syamsul irham, Pengelolaan Lapangan, Introduction 1

KEGIATAN SEKTOR MIGAS

UPSTREAM ACTIVITIES

1. Exploration

2. Exploitation

DOWNSTREAM ACTIVITIES

1. Processing

2. Transportation

3. Storage

4. Trading

III: Oil Refining

http://science.howstuffworks.com/oil-drilling1.htm

syamsul irham, Pengelolaan Lapangan, Introduction 2

Development & Production Scenario

Economic Limit

WMP-008 (B1)WMP-008 (B1)WMP-004 STWMP-004 ST

WMP-002 STWMP-002 ST

WMP-007 (A1)WMP-007 (A1)

HP ; MP ; LP SEPARATOR

PRODHEADER

HP WELLS

GAS SALES

MP GAS TO SP-TIKA

HP ; MP ; LP SEPARATOR

PRODHEADER

HP WELLS

GAS SALES

MP GAS TO SP-TIKA

CONVENTIONAL COMPL.SINGLE L STRING

MULTILAYER COMPL.SINGLE STRING

MULTILAYER COMPL.DUAL STRING

Economic Analysis

YES / NO / MAY BE LATER

PENEMUAN PENEMUAN HYDROCARBONHYDROCARBON

KEGIATAN HULU MIGAS

• Kegiatan yg dinamis & penuh risiko

• Pengusahaan padat modal & teknologi

• Setiap kegiatan harus memenuhi kriteria : dapat dilakukan, aman, legal, dan menguntungkan.

syamsul irham, Pengelolaan Lapangan, Introduction 3

Oil and Gas Field Life Cycle

Prospect Definition

Discovery

Appraisal

Development Planning

DevelopmentProduction

Ongoing Development

Depletion

Abandonment

PENGELOLAAN LAPANGAN (FIELD PENGELOLAAN LAPANGAN (FIELD MANAGEMENT):MANAGEMENT):

Membuat suatu perencanaan Membuat suatu perencanaan pengembangan lapangan migas, pengembangan lapangan migas, termasuk penyelenggaraan data, termasuk penyelenggaraan data, rencana kerja yang terkait, anggaran, rencana kerja yang terkait, anggaran, rencana operasi sampai dengan rencana operasi sampai dengan keekonomian . keekonomian .

POD/POFDPOD/POFD

Ref: Kursus pelatihan POD TM-ITB 2003 & “Integrated Petroleum Reservoir Management”, A.Sater & Ganesh C.Thakur

Ref: Kursus pelatihan POD TM-ITB 2003 & “Integrated Petroleum Reservoir Management”, A.Sater & Ganesh C.Thakur

GEOPHYSICS

GEOLOGY

RESERVOIR EVALUATION

PRODUCTION/PROCESSING

ECONOMICS

MANAGEMENT

MAPS, IN PLACE HYDROCARBON

RATE & CHARAC. OF PROD., RESERVE

LIQUID & GAS PROD., COST OF INVESTMENT,

OP.COST

MEASURES OF PROFIT, REPORT

SUMMARY

YES / NO / MAY BE LATER

POD/POFDPOD/POFD

Management

Reservoir Management

Team

Production and Operation Engineering

Drilling Engineering

Design & Construction Engineering

Science

Reseach & Development

Gas & Chemical Engineering

Environtment

Reservoir Engineering

Economics

Geology and Geophysics

Legal

Land

Reservoir Management Team (Copyright@ 1992, SPE, From Paper 22350)

POD/POFDPOD/POFD

Ref: “Integrated Petroleum Reservoir Management”, Satter.A, Ganesh.T

Reservoir Management : as the judicious use of Reservoir Management : as the judicious use of various means available to a businessmanvarious means available to a businessmanIn order to In order to maximize his benefits (profits)maximize his benefits (profits) from a from a reservoir. reservoir.

POD/POFDPOD/POFD

syamsul irham, Pengelolaan Lapangan, Introduction 8

PENGELOLAAN LAPANGAN MIGAS

Pengelolaan usaha-usahaMenemukan dan Memproduksi cadangan migas secara optimal, dengan Teknologi dan Sumber Daya Manusia yang tersedia, memperhatikan aspek Ekonomi, HSE & Community development, dan Peraturan / Perundang-undangan yang berlaku, sehingga Menguntungkan bagi Rakyat, Pengusaha dan Negara.

Basic Pengetahuan Yg Harus Dimiliki

Konsep Nilai Waktu dari Uang, Interest, Discount Factor

Cash Flow Kriteria /Parameter /Indikator Keuntungan

POT NPV @ i PIR /DPIR IRR

Depresiasi Kapital Straight Line Decline Balance Sum of the Year Digits

syamsul irham, Pengelolaan Lapangan, Introduction 9

YOUR GOAL ?????

syamsul irham, Pengelolaan Lapangan, Introduction 10

Your Goal ???They give you long-term vision and short-

term motivation.

An athlete always focus to be the fastest, the first who cross the finish line to be the winner

Business people have set their goals to earn much rewards for their companies.

Set and Reach The Goals

syamsul irham, Pengelolaan Lapangan, Introduction 17

TUGAS-1 : Kondisi Terkini Industri Migas Nasional1. Dibuat /orang 2. Akses dari berbagai sumber yang yang tersedia.3. Eksplorasi, Cadangan, Produksi, Cost, Oil Price,

Gas Price, Kontrak Bagi Hasil, Teknologi, Human Resources, HSE case, dll.

4. Buat komentar pribadi saudara terhadap point-3. FORMAT : SOFT COPY, MICROSOT POWER POINT.

5. DISERAHKAN PALING LAMBAT JUMAT 04 Maret 2011, JAM 11.00 ke : syamsul_batm@yahoo.com