REKAP okREKAPITULASI ANALISA HARGA PEKERJAAN PROYEKTAHUN ANGGARAN 2010NOK. BaruKODEPEKERJAANSATUANHARGA SAT. PEKERJAAN (Rp)1A 02A 0021 M1 PEK. PASANGAN BOUWPLANKm27,540.00V2A 04A 0041 M2 PEK. KANTOR DIREKSIm2500,360.00V3A 05A 0051 M2 PAPAN NAMA PROYEKm2388,640.00V4A 07DIHITPENGUKURAN DAN PEMASANGAN PATOKm3,015.12V5C 01SNI-P13BONGKARAN BETON BERTULANGm3324,483.50V6C 02DIHITBONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALATm375,790.00V7C 04L.4BONGKARAN DINDING BATA/BATUm348,675.00V8D 01SNI-T1GALIAN TANAH BIASA SEDALAM 1 Mm335,337.50V9D 02SNI-T2GALIAN TANAH BIASA SEDALAM 2 Mm343,807.50V10D 03SNI-T3GALIAN TANAH BIASA SEDALAM 3 Mm352,464.50V11D 06SNI-T4GALIAN TANAH KERAS SEDALAM 1 Mm346,992.00V12D 08SNI-T6GALIAN TANAH LUMPUR SEDALAM 1 Mm357,007.50V13D 10SNI-T8PEMBUANGAN TANAH SEJAUH 30 Mm315,455.00V14D 11SNI-T9PERATAAN TANAHm310,224.50V15D 12SNI-T10PEMADATAN TANAHm326,675.00V16D 13SNI-T11URUGAN PASIRm3208,120.0017D 14K.225PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH)m3331,466.67V18D 15K.225bPENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN (MENGGUNAKAN BURUH)m3168,666.67V19D 16K.310PENIMBUNAN BADAN JALAN (MENGGUNAKAN BURUH)m3148,206.67V20D 17K.310bPEMADATAN BADAN JALAN (MENGGUNAKAN BURUH)m386,166.67V21D 18K.341PENYIAPAN TANAH DASAR (MENGGUNAKAN BURUH)ARE137,998.44V22D 19K.342PENYIAPAN TANAH DASAR (MENGGUNAKAN ALAT)m352,536.00V23D 21DIHITPERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALATm331,103.1624D 22DIHITURUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALATm3228,041.66V25D 23DIHITPEKERJAAN URUGAN SIRTU UNTUK PONDASIm3234,850.00V26D 24K.410PEMBENTUKAN BAHU JALAN (MENGGUNAKAN BURUH)m3116,875.00V27D 25K.410aPEMBENTUKAN BAHU JALAN MATERIAL SPLIT 5 - 7 (MENGGUNAKAN BURUH)m3264,412.50V28E 01DIHITPEKERJAAN PONDASI BATAKO AD. 1 : 4m3920,068.60V29E 05DIHITPEKERJAAN STOOTWERKm123,745.88V30E 08G.51cPASANGAN SIARAN AD. 1 : 2m233,661.65V31E 11SNI-PD5*PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)m3666,391.00V32F 01K.719*PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE)m3695,658.33V33F 02K.720*PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE)m3684,658.33V34F 03K.721*PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE)m3705,558.33V35F 04K.725*PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE)m3778,777.08V36F 05PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE)m3830,477.0837F 06K.730*PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE)m3863,477.08V38F 08SNI-K.225BETON STRUKTUR K 225 (SITE MIX)m3858,727.67V39G 05A 0691 M2 PASANGAN BATA MERAH 1 : 3m294,276.60V40G 06A 0701 M2 PASANGAN BATA MERAH 1 : 4m282,486.76V41I 01K.710PERANCAH KAYU KONSTRUKSI BETON (BEKISTING)m2116,435.00V42I 08DIHITPASANG TRIPLEKS TEBAL 3 MMm227,470.30V43J 03A 1201 M2 PLESTERAN DINDING 1 : 3 + ACIANm241,003.60V44J 04SNI-PL3PLESTERAN 1 PC : 3 PS, TEBAL 15 MMm238,895.00V45N 11DIHITPENGECATAN PERMUKAAN BAJA DOWEL DENGAN MENI BESIm216,665.00V46N 12DIHITPENGECATAN PERMUKAAN BAJA GALVANIZEm223,122.00V47Q 01K.510LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING (MENGGUNAKAN ALAT)m3246,345.00V48Q 02K.515LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI (MENGGUNAKAN BURUH)m3284,450.83V49Q 03K.515bLAPIS PONDASI BAWAH KELAS C AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH)m3263,092.50V50Q 04K.520LAPIS PONDASI ATAS KELAS A AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH)m3246,345.00V51Q 05K.528PASANGAN LAPIS ATB (MENGGUNAKAN ALAT)m31,982,307.12V52Q 06K.617LABUR ASPAL DUA LAPIS (BURDA)m244,336.13V53Q 07K.618PASANGAN LAPENm276,990.00V54Q 08K.619LAPIS ASPAL RESAP PELEKAT (PRIME COAT)m215,395.06V55Q 09K.620LAPIS ASPAL PELEKAT (TACK COAT)m23,545.31V56Q 10K.636PENGHAMPARAN LAPIS TIPIS ASPAL BETON (MENGGUNAKAN ALAT)m275,654.19V57Q 11K.636aPENGHAMPARAN LAPIS TIPIS ASPAL BETONm273,817.33V58Q 12K.641PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC (MENGGUNAKAN ALAT)m2111,610.13V59Q 13DIHITPLASTIK BOND BREAKERm22,970.00V60Q 14DIHIT1 M1 JOINT CUTTER & JOINT SEALENTm8,974.92V61R 14K.715PENULANGAN BETON (BESI ULIR)kg16,852.00V62R 14aK.715aPENULANGAN BETON (BESI POLOS)kg13,015.75V63S 08DIHITPASANGAN CERUCUK DOLKENm264,735.00V64S 09DIHITPASANGAN SULINGANm219,357.12V65S 12DIHITPELUMURAN BESI DOWEL DENGAN OLIltr3,325.13V66S 13DIHIT1 BUAH PASANG PVC 1" untuk DOWELbh4,310.74V67S 14DIHIT1 BUAH PASANG DOP PVC 1" untuk DOWELbh3,399.00V68S 15DIHIT1 M PASANG PVC 4"m23,830.13V69S 16DIHIT1 M1 PASANG BESI SIKU 5 CMm21,816.67V70K.112K.112PASANGAN BATU PADA PARIT (MENGGUNAKAN BURUH)m'396,174.17V71K.705K.705KONSTRUKSI PASANGAN BATU (MENGGUNAKAN BURUH) ADUKAN 1 : 5m3693,495.00V72SNI-BoSNI-BoBETON NON STRUKTUR/RABAT KELAS Bo (SITE MIX)m3712,910.52KEPALA DINAS BINA MARGA DAN SUMBER DAYA AIRV73SNI-PD5SNI-PD5PASANG PONDASI BATU BELAH 1 PC : 4 PSm3653,802.00KOTA DEPOKV95DIHIT1 M2 FINISHING GRID RIGID PAVEMENT / TROWEL BERGARISm4,081.3796DIHIT1 M2 CURING BETONm3,150.24- Harga Satuan Pekerjaan sudah termasuk keuntungan 10%- Harga Satuan Pekerjaan belum termasuk PPN 10 %- Harga Satuan Pekerjaan per triwulan akan dievaluasiIr. H. HERMAN HIDAYAT, MT- Harga Satuan Pekerjaan belum termasuk antisipasi terhadap kenaikan BBMKEPALA DINAS BINA MARGA DAN SUMBER DAYA AIRNIP.KOTA DEPOKIr. H. HERMAN HIDAYAT, MTNIP.

Depok, September 2008 KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, M.T.NIP. 480 108 121Depok, September 2008 KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, M.T.NIP. 480 108 121Depok, September 2008 KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, M.T.NIP. 480 108 121Depok, September 2008 KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, M.T.NIP. 480 108 121Depok, September 2008 KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, M.T.NIP. 480 108 121Depok, September 2008 KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, M.T.NIP. 480 108 121

MaterialDAFTAR HARGA SATUAN BAHAN/MATERIALTAHUN ANGGARAN 2010NOBAHAN / MATERIALKODESATUANHARGA SATUANKET.1Abu Batum3Rp152,000.000.02Alat BantuM. 170setRp75,000.001 set @ 3 alat3Ampelas HaluslbrRp3,000.004Ampelas KasarlbrRp3,000.005Ampelas SedanglbrRp3,000.006Arang KayukgRp9,240.007Aspal BitumenM. 061kgRp11,000.008Asphalt Liter (AC) LastontonRp809,000.009Asphalt Liter EmulsionltrRp7,200.0010Asphalt Liter Lataston (HRS)tonRp900,000.0011Asphalt Liter Treated Based (ATB)tonRp742,000.0012Bahan Bakar ResidultrRp4,050.00A13Bambu dia 7 s/d 10btgRp16,000.0014Bambu dia. 5 s/d 7btgRp13,000.0015Bambu GombongbtgRp61,740.0016Bata BA-6-A (6 cm Abu) 1 m2= 44 Bhm2Rp47,900.0017Bata BA-6-A (6 cm Merah) 1 m2= 44 Bhm2Rp53,300.0018Bata BA-8-A (8 cm Abu) 1 m2= 44 Bhm2Rp62,300.0019Bata BA-8-A (8 cm Abu) 1 m2= 44 Bhm2Rp63,900.0020Bata Merah Bakar Kelas IbhRp300.0021Bata Merah Bakar Kelas IIbhRp300.0022Bata Merah Oven (Klingker)bhRp1,000.0023Batako Besar 8 x 20 x 30bhRp2,415.0024Batako Kecil 8 x 10 x 20bhRp1,200.0025Batang KelapabtgRp128,700.0026Batu Belah 10 - 15 cmM. 020m3Rp158,000.0027Batu Belah PondasiM. 020m3Rp158,000.0028Batu Bronjol (untuk Bronjong)m3Rp131,000.0029Batu Cadas Besar / Sedangm2Rp29,000.0030Batu Pecah 0,5 - 1 cmM. 026m3Rp168,000.0031Batu Pecah 1 - 2 cmM. 025m3Rp194,000.0032Batu Pecah 2 - 3 cmM. 024m3Rp189,000.0033Batu Pecah 3 - 5 cmM. 023m3Rp189,000.0034Batu Pecah 5 - 7 cmM. 022m3Rp158,000.0035Batu Pecah Tersaring AM. 012m3Rp158,000.0036Batu Pecah Tersaring BM. 012m3Rp158,000.0037Batu Pecah Tersaring CM. 012m3Rp158,000.0038m3Rp175,700.0039Baud (untuk jembatan)M. 163bhRp8,610.0040Besi BCR Lengkap Tiang (Tanpa Pondasi)m2Rp264,000.0041Besi Beton U - 24 (Polos)M. 167kgRp9,100.0042Besi Beton U - 32 KS (Ulir)kgRp12,200.0043Besi Beton Diameter 6 mmbtgRp18,000.0044Besi Beton Diameter 8 mmbtgRp40,000.0045Besi Beton Diameter 10 mmbtgRp61,000.0046Besi Beton Diameter 12 mmbtgRp84,000.0047Besi Beton Diameter 16 mmbtgRp163,000.0048Besi Beugel Kuda-kudakgRp29,100.0049Besi Plat tebal 10 mmmRp231,420.0050Besi ProfilkgRp9,555.0051Besi Siku 3 x 30 x 30 mm ( 6 meter)btgRp44,000.0052Besi Siku 3 x 40 x 40 mm ( 6 meter)btgRp63,000.0053Besi Siku 3 x 50 x 50 mm (6 meter)btgRp95,000.0054Bilik Bambu (dengan Kulit)lbrRp92,505.0055Bilik Bambu (tanpa Kulit)lbrRp64,785.0056Blast Bitm34kgRp40,000.0057Bensin PremiumltrRp4,500.0058BondeklbrRp119,385.0059Box Culvert 100.100.100 (Kwalitas 1)m' (btg)Rp2,815,000.0060Box Culvert 40.40.100 (Kwalitas 1)m' (btg)Rp838,000.0061Box Culvert 50.50.100 (Kwalitas 1)m' (btg)Rp964,000.0062Box Culvert 60.60.100 (Kwalitas 1)m' (btg)Rp1,265,000.0063Box Culvert 80.80.100 (Kwalitas 1)m' (btg)Rp2,339,000.0064Buis Beton dia. 100 (Kwalitas 1)bhRp473,000.00Rp363,086.160.76762402165Buis Beton dia. 20 (Kwalitas 1)bhRp37,000.00Rp28,402.0928,402.0956,804.1866Buis Beton dia. 30 (Kwalitas 1)bhRp47,000.00Rp39,165.001.2000510663916567Buis Beton dia. 40 (Kwalitas 1)bhRp105,000.00Rp80,600.5268Buis Beton dia. 50 (Kwalitas 1)bhRp147,000.00Rp112,840.7369Buis Beton dia. 60 (Kwalitas 1)bhRp168,000.00Rp128,960.8470Buis Beton dia. 80 (Kwalitas 1)bhRp336,000.00Rp257,921.6771Buis Beton dia. 90 (Kwalitas 1)bhRp394,000.00Rp302,443.8672Cansteen 10.20.40bhRp4,000.0073Cansteen 15.25.40bhRp5,000.0074Cansteen 20.30.60bhRp7,000.0075Cat Besi Duco Danaglos/ICIkgRp89,000.0076Cat Besi SievekgRp49,000.0077Cat BronzekgRp37,000.0078Cat Cansteen Putih5 KgRp58,000.0079Cat Dasar Beton Eksterior (pelapis Alkali ICI)ltrRp84,000.008000080Cat Dasar Beton Interior (2 Pelapis)ltrRp63,000.006000081Cat Kayu SievekgRp50,000.0082Cat MeniekgRp21,000.0083Cat MinyakkgRp8,000.0084Cat Tembok ICI EksteriorgalonRp1,258,000.0085Cat Tembok ICI InteriorgalonRp845,000.0086Cat Tembok SanlekgalonRp58,600.0087Cat Tembok VinilekgalonRp368,000.0088Cat Markam17bkgRp75,900.0089Chek Valve 1/2"bhRp61,740.00Rp1.6790Cover STU 100 Cm HD (Kwalitas 1)btgRp413,000.00Rp688,333.331.666666666791Cover STU 100 Cm LD (Kwalitas 1)btgRp320,000.00Rp533,333.331.666666666792Cover STU 40 Cm HD (Heavy Duty) (Kwalitas 1)btgRp140,000.00Rp233,333.331.666666666793Cover STU 40 Cm LD (Light Duty) (Kwalitas 1)btgRp109,000.00Rp181,666.671.666666666794Cover STU 50 Cm HD (Kwalitas 1)btgRp192,000.00Rp320,000.001.666666666795Cover STU 50 Cm LD (Kwalitas 1)btgRp139,000.00Rp231,666.671.666666666796Cover STU 60 Cm HD (Kwalitas 1)btgRp241,000.00Rp401,666.671.666666666797Cover STU 60 Cm LD (Kwalitas 1)btgRp167,000.00Rp278,333.331.666666666798Cover STU 80 Cm HD (Kwalitas 1)btgRp328,000.00Rp546,666.671.666666666799Cover STU 80 Cm LD (Kwalitas 1)btgRp213,000.00Rp355,000.001.6666666667Cutter ConcreteJam/mRp50,000.00100Deep Well dengan kelengkapannya kap. 150 liter/menitsetRp223,668,165.00101Dempul DucokgRp25,000.00102Dempul Halus/Infra (Wood Filler)kgRp25,000.00103Dempul Kayu Cap KucingkgRp42,000.00104Dempul LilinkgRp5,000.00105Dempul PlastikkgRp25,000.00106Dempul PliturkgRp5,000.00107Dolken 5 s/d 7btgRp7,000.00108Dolken 7 s/d 10btgRp12,000.00109Engsel HarmonikamRp32,000.00110Engsel Jendela UnilonpasangRp21,000.00111Engsel PatrunpasangRp16,000.00112Engsel Pintu Unilon StandardpasangRp26,000.00113Gate Walve 1/2"bhRp38,535.00114GembokbhRp21,000.00115Gergaji BesibhRp31,600.00116GIP Sambungan dia.1 1/2"bhRp18,000.00117GIP Sambungan dia.1 1/4"bhRp16,000.00118GIP Sambungan dia.1 3/4"bhRp17,500.00119GIP Sambungan dia.1"bhRp13,000.00120GIP Sambungan dia.1/2"bhRp11,000.00121GIP Sambungan dia.2 1/2"bhRp21,000.00122GIP Sambungan dia.2"bhRp19,000.00123GIP Sambungan dia.3"bhRp26,000.00124GIP Sambungan dia.4"bhRp32,000.00125Grafel U 20 cmmRp29,400.00126Grafel U 30 cmmRp39,165.00127Grafel U 40 cmmRp48,930.00128Grendel 15 cmbhRp13,000.00129Grendel 5 cmbhRp11,000.00130IjukikatRp25,000.00131Kabel NYA 1x 1.5 Prima (1 rol = 50 m')0.0132Kabel NYA 1x 2.5 Prima (1 rol = 50 m')0.0133Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')0.0134Kabel NYM 2 x 10 Supreme (1 rol = 50 m')0.0135Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')0.0136Kabel NYM 2 x 4 Prima (1 rol = 50 m')0.0137Kabel NYM 2 x 6 Supreme (1 rol = 50 m')0.0138Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')0.0139Kabel NYM 3 x 10 Supreme (1 rol = 50 m')0.0140Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')0.0141Kabel NYM 3 x 4 Prima (1 rol = 50 m')0.0142Kabel NYM 3 x 6 Supreme (1 rol = 50 m')0.0143Kabel NYM 4 x 10 Supreme (1 rol = 50 m')0.0144Kabel NYM 4 x 16 Supreme (1 rol = 50 m')0.0145Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')0.0146Kabel NYM 4 x 4 Prima (1 rol = 50 m')0.0147Kabel NYM 4 x 6 Supreme (1 rol = 50 m')0.0148Kabel NYY 2 x 4 Supreme (1 rol = 50 m')0.0149Kabel NYY 2 x 6 Supreme (1 rol = 50 m')0.0150Kabel NYY 2 x 10 Supreme (1 rol = 50 m')0.0151Kabel NYY 3 x 4 Supreme (1 rol = 50 m')0.0152Kabel NYY 3 x 6 Supreme (1 rol = 50 m')0.0153Kabel NYY 3 x 10 Supreme (1 rol = 50 m')0.0154Kabel NYY 4 x 4 Supreme (1 rol = 50 m')0.0155Kabel NYY 4 x 6 Supreme (1 rol = 50 m')0.0156Kabel NYY 4 x 10 Supreme (1 rol = 50 m')0.0157Kabel NYY 4 x 16 Supreme (1 rol = 50 m')0.0158Kabel NYY 4 x 2,5 mm0.0159Kabel NYY 4 x 3,0 mm0.0131Kape KayubhRp5,100.00132Kape TembokbhRp5,100.00133Kapur pasang/Kapur Tembokm3/kgRp77,175.00134Karet ElastomerikbhRp1,370,880.00135Karet Elastomerik (400 x 400 x 30 mm)bhRp464,415.00136Karet Elastomerik (400 x 400 x 40 mm)bhRp624,330.00137Karet Penyambung Pipa dia. 100 cmbhRp198,975.00138Karet Penyambung Pipa dia. 60 cmbhRp82,425.00139Karet Penyambung Pipa dia. 80 cmbhRp121,275.00140Karung plastik 50 KgbhRp6,195.00141Kawat BC (Tembaga)kgRp70,000.00142Kawat BetonM. 167kgRp13,000.00143Kawat BronjongM. 162kgRp15,000.00144Kawat Harmonika 2 cmm2Rp12,000.00145Kawat Harmonika 4 cmm2Rp24,000.00146Kayu Bakarm3Rp73,710.00147Kayu Balok Borneom3Rp2,100,000.00148Kayu Balok Kamper Singilm3Rp5,985,000.00149Kayu Balok Kruingm3Rp5,040,000.00150Kayu Balok Kamper Samarindam3Rp7,721,250.00151Kayu Balok Rasamalam3Rp3,465,000.00152Kayu Kamper Singkilm3Rp3,354,800.00153Kayu Papan Cor Borneom3Rp2,205,000.00154Kayu Borneo 5/7m3Rp1,470,000.00155Kayu Papan Kamper Singilm3Rp6,195,000.00156Kayu Papan Kruing 2 x 20 x 4mm3Rp5,145,000.00157Kayu Papan Kamper Samarindam3Rp5,250,000.00158Kayu Reng 2/3 Borneom3Rp1,103,000.00159Kayu Reng 2/3 Borneom3Rp1,103,000.00160Kayu Reng 3/4 Borneom3Rp1,103,000.00161Keramik 20 x 20m2Rp56,000.00162Keramik 20 x 25m2Rp40,000.00163Keramik 30 x 30m2Rp59,000.00164Kunci 2 Slaag Ancor AslibhRp74,600.00165Kunci 2 Slaag ISObhRp74,600.00166Kunci 2 Slaag Kuda TerbangbhRp74,600.00167Kunci 2 Slaag ROYALbhRp74,600.00168Kunci 2 Slaag Silinder SEIS Asli Type 210 s/d 226bhRp229,950.00169Kunci 2 Slaag Silinder Utama StandardbhRp275,625.00170Kunci Gembok BesarbhRp79,900.00171Kunci KM Bulat ALFAbhRp47,900.00172Kunci KM Bulat Kualitas BiasabhRp40,750.00173Kunci Silinder ALFA Pintu AlumuniumbhRp257,985.00174Kwas 3 "bhRp8,000.00175Lempengan Rumput Gajahm2Rp31,600.00176Lem FoxkgRp47,000.00177Lem Kuning (Aibon)kgRp63,000.00178Lem Mixed Epoxy AdhesivekgRp11,000.00179Lem ParalonbhRp7,000.00180LinggisbhRp53,000.00181Macam2 Samb. Paralon 2 1/2"bhRp12,810.00182Macam2 Samb. Paralon 3"bhRp22,575.00183Macam2 Samb. Paralon 4"bhRp32,445.00184Macam2 Sambungan GIP 1 1/4"bhRp11,235.00185Macam2 Sambungan GIP 1"bhRp9,030.00186Macam2 Sambungan GIP 1/2"bhRp4,515.00187Macam2 Sambungan GIP 11/2"bhRp12,810.00188Macam2 Sambungan GIP 13/4"bhRp19,005.00189Macam2 Sambungan GIP 2 1/2"bhRp37,695.00190Macam2 Sambungan GIP 2"bhRp26,355.00191Macam2 Sambungan GIP 3"bhRp45,255.00192Macam2 Sambungan GIP 3/4"bhRp5,880.00193Macam2 Sambungan GIP 4"bhRp52,815.00194Macam2 Sambungan Paralon 1 1/2"bhRp9,300.00195Macam2 Sambungan Paralon 1 1/4"bhRp8,150.00196Macam2 Sambungan Paralon 1 3/4"bhRp6,300.00197Macam2 Sambungan Paralon 1"bhRp4,650.00198Macam2 Sambungan Paralon 1/2"bhRp2,900.00199Macam2 Sambungan Paralon 2"bhRp13,350.00200Macam2 Sambungan Paralon 3/4"bhRp4,050.00201Meni Kayu / BesikgRp24,000.00202Minyak CatltrRp19,200.00203Minyak TanahM.065ltrRp13,000.00204Multiplek 12 mm 120 x 240lbrRp137,000.00205Multiplek 18 mm 120 x 240lbrRp210,000.00206Multiplek 9 mm 120 x 240lbrRp90,000.00207Mur / Baut Beam 12 x 25 mmbhRp2,000.00208Mur / Baut Blocking 16 x 30 mmbhRp4,000.00209Mur / Baut Post 16 x 48 mmbhRp5,000.00210Mur Baut Biasa dia.19 s/d 16 (5 cm)bhRp5,000.00211Mur Baut HTB dia. 19 s/d 16 (5 cm)bhRp7,000.00212Mur/Baut 0,25"bhRp2,000.00213Mur/Baut 0,75"bhRp2,000.00214Mur/Baut 10 cmbhRp5,000.00215Oli (Drum)DrumRp24,500.00216Pagar BRC Lengkap Tiang (Tanpa Pondasi)m2Rp264,000.00217Pagar Panel Beton t = 2 mm2Rp393,330.00218PakuM. 166kgRp18,000.00219Paku Beton 2 cm s/d 5 cmkgRp18,000.00220Palu 0,5 KgkgRp26,600.00221Papan 2/20 x 4lbrRp52,400.00222Pasir BetonM. 041m3Rp210,000.00223Pasir PasangM.042m3Rp189,000.00224Pasir TrasM. 041m3Rp147,000.00225Pasir UrugM. 040m3Rp147,000.00226Paving Block Natural 6 cmm2Rp88,200.00227Paving Block Natural 8 cmm2Rp102,900.00228Paving Block Warna 6 cmm2Rp100,800.00229Paving Block Warna 8 cmm2Rp116,550.00230Pipa Baja Bergelombang0.0231Pipa Baja Bergelombang Tipe Kecil - 0RS0.0232Ukuran Gelombang 38 mm x 6.5 mm (non coating)0.0233Tebal 1.2 mm 150 mmm'0.0234Tebal 1.2 mm 200 mmm'0.0235Tebal 1.2 mm 250 mmm'0.0236Tebal 1.2 mm 300 mmm'0.0237Tebal 1.2 mm 350 mmm'0.0238Tebal 1.2 mm 400 mmm'0.0239Tebal 1.2 mm 450 mmm'0.0240Tebal 1.2 mm 500 mmm'0.0241Tebal 1.2 mm 600 mmm'0.0242Tebal 1.4 mm 150 mmm'0.0243Tebal 1.4 mm 200 mmm'0.0244Tebal 1.4 mm 250 mmm'0.0245Tebal 1.4 mm 300 mmm'0.0246Tebal 1.4 mm 350 mmm'0.0247Tebal 1.4 mm 400 mmm'0.0248Tebal 1.4 mm 450 mmm'0.0249Tebal 1.4 mm 500 mmm'0.0250Tebal 1.4 mm 600 mmm'0.0251Tebal 1.4 mm 700 mmm'0.0252Tebal 1.4 mm 750 mmm'0.0253Tebal 1.4 mm 800 mmm'0.02540.0255Pipa Baja Bergelombang Tipe Medium - 1RS0.0256Ukuran Gelombang 63 mm x 13 mm (non coating)0.0257Tebal 1.4 mm 300 mmm'0.0258Tebal 1.4 mm 350 mmm'0.0259Tebal 1.4 mm 400 mmm'0.0260Tebal 1.4 mm 450 mmm'0.0261Tebal 1.4 mm 500 mmm'0.0262Tebal 1.4 mm 600 mmm'0.0263Tebal 1.4 mm 700 mmm'0.0264Tebal 1.4 mm 750 mmm'0.0265Tebal 1.4 mm 800 mmm'0.0266Tebal 1.4 mm 900 mmm'0.0267Tebal 1.4 mm 1000 mmm'0.0268Tebal 1.4 mm 1100 mmm'0.0269Tebal 1.4 mm 1200 mmm'0.0270Tebal 1.4 mm 1350 mmm'0.0271Tebal 1.4 mm 1500 mmm'0.0272Tebal 1.6 mm 300 mmm'0.0273Tebal 1.6 mm 350 mmm'0.0274Tebal 1.6 mm 400 mmm'0.0275Tebal 1.6 mm 450 mmm'0.0276Tebal 1.6 mm 500 mmm'0.0230Tebal 1.6 mm 600 mmm'Rp512,900.00231Tebal 1.6 mm 700 mmm'0.0232Tebal 1.6 mm 750 mmm'0.0233Tebal 1.6 mm 800 mmm'0.0234Tebal 1.6 mm 900 mmm'0.0235Tebal 1.6 mm 1000 mmm'0.0236Tebal 1.6 mm 1100 mmm'0.0237Tebal 1.6 mm 1200 mmm'0.0238Tebal 1.6 mm 1350 mmm'0.0239Tebal 1.6 mm 1500 mmm'0.0240Tebal 1.6 mm 1650 mmm'0.0241Tebal 1.6 mm 1800 mmm'0.0242Tebal 2.0 mm 300 mmm'0.0243Tebal 2.0 mm 350 mmm'0.0244Tebal 2.0 mm 400 mmm'0.0245Tebal 2.0 mm 450 mmm'0.0246Tebal 2.0 mm 500 mmm'0.0247Tebal 2.0 mm 600 mmm'0.0248Tebal 2.0 mm 700 mmm'0.0249Tebal 2.0 mm 750 mmm'0.0250Tebal 2.0 mm 800 mmm'0.0251Tebal 2.0 mm 900 mmm'0.0252Tebal 2.0 mm 1000 mmm'0.0253Tebal 2.0 mm 1100 mmm'0.0254Tebal 2.0 mm 1200 mmm'0.0255Tebal 2.0 mm 1350 mmm'0.0256Tebal 2.0 mm 1500 mmm'0.0257Tebal 2.0 mm 1650 mmm'0.0258Tebal 2.0 mm 1800 mmm'0.0259Tebal 2.0 mm 2000 mmm'0.0260Tebal 2.7 mm 600 mmm'0.0261Tebal 2.7 mm 700 mmm'0.0262Tebal 2.7 mm 750 mmm'0.0263Tebal 2.7 mm 800 mmm'0.0264Tebal 2.7 mm 900 mmm'0.0265Tebal 2.7 mm 1000 mmm'0.0266Tebal 2.7 mm 1100 mmm'0.0267Tebal 2.7 mm 1200 mmm'0.0268Tebal 2.7 mm 1350 mmm'0.0269Tebal 2.7 mm 1500 mmm'0.0270Tebal 2.7 mm 1650 mmm'0.0271Tebal 2.7 mm 1800 mmm'0.0272Tebal 2.7 mm 2000 mmm'0.0273Tebal 3.2 mm 800 mmm'0.0274Tebal 3.2 mm 900 mmm'0.0275Tebal 3.2 mm 1000 mmm'0.0276Tebal 3.2 mm 1100 mmm'0.0277Tebal 3.2 mm 1200 mmm'0.0278Tebal 3.2 mm 1350 mmm'0.0279Tebal 3.2 mm 1500 mmm'0.0280Tebal 3.2 mm 1650 mmm'0.0281Tebal 3.2 mm 1800 mmm'0.0282Tebal 3.2 mm 2000 mmm'0.02830.02840.02850.02860.02870.02880.02890.0290Pipa Baja Bergelombang Tipe Medium - 3RS0.0291Ukuran Gelombang 75 mm x 25 mm (non coating)0.0292Tebal 2.0 mm 1000 mmm'0.0293Tebal 2.0 mm 1100 mmm'0.0294Tebal 2.0 mm 1200 mmm'0.0295Tebal 2.0 mm 1350 mmm'0.0296Tebal 2.0 mm 1500 mmm'0.0297Tebal 2.0 mm 1650 mmm'0.0298Tebal 2.0 mm 1800 mmm'0.0299Tebal 2.0 mm 2000 mmm'0.0300Tebal 2.0 mm 2200 mmm'0.0301Tebal 2.7 mm 1000 mmm'0.0302Tebal 2.7 mm 1100 mmm'0.0303Tebal 2.7 mm 1200 mmm'0.0304Tebal 2.7 mm 1350 mmm'0.0305Tebal 2.7 mm 1500 mmm'0.0306Tebal 2.7 mm 1650 mmm'0.0307Tebal 2.7 mm 1800 mmm'0.0308Tebal 2.7 mm 2000 mmm'0.0309Tebal 2.7 mm 2200 mmm'0.0310Tebal 2.7 mm 2400 mmm'0.0311Tebal 2.7 mm 2700 mmm'0.0312Tebal 2.7 mm 3000 mmm'0.0313Tebal 3.2 mm 1500 mmm'0.0314Tebal 3.2 mm 1650 mmm'0.0315Tebal 3.2 mm 1800 mmm'0.0316Tebal 3.2 mm 2000 mmm'0.0317Tebal 3.2 mm 2200 mmm'0.0318Tebal 3.2 mm 2400 mmm'0.0319Tebal 3.2 mm 2700 mmm'0.0320Tebal 3.2 mm 3000 mmm'0.0321Tebal 3.2 mm 3300 mmm'0.0322Tebal 3.2 mm 3600 mmm'0.03230.0324Pipa Baja Bergelombang Tipe Kecil - 0RS0.0325Ukuran Gelombang 38 mm x 6.5 mm (hot-deep galvanized)0.0326Tebal 1.2 mm 150 mmm'0.0327Tebal 1.2 mm 200 mmm'0.0328Tebal 1.2 mm 250 mmm'0.0329Tebal 1.2 mm 300 mmm'0.0330Tebal 1.2 mm 350 mmm'0.0331Tebal 1.2 mm 400 mmm'0.0332Tebal 1.2 mm 450 mmm'0.0333Tebal 1.2 mm 500 mmm'0.0334Tebal 1.2 mm 600 mmm'0.0335Tebal 1.4 mm 150 mmm'0.0336Tebal 1.4 mm 200 mmm'0.0337Tebal 1.4 mm 250 mmm'0.0338Tebal 1.4 mm 300 mmm'0.0339Tebal 1.4 mm 350 mmm'0.0340Tebal 1.4 mm 400 mmm'0.0341Tebal 1.4 mm 450 mmm'0.0342Tebal 1.4 mm 500 mmm'0.0343Tebal 1.4 mm 600 mmm'0.0344Tebal 1.4 mm 700 mmm'0.0345Tebal 1.4 mm 750 mmm'0.0346Tebal 1.4 mm 800 mmm'0.03470.0348Pipa Baja Bergelombang Tipe Medium - 1RS0.0349Ukuran Gelombang 63 mm x 13 mm (hot-deep galvanized)0.0350Tebal 1.4 mm 300 mmm'0.0351Tebal 1.4 mm 350 mmm'0.0352Tebal 1.4 mm 400 mmm'0.0353Tebal 1.4 mm 450 mmm'0.0354Tebal 1.4 mm 500 mmm'0.0355Tebal 1.4 mm 600 mmm'0.0356Tebal 1.4 mm 700 mmm'0.03570.0358Tebal 1.4 mm 750 mmm'0.0359Tebal 1.4 mm 800 mmm'0.0360Tebal 1.4 mm 900 mmm'0.0361Tebal 1.4 mm 1000 mmm'0.0362Tebal 1.4 mm 1100 mmm'0.0363Tebal 1.4 mm 1200 mmm'0.0364Tebal 1.4 mm 1350 mmm'0.0365Tebal 1.4 mm 1500 mmm'0.0366Tebal 1.6 mm 300 mmm'0.0367Tebal 1.6 mm 350 mmm'0.0368Tebal 1.6 mm 400 mmm'0.0369Tebal 1.6 mm 450 mmm'0.0370Tebal 1.6 mm 500 mmm'0.0371Tebal 1.6 mm 600 mmm'0.0372Tebal 1.6 mm 700 mmm'0.0373Tebal 1.6 mm 750 mmm'0.0374Tebal 1.6 mm 800 mmm'0.0375Tebal 1.6 mm 900 mmm'0.0376Tebal 1.6 mm 1000 mmm'0.0377Tebal 1.6 mm 1100 mmm'0.0378Tebal 1.6 mm 1200 mmm'0.0379Tebal 1.6 mm 1350 mmm'0.0380Tebal 1.6 mm 1500 mmm'0.0381Tebal 1.6 mm 1650 mmm'0.0382Tebal 1.6 mm 1800 mmm'0.0383Tebal 2.0 mm 300 mmm'0.0384Tebal 2.0 mm 350 mmm'0.0385Tebal 2.0 mm 400 mmm'0.0386Tebal 2.0 mm 450 mmm'0.0387Tebal 2.0 mm 500 mmm'0.0388Tebal 2.0 mm 600 mmm'0.0389Tebal 2.0 mm 700 mmm'0.0390Tebal 2.0 mm 750 mmm'0.0391Tebal 2.0 mm 800 mmm'0.0392Tebal 2.0 mm 900 mmm'0.0393Tebal 2.0 mm 1000 mmm'0.0394Tebal 2.0 mm 1100 mmm'0.0395Tebal 2.0 mm 1200 mmm'0.0396Tebal 2.0 mm 1350 mmm'0.0397Tebal 2.0 mm 1500 mmm'0.0398Tebal 2.0 mm 1650 mmm'0.0399Tebal 2.0 mm 1800 mmm'0.0400Tebal 2.0 mm 2000 mmm'0.0401Tebal 2.7 mm 600 mmm'0.0402Tebal 2.7 mm 700 mmm'0.0403Tebal 2.7 mm 750 mmm'0.0404Tebal 2.7 mm 800 mmm'0.0405Tebal 2.7 mm 900 mmm'0.0406Tebal 2.7 mm 1000 mmm'0.0407Tebal 2.7 mm 1100 mmm'0.0408Tebal 2.7 mm 1200 mmm'0.0409Tebal 2.7 mm 1350 mmm'0.0410Tebal 2.7 mm 1500 mmm'0.0411Tebal 2.7 mm 1650 mmm'0.0412Tebal 2.7 mm 1800 mmm'0.0413Tebal 2.7 mm 2000 mmm'0.0414Tebal 3.2 mm 800 mmm'0.0415Tebal 3.2 mm 900 mmm'0.0416Tebal 3.2 mm 1000 mmm'0.04170.0418Tebal 3.2 mm 1100 mmm'0.0419Tebal 3.2 mm 1200 mmm'0.0420Tebal 3.2 mm 1350 mmm'0.0421Tebal 3.2 mm 1500 mmm'0.0422Tebal 3.2 mm 1650 mmm'0.0423Tebal 3.2 mm 1800 mmm'0.0424Tebal 3.2 mm 2000 mmm'0.04250.0426Pipa Baja Bergelombang Tipe Medium - 3RS0.0427Ukuran Gelombang 75 mm x 25 mm (hot-deep galvanized)0.0428Tebal 2.0 mm 1000 mmm'0.0429Tebal 2.0 mm 1100 mmm'0.0430Tebal 2.0 mm 1200 mmm'0.0431Tebal 2.0 mm 1350 mmm'0.0432Tebal 2.0 mm 1500 mmm'0.0433Tebal 2.0 mm 1650 mmm'0.0434Tebal 2.0 mm 1800 mmm'0.0435Tebal 2.0 mm 2000 mmm'0.0436Tebal 2.0 mm 2200 mmm'0.0437Tebal 2.7 mm 1000 mmm'0.0438Tebal 2.7 mm 1100 mmm'0.0439Tebal 2.7 mm 1200 mmm'0.0440Tebal 2.7 mm 1350 mmm'0.0441Tebal 2.7 mm 1500 mmm'0.0442Tebal 2.7 mm 1650 mmm'0.0443Tebal 2.7 mm 1800 mmm'0.0444Tebal 2.7 mm 2000 mmm'0.0445Tebal 2.7 mm 2200 mmm'0.0446Tebal 2.7 mm 2400 mmm'0.0447Tebal 2.7 mm 2700 mmm'0.0448Tebal 2.7 mm 3000 mmm'0.0449Tebal 3.2 mm 1500 mmm'0.0450Tebal 3.2 mm 1650 mmm'0.0451Tebal 3.2 mm 1800 mmm'0.0452Tebal 3.2 mm 2000 mmm'0.0453Tebal 3.2 mm 2200 mmm'0.0454Tebal 3.2 mm 2400 mmm'0.0455Tebal 3.2 mm 2700 mmm'0.0456Tebal 3.2 mm 3000 mmm'0.0457Tebal 3.2 mm 3300 mmm'0.0458Tebal 3.2 mm 3600 mmm'0.0231Pipa Btn Brtlg Dia. 0.50 Mm'Rp331,695.00232Pipa Btn Brtlg Dia. 0.60 Mm'Rp467,355.00233Pipa Btn Brtlg Dia. 0.80 Mm'Rp810,810.00234Pipa Btn Brtlg Dia. 1 Mm'Rp1,282,575.00235Pipa GIP Medium A 1 1/2"btgRp221,350.00236Pipa GIP Medium A 1 1/4"btgRp203,850.00237Pipa GIP Medium A 1 3/4"btgRp250,635.00238Pipa GIP Medium A 1"btgRp137,130.00239Pipa GIP Medium A 1/2"btgRp104,850.00240Pipa GIP Medium A 2 1/2"btgRp412,020.00241Pipa GIP Medium A 2" Tebal 1,8 mmbtgRp266,805.00242Pipa GIP Medium A 2" Tebal 2 mmbtgRp379,890.00243Pipa GIP Medium A 3" Tebal 2 mmbtgRp535,185.00244Pipa GIP Medium A 3/4" Tebal 1,8 mmbtgRp104,850.00245Pipa GIP Medium A 4" Tebal 1,8 mmbtgRp660,450.00246Pipa GIP Medium A 4" Tebal 2 mmbtgRp1,345,995.00247Pipa GIP Medium A 5" Tebal 1,8 mmbtgRp804,930.00248Pipa GIP Medium A 6" Tebal 1,8 mmbtgRp964,110.00249Pipa GIP Medium A 6" Tebal 2 mmbtgRp1,366,575.00250Pipa GIP Medium A 8" Tebal 1,8 mmbtgRp1,284,990.00251Pipa PVC (Sambungan) Jenis AW 4 " TYbhRp239,700.00252Pipa PVC Maspion ABU dia 1 1/2" (AW)btgRp35,595.00253Pipa PVC Maspion ABU dia 1 1/4" (AW)btgRp29,715.00254Pipa PVC Maspion ABU dia 1" (AW)btgRp27,300.00255Pipa PVC Maspion ABU dia 1/2" (AW)btgRp15,435.00256Pipa PVC Maspion ABU dia 2 1/2" (AW)btgRp47,460.00257Pipa PVC Maspion ABU dia 2" (AW)btgRp41,580.00258Pipa PVC Maspion ABU dia 3" (AW)btgRp59,325.00259Pipa PVC Maspion ABU dia 3/4" (AW)btgRp19,005.00260Pipa PVC Maspion ABU dia 4" (AW)btgRp83,055.00261Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1/2"btgRp32,000.00262Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3/4"btgRp39,100.00263Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1"btgRp56,600.00264Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/4"btgRp76,400.00265Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/2"btgRp99,600.00266Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2"btgRp141,500.00267Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2 1/2"btgRp182,300.00268Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3"btgRp277,700.00269Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 4"btgRp429,400.00270Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 5"btgRp562,100.00271Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 6"btgRp844,000.00272Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 8"btgRp1,276,400.00273Plamir tembokkgRp16,590.00274Plat Besi Tipis 1 mmkgRp10,290.00275Plat Strip 2 x 30 mm (6m)btgRp29,400.00276Plat Strip 3 x 30 mm (6m)btgRp39,165.00277Ply Wood 18 mm (120 x 240)lbrRp262,100.00278Plastik Bond Breakerm2Rp1,800.00189000279PVC (Sambungan) 1 1/4"bhRp5,800.00280PVC (Sambungan) 1 3/4"bhRp4,725.00281PVC (Sambungan) 1"bhRp4,650.00282PVC (Sambungan) 1/2"bhRp2,300.00283PVC (Sambungan) 2"bhRp7,650.00284PVC (Sambungan) 3/4"bhRp2,900.00285PVC (Sambungan) 1 1/2"bhRp6,950.00286PVC (Sambungan) 2 1/2"bhRp12,810.00287PVC (Sambungan) 3"bhRp22,575.00288PVC (Sambungan) 4"bhRp37,250.00289Pipa 200 CL Class 2 PC-I Dusaspun (L=2.45 m)btgRp218,000.00290Pipa 300 CL Class 2 PC-I DusaspunbtgRp396,000.00291Pipa 400 CL Class 2 PC-I DusaspunbtgRp590,000.00292Pipa 500 CL Class 2 PC-I DusaspunbtgRp89,000.00293Pipa 600 CL Class 2 PC-I DusaspunbtgRp1,159,000.00294Pipa 700 CL Class 2 PC-I DusaspunbtgRp1,466,000.00295Pipa 800 CL Class 2 PC-I DusaspunbtgRp1,811,000.00296Pipa 900 CL Class 2 PC-I DusaspunbtgRp2,210,000.00297Pipa 1000 CL Class 2 PC-I DusaspunbtgRp2,625,000.00298Pipa 1100 CL Class 2 PC-I DusaspunbtgRp3,294,000.00299Pipa 1200 CL Class 2 PC-I DusaspunbtgRp4,172,000.00300Pipa 1300 CL Class 2 PC-I DusaspunbtgRp4,753,000.00301Pipa 1400 CL Class 2 PC-I DusaspunbtgRp5,264,000.00302Pipa 1500 CL Class 2 PC-I DusaspunbtgRp5,808,000.00303Pipa 1600 CL Class 2 PC-I DusaspunbtgRp8,412,000.00304Pipa 1650 CL Class 2 PC-I DusaspunbtgRp6,421,000.00305Pipa 1800 CL Class 2 PC-I DusaspunbtgRp7,680,000.00306Pipa 2000 CL Class 2 PC-I DusaspunbtgRp18,008,000.00307Pipa 2100 CL Class 2 PC-I Dusaspun (L=2.45 m)btgRp15,328,000.00308Pipa 300 FJ Class 2 Dusaspun (L=2.5 m)btgRp372,000.00309Pipa 400 FJ Class 2 Dusaspun (L=2.5 m)btgRp554,000.00310Pipa 500 FJ Class 2 Dusaspun (L=2.5 m)btgRp751,000.00311Pipa 600 FJ Class 2 Dusaspun (L=2.5 m)btgRp1,038,000.00312Pipa 700 FJ Class 2 Dusaspun (L=2.5 m)btgRp1,271,000.00313Pipa 800 FJ Class 2 Dusaspun (L=2.5 m)btgRp1,550,000.00314Pipa 900 FJ Class 2 Dusaspun (L=2.5 m)btgRp1,854,000.00315Pipa 1000 FJ Class 2 Dusaspun (L=2.5 m)btgRp2,118,000.00316Pipa 1100 FJ Class 2 Dusaspun (L=2.5 m)btgRp2,471,000.00317Pipa 1200 FJ Class 2 Dusaspun (L=2.5 m)btgRp2,925,000.00318Pipa 1300 FJ Class 2 Dusaspun (L=2.5 m)btgRp3,337,000.00319Pipa 1400 FJ Class 2 Dusaspun (L=2.5 m)btgRp3,677,000.00320Pipa 1500 FJ Class 2 Dusaspun (L=2.5 m)btgRp4,079,000.00321Pipa 1650 FJ Class 2 Dusaspun (L=2.5 m)btgRp4,865,000.00322Pipa 1800 FJ Class 2 Dusaspun (L=2.5 m)btgRp5,720,000.00323Pipa 2100 FJ Class 2 Dusaspun (L=2.5 m)btgRp8,211,000.00324Pipa 300 R Class L Witera (L=1.25 m)btgRp282,000.00325Pipa 400 R Class L Witera (L=1.25 m)btgRp413,000.00326Pipa 500 R Class L Witera (L=1.25 m)btgRp604,000.00327Pipa 600 R Class L Witera (L=2.5 m)btgRp1,423,000.00328Pipa 700 R Class L Witera (L=2.5 m)btgRp1,895,000.00329Pipa 800 R Class L Witera (L=2.5 m)btgRp2,489,000.00330Pipa 900 R Class L Witera (L=2.5 m)btgRp3,174,000.00331Pipa 1000 R Class L Witera (L=2.5 m)btgRp3,878,000.00332Pipa 1100 R Class L Witera (L=2.5 m)btgRp4,803,000.00333Pipa 1200 R Class L Witera (L=2.5 m)btgRp5,597,000.00334Pipa 1300 R Class L Witera (L=2.5 m)btgRp65,303,000.00335Pipa 1500 R Class L Witera (L=2.5 m)btgRp8,612,000.00336Pipa 300 NR Witera (L=1.25 m)btgRp277,000.00337Pipa 400 NR Witera (L=1.25 m)btgRp406,000.00338Pipa 500 NR Witera (L=1.25 m)btgRp596,000.00339Pipa 600 NR Witera (L=2.5 m)btgRp1,391,000.00340Pipa 700 NR Witera (L=2.5 m)btgRp1,853,000.00341Pipa 800 NR Witera (L=2.5 m)btgRp3,105,000.00342Pipa 900 NR Witera (L=2.5 m)btgRp3,799,000.00343Pipa 1000 NR Witera (L=2.5 m)btgRp609,000.00344Readymix Beton B0 Tanpa Pompa (Selang)Rp609,000.00345Readymix Beton K 125, Tampa Pompa (Selang)Rp599,000.00346Readymix Beton K 175, Tampa Pompa (Selang)m3Rp618,000.00347Readymix Beton K 225, Tampa Pompa (Selang)m3Rp683,000.00348Readymix Beton K 300, Tampa Pompa (Selang)m3Rp730,000.00840000349Readymix Beton K 350, Tampa Pompa (Selang)Rp760,000.00733000350Roll Cat TembokbhRp43,155.00351Roll Meter 50 Meter (Bahan Plastik)bhRp69,900.00352Roll Meter 30 Meter (Bahan Plastik)bhRp69,900.00353Roll Meter 5 Meter (Bahan Plastik)bhRp15,435.00354Rumah Panel 30 x 60 cm (Kosong)unitRp115,710.00355Rumah TL In Bow / Out Bw 2 x 20 W (Kosong)bhRp88,200.00356Saklar Broco Seri Standard ( 1 Phase)bhRp26,000.00357Saklar Broco Tunggal Standard ( 1 Phase)bhRp20,000.00358Sambungan Pipa PVC Jenis AW 4 " TYbhRp78,015.00359Saringan Air Liter KM Stainless SteelbhRp40,750.00360Sekring Kas 2 Group BiasaunitRp127,470.00361Sekring Kas 3 Group BiasaunitRp161,385.00362Sekring Kas 5 Group BiasaunitRp339,045.00363SekrupbhRp2,153.00364SealentkgRp32,000.00365Selang Plastik untuk Water Pass dia 0,5 cmbhRp5,100.00366Semen Portland/PC (50 Kg/zak)M. 080zakRp61,000.00367Seng Gelombang 180 x 90 x 0,5 BJLS 30lbrRp63,000.00368Seng Plat 90 cm x 0,5 mmlbrRp302,000.00369Seng Plat BJLS 30 Lebar 60 cmlbrRp74,000.00370Seng Plat BJLS 30 Lebar 90 cmlbrRp23,000.00371Seng BJS 0.20 Gelombang 85 x 180 cmlbrRp47,000.00372Seng BJS 0.30 Gelombang 85 x 180 cmlbrRp65,000.00373Seng BJS 0.40 Gelombang 85 x 180 cmlbrRp98,000.00374Sirtu Pecah TersaringM. 042m3Rp158,000.00375SolarM. 183ltrRp4,500.00376Solatip LeidengbhRp2,415.00377Stempet / GemukkgRp19,400.00378Stop Kontak Broco 3 Phase (In Bow)bhRp111,825.00379Stop Kontak Broco 3 Phase (Out Bow)bhRp65,625.00380Stop Kontak Broco Standard (1 Phase)bhRp19,950.00381Stop Kontak Handle 3 PhasebhRp65,625.00382Stop Kran 1 1/2" KITbhRp176,925.00383Stop Kran 1" KITbhRp117,915.00384Stop Kran 2 1/2" KITbhRp510,300.00385Stop Kran 2" KITbhRp221,130.00386Stop Kran 3" KITbhRp578,640.00387Stop Kran 3/4" KITbhRp86,940.00388STU 100.100.120 Cm (Kwalitas 1)bhRp1,653,000.001377500389STU 100.100.120 Cm + Support (Kwalitas 1)btgRp2,498,950.002082458.33333333390STU 40.40.120 Cm (Kwalitas 1)btgRp363,000.00302500391STU 40.40.120 Cm + Support (Kwalitas 1)btgRp520,000.00433333.333333333392STU 40.50.120 Cm (Kwalitas 1)btgRp411,000.00342500393STU 40.50.120 Cm + Support (Kwalitas 1)btgRp586,000.00488333.333333333394STU 40.60.120 Cm (Kwalitas 1)btgRp457,000.00380833.333333333395STU 40.60.120 Cm + Support (Kwalitas 1)btgRp651,000.00542500396STU 50.50.120 Cm (Kwalitas 1)btgRp540,000.00450000397STU 50.50.120 Cm + Support (Kwalitas 1)btgRp772,000.00643333.333333333398STU 50.60.120 Cm (Kwalitas 1)btgRp604,000.00503333.333333333399STU 50.60.120 Cm + Support (Kwalitas 1)btgRp866,000.00721666.666666667400STU 50.70.120 Cm (Kwalitas 1)btgRp668,000.00556666.666666667401STU 50.70.120 Cm + Support (Kwalitas 1)btgRp953,000.00794166.666666667402STU 60.60.120 Cm (Kwalitas 1)btgRp641,000.00534166.666666667403STU 60.60.120 Cm + Support (Kwalitas 1)btgRp919,000.00765833.333333333404STU 60.70.120 Cm (Kwalitas 1)btgRp705,000.00587500405STU 60.70.120 Cm + Support (Kwalitas 1)btgRp1,006,000.00838333.333333333406STU 60.80.120 Cm (Kwalitas 1)btgRp768,000.00640000407STU 60.80.120 Cm + Support (Kwalitas 1)btgRp1,097,000.00914166.666666667408STU 80.100.120 Cm (Kwalitas 1)btgRp1,101,000.00917500409STU 80.100.120 Cm + Support (Kwalitas 1)btgRp1,588,700.001323916.66666667410STU 80.80.120 Cm (Kwalitas 1)btgRp966,000.00805000411STU 80.80.120 Cm + Support (Kwalitas 1)btgRp1,400,500.001167083.33333333412Tanah Urugm3Rp63,000.00413Tangki Air Polyetiline (Panda)TB 32bhRp671,000.00414Tangki Air Polyetiline (Panda)TB 55bhRp1,038,400.00415Tangki Air Polyetiline (Panda)TB 110bhRp1,730,600.00416Teak Wood 3 mm 120 x 240lbrRp110,650.00417Teak Wood 3 mm 120 x 240 Ukuran PintulbrRp87,350.00418Teak Wood 4 mm 120 x 240lbrRp122,300.00419Teak Wood 4 mm 120 x 240 Ukuran PintulbrRp104,850.00420Terpal PlastikmRp7,000.0053130022137.5421Thinnerm33literRp17,000.00422Timah HitamkgRp18,000.00423Timbunan Tanah PilihanM. 050m3Rp47,000.00424Triplek tb. 4 mmlbrRp63,000.00425Tripleks 3 mm 120 x 240lbrRp47,000.00426Tripleks 4 mm 120 x 240lbrRp63,000.00427Tripleks 4 mm 120 x 240 Ukuran PintulbrRp47,000.00428Tripleks 6 mm 120 x 240lbrRp89,000.00429Tripleks 9 mm 120 x 240lbrRp137,000.00430Triplek 12 mmlbrRp210,000.00431Triplek 15 mmlbrRp247,000.00432Triplek 18 mmlbrRp289,000.00433Tutup Pipa 1"bhRp3,000.00434Tutup Pipa 1,5"bhRp4,000.00435Tutup Pipa 2"bhRp4,000.00436Tutup Pipa 2,5"bhRp5,000.00437Tutup Pipa 3"bhRp5,000.00438Tutup Pipa 3,5"bhRp6,000.00439Tutup Pipa 4"bhRp6,000.00440Tutup Pipa 4,5"bhRp7,000.00441Tutup Pipa 5"bhRp7,000.00442Tutup Pipa 5,5"bhRp8,000.00443Tutup Pipa 6"bhRp9,000.00444Tutup Pipa 6,5"bhRp10,000.00445Tutup Pipa 7"bhRp11,000.00446Tutup Pipa 7,5"bhRp12,000.00447Tutup Pipa 8"bhRp13,000.00448Wiremesh M6batangRp281,000.00449Wiremesh M8batangRp514,000.00

Depok, Juni 2008KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, MTNIP. 480 108 121Depok, Juni 2008KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, MTNIP. 480 108 121

Sewa AlatDAFTAR HARGA SATUAN SEWA PERALATAN PER JAM KERJATAHUN ANGGARAN 2010NO.ALATKODEKAPASITAS ALATHARGA SATUANKETERANGAN1BULLDOZERE-001110HpRp188,000.002MOTOR GRADERE-010110HpRp188,000.003CRUSHER/SCR 30 T/HE-03130 T/jam - 185 HpRp249,000.004SCREENING PLANTE-040-Rp125,000.005LOADER WHEELEDE-052115.0HpRp188,000.006ROLLER, 3 WHEELEDE-0806 - 8TonRp75,900.007ROLLER, TANDEME-0816 - 8TonRp113,000.008ROLLER, VIBR. SELF-P6-7TE-082Rp125,000.009ROLLER, PNEUMATICE-0846 - 15TonRp156,000.0010ROLLER, VIBR. PED 1 TONEE-0871TonRp63,000.0011TAMPER, VIBR. PLATEE-0884HpRp38,000.00A12CONCRETE VIBRATORE-089-Rp31,000.0013SPRAYER, SELFPROPE-1531,000.0LiterRp112,960.6614ASP. SPRAYER, TOWEDE-1546.0TonRp38,000.0015ASP. MIXING PLANT 30 T/HE-15530T/jamRp400,000.00Rp3,901,523.7116ASPHALT FINISHERE-1571820 mm/ 30 HpRp188,000.0017WATER TANK TRUCKE-1824,000.0LiterRp163,000.0018TRAILER, TOWEDE-19110.0TonRp438,000.00Harga dasarRp43,750.0019DUMP TRUCK 3.5 TE-2113.5TonRp163,000.0020DUMP TRUCK 5 TE-2125 Ton/ 145 HpRp188,000.0021FLATBED TRUCK 3.5 TE-2213,5 Ton/ 115 HpRp163,000.0022FLATBED TRUCK WITH CRANEE-225-Rp313,000.0023CONCRETE MIXER 0.125 M3E-251125LiterRp63,000.00Per HariRp7,228.5724COMPRESSOR, AIRE-301210M3/jamRp81,000.0025PUMP, WATER (5 CM)E-34130M3/jamRp63,000.0026CONCRETE MIXER 0.25 M3E-252250LiterRp38,000.0027CONCRETE MIXER 0.5 M3E-253500LiterRp63,000.0028BLOWERE--Rp16,802.5729MESIN CUTTER CONCRETEJam/mRp44,714.29Rp44,714.29

UpahDAFTAR HARGA SATUAN UPAH PEKERJADINAS BINA MARGA DAN SUMBER DAYA AIRNOKOMPONENUPAH / HARIKETERANGAN1PEKERJA40,000.001 ORANG/ HR/ 8 JAM2PEKERJA SETENGAH TERAMPIL40,000.001 ORANG/ HR/ 8 JAM3PEKERJA TERAMPIL50,000.001 ORANG/ HR/ 8 JAM4TUKANG GALI40,000.001 ORANG/ HR/ 8 JAM5TUKANG BATU SETENGAH TERAMPIL45,000.001 ORANG/ HR/ 8 JAM6TUKANG BATU TERAMPIL50,000.001 ORANG/ HR/ 8 JAM7KEPALA TUKANG BATU55,000.001 ORANG/ HR/ 8 JAM8TUKANG KAYU SETENGAH TERAMPIL45,000.001 ORANG/ HR/ 8 JAM9TUKANG KAYU TERAMPIL50,000.001 ORANG/ HR/ 8 JAM10KEPALA TUKANG KAYU55,000.001 ORANG/ HR/ 8 JAM11TUKANG CAT / PELITUR SETENGAH TERAMPIL45,000.001 ORANG/ HR/ 8 JAM12TUKANG CAT / PELITUR TERAMPIL50,000.001 ORANG/ HR/ 8 JAMA13KEPALA TUKANG CAT / PELITUR55,000.001 ORANG/ HR/ 8 JAM14TUKANG BESI BETON SETENGAH TERAMPIL45,000.001 ORANG/ HR/ 8 JAM15TUKANG BESI BETON TERAMPIL50,000.001 ORANG/ HR/ 8 JAM16KEPALA TUKANG BESI BETON55,000.001 ORANG/ HR/ 8 JAM17TUKANG BESI PROFIL SETENGAH TERAMPIL60,000.001 ORANG/ HR/ 8 JAM18TUKANG BESI PROFIL TERAMPIL65,000.001 ORANG/ HR/ 8 JAM19KEPALA TUKANG BESI PROFIL70,000.001 ORANG/ HR/ 8 JAM20MANDOR85,000.001 ORANG/ HR/ 8 JAM21OPERATOR ALAT BESAR65,000.001 ORANG/ HR/ 8 JAM22PEMBANTU OPERATOR / MEKANIK45,000.001 ORANG/ HR/ 8 JAM23SUPIR TRUK50,000.001 ORANG/ HR/ 8 JAM24KENEK TRUK35,000.001 ORANG/ HR/ 8 JAM25PENJAGA MALAM50,000.001 ORANG/ HR/ 8 JAM26PETUGAS HARIAN TETAP BIDANG KEBERSIHAN, KETERTIBAN PASAR DAN MAKAM50,000.001 ORANG/ HR/ 8 JAM27PHT PEMELIHARAAN RUAS JALAN50,000.001 ORANG/ HR/ 8 JAM28SATGAS KEBERSIHAN/PENGANGKATAN SAMPAH DI SALURAN KALI60,000.001 ORANG/ HR/ 8 JAMCATATAN :*OPERATOR YANG SUDAH BIASA DAN TRAMPIL MENGOPERASIKAN JENIS PERALATANUNTUK MELAYANI PEKERJAAN BERAT : BULLDOZER, MOTOR GRADER, LOADER WHEEL,ASPHALT FINISHER, DAN LAIN- LAIN**OPERATOR YANG MENGOPERASIKAN JENIS PERALATAN UNTUK MELAYANI PEKERJAAN YANG AGAK RINGAN :STEEL WHEELED ROLLER, STAMPER, MACHANICAL RAMMER,MECHANICAL RAMMER CONCRETE MIXER/MESIN PENGADUK BETON

Precast542813115165195195428131151651951954281311516519519HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 40 X 40 + supportM'1.00Rp.433,333.33Rp.433,333.33Rp.433,333.330.83333333330.76054664290.1666666667B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.1,500.00Rp.1,500.001101839.0625Pek. Galian TanahM30.61SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.04D 21Rp.31,103.16Rp.1,244.133Pas. Bedding Pasir tb. 10 CmM30.05D 13Rp.208,120.00Rp.10,406.00A4Pek. Penempatan & Penyetelan U - DitchM'1.00Rp.30,400.00Rp.30,400.005Pek. Urugan Tanah Sisi U - DitChM30.32D 11Rp.10,224.50Rp.3,271.846Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.32D 21Rp.31,103.16Rp.9,953.01Rp.56,774.98Buangan Tanah Sisa GalianM30.35SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.Rp.0.060000595007700060,000.0059,500.0077,000.00JUMLAH TOTAL :Rp.490,108.31(194,108.31)PEMBULATANRp.490,109.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 50 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 50 X 50 + supportM'1.00Rp.643,333.33Rp.643,333.33Rp.643,333.331.66B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.1,500.00Rp.1,500.00Pek. Galian TanahM30.81SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.06D 21Rp.31,103.16Rp.1,866.193Pas. Bedding Pasir tb. 10 CmM30.06D 13Rp.208,120.00Rp.12,487.204Pek. Penempatan & Penyetelan U - DitchM'1.00Rp.45,100.00Rp.45,100.005Pek. Urugan Tanah Sisi U - DitchM30.32D 11Rp.10,224.50Rp.3,271.846Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.32D 21Rp.31,103.16Rp.9,953.01Rp.74,178.24Buangan Tanah Sisa GalianM30.81SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.Rp.0.073200740009400073,200.0074,000.00094,000.00JUMLAH TOTAL :Rp.717,511.57PEMBULATANRp.717,512.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 60 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 60 X 60 + supportM'1.00LsRp.765,833.33Rp.765,833.33Rp.765,833.331.66B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM31.09SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.08D 21Rp.31,103.16Rp.2,488.253Pas. Bedding Pasir tb. 10 CmM30.08D 13Rp.208,120.00Rp.16,649.604Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.53,700.00Rp.53,700.005Pek. Urugan Tanah Sisi U - DitchM30.45D 11Rp.10,224.50Rp.4,601.036Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.45D 21Rp.31,103.16Rp.13,996.42Rp.93,435.30Buangan Tanah Sisa GalianM31.09SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.Rp.0.0900009000011000090,000.00090,000.000110,000.00JUMLAH TOTAL :Rp.859,268.63PEMBULATANRp.859,269.00.0JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 80 X 80 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 80 X 80 + supportM'1.00LsRp.1,167,083.33Rp.1,167,083.33Rp.1,167,083.331.66B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM31.57SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.10D 21Rp.31,103.16Rp.3,110.323Pas. Bedding Pasir tb. 10 CmM30.10D 13Rp.208,120.00Rp.20,812.004Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.81,700.00Rp.81,700.005Pek. Urugan Tanah Sisi U - DitchM30.94D 11Rp.10,224.50Rp.9,621.256Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.94D 21Rp.31,103.16Rp.29,236.97Rp.146,480.54Buangan Tanah Sisa GalianM31.57SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0Rp.124500123000162000124,500.00123,000.00162,000.000JUMLAH TOTAL :Rp.1,313,563.87PEMBULATAN :Rp.1,313,564.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKDAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 100 X 100 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 100 X 100 + supportM'1.00Rp.2,082,458.33Rp.2,082,458.33Rp.2,082,458.33B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.002Pek. Galian TanahM32.23D 01Rp.35,337.50Rp.78,625.943Pek. Pemadatan Tanah (dg alat)M30.32D 21Rp.31,103.16Rp.9,953.014Pas. Bedding Pasir tb. 10 CmM30.32D 13Rp.208,120.00Rp.66,598.405Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.145,800.00Rp.145,800.006Pek. Urugan Tanah Sisi U - DitchM31.20D 11Rp.10,224.50Rp.12,269.407Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M31.20D 21Rp.31,103.16Rp.37,323.79Buangan Tanah Sisa GalianM32.23SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.764.44Rp.764.44Rp.353,334.98185000185000192000(168,334.98)185,000.00192,000.0000JUMLAH TOTAL :Rp.2,435,793.31.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 60 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 40 X 60 + supportM'1.00LsRp.542,500.00Rp.542,500.00Rp.542,500.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM32.23SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.06D 21Rp.31,103.16Rp.1,866.193Pas. Bedding Pasir tb. 10 CmM30.06D 13Rp.208,120.00Rp.12,487.204Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.38,000.00Rp.38,000.005Pek. Urugan Tanah Sisi U - DitchM30.71D 11Rp.10,224.50Rp.7,259.406Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.71D 21Rp.31,103.16Rp.22,083.24Rp.83,696.03Buangan Tanah Sisa GalianM32.23SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0690006800069,000.00068,000.000JUMLAH TOTAL :Rp.626,196.03115,147.00(81,119.67)PEMBULATAN :Rp.626,197.00147,107.00(104,926.33).0JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 70 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 50 X 70 + supportM'1.00Rp.794,166.67Rp.794,166.67Rp.794,166.67B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM32.23SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.06D 21Rp.31,103.16Rp.1,866.193Pas. Bedding Pasir tb. 10 CmM30.06D 13Rp.208,120.00Rp.12,487.204Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.47,700.00Rp.47,700.005Pek. Urugan Tanah Sisi U - DitchM30.71D 11Rp.10,224.50Rp.7,259.406Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.71D 21Rp.31,103.16Rp.22,083.24Rp.93,396.03Buangan Tanah Sisa GalianM32.23SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0900009000090,000.00090,000.000JUMLAH TOTAL :Rp.887,562.69146,427.00(103,839.67)PEMBULATAN :Rp.887,563.00201,280.00(144,320.00).DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 70 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 60 X 70 + supportM'1.00LsRp.838,333.33Rp.838,333.33Rp.838,333.33B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.90SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.13D 21Rp.31,103.16Rp.4,167.823Pas. Bedding Pasir tb. 10 CmM30.13D 13Rp.208,120.00Rp.27,888.084Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.50,300.00Rp.50,300.005Pek. Urugan Tanah Sisi U - DitchM30.64D 11Rp.10,224.50Rp.6,543.686Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.64D 21Rp.31,103.16Rp.19,906.02Rp.110,805.61Buangan Tanah Sisa GalianM30.90SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0960009600096,000.00096,000.000JUMLAH TOTAL :Rp.949,138.94175,100.00(125,533.33)PEMBULATAN :Rp.949,139.00254,773.00(179,093.67).DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 60 X 80 + supportM'1.00LsRp.914,166.67Rp.914,166.67Rp.914,166.67B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.95SNI-T1Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.14D 21Rp.31,103.16Rp.4,354.443Pas. Bedding Pasir tb. 10 CmM30.14D 13Rp.208,120.00Rp.29,136.804Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.54,900.00Rp.54,900.005Pek. Urugan Tanah Sisi U - DitchM30.78D 11Rp.10,224.50Rp.7,975.116Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.78D 21Rp.31,103.16Rp.24,260.46Rp.122,626.82Buangan Tanah Sisa GalianM30.95SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0100000100000100,000.000100,000.000JUMLAH TOTAL :Rp.1,036,793.48225,420.00(154,480.00)PEMBULATAN :Rp.1,036,794.00347,933.00(237,033.67)..0JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 40 X 40 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 40 X 40M'1.00Rp.302,500.00Rp.302,500.00Rp.302,500.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.61D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.05D 21Rp.31,103.16Rp.1,555.163Pas. Bedding Pasir tb. 10 CmM30.05D 13Rp.208,120.00Rp.10,406.004Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.21,200.0021,200.005Pek. Urugan Tanah Sisi U - DitchM30.32D 11Rp.10,224.50Rp.3,271.846Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.32D 21Rp.31,103.16Rp.9,953.01Rp.48,386.01Buangan Tanah Sisa GalianM30.61D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0Rp.JUMLAH TOTAL :Rp.350,886.01PEMBULATANRp.350,887.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMASANGANCOVER U-DITCH PRECAST UK. 100 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTAL1Cover Light Duty U - Ditch 100M'1.00LsRp.540,500.00Rp.540,500.002Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.37,900.00Rp.37,900.004.36666666675Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.578,400.001Cover Heavy Duty U - Ditch 100M'1.00LsRp.697,500.00Rp.697,500.002Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.48,900.00Rp.48,900.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.746,400.00PAS . COVER LIGHT DUTY UK. 100/M'Rp.578,400.00333,653.00(244,747.00)PAS . COVER HEAVY DUTY UK. 100/M'Rp.746,400.00434,973.00(311,427.00)DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 50 X 50 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 50 X 50M'1.00Rp.450,000.00Rp.450,000.00Rp.450,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.81D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.07D 21Rp.31,103.16Rp.2,177.223Pas. Bedding Pasir tb. 10 CmM30.07D 13Rp.208,120.00Rp.14,568.404Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.31,500.00Rp.31,500.005Pek. Urugan Tanah Sisi U - DitchM30.38D 11Rp.10,224.50Rp.3,885.316Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.38D 21Rp.31,103.16Rp.11,819.20Rp.65,950.13Buangan Tanah Sisa GalianM30.81D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.515,950.13PEMBULATANRp.515,951.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP. UK. 60 X 60 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Dicth 60 X 60M'1.00Rp.534,166.67Rp.534,166.67Rp.534,166.67B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM31.09D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.07D 21Rp.31,103.16Rp.2,301.633Pas. Bedding Pasir tb. 10 CmM30.07D 13Rp.208,120.00Rp.15,400.884Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.37,400.00Rp.37,400.005Pek. Urugan Tanah Sisi U - DitchM30.52D 11Rp.10,224.50Rp.5,316.746Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.52D 21Rp.31,103.16Rp.16,173.64Rp.78,592.90Buangan Tanah Sisa GalianM31.09D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.612,759.56PEMBULATANRp.612,760.000JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 80 X 80 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 80 X 80M'1.00LsRp.805,000.00Rp.805,000.00Rp.805,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,500.00Rp.2,500.00Pek. Galian TanahM31.57D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.10D 21Rp.31,103.16Rp.3,110.323Pas. Bedding Pasir tb. 10 CmM30.10D 13Rp.208,120.00Rp.20,812.004Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.56,400.00Rp.56,400.005Pek. Urugan Tanah Sisi U - DitchM30.94D 11Rp.10,224.50Rp.9,621.256Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.94D 21Rp.31,103.16Rp.29,236.97Rp.121,680.54Buangan Tanah Sisa GalianM31.57D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.926,680.54PEMBULATANRp.926,681.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 100 X 100 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 100 X 100M'1.00Rp.1,377,500.00Rp.1,377,500.00Rp.1,377,500.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,500.00Rp.2,500.002Pek. Galian TanahM32.23D 01Rp.31,075.00Rp.69,141.883Pek. Pemadatan Tanah (dg alat)M30.32D 21Rp.31,103.16Rp.9,953.014Pas. Bedding Pasir tb. 10 CmM30.32D 13Rp.208,120.00Rp.66,598.405Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.96,500.00Rp.96,500.006Pek. Urugan Tanah Sisi U - DitchM31.20D 11Rp.10,224.50Rp.12,269.407Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M31.20D 21Rp.31,103.16Rp.37,323.79Rp.294,286.48Buangan Tanah Sisa GalianM32.23SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0Rp.JUMLAH TOTAL :Rp.1,671,786.48PEMBULATAN :Rp.1,671,787.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKDAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 40 X 60 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 40 X 60M'1.00LsRp.380,833.33Rp.380,833.33Rp.380,833.33B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.75D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.06D 21Rp.31,103.16Rp.1,866.193Pas. Bedding Pasir tb. 10 CmM30.06D 13Rp.208,120.00Rp.12,487.204Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.26,700.00Rp.26,700.005Pek. Urugan Tanah Sisi U - DitchM30.71D 11Rp.10,224.50Rp.7,249.176Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.32D 21Rp.31,103.16Rp.9,953.01Rp.60,255.57Buangan Tanah Sisa GalianM30.75SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0Rp.JUMLAH TOTAL :Rp.441,088.90PEMBULATAN :Rp.441,089.00.0JL. MARGONDA RAYA NO. 54 DEPOKDAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 50 X 70 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 50 X 70M'1.00Rp.556,666.67Rp.556,666.67Rp.556,666.67B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.90D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.12D 21Rp.31,103.16Rp.3,732.383Pas. Bedding Pasir tb. 10 CmM30.12D 13Rp.208,120.00Rp.25,806.884Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.39,000.00Rp.39,000.005Pek. Urugan Tanah Sisi U - DitchM30.57D 11Rp.10,224.50Rp.5,827.976Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.57D 21Rp.31,103.16Rp.17,728.80Rp.94,096.03Buangan Tanah Sisa GalianM30.90SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0Rp.JUMLAH TOTAL :Rp.650,762.69PEMBULATAN :Rp.650,763.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKDAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 60 X 70 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 60 X 70M'1.00Rp.587,500.00Rp.587,500.00Rp.587,500.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.1,500.00Rp.1,500.00Pek. Galian TanahM30.90D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.13D 21Rp.31,103.16Rp.4,167.823Pas. Bedding Pasir tb. 10 CmM30.13D 13Rp.208,120.00Rp.27,888.084Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.41,200.00Rp.41,200.005Pek. Urugan Tanah Sisi U - DitchM30.64D 11Rp.10,224.50Rp.6,543.686Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.64D 21Rp.31,103.16Rp.19,906.02Rp.101,205.61Buangan Tanah Sisa GalianM30.90SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.688,705.61PEMBULATAN :Rp.688,706.00.DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKDAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 60 X 80 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. U - Ditch 60 X 80M'1.00Rp.640,000.00Rp.640,000.00Rp.640,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM30.95D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.14D 21Rp.31,103.16Rp.4,354.443Pas. Bedding Pasir tb. 10 CmM30.14D 13Rp.208,120.00Rp.29,136.804Pek. Penempatan & Penyetelan U - DitchM'1.00LsRp.44,800.00Rp.44,800.005Pek. Urugan Tanah Sisi U - DitchM30.78D 11Rp.10,224.50Rp.7,975.116Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)M30.78D 21Rp.31,103.16Rp.24,260.46Rp.112,526.82Buangan Tanah Sisa GalianM30.95SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.752,526.82PEMBULATAN :Rp.752,527.000JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEKERJAANBOX CULVERT BETON BERTULANG PRECAST UK. 40 X 40 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. Box Culvert 40 X 40 (heavy duty)M'1.00LsRp.838,000.00Rp.838,000.00Rp.838,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM31.18D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.06D 21Rp.31,103.16Rp.1,803.983Pas. Bedding Pasir tb. 10 CmM30.06D 13Rp.208,120.00Rp.12,070.964Pek. Penempatan & Penyetelan Box CulvertM'1.00LsRp.58,700.00Rp.58,700.005Pek. Urugan Tanah Sisi Box CulvertM30.20D 11Rp.10,224.50Rp.2,044.906Pek. Pemadatan Tanah Sisi Box Culvert (dg alat)M30.20D 21Rp.31,103.16Rp.6,220.63Rp.82,840.48Buangan Tanah Sisa GalianM30.98D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.920,840.48PEMBULATAN :Rp.920,841.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEKERJAANBOX CULVERT BETON BERTULANG PRECAST, UK. 50 X 50 / 1M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. Box Culvert 50 X 50 (heavy duty)M'1.00LsRp.964,000.00Rp.964,000.00Rp.964,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM31.30D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.07D 21Rp.31,103.16Rp.2,115.013Pas. Bedding Pasir tb. 10 CmM30.07D 13Rp.208,120.00Rp.14,152.164Pek. Penempatan & Penyetelan Box CulvertM'1.00LsRp.67,500.00Rp.67,500.005Pek. Urugan Tanah Sisi Box CulvertM30.40D 11Rp.10,224.50Rp.4,089.806Pek. Pemadatan Tanah Sisi Box Culvert (dg alat)M30.40D 21Rp.31,103.16Rp.12,441.26Rp.102,298.24Buangan Tanah Sisa GalianM31.30D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.1,066,298.24PEMBULATAN :Rp.1,066,299.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEKERJAANPEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 60 X 60 / 1M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. Box Culvert 60 X 60 (heavy duty)M'1.00LsRp.1,265,000.00Rp.1,265,000.00Rp.1,265,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,000.00Rp.2,000.00Pek. Galian TanahM31.42D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M30.08D 21Rp.31,103.16Rp.2,488.253Pas. Bedding Pasir tb. 10 CmM30.08D 13Rp.208,120.00Rp.17,065.844Pek. Penempatan & Penyetelan Box CulvertM'1.00LsRp.88,600.00Rp.88,600.005Pek. Urugan Tanah Sisi Box CulvertM30.62D 11Rp.10,224.50Rp.6,339.196Pek. Pemadatan Tanah Sisi Box Culvert (dg alat)M30.62D 21Rp.31,103.16Rp.19,283.96Rp.135,777.24Buangan Tanah Sisa GalianM31.42D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.1,400,777.24PEMBULATAN :Rp.1,400,778.000JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEKERJAANPEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 80 X 80 / 1M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. Box Culvert 80 X 80 (heavy duty)M'1.00Rp.2,339,000.00Rp.2,339,000.00Rp.2,339,000.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,500.00Rp.2,500.00Pek. Galian TanahM31.70D 01Rp.0.0Rp.0.02Pek. Pemadatan Tanah (dg alat)M31.10D 21Rp.31,103.16Rp.34,213.483Pas. Bedding Pasir tb. 10 CmM30.12D 13Rp.208,120.00Rp.24,974.404Pek. Penempatan & Penyetelan Box CulvertM'1.00LsRp.163,800.00Rp.163,800.005Pek. Urugan Tanah Sisi Box CulvertM30.61D 11Rp.10,224.50Rp.6,267.626Pek. Pemadatan Tanah Sisi Box Culvert (dg alat)M30.84D 21Rp.31,103.16Rp.26,126.65Rp.257,882.15Buangan Tanah Sisa GalianM31.70D 10Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.0.0Rp.0.0JUMLAH TOTAL :Rp.2,596,882.15PEMBULATAN :Rp.2,596,883.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEKERJAANBOX CULVERT BETON BERTULANG PRECAST, UK. 100 X 100 / 1M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTALA.Supply Material1Keb. Box Culvert 100 X 100 (heavy duty)M'1.00LsRp.2,854,700.00Rp.2,854,700.00Rp.2,854,700.00B.Pemasangan Material1Pembersihan Lahan Lokasi KerjaM'1.00LsRp.2,500.00Rp.2,500.00Pek. Galian TanahM31.90D 01Rp.31,075.00Rp.59,042.502Pek. Pemadatan Tanah (dg alat)M31.30D 21Rp.31,103.16Rp.40,434.113Pas. Bedding Pasir tb. 10 CmM30.13D 13Rp.208,120.00Rp.27,055.604Pek. Penempatan & Penyetelan Box CulvertM'1.00LsRp.199,900.00Rp.199,900.005Pek. Urugan Tanah Sisi Box CulvertM31.20D 11Rp.10,224.50Rp.12,269.406Pek. Pemadatan Tanah Sisi Box Culvert (dg alat)M31.20D 21Rp.31,103.16Rp.37,323.79Rp.378,525.40Buangan Tanah Sisa GalianM31.90SNI-T8Rp.0.0Rp.0.07Pemberesan LapanganLs1.00LsRp.633.62Rp.633.62JUMLAH TOTAL :Rp.3,233,225.40PEMBULATAN :Rp.3,233,226.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMASANGANCOVER U-DITCH PRECAST UK. 40 / 1 M'0.1666666667NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTAL1Cover Light Duty U - Ditch 40M'1.00Rp.181,666.67Rp.181,666.671.66666666672Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.14,600.00Rp.14,600.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.196,266.671Cover Heavy Duty U - Ditch 40M'1.00Rp.233,333.33Rp.233,333.332Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.18,700.00Rp.18,700.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.252,033.33PAS . COVER LIGHT DUTY UK. 40/M'Rp.196,266.67PAS . COVER HEAVY DUTY UK. 40/M'Rp.252,033.330JL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMASANGANCOVER U-DITCH PRECAST UK. 50 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTAL1Cover Light Duty U - Ditch 50M'1.00Rp.231,666.67Rp.231,666.672Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.18,600.00Rp.18,600.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.250,266.671Cover Heavy Duty U - Ditch 50M'1.00Rp.320,000.00Rp.320,000.002Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.25,600.00Rp.25,600.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.345,600.00PAS . COVER LIGHT DUTY UK. 50/M'Rp.250,266.67PAS . COVER HEAVY DUTY UK. 50/M'Rp.345,600.00DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMASANGANCOVER U-DITCH PRECAST UK. 60 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTAL1Cover Light Duty U - Ditch 60M'1.00LsRp.278,333.33Rp.278,333.332Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.22,300.00Rp.22,300.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.300,633.331Cover Heavy Duty U - Ditch 60M'1.00LsRp.401,666.67Rp.401,666.672Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.32,200.00Rp.32,200.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.433,866.67PAS . COVER LIGHT DUTY UK. 60/M'Rp.300,633.33PAS . COVER HEAVY DUTY UK. 60/M'Rp.433,866.67DINAS PEKERJAAN UMUM KOTA DEPOKJL. MARGONDA RAYA NO. 54 DEPOKHARGA SATUAN PEMASANGANCOVER U-DITCH PRECAST UK. 80 / 1 M'NOURAIAN PEKERJAANSAT.VOLUMEKODEHARGA SAT.JUMLAHSUB TOTAL1Cover Light Duty U - Ditch 80M'1.00LsRp.355,000.00Rp.355,000.002Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.24,900.00Rp.24,900.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.379,900.001Cover Heavy Duty U - Ditch 80M'1.00LsRp.546,666.67Rp.546,666.672Pek. PengukuranM'0.0LsRp.0.0Rp.0.03Pek. Perataan PerletakanM'0.0LsRp.0.0Rp.0.04Pemasangan Handling / UnhandlingM'1.00LsRp.38,300.00Rp.38,300.005Perawatan dan PembersihanM'0.0LsRp.0.0Rp.0.0Rp.584,966.67PAS . COVER LIGHT DUTY UK. 80/M'Rp.379,900.00PAS . COVER HEAVY DUTY UK. 80/M'Rp.584,966.67KEPALA DINAS BINA MARGA DAN SUMBER DAYA AIRKOTA DEPOKIr. H. HERMAN HIDAYAT, MTNIP.

Depok, Juni 2008KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, MTNIP. 480 108 121Depok, Juni 2008KEPALA DINAS PEKERJAAN UMUMKOTA DEPOK

Ir. HERMAN HIDAYAT, MTNIP. 480 108 121

Penjabaran Analisa1DAFTAR ANALISA SATUAN PEKERJAANTAHUN ANGGARAN 2010NOURAIANVOL.SAT.HARGA SAT.JUMLAH123456 = ( 3 x 5 )DibulatkanC 011 M3 BONGKARAN BETON BERTULANGPekerja6.6670oh40,000.00266,680.00Mandor0.3330oh85,000.0028,305.00Jumlah294,985.00Jasa 10%29,498.50Jumlah Total324,483.50Dibulatkan324,484.00D 011 M3 GALIAN TANAH BIASA SEDALAM 1 MPekerja0.7500oh40,000.0030,000.00ATukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0250oh85,000.002,125.00Jumlah32,125.00Jasa 10%3,212.50Jumlah Total35,337.50Dibulatkan35,338.00D 021 M3 GALIAN TANAH BIASA SEDALAM 2 MPekerja0.9000oh40,000.0036,000.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0450oh85,000.003,825.00Jumlah39,825.00Jasa 10%3,982.50Jumlah Total43,807.50Dibulatkan43,808.00D 031 M3 GALIAN TANAH BIASA SEDALAM 3 MPekerja1.0500oh40,000.0042,000.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0670oh85,000.005,695.00Jumlah47,695.00Jasa 10%4,769.50Jumlah Total52,464.50Dibulatkan52,465.00D 061 M3 GALIAN TANAH KERAS SEDALAM 1 MPekerja1.0000oh40,000.0040,000.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0320oh85,000.002,720.00Jumlah42,720.00Jasa 10%4,272.00Jumlah Total46,992.00Dibulatkan46,992.00D 081 M3 GALIAN TANAH LUMPUR SEDALAM 1 MPekerja1.2000oh40,000.0048,000.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0450oh85,000.003,825.00Jumlah51,825.00Jasa 10%5,182.50Jumlah Total57,007.50Dibulatkan57,008.00D 101 M3 PEMBUANGAN TANAH SEJAUH 30 MPekerja0.3300oh40,000.0013,200.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0100oh85,000.00850.00Jumlah14,050.00Jasa 10%1,405.00Jumlah Total15,455.00Dibulatkan15,455.00D 111 M3 PERATAAN TANAHPekerja0.1920oh40,000.007,680.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0190oh85,000.001,615.00Jumlah9,295.00Jasa 10%929.50Jumlah Total10,224.50Dibulatkan10,225.00D 121 M3 PEMADATAN TANAH (PER 20 CM)Pekerja0.5000oh40,000.0020,000.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh55,000.000.0Mandor0.0500oh85,000.004,250.00Jumlah24,250.00Jasa 10%2,425.00Jumlah Total26,675.00Dibulatkan26,675.00D 131 M3 URUGAN PASIRPasir urug1.2000m3147,000.00176,400.00Pekerja0.3000oh40,000.0012,000.00Tukang Gali0.0oh35,000.000.0Kepala Tukang0.0oh40,000.000.0Mandor0.0100oh80,000.00800.00Jumlah189,200.00Jasa 10%18,920.00Jumlah Total208,120.00Dibulatkan208,120.00SNI-PD51 M3 PASANG PONDASI BATU BELAH 1 PC : 4 PSBatu belah1.2000m3158,000.00189,600.00Semen Portland3.2600Zak61,000.00198,860.003.26Pasir pasang0.5200m3189,000.0098,280.00Pekerja1.5000oh40,000.0060,000.00Tukang Batu Terampil0.7500oh50,000.0037,500.00Kepala Tukang0.0750oh55,000.004,125.00Mandor0.0750oh80,000.006,000.00Jumlah594,365.00Jasa 10%59,436.50Jumlah Total653,801.50Dibulatkan653,802.00Asumsi :Waktu memuat = 4 menitKap. produksi / jam =1.245m3Waktu mengaduk = 2 menitKoef. alat / m3 =0.803jamWaktu tuang = 2 menit3.1130.3213Waktu tunggu, dll = 2 menit30 m3/jam3.50mntE 111 M3 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)Batu belah 10-15 cm1.1000m3158,000.00173,800.00Semen Portland3.2600zak61,000.00198,860.00Pasir pasang0.5200m3189,000.0098,280.00Pekerja1.5000oh40,000.0060,000.00Tukang Batu Terampil0.6000oh50,000.0030,000.00Kepala Tukang0.0600oh55,000.003,300.00Mandor0.0750oh80,000.006,000.00Operator Concrete Mixer0.0500oh65,000.003,250.00Concrete Mixer 0.25m30.3200jam38,000.0012,160.00Waterpump 50 mm0.3200jam63,000.0020,160.00Jumlah605,810.00Jasa 10%60,581.00Jumlah Total666,391.00J 041 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MMSemen Portland0.1555Zak61,000.009,486.722.65550.15552Pasir pasang0.0230m3189,000.004,347.000.0031104Pekerja0.3000oh40,000.0012,000.000.1598896Tukang Batu Terampil0.1500oh50,000.007,500.00Kepala Tukang0.0150oh55,000.00825.00Mandor0.0150oh80,000.001,200.00Jumlah35,358.72Jasa 10%3,535.87Jumlah Total38,894.59Dibulatkan38,895.00Dibulatkan39,810.00I 021 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPERKayu Kamper Singil, balok0.0195m33,354,800.0065,418.600.07Kayu Kamper Singil, papan0.0070m36,195,000.0043,365.00142.8571428571Paku biasa 2" - 5"0.1000kg18,000.001,800.0035.7142857143Pekerja0.1500oh50,000.007,500.00Tukang Kayu Terampil0.4500oh50,000.0022,500.00Kepala Tukang0.0450oh55,000.002,475.00Mandor0.0750oh80,000.006,000.00Jumlah149,058.60Jasa 10%14,905.86Jumlah Total163,964.46Dibulatkan163,965.00I 031 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEOKayu Borneo, balok0.0195m32,100,000.0040,950.00Kayu Borneo, papan0.0070m32,205,000.0015,435.00Paku biasa 2" - 5"0.1000kg18,000.001,800.00Pekerja0.1500oh40,000.006,000.00Tukang Kayu Terampil0.4500oh50,000.0022,500.00Kepala Tukang0.0450oh55,000.002,475.00Mandor0.0750oh80,000.006,000.00Jumlah95,160.00Jasa 10%9,516.00Jumlah Total104,676.00Dibulatkan104,676.00I 041 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPERKayu Kamper Singil, balok0.0195m33,354,800.0065,418.60Kayu Kamper Singil, papan0.0070m36,195,000.0043,365.00Paku biasa 2" - 5"0.1000kg18,000.001,800.00Lem kayu0.5600ltr47,000.0026,320.00Teakwood 4' x 8' x 4 mm1.0000lbr122,300.00122,300.00Pekerja0.2000oh40,000.008,000.00Tukang Kayu Terampil0.6000oh50,000.0030,000.00Kepala Tukang0.0600oh55,000.003,300.00Mandor0.0100oh80,000.00800.00Jumlah301,303.60Jasa 10%30,130.36Jumlah Total331,433.96Dibulatkan331,434.00I 051 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPERKayu Kamper Singil, balok0.0195m33,354,800.0065,418.60Kayu Kamper Singil, papan0.0070m36,195,000.0043,365.00Paku biasa 2" - 5"0.1000kg18,000.001,800.00Lem kayu0.5600ltr47,000.0026,320.00Plywood 4' x 8' x 4 mm1.0000lbr262,100.00262,100.00Pekerja0.2000oh40,000.008,000.00Tukang Kayu Terampil0.6000oh50,000.0030,000.00Kepala Tukang0.0600oh55,000.003,300.00Mandor0.0100oh80,000.00800.00Jumlah441,103.60Jasa 10%44,110.36Jumlah Total485,213.96Dibulatkan485,214.00Dibulatkan47,472.00H 141 M2 PASANG ATAP SENG GELOMBANGSeng gelombang 3' x 6' bjls 300.7000lbr63,000.0044,100.007.5Paku biasa 1/2" - 1"0.0200kg18,000.00360.0015Pekerja0.1200oh40,000.004,800.0090Tukang Kayu Terampil0.0600oh50,000.003,000.00180Kepala Tukang0.0060oh55,000.00330.00Mandor0.0060oh80,000.00480.00Jumlah53,070.00Jasa 10%5,307.00Jumlah Total58,377.00Dibulatkan58,377.00SNI-CAT81 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUPCat meni0.2000kg21,000.004,200.00Dempul kayu0.1500kg42,000.006,300.00Cat dasar0.1700kg50,000.008,500.00Cat penutup 2 kali0.2600kg50,000.0013,000.00Pekerja0.0700oh40,000.002,800.00Tukang Cat Terampil0.0090oh50,000.00450.00Kepala Tukang0.0060oh55,000.00330.00Mandor0.0025oh80,000.00200.00Jumlah35,780.00Jasa 10%3,578.00Jumlah Total39,358.00Dibulatkan39,358.00SNI-CAT141 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)Plamir0.1000kg16,590.001,659.00Cat dasar0.1000kg50,000.005,000.00Cat penutup 2 kali0.2600kg50,000.0013,000.00Pekerja0.0200oh40,000.00800.00Tukang Cat Terampil0.0630oh50,000.003,150.00Kepala Tukang0.0063oh55,000.00346.50Mandor0.0025oh80,000.00200.00Jumlah24,155.50Jasa 10%2,415.55Jumlah Total26,571.05Dibulatkan26,572.00DibulatkanDibulatkan106,850.00DibulatkanDibulatkan95,850.00Dibulatkan00PLH. KA BID BINA PROGRAM & TEKNISDINAS PEKERJAAN UMUMIr. H. ENCO KURYASA, MMNIP. 110 033 1750PLT. KEPALA DINAS PEKERJAAN UMUM0KOTA DEPOKDrs. OKA BARMARA SR, M.SiNIP. 480 115 207

Penjabaran Analisa 2DAFTAR ANALISA SATUAN PEKERJAANTAHUN ANGGARAN 2010NOURAIANVOL.SAT.HARGA SAT.JUMLAH123456 = ( 3 x 5 )A 021 M1 PEK. PASANGAN BOUWPLANKKayu Borneo Super0.0100m32,100,000.0021,000.00Paku0.0380kg18,000.00684.00Ongkos Pasang0.1550oh21,684.003,361.02Jumlah25,045.02Jasa 10%2,504.50Jumlah Total27,549.52Dibulatkan27,540.00A 041 M2 PEK. KANTOR DIREKSIKayu Borneo Super0.1000m2,100,000.00210,000.00APaku0.2500kg18,000.004,500.00Seng Glb BJLS 301.1000lbr74,000.0081,400.00Triplex 3 mm0.5000lbr47,000.0023,500.00PC (50 kg)0.1000zak61,000.006,100.00Pasir pasang0.2500m189,000.0047,250.00Bata merah Klas I70.0000bh300.0021,000.00Peralatan0.0200lot353,359.507,067.19Ongkos Pasang0.1500ls360,426.6954,064.00Jumlah454,881.19Jasa 10%45,488.12Jumlah500,369.31Dibulatkan500,360.00A 051 M2 PAPAN NAMA PROYEKKayu Borneo Super0.1300m2,100,000.00273,000.00Paku0.2500kg18,000.004,500.00Cat Minyak1.0000ls8,000.008,000.00Penulisan0.1250ls255,304.0031,913.00Ongkos Pasang0.1250ls287,217.0035,902.13Jumlah353,315.13Jasa 10%35,331.51Jumlah388,646.64Dibulatkan388,640.00G 051 M2 PASANGAN BATA MERAH 1 : 3Bata merah70.0000bh300.0021,000.00P.C (50 kg)0.4200zak61,000.0025,620.00Pasir pasang0.0540m189,000.0010,206.00Pekerja setengah trampil0.4290org40,000.0017,160.00Tk. batu setengah trampil0.2140org45,000.009,630.00Kep. Tukang batu0.0210org55,000.001,155.00Mandor0.0110org85,000.00935.00Jumlah85,706.00Jasa 10%8,570.60Jumlah94,276.60G 061 M2 PASANGAN BATA MERAH 1 : 4Bata merah70.0000bh300.0021,000.00P.C (50 kg)0.3354zak61,000.0020,456.96Pasir pasang0.0580m189,000.0010,962.00Pekerja setengah trampil0.3218org40,000.0012,872.00Tk. batu setengah trampil0.1805org45,000.008,122.50Kep. Tukang batu0.0158org55,000.00869.00Mandor0.0083org85,000.00705.50Jumlah74,987.96Jasa 10%7,498.80Jumlah82,486.76H 021 M3 KUDA-KUDA BORNEO SUPERKayu balok Borneo Super1.1000m2,100,000.002,310,000.00Paku5.8000kg18,000.00104,400.00Pekerja setengah terampil3.0000org40,000.00120,000.00Tk. kayu setengah terampil5.0000org45,000.00225,000.00Kep. Tukang kayu2.0000org55,000.00110,000.00Mandor0.4000org85,000.0034,000.00Jumlah2,903,400.00Jasa 10%290,340.00Jumlah Total3,193,740.00H 031 M3 KUDA-KUDA KAMPER KRUINGKayu balok kamper Kruing1.1000m5,040,000.005,544,000.00Paku5.8000kg18,000.00104,400.00Pekerja setengah terampil3.0000org40,000.00120,000.00Tk. kayu setengah terampil5.0000org45,000.00225,000.00Kep. Tukang kayu2.0000org55,000.00110,000.00Mandor0.4000org85,000.0034,000.00Jumlah6,137,400.00Jasa 10%613,740.00Jumlah Total6,751,140.00H 041 M3 KUDA-KUDA KAMPER BANJARKayu balok kamper Banjar1.1000m3,354,800.003,690,280.00Paku5.8000kg18,000.00104,400.00Pekerja setengah terampil3.0000org40,000.00120,000.00Tk. kayu setengah terampil5.0000org45,000.00225,000.00Kep. Tukang kayu2.0000org55,000.00110,000.00Mandor0.4000org85,000.0034,000.00Jumlah4,283,680.00Jasa 10%428,368.00Jumlah Total4,712,048.00J 031 M2 PLESTERAN DINDING 1 : 3 + ACIANP.C (50 kg)0.1600zak61,000.009,760.00Pasir pasang0.0190m3189,000.003,591.00Pekerja setengah trampil0.2860oh40,000.0011,440.00Tk. batu setengah trampil0.2140oh45,000.009,630.00Kep. Tukang batu0.0210oh55,000.001,155.00Mandor0.0200oh85,000.001,700.00Jumlah37,276.00Jasa 10%3,727.60Jumlah Total41,003.60Q 191 M2 PASANGAN PAVING BLOCK NATURAL 8 CMPaving Block Natural 8 cm1.0100m102,900.00103,929.00Pasir Beton0.1000m210,000.0021,000.00Pekerja Setengah Terampil0.2500org40,000.0010,000.00Tukang Batu Setengah Terampil0.5000org45,000.0022,500.00Kepala Tukang Batu0.0250org55,000.001,375.00Mandor0.0030org85,000.00255.00Peralatan1.0000lot3,000.003,000.00Jumlah162,059.00Jasa 10%16,205.90Jumlah Total178,264.90S 011 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUHLempengan Rumput Biasa (Teki)1.2000m31,600.0037,920.00Pekerja Setengah Terampil0.0400org40,000.001,600.00Mandor0.0100org85,000.00850.00Lempeng RumputJumlah40,370.00Jasa 10%4,037.00Jumlah Total44,407.00E 081 M2 PASANGAN SIARAN AD. 1 : 2Pasir Pasang0.0085m3189,000.001,606.50Semen Portland0.1050zak61,000.006,405.00Pekerja0.3600oh40,000.0014,400.00Tukang Batu Terampil0.1200oh50,000.006,000.00Kepala Tukang0.0120oh55,000.00660.00Mandor0.0180oh85,000.001,530.00Jumlah30,601.50Jasa 10%3,060.15Jumlah Total33,661.65R 101 KG MENEMPA GELAGAR BESIBesi Profil1.1000kg9,555.0010,510.50Arang Kayu0.3000kg9,240.002,772.00Pekerja0.0900oh40,000.003,600.00Tukang Besi Terampil0.0900oh50,000.004,500.00Kepala Tukang0.0300oh55,000.001,650.00Jumlah23,032.50Jasa 10%2,303.25Jumlah Total25,335.75R 111 KG PASANG GELAGAR BESIPekerja0.0200oh40,000.00800.00Tukang Besi Terampil0.0050oh50,000.00250.00Jumlah1,050.00Jasa 10%105.00Jumlah Total1,155.00C 041 M3 BONGKARAN DINDING BATAPekerja1.0000oh40,000.0040,000.00Mandor0.0500oh85,000.004,250.00Jumlah44,250.00Jasa 10%4,425.00Jumlah Total48,675.0000PLH. KA BID BINA PROGRAM & TEKNIKDINAS PU KOTA DEPOKIr. H. ENCO KURYASA, MMNIP. 110 033 175PLT. KEPALA DINAS PEKERJAAN UMUM0KOTA DEPOK0Drs. OKA BARMARA SR, M.SiNIP. 480 115 207

Penjabaran Analisa3DAFTAR ANALISA SATUAN PEKERJAANTAHUN ANGGARAN 20103.32m3/jam0.30Asumsi =kecepatan = 0.5 km/jamlebar pemadatan = 0.4 mKap. prod./jam =23.243.3336.972effisiensi = 0.83banyak lintasan = 10Koef. alat /m3 =tebal per lapis = 0.2 mNOURAIANVOL.SAT.HARGA SAT.JUMLAH123456 = ( 3 x 5 )A 071 M' PENGUKURAN DAN PEMASANGAN PATOKKayu 5/7 Borneo0.00002m31,470,000.0036.02Cat Kayu Sieve0.05000kg49,000.002,450.0028.00Tukang Kayu Setengah Terampil0.0020oh45,000.0090.000.036Pekerja0.0020oh40,000.0080.00Mandor0.0010oh85,000.0085.006.50AJumlah2,741.026.70Jasa 10%274.10NO.URAIAN KEGIATAN / SATUANKOEFSAT.HARGA SAT.JUMLAHJumlah Total3,015.12S 061 M' PAS. KISDAM + BONGKARAN (KARUNG)Pekerja Terampil0.6670oh45,000.0030,015.00Mandor0.1670oh85,000.0014,195.00Karung12.0000bh6,195.0074,340.00Tanah urugan0.6720m363,000.0042,336.00Kawat Beton1.0000kg13,000.0013,000.00Kayu Dolken 5-7 cm6.0000btg7,000.0042,000.00Terpal plastik1.1000m'7,000.007,700.00Jumlah223,586.00Jasa 10%22,358.60Jumlah Total245,944.60S 071 M' PAS. KISDAM + BONGKARAN (BAMBU)Pekerja Terampil0.1000oh45,000.004,500.00Mandor0.0250oh85,000.002,125.00Bambu5.0000bh13,000.0065,000.0076Terpal plastik1.1000m37,000.007,700.0025.3333333333Paku0.2000kg18,000.003,600.00Jumlah82,925.00Jasa 10%8,292.50Jumlah Total91,217.50lihat buku analisa pengairanC 021 M3 BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALATPekerja1.3600oh40,000.0054,400.00Mandor0.0600oh85,000.005,100.00Operator Jack Hammer0.0800oh55,000.004,400.00Jack Hammer0.2800jam17,857.145,000.00Jumlah68,900.00Jasa 10%6,890.00Jumlah Total75,790.00S 081 M2 PASANGAN CERUCUK DOLKENDolken dia. 7-10 cm4.5000btg12,000.0054,000.00Pekerja0.1000oh40,000.004,000.00Mandor0.0100oh85,000.00850.00Jumlah58,850.00Jasa 10%5,885.00Jumlah Total64,735.00D 211 M3 PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALATPekerja0.2150oh40,000.008,600.00Mandor0.0690oh85,000.005,865.00Operator Tamper0.0430jam55,000.002,365.00Temper Vibr Plate0.3012jam38,000.0011,445.60Jumlah28,275.60Jasa 10%2,827.56Jumlah Total31,103.16D 221 M3 URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALATPasir urug1.2000m3147,000.00176,400.00Pekerja0.3000oh40,000.0012,000.00Mandor0.0600oh85,000.005,100.00Operator Tamper0.0430jam55,000.002,365.00Temper Vibr Plate0.3012jam38,000.0011,445.60Jumlah207,310.60Jasa 10%20,731.06Jumlah Total228,041.66D 231 M3 PEKERJAAN URUGAN SIRTU UNTUK PONDASISirtu Pecah Tersaring1.1000m3158,000.00173,800.00Pekerja0.5000oh40,000.0020,000.00Pekerja Terampil0.4000oh45,000.0018,000.00Mandor0.0200oh85,000.001,700.00Jumlah213,500.00Jasa 10%21,350.0021.79Jumlah Total234,850.000.0459E 011 M3 PEKERJAAN PONDASI BATAKO AD. 1 : 4Pasir Pasang0.2790m3189,000.0052,731.00Semen Portland2.1700zak61,000.00132,370.00Batako PSPM130.0000bh2,415.00313,950.00Pekerja4.5000oh40,000.00180,000.00Tukang Batu Terampil1.5000oh50,000.0075,000.00Kepala Tukang1.1500oh55,000.0063,250.00Mandor0.2250oh85,000.0019,125.00Jumlah836,426.00Jasa 10%83,642.60Jumlah Total920,068.60S 101 BH PEKERJAAN ANYAMAN BRONJONG TB. 3 MM UK. 1 M3Kawat Bronjong8.3340kg15,000.00125,010.00Pekerja0.5760oh40,000.0023,040.00Pekerja Terampil0.7040oh45,000.0031,680.00Mandor0.0260oh85,000.002,210.00Jumlah181,940.00Jasa 10%18,194.00Jumlah Total200,134.00DIHIT1 M3 PEKERJAAN PASANGAN BRONJONGBronjong Kawat1.0000bh181,940.00181,940.00Batu Bronjol 10 - 15 cm1.1000m3131,000.00144,100.00Pekerja Terampil1.3820oh45,000.0062,190.00Mandor0.0240oh85,000.002,040.00Jumlah390,270.00Jasa 10%39,027.00Jumlah Total429,297.00Dibulatkan429,297.00Asumsi :Waktu memuat = 4 menitKap. produksi / jam =1.245m3Waktu mengaduk = 2 menitKoef. alat / m3 =0.803jamWaktu tuang = 2 menit3.1130.32135Waktu tunggu, dll = 2 menit30 m3/jam3.50mntS 091 M2 PASANGAN SULINGANPipa PVC dia. 2"0.2500btg41,580.0010,395.00Ijuk0.2500ikat25,000.006,250.00Pekerja0.0238oh40,000.00952.38Jumlah17,597.38Jasa 10%1,759.74Jumlah Total19,357.12S 111 M PASANGAN RAILING PIPA GALVANIS (2 BARIS)2015Pipa Galvanis dia. 3"0.3333btg535,185.00178,395.000.050.0666666667Pekerja0.0670oh40,000.002,680.00Kepala Tukang0.0067oh55,000.00368.50Jumlah181,443.50Jasa 10%18,144.35Jumlah Total199,587.85Q 151 BH PASANGAN CANSTEEN UK. 20.30.60 BERIKUT PLESTERAN + ACIAN NATJumlah173,892.40Cansteen1.0000bh7,000.007,000.00Dibulatkan173,890.00Plesteran + Acian0.0400m241,003.601,640.1450.4Alat bantu0.3300set75,000.0024,750.000.0119047619Pekerja0.0360oh40,000.001,440.00Tukang Batu Terampil0.0120oh50,000.00600.00Kepala Tukang0.0060oh55,000.00330.00Mandor0.0012oh85,000.00102.00Jumlah35,862.14Jasa 10%3,586.21Jumlah Total39,448.36E 058 M PEKERJAAN STOOTWERKDolken kayu dia. 7-10 cm7.0000btg12,000.0084,000.00Papan Kruing 2 x 20 x 4m3.0000lbr92,800.00278,400.00Baud7.0000bh8,610.0060,270.000.016Batang Kelapa1.0000btg128,700.00128,700.0062.5Pekerja1.4000oh40,000.0056,000.005800000Kepala Tukang0.4200oh55,000.0023,100.0092800Tukang Kayu4.2000oh50,000.00210,000.00Mandor Lapangan0.7000oh85,000.0059,500.00Jumlah per m'112,496.25Jasa 10%11,249.63Jumlah Total123,745.88I 081 M2 PASANG TRIPLEKS TEBAL 3 MMTripleks tb. 3 mm0.4000lbr47,000.0018,800.00Paku biasa 1/2" - 1"0.0500kg18,000.00900.00Pekerja0.0250oh40,000.001,000.00Tukang Kayu0.0750oh50,000.003,750.00Kepala Tukang0.0075oh55,000.00412.50Mandor0.0013oh85,000.00110.50Jumlah24,973.00Jasa 10%2,497.30Jumlah Total27,470.30DIHIT1 M3 RANGKA KAYUKayu Balok Borneo1.0000m32,100,000.002,100,000.00Paku0.1500kg18,000.002,700.00Pekerja Terampil1.0000oh45,000.0045,000.00Tukang Kayu Terampil1.0000oh50,000.0050,000.00Kepala Tukang0.5000oh55,000.0027,500.00Mandor0.0250oh85,000.002,125.00Jumlah2,227,325.00Jasa 10%222,732.50Jumlah Total2,450,057.50I 061 M2 PASANG DINDING TRIPLEKS & RANGKA KAYU BALOK BORNEOKayu Balok Borneo0.0195m32,100,000.0040,950.00Kayu Papan Borneo0.0070m32,205,000.0015,435.00Paku biasa 2" - 5"0.1000kg18,000.001,800.00Lem kayu0.2800ltr47,000.0013,160.00Triplek 4' x 8' x 4 mm0.5000lbr63,000.0031,500.00Pekerja0.1750oh40,000.007,000.00Tukang Kayu Terampil0.5250oh50,000.0026,250.00Kepala Tukang0.0525oh55,000.002,887.50Mandor0.0100oh85,000.00850.00Jumlah139,832.50Jasa 10%13,983.25Jumlah Total153,815.75H 151 M' PASANG BUBUNG SENG STEEL GELOMBANGSeng gelombang BJLS 300.5556lbr74,000.0041,111.11Paku sekrup 3,5"6.0000bh2,153.0012,918.00Pekerja0.0840oh40,000.003,360.00Tukang Kayu Trampil0.1250oh50,000.006,250.00Kepala Tukang0.0130oh55,000.00715.00Mandor0.0040oh85,000.00340.00Jumlah64,694.11Jasa 10%6,469.41Jumlah Total71,163.52N 111 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESIMeni besi0.1000kg24,000.002,400.00Pekerja0.0200oh40,000.00800.00Tukang Cat Terampil0.2000oh50,000.0010,000.00Kepala Tukang0.0200oh55,000.001,100.00Mandor0.0100oh85,000.00850.00Jumlah15,150.00Keuntungan max. 10%1,515.00Jumlah Total16,665.00DIHIT1 M2 PENGECATAN TEMBOK LAMACat Dasar0.1200kg10,556.721,266.81Cat Penutup0.1800kg10,556.721,900.21Pekerja0.0280oh40,000.001,120.00Tukang Cat0.0420oh45,000.001,890.00Kepala Tukang0.0042oh55,000.00231.00Mandor0.0025oh85,000.00212.5020,516.001 galon = 25 kgJumlah6,620.5210,556.72Jasa 10%662.05Jumlah Total7,282.57Diambil dari K.10.45.5N 121 M2 PENGECATAN PERMUKAAN BAJA GALVANIZECat Besi Duco (Dasar)0.1100kg89,000.009,790.00Cat Besi Duco (Penutup)0.0800kg89,000.007,120.00Pekerja0.0060oh40,000.00240.00Tukang Cat0.0600oh45,000.002,700.00Kepala Tukang0.0120oh55,000.00660.00Mandor0.0060oh85,000.00510.002,970,000.00Jumlah21,020.00Jasa 10%2,102.00Jumlah Total23,122.0020,174.66Q 13PLASTIK BOND BREAKER70000Plastik1.0000m21,800.001,800.00Ongkos Pasang1.0000ls900.00900.00900Jumlah2,700.00Jasa 10%270.00Jumlah Total2,970.0020,174.66Q 141 M1 JOINT CUTTER & JOINT SEALENT71,428.57Cutter Concrete0.0500Jam/m44,714.292,235.711200Sealent0.1429kg32,000.004,572.8019,744,815.09PEKERJA TERAMPIL0.0080Oh45,000.00360.00PEKERJA0.0067Oh40,000.00268.00Mandor0.0085Oh85,000.00722.50Jumlah8,159.01Jasa 10%815.90Jumlah Total8,974.9220,174.66S 12PELUMURAN BESI DOWEL DENGAN OLIOli (Drum)0.0500Liter24,500.001,225.00Pekerja0.0100oh40,000.00400.00Tukang Cat Terampil0.0100oh50,000.00500.00Mandor0.0062oh85,000.00522.841,163.80Alat Bantu0.0050set75,000.00375.00Jumlah3,022.84Keuntungan max. 10%302.287500Jumlah Total3,325.13S 131 BUAH PASANG PVC 1" untuk DOWELPVC AW 1 "0.1200batang27,300.003,276.000.5Ongkos Pasang1.0000ls642.86642.86642.8571428571Jumlah3,918.86Jasa 10%391.8914000Jumlah Total4,310.7420,174.66S 141 BUAH PASANG DOP PVC 1" untuk DOWELDop PVC AW 1 "1.0000Buah3,000.003,000.0090Ongkos Pasang1.0000ls90.0090.00Jumlah3,090.0010,850.00Jasa 10%309.00Jumlah Total3,399.0020,174.66S 151 M PASANG PVC 4"Dop PVC AW 4 "0.2500Buah83,055.0020,763.75900Ongkos Pasang1.0000ls900.00900.00Jumlah21,663.75Jasa 10%2,166.38Jumlah Total23,830.1320,174.66DIHIT1 M2 FINISHING GRID RIGID PAVEMENT / TROWEL BERGARISBuruh Lapangan Terlatih0.0090Oh45,000.00405.00Buruh Lapangan Tak Terlatih0.0113Oh35,000.00393.75Mandor0.0176Oh80,000.001,411.59Alat Bantu0.0200set75,000.001,500.00Jumlah3,710.34Jasa 10%371.03Jumlah Total4,081.3720,174.66DIHIT1 M2 CURING BETONBuruh Lapangan Tak Terlatih0.0200Oh35,000.00700.0045000Mandor0.0036Oh80,000.00288.85Alat Bantu0.0250set75,000.001,875.00Jumlah2,863.85Jasa 10%286.39Jumlah Total3,150.2420,174.66DIHIT1 M2 MARKA JALAN THERMOPLASTIKCat Marka1.9500kg75,900.00148,005.00Thinner1.0500liter18,100.0019,005.00Blass Bit0.4500kg40,000.0018,000.00Compressor0.0750jam75,900.005,692.50Dump Truck0.0750jam158,100.0011,857.50Alat Bantu Lainnya0.1100Ls75,000.008,250.00Pekerja Biasa0.0750oh45,000.003,375.00Tukang0.0281oh35,000.00984.38Mandor0.0094oh80,000.00750.00Jumlah215,919.38Jasa 10%21,591.94Jumlah Total237,511.3120,174.66S 161 M1 PASANG BESI SIKU 5 CMBesi Siku 3 x 50 x 50 mm0.1667m195,000.0015,833.334000Ongkos Pasang1.0000Ls4,000.004,000.00Jumlah19,833.33Jasa 10%1,983.33Jumlah Total21,816.6720,174.66B 01MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK JAUH/RITAlat Berat Trailer Towed15.00Jam438,000.006,570,000.005 KENDARAAN X LAMA PERJALAN/JAMSopir Truck5.00HO50,000.00250,000.00Solar150.00liter4,500.00675,000.00Bensin Tidak Full sehariJumlah7,495,000.00Jasa 10%749,500.00Jumlah Total8,244,500.0020,174.66B 02MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK SEDANG/RITAlat Berat Trailer Towed12.50Jam438,000.005,475,000.005 ALAT BERAT X LAMA PERJALAN/JAMSopir Truck5.00HO50,000.00250,000.00Solar125.00liter4,500.00562,500.00Bensin Tidak Full sehariJumlah6,287,500.00Jasa 10%628,750.00Jumlah Total6,916,250.0020,174.66KOTA DEPOKB 03MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK DEKAT/RITAlat Berat Trailer Towed7.50Jam438,000.003,285,000.005 ALAT BERAT X LAMA PERJALAN/JAMSopir Truck5.00HO50,000.00250,000.00Solar100.00liter4,500.00450,000.00Bensin Tidak Full sehariJumlah3,985,000.00Jasa 10%398,500.00Jumlah Total4,383,500.0020,174.66NIP. 480 115 2077,389,642.86300B 04MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK JAUH / M3 (> 3 km)1,231,607.14Dump Truck 3.5 T0.13Jam163,000.0020,375.003 Mobil X 7 Jam (1 Hari) 1000 m3 Beton1 rit = 0.5jam = 4 m3= 1 lt pp. 6km)Sopir Truck0.