Kalan Mosahi High School

Mosahi 8 -$ Dropped as it is already built by PRT

8 Mosahi sufla School Mosahi 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school9 CC17.9 Alokhail Middle School Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1010 CC17.10Habib Jan Shaheed Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

11 CC17.11Haji Shamalai Khan Shaheed (Newly Established)

Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

12 CC17.12Haji Zafran (Newly Established)

Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

13 CC17.13Botkhak High School Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1014 CC17.14Karanda Girls School Kalakan 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1015 CC17.15Abdul Rahman Baba Qarabagh 10 100,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1016 CC17.16Bustan Farza 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1017 CC17.17Guldara Girls Guldara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

18 CC17.18Ghulam Haider Shaheed Primary School

Istalif 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

19 CC17.19Qolchaq Primary School Mir Bachakot 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1020 CC17.20Wyar Ahmadzai Bagrami 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1021 CC17.21Karizmir Girls School Shakardara 5 50,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1022 CC17.22Shamsul- Madares Shakardara 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1023 CC17.23Madrasae Muskinya Farza 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1024 CC17.24Yakhdand Primary Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1025 CC17.25Tehzine Ulya Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1026 CC17.26Naswane Daku Mir Bachakot 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10- CC17.27Dabilli Sarobi -$ Dropped asit is not a formal School

27 CC17.27In zerai Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school- CC17.28Loy kelai Sarobi -$ Dropped asit is not a formal School

28 CC17.28waka Khas Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school- CC17.29Zarandai Kas -$ Dropped asit is not a formal School

29 CC17.29Sezelai Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school30 CC17.30Mainz Ghundi Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10- CC17.31Marwasa -$ Dropped asit is not a formal School

31 CC17.31Shurab Chashhma Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school- CC17.32Tu Tu Kas -$ 15-Jul-10 Dropped asit is not a formal School

32 CC17.32Sapar abdullah zai Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school33 CC17.32Omarzai Girls School Shakar dara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

34 CC17.32Qalai Wazir Girls High SchoolBagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

35 CC17.32Baba Qashqar Girls Primary School

Deh Sabz 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

36 CC17.32Madrasa Sarenwal Janatgul Bagrami 10 100,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed37 CC17.32Koshkak Boys, Girls School Paghman 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

2,410,000.00$

List of Schools of Kabul Province

Sub Total

1 CC18.1 Char Qala Primary School Narang 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-102 CC18.2 Tango Primary School Sarkani 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-103 CC18.3 Zor Barol High School Dangam 10 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-104 CC18.4 Barikot Girls Primary School Nari 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-105 CC18.5 Muhabat Kalay High School Dara-e-Pech 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-106 CC18.6 Barchaki Primary School Asad Abad 6 $ 84,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-107 CC18.7 Bargame Wasat Nari 12 $ 96,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10- CC18.8 Qalauna primery 8 $ - CC N MoE completed8 CC18.9 Darul uleme Chawki chawki 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-109 CC18.10Shikhan Midle School Center 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

10 CC18.11Kochyan oh Bila School Sarkani 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed11 CC18.12Nangalam Girls School Darai Pich 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed12 CC18.13Shegai Primary School Usmar 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed13 CC18.14Belai Primary School Sawkai 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed14 CC18.15Chiragul School $ 12,000.00 Ibeem roofing with GI Sheet Last installment to be paid15 CC18.16Degal School $ 12,000.00 Ibeem roofing with GI Sheet Last installment to be paid16 CC18.17Shinkorak School $ 22,000.00 Ibeem roofing with GI Sheet Last installment to be paid17 CC18.18Andar Lachak $ 12,000.00 Ibeem roofing with GI Sheet Last installment to be paid18 CC18.19Bithal $ 80,000.00 Ibeem roofing with GI Sheet Last installment to be paid

996,000.00$

1 CC19.1Qara Yoot Onchi Primary Schhool

Darzab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-10

2 CC19.2 Qarastoon Primary School Darzab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-103 CC19.3 Peer Gharab Primary School Darzab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-104 CC19.4 Tash Akhor Primary School Qosh Tepa 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-105 CC19.5 Cheghar Girls High School Mangjak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-106 CC19.6 Shakar Qol Primary School Qarqeen 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-107 CC19.7 Qarqeen girls Primary School Khamab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-108 CC19.8 Khamab High School 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-109 CC19.9 Safar Kol Primary School Aqcha 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1010 CC19.10Alkarbat Primary School Mardyan 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1011 CC19.11Chelak Ganj Middle School Darzab 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1012 CC19.12Aq Bolaq Primary School Qosh Tepa 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1013 CC19.13Naswane Arabha Qosh Tepa 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1014 CC19.14Abas girls Primary School Mangjak 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1015 CC19.15Qazan Naro Primary School Faizabad 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1016 CC19.16Niswaney haider abad Aqcha 6 48,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1017 CC19.17Beljah abdul rahman Mangjak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1018 CC19.18Niswaney sheshah khanah Faizabad 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1019 CC19.19Niswaney khan aqa Qush Tepa 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1020 CC19.20Bala Mardyan High School Faizabad 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-10

21 CC19.21Shah Saleem Baba Middle Schhool

Faizabad 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-10

22 CC19.22Shahr-e-Kohna High School Aqcha 10 80,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1023 CC19.23Umar Khan High School Aqcha 10 80,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1024 CC19.24Khanqah High School Khanqah 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1025 CC19.25Khan aqaey sagharan Sheberghan 6 84,000.00$ RCC CC N MoE 01-Aug-08 15-Jul-1026 CC19.26Manguti Primary School Sheberghan 5 70,000.00$ RCC CC N MoE 01-Aug-08 15-Jul-1027 CC19.27Chokanah Darz Aab 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1028 CC19.28Niswaney darz aab Darz Aab 12 96,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1029 CC19.29Kochi Hai Qarawol School Faizabad 8 80,000.00$ Ibeem roofing with IG Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed30 CC19.30Qazal Qeshlaq Girls School Darzab 8 80,000.00$ Ibeem roofing with IG Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed31 CC19.31Sardari Girls School Darzab 8 80,000.00$ Ibeem roofing with IG Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed

1,642,000.00$

List of Schools of Kunar Province

List of Schools of Jozjan Province

Sub Total

Sub Total

- CC20.1Allah Mohammad Shahid Middle School

Center 6 -$ Dropped as it is already built by PRT

1 CC20.1 Hazrath e khalid school Center 6 84,000.00$ RCC CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school

2 CC20.2Daulat Mohammad Shah Middle School

Najrab 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

3 CC20.3Abdul Saboor Shaheed Middle School

Najrab 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

4 CC20.4 Ghulam Mustafa Hisa 2 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-105 CC20.5 Abdul Rashid School Najrab 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-106 CC20.6 Ghazi khankhail Tagab 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-107 CC20.7 Said Aqa Alah Sai 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-108 CC20.8 Hayatullah Alah Sai 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-109 CC20.9 Hamidul madares Tagab 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1010 CC20.10Abu Zar ghafari Najrab 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1011 CC20.11Fatul madares Najrab 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1012 CC20.12Madrasae Khal Mohammad Kohband 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1013 CC20.13Salman Farsi Hisa 2 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1014 CC20.14Faiza Tagab 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1015 CC20.15Abdul Manan Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1016 CC20.16Delyar Girls Middle School Najrab 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1017 CC20.17Sultan Khail Middle School Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1018 CC20.18Haq Parast Middle school Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1019 CC20.19Naswane Qala Khan Najrab 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1020 CC20.20Mawlana Abd.Zahir Hisa Awal Kohistan 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1021 CC20.21Naswane Darae kalan Najrab 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1022 CC20.22Naswane mir Ahmad Alah Sai 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1023 CC20.23Hassan Abad middle Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1024 CC20.24Naswane Shirak Pirak hisa 2 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

25 CC20.25Niak Mohammad Shaheed School

Najrab 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10

1,508,000.00$

1 CC21.01Feroza Gai Zaranj 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-102 CC21.02Naswane Markaz Primary Zaranj 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-103 CC21.03Danu Gadal Chaqansur 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Jul-104 CC21.04Sistan Middle School Khashrud 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Jul-10

5 CC21.05Shaheed Gul Mohammad School

Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

6 CC21.06Farkhi School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed7 CC21.07De Morda School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

8 CC21.08Kanak Din Mohammad SchoolCenter 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed

9 CC21.09Shaheed Habib School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed688,000.00$ Sub Total

Sub Total

List of Schools of Kapisa Province

List of Schools of Nemroz Province

- CC22.01Mandighar girls Kamdish 6 -$ Dropped due to security reasons1 CC22.01Zakure tetin NoorGram 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project- CC22.02Samarbagh Kamdish 4 -$ Dropped due to security reasons2 CC22.02shtwi girls school parun 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project3 CC22.03Kutya Kamdish 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.04Pule-rustam Kamdish 4 -$ Droppeddue to security reasons4 CC22.04Pashki girls school parun 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project5 CC22.05Gadhwal Mandul 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.06Abzuk Bargimatal 4 -$ Dropped.security reasons6 CC22.06Wamae qadeem Primary wama 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project- CC22.07Dewana-baba Bargimatal 4 -$ Dropped due to security reasons7 CC22.07mashpa primary school NoorGram 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project8 CC22.08Darulhulume Bargimatal Bargimatal 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.09Wadahu NoorGram 5 -$ Built by other source9 Arnas Girls school waigal 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school10 CC22.10Shuk boys school Dawaba 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.11kulam girls Dawaba 5 -$ Dropped due to security reasons

11 CC22.11Nashi gram girls school waigal 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school- CC22.12Suna Gala Nari 5 -$ Ibeem roofing with GI Sheet Dropped due to security reasons- CC22.13Sawu Primery Nari 4 -$ Ibeem roofing with GI Sheet Dropped due to security reasons

12 CC22.14Hamshoz Midle School Waigal 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed13 CC22.15Darul Ulom Waigal Arnas Waigal 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed14 CC22.16Waigal Girls High School Waigal 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed15 CC22.17Jonia Primary School Do Aab 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed16 CC22.18Kolum Girls Midle School Do Aab 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed17 CC22.19Nilab Primary School doab 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid18 CC22.20Piar Girls School doab 23,986.56$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid19 CC22.21Pala Gal School doab 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid20 CC22.22Jonia School doab 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid21 CC22.23Kolam School doab 2,313.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid22 CC22.24Pashgar Girls School NoorGram 5,513.76$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid23 CC22.25Mashook Malik School NoorGram 5,513.81$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid24 CC22.26Kultan/Takra School NoorGram 5,513.81$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid25 CC22.27Mandil/Malil School NoorGram 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid26 CC22.28Shakoorzada School Mandol 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid27 CC22.29Karach School Mandol 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid28 CC22.30Mandool School Mandol 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid

$ 824,000.00

1 CC23.01Saalabe Ulya Alingar 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-May 15-Jul-102 CC23.02Salar Sofla Alingar 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed3 CC23.03Karanj Primary School Mehtarlam 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed

4 CC23.04Shaheed Mohammad Ismal Tariq High School

Alingar 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed

5 CC23.05Char Bagh Girls Prmary School

Qarghayee 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed

6 CC23.06Manjan Primary School Ali Shang 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed7 CC23.07Abi Now Primary School Alingar 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed

$ 528,000.00

List of Schools of Laghman Province

List of Schools of Nooristan Province

Sub Total

Sub Total

1 CC24.01Tarinkoot madrasa Terinkoot 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC24.02Chorah madrasa Chorah 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC24.03Deh raward Madrasa Dehrawood 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC24.04Gazab Madrasa Gizab 8 -$ Dropped due to security reasons4 CC24.04Kata khanjak Madrasa Terinkoot 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above5 CC24.05Kahs urozgan Madrasa khas Urozgan 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

6 CC24.06Char chena Madrasa school charchina 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

7 CC24.07Chenarto Madrasa school chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC24.08Sar chakhli Boys Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC24.09Sar chakhli Girls Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10

10 CC24.10Sadmardah Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC24.11Dehjawz Barakzai Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC24.12Sarkhum-e- sufla Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC24.13Jangi karez Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC24.14Malezi Sufla Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC24.15Kochian Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1016 CC24.16To To Sufla Dehrawood 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC24.17Durji Dehrawood 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC24.18Mukhtalat Now abad Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC24.19sar kila chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC24.20Pay kila chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC24.21Sery School chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC24.22Naw abad kochyan Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC24.23Qala Rag chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC24.24Wacha wyala Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC24.25Sarchina Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC24.26Abe-e- Ulya Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC24.27Kalily chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1028 CC24.28Kotal Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC24.29Kuhna Qala-e- Ulia chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC24.30Zerkoh chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC24.31Kawrai chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1032 CC24.32Siyah Ghar chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1033 CC24.33Chorah high School Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1034 CC24.34Jangi Karez Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1035 CC24.35Shin Ghula Dehrawood 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1036 CC24.36Sahoor School Gizab 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed37 CC24.37Qarya Shiwak School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed38 CC24.38Shah Hussain School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed39 CC24.39Sorkh Murghab School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed40 CC24.40Abas Ali School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed41 CC24.41Garmab Sufla School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid42 CC24.42Babur Quli School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid43 CC24.43Thori School Terinkoot 19,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid44 CC24.44Charamgar Girls School Terinkoot 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid45 CC24.45Sinan School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid46 CC24.46Shnaqala School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid47 CC24.47Sajawal School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid48 CC24.48Sadmurda School Terinkoot 48,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid49 CC24.49Nawabad Salambaba SchoolTerinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid50 CC24.50Safid Khar School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid

51 CC24.51Haramshah / Mianghar SchoolTerinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid

52 CC24.52Sabzabad/Patan School Terinkoot 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid53 CC24.53Wani/Hisar School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid54 CC24.54Seyaghar School Chinarthu 48,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid55 CC24.55Chalbi School Chinarthu 48,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid56 CC24.56Chinarthu High School Chinarthu 36,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid57 CC24.57Ishfiluq School Chinarthu 10,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid58 CC24.58Sakzai School Dehrawood 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid59 CC24.59Seyasang School Dehrawood 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid60 CC24.60Sharthughii School Dehrawood 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid61 CC24.61Warjan School Dehrawood 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid62 CC24.62Kamkooch School Dehrawood 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid63 CC24.63Mazar School Dehrawood 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid

3,195,000.00$

List of Schools Of Urozgan Province

Sub Total

1 CC25.1 Peer Md. Kakar high School Zhelae 10 $ 80,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10- CC25.2 Wahab Zai Zhelae 6 $ - Dropped due to security reasons2 CC25.2 Haji Abdul Hanif Zhelae 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above- CC25.3 Pashmul Zhelae 6 $ - Dropped due to security reasons3 CC25.3 Pashmul Primary Zhelae 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above4 CC25.4 shaheedan Ghundai Zhelae 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-105 CC25.5 Madrasae Dinee Zhelae 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10- CC25.6 zala khan primary Panjwai 8 $ - Dropped due to security reasons6 CC25.6 Salehan primary school Panjwai 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above- CC25.7 Talu kan Panjwai 6 $ - Dropped due to security reasons7 CC25.7 shaik kqalandar baba Panjwai 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above- CC25.8 Badizoy Chel Ghor Panjwai 6 $ - Dropped due to security reasons8 CC25.8 Naswane shahrak Panjwai 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above9 CC25.9 Ghaibana Baba Panjwai 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-101 CC25.10Timor Shahi High School Center 3,636.00$ Rehabilitation CC N MoE Rehabilitation2 CC25.11Sofi Sahib Girls High School Center 12,005.00$ Rehabilitation CC N MoE Rehabilitation

3 CC25.12Mahmood Hotaki Middle School

Center 2,755.00$ Rehabilitation CC N MoE Rehabilitation

4 CC25.13Zarghuna Ana Middle SchoolCenter 2,578.00$ Rehabilitation CC N MoE Rehabilitation

5 CC25.14Ahmad Shahi Middle School Center 10,854.00$ Rehabilitation CC N MoE Rehabilitation

6 CC25.15Aino Middle School Center 7,267.00$ Rehabilitation CC N MoE Rehabilitation7 CC25.16Nisaji High School Center 16,337.00$ Rehabilitation CC N MoE Rehabilitation8 CC25.17Azimullah Shaheed School Center 5,841.00$ Rehabilitation CC N MoE Rehabilitation9 CC25.18Joe Lahore School Arghandab 5 40,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

10 CC25.19Mullah Mohammad Akbar School

Boldak 5 40,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

11 CC25.20Malak Wazir School Boldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

12 CC25.21Mahmood Jalali Deni MadrasaBoldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

13 CC25.22Ali Nika Wish School Boldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138914 CC25.23Abdul Jabar Khan School Boldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138915 CC25.24Hasan Zoe School Takhtapul 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138916 CC25.25Shir Aka Primary School Takhtapul 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138917 CC25.26Farmi Tarnak School Daman 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138918 CC25.27Khoshab School Daman 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

19 CC25.28Shinghazi Baba High Schoolcenter 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

20 CC25.29Zarghuna Ana Middle SchoolCenter 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

21 CC25.30Kaka Sayed Ahmad School Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

22 CC25.31Mashriqi/Sofi Sahib Girls High School

Center 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

23 CC25.32Faqiranu Kalay/Khalid Bin Walid School

center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

24 CC25.33Piru Kalacha School Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138925 CC25.34Nisaji/Jaikan School Daman 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

26 CC25.35Hazrat Bilal/Shaheed Sardar M. Dawood School

Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

27 CC25.36Gariwal School Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

28 CC25.37Haji Arab/Kotal Morcha School

Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

29 CC25.38Zarghuna Ana Middle SchoolCenter 2 16,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

30 CC25.39Seyori School Nish 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138931 CC25.40Bagh Agha School Nish 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

$ 1,517,273.00

List of Schools Of Kandahar Province

Sub Total

1 CC 26.1Dare Ashraf doshi 10 $ 100,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10

2 CC 26.2Attachment of Abdul Razaq Shaheed

6 $ 60,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

3 CC 26.3Speen Joomat Central Baghlan 6 $ 60,000.00 Ibeem Roofing with GI Sheet Oct-10 Oct-11 New Project Purposed5 CC 26.4Abdul Qadir Akhunzada 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

$ 268,000.00

1 CC 27.1Ghali Khana boys School Doshi 8 $ 88,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC 27.2Toop Khana Qala 8 $ 88,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC 27.3Dahan Dara Gilam Baf 6 $ 66,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed4 CC 27.4Qarayee Boys 8 $ 88,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

$ 330,000.00

1 CC 28.1Pashto Zhbe School Center 12 $ 96,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed2 CC 28.2Merman Nazo Qesm Awal Center 12 $ 96,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC 28.3Sabzgazi School Join Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid4 CC 28.4Chargook Girls School Join Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid5 CC 28.5Qooch Primary School Join Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid6 CC 28.6Nawbar School Pushti Kooh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid7 CC 28.7King School Anardara Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid8 CC 28.8Shashak Girls School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid9 CC 28.9Panjla School center Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid

10 CC 28.10Qalai Mohammad School center Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid11 CC 28.11Ilyas Abad School center Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid12 CC 28.12Boomadiha School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid13 CC 28.13Gink School Pushti Kooh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid14 CC 28.14Chahi Zandan School Pushti Kooh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid15 CC 28.15Farib Girls School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid16 CC 28.16Jorak School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid17 CC 28.17Luftan Girls School joen Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid18 CC 28.18Panjdeh School joen Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid19 CC 28.19Gurgak School anardara Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid20 CC 28.20Kalathi Alam Khan School Anardara Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid21 CC 28.21Dehzak School bala balook Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid22 CC 28.22Pio Pasab School bala balook Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid23 CC 28.23Nang Abad School Khak Safid Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid24 CC 28.24Islamabad School Khak Safid Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid25 CC 28.25Larwand School Purchaman Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid26 CC 28.26Sarmushkan School Purchaman Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid27 CC 28.27Faizabad School Gulistan Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid28 CC 28.28Larthi School Gulistan Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid29 CC 28.29Ghazi Abad School Bakwa Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid30 CC 28.30Shagai School Bakwa Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid31 CC 28.31Kariz Surkha School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid

653,364.00$

1 CC 29.1 Degan Midle School Ismayel Khil 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

2 CC 29.2 Shamal Piran High School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

3 CC 29.3 Maton School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project PurposedSub Total 240,000.00$

1 CC 30.1 Ariana School 4 30,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for13892 CC 30.2 Qari Abdullah 4 40,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for13893 CC 30.3 Rabia Balkhi Girls School 17,771.00$ Rehabilitation CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for13894 CC 30.4 Qari Abdullah -$ 2nd Building Rehabilitation CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389

87,771.00$ Sub Total

List of Schools of Kabul City Province

List of Schools of Khost Province

461,364.00$

Sub Total

Sub Total

Sub Total

List of Schools of Baghlan Province

List of Schools of Faryab Province

List of Schools of Farah Province

1 CC.31.1 Khwaja Boland School Aybak 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed2 CC.31.2 Abohanifa High School Dare Sorkh Payan 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC.31.3 Chardi Primary School Dare Sorkh Bala 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

4 CC.31.4Abkhorak Ulia Primary School

Roy do aab 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

5 CC.31.5 Galwan Sai Primary School Dare Soof 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

6 CC.31.6 Paytangi School Roy do aab 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

7 CC.31.7 Karte Mamorin Girls School Markaz 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

500,000.00$

1 CC 32.1Wazir Mohammad Gul Khan School

Archee 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

2 CC 32.2 Kharoti School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC 32.3 Alchin Midle School Imam Sahib 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed

240,000.00$

1 CC 33.1Karthi Mamorin Girls School

Lashkargah 12,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

2 CC 33.2Karthi Mamorin Boys School

Lashkargah 12,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

3 CC 33.3 Karthi Bolan Lashkargah 16,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

4 CC 33.4 Ahli Hanood Safian Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

5 CC 33.5 Dashthi Bolan Boys School Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

6 CC 33.6 C1 Karthi Lagan Lashkargah 12,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

7 CC 33.7Abul Fathhi Boosthi Middle School

Girashk 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

8 CC 33.8 Boolan Markazi School Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

9 CC 33.9 Hazrat Hamza School Girashk 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

10 CC 33.10C1 Karthi Lagan Lashkargah 16,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

11 CC 33.11Nawamish Baghran School Baghrab 16,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

12 CC 33.12Lashkari Bazar Gharbi School

Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid

132,000.00$ 857 43,818,408.00$

Sub TotalList of Schools of Kundoz Province

List of Schools of Samangan Province

Grand Total:

Sub TotalList of Schools of Hilmand Province

Contract Signing/ Actual Date of Contract Signing

Date of Completion

1 2 3 4 5 6 7 8 09-Jan-00 10-Jan-00 11 12 13

1 T1MOE Head of Departments Trainings, Bangaladish

12 $0.00 $0.00 Y 07-Feb-07 30,Jan,08 NA NA Dropped

2 T2 Provincail Trainings 8 $244,725.00 $50,000.00 Y 07-Feb-07 30-Jan-08 NA NAPartially taken place.Details under Compilation

3 T3TED Preparation Training for (India Scholarship Candidates)@419$

204 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped

4 T4Teacher Training upgrading from Grad-12 to Grad-14@100$

10’000 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped

5 T5Teacher Training upgrading to Grad-12@50$

10’000 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped

6 T6 Teacher Training InSet1 Roll Out @65$ 30’000 $1,950,000.00 $232,000.00 Y 01-Feb-07 01-Feb-08 NA NACommittedin bothEquip I and Equip II

7 T7 Teacher Training Scholarship@6615$ 400 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped

8 T 8Training for procurement officers of MOE at ASCI,INDIA or any other reputed institute

4 $18,000 $0 N 01-Apr-09 31-Dec-10 NA NA

9 T9 SMC Training 22750 $377,650 $0 Y 10-Aug-10 09-Aug-11 NA NA New Training Proposed

10 T10Provincial Social Mobilization Staff Training

210 $104,760 $0 N 10-Aug-10 09-Aug-11 NA NA New Training Proposed

11 T11Provincial Monitoring & Evaluation Staff Training

1158 $110,010 $0 N 10-Sep-10 09-Sep-11 NA NA New Training Proposed

12 T12 Trainning inside the country for EMIS Staff 5 $7,500 $0 N 10-Sep-10 09-Sep-11 NA NA New Training Proposed

$2,812,645.00 $282,000.00

Name of Contract (Brief Description)IDA Prior Review (Y/N)

Name of Consultant

Grand Total:

Trainings

SL No.Contract Package Number*

Remarks

Planned/Actual Date

Qty OriginallyEstimated Cost

Procedure/ Method

Progress of Procurement as of

Actuals

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

1 2 3 4 5 6 7 8 9 10 11 12 13

1 TE51.1 Senior DT3 Coordinator 8 $128,000.00 $0.00 IC Y 01-Aug-10 31-Mar-11 Vacant N/A

already existing in equip II

2 TE51.2 Senior DT3 Manager 12 $48,000.00 $48,000.00 IC N 21-Mar-10 20-Mar-10Mohammidi gul

Wahidi N/A

already existing in equip II

3 TE51.3 Senior DT3 Manager 12 $48,000.00

$0.00

IC N 01-Jul-10 30-Jun-11 Vacant N/A

already existing in equip II

4 TE51.4 DT3 Technical Advisor 8 $80,000.00

$0.00

IC Y 01-Jul-10 31-Mar-11 Vacant N/A

already existing in equip II

5 TE51.5 DT3 Finance & Admin Officer12 $24,000.00

$0.00

IC N 21-Mar-10 20-Mar-10 Vacant N/A

already existing in equip II

6 TE51.6 DT3 Monitoring Officer 12 $24,000.00

$0.00

IC N 01-Jul-10 30-Jun-11 Vacant N/A

already existing in equip II

7 TE51.7 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Nasrullah N/A

already existing in equip II

8 TE51.8 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Seema N/A

already existing in equip II

9 TE51.9 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Kanishka Shabi N/A

already existing in equip II

10 TE51.10 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Shah Piray N/A

already existing in equip II

11 TE51.11 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ghulam Rabani N/A

already existing in equip II

12 TE51.12 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abdul Aziz N/A

already existing in equip II

13 TE51.13 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Enayatullah

Zaland N/A

already existing in equip II

14 TE51.14 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Sardar Hussian N/A

already existing in equip II

15 TE51.15 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Sherzaman

Abasin N/A

already existing in equip II

16 TE51.16 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Najibullah N/A

already existing in equip II

17 TE51.17 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ali Shah N/A

already existing in equip II

18 TE51.18 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Mohammad Arif N/A

already existing in equip II

19 TE51.19 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Allah

Mohammad N/A

already existing in equip II

20 TE51.20 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Gul Kaarim N/A

already existing in equip II

Remarks

Progress of Procurement as

of

Name of Consultant

In-Service Section (DT3 Program)

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

21 TE51.21 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ghoshma Gul N/A

already existing in equip II

22 TE51.22 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad

Alim N/A

already existing in equip II

23 TE51.23 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Shah

Mohammad N/A

already existing in equip II

24 TE51.24 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad

Hussain Rahimi N/A

already existing in equip II

25 TE51.25 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Sayed Rahim N/A

already existing in equip II

26 TE51.26 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Saif Ul Rahman N/A

already existing in equip II

27 TE51.27 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Besmillah Abid N/A

already existing in equip II

28 TE51.28 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad

Qahir N/A

already existing in equip II

29 TE51.29 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Habib

Sharanwal N/A

already existing in equip II

30 TE51.30 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Shamsull Habib N/A

already existing in equip II

31 TE51.31 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Soorgul Mosadiq N/A

already existing in equip II

32 TE51.32 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Palwasha N/A

already existing in equip II

33 TE51.33 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abdul Saboor N/A

already existing in equip II

34 TE51.34 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad

Shafi Stanikzi N/A

already existing in equip II

35 TE51.35 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ahmad Sharif N/A

already existing in equip II

36 TE51.36 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abd Safdar N/A

already existing in equip II

37 TE51.37 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Fazal Rahman N/A

already existing in equip II

38 TE51.38 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Pir Mohammad N/A

already existing in equip II

39 TE51.39 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abd Haq N/A

already existing in equip II

40 TE51.40 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abd Raqib N/A

already existing in equip II

41 TE51.41 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Wazir Gul N/A

already existing in equip II

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

42 TE51.42 DT3 Database Officer 12 $18,000.00 $18,000.00 IC N 21-Mar-10 20-Mar-10 Sadaqat Ali N/A

already existing in equip II

43 TE51.43 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Mustafa N/A

already existing in equip II

44 TE51.44 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Hamid Rehman N/A

already existing in equip II

45 TE51.45 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Sebghatullah N/A

already existing in equip II

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

46 TE51.46 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Mustafa N/A

already existing in equip II

47 TE51.47 DT3 IT Officer 12 $18,000.00 $18,000.00 IC N 21-Mar-10 20-Mar-10Fareedullah

Kharotai N/A

already existing in equip II

48 TE51.48 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Besmillah N/A

already existing in equip II

49 TE51.49 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Gul Rahman N/A

already existing in equip II

50 TE51.50 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Imaduddin N/A

already existing in equip II

51 TE51.51 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Waisuddin N/A

already existing in equip II

52 TE51.52 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Said Abdul

Salam N/A

already existing in equip II

53 TE51.53 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abdul Matin N/A

already existing in equip II

54 TE51.54 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Solaiman N/A

already existing in equip II

55 TE51.55 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Sharifuddin N/A

already existing in equip II

56 TE51.56 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 vacant N/A

already existing in equip II

57 TE51.57 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Rahimullah N/A

already existing in equip II

58 TE51.58 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 fayaz N/A

already existing in equip II

59 TE51.59 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10M. Qayoum

Bahir N/A

already existing in equip II

60 TE51.60 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Zubair N/A

already existing in equip II

61 TE51.61 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10Said Khalid

Ahmad N/A

already existing in equip II

62 TE51.62 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Hazar Gul N/A

already existing in equip II

63 TE51.63 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10Nangyaly Hashimi N/A

already existing in equip II

64 TE51.64 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Fazal Akbar N/A

already existing in equip II

65 TE51.65 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

66 TE51.66 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

67 TE51.67 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

68 TE51.68 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

69 TE51.69 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

70 TE51.70 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

71 TE51.71 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

72 TE51.72 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

73 TE51.73 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

74 TE51.74 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

75 TE51.75 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

76 TE51.76 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

77 TE51.77 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

78 TE51.78 DT3 Data Entry Technician 9 $4,500.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

79 TE51.79 Executive Assistant 9 $10,800.00

$0.00

IC N 01-Jul-10 31-Mar-11 Newly proposed

Newly proposed and approved by

WB

Subtotal: $878,200.00 $500,400.00

Pre-Service Section

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

80 TE52.1 Senior Manager 12 $48,000.00 $40,800.00 IC N 21-Mar-10 20-Mar-11abdul haq rahmati N/A

already existing in equip II

81 TE52.2 Senior Manager Scholarships12 $48,000.00 39600 IC N 01-Feb-10 31-Jan-11gul agha ahmadi N/A

already existing in equip II

82 TE52.3 TTC Development Officer 12 $24,000.00 24000 IC N 14-Dec-09 13-Dec-10 abdul wahab N/A

already existing in equip II

12 $0.00 0 IC N 01-Apr-09 31-Mar-10

already existing in equip II

12 $24,000.00 $16,800.00 IC N 01-Apr-10 31-Mar-11

already existing in equip II

$144,000.00 $121,200.00

84 TE52.5 Curriculum & Standard Development Senior Manager12 $48,000.00

$0.00

IC N 01-Jul-10 30-Jun-11 Vacant N/A

already existing in equip II

85 TE52.6 Curriculum Advisor 12 $196,000.00

$0.00

IC Y 01-Jul-10 30-Jun-11 Vacant N/A

already existing in equip II

86 TE52.7 Research Officer 12 $24,000.00

$0.00

IC N 01-Jul-10 30-Jun-11 Vacant N/A

already existing in equip II

87 TE52.8

Snr. Technical Advisor 12

$196,000.00 $196,000.00

IC

Y 01-Jul-10 31-Mar-11

Amir mohammad

Mansory N/A

already existing in equip II

$464,000.00 $196,000.00

88 TE53.1 Institute Senior Manager 12 $48,000.00

$0.00

IC N 01-Jul-10 30-Jun-11 Vacant N/A

already existing in equip II

$48,000.00 $0.00

89 TE54.1 Computer Operator 12 $6,000 $6,000

IC

N 21-Mar-10 20-Mar-11 Toryalai N/A

already existing in equip II

90 TE54.2 Computer Operator 12 $12,000 $12,000

IC

N 21-Mar-10 20-Mar-11Mirwais Rasouly N/A

already existing in equip II

91 TE54.3 IT Incharge Officer 12 $17,280 $17,280

IC

N 21-Mar-10 20-Mar-11 Ahmad Samim N/A

already existing in equip II

92 TE54.4 Admin/Logistic Officer 12 $17,280

$0.00 IC

N 21-Mar-10 20-Mar-11 Vacant N/A

already existing in equip II

93 TE54.5 Senior procurement officer(at MOE)6 $12,000 $12,000

IC

N 21-Mar-10 15-Sep-10 Matin rasoly N/A

already existing in equip II

94 TE54.6 Procurement Assistant(at MOE)9 $9,000 $9,000

IC

N 21-Mar-10 31-Dec-10 Parviz Samah

already existing in equip II

95 TE54.7 Translator(English-Dari)for Procurement(MOE)6 $24,000 $24,000

IC

N 21-Mar-10 14-Aug-10 Fahim N/A

already existing in equip II

96 TE54.8 Administrative Assistant for Procurement (MOE)9 $24,000 $24,000

IC

N 21-Mar-10 07-Oct-10 Maisara N/A

already existing in equip II

$121,560 $104,280

83

General Services

National Teacher Traninig Institute (NTTI)

Distance Education Officer

Subtotal:

Subtotal:

TE52.4sifatullah saboon N/A

Curriculum & Standards

Subtotal:

Subtotal:

EMIS Development Requirements

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

97 TE55.1 Sr. EMIS advisor 9 $54,000

$0.00

IC Y 01-Jul-10 31-Mar-11 Vacant N/A

already existing in equip II

01-Jan-09 31-Mar-10

already existing in

01-Apr-10 31-Mar-11

already existing in

99 TE55.3 System Developer 11 22000 22000

IC

Y 25-Apr-10 31-Mar-11Mohammad

Ilyas N/A

already existing in equip II

100 TE55.4 Database developers and Programmer10 $22,500 $22,500

IC

Y 10-May-10 31-Mar-11Mirwais

Ahmadzai N/A

already existing in equip II

TE55.5 Database developers and Programmer9 $27,000

IC

Y 01-Jul-10 31-Mar-11 Vacant N/A

already existing in equip II

$156,700 $75,700

101 TE56.1.Sr. Network Administrator 11 $26,840.00 $26,840.00

IC Y 01-May-10 31-Mar-11 Ahmad Shah N/A

already existing in equip II

102 TE56.2.Sr. Database Administrator 10 $24,000.00

$0.00 IC N 01-Jul-10 31-april-11 Vacant N/A

already existing in equip II

103 TE56.3Sr. Technician 10 $14,400.00

$0.00 IC N 01-Jul-10 31-april-11 Vacant N/A

already existing in equip II

104 TE56.4Hardware Technician 12 $17,280.00 $17,280.00

IC N 21-Mar-10 20-Mar-11Mohammad

Shafi N/A

already existing in equip II

$82,520.00 $44,120.00

11 $0.00 $0.00 01-Apr-05 28-Feb-06Mohammad

QaderiN/A

12 $0.00 $0.00 01-Jun-06 31-May-07

18 $0.00 $0.00 01-Jun-07 30-Jun-08

24 $0.00 $0.00 01-Jul-08 26-Jul-08

18 $0.00 $0.00 06-Jan-09 05-Jul-10Shafiq Ahmad

Qarizada

10 $67,000.00 $0.00 01-Jun-10 31-Mar-11 vacant shifted from equip I

13 $0.00 $0.00 01-Jun-05 30-Jun-06

6 $0.00 $0.00 01-Jul-06 31-Dec-06

12 $0.00 $0.00 3-Jun-07 2-Jun-08

6 Months

& 28 Days

$0.00 $0.00 3-Jun-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

10 $14,400.00 $0.00 01-Jun-10 31-Mar-11 vacant shifted from equip I

13 $0.00 $0.00 01-Jun-05 30-Jun-06

4 $0.00 $0.00 01-Jul-06 31-Oct-06

8 $0.00 $0.00 05-Nov-06 30-Jun-07Nadia Sahar

Sidiqi5

Months & 7

Days

$0.00 $0.00 24-Sep-07 28-Feb-08 Matin Rasuly

12 $0.00 $0.00 01-Mar-08 28-Feb-09 Matin Rasuly

12 Months $0.00 $0.00 01-Jan-09 31-Dec-09 Abbas Khan

98 TE55.2 System Analyst

EQUIP Coordinator

$31,200 $31,200

S1.1

Mohammad Salim

Qayum

N

Naveed Bakhshi

N/A

YIC

N/A

Mohammad Ashoor Sabori

Procurement Officer

IC

Finance Officer (Replacement)

IC

N

S1.3

S1.2

Financial Management Specialist Ziaulhaq Safi

N/A

N/A

105

106

107

Subtotal:

Subtotal:

12 IC YHameedullah

Sherani N/A

ICT MANAGEMENT UNIT TEAM

EQUIP CORE TEAM IN THE CENTER

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10 Abbas Khan

10

$18,480.00

$0.00 01-May-10 31-Mar-11 Zubair shifted from equip I

13 $0.00 $0.00 09-Jun-05 30-Jun-06

11 $0.00 $0.00 01-Jul-06 31-May-07

1 $0.00 $0.00 01-Jun-07 30-Jun-07

17 $0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$18,876.00 $18,876.00

01-Apr-10 31-Mar-11 shifted from equip I

Finance Assistant 12 $0.00 $0.00 01-Aug-06 31-Jul-07

17 $0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 08-Oct-08 07-Oct-09

5 months

& 22 days

$0.00 $0.00 08-Oct-09 31-Mar-10

12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11 shifted from equip I

12 $0.00 $0.00 01-Aug-06 30-Jun-07Mohammad

Naeem

12 $0.00 $0.00 01-Apr-07 31-Mar-08

9 $0.00 $0.00 01-Apr-08 31-Dec-08

7 Months

& 8 Days

$0.00 $0.00 24-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$9,600.00 $9,600.00

01-Apr-10 31-Mar-11 shifted from equip I

6.5 $0.00 $0.00 15-Dec-05 30-Jun-06

6 Months

& 23 Days

$0.00 $0.00 01-Jul-06 23-Jan-07

12 $0.00 $0.00 13-Nov-07 12-Nov-08

12 $0.00 $0.00 13-Nov-08 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11 shifted from equip I

10 Months

& 12 Days

$0.00 $0.00 17-Oct-06 29-Aug-07Tamim

Yousafzai

15 Months

& 7 Days

$0.00 $0.00 24-Sep-07 31-Dec-08Mohammad Younus Atah

9 Months

& 29 Days

$0.00 $0.00 02-Mar-08 31-Dec-08 Abass Rahimi

10 motnths& 23 days

$0.00 $0.00 16-Jun-09 21-Apr-10

N/AN

N/A

Maryam Abassi

Munir

N

Husnia Noorzai

N

IC N

Mohammad Afzal

N/A

Mohammad Naeem

Procurement Assistant S1.8

IT Officer

IC

IC

Social Mobilization Specialist

Finance Officer

IC

Social Mobilization Assistant

IC

Senior Program Officer

S1.5

S1.6

S1.4

N

S1.7

N/A

Najibullah Akbari

N/A

N/A

Ghulam Jailani

Mohammad Kabir

Zabiullah Hashemi

111

110

109

108

112

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

8Months &

Days$8,400.00 $8,400.00 22-Apr-10 31-Dec-10

Shifted from EQUIP 1

11 $0.00 $0.00 01-May-10 30-Apr-11 vacant

12 $0.00 $0.00 11-Sep-06 10-Sep-07

15 Months

& 20 Days

$0.00 $0.00 11-Sep-07 31-Dec-08

3 $0.00 $0.00 01-Jan-10 31-Mar-1-

12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jul-06 30-Jun-07 Ahmad Sameer

15 $0.00 $0.00 01-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$9,600.00 $9,600.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

Program Assistant 12 $0.00 $0.00 15-Jul-06 14-Jul-07

17 Months

& 17 Days

$0.00 $0.00 15-Jul-07 31-Dec-08

7 Months

& 21 Days

$0.00 $0.00 10-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

10 Months

& 15 Days

$0.00 $0.00 16-Feb-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 21-Dec-06 20-Dec-07Sayed

Mohammad Momand

10 Months

& 21 Days

$0.00 $0.00 07-Feb-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 Months

& 29 Days

$0.00 $0.00 21-Dec-06 20-Dec-07Abdullah Jan

AhmedzaiMonitoring Officer N

Data Officer

N/A

Najibullah

N

N

N/A

N

Obaidullah Hayran

N/A

N/AEdi Farhad

Masooda Safi

N/A

N

Javid Stanekzai

N/A

Abdul Rahim Wardak

N

IC

Logistic Assistant

S1.9 Social Mobilization Assistant

S1.10

S1.14

S1.13 Provincial Relation Officer

IC

Program Officer

IC

IC

IC

IC

S1.12

117

S1.11115

114

116

113

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant

4 Months

& 16 Days

$0.00 $0.00 15-Apr-07 31-Aug-07Abdullah Jan

Ahmedzai

12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant

8 Months

& 6 Days

$0.00 $0.00 26-Dec-06 31-Aug-07 Murad Shaheed

12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant

8 Months

& 13 Days

$0.00 $0.00 19-Dec-06 31-Aug-07 Abdul Rahim

12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant

8 Months

& 13 Days

$0.00 $0.00 19-Dec-06 31-Aug-07Sidiq ur Rahman

12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant

6 Months

& 26 Days

$0.00 $0.00 05-Jan-07 31-Jul-07Mohammad

Naeem

16 $0.00 $0.00 01-Sep-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $14,400.00

$14,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S1.20 Deputy Equip Coordinator

9 Months

& 21 Days

$0.00 $0.00 IC N 11-Dec-06 30-Sep-07 Nader Barak N/A

15 Months

&11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08Abdul Wakil

Hanifi

9 $0.00 $0.00 01-Apr-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$39,600.00 $39,600.00

01-Apr-10

31-Mar-11

Shifted from EQUIP 1

15 Months

$0.00 $0.00 1-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$39,600.00 $39,600.00

01-Apr-10

31-Mar-11

Shifted from EQUIP 1

15 Months

$0.00 $0.00 1-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$39,600.00 $39,600.00

01-Apr-10

31-Mar-11

Shifted from EQUIP 1

Monitoring Assistant

Monitoring Assistant

N/A

IC

N

NIC

Kabir Ahmad Zai

IC

IC

N/A

N Sayed Ali Sajad

N

N

N/A

Sayed Noorullah

N/A

N/A

N/A

N/A

Nader Barak

N

N

Abdul Rahim Wardak

NIC

N/A

ICRegional CoordinatorS1.23

Regional Coordinator

Monitoring Assistant

121

118

S1.21

S1.19

119

120

S1.16

S1.15

Monitoring Assistant

IC

Regional Coordinator

IC

Social Mobilization Junior Officer

S1.22

S1.17

S1.18

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

15 Months

& 11 Days

$0.00 $0.00

01-Sep-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$9,900.00 $9,900.00

01-Jan-10 31-Mar-10

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08 Qaheer Khan

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08 Haji Amanullah

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00$0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S1.28 Regional Social Mobilizer officer9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09 vacant

3 $0.00 $0.00 N 15-Mar-07 14-Jun-07

12 $0.00 $0.00 Y 28-Jun-07 27-Jun-08

5 $0.00 $0.00 7-May-07 6-Oct-07

7 $0.00 $0.00 10-Jan-08 9-Aug-08

5 $0.00 $0.00 1-May-07 30-Sep-07

7 $0.00 $0.00 1-Jan-08 30-Apr-08

11 $0.00 $0.00 IC N 1-Sep-08 31-Jul-09 N/A

12 $48,780.00 $48,780.00 1-Oct-09 31-Jul-10

Following H.E. Instruction, Designation has been changed from Procurement Director to National Procurement Advisor

127 S1.33 Procurement Assistant 11 $7,700.00 $7,700.00 IC N 10-Oct-08 9-Oct-10 Omar N/A

Shifted from EQUIP 1

11 $0.00 $7,700.00 15-Nov-08 14-Nov-09 N/A

12 $8,400.00 $8,400.00 15-Nov-09 14-Nov-10

Shifted from EQUIP 1

12 $0.00 $7,200.00 1-Oct-08 30-Sep-09

5 $0.00 $3,000.00 1-Nov-09 31-Mar-10

12 $9,600.00 $9,600.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09 vacant

Sr. Social Mobilization Advisor

Survey Coordinator-EMIS Project

Transport Assistant

IC

N/A

Regional Social Mobilizer officer

IC

N

N

Procurement Assistant

N/A

N/A

Samiullah Safi

N/A

N/A

Abdul Qayun Ghani

Mohammad Suliman Kakar

NSayed

Naqibullah

Dr. Roshan Rasikh

N

N

N/A

Ehssanullah noori

IC

N/A

126

S1.29

S1.31

S 1.36 Liaisons Officer

Natoinal Procurement Advisor

S1.35

S1.34

IC

NIC Hamid

N

124

S1.27

Jawid Stanekzai

Abdul Wakil Hanifi

Farhad SediqiFinance Officer-EMIS Project IC

S1.30

S1.32

Regional Social Mobilizer officer

IC

IC

IC

Regional Social Mobilizer officer

N

Regional CoordinatorS1.24122

S1.25123

S1.26

N/A129

130

128

125

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

11 $0.00 $0.00 01-May-10 31-Mar-11 Vacant

S1.37 Tracking Database Officer 9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09 vacant

8 Months

$0.00 $0.00 IC N 21-May-08 31-12-08

12 months

$0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $17,280.00 $17,280.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

$536,736.00 $454,756.00

7 $0.00 $0.00 IC Y 01-Jun-06 31-Dec-06 Jeaniene Spink N/A

11 $0.00 $0.00 03-May-09 02-Apr-10

12 $60,000.00 $60,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 4-Jul-06 03-Jul-07

17 Months

& 28 Days

$0.00 $0.00 4-Jul-07 31-Dec-08

12 $0.00 $0.00 Y 11-Jun-06 10-Jun-07

20 Days

$0.00 $0.00 N 11-Jun-07 30-Jun-07

18 $0.00 $0.00 1-Jul-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

12 $0.00 $0.00 16-Jun-09 15-Jun-10

12 $42,000.00 $42,000.00 01-Apr-10 31-Mar-11

already existing in equip II

4.5 $0.00 $0.00 N 15-Jun-06 31-Oct-06

7.5 $0.00 $0.00 1-Nov-06 15-Jun-07

18.5 $0.00 $0.00 16-Jun-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

12 $0.00 $0.00 15-Aug-09 14-Aug-10

12 $54,000.00 $54,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 Y 1-Jun-06 31-May-07

1 $0.00 $0.00 N 1-Jun-07 30-Jun-07

18 $0.00 $0.00 Y 1-Jul-07 31-Dec-08

Finance Officer 7.5 $0.00 $0.00 15-May-06 31-Dec-06

4.5 $0.00 $0.00 1-Jan-07 14-May-07

19 Months

& 17 Days

$0.00 $0.00 15-May-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

3 Months

$0.00$0.00 1-Jan-10 31-Mar-10

12

$39,600.00 $39,600.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 15-May-06 14-May-07

19 Months

& 17 Days

$0.00 $0.00 15-May-07 31-Dec-08

15 $0.00 $0.00 1-Oct-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 12-Sep-09

10 $0.00 $0.00 1-Jun-10 31-Mar-11 vacant

Logistics & Admin Assistant7 $0.00 $0.00 1-Jun-06 31-Dec-07

Snr. Admin and Finance Advisor IC

IC

IC

IC

Y

N

N

N/A

Gulali Monmand

Eng. Yonus

N/AMiajan Mia

Matin Rasuly

N/A

Masooda Safi

N/A

Nargis Nehan N/A

Qudratullah Andar

Snr. Technical Advisor

136

135

Engineering Advisor

Finance & Admin OfficerS.2.7

134

Finance Manager - Payroll

Social Mobilisation Officer

Snr. Policy Advisor

S 1.36 Liaisons Officer

S2.6

Attaullah Wahidyar

Masooda Safi

S2.1

S 1.38

MOE POLICY DEVELOPMENT & CAPACITY BUILDING TEAM

IC N

132

zia Radyar

S2.5

S2.4

S2.3

Human Resource Management Advisor

RIMU Coordinator

YIC

Y

N/A

N/AYDr. Sedeq

Weera

133

130

S2.2

131

Subtotal:

IC

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

5 $0.00 $0.00 1-Jan-07 31-May-07

19 $0.00 $0.00 1-Jun-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

3 Months

$0.00$0.00 1-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 13-May-06 12-May-07

1 Month & 19 Days

$0.00 $0.00 13-May-07 30-Jun-07

18 $0.00 $0.00 1-Jul-07 31-Dec-08

S2.10 IT Manager 12 $0.00 $0.00 IC N 4-Jul-06 03-Jul-07 Salim Hayran N/A

12 $0.00 $0.00 N 1-Jul-06 30-Jun-07

18 $0.00 $0.00 Y 1-Jul-07 31-Dec-08

12 $0.00 $0.00 06-Mar-09 05-Mar-10

12 $35,292.00 $35,292.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Jul-06 30-Jun-07

18 $0.00 $0.00 1-Jul-07 31-Dec-08

5.5 $0.00 $0.00 19-Jul-06 31-Dec-06

5 Months

& 16 Days

$0.00 $0.00 1-Jan-07 16-Jun-07

Finance Manager - Budget & Accounting (Replacement)

16 Months

& 27 Days

$0.00 $0.00 5-Aug-07 31-Dec-08 Zaher Nazari

12 Months

$0.00 $0.00 IC N 5-Jun-09 4-Jun-10

12 $24,000.00 $24,000.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 29-Jul-06 28-Jul-07

17 Months

& 3 Days

$0.00 $0.00 29-Jul-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

12 $20,160.00 $20,160.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10Mohammad

Bilal

5.5 $0.00 $0.00 19-Jul-06 31-Dec-06

6.5 $0.00 $0.00 1-Jan-07 18-Jul-07

1 Month & 13 Days

$0.00 $0.00 19-Jul-07 31-Aug-07

12 $0.00 $0.00 7-Nov-07 08-Nov-08

13 momths

& 23 days

$0.00 $0.00 7-Nov-08 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-11

12 $17,280.00 $17,280.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 7-Nov-08 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

N

IC

IC

NIC

Abdul Wali

N/A

N/A

Wadid ur Rahman

Rahimullah

Haleem Shah

N/A

Jamaluddin Hamid

N

N/A

N/A

N/A

Samima Durrani

Habib Ur Rahman Wayand

Fridoon Satary

Shafi Haqmal

IC

Mohammad Bilal

IC

IC

N

N

Y

Logistics Assistant

Finance Manager - Budget & Accounting

IT Officer/ Database Administrator

IT Officer/ LAN Administrator

IC

Finance Manager - Budget & Accounting

S2.12

S2.15141

S2.14

139

140

Executive Assistant & Advisor to Minister

S2.8137Logistics & Admin Officer

Admin AdvisorS2.9

S2.11138

S2.13

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

6 Months

& 21 Days

$0.00 $0.00 1-Jan-07 21-Jul-07

11 Months

& 30 Days

$0.00 $0.00 2-Jan-08 31-Dec-08 Ziaullah Hashmi

12 $0.00 $0.00 5-Aug-06 04-Aug-07 Zaher Nazari

12 Months

& 22 Days

$0.00 $0.00 10-Dec-07 31-Dec-08 Arian Rahimi

7 $0.00 $0.00 1-Jun-08 31-Dec-08Engr. Abdul

Zohour

3 Months

$0.00 $0.00 1-Jan-10 31-Mar-10

12 Months

$23,520.00 $23,520.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Mar-06 28-Feb-07Mohammad Amin Saraj

10 $0.00 $0.00 1-Mar-08 31-Dec-08 Vacant

8 Months

& 10 Days

$0.00 $0.00 22-Oct-05 30-Jun-06

4 $0.00 $0.00 1-Jul-06 31-Oct-06

12 $0.00 $0.00 1-Nov-06 31-Oct-07

14 $0.00 $0.00 1-Nov-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$16,200.00 $16,200.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S2.20 Donor Coordination Manager12 $0.00 $0.00 IC N 20-Sep-06 19-Sep-07Abdul Wakil

HanifiN/A

12 $0.00 $0.00 28-Oct-06 27-Oct-07 Shazia Saba

10 Months

& 8 Days

$0.00 $0.00 21-Feb-08 31-Dec-08 Sameer Haidari

12 $0.00 $0.00 1-Oct-06 30-Sep-07

15 $0.00 $0.00 1-Oct-07 31-Dec-08

12 $0.00 $0.00 1-Dec-06 30-Nov-07

13 $0.00 $0.00 1-Dec-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 14-Apr-09

11 $0.00 $0.00 IC N 15-Apr-09 14-Mar-10

in lieu of S2.23.Selection will be done after approval of Plan

The designation has been changed from Finance Director to Finance Adviser based on H.E. instructions, but the TOR remains the same.

N

N N/A

N/A

Noorulhaq Farid

N/A

N/A

N/AZiaulhaq Safi

Zia ul Haq Safi

Arian Rahimi

Zaher Nazari

N/A

Ab. Mobeen Quraishee

N/A

N

IC

IC N

IC N

N

S2.19

Finance Adviser

S2.23 IC

ICAdmin Manager

S2.23

S2.22

S2.21 IC

IC

EMIS Specialist

Senior Procurement Officer

Senior. Procurement Officer

144

143

Finance Manager Budget

Executive Assistant to Deputy Minister

Donor Coordination Officer

S2.17142

S2.16

S2.18

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 months

& 15 Days

$48,780.00 $48,780.00 15-Mar-10 31-Mar-11Shifted from EQUIP 1

S2.24 International Procurement Advisor12 $0.00 $0.00 18-Nov-07 17-Nov-08Greesh Kumar

SharmaN/A

S2.25 International Implementation Advisor15 $0.00 $0.00 1-Oct-07 31-Dec-08 Vacant N/A

S2.26 National Procurement Consultant43

Days$0.00 $0.00 IC N 3-Aug-06 21-Sep-06 Najeeb Azizi N/A

12 $0.00 $0.00 11-Jan-07 10-Jan-08

11 Months

& 21 Days

$0.00 $0.00 11-Jan-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 Months

$9,600.00 $9,600.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Mar-07 28-Feb-08

10 $0.00 $0.00 1-Mar-08 31-Dec-08

12 $0.00 $0.00 21-Feb-07 20-Feb-08 Abdul Baseer

10 Months

& 8 Days

$0.00 $0.00 21-Feb-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $40,800.00 $40,800.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S2.30 Monitoring & Evaluations (Schools Survey)15 $0.00 $0.00 IC Y 1-Oct-07 31-Dec-08 Vacant N/A

12 $0.00 $0.00 IC Y 3-Feb-08 2-Feb-09 N/A

$0.00 $0.00 3-Feb-09 2-Feb-10

S2.32 International Database Developer 15 $0.00 $0.00 IC Y 1-Oct-07 31-Dec-08 Vacant N/A

S2.33 National Database Developer 15 $0.00 $0.00 IC N 1-Oct-07 31-Dec-08Mohammad Shafi Afzali

N/A

12 $0.00 $0.00 1-Jun-07 31-May-08

12 $0.00 $0.00 1-Jun-08 31-May-09

S2.35 Procurement Manager

18 Months

10 Days

$0.00 $0.00 IC Y 21-Jun-07 30-Jun-08 Edrees Omarzad N/A

12 $0.00 $0.00 04-Jun-07 03-Jun-08

6 Months

& 27 Days

$0.00 $0.00 04-Jun-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$50,400.00 $50,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 17-Apr-07 16-Oct-07

6 $0.00 $0.00 17-Oct-07 16-Apr-08

8 Months

& 14 Days

$0.00 $0.00 17-Apr-08 31-Dec-08

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

Salim Hayran

N/A

ICSnr. Financial Management Advisor Assad Zamir

N/A

G.V. Narayana Murthy

N/A

Lutfullah Safi

Khwaja Omary N/A

FaizullahS2.27

S2.34

S2.37

S2.31

Team Leader

S2.28

S2.29

International Procurement Advisor

S2.36 Project Manager (Empolyee Registeration & ID Card IssuaICe Project

IC

ICSenior AdvisorVocational & Technical Education

GMU Assistant

Planning, Monioring & Reporting Advisor

Wazir Razi N/A

Ahmad Rateb

N/A

N

Y

N

N

IC

IC

IC N

147

148

146

145

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S2.38

S2.39

Team Leader

Team Leader

N/A

Abdul Ghafar

Akhtar Mohammad

Ahmad Rateb

Mohammad Ameen

N/A

N/A

Zia Ahmad Khwaja N/A

N/AAhmad Bashir

IC

N

IC

IC

N

N

N

N

IC

Team Leader

IC

S2.41

Team Leader

Team Leader151

153

150

S2.40

S2.42

152

149

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

S2.47

N

N

IC

IC

IC

IC

Team Leader

Team Leader

156

158

155

154

S2.46157

S2.44

S2.43

N/A

N/A

Team Leader

Team Leader

Team Leader

Ebad ur Rahman

Mohammad Haroon

Tamim Satari

N/A

S2.45

N

Mohammad Mustafa

N/A

IC

N

Abdul Sami

N

Abdul Khabir MasoudN/A

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$20,120.00 $20,120.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

$0.00 $0.00

Team Leader

N

N

S2.51 Team Leader

163 S2.52

Team Leader

Team Leader

Team Leader

S2.49

S2.50

160

162

S2.48159

161

Noor Agha Ahadyar N/A

IC

N/A

Hamed Hamdard

Abdul Rahman

Zabiullah Noori

N/A

N/A

N

IC

N/A

N

IC N

Haji Yousuf

IC

Ahmad Shaker

IC

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10Ajmal

12

$8,400.00 $8,400.00

01-Jun-10 31-Mar-11

vacant

Shifted from EQUIP 1

6 $0.00 $0.00 01-May-07 31-Oct-07

6 $0.00 $0.00 01-Nov-07 30-Apr-08

8 $0.00 $0.00 01-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07Mohammad Akbar Lagzay

6 $0.00 $0.00 15-Oct-07 14-Apr-08 Vacant

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09 Mohd Rateb

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10Team Leade

r

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09 Ahmad Shaker

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

IC

IC

S2.58 Team Leader

IC

IC

Team Leader

Ahmad Tawab

Hazrat Shah

Team Leader

IC

Team Leader

Team Leader

S2.59

S2.56 Team Leader

Team LeaderS2.57

S2.54

S2.55

170

S2.53

167

165

169

164

168

166

N/A

N/A

IC N

IC

N

Abdul Sami

N/A

N

N

N

Qazi Mohammad Amin

N/A

Nematullah

Ahmad zai

N/A

N/A

Baktash

Hamidullah TokhiN/A

Mehdi

N

Abdul Kabir MoqeemIC

N

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

N N/A

Zabihullah Atal

N

N Sayd Zaher N/A

Frogh Big

Jawedurahman

Team Leader

Team Leader

Team Leader

IC

S2.61

S2.62

S2.64 Team Leader

S2.60

IC

NIC Din Mohammad

IC

IC

S2.63

172

Team Leader

174

173

175

171

N/A

N

Waheedullah

N/A

Farooq Faqor

N/A

Abdul Basir

Ahmad Khalid Nabi

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$8,400.00 $8,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 01-May-07 31-Oct-07

6 $0.00 $0.00 01-Nov-07 30-Apr-08

8 $0.00 $0.00 01-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 17-Apr-07 16-Oct-07 Nesar Ahmad

6 $0.00 $0.00 17-Oct-07 16-Apr-08 Vacant

12 $0.00 $0.00 01-Jan-09 31-Dec-09 Ajmal

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 15-Apr-07 14-Oct-07

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

N/A

Team Leader

IC

N/A

N/A

Haji Habibullah

N/A

N/A

Khyber

IC

N

N

N

N

Amir Mohammad Ulfat

IC

IC

Team Leader

IC

IC

S2.67

S2.66 Team Leader

Team Leader

Team Leader

177

S2.69

180

176

S2.68

S2.65

182

181

Danish

N

N/A

Mohammad Sarwar

Ahmad zamer Rasheedi

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 15-Aug-09 Shah Wali N/A

7.5 $0.00 $0.00 13-Sep-09 31-Mar-10

12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11 from 10 $0.00 $0.00 1-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 3-Jan-09

12 $0.00 $0.00 4-Jan-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $19,200.00 $19,200.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S2.73Admin Assistant

12 $0.00 $0.00 IC N 14-Dec-07 13-Dec-08Ahmad Shekib

FeraziN/A

12 $0.00 $0.00 15-Dec-07 14-Dec-08 Yalda Hashemi

8 Months

& 19 Days

$0.00 $0.00 12-Mar-08 13-Dec-08

12 $0.00 $0.00 14-Dec-08 13-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$10,740.00 $10,740.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S2.75 Provincial Financial Coordinator

14 Months

& 17 Days

$0.00 $0.00 IC N 15-Oct-07 31-Dec-08 Vacant N/A

S2.76 Logistic Assistant

14 Months

& 17 Days

$0.00 $0.00 IC N 15-Oct-07 31-Dec-08 Vacant N/A

S2.77 Deputy Head of GMU

14 Months

& 17 Days

$0.00 $0.00 IC N 15-Oct-07 31-Dec-08 Vacant N/A

6 $0.00 $0.00 15-Oct-07 14-Apr-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

189 S2.79 Finance Assistant 9 $8,100.00 $0.00 01-Jul-10 31-Mar-11

Newly Proposed

Newly proposed and approved by

WB

$859,952.00 $851,852.00

12 $0.00 $0.00 01-Jun-06 31-May-07

1 $0.00 $0.00 01-Jun-07 30-Jun-07

18 $0.00 $0.00 01-Jul-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

S2.70

Rahimullah

IC N

Abdul aziz

EQUIP ENGINEERING TEAM

IC

N

N

Procurement Officer

N/A

N

Subtotal:

S2.71

Team Leader

IC

IC

S2.78

S2.74

IC

S2.72

Finance Assistant

Provincial Financial Officer

184

183

187

186

185

N/A

N/A

Jamshid Sediqi

Masooda Samadi

N/AHamidullah

Rahil

NHashmatullah

Momand

Team Leader

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jun-06 31-May-07

1 $0.00 $0.00 01-Jun-07 30-Jun-07

18 $0.00 $0.00 01-Jul-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 14-Apr-07 13-Apr-08

8 Months

& 17 Days

$0.00 $0.00 14-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 14-Oct-06 13-Oct-07

14 Months

& 18 Days

$0.00 $0.00 14-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09Miss Huma

Sadat

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$21,600.00 $21,600.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 08-Oct-06 07-Oct-07

14 Months

& 24 Days

$0.00 $0.00 08-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad

Mustafa

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10 Mansoor Mansori

10 Months and 15 days

$13,986.00 $13,986.00

16-May-10 31-Mar-11Mohammad Rahim

Shifted from EQUIP 1

12 $0.00 $0.00 08-Oct-06 07-Oct-07

14 Months

& 24 Days

$0.00 $0.00 08-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad

Shah

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S3.6

S3.2

Mohammad Zarif

N/A

IC

IC

N/A

Fatema

IC

N

IC

IC

Architect

Civil/Design Engineer

S3.1

S3.4

S3.5

190

Civil/Design Engineer

Civil/Design Engineer

Architect

Architect

191

193

S3.3192

194

195

N

N

Miss Nakila Afzali

Daud

Mohammad Zarif

N

Ziaurahman

Khalilullah

N

N/A

N/A

N/A

Mir Mohammad Tamim

Haroon

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 01-Jun-06 31-May-07

1 $0.00 $0.00 01-Jun-07 30-Jun-07

18 $0.00 $0.00 01-Jul-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$15,984.00 $15,984.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 14-Apr-07 13-Apr-08

8 Months

& 17 Days

$0.00 $0.00 14-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09Miss Nakil

Afzali

3 months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$15,984.00 $15,984.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 14-Apr-07 13-Apr-08Nooria

Haqnegar

12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad

Shah

3 months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$9,000.00 $9,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 6-Jun-07 5-Jun-08 Noor Agha

12 $0.00 $0.00 01-Jan-09 31-Dec-09Mansoor Mansoori

11 $14,652.00 $0.00 01-Jun-10 30-Apr-11 Vacant

12 $0.00 $0.00 15-May-07 14-May-08

7 Months

& 17 Days

$0.00 $0.00 15-May-08 31-Dec-08

3 months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

IC N 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

201 S3.12 Monitoring engineers 9 $9,000.00 $0.00 IC N 01-Jul-10 31-Mar-11 Newly Proposed

202 S3.13 Monitoring engineers 9 $9,000.00 $0.00 IC N 01-Jul-10 31-Mar-11 Newly Proposed

203 S3.14 Monitoring engineers 9 $9,000.00 $0.00 IC N 01-Jul-10 31-Mar-11 Newly Proposed

$182,274.00 $140,622.00

12 $0.00 $0.00 01-Aug-06 31-Jul-07

12 $0.00 $0.00 01-Aug-07 31-Dec-08

11 $0.00 $0.00 01-Feb-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 06-Nov-06 05-Nov-07Eng. Khalilah

Nasih

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

IC

NIC

198

S3.10

200

199

205 S4.2

204

PROVIICIAL EQUIP TEAMS/ Kabul Province

W/S Engineer

S3.11

EQUIP Officer

Abdul Zahour

Mohammad Mustafa

S4.1

IC

IC N

IC

IC

Estimator

IC

Civil/Design Engineer

Surveyor

S3.7

197

S3.9

S3.8

196

IT Officer/ Admin

Kabul Civil Engineer

N

N

Mohammad Shah

N Tamim

N/A

N/A

N/A

Miss Huma Sadat

N/A

N/A

Sayed Jamil Mir

Mir Abdul Qayum

N/AAhmad Seayer

Mohammad

N/A

Maiwand

N

N

Subtotal:

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S4.3 Kabul Civil Engineer 12 $0.00 $0.00 IC N 06-Nov-06 05-Nov-07Eng. Rashid

SharifN/A

12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$10,740.00 $10,740.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 5-Jun-07 4-Jun-08Sayed

Habibullah Pacha

12 $0.00 $0.00 4-Aug-07 3-Aug-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 5-Jun-07 4-Jun-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$67,572.00 $67,572.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,960.00 $12,960.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 Vacant N/A

3 Months

$0.00 $0.00 01-Jan-09 31-Dec-09

12 $0.00 $0.00 IC N 01-Jan-10 31-Mar-10 N/A as assistant

12 $9,600.00 $9,600.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

S4.8 Social Mobilizer

N/A

IC

IC

Kabul City

S4.5

S5.2

S4.7

S5.3

S4.4

IC

S5.1

IC

Social Mobilizer

EQUIP Officer

206

210

209

208

207

Engineer, Kabul City

Finance Officer

N

Engineer

N

IC

211

Finance Officer

Subtotal:

Jawed joya

Mohammad Sediq

Rahimullah Keshaf

N/A

Moh. Ishaq N/A

Masooma

Mohammad Nabi

Hezbullah Zahid

N

N

N

N/A

Sayed Mujtaba

N/A

N/A

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

S5.15

Engineer, Kabul City

Engineer, Kabul City

Ahmad Masoud Khaliq

IC

IC

IC

N

N

NIC

N/A

Sayed Abdul Saboor

S5.5

S5.12

S5.13

IC

IC

N Mohammad Ajmal

N/AAjmal Farid

S5.16

S5.7

S5.14

S5.9

S5.4

S5.8

S5.6

IC

ICEngineer, Kabul City

Engineer, Kabul City

IC

IC

IC

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

IC

Engineer, Kabul City N/A

Mohammad HaroonN/A

N/A

N

N Gulam Nabi

Hamidullah-1 N/A

Gul Ahmad N/A

N

N

Mohammad Bashir

N/A

N/A

S5.10

Engineer, Kabul City

Engineer, Kabul City

N

N

N

N

Engineer, Kabul City

Engineer, Kabul City

S5.11

N/A

N/A

N Mohammad Naeem

Shams ur RahmanN/A

N/A

Abdul Hasib/ Shah Maqsood

IC

Ghulam Rabani

N

Mohammad MasoomS5.17

N/A

Engineer, Kabul City IC

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

6 $0.00 $0.00 10-May-07 9-Nov-07

1 Month & 21 Days

$0.00 $0.00 10-Nov-07 31-Dec-07

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 1-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 1-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 1-Jan-10 31-Mar-10

S5.27

IC

S5.19

S5.21

S5.23

S5.18

S5.25

S5.24

212

S5.29

Fazel Rahim

S5.20

N

NEngineer, Kabul City Mohammad Fahim

Engineer, Kabul City IC

IC

Engineer, Kabul City IC

N/A

Alah Nazar NaqibiS5.22

N/A

Hamidullah-2 N/AN

N

N/A

Engineer, Kabul City IC N

Alah NawazEngineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City IC

IC

Engineer, Kabul City N

N/A

N

N

Mohammad Aslam

N/AGhulam Mohayodin

IC

Ms. Nasima

N/A

N/A

N/A

N/A

N/A

Mansoor

Noor Ahmad

Sayed Akbar

Mohammad Kabir

213

N

N

N

Engineer

Engineer, Kabul City N

Engineer, Kabul City

S5.28 Engineer

IC

N/AICS5.26

IC

IC

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$11,208.00 $11,208.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 5-Jun-07 4-Jun-08Mir Abdul Qayum

12 $0.00 $0.00 1-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 1-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 5-Jun-07 4-Jun-08Sayed

Noorullah

12 $0.00 $0.00 1-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 1-Jan-10 31-Mar-10

12

$9,600.00 $9,600.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

$65,784.00 $65,784.00

12 $0.00 $0.00 01-Jun-06 31-May-07 Sayed Baqir

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jul-06 30-Jun-07 Eng. Besmullah

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

11 $0.00 $0.00 01-May-10 30-Apr-11 Vacant

Shifted from EQUIP 1

12 $0.00 $0.00 01-Nov-06 31-Oct-07

14 $0.00 $0.00 01-Nov-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

11 $0.00 $0.00 01-May-10 30-Apr-11 Vacant

Shifted from EQUIP 1

12 $0.00 $0.00 01-Aug-06 31-Jul-07

1 $0.00 $0.00 01-Aug-07 31-Aug-07

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

Social Mobilizer

Engineer

S6.2

IC

Aseel Khan Ahmadzai

Mohammad Zafar

S5.30

N/A

Engineer

N

IC

N

IC

IC N

N

Eng. Mehrab

219

N/A

Social Mobilizer

S6.3

S6.5220

218

217

215

216

214

NIC

Badakhshan Province

EQUIP Officer

N

Amina Naeemi

Hasan Noorzai

N/A

S5.31

ICN/A

Mohammad Asif

N/AEzatullah

N/A

N

N/A

S6.1

S6.4 Finance Officer

IC

Social Mobilizer

Subtotal:

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$50,400.00 $50,400.00

12 $0.00 $0.00 01-Aug-06 31-Jul-07 Haji Amanullah

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 11-Nov-06 10-Nov-07

13 Months

& 20 Days

$0.00 $0.00 11-Nov-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 16-Apr-07 15-Apr-08

8 Months

& 15 Days

$0.00 $0.00 16-Apr-08 31-Dec-08

9 $0.00 $0.00 01-Apr-09 31-Dec-09 Hidaytullah

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 10-Oct-06 09-Oct-07

14 Months

& 22 Days

$0.00 $0.00 10-Oct-07 31-Dec-08

8 Months

& 9 Days

$0.00 $0.00 22-Apr-08 31-Dec-08 Abdul Salim

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

N

Hussian Shah

N/A

N

221

224

N/A

S7.4

N

Finance Officer

Subtotal:

S7.1

S7.3

EQUIP Officer

S6.6

S7.5225

222

226

223

N/A

Sangin Khan

Eng. Bad shah Gul

Mohammad Wazir

S7.2 Engineer

Khost Province

N

Social Mobilizer

IC

IC

N/A

IC

Qaribullah N/A

Eng. Ahsanullah

N/A

Eng. Mojeebul Rahman

Social Mobilizer

Engineer

IC

N

IC N

IC

Abdullah Stanikzia

S7.6 Social Mobilizer

IC N

N/A

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$44,000.00 $44,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$94,400.00 $94,400.00

Paktika Province

12 $0.00 $0.00 01-Aug-06 31-Jul-07 Azizullah

12 $0.00 $0.00 20-May-07 19-May-08 Moh. Shafiq

12 $0.00 $0.00 25-Jun-07 24-Jun-08

12 $0.00 $0.00 25-Jun-08 31-ma

12

$14,400.00 $14,400.00

01-May-10 30-Apr-11 Vacant

Shifted from EQUIP 1

12 $0.00 $0.00 18-Nov-06 17-Nov-07 Kabulai

12 $0.00 $0.00 1-May-07 30-Apr-08

8 $0.00 $0.00 01-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 07-Jan-07 06-Jan-08 Moh. Shafiq

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Nov-06 31-Oct-07 Sayed Abdullah

12 $0.00 $0.00 25-Jun-07 24-Jun-08

12 $0.00 $0.00 25-Jun-08 24-Jun-09

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,520.00 $11,520.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$73,440.00 $73,440.00

12 $0.00 $0.00 01-Aug-06 31-Jul-07 Abdul Rauf

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

EQUIP OfficerS8.1

NIC

Subtotal:

Social Mobilizer

S8.6

N

IC

232

Subtotal:

229

228

227

230

231

S8.2 N/A

Finance Officer

IC

Engineer S8.3

Eng. AzimEngineer

IC

N

IC N/A

Sayed Ahmad

N

S8.4

S8.5

Social Mobilizer

IC

N

N/A

Mohammad Jawid Noori

Mohd. Shoib N/A

N/A

Baryalai

IC

Abdul Rahman N/A

Kandahar Province

N

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 22-Nov-06 21-Nov-07

13 Months

& 9 Days

$0.00 $0.00 22-Nov-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 28-Nov-06 27-Nov-07

13 Months

& 3 Days

$0.00 $0.00 28-Nov-07 31-Dec-08

9 $0.00 $0.00 01-Apr-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Mar-07 28-Feb-08

10 $0.00 $0.00 01-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$73,440.00 $73,440.00

12 $0.00 $0.00 08-Nov-06 07-Nov-07 Ab. Qahir Qahir

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 03-Dec-06 02-Dec-07

S9.4

S9.5

Engineer

Social Mobilizer

235

Subtotal:

S9.3

Finance Officer

EQUIP Officer

IC

N

IC

IC

N

IC

Social Mobilizer238 S9.6

234

233

239

236

237

IC

S9.2 EngineerSayed

Mohammad Dost

N/A

ICAbdul Bari N/A

N

S9.1 N/ANoor Mohammad

N

Toor Gul

Najeebullah

N

Khalid Zaher

N

N/A

Helmand Province

S10.1 EQUIP OfficerZai-e- Haq

N/A

Masood N/A

N/A

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 Months

& 29 Days

$0.00 $0.00 03-Dec-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 03-Dec-06 02-Dec-07

12 Months

& 29 Days

$0.00 $0.00 03-Dec-07 31-Dec-08

9 $0.00 $0.00 01-Apr-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10 Sheikh Ahmad

11 $0.00 $0.00 01-May-10 30-Apr-11 vacant

12 $0.00 $0.00 01-Mar-07 28-Feb-08

10 $0.00 $0.00 01-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 04-Aug-07 03-Aug-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 04-Aug-07 03-Aug-08 Abdul Wakil

14 Months

& 12 Days

$0.00 $0.00 20-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$62,400.00 $62,400.00

12 $0.00 $0.00 01-Feb-07 31-Jan-08Ghulam

Mohammad

10 $0.00 $0.00 01-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 02-Jan-09 01-Jan-10

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

IC

Architect

Ezatullah Noorulhaq

Abdul Hadi

S10.2

N

Social Mobilizer

IC

N

Engineer N/A

IC

S10.3

Snr. Civil Engineer

245

246

241

242

240

243

244 S10.6

Asadullah

Sayed Akbar N/A

N/A

HamidullahN/A

Nematullah N/A

N/A

N

S10.4 Finance Officer

IC N

IC

UlfatN/A

S10.5

N

Social Mobilizer

IC N

Subtotal:

S11.1

Zabul Province

EQUIP Officer

IC

S11.2

N

Mohammad Nasim

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 IC N 03-Jan-09 02-Jan-10 N/A

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Mar-07 28-Feb-08

10 $0.00 $0.00 01-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,400.00 $11,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 26-May-07 25-May-08

7 Months

& 6 Days

$0.00 $0.00 26-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$71,400.00 $71,400.00

12 $0.00 $0.00 24-Apr-07 23-Apr-08 Roshan Rasikh

12 $0.00 $0.00 23-May-09 22-May-10

10 Months

&7 days $14,400.00 $14,400.00

23-May-10 31-Mar-11Shifted from EQUIP 1

12 $0.00 $0.00 1-May-07 30-Apr-08

8 $0.00 $0.00 01-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 14-Apr-07 13-Apr-08

8 Months

& 17 Days

$0.00 $0.00 14-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months $0.00 $0.00 01-Jan-10 31-Mar-10

Subtotal:

N/A

IC

N

N/A

Jamaludin

S12.1

Social Mobilizer

S12.4

N/A

Finance Officer

S12.3 N/A

N

252

253

254

S12.2

251 EQUIP Officer

S11.3

S11.4 Finance Officer

Social Mobilizer

S11.5

247

248

249

250

IC

IC

Nooristan Province

Moh. Hamayoon

S11.6

Engineer Zabihullah

Ahmad Farid

Ahmad Farhad

Ataullah

Abdul Wahid

Mohammad Muslim Khan

Ibrahimi

Abdul Rahman

Engineer

IC

N/AN

N/AN

Engineer

N/A

N

IC

IC N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$12,000.00 $12,000.00

01-Apr-10 31-Mat-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09 N/A

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1_Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08 vacant

12 $0.00 $0.00 23-May-09 22-May-10

12 $12,000.00 $12,000.00 23-May-10 22-May-11

Shifted from EQUIP 1

$74,400.00 $74,400.00

12 $0.00 $0.00 1-May-07 30-Apr-08

8 $0.00 $0.00 01-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$15,984.00 $15,984.00

1_Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Jun-07 31-May-08

7 $0.00 $0.00 01-Jun-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$17,280.00 $17,280.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-May-07 30-Apr-08

8 $0.00 $0.00 01-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,612.00 $12,612.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Jul-07 30-Jun-08

12 $0.00 $0.00 1-Jul-08 30-Jun-09

12 $0.00 $0.00 7-Jan_09 6-Jan-10

12 $12,612.00 $12,612.00 7-Jan-10 6-Jan-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Jul-07 30-Jun-08

12 $0.00 $0.00 1-Jul-08 30-Jun-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $12,612.00 $12,612.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

262 S13.6 Engineer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

12 $0.00 $0.00 23-Apr-07 22-Apr-08

8 Months

& 8 Days

$0.00 $0.00 23-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

S13.3

Shafiullah

Social Mobilizer

Urzgan Province

S13.2

M. Haroon Durani

N/A

IC

Social Mobilizer

N

S12.5

S13.4

263

260

261

258

257

259

256

255

NIC

S12.6

N/A

Mohammad Akbar

Amanullah N/A

N

S13.1 EQUIP Officer/ProviICial Education Advisor

IC

Subtotal:

Finance Officer

IC

Social Mobilizer

IC

N/AAhmad Jan

N

Ahmed farid

N

N/AEngr. AmdullahEngineer

N

N/ASocial Mobilizer

IC

Karimullah

IC

N

Engineer

N

N/AEng. Naseer

IC

S13.7

S13.5

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,612.00 $12,612.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$83,712.00 $83,712.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

265 S14.2 Finance Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08 vacant

9 $0.00 $0.00 01-Apr-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

6 $0.00 $0.00 12-May-07 11-Nov-07

7 Months

& 20 Days

$0.00 $0.00 12-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 12-May-07 11-May-08Khalilullah

Nasih

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08 Rafiullah

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

269 S14.6

267

264

268

S14.3266

S14.4

S14.5

S14.1

263

N

Mohd. Mohsen

N

N/A

Sediqullah Safi

Ajmal

N/A

Abdul Khalil Mansoori

N/A

N

Engineer

Akbar Hussain

Engineer

N

Daikundi Province

N/A

N/A

Eng. Naseer

IC

IC

EQUIP Officer

IC

S13.7

Social Mobilizer

Subtotal:

Social Mobilizer

Abdul Baseer

IC

Engineer

N

N/A

IC

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

$72,972.00 $72,972.00

12 $0.00 $0.00 20-May-07 19-May-08 Azizullah

7 $0.00 $0.00 1-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$13,380.00 $13,380.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 20-May-07 19-May-08

7 Months

& 12 Days

$0.00 $0.00 20-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 20-May-07 19-May-08

7 Months

& 12 Days

$0.00 $0.00 20-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 21-May-07 20-May-08

7 Months

& 11 Days

$0.00 $0.00 21-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 21-May-07 20-May-08

7 Months

& 11 Days

$0.00 $0.00 21-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

IC

271

Subtotal:

S15.6

S15.2

374

IC N

273

Finance Officer

S15.3 Social Mobilizer

Engineer275

S15.5 Engineer

272

EQUIP Officer270

S15.4

N

Social Mobilizer

Sayed Abdullah

N

masoodN/A

Mohammad Hussain

IC

N/A

N/A

S15.1

Baghlan Province

N

N

N/A

Abudl Rauf

N/A

Mohammad Afzal

IC

IC

IC

Ennayatullah

N

N/A

Rashid Sharif

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 21-May-07 20-May-08

7 Months

& 11 Days

$0.00 $0.00 21-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$81,420.00 $81,420.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$13,380.00 $13,380.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$10,260.00 $10,260.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08 Khalilullah

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

IC

IC

IC

IC

Obaidullah

Ehsanullah

Subtotal:

282

277

S15.7276

EQUIP Officer

Social Mobilizer

N/A

Mohammad Haroon

IC

N/A

S16.1

Herat Province

Engineer

Mohammad Aref

N/A

N

N

N/A

N

S16.5281

Finance Officer

S16.4 Social Mobilizer280

S16.2

279

278

Engineer

S16.6 Engineer

N

Muhammad Ehsan

Abdul Jabar

N

Abdullah

Abdul Qadeer

IC

S16.3

N/A

N/A

N/A

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$68,472.00 $68,472.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$15,984.00 $15,984.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09 N/A

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08 Zabiullah Saidy

12 $0.00 $0.00 01-Jan-09 31-Dec-09Sayed

Mohammad Taqi

IC N

Sardar Mohammad

IC

Mohd. Barat

IC

IC

Ehsanullah

NIC

Ahmad Khalid

N/A

N/A

Mohammad Homayon

Persarlai Kakar

Mohammad Zaher

287

288

N/A

Hameed N/A

Subtotal:

Farah Province

283

S17.5

Social Mobilizer

Finance Officer

285

S17.1

S17.3

284

286

N

N

IC

S17.6 Engineer

S17.2

EQUIP Officer

S17.4 Social Mobilizer

Engineer

N

N/A

N/A

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$100,092.00 $100,092.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S18.2 FinaICe Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08 Haroun Aseem

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

9 $0.00 $0.00 01-Apr-09 31-Dec-09 N/A

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

9 $0.00 $0.00 01-Apr-09 31-Dec-09 Abdul Hadi N/A

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$62,400.00 $62,400.00

10 Months

& 8 Days

$0.00 $0.00 21-Feb-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $14,196.00 $14,196.00 IC N 01-Apr-10 31-Mar-11 Abdul Momin

Shifted from EQUIP 1

12 $0.00 $0.00 27-Oct-07 26-Oct-08 N/A

12 $0.00 $0.00 27-Oct-08 26-Oct-09

N N/AMohamma

Musa

N/AShir

Mohammad

IC

Social Mobilizer

Engineer

Engineer

N/AMohibullah

S18.5

290

292

289 S18.1

Nimroz Province

IC

291 S18.4

293

294

N

EQUIP Officer

IC

IC

Sultan Rohani N/A

Sayed Ismail

N

Engineer

Subtotal:

Subtotal:

EQUIP Officer

S18.6

S19.1

S18.3 Social Mobilizer

Badghis Province

NIC

N/A

Arash N/A

N

Abdul Karim

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

5 Months

& 3 days

$0.00 $0.00 27-Oct-09 31-Mar-10

12 $11,520.00 $11,520.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

16 Month & 10 Days

$0.00 $0.00 20-Aug-07 31-Dec-08 Mohammad Din Fahim

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08Mohammad

Sadiq

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$84,492.00 $84,492.00

10 Months

& 8 Days

$0.00 $0.00 21-Feb-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

11 $13,200.00 $0.00 01-May-10 31-Mar-11 vacant

15 Months

& 11 Days

$0.00 $0.00 1-Dec-07 30-Nov-08

12 $0.00 $0.00 1-Dec-08 30-Nov-09

S20.1

Habiul Rahman

N

Nasrullah

N

Rahmatgull

N

Shireen N/A

N

Ahmad Shakir Ahmadzai

N/A

N N/A

Sayad Fawad

N/A

Finance Officer

298

296

297

295

299

300

IC

S19.5

S19.4

S19.2

IC

IC

Social Mobilizer

N/A

IC N

Subtotal:

S19.6 Engineer

Engineer

IC

IC

EQUIP Officer

N/A

NIC Faiz Mohammad Mayar

S19.3 Social Mobilizer

Ghor Province

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

16 Months

& 20 Days

$0.00 $0.00 10-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

11 $0.00 $0.00 01-May-10 30-Apr-11 vacant

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 N 01-Jan-09 31-Dec-09 Gul Ahmad N/A

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$60,396.00 $47,196.00

17 $0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 5-Apr-09 4-Apr-10 N/A

$0.00 $0.00

12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 10 Days

$0.00 $0.00 20-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10S21.3

302

301

307

302

303

306

304

305

S20.2 FinaICe Officer Ezatullah Nabil

N

N

Social Mobilizer

IC

N

Haji Najibullah

N/A

S20.3

S20.5

Najeeb-e- Rahman N/A

S20.4 Social Mobilizer

IC

Engineer

N/A

Hakim Khan

IC

Raaz Mohd. Fadai N/A

N/A

IC N

N/A

Mohammad Rahim

S21.1 EQUIP Officer

N

S21.2 Finance Officer

Hamayon

IC

Ghazni Province

S20.6

IC

EngineerSayed Ghaws

Social Mobilizer

IC

Rafiullah

N

Subtotal:

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 23-Oct-07 22-Oct-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$73,764.00 $73,764.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S22.2 FinaICe Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09 Ahmad Jawed N/A

Ghulam Rabani

N

Abdul Qudous Social Mobilizer

IC

IC

S21.4

S21.5 Engineer

IC

Social Mobilizer N/A

N/A

Aziz Ahmad

N

308

310

313

312

311

309

Engineer Mubarak Shah

IC N

N/A

IC

Subtotal:

S21.6

S22.4 N/A

N

N/A

IC N

Noor Mohammad

Social Mobilizer

N/A

Dr. Attiullah Alokozai

S22.1 EQUIP Officer

N

Abdul Ghani

Bamyan Province

S22.3

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$61,764.00 $61,764.00

12 $0.00 $0.00 IC N 21-Mar-09 20-Mar-10 vacant N/A

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S23.2 FinaICe Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08 Abdul Matin

12 $0.00 $0.00 01-Jan-09 31-Dec-09Sayed Ahmad

Reza

3 Months

$0.00 $0.00 IC N 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08 Nasrat Agha

12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad

Haroon

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

S23.6

N/A

N N/A

N

Mohammad Osman

N

S23.5 Engineer

IC

S23.3 Social Mobilizer

Engineer

IC

Akbar Stanikzai

N

Habibullah Rasuly

EQUIP OfficerAmanullah

Mohammad Osman

319

316

320

314

315

317

318

IC N

Esmatullah

N

Sayed Mustafa

IC

N/A

S23.1

S22.5

N/A

S23.4 Social Mobilizer

IC

N/A

S22.6 Engineer

IC

Engineer

N/A

Ahmad Jawed

Logar Province

Subtotal:

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$61,764.00 $61,764.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08 Ezatullah Mudaqiq

9 Months

& 22 Days

$0.00 $0.00 10-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$14,196.00 $14,196.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S24.2 Finance Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,892.00 $11,892.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$61,764.00 $61,764.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

IC

Engineer

IC

Subtotal:

EQUIP Officer

S24.5

N

Nangarhar Province

N

Samiullah N/A

S24.6 Engineer

Mohammad Wali AziziN/A

Hashmatullah

N

N/A

N/A

Haji Assadullah

Zemarak Sardari

N

S24.4

IC

S24.3 Social Mobilizer

IC

Social Mobilizer

S24.1 EQUIP Officer

IC

Akbar Stanikzai

323

326

322

324

325

321

Maidan Wardak Province

Subtotal:

N/A

N N/A

S25.1

IC N

Ali Ahmad Barakzai

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$13,380.00 $13,380.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$10,260.00 $10,260.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

11 $9,680.00 $0.00 01-May-10 30-Apr-11 vacant

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 Months

$0.00 $0.00 01-Jan-10 31-Mar-10

11 $9,680.00 $0.00 01-May-10 30-Apr-11 vacant

$65,416.00 $46,056.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$13,380.00 $13,380.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S26.2 FinaICe Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

N

N

IC

Laghman Province

N/A

IC

330

332

333

334

331

329

328

327 N/A

N/A

Zundai Hafizi N/A

N

Enayatullah

IC

S25.2 FinaICe Officer

S25.3 Social Mobilizer

N

Abdul Haseeb

IC

Mohammad Hassan

N

Social Mobilizer

IC

S25.4

S25.5 Engineer

S25.6 Engineer

IC

N/A

N/A

N

Salih Mohammad

N

Fazil Hadi

Subtotal:

S26.1 EQUIP Officer

N/ARahimullah Alimi

N

Mohammad Nasir Alukozai N/AS26.3 Social Mobilizer

IC

S26.4 Social Mobilizer

IC

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,208.00 $11,208.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$58,212.00 $58,212.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08 Ghulmullah

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $14,400.00 $14,400.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S27.2 FinaICe Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08 Gul Agha

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$62,400.00 $62,400.00

16 $0.00 $0.00 01-Sep-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

Subtotal:

EQUIP Officer

IC

IC N

Mohammad Nabi

S28.1

IC

N

S27.6 Engineer

Zewar shah

N

Sayed Habibullah Pacha

Parwan Province

N/A

N/A

S27.3

N/A

Mohammad Hashim

S27.5 Engineer

IC

Social Mobilizer

S27.4 Social Mobilizer

IC

IC

S27.1 EQUIP Officer

Subtotal:

S26.6

N/A

IC N

N/AGhazi

Mohammad Ashraf

N

S26.5 N/AEngineer

340

341

342

337

335

336

339

338

334 N/ARahimullah Alimi

N

N/A

Engineer

Kunar Province

IC N

N/A

Amanullah

N

Haji Yaar Mullah khan

S26.4 Social Mobilizer

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S28.2 Finance Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$58,212.00 $58,212.00

16 Months

& 17 Days

$0.00 $0.00 13-Aug-07 31-Dec-08 Zabiullah Saidy

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 24-Nov-07 23-Nov-08

12 $0.00 $0.00 24-Nov-08 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08 Amina Naeemi

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

IC

N/A

S29.4 Social Mobilizer

N

N/A

Mohammad Zareef N/A

EQUIP Officer

N

IC

S28.1 Sayed Habibullah Pacha

Subtotal:

Social Mobilizer

347

349

342

343

350

345

346

348

344

N/A

N/A

N

Abdul Hadi N/A

N

S28.3 Social Mobilizer

IC

S28.4

S28.5 Engineer

IC

Mohammad Osman

Mohammad Younis

S28.6 Engineer

IC

N/A

Kapisa Province

N

IC

N/A

S29.3 Social Mobilizer

IC

Finance OfficerS29.2

Abdul Qahir

N

Najib ur Rahman

N

N/AAhmad Ali

N

S29.1

IC

EQUIP Officer

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$69,732.00 $69,732.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 29-Nov-07 28-Nov-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$11,520.00 $11,520.00

01-Apr-10 31-Mar-11 salim

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

N

IC

Engineer

N/A

Subtotal:

Social Mobilizer

IC

Shirpoor

Sebghatullah

Mohammad Nasir

Mohd. Esa

N/A

N/A

N/A

N/A

S29.4 Social Mobilizer

N/A

N/A

Abdul Qayoum

351

352

353

358

355

357

350

354

356

Abudl Zaher

N

N/A

N

Abdul Rahman

N

EQUIP Officer

IC

S29.6 Engineer

IC

S29.5

IC

Engineer

IC

Sayed Qasim Social Mobilizer

IC

Zekaria

Panjshir Province

S30.1

NIC

N

S30.3

N

N

S30.4

FinaICe Officer

Engineer

S30.6

S30.5

S30.2

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$69,732.00 $69,732.00

359 S31.1 EQUIP Officer 12 $14,400.00 $0.00 IC N 01-Apr-10 31-Mar-11 vacant N/A

S31.2 FinaICe Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

11 $9,680.00 $9,680.00 01-May-10 30-Apr-11 vacant

$57,704.00 $43,304.00

17 Months

$0.00 $0.00 01-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $9,600.00 $9,600.00 01-Apr-10 31-Mar-11 Farhad Haidari

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

IC

S32.3366

Engineer

S32.4 Social Mobilizer

S32.5

NIC

Mirwais

N/AHaji Shahbaz

N/A

Lal Gul

N/A

N/A

IC

IC

IC

Abdullah

Samangan Province

N

N

N

S32.2

N/A

N

N/A

N/A

Mohammad Hussain

368

365

361

362

367

364

363

360

Horia

S32.1 EQUIP Officer

Social Mobilizer

Abdul Azim

IC

Finance Officer

S31.6 Engineer

S31.4

Subtotal:

N Farid AhmadIC

N

Social Mobilizer

N/A

S31.3 Social Mobilizer

Subtotal:

S31.5 Engineer

Hekmatullah

IC

Kunduz Province

N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08Basir

Mohammad

7 Months

& 5 Days

$0.00 $0.00 27-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10Sardar

Mohammad

10 $0.00 $0.00 01-Jun-10 30-Apr-11 vacantshifted from equip1

$56,604.00 $56,604.00

12 $0.00 $0.00 20-Sep-07 19-Sep-08 Mohammad Ayoub

7 Months

& 15 Days

$0.00 $0.00 17-May-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

S33.2 Finance Officer

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Vacant N/A

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09 Abdul Latif

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$0.00 $0.00

$58,212.00 $58,212.00

15 Months

& 11 Days

$0.00 $0.00 IC N 20-Sep-07 31-Dec-08

12 $0.00 $0.00 16-July-o7 15-Jul-08

EQUIP Officer

Social Mobilizer

S34.1

369

N

Engineer

S33.6

Engineer

IC

Engineer

Abdul Hadi Atefi

370

371

IC

IC

IC

N/A

IC N

N/AMohammad Rasoul

Bahawoodin

373

375

372

374

Subtotal:

N/A

N

Subtotal:

EQUIP Officer

N

S32.6 Engineer

Balkh Province

N/A

IC

S33.3

S33.1

S33.4 Social Mobilizer

N

Faryab Province

Hamidullah

S33.5

N/A

Abdul Bashir

N

Nasrullah

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 01-Jan-09 31-Dec-09

11 $13,200.00 $0.00 1-May-10 31-Mar-11 vacant

S34.2 Finance Officer 12 $0.00 $0.00 16-July-o7 15-Jul-08 vacant N/A

12 $0.00 $0.00 01-Jan-09 31-Dec-09 Hedaytullah

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 IC N 16-July-o7 15-Jul-08

12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10Esmatullah/ Mir

AsdullahN/A

9 $0.00 $0.00 01-Apr-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Bashir Ahmad N/A

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$60,876.00 $47,676.00

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

15 Months

& 11 Days

$0.00 $0.00 20-Sep-07 31-Dec-08

12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10 N/A

129600 9600 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 4-Aug-07 03-Aug-08

12 $0.00 $0.00 4-Aug-08 03-Aug-09

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

381 Finance OfficerS35.2

Syed Ahamad raza

Haji Omar

Subtotal:

Ghulam Ishan

N/A

IC

Social MobilizerS34.3

Abdul Karim

abdul hafiz

N/A

IC

N/A

IC

N/A

NIC

377

378

380

376

S35.1

S35.4 Social Mobilizer

Social Mobilizer

Engineer

S34.5

EQUIP Officer

Engineer

S35.3 Social Mobilizer

383

382

IC

IC

NIC

N

N/A

N/A

N

Abdul Malik

Esmatullah

Muhammad Barat

IC

S34.4 Sayed Habib Saeed

N

N

N

379 S34.6

Juzjan Province

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

9 months

$0.00 $0.00 1-Apr-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 IC 01-Jan-10 31-Mar-10 Sayedullah N/A

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$67,812.00 $67,812.00

12 $0.00 $0.00 31-Aug-07 30-Aug-08

12 $0.00 $0.00 31-Aug-08 30-Aug-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 5-Dec-07 4-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

11 $10,000.00 $0.00 01-Jun-10 31-Mar-11 vacant

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 4-Aug-07 03-Aug-08

12 $0.00 $0.00 4-Aug-08 03-Aug-09

12 $11,208.00 $11,208.00 01-Apr-10 01-Apr-10

Shifted from EQUIP 1

12 $0.00 $0.00 4-Aug-07 03-Aug-08

12 $0.00 $0.00 4-Aug-08 03-Aug-09

12 $0.00 $0.00 4-Aug-09 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $0.00 $0.00 4-Aug-09 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$66,040.00 $56,040.00

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Dr. Shekib

12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$13,380.00 $13,380.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

EQUIP Officer

N

N/A

N/A

N

N/A

Sayed Nasir

385

384

387

386

388

Social Mobilizer

IC

S36.2 Finance Officer

S35.6

N/A

Abdul Baheer

392

390

S37.1 EQUIP Officer

S36.6 Engineer

IC

Takhar Province

N/A

Subtotal:

Zabiullah

Social Mobilizer

EngineerS36.5

N

S36.4

S36.3

389

391

NIC

IC

IC

IC

N

N

IC

N/A

N/A

N/A

Samar Gul

Khwaja Asadullah

Mohammad Raqib

Saripul Province

Engineer

S35.5 Engineer

Subtotal:

S36.1

Bashir Ahmad

Mohd. Saber

N

Aziz

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $10,260.00 $10,260.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Rahila

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10

14 Months

& 25 Days

$0.00 $0.00 7-Oct-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Khyberullah

13 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

$68,472.00 $68,472.00

S38.1 ICT Officer for Kart-e-Char office12 $0.00 $0.00 07-Nov-08 31-Dec-09 vacant N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $7,200.00 $7,200.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 07-Nov-07 06-Nov-08

12 $0.00 $0.00 07-Nov-08 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $7,200.00 $7,200.00 01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Feb-07 31-Jan-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10 s

12

$23,556.00 $23,556.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

15 $0.00 $0.00 IC N 01-Oct-07 31-Dec-08

$0.00 $0.00

12 $0.00 $0.00 26-Apr-07 27-Apr-08 Vacant

8 Months

& 3 Days

$0.00 $0.00 28-Apr-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

N/A

N/A

N/A

Engineer

N

399

400

N

N

Ahmad Salim

N

N

394

396 S37.5 Engineer

S37.4395 Social Mobilizer

Sayed Abid

IC

S37.3 Social Mobilizer

IC

Haroon Asim

IC

S37.2 Finance Officer393

398

Subtotal:

ICT MANAGEMENT UNIT TEAM

N/AZabiullah 397 S37.6

S38.2 Technician for Simultaneous & Video conferencing equipment Ahmad Jaweed N/A

IC N

N/A

IC N

N/AShamshad Ayoubi

Ahmad Zia

Ahmad Shah

IC

Technician for Simultaneous & Video conferencing equipment

IC

Web Developing Officer

401

S38.3

S38.4

S38.5 Programming Officer

Amir Mohd

N/A

IC N

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$21,216.00 $21,216.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Mar-07 28-Feb-08

8 Months

& 16 Days

$0.00 $0.00 15-Apr-08 31-Dec-08

12 $0.00 $0.00 30-May-09 29-May-10

10 $8,055.00 $8,055.00 30-May-10 31-Mar-11

Shifted from EQUIP 1

7 Months

& 7 Days

$0.00 $0.00 01-Apr-07 07-Nov-07

12 $0.00 $0.00 24-Nov-07 23-Nov-08

12 $0.00 $0.00 24-Nov-08 31-Dec-09 Abdul Wali

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$9,600.00 $9,600.00

01-Apr-10 31-Apr-11

Shifted from EQUIP 1

12 $0.00 $0.00 01-Apr-07 31-Mar-08

8 Months

& 8 Days

$0.00 $0.00 23-Apr-08 31-Dec-08

12 $0.00 $0.00 30-May-09 29-May-10Mohammad

Akbar

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$9,600.00 $9,600.00

01-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 17-Mar-07 16-Mar-08

9 Months

& 15 Days

$0.00 $0.00 17-Mar-08 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08

12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08

11 $9,119.00 $0.00 01-Jun-10 30-Apr-11 vacant

S38.11 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.12 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.13 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.14 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.15 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.16 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.17 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.18 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.19 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.20 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.21 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.22 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.23 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.24 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.25 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.26 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.27 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.28 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.29 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.30 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.31 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.32 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.33 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.34 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

N

S38.10 Help Desk Officer/Assistant (@$9600 per year)

IC

405

Network Officer

IC

Help Desk Officer/Assistant (@$9600 per year)

S38.7

IC

Help Desk Officer/Assistant (@$9600 per year)

N

N

403

404

N/A

Musadiq

N/A

Hedayatullah Hamdard

Shakir habibyar

Ahmad Shah Wardak

402 S38.6

406

S38.9

Imranulhaq

S38.8 Help Desk Officer/Assistant (@$9600 per year)

N/AMansoor Ahmad

N/A

Mohammad Akbar

N/AMohammad Shafi

IC N

Hedayat ullah Hamdard

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

S38.35 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.36 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.37 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.38 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.39 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.40 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.41 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.42 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S38.43 Provincial IT Officers 4 $0.00 $0.00 IC N 01-Feb-08 30-Jun-08 Vacant N/A

S38.44 Provincial IT Officers 17

Months$0.00 $0.00 Vacant N/A

S38.45 IT Project Design Advisor - International- $0.00 $0.00 - - - - N/A

$95,546.00 $86,427.00

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

15 $0.00 $0.00 IC N 1-Oct-07 31-Dec-08

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $14,400.00 $14,400.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

408 S40.2 Finance Officer 12 $0.00 $0.00 01-Jan-09 31-Dec-09 Vacant N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

17 $0.00 $0.00 1-Aug-07 31-Dec-08

12 $0.00 $0.00 01-Jan-09 31-Dec-09

12 $12,000.00 $12,000.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $0.00 $0.00 01-Jan-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

9 $0.00 $0.00 01-Apr-09 31-Dec-09Mohammad

Akbar Stanekzai

N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 1-Apr-10 31-Mar-11

Shifted from EQUIP 1

5 $0.00 $0.00 01-Aug-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

$62,400.00 $62,400.00

2 $0.00 $0.00 IC N 01-Sep-06 30-Oct-06

12 $0.00 $0.00 01-Oct-06 30-Sep-07

S39.2 Procurement Officer 14 $0.00 $0.00 01-Nov-07 31-Dec-08 Hamidullah N/A

11 Months

& 30 Days

$0.00 $0.00 02-Jan-08 31-Dec-08

12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08

2 $0.00 $0.00 IC N 01-Sep-06 30-Oct-06 Mansoor

S39.3 Finance Officer 12 $0.00 $0.00 01-May-07 30-Apr-08Habibullah

HabibN/A

S39.4 Admin Officer 8 $0.00 $0.00 01-May-08 31-Dec-08 Redwan N/A

12 $0.00 $0.00 IC Y 01-Mar-07 28-Feb-08

12 $0.00 $0.00 IC N 01-Sep-06 31-Aug-07

S39.6 Technical Advisor @ US$58,500/yr each7 $0.00 $0.00 IC N 01-Sep-06 31-Mar-07 Vacant N/A

S39.5

S40.5 Engineer

S40.4 Social Mobilizer

S40.1407 N/AEQUIP Officer

Paktia Province

411

410

Social Mobilizer409 N/A

IC N

N/A

IC N

Mohammad Din

Asem Jan

Teacher Education Program

IC N

Ziaullah HashmiN/A

Subtotal:

IC N

Shafaq Ikhlas

S39.2

Abdul Haq Rahmaty

N/AS39.1 Program coordinator

Ahmad Samim N/A

IC N

IT IICharge Officer

Procurement Officer

412

Subtotal

S40.6 Egineer

Shamsulhaq

N/A

Faizanullah Patan

Mohammad Sardar

S40.3

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

S39.7 Core Trainers @US$4200/yr each forTraining section & Supervision/evaluation section7 $0.00 $0.00 01-Sep-06 31-Mar-0715 filled & 26

Vacant N/A

S39.9 Computer Operator 12 $0.00 $0.00 25-Apr-07 24-Apr-08 Rohullah N/A

8 Months

& 6 Days

$0.00 $0.00 25-Apr-08 31-Dec-08 Hameed

12 $0.00 $0.00 01-Jan-09 31-Dec-09

5 $0.00 $0.00 01-Nov-06 31-Mar-07

12 $0.00 $0.00 25-Apr-07 24-Apr-08

8 Months

& 6 Days

$0.00 $0.00 25-Apr-08 31-Dec-08 Asifullah

7 $0.00 $0.00 IC N 01-Sep-06 31-Mar-07

23 $0.00 $0.00 01-Feb-07 31-Dec-08

S39.12 Office Assistant - TED 12 $0.00 $0.00 01-Jan-09 31-Dec-09 Mohabat N/A

15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08

15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08

S39.14 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.15 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.16 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.17 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.18 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.19 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.20 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.21 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.22 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.23 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.24 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.25 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.26 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.27 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.28 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.29 Supervisor for ILE&C 15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A

S39.30 Supervisor for ILE&C 3 $0.00 $0.00 IC N 01-Feb-07 30-Apr-07 Vacant N/A

S39.31 Supervisor for ILE&C 3 $0.00 $0.00 IC Y 01-Feb-07 30-Apr-07 Vacant N/A

S39.32 Core Trainers ( 22 Staff Members) @US$250/month for AITE - 1 semester3 $0.00 $0.00 IC N 01-Feb-07 30-Apr-07 Vacant N/A

S39.33 Trainers (200 Staff Members) @US$120/month for AITE - 1 semester$0.00 $0.00 Vacant N/A

S39.34 Admin. Staff (44 Staff Members) for AITE @US$120/month - 1 semester$0.00 $0.00 Vacant N/A

$0.00 $0.00

12 $0.00 $0.00 10-Dec-07 9-Dec-08

$0.00 $0.00 10-Dec-08 28-Feb-09

12 $0.00 $0.00 10-Dec-07 9-Dec-08

2 $0.00 $0.00 10-Dec-08 28-Feb-09

CS41.3 Advisor Curriculum Development-Mathematics12 $0.00 $0.00 SSS Y 15-Dec-07 14-Dec-08Mr. Nangyalai

ArsalaN/A

12 $0.00 $0.00 17-Jan-08 30-Dec-08Ghulam Faruq

Khapulwak

5 $0.00 $0.00 1-Mar-09 31-Jul-09Extension dropped

12 $0.00 $0.00 10-Dec-07 9-Dec-08

10 $0.00 $0.00 1-Mar-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$18,000.00 $18,000.00

1-Mar-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Feb-08 30-Dec-08

2 $0.00 $0.00 10-Dec-08 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09

12 $0.00 $0.00 5-Mar-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 10-Dec-07 9-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS41.2 Snr. Subject Specialist-Mathematics

CS41.5

CS41.7

Evaluation officer for TEDS39.13

CS41.1 Snr. Subject Specialist-Mathematics

General Education

Subtotal:

N/AAbdul Nabi

Wahidi

CS41.4 Snr. Subject Specialist-Environmental Science

S39.11 Computer Operator

S39.10 Computer Operator

N

IC

Abdullah

IC N

Nasratullah

IC

N

N/AHamidi

N/A

N/A

NIC

N/A

N/AIC N

CS41.8

Snr. Subject Specialist-Chemistry N

Advisor Curriculum Development-Chemistry

IC

413

IC N

Hussain Ali Ramozi

CS41.6

N/A

NMohd Hassan

Nazar Mohammad

HalimIC

N/A

N/A

N N/A

Snr. Subject Specialist-Physics IC

IC Mohd Qasim Jamdar

N

Advisor Curriculum Development-Physics

Gul Ahmad Saghari

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

10 $0.00 $0.00 1-Mar-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

CS41.9 Snr. Subject Specialist-Biology 12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08Hayatullah

NaserN/A

12 $0.00 $0.00 15-Dec-07 14-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$15,600.00 $15,600.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 15-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$21,600.00 $21,600.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 15-Dec-07 14-Dec-08

$0.00 $0.00 15-Dec-08 28-Feb-09

10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $0.00 $0.00 15-Dec-07 14-Dec-08

$0.00 $0.00 15-Dec-08 28-Feb-09

10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS41.14 Snr. Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A

12 $0.00 $0.00 39515 39812

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$24,000.00 $24,000.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 20-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$21,600.00 $21,600.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 31-Jan-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 15-Dec-07 14-Dec-08

2 months 15 days

$0.00 $0.00 15-Dec-08 28-Feb-09

10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$15,000.00 $15,000.00

1-Apr-10 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 1-Feb-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS41.20 Snr. Subject Specialist-Baloochi Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A

416

IC

Snr. Subject Specialist-Pashtu Literature IC

IC

Shafiqa Yarqin

IC N/AN

CS41.17

Snr. Subject Specialist-Pashtu Literature

CS41.19 Snr. Subject Specialist-Turkmani Literature

420 CS41.18 Snr. Subject Specialist-Uzbaki Literature

Snr. Subject Specialist-Pashtu Literature

419

417

418 CS41.16

Snr. Subject Specialist-Dari Literature

CS41.15

Snr. Subject Specialist-Dari Literature

Snr. Subject Specialist-Pashtu Literature

IC

CS41.12 Snr. Subject Specialist-Civil Information

415 CS41.11 Snr. Subject Specialist-Geography

IC

IC

IC

IC

Snr. Subject Specialist-Dari Literature

414 CS41.10 Snr. Subject Specialist-History

CS41.13

CS41.8 Advisor Curriculum Development-Chemistry

N

N N/A

Salimi

N/A

Hamidullah Weda

N/A

Ghulam Farooq Ansari

N/A

Ghulam Jilani Aarez

N

Baryalay Bajauray

N/A

N

N/A

N/A

N

Aziz Bakhtiari

Abdul Sabor Fakhri

Mohd Qasim Heelaman

N

Asaadullah Muhaqqique

N

N/ANAbdul Karim

Nazar

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 3-Mar-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS41.22 Snr. Subject Specialist-Nooristani Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A

12 $0.00 $0.00 17-Jan-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 20-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

Snr. Subject Specialist-Arabi Literature10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

CS41.25 Snr. Subject Specialist-English Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A

CS41.26 Snr. Subject Specialist-English Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A

12 $0.00 $0.00 16-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $0.00 $0.00 17-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

Snr. Subject Specialist-Islamic Education 10 $0.00 $0.00 01-Mar-09 31-Dec-09 Dropped

Snr. Subject Specialist-Arts & Culture $0.00 $0.00 IC N 15-Dec-08 28-Feb-09Sayeed Abdullah Framarz

N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Vacant,Amount reduced

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$13,500.00 $13,500.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 01-Mar-09 31-Dec-09

$0.00 $0.00 10-Dec-08 28-Feb-09

CS41.30 Snr. Subject Specialist-Computer10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Rasuol Zahir

Snr. Subject Specialist-Computer12 $0.00 $0.00 IC N 15-Dec-08 28-Feb-09 N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$21,600.00 $21,600.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

$186,900.00 $186,900.00

12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08Mohammad

MuzamelN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Snr. Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 16-Dec-07 15-Dec-08 N/A

$0.00 $0.00 15-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

Snr. Subject Specialis-Arabic Language12 $0.00 $0.00 IC N 39467 39812 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$19,200.00 $19,200.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 17-Jan-08

39812

Ezatullah N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N39469 39812

Sher Ali Zarifi N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Saduddin Shpoon

CS41.30 Advisor Curriculum Development-Art & Culture IC

424

Subtotal:

423

CS41.29

Snr. Subject Specialist-Arts & Culture

422

CS42.4

CS41.28Snr. Subject Specialist-Islamic Education

CS41.24Snr. Subject Specialist-Arabi Literature

CS41.27

Snr. Subject Specialist-Islamic Education

Snr. Subject Specialist-Islamic Education

Snr. Subject Specialis-Arabic LanguageCS42.5

CS41.31

Center for Excellence

Snr. Subject Specialis-Quran Majid

Snr. Subject Specialist-Computer

CS42.2

CS42.1

Enayatullah Khalil

421 CS41.21

Snr. Subject Specialist-Pashayee Literature

Snr. Subject Specialist-Pashayee Literature

ICCS41.23 Snr. Subject Specialist-Pmiri Literature

N/AIC

CS42.6

N/ANKhair

Mohammad

N

Hafiza Rahimi

N/A

N

Taj Mohammd Wahidyar

IC

N/A

N/A

Abdul Hameed Aatif

IC

N/AN

IC

Abdul Hai Moqim

N

Ehsanullah

NAbdul Wahab

Mohammad Amin Waqaad

Snr. Subject Specialis-Arabic Language

Snr. Subject Specialis-Hadis Sharif

Snr. Subject Specialis-Sirat Nabi

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

Snr. Subject Specialis-Feqa12 $0.00 $0.00 IC N 16-Dec-07 15-Dec-08 N/A

$0.00 $0.00 16-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 N/A

$0.00 $0.00 15-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$18,000.00 $18,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 29-Mar-08 30-Dec-08Mohammad Zaki Ehsani

N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Snr. Subject Specialis-Pedagogy & Psychology12 $0.00 $0.00 IC N 16-Dec-07 15-Dec-08 N/A

$0.00 $0.00 16-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 39511 39812 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$21,600.00 $21,600.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 25-Feb-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Snr. Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Shafiq Samim N/A

$0.00 $0.00 15-Dec-08 28-Feb-09

Snr. Subject Specialis-Usool Faq10 $0.00 $0.00 01-Mar-09 31-Dec-09 vacant N/A

Snr. Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 21-Feb-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Snr. Subject Specialis-Aqayed & Adyan10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

Snr. Subject Specialis-Feqa12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

Snr. Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 N/A

$0.00 $0.00 15-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

9 days $0.00 $0.00 1-Jan-10 09-Jan-10

3 $0.00 $0.00 10-Jan-00 31-Mar-10

12

$42,000.00 $42,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

Mohammad Yousuf Niazi

Shair Ali Zarifi

Snr. Subject Specialis-Feqa

CS42.14

CS42.17

Snr. Subject Specialis-Usool Feqa

CS42.15

Snr. Subject Specialis-Feqa

430

CS42.16

CS42.12 Snr. Subject Specialis-Hadis Sharif

428 CS42.11

CS42.7

Snr. Subject Specialis-Hadis Sharif

Snr. Subject Specialis-Pedagogy & Psychology

427

CS42.9

CS42.8

CS42.10

426

429

CS42.13

Snr. Subject Specialis-Usool Feqa

Snr. Subject Specialis-Feqa

425Sayed Abdul

Wahab Rahmani

Mohammad Baqir Jafari

Nematullah Mahmoodi

Assadullah Hanif

Mohammad Jawad Salihi

Shah Wali Allah Adeb

Ghulamudin Kalantari

Abdul Hamid Mohammadi

Snr. Subject Specialis-Usool Feqa

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

Snr. Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Khalilurahman

HenaniN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

CS42.19 Snr. Subject Specialis-Arabic Language10 $0.00 $0.00 01-Mar-09 31-Dec-09 Deleted.

CS42.20 Snr. Subject Specialis-Arabic Language10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant

10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant

7 $0.00 $0.00 01-Jul-09 29-Jan-10 Wali

3 $0.00 $0.00 01-Feb-10 31-Mar-10

12 $18,000.00 $18,000.00 1-Apr_10‘ 31-Mar-11 from

10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$13,200.00 $13,200.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant

3 $0.00 $0.00 1-Jan-10 31-Mar-10 Khan Shireen

CS42.24 Snr. Subject Specialis-Pedagogy & Psychology10 $0.00 $0.00 01-Mar-09 31-Dec-09 Deleted.

CS42.25 Specialis - TVT 10 $0.00 $0.00 01-Mar-09 31-Dec-09 Deleted.

$168,000.00 $168,000.00

12 $0.00 $0.00 1-Feb-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

CS43.1Snr. Subject Specialist Human Rights

7 $0.00 $0.00 IC N 01-Mar-09 30-Sep-09Extension dropped

N/A

CS43.2 Snr. Subject Specialist Human Rights12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.3 Snr. Subject Specialist Gender12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.4 Snr. Subject Specialist Health12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.5 Snr. Subject Specialist Counter Narcotics12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.6 Snr. Subject Specialist Mine Awarness12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.7 Subject Editor (Gender) 12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.8 Subject Editor (Gender) 12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

12 $0.00 $0.00 24-Mar-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

CS43.9Subject Editor (Human Rights)

7 $0.00 $0.00 IC N 01-Mar-09 30-Sep-09Extension dropped

N/A

CS43.10 Subject Editor (Envoirnement)12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS43.11 Subject Editor (Health) 12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

12 $0.00 $0.00 3-Mar-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$18,000.00 $18,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 24-Mar-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

$18,000.00 $18,000.00

CS44.1 Sub Editor-Dari 12 $0.00 $0.00 IC Y 39539 39812 Said Faruq Farani N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor-Dari 12 $0.00 $0.00 IC Y 39539 39812 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor-Dari 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

CS44.3 Sub Editor-English 12 $0.00 $0.00 IC Y 39539 39812 Ehsan Azari N/A

$0.00 $0.00

Ahmad Yaseen Farkhari

CS43.13Subject Editor (Afghan Culture Values)

IC N

Subtotal:Senior Editor

N/A

CS44.2

Abdul Ghafoor Qarar

CS42.18

Snr. Subject Specialis-Flasafa Islamic

CS42.22 IC

Snr. Subject Specialis-English Language

Abdul Zahir Modaqiq

N

Roya Rahimi

CS42.21

432

433

Mohammad Azim Karbalai

Snr. Subject Specialis- Physics

Snr. Subject Specialis-English Language

N/A

Cross Cutting

CS43.1Snr. Subject Specialist Human Rights

IC N

Subtotal:

CS42.23

Salma

ICSubject Editor (Human Rights)

Subject Editor (Islamic Principles)

CS43.12

Subject Editor (Islamic Principles)IC

CS43.9 N N/A

N/A

Qiaumdin Kashaf

N

Abdul Wasi

431

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

Sub Editor-Histori 12 $0.00 $0.00 IC Y 39539 39812 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor-Histori 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

CS44.5 Sub Editor-Histori 12 $0.00 $0.00 IC Y 39539 39812Ghulam Ahmad

WaakN/A

$0.00 $0.00

CS44.6 Sub Editor (Mathematics) 12 $0.00 $0.00 IC Y 39539 39812Mohammad Nasir Chafie

N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC Y 39539 39812 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

9 $26,550.00 $0.00 01-Jul-10 30-Apr-11 Vacant

CS44.8 Sub Editor (Pashtu Literature)12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 Vacant N/A

$0.00 $0.00

12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

12 $0.00 $0.00 IC Y 39539 39812Eshaq

NegaargarN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS44.11 Sub Editor (Pedagogy) 12 $0.00 $0.00 IC Y 13-Apr-08 30-Dec-08 Farida Akram N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor (Physics) 12 $0.00 $0.00 IC Y 39539 39812 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor (Physics) 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

CS44.13 Sub Editor (Physics) 12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 Vacant N/A

$0.00 $0.00

Sub Editor (Georgraphy) 12 $0.00 $0.00 IC Y 1-Apr-08 39812 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor (Georgraphy) 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

CS44.15 Sub Editor (Computer) 12 $0.00 $0.00 IC Y 1-Apr-08 39812Abdul Qadir

WadanN/A

$0.00 $0.00

CS44.16 Sub Editor (Chemistry) 12 $0.00 $0.00 IC Y 1-Apr-08 39812Shawkat Ali

ShefaN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS44.17 Sub Editor (English Literature)12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 Vacant N/A

$0.00 $0.00

CS44.18 Sub Editor (Environment & Pedagogy)12 $0.00 $0.00 IC Y 1-Apr-08 39812 Sharifa Sharif N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor (Pashtu Literature)12 $0.00 $0.00 IC Y 15-Jul-08 31-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Sub Editor (Pashtu Literature)10 $0.00 $0.00 01-Mar-09 30-Dec-09 N/A

Language Editor-Pamiri 12 $0.00 $0.00 IC Y 1-Apr-08 39812Mohammad

SaberN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Language Editor-Pamiri 10 $0.00 $0.00 01-Mar-09 30-Apr-09Mohammad

SaberN/A

CS44.21 Subject Editor-Mathematics12 $0.00 $0.00 IC Y 39539 39812 Azizullah Aral N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

$26,550.00 $0.00

CS45.1 Snr. Technical Specialist/ Graphic Designer12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

CS45.2 Snr. Technical Specialist/ Graphic Designer12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A

$0.00 $0.00

12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 N/A

$0.00 $0.00 IC N 22-Dec-08 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

Rahmatullah Zwakman

Graphic Designer

Subtotal:Subject Specialist

CS44.14

Subtotal:

CS44.19

Mr. Mohammad Ashooq Gharib

Sub Editor (Mathematics)

CS44.4

CS44.12

CS44.7

CS44.10

Sub Editor (Pashtu Literature)

Rasul Bawari

Mohammad Zarin Anzoor

Makhan Shinwari

Telabaz Habibzai434

CS44.9

Sub Editor (Dari Literature)

CS44.20

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08

2 $0.00 $0.00 IC N 23-Dec-08 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

Subject Specialist-Mathematics12 $0.00 $0.00 IC N 39560 39812 N/A

$0.00 $0.00 IC N 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.6 Subject Specialist-Mathematics12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A

$0.00 $0.00

CS46.7 Subject Specialist-Mathematics12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A

$0.00 $0.00

CS46.8 Subject Specialist-Environmental Science12 $0.00 $0.00 IC N 29-Apr-08 30-Dec-08 Sayed Bahadur N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.9 Subject Specialist-Environmental Science12 $0.00 $0.00 IC N 11-Mar-08 30-Dec-08Hedayatullah

HedayatN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.13 Subject Specialist-Environmental Science12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A

$0.00 $0.00

CS46.14 Subject Specialist-Physics 12 $0.00 $0.00 IC N 26-Mar-08 30-Dec-08Shir

MohammadN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.15 Subject Specialist-Physics 12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A

$0.00 $0.00

CS46.16 Subject Specialist-Chemistry12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08Besmillah Wali

AhmadZaiN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 N/A

2 $0.00 $0.00 22-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

$0.00 $0.00 IC N 23-Dec-08 22-Dec-08 Abdul Qudos N/A

$0.00 $0.00

10 $0.00 $0.00 01-Mar-09 31-Dec-09 Abdul Ghafor G N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

440

435

437

438

436

439

CS46.4

CS46.17

CS46.11

CS46.10

Obaidullah Safi

Subject Specialist-MathematicsHamdullah

SherzaiCS46.2

CS46.1 Mehria

Subject Specialist-Biology

Subject Specialist-Chemistry

Subject Specialist-Environmental Science

Mohammad Anwar

Sarbuland

Sayed Mawjod Shah

12

Subject Specialist-Environmental Science

Abdul Mohammad

Aziz

Subject Specialist-Mathematics

Subject Specialist-Mathematics

CS46.19

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.21 12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.21 10 $0.00 $0.00 01-Mar-09 31-Mar-09 N/A

8.75 $0.00 $0.00 7-Apr-08 31-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $24,000.00 $24,000.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 13-Jan-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08 Vacant N/A

$0.00 $0.00

10 $0.00 $0.00 01-Mar-09 31-Dec-09Hayatullah

NasarN/A

12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08Kazimia Sadat

MohaqiqN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08 Safura Mazari N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08Kazimia Sadat

MohaqiqN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08 Safura Mazari N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.30 Subject Specialist-Civil Information12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08 Vacant N/A

$0.00 $0.00

12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $16,800.00 $16,800.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Mohammad

Nasem FaqeriN/A

$0.00 $0.00 10-Dec-08 28-Feb-09

12 $0.00 $0.00 IC N 10-Dec-07 9-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 15-Mar-08 30-Dec-08Mohd Afzal

BanuwalN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09Mohd Afzal

Banuwal

444

442

443

Subject Specialist-HistoryShah Sanam

Omari Jabarkhil

CS46.28

Hayatullah Nasar

Zalmai HottakCS46.22 Subject Specialist-History

CS46.27 Subject Specialist-Geography

Subject Specialist-Geography

Subject Specialist-Biology

441

Subject Specialist-Dari LiteratureCS46.34

Subject Specialist-Dari Literature

CS46.26

CS46.32

Subject Specialist-Dari Literature

CS46.29 Subject Specialist-Civil Information

Subject Specialist-GeographyCS46.24

CS46.25

CS46.33

CS46.31

Subject Specialist-Civil Information

Subject Specialist-Dari Literature

Mohd Faroq

Abdul Raziq Asmar

Sayed Mahmood

Khaliq

Mohammad Raziq Bahir

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

CS46.35 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 15-Mar-08 30-Dec-08Ikramuddin Hessaryan

N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.36 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 22-Apr-08 30-Dec-08Shujauddin Khorasani

N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.37 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 24-Dec-07 23-Dec-08 Vacant N/A

$0.00 $0.00

CS46.38 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 Zohour Zohouri N/A

$0.00 $0.00 24-Dec-08 28-Feb-09

12 $0.00 $0.00 IC N 25-Mar-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 24-Dec-07 23-Dec-08Said Ahmad

Momand

2 $0.00 $0.00 01-Jan-09 28-Feb-09Said Ahmad

Momand

10 $0.00 $0.00 01-Mar-09 31-Dec-09 Abdul Rahim N/A

$0.00 $0.00

12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $0.00 $0.00 IC N 21-Feb-08 30-Dec-08Mohd Hakim

TaniwalN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Nematullah

AnderN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 30-Jan-08 30-Dec-08Mohd Aajan

HaqpalN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 12-Feb-08 30-Dec-08Sayed

MohaiuddinN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.46 Subject Specialist-Pashtu Literature12 $0.00 $0.00 IC N 20-Apr-08 30-Dec-08Abdul Qayum

MushwaniN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.47 Subject Specialist-Pashtu Literature12 $0.00 $0.00 IC N 24-Apr-08 30-Dec-08Mohammad Asif

SamimN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Subject Specialist-Pashtu Literature12 $0.00 $0.00 IC N 20-Apr-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Subject Specialist-Pashtu Literature10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Burhanuddin

NamiqN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Mohd Halim

YarqinN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 Hafizullah Rahiq N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Hafizullah

OufonN/A

CS46.42

CS46.52

CS46.43

CS46.49

445

CS46.44

CS46.41

CS46.39

Subject Specialist-Pashtu Literature

Subject Specialist-Pashtu Literature

Subject Specialist-Pashtu Literature

CS46.40

Subject Specialist-Pashtu Literature

Subject Specialist-Pashtu Literature

Subject Specialist-Dari Literature Farzana

Hazrat Gul Archiwal

Subject Specialist-Uzbaki LiteratureCS46.50

CS46.51 Subject Specialist-Uzbaki Literature

Subject Specialist-Turkmani Literature

Subject Specialist-Pashtu LiteratureCS46.45

CS46.48

Subject Specialist-Uzbaki Literature

Nasim Gul Totakhail

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

2 $0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.54 Subject Specialist-Turkmani Literature12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08Abdul Aziz

OmarN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS46.55 Subject Specialist-Baloochi Literature12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Ghulam Sakhi

WakilzadaN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 1-Apr-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.57 Subject Specialist-Baloochi Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08Mohammad

NadirN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.58 Subject Specialist-Pashayee Literature12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Ghulam Sediq

ShenganakN/A

$0.00 $0.00 25-Dec-08 28-Feb-09

CS46.59 Subject Specialist-Pashayee Literature12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Mohammad

Hasan HesamN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.60 Subject Specialist-Pashayee Literature12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Mohammad

NadirN/A

$0.00 $0.00 25-Dec-08 28-Feb-09

CS46.61 Subject Specialist-Nooristani Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Khosh Nazar N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Munawar Khan N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09 Munawar Khan

10 $0.00 $0.00 01-Mar-09 31-Dec-09Khosh Nazar

PamirzadN/A

Subject Specialist-Nooristani Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Subject Specialist-Nooristani Literature10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

CS46.64 Subject Specialist-Pamiri Literature12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 Khosh Nazar N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $18,000.00 $18,000.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.65 Subject Specialist-Pamiri Literature10 $0.00 $0.00 01-Mar-09 31-Dec-09 Dropped N/A

Subject Specialist-Pamiri Literature12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08 Mir Ali N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08Abdul Habib

SamimN/A

Khair Mohammad Gumshadzi

Subject Specialist-Arabi Literature

CS46.62 Subject Specialist-Nooristani Literature

CS46.63

CS46.56 Subject Specialist-Baloochi Literature

Subject Specialist-Pamiri Literature

Mohammad Asif

Azizullah Shalmach

CS46.65

Subject Specialist-Arabi Literature

Khosh Nazar Pamirzad

CS46.67

CS46.66

CS46.68

448

447

446

449

Subject Specialist-Turkmani LiteratureCS46.53Abdul Majid

Turan

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A

$0.00 $0.00

12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A

$0.00 $0.00

CS46.71 Subject Specialist-English Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A

$0.00 $0.00

CS46.72 Subject Specialist-English Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A

$0.00 $0.00

CS46.73 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Ihsanullah

MadaniN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.74 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08Seddiqullah

ReshtiaN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.75 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 Zaheeruddin N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.76 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 Enayatullah Adil N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 24-Jan-08 25-Dec-08 Aenu Naeem N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09 Aenu Naeem

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$14,400.00 $14,400.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.80 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08 Abdul Jabar N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.81 Subject Specialist-Culture & Arts12 $0.00 $0.00 IC N 16-Apr-08 31-Dec-08Ahmad Naser

SarmastN/A

CS46.82 Subject Specialist-Culture & Arts12 $0.00 $0.00 IC N 22-Apr-08 30-Dec-08Abdul Hameed

AatifN/A

$0.00 $0.00 01-Jan-09 28-Feb-09

CS46.83 Subject Specialist-Computer12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A

CS46.84 Subject Specialist-Computer12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A

12 $0.00 $0.00 IC N 18-Apr-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS46.69 Subject Specialist-English Literature

Subject Specialist-Islamic StudiesCS46.77

Subject Specialist-English Literature

451

453

452

450

CS46.85

Aenu Naeem

Subject Specialist-Sport

CS46.70

CS46.79

CS46.78 Subject Specialist-Islamic Studies

Subject Specialist-Islamic Studies

Khalilullah

Abdul Aziz Behbod

Noor u llah

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

CS46.86 Subject Specialist-Sport 12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A

12 $0.00 $0.00 IC N 26-Feb-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

CS46.88 Subject Specialist-Technical Education12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A

$260,400.00 $260,400.00

CS47.1 Subject Specialist Human Rights12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Abdul Haq N/A

CS47.2 Snr. Subject Specialist Human Rights12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Jafar Mahdawi N/A

CS47.3 Snr. Subject Specialist Gender12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Esmat Ayoubi N/A

CS47.4 Snr. Subject Specialist Gender12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A

CS47.5 Subject Specialist-Distance Education12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A

CS47.6 Snr. Subject Specialist Health Education12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A

CS47.7 Sub-Specialist-Distance Education12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A

CS47.8 Snr. Subject Specialist Mine Awarness12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A

$0.00 $0.00

CS48.1 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Vacant N/A

CS48.2 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Vacant N/A

CS48.3 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 29-Dec-07 28-Dec-08 Vacant N/A

CS48.4 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 29-Dec-07 28-Dec-08 Vacant N/A

$0.00 $0.00

12 $0.00 $0.00 22-Jan-08 31-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $3,600.00 $3,600.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 22-Jan-08 31-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

12 $0.00 $0.00 22-Jan-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 vacant

12 $0.00 $0.00 22-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

12 $0.00 $0.00 22-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 22-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 22-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Mudaser Aslami N/A

N/A

N/A

N/A

N/A

N

Lieaqat Ali

Sayed Mohd Agha Hashimi

Wazir Gul Seddiqi

Graphic Designer/ Data Clerk

IC

IC N

454

Cross Cutting

Sayed Rahmat Shah

CS49.7

CS49.4

456

455

N/A

ICOmaid Mansoor

N

N

N/A

N/A

CS46.87

Subtotal:

Subject Specialist-Technical Education

Graphic Designer/ Data Clerk

Ahmad Fawad

Safatullah

NIC

Graphic Desigen

Subtotal:

CS49.1

Graphic Designer/ Data Clerk

IC

CS49.2

Graphic Designer/ Data Clerk

Graphic Designer/ Data Clerk

CS49.3IC

Graphic Designer/ Data Clerk

CS49.5

CS49.6

Subtotal:

Data Clerks

Abdul Haadi

Mohd Ashraf

Graphic Designer/ Data Clerk

N

IC

N Samen

Wazhma

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

12 $0.00 $0.00 22-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Vacant N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Zabeeh

10 $0.00 $0.00 01-Mar-09 31-Dec-09

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 22-Jan-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 5-Apr-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

Snr.Graphic designer 9 $90,000.00 $0.00 01-Jul-10 30-Apr-11 Vacant

Shifted from EQUIP 1

12 $0.00 $0.00 5-Apr-08 30-Dec-08

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 5-Apr-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 5-Apr-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $9,600.00 $9,600.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 22-Apr-08 30-Dec-08

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 Lal Muhammad N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$4,800.00 $4,800.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 Ataullah Hatami N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 mohd Ahsan

461

Graphic Designer/ Data Clerk460

CS49.15

N

Mohd Ali

Najibullah

Graphic Designer/ Data Clerk

Mir AzamGraphic Designer/ Data ClerkCS49.17

CS49.18

IC

N/A

N/A

Hameedullah

Sultran Mahmood

N/A

Hamatullah

N/A

Suhail

Parwaiz Qarizada

N/A

N/A

Omer Abdullah

Fatima

NargisN

N

CS49.9

CS49.10

CS49.8

CS49.14

CS49.11

CS49.13

CS49.12458

457

CS49.16

459

IC

Graphic Designer/ Data Clerk

N/A

Nader Ali

Graphic Designer/ Data Clerk

Graphic Designer/ Data Clerk

IC N Khatera

Graphic Designer/ Data Clerk

N/AIC N

Hafizullah

IC

N

IC

IC

Graphic Designer/ Data Clerk

N

N

Graphic Designer/ Data Clerk

IC

Graphic Designer/ Data Clerk

Graphic Designer/ Data Clerk

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

Graphic Designer/ Data Clerk12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

$0.00 $0.00 01-Jan-10 31-Mar-10

12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 Vacant N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $3,600.00 $3,600.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

CS49.22 Graphic Designer/ Data Clerk10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Nargis N/A

CS49.23 Graphic Designer/ Data Clerk10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 vacant N/A

10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 IC N 01-Apr-09 03-Jan-10 Vacant N/A

12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11 omar

Shifted from EQUIP 1

10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 vacant N/A

12 $4,800.00 $0.00 1-Apr_10‘ 31-Mar-11 Vacant

Shifted from EQUIP 1

Subtotal: $145,200.00 $50,400.00

12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08 N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

CS50.3 Subject Specialis-Quran Majid12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08Said Mohammad Aqa HashimiN/A

$0.00 $0.00 01-Jan-09 28-Feb-09Said Mohammad Aqa Hashimi

CS50.4 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 Abdul Rafea Alimi N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09 Abdul Rafea Alimi

CS50.5 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 13-Jan-08 30-Dec-08 Abdul Manan N/A

2 $0.00 $0.00 Abdul Manan

CS50.6 Subject Specialis-Aqayed, Adyan12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 Farazulldin N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09 Farazulldin

CS50.7 Subject Specialis-Aqayed, Adyan12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 Mohammad IbrahimN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09 Mohammad Ibrahim

12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08 N/A

$0.00 $0.00 31-Dec-08 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 13-Jan-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

Center for Excellence

Subject Specialis-Quran Majid

Subject Specialis-Arabic Language

Abdul Naser Shafiq

Asadullah

CS50.1 Sayed Fazil ShahSubject Specialis-Quran Majid

CS50.8

CS50.2

Graphic Designer/ Data Clerk

Graphic Designer/ Data Clerk

465 CS49.26

CS49.21

Ahmad Zamir Graphic Designer/ Data Clerk

CS49.20

Rahmatullah

Graphic Designer/ Data Clerk

CS49.19

464

467

CS49.25

466

462

463

waheedullah

CS49.24 Graphic Designer/ Data Clerk sohail

Graphic Designer/ Data Clerk

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A

2 $0.00 $0.00 31-Dec-08 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12

$18,000.00 $18,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $18,000.00 $18,000.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $9,600.00 $9,600.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS50.14 Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 25-Feb-08 30-Dec-08 Hafizullah N/A

2 $0.00 $0.00 25-Dec-08 28-Feb-09 Hafizullah

12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

CS50.16 Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08 Raqibullah N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.17 Subject Specialis-Pedagogy & Psychology12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08 Fazlullah Momand N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.18 Subject Specialis-Pedagogy & Psychology12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08Mohammad Shoaib SaiqalN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.19 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 Abdul Latif Nazari N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.20 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 25-Dec-07 31-Dec-08 Mohammd Ali Fetri N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.21 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 13-May-08 30-Dec-08 Hussain Ali Amini N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.22 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 Vacant N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.23 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08 Zakir Hussain ErshadN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.24 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08Mohammd Ali Qadam Ali ZadaN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.25 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 4-Apr-08 30-Dec-08Mohammd Akram AarefyN/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.26 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 Vacant N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Subject Specialis-Feqa

CS50.10 Subject Specialis-Feqa

CS50.15 Pir Mohd Rohani

Habibullah FouziSubject Specialis-Feqa

CS50.13 Mohd Nasim QazizadaSubject Specialis-Usool Feqa

CS50.12

Subject Specialis-Usool Feqa

Abdul Hakim Mujahid

Subject Specialis-Feqa

Subject Specialis-Sirat Nabi Abdul Sabour

Fazulullah Niazi

CS50.9

CS50.11

468

469

470

471

472

473

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

CS50.27 Subject Specialis-Feqa 12 $0.00 $0.00 IC N 4-Mar-08 30-Dec-08 Abdul Shakor Waqif N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

CS50.28 Subject Specialis-Feqa 12 $0.00 $0.00 IC N 12-Feb-08 30-Dec-08 Hasan Rezaee N/A

$0.00 $0.00 01-Jan-09 28-Feb-09

Subject Specialis-Feqa 12 $0.00 $0.00 IC N 12-Feb-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A

3 $0.00 $0.00 1-Jan-10 31-Mar-10

CS50.31 Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 1-May-08 30-Dec-08 Khadija Muradi N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09 Khadija Muradi

Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08 N/A

2 $0.00 $0.00 01-Jan-09 28-Feb-09

Subject Specialis-Usool Feqa10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A

$105,600.00 $105,600.00

CS51.1 Subject Editor-History 5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A

$0.00 $0.00

CS52.1 Subject Editor-Uzbaki Language5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A

CS52.2 Subject Editor-Turkmani Language5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A

CS52.3 Subject Editor-Dari Language5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A

Subtotal: $0.00 $0.00

CS 53.1 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped

CS 53.2 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped

CS 53.3 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped

CS 53.4 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped

CS 53.5 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped

CS 53.6 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped

10 $0.00 $0.00 01-Apr-09 31-Jan-10vicant,amount

reduced

3 $0.00 $0.00 01-Jan-10 31-Mar-11

12

$9,000.00 $9,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 01-Apr-09 31-Jan-10vicant,amount

reduced

3 $0.00 $0.00 01-Jan-10 31-Mar-11

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10vicant,amount

reduced

3 $0.00 $0.00 01-Jan-10 31-Mar-10 Qalamuddin

10 $0.00 $0.00 IC N 01-Apr-09 31-Jul-09vicant,amount

reduced

3 $0.00 $0.00 01-Jan-10 31-Mar-11

12

$12,000.00 $12,000.00

1-Apr_10‘ 31-Mar-11

Shifted from EQUIP 1

10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10vicant,amount

reduced

$0.00 $0.00 01-Jan-10 31-Mar-10Omar Gul Madani

10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10vicant,amount

reduced

3 $0.00 $0.00 01-Jan-10 31-Mar-10

12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11

$45,000.00 $45,000.00

CS 53.7 Research specialist Curriculum

Subtotal:

Shifted from EQUIP 1

Subtotal:

ResearchCenter

Subtotal:

Senior Editor

Faiz Mohammad

IC N

IC N

Research specialist Curriculum CS 53.12

Haroon

CS 53.11 Research specialist Curriculum

CS50.29 Mohammd Hussain Farhang

Subject Specialis-Feqa

CS 53.9 Research specialist Curriculum

CS 53.10

CS 53.8 Research specialist Curriculum

Research specialist Curriculum Haroon

Rasol Zahir

New Curriculum Lump Sum Contracts

General Education

Mohammd Ibrahim ShahabCS50.32

476

475

474

Planed Actual Contract Signing/ Actual Date of Contract Signing

Date of Completion

Remarks

Progress of Procurement as

of

Name of Consultant

SL No.

Planned/Actual Date

ID PKG. No. (New)

Budget Procedure/ Method

IDA Prior Review (Y/N)

Name of Contract (Brief Description)Duration (Months)

CS 54.1 Development and Compilation of approx.32 Primary and High School third language booksLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines.

done

CS 54.2 Development and Compilation of approx.21 Secondary School third language booksLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

CS 54.3 Development and Compilation of approx 28 Dari ,Pashto and Jafari Text books and teachers GuidesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

CS 54.4 Development and Compilation of approx 31 Islamic Education Text books and teachers GuidesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

CS 54.5 Development and Compilation of approx 27 Science , Mathematics and Social Studies Text books and teachers GuidesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

CS 54.6 Translation of approx.44 Teacher guide booksLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

CS 54.7 Translation of approx.63 Text Books of all classesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

$0.00 $0.00

Grand Total: (TED+ EQUIP+Curriculum)$6,913,210.00 $5,727,569.00

Legends :

rose color

light yellow

Lime (green)

Subtotal:

already existing in equip II

already existing in equip II

Newly proposed and approved by WB

District Village Bid opening date

Date of Delivery/

Completion

1 2 3 4 6 7 8 9 10 11 12 13 15

2 TTC20.1 KapisaTTC-Learning Space

Mahmoud Raqi Center 10 140,000.00$ 140,000.00$ 8,091,074Af RCC NCB N MoE 08-Jul-08 Mar-09M/s Bahar Kapisa

3 TTC3.1 BamyanTTC-Learning Space

Bamyan City Center 10 140,000.00$ 140,000.00$ 9,304,585Af RCC NCB N MoE 08-Jul-08 Mar-09M/s Abdul Nazeef MASOOD

4 TTC5.1 Dai-KundiTTC-Learning Space

Nilli Center 10 140,000.00$ 140,000.00$ 7,510,021Af RCC NCB N MoE 25-Jun-08 Mar-09M/s Pesh Kadam CC

5 TTC7.1 GhorTTC-Learning Space

Chekhcharan Center 10 140,000.00$ 160,000.00$ -Af RCC NCB N MoE 25-Dec-09 Oct-09

1,660,000.00$ 1,680,000.00$ 24,905,680Af

5

Grand Total 1,680,000.00$

Total

Trinkot

Estimation Cost No of Rooms to

be Built

UrozganTTC-Compass- Urozgan

Location

Name of School Province Revised Estimation

Cost in USD

RCC

SL No.

1 TTC24.1 1,100,000.00$ Complete Campus

1,100,000.00$ Center

Contract Package Number*

145

Yes MoE Aug-08 Feb-09

RemarksActual Cost in AfghaniIDA Prior

Review (Y/N)Responsible

Agency

Planned/Actual Date

Type of Contract

Type of Construction

NCB-Af

1 2 3 4 5 6 7 8 9 10-Jan-00 11 12

Desk top Computer + UPS(IncludesTED)

70 $80,500.00 No No

Printers 50 $25,000.00 No No

Flash Desk 1 GB 130 $4,550.00 No No

G 1.3 Photocopier Machine (Includes TED) 35 $122,500.00 $122,500.00 NCB No No No 15th September 2008Procurement to be clubbed with 3.2&4.2

Procurement done through ICB G-052

$232,550.00

Laptop 6 $7,000.00 No No

Server Dual processor 1 $20,000.00 No No

4 KVA UPS with 7 KVA 1 $8,000.00 No No

Laser Printer A4 (Black and White, Double side, sorting and stapler)

1 $10,000.00 No No

Laser Printer A3 (Color) 1 $15,000.00 No No

HP Plotter A 1 1 $20,000.00 No No

HP Plotter A 0 1 $20,000.00 No No

$100,000.00

Laptop(Includes TED) 15 $17,500.00 No No

Laser Printer Color A3 1 $15,000.00 No No

IT Equipment Lot $10,000.00 No No

Laser Printer 2015n 15 $8,250.00 No No

G 3.2 Photocopy machine 2 $14,000.00 $14,000.00 NCB No No NoBids not yet called for want of funds

Procurement to be clubbed with 1.3&4.2

Procurement done through ICB G-052

$64,750.00Sub Total

ICB

ICB

ICB

Procurement done through ICB G-38

Procurement done through ICB G-38

YES

EMIS Requirements

Sub Total

$100,000.00

$50,750.00Bids are due for opening on 29 March 2009

YES

Estimated Cost (Total lot cost) in US$

Quantity

G 3.1

Sub Total

G 2.1

EQUIP + GMU Requirments

Procurement to be clubbed with G-1.2,G-3.1,G-4.1 and G-4.3

Procurement to be clubbed withG- 1.2G-2.1,G-4.1 and G-4.3

Ref. No. Estimated package cost in

US$

Review by Bank (Prior /

Post)

G 1.2 YES

School Kabul Province

$110,050.00Procurement done through ICB G-38

Bids are due for opening on 29 March 2009

Procurement MethodDomestic Preference (yes/no)

Bids are due for opening on 29 March 2009

Contract (Description) Remarks

Procurement to be clubbed with G-2.1,G-3.1,G-4.1 and G-4.3

Prequalification (yes/no)

Expected Bid-Opening Date Comments

Estimated Cost (Total lot cost) in US$

Quantity Ref. No. Estimated package cost in

US$

Review by Bank (Prior /

Post)Procurement Method

Domestic Preference (yes/no)

Contract (Description) RemarksPrequalification (yes/no)

Expected Bid-Opening Date Comments

G 4.2 Heavy Duty Photocopy machine 1 $10,000.00 $10,000.00 NCB No No NoBids not yet called for want of funds

Procurement to be clubbed with G-3.2&G-1.3

Procurement done through ICB G-052

G 4.3Laser Printer A4 (Black and White, Double side, sorting and stapler)

1 $10,000.00 $10,000.00 ICB No No YESBids are due for opening on 29 March 2009

Procurement to be clubbed withG- 1.2,G-2.1,G-3.1 and G-4.1

Procurement done through ICB G-38

hp 9250c digital sender 2 $14,000.00 $14,000.00

Westren Digital - Hard Drive 4 $1,500.00 $1,500.00

Server Computer 1 $8,000.00 $8,000.00

$35,000.00

Laptop Computer 55 $0.00

Desktop Computer+UPS 30 $0.00

Server Computer (Power Edge 840) 1 $0.00

Stablizer 20 $0.00

Printer 20 $0.00

Scanner 10 $0.00

Flash memory 1 GB 50 $0.00

$0.00

Canon EOS 50D SLR Digital Camera 1 $1,000.00

Digital Camera (one per province) 35 $0.00

$1,000.00

G 5.3 Laptop bag.case 50 $0.00 $0.00 NS No No No 01-Jul-09 Procurement Done

$0.00

Office Desk+Weeling Chair 60 $15,000.00

Meeting table+Chairs Big size 3 $3,000.00

Filling cabinet 90 $7,860.00

$25,860.00

G 5.4 M

Sub Total

Sub Total

NCB

G 4.1 1Bids are due for opening on 29 March 2009

G 4.4

No NoLaser Printer Color A3

$1,000.00 No No

N

G 5.2 NS

NS NNo

09-Jun-10$0.00 No

NEW REQUIREMENTS-MOE-PROCUREMENT DEPARTMENT

G 5.1No

$15,000.00 ICB YES

No

Sub Total

$15,000.00

Sub Total

Procurement done through ICB G-38

Procurement to be clubbed with G-1.2,G-2.1,G-3.1 and G-4.3

New Item Added

No 01-Jul-09

Sub Total

NCB No No No

Estimated Cost (Total lot cost) in US$

Quantity Ref. No. Estimated package cost in

US$

Review by Bank (Prior /

Post)Procurement Method

Domestic Preference (yes/no)

Contract (Description) RemarksPrequalification (yes/no)

Expected Bid-Opening Date Comments

Air Conditionar 5 $0.00

Gas Heater 15 $0.00

Thermoses 3 lit 50 $1,500.00 N

$1,500.00

G 5.6 Certificate Printing 400000 $0.00 $0.00 NS No No No 01-Aug-09

G 5.7TextBooks Printing in two Languages for Teacher Training Program

35 Dozen $0.00 $0.00 ICB No Yes YES 01-Jun-09

G 6.1 Network Infrastructure Package $0.00 $0.00 ICB No Yes Yes 01-Jul-09

$0.00 $0.00

Laptop computers 10 $15,000.00 $0.00

Printing Materials 1 $3,600.00 $0.00

Furniture 1 $15,000.00 $0.00

Projector 1 $0.00 $0.00

Scanner Heavey duty 1 $0.00 $0.00

Server 3 $0.00 $0.00

$33,600.00 $0.00

Furniture for TTC 1 $679,028.93 $679,028.93

Linbraries for TTC 1 $1,093,690.85 $1,093,690.85

Science laboratories for TTC 10 $800,084.00 $800,084.00

Computer labs for TTC 10 $1,277,850.00 $1,277,850.00

$3,850,653.78 $3,850,653.78

Anti Virus $0.00 $0.00

Websence $0.00 $0.00

Softwares $0.00 $0.00

G 6.5 Printing of Curriculum $2,900,000.00 $0.00 ICB No No Yes 10-Oct-10 New Items Added

$2,900,000.00 $0.00

Digital Cameras 2 $1,000.00 $7,000.00 NS N Yes Yes 01-Jul-09

Videp Cameras 1 $1,000.00 $1,000.00 NS N Yes Yes

Projector 1 $5,000.00 $5,000.00 NS N Yes Yes

Projector 2 $10,000.00 $0.00 N Yes Yes 15-Aug-10

Laptop Computers 9 $13,500.00 $0.00 N Yes Yes 15-Aug-10

HP Lserjet Printer 2 $11,000.00 $0.00 N Yes Yes 15-Aug-10

Photocopier Machiene 1 $5,000.00 $0.00 N Yes Yes 15-Aug-10

Scanner 1 $200.00 $0.00 N Yes Yes 15-Aug-10

UPS 4 $800.00 $0.00 N Yes Yes 15-Aug-10

Digital Cameras 5 $2,000.00 $0.00 N Yes Yes 15-Aug-10

Super Custom Mini Van 4 $80,000.00 $0.00 NCB N Yes Yes 15-Aug-10

Air Conditioning 3 $1,500.00 $0.00 NS N Yes Yes 15-Aug-10

$131,000.00

G8.1 Laptop Computer 103 $103,000.00 $103,000.00 ICB N Yes Yes 01-Jun-09To be clubbed with G 5.1 and Procured

$103,000.00 $103,000.00Sub Total

No No

G 7.2

Procurement Done

NCB

New Items Added

Sub Total

10-Jul-10

No

No 10-Jul-10

Sub Total

New Items Added

CURRICULUM

NEW EQUIP REQUIREMENTS

G 6.2

NCB No

NCBG 6.4

G 7.1

No

NS 01-Jun-09

Sub Total

Sub Total

Sub Total

Sub Total

No

No No

NCB

NEW EMIS REQUIREMENTS

New Items Added

G5.5 $1,500.00

10-Jul-10

Sub Total

New Items Added

TED Requirements

G 6.3

No No

No

Estimated Cost (Total lot cost) in US$

Quantity Ref. No. Estimated package cost in

US$

Review by Bank (Prior /

Post)Procurement Method

Domestic Preference (yes/no)

Contract (Description) RemarksPrequalification (yes/no)

Expected Bid-Opening Date Comments

22 $7,478,913.78TOTAL GOODS

Expected proposals

submission date

Date of Completion

1 2 3 4 5 5 6 7 8 9 10 11 12

1 CA 1.1 Scholarship for girls 48 $ 10,000,000.00 $ 2,000,000.00 SSS Y

Proposal due for opening on 13th May 08

Dec-12 GTZ Contract Signed

2 CA 1.2District Teacher Tranining Teams-Pacakage 1

30 $ 9,500,000.00 FBS Y

Proposals Opened on 17 th march2008

Jun-11Just for Afghan Capacity and Knowledge (JACK), in joint venture with Save the Children

Contract Signed

3 CA 1.3District Teacher Tranining Teams-Pacakage 2

30 $ 10,987,000.00 FBS Y

Proposals Opened on 17 th march2008

Jun-11 ADA & Partners Contract Signed

4 CA 1.4District Teacher Tranining Teams-Pacakage 3

30 $ 2,631,000.00 FBS YProposals Opened on 28th April 08

Jun-11 Save the Children & others Contract Signed

5 CA 1.5 Principals Training 30 $ 1,500,000.00 $ - FBS Y Dropped

6 CA1.6Third Party Evaluator for District Teacher Training

30 $ 500,000.00 $ 22,569,000.00 QCBS Y 15th Nov 10procurement process to begin

500,000.00$

35,118,000.00$ 22,569,000.00$

9 CA1.7External Evaluation of IMPACT

1,000,000.00$ -$ QCBS Y 15th Nov 10procurement process to begin

$ 200,000.00 Dropped

10 CA1.8 EMIS Development 500,000.00$ -$ QCBS Y 15th Nov 10procurement process to begin

300,000.00$ Dropped

11 CA1.9 TTC Teachers tranings 12 $ 4,870,000.00 $ 1,020,000.00 QCBS Y 20-Mar-11New Trainning Purposed

12 CA1.10Monitoring and Management team consultancy

12 $ 740,000.00 $ 740,000.00 QCBS Y 20-Mar-11New Trainning Purposed

8 GRAND TOTAL: 36,618,000.00$ 22,569,000.00$

Total:

Planned/Actual Date

Name of Consultant Progress of

Procurement as of

Remarks

Merged with DT3 Packages

SL No.ID/ PKG

No.Procedure/

Method

$ 20,569,000.00

IDA Prior Review (Y/N)

Name of Contract (Brief Description)

Duration ( Months)

Estimated Cost Actual Contract Price