UNIT - SEHORE (M.P.) 466 445 FIN
-
Upload
khangminh22 -
Category
Documents
-
view
3 -
download
0
Transcript of UNIT - SEHORE (M.P.) 466 445 FIN
UNIT - RupeesSl.
No.
Sub-Head Exp.during
previous year
2020-21
Budget
estimate
current year
2021-22
Revised
estimate
current year
2021-22
Proportionate
allocation up to
the month of
04/2021
w.r.t.RE
Amount spent
during the
month of
04/2021
Proposal
sanctioned/
S.O. placed
(LOA
received)
Progressive
Total
Excess/ (-) Saving
(wrt. proportioate
allocation up to the
month)
1 2 3 4 5 6 7 8 9 10
1 010101-Salaries 68710790 66400000 0 11066670 5282748 0 10596412 470258
2 010102- Wages 9473324 10000000 0 833330 165240 0 165240 668090
3 010103- OTA 0 10000 0 830 0 0 0 830
4 010106- M.T. 411957 1100000 0 91670 0 0 0 91670
5 010111-Dom. Tra. Exp. 798640 2500000 0 208330 0 0 0 208330
6 010112 Trv. Exp. (Foreign) 0 1000000 0 83330 0 0 0 83330
7 010113- Office Exp. 20859160 17200000 0 1433330 247785 0 247785 1185545
8 010116- Publication 145015 150000 0 12500 0 0 0 12500
9 010121- Supp.& Materials 9993909 8500000 0 708330 5345144 0 5345144 -4636814
10 010126- Advt. & Pub. 1173508 3000000 0 250000 0 0 0 250000
11 010127- Minor Works 4516400 6000000 0 500000 0 0 0 2983600
12 010150- Other Charges 3708351 3500000 0 291670 0 0 0 291670
13 019613- OE (Swachhta) 219014 300000 0 25000 0 0 0 25000
120010068 119660000 0 15504990 11040917 0 16354581 1634009
1 180251- Motor Vehicle 0 1500000 0 125000 0 0 0 125000
2 180252- M. & Eqptt. 0 45000000 0 3750000 0 0 0 3750000
3 180253- Major Works 28800000 58900000 0 4908330 0 0 0 4908330
28800000 105400000 0 8783330 0 0 0 8783330
UNIT - Ruppes
Item During
previous year
(2020-21)
During the
Month 04/21
Progressive
up to the
Month
Training 368020 54200 54200
Testing 85078924 1418565 1418565
Farm Misc. 3943559 722900 722900
Any other (Office) 2690503 31564 31564
TOTAL ` 92081006 2227229 2227229
REVENUE RECEIPT
TOTAL
Major Head "4401" - Capital Outlay on Crop Husbandry, 113- Agril. Engg., 18-Green Revolution-Krishonnati Yojna, 02-Sub Mission on
Agril.Mechanization
TOTAL
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE
TRACTOR NAGAR, BUDNI, DISTRICT - SEHORE (M.P.) 466 445
FINANCIAL PROGRESS REPORT
MONTH-April, 2021
Demand No.1, Major Head 2401 -Crop Husbandry, 113- Agril. Engg.,26-Green Revolution-Krishonnati Yojna, 01-Sub-Mission on Agricultural Mechanization
UNIT - Ruppes
Sl.No. Item During previous
year (2018-19)
During the
Month
Progressive
up to the
Month
Remarks
1 Training 3261958 426500 1338846
2 Testing 58159155 7673299 17690869
3 Farm Misc. 4214578 0 1806412
4 Any other (Office) 706770 34956 529732
66342461 8134755 21365859TOTAL `
REVENUE RECEIPT
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE
TRACTOR NAGAR, BUDNI, DISTRICT - SEHORE (M.P.) 466 445
Month- July 2019
for Director
UNIT - RupeesSl.
No.
Sub-Head Exp.during
previous year
2020-21
Budget
estimate
current year
2021-22
Revised
estimate
current year
2021-22
Proportionate
allocation up to
the month of
04/2021
w.r.t.RE
Amount spent
during the
month of
04/2021
Proposal
sanctioned/
S.O. placed
(LOA
received)
Progressive
Total
Excess/ (-) Saving
(wrt. proportioate
allocation up to the
month)
1 2 3 4 5 6 7 8 9 10
1 010101-Salaries 68710790 66400000 0 11066670 5282748 0 10596412 470258
2 010102- Wages 9473324 10000000 0 833330 165240 0 165240 668090
3 010103- OTA 0 10000 0 830 0 0 0 830
4 010106- M.T. 411957 1100000 0 91670 0 0 0 91670
5 010111-Dom. Tra. Exp. 798640 2500000 0 208330 0 0 0 208330
6 010112 Trv. Exp. (Foreign) 0 1000000 0 83330 0 0 0 83330
7 010113- Office Exp. 20859160 17200000 0 1433330 247785 0 247785 1185545
8 010116- Publication 145015 150000 0 12500 0 0 0 12500
9 010121- Supp.& Materials 9993909 8500000 0 708330 5345144 0 5345144 -4636814
10 010126- Advt. & Pub. 1173508 3000000 0 250000 0 0 0 250000
11 010127- Minor Works 4516400 6000000 0 500000 0 0 0 2983600
12 010150- Other Charges 3708351 3500000 0 291670 0 0 0 291670
13 019613- OE (Swachhta) 219014 300000 0 25000 0 0 0 25000
120010068 119660000 0 15504990 11040917 0 16354581 1634009
1 180251- Motor Vehicle 0 1500000 0 125000 0 0 0 125000
2 180252- M. & Eqptt. 0 45000000 0 3750000 0 0 0 3750000
3 180253- Major Works 28800000 58900000 0 4908330 0 0 0 4908330
28800000 105400000 0 8783330 0 0 0 8783330
UNIT - Ruppes
Item During
previous year
(2020-21)
During the
Month 04/21
Progressive
up to the
Month
Training 368020 54200 54200
Testing 85078924 1418565 1418565
Farm Misc. 3943559 722900 722900
Any other (Office) 2690503 31564 31564
TOTAL ` 92081006 2227229 2227229
REVENUE RECEIPT
TOTAL
Major Head "4401" - Capital Outlay on Crop Husbandry, 113- Agril. Engg., 18-Green Revolution-Krishonnati Yojna, 02-Sub Mission on
Agril.Mechanization
TOTAL
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE
TRACTOR NAGAR, BUDNI, DISTRICT - SEHORE (M.P.) 466 445
FINANCIAL PROGRESS REPORT
MONTH-April, 2021
Demand No.1, Major Head 2401 -Crop Husbandry, 113- Agril. Engg.,26-Green Revolution-Krishonnati Yojna, 01-Sub-Mission on Agricultural Mechanization
UNIT - Ruppes
Sl.No. Item During previous
year (2018-19)
During the
Month
Progressive
up to the
Month
Remarks
1 Training 3261958 426500 1338846
2 Testing 58159155 7673299 17690869
3 Farm Misc. 4214578 0 1806412
4 Any other (Office) 706770 34956 529732
66342461 8134755 21365859TOTAL `
REVENUE RECEIPT
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE
TRACTOR NAGAR, BUDNI, DISTRICT - SEHORE (M.P.) 466 445
Month- July 2019
for Director
Sl.
No.
Group Vacant Remarks
1 A 6
2 B 0
3 B (NG) 3
4 C 20
29
-
Sl.
No.
Name of the PostSanctioned
strengthFilled
No. of
Vacant
post
Date of
vacancy
Reason for vacancy occurred Action taken
1 2 3 4 5 6 7 8
1 Director1 0 1
01.04.2021 Vacancy occurred due to retirement on
superannuation of Shri J.J.R. Narware
Recruitment action may be initiated by Ministry.
1
01.08.2016
(Revived vide
Ministry's
letter dated
30.01.2020)
Vacancy occurred due to retirement on
superannuation of Shri H.L. Yadav.
Recruitment action for filling up of the vacancy is
under process in the Ministry. The post has been
revived vide Ministry's letter no. 9-23/2019-
M&T(Admn.) dated 30.01.2020.
1 07.08.2019Vacancy occurred due to repatriation of
Dr. Mukund Narayan (On deputation)
Recruitment action for filling up of the vacancy is
under process in the Ministry.
1 01.10.2019Vacancy occurred due to retirement on
superannuation of Shri R.K. Ram, SAE.
Recruitment action may be initiated by Ministry.
1 01.04.2020Vacancy occurred due to retirement on
superannuation of Shri R.M Tiwari, SAE.
Recruitment action may be initiated by Ministry.
3 Agronomist 1 1 0 -- -- --
4 Senior
Instrumentation
Engineer
1 1 0
-- -- --
5 Assistant Director
(Official Language) 1 1 0
-- -- --
6 Test Engineer 1 1 0 -- -- --
7 Instrumentation
Engineer Gr.II 3 2 1
18.01.2017
(Revived vide
Ministry's
letter dated
30.01.2020)
Vacancy occurred due to promotion of
regular incumbent (Shri R.P. Pandey)
Offer letter has already been issued by the Ministry
to the candidate, but the candidate has not joined.
8 Agricultural
Engineer6 7* 0 -- --
*Including one additional post of AE as per
Ministry's letter No. 14-1/2019-M&T(Admn.)
(O/ONo.1/2020) transferred from SRFMT&TI,
Anantapur to CFMT&TI, Budni.9 Agricultural
Engineer
(Instrumentation)
1 1 0 -- -- --
10 Assistant Library
and Information
Officer
1 1 0 -- -- --
11 Administrative
Officer1 1 0 -- -- --
12 Senior Technical
Assistant13 12 1 01.10.2020
Vacancy occurred due to retirement on
superannuation of Shri Ramvishwas
Recruitment action has already been completed
and the DSC Proceeding alongwith documents have
been sent to the Ministry for necessary action.
13 Senior Technical
Assistant
(Instrumentation)
2 2 0 -- -- --
14 Stenographer
Grade-I3 2 1 08.03.2019
Vacancy occurred due to promotion of
Shri Vijay Yadav to the post of
Administrative Officer by Ministry.
As per Ministry's letter no. 12-6/2019-
M&T(Admn.) dated 12.04.2021 the post is to be re-
advertised for deputation including short term
contract.15 Office Supdt.
2 1 1
01.11.2014
& Revived on
09.01.2019
Vacancy occurred due to retirement on
superannuation of the regular held
incumbent.
Recruitment action for filling up of the vacancy on
promotion basis is in under process.
16 Technical Assistant
6 5 1 20.04.2021
Vacancy occurred due to promotion of
regular held incumbent (Smt. Bindu
Rahangdale) to the post of STA
Recruitment action may be initiated by Ministry.
17 Agricultural
Assistant1 1 0 -- -- --
18 UDC 5 5 0 -- -- --
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE, BUDNI (M.P.)
STAFF POSITION for the Month of April, 2021 (As on 30.04.2021)
Sanctioned
strength
Filled
14 8 * 10 Nos. Newly Created posts vide Ministry's letter No. 1-
9/2009-M&T (Admn) dated 06.05.2016.
*01 No. Newly Created post of STA vide Ministry's letter No. 12-
12/2015-M&T(Admn) dated 01.05.2019.
9 10*
20 17
92 72
TOTAL* 135 107
* MTS (Technical) 4 4
*Note: One post of UDC and Stenographer Gr.II each were abolished by the Ministry vide letter no. 12-6/2015-M&T(Admn) dated 24.08.2018.
VACANCY POSITION
GROUP ‘A’ (GAZETTED)
2 Sr. Agricultural
Engineer
6 2
GROUP ‘B’ (GAZETTED)
GROUP ‘B’ (NG)
GROOUP 'C'
Page 1 of 2
19 Compounder
1 0 1 30.06.2018
Vacancy occurred due to selection of
regular incumbent to another department.
As per Ministry's letter no. 12-1/2016-
M&T(Admn.) dated 24.02.2020 the post is to be
filled up by the Anantapur Institute.20 Senior Technician
24 23 1 30.01.2021
Vacancy occurred due to promotion of
regular held incumbent (Shri Liban Lakda)
into higher post of Technical Assistant and
Transfer to Assam Institute.
Recruitment action may be initiated by Ministry.
1
04.11.2013 &
Revived on
09.01.2019
Vacancy occurred due to promotion of
Shri Sunil Kumar Choudhary to higher
post.
Offer to selected SSC candidate was issued by
Ministry, but the incumbent had not joined the
post. Hence, the offer of appointment has been
cancelled by the Ministry. The post has been
revived vide Ministry's letter no. 9-69/2018-
M&T(Admn.) dated 09.01.2019. However, a person
is engaged on contract basis.
1
01.04.2016
& Revived on
09.01.2019
Vacancy occurred due to transfer on
promotion of Shri S.L. Dhurve at Hisar
Institute,
Recruitment action may be initiated by the
Ministry. However, a person is engaged on contract
basis. The post has been revived vide Ministry's
letter no. 9-69/2018-M&T(Admn.) dated
09.01.2019.
1
04.11.2016
(Revived vide
Ministry's
letter dated
30.01.2020)
Vacancy occurred due to promotion of
regular held incumbent (Shri O.N. Arya).
Recruitment action may be initiated by the
Ministry. However, a person is engaged on contract
basis. The post has been revived vide Ministry's
letter no. 9-23/2019-M&T(Admn.) dated
30.01.2020.
1
07.11.2016
(Revived vide
Ministry's
letter dated
30.01.2020)
Vacancy occurred due to promotion of
regular held incumbent (Smt. Madhuri
Sharma).
Recruitment action may be initiated by the
Ministry. However, a person is engaged on contract
basis. The post has been revived vide Ministry's
letter no. 9-23/2019-M&T(Admn.) dated
30.01.2020.
1 01.02.2019
Vacancy occurred due to retirement on
superannuation of Shri Ashok L.
Barapatre.
Recruitment action may be initiated by Ministry.
1 24.02.2021
Vacancy occurred due to selection on
higher post of regular incumbent i.e. Shri
Sunil Kumar Pradhan on the post of LIA
and posted to NERFMT&TI, Assam.
Recruitment action may be initiated by Ministry.
22 Technician 6 6 0 -- -- --
2
31.01.2017
(Revived vide
Ministry's
letter dated
30.01.2020)
Vacancy occurred due to selection on
higher post of regular incumbent.
(Sanodiya, Baraskar).
Recruitment action may be initiated by the
Ministry. However, the work is managed by
persons engaged on contractual basis. The post has
been revived vide Ministry's letter no. 9-23/2019-
M&T(Admn.) dated 30.01.2020.
1 18.06.2019
Vacancy occurred due to selection on
higher post of regular incumbent. (Shri
Govind Vishwakarma).
Recruitment action may be initiated by the
Ministry.
1 01.10.2019
Vacancy occurred due to selection on
higher post of regular incumbent. (Shri
Arvind Kumar Ode).
Recruitment action may be initiated by the
Ministry.
1 25.07.2020
Vacancy occurred due to selection on
higher post of regular incumbent. (Shri
Praveen Dhote.
Recruitment action may be initiated by the
Ministry.
1 06.08.2020
Vacancy occurred due to selection on
higher post of regular incumbent. (Shri
Vijay.
Recruitment action may be initiated by the
Ministry.
1 01.01.2020
Vacancy occurred due to retirement on
superannuation of Shri Jamuna Prasad
Yadav
Recruitment action may be initiated by the
Ministry.
1 01.01.2020
Vacancy occurred due to retirement on
superannuation of Shri Devkinandan
Dubey.
Recruitment action may be initiated by the
Ministry.
1 01.06.2020
Vacancy occurred due to retirement on
superannuation of Shri Kailash Chandra
Patel.
Recruitment action may be initiated by the
Ministry.
1 01.09.2020Vacancy occurred due to retirement on
superannuation of Shri Madanlal
Recruitment action may be initiated by the
Ministry.
1 05.09.2020
Vacancy occurred due to selection in
another department on higher post of
regular incumbent. (Shri Bittu Kumar)
Recruitment action may be initiated by the
Ministry.
25 MTS (Tech)
outsourced4 4 0 -
- -
21 LDC
Head of Office
3
23 MTS (Tech)
10 4
24 MTS (Non-
Technical)
30 25
9
Page 2 of 2
SI.
No.
Particulars NSQF U T A NB M FN App. *SDPMLA
B
Total
1 Target 3000/3600
2 Previous Month(s) total 0 0 0 0 0 0 0 0 0 0
Trainees trained During
the month
0 63 23 77 0 0 0 0 0 163
Total 0 63 23 77 0 0 0 0 0 163
4
a) General 0 8 10 31 0 0 0 0 0 49
b) SC 0 9 3 4 0 0 0 0 0 16
c) ST 0 2 0 1 0 0 0 0 0 3
d) OBC 0 44 10 41 0 0 0 0 0 95
Total 0 63 23 77 0 0 0 0 0 163
Land less 0 22 10 54 0 0 0 0 0 86Marginal 0 17 7 6 0 0 0 0 0 30Small 0 16 3 10 0 0 0 0 0 29Semi-medium 0 4 0 3 0 0 0 0 0 7Medium 0 2 1 2 0 0 0 0 0 5Large 0 2 2 2 0 0 0 0 0 6Total 0 63 23 77 0 0 0 0 0 163
i) Sponsored 0 0 0 77 0 0 0 0 0 77
ii) Direct admission 0 63 23 0 0 0 0 0 0 86
Total 0 63 23 77 0 0 0 0 0 163
5 No. of women candidates 0 5 0 14 0 0 0 0 0 19
6 Apprentice Under Training
(Graduate / ITI Trade /
Vocational)
7 Over-All Achievement 0 63 23 77 0 0 0 0 0 163
i) Women trained (10% of
total Target)
0 5 0 14 0 0 0 0 0 14/163
(8.59%)ii) Farmers trained (50% of
Total Target)
0 63 0 0 0 0 0 0 0 63/163
(38.65%)
Sl
No.
Particulars III Quarter
(Oct.-Dec.
2020)
IV
Quarter
(Jan-
March.
2021)
1 Target 750 750
2 Achievement
Sr.
No.
Course
1 Need Base (TAFE)
2 SDPMLAB
3 U-5
4 U-12
16
CENTRAL FARM MACHINERY TRAINING AND TESTING INSTITUTE TRACTOR NAGAR, BUDNI
(M.P.)
Monthly Progress Report of Trainees Trained in the Month of APRIL, 2021
(i) Progressive Total of trainees – Category wise
(i) Progressive Total of trainees – Category wise
3000/3600
* SDPMLAB (Skill Devepolment Programme for Migrant Labourers under "Atmanirbhar Bharat".
II Quarter (July-
Sep., 2020)
I Quarter
(Apr.-Jun,
2020)
Senior Agriculture Engineer
Trainees trained Since
inception
72,221
Total during the
year
Applicant did not responded
Remark
Cancelled
Following planned courses during the month could not be conducted due to Covid-19 Pandemic.
750 750
163
Cancelled
Applicant did not responded
State NSQF U T A NB M APP *SDPMLAB Grand Total
Andhra Pradesh 0 0 0 0 0 0 0 0 0
Arunachal Pradesh 0 0 0 0 0 0 0 0 0
Assam 0 0 0 0 0 0 0 0 0
Bihar 0 1 1 2 0 0 0 0 4
Chandigarh 0 0 0 0 0 0 0 0 0
Chhattisgarh 0 0 0 0 0 0 0 0 0
Delhi 0 0 0 0 0 0 0 0 0
Goa 0 0 0 0 0 0 0 0 0
Gujarat 0 0 0 0 0 0 0 0 0
Haryana 0 0 0 0 0 0 0 0 0
Himachal Pradesh 0 0 0 0 0 0 0 0 0
Jammu & Kashmir 0 0 0 0 0 0 0 0 0
Jharkhand 0 0 0 0 0 0 0 0 0
Karnatak 0 0 0 0 0 0 0 0 0
Kerala 0 0 0 0 0 0 0 0 0
Lakshadweep 0 0 0 0 0 0 0 0 0
Madhya Pradesh 0 54 14 75 0 0 0 0 143
Maharashtra 0 1 0 0 0 0 0 0 1
Manipur 0 0 0 0 0 0 0 0 0
Meghalaya 0 0 0 0 0 0 0 0 0
Mizoram 0 0 0 0 0 0 0 0 0
Nagaland 0 0 0 0 0 0 0 0 0
Orissa 0 0 0 0 0 0 0 0 0
Pandicherry 0 0 0 0 0 0 0 0 0
Punjab 0 0 0 0 0 0 0 0 0
Rajasthan 0 0 0 0 0 0 0 0 0
Sikkim 0 0 0 0 0 0 0 0 0
Tamil Nadu 0 0 0 0 0 0 0 0 0
Tripura 0 0 0 0 0 0 0 0 0
Telangana 0 0 0 0 0 0 0 0 0
Uttar Pradesh 0 7 8 0 0 0 0 0 15
Uttarakhand 0 0 0 0 0 0 0 0 0
West Bengal 0 0 0 0 0 0 0 0 0
Foreign Nationals 0 0 0 0 0 0 0 0 0
Grand Total 0 63 23 77 0 0 0 0 163
* SDPMLAB (Skill Devepolment Programme for Migrant Labourers under "Atmanirbhar Bharat".
CENTRAL FARM MACHINERY TRAINING AND TESTING INSTITUTE TRACTOR NAGAR,
BUDNI PROGRESSIVE TOTAL OF STATE-WISE TRAINEES TRAINED APRIL, 2021
Senior Agricultural Engineer
D:\Administration\MPR 2021-22\MPR April 2021\MPR APRIL 2021 Training/Sheet2/2
SC ST OBC Gen 1 Land less 00 ha 86 13 2 35 36
2 Marginal 1ha 30 1 0 25 4
3 Small 1-2 ha 29 2 0 22 5
4 Semi-medium 2-4 ha 7 0 1 5 1
5 Medium 4-10 ha 5 0 0 5 0
6 Large
10 ha.Above
6 0 0 3 3
Total 163 16 3 95 49
2
2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
1 3052 3004 3042 3113 3002 163
Senior Agricultural Engineer
Progressive Total
86
30
29
7
During the
month
Catergories of
Farmers (Land
Categories)
Trainees Trained
During last five years
5
SI.No.
SI. No. Component
Progress report for the month of the APRIL, 2021
CENTRAL FARM MACHINERY TRAINING AND TESTING INSTITUTE, TRACTOR NAGAR,
BUDNI (M.P.)
6
163
During the Year 2021-22
Besides these following information may also be furnished
D:\Administration\MPR 2021-22\MPR April 2021\MPR APRIL 2021 Training/Sheet3/3
Officials Total
1
0 0
Visit of Farmer Group/others at Institute, up-to APRIL, 2021
F. No. 11-6/2020-21 Trg.
Visitors
NIL
Senior Agricultural Engineer
S.
No.
Candidates trainedFarmers from
Total 0
Sr.
No.
Date of
Demonstra
tion
Name of Machines/
Equipments/Tools
Name of Village &
District
State No. of
Machines
No. of
Demo
Progressiv
e Demo
No. of
Benificaries
1
No. of Demonstration No. of Beneficaries
0 0
Demonstration of the Machinery & Equipment at villages, under Technology Transfer Camps (TT)
up-to APRIL , 2021
F. No. 11-6/2020-21 Trg.
Senior Agricultural Engineer
NIL
Page 2 of 9
GOVERMENT OF INDIA
MINISTRY OF AGRICULTURE AND FARMERS WELFARE (DEPARTMENT OF AGRICULTURE, CO-OP. & FARMERS WELFARE,
MECHANIZATION & TECHNLOGY DIVISION)
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE (An ISO: 9001:2015 Certified Institutes)
TRACTOR NAGAR, BUDHNI (M.P.) 466 445
E-mail: [email protected] Web site: http:fmttibudni.gov.in ________________________________________________________________________________________ No.: 20-1/2015- (Test) Dated: Dated:7
thMay, 2021
PROGRESS OF TESTING ACTIVITIES FOR THE MONTH OFAPRIL, 2021 (Initial Commercial, Batch, Variant & OECD Testing)
1. Machines carried forward from the previous Year 54
2. No. of machines taken-up for test during the month 07
3. Progressive total of machines taken-up for testing during the year 07
4. No. Of Draft Test Reports released during the month 06
5. No. Of Final Test Reports released during the month 11
6. Progressive total of Final Test Reports Released during the year 11
7. Draft test reports released, but final test reports yet to be released 08
8. No. of Machines under test (ICT: 12, OECD:06, Variant: 04, Conf.: 03, Batch: 30, Admin. Ext. / Tech. Ext. : 01)
56*
9. Revenue received in this month (Rs.) ICT Test Rs. 9,08,328/- + CMVR- Rs. 2,57,076/- + OECD Test Rs. 79,978/- + Emission Rs. Nil /-
12,45,382/-
10. Ground Rent Received in this month, (Rs) 1800
11. Progressive revenue received during the year (Rs.) ICT Test + CMVR + Emission + OECD + Ground Rent
12,47,182/-
12. Machines/components for which pre-test formalities are completed/yet to be completed:
Tractor(s)
Pre test formality completed 01
Pre test formality yet to be completed (Test sample and /or Test fee not received)
47
13. Machines/components, received for test/ are yet to be received:
Components Received 00
Yet to be received 00
Target for year 2021-22 60 test reports
Achievements
11
Achievements Since Inception: -
Machines Tested
Since Inception (Up to March, 2021)
During Last Five Years Total 2017-18 2018-19 2019-20 2020-21 2021-22
2052 63 90 201 93 11 2063
*Note: In case of Swaraj 960 FE, 2 number of DTR (1 Batch + 1 Tech Ext) have been released in this month for
1 tractor. So, the number of machines under test are 56 and not equals to 55 (54+7-6=55).
(Y. K. RAO)
Senior Agricultural Engineer
Page 3 of 9
I. DRAFT REPORTS RELEASED DURING THE MONTH OF APRIL, 2021
S. No. Make & Model of the Machine Nature of Test Released in the month
1 TAFE, MF 9515 OECD Admin Ext February, 2021 (05.02.21)
2 TAFE, MF 1015 OECD Admin Ext February, 2021 (05.02.21)
3 Mahindra, 415 DI (Brand name - Bhoomiputra)
Batch Test (Incomplete)
April, 2021 (13.04.21)
4 New Holland, 3630 TX Tech Ext April, 2021 (16.04.21)
5 TAFE, MF 241 DI Planetary Plus V1 1st Batch (variant) April, 2021 (16.04.21)
6 TAFE, MF 241 DI 1st Batch April, 2021 (16.04.21)
7 Swaraj, 960 FE Tech Ext April, 2021 (23.04.21)
8 Swaraj, 960 FE Batch Test April, 2021 (23.04.21)
DETAILS OF THE FINAL TEST REPORTS RELEASED DURING THE YEAR 2021-22
(Y. K. RAO)
Senior Agricultural Engineer
S. No.
Make & Model of the Machine Type of test Test Report No. Month of release
1 2 3 4 5
1. Swaraj, 735 FE e R Variant T-1526/2053/2021 April, 2021
2. ACE, ACT 60 Self Propelled Combine Harvester (Track Type)
1st Batch Comb-65/2054/2021 April, 2021
3. Mahindra, 605 DI MS (Brand name –
Arjun Novo)
Batch (Variant) T-1527/2055/2021 April, 2021
4. TAFE, MF 7250 DI E7 Variant T-1528/2056/2021 April, 2021
5 TAFE, MF-1030 Mahashakti 1st Batch T-1529/2057/2021 April, 2021
6 New Holland, 4710A Tech Ext T-1530/2058/2021 April, 2021
7 New Holland, 4710A 1st Batch T-1531/2059/2021 April, 2021
8 New Holland 4010A Tech Ext T-1532/2060/2021 April, 2021
9 New Holland 4010A 1st Batch T-1533/2061/2021 April, 2021
10 Preet, 2549 Agritrac 4WD ICT T-1534/2062/2021 April, 2021
11 Tafe Ltd, MF 241 DI V21 ICT T-1535/2063/2021 April, 2021
Page 4 of 9
STATUS OF TESTING (UNDER TEST) OF DIFFERENT MACHINES AS ON 30.04.2021
S. No.
Name of Machine
Date /month of
completion of the pre-
test formalities
Nature of test
Month of start of
test
Present position of
test
Likely date for release of
draft/ final report
Remarks
1 2 3 4 5 6 7 8
1 Sonalika International, MM 18
02.07.20 ICT 13.07.20 Under final wear assessmentTest
DTR in May,21
DTR allotted AE(R) – 02.04.21 (offline application)
2 Eicher-557 10.07.20 Batch 03.08.20 Breakdown occurred during haulage test
DTR in June,21
DTR allotted AE(V) – 02.04.21(offline application)
Haulage Test held up due to trailer overturning. Informed CR on 19.04.21
3 Eicher-548 23.07.20 Batch 04.08.20 Under haulage test
DTR in June, 21
DTR allotted AE(V) – 02.04.21 (offline application)
4 Escorts Limited, 35 (Brand name –
Farmtrac)
27.07.20 ICT 05.08.20 Waiting for puddlingTest
DTR in June, 21
DTR allotted AE(RP) – 08.02.21. (offline application)
Special Tyresas recommended by the applicant for puddling test was not received from firm. Delay from applicant’s side.
5 Escorts, 22 (Brand name: Farmtrac)
10.08.20 ICT 11.08.20 Waiting for puddlingTest
DTR in June, 21
(offline application) Special Tyres as recommended by the applicant for puddling test was not received from firm. Delay from applicant’s side.
6 TAFE, MF 1035 DI V2 06.10.20 Batch 07.10.20 DTR under preparation
DTR in May, 21
DTR allotted AE(R) – 08.02.21(offline application)
7 ACE, DI 305 NG 08.10.20 Batch 09.10.20 DTR under preparation
DTR in May, 21
DTR allotted AE(R) – 02.04.21(offline application)
8 VST Shakti, MT 171 DI 16.10.20 Conf 02.11.20 Under field Test
DTR in June, 21
(offline application)
9 Preet, 4549 Challenger 23.10.20 Batch 04.11.20 Waiting for final wear
assessment
DTR in
June, 21
DTR allotted AE(RP) – 02.04.21(offline application)
10 Solis 50 4WD 12.10.20 OECD 06.11.20 DTR under preparation
DTR in May, 21 DTR allotted AE(PY) – 08.02.21(offline application)
11 Mahindra 605 DI i 4WD S+
30.10.20 Batch (Variant)
10.11.20 Waiting for final wear
assessment
DTR in June, 21
DTR allotted AE(PY) – 03.05.21(offline application)
12 Captain, 250 DI 09.11.20 Batch 11.11.20 Waiting for final wear
assessment
DTR in
June, 21
28/2020-21/3 Online application DTR allotted AE(RP) – 02.04.21
13 Swaraj, 724 FE 4WD 23.11.20 ICT 04.12.20 Under final wear
measurement
DTR in June, 21
DTR allotted AE(R) – 03.05.21(offline application)
Page 5 of 9
1 2 3 4 5 6 7 8
14 Solis 26 4WD 19.11.20 OECD 07.12.20 DTR under preparation
DTR in May, 21 DTR allotted AE(PY)
– 02.04.21(offline application)
15 TAFE, MF 9500 2WD 23.11.20 Batch 08.12.20 Under drawbar Test
DTR in July, 21 (offline application)
16 International Tractors Ltd, Solis 2516
01.12.20 ICT 09.12.20 DTR under preparation
DTR in May, 21 28/2020-21/9 Online application DTR allotted AE(S) – 02.04.21
17 Mahindra, B 275 DI TU MKM (Brand name – Sarpanch)
28.11.20 Batch (Variant)
11.12.20 DTR under preparation
DTR in May, 21 DTR allotted AE(S) – 02.04.21 (offline application)
18 Mahindra, Yuvo 275 DI 28.11.20 Batch Full 11.12.20 Breakdown occurred during brake test
DTR in July, 21 Camshaft found broken. Test held up. Informed to CR on 09.04.21(offline application)
19 Mahindra,Yuvo 575 DI 01.12.20 Batch 15.12.20 DTR under preparation
DTR in May, 21 DTR allotted AE(RP) – 03.05.21 (offline application)
20 Mahindra,Yuvo 475 DI 01.12.20 Batch 15.12.20 Under PTO
Test (Test held up)
DTR in July, 21 Excessive power observed during pto test. E-mail sent to firm on 11.03.21.offline application
21 Solis WT 75 4WD 01.12.20 OECD 17.12.20 DTR under preparation
DTR in May, 21 DTR allotted AE(PY)
– 02.04.21(offline application)
22 TAFE, MF9500 4WD 04.12.20 Batch 04.01.21 Waiting for drawbar Test
DTR in July, 21 (offline application)
23 KUBOTA, L4508DD 07.12.20 Batch 04.01.21 Waiting for drawbar Test
DTR in July, 21 28/2020-21/16
Online application
24 TAFE, MF5245 DI Planetary Plus V1
04.12.20 Batch 06.01.21 Waiting for drawbar Test
DTR in July, 21 (offline application)
25 New Holland, 3230 07.12.20 Tech Ext 06.01.21 DTR under preparation
DTR in May, 21 DTR allotted AE(V)
– 08.02.21(offline application)
26 John Deere, 5310 V3 08.12.20 Batch 08.01.21 Waiting for drawbar Test
DTR in July, 21 (offline application)
27 Eicher, 380 USJ 17.12.20 Batch (Variant)
11.01.21 DTR under preparation
DTR in May, 21 DTR allotted AE(S) – 03.05.21 (offline application)
28 TAFE, MF 241 DI AT 22.12.20 ICT 13.01.21 Waiting for drawbar Test
DTR in Aug, 21 28/2020-21/12 Online application
29 TAFE, MF 5118 22.12.20 Conf 15.01.21 Waiting for drawbar Test
DTR in Aug, 21 (offline application)
30 Mahindra, JIVO 245 DI 31.12.20 Batch 19.01.21 Waiting for drawbar Test
DTR in Aug, 21 28/2020-21/8 Online application
31 International Tractors Ltd., Solis Worldtrac 90 4WD
21.12.20 OECD 20.01.21 Waiting for drawbar Test
DTR in June,
21
(offline application)
32 TAFE Ltd., MF 5245 DI
4WD
11.01.21 Batch 01.02.21 Under PTO Test
(Test held up)
DTR in Aug, 21 28/2020-21/21.
Online Application. More power observed. Letter sent to firm on
20.04.21.
33 International Tractors Limited, DI-750 III HDM
12.01.20 Batch 01.02.21 Waiting for drawbar Test
DTR in Aug, 21 28/2020-21/17.
Online Application.
34 VST SHAKTI, MT180/JAI-2W
11.01.21 Batch (Variant)
03.02.21 Waiting for drawbar Test
DTR in July, 21 28/2020-21/15.
Online Application.
35 New Holland, 3600-2 A1
25.01.21 Variant 03.02.21 DTR under preparation
DTR in June, 21
28/2020-21/23. Online
Application. DTR allotted AE(V) – 03.05.21
36 KN Farm Equipment Ltd., Kushal 3456
01.02.21 ICT 04.02.21 Under PTO Test
DTR in Aug, 21 28/2020-21/10 Online
Application.
Page 6 of 9
1 2 3 4 5 6 7 8
37 International Tractors Limited, Sonalika International DI-740
Super CM Series
Tech Ext Tractor
available
Batch 08.02.21 Waiting for
hyd. Test
DTR inAug,21 28/2020-
21/13Online Application.
38 International Tractors Ltd., Solis 4515
04.02.21 ICT 08.02.21 Waiting for PTO Test
DTR inAug, 21 28/2020-21/47
Online
Application.
39 KUBOTA, MU5502 05.02.21 Conf 09.02.21 Waiting for drawbar Test
DTR inAug, 21 28/2020-21/32 Online Application.
40 Solis 75 RX 4WD 19.01.21 OECD 23.02.21 Under hydraulic Test
DTR inJuly, 21 Offline
application
41 Swaraj 963 FE ST 4x4 15.02.21 ICT 01.03.21 Waiting for PTO Test
DTR inSept, 21 offline
application
42 International Tractors Ltd., Solis 4215
17.02.21 ICT 01.03.21 Waiting for PTO
Test
DTR inSept,21 28/2020-21/48
Online Application.
43 New Holland, 5510E1 26.02.21 ICT 03.03.21 Waiting for PTO Test
DTR inSept, 21 Online Application.
44 John Deere, 5205 01.03.21 Variant 05.03.21 Waiting for PTO
Test
DTR inJuly, 21 28/2020-21/37
Online Application.
45 Swaraj, 742 FE 02.03.21 Tech Ext + Batch Test
09.03.21 Waiting for PTO Test
DTR inSept,21 28/2020-21/44
&28/2020-21/45
Online Application
46 Solis Worldtrac 105 4WD
01.02.21 OECD 09.03.21 Waiting for PTO Test
DTR in Aug, 21 offline application
47 TAFE Ltd., MF 7250 DI V1.1
05.03.21 Batch 11.03.21 Waiting for PTO Test
DTR in Sept,21 28/2020-21/30
Online Application
48 Escorts Limited, 45 F9 11.03.21 Batch 17.03.21 Waiting for PTO
Test
DTR in Sept,21 28/2020-21/35
Online Application
49 Escorts Limited, 6055 F31 (Brand Name- Farmtrac)
11.03.21 ICT 17.03.21 Waiting for PTO Test
DTR in Sept,21 28/2020-21/46
Online Application
50 Escorts Limited, 439 E1 (Brand Name-
Powertrac)
11.03.21 Batch (Variant)
05.04.21 Under Lab Test DTR in Oct,21 28/2020-21/29
Online Application
51 Escorts Limited, 60 F2 (BRAND NAME-FARMTRAC)
11.03.21 Batch (Variant)
05.04.21 Under Lab Test DTR in Oct,21 28/2020-21/33
Online Application
52 Eicher 188 4WD 19.03.21 Variant 09.04.21 Under Lab Test DTR in Oct,21 offline application
53 John Deere, 5042D V3 22.03.21 Batch
(Variant) 09.04.21 Under Lab Test DTR in Oct,21 offline application
54 John Deere, 5045D V2 22.03.21 Batch
(Variant) 13.04.21 Under Lab Test DTR in Oct,21 offline application
55 Swaraj 742 XT 30.03.21 Variant 13.04.21 Under Lab Test DTR in Oct,21 28/2020-21/66
Online Application
56 Mahindra, 555 DI Power +
06.04.21 Batch 15.04.21 Under Lab Test DTR in Oct,21 28/2020-21/26
Online Application
(Y. K. RAO)
Senior Agricultural Engineer
Page 7 of 9
Tractor/Combine Harvester In-line for testing Initial Commercial Test/Variant/Confidential test as on 30.04.2021
(Machines to be taken under test as per their respective seniority on the basis of completion of all test formalities.)
S.No. Make & Model of Tractor
Type of Test
Application received
date
Date of completion of pre test formalities
Test fee Challan receipt date
Date of receipt of
tractor
Date of receipt of printed
literature
Remarks
1 2 3 4 5 6 7 8 9
1 John Deere, 5036D Batch 20.01.21 Fee paid 19.04.21 - 28/2020-
21/50
Approved.
Tractor/Combine Harvester In-line for Testing
Initial Commercial Test/Variant/ Confidential test as on 30.04.2021
Offline Applications:
S.N
O.
Make & Model of
Machine
Type of
test
Application
received date
Date of
comple-tion
of pre-test
formalities
Test fee
received
date
Date of
receipt
of
tractor
Date of
receipt
of
printed
literatu-
re
Remarks
1 2 3 4 5 6 7 8 9
1 Agrolux 60E 2WD tractor
Variant (Batch)
(Variant of Agromaxx 60 4WD)
22.03.18
(Revised
02.03.20)
- 06.01.20 The applicant has been asked for submission of tractor & clarification for water temp. Letter sent on 29.05.20.
2 Agromaxx 4055E (8+8)
ICT 08.05.19 06.01.20 Letter has been sent to the firm for seeking clarification for considering base & variant models. Letter sent on 15.05.20.
3 Agromaxx 4055E (12+3)
ICT 08.05.19 06.01.20 Letter has been sent to the firm for seeking clarification for considering base & variant models. Letter sent on 15.05.20.
4 Agromaxx 4045E ICT 08.05.19 06.01.20 Letter has been sent to the firm for seeking clarification for considering base & variant models. Letter sent on 15.05.20.
5 Eicher 242 USJ Batch 15.05.19 - 07.09.20 Firm has to submit comparison of specs. Letter sent on dated 04.09.19 & 21.09.20.
6 Agromaxx 4050 E ICT 22.07.19 06.01.20 Letter has been sent to the firm for seeking clarification for considering base & variant models. Letter sent on 15.05.20.
7 Swaraj 855 FE i 4x4
Variant 31.08.20 31.08.20 Letter sent to the firm on 16.09.20 for submission of tractor.
8 International Tractors Ltd., Solis 60
OECD 03.12.20 Letter sent to the firm on dated 12.04.21 for depositing test fee & tractor. The applicant yet to be submitted test sample / schedule plan for random selection.
Page 8 of 9
1 2 3 4 5 6 7 8 9
9 TAFE, 7515 4WD OECD 12.02.21 29-04.21 Letter sent to the firm on dated 12.04.21 for depositing test fee & tractor. The applicant yet to be submitted test sample / schedule plan for random selection.
10 TAFE, 8515 4WD OECD 12.02.21 29-04.21 Letter sent to the firm on dated 12.04.21 for depositing test fee & tractor. The applicant yet to be submitted test sample / schedule plan for random selection.
Online Applications:
1 2 3 4 5 6 7 8 9 11 VST SHAKTI, MT 270
VIRAAT 4W
Batch 22.12.20 28/2020-21/31
Approved.
12 Eicher, 368 USJ
Batch 29.12.20 Fee paid 28/2020-21/38
Approved.
13 Eicher, 551 Batch 29.12.20 Fee paid 28/2020-21/39
Approved.
14 Eicher, 650 Variant 07.01.21 Fee paid 28/2020-21/43
Approved.
15 Escorts Limited, Farmtrac 60
Tech Ext 03.02.21 Fee paid 28/2020-21/54
Approved.
16 Escorts Limited, Farmtrac 6050 F1 UM
Tech Ext 09.02.21 Fee paid 28/2020-21/55
Approved.
17 Escorts Limited, Farmtrac 6050 F1 UM
Batch 09.02.21 Fee paid 28/2020-21/56
Approved.
18 Swaraj, CODE Self Propelled Multipurpose Tool Bar
Conf 16.02.21 28/2020-21/60
Under Scrutiny
19 TAFE, MF 1035 DI M8 Variant 02.03.21 28/2020-21/61
Approved.
20 Eicher, 485 USJ Batch 04.03.21 Fee paid 28/2020-21/62
Approved.
21 Captain, 200 DI Batch 05.03.21 28/2020-21/63
Under Scrutiny
22 International Tractors Limited, Sonalika International DI-26 Gardentrac
Tech Ext 05.03.21 28/2020-21/64
Under Scrutiny
23 Mahindra, Novo 605 DI
ICT 09.03.21 Fee paid 28/2020-21/67
Approved.
24 Mahindra, Novo 655 DI PP 4WD
ICT 09.03.21 Fee paid 28/2020-21/68
Approved.
25 International Tractors Limited, DI-35 HDM (Brand Name : RX)
Batch 10.02.21 28/2020-21/69
Under Scrutiny
26 International Tractors Limited, Sonalika
International DI-30 Baagban Super
Tech Ext 07.03.21 28/2020-21/70
Under Scrutiny
27 Escorts Limited, Euro 50
Tech Ext 11.03.21 28/2020-21/71
Approved.
28 Escorts Limited, Euro 50
Batch 11.03.21 28/2020-21/72
Approved.
29 International Tractors Limited, Sonalika International Di-30 Rx Baagban Super 4WD
Batch 11.03.21 28/2020-21/73
Under Scrutiny
30 Mahindra, Arjun 605 DI i
ICT 12.03.21 Fee paid 28/2020-21/74
Approved.
31 International Tractors Limited, DI-47 RX 4WD
Batch 16.03.21 28/2020-21/75
Approved
Page 9 of 9
1 2 3 4 5 6 7 8 9
32 TAFE, MF 1134 Tech Ext 17.03.21 28/2020-21/76
Under Scrutiny
33 International Tractors Limited, Sonalika International DI-35 RX CM Plus
Batch 19.03.21 28/2020-21/77
Under Scrutiny
34 ACE, DI 42 XT Batch (Variant)
20.03.21 28/2020-21/78
Approved.
35 John Deere, 5310 V1 Batch (Variant)
23.03.21 28/2020-21/79
Approved
36 John Deere, 5310 V4 Batch (Variant)
23.03.21 28/2020-21/80
Approved
37 Preet Tractors Pvt. Ltd, 7549 Agritrac 4WD
Batch 24.03.21 28/2020-21/82
Under Scrutiny
38 Escorts Limited, Euro 41 E3
Batch 25.03.21 28/2020-21/83
Approved
39 Preet, 3549 Challenger
Batch 25.03.21 28/2020-21/84
Under Scrutiny
40 TAFE, MF 245 DI S6 Smart
ICT 27.03.21 28/2020-21/85
Approved
41 TAFE Ltd., MF 6028 Max Pro
ICT 09.04.21 28/2021-22/3
Under Scrutiny
42 John Deere, 5050D V1
Variant 14.04.21 28/2021-22/4
Under Scrutiny
43 Tafe, MF 1035 DI M8 Variant 16.04.21 28/2021-22/5
Under Scrutiny
44 Captain, 250 DI 4WD+
Batch 19.04.21 28/2021-22/6
Under Scrutiny
45 Mahindra, Jivo 305 DI 4WD
Variant 23.04.21 28/2021-22/7
Under Scrutiny
46 TAFE, MF 246 DI
ICT 28.04.21 28/2021-22/8
Under Scrutiny
47 TAFE, MF 241 DI Planetary plus V29
Variant 30.04.21 28/2021-22/9
Under Scrutiny
Note- Expected date of release of test report depend upon the date of receipt of test sample at this Institute.
1. Total number of Applications received: 47 2. No. Of Applications received for ICT: 10 3. No. Of Applications received for Conf: 01 4. No. Of Applications received for Batch test: 20 5. No. Of Applications received for variant Test: 07 6. No. of Applications received for O.E.C.D. test : 03 7. No. Of Applications received for Technical Extension: 06 8. No. Of Applications received for Administrative Extension: 00
(Y. K. RAO)
Senior Agricultural Engineer
Phone: 07564-234729
Email: [email protected]
Department
CENTRAL FAR
TR
-------------------------------------------------
No.: 20-3/2013- (Test) Dat
MONTHLY PROGRESS REPORT
1. OECD TESTING:
1. Machines carried forward
2. No. of applications receive
3. Progressive total of applica
4. No. of machines taken-up
5. Progressive total of machin
6. No. of machines under tes
7. No. of Draft Test Reports r
8. No. of Final Test Reports r
9. Progressive total of Final T
10. Draft test reports released
11. No. of machines under tes
12. Revenue received in this m
13. Received ground rent in th
14. Progressive revenue & Gro
2. EMISSION TESTING:
S.
No.
Emission certificates is
1. Emission Test Reports (ETR)
2. Type Approval (TA) certificate
3. Conformity of Production (CO
certificates
4. Development Test (DT) Repor
5. Extension certificate
6. Revenue received in this mon
7. Progressive revenue received
8 Ground rent received in this m
9 Progressive revenue & ground
received, (RS) during the year
Copy to:
1). The Director – For kind i
2). Test Engineer – For kind
Website:
Hkkjrljdkj Government of India
d̀f"k ,oafdlkudY;k.kea=ky; Ministry of Agriculture and Farmers Welfare
d`f"k] lgdkfjrk ,oafdlkudY;k.kfoHkkx tment of Agriculture, Cooperation and Farmers Welfare
dsUnzh; d`f"ke’khujhizf’k{k.k ,oaijh{k.klaLFkku FARM MACHINERY TRAINING & TESTING INSTITUT
VªSDVjuxj] cqnuh ¼e-iz-½ 466 445 TRACTOR NAGAR, BUDNI (M.P.) 466 445
-----------------------------------------------------------------------------
Dated: 03/05/2021
RT OF OECD & EMISSION TESTING ACTIVITIE
OF APRIL, 2021
SUMMARY
rd from the previous year
ived during the month
lication received during the year
up for test during the month
hines taken-up for tests during the year
test carried forward from the previous year
ts released during the month
s released during the month
l Test Reports released during the year 2021-202
ed, but final test reports yet to be released
test
s month, (Rs)
this month (Rs).
round Rent received, (Rs) during the year 2021-
tes issued During the
month
Progressive
during the year
(2021-22)
Nil Nil
icates Nil Nil
(COP) 01 01
eports Nil Nil
Nil Nil
month, (Rs) Nil
ived, (Rs) - Nil
his month Nil -
ound rent
year 2021-2022
- Nil
Senior Agric
d information please.
ind information please.
Fax: 07564-234743
ebsite: fmttibudni.gov.in
ITUTE
--------------------------------------
TIES FOR THE MONTH
06
Nil
Nil
Nil
Nil
06
Nil
Nil
022 Nil
02
06
79,978/-
Nil
-2022 79,978/-
Progressive
since
inception
Remarks
60 Nil
31 Nil
16 Nil
16 Nil
-- Nil
Nil
Nil
Nil
Nil
(Y. K. RAO)
gricultural Engineer
DATE STATUS OF TESTING OF DIFFERENT MACHINES AS ON 30/04 /2021
S. No.
Name of
Machine
Date of
completion
of the pre-
test
formalities
Nature of test
Date of start of
test
Present
position of test
Likely date for release of draft/
final report
Remarks
1 2 3 4 5 6 7 8
TRACTORS:
1 Solis 50, 4WD 12.10.20 OECD
Code-2
06.11.20 DTR under
preparation
May, 21 DTR allotted to
AE(PY)
2 Solis 26, 4WD 19.11.20 OECD
Code-2
07.12.20 DTR under
preparation
May, 21 DTR allotted to
AE(PY)
3 Solis Worldtrac 75, 4WD
01.12.20 OECD
Code-2
17.12.20 DTR under
preparation
May, 21 DTR allotted to
AE(PY)
4 Solis Worldtrac90, 4WD
21.12.20 OECD
Code-2
20.01.21 Under test June, 21 -
5 TAFE, MF 9515
28.12.20 OECD
Code-2
27.01.21 DTR released May, 21 The applicant
has been asked
to withdraw test
sample from test
dated: 26.04.21
6 TAFE, MF 1015
28.12.20 OECD
Code-2
27.01.21 DTR released May, 21 The applicant
has been asked
to withdraw test
sample from test
dated: 26.04.21
7 Solis 75 RX, 4WD
19.01.21 OECD
Code-2
23.02.21 Under test July, 21 -
8 Solis Worldtrac 105, 4WD
01.02.21 OECD
Code-2
09.03.21 Under test Aug, 21 -
DETAILS OF OECD & EMISSION TEST REPORTS RELEASED DURING THE YEAR 2021-2022:
1. OECD REPORTS.
S. No.
Make & Model of Tractor Type of test
Test Report Number Month & year
1 Nil Nil Nil Nil
2. EMISSION REPORTS:
S. No.
Make & Model of engine
Type of test
Certificate Number Test Report Number Date of issue
Next COP Due on.
1 Chaingchai
& H20N
CoP-1 CFMTTI/EC/CoP-
1/H20N/46/2021
CFMTTI/PTETR/CoP-
1/60/2021
30.04.2021 -
(Y. K. RAO)
Senior Agricultural Engineer
Min
Department odsUnzh
CENTRAL FARM
TR
File No.: 20-2/2014-(Test)
MONTH(FO
Sl.
No.
Certificates issued
1. CMVR Certificates
issued on various
tractors / Combine
Harvesters / Power
Tillers / CEV/Water
Tankers models
during the month.
Copy to:
1. The Director - For k
ne: 07564-234729
Email: [email protected]
Hkkjrljdkj
Government of India
d`f"k ,oafdlkudY;k.kea=ky;
Ministry of Agriculture and Farmers Welfare
d`f"k] lgdkfjrk ,oafdlkudY;k.kfoHkkx ent of Agriculture, Cooperation and Farmers Welfare Unzh; d`f"ke’khujhizf’k{k.k ,oaijh{k.klaLFkku ARM MACHINERY TRAINING & TESTING INSTITUTE
VªSDVjuxj] cqnuh ¼e-iz-½ 466 445
TRACTOR NAGAR, BUDNI (M.P.) 466 445
Dated: 03/05
THLY PROGRESS REPORT ON CMVR (FOR THE MONTH OFApril, 2021
During the
month
Progressive
(2021 - 22)
Progressiv
since
inception
tes
us
ine
er
ter
els
Nil
Nil
1558
¼okbZ- ds
Senior Agricult
or kind information Pl.
¼okbZ- ds
Senior Agricult
Web
UTE
5/2021
sive
ion
Remarks
--
ds-jko) / (Y.K.Rao)
ofj"Bd`f"kvfHk;ark/
ultural Engineer
ds-jko) / (Y.K.Rao)
ofj"Bd`f"kvfHk;ark/
ultural Engineer
Fax: 07564-234743
Website: fmttibudni.gov.in
(1) CMVR CERTIFICATES:
S.NO Certificate Issued
1. CMVR Certificates during the month.
2. Progressive total of certificates issued durinyear 2021-2022
(2) REVENUE RECEIVED:
1. Revenue received from the C
month, ( )
2. Progressive revenue rece
Extensions during the yea
3. Revenue received from the g
4. Progressive revenue recei
2022, ( )
5. Gross Total of S. No. (2) & (4
(3) DETAILS OF CMVR CEApril, 2021)):
Sr. No.
Make & model of Machi
(4) DETAILS OF CMVR CERTIApril, 2021):
Sl No Name of Machines tested
1 Nil
(5) DETAILS OF CMVR CERTIFApril, 2021):
Sl.No Name of Machines tested
1 Nil
Agril. Tractors
Combine Harvesters
Power Tillers
AgrilTraile
issued Nil Nil Nil Nil
f CMVR ring the Nil Nil Nil Nil
e CMVR Testing / Amendments / Extensions during
eceived from the CMVR Testing / Amendments
ear 2021-2022, ( )
e ground rent during the month, ( )
ceived from the ground rent during the year 20
(4)
CERTIFICATES ISSUED ON TRACTORS DURING T
Machine CMVR Certificate No.
RTIFICATES ISSUED ON POWER TILLER DURING
tested CMVR Certificated no. Date
Nil
IFICATES ISSUED ON Front End Loader DURING
sted CMVR Certificated no.
Nil
¼okbZ- ds
Senior Agricult
gril. ailers
Water Tanker
Front
End
Loader
Nil Nil Nil
Nil Nil Nil
ng the Nil
nts / 257076/-
Nil
2021- Nil
257076/-
G THE MONTH OF
Date of issued
G THE MONTH OF
Date of issued
Nil
G THE MONTH OF
Dated of issued
Nil
ds-jko) / (Y.K.Rao)
ofj"Bd`f"kvfHk;ark/
ultural Engineer
FARM ACTIVITIES FOR THE MONTH OF APRIL-YEAR 2021 -2022 Sl Name of crop, area
covered and yield
during the previous
year (ha) (2020-2021)
Name of crop,
area covered
during the month
ha(2021-22)
Progressive area
covered & yield
for different crops
during the year
2021-2120 (ha)
Remarks
1 KHARIF Paddy-
Area-22.00
ha .Yield
687.60
1
_ _ _
2 Red gram -
Area-2 ha . _ _ Crop yield yet to be auction.
RABI:
1 Gram JG-
130
Area - 6.8
ha
_ _ Crop yield yet to be auction.
2 Wheat
Area-20.00
ha
_ Crop yield yet to be auction.
Zaid Moong Area
5.94 ha _
3.2 ha Crop is in podding stage.
1
2 Orchard Sapota
Area -
5.99 ha.
Tree/Plant
- 307 Nos.
_ _ fruit crop auctioned.
1
2 Jack fruit
Area- 1.46
ha.
Tree/Plant
- 109 Nos
_ _
Fruit crop auctioned .
3 Mango
Area - 0.96
ha.
Tree/Plan
- 84Nos.
_ _
Fruit cropauctined .
4 Lemon
Area - 0.67
ha.
Tree/Plant
- 24 Nos.
_ _
flowering and fruit setting stage.
3 5 Orange
Area - 3.20
ha.
Tree/Plant
-440 Nos.
_ _
Crop is in vegetative stage .
4 Weather Rain fall received during the month is 0.00m.m. and cummulative rain recorded till date
30.04.2021 is 1664.6 mm.
Revenue During the month,revenue received Rs.722900/ The cummulative revenue till date
30.04.2021 is Rs 722900/
Jaibirsingh