General
Project information: Education Quality Improvement Project II (EQUIP II)
Project Implementing Agency: Ministry of Education of the Islamic Republic of Afghanistan
Country: Borrower:Project Name:
Revised Procurement Plan EQUIP II (Revision Ref.: 04 on 15-05-10)
Procurement Management Unit
Education Quality Imrpovement Program-II
FY2008-10-11
PROCUREMENT PLAN
MINISTRY OF EDUCATION
EDUCATION QUALITY IMPROVEMENT PROGRAM-IIAFGHANISTAN
Grant No.:Project ID : P106259
AfghanistanIslamic Republic of AfghanistanEducation Quality Improvement Project II (EQUIP II)H 354 –AFP106259
Bank’s approval date of the procurement Plan : 17 Nov.2007 (Original:)
Period covered by this procurement plan: One year
Procurement for the proposed project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Legal Agreement. The procurement will be done through competitive bidding using the Bank’s Standard Bidding Documents (SBD). . The general description of various items under different expenditure category are described. For each contract to be financed by the Loan/Credit, the different procurement methods or consultant selection methods, estimated costs, prior review requirements, and time frame are agreed between the Recipient and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity.
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
12
3456
1
2
3
4
5
6
123
Comments1234
Procurement MethodCivil Works
Comment
II. Goods and Works and consulting services.
Prior Review Threshold US$ 500,000 or more per contract US$ 200,000 or more per contractAllDirect Contracting
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement
US$ 5,000,000Threshold for Methods
Goods
Regardless of value
Single Source Selection
US$ 100,000 or more per contractUS$ 50,000 or more per contractAll firms and Individuals
Consulting Services (firms)Consulting Services (Individual)
NCB Goods
ICB Goods
US$ 100,000
US$ 200,000
US$ 200,000
1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:
Comments
US$ 100,000
III. Selection of Consultants
Selection Method Prior Review Threshold $
Equivalent or moreNCB Civil Works US$ 5,000,000 Equivalent or less
Equivalent or lessEquivalent or more
Procurement MethodICB Civil Works
Equivalent or lessCommunity Contracts
Shopping Goods Equivalent or less
Regardless of value
4All
200,000 equivalent or above
Comment
Single Source (Firms & Individuals)
200,000 equivalent or above
Regardless of value
Selection Method
QBS/FBS/LCSQCBS
Threshold for Methods
Competitive Individual Competitive Methods (Firms)
50,000100,000
1. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
200,000 equivalent or less200,000 equivalent or lessCQS/QBS/FBS/LCS
QBS/QCBS
S. No. Procurement TypeNumber of Projects/ Package
Total Amount in USD
S. No.Procurement Type
Number of Projects/ Package
Total Amount in USD
1 2 3 4 5 6 7 8
1 NCB 96 $ 18,476,300.00 1 NCB 177 $ 26,380,347.40
2 PED $ - 2 PED 8 $ 1,160,006.00
3 CC 621 $ 32,610,000.00 3 CC 857 $ 43,818,408.00
4 Trainings $ - 4 Trainings 12 $ 2,812,645.00
5 TTC 4 $ 1,660,000.00 5 TTC 5 $ 1,680,000.00
6 Goods 18 $ 4,165,000.00 6 Goods 22 $ 7,478,913.78
7 IC N/A $ 3,651,720.00 7 IC N/A $ 6,913,210.00
8 C. Firms 8 $ 56,926,443.00 8 C. Firms 8 $ 22,569,000.00
9 Operation Cost $ - 9 Operation Cost EQUIP+TED $ 2,627,587.90
10Quality Enhancement Grants for 2536 schools in 29 provinces
$ - $ 5,727,580.00
117,489,467.00$ Sub Total 121,167,698.08$
Procurement Plan EQUIP II Ref. 03 on 14-03-09 R. Procurement Plan EQUIP II Ref. 04 on 15-05-10
Sub Total
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 NCB 1.1 Darululum School 140,000.00$ 140,000.00$ 6037471 N N MOE 10 NCBIbeem roofing
Jul-08 Jan-09 M/s Khalid Basheer CC
2 NCB 1.2 Qarqach Kandalan Boys School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-010 Jul-011 New Project Purposed
3 NCB 1.3 Sina Urdo boys School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-010 Jul-011 New Project Purposed
4 NCB 1.4 Kunbad Kalora School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-010 Jul-011 New Project Purposed
Sub Total 524,000.00$ -$
1 NCB2.1 Turabi Girls School 112,000.00$ 5802894 N N MOE 8 NCB RCC Aug-08 Oct-09 M/s Siar Qurban CC2 NCB2.2 Abul- muyid Balkhi -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB Ibeem roofing with GI SheetJul-08 Jan-09 Bids due for opening in August 20083 NCB2.3 Abu-Rayan Alberuni 224,000.00$ 8807338 N N MOE 16 NCB Ibeem roofing with GI SheetAug-08 Oct-09 M/s Habib Aryan CC4 Farida Balkhi High School 140,000.00$ 105 Deeragai 112,000.00$ 86 Bangala 112,000.00$ 87 Tatai 112,000.00$ 88 Salarzai 112,000.00$ 8- Abul-Hameed -$ Dropped as it is not a formal School
9 Sultan Ibrahim Adham Girls School -$ 128,000.00$ 8 Jul-010 Jul-011Replacement of above school/ Projct Name has been revised from Charbagh Girls School to Sultan Ibrahim Adham Girls School
10 Charbulak High school 112,000.00$ 8345733 8 Jul-08 Oct-09 M/s Abdullah Qurban CCSub Total 1,036,000.00$ 384,000.00$
1 NCB5.1 Tarbiyae Maleem School 140,000.00$ 140,000.00$ 8282282 N N MOE 10 NCB Ibeem roofing with GI sheetAug-08 Feb-09 M/s Baheshti CC2 NCB5.2 Darululum School 140,000.00$ 140,000.00$ 8172656 N N MOE 10 NCB Ibeem roofing with GI SheetAug-08 Feb-09 M/s Baheshti CC
Sub Total 280,000.00$ -$
1 Sultan Mahmmod Rawza High School -$ 160,000.00$ 10 NCB RCCBids due for opening in August 2008 Project name has been revised from Alberuni Qarabaghi boys to Sultan Mahmood Rawza High Schoo
- Imam Hadad -$ 8 NCB RCC dropped due to land problem
2 Jihan Numai Garmab School -$ 128,000.00$ NCB RCCRepalcement of above school/ Project name has been revised from Nazar Khan Baba school to Jihan Numai Garghi High School
3 Shahre kuhna Boys 140,000.00$ 7932723 10 NCB RCC M/s Arun Zaki CCSub Total 140,000.00$ 288,000.00$
Bids opened on 27 Decembert 2008 and contract under issue
Jan-09
RCC
NN MOE
NCBN
N MOEN NCB
NCB2.4 Y
List of Schools of Badghis Province
List of Schools of Balkh Province
List of schools of Daikundi Province
List of Schools of Ghazni Province
MOE RCC Jul-08
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
588,000.00$
Mar-09
NCB2.5 224,000.00$
NCB6.1 288,000.00$ Aug-09
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
1 NCB7.1 Shiekh Mohammad Saghari High School -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC2 NCB7.2 Taqa Tamor High School 128,000.00$ -$ 128,000.00$ N N MOE 16 NCB Ibeem Roofing with GI sheet3 NCB7.3 NaswaneSultan Razia -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC4 NCB7.4 Darululum School -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC5 NCB7.5 Dawlatyar Girls Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed6 NCB7.6 Deh Haji High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed
Sub Total 384,000.00$ 672,000.00$
1 NCB8.1 Fushaj High School $ 160,000.00 $ 160,000.00 10088324 N N MOE 20 NCB Ibeem roofing with GI sheetJul-08 Oct-09 M/s Refa Sadat CC2 NCB8.2 Qalae Jawhar $ 128,000.00 $ 128,000.00 11002893 N N MOE 16 NCB Ibeem roofing with GI sheetJul-08 Oct-09 M/s Sahail Mumtaj CC3 NCB8.3 Lycee Inqelab $ 280,000.00 $ 280,000.00 10920264 N N MOE 20 NCB RCC Jul-08 Oct-09 M/s Adnan CC4 NCB8.4 Shara Parda $ 128,000.00 $ 128,000.00 8732681 N N MOE 16 NCB Ibeem roofing with GI sheetJul-08 Oct-09 M/S Nav Bast CCn 5 NCB8.5 Said Mohammad Qanat $ 224,000.00 $ 224,000.00 8460513 N N MOE 16 NCB RCC Jul-08 Oct-09 M/s Adnan CC6 NCB8.6 Jebrail Middle School $ 224,000.00 $ 224,000.00 8617536 N N MOE 16 NCB RCC Aug-08 Oct-09 M/s Adnan CC7 NCB8.7 Fakhri Saljoqi $ 128,000.00 $ 128,000.00 N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed8 NCB8.8 Ghoran Midle School $ 128,000.00 $ 128,000.00 N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed9 NCB8.9 Ghaibatan High School $ 128,000.00 $ 128,000.00 N N MOE 8 NCB RCC Jun-10 Jun-11 New Project Purposed
Sub Total 1,528,000.00$ -$
1 NCB9.1 Surkh Abad High School -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC Sep-08 Mar-09Project name has been revised from Pada Khwab Roghani High School to Surk Abad Boys High School
2 NCB9.2 Naser Kamal Khail Girls School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Aug-10 Aug-11 New Project PurposedSub Total 128,000.00$ 256,000.00$
1 NCB10.1 Darululum School 140,000.00$ 140,000.00$ 6034868 N N MOE 10 NCB Ibeem roofing with GI sheetSep-08 Mar-09 M/S Noor Aftab CC2 NCB10.2 Unkhi High School 480,000.00$ 480,000.00$ N N MOE 30 NCB RCC Jul-10 Jul-11 New Project Purposed3 NCB10.3 Milad u Nabi Midle School 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC Jul-10 Jul-11 New Project Purposed4 NCB10.4 Abkazar Girls High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed5 NCB10.5 Hazrat Bilal School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed
Sub Total 1,132,000.00$ -$
List of Schools of Ghor Provice
Aug-09 Mar-09
List of Schools of Maidan Wardak Province
List of Schools of Logar Province
List of schools of Paktia Province
List of Schools of Hirat Province
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
1 NCB12.1 Aryoob Jaji High School $ 128,000.00 $ 128,000.00 10715024 N N MOE 16 NCB Ibeem roofing with GI sheetJul-08 Mar-09 M/S Sadad Mohammad cc- NCB12.2 Daulat Zai School -$ -$ N N MOE 8 NCB RCC Sep-08 Mar-09 Dropped due to land problem
Sub Total 128,000.00$ -$
1 NCB13.1 Khinj High School 112,000.00$ 112,000.00$ 6424005 N N MOE 14 NCB Ibeem roofing withGI SheetJul-08 Mar-09M/s Basharat Noori CC
Sub Total 112,000.00$ -$
- NCB14.1 Zulfiqar boys School -$ -$ N N MOE 8 Dropped as it si built bt PRT- NCB14.2 Darae Sayedan High School -$ -$ N N MOE 8 Dropped as it si built bt PRT- NCB14.3 Darululum School -$ -$ N N MOE 10 Dropped as it si built bt PRT- NCB14.4 Hale Hunud School -$ -$ N N MOE 8 Dropped as it si built bt PRT
Sub Total -$ -$
1 NCB26.1 Darululum School 140,000.00$ 140,000.00$ AFA 6,660,711.00 N N MOE 10 NCB Ibeem roofing with GI SheetSep-08 Dec-09 Kabul itefaq CC
2WU-153 Yoltarab School -$ -$
N N MOE NCB Ibeem roofing with GI SheetJul-10 Jul-11Shifted from EQUIP I/ Planed for 1389/ Project Procurement Method has been changed to CC
Sub Total 140,000.00$ 0
1 NCB27.1 Technical School 140,000.00$ 140,000.00$ 6739198 N N MOE 10 NCB Ibeem roofing with GI SheetJul-08 Apr-09 M/S Chungar CCSub Total 140,000.00$ -$
1 NCB16.1 Abul Hasan Khirqani High School 112,000.00$ 112,000.00$ 6613379 N N MOE 8 NCB RCC Oct-08 Apr-09 M/s Shahi Kot CC2 NCB16.2 Nisar ahmad shaheed $ 224,000.00 11172380 16 Oct-08 Apr-09 Ms/ Sebaqat Wafayee CC
3 NCB16.3 Ashrafia Tarashud Midle School -$ 128,000.00$ 8 Aug-10 Aug-11Projec Name has been revised from Nawabade katayan to Ashrafia Tarashud Midle School
- NCB16.4 Darululum School -$ -$ N N MOE 10 NCB RCC Oct-08 Apr-09 Dropped as Built by other AgencySub Total 336,000.00$ 128,000.00$
List of Schools of Kabul City
List of Schools of Parwan province
List of schools of Sar-e-Pol Province
RCCMOE
List of Schools of Takhar Province
N $ 352,000.00 N NCB
List of schools of Panjsher Province
List of Schools of Samangan Province
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
1 Darul Maleemin School 140,000.00$ 9991879 10 Aug-08 Dec-09 M/sAfghan Tamir CC2 Mahjoba Herawi Girls School 420,000.00$ 24365130 30 M/s Mansoor Ayub CC3 Baihaqi Boys school -$ 384,000.00$ 244 Zabihulla Shahid Secondry school -$ 128,000.00$ 8- Ibne Sina High school/Mohammad Seddiq FARHANG -$ -$ 30 Dropped due to land 5 Alam Faizad High school -$ 128,000.00$ 86 Ustad Misba Secondry school 420,000.00$ 22263211 30 Jul-08 Feb-09 M/s Noor Aftab CC7 Abizar Ghafari High school 224,000.00$ 9991879 16 M/s Afghan Tamir8 Sayed Ismael Balkhi High school 280,000.00$ 12056296 20 M/s Mushfaq Qadri CC9 Qala Bahador Khan Secondry school 420,000.00$ 18043389 30 M/s Zia Noori CC10 Shahrak Omid Sabz boys Primary school -$ 256,000.00$ 1611 Shahrak Omid Sabz Girls Primary school -$ 256,000.00$ 16- Aqa Ali Shams Boys secondry school -$ -$ 24 Dropped due to land
12 200 Family Rahman mina High school 420,000.00$ 121823267 30 Ms Noor Constructionj Company
13Saye Noor Mohammad Shah Mina boys secondry school
420,000.00$ 21832267 30 M/s Qanat Akbar shah CC
14 Hesa Awal Shah Shahid school -$ 320,000.00$ 20- Shah Shahid Khas Secondry school -$ -$ 30 Dropped due to land
15 Ali Ahmad Popal High school -$ 480,000.00$ 3016 Bibi Mahro boys High scool -$ 480,000.00$ 30- Qabil Bay Secondry school -$ -$ 16 Dropped due to land
17 Khowaja Rawash Secondry school -$ 128,000.00$ 8- Aziza Afghan Secondry school -$ -$ 16 Dropped due to land
18 Sadudin Ansary Secondry school -$ 128,000.00$ 8- NCB15.10 Chamandi Char Qala Wazir Aabad -$ -$ -$ Dropped due to land
19 Elhaqia Saidal Nasiry -$ 256,000.00$ 1620 Khair Khana # 16 secondry school -$ 128,000.00$ 821 Chashma Kotal secondry school (Azadi) -$ 128,000.00$ 8- Naw Abad Pul-i-Charkhi high school -$ -$ 8 Dropped due to land- Arzan Qemat Girls secondry school -$ -$ 8 Dropped due to land- Block 12 Primary school -$ -$ -$ Dropped due to land
22 Block 11/9 primary school 434,000.00$ 420,000.00$ 19,008,837.00 31 NCB RCC Aug-09 Mar-10 M/s Maushfaq Qadri CC- Dowazda Imam Mixed primary school -$ -$ 16 Dropped due to land
23 Bibi Zainab Kobra secondry school -$ 128,000.00$ 824 Hamayun Shahid high schoool -$ 128,000.00$ 8- Abdul Ghafor Ahmadi -$ -$ 16 Dropped due to land- Shahrak Khorasan High school -$ -$ 30 Dropped due to land
24 Hale Hunud School -$ -$ 8 Dropped due to land- NCB 15.15Disabled and Blind school -$ -$ MOE Aug-09 Mar-10 Dropped due to land
25 NCB 15.16Administrative Building for Infrastructure Department
80,000.00$ -$ 80,000.00$ NCB RCC Aug-10 Aug-11 New Project Purposed
Sub Total 3,258,000.00$ 3,456,000.00$
Mar-10
Mar-10
N
Aug-09
N
Mar-10
Mar-10
NCBAug-09
Aug-09N
Aug-09MOE
Aug-09
RCC
Mar-10
Mar-10
NCB15.14
NCB15.13Aug-09
Mar-10N
-$ N NCB RCC
N
Aug-09
NCBAug-09
RCC
Mar-10
Y
N
N MOE
MOE
N Y MOE
NCB
NCB15.12
256,000.00$
NCB15.8
NCB15.9
NCB15.11
256,000.00$
960,000.00$
512,000.00$
Y
Y
N
NCB15.3
700,000.00$
644,000.00$
YNCB15.4
640,000.00$ YNCB15.2
MOE
MOE
MOE NCB
NCB15.7
512,000.00$
320,000.00$
NCB15.5
NCB15.6 840,000.00$
NCB
NCB
MOE
Y
N
N Mar-10
Mar-10
Aug-09
RCC Aug-09
RCC
NCB
MOE
MOE
Feb-09
MOE
Aug-08
MOE RCC
NCB
NCB
Mar-09
Aug-08
NCB15.1 560,000.00$
Aug-09N
NCBY
N
RCC
N
NCB
Aug-09
Mar-10
RCC
RCC
Feb-09
RCC
RCC
RCC
N
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
1 NCB17.1 Amir Habibullah 160,000.00$ 160,000.00$ 8958885 N N MOE 16 NCB Ibeem roofing with GI SheetOct-08 Apr-09 M/s Bright International CC2 NCB17.2 Sahak girls School 160,000.00$ 160,000.00$ 8958885 N N MOE 16 NCB Ibeem roofing with GI SheetOct-08 Apr-09 M/s Bright International CC3 NCB17.3 Farza Girls school -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC4 WU -154 Deh Araban Qargha 104,000.00$ 104,000.00$ N N MOE NCB Ibeem roofing with GI Sheet Shifted from EQUIP I/ Planed for 1389
5 WNC22Naswan Mirhamidullah, Girls, Mir Bacha Koat
55,000.00$ 55,000.00$ 61,893.20$ 3,094,660
NN
MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Baryalai and Haqeeq Construction Company
6 WNC28Construction of 1)Naswan Dehdana, Girls, Dehdana Hawza 7,
108,275.00$ 108,275.00$ 97,850.66$ 4,892,533
NN
MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10 Jamal Zai Construction Company
7 WNC 29Mirman Khajo, Girls, Guzar Achikzayee Hawza 1
108,275.00$ 98,461.80$ 4,923,090
NN
MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Engineering Techniques Construction Company
8 WNC32Khawaja Rawash, Boys & girls, Khwaja Rawash Hawza 9
99,972.40$ 99,972.40$ 99,743.86$ 4,987,193
NN
MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10JANS Construction Company
9 WNC 27 Naid Shahaed 108,275.00$ 108,275.00$ 102,087.30$ 5,104,365
NN
MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Instead of Khawaja Boghra, Boys, Khwaja Boghra Hawza 15
10 WU51 Charbran SchoolGumal district 108,275.00$ 108,275.00$ 107,278.54$ 5,363,927.00 N N MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10 Saem Construction Company
11 WU58 Taqumuddin Mixed H. School, Seogard
108,275.00$ 108,275.00$ 108,275.00
NN
MOE NCB Ibeem roofing with GI SheetAug-09 Mar-10Contracted through BRAC
Sub Total 1,120,347.40$ 256,000.00$
1 Yangi arigh $ 196,000.00 $ 420,000.00 8912245 14 Oct-08 Apr-09 M/s Bibi Hawa CC2 Mirwais minah $ 224,000.00 12096340 16 M/s Faiz Nawayee3 NCB19.2 Khuwajah do koh $ 128,000.00 $ 128,000.00 11603378 N N MOE 16 NCB Ibeem roofing with IG SheetOct-08 Apr-09 M/s Abdullah Qurban CC4 NCB19.3 Darululum School $ 140,000.00 $ 140,000.00 11052023 N N MOE 10 NCB RCC Oct-08 Apr-09 Ms Murad Fiaz
Sub Total 688,000.00$ -$
1 NCB20.1 Madrasae Abdul Wahab -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC Aug-09 Mar-102 NCB20.2 Ashorkhil Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed3 NCB20.3 Abdul Mobin Shaheed Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed4 NCB20.4 Qari Mir Usman Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed
Sub Total 384,000.00$ 160,000.00$
1 NCB28.1 Darulum school -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC2 NCB28.2 Doshi Girls High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed3 NCB28.3 Wahdat Mili Wardak Ha Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed4 NCB28.4 Dehzak School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed5 NCB28.5 Chinzai Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed
Sub Total 512,000.00$ 160,000.00$
1 NCB29.1 Darulum school 140,000.00$ 140,000.00$ N N MOE 10 NCB RCC Opened on 15 th November 20082 NCB29.2 Jangle Bashi 140,000.00$ 140,000.00$ N N MOE 10 NCB RCC Opened on 15th november 20083 WU-120 Gunbad School -$ 224,000.00$ N N MOE NCB RCC Aug-10 Aug-114 WU-124 Gul baldaq Takhta 112,000.00$ 112,000.00$ N N MOE NCB RCC Aug-10 Aug-115 WU-125 Dawlat Yar School 112,000.00$ 112,000.00$ N N MOE NCB RCC Aug-10 Aug-116 WU-126 Sawika School -$ 128,000.00$ 128,000.00$ N N MOE NCB RCC Aug-10 Aug-117 WU-127 Taloka 104,000.00$ N N MOE NCB RCC Aug-10 Aug-118 WU-148 Karutai School -$ 52,000.00$ N N MOE NCB RCC Aug-10 Aug-119 WU 119 Shinwari Gul tepa School 130,000.00$ 130,491.61$ N N MOE NCB RCC Millad Wasel Constructio company10 WU 120 Khaton Qala School 112,000.00$ 127,470.00$ AFA 5,747,558.70 N N MOE NCB RCC Zaihoon Haidary CC11 WU-121 Aamo School 128,000.00$ 128,000.00$ 127,465.91$ N N MOE NCB RCC Aziz Ghaznin Construction company12 WU-122 Naswane Archi School 128,000.00$ 128,000.00$ 133,834.50$ N N MOE NCB RCC Jamal Zai Construction Company13 WU-123 Kokcha School 80,000.00$ 80,000.00$ 96,021.34$ N N MOE 8 NCB RCC Star Land Construction Company14 WU-124 Bibi Asia Girls School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed15 WU-125 Haji Miralam Girls School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed
16 WU-126 Wakil Jamal Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC Jul-10 Jul-11 New Project Purposed
Sub Total 1,466,000.00$ 128,000.00$
Mar-10
NCB19.1 N MOE
List of Schools of Kapisa Province
RCC
List of Schools of Jozjan Province
NCBN
Shifted from EQUIP I/ Planed for 1389 (To Be Checked Combinely)
List of Schools of Kabul Province
Aug-09
List of Schools of Kundoz Province
List of Schools of Baghlan Province
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
1 NCB23.1 Darulum school 140,000.00$ 140,000.00$ 6853515 N N MOE 10 NCB RCC M/s Nangrahar shaq CC
2WU-101 Shaheed Ahmad Shah Masood
School208,000.00$ 416,000.00$ 152,571.66$ N
N MOENCB
RCCAman Kaream Construction Company
3 WU-101.1 Badi-ul-abad Girls school 208,000.00$ 150,812.64$ N N MOE NCB RCC Aman Kaream Construction Company4 WU-102 naswani qalaei sheekhan 208,000.00$ 416,000.00$ 178,716.48$ N N MOE NCB RCC Aryana Ulfat Construction Company5 WU-102.1 mastora 208,000.00$ 189,958.04$ N N MOE NCB RCC Masir Roshan Construction Company6 WU-103 Badish School 52,000.00$ 104,000.00$ 38,081.91$ N N MOE NCB RCC Ansar Store Construction Company7 WU-104 Shah Gelyan School 52,000.00$ 39,898.48$ N N MOE NCB RCC Husa Construction Company8 WU-106 gumandak 64,000.00$ 64,000.00$ 68,549.27$ N N MOE NCB RCC Mashal Niazi Construction Company9 WU-107 Kaho Girls School 64,000.00$ 64,000.00$ 70,001.64$ N N MOE NCB RCC Mashal Niazi Construction Company
Sub Total 1,204,000.00$ -$
1 NCB4.1 Darulum school -$ 160,000.00$ 160,000.00$ N N MOE 10 NCB RCC Aug-10 Aug-11 New Project Purposed- NCB4.2 Rahe(Do) dara -$ -$ N N MOE 8 NCB Ibeem roofing with GI Sheet changed to CC- NCB4.3 Sheikhar Wali -$ -$ N N MOE 8 dropped because of Social Problem
Sub Total -$ 160,000.00$
1 NCB22.1 Darulum school 140,000.00$ 140,000.00$ 9725877 N N MOE 10 NCB RCC M/s Abdul Nazeef MasoodSub Total 140,000.00$ -$
- NCB30.1 Sarmashkan School -$ -$ N N MOE 8 Dropped as it’s build by an NGO1 WU-108 Qanat Akbarshah School 64,000.00$ 64,000.00$ 74,990.84$ N N MOE NCB RCC Faisal Zabih Construction Company
Sub Total 64,000.00$ -$ List of Schools of Nangrahar
1 NCB11.1 Majboor Abad High School -$ 256,000.00$ 256,000.00$ N N MOE 16 NCB RCC Aug-10 Aug-11 New Project Purposed- NCB11.2 Hale Hunud School -$ -$ MOE 8 Dropped due to land problem2 WU-94 Shamir Baba Primary School 80,000.00$ 80,000.00$ 95,560.78$ N N MOE NCB RCC Masire Roshan Construction Company3 WU-97 Shabi Primary School 80,000.00$ 80,000.00$ 95,502.64$ N N MOE NCB RCC Ghazni Afghan Construction Company4 WU-98 Ali Sher Primary School 64,000.00$ 64,000.00$ 70,295.10$ N N MOE NCB RCC Dawlat Shah Construction Company5 WU-99 Chilie Primary Schhool 64,000.00$ 64,000.00$ 70,186.15$ N N MOE NCB RCC Dawlat Shah Construction Company6 WU-100 Tor Largay Primary School 64,000.00$ 64,000.00$ 67,690.67$ N N MOE NCB RCC Bakhtar Bahar Construction Company7 WU-146 Qalae Akhund Girls middle 80,000.00$ 80,000.00$ $ 86,683.16 AFA 4334158 N N MOE NCB RCC M/s Etihad Khogyani CC8 WU-147 Keptan baba School 80,000.00$ 80,000.00$ $ 87,545.66 AFA4377283 N N MOE NCB RCC M/s Etihad Khogyani CC
Sub Total 512,000.00$ 256,000.00$
List of Schools of Laghman Province
List of Schools of Badakhshan Province
List of Schools of Farah Province
List of Schools of Nooristan Province
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
List of Schools of Khost1 NCB 31.1 Hale Hunud School 112,000.00$ 112,000.00$ 6498293 N N MOE 8 NCB RCC M/s Afghan Imperial CC2 WU-132 Bak High school -$ 64,000.00$ N N MOE NCB RCC Dropped3 WU-129 Abdul hie habebe high school 104,000.00$ 416,000.00$ 101,397.78$ N N MOE NCB RCC Wali Triziwal Construction Company4 WU-129.1 Alfatha high school 104,000.00$ 100,273.50$ N N MOE NCB RCC Rais Construction Compjany5 WU-130 Zakukhill madal school 104,000.00$ 96,220.67$ N N MOE NCB RCC Universal Construction Company6 WU-129.2 Lagan high school 104,000.00$ 98,783.74$ N N MOE NCB RCC Ajmal Hasas Construction Company7 WU-130 Achar Primary School 64,000.00$ 192,000.00$ 68,318.00$ N N MOE NCB RCC Rais Construction Compjany8 WU-130.1 Charban Primary school 64,000.00$ 86,260.00$ N N MOE NCB RCC Habib zaiconstruction Company9 WU-131 Meta Khan high school 64,000.00$ 60,356.00$ N N MOE NCB RCC Rais Construction Compjany10 WU-131 Shekh ameer high school 64,000.00$ 128,000.00$ 82,634.64$ N N MOE NCB RCC Awal Jaman construction Company
11WU-131.1 Shaheed Qadir Mohammad Middle
school64,000.00$ 66,511.00$ N N
MOENCB
RCCRais Construction Compjany
12 WU-133 Daragai 64,000.00$ 64,000.00$ 73,614.00$ N N MOE NCB RCC Afghan ImparialSub Total 912,000.00$ -$
1 NCB 25.1 Hale Hunud School 112,000.00$ 112,000.00$ N N MOE 8 NCB RCC 29th November opened and Contract under issue 2 Zarghuna middle Scxhool 78,000.00$ N N MOE NCB RCC Aug-10 Aug-113 Kaka said Ahmad 78,000.00$ N N MOE NCB RCC Aug-10 Aug-114 WU-137 Mashriqi Lycee 104,000.00$ 208,000.00$ N N MOE NCB RCC Aug-10 Aug-115 Shin Ghazi Baba 64,000.00$ 64,000.00$ N N MOE NCB RCC Aug-10 Aug-111 WU-134 Shaheed Khakrezwal girls 260,000.00$ 520,000.00$ 217,488.34$ AFA 10,889,641.00 N Y MOE NCB RCC Ahmad shahi manapal CC2 Shaheed Khakrezwal boys 260,000.00$ 242,859.24$ AFA12159962 N Y MOE NCB RCC M/S Community CC3 WU-134.1 Mia Abdul Hakim 104,000.00$ 624,000.00$ 104,134.64$ AFA 5206732 N N MOE NCB RCC M/S Argasthan CC4 WU-134.2 Shaheed .S.M.Dawod 104,000.00$ 102,391.22$ AFA 5119561 N N MOE NCB RCC M/s Haji Khan CC5 WU-134.3 Shaheed Ab Ahad .K. 104,000.00$ 104,139.46$ AFA 5206973 N N MOE NCB RCC M/S Argasthan CC6 WU-134.4 Zinab Middle school 104,000.00$ 102,717.28$ 5,135,863.91 N N MOE NCB RCC M/s Haji khan construction company
7 WU-134.5 Said Jamaludin Afghani girls 104,000.00$ 110,717.28$ AFA 5535864 N N MOE NCB RCC M/S Mashoor cc8 WU-134.6 Haji Miwais Nika 104,000.00$ 119,832.81$ AFA 6,000,029.00 N N MOE NCB RCC Ms/ Niazi Aryan CC9 WU-135 Aino High School 78,000.00$ 234,000.00$ 46,472.00$ AFA 2317563 N N MOE NCB RCC Rashteen AfghanConstruction Compjany10 WU-135.1 Mir Bazaar 78,000.00$ 47,725.00$ AFA2380052 N N MOE NCB RCC New BoostConstruction Compjany11 WU-136 Shahid Abdul latif 78,000.00$ 47,725.00$ AFA2380052 N N MOE NCB RCC New BoostConstruction Compjany12 WU-136 Mir wais Mina/Khaja ayub Ansari 78,000.00$ 65,391.34$ AFA 3,269,567.00 N N MOE NCB RCC M/s Garb Haleem CC13 WU-136.1 Mirwais mina Girls 78,000.00$ 63,035.44$ AFA 3151772 N N MOE NCB RCC M/s Gulishatn sistan14 WU-137 Said Abad 78,000.00$ 59,151.36$ AFA 2957568 N N MOE NCB RCC M/sJaved Masood cc15 WU-136.2 Mahmmud Tarzi 104,000.00$ 94,819.02$ AFA 4,740,951.00 N N MOE NCB RCC M/s Mashoor CC16 WU-139 Barak Nika 78,000.00$ 156,000.00$ 45,909.11$ AFA 2,288,569.00 N N MOE NCB RCC Noor Hami co17 WU-140 Madrasa Deni 78,000.00$ 47,779.73$ AFA 2,381,819.00 N N MOE NCB RCC Arian Mutalid c.c18 WU-141 Maulawi Abdul Waseh 64,000.00$ 128,000.00$ 60,011.12$ N N MOE NCB RCC New BoostConstruction Compjany19 WU-141.1 Baba Wali Saib 64,000.00$ 60,023.16$ N N MOE NCB RCC New BoostConstruction Compjany20 WU-142 Madrasa Deni 78,000.00$ 78,000.00$ 61,741.92$ AFA 3,087,096.00 N N MOE NCB RCC Ms/ Habeeb Bashar CC
21WU-143 H. Jamal Karz/Shin ghazi baba high
school64,000.00$ 64,000.00$
60,716.26$ AFA 3035813N N
MOENCB
RCCNew BoostConstruction Compjany
22 WU-144 Bala Zhara 78,000.00$ 78,000.00$ 61,766.71$ N N MOE NCB RCC Al Hudq Nazif cons.companySub Total 2,656,000.00$ -$
List of Schools of Kandahar
Shifted from EQUIP I/ Planed for 1389WU-136
Dollars AfghanisExpected Bid opening date
Date of Delivery/ Completion
S. No.Responsible Agency
Package No
Name of School Estimated Cost in USD
EstimatedTotal Package
cost
Actual lot price
Revised Estimated Cost in USD
Planned/Actual Date
Name of Supplier/ Contractor/ Domestic Preference
IDA Prior Review (Y/N)
Type of Construction
No. of Classrooms to be built
Type of Contract
1 NCB 30 Babaji School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-20112 NCB 30.1 Qarghab Sofla School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-20113 NCB 30.2 Qarghab School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011
Sub Total 384,000.00$ -$
- WU-150 Darul Ulum School -$ -$ $ 113,600.54 5,680,027 N N MOE NCB Dropped due to land problemSub Total -$ -$
1 NCB 40 Baba Hotak High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed2 NCB 40.1 Babagak Midle School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed3 NCB 40.2 Zarghona Primary School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed
Sub Total 384,000.00$ -$
1 NCB 50 Darulom Islami 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed2 NCB 50.1 Hayat baba High School 128,000.00$ 128,000.00$ N N MOE 8 NCB RCC 10-Aug-2010 10-Aug-2011 New Project Purposed
3 NCB 50.2Shaheed Payenda Mohammad Khan High
128,000.00$ 128,000.00$ N NMOE
8 NCB RCC10-Aug-2010 10-Aug-2011
New Project Purposed
Sub Total 384,000.00$ -$
177 Total 20,076,347.40$ 6,304,000.00$
177 Grand Total 26,380,347.40$
List of Schools of Zabul
Hilmand Province 11 Urban Schools
List of Schools of Paktika
List of Schools of Faryab
New Projects Purposed
Contract Signing/ Actual
Date of Contract Signing
Date of Delivery/
Completion
1 2 3 4 5 6 7 8 9 10 11 12
1 WP13 Construction of Nangarhar PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I
Not Contracted 1389
2 WP15 Construction of Takhar PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I
Not Contracted 1389
3 WP16 Construction of Ghazni PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I
Not Contracted 1389
4 WP21 Construction of Ghor PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I
Not Contracted 1389
5 WP22 Construction of Qunduz PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 3-Sep-011Shifted from EQUIP I
Not Contracted 1389
6 WP25 Construction of Bamyan PED Building 1 130,000.00$ 150,000.00$ NCB N 1-Aug-10 31-Jul-011Shifted from EQUIP I
Not Contracted 1389
7 WP31 Constrution of Noristan PED Building 1 130,000.00$ 130,000.00$ NCB N 1-Aug-10 31-Jul-011Shifted from EQUIP I
On Going 1389
8 WP30 Construction of Daikundi PED Building 1 130,000.00$ 130,000.00$ NCB N 1-Aug-10 31-Jul-011Shifted from EQUIP I
On Going 1389
8 1,040,005.00$ 1,160,006.00$
IDA Prior Review (Y/N)
Planned/Actual Date
Name of Supplier/ Contractor/
Progress of Procurement as
of
To be Completed in
Revised Estimated cost
Procedure/ Method
Total
Estimated Cost OR Actual Contract
Price (with contract currency)
S. No.Contract Package Number1
Name of Contract (Brief Description)
Quantity/ Number
Contract Signing/
Actual Date
Date of Delivery/
Completion 1 2 3 4 5 6 7 8 9 10 11 12 13
1 CC 1.1 Chalatak Primary School Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC 1.2 Quritu Murghab 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC 1.3 Zadmard Primary School Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 1.4 Safidalak Primary School Abkamari 4 -$ Dropped as Built by PRT4 CC 1.4 Chasme gulshah Ghurmach 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above5 CC 1.5 Gudar Primary School Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
6 CC 1.6Najak Lalmey Primary School
Abkamari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
7 CC 1.7 Shorak Primary School Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 1.8 Shewdan Primary School Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 1.9
Dara-e-Tabar Primary School
Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 1.10Shar Share Chaman Qadas -$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Dropped due to security reasons11 CC1.10 Idgah qalae-i-nav 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 New Project Purposed12 CC 1.11Rubat Primary School Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
13 CC 1.12Ghaibali Dasht Girls Primary School
Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
14 CC 1.13Chaprodha Girls Primary School
Qadas 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
- CC 1.14Charkhab Primary School Murghab -$ Dropped due to security reasons15 CC 1.14Buyae Zardalugak Murghab 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed16 CC 1.15Lalah bai Primary School Jwand 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 1.16
Takht-e-Zard Primary School
Jwand 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 1.17
Tagab-e-Alam Primary School
Jwand 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 1.18Dahistan Primary School Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
20 CC 1.19Chashma-e-Sunjid Primary School
Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
21 CC 1.20Qarqach Kandlan Primary School
Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10
- CC 1.21Aab- Barik Murghab 6 -$ Dropped due to security reasons22 CC 1.21Mangan Murghab 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 New Project Purposed23 CC 1.22Dawary / Qadis Khordak Murghab 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 Name of the school changed24 CC 1.23Naswane Kapa Baba Murghab 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1025 CC 1.24Khanaqa Abkamari 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1026 CC 1.25Aab Jaal/Chilanak Jwand 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10 Name of the school changed27 CC 1.26Naswane Dahak Qadis 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1028 CC 1.27Naswane senjedak Muqur 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1029 CC 1.28Jare Shorab Qadis 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1030 CC 1.29Joe Ganj 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-1031 CC 1.30Aka Zai Girls School Balamurghab 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Jun-08 15-Jul-10
1,200,000.00$
Name of School Estimated cost in USD IDA Prior Review (Y/N)
Planned/Actual Date
Type of ContractResponsible
Agency
Sub Total
Ref.NoNo. of Classrooms to be built
CommentsS. No. Type of ConstructionLocation (District)
List of t Schools of Badghis Province
1 CC 2.1 Markaze Kaldar Kaldar 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC 2.2 Shangal Abad Dawlat Abad 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC 2.3 Paikan dara Sholgar 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-104 CC 2.4 Kashanda Sufla Kushenda 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-105 CC 2.5 Qala-e-Razaq Chemtal 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-106 CC 2.6 Ota qul Nahr-e-Shahi 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-107 CC 2.7 Maulawi Rahmatullah Kushinda 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 2.8 Abdul Qader Khumi Mazar-e-sharif 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 2.9 Dewali maidan Balkh 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
10 CC 2.10Rahman Baba Charbolak 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 2.11Tangi girls school Khulm 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 2.12Buzarigh Shor Tepa 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 2.13Khasa Puz Dehdadi 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 2.14Woljatu khulm 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 2.15Shurarq Shor Tepa 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 2.16Mahmoudia Chahr Kant 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 2.17Abdulgan Zaari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 2.18Abuzar ghafari Zaari 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 2.19Dahanu girls Khulm 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 2.20Naswan School Kaldar 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 2.21surkh kocha Charkent 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 2.22Naswane Tukhta Dehdadi 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 2.23Bibi Khadija Sholgar 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 2.24Hayatan Chahi 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 2.25Sayed Qasim Mohammadi Zari 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 2.26Abo Ismat Marmal Marmal 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 2.27Naward kotgai Balkh 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-1028 CC 2.28Marifat High School Mazar-e-Sharif 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-1029 CC 2.29Charsang Girls High Schol Center 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
30 CC 2.30Khoshal Khan Midle School Charbolak 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
31 CC 2.31Block 5 Primary School Center 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed32 CC 2.32Qarye Shahidan School Kholum 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
33 CC 2.33Sayed Ismayel Balkhi SchoolBalkh 10 100,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,628,000.00$ Sub Total
List of t Schools of Balkh Province
- CC 3.1 Maroof Girls School Yakaw Lang 4 -$ Dropped due to security reasons
1 CC 3.1 Lycee markazi yak awlang Yakaw Lang 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed
2 CC 3.2 Siya Bomak middle Yakaw Lang 4 -$ Dropped due to security reasons3 CC 3.2 Daga Schooll Yakaw Lang 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed4 CC 3.3 Shina Akhdarat Girls School Panjab 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-105 CC 3.4 Godar Girls School Panjab 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-106 CC 3.5 Targhai girls School Panjab 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-107 CC 3.6 Kundok Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 3.7 Safid ghare ulya School Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 3.8 Qolba-Tu Girls School Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 3.9 Warezagh School Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 3.10Chartaq School Kohmard 4 32,000.00$ IBEEM Roofing with GI Sheet cc N MoE 15-Aug-08 15-Jul-1012 CC 3.11Do Abi girl School Shebar 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 3.12Baghak girls School Shebar 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 3.13 Sayed Baba Seghan 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 3.14Solej Boys Yakaw Lang 6 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 3.15Zardsang High School Panjab 6 -$ Dropped due to security reasons
16 CC 3.15Turbalaq Panjab 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed17 CC 3.16Pachandor Olya School Waras 6 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 3.17Bayani Girls School Seghan 6 48,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 3.18Khushkak School Shebar 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 3.19Cheraghan School Saighan 5 40,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 3.20Du- Ruy School Kohmard 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 3.21Naswane chijan Waras 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 3.22Darae Chasht Yakaw Lang 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 3.23Sarmqul Yakaw Lang 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 3.24Sachak Girls high School Yakaw Lang 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 3.25Sachak Boys High School Yakaw Lang 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 3.26Payan Bagh Girls School Kohmard 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1028 CC 3.27Samara School Center 4 32,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC 3.28Surkhboom Kerman Panjab 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 3.29Dahane qalacha Panjab 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 3.30Chuye taman Waras 8 64,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1032 CC3.31 Zokor Ajar Kahmard 4 44,000.00$ IBEEM Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1033 CC 3.31Doshakh Girls School Pomar 4 44,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed34 CC3.32 Sare Murghi Girls School Yakwlang 8 88,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed35 CC 3.32Qara ghajor School Waras 8 88,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed36 CC3.33 Eg Primary School Waras 8 88,000.00$ IBEEM Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,576,000.00$
List of Schools of Bamyan Province
Sub Total
1 CC 4.1 Lesa Khohan girls (khohan) Khohan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
- CC 4.2 Saeedan High School Khohan 8 -$ Dropped due to security reasons2 CC 4.2 Roinzar school Khohan 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed3 CC 4.3 Naswan-e-Esmati Khash 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-104 CC 4.4 Zarak Middle School Daraiem 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
5 CC 4.5 Hazara Qadam middle SchoolArgo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
6 CC 4.6 Yakh Daru middle School Ashkashem 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-107 CC 4.7 Lesa Abo Taleha girls Shohada 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC 4.8 Lesa Khohan (khohan) Khohan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC 4.9 Sail Dahan high School Khohan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 4.10Rahan Yawan Ragh 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 4.11Kazda Wardoj 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 4.12Kalar Raghestan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 4.13Naswan Zebak Zaybak 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 4.14Baharstan Baharak 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 4.15Nashur Koof 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 4.16Shahran girls High School Kash 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 4.17Murghak Middle School Arghanchkhoa 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
18 CC 4.18Bajawar Javed high school Sheghnan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
19 CC 4.19Fetrat high school Mayami 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 4.20Ubaghan girls school Shiki 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 4.21Skazar Girls School Keran-menjan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 4.22Anjuman Primary Keran-menjan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 4.23Barragh High School kohistan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 4.24darululume Argo Argo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 4.25Darululum Tashkan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 4.26Jayru ulya Khohan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 4.27Naswan-e-Dorkhan Khash 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1028 CC 4.28Gardang Shar-e-bozork 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC 4.29Gohar Yamgan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 4.30Ayeena Poshta Khor Tashkan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 4.31Chang-e-Bala Jurm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1032 CC 4.32Langar primery Yaftal-e-Payan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1033 CC 4.33Sasht primery School Wakhan 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
34 CC 4.34Khambak-e-bala primery School
Tagab-e-Kishm 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
35 CC 4.35Haft Chinar primery school Kishm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1036 CC 4.36Deh Sangan Jurm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1037 CC 4.37kaj Dara Nasi 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1038 CC 4.38Sare hawz Jurm 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1039 CC 4.39Kanderim Raghestan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1040 CC 4.40Pater Raghestan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1041 CC 4.41Sabet High School Daraiem 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1042 CC 4.42Gandom Qul Kishm 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1043 CC 4.43Naswane Ganda Cheshma Argo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
44 CC 4.44Attachment of Faramand Shaheed Girls
Argo 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
45 CC 4.45Bede Kalan Middle School Hamagan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
46 CC 4.46Charmaghz Dara Girls SchoolKishm 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
47 CC 4.47Nasir Khesraw High School Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1048 CC 4.48Fatimatul Zahra Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1049 CC 4.49Erghisk primary School Yamgan 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1050 CC 4.50Nalwech Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 4.51Khwary Yamgan 8 -$ Dropped due to security reasons
51 CC 4.51Sarab jOkhan Yamgan 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed52 CC 4.52Shinam Yamgan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1053 CC 4.53Ghurmi Yamgan 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1054 CC 4.54Rahe dodara Raghestan 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1055 CC 4.55Zulazma Raghestan 6 66,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1056 CC 4.56moosa khan shahid wakhan 4 60,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1057 CC 4.57Karzai School wakhan 4 60,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
58 CC 4.58Yabab Jurm 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10Project name has been changed from Ghiasi high school to Yabab Midle School
59 CC 4.59Kata wa Qazi Daraiem 6 66,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10Project name has been changed from Yalani to Kata wa Qazi
60 CC 4.60Simorgh Midle School Share Bozorugh 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed61 CC 4.61Spin Girls High School Yaftale Payan 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed62 CC 4.62Darulom Khash Khash 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
3,748,000.00$
List of schools of Badakhshan Province
Sub Total
1 CC 5.1 Markaze Quchin Qi School Eshtarli 6 $ 48,000.00 I-Beam Roofing CC N MoE 15-Aug-08 15-Jul-102 CC 5.2 Sarneli Girls Middle School Center 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
3 CC 5.3 Baghban Girls Middle School Kajran 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
4 CC 5.4Haftad Nafar Boys Middle School
Kajran 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
5 CC 5.5 Barlan Girls Middle School Shahrastan 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC 5.6 Sangan Boys High School Meeramor 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 5.7 Askan Girls High School Meeramor 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC 5.8 Sar Dara Khodi High School Khadeer 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
9 CC 5.9 Dahan-e-Barghas High School Sang Takht 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
10 CC 5.10Kiso Girls High School Keti 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
11 CC 5.11Khakbarak Boys High School Sang Takht 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
12 CC 5.12Tagab Boys High School Meeramor 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 5.13Naglaj Boys High School Eshtarli 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 5.14Shelan High School Eshtarli 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 5.15Ushu Girls Shahrastan 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 5.16Mesh Boys Middle School Center 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 5.17Gerd girls Middle School Shahrastan 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 5.18Sulbi Middle School Meeramor 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 5.19Jangalak Shahrastan 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 5.20monmae Keti 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 5.21Hushi Keti 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 5.22Immam Sadeq Sang Takht 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1023 CC 5.23Sang Chelak Khadeer 5 $ 40,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1024 CC 5.24Naswane Miramor Meeramor 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 5.25Zakure Burlan Shahrastan 6 $ 48,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 5.26Naswane Shah joe Kajran 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 5.27Naswane Sheikh Miran Eshtarli 4 $ 32,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC 5.28Burger High School Meeramor 12 $ 96,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
29 CC 5.29Khadeer Central High school Khadeer 8 $ 64,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
30 CC 5.30Royan Girls High School Keti 10 $ 80,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 5.31Qul Qadeer Center 8 $ 64,000.00 Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC 5.32Sayed Jamaluddin Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1033 CC 5.33Husaini Fakhor Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1034 CC 5.34Sartagab Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1035 CC 5.35Sheran Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1036 CC 5.36Serenj Fakhor Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1037 CC 5.37Fatima Wageer Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1038 CC 5.38Zainabia Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1039 CC 5.39Roqya Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1040 CC 5.40Shiran Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1041 CC 5.41Tagabdar Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1042 CC 5.42Beri Gezab 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
43 CC 5.43Warsal Rebad Girls High School
Miramor 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
44 CC 5.44Kaiso Central High School Keti 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed45 CC 5.45Sewook Shibar Boys School Center 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed46 CC 5.46Largar Boys High School Shahristan 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed47 CC 5.47Tagab Girls High School Miramor 8 88,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
2,368,000.00$
- CC 6.1 Milni Primary School Geeru 4 -$ Dropped due to security reasons1 CC 6.1 dehyak Primary school Dehdadi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed2 CC 6.2 said Ahmad haludal Jaghuri 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-103 CC 6.3 Khwaja Ali Middle Qarabagh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC 6.4 Dari Zabanha Maqur 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC 6.5 Jaka Pashi Malistan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC 6.6 Langarkhail Baba Ajeeristan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 6.7 Patap Gailan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC 6.8 Imam Hussain Kurmurda Nahur 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.9 Malik ibne-Qais Gairu 4 -$ Dropped due to security reasons9 CC 6.9 Parwar dar school Qarabagh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed- CC 6.10 Siaqul Zankhan 5 -$ Dropped due to security reasons
10 CC 6.10 Ansari andar 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed11 CC 6.11 Said Jamaludin Barjagi Nahur 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 6.12 Sanayi Rashidan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Number of classes increased
13 CC 6.13Shaheed Abd.Qayum Surkhak
Waghaz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
- CC 6.14 ubaidullah Landakhail Aabe Band 5 -$ Dropped due to security reasons14 CC 6.14 shahid Abdul Matin Dheyak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed
List of schools of Daikundi Province
Sub TotalList of Schools of Ghazni Province
15 CC 6.15 Ulya Sarab Jaghatu 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.16 Malikdin Nawa 5 -$ Dropped due to security reasons
16 CC 6.16 aghujan Geilan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed17 CC 6.17 Pirykhail Ajeeristan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 6.18 Mawlana Abdul Hai Waghaz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 6.19 Larga Maqur 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 6.20 Mirwal Qarabagh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 6.21 Halyatu Shughla Girls Jaghori 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 6.22 Shaheed Faiz Malistan 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.23 Sarab Ulya Nahure 10 -$ Dropped due to security reasons
23 CC 6.23 Namian Qule shutornurda Nahure 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed24 CC 6.24 Naswane Maknak Malistan 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 6.25 Lahl Big High School Nahure 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 6.26 hujat Ibne hassan Jaghuri 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC 6.27 Ayqulak Jaghuri 8 -$ Dropped due to security reasons
27 CC 6.27 nani School andar 9 72,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 New Project Purposed28 CC 6.28 Khairu Madares Dheyak 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC 6.29 Naswane khaza ali Center 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 6.30 Kalai qazi Center 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 6.31 Malistan Girls High School Malistan 8 88,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,544,000.00$ Sub Total
1 CC 7.1 Garmab High School Lal Sar Jangule 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC 7.2 Zarni High School Tiorah 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-103 CC 7.3 Deh Khwaja Middle School Pasaband 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC 7.4 Oshan Middle School Shahrak 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
5 CC 7.5 Taht-e-Shahrak Middle SchoolShahrak 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
6 CC 7.6 Dai Primary School Tolak 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 7.7 Gharak Primary School Dawlatia 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC 7.8 Qala-e-Gohar High School Chahar Sada 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC 7.9 Tail Bai Nazar School Dawlat Yar 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 7.10Dehad Middle School Dawlat Yar 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
11 CC 7.11Shah Sangan Middle School Pasaband 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
12 CC 7.12That-e-Markaze Tolak High School
Tolak 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
- CC 7.13Khwaja Mohammad Ganjan Middle School
Tiorah 5 -$ Dropped due to community problem
13 CC 7.13Dahane sare sabad Tiorah 5 40,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school14 CC 7.14Dehtali High School Tiorah 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 7.15Allah Yar High Schhool Dawlat Yar 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
16 CC 7.16Karman dashte Safarak MiddleLal Sar Jangule 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
- CC 7.17Payae Hesar Tayura 4 -$ dropped due to security problem17 CC 7.17Zardbead Tayura 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school18 CC 7.18Pay Tab Tayura 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 7.19Khair Nak Saghar 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 7.20That-e Markaz Dawlanya Dawlanya 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 7.21Khwajagan Dawlanya 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 7.22Deh Haji Chahar Sada 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 7.23Naswane Talmistan Pasaband 4 -$ Dropped as it is built by NADERA
23 CC 7.23Roof Pasaband 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC 7.24Naswane Safidbuz Pasaband 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 7.25Tahaab Tulak 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 7.26Samuchak Teyora 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 7.27Dawlat Yar High School Dawlat Yar 10 80,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 7.28Barah Khana Middle School Dawlat Yar 8 -$ Dropped as it is built by world vision
28 CC 7.28Noor ahmed shahid Chekh-Charan 8 64,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school29 CC 7.29Shuraba Chekh-Charan 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 increase in number fo classrooms30 CC 7.30miyan Tagab Ghalmin Chekh-Charan 6 48,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 7.31Dahoor Chekh-Charan 4 32,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC 7.32attachmnet of Garmba schoollal Sar Jangule12 10 100,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1033 CC7.33
attachment of SHURABA school
Chekh-Charan 6 60,000.00$ Ibeem Roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1034 CC 7.33Qalai Jaka Primary School Dawlat Yar 8 80,000.00$ Ibeem Roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,408,000.00$
List of Schools of Ghor Provice
Sub Total
1 CC8.1 Sar koroh Primary School Shindand 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC8.2 Asfarza Primary School Oba 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-103 CC8.3 Khwaja Malal Primary School
Kushk Rubat-e-Sang
4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC8.4 Kariz Elyas- Dahanae ZulfiqarGulran 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC8.5
Bai Mohammad Primary School
Kohsan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC8.6 Chauni Masjid Primary School Karukh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC8.7 Do Ab Middle School Farsi 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC8.8 Margha Primary School Chasht-e-Sharif 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC8.9 Urayan Shindand 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC8.10 Abgazasht Primary School Kush Kuhna 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1011 CC8.11
Zinda Chashm Girls Primary School
Kush Kuhna 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC8.12
Jafar Baik Khurasani Primary School
Kushk Rubat-e-Sang
6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC8.13 Shakar Ab Primary School Gulran 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
14 CC8.14 Nayeb Ghafor Primary School Kohsan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
15 CC8.15 Mamora Primary School Pashtoon Zarghoon 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC8.16 Joy Naw Primary School Pashtoon Zarghoon 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1017 CC8.17 Khwaja Noh Shindand 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
18 CC8.18 Kareez Padah Primary School Zinda Jan 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
19 CC8.19 Karizak Shindand 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC8.20 Gaw Siya Zinda Jan 6 -$ Dropped due to community problem
20 CC8.20 naswane kabuthat khan Zinda Jan 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school- CC8.21 Kapak Mayan Zinda Jan 6 -$ Dropped due to community problem
21 CC8.21 San jab Zinda Jan 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school22 CC8.22 Deh Minar Zinda Jan 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC8.23 Qalae Turkman Zinda Jan 6 -$ Dropped due to community problem
23 CC8.23 Siya aab Zinda Jan 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC8.24 Deh Gorgan Primary School Ghoryan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC8.25 Chajat Adraskan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC8.26 Dara Jamal Keshke Kuhna 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC8.27 Naswane Peshakan Pashtoon Zarghun 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC8.28 Kamana Kuhsan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1029 CC8.29 Aabe Safid Gulran 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1030 CC8.30 Qalae Sharbat Kurkh 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC8.31 Khame Muzafar Shindand 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC8.32 Ajreen
Keshk Rubate Sangeen
8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1033 CC8.33 Qaraqul Injil 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1034 CC8.34 Gardab Injil 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1035 CC8.35 naswane nawbadan Injil 8 -$ Dropped due to community problem- CC8.35 Naw badam Injil 9 72,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
36 CC8.36 Sahar Khaiz Injil 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1037 CC8.37 Naswane arzaqi Guzara 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1038 CC8.38 Kabisae Farah Siya wasashanGuzara 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC8.39
Qalae Bakhtyari kalatae Behbud
Guzara 6 -$ Dropped due to community problem39 CC8.39 Madarasea ziaratjah Guzara 7 56,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school40 CC8.40 palawanha Karukh 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1041 CC8.41 Naswane dahanae ghar Karukh 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1042 CC8.42 lycee yadgar Zinda Jan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1043 CC8.43 Bazemchi Zinda Jan 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1044 CC8.44 Jafar Baik Kohdani
Koshke Rubate Sangi
8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1045 CC8.45 Khwaja Ubaidullah Herary Injil 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1046 CC8.46 humesh Adraskan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1047 CC8.47 Zardalugak Adraskan 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1048 CC8.48 ziayarat primary Adraskan 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1049 CC8.49 Bande Benafsh Obe 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1050 CC8.50 Esfarza Obe 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1051 CC8.51 saripul Obe 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1052 CC8.52 shaid momand Injil 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
2,776,000.00$
List of Schools of Hirat Province
Sub Total
1 CC 9.1 Bedak Middle School Baraki Barak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC 9.2 Hisarak High School Center 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
3 CC 9.3Hawas Khails Girls Primary school
Baraki Barak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
4 CC 9.4 Paspajak Pingram Charkh 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC 9.5 Mirwal School Center 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC 9.6 Dasht-e-Bahari School Center 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC 9.7 Gozi Middle School Mohammad Agha 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-108 CC 9.8 Topak School Baraki Barak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-109 CC 9.9 Kharoti School Charkh 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1010 CC 9.10Malakai School Charkh 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1011 CC 9.11Raham Abad Middle School Mohammad Agha 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1012 CC 9.12Cheltan Middle School Baraki Barak 6 48,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1013 CC 9.13Babri girls high school Baraki Barak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1014 CC 9.14Qalae Shaki girls school Baraki Barak 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1015 CC 9.15Malik tooth school Mohammad Agha 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1016 CC 9.16Jauzare altamoor school Pule alam 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1017 CC 9.17Ashnapoor Ashnapoor 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1018 CC 9.18Qasim khail Azru 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1019 CC 9.19Takhtak pingaram takhtak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1020 CC 9.20Garmaba garmaba 5 40,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1021 CC 9.21faiz Kariz school padkhab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 15-Aug-08 15-Jul-1022 CC 9.22Qala-e-Sare Sanng Center 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC 9.23Bibi Malalai School Mohammad Agha 6 -$ Droppedas it’s built by community members
23 CC 9.23sare aabparam Mohammad Agha 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC 9.24Khoshi High School Khoshi 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC 9.25Ghazi Khalil Azru 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC 9.26Ibrahim Khail School Baraki Barak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC 9.27Musa Khan School Hazra 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
28 CC 9.28Attachment; Zarghon Shahr High School
Mohammad Agha 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
29 CC 9.29Usman Khail Azru 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1030 CC 9.30Naw Shahr School Charkh 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC 9.31Haji Gardai Kochai Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
32 CC 9.32Sayed Hussain Kamidan Girls School
Center 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
33 CC 9.33Haji Badur School Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed34 CC 9.34Ab bazak Girls School Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
35 CC 9.35Shaheed Engr. Ahmad Shah School
Mohammad Agha 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,664,000.00$
List of Schools of Logar Province
Sub Total
1 CC10.1 Kharoti Girls Middle school Jalrez 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
2 CC10.2Ghazi Mohammad Afzal Primary School
Jaghato 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
3 CC10.3 Dahan Hesar Primary School Hesa Awal 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
4 CC10.4 Bi Bi Hajera Primary School Markaz-e-Behsood 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC10.5 Resalat Primary School Markaz-e-Behsood 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC10.6 Joqol girls Middle School Narkh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
7 CC10.7 Shohadai Abdara High School Sayed Abad 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
8 CC10.8Hazrat-e-Omar Farooq Primary School
Jaghato 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
9 CC10.9Wahdat Dewlan Middle School
Jalrez 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
10 CC10.10Shaheed Shirzad Chak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
11 CC10.11Haidari Baghlan Middle School
Chak 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
12 CC10.12Abdul Mahiyuddin High School
Sayed Abad 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
13 CC10.13Shaheed Ali Raza Primary School
Daimird 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
14 CC10.14Tezak Primary School Hesa Awal 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
15 CC10.15Raqul Behsud 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
16 CC10.16Qazi Gul Mohammad Shaheed Middle School
Narkh 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
17 CC10.17Taitamor Middle School Narkh 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
18 CC10.18Dabkazar High School Chak 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
19 CC10.19Ghazi Esmatuulah Daimird 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
20 CC10.20Alisha Chak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
21 CC10.21Deh kherqa Primary Narkh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
22 CC10.22Chugh hura Narkh 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
23 CC10.23Bibi Fatima Primary Chak 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
24 CC10.24Awra Primary Sayed Abad 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
25 CC10.25Shaheed Ahmadshah PrimaryJaghato 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
26 CC10.26Inqelab Primary Daimird 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
27 CC10.27Sharhe Niru Primary hesa Awal Behsud 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
28 CC10.28Siya Qoot Primary Center of Behsud 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
29 CC10.29Khatamul Anbiya Middle Center of Behsud 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
30 CC10.30Khalid Bine Walid maidan Shahr 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
31 CC10.31aqcha primary Narkh 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
32 CC10.32Shaheed Izatullah School Sayed Abad 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
33 CC10.33Do Aab Helmand Primary School
Behsud 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
34 CC10.34Mami Khail girls School Center 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10
35 CC10.35Amar Baba Girls Middle Center 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10
36 CC10.36Aab Kazar High School chak 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
37 CC10.37Sang Shanda High school Behsud 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
38 CC10.38Attachment of Raqul Behsud 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
- CC10.39Unkhi High School Sayed Abad 10 -$ Changed to NCB
40 CC10.40Shikh Abad High School Sayed Abad 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
List of Schools of Maidan Wardak Province
41 CC10.41Shahadat High School Chak 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
42 CC10.42Bid Mushk Khudai Nazar Midle School
Jaghato 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
43 CC10.43Badam Dara Primary SchoolSayed Abad 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,980,000.00$ Sub Total
1 11.1Mohammdi Saibzada High School
Behsood 8 64,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE 01-Aug-08 15-Jul-10
2 11.2 Trelai School 8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed3 11.3 Gandomak School 8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed
4 11.4Qalai Muqam Khan Girls School
8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed
5 11.5 Afghan Mena School 8 80,000.00$ Ibeem roofing with GI sheetIbeem roofing with GI sheet CC MOE Sep-10 Sep-11 New Project Purposed
384,000.00$
1 CC12.1 Rooqyan School Aryoub Jaji 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC12.2 Shakar Khail School Gardiz 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10- CC12.3 Fatih Khail School Zurmat 4 -$ Dropped due to community problem3 CC12.3 Kal a niazi gardiz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school4 CC12.4 zandi Khail School Ahmad Abah 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC12.5 Charago Kelay School Laja Mangal 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.6 Sultan Khail Primary School Kardah Heeri 4 -$ Dropped due to community problem6 CC12.6 zahu school Gardiz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school7 CC12.7 Khwaja Hasan School Gardiz 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC12.8 Moshka School Ahmad Khail 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC12.9 Matwarakh School Butan 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC12.10Garami School Chamkani 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1011 CC12.11Darka School Chamkani 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC12.12Rubat School Jani Khail 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.13Gerda serai Gerda Serai 5 -$ Dropped due to community problem
13 CC12.13mari Khail school Aryoub Jaji 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school14 CC12.14Qala-e-Sharif High School Aryoub Jaji 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC12.15Banuzai Middle Gardiz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC12.16Rubat School Gardiz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1017 CC12.17Darul Hefaz Hazrate Bilal Gardiz 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
- CC12.18Balk Khail middle school Jani Khail 6 -$ Dropped due to community problem
18 CC12.18Muti school Ahmad Khail 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
19 CC12.19Orgul middle school Chamkani 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.20Karezgai Primary Gerda Serai 4 -$ Dropped due to community problem
20 CC12.20kariz school Said Karam 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
21 CC12.21Hazar Dara middle School Jaji 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
22 CC12.22Akhund khail primary Ahmad Abah 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.23Shahree Changa School Zurmat 10 -$ Dropped due to community problem
23 CC12.23Andowan high school Said Karam 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school24 CC12.24Jehad Kalay School Sayed Karam 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC12.25Gul Ghundi High School Aryoub Jaji 10 -$ Dropped due to community problem
25 CC12.25Karez primary school Said Karam 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school26 CC12.26Khailan High School Said Karam 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC12.27Naswane Rude Ahmadzai Ahmad Abah 10 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC12.28Machal Gho Girls School Ahmad Abah 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed29 CC12.29Dawlat Zai School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed30 CC12.30Ahmad Khil Midle School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed31 CC12.31Nargisi School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed32 CC12.32Qalai Mahmod School 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed33 CC12.33Ibrahim Khil Girls School Center 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed34 CC12.34Kata Khil Girls School Jaji Ayob 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,784,000.00$
List of schools of Paktia Province
List of Schools of Nangrahar
Sub Total
Sub Total
1 CC13.1 Korabah Middle School Shatal 5 45,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC13.2 Faraj High School Anaba 5 -$ Dropped due to land problem2 CC13.2 Par shahar Anaba 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project3 CC13.3 Kar Abdara Primary School Anaba 6 54,000.00$ CC N MoE 15-Aug-08 15-Jul-104 CC13.4 Badqol Girls Middle School Center 5 70,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10
5 CC13.5Ayesha Seddiqa No. 1 Primary School
Said Karam 5 70,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10
6 CC13.6 Paranda Primary School Center 5 70,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-10- CC13.7 Tankhu Dara 4 -$ Dropped due to land problem7 CC13.7 Khaja Primary Dara 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
8 CC13.8 Astana Kalan Primary School Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
9 CC13.9 Naswane umarz Dara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
10 CC13.10Royedae Shatal Shatal 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
11 CC13.11Bibi Ayesha Seddiqa No. 2 Primary School
Rakhah 5 45,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
- CC13.12Khawaja Arif Primary School Paryan 5 -$ Ibeem roofing with GI Sheet Dropped as it is already built by PRT
12 shalkacha Paryan 5 45,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
13 CC13.13Faraj High School Anaba 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
14 CC13.14Zamankor Primary School Anaba 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
15 CC13.15Naswane Abdullah Khail Dara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
16 CC13.16Massoud Shaheed Hissa Awal 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
17 CC13.17Abd.Wadood Shaheed MiddleDara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
18 CC13.18Astana Kalan Middle School Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
19 CC13.19Tariq Bin Ziyad Dara 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
20 CC13.20Jamal warda Primary Rakhah 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
21 CC13.21Madrase Dinee Dara Roy Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
22 CC13.22Naswane Tamina Dara 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
23 CC13.23Naswane Tankhu Dara 6 54,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Change in amount as it needs extra work
- CC13.24Perengal/Pasgaran Dara 4 32,000.00$ Dropped as it is already built by PRT
- CC13.25Gulabuddin Shaheed High School
Shatal 8 -$ Dropped as it is already built by PRT
24 CC13.25Madrase dini Shatal 8 64,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
- CC13.26Malak Mirza Shaheed High School
Dara 10 -$ Dropped as it is already built by PRT
25 CC13.26Kharau Girls Hissa Awal 10 80,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school
- CC13.27Baba Ali Girls Primary School Dara 10 80,000.00$ Dropped as it is already built by PRT
26 CC13.28Sang Gana Girls high SchoolCenter 8 64,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10
27 CC13.29Madrasae Abu-Hanifa Paryan 8 64,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10
28 CC13.30Unaba high School Unaba 10 80,000.00$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10
29 CC13.31Piawasht School Roofing -$ Ibeem roofing withGI Sheet CC N MoE 15-Aug-08 15-Jul-10 Dropped (Build by other source)
1,611,000.00$ Sub Total
List of schools of Panjsher Province
1 CC14.1 Yakhdara Siah Gard 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-102 CC14.2 Bibi Sangari Girls School Center 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-103 CC14.3 Sardara Girls School Shinwari 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-104 CC14.4 Khak-e-Ghulam Ali Shiekh Ali 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-105 CC14.5 Joqol School Shiekh Ali 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-106 CC14.6 Dahan-e-Rubat Girls School Shiekh Ali 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-107 CC14.7 Shaheed Haqbeen Surkh Parsa 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-108 CC14.8 Dawlat khani Girls School Surkh Parsa 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-109 CC14.9 Shamal Khail Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1010 CC14.10Sharkai Girls School Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1011 CC14.11Durrani Girls School Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1012 CC14.12Numan Khail Koh-e-Safi 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC14.13Chap Qol Primary School Jabal Saraj 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1014 CC14.14Babah Khail Girls School Center 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC14.15Siyatank Koh-e-Safi 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC14.16Angur Dara Koh-e-Safi 5 40,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC14.17Mandi Qul Koh-e-Safi 6 -$ Dropped as built by PRT
17 CC14.17Naswane Mandi Qul Koh-e-Safi 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school18 CC14.18Qalae Bayazid Bagram 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1019 CC14.19Qalae Zhala Bagram 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1020 CC14.20Ro Aaab Salang 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC14.21Salah Khan Salang 4 -$ Dropped as the school is not a formal School
21 CC14.21KHWAJA Shahwali Salang 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school22 CC14.22Baba khail Ghorband 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1023 CC14.23Ghambaki Ghorband 4 32,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1024 CC14.24Khakrez Middle School Surkh Parsa 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1025 CC14.25Naswane Dahane Khakrez Surkh Parsa 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1026 CC14.26Yakh Dara Ghorband 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1027 CC14.27Madrase qamchaq Surkh Parsa 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1028 CC14.28Zakhure qutondar Ghorband 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1029 CC14.29Sahadat charikar 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1030 CC14.30madrase haqan ia shaikali 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1031 CC14.31Madrase saranwal hujat Surkh Parsa 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1032 CC14.32Gunbad darae quli baheer Shinware 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
33 CC14.33Madrsae Maulawi yar Mahamud
Shinware 12 96,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10
34 CC14.34Kuhnadeh shinware 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1035 CC14.35Madrasae Haqania sheikh Ali 6 48,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1036 CC14.36Sadat Primary Charikar 6 60,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-10- CC14.37Saranwal Hujat Surkhe Parsa 6 -$ Dropped due to land problem
37 CC14.38Neyazi School Bagram 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed38 CC14.39Sofi Khil School Shinwari 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed39 CC14.40Shikhan Midle School Kohe Safi 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed40 CC14.41Wazghar High School Sia Gerd 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed41 CC14.42Samanderya High School Sia Gerd 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed42 CC14.43Numanya Ashtar Kheel Shinwari 8 80,000.00$ Ibeem roofing with GI sheet N MoE Sep-10 Sep-11 New Project Purposed
2,116,000.00$
List of Schools of Parwan province
Sub Total
1 CC26.1 Farashqan Kalan School Sancharak 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC26.2 Qazaq Malak School Sozma Qala 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC26.3 Jarghan School Kohistan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC26.4 Angushta School Siad 8 -$ Dropped as built by UNICEF4 CC26.4 SHAMAKAI charas School Kohistan 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school5 CC26.5 Korak Saripul 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-106 CC26.6 Pushtae Ali Saripul 4 56,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-107 CC26.7 Naswane Angute Uzbakia Saripul 6 84,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-108 CC26.8 Baghawi Olya Midle School Center 8 80,000.00$ RCC CC N MoE 15-Aug-08 15-Jul-109 CC26.9 Shakh Dara Balkhab Balkhab 4 40,000.00$ RCC CC N MoE Sep-10 Sep-11 New Project Purposed
10 CC26.10Kharkhash Midle School Center 8 80,000.00$ RCC CC N MoE Sep-10 Sep-11 New Project Purposed11 CC26.11Yolturab School Gosfandi 8 80,000.00$ RCC CC N MoE Sep-10 Sep-11 New Project Purposed12 CC26.12Mirza walang School 12,000.00$ Last installment to be paid13 CC26.13 tholo School 18,000.00$ Last installment to be paid14 CC26.14Shaheed Safdari School 12,000.00$ Last installment to be paid
792,000.00$
1 CC16.1 Katak Jar Middle School Katak Jar 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC16.2 Qara Tapa Primary School Qara Tapa 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC16.3 Chaila Primary School Chailah 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-104 CC16.4 Bashir Abad Middle School Center 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-105 CC16.5 Tarma Bhai Primary School Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
6 CC16.6 Khwaja Khalil Primary School Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
7 CC16.7 Yak Zarang Primary School Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
8 CC16.8Shorcha Markaz Primary School
Center 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
9 CC16.9Hazrat-e-Usman Middle School
Bad Guzar 10 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
10 CC16.10Tabatash Chapdarah Rustaq 12 96,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC16.11Ishan abad Yangi qala 12 96,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC16.12Punbak School Chal 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1013 CC16.13Hazrate zaid School Rustaq 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1014 CC16.14Mansoore Shaheed Bangi 8 64,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1015 CC16.15Maulawi Mahammud Nazar warih 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE 15-Aug-08 15-Jul-1016 CC16.16Tashbolaq School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed17 CC16.17Shosh Dara Primary School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed18 CC16.18Kabir Shaheed School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed19 CC16.19Ghulam Hazrat School Warsaj 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed20 CC16.20Chegam Primary School Center 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed21 CC16.21No 1 Girl High School Rostaq 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed22 CC16.22Omar Farooq High School Rostaq 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed23 CC16.23Namakab High School Namakab 8 80,000.00$ Ibeem roofing with GI sheet CC N MoE Sep-10 Sep-11 New Project Purposed
1,480,000.00$
Sub Total
List of schools of Sar-e-Pol Province
List of Schools of Takhar Province
Sub Total
1 CC17.1 Deh Yahya High School Deh Sabz 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-102 CC17.2 Tara Khail High School Deh Sabz 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
3 CC17.3Abdul jan shaheed High School
Paghman 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
4 CC17.4Deh Araban Qargha High School
Paghman 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
5 CC17.5 Boya Zar Nasiri High School Shakardara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-106 CC17.6 Danishmand High School Shakardara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
7 CC17.7 Hazrat-e-Osman High School Shakardara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
- CC17.8Deh Kalan Mosahi High School
Mosahi 8 -$ Dropped as it is already built by PRT
8 Mosahi sufla School Mosahi 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school9 CC17.9 Alokhail Middle School Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1010 CC17.10Habib Jan Shaheed Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
11 CC17.11Haji Shamalai Khan Shaheed (Newly Established)
Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
12 CC17.12Haji Zafran (Newly Established)
Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
13 CC17.13Botkhak High School Bagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1014 CC17.14Karanda Girls School Kalakan 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1015 CC17.15Abdul Rahman Baba Qarabagh 10 100,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1016 CC17.16Bustan Farza 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1017 CC17.17Guldara Girls Guldara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
18 CC17.18Ghulam Haider Shaheed Primary School
Istalif 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
19 CC17.19Qolchaq Primary School Mir Bachakot 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1020 CC17.20Wyar Ahmadzai Bagrami 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1021 CC17.21Karizmir Girls School Shakardara 5 50,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1022 CC17.22Shamsul- Madares Shakardara 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1023 CC17.23Madrasae Muskinya Farza 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1024 CC17.24Yakhdand Primary Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1025 CC17.25Tehzine Ulya Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1026 CC17.26Naswane Daku Mir Bachakot 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10- CC17.27Dabilli Sarobi -$ Dropped asit is not a formal School
27 CC17.27In zerai Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school- CC17.28Loy kelai Sarobi -$ Dropped asit is not a formal School
28 CC17.28waka Khas Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school- CC17.29Zarandai Kas -$ Dropped asit is not a formal School
29 CC17.29Sezelai Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school30 CC17.30Mainz Ghundi Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10- CC17.31Marwasa -$ Dropped asit is not a formal School
31 CC17.31Shurab Chashhma Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school- CC17.32Tu Tu Kas -$ 15-Jul-10 Dropped asit is not a formal School
32 CC17.32Sapar abdullah zai Sarobi 4 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school33 CC17.32Omarzai Girls School Shakar dara 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
34 CC17.32Qalai Wazir Girls High SchoolBagrami 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
35 CC17.32Baba Qashqar Girls Primary School
Deh Sabz 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
36 CC17.32Madrasa Sarenwal Janatgul Bagrami 10 100,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed37 CC17.32Koshkak Boys, Girls School Paghman 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
2,410,000.00$
List of Schools of Kabul Province
Sub Total
1 CC18.1 Char Qala Primary School Narang 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-102 CC18.2 Tango Primary School Sarkani 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-103 CC18.3 Zor Barol High School Dangam 10 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-104 CC18.4 Barikot Girls Primary School Nari 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-105 CC18.5 Muhabat Kalay High School Dara-e-Pech 8 $ 64,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-106 CC18.6 Barchaki Primary School Asad Abad 6 $ 84,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-107 CC18.7 Bargame Wasat Nari 12 $ 96,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10- CC18.8 Qalauna primery 8 $ - CC N MoE completed8 CC18.9 Darul uleme Chawki chawki 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-109 CC18.10Shikhan Midle School Center 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
10 CC18.11Kochyan oh Bila School Sarkani 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed11 CC18.12Nangalam Girls School Darai Pich 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed12 CC18.13Shegai Primary School Usmar 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed13 CC18.14Belai Primary School Sawkai 8 $ 80,000.00 Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed14 CC18.15Chiragul School $ 12,000.00 Ibeem roofing with GI Sheet Last installment to be paid15 CC18.16Degal School $ 12,000.00 Ibeem roofing with GI Sheet Last installment to be paid16 CC18.17Shinkorak School $ 22,000.00 Ibeem roofing with GI Sheet Last installment to be paid17 CC18.18Andar Lachak $ 12,000.00 Ibeem roofing with GI Sheet Last installment to be paid18 CC18.19Bithal $ 80,000.00 Ibeem roofing with GI Sheet Last installment to be paid
996,000.00$
1 CC19.1Qara Yoot Onchi Primary Schhool
Darzab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-10
2 CC19.2 Qarastoon Primary School Darzab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-103 CC19.3 Peer Gharab Primary School Darzab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-104 CC19.4 Tash Akhor Primary School Qosh Tepa 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-105 CC19.5 Cheghar Girls High School Mangjak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-106 CC19.6 Shakar Qol Primary School Qarqeen 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-107 CC19.7 Qarqeen girls Primary School Khamab 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-108 CC19.8 Khamab High School 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-109 CC19.9 Safar Kol Primary School Aqcha 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1010 CC19.10Alkarbat Primary School Mardyan 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1011 CC19.11Chelak Ganj Middle School Darzab 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1012 CC19.12Aq Bolaq Primary School Qosh Tepa 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1013 CC19.13Naswane Arabha Qosh Tepa 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1014 CC19.14Abas girls Primary School Mangjak 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1015 CC19.15Qazan Naro Primary School Faizabad 6 48,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1016 CC19.16Niswaney haider abad Aqcha 6 48,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1017 CC19.17Beljah abdul rahman Mangjak 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1018 CC19.18Niswaney sheshah khanah Faizabad 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1019 CC19.19Niswaney khan aqa Qush Tepa 4 32,000.00$ Ibeem roofing with IG sheet CC N MoE 01-Aug-08 15-Jul-1020 CC19.20Bala Mardyan High School Faizabad 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-10
21 CC19.21Shah Saleem Baba Middle Schhool
Faizabad 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-10
22 CC19.22Shahr-e-Kohna High School Aqcha 10 80,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1023 CC19.23Umar Khan High School Aqcha 10 80,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1024 CC19.24Khanqah High School Khanqah 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1025 CC19.25Khan aqaey sagharan Sheberghan 6 84,000.00$ RCC CC N MoE 01-Aug-08 15-Jul-1026 CC19.26Manguti Primary School Sheberghan 5 70,000.00$ RCC CC N MoE 01-Aug-08 15-Jul-1027 CC19.27Chokanah Darz Aab 8 64,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1028 CC19.28Niswaney darz aab Darz Aab 12 96,000.00$ Ibeem roofing with IG Sheet CC N MoE 01-Aug-08 15-Jul-1029 CC19.29Kochi Hai Qarawol School Faizabad 8 80,000.00$ Ibeem roofing with IG Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed30 CC19.30Qazal Qeshlaq Girls School Darzab 8 80,000.00$ Ibeem roofing with IG Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed31 CC19.31Sardari Girls School Darzab 8 80,000.00$ Ibeem roofing with IG Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed
1,642,000.00$
List of Schools of Kunar Province
List of Schools of Jozjan Province
Sub Total
Sub Total
- CC20.1Allah Mohammad Shahid Middle School
Center 6 -$ Dropped as it is already built by PRT
1 CC20.1 Hazrath e khalid school Center 6 84,000.00$ RCC CC N MoE 01-Aug-08 15-Jul-10 Replacement of above school
2 CC20.2Daulat Mohammad Shah Middle School
Najrab 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
3 CC20.3Abdul Saboor Shaheed Middle School
Najrab 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
4 CC20.4 Ghulam Mustafa Hisa 2 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-105 CC20.5 Abdul Rashid School Najrab 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-106 CC20.6 Ghazi khankhail Tagab 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-107 CC20.7 Said Aqa Alah Sai 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-108 CC20.8 Hayatullah Alah Sai 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-109 CC20.9 Hamidul madares Tagab 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1010 CC20.10Abu Zar ghafari Najrab 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1011 CC20.11Fatul madares Najrab 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1012 CC20.12Madrasae Khal Mohammad Kohband 10 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1013 CC20.13Salman Farsi Hisa 2 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1014 CC20.14Faiza Tagab 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1015 CC20.15Abdul Manan Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1016 CC20.16Delyar Girls Middle School Najrab 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1017 CC20.17Sultan Khail Middle School Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1018 CC20.18Haq Parast Middle school Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1019 CC20.19Naswane Qala Khan Najrab 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1020 CC20.20Mawlana Abd.Zahir Hisa Awal Kohistan 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1021 CC20.21Naswane Darae kalan Najrab 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1022 CC20.22Naswane mir Ahmad Alah Sai 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1023 CC20.23Hassan Abad middle Alah Sai 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-1024 CC20.24Naswane Shirak Pirak hisa 2 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
25 CC20.25Niak Mohammad Shaheed School
Najrab 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-10
1,508,000.00$
1 CC21.01Feroza Gai Zaranj 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-102 CC21.02Naswane Markaz Primary Zaranj 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-Aug-08 15-Jul-103 CC21.03Danu Gadal Chaqansur 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Jul-104 CC21.04Sistan Middle School Khashrud 12 96,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Jul-10
5 CC21.05Shaheed Gul Mohammad School
Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
6 CC21.06Farkhi School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed7 CC21.07De Morda School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
8 CC21.08Kanak Din Mohammad SchoolCenter 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed
9 CC21.09Shaheed Habib School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed688,000.00$ Sub Total
Sub Total
List of Schools of Kapisa Province
List of Schools of Nemroz Province
- CC22.01Mandighar girls Kamdish 6 -$ Dropped due to security reasons1 CC22.01Zakure tetin NoorGram 6 48,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project- CC22.02Samarbagh Kamdish 4 -$ Dropped due to security reasons2 CC22.02shtwi girls school parun 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project3 CC22.03Kutya Kamdish 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.04Pule-rustam Kamdish 4 -$ Droppeddue to security reasons4 CC22.04Pashki girls school parun 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project5 CC22.05Gadhwal Mandul 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.06Abzuk Bargimatal 4 -$ Dropped.security reasons6 CC22.06Wamae qadeem Primary wama 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project- CC22.07Dewana-baba Bargimatal 4 -$ Dropped due to security reasons7 CC22.07mashpa primary school NoorGram 4 32,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above project8 CC22.08Darulhulume Bargimatal Bargimatal 8 64,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.09Wadahu NoorGram 5 -$ Built by other source9 Arnas Girls school waigal 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school10 CC22.10Shuk boys school Dawaba 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC22.11kulam girls Dawaba 5 -$ Dropped due to security reasons
11 CC22.11Nashi gram girls school waigal 5 40,000.00$ Ibeem roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above school- CC22.12Suna Gala Nari 5 -$ Ibeem roofing with GI Sheet Dropped due to security reasons- CC22.13Sawu Primery Nari 4 -$ Ibeem roofing with GI Sheet Dropped due to security reasons
12 CC22.14Hamshoz Midle School Waigal 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed13 CC22.15Darul Ulom Waigal Arnas Waigal 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed14 CC22.16Waigal Girls High School Waigal 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed15 CC22.17Jonia Primary School Do Aab 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed16 CC22.18Kolum Girls Midle School Do Aab 8 80,000.00$ Ibeem roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed17 CC22.19Nilab Primary School doab 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid18 CC22.20Piar Girls School doab 23,986.56$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid19 CC22.21Pala Gal School doab 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid20 CC22.22Jonia School doab 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid21 CC22.23Kolam School doab 2,313.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid22 CC22.24Pashgar Girls School NoorGram 5,513.76$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid23 CC22.25Mashook Malik School NoorGram 5,513.81$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid24 CC22.26Kultan/Takra School NoorGram 5,513.81$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid25 CC22.27Mandil/Malil School NoorGram 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid26 CC22.28Shakoorzada School Mandol 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid27 CC22.29Karach School Mandol 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid28 CC22.30Mandool School Mandol 5,513.85$ Ibeem roofing with GI Sheet Shifted from EQUIP I/Last Installment to be paid
$ 824,000.00
1 CC23.01Saalabe Ulya Alingar 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE 01-May 15-Jul-102 CC23.02Salar Sofla Alingar 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed3 CC23.03Karanj Primary School Mehtarlam 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed
4 CC23.04Shaheed Mohammad Ismal Tariq High School
Alingar 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed
5 CC23.05Char Bagh Girls Prmary School
Qarghayee 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed
6 CC23.06Manjan Primary School Ali Shang 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed7 CC23.07Abi Now Primary School Alingar 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Proejct Purposed
$ 528,000.00
List of Schools of Laghman Province
List of Schools of Nooristan Province
Sub Total
Sub Total
1 CC24.01Tarinkoot madrasa Terinkoot 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC24.02Chorah madrasa Chorah 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-103 CC24.03Deh raward Madrasa Dehrawood 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10- CC24.04Gazab Madrasa Gizab 8 -$ Dropped due to security reasons4 CC24.04Kata khanjak Madrasa Terinkoot 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10 Replacement of above5 CC24.05Kahs urozgan Madrasa khas Urozgan 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
6 CC24.06Char chena Madrasa school charchina 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
7 CC24.07Chenarto Madrasa school chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-108 CC24.08Sar chakhli Boys Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-109 CC24.09Sar chakhli Girls Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-10
10 CC24.10Sadmardah Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1011 CC24.11Dehjawz Barakzai Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1012 CC24.12Sarkhum-e- sufla Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1013 CC24.13Jangi karez Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1014 CC24.14Malezi Sufla Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1015 CC24.15Kochian Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1016 CC24.16To To Sufla Dehrawood 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1017 CC24.17Durji Dehrawood 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1018 CC24.18Mukhtalat Now abad Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1019 CC24.19sar kila chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1020 CC24.20Pay kila chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1021 CC24.21Sery School chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1022 CC24.22Naw abad kochyan Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1023 CC24.23Qala Rag chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1024 CC24.24Wacha wyala Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1025 CC24.25Sarchina Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1026 CC24.26Abe-e- Ulya Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1027 CC24.27Kalily chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1028 CC24.28Kotal Chorah 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1029 CC24.29Kuhna Qala-e- Ulia chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1030 CC24.30Zerkoh chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1031 CC24.31Kawrai chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1032 CC24.32Siyah Ghar chenarto 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1033 CC24.33Chorah high School Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1034 CC24.34Jangi Karez Terinkoot 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1035 CC24.35Shin Ghula Dehrawood 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-1036 CC24.36Sahoor School Gizab 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed37 CC24.37Qarya Shiwak School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed38 CC24.38Shah Hussain School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed39 CC24.39Sorkh Murghab School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed40 CC24.40Abas Ali School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Sep-10 Sep-11 New Project Purposed41 CC24.41Garmab Sufla School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid42 CC24.42Babur Quli School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid43 CC24.43Thori School Terinkoot 19,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid44 CC24.44Charamgar Girls School Terinkoot 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid45 CC24.45Sinan School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid46 CC24.46Shnaqala School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid47 CC24.47Sajawal School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid48 CC24.48Sadmurda School Terinkoot 48,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid49 CC24.49Nawabad Salambaba SchoolTerinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid50 CC24.50Safid Khar School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid
51 CC24.51Haramshah / Mianghar SchoolTerinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid
52 CC24.52Sabzabad/Patan School Terinkoot 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid53 CC24.53Wani/Hisar School Terinkoot 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid54 CC24.54Seyaghar School Chinarthu 48,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid55 CC24.55Chalbi School Chinarthu 48,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid56 CC24.56Chinarthu High School Chinarthu 36,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid57 CC24.57Ishfiluq School Chinarthu 10,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid58 CC24.58Sakzai School Dehrawood 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid59 CC24.59Seyasang School Dehrawood 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid60 CC24.60Sharthughii School Dehrawood 18,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid61 CC24.61Warjan School Dehrawood 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid62 CC24.62Kamkooch School Dehrawood 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid63 CC24.63Mazar School Dehrawood 30,000.00$ Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid
3,195,000.00$
List of Schools Of Urozgan Province
Sub Total
1 CC25.1 Peer Md. Kakar high School Zhelae 10 $ 80,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10- CC25.2 Wahab Zai Zhelae 6 $ - Dropped due to security reasons2 CC25.2 Haji Abdul Hanif Zhelae 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above- CC25.3 Pashmul Zhelae 6 $ - Dropped due to security reasons3 CC25.3 Pashmul Primary Zhelae 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above4 CC25.4 shaheedan Ghundai Zhelae 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-105 CC25.5 Madrasae Dinee Zhelae 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10- CC25.6 zala khan primary Panjwai 8 $ - Dropped due to security reasons6 CC25.6 Salehan primary school Panjwai 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above- CC25.7 Talu kan Panjwai 6 $ - Dropped due to security reasons7 CC25.7 shaik kqalandar baba Panjwai 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above- CC25.8 Badizoy Chel Ghor Panjwai 6 $ - Dropped due to security reasons8 CC25.8 Naswane shahrak Panjwai 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10 Replacement of above9 CC25.9 Ghaibana Baba Panjwai 8 $ 64,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-101 CC25.10Timor Shahi High School Center 3,636.00$ Rehabilitation CC N MoE Rehabilitation2 CC25.11Sofi Sahib Girls High School Center 12,005.00$ Rehabilitation CC N MoE Rehabilitation
3 CC25.12Mahmood Hotaki Middle School
Center 2,755.00$ Rehabilitation CC N MoE Rehabilitation
4 CC25.13Zarghuna Ana Middle SchoolCenter 2,578.00$ Rehabilitation CC N MoE Rehabilitation
5 CC25.14Ahmad Shahi Middle School Center 10,854.00$ Rehabilitation CC N MoE Rehabilitation
6 CC25.15Aino Middle School Center 7,267.00$ Rehabilitation CC N MoE Rehabilitation7 CC25.16Nisaji High School Center 16,337.00$ Rehabilitation CC N MoE Rehabilitation8 CC25.17Azimullah Shaheed School Center 5,841.00$ Rehabilitation CC N MoE Rehabilitation9 CC25.18Joe Lahore School Arghandab 5 40,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
10 CC25.19Mullah Mohammad Akbar School
Boldak 5 40,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
11 CC25.20Malak Wazir School Boldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
12 CC25.21Mahmood Jalali Deni MadrasaBoldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
13 CC25.22Ali Nika Wish School Boldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138914 CC25.23Abdul Jabar Khan School Boldak 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138915 CC25.24Hasan Zoe School Takhtapul 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138916 CC25.25Shir Aka Primary School Takhtapul 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138917 CC25.26Farmi Tarnak School Daman 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138918 CC25.27Khoshab School Daman 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
19 CC25.28Shinghazi Baba High Schoolcenter 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
20 CC25.29Zarghuna Ana Middle SchoolCenter 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
21 CC25.30Kaka Sayed Ahmad School Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
22 CC25.31Mashriqi/Sofi Sahib Girls High School
Center 8 64,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
23 CC25.32Faqiranu Kalay/Khalid Bin Walid School
center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
24 CC25.33Piru Kalacha School Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138925 CC25.34Nisaji/Jaikan School Daman 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
26 CC25.35Hazrat Bilal/Shaheed Sardar M. Dawood School
Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
27 CC25.36Gariwal School Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
28 CC25.37Haji Arab/Kotal Morcha School
Center 6 48,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
29 CC25.38Zarghuna Ana Middle SchoolCenter 2 16,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
30 CC25.39Seyori School Nish 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for138931 CC25.40Bagh Agha School Nish 4 32,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
$ 1,517,273.00
List of Schools Of Kandahar Province
Sub Total
1 CC 26.1Dare Ashraf doshi 10 $ 100,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Jun-08 15-Jul-10
2 CC 26.2Attachment of Abdul Razaq Shaheed
6 $ 60,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
3 CC 26.3Speen Joomat Central Baghlan 6 $ 60,000.00 Ibeem Roofing with GI Sheet Oct-10 Oct-11 New Project Purposed5 CC 26.4Abdul Qadir Akhunzada 6 $ 48,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
$ 268,000.00
1 CC 27.1Ghali Khana boys School Doshi 8 $ 88,000.00 Ibeem Roofing with GI Sheet CC N MoE 15-Aug-08 15-Jul-102 CC 27.2Toop Khana Qala 8 $ 88,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC 27.3Dahan Dara Gilam Baf 6 $ 66,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed4 CC 27.4Qarayee Boys 8 $ 88,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
$ 330,000.00
1 CC 28.1Pashto Zhbe School Center 12 $ 96,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed2 CC 28.2Merman Nazo Qesm Awal Center 12 $ 96,000.00 Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC 28.3Sabzgazi School Join Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid4 CC 28.4Chargook Girls School Join Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid5 CC 28.5Qooch Primary School Join Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid6 CC 28.6Nawbar School Pushti Kooh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid7 CC 28.7King School Anardara Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid8 CC 28.8Shashak Girls School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid9 CC 28.9Panjla School center Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid
10 CC 28.10Qalai Mohammad School center Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid11 CC 28.11Ilyas Abad School center Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid12 CC 28.12Boomadiha School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid13 CC 28.13Gink School Pushti Kooh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid14 CC 28.14Chahi Zandan School Pushti Kooh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid15 CC 28.15Farib Girls School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid16 CC 28.16Jorak School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid17 CC 28.17Luftan Girls School joen Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid18 CC 28.18Panjdeh School joen Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid19 CC 28.19Gurgak School anardara Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid20 CC 28.20Kalathi Alam Khan School Anardara Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid21 CC 28.21Dehzak School bala balook Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid22 CC 28.22Pio Pasab School bala balook Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid23 CC 28.23Nang Abad School Khak Safid Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid24 CC 28.24Islamabad School Khak Safid Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid25 CC 28.25Larwand School Purchaman Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid26 CC 28.26Sarmushkan School Purchaman Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid27 CC 28.27Faizabad School Gulistan Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid28 CC 28.28Larthi School Gulistan Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid29 CC 28.29Ghazi Abad School Bakwa Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid30 CC 28.30Shagai School Bakwa Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid31 CC 28.31Kariz Surkha School Shib Koh Ibeem Roofing with GI Sheet Shifted from EQUIP I Last installment to be paid
653,364.00$
1 CC 29.1 Degan Midle School Ismayel Khil 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
2 CC 29.2 Shamal Piran High School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
3 CC 29.3 Maton School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project PurposedSub Total 240,000.00$
1 CC 30.1 Ariana School 4 30,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for13892 CC 30.2 Qari Abdullah 4 40,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for13893 CC 30.3 Rabia Balkhi Girls School 17,771.00$ Rehabilitation CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for13894 CC 30.4 Qari Abdullah -$ 2nd Building Rehabilitation CC N MoE Oct-10 Oct-11 Shifted from EQUIP I/ Planed for1389
87,771.00$ Sub Total
List of Schools of Kabul City Province
List of Schools of Khost Province
461,364.00$
Sub Total
Sub Total
Sub Total
List of Schools of Baghlan Province
List of Schools of Faryab Province
List of Schools of Farah Province
1 CC.31.1 Khwaja Boland School Aybak 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed2 CC.31.2 Abohanifa High School Dare Sorkh Payan 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC.31.3 Chardi Primary School Dare Sorkh Bala 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
4 CC.31.4Abkhorak Ulia Primary School
Roy do aab 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
5 CC.31.5 Galwan Sai Primary School Dare Soof 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
6 CC.31.6 Paytangi School Roy do aab 6 60,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
7 CC.31.7 Karte Mamorin Girls School Markaz 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
500,000.00$
1 CC 32.1Wazir Mohammad Gul Khan School
Archee 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
2 CC 32.2 Kharoti School Center 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed3 CC 32.3 Alchin Midle School Imam Sahib 8 80,000.00$ Ibeem Roofing with GI Sheet CC N MoE Oct-10 Oct-11 New Project Purposed
240,000.00$
1 CC 33.1Karthi Mamorin Girls School
Lashkargah 12,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
2 CC 33.2Karthi Mamorin Boys School
Lashkargah 12,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
3 CC 33.3 Karthi Bolan Lashkargah 16,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
4 CC 33.4 Ahli Hanood Safian Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
5 CC 33.5 Dashthi Bolan Boys School Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
6 CC 33.6 C1 Karthi Lagan Lashkargah 12,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
7 CC 33.7Abul Fathhi Boosthi Middle School
Girashk 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
8 CC 33.8 Boolan Markazi School Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
9 CC 33.9 Hazrat Hamza School Girashk 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
10 CC 33.10C1 Karthi Lagan Lashkargah 16,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
11 CC 33.11Nawamish Baghran School Baghrab 16,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
12 CC 33.12Lashkari Bazar Gharbi School
Lashkargah 8,000.00$ Ibeem Roofing with GI SheetShifted from EQUIP I Last installment to be paid
132,000.00$ 857 43,818,408.00$
Sub TotalList of Schools of Kundoz Province
List of Schools of Samangan Province
Grand Total:
Sub TotalList of Schools of Hilmand Province
Contract Signing/ Actual Date of Contract Signing
Date of Completion
1 2 3 4 5 6 7 8 09-Jan-00 10-Jan-00 11 12 13
1 T1MOE Head of Departments Trainings, Bangaladish
12 $0.00 $0.00 Y 07-Feb-07 30,Jan,08 NA NA Dropped
2 T2 Provincail Trainings 8 $244,725.00 $50,000.00 Y 07-Feb-07 30-Jan-08 NA NAPartially taken place.Details under Compilation
3 T3TED Preparation Training for (India Scholarship Candidates)@419$
204 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped
4 T4Teacher Training upgrading from Grad-12 to Grad-14@100$
10’000 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped
5 T5Teacher Training upgrading to Grad-12@50$
10’000 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped
6 T6 Teacher Training InSet1 Roll Out @65$ 30’000 $1,950,000.00 $232,000.00 Y 01-Feb-07 01-Feb-08 NA NACommittedin bothEquip I and Equip II
7 T7 Teacher Training Scholarship@6615$ 400 $0.00 $0.00 Y 01-Feb-07 01-Feb-08 NA NA Dropped
8 T 8Training for procurement officers of MOE at ASCI,INDIA or any other reputed institute
4 $18,000 $0 N 01-Apr-09 31-Dec-10 NA NA
9 T9 SMC Training 22750 $377,650 $0 Y 10-Aug-10 09-Aug-11 NA NA New Training Proposed
10 T10Provincial Social Mobilization Staff Training
210 $104,760 $0 N 10-Aug-10 09-Aug-11 NA NA New Training Proposed
11 T11Provincial Monitoring & Evaluation Staff Training
1158 $110,010 $0 N 10-Sep-10 09-Sep-11 NA NA New Training Proposed
12 T12 Trainning inside the country for EMIS Staff 5 $7,500 $0 N 10-Sep-10 09-Sep-11 NA NA New Training Proposed
$2,812,645.00 $282,000.00
Name of Contract (Brief Description)IDA Prior Review (Y/N)
Name of Consultant
Grand Total:
Trainings
SL No.Contract Package Number*
Remarks
Planned/Actual Date
Qty OriginallyEstimated Cost
Procedure/ Method
Progress of Procurement as of
Actuals
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
1 2 3 4 5 6 7 8 9 10 11 12 13
1 TE51.1 Senior DT3 Coordinator 8 $128,000.00 $0.00 IC Y 01-Aug-10 31-Mar-11 Vacant N/A
already existing in equip II
2 TE51.2 Senior DT3 Manager 12 $48,000.00 $48,000.00 IC N 21-Mar-10 20-Mar-10Mohammidi gul
Wahidi N/A
already existing in equip II
3 TE51.3 Senior DT3 Manager 12 $48,000.00
$0.00
IC N 01-Jul-10 30-Jun-11 Vacant N/A
already existing in equip II
4 TE51.4 DT3 Technical Advisor 8 $80,000.00
$0.00
IC Y 01-Jul-10 31-Mar-11 Vacant N/A
already existing in equip II
5 TE51.5 DT3 Finance & Admin Officer12 $24,000.00
$0.00
IC N 21-Mar-10 20-Mar-10 Vacant N/A
already existing in equip II
6 TE51.6 DT3 Monitoring Officer 12 $24,000.00
$0.00
IC N 01-Jul-10 30-Jun-11 Vacant N/A
already existing in equip II
7 TE51.7 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Nasrullah N/A
already existing in equip II
8 TE51.8 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Seema N/A
already existing in equip II
9 TE51.9 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Kanishka Shabi N/A
already existing in equip II
10 TE51.10 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Shah Piray N/A
already existing in equip II
11 TE51.11 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ghulam Rabani N/A
already existing in equip II
12 TE51.12 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abdul Aziz N/A
already existing in equip II
13 TE51.13 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Enayatullah
Zaland N/A
already existing in equip II
14 TE51.14 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Sardar Hussian N/A
already existing in equip II
15 TE51.15 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Sherzaman
Abasin N/A
already existing in equip II
16 TE51.16 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Najibullah N/A
already existing in equip II
17 TE51.17 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ali Shah N/A
already existing in equip II
18 TE51.18 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Mohammad Arif N/A
already existing in equip II
19 TE51.19 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Allah
Mohammad N/A
already existing in equip II
20 TE51.20 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Gul Kaarim N/A
already existing in equip II
Remarks
Progress of Procurement as
of
Name of Consultant
In-Service Section (DT3 Program)
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
21 TE51.21 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ghoshma Gul N/A
already existing in equip II
22 TE51.22 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad
Alim N/A
already existing in equip II
23 TE51.23 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Shah
Mohammad N/A
already existing in equip II
24 TE51.24 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad
Hussain Rahimi N/A
already existing in equip II
25 TE51.25 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Sayed Rahim N/A
already existing in equip II
26 TE51.26 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Saif Ul Rahman N/A
already existing in equip II
27 TE51.27 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Besmillah Abid N/A
already existing in equip II
28 TE51.28 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad
Qahir N/A
already existing in equip II
29 TE51.29 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Habib
Sharanwal N/A
already existing in equip II
30 TE51.30 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Shamsull Habib N/A
already existing in equip II
31 TE51.31 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Soorgul Mosadiq N/A
already existing in equip II
32 TE51.32 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Palwasha N/A
already existing in equip II
33 TE51.33 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abdul Saboor N/A
already existing in equip II
34 TE51.34 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Mohammad
Shafi Stanikzi N/A
already existing in equip II
35 TE51.35 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Ahmad Sharif N/A
already existing in equip II
36 TE51.36 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abd Safdar N/A
already existing in equip II
37 TE51.37 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Fazal Rahman N/A
already existing in equip II
38 TE51.38 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Pir Mohammad N/A
already existing in equip II
39 TE51.39 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abd Haq N/A
already existing in equip II
40 TE51.40 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abd Raqib N/A
already existing in equip II
41 TE51.41 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Wazir Gul N/A
already existing in equip II
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
42 TE51.42 DT3 Database Officer 12 $18,000.00 $18,000.00 IC N 21-Mar-10 20-Mar-10 Sadaqat Ali N/A
already existing in equip II
43 TE51.43 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Mustafa N/A
already existing in equip II
44 TE51.44 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Hamid Rehman N/A
already existing in equip II
45 TE51.45 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Sebghatullah N/A
already existing in equip II
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
46 TE51.46 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Mustafa N/A
already existing in equip II
47 TE51.47 DT3 IT Officer 12 $18,000.00 $18,000.00 IC N 21-Mar-10 20-Mar-10Fareedullah
Kharotai N/A
already existing in equip II
48 TE51.48 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Besmillah N/A
already existing in equip II
49 TE51.49 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Gul Rahman N/A
already existing in equip II
50 TE51.50 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Imaduddin N/A
already existing in equip II
51 TE51.51 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Waisuddin N/A
already existing in equip II
52 TE51.52 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10Said Abdul
Salam N/A
already existing in equip II
53 TE51.53 DT3 Monitor 12 $8,400.00 $8,400.00 IC N 21-Mar-10 20-Mar-10 Abdul Matin N/A
already existing in equip II
54 TE51.54 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Solaiman N/A
already existing in equip II
55 TE51.55 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Sharifuddin N/A
already existing in equip II
56 TE51.56 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 vacant N/A
already existing in equip II
57 TE51.57 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Rahimullah N/A
already existing in equip II
58 TE51.58 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 fayaz N/A
already existing in equip II
59 TE51.59 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10M. Qayoum
Bahir N/A
already existing in equip II
60 TE51.60 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Zubair N/A
already existing in equip II
61 TE51.61 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10Said Khalid
Ahmad N/A
already existing in equip II
62 TE51.62 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Hazar Gul N/A
already existing in equip II
63 TE51.63 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10Nangyaly Hashimi N/A
already existing in equip II
64 TE51.64 DT3 Data Entry Technician12 $4,800.00 $4,800.00 IC N 21-Mar-10 20-Mar-10 Fazal Akbar N/A
already existing in equip II
65 TE51.65 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
66 TE51.66 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
67 TE51.67 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
68 TE51.68 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
69 TE51.69 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
70 TE51.70 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
71 TE51.71 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
72 TE51.72 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
73 TE51.73 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
74 TE51.74 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
75 TE51.75 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
76 TE51.76 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
77 TE51.77 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
78 TE51.78 DT3 Data Entry Technician 9 $4,500.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
79 TE51.79 Executive Assistant 9 $10,800.00
$0.00
IC N 01-Jul-10 31-Mar-11 Newly proposed
Newly proposed and approved by
WB
Subtotal: $878,200.00 $500,400.00
Pre-Service Section
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
80 TE52.1 Senior Manager 12 $48,000.00 $40,800.00 IC N 21-Mar-10 20-Mar-11abdul haq rahmati N/A
already existing in equip II
81 TE52.2 Senior Manager Scholarships12 $48,000.00 39600 IC N 01-Feb-10 31-Jan-11gul agha ahmadi N/A
already existing in equip II
82 TE52.3 TTC Development Officer 12 $24,000.00 24000 IC N 14-Dec-09 13-Dec-10 abdul wahab N/A
already existing in equip II
12 $0.00 0 IC N 01-Apr-09 31-Mar-10
already existing in equip II
12 $24,000.00 $16,800.00 IC N 01-Apr-10 31-Mar-11
already existing in equip II
$144,000.00 $121,200.00
84 TE52.5 Curriculum & Standard Development Senior Manager12 $48,000.00
$0.00
IC N 01-Jul-10 30-Jun-11 Vacant N/A
already existing in equip II
85 TE52.6 Curriculum Advisor 12 $196,000.00
$0.00
IC Y 01-Jul-10 30-Jun-11 Vacant N/A
already existing in equip II
86 TE52.7 Research Officer 12 $24,000.00
$0.00
IC N 01-Jul-10 30-Jun-11 Vacant N/A
already existing in equip II
87 TE52.8
Snr. Technical Advisor 12
$196,000.00 $196,000.00
IC
Y 01-Jul-10 31-Mar-11
Amir mohammad
Mansory N/A
already existing in equip II
$464,000.00 $196,000.00
88 TE53.1 Institute Senior Manager 12 $48,000.00
$0.00
IC N 01-Jul-10 30-Jun-11 Vacant N/A
already existing in equip II
$48,000.00 $0.00
89 TE54.1 Computer Operator 12 $6,000 $6,000
IC
N 21-Mar-10 20-Mar-11 Toryalai N/A
already existing in equip II
90 TE54.2 Computer Operator 12 $12,000 $12,000
IC
N 21-Mar-10 20-Mar-11Mirwais Rasouly N/A
already existing in equip II
91 TE54.3 IT Incharge Officer 12 $17,280 $17,280
IC
N 21-Mar-10 20-Mar-11 Ahmad Samim N/A
already existing in equip II
92 TE54.4 Admin/Logistic Officer 12 $17,280
$0.00 IC
N 21-Mar-10 20-Mar-11 Vacant N/A
already existing in equip II
93 TE54.5 Senior procurement officer(at MOE)6 $12,000 $12,000
IC
N 21-Mar-10 15-Sep-10 Matin rasoly N/A
already existing in equip II
94 TE54.6 Procurement Assistant(at MOE)9 $9,000 $9,000
IC
N 21-Mar-10 31-Dec-10 Parviz Samah
already existing in equip II
95 TE54.7 Translator(English-Dari)for Procurement(MOE)6 $24,000 $24,000
IC
N 21-Mar-10 14-Aug-10 Fahim N/A
already existing in equip II
96 TE54.8 Administrative Assistant for Procurement (MOE)9 $24,000 $24,000
IC
N 21-Mar-10 07-Oct-10 Maisara N/A
already existing in equip II
$121,560 $104,280
83
General Services
National Teacher Traninig Institute (NTTI)
Distance Education Officer
Subtotal:
Subtotal:
TE52.4sifatullah saboon N/A
Curriculum & Standards
Subtotal:
Subtotal:
EMIS Development Requirements
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
97 TE55.1 Sr. EMIS advisor 9 $54,000
$0.00
IC Y 01-Jul-10 31-Mar-11 Vacant N/A
already existing in equip II
01-Jan-09 31-Mar-10
already existing in
01-Apr-10 31-Mar-11
already existing in
99 TE55.3 System Developer 11 22000 22000
IC
Y 25-Apr-10 31-Mar-11Mohammad
Ilyas N/A
already existing in equip II
100 TE55.4 Database developers and Programmer10 $22,500 $22,500
IC
Y 10-May-10 31-Mar-11Mirwais
Ahmadzai N/A
already existing in equip II
TE55.5 Database developers and Programmer9 $27,000
IC
Y 01-Jul-10 31-Mar-11 Vacant N/A
already existing in equip II
$156,700 $75,700
101 TE56.1.Sr. Network Administrator 11 $26,840.00 $26,840.00
IC Y 01-May-10 31-Mar-11 Ahmad Shah N/A
already existing in equip II
102 TE56.2.Sr. Database Administrator 10 $24,000.00
$0.00 IC N 01-Jul-10 31-april-11 Vacant N/A
already existing in equip II
103 TE56.3Sr. Technician 10 $14,400.00
$0.00 IC N 01-Jul-10 31-april-11 Vacant N/A
already existing in equip II
104 TE56.4Hardware Technician 12 $17,280.00 $17,280.00
IC N 21-Mar-10 20-Mar-11Mohammad
Shafi N/A
already existing in equip II
$82,520.00 $44,120.00
11 $0.00 $0.00 01-Apr-05 28-Feb-06Mohammad
QaderiN/A
12 $0.00 $0.00 01-Jun-06 31-May-07
18 $0.00 $0.00 01-Jun-07 30-Jun-08
24 $0.00 $0.00 01-Jul-08 26-Jul-08
18 $0.00 $0.00 06-Jan-09 05-Jul-10Shafiq Ahmad
Qarizada
10 $67,000.00 $0.00 01-Jun-10 31-Mar-11 vacant shifted from equip I
13 $0.00 $0.00 01-Jun-05 30-Jun-06
6 $0.00 $0.00 01-Jul-06 31-Dec-06
12 $0.00 $0.00 3-Jun-07 2-Jun-08
6 Months
& 28 Days
$0.00 $0.00 3-Jun-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
10 $14,400.00 $0.00 01-Jun-10 31-Mar-11 vacant shifted from equip I
13 $0.00 $0.00 01-Jun-05 30-Jun-06
4 $0.00 $0.00 01-Jul-06 31-Oct-06
8 $0.00 $0.00 05-Nov-06 30-Jun-07Nadia Sahar
Sidiqi5
Months & 7
Days
$0.00 $0.00 24-Sep-07 28-Feb-08 Matin Rasuly
12 $0.00 $0.00 01-Mar-08 28-Feb-09 Matin Rasuly
12 Months $0.00 $0.00 01-Jan-09 31-Dec-09 Abbas Khan
98 TE55.2 System Analyst
EQUIP Coordinator
$31,200 $31,200
S1.1
Mohammad Salim
Qayum
N
Naveed Bakhshi
N/A
YIC
N/A
Mohammad Ashoor Sabori
Procurement Officer
IC
Finance Officer (Replacement)
IC
N
S1.3
S1.2
Financial Management Specialist Ziaulhaq Safi
N/A
N/A
105
106
107
Subtotal:
Subtotal:
12 IC YHameedullah
Sherani N/A
ICT MANAGEMENT UNIT TEAM
EQUIP CORE TEAM IN THE CENTER
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10 Abbas Khan
10
$18,480.00
$0.00 01-May-10 31-Mar-11 Zubair shifted from equip I
13 $0.00 $0.00 09-Jun-05 30-Jun-06
11 $0.00 $0.00 01-Jul-06 31-May-07
1 $0.00 $0.00 01-Jun-07 30-Jun-07
17 $0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$18,876.00 $18,876.00
01-Apr-10 31-Mar-11 shifted from equip I
Finance Assistant 12 $0.00 $0.00 01-Aug-06 31-Jul-07
17 $0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 08-Oct-08 07-Oct-09
5 months
& 22 days
$0.00 $0.00 08-Oct-09 31-Mar-10
12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11 shifted from equip I
12 $0.00 $0.00 01-Aug-06 30-Jun-07Mohammad
Naeem
12 $0.00 $0.00 01-Apr-07 31-Mar-08
9 $0.00 $0.00 01-Apr-08 31-Dec-08
7 Months
& 8 Days
$0.00 $0.00 24-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$9,600.00 $9,600.00
01-Apr-10 31-Mar-11 shifted from equip I
6.5 $0.00 $0.00 15-Dec-05 30-Jun-06
6 Months
& 23 Days
$0.00 $0.00 01-Jul-06 23-Jan-07
12 $0.00 $0.00 13-Nov-07 12-Nov-08
12 $0.00 $0.00 13-Nov-08 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11 shifted from equip I
10 Months
& 12 Days
$0.00 $0.00 17-Oct-06 29-Aug-07Tamim
Yousafzai
15 Months
& 7 Days
$0.00 $0.00 24-Sep-07 31-Dec-08Mohammad Younus Atah
9 Months
& 29 Days
$0.00 $0.00 02-Mar-08 31-Dec-08 Abass Rahimi
10 motnths& 23 days
$0.00 $0.00 16-Jun-09 21-Apr-10
N/AN
N/A
Maryam Abassi
Munir
N
Husnia Noorzai
N
IC N
Mohammad Afzal
N/A
Mohammad Naeem
Procurement Assistant S1.8
IT Officer
IC
IC
Social Mobilization Specialist
Finance Officer
IC
Social Mobilization Assistant
IC
Senior Program Officer
S1.5
S1.6
S1.4
N
S1.7
N/A
Najibullah Akbari
N/A
N/A
Ghulam Jailani
Mohammad Kabir
Zabiullah Hashemi
111
110
109
108
112
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
8Months &
Days$8,400.00 $8,400.00 22-Apr-10 31-Dec-10
Shifted from EQUIP 1
11 $0.00 $0.00 01-May-10 30-Apr-11 vacant
12 $0.00 $0.00 11-Sep-06 10-Sep-07
15 Months
& 20 Days
$0.00 $0.00 11-Sep-07 31-Dec-08
3 $0.00 $0.00 01-Jan-10 31-Mar-1-
12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jul-06 30-Jun-07 Ahmad Sameer
15 $0.00 $0.00 01-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$9,600.00 $9,600.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
Program Assistant 12 $0.00 $0.00 15-Jul-06 14-Jul-07
17 Months
& 17 Days
$0.00 $0.00 15-Jul-07 31-Dec-08
7 Months
& 21 Days
$0.00 $0.00 10-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
10 Months
& 15 Days
$0.00 $0.00 16-Feb-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 21-Dec-06 20-Dec-07Sayed
Mohammad Momand
10 Months
& 21 Days
$0.00 $0.00 07-Feb-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 Months
& 29 Days
$0.00 $0.00 21-Dec-06 20-Dec-07Abdullah Jan
AhmedzaiMonitoring Officer N
Data Officer
N/A
Najibullah
N
N
N/A
N
Obaidullah Hayran
N/A
N/AEdi Farhad
Masooda Safi
N/A
N
Javid Stanekzai
N/A
Abdul Rahim Wardak
N
IC
Logistic Assistant
S1.9 Social Mobilization Assistant
S1.10
S1.14
S1.13 Provincial Relation Officer
IC
Program Officer
IC
IC
IC
IC
S1.12
117
S1.11115
114
116
113
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant
4 Months
& 16 Days
$0.00 $0.00 15-Apr-07 31-Aug-07Abdullah Jan
Ahmedzai
12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant
8 Months
& 6 Days
$0.00 $0.00 26-Dec-06 31-Aug-07 Murad Shaheed
12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant
8 Months
& 13 Days
$0.00 $0.00 19-Dec-06 31-Aug-07 Abdul Rahim
12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant
8 Months
& 13 Days
$0.00 $0.00 19-Dec-06 31-Aug-07Sidiq ur Rahman
12 $0.00 $0.00 15-Aug-08 14-Aug-09 Vacant
6 Months
& 26 Days
$0.00 $0.00 05-Jan-07 31-Jul-07Mohammad
Naeem
16 $0.00 $0.00 01-Sep-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $14,400.00
$14,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S1.20 Deputy Equip Coordinator
9 Months
& 21 Days
$0.00 $0.00 IC N 11-Dec-06 30-Sep-07 Nader Barak N/A
15 Months
&11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08Abdul Wakil
Hanifi
9 $0.00 $0.00 01-Apr-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$39,600.00 $39,600.00
01-Apr-10
31-Mar-11
Shifted from EQUIP 1
15 Months
$0.00 $0.00 1-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$39,600.00 $39,600.00
01-Apr-10
31-Mar-11
Shifted from EQUIP 1
15 Months
$0.00 $0.00 1-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$39,600.00 $39,600.00
01-Apr-10
31-Mar-11
Shifted from EQUIP 1
Monitoring Assistant
Monitoring Assistant
N/A
IC
N
NIC
Kabir Ahmad Zai
IC
IC
N/A
N Sayed Ali Sajad
N
N
N/A
Sayed Noorullah
N/A
N/A
N/A
N/A
Nader Barak
N
N
Abdul Rahim Wardak
NIC
N/A
ICRegional CoordinatorS1.23
Regional Coordinator
Monitoring Assistant
121
118
S1.21
S1.19
119
120
S1.16
S1.15
Monitoring Assistant
IC
Regional Coordinator
IC
Social Mobilization Junior Officer
S1.22
S1.17
S1.18
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
15 Months
& 11 Days
$0.00 $0.00
01-Sep-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$9,900.00 $9,900.00
01-Jan-10 31-Mar-10
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08 Qaheer Khan
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08 Haji Amanullah
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00$0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S1.28 Regional Social Mobilizer officer9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09 vacant
3 $0.00 $0.00 N 15-Mar-07 14-Jun-07
12 $0.00 $0.00 Y 28-Jun-07 27-Jun-08
5 $0.00 $0.00 7-May-07 6-Oct-07
7 $0.00 $0.00 10-Jan-08 9-Aug-08
5 $0.00 $0.00 1-May-07 30-Sep-07
7 $0.00 $0.00 1-Jan-08 30-Apr-08
11 $0.00 $0.00 IC N 1-Sep-08 31-Jul-09 N/A
12 $48,780.00 $48,780.00 1-Oct-09 31-Jul-10
Following H.E. Instruction, Designation has been changed from Procurement Director to National Procurement Advisor
127 S1.33 Procurement Assistant 11 $7,700.00 $7,700.00 IC N 10-Oct-08 9-Oct-10 Omar N/A
Shifted from EQUIP 1
11 $0.00 $7,700.00 15-Nov-08 14-Nov-09 N/A
12 $8,400.00 $8,400.00 15-Nov-09 14-Nov-10
Shifted from EQUIP 1
12 $0.00 $7,200.00 1-Oct-08 30-Sep-09
5 $0.00 $3,000.00 1-Nov-09 31-Mar-10
12 $9,600.00 $9,600.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09 vacant
Sr. Social Mobilization Advisor
Survey Coordinator-EMIS Project
Transport Assistant
IC
N/A
Regional Social Mobilizer officer
IC
N
N
Procurement Assistant
N/A
N/A
Samiullah Safi
N/A
N/A
Abdul Qayun Ghani
Mohammad Suliman Kakar
NSayed
Naqibullah
Dr. Roshan Rasikh
N
N
N/A
Ehssanullah noori
IC
N/A
126
S1.29
S1.31
S 1.36 Liaisons Officer
Natoinal Procurement Advisor
S1.35
S1.34
IC
NIC Hamid
N
124
S1.27
Jawid Stanekzai
Abdul Wakil Hanifi
Farhad SediqiFinance Officer-EMIS Project IC
S1.30
S1.32
Regional Social Mobilizer officer
IC
IC
IC
Regional Social Mobilizer officer
N
Regional CoordinatorS1.24122
S1.25123
S1.26
N/A129
130
128
125
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
11 $0.00 $0.00 01-May-10 31-Mar-11 Vacant
S1.37 Tracking Database Officer 9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09 vacant
8 Months
$0.00 $0.00 IC N 21-May-08 31-12-08
12 months
$0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $17,280.00 $17,280.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
$536,736.00 $454,756.00
7 $0.00 $0.00 IC Y 01-Jun-06 31-Dec-06 Jeaniene Spink N/A
11 $0.00 $0.00 03-May-09 02-Apr-10
12 $60,000.00 $60,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 4-Jul-06 03-Jul-07
17 Months
& 28 Days
$0.00 $0.00 4-Jul-07 31-Dec-08
12 $0.00 $0.00 Y 11-Jun-06 10-Jun-07
20 Days
$0.00 $0.00 N 11-Jun-07 30-Jun-07
18 $0.00 $0.00 1-Jul-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
12 $0.00 $0.00 16-Jun-09 15-Jun-10
12 $42,000.00 $42,000.00 01-Apr-10 31-Mar-11
already existing in equip II
4.5 $0.00 $0.00 N 15-Jun-06 31-Oct-06
7.5 $0.00 $0.00 1-Nov-06 15-Jun-07
18.5 $0.00 $0.00 16-Jun-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
12 $0.00 $0.00 15-Aug-09 14-Aug-10
12 $54,000.00 $54,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 Y 1-Jun-06 31-May-07
1 $0.00 $0.00 N 1-Jun-07 30-Jun-07
18 $0.00 $0.00 Y 1-Jul-07 31-Dec-08
Finance Officer 7.5 $0.00 $0.00 15-May-06 31-Dec-06
4.5 $0.00 $0.00 1-Jan-07 14-May-07
19 Months
& 17 Days
$0.00 $0.00 15-May-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
3 Months
$0.00$0.00 1-Jan-10 31-Mar-10
12
$39,600.00 $39,600.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 15-May-06 14-May-07
19 Months
& 17 Days
$0.00 $0.00 15-May-07 31-Dec-08
15 $0.00 $0.00 1-Oct-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 12-Sep-09
10 $0.00 $0.00 1-Jun-10 31-Mar-11 vacant
Logistics & Admin Assistant7 $0.00 $0.00 1-Jun-06 31-Dec-07
Snr. Admin and Finance Advisor IC
IC
IC
IC
Y
N
N
N/A
Gulali Monmand
Eng. Yonus
N/AMiajan Mia
Matin Rasuly
N/A
Masooda Safi
N/A
Nargis Nehan N/A
Qudratullah Andar
Snr. Technical Advisor
136
135
Engineering Advisor
Finance & Admin OfficerS.2.7
134
Finance Manager - Payroll
Social Mobilisation Officer
Snr. Policy Advisor
S 1.36 Liaisons Officer
S2.6
Attaullah Wahidyar
Masooda Safi
S2.1
S 1.38
MOE POLICY DEVELOPMENT & CAPACITY BUILDING TEAM
IC N
132
zia Radyar
S2.5
S2.4
S2.3
Human Resource Management Advisor
RIMU Coordinator
YIC
Y
N/A
N/AYDr. Sedeq
Weera
133
130
S2.2
131
Subtotal:
IC
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
5 $0.00 $0.00 1-Jan-07 31-May-07
19 $0.00 $0.00 1-Jun-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
3 Months
$0.00$0.00 1-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 13-May-06 12-May-07
1 Month & 19 Days
$0.00 $0.00 13-May-07 30-Jun-07
18 $0.00 $0.00 1-Jul-07 31-Dec-08
S2.10 IT Manager 12 $0.00 $0.00 IC N 4-Jul-06 03-Jul-07 Salim Hayran N/A
12 $0.00 $0.00 N 1-Jul-06 30-Jun-07
18 $0.00 $0.00 Y 1-Jul-07 31-Dec-08
12 $0.00 $0.00 06-Mar-09 05-Mar-10
12 $35,292.00 $35,292.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Jul-06 30-Jun-07
18 $0.00 $0.00 1-Jul-07 31-Dec-08
5.5 $0.00 $0.00 19-Jul-06 31-Dec-06
5 Months
& 16 Days
$0.00 $0.00 1-Jan-07 16-Jun-07
Finance Manager - Budget & Accounting (Replacement)
16 Months
& 27 Days
$0.00 $0.00 5-Aug-07 31-Dec-08 Zaher Nazari
12 Months
$0.00 $0.00 IC N 5-Jun-09 4-Jun-10
12 $24,000.00 $24,000.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 29-Jul-06 28-Jul-07
17 Months
& 3 Days
$0.00 $0.00 29-Jul-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
12 $20,160.00 $20,160.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10Mohammad
Bilal
5.5 $0.00 $0.00 19-Jul-06 31-Dec-06
6.5 $0.00 $0.00 1-Jan-07 18-Jul-07
1 Month & 13 Days
$0.00 $0.00 19-Jul-07 31-Aug-07
12 $0.00 $0.00 7-Nov-07 08-Nov-08
13 momths
& 23 days
$0.00 $0.00 7-Nov-08 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-11
12 $17,280.00 $17,280.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 7-Nov-08 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
N
IC
IC
NIC
Abdul Wali
N/A
N/A
Wadid ur Rahman
Rahimullah
Haleem Shah
N/A
Jamaluddin Hamid
N
N/A
N/A
N/A
Samima Durrani
Habib Ur Rahman Wayand
Fridoon Satary
Shafi Haqmal
IC
Mohammad Bilal
IC
IC
N
N
Y
Logistics Assistant
Finance Manager - Budget & Accounting
IT Officer/ Database Administrator
IT Officer/ LAN Administrator
IC
Finance Manager - Budget & Accounting
S2.12
S2.15141
S2.14
139
140
Executive Assistant & Advisor to Minister
S2.8137Logistics & Admin Officer
Admin AdvisorS2.9
S2.11138
S2.13
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
6 Months
& 21 Days
$0.00 $0.00 1-Jan-07 21-Jul-07
11 Months
& 30 Days
$0.00 $0.00 2-Jan-08 31-Dec-08 Ziaullah Hashmi
12 $0.00 $0.00 5-Aug-06 04-Aug-07 Zaher Nazari
12 Months
& 22 Days
$0.00 $0.00 10-Dec-07 31-Dec-08 Arian Rahimi
7 $0.00 $0.00 1-Jun-08 31-Dec-08Engr. Abdul
Zohour
3 Months
$0.00 $0.00 1-Jan-10 31-Mar-10
12 Months
$23,520.00 $23,520.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Mar-06 28-Feb-07Mohammad Amin Saraj
10 $0.00 $0.00 1-Mar-08 31-Dec-08 Vacant
8 Months
& 10 Days
$0.00 $0.00 22-Oct-05 30-Jun-06
4 $0.00 $0.00 1-Jul-06 31-Oct-06
12 $0.00 $0.00 1-Nov-06 31-Oct-07
14 $0.00 $0.00 1-Nov-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$16,200.00 $16,200.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S2.20 Donor Coordination Manager12 $0.00 $0.00 IC N 20-Sep-06 19-Sep-07Abdul Wakil
HanifiN/A
12 $0.00 $0.00 28-Oct-06 27-Oct-07 Shazia Saba
10 Months
& 8 Days
$0.00 $0.00 21-Feb-08 31-Dec-08 Sameer Haidari
12 $0.00 $0.00 1-Oct-06 30-Sep-07
15 $0.00 $0.00 1-Oct-07 31-Dec-08
12 $0.00 $0.00 1-Dec-06 30-Nov-07
13 $0.00 $0.00 1-Dec-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 14-Apr-09
11 $0.00 $0.00 IC N 15-Apr-09 14-Mar-10
in lieu of S2.23.Selection will be done after approval of Plan
The designation has been changed from Finance Director to Finance Adviser based on H.E. instructions, but the TOR remains the same.
N
N N/A
N/A
Noorulhaq Farid
N/A
N/A
N/AZiaulhaq Safi
Zia ul Haq Safi
Arian Rahimi
Zaher Nazari
N/A
Ab. Mobeen Quraishee
N/A
N
IC
IC N
IC N
N
S2.19
Finance Adviser
S2.23 IC
ICAdmin Manager
S2.23
S2.22
S2.21 IC
IC
EMIS Specialist
Senior Procurement Officer
Senior. Procurement Officer
144
143
Finance Manager Budget
Executive Assistant to Deputy Minister
Donor Coordination Officer
S2.17142
S2.16
S2.18
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 months
& 15 Days
$48,780.00 $48,780.00 15-Mar-10 31-Mar-11Shifted from EQUIP 1
S2.24 International Procurement Advisor12 $0.00 $0.00 18-Nov-07 17-Nov-08Greesh Kumar
SharmaN/A
S2.25 International Implementation Advisor15 $0.00 $0.00 1-Oct-07 31-Dec-08 Vacant N/A
S2.26 National Procurement Consultant43
Days$0.00 $0.00 IC N 3-Aug-06 21-Sep-06 Najeeb Azizi N/A
12 $0.00 $0.00 11-Jan-07 10-Jan-08
11 Months
& 21 Days
$0.00 $0.00 11-Jan-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 Months
$9,600.00 $9,600.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Mar-07 28-Feb-08
10 $0.00 $0.00 1-Mar-08 31-Dec-08
12 $0.00 $0.00 21-Feb-07 20-Feb-08 Abdul Baseer
10 Months
& 8 Days
$0.00 $0.00 21-Feb-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $40,800.00 $40,800.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S2.30 Monitoring & Evaluations (Schools Survey)15 $0.00 $0.00 IC Y 1-Oct-07 31-Dec-08 Vacant N/A
12 $0.00 $0.00 IC Y 3-Feb-08 2-Feb-09 N/A
$0.00 $0.00 3-Feb-09 2-Feb-10
S2.32 International Database Developer 15 $0.00 $0.00 IC Y 1-Oct-07 31-Dec-08 Vacant N/A
S2.33 National Database Developer 15 $0.00 $0.00 IC N 1-Oct-07 31-Dec-08Mohammad Shafi Afzali
N/A
12 $0.00 $0.00 1-Jun-07 31-May-08
12 $0.00 $0.00 1-Jun-08 31-May-09
S2.35 Procurement Manager
18 Months
10 Days
$0.00 $0.00 IC Y 21-Jun-07 30-Jun-08 Edrees Omarzad N/A
12 $0.00 $0.00 04-Jun-07 03-Jun-08
6 Months
& 27 Days
$0.00 $0.00 04-Jun-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$50,400.00 $50,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 17-Apr-07 16-Oct-07
6 $0.00 $0.00 17-Oct-07 16-Apr-08
8 Months
& 14 Days
$0.00 $0.00 17-Apr-08 31-Dec-08
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
Salim Hayran
N/A
ICSnr. Financial Management Advisor Assad Zamir
N/A
G.V. Narayana Murthy
N/A
Lutfullah Safi
Khwaja Omary N/A
FaizullahS2.27
S2.34
S2.37
S2.31
Team Leader
S2.28
S2.29
International Procurement Advisor
S2.36 Project Manager (Empolyee Registeration & ID Card IssuaICe Project
IC
ICSenior AdvisorVocational & Technical Education
GMU Assistant
Planning, Monioring & Reporting Advisor
Wazir Razi N/A
Ahmad Rateb
N/A
N
Y
N
N
IC
IC
IC N
147
148
146
145
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S2.38
S2.39
Team Leader
Team Leader
N/A
Abdul Ghafar
Akhtar Mohammad
Ahmad Rateb
Mohammad Ameen
N/A
N/A
Zia Ahmad Khwaja N/A
N/AAhmad Bashir
IC
N
IC
IC
N
N
N
N
IC
Team Leader
IC
S2.41
Team Leader
Team Leader151
153
150
S2.40
S2.42
152
149
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
S2.47
N
N
IC
IC
IC
IC
Team Leader
Team Leader
156
158
155
154
S2.46157
S2.44
S2.43
N/A
N/A
Team Leader
Team Leader
Team Leader
Ebad ur Rahman
Mohammad Haroon
Tamim Satari
N/A
S2.45
N
Mohammad Mustafa
N/A
IC
N
Abdul Sami
N
Abdul Khabir MasoudN/A
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$20,120.00 $20,120.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
$0.00 $0.00
Team Leader
N
N
S2.51 Team Leader
163 S2.52
Team Leader
Team Leader
Team Leader
S2.49
S2.50
160
162
S2.48159
161
Noor Agha Ahadyar N/A
IC
N/A
Hamed Hamdard
Abdul Rahman
Zabiullah Noori
N/A
N/A
N
IC
N/A
N
IC N
Haji Yousuf
IC
Ahmad Shaker
IC
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10Ajmal
12
$8,400.00 $8,400.00
01-Jun-10 31-Mar-11
vacant
Shifted from EQUIP 1
6 $0.00 $0.00 01-May-07 31-Oct-07
6 $0.00 $0.00 01-Nov-07 30-Apr-08
8 $0.00 $0.00 01-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07Mohammad Akbar Lagzay
6 $0.00 $0.00 15-Oct-07 14-Apr-08 Vacant
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09 Mohd Rateb
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10Team Leade
r
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09 Ahmad Shaker
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
IC
IC
S2.58 Team Leader
IC
IC
Team Leader
Ahmad Tawab
Hazrat Shah
Team Leader
IC
Team Leader
Team Leader
S2.59
S2.56 Team Leader
Team LeaderS2.57
S2.54
S2.55
170
S2.53
167
165
169
164
168
166
N/A
N/A
IC N
IC
N
Abdul Sami
N/A
N
N
N
Qazi Mohammad Amin
N/A
Nematullah
Ahmad zai
N/A
N/A
Baktash
Hamidullah TokhiN/A
Mehdi
N
Abdul Kabir MoqeemIC
N
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
N N/A
Zabihullah Atal
N
N Sayd Zaher N/A
Frogh Big
Jawedurahman
Team Leader
Team Leader
Team Leader
IC
S2.61
S2.62
S2.64 Team Leader
S2.60
IC
NIC Din Mohammad
IC
IC
S2.63
172
Team Leader
174
173
175
171
N/A
N
Waheedullah
N/A
Farooq Faqor
N/A
Abdul Basir
Ahmad Khalid Nabi
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$8,400.00 $8,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 01-May-07 31-Oct-07
6 $0.00 $0.00 01-Nov-07 30-Apr-08
8 $0.00 $0.00 01-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 17-Apr-07 16-Oct-07 Nesar Ahmad
6 $0.00 $0.00 17-Oct-07 16-Apr-08 Vacant
12 $0.00 $0.00 01-Jan-09 31-Dec-09 Ajmal
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 15-Apr-07 14-Oct-07
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
N/A
Team Leader
IC
N/A
N/A
Haji Habibullah
N/A
N/A
Khyber
IC
N
N
N
N
Amir Mohammad Ulfat
IC
IC
Team Leader
IC
IC
S2.67
S2.66 Team Leader
Team Leader
Team Leader
177
S2.69
180
176
S2.68
S2.65
182
181
Danish
N
N/A
Mohammad Sarwar
Ahmad zamer Rasheedi
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 15-Aug-09 Shah Wali N/A
7.5 $0.00 $0.00 13-Sep-09 31-Mar-10
12 $17,280.00 $17,280.00 01-Apr-10 31-Mar-11 from 10 $0.00 $0.00 1-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 3-Jan-09
12 $0.00 $0.00 4-Jan-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $19,200.00 $19,200.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S2.73Admin Assistant
12 $0.00 $0.00 IC N 14-Dec-07 13-Dec-08Ahmad Shekib
FeraziN/A
12 $0.00 $0.00 15-Dec-07 14-Dec-08 Yalda Hashemi
8 Months
& 19 Days
$0.00 $0.00 12-Mar-08 13-Dec-08
12 $0.00 $0.00 14-Dec-08 13-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$10,740.00 $10,740.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S2.75 Provincial Financial Coordinator
14 Months
& 17 Days
$0.00 $0.00 IC N 15-Oct-07 31-Dec-08 Vacant N/A
S2.76 Logistic Assistant
14 Months
& 17 Days
$0.00 $0.00 IC N 15-Oct-07 31-Dec-08 Vacant N/A
S2.77 Deputy Head of GMU
14 Months
& 17 Days
$0.00 $0.00 IC N 15-Oct-07 31-Dec-08 Vacant N/A
6 $0.00 $0.00 15-Oct-07 14-Apr-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $8,400.00 $8,400.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
189 S2.79 Finance Assistant 9 $8,100.00 $0.00 01-Jul-10 31-Mar-11
Newly Proposed
Newly proposed and approved by
WB
$859,952.00 $851,852.00
12 $0.00 $0.00 01-Jun-06 31-May-07
1 $0.00 $0.00 01-Jun-07 30-Jun-07
18 $0.00 $0.00 01-Jul-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
S2.70
Rahimullah
IC N
Abdul aziz
EQUIP ENGINEERING TEAM
IC
N
N
Procurement Officer
N/A
N
Subtotal:
S2.71
Team Leader
IC
IC
S2.78
S2.74
IC
S2.72
Finance Assistant
Provincial Financial Officer
184
183
187
186
185
N/A
N/A
Jamshid Sediqi
Masooda Samadi
N/AHamidullah
Rahil
NHashmatullah
Momand
Team Leader
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jun-06 31-May-07
1 $0.00 $0.00 01-Jun-07 30-Jun-07
18 $0.00 $0.00 01-Jul-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 14-Apr-07 13-Apr-08
8 Months
& 17 Days
$0.00 $0.00 14-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 14-Oct-06 13-Oct-07
14 Months
& 18 Days
$0.00 $0.00 14-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09Miss Huma
Sadat
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$21,600.00 $21,600.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 08-Oct-06 07-Oct-07
14 Months
& 24 Days
$0.00 $0.00 08-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad
Mustafa
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10 Mansoor Mansori
10 Months and 15 days
$13,986.00 $13,986.00
16-May-10 31-Mar-11Mohammad Rahim
Shifted from EQUIP 1
12 $0.00 $0.00 08-Oct-06 07-Oct-07
14 Months
& 24 Days
$0.00 $0.00 08-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad
Shah
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S3.6
S3.2
Mohammad Zarif
N/A
IC
IC
N/A
Fatema
IC
N
IC
IC
Architect
Civil/Design Engineer
S3.1
S3.4
S3.5
190
Civil/Design Engineer
Civil/Design Engineer
Architect
Architect
191
193
S3.3192
194
195
N
N
Miss Nakila Afzali
Daud
Mohammad Zarif
N
Ziaurahman
Khalilullah
N
N/A
N/A
N/A
Mir Mohammad Tamim
Haroon
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 01-Jun-06 31-May-07
1 $0.00 $0.00 01-Jun-07 30-Jun-07
18 $0.00 $0.00 01-Jul-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$15,984.00 $15,984.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 14-Apr-07 13-Apr-08
8 Months
& 17 Days
$0.00 $0.00 14-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09Miss Nakil
Afzali
3 months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$15,984.00 $15,984.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 14-Apr-07 13-Apr-08Nooria
Haqnegar
12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad
Shah
3 months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$9,000.00 $9,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 6-Jun-07 5-Jun-08 Noor Agha
12 $0.00 $0.00 01-Jan-09 31-Dec-09Mansoor Mansoori
11 $14,652.00 $0.00 01-Jun-10 30-Apr-11 Vacant
12 $0.00 $0.00 15-May-07 14-May-08
7 Months
& 17 Days
$0.00 $0.00 15-May-08 31-Dec-08
3 months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
IC N 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
201 S3.12 Monitoring engineers 9 $9,000.00 $0.00 IC N 01-Jul-10 31-Mar-11 Newly Proposed
202 S3.13 Monitoring engineers 9 $9,000.00 $0.00 IC N 01-Jul-10 31-Mar-11 Newly Proposed
203 S3.14 Monitoring engineers 9 $9,000.00 $0.00 IC N 01-Jul-10 31-Mar-11 Newly Proposed
$182,274.00 $140,622.00
12 $0.00 $0.00 01-Aug-06 31-Jul-07
12 $0.00 $0.00 01-Aug-07 31-Dec-08
11 $0.00 $0.00 01-Feb-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 06-Nov-06 05-Nov-07Eng. Khalilah
Nasih
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
IC
NIC
198
S3.10
200
199
205 S4.2
204
PROVIICIAL EQUIP TEAMS/ Kabul Province
W/S Engineer
S3.11
EQUIP Officer
Abdul Zahour
Mohammad Mustafa
S4.1
IC
IC N
IC
IC
Estimator
IC
Civil/Design Engineer
Surveyor
S3.7
197
S3.9
S3.8
196
IT Officer/ Admin
Kabul Civil Engineer
N
N
Mohammad Shah
N Tamim
N/A
N/A
N/A
Miss Huma Sadat
N/A
N/A
Sayed Jamil Mir
Mir Abdul Qayum
N/AAhmad Seayer
Mohammad
N/A
Maiwand
N
N
Subtotal:
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S4.3 Kabul Civil Engineer 12 $0.00 $0.00 IC N 06-Nov-06 05-Nov-07Eng. Rashid
SharifN/A
12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$10,740.00 $10,740.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 5-Jun-07 4-Jun-08Sayed
Habibullah Pacha
12 $0.00 $0.00 4-Aug-07 3-Aug-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 5-Jun-07 4-Jun-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$67,572.00 $67,572.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,960.00 $12,960.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 Vacant N/A
3 Months
$0.00 $0.00 01-Jan-09 31-Dec-09
12 $0.00 $0.00 IC N 01-Jan-10 31-Mar-10 N/A as assistant
12 $9,600.00 $9,600.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
S4.8 Social Mobilizer
N/A
IC
IC
Kabul City
S4.5
S5.2
S4.7
S5.3
S4.4
IC
S5.1
IC
Social Mobilizer
EQUIP Officer
206
210
209
208
207
Engineer, Kabul City
Finance Officer
N
Engineer
N
IC
211
Finance Officer
Subtotal:
Jawed joya
Mohammad Sediq
Rahimullah Keshaf
N/A
Moh. Ishaq N/A
Masooma
Mohammad Nabi
Hezbullah Zahid
N
N
N
N/A
Sayed Mujtaba
N/A
N/A
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
S5.15
Engineer, Kabul City
Engineer, Kabul City
Ahmad Masoud Khaliq
IC
IC
IC
N
N
NIC
N/A
Sayed Abdul Saboor
S5.5
S5.12
S5.13
IC
IC
N Mohammad Ajmal
N/AAjmal Farid
S5.16
S5.7
S5.14
S5.9
S5.4
S5.8
S5.6
IC
ICEngineer, Kabul City
Engineer, Kabul City
IC
IC
IC
Engineer, Kabul City
Engineer, Kabul City
Engineer, Kabul City
Engineer, Kabul City
IC
Engineer, Kabul City N/A
Mohammad HaroonN/A
N/A
N
N Gulam Nabi
Hamidullah-1 N/A
Gul Ahmad N/A
N
N
Mohammad Bashir
N/A
N/A
S5.10
Engineer, Kabul City
Engineer, Kabul City
N
N
N
N
Engineer, Kabul City
Engineer, Kabul City
S5.11
N/A
N/A
N Mohammad Naeem
Shams ur RahmanN/A
N/A
Abdul Hasib/ Shah Maqsood
IC
Ghulam Rabani
N
Mohammad MasoomS5.17
N/A
Engineer, Kabul City IC
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
6 $0.00 $0.00 10-May-07 9-Nov-07
1 Month & 21 Days
$0.00 $0.00 10-Nov-07 31-Dec-07
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 1-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 1-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 1-Jan-10 31-Mar-10
S5.27
IC
S5.19
S5.21
S5.23
S5.18
S5.25
S5.24
212
S5.29
Fazel Rahim
S5.20
N
NEngineer, Kabul City Mohammad Fahim
Engineer, Kabul City IC
IC
Engineer, Kabul City IC
N/A
Alah Nazar NaqibiS5.22
N/A
Hamidullah-2 N/AN
N
N/A
Engineer, Kabul City IC N
Alah NawazEngineer, Kabul City
Engineer, Kabul City
Engineer, Kabul City IC
IC
Engineer, Kabul City N
N/A
N
N
Mohammad Aslam
N/AGhulam Mohayodin
IC
Ms. Nasima
N/A
N/A
N/A
N/A
N/A
Mansoor
Noor Ahmad
Sayed Akbar
Mohammad Kabir
213
N
N
N
Engineer
Engineer, Kabul City N
Engineer, Kabul City
S5.28 Engineer
IC
N/AICS5.26
IC
IC
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$11,208.00 $11,208.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 5-Jun-07 4-Jun-08Mir Abdul Qayum
12 $0.00 $0.00 1-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 1-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 5-Jun-07 4-Jun-08Sayed
Noorullah
12 $0.00 $0.00 1-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 1-Jan-10 31-Mar-10
12
$9,600.00 $9,600.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
$65,784.00 $65,784.00
12 $0.00 $0.00 01-Jun-06 31-May-07 Sayed Baqir
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jul-06 30-Jun-07 Eng. Besmullah
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
11 $0.00 $0.00 01-May-10 30-Apr-11 Vacant
Shifted from EQUIP 1
12 $0.00 $0.00 01-Nov-06 31-Oct-07
14 $0.00 $0.00 01-Nov-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
11 $0.00 $0.00 01-May-10 30-Apr-11 Vacant
Shifted from EQUIP 1
12 $0.00 $0.00 01-Aug-06 31-Jul-07
1 $0.00 $0.00 01-Aug-07 31-Aug-07
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
Social Mobilizer
Engineer
S6.2
IC
Aseel Khan Ahmadzai
Mohammad Zafar
S5.30
N/A
Engineer
N
IC
N
IC
IC N
N
Eng. Mehrab
219
N/A
Social Mobilizer
S6.3
S6.5220
218
217
215
216
214
NIC
Badakhshan Province
EQUIP Officer
N
Amina Naeemi
Hasan Noorzai
N/A
S5.31
ICN/A
Mohammad Asif
N/AEzatullah
N/A
N
N/A
S6.1
S6.4 Finance Officer
IC
Social Mobilizer
Subtotal:
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$50,400.00 $50,400.00
12 $0.00 $0.00 01-Aug-06 31-Jul-07 Haji Amanullah
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 11-Nov-06 10-Nov-07
13 Months
& 20 Days
$0.00 $0.00 11-Nov-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 16-Apr-07 15-Apr-08
8 Months
& 15 Days
$0.00 $0.00 16-Apr-08 31-Dec-08
9 $0.00 $0.00 01-Apr-09 31-Dec-09 Hidaytullah
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 10-Oct-06 09-Oct-07
14 Months
& 22 Days
$0.00 $0.00 10-Oct-07 31-Dec-08
8 Months
& 9 Days
$0.00 $0.00 22-Apr-08 31-Dec-08 Abdul Salim
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
N
Hussian Shah
N/A
N
221
224
N/A
S7.4
N
Finance Officer
Subtotal:
S7.1
S7.3
EQUIP Officer
S6.6
S7.5225
222
226
223
N/A
Sangin Khan
Eng. Bad shah Gul
Mohammad Wazir
S7.2 Engineer
Khost Province
N
Social Mobilizer
IC
IC
N/A
IC
Qaribullah N/A
Eng. Ahsanullah
N/A
Eng. Mojeebul Rahman
Social Mobilizer
Engineer
IC
N
IC N
IC
Abdullah Stanikzia
S7.6 Social Mobilizer
IC N
N/A
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$44,000.00 $44,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$94,400.00 $94,400.00
Paktika Province
12 $0.00 $0.00 01-Aug-06 31-Jul-07 Azizullah
12 $0.00 $0.00 20-May-07 19-May-08 Moh. Shafiq
12 $0.00 $0.00 25-Jun-07 24-Jun-08
12 $0.00 $0.00 25-Jun-08 31-ma
12
$14,400.00 $14,400.00
01-May-10 30-Apr-11 Vacant
Shifted from EQUIP 1
12 $0.00 $0.00 18-Nov-06 17-Nov-07 Kabulai
12 $0.00 $0.00 1-May-07 30-Apr-08
8 $0.00 $0.00 01-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 07-Jan-07 06-Jan-08 Moh. Shafiq
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Nov-06 31-Oct-07 Sayed Abdullah
12 $0.00 $0.00 25-Jun-07 24-Jun-08
12 $0.00 $0.00 25-Jun-08 24-Jun-09
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,520.00 $11,520.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$73,440.00 $73,440.00
12 $0.00 $0.00 01-Aug-06 31-Jul-07 Abdul Rauf
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
EQUIP OfficerS8.1
NIC
Subtotal:
Social Mobilizer
S8.6
N
IC
232
Subtotal:
229
228
227
230
231
S8.2 N/A
Finance Officer
IC
Engineer S8.3
Eng. AzimEngineer
IC
N
IC N/A
Sayed Ahmad
N
S8.4
S8.5
Social Mobilizer
IC
N
N/A
Mohammad Jawid Noori
Mohd. Shoib N/A
N/A
Baryalai
IC
Abdul Rahman N/A
Kandahar Province
N
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 22-Nov-06 21-Nov-07
13 Months
& 9 Days
$0.00 $0.00 22-Nov-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 28-Nov-06 27-Nov-07
13 Months
& 3 Days
$0.00 $0.00 28-Nov-07 31-Dec-08
9 $0.00 $0.00 01-Apr-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Mar-07 28-Feb-08
10 $0.00 $0.00 01-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$73,440.00 $73,440.00
12 $0.00 $0.00 08-Nov-06 07-Nov-07 Ab. Qahir Qahir
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 03-Dec-06 02-Dec-07
S9.4
S9.5
Engineer
Social Mobilizer
235
Subtotal:
S9.3
Finance Officer
EQUIP Officer
IC
N
IC
IC
N
IC
Social Mobilizer238 S9.6
234
233
239
236
237
IC
S9.2 EngineerSayed
Mohammad Dost
N/A
ICAbdul Bari N/A
N
S9.1 N/ANoor Mohammad
N
Toor Gul
Najeebullah
N
Khalid Zaher
N
N/A
Helmand Province
S10.1 EQUIP OfficerZai-e- Haq
N/A
Masood N/A
N/A
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 Months
& 29 Days
$0.00 $0.00 03-Dec-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 03-Dec-06 02-Dec-07
12 Months
& 29 Days
$0.00 $0.00 03-Dec-07 31-Dec-08
9 $0.00 $0.00 01-Apr-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10 Sheikh Ahmad
11 $0.00 $0.00 01-May-10 30-Apr-11 vacant
12 $0.00 $0.00 01-Mar-07 28-Feb-08
10 $0.00 $0.00 01-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 04-Aug-07 03-Aug-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 04-Aug-07 03-Aug-08 Abdul Wakil
14 Months
& 12 Days
$0.00 $0.00 20-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$62,400.00 $62,400.00
12 $0.00 $0.00 01-Feb-07 31-Jan-08Ghulam
Mohammad
10 $0.00 $0.00 01-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 02-Jan-09 01-Jan-10
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
IC
Architect
Ezatullah Noorulhaq
Abdul Hadi
S10.2
N
Social Mobilizer
IC
N
Engineer N/A
IC
S10.3
Snr. Civil Engineer
245
246
241
242
240
243
244 S10.6
Asadullah
Sayed Akbar N/A
N/A
HamidullahN/A
Nematullah N/A
N/A
N
S10.4 Finance Officer
IC N
IC
UlfatN/A
S10.5
N
Social Mobilizer
IC N
Subtotal:
S11.1
Zabul Province
EQUIP Officer
IC
S11.2
N
Mohammad Nasim
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 IC N 03-Jan-09 02-Jan-10 N/A
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Mar-07 28-Feb-08
10 $0.00 $0.00 01-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,400.00 $11,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 26-May-07 25-May-08
7 Months
& 6 Days
$0.00 $0.00 26-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$71,400.00 $71,400.00
12 $0.00 $0.00 24-Apr-07 23-Apr-08 Roshan Rasikh
12 $0.00 $0.00 23-May-09 22-May-10
10 Months
&7 days $14,400.00 $14,400.00
23-May-10 31-Mar-11Shifted from EQUIP 1
12 $0.00 $0.00 1-May-07 30-Apr-08
8 $0.00 $0.00 01-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 14-Apr-07 13-Apr-08
8 Months
& 17 Days
$0.00 $0.00 14-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months $0.00 $0.00 01-Jan-10 31-Mar-10
Subtotal:
N/A
IC
N
N/A
Jamaludin
S12.1
Social Mobilizer
S12.4
N/A
Finance Officer
S12.3 N/A
N
252
253
254
S12.2
251 EQUIP Officer
S11.3
S11.4 Finance Officer
Social Mobilizer
S11.5
247
248
249
250
IC
IC
Nooristan Province
Moh. Hamayoon
S11.6
Engineer Zabihullah
Ahmad Farid
Ahmad Farhad
Ataullah
Abdul Wahid
Mohammad Muslim Khan
Ibrahimi
Abdul Rahman
Engineer
IC
N/AN
N/AN
Engineer
N/A
N
IC
IC N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$12,000.00 $12,000.00
01-Apr-10 31-Mat-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09 N/A
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1_Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08 vacant
12 $0.00 $0.00 23-May-09 22-May-10
12 $12,000.00 $12,000.00 23-May-10 22-May-11
Shifted from EQUIP 1
$74,400.00 $74,400.00
12 $0.00 $0.00 1-May-07 30-Apr-08
8 $0.00 $0.00 01-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$15,984.00 $15,984.00
1_Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Jun-07 31-May-08
7 $0.00 $0.00 01-Jun-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$17,280.00 $17,280.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-May-07 30-Apr-08
8 $0.00 $0.00 01-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,612.00 $12,612.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Jul-07 30-Jun-08
12 $0.00 $0.00 1-Jul-08 30-Jun-09
12 $0.00 $0.00 7-Jan_09 6-Jan-10
12 $12,612.00 $12,612.00 7-Jan-10 6-Jan-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Jul-07 30-Jun-08
12 $0.00 $0.00 1-Jul-08 30-Jun-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $12,612.00 $12,612.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
262 S13.6 Engineer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
12 $0.00 $0.00 23-Apr-07 22-Apr-08
8 Months
& 8 Days
$0.00 $0.00 23-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
S13.3
Shafiullah
Social Mobilizer
Urzgan Province
S13.2
M. Haroon Durani
N/A
IC
Social Mobilizer
N
S12.5
S13.4
263
260
261
258
257
259
256
255
NIC
S12.6
N/A
Mohammad Akbar
Amanullah N/A
N
S13.1 EQUIP Officer/ProviICial Education Advisor
IC
Subtotal:
Finance Officer
IC
Social Mobilizer
IC
N/AAhmad Jan
N
Ahmed farid
N
N/AEngr. AmdullahEngineer
N
N/ASocial Mobilizer
IC
Karimullah
IC
N
Engineer
N
N/AEng. Naseer
IC
S13.7
S13.5
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,612.00 $12,612.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$83,712.00 $83,712.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
265 S14.2 Finance Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08 vacant
9 $0.00 $0.00 01-Apr-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
6 $0.00 $0.00 12-May-07 11-Nov-07
7 Months
& 20 Days
$0.00 $0.00 12-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 12-May-07 11-May-08Khalilullah
Nasih
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08 Rafiullah
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
269 S14.6
267
264
268
S14.3266
S14.4
S14.5
S14.1
263
N
Mohd. Mohsen
N
N/A
Sediqullah Safi
Ajmal
N/A
Abdul Khalil Mansoori
N/A
N
Engineer
Akbar Hussain
Engineer
N
Daikundi Province
N/A
N/A
Eng. Naseer
IC
IC
EQUIP Officer
IC
S13.7
Social Mobilizer
Subtotal:
Social Mobilizer
Abdul Baseer
IC
Engineer
N
N/A
IC
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
$72,972.00 $72,972.00
12 $0.00 $0.00 20-May-07 19-May-08 Azizullah
7 $0.00 $0.00 1-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$13,380.00 $13,380.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 20-May-07 19-May-08
7 Months
& 12 Days
$0.00 $0.00 20-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 20-May-07 19-May-08
7 Months
& 12 Days
$0.00 $0.00 20-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 21-May-07 20-May-08
7 Months
& 11 Days
$0.00 $0.00 21-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 21-May-07 20-May-08
7 Months
& 11 Days
$0.00 $0.00 21-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
IC
271
Subtotal:
S15.6
S15.2
374
IC N
273
Finance Officer
S15.3 Social Mobilizer
Engineer275
S15.5 Engineer
272
EQUIP Officer270
S15.4
N
Social Mobilizer
Sayed Abdullah
N
masoodN/A
Mohammad Hussain
IC
N/A
N/A
S15.1
Baghlan Province
N
N
N/A
Abudl Rauf
N/A
Mohammad Afzal
IC
IC
IC
Ennayatullah
N
N/A
Rashid Sharif
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 21-May-07 20-May-08
7 Months
& 11 Days
$0.00 $0.00 21-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$81,420.00 $81,420.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$13,380.00 $13,380.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$10,260.00 $10,260.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08 Khalilullah
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
IC
IC
IC
IC
Obaidullah
Ehsanullah
Subtotal:
282
277
S15.7276
EQUIP Officer
Social Mobilizer
N/A
Mohammad Haroon
IC
N/A
S16.1
Herat Province
Engineer
Mohammad Aref
N/A
N
N
N/A
N
S16.5281
Finance Officer
S16.4 Social Mobilizer280
S16.2
279
278
Engineer
S16.6 Engineer
N
Muhammad Ehsan
Abdul Jabar
N
Abdullah
Abdul Qadeer
IC
S16.3
N/A
N/A
N/A
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$68,472.00 $68,472.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$15,984.00 $15,984.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09 N/A
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08 Zabiullah Saidy
12 $0.00 $0.00 01-Jan-09 31-Dec-09Sayed
Mohammad Taqi
IC N
Sardar Mohammad
IC
Mohd. Barat
IC
IC
Ehsanullah
NIC
Ahmad Khalid
N/A
N/A
Mohammad Homayon
Persarlai Kakar
Mohammad Zaher
287
288
N/A
Hameed N/A
Subtotal:
Farah Province
283
S17.5
Social Mobilizer
Finance Officer
285
S17.1
S17.3
284
286
N
N
IC
S17.6 Engineer
S17.2
EQUIP Officer
S17.4 Social Mobilizer
Engineer
N
N/A
N/A
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$100,092.00 $100,092.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S18.2 FinaICe Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08 Haroun Aseem
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
9 $0.00 $0.00 01-Apr-09 31-Dec-09 N/A
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
9 $0.00 $0.00 01-Apr-09 31-Dec-09 Abdul Hadi N/A
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$62,400.00 $62,400.00
10 Months
& 8 Days
$0.00 $0.00 21-Feb-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $14,196.00 $14,196.00 IC N 01-Apr-10 31-Mar-11 Abdul Momin
Shifted from EQUIP 1
12 $0.00 $0.00 27-Oct-07 26-Oct-08 N/A
12 $0.00 $0.00 27-Oct-08 26-Oct-09
N N/AMohamma
Musa
N/AShir
Mohammad
IC
Social Mobilizer
Engineer
Engineer
N/AMohibullah
S18.5
290
292
289 S18.1
Nimroz Province
IC
291 S18.4
293
294
N
EQUIP Officer
IC
IC
Sultan Rohani N/A
Sayed Ismail
N
Engineer
Subtotal:
Subtotal:
EQUIP Officer
S18.6
S19.1
S18.3 Social Mobilizer
Badghis Province
NIC
N/A
Arash N/A
N
Abdul Karim
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
5 Months
& 3 days
$0.00 $0.00 27-Oct-09 31-Mar-10
12 $11,520.00 $11,520.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
16 Month & 10 Days
$0.00 $0.00 20-Aug-07 31-Dec-08 Mohammad Din Fahim
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08Mohammad
Sadiq
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$84,492.00 $84,492.00
10 Months
& 8 Days
$0.00 $0.00 21-Feb-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
11 $13,200.00 $0.00 01-May-10 31-Mar-11 vacant
15 Months
& 11 Days
$0.00 $0.00 1-Dec-07 30-Nov-08
12 $0.00 $0.00 1-Dec-08 30-Nov-09
S20.1
Habiul Rahman
N
Nasrullah
N
Rahmatgull
N
Shireen N/A
N
Ahmad Shakir Ahmadzai
N/A
N N/A
Sayad Fawad
N/A
Finance Officer
298
296
297
295
299
300
IC
S19.5
S19.4
S19.2
IC
IC
Social Mobilizer
N/A
IC N
Subtotal:
S19.6 Engineer
Engineer
IC
IC
EQUIP Officer
N/A
NIC Faiz Mohammad Mayar
S19.3 Social Mobilizer
Ghor Province
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
16 Months
& 20 Days
$0.00 $0.00 10-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
11 $0.00 $0.00 01-May-10 30-Apr-11 vacant
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 N 01-Jan-09 31-Dec-09 Gul Ahmad N/A
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$60,396.00 $47,196.00
17 $0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 5-Apr-09 4-Apr-10 N/A
$0.00 $0.00
12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 10 Days
$0.00 $0.00 20-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10S21.3
302
301
307
302
303
306
304
305
S20.2 FinaICe Officer Ezatullah Nabil
N
N
Social Mobilizer
IC
N
Haji Najibullah
N/A
S20.3
S20.5
Najeeb-e- Rahman N/A
S20.4 Social Mobilizer
IC
Engineer
N/A
Hakim Khan
IC
Raaz Mohd. Fadai N/A
N/A
IC N
N/A
Mohammad Rahim
S21.1 EQUIP Officer
N
S21.2 Finance Officer
Hamayon
IC
Ghazni Province
S20.6
IC
EngineerSayed Ghaws
Social Mobilizer
IC
Rafiullah
N
Subtotal:
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 23-Oct-07 22-Oct-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$73,764.00 $73,764.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S22.2 FinaICe Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09 Ahmad Jawed N/A
Ghulam Rabani
N
Abdul Qudous Social Mobilizer
IC
IC
S21.4
S21.5 Engineer
IC
Social Mobilizer N/A
N/A
Aziz Ahmad
N
308
310
313
312
311
309
Engineer Mubarak Shah
IC N
N/A
IC
Subtotal:
S21.6
S22.4 N/A
N
N/A
IC N
Noor Mohammad
Social Mobilizer
N/A
Dr. Attiullah Alokozai
S22.1 EQUIP Officer
N
Abdul Ghani
Bamyan Province
S22.3
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$61,764.00 $61,764.00
12 $0.00 $0.00 IC N 21-Mar-09 20-Mar-10 vacant N/A
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S23.2 FinaICe Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08 Abdul Matin
12 $0.00 $0.00 01-Jan-09 31-Dec-09Sayed Ahmad
Reza
3 Months
$0.00 $0.00 IC N 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08 Nasrat Agha
12 $0.00 $0.00 01-Jan-09 31-Dec-09Mohammad
Haroon
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
S23.6
N/A
N N/A
N
Mohammad Osman
N
S23.5 Engineer
IC
S23.3 Social Mobilizer
Engineer
IC
Akbar Stanikzai
N
Habibullah Rasuly
EQUIP OfficerAmanullah
Mohammad Osman
319
316
320
314
315
317
318
IC N
Esmatullah
N
Sayed Mustafa
IC
N/A
S23.1
S22.5
N/A
S23.4 Social Mobilizer
IC
N/A
S22.6 Engineer
IC
Engineer
N/A
Ahmad Jawed
Logar Province
Subtotal:
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$61,764.00 $61,764.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08 Ezatullah Mudaqiq
9 Months
& 22 Days
$0.00 $0.00 10-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$14,196.00 $14,196.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S24.2 Finance Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,892.00 $11,892.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$61,764.00 $61,764.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
IC
Engineer
IC
Subtotal:
EQUIP Officer
S24.5
N
Nangarhar Province
N
Samiullah N/A
S24.6 Engineer
Mohammad Wali AziziN/A
Hashmatullah
N
N/A
N/A
Haji Assadullah
Zemarak Sardari
N
S24.4
IC
S24.3 Social Mobilizer
IC
Social Mobilizer
S24.1 EQUIP Officer
IC
Akbar Stanikzai
323
326
322
324
325
321
Maidan Wardak Province
Subtotal:
N/A
N N/A
S25.1
IC N
Ali Ahmad Barakzai
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$13,380.00 $13,380.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$10,260.00 $10,260.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
11 $9,680.00 $0.00 01-May-10 30-Apr-11 vacant
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 Months
$0.00 $0.00 01-Jan-10 31-Mar-10
11 $9,680.00 $0.00 01-May-10 30-Apr-11 vacant
$65,416.00 $46,056.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$13,380.00 $13,380.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S26.2 FinaICe Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
N
N
IC
Laghman Province
N/A
IC
330
332
333
334
331
329
328
327 N/A
N/A
Zundai Hafizi N/A
N
Enayatullah
IC
S25.2 FinaICe Officer
S25.3 Social Mobilizer
N
Abdul Haseeb
IC
Mohammad Hassan
N
Social Mobilizer
IC
S25.4
S25.5 Engineer
S25.6 Engineer
IC
N/A
N/A
N
Salih Mohammad
N
Fazil Hadi
Subtotal:
S26.1 EQUIP Officer
N/ARahimullah Alimi
N
Mohammad Nasir Alukozai N/AS26.3 Social Mobilizer
IC
S26.4 Social Mobilizer
IC
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,208.00 $11,208.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$58,212.00 $58,212.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08 Ghulmullah
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $14,400.00 $14,400.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S27.2 FinaICe Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08 Gul Agha
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$62,400.00 $62,400.00
16 $0.00 $0.00 01-Sep-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
Subtotal:
EQUIP Officer
IC
IC N
Mohammad Nabi
S28.1
IC
N
S27.6 Engineer
Zewar shah
N
Sayed Habibullah Pacha
Parwan Province
N/A
N/A
S27.3
N/A
Mohammad Hashim
S27.5 Engineer
IC
Social Mobilizer
S27.4 Social Mobilizer
IC
IC
S27.1 EQUIP Officer
Subtotal:
S26.6
N/A
IC N
N/AGhazi
Mohammad Ashraf
N
S26.5 N/AEngineer
340
341
342
337
335
336
339
338
334 N/ARahimullah Alimi
N
N/A
Engineer
Kunar Province
IC N
N/A
Amanullah
N
Haji Yaar Mullah khan
S26.4 Social Mobilizer
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S28.2 Finance Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$58,212.00 $58,212.00
16 Months
& 17 Days
$0.00 $0.00 13-Aug-07 31-Dec-08 Zabiullah Saidy
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 24-Nov-07 23-Nov-08
12 $0.00 $0.00 24-Nov-08 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08 Amina Naeemi
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
IC
N/A
S29.4 Social Mobilizer
N
N/A
Mohammad Zareef N/A
EQUIP Officer
N
IC
S28.1 Sayed Habibullah Pacha
Subtotal:
Social Mobilizer
347
349
342
343
350
345
346
348
344
N/A
N/A
N
Abdul Hadi N/A
N
S28.3 Social Mobilizer
IC
S28.4
S28.5 Engineer
IC
Mohammad Osman
Mohammad Younis
S28.6 Engineer
IC
N/A
Kapisa Province
N
IC
N/A
S29.3 Social Mobilizer
IC
Finance OfficerS29.2
Abdul Qahir
N
Najib ur Rahman
N
N/AAhmad Ali
N
S29.1
IC
EQUIP Officer
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$69,732.00 $69,732.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 29-Nov-07 28-Nov-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$11,520.00 $11,520.00
01-Apr-10 31-Mar-11 salim
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
N
IC
Engineer
N/A
Subtotal:
Social Mobilizer
IC
Shirpoor
Sebghatullah
Mohammad Nasir
Mohd. Esa
N/A
N/A
N/A
N/A
S29.4 Social Mobilizer
N/A
N/A
Abdul Qayoum
351
352
353
358
355
357
350
354
356
Abudl Zaher
N
N/A
N
Abdul Rahman
N
EQUIP Officer
IC
S29.6 Engineer
IC
S29.5
IC
Engineer
IC
Sayed Qasim Social Mobilizer
IC
Zekaria
Panjshir Province
S30.1
NIC
N
S30.3
N
N
S30.4
FinaICe Officer
Engineer
S30.6
S30.5
S30.2
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$69,732.00 $69,732.00
359 S31.1 EQUIP Officer 12 $14,400.00 $0.00 IC N 01-Apr-10 31-Mar-11 vacant N/A
S31.2 FinaICe Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
11 $9,680.00 $9,680.00 01-May-10 30-Apr-11 vacant
$57,704.00 $43,304.00
17 Months
$0.00 $0.00 01-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $9,600.00 $9,600.00 01-Apr-10 31-Mar-11 Farhad Haidari
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
IC
S32.3366
Engineer
S32.4 Social Mobilizer
S32.5
NIC
Mirwais
N/AHaji Shahbaz
N/A
Lal Gul
N/A
N/A
IC
IC
IC
Abdullah
Samangan Province
N
N
N
S32.2
N/A
N
N/A
N/A
Mohammad Hussain
368
365
361
362
367
364
363
360
Horia
S32.1 EQUIP Officer
Social Mobilizer
Abdul Azim
IC
Finance Officer
S31.6 Engineer
S31.4
Subtotal:
N Farid AhmadIC
N
Social Mobilizer
N/A
S31.3 Social Mobilizer
Subtotal:
S31.5 Engineer
Hekmatullah
IC
Kunduz Province
N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08Basir
Mohammad
7 Months
& 5 Days
$0.00 $0.00 27-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10Sardar
Mohammad
10 $0.00 $0.00 01-Jun-10 30-Apr-11 vacantshifted from equip1
$56,604.00 $56,604.00
12 $0.00 $0.00 20-Sep-07 19-Sep-08 Mohammad Ayoub
7 Months
& 15 Days
$0.00 $0.00 17-May-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
S33.2 Finance Officer
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08 vacant N/A
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
9 $0.00 $0.00 IC N 01-Apr-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Vacant N/A
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09 Abdul Latif
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$0.00 $0.00
$58,212.00 $58,212.00
15 Months
& 11 Days
$0.00 $0.00 IC N 20-Sep-07 31-Dec-08
12 $0.00 $0.00 16-July-o7 15-Jul-08
EQUIP Officer
Social Mobilizer
S34.1
369
N
Engineer
S33.6
Engineer
IC
Engineer
Abdul Hadi Atefi
370
371
IC
IC
IC
N/A
IC N
N/AMohammad Rasoul
Bahawoodin
373
375
372
374
Subtotal:
N/A
N
Subtotal:
EQUIP Officer
N
S32.6 Engineer
Balkh Province
N/A
IC
S33.3
S33.1
S33.4 Social Mobilizer
N
Faryab Province
Hamidullah
S33.5
N/A
Abdul Bashir
N
Nasrullah
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 01-Jan-09 31-Dec-09
11 $13,200.00 $0.00 1-May-10 31-Mar-11 vacant
S34.2 Finance Officer 12 $0.00 $0.00 16-July-o7 15-Jul-08 vacant N/A
12 $0.00 $0.00 01-Jan-09 31-Dec-09 Hedaytullah
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 IC N 16-July-o7 15-Jul-08
12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10Esmatullah/ Mir
AsdullahN/A
9 $0.00 $0.00 01-Apr-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Bashir Ahmad N/A
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,892.00 $11,892.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$60,876.00 $47,676.00
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
15 Months
& 11 Days
$0.00 $0.00 20-Sep-07 31-Dec-08
12 $13,380.00 $13,380.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10 N/A
129600 9600 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 4-Aug-07 03-Aug-08
12 $0.00 $0.00 4-Aug-08 03-Aug-09
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
381 Finance OfficerS35.2
Syed Ahamad raza
Haji Omar
Subtotal:
Ghulam Ishan
N/A
IC
Social MobilizerS34.3
Abdul Karim
abdul hafiz
N/A
IC
N/A
IC
N/A
NIC
377
378
380
376
S35.1
S35.4 Social Mobilizer
Social Mobilizer
Engineer
S34.5
EQUIP Officer
Engineer
S35.3 Social Mobilizer
383
382
IC
IC
NIC
N
N/A
N/A
N
Abdul Malik
Esmatullah
Muhammad Barat
IC
S34.4 Sayed Habib Saeed
N
N
N
379 S34.6
Juzjan Province
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
9 months
$0.00 $0.00 1-Apr-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 IC 01-Jan-10 31-Mar-10 Sayedullah N/A
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$67,812.00 $67,812.00
12 $0.00 $0.00 31-Aug-07 30-Aug-08
12 $0.00 $0.00 31-Aug-08 30-Aug-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 5-Dec-07 4-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
11 $10,000.00 $0.00 01-Jun-10 31-Mar-11 vacant
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 4-Aug-07 03-Aug-08
12 $0.00 $0.00 4-Aug-08 03-Aug-09
12 $11,208.00 $11,208.00 01-Apr-10 01-Apr-10
Shifted from EQUIP 1
12 $0.00 $0.00 4-Aug-07 03-Aug-08
12 $0.00 $0.00 4-Aug-08 03-Aug-09
12 $0.00 $0.00 4-Aug-09 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $0.00 $0.00 4-Aug-09 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$66,040.00 $56,040.00
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Dr. Shekib
12 $0.00 $0.00 IC N 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$13,380.00 $13,380.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
EQUIP Officer
N
N/A
N/A
N
N/A
Sayed Nasir
385
384
387
386
388
Social Mobilizer
IC
S36.2 Finance Officer
S35.6
N/A
Abdul Baheer
392
390
S37.1 EQUIP Officer
S36.6 Engineer
IC
Takhar Province
N/A
Subtotal:
Zabiullah
Social Mobilizer
EngineerS36.5
N
S36.4
S36.3
389
391
NIC
IC
IC
IC
N
N
IC
N/A
N/A
N/A
Samar Gul
Khwaja Asadullah
Mohammad Raqib
Saripul Province
Engineer
S35.5 Engineer
Subtotal:
S36.1
Bashir Ahmad
Mohd. Saber
N
Aziz
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $10,260.00 $10,260.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Rahila
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10
14 Months
& 25 Days
$0.00 $0.00 7-Oct-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Khyberullah
13 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $11,208.00 $11,208.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
$68,472.00 $68,472.00
S38.1 ICT Officer for Kart-e-Char office12 $0.00 $0.00 07-Nov-08 31-Dec-09 vacant N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $7,200.00 $7,200.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 07-Nov-07 06-Nov-08
12 $0.00 $0.00 07-Nov-08 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $7,200.00 $7,200.00 01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Feb-07 31-Jan-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10 s
12
$23,556.00 $23,556.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
15 $0.00 $0.00 IC N 01-Oct-07 31-Dec-08
$0.00 $0.00
12 $0.00 $0.00 26-Apr-07 27-Apr-08 Vacant
8 Months
& 3 Days
$0.00 $0.00 28-Apr-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
N/A
N/A
N/A
Engineer
N
399
400
N
N
Ahmad Salim
N
N
394
396 S37.5 Engineer
S37.4395 Social Mobilizer
Sayed Abid
IC
S37.3 Social Mobilizer
IC
Haroon Asim
IC
S37.2 Finance Officer393
398
Subtotal:
ICT MANAGEMENT UNIT TEAM
N/AZabiullah 397 S37.6
S38.2 Technician for Simultaneous & Video conferencing equipment Ahmad Jaweed N/A
IC N
N/A
IC N
N/AShamshad Ayoubi
Ahmad Zia
Ahmad Shah
IC
Technician for Simultaneous & Video conferencing equipment
IC
Web Developing Officer
401
S38.3
S38.4
S38.5 Programming Officer
Amir Mohd
N/A
IC N
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$21,216.00 $21,216.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Mar-07 28-Feb-08
8 Months
& 16 Days
$0.00 $0.00 15-Apr-08 31-Dec-08
12 $0.00 $0.00 30-May-09 29-May-10
10 $8,055.00 $8,055.00 30-May-10 31-Mar-11
Shifted from EQUIP 1
7 Months
& 7 Days
$0.00 $0.00 01-Apr-07 07-Nov-07
12 $0.00 $0.00 24-Nov-07 23-Nov-08
12 $0.00 $0.00 24-Nov-08 31-Dec-09 Abdul Wali
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$9,600.00 $9,600.00
01-Apr-10 31-Apr-11
Shifted from EQUIP 1
12 $0.00 $0.00 01-Apr-07 31-Mar-08
8 Months
& 8 Days
$0.00 $0.00 23-Apr-08 31-Dec-08
12 $0.00 $0.00 30-May-09 29-May-10Mohammad
Akbar
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$9,600.00 $9,600.00
01-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 17-Mar-07 16-Mar-08
9 Months
& 15 Days
$0.00 $0.00 17-Mar-08 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08
12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08
11 $9,119.00 $0.00 01-Jun-10 30-Apr-11 vacant
S38.11 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.12 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.13 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.14 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.15 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.16 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.17 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.18 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.19 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.20 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.21 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.22 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.23 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.24 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.25 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.26 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.27 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.28 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.29 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.30 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.31 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.32 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.33 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.34 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
N
S38.10 Help Desk Officer/Assistant (@$9600 per year)
IC
405
Network Officer
IC
Help Desk Officer/Assistant (@$9600 per year)
S38.7
IC
Help Desk Officer/Assistant (@$9600 per year)
N
N
403
404
N/A
Musadiq
N/A
Hedayatullah Hamdard
Shakir habibyar
Ahmad Shah Wardak
402 S38.6
406
S38.9
Imranulhaq
S38.8 Help Desk Officer/Assistant (@$9600 per year)
N/AMansoor Ahmad
N/A
Mohammad Akbar
N/AMohammad Shafi
IC N
Hedayat ullah Hamdard
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
S38.35 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.36 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.37 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.38 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.39 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.40 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.41 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.42 Provincial IT Officers 12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S38.43 Provincial IT Officers 4 $0.00 $0.00 IC N 01-Feb-08 30-Jun-08 Vacant N/A
S38.44 Provincial IT Officers 17
Months$0.00 $0.00 Vacant N/A
S38.45 IT Project Design Advisor - International- $0.00 $0.00 - - - - N/A
$95,546.00 $86,427.00
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
15 $0.00 $0.00 IC N 1-Oct-07 31-Dec-08
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $14,400.00 $14,400.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
408 S40.2 Finance Officer 12 $0.00 $0.00 01-Jan-09 31-Dec-09 Vacant N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
17 $0.00 $0.00 1-Aug-07 31-Dec-08
12 $0.00 $0.00 01-Jan-09 31-Dec-09
12 $12,000.00 $12,000.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $0.00 $0.00 01-Jan-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
9 $0.00 $0.00 01-Apr-09 31-Dec-09Mohammad
Akbar Stanekzai
N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 1-Apr-10 31-Mar-11
Shifted from EQUIP 1
5 $0.00 $0.00 01-Aug-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
$62,400.00 $62,400.00
2 $0.00 $0.00 IC N 01-Sep-06 30-Oct-06
12 $0.00 $0.00 01-Oct-06 30-Sep-07
S39.2 Procurement Officer 14 $0.00 $0.00 01-Nov-07 31-Dec-08 Hamidullah N/A
11 Months
& 30 Days
$0.00 $0.00 02-Jan-08 31-Dec-08
12 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08
2 $0.00 $0.00 IC N 01-Sep-06 30-Oct-06 Mansoor
S39.3 Finance Officer 12 $0.00 $0.00 01-May-07 30-Apr-08Habibullah
HabibN/A
S39.4 Admin Officer 8 $0.00 $0.00 01-May-08 31-Dec-08 Redwan N/A
12 $0.00 $0.00 IC Y 01-Mar-07 28-Feb-08
12 $0.00 $0.00 IC N 01-Sep-06 31-Aug-07
S39.6 Technical Advisor @ US$58,500/yr each7 $0.00 $0.00 IC N 01-Sep-06 31-Mar-07 Vacant N/A
S39.5
S40.5 Engineer
S40.4 Social Mobilizer
S40.1407 N/AEQUIP Officer
Paktia Province
411
410
Social Mobilizer409 N/A
IC N
N/A
IC N
Mohammad Din
Asem Jan
Teacher Education Program
IC N
Ziaullah HashmiN/A
Subtotal:
IC N
Shafaq Ikhlas
S39.2
Abdul Haq Rahmaty
N/AS39.1 Program coordinator
Ahmad Samim N/A
IC N
IT IICharge Officer
Procurement Officer
412
Subtotal
S40.6 Egineer
Shamsulhaq
N/A
Faizanullah Patan
Mohammad Sardar
S40.3
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
S39.7 Core Trainers @US$4200/yr each forTraining section & Supervision/evaluation section7 $0.00 $0.00 01-Sep-06 31-Mar-0715 filled & 26
Vacant N/A
S39.9 Computer Operator 12 $0.00 $0.00 25-Apr-07 24-Apr-08 Rohullah N/A
8 Months
& 6 Days
$0.00 $0.00 25-Apr-08 31-Dec-08 Hameed
12 $0.00 $0.00 01-Jan-09 31-Dec-09
5 $0.00 $0.00 01-Nov-06 31-Mar-07
12 $0.00 $0.00 25-Apr-07 24-Apr-08
8 Months
& 6 Days
$0.00 $0.00 25-Apr-08 31-Dec-08 Asifullah
7 $0.00 $0.00 IC N 01-Sep-06 31-Mar-07
23 $0.00 $0.00 01-Feb-07 31-Dec-08
S39.12 Office Assistant - TED 12 $0.00 $0.00 01-Jan-09 31-Dec-09 Mohabat N/A
15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08
15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08
S39.14 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.15 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.16 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.17 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.18 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.19 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.20 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.21 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.22 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.23 English Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.24 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.25 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.26 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.27 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.28 Computer Instructors for ILE&C15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.29 Supervisor for ILE&C 15 $0.00 $0.00 IC N 01-Feb-07 31-Jan-08 Vacant N/A
S39.30 Supervisor for ILE&C 3 $0.00 $0.00 IC N 01-Feb-07 30-Apr-07 Vacant N/A
S39.31 Supervisor for ILE&C 3 $0.00 $0.00 IC Y 01-Feb-07 30-Apr-07 Vacant N/A
S39.32 Core Trainers ( 22 Staff Members) @US$250/month for AITE - 1 semester3 $0.00 $0.00 IC N 01-Feb-07 30-Apr-07 Vacant N/A
S39.33 Trainers (200 Staff Members) @US$120/month for AITE - 1 semester$0.00 $0.00 Vacant N/A
S39.34 Admin. Staff (44 Staff Members) for AITE @US$120/month - 1 semester$0.00 $0.00 Vacant N/A
$0.00 $0.00
12 $0.00 $0.00 10-Dec-07 9-Dec-08
$0.00 $0.00 10-Dec-08 28-Feb-09
12 $0.00 $0.00 10-Dec-07 9-Dec-08
2 $0.00 $0.00 10-Dec-08 28-Feb-09
CS41.3 Advisor Curriculum Development-Mathematics12 $0.00 $0.00 SSS Y 15-Dec-07 14-Dec-08Mr. Nangyalai
ArsalaN/A
12 $0.00 $0.00 17-Jan-08 30-Dec-08Ghulam Faruq
Khapulwak
5 $0.00 $0.00 1-Mar-09 31-Jul-09Extension dropped
12 $0.00 $0.00 10-Dec-07 9-Dec-08
10 $0.00 $0.00 1-Mar-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$18,000.00 $18,000.00
1-Mar-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Feb-08 30-Dec-08
2 $0.00 $0.00 10-Dec-08 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09
12 $0.00 $0.00 5-Mar-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 10-Dec-07 9-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS41.2 Snr. Subject Specialist-Mathematics
CS41.5
CS41.7
Evaluation officer for TEDS39.13
CS41.1 Snr. Subject Specialist-Mathematics
General Education
Subtotal:
N/AAbdul Nabi
Wahidi
CS41.4 Snr. Subject Specialist-Environmental Science
S39.11 Computer Operator
S39.10 Computer Operator
N
IC
Abdullah
IC N
Nasratullah
IC
N
N/AHamidi
N/A
N/A
NIC
N/A
N/AIC N
CS41.8
Snr. Subject Specialist-Chemistry N
Advisor Curriculum Development-Chemistry
IC
413
IC N
Hussain Ali Ramozi
CS41.6
N/A
NMohd Hassan
Nazar Mohammad
HalimIC
N/A
N/A
N N/A
Snr. Subject Specialist-Physics IC
IC Mohd Qasim Jamdar
N
Advisor Curriculum Development-Physics
Gul Ahmad Saghari
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
10 $0.00 $0.00 1-Mar-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
CS41.9 Snr. Subject Specialist-Biology 12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08Hayatullah
NaserN/A
12 $0.00 $0.00 15-Dec-07 14-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$15,600.00 $15,600.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 15-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$21,600.00 $21,600.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 15-Dec-07 14-Dec-08
$0.00 $0.00 15-Dec-08 28-Feb-09
10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $0.00 $0.00 15-Dec-07 14-Dec-08
$0.00 $0.00 15-Dec-08 28-Feb-09
10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS41.14 Snr. Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A
12 $0.00 $0.00 39515 39812
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$24,000.00 $24,000.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 20-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$21,600.00 $21,600.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 31-Jan-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 15-Dec-07 14-Dec-08
2 months 15 days
$0.00 $0.00 15-Dec-08 28-Feb-09
10 $0.00 $0.00 IC N 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$15,000.00 $15,000.00
1-Apr-10 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 1-Feb-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS41.20 Snr. Subject Specialist-Baloochi Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A
416
IC
Snr. Subject Specialist-Pashtu Literature IC
IC
Shafiqa Yarqin
IC N/AN
CS41.17
Snr. Subject Specialist-Pashtu Literature
CS41.19 Snr. Subject Specialist-Turkmani Literature
420 CS41.18 Snr. Subject Specialist-Uzbaki Literature
Snr. Subject Specialist-Pashtu Literature
419
417
418 CS41.16
Snr. Subject Specialist-Dari Literature
CS41.15
Snr. Subject Specialist-Dari Literature
Snr. Subject Specialist-Pashtu Literature
IC
CS41.12 Snr. Subject Specialist-Civil Information
415 CS41.11 Snr. Subject Specialist-Geography
IC
IC
IC
IC
Snr. Subject Specialist-Dari Literature
414 CS41.10 Snr. Subject Specialist-History
CS41.13
CS41.8 Advisor Curriculum Development-Chemistry
N
N N/A
Salimi
N/A
Hamidullah Weda
N/A
Ghulam Farooq Ansari
N/A
Ghulam Jilani Aarez
N
Baryalay Bajauray
N/A
N
N/A
N/A
N
Aziz Bakhtiari
Abdul Sabor Fakhri
Mohd Qasim Heelaman
N
Asaadullah Muhaqqique
N
N/ANAbdul Karim
Nazar
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 3-Mar-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS41.22 Snr. Subject Specialist-Nooristani Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A
12 $0.00 $0.00 17-Jan-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 20-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
Snr. Subject Specialist-Arabi Literature10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
CS41.25 Snr. Subject Specialist-English Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A
CS41.26 Snr. Subject Specialist-English Literature12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Vacant N/A
12 $0.00 $0.00 16-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $0.00 $0.00 17-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
Snr. Subject Specialist-Islamic Education 10 $0.00 $0.00 01-Mar-09 31-Dec-09 Dropped
Snr. Subject Specialist-Arts & Culture $0.00 $0.00 IC N 15-Dec-08 28-Feb-09Sayeed Abdullah Framarz
N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Vacant,Amount reduced
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$13,500.00 $13,500.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 01-Mar-09 31-Dec-09
$0.00 $0.00 10-Dec-08 28-Feb-09
CS41.30 Snr. Subject Specialist-Computer10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Rasuol Zahir
Snr. Subject Specialist-Computer12 $0.00 $0.00 IC N 15-Dec-08 28-Feb-09 N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$21,600.00 $21,600.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
$186,900.00 $186,900.00
12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08Mohammad
MuzamelN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Snr. Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 16-Dec-07 15-Dec-08 N/A
$0.00 $0.00 15-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
Snr. Subject Specialis-Arabic Language12 $0.00 $0.00 IC N 39467 39812 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$19,200.00 $19,200.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 17-Jan-08
39812
Ezatullah N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N39469 39812
Sher Ali Zarifi N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Saduddin Shpoon
CS41.30 Advisor Curriculum Development-Art & Culture IC
424
Subtotal:
423
CS41.29
Snr. Subject Specialist-Arts & Culture
422
CS42.4
CS41.28Snr. Subject Specialist-Islamic Education
CS41.24Snr. Subject Specialist-Arabi Literature
CS41.27
Snr. Subject Specialist-Islamic Education
Snr. Subject Specialist-Islamic Education
Snr. Subject Specialis-Arabic LanguageCS42.5
CS41.31
Center for Excellence
Snr. Subject Specialis-Quran Majid
Snr. Subject Specialist-Computer
CS42.2
CS42.1
Enayatullah Khalil
421 CS41.21
Snr. Subject Specialist-Pashayee Literature
Snr. Subject Specialist-Pashayee Literature
ICCS41.23 Snr. Subject Specialist-Pmiri Literature
N/AIC
CS42.6
N/ANKhair
Mohammad
N
Hafiza Rahimi
N/A
N
Taj Mohammd Wahidyar
IC
N/A
N/A
Abdul Hameed Aatif
IC
N/AN
IC
Abdul Hai Moqim
N
Ehsanullah
NAbdul Wahab
Mohammad Amin Waqaad
Snr. Subject Specialis-Arabic Language
Snr. Subject Specialis-Hadis Sharif
Snr. Subject Specialis-Sirat Nabi
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
Snr. Subject Specialis-Feqa12 $0.00 $0.00 IC N 16-Dec-07 15-Dec-08 N/A
$0.00 $0.00 16-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 N/A
$0.00 $0.00 15-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$18,000.00 $18,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 29-Mar-08 30-Dec-08Mohammad Zaki Ehsani
N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Snr. Subject Specialis-Pedagogy & Psychology12 $0.00 $0.00 IC N 16-Dec-07 15-Dec-08 N/A
$0.00 $0.00 16-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 39511 39812 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$21,600.00 $21,600.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 25-Feb-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Snr. Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 Shafiq Samim N/A
$0.00 $0.00 15-Dec-08 28-Feb-09
Snr. Subject Specialis-Usool Faq10 $0.00 $0.00 01-Mar-09 31-Dec-09 vacant N/A
Snr. Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 21-Feb-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Snr. Subject Specialis-Aqayed & Adyan10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
Snr. Subject Specialis-Feqa12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
Snr. Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 15-Dec-07 14-Dec-08 N/A
$0.00 $0.00 15-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
9 days $0.00 $0.00 1-Jan-10 09-Jan-10
3 $0.00 $0.00 10-Jan-00 31-Mar-10
12
$42,000.00 $42,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
Mohammad Yousuf Niazi
Shair Ali Zarifi
Snr. Subject Specialis-Feqa
CS42.14
CS42.17
Snr. Subject Specialis-Usool Feqa
CS42.15
Snr. Subject Specialis-Feqa
430
CS42.16
CS42.12 Snr. Subject Specialis-Hadis Sharif
428 CS42.11
CS42.7
Snr. Subject Specialis-Hadis Sharif
Snr. Subject Specialis-Pedagogy & Psychology
427
CS42.9
CS42.8
CS42.10
426
429
CS42.13
Snr. Subject Specialis-Usool Feqa
Snr. Subject Specialis-Feqa
425Sayed Abdul
Wahab Rahmani
Mohammad Baqir Jafari
Nematullah Mahmoodi
Assadullah Hanif
Mohammad Jawad Salihi
Shah Wali Allah Adeb
Ghulamudin Kalantari
Abdul Hamid Mohammadi
Snr. Subject Specialis-Usool Feqa
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
Snr. Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Khalilurahman
HenaniN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
CS42.19 Snr. Subject Specialis-Arabic Language10 $0.00 $0.00 01-Mar-09 31-Dec-09 Deleted.
CS42.20 Snr. Subject Specialis-Arabic Language10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant
10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant
7 $0.00 $0.00 01-Jul-09 29-Jan-10 Wali
3 $0.00 $0.00 01-Feb-10 31-Mar-10
12 $18,000.00 $18,000.00 1-Apr_10‘ 31-Mar-11 from
10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$13,200.00 $13,200.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 01-Mar-09 31-Dec-09 Vacant
3 $0.00 $0.00 1-Jan-10 31-Mar-10 Khan Shireen
CS42.24 Snr. Subject Specialis-Pedagogy & Psychology10 $0.00 $0.00 01-Mar-09 31-Dec-09 Deleted.
CS42.25 Specialis - TVT 10 $0.00 $0.00 01-Mar-09 31-Dec-09 Deleted.
$168,000.00 $168,000.00
12 $0.00 $0.00 1-Feb-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
CS43.1Snr. Subject Specialist Human Rights
7 $0.00 $0.00 IC N 01-Mar-09 30-Sep-09Extension dropped
N/A
CS43.2 Snr. Subject Specialist Human Rights12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.3 Snr. Subject Specialist Gender12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.4 Snr. Subject Specialist Health12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.5 Snr. Subject Specialist Counter Narcotics12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.6 Snr. Subject Specialist Mine Awarness12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.7 Subject Editor (Gender) 12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.8 Subject Editor (Gender) 12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
12 $0.00 $0.00 24-Mar-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
CS43.9Subject Editor (Human Rights)
7 $0.00 $0.00 IC N 01-Mar-09 30-Sep-09Extension dropped
N/A
CS43.10 Subject Editor (Envoirnement)12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS43.11 Subject Editor (Health) 12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
12 $0.00 $0.00 3-Mar-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$18,000.00 $18,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 24-Mar-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
$18,000.00 $18,000.00
CS44.1 Sub Editor-Dari 12 $0.00 $0.00 IC Y 39539 39812 Said Faruq Farani N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor-Dari 12 $0.00 $0.00 IC Y 39539 39812 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor-Dari 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
CS44.3 Sub Editor-English 12 $0.00 $0.00 IC Y 39539 39812 Ehsan Azari N/A
$0.00 $0.00
Ahmad Yaseen Farkhari
CS43.13Subject Editor (Afghan Culture Values)
IC N
Subtotal:Senior Editor
N/A
CS44.2
Abdul Ghafoor Qarar
CS42.18
Snr. Subject Specialis-Flasafa Islamic
CS42.22 IC
Snr. Subject Specialis-English Language
Abdul Zahir Modaqiq
N
Roya Rahimi
CS42.21
432
433
Mohammad Azim Karbalai
Snr. Subject Specialis- Physics
Snr. Subject Specialis-English Language
N/A
Cross Cutting
CS43.1Snr. Subject Specialist Human Rights
IC N
Subtotal:
CS42.23
Salma
ICSubject Editor (Human Rights)
Subject Editor (Islamic Principles)
CS43.12
Subject Editor (Islamic Principles)IC
CS43.9 N N/A
N/A
Qiaumdin Kashaf
N
Abdul Wasi
431
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
Sub Editor-Histori 12 $0.00 $0.00 IC Y 39539 39812 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor-Histori 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
CS44.5 Sub Editor-Histori 12 $0.00 $0.00 IC Y 39539 39812Ghulam Ahmad
WaakN/A
$0.00 $0.00
CS44.6 Sub Editor (Mathematics) 12 $0.00 $0.00 IC Y 39539 39812Mohammad Nasir Chafie
N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC Y 39539 39812 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
9 $26,550.00 $0.00 01-Jul-10 30-Apr-11 Vacant
CS44.8 Sub Editor (Pashtu Literature)12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 Vacant N/A
$0.00 $0.00
12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
12 $0.00 $0.00 IC Y 39539 39812Eshaq
NegaargarN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS44.11 Sub Editor (Pedagogy) 12 $0.00 $0.00 IC Y 13-Apr-08 30-Dec-08 Farida Akram N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor (Physics) 12 $0.00 $0.00 IC Y 39539 39812 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor (Physics) 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
CS44.13 Sub Editor (Physics) 12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 Vacant N/A
$0.00 $0.00
Sub Editor (Georgraphy) 12 $0.00 $0.00 IC Y 1-Apr-08 39812 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor (Georgraphy) 10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
CS44.15 Sub Editor (Computer) 12 $0.00 $0.00 IC Y 1-Apr-08 39812Abdul Qadir
WadanN/A
$0.00 $0.00
CS44.16 Sub Editor (Chemistry) 12 $0.00 $0.00 IC Y 1-Apr-08 39812Shawkat Ali
ShefaN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS44.17 Sub Editor (English Literature)12 $0.00 $0.00 IC Y 29-Dec-07 28-Dec-08 Vacant N/A
$0.00 $0.00
CS44.18 Sub Editor (Environment & Pedagogy)12 $0.00 $0.00 IC Y 1-Apr-08 39812 Sharifa Sharif N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor (Pashtu Literature)12 $0.00 $0.00 IC Y 15-Jul-08 31-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Sub Editor (Pashtu Literature)10 $0.00 $0.00 01-Mar-09 30-Dec-09 N/A
Language Editor-Pamiri 12 $0.00 $0.00 IC Y 1-Apr-08 39812Mohammad
SaberN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Language Editor-Pamiri 10 $0.00 $0.00 01-Mar-09 30-Apr-09Mohammad
SaberN/A
CS44.21 Subject Editor-Mathematics12 $0.00 $0.00 IC Y 39539 39812 Azizullah Aral N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
$26,550.00 $0.00
CS45.1 Snr. Technical Specialist/ Graphic Designer12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
CS45.2 Snr. Technical Specialist/ Graphic Designer12 $0.00 $0.00 IC N 17-Dec-07 16-Dec-08 Vacant N/A
$0.00 $0.00
12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 N/A
$0.00 $0.00 IC N 22-Dec-08 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
Rahmatullah Zwakman
Graphic Designer
Subtotal:Subject Specialist
CS44.14
Subtotal:
CS44.19
Mr. Mohammad Ashooq Gharib
Sub Editor (Mathematics)
CS44.4
CS44.12
CS44.7
CS44.10
Sub Editor (Pashtu Literature)
Rasul Bawari
Mohammad Zarin Anzoor
Makhan Shinwari
Telabaz Habibzai434
CS44.9
Sub Editor (Dari Literature)
CS44.20
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08
2 $0.00 $0.00 IC N 23-Dec-08 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
Subject Specialist-Mathematics12 $0.00 $0.00 IC N 39560 39812 N/A
$0.00 $0.00 IC N 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.6 Subject Specialist-Mathematics12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A
$0.00 $0.00
CS46.7 Subject Specialist-Mathematics12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A
$0.00 $0.00
CS46.8 Subject Specialist-Environmental Science12 $0.00 $0.00 IC N 29-Apr-08 30-Dec-08 Sayed Bahadur N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.9 Subject Specialist-Environmental Science12 $0.00 $0.00 IC N 11-Mar-08 30-Dec-08Hedayatullah
HedayatN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.13 Subject Specialist-Environmental Science12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A
$0.00 $0.00
CS46.14 Subject Specialist-Physics 12 $0.00 $0.00 IC N 26-Mar-08 30-Dec-08Shir
MohammadN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.15 Subject Specialist-Physics 12 $0.00 $0.00 IC N 22-Dec-07 21-Dec-08 Vacant N/A
$0.00 $0.00
CS46.16 Subject Specialist-Chemistry12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08Besmillah Wali
AhmadZaiN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 N/A
2 $0.00 $0.00 22-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
$0.00 $0.00 IC N 23-Dec-08 22-Dec-08 Abdul Qudos N/A
$0.00 $0.00
10 $0.00 $0.00 01-Mar-09 31-Dec-09 Abdul Ghafor G N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
440
435
437
438
436
439
CS46.4
CS46.17
CS46.11
CS46.10
Obaidullah Safi
Subject Specialist-MathematicsHamdullah
SherzaiCS46.2
CS46.1 Mehria
Subject Specialist-Biology
Subject Specialist-Chemistry
Subject Specialist-Environmental Science
Mohammad Anwar
Sarbuland
Sayed Mawjod Shah
12
Subject Specialist-Environmental Science
Abdul Mohammad
Aziz
Subject Specialist-Mathematics
Subject Specialist-Mathematics
CS46.19
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.21 12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.21 10 $0.00 $0.00 01-Mar-09 31-Mar-09 N/A
8.75 $0.00 $0.00 7-Apr-08 31-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $24,000.00 $24,000.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 13-Jan-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08 Vacant N/A
$0.00 $0.00
10 $0.00 $0.00 01-Mar-09 31-Dec-09Hayatullah
NasarN/A
12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08Kazimia Sadat
MohaqiqN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08 Safura Mazari N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08Kazimia Sadat
MohaqiqN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08 Safura Mazari N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.30 Subject Specialist-Civil Information12 $0.00 $0.00 IC N 23-Dec-07 22-Dec-08 Vacant N/A
$0.00 $0.00
12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $16,800.00 $16,800.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Mohammad
Nasem FaqeriN/A
$0.00 $0.00 10-Dec-08 28-Feb-09
12 $0.00 $0.00 IC N 10-Dec-07 9-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 15-Mar-08 30-Dec-08Mohd Afzal
BanuwalN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09Mohd Afzal
Banuwal
444
442
443
Subject Specialist-HistoryShah Sanam
Omari Jabarkhil
CS46.28
Hayatullah Nasar
Zalmai HottakCS46.22 Subject Specialist-History
CS46.27 Subject Specialist-Geography
Subject Specialist-Geography
Subject Specialist-Biology
441
Subject Specialist-Dari LiteratureCS46.34
Subject Specialist-Dari Literature
CS46.26
CS46.32
Subject Specialist-Dari Literature
CS46.29 Subject Specialist-Civil Information
Subject Specialist-GeographyCS46.24
CS46.25
CS46.33
CS46.31
Subject Specialist-Civil Information
Subject Specialist-Dari Literature
Mohd Faroq
Abdul Raziq Asmar
Sayed Mahmood
Khaliq
Mohammad Raziq Bahir
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
CS46.35 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 15-Mar-08 30-Dec-08Ikramuddin Hessaryan
N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.36 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 22-Apr-08 30-Dec-08Shujauddin Khorasani
N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.37 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 24-Dec-07 23-Dec-08 Vacant N/A
$0.00 $0.00
CS46.38 Subject Specialist-Dari Literature12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 Zohour Zohouri N/A
$0.00 $0.00 24-Dec-08 28-Feb-09
12 $0.00 $0.00 IC N 25-Mar-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 24-Dec-07 23-Dec-08Said Ahmad
Momand
2 $0.00 $0.00 01-Jan-09 28-Feb-09Said Ahmad
Momand
10 $0.00 $0.00 01-Mar-09 31-Dec-09 Abdul Rahim N/A
$0.00 $0.00
12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $0.00 $0.00 IC N 21-Feb-08 30-Dec-08Mohd Hakim
TaniwalN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Nematullah
AnderN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 30-Jan-08 30-Dec-08Mohd Aajan
HaqpalN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 12-Feb-08 30-Dec-08Sayed
MohaiuddinN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.46 Subject Specialist-Pashtu Literature12 $0.00 $0.00 IC N 20-Apr-08 30-Dec-08Abdul Qayum
MushwaniN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.47 Subject Specialist-Pashtu Literature12 $0.00 $0.00 IC N 24-Apr-08 30-Dec-08Mohammad Asif
SamimN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Subject Specialist-Pashtu Literature12 $0.00 $0.00 IC N 20-Apr-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Subject Specialist-Pashtu Literature10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Burhanuddin
NamiqN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Mohd Halim
YarqinN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 Hafizullah Rahiq N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Hafizullah
OufonN/A
CS46.42
CS46.52
CS46.43
CS46.49
445
CS46.44
CS46.41
CS46.39
Subject Specialist-Pashtu Literature
Subject Specialist-Pashtu Literature
Subject Specialist-Pashtu Literature
CS46.40
Subject Specialist-Pashtu Literature
Subject Specialist-Pashtu Literature
Subject Specialist-Dari Literature Farzana
Hazrat Gul Archiwal
Subject Specialist-Uzbaki LiteratureCS46.50
CS46.51 Subject Specialist-Uzbaki Literature
Subject Specialist-Turkmani Literature
Subject Specialist-Pashtu LiteratureCS46.45
CS46.48
Subject Specialist-Uzbaki Literature
Nasim Gul Totakhail
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
2 $0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.54 Subject Specialist-Turkmani Literature12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08Abdul Aziz
OmarN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS46.55 Subject Specialist-Baloochi Literature12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Ghulam Sakhi
WakilzadaN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 1-Apr-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.57 Subject Specialist-Baloochi Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08Mohammad
NadirN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.58 Subject Specialist-Pashayee Literature12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Ghulam Sediq
ShenganakN/A
$0.00 $0.00 25-Dec-08 28-Feb-09
CS46.59 Subject Specialist-Pashayee Literature12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Mohammad
Hasan HesamN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.60 Subject Specialist-Pashayee Literature12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08Mohammad
NadirN/A
$0.00 $0.00 25-Dec-08 28-Feb-09
CS46.61 Subject Specialist-Nooristani Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Khosh Nazar N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Munawar Khan N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09 Munawar Khan
10 $0.00 $0.00 01-Mar-09 31-Dec-09Khosh Nazar
PamirzadN/A
Subject Specialist-Nooristani Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Subject Specialist-Nooristani Literature10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
CS46.64 Subject Specialist-Pamiri Literature12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 Khosh Nazar N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 17-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $18,000.00 $18,000.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.65 Subject Specialist-Pamiri Literature10 $0.00 $0.00 01-Mar-09 31-Dec-09 Dropped N/A
Subject Specialist-Pamiri Literature12 $0.00 $0.00 IC N 1-Feb-08 30-Dec-08 Mir Ali N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08Abdul Habib
SamimN/A
Khair Mohammad Gumshadzi
Subject Specialist-Arabi Literature
CS46.62 Subject Specialist-Nooristani Literature
CS46.63
CS46.56 Subject Specialist-Baloochi Literature
Subject Specialist-Pamiri Literature
Mohammad Asif
Azizullah Shalmach
CS46.65
Subject Specialist-Arabi Literature
Khosh Nazar Pamirzad
CS46.67
CS46.66
CS46.68
448
447
446
449
Subject Specialist-Turkmani LiteratureCS46.53Abdul Majid
Turan
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A
$0.00 $0.00
12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A
$0.00 $0.00
CS46.71 Subject Specialist-English Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A
$0.00 $0.00
CS46.72 Subject Specialist-English Literature12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 Vacant N/A
$0.00 $0.00
CS46.73 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08Ihsanullah
MadaniN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.74 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08Seddiqullah
ReshtiaN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.75 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 Zaheeruddin N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.76 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 Enayatullah Adil N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 24-Jan-08 25-Dec-08 Aenu Naeem N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09 Aenu Naeem
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$14,400.00 $14,400.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.80 Subject Specialist-Islamic Studies12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08 Abdul Jabar N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.81 Subject Specialist-Culture & Arts12 $0.00 $0.00 IC N 16-Apr-08 31-Dec-08Ahmad Naser
SarmastN/A
CS46.82 Subject Specialist-Culture & Arts12 $0.00 $0.00 IC N 22-Apr-08 30-Dec-08Abdul Hameed
AatifN/A
$0.00 $0.00 01-Jan-09 28-Feb-09
CS46.83 Subject Specialist-Computer12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A
CS46.84 Subject Specialist-Computer12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A
12 $0.00 $0.00 IC N 18-Apr-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS46.69 Subject Specialist-English Literature
Subject Specialist-Islamic StudiesCS46.77
Subject Specialist-English Literature
451
453
452
450
CS46.85
Aenu Naeem
Subject Specialist-Sport
CS46.70
CS46.79
CS46.78 Subject Specialist-Islamic Studies
Subject Specialist-Islamic Studies
Khalilullah
Abdul Aziz Behbod
Noor u llah
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
CS46.86 Subject Specialist-Sport 12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A
12 $0.00 $0.00 IC N 26-Feb-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
CS46.88 Subject Specialist-Technical Education12 $0.00 $0.00 IC N 26-Dec-07 25-Dec-08 Vacant N/A
$260,400.00 $260,400.00
CS47.1 Subject Specialist Human Rights12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Abdul Haq N/A
CS47.2 Snr. Subject Specialist Human Rights12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Jafar Mahdawi N/A
CS47.3 Snr. Subject Specialist Gender12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Esmat Ayoubi N/A
CS47.4 Snr. Subject Specialist Gender12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A
CS47.5 Subject Specialist-Distance Education12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A
CS47.6 Snr. Subject Specialist Health Education12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A
CS47.7 Sub-Specialist-Distance Education12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A
CS47.8 Snr. Subject Specialist Mine Awarness12 $0.00 $0.00 IC N 27-Dec-07 26-Dec-08 Vacant N/A
$0.00 $0.00
CS48.1 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Vacant N/A
CS48.2 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 01-Jan-09 28-Feb-09 Vacant N/A
CS48.3 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 29-Dec-07 28-Dec-08 Vacant N/A
CS48.4 Technical Specialist/ Graphic Designe12 $0.00 $0.00 IC N 29-Dec-07 28-Dec-08 Vacant N/A
$0.00 $0.00
12 $0.00 $0.00 22-Jan-08 31-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $3,600.00 $3,600.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 22-Jan-08 31-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
12 $0.00 $0.00 22-Jan-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 vacant
12 $0.00 $0.00 22-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
12 $0.00 $0.00 22-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 22-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 22-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Mudaser Aslami N/A
N/A
N/A
N/A
N/A
N
Lieaqat Ali
Sayed Mohd Agha Hashimi
Wazir Gul Seddiqi
Graphic Designer/ Data Clerk
IC
IC N
454
Cross Cutting
Sayed Rahmat Shah
CS49.7
CS49.4
456
455
N/A
ICOmaid Mansoor
N
N
N/A
N/A
CS46.87
Subtotal:
Subject Specialist-Technical Education
Graphic Designer/ Data Clerk
Ahmad Fawad
Safatullah
NIC
Graphic Desigen
Subtotal:
CS49.1
Graphic Designer/ Data Clerk
IC
CS49.2
Graphic Designer/ Data Clerk
Graphic Designer/ Data Clerk
CS49.3IC
Graphic Designer/ Data Clerk
CS49.5
CS49.6
Subtotal:
Data Clerks
Abdul Haadi
Mohd Ashraf
Graphic Designer/ Data Clerk
N
IC
N Samen
Wazhma
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
12 $0.00 $0.00 22-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 Vacant N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Zabeeh
10 $0.00 $0.00 01-Mar-09 31-Dec-09
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 22-Jan-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 5-Apr-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
Snr.Graphic designer 9 $90,000.00 $0.00 01-Jul-10 30-Apr-11 Vacant
Shifted from EQUIP 1
12 $0.00 $0.00 5-Apr-08 30-Dec-08
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 5-Apr-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 5-Apr-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $9,600.00 $9,600.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 22-Apr-08 30-Dec-08
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 Lal Muhammad N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$4,800.00 $4,800.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 Ataullah Hatami N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 mohd Ahsan
461
Graphic Designer/ Data Clerk460
CS49.15
N
Mohd Ali
Najibullah
Graphic Designer/ Data Clerk
Mir AzamGraphic Designer/ Data ClerkCS49.17
CS49.18
IC
N/A
N/A
Hameedullah
Sultran Mahmood
N/A
Hamatullah
N/A
Suhail
Parwaiz Qarizada
N/A
N/A
Omer Abdullah
Fatima
NargisN
N
CS49.9
CS49.10
CS49.8
CS49.14
CS49.11
CS49.13
CS49.12458
457
CS49.16
459
IC
Graphic Designer/ Data Clerk
N/A
Nader Ali
Graphic Designer/ Data Clerk
Graphic Designer/ Data Clerk
IC N Khatera
Graphic Designer/ Data Clerk
N/AIC N
Hafizullah
IC
N
IC
IC
Graphic Designer/ Data Clerk
N
N
Graphic Designer/ Data Clerk
IC
Graphic Designer/ Data Clerk
Graphic Designer/ Data Clerk
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
Graphic Designer/ Data Clerk12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
$0.00 $0.00 01-Jan-10 31-Mar-10
12 $0.00 $0.00 IC N 30-Dec-07 29-Dec-08 Vacant N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $3,600.00 $3,600.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
CS49.22 Graphic Designer/ Data Clerk10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Nargis N/A
CS49.23 Graphic Designer/ Data Clerk10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 vacant N/A
10 $0.00 $0.00 IC N 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 IC N 01-Apr-09 03-Jan-10 Vacant N/A
12 $4,800.00 $4,800.00 1-Apr_10‘ 31-Mar-11 omar
Shifted from EQUIP 1
10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 vacant N/A
12 $4,800.00 $0.00 1-Apr_10‘ 31-Mar-11 Vacant
Shifted from EQUIP 1
Subtotal: $145,200.00 $50,400.00
12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08 N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
CS50.3 Subject Specialis-Quran Majid12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08Said Mohammad Aqa HashimiN/A
$0.00 $0.00 01-Jan-09 28-Feb-09Said Mohammad Aqa Hashimi
CS50.4 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 Abdul Rafea Alimi N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09 Abdul Rafea Alimi
CS50.5 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 13-Jan-08 30-Dec-08 Abdul Manan N/A
2 $0.00 $0.00 Abdul Manan
CS50.6 Subject Specialis-Aqayed, Adyan12 $0.00 $0.00 IC N 16-Jan-08 30-Dec-08 Farazulldin N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09 Farazulldin
CS50.7 Subject Specialis-Aqayed, Adyan12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 Mohammad IbrahimN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09 Mohammad Ibrahim
12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08 N/A
$0.00 $0.00 31-Dec-08 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 13-Jan-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
Center for Excellence
Subject Specialis-Quran Majid
Subject Specialis-Arabic Language
Abdul Naser Shafiq
Asadullah
CS50.1 Sayed Fazil ShahSubject Specialis-Quran Majid
CS50.8
CS50.2
Graphic Designer/ Data Clerk
Graphic Designer/ Data Clerk
465 CS49.26
CS49.21
Ahmad Zamir Graphic Designer/ Data Clerk
CS49.20
Rahmatullah
Graphic Designer/ Data Clerk
CS49.19
464
467
CS49.25
466
462
463
waheedullah
CS49.24 Graphic Designer/ Data Clerk sohail
Graphic Designer/ Data Clerk
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 01-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A
2 $0.00 $0.00 31-Dec-08 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12
$18,000.00 $18,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 20-Jan-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $18,000.00 $18,000.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
12 $0.00 $0.00 IC N 25-Dec-07 24-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $9,600.00 $9,600.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS50.14 Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 25-Feb-08 30-Dec-08 Hafizullah N/A
2 $0.00 $0.00 25-Dec-08 28-Feb-09 Hafizullah
12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
CS50.16 Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 3-Mar-08 30-Dec-08 Raqibullah N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.17 Subject Specialis-Pedagogy & Psychology12 $0.00 $0.00 IC N 15-Jan-08 30-Dec-08 Fazlullah Momand N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.18 Subject Specialis-Pedagogy & Psychology12 $0.00 $0.00 IC N 24-Jan-08 30-Dec-08Mohammad Shoaib SaiqalN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.19 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 5-Mar-08 30-Dec-08 Abdul Latif Nazari N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.20 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 25-Dec-07 31-Dec-08 Mohammd Ali Fetri N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.21 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 13-May-08 30-Dec-08 Hussain Ali Amini N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.22 Subject Specialis-Hadis Sharif12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 Vacant N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.23 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08 Zakir Hussain ErshadN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.24 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08Mohammd Ali Qadam Ali ZadaN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.25 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 4-Apr-08 30-Dec-08Mohammd Akram AarefyN/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.26 Subject Specialis-Aqayed & Adyan12 $0.00 $0.00 IC N 31-Dec-07 30-Dec-08 Vacant N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Subject Specialis-Feqa
CS50.10 Subject Specialis-Feqa
CS50.15 Pir Mohd Rohani
Habibullah FouziSubject Specialis-Feqa
CS50.13 Mohd Nasim QazizadaSubject Specialis-Usool Feqa
CS50.12
Subject Specialis-Usool Feqa
Abdul Hakim Mujahid
Subject Specialis-Feqa
Subject Specialis-Sirat Nabi Abdul Sabour
Fazulullah Niazi
CS50.9
CS50.11
468
469
470
471
472
473
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
CS50.27 Subject Specialis-Feqa 12 $0.00 $0.00 IC N 4-Mar-08 30-Dec-08 Abdul Shakor Waqif N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
CS50.28 Subject Specialis-Feqa 12 $0.00 $0.00 IC N 12-Feb-08 30-Dec-08 Hasan Rezaee N/A
$0.00 $0.00 01-Jan-09 28-Feb-09
Subject Specialis-Feqa 12 $0.00 $0.00 IC N 12-Feb-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A
3 $0.00 $0.00 1-Jan-10 31-Mar-10
CS50.31 Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 1-May-08 30-Dec-08 Khadija Muradi N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09 Khadija Muradi
Subject Specialis-Usool Feqa12 $0.00 $0.00 IC N 18-Mar-08 30-Dec-08 N/A
2 $0.00 $0.00 01-Jan-09 28-Feb-09
Subject Specialis-Usool Feqa10 $0.00 $0.00 1-Mar-09 31-Dec-09 N/A
$105,600.00 $105,600.00
CS51.1 Subject Editor-History 5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A
$0.00 $0.00
CS52.1 Subject Editor-Uzbaki Language5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A
CS52.2 Subject Editor-Turkmani Language5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A
CS52.3 Subject Editor-Dari Language5 $0.00 $0.00 IC N 1-Aug-08 30-Dec-08 Vacant N/A
Subtotal: $0.00 $0.00
CS 53.1 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped
CS 53.2 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped
CS 53.3 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped
CS 53.4 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped
CS 53.5 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped
CS 53.6 Research specialist Curriculum 10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10 Dropped
10 $0.00 $0.00 01-Apr-09 31-Jan-10vicant,amount
reduced
3 $0.00 $0.00 01-Jan-10 31-Mar-11
12
$9,000.00 $9,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 01-Apr-09 31-Jan-10vicant,amount
reduced
3 $0.00 $0.00 01-Jan-10 31-Mar-11
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10vicant,amount
reduced
3 $0.00 $0.00 01-Jan-10 31-Mar-10 Qalamuddin
10 $0.00 $0.00 IC N 01-Apr-09 31-Jul-09vicant,amount
reduced
3 $0.00 $0.00 01-Jan-10 31-Mar-11
12
$12,000.00 $12,000.00
1-Apr_10‘ 31-Mar-11
Shifted from EQUIP 1
10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10vicant,amount
reduced
$0.00 $0.00 01-Jan-10 31-Mar-10Omar Gul Madani
10 $0.00 $0.00 IC N 01-Apr-09 31-Jan-10vicant,amount
reduced
3 $0.00 $0.00 01-Jan-10 31-Mar-10
12 $12,000.00 $12,000.00 1-Apr_10‘ 31-Mar-11
$45,000.00 $45,000.00
CS 53.7 Research specialist Curriculum
Subtotal:
Shifted from EQUIP 1
Subtotal:
ResearchCenter
Subtotal:
Senior Editor
Faiz Mohammad
IC N
IC N
Research specialist Curriculum CS 53.12
Haroon
CS 53.11 Research specialist Curriculum
CS50.29 Mohammd Hussain Farhang
Subject Specialis-Feqa
CS 53.9 Research specialist Curriculum
CS 53.10
CS 53.8 Research specialist Curriculum
Research specialist Curriculum Haroon
Rasol Zahir
New Curriculum Lump Sum Contracts
General Education
Mohammd Ibrahim ShahabCS50.32
476
475
474
Planed Actual Contract Signing/ Actual Date of Contract Signing
Date of Completion
Remarks
Progress of Procurement as
of
Name of Consultant
SL No.
Planned/Actual Date
ID PKG. No. (New)
Budget Procedure/ Method
IDA Prior Review (Y/N)
Name of Contract (Brief Description)Duration (Months)
CS 54.1 Development and Compilation of approx.32 Primary and High School third language booksLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines.
done
CS 54.2 Development and Compilation of approx.21 Secondary School third language booksLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines
done
CS 54.3 Development and Compilation of approx 28 Dari ,Pashto and Jafari Text books and teachers GuidesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines
done
CS 54.4 Development and Compilation of approx 31 Islamic Education Text books and teachers GuidesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines
done
CS 54.5 Development and Compilation of approx 27 Science , Mathematics and Social Studies Text books and teachers GuidesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines
done
CS 54.6 Translation of approx.44 Teacher guide booksLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines
done
CS 54.7 Translation of approx.63 Text Books of all classesLumpsum $0.00 $0.00 IC N 20-Jul-09 31-Dec-09
To be selected from Professionals following the Bank Guidelines
done
$0.00 $0.00
Grand Total: (TED+ EQUIP+Curriculum)$6,913,210.00 $5,727,569.00
Legends :
rose color
light yellow
Lime (green)
Subtotal:
already existing in equip II
already existing in equip II
Newly proposed and approved by WB
District Village Bid opening date
Date of Delivery/
Completion
1 2 3 4 6 7 8 9 10 11 12 13 15
2 TTC20.1 KapisaTTC-Learning Space
Mahmoud Raqi Center 10 140,000.00$ 140,000.00$ 8,091,074Af RCC NCB N MoE 08-Jul-08 Mar-09M/s Bahar Kapisa
3 TTC3.1 BamyanTTC-Learning Space
Bamyan City Center 10 140,000.00$ 140,000.00$ 9,304,585Af RCC NCB N MoE 08-Jul-08 Mar-09M/s Abdul Nazeef MASOOD
4 TTC5.1 Dai-KundiTTC-Learning Space
Nilli Center 10 140,000.00$ 140,000.00$ 7,510,021Af RCC NCB N MoE 25-Jun-08 Mar-09M/s Pesh Kadam CC
5 TTC7.1 GhorTTC-Learning Space
Chekhcharan Center 10 140,000.00$ 160,000.00$ -Af RCC NCB N MoE 25-Dec-09 Oct-09
1,660,000.00$ 1,680,000.00$ 24,905,680Af
5
Grand Total 1,680,000.00$
Total
Trinkot
Estimation Cost No of Rooms to
be Built
UrozganTTC-Compass- Urozgan
Location
Name of School Province Revised Estimation
Cost in USD
RCC
SL No.
1 TTC24.1 1,100,000.00$ Complete Campus
1,100,000.00$ Center
Contract Package Number*
145
Yes MoE Aug-08 Feb-09
RemarksActual Cost in AfghaniIDA Prior
Review (Y/N)Responsible
Agency
Planned/Actual Date
Type of Contract
Type of Construction
NCB-Af
1 2 3 4 5 6 7 8 9 10-Jan-00 11 12
Desk top Computer + UPS(IncludesTED)
70 $80,500.00 No No
Printers 50 $25,000.00 No No
Flash Desk 1 GB 130 $4,550.00 No No
G 1.3 Photocopier Machine (Includes TED) 35 $122,500.00 $122,500.00 NCB No No No 15th September 2008Procurement to be clubbed with 3.2&4.2
Procurement done through ICB G-052
$232,550.00
Laptop 6 $7,000.00 No No
Server Dual processor 1 $20,000.00 No No
4 KVA UPS with 7 KVA 1 $8,000.00 No No
Laser Printer A4 (Black and White, Double side, sorting and stapler)
1 $10,000.00 No No
Laser Printer A3 (Color) 1 $15,000.00 No No
HP Plotter A 1 1 $20,000.00 No No
HP Plotter A 0 1 $20,000.00 No No
$100,000.00
Laptop(Includes TED) 15 $17,500.00 No No
Laser Printer Color A3 1 $15,000.00 No No
IT Equipment Lot $10,000.00 No No
Laser Printer 2015n 15 $8,250.00 No No
G 3.2 Photocopy machine 2 $14,000.00 $14,000.00 NCB No No NoBids not yet called for want of funds
Procurement to be clubbed with 1.3&4.2
Procurement done through ICB G-052
$64,750.00Sub Total
ICB
ICB
ICB
Procurement done through ICB G-38
Procurement done through ICB G-38
YES
EMIS Requirements
Sub Total
$100,000.00
$50,750.00Bids are due for opening on 29 March 2009
YES
Estimated Cost (Total lot cost) in US$
Quantity
G 3.1
Sub Total
G 2.1
EQUIP + GMU Requirments
Procurement to be clubbed with G-1.2,G-3.1,G-4.1 and G-4.3
Procurement to be clubbed withG- 1.2G-2.1,G-4.1 and G-4.3
Ref. No. Estimated package cost in
US$
Review by Bank (Prior /
Post)
G 1.2 YES
School Kabul Province
$110,050.00Procurement done through ICB G-38
Bids are due for opening on 29 March 2009
Procurement MethodDomestic Preference (yes/no)
Bids are due for opening on 29 March 2009
Contract (Description) Remarks
Procurement to be clubbed with G-2.1,G-3.1,G-4.1 and G-4.3
Prequalification (yes/no)
Expected Bid-Opening Date Comments
Estimated Cost (Total lot cost) in US$
Quantity Ref. No. Estimated package cost in
US$
Review by Bank (Prior /
Post)Procurement Method
Domestic Preference (yes/no)
Contract (Description) RemarksPrequalification (yes/no)
Expected Bid-Opening Date Comments
G 4.2 Heavy Duty Photocopy machine 1 $10,000.00 $10,000.00 NCB No No NoBids not yet called for want of funds
Procurement to be clubbed with G-3.2&G-1.3
Procurement done through ICB G-052
G 4.3Laser Printer A4 (Black and White, Double side, sorting and stapler)
1 $10,000.00 $10,000.00 ICB No No YESBids are due for opening on 29 March 2009
Procurement to be clubbed withG- 1.2,G-2.1,G-3.1 and G-4.1
Procurement done through ICB G-38
hp 9250c digital sender 2 $14,000.00 $14,000.00
Westren Digital - Hard Drive 4 $1,500.00 $1,500.00
Server Computer 1 $8,000.00 $8,000.00
$35,000.00
Laptop Computer 55 $0.00
Desktop Computer+UPS 30 $0.00
Server Computer (Power Edge 840) 1 $0.00
Stablizer 20 $0.00
Printer 20 $0.00
Scanner 10 $0.00
Flash memory 1 GB 50 $0.00
$0.00
Canon EOS 50D SLR Digital Camera 1 $1,000.00
Digital Camera (one per province) 35 $0.00
$1,000.00
G 5.3 Laptop bag.case 50 $0.00 $0.00 NS No No No 01-Jul-09 Procurement Done
$0.00
Office Desk+Weeling Chair 60 $15,000.00
Meeting table+Chairs Big size 3 $3,000.00
Filling cabinet 90 $7,860.00
$25,860.00
G 5.4 M
Sub Total
Sub Total
NCB
G 4.1 1Bids are due for opening on 29 March 2009
G 4.4
No NoLaser Printer Color A3
$1,000.00 No No
N
G 5.2 NS
NS NNo
09-Jun-10$0.00 No
NEW REQUIREMENTS-MOE-PROCUREMENT DEPARTMENT
G 5.1No
$15,000.00 ICB YES
No
Sub Total
$15,000.00
Sub Total
Procurement done through ICB G-38
Procurement to be clubbed with G-1.2,G-2.1,G-3.1 and G-4.3
New Item Added
No 01-Jul-09
Sub Total
NCB No No No
Estimated Cost (Total lot cost) in US$
Quantity Ref. No. Estimated package cost in
US$
Review by Bank (Prior /
Post)Procurement Method
Domestic Preference (yes/no)
Contract (Description) RemarksPrequalification (yes/no)
Expected Bid-Opening Date Comments
Air Conditionar 5 $0.00
Gas Heater 15 $0.00
Thermoses 3 lit 50 $1,500.00 N
$1,500.00
G 5.6 Certificate Printing 400000 $0.00 $0.00 NS No No No 01-Aug-09
G 5.7TextBooks Printing in two Languages for Teacher Training Program
35 Dozen $0.00 $0.00 ICB No Yes YES 01-Jun-09
G 6.1 Network Infrastructure Package $0.00 $0.00 ICB No Yes Yes 01-Jul-09
$0.00 $0.00
Laptop computers 10 $15,000.00 $0.00
Printing Materials 1 $3,600.00 $0.00
Furniture 1 $15,000.00 $0.00
Projector 1 $0.00 $0.00
Scanner Heavey duty 1 $0.00 $0.00
Server 3 $0.00 $0.00
$33,600.00 $0.00
Furniture for TTC 1 $679,028.93 $679,028.93
Linbraries for TTC 1 $1,093,690.85 $1,093,690.85
Science laboratories for TTC 10 $800,084.00 $800,084.00
Computer labs for TTC 10 $1,277,850.00 $1,277,850.00
$3,850,653.78 $3,850,653.78
Anti Virus $0.00 $0.00
Websence $0.00 $0.00
Softwares $0.00 $0.00
G 6.5 Printing of Curriculum $2,900,000.00 $0.00 ICB No No Yes 10-Oct-10 New Items Added
$2,900,000.00 $0.00
Digital Cameras 2 $1,000.00 $7,000.00 NS N Yes Yes 01-Jul-09
Videp Cameras 1 $1,000.00 $1,000.00 NS N Yes Yes
Projector 1 $5,000.00 $5,000.00 NS N Yes Yes
Projector 2 $10,000.00 $0.00 N Yes Yes 15-Aug-10
Laptop Computers 9 $13,500.00 $0.00 N Yes Yes 15-Aug-10
HP Lserjet Printer 2 $11,000.00 $0.00 N Yes Yes 15-Aug-10
Photocopier Machiene 1 $5,000.00 $0.00 N Yes Yes 15-Aug-10
Scanner 1 $200.00 $0.00 N Yes Yes 15-Aug-10
UPS 4 $800.00 $0.00 N Yes Yes 15-Aug-10
Digital Cameras 5 $2,000.00 $0.00 N Yes Yes 15-Aug-10
Super Custom Mini Van 4 $80,000.00 $0.00 NCB N Yes Yes 15-Aug-10
Air Conditioning 3 $1,500.00 $0.00 NS N Yes Yes 15-Aug-10
$131,000.00
G8.1 Laptop Computer 103 $103,000.00 $103,000.00 ICB N Yes Yes 01-Jun-09To be clubbed with G 5.1 and Procured
$103,000.00 $103,000.00Sub Total
No No
G 7.2
Procurement Done
NCB
New Items Added
Sub Total
10-Jul-10
No
No 10-Jul-10
Sub Total
New Items Added
CURRICULUM
NEW EQUIP REQUIREMENTS
G 6.2
NCB No
NCBG 6.4
G 7.1
No
NS 01-Jun-09
Sub Total
Sub Total
Sub Total
Sub Total
No
No No
NCB
NEW EMIS REQUIREMENTS
New Items Added
G5.5 $1,500.00
10-Jul-10
Sub Total
New Items Added
TED Requirements
G 6.3
No No
No
Estimated Cost (Total lot cost) in US$
Quantity Ref. No. Estimated package cost in
US$
Review by Bank (Prior /
Post)Procurement Method
Domestic Preference (yes/no)
Contract (Description) RemarksPrequalification (yes/no)
Expected Bid-Opening Date Comments
22 $7,478,913.78TOTAL GOODS
Expected proposals
submission date
Date of Completion
1 2 3 4 5 5 6 7 8 9 10 11 12
1 CA 1.1 Scholarship for girls 48 $ 10,000,000.00 $ 2,000,000.00 SSS Y
Proposal due for opening on 13th May 08
Dec-12 GTZ Contract Signed
2 CA 1.2District Teacher Tranining Teams-Pacakage 1
30 $ 9,500,000.00 FBS Y
Proposals Opened on 17 th march2008
Jun-11Just for Afghan Capacity and Knowledge (JACK), in joint venture with Save the Children
Contract Signed
3 CA 1.3District Teacher Tranining Teams-Pacakage 2
30 $ 10,987,000.00 FBS Y
Proposals Opened on 17 th march2008
Jun-11 ADA & Partners Contract Signed
4 CA 1.4District Teacher Tranining Teams-Pacakage 3
30 $ 2,631,000.00 FBS YProposals Opened on 28th April 08
Jun-11 Save the Children & others Contract Signed
5 CA 1.5 Principals Training 30 $ 1,500,000.00 $ - FBS Y Dropped
6 CA1.6Third Party Evaluator for District Teacher Training
30 $ 500,000.00 $ 22,569,000.00 QCBS Y 15th Nov 10procurement process to begin
500,000.00$
35,118,000.00$ 22,569,000.00$
9 CA1.7External Evaluation of IMPACT
1,000,000.00$ -$ QCBS Y 15th Nov 10procurement process to begin
$ 200,000.00 Dropped
10 CA1.8 EMIS Development 500,000.00$ -$ QCBS Y 15th Nov 10procurement process to begin
300,000.00$ Dropped
11 CA1.9 TTC Teachers tranings 12 $ 4,870,000.00 $ 1,020,000.00 QCBS Y 20-Mar-11New Trainning Purposed
12 CA1.10Monitoring and Management team consultancy
12 $ 740,000.00 $ 740,000.00 QCBS Y 20-Mar-11New Trainning Purposed
8 GRAND TOTAL: 36,618,000.00$ 22,569,000.00$
Total:
Planned/Actual Date
Name of Consultant Progress of
Procurement as of
Remarks
Merged with DT3 Packages
SL No.ID/ PKG
No.Procedure/
Method
$ 20,569,000.00
IDA Prior Review (Y/N)
Name of Contract (Brief Description)
Duration ( Months)
Estimated Cost Actual Contract Price