\ ENGINEERING DATA TRANSMITTALPage 1 of j _
622746
2. To: (Receiving Organization)
Distribution5. Proj./Prog./Dept./Div.:Tank Waste RemediationSystems (TWRS)
3 . From: (O r i g i na t i ng Organizat ion)
Business Management & CFO6 . Cog. Engr . :
S. H. Rifaey
8. Originator Remarks:
For approval and re lease .
1 1 . Receiver Remarks: 11A Design Basel ine Document? I-Wes B$No
15. DATA TRANSMITTED(A)
itemNo.
1
(B) Document/Drawing No.
HNF-1946 vo l s . 1-3
(C)SheetNo.
ID)Rev.No.
0
: {E) Title or Description of DataTransmitted
TWRS Retrieval & DisposalMission I n i t i a l UpdatedBaseline Surmary
4 . Related EDT No. :
N/A7. Purchase Order No.:
N/A
9. Equip./Component No.:
N/A10. System/Bldg./Facility:
N/A12. Major Assm. Dwg. No. :
N/A13. Permit/Permit Application No.:
N/A14. Required Response Date:
1/5/98
CF)Approval
Desig-nator
N/A
(G)Reason
forTrans-mittal
1/2
CH)Origi-nator
Dispo-sition
l
( I )
Receiv-er
Dispo-sition
16. KEY
Approval Designator (F)
E. S. Q, D or N/A{see WHC-CM-3-6,Sec. 12.71
IG)
Rea-son
1
(HI
Disp.
Reason for Transmittal {SI
1. Approval 4. Review2. Release 6. Post-Review3. Information 6. Dist. Receipt Acknow. Required)
Disposition (H) &'(l)
1. Approved 4. Reviewed no/comment2. Approved w/commervt 5. Reviewed w/comment3. Disapproved w/comment 6. Receipt acknowledged
17. SIGNATURE/DISTRIBUTION(See Approval Designator for required signatures)
(J) Name IK) Signature ID Date (Ml MSIN
Design A u t h o r i t v ^ ^ * ^ ^ ^ ^ ^ ^ - . y
S. H. Rifaey ^ •> f^ ' ^ / i ' / 7 *R l -56Design Agent N/A
Cog.Eng. N/A
Cog. Mgr. N/A
OA H/A
Safety N/A
Env. N/A
W.*R. Swita //i/f^Signature of EDT A>a}6Originator
19.
Authorized Representative Datefor Receiving Organization
(J) Name (K) Signature (U Date <M) MSIN
Author (A)-A?-/d!Uc*
S^KRifaev sSs?&Cognizant Manager' Date ""*
(6)
Rea-son
1
1
IK)
Disp.
1
1
2 1 . DOE APPROVAL ( i f requ i red)C t r l . No.
[ ] Approved[ ] Approved w/comnents[ ] Disapproved u/comments
BD-7400-172-1
HNF-1946, Rev. 0
Tank Waste Remediation System Retrieval andDisposal Mission Initial Updated Baseline Summary
W.R. SwitaLockheed Martin Hanford Company, Richland, WA 99352U.S. Department of Energy Contract DE-AC06-96RL13200
EDT/ECN: 622746Org Code: 72220B&R Code: EW3130010
UC: 2030Charge Code: D215PTotal Pages: -193 18
Key Words: TWRS, Retrieval and Disposal Mission, Baseline Summary
Abstract: This document provides a summary of the proposed Tank WasteRemediation System Retrieval and Disposal Mission Initial UpdatedBaseline (scope, schedule, and cost) developed to demonstrate the TankWaste Remediation System contractor's Readiness-to-Proceed in support ofthe Phase IB mission.
TRADEMARK DISCLAIMER. Reference herein to any specific commercial product, process, or service bytrade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply itsendorsement, recommendation, or favoring by the United states Government or any agency thereof orits contractors or subcontractors.
Printed in the United States of America. To obtain copies of this document, contact: DocumentControl Services, P.O. Box 950, Mailstop H6-08, Richland WA 99352, Phone <509) 372-2420;Fax (509) 376-4989.
Approval Release Stamp
Approved for Public Release
A-6400-073 (01/97) GEF321
HNF-1946Volume 1
Rev. 0UC-510
Tank Waste Remediation SystemRetrieval and Disposal MissionInitial Updated Baseline Summary
W. R. Swita
M. R. LewisLockheed Martin Hanford Corporation
M. J. O'NeillMACTEC
Date PublishedJanuary 1998
Prepared by Lockheed Martin Hanford Corporation'Richland, Washington
Prepared for the U.S. Department of Energy
rrm. Fluor Daniel Hanford, Inc.C 3 P.O. Box 1000* a r Richland, Washington
Hanford Management and Integration Contractor for theU.S. Department of Energy under Contract DE-AC-0696-RL13200
Approved for Public Release; Further Dissemination Unlimited
HNF-1946Rev.O.
Document Title: Tank Waste Remediation System Retrieval and Disposal Mission InitialUpdated Baseline Summary
Approved by:H. L. Boston, Vice PresidentTank Waste RetrievalLockheed Martin Hanford Corporation
M. D. EbbenBusiness Management and CFOLockheed Martin Hanford Corporation
//rfnDate
Date'
HNF-1946Rev. 0
EXECUTIVE SUMMARY
This document provides a summary of the proposed Tank Waste Remediation System
Retrieval and Disposal Mission Initial Updated Baseline (scope, schedule, and cost) developed
to demonstrate the Tank Waste Remediation System contractor's Readiness-to-Proceed in
support of the Phase IB mission.
The document is comprised of the following sections: ' .
• An introduction, including a summary of the document and a description of the
Integrated Baseline planning process used to produce the scope, schedule, and
cost exhibits
. • Summary scope descriptions and exhibits, including Level I Logics which are key
documents for scope definition
• Summary schedule descriptions and exhibits, including an updated Project
Master Baseline Schedule depicting the Level 1 Logic activities
' Summary cost descriptions and exhibits, including a summary spreadsheet and
cost-loading report depicting costs resulting from the logic-driven, resource-
loaded schedule
HNF-1946 Rev. 0
• Summary program-level description of changes from the Fiscal Year 1998 Tank
Waste Remediation System Multi-Year Work Plan1 to the proposed Readiness-to-
Proceed Initial Updated Baseline.
This proposed Baseline has been integrated with the Mission Definition and Direction,
Management Plans and Procedures, and the Technical Baseline. The scope, schedules, and
associated costs demonstrate that the proposed baseline fully supports the private contractors'
facilities for Phase IB waste treatment. Necessary support activities include the following.
• Provide Waste Feed Delivery. .
• Provide interim storage of immobilized high-level waste products.
• Provide disposal of immobilized low-activity waste products.
• Provide disposal of byproduct wastes generated by the private contractors.
' Provide the infrastructure to support construction and. operations of the private'
contractors'facilities.
The data contained in this proposed Baseline have been incorporated in the Tank Waste
Remediation System Retrieval and Disposal Mission Phase .1 Financial Analysis2 and will serve
1 Lenseigne, D. L., 1997, Tank Waste Remediation System Fiscal Year 1998 Multi-YearWork Plan WBS1.1, HNF-SP-1230, Rev. 0, prepared by Lockheed MartinHanford Corporation for Fluor Daniel Hanford, Inc., Richland, Washington.
2 Wells, M. W., 1998, Tank Waste Remediation System Retrieval and Disposal MissionPhase 1 Financial Analysis, HNF-2017, Rev. 0, DRAFT, prepared by LockheedMartin Hanford Corporation for Fluor Daniel Hanford, Inc., Richland,Washington.
HNF-1946Rev. 0
as the basis for a subsequent formal change to the Tank Waste Remediation System Fiscal Year
1998 Multi- Year Work Plan Baseline.
HNF-1946 Rev. 0
CONTENTS
1.0 INTRODUCTION 1-11.1 SUMMARY : 1-11.2 BASELINE PLANNING PROCESS (SCOPE, SCHEDULE, AND COST) 1.-3
2.0 SCOPE -. 2-12.1 TANK WASTE REMEDIATION SYSTEM PROGRAM LOGIC 2-12.2 TWRS RETRIEVAL AND DISPOSAL WORK BREAKDOWN
STRUCTURE 2-12.3 FEED DELIVERY, STORAGE AND DISPOSAL MISSION SUMMARY . . . . 2-12.4 LEVEL 1 LOGICS . . ; 2-112.5 CROSSWALK FROM THE LEVEL 1 LOGIC TO THE WORK
•BREAKDOWN STRUCTURE 2-112.6 TWRS SCOPE/COST NOT .INCLUDED IN THE INITIAL
UPDATED BASELINE •. 2-11
3.0 SCHEDULE : ; . . . 3-13.1 SUMMARY SCHEDULE 3-13.2 SITE MASTER BASELINE SCHEDULE 3-13.3 PROJECT MASTER BASELINE SCHEDULE 3-13.4 MILESTONE COMPARISON .'. 3-1
4.0 COST 4-14.1 SUMMARY COST SPREADSHEET ' 4-14.2 DESCRIPTION OF THE TYPES OF COSTS 4-14.3 COST-LOADING REPORT 4-5
5.0 SIGNIFICANT PROGRAM-LEVEL CHANGES (SCOPE, SCHEDULE, COST) . . . . . . 5-15.1 RETRIEVAL PROJECT 5-15.2 IMMOBILIZED WASTE : 5-35.3 PRIVATIZATION INFRASTRUCTURE 5-4
6.0 REFERENCES 6-1
APPENDICES
A LEVEL 1 LOGICS A-i
B . GUIDANCE AND REQUIREMENTS TO DELIVERABLES CROSSWALK -TWRS RETRIEVAL AND DISPOSAL MISSION INITIAL UPDATEDBASELINE SUMMARY B-i
HNF-1946 Rev. 0
C GUIDANCE AND REQUIREMENTS TO DELIVERABLES
CROSSWALK - LEVEL 0 AND LEVEL 1 LOGICS C-i
VOLUME 2 LEVEL 1 LOGICS
LOW-ACTIVITY WASTE FEED LEVEL 1 LOGICS
• Figure A-1 LAW 1st Feed Batches, Tank 241-AN-105Figure A-2 LAW 2nd Feed Batches, Tank 241-AN-104Figure A-3 LAW 3rd Feed Batches, Tank 241 -AW-101Figure A-4 LAW 4th Feed Batches, Tank 241 -AN-103Figure A-5 LAW 5th Feed Batches, Tanks 241-AP-101 & 241-AW-104Figure A-6 LAW 6th Feed Batches, Tank 241-AY-101 \Figure A-7 LAW 7th & 8th Feed Batches, Tank 241 -AN-107Figure A-8 LAW 9th Feed Batches, Tank 241-AN-102Figure A-9 LAW 10th Feed Batches, Tank 241-AN-106
VOLUME 3 LEVEL 1 LOGICS
LOW-ACTIVITY WASTE FEED LEVEL 1 LOGICS
. Figure A-10 LAW 1 lth Feed Batches, Tank 241-SY-101Figure A-ll LAW 12thFeed Batches, Tank241-SY-103 • •
HIGH-LEVEL WASTE FEED LEVEL 1 LOGICS
Figure A-12 HLW 1st & 2nd Feed Batches,'First Tank 241-AZ-101• Figure A-13HLW 3rd & 4th Feed Batches, First Tank 241-AZ-102Figure A-14 HLW 5th-9th Feed Batches, 241-AY-102Figure A-15 HLW 10th - 12th Feed Batches, Tank 241-C-104
IMMOBILIZED LOW-ACTIVITY WASTE LEVEL 1 LOGICS
Figure A-16 Immobilized Waste ILAW
IMMOBILIZED HIGH-LEVEL WASTE LEVEL 1 LOGICS . .
Figure A-17 Immobilized Waste IHLW
INFRASTRUCTURE PHASE 1 LEVEL 1 LOGICS
Figure A-18 Phase 1 Privatization Support
HNF-1946Rev. 0
LIST OF FIGURES
1. Readiness-to-Proceed Document Hierarchy 1-2
2. Tank Waste Remediation System Retrieval and Disposal Mission Initial
Updated Baseline Summary Documents 1-4
3. Tank Waste Remediation System Program Logic 2-3
4. Tank Waste Retrieval and Disposal Work Breakdown Structure. - . . . . 2-5
5. Feed Delivery, Storage and Disposal Mission Summary 2-7
6. Summary Schedule 3-3
7. Site Master Baseline Schedule , . . . : 3-4
8. Project Master Baseline Schedule. 3-6
LIST OF TABLES
1. Crosswalk from the Level 1 Logic to the Work Breakdown Structure Level 6 2-13
2. Milestone Comparison. 3-52
3. Summary Cost Spreadsheet 4-3
4. Cost-Loading Report ,-...• 4-7
HNF-1946 Rev. 0
LIST OF TERMS
CEIS cost estimating input sheetDST double-shell tankFY fiscal yearHLW high-level wasteLAW low-activity wasteMYWP Multi-Year Work PlanPHMC Project Hanford Management ContractRL U.S. Department of Energy, Richland Operations OfficeRTP Readiness-to-ProceedSST single-shell tankTri-Party Agreement Hanford Federal Facility Agreement and Consent OrderTBR Technical Basis ReviewTWRS Tank Waste Remediation SystemWBS Work Breakdown Structure
HNF-1946 Rev. 0
TANK WASTE REMEDIATION SYSTEMRETRIEVAL AND DISPOSALMISSION INITIAL UPDATED
BASELINE SUMMARY
1.0 INTRODUCTION
1.1 SUMMARY
This document provides a summary of the Tank Waste Remediation System (TWRS)Retrieval and Disposal Mission Initial Updated Baseline (scope, schedule, and cost), developedto demonstrate Readiness-to-Proceed (RTP) in support of the TWRS Phase IB mission. ThisUpdated Baseline is the proposed TWRS plan to execute and measure the mission work scope.
This document and other supporting data demonstrate that the TWRS Project HanfordManagement Contract (PHMC) team is prepared to fully support Phase IB by executing thefollowing scope, schedule, and cost baseline activities.
• Deliver the specified initial low-activity waste (LAW) and high-level waste (HLW)feed batches in a safe manner to support private contractors' operations in June 2002.
• Deliver specified subsequent LAW and HLW feed batches during Phase IB in aconsistent, safe, and reliable manner.
• Provide for the interim storage of immobilized HLW products and the disposal ofimmobilized LAW products generated by the private contractors.
• Provide for disposal of byproduct wastes generated by the private contractors andreturned to the TWRS.
• Provide the infrastructure to support construction and operations of the privatecontractors' facilities.
As shown on Figure 1, Readiness-to-Proceed Document Hierarchy, and as discussed in the'Tank Waste Remediation System Retrieval and Disposal Mission Readiness-to ProceedMemorandum (Boston and Jordan 1998) and the Management Assessment of Tank WasteRemediation System Contractor Readiness-to-Proceed with Phase IB Privatization(Payne et al. 1998), this Initial Updated Baseline (HNF-1946) or the Programmatic Baseline is akey element of the Integrated Baseline. The Integrated Baseline also includes the Technical
1-1
Figure 1. Readiness-to-Proceed Document Hierarchy.Mission Definition and Direction
Mission •Requlremei
HartfordStrategic PlanDOE/RL-96-92
Privatization ContractorPhase 1 Contracts
OE-AC-9SRL1330S andDE-AC-96RL133Q9
Project HanfordManagement
ContractDE-AC06-96RL13200
Analysis Report IWF-SD-WM-MAR-008 I
Management Plans and Procedures Integrated Baseline
TWRS Retrievaland Disposal
i i o Waits Feedi Pl
ission WaitDelivery Pl
HNF-1881
Disposal MissionImmobilized Low-
Activity WasteDisposal Plan
F1S17
yDisposal
HMF-1S
TWRSRetrieval and
Disposal MissionInfra tlruetura Plan
HNF-18B2
TWRS RetrievalAuthorization
Basis AmondmontTask PlanHNF-1T22
High-Level WasteStorage Plan
HHF-1751
TWRS Salcty
Vol.lX,Soc1.1
TWRSQuality Assurance
Program Plan *HNF-IP-0842
Vol. XI.Sec.1.1
EnglnaeringManagamtnt Plan I
HHF-SD-WM-SEMP-002 I
TWRS Risk
HNF-SD-WM-PMP-01S
TWRS Rotrievat and TWRSConfiguration
Manag«m»nt PlarHMF-1900
>dtftnt tht iyt1*m»»r
TWRS Retileval andDisposal Mission
Technical BaselineSummary Description
HNF-1901
~5iunctions. Requirements, Specificationsrocets Flowsheets
utriorlzatlon Basisiterations and Maintenance Proceduresiterface Control Documents
Programmatic Baselln
TWRS Retrieval andDisposal Mission Initial
Updated BaselineSummary HNF-1MB
PreliminaryLevel I Logic
Enhancement am
X
<
o
TWRS • Tind Wait* Rtmtdlatlon *
V~\ " RTP Doilvorsblo* to RL• Read Ihoss-to-Proc sed Memotandun• 36-ltcm Checklist. Critical RIs^LUt• Guidance and Requirement* to
t CrosswalkDeliverable* Cros* Key Assumptions.•Financial Analysis
HNF-1946 Rev. 0
Baseline as documented in HNF-1901, Tank Waste Remediation System Retrieval and DisposalMission Technical Baseline Summary Description (Treat et al. 1998).
The Programmatic Baseline is consistent with and reflects the scope of work defined inHNF-1901 (Treat et al. 1998). Similarly, this Programmatic Baseline is consistent with andreflects the scope, schedule, and cost necessary to execute the Management Plans and Proceduresfor the mission/work including the Plans and Policies documented in the Tank WasteRemediation System Program Plan (Freeman 1998) and sub-tier plans as well as the Tools todevelop and control the mission/work as documented in the Tank Waste Remediation SystemSystems Engineering Management Plan (Peck 1998). The Programmatic Baseline is similarlyconsistent with the top-level Mission Definition and Direction documented in the Tank WasteRemediation System Mission Analysis Report (Acree 1998).
Figure 2 is a graphical depiction of the summary-level exhibits contained in this document.This document includes a short narrative that describes each of the exhibits for scope, schedule,and cost. Additional supporting documentation is available, as requested.
This Initial Updated Baseline represents a more thorough analysis of the scope, schedule,and cost than is contained in the current Tank Waste Remediation System Fiscal Year 1998Multi-Year Work Plan (MYWP) (Lenseigne 1997) Baseline and will serve as the basis for achange to the TWRS Baseline. A discussion of the systematic and controlled planning processused during RTP to develop the Initial Updated Baseline follows.
1.2 BASELINE PLANNING PROCESS (SCOPE,SCHEDULE, AND COST)
To conduct the RTP planning process, senior level multi-functional planning teams wereformed with technically knowledgeable representatives from Operations; Characterization;Retrieval; Projects; Nuclear Safety; Environmental, Safety, and Health and Quality Assurance;Engineering/Maintenance; U.S. Department of Energy, Richland Operations Office (RL)AVasteIntegration Team; Business Management (scheduling and cost estimating); and the ChiefFinancial Officer. Team leads were assigned to the planning effort commensurate with the typeof work being addressed. Use of these multi-functional planning teams ensures that interfacesare identified among performing organizations for each activity and series of activities and thatwork is integrated between programs, projects, and operations. Using technical productdescriptions prepared by the RTP team and integrated planning teams, the Initial UpdatedBaseline, depicted in Figures 1 and 2, was prepared.
The work scope for the Initial Updated Baseline is defined by Level 1 Logics preparedduring RTP for LAW and HLW feed delivery, Privatization Infrastructure, and ImmobilizedWaste. The logics are included in Appendix A. These logics portray the required activities tocomplete the Phase IB TWRS Retrieval and Disposal mission. Scope driven by logicdevelopment ensures consistency with the technical requirements and mission and validates the
1-3
HNF-1946 Rev. 0
Figure 2. Tank Waste Remediation System Retrieval and Disposal Mission Initial UpdatedBaseline Summary Documents.
Summary Documents
IntroductionDescription of theupdated baseline andbaseline development proi
Level 1 LogicsWaste Feed Delivery
(LAW and HLW)
Descriptionof the types of cost
KEYScope •
TWRS = Tank Waste Kemcdiallon SysteiWHS = Work Breakdown Structure.LAW" = Low-Activity WattleHLW = >Ugh-L«vd Wast*
1-4
HNF-1946 Rev. 0
need for the work. These Level 1 Logics replace the preliminary Feed Delivery Mid-LevelLogics developed in fiscal year (FY) 1997 for the current MYWP. Each activity on the Level 1Logic correlates to Level 7 of the TWRS Retrieval and Disposal work breakdown structure(WBS). Upon completion and validation of the Level 1 Logics by the planning team, aTechnical Basis Review (TBR) sheet was prepared to fully document and define the activity.The TBR sheets include the following information:
• Header information for activity identification, title, responsible organization,responsible manager, technical content, and duration
• Technical basis
• Reference documents and reports
• Enabling assumptions
• Functional requirements and deliverables
• Connection with other activities and/or organizations •
• Trade studies
• Decisions made/required
• Risk issues
• Plan to resolve risk
• Contacts
• Further action recommended.
These TBR sheets were written in accordance with a desk instruction for their preparation andacceptance. .
Using the scope and activity definition provided by the Level 1 Logic and TBR sheet, theplanning teams prepared draft TBR packages consisting of TBR sheets, Level 2 task orsubactivity logic networks, Level 2 Cost Estimating Input Sheets (CEIS), and cost loadingreports generated by the Primavera Systems, Inc. scheduling software. This level of detail wasnecessary to adequately define and document the basis for the scope, schedule, and resourceestimate at an executable task level. The Level 2 subactivity logics provide titles for the tasks,predecessor and successor activities, durations, and logic ties. The Level 2 CEIS defines the
1-5
HNF-1946 Rev. 0
scope, resources, and basis of estimate for each task. The following data are documented on eachCEIS: "
• Header information including task title, TBR number, activity owner, prepared by,date prepared, date updated, schedule activity identification number, financial datasystem work package/task package number, and duration
• Resource description
• Job category
• Organization code
• Cost element
• Fund type
• Note reference
• Total amount (of resource units)
• Units duration/tag
• Sub-task number
• Sub-task description
• Scope description
• Estimating assumptions/exclusions/risks
• Basis of estimate
• Estimate stage and method . . .
• Reference documents
• Notes.
The CEIS's were prepared by the planning teams with the assistance of professionalschedulers and cost estimators using detailed desk instructions and guidelines. These completedestimates are activity based and represent a well-documented, traceable scope and basis forestimate at the executable task level commensurate with the stage of the work and the level ofscope definition available. For Immobilized Waste, updated Activity Planning Forms and
1-6
HNF-1946Rev. 0
Estimating Work Sheets were prepared instead of the CEIS to document the requiredinformation. . •
Utilizing the Level 1 Logics and data from the TBR packages, a detailed integratedschedule was developed in the Primavera Systems, Inc. scheduling software. This schedule is atask-oriented, logically driven, resource-loaded critical path schedule that was summarized toproduce the Site Master Baseline Schedule (refer to Section 3.2, Figure 7) and the ProjectMaster Baseline Schedule (refer to Section 3.3, Figure 8). This schedule is traceable to thelogic, WBS, activity owner (performing organization), and CEIS. The schedule was reviewedand revised to refine logic, float, and critical path. Resources from the CEIS were loaded andpriced in the Primavera Systems, Inc. scheduling software to produce the cost profiles for workdefined in the Level 1 Logics. Fiscal year 1998 Fluor Daniel Hanford, Inc. approved labor ratetables were used in the Primavera Systems Inc. scheduling software for pricing. The final TBRpackages (Rev. 0) were prepared from the approved schedule consisting of and supported by theTBR sheets, subactivity logics, Primavera cost loading reports, and CEIS's. These packageswere signed by the activity owners and the TWRS Retrieval and Disposal Program and placedunder configuration control.
In addition to the schedules and costs developed from the Level 1 Logics and TBR 'packages, additional TWRS scope and costs have been included in the Initial Updated Baseline.These costs are summarized in Section 4.0, Cost. Additional detail and analysis are contained inthe Financial Analysis (Wells 1998). Data developed in the TBR packages provided bottoms-upenabling assumptions and risk management information used in the Financial Analysis to assessrisk. . .
1-7
HNF-1946Rev. 0
2.0 SCOPE
Scope has been defined by specific products developed/updated during the RTPdevelopment phase. These products are discussed in the following sections and are included asfigures or tables in this section.
2.1 TANK WASTE REMEDIATION SYSTEM PROGRAMLOGIC
The TWRS Program (Level 0) Logic (Figure 3) is the top-level TWRS. logic used toidentify the structure of activities necessary to achieve the entire integrated TWRS mission (life
' cycle). The TWRS Program Logic is the top-level basis for the RTP planning and is traceable tothe TWRS Retrieval and Disposal Mission Level 1 Logics. The Program Logic has beenannotated to identify the major program activities for Safe Storage, Phase 1, Phase 2, andClosure.
2.2 TWRS RETRIEVAL AND DISPOSAL WORKBREAKDOWN STRUCTURE
The TWRS Retrieval and Disposal WBS (Figure 4) depicts all TWRS Retrieval andDisposal mission work scope to WBS Level 6. It has been shaded to differentiate the WBSelements applicable to Phase 1 and Phase 2. The Waste Feed Delivery Level 6 WBS elementswere revised as a result of RTP planning to reflect the following: (1) authorized line item projectwork broken out by fund type and phase; (2) the addition of Project W-314 Phase 1; and(3) additional elements to segregate Retrieval Operations into Single-Shell Tanks, Double-ShellTanks, Characterization, and Safety Basis. This WBS is used as a framework for scopedefinition, scheduling, estimating, and managing the work.
2.3 FEED DELIVERY, STORAGE AND DISPOSALMISSION SUMMARY
The Feed Delivery, Storage and Disposal Mission Summary (Figure 5) provides a graphicalsummary of the mission for Retrieval, Projects, and Operations related to feed delivery andreturn of products from the private contractors. This summary uses the information .from theTank Waste Remediation System Operation and Utilization Plan (Kirkbride et al. 1997) and isconsistent with the RTP schedules.
2-1
HNF-1946 Rev. 0
Figure 3. Tank Waste RemediationSystem Program Logic.
TWRS Program Logic
SAFE STORAGE
T\TOS Levei-0 URev. 3Date: 12/19/97
2-3/4
Figure 4. Tank Waste Retrieval and Disposal Work Breakdown Structure.
11.1.3.5
Wist*Support
1
1.1.3.6Prtvatiiation
Phase1
11 ^11.3 7
Prfvnt&stlcii^Prwwa^
Administration
1.1.3.1.1.04LW-151 101-AZRetrieval (L)
1.1.3.1.1.06W-320 106-C
Sluicing
1.1.3.1.1.10Futurt DST
RetrievalProject
RetrievalOperation!
Characterization
1.1.3.1.1.04GW-151101-AZRetrieval (E)
Ml 1f11.Phase! :Rsttitval {
O t f J
W-314 PhSEO 1Reiteration
and SafeOperation* (E)
1151^02cio»ureDtSnlton
1 w 1 -!mv d z
1.1.3.4.1.03ILAW
PerformancAiEostmont (f
1.1.3.4.1ILAW
Storageand Disposal
1.1.3.4.1.01ILAW
ProjectAdmlnlstiallor
1.1.3.4.1.02ILAW
SystemsDennltlon
tomographyEquipment [C
1.1.3.4.1.05ILAW
Operation!
1.1.3X1.0$Project W-S2
Facility
1.1.3.4.1.07ILAW FacilityClosureJOSO
1134 X)iCsr&rOpsut*
ProjectAdmlntftntion
E -ExpIHLW - Immobilized high-level wasteILAW -Immobilizedlow-actlvltywatte
L = Line itemMSE •Management and Integration
MUST - Miscellaneous underground dorage tankPC - Pflvatft eonUaetor
SST « Slngle-thall tank
1 1 3 6 1 0 4HLWTre yImmobll i$lDeacUvato
HLWT/MfI b i t ;
11 S 1 02Pha e1
Inira structure
11 S10W 1
Infra tructuProjeel
1 81 04Ph»e 1
Mil Operation
11 -B106PlMMi
Ckuure/DSD
bttnuttructure
tiSSn
Acqulemon
PhawSPCOpwUor*
SO
[ ] - Pdtf»te Contnetor activily
Retrieval and Disposal Phase 1 activities
* Retrieval and Disposal balance of program
HNF-1946Rev. 0
Figure 5. Feed Delivery, Storage, and DisposalMission Summary (Sheet 1 of 2).
SHS5 riafc
G3"
^ r
C977 17dFH52021-5a
2-7/8
0XI6-Z
iMrldHMftljHohTo lrjf|H|V|HT3T~
•AV WI«1-3 o*wsa (SM1SS1)
J:
TVTr | , l i , I v^» 1,). |o i g vl r I . |^ | vjn I l - l f jr l~ l . l n I J k |O| |r I, ! „ I . In l< If |ol~ lo I, I r l« l»|« I , IFToTSI VTFTTTn I v[ | - | , |r jolMi
'(Z1° Z P3i{S) ^retrains uoissij^j
HNF-1946 Rev. 0
2.4 LEVEL 1 LOGICS
The Level 1 Logics were developed to define and detail the Phase 1 PHMC team scope ofwork and sequence of activities required to complete the TWRS Retrieval and Disposal Missionas reflected in the TWRS Retrieval and Disposal WBS. Level 1 Logics were prepared for Low-Activity Waste Feed (11 sheets), High-Level Waste Feed (4 sheets), Privatization Infrastructure(1 sheet), and the Immobilized Waste (2 sheets). These Logics are located in Appendix A.
These logics were used as the basis for preparation of the TBR packages, which define anddocument the scope, schedule, and cost estimates, and are under configuration control. TheLevel 1 Logics identify primary activity owners including Environmental, Nuclear Safety andLicensing, Characterization, Retrieval, TWRS private contractors, Operations, Projects, and RL.A critical path for each feed batch is shown. Only selected logic activities for the TWRS privatecontractors and RL are shown in the Level 1 Logics to depict necessary interfaces. As discussedin Section 4.0, a limited number of Phase 1 TWRS Retrieval and Disposal Mission activities arenot included in the Level 1 Logics.
2.5 CROSSWALK FROM THE LEVEL 1 LOGIC TO THEWORK BREAKDOWN STRUCTURE
This crosswalk (Table 1) shows the TWRS Retrieval and Disposal Level 1 Logic (activitynumber and title) crosswalked to the WBS Level 6.
2.6 TWRS SCOPE/COST NOT INCLUDED IN THEINITIAL UPDATED BASELINE
This section describes the TWRS scope/cost not included in the TWRS Retrieval andDisposal Mission Initial Updated Baseline. For a discussion of what costs are included, seeSections 4.1, Summary Cost Spreadsheet, and Section 4.2, Description of the Types of Cost.
The TWRS scope/cost not included in the Initial Updated Baseline is broken down asfollows:
• Required Waste Management facilities base operations and interfaces are funded bythe Waste Management Program (outside of TWRS):
222-S Laboratory support to tank characterization through FY 2034
242-A Evaporator support to AY/AZ Farm Sludge Washing and DiluteWastes through FY 2013
2-11
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
050.010
050.020
050.030
050.040
050.045
050.050
050.060
050.070
050.079A
050.079B
050.079C
050.080
050.085
050.090
050.100
050.110
050.120
050.130
050.150
110.010
110.010
110.030
110.045
110.047
110.050
110.060
110.070
110.070
110.090
120.A00
120.A00
120.A88
120.B10
120.B35
120.B40
120.B42
120.B45
120.B50
120.B58
11310106
11310106
11310106
11310106
11310106
11310106
11310106
11310106
11310106
11310106
11310106
11310112
11310106
11310106
11310106
11310106
11310106
11310106
11310106
1131014E
1131014P
11310106
1131014P
11310102
1131014E
1131014E
1131014E
11310.14P
1131014P
• 1131015E
1131015L
11310110
11310110
1131015L
11310112
1131015L
1131015L
1131015E
1131015E
W-320 Project Management
Design New Eqprrtnt -W-320 Includes C-106/AY-102
Construct New Eqpmnt - W-320 Includes C-106
Construct/ATP Original Equipment for W-320
Design/Equipment Support for W-320
Perform OTP for W-320
Prepare Safety Doc Basis for Interim Ops - W-320
Prep/Conduct ORR/Receive RL Approval - W-320
M-45-03A Initiate Sluicing Retrieval of C-106
. Action for DNFSB 93-5, 5.4.3.6.C
Start' Retrieval Secretary Sfty Initiative W-320
Interface (xfr Part of AY-102 Supernatant Out)
DOE-RLORR for W-320
Sluic Sludge Into AY-102-W-320.
Design Additional Equipment W-320
Construct Additional Equipment W-320
Test Additional Equipment W-320
Process Control Document - W-320
Turnover Tank C-106 to m i
W-151 Project Management
W-151 Project Management
Apprd Safety Basis for Mixer Pump Perform Test
Revise/Iss Mixer Pump Test Plans/Procedures
Perf Mixer Purtip Test Sampling & Analysis
Conduct LMHC Readiness Assessment
DOE Approval to Operate
Perform Mixer Pump Test (W-151)
Perform Mixer Pump Test (W-151)
Prepare Test Report (W-151)
W-211 Project Management
W-211 Project Management
Prepare for ORRAZ-101
Dsn/Install Central Control Room/Shift Ofc Facl
W-211 Design AP-102/AP-104 Retrieval Systems
Prepare AP-102/AP-104 for Turnoverto Project
W-211 Equip Procure AP-102/AP-104 Retrieval Syst
W-211 Construct AP-102/AP-104 Retrieval Systems
W-211 Startup AP-102/AP-104 Retrieval Systems
Prep for ORR on AP-102 & 104
2-13
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
Contract Independent ORR on AP-102 & 104
DOE ORR on AP-102 & 104
Obtain AY-101 Samples
Characterize AY-101
Review AY-101 Historical Data
Establish Dilution Rqmts for AY-101 Process Test
Confirm Plans and Requirements for AY-101
Update BBI & TCR For Tank AY-101
. Evaluate Equipment Rqmts in AY-101
Upgrade Waste Tank.AY-101 as Required
Develop LAW Confirm Tank T Meets Batch X DQO
Develop Waste Transfer to PC DQO
Develop In Tank Processing Control DQO
Evaluate AN-105 Samples for Adequate Matls
Develop DQO: PH 1 Tank Waste Transfer Control
Develop HLW Waste Delivery toPC DQO
Rvw AN-105 Historical Data/Conf if Add'l Info Rq
Estab Dilution Reqmnts/Diss Behav for AN-105
Characterize AN-105
Update Best Basis Inventory and TCR for AN-105
Perf Max Implied Radionuclide Concentrate Study
Confirm Plans and Requirements for AN-105
Establish New Envelope Limits (A/B Versus C)
Do Envelopes Apply to Bulk Comp or Liquid Phase?
Establish Methods/Proc to Estab Feed Composition
W-211 Design AN-105 Retrieval System
W-211 Equip Procurement AN-105 Retrieval System
W-211 Construction AN-105 Retrieval System
W-211 Startup AN-105 Retrieval System
Prep ORR AN-105
Contract Independent ORR AN-105
DOE ORR AN-105
Evaluate AN-104 Samples for Adequate Matls
Estab Dilution Reqmnts/Diss Behav for AN-104
Review AN-104 Historical Data
Characterize AN-104
Update Best Basis Inventory and TCR for AN-104
Confirm Plans and Requirements for AN-104
Revise W-211 FDC for AN-104
120.B60
120.B65
120.C05
120.C10
120.C12
120.C14
120.C15
120.C20
120.C25
120.C30
120.D07
120.D08
120.D09
120.D10
120.D11
120.D12
120.D15
120.D20
120.D25
120.D30
120.D35
120.D40
120.D45
120.D50
120.D55
120.D65
120.D72
120.D75
120.D80
120.D88
120.D90
120.D95
120.E05
120.E10
120.E15
120.E20
120.E25
120.E35
120.E40
1131015E
1131015E
11310102
11310102
11310102
11310102
• 11310102
11310102
11310103
11310110
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
11310102
1131015L
1131015L
1131015L
1131015E
• 1131015E
1131015E
1131015E
11310102
11310102
11310102
11310102
11310102
11310102
11310103
2-14
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
120.E50120.E52120.E55120.E60120.E68120.E70120.E75120.F40120.F50120.F52120.F60120.F68120.F80120.F90120.G05120.G10120.G15120.G20120.G25120.G35120.G37120.G38120.G39120.G40120.G50120.G52120.G55120.G60120.G68120.G70120.G75120.H10120.H15120.H20120.H30120.H50120.H60120.H68120.J05
1131015L1131015L1131015L1131015E1131015E1131015E1131015E1131015L1131015L1131015L1131015E1131015E1131015E1131015E113101021131010211310102113101021131010211310102113101021131010311310103113101031131015L1131015L1131Q15L1131015E1131015E
• 1131015E1131015E1131015L1131015L1131015L1131015E1131015E1131015E1131015E11310102
W-211 Design AN-104 Retrieval SystemW-211 Equip Procurement AN-104 Retrieval SystemW-211 Construction AN-104 Retrieval SystemW-211 Startup AN-104 Mixing & Retrieval SystemPrep for Readiness Rvw on 241-AN-104Contractor Independent ORR for 241-AN-104DOE ORR for 241-AN-104W-211 Design AZ-102 Retrieval SystemW-211 Construction AZ-102 Retrieval SystemW-211 Equip Procurement AZ-102 Retrieval SystemW-211 Startup AZ-102 Retrieval SystemPrepare for ORR AZ-102Contractor Independent ORR for AZ-102DOE ORR for AZ-102Evaluate AW-101 Samples Adequate MatlsEstab Dilution Reqmnts/Diss Behav for AW-101Review AW-101 Historical DataCharacterize AW-101Update Best Basis Inventory and TCR for AW-101Confirm Plans and Requirements for AW-101Eval Waste Retrieval Equip Req'd for Tanks 5 OnDecn Board/Acqn Strategy PHI Ret After AN-104Adjust Acquistion Strategy WFD System .Revise W-211 FDC for AW-101W-211 Design AW-101 Retrieval SystemW-211 Equip Procurement AW-101 Retrieval SystemW-211 Construction AW-101 Retrieval SystemW-211 Startup AW-101 Retrieval SystemPrep for ORR on AW-101Contract Independent ORR on AW-101DOE ORR on AW-101W-211 Design AY-102 Retrieval SystemW-211 Equip Procurement AY-102 Retrieval SystemW-211 Construction AY-102 Retrieval SystemW-211 Startup AY-102 Retrieval SystemContractor Independent ORR AY-102DOEORRAY-102Prepare for ORR AY-102Evaluate AN-103 Samples for Adequate Matls
2-15
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
i20.no120J15120.J20120.J25120.J35120.J40120.J50120.J52120.J55120J60120J68120.J70120.J75120.K05120.K10120.K15 .120.K20120.K25120.K35120.K40120.K50120.K52120.K55120.K60120.K68120.K70120.K75120X05120.L10120.L15120.L20120X25120X35120X36120X37120X38120X39120X40120.L41
1131010211310102113101021131010211310102113101031131015L1131015L1131015L1131015E1131015E1131015E1131015E113101021131010211310102113101021131010211310102113101031131015L1131015L1131015L1131015E1131015E1131015E1131015E1131010211310102
• 11310102113101021131010211310102113101031131010311310110113101101131010311310103
Estab Dilution Reqmnts/Diss Behav for AN-103Review AN-103 Historical DataCharacterize AN-103Update Best Basis Inventory and TCR for AN-103Confirm Plans and Requirements for AN-103Revise W-211 FDC for AN-103W-211 Design AN-103 Retrieval SystemW-211 Equip Procurement AN-103 Retrieval SystemW-211 Construction AN-103 Retrieval SystemW-211 Startup AN-103 Retrieval SystemPrep for ORR on 241-AN-103Contractor Independent ORR for 241-AN-103DOEORRfor241-AN-103Evaluate AN-107 Samples for Adequate MatlsEstab Dilution Reqmnts/Diss Behav for AN-107Review AN-107 Historical DataCharacterize AN-107Update Best Basis Inventory and TCR for AN-107Confirm Plans and Requirements for AN-107Revise W-211 FDC for AN-107W-211 Design AN-107 Retrieval System .W-211 Equip Procurement AN-107 Retrieval SystemW-211 Construction AN-107 Retrieval SystemUpgrd W-211 OTP/Ops Docmntn for AN-107 (Ops)'Prep for ORR for 241-AN-107Contractor Independent ORR for 241 -AN-107 .DOEORRfor241-AN-107Evaluate AN-102 Samples for Adequate MatlsEstab Dilution Reqmnts/Diss Behav for AN-102Review AN-102 Historical DataCharacterize AN-102Update Best Basis Inventory and TCR for AN-102Confirm Plans and Requirements for AN-102Approve FDC for Project W-TBDProvide Documentation for W-TBD ValidationValidate Project W-TBDDefine Project Management for W-TBDPrep W-TBD Prj Definition/Tech Basis/FDC241-AN-102 Upgrades: Prep Tech Rqmnts & CDR
2-16
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
120.L50120.L55120X60120.L68120.L70120X75120.M05120.M10120.M15120.M20120.M25120.M35120.M40120.M50120.M55120.M60120.M68120.M70120.M75120.P22120.P25120.P32120.P60120.P70120.P90120.R05120.R10120.R15120.R20120.R25 •
120.R35120.R40120.R50120.R52120.R55120:R60120.R68120.R70120.R75
113101101131011011310110113101101131011011310110113101021131010211310102113101021131010211310102113101031131011011310110113101101131011011310110113101101131015E1131015E113101031131015L
. 1131015E1131015E113101021131010211310102
. 11310102• 11310102
113101021131010311310110113101101131011011310110113101101131011011310110
241-AN-102 Upgrades: Design & Enviro. Permits241-AN-102 Upgrades: Const/ATP/Tumover/H14 Dwgs241-AN-102 Upgrades: Startup/OTP/Ops DocumentsPrep for ORR for 241-AN-102
. Contractor Independent ORR for 241-AN-102DOEORRfor241-AN-102 .Evaluate AN-106 Samples for Adequate MatlsEstab Dilution Reqmnts/Diss Behav for AN-106Review AN-106 Historical DataCharacterize AN-106
Update Best Basis Inventory and TCR for AN-106Confirm Plans and Requirements for AN-106241-AN-106 Upgrades: Prep Tech Rqmnts & CDR241-AN-106 Upgrades: Design & Enviro. Permits241-AN-106 Upgrades: Const/ATP/Turnover/H14 Dwgs241-AN-106 Upgrades: Startup/OTP/Ops DocumentsPrep for ORR on Tank 241-AN-106Contractor Independent ORR for 241-AN-106DOE ORR for 241-AN-106Contractor Independent ORR for SY-102DOE Operational Readiness Review for SY-102Validate SY-102 Design to DST SpecificationW-211 Construction SY-102 Retrieval SystemW-211 Startup SY-102 Retrieval SystemPrep for ORR on 241-SY-102 Project W-211Evaluate SY-101 Samples for Adequate MatlsEstab Dilution Reqmnts/Diss Behav for SY-101Review SY-101 Historical DataCharacterize SY-101Update Best Basis Inventory and TCR for SY-101Confirm Plans and Requirements for SY-101Revise W-TBD Design Specifications for SY-101Design Upgrade W-TBD for SY-101Equipment Procurement for SY-101Construct/Test/Project Turnover of SY-101Startup for SY-101 (W-TBD) Mixing & Retr SysPrep for ORR on 241-SY-101Contract Independent ORR on 241-SY-101DOE ORRon241-SY-101
2-17
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
120.T05
120.T10
120.T15
120.T20
120.T25
120.T35
120.T40
120.T50
120.T52
120.T55
120.T60
120.T68
120.T70
120.T75
120.V05
120.V10
120.V12
120.V14
120.V15
120.V20
120.V25
120.V30
120.W05
120.W10
120.W12
120.W14
120.W15
120.W20
120.W25
120.W30
120.X01
130.010
130.015 .
130.B05
130.B10
130.B15
130.B16
130.B17
130.B20
11310102
11310102
11310102
11310102
11310102
11310102
11310103
11310110
11310110
11310110
11310110
11310110
11310110
11310110
11310102
11310102
11310102
11310102
11310102
11310102
11310103
11310110
11310102
11310102
11310102
11310102
11310102
11310102
11310103
• 11310110
11350101
11310102
11310112
11310102
11310112
11310112
11310112
11310113
11310113
Evaluate SY-103 Samples for Adequate Matls
Estab Dilution Reqmnts/Diss Behav for SY-103
Review SY-103 Historical Data
Characterize SY-103
Update Best Basis Inventory and TCR for SY-103
Confirm Plans and Requirements for SY-103
Revise W-TBD Design Specifications for SY-103
Design Upgrade W-TBD for SY-103.
Equipment Procurement W-TBD for SY-103
Construct/Test/Project Turnover of SY-103
Startup for SY-103 (W-TBD) Mixing & Retr Sys
Prep for ORR on SY-103
Contract Independent ORR on SY-103
DOE ORR on SY-103 .
Obtain AP-101 Samples
Characterize AP-101
Review AP-101 Historical Data
Establish Dilution Rqmts for AP-101 Process Test
Confirm Plans and Requirements for AP-101
Update BBI & TCR For Tank AP-101
Evaluate Equipment Rqmts in AP-101
Upgrade Waste Tank AP-101 as Required
Obtain AW-104 Samples
Characterize AW-104
Review AW-104 Historical Data
Establish Dilution Rqmts for AW-104 Process Test
Confirm Plans and Requirements for AW-104
Update BBI & TCR For Tank AW-104
Evaluate Equipment Rqmts in AW-104
Upgrade Waste Tank AW-104 as Required
DOE-RL Private Contr Samp & Data Requiments
Phase I Tank Waste Transfer Control
Manage Waste Transfer System During Xfer Sys Upg
ID Reqd Spares WFD 1st Batches LAW & LAW
• Procure WFD Spare Equip (Operations)
Prep to Maintain the WFD Sys Operable
Maintain WFD Sys Operable
Devel Tech Basis: Rem Waste F/Watchlist Tanks
Obtain Permission to Add Diluent to FGWL DSTs
2-18
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
130.B25
130.B30
130.B40
130.B45
130.B55
130.B62
130.B65
130.B70
130.B75
130.B80
130.C10
130.C20
130.C25
130.E10
130.E25
130.E30
130.F10
130.F20
130.G10
130.G25
130.G30
130.G40
130.H10 .
130.H20
130.J10
130.J20
130.J25
130.J30
130.J40
130.K20
130.K30
130.K40
130X20
130.L30
130.L40
130.M20
130:M30
130.M40
130.N10
11310112
11310112
11310112
11310102
11310112
11310110
11310101
11310101
11310102
11310102
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
• 11310112
113101.12
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310102
Degas AN-105
Mob/Retr Wst in AN-105/Rec Feed in AP-102/AP-104
Perform Bootstrap Transfers.
Prepare for Sampling During LAW Feed Staging
Prepare Batch 1 Process Control Plan AN-105
Upgrd Valve Pits AW-A&B - W-454-Replace Jumpers
TWRS Management Assessment (LAW)
Prepare Plan/Document for Mgmt Assessment (LAW)
Compare RAM/O&M Concept w/ OTP Results
Assess Sec. Waste Util & Samp Anly Agnst Plans
Retrieve Waste in AY-101/Receive Feed in AP-102
Retrieve Waste in AY-101/Receive Feed in AP-104 .
Prepare AY-101 Process Control Plan
Degas AN-104
Prepar AN-104 Process Control Plan
Mob/Retr Wst in AN-104/Rec Feed in AP-102/104
B.S. Xfer AZ-102 Supemate into AY-101/AN-104
Prepare AZ-102 PRocess Control Plan
Degas AW-101
Prepare AW-101 Procoess Control Plan
Mob/Retr Wst in AW-101/Rec Feed in AP-102
Transfer 2nd Vendor Waste From AW-101 to AP-104
Bootstrap Trans AY-102 Supemate into AN-105
Prepare Tank 241-AY-102 Process Control Plan
Degas AN-103
Prepare C-104/AZ-101 Process Control Plan
Prepare AN-103 Process Control Plan
Transfer Wst in AN-103/Rec Feed in AP-102
Transfer Wst in AN-103/Rec Feed in AP-104
Prepare AN-107 Process Control Plan
Transfer Wst in AN-107/Rec Feed in AP-102
Transfer Wst in AN-107/Rec Feed in AP-104
Prepare AN' 102 Process Control Plan
Transfer Wst in AN-102/Rec Feed in AP-102
Transfer Wst in AN-102/Rec Feed in AP-104
Prepare AN-106 Process Control Plan
Transfer Wst in AN-106/Rec Feed in AP-102
Transfer Wst in AN-106/Rec Feed in AP-104
Prep for Sampling During HLW Feed Staging AZ-101
2-19
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
130.N20
130.N30
130.P50
130.R10
130.R25
130.R30
130.R35
130.R40
130.R45
130.R50
130.R55
130.T10
130.T25
130.T30
130.T35
130.T40
130.T45
130.T50
130.T55
130.V10
130.V20
130.V25
130.W10
130.W20
150.B04
150.B06
150.B08
150.B10
150.B14
150.B16
150.B17
150.B22
150.B22A
150.B22E
150.B24
150.B32
150.B34
150.B36
150.B38
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310112
. 11310112
11310112
11310112
11310112
11310112
11310112
11310112
11310102
11310102
11310102
11310113
11310113
• 11310113
11350102
11310102
11350102
11350102
11310102
11310112
. 11310114
11310114
11310114
Prepare Process Ctrl Plan AZ-101Btstrap Trans AZ-101 to AY-101Mob/Retr Wst in SY-102/Rec Feed in AW-105Degas SY-101Prepare SY-101 Process Control PlanMob/Retr 1st Wst in SY-101/Rec Feed in SY-102X-Site Transf 1st SY-101 from SY-102 to AN-102Mob/Retr 2nd Wst in SY-101/Rec Feed in SY-102Transfer 1st SY-101 from AN-102 to AP-102 :X-Site Transf 2nd SY-101 from SY-102 to AN-107Transf 2nd SY-101 from AN-107 to AP-104Degas SY-103Prepare SY-103 Process Control PlanMob/Retr Wst in SY-103/Rec Feed in SY-102X-Site Trfr Btch 1 SY-103/Feed SY-102 to AN-102Mob/Retr Wst in SY-103/Rec Feed in SY-102Trfr Btch 1 SY-103 Feed from AN-102 to AP-102X-Site Trfr Btch 2 SY-103/Feed SY-102 to AN-107Trfr Btch 2 SY-103 Feed from AN-107 to AP-104Retrieve Waste in AP-101/Receive Feed in AP-102Retrieve Waste in AP-101/Receive Feed in AP-104Prep AP-lOl/AW-104 BatchProcess Control PlanRetrieve Waste in AW-104/Receive.Feed in AP-102Retrieve Waste in AW-104/Receive Feed in AP-104Perform Feed Rate Trade StudyEstablish Feed Rates (RL Decision)Maintain WFD Char Matrices, Prob Spec DQOsSafety Analysis and EvaluationDevelop/Establish TSRsUpdate/Amend Auth Basis for WFD ActivitiesMaintain Authorization BasisMaintain Operations Utilization PlanM-45-02D Sub Annual SST Ret Seg Doc to EcologyM-45-02C Sub Annual SST Ret Seg Doc to EcologyMaintain ICDsMix AN-105 Feed in AP-102Obtain AN-105 Feed Qual Samples from AP-102Provide AN-105 Samples from AP-102 to PC 1Analy AN-105 Smpls/Interpret Results from AP-102
2-20
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
150.B40150.B42150.B44150.B46H150.B4S150.B501-50.B52150.B54150.B56150.B58150.B60150.B63H150.B66150.B68150.B70150.B76150.B78150.B80150.B82150.B84150.B86150.B88150.B90150.B92150.B94150.B96150.B98150.C05150.C10150.C15150.C20150.C25 ..150.C30150.C35150.C40150.C45150.C50150.C55150.C60
1131011411310112113101121135011211310112113101141131011411310114
. 1131011411310112113101121135011211380102113501121135011211380102113501121135011211310102113101021135011211380102113501121135011211380102113801021138010211310112
• 11310114• 11310114
113101141131011411310112113101121131011211310114113101141131011411310114
Prov AN-105 Feed Batch Info from AP-102 to PC 1Adjust AN-105 Feed in AP-102Deliver AN-105 Feed to AP-106TWRS E1S ROD Hold Point 2Mix AN-105 Feed in AP-104Obtain AN-105 Feed Qual Samples from AP-104Provide AN-105 Samples from AP-104 to PC 2Analy AN-105 Smpls/Interpret Results fromAP-104Provide AN-105 Feed Batch Info to PC 2Adjust AN-105 Feed in AP-104Deliver AN-105 Feed to AP-108TWRS EIS ROD Hold Point 1Ready PHMC Oper/Maint Doc-AP-108 TurnoverExecute Tank Turnover Procedure - PC 2RL Declares AP-108 Ready - Contractor 2Ready PHMC Oper/Maint Doc-AP-106 TurnoverExecute Tank Turnover Procedure - PC 1RL Declares AP-106 Ready - Contractor 1Perform Feed Tank Fill Status Trade StudyEstablish Feed Tank Fill Status (RL Decision)Final ICD for Waste Feed Tank AP-106 - PC 1Prep AP-106 for Turnover to Private ContractorFinal ICD for LAW Feed - PC 2Final ICD for LAW Feed - PC 1Establish Interface Reqmnts for Tank TurnoverFinal ICD for Waste Feed Tank AP-108 - PC 2Prep AP-108 for Turnoverto Private ContractorMix AY-101 Feed in AP-102 -Obtain AY-101 Feed Qual Samples from AP-102Provide AY-101 Samples from AP-102 to PC 1Analy AY-101 Smpls/Interpret Results from AP-102Provide AY-101 Feed Batch Info to PC 1Adjust AY-101 Feed in AP-102Deliver AY-101 Feed from AP-102 to AP-106Mix AY-101 Feed in AP-104Obtain AY-101 Feed Qual Samples from AP-104Provide AY-101 Samples from AP-104 to PC 2Analy AY-101 Smpls/Interpret Results from AP-104Prov AY-101 Feed Batch Info from AP-104 to PC 2
2-21
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
Adjust AY-101 Feed in AP-104Deliver AY-101 Feed from AP-104 to AP-108Mix AN-104 Feed in AP-102Obtain AN-104 Feed Qual Samples from AP-102Provide AN-104 Samples from AP-102 to PC 1Analy AN-104 Smpls/Interpret Results from AP-102Provide AN-104 Feed Batch Info to PC 1Adjust AN-104 Feed in AP-102Deliver AN-104 Feed from AP-102 to AP-106Mix AN-104 Feed in AP-104Obtain AN-104 Feed Qual Samples from AP-104Provide AN-104 Samples from AP-104 to PC 2Analy AN-104 Smpls/Interpret Results from AP-104Prov AN-104 Feed Batch Info from AP-104 to PC 2Empty AP-107 Into AN^l 04 for Vendor ReturnsAdjust AN-104 Feed in AP-104Deliver AN-104 Feed from AP-104 to AP-108Mix AW-101 Feed in AP-102Obtain AW-101 Feed Qual Samples from AP-102Provide AW-101 Samples from AP-102 to PC 1Analy AW-101 Smpls/Interpret Results from AP-102Prov AW-101 Feed Batch Info from AP-102 to PC 1 .Adjust AW-101 Feed in AP-102Deliver AW-101 Feed from AP-102 to AP-106Mix AW-101 Feed in AP-104Obtain AW-101 Feed Qual Samples from AP-104Provide AW-101 Samples from AP-104 to PC 2Analy AW-101 Smpls/Interpret Results from AP-104Prov AW-101 Feed Batch Info from AP-104 to PC 2Adjust AW-101 Feed in AP-104Deliver AW-101 Feed from AP-104 to AP-108Mix AN-103 Feed in AP-102Obtain AN-103 Feed Qual Samples from AP-102Provide AN-103 Samples from AP-102 to PC 1Analy AN-103 Smpls/Interpret Results from AP-102Provide AN-103 Feed Batch Info to PC 1Adjust AN-103 Feed in AP-102Deliver AN-103 Feed from AP-102 to AP-106Mix AN-103 Feed in AP-104
150.C65150.C70
150.E05
150.E10
150.E15
150.E20
150.E25
150.E30
150.E35
150.E40
150.E45
150.E50
150.E55
150.E60
150.E64
150.E65
150.E70
150.G05
150.G10150.G15
150.G20
150.G25
150.G30
150.G35
150.G40
150.G45
150.G50
150.G55.
150.G60
150.G65
150.G70
150.105
150.J10
150.J15
150J20
150.J25
150.J30 .
150.J35
150.J40
1131011211310112
11310112
11310114
11310114
11310114
11310114
11310112
11310112
11310112
11310114
11310114
11310114
11310114
11310112
11310112
11310112
.1131011211310114
11310114
. 11310114
' 11310114
11310112
11310112
11310112
11310114
11310114
11310114
11310114• 11310112
11310112
11310112
11310114
11310114
11310114
11310114
11310112
11310112
11310112
2-22
HNF-1946Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
150.J45150.J50150.J55150.J60150.J65150.J70150.K05150.K10150.K15150.K20150.K25 •150.K30150.K35150.K37150.K70150.K72150X05150.L10150.L15150.L20150X25150X30150X35150X40150X45150X50150X55150X60150X65150X70150.M05150.M10150.M15150.M20150.M25150.M30150.M35150.M40150.M45
1131011411310114113101141131011411310112113101121131011211310114113101141131011411310114113101121131011211310112 •113101121131011211310112113101141131011411310114113101141131011211310112113101121131011411310114113101141131011411310112
' 11310112113101121131011411310114113101141131011411310112113101121131011211310114
Obtain AN-103 Feed Qual Samples from AP-104Provide AN-103 Samples from AP-104 to PC 2Analy AN-103 Smpls/Interpret Results from AP-104Prov AN-103 Feed Batch Info from AP-104 to PC 2Adjust AN-103 Feed in AP-104Deliver AN-103 Feed from AP-104 to AP-108Mix AN-107 Feed in AP-102Obtain AN-107 Feed Qual Samples from AP-102Provide AN-107 Samples from AP-102 to PC 1Analy AN-107 Smpls/Interpret Results from AP-102Prov AN-107 Feed Batch Info from AP-102 to PC 1Adjust AN-107 Feed . .Deliver AN-107 Feed from AP-102 to AP-106Deliver AN-107 Feed from AP-102 to AP-106Deliver AN-107 Feed from AP-104 to AP-108Deliver AN-107 Feed from AP-104 to AP-108MixAN-102 Feed in AP-102 . • •Obtain AN-102 Feed Qual Samples from AP-102Provide AN-102 Samples from AP-102 to PC 1Analy AN-102 Smpls/Interpret Results from AP-102Prov AN-102 Feed Batch Info from AP-102 to PC 1Adjust AN-102 Feed in AP-102Deliver AN-102 Feed from AP-102 to AP-106Mix AN-102 Feed in AP-104Obtain AN-102 Feed Qual Samples from AP-104Provide AN-102 Samples from AP-104 to PC 2Analy AN-102 Smpls/Interpret Results from AP-104Provi AN-102 Feed Batch Info from AP-104 to PC 2Adjust AN-102 Feed in AP-104 •Deliver AN-102 Feed from AP-104 to AP-108Mix AN-106 Feed in AP-102Obtain AN-106 Feed Qual Samples from AP-102Provide AN-106 Samples from AP-102 to PC 1Analy AN-106 Smpls/Interpret Results from AP-102Prov AN-106 Feed Batch Info from AP-102 to PC 1Adjust AN-106 Feed in AP-102Deliver AN-106 Feed from AP-102 to AP-106Mix AN-106 Feed in AP-104Obtain AN-106 Feed Qual Samples from AP-104
2-23
HNF-1946 Rev. 0 'Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
150.M50
150.M55
150.M60
150.M65
150.M70
150.R05
150.R10
150.R15
150.R20
150.R25
150.R30
150.R35
150.R40
150.R45
150.R50
150.R55
150.R60
150.R65
150.R70
150.T05
150.T10
150.T15
150.T20
150.T25
150.T30
150.T35
150.T40
150.T45
150.T50
150.T55
150.T60
150.T65
150.T70
150.V05
150.V10
150.V15
150.V20
150.V25
150.V30
11310114
11310114
11310114
11310112
11310112
11310112
11310114
11310114
11310114
11310114
11310112
11310112
11310112
11310114
11310114
11310114
11310114
11310112
11310112
11310112
11310114
11310114
11310114
11310114
11310112
11310112
11310112
11310114
11310114
• 11310114
11310114
11310112
11310112
11310112
11310114
11310114
11310114
11310114
11310112
Provide AN-106 Samples from AP-104 to PC 2
Analy AN-106 Smpls/Interpret Results from AP-104
Prov AN-106 Feed Batch Info from AP-104 to PC 2
Adjust AN-106 Feed in AP-104
Deliver AN-106 Feed from AP-104 to AP-108
Mix SY-101 Feed in AP-102
Obtain SY-101 Feed Qual Samples from AP-102
Provide SY-101 Samples from AP-102 to PC 1
Analy SY-101 Smpls/Interpret Results from AP-102
Prov SY-101 Feed Batch Info from AP-102 to PC 1
Adjust SY-101 Feed in AP-102
Deliver SY-101 Feed from AP-102 to AP-106
Mix.SY-101 Feed in AP-104
Obtain SY-101 Feed Qual Samples from AP-104
Provide SY-101 Samples from AP-104 to PC 2
Analy SY-101 Smpls/Interpret Results from AP-104
Prov SY-101 Feed Batch Info from AP-104 to PC 2
Adjust SY-101 Feed in APrlO4 ••
Deliver SY-101 Feed from AP-104 to AP-108
Mix SY-103 Feed in AP-102
Obtain SY-103 Feed Qual Samples from AP-102
Provide SY-103 Samples from AP-102 to PC 1
Analy SY-103 Smpls/Interpret Results from AP-102
Prov SY-103 Feed Batch Info from AP-102 to PC 1
Adjust SY-103 Feed in AP-102
Deliver SY-103 Feed from AP-102 to AP-106
Mix SY-103 Feed in AP-104
Obtain SY-103 Feed Qual Samples from AP-104
Provide SY-103 Samples from AP-104 to PC 2
Analy SY-103 Smpls/Interpret Results from AP-104
Prov SY-103 Feed Batch Info from AP-104 to PC 2
Adjust SY-103 Feed in AP-104
Deliver SY-103 Feed from AP-104 to AP-108
Mix AP-101 Feed in AP-102
Obtain AP-101 Feed Qual Samples from AP-102
Provide AP-101 Samples from AP-102 to PC 1
Analy AP-101 Smpls/Interpret Results from AP-102
Provide AP-101 Feed Batch Info to PC 1
Adjust AP-101 Feed in AP-102
2-24
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
150.V35150.V40150.V45150.V50150.V55150.V60150.V65150.V70160.A00160.A02160.A12160.A13160.A15160.A16160.A17160.A18160.A19160.A20160.A22160.A25160.A26160.A32160.A36160.A38160.A40160 .A41160.A42160.A43160.A44160.A46160.A48160.A50160.A52160.A62160.A64160.A66160.A68160.A70160.A72
1131011211310112113101141131011411310114113101141131011211310112113501021135010111310102113101011131010211310102113101021131010111310102113101021131010211310114113101031131011011310110113101101131011011310110113101101131010211310102
' 11310102113101021131010211310112113101121131011211310114113101141136010411310112
Deliver AP-101 Feed from AP-102 to AP-106Mix AP-101 Feed in AP-104Obtain AP-101 Feed Qual Samples from AP-104Provide AP-101 Samples from Ap-104 to PC 2Analy AP-101 Smpls/Interpret Results from AP-104ProvAP-101 Feed Batch Info From Ap-104 to PC 2Adjust AP-101 Feed in AP-104Deliver AP-101 Feed from AP-104.to AP-108Final ICD for HLW Feed (ID 20)Contract and ICDEstab Tech (Process) Reqmnts-Phase I Sldg PretPrepare Plan/Document for Mgmt Assessment (HLW)Assess Sec Waste, Util Samp Anly Agst Plan (HLW)Prep DQO for Privatization Char of Pot HLW FeedCompare RAM/O&M Concept w/ OTP Results (HLW)TWRS Management Assessment (HLW)Retr. Revise .Pretreat Rqmts (AZ-101/2 & AY-102)Finalize HLW Pretreat Rqmts (AZ-101/2 & AY-102) .Determine Appropriate Alternative TanksUpdate BBI & TCR to Reflect Process Test AZ-101Devel Tech Rqmts & CDR For Addl Eqpt in AZ-101Redesign Addl Eqpt Req'd for Sludge Wash-AZ-101Construct Equip Req'd for Sludge Washing-AZ-101Upgrade AZ-101 W-xxxContractor Independent ORR for AZ-101Develop Draft Sludge Wash Temp Control RqmtsDOE ORR for AZ-101Optimize PHI Feed Sludge Wash by Proc SimulationDeter if Existing Data Meets DQO Needs - AZ-101Take Additional Grab Samples from AZ-101Perf/Doc Smpl Analysis/Sldg Wash Test-AZ-101Verify that AZ-101 is Acceptable for Feed to PCPretreat AZ-101 (In-Tank Sludge Washing)Perf Final Decant/Add Transfer Solution - AZ-101Mix Waste to Resuspend Solids for AZ-101Obtain HLW Feed Qual Grab Samples AZ-101 SolidsEval Samples/Establish MT for AZ-101PC Conduct Waste Form Qualification - AZ-101Deliver Second Batch of Feed from AZ-101
2-25
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
160.A74
160.A76
160.A78
160.F00
160.F05
160.F10
160.F12
160.F15
160.F30
160.F50
160.F55 .
160.F65
160.F70 '
160.F75
160.F80
160.F85
160.F90
160.F95
160.F99
160.H00
160.H05
160.H17
160.H20
160.H22
160.H25
160.H27
160.H45
160.H47
160 .H50
160.H55
160.H60
160.H65
160.H70
160.H75
160.H80
160.H85
160.H90
160 .H95
160J00
11310114
11310114
11310112
11310102
11310102
11310102
11310102
11310102
11310103
11310114
11310114
11310112
11310112
11310112
11360102
11310114
11310114
11310112
11310112
11310102
11310102
11310103
11310102
11310102
11310114
11310112
11310112
11310112
11310114
• 11310114
11360114
11310114
11310114
11310112
11310112
11310112
11310112
11310112
11310102
Provide Separate Samples to the PC - AZ-101
Prov MT Non-Volatile Oxides Exclude Na/Si-AZ-101
Deliver First Batch of Feed from AZ-101
Deter if Existing Data Meets DQO Needs - AZ-102
Obtain Core Smpls/Prep Subsmpls/Comp for AZ-102
PerffDoc Smpl Analysis/SldgWash Testing - AZ-102
Update BBI and TCR for AZ-102
Confirm that AZ-102 is Acceptable for Feed to PC
Revise W-211 FDC for AZ-102
Obtain HLW Feed Qual Grab Samples AZ-102 Solids
Eval Smpls/Estab MTof Non-Volatile for AZ-102
Pretreat AZ-102 (In-Tank Sludge Washing)
Perf Final Decant/Add Transfer Solution -AZ-102 .
Mix Waste to Resuspend Solids for AZ-102
PC Conduct Waste Form Qual Confirmation-AZ-102
Provide Separate Samples to Private Contractor
Provide MT Non-Volatile Oxides Excluding Na/Si
Deliver First Batch of Feed from AZ-102
Deliver Second Batch of Feed from A Z - 1 0 2 .
Deter if Existing Data Meets DQO Needs - AY-102
Obtn Core Smpls/Prep Subsmpls/Comp for AY-102
Revise W-211 FDC for AY-102
Perf/Doc Smpl Analysis/Sldg Wash Testing-AY-102
Update BBI and TCR for AY-102
Confirm that AY-102 is Acceptable for Feed to PC
Pretreat AY-102 (In-Tank Sludge Washing)
Perf Final Decant/Add Transfer Solution-AY-102
Mix Waste to Resuspend Solids for AY-102
Obtain HLW Feed Qual Grab Samples AY-102 Solids
. Eval Smpls/Estab MT of Non-Volatile for AY-102
PC Conduct Waste Form Qual/Confirmation-AY-102
Provide MT Non-Volatile Oxides Excluding Na/Si
Provide Separate Samples to PC - AY-102
Deliver First Batch of Feed from AY-102
Deliver Second Batch of Feed from AY-102
Deliver Third Batch of Feed from AY-102
Deliver Fourth Batch of Feed from AY-102
Deliver Fifth Batch of Feed from AY-102
Deter if Existing Data Meets DQO Needs - C-104
2-26
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
DescriptionLevel 1 Logic Level 6 WBS
160.J05
160.J10
160.J12
160.J15
160.J50
160.J55
160.J65
160.J70
160J75160.J80
160.J85
160J90
160.J95
160.J97
160.J99
250.110
250.120
250.130
250.4A0
250.4C0
250.4DO
250.4E0
250.4E5
250.4F0
250.4G0
250.C01
250.T01250.T011
250.T013
250.T014
250.T015
250.TA
270.J99
270.J99
270.J99
330.010
330.010
330.010
330.020
11310102
11310102
11310102
11310102
11310114
11310114
11310112
11310112
11310112
11310102
11310114
11310114
11310112
11310112
11310112
11310126
11310126
1131014011310126
11310126
11310126
11310126
1131012611310126
11310126
11310126
11360126
1136012611360126
• 11360126
11360126
11360126
11310103
11310107
11310109
11380101
11380103
1138.0104
11380102
Obtain Core Smpls/Prep Subsmpls/Comp for C-104Perf/Doc Smpl Analysis/SldgWash Testing C-104Update BBI and TCR for C-104Confirm that C-104 is Acceptable for Feed to PCObtain HLW Feed Qual Grab Samp C-104/AZ-101Eval Smpls/Estab MT of Non-Volatile for C-104PretreatC-104/AZ-101 (In-Tank Sludge Washing) .Perf Decant/Add Transfer Solution - C-104/AZ-101Mix Waste to Resuspend Solids for C-104/AZ-101PC Conduct Waste Form Qual Confirm -C-104/AZ-101Provide Separate Samples to Private ContractorProvide MT Non-Volatile Oxides Excluding Na/SiDeliver 1st Batch of Feed from C-104/AZ-101Deliver 2nd Batch of Feed from C-104/AZ-101Deliver 3rd Batch of Feed from C-104/AZ-101Proj ect W-314 (Phase I) ManagementProject W-314 (Phase I) Permits/Safety AnalysisProject W-314 (Phase I) ImplementationW-314 Master Pump Shut Down UpgradesW-314 Upgrades to AN FarmW-314 AZ Farm UpgradesW-314 200 E/W Piping UpgradesPrepare AW Farm for Construction ActitiviesW-314 AW Farm UpgradesW-314 Upgrades to AY FarmPrepare AN Tank Farm for W-314 ConstructionM-43-12 Start Const for Upgrade in 1st FarmM-43-11 Provide W-314 Const Sched to EcologyM-43-13 Start Const for Upgrade in 2nd FarmM-43-14 Start Const for Upgrade in 3rd FarmM-43-15 Start Const for Upgrade in 4th FarmW-314 Complete Phase 1ISSTRS Prj 1st Tank C-104 & Retrieve to AN-105 . .ISSTRS Prj 1st Tank C-104 & Retrieve to AN-105ISSTRS Prj 1st Tank C-104 & Retrieve to AN-105Project Administration/Management/EngineeringProject Administration/Management/EngineeringProject Administration/Management/EngineeringSystems Definition
2-27
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
Systems Definition
IC Document Revisions/IC Drawings
Compl Infrastructure Electrical Sys Contract Pkg
Design/Construction/Startup Electrical System
Dsn/Construction Site Sys for PC Construction
Dsn/Construct/S/up Water, Site, Liq Eff Systems
Maint/Op/Provide Vendor Utils for Constr PC Phi
Maint/Op/Provide Vendor Utils for Constr PC Phi
Maint/Op/Prov Vendor UtilsAVst Disp S/up PC Phi
Maint/Op/Prov Vendor UtilsAVst Disp S/up PC Phi
Maint/Op/Prov VendorAVst Disp Prodctn PC Phi
Maint/Op/Prov VendorAVst Disp Prodctn PC Phi
Provide Vendor Staff Training
PC Complete Phase 1A Deliverables
Modify AP-106 As Needed/Tie-in - PC 1
PC 1 Processes AN-105 Feed from AP-106
PC 1 Processes AN-104 Feed from AP-106
PC 1 Processes AW-101 Feed from AP-106
PC 1 Processes AN-103 Feed from AP-106
PC 1 Processes AP-101 Feed from AP-106
PC 1 Processes AY-101 Feed from AP-106
PC 1 Processes AN-107 Feed from AP-106
Contract #1 Process 7th Feed Batch
PC 1 Processes AN-102 Feed from AP-106
PC 1 Processes AN-106 Feed from AP-106 .
PC 1 Processes SY-101 Feed from AP-106
PC 1 Processes SY-103 Feed from AP-106
Modify AP-108 As Needed/Tie-in - PC 2
M-60-12 Start Hot Ops of LLW Pretreat Facility
PC 2 Processes AN-105 Feed from AP-108
PC 2 Processes AN-104 Feed from AP-108
PC 2 Processes AW-101 Feed from AP-108
PC 2 Processes AN-103 Feed from AP-108
PC 2 Processes AW-104 Feed from AP-108
PC 2 Processes AY-101 Feed from AP-108
PC 2 Processes AN-107 Feed from AP-108
Contractor #1 Process 7th Feed Batch
PC 2 Processes AN-102 Feed from AP-108
PC 2 Processes AN-106 Feed from AP-108
330.020
330.030
330.040
330.050
330.060
330.070
330.080
330.080
330.090
330.090
330.100
330.100
330.120
350.015
350.040
350.090
350.100 •
350.110
350.120
350.123
350.125
350.130
350.135
350.140
350.150
350.160
350.170
350.230
350.239
350.240
350.250
350.260
350.270
350.273
350.275
350.280
350.285
350.290
350.300
1138010311380103
11380103
11380103
11380103
11380103
11380104
11380105
11380104
11380105
11380104
11380105
11380104
11360101
11360102
11360103
11360103
11360103
-11360103
11360103
11360103
11360103
11360103
11360103
11360103
11360103
11360103
11360102
11360102
• 11360103
11360103
11360103
11360103
113'60103
11360103
11360103
11360103
11360103
11360103
2-28
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
350.310350.320
350.X05
360.020
360.040
360.080
360.090
360.100
360.110
360.120
360.130
360.140
360.150
360.160
360.170
360.180
360.190 '440.010
440.010
440.020
440.030
440.040
440.050
440.060
440.070
440.090
440.100
440.110
440.110
440.115
440.115A
440.115C
440.120
440.120
440.140
450.010
450.010D
450.030
460.005
1136010311360103
11310112
11360102
11360102
11360104
11360104
11360104
11360104
11360104
11360104
11360104
11360104
11360104
11360104
11360104
11360104
11340201
11340202
11340202
11340202
11340202
11340203
11340203
11340203
11340203
11340203
11340104
11340203
• 11340203
11340203
11340203
11340104
11340203
11340203
11340203
11340203
11340204
11340101
PC 2 Processes SY-101 Feed from AP-108PC 2 Processes SY-103 Feed from AP-108Transfer PC#1 & PC#2 Solids to AP-107Final Design HLW/LAW Immobilization FacilityTie-In Feed Line to Valve Pit Provided by W-211Phase IB' Proc/Immb First Batch HLW Feed-AZ-101Phase IB Proc/Immb Second Batch HLW Feed-AZ-101Phase IB Proc/Immob Third Batch HLW Feed-AZ-102Phase IB Proc/Immob Fourth Batch HLW Feed-AZ-102Phase IB Proc/Immb Fifth Batch HLW Feed-AZ-102Phase IB Proc/Immb Sixth Batch HLW Feed-AZ-102Phase IB Proc/Immb Seventh Batch HLW Feed-AY-102Phase IB Proc/Imrab Eighth Batch HLW Feed-AY-102Phase IB Proc/Immb Ninth Batch HLW Feed-AY-102Phase IB Proc/Immob Tenth Btch of HLW Feed C-104Phase IB Proc/Immob Eleventh Batch of HLW C-104Phase IB Proc/Immob Twelveth Batch of HLW C-104IHLW Interim Storage Administration/ManagementIHLW Interim Storage Administration/ManagementPrepare/Maintain ICDs (ID 13/14,17)Project Management PlansMaintain Technical Requirements (DRD)IHLW Storage Conceptual Design (W-464)
. Advanced Conceptual Design (W-464)Project Validation (W-464)Procure Equipment (W-464)Design IHLW Storage Facility (W-464)Prepare NEPA Documentation (W-464)Prepare NEPA Documentation (W-464)Prepare RCRA Permits (W-464)M-20-56 Submit Canister Fac Part B Permit AppM-90-12: Sub Revised CS Facility Part A PermitAuthorization Basis Development & Appr (W-464)Authorization Basis Development & Appr (W-464)Modify/Construct System (W-464)Prep OTPs/Conduct Readiness Assessmnt (Phase I)M-90-11: Complete Startup-Phase I-HLWISF (CSB)Transport/Receive/Interim Store IHLW (Phase I)ILAW Disposal Administration/Management
2-29
HNF-1946Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
460.005
460.005A
460.015
460.015
460.030
460.035
460.035A
460.040
460.040E
460.045
460.060
460.065
460.065K
460.070
460.070H
460.075
460.075
460.080
460.080D
460.085460.095
460.105
460.105H
460.110
460.112
460.115
460.1151
460:120
460.120C460.125
460.125A
460.130
460.140
460.145
460.145'
460.145
460.155
460.155A
460.160
11340102
11340203
11340102
11340104
11340102
11340102
11340102
11340104
11340104
11340104
11340104
11340104
11340104
11340104
11340104
11340102
11340104
11340104
11340104
11340104
11340102
11340106
11340106
1134010611340106
11340106
1134010611340106
11340106
' 11340106
11340106
11340106
1134013E
1134013B
1134013E
1134013M
1134013E
11340103
11340105
ILAW Disposal Administration/ManagementIss Ltr Rpt on SE Eval Processes DNFSB 92-4 #2Maintain ICDsMaintain ICDsMaintain Technical Requirements (DRD)Project Management PlanM-90-01 Submit Project Management Plans to EcolILAW Storage Conceptual Design (W-465)M-90-02-T01: Comp Conceptual Design-ILAW ISFILAW Storage Ady Conceptual Design (W-465)Project Validation (W-465)ILAW Storage Detailed Design (W-465)M-90-02-T01: Complete Detailed Design-ILAW ISFModify Vaults (W-465)M-90-03: CD 3-Initiate Construction - ILAW ISFPrepare NEPA Documentation (W-465)Prepare NEPA Documentation (W-465)Prepare RCRA Permits (W-465)M-20-57: Sub ILAW Part B Permit App to EcologyAuthorization Basis Development & Appr (W-465)Prepare/Maintain DRD - Disposal FacilitiesConceptual Design - Disposal Facilities (W-520)M-90-07-T01: Comp Conceptual Dsn-ILAW Add'l S&DAdvanced Conceptual Dsn - Disposal Fac (W-520)Validate Project (W-520).Design Disposal Facilities (W-520)M-90-09-T01: Comp Detailed Dsn-ILAW Add'l S&DConstruct Disposal Facilities (W-520)M-90-08: CD 3-Init Construction-ILAW Add'l S&DRegulatory Requirements for Disposal FacilitiesM-20-58 Submit LAW Facility Part B PermitAuthorization Basis Development and Approval1998 Performance AssessmentData Collection for 2001 Performance AssessmentData Collection for 2001 Performance AssessmentData Collection for 2001 Performance Assessment2001 Performance AssessmentInterface to H101020 (PMBS 400.020)Data Collection for Performance Assessment
2-30
HNF-1946 Rev. 0Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure
Level 1 Logic Level 6 WBS Description
460.170
460.170F
470.010
470.010
470.040
470.040A
470.060
470.069A
470.075
470.080
490.090
620.015
620.020
620.030
620.050
620.055
620.060
620.070
620.090
620.095
620.097
11340105
11340105
11340104
11340105
11340105
11340105
11340105
11340105
11340105
11340107
11340202
11310102
11310102
11310113
11310113
11310102
11310102
11310102
11310102
11310101
11310101
Maintain ILAW Phase I Performance Assessment
M-90-05-T01: Submit ILAW Disp Fac PA To Ecology
Procedures/Training/OTP/ORR (Initial Phase I)
Procedures/Training/OTP/ORR (Initial Phase I)
Interim Store ILAW Operations (Initial Phase I)
M-90-06: Initiate Hot Ops - ILAW Grout Vaults
Procedures/Training/OTP/ORR (Balance Phase I)
M-90-10 Initiate Hot Ops of ILAW Disposal Fac
Dispose ILAW Operations (Balance Phase I)
Close ILAW Disposal Facilities
Negotiate RW Requirements
Develop Waste Feed Delivery Safety Basis DQO
Maintain Waste Feed Delivery System Summary
Perform Feed Delivery USQ Process for HLW/LLW
Develop Waste Feed Delivery Licensing Strategy
Develop Waste Feed Delivery Permitting DQO
Eval Envmmntl Baseline HLW/LLW Feed Delivery
Update Environmental Baseline
Maintain Environmtl Baseline for Phase I Ext Ops
Dev/Iss Draft WFD Tech Baseline Summary
Update WFD Technical Baseline Summary
.2-31
HNF-1946 Rev. 0
Table 1 Crosswalk from the Level 1 Logic to the Work Breakdown Structure Level 6List of Terms
CDR Conceptual Design ReportCSB Canister Storage BuildingDNFSB Defense Nuclear Facilities Safety BoardDOE-RL U. S. Department of Energy, Richland Operations OfficeDQO Data Quality Objective • • •DRD design requirement documentDST double-shell tankEIS Environmental Impact StatementFDC Functional Design CriteriaFGWL flammable gas watch listICD interface control documentIHLW immobilized high-level wasteILAW immobilized low-activity wasteISF interim storage facilityISSTRS Initial Single-Shell Tank Retrieval SystemLAW low-activity wasteLLW low-level waste •LMHC Lockheed Martin Hanford CorporationNEPA National Environmental Policy Act of 1969,42 USC 4321, et seq.ORR operational readiness reviewOTP operational test planPA performance assessmentPC . private contractorPHMC . Project Hanford Management ContractRCRA Resource Conservation and Recovery Act of 1976, 42 USC 6901, et seq.ROD Record of DecisionS&D storage and disposalSST single-shell tankTCR Tank Characterization ReportUSQ unreviewed safety questionWFD waste feed delivery
2-32
HNF-1946 Rev. 0
Effluent Treatment Facility treatment of 242-A Evaporator condensatethrough FY 2032
- . Liquid Effluent Retention Facility treatment of radioactive or dangerousliquid effluents generated by private contractors through FY 2032
Treated Effluent Disposal Facility treatment of non-radioactive, non-dangerous liquid effluents generated by private contractors through
• FY2032. • .
Ongoing TWRS Safe Storage work scope for Tank Farm Operations (TW03),tank Waste Characterization (TW04), and Tank Safety Issue Resolution (TW02).The following work is funded elsewhere in the TWRS and is documented in theTWRS FY 1998 MYWP (Lenseigne 1997):
Operation and maintenance of the single-shell tank farms throughFY 2004 and the double-shell tank farms through FY 2005 including
. Environmental, Safety and Health training, maintenance, operations,surveillance and engineering
Tank Farm Upgrade Project W-314 after FY 2000 (Phase 2 of W-314)
Characterization work scope responding to Defense Nuclear FacilitiesSafety Board (DNFSB) 93-5, DNFSB Recommendation 93-5 to theSecretary of Energy Regarding Hanford Tank Sampling andCharacterization (DNFSB 1993) and Hanford Federal Facility Agreementand Consent Order (Tri-Party Agreement) (Ecology et al. 1996) M-44commitments; includes Characterization work scope through FY 2001
Waste Tank Safety work scope planned for resolution of unreviewedsafety questions (USQ) surrounding flammable gas and organics throughFY2001.
Management Support (TW10) to TWRS (excluding the allocated TWRS Retrievaland Disposal business volume share) for Environmental oversight, SystemsEngineering, reengineering, program integration, RL support, Quality Assurance,Safety and Health oversight, life-cycle cost estimating, Project HanfordManagement Contract fee, etc. This work is funded elsewhere in the TWRS andis documented in the TWRS FY 1998 MYWP (Lenseigne 1997).
Costs for operation of the private contractors' facilities and payment forimmobilized product produced. (Refer to the Privatization Phase 1 boxes inFigure 4, TWRS Retrieval and Disposal WBS.) This work is funded elsewhere inthe TWRS and is documented in the TWRS FY 1998 MYWP (Lenseigne 1997).
2-33
HNF-1946 Rev. 0
. The Privatization Regulatory Unit, which is separately funded by theU.S. Department of Energy outside of TWRS.
Phase 2 costs for the TWRS Retrieval and Disposal Program and privatecontractors' work. Refer to the gray shaded boxes in Figure 4, TWRS Retrievaland Disposal Work Breakdown Structure. This work is funded elsewhere in theTWRS and is documented in the TWRS FY 1998 MYWP (Lenseigne 1997).
2-34
HNF-1946 Rev. 0
3.0 SCHEDULE
The TWRS schedule has been updated to reflect changes that resulted from the RTPdevelopment phase. The schedule products are discussed in the following sections and areincluded as figures or tables in this section.
3.1 SUMMARY SCHEDULE
The TWRS Retrieval and Disposal Summary Schedule for the Phase IB mission isillustrated in Figure 6. The major programmatic start and end points to support the privatecontractors are depicted.
3.2 SITE MASTER BASELINE SCHEDULE
The Site Master Baseline Schedule is illustrated in Figure 7. This schedule is an initialupdate to reflect the integrated RTP planning effort for Phase IB of the TWRS Retrieval andDisposal Program. This schedule has been summarized from the lower level detail, includescritical path, and is traceable to the Program Logic (Figure 3).
3.3 PROJECT MASTER BASELINE SCHEDULE
The Project Master Baseline Schedule is illustrated in Figure 8. This schedule is aninitial update to reflect the integrated RTP planning effort for Phase IB of TWRS Retrieval andDisposal Program. This schedule has been summarized from the lower level detail, includeseach Level 1 Logic activity grouped by Level 6 WBS element, and shows critical path. Thisschedule is consistent with the Level 1 Logics and TBR packages and is supported by the lowerlevel logic network.
3.4 MILESTONE COMPARISON
Table 2 provides a comparison of RL, Headquarters, and Tri-Party Agreement milestonesbetween the baseline contained in the TWRS FY 1998 MYWP (Lenseigne 1997), the Tri-PartyAgreement, and the revised RTP planning for Phase IB of the TWRS Retrieval and DisposalProgram. . .
3-1
Figure 6. Summary Schedule.
Fiscal Year
Activity 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Waste Feed
Delivery
Immobilized
Low-Activity
Waste Disposal
Immobilized
High-Level
Waste Storage
Phase 1
Privatization
Phase 1
Infrastructure
Stage First Batch Phase 1 Feed ToPrivate Contractors
A
January 2002
Initiate ILAW Disposal Phase 1Operation
June 2002
Initiate Phase 1 fHLW StorageOperation
A
June 2002
Initiate Private Contractors Phase 1Immobilization of LAW and HLW
AJune 2002
Initiate Phase 11nfrastructureOperations
A
January 2002
Stage Last Batch Phase 1 Feed ToPrivate Contractors
October 2009
Complete Phase 11LAW Operation
September 2011
Complete Phase 11HLW StorageOperation
September 2011
Complete Private Contractors Phase 1Immobilization of LAW and HLW
September 2011
Complete Phase 11nfrastructureOperations
September 20111
IHLW = immobilized high-level wasteILAW = immobilized low-activity wasteHLW = high-level wasteLAW = low-level waste
HG97110249.100194S-6
Figure 7. Site Master Baseline Schedule (Sheet 1 of 2).
ActivityID
TJ5JT"
05B~
"05D~
—&5E~
OrigDur
EarlyStart
TWHSB
7CCtW"
EarlyFinish
•"2SDCTS5"
—WKUGSB—
t-V^U I HYOffTTYOrTFYOZ I FYQ3 I FY04 | FYOt> rFYD5/| FYU7 [ FYOB I T-YW \^20Da Ign/Con t/Tost New Equipment
I HY13 |
.H-43-03A Initiate Slicing Retrieval of C-106
2Z3SIuIce Sludge from C-108 to AY-102
CSSSZSSOesIgtVConstrucUTest Additional C-
151 Prepare for AZ-i101 MIxorPmpTest
EDW-151 Test AZ-101 Mixer Pump & Write Test Rpi
4M-43-1Z Start Const for Upgrade:
i.';-.-;^.y|W-3U AN Valve Pit Con:
GiElW-3i4AZ Farm Valto Pit
AM-43-14 Start Cortst for
In 1st Farm
ict/Startup
Ipgrade Design/Pro
Ipgrada In 3rd Fam
_i
i forRemaining Batches
from DSTs for Remaining Ba|i
alnlng HLW Batches for Prftroatflmmob
iPretreat & Stage HLW for Remaining Batches
T » •
•SHB~Project StirtPnjta FIniihOUt UNRun Oil*
TWRS Retrieval & Disposal
Readiness To Proceed
Site Master Baseline Schedule
Figure 7. Site Master Baseline Schedule (Sheet 2 of 2).
—47B—
STC—
—47D—
I
"06DECST"
TJTOCT58"
ISROTra* 233OKT02—
414' 20'0'East/West Design/Const
&W-314 200 East/West Deslgn/ConstfTest
4 AW Farm Upgrades Deslgn/Proc
1st for Upgrade In 4th Farm
rt Upgrades Const/Test
EEiW-3UAYFs»rmU|
AM-43-13 Start Const for Upgrade tn 2nd Farm
4AY Fa(m Upgrades ConstfTest
Operate Infrastructure Systjoms for Phase 1
tot OperaKons Phase f IHLWi
HBDestgnSConsjtiTost Infrastructure Project
ODesIgrVConsl
:velp Feed Delivery Safety Basis
i^DHl!>es[gnfConstruct Interim IHLW Storage Facility
KHMStar tup HLW Interim Storage Facility
X M - 9 0 - 1 1 Complete Startup HLWISF
ILAW Interim Storage/Disposal Fac
[Startup & Oberatlons Prep ILAW
^•H-90^6 Irfltlate Hot Operations ILAW
r 1st Tank of ISSTRS (SST Retrieval)
|PC:#1 Processes LAW Phase 1
#2 Processes LAW
|PC Processes HLW Phasi
'erform tjot Operations ILAW
Activity10
Early;start-
Earlyfinish
Develop LAW Confirm Tank T Meets Batch X DQO120 D07
Develop Waste Transf120 D08
Develop in Tank Proce120 D09
01OCT97 31MAR98
srtoPCDQO01OCT97 30JAN98
ssing Control DQO01OCT97
Evaluate AN-105 Samples for Adequate; 120.D10 01JUN98
20JAN98
/latts09JUL98
Develop DQO: PH1 Tank Waste Transfer Control120 011 01OCT97 31MAR98
Develop HLW Waste Delivery toPc DQO120.D12 01OCT97 01DEC97
Rvw AN-105 Historical Data/Conf jf Add'l Info Rq120 D15
Estab Dilution Reqmn120.D20
Characterize AN-T05120 D25
Update Best Basis Inv120 D30
01APR98
s/Diss Behav for/24JUN98
10JUL98
23JUN98
»f-10510MAR99
09DEC98
entoryand TCR for AN-10510DEC98 02FEB99
Pert Max Implied Radionuclide Concentrate Study120 D35 01OCT97
Confirm Plans and Requirements for AW120 D40 11MAR99
27FEB98
-10507MAY99
Do Envelopes Apply to Bulk Comp or Liquid Phase?120 D50 26MAY98*
Evaluate AN-104 samples for Adequate Mails120 EOS 01JUN98 09JUL98
Estab Dilution Reqmnts/Diss Befiav for AN-104::120.E10 24JUN98 21DEC98
iiReyieyaSNgiSWisKirigaMSrs: -1: 120.E15 01APR98 23JUN98
,,.. Fipure 8 Project Mft^rer Baseline Schedule in i • m u -i i - . i i m ,„ i i
Jevelop LAW Confirm Tank T Meets Batch X DQO
Jevelop Waste Transfer to PC DQO
)eveiop In Tank Processing Control DQO
Evaluate AN-105 Samples for Adequate Matls
Jevelop DQO: PH 1 Tank Waste Transfer Control
Jevelop HLW Waste Delivery toPC DQO
Rvw AN-105 Historical Data/Conf if Add'l Info Rq
Estab Dilution Reqmnts/Diss Behav for AN-105i >
Characterize AN-105C3
Update Best Basis Inventory and TCR for AN-105
3erf Max Implied Radionuclide Concentrate Study
Confirm Plans and Requirements for AN-105D
Do Envelopes Apply to Bulk Comp or Liquid Phase?
Evaluate AN-104 Samples for Adequate Mat|s
Estab Dilution Reqmnts/Diss Behav for AN-104
Review AN-104 Historical DataO
Activity, j , H>j Update Best Basis Inv
120 M25
Earlystart . ,
Early•finish
MitoryamlTCR for AN-10614MAY99 07JUL99
Confirm Plans and Requirements for AN-10S120 M35
Evaluate SY-f 01 Samp1120 R05
14MAY99 15JUL99
les for Adequate Matis01JUN98
Estab Dilution Reqmnts/Diss Behav for iJ120R10 24JUN98
09JUL98
5Y-10127AUG99
Review SY-101 Historical Data120 R15 01APR98 23JUN98
Characterize SY-101120.R20
Update Best Basis inv120 R25
10JUL98 21MAY99
entory and TCR for SY-10124MAY99
Confirm Plans and Requirements for SY120 R35
Evaluate SY-103 Samp120.T05
Estab Dilution Reqmn120.T10
Review SY-103 Histori1120 T15
30AUG99
les for Adequate f19MAY98
15JUL99
10127OCT99
rtatls22JUN98
s/Dlss Behav for SY-103 ,09JUN98 02DEC99
cat Data01APR98 08JUN98
Characterize SY-103120T20
Update Best Basis Inv120.T25
Confirm Plans and Re120T35
12AUG98*
entory and TCR ft26AUG99
25AUG99
r SY-10315OCT99
lUlrements for SY-10303DEC99
Obtain AP-101 Samples120.V05 01JUN98
Characterize AP-101120 V10 19APR99*
03FEBOO
09JUL98
13MAR00
Fipnm 8 Prnjent Master Baseline Schedule •' , , ,p^Tw^«ro?isfr?33rrwTs^^
Update Best Basis Inventory and TCR for AN-106
Confirm Plans and Requirements for AN-106
Evaluate SY:101 Samples for Adequate Matis
Estab Dilution Reqmnts/Diss Behav for SY-101
Review SY-101 Historical DataQ
Characterize SY-101
Update Best Basis Inventory and TCR for SY-101
• Confirm Plans and Requirements for SY-101
Evaluate SY-103 Samples for Adequate Matis
Estab Dilution Reqmnts/Diss Behav for SY-103
Review SY-103 Historical Datao
Characterize SY-103
Update Best Basis Inventory and TCR for SY-103
Confirm Plans and Requirements fqr SY-103
Obtain AP-101 Samples
Characterize AP-101
ActivityID
Early ;start
| Review AP-101 Historical Data120 V12
Eariyfinish
01APR98 I23JUN98
Establish Dilution Rqmts for AP-101 Process Test120 V14
Confirm Plans and Re120 V15
Update BBI&TCR ForI120V20
01SEP99* 19JAN00
:juirements for AP-10109MAY00 1OJUL0O
Tank AP-10114MAR00 02MAY00
Obtain AW-104 Samples ;120 W05 01JUN98 09JUL98
Characterize AW-1041120 W10 19APR99* 13MAR00
Review AW-104 Historical Data120.W12 01APR98 23JUN98
Establish Dirution Rqmts for AW-104 Process Test -1120 W14 01SEP99* 19JAN0O
Confirm Plans and Requirements for AW-104120 W15
Update BBI s TCR FotI120.W20
Phase! Tank Waste Tr130 010
O9MAY00 10JULOO
TanX AW-104 .14MAR00 02MAY00
ansfer Control01OCT97 30SEP11
ID Reqd Spares WFD 1st Batches LAW& LAW-130.B05 25JUN98*
Prepare for Sampling During LAW Feed130 B45 01OCTS7
compare RAM/o&M Conoeprw/ OTP Re130 B75 01OCT98
26FEB99
Staging05MAR01
UltS07OCT98
Assess Sec. Waste Util & Samp Anly Agnst Plans \I130.B80 01MAR01 07MAR01
Prep for Sampling During HLW Feed. Staging AZ-101130.N10 01OCT97 13MAR98
— figure 8 Project Master Baseline Schedule -™^~-~~~~™~™~~™.~~~~~~~~~ : _ . . . . - _ -
K'§8i WS91 i PirBBiPVbi \Pi&i j P?t% iPV<34) fVOS IWOS'f fy«B"|Pii& JRdS) A' i5 \Wi i i Wl2 | fYlS j WMi F¥<8 iVM |Pff f ' f '
Review AP-101 Historical Dataa
Establish Dilution Rqmts for AP-101 Process Test
Confirm Plans and Requirements for AP-101
Update BBI 8. TCR For Tank AP-101a
Obtain AW-104 SamplesB
Characterize AW-104 •
Review AW-104 Historical Data• • •
Establish Dilution Rqmts for AW-104 Process Test
Confirm Plans and Requirements for AW-104
Update BBI & TCR For Tank AW-104D
3hase I Tank Waste Transfer Control
ID Reqd Spares WFD 1st Batches LAWS LAW
'repare for Samplinq During LAW Feed Staqinq
Compare RAM/O&M Concept w/ OTP Results
Assess Sec. Waste Util & Samp Anly Agnst Plans
»rep for Sampling During HLW Feed Staging AZ-101
. Activity®
Earlystart
Earlyfinish '
Perform Feed Rate Trade StudyN150.BO4 01OCT97 2OJAN98
. Figure 8 Project Master Baseline Schedule
'erform Feed Rate Trade Study
Establish Feed R|ftSf;js?L Decision)1S0.B06 21JAN98 Establish Feed Rates (RL Decision)
Maintain WFD Char Matrices, Prob Speo DQOs150.B08 01OCT97 Maintain WFD Char Matrices, Prob Spec DQOs
Maintain Authorization Basis150.B17 Maintain Authorization Basis
Maintain Operations utilization Plan150.B22 01OCT97 Maintain Operations Utilization Plan
Maintain Operations Utilization Plan
Maintain Operations Utilization Plan
M*45-02D sub Annual SST Ret Seg Doc to Ecology150.B22A 30SEP98 M-45-02C Sub Annual SST Ret Seg Doc to Ecology
M-45-02C Sub Annual SST Ret Seg Doc to Ecology150.B22E 30SEP99 M-45-02D Sub Annual SST Ret Seg Doc to Ecology
Maintain [CDsMaintain ICDs
Perform Feed TanK Fill Status Trade Studypl50.B82 ' I01OCT97 I04MAR98 'erform Feed Tank Fill Status Trade Study
Establish Feed Tank FII Status (RL Decision)150.B84 05MAR98 Establish Feed Tank Fill Status (RL Decision)
Final ICD for Waste Feed Tank AP--106 - PC 1Final ICD for Waste Feed Tank AP-106- PC 1
Final (CD for LAW FeeFinal ICD for LAW Feed - PC 2
Final ICD for LAW Feed - PC 1150.B92 27MAY98 Final ICD for LAW Feed - PC 1
Finat ICD for HLW Feed (10 20)160.AOO 27MAY98* Final ICD for HLW Feed (ID 20)
j Activity Earlystart
Earlyfinish
Estab Tech (Process) Reqmnts-PhasefSldg Pret160.A12 01OCT97* 25NOV97
Assess Sec Waste, Util Samp Anly Agst Plan (HLW)160.A15
Prep DQO for Prlvatiz,160 A16
01OCT97 07OCT97
tion Char of Pot HLW Feed01OCT97
Compare RAM/O&M Conceptw/ OTP Re160.A17 05APR99*
Retr. Revise Pretreaf Rqmts (AZ-101/2 S160.A19
Finalize HLW Pretreat160.A20
16MARS9*
11NOV97
ulfs (HLW)09APR99
AY-102)11MAY99
RqmtS (AZ-101/2 & AY-102)28JUN99* 15NOV99
Determine Appropriate Alternative TanksI160A22 01OCT97
Update BB1 & TCR to Reflect Process T<160A25 18MAR99*
09JAN98
st AZ-10106MAY99
Develop Draft Sludge Wasti Temp Control Rqmts160 A41
Optimize PHI Feed SII160A43
Deter if Existing Data160.A44
21JAN98 29APR98
KfgeWash by Proc Simulation01OCT97 18FEB98
Meets DQO Needs - AZ-10112NOV97
Tatce Additional Grab Samples from AZ-11160 A46!Perf/Doc Smpl Atialys
J160A48
27JAN98
26JAN98
0124JUL98
s/SldgWashTest-AZ-10127FE898* 17MAR99
Verify that AZ-101 Is Acceptable for Feed to PCI160A50
Deter if Existing DataI160FOO
Obtain Core Smpls/Pr160F05
18MAR99 14MAY99
Meets DQO Needs - AZ-10212NOV97
>p Subsmpls/Com08JAN98
07JAN98
p for AZ-10214AUG98
istab Tech (Process) Reqmnts-Phase I Sldg Pret
Assess Sec Waste, Util Samp Anly Agst Plan (HLW)
3rep DQO for Privatization Char of Pot HLW Feed
Compare RAM/O&M Concept w/ OTP Results (HLW)
Retr. Revise Pretreat Rqmts (AZ-101/2 & AY-102)
Finalize HLW Pretreat Rqmts (AZ-101/2 & AY-102)
Determine Appropriate Alternative Tanks
Update BBI & TCR to Reflect Process Test AZ-101
Develop Draft Sludge Wash Temp Control Rqmts
Optimize PH1 Feed Sludge Wash by Proc Simulation
Deter if Existing Data Meets DQO Needs - AZ-101
Take Additional Grab Samples from AZ-101
Perf/Doc Smpl Analysis/Sldg Wash Test-AZ-101
Verify that AZ-101 is Acceptable for Feed to PC
Deter if Existing Data Meets DQO Needs - AZ-102
Obtain Core Smpls/Prep Subsmpls/Comp for AZ-102
ActivityI ID
Earlystart
Early-finish'
Perf/Doc Smpl Analysis/SldgWash Testing - AZ-1021160 F10 04DEC97* 17MAR99
update BBI and TCR for AZ-1021160 F12I
18MAR99* 06MAY99
Confirm that AZ-102 is Acceptable for Feed to PC1160 F15 18MAR99* 14MAY99
PC Conduct Waste Form Qual Conffrmation~AZ-1Q2
160.F80 17DEC02 27AUG03
Deter if Existing Data Meets DQO Needs -AY-102160 H00 27JAN98* 19MAR98
Obtn Core Smpfs/Prep Subsmpls/Comp for AY-102160 H05 20MAR98 12JAN00
Perf/Doc Smpl Analysis/Sldg Wash Testing-AY-102160 H20 13JAN00
Update BBI and TCR for AY-102160 H22
Deter if Existing Data160.J00
Obtain Core smpls/Pr160.J05
Perf/Doc Smpt Analys160.J10
Update BBI and TCR f160.J12
Confirm that C-104 is160.J15
PC Conduct Waste Fo160.J80
tp|$SSpMasB§**! |pIJ620.015
iMairitaiftWasteiFeedil620.020
02OCT00*
Vleets DQO Needs
27MAY98
27SEP00
20NOV00
-C-10417JUL98
p substnpls/comp for c-10420JUL98 26FEB99
s/SldgWash Testing C-10418JUN98* 29SEP99
r C-10401OCT99 19NOV99
\cceptablefor Feed to PC01OCT99 01DEC99
m qua! confirm -C-104/AZ-10104APR06 12DEC06
eifteiiJKSafetslSaSj!! DQ.601OCT97 31MAR98
eiB^ppleniiSummary01OCT97 30SEP11
~~~ Figure 8 Project Master Baseline Schedule
Perf/Doc Smpl Analysis/SldgWash Testing - AZ-102
Update BBI and TCR for AZ-102
Confirm that AZ-102 is Acceptable for Feed to PC
PC Conduct Waste Form Qual Confirmation-AZ-102
Deter if Existing Data Meets DQO Needs - AY-102
Obtn Core Smpls/Prep Subsmpls/Comp for AY-102
Perf/Doc Smpl Analysis/Sldg Wash Testing-AY-102
Update BBI and TCR for AY-102P
Deter If Existing Data Meets DQO Needs - C-104
Obtain Core Smpls/Prep Subsmpls/Comp for C-104i i
Perf/Doo Smpl Analysis/SldgWash Testing C-104
Update BBI and TCR for C-1040
Confirm that C-104 is Acceptable for Feed to PCa . •
PC Conduct Waste Form Qual Confirm -C-104/AZ-101
Develop Waste Feed Delivery Safety Basis DQO
Maintain Waste Feed Delivery System Summary
1 Activityj ID. t.i-rDevelop Waste Feed Delivery Permitting DQO
[620055 [01OCT97 I31MAR98
Eval Envmmntl Baseline HLW/LLW Feed Delivery620 060 I01OCT97 29JAN98
Update Environmental Baseline620 070
Maintain Environmtl B1620 090
02JAN98* 30SEP98
aseline for Pnase I Ext Ops01OCT98* 30SEP02
11310103 RETRIEVAL SYSTEMS BEF,Evaluate Equipment Rqmts in AY-101
[120 C25
Revise W-211 FDC for1120 E40
15APR02
AN--104
01OCT97
10JUN02
19FEB98
Decn Board/Acqn Strategy PHI Ret After AN-TQ4[120 G38
Adjust Acquistion Str<1120 G39
29OCT97
tegy W F D system01OCT97
Revise W-211 FDC for AW-101I120G40 04MAR98
Revise W-211 FDC for AN--fO3120J40 04MAR98
Revise W-211 FDCforAN-1071120 K40
I13MAY99
Approve FDC for Project W-TBD120 L36 13MAY99
03MAR98
30SEP05
20JUL98
20JUL98
29SEP99
19JUL99
Provide Documentation for W-TBD ValidationI (20 L37 13MAY99
Prep W-TBD Prj Definition/Tech Basis/Ft1120 L40
I241-AN-102 Upgrades1120 L41
01APR98
01FEB00
)C -12MAY99
Prep Tech Rqmnfs & CDR01OCT02" 22APR03
Develop Waste Feed Delivery Permitting DQO
Eval Envrnmntl Baseline HLW/LLW Feed Delivery
Update Environmental Baseline<~c—i
Maintain Envjronmtl BaseJine for Phase I Ext Ops .
Evaluate Equipment Rqmts in AY-101
Revise W-211 FDC for AN-104
Decn Board/Acqn Strategy PHI Ret After AN-104
Adjust Acquistion Strateqy WFD System
Revise W-211 FDC for AW-101
Revise W-211 FDC for AN-103
Revise W-211. FDC for AN-107
Approve FDC for Project W-TBD
Provide Documentation for W-TBD Validationi i
Prep W-TBD Prj Definition/Tech Basis/FDC
241-AN-102 Upgrades: Prep Tech Rqmnts & CDR .
Activitylt>
Earlystart
Earlyfinish
Z41-AN-106 Upgrades: PrepTech Rqmnts & CDR120 M40
Validate SY-102 Desig|120P32
Revise W-TBD Design120 R40
01OCT03* 21APR04
1 to DST Specification .29SEP99* 29NOV99
Specifications for SY-10103MAY01
j Revise W-f BD Design Specifications forM120T40 01OOT02*
18SEP01
SY-10319FEB03
Evaluate equipment Rqmts in AP-101120V25 14MAR00 08MAY00
j Evaluate Equipment Rqmts in AW-104120 W25 14MAR0O 08MAY00
Devel Tech Rqmts & CDR For Addl Eqpt in A2-1011160 A2S
Revise W-211 FDOfor160 F30
01OCT97 25AUG98
AZ-10204MAR98 20JUL98
Revise W-Z11 FDCforAY-102160.H17
issTRSPrj 1st Tank C1270 J99
28MAY98* 13OCT98
>104 S Retrieve to AN-10501OCT97
1131810S W-320 P1Q6 SLlilGINiGW-320 Project Management050 010
Design New Eqpmnt -050 020
01OCT97
22JUL05
_ _ _ _ _
28JAN00
W-320 Includes C106/AY«10201OCT97 26FEB98
Construct New Eqpmnt -W-320 Includes 0-106050 030
Construct/ATP Origin*050 040
Design/Equipment Su050 045
01OOT97 06MAY98
1 EquipmentforW-32001OCT97
sport for W-32001OOT97
19MAR98
30SEP98
241-AN-106 Upgrades- Prep Tech Rqmnts & CDR
Validate SY-102 Design to DST Specification
Revise W-TBD Design Specifications for SY-101CD
Revise W-TBD Design Specifications for SY-103
Evaluate Equipment Rqmts in AP-101
Evaluate Equipment Rqmts in AW-104
3evel Tech Rqmts & CDR For Addl Eqpt in AZ-101
Revise W-211 FDC for AZ-102
Revise W-211 FDC for AY-102D
SSTRS Pri 1st Tank C-104 & Retrieve to AN-105
A/-320 Project Management
design New Eqpmnt - W-320 Includes C-106/AY-102
Construct New Eqpmnt - W-320 Includes C-106
Construct/ATP Original Equipment for W-320
Design/Equipment Support for W-320
i ActivityID
Earlystart
Perform OTP for W-320050 050 01OCT97
Earlyfinish
19JUN98
Prepare Safety Doc Basis for Interim ops -w-320050 060 01OCT97
Prep/Conduct ORR/Receive Rl_ Approva050 070 01DEC97*
31DEC97
- W-32004SEP98
2M-45-03A InitiateSluicing Retrieval of C-10S050 079A 04SEP98
Action for DNFSB 93-5,5.4.3.6.C050 079B 04SEP98
Start Retrieval Secretary Sfty Initiative W-320050 079C
DQE-RLORRforW-32050.085
008SEP98
04SEP98
06OCT98
Sluic Sludge Into AY-102-W-320050 090 07OCT98 06OCT99
Design Additional Equipment W-320050 100 09DEC98 25MAR99
construct Additional Equipment W-320050 110 26MAR99 08DEC99
Test Additional EquipmentW-320050 120 09DEC99 13JAN00
Process Control Document-W-320050 130 01OCT97 30SEP99
Turnover Tank C-106 to HTl050.150 31JAN00 28JAN00
Prepare for ORRAZ-101120A88 08JUL99
Dsn/lnstall Central Control Room/Shift 0I120.B10 01APR98*
18NOV99
fc Facl28APR00
„ Figure 8 Project Master Baseline Schedule
'erform OTP for W-320
3repare Safety Doc Basis for Interim Ops - W-320
Prep/Conduct ORR/Receive RL Approval - W-320
2M-45-03A Initiate Sluicing Retrieval of C-106
Action for DNFSB 93-5, 5.4.3.6.C*
Start Retrieval Secretary Sfty Initiative W-320
DOE-RLORR for W-3201
Sluic Sludge Into AY-102 - W-320
Design Additional Equipment W-320
Construct Additional EquipmentW-320
Test Additional Equipment W-3200
Process Control Document - W-320
Turnover Tank C-106 to HTl
Prepare for ORRA2-101CD
Dsn/lnstall Central Control Room/Shift Ofc Facl
Activity Earlystart
Earlyfinish
Upgrade Waste Tank AY-10t as Required120 C30
Validate Project W-TB120 L38
12AUG04* 24MAR05
302FEB00 02MAY00
Define Project ManagementforW-TBD120 L39 03MAY00
241-AN-102 Upgrades: Design & Enviro.120.L50 02JAN98*
02MAY01
Permits29AUG03
241-AN-102 Upgrades; ConstfATP/Turnover/H14 Dwgs120 L55 21JUL03* 01OCT04
241-AN-102 Upgrades'. StartupWP/Ops Documents120 L60 04DEC03* 12JAN05
Prep for ORR for 241~AN-1O2120 L68
Contractor Independe1120 L70
04OCT04 03MAR05
ltORRfor24-f-AN-10201DEC04* 07APR05
DOEORRfor241-AN-102120 L75 08APR05
241-AN-106 Upgrades: Design & Enviro.120 M50 02JAN98*
241-AN-106 Upgrades: Const/ATP/Turno1120 M55 20JUL04*
241-AN-106 Upgrades: Startup;oTP/Ops120 M60 03DEC04*
07JUN05
Permits30AUG04
ver/H14Dwgs30SEP05
Documents11JAN06
Prep for ORR on Tank 241-AN-10S120.M68 03OCT05 02MAR06
contractor Independent ORR for 241 -AN-106120 M70
DOE ORR for 241 -AN-120.M75
30NOV05*
OS07APR06
Desfgn Upgrade W-TBD for SY-101120 R50 19SEP01
06APR06
06JUN06
25MAR03
~ ~ Figure 8 Project Master Baseline Schedule
Urarade Waste Tank AY-101 as Required
Validate Project W-TBDD
Define Project Management for W-TBD
241-AN-102 Upqrades: Desiqn & Enviro. Permits1 : '
241-AN-102 Upgrades: Const/ATP/Turnover/H14 Dwgs
241-AN-102 Upgrades: Startup/OTP/Ops Documents
Prep for ORR for 241-AN-102CD
Contractor Independent ORR for 241-AN-102
DOEORRfor241-AN-102
241-AN-106 Upgrades: Design & Enviro. Permits
241-AN-106 Upgrades: Const/ATP/Turnover/H14 Dwgs
241-AN-106 Upgrades: Startup/OTP/Ops Documents
Prep for ORR on Tank 241-AN-108CD
Contractor Independent ORR for 241 -AN-106' a
DOEORRfor241-AN-106O
Design Upgrade W-TBD for SY-101
Activity Earlystart
Earlyfinish
| Equipment Propureroentfor SY-1011120 R52 23JAN02
Construct/Test/Project Turnover of SY-11120 R55 26MAR03
19MAY03
J125FEB05
Startup for SY-101 (W-TBD) Mixing & Retr Sys1120 R60
I28FEB05 16DEC05
Prep for ORR on 241-SY-101120 R68 25MAR04 12JUL04
Contract Independent ORR on 241-SY-101120.R70 22AUG05 17OCT05
DOE ORR on 241-SY-101120R75
Oesign Upgrade W-TB120 T50
Equipment Procureme120 T52
18OOT05 16DEO05
D for SY-10320FEB03 19AUG04
nt W-TBD for SY-10319JUN03 14O0T04
Construct/TestfProject Turnover of SY-103120T55
startup for SY-103 (W120 T60
Prep for ORR on SY-1120T68
20AUG04 22FEB06
T,BD) Mixing & Retr Sys23FEB06 13DEC06
0322AUG05 07DEC05
Contractlndependent ORR on SY-103120T70 17AUG06
DOE ORR on SY-103120T75 13OCT06
12OOT06
13DEC06
Upgrade Waste Tank AP-101 as Required120V30 01OCT03* 11MAY04
Upgrade Waste Tank AW-104 as Required120W30 01OCT03* 12MAR04
Upgrd Valve Pits AW-A&B - W-454-Replace Jumpers130 B62 01OCT98* 27SEP00
Figure 8 Project Mater Baseline Schedule
Equipment Procurement for SY-101
Construot/Test/Proiect Turnover of SY-101
Startup for SY-101 (W-TBD) Mixing 8. Retr Sys
Prep for ORR on 241 -SY-101
Contract Independent ORR on 241-SY-101D
DOE ORRon241-SY-101D
Design Upgrade W-TBD for SY-103
Equipment Procurement W-TBD for SY-103
Construct/Test/Proiect Turnover of SY-103 •
Startup for SY-103 (W-TBD) Mixing & Retr Sys
Prep for ORR on SY-103a
Contract Independent ORR on SY-103D
DOE ORR on SY-103a
Upgrade W,aste Tank AP-101 as Required
Upgrade Waste Tank AW-104 as Required
Upgrd Valve Pits AW-A&B - W-454-Replace Jumpers
901-NV u^d |oj}uoo ssaoojj \ ipjeg 99a'OS I.
SUBJX daiisjoog
sjai.sue.ii deJisiooa
901-NVSEBSQ .O0030»0|
a|qBJ9do sAs QdM uiEjuiejsdO sXs aJM U!B>UIB|AI
Z61OOI.0I
(suoiiejado) dinbg ajeds Q j v \ ajnoojj OOMdVOI. ,861001.0
Bdn sXs Jajx 6uunQ uja;s^s Jajsuejj. ajseyv\ a ooNnros .Z633oi.o
afojd o) jaAoujnx JOJ f o 1-dV/ZO 1-dV a
oj jaAoujnx-ioJtCiP-dV/ZOV-dV
(;no lue ed JJX) aoejja)u|
apuad 0W09I.spuadapui JO;OEJ;UOO
66NVrZ0
aSpn|s JOJ p.bay dinbg pnjjsuoo
W1--2V-MSBM aBpnis Joj p.bay ;dbg ippv udjsapaa' 66JJVHU
Activity; ID
Earlystart
Earlyfinish
Prepare AN-103 Process Control Plan130J25 23DEC02*
Transfer Wst Id AN-103/Rec Feed In AP-1130 J30 01JUL03*
Transfer Wst in AN-103/Reo Feed in AP-1130J40 04AUG03*
11JUN04
0226NOV03
0405DEC03
Prepare AN-107 Process Control Plan130 K20 31MAR05*
Transfer Wst in AN-107/Rec Feed in AP-130 K30 01DEC05*
Transfer Wst In AN-107/Rec Feed in AP-130 K40 10FEB06*
07JUL0S
0211JAN06
0420MAR06
Prepare AN-tO2 Process Control Plan130.L20 26OCT05* 21NOV06
Transfer Wst in AN-102/Rec Feed in AP402j 130L30 03MAR06* 07APR06
Transfer Wst in AN-102/Ree Feed in AP-104130 L40 08MAY06* 15JUN06
Prepare AN-106 Process Control Plan130 M20 10MAR06* 18JUL07
Transfer Wst in AN-106/Rec Feetf in AP-102130 M30 28JUL06*
Transfer Wst in AN-106/Rec Feed in AP-'1130 M40 02OCT06*
Prepare Process Ctrl Plan AZ-101,130 N20
Btstrap Trans AZ-101130 N30
Mob/RetrWstinSY-10130 P50
16NOV99*
OAY-10130MAR00*
01SEP06
0406NOV06
09APR02
05MAY00
2/Rec Feed in AW-10503OCT05* 12JAN0S
Degas SY-101130 R10 03OCT05* 14FEB06
— Figure 8 Project Master Baseline Schedule „
Prepare AN-103 Process Control Plan
Transfer Wst in AN-103/Rec Feed in AP-102
Transfer Wst in AN-103/Rec Feed in AP-104
Prepare AN-107 Process Control Plan
Transfer Wst in AN-107/Rec Feed in AP-102a
Transfer Wst in AN-107/RecFeedinAP-104E
Prepare AN-102 Process Control Plan
Transfer Wst in AN-102/Rec Feed in AP-102E
Transfer Wst in AN-102/Reo Feed in AP-1043
Prepare AN-106 Process Control Plan
Transfer Wst in AN-1 OS/Reo Feed in AP-102D
Transfer Wst in AN-106/Rec Feed in AP-104a
Prepare Process Ctrl Plan AZ-101
Btstrap Trans AZ-101 to AY-101,
Mob/Retr Wst in SY-102/Rec Feed in AW-105a
Degas SY-101
Activity. . » .
Early•start
Earlysfiiilsh
Retrieve Waste in AP-101/Receive Feed tn AP-1041130 V20
PrepAP-101/AW-104E130V25
Retrieve Waste in AW-130 W10
Retrieve Waste in AW1130 W20
14APR04* 25MAY04
atoh Process control Plan02FEB04* 19APR05
f 04/Receive Feed in AP-10223APR04* 09JUN04
ibSReceive Feed in APS10428APR04* 09JUN04
Mix AN-105 Feed in AP-102150 B32 02JUL01* 12OCT01
Adjust AN-105 Feedln AP-102,150 B42
Deliver AN-105 Feed tt150.B44
TWRS EIS ROD Hold F150B46H
04JUN01* 09OCT01
AP-10604JAN02*
oint203JUN02*
11JAN02
31MAY02
Mix AN-105 Feed in AP-1041150 B48 02JUL01* 22OCT01
Adjust AN-105 Feed in AP-104150.B58
Deliver AN-105 Feed*1150 B60
TWRS EIS ROD Hold F150.B63H
04JUN01* 17OCT01
>AP-10»15JAN02* 23JAN02
oint-l16NOV98*
Execute Tank Turnover Procedure - PC 2150 B68
RL Declares AP-108 R150.B70
Execute Tank TurnoveI150B78
RL Declares AP-106R1150 B80
16NOV98
sady - contractor04JAN01*
r Procedure - PC 116NOV98
13NOV98
16NOV98
I02JUL01
16NOV98
eady-Contractor 104JAN01* 02JUL01
— Figure 8 Project Master Baseline Schedule ~——~- »™__ . — — ^ »„
Retrieve Waste in AP-101/Receive Feed in AP-1040
Prep AP-101/AW-104 Batch Process Control Plan' i
Retrieve Waste in AW-104/Receive Feed in AP-1020
Retrieve Waste in AW-104/Receive Feed in AP-104D
Mix AN-105 Feed in AP-102• a
Adjust AN-10S Feed in AP-102
Deliver AN-105 Feed to AP-1 OS1
TWRS EIS ROD Hold Point 2
Mix AN-105 Feed in AP-104a
Adjust AN-105 Feed in AP-104
Deliver AN-105 Feed to AP-108
TWRS EIS ROD Hold Point 1i
Execute Tank Turnover Procedure - PC 2i
RL Declares AP-108 Ready,- Contractor 2CD
Execute Tank Turnover Procedure - PC 1
RL Declares AP-106 Ready - Contractor 1
; , Activity Early ,,- start
Early-finish
Mix AY-101 Feed in AP-102j 150 C05 25APR05* 0SMAY05
Adjust AY-101 Feed fn AP-102150 C30
Deliver AY-101 Feed fr150.C35
23MAR05*
om AP-102 to AP-28DEC05*
03MAY05
0630DEC05
Mix AY-101 Feed in AP-1041150 C40 29APR05*
Adjust AY-101 Feed in AP-104150 C65 28MAR05*
06MAY05
03MAY05
Deliver AY-101 Feed from AP-104 to AP-108150.C70 02MAR06*
Mix AN-104 Feed in AP-1021150 EOS
Adjust AN-104 Feed In150 E30
02JAN02*
AP-10203DEC01*
Deliver AN-104 Feed from AP-102 to AP-150 E35
Mix AN-104 Feed In Af150 E40
Empty AP-107 Into ANI150E64
Adjust AN-104 Feed in150 E65
31DEC02*
M0402JAN02*
-104 for Vendor R01OCT01*
AP-10403DEC01*
10MAR06
01MAY02
2SAPR02
10608JAN03
10MAY02
turns17APR02
06MAY02
Deliver AN-104 Feed from AP-104 to AP-108150 E70
MIX AW-101 Feed in AI150G05
06JAN03*
P-10224MAR03*
Adjust AW-101 Feed in AP-102150 G30
Deliver AW-101 Feed fM50G35
03FEB03*
rom AP-102 to AP23SEPO3
13JAN03
30MAY03
27MAY03
1Q601OCT03
» Figure 8 Project Master Baseline Schedule • -
Mix AY-101 Feed in AP-102i
Adjust AY-101 Feed in AP-1020
Deliver AY-101 Feed from AP-102 to AP-106• i
Mix AY-101 Feed in AP-104i
Adjust AY-101 Feed in AP-104
Deliver AY-101 Feed from AP-104 to AP-108I
Mix AN-104 Feed in AP-102a •
Adjust AN-104 Feed in AP-102CD
Deliver AN-104 Feed from AP-102 to AP-106'
Mix AN-104 Feed in AP-104
Empty AP-107 Into AN-104 for Vendor Returnsnz>
Adjust AN-104 Feed in AP-104
Deliver AN-104 Feed from AP-104 to AP-108I
Mix AW-101 Feed in AP-102£3
Adjust AW-101 Feed in AP-102 '
Deliver AW-101 Feed from AP-102 to AP-106
Activity! '» ...
Earlystart
Earlyfinish
Mix AW-101 Feed in AP-104150 G40 01APR03*
Adjust AW-101 Feed in AP-104150G65
I03FEB03*
Deliver AW-101 Feed from AP-104 to API150.G70 29SEP03
Mix AN-103 Feed fn AP-102150 J05
Adjust AN-103 Feet) In1150 J30
Deliver AN-103 Feed ft150 J35
Mix AN-103 Feed in Af150 J40
01OCT03*
AP-10202SEP03*
10JUN03
05JUN03
10806OCT03
29DEC03
24DEC03
om AP-102 to AP-10628APR04 06MAY04
M0403NOV03* 13JAN04
Adjust AN-103 Feed In AP-10+150 J65 01OCT03* 08JAN04
Deliver AN-103 Feed from AP-104 to AP-108150.J70
Mix AN-107 Feed In AF150 K05
Adjust AN-107 Feed150 K30
03MAY04* 11MAY04
-10223MAY05* 01JUN05
25APR05* 27MAY05
Deliver AN-107 Feed from AP-102 to AP-106150K35 21FEB08* 01MAR06
Deliver AN-107 Feed from AP-102 to AP-106150 K37 22MAR06* 30MAR06
Deliver AN-107 Feed from AP-104 to AP-108150.K70
Deliver AN-107 Feed f1150 K72
01MAY06* 05MAY06
om AP-104 to AP-10830MAY06* 05JUN06
Mix AN-102 Feed Fn AP-102150 L05 03APR06 12MAY06
Fipnre R Prnjerf Mqqtw Rn^'ipo ^rh^dulp
Mix AW-101 Feed in AP-104iH
Adjust AW-101 Feed in AP-104ESS
Deliver AW-101 Feed from AP-104 to AP-108i • •
Mix AN-103 Feed in AP-102
Adjust AN-103 Feed in AP-102
Deliver AN-103 Feed from AP-102 to AP-106
Mix AN-103 Feed in AP-104S3
Adjust AN-103 Feed in AP-104ES
Deliver AN-103 Feed from AP-104 to AP-108i
Mix AN-107 Feed in AP-102i
Adjust AN-107 Feed
Deliver AN-107 Feed from AP-102 to AP-106
Deliver AN-107 Feed from AP-102 to AP-106I
Deliver AN-107 Feed from AP-104 to AP-108i
Deliver AN-107 Feed from AP-104 to AP-108i
Mix AN-102 Feed iri AP-102
| Activity1 «,; Earlystart
Earlyfinish
Adjust AN-102 Feed in AP-102150 L30
Deliver AN-1Q2 Feed fr150 L.35
Mix AN-102 Feed in AF150 L40
03APR06* 09MAY06
om AP-102 to AP-10607AUG06* 14AUG06
>-104
10JUL06*
Adjust AN-102 Feed In AP-104150 L65 09JUN06*
Deliver AN-102 Feed from AP-104 to AP-150 L70 12OCT06*
19JUL06
14JUL06
10820OCT06
Mix AN-106 Feed in AP-102150.M05 15SEP06* 06OOT08
Adjust AN-106 Feed in AP-102150 M30 18AUG06" 03OCT06
Deliver AN-10S Feed from AP-102 to AP-1Q6150 M35 03APR07* 11APR07
Mix AN-106 Feed in AP-104150 M40
Ad|ustAN-106Feedln150.M65
Deliver AN-106 Feed f150 M70
27NOV06* 11DEC06
AP-104 '24OCT06* 06DEC06
om AP-104 to AP-10811JUN07*
Mix SY-101 Feed in AP-1021150R05
Adjust SY-101 Feed in1150 R30
Deliver SY.101 Feedfr1150 R35
Mix SY-101 Feed in AF150.R40
Adjust SY-101 Feed In1150 R65
17MAY07*
AP-1Q2
16APR07*
15JUN07
05JUN07
31MAY07
om AP-102 to AP-10629OOT07* O2NOV07
-10423JUL07* 07AUG07
AP-10421JUN07* 02AUG07
„__ Figure 8 Project Master Baseline Schedule
Adjust AN-102 Feed in AP-102
Deliver AN-102 Feed from AP-102 to AP-1 OSI
Mix AN-102 Feed in AP-104I
Adjust AN-102 Feed in AP-104
Deliver AN-102 Feed from AP-104 to AP-108I
Mix AN-106 Feed in AP-102. 0
Adjust AN-106 Feed in AP-102
Deliver AN-106 Feed from AP-102 to APr106I
Mix AN-106 Feed in AP-1041
Adjust AN-106 Feed in AP-104D
Deliver AN-106 Feed from AP-104 to AP-108
Mix SY-101 Feed in AP-102i
Adjust SY-101 Feed in AP-102
Deliver SY-101 Feed from AP-102 to AP-106
Mix SY-101 Feed in AP-104
Adjust SY-101 Feed in AP-104
j Activity • i . Early; ID j ;s(art-
i Deliver SY-101 Feed from AP-104 to AP-1150 R70 02JAN08*
Mix SY-103 Feed irtAP-102J150T05 10DEC07*
Adjust SY-103 Feed in AP-102I150T30 08NOV07*
s ; Early" -finish0810JAN08
31DEC07
27DEC07
Deliver SY-1 OS Feed from AP-102 to AP-106150 T35 I28AUG08* 05SEP08
Mix SY-103 Feed in AP-104 '150T40 19FEB08* 03MAR08
Adjust SY-103 Feed In AP-104150 TS5 14JAN08* 27FEB08
deliver SY-103 Feed from AP-^04 to AP-108M50.T70 03NOV08* 11NOV08
Mix AP-101 Feed in AP-iOZI150V05 08JUL04* 26JUL04
AdjustAP-101 Feed in AP-102150.V30
Deliver AP-101 Feeds-150.V35
Mix AP-101 Feed in At150.V40
AdjustAP-101 Feed inI150.V65
Deliver AP-101 Feedfr150 V70
Pretreat AZ-101 (In-Ta160.A52
Pert Final Decant/Add160 A62
Mix Waste to Resuspe160 A64
28MAY04*
Ottt AP-102 to AP-11MAR05*
-10413JUL04*
AP-104-03JUN04*
19JUL04
0618MAR05
26JUL04
19JUL04
om AP-104 to AP-10816MAR05
Ik Sludge Washlm05OOT00*
Transfer Solution16APR01*
24MAR05
)18MAY01
-.AZ-10125MAY01
nd Solids for AZ-10129MAY01 17SEP01
Pigi,re S Pmjf i« Master Baseline Schedule • ,. •
Deliver SY-101 Feed from AP-104 to AP-108l
Mix SY-103 Feed in AP-1020
Adjust SY-103 Feed in AP-102 . .0
Deliver SY-103 Feed from AP-102 to AP-106I
Mix SY-103 Feed in AP-104l
Adjust SY-103 Feed in AP-104D
Deliver SY-103 Feed from AP-104 to AP-1081
Mix AP-101 Feed in AP-1020
AdjustAP-101 Feed in AP-102 . .
Deliver AP-101 Feed from AP-102 to AP-106i
Mix AP-101 Feed in AP-104
AdjustAP-101 Feed, in AP-104
Deliver AP-101 Feed from AP-104 to AP-108
Pretreat AZ-101 (In-Tank Sludge Washing)
Perf Final Decant/Add Transfer Solution - AZ-101a
Mix Waste to Resuspend Solids for AZ-101
Activity16
Earlystart
Deliver Second Batch of Feed from AZ-1160A72 18FEB03*
Deliver First Batch of Feed from AZ-101160A78 03DEC01*
Earlyfinish
J119FEB03
08MAR02
Pretreaf AZ-102 (In-Tarrt Sludge Washing)160.F65 26MAR02*
Pert Final Decant/Add Transfer Solution160.F70 04OCT02*
06NOV02
-AZ-10215NOV02
Mix Waste to Resuspend Solids for AZ-102160 F75 18NOV02 14MAR03
Deliver First Batch of Feed from AZ-102160.F95
Deliver Second Batch160 F99
Pretreat AY-102 (In-Ta160 H27
04AUG03* 10NOV03
of Feed from AZ-10230AUG04 31AUG04
nlc Sludge Washing)18JUN03* 29JAN04
Perf Final Decant/Add Transfer Solution-AY-102160.H45
Mix Waste to Resuspe160 H47
29DEC03* 06FEB04
nd solids for AY-10209FEB04 07JUN04
Deliver First Batch of Feed from AY-102I160.H75 07MAR05* 22JUN05
Deliver Second Batch of Feed from AY-1Q2160 H80
Deliver Third Batch of160 H8S
Deliver Fourth Batch c1160 H90
Deliver Fifth Batch of1160 H95
09JAN06 06JAN06
Feed from AY-10226JUL06 27JUL06
f Feed from AY-10212FEB07 12FEB07
Feed from AY-10230AUG07 31AUG07
Pretreat C-104/AZ-101 (In-TanR Sludge Washing)|160J65 15JUL05* 24FEB06
Figure s Prnjprf Master Paselinp Schedule
FYS§ 5-FV99 {Fy$) I YQ-1 ] FVtJ21 FY03 JFYQ4 j Fy$> [ FY0S f P/O? \ ^VoS Fyo9 ^ F^IQ J FY11 f { Y12 j FY13 | f-"YM i FY15 ) FY16 f HV17 1
Deliver Second Batch of Feed from AZ-101
Deliver First Batch of Feed from AZ-101a
Pretreat AZ-102 (In-Tank Sludge Washing)
Perf Final Decanf/Add Transfer Solution - AZ-1020
Mix Waste to Resuspend Solids for AZ-102
Deliver First Batch of Feed from AZ-102
Deliver Second Batch of Feed from AZ-102
Pretreat AY-102 (In-Tank Sludge Washing)
Perf Final Decant/Add Transfer Solution-AY-1020
Mix Waste to Resuspend Solids for AY-102D
Deliver First Batch of Feed from AY-102
Deliver Second Batch of Feed from AY-102
Deliver Third Batch of Feed from AY-102i . .
Deliver Fourth Batch of Feed from AY-102i
Deliver Fifth Batch of Feed from AY-102
. • Pretreat C-104/AZ-101 (In-Tank Sludge Washing)
Earlystart
Earlyfinish
| Analy AN-104 Smpfs/lnterpret Results from AP-102JJ150E20I
09MAY02* 01JUL02
Provide AN-104 Feed Batch info to PC 1I150.E25 02JUL02* 18JUL02
Obtain AN-104 Feed Qua! Samples from AP-104150.E45 24JAN02*
Provide AN-104 Samples from AP-104 to150 E50 20MAY02*
Analy AN-104Smpls/lnterpret Results frI150.E55 20MAY02"
17MAY02
PC 229MAY02
sm AP-10411JUL02
Prov AN-104 Feed Batch Info from AP-104 to PC 2J150E60 12JUL02* 26JUL02
Obtain AW-101 Feed Qaal Samples from AP-102I150.G10 27FEB03* 06JUN03
Provide AW-101 Samples from AP-102 to PC 1I150.G15 09JUN03*
Analy AW-101 Smpls/lnterpret Results ftI150.G20
Prov AW-101 FeedBaI150.G25
Obtain AW-101 Feed G|150.G45I
09JUN03*
Gh Info from AP-101AUG03*
17JUN03
om AP-10231JUL03
02 to PC 115AUG03
ual Samples from AP-10403MAR03* 01JUL03
Provide AW-101 Samples from AP-104 to PC 2I150.G50 02JUL03* 14JUL03
Analy AW-101 Smpls/lnterpret Results from AP-104I150.G55
Prov AW-101 FeedBaI150.G60
02JUL03* 22AUG03
ch info from AP-104 to PC 225AUG03 09SEP03
Obtain ANi103 Feed Qual Samples from AP-102150.J10 23SEP03"
Provide AN-103 Samples from AP-102 to1150 J15 07JAN04'
06JAN04
PC115JAN04
Analy AN-104 Smpls/lnterpret Results from AP-102
Provide AN-104 Feed Batch Info to PC 10
Obtain AN-104 Feed Qual Samples from AP-104a
Provide AN-104 Samples from AP-104 to PC 2
Analy AN-104 Smpls/lnterpret Results from AP-104
Prov AN-104 Feed Batch Info from AP-104 to PC 2i . . .
Obtain AW-101 Feed Qual Samples from AP-102m
Provide AW-101 Samples from AP-102 to PC 1
Analy AW-101 Smpls/lnterpret Results from AP-102• s
Prov AW-101 Feed Batch Info from AP-102 to PC 1
Obtain AW-101 Feed Qual Samples from AP-104
Provide AW-101 Samples from AP-104 to PC 2
Analy AW-101 Smpls/lnterpret Results from AP-104
Prov AW-101 Feed Batch Info from AP-104 to PC 2l
Obtain AN-103 Feed Qual Samples from AP-102
Provide AN-103 Samples from AP-102 to PC 1i
Analy AN-102 Smpls/lnterpret Results from AP-104
Provi AN-102 Feed Batch Info from AP-104 to PC 2I
Obtain AN-106 Feed Qual Samples from AP-102
] Activity| IB
Early, start
Earlyfinish
Analy SY-101 Smpls/toterpret Results from AP-104150 R55 21AUG07* 11OCT07
Prov SY-101 Feed Batch Info from AP-104 to PC 2150.R60 12OCT07 26OCT07
Obtain SY-103 Feed Qual Samples from AP-1021150 T10 30NOV07*
Provide SY-103 Samples from AP-102 to150 T15 14JAN08*
11JAN08
PC122JAN08
Analy SY-103 Smpls/lnterpret Results from AP-102I150.T20
IProv SY-103 Feed BahI150T25
Obtain SY-103 Feed Q150T45
Provide SY-103 Sampl1150 T50
14JAN08* 05MAR08
H info from AP-102 to PC 108MAR08 I20MAR08
Iual Samples from AP-10407FEB08*
es from AP-104 to18MAR08*
Analy SY-103 Smpls/lnterpret Results fr<|150.T55
Prov SY-103 Feed Baf.J150T60
Obtain AP-101.Feed Q150 V10
18MAR08*
17MAR08
PC 226MAR08
m AP-10408MAY08
~h Info from AP-104 to PC 209MAY08 23MAY08
ual Samples from AP-10202JUL04* 11AUG04
Provide AP-101 Samples from AP-102 to PC 11150 V15I 12AUG04*
Analy AP-101 Smpls/lnterpret Results fr11 SO V20
Provide AP-101 Feed EJ150V25
12AUG04*
20AUG04
3m AP-10213OCT04
atcb Info to pc 114OCT04 28OCT04
Obtain AP-101 Feed Qual Samples from AP-104I150V45 09JUL04* 16AUG04
Provide AP-101 Samples from Ap-104 to PC 2150V50 17AUG04* I25AUG04
~~-~ Figure 8 Project Master Baseline Schedule ^^^^ ,
Analy SY-101 Smpls/lnterpret Results from AP-104
Prov SY-101 Feed Batch Info from AP-104 to PC 2l
Obtain SY-103 Feed Qual Samples from AP-102
Provide SY-103 Samples from AP-102 to PC 1C
Analy SY-103 Smpls/lnterpret Results from AP-102
Prov SY-103 Feed Batch Info from AP-102 to PC 1
Obtain SY-103 Feed Qual Samples from AP-104
Provide SY-103 Samples from AP-104 to PC 2
Analy SY-103 Smpls/lnterpret Results from AP-104
Prov SY-103 Feed Batch Info from AP-104 to PC 2
Obtain AP-101 Feed Qual Samples from AP-102
Provide AP-101 Samples from AP-102 to PC 1
Analy AP-101 Smpls/lnterpret Results from AP-102
Provide AP-101 Feed Batch Info to PC 1
Obtain AP-101 Feed Qual Samples from AP-104
Provide AP-101 Samples from Ap-104 to PC 2
| Activity -' 10
Earlystart
j AnalyAP-101 Smpls/lnterpret Results frJJ150V55
Prov AP-101 Feed BatI150V60
17AUG04
h Into From Ap-119OCT04
Earlyfinish
m AP-10418OCT04
4 to PC 202NOV04
Obtain HLW Feed Qual Grab Samples AZ-101 Solids(160AS6
Eval Samples/EstablisI160A68
02APR01*
h MT for AZ-10111JUN01*
08JUN01
01AUG01
Provide Separate Samples to the PC - AZ-101I160A74
Prov MT Non-Volatile <J160.A76
Obtain HLW Feed Qua160.F50
11JUN01*
Oxides Exclude Na02AUG01
22JUN01
/Si-AZ-10116AUG01
Grab Samples AZ-102 Solids03SEP02* 02DEC02
Eval Smpls/Estab MToftNon-Volatile for AZ-102160 F55
Provide Separate Sam.1160 F85
Provide MT Non-Volat160 F90
Confirm thatXY-102 is160 H25
03DEC02* 27JAN03
pies to Private Contractor03DEC02* 16DEC02
Us oxides Excluding Na/Si28JAN03* 11FEB03
Acce'ptablefor Feed to PC02OCT00* 30NOV00
Obtarn HLW Feed Qual Grab Samples AY-102 Solids160 H50 01DEC03* 23FEB04
Eval Smpls/Estab MT of Non-Volatite for AY-102160 H55
PC Conduct Waste Fo160 H60
Provide MT Non-Volat160 H65
Provide Separate Sam160 H70
24FEB04* I15APR04
m Qual/Confirmation-AY-10209MAR04 12NOV04
leOxldes Excluding Na/Si16APR04
plestoPC-AY-1024FEB04*
30APR04
08MAR04
.. Figure K Prnjpr.t MflPfT RrisHine SrhPdllle ., i, -;
Analy AP-101 Smpls/lnterpret Results from AP-104
Prov AP-101 Feed Batch Info From Ap-104 to PC 2
Obtain HLW Feed Qual Grab Samples AZ-101 Solids
Eval Samples/Establish MT for A2-101D
Provide Separate Samples to the PC - AZ-101
Prov MT Non-Volatile Oxides Exclude Na/Si-AZ-1010
Obtain HLW Feed Qual Grab Samples AZ-102 Solids
Eval Smpls/Estab MTof Non-Volatile for AZ-102
Provide Separate Samples to Private Contractor
Provide MT Non-Volatile Oxides Excluding Na/Si,
Confirm that AY-102 is Acceptable for Feed to PC
Obtain HLW Feed Qual Grab Samples AY-102 SolidsD
Eval Smpls/Estab MT of Non-Volatile for AY-102
PC Conduct Waste Form Qual/Confirmation-AY-102
Provide MT Non-Volatile Oxides Excluding Na/Si
Provide Separate Samples to PC - AY-102
! Activity1 ID > •
; Early'• start , ,.
Earlyfinish
] Obtafn HIW Feed Qual Grab Samp C-104/AZ-101160 J50 24OCT05* 20MAR06
Eval smpls/Estab MT of Non-Volatile for c-104160 J55
ProvideSeparate SamJ160J85
21MAR06
ales to Private Co21MAR06"
Provide MT Non-Volatile Oxides ExcludIJ160J90 12MAY06*
11MAY06
itractor03APR06
ig Na/Sl26MAY06
11310126 W-34*PH 1KEST7SAFEQPS <L)Project W-314 (Phase I) Management250110
250110A
Project W-314 (Phase250 120
W-314 Master Pump S250.4A0
01OCT97
01OCT98
30SEP98
02OCT00
) Permits/Safety Analysis01OCT97
hut Dovm Upgrade01OCT97
29SEP00
26APR00
W-314 Upgrades to AN Farm250 4C0
| 250.4C0A
250 4C0B
01OOT97
11DECS7
25JUN98
W-314 AZ Farm Upgrades250.4D0 15APR98*
W-314 200 E/W Piping UpgradesI250.4E0 01OCT97
10DEC97
24JUN98
14AUG98
26JUL99
06DEC99
Prepare AW Farm for construction Actitiviesi 250.4E5 01APRS8* 01JUL98
| iVS|» iA«; |armi | lpa iaes l i l :I 25O.4F0
1 250.4F0A
1 M|i3M;Up;g|aa|s:5taiV1 250.4G0
25JUN98*
03NOV98
?iarrtfi:**iig:»*:**:02JAN98*
02NOV98
30JUN00
24JUN98
^ ^ Figure 8 Project Master Baseline Schedule _„„
Obtain HLWFeed Qual Grab Samp C-104/AZ-101
Eval Smpls/Estab MT of Non-Volatile for C-104
Provide Separate Samples to Private Contractor
Provide MT Non-Volatile Oxides Excluding Na/Si
'roiect W-314 (Phase I) Management
Proiect W-314 (Phase I) Management
'roiect W-314 (Phase I) Permits/Safety Analysis
/V-314 Master Pump Shut Down Upgrades
W-314 Upgrades to AN Farm
W-314 Upgrades to AN Farm
W-314 Upgrades to AN Farm
W-314 AZ Farm Upgrades
/V-314 200 E/W Piping Upgrades
Prepare AW Farm for Construction Actitivies
W-314 AW Farm Upgrades
W-314 AW Farm Upgrades
W-314 Upgrades to AY Farm
1
Activity :i It) :
j 250 4G0A
Earlystart
27OCT98
Earlyfinish
20SEP99
| Prepare AN Tank- Farm for W-314 Construction1250 C01 01OCT97
M-43-12 Start Constfar Upgrade in 1st II250T01 11DEC97*
06JAN98
arm
M-43-11 Provide W-314 Const Sched to Ecology1250 T011
M-43-13 Start Const for Upgrade in 2nd Jj 250T013 25JUN98*
30SEP98*
"arm
M-43-14 Start Const for Upgrade In 3rd Farm1250 TOM 27OCT98*
M-43-15 Start Const for Upgrade in 4th FarmJ250 T015 03NOV98* f
W-314 Complete Phase 1250 TA
I30JUN00*
j ProjectW-314 (Phase l> Implementation250 130 01OCT97 J29SEP00
W-151 Project Management110010
Apprd Safety Basis fo110 030
01OCT97
r Mixer Pump Pert01OCTS7
Conduct LMHC Readiness Assessment1110050 09MAR98*
30MAR99
arm Test23JAN98
29MAY98
DOB Approval to Operate110 060 01JUN98 29JUN98
Perform Mixer pump Test(VM5i)110.070 05JUN98 07AUG98
m i 0 " t t P - PROJECT SVt-ISlil'OT'AZJ'ROCESS'TESTRevisertss Mixer PumpTest Plans/Procedures110 045 26JAN98 16APR98
„ . Figure 8 Project Master Baseline Schedule -— ~ j ^ ^ - ^ — . „ „ „ ,™_^m_^^™, —_„„
W-314 Upgrades to AY Farm
3repare AN Tank Farm for W-314 Construction
M-43-12 Start Const for Upgrade in 1st Farm
M-43-11 Provide W-314 Const Sched to Ecology
M-43-13 Start Const for Upgrade in 2nd Farm
M-43-14 Start Const for Upgrade in 3rd Farm
M-43-15 Start Const for Upgrade in 4th Farm
W-314 Complete Phase 1
3roject W-314 (Phase I) Implementation
/V-151 Project Management
^pprd Safety Basis for Mixer Pump Perform Test
Conduct LMHC Readiness Assessment
DOE Approval to Operate
Perform Mixer Pump Test (W-151)
Revise/lss Mixer Pump Test Plans/Procedures
I Activity1 -ID
Early 'start
i Prepare Test Report (W-151)11110 090 I15JUL98
Early,,, Jirasfi
30SEP98
.nm-im wrtiwsnM. TKHR we SVOTDIS m>W-211 Startup AP-102/AP-104 Retrieval Systems120 B50 08NOV00 09MAY01
Prep for ORR on AP-102 S 104120 B58 13JAN00 25MAY00
Cohtract Independent ORR oft AP-102 & 104120.B60
OOE ORR on AP-102 8120 B65
W-211 Startup AN-105120 D80
10MAR00
10413MAR01
12MAR01
09MAY01
Retrieval System02OOT00
Prep ORR AN-105120.D88 13JAN00
Contract independent ORR ATM05120 D90 10MAR00*
DOE ORR AN-105J120.D95
W-211 Startup AN-104I120.E60IPrep for Readiness Rv
1120 E68
Contractor Independe120 E70
DOEORRfor241-AN-I120E75
W-211 Startup AZ-1021120 F60IPrepare for ORR AZ-K120 F68
01FEB01
02APR01
25MAY00
31JAN01
02APR01
Mixing & Retrieval System04APR01 J01OCT01
wor>24f-AN-10404OCT00 05FEB01
i t ORR for 241-AIM04D1DEC00 31JUL01
0401AUG01 ^SEPOI
Retrieval System28SEP01 01APR02
203APR01 31JUL01
.... I-igure 8 Project Master Rflseiinf^ Sr.hftHnle . : ..-
Prepare. Test Report (W-151)•
W-211 Startup AP-102/AP-104 Retrieval Systems
Prep for ORR on AP-102 & 104
Contract Independent ORR on AP-102 & 104
DOE ORR on AP-102 & 104o
W-211 Startup AN-105 Retrieval System .
Prep ORR AN-105a
Contract Independent ORR AN-105
DOE ORR AN-105D
W-211 Startup AN-104 Mixing & Retrieval System
Prep for Readiness Rvw on 241 -AN-104CD
Contractor Independent ORR for 241-AN-104i—i
DOE ORR for 241-AN-104a
W-211 Startup AZ-102 Retrieval System
Prepare for ORR AZ-102a
•
1 Activityi 10
Early
Contractor Independent ORR forAZ-4Q2I120F80 30MAY01
Earlyfinish
30JAN02
DOEORRforAZ-102120F90 31JAN02 01APR02
W-211 Startup AW-101 Retrieval SystemI120G60
Prep for ORR on AW-11120 G68
01JUL02
0102JAN02
31DEC02
30APR02
Contract Independent ORR on AW-101I120G70 28FEB02 28OCT02
DOE ORR on AW-101', 120.G75 29OCT02
W-211 Startup AY-102 Retrieval System120 H30 26DEC02
Contractor Independent ORRAY-102I120H50 23AUG02
DOE ORRAY-102120.H60
Prepare for ORR AY-1120 H68
24APR03
31DEC02
24JUN03
23APR03
23JUN03
26JUN02 24OCT02
W-211 Startup AN-103 Retrieval System120J60 02DEC02
Prep for ORR on 241-AN-103I 120 J68
Contractor Independe120 J70
03JUN02
1tORRfor241-AN31JUL02
30MAY03
01OCT02
-10301APR03
DOE ORR for241-AN-103120 J75
Opgrd W-211 OTP/Ops120.K60
Prep for ORR for 241-120K68
02APR03 30MAY03
Docmntn for AN-107 (Ops)01MAY03 31OCT03
^N-1D701NOV02 21FEB03
Mgure 8 Project Master Baseline Schedule -
Contractor Independent ORR for AZ-102
DOEORRforAZ-102
W-211 Startup AW-101 Retrieval System
Prep for ORR on AW-101
Contract Independent ORR on AW-101
DOE ORR on AW-101
W-211 Startup AY-102 Retrieval System
Contractor Independent ORR AY-102
DOE ORRAY-102o
Prepare for ORR AY-102a
W-211 Startup AN-103 Retrieval System
Prep for ORR on 241-AN-103
Contractor Independent ORR for 241-AN-103
DOEORRfor241-AN-103- o
Upard W-211 OTP/Ops Docmntn for AN-107 (Ops)
Prep for ORR for 241-AN-107
^ Activity(0
Contractor IndependeI120.K70
DOE ORR for 241-AN-J120K75
Contractor Independe1120 P22
Early,,s%t ....
-Early'finish
itQRRfor241-AN-10703JAN03 28AUG03
0729AUG03
it ORR for SY-10220JANOS
28OCT03
10MAR05
DOE Operational Readiness Reviewfor SY-1021120 P25 11MAR0S 09MAY05
W-211 Startup SY-102 Retrieval System120.P70 08JUN05* 08DEC05
Prep for ORR on 241-SY-102 Project W-211120 P90 30SEP04 19JAN0S
11318151.3W-211 INfmftL TA#K RET.SYSTEMS {LJ-W-211 Project Management120 A00 01OCT97 08DEC05
W.211 Design AP«102/AP«104 Retrieval SystemsI120.B35 09DEC97* 08DEC98
W-211 Equip Procure AP-102/AP-104 Retrieval Syst120.B42 01OCT97 I31MAR99
W-211 Construct AP-102/AP--104 Retrieval Systems120.B45 13JAN99
W-211 Equip ProcurementAN-105 Retrit120 D72
W-211 construction A120D7S
W-211 Design AN-104120 E50
W-211 Equip Procuren120.E52
02FEB98*
N-1 OS Retrieval Sy29MAR99
Retrlevaf System04MAR9S
entAN-104 Refrie07JUL9B
07NOV00
val System30JUL99
stem29SEP00
02SEP99
val System05JAN00
W-211 Construction AN-1Q4 Retrieval System1120 ESS 05OCT99 03APR01
. Fignrft 8 Project Mnstftr Raselinft Sr.herlnlft ; ,, .:
Contractor Independent ORR for 241-AN-107i i
DOEORRfor241-AN-107D
Contractor Independent ORR for SY-102
DOE Operational Readiness Reviewfor SY-1020
W-211 Startup SY-102 Retrieval System
Prep for ORR on 241-SY-102 Project W-211
/V-211 Project Manaqement
W-211 Design AP-102/AP-104 Retrieval Systems
A/-211 Equip Procure AP-102/AP-104 Retrieval Syst
W-211 Construct AP-102/AP-104 Retrieval Systems
W-211 Equip ProcurementAN-105 Retrieval System
W-211 Construction AN-105 Retrieval System
W-211 Design AN-104 Retrieval System
W-211 Equip Procurement AN-104 Retrieval System
W-211 Construction AN-104 Retrieval System
i ActivityID
Earlystart
Earlyfinish
W-211 Design AZ-102 Retrieval System120 F40 01SEP98* 29FEB00
W-211 Construction AZ-102 Retrieval System120 F50
W-211 Equip Procurer!120 F52
W-211 Design AW-lOf120 G50
03APR00 27SEP01
entAZ-102 Retrieval System04JAN99
Retrieval System01JUN99*
30JUN00
30NOV00
W-211 Equip Procurement AW-101 Retrieval System120 G52 01OCT99 30MAR01
w-211 Construction AW-101 Retrieval system1120 G55 02JAN01 28JUN02
W-211 Design AY-102 Retrieval System120 H10 29NOV99 23MAY01
W-211 Equip Procurement AY-102 Retrieval System1120 H15 24MAR00 24SEP01
W-211 Construction AY-102 Retrieval System1120 H20
W-211 Design AN-1031120 J50
W-211 Equip Proeuren120J52
26JUN01
Retrieval- System01NOV99*
23DEC02
30APR01
ientAN-103 Retrieval System01MAR00 30AUG01
W-211 Construction AN-103 Retrieval System 'I120.J55
W-211 Design AN-107120.K50
W-211 Equip Procuren1120 K52
W-211 Construction A1120 K55
W-211 Construction S'120 peo
01JUN01
Retrieval System03APR00*
ientAN-107Retrle01AUQ00
M-107 Retrieval Sy31OCT01
M 0 2 Retrieval Sy01OCT03*
27NOV02
27SEP01
val System31JAN02
stem30APR03
stem31MAR05
Figure 8 Project Master BasHm** Schedule
W-211 Design AZ-102 Retrieval System
W-211 Construction AZ-102 Retrieval System
W-211 Equip Procurement AZ-102 Retrieval System
W-211DesignAW-101 Retrieval System
W-211 Equip Procurement AW-101 Retrieval System
W-211 Construction AW-101 Retrieval System
W-211 Design AY-102 Retrieval System
W-211 Equip Procurement AY-102 Retrieval System
W-211 Construction AY-102 Retrieval System
W-211 Design AN-103 Retrieval System
W-211 Equip Procurement AN-103 Retrieval System
W-211 Construction AN-103 Retrieval System
W-211 Design AN-107 Retrieval System
W-211 Equip Procurement ANr107 Retrieval System
W-211 Construction AN-107 Retrieval System
W-211 Construction SY-102 Retrieval System
ActivityID
Earlystart
11340161:|LAW PROJECT ABMINiSTRAtlOKiILAW Disposal Administration/Management
![4BO005 |01OCT97 |27FEB98
MSO005B
LAW Disposal Administration/Management
ILAW Disposal Administration/Management
lss Ltr Rpt on SE Eval Processes DNFSB 92-4#2460.005A 27FEB98* Iss Ltr Rpt on SE Eval Processes DNFSB 92-4 #2
"Maintain ICDs010CW 30SEP10 Maintain ICDs
Maintain Technical Requirements (DRt>)460.030 01OCT97 Maintain Technical Requirements (DRD)
Project Management Plan460.035 31DEC97 >roject Management Plan
M-90-01 Submit Project Management Pians to Eco!I460.035A 31DEC97 M-90-01 Submit Project Management Plans to Ecol
Prepare NEPA Documentation (W-465)i 460.075 01OCT97 'repare NEPA Documentation (W-465)
Prepare/Maintain PRP - Pfeftpsal Facilities460.095 01OCT97 Srepare/Maintain DRD - Disposal Facilities
ILAW Storage Conceptual Design (W-465)460.040 01OCT97
460.040A
12DEC97 LAW Storage Conceptual Design (W-46S)
ILAW Storage Conceptual Design (W-485)
M-90-02-T01: Comp Conceptual Design-ILAW ISF-460.040E 15DEC97* M-90-02-T01: Comp Conceptual Design-ILAW ISF
ILAW Storage AdVConceptual Pesign (W-465)460.045 02JAN98* I30SEP99 ILAW Storage AoV Conceptual Design (W-465)
Project Validation (W-465)460.060 Project Validation (W-465)
ILAW Storage Detailed Design (W-»65)1460.065 01OCT99* ILAW Storage Detailed Design (W-465)
j Activityi tt»
Earlystart
Early •finish
1134020t IHLW PROJECT ABJjliNISTRATiON , ;j IHLW Interim Storage Administration/Management1440 010 01OCT97 30SEP11
11348202 iHfc.WSV&T6HJS £EFMTfONPrepare/Maintain ICDs (ID 13,14,17)440 020 01OCT97 23SEP11
Project Management Plans440 030
Maintain Technical Re440 040
Negotiate RW Require490 090
01OCT97 31DEC97
quirements (DRD)01OCT97 29SEP00
ments01OCT97 30SEP98
113*0203 PROJECT W-464 • ',IHLW Storage Conceptual Design (W-464)440 050 01OCT97
Advanced Conceptual Design (W-464)440.060
Project Validation (W-440 070
Procure Equipment (V440 090
01MAY98*
«64)01OCT97
M64)03MAY99*
30APR98
23SEP99
30SEP99
29SEP00
Design IHLW Storage Facility (W-464)440100
Prepare NEPA Docam:. 440 110
01OCT99*
entation (W-464)17MAR98*
Prepare RCRA Permits (W-464)440 115
440 115D
M-20-56 Submit Canis440 115A
01OCT97
11JUN99
29SEP00
02JUL01
10JUN99
29SEP00
erFac Part B Permit App
M-90-12: Sub Revised CS Facility PartA440 115C
29SEP00*
Permit10JUN99*
F la i l s 8 Proiect Master BT-clmr ^rhrr lnlr
HLW Interim Storage Administration/Managementi '
>repare/Maintam ICDs (ID 13,14,17)
'roject Management Plans
Maintain Technical Requirements (DRD)
Negotiate RW Requirements
HLW Storage Conceptual Design (W-464)
Advanced Conceptual Design (W-464)
'roiectValiclation (W-464)
Procure Equipment (W-464)
Design IHLW Storage Facility (W-464)
Prepare NEPA Documentation (W-464)
'repare RCRA Permits (W-464)
Prepare RCRA Permits (W-464)
M-20-56 Submit Canister Fac Part B Permit App
M-90-12: Sub Revised CS Facility Part A Permit
ActiyiryID
Earlystart
Earlyfinish
;^uthp|[Zg;jpnaBasjs;jOe^JQBrn|nt^;A;pr;r,j(y^6.4)i;||440J2b
Figure 8 Project Master Baseline Schedule |
^uthorizationBasisCievelopment & Appr (W-464)
Modlfy/Construc|§y|iMi(vi!§464):28SEP01 Modify/Construct System (W-464)
j Prep OTPsyCondiiiggjIinlss Assessmnt (Phase I): 450.010 :01OCT01* 31MAY02 Prep OTPs/Conduct Readiness Assessmnt (Phase I)
I M-90-11: Complete Startup-Phase I-HLWISF (CSB)31MAY02* M-90-11: Complete Startup-Phase I-HLW ISF (CSB)
11340204 IHLW OPERATIONS"Transport/Receive/Interim Store IHLW (Phase I)[450.030 IMJUNO? I30SEP11 Transport/Receive/lr^rimStorelHLW(Phasel)
\ DOE-R1, Private Contr $amp & Data RequirqentsDOE-RL Private Contr Samp & Data Requiments
contract and 1CDI27MA.Y98* Contract and ICD
1^60183 LAW Treatflrmnob/OeactPC 1 Processes AN-105 Feed from AP-106350.090 I03JUN02 08JAN03 PC 1 Processes AN-105 Feed from AP-106
PC 1 Processes AN-104 Feed from AP-106i|350J05" ' " |09JAN03 |01OCT03 PC 1 Processes AN-104 Feed from AP-106
PC 1 Processes AW-lOt Feed from AP-106350.110|350T 02OCT03 PC 1 Processes AW-101 Feed from AP-106
PC 1 Processes AN-103 Feed from AP-106' PC 1 Processes AN-103 Feed from AP-106
PC 1 Processes AP-101 Feed from AP-106350.123 21MAR05 I30DEC05 PC1 Processes AP-101 Feed from AP-106
PC 1 Processes AY-101 Feed from AP-106350.125' 03JAN06 I01MAR06 • PC1 Processes AY-101 Feed from AP-106
PC 1 Processes AN-107 Feed from AP-106350.130 02MAR06 PC 1 Processes AN-107 Feed from AP-106
Activity Early- -s<a«
Earlylinish
Contract #1 Process 7th Feed Batch350.135 31MAR06
! Figure 8 Project Master Baseline Schedule T
Contract #1 Process 7th Feed Batch
PC 1 Processes AN-102 Feed from AP-106350.140. 15AUG06 11APR07 PC 1 Processes AN-102 Feed from AP-106
PC 1 Processes AN-106 Feed from AP-1063507150 ""12APR07 PC 1 Processes AN-106 Feed from AP-106
PC 1 Processes SY-101 Feed from AP-1061350.160 ~ I05NOV07 I05SEP08
LPC 1 Processes SY-101 Feed from AP-106
PC1 Processes SY-103 Feed from AP-106350.170 I08SEP08 PC 1 Processes SY-103 Feed from AP-106
PC 2 Processes AN-105 Feed from AP-108PC 2 Processes AN-105 Feed from AP-108
PC 2 Processes A1M-104 Feed from AP-108PC 2 Processes AN-104 Feed from AP-108
PC 2 Processes AtAMOf Feed from AP-108350.260 07OCT03 PC 2 Processes AW-101 Feed from AP-108
PC 2 Processes AN-103 Feed from AP-108350.270 12MAY04 PC 2 Processes AN-103 Feed from AP-108
PC 2 Processes AW-104 Feed from AP-108350.273 26MAR05 10MAR06 PC 2 Processes AW-104 Feed from AP-108
PC 2 Processes AY-101 Feed from AP-108PC 2 Processes AY-101 Feed from AP-108
PC 2 Processes AN-107 Feed from AP-108PC 2 Processes AN-107 Feed from AP-108
Contractor #1 Process 7th Feed Batch350.285 06JUN06 Contractor #1 Process 7th Feed Batch
PC 2 Processes AN-102 Feed from AP-108PC 2 Processes AN-102 Feed from AP-108
PC 2 Processes AN-106 Feed from AP-108350.300 18JUN07 PC 2 Processes AN-106 Feed from AP-108
PC 2 Processes SY-101 Feed from AP-108350.310 PC 2 Processes SY-101 Feed from AP-108.
ActivityID
Early | Earlystart I finish
11380102 PH-1INFR- SYSTEM DEFINITION| Ready PHMC Oper/Maint Doc-AP-108 Turnoverj 150 86S
Ready PHMC OperiMa150 B76
27MAY98* 13NOV98
nt Doc-AP-106 Turnover27MAY98*
Prep AP-106 for Turnover to Private Con150 B8S
Establish interface Re150B94
27MAY98
quints for TanltTu01OCT97
13NOV98
tractor09JUN98
mover23JAN98
Final ICD for Waste Feed Tank AP-108 - PC 2j 150 B96 27MAY98*
Prep AP-108 for Turnover to Private Con150 B98 27MAY98
Systems Definition330 020 01OCT97
«380io3iP«TiWS. psejid? w»sfc Document Revfsions/IC Drawings330 030 01OCT97
Compl Infrastructure Electrical Sys Con1330 040 01OCT97
26MAY98
tractor11JUN98
29SEP00
30SEP98
ractPKg17AUG98
Design/Consfruction/Starfup Electrical System330 050 01OCT98 31OCT00
Dsn/Construction Site sys for PC Construction '330 060 01OCT98 31DEC99
Osn/ConstructfS/up Water, Site, Uq Eff Systems330 070 01OCT98 I30MAR01
amani ?M w t t ma rsmsstism -,Wlaint/Op/Pravlde Vendor Utitsfor constr PC PHI330.080
Maint/Op/ProvVendor330.090
04JAN00
Oflls/Wst Dtsp S/U02JAN02
31DEC01
p PCPht31MAY02
. . . Hgure 8 Project Master Baseline Schedule
Ready PHMC Oper/Maint Doc-AP-108 Turnover
Ready PHMC Oper/Maint Doc-AP-106 Turnover
Prep AP-106 for Turnover to Private Contractor0
Establish Interface Reqmnts for Tank Turnover
Final ICD for Waste Feed Tank AP-108 - PC 2i
Prep AP-108 for Turnover to Private Contractor0
Systems Definition
C Document Revisions/) C Drawings
iompi Infrastructure Electrical Sys Contract Pkg
Design/Construction/Startup Electrical System
Dsn/Construction Site Sys for PC Construction
Dsn/Construct/S/up Water, Site, Liq Eff Systems
.Maint/Op/Provide Vendor UtilsforXonstr PC Phi
. Maint/Op/Prov Vendor Utils/Wst Disp S/up PC Phi
i Maint/Op/ProyVendor/Wst Disp Prodctn PC PhiMaint/Op/Prov VendorMtet Disp Prodctn PC Phi
Provide Vendor staff Training330.120 01JUN01" T31MAY02 Provide Vendor Staff Training
1998 Performance AssessmentR60140 15JAN99 998 Performance Assessment
Data Collection for 20GT Performance As460.145 Data Collection for 2001 Performance Assessment
2001 Performance Assessment2001 Performance Assessment
Interface to H101020 (PMBS 400.020)460.165A 02APR01* 30MAR01 Interface to H101020 (PMBS 400.020)
11360101:
PC Complete Phase tA Deitverabfes1350.015 PC Complete Phase 1A Deliverables
113S010Z!Modify AP-106 As NeededJTie-ln - PC 1
^50.040 17NOV98 Modify AP-106 As Needed/Tie-in - PC 1
Modify AP-108 As Needed/Tie-ln . pc 2p50 230 17NOV98 Modify AP-108 As Needed/Tie-in - PC 2
M-60-12 Start HotOps of LLW Pretreat Facility350.239 03JUN02* M-60-12 Start Hot Ops of LLW Pretreat Facility
Final Design HLW/LAW Immobilization Facility360.020 :inal Design HLW/LAW Immobilization Facility
Tie-in Feed Line to Valve Pit Provided 6yW-21l360.040 07MAY99 Tie-in Feed Line to Valve Pit Provided by W-211
Milestones Level 1-5 : RTP vs TPA vs MYWP Due Dates
WBS - ActivityLevel 6 ID Description
Milestone Milestone RTP TPANumber Type Dates Dates
11310106 05079A M-45-03A Initiate Sluicing Retrieval of C-106 T04-98-161 2 04-Sep-98 31-Oct-9711310106 05079B Action for DNFSB 93-5, 5.4.3.6.C T04-98-161 5 04-Sep-98 N/A11310106 05079C Start Retrieval Secretary Sfry Initiative W-320 T04-98-161 4 04-Sep-98 N/A11310102 15B22E1A M-45-02D Sub Annual SST Ret Seg Doc to Ecology T04-99-241 2 30-Sep-99 30-Sep-9911310102 15B22EA M-45-02C Sub Annual SST Ret Seg Doc to Ecology T04-98-241 2 30-Sep-98 30-Sep-9811310126.25T011 M-43-11 Provide W-314 Const Sched to Ecology T03-98-054 2 30-Sep-98 30-Sep-9811310126 25T012 M-43-12 Start Const for Upgrade in 1st Farm T03-99-055 2 ll-Dec-97 30-Jun-9911310126 25T013 M-43-13 Start Const for Upgrade in 2nd Farm T03-00-056 2 25-Jun-98 30-Jun-0011310126 25T014 M-43-14 Start Const for Upgrade in 3rd Farm . T03-01-057 2 27-Oct-98 3I-Mar-0111310126 25T015 M-43-15 Start Const for Upgrade in 4th Farm T03-02-058 2 03-Nov-98 31-Mar-0211360102 35239A M-60-12 Start Hot Ops of LLWPretreat Facility T06-02-131 2 03-Jun-02 31-Dec-0211340203 44115C1 M-90-12: Sub Revised CS Facility Part A Permit T09-99-100 2 10-Jun-99 30-Jun-9911340203 44115D9M M-20-56: Sub CSB Part B Application to Ecology T09-01-100 2 29-Sep-00 31-Dec-0011340203 45010D M-90-11: Complete Startup-Phase I-HLWISF (CSB) T09-03-003 2 31-May-02 31-Dec-0211340101 46005A7 Iss Ltr Rpt on SE Evai Processes DNFSB 92-4 #2 T09-98-101 4 . 27-Feb-98 N/A11340102 46035AM M-90-01: Sub Project Management Plan to Ecology . T09-98-100 2 31-Dec-97 31-Dec-9711340104 46040E M-90-02-T01: Comp Conceptual Design-ILAW ISF T09-98-022 3 15-Dec-97 15-Dec-9711340104 46065K M-90-04-T01: Complete Detailed Design-ILAW ISF T09-01-010 3 30-Mar-01 30-Jun-0111340104 46070H M-90-03: CD 3-Initiate Construction - ILAW ISF T09-00-003 2 29-Jun-01 30-Jun-0111340104 46080D8 M-20-57: Sub ILAW Part B Permit App to Ecology T09-01-021 2 . 17-Jan-00 31-Dec-0011340104 46105H M-90-07-T01: Comp Conceptual Dsn-ILAW Add'l S&T09-99-011 3 15-Dec-98 30-Jun-OO11340104 461151 M-90-09-T01: Comp Detailed Dsn-ILAW Add'l S&DT09-04-001 3 30-Sep-02 31-Mar-0311340104 46120C M-90-08: CD 3-Init Construction-ILAW Add'l S&D T09-05-005 2 0I-Apr-03 3O-Jun-O3
11340104 46125H M-20-58: Sub ILAW Disp Part B Permit App to Ecol T09-01-020 2 31-Mar-03 31-Dec-0311340105 46170F M-90-05-T01: Submit ILAWDisp Fac PA To EcologyT09-03-101 3 31-Jan-03 31-Dec-0111340105 47040A M-90-06: Initiate Hot Ops - ILAW Grout Vaults T09-02-002 2 Ol-Jul-02 31-Dec-0211340105 47069CM M-90-10: Initiate Hot Operations -ILAW Module 1 T09-06-100 2 02-Aug-05 31-Dec-OS
Milestone Type . .2 = Tri-Party Agreement Interim3 = Tri-Party Agreement Target • •4 = DOE-Headquarters5 = DOE-RL-
MYWPDetailDates
30-Sep-9830-Sep-9830-Sep-9830-Sep-9930-Sep-9830-Sep-9830-Jun-9930-Jun-OO31-Mar-0129-Mar-0203-Jun-02Ol-Jun-9929-Sep-00
31-May-02
N/A31-Dec-9715-Dec-9729-Jun-0129-Jun-0117-Jan-00
15-Dec-9830-Sep-0201-Apr-0331-Mar-0331-Jan-0304-Jun-02
02-Aug-05
no
HNF-1946 Rev. 0
Table 2 Milestone ComparisonList of Terms
CSB Canister Storage BuildingDNFSB Defense Nuclear Facilities Safety BoardHLW high-level wasteILAW immobilized low-activity wasteISF Interim Storage FacilityIXW low-level wasteMYWP Multi-Year Work PlanPA Performance AssessmentRTP Readiness-to-ProceedS&D Storage and DisposalSST single-shell tankTPA Tri-Party Agreement
3-53
HNF-1946Rev. 0
4.0 COST
The TWRS Retrieval and Disposal and other supporting TWRS estimates and costs havebeen updated to reflect the changes that resulted during the RTP development phase. The costproducts are discussed in the following sections and are included as tables in this section.
4.1 SUMMARY COST SPREADSHEET
The cost spreadsheet (Table 3) summarizes the preliminary TWRS dollars, by fiscal year(FY 1998 through FY 2011), necessary to perform the following activities:
• TWRS Retrieval and Disposal Program for Phase IB scope based on the revisedRTP planning
• TWRS Phase IB scope required to support the TWRS Retrieval and Disposalmission
Scope Transfer Shortfalls identified since submittal of the TWRS FY 1998MYWP for activities that are transitioned to TWRS Retrieval and Disposal fromelsewhere in TWRS.
A complete summary and analysis of TWRS Project costs, including those shown in thisdocument related to the Retrieval and Disposal Phase IB mission, are included in the FinancialAnalysis (Wells 1998).
4.2 DESCRIPTION OF THE TYPES OF COSTS
This section describes the types of costs which are included in the Initial UpdatedBaseline as shown on Table 3, Summary Cost Spreadsheet
The TWRS Retrieval and Disposal Program costs for Phase IB Logics are the estimatesfor Phase 1 work defined by the Level 1 Logics for Waste Feed Delivery (LAW and HLW),Privatization Infrastructure, and Immobilized Waste. Technical Basis Review packages.wereprepared to document these costs as part of the RTP process. The values include escalationthrough FY 2006 and are in constant year dollars (FY 2006) thereafter.
Other TWRS Retrieval and Disposal Program costs for Phase IB support scope (not inLogics) include estimates for Project Management and Administration, Feed Process System
4-1
Table 3 Summary Cost SpreadsheetWBSLVL6 "WBS TITLE
1&93 FLE At. XLSIPH1B BSLN)
PHASE IB LOGICS(RETRIEVAL
IMMOBrfANKWASTESTORAGi!
(SUBTOTAL
ESCAL'N THRU 2006 @ 2.7%
TOTAL BASELINE [ESCALATED]I
OTHER TWR PHASE IB SUPPORT SCOPE (Not
mYoid2j11310103
'"[11310109'T i l 3*10110"
FEEO PROC SYSTEMS DEF.RETRIEVAL SYSTEMS DgF.RETRIEVALOPS "ssffFUTURE DST RETREIVAL PRJ'S
M1310114 [PHI RETREIVALbPS(CHAR'ZN)D, 11350101 IwiT / MGMTSYS-PNNL"""
OTHER - ESCALATION
"1 ~ jsOBTOfAL OTHER SUPPORT "SUBTOTAL -P3 BASELINE
!3THER TWRS PHASE IB SUPPORT SCOPE•|ESH/GA(BUS.VOL.)•1 PERFORMANCE FEE (BUS. VOL.)ICHAR'ZN SUPPORT TO EVAPORATORICENTRAL INSTRUMENT CONTROL FACIL
•IMGMT SUPPT: PGM. PLANNING (6US VOL)•JM'GMYSUPPT: S.£./REENGR~G (BUS.VOL.;
1 SUBTOTAL-OTHER TWRS SUPPORT SCOPE
:
SUBTOTAL - PHASE IB BASELINE
TW04
TW09
nToqiW04
TW04TW04twO4"fW0"4TW04TW05
TW10TW10TW01TW03
TW10TW10
—
NCLUDEO IN "OTHER TWR PHASE 18 SCOPE (NO1
ETRIEVAL SCOPE TRANSFER SHORTFALLSiSST SUSTAINING OPERSJCHAR'ZN BASE LOAD SUPPT (ADS 1130){DST 8ASELINE OMISSIONCHAR'ZN SUSTAINS OPERS (GRA8 SAMPLESAFETY K B. SUSTAIN OPERS
LIQUIDEFFLUIENT PROCESSrNG(WST MGM
SU8TOTAL-INTERFACE DISCONNECTS|
TOTAL P3 3ASELINE
!
TW03TW01TW03TW01TW02
TW08
FY SBUNESC
—
72,126
86,776
86,776
i
7.299279
1.831400
"is"
7,800"
17.624
104,400
6005,200
800
2.300"600
12.000
116,400
N LOGIC)" £
(3.841)
(3,841)
112,559
FY 99UNESC
86.346
•"- 9.908
113.630
3.068
116.698
5,202685
1,74137246
T 2 0 T493
18.760
'135.458
5006.3001.300
600
2,200500
11.900
147.358
TARTING Ih
1.410
(5.056)
142.302
FY 00
72.687
32.067
124.744
6782T
„"!£"-
5,665974
r 880579"182"
—8143'910
17.533149,104
5007.4001.300
600
2.0005 'm
12,300
161,404
FY2006
(1.928)
2.832-
904
162,308
FY 01
49,307
51,954
114,964
9"S66~
124,530
5.618551829
5.3471.065'
- - - - -
1.79223.326
147,856
6009,400
• 1.300
2.400
ssr14.300
162,156
(59]17,551
2,650
20,142
182,298
FY 02
53,118
128.063
14,401
142,464
2,673508
ii"282~2.306
22.812165.2"76
600• 11.200
2.400600"
14,800
180.076
(7.0001(4271
7.2002.770
(5.752T
13,907
193,983
FY 01UNESC
«?,$«
63.133
146.837
- 20.923
167.760
4831,688_
1*642"154
""14.8804.635
" "" " 37.160"
204.920
70011.700
2.800,700
15,900
220.820
(7.000)
17.043
2.852
— 077258)
am216.457
t FY 04
46.678,
82,305
170.336
2W5"199,861
7.944488
1.7986,318"1,067"
13*082"5.385
36,450
236.311
80011.700
3,600800"
16.900,
253,211
(7.000)
16,970
2.938
(17.258)
(4.350)
248.861
FY OS
28.852
8"."i62"
78,203
16,033
•"" 94,236
5,682494
2,0996,292*
970"143
11.079"5.486
32,245126,481
1.400. 11.700
4.500J800
18.400
144,881
5.000
3.025
" (17.2587
7.664
152.545
FY 06
15,617
I " " 9,93V
66,572
15.814
82.386
4.878509
l~~~ ""67268
"ear
32^36"10,94156.997
V39.383
j _
139.383
5,000
10,000
4,7837
"" 2",525
141.906
FY 07UNESC
FY 08
1
7.796
9.912
58,897
*" 13.991
72.888
4,802485861
_ 7 _ 6 . 2 6 V
-32,62510,67655,617
128.505
.. . " _
:_„
6.041
9.833
57,063
1"37555"
70.618
4,706455860
6,4.02
-34.118
"1T.056"57.597
128.216
„.-;-
: _ _
•
128,505
5,000
10.000
"4.783
—(17.258)
2,52_5_
131,030
128.216
5,000
10,000.
4,783
07".2S8i
2 ^ _
130.741
FY 09
4,489
9-.74<f
55,424
68.590
4.642464"1862
""67250
— ^ ™
10.65955.531
124.122
: _
- . _
124.122
5.000
10.000
4.783
(17.258)
2.525
125,647
FY 10
__
4.314
Xi!"54.638
127979"
67 ,'617
FY 11UNESC
1.294
9,065
37.600
* ""8.932"
46,532
4,705 \ 3,886449 369836
67250
"337988"10,982
57,210"T24.828'
842S. ". 6.292'
32,655' "10.463
54.508101.040
— - _ .
— ^ _
124.828
5.000
10,000
4,783
(177258)
127.353
- - ; - -
101,040
5.000
10.000
4.783
(11.506)
8.277
109.317
TOTAL
491,180
""*" "346.417"
1,293,747
-""778778T
1,472.528
73.3867.194
17.23068,507
"6.234665
' ""284,371"* " " "85.783
543,371
2.015.900
5.70074.6003.9002.000
22.2005.100"
116.500
14.000"(12.721)145.577
7,20047,175
(155.322)
45,909
HNF-1946Rev.O
Definition, Retrieval System Definition, Retrieval Operations (Single-Shell Tank), FutureDouble-Shell Tank Retrieval Projects, Phase 1 Retrieval Operations (Characterization), and •Process Waste Support costs associated with Management and Integration Contractor VendorInterface and Phase 1 Program Management by the RL/Pacific Northwest National LaboratoryWaste Integration Team. These activities and costs are essential to the Retrieval and Disposal
' Program, but were not covered or. partially covered by activities in the Level 1 Logics. The costsused are from the TWRS FY 1998 MYWP (Lenseigne 1997) with escalation through FY 2006and constant year dollars (FY 2006) thereafter.
Other TWRS Phase IB Support Scope includes the costs for a pro-rata share of theTWRS cross-cutting activities and other miscellaneous activities (funded elsewhere in theTWRS) that are connected to and necessary to support the TWRS Retrieval and DisposalProgram as defined by the RTP assessment. Activities include Environmental, Safety andHealth/Quality Assurance management and oversight based on a business volume share;Performance Fee based on a business volume share; Characterization support to the evaporator;Central Instrument Control Facility; the Cross-Site Transfer Line; management support forprogram planning; and Systems Engineering and reengineefing, based on a business volumeshare. The cost numbers used are from the TWRS FY 1998 MYWP (Lenseigne 1997) withescalation through FY 2006 and constant year dollars (FY 2006) thereafter..
Scope Transfer Shortfalls are cost disconnects that have been identified during RTP andsince the development of the TWRS FY 1998 MYWP (Lenseigne 1997) for activities that will betransitioned to the TWRS Retrieval and Disposal Program. Although these activities are notspecific to the Phase 1 Level 1 Logics, additional resources are required to fund these activities.They include single-shell tank sustaining operation, Characterization base load support, double-shell tank baseline omission, Characterization sustaining operations, Safety Authorization Basis(AB) sustaining operations, and liquid effluent processing. Liquid effluent processing costs areincluded in the "Phase IB Logics" baseline and are deducted here as it has been determined thatthis work is funded by the Waste Management Program. These cost numbers include escalationthrough FY 2006 and constant year dollars (FY 2006) thereafter.
A detailed discussion and analysis of these costs are included in the Financial Analysis(Wells 1998). '. .
4.3 COST-LOADING REPORT
The cost-loading report (Table 4) summarizes the TWRS Retrieval and Disposal costs byfiscal year (FY 1998 through FY 2011) necessary to perform work defined by the Level 1 Logicsand the Project Master Baseline Schedule. The dollars are unescalated. These are the same costson Table 3 as "Phase IB Logics."
Table 4 provides a summary by Level 6 WBS element followed by the additional detailsof Level 1 Logic activities. Pricing of resources to generate these costs was done in the
4-5
HNF-1946 Rev. 0
Primavera Systems, Inc. scheduling software using input from the TBR packages' CEIS's andapproved labor rate tables.
4-6
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:30
RTP COST ($K) by WBS Level S
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
[ACCOUNT ACCOUNT TITLEFY
2007
.11310101 PROJECT MGT/ADMINISTRATION
11310102 FEED PROCESS SYSTEM DEF.
11310103 RETRIEVAL SYSTEMS DEF.
11310106 W-320 C-106 SLUICING
11310107 INITIALSST RETRIEVAL SYSTEM"
11310109 RETRIEVAL OPS (SST)
11310110 ' FUTURE DST RETRIEVAL PROJECTS
11310112 PH1 RETRIEVAL OPS {OST)
11310113 PH1 RETRIEVAL SAFETY BASIS
11310114 PH 1 RETR OPS (CHARACTERIZATION) .
11310126 W-314 PH 1 REST/SAFE OPS (L)
11310140 W-314 PH 1 REST/SAFE OPS (E)
1131014E PROJECT-W-151 101^iZ RETRIEVAL (L)
1131O14P PROJECTW-1S1 101-AZPROCESSTEST
113J0J5E W-211 INITIAL TANK RET SYSTEMS (EXPEN
1131015L W-211 INITIAL TANK RET SYS'<UNE ITEM)
11340101 ILAW PROJECT ADMINISTRATION
11340102 ILAW SYSTEMS DEFINITION
11340104 PROJECT W-465
11340105 ILAW OPERATIONS
11340)03 PROJECT W52O FUTURE FACILITIES
11340107 ILAW FACILITY CLOSURE AND D&D
1134013B Obtain Borehole #1 Samples (C)
1134013E ILAW PERFORMANCE ASSESSMENT (E)
1134013M X-Ray Microtomography Equip (C)
11340201 IHLW PROJECT ADMINISTRATION
11340202 IHLWSYSTEMSDEFINrriON
11340203 PROJECT W-464
11340204 IHLW OPERATIONS
11380101 PH-1INFR. PROJ. MGT/ADM.
11380102 PH-1 INFR. SYSTEM DEFINITION
11380103 PH-1 INFR. PROJECT W-519INFRASPRJ
11380104 PH-1 INFR: M&l OPERATIONS
11380105 PH-1 INFR. PC OPERATIONS
' REPORT TOTAL
37411726
2321
13947
1107
282783
23412
2312
3013881260
13912
8517521139
2194
1323531
1201706441469
3589782315
49013854
2561
5498
4404
1092
83527
22126
3191
311218
31020
7752091652
1109
1369
3476
107.
1491061
4641529
15383
1755698
6996885627
' 2490
3163
264
' 3900
6048
2168
41765
74938
6482
3287
1642
1270
104
se18407
37811
16453
753072
5432295
99
6758
2964723
5824
4417
29348
693
17686
4155
5660
405
13869
23148
419
4408764
4080
1082636
148
6731
6713
4673
1750
2976
27388
68997
13925
2812
9686
5
13868
1902
948212
17483
26984
1081978
478
6758
12929
.4270
1552
3806
10636
856
3447
. 55765
13861
2866
213
28740689
• 108
1410
425
5466
70317286
4689
2476
1542
12572
860
3906
74461
13961
2877
214
28840851
1081410
45
2900
11166
4027
1429
1920
5849
856
4241
13861
2866
213
28740689
1081335
4454
.6426
1633
5711093
" 853
6025
13860
28551 212
28640526
1081335
54548
1802
856
5991
13861
2866
213
28740689
1081362
3632
941
856
5310
602
13861
2866
213
28740689
1081317
3063
856297
4015
1513
13861
2866
213
28740689
1081223
2983
856297
4015
902
13861
2866
213
28740689
108.1185
856
4015
229902
13859
2866
141
1S026910
86777 113628 124741 114965 128071 146838 170334 . 78204 66575 58898 57065 55423 54637
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST ($KJ by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
JACCOUNT ACCOUNTTITLEFY
2008
11310101 PROJECT MGTVADMINISTRATION
130.B65 TWRS Management Assessment (LAW)
13O.B70 Prepare Plan/Document for Mgmt Assessment {LAW)
160.A13 Prepare Plan/Document for Mgml Assessment (HLW)
160.A18 ' TWRS Management Assessment (HLW)
620.095 " Dev/Iss Draft WFD Tech Baseline Summary
620.097 Update WFD Technical Baseline Summary
TOTAL 11310101
29579
65369
108
108
11310102 FEED PROCESS SYSTEM DEF.
110.047 Perf Mixer Pump Test Samplings Analysis
120.C05 Obtain AY-101 Samples
120.C10 Characterize AY-101
120.C12 Review AY-101 Historical Data
120.C14 Establish Dilution Rqmts for AY-101 Process Test
120.C15 Confirm Plans and Requirements for AY-101
120.C20 Update BBI & TCR ForTankAY-101
120.D07 Develop LAW Confirm Tank T Meets Batch X DQO
120.D0S Develop Waste Transfer to PC DQO
120.D09 Develop In Tank Processing Control DQO
120.D10 Evaluate AN-1 OS Samples for Adequate Matls
120.D11 Develop DQO: PH1 Tank WasteTransfer Control
120.D12 Develop HLWWasta Delivery toPC DQO
120.D15 Rvw AN-105 Historical Data/Conf if Adtfl Info Rq
120.D20 Estab Dilution Reqmnts/Diss Behavfor AN-105
120.D25 Characterize AN-105
120.D30 Update Best Basis Inventory and TCR for AN-105
120.D35 Perf Max Implied Radionuctide Concentrate Study
120.D40 Confirm Plans and Requirements for AN-105
120.E05 Evaluate AN-104 Samples for Adequate MaUs
120.E10' Estab Dilution Reqmnls/Diss Behav for AN-104
120.E15 Review AN-104 Historical Data .
120.E20 Characterize AN-104
120.E25 Update Best Basis Inventory and TCR for AN-104
120.E35 Confirm Plans and Requirements for AN-104
120.G05 Evaluate AW-101 Samples Adequate Matls
10241512
402
592426
32353210321742138
"83
62
111314283
107
48
27
25
41
482725
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST ($K) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP17DEC97
DATA DATE 01OCT97
jACCOUNT ACCOUNT TITLE 2000 2001 2002 2003 2004 2005 2006 2007 200{120.G1S Review AW-101 Historical Data
120.G20 Characterize AW-101
120.G2S Update Best Basis Inventory and TCR for AW-101
120.G35 Confirm Plans and Requirements for AW-101
. 120.G37 Eval Waste Retrieval Equip Req'd forTanks5On
120.J0S Evaluate AN-103 Samples for Adequate Mads
120.J10 EsUb Dilution Roqmnts/Diss Behavior AN-103
. 120.J15 Review AN-103 Historical Data
120.J20 ' Characterize AN-103
120.J25 Update Best Basis Inventory and TCR forAN-103
120.J35 ' Confirm Plans and Requirements forAN-103
120.K05 Evaluate AN-107 Samples for Adequate Matls
120.K10 Estab Dilution Reqmnts/Diss Behav for AN-107
120.K15 Review AN-107 Historical Data
120.K20 Characterize AN-107
120.K25 . Update Best Basis Inventory and TCR for AN-107
120.K35 Confirm Plans and Requirements for AN-107
120.105 Evaluate AN-102 Samples for Adequate Matls
120.L10 Estab Dilution Reqmnts/Diss Behav for AN-102
120.L15 Review AN-102 Historical Data
120.L20 Characterize AN-102
120.L25 Update Best Basis Inventory andTCRfor AN-102
120.L35 Confirm Plans and Requirements for AN-102
120.M05 Evaluate AN-106 Samples for Adequate Matls
120.M10 Estab Dilution Roqmnts/Diss Behav for AN-106
120.M15 Review AN-106 Historical Data
120.M20 Characterize AN-106
120.M25 Update Best Basis Inventory and TCR for AN-106
120.M35 Confirm Plans and Requirements for AN-106
120sR0S Evaluate SY-101 Samples for Adequate Matls
120.R10 Estab Dilution Reqmnts/Diss BehavforSY-101
120.R15 ReviewSY-101 Historical Data
120.R2Q CharacterizeSY-101
120.R25 Update Best Basis Inventory and TCR for SY-101
120.R3S Confirm Plans and Requirements for SY-101
120.T05 Evaluate SY-103 Samples for Adequate Matls
120.T10 Estab Dilution Reqmnts/Diss Behav for SY-103
120.T15 ReviewSY-103 Historical Data
42S3 .
27111424283
11121725
117417443
11124225
114042340
114034
.482725
• 152
4827•25
61
4132725
12725
61
• 413
2725
203
'1334
275 •
175
19
27
Table 4. Cost Loading Report
REPORT DATE 29DEC97
RTP COST (SK) by WBS level 6 by Level 7
PR1MAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE
120.T25 Update Best Basis Inventory andTCRforSY-103 '
120.T35 Confirm Plans and Requirements (or SY-103
120. VOS Obtain AP-101 Samples
120.V10 Characterize.AP-fOI
120.V12 Review AP-101 Historical Data"
120.V14 Establish Dilution Rqmts for AP-101 Process Test
120.V15 Confirm Plans and Requirements for AP-101
120.V20 Update BBI &TCR For Tank AP-101
120.W05 Obtain AW-104 Samples
120.W10 Characterize AW-104
I20.WI2 ReviewAW104 Historical Data
120. W14 Establish Dilution Rqmts for AW-104 Process Test
120.W15 Confirm Plans and Requirements for AW-104
120.W20 Update BBI &TCR For Tank AW-104
130.010 Phase JTanfc Waste Transfer Control
130.D05 ID Reqd Spares WFD 1st Batches LAW S. LAW
130.B4S Prepare for Sampling During LAW Feed Staging
130.B75 Compare RAM/O&M Concept w/OTP Results
130.B80 Assess Sec Waste Util & Samp Anly Agnst Plans
130.N10 Prep for Sampling During HLWFeed Staging AZ-101
150.804 Perform Feed Rate Trade Study
150.806 Establish Feed Rates (RL Decision)
15O.B08 Maintain WFD Char Matrices, Prob Spec DQOs
150.B22 Maintain Operations Utilization Plan
150.824 Maintain ICDs •
150.B82 Perform Feed Tank Fill Status Trade Study
150.BS4 ' Establish Feed Tank Fill Status (RL Decision]
160.A12 EstabTech (Process) Reqmnts-Phase I Sldg Pret
160.A15 Assess Sec Waste. Uffl Samp Atity AgstPlan{HJ.W>
160.A16 Prep DQO for Privatization Char of Pot HLW Feed •
160.A17 Compare RAM/O&M ConceptvrfOTP Results (HLWj
160.A19 Retr. Revisa Pretreat Rqmts (A2-101/2 & AY-102)
160.A20 Finalize HLWPretreat Rqmts (AZ-101/2&AY-102)
160.A22 Determine Appropriate AltemaUve Tanks
160.A43 Optimize PH1 Feed Sludge Wash by Proc Sim'ulatio
160.A44 Dete/if Existing Data Meets DQO Needs- AZ-101
160.A46 Take Additional Grab Samples from AZ-101
1SQ.A4S Perf/Doc Smpl Analysis/Sldg Wash Test-AZ-101
186. 4119
139S683 .157
4386
40
477727 "
286211
3358
924
11
17
S1813216
12
24
12
S1519784
602426
405
602426504
705
504
37
115748.482
115 .663495
114636490
115616492
115540
115540
115492
115447
115352
501 . ^
115315
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST ($K) by WBS Level G by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
JACCOUNT ACCOUNTTITLE
160.F00 Deter if Existing Data Meets DQO Needs • AZ-102
160.F05 • ObtainCoroSmpls/PrepSubsmpls/CompforAZ-102
160.F10 Perf/Doc-SmplAnatysls/SldgWash Testing-AZ-102
160.F12 Update BBI andTCR for AZ-102
160.F15 Confirm that AZ-102 is Acceptable for Feed to PC
'160.H00 Deter if Existing Data Meets DQO Needs -AY-102
160.H05 • Obtn Coro Smpis/Prep Subsmpls/Comp for AY-102
160.H20 Perf/DocSmplAnatysis/SldgWashTesting.AY-102
160.H22 UpdateBBIandTCRforAY-102 '
160.J00 Deter if Existing Data Meets DQO Needs - C-104.
1S0.J05 ' Obtain Core Smpls/Prep Subsmpls/Comp for C-104
160.J10 Perf/Doc Smpl Analysis/SldgWash Testing C-104
160.J12 Update BBI and TCR for C-104
160.J15 Confirm that C-104 is Acceptable for Feed to PC
620.015 Develop Waste Feed Delivery Safety Basis DQO
620.020 Maintain Waste Feed Delivery System Summary
620.055 Develop Waste Feed Delivery Permitting DQO
620.060 Eval EnvmmntI Baseline HLW/LLWFeed Delivery
620.070 Update Environmental Baseline
620.090 Maintain EnvironmU Baseline for Phase I Ext Ops
TOTAL 11310102
211
2726
2728828
161321
1675132
11726
307. 27
25
774
1585
487
873
134
13854
1059
505
2624
256
131
5698
11310103 RETRIEVAL SYSTEMS DEF.
120.C25 Evaluate Equipment Rqmts in AY-101
120.E40 ReviseW-211 FDCforAN-104
120.G36 Decn Board/Acqn Strategy PHI Ret After AN-104
120.G39 Adjust Acquistion Strategy WFD System
120.G40 Revise W-211 FDCforAW-101
120.J40 ' ReviseW-211 FDCforAN-103
120.K40 Revise W-211 FDCforAN-107'
120.L37 Provide Documentation for W-TBO Validation
12O.L^O . PrepW-TBDPrj Definition/Tech Basis/FDC
120.U1 241-AN-102 Upgrades: Prep Tech Rqmnte&CDR
120.M40 241-AN-106 Upgrades: Prop Tech Rqmnts & CDR
120.P32 Validate SY-102 Design to DST Specification
120.R40 • Reviso W-TBD Design Specifications for SY-101
55
40
47
55
55
45 45 45 45 45 45
54
465
596
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST {$KJ by WBS Level G by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC9?
DATA DATE 01OCT37
[ACCOUNT ACCOUNT TITLE 1998
4125554
1395
FY1999
11395
FY2000
104104
2001FY-
2002. FY2003
FY2005
FY2006
FY2010
120.V25 Evaluate Equipment Rqmts in AP-101
120.W2S Evaluate Equipment Rqmts in AW-104
160.A2C Deve! Tech Rqmts & CDR For Addl Eqpt in AZ-101
160.F30 Reviso W-211 FDCfofAZ-102
160.H17 Revise W-211 FDCforAY-102
270. J99 ISSTRS Prj 1 st Tank C-104 & Retrieve to AN-105
TOTAL 11310103
11310106 W-320 C-106 SLUICING
050.010 W-320 Project Management
050.020 Design New Eqpmnt - W-320 Includes-C-106/AY-102
050.030 Construct New Eqpmnt - W-320 Includes C-106
050.040 ConstrucVATP Original Equipment for W-320
050.045 Dcsign/EquipmentSupportforW-320' -
050.050 Perform OTPfor W-320
050.060 Prepare Safety Doc Basis for Interim Ops - W-320
050.070 Prep/Conduct ORR/Receive RL Approval - W-320
050.090 Sluic Sludge Into AY-102 - W-320
050.100 Design Additional Equipment W-320
050.110 Construct Additional Equipment W-320
050.120 Test Additional Equipment W-320
050.130 Process Control Document-W-320 " •
TOTAL 11310106
11310107 INITIAL SST RETRIEVAL SYSTEM
270.J99 ISSTRSPfj 1stTankC104 & Retrieve to AN-105
TOTAL 11310107
11310109 RETRIEVAL OPS (SST)
270.J99 ISSTRS Pij 1st Tank C-104 & Retrieve to AN-105
TOTAL 11310109
2321 2561
1242852
6142662
2217777181800
1242
2458185538
401
40
19355
5627 6758 6731 6758 5466
5627 6758 6731 6758 5466
703 2900
: Table 4. Cost Loading Report
REPORT DATE 29DEC971G:45
RTF> COST (SK) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP17DEC37
DATAOATE01OCTS7
FYACCOUNT ACCOUNT TITLE 1998
FY1999
FY2000
FY2001
FY2002 •
FY2003
FY2004
FY2005
FY2006
FY2007
FY2008
F.Y2009
FY2010
FY2011
11310110 FUTURE DST RETRIEVAL PROJECTS
120.A88 Preparefor ORRAZ-101
120.B10 Dsn/lnstall Central Control Room/Shift Ofc Fad
120.C30 UpgradeWasteTankAY-101 asRequired . •
120.L39 Dofine Project Management for W-TBD
120.L50 241-AN-102 Upgrades: Design & Enviro. Permits
120155 241-AN-102 Upgrades: ConstfATP/Tumover/H14 Dwgs
120.L60 241-AN-102 Upgrades: Startup/OTP/Ops Documents
120X68 PrepforORRfor241.AN.102
120.L70 ContractorlndependentORRfor241-AN-1Q2 '
120.M50 241-AN-106 Upgrades: Design & Enviro. Permits
120.M55 241-AN-106 Upgrades: ConstfATP/Tumover/Hi4 Dwgs
120.M60 241-AN-106 Upgrades: Startup/OTP/Ops Documents
120.M68 Prep for ORR on Tank 241-AN-1O6
120.M70 Contractor Independent ORR for 241-AN-106
120.R50 Design Upgrade W-TBD for SY-101
120.R52 Equipment Procurement for SY-101
120.R55 Construct/Test/Project Turnover of SY-101
120.R60 Startup for SY-101 (W-TBD) Mixing & Retr Sys
120.R68 PrepforORRon241-SY-101
120.R70 Contract Independent ORRon241-SY-101
120.T50 Design Upgrade W-TBD forSY-103
120.T52 Equipment Procurement W-TBD for SY-103
120.T55 •ConstructfTesVProject Turnover of SY-103
120.T60 Startup for SY-103 QV-TBD) Mixing & Retr Sys
120.T6S Prep for ORR on SY-103
120.T70 Contract Independent ORR on SY-103
120.V30 Upgrade Waste Tank AP-101 as Required
120.W30 Upgrade Waste Tank AW-104 as Required
130.862 Upgrd Valve Pits AW-A&B - W-454-Replace Jumpers .
160.A32 Redesign Addl Eqpt Req'd for Sludge WashJ\Z-101 •
160.A36 ConsUuct Equip Req"d for Sludge Washing-AZ-101
160.A38 UpgradeA2-101 W-xxx
160.AflO Contractor Independent ORR for A2-101
160.A41 Develop Draft Sludge Wash Temp Control Rqmts
160.A42 DOE ORR for AZ-101
1221591
252708
36443069
420764
174928053678
22601254
85246
420767
5624
155.
32524449
937
303'303
5184155115
85146
523 •
1816
105
1776966
15
3183155
•115
10
19221816140111
4121314
5527
34423290
11310110 6713 12929 17286 11166
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST ($K) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE
FY1998
FY1999
FY2000
FY2001
FY2002
FY
2003FY
2004FY
2005FY
2006FY
2007FY
2003FY
2009FY
2010 2011
11310112 PH1 RETRIEVAL OPS (DST) •
050.080 Interface (xfr Part of AY-102 Supernatant Out)
120.B40 ' Prepare AP-102/AP-104forTumover to Project
130.015 Manage Waste Transfer System During Xfer Sys Up
130.B10 Procure WFD Spare Equip (Operations)
- 130.B15 Prep to Maintain the WFD Sys Operable
130.B16 Maintain WFD Sys Operable
13C5.B25 DegasAN-105
130.B30 Mob/RetrWstinAN-105/RecFeedinAP-102/AP-104
130.B40 Perform Bootstrap Transfers
130.B55 Prepare Batch 1 Process Control Plan AN-105
130.C10 ' Retrieve Waste in AY-101/Receive Feed in AP-102
130.C20 Retrieve Waste in AY-101 /Receive Feed in AP-104
130.C25 Prepare AY-101 Process Control Plan
130.E10 Degas AN-104 •
, 130.E25 Prepar AN-104 Process Control Plan
130.E30 Mob/RetrWstinAN-104/RecFeedinAP-102/104
130.F10 B.S. XferAZ-102 Supemate into AY-101/AN-104
130.F20 Prepare AZ-102 PRocess Control Plan
130.G10 DegasAW-101
130.G25 PrepareAW-101 Procoess Control Plan
130.G30 Mob/RetrWstinAW-101/Rec Feed in AP-102
130.G40 Transfer 2nd Vendor Waste From AW-101 to AP-104
130.H10 Bootstrap Trans AY-102 Supemate into AN-105
130.H20. Prepare Tank 241-AY-102 Process Control Plan
130.J10 OegasAN-103
130.J20 Prepare C-1CM/AZ-101 Process Control Plan
130. J25 _ Prepare AN-103 Process Control Plan
130.J30 Transfer Wst in AN-103/Rec Feed in AP-102
13Q.J40 Transfer Wst in AN-103/Rec Feed in AP-104
130.K20 Prepare AN-107 Process Control Plan
130.K30 Transfer Wst in AN-107/Rec Feed in AP-102
130.K40 Transfer Wst in AN-107/Rec Feed in AP-104
130.L20 ' PreparoAN-102ProcessControlPlan
130X30 Transfer Wst in AN-102/Rec Feed in AP-102
130.L40 Transfer Wst in AN-102/Rec Feed in AP-104
130.M20 Prepare AN-106 Process Control Plan
2917235
46
42469582
311635
1641233
924
208954 '
311291 '
2190
1711
404024
1624169
37
293402411 .24
11
43
24940322453
24129
11
11
1123631
11404024404024
Table 4. Cost Loading Report
REPORT DATE 29OEC9716:45
RTP COST (JK) by WBS Level G by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE 2001 .2002
130.M40 Transfer Wst in AN-106/Rcc Feed in AP-104
130.N20 Prepare Process Ctrl Plan AZ-101
130.N30 Btstrap Trans AZ-101 toAY-101 '
130.P50 Mob/RotrWstinSY-102/RecFeedinAW-105
130.R10 Degas SY-101
13O.R25 Preparo SY-101 Process Control Plan
130.R30 Mob/Relr 1st Wst in SY-101/Rec Feed in SY-102
130.R35 X-Site Transf 1st SY-101 from SY-102 to AN-102
130.R40 Mob/Retr 2nd Wst in SY-101/Rec Feed in SY-102 '
130.R45 Transfer 1st SY-101 from AN-102 to AP-102
13O.R5O X-Sito Transf 2nd SY-101 from SY-102 to AN-107
130.R55 Transf 2nd SY-101 fromAN-107 to AP-104
130.T10 Dogas SY-103
130.T25 Preparo SY-103 Process Control Plan
130.T30 Mob/Retr Wst in SY-103/Rec Feed in SY-102
130.T35 X-Site Trfr Btch 1 SY-103/Feed1 SY-102 to AN-102
130.T40 Mob/RetrWstinSY-103/RecFeedinSY-1Q2
130.T45 Trfr Btch 1 SY-103 Feed from AN-102 to AP-102
130.T50 X-Site Trfr Btch 2 SY-103/Feed SY-102 to AN-107
130.T55 Trfr Btch 2 SY-103 Feed from AN-107 to AP-104
130.V10 Retrieve Waste in AP-101/Receive Feed in AP-102
. 130.V20 Retrieve Waste in AP-101/Receive Feed in AP-104
130.V25 Prep AP-101/AW-104 Batch Process Control Plan
130.W10 Retrieve Waste inAW-104/Recelve Feed In AP-102 •
130.W20 Retrieve Waste In AW-104/Receive Feed in AP-104 •
150.B32 Mix AN-105 Feed in AP-102
150.B42 Adjust AN-105 Feed in AP-102
150.B44 DeliverAN-105FeedtoAP-106 ,
150.B48 Mix AN-105 Feed in AP-104
150.B58 AdjustAN-105FeedinAP-104
150.B60 Deliver AN-105 Feed to AP-108 . .
15O.CO5 Mix AY-101 Feed in AP-102
150.C30 Adjust AY-101 Feed inAP-102
150.C35 Deliver AY-101 Feed from AP-102 to AP-106
150.C40 MixAY-101 FeedinAP-104
1S0.C65 AdjustAY-101 FeedinAP-104
150.C70 Deliver AY-101 Feed from AP-104 to AP-108
150.E05 Mix AN-104 Feed in AP-102
4040,244040
4161
A110
26935265935
30169
4005324271
, 169
24
•169
16-2412
40
4037
25916924
169
11
40
40
REPORT DATE 29DEC9716:45
RTP COST (SK) by WBS Level 6 by Level 7
Table 4. Cost Loading Report" PRIMAVERA PROJECT PLANNER
COST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE
150.E35 DeliverAN-104 Feed from AP-102 to AP-106
150.E40 Mix AN-104 Feed in AP-104
150.E64 Empty AP-107 Into AN-104 for Vendor Returns
150.E65 Adjust AN-104 Feed in AP-104
150.E70 Deliver AN-104 Feed from AP-104 to AP-108
150.G05 MixAW-101 FeedinAP-102
150.G30 AdjuslAW-101 Feed inAP-102
150.G35 Deliver AW-101 Feed from AP-102 to AP-106
150.G40 MixAW-101 FeedinAP-104
150.G65 AdjustAW-101 Feed lnAP-104
15O."G7O Deliver AW-101 Feed from AP-104 to AP-108
150.J05 Mix AN-103 Feed in AP-102
150.J30 'Adjust AN-103 Feed in AP-102 •
150.J35 Deliver AN-103 Feed from AP-102 to AP-103
150.J40 Mix AN-103 Feed in AP-104
15O.J65 Adjust AN-103 Feed in AP-104
150.J70 Deliver AN-103 Feed from AP-104 to AP-108
150.K05 MixAN-107FeedinAP-102
150.K30 Adjust AN-107 Feed
150.K35 Deliver AN-107 Feed fromAP-102 to AP-108
150.K37 Deliver AN-107 Feed from AP-102 to AP-106
150.K70 Deliver AN-107 Feed from AP-104to AP-108
• 150.K72 Deliver AN-107 Feed from AP-104 to AP-108
150X05 Mix AN-102 Feed in AP-102
150.L30 Adjust AN-102 Feed in AP-102
150X35 Delivor AN-102 Feed from AP-102 to AP-106
150X40 Mix AN-102 Feed in AP-104
150X65 Adjust AN-102 Feed in AP-104
150X70 Deliver AN-102 Feed from AP-104 to AP-108
150.M05 Mix AN-106 Feed inAP-102
150.M30 Adjust AN-106 Feed inAP-102
150.M35 Deliver AN-106 Feed from AP-102 to AP-106
150.M40 Mix AN-106 Feed in AP/IQ4
150.M65 Adjust AN-106 Feed in AP-104
150.M70 Deliver AN-106 Feed from AP-104 to AP-108
150.R05 MixSY-101FeedinAP-102 -
150.R30 • Adjust SY-101 Feed'in AP-102
150.R35 Deliver SY-101 Feed from AP-102 to AP-106
3044
3530
1693130
16912 24
301653530
30169
3535353530
1693530
169
4
165 •
3526
43530
1693530
169
REPORT DATE 29DEC9716:45
RTP COST t$K) by WBS Level 6 by Level 7
Table 4. Cost Loading Report~ PRIMAVERA PROJECT PLANNER
COST LOADING REPORT
TOTAL USAGE FOR YEAR'
RTP 17DEC97
DATA DATE 01OCT97
[ACCOUNT ACCOUNTTITLE
150.R65 AdjustSY-101 FeedinAP-104
150.R70 Deliver SY-101 Feed from AP-104 to AP-108
150.TQ5 Mix SY-103 Feed in AP-102
15Q.T30 Adjust SY-103 Feed in AP-102
150.T35 Deliver SY-103 Feed from AP-102 to AP-106
150.T40 Mix SY-103 Feed in AP-104
150.T65 Adjust SY-103 Feed in AP-104 ' ^
150.T70 DeliverSY-103 FeedfromAP-104toAP-108
150.V05 Mix AP-101 Feedln AP-102
150.V30 AdjustAP-101 FeedinAP-102
150.V35 . De1iverAP-101FeedfromAP-102toAP-106
150.V40 MixAP-101 Feed inAP-104
150.V65 AdjustAP-101 FeedinAP-104 .
150.V70 Deliver AP-101 Feed from AP-104 to AP-106
160.A52 PretreatA2-101 (In-Tank Sludge Washing)
K5O.A62 Perf Final Decant/Add Transfer Solution - AZ-101
160.A64 Mix Waste to Resuspend Solids for AZ-1014 160A72 Deliver Second Batch of Feed fromAZ-101
160.A78 Deliver First Batch of Feed fromAZ-101
160.F65 Pretreat AZ-102 (In-Tank Sludge Washing)
16O.F70 Perf Final DecantfAdd Transfer Solution-AZ-102
1G0.F75 Mix Waste to Resuspend Solids for AZ-102 •
160.F95 Deliver First Batch of Feed from AZ-102
160.F99 Deliver Second Batch of Feed from AZ-102
160.H27 Pretreat AY-102 {In-Tank Sludge Washing)
160.H45 Perf Final Decant/Add Transfer Solution-AY-102
160.H47 Mix Waste to Resuspend Solids for AY-102
16O.H75 Deliver First Bateh of Feed from AY-102 •
1G0.H80 Deliver Second Batch of Feed fromAY-102
160.H85 Deliver Third Batch of Feed fromAY-102
160.H90 Deliver Fourth Batch of Feed (romAY-102
16O.H95 Deliver Fifth Batch of Feed fromAY-102
160.J65 Pretreat C-104/AZ-101 (In-Tank Sludge Washing)
16O.J70 Perf Decant/Add Transfer Solution - C-104/AZ-101
160.J75 Mix Waste to Resuspend Solids forC-104/AZ-101 '
16O.J95 Deliver 1st Batch of Feed from C-104/AZ-101
160J97 Deliver 2nd Batch of Feed from C-104/AZ-101
160J99 Deliver 3rd Batch of Feed from C-104/AZ-101
3S0.X05 . Transfer PC#1 6 PC#2 Solids to AP-107
145223159
181366 76
231589
35301693530169
30169
30169
101082023
158 •
1010
• 23
158
1010
10
34
11310112
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST t$K) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
|ACCOUNT ACCOUNTTITLEFY
2004FY
200611310113 PH1 RETRIEVAL SAFETY BASIS
130.B17 Devel Tech Basis: Rem Waste FAVatchlist Tanks13O.B2O Obtain Permission to Add Diluent to FGWL DSTs'
150.B10 Safety Analysts and Evaluation
150.814 Develop/Establish TSRs
150.B16 • Update/Amend Auth Basis for WFD Activities620.030 Perform Feed Delivery USQ Process for HLW/LLW
620.050 Develop Waste Feed Delivery Licensing Strategy.
TOTAL 11310113 * •'
11310114 PH1 RETR OPS (CHARACTERIZATION)
150.B34 Obtain AN-105 Feed Qual Samples from AP-102
• 150.B36 Provide AN-105Samp!esffomAP-102 to PC 1
j 150.B38 Analy AN-105 Smpls/lnterpret Results from AP-102
150.840 Prov AN-105 Feed Batch Info from AP-102 to PC 1
150.B50 Obtain AN-105 Feed Qual Samples from AP-104
150.B52 Provide AN-105 Samples from AP-104 to PC 2
150.B54 Analy AN-105 Smpls/lnterpret Results fromAP-104
150.856 Provide AN-105 Feed Batch Into to PC 2
150.C10 Obtain AY-101 Feed Qual Samples from AP-102
150.C15 Provide AY-101 Samples from AP-102 to PC 1
150.C20 Analy AY-101 Smpls/lnterpret Results fromAP-102
150.C25 Provide AY-101 Feed Batch Info to PC 1
150.C45 Obtain AY-101 Feed Qual Samples fromAP-104
150.C50 Provide AY-101 Samples from AP-104 to PC 2
1S0.C55 Analy AY-101 Smpls/lnterpret Results fromAP-104
150.C60 ' ProvAY-101 Feed Batch Info from AP-104 to PC 2
150. E10 Obtain AN-104 Feed Qual Samples from AP-102
150.E15 Provide AN-104 Samples from AP-102 to PC 1
150.E20 Analy AN-104 Smpls/Jnterpret Results fromAP-102
150.E25 Provide AN-104 Feed Batch Info to PC 1
150.E45 Obtain AN-104 Feed Qual Samples fromAP-104
150.E50 Provide AN-104 Samples from AP-104 to PC 2
150.E55 Analy AN-104 Smpls/lnterprefResults fromAP-104
150.EE0 Prov AN-104 Feed Batch Info from AP-104 to PC 2
439126
1 1 •
40166
805
30
1696
2151
1696
2151
2151
2426
2151
2426
2161
2426
216
REPORT DATE 2SDEC9716:45
RTP COST (JKJ by WBS Level 6 by Level 7
Table 4. Cost Loading ReportPRIMAVERA PROJECT PLANNER
COST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
[ACCOUNT ACCOUNT TITLE
150.G15 Provide AW-101 Samples fromAP-102 to PC 1 .
150.G20 Analy AW-101 Smpls/lnterpret Results from AP-102
150.G25 ProvAW-101FeedBatch1nfofromAP-102toPC1
150.G45 Obtain AW-101 Feed Qual Samples from AP-104
150.G50 Provide AW-101 Samples from AP-104 to PC 2
150.G55 Analy AW-101 Smpls/lnterpret Results from AP-104
150.GSQ Prov AW-101 Feed Batch Info from AP-104 to PC 2
150. J10 Obtain AN-103 Feed Qual Samples from AP-102
'150.J15 Provide AN-103 Samples from AP-102 to PC 1
150. J20 Analy AN-103 Smpls/tnterpret Results from AP-102
* 150.J25 . Provide AN-103 Feed Batch Info to PC 1
150.J45 Obtain AN-103 Feed Qual Samples from AP-104
150.J50 Provide AN-103'Samples from AP-104 to PC 2
150.J55 Analy AN-103 Smpls/lnterpret Results from AP-104
1S0.J60 Prov AN-103 Feed Batch Info from AP-104 to PC 2
. 150.K10 Obtain AN-107 Feed Qual Samples fromAP-102
150.K15 Provide AN-107 Samples fromAP-102 to PC 1
150.K20 Analy AN-107 Smpls/lnterpret Results from AP-102
150.K25' Prov AN-107 Feed Batch Info from AP-102 to PC 1
150.L10 Obtain AN-102 Feed Qual Samples from AP-102
150.L15 Provide AN-102 Samples fromAP-102 to PC 1
150X20 Analy AN-102 Smpls/lnterpret Results fromAP-102
150X25 Prov AN-102 Feed Batch Info from AP-102 to PC 1
150.L45 Obtain AN-102 Feed Qual Samples from AP-104
150X50 Provide AN-102 Samples from AP-104 to PC 2
150.L55 Analy AN-102 Smpls/lnterpret Results fromAP-104
150.160 Provi AN-102 Feed Batch Info fromAP-104 to PC 2
. 150.M10 Obtain AN-106 Feed Qual Samples from AP-102
150.M15 Provide AN-106 Samples from AP-102 to PC 1
150.M20 Analy AN-106 Smpls/lnterpret Results from AP-102
150.M2S Prov AN-106 Feed Batch Info fromAP-102 to PC 1
150.M45 Obtain AN-106 Feed Qual Samples fromAP-104
150.M50 Provide AN-106 Samples fromAP-104 to PC 2
150.M55 Analy AN-106 Smpls/lnterpret Results fromAP-104
15O.M60 Prov AN-106 Feed Batch Info from AP-104 to PC 2
150.R10 Obtain SY-101 Feed Qual Samples from AP-102
150.R15 Provide SY-101 Samples fromAP-102 to PC 1
15O.R20 Analy SY-101 Smpls/lnterpret Results fromAP-102
FY2003
6216
1242
6216
1
FY2004
2366"
2161
242
6216
1242
6216
1
2426
2161
2426
2161
510
1916
2161
2426
2161
2426
216
REPORT DATE29DEC3716:45
RTP COST ($K) by WBS Level $ by Level 7
Table 4. Cost Loading ReportPRIMAVERA PROJECT PLANNER
COST LOADING REP.ORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE "
150.R45 Obtain SY-101 Feed Qual Samples fromAP-104
1S0.R50 Provido SY-101 Samples from AP-104 to PC 2
150.R55 Analy SY-101 Smpls/lnterpret Results from AP-104
1S0.R60 Prov SY-101 Feed Batch Info from AP-104 to PC 2
150.T10 Obtain SY-103 Feed Qual Samples from AP-102
150.T15 Provide SY-103 Samples from AP-102 to. PC 1
150.T20 Analy SY-103 Smpls/lnterpret Results from AP-102
150.T25 Prov SY-103 Feed Batch Info fromAP-102 to PC 1
150.T45 Obtain" SY-103 Feed Qual Samples from AP-104
150.T50 Provide SY-103 Samples from AP-104 to PC 2 -
150.T55 Analy SY-103 Smpls/lnterpret Results from AP-104
150.T60 . ProvSY-103FeedBatohlnfofromAP-104toPC2
150.V10 Obtain AP-101 Feed Qual Samples from AP-102 "
150. V15 ProvideAP-101 Samples from AP-102 to PC 1
150.V20 Analy AP-101 SmpIs/Interpret Results from AP-102
"f" 150.V25 ProvideAP-101 Feed Batch Info to PC 1
© 150.V45 ObtainAP-101 Feed Qual Samples from AP-104
1SO.V50 Provide AP-101 Samples from Ap-104 to PC 2
150. V55 Analy AP-101 Smpls/lnterpret Results from AP-104
150.V60 Prov AP-101 Feed Batch Info From Apv104 to PC 2 '
160.A25 Update BBl &TCR to Reflect Process Test AZ-101
160.A66 Obtain HLW Feed Qual Grab Samples AZ-101 Solids
160.A68 Eval Samples/Establish MT for AZ-101
160.A74 Provide Separate Samples to the PC - AZ-101
1$0.A76 Prov MT Non-Volatile Oxides Exclude Na/Si-AZ-101
160.F50 Obtain HLW Feed Qual Grab Samples AZ-102 Solids
160.F55 Eval Smpls/Estab MTof Non-Volatile for AZ-102
160.F85 Provide Separate Samples to Private Contractor
160.F90 • Provide MT Non-Volatile Oxides Excluding Na/Si
160.H25 Confirm that AY-102 is Acceptable for Feed to PC '
160.H50 Obtain HLW Feed Qual Grab Samples AY-102 Solids
160.H55 Eval Smpls/Estab MT of Non-Volatile for AY-102
160.H65 Provide MT Non-Volatile Oxides Excluding Na/Si
160.H70 Provide Separate Samples to PC-AY-102 '
160.J50 Obtain HLW Feed Qual Grab Samp C104/AZ-101
160. J55 Eval Smpls/Estab MT of Non-Volatile for C-104
.. 160.J85 Provide Separate Samples to Private Contractor
160.J90 Provide MT Non-Volatile Oxides Excluding Na/Si
255394
41
2002 2003 2004 2005 2006 2007 200B 200S242
6207 9 '
1242
6 '216 •
1
242 •
2161
2426
205 11' 1
242 .6
198 18
218392
. 31
254392 "
13
254392
31
11310114
Table 4. Cost Loading Report
REPORT DATE 29DEC97. 16:45
RTP COST t$K) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
. TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE 199S 1993 2000 2001 2002 2003 2004 2005 • 2006 2007 2003 2009 2010 2011
11310126 W-314 PH 1 REST/SAFE OPS (L)
250.110 Project W-314 (Phase I) Management
250.120 Project W-314 {Phase I) Permits/Safety Analysis
250.4AO W-314 Master Pump Shut Down Upgrades
250.4C0 W-314 Upgrades to AN Farm
250.4D0 W-314AZ Farm Upgrades
250.4E0 W-314 200 E/WPiping Upgrades
250.4E5 Prepare AW Farm (or Construction Actitivies
250.4F0 W-314 AW Farm Upgrades
'250.4GO W-314 Upgrades to AY Farm
250.CO1 Prepare AN Tank Farm for W-314 Construction
TOTAL 11310126
11310140 W-31'4 PH 1 REST/SAFE OPS/(E)
250.130 Project W-314 (Phase I) Implementation
TOTAL 11310140
7135 5450 1394225 136 74
3340 : 4293 157641791286 36214416 ' 5546 857179" *698 1707
1747 1372
208
23412 22126 " 3900
1131014E PROJECT-W-151 101-AZ RETRIEVAL (L)
110.010 W-151 Project Management
110.050 Conduct LMHC Readiness Assessment
110.070 Perform Mixer Pump Test (W-151)
TOTAL 1131014E
1131014P PROJECTW-151 101-AZPROCESSTEST
110.010 W-151 Project Management
110.045 Revise/lss Mixer Pump Test Plans/Procedures
110.070 Perform Mixer Pump Test (W-151)
110.090 Prepare Test Report fW-151)
113187
1
5131
20798
1131014P
Table 4S Cost Loading Report
REPORT DATE 2SDEC9716:45
RTP COST (JK) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNECOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE
FY1398
FY1999
FY-2000
FY2001
FY2002
FY2003 .
FY2004
FY2005
FY2006
FY2007
FY2008
FY2009
FY
2010
FY
2011
1131015E W-211 INITIAL TANK RET SYSTEMS (EXPENSE)
120.A0O W-211 Project Management
120.B50 W-211 Startup AP-102/AP-104 Retrieval Systems
120.B58 • Prop for ORR onAP-102 & 104
120.B60 Contract Independent ORR on AP-102 & 104
120.D80 W-211 Startup AN-105 Retrieval System
120.083 " Prep ORR AN-105
120.D90 ContractihdependentORRAN-105 . " ' *
120.E60 W-211 Startup AN-104 Mixing & Retrieval System '
120.E68 Prep for Readiness Rvwon 241-AN-104
120.E70 Contractor Independent ORR for 241-AN-104
120.F60 W-211 Startup AZ-102 Retrieval System
120.F68 Prepare for ORR AZ-102
120.F80' Contractor Independent ORR for AZ-102
• 120.G60 W-211 StartupAW-101 Retrieval System
120.G68 PrepforORRonAW-101
120.G70 Contract Independent ORR on AW-101
120.H30 W-211 Startup AY-102 Retrieval System
120.H50 Contractor independent ORR AY-102
120.H68 Prepare for ORR AY-102
120.J60 W-211 Startup AN-103 Retrieval System
120.J68 PfepforORRon241^AN-103
120.J70 Contractor Independent ORR for241-AN-103
120X60 Upgrd W-211 OTP/Ops Docmntn for AM-107 (Ops)
120.K68 Prep for ORR for 241-AN-107 - •
120.K70 Contractor Independent ORR for 241-AN-107
120.P22 Contractor Independent ORR for SY-102
120.P70 W-211 Startup SY-102 Retrieval System
120.P90 Prep for ORR on 241-SY-102 Project W-211-
TOTAL 1131015E
1131015L W-211 INITIAL TANK RET SYS (LINE ITEM)
37151
37151
6599
65 .544283116
128351
7
405
64113
'26268
26150
22226
250
476118986
4921
89233155115
312403
120.A00 W-211 Project Management
120.B35 W-211 Design AP-102/AP-104 Retrieval Systems
120.B42 W-211 Equip Procure AP-102/AP-104 Retrieval Syst
241634833374
6894614
2715
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST ($K) by WBS Level 6 by Lavet 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
.FYACCOUNT ACCOUNTTITLE 1998
FY1999
FT2000
FY2001 2002 2003 2004 2005 2006 2007 2008 2009
FY2010
FY2011
120.D65 W-211 Design AN-105 Retrieval System '
120.D72 W-211 Equip Procurement AN-105 Retrieval System
120.D75 W-211 ConstructionAN-105 Retrieval System
120.E5O W-211 Design AN.1Q4 Retrieval System
120.E52 W-211 Equip Procurement AN-104 Retrieval System
120.E55 . W-211 Construction AN-104 Retrieval System
120;F40 W-211 Design AZ-102 Retrieval System
120.F5O W-211 Construction AZ-102 Retrieval System
120.F52" W-211 Equip Procurement AZ-102'Retrieval System .
120.G50 W-211 DesignAW-101 Retrieval System
120.G52 W-211 Equip Procurement AW-101 Retrieval System
120.G55 W-211 Construction AW-101 Retrieval System
120.H10 W-211 DesfgnAY-102RetrievalSystem . '
120.H15 W-211' Equip Procurement AY-102 Retrieval System
120.H20 W-211 Construction AY-102 Retrieval System
120.J50 W-211 Design AN-103 Retrieval System
120.J52 W-211 Equip.ProcurementAN-103 Retrieval System
120.J55 W-211 Construction AN-103 Retrieval System
120.K50 W-211 Design AN-107 Retrieval System
120.K52 W-211 Equip Procurement AN-107 Retrieval System
120.K55 W-211 Construction AN-107 Retrieval System
120.P60 W-211 Construction SY-102 Retrieval System
TOTAL 1131015L
11340101 ILAW PROJECT ADMINISTRATION •
460.005 ILAW Oisposal AdministratiortfManagement
TOTAL 11340101
2461801
1016263
98
733991
463418521543
. 1614
586385
5494
5138613
478381010881566900
123552
20451014
563114
2517
4710
ISO679
5832869161
10711116268038751409906
2986
4598
8146
4096129
13912 31020 41765 29348 27388 10636 12572
356
856
11340102 ILAW SYSTEMS DEFINITION
460.005 ILAW Disposal Administration/Management
460.015 Maintain ICOs
460.030 Maintain Technics! Requirements (DRD)
460.035 Project Management Plan
460.075 Prepare NEPA Documentation (W-465)
4G0.095 Prepare/Maintain DRD - Disposal Facilities
56
208
172
15
20
281
TOTAL 11340102 752
Table 4. Cost Loading Report
REPORT DATE29DEC9716:45
RTP COST ($K) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
"RTP17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNT TITLE
11340104 ' PROJECTW-465
440.110 Prepare NEPA Documentation (W-464)
440.120 • Authorization Basis Oevefopment & Appr (W-464;
460.015 Maintain ICDs
460.040 ILAWStorage Conceptual Design QAMS5)
460.045 ILAW Storage Adv Conceptual Design Qtf-465)
460.060 Project Validation (W-465)
460.065 ILAWStorage Detailed Design (W-465)
460.070 Modify Vaults (W-465)
460.075 Prepare NEPA Documentation (W-465)
460.080 Prepare RCRA Permits (W-465)
460.085 Authorization Basis Development & Appr (W-465)
470.010 Procedures/Training/OTP/ORR Onitial Phase I)
f 1 TOTAL 11340104t o.£-
11340105 ILAW OPERATIONS
460.160 Data Collection for Performance Assessment
460.170 Maintain ILAWPhase I Performance Assessment
470.010 Procedures/Training/OTP/ORR "(Initial Phase I) "
470.040 InterimStore ILAW Operations (Initial Phase I)
470.060 " Procedures/Trainlng/OTP/ORR {Balance Phase I)
470.075 Dispose ILAW Operations (Balance Phase I)
TOTAL 11340105
33276520-104
626876
98218
730
49366191
244193
35421639215278370
232203139
341413116' 12
177393
327136
12044
15709693
6482 17686 13925
2559
729
2430
1725
'4547311141486
2794S8
1935775
20405
19431538
400
1935'1270636
398
1927
3700
341.
1935
3715
300
1295
3715 3715
4015
11340106 PROJECT W-520 FUTURE FACILITIES
460.105 Conceptual Design - Disposal Facilities (W-520)
460.110 Advanced Conceptual Dsn - Disposal Fac (W-520)
460.112 Validate Project (W-520)
460.115 Design Oisposal Facilities (W-520)
460.120 Construct Disposal Facilities (W-520)
460.125 Regulatory Requirements for Disposal Facilities
460.130 Authorization Basis Development and Approval
TOTAL 11340106
302853129
778
378178
575270
55147181437
9686 55765 74461
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST (IK) by WBS Level S by Level 7
. PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT37
ACCOUNT ACCOUNT TITLEFY
2001
FY
2006FY
2011
11340107
470.080
TOTAL
1134013B •
460.14S •
TOTAL
1134013E
460.140
460.145
460.155
TOTAL
1134013M
460.145
TOTAL
11340201
440.010
TOTAL
11340202 •
440.010
440.020
440.030
440.040
490.090
TOTAL
ILAW FACILITY CLOSURE AND D3.D
Close ILAW Disposal Facilities
11340107
Obtain Borehole #1 Samples (C)
Date Collection for 2001 Performance'Assessment
1134013B '
ILAW PERFORMANCE ASSESSMENT (E)
1998 Performance Assessment
Data Collection for 2001 Performance Assessment
2001 Performance Assessment
1134013E
X-Ray Microtomography Equip (C)
Data Collection for 2001 Performance Assessment
1134013M
IHLW PROJECT ADMINISTRATION
IHLW Interim Storage Administration/Management
11340201
IHLW SYSTEMS DEFINITION
IHLW Interim Storage Administration/Management
Prepare/Maintain ICDs (ID 13,14,17)
Project Management Plans "
Maintain Technical Requirements (DRD)
Negotiate RW Requirements
11340202
602 1513
602 1513
443 113087 3465 944 291
326 1J4
3531 3476 1270 405
170 107 104 138 • 138 138 139 138 138 138 138 138 138 138
170 107 104 138 • 138 138 139 138 138 138 138 138 138 138
50
334 132
27
158 18
74
644 149
69
18
68. 61
Table 4. Cost Loading Report
REPORT DATE 29DEC97' 16:45
RTP COST ($K) by WBS Level 6 by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC97
DATA DATE 01OCT97
ACCOUNT ACCOUNTTITLE
11340203 PROJECT W-464
440.050 IHLW Storage Conceptual Design Q/V-464)
440.060 Advanced Conceptual Design (W-464)
440.070 . Project Validation Otf-464)
440.090 Procure Equipment (W-464)
440.100 Design IHLWStorage Facility (W-464) .
440.110 Prepare NEPA Documentation (W-464)
' 440.115 Preparo RCRA Permits A/i/^64) '
440.120 Authorization Basis Development & Appr (W-464)
440.140 Modify/Construct System (W-464)
450.010 Prep OTPs/Conduct Readiness Assessmnt (Phase I)
TOTAL 11340203
11340204 IHLW OPERATIONS
450.030 Transport/Receive/Interim Store IHLW (Phase 1)
TOTAL 11340204 .
11380101 PH-1 INFR. PROJ. MGT/ADM.
330.010 • Project Ad ministration/Man age ment/Engineeting.
TOTAL 11380101
11380102 PH-1 INFR. SYSTEM DEFINITION
150.B66 Ready PHMC Oper/Maint Doc-AP-108 Turnover
15O.B76 Ready PHMC Oper/Maint Doc-AP-106 Turnover
150.B88 Prep AP-106 for Turnover to Private Contractor
150.B94 Establish Interface Reqmnts for Tank Turnover
150.B98 Prep AP-108 (or Turnover to Private Contractor
330.020 Systems Definition
40117543
138523-
190
469
62810049
155129
.1061
162711559
477101
18407
10923039
23148
27273520835
747747
TOTAL 11380102
Table 4. Cost Loading Report
REPORT DATE 29DEC9716:45
RTP COST ($K) by WBS Level S by Level 7
PRIMAVERA PROJECT PLANNERCOST LOADING REPORT
TOTAL USAGE FOR YEAR
RTP 17DEC37
DATA DATE 01OCT97
ACCOUNT ACCOUNTT TLE 1996 1999 • 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010FY
201111380103 -PH-1 INFR.PROJECTW-S19INFRASPRJ
330.010 Project Administration/Ma nagement/Engineerina
330.020 Systems Definition
330.030 IC Document Ravisions/lC Drawings " -
330.040 Compl Infrastnjcture Electrical Sys Contract Pkg
330.050 Design/Construction/Startup Electrical System
330.060 Dsn/Construction Site Sys for PC Construction .
330.070 Dsn/Construct/S/up Water, Sita, Liq Eft Systems
TOTAL 11380103
11380104 PH-1 INFR. M&l OPERATIONS
f330.010 Project Ad ministration/Manage me ntfEngineering
f * 330.080 Maint/Op/Provida Vendor Utils (or Constr PC Phi
330.090 MainVOp/Prov Vendor Utils/Wst Disp Slap PC Phi
330.100 MainVOp/Prov Vendor/Wst Disp Prodctn PC Phi
330.120 Provide Vendor Staff Training
TOTAL 11380104
11380105 PH-1 INFR. PC OPERATIONS
330.080 MainVOp^rovide Vendor Utils for Constr PC Phi
330.090 Maint/Op/Prov Vendor Utils/Wst Disp S/op PC Phi
330.100 Maint/Op/Prov Vendor/Wst Disp Prodctn PC Phi
TOTAL 11380105
REPORT TOTAL
1092
843
237
142
7315
349
10416 •
1716
2903
15383
432
9856
•6165
.•16453
15
61
15
80
8669
15
20
119
95
17235
8764 17483
• 992
12537
13455 40851 40689 40526 40689 40689 40689 26910
3072 4080 26984 40689 40851 40689 40526 40689 40S89 40689 40689 26910
86777 113628 124741 114965 128071 146338 170334 78204 66576 58898 57065 55423 54637 37599
HNF-I946 Rev. 0
5.0 SIGNIFICANT PROGRAM-LEVEL CHANGES (SCOPE, SCHEDULE, COST)
This section is a program summary-level discussion of the scope, schedule, and costchanges between the TWRS FY 1998 MYWP (Lenseigne 1997) and the revised RTP planningincluded in the Initial Updated Baseline. This discussion addresses the RTP scope and costsshown in Table 3, Summary Cost Spreadsheet, for "Phase IB Logics." Additional TWRSProject costs related to Phase 1 (for scope not in the Logics) have been included in this InitialUpdated Baseline. For a detailed discussion of these-other costs, refer to the Financial Analysis(Wells 1998).
• The Initial Updated Baseline represents a more thorough analysis of the scope, scheduleand cost than is contained in the FY 1998 MYWP. The RTP planning has benefitted from thesystematic and controlled RTP planning process previously described in Section. 1.0. This
. process has ensured that the higher level mission direction and requirements defined for theTWRS Project have been properly allocated through the technical logics and WBS to the detailedplanning level (executable tasks) for each of the program elements. The RTP planning reflectsdevelopment of mature Level 1 Logics where previously only'preliminary Mid-Level Logicsexisted for the MYWP. The RTP planning also reflects improved scope and interface definitionresulting from the use of the multi-functional, integrated planning teams and preparation of TBRpackages. The basis of estimates are well documented in the TBR packages.
This section is provided to highlight the major changes related to scope, schedule andcosts. Detailed comparisons to the MYWP are of limited value due to the significant RTPadvances in the logic and detailed planning basis. The RTP Initial Updated Baseline will serveas the basis for a change request to revise the MYWP Baseline.
5.1 RETRIEVAL PROJECT
The Retrieval Project has been significantly replanned during RTP for Waste FeedDelivery activities shown on the Level 1 Logics and documented in the TBR packages.Activities for Feed Process System Definition and Retrieval Operations have received enhancedscope definition and planning detail from that shown in the TWRS FY 1998 MYWP(Lenseigne 1997). Extensive changes in these areas resulted in the revised Project MasterBaseline Schedule shown on Figure 8 in Section 3.3. Major changes are as follows:
• Addition of two (2) feed batches to provide adequate LAW Envelope "A" and .HLW Envelope "D" feed to the private contractors. The Envelope "A" feed batchwill be provided from tanks AP-101 and AW-104 and the Envelope "D" batchwill be provided from single-shell tank (SST) C-104 (first tank from the InitialSingle-Shell Tank Retrieval System)
• Planning definition and detail related to sampling and characterization for feeddefinition, process control, and feed qualification
5-1
HNF-1946 Rev. 0
• Planning definition and detail related to Double-Shell Tank (DST) Operations to .deliver Phase 1 LAW and HLW feed batches and receive a solid slurry returnwaste stream back from the private contractors
• Rescoping of Project W-TBD to add two (2) mixer pump retrieval systems intanks SY-101 and SY-103. The AN tanks previously planned will be retrievedwith transfer pumps only
• Validation of the planning for the feed delivery Safety Authorization Basisamendment and addition of resources for RL Tier II and III reviews
• Completion of Project W-454 upgrades
• Numerous activities related to systems definition, design development, and testingfor SSTs, DSTs, mixer pumps and sludge washing.
Schedule changes reflect significant replanning to address the added and deleted workscope as well as the revised logic to support the private contractors' feed delivery schedule. Ingeneral, schedule changes reflect:
• The addition of the new feed batches within the Phase 1 time constraints
• Acceleration of critical activities, as required, to reduce schedule risk and provideslack
Data Quality Objectives workProject W-211 tank specific Functional Design CriteriaProject definition and upgrades work for DST retrieval systems beyondProject W-211.Design concept work for the Initial SST Retrieval System.
The. RTP estimates for Phase 1 reflect an $84 Million increase from the MYWP. Thisincrease is attributable to many factors in the revised planning (additions, deletions, and revised
. schedule). However, the following are two primary contributors: "
• Increase in the Phase 1 DST Retrieval Operations of $40.0 Million. A majority ofthese replanned operations ($47.0 Million) were not costed in the MYWP.
• Approximately $46.0 Million for the additional LAW and HLW feed batchesincluding tank upgrades and operations. •
5-2
HNF-1946 Rev. 0
5.2 IMMOBILIZED WASTE
Based on preparation of Level 1 Logics and associated baseline review and updates thefollowing changes are noted:
• Replanned or added activities to address:Safety Authorization Bases and Environmental Impact StatementSupplemental Analysis (C-2 Analysis)
- • Project Management PlansInternal interface control documentsCompliance with proposed DOE Order 435.1Preparation of Level 1 specifications.for projects
• Updated planning (engineering studies) for Advanced Conceptual Design
• Revisions to correct cost entry errors in the MYWP
• Revision to reflect the Project W-520, Module 1 Facility Decontamination andDecommissioning/Closure as a Phase 2 cost.
The schedule changes reflect work added, deleted, or moved consistent with the Level 1Logics and TBR packages. Significant changes are:
• Acceleration of existing grout vaults closure from FY.2011 to FY 2009
• Waste delisting petition and rulemaking petiton to U.S. Environmental ProtectionAgency shifted out 1 year (previous change requests)
• Additional activities to reflect ILAW project critical path strategy throughcompletion of Operational Readiness Review and Critical Decision 4 by RL.
Overall, the RTP costs for Immobilized Waste is $14.7 Million lower than the MYWP.However, $11.9 Million is due to the movement of the W-520 Module 1 Decontamination andDecommissioning /Closure activities to Phase 2. The balance of the cost delta is due tocorrection of MYWP entry errors and Safety Authorization Basis replanting.
5-3
HNF-1946 Rev. 0
5.3 PRIVATIZATION INFRASTRUCTURE (Phase 1)
Based on preparation of Level 1 Logics and associated baseline review and updates, thefollowing changes are noted.
• Extended Program/Project Management and Administration from FY 2001through FY 2011 (not in MYWP).
• Added and deleted numerous Systems Definition activities (net costdecrease).
• Moved Phase 1 Management and Integration Operations support to thedeactivation Of the private contractors' facilities from Phase 1 to Phase 2 (beyondJune 2011).
• Added costs for training of the private contractors' operators (FY 2001 and.FY 2002) and utilities to support operation of the private contractors' facilities(FY 2003 and FY 2004); these were not funded in the FY 1998 MYWP (belowthe line in the MYWP). \
Schedule changes reflect work added, deleted, or moved consistent with the Level 1Logics and TBR packages. Significant changes are:
• Extension of Program/Project Management and Administration from FY 2001through FY 2011
• Acceleration of waste management definition and feed tank turnover supportingactivities to FY 1998
• Completed operations support (utilities) to the private contractors in June 2011consistent with their plant operations. Utilities to support private contractors'deactivation are a Phase 2 cost.
Overall, the RTP costs for Privatization Infrastructure are $105.7 Million higher than theFY 1998 MYWP. This delta is attributable to scope not funded (below the line) in the MYWPfor the training of private contractors' operators in FY 2001 and FY.2002 and utility costs tosupport operation of the private contractors' facilities in FY 2003 and FY 2004. .
Please note that the RTP estimate for Phase 1 private contractors' operations includes$155.3 Million for liquid effluent processing. Based on a determination that this scope of workis fully funded as part of the Waste Management Program, these costs are not required. A lineitem adjustment in Table 3 under "Retrieval Scope Transfer Shortfalls" is shown to delete.thecosts. • . . . .
5-4
HNF-1946 Rev. 0
6.0 REFERENCES
Department of Energy Orders
DOE Order 435.1 (proposed), Radioactive Waste Management, U.S. Department of Energy,Washington, D.C.
Documents
Acree, C. D., Jr., 1998, Tank Waste Remediation System Mission Analysis Report,HNF-SD-WM-MAR-008, Rev. 2, DRAFT, prepared by Lockheed Martin HanfordCorporation for Fluor Daniel Hanford, Inc., Richland, Washington.
Boston, H. L., and K. N. Jordan, 1998, Tank Waste Remediation System Retrieval and DisposalMission Readiness-to-Proceed Memorandum, HNF-2019, Rev. 0, DRAFT, prepared byLockheed Martin Hanford Corporation for Fluor Daniel Hanford, Inc., Richland,Washington.
DNFSB, 1993, DNFSB Recommendation 93-5 to the Secretary of Energy Regarding HanfordTank Sampling and Characterization, DNFSB 93-5, Defense Nuclear Facility SafetyBoard., Washington, D.C.
Ecology, EPA, and DOE, 1996, Hanford Federal Facility Agreement and Consent Order,2 vols., Washington State Department of Ecology, U.S. Environmental ProtectionAgency, and U.S. Department of Energy, Olympia, Washington.
Freeman, D. V., 1998, Tank Waste Remediation System Program Plan, HNF-1883, Rev. 0,DRAFT, prepared by Lockheed Martin Hanford Corporation for Fluor Daniel Hanford,Inc., Richland, Washington.
Kirkbride, R. A., G. K. Allen, P. J. Certa, A. F. Manuel, R. M. Orme, L. W. Shelton,E. J. Slaathaug, R. S. Wittman, and G. T. MacLean, and D. L. Penwell (SESC), 1997,Tank Waste Remediation System Operation and Utilization Plan, HNF-SD-WM-SP-012,Rev. 0, Volumes I and II, prepared by Numatec Hanford Corporation for Fluor DanielHanford, Inc., Richland, Washington. .
Lenseigne, D. L., 1997, Tank Waste Remediation System Fiscal Year 1998 Multi-Year WorkPlan WBS 1.1, HNF-SP-1230, Rev. 0, prepared by Lockheed Martin Hanford Corporationfor Fluor Daniel Hanford, Inc., Richland, Washington.
6-1
HNF-1946 Rev. 0
Payne, M. A., P. J. Certa, J. O. Honeyman, J. G, Kristofzski, and W. T. Thompson, 1998,Management Assessment of Tank Waste Remediation System Contractor Readiness toProceed With Phase IB Privatization, HNF-2021, Rev. 0, DRAFT, prepared byLockheed Martin Hanford Corporation for Fluor Daniel Hanford, Inc., Richland,Washington. • .
Peck, L. G., 1998, Tank Waste Remediation System Systems Engineering Management Plan,HNF-SD-WM-SEMP-002, Rev. 1, DRAFT, prepared by Lockheed Martin HanfordCorporation for Fluor Daniel Hanford, Inc.,- Richland, Washington.
Treat, R., P. Bartley, T. J. McLaughlin, R. D. Potter, R. E. Raymond, and W. L. Willis, 1998,Tank Waste Remediation System Retrieval and Disposal Mission Technical BaselineSummary Description, HNF-1901, Rev. 0, DRAFT, prepared by. Lockheed Martin •Hanford Corporation for Fluor Daniel Hanford, Inc., Richland, Washington.
Wells, M. W., 1998, Tank Waste Remediation System Retrieval and Disposal Mission Phase 1Financial Analysis, HNF-2017, Rev. 0, DRAFT, prepared by Lockheed Martin HanfordCorporation for Fluor Daniel Hanford, Inc., Richland, Washington.
6-2
HNF-1946 Rev. 0
CONTENTS
LOW-ACTIVITY WASTE FEED LEVEL 1 LOGICS VOLUME
Figure A-l LAW 1st Feed Batches, Tank 241-AN-105 • . 2Figure A-2 LAW 2nd Feed Batches, Tank 241 -AN-104 2Figure A-3 LAW 3rd Feed Batches, Tank 241-AW-lOl 2Figure A-4 LAW 4th Feed Batches, Tank 241-AN-103 • 2Figure A-5 LAW 5th Feed Batches, Tanks 241-AP-101 &241-AW-104 . 2Figure A-6 LAW 6th Feed Batches, Tank 241 -AY-101 2Figure A-7 LAW 7th & 8th Feed Batches, Tank 241-AN-107 . 2Figure A-8 LAW 9th Feed Batches, Tank 241-AN-102 2Figure A-9 LAW 10th Feed Batches, Tank 241-AN-106 .' 2Figure A-10 LAW 1 lth Feed Batches, Tank 241-SY-101 . 2Figure A-l 1 LAW 12th Feed Batches, Tank 241-SY-103 2
HIGH-LEVEL WASTE FEED LEVEL 1 LOGICS
FigureA-12HLW 1st & 2nd Feed Batches, First Tank241-AZ-101 3FigureA-13HLW3rd&4thFeedBatches,FirstTank241-AZ-102 3Figure A-14HLW 5th-9th Feed Batches, 241-AY-102 3
Figure A-15HLW 10th- 12th Feed Batches, Tank 241-C-104 3
IMOBILIZED LOW-ACTIVITY WASTE LEVEL 1 LOGICS
Figure A-l 6 Immobilized Waste ILAW -' . ' ' 3 .
IMMOBILIZED HIGH-LEVEL WASTE LEVEL 1 LOGICS
Figure A-17 Immobilized Waste IHLW . 3
INFRASTRUCTURE PHASE 1 LEVEL 1 LOGICS
Figure A-l 8 Phase 1 Privatization Support 3
A-iii
HNF-1946 Rev. 0
APPENDIX B
GUIDANCE AND REQUIREMENTS TODELIVERABLES CROSSWALK
Tank Waste Remediation System Retrieval and DisposalInitial Updated Baseline Summary
HNF-1946 Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
A.1 DOE Letter to H. J. Hatch, FDH, from. W. J.Taylor, DOE, dated August 8,1997, #9757162A (36ITEM CHECKLIST)
3. Requirements are allocated to functions.
4. Each activity is tied to and necessary to support acontractual requirement.
7. Technical logic are complete at all levels; theprogram makes sense logically; and lower level-logicrolls up properly to higher-level logic.
10. Interface control documents have been prepared,DOE comments have been resolved, issues havebeen addressed, and approved interfaces aremanaged.
11. Waste feed plans and implementing actions andprocedures are on track.
12. Infrastructure support plan and implementingactions and procedures are on track.
13. Immobilized waste product project plans andimplementing actions and procedures are on track.
18. System reliability, availability, andmaintainability have been assessed and are sufficientto support processing rate requirements.
19. The physical integrity of existing systems,structures, and components has been verified.
20. Waste has been characterized as necessary tosatisfy all data quality objectives.
22. Resource-loaded estimates have been completedfor all activities.
23. The critical path is identified and float has beencalculated.
24. Activities have been properly funded.
26. There is agreement among scope, budget, andschedule. The scope of work can be performedwithin budget and on schedule.
32. Environmental permits and safety authorizationbases are in place as required for authorization-to-proceed decision.
Status
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Implementing Location
HNF 1946, Sections 2.1 and 2.4
Complete Document
Sections 1.2,2.1,2.2,2.4,2.5,and 3.3
Sections 1.2,2.4,2.5, and 3.3
Sections 1.2, 2.4,2.5, and 3.3
Sections 1.2, 2.4, 2.5, and 3.3
Sections 1.2, 2.4, 2.5, and 3.3
Sections 1.2,2.4,2.5,3.3
Sections 1.2,2.4, 2.5, 3.3
Sections 1.2,2.4,2.5,3.3
Sections 1.2, 3.3,4.1,4.2,4.3
Section 1.2, 3.2 and 3.3
Section 4.1
Sections 1.1, 1.2, 2.4, 3.3 and 4.3
Sections 1.2, 2.4, 2.5, 3.3
B-l
HNF-1946 Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
A.2 DOE Letter to H. J. Hatch, FDH, from W. J.Taylor, DOE, dated August 8,1997, #9757162A(BODY OF TEXT)
General PHMC Responsibilities from RL's 8/8/97letter, Section 2.1
2. Develop a resource-loaded, logic driven schedule,including critical path
5. Costs and schedules in the programmatic baselinecan be met
6. Critical path analysis is done to determine theimpacts of budget shortfalls on the programmaticbaseline
A.3 DOE Letter H. J. Hatch, FDH, from WilliamJ. Taylor, DOE, dated December 2,1997,#9761291
6 RTP dehverables and their support must addressthe readiness of supporting facilities outside ofTWRS, and understand FDH's readiness to receivesecondary wastes.
7. Establishment of sound technical baseline andupdate M&I TWRS Retrieval Baseline. SubmitLevel 1 logic diagrams and documentation, anidentified critical path, and a listing of documentsthat form the basis for the technical baseline forJanuary RTP.
11. Make a QA plan available for DOE review inJanuary.
b. Address corresponding resources (for the QAimplementing procedures)
B.1 DOE Order 430.1, "Good Practice Guide,"GPG-FM-002
2.2.4 Baseline: Cost Criteria
1. Total Estimated Cost (TEC)
2. Life Cycle Cost (LCC)
2.2.5 Baseline: Schedule Criteria
1. Milestones
2.3.2 Funding Profile
Status
I
I
I
I
I
I
I
I
I
I
Implementing Location
Sections 1.2,2.4, and 3.3
Sections 1.1, 1.2,2.4,3.3,4.3
Sections 3.2 and 3.3
Section 2 6
Sections 1.1,1.2, 2.4 and 3.3 .
Sections 1.2 and 3.0
'<
Sections 1.2,4.1,4.2, and 4.3
Sections 1.2 and 4.0
Sections 3.2,3.3 and 3.4
Section 4.0
B-2
HNF-1946Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
2.3.4 Baseline: Cost Criteria
1. Total Estimated Cost (TEC)
2. Total Project Cost (TPC)
3. Life Cycle Cost (LCC)
2.3.5 Baseline: Schedule Criteria
1. Milestones
2.4.2 Funding Profile
2.4.4 Baseline: Cost Criteria
1. Total Estimated Cost (TEC)
2. Total Project Cost (TPC)
3. Life Cycle Cost (LCC)
2.4.5 Baseline: Schedule Criteria
1. Milestones
2. Master Schedule
3. Thresholds
2.5.4 Baseline: Cost Criteria
1 Life Cycle Cost (LCC)
D.I Detailed Instructions for Assessment of RTP- Appendix C, November 14,1997
2 Provide correct level-1 and mid-level logics andschedules that support the waste feed delivery
3. Provide validatable task duration estimates
4. Provide confirmable critical path and floatactivities not on the path
5. Show the ability to meet the June, 2002 hot start
6. Identify those activities most at risk for meetingthe June, 2002 hot start
10. Show the ability of the PHMC to meet all datesrequired by the private contractors for theinfrastructure.
11. Identify activities most at risk in schedules andlogic diagrams (for infrastructure).
Status
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Implementing Location
Section 1.2,4.1,4.2,4.3
Sections 1.2,4.1,4.2, and 4.3
Sections 1.2 and 4.0
Sections 3.2,3.3, and 3.4
Sections 4.0
Sections 1.2,4.1,4.2 and 4.3
Sections 1.2, 4.1, 4.2, and 4.3
Sections 1.2 and 4.0
Sections 3.2, 3.3, and 3.4
Section 1.2 and 3.3
Refer to HNF-1900 (CM) andWHC-IP-0842, Vol. VIII,Section 1.1, Rev. 0 (ChangeControl).
Sections 1 2 and 4 0
Sections 2 4, 3 2 and 3 3
Sections 1.2, 4.1,4.2, arid 4.3
Sections 3.2 and 3.3
Sections 1.1, 3.2, 3.3, and 4.1
Sections 3.2 and 3.3
Sections 2.4 and 3.3
Sections 3.2 and 3.3
B-3
HNF-1946Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
12. Identify projects that directly supportinfrastructure, based on project plans.
15. Show the PHMC Team's ability to receive, storeand dispose of immobilized LAW and HLW andseparated cesium from private contractor operationsand to take the responsibilities described in thefollowing ICDs:
a. ICD-3 Radioactive Solid Waste
b. ICD-13 Non-Routine High Level Solid Waste
C.ICD-14IHLW Product
d. ICD-15 ILAW Product
e. ICD-17Cs-137 Intermediate Product
16. Show an ability to meet all schedules needed bythe private contractors for receiving immobilizedLAW and HLW and separated cesium.
17. Identify activities most at risk in schedules andlogic diagrams (for ILAW, IHLW, and Cesium)
D.2 Plan for Determining PHMC Team's RTPfor Waste Feed Delivery (Table 2).PHMC provide dehverables necessary to supportRTP, as follows:
7. Schedule Baseline
8. Cost Baseline
33 PHMC Team Work Packages
D.3 Plan for Determining PHMC Team's RTPfor Waste Feed Delivery - Document Checklist(Table 3)
16 Plans support post-closure monitoring from2034 to 2064.
23. Plans are to store separated Tc, entrained HLWsolids, and Sr/TRU products and collect costs of thistransport and storage.
31. Plans are for upgrades to the evaporator neededto extend ops. to 2011 to occur by 2005.
Status
I
I
I
I .
I
I
I
I
I
I
I
I
I
I
Implementing Location
Sections 2.4 and 3.3
Sections 2.4 and 3.3
Sections 2.4 and 3.3
Sections 2.4 and 3.3
Sections 2.4 and 3.3
Sections 2.4 and 3.3
Sections 2.4 and 3.3 .
Sections 3.2 and 3.3
Sections 1.2,2.4 and 3.3
Section 4.0
Section 1.2. 3 3 and 4 3
Not applicable to Phase 1 RTP.
Section 2.4, 3.3, 4.1 and 4.3
Sections 4.1 and 4.2.6 (NOTE:Evaporator Funded by WasteManagement
B-4
HNF-1946 Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
58. Plans describe reassessing the timing and needsfor procurement of additional mixer pumps forDSTs, considering the need dates and availability ofadvanced mixer-pump designs.
D.5 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery
3. Provide vahdatable task duration estimates..
4. Provide confirmable critical path and floatactivities not on the path
5 Show the ability to meet the June, 2002 hot start
D.7 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery, AppendixB, Programmatic Baseline Checklist.
30 Indicate that the Infrastructure Level-1 Logic isconsistent with the CDR schedules, the feed deliveryschedules, the Privatization Contractor's schedules,and other appropriate interface schedules.(2.1.1-2.1.3)
32. Indicate that the WBS is accurate and consistentwith the MYWP. (2.3.1-2.3.2)
34. Show that the critical path contains schedulecontingency. (2.4.3)
38. Provide the Critical Path Diagram Schedule(CPDS) (4 1 4)
D.8 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery, AppendixC, Infrastructure (Management Baseline)Checklist.
40 Identify the manager assigned to each costaccount. (1.1.9)
42. Confirm the Project and SEMP execution plansare to be developed (1.2.4; 1.2.7)
47. Indicate that support is planned/budgeted for RLpreparation of NEPA docs. (1.3.5)
D.9 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery, Appendix,D, Feed Tank/Air Emissions (Technical BaselineChecklist).
Status
I
I
I
I
I
I
I
I
I
I
I
Implementing Location
Section 3.3
Sections 1.2,4.1,4.2, and 4.3
Sections 3.2 and 3.3
Sections 1 1, 3 2, 3 3, and 4 1
Section 1 2, 2 4, 3 2, and 3 3
Sections 2.2 and 2.5
Section 2.4, 3.2, and 3.3 (ForProjects)
Section 2.4, 3.2, and 3.3
Sections 1 2 and 2 4 (Referenceto TBRs)
The execution plans will bedeveloped as needed
Sections 1.2, 3.3, and 4.3
B-5
HNF-1946Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
59. Show requirements are allocated to functions inthe HSTB and Multi Year Work Plan (MYWP).
D.10 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery, AppendixE, Infrastructure Feed Tank Transfer(Programmatic Baseline) Checklist.
74. Indicate that the Infrastructure Level-1 Logic isconsistent with the CDR schedules, the feed deliveryschedules, the Privatization Contractor's schedules,and other appropriate interface schedules.(2.1.1-2.1,3)
76. Indicate that the WBS is accurate and consistentwith the MYWP. (2.3.1-2.3.2)
78. Show that the critical path contains schedulecontingency. (2.4.3)
82. Provide the Critical Path Diagram Schedule(CPDS) (4 1 4)
D.ll Draft Plan for Determining RTP for N
Infrastructure & Byproducts Delivery, AppendixE, Infrastructure Feed Tank Transfer(Management Baseline) Checklist.
84. Identify the manager assigned to each costaccount. (1.1.9)
86. Confirm the Project and SEMP execution plansare to be developed. (1.2.4; 1.2.7)
91 Indicate that support is planned/budgeted for RLpreparation of NEPA docs (13 5)
E.I TWRS Waste Disposal Division PlanningGuidance dated July 7,1997 (Updated December12,1997)
Develop a logic-based, resource loaded schedule
Mandatory completion of approved TPA milestones.
Baseline schedule for Retrieval will he a subset ofthe TWRS Project Master Baseline Schedule.
Interfaces between elements and external interfacesmust be represented in the PBMS (of which WDDbaseline schedule is a subset).
Status
I
I
I
I
I
I
• I
I
I
I
I
I
Implementing Location
Sections 2.1 and 2.4
-
Sections 1.2,2.4, 3.2, and 3.3
Sections 2.2 and 2.5
Sections 2.4, 3.2, and 3.3 (ForProjects)
Sections 2.4, 3.2 and 3.3
' / -, , - ^ ' - N
' <- V
Sections 1.2 and 2.4 (Referenceto TBRs)
The execution plans will bedeveloped as needed
Sections 1 2, 3 3, and 4 3, alsosee HNF-1733, Appendix A
Sections 1 2, 3 2, and 3 3
Sections 3.2,3.3, and 3.4
Sections 1.2 and 3.3
Sections 1.2 and 3.3
B-6
HNF-1946 Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
Use the Phase 1 and 2 schedules to establish theWDD schedule.
Establish all detailed schedule, consistent withTWRS Level 1 logic.
Use a code field to facilitate roll-up of detailedschedules to TWRS Level 1 and to Level 0.
Changes to Levels 1 and 0 resulting from roll-upmust be put into MYWP.
Plan WDD at greatest detail in CY, less in next two(but sufficient, for logic-driven cost), less in next 7,and sufficient detail beyond ten to define baseline forentire project.
Add sufficient detail in schedules to define criticalpath and logical sequences.
Prepared detailed planning describing work scope,schedule, milestones and budget to complete workscope.
Financial staff must define task package controlnumbers which allow for proper collection of costsby schedule activity.
Waste Retrieval Project will plan for the 10 Phase 1items in paragraph 3.2.1.
Waste Retrieval Project will assume the 11 items inparagraph 3.2.2.
Waste Feed Delivery will define feed process andretrieval systems, integrate the waste feed delivery .technical baseline and define Retrieval Projectrequirements to interface with HTI and other EM-50funded projects.
Complete LAW feed definition, staging plans,process flowsheets.
Status
I
I
I
I
I
I
I
I .
I
I
I
I
Implementing Location
Sections 3.2 for Phase 1; Phase 2not covered in RTP schedules
Sections 1.2,2:4 and 3.3
Sections 1.2, 3.2, and 3.3
Section 1.1 (A CR to theMYWP-Baseline must be •processed)
Section 3.3
Section 3.2 and 3.3
Sections 1.0, 2.0, 3.0, and 4.0
Section 3.0'
Sections 1.2,2.0, 3.0, and 4.0
Sections 1.2, 2.0, 3.0, and 4.0;However, not all items are met,nor are they Phase 1
Sections 2.2, 2.4, 3.3, 4.2, and4.3; also see HNF 1901 andHNF-1881
Sections 2.2,2.4, 3.3,4.2, and4.3; also see HNF 1901 andHNF-1881
B-7
HNF-1946 Rev. 0
Table B-l. Tank Waste Remediation System Retrieval and Disposal MissionInitial Updated Baseline Summary.
Guidance or Requirement
Include M&I and Vendor Interface funding and workscope for Phases 1 and 2 in Process Waste SupportPBS. .
Show scope and schedule for WIT and PHMC in theWDD plans.
Status
I
I
Implementing Location
Section 2.2
Sections 2.1,3.2, and 3.3 (FullWIT Schedule is not shown inPHMC Team Schedule)
B-8
HNF-1946 Rev. 0
APPENDIX C
GUIDANCE AND REQUIREMENTS TODELIVERABLES CROSSWALK
Level 0 and Level 1 Logics
C-i
HNF-1946 Rev. 0
Table C-l. Guidance and Requirements to Deliverables Crosswalk - Level 0 and Level 1 Logics.
Guidance or Requirement
A.1 DOE Letter to H. J. Hatch, FDH, from W. J.Taylor, DOE, dated August 8,1997, #9757162A(36 ITEM CHECKLIST)
7. Technical logic are complete at all levels; theprogram makes sense logically; and lower level-logicrolls up properly to higher-level logic.
A.2 DOE Letter to H. J. Hatch, FDH, fromW. J. Taylor, DOE, dated August 8,1997,#9757162A (BODY OF TEXT)
General PHMC Responsibilities from RL's 8/8/97letter, Section 2.1
2. Develop a resource-loaded, logic driven schedule,including critical path
A.3 DOE Letter H. J. Hatch, FDH, from William XTaylor, DOE, dated December 2,1997, #9761291
1. Describe how the PHMC Team will assess theirreadiness.
2. Describe how the PHMC Team will demonstratetheir readiness.
7. Establishment of sound technical baseline andupdate M&I TWRS Retrieval Baseline. Submit level1 logic diagrams and documentation, an identifiedcritical path, and a listing of documents that form the .basis for the technical baseline for January RTP.
D.I Detailed Instructions for Assessment of RTP -Appendix C, November 14,19972 Provide correct level-1 and mid-level logics andschedules that support the waste feed delivery.-
5. Show the ability to meet the June, 2002 hot start
11. Identify activities most at risk in schedules andlogic diagrams (for infrastructure).
17. Identify activities most at risk in schedules andlogic diagrams (for ILAW, IHLW, and Cesium).
Status
I *
I
I
I
I
;
i
i
i .
i
Implementing Location
All plus Level 0 Logic and subactivitylogics in TBR Packages
All plus detailed schedule and TBRPackages
All
All
All
All H-2-829151 through H-2-829165(L-l), H-2-829166 (L-0)
H-2-829151 (AN-105), H-2-829152(AN-104), H-2-829162 (AZ-101),H-2-829148 (ILAW), H-2-829149(IHLW), and H-2-829150(Infrastructure)
H-2-829150 (Infrastructure)
H-2-829148 (ILAW) and H-2-829149(IHLW)
C-l
HNF-1946 Rev. 0
Table C-l.. Guidance and Requirements to Deliverables Crosswalk - Level 0 and Level 1 Logics.
Guidance or Requirement
D.2 Plan for Determining PHMC-Team's RTP forWaste Feed Delivery (Table 2).
PHMC provide deliverables necessary to support RTP,as follows:
4. Level 0/1 Logic
13. Multi-level Logic for RTP. Package
D.5 Draft Plan for Determining RTP for .Infrastructure & Byproducts Delivery'
2. Provide correct level-1 and Level 0 logics andschedules that support the infrastructure support
D.7 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery, Appendix B,Programmatic Baseline Checklist.
28. Indicate that all activities on logic diagrams aretiered from contractual or MAR requirements. (1.1.1)
29. Indicate that activities needed to supportprivatization are defined in Level-1 Logic. (1.1.2)
30. Indicate that the Infrastructure Level-1 Logic isconsistent with the CDR schedules, the feed deliveryschedules, the Privatization Contractor's schedules, andother appropriate interface schedules. (2 1.1-2.1.3)
D.10 Draft Plan for Determining RTP forInfrastructure & Byproducts Delivery, Appendix E,Infrastructure Feed Tank Transfer (ProgrammaticBaseline) Checklist.
72 Indicate that all activities on logic diagrams aretiered from contiactual or MAR requirements (1.1.1)
73. Indicate that activities needed to supportprivatization are defined in Level-1 Logic. (1.1.2)
74. Indicate that the Infrastructure Level-1 Logic isconsistent with the CDR schedules, the feed deliveryschedules, the Privatization Contractor's schedules, andother appropriate interface schedules. (2.1.1-2.1.3)
Status
I
I
I
I
I
I
•
I
I
I
Implementing Location
All
All
H-2-829150 (L-l) and H-2-829166(L-0)
1
H-2-829150
All
H-2-829150
H-2-829151
H-2-829151
H-2-829151
C-2
HNF-1946 Rev. 0
Table C-l. Guidance and Requirements to Deliverables Crosswalk - Level 0 and Level 1 Logics.
Guidance or Requirement
E.1 TWRS Waste Disposal Division PlanningGuidance dated July 7,1997 (Updated December12,1997)
Establish logic between retiieval, waste proc,infrastructure, and immobilized tank waste storage anddisposal projects.
Ensure logic between privatized and non-priv.activities through added detail.
Prepared detailed planning describing work Scope,schedule, milestones and budget to complete workscope.
Status
I
I
I
Implementing Location
H-2-829166 (Level-0 Logic)
All
All
C-3
HNF-1946Volume 2
Rev. 0UC-51O
Tank Waste Remediation SystemRetrieval and Disposal MissionInitial Updated Baseline SummaryLevel 1 Logics
W. R. SwitaM. R. LewisLockheed Martin Hanford Corporation
M. J. O'NeillMACTEC
Date PublishedJanuary 1998
Prepared by Lockheed Martin Hanford CorporationRichland, Washington •
Prepared for the U.S. Department of Energy
Fluor Daniel Hanford, Inc.P.O. Box 1000.Richland, Washington
Hanford Management and Integration Contractor for theU.S. Department of Energy under Contract DE-AC-O696-RL13200
Approved for Public Release; Further Dissemination Unlimited
HNF-1946 Rev. 0
Volume 2
LEGAL DISCLAIMER •. ,This report was prepared as an account of work sponsored byan agency of the United States Government. Neither theUnited States Government nor any agency thereof, nor any oftheir employees, nor any of their contractors, subcontractorsor their employees, makes any warranty, express or implied,or assumes any legal liability or responsibility for theaccuracy, completeness, or any third party's use or the resultsof such use of any information, apparatus, product, or processdisclosed, or represents that its use would not infringeprivately owned rights. Reference herein to any specificcommercial product, process, or service by trade name,trademark, manufacturer, or otherwise, does not necessarilyconstitute or imply its endorsement, recommendation, or
• favoring by the United States Government or any agencythereof or its contractors or subcontractors. The views andopinions of authors expressed herein do not necessarily stateor reflect those of the United States Government or anyagency thereof.
This report has been reproduced from the best available copy.Available in paper copy and microfiche.
Available to the U.S. Department of Energy ;
and its contractors fromU.S. Department of EnergyOffice of Scientific and Technical Information (OSTI)P.O. Box 62Oak Ridge, TN 37831(615)576-8401
Available to the public from the U.S. Department of CommerceNational Technical Information Service (NTIS).5285 Port Royal RoadSpringfield, VA 22161 •(703) 487-4650
Printed in the United States of America
DISCLM-1.CHP(S-95)
I HNF-1946Rev. 0
VOliUME 2 LEVEL 1 LOGICS
LOW-ACTIVITY WASTE FEED LEVEL 1 LOGICS
Figure A-l LAW 1st Feed Batches, Tank 241-AN-105
Figure A-2 LAW 2nd Feed Batches, Tank 241-AN-104Figure A-3 LAW 3rd Feed Batches, Tank 241-AW-101Figure A-4 LAW 4th Feed Batches, Tank 241-AN-103Figure A-5 LAW 5th Feed Batches, Tanks 241-AP-101 & 241-AW-104Figure A-6 LAW 6th Feed Batches, Tank 241-AY-101Figure A-7 LAW 7th & 8th Feed Batches, Tank 241-AN-107Figure A-8 LAW 9th Feed Batches, Tank 241-AN-102Figure A-9 LAW 10th Feed Batches, Tank 241-AN-106
Waste Feed DeliveryLAW 1st Feed Batches
Tank241-AN-105
This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution timeTime for planning and reporting is not included.See the detailed program schedule for full details.
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
LAW 1st Feed BatchesTank241-AN-105
r t,1.
Waste Feed DeliveryLAW 2nd Feed Batches
Tank 241-AN-104
Ssr f —
. , > • ;
- , - r ,%
V
I—wi
Completion of "Denver fuedto 2+1-AP-106 and to 241AP-10K11 for 1st Batch
KEY:Lxjgic Tics on Hit Same Figure
Formal DOE rc-evaluations pointsfor TWR.S Program called out in
A, TWRS EIS ROD
T T 7 Prior to Phase 1 hot operation?.
"C" "?* Prior to decision to proceed with Phase 2.
OWNERS
-Si^Xd^SMiSa^ ^U^i^K-SffiS
• Activities ihat have :: a gmy background :I have been grouped :• together for :
DWG NO
DRAWING TRACEABIUTY LIST
DRAWING LIST
REFERENCES
NEXT USED ON
NOTF.S •
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
HNF-1946 Rev. 0
Figure A-2
REVISIONS
CAD FILE LW2 1219.CVS CADCODE
M.J. O'Neill
T.W. Crawford
W.M. Funderburte
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 Logic
Waste Feed Delivery
LAW 2nd Feed Batches
Tank 241-AN-104
I 2 820152 1-5-18
'••*« *+l*.
.' J
it
Waste Feed DeliveryLAW 3rd Feed Batches
Tank 241-AW-101
KEY:
Formal DOE re-evaluations pointsfor TWRS Program called out in
yy TWRS EIS ROD
^ly" Frior to proceeding wilh Phase lb,
Y T7 Prior *o Phase 1 lint operations.
DNFSB MS K
9/1997
-I
NOTF.S :
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
HNF-1946 Rev. 0Figure A-3
T.W. Crawford
R.L Treat
M i , Lee
M.J. O'NeilU.S. DEPARTMENT OF ENERGY
Richland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
LAW 3rd Feed BatchesTank 241-AW-101
'» t i1
•lift" •«
Waste Feed DeliveryLAW 5th Feed Batches
Tanks 241-AP-101 & 241-AW-104
NOTFS1 •
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
Formal DOE re-evaluations pointsfor TWRS Program called out in
TWRS EIS RODPrior lo proceeding with Phase
"^72^" Prior to P
"v-jj?1 Prior lo de
OWNERS
HNF-1946 Re7. 0Figure A-5
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
LAW 5th Feed BatchesTanks 241-AP-101 & 241-AW-104
CADFILE LW5_1219.cvsDRAWING TRACEABILITY LIST
% 4
"7 T~ ,t~
~ 3
* * * • ^ - _ ^ - ^
Waste Feed DeliveryLAW 4th Feed Batches
Tank 241-AN-103
NOTFS•
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
I •«• BHT IH
KEY:
Formal DOE re-evaluations poialsfor TWRS Program called out in
/, TWJiB HIS ROD"*y rp* Prior to proceeding with Phase Jb.
to Phase 1 hot operations.'=T2~^'P
K^y Prior to decision to proceed with Phase 2.
OWNERS have been grouped
HNF-1946 Rev. 0
Figure A-4
DRAWING TRACEABILITY LIST
REF NUMBER
DRAWING LIST
TITLE
REFERENCES
NEXT USED ON
REVISIONS
CAD FILE LW4 1219.CVS
M.J. O'Neill
T.W. Crawford
U.S. DEPARTMENT OF ENERGYRichland Operations Office
. LOCKHEED MARTIN
R.L. Treat
W.M. Funderburke
TWRS Retrieval Level 1 Logic
Waste Feed Delivery
LAW 4th Feed Batches
Tank241-AN-103
-r-til
* i
- J~ *
— - «l "- ' *
PERT Box Number,
Oblain241-AY-101 Sampper Poteniial LAW Feci
DQO & Confirm
DQO
HLW-2 Obtain Core SamplerAZ-102
- DQO for confiimir^ ft=d from241-nuw_lank meets LAW Batch
Update BBI&TCE fur J
KEY:Logic Ties on the Same Figure
Logic Ties to Diilbrenl FigureTo PERT Box „ ^ . From PERT Box
Formal DOE re-evaluations pointsfor TWRS Program called out in
/y TWRS EIS ROD" Prior to proceeding with Phase lb.
DNFSB MS 92-4#2
9/1997
2 7 P r i o r to Phase 1 hot operations.PA
"NsV7" P r i° r t o decision to proceed with Phaa
OWNERSActivities that havea grey backgroundhave been grouped
itogether for discussioi
CRITICAL PATH 0-60 DAYS FLOAT
Waste Feed DeliveryLAW 6th Feed Batches
Tank 241-AY-101
NOTFS
This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
^amp[e and Analyze Tiink
Bootstrap TransferTanks
241-AZ-101
Completion of "Deliver feedto 241-AP-1O6" for Sth Ratcri
150r j ]^j ,^perai-in
Adjust TankFeed m 241 \t Kit
1 month
Mi> Tsnl 41 W HI Fee.
Qualification Samples Hum
Samples From 241 -AP-102 to
compliance with t
Analyze Tank 241- 1 0
- Establish MT No, En pe
and Official Compo. t n
(Allow solids to se t neede
2 months
1 5 |
F deTank241-AY-101 Feed
"KfT Envelope and Official
2 weeks
Deliver Tank 241-AY-10
15Q.K35
Ready for delivery of ne of feed to 241-AP-106
Completion of "Deliver feedto 241-AP-I08" for 5thBatch
into 241-AP-104
' I30.K40 )
ifitnagijtHwr
FT
rr
Retrieval
onk 241-AY-101 Veal
2 weeks
HNF-1946 Rev. 0
Figure A-6
DRAWING TRACEABILITY LIST
REF NUMBER
DRAWING LIST"
REFERENCES
NEXT USED ON CADFILE LW6 1219.CVS
M.L. Lee
M.J. O'Neill
T.W. Crawford
R.L. Treat
W.M.FUNDERBURKE
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 Logic
Waste Feed Delivery
LAW 6th Feed Batches
Tank241-AY-101
4
I 2 820166. t - V »
__ -Lki'. _*r
Waste Feed DeliveryLAW 7th & 8th Feed Batches
Tank 241-AN-107
NOTFS •
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
Enabling Assumption
TWRS assumes it is acceptable to pre-qualify this feed in SourceTank to support PC's Feed Delivery requirements/Sodium Assaydetermined by Mass Balance
KEY:
Formal DOE re-evaluations pointsfor TWRS Program called out in
/i TWRS EIS RODV | 7 Prior to proceeding with Phase lb.
TTXV'Priorto Phase 1 hot operations.
A• ^ ^ M t deiaiontop edw'IPhas
OWNERS
Logic Ties on ihe Same Figure
DWG NO
DRAWING TRACEABILITY LIST
DRAWING LIST
REF NUMBER TITLE
REFERENCES
NEXT USED ON
REVISIONS
CAD FILE LW781219.CVS
M J . O'Neill
T.W. Crawford
W.M. Funderburke
HNF-1946 Rev. 0Figure A-7
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
LAW 7th & 8th Feed BatchesTank241-AN-107
1-2-820157' \-S-Vb
Waste Feed DeliveryLAW 9th Feed Batches
Tank 241-AN-102
NOTRS:
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
KEY:
Formal DOE re-evaluations pointsfor TWRS Program called out in
/, TWRS EIS ROD
*v ]_ / I'nor to proceeding vvitli Pliflst lb.
TrZ2s' Prior to Phase 1 hot operations.
v 3 / Pnoi" to decision to inocced with Plm
OWNERS
DNFSBMS92-4
9.1997
DWG NO TITLE
DRAWING TRACEABILITY LIST
DRAWING LIST
TITLE
REFERENCES
NEXT USED ON CADFILE LW9 1219.cvs CADCODE
HNF-1946 Rev. 0
Figure A-8
|D«,WNBY M .L . Lee
1E»8, M . J . O'Neill
OHECKID T . W . Crawford
fc^TW.M. Funderburke
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 Logic
Waste Feed Deliver)'
LAW 9th Feed Batches
Tank 241-AN-102
2 820158.11 2 830
<*•„*. ; £
4
3 : ^ ;
Waste Feed DeliveryLAW 10th Feed Batches
Tank-241-AN-106
NOTFS•
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
USQ Process &.licensing Strategy
Acquisition Strategy
to 241-AP-106" for 8th Botch
' S » a e n g t i ' ' n ^ ^
Feed
lttnidi
Feel
1ID to.
KEY:ic Ties on the Sjinie Figure
I15U.B44 15C
Logic Ties to Different Figure
-, From PERT Bos
Formal DOE re-evakiations pointsfor TWRS Program called out in
A TWRS EIS ROD• d ^ Prior » proceeding wittt Phase lb.
~*Z~2 {* Prior to Phase 1 hot operations.
^-4S? Prior to decision to proceed with Phase 2.
OWNERS
• Nuclcir Safety
DNF3B MS 92-4
: : : : : : : Activities that have ::: ; : i ; : ; agreybac^round \];;•:•:: have been grouped :'•:'•]'.'•'.-together for discussion:
HNF-1946 Rev. 0
Figure A-9
DWG NO TITLE
DRAWING TRACEABILITY LIST
DRAWING LIST \»FD
TITLE
REFERENCES
NEXT USED ON
REVISIONS
CAD FILE LW101219.CVS CADCODE
M.J. O'Neill
T.W. Crawford
W.M. Funderburke
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 Logic
Waste Feed Delivery
LAW 10th Feed Batches
Tank-241-AN-106
11-2*020109- ,.-;.«*
-3""
/ r \ '
•AS -i;
ttJ-r^Lj- -
i
Waste Feed DeliveryLAW 11th Feed Batches
Tank 241-SY-101
MrforlMlDm/'
Acquisilion Strateg\r
KEY:Logic Ties on the Same Figure
Formal DOE re-evaluations pointfor TWRS Program called out in
TWRS EIS ROD
Tv2"x1 Prior to Phase 1 hot operations.
*Z~3 -7 Prior to decision to proceed with Phase 2.
OWNER
DXFSB US 92-4
9/1997
'^r
: : : : : : ' Activities that have' : : : : : : a giey background;:::: \: have been grouped• 1 •: • i : together for discussion
—»-( 150B22)
.Ml1 .f-T. <i
DWG NO
DRAWING TRACEABILITY LIST
DRAWING LIST
REF NUMBER
REFERENCES
NEXT USED ON
NOTFS:
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
2. Retrieval of Tanks 24 l-SY-101 and241-SY-102is schedule driven by the need to empty these
DST's in West Area as Receiver Tanks for SingleShell Tank Retrieval
11
MA
TC
HLIN
E -
SE
E T
HIS
DR
AW
ING
11i
1
„„,„,,
5dSV!
r-g»gjvevf^^
HNF-1946 Rev. 0
Figure A-10
M.L Lee
M.J. O'Neil
REVISIONS
CAD FILE LW111219.0VS CADCODE
T.W. Crawford
W.M. Funderburke
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
Retrieval Level 1 Logic
Waste Feed Delivery
LAW 11th Feed Batches
Tank241-SY-101
¥1-2-029100 I.S-!
¥**<-
Waste Feed DeliveryLAW 12th Feed Batches
Tank 241-SY-103
NOTFS :
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
2. Retrieval of Tank 241-SY-103 is schedule drivenby the need to empty this DST in West Areaas Receiver Tanks for Single Shell TankRetrieval.
Irtnuft. >B«k
si 1
- . ' „ „ •
1
I•
I
•
iii
f!i
•
1:
1
Qiu!illEatl«i!ta]j]]a fruit
is
KEY:
Formal DOE re-evaluations pointsfor TWRS Program called out in
A TWRS ETS ROD
^ T l V Prior to proceediig with Phase 1b.
<4Vprior(o Plisse J hot operations.
DNfSB MS 92-4 4-a grey backgroundhive been s-ouptd
together for disLUS'uoit
DWG NO TITLE
DRAWING TRACEABILITY LIST
111•
w f^^msmzzm
DRAWING LIST
REF NUMBER TITLE
REFERENCES
NEXT USED ON
REVISIONS
CADFILE LW1212I9.CVS ICADCODE
M.L Lee
M.J. O'Neill
T.W. Crawford
R.L. Treat
HNF-1946 Rev. 0
Figure A-11
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
:F ENGINEER W .M . Fundsrburke
TWRS Retrieval Level 1 Logic
Waste Feed Delivery
LAW 12th Feed Batches
Tank241-SY-103
H-2-029104- ,.5-f
WASTE FEED DELIVERYHLW 1st & 2nd Feed Batches
First Tank, 241-AZ-101
>«ibrSm*lii«
"Fn*"Control"
4nmnth.11
DerelopDrS
ae^ntmn
3JIH
NOTES :
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
H.01.08 | HOMO 1
Dsitlop Mixtr Pun* Tc^tffca
^ i™u,
Formal DOE re-evaluations pointsfor TWRS Program called out in
TWRS EIS ROD
• C T 7 Prior to proceeding with Phase lb.
\ ' 2 y Prior to Phase 1 hoi operations.
OWNERS
KEY:
Logic Ties on the Same
CRTHCAL PATH 0-60 DAYS FLOAT
Activity # 160.A18 "TWRS MANAGEMENT ASSESSMENT"is an overall review of preparations to successfully supply waste feedon a continuing basis. It is anticipated this review will look at the tankfarms infrastnicture to assure transfer systems are complete and ready toperform reliably, qualified Operations, Engineering, Maintenance,and Laboratory Organizations are adequately staffed; and processesand procedures are in place. Also, construction projects required tosupport rmntinnjng delivery of waste feed (W-211 mixer pumps andtransfer systems) are progressing adequately. An overall readinessassessment strategy for feed delivery is being developed.. The scopeof all readiness review type activities is being considered.
DWG NO TITLE
DRAWING TRACEABILITY LIST
REF NUMBER
DRAWING LIST
TITLE
REFERENCES
NEXT USED ON
REVISIONS
CADFILE HW1 1219.CVS CADCODE
DRAWN BY M.L. Lee
T.W. Crawford
M.J. O'Neil
R.L. Trent
W.M. Funderbur
HNF-1946 Rev. 0Figure A-12
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
HLW 1st & 2nd Feed Batches. First Tank, 241-AZ-101
I-2-829102- ,-s-1»
Waste Feed DeliveryHLW 3rd-4th Feed BatchesSecond Tank, 241-AZ-102
From LAW MlctLevel Logic, Sbt 1
Formal DOE re-evaluations pointsfor TWRS Program called out in
TWRS EIS ROD
1 Prior ID proceeding with Phase lb.
Prior to Phase I hot operations,t
AddSMnnbg Oieaicih sntfw
y Second HLW Sludge Tank
«n Dtttvoy of Pint HLW Skulp ! •
KEY:Logic Ties on the Same Figure
J 150.B44J 1150.B44 ^
Logic Ties to Different Figureitdflnia am To PERT Bos
DNFSB MS 92-4
iAeihitieVthatbave \\\\\\l:• a grey background : : : : : : : ": have been grouped [-:'•:'-:'-ilogeaier for scusaioni: ;i i: i:
CRITICAL PATH 0-60 DAYS FLOAT
DWG NO TITLE
DRAWING TRACEABIUTY LIST
REFNUMBER
DRAWING LIST
REFERENCES
NEXT USED ON
NOTFS •
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
HNF-1946 Rev. 0Figure A-13
REVISIONS
CADFILE H W 2 1219.CVS CADCODE
M.L. Lee
T.W. Crawford
M.J. O'Neill
i W.M. Funderburke
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
HLW 3rd-4th Feed BatchesSecond Tank, 241-AZ-102
-H-2-029163-
^r ~Ji *r
%—.zs^
pi
h> - .-.=« *
1 . - V
I" •'
5 "_T
'.-. '''<-
^t,
Waste Feed DeliveryHLW 5th-9th Feed BatchesThird Tank, 241-AY-102
NOTF.S •
1. This logic is a summary7 representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.rime for planning and reporting is not included.See the detailed program schedule for full details.
KEY:
eptPDilTtrcningmi
Formal DOE revaluations pcitifor TWRS Program called out i
TWRS HIS ROD
^\J\~p"Prior lu proceeding v/ilh Pliast 1
i Rlik \I PUHl '
_ - - _ _ _ _
1 _.. . ._ . _ . . . . ._.... . _. .... - - -
[ DWG NO TITLE
j DRAWING TRACEABILITY LIST
9 8 1
1 'DRAWING LIST
j ' REFERENCES
JNEXTUSEDON
7 6
J
j ... : «»]'"•' ," '| CADFILE HW3 1219.cvs
5
REVISIONS
CADCODE
!
raw.,, M L . Lee
™«» T.W. Crawford
=".c.!D M.J. O'Neill
.,O=-«AM«N.»E« R.L. Treat '
e n . EISNEB, W.M. Funderburke
• - - : : r c
i_
HNF-1946 Rev. 1)Figure A-14
U.S. DEPARTMENT OF ENERGYRichland Operations Office
_ JPCKHEED MARTIN __ _
TWRS Retrieval Level 1 LogicWaste Feed Delivery
HLW 5fh-9th Feed BatchesThird Tank, 241-AY-102
E » T IHErT 0 .
2 1
-: : i
* ? *
11
L
Waste Feed DeliveryHLW 10th-12th Feed Batches
Fourth Tank, 241-C-104
NOTKS •
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
-•£•. T~
-a. t
KEY:
Formal DOE re-evaluations pointsfor TWRS Program called out in
TWRS EIS ROD
^ ^ Prior to proceeding with Phase lb.
" v § 7 Prior to Phase 1 hot operations.
OWNERS
Logic Ties on the Same Figure
. - 1 K " P E R T B
DNFSBMS92-4
CRITICAL PATH (WO DAYS FLOAT
DWG NO TITLE
DRAWING TRACEABILITV LIST
8
REFNUMBER
DRAWING LIST
TITLE
REFERENCES
NEXT USED ON
REVISIONS
CADFILE HW4_1219.cvs CADCOOE
M.L. Lee
T.W. Crawford
M j O'Neill
HOQR*U MANAGER R.L . T r e a t
W.M. Funderburke
HNF-1946 Rev. 0Figure A-15
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicWaste Feed Delivery
HLW 10th-12th Feed BatchesFourth Tank, 241-C-104
•H 3 8 2 0 1 6 5 . ^ . ^
HNF-1946Volume 3
Rev. 0UC-510
Tank Waste Remediation SystemRetrieval and Disposal MissionInitial Updated Baseline SummaryLevel 1 Logics
W. R. SwitaM. R. LewisLockheed Martin Hanford Corporation
M. J. O'NeillMACTEC
. Date Published
January 1998
Prepared by Lockheed Martin Hanford CorporationRichland, Washington
Prepared for the U.S. Department of Energy
ir-. Fluor Daniel Hanford, Inc.O f P.O. Box 1000"^ Richland, Washington
Hanford Management and Integration Contractor for theU.S. Department of Energy under Contract DE-AC-0696-RL13200
Approved for Public Release; Further Dissemination Unlimited
HNF-1946 Rev, 0
• Volume 3
LEGAL DISCLAIMER '. _ _This report was prepared as an account of work sponsored byan agency of the United States Government. Neither theUnited States Government nor any agency thereof, nor any oftheir employees, nor any of their contractors, subcontractorsor their employees, makes any warranty, express or implied,or assumes any legal liability or responsibility for theaccuracy, completeness, or any third party's use or the resultsof such use of any information, apparatus, product, or' processdisclosed, or represents that its use would not infringeprivately owned rights. Reference herein to any specificcommercial product, process, or service by trade name,trademark, manufacturer, or otherwise, does not necessarilyconstitute or imply its endorsement, recommendation, orfavoring by the United States Government or any agencythereof or its contractors or subcontractors. The views andopinions of authors expressed herein do not necessarily stateor reflect those of the United States Government or anyagency thereof.
This report has been reproduced from the best available copy.Available in paper copy and microfiche.
Available to the U.S. Department of Energyand its contractors fromU.S. Department of EnergyOffice of Scientific and Technical Information (OSTI)P.O. Box 62Oak Ridge, f N 37831(615)576-8401
Available to the public from the U.S. Department of CommerceNational Technical Information Service (NTIS)5285 Port Royal Road •Springfield, VA 22161(703) 487-4650
Printsd in the United States of America .
DISCLM-1.CHP(8-95)
11
HNF-19.46 Rev. 0
VOLUME 3 LEVEL 1 LOGICS
LOW-ACTIVITY WASTE FEED LEVEL 1 LOGICS
Figure A-10 LAW 1 lth Feed Batches, Tank 241-SY-101Figure A-l 1 LAW 12th Feed Batches, Tank 241-SY-103
HIGH-LEVEL WASTE FEED LEVEL 1 LOGICS
Figure A-12 HLW 1st & 2nd Feed Batches, First Tank 241-AZ-101Figure A-13 HLW 3rd & 4th Feed Batches, First Tank 241-AZ-102Figure A-14 HLW 5th - 9th Feed Batches, 241-AY-102Figure A-15 HLW 10th - 12th Feed Batches, Tank 241-C-104
IMMOBILIZED LOW-ACTIVITY WASTE LEVEL 1 LOGICS
Figure A-16 Immobilized Waste ILAW
IMMOBILIZED HIGH-LEVEL WASTE LEVEL 1 LOGICS
Figure A-17 Immobilized Waste IHLW
INFRASTRUCTURE PHASE.1 LEVEL 1 LOGICS
Figure A-18 Phase 1 Privatization Support
14 13 12
Immobilized Waste (ILAW)
To Long TramMonitoring
To Phase 2 Processing
NOTES:
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for Ml details.
KEY:
AOMty DmSon
Logic Ties on the Same Figure
-» From PERT Box
Logic Ties to Different Figure
Scheduled finiifa dale To PERT B o \ „ v j_ ^From PERT Box
Formal DOB re-evaluations points
for TWRS Program called out in
TWRS EIS ROD
} 1 P t i° r to proceeding with Phase 1b.
•^2^"Prior to Phase 1 hot operations,
•^3 7^Prior to decision to proceed with Phase 2.
OWNERS
DNFSBMS92-4#2
9/1997
Activities that havea grey backgroundhave been grouped
WDAYS FLOAT
HNF-1946 Rev. 0Figure A-16
M.L.Lee
J A vbogd
CHECKED G . F . Williamson
PROGRAM MANAGER R J .
W.M. Fundertxjite
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 LogicImmobilized Waste (ILAW)
-11-2-029140
i. j^s^&^fcJlxL -_v_ S L .
14 13 12 10
I in mobilized Waste (IHLW)NOTES:
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
I B3BEH5T
p™M«ybpi«,
t-^-.-^.S.-,..s t o n M W P ™ : ™ ' t
DRT^T
KEY:
Logic Ties on die Same Figure
Logic Ties to Different FigureTo PERT Box . , ^FromPERTE
' I60.A18 ^ CififtAia
Formal DOE re-evaluations pointsfor TWRS Pro-am called out in
TWRS EIS ROD
XTj"?' Prior to proceeding with Phase lb.
'^27FPrioi'to Phase 1 hot operations.
to decision to proceed with Phase 2.
OWNERS
DNFSB MS 92-4#2
9/1997
iR Nudes Safety ft Utxamg
BCtwtKUmttim
' IMrievil
Activities that havea grey backgroundhave been grouped
I together for discussion
^ 0-60 DAYS FLOAT
1CDI(1D13,
(W-464)
ed CS Facility Put A Permit
.CT Fidlily Put B Famil
(W-164)
DW3N0 TTTLE
DRAWING 7RACEABIUTYUST1
-»-TO PHASE 2
-oM-90-31 CnnpiHe Siatop IHLW-
HNF-1946 Rev. 0
Figure A-17
REFNUMBER
DRAWING LIST
"FTRE
REFERENCESNEXTUSED ON
REVISIONS
CADFILE SDHW1219.CVS
T"
CADCODE
K.C. Burgard
G.F.Williamson
PROGRAM MANAGER R . J .
CHIEF ENGINEER w . M . Funderburke
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS Retrieval Level 1 Logic
Immobilized Waste (IHLW)
11-2-829149-ft
Infrastructure Phase 1Privatization Support
NOTKS:
1. This logic is a summary representation ofthe program schedule. Durations shown areapproximate and represent activity execution time.Time for planning and reporting is not included.See the detailed program schedule for full details.
EEIE
i
—-+•
OUM 1 s
KEY:>> 1 oait Tits on Ihc %amc HBUK;
-•g . — i-..,.„ .--.. TnPl-P 1 Hnv Frnni PI PT H,IN
A ~ 1iW'SBMS 9:-4 * " ^ r
tt U l l l it 1 k 1
t ti t rd t
IINF-1446 Rev. 0Figure A-18
DRAWING LIST
DWG NO TITLr: —i- REF NUMBER TITLE
REFERENCES
R
CHECKED R
^EPE—ER
}
DATE COMPANY
I.L, Lee
,W. Root
J . Parazin
^RR.W Root
W.M. Funderfaurke
U.S. DEPARTMENT OF ENERGYRichland Operations Office
LOCKHEED MARTIN
TWRS RETRIEVAL Level 1 LogicInfrastructure Phase 1Privatization Support
REVISIONS
DRAWING TRACEABILITY LIST NEXT USED ON | C A D F I L E l n f _ 1 2 1 9 . C V S CADCODE
To
Document
Project
Control Services
Title/Work Order
Tank Waste Remediation Systems
Name
DISTRIBUTION SHEETFrom
TWRS Configuration Management
(HNF-1946)
MSINText
With A l lAttach.
TextOnly
Page 1 of 1
Date January 3, 1998
EDT No. £,-a.TL7<t(o
ECN No.
Attach./ .Appendix
Only
EDT/ECNOnly
J.NM.PO.AE.RJ.OK.ND.MR.JM.AL.G.R.WR.ES.H
AlibertDelozierHalvorsonHammHoneymanJordanMcOanielMurkowskiPaynePeckPowellRaymondRifaey
B. RootP.S. Schaus
SeemanTreatVannWicks JrWojtasek
S.E.R.L.J.M.J.H.R.D.
S2-48R2-58G3-21Rl-31G3-21G3-21H7-06H6-37R2-58H6-35H5-03R2-38Rl-56G3-21H5-03H6-35 .H5-03H6-37H7-07G3-21
XXXXXXX3 copiesXXXXX2 copiesXX3 copiesXX3 coDies
Central Files B1-O7