Post on 07-May-2023
08- 2016
HAZOP
) SCIS (
" latifachaimaa@yahoo.com
benh_moh2000@yahoo.fr
(SCIS)
. :
. Abstract: The production process is an essential activity at the industrial institutions which are fraught with a host of risks are difficult to predict and that may be the cause of their failure or the decrease of their performance, for this reasonthe production management has become obliged to manage this risks with clear andscientificmethodologywhich can be capable to detect the productive risks linked with
resources, personnel, occupational health and safety or the environment .the good understanding of this risks oblige the institution to know all the means and techniques which can help her to manage it, so like the”hazop”. in this research paper we have tried to applicate this technique to the level of cement company (SCIS) at saida as an industrial institutionalso the production of cement is fraught with many risks wich can not be detected easily .this risks threaten theSafety andthe occupational Health, this study sought to monitoring all productive risks potential in the company's factory and trying to search for appropriate ways to control it or reduce their severity. Key words: the production process, productivity risks, hazop technique.
224
08- 2016
.
: :
.
)HAZOP( .
)HAZOP( .
.
.
:
1- 1:
2- :
2:
.
. .
.
1 . :
- .
- : .
o :
: o :
.
01:(
) 01.(
.
226
08- 2016
:Hazard and Operability Analysis (HAZOP)
1- )HAZOP (: - .
4 .HAZOP
"")Guide Words(
.5 - HAZOP
HAZOP6
- HAZOP : )
" " HAZOP
.7 2 - HAZOP:
HAZOP1963ICI ( )
" ") (8
. “critical examination”
) (. 9
1964
228
08- 2016
.HAZOP
.10 1970
.
) Line by line
HAZOP (
reliability
Measurable frequency
3 .HAZOP:
) 05 :(
229
08- 2016
:
RiskManagement Training Guides Guide Words(
:
11 . 1
HAZOP
. ) 01 :(
(No)
(Less)
(More)
(Part Of )
(As Well As)
(Reverse)
(Other Than
Dr. Asit K Patra, Asstt, Director, DMI, Bhopal-
General Overview of HAZOP : MethodCompiled ,p 03
: : :
1 - :
82/324 30/10/1982 (ERCO) (GIC)
.28 -12 -1997 (ERCO) (Filiale)
(SCIS)
10.50.000.000. 12
9001 2000 2004
14001 –-
. 2-
CPJ42.5 CEMAA ,CEB .
500000 1700. 380.
3 - :
:
: ) 06 :(
Bendib Abdelhamid, historique du ciment et situation de la production du ciment en Algérie de 1962 à2005,groupe
ERCE, p08
::
1400
230
08- 2016
.
: 1-
. 2-
(
. 3- ZOPHA
. 4-
. 5- ZOPHA
. 6- ZOPHA
. 7-
HAZOP .
8-
.
)HAZOP (.
1:
:18 -22. 2004 04
2 - -
( ) 2007
13 3
01 . 4Dr. Asit K Patra, Asstt. Director, DMI, BhopalGeneral Overview of HAZOP Method.p 01 5Manufacturing Technology Committee – Risk Management Working Group Risk Management Training Guides,p 01. 6http://acutech-consulting.com/acusafe/Hazard_Analysis/HAZOP_Technique.pdf 7William Bridges Selection of Hazard Evaluation Techniques.p02 8Marvin Rausand,hazop”hazard and operability stady,Department of Production and Quality EngineeringNorwegian University of Science and Technology,October 7,2005.p06. 9Gordon Mckay phd,dsd ,Process safety management and risk hazard analysis,p 11.
10 11RISK-BASED DECISION-MAKINGGUIDELINESVolume 3Procedures for Assessing RisksApplying Risk Assessment ToolsChapter 10 — Hazard andOperability (HAZOP) Analysis,p 20.
12 .
235