52477 - World Bank Documents

365
International Bank for Reconstruction and Development International Development Association SecM93-1328 FROM: Vice President and Secretary January 3, 1994 MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of December 15, 1993) Distribution: Executive Directors and Alternates. Office of the President Executive Vice Presidents, IFC and MIGA Vice Presidents, Bank, IFC and MIGA Directors and Department Heads Bank, IFC and MIGA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of 52477 - World Bank Documents

International Bank for Reconstruction and DevelopmentInternational Development Association

SecM93-1328

FROM: Vice President and Secretary January 3, 1994

MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS(As of December 15, 1993)

Distribution:

Executive Directors and Alternates.Office of the PresidentExecutive Vice Presidents, IFC and MIGAVice Presidents, Bank, IFC and MIGADirectors and Department Heads

Bank, IFC and MIGA

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb350881
Typewritten Text
52477

TABLE OF CONTENTS

Summary of Bank and IDA Proposed Proiects

Information on Environmental Assessment vBusiness Opportunities vi

SECTION REGION PAGES

I. AFRICA 1 40

Angola . . . . . . . . . . . . . . . . . 1Benin . . . . . . . . . . . . . . . . . . 2Botswana . . . . . . . . . . . . . . . . 3Burkina Paso . . . . . . . . . . . . . . 3Burundi . . . . . . . . . . . . . . . . . 4Cape Verde . . . . . . . . . . . . . . . 5Central African Republic . . . . . . . . 6Chad. 6Comoros. 7Cote d'Ivoire . . . . . . . . . . . . . . 7Djibouti . . . . . . . . . . . . . . . . 8Equatorial Guinea . . . . . . . . . . . . 9Eritrea . . . . . . . . . . . . . . . . . 9Ethiopia. 9Gabon . . . . . . . . . . . . . . . . . . 11The Gambia . . . . . . . . . . . . . . . 11Ghana . . . . . . . . . . . . . . . . . . 12Guinea . . . . . . . . . . . . . . . . . 13Guinea-Bissau . . . . . . . . . . . . . . 16Kenya .16Lesotho .18Madagascar . . . . . . . . . . . . . . . 18Malawi . . . . . . . . . . . . . . . . . 20Mali .21Mauritania . . . . . . . . . . . . . . . 21Mauritius . . . . . . . . . . . . . . . . 22Mozambique . . . . . . . . . . . . . . . 23Niger .24Nigeria .25Rwanda .29Sao Tome and Principe . . . . . . . . . . 30Senegal .30

AFRICA REGION (Contd ... .)

Seychelles . .. . . . . . . . . . . . . 32Sierra Leone . .. . . . . . . . . . . . 32Swaziland . .. . . . . . . . . . . . . . 33Tanzania . .33Togo . . 35

Uganda . . . . .36Zambia .... . . ...... . . . . . 37Zimbabwe .... . . ..... . . . . . 38Africa Regional . .. . . . . . . . . . . 39Union Monetaire de l'Ouest Africain . . 40Western Africa . .. . . . . . . . . . . 40

EAST ASIA & PACIFIC REGION 41 - 65

Cambodia .... . . ..... . . . . . 41

China .... . . . . ... . . . . . . . 41Fiji ........... . 49Indonesia .... . . ..... . . . . . 49

Korea .... . . . ...... ........ 55Lao, People's Democratic Republic . . . 56Malaysia . . .. . . . . . . . . . . . . 57Maldives .... . . . . ..... . . . 58Mongolia .... . . . . ..... . . . 58Papua New Guinea . . .. . . . . . . . . 59Philippines . . .. . . . . . . . . . . . 59Thailand . . .. . . . . . . . . . . . . 62Vanuatu .... . . . . .. . 63Viet Nam ..... . . . . ..... . . . 64Western Samoa . . .. . . . . . . . . . . 65

EUROPE AND CENTRAL ASIA 66 - 91

Albania .... . . . ..... . . . . . 66Armenia .... . . ...... . . . . . 67Azerbaijan . .. . . . . . . . . . . . . 67Belarus .... . . . ..... . . . . . 68Bulgaria . . . . . . . . . . . . . . . . 69Croatia . . . . . . . . . . . . . . . . . 71Czech Republic . .. . . . . . . . . . . 71Estonia . .. . . . . . . . . . . . . . . 71Georgia .... . . ...... . . . . . 72Hungary .... . . . ..... . . . . . 73Kazakhstan . . . . . . . . . . . . . . . 74Kyrgyz Republic . .. . . . . . . . . . 75Latvia . .. . . . . . . . . . . . . . . 76Lithuania .... . . ..... . . . . . 77Moldova .... . . ...... . . . . . 78

EUROPE AND CENTRAL ASIA (Contd.../...)

Poland . . . . . . . . . . . . . . . . . 79Romania . . . . . . . . . . . . . . . . . o8Russian Federation . . . . . . . ... . . 82Slovak Republic . . . . . . . . . . . . . 86Slovenia . .. . . . . . . . . . . . . . 87Tajikistan . .. . . . . . . . . . . . . 87Turkey . .. . . . . . . . . . . . . . . 87Turkmenistan . .. . . . . . . . . . . . 89Ukraine .... . . ...... . . . . . 89Uzbekistan . .. . . . . . . . . . . . . 90

IV. LATIN AMERICA AND CARIBBEAN 92 - 124

Argentina . . . . . . . . . . . . . . . . 92Belize .... . . . . . . . . . . . . . 95Bolivia . . . . . . . . . . . . . . . . . 95Brazil . . . . . . . . . . . . . . . . . 97Caribbean Region . . . . . . . . . . . . 101Chile . . . . . . . . . . . . . . . . . . 101Colombia.. ... 103Costa Rica . . . . . . . . . . . . . . . 105Dominican Republic . . . . . . . . . . . 106Ecuador.. .... 106El Salvador . . . . . . . . . . . . . . . 108Guatemala . . . . . . . . . . . . . . . . 108Guyana.. .... 109Haiti . . . . . . . . . . . . . . . . . . 110Honduras . . . . . . . . . . . . . . . .111Jamaica . . . . . . . . . . . . . . . . .111Mexico . . . . . . . . . . . . . . . . . 112Nicaragua . . . . . . . . . . . . . . . . 116Panama . . . . . . . . . . . . . . . . . 117Paraguay . . . . . . . . . . . . . . . . 117Peru . . . . . . . . . . . . . . . . . . 118Trinidad & Tobago . . . . . . . . . . . . 120Uruguay . . . . . . . . . . . . . . . . . 121Venezuela .... . . . . . . . . . . . . 122

- iv -

V. MIDDLE EAST AND NORTH AFRICA 125-135

Algeria.. . . . . . 125Egypt, Arab Republic of .127

Iran . .127Jordan. 128Lebanon . .129Morocco . .130Tunisia . .132Yemen, Republic of . .134

VI. SUTH ASIA 136 - 152

Bangladesh .... 136India.. . 138Nepal ... 145Pakistan ... 146Sri Lanka ... 151

VII. NEW PROJECTS ADDED IN THIS ISSUE 153 - 157

VIII. PROJECTS DROPPED FROM LENDING PROGRA 158 - 160AND PROJECTS SIGNED

MOS ANNEX I

Environmental Overview of Category A Projects I1 - 1134

Environmental Overview of Category B Projects 1135 - 1183

Listing of Category C Projects I184 - 1187

Listing of Category T Projects I188 - I190

MOS ANNEX II

Global Environment Facility - Quarterly Ill - II6

on Investment Projects

Secretary's Department

INFORMATION ABOUT THE ENVIRONMENTAL ASSE'SPE PROCESSAPPLIED TO BAMK AND IDA PROPOSED PROJECTS

In October 1989 the Bank established a specific policy and procedures forenvironmental assessment and related environmental analyses of IBRD and IDAlending operations. Under this environmental assessment process, the type,timing and main issues of environmental analysis to be performed by the borrowerare to be confirmed at the time that a given lending operation Is initiated intothe Bank's prospective lending program and thereafter reported and updated on aquarterly basis in the Monthly Operational Summary.

In October 1991 the Bank revised its policies and procedures so thatprojects are now assigned one of the following categorles based upon the nature,magnitude, and sensitivity of environmental issues:

Category A - Environmental Assessment is normally required as theproject may have adverse and significant environmentalimpacts.

Category B - More limited environmental analysis is appropriate, asthe project may have specific environmental impacts.

Category C - Environmental analysis is normally unnecessary.

'UW (unclassified) is being introduced to indicate structural and seetoraladjustment loans, which do not fall within one of the above three categories forpurposes of the directive governing environmental assessment.

The 1991 revislon also introduced the use of a standard environmental datasheet for all projects to identify the main issues and schedule for any requiredenvironmental analysis.

Project descriptions in every issue of the Monthly Operational Summaryinclude the environmental category A, B, or C, except in the case of structuraland sectoral adjustment loans which are designated "UN. On a quarterly basis (inthe January, April, July and October issues) the Monthly Operational Summarycontains an environmental annex which includes the environmental data sheets forCategory A projects, data sheet headers for specific Category B projects, and alisting of projects in Categories C and T ("to be determined").

-vi-

BUSINESS OPPORTUNITIES

Borrowing countries through their implementing agencies have fullresponsibility for the design and implementation of World Bank-financed projects,including the hiring of consultants 'and'procurement of goods and works. Manycontracts for consulting services, as vell as some for goods and works, areprocured prior to loan/credit approval (advance contracting). Contracts forconsulting services, unlike those for goods and vorks, are not usuallyadvertised.

Therefore, consultants, in particular, should contact the responsibleimplementing agency early in the project preparation period to express theirpossible interest in providing the services described in the NOS. Theinformation in the NOS is intended to be adequate to enable consultants to assesstheir possible interest. Further informatlon, if needed,-sh6ould be requested ofthe implementing agency. The likelihood of a timely response is enhanced if thequeries are brief and to the point.

Firms should contact the World Bank (preferably by fax) only if they areunable to obtain a response from the implementing agency.

General information about business opportunities under Bank loans/creditsmay be obtained from the World Bank Business Affairs Adviser at fax number (202)676-0578.

Member Country, Amount &Irplmnting Probable Stage of Processing andAency Lender Project Consulting Services Action on Procurement'

Ratioal 27 1 Urban Enviroment and Sanitation - Conaulting services will Project underDirectorate of (IDA) Institutional strengthening of the be required for preparation.Waters National Directorste of Waters and of technical assistance,

the provLncial Government of Luanda. constructionProject vLIl also includes supervision, sector(C) Improvement of public and individual studies, end final.water supply and sanitation facilitLes design.In Luanda and dissemination in fiveprovincial capital citiess tb) urban andrural wator supply and sanitation sectormaster planal and (c) a pilotrehabilitation ef alum. EnvironmentalAsslessont Catloorv: To By Determined.

Ministry of 30.5 R) Social Action - Project will provide Consulting services will ProJect underFinance (IDA) employment and skills development for be required. preparation.

Angola's most disadvantaged citizens,vLth program of labor-based work. Willbegin in urban areas and focus in theshort-term on displacod peopl and slumdwellers. Evironmental AssessmentCatesory: To Be Determined.

MLnistry of 135.4 Rehabilitation Adjustment - Would Nsed for consultants not Project underFinanco (IDA) provide import financing to support ret determined preparation.

rehabilitation adjustment program.Environmental Assessmnt Catesorv U.

Central Bank. 20.1 Private Sector Development - The project Need for consultants not Project underMinistry of (IDA) will support xtensive deregulation of yet determined preparation.Industry and private economic activity and theFinance establishment of property rights, and

also initiate tax end trade reforms.Environmental Assessment Cateoorv U.

Ministry of 19.3 (R) Agricultural Services - The project Need for consultants not Project preparation onAgriculture (IDA) would include agricultural education, yet dotermined, hold due to country

and research, animal health, support to situation.land titlinga and support to the reformprocess. Environmntal AsessmentC-tcxory B._

Addresses of Iaplementing Agencies of new projects are given in Soction V of the Siuory.The mount is in millions of US dollars and is approximate and tentative. SAY is the acronym for the Special Facilityof Sub-Saharan Africa.

}J The l-tter (U) before projects means that the project is a new listing in the suinmryl the letter (R) means theinformation about the project has boon revised since the last issue.

Al This colum contains available inforsation, if any about action with rospect to the procuroment of goods and servicesexpected to be financed by the bank or IDA, including retroactive financing, expenditures under the ISW/IDA Project.

-2-

Member Country, Amount &Implementing Probable Stage of Processing andAgency I Lender 2 Project 1 Consulting Services Action on Procurement 4

To be determined 10.0 (N) Labor Force Training/Development - Consulting services are Pre-identification under(IDA) Project is intended to support in- possible in the areas of way.

service training of employed personnel informal sector trainingin formal and informal sectors, with needs.emphasis on women and workers intransition. Environmental AssessmentCateaorv: To Be Determined.

To be determined 40.0 Transport Sector - Project will include Need for consultants not Pre-appraisal mission(IDA) sector management reform, maintenance of yet determined, scheduled for March 1994.

existing infrastructure, liberalizationof transport operations, and expansionof rural transport network.Environmental Assessment Categorv B.

Ministry of 16.0 (R) Private Sector Development - Project Consultants are being Pre-appraisal missionIndustry, Banque (IDA) would support private sector activities -selected, scheduled forCentrales des and initiatives through, inter alia, February/March 1994.Etats de 1'Afrique provision of credit, institutionalde l'Ouest support, entrepreneurship development,(BCEAO), Financial and studies. Environmentil s ise^ssmentInstitutions, and Catezorv C.Small and MediumEnterprises (SKEs)

Projet de S-curit- 10.0 (R) Food Security - Project would assist Assistance from national Appraisal completed.AlimentairelMini- (IDA) Government in improving the-food and international NGOs. Negotiations scheduledstere du security standards of the more for December 16, 1993.Developpe- vulnerable population groups of thesent Rural country through simple agricultural,

commercial, fisheries and penr-urbanactivities aiming at improving theincome base of those groups through newemployment opportunities and regularaccass to food in most risky areas.Environmental Assessment Category C.

Ministry of Public 15.0 (R) Population and Health - Project Consulting services will Preparation missionHealth (IDA) seeks to; (a) expand basic health care be required for sector scheduled for January

system, (b) upgrade quality of first financial management, 1994.referral care; (c) improve sector hospital management, andmanagement and decentralize MIS systems; MIS systems specialists.(d) expand family planning andcontraception prevalence. and(b) promote private sector care.Environmental Assessment Category B.

Direction de 9.8 (R) Rural Water Supply and Sanitation Assistance expected from Appraisal mission in thel'Hydrauliquc (IDA) Sector - Project wlll support the national and field. Yellow cover

decentralization of rural water supply international NGOs. scheduled for Januaryactivities, and development of local 1994.private sector and NGO participation.Will also support construction of newwater points, and promotion of low costsolutions for rural sanitation.Environmental Assessment CateRorv B.

Ministry of Plan 12.6 (R) Economic Management Support - The Studies of Ministry of Negotiations completed.nd Economic (IDA) project will consist of: (a) institu- Planning and Caisse Approved by the ExecutiveRestructuring tional restructurings (b) capacity Autonome d'Amortissement Directors on November 9,

building through technical assistance completed under PPF 1993. Signing of creditand a training center; and (c) studies Tinancing. agreemnt expectedand institutional measures as needed shortly.through the implementation of theadjustment program. EnvironmentalAssessment Category C.

-3-

Member Country, Amount &Implementing Probable Stage of Processing andAncy I Lender Project Consulting Services Action on Procurement

(Cont'd)

Minietry of 21.5 (R) Education Sector Investment - The Consulting services vill Appraisal missionNational Edueation (IDA) project would assist the Government in be required. completed on May 28,(MNE) improving primary education quality, 1993. Negotiations

access, planning, and management by- scheduled for January 24,<a) improving in-service training for 1994.primary school teachers; (b) providing A PPF request oftextbooks; (c) improving access with a US$380,000 has beenspecific emphasis on girls approved.participation; and (d) strengthening thesector management capacity within theMinistry of Education. EnvironmentalAssessment Category C.

To be determined 10.0 (N) Okauango Conservation and Management Consulting serviees will Initial EPS is under(IDA) - Project will assist in the protection be required, preparation

and management of biodivorsity in thediverse ecosystems of the OkauangoDelta. The focus will be on developingsustainable management and marketing ofwildlife resources by local conmmunities,supporting a biodiversity researchcenter, and promoting high value, lowimpact eco-tourism for the region.Environmental Assessment Category B.

To be determined 45.0 (R) Private Irrigation - Promotlon of Consulting services will Pro-appraisal mission(IDA) private irrigation, principally small- be required. scheduled for March 1994.

scale, by low-lift pumping from shallowaquifers; possibly also large-scaleirrigation using storage provided byexisting earth dams. Total project costestimated at US$48.0 million.Environmental Assessment Category. ToBe Determined.

To be determined 39.0 Mining II - Project will provide Consulting services will Project under(IDA) assistance to the Government in: be required. preparation.

(a) improving the enabling environmentfor prlvate investment;(b) restructuring and strengtheninggovernment supervisory institutions, andupgrading and reorganizing thegeological database; (c) promotinginvestment in large scale and mediumscale mining projects by privatecapital; and (d) improving the social,health, educational, and safetyconditions in the artisanal miningcamps. Environmental AssessmentCate,or-Y To Be Determined.

To be determined 45.0 Agricultural Services II - Follow up to Consulting services will Project preparation under(IDA) the Agricultural Services I Project, be required. Estimated way.

Concentrating on crop protection and at 200 staffweeks.agricultural education in addition toextension and functional literacy.Total project cost is estimated at

US$50.0 million. EnvironmentalAssessment CateROrv B.

Member Country Amount &Implementing Probable Stage of Processing endAgncrY Lender ' Project Consulting ServLcos ActLon on Procurement'

(Cont'd)

Miniatries of 23.4 (R) Population and AIDS - Project seeks Consulting services vill Appraisal mission in theHealth, Social (IDA) to develop and Implement a population be requlred, field.Affairs and progrsm and AIDs prevention program.Familys FinOnce Envirgrnentol Assssmet Catesory C.and Planning

Xinistry of 100.0 SAL rl - Second phase of macro-polLcy To be determined. Identification to beginFinance nd (IDA) reforms, including tariff reform, following release ofPlanning nviroMnental Assessment Cotagory U. second tranche of SAL I.

To be determined 40.0 (R) Urbsn Environment - Projoct seoks to To be determined. Appraisal scheduled for(IDA) Lmprove manageomnt of natural resources March 1994.

and urban management, and to upgrade the A PmT of US6S5S,OOO wasinfrastructure of Ouagadougou to improve approved on September 30,hcalth standards. Total project cost is 1992.US$40.0 million. EnvironmentalAssessment Cateaory B.

To be determined 5.0 Capacity BuLlding for Environment To be deterianed. Preparation under way.(IDA) Management - Trainlng and institutional A PP? of US$280,000 was

management for managlng the rural end approved on January 4,urban environments. Total projcet cost 1993.Is US$10.0 million. nvlrJmxntalAssessment Cateaorv C.

Ministry of 32.8 (R) Ealth and Nutrition - The project Consultants will bo Negotiations postponedHeolth, Social (IDA) would: (a) improve the quality of required. md-January 1994.Affairs ad Family health servLces through upgrading of (CofinancLng *xpected

facilities and staff skills, from GeCrmnm (tW) anddecentralization and lntroduction of OPEC Fund.)essential drugs: (b) reducemicronutrient deficiency, (a) achivocontrol of endemic parasltic diseasesgand td) strangthen sector Lnstitutions.Environmental Assessment Cat-ory C.

Fonds de 10.0 (R) Coamunal Iafrastructure - Project to Roed for consultants not IdentifLcation missionDeveloppement (rDA) include feeder rods and other coamunal yet determined. rescheduled due toComumal (?DC) infrastructure rehabllitationj country situation.

Improvement with a matching grantmechanism managed by a CommunalDevelopment Fund. EnvironmnntalAssessment Catesoryt To Be Detramined.

Ministry of 28.6 (R) Telecomunications III - The proj3ct Consulting services will Project underTSlecozmunLeations (IDA) will consist of: (i) technical be required from flrs preparation.

assistance for capacity bulldLng under a in the fields of1Lberalized institutional framework institutLonal reform,(b) creation of a regulatory structurel privatisation,and (a) an analysis of option, management andIncluding privatlsatlon and partnerships management Lnformatlonor joint venturs. EInironminhz!f systems.Assessment CatSoX C.

Member Contry, Amount &Zmplem nting Probable Stage of Processing andAgency Lender Project 0 Consulting Services Action on Procurement 4

(Cont'd)

Ministry of 32.2 Education Sector V - The project Vill Consulting services vill Project underZducation (IDA) assist the Covrnment in lmprovement of be required during preparation, en

the efficiency, quality and relevance of preparation end instLtutional andhigher education and scientiflc institutional links and financial study of theresearch. EvXronmXntal Axsessment joint ventures with University of Burundi isCatexory C. regional nd under way.

internationalinstitutions are likelyto be developed duringimplmentation.

Hinlstry of Land 2.0 (R) Natural Resource Management and Consultlng services Project underPlanning, Tourism (IDA) Environment - Implementation of required on social preparation.t Environment environmental actlon plan. Project forestry and natural

would follow up aspects raised in the resources, mapping andNational Environmental Action Plan such geographic informationas% (a) development of soil system.conservation, agro-forestry,reforestations (b) improvement of forestmanagoment (c) development of forest,agra-forostry, environmental research;mnd td) improvement of local and centralinstitutions. Environmental Assessment

Ministry of Health 26.3 Health Sector Reform - The objectives One long-term consultant Appraisal report under(IDA) are to: (a) strengthen the rural has been recruited for preparation.

hospital networks (b) implement a health insuranc.prepayment schem for non-formal sector(about 94% of the populatLon),(c) improve drug supplies. and(d) possibly implement nationalinformation education communicationstIEC) policy. Environmental AssessmentCatenorv C.

Ministry of 8.1 (R) Public Sector Reform and CapacLty Consulting sorvices wlll Appraisal missionEconomdo (IDA) Buildins - Project will: (t) support be required. complated. BoardCoordination, civil service reforms, tb) help build presentation schedul.dMiListry ef Public economic management capacity, for January 11, 1994.Administrltion tc) support efforts at decentralizstions

and td) help reform legal and judicialsystems and (e) support procurement andcontracting reform. EnvironmentalAssessment Catexorv C.

Ministry of 13.2 Education II - The objective of this To be determined. Project being identified.8ducation (IDA) projoet is to outline support to primary

education, and development of postprLmary education including expansionand *nhancement of quality of secondaryeducation. Environmental AssessmentCatesory C.

-6 -

Member Country, Amount &Ipl-menting Probable Stag of Procssng ndAgency Lender ' Project ' Consulting Services Actlon on Procureomnt 4

(Cont'd)

Ministry of 12.* J R) Basic Educatlon and Training - The Consulting services will Appraisal missionEducation, Justice (IDA) project will assist the "overmnont in be required. scheduled for Harch 1994.and Labour implementing its training and manpovr A PPF of US$250,000 was

develapment strategy, and support the approved on December 31,transition to a six-year basic education 1992.system (nI). Will slso supportprofessional and Vocational trainLngprograms, teacher's training,infrastructure and quality improvamentsfor EB1. Environmental Assessment&t-sory C.

Ministry of Rural 40.0 (R) Livestock Development II (for rly Technical assistance in Yellow cever report beingDewvlopment (IDA) Rational Livestock Development }1) - mutuallistic and drafted.

PrLvatisation of most livestock dovlopmeBnt credit,service*s consolidation of technical livestock research,achievements of tho first phases and epidemiology, livestocklmproved mansa ment of pastoral areas, production, managementEnvy_ronMnt*l Assessment Cate.orv A. and accountLng will be

required.

MLnistry of 20.0 (R) Basic Education - Investments to Consulting services will Preparation rescheduledNational Zdunation (IDA) Improves (a) access to primary and be requird. Specific to January 1994.(MIE) lover secondary schoolings areas to be deterilned.

(b) educational quality as indLiated bystudent learnLng (outcomes) as well asthe poliey and institutionalenvironment, particularly policyanalysis end (c) monitoring andevaluation functions of the MN toachieve the above. EnylironntalAsoeosment Catesory C.

Linistry of Plan 20.0 (R) Publlc Works and Capacity BuLlding - To be determined. Negotiations scheduledand Cooperation (IDA) Execution of a small scale, labor- for February 1994.

intensive public works to fightunemployment, buLld capacity of localengineering and construction firms, endtest faster end more transparentprocurement procedures. zLuunnnt-lAssessment Category B.

MinLstry of Realth 15.0 CR) Esalth nd Population - The project Consultants will be Negotiations scheduled(IDA) wouldi (a) reorient health care service required. for end February 1994.

to focus on the provision of basicprimary care servlces includingnutrition and family planningI(b) develop nd promote a populationpolicy; and (c) develop complementaryprogramolaotivities in the areas ofnutrition, health, and family planningeducation, focused particularly onwomen. Environmental AssessmentsateEp ,C.

Nember Country, Amount sImplementing Probable Stag° of Pmooeslag adAgncy I Lendbt r Project 3 Consulting Services ActLon on Procurement 4

(Cont'd)

Ministry of 10.0 Agricultural Services - Promotion of Consultants will be Project underAgriculture (IDA) effoetive agricultural support services required. t stlated at preparation.

prtmarily focusing oan resoarch and 200 staffveeks. (Cofinancing will beextension possibly vith functLonal sought possibly fromliteracy lcluding adopting sgricultural U C.)research, and support to groupactivities. Total project cost*atimated at US$10.0 mllilon.Environwental AJsesmwent Catesorv C.

Ministry of 8.6 Third Education - The project will Need for consultants not Identification missionEducatlon (IDA) continue: Ca) strengthening of delivery yet determined, scheduled for February

of education through quality inputs, 1994.acomuity participation anddecentralised management, and(b) support to vocational training.Environmental Assessment Category: To

Ministry of 13.0 (R) PopulationiRum n Resources - Will One consultant has been Approved by the ExecutiveHealth/Education (rDA) strengthen the prLmary health core recruited. Directors on December 14,

system, particularly the quality of g993.maternal and child health/familyplanning services; and support consmmitydevelopment activities through acomunity development fund.Environgmutal Assessmnnt Catesory S.

oands do 20.0 (N) Labor Force Training Support - Consulting servioes Appraisal missionDeveloppemnt do (IDA) Project will support in-service tr Lanng possible In the areas of scheduled for JanuaryFormation of formal sector vorkers, and displacod CO support. 1994Professionnalle workers ln transition and Lnforzal

'ector workers vith ephasLs on women'straining needs. Will also support labormarket monitoring studies.Environmental Assessment Catexory: To

To be determined 20.0 (R) Human Resources II - Project vill Consulting services will IXPS completed.(IDA) provide support for the provavson of be required. Appraisal mission

labor force development services to scheduled for January 24,increase the quality and flexibility of 1994.tbe labor force in the formal andinformal sectors, as a contributor togrowth. Environmental AssessmentC&texor!r C.

Rural JLiancia1 6.3 (R) Rural Savings and Loan Consultants will be Negotiations completed onCooperatives (IDA) Rehabilitation - To strengthen the financed through November 12, 1993. Board

network of creps (mutual savings and bilateral funds in presentation scheduledloan cooperatives) through technical ad accordance with their for January 23, 1994.financial assistanc Enviro.x nntz l own procedures.Assessment Catesorv C.

-8-

Member Couatry, Amount Ipainenting Probable Stage of Processing andAgency ' Lender 2 Project Consulting Services Actlon on Procurement '

cMT DsrWOIR(Cont'd)

NLnistry of 25.0 (R) National Agrlcultural Service - Consulting cervices Appraisal completed.Agriculture and (IDA) Support for reorganisationtreinforcement required for financial Negotiations expected forAnLmal RUsouress, of the current structure of key management auditing of January 24, 1994.

iLnistry of agricultural services (research, extension agencies, andscientific extension) to ensure the adequate supply for human resourceasResearch and and diffusion of alternative management.Hlgher Education technologies and cropping systems.

Environmental Assessment Cateaory C.

MinLaistry of 30.0 Road Maintenance and Rehabilitation - ConsultLng servLces vill Post appraisal msLsionEquipment, (IDA) The project wil: (a) halt be required for: tentatively scheduled forTransport and deterLoration of existing roadas (a) financial April 1994. Yllow coverTourism (MITT) (b) reform organizational structure of managemntl staff appraisal report

road maintenance, partly by privatising (b) institutional tentatLvely scheduled forspecified activitlest and (c) reduce reform; and (c) human July 1994.rural transport costs by upgradLng the resource management.maintenance of farm-to-market roads.Environmental Assessment Catasorv B.

Miniatere des 30.0 Private Sector Energy - Uould allow Need for consultants not Appraisal missLonMines, ldustrle (Bank) government to have local gas resources yet determined, scheduled for January 10,St Inergie, developed by the private sector to 1994. A generalPETROCI reduce dependence on imported energy. agreemnt between the

Pover supply reliability would be Government and theLmproved by new gas-based generating project's sponsors wascapacLty. The project would lessen the signed on December 21,environmental impact of energy 1992. Balc engLneerLngconsumption by movlng away from liquid completed.fuels to natural gas, as well asencouraging additional private sectorlnvestment in the energy sector.Environmental Assessment Catezorv A

-e

Ministry of Health 15.0 Health - Project proposes to: Consultants have been Project under(M08) (IDA) (a) reorganLze health sector to better recruited for project preparation.

focus on public health and Improved preparation. A PPF advance ofmanagement of hospLtals. (b) traln US$350,000 has beenstaff, partLcularly ln publlo health and approed.Ln managementl and (c) rehabilitatehompLtals. Environmental AssessmentCatezorv C.

Ministeres des 10.4 Transport - Project will include: ConsultLng services may Project underAffaires XaritLmes (IDA) (a) reinforcement of the Port of be requlred for (d), (e) preparation.

Djibouti as trade gateway to EthLopia, and (f).(b) establishment of specialized portareas for transit traffLc; (c) lmprovedliterfacing with rall and roadstd) mplementatLon of perlodlcmaintenance system-; and() establishment of cost recoverypractLces, and (f) deregulation oftransport markets EnvlronmentalAssessment Category: To Be Detormined.

Member Country, Amount &Imlemnting Probable Stage of Process in andA cy Lend r I Project I Consulting Services Action on Procurement 4

Minlstry of 10.0 (R) National Resource Managemnt and PAO Investment Center FAO Inestment CenterAgriculture and (IDA) Conservation - Project's overall has organized a five project preparation teamForestry objective would be to assist the member consultant team completed field work in

Government in implementing a National for project document October 1993. ProjectNatural Resource Managemnt Plan, in preparation. FORINDECO document should beorder to assume both an optiml organized a four mmber completed by early 1994.production level from the forest and consultant teem for the Environmental assessmntconservation of the environment, environvental team presently in theBnvironmental Assessment Catetory A. assess mnt, which will field.

be financed under theNorwegian Trust Fund.

Ministry of 4 1 Sconomic Management - Strengthening of To be determined. Appraisal missionPlanning (IDA) public sector capabilities for fiscal tentatively scheduled for

management. Environmental Assessment CY94.Categorv C.

To be determinod 20.0 Euman Resource Development - The International Identification under way.(IDA) objective is to lmprove maternal and consultants on short- (Co-financiers possible

child health care nutrition practices, term contracts (1- but to be confirmed.)basic health services for the poor end 4 months) will befamily planning, through community led required to assist localactions, and through improving the specialist teams toincomes of poor women and families. carry out surveys onEnvironmental Assessment CatesorV C. health and nutrition

practices and coamunitycapacity to manageprojects.

Water Supply and 30.0 Water Engineering - Project seeks to Consulting services will Initial Executive ProjectSewrage Authority (DMA) provide: (a) institutional support for be required. Sumary under(WSSA), Addis capacity building for water sector preparation.Ababa Water end institutionst (b) assistance in sectorSewerage Authority development planning and in pre-(AWSA) Investment studiesl and (c) assist in

the medium and short-term rehabilitationand augmentation of urban water supplyschemes. Entironmental AssessmentCategory: To Be Determined.

Minlstry of 100.0 (R) National Fertilizer Development - To be determined. Post appraisal missionAgriculture and (IDA) The project vould support fertilizer postponed until JanuaryAgricultural importation end fertilizer policy reform 1994.Inputs supply including phased privatization of theCorporation marketing chain. It vould also support

institution building in the followingareas: (a) linkages vith research/extension; (b) strengthening fertilizerrelated storage and transportation,(e) technieal assistance in implementingthe program; (d) private sector capacityin fertilizer importation anddistribution; and (e) human resouresdevelopment programs. EnvronmentalAssessment Category B.

- 10 -

Member Country, Amount LImplementing Probable Stage of Procossing andAgency ' Lender Project ' Consulting Sorvices Action on Procurement

(Cont d)

Ethiopia 30.0 0 R) Telecom VII - Project will include: Consulting services vill Project processingTelecomnioationa (IDA) (a) supply and installation of be required for dependeut on agreementAuthority (ETA) t-lecommunication *quipment including developing appropriate between Bank and

exchanges, external line plant, long sector restructuring and Government on necessarydistance, power and air conditioning long-term network institutLonal reforms.equipment, (b) technical assistance for: development strategies.Mi) sector restructuring and long-termnetwork development strategies.(ii) implemntation of managementimprovements to enable full commerciali-zation of ETA, and (iiI) training.Esvironmental Assessment Category B.

To be determined 50.0 Public Enterprise Reform - The project To be determined. Project preparation under(IDA) will provide support to enabl, the way.

Government to define and initiateImplementation of a program for publicenterprise reform and divestiture.Environmental Assessment Catesorv C.

Ministry of Energy 82.5 (R) Calub Energy Development - To supply Consulting services will Appraisal mission hasand Mines (IDA) liquified petroleum gas (LPG), and other be required. returned from the field.

petroleum products. Interfuel REgistration of a share-substitution component to replace company to operate thedomestic use of wood fuels with LPG, gas deposit is completed.thus mitigating negative environmental Negotiations scheduled toimpact of deforestation. Contribution begin on December 15,to Region V Regional Development by 1993.studying installation of electrificationline to regional capital. providinglocal supply of petroloum products forenergy and transportation sectors,rehabilitating of Earar-Shelabo Road(600 km), and extending CommunityDevelopment Fund to local communities inthe project area. Social actionsprogram component to diversify incomesource and activities of poor women inurban centers engaged in illegalcutting, transport and trade offuelwood. Environmental AssessmentCateaorv A.

Ethiopian Seed 40.0 (R) National Seeds - Would reinforce To be determined. In view of changesCorporation (IDA) capability of national research system proposed by the

to provide adequate breeder seeds of Government and elapsedimproved varieties; improve capacity to time, re-Appraisal hasproduce high quality seed; stimulate been proposed to thedemand for improved seed through Governmnt. Responseimprovements and promotion; and create awaited from Government.an enabling institutional and policyframework to promote the evolution ofthe industry and promote private sectorparticipation. Environmental AssessmentCatetory B.

Ministry of 150.0 (R) Peasant Coffee Development - The Consultants will be Project has been droppedCoffee, Tea and (IDA) project would strengthen government required. from the lending program.State Farm support services for food and coffee Further reporting will beDevelopment production in the major coffee producing discontinued.

areas. Support would also be given toexpanding washed coffee primaryprocessing factories, rehabilitatingcoffee bulleries and improving exportprocessing facilities. EnvironmentalAsseasment Category B.

-~~~~~~~~~~~~~~~~ 11

Member Country, Amount &Ielementing Probable Stage of Procesaing andAgency Lender 2 Project Consulting Services Action on Procurement 4

To be det-rmined 15.0 (R) Agricultural Services - Consulting services may A November 1993 mission(Bank) Institutional strengthening of the be required for has confirmed that

Ministry of Agriculture's capacity for preparation, project preparationSector Menagemens. Strengthening of tha should move forward. Theresearch and *xtension program, for next mission foragriculture uslng the priority rone preparation of IEPS isapproach and limited rural schaeduled for February/infrastructure. Environmental March 1994.Assessment Cateaorv C.

Office of tho 3.0 Environmental Management Capacity To be determLned. Negotiations tentativelyPresident (IDA) Building - The project will provlde scheduled for February

support for the development of the 1994.national capacity for environmentalplanning and management, and theinstitutLonal development of theNational Environmental Agency.Environmental Assessment CateRorV C.

Office of the 10.0 (R) PublLc Works and Capacity Building - To be determined. Approved by the ExecutiveProeident (IDA) Project seeks to fight unemployment Directors on December 14,

through small labor-intensive public 1993.works; reform and streamline procurement A PPP was approved onprocedures for contract managements and January 4, 1993 forbuild capacity of local engineering and US$600,000.construction firms. Total project costix US$10.0 million. EnvironmentalAssessment Categorv B.

Ministry of 12.0 (R) Economic Management SECAL - The Consulting services will Appraisal missionFinance (IDA) sector adjustment credit would support be required. tentatively scheduled for

the Government's program for sustained March 1994.development with emphasis oninstitution-building. EnvironmentalAssessment Category U.

Gambia Port 8.0 (R) Banjul Port III - Modernization and To be determined. Appraisal missionAuthority (IDA) extension of Banjul's port facilities, scheduled for February

Total project cost is US$28.0 million. 1994.Environmental Assessment Category A. A PPF was approved on

April 12, 1993 forUS$300,000.A second PPF was approvedOctober 8, 1993 forUS$300,000.

Ministry of 10.0 Urban Environment - Project would: To be determined. Project underFinance (IDA) improve living conditions through preparation.

extension of infrastructure network and A PPP of US$600,000 warin sanitation; strengthen principal approved on September 30,institutions in the urban sector and 1992.operationalize the new enablinglegislation and regulation to facilitateadministration of land and housingdevelopment; and strengthen key tourisminstitutions, etc. Total project costis US$23.0 million. EnvironmentalAssessment Cateorv A.

- 12 -

Member Country, Amount LImplementing Probable Stage of Processing andAgency Lender I Project ' Consulting Services Action on Procurement

To be determined 65.0 (R) Financial Sector Adjustment - Consulting services will Preparation under way.(IDA) Continuation of the strengthening and be required for

deepening of the non-Bank financial implementing technicalsector vith due consideration for policy assistance component.implications of deregulation anddivestiture of state-owned financialentities. Project would also include atechnical assistance component.Environmental Assessment CatesorY C.

Hinerals 16.0 Small-Scale Mining/Mining Environment - Consulting services will Preparation missionComaission (IDA) The project will consist of components continue with bilateral completed November 15,

to improve small-scale mining, assistance under BGR 1993. Projectstrengthening capabilities of mining (Germany) and funding preparation under wayagencies, and support for endeavors to provided by Policy and with bilateral assistancestudy and address sectoral environmental Human Resources under BC.issues. Environmental Assessment Development (PHRD)Category B. Japanese Grant.

Ministry of 55.0 (R) Private Sector Adjustment (PSAC) - Need for consultants not Project processing underFinance and (IDA) This is the fourth structural adjustment yet determined, vay. Pre-appraisalEconomic Planning credit aimed at promoting private sector completed in December

dovelopment. Environmental Assessment 1993. Appraisal missionCategory: To Be Determined, scheduled for nd

February 1994.

Divestiture 50.0 Public Enterprise/Privatization - Need for consultants not Preparation missionImplemntation (IDA) Institutional and policy reforms to yet determined, scheduled for FebruaryCocmittee improve performance of the public 1994. Appraisal mission

enterprise sector privatization. tentatively scheduled forEnvironmental Asaessment Catesory C. May 1994.

Volt& River 100.0 (R) Thermal - Project will focus on the Consulting services will Appraisal was carried outAuthority (VRA) (IDA) building of a plant near the city of be required for: in July 1993. Appraisal

TakoradL. The plant will be combined (a) proJect supervisions report under preparation.cycle with an installed capacity of and (b) provision ofapproximately 300 MW produced by two operation andcombustion turbine generators and one maintenance onsteam turbine generator, each with a performance basis forcapacity of approximately 100 MW. The the completed powerplant will use light crude as fuel. A plant.switchyard nd transmission lines are tobe constructed to deliver power todistribution and load centers.Environmental Assessment Cate-ory A

To be determined 23.0 Private Sector II - Project is an Consulting servlc-s will Projoet preparation under(IDA) investment credit with a line of credit be required under the way.

and technical asistance components. It technical asaistancewill address private sector productivity component.and technology needs as well asindustrial infrastructure requirements.Technical assistance will focus oninstitutional and capacity building intechnology and judicial sectorupgrading. Environmental AssessmentCatecorv: To Be Determined.

- 13 -

Xember Country, Amount &ZIpleasnting Probable Stage of Processing andA4ecy Lender Project s Consulting Services Action on Procure mnt 4

(Cont'd)

Ministry of Food 15.0 (R) Fisheries Sector - Project would To be determined. Project underand Agriculture (IDA) include: (a) stock assessment, preparation. UA0/CP snd

preparation of management plans, the Government willsurvaillance, and monitoring of marine prepare the projet.and inland fisharies resources (b) strengthening of research andextension in culture fLsheriess(c) strengthening of community-basedmanagement of fish resources in inlandareas; and (d) building institutionalcapacity. Environmental AssessmentCategory: To Be Determined.

MiaLstry of 35.0 (R) Vocational Education - Development To be determined. Pre-appraisal isLonEducatLon/MinLstry (IDA) and strengthening of central scheduled for Februaryof Xobilliation institutions responsible for vocational 1994.end Productivity training, especially the National

Coordinating Committee for TechnicalVocational Training (NACVET)tregistration and data gathering re: theinformal sector and training.Environmental Assessment Cateaory C.

MniLstry of 20.0 (R) Agrleultural Sector Investment - The Consulting services for NegotiatLons coopleted.Agriculture (MDA) project would assist local authorities small-scale rural works Approved by th Executive

and rural associatiOns in improving wLll be required during Directors on December 14,their capacity to prepare, implement and implmentation. 1993.manage rural infrastructure investments.Environmental Assessment Cateaorv B.

Ghana Water and 37.0 Rural Water - To Lmprove access to rural Consultlng servlces have Appraisal completed.s6w-rag (IDA) water supply and sanitation through been arranged to assist Negotiations tentativelyCorporation rehabilitation/construction of in preparation. scheduled for January 15,

appropriate facilities and establishing 1994.community responsibility for operationand maintenance. EnvironmentalAssessment Categorv B.

wI

ENEICUI 50.0 (R) GCarafiri Hydroelectric (Power III) - Consulting services vill Project under(IDA) First phase of the Garafiri-Kaleta be required for preparation.

Complex on the Konkoure River, located engineering services,about 160 km northeast of Conakry, board of experts,75 MW, 260 Gwh. Project includes dam, technical assistance andpower station transmission lines, training.environmental protection andresettlement, as well as relatedengineering services, technicalassistance and training. EnvironmentalAssessment Cateaorv A.

To be determined 25.0 tR) Agrlculture Services - Project will Need for consultants not Pro-preparation(IDA) provide assistance to consolidation of yet determined, activities are completed

agriculture services. Environmental vith the lssuance of aAssessment Category: To Be Determined. background di-gnosis

document. They will bereviewed by FAO prior topreparation missionscheduled for Harch 1994.

Member Country, Amount &Implementing Probable Sta&e of Processin andAgency ' Lender Project ' Consulting Services Action on Procurement'

(Cont'd)

Ministera de 6.0 (R) ELgher Education Management - Consulting services wll. Appraisal missionl'Ens4egnsment (IDA) Development of institution-level be required. scheduled for JanuarylSuperigur at de La management capacity. The project would February 1994.Recherch- assist the Government in rationalizingScientifique higher education, end would consist of:

(a) institutional reorganizations (b) aninformation systems and (e) budgetaryprogramming nd monitoring.Environmental Assessment Catesory C.

Ministry of Pre- 46.0 Equity and School Improvemant - This is Local team for field Preparation under way.University (IDA) a follow up to the Education Sector researchi educationEducation Adjustment Credit. Proj3et vill specialists to be

continue reforms in budgeting and determined.financial management, vith addedemphasis on school-level activities toimprove the quality of student learning.Girls' participation in schooling willbe a key focus of the project.Environmental Assessment Cate-orv C.

Minister. de 27.0 (R) Mining/Mineral - Support for sector Consulting services may Preparation under way.Reasource (Bank) development and improved economic be required for projectNaturelle Mt de 2S.0 management in mining and mineral sector, implementation.l'nvironnement (IDA) Special emphasis will be on private(MRHI) sector role and supporting government

policies. Environmental AssessmentCatecorv: To Be Determined.

Ministry of 20.0 (k) Prograssn d'Appui a la Gastion de Consulting services vill Pre-appraisal missionPlanning and (IDA) lEconomique Nationals (PACE) (formerly be required for project completed October 1993.Econom- National Programme d'Appui a la Gestion preparation.

de l'Economique (PAGE)) - Maintaining&ad deepening the momentum of theprocess of institutional reforns underPAGE I and PAGE II. Strengtheningeconomic management capacity.Environmental Assessment Categorv C.

Central Bank 20.0 Financial Sector - Restructuring of Consulting services will Pre-appraisal completed.(IDA) commercial banking and insurance sectors be required during the Appraisal mission

and strengthening of banking supervislon final stages of currently in the field.and credit policy. Environment4l preparation andAssessment Cateory C implementation of

project.

- 15 -

Membor Country, Amount &Implementing Probable Stage of Processing andAgency Leader I Project Consulting Services Action on Procurement 4

(Cont'd)

Ministry of 25.0 Rural Resources Management - Management to be determined. Appraisal issionAgriculture and (IDA) would seek to improve the protection and scheduled for May 24,Animal Resources management of four forest reserves in 1994.(MARA) the Forest Region and of non-reserve dry (Cofina cing by E£W

forest in Maritime Guinea, by means of tFrankfurt)).actions inside the forests as well as byland rights securenent end ruraldevelopment in the buffer zones aroundthe forests. The land rights work willalso be done in the other Regions. Onthe central level, the project would setup en environmental information system,involving the mapping agency (ITC), thetechnical bureau of the DirectionNationale des Forests *t Chasse (DNFAC),and the Department of Environment.Proj-et will be in operation forapproximately four years. Total projectcost is approximately US$28.6 million.Environmental Assessment Categorv A.

Ministry of Land 26.0 Urban Environment: Conakry Sanitation - Preparatory studies Preparation completed.D-velopment (IDA) To improve the physical and economic financed by Japan ee Pre-appraisal mission

*nvironment of urban centers; to Grant, which was signed tentatively scheduled forstrengthen local government s capacity on February 4, 1992, January 1994.to manage urban services. and to under way.increase service delivery through theirtransfer to private operators, part ofthe program of targeted interventions.Environmental Assessment Categorv B.

Ministry of Public 25.0 (R) Health and Nutrition Sector II - Consultant preparation Negotiations completed.E-ealth and (IDA) Policy-based operation focussing on work under way. Board presentationPopulation strengthening investment and recurrent scheduled for

budget planning, human resources February 22. 1994.management, renovating depletedinfrastructure and strengtheningpriority health programsdecentralization. EnvironmentalAssessment Category C.

Ministry of Public 30.0 (R) Road Sector Management - Selection of consultants Appraisal completed inWorks (IDA) (a) Priority urban infrastructure for technical assistance July 1992. Negotiations

investments in Conakry and secondary and enginearing studies scheduled for Mharch 1994.cities. (b) a tranch. of additional road will start soon.upgrading as defined in the long-termroad development plant and (c) improvingurban management and environment,including road safety and trafficmanagement. Environmental AssessmentCateeorv B.

- 16 -

Member Country, Amount &Implementing Probable Stage of Processing andAency Lender Project Consulting Services Action on Procuremnt 4

Ministry of Public 25.0 (R) Urban/Water and Sanitation - Project Need for consultants not Project underWorks (IDA) will provide a reliable and potable yet determined. preparation.

water supply and sewerage system to thecity of Bissau, and establish anorganization to manage, operate andmaintain a water supply, drainage andsanitation system. Will also providenecessary technical assistance,equipment, vehicles and offices for thenow entity. The system would includethe infrastructure to expand. Totalproject cost is US$50.0 million.Environmental Assessment Cate2orv ToBe Determined.

Ministry of 31.8 SAC III - to further policy reforms To be determined. Project underEconomy and (IDA) being taken under SAC II. Environmental preparation.Finance Aisessment Cateaorv U.

Ministry of Rural 8.0 (R) Agricultural Land and Environmental Consultants will be Negotiations scheduledDevelopment and (IDA) Management - Project would lay needed for for February i994.Agriculture foundation for improved management of implementation,

natural resources to promote sustainable estimated atagriculture. Components would be; 540 staffweeks.(a) land-use and land capabilitystudiess (b) a pilot program ofcoemhnity-based resource managementi(c) preparation of forest inventoriesand management plansi and(d) establishment of a NationalGeographic and Cadastre Institute; and(e) strengthening a NationalEnvironmental Council. Total projectcost estimated at US$9.0 million.Environmental Assessment Categorv A.

Kenya Power and 100.0 (R) Energy Sector - Project will finance Consulting services vill Pre-appraisal missionLighting Company (IDA) a time-slice of investment in the power be required. vill take place in early

and petroleum sub-sector in conjunction 1994, subject to thewith energy sector policy reform. Government submitting aEnvironmental Assessment Category: To policy reform proposal.Be Determined.

Ministry of Public 95.0 (R) Highway Sector III - Project To be determined. Project preparationWorks (IDA) description is to be determined. mission tentatively

Precise composition of project will be scheduled for Januarydetermined once overall priorities for 1994.the sector have boen established underthe Government's strategic plan.Environmental Assessment Cateaory: ToBU Determined.

- 17 -

Member Country, Amount &Implementing Probable St-ge of Proessing ndAgency Lander 2 Project I Consulting ServiceS Action on Procurement

(Cont'd)

Ministry of Local 80.0 (R) Urban Transport - The project will Consulting services wvli Appraisal mlssionGovernment (IDA) includs: (a) a program of road be required. completed. Post

rehabilitation and the establishment of appraisal will bea maintenance capacity (ineluding the required for late Januarypurchase of equipment). (b) traffic 1994.management improvementsi Cc) construc-tion of mLssing links and improvement inthe road networks (d) improvements inparking control and reviewi and(a) improvements In travel condltionsfor public transportation passengers andpedestrians. Envlronnmntal AssessmentCateory B.

Ministry of 120 .0 Structural Adjustment - The project is ConsultLng services vill Project is still in earlyFinance (IDA) expected to be an adjustment operation be requlred for civil stage of preparation.

in which balance of payments support service reform,wlll be provlded in two tranche against modifications toimplementation of key reforms in tho regulatory/legislativeregulatory frameork for private sector framework, and forenterprises, public enterprise reform, privatization.and the clvll service. EnvironmentalAssessment Category V.

Kenya Ports 72.0 Transport Corridor - To rehabilitate Consultants have been Appraisal missLonAuthority (XPA), (IDA) container berths, additional container assigned five PPF completed. PostKenya Railways handling equipment, construction of studies. Consulting appraisal missionCorporation container freight station, rehabilita- services will be scheduled for late(Department of tion of shunting locomotives, new required during January 1994.Customs) mainline locomotives, improvements to RR implementation.

communications, and customs and transitreform. Also, management support to RPAand XRC, and inAtitutional program.Environmental Assessment Catesory B.

Ministry of 40.0 Dairy Development - Project would To be determined. Project underAgriculture (IDA) facilitate implementation of policy, preparation.

legislative and structural reforms forstrengthening the industry and forsustainable growth. EnvironmentalAssessment Catesorv B.

Ministry of About Nutrition - The project would develop Consultants will be Preparation missionHealth, Mlnlstry 20.0 and test interventions to reduce required and are likely scheduled for Februaryof Planning (IDA) malnutrition and would support programs to be financed under the 1994.

to combat deficiency diseases. Health RehabilitationEnvironmental Assessment Category: To Project.Be Determined,

-~~~~~~~~~~~~~~~-1

Member Country, Amount sImplementing Probable Stage of Procesingt ndAgency Lender Project Consulting Services Action on Procurement

Ministry of 11.0 Privatization/Restructuring - Project Five million dollars in Appraisal report beingFinance (IDA) would provide: (a) technical assistance consulting services over prepared.

(i) for negotiation of the sale of five years will bespecific parastatals; (ii) support the provided.privatization unit which would overseethe full privatization effort;(iii) support the capital marketdevelopment; (b) training for(i) entrepreneurs who would take overprivatized government services, And(it) improved technical and managementskills of the staff of privatizedcompanies. Expansion of the courtsystem and rationalization of legalframework necessary to supportimplem ntation of commercial law.Environmental Assessment Catexorv C.

Ministry of 23.0 Infrastructure Maintenance - To prepare To be determined. Project being identified.Planning (IDA) programs for rehabilitating and

maintaining roads and other infrastruc-ture, and strengthening long-termplanning of infrastructuro investments.Selected rehabilitationlinvestment willa.so be included. EnvironmentalAssessment Categorv B.

Ministry of 10.0 Public Sector Financial Management - Consulting services will Appraisal report underFinance (IDA) Expansion of pilot program for improvlng be required. preparation.

budgetary management and financial Negotiations tentativelyreporting in government, and strengthen- scheduled for end Januarying linkages between budgetary control 1994.and development planning. Training in (Cofinancing of aboutthe Government's new financial US$10 million is beingmanagement system will be emphasized. arranged.)Environmental Assessment CateRorV C.

Jivo Sy Raor 45.0 (R) Energy II - Institutional reform of Consulting services will Appraisal report underMalagasy (JIRAMA) (IDA) the power sector. Project also be required for preparation.(Agency of includes: (a) rehabilitation of the engineering and biddingMinistry of Energy Mandraka and Antelomita I and II documents for hydroand Mines) hydroplants; (b) rehabilitation and rehabilitation, project

extension of diesel power plants in management, master planisolated systems; (c) improvement of and design standards fordistribution substations; electrification, power(d) construction of transmission lines- sector reform, utility(e) rehabilitation and extensions of restructuring, anddistribution networks; energy efficiency and(f) electrification and new electric woodfuels programs.service connections; (g) disseminationof improved carbonization techniques andefficient stoves; and (h) technicalassistance and training. EnvironmentalAssessment CategorV B.

Ministry of Post 26.0 (R) Telecommunications Sector Consulting services may Appraisal report underand (IDA) Restructuring - Financing of investments be required for preparation.Telecommunications in the telecommunications sector and preparation of A PPF request has been

support for sectoral policy reforms and regulatory framework and approved.institutional assistance. Environmental privatization of theAssessment Category C. telecommunications

sector.

- 19 -

N mber Country, Amount &implementing Probable Stage of Processing andAgency £ Lender I Project Consulting Services Action on Procurement"

(Cont'd)

Directorate of 10.1 Agriculture Marketing Infrastructure - The services of Project underRural Works, (IDA) The project will support a international preparation.Ministry of decentralized, institutional mechanism consultants on shortAgriculture and for rehabilitation and maintenance of term basis will beRural Development marketing infrastructure in two required for

provinces, Antsiranana and Fianarantsoa. institutional building.Environmental Assessment Category B. Local consultants will

be used for engineeringworks.

To be determined 20.0 (R) Urban Works Pilot - The project will Consulting services vill Appraisal report under(IDA) introduce a private agency, acting as be required to complete preparation. Yellow

contract manager, to test mechanisms for the preparation cover review meetingidentification and execution of high (studies) and assist scheduled forpriority urban infrastructure works in public institutions and December 20, 1993.AntanAnarivo. The project will promote contractorslconsultantsgrass roots participation for works (training).identification, simplification ofcontract administration, and closerobservation of contractor/consultantperformance. These mechanisms willimprove the performance of both publicinfrastructure and domestic contractors/consultants. Environmental AssesamentCategory B.

To be determined 130.2 SAL I - To support the next phase of To be determined. Project under(IDA) adjustment reforms, including restoring preparation.

macroeconomic equilibrium, reform of theincentive systems, support of privatesector activities and exports,divestiture from public enterprises andimprovement of public sector management.Environmental Assessment Categorv U.

Ministry of 10.0 (R) Higher Education Sector (formerly Need for consultants not Project identified.Education (IDA) Education Sector) - The project will yet determined.

continue and intensify support for thesector reform package of First EducationSector Credit with components selectedfrom in-service training, bookproduction, administration, universityreform, and primary school construction.Environmental Assessment Categorvy ToBe Determined.

State Ministry for 12.0 Second Irrigation Rehabilitation - Consultants have been Appraisal report underAgriculture and (IDA) Following the completion of irrigation selected, preparation.Rural Development sector study, the project will support

the rehabilitation of existing mediumscale irrigation schemes, and ensure theinstitutional structure for sustainablemaintenance activities over future yearsby associating water users inmaintenance. Decentralization ofMiniastry of Agriculture to be supported.Environmental Assessment Categorv .

- 20 -

Nember Country, Amount &lmplemnting Probable Stage of Processing nd

Agency Lender 1 Project 3 Consulting Services Action on Procurement

(Cont d)

Ministry of 12.0 Agricultural Export Promotion - Will Short-term consultants Appraisal report under

Agriculture (IDA) assist producers, transformers and vill be required for preparation.exporters in prospecting markets, product d-velopment,developing new products or improving quality management andexisting ones, and investing in the market promotion.agro-industrial sector. EnvironmentalAssessment Categorv B.

Ministry of 32.3 Transport Sector - Assist in Consultants wvll be Appraisal report under

Transport (IDA) restructing of public enterprises in required for preparation.charge of rail transport and coastal restructuring ofshipping and to finance limited national railwayimprovement to air and rail transport company.infrastructure. EnvironmentalAssessment Category B

Ministry of About Education Sector Development - Project Need for eonsultants not Project components notEducation 50.0 will support the expansion and yet determined, yet identified.

(IDA) management of primary and basic Identificationeducation in underserved areas. Will tentatively planned foralso strengthen institutional capacity September 1994.for management of education and trainingservices. Environmental AssessmentCategory C.

Government of 40.0 Agricultural Diversification - Project Consulting services will Project underMalawi (IDA) will help improve policy and be required. preparation.

institutional constraints and supportessential investments which wouldpromote agricultural diversification.Environmental Asxessment Category B.

MLnistry of Works, 25.0 National Water Development - Project Water services sector Project preparation underWater Department (IDA) seeks to improve integrated development and asset valuation way.

of the sector and promote efficient studies are under waynationwide management and use of water. and due to be completedEnvironmental Assessment Cateeorv B. at end March 1994.

Ministry of 55.0 Trade and Distribution Adjustment - Consulting services will Project being identified.

Finance (IDA) Final phase of adjustment program with be required. (Cofinancing of aboutemphasis on rationalization of trade and US$70.0 million will bedistribution sectors and completion of required.)liberalization of domestic transport.Environmental Assessment Category U.

Ministry of 37.0 (R) Institutional Development II (ID II) Consulting services will Appraisal mission

Finance (IDA) - Project will continue the efforts be required. completed. Negotiationsbegun under ID I to strengthen scheduled for March 1994.Government capacity for economic andfinancial managemnt, and to support aprogram for improvement of a publicsector. Environmental AssessmentCategory C.

- 21 -

Member Country, Amount £Implerenting Probable Stage of Processing andAgency ' Lender 2 Project ' Consulting Services Action on Proaureent 4

To be determined 80.0 Urban III - Project seeks to- Need for consultants not Identification under way.(IDA) (a) increase revenue; (b) increas, yet determined.

efficiency of municipal expenditures:(c) create financial instruments toprovide housing finance. EnvironmentalAssessment Category: To Be Determined.

To be determined 20.0 Agro-processing and Trading Promotion - Consulting services will Project under(IDA) To enhance the value of Malian be required. preparation.

agricultural products, promote growth inthe industrial or artisanal sector byencouraging private investment in agro-processing and trading activities.Total project cost estimated atUS$25.0 million. EnvironmentalAssessment Category: To Be Determined.

Institut 20.0 (R) Asricultural Research - To Consulting services vill Approved by the ExecutivedEconomLe RurAle (IDA) strengthen crop, livastock, fcrestry, be required. Estimated Directors on December 16,(IER) and natural resource management research at 200 staffweeks. 1993.

nationwide. Total project cost (PAC, the Netherlands andestimated at USS111.7 million. USAID, Swiss DevelopmentEnvironmental Assessment Category C. Corporetion, UMP and

CIBA CEIGY Forndation arealready financing IER'sactivities.)

Ministry of 120 0 (R) Transport Sector - Would support Consultants will be Negotiations tentativelyTransport, (IDA) preparation of comprehensive three year required for preparing scheduled for latoMinistry of investment program focusing on the different project January 1994.Construction, maintenance of existing infrastructure componentsUrbanism and and improved management of sector (15 staffweeks).Housing parastatals, based on detailed action

plans. The problem of urban endinterurbenlinternational transport wouldbe addressed. Total project cost isUS$322.0 million. EnvironmentalAssessment Category B.

Ministry of 18.0 (R) Irrigation Promotion - Provision of Consultants will be Project underAgriculture, (IDA) technical and institutional support to required. Estimated at preparation. FinalLivestock end private investment In irrigated 200 staffweeks. preparation report wasEnvironsent agriculture. Total project cost issued by PAO in May

eatimated at US$10.0 million. 1993.Environmental Assessment Category B. A PPF has been processed

to fund preparationactivities through localconsultants.(Cofinancing will berequired. Possibly fromXfW and FED.)

To be determined 15.0 (R) Education Sector Strengthening - Consulting services will Appraisal scheduled for(IDA) Specific investment credit to continue be required. June 1994.

th expansion of primXry Oduction. (FAC cofinancingProject will target female and rural expected.)populations, and improve the quality ofboth primary and secondary education.Environmental Assessment Cateaory: ToBe Determined

- 22 -

Member Country, Amount &ilpleomnting Probable Stage of Processing andAgency I Lender $ Project Consulting Services Action on Procurement 4

(Cont'd)

Ministry of Rural 1.0 (R) Natural Resource Management - Consulting services will Preparation missionDevelopment (IDA) Project is a continuation of be requlred. scheduled for March 1994.

Agricultural SECAL I. Implementation ofreform in the area of lend reform, ruralcredit, irrigation management, foodsecurity and inastitutionalstrengthening. Environmental AssessmentCategory: To Be Determined.

To be determined 12.0 Financial and Private Sector Development Consulting services will Preparation is under way.To Be - The project would have two components: be required for each of (Cofinanctng may beDeter- (a) technical assistance for the banking the project components. sought from othermined sector restructuring; and (b) technical donors.)

assistance for the private sectordevelopment including reforming thelegal and regulatory framework, end thedevelopment of enterprise supportinstitutLons. Environmental AsnssmentC-tetosry C.

To be detezmiied 16.6 (R) Agricultural Services - Improvement ConsultLng services will Nesotiations completed.(IDA) of research and extension, possibly also be requlred. Estimated BOrd presentatlon

agricultural education nationwlde, at 150 staffwc-ks. scheduled for March 1994.Total project cost estimatod atUS$18.6 million. EnvironmentalAssossment Catesorv C.

To be determined 17.0 Irrigation Promotion - Development of Consultants will be Project preparation is(IDA) private irrLgation plus selected roqulred. Estimated at expected to take place

rehabilitation of publicly constructed 100 staffweeks. when all conditions forirrigation schemes. Total project cost release of agricultureestimated at US$40.0 miLlion. Socal second tranche haveEnvironmental Asxessment Catetorv A. been met.

(Cofinancing will berequired. Possibly fromXfW and FMD.)

free Port 20.0 tR) Port Development - Project to focus Consulting firms have A trust fund and PPFAuthority end (Bank) on: (a) policy adjustment to manage been invited to submit request have beenMauritius marine exlsting port with view to improve proposals for studies on approved for preparationAuthority quality of services and reduce handling port policies, review of studies.

tariffst (b) extension of port port master plan,facilities wlth two new berths to turn environmental assessmentMaurltius Into a hub-port to cater to and free portregional shipping needsl and development.(c) environment and safety protectionvithin port area. EnvironmentalAssessment Catesorv B.

Ministry of 8.0 (X) Technical Assistance To Enhance Consulting services will Appraisal missLon is InIndustry And (Bank) Competitiveness (formerly Technical be required for the field.Industrial Development TechniaLl AssLstance) - The asslstance ln developingTgchnology project aims at: (a) improving access infrastructure for

to world market information; quality standard and(b) strengthening the development of support for smell-scalestandards; and (c) improving financing industries.mechanisms for upgrading technology andstrengthening technLcal skllls.Environmental Assessment Catesory C.

- 23 -

Member Country, Amount &Implementing Probable Stage of Processing nd4gency Lender Project ' Consulting Servie-s Action on Procuremznt

(Cont'd)

Ministry of 20.0 (R) Higher and Technology Education - Need for consultants not Project to be identifiedEducation and (Bank) The project will assist the Government yet determined, in January 1994.Science, Hinistry in implementing tertiary educationof Manpower master plan particularly in science andResources technology, and in improving the quality

of the labor forco to enable the countryto sustsin a high technology and skillsintensive economy. EnvironmentalAssessment Catesorv C.

Government of 30.0 (R) Environmental Support - Expansion of Consulting services will Project underMosambiqu- (IDA) activities under first project to be required. preparation.

additional districts, as permitted bythe Rural Rehabilitation Project. Alsoincludes development of security, andmore intense development in the original40 districts. Environmental AssessmentCateeorv B.

Government of 100.0 IR) Rural Sector Adjustment - Project Consulting s-rvices will Initial EPS scheduled forMozambique (IDA) will develop policy reforms that will: be required. December 20, 1993.

(a) improve pricing and tradingenvironment, (b) increase agriculturaloutput and rural incomes (c) improvehousehold food security; and(iv) enhance export earnings.Environmental Assessment Cate-ary: ToBe Determined.

Government of 60.0 Agricultural Sector - Project will Consulting services will Project underMozambique (IDA) strengthen national extension servicos be required. preparation.

and research programs, and provideseasonal credit for the provision offarm inputs. Will also strengthenagricultural and geographicalinformation systems. EnvironmentalAssessment Category B.

Banco do 9.0 (R) Financial Sector Capacity Building - Consulting services will Memorandum of the4ocaibiquo (IDA) Training, studies end technical be required for Bank President being prepared.

assistance loan to support the financial trainers, monetarysector adjustment credit. Environmental policy, bankingAssessment Category C. supervision, and foreign

exchange management.

Empresa Nacional 25.0 Gas Engineering - Pre-development work Consulting services will Project underde Eidrocarbonetos (IDA) for Gas Export Project. Environmental be required for legal preparation.do Mocambique Assessment Cateeorv B. and contracting advico,

regulatory advice,engineering for projectdevelopment, financi ladvice, andenvironmental review.

Ministries of 153.0 (R) Second Road and Coastal Shipping Consulting servlces wlll Negotiations tentativelyConstruction, (IDA) (ROCS I1) - Project provides for the be required for scheduled for JanuaryTransport nd rehabilitation and maintenance of engineering, short-term 1994.Finance selected sections of the feeder end technical assistance and

primary road networks. Environmental supervision of civilAssessment Catetory B. works.

- 24 -

Member Country, Amount &Implementing Probable Stiti of Processing sodAgency Lander' Project Consulting Services Action on ProcuremAnt 4

(Cont'd)

Mlinitry of Health 75.0 Health II - Project will support health Consulting services vill Project under(IDA) services delivery in rural areas end be required. preparation. Appraisal

development of institutional capacity mission scheduled forincluding strengthening health program March 1994.ma-agement and planning, assistance andtraining snd implementation. Project

funds for: (a) rehabilitation of healthposts, health centers and ruralhospitals; (b) health manpover training;and (c) support for managemntimprovements at central and provinciallevels. Environmntal AssessmentCateaorv C.

Banco de 180.0 (R) Second Economic Recovery Moqambique Consulting services will Appraisal missionMboambiquel (IDA) (formcrly Nogambique Financial Sector be required in the areas tentatively scheduled forMinistry of Adjustment) - To provide balance of of informl credit, February 1994.Finance payments support for the financial and comercial banking, bank

enterprise sector reform program restructuring,including strengthening of the Central insurance, exchangseBank, development of monetary policy control, bankinginstruments of control, restructuring of supervision and otherthe state owned comnercial banks, areas.development of competition in thebanking sector, and further enterpriseprivatization. Environmental AssessmentCategory C.

Ministers du 30.0 (R) Transport Sector II - Project will Need for consultants not Project underCoemerces, des (IDA) redirect public expenditures in road yet determined, preparation.Transports et du sector to maintenance, inerease userTouris.e cost recovery, and consolidate

institutional building achievements.Project will also finance a 3-yeartranche of investments and a maintenanceprogram. Total project cost isUS$193.5 million. EnvironmentalAssexament Category B.

Miniltry of Public 10.0 (R) Health Development (form rly Need for consultants not Identification under way.Health (IDA) Sexually Tranamitted Disease) - The yet determined.

project will support implementation ofthe Government's AIDS preventionprograms. Environmental AssessmentCategory C.

Niset Agency for 10.2 Pilot Private Irrigation - Development Consultants will be Negotiations bsceduledPrivate Irrigation (IDA) of private irrigation including: required. Estimated at for February 1994.Development (a) small-scale, by low-lift pumping 38 staffweeks. (Cofinancing with CCCI(AXP?P) from shallow aquifers; and (b) medium- (Prance).)

scale, by pumping from the Niger River.Total project cost estimated atUS$13.5 million. EnvironmentalAssessment Category S.

- 25 -

Xember Country, Amount &Implementing Probable Stage of Processing andAgency Lender ' Project ' Consulting ServiLes Action on Procurement"

(Cont'd)

Ministry of Plan 20.0 Municipal Infrastructure - The project Consultant will be Project under(IDA) will str.ngthen technical capabilities required for project preparation.

of municipalities and their ability to preparation, technicalmobilize local resources, increase assistance for designproductivlty of self-employed artisans and supervision ofand micro-enterprises. Total project vorks, training and forcost is US$50.0 million. Environmental studies.Assessment Categorv B.

Minister. do 25.0 Education III - Continued support to Consultants will be Project appraisedl'Sducation (IDA) expand and improve quality of primary required during December 1990.Nationale education. Environmental Assessment implementation. Reappraisal to be

Category C. scheduled in light ofagreement with newGovernment on policypackage.(Possibility of co-financing from CIDA, FAC,Germany, the Netherlandsand Norway.)

Ministere de 15.0 CR) Natural Resource Manag-emnt - Consultants will be Appraisal missionl'Agrlculture et (IDA) Finance a wide range of natural required. Estimated at tentatively scheduled forde l'Elevage resources msnagement activities at 400 staffw-eks. March 1994.

village, departmental and national (Cofinancing *xpectedlevels. This will include field from Norway, andoperations, training, data collection Germany.)and analysis and institutionaldevelopment. Total project costestimated at US$27.0 million. Thewroiect has been asecificallv designedto have a stronrlv oositiveenvironmental inact. EnvironmentalAssessment Categorv C.

Rlvers State 50.0 Coastal Zone Management - Program to Need for consultants not IEPS scheduled forZnvironmental (IDA) assist the State Environmental yet determined. December 30, 1993.Protection Agency Protection Agency and other related

institutions in* (a) controlling thepollution in Rivers StatelCb) developing a management plan toconserve the mangroves; andCc) developing an environmentaleducation program in the state.Epvironmental Assessment Catezorv A.

To be determined 10.0 Regional Gas Pipeline - Project would Need for consultants not Identification under way.(Bank) potentially support technical yet determined.

feasibility and economic studies of aproposed West African regional gaspipeline from Nigeria to Ghana.Environmental Assessment Category C.

- 26 -

Hember CountSy, Amount aIcplementing Probable Stage of Processing a"Agency I Lender 2 Project Consulting Services Action on Procuremeat

-iA:FR(Cont d)

Federal Ministry 50.0 Nigeria National STD Prevention - Local and internationa Pro-appraisal miesionof Health (IDA) Support for the programs to control the consultants will be scheduled for January

spread of sexually transmitted diseases, required to determine 1994.EIV and AIDS. The project would focus baseline behaviors andon public education and promotion of prevalence of disease;behavior change, improved surveillance assist vwth strategyand case maragement, institutional formulation, monitoringsupport, and operational research. nd evaluation, and toEnvironmental Assessment Categorv C. conduct studies.

Federal Mlnistry 100.0 Livestock Sector - Development and To be determined. Project under preparationof Agriculture and (IDA) strengthening of federal and state by the Government andNatural Resources institutions responsible for livestock: FADICP.

privetization of livestock healthservices; and development of the dairyindustry and breeding livestock.Project will also improv: (a) naturaland planted pastures and livestockmarketing (b) staff trainings and(c) research, studies and monitoring thenatural resource base. EnvironmentalAssessment Catesory B.

Federal Ministry 50.0 (R) Rural Markets and Infrastructure Government selected Appraisal mission plannedof Agriculture and (IDA) (formerly Rural Marketing) - Project local consultants to for February/March 1994.Natural Resources aims to: (a) stimulate the development vork with FAOICP for

of road-to-market linkages; and project preparation.(b) develop the capacity of villagecommunities and local agencies to engagemore effectively in the marketing oftheir produce. It would comprise:(a) upgrading of coemon marketinfrastructure (drainage, sanitation,market access roads, parkingfacilities)l (b) rehabilitation andupgrading of 4,500 kilometers of feederroads, (c) promotion of communityinvestments in vater supply, villageaccess roads, and small-scale agro-processing and other low cost marketinginitiatives; (d) strengtheningmanagement of federal, state and localinstitutionst and (e) building communityoutreach programs in ADPs and privateorganizations. Environmental AssessmentCateaorv B.

Yederal Ministry 75.0 Second National Agricultural Technology Project preparation will Preparation to beof Agriculture, (IDA) Support - Project seeks to: (a) promote be undertaken by a completed by FebruaryState and Local food security, incom generation and Nigerian Government 1994.Covernments rural employment by strengthening Agency with the

extension and on-fa-rm adaptive research, assistance of local andfisheries end other smallholder oriented external consultants.services, (b) strengthening agriculturesector planning, project preparation andmonitoring function at the federal andstate levels, and (c) encouragement ofinvolvement of rural communityorganizations in project planning andimplementation. EnvironmentalAssessment Category: To Be Determined.

- 27 -

Member Country, Amount &Irplementing Probable stage of Processing andAgncy Lender Project Consulting Services Action on Procurement 4

(Cont'd)

Federal Ministry 50.0 (R) Multi-State Water II - The project N-ed for consultants not Project preparation underof Water Resources (IDA) will seek to improve the delivery of yet determined, way. Pre-appraisaland Rural water services in Abia and Imo States mission planned forD-velopment by: rehabilitating and expanding supply January 1994.

and distribution facilities: andprcmoting private sector and communityparticipation. Environmental AssessmentCatesorY B.

Feder-l Ministry 20.0 (R) Irrigation Development - The project Consulting services will Project preparation wasof Agriculture (IDA) vill assist in: (a) expanding the be required for undertaken by FAO/CP and

program of small-scale irrigation technical assistance. the Government. Pre-initiated under the Fadama Development appraisal missionProjecti (b) rehabilitation of the amo completed on December 6,River Phase I irrigation scheme; and 1993. Appraisal mission(c) strengthening of local capacity to scheduled for May/Juneplan, design, end implement sustainable 1994.irrigation schemes involving the privatesector in the ownership and management,end limiting public institutions topolicy and planning issues.Environmental Assessment Cateaory A.

To be determined 50.0 Nutrition - To support priority national To be determined. Project under(IDA) nutrition interventions (i.e. campaign preparation, but delayed

for exclusive breast feeding) in support due to lack of closure onof the national goal to reduce institutionalmalnutrition, especially among pre- arrangemeats.school children, and to pilot community-based nutrition programs in selectedlocal government areas. EnvironmentalAssessment Cateecrv C.

Ministry of 40.0 (R) Forestry III - Promotion of Minimal consultancy Project underAgriculture/ (IDA) sustainable multiple-use management of services wlll be needed preparation. AppraisalFederal forest reserves, communal and individual for developing forest mission scheduled forEnvironmental tree planting, participatory land and reserve management February 1994.Protection Agency forest resource man-gement, and plans.(FEPA) institutional development.

Environmental Assessment Ceteecrv A.

Nigeria National 100.0 (R) Escravos Flared Gas Reduction - Consulting services will Appraisal missionPetroleum (Bank) Project will reduce greenhouse gases be required for studies completed. NegotiationsCorporation (N"PC) emissions/global warming by reducing and technical scheduled for March 1994.

current flaring of natural gas. Project assistance. (A Global Environmentwill include: (a) an offshore gathering Facility (CEF) Grant hassystem; (b) an on shore compression been requested.)station# (c) a gas pipeline; (d) aprocessing plant; and (d) a liquified Procurement: Pre-petroleum gas (LPG) floating storage qualification biddingvessel. In addition, support will be documents have beenprovided for institutional and technical prepared and aredevelopment within NNPC and the available for certainMinistry. Environmental Assessment project components. ITTCatetory A has been issued for

others.

- 28 -

Yember Country, AMount &Implementing Probable Stage of Processing andAgency Lender 2 Project Consulting Services Action on Procuremnt 4

(Cont d)

Federal Ministry 100.0 Health System Fund II - Project seeks To be determintd. Project underof Health (IDA) tot (a) improve the primary and preparation.

secondary health care system throughrehabilitation of existing facilities;(b) establish a national healthequipment and repair systms and(c) improve health management andadministration at the federal, state andlocal goverrment levels. EnvironmentalAssessment Category C.

Federal Ministry 20.0 Junior Secondary Education - Support to To be determined. Appraisal missionof Education (IDA) Government ts education devolopment completed. Negotiations

program for: (a) upgrading the quality scheduled for Februaryof secondary education; (b) moving 1994.towards universal basic education;(e) improving resource allocation,distribution and use; (d) strengtheningplanning and managemnt; and(e) Institutional development.Environmental Assessment Categorv C.

Ministry of Works 50 0 (R) Lagos Urban Transport - To improve Consulting services have Project preparation underand Transport (Bank) supply and productivity of urban been secured, vay. Pre-4ppraisal(Lagos State 25.0 transport. Project would support; mission postponed toGovernment) (IDA) (a) improvements in efficieney of March 1994.

transport infrastructure throughpriority road maintenance andrehabilitation, and traffic managementand traffic flows enforcement;(b) facilitate integration of urbantransport elements and reduce trafficcongestiont and (c) supportinstitutional reforms and human resourcedevelopment. Evironmental AssessmentCateeor A.

Nigerian Railway 100.0 (R) Railways - The main objectives of Consulting services vill Appraisal completed.Corporation (Bank) the project are to support the be required. Negotiations scheduled

reorsanizational reform of NRC and to for January 31, 1994.finance a rehabilitation and commer-cialization program (locomotives,wagons, track, telecommunications,workshops). The project will supportthe commercialization program including-financial restructuring, andimprovements in its organization,corporate planning, and operationalcapabilities. Environmental AssessmentCateaorv B.

National Electrie 150.0 Power VIII - Rehabilitation of Consultants will be The project was appraisedPoawr Authority (Bank) generation, (KAINJI Hydroelectric Power required, in the Fall 1991, and

Station), transmission and distribution needs to be reappraised.facilLties. Expansion of transmissionand distribution network. EnvironmentalAssessment Category S.

- 29 -

Membor Country, Amount -Impleenting Probable Stage of Processing andAgency" Lwnder t Project Consulting Services Action on Procurement 4

Ministry of 22.8 (R) Second Education Sector - The Consulting services will Pre-appr-is-l missionPrimary and (IDA) project will be a follov-up to the First be required. scheduled for March 1994.Secondary Education Sector Credit, and will helpEducation in: (a) restructuring of secondary(MINEPRISEC) education, (b) increasing access and

equity, including access of females tosecondary education, (e) encouraging thedevelopment of private schools; and(d) improving the quality of education.Environmental Assessment Categorv C.

Ministry of Health 34.8 Population, Health and Nutrition IX - Consulttng services vill Project being identified.({DA) Sectoral operation aimed at: be required. A PPP advance of

(a) improving the efficiency of health US$330,000 was approedsystems (both public and private) on August S, 1993.including sanitary faciliti-es(b) establishing a coordinated,multisectoral response to populationgrowth and density; and (c) implementingthe national food security strategy.Environmental Assessment Category: ToBe Determined.

Ministry of Health 15.0 (R) Pharmaceutical Sector (formerly Drug One consulting firm has Board presentation(IDA) Sector Rehabilitation) - Project seeks assisted the Government scheduled for March 15,

to: (a) make essential drugs physically in preparing all project 1994.and financially accessible to the components.majority of the population: (b) increasethe efficiency of the drug supply anddistribution; and (c) improve thequality of drug prescriptions and use.Environmental Assessment Category C.

Central Bank, 12.0 (R) Private Sector Development - Will Local end international Approved by the ExecutiveMinistry of (IDA) provide funds to finance; (a) private consulting servLces will Directors on September 9,Comerce and investment through eligible financial be required in the 1993. Credit vas signedIndustry (MCI), intermediaries via an APEX institutions folloving fields: on November 8, 1993.Ministry of Public and (b) technical assistance to private (C) training for benksWorks, Banque entrepreneurs. Environmental Assessment (credit managemnt) endNationale Rwand- Category B. businesst Cb) policy(BNR) reforms (legal and

regulatory reforms),export promotions(c) private businessassistance accounting,project preparation,restructuring andmarketing.

MiListry of 15.0 Agricultural Research Ir - Follow up Consulting services will Approved by the ExecutiveAgriculture, (IDA) *ffort to support implementation of be required for Directors on October 14,Institut des national agricultural research program. establiAhment of a Human 1993.Seinces Strengthening of research, extensLon Resource DevelopmentAgronomiques linkages, and institutional reform. Plan, and research(ISAR) Total project cost is US$36.5 million. programming and

Environmental Assessment Catexorv B auditing.

- 30 -

Membor Country, Amount Implementing Probable Stage of Prooessing and4gency Lender2 Project I Conulting Services Action on Procuremnt 4

(Cont d)

Ministries of 51.9 Asricultural Sector Adjustment - Will Need for consultants not Projeat underPlan, Agriculture (IDA) promote market integration and y-t determined. preparation.and Livestock, diversification of agro-exports. WillComoerce and also increase efficiency of agro-Industry processings iprove input supply and

rationalize the enabling environment foragro-industrial investment endproduction. Environmental AssessmentC&toeorv U.

Central lcak of 40.0 Financial Sector - Project would support Consulting services Project underRwanda, Ministry (IDA) a financil sector program end other expected to be financed preparation.of Finance policy reforms in the incentive and by the Swiss Gcovrnmnt.

regulatory frae3work to encourageprivate sector investment and xports.Enmvirpnmental Assessment Category C

PRIDC

Ministry of 1O.7 SAC III/Private Sector - Further policy To be determined. Identification under way.Economics and (IDA) reforms being taken under SAC II and SACFinance II in particular public enterprise

reform and private sector promotion.Environmental Assessment Category U

Ministere de *5.0 ighe-r Education - The project has two Consulting services will Project preparation underl'Education (IDA) components: (a) rehabilitation of be required. way.Nationals essential infrastructure at the

University of Dikar including financingof the xpanaion and renovation of theuniversity library, its equipment vithfurniture and medern communicationtechnology, renovationlreshaping ofbuilding facilities, the supply oflaboratory equipment and materials andthe provision of textbooks endscientific informations end(b) promotion of institutional reforms,which would include financing of thedevelopment end implementation ofmanagementinstitutional reforms, and asmall research fund. EnvironentalAssessment Catesory C.

To be deterzined 20.0 Technical and Vocational Training h-ed for consultants not Identification under way.(IDA) Restructuring - Project would focus on yet determined.

restructuring secondary Leveltechnicians and skilled workers trainingreducing duplication of facilities andprograms, and strengthening withmployers. Environmental Assessment

Catsor C.

- 31 -

M omber Country, Amount &Implementing Probable Stage of Processing ndAgency ' Lender I Project ConsultLng Services Action of Procures ent

tCont'd)

To be detcrmined 63.0 Transport II - Project will focus on: To be determined. Identification under vay.(IDA) (a) urban and national road

rehabilitation and maintenance;(b) urban transport planning ntdoperational improvementst (c) roadsafety, and (d) interregional transportfacilitation. Total project cost isUS$80.0 million. EnvironmentalAssessment Categorv: To Be Determined.

To be determined 35.0 Agricultural Services II - Project is a Consulting services of Project under(IDA) continuation of Agricultural Services I approximately preparation. Follow up

focussing on crop protection and 200 staffweeks will be project will be preparedagricultural education, in addition to required. based on outcom of mid-extension and functional literacy. term review ofTotal project cost estimated at Agricultural Services IUSS40.0 million. Enviroamental vhich has bean completed.Assessment Categorv C.

Ministry of 35.0 Urban IV - The project will finance To be dtermined. Project underFinance and Plan (IDA) civil works, goods and consultants to preparation.

execute its three main components: A PPF for US$700,000 ivs(a) institutional development, including approved on September 17,technical assistance, trainlng and 1993 to financa projectequipment; (b) physical investments, preparation.indluding public infrastructure andfacilities; and (c) project managementfor recurrent costs of projectimplementation. Total project cost isUSS59.O million. EnvironmentalAssessment Catesorv A.

To be determined 10.0 Private Sector Competitiveness Support Consultants will be Project under(IDA) Services - Project will include required. preparation.

technical assistance: (a) to privateenterprises and private sectorassociations: (b) including studies forreview of competitiveness policy issuesby joLnt private sector/Governmentgroup; (c) including studies for designof business law reforms, and relatedstrengthening of the judiciary.Environmental Assessment Categorv C.

Ministere du 20.0 Natural Resources Management - Promotion Consultants will be Project preparation onDeveloppement (IDA) of policy changes conducive to more required. Estimated at hold because ofRural, Ministere sustainable land use throughout the 100 staffweeks. insufficient Goveromentde la Protectlon country, and implementation of land use comitment.de la Nature, plans with village and herder (Cofinancing expectedMinister* des associations. Total project cost from CFD, FAC (France),Resources Animilcs estimated at US$30.0 million. Protect end with Norwmy.)

is specifically designed to have astronh nositive environmental impact.Environmental Assessment Categorv C.

Ministry of Rural 30.0 Agriculture SECAL - Deepen structural Consultants will be Appraisal missionDevelopment and (IDA) adjustment through further reforms in required. Estimated at scheduled for SeptemberSONACOS pricing policy, marketing and input 200 staffweeks.- 1994.

distribution, credit, natural resources (Cofinancing expectedmanagement and tenure, staff training with CCCE forand career development. Total project US$18.5 millions USAIDcost estimated at US$100.0 million, for US$20.0 million; EECEnvironmental Assessment Categorv U for US$25.0 million, and

KfW for US$11.5 million.)

- 32 -

Member Country, Amount &Implanting Probablo Ste of ProcssAn andAgency Londer ' Project ' Consulting Services Action on Procurement

(Cont d)

Ministry of Rural 30.0 Water II - A five year trench. of Feasibility studies are Project underDevelopment and (IDA) sector investment plan which will completed Consultants preparation.Hydraulics improve sector management, strengthen for detailed studis and (Cofiamcing will bo

financial discipline, reduce sector technical aasiatanco required.)dependence on the Govarraent budget, will be required afterstrengthen sewerage subaectot. improve appraisal.rural water supply operation andmaintenance, and limit water shortagesin the greater Dakar area. Totalproject cost estimated atUS$298.0 milLion. EnvironmentalAssessment CateaOry S.

Public Utilities 20.0 (R) MARE Integrated Water - The project To bo determined. Project underCorporation (IDA) will bring improvemnts in water preparation. Project

production and distribution for Mahe description to be updatedIsland. Environmental Asxessment after disacussion of theCatezorv B. Public Investment Program

(PIP) with theGCovrnmnt of Seychellesduring first quarter199A.

Department of 10.0 (R) Education IV - Project would support Consulting services have Pre-appraisal missionEducation (IDA) Goverment's overall education refom, bean arranged to assist scbsduled for Febrwary

particularly in the areas of: in preparation. 1994.(a) improving organization and deliveryof planning, monitoring and regulatoryservices; (b) improving the efficiencyand increasing the budgetary allocationto education: (c) balancing the supplyof and demand for education sectorpersonnals (d) enhancing the cost-effectiveness of pre-servics nd in-service teacher training;(e) strengthening the production,distribution and resupply of learningmaterialss (f) rehabilitating bulldings;and (g) providing technical equipment.Environmental Assessment CatemorV C.

Department of 15.0 (R) Health Sector - Project Would ConsultLng services will Pro-appraisal missionHealth and Social (IDA) support Government's medium-term health be rcqulred. scheduled for FebruaryServices plan, particularly in the areas of: 1994.

(a) instltutional development throughbetter managemnt, accountability andrationalization of health services;(b) repair and upgrading of prLmaryhealth care facilities;(c) establishmsnt of systems forphysical plan and health equipmentmanagementj (d) testing and establishingsustainable health financing mechanismswithin the context of the Government'soverall budgetary reform efforts; and(a) strengthening the current essentialdrugs program. Environmental AssessmentCatesory C.

- 33 -

Member Country, Amount IIWplemnting Probable Stage of Processing andAgency Lond 2 Project Consulting Services Action on Procurement 4

CCont d)

GUMA Valley Water 10.0 (R) Urban Water Supply (formerly Need for consultants not soagoproject preparationCoop ny (IDA) Water/Urban) - Rhbabilitationl/xpension yet dtorminad. under vay. Appraisal

of water upply in Freetown and mission tentativelyi.nstitutional strengthening of water scheduled for Februaryutility. Environmental Assessment 1994.Catezorr B.

To be determined 10.0 tR) Judicial System - The proposed Need for consultants not Projoet preparation tunder(IDA) project will address four main areas yet determined. war. Appraisal issilon

(a) rehabilitation of physLal tentatively scheduled forfacilities, (b) rehabilitation of March 1994.facilities for legal research and legalmaterials; te) upgrade of adminiatrativeprocedures and personnel skills; and(d) reform, modrniszation, andharmoniszation of substantive laws, rulesand procedures. EhvironmentalAssessment Cat*zory C.

To be detormined 40.0 Agricultural Services - Project would Need for consultants not Project identification to(IDA) involve improving dissemination of yet determined, still to be completed.

agrlcultural technology throughstrengthening extension and research,including its linkages with extonsionand *ucation. Environmental AssessmentCateaorvp To Be Determined

Ministry of 20.0 Urban DevelopMOnt - The project which is Approximately Appraisal report underHousing and Urban (Bank) aimd at increasing urban management US$8.0 million in preparation.Development efficiency and improving living consulting services will (Cofinancing is being

conditions of low income urban be provided over five sought for water andhouseholds, would include. (a) poliey years. sewerage component andand institutional reform (liX of project institution building.)costs), including legislatlve andregulatory reviews, instttutionalsupport and capacity buildLng (includingtraining, technical assistance andtwinning, and strengthening mortgagefinance sectorsi (b) rehabilltation andexpansLon of city roads and servicesC13Z)i (c) rehabilitation and expansionof the vater and sewerage network sCd) reticulation of residential sites(182)o and t-) provision of prtvatesector funded mortgages (26X).Environmental Assessment Category D.

Government of 125.0 CM) Songo Songo Ga Development - Consulting services vill Project underTanxanis, Ministry (IDA) Project includes installation of a gas bo roquired. prparation.of Water, Energy gathering system for about five vells, A PPJ to undertake anand Minerals construction of a gas procesing environmental assessmnt

facility a a 20 km offshore gas study, and a gaspipeline, a 220 km overland pipeline developmant andand a powr generation facility in programming study, hasDar-es-Salaam. Environmental Assessment been approved.

CatorvA.

- 34 -

Member Country, Amount tImplementing Probable Stage of Processing ndAgency 1 Lende: r Project Consulting Services Action on Proourerent 4

(Cont'd)

Ministry of 40.0 Agricultural Services - Agriculture with Nsod for consultants not Preparation under vay.Agriculture (InA) liberalixation of agriculture support yet determined. Preparation mission

markets (fertiliLzr, other scheduled for Februaryagrochemicals, tools, technology, etc.). 1994.Environmental Assessment Categorv .

Ministry of Water, 20.0 Mining Technical Assistance and Consulting service- will Project underEnergy and (IDA) Institutional Support - The project will be required for project preparation.Minerals assist the Government in designing and preparation and

implementing reforms to encourage implementation.private sector oriented minlngdevelopment. Environmental AssessmentCategorv S.

Bank of Tanzania To Be (R) Debt Reduction Program - A grant To be determined. Grant to assistDeter- from the Debt Reduction Facility for preparation approved bymined IDA-only countries will be sought to the Executive Directors(IDA) effect a discounted buy-back of external on October 13, 1993.

commercial debt outstanding. IDA grantfunds are likely to be supplemented bygrants from other donors. EnvironmentalAssessment Catezorvt To Be Determined.

Ministry of To Be Structural Adjustment - The project To be d-termined. Identification under way.Finance Deter- would support key policy reforms in the

mined financial sector, agriculture, the civil(IDA) service, the parastatal sector, and

prlvate sector development.Environmental Assessment Categorv U.

Ministry of Works 150.0 (R) Roads II - The project will cover: Technical assistance Appraisal mission(IDA) (a) upgrading, rehabilitation and will be required fora completed. Negotiations

periodic maintenance contracts for (a) construction tentatively scheduled fordefined high priority trunk, regional supervisions January 24, 1994.and essential district roads including (b) mana-ement andbridges and culvertal (b) a pilot rural institution buildingtravel and transport component at the advisory servicess anddistrict levels (c) technical (c) strengtheningassistancea and td) resurfacing of the overall transport sectorrunway at Kll anjaro International administration.Airport. Environmental AssessmentCategory D.

Ministry of 50.0 Private Sector (Enterprise) Consulting services will Project underFinance, Ministry (IDA) Development - To provide funds and be required for project preparation.of Industry and technical assistance for promotion and preparation andTrade, and Bank of development of privato enterprises. implementation.Tanzania Environmental Assessment Cateaorv B.

Minlstry of 125.0 (R) Public Sector Adjustment - To Consulting services for Board presentationFinLnce (IDA) support overall macro-economic reforms, implementation will be tentatively scheduled for

and to axsist in restructuring of the provided under parallel April 1994.parastatals sector, including public technical assistanceenterprise privatizations restructuring credit of the Publicand retrenchment of the civil service, Parastatal Reformand macro-economic adjustment. Project (PPRP).Environmental Assessment C.tetorv U.

- 35 -

Member Contry, Amount &IMplmentinSg Probable Stage of Processing andAgo-C V Lender I Project ' Consulting Services Action on Procurement 4

(Cont'd)

Office of the 80.0 (R) Urban Infrastructure Consultants have bee-n Preparation under way.Prime Xlaitet and (IDA) Rahabilitation - Rehabilitation, hired under ongoingFirst VLce maintenance, and selected expansion of Urban Sector Engineering Procurement; Request-President, the infrastructure stock in major urban Project. Contract for for-proposal for secondMinistry of Water areas. Envlroamental Assessment two engineering dxsign engineering design task

Cateilrg S. tasks currently being to be Snvited late 1993.negotiated.

Ministry of 100 0 Education Sector Development - The Consulting services will Identification will beEducation end (IDA) project will focus on reform measures to be required. undtrtaken in FY94-95.Culture the education sector to include

financing of education; teacherformation: management of the system: sndcurriculum and instructional materials.Environmental Assessment Category: ToBe Determined.

Pram Minister's 150.0 Hmumn Resources Development. - Consulting services will Identification will beOffice (IDA) Strengthening demand for social services be required. undertaken in FY94-95.

including health, nutrition, education,water eanitation, and family planningsand building up policy formulation andimplementation capacity of districtgovernments. Environmental AssessmentCategory C.

To be determined 20.0 (R) Forestry and Environment - The Need for consultants not Preparation to begin when(IDA) project would include: (a) research yet determined, political and economic

studies; (b) staff training programs and situation allows.investments to address problems ofresource depletion: (e) strengthening ofthe legal and institutional frameworkfor environmental protection; and(d) support for improved reservedmanagement. Environmental AssessmentCategory: To Be Determined.

Ministry of 25.0 (R) Lome Urban Development - Project is Consulting services will Negotiations tentativelyEquipment and (IDA) designed toz (a) improve sanitary and be required for project scheduled for FebruaryPosts and social conditions in high density areas: implementation. 1994.Telec-omunications (b) improve basic infrastructures to

support the functioning of Lome Urbanactivities; (a) generate employmentthrough labor-based techniques andcommunity participationt and (d) carryout several studies to design theappropriate reforms to be implemented inorder to strengthen sector institutionsand improve resource mobilization.Environmental Assessment Catetorv B.

- 36 -

Member Country, Amount &13Iplemnting Probable stage of Processing andAgency ' Lender a Project Consulting Services Action on Procureent '

To be determined 10.0 (N) Environxent Management - Project Need for consultants not Initial EPS about to be(IDA) vill focus on institutional capacity yet determined, conidered at the

building to enable the Government to Department level.formulatc policles, monitor and Project preparation just-implement measures to protect the beginning.envlronrent, and inltiate on a pllotbasis. environmental protectionmeasures. Envlronmental AssessmentCategory! To So Detetmined.

Ministry of To Be Institutional Capacity Building - Reed for consultants not IEPS to be submitted toFinance and Deter- Funding for technical assistance, civil yet determined. DMT by mid-December 1993.

Economic PlanaLng mined vorks, training, and cquipsent insupport of selected instLtutLonalstrengthening in public administration,organization, and the financlal sector.EnvLronmental Assessment Category C.

Ministry of Health 50.0 (R) Distrlct Health Services - The Consulting services are Preparation under vay.(IDA) project will support health pollcy being financed by the Appraisal miasion is

reform and will developmnt First Health Proj3ct and scheduled for April 1994.

ruralldistrict health services. bilateral donors.Environmental Assessment Catesorv: ToBe Daetrmlned.

Ministry of Health 50.0 () Sexually Transmitted DiseLaes Consulting servLces are Appraisal missaion(IDA) (STD)/AIDS - Project will support being finuaced by the completed. Yellow cover

efforts to reduce morbidity from First Health Project and staff appraisal reportsexually transmitted disaa-es (STD) and bilateral donors, under preparatlon.reduce BrV transmission. EnvironmentalAssessment Category: To Be Determintd.

Ministry of 13.5 (R) Cotton Subsector - To increase Cons ulting services will Yellow cover review

Commerce. Industry (IDA) smallholdor production and incomes, be required for project completed on December 6,and Cooperatives diversify agricultural exports, end implementation. 1993.

enhance privae- sector participation Inthe cotton aubsoctor through theliberalization of production, ginning,export marketing and input procurement.Environmental Assesment Category B.

Ministry of 80.0 (R) Second Structural Adjustment - Consulting srvices vill Yellow cover reviewFinance end (IDA) Project will support deepening of be required for completed onEconomic Planning reforms to accelerate private sector implementation. October 27, 1993.

development and enhance the contribution Negotiations to beof the public sector to growth and human completed by December 17,resources developmnt. Environmental 1993.Aaseasment Ctegory U.

Bank of Uganda 120 0 Financial Sector Adjustment II - The Consulting services vill Identification vill be

(IDA) proposed FSAC II would consolidate the be required. undartaken in FY95196.achievements of PSAC I end move towardsthe second phase of sector adjustment,wtth an enhanced program of policy andinstitutional reforms aimed at furtherdeepening, diversifying endstrengthening the financial sector.Environmentel Assessment Categorv U.

- 37-

Xember Country, Amount &Implementing Probable Stage of Processing andAgency Lender a Project Consulting S-rvices Action on Procuremtac

(Cantld)

Ministry of Trade 2 40.0 Export Promotion and Development - To be determined. Project identificationand Industry (IDA) Project will support industrial completed.

restructuring vith a focus on public endprivate enterprise development.Environmental Assessment Categorv: ToBe Determined

Xinistry of 40.0 (R) Small Towns Water end Sanitation - Consulting services Negotiations completedNatural Resources (IDA) Rehabilitation and n.v construction of required for design end November 5, 1993. Board

water supplies in 13 towns (IDA), with supervision, presentation scheduledcommunLty, participation. Also includes for February 8, 1994.sanitation and institutionalstrengthening. Environmental AssessmentCateeorv .

XinLatry of Works, 60.0 (R) Transport Rehabilitation - Project Twinning arrangements or Appraisal missionMinistry of Local (IDA) wouldi (a) assist in rehabilitation and consulting services will completed. NegotiationsGovernment, and maintenance of highways, (b) improve be required for scheduled for JanuaryUganda Railways rural feeder road accessibility. institutional 1994.Corporation tc) strengthen management and marine strengthening of MOWTC,

services of Uganda Railwayst and MOLC and URCs detailed(d) strengthen XOWTC's transport engineering of roads;planning capacity. Environmental supervision andAssessment C4tesorv D. preparing a road

maintenance program.

Government of 125.0 (R) Mining Financial Sector Adjustment Need for consultants not Project underZambia, Ministry (IDA) CIFSAC) (formerly Industrial and yet determined, preparation. Appraisalof Finance Financial Sector Adjustment (IFSAC)) - mission scheduled for

Sector adjustment credit focussing on June 15, 1994.reform of mining sector policy anddeepening and broadening the capitalmarket, and industrial incentives andfinancial scotor policies.Environmental sseasment Cate2oryv ToBe Determine4.

Ministry of Health 15.0 Population - The project would: NRed for consultants not Project delayed.(IDA) (a) assist the Government in the yet determined. Identificatlon will take

definition and initial implemntation of place late 1994.a sustainable programt (b) set up anumber of pilot family plannins clinicxln rural and urban areas; (c) providetraining to servic- providers. andtd) support IEC offorts aimed at familyplanning. Enviromental AssessmentCategory: To Be Determined.

-38

Member Country, Amount iImplementing Probable Stale of Proeossing and

Agency Lender' Project Consulting Sorvices Action on Procurement 4

(Cont d)

Tases, Pipolines, 30.0 (R) Petroleum Rehabilitation - Project Consulting services will Appraisal report under

Indeni Refinery (IDA) will include the following: be required for pipeline preparation.

end Zimoil (a) rehabilitation of Taxama OIl engineering supervision Negotiations tentativelyPipelines (b) energy efficiency measures and construction of schedulcd for Februaryat Indeni Refinery, (c) construction of refinery end bulk 1994.bulk petroleum handling facilitLes, and petroleum handling(d) institutional strengthening of facilities.petroleum supply companies.EnvironMental Assessment Cateaorv B.

Ministry of Ealth 20.0 Health Sector - Assist with Consulting services will Project under(IDA) Implementation of health sector reform, be required. preparation.

Environmental Assessment Cateory: ToBo Determined.

Ministry of 40.0 Agriculture Sector - The objective is to Consulting services will Project under

Agriculture (IDA) increase production of agricultural be required. preparation.exports in order to diversify the exportbase from the heavy dependence on themining sector. Environmental AssessmentCatesorv B.

Ministry of 150.0 (R) Economic and Social Adjustment Consultant services vill Appraisal missionFinance (IDA) (ESAC) - To extend end deepen the be sought. completed. Negotiations

Governments adjustment program by tentatively scheduled forproviding imported goods and services, mid-January 1994.particularly production inputs for (Cofinancing of aboutrecovery, end to accelerate policy US$50.0 million will bereform for improving social service required.)delivery. Environmental AssessmentCatecory U.

Ministry of 50.0 SAL III - Third phase of support for Consulting services will Project underFinace (Bank) Government's Structural Adjustment be required. preparation.

125.0 Program will provide balance of payments(IDA) support and be conditioned on

satisfactory reforms under the first andsecond phases especially of fiscalmanagement, trade liberalization,dometic deregulation and publicenterprise reform. Will also focus onexport expansion. EnvirormentalAssessment Cateaorv U.

- 39 -

Xbmber Country, Amount &Implementing Probable Stage of Processing andAgency l lender 2 Project I Consulting Services Action on Procurement 4

(Cont d)

Ministry of 50.0 (R) Telecom - The purpose of the Consulting services will Project processing at aInformation, Post (IBRD) projeot is to develop PTC's managment be required for policy, standstill sinceand and implementation capacity to *chicv* finance and enginetrLng, appraisal in SeptemberTelecoemmnications sustainable system expansion and 1992. Further process¢lgimprovement in quality and finances to pending Goveroentimprove sector policy nvironment. The decisions to restructureprocess wLLl support institutional sector.development and rehabilitation and A rPF advance ofexpansion plans. Environmental US$1.12 million has beenAssessment Catecory C. approved to assist with

project preparation.(Cofinancing of aboutUS$260.0 million will berequired.)

Government of 39.6 (R) Agricultural Services - To improve Consultants completing MeNotiations scheduledZimbabwe (IDA) income snd household soods security appraisal reports. for March 1994.among households through reformingagricultural marketing. support toresearch end extension activity,upgrading of livestock support servicc,end improvement of institutionalcapacity within the Ministry of LandAgriculture and Rural Resettlement(MLARR). Environmental AssessmentCAteaorv C.

Government/ 35.0 Smell snd Micro Enterprise Development - Minimal consulting Appraisal report underRJeerve Bank (IBRD) Will provide financial and technical services required. preparation.assistance to small-scale micro (Cofinaneintg of aboutenterprises and institution building for US$5.0 million will ba'participating financial intermediaries, required.)tnvironrmntal Assessme_t Catesorv B.

Ministry of 90.0 (R) Power III - The project will Power engineering Board presentationfnargy/ZESA (TIED) include: ta) operations support, sparex services wlll be tentatively scheduled for

and maintenance services for Evwnge required for operational January 18, 1994.Power stationt (b) upgrading of the support to ZESA.power stations (c) distribution systemreinforcement; (d) vehicles and workshopequipment: and Ce) institutLonal supportto ZESA. Environmental Assessment

AMCA ~ ~ ~ ~ ~ ~ cegr BMU

Governments of 25.0 Regional Power - Develop the hydro Consultants have been Project underSenegal. (IDA) proJect at Manantali and the associated selected for preparation.Mauritania nd transLssion lines to supply Dekar, environmental andmali - (OWS) Bamako and Nouakchott. Environmental institutional studles.Organisation pour Assessment Category A. Other studies to bel1 Mise en Valeur undertaken.du Ileuve Senegal

-40-

Member Country, Amount &Imlementing Probable Stage of Processing andAgenc t Lender Project Consulting Services Action on Procurement'

UW IS.M=

iA1I

To be determined 250.0 Financial Markets Development - Sector To be determined. Preparation under vay.(IDA) adjustment operation vith Banques

Centralc de Etats de I'Afrique del'Ouest (BCEAD) to pursue on a regionalbasis (Burkina Paso, Mali, Niger,Senegal and will participate) bankingreforms initiated in 1989-1990 invarious member countries of the UMOAzone. In particular, will fostermarket-oriented mechanisms, promotemarket allocation of investible funds,encourage intra-zone financial savingsand facilitate economic integration.Environmental Assessment Cateaorv U.

To be determined 7.0 Western Africa Came Rsnching Extension - Consulting services will Appraisal mission(IDA) The project will support investment in be required. Estimated postponed until April

carefully selected game ranch at 30 staffvesks. 1994.operations, including development of (Cofinancing is expectedroads and tracks, boundary demarcation from Global Environmentdam constructlon, firebreaks, anti- Facility (GEF) only.)poaching operations, staff training andequipment, vehicles and basic managementfacilities. The type of wildlifeutilisation will depend on sitecharacteristics, but may include gameviewing, cropping and sport hunting.Total project cost is US$11.0 million.Environmental Assessment Categorv B.

- 41 -

Member Country, Amount &1Isp-nmting Probable Stage of Proecsslnz adAgency 1A=dev Project Consulting Services ction on Prosaur<nt 4

I. EAST ASIA AID PAIF!C RG0NC

Ministry of 15.0 (1) Economic Management - Tochnical Consulting services will Pre-appraisal missionEconomy and (IDA) assistance project to provide support to be required. scheduled for March 1994.Finance key government agencies involved in

economic managment. This project willaccompany the structural adjustmentcredit. Environmental AssessmentCategory C.

Ministry of 60.0 (R) Adjustment and Rehabilitation - Consulting services will Prt-approisal missionFinance (IDA) Project will support the reconstruction not be required. scheduled for March 1994.

of Cambodia and the initiation ofstructural reform in the fields oftaxation, banking end expendituremanagement. Enmvronmental AssessmentQategory C.

MlniStrY of 20.0 Agricultural Rehabilitation - Need for consultants not Preparation dependentAgriculture (IDA) Rehabilitation program for irrigation, yet determined, upon country stability.

fisheries and rubber. EnvironmentalAssassment Category: To Be Determined.

To be determined 250.0 (N) Financial Sector Development - The Consulting services will Identification under way.(Bank) project would assist in the reform and moat likely be required

modernization of its financial system. for the development ofIts main compoen ts are under discussion the training component,vith the authorities. They could also and technical assistanceinclude assistanc, to the People's Bank to various financialof China, specialimed banks, and institutions.possibly other financial institutionsfor institutional development andrestructuring, investments related tothe payment system, and computerimedfinancial institutions and training.Environmental Assessment Categorv C.

State Education 100.0 (N) Basic Education In Poor and Minority Need for consultants not Prt-appraisal mLssionComission (IDA) Araa- - Project vill support provision yet determined, scheduled for January

of universal basic education. Will also 1994.finance improved schooling conditions inselected poor counties, includingfacilities, material inputs, teachersend management. EnvLronmentalAasessmsnt Category C.

Ministry of Posts 255.0 (R) Telecominications - Project vill Consulting services will Negotiations completed.and (Bank) develop a modern, commercial sector and be required and vill be Board presentationT lecommunications expand and modernize long distance and financed by a Board for scheduled for

local networks. Enironmental Investment and Technical December 21, 1993.Assessment Catetorv B. Support (BITS) grant.

Ertan 500.0 Ertan Hydroelectric II - Project will Consulting services will Project is at preparationBydroelectric (lank) include: (a) second phase of be required. stage.Developmnt installation of six 500 KW units; andCorporction, (b) erection of about 2,500 km of 500Sichuan Electric transmission lines. EnvironmentalPoyer Assessment Category AAdministration

- 42 -

M mber Country, AmountSImplementing Probable Stage of Prooossing andAgency Lender I Project Consulting Scrvices Action on Procurement'

(Cont4d)

South China 400.0 (R) Longtan Bydroelectric Power - Consulting services will Project has beenElectric Power (Bank) Project includes construction of a dam be required. identifled, and is at theCovernment Joint over 200m high with an installed preparation stage.Venture capacity of 5,000 MW. EnvironmentalCorporation Assessment Categorv .

Zhejians 400.0 (R) Zhejiang Power Development - Project Consulting services for Pra-appraisal has beenProvincial (Rank) will include. (a) construction of two engineering, financed completed. AppraisalElectric Power 600 MW coal-fired units at Beilungang under CRISP, already miasion scheduled forCompanr Power Stations (b) construction of the awarded. Others will be April 1994.

first phase of the Wangjianguang required for accountingCogeneration Plant; (c) addition of a and financial MS and250 circuit km of 500 kV transmission financial managementlines, 1,500 MVA of 500 kV substations, advise.end 400 km of 220 kV transmission lineand 1,030 MVA of 220 kV substations:(d) renovation and reinforcement of theurban distribution networks in Eangzhouand Ningbol and (e) technicalassistance, studies, and training.Total project cost is US$530.0 million.Environmental Assessment Catesorv A.

Jiangsu Provincial 350 .0 (R) Yangzhou Thermal Power - Project Consulting services will Appraisal mission hasElectric Power (Bank) vill include: (a) construction of a be required. been completed.Company coal-fired thermal power plant with two Appraisal report under

600 MW generating units; (b) erection of preparation.500 kV transmission lines and-reinforcement of the existing powertransmission network; (c) constructionmanagement and engineering aervicest and(d) strengthening of the beneficiary'sorganization through the provision oftechnical assistance and training.Total project cost is US$470.0 million.Environmental Assessment Categorv A.

State Planning 171.0 (R) Technology Development - The project Consulting services will Appraisal mission is inComsission, (Bank) assists in the formulation of measures be required. the field. BoardEngineerinS to improve the policy and regulatory presentation scheduledResearch Centors, framework for industrial technology for July 1994.National Institute development. It also supports theof Meteorology strengthening of technology related

public services, and the restructuringof the research and developmentestablishment. Environmental AssessmentCategorv B.

Chongqing Planning 150.0 (R) Chongqing Industrial Reform and Consulting services will Preparation mission wasCommissLion (Bank) Pollution Control - The project will be required. completed in November

link industrial policy reform, 1993.restructuring of industrial enterprisesand strengthening of environmentalregulatory policy and framework into enintegrated program that will include:(a) policy reform; (b) a line-of-creditto finance industrial restructuring andpollution control; and (c) enenvironmental regulatory component.Environmental Assessment Caterorv B.

* 43 -

Member Country, Amount &Implementing Probable Stage of Processing andAgency ' Lender t Project I Consulting Services Action on Procurement 4

(Cont d)

Hubei 125.0 (R) Eubei Urban Environmental - Support Consulting serviees will Preparation missionEnviroamental (Bank) to improve water pollution control in be required to assist in scheduled for FebruaryProtection Bureau 25.0 Mid Yangtze River Basin. Project will project preparation and 1994.

(IDA) also include possible physical implementation.Investment in Wuhsan Xiangf an, Huangahi,end Yichaing for wastewater collectionand treatment * olid waste man-gement,industrial pollution control,institutional development of sectoragencies and training. EnvitronmentalAssessment Cateaorv B.

Shanghai Municipal 270.0 Shanshai-Zhejiang Eighway - The project Consulting services will Appraisal mission is inConstruction (Bank) would comprise: (a) construction of the be requtred. the field.ComLission and 131 km Shsnghai-Hangzhou ExpresswaysZhejiang (b) upgrading of 80 km of trunk highwayProvincial to Improve road safety: (c) procurementCommunications of equipments and (d) training andDepartment technical assistance. EnvLronmental

Assessment Cate<orv A.

Ministry of 350.0 (R) Seventh Railvay - The project Need for consultants not An identification missionRailways (Bank) comprises three types of components: yet determined, is planned for end

(a) investment with built-in February 1994.technological modernization endinstitutional developmentg (b) policyreform and institutional development:and (c) technical assistance to prepareaction plans including investments forpossible implementation under futurerailway projects. EnvironmentalAssessment Cateaorv B.

Department of 150.0 Inland Waterways Multipurpose - Project Consortium of local and Feasibility studies andCoamunications of (Bank) involves: (a) improving navigability of foreign consultants Is economic and financialZhejiang Province, rivers and canals including construction being engaged by the analyses andCuaugxi Province, of dams, required power stations end Ministry of environmental asvessmentand Hunan Province other facilities, and dredging of rivers Communications to help are under way. Next

end procurement of equipment: update feasibility mission planned for early(b) preparation and implementation of an study, preliminary next year.environmental action plan and design, financial endorganizational reform action plan; and economic analyses.(c) training and technical assistance.Environmental Assessment Categorv A.

Tianjin Port 150.0 Ports VIII - Project description is to Consulting services will Identification missionAuthority, (Bank) be determined, pending completion of be required. scheduled for SpringXiemen Port Bureau Strategic Issues in Ports and Shipping 1994.

(SIPS) study. Environmental AssessmentCategory A.

- 44 -

Member Country, Amount &Implcemnting Probable Stage of Processing andAgency I Lander I Project I Consulting Services Action on Procurement

(CCnt'd)

Yellow River 110 .0 (R) Xiaolangdi Resettlement - Project A sm*ll international Appraisal missaonConservancy (IDA) involves resettlement of 171,000 people consultancy component is completed. AppraisalCommission and displaced by the construction of the included for monitoring report under preparation.Ministry of Water Xiaolangdi Multipurpose Dem. There are a resettlement panal,Resources (MWR) four main components: (a) construction and industrial and other Retroactive financins of

of about 44,000 houses and infrastruc- consultants to advise up to P5510.0 millionture for 276 villages and 11 townss and assist the will be reauested(b) transfer of resettled people from resettlement andtheir present locations to new likelihood developmentlocations; (c) development of about program.15,000 ha of land for agriculture vithirrigation, about 100 industries forjobs for resettleras and (iv) a planningand design component. In addition,there will be vocational training forresettled people, a monitoring andsocial adjustment program. TheEnvironmental Assessment Summarv haibeen submitted to the Board on April 15S1993 as a part of the XiaolanrdiMultipurpose proiect. EnvironmentalAssessment Category A.

To be determined 25.0 Economic Law Reform - The project would To be determined. Preparation under way.(IDA) support China's economic reform by:

(a) assisting in the preparation ofeconomic legislation in priority areams(b) training law teachers, legalpractitioners and legal and otherpersornel in Government departments, inthe theory and practice of the new legalfram works and (c) strengthening the keylegal institutions responsible forlegislation and implementation ofeconomic laws. Environmental AssessmentCategory C.

Leading Group for 200.0 (R) Southwest Poverty Reduction - Consulting se-rvices will The first preparationPoverty Reductien (IDA) Project seeks to reduce absolute poverty be required. mission Ls scheduled forand Yunnan, through a multisectoral program, mid-January 1994.Guangxi, and including: (a) environmentallyOuiahou Provincial sustainable rural economlc developmentsCovernments (b) improved access to social services;

(c) experimental initiatives in labortrainini and mobility, employmentschemes, nd rural credit; and(d) improved national end local levelpoverty monitoring and programevaluation. Environmental AssessmentCategory: To Be Determined.

Ministry of 100.0 Feed Industry Development - The project Consulting services will The first technicalA4riculture1 (Bank) would increase production of foed be required. preparation mission is inNational Feed 50.0 additives and concentrate feeds, upgrade the field.Industry Office (IDA) feed industry design and training

institutes, agro-industrial wasteconversion to protein foeds, and developintegrated feed mill/livestockproduction/processing complexes.TSchnical assistance and training vouldbe provided. Poverty alleviationcomponent to be determined.Environmental Assessment Category: ToBe Determined.

-45-

Member Country, Amount LIMplementint Probable Stage of Processing eadAgency I Lendr ' Project Consulting Services ActLon on Procurem nt t

(Cont d)

Hebel and HEnsa 380.0 National Highway - Construction of new Consulting serviceas will Project appraisal missionProvincial (Bank) national highway over 216 km in Beb-i be required for completed August 1993..Comtnwications province and 124 km in Henan province to construction supervision Appraisal report underDepartment relieve heavy congestion on critlcal services, staff preparation.

sections. Environmental Assessment training, and studies.Categorv A.

XWlrl-ng 150.0 (R) Xinjieng Highway I - The main Consultants vlll be Appraisal mission wasCommnication (Bank) components of the project are: required for: completed in NovemberDepartmant (a) construction of Turpan-Urumqi- (a) construction 1993. Appraisal report

Dahuangshan Highway (283 km) and supervilsion services; under preparation.improvement of some linking (16 km) (b) study of highwayroads; (b) institutional strengthening matntenance; (c) studyof Xingiang Communications Department of inter-city passenger(XCD); (c) improvement of highway transports and (d) staffmaintenance- (d) improving highway training.safety: and (e) study of inter-citypassenger transport. EnvironmentalAssessment Categorv A.

YEngtze Water 60.0 Yangtze Basin Water Resources - Project Consulting services in Pre-appraisal missLonResources (Bank)/ comprises three main components: commercializing scheduled for SpringComission, Hunan 150.0 (a) flood forecasting and warning system irrigation operation and 1994.Province, Hubei (IDA) to be installed for upper and middle maintenance districts,Province Yangtze River Basins (b) water resource establishing multi- Procurement:

components for Bunan Province to improve purpose river basin International Competitiveirrigation, drainage and flood control authorities, and Bidding (ICB) requiredin four subprojects benefiting about irrigation/drainage for medium sized dam300,000 ha; and (c) water resource, soil technology will be construction. Pre-conservation and aquaculture components required during qualification and tenderfor Hubei province in five subprojects preparation. document preparationbenefitting about 500,000 ha. under way.Environmeental Assessment Cateorv A.

Retroactive financins tobe determined.

Ministry of 200.0 (R) Forest Resource Development and Expressions of interest Appraisal report underForestry (IDA) Protection - Project will focus on the are solicited from preparation.

establishment of 250,000 ha of consultants in the (Possible financingprotection forests on marginal land, and fields of silvicultural (US$20.0 million) from550,000 ha of commercial timber management, forestry the Global Environmentplantationsz improvement of management research, biodiversity Facility (GEF).)of the nature reserve system; and preservation, andgenetic Improvement of tree planting natural resource Retroactive fLnancins maymaterialt and strengthening of research economics. The number be requestedand training. Envlronmental Assessment of staff months, termsCategorv B. of reference, and

breakdown betweenindividuals and firmshave not yet beendetermined.

Ministry of 300.0 Rostructuring Fertilizer -. Support to Consultants advisory Project preparation underChemical Industry (Bank) MCI in the implementation of its overall services will be way.(MCI)IYunfu fertilizer sector strategy, including required.Corporation the development of a large phosphate

plant and rehabilitation of mediumismallsized plants as well as associatedinstitution bullding. EnvironmentalAssessment Catetorv A.

-46-

Member Country, Amount &Implamenting Probable Stage of Processing endAgency I Lender2 Project Consulting Services Action on Procurement

(Cont'd)

Fujian Provincial 140.0 (R) Fujian Provincial Highway - The main Consulting serviees will Approvwd by the ExecutiYvTransport (Bank) project components include: include- Directors on December 14,Department (FPTD) (a) construction of Quanzhou-Xiamen (a) construction 1993.

highway (76 km)l (b) improvement of supervision services;provincial road network; and (b) assistance to the Retroactive finsucinx of(c) strengthening of provincial road strangthening of the may be recuired.construction industry. Environmental construction industry;Assessment Cateaorv A. and (c) staff trainins.

Ministry of Publie 135.0 (R) Maternal Child Health - Improvements To be determined. Appraisal report underHealth (IDA) in maternal and child health services, preparation.

especially in the poorer regions of thecountry. Environmental Assessment Retroactive financinx mayCategorv C. be -reuired.

State Education 165.0 (R) Vocational Training and Labor Market To be determined. Identification missionComoissionl (Bank)/ Services - The project will finance completed. ProjectMinistry of Labor 75.0 vocational training activities in preparation under way.

(IDA) selected provinces, includingfacilities, equipment, staffingmanagement and suitable integration withgeneral education. To supportdevelopment and rationalization of labormarkets to absorb future redundant laborfrom state enterprises. EnvironmentalAssessment Catecorvi To Be Determined.

Shanghai Municipal 150.0 (R) Second Shanghai Metropolitan Some consulting services Approved by the ExecutiveConstruction (Bank) Transport II (formerly Second Shanghai for project preparation Dir-ctors on October 14,Cocmission (ShCC) Metropolitan Transport) - Project will be funded under the 1993. Loan signing

consists of four key elements: technical assistance of scheduled for(a) construction/upgrading of Inner Ring SMT? I. Further December 15, 1993.Road (IRK) forming an extension of the technical assistancecomponent started under SMTP Is would include consulting Retrogetive financing of(b) public transport - physical works services for: UD to USSl5.0 million hasfor the Shanghai Transit Company; (a) project management been requested.(c) traffic management - extending this including constructioncomponent of SMTP I to the whole area supervisiongwithin the IRRA and (d) technical (b) transport planningsassistance for project implementation (c) traffic management$and institutional development. (d) road pavementEnvironmental Assessment Catetorv A managements

(e) environmentalmonitoring andmitigation: and(f) strategic publictransport planning.

Ministry of 325.0 (R) Housing and Social Security Reform - Consulting services will Appraisal missionFinance and Five (Bank)/ Will help the divestiture of enterprise be-required for completed.Participating 75.0 responsibilities for housing and social development of housingMunicipalities (IDA) security to promote enterprise reform, management, housing

labor mobility, the housing market, and finance, pension, healthstrengthen social safety nets. and unemploymentEnvironmental Assessment Cateaorv B. insurance systems.

- 47 -

Member Country, Amount oImplementing Probable stag of Proce£aWg adA4gncy Lender I Project Consulting Services Action on Procurement

(Cont'd)

Shenyang Munilpal 17S 0 (R) Shenyang Engineering Industry - Consulting services vill Appraisal miss icn is'Govrnment, (Bank) Assistance to the municipal government be required for projeot tentatively scheduled forShenyang Machine in the implementation of its overall preparation and January 1994.Tools Corporation industrial strategy including impleomntation.Limited (SM?CL) restructuring plans in select subsectora

together with associated institutionbuilding. The financial intermediariaswill assess the environmental impact ofall subsector projects to ensure thatthey are consistent vith Bank standards.Environmental Assessment Cateeorv B

Linoning 205.0 (R) Songlico Plain - Project vould Consultants for water Appraisal missiocnProvincial (IDA) assist the provincial governments in resource management end completod. NegotiationsPlannins and solving vaterlogging, soil salinity and final design of agro- Yp-cted January 10,Economic low crop productivity problems in 40 processing plants may be 1994.Commission, Jilin counties in Liaoning and Jilin required duringProvincial provinces. It would invest in implementation. Retroactive financins ofPlanning and irrigation and drainage facilities, uo to U5S14.0 million isEconomic plant vwndbreaks, provide agricultural orooosed.Commission inputs, rehabilitate fruit orchards,

improve livestock and aquacultureproduction technologies and promoteagro-procassing and agro-industries,particularly the value-added processingof surplus corn. The project woulddirectly benefit 518,000 poor farmfam1ilis. Environmental AsessmentCateterv B.

Sichuan Petroleum 250.0 tR) Sichuan Gas Development and Consultants for Ssgotiationg tentativelyAdministration (Bank) Conservation - Project will assist the technical assistance in scheduled for January

government in (a) carrying out the restructuring the 1994.first phase restructuring of the oil/gas sector have been (Global Environmentupstream oil and gas sectorl selectad. Facility (GEP) financed(b) rehabilitating and developing some pro-investment study isthe Sichuan gas fields along with near completion.)associated gas transmission anddiatrilution systems and(e) strengthening the technicalcapability of the Sichuan Petroleumdministration. EnvironmentalAssessment CateRor A.

Ministry of Water 160.0 CR) Loese Plateau - Agricultural Consulting serviees Appraisal report underResources (IDA) productivity would be improved and may be required for preparation.

environmental degradation reversed in fruit orchardnine tributaries of the Yellow River in development, and Retroactive financing ofthe Laess Plateau area through3 grassland and nursery Up to USS00 million(a) construction of terraces, small soil management during will be re_uested.dams and other erosion control workst project implementation.(b) establishment of pasture, shrubs andtrees on steeply sloped land, and(e) improved manag-ment of communalgrazing lands. Project would improveproductivity and incomes of 1.2 millionabsolute poor and curtail soil erosionfrom 15,000 sq. km catchment area.Environmental Assessment Catezory B.

- 48 -

Xember Country. Ammumt S

Implementing Probcble Stage of Processing andA4ency Lender 2 Project Consulting Services Action on Procuremnt

(Cont d)

Ministry of 150.0 (R) Second Red Soils Land Rehabilitation Consulting services may Negotiations scheduled toAgriculture (IDA) - Disseminate techniques of ecologically be roquired during begin Deeemb<r 13, 1993.

sustainable and economically viable land project implementation.rehabilitation and voluntary settlement Retroactive financing ofover a wide area of degraded red soils up to USS10.0 millionacross Jiangxi, Fujian, Eunan, Zhejiang will be requestedand Guangxi--and technical assistance tosupport research and strengthenextension systems. EnvironmentalAssessment Catesorv S.

Liaoning 150.0 (R) LLaoning Environment - Continuing Consultants engaged for Appraisal report underConstruction (Bank)/ support to improve vater management and project preparation. preparation.Commission 10.0 water pollution control in the NunlTaiai

(IDA) River Basin. consists of physleal and Retroactive financing ofinstitutional development for works for up to USS16.0 millionwvste water, solid waste management for will be requested.the elties of Benxi, Dalian, Jingzhou,Fushun and Anshan and cultural heritageconservation. Environmental AssessmentCategory A.

Planning and 250.0 Southern Jiangsu Environmental Consultants have boen Approved by the ExecutiveEconomic (Bank) Protection - To support investments in s*lected. Two studies Directors on Karch 25,Commission of urban and industrial projects that are being financed under 1993. AwaitingJiangsu Province demonstrate significant environmental the Japanese T.A. Grant Government action to

payoffs and to strengthen institutional, Facility, schedule loan signing.regulatory and environmental managementcapabilities of the local agencies. Retroactive financing ofEnvironmental Assessment Catetorv B. uM to USS2.0 million has

been aporoved.

Yellow River 460.0 (R) Xiaolsngdi Multi-purpose Consultants for Appraisal report underConservancy (lank) - To construct major dam (Xiaolangdi) on construction supervision preparation.Com isaion Yellow River to provide protection for have been selected.

100 million people from catastrophic Consulting services have Procurement:floods on North China Plain, alleviate also boon included for International competitivesiltation and aggradation of river institutional support, bidding (ICB) tenderingchannel, provide irrigation water to financial management of major civil works nowover one million ha of farmland, provide training, etc. under way.municipal and industrial waterthroughout the region, and generate Retroactive financing ofelectric power. The resettlement of up to US$40.0 million hasabout 170,000 people over a 20 year been requested.period is being addressed by theXiaolangdi Resettlement Project.Detailed plans have been prepared, and apilot resettlement site is beingcompleted. Potential environmentalimpact has been reviewed and EZA rerortwas submitted to the Bogrd on April 15.1993. Environmental Assessment CatemorvA.

- 49 -

Member Country, Amount S.Implremnting Probable Stage of Processing andAgency I Lender 2 Project I Consulting Services Action on Procurement 4

TEm(Cont-d)

Tianjin 150.0 Tianjin Industrial Development II - Consultants have Approved by the ExecutiveMunicipality and (Bank) Assistance to the municipal government prepared sub-sector Directors on March 16,China Investment in the lmplementation of its overall devalopment plans end 1993. AwaitingBank industrial strategy including subsector strategies. Government action to

end restructuring plans in a selected schedule loan signing.number of industries together withassociated institution buildLng. The Retroactive financina offinancial intermediaries will assess the up to USS5.0 millionenvironmental impact of all subsector would be reouired forDroiectJ to ensure that they are urgentlv needed ecuinnentconsistent with lank standards, and consultant servtcesEnvironmental Assessment Cateaorv B. under the techntcal

assistance comoonent.

Shanghai Municipal 150.0 (R) Shanghal Industrial Enterprlse Consultants have been Pre-appraisal missionGovernment (Bank) Reform - Assistance to the municipal hired to prepare postponed until early

government in the implementation of its restructuring and 1994 reflectLng state ofoverall industrial strategy focussing on feasibility studies for readiness of implementingenterprise reform and associated subprojects. agency.institution building. The financialintermediaries wlll assess theenvironmental tmnact of all subsector-yroiects to ensure that they areconsistent with Bank standards.Environmental Assessment Category B.

Shsnghai Municipal 150.0 (R) Shanghai Environment - Continuing Consultants for project Negotiations tentativelyGovernment (Bank) program to improve water supply preparation have been scheduled for January

sewerage, solid waste management, engaged. Preparation 1994.catchment, and environmental pollution well advanced.control in the city of Shanghai. Retroactive financing ofEnvironmental Assessment Catesory B. up to USS15.0 miLlion

will be requested.

ProcurementInternational competitivebidding (ICB) tenderingof major civil works nowunder way.

Fiji

MLnistry of 20.0 Education - To further develop general To be determined, Project preparation underEducation (Bank) education, especially pre-school and way.

secondary education, includLng secondaryteacher training and to introducerelevant and cost-effectivetechnical/vocational training programs.Total project cost is US$70.0 million.Environmental Assessment Cateory C.

Ministry of Public 100.0 Jakarta Water and Sanitation - Project Consulting services will Government revlewingWorks (Directorate (Bank) will assist in: (a) implementing be roquired to assist in project concept andGeneral of Euman priority investments in water supply and project preparation and components.Settlements) waste water disposall and implementation.

(b) strengthening relevant institutions.Enmvironmental Assessment Category B.

- 50 -

Member Country, Am out &Implementing Probable Stage of Processing andAgency Lendr ' Project ' Consulting Services Action on Procureent 4

(Cont d)

Directorate 165.0 (R) Smarang Surakarta Urban Development Consultants will be Appraisal completed.General for Human (Bank) - IMprovement of the functiontng of the required forResettlements cities of Surakarta in Central Java- implementation support. Retroactive financina has

Province, through an integrated program detailed design and been pronosed.of priority infrastructure iavestments supervision, and forsupported by revenue improvement and institutionalLnstitutional development action plans. development andEnviron-mntal Assessment Category A. training.

To be determined 75.0 Accountancy Development II - To improve To be determined. Project identiflcation(Bank) accounting practices in both the public under way.

and private sectors. The project maysupport: (a) continuing implementationof a modern government accountingsystem, (b) improving governmentauditing servlcesl (c) increasing theefficiency of the capital markets(d) introduclng accounting auditing andaccountLng standardsl and (a) improvingthe professional education ofaccountants. Environmental AssessmentCatesorv: To Do Determined.

To bo determined 30.0 Eastern Islands Development - To b. determined. Next processing step will(Jank) Ixpl-emntation of a rural development be determined following

project in southeastern Sulawesil the preliminary findingsconsolidationJexpansion of the of the Eastern Islandsactivities initiated under ongoing Nus& Development StrategyTenggra Agricultural Support Projects Review began end Octoberand proj et preparation for other 1993.islands. Environmental AssessmentCatagor: To Be Determined.

Directorate 60.0 (R) Dam Safety - To establish dam safety To be determined. Appraisal missionGeneral Water (Bank) monitoring procedures and to carry out completed.Resource repairs on existing large and smallDevelopment scale dam. Environmental Assessment(DGWRD) Catesor B.

Ministry of Public 100.0 (R) Kebupaten Roads V - Project seeks Consulting services will Appraisal completed.Works (Bank) to: (a) address sustainability of the be required for Staff appraisal report is

Xabupaten Roads Program -- primarily the supervision of civil being prepared.institutional technical, planning and works.environmn tal aspectst nd (b) improvethe quality of the network in Riau,Ea-ternlSouthern/Central Kalimantan andpossibly Maluku. EnvlronmntalAssossment Catetory B.

Directorate 150.0 (R) Java Irrigation Improvement and Consulting services will Appraisal completed.General of Water (Bank) Resource Water Managemnt - To support be required for: Staff appraisal is beingResoure-s, integrated water resources management in (a) preparation of Water prepared.Ministry of Public siz river basinsl rehabilitation of Resources Plan for threeWorks 220,000 ha unLmproved larger ( > 500 ha) basins; (b) operational

publlo irrigation systems, so that they support for Basin Watercan be brought under efficient operation Resources Management;and maintenanAe for sustained higher and Cc) planning/designlevel of production, and turnovar of for irrigation works.small ( < 500 ha) publie irrigationsystems totalling 350,000 ha.Environmental Assessment Catexory S.

Member Country, Amount &Implementing Probabl- Stage of Procei5iUg andAgency Lender 2 Project ' Consultins Services Action on Procurement'

(Cont'd)

To be determined 75 0 (R) Agriculture Extension/Trainilng - To be determined. Project preparation(Bank) Project would support the reorganiuation mission currently in the

of extension services to maet the field.changing requirement of the agriculturalsector, and introduce fundamentalchanges in extension methodology andtraining approaches. EnvironmentalAssessment Catesorv: To Be Determined.

Directorate 63.0 Tree Crops Smallholder Development III - To be determined. Preparation xpected toGeneral of Estates (Bank) To support the Government's objective to begin May 1994.

increase farmrs' incomes in Sumatrathrough mass conmunication extension forsmallholder rubber and coconut. Projectwill also include: (a) quality controland certification of planting materialsproduced by private sector nurseriesi(b) extension for farmer-finan¢edestablishment of 75,000 ha of rubber endhybrid coconutas (c) maintenance tomaturity of 98,000 ha of rubber andcoconut established under TCSDP Is(d) continued extension in TCSDPg(e) contlnued TCSDP I cost recoveryprogram; (f) strengthening of theprovincial estate services to enablethem to take over the flrst lineresponsibility for the program; end(g) provision of assistance to farmer'sgroups. Environmental AssessmentCategorT B.

National Land 64.0 (R) Land Administration - Project aims To be determined. Appraisal mission

Agency (BPN) (Bank) to accelerate registration and titling currently in the field.of non-forest land, increasing theeffctiveness of lend administration endto devise a long-term policy for landmanagement. Environmental AssessmentCategorv B.

To be determined 60.0 (R) University Research for Graduate To be determined. AppraiSal mission(Bank) Education - The project vould support tentatively scheduled

selected competitive grant programs January/lebruary 1994.including domestic fellovships, researchgrants, grants for university units, andstrengthening of competitive selectionsystems. Environmental AssessmentCategory C.

Ministry of 250.0 Public Enterprise Restructuring - To To be determined. Project identificationFinan¢e (Bank) support the commercialization and under way.

privatization of public enterprisesreform operating in competitive markets.Environmental Assessment Catesory: ToBe Determined.

TELEuoH, POSTEL 400 0 Telecom Sector Modernization - To Consulting services will Project preparation under

(Bank) modernize end xpand telocommunlcations be required for: vay.in Jakarta and other major cities (Java, (a) project preparationBali and Nusatenggra), and support for physical works;sector end institutional reform, and (b) strengtheningpromote diversity of supply and project implementationscompetition. Environmental Assessment and (a) policy andCategory B. institutional

strengthening.

- 52 -

Member Country, Amount iImplementing Probable Stage of Proc-ssing andAgency Lender a Project I Consulting Services Action on Procurement

IONSU(Cont d)

Ministry of Public 150.0 Strategic Urban Transport Infrastructure Consulting services will Project identificationWorks, Directorate (Bank) (SUTIP) - Project will assist ln the be required for project under way.General Bina Marga establishment of a national strategic preparation. Terms-of-

urban transport program, implement Reference currentlypriority links in urban road networks, being prepared.and improve institutional capacity forurban road program management.Environmental Assessment Category: ToBe Determined.

To be determined 150.0 Urban Environment Sanitation and Water - Consulting services vlll Identification under way.(Bank) Investment in urban water supply, be required for policy

sanitation, drainage and solid wast, (institutional,management and institutional development financial and technologyfor local utility enterprise and policy options) and projectdevelopment. Environmental Assessment preparation for physicalCateacry: To Be Determined, vorks.

Department of 60.0 (R) Book and Reading Development - To Consulting services will Project preparation underEduction and (Bank) strengthen both the demand for and be required for way.Culture, BALITBANG supply of educational books through strengthening project

improved book publishing, printing and implementation.distribution as well as school librarysupport and active reading promotion.Environmental Assessment Category C.

To be determined 120.0 Eigher Education III - To improve the To be determined. Project identification(Bank) hiSher education system. Environmental under way.

Assessment Catexorvy To Be Determined.

To be determined 100.0 Professional Human Resource Development To be determined. Project identification(Bank) II - To develop human resources under way.

management. Environmental AssessmentCatexorv: To Be Determined.

To be determined 100.0 Secondary Education III - To assist in To be detcrmined. Project identification(Bank) secondary education management and under way.

quality control. EnvironmentalAssessment Categorvy To Be Determined.

To be determined 15.0 (R) Biodiversity Conservation - The Consultants selected for Project preparation under(Bank) project would aim to: (a) develop a project preparation. way.

model for an Integrated Conservation Consultancies forDcvelopment Project (lCDP) including further project(t) an institutional framework to manage preparation to bethe Kerinci-Seblat National Park, financed under Japanese(ii) establishing mechanisms for local Grant Facilitycommunity participation in conservation Agreement. Consultantand development activities, end services required for(iii) support for provincial governments implementation to beand RGos, and (iv) policy studies; and determined.(b) support several other institutionsalso of high priority under theIndonesian Siodiversity Action Plan,including ex-situ conservation, policystudies and conservation promotion.Environmental Assessment Categorv A.

- 53 -

Member Country, Amount &Implementing Probable Stage of Processing andAgency I Lender 1 Project Consulting Services Action on Proeurement 4

INDONESIA(Cont d)

Minisitry of 70.0 Forestry III - Strangthening of the To be determined. Pre-appraisal missionForestry (Bank) managemant of human resources and likely to take place

institutions in the sector (including early next year.some specific research and inventoryinputs); investment in independentinspection of forest operations inpursuit of sustainability and greenlabelling; and improvement ofparticipation of forest communities inmanagement. Environmental AssessmentCatetorv A.

To be determined 250.0 Gas Development - To promote non- To be determined. Pro-appraisal delayed,(Bank) tradeable supplies of natural gas for tentatively scheduled for

industrial end commercial use to meet January 1994.demand in Java. EnvironmentalAssessment Catexorv A.

To be determined 280.0 (R) Rural Electrification II - Support To be determined. Pro-appraisal completed.(Bank) for the Government's rural electrifica-

tion program and for further developmentof Government's role in encouragingprivate participation in ruralelectrification. EnvironmentalAssessment Cate-orv B.

Ministry of Public 100.0 Kalimantan Urban Development - Five-year Consultants undertaking Project preparation isWorks, Directorate (Bank) urban infrastructure expanditure project preparation under way, Pro-appraisalGeneral for Human programs for participating local including envlroenntal mission is in the field.Settlements governments. These will include analysis, instltutional

municipalities of Samarinda, Balikpapan, strengthening, andBanjarma in, Palangkaraya and Pontianak training.which account for about 80X of theKalimantan urban population, and up toone Kabupaten from each of theprovinces. Environmental AssessmentCateRorv A.

Directorate 70.0 (R) Secondary School Teacher Development To be determined. Project identificationCGneral of Higher (Bank) - To improve the quality of secondary under way. Pro-appraisalEducation, MOEC teachers through in-service and prc- miLsion scheduled for

service training. Environmental March 1994.Assessment Category C.

Directorate 60.0 (R) Integrated Swamps Development - About 1,600 mnmoontha of Negotiations tentativelyGeneral Water (Bank) Project is second stage development of consultant sarvices scheduled for JanuaryResources existing swamp schems. Will also required to assist 1994.Development rehabilitate infrastructurs, improve borrower with project(DGWRD) agriculture, and support environmental Implmentation.

protection. Environmental assesamenthas been comnleted and a summarv reportdistributed to th Executive Directors.Environmental Assessment Catetorv A

Ministry of Public 350 .0 (R) Highway Sector II - To improve the Consulting s-rvices will Board presentationWorks/Ministry of (Bank) quality of interurban national/ be required for project scheduled for JanuaryCommunications provincial roads through selective implementation. 1994.

capacity improvements and maintenance.Also, to improve formulation and Retroactive financina ofimplementation of road infrastructure US835.0 million for civiland road transport policies, works has byen uroposed.Environmental Assessment Category B.

- 54 -

Member Country, Amount 9Implementing Probable Stage of Processing andAgency Lander Project Consulting Services Action on Procurement 4

IDDOUNSI(Cont d)

Parusah an Umum 190.0 (R) Outer Islands Power - To support Consultants for detailed Pre-appraisal completed.Listrik Nagar& (Bank) expansion of generation and transmission enginaering for BeaJi(PLN) facilities in outer islands, including and Banjarmasin have Advance Procurement:

90 MW BSami hydro plant in South Sumatra been selacted. Other Advance procuroemnt forand 130 MW coal fired thermal plant in consultant servicae are pre-qualification ofSouth KAlimantan. Project scope not yet still to be determined, contractors for civildefined. Basal hydroelectric will works for Banai is incomprise intake dam, headrace tunnel, progress.underground penstock, power house 5 kmdownstream and tail raco. Unsolicitedprivate power proposal or the coal-firecplant being evaluated by the Governmentand PLN. E mvironmental AssessmentCate*orM A.

Ministry of Public 175.0 (R) Surabaya Urban Development - To help Consulting services will Negotiations scheduledWorks, Surabaya (Bank) institutional strengthening and priority be required to assist in for January 1994.Municipality urban infrastructure investments in project implementation,

Surabaya. Environmental assessment has including the Integrated Retroactive financina ofbeen distributed to the Executive Urban Infrastructure uo to USS10.0 million isDirectors. Environmental Assessment Development Program beina considerod for hishCateorv A. (IUIDP). prioritv design and

manasement assistance andadvanced civil works.

To be determined 70.0 (R) Health TV - The project vould Consulting services will Project identification(Bank) support health sector investment in be required for project completed.

basic services, quality improvement preparation.programs, and resource mobilization inselected provinces. EnvironmentalAssessment Catezorv C.

Ministries of 58.1 Watershed Management and Conservation - Consulting services and Negotiations completed.Forestry, (Bank) Strengthen sustainable natural resource NGO will be required to Approved by the zxecutiveAgriculture and management in critical watersheds. assist in project Directors on November 9,Home Affairs Institutional development at national implementation. 1993.

and regional levels and specificconservation activities in CimanukWatershed In West Java. Would reduceland and resource degradation andimprove social conditionsEnvironmental Assessment Catezory B.

Ministry of 30.0 (R) Skills Development . To support Consulting services will Negetiations scheduledMKnpower (Bank) development of effective training bo required to assist in for January 1994.

delivery systems in three selected project implementation.provinces. Environmental AssessmentC-;esorv C.

Public Port 90.0 Ports Upgrading - The project would- Consultants have been Project identificationCorporation II (Bank) (a) provide for expansion requirements r eruited by Perump-l II under way.

(Perumpel II)g in secondary ports to meet rapidly for pra-investmentMinistry of Increasing traffic, and (b) improve studies for two ports.Communications installations end practices for Consultants will be(MOC) environmentally safe maritime transport requirad for other

In general. Environmental Assessment components.Category: To Be Determined.

I

-~ ~ ~ ~ ~ ~ ~ ~ ~~~-5 Member Country. Amount &Implementing Probable Stage of Processing andAgency Lender 2 Project I Consulting Services Action on Procurement

Korea Maritime and 100.0 (5) Ports Development end Environmental Consulting services will Appraisal missionPort (Bank) Implementation - Projact vill include be required for vessel scheduled for FebruaryAdministration the following components: traffic management and 1994.

(a) construction of new Port of De4aepo constructionand industrial areas (b) designing and supervision.construction of ship waste disposalfacilities; (c) financing containerhandling equipment for Pusan Phase IVterminal; and (d) designing andinstalling a Vessel Traffic ManagementSystem. Environmental AssessmentCategorv A.

To be determined 100.0 Pusan Urban Transport - This project To be determined. Appraisal mission(Bank) would demonstrate how capacityl tentatively scheduled for

efficiency of an existing transport February 1994.system can be -aximized by implementingen integrated strategy of travel demandmanagement, inter-modal facilityconstruction, and transit capacityexpansion. Institution buildingcomponent of project will focus onimprovement of planning and programingcapabilities of existing institutions.Environmental Assessment Category B.

Xinistry of 90.0 (R) Environmental TecInology Development Consulting services in Negotiations completed.Science and (Bank) - Project will finance equipment to the form of visiting Board presentationTechnology strengthen capacity of selected national individual experts in scheduled for January 4,

research institutes and the Ministry of environmental *cience 1994.EnvLronment to address environmental and technology will beissues and improv environmental required.research and development capacity.Project will also finance experts andoverseas training and library materials.Environmental Assessment Category C.

Governmrnt of 100.0 (R) Financial Intermediation - The To be determined. Negotiations completed.Kore-, (Bank) project will: (a) support the Board presentation

Governmentis program for deregulating scheduled forthe financial system end strengthening December 23, 1993.the banking system; (b) provide long-term credit through eligible banks tosound private enterprises; and(c) support institutional buildingprograms of participating banks andstrengthening technical capabilities ofregulators. Environnmental AssessmentCateaorv C.

Ministty of 190.0 (R) Science and Technical Education - Consulting services will Negotiations completed.Bducationlaorea (Bank) Will finance equipment to support not be required. Board presentationBasic Science quality improvement in science and scheduled for January 4,Center (KBSC) engineering programs in selected 1994.

universities, in the open universities,and in vocational high schools andjunior colleges. Will also improve theresearch capacity of XBSC. Long termpolicy issues in science and technologyeducation will be addressed.EnvironmentaL Assessment Catetory C.

56

Member Country, Amount &Imlmenting Probable Stage of Procesing andAgency Lender Project Consulting Sarvices Action on Procurement 4

REPUBLIC

Ministry of 30.0 (N) Highway Improvement II - Project Consulting services of Negotiations scheduledCommsunications, (IDA) wLll includet (e) upgrading of approximately for February 1994.Transport, Post maintenance capability of MCTPCi 340 personlmonths willand Construction (b) upgrading of 135 km of Route 135 be required.

between Savannakhet and Paksei end(c) technical assistance and training.Environmental Assessment Cateeorv B.

Ministry of 40.0 (R) Structural Adjustment III - Project Consulting services will Identification under way.Finance (IDA) will assist with government be required.

institutional strengthening in the areasof: (a) public administration,including civil service retrenchment;(b) financial supervision; (c) stateowned enterprise (SOE) privatization$and (d) public expenditure management.Components (a) and (c) includeassistance with social safety nets.Environmental Assessment Cate2cory C.

Ministry of 20.0 Lend Titling - Support for government Need for consultants not Project identificationFinance (IDA) program to isue land titles and improve yet determined, under way.

land management. EnvironmentalAssessment Cate-orv: To Be Determined.

Provincial 10.0 (R) Luang Namtha Provincial Consultants have been Appraisal compl-ted JuneGovernment of (IDA) Development - To initiate a pilot selected for project 1993. NegotiationsLuang Namtha provincial development scheme by preparation. Consulting postponed until January

addressing som of the urgent services will be 1994.development needs in the project's required for projectprovince, and by supporting income implementation.senerating activities for povertyalleviation. Environmental AssessmentCategory B.

Bank of Lao PDR 15.0 (R) Industrial Credit II - A line of Consulting services will Appraisal mission(IDA) credit through the Bank of Lao and be required for: scheduled for November

selected commercial banks for (a) technical assistance 199.modernization and expansion of private for financial sectorsector enterprises, and support with reform; (b) training fortechnical assistance for strengthening term lending, andfinancial institutions, legal regulatory (d) technical assistanceframework as well as support services to strengthen supportfor industry. Environmental Assessment infrastructure forCategorY B. industry.

Department of 10.0 Northern Agricultural Development and To be determined. Project preparation underForestry and (IDA) Watershed Management - To extend the way.Entvronment, approach and methodology of the UplandMinistry of Agriculture Project to Luang Prabang,Agriculture aad Oudomsay and Phonsaly northernForestry provinces, especially emphasising

environmental issues and povertyalleviation. Environmental AssessmentCategorv B.

- 57

Member Country, Amount tImplementing Probable Stage of Processing and

Agency I Lender 2 Project I Consulting Services Action an Procurement 4

LAO. PEOPL'S

(Cont d)

Ministry of 8.7 (R) Forest Management and Conservation - Consultants provided Board presentationAgrLculture & (IDA) To assist Government offorts for through FINNIDA and GEF scheduled for February

Forestry sustainable forest management and cofinsncing. 1994.

conservation, including development of

improved legislative end institutionalframework, implementation of programs inforest inventory and planning andsustainable management and conservation,end technical assistance and training.Environmental Assessment Catexorv D.

Ministry of 20.0 (R) Education Sector Development - To Technical assistance Approved by the Executlve

Education and (IDA) tmprove quality and efficiency of basic will be required for Directors on April 27,

Sports education through: implementation of implementing the project 1993. Credit was signed

new curricula and instructional in the following areas: on September 24, 1993.

materials: rehabilitation of school curruculum and Effectiveness expected

infrastructure- developing technical Listructional materials end December 1993.

skills in planning, monitoring and development, textbook (Cofin&ucing by the Swiss

evaluation; and strengthening of printing and Development Cooperation

administrative and managerial capacities distribution, and by the Royal Ministryat central and local levels, pedagogical support, of Foreign Affairs of the

Environmental Assessment Categorv C. school construction, Kingdom of Norway.)educational planning,monitoring andevaluation, educationaladministration andmanagement, and projectmanagement.

Ministry of Health 18.0 First Health - To reduce the high Technical assistance is Appraisal mission

end Social Welfare (IDA) incidence of preventable communicable required for completed.diseases in two priority provinces and implementing the (Cofinancing being sought

of malaria in eight provinces. Increase project. for implementation.the efficiency of health servicesdelivery through strengthening selectedprovincial and district systems andinfrastructure, and strengthening healtheducation. Envirormental AssessmentCategory C.

Rubber Industry 70.0 (R) RrSDA II - Follow up to RISDA I. Consulting services will Negotiations scheduled

Smallholders (Bank) Project will pursue the objective of be required during for December 15, 1993.Development increasing the productivity and project implementationAuthority efficiency of the rubber smallh'older for computerization,

subsector and assisting RISDA's strengthening of

institutional improvement to help cooperatives,

achieve this objective. Environmental improvement of humanAssessment Catexory B. resource management and

strengthening of thegraphic capacity of thecommunications unit.

- ~ 58 -

Member Country, Amount -Implementing Probable Stage of Processing and4Ancy t Lender 1 Project $ Consulting Services Action on Procurenmnt 4

(Cont'd)

Ministry of Health 50 0 (R) Health Development - To improve the Consultants appointed Approved by the Executiveand Chemistry (Bank) capacity to monitor environmental health for project preparation Directors on December 24,Department of the and lnfectious diseases, enhance equity and implementation, and 1993.Ministry of in access to health development through financed by Japan T.A. (Japan T.A. GrantScience, primary health care, support health Grant Factlity. Facility has boenTochnology and the development through use of appropriate approved for projectEnvironment health technology, and to strengthen preparation.)

Ministry of E*alth's institutionalcapacity through mana-ement andpersonnel training, health technologyassessment and quality assurance,occupational health and other policydevelopment. Environmental AssessmentCategory C.

To be dotermined 10.0 Education - Project will aesist the To be determined. Project identification(IDA) national fellowship program (all under way.

*ectors) with teacher and medicaltraining, end secondary expansion andmanagement training. Envilgron xtalAssessment Catecoryv To Be Determined.

Ministry of Roads, 30.0 (R) Infrastructure Rehabilitation - Consulting services will Appraisal miasionTransport and (IDA) Project's main components arte be required for project completed.Comaunications (a) acquisition of apare parts and implementation Negotiations scheduled

equipment to: (1) rehabilitate railway assistance, development for April 1994.fleot, urban buses/trolleys, trucks; of market-oriented(ii) upgrade maintenance and repair policies, laws andworkshops for these transport modes; regulations for trucking(iii) reconstruct failed sections of sector development,paved road networks (b) institutional railway businessstrngtheninag of railways, urban planning costing andtransport, road tranaport end highway urban transportinstitutionst and tc) related studies restructuring endand technical assistance. Environmental corporatizatioz, andAssesament Category B. improved maintenance

systems in roads andurban transport.

Ministry of 10.0 (R) Agricultural Development - The Consulting services will Second preparationAgriculture end (IDA) project would iacrease the supply of be required for mission scheduled forFood staple foods through the rehabilitation technical preparation of March 1994.

of state farms, produce storage, proposed project.marketing and distribution systems. Itvould also include actions to strengthenmanagement of grasslands. Technicalassistence and training would beprovided. Environmental AssessmentCategory: To _e Determined.

-~ ~ ~ ~ ~ ~ ~~~~-5 Hember Country, Amount &Implementing Probable Stage of Processing andAgency I Lander I Project $ Consulting Services Action on Procurement 4

PAPUA UR (UT

To b- determined 30.0 Telecom IV - To support the To be determined. Identification under way.(Bank) restructurLng of the Post and

Telecommunications Corporation (PTC)into a more efficient and commercialorganization, assist the Government'seffort to privatise PTC, and support theGovernment's investment program in thetelecom sector to accelerate economicdevelopment. Environmental AssessmentCategory B.

Department of 11.0 (R) Petroleum Exploration Technical Consulting servLces will Negotiations completed.Mines and Energy, (Bank) Asslstance - Technical and *conomic be required for Approved by tha ExecutiveGovernment of studies for evaluation of downstream technical and economic Directors on December 9,Papua New Cuinea projects, and strengthening of studies, review of 1993.

institutions involved with petroleum procedures, andexploration and development, institution building. Retroactive financins ofEnvLronmental Assessment Cateeorv B. up to USSO.4 million has

been pronosed.

Department of 10.0 Forestry - To support institutional To be determined. Preparation may beForestry (Bank) restructuring of the forestry sector, delayed depending on

training, the establishment of Government action onlandowners, trust funds, conservation issuing Forestryarea identification, and other Development Guidellnes,components of the national forest plan. and allocatingEnvironmental Assessment Categorv A. supplemental budget

funds.

Subic Bay 40.0 (R) Subic Bay Freeport - Project will To be determined. Appraisal mission is inMetropolitan (Bank) replenish equipment and carry out works the field.Authority (SBHA) and services in order to convert Subic

Naval Base for commercial use.Environmental Assessment Catetorv y

Iational 75.0 (R) Water Resources Development - The Selected consulting firm Project identificationIrrigation (Bank) project will support a time-slice of for project preparation completed.Administration NIA's investment program for improvement (to be financed by a Japanese Grant approved(NIA) and repair of national Irrigation Japanese Grant) invited for project preparation.

systems and of local governments' for negotiationsprogram for construction and December 8, 1993.rehabilitation of small-scale, comuunalirrigation systems. It will alsosupport policy and institutionalreforms, including measures to initiateimproved national water resourcesplanning and use, and Lmprovedirrigation investment programming.Environmental Assessment Category B.

- 60 -

Member Country, Amount IlIpl emnting Probable Stage of Processng and

Agency Lendr Project Consulting Services Action on Proeurement 4

(Cont'd)

Land aink of the 100.0 (R) Rural Finance II - Project vill be Consulting services will Appraisal mission

Philippines (Bank) implemented over five years, and has bs required for schedulod for May/JunA

three components: (a) Countryside Loan technical assistance 1994.

Pund (CLF) 2nd phase - provision for during projectadditional funding for the ongoing CL?I impiemntation.and (b) Institutional strengtheningprogram - strengthening Land Bank of thePhilippines (LIP) financially andorganizationally to ensure itsaustainability in providing financialservices to the rural population and(e) technical assistance component,aiming at enhancing: (1) LBP' a grarianability to prepare, appraise, andpresent sub-projects for CL? financing.(ii) PPIs ability to prepare, appraise,

and present sub-projects for CLFfinancinsg and (iii) environmentalaspects of sub-projects. EnvironmentalAssessment Catetory B.

National Power 300 0 Casenan Transbasin - The objective of Consultants are A preparation mission bas

Corporation (Dank) the proposed project is to meet the reviewing options to determined the project in

power demand in medium term and improve improve the project feasible, but anotheragricultural productivity, economic feasibillity, option, including use of

Environmental Assessment Category A. vater for agriculturewill be studied by anItalian agent.

To be determined 100.0 Industrial Efficiency and Pollution Consulting services will Proj-et preparation under

(lank) Control - The objective of the proposed be rsquired for waste vay.project is to reduce industrial vater treatment systems.

pollution in Metro Mantla throughstrengthening of the institutionalframework and investment in pollutionabatement. Environmental AssessmentCateaorv B.

To be determined 36.0 Environment and Natural Rescurce To b- determined. Project under(ank) MaLagement II - Upland and coastal preparation.

resoures management and livelihoodimprovement in four provinces, as followup to Central Visayas Regional Project.Environmental Assessment Category S.

Department of 25.0 (R) Womm' a EaLlth and Safe Motherhood - To be determined. Pra-appraisal misston

Eealth (Bank) To improve thc reproductive health of *schduled for Februry

women through: (a) expansion and 1994.

str ngthening of women's health end safemotherhood servioes (including familyplanning); (b) strengthening core DOEend local government health units tomanage these services; (C) promoting

collaboration between Government, NGOsand local governmental units to improveaervieos; and (d) testing new ways todeliver women's health services andmeasure Impact. EnjrongentalAssessment CatemorY C.

- 61 -

Member Country, Amount &Implemnting Probable Stage of Procacsing andAgency Lender Project Consulting Services Action on Procurement e

PHILIPPIWES(Cont d)

National Power 213.0 (R) Leyte-Luzon Geothermal - Project Blids have been received Appraisal completed.Corporation and (Bank) will meet increasing power demand in for submarine cable, Negotiations scheduledPhilippine Luzon at lowest cost by utilizing transmission line and for January 1994.National Oil geothermal resources in Leyte. Project convertor. (A USS30.0 million grantCompany would include: (a) development of Leyte from the Global

Geothermali (b) construction of about Environment Facility440 MW power generating capacity by (GEF) is being proposed.)build, operate and transfer (BOT); and(c) Leyte-Luzon transmission line.Environmental Imoact Assessment (EIA)summarv distributed for 350 MW. in June1992 and expanded to 640 MW on June 22,1993. Environmental Assessment CategoryA.

Department of 150.0 Export Development - Project vill To be determined. Project has been placedTrade and Industry (Bank) support measures to accelerate on hold.(DTI) development of exports including export

finance/guarantee, infrastructural, andinstitutional support. EnvironmentalAssessment CateRorV C.

National Power 195.0 (R) Leyte-Cebu Geothermal - To meet Final engineering Negotiationa completed.Corporation and (Bank) increasing power demand in Cebu at complet-d. Bidding Board presentationPhilippine lowest cost by utilizing geothermal ongoing, scheduled for January 25,National Oil Co. resources in Leyte. Project vill 1994.

include. (a) development of Leyte A major reform program,Geothermal Field; (b) construction of including institutional,about 200 MW power generating capacity corporate and financialby build, operate and transfer (BOT); measures, is under way.and (c) the Leyte-Cebu transmissionline. Envlronmental Imnact Assessment(hIA) summary for 350 MW distributed inJune 1992 and exoanded to 640 MW onJune 22. 1993. Environmental AssessmentCategory A.

Metro Manila 80.0 Metro Manila Solid Waste Management - Local conxultants have Pre-appraisal ims ionAuthority (MMA) (Bank) Would include: (a) development of two been engaged. scheduled for February

sanitary landfills; (b) construction of 1994.four transfer stations; (c) procurementof transfer trucks and equipment forlandfill operations; (d) rehabilitationof maintenance workshops; and(e) technical assistance for operationsand management of solid waste operationsand related studies. EnvironmentalAssessment Cateaory A.

Local Water 40.0 Water Supply, Sewerage and Sanitation Consultants have been Project preparationUtilities (Bank) Sector II - To assist the Government in selected for feasibility ongoing.Administration meeting basic needs of urban population studies and designs. (Japan Grant Facility for(LWUA) through provision of safe, adequate, Consultants for the sectoral reform study

easily accessible water supplies through formulation of aectoral, approved.)implem ntation of extensions of systems institutional andin some 50 towns. Institutionally, the financial reforms,project would seek to accomplish major including privatization,sectoral and in.titutional reforms to will be required.improve the capabilities and sustaina-bility of urban vater supply operationaand maintenance, development, financingand cost recovery. The feasibility ofprivatization would be considered.Environmental Assessment Cateaorv B.

-62-

Member Country, Amount &Inplemnting Probable Stage of Processtng a"Agency a Lender t Project Consulting Service Action on Proaurement "

(Canted)

Department of 70.0 (R) Urban Health and Nutrition - To Consulting services vlll Approved by the ExeutiveBoalth (IDA) assist the Government to expand and be required for Directors on June 8,

improve public health end nutrition impleomntation. 1993. Credit was signedservices for high-risk urban slum on November 22, 1993.dvellers, especially women and children,in Metro Manila, Cebu and Cagayan deOro. Environmental Assessment CategoryCt.

Department of 100.0 Rural Infrastructure - To reduce poverty To be determined. Proj et components underPublic Works and (Bank) end accelerate development in the rural diusssion. Date of pre-Nighways (DPWE) areas through: (a) provision of basic appraisal mission Is to

Infrastructure (rural roads, minor be determined.drainages, ete.) through improvedtargeting of DPWa investments ln linewith the geographical distributlon ofpovertys and (b) mployment generatLonin eonstruction through increased civilvorks. Envlronmntal AssessmentCatelaorv S.

Department of 30.0 Technology Development - The project Twinning arrangements Appraisal missionScience and (Bank) would stLmulate more rapid technology required for proj-et scheduled for *id-Technology development ln industry through building Implementation. February 1994.

links between key technologyInstitutions and industry, and throughcreation and restructuring of keyInstitutions in the technologyLnfrastructure. No adverseenvironmental effects. EnvronmentalAssessment Catesorv C.

Provincial 50.0 (B) DLstributLon System Relnforcement - Consulting servLees vlll Negotiations under way.Zlectricity (Bank) Project vill improve and *xpand the sub- be required for PEA for: board presentationAuthority (PEA)' transmLision system in the Northern (a) corporatLgation1 and scheduled for mid-January

provinces end complete the last phase (b) technical design. 1994.of PEA's rural electrification project.Enviroonental Assessment Categorv A.

Ministry of 60.0 (R) UnLversity Science and Engineeiing Consulting servlces will Preparation under way.Univerasty Affairs (bank) Education - Project seeks to Lmprove the be required for now

quality of science and engineering course developmnt.education through faculty upgrading, newcourse development, strengthenLng ofinformation services, and upgradinglaboratories. EnvLronmental Assessment2&&2ff;rT C.

Department of 90.0 Lend Titling III - The project will To be determined. Project preparation underLands (lank) support the third phase of the way.

accelerated national, cadastral mapping (Cofinanclng of aboutand land titling program, including VS$i0.0 million Iseadastral surveying and mappLig, expected.)issuance of land tLtles, improvement anddecentralization of land administration,and institutional strengthening of theDepartment of Lands and CentralValuation Authority. EnvironmentalAse_ssment Cat-eorvt To Be Determined.

-63

Member Country, Amount Implementing Probable state of Process ing andAgency ILender Project 'Consulting Services Action on Procurement4

(Cont-d)

Electricity 100.0 Lam Takhong Pump Storage - To meet the ConLsultants have already Review of ZIA byGenerating (Bank) peak demand of the Thai power system boon selected. Government pending. Pr.-Authority of from 1997. The project comprises appraial tentativelyThailand (ECAT) construction of a hill-top reservoir and scheduled for March 1994.

installation of 2 x 250 MW pump -turbina generators. ErvironmentalAssessment Catestor- A

Petroleum 180.0 Second Ga; Transmission - To construct Consultants have already App-raisal completed.Authority of (Bank) submarine pipeline for transporting been selected. Appraisal report underThailand (PAT) natural gas from the Gulf of Thailand to proparation.

consuming cities in the Bangkok area.Environrmntal Assessment Cateaory A.

Electricity 100.0 Mae L-B Water Diversion - The project's To be determined. A feasibility study is inGenerating (Bank) main objective is to increas, the energy Progress.Authority of and demand potential of the BhumibolThailand (SCAT) Hydro Electric Project. It will involve

const'ruction of two rockf ilL dams, a20 XM diiversion tunnel and a 600 MWpumped storage scheme. Envi'ronmentalAssessment Category A.

Ministry of 70.0 Industrial Pollution Control - To treat Contract withx At Gveromentss request,Industry and (Bank) industrial vaste water, and hazardous consultants signed March project processing hasMinistry, of resmidues which are most serious 1992. EEC grant for been delayed.Science, environmental risks for the country and preparatory studiesTechnology and the Gulf of Thailand. Also, financing awarded January 1993.Environment of an institutional training program to

strengthen capacities of environmentalauthorities, and for an emergencyresponse program for the easternseaboard. Environmental AssessmentCateoy.

Minist-ry of 30.0 (R) Conservation Forest Area Protection, Limited external Project preparationAgriculIture and (Bank) Management and Development - Projec-t consulting services will completed. Pro-appraisalCooperatives. consists of two major components: be -required for stupport scheduled for FebruaryOffice of the (a) the demarcation, Protection and of environmental 1994.Permanent appropriate management of priority assessment to Primarily (GUI funding being soughtSecretary. Royal conse-rvation forests, wildlife be undertaken by local for component (a). endForestry sanctuaries and national parks in the consultants and bilateral assistance forDepartment.(RFD),* Thuns Yai Huey Ka Xaeng Complex; and institutes. enviroiouaetalAgricultural Land (b) support of integrated conservation asseemment.)Reform Office area development approaches for villages(ALRO) adjoining vulnerable buffer zone areas.

Environmental Assessment Category A

To be determined 10.0 Education II - Project will improve and To be determined. Project identification(IDA) strengthen the education system, expand under way.

access to secondary schools, undertaketeacher trainxing and upgrading, supportcurriculum development, and supply ofeducational materials, and managementPlaning. Environmental AssessmentCateaorvyt To Be Determined.

M"ober Country, Amount &Impl menting Probable Stage of Processirg andAgency Lender Project Consulting Services Action on Procurement

To be determined 100.0 Structural Adjustment I (SAC) - Th To be determined. Project under(IDA) first structural adjustmont credit preparatlon.

proposes to help finance the country'sbalance of payments due to the Lmpact ofeconomic reforms and tradeliberalization. Potentialconditionality includes thestrengthening of public sectormanagement and supporting thedevelopment of key lnstitutions neededfor the merging market economy.Project would also address Lmportantissues of fiscal policy, the incentiveregime (including trade lLberalLzation),financial sector reform, and stat-enterprise reform. Trade reform is nLmportant priority. EnvironmentalAssessment Cateaorv: To Be Determined.

Ministry of Water 80.0 (R) Irrigation Subsector - Consulting services Project prepared byResources (IDA) RehabilLtatlon and completion of six or being provided under FAOJCP with bilateral

more selected irrigation schemes located bilateral technical assistance. Pr.-in the central part of Vlet Nam. assistance. ppraisal missionInstitutional strengthening of the schsduled for JanuaryMinistry of Water Resources. 1994.Environmental Assessment Catetory A

MinLstry of HEalth 70.0 (R) Basic Haalth Serviees - Project Substantial consulting Preparation is at an(IDA) would strengthen Govermnt's a srvices will be dvancd stage. Date of

institutional capacity to address rapid required in the areas of pro-appraisal missLon ischanges in the health sector and would training, manageamnt, to be deterined.support short-term measures (including information systems,drugs, equipment, and training to supervision, andimprove delivery of six basic health procurement ofprograms. Prospective activities would equipment.be implemented in 10 provinces throughthree components. (a) institutionaldevelopment; (b) rehabllitation of basichealth servLces in seven provincesa and(c) malaria control in three provinceswith the most sarious malaria situatlon.Enyiro_mental Assessment Cateaorv C.

National Committee 70.0 (R) Population and Family Health - Need for consultants not Project has beenfor Population and (IDA) Project will conslst ofs (a) family yet determined. Idsntified. PreparationFamily Planning planning and family health services under way.

package (including services, training,contraceptives and equipment, IZEC andsocial marketing)a (b) institutionalstrengthening (of both coordinating/implementing institutions, as well asmass organizations)l and (c) developinganalytical capacity (including research,MIS, policy formulation, evaluation).Environmental Assessment Catexorv C.

- 65 -

Member Country, Amount &Implementing Probable Stage of Processing endAgency Lender 2 Project Consulting Services Action on Procurement'

(Cont d)

Ministry of 70.0 (R) Primary Education - The project s Conxulting services will Approved by the ExecutiveEducation and (IDA) main components are to. (a) improve be required in the Directors on October 26,Training quality and relevance of prLmary following areas: 1993. Credit was signed

education by providing essential inputs (a) project management on November 1, 1993.needed (textbooks, teaching aids, bettor (administratlve andtraining teachers, and the specialized financial aspects);approach required for ethnic minority (b) multigrade teaching;children) and supporting introduction of (c) bilingual educationsa uniform school day end sehool year for (d) ethnic minorityall regular primary cl-asses education; (e) socio-(b) rehabilitate infrastructure and linguLstic analysis;extend acCe-ss and (c) improve the (f) educ-tion managementmanasement of primary education. information systems$Environmental Assessment Cateeory C. (g) school mappings

(h) education planning,fi) textbookpublication,

distribution, endmarketing, (t) schoolconstruction; end(k) educationalassessment.

Ministry of 105.8 (R) Agriculture Rehabilitation - The Approximately 375 months Project has beenAgriculture and (IDA) project would reconstruct the of consultant servicLes ppraised. NegotiationsFood Industries, agriculture support services of would be required both in progress.Viet Hem Bank of extension, plant protection and short and long-term,Agriculture research; begin the process of foreign end local, in

rehabilitation of the agricultural human resourcecredit system; and rehabilitate rubber development, creditproduction. Would also include management and rubbertechnical assistance end training, processing.Environmental Assessment CategorY B.

Ministry of 145.0 (R) Highway Rehabilitation - Project Consulting services Approved by the ExecutiveTransport Project (IDA) will include: (a) rehabilitation of approximately Directors on October 26,Management Unit Highway IA between Hanoi and Vinh 5,000-6,000 weeks will 1993. Credit was signed

(279 km) end between Ho Chi Minh City be required. on November 1, 1993.end Can Tho (151 km)s (b) improvementsto ferry operations on Highway IAbetween Ho Chi Minh City and Can Tho,including new ferry boats; and(c) equipment for road maintenanceoperations. Environmental AssessmentCategory B.

To be determined 10.0 Education - To improve and strengthen To be determined. Project identification(IDA) the education system and management under way.

planning. Environmental AssessmentCatezory: To Be Determined.

- 66 -

MXmber Country, Amount &Implemnting Probable Stag* of Processing and

Agency' ' Lender Project ' Consulting Services Action on Procurement 4

ml. 2RUPE AID MTUhL ASIA RBGIO

National Roads 12.0 (N) F-eder Roads - ProJect includest Consulting services vill The Feeder Roads Study,

Department, (IDA) (a) Lmprovement of 1500 km fe-der roads Include supervision of the basis of the projeot,

Ministry of using labor-intensive methods; (b) a works -- technical vill start early JanuWary

Transport and program of periodic maintenance by a*eistance to Road 1994. Completion

Cocnunications contractorst ac) tools and equLpment for Department, local expected in six months.labor intensive vorks; and (d) technical government associations, (Cofinanaing is to beassistance to help strengthen and contracting determined.)

preparation end implementation of labor- industry.intensive progrms, and to advise roadsdepartment, local governmentassociations, nd the privatecontracting asgncy'. EnvironmentalAssessMnt Catesorv S.

Ministry of 5.0 (R) Irrigation Rehabilitation - Cn utins services vill Pro-appraical cpleted.

Agriculture and (IDA) Components would comprise: be required for PPF Appraisal mission

Food (a) rehabilitation of Irrigation and activities (preparation schedulod for late

drainsa infrastructure in selected of bidding documtnts, Decomber 15, 1"3.

hlgh-potential agricultural areas procurement and cost(b) institutional developmentl accounting for public(c) policy' support; and lrrigation utilities).(d) Siplementation support.Enironmental Assessment Cateorw S.

Ministry of 7.0 School RehabLltation end Technical Need for consultants not Pro-appraisal eawleted.

Education (IDA) Assistance - Components would comprlse yet dtermind. Apraisal mission

(a) school rehabilitationt (b) initial tentatively scleuled for

restructuring of textbook provision Januacr 1994.

mehanism; (c) technical assistance forplanning and design of medium-termsector restructuring and investmentprogram. mireonmental ssesmtCateosor C.

Ministry of 4 0 (R) Tax AdminLstration - To assist ln Two long-term Appraisal report under

Finac-e and (IDA) the implementaton of the tax and custom consultants preparation.

Economy department institutional strengthoniag (one for tax) to be

progrms as wll as by providing support hired under PPFneeded to establLsh efficient tax arrangement.collection, audit, and Informationsystem. Envirotmental Assess5mntCatogorv C.

Ministry of 15.0 (R) Enterprise and Financial Sector Consulting servlces vill Appraisal mission

Finance and (IDA) AdJustment (EPSAC) - Rsform and policy not be required, tentatively scheduled for

based loan to support the restructuring February 1994.of the public enterprLse and bankingsectors, end developmnt of framvorkfor enterprLse operations.Environmental Assessment Catesorv U.

-67

Member Country, Amount & state of Processing a"IMInpl contt ProbableAgSny L uder a Project ' Consulting S.vvicLs Action on Procurement '

(Ccnt'd)

AlbaniSn 10 0 (R) Power Loss Reduction - Project vill Consulting services are Appraisal missionXlectricity (IDA) help tot (a) reduce non-technical nearly finished fort tentatively scheduled forCorporation electricity lossest (b) reinforce (a) preparation of an March 1994.

distribution networks in selected areast action plan to reduceand (c) provide technical assistance to non-technicalprepare a housing code. Invlnmntal electricity lossest andAssessment Catesory B. (b) ldentifLeation of

eleetricity distributioninvestment.

ministry of Nealth 10.0 (R) halth Services Rehabilitation Consultant selection Pro-appraisal completed.(IDA) (formerly Health Rehabilitation) - und-r way. Appraisal mission under

Project would assiat the Governmnt in preparatton.rehabilitating, maintainizg andoperating easential health servlies andundertaking the investments and studiesneeded to initiate long-term reform inthe health sector. EnvoronaentalAssessment Catesora C.

Durres Water Works 10.0 (R) Durres Water Supply Rehabilitation - Consultants have been Appraisal report under(IDA) Supply, transmission and distribution selected, preparation.

system rehabilitation, Project willeliminate vater shortages and assocLated Retroactive financin& ofhealth risks, and strengthan the Up to USS1.0 million mayextating water works management. b- ruired.Environmental Assessment Category D.

Ministry of 30.0 Irrigation Rehabilitation - The project Consulting services will Appraisal report underAgriculture Jank would support the rehabilitation of be required. preparation.

irrlgation infrastructure throughout thecountry. Environmental AssessmentCategory: -To Se Determined.

MLniatry of the 28.4 Earthquake Reconstruction - Projct vill Consultant selection ftgotiations completed.gZonomy (IDA) reconstruct key infrastructure and under way.

housing needs and create employment in 12troactivM financin ofthe earthquake sne. Environmental Mn to US2 .0 millionAssesment CAtesorvs To Be Determine d Dfct9Ad

Ministry of Enrxgy 24.0 (k) Power Rehabilitation - Conxulttng servicess Appraisal missionand Fuels (IDA) Rehabilitation of two thermal power being contracted. scheduled for Apr.l1 1994.

plants end the electricity distributlonnetwork, and technical assistence forpolicy and lnstitutional reform.Environaontal Asgessment Cattgory: ToBe DtermineLd.

To be determined 40.0 (R) Gas Rehebilitation - This project Consulting services vill Project has boen placed(Bank) vill include investment in be required for project in the FY95 larding

rehabilitation of existing natural gas preparation. program. Furtherpipelines, end measures to Lmprove reporting vill beefficiency in gas utilimation and discontinued.rohabilitation of old oil fiLlds.Environmental Assessment Category: ToBe Determined.

- 68 -

Member Country, Amount &A.plm _ tdng Probable Stage of Proe ssing and

4 ner * L nder t Project $ Consulting Services Action on Procurement 4

(Cont'd)

To be detrmined 20.0 (R) Energy Technical Assistance - Consulting services will Appraisal mission(Bank) Project will: (a) procure advisory be roquirod. scheduled April 1994

service for projects involving foroign remains uncertalA pendingpartners and for the oil export pipeline Government's confirmationproJect; (b) strengthen the state oil of interest in project.company capacities to manage industry innew business environment, and(c) provide technical assistance forinvestment planning and Institutionaldevelopment in natural gas and power.Environmental Assessment Categorv A.

Center for 15.0 (R) Institution Building - Project will: Consulting services wlll Appraisal missionZoonomie Policy (Bank) (a) finance urgently needed technical be required for project scheduled for Novemberand International assistance in designing and preparing implementation. 1994 remains uncertain

Cooperation programs for reform of financial sector, pending new Covrnwment'ssocial safety net, privatization and clarification ofenterprise restructurings and priorities, and(b) strengthen domestic capacity to confirmation of interestimplement reforms. Environmental in project.Assessment Categorv C.

US

Ministry of 75.0 (N) A4riculture Reform support - Project Need for consultants not Identification under way.Agriculture and (bank) will restructure farm and agricultural yet determined.Food production. Environmental Assessment

Cateorv: To la Determnd.

To be determined 75.0 (R) Private Enterprise Development - Need for consultants nwt Project preparation under(-ank) Project will support private sector yet determined, way.

development (PSD) and will consist of:(a) a financing component forenterprises, (b) a package of policy,regulatory and institutional reforms forestablishing an cnabling environment forPSD, and (c) technical assistance andequipment for institution building.Environmental AsSeS3ment Cate*orvy ToB- Determined.

To be deteamned 50*0 Waste Management - The project vill Need for consultants' not IEPS tentativelr(Bank) provide: (a) rehabilitation/expansion yet determined, scheduled for Juue 1994.

of wastewater treatment plants,(b) construction of a centralizedhazardous waste treatment plant andfacLlity; and (c) purchase ofenvironmental monitoring/laboratoryequipment. Environmental AssessmentCategory: To Be Determined.

Minlatry of 50.0 (R) Forestry Development - The project Consulting se-rvLces will Negotiations tentativelyForestry (Bank) vould support restructuring of forestry be required. scheduled for January 18,

sector vith an objective to improve 1994.natural resource management and increaseforestry output. EnvironmentalAssessment Catsaorv A.

- 69 -

)(ebor Country, Amount ioplementing Probable Stage of Proc0assl.a nd.Agency I Lender' Project Consulting Services Action on Procurenent 4

(Cont d)

To be datermined 75.0 (R) Energy Efficiency -Rhabilitation Consulting services vill Project preparation under(Back) of district beating systems and thercml be required. way.

pover systems. Environmental Assossment52tosROmy B.

To be deteinend 8.) (R) Institution Building - Project will Coasultitg services vill- Approved by th Ex cutLve(Bank) finnmec capacity building activities of be required. Directors on July 29,

the Government. Enviromeental 1993. Loan was signed onAssessment Category C. August 13, 1993.

To be determined 50.0 Labor/Social Protection - Project vlil Cansulting servicae vill IEPS scheduled for ond(BeAt) provide: (a) strengthening of be required. January 1994.

employmnt programso (b) reforms ofpension and cash benefits systewl - r.

(c) monitoriAg of labor market andliving standards of the populationl and(d) health sector restructuring.Invironmental AssessxMnt CatexorE C

To be determined 120.0 R-habilitation - Project vwil finance ConsultLng services will Approved by the Executive(Bank) essential Imports to maintain production be required. Directors on November 16,

in key sectors during early period of 1993.economic reform. EnvironmentalAssessment Categorv: To B- Determined.

Ministry of 100.0 Transport - The project vill assist NRed for oonaultanta not Preparation under way.Transportation (lank) restructuring of the railways in order yet determind.

to reducs the burden on publitc sectorfinances and imprve their efficiency.It vill likely finance: (a) maintenanceand rehabllitation of infrastructure,traction and rolling stockt(b) hardvare, software and technicalassistance for Management informationSysteam; and (c) a telecommunicationrntwork and intermodal facilities.Environmental Assessment Category D.

To be deteroined 100.0 Enargy SI - The project will support: Consulting servicos vll Preparation under vay.(bank) (a) rehabilitation of tbe Varna power be required. (Cofinancing vill be

plant; (b) rehabilitation nd required.)strengthening of Sulgargass(c) nvironmental investments at theNefotochim refinety and (d) expandedoutput Lignitc at the Marits East mines.Environmental Assessment Cateaory B.

Ministry of Hea1th 50.0 (R) Health Development - Project vlll Consulting services will Project under(Bank) assist the Governaent in the be requird. preparation.

restructuring of Its health caredelivery system while at the same timensuring the conttnued provision ofcritieal health services during thotrnsition. It vtll include threecoMponents (a) designing sectorreforms; (b) restructuring and upgradingcritical health servlcos; andCc) strengthening health promotion.EnvironMental Asoessment Catezort C.

- 70

Hmber Country Amount £Implementing Probable Stage of Processing andA ncy Leander t Project $ Consulting Services Action on Procurieent'

(Cont'd)

Ministry of Labor 50.0 Zsployment and Cash Ben fits - The Need for consultants not Preparation under way.and Social Wlfar (Bank) project will facilitate the transition yet determined.

to a market economy by promoting anefficient allocation and utiLization oflabor, and *asing, as *efficiently and*ff-etively as possible, the transitions*ocial costs. Environmental AssessmentCatesory C.

Ministry of 98 0 (R) Water Compantes Restructuring and Consultantx have been Negotiations scheduledVegional (Bank) Modernisation (WCRH) - Project will selected. for early January 1994.D-v lopment, assist the Government of Bulgaria in8ousing Policy and restructuring/strengthening water andConstruction sew rate operating companies and in

financing selected water and sewerageinvestments from an agreed three-yearsector investment program for water andsewerage. Environmental Assessment

ministry of 215.0 Debt and Debt Service Reduction (DDSR) - Need for consultants not This is a specialFinanco (Bank) Project Will reduce the external debt yet determined. operations no appraisal

service obligations of the Covernment to mission Is planned.a level compatible with growth and th board presentationrestoration of creditworthinass over the tentatively scheduled formedium-term. Environmental Assessment May 15, 1994.Cateoorv U.

Ministry of About IR) Education - To develop educational Consulting servlc-e will Appraisal report underScilnce nd 65.0 assessment capability, career guLdance not be r-quired. preparatloa.Sducation (bank) services, textbook production and

distribution, and support restrueturingof higher education and research.Environmental Assessment Catesorv C.

Ministry of 150 .0 (R) Financial and Enterprise Sector Need for consultants not Appraisal miss ionFinance, Bulgarian (Bank) Adjustment - To restructure, privattxe yet determined, tentatively scheduled forNational Bank, and develop state-owned enterprlse, and March 1994.Bank Consolidation the financial sector. Enm ronmeatalCompany, Assessment Categorv U. Ftroactive financina ioPrivatization -oxected.A4ency

bulgarian Patioral About (R) Agricultural Development - Project Need for consultants not Appraisal report underBank 50.0 seeks to provide: (a) support for a yet determined, preparation.

(Bank) Wlde range of private iavestments inagriculture, rural development andrelated activities. and (b) technicalassistance to participating banks inappraisal and supervision related sub-proJects. The project would helpestablish a competitive network ofprivate trade and servicos foragricultural equipment and supplies.ESvironmental Assessment Category D.

- 71 -

Nbmber Country. Amount LImplementing Probabl- Stage of Procss "4 endAg Cy I Lcndcr S Projoct ' Consulting Services Action on Procurdment 4

Croatian Roads, 75.0 HiGhwaY Sector - The project would Need for consultants not Preparation under way.Ministry of CZank) fin'ne: (a) A three-year tins slice of yet determined.Maritme Affairs Croatlia's road expenditure and financingand Transportation programs (b) i¢prove road maintenanoe

and road safety, privatize truckingcompanies end road contractors, endreduce road vehicle emissions: and (c) aStudy to prepare to reorganize theCroatian Railways. EnvironmentalAseesement Catsaorv A

Asency for 125.0 Im-rgency Reconstruction - The project Consultant selection Date of BoardReconstruction (Bank) will include the repair of: Ca) war- under way. preoentation is to be

dsmaged infrastructure (roads and Solicitations not determined.bridgee, railways, power, vater, and requested. Localsewerage, end flood control)s consulting services, Retroactive financin2 in(b) replacement of agricultural assets primarily for ShUJisuntof(livestock and equipment): and procurement assistance. UlS25 million i&(C) damaged housing, schools, and he-lth urbnoaed. The fundscenters, as Well as water and power would be used to financenetworks, in a limited number of Lnvestments mado afteroezmunities. Environmental Assessment lebru&r-v l. rocured in

Cataxory S. accordance with Bankb.u

Czech Power 200.0 Second CEZ Powe - The proposed project Need for consultants not Project proparation hasNnterpriae (Bank) would finance eligible foreign exchange yet determined, been discontinued,

expenditures of the Crech Power Company pending receipt of(C0Z) 1993-1995 investment program. The confirmation ofmain components of the project would be% Government interest,(a) Lmprovement of high voltagetrenmission and substations:(b) upgrading of load dispatchingfacilities: and (c) retrofit of severallignite fired power stations.Environmental Asas&emnt Catexory: ToBe D*termined.

To be determined About Environment - Scop- of this operation Need for consultants not Project preparat'Wea bas150.0 Lik-ly to include support for yet determined. been discontinuoat(Bank) institutional development, technical pending receipt 'f

assistance for strategic and pre- confiration ofluvestment studies, and investments in Government interest.areas of municipal services, andreclamtion of mined lands.Environmental Assessment Category

Ministry of the 2.0 (N) EnvLronment - Treatment of Need for consultants not Preparation under way.Environment (Bank) wastewater in Eaapsalu tnd M-teulu Bays yet determined.

with a view to Improving local beachesto improve tourism. EAVIrmonu-Assessment Category S.

72 -

Mbmber Country, Amount &I pw_ emnting Probable Stage of ProcessLag andAgency Lender Project Consulting Services Action on Procurement 4

(Cont'd)

To be determin d 12.0 (N) Highway Maintenance - The project Need for consultants not Preparation under way.(Bank) vill fiuance surface dressing (3500 km) yet determined.

and surface overlaps (200 km) over atwo-year period, to start eliminatingthe backlog of deferred maintenance. Itvill also introdues EMS, assist theconstruction industry, improve roadsafety, and review environmental impactof road maintenance program.Environmental Assessment Catenory ToDe Determined

Ministry of 25.0 (R) Health - Project would support the Consulting services are Project preparation undarSocial AffairJ (Bank) restructuring of the health care system expected to be required. way.

with particular attention to healthpromotion, hospital reorganization,hoalth care financing, healthmenagement, and training. Possibletxtension to cover social insurancefinaneing reform. EnvironmentalAssessment Cateeorv C.

Ministry of 25.0 (R) Agriculture - Project would support To be determined. Project preparation underAgriculture and (Bank) reform and restructuring of the way.Environment agriculture, forestry and fisheries

sectors through policy reforms andinvestments Environmental AssessmentCatetory: To Be Determined.

To be dete-rmin d 20.0 (R) Enterprisel/inance Sector - Project Consulting services will Project preparation under(Bank) would support enterprise and financilal be required. Way.

sector restructuring and prlvatisation,strengthen the financial sector, andenhance its ability to support thedevelopment of the private sector.Envlronmental Assessment Catetorv S.

Min1stxy of 30.0 (R) District UEatlConservation - The Consulting services Project preparation underEconomy and (Bank) project vould: (a) support energy under way with bilateral way.Tallin, Tartu and efficiency improvements and energy funding.P-ru conservation in district heatingMunicipalities, systoms, convert boilers to gas andand Estonian State indigenous fuels and install heat metersPower Company for large consumers; and (b) strengthen

energy lnstitutions. EnvironmentalAssessment Catexory A.

To be determined 30.0 (R) Agricultural Supply Promotion - The To be determined. Further project(Bank) project would support completion of land processing unscheduled.

reform, comercialisation,demonopolization and restructuring ofinput supply; food processing andmarketing distribution enterprises, andassistance to private sector developmentin agriculture. EnvironmentalAssessment Category: To Be Determined.

-73-

Hemb-r Country, Amount &Irplementing Probable stage of ProaOswma endAgency L Lender 2 Project Consulting Service. Action on Procue-ment 4

(Cont'd)

To be determined 1S 0 Institution Building - Project wlll Consulting services vill Date of Board(Bank) finance capacity building and technical bs required. presentation is to be

assistance activities of tho Government determined.to furthar economic reform objectives.En_Uronmentpl Assessment Catesory C.

Mnlistry of 15.0 (R) Telecom - Project seeks to aLd in Consulting services wvii Project preparation underCommunications (Bank) the overall reform process of the be required. wAy.

tdlecom sector. EnvironmentalAssessment Category: To Be Determined.

To be determnuad 300 .0 Enterprise and Financial Sector Heod for consultants not Appraisal mission(Bank) Adjustment (EFSAL) - Loan will support yet determined, tentatively scheduled for

Implementation of a structural reform February 1994.program covering primarily enterprisereform, banking restructurLng, andprivatization. Enxlronmental AssessmentCategory: To Be Determined.

Budapest Transport 75.0 (R) Budapest Urban Transport - The Consulting services to Appralsal report underCompany (BDV) (Bank) project will include the following be determined, preparation.

components: (a) replacement of buseswith low-polluting and onergy-efficientsubstitutes, (b) rehabilitation of 64 kmof worn out tramway tracks and purchaseof track maintenance equipments(c) automatic vehicle monitoring system;and (d) technical assistance andtraining for guidance on variousinstitutional issues. EnvironmentalAssessment Catecor, B.

Ministry of 100.0 Textbook and Higher Education Library - Need for consultants not Project preparationCulture and (Back) The project will support the yet determined, should betgin in the nextEducation transformation of the school and higher 6-8 months.

education textbook system from one ofsingle (public) source publisher, lowquality and poor choice to one of freemrket production, stock augmentationand automation. EnvLrnmeptalAJssssment Catesory C.

Magyar Villemos 100.0 nergy Environment - To support EAprossions of interest Negotiations completad.Muvek Rt (XVM Rt) (Bank) development and implementation of are solicLted from Board presentation

appropriate environmental poliie s in consultants in the field tentatively shoeduled forthe power sector and finance power of humAn resources February 1994.generation, end to upgrade the enrgy developmet, endmanagement system. Eniromental environmntal managemntAsmossment Categorv A. corporate policy.

- 74 -

Member Country, unowt &Impleenting Probable stage of Prooosimg afndAgency Leder 2 Project ' Consulting Serviees Aetion on Procurement 4

To be determined 150.0 (R) Umen Oil Field Rehabilitation - To be determined. Project preparation under(Bank) ProJect will include rehabilitation of way.

Vasn oil field, ineluding pipelineinfrastructure and productSonfacilities. The loan will supportincreasing oil production exports andtax revenue, and will focus on keypolicy reform in the p-troleum sector.Environmental Assessment Catexormr ToBe Determined

To be determined 150.0 Economic Reform Support - To help deepen To be determined. IPS scheduled for(bank) the Oovernment's structural reform March 1994.

program and complement stabilizationefforts through the provision of balanceof payments and technical assistancesupport. Environmental AssessmentCategorvt To 1e Determined.

To be determined 50 0 (R) Buman Resources Development - To be dstermined. ZIPS scheoul-d for early(Bank) Project would assist the human resources February 1994.

deelopmnt program through:(a) buildlng capacity of povertyassessmenti (b) creating a modern socialsecurity schemet (e) enhancing theefficiency of the labor marktt andemployent services; (d) inproving theeffectiveneas of vocational training;(e) introducing a program of publicworks; and (f) improving the health caresystem. Environmental AssessmentCateSorr C.

Mi5istry of 40 °0 R) Urban Transport Services Improvement Consulting services vill Negotiations are underTransport (Bank) - Seeks to restore minimum urban be required for way.

transport capacity in Kazakhstan s thrae implementing sectorlargest cities. and design and Implement policy reforems, andkey improvements in sector policies and strengthening publicinstitutions. Environmental Assessment transport companies.Cateorv C.

Ministry of 80.0 IR) Irrigation - Rehabilitation and Consultant contract has Project preparation underAgricultura (Bank) improvemnt of existing irrigation and been negotiated. vay.

drainae infrastructure. EnvironmentalAssessment Category B.

Ministry of 50.0 CR) Pince and Enterprise Development - Consulting services will Appraisal missioneconomy (Bank) Proposed project will support financial be required for scheduled for February

sector reform and enterprise sector technioal assistance 1994.reform and will consist of; during project(a) equipment and technical assistance implementation.for the reform of the payments systemand bank information technology; end(b) technical assistance and equipmentfor further institution building andbanklenterprise level restructuring.Environmental Assessment Catemory C.

- 75 -

Member Country, Amount &Implementing Probable Stage of Prooessng andAgency' Lender I Project Consulting Services Action on Procusement 4

(Cont'd)

m4inistry of Energy 17.0 (R) Petroleum Technical Assistance - Consulting services will Negotiations tentativelyend Fuel Resources (Bank) Project will include technical be required. scheduled for Januxry 24,

assist-nce to the oil nd gas sectors. 1994.Project will consist of energy sectortechnical assistance and institutionalstrengthening. Environmental AssessmentCategory B

To be determined 20.0 (R) Enterprisa Restructuring - Financial Substantial Consulting Project preparation under(IDA) and technical assistance will be services for enterprise way.

provided to: (a) privatise enterprises restructurSng andfor post privatization rextructuring: project implementation(b) participating banks for capacity will be requlred.building; ad (c) assist with projectimpleentation. EnvlronmentalAfSessment C&teSorY C.

Kyrgya State 20.0 (R) Energy (formerly Power) - Efficitrnct Consulting servicss will Project preparation underEnergy Company (Bank)/ Lmprovement in the supply and end-use *, be required. way.

(IDA) power ed heat, retrofitting andreconstruction of heat and powerdistribution network, and promotion ofpetroleum exploration. EnvironmentalAshessment Categorv B.

To be determined 50.0 (R) Aral Sea Regional Program - To To be determined. Project preparation under(Bank) assist republics in adopting sustainabll way.

development strategy for water resourc4mmanagement and providing framework formacroeconomic and sectoral policies Zoasustainable development of land, vate.:and other resources through theprovision of investment financing,training, technical assistance, andinstitutional development activities.Envlronmental Asessment Cateorv: ToSB Determined

To be determine 55.0 Economic Reform Support - To support the To be determined lEPS scheduled for April(IDA) Government's structural reform program 1994.

and complement stabilization andadjustment efforts with provision ofbalance of payments support andtechnlcal asesstance. EnvironmentalAssessment Ctegory: To Be Determined.

Ministry of 15.0 (R) Telecommuunications - Project will To be determined. Project preparation underComnmications (Bank) provide support toa (a) rehabilitat, wVY.

and expand the basic telecommunicationsnetworks (b) establish a market-orientedpolicy, regulatory and institutionalfr-mework to facilitate private andpublic investment and improve sectorefficiency. snd (c) commerclalize andcorporatise basic telecouw=iicattonsoperations. nvironmental AssessmentCategOrY .

- 76 -

Member Country, Amount LImplemsnting Probable Stage of Processing andAgency Lander Project ' Consulting Services Action on Procurement 4

REPUBLIC(Cont'd)

To b- determLced 35.0 Agriculture Reform Implementation To be determined. IEPS scheduled for(Dank)I Support - The main objectives of the January 10, 1994.(IDA) proposod project are tot (a) accolerate

the implementation of ongoin*strengthening institutional capacity Intha public sectors (b) develop andprovide a package of support services tothe *merging private farmers andenterprisesi and (c) stimulate privatesoctor development (PSD) in farming andkey agri-business activities.tnvironmental Assessment Catetorvt ToBe2Dtrmined.

To be determined 60.0 (R) Private Enterprise Sector Adjustment consulting uirvicis vill Project preparation under(IDA) (PECAC) - Credit vill support be required. Way.

privatization. enterprise reform,private sector development, trade policyreforms, and a social safety net.Environmental Assessment Carteory C.

Ministry of Labor 20.0 (R) human Resources Development - The Consulting services will Appraisal missionand Social (IDA) project would support a program to be required. Specific scheduled for Jsnuary 8SProtection create a social safety net through: requirements not yet 1994.

(a) building capacity for poverty and determined.unemployment monitoringl(b) strengthening the employmentservices: (c) improving theeffectivenses of training; and(d) creating a targeted socialassistance program. EnvironmentalAssessment C_tesorv C.

To be determined 5.0 (R) Environment - Treatment of Need for consultants not Project preparation ud er(Bank) vastewater in Liepaja for clean-up of yet determined way.

local beaches to increase tourism.Environmental Assessment Cateaorv B.

Bank of Latvia/ 30.0 (R) EnterpriselFinance - Project would Consulting services will Appraisal missionMinistry of (Bank) support enterprise and financial sector be required for project tentatively scheduled forFinance restructuring and privatization. It preparation and end February 1994.

would also enhance support for the implementation. Thedevelopment of the private sector, latter prLmarily throughEnvironmental Assessment CatetoXv S. technical assistance.

Ministry of 25.0 (R) Agriculture Sector - The project Consulting servLces will Negotiations in progress.Agriculture (Bank) would support the development of private be required for Board presentatton

farms and privatizstion of agro and technical assistance tentatively scheduled forforest industries, through financing during project early January 1994.viable investments and an institutional implementation.development progrem which are consistentvith the broad policy reform agenda inthe agricultural sector. Particularephasis will be placed on developmentof export-oriented activities,especially to the West. EnvironmentalAssessment Catesorv 8.

- 77 -

Xember Country, Amount &Implementing Probable Stagt of Proc&sring and

Agency Lrnder ' Project ' Coraulting Services Action on Procurmetr '

(Cont d)

Ministry of 50.0 (R) Energy Rehabilitation - Project is Consulting services will Project preparation under

Industry and (Bank) likely to include: (a) rehabilitation be required for project vay.Energy And modernization of hydropower plants pseparation and

and power transmission system: technical assista=ce(b) rehabilitation of Riga dixtrict component of project.heating network, through pipingreplacement and repair and installationof flow control facilities. (c) a pilotprogram for conversion of small heatingboilers to domestic fuelsa(4) installation of transmission andindustrial end-usa meters for gast andconversion of piped LPG systems to pipednatural gas. Project wlll aim toimprove efficiency and reliability ofenergy production and distribution, andvill also promote policy andinstitutional reforms in the energysector. Envirornmental AssessmentCatemory A/B.

Ministry of 30.0 (R) Social Protection - Project will Need for consultants not Project preparation under

Welfare (Bank) focus on health services, social yet determined, way.insurance reform as well asstrengthening social assistance andemployment policies. In the healthsector, emphasis will be on primaryhealth care, maternal and child healthcare, and hospital care (rehabilitationof facilities, organizational changes,retraining). Environmental AssessmentCategory C.

National Social 35.0 (N) Social Security - Project vill focus Consulting services may Identification under way.Insuranca (Bank) on supporting the new social insurance be required.InstLtution lwv by technical assistance to the(BODRA) social insurance institution (SODRA).

Social assistance component possible.Environmental Assessment Category: ToBe Determined.

lEnirommntal 6.5 (S) Envtronment - Wastevater treatment Xeed for consultants not Preparation under way.ProtectLon (bank) in Ilaipeda with a view to Improving yet determined.Directorate local beaches to improve tourism.General Environmental Assessment Catesorv B.

MinLstry of 25.0 (P) Agriculture - Project would support Read for consultants not Project preparation under

Agrlculture (lank) reform and restructuring of the yet determined, way.agriculture and forestry soctors through

policy reforms nd investments.Envtronmental Assessment Caterorr: ToB Determined.

- 78 -

Member Coamtry, AmoUZt &I3plerenting Probable Stage of Processing andAgency y Lender Project Consulting Services Action on Procurement 4

(Cont'd)

Lithuania State 50.0 (R) Power Rehabilitation - The project Consulting services will Appraisal missiton isPower System (Bank) is ILkely to includet (a) rehabilitation be required. scheduled for mid-January(LSPS) of old units at exLsting thermal power 1994.

plants; (b) instrumentation andcomunlcations and control equipment forthe dispatch center, substations and theKruonis pumped storagel (c) districtheating energy-saving investments$(d) hsaay fuel oil storage tanksl(e) conversion of small boilers tovoodehips and peat; and (f) technicalassistance. The project will reducefuel costs, improve enersy efficiency,increase system rcltability, facilitate

*nergy exchanges, and strengthen energylnstitutions. Environmental AssessmentCatexorv A.

To be determined 60.0 Enterprise/linance - Project would Consulting services will Pre-appraisl mLssion(Bank) support enterprise and financial sector be required for project schbduled for January

reform, acceleration of the preparation and 1994.privatiration of state entsrprisas, implementation, thestrengthening of the financial sector's latter primarily throughability to support the development of technical asxistnce.the privatized and new private firms.EnviTronmental Assessment Catesorw B.

To be determined 40.0 (R) Enterprise Financial Reform - Wead for consultants not Project preparation under(Bank) Project would support financLal and yet determined, way.

enterprise sector restructuring andwould provide long term credit resourcesto eligible enterprises. EnvironmentalAssessment Category: To Be Determined.

Ministry of 30.0 (R) Energy and Environment (formerly Need for consultants not Appraisal missionForeign Economic (Bank) Energy Rehabilitation) - The project is yet detemined, scheduled for endRelations likely to include: (a) rehabilitation February 1994.

and upgrades to petroleum productdepotsa (b) installation of gas meteringon the borders; and (a) *nergylenvironmnt audits and delopment ofenvironmental magement capacity. Theproject will improve security of energysupply, reduce losses, and reduce theimpact of energy consumption on theenvironment. Envirormental sessmentCateuorv B.

Ministry of 30.0 Agriculture - Project vould support Consulting servLes will Identification missionAgrlculture (Bank) newly emergins private famers and be required for sector seheduled for mid-April

privatiation of agro-industries through review snd project 1994.financing viable investments and preparation.technical assistance support.Eavironmental Assessmart Category: ToBe Determined.

To be determined 60.0 (0) Rehabilitation - Project will Consulting services may Approved by the Eecutive(Bank) finance essential imports to maintain be required. Directors on October 21.

production on key sectors during early 1993. Credit was signedperiod of economic reform. on October 22. 1993.Envirzomental Assessment Catesorv C.

- 79 -

Meeber Country, Amount &Impl-menting Probable Stage of Processtng andAgency Lander I Project I Consulting Services Action on Procurement

Prsedsxebiorstvw 45.0 K&towice District Beating - Project will Consulting services vill Negotiations completedEnargetyki (IBRD) include: (a) investments to optimize be required. June 4, 1993. AvsitingCiepin j (PEC) the existing district heating method of Government approval of

KatowLe-, to enhance energy conservation the legal documents.and efficlancy, reduce pollutiont (b) alocal boiler elimluationlconversionprogram; and (c) technical assistance.Environmcntal Assessment Categorv C.

Polish Paver Grid 150.0 (R) Power Privatization - Creation of a Need for consultants not Project idontiftcatiqnCompany (Bank) Private Sector Investment Fund to help yet determined, completed. Fuither

firnnce rehabilitation and *nvironmental processing on hold untilretrofitting investments in the Polish the Cogenerationpower sector under off-budget lLmited Privatisation Project hasrecourse financing arrangements wlth gone to the Board.private investors. EnvironmentalAssessment Category B.

Municipal 70.0 First MunLicpal Water Supply and Need for consultants not Identification of fundingUtilities (Bank) Sewerage - Institutional strengthening yet determined, for feasibility studies-

and investments for the rehabilitationand expanason of water supply and wastewater systems for the municipal waterand waste water utilities in the citiesof Bielsko Biala, Wroclav and Xrakow.Environmental Assessment Category .I

Ministry of 127.0 (t) Education Restructuring - The Expressions of intereat Appraisal report underEducation (Bank) project vould focus on restructuring the are solicited from preparation. Awaiting

education system at the secondary consultants in the decsion from Covernmenteducation level. It would support: fields of secondary to negotiate the project.(a) new programs, curricula, assessment technical education,and examLnation, and books in secondary post secondarreducation, as well as the refurbishlng vocational training,of approximately 100 model technical toacher training andsecondary schools; (b) pre-serviec and education administrationIn-service training for teachers; end manag-ment.(c) creation of thre- pilot highertechnological institutes; andCd) strengthening of management andLnformation systems. EnvironmentalAssessment Category C.

Polish Power Grid 200.0 tR) Power Transmission - The project Need for consultants not Appraisal report under(PPC) (Bank) Will consist of investments in yet determined, preparation.

transmission and dispatching systemsincluding eonstruction andrehabilitation necessary for UCPTEinterconnection. EnvironmentalAssessment Category B.

Polish 200.0 (R) Telecoms II - The project would Need for consultants not Project preparation underTelecomugnications (Bank) tentatively consist of a timaslice of yet determined, vay.Company (TPSA) the development program of the Polish (Coftinncing with EIB

Telecommunieationa Company. The focus planned.)would be on modernization and expansionof the Telecoms systems andinstitutional improvement.Envilrormental Assessment Categorv C.

ElektroceSplownia 150.0 (R) Cogeneration - Privatization of Consultants required as Negotiations tentativelyKrakow (ECKSA) (Bank) combined heat and power plant. a part of turnkey scheduled -for March 1994.

Environmental Assessment Category-S. contract.

- 80 -

MmbAr Country, mount IMeplementing Probable stage of Processing ndAgecy Lender 2 Project ' Consulting Services Aetilon on Procurement 4

(Cont d)

To be determined 150.0 Coal Sector Adjustment Operation - Nead for consultants not Project under(Bank) Project v1ii provides (a) financial yet determined, preparation.

assistan C for closurelmrger of minesl(b) technical asaistanee inenvironmental and social issues and(a) asslstance in regulatory, legal, andinstitutLonal matters. EnvironmentalAssessment Cateaorv B.

Xluistry of 100.0 OlI and Gas Developmnt - The proposed Consulting aervices will IEPS to be developed.Industry end (Bank) project would assist the Covernment in be required ln1AVINOM tbe restructuring of its refinery sector implementing a refinery

for the purpose of improving the sector restructuringefficiency of operation, optimLzation of study that would providethe Sector and promoting private sector the restructuringinvestment, including privatization of framework. Consultancysome of the refineriLx. nvLronmental serviezs vould also beAss-ssment Catetory: To Be Determined, required during project

implementation.

To be determined 125.0 Industrial Development II - To support Need for consultants not Preparation under way.(Bank) development of industrial exports yet determined.

Lncluding polLcy and incentivesframwork, building of export relatedinstLtutional framework, andrestructuring of the forelgn tradeseotor. Also credlt line to financeinvestments to improve internationalcompetitiveness and output of exportableproducts. nvironmental AssessmentCategory B.

To be determined 150.0 (R) Agricultural Privatisation Product, Consulting services will IdentLfication under way.(Bank) Market and Export Development (formerly be requlred

Agroindustry Product, Market and Export (100 staffueeks in foodDevelopment) - The major objective would processing technology,be to support broad-based privatization domestlc and exportend restructurinS of key economic groups marketing, food productln the rural sector. It would have development, enterprisethree subsidiary objectives: (a) to restructurLng, andstrengthn 0 GO capacity to support the privatisation.)agroindustrial privatization program andthe private sector in general; (b) tosupport the introductlon of high qualityproduction, packasing and marketingstandards; and Cc) to provtde foreignexchange needed for modernization of thesector. Environmental AssessmentCategorv B.

MinLstry of Labor 122.0 (R) Employment and Soclal Protection - Need for consultants has Appraisal report underand Social tBank) The proJect vould support development of been determined but not preparation.Protection *mplo'ent, training, and social yet selected.

assistance services to ease transitionto * mrk t economy. EnronmentalAsessmnas Catesorv C.

Membor Country, Amount IIrplementing Probable Stage of ProcosjW4 *ndAgency ' Lander I Project C Consulting Services Action on Pro-Wu-sont 4

(Cont'd)

ROMTELECOI 100.0 (R) TelecomunicationAs - The project NRed for consultants not Preparstion under way.(Bank) would provide fort (a) rehabilitation yet determined.

and expansion of exchangs, externalcables and long distance networks inurban and rural areast (b) spare partsand equipmento and (c) institutionaldevelopment. Environmental AssessmentCatesorv C.

Romania Crude Oil 175.0 (RI Petroleum Soector Rehabilitation - Consulting services will NegotiationsTransporting (Bank) The objectives of the project are to be required. substantially completed.Company, Romania provide assistance to the Government in (Cofinancing is beingNational Gas tho restructuring of sector entities requested.)Corporation, with a view to: (a) promoting privateMinistry of sector investments in the petroleumIndustries subsectors (b) enhancing the domestic

production of oil and gas. upgrading theefficiency and capability of the oil andgas transmission and distributionnetworks, te) addressing theenvironmental pollution of soil andgroundwater in oil and gas producingareoast and (d) assisting in establishingan offective producer pricing for oiland gas and a pricing policy for crudeoil and gas transmission anddistribution. Environmental AssessmentCategorv B.

To be determined 100 0 Local Government Development - The Need for consultants not Preparation under way.(Bank) proJect will include: (a) funding for yet detormined. (Cofinancing wiL be

construction of new andlor completion of expected from EBRD andexisting munLcipal infrastructure and EIB.)facilities; (b) technical assistanco tolocal governmentsa and (c) technicalassistance to central governmentinstitutions responsible forimplementation of local governmentreform. Environmental AssessmentCatoaorv D.

Ministry of About (R) Education - To support reform Consulting services will NegotiationsEducation 55.0 implementation inL (a) educational be required. substantially completed.

(Bank) amaessment/testingg (b) primary andsecondary curriculum and teachingquality; (e) educational materials; andtd) secondary technicallvocationaleducations end (e) education managementand financing. Environmental AssessmentCateMorv C.

RENEL 200.0 CR) Power Sector Rehabilitation and Consulting serviees for Appraisal mission(Bank) Modernization - The projeet would engineering work will be scheduled for January

provide assistance to RENEL (the power required at the 1994.utility) fort e) rehabilitation and implementation phase. (Cofinancing is beanglife extension of a number of existing Environmental impact sought by thethermal plantal (b) rehabilitation and ass*stment study Government.)modernization of pollution control completed in Novemberequipment in thermal power plants; 1993.(e) corporate restructuring of powersubsector, electricity pricing study andimplementation, demand-side management,including improvements in metering andtechnical assistance. EnvironmentalAssessment Category B

- 82 -

Member Country, Amount &Implementing Probable Stage of Processitn andAgency Lander t Project £ Consulting Serviees Action on Procurment 4

(Cont'd)

Ministry of 250.0 (R) Pinancial end Enterprise Sector Need for consultants not Appraisal mLsionEconomy and (Bnk) Adjustment - Thu project would introduce yet dete-rmned. scheduled for March 1994.FLnane, National systemtic reforms in the bankingBank of Romania, sector, strengthen public debtNational Agency management and monetary control, creatofor Privatization, an effective capital ownership function,State Ownership end ensure efficient design andFund implementation of enterprise

privatization and exit mechanism.Environmental Assessment Catetorv U.

MinLstry of 175.0 (R) Industrial Development - Redesigned Neod for consultants not Board presentationEconomy and (Bank) to become development financo operation, yet determined, scheduled for February 1,Finance, Ministry Including pre-shipment eaport finance 1994.of Resources and facility and permanent working capital (Cofinancing required.)Industry, National and Lnvestment finance. Policy elementsAgency for include support to privatisation,Privatization and private sector development, industrialSmall and Mid-Size sector restructuring strategy andEnterprises, enterpriso restructuring programs.participating Technical assistance for both pollcy andbanks financing parts. Envronmentol

Asssment CatReOrV B.

To be determined 100.0 (N) Economic Law Reform - Project vill Need for consultants not IEPS scheduled for(Bank) develop and implement an appropriate yet determined. March 1, 1994.

legal and Institutional framework insupport of economic reforms, includingthe carrying out of sp*eLfic sub-projects such as the establishment andoperation of a logal information systm,land and personal property securLtyregistry offices, and a nationalsecurities comuission. EnvironmentalAssessment Cateaosr C.

To be determLned 75.0 (N) Land Reform Implementation Support - Need for consultants not Negotiations tentatively(Bank) Projct will support implementation of yet determined, scheduled for March 14,

land reform and finance imports of 1994.appropriate equipment for establishing aland registration system. Envirnm nt-Assessment Catezor- C.

State Tax Servie 100C 0 (N) Fiscal Manag-emnt - Projct would Nled for consultants not MIPS scheduled for(Bank) support the modernization of tax yet determined. May 12. 1994.

administration, and includecomputerizing the administration of theVAT, and, at the same time, introducemodern tax administration proceduressuch as solective auditing of taxreturns, and filing of a combined taxreturn/paymnt order form.Environmental Assessment Cateaorv C.

- 83 -

Member Country. Amount &Implementing Probable Stage of Processing andAency Lander Project ' Consulting Services Action on Procurement

(Cont'd)

Ministry of Fuel 100 .0 (R) Power S-ctor - The project would Consulting services vill Project preparation undernd Pover (Bank) finance investments in conventional be required. vay.

power plant end transmission capacity.Would also facilitate the early shutdown of higher risk nuclear plants.Environmental Assessment Category: ToBe Determined.

Ministry of 500.0 (R) Agriculture SAL - To support To be determined. Project preparation underAgriculture (Bank) agricultural sector policy reform Way.

program and finenc- amports of criticalagricultural inputs andlor providebalance of payment support.Environmental Assessment Catesorv C.

Ministry of 500.0 (R) Social Safety Not Adjustment - An To be determined. Initiating MemorandumFinance (lank) adjustment loan in support of policy tentatively scheduled for

reform in the area of social protoction. January 14, 1994.Environmental Assessment Catetorv C.

Tomknaft, 500.0 (R) Oil Rehabilitation II - Project vill Consulting services vill Appraisal missionMegionneftegas, (Bank) focus on oil production rehabilitation be required for tentatively scheduled forand at three producing associations in technical, financial end January 24, 1994.Yuganskneftegas Western Siberia. Environmental procurement advisory

Assessment Catoxorv A. services, end forreservoir modelling.

To be determined 500.0 (R) Petroleum Joint Venture - Project To be determined. Projoct preparation under(lank) would fund part of a joint venture vay.

betvwen Russian and international oilcompany for major new cilfielddevelopment in Western Siberia.Environmental Assessment Cateeorv: ToBe Determine .

To be determined 200.0 (R) Enterprise Restructuring (formerly Consulting services will Appraisal mission(Bank) Enterprise Reform Adjustment) - be required. scheduled for February 9,

in anc-Il and technical assistance to 1994.privatised companies for post-privatisation restructuringEnvironmental Assessment Catetorv D.

To be determined 200.0 (R) Oblast Industry Finance - Promotes Consulting services will Project has been placed(Bank) private sector development in selected be requir-d. in the FY97 lendLng

oblasts. Environmental Assessment program. FurtherCategorv C. reporting will be

discontinued.

To be determined 300.0 (R) Enterprise Reform II - Project Consulting sorvices will Identification mission(Bank) continues entorprise restructuring begun be required, tentatively scheduled for

under the first enterprise reform June 1994.project. Envioronmntal AssessmentCateoorvt To Be Determined.

Linistry of 250.0 (R) Agriculture Reform Implemantation - Consulting serviceL have Appraisal report underAarLculture (Bank) To support implementation of been engaged for this preparation.

agricultural reform, finance imports of project.appropriate equipment; and financecritical investments in agriculture.Environmental Assessment Catesorv B.

- 84 -

Me5ber Country, Amont .lIplementing Probabl- Stage of Processing andAgency LanderI Project Consulting Services Action on Procurement

(Cent d)

NMinitry of 100.0 Agriculture Reform Implementation To be dotermined. Identification missionA4riculture (Bank) Support II - To support implementation scheduled for August 15,

of agriculture reforms and finance. 1994.Selected investments and imports toimprove the efficiency of theagricultural sector with particularemphasis on agriculture technologyseneration, transfer and utilization.Environmental Assessment Catesory To

De Determined.

Central Bank of 200.0 (R) Payments and Settlements - Support Consulting serviees will Project preparation underRussia (Bank) the modernization of the Payment System, be required, way.

Envtronmental Assessment Category: To A Japanese Grant requestBs Determined, is still pending.

RetroaEctve financint mabo rouirLd.

To be determined 300.0 (R) Urban Transport - Project seeks to: Consulting services have Project preparation under(Bank) (a) increase bus trolley and train been engaged for project way.

service capacities; (b) assist in preparation.developing selected public transportsystems on a financially sustainablebasis; and tc) indirectly spurdevelopment of a stronger domesticindustry for manufacturing publictransport vehicles. EnvironmentalAssessment Cateaory C.

ministry of 600.0 (R) Rehabilitation II - Project will Consulting servie-s will Negotiatlons completed.?inane and (Bank) provide foreign exchange to finaneo be required for Board presentationCentral Bank imports in support of Russias program iplementation. delayed until

of stabilization and structural reform. February 24, 1994,The project will include two components. pending completion of(a) a market-based component to finance agreed policy action.imports by the growing commercialprivate sector; and (b) a pra-identified Procurement: Localimports component. Environmental procurement agentAssessment Catesor, C. service. approximately

US$1.5 million.

MLiletries of 300.0 Trade Reform - Project will provide To be determined. Project preparation underFinance and (Bank) foreign exchange to finance imports in way.Foreign Ecenomic support of price and trade refor. WillRelations also help improve institutions concerned

with exports of non-traditional goods.A credit line will be provided to builda market for trade finance.Environmental Asseasment Category: ToBe Determined.

Ministry of 400.0 (R) Housing - The objectives of the Consulting servlces will Project preparation under4fnance/Ministry (Bank) project are to encourage the development be required for vay.

of Economyl of a private housing market, to increase impl-centation andOOSSTROY the stock end reduce the cost of preparation.

housing, and to promote efficiency andpreserve employment in the housingconstruction industry. EntironmentalAssssment Cateeory, To Be Determined.

- 85 -

Member Country. Amount &Implementing Probable Stage of Processing andAgency a Lander X Project Consulting Services Action an Procurement

(Cont d)

Ministry of 200 0 (R) Financial Institutional Development Consulting services will Appraisal missiozn is inFlnance, (Beak) - Project will provide for technical be required. the field.Central Bank of assistance and equipment for Japanese Grant has boenRussia institutional development of commarcial approved.

banks, as vell as bank accounting andbank supervision. Environmental 16=22CUMS ftnainEZuAssessment Category C. vill be recuired.

Ministry of 100.0 (R) Enviromnant Technical Assistance - To be determind. Appraisal misSionEnvironment and (Bank) Project vlll strengthen institutional tentatively schbduled forNatural Resources and regulatory systems for environmental January ,23 1194.of the Russian management at the nLational end regionalFederation levels, and set up a national pollution

abatement fund. EnvlronmentalAssessment Category B.

Ministry of 300 .0 (R) Environmental Investment - Recovery Consultants have been Proj-et underEnvironment end (Bank) end processing of otherwise flared engaged for the preparation.Natural Resources associated gas in Pur Region Western feasibility study.and Ministry of SiberLa and export of gas products toFuels and Energy Europe aalso setting up of an agency toof the Russian enforce the oil and gas conservation lawFederation on a pilot basis in Western Siberia.

Environmental Assessment C1tesorY A.

Ministry of Labor 100.0 (R) Managemnt and Financial Training - To be dtemined. Appraisal mission(Bank) The project would develop critLcal scheduld for January 24,

management and financial skills needed 1994.in key sectors for the transition to amazrket economy. EvtronmentalAssessment Categorv C.

Agsncy for 40.0 (R) Portfolio Development - Project Consulting servcoes wlll Project bas been placedInternational (Bank) seeks to: (a) develop a pipeline of be required. in the TY97 lendingCooperation and projects suitable for Bank financings program. FurtherDevelopment (b) strengthen institutional capacity to reporting vill bemobilize end coordinate the flow of discontined.external aesistance- and (a) strengthenthe capacities of agencies involved Inproject Implementation. InviromentalAssessment Category C.

The State 100.0 Soclal Protection and aeployment - The Consulting services vill ZEPS scheduled forCommittee on (Bank) project would finance further be required. April 11, 1994.EMploymnt, computerization end other assistance forMinistry of Social this extension of social securityProttetion systems. EDnironmental Assessment

Catezory C.

Ministry of Health 200.0 (R) Health - The project would develop Consulting cerviess vlll Projeot preparation under(Bank) and support the implowmntation of health be required. way.

"ector reform include health insuraneotraining, maternal and child health(MCO), preventative health program.Environmental Assessment Catesorv C.

- 86 -

Member Country, Amount Implmnting Probable Stage of ProcesIung and

A4 c7 Lenr Project Consultlig Services Action an procurest 4

(Cont'd)

Russia Energy 210.0 (R) :as Distribution - Project would Consulting services will Appraisal missionSavings Fund, (Bank) inerease gas available for export and be required for related scheduled for January 24,ROSSGAZIPIKAZZA, domestic use by decreasing losses and technical assistance. 1994. Loan aountand 4 Gas eonsumption. Purchase of meters for decreased because number

DistributLon unmtered consumers would be included of cities to be included

Companies along with cathodic production in the project has been

(Volgograd, equipment, leak detection oquipamet, and reduced.

Ryazan, Saratov, replacement of existing piping andand Voronezh) equipment to reduce gas consumption by

customers. Environmental AssessmentCateaorv B.

Ministry of 300 0 (R) Regional Agricultural Area Consulting services have Project preparation underAgriculture (MOA), (Bank) Development (formerly Regional been engaged for project way.

ROSKLEB product, Agriculture Area Development) - Project preparation.ROSKONTRACT will address prevailing constraints to

productivity and efficiency on food andagriculture asector and accelerate itsongoing restructuring, prLvatization andmarket orientation. Project wouldaddress: (a) policy issues(b) financing of a broad-based programof investments including a line ofcredit to qualified private andprivatized companies, and (c) technicalservices. Enviror4nental AssessmentCateaorv B.

The State 70.0 Employment Services and Social Long and short-term Approved by the ExcutiveCommittee on (Bank) Protection - The project would build consultants to assist in Directors mn govember 24,Bmployment, labor market policy and management design of employment 1992.Ministry of Social capacity, establish labor market service s*rvices.Protection delivery, staff and worker training.

Environmental Assessment Cateaorv C.

Ministry of 300.0 (R) Highway Rshabllitatlon and Consulting sorvices wlll Board presentationTransport, Federal (Bank) Maintenance - Execution of a three-year be required for studies, scheduled forHighway Department program of urgently needed road design, preparation of February 17, 1994.

rehabilitation and maintenance, bidding documents, andtehnical eooperation for oolicy advice works supervision.and training on highway Issues. Expression of interestEnvLronmental Assessment Category B. are solicLted from

consultants in thesefields.

REPUBLIC

Ministry of 100.0 (R) Zeonomle Recovery (Structural Consulting services will Approved by the ExecutiveFinance (Bank) Adjustment) - To focus on key reform not be requlred. Directors on November 30,

issues including fiscal policy reforms, 1993.enterprise and financial sectorrestructuring, *and better targeting ofthe social safety net. EnvironmentalAssessment Cateaorv: To Be Detormined.

- 87 -

Member Country, Amount &Implementing Probable Stage of Processing ndAgency ' Lender ' Project ' Consulting Services Action on Procurement 4

(Cont'd)

Slovak Pover About (R) Power Transmission - Project will Consulting services vill Project preparation isEnterprise 120.0 provide fort (a) transmission system be requirod. under way.

(Bank) and substation upgradingl Solicitations not(b) improvements in the requested.telecommunications system; and(c) training and technical assistanca.Environmental Assessment Category B.

Ministry of 50.0 (R) Investment Recovery - A direct Need for consultants not Appraisal mission is inFinsnc- (Sank) complement to the EFSAL. Would help yet determined, the field.

finance a new cycle of privatelnvestments anticipated as a result ofSlovenia's implementation of *nterprisereform. Environmental AssessmentCatteRorV B.

Ministry of 50.0 Environment - The project will foous on Seed for consultants not Project preparation underEnvironment (Bank) air pollution and institutional yet determined. way.

strengthening. The project will havetwo components: (a) expansion ofexisting andlor building of new districtheating networks on gas basis; and(b) institutional streangthening.Environmental Assessment Cateeory B.

TAJ

To be determined 20.0 (R) Reconstruction - Reconatruction end Consulting services will Project preparation under(IDA) repair of key infrastructure, public be required to assist in way.

services, including education and project preparation andhealth, productive capacity and housing implementation.stock destroyed or damaged during theperiod of civil strife and the 1993floods. Environmental AssessmentCategorv B.

National Institute 100.0 Technology Development II - The project Consulting services vwll Preparation in prosressof Metrology, (Bank) will support: (a) the second phase of be required. by implementing agencies.Turkish Scientific development of the National Metrologyand Technical Institute; (b) the *stablishment of aResearch Turkish Patent Institutes tc) theInstitute, *stablishment of software quality andMinistry of testing laboratory; and (d) technicalIndustry and Trade assistance for strengthening geographic

information and satellite remote sensingcapabilities. Environmental AssessmentCateaorv: To Be Determined.

Treasury and 100 0 (R) Privatization Implementation Nead for consultants not Appraisal mission is inForeign Trade (Bank) Assistance - The project will assist yet determined, the field.Undersecretariat, selected agencies to implementPublic privatization. Environmental Assessment Ret"erOtive financingParticipation Categorv C. rovision of up to lOX ofAdministration erolect amount is

exp4cted.

- 88 -

N-mber Country, Amount oImplementing Probable Stage of Proc J$t$ *nd

Agency Lender 2 Project ' ConsultLng Services Action on Procur,Meat 4

(Cont'd)

State Institute of 40.0 (R) Informaties - The project will Consulting servLces will Appraisal mLssionStatiatics (SIS), (Bsnk) provide for; (a) establishing a be required. s*ebduled for A".Directorate of national information network for SISI February 1994.Radio (b) installing a modern radio frequencyCoamunications spectrum management system for TGMI and(TGt), Post, (c) talecommunications sector reformTelegraph and leading to privatizstion.Telecommunications Environmental Assessment Categorv C.(PTT)

To be determined 100 0 (R) Istanbul Gas Distribution - The Need for consultants not Preparation unde- way.(Bank) proj et would provide financing for yet detormined.

users connection to natural gasdistribution in network and conversionof equipment, as well as institutionbuilding. Environm ntal AssessmentCategorv S.

ISKI 250.0 Istanbul Water Supply and Sewerage III - Consultant for Preparation under way.(3ank) Water supply, sewerage and drainage feasibility study (CofinancLng may be

system. Environmental Assessment (Onerli Catcbment Basin) requLred.)Category B. vaa selected.

Consultants for theMaster Plan for watersupply end sewerage vcrealso selected.

Ministry of Health 160.0 (R) Health II - Project will strengthen Consultants have been Appraisal mission(Dank) public health services in Eastern selected. tentatively scheduled for

AnatolLa, and assist in the introduction January 1994.of a health reform in a pilot region.Environmental Assessment Category C.

Antalya About Antalya Water and Sanitation - Project Consultant for Pre-appraisal mdssionMunicipality 100.0 would include water supply, sewerage. feasibility study was plenned for February

(Bank) and solid waste components and assist selected. Study under 1994.the Antalys Municipality in establishing preparation.an appropriate institutional frameworkfor the management of the services.Environmental Assessment Catezory B.

XLnistry of About Basic Education - Project would support Heed for consultants not Pre-appraisel missionNational Education 100.0 the expansion of basic schooling (Grades yet determined, scheduled for February

(Bank) through 8) to improve system cowvrage 1994.and relieve overcrowded schools, vLthparticular effort to raise the schoolattendance of girls. EnvironmentalAssessment Categorv C.

Turkish About (R) Coal Pollution Abatement - This Consulting services will Project has been rmovedElectricity 120.0 project, to be developed by the Turkish be required for project from the lnding program.Authority (TEX) (Bank) Electricity Authority (TEK) is to reduce implementation. Further reporting will be

sulphur and NOX pollution from TEK's dlscontinued.lignite thermal plants. EnvironmentalAssessment Cate2orz B.

Ministry of BHelth About Social Insurance Reform - Creation of a Need for consultants not Preparation postpoend100.0 National Hygiene Institute and support yet determined, pending Covwernmnt(Bank) for development of a regional network to decisions on tcChnical

public health laboratories end political option.Environmental Assessment Cateaorv C.

- 89 -

Member Country, Aoount t

Implementing Probable Stage of Processing endAgency I Lender 2 Project ' Consulting Services Action on Procurement

To be determined 35.0 (R) Oil Sector - P--oject would focus on Need for consultants not Project preparation under(Bank) investments and te.,hnical assistance in yet determined. way.

support of restructuring and Lmprovedfinancial management in the country'smajor refinery at Krasaavoth.Environmental Assessment Caterorv: ToSe Det-rmined.

To be determined 22.0 (R) Technical Assistance - The loan will Consulting services vill Pre-appraisal mission(Bank) provide support in the folloving areas be required. completed. Appraisal

(a) privatization and private sector mission scheduled fordevelopment; (b) enterprise mid-February 1994.restructuring; (c) bankLng reform andfinancial sector; Cd) legal frameworkfor private sector development,(s) regional transport pricing;(f) development of European exportmarkets; (g) pro-investment studies fornew gas export pipeline; and(h) procurement capacity and contractmanagement; and (i) project evaluationcapacity. Environmental AssessmentCategory C.

To be determined 40.0 (R) CottonlIrrigation - Project will Need for consultants not Identification under way.(Bank) identify and introduce reforms and yet determind.

investments for developing agriculturebased on best technical, financial,*conomic and environmentaL practices.Environmental Catesory: To BeDetermined.

To be determined 60.0 (N) Private Farm Development - Project Need for consultants not Identification under way.(Bank) will provide technical and financial yet determined.

assistance for farm restructuring andproduction development. EnvironmentalAssessment Category: To Be Determined.

To be determined 100.0 (R) Social Protaction - Project seeks Consulting services will Initial lEPS scheduled(Bank) to. (a) reform the social security be required. for early 1994.

systems and (b) strengthen employmentservices and training. EnvironmentalAssessment Category: To Be Determined.

To be determined 400.0 Rehabilitation - Project would finance Consulting services will Pre-appraisal mission(Bank) essential imports in support of economic be required. tentatively scheduled for

reform program. Environmental may 1994.Assessment Categorv C.

- 90 -

Momber Country, Amount &Implementing Probable Stage of Processing andA4ency Lender' Project Consulting Services Action on Procure3ent 4

(Cont'd)

To be determined 150.0 tR) Energy Sector - Posaible coapeOnts To be determined. Project preparation under(Bank) lnclude: (a) rehablILtation of theral way.

power plants; (b) district heating,(c) gas distributions (d) cocal bedmathune recovery and te) energyefficiency Lmprovemeats. EnvironmentalAssessment Ceteaorv 3.

To be determined 50.0 Seed ProductLon - The project vould To be determined. Appraisal mLisson(Bank) support moderniLation and privatlzation scheduled for mid-January

of seed productlon, processing and 1994.martketing. Envlronmentil AssessmentCateaori 3.

To be determined 60.0 (R) FPnancial InstLtutLons Development Consulting services wlll Project preparation under(Dank) (formerly EnterprLellFnuance Reforn) - be requlred. way.

The project vould support development ofthe banking sector and vould providefinancing for export oriented projects.Envlronmental Asaessment Cateor B.

UKRGAZPROK 150.0 (R) Natural Gas Transit - Project vill To be determined. Work on detailed(Cank) rehabilitate and expand the natural gas feasibility study Ln

transmission system ln order to increase progress.ths quality and relLabLlity of gasexport to Europe. EnvIronmen_taAssessment Catezorv B.

To bo determlned 50.0 (R) health - Project would support the Consultlng servlces will Pro-appraisal mlssion(Dank) restructuring of the health sector be required. scheduled for January

Including imaunisation servLces, mother 1994.and child health, famlly planning,health admLnistratlon and public healthtraining, capacity building for healthfinancing, and pharmaceuticalregulation. Environmental AssessmentCateaorv C.

Ministry of 30.0 (R) Telecom=mications - ModernisIng Consulting servlces will Project preparation underCommunications (Bank) national talecom system to undarpin be required. way.

reform process. EnvironmentalAssessmnt Cate*ory C.

To be determined 180.0 (R) Rehabilitation - Project will To be determined. preparation under way.(Bank) support implementation of the Economic

Reform Program. EnvrronmentalAssessment Category: To Be Determined.

- 91 -

)4mber Country, Amount &Implementint Probable Stage of Processins andAgency I Lender Project Consulting Servlces Action on Procurement

(Cont d)

ministry of 50.0 (R) Cotton Improvement - Program To be detersmined. Pro-appraisal missionAgriculture (Bank) objectives are to: (a) improve completed. Appraisal

international marketins of cottons mission scheduled for(b) improve seed quality and its March 1994.distribution system; (c) enhanceintegrated pest management programi and(d) improve on-farm irrigationscheduling. Environmental AssessmentCateaorv A.

To be determined 50.0 (R) Eu en Resources D-velopment - To be determined. Project preparation under(3ten) Proj-et vould support creation of a Way.

social safety net. reform of the socialsecurity system end development ofsocial assistance and health services.Environmental Assessment Categcry C.

To be determined 100.0 Private Enterprise Restructuring Finance To be determined. Identification mission(bank) - Financial intermediary loan to: sehedule is contingent

(a) finance investments (b) improve upon progress made inpolicy and regulatory framework for policy framework dialogue(i) increased supply resaonse of private with Government.enterpries end export promotion, and(ii) improved capacity of the financialsector to provide torm lending, forexport activities and restructuring ofviable enterprises, and (c) providetechnical assistance for policy reforzsand capacity building in industry andfinance. Environmental AssessmentCatesory: TSoB Determined.

To be determined 100.0 Oil and Gas - Project vLll compriso To be determined. IEPS scheduled for April(Bank) rehabilitation and development of 1994.

priority areas in petroleum sector.Environmental Assessment Category: ToBt Determined.

- 92 -

MKebr Cmantry, A-ouMt D pl _dting Probable Stage of Proessing andAgY a' Lead.r I Proj-et ' Consulting Servies Action an Procureas. 4

rv. LATfW AIRRC& AND CARIrBRAN RECTOC

Ministry of 200.0 (N) Decentralization of Secondary Consultant services in Project preparation toCulture end (Bank) Education II - The project is aimed at the areas of assessment start in April 1994.Education supporting the decentralization of of students, amnagement

secondary education by facilitating the information system,transfer of schools to the provinces, teacher training, andstrengthening national and central level curriculum planning villcapacity to manage a decentralized be required for theschool system, and delivering efficient preparation andand effective secondary education. Implementation.Environmental Assessment Category C.

Ministry of 10.0 (R) Reduction of Ozone - Follows To be determined. Appraisal missionEconomy (Bank) procedures under the Ozone Trust Funds tentatively sechduled for

which includes preparation of a country May 1994.program for phasaout of ozone depletingsubstances and an investment proposalfor the trust fund. EnvironmentalAssessment Cateaorv B.

To be determined 100.0 Flood Protection - Implemntatton of a To be determined. Preliminary studies under(Bank) flood protection program in several way. Preparation mission

provinces adjacent to the Parana and to take place in MarchParaguay Rivers. Environmental 1994.Assessment Catetory: To Be Determined.

Ministry of 100.0 (R) Higher Education Reform (formerly Consulting servLces will Project preparation underEducation (Bank) Higher Education and Technical Skills be requlred, way.

Development) - The project would:(a) strengthen hither educationplanning, management and resourceallocation, and (b) raise quality andefficiency in higher educationinstitutions. Environmental AssessmentCategorv: To Be Determined.

Secretary of 50.0 (R) Poverty Alleviation - Project vould Consulting servie s vill Preparation mission toAgriculture, (Bank) provide strengthening of small farmer's be required for take place in OctoberLivestock nd organizations and finance participatory preparation. 1994.Fisheries (SAGyP) coasfunity development initiatives.and Federal Environmental Assessment Catezorv: ToInvestment Council Be Determined.(CFI)

Mlnistry of 10.0 (R) Capital Markets Techlical Assistance Reed for merchant bank Negotiations in progress.Fconomy (Bank) - Project will provide technical to help manage backstop

assistance for the development of facility. Retroactive financing ofcapital markets. It would also assist up to US8700S000 isvlth the implementation of the Capital lMarkets Development Project.Enviromental Assessment Category C.

- 93 -

Member Country. A,mnt Imlenting Probable Stage of Processing naAgency Lader 2 Project' Cousulting Services Action cn Prcem eDmet4

(Cont'd)

Ministry of 12.0 (R) Defense Reform Technical Assistance Consultant services will Project proparation underDefense (Bank) - This project would, (a) reduce the be required in the areas bay.

size of military service facilities of privatization,through the privatization of airports maiagementand related enterprisess (b) restructure reorganization, andthe Direccion Ceneral de Fabricaciones airport regulatoryMilitares (DCPM) in response to new frameworks.downsized military, and (o) establish aregulatory framework for the NationalAirport System (NAS). EnvironmentalAssessment Categor-v C.

To be determined 200.0 (R) Provincial Roads - Project vould: Consulting services vill Reconnaissance mission In(Bank) (a) improve road activities in specific be required. Scope of the field.

provinces; (b) strengthen their servLces is to becoordination with Central Government; determined.(c) improve provincial road funding# and(d) follow-up current technicalassistance to provinces in the RoadMaintenance and Rehabilitation Project(Loan 3611-AR). EnvironmentalAssessment Category: To Be Determined.

Secretariat of the 20.0 (R) Social Reform Technical Assistance - Consulting services will Project has been droppedPresidency (Bank) The project would support technical be required, from lending program.

assistance and specific studies to Further reporting will beprovide the analytical base, support for discontiued.implementatLon and monitoring evaluationfor the development of priority socialsector policy reforms. EnvironmentalAssessment Category C.

Secretaria de 25.0 Forestry Management - Improved To be determined. Project preparation toA4ricultura, (Bank) managament of natural and plantation continue onceGanaderia y Peaca forests, forest inventory and associated Japanese Crant Fund has(SAGYP) forestry sector policy formulation, beon signed.

Environmental Asgessment Category: ToBe Determined.

Ministry of 15.0 (R) Regulatory Development Technical To be determined. Project preparation underEconomy and Public (Bank) Assistance - Strengthening the way.Works and Services reinforcement capabilities of regulatory

agenctes. Also, update regulations inresponse to market structure.Environmental Assessment Category C.

Secretaria de 125.0 Provincial Agriculture Development I - To be determined. Project preparation underAgricultura, (Bank) Support investment for soil and water way.Ganaderia y Peaca conservation and other natural resource Japanese Grant has been(SAGYP) management measures. Environmental approved (not yet signed)

Assessment Catesorv B. to support the localpreparation group.

-94

maebr Country, Amonemt aIlWPItla. 1rsbable Staeg of Pra.essfln aAigmoy lemer' Prect' Consulting Services *utiob an Poenurinv t'

(Cont'd)

Ministry of 200.0 (R) Decentralized Secondary Education - Consulting services vlfl Appraisal missionCulture and (Beak) Project would support decentralization be required and financed tentatively scheduled forEducation of secondary education to the provinces, under a Japansse Grant. late February 1994.

It would include institutional A Japanese Orant has beenstrengthening of a streamlined federal si*gnd by the Government.ministry and of the provinces, andinvestments for improving quality ofsecondary education end for replacing,rehabilitating and renovating secondaryschools in selected provinces.Envlronmental A-sxssment Category C.

To be determined 300.0 (R) Provincial Adjustment - Project To be determined. Preparation mission in(lank) Includes: (a) modernizing framework of the field.

federal/provincial fiscal relations, andassistance to asveral provincesfor privatisation of provincialenterprises (b) downsizing of publicsector entitiess (e) strengthentng oftax administration and budgetmanagement, and (d) provincial bankreform. nvSironsntal AssessmentCatecorv C.

Banco de 500.0 (R) Capital Market Development - The Consulting aervices Negotiations in progress.Inversiones y (lank) loan vlll finane a fund that would help likely to assist NICE inComsrcio Exterior participatin caeo reiaL banks Issue pricing the 'backstop(tICZ) bonds to finance private investment facility'.

projects. The fund, a backstopfaeility, would stand ready to buy bondsissued to rollover prior bonds in caseof market liquidity disruption and buybonds matching the outer maturities ofinwestment loans. EnvironmentalAssessment Cateaorv C.

inisteriao de 200.0 (R) Health Sector Development (formerly Consulting services will Preparation under way.Salud y ieonestar (lank) Creator Buenos Aires Health Development) be required. A PPT advance is beingSocial - The project woulds (a) support health requested by the

sector reform initisatives, particularly Govern=ent to completeIn the areas of reform of the health preparation.insurance system and of the*stablishmsnt of hospitals as'autonomous' institutionsa(b) strengthen public sector hospitalmasngement in Metropolitan Juenos Aires

"nd in the Province of Mendosa; and(e) upgrade the infrastructure ofselected hospitals in MetropolitanBuenos Aires and in the Province of-Mbdosa through the creation of ademand-drlvan Investment Fund.Environmental Assessment Catezorv- ToBe Determined.

-~ ~ ~ ~ ~ ~ ~ ~~~-9 Nk-ber Country, mount Zmptl_ing Probablo stage of Wgoassin and4gecy Lander a Project 3 Con.ultng Services *At.oa an PzrcVUznt 4

BZLI

Bellz- Electricity 14.0 (R) Power Davelopment - This projaet To be determined. Appraisal missionBoard (BEB) (Bank) would assist in the financing of: schedul*d for

(a) the construction of a 115 kv January/Webruary 1994.transmission grid running from theborder with Mexico to BeliLs City endBelmopan; end (b) consulting services toassist the Government in (i) thopreparation of regulatory framework forthe power sector; and (ii) thepreparation of plans for theprivatization of BEB. EnvironmentalAssessment Category B.

Ministry of 12.8 (R) BsliLe City Municipal Infrastructur< Consultants in the field Approved by the ExeautiveForeign Affairs, (Bank) - Will h.lp the city to rehabilitate and preparing detailed Directors on November S0,Economic develop its infrastructure, strengthen engineering studies. 1993. SigningDevelopment and its administrative capacity, and promote tentatively scheduled forEducation economic growth. Environmental Decamber 22, 1993.

Assessment Category B. Financing is provided bya PPF of US$800,000.

Ministry of 15.0 (R) Private Sector Development - To To be determined. Board presentationEconomie (Bank) provide a line of credit and technLeal scheduled for mid-MarchDevelopment, assistance in support of: (a) private 1994.Central Bank enterprise investment and development;

and (b) policy reforms to enhance theenabling environment for sustained andefficient private sector development,and to make the financial sector more*ffiieint and competitive.Environmental Assessment Cat.RorY B.

To be determined 14.6 (N) Rural Development - To increase the To be determind. Preparation under way.(IDA) standard of living and incomes of poor,

rural conmunities, The project wouldsupport small-scale investment by ruralcommunities to support or diversify

their productive activities, e.g. inroad, infrastructure, watershed andother natural resource mnag ementLnterventions, and adaptive technologyand transfer. Environmental AssessmentCate&or: To Be Determined.

Suprem Court 9.9 Regulatory and Judicial Reform - Project Consulting services will Preparation under way.Capitalization (IDA) will assist In rationalizing the role of be required for projectSecretariat the State in key economic sectors and preparation Ln the areaJ

reform those components of its legal and of human resourceinstitutional infrastructure that are management, judicialconsidered critical for developing en training and informationenvironment that fosters private systems.investment. Environmental AssessmentCategory C.

MlnLstry of 15.0 (R) Bolivia Civil Service - To create a To be determined. Pre-apprLaeel missionFinance (IDA) modern civil service for Bolivia by scheduled for early

upgrading salaries, downsizing through January 1995.attrition end job grading, and upgradingrecruitment and training policies.Environmental Assessment Category C.

- 96 -

H.bsr Country, Amount olcpleniMotlg Probable 8tag of PrO Icg .Agency LoMader project C Conaulting services Aation an Pocurenmnt 4

(Cont Id)

Pondo de Inversion 40.0 (R) Social Investmaet Fund II - To To be determined. Approved by the ExecutiveSocial (FIS) (IDA) support the continuation of the Dlrectors on June 29,

Government's program to improve basic 1993. Credit vas signedservices in health and education, on December 8, 1993.Envirowmental Asessment Catezorr C.

Rstroactive financinc ofup to 10% Wvii beconsideret.

HACA (Ministry of 20.0 Land Administration - To Lmprove land Consulting services are Project preparation underAgriculture) (IDA) allocation, revise the agrarian required to support way.

legislation, build up a national project preparationcadastrelregistry system for rural land, (pilot lsnd titling,and to lIpleent a titling cadastral agency,regularisation program. Znvironmental institutional design)Assessment Cateaorv C.

Ministerio de 35.0 Natural Gas Export - The project Consulting services will Preparation under way.Energia a (IDA) includes: Ca) export of 8-16 million be required for:Hidrocarburos 'Iday of natural gas through a 1900 km (e) preparation of

pipeline from Santa Cruz (Bolivia) to regulatory framework;Sao Paulo (Iresil)t (b) technical (b) gas roserv aassistance to the Govornment of Bolivia certificationlgas fieldto help attract private investment in development programs andgas reserves development and in (C) enviro3mentalimplemnting the project; and (c) public assessment.lnfrastructure to support the projectimplemntation. EnvironmentalAssessment Cateeory D.

Ministry of Energy 20.7 Hydrocarbon Deregulation Restructuring Consulting services vlll Appraisal missionsnd Hydrocarbon (IDA) and Engineering - The main objective is cover all activities of scheduled fer early 1994.(MHE) to help the Government open up the the hydrocarbon *-ctor, A PIP of US51.0 mllion

sector to private investmt, capitalise and will be done through snd a Jap e*se GrantYacimientos Petroliferos eisctlcs foreign and local Facility of 1 71,0Bolivianos (YPFB) with private investor consultants end million providedparticipation and strengthen SOE end firms, financing for preparationSORA. Environmental Assessment Cateaorv of the project.

Organtsmo Nacional 50.7 (R) Integrated Child Development - To be determined, Approved by the ftecativedel Nino, La Mujer (IDA) Project seeks to implement a national Directors on June 29,y la Femilia program of childhood development and 1993. Credit signing(ONAMPA) nutrition interventions aimd at expected by January 1994.

increasing the educational and A PPF of US$750,000nutritional level of children under provides financing.five, and stimulating eployment amongpoor urban end semi-urban womn.Evir,onmental Asessment Catesorv C.

Hinistry of Humn 25.0 (R) Municipal Development - Policy Consultants in the field Board presentationDevelopmnt and (IDA) reform end institutional strengthening completiag project scheduled for end JanuaryFNDR (Regional ln the ares of municipal finance and preparation activities. 1994.Development Fund) management. Line of credit for

investment projcets in municipalinfrastructure end services.Environrental Assessment Catetorv B.

97

homber Cotmtry, oount sImplementing Probable Stag of Prnceaima dAgency Lender Project ' Consulting Services ActiLn cm ProcureMOnt'

BOLIVIA(Cont'd)

Mliinstry of 50.0 (R) Capitalization Adjustment (formerly Consulting services will Appraisal missiOn In theFinance and (IDA) Private Sector Development and be required for field.Economic Capitalization) - To assist the assessment of majorDevelopment Government's program of privatixing sectors.

public enterprists, establishappropriate regulatory framework andhelp remove legal constraints inhibitingprivate enterprises. EnvironmentalAssessment CateRory B.

Ministries of 40.0 (R) Education Reform, Institutional To be determined. Post appraisal mission inPlanning and (IDA) Strengthening and Quality Improvement - the field.Coordination/ Support the Government's planned reform Fin-ncina is provided byEducation and of the educatioz system and a PPP of US$950,000.Culture decentralization of public education Japanese Grant funds have

services. Environmental Assessment been approved in theCategory C. amount of US$1.1 million

an December 15, 1992.

Retroactive financina ofUP to 10X of loan amountwill be consideted.

To be determined 19.5 (R) Environment, Industry and Mining - To be determined. Preparation under way.(IDA) Further support for mining sector reform

program and development of privatesector in an environmentally soundmanner. Environmental AssessmentCateaorv B.

DAER - 63.0 (N) State Highway Management - Rio Consulting services will Appraisal completed.Departamento (Bank) Grande de Sul - Supports rehabilitation be required for Date of negotiations toAutonomo de and maintenance of the state highway *ngineering, be determined.Estradas de network and strengthen state and road constructionRodagem maintenance capacities. Environmental supervision, and

Assessment Categorv B. technical assistance.

State Education 98.5 (R) Parana Basic Education - The project Consultants (mostly Negotiations tentativelySecretariat (SEED) (Bank) seeks to improve educational achievement individual) will be scheduled for January

among public school primary students in required in specialized 1994.the State of Parmna. The project will areas of institutionalhave support improvements in the quality developments. Retroactive financing ofand availability of books and other up to 5 of the loaneducational materials, teacher training, mount would bephysical infrastructure and system considered to hel startmanagemnt at both the state and isaolemntation of uro2ectmunicipal levels. EnvironmentalAssessment Cateaorv C.

- 98 -

Member Coutry, AuV tqipl isntsng Probable Stage of Prsoes*ag and

Ag4ncy Lender t Project * Comsultlg Services Actian eo Pzecurannt

(Cont'd)

State Education 151.0 (R) xinas Gerais Education Quality Individual consultants Negotiations tentativelySecretariat (Bank) Improvement (ProQualidade) - This and consulting firms scheduled for January(SEE/MG) project will seek to improve educational will b- required to 1994.

achievement in the State of Minas Cerais develop Msnagementby providing a package of essential information systems, RltroatLve fInancin ofeducational inputs and services to carry out educational uD to 72 of the loanpublic school childron and supporting research and training amount would bcgovernment institutions to change programs, provide considered to hlin startinvestmnt patterns, rmagement systems technical Assistance in imolementation of araiectand policy frameworks. Environmental measurement and teating, eomoonts Assexsment Category C. and execute civil vorks-

related surveys.

State Education 20.5 (R) Espirito Santo Basic Education - Consultants (mostly Negotiations tentativelySecretariat (SIDU) (Bank) This project aim at improving the individual) will be schodulod for January

quality and efficiency of basic public required in specialized 1994.education in 12 state municipalities by srezas of institutionalproviding financing in support of. developments. Retroactive financian ef(a) increased quality and efficiency of uo to 5X of the loanlnstruction in first and second grades: ag9u yvald be(b) improvement and expansion of pre- considered to hl1D stSrtschool proarams; and (c) institutional imolemen tlon of yroiectstrengthening at the state and municipal coemonents.lvel. Environmental AssessmentCate.or" C.

CESAN and SEAHA 140.0 (R) Water Soctor and Coastal Pollution Consulting services vill Appraisal report under(Bank) Control in Espirito Santo - The project be required for preparatLon.

will: (a) increase vater supply and institutionalsewerage coverage and service qualityl strengthening of CESAN(b) reduce current levels of coastal and ad SEAMA.rive-r pollution. (c) promote corporateauthority and institutionalaccountability of CESN and SEAMA; and(d) assist in preparing proposalsdealing vith collection and dLiposal ofsolid waste and initial pilot project.Environmental Assessment Category B

Secretary of 350 0 tR) Sao Paulo Integrated Urban Transport To be determined. Appraisal miasion in theTransport of Sao (Bank) - Project vill integrate the rail-based field.Paulo modes in the Sao Paulo Metropolitan (Cofinanclng of about

region (including CBTU, PEPASA, METR0) US$38S.0 million will beand the Sao Paulo Municipal bus system required.)seeking a reduction of buses on thestreets, reducing travel times, andimproving the environmentEnvironmental Assessment Catezorv B.

Departamento de 220.0 (R) State Highways Management IT - Consultant services will NegotiatLons completed.Estradas do (Bank) Rehabilitation, periodic maintenance, bc required for Board presentationRodagec de Karanho and upgrading of state highways and engineering, scheduled for(DER-MA), strengthening of state highway construction February 22, 1994.Depart-mnto do department's maintnance capabilities in supervision, andEstradas de the states of Maranhao, Piaui and technical assistance.Rodag,ea do Piaui Tocantins. Environmental Assessment(DER-PI), Governo Catgaorv B.do Estado doTocantins InfrastructureSecretariat(SEIMF-TO)

- 99 -

tibeb C-atry, Knnt &1Iepl ct1ng Probable Stage f Pr1omssin and

AgncyC I L-emur 2 Project s Coamultms S ervice Actioa on PSraaurmnst 4

(Cont'd)

Ministry of l5. 0 Telecom T.A. - Support the Government in Consulting services will Project preparation under

Coemmnications (Sank) implementing policy reform and be required for studios way.structural reorganization in the and technicalt-l-comununications sector. assistance.Environmental Assessment Category C.

Ministry of 160.0 AIDS and STD Control - Investments to To be dotermined. Approved by the Executive

Health, (Bank) stem the AIDS epidemic and associated Directors on tovember 9,

Bational Program diseases (other sexually transmitted 1993.

for AIDS1STD diseases and tuberculosis), throughControl preventive measures, improved Retroactive financlrn is

surveillance, more cost-effective oxRected.

treatment interventions, andinstitutional development.Environmental Assessment Catesory B.

Federal Railvay Up to Railway Reform - Restructuring of RFFSA To be determined. Identification under way.

Export Company 250.0 and rehabilitation of track in major

(RFFSA) (Bank) railway corridors to enableprivatization of railway servic*s.Environmental Assessment Category .

IRFRAZRD Up to INFRAERO Reform - Finance time-slice of To be determined. Project under

100.0 INFRAERO's investment program and preparation.

(Bank) support sectoral regulatory reforms.Environmental Assessment Categorv: ToBe Determined.

Companhia Vale Up to (R) Environmental Conservation and Consulting services vill Negotiations have been

do Rio Docs 43.0 Rehabilitation - Supports the be required for impact substantially completed.

(Bank) environmental program of Compania Vale assessment anddo Rio Dace (CVRD) which includes: environmental auditing(a) an industrial and mining pollution studies.control componenta (b) natural resourcescomponenti (c) a research anddevelopment component for thepreservation of ecosystems; and

(d) socially-oriented investments.Environmental Assessment Cateaorv B.

Dep-rtamento Up to Federal Highway II - Will support Consulting services Project preparation under

EaClonal do 150.0 decentralization of highvay will be required for way.

Istradas do (Bank) administration and private sector engineering and work

Rodgem (DRER) involvement in highway construction, supervision, end for

operation and maintenance. Would also institutionalhelp finance the federal highway strengthening.rehabilitation and maintenance programs.Environmental Assessment Categorv B.

Secretaria de Up to Land Msnagemant IV (Mato Grosso do Sul) To be determined. Pre-appraisal mission

Agricultura, 30.0 - To improve natural resources scheduled for February

Pecuaria a (Bank) protection in Pantenal watershed and 1994.

Desenvolviaento gonarate sustainable productivity gains

Agrario do Estado through improved land manasgment and

d- Hato Grosso do soil conservation within abut 350

Sul (SECAP-MS) catcho ntsloicrocatchments in the State

of Mato Grosso do Sul. EnvironmentalAsssament Category B.

- 100 -

Aber tC try, -t ste o FrOCeSSlfandIEpI_tSas Probablehemc' IA.de Projeet3 Conulting Services Acticn on PrtCumenft

(Cont d)

Se¢retaria de Up to (R) Water Quality and Pollution Control The borrowers will make Approved by the ExecutiveEnergia * 245.0 (Sao Paulo and Parana) - Help sector extensive use of Directors on July 2,Sensamento (Sao (Bank) authorities to address water pollution consultants for 1992. Loans to SBo PauloPaulo), Sacretaria issues through a self- sustained preparation of projects, and Parana signed onde Planejeu to investment project in the most congested studies and December 17, 1992. Loan(Parana) areas of Brazil, to develop institutional to the Federal Government

methodologies to address the cleaning of strengthening programs. expected to be signed inenvironment, and specifically to mnage January 1994.scarce water sources for humanconsumption and agricultur.-Environmental Assessment Category A.

Ministry of Health Up to Quality Assurance - Support for To be determined. Project preparation under200.0 strengthening Government's normative and way.(Bank) regulatory roles in health and

epidemiological surveyance.Environmental Assessment Category C.

Sao Paulo State Up to Land Xanagement III (Sao Paulo) - To Consulting services will Negotiations postponed atSecretariat of 55.0 generate environmental benefits and be required for about the request of theAgriculture and (Bank) sustainable productivity gains through 12 staffmonths for Government.SupplY (SAA-SP)- iproved land management and soil organizing training.

conservation within about 2,000microcatchments involving 120,000farmers in Sao Paulo. EnvironmentalAssessment Category B.

Ministry of Up to (R) Northeast Basic Education III - The Consulting services will Approved by the ExecutiveEducation 206.7 project will support basic education in be required in the area Directors an November 23,

(Baank) up to five status in the Northeast. of education management. 1993.Environmental Assessment Catetorv C.

Departmento de 88.0 (R) State Highways Management Project - Consultant services will Approved by the ExecutiveEstradas do (Bank) Rehabilitation and periodic maintenance be required for Directors on December 22,Rodage (DIR) in of state highways and strengthening of engineering, 1992. Loan to Santathe states of state highway department's maintenance construction supervision Catarina signed onAlagoas and Sta. capabilities in the states of Alagoas, and technical December 22, 1992.Caterina and Santa Catarina. Includes a assistance. Signing of Alagoas loan

comDonent to strenathen the state expected end Decemberhishwav agencies' environmental 1993.capacity. Environmental AssessmentCategorv B. Retroactive financing

would be considered up to10X of the loan amount tohelp start imolementationof nroiect comnonents.

Ministry of Up to Irrigation Subs-ctor II - Private To be determined. Project preparation onAgriculture, 200.0 Irrigation (follow-up to Irrigation hold pending Government'sNational (Bank) Subsector r) in Northeast. assignment of priority toIrrigation Environmental Assessment Catesorv B. project.Secretariat

- 101 -

Xwbbr Couatzy, An ut £Implementing Probable stage of racessneag *nd

1.Lu,dr projet jCoexultng Servleem ction Ca Pprc: rnent

Caribbean 20.0 (R) CDB VI - Xew global line of eredit To be determined. Appraisal report underDevelopment -ank (Bank) for CDB to be on-Lent mainly for OECS preparation.

10.9 eountriesa CDB would lend in support of(IDA) public as well as private sector

projects that the Bank/IDA normallyfinance, and would be available forlending for investmnt in fixed assetsand working capital or for technicalassistance. Environmental AssessmentCaLt.orv C.

OECS Secretariat - 5.8 (R) OECS Waste Management - An CECS Consulting services will Appraisal missionRegional (Bank) regional project dsdressing: b- required for scheduled for early 1994.eamponent; 5.8 (a) priority investments in solid wastes implementation of the (Financing from theRespective OECS (IDA) (b) technical assistance for liquid project. Global EnvironmentWaste l(mt. waste; and (c) a component focussing on Facility (GEl) in theAuthorities - policies and institutional issues amount of US$14.0 millionNat'l component related to waste management. has been confirmed.)

Environmental Assessment Catesorv .

Retroactive financina ofun to lOX of the loan/credit will be con4ideredto helD exoedite nroiectinmlementation.

Caribbean 7.5 CECS Regional Education - Enhance access To be determined. Project preparation underDevelopment Bank (lank)I and quality of basic education and vay.

7.6 strengthen institutional capacity of(IDA) select OECS Governments to mnage Retroactive financina of

education reform (Dominica, St. Vineent uo to 0l of loan/creditand Grenadines, St. Lucia and posasibly mea be considered.St. Kitta). Environmental AssessmentCateeory C.

To be determined 75.0 Second Irrigation Development Need for consultants not Project preparation to(Bank) (PROMM II) - Follow-up project which yet determined, begin March 1994.

would build on and reinforce the coreobjectives of the successful first phasewhich are to: (a) improve the operationand efficioncy of existing and futureirrigation schemes; (b) promote betterall,ocation and austainability ofirrigation investments; andCa) strengthen the capacity of userorganizations and small farmers to takeadvantage of improved irrigatedagriculture. Environmental AssessmentCateeorv: To -e Determined.

Xinistry of 125.0 (R) Higher Education Reform (form rly Consulting services will Project preparation underEducation (Bank) Poet-Secondary Technical and Science be r-quired. way.

Education Development) - The projectwould aim to; (a) diversify non-university technical training;(b) Lmprovo equity of aceess to poJt-secondary education; (c) strengthensystem management; and (d) raise theproductivity and quality of post-secondary institutions. ironmtAssessment Category: To Be Determined.

- 102 -

Member Comtry, Amount &TM iNNmtiuw PzabbU Stage of Processing andAgency I prej3et ' Coxuting 8ervicx Actien an Proc -u dnt

(Cont'd)

To be determined 120.0 (R) Water Resource Management - Consulting services will Identification under war.(Bank) Strengthening of Water Basin Resources likely be needed for Japanese Grant for

Management and Institutions and engineering, project preparationfinancing of high priority investments construction supervision signed.in water supply and water pollution and technicalabatment. Environmental Assessment assistance. Procurement: InvitationCateRary B. for proposal has been

issued for technicalassistance studies to befinanced under a JapaneseGrant for projectpreparation.

Xinisterio de 60.0 (R) Secano Agriculture Development I - To be determined: Project preparation underAgricultura (Bank) Support of the ministry's efforts for vay.

agricultural development and resource Japanese Crant has beenmanagement in the Secano area. Approved.Environmental Assessment Cateaorv B.

Ministry of 80.0 (R) Secondary Education Improvement - Consulting services are Project preparation underZducation (Dank) The project would: (a) enhance the being utilized in: way. Pre-appraisal

efficiency, quality and equity of (a) teaching of scienes mission seb duled for Maysecondary education, (b) improve the educations and 1994.organization of secondary education by (b) organization ofstrengthening the institutional capacity secondary systems.of the Ministry of Education,municipalities and educationalcorporationss and (c) improve costofficiency of secondary education.Environmental Assessment Catesorv C.

Ministry of 10.0 Regulatory Reform (TAL) - To assist the Consulting services Project underEconomy (Bank) Government in streamlining th- current under selection, preparation.

regulatory framework in electricity "ad A PPF advance ofgas. Rnvironmental Assessment Category USS250,000 was approved2 - on February 10, 1993.

Ministry of 10.0 (R) Municipal Development Pilot - Consulting services will Approved by the ExecutiveInterior ad (lank) Project will provide assistance to the be required for Directors December 7,Municipalities Government in enhancing efficiency, technical assistance in 1993.

equity, and flscal discipline in the municipal management,municipal public sector. The project finances, information Retroactive financina ofvould consist of mnicipal and national systems and training of uo to USS1.0 millioninstitutional development components. municipal staff. apnroved.Environmental Assessment Category: ToBe Determined.

Roads Directorate 200.0 (R) Third Road Sector - Project to Consultants will be Appraisal report under'of Ministry of (Bank) finance maintenance and further required for preparation.Public Works (MOP) development of national road system, engineering, Negotiations tentatively

whle- supporting privatization and road construction supervision scheduled for May 1994.safety initiatives. Project is a follow and technical assistanceup to Road Sector II (Ln. 3120-CH). ln areas such as: roadEnvironmental Assessment Category B. safety, pavement

management, geographicinformation systems, andenvironmentalassessment.

h wb-r Cvuntxy, Aoaut Stee of rtm.esS andApeoAy 1 Lt"' r Project 3 Cassulting Serices Aatlm am Prom i nt'*

National Plaaing 15.0 (R) Energy Sector Technical Assistance - Consulting services will Appraisal report underDepartennt (Bank) The project soeks to facilitate and bo requirod for energy preparation.speed up the transition from a publicly- sector regulation,owned *enrgy Sector organisation to one enrgy demandwith private participation, thereby mange ment,reducing implementation costs and time. environmental studios,The projct aims at institution building end privatisation.by transferring specialized man-gementskills, facilitating private sectorparticipation =ad pricing reforms,together with envlronmental regulationand demand-side management. The projectwill seek tot (a) strengthen therecently ctrated regulation andpolicylstrategy planning organizationsIn order to help them build upexperience, thereby increasing theirchances of performing efficientlyl and(b) mplemnt sector-.pecific strategiesaimd at dtveloping the energy sector,respecting environmental constraints andattracting private investment.Environmntal Assessment Cartzorr C

To be determined 45.0 Technology Policy and Development - to Need for consultants not Project preparation under(Bfank) correct existing shortcomings in the yet determined way.

technalogy tranfer policies andevaluations, end develop institutionalmchanisms to strengthen technologydevelopment and adaptation activLties bythe private sector. EnvironmentalAssessment Category C.

to be determined 15.0 PcnsionlSocisl Security System Reform - ieed for censultants not Project ubder(Bank) Project will support Colonbian social yet determined, preparation.

security reform by assisting in:(a) development of rules andinstitutions to supervise and regulatethe now system; (b) auditing endrestructuring of the over 1,000 pensioninstitutions and placing them on anactuarial basisg and (c) iprovinginformation systems in the oldinstitutions to facilitate thetransition to the new system.EnviroMntal Assessment Categoryt ToDo Determined.

Emresaa do 250.0 (R) Santa Fe I (Water Supply £ Sewerage) Consulting services to Appraisal mission in theAguaducto y (bank) - Rehabilitation of water supply and be determined, but field.Alcantazillado de sewerage systems of Bogota, which likely to be required insOgota (ZMS) focuses on the urban poor, expanded a number of areas.private sector involvemnt in provisionof public services, and institutionalrestructuring for efficiency.Environmental Assessment Category B.

- 104 -

Member Ccuntzy, Amount SDmpli nt5n Probable Stage of Processing and4 ency s t Z--r e Project Consulting Services Action on procuromnt '

(Cont'd)

MLnistry of 30.0 (R) Public Financial Management - Design Consulting services will Approved by the ExecutiveFinance (Bank) and implementation of an integrated be required. Directors on December 7,

budgeting and financial managesmnt 1993.system for the central government. Theproject also includes elements tostrengthen revenue collection andmanagement of resource mobilizationagencl-s including tax and customsagencies. Environmental AssessmentCategorV C.

To be determined 323.0 Private Sector Energy Development - To To be determined. Preparation under way.(Bank) support the Government's program to

restructure the energy sector. Specific Retroactive financina isobjectives are to: (a) improve likely to be lncluded.regulatory and institutional framework,and the structure of the power sector toenhance sector efficiency andcontestability; and (b) promoteparticipation of private investors inownershiploperation of electric powergenerator. Environmental AssessmentCategory S.

To be determined 200.0 Departmental Roads - The project will To be determLned. Project preparation will(Bank) provide: (a) technical assistance to begin upon approval by

strengthen the capability of the Covernment of the nowdepartmental agencies to plan and law for decentralizationimplement road investments and of the transport sector.maintenance, and of the central highways Project amount and scopeagency to oversee and advise will be reviewed in linedepartmental road agenciest and with Departamento(b) implementation of balanced programs Nacional de Planeacion'sof paving, rehabilitation and (DNP) reassessment ofmaintenance of roads in four pilot Colombia's futuredepartments. Environmental Assessment macroeconomic conditions.

Category: To Be Determined.

Departamento 39.0 Natural Resource Management - To develop Consulting services NegotiationsNacional do (Bank) policies and mechanisms that would required for forest substantially completed.Planeacion (DOP) contribute to arrest the ongoing sector review, Board presentation

degradation of natural renewable ecological zoning, and scheduled for lateresources in Western Colombia through: environmental December 1993.(a) the development of a national forest monitoring.policy and of a strategy for natural Retroactive financint ofresources management in the Chocd un to 3.9 m has beenRegion; (b) the protection of selected proposed.watersheds; (c) national parksmanagementt and (d) education, training,research and technical assistance forProgram managemnt, project preparation,monitoring and evaluationEnvironmental Assessment Category B.

MLnistry of 90 0 (R) Secondary Education - To improve the To be determined. Approved by the ExecuttveEducation (ME) (Bank) coverage, quality and cost effectiveness Directors on December 16,

of secondary education. Environmental 1993.Assessment Categorv C.

Retroactive financing ofup to 10X will beconsidered.

- 105 -

}1r Coemtry. A_et stt of aImple ting ProbableA190.07' Lender Project' Consulting S-rvice Actiogcm Procureenmt

(Cant 'd)

To be determined 25.0 (R) Financial Sector and Capital Markets To be d4terrmned. Appraisal mission in the(Rank) Development - To support sector reforms field.

to improve the structure, efficiency andcompetitiveness of the financial system,and to remove the existing constraintsto capital markets devclopment.Environmental Assessment Cate2orv C

Banco de Comarco 50.0 Export Development - Project will Consulting services vill Approved by the ExecutiveExterior (Bank) support the components of the be required in trade Directors on May 25,(WNCOLDEX) government's cconomic modernisation administration, export 1993.

program focusing on trade facilitation promotion, and exportpolicies, institutional strengthening finance. Retroactive financing ofmeasures to foster Colombia's non- up to USSS.0 million Lstraditional exports. Environmental included.Assessment Cateeorv C.

Ministry of 46.0 (R) Agricultural Technology - To improve Consulting services wlll Negotiations scheduledAgriculturo (Bank) agricultural productivity primarily of be required for for mid-April 1994.

small-scale farmers by improving the extension researchquality and efficiency of research by training and Retroactive financine ofintroducing a demand driven competitive institutional up to USS4.6 million isselection system which would provide strengthening. included.cofinancing to universities and publicand private sector entities.Environmental Assessment Cateaorv C.

Bogota District 65.0 tR) Bogota Transport - Improve transport Consultants vill be Board presentationGovernent (Bank) conditions in Bogota promote more required for work scheduled for end June

efficient use of existing infra- supervision and 1994.structure, and strengthen the technical assistance.institutions in charge of planning, R troactive fiancin ofmanaging and maintaining the city's up to US32.2 millio- wiltransport infrastructure. Environmental be orovided.Assessment Catesarv B.

Ministry of 3I.0 (R) Forestry and Natural Resources Need for consultants to Project preparation. underEnergy, Mines end (Cank) Conservation - Communication and be determined, way.Natural Resources extension support for natural forest (Cofinancing expected to

manaement and plantation activities. be provided by anotherIUill also includo: (a) support to international financialprotective are- system and indigenous institution.)reserves; (b) development fund forconservation activities; and(e) research into forest management andnon-traditional wood products.Environmental Assessment Cateeorv B.

C9j& Costarricense 22.0 (P) Health/Sector Reform - The project Consulting services will Approved by th Executivedel Seguro Social (Bank) would support the implemetatiton of the be required. Directors on October 21,(CCSS) end Government's state reform program for 1993. Loan was signed onHinistry of Health the health sector, focusing on: December 6, 1993.

institutional developmentl strengtheningof basic health delivery systems; Retroactive financing ofprivatization of services; studieos end Up to U381.0 million willoporational research. Environmental be provided.Assessment Cateaorv C.

- 106 -

Umber COautry7. Aomt &Ipl =ntIas Ptobable State of Processing AndAg.ncy rLoulr $ Project J Consulting Services Actio an Proourminte

To ba determ-ned 75.0 (R) Private and Public Enterprise Reform Need for consultants not Project identification(Bank) - To help articulate and implement yet determined, under way.

programs for rationalization,restructuring and/or privatization ofpublic sector enterprises.EnvLronmental Assessment Category C

Corporacion 70.0 (R) Power II - The project may includet To be dettermined. Appraisal departureDominicana de (Bank) (a) construction of a 125 MW coal-fired scheduled for mid-MarchElectrioidad thermal plant, a substation and a 1994.

transmission lines and (b) technicalassistance to (i) prepare and implement Retroactive financinaa comprehensive security package, will likely be included.(ii) strengthen sector regulatorycapabilities; and (iii) facilitate theimplementation of privatizationstrategy. Environmental AssessmentCategorv B.

Central Bank 51.0 (R) Private Sector Development - Will Consulting services will Board presentation(Bank) support structural reform in the be required for tentatively scheduled for

financial sector aimed at establishing a strengthening banking end March 1994.transparent and competitive financial supervision, second tierStructure. Will also provide a general intermediation, andline of credit to finance investment foreign assetsrequiremnts by the private sector management.following market mechanisms for theallocation of credit. EnvironmentalAssessment Catezorn C.

Instituto Nacional 26.0 (R) Irrigatod Land end Watershed To be determined. Negotiations scheduledde Reouresa (Bank) Management - Increased agricultural for end January 1994.8idraulicos output and productivity from areas with

existing irrigation infrastructure. Retrosctive financinsPro1ect includes a iilot Program for the will be proposed durintmanaaement of related vatersheds and nexotiations.measures to vrotect against waterlogninaand salinization. EnvironmentalAssessment Category .

To be determined 35.0 (R) Agricultural Services - Need for consultants not Project preparation to(Bank) Strengthening of agricultural research, yet determined, begin January 1994.

extension, animal health and plant Japaneso Grant Approvedprotection services. Environmental but not yet signed.Assessment Catezory: To Be Determined.

To be determined 25.0 Modernization of State Technical Consulting services will Project preparation under(Bank) Assistance - Project to include: be required, wVA.

(a) preparatory work for streamlining A PPF advance has beanpublic sectors (b) technical assistance approvd.for implementing budget reforma and(c) streamlining and strengtheningpublic sector capacity to evaluate andimplement programs. EnvironmentalAssessment Category C

- 107 -

VIber Country, *lsoum &INPluxting Probable Stage of Processing andAgency Lon 2-' Project ' Condulting Services Actiea an Procu_emi '

(Cont' d)

Ministry of 25.0 (R) Agricultural Census and Information To be determined. Project preparation underAgriculture (Bank) System - Improvement of database for iay.

sectoral decis-ion-making end plaming.Environenta&l AssessMent CategorX C.

ministry of 26.0 (R) Irrigation Technical Assist-nce - To be determined. Project preparation underAgriculture (Bank) Support for the irrigation subsector to way.

carry outt (a) b*sic technical and Japanese Grant approvedlegal studies, (b) institutional but not yet signed.strengtheningi and (a) feasibilitystudies and engineering designs ofschemes for possible investmentoperation. Environmental AssessmentCategory B.

Social Investment 30.0 (R) Social Investment Fund - The project Consultants will be Negotiations in progress.Fund (Cank) would finance operations of a social required during project

investment fund oriented to providing implementation. Retroactive finsetina ofboth social compensation to vulnerable UP to USS3.0 million isgroups durtig adjustment and to included.investments in poverty alleviation.Environmental Assessment Catetorv B.

Kinisterio de 20.0 Public Enterprise Reform (TAL) - To Consulting aervices will Loan docunents underRnergti y Kinms (Bank) assist in developing a legal end be required. preparation.

regulatory framework permitting the A PPF advance has beenrestructuring of the energy sector, and approved.providing the foundation for privatesector participation in energy and other Retroactive financinasectors of the economy. Environmental vill likely be included.Assessment Cateaorv C.

ministerto de 14.0 TA Mining - Support restructuring and Consultants will be Approved by the ExecutiveEnergia y Mines (Bank) strengthening of inAtitutional framework required. Directors on October 21,

to foster private sector investment, 1993.technological and management upgrade of (Cofinancing from*mall scale gold mining including International Technicalenvironmental control and social issues. and Economic CorporationEnvironmental Assessment Cataeory A. (BITS) and Overseas

Development Association(ODA) in process.)

Retroactive finaicing ofup to USS4AQO000PPrEoved.

Ministerio de 10.0 Technical Assistance Environment - Consultants will be Project preparation underEnergia y Minas, (Bank) Te-hnical assistance for addressing required. way.Subseoretaria de institutional framework for A PPF advance has beenEnv environmental issues In Ecuador. approved.

Environmental Assessment Category C. (Cofinancoing from theGlobal EnvironmentFacility (CEP) endMontreal Protocol.)

- 108 -

Nmber Contmry, noune t'Ar'se-ting Probable Stage of Proceaslng andheenmy leader Projecta Consulting services Actioo eon Proaame- t

EL S

Ministerio de 40.0 Urban Development - Project focus is on Consulting services will Project identificationPlanificacion (Bank) the metropolitan area of San Salvador be n -eded during under way.

emphasizing: (a) land management and preappraisal andneighborhood upgrading, (b) urban appraisal in the areastran#port; (c) solid waste management; of (a) landand (d) municipal and metropolitan managementsorganization. Environmental Assessment (b) earthquake risksCategory: To Be Determined. amanagement; (a) urban

transport; and (d) solidwaste; (e) decentraliza-tion of centralgovernment services.

Ministries of 30.0 Social Sectors Rehabilitation II - Need for consultants not Project idtntificationPlanning, (Bank) Project is likely to have two main yet determined, under way.Education, and components: (a) targeted basic servicesHealth developmentg and (b) institutional

development in the Ministries of Health*nd Education focusing ondecentralization *fforts. EnvironmentalAssessment Category C.

xnIPLAICEL 50.0 (R) Energy Sector Modernization - Consulting services vill Appraisal mission in the(Bank) Support for the modernization of the be required. field.

powaer sector including technicalassistance for implementing sectoralprograms and studies and investment inthe modernization of generation,transmission, and distribution systms.Environmental Assessment Cat eorv B.

Ministry of 50.0 Basic Education III - The project is a Consulting services will Project identificationEducation (Bank) follow-up of the ongoing Second Basic be required, under way.

Education Project. It would aim atcompleting the work originally envisagedin the ongoing project which includes:(a) expansion and rehabilitation of theexisting school capacity; (b) provisionof learning materials includingtextbooks, teacher training programs andbilingual educations and(c) strengthening management of MOE atthe central level and decentralizationand strengthening of administration atthe regional and school level.Environmental Assessment Category C.

Ministry of 25.0 (R) Agricultural Technology and Land Consulting services will Project preparation underAgriculture (Bank) Administration - To strengthen be required. way.

agricultural technology generation andtransfer and increase the efficiency andaccessability of the land registrysystem. Environmental AssessmentCategory B.

- 109 -

member Cmmotzy AWOUmt Slupli ntin* lrobabl* St. of Prooe55lS mnd4 ocy t lendnr' ; Project Cansulting Services Action an PrOcue mnt 4

(Cont'd)

ministry of Health 50.0 Social and Economic Modernization - Loan To be determinad- Project identification(Bank) vould support the continuation of the under wy.

macro-economic reforms initiated underthe Economic Modernization Loan. Itwould also support key policy changesand Lnstitutional reforms in the healthsector, vhich would load to improvamantand expansion of the health sectorserviess for the poor. EnvironmentalAssessment Categorv B

Bauxita Industry 26.1 Bauxite Rehabilitatton - ProJect will Investment bankin5 Project preparation underDevelopment (IDA) assist Government with offorts to services will be sought way.Company Ltd. rehabilitate and privatise its main in the next fev weeks.(BIDCo) bauxite operation, including partial

financing of Government's share ofinvestment program to ensure reliablequality and quantity of output andimprove operational efficiency.Environmental Assessment Catetorv A

Guyan, Water 14.0 (R) WaterlSewerage - Project ineludes; Consulting services will Board presentationAuthority (IDA) (a) institutional component to te required. scheduled for

strengthen nationallregional water December 21, 1993.sector agencies and their operations; A PPF advance of(b) human resources detvlopment program US$0.958 m vas approvedin the sectors (c) rehabilitation of in September 1992.regional facilities. end (d) establish-ment of an improved operational endmaintenance program. EnvironmentalAsse-sment Category B.

Ministry of 14.0 (R) Private Sector Development Consulting services will Appraisal mission in theFimsnce (IDA) Adjustment (formerly Private Sector be required inx field.

Development) - The project would (a) banking aupervisionsupport; (a) reform of the financial and regulation; (b) thesector to strengthen regulation and analysis of financialsupervision and to promote capital sector institutionstmarket development; (b) a reform of the (a) tax reforml andtax system to lower rates while (d) Government serviceseliminating exemptions end tax holidays; to mining end industry.(a) a reduction and rationalization oftariff ratest and (d) improvements inGCovrnment services to the privatesector. Environmental AssessmentC*telrU C.

GUYSUOO 25.0 Sugar Industry Rehabilitation and ConsultLog services Approved by the Executive(IDA) Privatization - lo expand sugarcane required during project Directors on

production to meet preferential quotas implementation for September 16, 1993.and to rationalize, privatize end restructuring theenhance the efficiency of the sugar industry.industry. Environmental AssessmentCategory B.

- 110 -

Ce mmz, A.ui UPI-muting Probabla Stae of Proci4 andAgency Leader Project Comulting Servlees Action an Procutmut'

'Am

Government of 30.0 (1) Emergency Economic Recovery - The Need for consultants not Preparation under way.Haiti (IDA) proposed operation aims to provide yet determined. Japn ese Policy and Human

urgently needed support for the Resources DevelopmetCovernment to reactivate Haiti's economy (PEED) Fund available.and initiate the economic recovery Project is pendingprocess through emergency import clearance of arears endfinaneing. The credit is designed as a resolution of politicalquick disbursing emrgency operation In situation.line vith Operational Directive 8.50.Environmental Assessment Catexorvi ToBe Determined.

Government of 10.0 (R) Technical Assistance - The proposed Need for consultants not Preparation missionHaiti (IDA) operation aims to provide technical yet determined. visited Haiti. Project

assistance for key civil service is pending clearance offunctions related to economic mangement arrears and resolution ofand implemntation of an emergeney political situation.economic recovery prograw. It will beprocessed parallel with the EmergeneyEconomic Recovery Credit (EERC).Environmental Assessment gateaorv: ToBe Determined.

To be determined 15 4 Private Sector Development - To support To be determined. Processing schedule will(IDA) devlopment of private sector industrial be decided once IDA

firms following an industrial operations in Haitirestructuring project. Envi3ronmental resume, taking intoAssessment Category B. account suspension of

disbursemnts on ongoingproject.

Ministry of 21.3 Economic and Social Fund II - Continue To be determined. Sector mission visitedFinance/Economic (IDA) to assist Government's efforts to Haiti to reactivateEconomic Social provide: (a) health, nutrition, Economic and SocialFund (ESP) education, physical infrastructure and Fund I (ESF I) in

employment opportunities and anticipation of clearance(b) channl donor financing while of arrears.strengthening co=menity groups andcooperatives. Environmental AssessmentCategory: To Be Determined.

Ministry of Public 35.0 Road Maintenance & Rehabilitation - To Consultants will be Preparation on hold dueWorks, Transport (IDA) improve road maintenance, upgrade key required. to suspension of alland Communications road sections and bridges, and operations in Haiti.

str ngthen Ministry of Public Works.Environmental Assessment Categorv B.

Organism do 28.8 (R) Agricultural Production and Land To be determined. Sector mission vlsitedDeveloppemnt du (IDA) Development - Increase agricultural/ Haiti to reviewNord (ODN) livestock production by making vacant priorities. Further

public land available to landless action pending clearancefarmers, supporting irrigation of arrears resolution ofdeelopment and protecting hilly sectors political situation.in the project area against erosion.Land =rotection measures to beintroduced under orolect. EnvironmentalAssessment Categor B.

xiebr Colutry, Ammat &Implemeting Pxubable se ef Processing *Agency Laoel 2 Project Co'uNltUng SerVices Aotia Can Procu_e't

'am(Cont d )

Ministry of 26.1 (R) Forestry and Environmental To bc determined. Approved by the ExacutiveAgriculture, (IDA) Protection - To slow the pace of natural Directors onNatural Resources resource degradation end establish the September 24, 1991.& Rural institutional and policy mechanism for Mission vifited Haiti toDevelopment Eaiti to tackle the problems of reactivate the project.(MARNDR), protection of forests and ecosystems, Further action pendingDirectorate of vood production, and of household energy clearance of arrears andNational Resources conservation. Enviromental Assessment resolution of political

Catesorv D. situation.

Ministry of 30.0 Basic Education - The project comprises: An estimated 130 months Project preparatioa underEducation (IDA) (a) improving the quality of basic of international and way.

education nationwide through increasing local consultanteffective time of instruction, training servLces vould betoachera and supervisors, providing required for projecttextbooks and learning materials, mplementation.establishing standardized externalstudent achievement *valuations, andexpanding the access to preschooleducation to poor rural and urbanchildren; (b) institutionalstrengthening through reorganization ofthe Ministry of Education, strangtheningof decentralized educational servicesand development of managementinformation systems; end Cc) technicalassistance for project management,maonitoring and ovaluation.Environmental Assessment Caterev C.

Secretariat of 55.0 (R) Public Sector Modernization Consulting services vill Project identificationFinLncel (IDA) Adjustment Credit (formerly Public b- required. under way.Presidential Sector Management Reform) - The proposedCommission for projoct will support the reform endModernization of modernization of the Honduran publtcth- state sector, including a structural

rationalization of the central anddecentralizod administration, and reformof the various employment and salaryregimes. The project will also supportImplementation of modern publicmanagement systems. EnvironmentalAssessment Category C.

Ministry of 15.0 Environmental Institutional Development Read for consultants not Project preparation undergavironment (IDA) - Development of the institutlonal yet determind, vay.

capacity of the EnvLronmentalSocretariat and provision of support forprogram- of environmental education andawareness. Environmental AssessmentCategorvy To Be Determined.

Ministry of 20.0 (R) Tax Administration Rcform - Project Consulting services will Appraisal mission in theFinance (Bank) seeks to improv tax collection in ordar be required. field.

to Insure adequate resources for themacro program, to spread the burden oftaxes more evenly, end to allow furtherreduction of tax rates. EnvironmentalAsseosment Catesory C.

- 112 -

I_ebfr Coutry, AmunSt S

JlUlmtiu Probable stage of Proea"slg enAg Lender pro j Cotsultin Servlc Action an Procurement"

(Cont'd)

Hinitry of 20.0 (R) Public Sector Reform - Project seoks To be determined. Appraisal missionFinance (Back) to rationalize- the structure of scheduled for February

Government, further reduce its overall 1994.size, and strengthen core operations.Envlronmental Assessment Catesorv C.

Ministry of 55.0 (R) Trade and Private Sector Development Consulting services will Project preparationFinane, (ank) - Further rationalisation of the trade, be required. delayed.Devlopment ad regim and public enterprise public A Japanese Crant FacilityPlanning sector expenditure, and continuation of has been approved for

regulatory reform and privatization. this loan.Environmental Asessment Categorv C.

Retroactiv financins ofup to 20X of loan amountvill be provided.

Ministry of Water 40.0 (R) Transport Sector - Project Consultants recently Project underand Transport, (Cank) components include: ea) institutional completed pro-investment preparation.Xinixtry of strengthening of, and technical studies.Construction assistance for Ministry of Water and

Transport and MinLatry of Constructiongand (b) strengtheninglpromoting privatesector involvement in publictransportation and highway construction.Environmental Assessment Catezorv B.

Ministry of 35.0 (R) Private Enterprise Investment mnd Consulting services vill Negotiations scheduledFinane, (Bank) Export Devlopment - To support private be required, for early January 1994.Developmnt and sector competitiveness through increasedPlaning improvemnts ln export support systems

in financial sector support forinvestment end trade finance.Environmental Assessment Cateeorv S.

National Water 15.0 (R) Water Supply and Sewerage Consultants recently Project preparation underComission (lank) Privatization (formerly Water Supply and completed the way.

Severage) - The project will include the feasibility studies.rehabilitation of Kingston's waterdistribution system and in particularfocus on NWC's commercial operationsincluding comprehensive metering of allcustomrs,-- and macre mtoring of thedistrLbution system. The project willalso include the rehabilitation of thesewge treatment facilities endpreparation of preliminary designs forthe Kingston Barbor Water PollutionControl Sche . vixorwtalAssessmnt Category S.

Banco Jbelinal de 100.0 (R) State end Municipal Managemnt - ConsultiUn services vill Project preparation underObras y ServicLos (Bank) ProjOet will support BANOBRAS in not be required, vwayPdblicos (IhAODRAS) providing local govrnments with

Improvements for their financlalmanament. Environental AssessmentCat ecorv To Be Determined.

- 113 -

)bIeber Caimt-y, Aount &lmp1a tlng Probable Stage of Procesaing dgenczy' t endelar Pro3ject Consulting Servics hatlna C ea Prnaumnt

(Cont d)

To be determined 200.0 Industrial Pollution Control - Project Consulting services will Identification is under(Bank) aims at (a) improving environmental be required. Way.

regulations on industrial waste:(b) strengthening Mexieo's enforcementcapabilitiesi and <c) helping industryconvert to cleaner technologies.Environmental Assessment Categor A.

To be determined 200.0 Toxic Waste - Project would support: Consulting services will Identification is under(Bank) (a) implementation of a national policy he required. way.

on toxlc and hazardous wastel end(b) assistanCe in fin4ncing thenecessary infrastructure to dispose oftoxic waste generated by industry.Environmental Assessment Category A.

Banco Nacional de 250.0 Medium-Size Cities Urban Transport II - Consulting services will Project preparation underObras y Servicios (Bank) This project would continue the work be needed for integral way.Publicos carried out under the ongoing Medium- transport studies, the(BAMOBRAS) Size Cities Urban Transport I Project national training

(3555-HE) and would contain two major program end follow-upcomponents: (a) institutional transport studies.strengthening of SEDESOL and BANOBRASand a national training scheme for urbantransport professionals; and (b) creditto qualified municipalities, toundertake integral transport studies andto implement their agreed investment andaction plans. Environmental AssessmentCatetorv B.

Secretaria do 100.0 (R) Mexico Aquaculture (fomerlyl Mexico Consulting services will Project preparation underPesea (SEPESCA) (Bank) Aquaculture and Coastal Areas be required to prepare way.

Development) - The project will promote the environmentalthe sustainable development of assessment end the stateaquaculture with a special emphasis on subprojects.poverty alleviation and the promotion ofan enabling publie sector framework foraquacultur- end coastal areadevelopment. Environmental AssessmentCategorv: To Be D-t-rmined.

Undersecretariat 200.0 National Forestry Development - The Reed for consultants to Project identificationof Forestry and (Bank) project wouldt (a) assist the be determined, under vayWildlife (SF), Government in implementing the newMinistry of forestry law and related legislationsAgricultur nd (b) improve the capacity of ejidosWater Resources (communal land holding) and communities(SARE), Inatitute to utilize and manage their forestof Ecology (INE), resources efficiently and for optimalHiniatry of Social social, economic and environmentalDevelopment goals/returns. te) promote balanced and(SEDESOL) environmentally sound land use in areas

of forests and forest vocation; and(d) support development and conservationactivities in end around "protectedareas" to conserve the integrity andbiodiversity of the "protected areas".Environmental Assessment Category B.

- 114 -

N-ber Country, Amont !ayl e-ntlfg Probable stage of Pizo-adoS ndAgency Lnder Project ConJulting Services Actiob an Proaurinet 4

(Cont d)

BANOBRAS, 370.0 (R) Northern Border Environmental Areas Consulting services not Appraisal missionFinancial Agencyg (Bank) I - To improve environmental conditions required. scheduled for January 24,SEDESOL & CNA, at the UJ.S.fMxico border throughs 1994.Technical Agency (a) strengthening of key inxtitutionsi

(b) investments in infrastructure for Retroactive financinawater supply and sanitation, solid Vill be uronosed.vaste, paving in lov-income areas and apilot program for hazardous wastemanagement; and (c) support forprotected area management.Environmntal Assessment Cateaor- A.

BANODRAS 350.0 Northern Border Environmental Areas II - Consulting sorvLcees will Project identificationFinancial Agency; (Bank) Improvemont of environmental conditions be required, under vay.SEDESOL S CNA, on the U.S./Mexico border through:Technical Aencies (a) strengthening of key institutionsi Retroactive financins

and (b) investment in environmental will likely be proposed.infrastructure. The project willcontinue measures taken under the BorderAreas I Project. EnvironmentalAssessment Cateaorv: To Be Determined.

8anco Nacional de 350 0 Water Supply and Sanitation II - ThL Consulting services Will Appraisal report underObras y Servicios (Bank) project would continue the work carried be requLrd int preparation.Publicos (BANOBRAS) out under the ongoing Water Supply and (a) preparation of

Sanitation Project (Loan 3271-ME) and master plans and Retroactive financina ofwould contain thsoe major components: (b) providing technical up to l0X of loan amount(a) investment support to local water assistance to the will be recouended.utilities and sanitation (WUS) Federal Institutions andcompanies, including through a line-of- to the water utilitiescredit to local WUs to fund subprojects; company.(b) federal institutional developmentcomponent to strengthen the capabilitiesof CNA (National Water Comission), INTA(Instituto MOLjiono de TransformacionAgraris) and BANOBRAS to provideassistance to the WU, to evaluato andsupervise the iplGemetation of sub-projects, to manage water resources, andto develop cost effective policies toprevent water pollution and(c) institutional support for WUS toassist in the preparation of masterplans, and environmental impactaesessments. Environmental AssessmentCateaorv B.

Benco Nacional de 200.0 Solid Waste II - To support a Consulting services will Project preparation underObras y Servicios (Bank) comprehenaive program to improve the be required, way.(BANOBUAS) efficiency and coverage of municipal

solid waste services in approximately30 cities. Environmental AssessmentCatcory A.

Comisidn Federal de 400.0 (R) Power Transmission and Distribution Consulting services will Project preparation underElectricidad (Bank) II - The project would assist the be required. way.

Government in reatructuring the ComiiodnFederal de Electricidad (CFE).Environmental Assessment Cateaory B.

RmOber Couatry, J"KSm t oX ple5stlng ProbnWl 8tage of Processing *sA5IIA' Leader5 Prjec cot'Cnulting Services Actioc as Pt.curn a

(coat '4)

CorlJida Nacional 200.0 Dat Safety and Flood Monitoring - The Reed for consultants not Project identificationdel Agu- (Bank) objectives of the project are to yet determined. under way.

minimize risks of dar accidents,introduce better operation to save waterari reduce flood effects through moredependable operations, decentralize thedam inspection program, and enforce ende*nure international standards of damsafety in 1,200 existing dam*.Environmental Assessment Catesory ToBe Determined

To be determined 250.0 (1) Poverty Reduction/Nutrition Consulting services to Project identifieation(Bank) (formerly Nutrition) - The project will be determined. under way.

follow up on the pilot food distributionprogrem included in the AgriculturalSector Adjustment Loan (AGSAL II). andreplicate the pilot program on a widerscale to other poor states covered bythe B-ai4 Health Care I and II projects,taking into account lessons learned fromevaluation of the pilot fooddistribution program. EnvironmentalAsoessment Catesorv: To Be Determined.

ministry of Health 250.0 Basic Health U1 - Project will follow up Consulting services to Project identification(Bank) on the existing Basic Health Care be determined. under way.

proJeCt, and aJSiSt tha Government inenhaneing the efficiency and*ffectivenass of resource use in thepublic health system, as well as improvethe quality of services in the states.The project will also strengthen theinstitutional organization andmanagement capacity of the Secretary ofHealth (SSA) to formulate nationalhealth policies, strategies, programs,monitor and supervise investments in thehealth sector. Environmental AssessmentCatoaor=: To Be Determined.

To be determined 200 0 Pro-School - To support the development Consulting services to Project identification(Bank) of pre-school education (target group is be determind. uadr way.

children age 4-5 years) which aims toprepare children of poor populationsegments for and better performance atprimary schools. EnvironmentalAssessment Cateaorv- To Be Determined.

To be detezrined 200.0 Secondary Education - To support the Consulting services to Project identification(Bank) improvemant of secondary education be determined, under way.

(grades 7-9) which have becomemandatory. It includes curriculum andtextbook development, teacher training,educational technologies, teacher's andstudant's graduation. EnvironmentalAssessment Cateaorvg To Be Detormined.

- 116 -

NAmber C&untry, Amomt &lawlementiag Probble stege of Processing andAgency ' * X Projeet' Consulting Services Action on Procuromrte 4

(Cgnt'd)

CONAmE - national 320.0 Primary Education II - The project aims ConsuLtants have been Appraisal report underCouncil for (Bank) to improve the quality and efficiency of engaged in the areas of preparation.Educational basic education in the ten states wlth teacher training, schoolDevelopment the highest incidence of poverty and construction, repetition

lowest education indicators. Three and dropout, andmajor project components include- comunity participation.(a) teacher training; (b) educationalmaterials2 and (e) institutionalstrengthening. Environmental AssessmentCate*orv C.

SEDESOL 4 0.0 Decentralization and Regional Consulting services will Project preparation under(Bank) Development II - Fin nce investments in be required. way.

small-scale infrastructure (rural roadrehabilitation and water zupply) and Retroactive financinr ofagriculture in rural areas of Mexico's up to 10 of the loanpoorest states while developing ongoing amount is likely to becapacity of rural municipalities and recommended.communities to finance and manage theseinvestments. Envircnmental AssessmentCategory B.

CNA 200.0 On-Farm and Minor Irrigation Network Consulting services wlll Negotiations under wAy.(Bank) Improvement Development - The project is be required to prepare

intended to promote private invstments 'subproj3ets in the Retroactive financina ofin existing irrigated areas, to save field, and about up to 102 of loan amountwater, to increase yields, and to US$10.0 million is will be recomoended.intensify cropping and diversity crop expected to be used tomix. Environmental Assessment Categorv finanee surveys studiesB- training and designs.

CNAISARE 85.0 (R) Rainfed Areas Development - The Consulting servie-s will Appraisal report under(Bank) proposed project aims to: (a) finane-' b-e'rquired for project preparation.

rural infrastructure (mainly small-scale implementation.irrigation); (b) support small-scale Retroactive financinr ofprivate sector extensions and (c) assist uP to lOX of loan amountthe institutional development of the is likely to beexecuting agency. Enjirorg tsjl recoomended.Assessment Categor B.

Banco Nacional de 150.0 Railway Sector - To improve efficiency Consulting aervices Appraisal report underObras y Servicios (Bank) through implementation of a far reaching will be required, preparation.Publicos restructuring plan. Project would(BANOBRAS) assist the railways in becoming a Retroactive financing of

commereially oriented and financially up to 0l is likely to beviable organization. Environmental recomnended.Assessment Category B.

ministry of 15.0 Educatlon - Reform of education sector Consulting servlees will Project identificationEducation (IDA) includlng institutional strengthening of be required, under way.

Ministry, and improving quality andefficiency of primary education.Possible support to prlvatization ofsecondary education (yet to be defined).Environmental Assessment Category C

117 -

Ymb r Cowntry, AOmt SImpl_atiD Ptobable Stage of Processim selAgency L'ndr Project Consulting Service Aato an ?roourmdtt

(Cont ' d)

Ministry of 40.0 (R) Economic Recovery II - The project Consultants are being ProJect preparation tude1Finc 0 (IDA) aims at areating the conditions for used for preparation of war-

resumption of sustained growth, project. (Cofirmacin will befocussing on removing barriera to required.)private soctor development. The areaslikely to be included area(a) governancea (b) privatisation ofstate *nterprises, (c) fincial s*ctorraformas (d) labor market reforml and(a) public sector reform. EnviromnentalAssessment Cateaor- U.

Ministry of Bealth 15.0 (R) Health Soctor - Tho project would Consulting services are Approvd by the Zxecutive(MOB) (IDA) include: (a) institutional *xpected to be required Direotors on December 16,

strengthening of M08B (b) strengthening for moat componets of 1993.of maternal and child health care, the project.(c) development of an *fficiont RetXratiVe fInaGine o2 fpharmaceutical supply systems uo to 10 will be(d) rehabilitation and maintenance of recownN40.hospitals and health facilities and(e) technical assistance to the SocialSecurity Institute (INSSBI), princLpallyto help reform and implement its healthinsurance program. En"vronmentalAsessgeent Category C.

Mliistry of Public 60.0 CR) Road Rehabilitation - The projcot Consulting services will Board presentationWorks (Bank) would finance a time-alice of the be required to finalise scheduled for

Government's 1994-1997 road engineering. December 21, 1993.rehabilitation end maintenance program.Environmental Assessment Catesorv B.

Ministry of Health 25.0 (R) Rural HEalth (formerly Nutrition and Consulting services will Appraisal mission LA the(Bank) Environmental Health) - Will support the be required for final field.

ovewrnment's targeted nutritional design and engineering,assistance programs and will improve applied research,access to potable water in rural areas training and projectthrough rehabilitation, upgrading snd administration.expansion of sMall scale water supplyend sanitation systems, in order toimprove the health status of the ruralpopulation. Envlronmental AssessmentCatetor9 C.

tAX

To be determined 50.0 (R) Natural Resources Management II - Need for consultants not Preparation to begin in(Bank) Natural resource management in the, yet determined. Jmne 1994.

eastern region, pilot and titling andpilot environmental measures in Chaco.Environmental Assessment Catecor v ToBe Determined.

Central Bank 50 0 (R) Private Sector Development - Project Funds from Japanese Negotiations tentatively(Bank) seeks to overcome weaknasses and Grant are finencing schedulod for January

constraints in the financial sector, and technical assistance. 1994.provide long term credit for a widerange of final borrowers. EmironmentaAssessment Cateaorv B.

kmaber Country, A-ount &qlepl_tiug Probable stage of Processing and

Agency L"e er 2 Project a Consulting services Action n Pracruldbt

YARAGOAY(Cont'd)

Ministerio de 15.0 Secondary Education Improvment - The Funds from a Japanese Preparation under way.

Educacio y Culto (Bank) project will address the secondary Grant are financing A PPF advance is avaiting

(NBC) education system through institutional technLcal aseistance. ratification by the

strengthening and policy development, Government.

improvements in the quality of secondaryeducation, as well as increases incoverage in targetted low income areas.Environmental Assessment Cate-orv C.

Corporacion de 50.0 (R) Asuncion Sewerage - The project will Consulting services vill Pre-apprAisal mission in

Obras Sanitarias (Bank) improve health and infrastructure bc required for final the field.

(CORPOSANA) serviceas to the low incomn population of design and monitoring of

Asuncion. It vill provide collection water pollution control. Retroactiv_ financing

and adequate sewage disposal servicLe to likely to be included.about 250,000 inhabitants, increasing Amount to be determined.

services from 401 to 60X to the year2010 population. Environment_lAsaessment Category A.

Ministerio de 50.0 (R) Natural Resource Management and Consulting s-rvices vill Board presentation

Agricultura y (Bank) Irrigation Development I - The project be required in tontatively scheduled for

snaderia would create the institutional implementation. February 1994.

structure, generate research rosults,and Support small farmers in Retroactive financtin of

establishing sustainable and diversified up to USSl.0 million is

production systems. Rural roads would included.

be improved nd remaining indigenouscomminities assisted. EnviromentalAssesosmnt Categorv A.

Ministerio de 65.0 (R) Eighth Highway - Road improvements Engineering designs, Board prosentation

Obras Publicas y (Bank) and rehabilitation to decongest access vork supervision, scheduled for

Comunicaciones to, and traffic vithLn and around technical assistance for December 21, 1993.

(MOPC) Asuncion, and to improve accessibility institutionalto ports, also includos institutional development, and staffsupport for MOPC. Environmental training by consultantsAssessment Catesorv B. vill be necessary under

the project.

PERU

Ministry of 150l 0 Irrigation Subsector - The project would Consulting services will Project preparation under

Agriculture (Bank) provide: (a) support to the development be required for way.

of a tradable water rights systemi preparation of (Cofinancing to be(b) rehabilitation of about 25- feasibiltty studies and provided by OECF.)

30 irrigation schemes, estmated to engineering designs forcover about 100,000 has rehabilitation schemes(a) lnstitutional development and that wlll be implementedstrengthening of water users' after the first twoorgenizationt and (d) incentives for years of the projeet.technological innovation, including atraining program and a pilot program toencourage adoption of modern irrigationtechnology. Environmental AssessmentCategory B.

- 119 -

h bzr Country, Armt Implm-ting Probable Stage of ProoesAng andAamS y Lender Project Consulting Servlcos Actiun ae Procurement

(Cont d)

Pondo Nacional de 100.0 (R) Social Investment and Development - Services would include Approved by the Ex cutiveCompensacidn y (Bank) The project would support the National consultants to assist Directors on Decamber 16,Desarrollo Social Fund for Compensation and Social FONCODES in improving 1993.(FONCODES) Development vhich chanels resources to its evaluation,

communities for demand-driven and labor- monitoring and appraisal Retroactive finencins ofintensive projects vith a strong focus procedures. up to USS5O million Ison employment generation, education, proposedhealth, and nutrition. EnvironmentalAssesament Catesory B.

To be determined Up to Municipal Rehabilitation and To be determined. Identification in150.0 Management - Project vill strengthen progress.

institutional and policy reform inselected municipalities, including theomtropolitan region of Lima, and improveservices in selected urban subsactors.Environmental Assessment Category B.

Serviclo de Agua Up to Lime Water Privatization Consulting services vill Project preparation underPotable y 150.0 Rehabilitation - Project seeks to: be required in the areas vay.Alcantarillado de (Bank) (a) modernize the present regulatory of <conomic analysis,Lima framevork and attract private operators environmental

to manage Lima's water servicei and assescment,(b) reduce supply bottlencks resultLng privatization and vaterfrom unreliable and unpredictable resources managemnt.services, and minimize health hazards.Environmental Assessment Catezorv B.

Ministry of Energy Up to Electricity Privatization Adjustment - To b- determined. Negotiations tentativelyand Mines 200o0 Policy, regulatory and institutional scheduled for February

(Bank) reforms, tariff reform, and 1994.privatization of electricity sectorenterprises in generation anddistribution. Environmental AssessmentCategorv B.

To be det-rmined Up to (R) Basic Health end Nutrition - The Consulting services will Board prosentation34.0 project vill protect the poor during be required in the areas scheduled for end January(Bank) economic adjustment, by strengthening of information, 1994.

financing and delivery of targeted education andhealth and nutrition programs. communications,Environmental Assessment Categorv C. community health

training, and healthoperations research.

Ministry of Up to Primary Education - The project will Consulting services will Identification inEducation 100.0 *upport improvements in quality of be required in the areas progress.

(Bank) primary end pre-primary education, of student assessment,Environmental Assessment Category C. managemnt information

systems, and managementof text book provision.

- 120 -

*-ber Country Amount &Inpmting Probabl Stage of Processing ndA4ency Lender Project s Consulting ServLee Actien en Procurment 4

(Cont'd)

Ministry of Up to Transport Rehabilitation - Consulting services Vill Appraisal report underTransport, 150.0 Rehabilitation of highwayst railvays, be required for road preparation.Co4muunications, (Bank) and Lima's airport runway. engineering,Housing and Environmental Assessment Cateaor S. construction suporviaion IBRD PPF advance ofConstruction of roads and airport USS1.5 million has been

runway, development of a approved to finance:national bridge (a) final designs andstrategy, road preparation of tenderadministration and documents forfinance studios, and rehabilitation ofother technical national roads, bicycleassistance. ways in Lima, and railway

facilities; (b) tecbnicalassistanca to Ministry of

Transport,Communications, Housingand Construction, and tonational railvey copany,ENAFU.

TRNIDA &

To be determined 30.0 (R) Export Infrastructure and To be determined. Project has bean removed(Bank) Development - To assist the Government from the currant lending

in establishing an industrial park (at program. FurtherLa Brea) where export-oriented gas-based reporting will beand other manufacturing industries are discontLnued.to be developed by the private sector.The project would be developed in thecontext of policy reforms aimed at:(a) efficient exploitation of naturalgas; and (b) attracting foreigninvestment. The Bank would help financenecessary infrastructure to establishthe estate and related port facilities.Environmental Assessment Category A.

Water and Sewerage 36.0 water and Sewerage Rehabilitation - The To be determined. Appraisal report underAuthority (Bank) project will address emergency preparation.

investments to reduce water losses,replacement of watermains,rehabilitation of pumping stations andground water wells, an unaccounted forwater reduction program and watermetering installation. The projectwould also include technical assistancein the areas of management, accounting,demand planning, and staff training.Environmental Assessment Category S.

To bh determined 11.0 Natural Resource Manacement - To develop To be determined. Project preparation under(Bank) a long-term strategy and institutional way.

capability to manage the nation'sforests, the associated blo-diversitynd the lands within the boundaries of

the gazetted forest reserves.Environmental Assessment Catego2r: Tobe Determined.

- 121 -

Ymber Country, mount &Iaploneting Probable Stage of ProcessSig and

Agency A Lkder 2 Projct Consulting Servicar ActU an PSrcurc nt'

TRUIlM ARD U:

(Cont'd)

To be determined 10.0 (R) Power Sector Reform Technical To be determined. Relevance and Government(Bank) Assistance - To assist the Government in interest in this project

strengthening the legal end regulatory needs to be confirsed inframework to enable efficient light of recentcompetition and private participation developments.including the design and theimplementation of a national program forenergy conservation. EnvironmentalAssessment Cateaorv B.

Water and Sewerage 50.0 Sewerage Rehabilitation end Expansion - To be determined. Preparation under way.Authority (Bank) The project vill include:

(a) rehabilitation of selected swagsetreatment plants. (b) construction of anew sewage traatment plant for theEastern Main Road Cocmunities:(a) construction of new sewagecollection systems and rehabilitation ofexisting ones. Environmental AssessmentCategory B.

Administracion 85.0 Power Transmission and Distribution - To be determined. Pre-appraisal miasionNaeional do Usinas (Bank) Project will include: (a) expansion of program_d for Fobruaryy Trasmisiones the 500 kV transmission substations. 1994.Electricas (UTE) (b) modificaiton of the 150 kV

transmission systems end (c) first phaseof system renovation including change ofmiddle voltage (22 kV) system and lovvoltage (3801220v)t and (d) technicalassistance to help implement theproject. Environmental AssessmentCategory B.

Ministry of Health 20.0 Health Sector Dcvelopment - The project To be determined. Project preparation under(tBnk) would assist the Government in: way.

(a) establishing the policy frameworkfor the overall development andmodornigation of the project, includingthe transfer of selected ancillaryservices and tertiary care facilities tothe private sectorl (b) strengtheningthe capacity of the Ministry of PublicHealth in its normtive and regulatoryroles and (c) rationalizing andextending baaic health services.Environmental Assessment Catesorv C.

Central Bank 35.0 (R) Privato Sector Development - Consultlng services will Board presentation(Bank) Ovorcoming weaknesses and constraints in be required to study the scheduled for January 11.

the financial sector end providing long legal and institutional 1994.term credit for a wide range of fLnal framework forborrowers. Environmental Assessment securitization use ofCalteorv B. guarantees.

- 122 -

Member Country, A eunt aIevn'tiaz Probable St&ge of Processing andAg4 cy 'adr S Project Cocsulting Services Actian oa Procnrement

(Cont'd)

Ministry of 42.0 (R) Irrigation Natural Resource To be deterLned. Board presentationAgriculture, (Bank) Mangaement - Support investment for soil scheduled for January 11,Livestock and and water conservation and other natural 1994.Fisheries resource management measures.

Environmental Assessment Category A. Retroactive financinr ofUp to USS3.0 million isincluded,

To be determined 20.0 Water Supply - Project will finance a To be determined. Identification scheduled(Bank) time-slice of OSE's capital investment for April 1994.

program for wvatr and sewerage inMontevideo and the provinces.Environmental Assessment CategorTy ToBe Determined.

Central Education 31.5 tR) basic Education Quality Improvement Consulting services will Negotiations tentativelyDirecting Council CBank) - Project will: (a) expand the coverage be required in pre- scheduled for February(CODICEN) of and enhance the quality of pre-schools; school education, in- 1994.AdminiLtracion (b) enhance the efficiency, equity and serwice teacherNacional do quality of primary educationi and training, physical Retroactive financins ofEducacion Publica (c) enhance sector productivity and infrastructure, up to USS935.000 is(ANEP) strengthen sectoral management. institutional included.

Environmental Assessment Categorv C. strengthening, andcognitive assessmenttesting buildingcapacity.

To be determined 10.0 Public Administration Reform - Reform To be determined. Project is pending, and(Bank) and modernization of the central subject to ongoing

administration. Evironmental dialogue with theAssessment Category C. Government.

Ministry of 33.0 (R) Public Administration Reform and Consulting services vlll Appraisal report underDecentralization (Dank) Decentralization - The project vill be required, preparation. Post

restructure and strengthen public appraisal missioninstitutions responible for providing scheduled for April 1994.those core govarnment functions whichconstrain the development ofinstitutional capacity in the deliveryof public servlces by both the CentralGovernment and state governments.Environmental Assessment Category C.

To be determined Up to Monagas State Water - The project would To be determined. Preparation under way.30.0 strengthen state and/or municipal level(Bank) water companies in selected provinces,

and help establish a vell-functioninginstitutional framework for sectorregulation. Environmental AssessmentCatenorv B.

- 123 -

NMb_r CMtmry, mmt Implamentig Probible Stage of Proes-ing andA4gec Lader 2 Project Consulting Services Action on Procurmmt'

118ZI(Cont'd)

To be determined 40.0 Judicial Infrastructure Development - To To be determined. Approved by the Executive(Bank) strengthen judicial institutions to Directors on August 6,

provide a legal system conducive to 1992. Date of loanprivate sector development, stgning to be determined.Environmental Assessment CatezorY: ToBe Determined.

Ministry of 89.4 Basic Education - Improve quality of Consulting services will Approved by the ExecutiveEducation (MOE) (Bank) basic education, and support for the be required in the areas Directors on November 4,

decentralization of education to of student assessment, 1993.increase accountability at all levels organizational analysis/and to improve the capacity of the decentralization, andMinistry of Education to implement development ofeducational reforms. Environmental management informationAssessment Catescrv C. systems

Instituto Nacional 55.0 National Parks Management - Aasist the Consulting services will Approved by the Executivede Parques (Bank) Government in liplementing the national be required for Directors on December 8S

systems of parks, to strengthen institutional 1992. Loan signinginstitutional capacity of INPARQUESJ strengthening, pending officialMADRR for environmental education decentralization, and confirmation fromprograms and lnvolve the local management of national Government that it iscommunities in the preparation and parks. ready to sign the loan.implementation of management plans forparks and other conservation units.Environmental Assessment Category C.

Funcscion Pars la Up to Agricultural Extens3ion - Establish nev To be determined. Appraisal missionCapacitacion a 60.0 decentralized public agricultural scheduled for March 1994.Investigacion (Bank) extension system for small and medium-Aplicade a Is sized farms. Environmental AssessmentReforma Agrarian Catteory C.(CIARA) Ministryof Agriculture endLivestockProduction

Mlnistry of 150.0 (R) Highway Management - Supports Consulting services will Approved by the ExecutiveTransport and (Bank) institutional reforms aimed at gradually be required for Directors on December 22,Telecommunications decentralizing responsibilities for *ngineering, 1992. Loan expected to

highways and would finance a time-slice construction supervision be signed end Decemberof the rehabilitation program for the and technical 1993.sector in the 1993-97 period, assistance.Environmental Assessment Categorv S. Retroactive financiag

would be considered up to10X of the loan amount tohelp start imolementationof Prolect components.

Fondo Nacional do Up to (R) Urban Transport I - Strengthening of Consulting services Approved by the ExecutiveTransports Urbano 100.0 the urban transport sector institutional required in the area of Directors on November 4,(PONTUR) (Bank) framework, financing mechanisms and trafftc management and 1993. Date of loan

local coordination. Infrastructure and control, transport signing to be determined.traffic managmnt investments in six planning and urbanmunicipalities and the Caracas transport economics.metropolitan region. EnvironmentalAs3essment Category D.

- 124 -

UAmber Coontry, Amount &isp1im_ntin Probable Stage of Proaedssig andAgency Leader 1 Project $ Consulting Servics Action on Procurmnt'

rmSL(Cont'd)

Yundacion Gran 58.0 (k) Student Loan Reform - Will support Consulting serviess will Approved by th ExecutiveKariscal de (Bank) student loans mainly for graduate be required for Directors on June 23,Ayacucho, studies in specialized flelds of study. placemat sad mnagement 1992. Date of loanFundacion Eacuela Environmental Assessment Cateeorv C. of ov.rseas graduate signing tentativelyde Cerencia students, technical scheduled for JanuarySocial) assistance and training. 1994.

Ministry up to Irrigation Subsector - Proj-et will To be determined. Preparation under way.Agriculture and 125 0 include: policy reforms completion ofLivestock, and (Benk) irrigation schemes wlth majorMinistry of infrastructures and support for privateEnvironment and sector irrigatlon development.Renevable Environmental Assessment Catexorv B.Resources

To be determined Up to Power Sector Investment I - Would Consulting services for Project preparation under200.0 support a program for institutional thermal repowering, and way.(Bank) technical and financial rehabilitation distribution loss

of the power sector, and would consist reduction program haveof: (a) rehabilitation and repowering been appointed.of gas thermal power plants Consulting servie-s will(b) reduction of technical and non- be required fortechnical lossess (a) construction of technical assistancetransmission lines and sub-stations, and training.td) technical assistance and training.Environmental Assessment Category B.

Ministry of Health 94.0 (R) Endemic Disease Control - Would Consulting servie-s wlll Approved by the kxecutive(Bank) strengthen public endemic disease be required in desLgn of Directors on December 8,

control programs and *pldemiological information system and 1992. Loan signingsurveillance. Environmental Assessment computerized exp eted by end DecemberCategorv S. epidemiological mapping. 1993.

Ministerlo del Up to Caracas Water Rohabilitation and - To be determined. Preparation under way.Ambiente y los 100.0 Privatization - Rehabilitation ofRecursos Naturales (Bank) existing watar supply facilities andRanovables (HARMR) support of the privatization of the

Caracas water system operation.Environmental Assessment Catetory B.

Ministry of Health Up to Hospital Modernization - Investment in Consulting services will Appraisal report under66.9 modernization of management, be required in design of preparation.(Bank) infrastructure end equipment for a hospital cost

hospitals and their referral networks accounting system,Also vith policy changes to improv. hospital information*fficiency and quality of health cae. systems, organizationalEnvironmental Assessment Categor-y . change, hospital

maintenance, materialsmanagement,architectural plans forinfrastructurerehabilitation, hospital-anagement training,decentralized planningof health services, andhealth care finance.

- 125 -

Member Country, Amount &Inpl-emnting Probabl- Stage of Procesing endAgency - LJnder t Project I Consulting Services Action on ProcuroeMet 4

V. IDDLE EAST AND BMWH AJRICA ECI

Agence Nationale 30.0 (N) Emergency Desert Locust Control - Need for consultants not Board presentationde la Conservation (Bank) Proj-et vill provide urgent assistance yet determined. scheduled fordo la Nature (ANN) in support of the national locust Dsaember 23, 1993.

control program. Project vill furtherreinfore the existing Surveillance andvarning systems, enabling the country tobetter predict locust activity endmovements. The project will econsist ofthree locust control campaigns, using1.5 million liters of pesticides andcoemercial aircraft spraying servie-s.Will also include provision of vehicles,equipment training, and short-termeonsultancy. Environmental AssessmentC^&vtory D.

Ministry of 50.0 (N) Agricultural Services - The project Need for consultants not Project is at SEP stage.Agriculture (Bank) aims to promote private sector yet determined. Date of preliminary

development in agricultural services mission to start projectthrough Lnvestmet, foreign exchange for preparation ndimports, and technical assistance identification is to berEnvironmental Assessment Category B. determined.

Government of 150.0 Housins Infrastructure - Project Naed for consultants not Project underAlgeria, Ministry (Bank) components incLude: (a) trunk yet determined, preparation.of Rousing infrastrueture for urban expansion areas

in the four major cities! Algiers, OrenConstantine, and Annaba. areas in whichGovernment land would be auctioned toprivate developersl (b) eonstructionmaterial imports to meet the demandinduced by the projects and(e) technical assistance to improve theland market operational environment endinfrastructure cost recovery.Environmental Assessment Catemorv B.

Ministry of Health 75.0 (R) Health end Family Planning - Proj-et Need for eonsultants not Project is not yet(Bank) will provide support for strengthening yet determined, identified.

basic health serviees includingimprovement of family planning services.Environmental Assessment Category- ToBe Determined.

Ministere de 150.0 (R) Water Supply end Sewerage Consulting services will Negotiations scheduled1'Equipment (Bank) Rehabilitation - The project would seek be required to advise on for early January 1994.

to restructure the urban water supply proposed chng as insector with a view to establishing policies, sectorinstitutionally, financially autonomous, organization, andwaterlsewerage utilities. It will administrativeentail the participation of the private procedures.sector in leak detection and repairo.The Bank loan would be disbursed for thepurchase of equipment and materials, asthe proposed actions are beingimplemented. Environmental AssessmentCategory B.

- 126 -

member Country. Amomt &I pl-2emtint Probable stage of Processin andAgency' Lender 8 Project Consulting Services Action on Proeuremnt 4

(Coat d)

Ministry of 50.0 Vocational TrainingiEmployment - To be determined. Preparation on hold.Vocational (Bank) Devolopment of esployment informationTraining services and middle end higher lIvel

vocational training and retrainingcapacity. Environmental AssessmentCategory: To Bs Determined.

Ministry of 0.0 Irrigation Management Support (IMSP) - Consulting services will Preparation engoing.A4ricultut- (Bank) Project would support infrastructure bc required.

rehabilitation and iLntitutionalstrengthening of regional authoritiesOffice don P-rimetres Irrigues (OPI)responsible for operating axisting largoscale irrigation system. EnvironmentalAssessment Catesory b.

Secretariat dlZtat 30.0 (R) Toxic Waste - Provides technical Preparatory consultant IEPS meting took placea Ia Recoerche (Bank) sasistane to strengthen the study was completed July November 8, 1993.Scientifique at a institutional framevork for 1993. Preparation of missionl Invironnement enwirorenental managemnt, nd assistance tentatively scheduled for

to industry for temporary storage of January 1994.hasardous vastes and surveillancesystems. Will also assist Governmentvith establisbment of water resourcemanagement system and water pollutioasurveillance. Environmental AssessmentCaetor C.

Ministry of - 155.0 Highways Vt - Projoct vill improv Consulting services vill Feasibility studies areEquipment (Sank) condition of the road network plus be required for in progress. Pre-

streamlining of procedures and vork site supervision of works, appraisal nissioninput delivery system proven deficlent. and institutional scheduled for JanuaryWiLl also sharpen Governments policy to development of the 1994.develop motorways across green lend motorvay mavagteentarxea through design and construction of xystems. Consultinga 22 km section vest of Algiers. The servieos vill also bemotorvay compon nt implies that a 3 km required for developingtunnel and extensivo ground lovelling systems of munitipalvlll be required. EDv&romentsl road maintananc4 roadAssessment Categorv A. safety institutions, and

training of road staff.

Ministry of 100.0 Urban Transport Enterprise - Expansion Consultant cont*act has Project underTranwport, (benk) of the provisLon of bus services in main been signed. preparation. FYialDirection des Algerian cities, through the: esibllty reportTransports Urbains <a) rationalisation of enterprises expected end 1994.

operating and management practices;(b) rehabilltation of existing busfleets and cquisition of new busos, and(a) training and technLcal assistancefor enterprise operations and financlalmanag ment, and for the preparation oftraffic management studies. The nrolectis foreseen to have a nositive imact onthe *nvironment, mostly as a result ofreduced ensine emissions arisins fromimrovd4 operation and mainten nc ofthe bus filets. Further measures tomitliate vehicle pollution, includinafuel substitution, would be vursuedthrouth a study. EnvironmentalAsessgMnt Category B.

- 127 -

Mebobr Country. Amount &Implenting Probable St-g of Processing andAgency ' Lender 2 Project ' Consulting Services Action on Procurement'

FTPT. APR C Qi

River Transport 70.0 (N) Demietta-Cairo Inland Waterway - Consulting services will Projoct underAuthority (RTA) (Bank) Project vill tnclude the following be required for preparation.

components (a) dredging end channel supervision andtraining works to provide year round toehnical Assistence.navigation with minimum channel depth of2.30mi (b) navigation atds -- mainlyateel buoys and concrete anchor blocks,(c) two, new reinforced concretenavigation locks at Dclt- BDrrage andZifta; (d) new, reinforced concretenavigation lock adjustable weir at ElHansoural (o) hydraulic structures andmechanicalielectrical equipment for allnew locks; and (f) technical asaistancoand studies for Ci) trade facilitation,(ii) institutional strengthening andestablishment of a managementinformation system at RTA, and(iii) private sector development.Environmental Assessment Catesorv A.

Principal Bank for About (R) A4ricultural Modernization - To Consulting servicoes vill Appraisal report underDevelopment and 67.0 support promotion of improved technology be required for agro- preparation.Agricultural (Oank)/ packages, including selective industries andCredit About mechanization of production and environmental guidance.

67.0 processing. Environmental Assessment(IDA) Catesory B.

The Government and About (R) Belwan Industrial Pollution Consulting services will Negotiations tentativelyEylvan, Tourah and 50.0 Control - The project aims to reduce be required for: scheduled for PebruaryNational Cement (Bank) pollution levels in the industrial area (a) management contracts 1994.Companies 50.0 of Belvan. The project wtll: (with firms in operating (CCof.nencing expected

(IDA) (a) establish lc¢al monLtoring, and marnaging cement from the Germaninspection and enforcement capacity; companies) Gcvornmont. DANIDA(b) prepare a Helwan Environmental (b) environmental audits 'financing is underAction Plan for future financing; and and pro-feasibility j considor-ation.)(c) reduce cement pollution to studiosa endinternationally acceptable levels by tc) training local staff Retroactive finanoins lnimplementing an integrated package of in environmental the nummt ofmeasures. Total project cost is monitoring. USS5.0 million isUS$241.0 million. Environmental naia**A.Assessment Category B.

Asad University 150.0 (R) Private Higher Education Development Need for consultants not Project preparation under(Bank) - Quality improvement of higher yet determined. way. Pro-appraisal

education through improvements in mission scheduled forplanning m-nageament and financing Jcnuaryllebruary 1994.systems, faculty development, libraryservices, and pedagogical equipment inthe Azad University private highereducation system. EnvironmentalAssessment Catezory C

- 128 -

Member Country, Amount &loplmmenting Probable Stage of Processing andAgency Lander Project I Consulting Services Action on Procuement 4

(Cont 'd)

Ministry of .ihad 170.0 (R) Rangelands end Livestock Development Consulting services Will Negotiations tentativelySazandegi (Bank) - To support pollcies and strategies for be required for scheduled for January

rehabilitating rangelands, asiisting livistock production, 1994.nomadic peoples and improving ruminant extension, livestockproductivity, together with industri-s end fisheriesstrengthening associated support development.services, and executing strategy studiesfor associated agro-industrios andfishers sub-sectors. Envrro=nentalAssessment Catesor B.

TShran Provlne- 100 0 (R) Tehran Sewerag< - The project will ConsultLng services will Project preparation underWater end Sewerage (Bank) consist of: (a) a supply of 3140 kma of be required for way.Company pLpes in sizes from 150 to 2400 mm engineering, (Cofinancing will be

(b) laying of pipes including construction required.)appurtenancest (c) construction of supervision, projecttunnels (2000 to 3000 m) to a length of managemnt,20 kms; (d) construction of a 4 km long organizationalculverts and (a) construction of sowage development andtreatment works with supply and subsequent phaseinstallation of equipment, extension.Environmental Assessment Category A

Ministry of 125.0 (R) Basic Education Quality Consulting servioes Appraisal missionEducation (IBED) Improvement - The project would improve needed in ares of eompleted. Appraisal

access end quality of elementary and Educational management report under preparation.guidance education notably in 8 focus and quality and teacherprovinces (selected on the basis of training.poverty indicators). It would providecivil vorks, materials, *equipment,fellowships and technical assistance.Environmental Assessment Catecory C.

Miniatry of 50.0 (R) human Resources Development Sector Consulting zervices vill Preparation missLon is inZducation, (lank) Investment II (HRDSIL II) - This p-oject be requird in the the field. AppraisalNational Center will eontinue to support the preparation of this mission scheduled forfor Educational Government's ten year education reform project. October 15, 1994.Research and program. The main objective of the (Cofinancing isDevelopment reform is to improve the quality of expected.)

education, through changes in sectorpollcy and institutional developmentinitiative. Total project cost isUS$150.0 million. EnvironmentalAssessment Catesgor C.

Hinistry of About (R) Telecommunications - The project Consulting services will Project preparation underPlanning/ 20.0 woul4 provide support for sector likely be required for way. Appraisal reportTelecommunications (Bank) restructuring to enhance sector sector restructuring and under preparation.Corporation efficiency through come rcialization, project implementation.

greater competition, and private sectorparticipation. It would also assist inmobilizing resources for thetelecoomunications investment program.Environmental Assessment Categoryc ToBe Determined.

- 129 -

Member Country, Amount Implemnting Probable Stage of Processing and

Agency Lender ' Project Consulting Services Action on Procurement 4

(Cont'd)

Ministry of About (R) Agriculture Sector Technical Consulting services vill Preparation report

Agriculture 10.0 Assistance (ASTAP) - Project will likely be required for: received from FAOICP.

(Bank) provide technical assistence and (a) setting up an export Pro-appraisal mission islogistical support to agricultural agencyl (b) improving in the field.development in complment to policy quality controlsadjustments under the Agriculture Sector (c) integrated pestAdjustment Project. Environmental managementt end (d) aAssessment Catesory C. series of studies on

water management, ruralfinance andcooperatives.

Ministry of 60.0 (R) Agriculture Sector Adjustment (ASAL) Consulting services vill Project preparation underPlanning (Bank) - Balance of payments loan in support of not be required. way. Pre-appraisal

adjustment measures to improve mLssion is in the field.

productivity and eport potential in theagriculture sector. EnvironmentalAssessment Catetory C.

Ministry of 80.0 (R) Energy Sector Adjustment (ESAL) - Consulting services Approved by the ExecutivePlanning (Bank) The project vould support policy and retained for an Director. on October 7,

institutional reforms to: institutional and 1993. Loan was slgned on(a) rationalias enargy pricing# financial restructuring November 24, 1993.

(b) restructure and comnercialitse nergy study financed through asector instituttons, (c) develop en Japanese grant.efficient regulatory framework; and(d) improve environmental protection inenergy operations, and (a) improveenergy conservation. EnvironmentalAssessment Catesory U.

Ministry of Health 30.0 (N) Ibalth Services Rehabilitation - The Consulting services will Project identification

(Bank) project would aim at improving the be required for project completed. Projectnational system for health care delivery preparation and preparation1pre-appraiealwhile strengthening the institutional implementation. mission is in the field.capacity of the Ministry of Health (Cofinancing expected.)

(MOB). Project would focus on therehabilitation of selected healthcenters, general hospitals (used forfront-line referral servLces), apreventative program, end storage anddistribution facilities for essentialmedical supplies. EnvironmentalAss-ssment Categorv C.

To be determined 8.0 (R) Technical Assistance For Consulting services will Appraisal completed.

(Bank) Administrative Rehabilttation - The be required for: Negotiations tentativelyobjective of the project Is to improve (a) customs, taxes, scheduled for Januarythe efficiency of economic management statistics and budget 1994.and public administration. administrations and

Environmental Assessment Category C. civil service and publicadministration.

- 130 -

Member Country, Amount tImplementlng Probable Stage of Processing andAgency ' Lender Project Consulting Services Action on Procurement 4

Ministry of Health 40.0 Health Mhanagement - Project would Need for consultants not Project under(Bank) support. (a) implementation of nov yet determined, preparation.

financing mechanisms, mainly healthinsurances (b) hospital managementreforms. and (c) prlorlty rehabilitationof health lnfrastructur. EnvisonmentalAssessment Catesory- To Be Determined.

To be determined 120.0 (R) Private Sector Development - Support Consulting servLcas may Appraixal mission(Bank) for the implementation of policies and be required. departure scheduled for

strengthening of institutions to foster May 299i.private sector development, includinginter alia financial and capitalmarkets, tax instruments, external tradepolicy, administrative and legalprocedures relating to businessoperations and business associations, aswell as a possLble line of credit orother facilities to provide financingfor prLvate entrepreneurs.Environmental Assessment Category C.

To be determined 150.0 Social Priorities I - Project will be To be determined. IEPS issued and(Bank) used to support: (a) implementation of preparation ongoing

the Social Action Program (defined underSAL 1); (b) address systematic issuesand cross-sectoral constraints in thepublic management of human resource andsocial sectorst and (c) improvement ofthe provision of basic social servicesto disadvantaged groups. EnvironmentalAssessment Categorv C.

Sous-secretariat 5.5 Environment Technical Assistance - Consulting services will Approved by the Executive

d'Etat aupres du (Bank) Project will include: (a) strengthening be required. Directors onMinistere de the institutional legal and policy September 14, 1993.I'Interieur fratmwork for environmental management;

and (b) providing technical assistancefor the implementation of speclfic pilotprojects to improve the environmentalmanagment. Environmental AssessmentCateSory B.

Direction des 100.0 (R) Secondary Tertiary and Rural Roads - Consulting servlces will Post appraisal mission

Routes et de la (Bank) The project would; (a) strengthen be required. completed December 4,Circulation institutions ln charge of road 1993.Routlere (DRCR) maintenance, road funding and network

management; (b) improve access to ruralareass (c) reduce the maintenancebacklog and widen sub-standardpavements, and (d) improve safety.Environmental Assessment Category D.

MLaistry of About Rural Poverty Reduction and Envlronment Consulting servLces are Project preparation under

Interior, 30.0 Protection - The project would provide requlred for project way and IEPS approved.Direction Generale (Bank) for economic opportunities and social preparation, indes CollectivLtes services to the rural poor, in particular to enhanceLocales particular in mountain areas, while at institutional capaclty

the same time protecting the and to preparebiodiversity environment. Also, implementation plan.construction of a rural road accessnetwork as a key condltion for Banksupport. Environmental AssessmentCatetory B.

- 131 -

MWeber Country, Amount oImpLementing Probable Stige of Processing tnA4Acy 'Lende r Project Consulting Services Action an Procurement

(Cont 4)

Minletry of 35.0 (R) Irrigated Areas - AgricuLtural To be determined. Negotiation. corpleted.Agrieultur and aBank) Services - Project would provide funding Board pr-sentationAgrarian Reform for: (a) strengthbning extension scheduled for(MARA) services of the regional irrigation Deeembir 21, 1993.

authorities (ORMVA) and promote theparticipation of farmers' organizationsand the private sector in thedevelopment and dissemination ofimproved technology; (b) an appliedresearch program, (c) staff and farmertraining; (d) complementary investmentsto extend soil testing and developappropriate mechanization;(e) establishment of a monitorinSsystems and (f) studies. EnvironmentalAssessment Catezorv B.

MinLstry of 140.0 Second Agriculture Sector Investment To be determined. Green cover staffAgriLculture and (Bank) (ASIL 1I) - Loan is in support of a appraisal report avaitingAgrarian Reform time-slice of Morocco's investment audit certification, and(MARA) program in agriculture. It would also ready for distribution.

promote further sector policy andinstitutional reforms. EnvironmentalAssessment Catesory B.

MinLstry of 75.0 National Watershed Management - To To be determined. An FAO identificationAgriculture and CBank) Improve land use and natural resources misaian has beenA4rarian Reform management in mountain areas and reduce completed and report

*iltation in reservoirs and associated prepared. FAObydraulic infrastructure. Main preparation missioncomponents would include- expected by end January(a) institutional and organizational 1994.developments Cb) improvemnt of legalframework for land use in mountainareast tc) investments in selectedwatersheds;t d) applied and adaptiveresearch and extension; and(e) technical assistance and training.Environmental Assessment Cateeorv C.

Credit Imobiler 100.0 Social Rousing I - Project aims to: To be determined. Preparation has begun.Hotelier (CIE) and (Bank) Ca) upgrade housing conditions to lowCommercial Banks income householdso (b) reduce housing(To be determined) costs and contain the cost of urban

growth mainly by improving the operationof land markets; and (c) encouragecommercial banks to participate inmortgage lending in the context of thereform of the financial sector.Environmental Assessment Category: ToBe Determined.

cNCA 100.0 tR) National Rural Finance - Project Consultant services are Board presentation

(Bank) will provide line of credtt and required in WID scheduled forassistance to Credit Agricole of Morocco activities, banking Dee mber 23, 1993.(CNCA) to. (a) develop the sustainable tratning, institutionalfoundations of a high quality and building, and cropcompetitive intermediary within a insurance.progressively liberalized financialsystem in the country, and (b) supportrural and other investments by theprivate sector. EnvironmentalAssessment Category: To Be Determined.

- 132 -

Hember Country, Amount CImplementing Probable Stage of Processing andAgency Lender I Project 3 Consulting Services Action on Procurement 4

(Cont'd)

Office National de 160.0 (R) Fifth Water Supply - Rohabilitation Consulting servlces will Approved by th Executivel'Eau Potabla (Bank) of Regies to achieve full sustainabillity be required for final Directors on November 23,(ONEP) Resgis, and and reinforeement extension works, design, bidding 1993. Loan was signed onGovernment social connectLons studies, technical documents, bid December 3, 1993.

assistance and training. Improvemeat of evaluation workshydrologic and meteorologic data supervLsion and punctualgathering and analysis, and a sanitary technical assistaneo.education campaign and pilot rural waterupply projcot. lWironmental

Assessment Categorv B.

Office National 80.0 (R) Fourth Severage - Expansion of Feasibility study Project underAssainissement (Bank) sewerage systems, including treatment in ongoing. Final studies preparation. Appraisal(ONAS) Soumso, Sfax, Kairouan and Milka. to be carried out in mission scheduled for

Strengthening of institutional asp-ets 1994. December 1994.of OKAS Pilot treatment plant usingLEMSA (lentilles d'eau - French forduckweed-based wastewater treatmentprocess) and other systems.Environmental Assessment Catetorv D.

SONEDEIONAS 50.0 (R) Water Supply VIII - The project will Consulting services will Appraisal mission is in(Bank) provide rehabilitation and expansion of be required for final the field.

the water supply system in Greater Tunis design of the projectand: (a) expansion of the rural water and studies.supply system; (b) expansion ofChoulrana sewerage treatment plant andconstruction of four other medium-slzedsewerage treatment plantsa and (e) ademand management program, institutionaland financial strengthening of water andsewerage utilities. EnvironmentalAssessment Cateaorv 3.

Ministry of 25.0 (R) Employment and Training II - The To be determined. Reconnaissance missionVocational (Bank) objectives of the project are; (a) to scheduled for March 1994.Training increase labor insertion through more

effective training and labor marketintermediations and (b) to improve skilllevel of labor force by promoting in-company training activities and privatetraining intermediaries. EnvironmantalAssessment Category: To Be Determined.

MLnlatry of 70.0 (R) Secondary Education Support Consulting services will Pro-appraisal scheduledEducation and (Bank) (formerly Education Sector II) - be required for for February 1994.Sciences Improvement of access and quality in management informatLon

general secondary and basic *ducation systems, assessment of(grades 7 through 13). Project would learning outcomes,also provide civil works (school teacher training, andconstruction and maintenance), podagogic school maintensnce.equipment, fellowships and technicalassistance. Environmental AssessmentCatetory C.

- 133 -

Member Country, mount -Ispl- Lnting Pr 2able Stage of Processing and,4g ncy ' Lender ' Pro3ect ' Consulting Services Action on Procuremont

(Cont 'd)

Ministry of 120.0 (R) Agriculturgl Sector Investment Consulting cervies wtll Approved by the ExecutiveAgriLulture (Bank) (ASIL) - 'ould support public be requiret £or reviev Dirlctoro on ove xber 18t

investments and policy reforms in key of dam safety, 1993. Loan signingareas ineluding; (a) irrigation end organizational planning, tentatively scheduled forwater uw *fficiencyo (b) natural and analyses of Deeember 1993/Jauaryresoure-s; (c) livestock hoalth end irrigtion tariffs end 1994productions (d) fisheries; and (e) land wator use.tenur. Enviro3y4ent-l AssessmentCtegory B.

Ministry of 70.0 Second Forestry Development - Project Consulting ServiCes wil1 Approved by the ExgeutiveAgreiulture (Batik) vould improve quality and quantity of b required for Diretors on May l1

wood produetion, rduce soil erosion and technical assistanco in 1993. Date of loanpresorve wildlife through: (a) forest forestry research, signing tentativelyma ageenta (b) forest plantation; management and range scheduled for December(e) pilot forestry projects; (d) forest development. 1993/January 1994.pasture and range improvements

(-) nature conservation and developmentof Icbukul Park; and (f) Institutionaldevelopment. Environmental AssessmentCategory S.

MLnictry of 2S.0 (R) Northwest Mountainous Areas Consulting services Board presentationAgriculture (Dank) Development - The main objectives would will be required. scheduled for

be to improve the living conditions of December 23, 1993.

the rural popultion, and reduce naturalresource degradation in the northwestregion. The project would support:(a) on farm development, (b) soilconservation; (c) micro-enterprisedevelopMento (d) basic Infrastructure;and (e) inatitutional development.Envtronmental Assesoment Category S.

Ministers de 100.0 (R) National Plood Protection - The Consultants' started Study phase vill take1' quipment et de (Blek) project would have the following working November 1993. about 18 months.1'8abitat objectives; (a) developing a national

strategy for flood control andprotection; (b) minimizing flood damagesby thb construction of appropriateinfrstructurea improving flood controloperations and maintenance, endImproving cost recovery. EnvironmentalAsseswment Category B.

Minister. de 112.0 Integrated Water Resources Development - Consultants will be Preparation under way.l'Equipment et de (Dank) The project would promote en integrated required for technicall'bbitst, development nd management of surface assistance in water

water, groundwater, and wastewater in managementfilling the demand for urban supply endirrigation. It would include physicalwork. for water storage, wastewatertreatment and reuse, rehabilitation andnsta-llation of mte-rs, studies andtechnical assistance. EnvironntalA*sessment Calteory A.

Participating 120.0 (R) Private Inwstment - Provide long Consulting services will Negotiations completed.lAnk and the (lank) term financing to private enterprises be required for Approved by the ExecutiveCowernment of through financial intermediaries meeting technical asistance to Directors on Deember 9,

?uniaia eligibility criteria. EniEgnmantal banks. 1993.

Assessment Category S.

- 134 -

Member Country, Amout 1Implemnting Probabla Stage of Proeassing andAgency Lender 2 Project ' Consulting Services Action on Procurement 4

(Cont'd)

National Bank for 65.0 (R) Rural Finance Reform - The project Consultants required for Pre-appraisal missionAgriaulture (BRA) (Bank) supports development of instLtutional training, institutLon returned from the fieldand other banks capability of BNA and diversification of building end financial on Docember 11, 1993.

credit operations into prlvate rural restructuring of BNA and Appraisal missonnon-farm and export promotion WID. tentatively scheduled foractivLties. Total project cost is AprillMay 1994.US$80.0 million. Environmental (Cofinanoing from EredltAssessment Cateaorv B. Anstalt fur Wiaderaufbau

(KfW) and CaisseFrancaise DaveloppeaMnt(CFD) possible.)

Retroactive financina ofup to lOX Is nlanned.

Ministers de 120.0 Rural Roads - Improvement, Consultants required for Project preparation underl'Equipse nt at do (Bank) rehabilitation and maintenance of technical assistance and way.l'Habitat priority sections of rural roads, implementation.

Environmental Assessment Catesory B.

Ninisteres des 150.0 Transport Sector - Project would3 Consultants required for Further preparationTransports and de (Bank) (a) increase productivity and promote sub-sectoral expertise awvating Governmentl'Equip-ment/ modernization and rehabilitation in and technical assistance decision.l'Eabitat railvays, ports and airports, and to Ministry of

(b) improve road transport organization Transport'through deregulation, road safetymeasures, and road user chargeadjustments. Environmental AssessmentCat.aorv B.

low. RMunC w

Ministry of 25.0 (R) Education Sector Investment - Consulting serviees vill Appraisal missionEducation (IDA) Project will include: (a) enhancement be required for completed in October

of the learning achievements of instLtutional 1993. Negotiationsstudentsa (b) improvement in the access development and tentatively scheduled forof girls to secondary education; and operational and planning December 20, 1993.(e) establishment of coomerce and support for theindustrial oriented subjects. Total secondary as well asproject cost is US$30.0 million, post secondaryEnvironmental Assessment Category C. component.

National Water end To be Sana' Sewerage end Sevage Disposal - Consultant selection Project underSanitation Deter- Extenslon of sevage collection and trunk under way. Consulting preparation.Authority mined main systems, provision of primary and services, including

secondary treatment works, and funding under an IDA PPFstrengthening the National Water and advance, have beenSanitation Authority (NWSA). approved by the Bank'sEnvirornental Assessment CatexorY B. management but not yet

by the Covernment to:(a) prepare final designand bidding documents;(b) update Sana'aseverage system masterplan, (e) prepare anenvironmentalassessment; and(d) formulate a sectorstrategy.

- 135 -

Member Country, Amount IIZploenting Probable Stage of Procesing andAgency ' Lender 2 Project ' Consulting Servtces Action n Procarement 4

10l-a UXQU3L! q(Cent'd)

Ministry of 35.0 (R) Safir - Eadramout Road - Consulting services will Project preparation uAe^rConstruction (IDA) Construction of a 311 km road to provide be required for way-

a direct link between Ssaa - and the construction (Cofinancing *xpetedEadr.mout Valley via GhuvayrSban and the supervision, end to from Arab fund end OPECtowns of Al Abr and Havreh, and provide technical Fund.)provision of basic facilities to provide assistnce.comzunity services alongside the roadalignment. Technical assistance wouldalso be provided for: (a) unifying andimproving transport policies andregulations which predate unification ofthe country in 1990; (b) establishing animproved road pavement anan-gemntsystemi and (a) institutionalstrengthening of the General Corporationfor Roads and Bridges. EnvironmontalAssessment Catesory A.

Ministry of 15.0 Livestock Development - Increasing To be determined. Preparation under way.Agriculture and (IDA) productivity of indigenous livestockWater Resources through broad actions to improve quality

and output centered ont (a) rosearchand development of appropriatesustainable livestock developmenttsehnology, (b) developing extension andveterinary services; (c) testingalternative interventions in indigenousrangelend management systms nd smallfarmers and rural wcen's credit groups.Environmental Asasesment Cate-ory B.

National Water end About Tait Water Supply and Sewerage Ssatem Conaulting servicsa will Project prepr-ation underSanitation 30.0 Rehabilitation and Reinforcement - be required for detailed way.Autbarity (IDA) Rehabilitation end reinforcement of the engineering and tender

vwter and sewerage utility, NWSA, and documnts, construction,water production end distribution supervision, techni-oalfacilities end extension of water assistance and trainLns.distributiou network sad sewerage systemto improve water supply and sewerageservices in Taiz. EnvironmentalAssesament Cateaorg B.

- 136 -

Member Cautry, Amount tIsplementing Probable stage of Processiag andAgenCy' Lander ' Pro3ect I Consulting Services Action on Procurement 4

VI. SOUT ASIA US!O

To be determined 41 4 (R) Cyclone Shelter - Project is Consulting serviees will Final report of UNDP-(IDA) tentatively expected to include: be required. financed cyclone shelter

(-) construction of multipurpose cyclone master plen received endshelter-cum-school buildings, (b) repair September 1993. Projectof existing eyclina shelters; preparation under wvy.Cc) construction of complementaryphysical infrastructure (such as feederroAds) to facilitate the functioning 4fthe shelters for Cyclone evacuation andrelief i d) improvements in cyclonewarnings end dlsaster relief systemsand (a) support for cowmunitylNCOinvolvement in operation of shelterservices and disaster preparedness.Environmental Assessment Catezorv B.

Ministry of Health 50.0 Intersectoral Population - The project To be determined. Project preparation underand Family Welfare (IDA) would include: (a) selected vay.

intersJctoral interventLons to helpreduce fertility, Cb) information,education and communication eampaigns,Cc) research for policy and programdevelopment; and (d) national capacitybuilding. Environmental AssessmentCategorv C.

Bangladesh Bank 25.5 (R) Private Sector Industrial - This Technical assistance Approved by the Executive(IDA) project provides the proceeds of IDA ($500,000) to the Directors on March 17,

funds to participating credit Government s Department 1992. Credit was signedLnstitutLons for landlng to private of Environment vill be on April 27, 1993.borrowers for industrial lnvestment, provided to:Technical assLstance for the Department (a) develop guidelinesof Envlronment is also included. and standardsEavironmental category will be based on (b) document and promotesuboroject agoraisals. Environmental best practices,Assessment Category: To Be Determined. (c) study feasibility of

an industrial wastepermit systems and(d) procure and usemonitoring equipment.

Ministry of Jute 175.0 (R) Jute Sector Adjustment - Restructure Consulting services vill Negotiations are expected(IDA) jute manufacturing industry by be required for to be completed by end

downsizing capacity, retrenching excess privatization and December 1993.labor, closing uneconomical mills, training.Lproaing management, privatization andfinancial restructuring. EnvironmentalAssessment Catetory C.

- 137 -

Member Country, Amount &Implementing Probable Stage of Processing andAgency I Lender I ProJect ConsultLng Services Action on Procurement

(Conttd)

Ministry of Health 65.0 Nutrition - Strengthening of Government To be determined. Appraisal missionend Family and (IDA) and NGO coordination of nutrition tentatively scheduled forWelfare activities through support for: (a) the early 1994.

development and implementation of (CofInancins to becommunity-based nutrition programsa and determined.)(b) policy-oriented nutrition researchprograms. Environmental AssessmentCateaorv C.

Ministry of 40.0 (R) Agricultural Reaearch Management - Consulting services will Appraisal mission isAgriculture (IDA) Would improve the relevancy of research be rsquired to assist scheduled for February

output through support to institutional1 with implementation. 1994.administrative strengtheningrsupplementary infrastructure, equipmentand staff training; and contractresearch funding. EnvironmentalAsessment Caterory C.

Bangladesh Water 106.0 River Bank Protection - Would provide Consultants are Appraisal report underDevelopment Board (IDA) protection against damage caused by providing ongoing preparation.(BWDB) normal bank erosion hazards at two sites services. Project scope reduced.

(primarily towns end majorinfrastructure), along the BrahmaputraRiverss West bank by construction ofsustainable bank protection end rivertraining works. EnvLronmentalassessment has been orengard and a draftresettlement Plan for bank nrotectionworks is being reviewed. EnvironmentalAssessment Category B.

Bangladesh Water 46.0 Coastal Embankment Rehabilitation - Tha Consulting services will Appraisal report underDevelopment Board (IDA) objectives of the project are: be required for project preparation. Awaiting(BUDS), Forest (a) cyclone protection, including implementation and receipt of resettlemntDepartmont (FD) security of persons living in protected training, and are plan.

areas; and (b) improving agricultural expected to be financed (Cofinancing confirmed byproduction, through preventing saline by the Buropean European Comunity.)inundation during normal annual monsoons Comsunity.and improved cropping patterns due to Retroactive financina ofreduced cyclone risks. The project USS2so5000 is beingwould include rehabilitation and considered.improvement to coastal embankments (endtheir appurtenant structures), Procurement: Bidafforestation of embankments and documents for main civilforeshore, improved operation and works contracts undermaintenance, and training. preparation. Pre-Environmental Assessment Catetorv B. qualification

applications underreview.

Roads and Highways 141.1 (R) Second Road Rehabilitation and Consulting services will Appraisal rcport underDepartment (RID) (IDA) Maintenance - Project includes: be required for project preparation. Awaiting

(a) implementation of a four year time- implementation. receipt of resettlementslice (about 2000 km) of REDs Road Proposals for plan.Master Plan for vestern Bangladesh supervisory consultants (Cofinancing expectedincludi>ng rehabilitation of about being evaluated, from ODA (United165 km, widening of about l00 km and Kingdom).)periodic maintenance of about 1800 kmof roads, (b) technieal assistance for Retroactive financinz ofdesign and supervision, and un to USS5.0 million is(C) institutional development of RED end beins considered.associated entities. Total project costestimated at US$237.1 million. Procurement: bids forEnvironmental Assessment Category B. first year program being

evaluated.

- 138 -

Member Country, Amount £Implementing Probable Stage of Processing ndAgency 1 Lender Project Consultlng Services Action on Procurement 4

(Cont'd)

Jamuna 200.0 Jaauna Multipurpose Bridge - Consultants will be Appraisal completed.Multipurpose (IDA) Construction of a major multi-purpose required for project (Cofinancing from ADB forBridge Authority (road-energy telacommunications bridge management and civil US$200.0 millions and

across the Jamuna (Brabmaputra) River to works supervision. Japan).reduce transport costs and support theNorthwest's economic integration with Procurement: Civil worksthe rest of the country. Total project componento to be financedcost estimated at US$684.0 million, by IDA, and co-Supolementary Environmental studies financiers. Pre-completed. Some involuntary qualification completed.resettlement will be recuired. Bidding documentsResettlement action Plan irepared, completed, and bidsEnvironmental Assessment Catezorv A invited on September 1,

1992. Bids were receivedJune 30, 1993, and areunder evaluation.

Petrobangla Group 175.0 (R) Gas Infrastructure Development - Consulting services will Post appraisal mission is(IDA) Project will include: (a) integration be required for in the field.

of gas grid (Baikhrabad-Ashuganj implementationpipeline), (b) upstream drilling and supervision. Experts on Procurement: Biddevelopment, (c) gas dehydration gas network analysis, documents for pipelinefacilities; (d) grid control and pipeline engineering and being finalized. Advanceoperations safety systems; and environmental safety procurement actionCe) technical assistance in gas network covered by Japanese required for all the GIDPmanagement. Environmental Asse5sment Grant acility. components.Catesaorv A.

INDIA

Government of 100.0 (R) Earthquake and Reconstruction - The Consulting services will YEPS meeting completed.Maharashtra (IDA) proposed project will provide consulting be required for Pre-appraisal mission

services, goods and works to assist the preparation. completed. AppraisalGovernment with reconstruction in the mission scheduled forearthquake affected area including: early January 1994.(a) rehabilitation of housing and small An IDA advane- ofbusiness promises, including US$1.5 million has beenstrengthening of existing structures; approved under the PPF to(b) rehabilitation of public buildings finance consultantssuch as schools and hospitals, services and to initiate(c) restoration of educational, medical the purchase of essentialand other social services; and goods and works.(d) technical assistance for design,supervision and monitoring of projectcomponents. Additional components suchas monitoring of future seismicactivity, mitigating impact of futuredisasters, and stimulation of the localeconomy may be added. EnvironmentalAssessment Category B.

- 139 -

Member Country, Amount CImplementing Probable Stage of Processing andAsency Leznder Project Consulting Services Action on Procurement

(Cont d)

Government of 121.0 (R) Haryana Highway Upgrading - Project Consulting services will Project uwderHaryana, (Bank) will include: (a) widening and be required for project preparation.Department of reconstruction of about 800 km of high coordin tion and An IBRD advance ofPublic Works volume traffic on state highwayss nd supervision of civil TJS$1.4 million has bean

(b) establishment and initial operation works, approved under the PPF toof a Road Managament System (RMS) for finance consultants'state highways. Enironmental services for projectAssessment Categorv B. preparation.

Procurement Proposalsfor preparation services,in combination with thosefor coordination andsupervision, have alreadybeen invited onNovember 1. 1993 fromshort-listed firms.

Ministry of 140.0 National Agricultural Technology - The Establiahment of Working Project preparation hasAgriculture/ (IDA) project would aim to: (a) increase the Group for preparation is begun by the GovernmentIndian Council of efficiency and relevance of the in process. Consultants of India. Initial reviewAgricultural agricultural technology development and will assist working of this work would beResearch dissemination system through group in preparation. undertaken by the Bank in

institutional and policy adjustments, Cost vill be covered early 1994.and support for priority research under Japaneso Grant.activities in accordance with nationaldevelopment objectives needs of farmers,and sustainable use of natural resourcebase, and (b) assist with human capitaldevelopment at all levels in the system.Environmental Assessment Cateaorv C.

Ministry of 100 0 (R) Agricultural Human Resources Consulting services will Government of India andAgriculture, (IDA) Development - The project would: likely be required in participating statesDepartment of (a) strengthen the capacity of four four areast (a) higher currently preparingAgricultural participating states to menage education curriculum project proposals. TheseResearch and agricultural human resources; assessment and reform; will be reviewed duringEducation (b) improve the quality and relevance of (b) university the preparation mission

agricuLtural education and in-service administration; (c) in- which is currently in thetraining; (c) enhance the effectiveness service training field. Boardof public staff by rationaliuing asseasmentoverhaul; and presentation scheduledpersonnel policies; and (d) open up the (d) manpower planning/ for September 1994.education and training system to the management with emphasisexternal world of ideas. Environmental on monitoring andAsseasment Category C. evaluation.

Department of 250.0 (R) Basic Education II - The proposed Consulting services will Project preparation underEducation, (IDA) credit would finance primary education not be required. way.Hinisitry of Human development in approximatelyResources, 25 districts in the states of Aasam,Government of Haryana, arnataka, Kerala, MaharashtraIndia and Tamil Nadu, as well as state

institutional capacity development. Theobjectives of the proposed project wouldbe to reduce dropouts, increase learningachievement, and expend access intargett-d districts through improvedteacher training, learning materials Andschool management. EnvironmentalAssessment Catexorv C.

- 140 -

MHber Country, Amount &Implemanting Probable Stage of Processing andAgJncy Lander Project Consulting Services Action on Procuremnt '

IDDI(Cont d)

Ministry of 500.0 Social Safety Nets II -The project To be determined. Initiating Memorandum notFinance (IDA) would assist in enhancing the policy yet scheduled.

framework and critical investments inkey areas that serve the pool.8nvironmental Assessment Catetorv: ToBe Determined.

Bombay 100.0 (R) Bombay Urban Transport II - Project Atkins International is Policy conditionality onMetropolitan (Bank) has two components: (a) the improvement providing consultant cogmuter rail andRegional of traffic carrying efficiency of the services for project resource constraints ofDevelopment road and commuter rail network, and pr4paration. the state are causingAuthority (AMRDA) the bus system efficiency, and the some delay in project

development of urban transport planning preparation. Preparationand traffic engineering institutionsl mission scheduled forand (b) financial investments in new and December 1-12, 1993.upgraded road and rail links, roadoverpasses, public bus systems, trafficengineering and traffic enforcemntmeasures, and training end technLcalassistance in support of the abov.Environmental Assessment Catesorv A.

To be determined 250.0 Export Development II - Facilities would To be determined. Project being identified.(Bank) be financed to support further exports

development. Environmental AssessmentCategory B.

Hinistry of 300.0 Trade Adjustment II - This is Part Ir of To be determined. Initiating Meorandum notComnerce (Bank) the Sector Adjustment Loan aimed at yet scheduled.

liberalizing the import regime andnuhancing export promotion. Will also

finance investment in modernization andupgrading of export production, andatimulate further specialixation throughtechnical assisLtnce and infrastructureinvestment. Environmental AssessmentCategory: To Be Determined.

Government of 100.0 (R) MP Forestry - Development of Consulting services for Pre-appralsal missionMadhya Pradesh, (IDA) statewLde forestry project in Madhya project preparation were completed.Forest Department Predesh which will comprisa provided by DHV

institutional reform plantation Consulting Company usingdevelopment national forest management, Dutch Trust Funds.wildlife conservation and biodLversity.Environmental As_sessment Category B.

Ministry of 400 .0 Agriculture SAL - Continuing support of Indian consulting firms Initiating Memorandum notFinance and (IDA) India's adjustment process in the TATA Consultants and yet scheduled.Minlstry of agrlcultural sector. Environmental ICIDR are providingAgriculture Assessment Category: To Be Determined. consulting servlces for

project preparation.

Ministry of Water 100.0 (R) National Hydrology - The project A preparation Pre-appraisal misslon isResources (IDA) would upgrade the institutional and consultwncy is scheduled in the field.

technical capabilities of central for between mid-Octobergovernment agencies and participatory 1993 end mid-Decemberstates to measure, collect, store, 1993.disseminate and analyze hydrological endrelated clinatological data related tosurface water and groundwater includingwater quality aspects. EnvironmentalAssessment Category C.

-141 -

Member Country, Amount &mplemantint Probabl- Stage of Processing and

Agency Lndear I Project ConsultLng ServLces Action on Procuremnt

(Comt* d)

Public Works 250.0 (R) Tamil Nadu Water Resources To be determined. Identification comploted.Department, Tanmil (Bank)l Consolidation - To support a state level Preparation under way byNadu (IDA) investment program to: (a) improv Government of Tamil Nadu

performance of irrigationl (b) improve with assistance ofopevations and maintenance; (c) complete consultants. Pro-and rehabilitate irrigation schemes - appraisal mission(d) Lmprove water planning; and completed.(a) upgrade sector inAstitutions andmanagement. Environmental AssessmentCateaoRr A.

Coal India Ltd. 400.0 (R) Coal Sector Rextructuring - Support Local and foreLgn Appraisal mLisLon(Bank) the implementation of a reform program consulting services will scheduled for March 1994.

in thb coal sector. Focus on be required.commercializing the enterprises in thecoal industry and improving themanagement of environmental issues,Finance the expansion of existing mines.Environmental Assessment Catesory: ToBa Determined.

Health, Medical 130.0 (R) Andhra Pradesh Health Systems - The To be detemined. Project preparation underend Family Welfare (IDA) project would enhance the quality of way.Department, Andhra health cars, primarily at the referralPradesh level, end would rationalize the

services of the public *ystem in thestate of Andhra Pradesh. The projectwould include policy and guidelinsdeavlopment, and investments in physicalinfrastructure, equipment, aedicalsupplies, and training. EnvironmentalAssessment Catezory C.

Ministry of Health 130.0 (R) Tuberculosis Control - The project To be determined. Project preparation under(IDA) would provide for better identification, way.

case management, treatment complLanceand monitoring so as to reducetrsansmission of the disease and toreduce morbidity and mortality.Environmentel Assessment Category C.

Indlan Council of 47.0 (R) Forastry Research Education and Consulting services vill Green cover staffForestry Research (IDA) Extension - Project will include: be required for the Appraisal reportand Education (a) development of forestry research devolopment of the eompleted. NegotiationsCICWRO) management systems (b) support for research management under vay.

selected research progremst system and associated(e) development of forestry research and MIS, and for specialiced Retroactive finanein2 ofextension; end (d) management of forestry research upn to USS4O0, million hasprotected areas. Envronmental programs. been reauxt-d b-y theAssessment Category C. Covernment and would also

cover several contracts.

UP Jai 100.0 U.P. Water Supply and Environmental Consulting services will Project underRigam/Government (IDA) Sanitation - Provision of rural water be required, preparation.of UP supply. environmental sanitation

facilities, end coemunity participationhealth programs. EntonmntlAssessment Category D.

- 142 -

MXgbar Country, Amount aImplementing Probabl- Stage of Processing andAgency ' Lender I Project 3 Consulting Services Action on Procurement 4

Ia(Cont'd)

Container 100.0 (R) Container Transport Logistics - Tha ConsultinS services will Pre-appraisal missionCorporation of (Bank) project would support the d<velopment of be required. Financing completed. Draft PEPSIndia (COIfCOR) multi-modal transport in xelected will be provided by the issued for review m eting

corridors to increase the capacity end Natherlands. on December 10, 1993.*fficiency of long haul transport of Appraisal missionhigh value general cargo, particularly scheduled for Januaryrelated to foreign trade. Environmental 1994.Assessment Category B.

Retroactive flnancing ofup to USS5.0 million tocover elitibleoxvenditures incurredafter January 1. 1994 foruraentlv needed containerhandling *ouinment hasbeen request-d by theGovernment.

Procurement. Short-listed firms have beeninvited to aubmitproposals.

Department of 204.0 (R) Orissa Water Resources Consolidation To be determined. Pre-appraisal missionIrrigation, (Bank)I (WRCP II) - To support a state level completed.Government of (IDA) investment program to improveOrissa performance of irrigation and expand

irrigation and drainage; improveoperation and maintenanc-e complete andrehabilitate irrigation schemes, andreform sector institutions.Environmntal Ass*sament Category A.

Ministry of Health 130.0 (R) Blindness Control - The project Expatriate consulting Negotiations tentatively(IDA) would reduce cataract blindness by services will not be scheduled for January

raising ophthalmic surgical capabilities required. 1994.in fixed facilities and camps, whilepromoting public awareness. - -- Retroactive financing ofEnvironmental Assessment Category C. un to USS3.5 miLlion to

cover eligible

expenditures incurredafter February 28. 1993for several purposesfound apnrooriate (e..to provide orientationfor new districtsocieties, beginstrenathenina training

institutions. developtrainLrm and information.education andcomsunlcation (IEC)materials, and inltiatecivil works) has beenrecuested by theGovernment.

Departments of 130 0 (R) Population IX - Support of family Expatriate consulting Appraisal mLsaion is in8ealth a Family (IDA) welfare program in the states of services will not be the field.Welfare (states of Rajasthan, Assam and Karnataka. required.Rajasthan and Components to include service delivery.Asasam) civil works, communications, and program

management. Environmental AssessmentCategory C.

- 143 -

Member Country, Amount iImplementing Probabla Stage of Processing andAgency I Lender Project I Consulting Servicas Action on Procurement

(Cont d)

Porest Department 77.4 (R) AP Forestry - Development of Consulting services for Green cover staffAndbra Pradcsh (IDA) statewide forestry project in Andhra project preparation were appraisal report

Pradesh which will comprise provided by a Dutch firm completed. Negotiationsinstitutional reform, plantation using Dutch Trust Funds. completed December 3,development, natural forest managoment, 1993.wildlife conservation and biodiversity.Environmental Assessment Catesorv S. Retroactive financina of

uo to USS2.0 million,which would also coverseveral consultantservice contracts, hasbeen recuested bv theGovernment.

Government of 187.0 (R) Rerala Urban - Project seeks to Consulting services have Preparation missionK-rala, KUDP (Bank) improve urban fiusncing, managem nt, and been engaged to assist completed. Pro-appraisalProject Management efficient resource utilization in with project mission planned for MarchUnit provision of urban services. Will also preparation. 1994.

focus on improvements in finance,traffic and transport, water supply,sanitation end environmentalimprovements. Environmental AssessmentCatezorv A.

Governments of 100.0 Agriculture Development Assam - Project To be determined. Preparation ofAssam (IDA) will assist state government in policy Agricultural Strategy

reforms and investments in priority Paper in progress to leadsubsectors. Environmental Assessment project preparation.Categoryi To Be Determined.

Directorate 85.0 Leprosy Control - The project vould Consulting services will Approved by the ExecutiveGeneral of Health (IDA) *liminate leprosy as a public health be provided by the World Directors on June 29,Service Ministry problem by the year 2000 by: Health Organization 1993.of Health & Family (a) accelerating control efforts, (WHO).Welfare (b) promoting efficient mix of service Retroactive financing of

delivery mechanisms, (c) policies and ug to US$3.0 milliontrategiess (d) more effective package would be provided toof services and disability cares and cover eLtgible(d) appropriate technology. The project exoenditures incurredwould treat 4 million leprosy patients, after March 31. 1993 toEnvironmental Assessment Category C. exoedite nroiect.

National Thermal 400.0 (R) NTPC Power Generation I - The Local and foreign Approved by the ExecutivePower Corporation (Bank) proposed project would comprise: consulting services will Directors on June 29,(NTPC) (a) generation caoacitv additions - a be required. 1993. Credit was signed

five year tine-slice of NTPC's least on December 9, 1993.cost investment program of new coal andgas-based pover stations for which full Retroactive financing offunding has not yet been arr-ngedi uD to USSlO.0 million to(b) Drivate sector comoonent - support cover cost of materials.to NTPC to undertake several joint sauinment and servicesventure operations; and for the implementation of(c) *nvironmental strenathening nd the MgP incurredresettlement and rehabilitation - 12 months nrior to loanimplementation of an Environmental signitn (C0l01/93) hasAction Plan (UAP) which includes been reouested by NTPC.environmental upgrading projects,training and technical assistance forthe strengthening of NSPC,senvlronmental end resettlement andrehabilitation (RCR) managementcapabillty and the implmentatton of theEA?. Environmental Assessment Cateaorv9.

Member Country, Amount &Implementing Probable Stage of Processing andAgency Lwnder 2 Project Consulting Sarvices Action on Procurement

(ContVd)

Department of 250.0 (R) Haryana Water Resources Local and foreign Appraisal missionIrrigation, (IDA) Consolidation (WRCP I) - To support a consulting services will completed.Government of state level investment program to be required.Haryana improve performance of irrigation and

expand irrigation and drainagsa Improveoperations and maintensnce$ modernizeend rehabilitat- the state irrigationnetvork; and reform sector institutions.Environmental Assessment Cateeor A.

Ministry of 150.0 Port Modernization - Project vill focus To be determined. Bank sector report hasSurface Transport (Bank) on port modernization and productivity been sent to the

improvements with no major new Government, andconstruction works. Environmental preliminary discussionsAssessment Cateaorv A held. Further

discussions plannedbefore scheduling projectpreparation mission.Shipwast- study receivedand submitted toGovernment.

Ministry of 200.0 (R) Industrial Pollution Prevention - Japanese Grant approved Formal request receivedEnvironment & (Bank) Set up industrial waste mini-mization for funding of from Government of India/Forests and clean technologies program. Other preparatory studies. Ministry of Environment

objectivea include: (a) promoting and Forestry (GOI/MOEF).effective and timely application of Pro-appraisal missionenvironmental legislation regarding the completed. Appraisalgeneration, disposal and release of mission scheduled forindustrial pollutants; (b) supporting January 24, 1994.efforts by industry to preventgeneration or encourage recycle ofhazardous materials or to properly treatand dispose of toxic substancesa and(c) promoting development andapplication of novel techniques formini-mization of waste Project villcontinue the program of support to thedevelopment of the enforcement andmonitoring institutions initiated in theIndustrial Pollution Control Project.Environmental Assessment Cateserv C.

Municipal Health 79.0 Family Welfare (Urban Slums) - Project No expatriate Approved by the ExecutiveDepartments of (IDA) would support strengthening of family consultants required. Directors on June 18,Hyderabad, welfare (family planning and maternal- 1992.Calcutta, child health) services in alum areas ofBangalore, municipalities through establixhment and Retroactive financin* ofAhmadabad, Xanpur staffing of urban health poets and up to USS0.5 million toand other cities support for training, communication and cover expenditures for

improved management components under the costs incurred afterfamily welfare urban revamping schme. November 30. 1993 inEnvironmental Assessment Cateory CE imalementint appraised

activities, have beenrecuested by theGovernment.

Madras 200.0 (R) Madras Water Supply and Sanitation Consultants have bean Appraisal missionmetropolitan Water (Bank) II - Project would support major retained to assist vith scheduled for May 1994.Supply and expansion of water supply and extension projcet preparation.Sanitation Board end operational improvements of savage(Metrowater) collection and disposal. It would also

prepare and finance initialenvironmental sanitation program andinstitutional development programs.Envlronmental Assessment Category A.

- 145 -

Member Country, Amount &ImpL1menting Probable Stage of Processing andAgency Lender Projoet ConsultLng Services Action on Procurement

(Cont 'd)

municipal 200.0 Bombay Sewage Disposal - Would finance Expatriate consultants Appraisal missionCorporation of (Bank) construction of two 3-kD marine outfalls have been retained to echeduled for April 1994.Greater Bombay and two aerated lagoons. TechniLal assist with project

assistance would bc included for preparation.construction supervision. EnvLronmentalAssessment Cate.orv A.

Ministry of 500.0 Financial Sector Adjustment I - Loan to Consulting services will Initiating Memorakndum notFinance and (Bank) strengthen the financial system by be required. yet scheduled.Reserve lank of restoring financial health to theIndia banking institutions, effecting a timely

transition to a market-based system offunding Government debt, reducingGovernment direct interventions, andstrengthening and modernizing bank legaland supervisory frameworks and enhancingLnvestor protection in capital markets.Environmental Assessment Catexory C.

. EPAL

Nepal Agricultural 10.0 (R) Agriculture Research - The project Need for consultants not FA0ICP preparationR-search Council (IDA) would% (a) strengthen the institutLonal yet determined mission vas in the field(MARC) capability for research services by Ln September/October

improvLng organizational structure and 1993, and concluded thatmanagement procedures; (b) upgrade the the NARC is still inquality and performance of local transition. Additionalmanpover rescurcest (c) rehablttate policy and proceduralselectively existing facilities in the reforms are requiredregions (d) support a research program before a project can beto dLrect resources towards priority processed. Pre-appraLsalresearch topics and commodities; and mission tentativelyWe) develop and test in the hill areas scheduled for Februaryappropriate low cost technologies. 1995.Environmental Assessment Cateaotr C.

Miniatry of 25.0 Forestry IV (Second Tcrai Forestry) - Consulting services will Project preparation underForests and Soil (IDA) The project will assess all forest be required for way.Conservation resources in the Terai and Sivaliks to preparation and

establish an optimal resource implementation of Forestallocation. It will include: Management Plans(a) resource assessment; (b) preparation extension, organizatLonand implementation of forest management and development.plans: (c) establishment and managementof coemunity and private forests;(d) institutional development andstrengthening; and (a) forest research.Environmental Assessment Catesory S.

Ministry of 20.0 (R) Higher Education - To support Need for consultants not Board presentationEducation and (IDA) ongoing reform at Tribhuvan University yet determined, but if scheduled forCulture (TU) through enhancing planning and necessary would be in December 21, 1993.

management capacity, improvLng physical the area offacilities and means of instructLonal institutionaldelivery and assisting TU and the development.Ministry of Education end Culture Inpreparing the introductitn of highersecondary education. EnvironmentalAssessment Catesorv C.

- 146 -

Member Country, Amount S

Implementing Probable Stage of Processing andAgency Lender ̂ Project Consulting Services Action on Procurement 4

(Cont d)

Department of 57.0 (R) Road Maintenance - Project includes: Consultants for project Government delegation hasRoads (DOR) (IDA) (a) support of institutional development preparation and road been invited for

in the road soctors (b) support for a rehabilitation have been negotiations.four year periodic road maintenance appointed. AddLtional (Cofinaneing from SDC andprogram in central, western, mid- consulting services will ODA is being finalizedwestern, and far western regions; be required for for the training(c) rehabilitation of 400 km priority implementation of component and from UNDPtrunk and feeder roadst (d) pilot labor periodic maintenance for the pilot labor-basedbased district road rehabilitation; and programs. district road component.)(e) technical assistance and trainingfor planning, budgeting, and engineering Retroactive financing ofdesign and supervision of vorks uo to US81.2 million isproposed. Environmental Assessment expectsdCategorv B.

Department of 40.0 (R) Irrigation Sector - To: (a) Consulting servlces vill Project preparationIrrigation (IDA) construct small and medium-siLed farmer be required for project postponed until second

managed surface schemes and rehabilitate implementation. half of 1994.existing farmer managed surface schemesin the Hills and Torai areas; (b)construct farmer-group maunagedgroundwater schomes on the Teraig(c) institutional development support.Environmental Assessment Ca teorv B.

Ministry of Health 36.2 (R) Population and Health - To improve To be determined. Negotiations tentatively(IDA) health conditions and reduce population scheduled for January

growth by strengthening of family 1994.planning and maternal child healthprograms. Environmental Assessment Retroactive financina ofCategorV C. Up to USS200.000 Ls

expected.

Nepal Electricity 108.0 Power Generatlon - 402 MW run-of-river Consultants have been Post appraisal missionAuthority (IDA) hydropower plant wlth associated appoint-d. has returned from the

transmission facilities and field.institutional strengthening of the Nepal (Cofinancing from ADB,Electricity Authority. Action Plan to Swedish Agency forameliorate the hvdro oroiect's International Technicalenvironmental imnacts is beina finalieed -Economic Cooperationand will be imolemented in coniunction (BITS), KfW, OECF, UNDP,with this oroiect. Environmental the Government ofAssessment Catexorv A Finland, and possibly the

Governments of France andGermany (GTZ).)

PAKISTA

To be determined About (R) Secondary Education - The project Consultants have been Covernment task forces90.0 would help reform and develop the selected to support are preparing provincLal(IDA) secondary education sector and would Government task forces secondary education

support: (a) improved access, quity responsible for defining strategies on whichand efficiencyt (b) enhanced quality of secondary educatlon projects will be based.secondary education teaching end strategy and to preparelearning, (c) reform to the examination project to implementsystem; (4) enhanced participation of that strategy.the private sector; and (e) strengthenedinstitutional capacity. EnvironmentalAssessment Categorv C.

- 147 -

Member Country, Amount SImplementing Probable Stage of Processing ndAgency tLender t Project I Consulting Servlces Action on Procureamnt 4

PASS(Cont,d)

To be determinad About (R) Education Sector Reform - The Need for consultants not The projet has not yet

56.0 proJect vill support: (a) a policy yet determined, been fully identified.(IDA) reform in the education sector, Sigher education

including promotitg coenity component being preparedinvolvement in elementary education, wLth bilateralstrengthening education administration, assiStance.and improving education qualityl and(b) reform in higher education toimprove accountability, efficiency,quality and increase cost recovery.Environmental Assessment Catetory C.

Water end Power 25.0 Ghari BarothA Bydropower (Phase I) - The WAPDA Intends to extend Project underDevelopment (Bank) proposed proj3et vould include: consultancy agreemnt of preparation.Authority (WAPDA) (a) land acquisition of about already engaged

3,600 bectaros. (b) relocation of consultants to provide198 families vith a surveyed population neaded technicalof 980 persons: (c) preliminary works: assistance.(d) support for implementation of theactivities for environmental managementand resettlementt and (a) technicalassistance comprising consultsncyservices. Environmental AssessmentCatestory .

Water and Power 200.0 (R) Sahiwal Power - The proposed project Consulting services will Project underDevelopment (Bank) would consist of an investment component be required for project preparation. DraftAuthority (WAPDA) involving the design, supply of preparation and environmental assessment

equipment, installation and implementation. is being revised.commissioning of a 600 MW combined- A PPF may be requested.cycle power plant to be set up at (Cofinancing of aboutSahiwal. consisting of two blocks of US$150.0 million is300 MW each. The project vould be expected.)financed and implemented by the privatesector alone or jointly with WAPDA. The Procurement$ Procurmentother components vould be: (a) the draft pre-qualificationtransmission line and substations for documentation underthe evacuation of power from the power preparation. Requestsplant to the main arid; and (b) a for proposals fortechnical assistance component for consultancy services areconsultancy services for (i) project under review.engineering and supervision;(Li) assisting COPIWAPDA in addressingenvironmental issues and preparingresettlement plans. EnvironmentalAssessment Category A.

Water and Pover 150.0 National Drainage Program - The project Preparation, fundLd by Preparation under way.Development (Bank) aims to rationalize public expenditures UNDP, being carried outAuthority (WAPDA) for drainage, streamline implementation by a consortium of

arrangemnts, complete ongoing projects, NESPAU-MW.P Additionalatrengthen operations and maintensnce, consulting services areand strengthen drainage institutions, expected to be required.Environmental Assessment Category B.

Balochistan 18.0 (R) Balochistan Natural Resources Consulting services will Appraisal missionEnvironmental (IDA) Management - Project seeks to strengthen be required for project completed. NegotiationsProtection Agency Balochistan Environmental Protection implementation. scheduled for

Agency, develop end conserve December 13, 1993. BoardBalochistan's natural resources, presentation scheduledparticularly watersheds, national parks for February 8, 1994.and coastline. Environmental AssessmentCatemory B.

Member Country, Amount &Implementing Probabla Stage of Processing ndAgency Lander Project Consulting Services Action on Procuremint 4

PAKISA(Cont d)

Balochistan 34.0 talochistan Minor Irrigation and Area Consulting servlces Vill Project underIrrigation (IDA) Development - The project would increase be required during preparation. AppraisalDepartment agricultural production and farm income project implementation, mission tentatively

in the least developed province through scheduled for Februaryminor irrigation and coammand area 1994.development works, would improveinstitutional capacity for planning andimplementing such works, and wouldstrengthen local participation inIrrigation development. EnvironmentalAssessment Category B.

Ministry of 80.0 Population II - The project would Consulting mervices will Project underPopulation Welfare (IDA) support the national population program be required for preparation.

through extending family planning preparation andcoverage, improving servLce quality, and implementation.stimulating service demand.Environmental Assessment Category C.

Government of 200.0 (R) Social Action Program - The project Consultants likely to be Yellow cover reportPakistan, (IDA) would improve human resource development required. distributed December 9,provLncial through improved social services 1993.governments, AJX (particularly for women). Environmental (Cofinancing has beenand federal Assessment CatesorY C confirmed from the Dutchterritories and ADB.)

RetroactLie financina ofis envisaged: exactamount would bedetermined after returnof anoraisal mission

National Cresent 135.0 (R) Karachi Kydrocracker - Project would Project management Appraisal mission isPetroleum Limited (Bank) assist in mobilizing resources for consultanti to assist scheduled for February(NCPL) cofinancing private sector investments NCPL in project 1994.

in development of the refinery preparation and (Cofinancing is expectedsubsector. Project would also promote: implementation have been from other donors.)(a) efficiency and ensure petroleum appointed.products supply while reducing Procurement: Biddingenvironmental pollution- and documents have been(b) institutional strengthening of reviewed by the Bank, andproject company. Financing will be released to theprovided on a limited recourse basis to shortlisted turnkeya private joint venture company, the contractor's bidders.National Cresent Petroleum Limited(NCPL), with responsibility to design,build, finance, own and operate ahydrocracker complex in Karachi.Environmental assessment undermreoaration. Environmental AssessmentCatetory A.

To ba determined About Nutrition - Th- project would finance Consultants vith Project under65.0 nutrition education, micronutrient and expertise in nutrition, preparation.(IDA) growth promotion programs, institutional agriculturelfood

development, and applied research, processing, ruralEnvironmental Assessment Cateaorv C. sociology, health

mmangement,communications and/orcommunity development

will likely be required.

149 -

Member Country, Amount &Implementing Probable Stage of Processing andAgency Lender I Project ' Consulting Services Action on Procurement 4

PJhXISS4A1(Cont fid)

Directorate of About NWFP Primary Education - The program Consultants likely to be A4praisal mission is toPrimary Education, 80.0 will support primary education develop- required in management be scheduled for MarchGovernment of (IDA) ment in the northwest frontier provinces textbooks, coamunity 1994.Northwest Frontier (NWPP), particularly for girls. The development, and private (Cofinancing is *xpectedProvinces objectivos are to: (a) improv sector participation. from other donors.)

efficiency of the systeml (b) improveeffectiveness and quallty of education,end (c) community participation. Itwill likely support policy measures andplanning managemnt refors.Environmental Assessm. n t Catory C.

Punjab Forestry 95.0 Forest Sector Development - Forestry Consultants have been Preparation under way.Dcpartment, (IDA) sector developmcnt in Punjab end the appointed for Appraisal missionCapital capital territory. The projeoct seeks to prepazation. tentatively scheduled forDevelopment strengthen forestry institutions, February 1994.Authority rehabilitate scrub forest areas, end

promoto social forestry. EnvironmentalAssessment Categorv B.

State Sank of About (R) Financial Sector Deepontng and Consulting services will Appraisal report underPakistan, 210.0 Intercmdiation - To support reforms be required for Sank preparation.Corporate Law (Bank) deepening of the financial sector and supervision, securttiesAuthority provide resources to banks for lending market regulAtion,

to the private soctor. Environm-ntal portfolio audit ofAssessment Catetere B. various financial

iwntitutions, insuranceregulation, and bankprivatization.

Uater end Pover 250.0 (R) Ghazi-Barotba Bydropower (Phase WAPDA intends to extend Project design completed.Development (Bank) II) - Project would provide for consultancy of already (Cofinancing from Japan,Authority construction of; (a) a larrage. on engaged joint venture of Belgium, UK, etc. is

Indus River, about 7 km dis of Zarbala five firms, expected, i.e. OECF,dani (b) a 33 km long single concrete EXIM, ODA ADB, RIB,lined power chanoels and (c) a power etc.)complox with 1450 NW power house(5 units of 290 MW each) and associated Procur !t;t Draft bidinfrastructure facilitiea including documents for500 kv circuits. Environmental prequalification endAssessment Cateaorv . civil works completed.

Environmental About Punjab Urban Environment - Arrest Expressions of interest Appraisal missionProtection Agency 50.0 decline of urban environment through are solicited from scheduled to be earlyof Punjab, Water (IDA) hazardous waste control, ground-water consultants for the 1994.and Sanitation resource protection, public awareness areas of environcantal (Will also Include aAgency (Lahore and EPA strengthening. Project protection and waste landfill gas extractionDevelopment comprises wastewater treatment, solid treatment. component to be financedAuthority) vaste mana-ement and industrial waste by the Global Environment

treatment (tanneries), public awareness Facility, and is to beand education, and technical assistance constructed end operatedfor institutional strengthening, under a private sectorEnvironmental Assessment Cateaorv A. concession agreement.)

Ministry of About Telecommunications Regulatory Support - Consulting services will Preparation has beenCommunications 40.0 Project would assist in the be required for delayed pending agreement

(Senk) restructuring of telecomamnications preparation and between Government of:ector including regulatory reform and implementation of the Pakistan end IBRD onsactor liberalization. Environomntal project. restructuring of theAssessment Category C. sector.

- 150 -

Member Country, Amount EImplementing Probable Stage of Processing andAgency I L-ndesr Project I Consulting ServLces Action on Procurement 4

PAKISTAN(Cont d)

National About Private Sector Energy Development Fund Need for consultants not Preparation under way.Development 175.0 II - Wlll provid- funds for onlending as yet determined. (Cofinancing expected.Finance (Bank) cofinancier for privat- sector energy Donors to be identified.)Corporation projects and vill focus on strengthening

institutions vhich vill participate inprivato sector investments in the energysector. Environmental AssessmentCategory B.

Water and Power About (R) Power Sector Development - Consulting services Negotiations complted.Development 230.0 Implementation of a time-slice (FY93-96) will be required. Board presentationAuthority (Bank) of WAPDA s least-cost investment scheduled for February

program, and restructuring and 1994, pending fulfillmentprivatization program for WAPDA. Would of Board requirements.also includ* a technical assistance (Cofinancing from Asiancomponent. Environmrntal Assessment Development Bank, Japan'sCatezorv B OEC, and EXIM Bank are

committed. Othercofinanciers are beingidentified.)

Procurement: Bids forREWAT are being evaluatedand second set of tenderdocuments alreadyreleased to prospectivebidders.

Retroactive flnanclint ofUSS5.0 million vlll berecuested to coveradvance Pa_ments for thesubstation component.

National Housing About NWPP Community Infrastructure - Consultants have been Appraisal missionAuthority together 30.0 Community infrastructure upgrading in appointed for scheduled for Februarywith Provincial (IDA) urban slums and rural townships, with preparation. Need for 1994.Governments community participations development of consultants for A PPF advance of

land registration programst technical implementation to be US$1.3 million has beonassistance to the provincial government; determined, approved to provideand sector policy reforms related to technical assistance.coat recovery, and operations and Funds obtained from Japanmaintenance. Positive environmental and Switzerland forimnact eaxnected. Environmental preparation. -Asseasment B. (Cofinancing of up to

US$5.0 million may berequired forimplementation.)

Government of About Sindh Special Development - The proposed Consultants have been Board presentationSindh (GOS) 46.8 project would finance: (a) an i-mediate appointed for scheduled for mid-

(IDA) action plan to begin to deal vith preparation. Dee mber 1993.nvironmental and infrastructure Consultants vill be

problems in Xarachi and three interior required for Procurement; Draftcities. (b) support for strengthening implementation. bidding documents forthe Sindh Government s framevork and environmental upgradingprocedures for policy formulstion and end transportimplementation of the first five years improvements are underof its policy reform agendai and review by IDA.(c) preparation of engineering studiesfor the longer-term for the Covernment oa

investment program for transportimprovements in Karachi and threeinterior cities, EnvironmentalAssessment Category B.

- 151 -

Member Country, Amount i

Implementing Probable Stage of Processing andAgency ' Lander ' Project Consulting Services Action on Procurement

Ninistry of 45.0 National Roads - The project would Consultants have been Project is underTransport and (IDA) *upport institutional strengthening of appointed for project preparation.Highways the Road Development Authority, preparation. A PPF request of(Road Devlopment restructuring of the Road Construction USS .6 million has beenAuthority) end Development Company, and development approved far projeet

of local contracting industry in the preparation activitiesroad subsector. It would also finance (A Danish Trust Fundpart of a long-term road investment allocation of US$96,000program. Environmental Assessment is financing consultancyCategorv B. services.)

National Planning 40.0 Colombo Environmental Improvemnt - The Consulting services will Preparation is advancing.Commission, (IDA) project would include the following be required for solid Appraisal is expected byMetropolitan components to provide for abatement of waste management. February 1994.Environmental priority environmental problems and Expression of interest A PPF of US$1.5 mlllionImprovements prevention of future deterioration in have been solicited. has been approved.Program the Greater Colombo metropolitan region; (Cofinaneing of about

(a) solid waste management; US$25.0 million from ROCP(b) industrial waste abatement including is being xplored.)minimization measurex, end a wastetreatment plant; (c) clean settlementsprogrsmez (d) restoration of BeiraLake; end (a) technical assistance forstrengthening local authorities.Environmental Assessment Category A.

Ministry of Power 25.0 Alternative Energy - This project would Need for consultants not Feasibility studies underand Energy, Ceylon (IDA) fund cost effective alternative energy yet determined. vay.Electricity Board technologies, including solar(CEB) photovoltaic and possibly mini hydro

rural electrification as well as energyefficient applications, such as compactfluorescent lighting in rural householdsand in the urban commercial/governmentaland residential sectors. The projectwould promote private sector provisionof nergy services. Positiveenvironmental impact expected.Environmental Assessment Catetorv C.

Ministry of 35.0 Environmental Actton I - The project Consultants have been Project preparation underEnvironment and (IDA) would support policy, institutional, hired for preparation way.Parliamntary legal end investment operations for the work.Affairs implementation of the recently adopted

national environmental action (EAP).Environmental Assessment Categorvi ToSe Determined.

To be determined 30.0 Health and Population II - The project Consulting serviceas will The project hs not yet(IDA) would support health sectoral activities likely be required. been identified.

focusing on managemnt improvements.financing, service quality and promotingcomnmunity involvement. EnvironmentalAssessment Category: To Be Determined.

Ministry of Policy 40.1 Poverty Alleviation/Employmnt II - The Consulting services will The project has not yetPlanning and (IDA) project would facilitate access to likely be required. been identified.Implementation resourcas for self employment by the

poor. Environmental AssessmentCategory: To Be Determtned.

- 152 -

Member Country, Amount &Implementing Probable Stage of Proessing and

Aggney Lender Project ' ConsultLng Services Action on Procurement'

SRIT(Conted)

Tertiary and 50.0 (R) Vocational and Technical Education Consulting services will Preparation mission is in

Vocational (IDA) and Trairnng - Support for training at be required for advice the field.

Education various levels and in different sectors on setting training An IDA mP advane of

Comaission to meet the needs of the labor market, policy on strategy. US$480,000 has beon

Rationalization of tachnical education. planning, tntitutional approved.

Environmental Assessment Catesory C. strngthening,enterprise basedtraining, and thedevelopment of a skillsdevelopment fund forfinancing training.meeting priority needsof industry and otheremployer. Consultantshave been selected andare expected to begin inthe field in January1994. Consultantcontract for projectpreparation to be agreedupon soon.

Ministry of 75.0 Economic Restructuring I - To address To be determined. President's report under

Finance (IDA) broad policy reform agenda aiming at preparation.improved private sector incentives,including liberalization of external andinternal trade, and particularlydivestiture of the vast publicenterprise sector. EnvironmentalAssessment Category U.

To be determ=ned 50.0 General Edueation II - The project vill Consultants for a Bank Project has not yet been

(IDA) support the implementation of policy sector study have been identified. An updated

reforms and investment programs to shortlisted. asssamreAt vill be

improve education quality, with an aubmitted in 1994.

mphasis on school books. EnviromentalAssessment Cateaorv C.

Mahaveli Authority 17.0 (R) MIahavali Restructuring - To be determined. Appraisal mission

of Sri Lanka (IDA) Restructuring of the Mahaveli Authority tentatively scheduled for

(MASL) including: (a) privatiszation of January 31, 1994.

cocmercial activities; (b) transfer ofpublic service functions to nationalline agencissa and (c) handing over ofresponsibility for operation andmaintenance of distributary and fieldcanals to farmer' organisations.Irrigation and drainage structures vouldalso be rehabilitated *nd improved.Environmental Assessment Categor 3.

- 153 -

III. EiW PROJECTS ADDED D THIS ISSE

I. AFUXCA lEOII

counm m D EECr

'EN'

To be determined Labor Force Training/ 2DevelopzlOnt

To be determined Okauango ConservatiOn 3

To be dotorminod a~~~~~~nd Management

COTE D ITOIRE

ponds de Developpent de Labor Force 7

Formation Professionnelle Training Support

20 Boit- Postal* 1068Abidjan 20Coto d'Ivoire

Government of Tanzania, Songo Songo 33

Ministry of Water, Gas Development

Energy and MineralsP.O. Box 2000Dar-*s-Salaam, Tan=ania

To be determined Enviromnent Magumet 36

II ISAST ASIA MND PACIFIC REGION

Ministry of Economy Economic Management 41

and FinancePhnom-Penh, CambodiaFax% 873-177-0102Tele8hon: 85-23-27798

To be determined Financial Sector 41

Development

- 154 -

II. EAST ASIA AND PACIFIC REGION

CHI (Contd)

State Education Basic Education In 41

Commission Poor and Minority

35 Damucang Hutong Areas

Tidar, BeijingChinaFa: (86-1) 609-7041Televhone: (86-1) 602-5717

KONHA

Korea Maritime and Ports Developm nt 55

Port Administration and Environmantal

112-2 INUI-Dong ImplementationChongno-GuSeoul, KoreaFax: 744-9591Telephone: 744-4738

LAO, PEOPLE'SDEMOCRATICREFUBLIC

Ministry of Comminications, Highvay Improvement II 56

Transport, Post andConstructionVientiane,Lao, People'sDemocratic RepublicTelex: 4491

THAILARD

Provincial Electricity Distribution System 62

Authority (PEA) Reinforcement200 Ngam Wong RoadBangkok 10900ThailandFax: (662) 589-4850Telex: 72224Telephone: 589-0100

III. IUROPE AND CENTRAL ASIA REGION

ALBANIA

National Roads Department, Feeder Roads 66

Ministry of Transportand CommunicationsTirana, AlbaniaFax: (355) 42-27773Telephone: (355) 42-28198

- 155 -

IIX. p con"L muIA U c (Cont d)

Ministry of A4riculture Reform 68Agriculture and Food Supportul. Kirova 15,Mtnak 220031,B-larusa: 7 0172 261426

Telenhone% 7 0172 273131

Ministry of the Environment 71EnvironmzntTOOMpuieste. 24,TaIllin EE011OEatoniaFax: (372 2) 440 601Telex: 173238Telephone. (372 2) 691 489

To be determined Highway Maintenance 72

LUU

National Social Insurance social Security 77Institution (SoD"A)Ukmerges 12, Vilnius 32600LitbuaniaEn: (3702) 353641Tlephones (3702) 3548751354864

Eavironmental Protection Environnt 77Directorat- General3 kr-shehatyk Stzset,25001, KievLithuaniaF-x: (3702) 353 710Tel1nhons: (3702) 625 438

To be determined Economic Lav Reform 82

To be detrmained Land Reform 82Implentation Support

State Tax Service Fiscal Managemnt 82103381 Moscow, Neglinnayc,Ulitsa 23,Moscow, RussiaToleghon: 200-5388

To be determined Privat- Farm Dcvelopsent 89

- 156 -

ZY. LA- ANm-iC A CANUZ N

Ministry of Culture Decentralization of 92and Education Secondary Education IIPLazurno 935 (1020)Buenos Aires, Argentina

To be determined Rural Development 95

DAER - Depertamento State Nighvay 97Autoanomo do Eatradas Hanageontde Rodgem Rio Grand* do SulAv. Borges de Medoiros155, Porto Alegre,R.S., CEP 90.060BRAZZLt^: 55-51-224-7206elex: 51-1185

p levhg: 55-51-226-8177

V MIUDOL lAJS AND U3 AhIC MOTOR

Agence Nationale de la Imergency Desert Locust 125Conservation do la Nature

Soitt Postala 115 El-HammEl-Ann. AsserAlgiLrs, AlgeriaF*: 213-2-67-43-69Teleg: 65361 NUWATDZTelebhone: 213-2-67-40-72

Ministry of Agrlculture Agricultural Servie-s 125Routes des 4 Canons,TagarinsAlger, Algeria? : (213) 2 648-745Taext 936-66127 or

66170Telephone: (213) 2 711-712

River Transport Authority Damiette - Cairo Inland 127El Zahr&a Ather Zs E aby WatervayHair E1 KAdimat!t (20-2) 318-7079Telex: 29803Tuleahone: 920-2) 318- 7050

-157

IV. MI E D An TE ArRIC s U-GE (Coat'd)

wUWM AD RMneRJ no

Ministzy of g5alth Health Services Rshab. 129No rcltable postal addressavailable due to country'scircumstancesBeirut, LebanonTeloehon.a 961-1-645-0501

961-1-645-052

VI. SOtlE ASIA Ru1I

There Wear No Nwe Projects Reportod For This Period

III. PROJECS DPFD 1 LEDnG PRORAM RAD PROJECTS SrONRO

I. AFRICA RSIO

Kinistry of Coffee, Peasant Coffee 10Tea and State Fram DevelOpmentDevelepment

Central Bawk, PrLvate Sector 29Ministry Of ComMrre Dev-lopmentand Industry (MCI),Ministry of Public Worke,Banque National Rwvanda(BNR)

II. EAST ASIA AND PACIFIcC BGIOR

D=4XWS'S

REPULIC

Ministry of Education Education Sector 57and Sports Development

Department of Health Urban Health and 62Nutrition

Ministry of Education Primary Education 65and Training

Ministry of Transport Highway Rehabilitatton 65ProJect Management Unit

IIr EuROPE AND CRNTRAL ASIA RESTO

To be determlied Gas Rehabilitation 67

To be determined Institution Building 69

uI. suam- ARD CErNrL AsIu mCI (Cont!d)

cxxnnNr AD lYTql9gfiMT s 2DCKllXSCT*Y

To be determined Rehabilitation 16

wE LM_ATI

To be determined Oblast Industry Finance 83

Asency for International Portfolio Dev.lopment 85Cooperation and DeOelopment

Turkish Electricity Coal Pollution Abatesmut S8Authority (TEX)

3r. LAI A)XCA AUD CR A X

Seretartat of the Social Raform 93Presidency Technical Assistance

Fondo do Inversion Social Investent 96SocLal (PIS) Fund 8I

CoS-2 RXC

CajA Costarricense dol tealth/Sector Rofors 105Seguro Social (CCSS) andMinistry of UeAlth

TRIIDD & TAG

To be detormined Export Infrastructure 120and Development

V. _IDDLE BAST_AJD N=H AIICA ICE

Ministry of Planini Energy Sector 129AdJustmeLt (ESAL)

Office Uctional de Fifth Water Supply 1321'8au Potable (ONZP)Regius, and Owernment

TX. SU ASIA u=xOu

WRn SD DIPLTXI crnxz

Bengladeuh Bank Private S;ctor 136Industrial

National Thore l Powr Wm Power 143Corporation (NTPC) GCnPration I

MONTHLY OPERATICNAL SUMMARY

ANNEX I

As explained in "Information about the Environmental AssessmentProcess," environmental classifications for all projects are included in the

Monthly Operational Summary evdry month. This quarterly annex contains:

o For Category A projects, the environmental data sheet containing

information about the issues and schedule of the environmental

assessment process;

o For Category B projects, a header showing project status.

o For projects in Categories C and T ("to be determined"), a listing

of project names and identification numbers.

Structural and sectoral adjustment loans listed in the main text are not

included because they do not fall within one of the above three categories for

purposes of the directive governing environmental assessment.

Environmental data sheets for projects in categories other than A have

not been reproduced here because of the volume involved, but are available to

the public on request. Any request should identify the data sheets desired by

project name and identification number (e.g., 3AFRPAOOO). Request for a data

sheet may be made by writing:

Environmental Data SheetsEnvironment DepartmentRoom S-5143World Bank1818 H Street, N.W.Washington, DC 20433USA

or by telephoning 1-202-473-1370 and leaving a message.

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :C.A.R. Project ID No: 3CARPA036Project :National Livestock Development IIAppraisal Date : November 01, 1993 IBRD Amount ($m): 0.00Board Date : July 19, 1994 IDA Amount ($m): 24.00Managing Division :AFlAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Sept. 30, 1993Date EA Category Assigned: Aug. 28, 1993

MAJOR PROJECT COMPONENTS:

(1) Policy, legislation and administrative reforms; (2) developmentalinvestments by private and public entities for the (a) management of pastureresources; {b) institutional strengthening; (c) rural credit; (d) protectionof fauna in eastern areas; and (e) strengthening animal research.

MAJOR ENVIRONMENTAL ISSUES:

Protection of fauna and management of pasture resources.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Establishment of 23 ZAGROP (agropastoral development areas) to helpherders adopt conservative pasture management practices. Relocation ofcommercial cattle route away from game reserves. Improvement of wild lifemanagement with village participation in buffer zone exclusively dedicated towildlife.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Livestock development still at 15% of estimated potential and projectfocussing on addressing potential impact on resources and wildlife.

REPORTING SCHEDULE:

Draft start up 08/29/93; expected 09/30/93. Completed and approved.

REMARKS:

None.

I-2

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : EQ. GUINEA Project ID No: 3EQGPA014Project :Natural Resource Management and ConservationAppraisal Date : March 31, 1994 IBRD Amount ($m): 0.00Board Date : June 27, 1995 IDA Amount ($m): 10.00Managing Division : AFlAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned: Mar. 25, 1992

MAJOR PROJECT COMPONENTS:

The project's overall objective would be to assist the Government toimplement a national natural resource management plan in order to assure bothan optimal production level from the forest and conservation of theenvironment. In support of the above objectives, the project would includethe following components: (a) preparation and implementation of a naturalresource management program; (b) conservation and management of naturalforests; (c) establishment and management of protected and multiple useareas; and (d) institutional strengthening of the Ministry of Agriculture andForestry.

MAJOR ENVIRONMENTAL ISSUES:

Establishment of sound environmental practices is a major focus of theproject.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Still to be determined.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

According to the OD 4.01 guideline, this project is under Category A.

REPORTING SCHEDULE:

Separate EA is required. EA will be prepared with technical supportfrom Norway Consultant Trust Fund.

REMARKS:

The following studies were undertaken under a Japanese Grant: (a)environmental impact of forestry exploitation on the Island of Bioko; (b)pilot community forestry program. The Norwegian Trust Fund is scheduled tofinance the following studies: (a) review of concessions policy, forest fees

and taxes; (b) review of foresty and environmental protection policy; (c)review of proposed integrated management area in Rio Muni; and (d)environmental assessment.

1-3

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : EQ. GUINEA Project ID No: 3EQGPA022Project : Energy IAppraisal Date : February 01, 1994 IBRD Amount ($m):Board Date : December 06, 1994 IDA Amount (Sm): 10.00Managing Division : AFIIE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: January 1994Date EA Category Assigned: October 22, 1994

MAJOR PROJECT COMPONENTS:

(a) Construction of a thermal power plant to replace the eixstingdiesel plant. The new thermal plant will run on gas from the Alba oil field.Presently the gas from the Alba field is being flared.

(b) Rehabilitation of existing hydroelectric plants and othercomponents of the power system.

(c) Implementation of the recommendation of the EA study for the Albaoil field.

(d) Technical assistance, training and studies leading to thestrengthening of the energy sector.

MAJOR ENVIRONMENTAL ISSUES:

The gas thermal plant should have a positive environmental impact.This however will be examined by the ongoing EA study.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

The ongoing EA study for the Alba oil field will be expanded to includethe impact of the gas thermal plant. The whole study will also beaccelerated so that the report will be ready prior to appraisal departure.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The project is classified as a Category "A" because it involves theconstruction of a thermal power plant.

REPORTING SCHEDULE:

Ongoing study for the EA for the Alba field will be expanded to includethe environmental impact of the thermal power plant.

REMARKS:

None.

1-4

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : ETHIOPIA Project ID No: 3ETHPA102

Project : Calub Gas DevelopmentAppraisal Date : December 01, 1992 IBRD Amount (Sm): 0.00Board Date :February 15, 1994 IDA Amount ($m): 83.00

Managing Division :AF2EI Sector: Mining & other Extractive

Lending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: Jan. 10, 1993Date EA Category Assigned: Oct. 21, 1992

MAJOR PROJECT COMPONENTS:

Supply liquid petroleum products; supply LPG for the interfuelsubstitutions with fuelwood; and regional development of the Ogaden through

road rehabilitation and community development.

MAJOR ENVIRONMENTAL ISSUES:

Beneficial environmental impact deriving from the fact that overall

project will reduce demand for charcoal and fuelwood, thus mitigating current

dramatic deforestation rate. Installation of a gas extraction plant and

rehabilitation of the associated road may have impact on local population's

lifestyle and economies.

OTHER ENVIRONMENTAL ISSUES:

Extraction/separation technology will be designed to prevent

hydrocarbon emissions and effluent.

PROPOSED ACTIONS:

Establishment of an Environmental Monitoring System (EMS), Community

Development Fund (CDF) and adoption of suitable engineering design and

technology. The CDP and EMS are designed to maximize a participatory

approach to regional development.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Initial classification has been changed from B to A upon advice of

AFTEN due to inclusion of road rehabilitation and possible social/economic

impact within the project area.

REPORTING SCHEDULE:

EA first draft: November 10, 1992.EA final draft: January 10, 1993.EA final report: March 1993.

REMARKS:

Contacted UN Agencies, NBOs, and leaders of Somali communities in

Ogaden. Participatory approach emphasized.

I-5

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :GAMBIA Project ID No: 3GAMPA030Project : Urban EnvironmentAppraisal Date :July 05, 1994 IBRD Amount ($m): 0.00Board Date : July 11, 1995 IDA Amount (Sm): 10.00Managing Division : AF5IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: March 1994Date EA Category Assigned: Mar. 23, 1993

MAJOR PROJECT COMPONENTS:

(a) Civil works aimed at drainage, sanitation, road construction andrehabilitation; (b) institutional strengthening of the Ministry of LocalGovernment and Lands; (c) institutional strengthening of the Ministry ofTourism to control squatting; (d) implementation of the new Housing Policyto enhance land development and housing finance functions.

MAJOR ENVIRONMENTAL ISSUES:

As this project aims at effective management and control of the touristdevelopment area, it could have a potential impact on the people currentlyliving in the area.

OTHER ENVIRONMENTAL ISSUES:

Some smaller-scale civil works will be undertaken.

PROPOSED ACTIONS:

An Environment Mangement Study is being carried out under a PPF, butthe results are not yet available. In many ways, this project will improvethe urban environment by improving primary infrastructure, drainage and solidwaste disposal.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Projects with resettlement issues are categorized as "A" projects in OD4.01, Annex E.

REPORTING SCHEDULE:

Environment Management Study is planned and the initial findingsshould be available in March 1994.

REMARKS:

None.

I-6

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : GAMBIA Project ID No: 3GAMPA031

Project : Banjul Port IIIAppraisal Date : February 14, 1994 IBRD Amount ($m):

Board Date : August 16, 1994 IDA Amount (Sm): 8.00

Managing Division : AF5IN Sector: TransportationLending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: January 1994Date EA Category Assigned: Mar. 23, 1993

MAJOR PROJECT COMPONENTS:

(a) Lengthening the New Banjul Jetty by about 180 metors; (b) clearing,

paving and fencing of about 16,000 sq. m. for storage of containers; (c)building of a container freight station and office space in the new container

yard; (d) resurfacing and fencing of the road connecting the new yard and the

existing port; (e) acquisition of a combined dredger-buoy tender vessel and

replacement of the 1000 HP tug and a mooring launch; and (f) capacity

building at the Gambia Port Authority.

MAJOR ENVIRONMENTAL ISSUES:

There is one major environmental issue associated with this project:

the port rehabilitation, the environmental impact of which may be connected

with the issue of possible increased siltation.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

The master plan for the port will require a small unit to remove waste

and keep the area clean to prevent pollution. Water pollution caused by fuel

residues and ship sewage is being studied during preparation to identify a

package of mitigating measures. Studies are being carried out prior to

project design to mitigate the siltation impacts of the new berth

construction.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Port and harbor development projects are classified as category "A"

under OD 4.01, Annex E classification.

REPORTING SCHEDULE:

The environment assessment, which is currently underway, is being

financed by the Canadian Environmental Trust Fund. The report is expected at

the end of January 1994.

REMARKS:

None.

I-7

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country GHANA Project ID No: 3GHAPA094Project s Power VIIAppraisal Date : June 30, 1993 IBRD Amount ($m): 0.00Board Date :February 15, 1994 IDA Amount ($m): 100.00Managing Division : AF4IE Sector: Mining & other ExtractiveLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: August 1993Date EA Category Assigned: Aug. 30, 1993

MAJOR PROJECT COMPONENTS:

Provisions of additional thermal capacity to complement hydro power andmeet load growth; additional transmission lines and sub-stations to takeelectricity to load centers, technical assistance for engineering,construction supervision, operations, demand-side management, institutionalbuilding and regulatory issues.

MAJOR ENVIRONMENTAL ISSUES:

The power station will have environmental impacts, but mitigative. Themains issues are: (i) the effect of the cooling water on marine life and theconsequent effects on the fishing industry near the site of the project andneighboring villages; (ii) air quality impacts, i.e., NOX emissions; (iii)the effects of loss of site land on families who currently practicesubsistence-level agricutlure on the land; and (iv) potential oil spillageand/or leakage of oil.

OTHER ENVIRONMENTAL ISSUES:

Noise level.

PROPOSED ACTIONS:

The main mitigating plans are: (i) limit the temperature increase ofdischarge water to a level such that no measurable damage is expected; (ii)water interjection technology in the combustion turbine burner will be used tocontrol NOx emissions to international standards; (iii) a comprehenstion planwill be implemented to assist people-affected subsistence for lost farmland;(iv) noise reduction has been taken into consideration in the definition ofthe conceptual design and layout of the power plant; and (v) a monitoringplan to determine adequateness of mitigating measures and to develop futuremitigation requirements should the need arise.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Potential environmental risks have been taken into consideration inthe classification. Mitigation measures are incorporated in power plantdesign and meet international emissions standards.

REPORTING SCHEDULE:

Final draft of the EA, dated August 1993, is available for review.

1-8

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

REMARKS:

The project category is being changed from "B" to "A" because of thepotential risk to the fishing industry. Consultations have been carried outand are ongoing with affected groups. The borrower has made the EA reportavailable to the general public and local NGOs, and has given permission toIDA to release the EA for public review. The borrower is organizingadditional meetings with local groups and NGO. to discuss the findings of theEA.

1-9

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : GHANA Project ID No: 3GHAPA134Project : Small-Scale MiningAppraisal Date : April 01, 1994 IBRD Amount ($m):Board Date : May 02, 1995 IDA Amount (Sm): 16.00Managing Division : AF4IZ Sector: Mining & other ExtractiveLending Instrument: Specific InvestMent Loan Status: LendingDate for receipt of EA by Bank: N/ADate EA Category Assigned: December 2, 1993

MAJOR PROJECT COMPONENTS:

Introduction of improved mining and processing techniques fordevelopment of small-scale mining; introduction of environmental proceduresand land reclamation practices; institutional strengthening of key sectoragencies, including environmental management, monitoring and evaluation.

MAJOR ENVIRONMENTAL ISSUES:

Improved techniques for small-scale mining may have an environmentalimpact. However, the techniques introduced will be environmentallyresponsive and procedures for land reclamation will be introduced.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

The process and techniques to be introduced for small-scale miningdevelopment will be environmentally responsible. Land reclamation practiceswill be introduced. Alternate techniques will be tested on an ongoing basis.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Project has a specific environmental component. Setting upenvironmental managing capacity in sectoral agencies and introducingenvironmental practices and procedures are specific components of theproject.

REPORTING SCHEDULE:

Terms of reference for EA are being developed. EA to commence inFebruary 1994. First draft expected April 30, 1994.

REMARKS:

Social and Economic Impact of Small-Scale Mining completed.Environmental Impact of Small-Scale Mining in Ghana completed by NSRConsultants.

1-10

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :GUINEA BIS. Project ID No: 3GUBPA035

Project : Agricultural Land and Environmental Managememt

Appraisal Date : June 07, 1993 IBRD Amount ($m): 0.00

Board Date : May 24, 1994 IDA Amount (Sm): 8.00

Managing Division : AF5AG Sector: Agriculture

Lending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: December 1993Date EA Category Assigned: Aug. 1993

MAJOR PROJECT COMPONENTS:

Strengthening public sector institutions for promoting environmentally

sound land use policies and management. Components include: pilot community

based land management program, strengthening department of Forestry

of the Ministry of Rural Development and Agriculture, preparation of forest

inventory and management plan, establishment of a National Geographic and

Cadastre Institute, strengthening of a Natural Environmental Council, and

project management support.

MAJOR ENVIRONMENTAL ISSUES:

Project objectives seek to enhance environmental protection. Potential

risks include the possibility of further forest destruction if local

management capacity proves to be inadequate.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

Activities under the pilot program would be given an independent

environmental review to ensure that possible negative environmental impacts

would be met with corresponding mitigation measures. An independent

biological inventory and environmental survey would also be undertaken as

part of the Forest Inventory and Management Plan.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The environmental category is "A" because of the possible risks

associated with the pilot community program and the forestry component.

REPORTING SCHEDULE:

EA complete by end-December 1993.

REMARKS:

Borrower has prepared a National Environmental Action Plan, and a

Tropical Forestry Action Plan with IDA's assistance.

ENVIRONMENTAL DATA SHEET FOR,CATEGORY "A" PROJECTS

Country : GUINEA Project ID No: 3GUIPAOS5Project : Rural Resources ManagementAppraisal Date : May 26, 1994 IBRD Amount ($m): 0.00Board Date : April 25, 1995 IDA Amount ($m): 12.70Managing Division : AFIAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: December 1993Date EA Category Assigned: March 1992

MAJOR PROJECT COMPONENTS:

Conservation of forests, rural development of buffer zones.

MAJOR ENVIRONMENTAL ISSUES:

To be determined.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

To be determined.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

All forest projects are environmentally sensitive.

REPORTING SCHEDULE:

EA is with Regional Environment Division.

REMARKS:

EA consultant, Mr. Bertran de la Farge, worked closely with the NGO"Guinee Ecologie".

I-12

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :COTE DIVOIRE Project ID No: 3IVCPAO9l

Project : Private Sector EnergyAppraisal Date : January 10, 1994 IBRD Amount ($m): 30.00Board Date :May 17, 1994 IDA Amount ($m): 0.00

Managing Division : AFlIE Sector: Power

Lending Instrument: Sector Investment and Maintenance Status: Lending

Date for receipt of EA by Bank: Oct. 1992Date EA Category Assigned: Nov. 4, 1992

MAJOR PROJECT COMPONENTS:

Development of offshore gas field; offshore platform; sub-sea gaspipeline; gas treatment plant; conversion of existing thermal electricity

generating facilities to natural gas; installation of new gas turbines.

MAJOR ENVIRONMENTAL ISSUES:'

Positive global environment impact of the energy sector by moving away

from liquid fuel and biomass to natural gas; diminution of air and water

pollution in the Abidjan area (reduction of C02 and NOx).

Major environmental issues concern risk of accidental gas leaks, fires

and explosions during operation of the facilities.

OTHER ENVIRONMENTAL ISSUES:

Other environmental issues concern possible soil erosion and

pollution; possible pollution of marine environment during drilling and

operation of the development wells (release of oily water, chlorine and

toxicant; discharge of sewage, drilling mud and cuttings).

PROPOSED ACTIONS:

1. Human environment: The elimination of major safety risks requires the

following measures: (i) use of oils that do not develop PCB when burning; (ii)

installation of effective gas and fire detection systems and fire fighting

systems; (iii) installation of an emergency shut-down system to isolate gas

leakage areas; (iv) use of wellhead safety valves blowout preventors and

choke/kill valves to prevent gas leaks during drilling operations; (v)

installation of an emergency power generation system; (vi) prepartion of an

efficient evacuation system; and (vii) definition of clear procedures for

maintenance operations.

2. Marine environment: The most important measures to be taken are as

follows: (i) treatment by multi-stage preparation of all oily waters; (ii)

neutralization of all waters violating pH-limits; (iii) solids to be ground

when discharging sewage, to promote their dispersion; (iv) sewage water from

the onshore plants to be led to the municipal sewage system; (v) all kind of

offshore dumping are prohibited; (vi) water based or non-toxic mud to

be used in drilling operations; (vii) sub-sea pipeline to be safely covered

or buried with a cathodic protection; and (viii) safety basins for glycol and

oil tanks to be installed.

1-13

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

3. Terrestrial environment: Realization of a collection system foroverflows and spillage and control of the disposal of chemical containers,oil barrels, etc. to avoid pollution of soil, ground and surface water.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The environmental category "A"l selected is mainly due to the type ofproject proposed (gas development) and the existing resettlement issue.

REPORTING SCHEDULE:

A first EA was prepared in October 1992 by the consulting firmsSoil and Water Ltd and Ekono from Finland, and under an AfDB funding.The Bank reviewed this report and led the conclusion that this report wouldnot meet World Bank standards, because it did not adequately address theissue of possible resettlement of population on the sites of the gastreatment plant and the new power plant nor did it consult with the affectedpopulation. In the meantime, the project concept was modified to involvesites which do not affect local populations or other environmentallysensitive areas such as classified forests, and the project sponsors issued anew EA (dated February 1993) as a part of their contract. There was also apossibility that a nearby fishing community might be temporarily affected bythe project implementation and consultations were held by the EA team withthese populations. The Environmental Assessment is now acceptable to theBank and an Environmental Assessment Summary has been prepared.

REMARKS:

NGO consulted: Afrique Environmentale.

I-14

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :KENYA Project ID No: 3KENPA129

Project :Energy I

Appraisal Date :February 11, 1994 I8RD Amount ($m): 0.00

Board Date :June 30, 1994 IDA Amount ($m): 100.00

Managing Division : AF2EI Sector: Power

Lending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: To be determined

Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

Likely major components are: 2 x 32 MW geothermal power station;

75 MW diesels (or combustion turbines); Nairobi transmission system

strengthening; Rural electrification; 70 MW hydroelectric station;

Petroleum Pipeline Rehabilitation.

MAJOR ENVIRONMENTAL ISSUES:

Impact of geothermal power station, hydroelectric station, and

transmission line.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

Under discussion with Government.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

REPORTING SCHEDULE:

Under discussion with Government.

REMARKS:

None.

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : MAURITANIA Project ID No: 3MTAPA049Project : Irrigation PromotionAppraisal Date : May 01, 1994 IBRD Amount ($m): 0.00Board Date : July 11, 1995 IDA Amount ($m): 17.00Managing Division : AF5AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned:

MAJOR PROJECT COMPONENTS:

Development of private irrigation plus selected rehabilitation ofpublicly constructed schemes.

MAJOR ENVIRONMENTAL ISSUES:

Not yet identified.

OTHER ENVIRONMENTAL ISSUES:N/A

PROPOSED ACTIONS:

Not yet identified.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:Large scale irrigation projects are Category A under guidelines in

OD 4.01.

REPORTING SCHEDULE:

Not yet started.

REMARKS:

Project preparation scheduled to start in mid-1992.

1-16

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :NIGERIA Project ID Nos 3NIRPA136

Project : Forestry III

Appraisal Date : January 15, 1994 IBRD Amount ($m): 00.00Board Date : June 16, 1994 IDA Amount ($m): 40.00

Managing Division : AF4AG Sector: Agriculture

Lending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: January 10, 1994

Date EA Category Assigned: May 1992

MAJOR PROJECT COMPONENTS:

(i) On-farm and community-based social forestry and protective

afforestaion; (ii) pilot approaches to sustainable multiple-use management of

selected forest reserves; and (iii) institutional strengthening.

MAJOR ENVIRONMENTAL ISSUES:

Design, implementation and community involvement in multiple-use forest

reserve management.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

The project specifically aims to improve the rural environment by

improving the management of forest resources.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Forestry projects are A category projects.

REPORTING SCHEDULE:

EA start: October 15, 1993. Field work is in progress. Target date

for draft report is January 10, 1994.

REMARKS:

None.

I-17

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :NIGERIA Project ID No: 3NIRPA156Project : Flared Gas UtilizationAppraisal Date : June 28, 1993 IBRD Amount (Sm): 100.00Board Date : March 24, 1994 IDA Amount ($m): 0.00Managing Division :AF4IE Sector: PowerLending Instrument: Sector Investment and Maintenance Status: LendingDate for receipt of EA by Bank: Jan. 25, 1993Date EA Category Assigned: Mar. 30, 1993

MAJOR PROJECT COMPONENTS:

Gas gathering network; offshore platform; subsea gas pipeline; gastreatment plant; mooring system; TA. The LPG offshore storage vessel will beleased.

MAJOR ENVIRONMENTAL ISSUES:

Positive global and local environmental impact through reduction in gasflaring and switching from liquid to gaseous fuels for power generation.

Major environmental issues at construction phase concern removal ofvegetation for construction; potential contamination of surface water andcreation of Right-of-Ways (ROWs). Issues at operational phase concern safetyof operations; potential effluent discharges; and impact on local fisheries.

OTHER ENVIRONMENTAL ISSUES:

Other environmental issues concern possible chronic pollution, coastalerosion and the effect on local communities.

PROPOSED ACTIONS:

1. During Construction Onland: (i) project design to minimizevegetation clearing and avoid significant virgin habitats; (ii) installationof pollution control devices; (iii) construction procedures to minimize leaksand spills and treatment of sanitary wastes; (iv) choosing ROWs to avoidsensitive habitats and human dwellings; (v) protection and management plansfor sensitive habitats; (vi) pipelines routed to avoid sensitive habitats;(vii) use of mufflers on diesel equipment; and (viii) phasing of constructionactivities.

2. During Construction Offshore: (i) installation of solid wastedisposal facilities; (ii) use of pre-packaged equipment to avoid bottom-disturbing activities; (iii) pipeline construction planning around Okan andMefa platforms; (iv) installation of pollution control devices to achieve 48ppm discharge limits for oil and grease; and (v) collection of baseline winddata for flare stack construction.

3. During Operation: (i) restriction of non-personnel movement andsettlement; (ii) LPG pipelines to be buried, with cathodic protection; (iii)contingency plan for accidental gas venting; (iv) scheduling increased trafficto minimize wildlife disturbance; (v) installation of waste and run-offhandling systems; (vi) minimizing pipeline corrosion by coating within fusion

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

bonded epoxy (FBE); (vii) marking locations of buried pipelines to prevent

accidents, installing alarms and maintaining safety procedures and

contingency plans; (viii) preparing an ocean floor resource inventory to be

utilized in developing mitigation steps to resolve resource conflicts; (ix)

marking traffic routes for shipping vessels to minimize boat accidents; (x)

painting offshore installations in a gray color to improve their visual

impact and identification.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Major gas flaring reduction project with both marine and land gas

pipelines. Potentially diverse and adverse impacts on the environment may

occur.

REPORTING SCHEDULE:

A preliminary EA report was issued in Nov. 1992 and was reviewed

within the Bank. The revised report was received in May 1993 and was reviewed

by the team's environmentalist/sociologist during a mission to the project's

site. Guidelines for an environmental mitigation plan were submitted by the

Bank to the project sponsors and the plan is under preparation by the

sponsor.

REMARKS:

None.

I-19

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : NIGERIA Project ID No: 3NIRPA158Project : Irrigation DevelopmentAppraisal Date : April 15, 1994 IBRD Amount ($m): 100.00Board Date : March 14, 1995 IDA Amount ($m): 50.00Managing Division : AF4AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: N/ADate EA Category Assigned: June 2, 1993

MAJOR PROJECT COMPONENTS:

(a) Small-scale irrigation development using low cost pumps for waterlifting from shallow aquifers and surface sources;-(b) technical assistance toimprove operation and management of irrigation facilities, and improve thecapacity of federal and state governments in policy formulation and irrigationdevelopment planning; and (c) assistance for legal and institutional reformsand for the strengthening of farmer groups and other private organizationsfor more effective investment and management in irrigated agriculture.

MAJOR ENVIRONMENTAL ISSUES: ''

Health hazards and potential effect on hydrological cycle and flora andfauna.

OTHER ENVIRONMENTAL ISSUES:

Use of inappropriate chemicals or practices in irrigated farm lands.

PROPOSED ACTIONS:

Environmental impact studies are being undertaken. An independentreport on dam safety will be prepared. Measures to mitigate undesirableimpact would be determined after completion of the studies.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:'

Involves utilization of dams and reservoirs and open water courses.

REPORTING SCHEDULE:

Environmental Assessment in progress.

REMARKS:

None.

1-20

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :SENEGAL Project ID No: 3SENPA095

Project :Urban IVAppraisal Date :May 10, 1994 IBRD Amount ($m): 0.00

Board Date : December 20, 1994 IDA Amount (Sm): 35.00

Managing Division : AFSIN Sector: Urban

Lending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: September 1993

Date EA Category Assigned: Nov. 27, 1991

MAJOR PROJECT COMPONENTS:

There are three main components: (a) institutional development on both

central and local government levels; (b) physical investments encompassing

public infrastracture and facilities; and (c) project management for

recurrent costs.

MAJOR ENVIRONMENTAL ISSUES:

The situation of environmentally dangerous living conditions and the

low quality of public services, principally of housing, water and sanitation.

OTHER ENVIRONMENTAL ISSUES:

Industrial hazards and uncontrolled pollution usually in the Cap Vert

Peninsula.

PROPOSED ACTIONS:

Sectoral environmental assessment study (diagnostic of the sector) has

been completed. The final draft report should be sent to the Bank by

mid-December 1993.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The project is an "A" because a number of similar development activities

with potentially cumulative impacts are planned for a variety of specific

"city projects". The sectoral study not only assesses the direct

environmental impact of the project but also focussess on identifying a

methodology which will be followed for evaluating the impact of specific

subprojects during project implementation.

REPORTING SCHEDULE:EA start-up date, January 1993; first draft, September 1993.

The consultant has carried out work (data collection, analysis, town

meetings) for the study and agreement will be sought from Government on the

integration of the proposed methodology in the project design. The final

report will be submitted to IDA by December 1993. The findings of the urban

environment sector study will be included in the urban environment project

to be appraised in June 1994.

REMARKS:None.

1-21

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :CHINA Project ID No: 4CHAPA097Project : National HighwayAppraisal Date : June 29, 1993 IBRD Amount (Sm): 380.00Board Date : March 29, 1994 IDA Amount ($m): 0.00Managing Division : EA2TP Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: March/April 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(a) Construction of a new national highway 107 south of Shijiazhuangover 216 km in Hebei province and 124 km in Henan Province. The proposed newroad will be designed to expressway standards (4 lanes) with full accesscontrol; (b) upgrading/reconstructing sections of the provincial roadsinterconnecting and feeding traffic to the proposed expressway at majorintersections; (c) strengthening Hebei and Henan's expressway coordinationand facilitation of interprovincial traffic; and (d) improving the capabilityof the Hebei and Henan provincial Communications Departments to plan,design and implement its highway programs, and to initiate and manage theconstruction of the proposed expressway, through the provision of equipment,training and technical assistance. A study of highway capacity will bejointly underaken by Hebei and Henan provinces under the project.

MAJOR ENVIRONMENTAL ISSUES:

The Environmental Assessment for the Hebei Province section of theHebei/Henan Expressway has been submitted to, and reviewed by, the Bank andfound generally satisfactory. The EA identified the major water, air quality,noise and social issues likely to result during construction and operationof the expressway. The EA included public consultation. The most importantenvironmental problems likely to result from the expressway were found torelate to air quality impacts from vehicle exhaust emissions nd vehiclenoise during expressway operation. Although only about 40 families wouldneed resettlement from the proposed expressway right-of-way, there are alarge number of farmers that will need to be reallocated land because of theproject. The Hebei draft EA? and RAP have also been received and reviewed bythe Bank and found satisfactory. A final, correctly translated EAP and RAPwill be made available by the end of Sepember 1993. For the Henan provincesection for which the environmental studies began 8 months later than Hebei,the corresponding environmental documents have been received in first draftand the appraisal mission provided extensive comments. Revised documentsincluding RAP will be submitted to the Bank by 09/30/93.

OTHER ENVIRONMENTAL ISSUES:

The National Highway Project involves work in two provinces, and twoBAs, EAPs and RAPs were required. There was a need to coordinateenvironmental and resettlement work so that impact management andcompensation are handled in a consistent manner. The environmentalconsultants and Provincial Highway Authority resettlement groups of Henan andHebei coordinated their work to standardize the EAs, EAPs and RAPs.

I-22

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

PROPOSED ACTIONS:

The revised Henan EA is to include additional field survey of possible

undiscoverd archeological relic sites within and adjacent to the expressway

right-of-way. The recent changes and modification to the interconnecting

roads component of the project, location of interchanges, and minor

alterations to expressway design are also to be evaluated in the final EA

or EAP submitted to the Bank at the end of September 1993. Responses to Bank

questions on the RAP will also be submitted then.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

This project is similar to others in China already submitted to the

Board or in advanced stages of preparation. Good examples of issues and

solutions already exist.

REPORTING SCHEDULE:

The preliminary draft EA, EAP and RAP for Hebei were submitted to the

Bank in March/April 1993. The Provincial Environmental Protection Bureau and

the Ministry of Communications have met with the Highway Administration

Authority and reviewed the draft EA. After comments made during this meeting

are incorporated into the EA, it will be submitted to the National

Environmental Protection Bureau for approval. Final versions of the Hebei

reports are expected in the Bank September 30, 1993. The Henan reports were

reviewed in draft and comments were provided by the appraisal mission. Final

drafts are due at the Bank September 30, 1993.

REMARKS:

None.

1-23

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA156Project :Xiaolangdi Multipurpose DamAppraisal Date :April 23, 1993 IBRD Amount ($m)s 475.00Board Date :March 15, 1994 IDA Amount ($m): 100.00Managing Division :EA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: March 15, 1993Date EA Category Assigned: First Qtr 1991

MAJOR PROJECT COMPONENTS:

(a) Construction of a rockfill dam 154 m high, 1370 m crest length and49 mcm of fill; (b) construction of a hydropower station with total capacityof 1800 MW; (c) environmental management support; and (d) training andtechnical assistance for implementation and financial management, corporateplanning and personnel management.

MAJOR ENVIRONMENTAL ISSUES:

The project will have very significant environmental benefits. Itwill protect about 100 million people from catastrophic floods; increasethe water supply for cities of about 15 million people; reduce unsustainablenatural sediment deposition in the lower reaches of the river; firm upirrigation for two million ha; and generate a portion of the peak powerneeds of Henan and China's central region. The major environmental issuerelates to the resettlement over a 18-year period of 171,000 people wholive in the reservoir area. Dams of this size generally have many othernegative impacts on downstream fisheries, water quality, health, etc.However, the Yellow River has the highest silt load in the world and henceriver ecology is very limited. With this dam, silt load will be effectivelymanaged, low flows will be increased, and water quality improved. Thedownstream drainage conditions will be improved by less periodic flooding.Hence the health effects downstream will improve and because of siltmanagement and increased low flows, the estuary and river fisheries shouldbe improved. Other potentially adverse environmental impacts of the dam'sconstruction and operation have been reviewed and those that could besignificant, such as waterborne diseases and erosion and sedimentation shouldbe avoided or offset by good implementation of the environmental managementplan.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

The Yellow River Conservancy Commission (YRCC) and the Henan andShanxi provinces have completed detailed planning of the resettlementcomponent for all relocatees below 180m level and has undertaken resettlementpreliminary designs for relocatees between 180m and 275m. YRCC and theprovinces have now had detailed agreements on sites for settlements andindustries to be created for all relocatees. The YRCC already spent Y65million to resettle about 4,500 people. The final resettlement plans have

I-24

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

been submitted to resettle the rest of the 10,000 people from the damsite

area by early 1994. An international environmental panel member reviewed in

October 1992 the draft environmental impact assessment (EAI) which was

originally prepare by YRCC and found it a comprehensive and satisfactory

treatment of all relevant issues. The environmental management plan costing

Y130 million will cover the coordinating role of monitoring and offsetting all

impacts during the construction and operation of the project.

The resettlement aspects of the project for the 171,000 additional people

requiring relocation due to the project are included under a separate

Xiaolangdi Resettlement project.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The project has been given an "All rating due to the resettlement

requirements and environmental impacts resulting from inundation.

REPORTING SCHEDULE:

A summary of the EIA was distributed to the Executive Directors on April

15, 1993.

The environmental management plan will ensure that all negative impacts

will be offset. It covers a wide range of monitoring and actions on

concerns including resettlement, protection of cultural relics, sanitation

and antiepidemic programs, sediment and water quality, management of

construction area, reservoir clearing and seismic monitoring. The resettlement

monitoring and close supervision will seek to ensure satisfactory phased

resettlement which depends on appropriate linkages with the construction

schedule, coordination between various resettlement offices and on the

implementation capacity of the local government agencies.

REMARKS:

Successful implementation of the resettlement project will be a condition

for disbursement against dam construction.

I-25

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :CHINA Project ID No: 4CHAPA157Project : Feed Industry DevelopmentAppraisal Date : September 23, 1994 IBRD Amount ($m): 100.00Board Date : May 02, 1995 IDA Amount (Sm): 50.00Managing Division :EA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: Sept. 23, 1994Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

The proposed project is complex and may comprise 23 subprojects undernine groups of feed industry disciplines, to be sponsored by 16 agencies in10 provinces and/or municipalities. The project would (a) support feedindustry development through management and technical training, upgrading ofequipment design institutes, improving industry research and development, andfeed quality assurance; (b) assist in alleviating critical feed additiveshortages including feed vitamins, feed minerals and synthetic amino acids;(c) increase high-protein feed supplies through oil seed detoxification andprocessing and the manufacture of high-protein feeds from converted agro-industrial byproducts and abattoir wastes; and (d) introduce pilot areas witha specialty feed mill infrastructure, integrated with intensified livestockproduction, processing and marketing.

MAJOR ENVIRONMENTAL ISSUES:

Several project components would impact positively on the environmentthrough the conversion into high-protein animal feeds of plant and animalwaste products/effluents from agro-industrial plants and abattoirs. Suchsubprojects would be located in the industrial zones surrounding largepopulation centers where waste product generation and effluent discharge aretypically heavy and concentrated, with the potential of causing significantenvironmental pollution. Existing government industry incentives to reducepollution through the installation/improvement of pollution control equipmentwould be incorporated into these components. Potential environmental impactsby other components could result from oil seed processing effluents as well aseffluents from the high-protein feed production and recovery facilities.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Based on the environmental assessment of project components requiringsuch action, participating executing agencies will incorporate in the designof each plant effluent treatment and pollution control systems, according toBank and Chinese directives. A real opportunity exists to incorporateexisting government industrial pollution control incentives into the project,thereby taking advantage of incentives offered whilst setting standards forthe single-cell protein production, animal product rendering and fermentationindustries. This would include effluent monitoring and pollution controlenforcement.

1-26

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

An environmental assessment of components with agro-industrial

activities will be required, and its nature and extent is being determined

during the first project preparation mission in December 1993, including

the appropriate specialists.

REMARKS:

These requirements have been conveyed to the executing agency, the

National Feed Industry Office under the Ministry of Agriculture. Individual

subprojects requiring environmental assessment have to be identified and

scheduled for assessment by the Chinese EPB and the Bank.

I-27

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA163Project : Shanghai-Zhejiang HighwayAppraisal Date :November 04, 1993 IBRD Amount (Sm): 270.00Board Date :July 12, 1994 IDA Amount ($m): 100.00Managing Division : EA2TP Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Jan. 1994Date EA Category Assigned: Feb. 9, 1993

MAJOR PROJECT COMPONENTS:

The project is expected to include components for (i) construction ofthe four lane divided, access controlled, Shanghai-Hangzhou Expressway (131kms); (ii) investment and technical assistance to improve safety in theShanghai-Hangzhou corridor after the opening of the expressway; (iii)TA and equipment to help modernize management and operations in the highwaysubsector.

MAJOR ENVIRONMENTAL ISSUES:

Along the alignment of the expressway these could include: pollutionfrom noise and vehicle emissions during both construction and operation, soilerosion due to improper construction planning, interference to existingdrainage and land use by embankments and borrow pits, resettlement ofpopulation, land acquisition, and possible damage to sites of specialecological, cultural and archeological significance. Diversion of traffic tothe new expressway will to some extent reduce air and noise pollution on theexisting highways in the corridor.

OTHER ENVIRONMENTAL ISSUES:

For the Shanghai-Hangzhou Expressway, soil erosion due to improperconstruction planning, possible contamination of embankments and borrowpits, resettlement of population, and land acquisition. Diversion of trafficto the new expressway will to some extent reduce air and noise pollution onthe existing highways in the corridor.

PROPOSED ACTIONS:

Environmental Action Plans and Resettlement Action Plans, withassociated implementation and monitoring procedures, are required to helpavoid or ameliorate environmental impacts.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

This project is similar to others in China with important implicationsfor environment and resettlement, which have been assigned an "A"classification, and which either have been submitted to the Board or are inadvanced stage of preparation. Good examples of issues and solutions exist.

REPORTING SCHEDULE:

EAs have been prepared for the Shanghai and Zhejiang sections of the

I-28

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Shanghai-Hangzhou Expressway and approved by the Chinese authorities; Bank

staff have commented and these comments are now under review in China.

Environmental Action Plans and Resettlement Action Plans for each section are

now in preparation based on guidance given by the July 1993 Bank appraisal

mission.

REMARKS:

The project was identified in late 1992 and pre-appraisal took place in

July 1993. The project will require land acquisition and resettlement.

I-29

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA190Project : Yangtze Basin Water ResourceAppraisal Date : June 20, 1994 IBRD Amount ($m): 60.00Board Date : March 07, 1995 IDA Amount ($m): 150.00Managing Division : EA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: May 15, 1994Date EA Category Assigned: July 1992

MAJOR PROJECT COMPONENTS-

Hubei Province - (a) dike rehabilitation, main drain improvements,pumping stations, and water control monitoring systems for 286,000 ha andrelocation of 5200 people; (b) completion and rehabilitation of canal systemsfor 278,000 ha; (c) aquaculture, fertilizer, and soil conservation; (d)irrigation district support; and (e) institutional development support.

Hunan Province - (a) technical support for an existing drainage systemcovering 250,000 ha; (b) construction of the Jiangya Multipurpose Damand 300 MW power plant, and resettlement of 12,000 people; (c) completion ofirrigation systems for 50,000 ha and relocation of 1500 people; (d) irrigationdistrict support; (e) Lishui Basin management support; and (f) institutionaldevelopment support.

Yangtze Water Resources Commission (YWRC) - (a) procurement andinstallation of equipment for flood forecasting and monitoring system in theupper and middle Yangtze, including telemetry rainfall and streamflowstations, groundetations for meteorological and communications satellites,microwave stations, and central data processing; and (b) institutionaldevelopment support.

MAJOR ENVIRONMENTAL ISSUES:

The project is in the early preparation stage, and an environmentalreconnaissance has been completed. Potential issues include: inundation ofthe forest of the Jiangya Reservoir and increased use and production ofagrochemicals. Some 12,000 people will require resettlement for the JiangyaReservoir; an additional 6,700 would have to make minor moves for canalconstruction in subprojects.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

An initial environmental reconnaissance was carried out in conjunctionwith the first preparation mission in April 1993. The reconnaissanceidentified environmental issues (Jiangya Dam and others), reviewedenvironmental work on the project to date, identified further environmentalanalysis needed for improved project design (if so indicated), andassessed the status of monitoring and mitigation plans. The environmentalreconnaissance helped specify work needed and work schedules for remaining

1-30

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

environmental work required for preparation. NEPA is involved. The

preparation mission also assessed the extent of resettlement required and

reviewed resettlement progress and plans. Draft EIA and Resettlement Plans

have been reviewed and revised versions are under preparation.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Potential impacts are significant, mainly for Jiangya Reservoir.

REPORTING SCHEDULE:

A draft Summary Environmental Report and Preliminary Impact Assessment

have been done by provincial authorities for Jiangya Reservoir and have been

translated into English and were reviewed. The environmental reconnaissance

identified further next steps and completion of the draft EA is under way.

The revised EA and Environmental Management and Monitoring Plan are due for

completion before pre-appraisal mission in February, 1994. Revised

Resettlement Plans for Jiangya Dam are also expected prior to pre-appraisal.

REMARKS:

Current government policy is to decentralize administrative authority

and financial responsibility down to the lowest levels -- counties,

townships, villages and ultimately individuals. This policy requires full

local consultation before lower levels will agree to accept financial

responsibility. NGOs have no role in China. Permission of the Borrower to

release the EA has yet to be requested.

1-31

ENVIRONMENTAL DATA SHEET FOR CATEGORY "AW PROJECTS

Country :CHINA Project ID No: 4CHAPA192Project :Liaoning EnvironmentAppraisal Date :November 14, 1993 IBRD Amount ($m)s 150.00Board Date :June 14, 1994 IDA Amount (Sm): 10.00Managing Division :EA2EU Sector: UrbanLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: Sep. 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(i) Strengthening of environmental institutional arrangements, planning,monitoring and control; (ii) wastewater and solid waste management, solidwaste and wastewater treatment, partially based on masterplans developed withoverseas TA; (iii) pilot environment fund, supported by clean technology andwater conservation measures; (iv) cultural heritage conservation program;(v) air pollution reduction measures in one city (Benxi); (vi) water supplyprotection and enhancement; and (vii) industrial pollution abatementto meet pretreatment standards.

MAJOR ENVIRONMENTAL ISSUES:

This province is a highly industrialized area of China with largescale primary industries of poor efficiency generating large volumes of airand water emissions and industrial waste. It is one of the most heavilypolluted areas of China, and highly urbanized. Because of the magnitude ofthe problems the project mainly seeks to address the most serious waterpollution, wastewater treatment and air pollution issues in five majorcities, and support interventions to reduce water consumption and wastewaterflows through adopting clean technology. A TA component would assistLiaoning to draw up a long-term strategy for dealing with the most seriousair pollution and other environmental problems in the province, which couldthen by funded under a follow-up environmental project.

OTHER ENVIRONMENTAL ISSUES:

Sanitary landfill systems for municipal solid waste disposal in Dalianand Anshan, and a marine outfall for effluent disposal will require carefuldesign.

PROPOSED ACTIONS:

Highest priority investments have been included in the project toaddress the problem of water pollution control in the cities located in upperreaches of the Hun river basin which gives rise to severe downstream effectson water resources, which are a critical supply source for the downstreamcities. Solid wastes are affecting both surface and ground water resourcesand are in urgent need of control; air pollution damage to public health inBenxi will be significantly reduced, and protection and conservationworks begun on unique cultural heritage assets.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

1-32

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Wastewater treatment systems and Bank support for landfill disposal.

REPORTING SCHEDULE:

Fully satisfactory EA prepared by local agencies assisted byinternational consultants in liason with NEPA, completed and submitted to

Bank September 1993. NEPA completing formal review, due end of October 1993.

REMARKS:

Control of toxic industrial effluent by means of industrial renovation

and pretreatment to meet pretreatment standards will be essential if these

combined domestic/industrial biological treatment facilities are to operate

successfully. Cost recovery for pollution control will also be an essential

feature of the project in order to provide an economic incentive to the

polluting industries to reduce pollution and water usage. Clean

technology initiatives to be included in project, supported with an

environment fund. Additional innovation of support for cultural heritage

conservation and protection would demonstrate leadership role in broad based

environmental program design and management.

I-33

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA203Project : Sichuan Gas Development & ConservationAppraisal Date : June 15, 1993 IBRD Amount ($m): 250.00Board Date :January 18, 1994 IDA Amount (Sm): 0.00Managing Division : EA2IE Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: June 1993Date EA Category Assigned: Feb. 13, 1992.

MAJOR PROJECT COMPONENTS:

The project would comprise: (a) gas production component: (i) gas fielddevelopment through the drilling of about 100 wells; infill-seismic surveyand interpretation; and construction of related surface facilities; and (ii)gas field stimulation and rehabilitation of wells; (b) rehabilitation of SPA'sgas transmission and distribution systems; (c) institution building componentto support project implementation, oil/gas sector restructuring as wellas national petroleum education.

MAJOR ENVIRONMENTAL ISSUES:

The proposed project would have significant environmental benefits:increased gas supply and utilization would reduce coal consumption, whichwould in turn reduce emissions of S02, C02, and particulates. In addition,reduced gas leakage in the transmission and distribution systems would reduceemissions of methane, a potent greenhouse gas. Nevertheless, various safetyand environmental considerations require special attention, includingtreatment and discharge of formation water, waste water from well drilling,gas production and utilization as well as safety concerns in the operation andmaintenance of gas pipelines. No resettlement is anticipated and the processfor compensating rural residents for the use of their fields for drilling hasbeen reviewed and found to be satisfactory.

OTHER ENVIRONMENTAL ISSUES:

The other environmental issues to be addressed through this project areworker safety and training, and the need for a risk assessment.

PROPOSED ACTIONS:

An international consultant was contracted to assist the Chineseauthorities in completing the prepration of the EA report. Further, variouspreinvestment studies have been carried out with the assistance ofinternational consultants, and the project design and implementation willconform with international engineering and safety standards as well as soundenvironmental practices.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

As the project would include components for well drilling, constructionworks for gas field operations as well as rehabilitation of gas pipelines, itis classified as a category "A" operation.

1-34

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A PROJECTS

REPORTING SCHEDULE:

Final EA Report was reviewed by the Bank prior to project appraisal and

found to conform to all Bank guidelines.

REMARKS:

Draft EA report has been reviewed and commented by ASTEN staff and

found satisfactory.

1-35

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA206Project : Xinjiang HighwayAppraisal Date : October 29, 1993 IBRD Amount ($m): 150.00Board Date : June 14, 1994 IDA Amount ($m): 0.00Managing Division : EA2TP Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: Dec. 1992Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(a) Construction of a new 285.6 km road between Turpan, Urumqi andDahuangshan (TUDH) of which 104.1 km would be 2 lanes and 181.5 km would be4 lanes. Land would be obtained for eventual 4-lane development for the fulllength of the road; (b) improvement to the connecting and crossing roads toTUDH; (c) institutional strengthening of some of Xinjiang CommunicationsDepartment units and other highway related training schools and institutes;(d) upgrading highway maintenance capabilities of XCD through training andprovision of equipment and undertaking a highway maintenance study; (e) studyof intercity passenger transport; (f) technical assistance (TA) forconstruction supe~rvision and staff training; and (g) a road safety componentto help reduce accidents in Xinjiang.

MAJOR ENVIRONMENTAL ISSUES:

The draft EA, EA summary and Resettlement Action Plan for the TUDH werediscussed by the Bank's Preappraisal Mission in April 1993. These documentsaddressed air, noise, and water pollution impacts, and impacts on culturalrelics that may result because of TUDH construction and operation. Thealignment was modified to avoid the ancient town of Wulaber, which has somearcheological significance. The Preappraisal Mission identified certainother impacts that may result that required additional assessment. Theseissues included impact on seasonal livestock migration betweenlowland and mountainous regions posed by TUDH between Urumqi and Dahuangshan(including impediments to Khazak traditional migratory herdsmen), additionalcultural relic surveys needed around Wulaber ancient site and along thenorthern and eastern sections of the TUDH, a social survey of residents losinghomes and/or farm land because of land acquisition for the TUDH, preparationof a construction traffic management plan, and presentation of a more detailedEnvironmental Action Plan.

OTHER ENVIRONMENTAL ISSUES:

The draft RAP indentities 524 farmers who will be affected by loss ofagricultural land and 188 households that will have to be resettled.

PROPOSED ACTIONS:

During the course of the EA, consultation with the affected people wascarried out. The EA, EA Executive Summary, EAP, and RAP should be revised toreflect recent design changes in TUDH, to include the interconnecting roadsand include four missing studies, namely (i) identification of migrationpatterns of Kazakh herders, and other livestock migration routes; (ii)

I-36

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

detailed cultural relics survey; (iii) construction traffic impact study; and

(iv) soical survey of people affected by resettlement or compensation for

land reallocation.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Due to potentially significant environmental impacts, the project was

classified as "A" project.

REPORTING SCHEDULE:

The Eco-Environment Research Institute of the Chinese Academy ofEnvironmental Science has been entrusted to carry out the EA for TUDH. The

draft final report was completed by the end of December 1992 and the Bank

received a copy of it together with the related Executive Summary in February

1993. This report was reviewed in Xinjiang during the project pre-appraisal

mission in April 1993. It was agreed that the EA, EAS, EAP and RAP would be

updated and expanded and resubmitted to the Bank by September 15, 1993.

A project Preparation Mission visited Urumqi in July 1993 to check

progress on the preparation of these documents. Work on these documents had

generally been completed and preliminary drafts made available to the Mission

for the Cultural Relics Survey, the Social Survey, the ConstructionManagement Plan, and the Livestock Migration Study. The mission reviewed

these documents and found them to be generally satisfactory. The updated EA,

EA Summary, Environmental Action Plan and Resettlement Action Plan were

received by the Bank in September 1993.

REMARKS:

Local people were consulted and an insignificant percentage of them

opposed TUDH. Local governments along TUDH were also involved in the EA

process and especially in resettlement issues.

I-37

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA225Project : Fertilizer RestructuringAppraisal Date * June 15, 1994 IBRD Amount ($m): 300.00Board Date :January 24, 1995 IDA Amount ($m):Managing Division : EA2IE Sector: Industrial/IDFLending Instrumentt Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: Jan. 31, 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

The proposed project would include four major components: (a) Yunfuphosphate development; (b) medium-sized plants rehabilitation; (c) smallenterprise transformation; and (d) TA, training and studies.

MAJOR ENVIRONMENTAL ISSUES:

Having realized the importance of chemical fertilizers for thedevelopment of its agricultural sector, China indulged in the 19S0s-1970s inestablishing an indigenous, mainly coal-based, fertilizer industry fullybased on local technology and currently comprising around 1,700 small- andmedium-sized plants producing nitrogen or phosphate fertilizers. Althoughtechnology for large-sized process and equipment has been transferred fromoverseas since the late 1970s, about 50% of China's nitrogen fertilizers andmore than 75%-of its phosphate fertilizers still come from its small- andmedium-sized plants.

As these plants are predominantly coal-based, use obsolete technologiesand predominantly produce low-grade highly volatile ammonium bicarbonate(ABC) or low-grade phosphatic products (single superphosphate, SSP, and fusedcalcium magnesium phosphate, CMP), their energy consumption and toxicemissions are excessive and they are a major contributor to China's highestranking in Asia's greenhouse gas emissions. Furthermore, China's lowstandards in the chemical processing of coal and mineral phosphates have ledto unacceptably high levels of toxic emissions (such as cyanides, phenols,aromatics and polycondensates, fluorine, S02, NOx, etc.) from the majority ofits small and medium-sized fertilizer plants.

An additional ecological burden is caused by the high dust emissionsfrom these plants.

OTHER ENVIRONMENTAL ISSUES:

The establishment of a large phosphate fertilizer complex at Yunfu,Guangdong province, proposed under this project, could cause a majorenvironmental issue if inadequate measures are taken to contain the emissionof fluorine, sulfuric acid mist and S02, and other toxic compounds into wastewater and the atmosphere. Additionally, adequate steps have to be taken forthe safe and adequate disposal of phospho-gypsum from the phosphoric acidplant.

PROPOSED ACTIONS:

I-38

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

(a) Strengthen the Office of Environmental Protection within the

Ministry of Chemical Industries in order to review and support environmental

tasks under this project through a TA component; (b) prepare a major

environmental section for the fertilizer sector study; (c) prepare regional

environmental sector studies in selected provinces to establish criteria for

screening existing plants for closure, retrofitting and/or expansion; (d)

strengthen the EA process to be in conformance with both World Bank and

Chinese standards, and (e) an EA in accordance with Government of China

regulations will be prepared for each new or retrofitted plant.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

EA requirement for the individual project components has been discussed

with MCI. TORs and action plan were prepared and agreed during the

Identification Mission which took place in March/April 1992.

REMARKS:

The proposed project would establish a major milestone in the

development of the Chinese fertilizer sector, as it addresses almost all

major current issues including environment and energy consumption, and would

assist in accelerating the restructuring and modernization of the fertilizer

industry. The project will have a major positive environmental impact on

the whole sector,by: (a) significantly reducing energy consumption and

environmental pollution in about 30 selected small-sized ABC (causing

significant ammonia and carbon dioxide emissions due to decomposition, high

transportation costs, very labor intensive) by high-grade urea (almost 3

times more concentrated); (b) significantly reducing energy consumption and

environmental pollution in about seven selected medium-sized nitrogen

fertilizer plants; (c) creating demonstration models for the modernization/

rehabilitation of a large number of similar plants in future; (d) providing

international expertise and technology for the proposed phosphate complex at

Yunfu to ensure high performance and emission standards commensurate with

international codes; and (e) institutional development to strengthen local

management, engineering and equipment manufacturing capabilities and create a

better awareness of environmental protection and to facilitate a higher

standard in preparing environmental impact assessments.

I-39

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :CHINA Project ID No: 4CHAPA235Project : Yangzhou Thermal PowerAppraisal Date : October 12, 1993 IBRD Amount ($m): 350.00Board Date : March 29, 1994 IDA Amount ($m):Managing Division : EA2IE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: May 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(a) Greenfield construction of a coal-fired thermal power station,consisting of (2) 600MW boilers (1200MW total) and all associated facilities;(b) construction of a 500 kV transmission line (about 30 km) andreinforcement of existing transmission network; (c) construction managementand engineering services; (d) development and adoption of an accountingsystem by JPEPC, based on international principles; and le) strengtheningJPEPC organization, planning and environmental management through technicalassistance, studies, training and monitoring equipment.

MAJOR ENVIRONMENTAL ISSUES:

(a) Air quality impacts from coal burning; (b) water pollution(thermal, chlorine) from cooling water discharges; (c) ash management,including ash pond related issues; (d) coal transport and on-site management;and (e) relocation of 1053 families at plant site, ash disposal site andalong transmission line right-of-way.

OTHER ENVIRONMENTAL ISSUES:

Impacts of air emissions (fluoride) on silkworm production in generalarea; occupational health and safety issues on-site; environmental and workersocial impacts on the local region during the construction phase.

PROPOSED ACTIONS:

An Environment Assessment Report (EAR) for the project was prepared byECEPDI in April 1993. The EAR has been approved by the EnvironmentalProtection Bureau of Jiangsu Province, MOEP and NAPA. The EAR has beenreviewed by the Bank, it is considered that all environmental aspects of theproject are satisfactorily addressed and in compliance with all environmentalpolices and procedures. A comprehensive mitigating plan and monitoring planfor air pollution, water pollution, coal transport and handling, ashmanagement and other related issues will be designed for implementation. Theproject will require acquisition of about 179 hectares of farmland andrelocation of 1,053 households, affecting about 4,500 people. The Bank hasreviewed the resettlement program and action plan which appear to besatisfactory.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

- A major (1200MW) coal-fired thermal power station; and- A grass roots (greenfield) operation, located in a semi-rural

I-40

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

agricultural area near the bank of the Yangtze River.

REPORTING SCHEDULE:

The Bank will be furnished with semi-annual and annual project progressreports.

REMARKS:The EA Executive Summary was submitted to the Executive Directors in

May 1993. Copies of the EA were made available to the affected populationthrough representatives of Yangzhou municipal government in Jiangsu.Permission to release the EA to the Executive Directors was obtained from theChinese government in April 1993.

I-41

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CHINA Project ID No: 4CHAPA236Project : Zhejiang Power DevelopmentAppraisal Date : February 11, 1994 IBRD Amount (Sm): 400.00Board Date : September 01, 1994 IDA Amount (Sm):Managing Division : EA2IE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: November 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:2x600 MW extension to Beilungang Power Plant, Wangjiamen co-generation

plant, 250 circuit km of 500 kV, and 400 km of 220 kV transmission lines,distribution reinforcement and rehabilitation.

MAJOR ENVIRONMENTAL ISSUES:

Power plants: Atmospheric emissions, ash disposal, thermal discharges,waste water discharges.

OTHER ENVIRONMENTAL ISSUES:

Transmission lines and other components will displace 5,420 people andacquire 97 ha of land. Noise emissions, radio interference, electromagneticradiation, aesthetics.

PROPOSED ACTIONS:

Beilungang: Siting of Beilungang in industrial/port area with high dilutionof thermal discharges. Emission control measures such that emissions and airquality conform to Bank guidelines. Provision for future addition of FGD incase of future change from currently planned low sulphur coal. Siting ofash pond over impermeable strata. Treatment of ash sluicing water and othereffluents.Wangjiamen: Similar to Beilungang but slightly higher sulfur content dealtwith by limestone addition to circulating fluidized bed boilers. Ashdisposal by truck in sealed containers.Transmission Line: Monitoring to confirm acceptable impacts. Revisedresettlement plan will be sent to the Bank by January 1994.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

REPORTING SCHEDULE:Draft EA's submitted to July 1993 mission. Comments were made by

mission specialist and ASTEN specialists. Revised drafts and resettlementplan to be prepared during October 1993 mission.

REMARKS:Community consultation agreed in principle with NEPA. Modalities to be

discussed during October mission. Resettlement consultation will conform todraft MOF guidelines. Exact modalities to be discussed during next mission.EMP and resettlement plan will be convenanted.

1-42

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :CHINA Project ID No: 4CHAPA238

Project : Xiaolangdi Resettlement

Appraisal Date : October 01, 1993 IBRD Amount ($m):

Board Date : March 15, 1994 IDA Amount (Sm): 110.00

Managing Division : EA2AG Sector: Agriculture

Lending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: Completed

Date EA Category Assigned: April 15, 1993

MAJOR PROJECT COMPONENTS:

The objective of the project is to restore and improve the livelihoods

of 171,000 resettlers and about 300,000 host population affected by

construction of the Xiaolangdi multipurpose dam, and to minimize the adverse

effects of social adjustment to their new environment. The project comprises

four major components:

(i) Housing and Infrastructure Reconstruction. This component will

consist of constructing 276 villages and 11 towns for the

resettlers. About 38,880 new houses will be built covering a floor

space of 3.8 million m2. A total of 1750 km of roads will be built.

Every village will be serviced with electricity requiring the

construction of 632 km of power lines and other facilities.

27 wharfs around the reservoir will be built and 132 ferries

procured. 524 km of telephone lines and broadcasting facilities

will be built;

(ii) Transfer of Relocatees. This component makes special provisions to

transfer all materials and personal belongings, factory machinery

and other goods from the present site to the new sites;

(iii) Livelihood Reestablishment, Supervision and Monitoring. For

agriculture 10,000 ha of land will be developed, of which about

6,000 will be irrigated. Reestablishment of factories, mines and

other enterprises includes reconstruction of existing factories and

mines, moving existing equipment, and constructing new production

types, and constructing new or expanding existing enterprises. A

total of 252 factories will be rebuilt and 84 additional factories

will be expanded or newly built to absorb resettlers. Included in

this component is a detailed monitoring, supervision and social

adjustment program for items (i), (ii) and (iii);

(iv) Planning, Design and Training. To support the project through

implementation a large planning, design and training component has

been included. This component allows for detailed design changes

and additional field investigation for the project as implementation

progresses. Included in this component is training for county

resettlement office staff to handle the large scale movement

starting in 1997.

MAJOR ENVIRONMENTAL ISSUES:

Because of its significance and sensitivity, resettlement is the most

I-43

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

complex, difficult and costly environmental problem associated with theconstruction of the Xiaolangdi Multipurpose Project. To ensure adequateplanning, funding and follow-up the resettlement component is now consideredfor separate IDA support under this project.

The two major issues regarding the social environment are that theaffected relocatee and host families will (a) not be disadvantaged by the damconstruction; and (ii) will share in the project benefits. For therelocatees in particular it will be of paramount importance that (i) theirlivelihoods will be reestablished in a new location where the house, yardand amenities will be at least as good as before; (ii) the families' newearning potential will be at least as good as before; and (iii) familyexpenses and losses encountered during the transition will be duly recognizedand compensated for. Furthermore, it has to be assured that a realistic andfair grievance and complaints system is established to provide fair andtimely relief to relocatees and hosts is provided.

Effects on the natural environment are expected to be marginal for theagricultural relocation component, since relocatees will move mainly toalready existing agricultural areas where they will be helped to improve soilfertility and moisture conservation. In addition, yield increase and cropdiversification will predominantly be achieved through an increase of theirrigated area. The proposed two small new irrigation schemes (Wenmengtanand' Houhe) will improve conditions on existing agricultural land, except foran area of about 3,500 ha, which will be created through warping of siltbanks inside the bed of the Yellow River. No adverse effects are expectedwith regard to wildlife and existing forests; in fact, some of poor andtotally bare land in the mountain areas will revert to production forest forerosion control, timber, fuel and fodder production. The relocated andreconstructed enterprises and mines will upgrade their productiontechnologies and will have to adhere to much stricter environmental standardscompared to the requirements in place during original construction.Archaelogical experts did not find evidence of any archaelogical relics whichwould be affected by the resettlement areas.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

The summary environmental review indicates adequate housing, housingamenities and external support facilities as well as equal earning potentialfor the affected population would be provided. Lost income will beadequately compensated. Host communities will benefit through the provisionof improved water supply, health clinics, roads and schools. Acceptance ofrelocatees by the host community is ensured through elaborate consultationand negotiation procedures. Relocation within the same ethnic group isguaranteed as well as relocation within the minimum feasible distance. Aproper grievance/complaints system has been established and resources forenvironmental monitoring according to an action plan to be agreed upon areprovided for. The resettlement plan is basically in compliance with the Bankrequirements on resettlement and environmental assessment, in fact exceeds it

I-44

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

in its detailed provision for the reestablishment of livelihoods. For

industrial subprojects assurances will be obtained that all relocated and new

industrial enterprises, mines, and extractive industries would fully comply

with relevant national air, noise, and liquid waste emission standards from

the time of start-up.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

A comprehensive environmental assessment has been prepared for the

resettlement component as part of the Xiaolangdi Multipurpose Project EA

(pp.44-74) submitted to the Board on April 15, 1993. A detailed action plan

was agreed with the borrower during appraisal in October 1993.

REMARKS:

Successful implementation of the resettlement project will be a

condition for disbursement against dam construction.

I-45

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDONESIA Project ID No: 4INSPA189Project :Semarang-Surakarta Urban DevelopmentAppraisal Date : October 15, 1993 IBRD Amount ($m): 165.00Board Date :April 12, 1994 IDA Amount ($m): 0.00Managing Division :EA3IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: September 3, 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(a) Improvements of urban infrastructure and services including watersupply, drainage, sanitation and sewerage, solid waste management, urbantransport, and KIP; and (b) supporting TA for implementation assistance,financial strengthening, and institutional development in the cities ofSemarang and Surakarta.

MAJOR ENVIRONMENTAL ISSUES:

The preliminary EAs had identified the following project elements asmajor environmental issues: (a) Semarang -- (i) solid waste landfill siteselection and development; (ii) first phase of sewage collection andtreatment system including sludge treatment facility; and (iii) landacquisition will affect about 953 households of which 790 households willneed to be resettled for the Kali Banger drain construction; (b) Surakarta --rehabilitation of existing sewerage schemes and construction of treatmentfacility. Detailed EA studies (ANDALs) have been carried out for these fourproject components, together with management and monitoring plans.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Finalize the resettlement plan which is being revised. During negotiations,seek confirmation that agreed resettlement plan and other mitigating andmanagement actions will be implemented and monitored. The EA and processplan specialist technical assistance during July/August 1993 produced anaction plan for short and medium term improvements of operation and sitemanagement of the Semarang landfill site.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The project was originally classified as "B", but later reclassified as "A"because of the resettlement of about 790 households. Potentially seriousenvironmental impacts had been identified, but the EA process generatedappropriate mitigation, management and monitoring actions and measures.

REPORTING SCHEDULE:

Environmental Assessment work was completed by Government in August1993 and cleared for release. The EA summary report was received by the Bank

I-46

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

on September 3, 1993 and forwarded to Secretary's. On October 14, 1993 the

EA Summary was circulated to the Executive Directors.

REMARKS:

The Semarang component has involuntary resettlement involving about

790 families, for which a resettlement plan was received by the Bank on

September 8, 1993. The affected people and local NGOs had been consulted and

were involved in the preparation of this resettlement plan which has been

formally endorsed by the Mayor of Semarang (the City of Semarang will be

responsible for its implementation). The plan was reviewed, discussed,

clarified and slightly amended during project appraisal in October/November

1993. It was agreed with Government during appraisal that the

recommendations of the resettlement plan and the summary of the EA will be

made available through suitable means to the public, and in particular to the

people affected by the project, prior to loan negotiations which are

tentatively scheduled for February 1994.

1-47

ENVIRONMENTAL DATA SHEET FOR CATEGORY A" PROJECTS

Country : INDONESIA Project-ID No: 4INSPA211Project : Outer Islands PowerAppraisal Date : November 11, 2993 IBRD Amount ($m): 190.00Board Date : March 15, 1994 IDA Amount <$m): 0.00Managing Division : EA3IE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Aug. 2, 1993Date EA Category Assigned: Sept. 15, 1993

MAJOR PROJECT COMPONENTS:

The project is expected to include construction of a mine-mouth thermalpower plant at Banjarmasin in South Kalimantan and a hydroelectric power plantat Besai in south Sumatra along with associated transmission facilities.

MAJOR ENVIRONMENTAL ISSUES:

For thermal power plant, the environmental issues would relate tocoal mining, coal storage, air and water pollutant discharges, thermalpollution and ash disposal. For hydroelectric power plant, the environmentalissues are land loss, health, plant and animal life, water quality, soilerosion of catchment area, downstream hydrology and aquatic life. About 129families will be affected due to land acquisition in the Besai project. Inaddition, 36 families will need to be resettled because of land acquisition,in the Banjarmasin project (power station, and access roads). Resettlementplans for the Besai and Banjarmasin projects have been prepared.

OTHER ENVIRONMENTAL ISSUES:

Drainage and restoration issues associated with coal mining, to bedeveloped by private contractor(s). There are insignificant issuesassociated with the power line right-of-way. Possible coal minereclamation with the ash generated by the mine-mouth plant.

PROPOSED ACTIONS:

Banjarmasin: PLN to submit by 15 December 1993 the EA Report for theoperational phase of the coal mines for review and acceptance. The EAReports in respect of Besai and Banjarmasin plants, as well as theResettlement Plans, are being reviewed by the Bank.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

This project involves some resettlement and will have gaseousemissions, liquid effluent discharges as well as solids disposal, for whichan "A" category is appropriate, and required by OD 4.01 for thermal and hydropower plants.

REPORTING SCHEDULE:

REMARKS:

1-48

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

As part of the EA process, PLN made a public presentation of the

investment components at Besai on 14 September 1993 and at Banjarmasin

on 23 October 1993, with NGOs participating and the public supporting

the construction of the projects.

I-49

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDONESIA Project ID No- 4INSPA220Project : Forestry IIIAppraisal Date : March 14, 1994 IBRD Amount ($m): 70.00Board Date : June 21, 1994 IDA Amount ($m): 0.00Managing Division : EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: March 1994'Date EA Category Assigned: September 9, 1993

MAJOR PROJECT COMPONENTS:

Institutional strengthening in forestry sector through human resourcesdevelopment; research and extension activities.

MAJOR ENVIRONMENTAL ISSUES-:

The major environmental project issues relate to sustainability offorest use in Indonesia. Activities under the project will be aimed atpromoting this objective, and the overall policy undertakings will becrucial: (a) pricing of the resource, so as to extract economic rent andpromote efficient and conservative use, is a concern: Government ofIndonesia will need'to agree to a phased escalation of log prices; (b)independent inspection of forest operations, to evaluate compliance withsustainability conditions and initiate actions to correct, will need to beimplemented. Government of Indonesia will need to agree to initiate anadequate procedure; (c) current practices in allocation of plantation landneed review, to ensure that effectively regenerating natural forest areas arenot compromised by such policies; and (d) more effort and commitment is neededto promote participation in forest management - for both conservation andproduction purposes - by communities living in or near forest areas.

OTHER ENVIRONMENTAL ISSUES:

The project will possibly include an extension of a research facilitywhich may need some attention, not only for the civil works intended(although these will be of small scale) but also to evaluate the relevanceof the research work intended for sustainability and forest conservation.It is expected that any impact on indigenous people would be positive.

PROPOSED ACTIONS:

The bulk of proposed actions revolve around obtaining thenecessary monitorable undertakings from Government of Indonesia to attain thepolicy and institutional reforms necessary to achieve the sustainability andparticipation objectives. With regard to indigenous people the project hasbegun the process of consultation with forest-dwelling and adjacentcommunities and their representatives on ways and means of improving theireffective participation in sustainable forest management. The intendedinvestment in independent inspection of forest operations would also protectthe interest of forest-dwelling communities.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

I-50

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

The project will enhance sustainable management of tropical moist

forest, and will have positive social impacts. Originally, the project was

assigned "B" status, because all the components involved are focussed

directly on positive measures directly related to the major objectives.

However, the project has recently been redesignated category "A" because of

the great importance assigned to preservation of tropical moist forests in

Bank policy, and the need to have a monitorable set of reforms predefined in

negotiations for achievement of the overriding environmental goals.

REPORTING SCHEDULE:

Since the redeslgnation as Category "Al' occurred recently, an

evaluation mission visited Indonesia in November to initiate work on an

environmental impact statement. Workshops and seminars have been held to

consult NGOs and private sector interest groups on the broad policy and

institutional objectives for the forestry sector. A "draft" report should be

available by March 1994.

REMARKS:

An extensive consultation process, particularly focussed on NGOs and

community groups, took place between September and November 1993: the

results of this process will be available to those responsible for the EA.

ENVIRONMENTAL DATA SHEET FOR CATEGORY NA" PROJECTS

Country :INDONESIA Project ID No: 4INSPA238Project : Integrated Swamps DevelopmentAppraisal Date :January 11, 1993 IBRD Amount ($m): 70.00Board Date : February 22, 1994 IDA Amount ($m): 0.00Managing Division :EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Nov. 30, 1992Date EA Category Assigned: June 1991

MAJOR PROJECT COMPONENTS:

The project, which would support second stage development of about 20existing swamp schemes in Jambi, Riau and West Kalimantan provinces, wouldcomprise 5 major components: (a) development and rehabilitation of drainage/irrigation infrastructure; (b) operation and maintenance (O&M) of irrigation/drainage infrastructure; (c) food, cash and tree crop development throughprovision of agricultural inputs and support services; (d) ruralinfrastructure improvement through construction and rehabilitation of roadsand navigation networks, and improving drinking water supply; (e) land titlingand certification; and (f) support for coastal zone land use management.

MAJOR ENVIRONMENTAL ISSUES:

Upgrading of hydraulic infrastructure has potential to increase acidityin canals, fragment wildlife habitat, cause localized over-drainage andchange tidal patterns; any increased use of agro-chemicals could have humanhealth effects; there may be a reduction in present adverse off-site effects(as intended) but this will require careful design and management. Existingwater supplies are polluted and represent a health hazard.

OTHER ENVIRONMENTAL ISSUES:

Any additional settlement on the schemes could exacerbate off-siteimpacts; some of the hydraulic infrastructure development proposals couldadversely affect water transportation patterns; redevelopment of base camp inRiau could accelerate riverbank erosion and threaten historic site.

PROPOSED ACTIONS:

The scope of the project has been significantly reduced. Schemes withexcessive investments in hydraulic infrastructure have been deleted andproject investments have been focussed more on schemes which combine leastenvironmental impact potential with highest economic and social benefits.Clean water supplies will be provided to all inhabitants through roof-runoffsystems. An environmental management plan has been prepared and will beimplemented to help in optimizing detail designs and supervise construction.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Proposed project is given environmental "AA" rating as it could, withoutthe planned mitigation measures, have some adverse impacts on the environmentin view of the various planned activities including large-scale drainage andflood control, new land development and use of pesticides.

1-52

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

REPORTING SCHEDULE:

The EA process was started in June 1991. A draft Final EA Report,prepared on behalf of the Directorate of Swamps by the Asian Wetland Bureau,was reviewed by the Bank end-November 1992 and was finalized unchanged priorto Appraisal (January 1993). Simultanaeous EA processing has been undertakenby the Government of Indonesia and all approvals have been obtained.

REMARKS:

Consultations an the environmental/social impacts of proposed projectwere held in June 1992, with local NGOO/representatives of groups which wouldbe affected by the project and the EA Summary Report has been made publiclyavailable in the project areas. The Bank has obtained the government'spermission to release EA to the Board.

I-53

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDONESIA Project ID No: 4INSPA252Project : Kalimantan Urban DevelopmentAppraisal Date : January 08, 1994 IBRD Amount ($m): 100.00Board Date : May 24, 1994 IDA Amount ($m): 0.00Managing Division : EA3IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Nov. 13, 1993Date EA Category Assigned: Oct. 21, 1992

MAJOR PROJECT COMPONENTS:

Integrated urban infrastructure investment and support for local revenuegeneration and institutional development in five cities in Kalimantan.

MAJOR ENVIRONMENTAL ISSUES:

Possible consequences of urban infrastructure improvements are asfollows: (i) microdrainage problems due to better water supply; (ii) need forresettlement due to road and major drain construction; (iii) disposal ofpolluted drainage and waste water; (iv) proper operation of solid wastecollection and disposal; (v) acceptable sanitation solutions for RKampongimprovement (community upgrading) project; and (vi) disruptions duringimplementation and construction.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

(i) Carry out selective drainage improvements; (ii) prepare acceptableplans for any resettlement in consultation with local community and ensureadherence during implementation; (iii) provide suitable waste treatmentfacilities prior to final disposal; (iv) design appropriate system ofoperations and provide necessary equipment and training for environmentallyacceptable waste disposal; (v) provide TA ahd community facilities forimproved sanitation (human waste); (vi) plan and implement a well-designedconstruction program and stipulate appropriate pollution control measures;and (vii) provide TA and equipment to strengthen environmental analysis inthe preparation and appraisal of local government expenditure programs andsub-projects.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Project has been classified as "A" category due to the potential numberof people to be ressettled and the relatively large size of the program.Overall the project is aimed to have a positive impact on the urbanenvironment of the project cities.

REPORTING SCHEDULE:

IUIDP project preparation consultants have screened project componentsfor potential environmental impacts and EAs are under preparation where

I-54

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

warranted in accordance with Government of Indonesia regulations and IBRDOperational Directive. PILs were commented upon during the Oct./Nov. 1992preparation review mission. A Government of Indonesia in-house task forcesupported by some TA inputs is now finalizing the EA reports which will bereviewed in detail during preappraisal.

REMARKS:

Depending on the final scope of the project, significant involuntaryresettlement may be necessary in which case requisite resettlement plans willbe prepared for drainage and urban roads subprojects.

Te need for EA has been explained to and accepted by Government ofIndonesia. Ministry of Public Works EA procedures have been reviewed andfound acceptable and will guide the procedures to be followed by the localgovernments in designing and implementing this project. These procedures willbe agreed at negotiations.

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDONESIA Project ID No: 4INSPA281Project : Gas DevelopmentAppraisal Date : May 01, 1994 IBRD Amount (Sm): 200.00Board Date : January 31, 1995 IDA Amount ($m): 0.00Managing Division : EA3IE Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: N/ADate EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(i) Development of gas fields in Southern Sumatra and provision oftransmission and distribution infrastructure from South Sumatra to West Javafor supply of natural gas for power generation and industrial/commercialusage; and (ii) technical assistance and institution building to providelegal and regulatory framework to encourage significant private sector entryinto the gas sector.

MAJOR ENVIRONMENTAL ISSUES:

Potential risk to public safety as well as potential impact of pipelineconstruction on natural resources, tourism, and archaelogy.

OTHER ENVIRONMENTAL ISSUES:

At this stage, very few, if any, people are expected to have to beresettled since: (a) the pipeline wil run through a sparsely populatedportion of Southern Sumatra; and (b) routing of the pipeline would avoidsettlements.

PROPOSED ACTIONS:

PGN would: use strict internationally accepted standards forengineering and construction; incorporate results of the EA into the finalengineering design; and consult with affected groups and NGOs on thefindings of the EA and in preparing resettlement program.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Possible impact on safety, natural resources and resettlement.

REPORTING SCHEDULE:

TORs have been cleared by the Bank and financing for the EA has beenarranged. Consultants will do the EA which is to be conducted jointly withthe preliminary engineering design study, and will be recruited once a firmdecision is taken on selection of gas fields for development during theproposed project.

REMARKS:

Once the EA is done, special efforts would be made by PGN, theimplementing agency, to ensure that: (a) affected groups and all relevant

1-56

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

non-governmental organizations would be fully briefed on its findings; and

(b) their views are fully taken into account in project design and

implementation. During the next preparation mission agreement will be

reached with PGN on an appropriate strategy for carrying out these

consultations.

1-57

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDONESIA Project ID No: 4INSPA299Project : Surabaya Urban DevelopmentAppraisal Date : February 03, 1993 IBRD Amount -($m): 178.40Board Date : December 21, 1993 IDA Amount ($m): 0.00Managing Division : EA3IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: October 1992Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

Urban roads, water supply and distribution, drainage, solid wastedisposal, human waste disposal, KIP, and supporting TA services for city ofSurabaya.

MAJOR ENVIRONMENTAL ISSUES:

{i) Some resettlement/compensation due to road, major stormwaterdrainage and water distribution construction will be needed: (ii) human wastedisposal and sanitation in RIP areas (community upgrading); and (iii)landfill operations for solid waste disposal.

OTHER ENVIRONMENTAL ISSUES:

(i) Microdrainage problems due to disruption of water drainage system;(ii) disposal of polluted drainage silts and waste water; (iii) airpollution, noise and traffic due to solid waste collection and disposalactivities; and (iv) traffic disruption during construction.

PROPOSED ACTIONS:

(i) Carry out selective sanitation and stormwater drainage measures andimprovements in areas receiving increased water supply; (ii) implementresettlement/compensation plans; (iii) provide suitable treatment facilitiesfor disposal of stormwater and sewage flows; (iv) implement appropriatesystems for solid waste operations and provide necessary eguipment andtraining for environmentally acceptable disposal; (v) provide credit, TA andcommunity facilities for improved sanitation (human waste); and (vi) plan andimplement noise and pollution control measures in construction programs. Forthe actions which cannot be completed during project appraisal, the proceduresfor implementation would be set out and agreed during negotiations.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Based on the nature of the major environmental issues summarizedabove.

REPORTING SCHEDULE:

PIL (Information Reports) have been completed. ANDALs (ImpactAnalysis), RKLs (Management Plan) and RPLs (Monitoring Plan) for watersupply distribution, solid waste and human waste and other municipalservice sectors have been received by Bank and reviewed in June 1992. The

I-S8

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

ANDAL, RKL and RPL were satisfactory. A resettlement plan and proposals forfinal consultation with project-affected people were reviewed by appraisal

mission of 2/8/93; these are generally satisfactory, following theincorporation of revisions suggested by the mission. Government ofIndonesia officially submitted Environmental Assessment Summary prior toappraisal.

REMARKS:

Project-affected people/businesses have been surveyed to determinecompensation/resettlement needs and substantial consultations with them havebeen made. Borrower has agreed to release the EAS to the public following

appraisal by the Bank and will set up a Public Information Center todisseminate information about the project and measures to mitigate

adverse environmental effects, including resettlement of project-affectedpeople.

I-59

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDONESIA Project ID No: 4INSPA315Project : Biodiversity ConservationAppraisal Date : July 15, 1994 IBRD Amount ($m): 15.00Board Date : January 17, 1995 IDA Amount (Sm):Managing Division : EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned:

MAJOR PROJECT COMPONENTS:

The GEF project will support three initiatives of high priority, asidentified under the National Biodiversity Action Program; (a) an IntegratedConservation and Development Project (ICDP) focussing on Kerinci-SeblatNational Park; (b) restoration and development of the systematic collections;and (c) biodiversity conservation promotion. In view of the advanced stateof the preparation of the systematic collections subproject, this support islikely to be provided under a separate GEF project which would not requireBank loan funds.

MAJOR ENVIRONMENTAL ISSUES:

Impacts of the ICDP subproject are associated with possibleresettlement and development activities such as road construction in and nearthe park. The other subprojects would not have any adverse environmentalimpact.

OTHER ENVIRONMENTAL ISSUES:

This ICDP sub-project would address forest, land and soil degradationand loss of biodiversity in one of Indonesia's major protected areas (KerinciSeblat National Park) caused by agricultural encroachment, logging, mining,hunting and poor park management.

PROPOSED ACTIONS:

The development of an environmentally sound management plan for theproject area is inherent in the terms of reference of project preparationbecause the protection of environment and conservation of biodiversity arethe principal project objectives. ICDP subproject would be the firstfive-year time-slice of a 25-year process to establish a sustaninable park.During the implementation of the first five-year phase, environmentalassessments for certain specific future investments (e.g. resettlement andinfrastructure) may be necessary. Moreover, the ICDP would be analyzedduring these first five years, through a regional environmental assessment(REA), which would evaluate the potential impact of the ICDP on the largerregion (i.e. the four provinces), and if necessary recommend appropriatemitigating measures.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Since the project may include a small component of resettlement, theproject has been rated "A".

1-60

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

REPORTING SCHEDULE:

A preliminary management plan for Kerinci Seblat National Park hasbeen prepared, and boundary revisions and various inventories of communities,flora and fauna in and around the park, as well as spatial and land useplanning, are in progress. A series of technical background reportsincluding one on resettlement and a tentative proposal for the subprojectframework were completed in July 1993. The terms of reference for furthersubproject preparation are expected to be completed by September 1993. Thescheduling and type of EA to be prepared will depend on on-going dicussionon the subproject's scope in its initial phase. In the final preparationstages particular attention will be paid to, among others, resettlementissues and intrusions to the park such as gold mining and road-buildingactivities. Part of a recently approved Japanese grant fund of US5 1 millionwould be employed to conduct a regional environmental assessment to determinethe project's impact outside the park and buffer area. The initial 5-yearsub-project will aim at reducing futher biodiversity and environmentaldegradation in the park area and laying the foundation for long-termconservation of the park.

REMARKS:

The ICDP and the conservation promotion program would together addressthe fundamental issue of how to involve local people in planning andimplementing biodiversity conservation. The design of project preparationreflects the importance of this local involvement. In the ICDP, preparationactivities include participatory rural assessments, and formal and informalconsultation with local and national NGOs on preparation concepts anddocuments. The preparation of the conservation promotion program will alsoinvolve NGOs and make use of participatory assessments.

I-61

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :KOREA Project ID No: 4KORPA171Project :Ports Development and Environmental ImprovementAppraisal Date : February 15, 1994 IBRD Amount (Sm): 100.00Board Date : June 20, 1994 IDA Amount (Sm):Managing Division : EAlIN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: January 1994Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

Ship Waste Disposal Facilities: reception facilities and equipment for thedisposal of sewage, garbage, oily water, chemical/noxious and solid wastesfrom ships. Also the development of a software system to monitor andcontrol dumping of wastes at sea.Vessel Traffic Management System: system to reduce the number of shipaccidents and increase the safety of navigation in Korea waters.Construction of the Port of Dadaepo: construction of a new 8 berth portfacility to handle the shipment of timber and other general cargo. The portwill also contain an industrial area for the relocation of the timberprocessing plants currenlty located in the city of Pusan. The new port willreduce the need to transport timber through the center of the city in order toget the timber to the processing plants.Equipment for Container Terminal in Pusan: assist in the financing of thecontainer handling equipment needed for the new terminal.

MAJOR ENVIRONMENTAL ISSUES:

1. The construction of the new port at Dadaepo will require dredging andreclamation. After extensive review, the location of the port has beenagreed on by both the MOT and MOE. Detailed designs are under preparation toaddress the requirement that the dredging and reclamation activities arecarried out in an environmentally sound manner.2. The industrial facility at the port will generate some noise and airpollution, and facilities will be required to manage the timber processingwastes.3. The waste reception and treatment facilities will generate residuals whichmsut be appropriately disposed of.

OTHER ENVIRONMENTAL ISSUES:

1. The vessel traffic management system will reduce the likelihood ofenvironmental disasters caused by ship accidents.2. The effects of relocating the handling and processing of imported timberwill have a positive effect on the traffic congestion and air pollution inthe City of Pusan.3. Through technical assistance the proposed project will asesist theGovernment to assess the impact of future projects on the pollution in theYellow Sea large marine eco-system by developing baseline data against whichto measure the level of future pollutants. The project will also support theGovernment's training program on the preparation of EAIs in Korea.4. The ship waste disposal facilities will provide ships with an alternativeto dumping their wastes at sea.. The facilities will serve as prototypes for

I-62

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

similar investments in Korea and other Asian ports.5. The new container terminal and the inland container depot will enable theCity to close the various off dock container yards located throughout thecity which will significantly reduce the truck traffic moving containers inthe City.6. The construction of the new port of Dadaepo will result in theresettlement of about 50 people currently living in the area. A resettlementplan will be prepared by KMPA as part of the detailed designs for thefacility.

PROPOSED ACTIONS:

1. Environmental assessment study for the proposed site for the new portfacility has been prepared and submitted to MOE for review. The Englishversion of the Executive Summary of the EA for Dadaepo is being prepared andwill be submitted to the Bank in late December or early January after thecomments from MOE have been received and incorporated into the document.2. Smaller focused environmental studies will be prepared to address thedesign and location of the waste disposal facilities, and the noise and airpollution and the solid wastes generated by the industrial area at the port.3. Government must develop a management and monitoring plan to control theabove identified environmental issues.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The proposed project is currently rated as an A because of the need forland reclamation, and the industrial emissions.

REPORTING SCHEDULE:

Contracts have been signed for: (a) design of required ship waste disposalfacilities - preliminary plan was submitted in 6/92, completion of thedetailed plan has been postponed now until 5/94; (b) feasibility study,preliminary design and an environmental impact assessment (EIA) for the newport facility. The EIA will address all of the potential impacts associatedwith the project to include alternative sites, physical environment of thesites, the marine environment and eco-system, the impact of dredging, and theproposed industrial area. The draft EIA was submitted to MOE in 10/93. Itwill be submitted to the public for comment in 11/93. These comments will beincorporated into the final report produced in 1/94; and (c) the detailedengineering for the VTMS was completed in late 1993. The EIA for theconstruction of the new container terminal being financed by the Governmenthas been prepared and is being translated and will be sent to the Bank.

REMARKS:

- The decision has been made to locate the port away from the Naktong Riverand the bird sanctuary. This decision has been endorsed by the MOE.

- The current port/industrial site will require a minor amount ofresettlement, but a plan is being prepared to adequately address this issue.

- Extensive discussions were held with the Ministry of Environment concerningtheir procedures for the prepartion of the environmental impact assessment.It was determined that the EIA requires that the mayor open the draft EIA to

1-63

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

public participation for 20 days. The mayor delivers the comments receivedfrom agencies and the public to the project agency and may hold a conferenceto discuss the project with the public.

I-64

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : PAPUA NEW G. Project ID No: 4PAPPA045

Project : Forest Management and ConservationAppraisal Date : May 30, 1994 IBRD Amount ($m): 10.00

Board Date : March 14, 1995 IDA Amount (Sm):Managing Division : EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: To be determinedDate EA Category Assigned: October 7, 1993

MAJOR PROJECT COMPONENTS:National Forest Service support and implementaion assistance for the

National Forest Development Guidelines: training, infrastructure, forest

inventory, logging permit reviews.

MAJOR ENVIRONMENTAL ISSUES:

1. Forest zoning for potential production, protection and reserve

areas.

2. Environmental field procedures to be developed with forestservices.

3. Role of indigenous and local people in decision making processes of

forest management.

OTHER ENVIRONMENTAL ISSUES:

Review of environmental plans and impacts of existing operations.

PROPOSED ACTIONS:It is proposed that an environmental specialist (ES) and a social

science specialist (SSP) accompany the FY 94 project preparation mission.

The task of the ES and the SSP would be to assist in assessing the potential

environmental and social impacts of the project components. Based on thepotential impacts of project on the indigenous and local people they should

also start consultations to assess their perception and views about the

project. On return from the mission, the ES and the SSP in consultation withthe task manager would make out a detailed terms of reference for further

study/analysis and preparation of a draft EA report. This report will thenbe subjected to the steps indicated in OD 4.01.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

It is likely that the project, by supporting improved forest management

and conservation planning, will have a beneficial impact on the environment.However, the project may assist the Government with macro planning and a

forest inventory, together with forest zoning into production, protection, andreserve areas. Production forests would be eligible for logging. This would

impact on the environment and also on the local people. Further, allocation

of roles to the local and indigenous people and the new Forest Service in

forest management would have social impacts that need to be analyzed indetail.

I-65

ENVIRONMENTAL DATA SHEET FOR CATEGORY "At PROJECTS

REPORTING SCHEDULE:

To be determined.

REMARKS:

None.

I-66

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :PHILIPPINES Project ID No: 4PHLPAl75Project :Casecnan TransbasinAppraisal Date : July 15, 1994 IBERD Amount (Sm): 450.00Board Date :September 12, 1995 IDA Amount ($m): 0.00Managing Division :EAlIE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: 3rd Quarter, 93Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

(Subject to confirmation by consultants currently working on the projectl:-(a) A 197m high rockfill dam and a storage reservoir in the Casecnan

basin; (b) a 25.7 km long transbasin tunnel; (c) a 156 MW hydro power stationat the end of the tunnel and adjacent to the Pantabangan reservoir; (d) anincrease of the maximum level and storage of the Pantabangan reservoir and ofthe capacity of existing Pantabangan and Masiway hydro power stations withadditional 100 MW and 12 MW respectively; (e) improvements in the irrigationof an ongoing 102,300 hectares and the development in additional year roundirrigation of some 92,300 hectares of agriculture lands in three independentservices areas; (f) watershed management for the Conwap and Pantabanganreservoirs; and (g) resettlement of the population displaced by thereservoir(s) and any people involuntarily displaced by the constructionsite and downstream irrigation works.

MAJOR ENVIRONMENTAL ISSUES:

(a) environment considerations during construction includingpollution from construction operations, housing and otherfacilities for workers, and induced development;

(b) maintenance of adequate downstream flows and control offlooding of the Cagayan River;

(c) watershed management, including reforestation;(d) control of soil salinization, water-logging and excessive use

of pesticides and fertilizers in the service areas;(e) resettlement and relocation of affected populations including

tribal people;(f) loss of-biological resources by inundation; and(g) possible increased incidence of malaria and waterborne diseases

associated with project development.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Further processing of the project has been delayed until March 1994pending completion of a consultant's sutdy of a third alternative scheme.

The proponents (the National Irrigation Administration and the NationalPower Corporation), as part of the feasibility studies, are to develop anenvironmental mamagement plan in consultation with the affected groups. Thiswould demonstrate how environmental measures will be effectively integrated

I-67

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

with project design and implementation and provide details on budgetaryscheduling and manpower requirements for implementing the necessary measures.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

An Environmental Impact Assessment (EIA) and an EnvironmentalPerception Study (EPS) have already been prepared for the project. Thedocuments identify and assess the major environmental impacts likely to begenerated by a project of this nature and extent. During the preparationmission the environmental issues will be re-examined and procedures,including terms of reference for further studies if need be, will be agreedto develop both a relocation resettlement plan and a comprehensiveenvironmental management plan which will be monitored during projectsupervision.

REMARKS:

None.

I-68

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : PHILIPPINES Project ID No: 4PHLPA202Project : Leyte Luzon GeothermalAppraisal Date : June 23, 1993 IBRD Amount ($m): 213.00Board Date : May 17, 1994 IDA Amount ($m):Managing Division : EA1IE Sector: PowerLending Instrument: Specific Investment Loan status: LendingDate for receipt of EA by Bank: May 1993 (revised)Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:The project includes three major components: (a) the exploration and

development of the geothermal field by PNOC; (b) the generation by a BOT fromprivate contractors; and (c) the transmission system to Luzon including: (i)8 modular geothermal plants (55 MW); (ii) substantion and transmission line;(iii) AC/DC converter stations; (iv) submarine cable (about 23 km); (v) highvoltage DC transmission line from Leyte to Naga and strengthening of HVACline.

MAJOR ENVIRONMENTAL ISSUES:

The main issues which need to be addressed include; (a) safe disposalof the geothermal liquid or brine; (b) control of air pollution from thedischarge of non-condensible gases; (c) some flora removal for theconstruction of wells; (d) subsequent watershed protection to preventimmigration of people into sensitive forested areas; (e) safe environmentalconstruction (erosion protection); (f) local population acceptance of theproject; and (g) adequate resettlement and compensation for some 127 families.

OTHER ENVIRONMENTAL ISSUES:

Minor impact of the transmission line right-of-way requiringcompensation for impact on crops, trees and relocation of rural houses withinsame location.

PROPOSED ACTIONS:

The following actions have been taken:

(a) provision for proper disposal of wastewater. The project design mandatesthat all extracted liquids be reinjected into the same geothermal reservoirs,using deep wells especially drilled for this purpose;

(b) small amounts of H2S gas may be discharged primarily from the powerstations, but ground-level concentrations will be below health standardslimits. The feasibility of installing an H2S absorption unit will beinvestigated; if not, to increase diffusion of such gas it would beexhausted at high elevation. To avoid any smell nuisance, 127 families inthis scarcely populated area (for both Leyte-Cebu and Leyte-Luzon geothermalprojects) will be relocated with adequate compensation, to outside aone-kilometer radius from the wells area that may be so affected. A detailedresettlement plan has been prepared which is satisfactory;

(c) the area to be used has been minimized by optimizing the use of the

I-69

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

wells. The wells are cased in thick steel to a depth of about 1,000 meters,to avoid any contact with aquifers or superficial waters. PNOC have alreadyestablished a watershed protection program in Leyte including about 60 staff.This program will be maintained to avoid migration to forest areas;

(d) proper construction techniques and environmental protection duringconstruction are included in the EIA and would be included in the tenderdocuments. Its implementation would be supervised by the Department ofEnvironment and Natural Resources (DENR) and local NGOs; and

(e) the local people have been consulted and the local governments in thearea have endorsed the project.

NPC and PNOC have completed the EAs for the generation of 640 MW andthe transmission line and the Environmental Summary was distributed tothe Board on June 22, 1993, expanding the capacity from the 440 MW includedin the EA distributed on June 30, 1992.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Although the environmental impact is minor, and the project bringsenvironment benefits, it was classified as category "A" to bring fullenvironmental review to it given its expected GEF funding.

REPORTING SCHEDULE:

EA for construction and operation of Leyte A steamfield andpower station and transmission lines was submitted to the Board on June 22,1993 and is available for consultation.

A resettlement action plan has been submitted to the Bank and approved.

REMARKS:

The consultation process with local people and NGOs has been completed.The last public hearing took place in Osmoc in March 1993. Based on theseconsultations DENR approved the Enrivonmental Clearance Certificate for theproject construction, including adequate mitigation abnd monitoring measures.These measures will be supervised through involvement of DENR, NGos and thelocal government in the process.

I-70

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :THAILAND Project ID No: 4THLPA132Project : Land Reform and Forest ProtectionAppraisal Date : May 01, 1994 IBRD Amount ($m): 30.00Board Date : November 15, 1994 IDA Amount (Sm): 0.00Managing Division : EAIAN Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: N/ADate EA Category Assigned: Mar. 4, 1993

MAJOR PROJECT COMPONENTS:

Conservation forest protection, ecosystem management and development ofvillages in buffer zone to reduce forest incursions or destruction ofbiodiversity.

MAJOR ENVIRONMENTAL ISSUES:

Protection measures to be used involving villagers; framework to handleinhabitants in conservation forests; land tenure in buffer zones.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Improved protection by authorities and joint involvement of affectedvillages. Prior consultation with NGOs has started with a seminar in August,1992 to obtain their views on the issues described. Project preparation team(in progress) has a sociologist which will interact with NGOs and affectedvillages to solicit their views.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Since the project is designed to ameliorate environmental problems(espcially in the preservation of valuable ecosystems and biodiversity andprotection of key head watersheds) rather than to create them, positiveenvironmental impacts are expected. Given the high profile and wideenvironmental effects of forest projects, however, we propose changing theenvironmental assessment category to "A" unless the preappraisal missionscheduled for November recommends otherwise.

REPORTING SCHEDULE:EA, if needed, could be started in December 1993. First draft expected

in March 1994.

REMARKS:

Local NGO units contacted are as follows: (a) CARE International inThailand; (b) Foundation for Agricultural and Rural Development; (c) HillArea Development Foundation; (d) Huai Kha Khaeng Buffer Zone Project; (e)Local Development Foundation; (f) NGO Coordinating Committee on RuralDevelopment; (g) Northern Development Workers Association; (h) Population and

I-71

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Community Development Association; (i) Save the Children; (j) SeubNakhasanthien Foundation; (k) Technology for Rural and Economical Enrichment;(1) Thailand Rural Construction Movement; (m) United Nations Drug ControlProgram; and (n) Wildlife Fund Thailand Under Royal Patronage.

I-72

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : THAILAND Project ID No: 4THLPA148Project : Second Gas TransmissionAppraisal Date :September 11, 1993 IBRD Amount ($m): 180.00Board Date :March 29, 1994 IDA Amount ($m):Managing Division :EAlIE Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: September 1993Date EA Category Assigned: May 1993

MAJOR PROJECT COMPONENTS:

The project consists of: (a) 36", 425 km submarine (offshore) gastransmission pipeline; (b) 28", 110 km onshore gas transmission pipeline; and(c) other associated facilities including compressor station, meteringstation, gas processing facilities and telecommunication system; and (d)engineering management consultancy and technical assistant components forinstitutional building.

MAJOR ENVIRONMENTAL ISSUES:

Potential impacts include:(i) disruption of marine life and changes in seabed conditionsduring construction, possible effect on fishing yields; (ii) dischargeof effluents (associated water, sewage) and solid wastes from productionplatforms during drilling, construction and production; (iii) noise andvibration during construction; (iv) disposal of elemental mercury that may bepresent in the gas based on similar experience in other gas wells in the Gulfof Thailand; (v) lack of safety engineering and environmental standards in PTT(this issue was addressed in previous loan and a US$200,00 study is beingcarried out to prepare such standards; (vi) lack of environmental and safetyregulations. for offshore operation (this issue was also addressed during thelast loan and ADB has provided a US$300,000 grant for carrying out this study,the interim report of which is now available to the Bank); (vii) lack of baseline environmental data on marine flora and fauna in the Gulf of Thailand;and (viii) accidents and major hazards caused by possible collision of shipswith construction equipment or platforms and gas leaks due to pipe ruptures.(Please refer to remarks below).

OTHER ENVIRONMENTAL ISSUES:

To be determined.

PROPOSED ACTIONS:

Follow up on the progress status of preparation of the safetyengineering and environmental standard study, and on ADB's environmental andsafety regulation study.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

1-73

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Draft EA was reviewed in September 1993. Revised as per Bank comments.Revised draft has been received and is now under review.

REMARKS:

Similar issues have been experienced in the Bongkot Gas pipelines whichis in the vicinity of the suggested project.

I-74

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : THAILAND Project ID No: 4THLPA151Project : Highway Sector VAppraisal Date : January 05, 1994 IERD Amount ($m): 200.00Board Date : July 05, 1994 IDA Amount ($m):Managing Division : EAlIN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: January 1994Date EA Category Assigned: September 27, 1993

MAJOR PROJECT COMPONENTS:

The project would provide financing for the initiation of the SeventhDevelopment Plan as it relates to the national and provincial road network,as well as nome carry-over works from the Sixth Plan periods. This willinclude the widening and improvement of roads to enhance network capacity andthe rehabilitation of existing roads to restore their surface condition andtheir ability to service increasing traffic and vehicle weights. A keyfeature of the project will be continuation of Bank financial support for theImplementation of RTG Action Plans related to Vehicle Emissions and TrafficSafety (begun under the Fourth Highway sector loan). DoH will also beassisted in strengthening their EA capacities.

MAJOR ENVIRONMENTAL ISSUES:

The road capacity expansion and rehabilitation activities focus onworks to be carried out on existing alignments and typically within theexisting right-of-way which are unlikely to cause significant impacts. Allsubprojects will be screened and appropriate EA documentation prepared by DoHtaking into consideration potential environmental impacts in compliance withRTG and Bank EA guidelines. Minor and short term impacts which may ariseduring the construction phase will be mitigated through the use ofappropriate guidelines for design and construction. In cases where propertyacquisition will be required, this will generally concern minor widening ofright-of-way. Any resettlement will be handled according to Bank guidelines.

OTHER ENVIRONMENTAL ISSUES:

Procedural and definitional issues continue to arise between DoH andthe National Environment Board, responsible for supervising the Thai EAprocess. Further refinements to regulations and guidelines are needed.

PROPOSED ACTIONS:

A sectoral EA will be prepared both to confirm the adequacy of currentpractices and to suggest improvements/strengthening needed. However, it isalready agreed with DcH, that, based on subproject EA results, DoH willinstitute appropriate (typically minor) mitigation measures for each roadsegment to be improved. Continuing implementation of the vehicle emissionsreduction and traffic safety action plans should provide a national networkof vehicle inspection centers during the project period. Institutionalstrengthening of key sector agencies to improve environmental managementcapacities based on the results of the sectoral EA will also be supported bythe project. Bank operational planning included close supervision of the EA

I-75

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

process and actions plans implementation.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Sectoral EA will provide the basis for design of a project componentexplicitly focused on strengthening DoH EA process and linking EA results tothe implementation of road projects. While there is minimal risk of seriousnegative impacts from this project, the focus on improved EA procedures andimplementation of the Action Plan for Vehicle Emissions Reduction makeenvironmental issues central to the project and warrants the 'A"classification.

REPORTING SCHEDULE:

The sectoral EA for Thailand Highways will be prepared by January 1994.

REMARKS:

None.

I-76

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :VIET NAM Project ID No: 4VNMPA010Project :Irrigation SubsectorAppraisal Date : May 31, 1994 IBRD Amount ($m): 0.00Board Date :November 01, 1994 IDA Amount (Sm): 65.00

Managing Division : EAlAN Sector: AgricultureLending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: March 1994Date EA Category Assigned: June 29, 1993

MAJOR PROJECT COMPONENTS:

The project would support: (a) rehabilitation and completion of five to

seven irrigation schemes in the central part of Vietnam outside the Red andMekong River deltas; (b) technical assistance and training to improveirrigation systems design, construction and operation, and strengthening ofirrigation management companies and farmer organizations and water usersassociations.

MAJOR ENVIRONMENTAL ISSUES:

Rehabilitation of existing schemes does not pose major environmentalrisks. The project is expected to have a positive environmental impact byimproving distribution and efficiency of water use. One of the proposedsubprojects (Hoc Mon/North Binh Chanh), however, is affected by outsidesources of industrial pollution and would involve reclamation of acidsulphate and saline soils.

OTHER ENVIRONMENTAL ISSUES:

Construction of new irrigation canals in two of the proposedsubprojects (Thach Nam and Hoc Mon/North Binh Chanh) would entail realignmentof farm boundaries and relocation of some 2,100 farm plots (and a limitednumber of homes) to reserve areas within the same irrigation scheme. Inaddition, about 5,600 families would be settled in semi-urban settlements in

Hoc Mon Binh/North Chanh, and a not yet determined number of families inagricultural areas in two subprojects (Tach Nham and Dong Cam). There arewell established mechanisms for relocation of the affected farm plots andthis should, therefore, not pose major problems.

PROPOSED ACTIONS:

(a) A detailed environmental impact assessment and urban resettlementplan would be prepared as part of an overall development plan for the HocMon/North Binh Chanh subprojects; (b) the FAO/CP has issued an environmentalanalysis for other subprojects, which would be followed by additional work asnecessary (no detailed EIA for these projects is required); (c) detailed

resettlement plans would be prepared for subprojects involving involuntaryrelocation of farm plots; and (d) a monitoring system on the impact offertilizers and chemicals would be established for the project, and effortswould be made to strengthen environmental management capacity in the

irrigation subsector.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

1-77

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

The project has been made an "A" in view of the environmetal andresettlement problems for the Hoc Mon/North Binh Chanh subproject mentionedabove.

REPORTING SCHEDULE:

Terms of reference have been prepared and consultants, financed underan Italian TA grant for project preparation, will carry out an EIA for theHoc Mon/North/Binh Chanh subproject. Government of Vietnam, assisted byconsultants, will prepare resettlement plans for affected subprojects.

REMARKS:

Consultation with project affected people and NGOs would be done inaccordance with ODs 4.01, 4.20 and 4.30.

I-78

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : VIET NAM Project ID No: 4VNMPA012Project : Power Sector Rehabilitation and ExpansionAppraisal Date : May 02, 1994 IBRD Amount ($m): 0.00Board Date : October 30, 1994 IDA Amount ($m): 106.00Managing Division : EAlIE Sector: EnergyLending Instrument: Sector Investment and Maintenance Status: LendingDate for receipt of EA by Bank: Feb. 1994Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

The project has the following components: (a)rehabilitation/reinforcement of the distribution systems in Ho Chi Minh, Hueand Nahtrang; (b) rehabilitation/expansion of the 100 kV and 66 kVtransmission systems around Ho Chi Minh; (c) a new 110 kV transmission lineand substation for Kon Tom; (d) south and center load dispatch centers; and(e) conversion of 2, Ba Ria open cycle turbines to a 100 MW combined cycle

unit.

MAJOR ENVIRONMENTAL ISSUES.

1. The transmission, distribution and load dispatch center components of

the project (Environmental Category B) are not expected to pose anysiginificant environmental issues. Rehabilitation of old, cluttereddistribution networks in major cities would contribute to greater safety in

operation. Most of the transmission line work would be along existing routesand hence displacement of persons, traverse over agricultural land, orencroachment on ecologically sensitive areas such as forests or nationalparks, if at all, would be minimal. The siting of substations and loaddispatch centers will be planned to avoid displacement of people.

2. The conversion of existing open cycle combustion turbines at Ba Ria(Environmental Category A) to combined-cycle operation would not posesignificant environmental problems. The quantity of fuel used would be thesame; hence atmospheric pollution would not be different from what it is

today. Currently the fuel used is light distillate, the plants are locatedon remote flat terrain, power concentration is low and existing ambient

atmospheric conditions are well within norms. Later, the plants would beconverted to an even more benign natural gas fuel. There would be an impact

on aquatic systems due to cooling water requirements for the steam cycle, butthis is not expected to be serious as adequate cooling water mass isavailable nearby. No resettlement is expected, as all installation would be

within already acquired and developed plots.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Transmission and distribution line routings and substation and loaddispatch center locations would be subject to review by the Bank. The power

companies would be required to carry out Initial Environmental Inspection

I-79

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

(IEE) for major components to ascertain need for more detailed EAs. Iftransmission lines are found to cross environmentally sensitive areas, theywould be rerouted. Likewise, substation locations would be changed, asnecessary, to suit environmental requirements. In the unlikely event ofresettlement of persons, adequate compensation/resettlement arrangments wouldbe provided.

An EIA would be performed for the Ba Ria power station site taking intoaccount current and future expansion plans. The ambient NOx and noise levelswould be estimated and suitable measures provided in the unlikely event thatthese exceed guidelines. Thermal pollution effects would be controlled bylimiting temperature rise of colling water discharge to permissible levelsand ensuring proper dispersion. Levels of chemical pollutants in theeffluents would be controlled by appropriate means.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

The IEE for the transmission line, substation and load dispatch centercomponents and the EIA for the Ba Ria thermal power station are expected tobe available prior to appraisal in February 1994. The EIA will-be subject toreview and clearance by the Ministry of Science, Technology and Environment.

REMARKS:

This project is not expected to have direct impact on persons, andhence the need for consultation is not foreseen.

I-80

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : ALGERIA Project ID No: 5ALGPA036Project : Highways VIAppraisal Date : April 28, 1994 IBRD Amount ($m): 125.00Board Date : December 06, 1994 IDA Amount ($m): 0.00Managing Division : MNlIN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: February 1994Date EA Category Assigned: March 4, 1993

MAJOR PROJECT COMPONENTS:

There are six components: (i) construction of a 23 km section ofmotorway; (ii) rehabilitation/strengthening of 700 km of priority roads;(iii) purchase of equipment for maintenance of Saharan roads; (iv) executionof a bridge rehabilitation program; (v) technical assistance for design andsupervision of works; and (vi) capacity building in the area of road andmotorway management and road safety.

MAJOR ENVIRONMENTAL ISSUES:

The motorway construction may have impacts at three levels: (i) builtin a hilly terrain and comprising a 3-km long tunnel, the construction impliessignificant earth moving, which needs appropriate material disposals, drainageand erosion control; (ii) some of the needed land will be withdrawn fromcurrent low-yield agriculture uses, and the section under study may havedeferred impact since the follow-up westward section will cross the richirrigated agriculture area around Khmis Miliana; and (iii) small scaleresettlement is involved.

OTHER ENVIRONMENTAL ISSUES:

Rehabilitation and maintenance works are unlikely to generatesignificant environmental impacts; good engineering practices combined withincreased awareness of potentially adverse impacts in the treatment ofborrowing pits and waste and materials disposals should leave the environmentunaffected.

PROPOSED ACTIONS:

Studies have already have been done covering the land expropriationissues associated with the motorway. A standard environmental assessment(EA) is launched under TOR agreed by the Bank. The EA will build on theirfindings and expand their scope for full coverage of above described issuesand definition of corresponding mitigating actions. A more limited assessmentwill be carried out for the rehabilitation/strengthening component and itsrecommendations will be integrated in the bidding documents for civil worksand their supervision. The motorway section is designed to have a possibleimpact on road safety and a safety audit is being organized for nationalroads. Institutional strengthening of the Ministry of Equipment is envisagedin the proposed project to enhance its capacity for follow-up environmentalmitigation plan.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Category "A" has been chosen because of the new motorway construction;recent addition of the motorway component to the project explains the shiftfrom "B" to "A" category project.

REPORTING SCHEDULE:

The EA for the motorway construction is in progress by localconsultants with the help of foreign TA. A draft is planned to be sent tothe Bank in February 1993, and the final EA in February 1994.

REMARKS:

None.

I-82

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : EGYPT Project ID No: SEGTPA184Project : Power Sector InvestmentAppraisal Date :August 02, 1994 IBRD Amount ($m): 200.00Board Date : March 13, 1995 IDA Amount (Sm): 0.00

Managing Division : MN2IE Sector: PowerLending Instrument: Specific Investment Loan Status: Standby

Date for receipt of EA by Bank: Oct. 1993 (tentative)Date EA Category Assigned: May 12, 1992

MAJOR PROJECT COMPONENTS:

I - Supply and Installation of the second 600 MW phase of a 1200 MWthermal power station.

II - Installation of transmission lines and substations (including lineloss reducing equipment).

III- Technical Assistance.

MAJOR ENVIRONMENTAL ISSUES:

Availability of natural gas, proximity to Mediterranean coast and urbanareas; SOx, NOx and particulate emissions, ambient air and water quality.

OTHER ENVIRONMENTAL ISSUES:

Screening of gas pipeline and transmission line corridors.

PROPOSED ACTIONS:

To be developed during preparation of Environmental Impact AssessmentReport.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Installation of a major thermal power station with the associatedtransmission lines, substations and natural gas pipeline.

REPORTING SCHEDULE:

To be developed in June 1993.

REMARKS:

To be developed.

I-83

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : EGYPT Project ID No: 5EGTPA194Project : Damietta-Cairo Inland WaterwaysAppraisal Date :June 23, 1994 IBRD Amount ($m): 70.00Board Date : February 10, 1995 IDA Amount (Sm):Managing Division :MN2IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank:Date EA Category Assigned: 12/20/93

MAJOR PROJECT COMPONENTS:

Navigation locks, navigation aids, adjustable weir.

MAJOR ENVIRONMENTAL ISSUES:

Changes in hydrology along Damietta branch of the Nile.

OTHER ENVIRONMENTAL ISSUES:

Impact on fisheries, increased flooding.

PROPOSED ACTIONS:

To be developed.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

Environmental assessment has been completed.

REMARKS:

None.

1-84

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : IRAN Project ID No: 5IRNPA050Project : Tehran SewerageAppraisal Date : February 15, 1994 IBRD Amount (Sm): 100.00Board Date : June 14, 1994 IDA Amount ($m):Managing Division : MNlIN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: September 1993Date EA Category Assigned: November 18, 1991

MAJOR PROJECT COMPONENTS:

Provision of sewerage system for Tehran including collection, treatment,and effluent reuse systems.

MAJOR ENVIRONMENTAL ISSUES:

Major environmental issues include: improvement of collection,treatment, and disposal of sewage treatment. The development of standardsand guidelines for the safe operation of the plant.

No major environmental issues are foreseen. Those normally associatedwith sewerage and effluent reuse are being addressed through appropriatedesign.

OTHER ENVIRONMENTAL ISSUES:

(i) Odor from assocated treatment plant; (ii) quality of the effluent;and (iii) those normally associated with construction.

PROPOSED ACTIONS:

Treatment process would minimize odors. Treated effluent will bemixed with other irrigation water prior to use.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The large size of treatment plant and effluents are the main reasonsfor the EA category "A".

REPORTING SCHEDULE:

REMARKS:

Draft EA Reports for sewerage project and assciated pipe factories havebeen review (8/92 and 10/92) and comments provided to the implemting agency.Revised final draft was review by the Bank in September 1993 and foundacceptable.

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :YEMEN Project ID No: 5YEMPA215Project ; Safir-Hadramout RoadAppraisal Date : January 10, 1994 IBRD Amount (Sm):Board Date : May 31, 1994 IDA Amount ($m): 20.30Managing Division : MN2IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: January 20, 1994Date EA Category Assigned: September 1, 1993

MAJOR PROJECT COMPONENTS:

Construction of a new road; and technical assistance.

MAJOR ENVIRONMENTAL ISSUES:

To be developed.

OTHER ENVIRONMENTAL ISSUES:

To be developed.

PROPOSED ACTIONS:

To be developed.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

REPORTING SCHEDULE:

EA study ongoing.

REMARKS:

None.

I-86

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : BOLIVIA Project ID No: 6BOLPA080Project : Environment, Industry and MiningAppraisal Date : November 15, 1994 IBRD Amount ($m): 0.00Board Date : September 15, 1995 IDA Amount ($m): 19.50Managing Division : LA3TF Sector: Mining & other ExtractiveLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: April 6, 1993Date EA Category Assigned: Jan. 14, 1993

MAJOR PROJECT COMPONENTS:The project would include nine components to: (i) build the capacity of

MMM and MECE to develop and apply adequate environmental and worker healthand safety criteria to screen investment proposals in their respectivesectors; (ii) finance the Government's share of remediation of investmentsarising from COMIBOL or industrial privatizations; (iii) establish a facilitywith adequate technical and financial resources to encourage development offirm level feasibility studies and engineering designs for dischargemitigation and their implementation by M&I firms; (iv) carry out studies onmatters related to the environmental impact and the health and safety ofmining and industrial workers; (v) implement the recommendations of the studyto identify impediments to financing in mining sector, which is to becarried out under the MSRP; (vi) conduct environmental education anddisseminate technical information germane to M&I pollution mitigation; (vii)institution-building as necessary in MMM to facilitate mining development ofcontinuing support for the modernization of sector administration and thedevelopment of a modern and reliable technical base; (viii) (possibly) carryout a feasibility study for the rational development of an industrial parkand associated infrastructure in El Alto; and (ix) (if warranted) a creditline to provide terms finance for investments in private-sector M&Imitigation.

MAJOR ENVIRONMENTAL ISSUES:

Mining and industrial enterprises are polluting national waters throughtheir discharges to surface and ground waters.

OTHER ENVIRONMENTAL ISSUES:N/A

PROPOSED ACTIONS:1. Addressing broad policy, legal and institutional issues, including:

* Strengthening of institutions;* Planning for sound use of land and national resources;* Setting goals for ambient environmental quality;* Planning for new investments;* Address regulatory and implementation issues (e.g., promotion of sound

technologies, increasing laboratory and monitoring capacities, establishguidelines for waste management);

* Prioritizing occupational health and safety.2. Addressing selected major targets for mitigation, including:

* Improving environmental management in Oruro;* Potosi and the recession of the sector;* Small-scale and informal mining;

I-87

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

* Improve urban and industrial planning in El Alto;* Upgrading watershed management in Santa Cruz.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Project is considered an environmental project. Thus Category A applies.

REPORTING SCHEDULE:

Draft sectoral EA submitted to LATEN on April 6, 1993.

REMARKS:

I-88

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :BRAZIL Project ID No: 6BRAPA223Project : CEARA: Urban Development & Water Resources ManagementAppraisal Date : November 30, 1993 IBRD Amount J$m): 120.00Board Date :July 15, 1994 IDA Amount ($m): 0.00Managing Division :LAIIN Sector; UrbanLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Nov. 1993Date EA Category Assigned: May 1993

MAJOR PROJECT COMPONENTS:

(a) Institutional development: This would include consulting servicesfor technical assistance, training, studies and information technologyequipment to provide a broad range of targeted support (still to be finalized)to: (i) SDU and dependencies [including to the State Environmental agency-SEMACE]; (ii) SRH and dependencies [including IWRM Entity]; (iii)municipalities; and (iv) to the project coordination Unit [GGP]; (b) poverty-targeted (family income less than 2MW) basic municipal infrastructure (watersupply and metering, sewerage, drainage, solid waste, paving, etc.); and (c)IWRM-infrastructure component: (installation of about 350 km of raw waterdistribution pipes (donated by USA following dismantling of army basesoverseas], construction of about 40 medium-sized reservoirs for targetedurban areas in the "vazios hidricos", rehabilitation and improved operation ofexisting reservoirs, hydrometric stations and monitoring equipment, etc.).

MAJOR ENVIRONMENTAL ISSUES:

Almost all of the environmental impacts under the project are positive.Investments under (b) are focused on primarily reducing the problems ofinadequate basic sanitation, and implementing preventive actions to controlirregular settlement in areas of risk (such as flood plains). Investmentsunder (c) will be positive, particularly mitigation of consequences ofprolonged periods of drought, and risks of flash floods. New reservoirs willregulate river flows which will result in increased firm and predictableyields of water, provided the reservoirs have multi-year storage capacity.

OTHER ENVIRONMENTAL ISSUES:

During construction, there may be a need to destroy natural vegetation(dry scrub species); also, minor environmental impacts may occur from borrowpits or other construction-related earth movements, as well as the disposalof construction debris.

PROPOSED ACTIONS:

The Borrower will implement the project as designed (i) SEMACE wouldensure that RIMAs are carried out in accordance with Bank's OD 4.01; (ii) noindividual subproject is expected to require resettlement of more than 30-50families -- most are likely to be voluntary -- because access to water isnumber one goal. The state has agreed to prepare an overall StateResettlement Policy for use in all situations (even beyond the text project)in accordance with Bank's OD 4.30; (iii) it is proposed that in a "SideLetter to the Loan Agreement" the Borrower would agree to follow "good

I-89

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

environmental practices" related to reservoir construction, rehabilitation,and maintenance. The Bank will appraise the RIMA and Resettlement Plan forthe first dam of five to be financed under the project and demonstratecapacity of borrower.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

(i) Part (a) (ID component) will reinforce and strengthen SEMACE'scapacity to regulate and enforce envlronmental policies, ensuring greatersustainability; (ii) part (b) will benefit thousands of poor families,through access to basic services, sanitation, and in some cases, security oftenure away from areas of risk; and (iii) implementation of part (c) willbring immediate benefits to Ceara's urban and rural communities living in thedrought risk "pockets", through maximizing utilization of existing resources,and mitigate the effects of prolonged droughts or flash floods. Other N.E.States in particular, may benefit from Ceara's experience in institutionalbuilding, and with implementing IWRM, which may also facilitate the task ofthe Federal Government in implementing the National IWRM System.

REPORTING SCHEDULE:

Start-up: April 1993First draft: July 1993Status: Under preparation

REMARKS:

None.

1-90

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : COLOMBIA Project ID No: 6CLMPA215

Project : Santafe I

Appraisal Date : November 29, 1993 IBRD Amount ($m): 250.00Board Date : June 14, 1995 IDA Amount ($m):

Managing Division : LA3IN Sector: Water Supply & Sanitation

Lending Instrument: Sector Investment and Maintenance Status: Standby

Date for receipt of EA by Bank: November 19, 1993

Date EA Category Assigned: October 26, 1993

MAJOR PROJECT COMPONENTS:

Water supply mains and sewerage collectors.

MAJOR ENVIRONMENTAL ISSUES:

Interference in roads during construction, possible impact on wetlands.

OTHER ENVIRONMENTAL ISSUES:

To be analyzed during project preparation.

PROPOSED ACTIONS:

To be further developed.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Possible impact on wetlands.

REPORTING SCHEDULE:

Summary submitted to Executive Directors on November 23, 1993.

REMARKS:

To be further developed during project appraisal.

I-91

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CARIBBEAN RE Project ID No: 6CRBPA013Project :OECS Waste ManagementAppraisal Date : January 17, 1994 IBRD Amount ($m): 5.80Board Date : September 29, 1995 IDA Amount (Sm): 5.70Managing Division : LA3IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: To be determinedDate EA Category Assigned: Sept. 18, 1992

MAJOR PROJECT COMPONENTS:

Investments in Solid Waste (Port collection for ships; sanitarylandfills; waste collection enhancement; waste minimization/recycling;institution strengthening and public education); Technical Assistance forLiquid Waste Management; and a regional component to establish a workableinstitutional framework for regional coordination in Waste Management.

MAJOR ENVIRONMENTAL ISSUES:

Project developed to alleviate environmental degradation from solidwastes of Coastal Zones and the Caribbean Sea in support of the "SpecialArea" designation under IMO in support of MARPOL.

OTHER ENVIRONMENTAL ISSUES:

In landfill, potential pollution of surface or groundwater fromleachates; build-up (explosions) of landfill gas; nuisance smell, dust, fire;potential impacts on local human or biotic communities.

PROPOSED ACTIONS:

All of these and other impacts have been addressed in sanitary landfilldesign.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

To ensure the environmental integrity of the proposed landfill sitesfinanced under the project.

REPORTING SCHEDULE:

November, 1993 - EA start-up date.

REMARKS:

Assessment of the solid waste sector has been conducted. A summary ofthe environmental work to date will be prepared before appraisal. Anynecessary additional work (including public consultations) will be conductedunder site-specific EAs after appraisal.

I-92

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : GUYANA Project ID No: 6GUYPA028Project :Bauxite Rehabilitation

Appraisal Date :July 15, 1994 IBRD Amount (Sm): 20.00Board Date :July 15, 1995 IDA Amount ($m): 25.60Managing Division : LA3TF Sector: Mining & other ExtractiveLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: 3rd Qtr F494

Date EA Category Assigned: Dec. 10, 1992

MAJOR PROJECT COMPONENTS:

Assist Bauxite sector with ongoing privatization and rehabilitationexports to improve competitiveness, develop new products and increase sales.

MAJOR ENVIRONMENTAL ISSUES:

Lack of satisfactory land reclamation in mined-out areas resultingin adverse environmental effects; insufficient dust control in Bauxiteplant.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Initiate environmental impact assessment through Bauxite IndustryTA project after (a) Guyana has agreed with Bank and IMF on structural

adjustment program; and (b) Bank and Government have agreed under whichconditions Bank financing for Bauxite industry rehabilitation could be

considered.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Significant environmental impacts already present and rehabilitation

of new processing plant could contribute to alleviation of these inpacts.

REPORTING SCHEDULE:

To be developed.

REMARKS:

N/A

1-93

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : MEXICO Project ID No: 6MXCPA116Project :Solid Waste IIAppraisal Date : March 15, 1994 IBRD Amount (Sm): 2200.C0Board Date : October 18, 1994 IDA Amount ($m):Managing Division : LA2IE Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: 2nd Qtr 1994Date EA Category Assigned: May 13, 1993

MAJOR PROJECT COMPONENTS:

The project would support a national solid waste program and wouldinclude: (i) an institutional development component designed principally tostrengthen SEDESOL's capacity to provide guidance and assistance tomunicipalities and to monitor compliance with environmental norms. Thincomponent would finance training and technical assistance to strengthen thetechnical, managerial and regulatory capacity of SEDESOL, BANOBRAS and themunicipalities in coordination with other existing and proposed Bank loans;and (ii) an investment component, which would finance (a) civil worksincluding closing of open dumps, construction of transfer stations,landfills, incineration plants, containment cells, recycling and compostingplants, and access roads; (b) purchase of equipment, vehicles and spare partsfor collection, transport and final disposition; (c) training, equipping andresettling of scavengers (including provision of basic infrastructure); and(d) consulting services to: (i) prepare engineering designs and environmentalassessments of investments for subprojects; and (ii) supervise subprojectimplementation and system operation.

MAJOR ENVIRONMENTAL ISSUES:

Although the project would have a strong positive impact on theenvironment in beneficiary cities, it entails closure of existing dumps,establishment of sanitary landfills and access roads, construction ofincineration, handling of infectious waste and resettlement of scavengerpopulations.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Complete environmental impact assessments will be prepared as part ofthe Master Plan to identify and include preventive and corrective actionswhich may be required in each of the financed subprojects to mitigatepossible negative impacts. In addition, a sectoral EA will be prepared inorder to identify institutional strengthening needs at the national, stateand local levels and procedures for EA of future solid waste projects.SEDESOL's capacity to monitor municipal compliance with environmental normswould be strengthened. Social and economic studies are being carried out inorder to identify alternatives to solve the scavenger issue for major dumps.Resettlement policies and plans are to be defined and prepared.

I-94

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Siting of landfills, waste incineration and involuntary resettlement ofscavengers.

REPORTING SCHEDULE:

Start-up - September 1993; first draft - November 1993; Status - Underpreparation.

REMARXS:

To be determined.

I-95

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :MEXICO Project ID No: 6MXCPA215Project :Northern Border I EnvironmentAppraisal Date : January 24, 1994 IBRD Amount ($m): 350.00Board Date :May 17, 1994 IDA Amount ($m): 0.00Managing Division : LA2C1 Sector: EnvironmentLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Oct. 1993Date EA Category Assigned: June 1993

MAJOR PROJECT COMPONENTS:

1. Water quality, air quality, and solid waste management.2. Industrial pollution abatement.3. Institutional strengthening.

MAJOR ENVIRONMENTAL ISSUES:

1. Design and location of landfills.2. Resettlement of scavengers.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

For (1) and (2): Comprehensive BAs of at least 30% of the investmentsin solid waste disposal facilities envisaged under the project (i.e. 3-4sites) and a sectoral EA of BANOBRAS to be conducted before appraisal.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Project is classified "A" because of the solid waste component whichrequires finding adequate sites for the landfills and incinerators.

REPORTING SCHEDULE:

Sectoral EA and comprehensive EAs for 3-4 sites to start in August1993. Completion date: January 1994 - Detailed schedule not known yet.

REMARKS:

None.

1-96

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : PARAGUAY Project ID No: 6PARPA071Project : Natural Resources ManagementAppraisal Date :June 08, 1992 IBRD Amount ($m): 50.00

Board Date :February 22, 1994 IDA Amount ($m): 0.00Managing Division : LA4AP Sector: AgricultureLending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: June 1992Date EA Category Assigned: April 20, 1990

MAJOR PROJECT COMPONENTS:

Regional agricultural development in the Departments of Alto Parana and

Itapua (norte) including infrastructure, agricultural services, environmental

protection and institutional strengthening.

MAJOR ENVIRONMENTAL ISSUES:

The major environmental issues present in the project area include

deforestation for agricultural purposes, without land use planning or use

of soil conservation technology; erosion of the natural habitat of the

indigenous communities; and steadily increasing population pressures on land

resources.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Detailed design of watershed management and resource conservation is

being undertaken using a PHRD grant.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Important environmental issues, which have been dealt with directly inthe project's design.

REPORTING SCHEDULE:

The EA preparation process was discussed with the borrower during thepre-appraisal mission (Feb 11-29, 1992). The draft report was provided to theappraisal mission in June 1992, and the final version plus English languagesummary were provided at the end of July 1992. The EA Summary was

distributed to the Executive Direstors in September 1992.

REMARKS:

The Government of Paraguay has given its permission to release the EA

report.

1-97

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : PARAGUAY Project ID No: 6PARPA079Project : Asuncion SewerageAppraisal Date : February 15, 1994 IBRD Amount ($m): 17.00Board Date :November 15, 1994 IDA Amount (Sm):Managing Division : LA4IE Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: January 1994Date EA Category Assigned: Sept. 15, 1992

MAJOR PROJECT COMPONENTS:

Collection and disposal of sewage for about 250,000 inhabitants inAsuncion.

MAJOR ENVIRONMENTAL ISSUES:

None major; studies for treatment and environmental impact required.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

To be developed.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

It involves: (i) construction activities of significant magnititude inan urban area; (ii) disposal of solid and possibly hazardous liquid wastesfrom the at-source treatment of industrial waste waters; (iii) discharge ofadditional sewage into the Paraguay River; and (iv) potential resettlement ofpopulation.

REPORTING SCHEDULE:

EA under preparation. Completion scheduled for mid-January 1994.

REMARKS:

None.

1-98

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :TRINIDAD & T Project ID No: 6TRIPA032Project : Export Infrastructure DevelopmentAppraisal Date : October 16, 1994 IBRD Amount ($m): 30.00Board Date :July 15, 1995 IDA Amount ($m):Managing Division :LA3TF Sector: IndustrialLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: 2nd Qtr, FY95Date EA Category Assigned: Dec. 15, 1992

MAJOR PROJECT COMPONENTS:

Industrial estate and port.

MAJOR ENVIRONMENTAL ISSUES:

Site remediation, protection of beach, risk hazard from LNG plant.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Studies to be carried out to define mitigation plan.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Discrete investment projects with terrestrial and marine impact.

REPORTING SCHEDULE:

To be developed.

REMARKS:

At the request of the Government, Bank processing of this project hasbeen suspended for the time being.

I-99

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : URUGUAY Project ID No: 6URUPA065Project :Irrigation Natural Resource ManagementAppraisal Date : June 29, 1993 IBRD Amount ($m): 42.00Board Date : January 11, 1994 IDA Amount ($m): 0.00Managing Division :LA4AP Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: June 1993Date EA Category Assigned: August 21, 1992

MAJOR PROJECT COMPONENTS:

(a) Natural Resource Management including: (i) soil and waterconservation/management "pilot" projects and demonstration farms; (ii) theestabishment of a Geographical Information System; (iii) applied research andtechnology transfer and studies; and (iv) forestry development andinstitutional strengthening; (b) Irrigation Development consisting of: (i)rehabilitation and modernization of existing public irrigation and drainageschemes; (ii) construction of new medium-size collective irrigation schemes;(iii) construction of small-scale earthfills, tubewells and pumping stations;and (iv) technical assistance for feasibility and environmental assessmentstudies and for the promotion of marketing of (mostly irrigated )non-traditional export crops.

MAJOR ENVIRONMENTAL ISSUES:

The project would support irrigation development in the generalvicinity of internationally important wetlands (some located within a RamsarTreaty wetland area). Irrigation, drainage, and flood control works could alsostimulate deforestation of riverine forests.

OTHER ENVIRONMENTAL ISSUES:

Increased agro-chemical use; eutrophication of irrigation ponds andcanals.

PROPOSED ACTIONS:

Careful environmental screening of each subproject to avoidencroaching into the wetland areas and support for improved protection ofdesignated wetlands. No subprojects will be carried out within the area ofthe Ramsar Treaty.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Possible irrigation development subprojects in an area ofenvironmentally sensitive wetlands.

REPORTING SCHEDULE:

Completed. Environmental Assessment Summary distributedto the Exevutive Directors by June 1993.

REMARKS:

I-100

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Executive summary of the EA and the environmental profiles of selectedirrigation projects prepared by M. Nelson, environmental consultant, December

1992.

1-101

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : AZERBAIJAN Project ID No: 7AZEPAOO1Project : EnergyAppraisal Date s April 04, 1994 IBRD Amount ($m): 20.00Board Date : September 13, 1994 IDA Amount (Sm):Managing Division : EC31V Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned: November 30, 1993

MAJOR PROJECT COMPONENTS:

Technical assistance for petroleum, gas, and power enterprises.

MAJOR ENVIRONMENTAL ISSUES:

Major environmental issues include: spills and leaks from oil and gaspiplines, prevention of corrosion of materials, cleanup of historic damages,environmental mitigation, monitoring and emergency response.

OTHER ENVIRONMENTAL ISSUES:

Some of the technical assistance involves advising on environmentalissues (in a broader context).

PROPOSED ACTIONS:

N/A

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

REPORTING SCHEDULE:

REMARKS:

None.

I-102

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CROATIA Project ID No: 7CROPA003Project :TransportAppraisal Date : May 29, 1995 IBRD Amount (Sm): 75.00Board Date : December 27, 1995 IDA Amount ($m):Managing Division : EC2IN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: LendingDate for receipt of EA by Bank: ReceivedDate EA Category Assigned: May 1993

MAJOR PROJECT COMPONENTS:

1994-1996 Road Expenditure Programs; programs to privatize roadcontractors and trucking companies and improve road safety. Measures toreduce subsidy and prepare to improve the roadways.

MAJOR ENVIRONMENTAL ISSUES:

None.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

N/A

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Construction of road on new alignment.

REPORTING SCHEDULE:

EA summary for one road section sent to Board. Summary for adjacentroad section now incldued in project will be sent to Board following decisionto appraise (see below).

REMARKS:

Decision to appraise subject to the resolution of country issues.

I-103

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : CZECHOS. Project ID No: 7CZKPA010

Project : Energy IIAppraisal Date : July 01, 1994 IBRD Amount (Sm): 200.00Board Date : January 02, 1995 IDA Amount (Sm): 0.00Managing Division : EC2EE Sector: EnergyLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank:Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

In early stages of preparation, but the project may include one or moreof following components: a) gas pipeline to enhance country's supply system;b) increase in gas storage capacity; c) TA.

MAJOR ENVIRONMENTAL ISSUES:

Pipeline route is to follow existing pipelines in operation, issues ofdisruption to physical and social infrastructure expected to be minimal butneed evaluation; impact of reduced gas emissions on global environment.environment.

OTHER ENVIRONMENTAL ISSUES:

To be identified as project definition becomes firmer.

PROPOSED ACTIONS:

To carry out environmental assessment in parallel with preparation.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Construction or rehabilitation of gas infrastructure must meet safety andsecurity aspects. (Category could be changed to B depending on which exactproject components are included, for example if pipeline component isultimately dropped or for other reasons.)

REPORTING SCHEDULE:

EA to be started in June/July 1992.

REMARKS:

None.

1-104

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :ESTONIA Project ID No: 7ESTPA002Project :EnergyAppraisal Date : February 01, 1994 IBRD Amount (Sm): 30.00Board Date : May 24, 1994 IDA Amount ($m):Managing Division :EC4IN Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Late 1993Date EA Category Assigned: Jan. 1, 1993

MAJOR PROJECT COMPONENTS:

The project is expected to consist of the following components:

(a) boiler conversion program in small towns and counties - Category A;(b) district heating rehabilitation program in Tallinn, Tartu and Parnu

- Category B;(c) Iru {Tallinn) Power Plant fuel conversion, energy efficiency and

environmental improvements - Category B; and(d) institutional support program for project agencies - Category C.

MAJOR ENVIRONMENTAL ISSUES:

The boiler conversion program would promote the use of indigenous woodand peat resources for use in small and medium boilers used for districtheating systems. Similar programs are currently conducted in adjacentNordic countries; however, Estonia has not analyzed the potentialenvironmental impacts associated with these types of programs nor evaluatedthe regulatory, management and monitoring requirements to assure these typeof activities be conducted in an environmentally sound manner. AlthoughEstonia has extensive forest and wetlands, it will be critical to identifywhich areas, for reasons of nature conservation and hydrologic management,should not have wood or peat harvesting occur or which should have harvestingconducted using special techniques. The use of fuels also has to beevaluated with regard to potential air quality, transport storage and ashdisposal issues.

OTHER ENVIRONMENTAL ISSUES:

The district heating rehabilitation program will focus on improvingenergy efficiency; environmental issues are principally restricted to theselection of materials for insulation and the disposal of waste.

The Iru Power Plant fuel conversion program will support the use ofnatural gas in a plant presently burning oil. It wlll also focus onimprovements to increase fuel use efficiency, rehabilitation of watertreatment system and the installation of air quality monitoring equipment.

PROPOSED ACTIONS:

The boiler converstion program would be the subject of a programmaticenvironmental assessment prepared consistent with Estonian and World Bankrequirements. It would evaluate the potential short, medium and long-termenvironmental impacts, management and monitoring issues associated with the

1-105

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

harvesting of peat and use of wood chips as fuel in heating systems.

An environmental review would be prepared for the district heatingrehabilitation program and the Iru Power Plant program, which would includepreparation of an environmental mitigation plan.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The boiler conversion program would introduce into Estonia a newtechnology which, due to the serious shortage of hard currency available forthe import of fuels, would lead to medium, if not long-term reliance, onindigenous fuels for heating. The Government of Estonia has indicated thatupon successful demonstration of these technologies, it would seek fundingfrom multiple sources and it would expand the use of indigenous fuels forheating. This provides the justification for preparation of a programmaticenvironmental assessment.

The district heating rehabilitation program and Iru Power Plant fuelconversion focus directly on the improvement of the use of energy, use ofcleaner fuels and in the case of the Iru Power Plant, the installation ofenvironmental monitoring equipment. The potential impacts from theseprojects are generally positive; potential adverse impacts would be highlylocalized and could be effectively addressed through an environmentalmitigation plan.

REPORTING SCHEDULE:

A draft terms of reference has been prepared for the programmaticenvironmental assessment and discussions have been initiated with potentialbilateral and multilateral sources for funding the study. It is anticipatedthat the assessment will begin during the first half of 1993.

REMARKS:

The scope of the environmental assessment has been discussed with theMinistry of Environment and Natural Resources and the Ministry of Economy.An environmental assessment coordinator has been nominated by the Ministry ofEnvironment and Natural Resources.

I-106

ENVIRONMENTAL DATA SHEET FOR CATEGORY "All PROJECTS

Country :HUNGARY Project ID No: 7HUNPA045Project : Energy/EnvironmentAppraisal Date :November 23, 1992 IBRD Amount (Sm): 100.00Board Date : March 06, 1994 IDA Amount ($m): 0.00Managing Division :EC2EE Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Sept. 1992Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

The project involves: (i) the construction of a gas fired combinedcycle co-generation plant; {ii) the upgrading of MVM's (the HungarianElectricity Company) Energy Management System (EMS) at the NationalDispatch Center and Regional Dispatch Centers; (iii) technical assistance toupgrade the human resources management, training and generally theinstitution building capacity in the power sector; and (iv) assistance toreinforce the environmental management and monitoring capability in thesector through development of a master plan, air and water quality andnoise level monitoring programs and related training.

MAJOR ENVIRONMENTAL ISSUES:

(a) Atmospheric emissions and standards compliance at the powerstations; (b) noise; and (c) disturbances to the terrain and propertiesduring construction.

The legal procedures to obtain formal licenses for constructingprojects such as those under consideration is being finalized. The processincludes approvals for environmental measures, some from municipalities,others from state government authorities.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Design features to comply with environmental assessment's proposalwould be included in component (i).

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

N/A

REPORTING SCHEDULE:

A satisfactory EA was received prior to appraisal mission departure.Nine questions concerning the EA were sent to the Borrower prior to missiondeparture and were resolved during appraisal. Mitigation measures for noisehave been included in the project design. Some issues raised by the appraisalmission regarding an quality impacts were further analyzed by the Borrower andthe results received indicated no adverse impacts and compliance with

I-107

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Hungarian and World Bank air quality standards. The project has receivedclearances from regional environment division (EMTEN).

REMARKS:

None. Executive summary of EA transmitted to Executive Directors Nov.29, 1992.

I-108

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :KYRGYZ REPUB Project ID No: 7KYRPA011

Project : Aral Sea Program - Phase IAppraisal Date :October 10, 1994 IBRD Amount ($m): 50.00

Board Date :March 16, 1995 IDA Amount (Sm): 10.00Managing Division :EC3C1 Sector: EnvironmentLending Instrument: Sector Investment and Maintenance Status: Standby

Date for receipt of EA by Bank:Date EA Category Assigned: November 23, 1993

MAJOR PROJECT COMPONENTS:

- North Sea dike- potable water supply

- sanitation and sewerage

MAJOR ENVIRONMENTAL ISSUES:

Dessication of Aral Sea; destruction of the biodiversity, contamination

of potable water, adverse sanitation and sewerage problems.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

The Aral Sea Program Phase I has been identified. Required institutionshave been decided to plan and implement the program. Arrangements are beingmade to prepare the projects.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The Aral Sea disaster has been recognized internationally. Manyorganizations have been working on the solutions. Bank assistance has been

requested by the Aral Sea states.

REPORTING SCHEDULE:

UNEP's study of July 1992.

World Bank's paper on Aral Sea Crisis, March 1993.

REMARKS:

None.

I-109

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : LITHUANIA Project ID No: 7LTHPA004Project :Energy/EnvironmentAppraisal Date : January 15, 1994 IBERD Amount (Sm): 70.00Board Date : May 10, 1994 IDA Amount (Sm):Managing Division : EC4IN Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Nov. 1, 1993Date EA Category Assigned: Mar. 30, 1993

MAJOR PROJECT COMPONENTS:

Rehabilitation of thermal power units, emissions controls, transmissionsystem upgrading, district heating system upgrading, boiler conversion.

MAJOR ENVIRONMENTAL ISSUES:

Use of wood chip requires careful coordination with forest managementand provisions for ash disposal. Other Environmental Issues: The totalemissions from the rehabilitated boilers could be higher than at presentif they operate for more hours than in the past or use fuel with highersulfur content.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

Modifications will be made to project components as needed.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Relatively minor environmental impacts are expected. Remedial measurescan be taken to mitigate impacts if any. Rehabilitation of plant will resultin environmental benefits. Use of wood chips will be done in a regulatedmanner to be compatible with forest management.

REPORTING SCHEDULE:

EA studies to be conducted in random for the three Baltic states.Contract expected in August. Draft report in November 1993, in time forappraisal.

REMARKS:

None.

I-110

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : RUSSIA Project ID No: 7RUSPA004Project : Oil Rehabilitation IIAppraisal Date : January 24, 1994 IBRD Amount (Sm): 500.00Board Date : June 02, 1994 IDA Amount (Sm):Managing Division :EC3IV Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: October 1992Date EA Category Assigned: April 1992

MAJOR PROJECT COMPONENTS:

(a) Workover and rehabilitation of shut-in production oil wells; (b)completion of wells already drilled and connection of these to the surfaceinfrastructure; (c) limited in-fill drilling of wells in existing fields; (d)replacement of oil gathering lines and production flow lines; (e) provisionof oil field services; and (f) technical assistance.

MAJOR ENVIRONMENTAL ISSUES:

Major environmental issues include: control of spills and leaks,cleanup of historic damages, control of erosion and revegetation, etc.

The project focusses on existing fields and does not Involve"greenfield" sites. In fact, one project component, replacement of oilgathering lines and production flow lines will reduce oil leakages andthus address an important environmental emissions. Also, introduction ofwestern technology will have a mitigating effect on environmentaldisturbance. Environmental mitigation monitoring and emergency responseissues would also be considered.

OTHER ENVIRONMENTAL ISSUES:

(a) Air pollution from flared associated gas (see comment above); (b)dredging of sand from local rivers and lakes to construct drill pads; and (c)risk of oil spillage.

PROPOSED ACTIONS:

(a) Strengthening of Nature Protection Units at Oil Associations,through provision of oil spill clean-up equipment, laboratory supplies, andtraining; and (b) careful selection of dredge areas for drilling pads.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

As required under OD 4.01 this is an oil production project.Environmental "All category is assigned to this project.

REPORTING SCHEDULE:

Draft EA summary to be circulated to Board prior to Appraisal,January 1993. Final EA submitted by borrowers March 1993.

REMARRS:

I-111

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Consultations held with Khanti-Mansi indigenous peoples in November,1992.

ENVIRONMENTAL DATA SHEET FOR CATEGORY '?A" PROJECTS

Country : RUSSIA Project ID No: 7RUSPA029Project Environmental InvestmentAppraisal Date : September 12, 1994 IBRD Amount ($m): 300.00Board Date :March 03, 1994 IDA Amount (Sm):Managing Division : EC3IV Sector: EnergyLending Instrument: Specific Investment Loan Status: Lending

Date for receipt of EA by Bank: December 15, 1993Date EA Category Assigned: August 3, 1993

MAJOR PROJECT COMPONENTS:

Associated gas processing facilities, compressors and pipelines forassociated gas and its products; lean gas and natural gas liquids (NGLs).

MAJOR ENVIRONMENTAL ISSUES:

Currently associated gas and NGLs are being flared to the environment.Safety issues related to the pipeline transport of highly flammable NGLs.Major environmental issue is air pollution which is having serious impacts onvegetation, population, and the surroundings.

OTHER ENVIRONMENTAL ISSUES:

Construction impacts on the environment for pipeline and facilities.Minimal relocation of pipeline.

PROPOSED ACTIONS:

Gas processing facilities and pipelines will be built to best westernenvironmental and safety standards, thus enabling the collection and

subsequent distribution of gas now being flared to the environment.

Appropriate safety distances will be maintained according to internationallyaccepted standards, and other operating improvements to provide safer

transfer to rail cars will be identified and implemented. A pilot regulatoryagency based on North American practice will be set up at regional level tocontrol oil and gas operations in Western Siberia to maximize oil and gas

recoveries according to the provisions of the new Oil and Gas ConservationLaw.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

An "A" category has been designated because of the safety issuesarising from the operation of pipelines carrying highly flammable liquids

under pressure and the transfer to rail tank cars for export.

REPORTING SCHEDULE:

An EA will be carried out at the time of the project feasibility studyas an integral part of the study. The study began in May 1993 and will becompleted by December 15, 1993.

REMARKS:

I-113

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Local NGOs and communities will be consulted during the process of thecarrying out of the EA and the results presented in public meetings todiscuss the findings of the EA.

I-114

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :UZBEKISTAN Project ID No: 7UZBPA002Project : Cotton Subsector ImprovementAppraisal Date : March 11, 1994 IBRD Amount (Sm): 50.00Board Date :August 16, 1994 IDA Amount ($m): 50.20Managing Division : EC3AI Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned: Dec. 14, 1992

MAJOR PROJECT COMPONENTS:

(1) Machinery and equipment for cotton production, de-linting, storage,grading and ginning; (2) cotton production inputs; (3) institutionaldevelopment; and (4) policy reform.

MAJOR ENVIRONMENTAL ISSUES:

Present mode and scale of irrigated cotton production has caused severeenvironmental degradation including the shrinking of the Aral Sea,destruction of fish resources in the Aral Sea, land degradation and increasedsalinization, increased crop diseases and insect infectation, and increasedhealth risks to the human and animal population, due to water and airpollution from pesticides and fertilizers. Priority issues: regulation,management of pesticide use, irrigation/drainage/water use systems design andmanagement, and air and water pollution from cotton production andprocessing.

OTHER ENVIRONMENTAL ISSUES:N/A

PROPOSED ACTIONS:

A major project objective is to mitigate the negative environmentalimpact of pesticide and fertilizer use in cotton production by eliminatingsubsidized input prices, promoting integrated pest management and supportingpolicy and regulatory reform concerning pesticide use and management.Project environmental assessment required and would be completed beforeproject appraisal scheduled for March 1994.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Anticipated Category: A due to components concerning: (1) cottonprocessing and ginning (large-scale industrial plants); (2) pesticideregulation and use. Also indirect impact of the present mode and scale ofwater use, irrigation and drainage activities for cotton production.

REPORTING SCHEDULE:Nothing completed to date.

REMARKS:None.

1-115

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :BANGLADESH Project ID No: 8BANPA176Project :Jamuna Multi Purpose BridgeAppraisal Date :September 04, 1993 IBRD Amount ($m): 0.00Board Date : January 04, 1995 IDA Amount (Sm): 210.00Managing Division :SAlEI Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: CompletedDate EA Category Assigned:

MAJOR PROJECT COMPONENTS:

This project aims to stimulate economic growth by providing landtransport of electricity, passenger and freight traffic and, potentially,natural gas and telecommunications between the northwest quadrant and theeastern half of the country. Components include a four lane bridge, bridgeapproaches, river training works technical assistance and training.

MAJOR ENVIRONMENTAL ISSUES:

Potential pollution and erosion during construction; interferencewith drainage; increased river bank erosion; disruption of agriculturalpractices including loss of agricultural land requiring involuntaryresettlement; possible impact on fisheries, wildlife, navigation, and reduceddry-season crop yield through closure of northern Dhaleswari River; riskof explosion or fire from gas pipeline; seismic risks; risk of accidentduring road transport of hazardous materials; bridge and adjunct highwaysmay induce uncontrolled development.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

An EA has been prepared as part of the feasibility study.Construction would be planned and managed to minimize impacts duringconstruction. Plans now being formulated for resettlement and formitigating impacts on drainage, fisheries and agriculture, and forcontrolling land use would be implemented. An environment cell has beenestablished in the implementing agency, expert consultants would be providedand its staff trained.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Potential impacts are significant.

REPORTING SCHEDULE:

Supplementary resettlement, fisheries and wildlife studies andplans are under preparation. Studies on mitigation of effects in the upperDhaleswari and the master plan are in progress. Mitigating measures willbe incorporated into final planning and design for implementation. Theinitial EA is available now. The other studies would be available prior to

I-116

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

appralsal.

REMARKS:

The affected people have been initially consulted as part of thestudies for Dhaleswari River closure mitigation and the involuntaryresettlement process, and this will be continued as part of the projectpreparation process.

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : BANGLADESH Project ID No: 8BANPA200Project : Gas Infrastructure DevelopmentAppraisal Date : May 18, 1993 IBRD Amount ($m):Board Date : December 13, 1994 IDA Amount (Sm): 165.70Managing Division : SAlEI Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: May 21, 1993Date EA Category Assigned: Mar. 1992

MAJOR PROJECT COMPONENTS:

Drilling natural gas wells, pipeline and gas treatment facilities, loaddispatch center and telecommunications equipment, metering stations, andtechnical assistance/training.

MAJOR ENVIRONMENTAL ISSUES:

The proposed project entails large scale construction with thefollowing potential issues: impact on natural resources; public and workersafety and risk; land acquisition/requisition (no significant resettlement isanticipated); temporary traffic, noise, and air/water quality problems alongthe pipeline construction route. Waste water and hazardous waste issues fromdrilling will have to be considered and mitigated.

The cleaner natural gas utilization has several environmental benefitswhich include: reduced reliance on coal and oil; reduced emissions of S02,C02, and particulate; reduced gas leakage through use of better pipelines,leak detection systems, training, and maintenance, will lead to a reductionin global greenhouse gases like methane.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

To facilitate land acquisition and compensation, government revenueofficials will be seconded to the implementing agency to work on site priorto pipeline construction. Public education/awareness process to beginin late 1993.

A Safety Management System is proposed for the implementing agency,with emphasis during construction on inspection, testing, and plannedcommissioning to ensure safe operations.

Patrolling of the pipeline will be carried out daily by foot duringthe dry season to identify erosion problems. Handling of drilling fluids anddrill-cuttings to be specified in construction specifications to minimizeimpact on natural resources.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The project may have significant adverse impacts that may be sensitive

I-118

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

and diverse.

REPORTING SCHEDULE:

EA Start-up date : August 1992EA First Draft : November 11, 1992

Final EA Received by Bank: May 1993Current Status Draft EA Board Summary and Full EA has been

completed by expert consultants on behalf ofthe borrower and has been officiallytransmitted by Government of Bangladesh tothe Bank. The EA was reviewed by theBank's expert and found to be satisfactory.

REMARKS:

A project component is a multi-year plan to strengthen environmental

and safety capacity with technical assistance and equipment which will be

monitored during project supervision.

A safety audit was started in July 1993. The initial stages of the

EA's recommended action plan are already.under implementation. The

regulations framework for safety is being reviewed by the August 1993

post-appraisal mission.

Petrobangla has agreed to hire a local consultant to assist in the

public consultation and monitoring of compensation for the land acquisition

process.

1-119

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDIA Project ID No: 8INDPA317Project : Kerala Urban

Appraisal Date : August 15, 1994 IBRD Amount (Sm): 187.00Board Date : January 31, 1995 IDA Amount ($m): 100.00Managing Division :SA2IN Sector: Urban

Lending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Mar. 31, 1994

Date EA Category Assigned: July 1993

MAJOR PROJECT COMPONENTS:

Group I: (a) water supply (b) sewerage; (c) low-cost sanitation.Group II: (d) roads and traffic management; (e) surface water

drainage; tf) solid waste management;

Group III: (g) urban mapping; (h) improved financial management; (i)

institutional development: TA and personnel training.

MAJOR ENVIRONMENTAL ISSUES:

The project is expected to provide significant environmental

improvement. Potentially significant negative impacts are associated onlywith the solid waste management and sewerage components. Impacts are likely

to be localized and involve siting of facilities, acquisition of land and roadalignments. Resettlement will be required for the roads and trafficmanagement components and possibly other components, i.e., for water supply,

sewerage, drainage, and solid water management.

OTHER ENVIRONMENTAL ISSUES:Noise, dust, and disruption of traffic during construction.

PROPOSED ACTIONS:

Full EA will be prepared for the sewerage and solid waste components.

Site-specific investigations will be conducted for the water treatment plant

in Kochi. Other environmental studies will produce programmatic management

resettlement plan is being prepared for the roads component and surveys

coordinated to determine the need for resettlement in other components.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The project is classifed A because it involves the construction of

sewage treatment works and sanitation landfills which require full EA.

REPORTING SCHEDULE:

TORs have been prepared and approved for EAs and other studies. The

first drafts of EA reports are expected to be submitted to the Bank for

review before March 31, 1994.

REMARKS:None.

1-120

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDIA Project ID No: 8INDPA379Project : Haryana Water Resource ConsolidationAppraisal Date :October 20, 1993 IBRD Amount ($m): 80.00Board Date :April 19, 1994 IDA Amount ($m): 250.00Managing Division :SA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate for receipt of EA by Bank: Sept. 1993Date EA Category Assigned: Mar. 8, 1993

MAJOR PROJECT COMPONENTS:

The objective of the proposed project would be to strengthen the abilityof Haryana Irrigation Department to fulfill its mandate and to addressoperational, policy and institutional issues (including environmental issues)linked with irrigation. Components would include: (a) improvement of basicdata collection, planning and design of irrigation projects, including riverbasin planning, economic and technical feasibility studies, and environmentalassessments; (b) completion of ongoing high priority irrigation projects,dependent on a re-evaluation of economic, technical and environmentalfeasibility; (c) support for adequate operations and maintenance of existingschemes; (d) improvement of regulatory functions (dam safety, flood controland water quality among others; (e) policy reforms to increase cost recovery;and (f) institutional reforms aimed at rationalizing the state IrrigationDepartment, introducing increased accountability, strengthening budgeting andfinancial management, and training.

MAJOR ENVIRONMENTAL ISSUES:

Environmental issues include issues typically encountered by irrigationagencies in the course of their work. However, some specific issues willonly materialize while the project is underway, given the flexibile nature ofproject financing. The more important objective is to create capabilities andprocedures within the state so that better monitoring, environmentalassessment, design and implementation relative to environmental concerns canbe done in the future; matters that would be incorporated in the projectdesign.

OTHER ENVIRONMENTAL ISSUES:

Drainage to be incorporated in project and also being studied underongoing North-West Drainage Study.

PROPOSED ACTIONS:

The project would strengthen the ability of Haryana IrrigationDepartment to plan, implement and monitor irrigation and drainage developmentresponsive to environmental concerns. Project preparation would involvepreparation of an agreed action plan to create institutional capability tohandle environmental matters comprising creation of expertise, institutionalcapability, institutional linkages and guidelines and procedures to carry outenvironmental assessments, collect data on environmental issues, and regulatewater quality. A Water Resources Planning Unit has been established in theHaryana Irrigation department. An Environmental Group would be created in

I-121

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

the Planning Unit to upgrade environmental capability. There are no ongoingor anticipated future R&R needs in Haryana, which has fully developed itswater storage and main distribution system.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

A "Sector Loan" type of EA has been conducted (OD 4.00), best fittingthe objectives of the project (refer Minutes of India Water ResourcesCommittee meeting, with ASTES, of March 8, 1993). This emphasizescarrying out an environmental action plan to improve the institutional,technical and procedural capabilities in the states for monitoring andhandling water related environmental issues. While the project (through-better water planning, water distribution, drainage and better capabilitiesfor measuring environmental inputs) will have a positive environmentalimpact, an A category has been proposed (formerly left undetermined). The EAconcluded that project activities would have no adverse environmentalimpacts.

REPORTING SCHEDULE:

Final consultant report submitted August 1993. This includesagreements with HID on actions and establishment of Environment Group.

REMARKS:

None.

I-122

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDIA Project ID No: 8INDPA394Project : Coal Sector RehabilitationAppraisal Date : January 13, 1994 IBRD Amount (Sm): 500.00Board Date : May 31, 1994 IDA Amount ($m): 0.00

Managing Division : SA2EG Sector: Mining & other ExtractiveLending Instrument: Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned: September 9, 1993

MAJOR PROJECT COMPONENTS:

The proposed project supports reform efforts to make the coal industry

commercially viable and eliminate its dependence on budget resources. Some

of these reforms, such as the closure of mines and the retrenchment of

miners, are quite costly. The main objective of the project is therefore to

strengthen the coal industry financially, so as to permit the industry to

maintain the momentum of implementing reforms at a time when the Government

is drastically reducing its allocations to the industry. The loan would

therefore finance investments that:* would yield a high financial payoff;* could be implemented quickly; and* would raise the efficiency and profitability of mining operations.

Most investments would involve the expansion of profitable mining operations

or efforts to raise the profitability of mines.

In parallel, the loan would provide financial support for reducing the

adverse impact of coal mining on the people and environment in mining areas

as well as for coal imports; it would also provide technical support for

improving the existing regulatory framework.

MAJOR ENVIRONMENTAL ISSUES:

Air pollution, water pollution, land reclamation, waste disposal, noise,

working conditions and safety at the work place. For issues regardingresettlement and rehabilitation see the Social Issues Sheet.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

(i) Mining investments (e.g., in-mine transportation system, improvedventilation) would only be considered for financing ifenvironmental clearances have been obtained. An environmentalimpact assessment (EIA) would be a condition of eligibility forBank financing of each subproject.

(ii) Before appraisal, Coal India is expected to provide the Bank withEIAs of subprojects covering at least one-third of the proposedloan amount.

(iii) An environmental EA support unit will be established within Coal

India Ltd. that will assist subsidiary coal companies in the

preparation of the EIA for each subproject.

I-123

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

(iv) In the course of project preparation the Bank will review the roleand functions of environmental units that currently exist at eachof the coal-producing subsididary companies of Coal India Ltd.If this review finds that the effectiveness of these units shouldbe strengthened, appropriate recommendations will be made to theborrower, and, if necessary, included in the legal agreements.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Required by OD 4.01. Possible adverse effects on environment andsafety.

REPORTING SCHEDULE:

To be prepared.

REMARKS:

None.

I-124

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :INDIA Project ID No: SINDPA398Project : Port ModernizationAppraisal Date :January 15, 1995 IBRD Amount ($m): 150.00Board Date :October 17, 1995 IDA Amount ($m): 0.00Managing Division :SA2IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: To be determinedDate EA Category Assigned: December 2, 1993

MAJOR PROJECT COMPONENTS:Institutional component with technical assistance and training, partly

focussed at center and partly at the selected ports. Physical component tomodernize selected existing facilities and equipment, including possibleextensions, particularly at JNPT in line with existing master plan.Includes component for anti-pollution equipment and related training.

MAJOR ENVIRONMENTAL ISSUES:The project would have environmental benefits by providing needed

equipment and staff training to combat oil spills and strengthenanti-pollution control cells at selected ports. Civil works would mostly bemodernization (deferred maintenance of existing facilities). However, theremay be some extension of existing port facilities, particularly of JNPT.

OTHER ENVIRONMENTAL ISSUES:None.

PROPOSED ACTIONS:"A" type check list will be used for major civil works. Once the civil

works component has been more clearly defined, particularly possible berthextensions, a decision will be made regarding application of full scale ZIAfor selected components.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:Potential inclusion in the project of important civil works which might

have significant environmental impact.

REPORTING SCHEDULE:

N/A

REMARKS:

None.

I-125

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country :INDIA Project ID No: 8INDPA438Project : Madras Water Supply and Sanitation IIAppraisal Date : April 15, 1994 IBRD Amount (Sm): 200.00Board Date : December 06, 1994 IDA Amount (Sm): 44.00Managing Division : SA2IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: November 1993Date EA Category Assigned; June 1993

MAJOR PROJECT COMPONENTS:

The project has four main components: (i) water supply rehabilitationand expansion; (ii) sewerage system improvements; (iii) environmentalsanitation; and (iv) institutional strengthening.

MAJOR ENVIRONMENTAL ISSUES:

As the proposed Bank-financed project would more than double thedistribution of safe water within the Madras Metropolitan Area and improvesubstantially sanitation conditions in Madras, it would have very positiveenvironmental benefits. Major identified issues include the need fort (i)additional sewerage/sanitation and drainage to handle increased wateravailability; (ii) control of industrial effluents; and (iii) waterconservation measures. A complementary project (Krishna River WaterTransmission Scheme), belng financed solely by the Governments of AndhraPradesh and Tamil Nadu , is now under construction and will supply irrigationwater to Andhra Pradesh (83% of water use) as well as provide the water supplyto Madras for the proposed project (17% of water use). R&R under the Krishnascheme will affect an estimated 1700 persons in Tamil Nadu, including 300-400to be rehabilitated, and a suspected 5000-8000 families in Andhra Pradesh.

OTHER ENVIRONMENTAL ISSUES:

Construction-related local impacts (traffic disruption, dust) and damsafety under the Krishna River Water Transmission Scheme.

PROPOSED ACTIONS:

Consultants have prepared an Environmental Management Plan, whichtogether with provisions in the project for major investments in sewerage,low-cost sanitation and sullage drainage would adequately deal withadditional waste water flow. As part of the preparation of the environmentalsanitation program, consultant studies on hazardous waste and industrialeffluent storm water drainage and solid waste would be carried out with thecoordination of the Madras Metropolitan Development Authority, withrecommendations to be effected during the course of the project. Waterconservation measures under the project would include leak detection,metering, pricing policy and community awareness. An R&R action plan forinside the Tamil Nadu border would be prepared prior to appraisal. Inaddition, the Bank will review and monitor Government of India environmentalclearance, which was given in 1988, including an R&R master rehabilitationplan, for Krishna water transmission scheme works within the AP borders inorder to be able to assess the scheme's likely completion and delivery date

I-126

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

for water to Madras. The review and monitoring exercise will cover residual

R&R covenants, if any, for the Nagarjunasagar and Srisailam Dams. Damsafety assessments will be carried out in AP, as required by the Bank's

guidelines.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

Project category has been upgraded to "Al due to need to broaden both

technical and geographical scope of analysis.

REPORTING SCHEDULE:

Project environmental assessment has been completed by NEERI. During

consultations with local groups, the project was viewed as beneficial and the

beneficiaries were in favor of its expeditious implementation. Additonal EA

work on resettlement and rehabilitation in Tamil Nadu is being carried out

and should be completed by March 1994.

REMARKS:

Persons affected by land loss were not satisfied with monetarycompensation. The Bank is awaiting a status report from MOEF on

environmental and R&R matters in Andhra Pradesh. The Executive Summary is

being released to the Executive Directors.

1-127

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : INDIA Project ID No: 8INDPA441Project : Bombay Sewage DisposalAppraisal Date : April 15, 1994 IERD Amount ($m): 200.00Board Date : September 27, 1994 IDA Amount ($m); 100.00Managing Division : SA2IN Sector: Water Supply & SanitatlonLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: October 1993Date EA Category Assigned: Sep. 30, 1991

MAJOR PROJECT COMPONENTS:

Completion of facilities for the safe disposal of sewage from theGreater Bombay urban area, comprising two three-kilometer long, three-and-a-half meter diameter marine outfall. to dispose of sewage from two of Bombay'sseven drainage zones; two aerated lagoons to treat sewage from two moredrainage zones.

MAJOR ENVIRONMENTAL ISSUES:

(i) Only the first stage of a system for the disposal of Bombay'ssewage will be developed under this project; this will provide for dischargeof sewage at relatively shallow ocean depths and at three kilometers from theshore line after preliminary treatment for the removal of grit andscreenings; this combination of treatment and outfall length will representa tremendous improvement over present conditions under which raw sewage isdischarged at the shore line. However it will not conform to establishedinternational practice, and conventional water quality standards,particularly with respect to bacteriological levels, will not be met underthis first stage of construction. (ii) The quality of effluent from theaerated lagoons, to be constructed under this first stage of development,will be equivalent to that provided by conventional primary treatment ofsewage; again, the improvement over present conditions will be dramatic butthe discharge of this effluent to a tidal creek will not conform toestablished international practice and conventional water quality standards.

OTHER ENVIRONMENTAL ISSUES:

Facilities to remove grit and screenings from sewage from all of theseven drainage zones serving the Greater Bombay urban area have beenconstructed or are under construction. Measures for the safe disposal ofthese wastes are unsatisfactory at present and create an adverseenvironmental impact.

PROPOSED ACTIONS:

(i) Oceans outfalls-Provision will be made in the first stage to allowan increase in the length of the outfalls and/or to construct additionaltreatment facilities in the future. Grant funding has been secured to supportoceanographic modelling studies necessary for the design of the futureworks. TORe have been prepared. (ii) Aerated Lagoons - The basis of lagoondesign is modular, and provision, including the reservation of adequate landareas, is to be made under this first stage of development for extension ofthe lagoons to meet the desired water quality standards in the future.

I-128

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Measures for the safe disposal of wastes comprising grit and screenings will

be identified as part of the environmental assessment and will be implemented

under covenanted action in the proposed project.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

This project is designed to assist Municipal Corporation of GreaterBombay to reduce a serious, adverse environmental impact resulting from the

present practice of indiscriminately discharging untreated sewage and sewageeffluent to water courses and to the shoreline. Because of the magnitude of

the facilities required to effect such improvements, only an initial stage

will be implemented under the project. Although this will vastly improve the

present situation it will not initially meet with internationally accepted

environmental standards.

REPORTING SCHEDULE:

In September 1991, the Municipal Corporation of Greater Bombay engagedconsultants to prepare an environmental management plan for optimumimprovement of environmental quality achieved by the construction of the two

outfalls and lagoons. An initial assessment of the existing receiving waterquality has been prepared. The environmental assessment will be completed by

October 1993.

REMARKS:

The Municipal Corporation of Greater Bombay is obtaining permission ofthe government of India to release the EA. Government of India's formalenvironmental clearance for the project is expected in March 1994.

1-129

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : NEPAL Project ID No: 8NEPPA076Project : Arun HydroelectricAppraisal Date :May 07, 1993 IBRD Amount ($m): 0.00Board Date :October 04, 1994 IDA Amount ($m): 140.00Managing Division :SAlEI Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: March 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

Headworks including 68m high dam; headrace tunnel (11.4 kms long);underground powerhouse for up to 402 MW of generating equipment, switchyard;220 kV power evacuation facilities (including substations and transmissionlines); and a 122 km access road project to be implemented by the NepalElectricity Authority (NEA) in two stages of 201 MW each. First stage hasbeen reformulated based on a review of the financiability of NEA's investmentprogram.

MAJOR ENVIRONMENTAL ISSUES:

(a) Construction of access road could scar countryside through cuttingand filling until vegetation is restored; (b) deforestation due to possibleillegal cutting/export of standing forest; (c) nutrition/general health ofthe construction workforce; (d) acquisition of land along access road rightof way (ROW) and to implement hydroelectric project; (e) conservation offorest, scarce/valuable plants; wildlife and watershed upstream of the dam;(f) control tourism/trekking in the Arun Valley; and (g) institutionalweakness of NEA for addressing hydroelectric project environmental issues.

OTHER ENVIRONMENTAL ISSUES:

N/A

PROPOSED ACTIONS:

(a) To address issues (b)-(c) above, the project tender documentsrequire: (i) bidders to supply information on size of workforce tobe employed as well as location/layout of workcamps; (ii) fuel (petroleum/fuelwood) to be used by contractors from legal sources; (iii) supply of goodsto workforce through fair price shops erected by the contractors andprovision of free medical facilities; (iv) control gates to be manned 24 hrs/day by the contractors to monitor illegal movement of timber; and (v)implementation by the Ministry of Forests and Soil Conservation (MFSC) of anaction plan, agreed with IDA to control illegal logging; (b) development/implementation of a land acquisition, compensation and resettlement plan(ACRP) for the road ROW as well as land to be acquired under thehydroelectric project; (c) institutionalization of an environmentalmanagement unit (EMU) within NEA to address, inter alia, environmental issuesrelated to the hydroelectric project.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

1-130

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

N/A

REPORTING SCHEDULE:

EA summary circulated to EDs May 12, 1993.

REMARKS:

The King Mahendra Trust for Nature Conservation, a Nepali NGO,prepared an environmental management plan for the Arun Basin. All other EAdocementation was prepared by the project consultants.

I-131

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : PAKISTAN Project ID No: 8PAKPA245Project : Sahiwal PowerAppraisal Date December 15, 1994 IBRD Amount ($m): 250.00Board Date December 15, 1995 IDA Amount ($m):Managing Division sA3EI Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: Sept. 1994Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

The proposed project would consist of: la) a management componentinvolving the establishment of corporate entity, which would be responsiblefor implementing the project, and for operating the power plant during theperiod prior to its privatization; (b) an investment component involving thedesign, supply of equipment, installation and commissioning of: (i) a 600 MWcombined-cycle power plant to be set up at Sahiwal, consisting of two blocksof 300 MW each; and (ii) the transmission line and substations for theevacuation of power from the power plant to the main grid; and (c) atechnical assistance component for consultancy services for: (i) projectimplementation and supervision; (ii) preparation of contractual performancearrangements between WAPDA and the corporate entity, including contractualperformance arrangements for the operation of the plant; and (iii)international financial advisory services for the preparation and offer forsale of the corporate entity.

MAJOR ENVIRONMENTAL ISSUES:

The main adverse impacts resulting from the proposed project include:construction impacts from the power station and related transmission network;gas emissions; solid and water waste; relocatin of about 60 families. Bank'sreview would ensure that adequate mitigation measures and resettlement actionplan would be included in project design and processing.

OTHER ENVIRONMENTAL ISSUES:

None.

PROPOSED ACTIONS:

The Environmental Assessment Report of the proposed project is beingfinalized by WAPDA with the assistance of consultants, and on the basis ofBank's comments. The Resettlement Action Plan has still to be established.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The nature, scale, and diversity of potential environmental and socialeffects associated with the implementation and operation of the proposedproject require the preparation of an Environmental and Resettlement Planconsistent with the requirements of GOP and the Bank.

REPORTING SCHEDULE:

I-132

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

As per proposed actions above.

REMARKS:

None.

I-133

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Country : PAKISTAN Project ID No: 8PAKPA280Project : Ghazi-Barotha Hydropower (Phase I)Appraisal Date : February 01, 1994 IBRD Amount (Sm): 25.00Board Date : July 14, 1994 IDA Amount (Sm):Managing Division : SA3EI Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate for receipt of EA by Bank: June 1993Date EA Category Assigned:

MAJOR PROJECT COMPONENTS:

Acquisition of approximately 3,600 hectares of land; relocation of 198families with surveyed population of 980 persons, presently living at thebarrage site, power channel site, and power complex.

The proposed project would support for implementation of the activitiesfor environmental management and resettlement to inlcude: support forinstitutional strengthening and training of environmental and resettlementpersonnel; funding for establishment and initial operations of the projectNGO to implement the social uplift program for integrated regionaldevelopment; relocation of 14 graves; an archaeological salvage program to beconducted by the Archaeological Department of the Government of Pakistan;demonstration activities for development of spoil banks; costs for monitoringconsultants; costs for an international panel of experts to superviseenvironmental and social aspects of the project and special environmentaland/or social studies as required to support preparation of Phase II of theproject.

MAJOR ENVIRONMENTAL ISSUES:

The main adverse impacts resulting from the proposed project inlcude:construction impacts from the barrage, power channel and power complex;changes in the use of approximately 3,600 hectares of land; relocation of 198families with a sureveyed population of 980 persons, presently living at thebarrage site power channel site, and power complex; reduction in flows in asmall portion of the main channel of the upper Indus River when the powercomplex is in operation: creation of potential mosquito habitat in thereservoir formed by the barrage; and local changes in groundwater tables inthe Indus River floodplain and adjacent to the power channel.

OTHER ENVIRONMENTAL ISSUES:

Other environmental issues include: relocation of 14 graves andimpacts to two monitor archaeological sites. In addition, procedures wouldneed to be used to address arachaeological "chance finds" of buried sitesencountered during the course of construction activities.

PROPOSED ACTIONS:

The proposed project has been the subject of an environmentalassessment and required the development of a resettlement plan consistentwith the requirements of the Government of Pakistan. Operational Directive4.01, "Environmental Assessment" and Operationa Directive 4.30, "Involuntary

I-134

ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS

Resettlement". Consideration of environmental and social issues has formedan integral part of the development of the proposed project. These aspectswere considered in detail in the evaluation of lay-out and designalternatives of the proposed project. As the result many potential adverseeffects have been avoided in the design. A detailed program of actions toaddress potential adverse impacts during the course of project implementationis provided by the environmental management/mitigation plan and resettlementplan which would be finalized during appraisal.

JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:

The scale, complexity, and diversity of potential environmental andsocial associated with implementation of the proposed project require thepreparation of an Environmental Assessment and Resettlement Plan consistentwith the requirements of the Government of Pakistan and the Bank.

REPORTING SCHEDULE:

The Borrower has completed an Environmental Assessment Report which iscomplemented by a Supplementary Studies Report and an Archaeological StudiesReport. It has also prepared a detailed Resettlement Plan. These reportshave been reviewed by an international panel of independent environmental andsocial experts comprising Professor Kawata (Chairman, United States),Profes8tor Kindler (Poland) and Mr. A. Dani (Pakistan).

REMARKS:

Preparation of the environmental and social impact studies for theproposed project have included extensive consultation at the national,provincial, district and local level. Village level meetings have beenconducted with groups of both men and women throughout the project area.Consultations, including field visits, have been conducted with local non-governmental organizations inlcuding IUCN/Pakistan, World Wide Fund forNature (Pakistan) and Sungi Development Foundation.

I-135

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :AFR. REGION Project ID No: 3AFRPA021Project : GEPRENAFAppraisal Date : January 10, 1994 IBRD Amount (Sm):Board Date : May 10, 1994 IDA Amount ($m): 10.00Managing Division : AFSAG Sector: Agriculture & Rural DevtLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 8, 1993

Country : ANGOLA Project ID No: 3ANGPA025Project : Agricultural ServicesAppraisal Date : March 31, 1994 IBRD Amount (Sm):Board Date : November 15, 1994 IDA Amount ($m): 20.00Managing Division : AF3AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: October 9, 1992

Country : BENIN Project ID No: 3BENPA056Project : Transport SectorAppraisal Date : October 31, 1994 IBRD Amount (Sm): 0.00Board Date :'July 11, 1995 IDA Amount (Sm): 40.00Managing Division :AFlIN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: July 16, 1993

Country : BENIN Project ID No: 3BENPA060Project : Rural Water Supply and Sanitation SectorAppraisal Date : November 22, 1993 IBRD Amount (Sm):Board Date : April 12, 1994 IDA Amount ($m): 10.00Managing Division : AFIIN - Sector: Water Supply & SanitationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: January 1992m

Country : BURUNDI Project ID No: 3BUIPA048Project : Natural Resource ManagementAppraisal Date : March 15, 1993 IBRD Amount ($m): 0.00Board Date : March 22, 1994 IDA Amount (Sm): 2.00Managing Division : AF3AE Sector: AgricultureLending Instrument: Sector Adjustment Loan Status: LendingDate EA Category Assigned: November 4, 1991

I-136

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country s BURKINA FASO Project ID No: 3BURPAOSS

Project : Urban EnvironmentAppraisal Date : March 01, 1994 IBRD Amount (Sm): 0.00Board Date :January 17, 1995 IDA Amount (Sm): 40.00Managing Division :AF5IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 23, 1993

Country :CHAD Project ID No: 3CHDPA052Project : Public Works and Capacity BuildingAppraisal Date : November 06, 1993 IBRD Amount (Sm):Board Date : March 29, 1994 IDA Amount (Sm): 20.00Managing Division : AF5IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: April 8, 1993

Country : ETHIOPIA Project ID No: 3ETHPA096Project : National SeedsAppraisal Date : February 20, 1992 IBRD Amount (Sm): 0.00Board Date : September 01, 1994 IDA Amount ($m): 40.00Managing Division : AF2AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : ETHIOPIA Project ID No: 3ETHPA097Project : National FertilizerAppraisal Date : June 28, 1993 IBRD Amount (Sm): 0.00Board Date : June 23, 1994 IDA Amount (Sm): 100.00Managing Division : AF2AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 23, 1992

Country : ETHIOPIA Project ID No: 3ETHPA115Project :Social FundAppraisal Date : January 05, 1994 IBRD Amount (Sm):Board Date : June 09, 1994 IDA Amount (Sm): 20.00Managing Division :AF2PH Sector: SocialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 1, 1993

1-137

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : GHANA Project ID No: 3GHAPA092Project :Community Water & SanitationAppraisal Date : June 23, 1993 IBRD Amount (Sm): 0.00Board Date : March 15, 1994 IDA Amount (Sm): 37.00Managing Division : AF4IN Sector: Water Supply & SanitationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: October 1991

Country : GHANA Project ID No: 3GHAPA104Project : Local Government DevelopmentAppraisal Date : June 18, 1993 IBRD Amount ($m): 0.00Board Date : February 15, 1994 IDA Amount ($m): 40.00Managing Division : AF4IN Sector: UrbanLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: October 1992

Country : GHANA Project ID No: 3GHAPA125Project : Highway SectorAppraisal Date : June 10, 1994 IBRD Amount ($m):Board Date : February 28, 1995 IDA Amount ($m): 100.00Managing Division : AF4IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 1991

Country : GUINEA Project ID No: 3GUIPA052Project : Road Sector ManagementAppraisal Date : June 15, 1992 IBRD Amount (Sm): 0.00Board Date : May 03, 1994 IDA Amount (Sm): 30.00Managing Division : AFIIN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 15, 1990

Country : GUINEA Project ID No: 3GUIPA057Project : Urban Environment: Conakry SanitationAppraisal Date : March 04, 1994 IBRD Amount (Sm): 0.00Board Date : June 30, 1994 IDA Amount (Sm): 26.00Managing Division : AF1IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: September 1, 1992

I-138

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : COTE DIVOIRE Project ID No: 3IVCPA115Project : Road Maintenance & Rehabilitation

Appraisal Date : June 10, 1992 IBRD Amount ($m): 00.00Board Date : October 18, 1994 IDA Amount (Sm): 30.00Managing Division : AFlIN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: May 12, 1992

Country : KENYA Project ID No: 3KENPA102Project : Urban TransportAppraisal Date : June 07, 1993 IBRD Amount ($m): 0.00Board Date : May 24, 1994 IDA Amount ($m): 80.00Managing Division : AF2EI Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 20, 1992

Country : KENYA Project ID No: 3KENPA134Project : Railways IIIAppraisal Date : June 24, 1993 IBRD Amount (Sm): 0.00Board Date : May 26, 1994 IDA Amount (Sm): 50.00Managing Division : AF2EI Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Apr. 26, 1993

Country : LESOTHO Project ID No: 3LESPA028Project : Privatisation/RestructuringAppraisal Date : June 04, 1993 IBRD Amount (Sm): 00.00Board Date : March 29, 1994 IDA Amount ($m): 11.00Managing Division : AF6IE Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 2, 1993

Country : LESOTHO Project ID No: 3LESPA030Project : Infrastructure MaintenanceAppraisal Date : December 15, 1994 IBRD Amount ($m): 0.00Board Date : June 15, 1995 IDA Amount ($m): 23.00Managing Division : AF6IN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Nov. 1, 1991

I-139

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : MADAGASCAR Project ID No: 3MAGPAO56Project :Irrigation Rehabilitation IIAppraisal Date :March 15, 1993 IBRD Amount ($m): 0.00Board Date : April 19, 1994 IDA Amount ($m): 12.00Managing Division : AF3AE Sector: AgricultureLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: January 15, 1993

Country : MADAGASCAR Project ID No: 3MAGPA067Project :Energy IIAppraisal Date : June 18, 1993 IBRD Amount (Sm): 0.00Board Date : July OS, 1994 IDA Amount (Sm): 45.00Managing Division :AF3IE Sector: EnergyLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: November 26, 1991

Country MADAGASCAR Project ID No: 3MAGPA068Project : Transport Sector ReformAppraisal Date : June 28, 1993 IBRD Amount ($m): 0.00Board Date : March 01, 1994 IDA Amount ($m): 32.30Managing Division : AF3IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : MADAGASCAR Project ID No: 3MAGPA099Project : TelecommunicationsAppraisal Date : April 26, 1993 IBRD Amount ($m): 0.00Board Date : March 29, 1994 IDA Amount (Sm): 26.00Managing Division : AF3IE Sector: TelecommunicationsLending Instrument: Sector Investment and Maintenance Status: LendingDate BA Category Assigned: December 15, 1993

Country : MADAGASCAR Project ID No: 3MAGPA108Project : Agricultural Exports PromotionAppraisal Date : March 15, 1993 IBRD Amount (Sm): 0.00Board Date : March 22, 1994 IDA Amount ($m): 12.00Managing Division : AF3AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: February 24, 1993

I-140

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : MADAGASCAR Project ID No: 3MAGPA117Project : Urban Works PilotAppraisal Date : June 28, 1993 IBRD Amount ($m):Board Date : July 12, 1994 IDA Amount ($m): 20.00Managing Division : AF3IN Sector: UrbanLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: March 10, 1993

Country : MADAGASCAR Project ID No: 3MAGPA119Project : Agricultural Marketing InfrastructureAppraisal Date : March 16, 1993 IBRD Amount (Sm):Board Date : May 24, 1994 IDA Amount (Sm): 12.00Managing Division : AF3AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: January 29, 1993

Country : MALAWI Project ID No: 3MALPA081Project : National Water Development

Appraisal Date : May 30, 1994 IBRD Amount (Sm): 0.00Board Date : February 16, 1995 IDA Amount (Sm): 25.00Managing Division : AF6IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: April 1990

Country : MALI Project ID No: 3MLIPA048Project : Transport SectorAppraisal Date : May 07, 1993 IBRD Amount (Sm): 0.00Board Date : March 15, 1994 IDA Amount (Sm): 120.00Managing Division : AF5IN Sector: TransportationLending Instrument: Speclfic Investment Loan Status: LendingDate EA Category Assigned: November 27, 1991

Country : MOZAMBIQUE Project ID No: 3MOZPA021Project : Gas EngineeringAppraisal Date : December 01, 1993 IBRD Amount ($m): 0.00Board Date : June 16, 1994 IDA Amount ($m): 25.00

Managing Division : AF6IE Sector: EnergyLending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned:

1-141

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : MOZAMBIQUE Project ID No: 3MOZPA040Project : Agricultural SectorAppraisal Date : October 01, 1994 IBRD Amount ($m): 0.00Board Date : November 01, 1995 IDA Amount ($m): 60.00Managing Division : AF6AE Sector: Pop. Health & NutritionLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: August 31, 1993

Country : MOZAMBIQUE Project ID No: 3MOZPA045Project : Roads and Coastal Shipping IIAppraisal Date : June 28, 1993 IBRD Amount (Sm):Board Date : April 05, 1994 IDA Amount ($m): 155.00Managing Division : AF6IN Sector: TransportationLending Instrument: Technical Assistance Loan Status: StandbyDate EA Category Assigned: September 17, 1992

Country : MAURITIUS Project ID No: 3MTSPA050Project : Port Extension and Free Port DevelopmentAppraisal Date : October 01, 1994 IBRD Amount (Sm): 20.00Board Date : March 07, 1995 IDA Amount (Sm):Managing Division : AF3IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 7, 1993

Country : NIGER Project ID No: 3NIGPA044Project : Transport Sector IIAppraisal Date : November 25, 1990 IBRD Amount ($m): 0.00Board Date : June 28, 1994 IDA Amount (Sm): 30.00Managing Division : AFSIN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: November 27, 2991

Country : NIGER Project ID No: 3NIGPA061Project : Pilot Private IrrigationAppraisal Date : June 19, 1991 IBRD Amount ($m): 0.00Board Date : March 17, 1994 IDA Amount ($m): 10.20Managing Division : AFSAG Sector: AgricultureLending Instruments Specific Investment Loan Status: LendingDate EA Category Assigned:

I-142

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : NIGERIA Project ID No: 3NIRPA131Project : Multi State Water IIAppraisal Date : June 10, 1994 IBRD Amount ($m): 00.00Board Date : November 15, 1994 IDA Amount (Sm): 50.00Managing Division : AF4IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 1992

Country : NIGERIA Project ID No: 3NIRPA142Project : RailwaysAppraisal Date : March 30, 1993 IBRD Amount (Sm): 00.00Board Date : January 25, 1994 IDA Amount ($m): 89.00Managing Division : AF4IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: November 26, 1991

Country : NIGERIA Project ID No: 3NIRPA163Project : Lagos Urban TransportAppraisal Date : June 20, 1994 IBRD Amount (Sm): 35.00Board Date : March 09, 1995 IDA Amount (Sm): 35.00Managing Division : AP4IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 1991

Country : NIGERIA Project ID No: 3NIRPA171Project : Rural Markets and InfrastructureAppraisal Date : May 15, 1994 IBRD Amount ($m): 120.00Board Date : April 11, 1995 IDA Amount ($m): 73.00Managing Division : AF4AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 11, 1992

Country : SIERRA LEONE Project ID No: 3SILPA034Project : Transport RehabilitationAppraisal Date : September 29, 1994 IBRD Amount (Sm): 0.00Board Date : May 16, 1995 IDA Amount ($m): 20.00Managing Division : AF4IN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned:

I-143

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : SIERRA LEONE Project ID No: 3SILPA042Project : Urban Water SupplyAppraisal Date : February 01, 1994 IBRD Amount (Sm):Board Date : June 23, 1994 IDA Amount (Sm); 10.00Managing Division : AF4IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 1993

Country : SWAZILAND Project ID No: 3SWAPA022Project Urban Development IAppraisal Date : June 26, 1993 IBRD Amount (Sm): 20.00Board Date : May 31, 1994 IDA Amount (Sm): 0.00Managing Division : AF6IN Sector: UrbanLending Instrument: Specific Investment Loan Status; LendingDate EA Category Assigned:

Country : TANZANIA Project ID No: 3TANPA086Project : Urban/Infrastructure RehabilitationAppraisal Date : May 13, 1994 IBRD Amount ($m): 0.00Board Date : June 08, 1995 IDA Amount (Sm): 80.00Managing Division : AF2EI Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 17, 1992

Country : TANZANIA Project ID No: 3TANPAO98Project : Roads IIAppraisal Date : June 21, 1993 IBRD Amount ($m):Board Date : March 24, 1994 IDA Amount ($m): 1SO.00Managing Division : AF2EI Sector: TransportationLending Instrument: Specific Investment Loan Statuss LendingDate EA Category Assigned: Feb. 24, 1993

Country : TANZANIA Project ID No: 3TANPAI15Project : Private Sector DevelopmentAppraisal Date : February 24, 1994 IBRD Amount ($m): 0.00Board Date : July 14, 1994 IDA Amount (Sm): 25.00Managing Division : AF2PE Sector: Industrial/IDFLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 25, 1992

I-144

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :TANZANIA Project ID No: 3TANPA126Project :Agricutural ServicesAppraisal Date : March 30, 1994 IBRD Amount ($m): 0.00Board Date :May 25, 1995 IDA Amount (Sm): 30.00Managing Division :AF2AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : TANZANIA Project ID No: 3TANPA140Project : Mining Technical AssistanceAppraisal Date :December 29, 1993 IBRD Amount (Sm): 0.00Board Date : June 30, 1994 IDA Amount ($m): 18.00Managing Division : AF2PE Sector: Mining & other ExtractiveLending Instrument: Technical Assistance Loan Status: StandbyDate EA Category Assigned: Jun. 23, 1993

Country : TANZANIA Project ID No: 3TANPA148Project : Tourism DevelopmentAppraisal Date : February 01, 1995 IBRD Amount (Sm):Board Date : September 05, 1995 IDA Amount (Sm): 50.00Managing Division :AF2EI Sector: TourismLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: October 20, 1993

Country : TOGO Project ID No: 3TOGPA039Project : Lome Urban DevelopmentAppraisal Date : June 08, 1992 IBRD Amount ($m): 0.00Board Date : April 26, 1994 IDA Amount (Sm): 25.00Managing Division : AFlIN Sector: UrbanLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: May 15, 1990

Country :UGANDA Project ID No: 3UANPA030Project : Transport RehabilitationAppraisal Date :June 27, 1993 IBRD Amount (Sm): 0.00Board Date : February 08, 1994 IDA Amount (Sm): 60.00Managing Division : AF2EI Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

I-145

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :UGANDA Project ID No: 3UANPA064Project : Small Towns WaterAppraisal Date : April 26, 1993 IBRD Amount (Sm): 0.00Board Date : February 15, 1994 IDA Amount (Sm): 43.20Managing Division :AF2EI Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 23, 1992

Country : UGANDA Project ID No: 3UANPA084Project : Cotton Subsector

Appraisal Date : June 28, 1993 IBRD Amount ($m): 0.00Board Date : February 24, 1994 IDA Amount ($m): 13.50Managing Division : AF2AE Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 23, 1993

Country :ZAMBIA Project ID No: 3ZAMPA070Project : Agricultural Sector InvestmentAppraisal Date : June 14, 1994 IBRD Amount ($m): 0.00Board Date : March 29, 1995 IDA Amount (Sm): 40.00Managing Division :AF6AE Sector: AgricultureLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned:

Country : ZAMBIA Project ID No: 3ZAMPA104Project : Petroleum RehabilitationAppraisal Date : June 09, 1993 IBRD Amount (Sm):Board Date : April 07, 1994 IDA Amount ($m): 30.00Managing Division : AF6IE Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : ZIMBABWE Project ID No: 3ZIMPA049Project : Small & Micro-enterprise DevelopmentAppraisal Date : June 25, 1993 IBRD Amount ($m): 35.00Board Date : June 21, 1994 IDA Amount (Sm): 0.00Managing Division : AF6IB Sector: Industrial/IDFLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: August 18, 1992

I-146

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : ZIMBABWE Project ID No: 3ZIMPA066Project : TelecommunicationsAppraisal Date : August 21, 1992 IBRD Amount ($m): 50.00Board Date : August 09, 1994 IDA Amount ($m): 0.00Managing Division : AF6IE Sector: TelecommunicationsLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Aug. 31, 1992

1-147

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : CHINA Project ID No: 4CHAPA126Project : Shanghai Industrial Enterprise ReformAppraisal Date : June 30, 1994 IBRD Amount (Sm): 150.00Board Date : December 20, 1994 IDA Amount (Sm): 0.00Managing Division :EA2IE Sector: FinancialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 19, 1992

Country : CHINA Project ID No: 4CHAPA134Project : Loess PlateauAppraisal Date : October 20, 1993 IBRD Amount ($m):Board Date : May 03, 1994 IDA Amount ($m): 150.00Managing Division : EA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Dec. 3, 1992

Country : CHINA Project ID No: 4CHAPA151Project : Forest Resource Development and ProtectionAppraisal Date : November 15, 1993 IBRD Amount ($m): 30.00Board Date : June 07, 1994 IDA Amount ($m): 200.00Managing Division : EA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Aug. 25, 1992

Country : CHINA Project ID No: 4CHAPA179Project : Shenyang Engineering IndustryAppraisal Date : November 29, 1993 IBRD Amount (Sm): 150.00Board Date : June 14, 1994 IDA Amount (Sm): 0.00Managing Division : EA2IE Sector: Industrial/IDFLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned:

Country : CHINA Project ID No: 4CHAPA180Project : Shanghai EnvironmentAppraisal Date : June 28, 1993 IBRD Amount (Sm): 150.00Board Date : March 15, 1994 IDA Amount (Sm): 100.00Managing Division : EA2EU Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

I-148

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : CHINA Project ID No: 4CHAPA187

Project : Songliao PlainAppraisal Date : June 28, 1993 IBRD Amount ($m): 65.00Board Date :February 22, 1994 IDA Amount (Sm): 205.00

Managing Division : EA2AG Sector: Agriculture

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: Nov. 30, 1992 1

Country :CHINA Project ID No: 4CHAPA189

Project : Red Soils II Land RehabilitationAppraisal Date : June 28, 1993 IBRD Amount (Sm): 0.00

Board Date : February 01, 1994 IDA Amount (Sm): 150.00

Managing Division :EA2AG Sector: Agriculture

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned:

Country : CHINA Project ID No: 4CHAPA194

Project : Technology DevelopmentAppraisal Date : November 29, 1993 IBRD Amount (Sm): 190.00

Board Date : July 05, 1994 IDA Amount (Sm): 50.00

Managing Division : EA2IE Sector: Education

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned:

Country : CHINA Project ID No: 4CHAPA196

Project :Hubei Urban Environmental

Appraisal Date :January 10, 1995 IBRD Amount ($m): 125.00

Board Date : June 27, 1995 IDA Amount ($m): 25.00

Managing Division : EA2EU Sector: Urban

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned:

Country : CHINA Project ID No: 4CHAPA197

Project : Housing and Social Security Reform

Appraisal Date :October 25, 1993 IBRD Amount (Sm): 325.00

Board Date : May 17, 1994 IDA Amount (Sm): 75.00

Managing Division : EA2EU Sector: Public Sector Management

Lending Instrument: Financial Intermediary Loan Statues: Standby

Date EA Category Assigned: Feb. 6, 1992

I-149

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B"rPROJECTS

Country : CHINA Project ID No: 4CHAPA227Project : TelecommunicationsAppraisal Date : June 28, 1993 IBRD Amount ($m): 255.00Board Date s December 21, 1993 IDA Amount ($m):Managing Division s EA2IE Sector: Industrial/IDFLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : CHINA Project ID No: 4CHAPA233Project : Southwest Poverty ReductionAppraisal Date : November 12, 1994 IBRD Amount ($m):Board Date : June 20, 1995 IDA Amount (Sm): 200.00Managing Division : EA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: November 24, 1993

Country : INDONESIA Project ID No: 4INSPA246Project : Second Highway Sector InvestmentAppraisal Date : May 03, 1993 IBRD Amount ($m): 350.00Board Date : January 04, 1994 IDA Amount ($m): 0.00Managing Division ; EA3IN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: Sept. 4, 1992

Country : INDONESIA Project ID No: 4INSPA255Project : Java Irrigation and Water ManagementAppraisal Date : October 07, 1993 IBRD Amount (Sm): 180.00Board Date : May 24, 1994 IDA Amount (Sm):Managing Division : EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Apr. 15, 1992

Country : INDONESIA Project ID No: 4INSPA280Project : Rural Electrification IIAppraisal Date : December 20, 1993 IBRD Amount (Sm): 325.00Board Date : June 07, 1994 IDA Amount (Sm): 0.00Managing Division : EA3IE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Apr. 06, 1992

1-150

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :INDONESIA Project ID No: 4INSPA285Project :Land AdministrationAppraisal Date : November 19, 1993 IBRD Amount ($m): 64.00Board Date :July 05, 1994 IDA Amount (Sm): 0.00Managing Division :EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Apr. 8, 1992

Country : INDONESIA Project ID No: 4INSPA302Project : TelecommunicationsAppraisal Date : September 01, 1994 IBRD Amount (Sm): 400.00Board Date : January 17, 1995 IDA Amount ($m): 0.00Managing Division : EA3IE Sector: TelecommunicationsLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Jan. 26, 1993

Country : INDONESIA Project ID No: 4INSPA31iProject :Dam SafetyAppraisal Date : October 18, 1993 IBRD Amount ($m): 60.00Board Date : May 24, 1994 IDA Amount (Sm):Managing Division : EA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 10, 1993

Country : INDONESIA Project ID No: 4INSPA321Project : Fifth Kabupaten RoadsAppraisal Date : November 11, 1993 IBRD Amount (Sm): 100.00Board Date : March 15, 1994 IDA Amount (Sm):Managing Division :EA3IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. S, 1993

Country : LAO, P.D.R. Project ID No: 4LAOPA020Project : Forest Management and ConservationAppraisal Date : November 19, 1991 IBRD Amount ($m): 0.00Board Date : June 21, 1994 IDA Amount ($m): 8.70Managing Division : EAIAN Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Oct. 31, 1991

I-151

ENVIRONMENTAL DATA SHEET FOR CATEGORY "Bf PROJECTS

Country : LAO, P.D.R. Project ID No: 4LAOPA025Project : Second Highway ImprovementAppraisal Date : June 01, 1993 IBRD Amount ($m): 0.00Board Date : March 29, 1994 IDA Amount (Sm): 30.00Managing Division : EAIIN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : MALAYSIA Project ID No: 4MAYPA117Project : RISDA IIAppraisal Date : June 03, 1993 IBRD Amount ($m): 70.00Board Date : January 18, 1994 IDA Amount ($m):Managing Division : EAlAN Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: May 12, 1993

Country : MONGOLIA Project ID No: 4MNGPA004Project : Transport RehabilitationAppraisal Date : September 16, 1993 IBRD Amount (Sm):Board Date : April 05, 1994 IDA Amount ($m): 30.00Managing Division : EA2TP Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned:

Country s PHILIPPINES Project ID No: 4PHLPA153Project : Water Supply, Sewerage and Sanitation Sector IIAppraisal Date : September 01, 1994 IBRD Amount ($m): 40.00Board Date : April 18, 1995 IDA Amount ($m): 0.00Managing Division : EAlIN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned:

Country : PHILIPPINES Project ID No: 4PHLPA199Project : Distribution System EfficiencyAppraisal Date : February 15, 1994 IBRD Amount ($m): 10.00Board Date : July 15, 1994 IDA Amount ($m):Managing Division : EAlIE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: November 4, 1993

1-152

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :PHILIPPINES Project ID No: 4PHLPA204Project : Subic Bay FreeportAppraisal Date :November 26, 1993 IBRD Amount (Sm): 30.00Board Date :April 12, 1994 IDA Amount ($m):Managing Division : EAlIE Sector: Industrial/IDFLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 8,1993

Country : THAILAND Project ID No: 4THLPA152Project : Provincial Distribution Improvement and ExpansionAppraisal Date : May 29, 1993 IBRD Amount (Sm): 50.00Board Date : January 20, 1994 IDA Amount (Sm):Managing Division : EAlIE Sector: PowerLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned:

Country : VIET NAM Project ID No: 4VNMPA013Project : Agricultural Intensification & RehabilitationAppraisal Date : February 20, 1991 IBRD Amount ($m): 0.00Board Date : January 20, 1994 IDA Amount ($m): 147.10Managing Division : EAlAN Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA.Category Assigned: Jan. 29, 1993

I-153

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :ALGERIA Project ID No: SALGPA097Project :Irrigation Management SupportAppraisal Date :October 15, 1994 IBRD Amount (Sm): 50.00Board Date :August 22, 1995 IDA Amount (Sm): 0.00Managing Division :MN1AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country :ALGERIA Project ID No: 5ALGPA103Project : Water Supply & Sewerage Rehab.Appraisal Date : June 16, 1993 IBRD Amount (Sm): 150.00Board Date : January 27, 1994 IDA Amount (Sm):Managing Division :MN1IN Sector: Water Supply & SanitationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: June 1993

Country : ALGERIA Project ID No: SALGPA109Project : Agricultural ServicesAppraisal Date : September 30, 1994 IBRD Amount (Sm): 50.00Board Date : May 09, 1995 IDA Amount (Sm):Managing Division :MN1AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 21, 1993

Country : EGYPT- Project ID No: SEGTPA147Project :Helwan Pollution ControlAppraisal Date :November 01, 1992 IBRD Amount ($m): 50.00Board Date : March 08, 1994 IDA Amount ($m): 50.10Managing Division : MN2IE Sector: EnvironmentLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Jan. 1992

Country : EGYPT Project ID No: 5EGTPA176Project .Agricultural ModernizationAppraisal Date : June 08, 1993 IBRD Amount (Sm): 67.00Board Date : January 20, 1994 IDA Amount (Sm): 65.70Managing Division : MN2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: May 27, 1992

I-154

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : EGYPT Project ID No: 5EGTPA191Project : Core Environmental ProgramAppraisal Date : February 07, 1994 IBRD Amount ($m):Board Date : June 28, 1994 IDA Amount (Sm): 5.60Managing Division : MN2IN Sector: EnvironmentLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 21, 1993

Country : EGYPT Project ID No: SEGTPA192Project : Irrivation ImprovementAppraisal Date : June 27, 1994 IBRD Amount ($m): 50.00Board Date : December 20, 1994 IDA Amount (Sm): 28.40Managing Division : MN2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: November 1993

Country : IRAN Project ID No: SIRNPA043Project : Rangeland Development and LivestockAppraisal Date : June 28, 1993 IBRD Amount ($m): 125.00Board Date : March 22, 1994 IDA Amount ($m):Managing Division : MN1AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : IRAN Project ID No: 5IRNPA046Project : PortsAppraisal Date : January 06, 1995 IBRD Amount ($m): 200.00Board Date : July 15, 1995 IDA Amount (Sm):Managing Division : MNlIN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : JORDAN Project ID No: 5JORPA084Project : TelecommunicationsAppraisal Date : January 06, 1994 IBRD Amount (Sm): 20.00Board Date : May 24, 1994 IDA Amount (Sm):Managing Division : MN2IE Sector: TelecommunicationsLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

I-155

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country JORDAN Project ID No: 5JORPAO0SProject : Housing SectorAppraisal Date : July 11, 1994 I8RD Amount (Sm): 30.00Board Date ; January 12, 1995 IDA Amount (Sm):Managing Division : MN2IN Sector: UrbanLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned:

Country : LEBANON Project ID No: 5LEBPA021Project : Irrigation Rehabilitation and ModernizationAppraisal Date : February 10, 1994 IBRD Amount (Sm): 35.00Board Date : June 28, 1994 IDA Amount (Sm):Managing Division : MN2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: November 17, 1993

Country : MOROCCO Project ID No: 5MYCPA142Project : Highway VIAppraisal Date : June 30, 1993 IBRD Amount (Sm): 100.00Board Date : July 12, 1994 IDA Amount (Sm): 0.00Managing Division : MN1IN Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: October 1991

Country : MOROCCO Project ID No: SMYCPA146Project : Agricultural Sector Investment Loan IIAppraisal Date : April 11, 1993 IBRD Amount (Sm): 115.00Board Date : January 11, 1994 IDA Amount (Sm): 0.00Managing Division : MN1AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 29, 1993

Country : MOROCCO Project ID No: SMYCPA152Project : Irrigated Areas Agricultural ServicesAppraisal Date : February 01, 1993 IBRD Amount (Sm); 35.00Board Date : December 21, 1993 IDA Amount ($m): 0.00Managing Division : MN1AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 20, 1991

I-156

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : MOROCCO Project ID No: SMYCPA156Project : Sewerage and Pilot Water ReuseAppraisal Date : January 06, 1995 IBRD Amount ($m): 100.00Board Date : July 27, 1995 IDA Amount (Sm):Managing Division :MNlIN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : MOROCCO Project ID No: SMYCPA166Project : Rural Poverty and Environmental ProtectionAppraisal Date :August 01, 1994 IBRD Amount ($m): 30.00Board Date : January 17, 1995 IDA Amount ($m):Managing Division : MNIAG Sector: AgricultureLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: July 31, 1992

Country : TUNISIA Project ID No: 5TUNPA089Project :Water Supply VIIIAppraisal Date : November 20, 1993 IBRD Amount (Sm): 50.00Board Date : April 05, 1994 IDA Amount ($m):Managing Division :MNIIN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 6, 1993

Country :TUNISIA Project ID No: 5TUNPA130Project : National Rural FinanceAppraisal Date : March 20, 1994 IBRD Amount (Sm): 65.00Board Date : September 29, 1994 IDA Amount (Sm): 0.00Managing Division : MN1AG Sector: AgricultureLending Instrument: Financial Intermediary Loan Status: LendingDate EA Category Assigned: July 26, 1991

Country : TUNISIA Project ID No: 5TUNPA141Project :Urban Sewerage IVAppraisal Date : November 15, 1994 IBRD Amount (Sm): 80.00Board Date : July 15, 1995 IDA Amount (Sm):Managing Division : MN1IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: November 1993

1-157

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : TUNISIA Project ID No: 5TUNPA143Project : N.W. Mountainous Areas DevelopmentAppraisal Date : June 22, 1993 IBRD Amount ($m): 25.00Board Date : December 23, 1993 IDA Amount ($m): 0.00Managing Division : MN1AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 11, 1991

Country : TUNISIA Project ID No: 5TUNPA159Project : Rural RoadsAppraisal Date : September 15, 1994 IBRD Amount ($m): 120.00Board Date : February 21, 1995 IDA Amount ($m):Managing Division : MN1IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : YEMEN Project ID No: SYEMPA056Project : Taiz Water and SewerageAppraisal Date : May 30, 1994 IBRD Amount (Sm):Board Date : November 22, 1994 IDA Amount (Sm): 30.50Managing Division : MN2IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Aug. 31, 1993

I-158

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :ARGENTINA Project ID No: 6ARGPA143Project : Reduction of OzoneAppraisal Date : May 01, 1994 IBRD Amount (Sm): 10.00Board Date :September 01, 1994 IDA Amount ($m):Managing Division :LA4TF Sector: EnvironmentLending Instrument: Credit Facility Status: LendingDate EA Category Assigned: December 1, 1993

Country : BELIZE Project ID No: 6BEZPA011Project : Power DevelopmentAppraisal Date : January 24, 1994 IBRD Amount (Sm); 13.00Board Date : July 15, 1994 IDA Amount (Sm): 0.00Managing Division :LA3TF Sector: PowerLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: April 9, 1992

Country : BELIZE Project ID No: 6BEZPA013Project : Private Sector DevelopmentAppraisal Date : October 19, 1992 IBRD Amount (Sm): 8.80Board Date : January 25, 1994 IDA Amount ($m): 0.00Managing Division : LA3TF Sector: FinancialLending Instrument: Financial Intermediary Loan Status: StandbyDate EA Category Assigned: Dec. 6, 1991

Country : BOLIVIA Project ID No: 6BOLPA064Project : Capitalization Program AdjustmentAppraisal Date : November 29, 1993 IBRD Amount ($m): 0.00Board Date : July 15, 1994 IDA Amount ($m): 58.40Managing Division : LA3TF Sector: Industrial/IDFLending Instrument: Financial Intermediary Loan Status: LendingDate EA Category Assigned: Nov. 18, 1991

Country : BOLIVIA Project ID No: 6BOLPA084Project : Municipal DevelopmentAppraisal Date : April 28, 1993 IBRD Amount (Sm): 0.00Board Date : December 21, 1993 IDA Amount ($m): 38.90Managing Division : LA3IN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: September 3, 1992

I-159

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : BOLIVIA Project ID No: 6BOLPA091Project : Land AdministrationAppraisal Date : June 15, 1994 IBRD Amount ($m):Board Date : June 15, 1995 IDA Amount ($m): 19.50Managing Division : LA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: January 14, 1993

Country : BRAZIL Project ID No: 6BRAPA236Project : Irrigation Subsector IIAppraisal Date : September 15, 1994 IBRD Amount ($m): 200.00Board Date : October 15, 1995 IDA Amount ($m): 0.00Managing Division : LAlEA Sector: AgricultureLending Instrument: Sector Investment and Maintenance Statuss StandbyDate EA Category Assigned: Nov. 7, 1989

Country BRAZIL 'Project ID No: 6BRAPA261Project : Land Management III (SP)Appraisal Date : November 01, 1992 IBRD Amount ($m): 55.00Board Date : February 15, 1994 IDA Amount (Sm): 0.00Managing Division : LAlEA Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 21, 1993

Country : BRAZIL Project ID No: 6BRAPA299Project : Environmental Rehabilitation and Conservation (CVRD)Appraisal Date : March 17, 1992 IBRD Amount ($m): 50.00Board Date : January 13, 1994 IDA Amount (Sm): 0.00Managing Division : LAlEI Sector: FinancialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Nov. 7, 1991

Country : BRAZIL Project ID No: 6BRAPA309Project Espirito Santo Water and Coastal Pollution ManagementAppraisal Date : November 01, 1993 IBRD Amount (Sm): 160.00Board Date : July 05, 1994 IDA Amount ($m):Managing Division : LA1IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Apr. 12, 1993

I-160

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : BRAZIL Project ID No: 6BRAPA342Project : State Highway Management IIAppraisal Date : May 17, 1993 IBRD Amount (Sm): 220.00Board Date : February 22, 1994 IDA Amount (Sm):Managing Division : LAIIN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: May 13, 1993

Country : BRAZIL Project ID No: 6BRAPA346Project : Sao Paulo Integrated Urban TransportAppraisal Date : December 15, 1993 IBRD Amount (Sm): 385.00Board Date : June 28, 1994 IDA Amount ($m):Managing Division : LAIIN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: Aug. 23, 1993

Country : CHILE Project ID No: 6CHLPA083Project : Water Resource ManagementAppraisal Date : September 05, 1994 IBRD Amount ($m): 120.00Board Date : March 15, 1995 IDA Amount (Sm): 0.00Managing Division : LA4IE Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 19, 1993

Country : CHILE Project ID No: 6CHLPA085Project : Third Road SectorAppraisal Date : November 16, 1992 IBRD Amount (Sm): 200.00Board Date : May 31, 1994 IDA Amount (Sm):Managing Division : LA4IE Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 10, 1992

Country : CHILE Project ID No: 6CHLPAIOOProject : Secano Agricultural Development IAppraisal Date : May 15, 1994 IBRD Amount ($m): 60.00Board Date : December 15, 1994 IDA Amount (Sm):Managing Division : LA4AP Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Feb. 17, 1993

1-161

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :COLOMBIA Project ID No: 6CLMPA159Project :Departmental RoadsAppraisal Date :March 15, 1995 IBRD Amount ($m): 200.00Board Date : November 15, 1995 IDA Amount (Sm):Managing Division : LA3IN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: Dec. 11, 1992

Country : COLOMBIA Project ID No: 6CLMPA189Project : Natural Resource Management ProgramAppraisal Date : June 23, 1993 IBRD Amount (Sm): 38.90Board Date : December 23, 1993 IDA Amount ($m): 0.00Managing Division : LA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 18, 1992

Country : COLOMBIA Project ID No: 6CLMPA201Project : Agricultural TechnologyAppraisal Date : June 28, 1993 IBRD Amount (Sm): 36.00Board Date :May 26, 1994 IDA Amount ($m): 0.00Managing Division : LA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: June 8, 1993

Country : COSTA RICA Project ID No: 6COSPA057Project : Forestry & Natural Resources ConservationAppraisal Date : June 30, 1994 IBRD Amount ($m): 34.00Board Date : March 07, 1995 IDA Amount ($m): 0.00Managing Division : LA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Dec. 11, 1992

Country : DOMINICAN R. Project ID No: 6DOMPA035Project : Power II-Power Generation & Institutional RestructuringAppraisal Date : March 28, 1994 IBRD Amount ($m): 70.00Board Date : September 20, 1994 IDA Amount ($m): 0.00Managing Division : LA3TF Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Dec. 11, 1992

1-162

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : DOMINICAN R. Project ID No: 6DOMPA044Project : Irrigated Land & Wastershed ManagementAppraisal Date : May 23, 1993 IBRD Amount ($m): 26.00Board Date : December 21, 1993 IDA Amount ($m): 0.00Managing Division : LA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Apr. 23, 1993

Country : ECUADOR Project ID No: 6ECUPA075Project : Irrigation Subsector Technical AssistanceAppraisal Date : January 15, 1994 IBRD Amount ($m): 26.00Board Date : July 15, 1994 IDA Amount (Sm): 0.00Managing Division : LA4AP Sector: AgricultureLending Instrument: Technical Assistance Loan Status: LendingDate EA Category Assigned: June 21, 1993

Country : EL SALVADOR Project ID No: 6ESLPA037Project : Energy Sector Modernization (ESM)Appraisal Date : December 13, 1993 IBRD Amount ($m) : 40.00Board Date : August 16, 1994 IDA Amount (Sm):Managing Division : LA2IE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Dec. 11, 1992

Country : GUATEMALA Project ID No: 6GUAPA038Project : Agricultural SectorAppraisal Date : June 30, 1994 IBRD Amount ($m): 65.00Board Date : January 17, 1995 IDA Amount (Sm): 0.00Managing Division : LA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 12, 1992

Country : GUYANA Project ID No: 6GUYPA033Project : Water Sewerage Rehabilitation and Technical AssitanceAppraisal Date : May 31, 1993 IBRD Amount (Sm): 0.00Board Date : December 21, 1993 IDA Amount (Sm): 16.60Managing Division : LA3IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: September 18, 1992

1-163

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : HAITI Project ID No: 6HAIPA046Project : Agric. Prod. & Land DevelopmentAppraisal Date : April 15, 1995 IBRD Amount ($m): 0.00Board Date : December 15, 1995 IDA, Amount ($m): 29.S0Managing Division : LA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned:

Country : HAITI Project ID No: 6HAIPA049Project : Road MaintenanceAppraisal Date : June 02, 1991 IBRD Amount (Sm): 0.00Board Date : July 15, 1995 IDA Amount ($m): 37.40Managing Division : LA3IN Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: Novenber 23, 1991

Country : JAMAICA Project ID No: 6JAMPA069Project : Water Supply and SewerageAppraisal Date : January 09, 1994 IBRD Amount ($m): 12.00Board Date : June 28, 1994 IDA Amount (Sm): 0.00Managing Division : LA3IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 18, 1992

Country : JAMAICA Project ID No: 6JAMPA078Project : Transport SectorAppraisal Date : July 15, 1994 IBRD Amount (Sm): 40.00Board Date : March 15, 1995 IDA Amount ($m): 0.00Managing Division : LA3IN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Sept. 15, 1993

Country : JAMAICA Project ID No: 6JAMPA083Project : Private Enterprise Investment & Export DevelopmentAppraisal Date : June 28, 1993 IBRD Amount (Sm): 35.00Board Date : March 15, 1994 IDA Amount ($m):Managing Division : LA3TF Sector: Multi SectorLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: November 22, 1993

1-164

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : MEXICO Project ID No: 6MXCPA111Project : Rainfed Areas DevelopmentAppraisal Date : November 03, 1993 IBRD Amount (Sm): 125.00Board Date : March 15, 1994 IDA Amount (Sm): 0.00Managing Division : LA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Sept. 07, 1993

Country : MEXICO Project ID No: 6MXCPA149Project : Railway SectorAppraisal Date :May 24, 1993 IBRD Amount (Sm): 150.00Board Date : February 15, 1994 IDA Amount (Sm): 0.00Managing Division : LA2IE Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: Nov. 20, 1991

Country : MEXICO Project ID No: 6MXCPA168Project :Power Transmission and Distribution IIAppraisal Date : June 27, 1994 IBRD Amount ($m): 400.00Board Date : January 17, 1995 IDA Amount (Sm): 0.00Managing Division : LA2IE Sector: PowerLending Instrument: Sector Investment and Maintenance Status: StandbyDate EA Category Assigned: Oct. 15, 1991

Country : MEXICO Project ID No: 6MXCPA205Project : Natural Forestry Development and ConservationAppraisal Date : October 30, 1994 IBRD Amount (Sm): 200.00Board Date : May 30, 1995 IDA Amount ($m): 0.00Managing Division : LA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 15, 1993

Country : MEXICO Project ID No: 6MXCPA206Project : On-Farm and Minor Irrigation Networks ImprovementAppraisal Date : June 21, 1993 IBRD Amount ($m): 200.00Board Date : January 25, 1994 IDA Amount ($m): 0.00Managing Division : LA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Nov. 12, 1991

I-165

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : MEXICO Project ID No: 6MXCPA207Project : Decentralization and Regional Development IIAppraisal Date : January 31, 1994 IBRD Amount (Sm): 400.00Board Date : June 14, 1994 IDA Amount ($m):Managing Division : LA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Mar. 9, 1993

Country : MEXICO Project ID No: 6MXCPA212Project : Water and Sanitation IIAppraisal Date : October 13, 1993 IBRD Amount (Sm): 350.00Board Date : March 29, 1994 IDA Amount (Sm): 0.00Managing Division : LA2IE Sector: Water Supply & SanitationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: June 12, 1992

Country : PANAMA Project ID No: 6PANPAO55Project : Roads RehabilitationAppraisal Date : June 21, 1993 IBRD Amount (Sm): 60.00Board Date : December 21, 1993 IDA Amount (Sm): 0.00Managing Division : LA2IE Sector: TransportationLending Instrument: Specific Investment Loan Status: LEndingDate EA Category Assigned: Jun. 2, 1993

Country : PARAGUAY Project ID No: 6PARPA066Project : Eighth HighwayAppraisal Date : June 13, 1992 IBRD Amount (Sm): 65.00Board Date : December 21, 1993 IDA Amount ($m): 0.00Managing Division : LA4IE Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Jan. 30, 1990

Country : PARAGUAY Project ID No: 6PARPA070Project : Private Sector DevelopmentAppraisal Date : January 20, 1992 IBRD Amount (Sm): 50.00Board Date : Aqgust 15, 1994 IDA Amount (Sm): 0.00Managing Division : LA4TF Sector: FinancialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Feb. 14, 1990

1-166

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : PERU Project ID No: 6PERPA117Project : Transport RehabilitationAppraisal Date : June 16, 1993 IBRD Amount (Sm): 150.00Board Date : February 15, 1994 IDA Amount (Sm): 0.00Managing Division : LA1IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Feb. 1, 1993

Country : PERU Project ID No: 6PERPA123Project : Lima Water Privatization & RehabilitationAppraisal Date : February 04, 1994 IBRD Amount ($m): 150.00Board Date : July 15, 1994 IDA Amount ($Sm):Managing Division : LA1IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: November 22, 1993

Country : PERU Project ID No: 6PERPA124Project : Municipal Rehabilitation and ManagementAppraisal Date : September 15, 1994 IBRD Amount (Sm)s 150.00Board Date : July 15, 1995 IDA Amount ($m):Managing Division : LAlIN Sector: UrbanLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Dec. 11, 1992

Country : TRINIDAD & T Project ID No: 6TRIPA028Project : Environmental Protection & ForestryAppraisal Date : June 15, 1994 IBRD Amount (Sm): 35.00Board Date : June 15, 1995 IDA Amount (Sm): 0.00Managing Division : LA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Dec. 10, 1992

Country : TRINIDAD & T Project ID No: 6TRIPA029Project : Power Sector InvestmentAppraisal Date : January 09, 1995 IBRD Amount ($m): 10.00Board Date : July 18, 1995 IDA Amount (Sm):Managing Division : LA3TF Sector: PowerLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Dec. 11, 1992

1-167

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : TRINIDAD & T Project ID No: 6TRIPA031Project : Emergency Water RehabilitationAppraisal Date : April 11, 1994 IBRD Amount (Sm): 36.00Board Date : November 29, 1994 IDA Amount (Sm):Managing Division : LA3IN Sector: Water Supply & SanitationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: Dec. 9, 1992

Country : URUGUAY Project ID No: 6URUPA067Project : Private Sector DevelopmentAppraisal Date : May 03, 1993 IBRD Amount ($m): 35.00Board Date : February 01, 1994 IDA Amount (Sm):Managing Division : LA4TF Sector: FinancialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 2, 1993

Country :URUGUAY Project ID No: 6URUPA069Project :Power Transmission and DistributionAppraisal Date :May 30, 1994 IBRD Amount (Sm): 85.00Board Date : January 10, 1995 IDA Amount ($m):Managing Division : LA4IE Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 29, 1993

Country : VENEZUELA Project ID No: 6VENPA030Project : Power Sector Investment IAppraisal Date : June 01, 1994 IBRD Amount ($m): 190.00Board Date : February 15, 1995 IDA Amount (Sm): 0.00Managing Division : LAIEI Sector: PowerLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Sep. 17, 1991

Country : VENEZUELA Project ID No: 6VENPA036Project : Hospital ModernizationAppraisal Date : June 27, 1993 IBRD Amount ($m): 66.90Board Date : June 02, 1994 IDA Amount (Sm): 0.00Managing Division :LAIHR Sector: Pop. Health & NutritionLending Instrument: Sector Investment Sector Status: Standby

InvestmentDate EA Category Assigned: Apr. 3, 1992

I-168

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :VENEZUELA Project ID No: 6VENPA042

Project :Irrigation Subsector

Appraisal Date :November 15, 1994 IBRD Amount ($m): 125.00.Board Date :July 15, 1995 IDA Amount ($m): 0.00Managing Division : LAlEA Sector: Agriculture

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: December 10, 1993

Country :VENEZUELA Project ID No: 6VENPA045

Project : Monagas Water

Appraisal Date : June 15, 1994 IBRD Amount ($m): 30.00

Board Date :April 15, 1995 IDA Amount ($m): 0.00

Managing Division :LAIIN Sector: Water Supply & Sanitation

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: June 12, 1992

1-169

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : ALBANIA Project ID No: 7ALBPA008Project :Power Loss ReductionAppraisal Date :March 01, 1994 IBRD Amount ($m):Board Date :June 01, 1994 IDA Amount (Sm): 10.20Managing Division :EC2EE Sector: EnergyLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: March 23, 1993

Country :ALBANIA Project ID No: 7ALBPA009Project : Water/SewerageAppraisal Date : May 31, 1993 IBRD Amount ($m):Board Date :February 04, 1994 IDA Amount (Sm): 11.60Managing Division : EC2AW Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: March 2, 1993

Country : ALBANIA Project ID No: 7ALBPA016Project :Feeder RoadsAppraisal Date :September 21, 1994 IBRD Amount (Sm):Board Date :July 21, 1995 IDA Amount (Sm): 10.20Managing Division : EC2IN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Jun. 8, 1993

Country : ALBANIA Project ID No: 7ALBPA019Project : Irrigation RehabilitationAppraisal Date :November 22, 1993 IBRD Amount (Sm):Board Date : May 09, 1994 IDA Amount ($m): 5.00Managing Division : EC2AW Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Jul. 6, 1993

Country : ALBANIA Project ID No: 7ALBPA023Project :Urban WQorks and Microenterprise Development PilotAppraisal Date : March 01, 1994 IBRD Amount (Sm):Board Date : July 05, 1994 IDA Amount (Sm): 2.90Managing Division : EC2AW Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 20, 1993

I-170

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : ARMENIA Project ID No: 7ARMPA004Project : Irrigation RehabilitationAppraisal Date :October 08, 1993 IBRD Amount (Sm): 30.00Board Date :April 26, 1995 IDA Amount (Sm):Managing Division : EC4NR Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 2, 1993

Country : BULGARIA Project ID No: 7BULPAOO5Project : Agricultural DevelopmentAppraisal Date : November 01, 1993 IBRD Amount ($m): 50.00Board Date : May 24, 1994 IDA Amount ($m): 0.00Managing Division : ECIAG Sector: AgricultureLending Instrument: Line of Credit Status: LendingDate EA Category Assigned:

Country : BULGARIA Project ID No: 7BULPAO11Project : TransportAppraisal Date : April 11, 1994 IBRD Amount (Sm): 100.00Board Date :December 08, 1994 IDA Amount (Sm):Managing Division : EClIV Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Jun. 8, 1993

Country : BULGARIA Project ID No: 7BULPA015Project : Water Companies Restructuring & ModernizationAppraisal Date : June 21, 1993 IBRD Amount ($m): 98.00Board Date : January 20, 1994 IDA Amount ($m):Managing Division : EClIV Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Oct. 26, 1992

Country : BULGARIA Project ID No: 7BULPA017Project : Energy IIAppraisal Date : June 15, 1994 IBRD Amount (Sm): 100.00Board Date : December 15, 1994 IDA Amount ($m):Managing Division : EC1IE Sector: EnergyLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: June 14, 1993

1-171

ENVIRONMENTAL DATA SHEET FOR CATEGORY "Be PROJECTS

Country : CROATIA Project ID No: 7CROPA002Project : Emergency ReconstructionAppraisal Date : January 10, 1993 IBRD Amount ($m): 125.00Board Date : October 04, 1994 IDA Amount (Sm):Managing Division : EC2IN Sector: UrbanLending Instrument: Emergency Reconstruction Loan Status: LendingDate EA Category Assigned: January 1993

Country : ESTONIA Project ID No: 7ESTPA003Project : Finance and Enterprise Sector RestructuringAppraisal Date : June 01, 1994 IBRD Amount (Sm): 20.00Board Date : August 15, 1994 IDA Amount ($m):Managing Division : EC4PE Sector: Multi SectorLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Aug. 25, 1993

Country : ESTONIA Project ID No: 7ESTPA006Project : Highway MaintenanceAppraisal Date : January 15, 1994 IBRD Amount ($m): 12.00Board Date : July 19, 1994 IDA Amount ($m):Managing Division : EC4IN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 20, 1993

Country : HUNGARY Project ID No: 7HUNPA060Project : Budapest Urban TransportAppraisal Date : September 27, 1993 IBRD Amount ($m): 75.00Board Date : April 30, 1994 IDA Amount ($m):Managing Division : EC2IN Sector: TransportationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: September 27, 1993

Country : HUNGARY Project ID No: 7HUNPA063Project : Water SupplyAppraisal Date : July 01, 1994 IBRD Amount ($m): 60.00Board Date : July 15, 1995 IDA Amount ($m):Managing Division : EC2AW Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: September 27, 1993

1-172

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : KAZAKHSTAN Project ID No: 7KAZPA003Project : Petroleum Technical AssistanceAppraisal Date : August 15, 1993 IBRD Amount ($m)s 20.00Board Date : January 25, 1994 IDA Amount J$m):Managing Division : EC3IV Sector: EnergyLending Instrument: Specific Investment Loan Statues LendingDate EA Category Assigned: November 30, 1993

Country : KAZAKHSTAN Project ID NO: 7KAZPA012Project : IrrigationAppraisal Date ; April 28, 1995 IBRD Amount ($m): 80.00Board Date : November 21, 1995 IDA Amount ($m):Managing Division : EC3AI Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: November 30, 1993

Country : KAZAKHSTAN Project ID NO: 7KAZPA013Project : Urban TransportAppraisal Date : March 22, 1993 IBRD Amount (Sm): 40.00Board Date : February 03, 1994 IDA Amount (Sm):Managing Division : EC3IV Sector; TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 17, 1993

Country : KYRGYZ REPUB Project ID No: 7KYRPA007Project : TelecommunicationsAppraisal Date : March 08, 1994 IBRD Amount (Sm): 15.00Board Date : September 20, 1994 IDA Amount ($m):Managing Division : EC3IV Sector: TelecommunicationsLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: December 21, 1993

Country : KYRGYZ REPUB Project ID No: 7KYRPA008Project : EnergyAppraisal Date : October 25, 1994 IBRD Amount ($m): 5.00Board Date : July 18, 1995 IDA Amount ($m): 14.90Managing Division : EC3IV Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: September 27, 1993

1-173

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : KYRGYZ REPUB Project ID No: 7KYRPA013Project : Enterprise RestructuringAppraisal Date : January 20, 1994 IBRD Amount (Sm):Board Date :June 14, 1994 IDA Amount (Sm): 12.70Managing Division : EC3AI Sector: FinancialLending Instrument: Financial Intermediary Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : LATVIA Project ID No: 7LATPA005Project :Finance EnterpriseAppraisal Date : February 02, 1994 IBRD Amount ($m): 30.00Board Date : June 24, 1994 IDA Amount ($m):Managing Division : EC4PE Sector: Multi SectorLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Sep. 3, 1993

Country : LITHUANIA Project ID No: 7LTHPA003Project : Finance and Enterprise Sector RestructuringAppraisal Date : June 01, 1994 IBRD Amount ($m): 60.00Board Date : October 11, 1994 IDA Amount (Sm):Managing Division :EC4PE Sector: Enterprise/FinanceLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sep. 2, 1993

Country : MOLDOVA Project ID No: 7MOLPA002Project : Energy and EnvironmentAppraisal Date : February 21, 1994 IBRD Amount (Sm): 30.00Board Date : May 31, 1994 IDA Amount ($m):Managing Division : EC4IN Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : MOLDOVA Project ID No: 7MOLPAOO8Project : Financial and Enterprise DevelopmentAppraisal Date : October 01, 1994 IBRD Amount (Sm): 40.00Board Date : February 07, 1995 IDA Amount (Sm):Managing Division : EC4PE Sector: Enterprise/FinanceLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: November 24, 1993

I-174

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : POLAND Project ID No: 7POLPA032

Project : Environment IIAppraisal Date : December 01, 1994 IBRD Amount ($m): 70.00

Board Date : June 30, 1995 IDA Amount ($m): 0.00

Managing Division : EC2AW Sector: Energy

Lending Instrument: Specific Investment Loan Status: Standby

Date EA Category Assigned: March 3, 1993

Country : POLAND Project ID No: 7POLPA051

Project t Katowice Heat SupplyAppraisal Date : March 05, 1993 IBRD Amount (Sm): 45.00Board Date : June 09, 1994 IDA Amount (Sm):

Managing Division : EC2EE Sector: EnergyLending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: May 11, 1993

Country : POLAND Project ID No: 7POLPA052

Project : Power PrivatizationAppraisal Date : September 30, 1994 IBRD Amount (Sm): 150.00

Board Date : July 15, 1995 IDA Amount (Sm):

Managing Division : EC2EE Sector: Power

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: Sep. 27, 1993

Country : ROMANIA Project ID No: 7ROMPA084

Project : Industrial Development

Appraisal Date : October 09, 1992 IBRD Amount ($m): 175.00

Board Date : January 27, 1994 IDA Amount (Sm): 0.00

Managing Division : EClCO Sector: Financial

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: August 25, 1992

Country : ROMANIA Project ID No: 7ROMPA085

Project : Local Government Development

Appraisal Date : January 15, 1995 IBRD Amount ($m): 100.00

Board Date : September 05, 1995 IDA Amount ($m):

Managing Division : EC1IV Sector: Transportation

Lending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: Nov. 12, 1992

I-175

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : ROMANIA Project ID No: 7ROMPA087Project Petroleum Sector RehabilitationAppraisal Date : March 15, 1993 IBRD Amount ($m): 200.00Board Date : January 13, 1994 IDA Amount ($m): 0.00Managing Division : EClIE Sector: EnergyLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: June 1, 1992

Country : ROMANIA Project ID No: 7ROMPA09SProject : Agricultural Privatization and Export MarketingAppraisal Date : June 24, 1994 IBRD Amount J$m): 150.00Board Date : March 02, 1995 IDA Amount ($m):Managing Division : EClAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : ROMANIA Project ID No: 7ROMPA104Project : Power Sector RehabilitationAppraisal Date : January 15, 1994 IBRD Amount ($m): 200.00Board Date : May 07, 1995 IDA Amount (Sm):Managing Division : EC1IE Sector: Multi SectorLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: October 1993

Country : ROMANIA Project ID No: 7ROMPA109Project : National CadastreAppraisal Date : October 03, 1994 IBRD Amount ($m): 50.00Board Date : August 07, 1995 IDA Amount ($m):Managing Division : EClAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 4, 1993

Country : RUSSIA Project ID No: 7RUSPA002Project : Gas DistributionAppraisal Date : January 25, 1994 IBRD Amount (Sm): 210.00Board Date : June 02, 1994 IDA Amount (Sm):Managing Division : EC3IV Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 25, 1993

I-176

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : RUSSIA Project ID No: 7RUSPA005Project : Urban TransportAppraisal Date : February 21, 1994 IBRD Amount (Sm): 300.00Board Date : July 28, 1994 IDA Amount ($m):Managing Division :EC3IV Sector: Transportation.Lending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 20, 1993

Country :RUSSIA Project ID No: 7RUSPA007Project :Highway Rehabilitation & MaintenanceAppraisal Date : May 23, 1993 IBRD Amount (Sm): 300.00Board Date : February 17, 1994 IDA Amount ($m):Managing Division : EC3IV Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 14, 1992

Country : RUSSIA Project ID No: 7RUSPA010Project : Agricultural Reform Implementation Support (ARIS)Appraisal Date : October 15, 1993 IBRD Amount (Sm): 250.00Board Date : May 17, 1994 IDA Amount ($m):Managing Division : Ec3AI Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: August 1993

Country : RUSSIA Project ID No: 7RUSPA018Project . Regional Agricultural Area DevelopmentAppraisal Date : July 01, 1994 IBRD Amount ($m): 300.00Board Date : March 14, 1995 IDA Amount ($m):Managing Division : EC3AI Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 8, 1992

Country : RUSSIA Project ID No: 7RUSPA020Project : Environment Technical AssistanceAppraisal Date : January 24, 1994 IBRD Amount (Sm): 100.00Board Date : May 31, 1994 IDA Amount ($m):Managing Division : EC3IV Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: September 27, 1993

I-177

ENVIRONMENTAL DATA SHEET FOR CATEGORY 'B" PROJECTS

Country : RUSSIA Project ID No: 7RUSPA038Project : Enterprise RestructuringAppraisal Date : November 23, 1993 IBRD Amount (Sm): 200.00Board Date : March 22, 1994 IDA Amount (Sm):Managing Division : EC3AI Sector: IndustrialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: D.ecember 21, 1993

Country : SLOVENIA Project ID No: 7SLOPA003Project : Investment RecoveryAppraisal Date : December 07, 1993 IBRD Amount ($m): 50.00Board Date : April 19, 1994 IDA Amount ($m):Managing Division : EC2CO Sector: FinancialLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 21, 1993

Country : TAJIKISTAN Project ID No: 7TAJPAOO5Project : ReconstructionAppraisal Date : February 21, 1994 IBRD Amount ($m):Board Date : July 19, 1994 IDA Amount (Sm): 19.70Managing Division : EC3IV Sector: Agriculture, Transportation, Oiland GasLending Instrument: Emergency Reconstruction Loan Status: LendingDate EA Category Assigned: September 27, 1993

Country : TURKEY Project ID No: 7TURPA222Project : Antalya Water Supply and SanitationAppraisal Date : June 28, 1994 IBRD Amount ($m): 100.00Board Date : January 05, 1995 IDA Amount (Sm):Managing Division : EC1IV Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 1991

Country : TURKEY Project ID No: 7TURPA227Project : Istanbul Water Supply and Sewage IIIAppraisal Date : June 30, 1994 IBRD Amount ($m): 250.00Board Date : January 05, 1995 IDA Amount ($m):Managing Division : EC1IV Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Jun. 1, 1993

1-178

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :UKRAINE Project ID No: 7UKRPA004Project : EnergyAppraisal Date :July 01, 1994 IBRD Amount (Sm): 200.00Board Date : July 01, 1995 IDA Amount ($m):Managing Division : EC4IN Sector: EnergyLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: September 20, 1993

Country :UKRAINE Project ID No: 7UKRPA010Project : Gas TransitAppraisal Date : February 01, 1994 IBRD Amount ($m): 170.00Board Date :July 28, 1994 IDA Amount ($m):Managing Division :EC4IN Sector: EnergyLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Sept. 20, 1993

I-179

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : BANGLADESH Project ID No: 8BANPA132Project :Second Road Rehabilitation & MaintenanceAppraisal Date :March 01, 1993 IBRD Amount (Sm): 0.00Board Date :March 29, 1994 IDA Amount ($m): 141.10Managing Division :SAlEI Sector: TransportationLending Instrument: Sector Investment and Maintenance Status: LendingDate EA Category Assigned: Sept. 8, 1992

Country : BANGLADESH Project ID No: 8BANPA149Project : Fourth Dhaka Water SupplyAppraisal Date :July 09, 1994 IBRD Amount (Sm): 0.00Board Date :July 03, 1995 IDA Amount (Sm): 50.00Managing Division :SAlEI Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: N/A

Country : BANGLADESH Project ID No: 8BANPA192Project : Power Sector Development IAppraisal Date : December 01, 1989 IBRD Amount ($m): 0.00Board Date : July 01, 1995 IDA Amount (Sm): 75.90Managing Division : SAlEI Sector: PowerLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Dec. 1989

Country : BANGLADESH Project ID No: 8BANPA212Project : River Bank Protection -Appraisal Date :June 27, 1992 IBRD Amount ($m): 0.00Board Date :March 21, 1994 IDA Amount (Sm): 106.00Managing Division : SAIAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: May 31, 1990

Country : BANGLADESH Project ID No: 8BANPA216Project :Coastal Embankment RehabilitationAppraisal Date : June 29, 1992 IBRD Amount ($m): 0.00Board Date : May 31, 1994 IDA Amount ($m): 46.00Managing Division : SAlAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

I-180

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : INDIA Project ID No: 8INDPA285Project :Transport & Trade Logistics .Appraisal Date : January 10, 1994 IBRD Amount ($m): 85.00Board Date : May 10, 1994 IDA Amount ($m): 0.00Managing Division :SA2IN Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: December 14, 1992

Country : INDIA Project ID No: 8INDPA447Project : Industrial Pollution PreventionAppraisal Date : January 07, 1994 IBRD Amount ($m): 200.00Board Date : May 24, 1994 IDA Amount ($m): 30.00Managing Division : SA2CI Sector: Industrial/IDFLending Instrument: Specific Investment Loan Status: LendlngDate EA Category Assigned: Feb. 12, 1993

Country : INDIA Project ID No: 8INDPA451Project : Uttar Pradesh Rural Water Supply & Environmental SanitationAppraisal Date : July 08, 1994 IBRD Amount ($m): 00.00Board Date : December 06, 1994 IDA Amount (Sm): 100.00Managing Division : SA2IN Sector: Water Supply & SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : INDIA Project ID No: 8INDPA4S2Project : Andhra Pradesh ForestryAppraisal Date : April 01, 1993 IBRD Amount (Sm): 0.00Board Date : January 18, 1994 IDA Amount (Sm): 77.30Managing Division :SA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: April 1992

Country : INDIA Project ID No: 8INDPA466Project : Madhya Pradesh ForestryAppraisal Date : September 01, 1994 IBRD Amount ($m):Board Date :April 04, 1995 IDA Amount ($m): 100.00Managing Division : SA2AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: StandbyDate EA Category Assigned: Feb. 10, 1993

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :NEPAL Project ID No: 8NEPPA065Project :Forestry IV (Second Terai)Appraisal Date : May 27, 1994 IBRD Amount ($m): 0.00Board Date : March 23, 1995 IDA Amount (Sm): 25.00Managing Division : SAlAG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : NEPAL Project ID No: 8NEPPA093Project : Road MaintenanceAppraisal Date : May 15, 1993 IBRD Amount (Sm):Board Date : February 08, 1994 IDA Amount (Sm): 60.00Managing Division : SAlEI Sector: TransportationLending Instrument: Specific Investment Loan Statust: LendingDate EA Category Assigned:

Country : NEPAL Project ID No: 8NEPPA095Project : Rural Water Supply & SanitationAppraisal Date : September 07, 1994 IBRD Amount (Sm):Board Date : September 07, 1995 IDA Amount ($m): 25.00Managing Division : SAlEI Sector: Water Supply.& SanitationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 1993

Country :NEPAL Project ID No: 8NEPPA099Project : Multimodal Transit and Trade FacilitationAppraisal Date : July 18, 1994 IBRD Amount (Sm):Board Date : July 11, 1995 IDA Amount ($m): 10.80Managing Division : SAlEI Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: Oct. 1992

Country : PAKISTAN Project ID No: 8PAKPA216Project : National Drainage Program IAppraisal Date : September 30, 1994 IBRD Amount ($m): 150.00Board Date ; May 16, 1995 IDA Amount ($m): 150.00Managing Division : SA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: April 1993

I-182

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country :PAKISTAN Project ID No: 8PAKPA233Project : Power Sector Development (WAPDA X)Appraisal Date :June 15, 1992 IBRD Amount ($m): 230.00Board Date :January 25, 1994 IDA Amount (Sm): 0.00Managing Division : SA3EI Sector: PowerLending Instrument: Specific Investment Loan Status: Lending

Date EA Category Assigned: Feb. 28, 1991

Country : PAKISTAN Project ID No: 8PARPA256Project : Punjab Forest Sector DevelopmentAppraisal Date : February 15, 1994 IBRD Amount ($m): 20.00Board Date : October 11, 1994 IDA Amount (Sm): 32.00Managing Division : SA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: June 3, 1992

Country : PAKISTAN Project ID No: 8PAXPA265Project : Financial Sector Deepening and IntermediationAppraisal Date :October 23, 1993 IBRD Amount (Sm): 110.00Board Date : June 16, 1994 IDA Amount (Sm): 10.00Managing Division : SA3CI Sector: Industrial Development/FinanceLending Instrument: Financial Intermediary Loan Status: StandbyDate EA Category Assigned: December 8, 1993

Country : PAKISTAN Project ID No: 8PAKPA274

Project : Balochistan Natural Resource ManagementAppraisal Date : April 01, 1993 IBRD Amount (Sm):Board Date : February 01, 1994 IDA Amount ($m): 16.10Managing Division : SA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: July 14, 1993

Country : PAKISTAN Project ID No: 8PAKPA276Project : Balochistan Minor Irrigation and Agricultural DevelopmentAppraisal Date : February 10, 1994 IBRD Amount (Sm):Board Date : December 01, 1994 IDA Amount ($m): 34.00Managing Division : SA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: October 21, 1993

I-183

ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS

Country : SRI LANKA Project ID No: 8SRIPA118Project : National Road TransportAppraisal Date : June 27, 1994 IBRD Amount ($m):Board Date : February 14, 1995 IDA Amount ($m): 45.00Managing Division : SA3EI Sector: TransportationLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned:

Country : SRI LANKA Project ID No: SSRIPA123Project :Mahaweli RestructuringAppraisal Date : January 31, 1994 IBRD Amount ($m):Board Date :June 28, 1994 IDA Amount ($m): 17.00Managing Division: SA3AG Sector: AgricultureLending Instrument: Specific Investment Loan Status: LendingDate EA Category Assigned: October 6, 1993

I-184

LISTING OF CATEGORY "C" PROJECTS

Africa BENIN 3BENPA038 Food Security

3BENPA042 Education Development3BENPA043 Private Sector Development

BURUNDI 3BUIPA050 Higher Education3BUIPA052 Health Sector Reform

BURKINA FASO 3BURPA048 Health/NutritionCAPE VERDE 3CAPPA006 Human Resources Developmert

3CAPPA017 Public Sector Reform and CapacityBuilding

C.A.R. 3CARPA033 Education IVCHAD 3CHDPA020 Agricultural Services

3CHDPA028 Population & Health3CHDPA040 Environmental Management

DJIBOUTI 3DJIPAOll HealthEQ. GUINEA 3EQGPA020 Technical AssistanceGABON 3GABPA018 Agriculture ServicesGAMBIA 3GAMPA029 Population/Health

3GAMPA035 Environmental Mgmt. Capacity Bldg.TA

GHANA 3GHAPA116 Educational/Vocational Training3GHAPA128 Private Sector II

GUINEA 3GUIPAO50 PAGEN III3GUIPA053 Health Nutrition Sector3GUIPA061 Financial Sector3GUIPA070 Equity and School Improvement

SectorCOTE DIVOIRE 3IVCPA093 Human Resources II

3IVCPA100 National Agricultural Services3IVCPA117 Rural Savings and Loans

KENYA 3KENPA118 STD/AIDS3KENPA138 Informal Sector3KENPA139 National Agricultural Research -

Phase II (NARP II)LESOTHO 3LESPA034 Public Sector Financial ManagementMADAGASCAR 3MAGPA093 Higher EducationMALAWI 3MALPA071 Institutional DevelopmentMOZAMBIQUE 3MOZPA033 Health II

3MOZPA052 Finance Sector Capacity BuilidingMAURITANIA 3MTAPA045 Education Sector/Restructuring II

3MTAPA052 Agricultural ServicesMAURITIUS 3MTSPA042 Technical Assistance to Enhance

Competitiveness3MTSPA047 Higher and Technical Education

NIGER 3NIGPA034 Natural Resource ManagementNIGERIA 3NIRPAl34 Health Systems Fund II

3NIRPA153 Secondary Education3NIRPA162 Nutrition

3NIRPAl66 National STD PreventionRWANDA 3RWAPA068 Education Sector II

3RWAPA075 Pharmaceutical Sector

I-185

LISTING OF CATEGORY "C" PROJECTS

Africa SENEGAL 3SENPA094 Private Sector CompetitivenessSupport Services

3SENPA097 Agricultural Services II3SENPA105 Technical and Vocational Training

Restructuring

SIERRA LEONE 3SILPA036 Health Sector3SILPAOSO Judicial and Legal Reform

TANZANIA 3TANPA117 Human Resources DevelopmentUGANDA 3UANPA070 AIDS

3UANPA083 Institutional Development

ZIMBABWE 3ZIMPA057 Agricultural Services

East Asia and CHINA 4CHAPA228 Maternal and Child HealthPacific

FIJI 4FIJPA022 Education

INDONESIA 4INSPA253 Skills Development4INSPA266 Health IV

4INSPA269 Book and Reading Development

4INSPA304 Secondary School TeacherDevelopment

4INSPA318 Graduate Education and Research4INSPA320 Accountancy Development II

LAO, P.D.R. 4LAOPA024 Health System Reform & MalariaControl

PHILIPPINES 4PHLPA161 Women's Health & Safe MotherhoodVIET NAM 4VNMPA004,Population and Family Health

4VNMPA014 Basic Health Services4VNMPA017 Population and Family Health

Middle East and ALGERIA 5ALGPA079 Health and Family Planning

North AfricaIRAN 5IRNPA040 Basic Education

5IRNPA053 Private Higher EducationDevelopment

LEBANON 5LEBPAO18 EducationMOROCCO 5MYCPA154 Social Priorities I

5MYCPA175 Private Sector Development5MYCPA178 Health Management

Latin America and ARGENTINA 6ARGPA068 Capital Markets Development

Caribbean

6ARGPA072 Decentralized Secondary Education

6ARGPA142 Capital Market Development

Technical AssistanceBOLIVIA 6BOLPA069 Hydrocarbon

Deregulation/Restructuring &Engineering

6BOLPA072 Education Reform

I-186

LISTING OF CATEGORY "C" PROJECTS

Latin America and BOLIVIA 6BOLPA099 Regulatory and Judicial Reform

Caribbean6BOLPA100 Rural Water and Sanitation6BOLPA101 Civil Service Reform

BRAZIL 6BRAPA314 Land Management IV {MS)

6BRAPA330 Minas Gerais Basic Education

Quality Improvement6BRAPA332 Higher Education Reform

6BRAPA344 Espirito Santo: Basic Education

6BRAPA345 Parana Basic Education

CHILE 6CHLPA097 Secondary Education Improvement

COLOMBIA 6CLMPA205 Financial Sector & Capital Market

Development6CLMPA206 Technology Policy and Development

CARIBBEAN RE 6CRBPA010 CDB VI6CRBPA012 OECS Regional Education

DOMINICAN R. 6DOMPA051 Private Sector Development

ECUADOR 6ECUPA076 Social Development III

6ECUPA103 Public Enterprise Reform6ECUPA106 Agriculture Census and Information

Systems6ECUPA107 Technical Assistance for

Modernization of the State Program

EL SALVADOR 6ESLPA033 Social Sector II

GUATEMALA 6GUAPA045 Basic Education III

GUYANA 6GUYPA035 Private Sector Development

HONDURAS 6HDSPA046 Health Sector

6HDSPA068 Basic Education

JAMAICA 6JAMPA087 Tax Administration Reform

6JAMPA088 Public Sector Reform

MEXICO 6MXCPA230 Primary Education II

6MXCPA239 State and Municipal ManagementNICARAGUA 6NICPA045 Health

6NICPA050 EducationPANAMA 6PANPA057 Rural Health

PARAGUAY 6PARPA076 Secondary Education Improvement

URUGUAY 6URUPA053 Health I

6URUPA063 Basic Education Quality Improvement

VENEZUELA 6VENPA043 Agricultural Extension

6VENPA072 Public Administration Reform and

Decentralization

Europe and Central ALBANIA 7ALBPA002 Health Rehabilitation

Asia

7ALBPA021 Tax Administration ModernizationBULGARIA 7BULPAO00 Education

7BULPA014 Bulgaria Health Development

7BULPA019 Employment and Cash Benefits

KAZAKHSTAN 7KAZPA010 Financial and Enterprise

Development

I-187

LISTING OF CATEGORY "C" PROJECTS

Europe and Central POLAND 7POLPA029 Telecommunications IIAsia

7POLPA038 Education RestructuringROMANIA 7ROMPA086 Employment & Social Protection

7ROMPA094 Education7ROMPA098 Telecommunication

RUSSIA 7RUSPA027 Financial Institutional Development7RUSPA036 Export Development and Finance Loan7RUSPA037 Second Rehabilitation Loan

TURKEY 7TURPA167 Informatics7TURPA183 Health III7TURPA20S Health II7TURPA208 Basic Education7TURPA231 Privatization Implementation

AssistanceUKRAINE 7UKRPA014 Ukraine Health

South Asia BANGLADESH 8BANPA151 Agricultural Research Management{Agric. Research III)

8BANPA163 Nutrition8BANPA217 Education Sector8BANPA220 Jute Sector Adjustment8BANPA227 Non-Formal Education8BANPA234 Intersectoral Population

INDIA 8INDPA415 Poverty Alleviation I18INDPA429 Agricultural Human Resources

Development8INDPA433 Tuberculosis Control8INDPA434 Andhra Pradesh Health Systems8INDPA456 Blindness Control8INDPA463 Family Welfare (Assam, Rajasthan

and Karnataka)8INDPA472 Forestry Research Education &

Extension8INDPA480 National Hydrology

NEPAL 8NEPPA082 Population/HealthPAKISTAN. 8PAKPA236 Secondary Sector Reform

8PAKPA253 Nutrition8PAKPA2S4 NWFP Primary Education8PAKPA270 Social Action Program8PAKPA272 Population II

SRI LANKA 8SRIPA072 General Education II8SRIPA113 Vocational and Technical Education

and Training

I-188

LISTING OF CATEGORY "'T" PROJECTS

Africa ANGOLA 3ANGPAO20 Urban Environment and Sanitation

3ANGPA035 Social ActionBENIN 3BENPA0S7 Population and Health IIBURUNDI 3BUIPA057 Communal Infrastructure

3BUIPA071 Telecommunications IIIBURKINA FASO 3BURPA044 Mining II

3BURPAO63 Private Irrigation3BURPA069 Population

COMOROS 3COMPAO22 Education IIIDJIBOUTI 3DJIPA013 Transport RehabilitationERITREA 3ERIPA003 PowerETHIOPIA 3ETHPAOSO Energy/Mining

3ETHPA100 Health & Nutrition3ETHPA106 Rural Roads

GHANA 3GHAPA117 Nutrition3GHAPA130 Fisheries

GUINEA BIS. 3GUBPA037 Bissau Water and SanitationGUINEA 3GUIPA064 Agricultural Services II

3GUIPA068 Mining/MineralKENYA 3KENPA114 Highway Sector III

3KENPA116 Arid Lands

3KENPA160 NutritionLESOTHO 3LESPA029 Agricultrual DiversificationMALAWI 3MALPA078 Environmental Support Program

3MALPA079 Agricultural Diversification3MALPA084 Education Sector III3MALPAO88 Private Sector Development

MALI 3MLIPA068 Urban III

3MLIPA073 Agro-processing PromotionMOZAMBIQUE 3MOZPA023 Environmental SupportMAURITANIA 3MTAPA054 Private Sector Development SECALNIGERIA 3NIRPA139 Livestock III

3NIRPA161 State Roads

3NIRPA178 National Agricultural TechnologySupport II

SEYCHELLES 3SEYPA008 Mahe Integrated Water SupplySIERRA LEONE 3SILPA039 Education IVSOUTH AFRICA 3SOUPAOO Basic Services (Education)

3SOUPA004 Rural Restructuring3SOUPA006 Private Sector Development3SOUPA007 Industrial Reform3SOUPAOO8 Basic Services (Urban)

TOGO 3TOGPA060 Environmental Action ProgramUGANDA 3UANPA078 District Health

3UANPAOSS Environmental ManagementZAMBIA 3ZAMPA091 Health and Nutrition Sector

3ZAMPA092 Mining and Financial Adjustment

(IFSAC)3ZAMPA109 Population

ZIMBABWE 3ZIMPA064 Energy Efficiency (Energy I)

I-189

LISTING OF CATEGORY "T" PROJECTS

East Asia and CHINA 4CHAPA04 INLAND WATERWAYS

Pacific4CHAPA185 State Farms Commercialization

4CHAPA230 Basic Education in Poor and

Minority Areas4CHAPA241 Economic Law Reform

INDONESIA 4INSPA279 Industrial Technology Development4INSPA314 Ports Upgrading

MALDIVES 4MLDPA007 Education

MONGOLIA 4MNGPAOO5 Crop ProductionPHILIPPINES 4PHLPA160 Agriculture Education

4PHLPA188 Rural Infrastructure

4PHLPA206 Manila Sewerage II

VANUATU 4VANPA012 Education II

Middle East and ALGERIA 5ALGPA089 Toxic Waste Management

North Africa5ALGPA102 Housing

IRAN 5IRNPA056 Sistan Irrigation and Drainage

JORDAN 5JORPA069 Human Resources II

SJORPA072 Agricultural Sector Adjustment

(ASAL)LEBANON 5LEBPA017 Technical Assistance for

Administrative Rehabilitation

TUNISIA 5TUNPA146 Resource Management

5TUNPA153 Secondary Education Support

Latin America and ARGENTINA 6ARGPA11O Provincial Health Development

Caribbean6ARGPA120 Forestry Management

6ARGPAl32 Flood Protection

ECUADOR 6ECUPAl02 Agricultural Services

HONDURAS 6HDSPA037 Water and Sanitation II

6HDSPA065 Environmental InstitutionalDevelopment

MEXICO 6MXCPA194 Basic Health II

6MXCPA231 Aquaculture

PARAGUAY 6PARPA072 Regional Agricultural Development

IiPERU 6PERPA109 Irrigation Rehabilitation

VENEZUELA 6VENPA058 Land Management

Europe and Central ALBANIA 7ALBPA018 Education

Asia

BULGARIA 7BULPA007 Agricultural Development II

GEORGIA 7GEOPA006 Agriculture Rehabilitation

LATVIA 7LATPA004 Social Protection

POLAND 7POLPA044 Employment/Training II

I-190

LISTING OF CATEGORY 'T" PROJECTS

Europe and Central POLAND 7POLPA045 Cash Benefit and Health InsuranceAsia

ROMANIA 7ROMPA096 Oil and Gas Development

South Asia INDIA 8INDPA450 Primary Education II

8INDPA453 ADP - Assam

GLOBAL ENvIRONMENT FACILiTY - QUARTERLY REPORT ON INVESTMENT PROJECTS

The Global Envunmet Trust Fund (GEM) nd th famewowk of the Global Envionnt Facility (GEF)wa establised in tho Bank an March 14, 1991 to usist developing coutre by way of gants d conceujoafinaing in.carrying out programs to protct the global environment Mm GEP is a three-year plo prgramdedgned to denowt coat-effective, ovative thnologies or approaches to mitiga elected globenviron al problems It has four objective. for theoperstions of the Facility: a) reducing and limiting msof greenhouse gases which cause global warning, b) preservng teo earth's biological divasity and maintaininnatural habitats; c) arresting the pollution of intenational waters; and d) protcing the ozone layer from furerdepletion. However, projects to reduce emissions of ozone depleting subanes will largely be fined from theBank's Ozne Layer Protection Trust Fund which reeives fund from the Interim Mulilateral Fund undr theMonreal ProtocoL

GE1P i a coopeative venture among national governments, the World Bank (for investm t projec), thUnited Nations Development PrograNmme-UNDP (for pre-investment studies and technical assistance), and to UnitedNatidonal Envi l Program-UNEP (for scientific and technical advice). Further, the Bank has been aske toadminister the program funded by GET, and in its capacity as Trustee, the Bank is also authorized to en intoCofinancing Arrangements with potential cofinancies.

This quartedy Annex HI provides information on investment projects that have been reviewed by the GEFParticipants (Donors) and have been approved for further processug by the Bank, as well as investment projctsthat ar in the project pipeline to be presented for review at subsequent GEF Participants' meetings.

GL40wAL xvMMNo aNT FALITY ANNEX 11-1QUARTERLY REPORT ON _VESTMENT PRODIE-

(As (December 1 1993)

.Amoumt 0am) GET proj GETI Probal (lweastdi Objwte & Coesading Stage of Prooscag * antender Assocated nkProled) ProlectDewrlpt &rvka Action onProcuresfent

AI CA . 1

CAMlROON 5.0 Troplal Foret Blodwist Coaaukasalrsady WorkProram"risky of (GME) (ro be dcnd) Devlopmn of land ue pla for eced Apais m a is foe

ErAmomt Xpriority ucs;e aianf,-Iam Sold.andFoty uncys; nd davelopment and Implmaedt

of mangmmi pls ofremes.

CENTRAL AFAA LS Acagbtm -d DIdbuda of Blodvasty To be datnsned Wok Progm(GET) ComprbemalmA Lasadgat TM Acquiim ofLmdtaT2I data aets for Appran ac d

eUhe Immry manstormImngl buae &epe an for Ja y 1994(Fe mmdngpoet) evaatng eff%ivemm oft oemmomentat

dgemmdaezvadoacffmte

in ca

COTE DIVOIRE 5Lo Crop Wadte Po Project Global Warming To be detmined WorkProgam(GO) (1l3MaEerDcopmmr) Power gemeion fom paim il and Agprla scheduled for25.0 ohercrop peoAg residuck Fcebusty IS94.

ank) vt sector po-wr ptodc

KINYA 62 Tens RIverPrma ladverq To be detesuond WorkProgramfih ef WUf (GET) (Fees e proj) Esablising effecdve manuaene Prepaao 'dviwy wha Tod ofthe Raeve an rduwsg PPA of SDR 400,000

reance by locl c omity on ap4vd Arlresoutces of die Rcerve. Kedulod for Feb. 94.

llNWYAI 7.t Enromuea Mnagmeut of neatonal War To be detelrmned PIpelTANZA4 (GEF) Ltke Victoi Reional pro for mnge_ of Pepsao p amUGANDA Cr0 be deternod fiohaberies, lke polhtion, and land uin Wben formulated.

rmiibies of wetand A catclunent of lae VicoiArc. with objecic to: generae fod,M&TANIIJAW employent A iolwe., increase vahse

added fom f5ah procuan& wp

Uasc wate & cone biodi A

MALAWI 4.0 La11AMalawl Cooasvadoo BIadI lty Co vkkn ser Ics WorkPPro(GME) Of Elod bity Aruis fiaberanung and wUil be requied. VP approva scheduled

(MaawiTFuheicsProj.) biod mpgemt, public forMy 1994.awaen1 Ipa sitae -%iWbndl buldng

MALI 2LS Houseold n and COl Global Wairng To be detmined WorkProgrmm(GEF) Rductlem Rcductim of dcfrstion and cnmiion Appraisl repole im1.0 (Second Power Project) of greeihous gSer (GHG), nbtn p(BaklDA) of fuiwood by kerosne A S

MOZANBIQUZ 5.0 Tranaborder Cosaevatlo Ars Blodlveriuty Coulting Saevc WorkProgram(GRP) mEnarovse Suppo Project) Trabounday areu, nra reseulemet Wi be required Apprail aeh30.0 denmarto nagement pnning for Juy1994.(IDA) isidOn

NIGERA 25.0 sanvee Phred Gas Reducton GlObal Warming Coeutng Sevkie WorkProgm(GM) (Eavo Flad On Reducon) Reducdoan of revchouse gase through VW1 be required RVP apr epectd100.0 gSa f reduction ne efficicy by Febesy 1994.(Bask) and conervasov.

CLOBALINVIRON MN FACILITY ANNEX U-2QUA2TWRLY RECPORT ON DTh 1NTJPRECTS,

(AsfDCMebcrl, 1993)

icouryl Amount (SW) GE Proj CE-jlmpl_meang £Proebe (etodbi Objecte & C eonslt ltag fProcsifnI'ad[Aercy LUnder Aoatd BankProject) Project Descdption Sere Action on Procurment

UCANDA 43 EAd Fared Goril Reee Btodhrst To be idetermned WorkPnre s(GES) Pis Stafdig proect) Conserefioootbioloda ddiveasiy RVp approv -c a30.0 mid -al fnedecoystens. by Jnuya 1994.Pinola) a da g sireinhih Gvmmemes

Cacity to proted d mup

WEST AMCA 7.3 Commuty Consmtlon sad Bs4llwhfty To be determInd WorkProgrBURIaNAPASO (G ) Wdlih Utiization Gest de termire. Commuiiy bad Prqj under prepratioCOTE DWVOHtZ (Ta be determined) wildlife mtanageman 0-ourianJ by FAO. A 1raiaale

aidhustg duuled fw MayJune 1994.

ZAIRE U Bd r etslty Proteo Dodiwslty To be detaned Pnr4oePIpelb(GE) (Em tn) mprov managmnt of protected are Project pced in20.0 ep altetive fonet maagemet aAm; Renew Progm due to(DA) promote apoforetry and na al ce po a itio

managment aizBda nta upacbyfor poly azali, coy.

Z?viABWE LO Bkiodsky Cosarvaon la Bblvelf Local c utant W kProgram(CE!) Soutdled Zimbabwe Capfir pForm oca community hae bee dn d rojec under prpaion34.0 (Widlf and E _iromental wife managrmn blosg coidom wih PPA ofSDR300,000L([DA) agma-cu ProJect) cohabitaton of -iulr letork and SuppitmenaPPAis

nildife beiog processedApras sceduled forJune 1994.

[EASrASM

CHINA 20.0 Natur Consation Blodlverlty To be detemind ProjectPipelieWm of Foty (GEl) (FosttyDev. & Prtctio Blodherby cnsevation at pla pantice abnoe

30.0 Prect) csvm acdivie in J prior*t complted with(Bak) nauresisevs Mesarch di tramungr P_ Fro-ivests tFacie200.0 advane of$S1.63 $ m(DA) Appras ebedd for

January 1l95.

CHINA 10.0 Skbu Gas Transiston & Global Waning To be detrmned Work ProgramSicruanPe=ioun (Grp) Disbibuton Reduci ofps lakabge d gh RVP approval expectedAdhhrstaton 23.S (Shua Gas Dcv. and Cono.) effective detcons with rpai and by Mach 1994.

(GEF Cofn. sought) repacnt of l and sca with2SO. Italatio of effiient methane(ak) emiln monitordng equpmmt.

INDONESIA 7.0 Btdlvaraty Sytematc Bodlrtty Consultat Servn Wok ProgmTo be detenrmed (CM) coictuon Project would implement cimcalelemt t be oircd for Appraisalmisin

I (PFro staniig projet) of Indonesi bbdlvrity acio a pn Teebical AistAebScheduled foc April1994.It would tengtn scienific capaity, and Studisand restore and develop botankal andzoogical eatic conections inorder to mee demand for high qulatybiodis infomo

LAO PDR 5.0 Widlf & Protected Arm Mgit Bldlvority Consultn Servk Work Progm(GEF) (Porestry Managment PrOtectod ares system devepmet wll be rquired RVP aponl expced by37 and Consemioo) and manWnteent ct eniromental hnzUiay 1994.(DA) mnwitoring and evalation and community

patbcon in consertion progrFm

PHI1*1PPNE 30.0 Geotoenal Erwj Development GlobalWarming Consults dready Work ProgramNSAi Power Corp. (CEU) (LyteLzzi Ceodthernal C02 avoidance thoh replcement bired RVP appro epctedPhl Nal O Coz. 40.0 of coal-raaed power plant with by March 1994.

250.0 geothenul eoey Negoiao pected by(Bank) mid-Jan 1994.

GLOBAL RaNVMC44bcr FACILllY ANNEX IWQUARIRLY RICPORT ON INVE 5 PROJECrg

(N<teff. heel, 1993)

Counbyt Atmt 0na) GRP Proj CEFIrmplemtlg & Prbabl. (e.tandlngl Objeciv & Consulting Stage odeessI r "

lAggncy Leader Aaodated Bank Project) Project Descriptlon Services Acdon on Procurment

PHILXPPHN= 20.0 Conservation olPrlority lodtverq Short ter WorkPrormDept olfEn. (Cap) Protected Ana inqpictn u of th11egrad eoiutant in RVP a oval epeed byh Nat Rosmum 153.0 (Eavirnant and Nazal Proed Atta Systm to presu and proctd Ua Mh 1994.

(Bsk) Resources Sector A4 Pro%) reabilitate forcsts, coral oA, and660 wedands(MDA)

TIArLAND 20.0 Coavatio Aria Protnei Bwdlveit To be deterilned Project Plpdein(GMC) d Maagement _Iege protctdae Project pePa36.0 (Foresty Conarvasiuad mroagemen bloliverity proction; undeway. Preappralad(Bank) Develpnet) poicy iMA wMa ec* is scheduled for Feb 1994.12.0 Appriais sdedued(othrats co&aci beg sgt) for luly 199

PAKSTAN ILS Integrated Community Waste- Global Wanmlng To be determd W Progem(GE) to-Encrgy Sysen L-ad ga recoveryAui-aion. Appras1 scaodWM0 (Pnish Urban Eoa Proj.) majorretdmia soume globally fo Apr 1994Bak)

RECA

ARAL SEA 9.0 (CM ActiUo Plan Intatlonl Wite To be determined Projet Pipelin(CM (Programz Ph. rj Ideu ibcaton & nomm point souce; sca Project ndrpeparal

Ubtableowarng indusulpoludon Appraisal scheduled forDec. 1995.

BULGARIA I.S Blodivoralty Blodivertty To be detrmned ProjectPplineM1bwy Of (GEF) (Free sanding project) Ceaion of Nau Protection P je under prqpwaEnvitazta" (US AID) Agecy funded by ax camark, Appi scheduled for

NSiWParlP a MManaeetU Apri 1994.

BULGARIA 10.0 Iteated Gs Combind Cycle Global Wrmnng To be detmined Project Pipl(GEP) (Energy, ) IGCC Maed to refiner tnogpe mlu TORe for fety stdy

resldue; ad sldge go gentc power wnder pr%wation.with imopeowad efficiency. Appraisal seheduld for

July 1994.

CIS (RUSSIA, 60.0 OzoneDepleting Subdeance Ozone Protecton To be determined Prject PipeinBELARUS, UKRAV ) RducUon Identican f lury ODS reduction Peparo undewy

(ro be deta e) activilies. New teclhology for producto wh a PPA of SDR 360,000.recycling and ODSubstution Apprais scheduled for

Juno 1994.

CZECIIHREPUBLIC 23 Planning and Mab gnmnt of Blodivesiq To be deterined WorkPrgm(GEF) Czech Establsing ard fiancig smteinae RVP apprved Oct 19,

(Free standing project) netwok of potected sre; 'Ecoal 1993.Bank of Europe' program

SLOVAKXREPUBLIC 2.0 PlaIng and Mnaement of Blodiversity To be determined Work Progran(GEF) SMovakRes Estabishing and financing vAstabible RVP approd Sep. 16,

(Frec standing project) nwrk f prted ac, 'Ecological 1993.Bank of Europe' program

CZECHRlPUBLIC 2.3 Ozon Deplting Substances O)oe Protection To be detrmirned WorkProgm(GM) Reducion Identification ofkey ODS reduc RVP appovl expected

(Free sdng project) aSctitics. New technology for produttio by aauY 1994.recycling and OS tubsiitiom

SLOVAXIARZP. LS Ozone Deplting Substaon Ozone Pmtecon To be detamined WorkProga(GEl) ReducUon Idcntificaton of kcy ODS reduction RVP approS 1ped

(Fr slanding projct) ciiti. New technology for production by Jun 1994.recycling and ODS auhetion

GLOBAL 3V0NMdENT FACILIY ANNEX 1"QUARTERLY RElPORT ON IMTVWNT PROJECTS

(As ofDecmbe 15, 1993)

Cotoi Amount (Sm) GEF rr GEF?lmp lmentng & ProbheM (Fr-etndw Objective & Conulwting Stg ofProcIamg * adaen-e Lender As ited BankProjed) ProjectDecption Servie ActIon on Procrnmmt

POLANI 2s0 caMo.Gs covrlo Global Wartnig To be dermined WorkProgpsBank fir (GEF) (et S'ply RaInrc0sring Enar es ncd , nnal gas, RVP p1o'a eecEnvirtmmezl 340.0 and Consrvato) smadl induetry, household car by Much 1994.Protecton (Bank)

ROMANL4A an 4.0 Danube Dde Blodhwet Intentlonl Watem Blodblty Cons.v. To be detarmined Work ProvsUKRAINE (GEM) (Fm stalg prwoect) Wetands mnugemenr European RVP spovaeeced1&iauy of USS 4.5 m (Roania) gatoy idlif, Black 3-e 4ydlogit by March 1994.

En*nsmee US$ LS m (Ulw6e) bioogical filer.Danube Debt Biophm Awfbori/Dnube Delta mtlbte(RomaniaYDanube PlM e Rw Aud-S (Uhae)

RoMANLA tbd Fuel Cel Por Plazn Clobal Waring To be detedind Proje Ppel(Indtrial SectorEnegy Use of c¢d to hnpw efficiency and Prpaadt udeway withC onsvatioProjct) gerae l ctry for i plant PPA of SDR215,000.

Apprisa mehdued forJrme 1994.

RUSSlAN 3.2 GHG Reducion Natul Gsm Global Warming To be detemined WorkProgamFEDERATION (GEM) son Rcductio in GHG cnuions fim Apprl sde

(Petl eaS Loa) naturalw aprodui transrms , for Jqanay 194.disibutuon, and end-uw

UXRAI 20.Q Enng Co Untion Global Warming TO be determined ProjetPipele(GEF) (To be ddamin4 Energy Conservation Invasuaens to EPS to be lrued ahordy.

to incude 3 components codbed Apaisal sheduled formeda d eopmnt distrit betng July 1994.

cfficency, and Vs metering.

ALGERIA LS El }aa National Pek Blodlieslty To be deteremied Work Progm(GET) (Fre anding project) REr sit wedands conservatio RVP apprwo cectd

endangered spece mgay birds, January 194.dee;r,heoog

IRAN 2. Tr port E Dne Global Wang To be determined WrkProgram(GEF) (FP andin projec) Tranpt eet effi y uWgrade, RVP Zapoven

srategic planning, obs e_omnt in October 5, 1993.coefficet of urben manementWt- dei

JORDAN 15 MarIne Pofution Intealonal Waters To be detrmwd Projet PIpelIne(GEP) (Fre stnding project) Unique marine coeystem; coal fia Proj Preparation

irng commaeci and instridl underway. Apprac aactvity thrauth to cogyster land basd scheduled for Fdeuatypollution; strategic marngement punning 1995

MEDfrRRANEAN 10.0 Pot Watde Dtspoul Internationl Wate To be determined WorkProgmReagial Sea (GEF) (Algeri-Wase Dispoot Prqi Coordined regional damage control fam RVP approl cxpectedPo Dt Pro. 1410 Moroczo-Porte Sctor, oi spils and oil pollution, emnergency zrpen by 1anuaty 1994.Algeria (Bank) Tudsia-FAberis n) pILain sn ing regionalMorcco coopatio for menne pollutionTuntisa control

MOROCCO 460 Repowrrng olPoewrPlant Global Warming Conltnabt bde WorkProgram(GEP) (Free stdig project) Advanced cotnbusi tutbine for tined for feab Prepaai mdew *11k

open or clod cycle stea-m ity stud (PPA PPA of SDR 360,220tubine qtem mpoved efficiency Consultants Wm be Appeaisel shoedd for

needed for detod Apria 1994.dcsign A o aw w

CLOBAL ENVIRONMENT FACILITY ANNEX 11-6QUARTERLY REPORT ON TMNT PROJECTS

(As ofDcanber 15. 1993)

jCounb Amount (m) GE Proj GEFlplsnusting & Probabb (Pr-stadhW Objectve ConSultg Ste r oproceAng ^ a4

lAter-y Lender AssociatedBarekProlect) ProlectDescripdon S5ces Action on Procurement

TUSNIS1A 40 Solar Wtw Heang Global Warming To be d5t55uifd Work ProgramAegy Conevato and Reductio i GHG emissions from natwl Pepao uneway with

D coostrion Ptoject) go producton, arsawnissioo, diblutio PPA of SDR 145,000.and cad-me. AppMl shdcled

forM h 1994I

LAC

BRAZIL 30.0 BlodlveslProject Blodlverty To be detrlaed WorkProammisty of (GEF) (NaonlEnron t) Co of i RVP roapectd by

Envioocet 117.0 angrd speci July 1994.

BRA2IL 23.0 Blonas Gmasficatlon/Gas Turbin Clobal Warming To b dtermiuled ProjecPlpelmCHESFO (GEM) (To be determined) Gaicon of low calorfic valu reidues Appri cpected by

7.7 nd ener nope for hi efficiency Mach 1993.(UNDP GEF TA) ecoicky generation

CARIBBEAN 14.0 OECSWasemngment InenatIonalWers The Canadin narm WorkPrgaRECION (GM (OECS Want anagemen) A derontraion projoct i uppoet of Wat m t Preparato is under way.

11.4 MARPOL 73/70 and die -Special Ame coll vabo v wa wie PPA of SDR 370,000.(BnMA) dination of tgm Caribben a to dAppraisal aheduled for5.0 includ podt reception facilitico, and Janmuy 1994.(C=B) upgading oflstd-b d wasft5.0 ana0gement syeCMs.MMDl)

CARIBLEAN 5.5 Wider Caribbean lniatIve lbor Interntional Waters To be determined WorkProgmREGION Shlp-Gerste Waste (WCISW) Reional fismewek for disl, Preparation is und ay

(Free sadingTA project) reguladon, monitorig, enforement of with PPA of SDR lSS,000.MARPOL 73/71 Conveti and f tSpcpial RVP? app pcted byAra' designation of dhe Canbbean Se Apri 1994.

COSTA RICA 3.3 GHd-Integrtd Advanced Clobal Warming To be determined WorkPram(GgF) Wlndpower Project Fosil fuel displacement, commerdcal Approvd on December 1,500.0 (Eical Dvelopment and Energy scak wMd turbines, connected to 1993.(IDB) Convaton Project (1)B)) natonl grid

ECUADOR W.3 Blodily Proection Bdialty To be deermined WorkProgras(GEM) (To be detemied) Unique ecoystems. cdoeism, RVP app al expecd

endangered pecies, environmentsh by Febnuay 1994ecownmiu and fial polcy. stiutonalstrngthenInk riig

JAMAICA, 3. Deand Side anagement CGobal Waming RCG I Haglr, Work Proam(GE!) Demonstrto Absorption cMner, cogenea Blly Inc, RP pWoval expected4.15 (Free standing project) capcit bulding for private and slce by Februsey 1994.(1DB) public sector demand muangent0.237 * demonstrate potetl for electricity

savin' focus on commenial or wIth s

smal pilot for reidendal ging

MEXICO 10.0 Elact Powr End-Use Elli1cency Global Waming IEStromwh.Dac WorkPromComisie Federl (GE (Fr standing project) Compact fuores iulbe ad es. wm contactd RV1 appVa ecedde Eleclhhad inovie utty fnncion nr by Februxy 1994.(CFE) purchase, incentiv swhenms

oepdrational learir

GLOBAL ENVIRONM1:NT 1!ACSLITY ANNEX 114QUARTERLY RlPORT ON INESTr 4T PROJECTS

(As of Decmhber 15 1993)

Cauoatf Amout (Sm) GEF Praj GF?Implemuenti Probable Piref-tandbW Objetie & Costltg Stag *tPousleg * mld

lAgency Lmder Assodatad Bank Proiect) Proect Description Sen Acdon on PnKurumnt

PERU 4.0 Trust Fund for Coosvelon Unt Blodierat To be ddermlued We *kPrgaMi. oftAr. (GM (Fre esung pjroea) Endemisms rotecdon, Apprial sobeduled

15 augerd axecleW limd for Febusey 1994,(codm-ing fom GaM

* aiacag ofGE? project baed an proceseig saue:a) Pojet in GU Work Pro am ee that haw ben preseted frr w by Pa*ipant at sunimnume oftlIe GEP and hae beem r weed fee frthn

- _ md prsb) Prjec si GEU Pipel e ioe projct ich hbre pased the e cdical hurdles to be ;4huod in the FG Program but weot echeduted fe xppvl befor dtena semiannual mecthig of Pardiipants end he not beem pueontd to the Patkcpb for tercview. Ibe tbm bwdles xe Govenmeoft fonnal requeat fortc prjmtpasing a temkcal rnvw, and dearowe fadtit by the Ge enplcatation Comniuce. Projecs id cateo ar ncesesl lesm cerai i ema of cotent an comthn thoe im the GEP Wok Proam

PIZNAIE: MOSd93. 12117/93