TO THE DRAWINGS AND THE PROJECT MANUAL
PROJECT NAME & NUMBER: ALE Upgrades at Colby Glass Elementary School – 1748-06-01
RFCSP # 2021-003
CLIENT NAME: Northside ISD
LOCATION: San Antonio, Texas
PROPOSAL DATE: Tuesday, February 23, 2021, 10:30 AM
ADDENDUM DATE: Friday, February 19, 2021
For additional information regarding this project, contact: Sergio Alanis
THIS ADDENDUM INCLUDES:
Architectural Items Civil Items
MEP Items
1 Page 2 Pages
1 Page
AND ALL ATTACHED REVISED DRAWING AND SPECIFICATION SECTIONS REFERENCED IN THE ADDENDUM
Project Name: ALE Upgrades at Colby Glass Elementary School
Client: Northside ISD Project Number: RFCSP # 2021-003
Architectural Items For Addendum No. #1
Page 1 of 1
ARCHITECTURAL ITEMS FOR ADDENDUM NO. 2
NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it
had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take
precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications
and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS:
AD No 2, Arch. Item 1: To the Drawings, Sheet A4.2A, ADD ALT. FLOOR FINISH PLAN
1. Revised room H119B information on Room Finish Schedule
NISD PRE-PROPOSAL CONFERENCE AGENDA:
AD No 2, Arch. Item 2: To the NISD Pre-Proposal Conference Agenda
1. Part 6. Detailed Scope and Plan Discussion: Revised the date for the site visit to Monday, February 22, 2021 at
3:30 PM.
END OF ARCHITECTURAL ADDENDUM
2
12' MB
12' MB 4' TB
4' TB
12' MB4' TB
4' T
B6' M
B
F.E.
F.E
.
A4.3 6
5
8
7
A4.3 10
9
12
11
A8.1 4
A8.1
1
A8.1
2
A8.1
3
A8.1 58
A4.3
13
A8.1
9
A4.3 14
A4.315
A8.111
MECHANICAL
H121
PRE-K
H110
ALE
H111
KITCHEN
H111B
CLOSET
H110A
CLOSET
H109A
ECSE
H109
TOILET
H110B
BOYS
H113GIRLS
H115
KINDER
H118
TOILET
H118B
TOILET
H119B
CLOSET
H119A
CLOSET
H118A KINDER
H119
CORRIDOR
H100
1ST GRADE
H105
1ST GRADE
H103
1ST GRADE
H101
CLOSET
H101A
CLOSET
H103A
CLOSET
H105A
1ST GRADE
H104
1ST GRADE
H102
CLOSET
H102A
CLOSET
H104A
IDF
H112
CUST
H114
WOMEN
H107
MEN
H106
KINDER
H116
KINDER
H117CLOSET
H117A
CLOSET
H116A
TOILET
H117B
TOILET
H116B
MECHANICAL
H121
PRE-K
H110
ALE
H111
KITCHEN
H111B
TOILET
H111C
CLOSET
H111A
ELECTRICAL
H120
CLOSET
H109A
ECSE
H109
TOILET
H109B
BOYS
H113GIRLS
H115
ELECT.
H108
KINDER
H118
TOILET
H118B
TOILET
H119B
CLOSET
H119A
CLOSET
H118A KINDER
H119
1ST GRADE
H105
1ST GRADE
H103
1ST GRADE
H101
CLOSET
H101A
CLOSET
H103A
CLOSET
H105A
1ST GRADE
H104
1ST GRADE
H102
CLOSET
H102A
CLOSET
H104A
IDF
H112
CUST
H114
WOMEN
H107
MEN
H106
KINDER
H116
KINDER
H117CLOSET
H117A
CLOSET
H116A
TOILET
H117B
TOILET
H116B
TR01
VC
T02
VCT01
VC
T02
VCT01
VCT02
VCT01
VCT02
VCT01
VCT02
VCT01
24' - 0" 2' - 0 1/4"
2' -
0"27
' - 0
"2'
- 6"
26' -
0"
2' -
0"
2' -
0"7'
- 0"
1' -
2 1/
2"
2' - 0" 23' - 0"
7' - 0" 13' - 0"
TR01
VCT02
VCT01
VC
T02
VCT01 VC
T02
VCT01
VCT02
VCT01
VCT02
VC
T02
2' - 0" 6' - 0" 4' - 0" 5' - 0" 9' - 0"
2' -
0"28
' - 0
"
TR01
VCT02
VCT01
VC
T02
VCT01
VC
T02
VCT01
VCT02
VCT01
VCT02
VCT02
VCT01
VC
T02
VCT01
FD
A8.112
A8.1 13
A8.1 10
A4.2A 3
2
5
4
A4.2A
2
5
4
3
A4.2A
6
79
8
A4.2A
6
7
8
9
A4.3
16
A4.3 17
A4.2A 10
BRK- BRICK
BR- BASE, RUBBER
BTC- BASE, TILE, CERAMIC
BTER- BASE, TERRAZZO
CG- CORNER GUARD
COS- CONCRETE SEALED
N/A- NOT APPLICABLE
PNT- PAINT
SPEC- SPECIAL FINISHES, REF. ROOM FINISH SCHEDULE &
INTERIOR ELEVATIONS
TC- TILE, CERAMIC
TM- TILE, MOSAIC
VCT- TILE, VINYL COMPOSITION
TR- THRESHOLD - MARBLE
TER- TERRAZZO
VWC- VINYL WALL COVERING
NOTES APPLY TO ROOMS AS NOTED IN THE ROOM FINISH TAGS.
SEE TAG LAYOUT ABOVE.
1. PROVIDE TM AND VCT FLOOR FINISHES, AS DEFINED ABOVE,
IN LOCATIONS INDICATED ON PLANS.
2. PROVIDE PNT AND TC (WAINSCOT) WALL FINISHES AS DEFINED
ABOVE AND DETAILED ON INTERIOR ELEVATIONS.
3. PROVIDE VWC WALL FINISHES AS DEFINED ABOVE AND
DETAILED ON INTERIOR ELEVATIONS.
4. PROVIDE 3/8" MIN SEALANT JOINT WHERE FULL HT TILE MEETS
GYP CLG (MATCH CLG COLOR) OR LAY-IN GRID (WHITE)
5. PROVIDE SEALANT JT'S @ INSIDE CORNERS OF TILED WALLS
6. ALL FLOORING TO EXTEND UNDER CASEWORK AND SHELVING.
7. NEW SIGNAGE THROUGH OUT. IF ADD ALT #2 IS NOT EXCEPTED
GC TO TOUCH UP PAINT WHERE NEW SIGNAGE OCCURS.
REFER TO PROJECT SPECIFICATIONS SECTION 01 6210 FOR
ADDITIONAL INFORMATION REGARDING FINISH MATERIALS AND
PAINT FINISH CODES.
X Y
MATERIAL TYPE
# #
FINISH COLOR AND MATERIAL
SIZE AS NOTED IN SPEC.
SECTION 01 6210
COMMENTS
FINISH KEY
FINISH PLAN LEGEND
A1.1 1
1
A1.1
1
A101
SIM
ELEVATION REFERENCE
CALLOUT REFERENCE
WALL SECTION REFERENCE
CORNER GUARD REFERENCE
APPLIES TO SECTION PLANS
FINISH KEY
VCT01 - FIELD
VCT02 - GREEN TM01
COS
EXISTING - NOT IN
SCOPE
VCT03 - BLUE
VCT04 - YELLOW
VCT05 - TAUPE
VCT06 - GRAY
ADD ALTS. NOTES & DESCRIPTIONS
NOTES APPLY TO ROOMS AS NOTED IN THE ROOM FINISH TAGS.
SEE TAG LAYOUT ABOVE.
INTERIOR ADD ALT #2:
1. PAINT ALL ROOMS. REF ROOM FINISH SCHEDULE ADD ALT.
ON SHEET. NOTE: DO NOT PAINT VINYL WALL COVERING (VWC).
2. NEW RUBBER BASE. REF ROOM FINISH SCHEDULE ADD ALT.
ON SHEET.
3. NEW BLINDS ON EXISTING WINDOWS THRU OUT.
INTERIOR ADD ALT #3:
1. NEW CERAMIC TILE IN RESTROOMS. REF ROOM FINISH
SCHEDULE ADD ALTS. AND ELEVATIONS FOR EXTENTS AND
WALL PATTERN. IF ALT#3 ACCEPTED ALL EXISTING PLUMBING
FIXTURES, PARTITIONS AND TOILET ACCESSORIES WILL BE
REMOVED AND REINSTALLED AFTER CERAMIC TILE INSTALLED -
TYP.
2. NEW CERAMIC TILE AT WATER COOLERS. IF ALT#3 IS
ACCEPTED ALL EXISTING PLUMBING FIXTURES WILL BE
REMOVED AND REINSTALLED AFTER CERAMIC TILE IS
INSTALLED.
INTERIOR ADD ALT #4:
1. TERRAZZO FLOORS AND BASE IN RESTROOMS - GRIND AND
RESURFACE WITH SEALER . REF ROOM FINISH SCHEDULE ADD
ALTS. ON SHEET.
8' -
0"
TC044"
TC01
3' -
2"
TC04
1' -
1"
TC01
3' -
1"
TC01, TC04
8' - 1"
TC03, TC05
12' - 8" TC01, TC046"
TC01, TC04
4' - 5"
25' - 7"
EXISTING
BTER
TC03 TC05EXISTING FIXTURES FOR
REFERENCE ONLY
TC04
TC01
TC04
TC01
TC01
3' -
1"
TC04
1' -
1"
TC01
3' -
2"
TC044"
EXISTING FIXTURES
FOR REFERENCE ONLY
EXISTING
BTER
TC03 & TC05 TO
WRAP INSIDE WALL
TC03
TC05
TC03
TC05
8' -
0"
TC054"
TC03
3' -
2"
TC05
1' -
1"
TC03
3' -
1"
TC01, TC045"
TC01, TC04
17' - 3"
TC03, TC05
7' - 10"
TC03 & TC05 TO WRAP
INSIDE WALL
8' -
0"
25' - 7"
EXISTING
BTER
TC04
TC01
TC04
TC01
TC044"
TC01
3' -
2"
TC04
1' -
1"
TC01
3' -
1"
TC03, TC059"
3' - 4"
TC03, TC05
1' - 9"
TC01, TC04
8' - 3"
14' - 1"
EXISTING DOOR
TC03
TC05
EXISTING
BTER
TC03
TC05
TC01
4' -
1"
TC04
1' -
1"
TC01
3' -
2"
TC044"
TC01, TC04
7' - 9"
TC03, TC05
6' - 8"
TC01, TC04
1' - 4"
15' - 10"
TC03TC05
TC01
TC04
TC04
TC01
EXISTING BTER
EXISTING FIXTURES
FOR REFERENCE ONLY
9' - 7"TC044"
TC01
3' -
2"
TC04
1' -
1"
TC01
4' -
1"
9' -
0"
EXISTING
BTER
EXISTING
FIXTURES
FOR REFERENCE
ONLY
TC044"
TC01
3' -
2"
TC04
1' -
1"
TC01
4' -
1"
EXISTING
BTER
TC044"
TC01
3' -
2"
TC04
1' -
1"
TC01
4' -
1"
TC01, TC04
3"
TC03, TC05
6' - 9"
TC01 & TC04 TO WRAP
AROUND WALL
EXISTING
DOOR
TC03
TC05
TC03
TC05
EXISTING
BTER
TC01, TC04
2' - 7"
4"3'
- 2"
1' -
1"4'
- 5"
3' - 9" 2' - 8"
TC01
TC01
TC04
TC05
TC05
TC03
TC03
9' -
0"
6' - 5"
FIXTURES
FOR REFERENCE ONLY
Sheet No.Job No.
Drawn By:
Date:
Pro
ject
:
Copyright © 2021, Huckabee & Associates, Inc.
C:\
Use
rs\s
erg
io.a
lan
is\D
ocu
men
ts\0
1748
-06-
01_N
ort
hsi
de
ISD
Gla
ss E
S A
LE
_ser
gio
.ala
nis
GH
AR
R.r
vt
2/19
/202
1 10
:23:
37 A
M
GB
A4.2A
ADD ALT. FLOOR FINISH
PLAN
01/13/2021
01748-06-01
NO
RTH
SID
E IN
DE
PE
ND
EN
T S
CH
OO
L D
ISTR
ICT
ALE
UP
GR
AD
ES
AT
CO
LBY
GLA
SS
ELE
ME
NTA
RY
SC
HO
OL
SA
N A
NTO
NIO
, TE
XA
S
1/8" = 1'-0"1FLOOR PATTERN PLAN
N
PLAN
N
TRUE
ROOM FINISH SCHEDULE ADD ALTS
ROOM FLOORFINISH BASE
WALL FINISH
COMMENTSNUMBER NAME N FINISH E FINISH S FINISH W FINISH
H101 1ST GRADE N/A BR01 PNT01 N/A PNT01 PNT01 DO NOT PAINT EXISTING VWC
H101A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H102 1ST GRADE N/A BR01 PNT01 PNT01 PNT01 N/A DO NOT PAINT EXISTING VWC
H102A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H103 1ST GRADE N/A BR01 PNT01 N/A PNT01 PNT01 DO NOT PAINT EXISTING VWC
H103A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H104 1ST GRADE N/A BR01 PNT01 PNT01 PNT01 N/A DO NOT PAINT EXISTING VWC
H104A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H105 1ST GRADE N/A BR01 PNT01 N/A PNT01 PNT01 DO NOT PAINT EXISTING VWC
H105A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H106 MEN TER BTER TC01-TC05 TC01-TC05 TC01-TC05 TC01-TC05 REF ELEVATION FOR TILE PATTERN
H107 WOMEN TER BTER TC01-TC05 TC01-TC05 TC01-TC05 TC01-TC05 REF ELEVATION FOR TILE PATTERN
H108 ELECT. N/A - PNT01 PNT01 PNT01 PNT01
H112 IDF N/A BR01 PNT01 PNT01 PNT01 PNT01
H113 BOYS TER BTER TC01-TC05 TC01-TC05 TC01-TC05 TC01-TC05 REF ELEVATION FOR TILE PATTERN
H114 CUST N/A - PNT01 PNT01 PNT01 PNT01
H115 GIRLS TER BTER TC01-TC05 TC01-TC05 TC01-TC05 TC01-TC05 REF ELEVATION FOR TILE PATTERN
H116 KINDER N/A BR01 N/A PNT01 PNT01 PNT01 DO NOT PAINT EXISTING VWC
H116A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H116B TOILET N/A N/A N/A N/A N/A N/A NO WORK IN THIS AREA
H117 KINDER N/A BR01 N/A PNT01 PNT01 PNT01 DO NOT PAINT EXISTING VWC
H117A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H117B TOILET N/A N/A N/A N/A N/A N/A NO WORK IN THIS AREA
H118 KINDER N/A BR01 PNT01 PNT01 N/A PNT01 DO NOT PAINT EXISTING VWC
H118A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H118B TOILET N/A N/A N/A N/A N/A N/A NO WORK IN THIS AREA
H119 KINDER N/A BR01 PNT01 PNT01 N/A PNT01 DO NOT PAINT EXISTING VWC
H119A CLOSET N/A BR01 PNT01 PNT01 PNT01 PNT01 PAINT EXISTING SHELVING
H119B TOILET N/A N/A N/A N/A N/A N/A NO WORK IN THIS AREA
1/4" = 1'-0"3EV-INT - GANG RESTROOM 2 TYP.
1/4" = 1'-0"2EV-INT - GANG RESTROOM 1 TYP.
1/4" = 1'-0"5EV-INT - GANG RESTROOM 4 TYP.
1/4" = 1'-0"4EV-INT - GANG RESTROOM 3 TYP.
1/4" = 1'-0"6EV-INT - SM. GANG RR NORTH
1/4" = 1'-0"7EV-INT - SM. GANG RR EAST
1/4" = 1'-0"8EV-INT - SM. GANG RR SOUTH
1/4" = 1'-0"9EV-INT - SM. GANG RR WEST
1/4" = 1'-0"10EV-INT - WATER COOLER IN CORRIDOR
2
Rev
isio
n /
Dat
e
20
2/1
9/ 2
1A
dde
ndu
m 2
ALE Upgrades at Colby Glass Elementary School
Pre-Proposal Conference Agenda February 16, 2021
1/3
1. Northside ISD Team
● Director of Facilities Construction- James Evans
● Project Manager – Adam Castillo
● Construction Inspections Manager – Wayne Cure
● Lead Inspector – Frank Kittchner
2. Project Team
● Prime Consultant – Huckabee
Project Architect – Jeff Rodriguez
● Civil Engineer – Maestas and Associates
● Landscaping – N/A
● Structural Engineer – Intelligent Engineering Services-
● MEP Engineer – KCA Engineers
● Technology – DBR
● GeoTech/CMT – Rock Engineering
● Roofing – Hollon and Cannon Group
● RAS – TBD – N/A
3. Project Information
● ALE Upgrades at Colby Glass Elementary School
● List RFCSP# 2021-003
● Proposals will be received by the NISD Purchasing Dept. in person at 607 Richland Hills Dr. #700, San
Antonio, TX 78245-2149 or electronically through the District’s ESM solution on or before February
23, 2021 at 10:30am. Please refer to NISD Purchasing website for details and instructions on the use
of the District’s ESM Solution.
● Brief Project scope description. Complete HVAC upgrade of the existing H building and 1,225 SF
addition to Building ‘H’ at Colby Glass Elementary. Addition & renovation consists of enlarging existing
ALE, ECSE, and Pre-K classrooms, their respective bathrooms and closets, new Teaching Kitchen, and
new Mechanical and Electrical rooms.
● Successful Offeror will be notified on or before March 24, 2021.
● Project must be complete and ready for occupancy no later than December 28, 2021.
● The project budget is listed as $2,700,000.00
● Plans are available through the consultant or certain plan houses. Coordinate with consultant. Please
sign the sign in sheet which will be distributed as an addendum. If attending virtually please identify
yourself, the company you’re representing, and your email in the chat. If you are joining us through
phone conference, please email Jeff Rodriguez at [email protected] to ensure your
presence is documented in the sign in sheet.
● Request for clarifications or interpretations shall be submitted in writing no later than five days prior
to the last date for receipt of proposals. All request shall be submitted to the consultant and
questions will be responded to where appropriate in the form of an addendum to all plan holders and
interested parties.
4. Proposal Documents
● Proposal shall be submitted with the proper proposal security as defined in the Front End
Specification and shall include all alternates, project name and number and original copies with
original signatures and seals. Proposal security needs to be submitted with the proposal package
meeting the requirements listed on NISD Purchasing website.
ALE Upgrades at Colby Glass Elementary School
Pre-Proposal Conference Agenda February 16, 2021
2/3
● Contractors are encouraged to refer to Proposal Checklist listed in the Table of Contents, which
identifies forms to be submitted and the number of copies for consideration.
● Proposal Form
o Offeror will list bid pricing both numerically and written for base bid and alternate(s). Base bid
sum will include allowance(s) as listed in Item #1 of the Proposal Form. (Contingency
$100,000.00, Structural Steel Allowance $5,000.00, TAB $24,000.00, Structural Concrete Rebar
$3,000.00, Unit Price Allowance $20,000.00)
o Offeror will list the names of the Project Manager, Project Superintendent. A single person
cannot be listed as a Project Manager and Project Superintendent. If two names are provided for
Project Manager and/or Project Superintendent, both resumes will be reviewed and the points
will be issued based on the individual with the least amount of experience. Please note resumes
for the Project Manager and Project Superintendent will need to be submitted under Exhibit B-
Project Management Ability. Any other resumes provided may be reviewed, but will not be
considered for experience as a Project Manager and/or Project Superintendent.
5. Proposal Selection Criteria
● NISD ranks offerors by best value and not by lowest bid. Therefore, it is important to submit a
complete proposal package as identified in the Front End Specifications.
● Proposals are evaluated on five divisions
o Relevant Experience
o Project Management Ability
o Past Performance
o Subcontractor and Supplier Support Capability
o Price Proposal
● Per the Evaluation Matrix provided in the Front End Specifications each division will be evaluated by
but not limited to a committee consisting of NISD Administrators, NISD Project Manager and
Consultant(s).
o Relevant Experience (Max 10 Pts)
o Experience as a Contractor (Max 3 Pts) – Number of years as a contractor under the
submitted Contracting name and as listed in the A-305 - Contractor Qualification Statement.
In order to receive max points, the contractor will need to reflect 9 or more years in business
on the Contractor Qualification Statement A-305 under the submitted contracting name.
o Representative Projects (Max 7 Pts) – List of projects of similar dollar value (in relation to the
Budget) and scope, which are substantially complete. List shall include Project Name,
Architect/Engineer, Cost of Project, date of completion, scope of project and Contact Person.
Projects are not required to be K-12 or education related facilities. In order to receive max
points contractor will need to provide 7 or more projects and will not be penalized for
submitting additional projects.
o Project Management Ability (Max 15 Pts)
o Project Manager Experience (Max 6 pts) – Offeror shall provide a resume(s) for the
individual(s) listed on the Proposal Form for review under Exhibit B-Project Management
Ability. Resume(s) shall provide experience of the individual(s) as a Project Manager, with the
current or past employers. Total years of construction experience will not suffice. Years as an
owner of a contracting company can supplement experience.
o Project Superintendent Experience (Max 6 pts) – Offeror shall provide a resume(s) for the
individual(s) listed on the Proposal Form for review under Exhibit B-Project Management
Ability. Resume(s) shall provide experience of the individual(s) as a Project Superintendent,
ALE Upgrades at Colby Glass Elementary School
Pre-Proposal Conference Agenda February 16, 2021
3/3
with the current or past employers. Total years of construction experience will not suffice.
Years as an owner of a contracting company can supplement experience.
o Project Support (Max 3 Pt) – Offeror shall provide written evidence of sufficient resources
necessary to manage, staff and successfully complete the project. This written description
shall include the year the company was founded, number of offices, number of employees
and additional resources to ensure the completion of the project by the listed deadlines.
Offeror is encouraged to provide an organizational chart.
o Past Performance (Max 15 Pts) – Contractors with no prior experience with any NISD will be
given points based on the references/information provided by clients/End users listed in the
Exhibit A – Relevant Experience portion of the proposal. All contractors with experience with
NISD will be evaluated based on their recent substantially complete projects.
o Timely Completion (Max 3 pts)
o Cooperation with Owner(s) Owner’s Representative, and Consultants (Max 3 pts)
o Coordination of Trades (Max 3 pts)
o Quality of Workmanship (Max 2 pts)
o Warranty Responsiveness (Max 2 pts)
o Punchlist Length & Completion (Max 1pts)
o Safety Record (1pt)
o Subcontractor and Supplier Support Capability (Max 25 Pts) – Offeror will be evaluated based
on subcontractors and suppliers listed under Schedule 2 in the proposal package. Please note all
Items of Work need to have the name of subcontractor/supplier. If multiple names are
provided for a single item of work, contractor runs the risk of submitting a non-compliant bid.
The district reserves the right on how to evaluate the bid. If the prime contractor is self-
performing the work, the prime contractors name needs to be listed on the Schedule 2 and
the type of work being performed needs to be listed on the A-305 - Contractor’s Qualification
Statement under paragraph 3.1. All omissions on the Schedule 2 will receive no points for the
Item of Work omitted. Any licensed trades need to be registered with TDLR.
o Site Work (Max 2.5 Pts)
o Structural (Max 3.25_ Pts)
o Architectural (Max _ 8_ Pts)
o Mechanical ( Max 4.5 Pts)
o Electrical ( Max 4.5 Pts)
o Plumbing (Max _ 2.25_ Pts)
o Price Proposal (Max 35 Pts) – Offeror submitting the lowest bid proposal will receive the
maximum points and all other offerors will receive points based on the price percentage above
the lowest bid. The percentage scale will be based on the size and budget of the project. NISD
reserves the right to accept alternates in any order or combination to determine the total cost
of the submitted bids.
6. Detailed Scope and Plan Discussion
● At this time all questions need to be submitted to the consultant via email for a formal response
through addendum.
● We will proceed with the review of the current bid set made available by the consultant. A site visit
will be arranged for those interested on February 22, 2021 at 3:30pm.
Project Name & Number: ALE Upgrades at Colby Glass Elementary School 1748-06-01 Northside ISD San Antonio, Texas
Architectural Items For Addendum No. 2
Page 1 of 2
(CIVIL SITE) ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it
had been issued at the same time and incorporated integrally therewith. Where provisions of the following
supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications
and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the
proposal form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
PROJECT MANUAL:
AD No 2, (CIV). Item 1: To the Project Manual, Section 32 0519.19 (Geogrid)
1. Part 2 Materials: Revised to not allow substitutions for TENSAR Geogrid TX-5. See attached revised specification.
2. Part 3 Construction, 3.01 General, A: Added subgrade preparation details prior to installing geogrid. See attached revised specification.
AD No 2, (CIV). Item 2: To the Project Manual, Section 32 1116.16 (Flexible Base)
1. Part 2 Materials, 2.01: Revised to require base materials to conform to TxDOT Item 247 Type A, Grade 1-2. See attached revised specification.
2. Part 3 Construction, 4.02: Added compaction requirements for the upper 6” of compacted subgrade. See attached revised specification.
3. Part 3 Construction, 4.02, B. Compaction, b. Density Control: Revised compaction requirements for flexible
base materials. See attached revised specification.
AD No 2, (CIV). Item 3: To the Project Manual, Section 32 1623 (Concrete Sidewalks, Curb, and Driveways)
1. Part 3 Construction, E: Added all reinforced concrete driveway pavement shall have a 6” flexible base subgrade to conform to Section 32 1116.16 Flexible Base. See attached revised specification.
DRAWINGS:
AD No 2, (CIV). Item 1: To the Drawings, Sheet C1.0, (Overall Site Control, General Notes, Civil Quantities) 1. Summary of Quantities (Base Bid): Revised base bid quantities for Section Item 32 1116.15 Flexible Base
(6” Compacted Depth) and Section Item 32 1623.4 Reinforced Concrete Pavement. See attached revised
Sheet C1.0.
AD No 2, (CIV). Item 2: To the Drawings, Sheet C3.0, (Grading Plan)
1. Added notes to clarification on where Walkway Asphalt is to be installed for the base and alternate bid locations. See attached revised Sheet C3.0.
2-17-2021
Project Name & Number: ALE Upgrades at Colby Glass Elementary School 1748-06-01 Northside ISD San Antonio, Texas
Architectural Items For Addendum No. 2
Page 2 of 2
2. Revised the Walkway Asphalt Typical Section to include 6” Compacted Depth subgrade under the flexible
base material. See attached revised Sheet C3.0. 3. Revised the Walkway Asphalt Typical Section to specify 6” Flexible Base to be TxDOT Item 247 Type A,
Grade 1-2. See attached revised Sheet C3.0. 4. Revised the Typical Section for the Fire Lane to specify the geogrid as TENSAR Geogrid TX-5. See attached
revised Sheet C3.0.
5. Revised Typical Section for the Fire Lane to specify 8” Flexible Base to be TxDOT Item 247 Type A, Grade 1-2. See attached revised Sheet C3.0.
6. Added hatching and notes delineating a revised (increased) area for Reinforced Concrete Driveway Pavement at the south connection of the Fire Lane to the school drive through lane. See attached revised
Sheet C3.0.
AD No 2, (CIV). Item 3: To the Drawings, Sheet C5.0, (Water Layout) 1. Revised note for the installation of a Double Check Valve and a 5’ x 7.5’ Concrete Vault as per details
provided on Sheet C12.0 and included in Addendum 1. See attached revised Sheet C5.0.
AD No 2, (CIV). Item 4: To the Drawings, Sheet C8.0 (Miscellaneous Civil Details Sheet 1)
1. Added a Typical Section for Reinforced Concrete Driveway Pavement. See attached revised Sheet C8.0.
AD No 2, (CIV). Item 5: To the Drawings, Sheet C12.0 (Miscellaneous SAWS Detail Sheet 1)
1. Detail DD-812-01, Note 1.C: Revised the note to state concrete pavement replacement sections shall
conform to the Reinforced Concrete Driveway Pavement section shown on Sheet C8.0. See attached revised Sheet C12.0.
END OF (CIVIL SITE) ADDENDUM 2
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 05 19.19 - 1
GEOGRID
SECTION 32 05 19.19
GEOGRID
PART 1 – GENERAL
1.01 DESCRIPTION: Furnish and place TENSAR Geogrid (TX-5) in accordance with the lines and grades shown on the plans or as directed by the Engineer.
PART 2 - MATERIALS
2.01 MATERIALS: Provide TENSAR Geogrid (TX-5) in conformance with the Items and requirements stated herein. No material substitutions will be allowed for geogrid on this project unless the contactor can prove the unavailability of the preferred product. In cases that substitutions are allowed by the owner and engineer, the material must conform to the following:
2.01.1 Geogrid Reinforcement. Texas Department of Transportation Materials Specification DMS 6240, “Geogrid for Base/Embankment Reinforcement,” of the type as shown on the plans. The sampling, testing, and rejection criteria of that specification shall govern.
2.01.2 Unapproved Materials. Material substitutions for geogrids not conforming to the physical requirements of TxDOT DMS 6240 must be submitted with an alternative design proposal to the Engineer for consideration. Alternate design proposals must be accompanied by the test data from an approved laboratory showing all design and index properties in accordance with the test properties shown in TxDOT DMS 6240. If approved, the Engineer will provide written authorization. Allow a minimum of 14 days for the approval process.
PART 3 – CONSTRUCTION
3.01 GENERAL:
A. Subgrade soil shall be prepared in accordance with City of San Antonio Specification Item 104, “Street Excavation and Item 107, “Embankment”. The upper 6 inches of subgrade shall be compacted to 95% of maximum dry density as determined by the standard proctor test (ASTM D698). The moisture content of subgrade soils should be maintained between -1 to +3 percentage points of the optimum moisture content.
B. Geogrid reinforcement shall be rolled out parallel to the road direction at the proper elevation and alignment as shown on the construction drawings.
C. Geogrid sections shall be overlapped a minimum of 1 foot in both directions. Placement of geogrid around corners will require cutting of geogrid product and diagonal overlapping. Unless otherwise directed by the Engineer, plastic ties shall be used at overlaps. The transverse spacing
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 05 19.19 - 2
GEOGRID
of the ties shall be 4 to 5 feet and the longitudinal tie spacing shall be 10 to 20 feet, unless otherwise approved by the Engineer.
D. The geogrid shall be pinned at the beginning of the backfilling section, but shall be left free to stretch or relieve tension throughout the remainder of the work area.
E. Contractor shall take steps to ensure that geogrid sections do not separate at overlaps during construction.
F. Base material shall be placed and compacted in accordance with the City of San Antonio Specification Item 200, “Flexible Base”. This material shall be back dumped from trucks riding on top of the reinforced base material and bladed on to the grid area.
G. Tracked construction equipment shall not operate directly upon the geogrid. A minimum base thickness of 6 inches is required prior to operation of trucked vehicles over the geogrid.
H. Rubber tired equipment may pass over the geogrid at slow speeds, less than 5 miles per hour if the subgrade material is capable of supporting the loads without excessive rutting or causing damage to the grid. Equipment operators shall avoid sudden braking or sharp turning.
I. If ruts are created in the base material due to construction traffic, they shall be filled with additional base material rather than blading adjacent material into the rut.
J. Sections of geogrid, which are damaged by construction activity, shall be repaired or replaced at the Contractor’s expense. All repaired sections shall contain a minimum 3 foot overlap in all directions.
PART 4 – MEASUREMENT
4.01 MEASUREMENT: Accepted work performed as prescribed by this item will be measured by the square yard of base reinforcement complete in place in accordance with the plans with no allowance made for width of overlaps required.
PART 6 – PAYMENT
5.01 PAYMENT: The work performed as prescribed by this item will be paid for at the contract unit price bid per square yard, measured as prescribed above, for “Base Reinforcement” which price shall be full compensation for furnishing all labor, materials, equipment and other items necessary and incidental to completion of work.
A. END OF SECTION
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 1116.16 - 1
FLEXIBLE BASE
SECTION 32 1116.16
FLEXIBLE BASE
PART 1 – GENERAL
1.01 DESCRIPTION: Construct a base course for surfacing, pavement, or other base courses composed of crushed stone, and constructed as herein specified in one or more courses in conformance with the typical sections shown on the plans and to the lines and grades as established by the Engineer.
PART 2 - MATERIALS
2.01 MATERIALS: Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and specifications. Notify the Engineer of the proposed material sources and of changes to material sources. The Engineer may sample and test project materials at any time before compaction throughout the duration of the project to assure specification compliance.
Base materials should meet the requirements set forth in the Texas Department of Transportation (TxDOT) 2014 Standard Specifications for Construction of Highways, Streets and Bridges; Item 247, Type A, Grade 1-2.
PART 3 - EQUIPMENT
3.01 EQUIPMENT: Provide machinery, tools, and equipment necessary for proper execution of the work. Provide rollers in accordance with Item 210, “Rolling.” Provide proof rollers in accordance with TxDOT Item 216, “Proof Rolling,” when required.
PART 4 – CONSTRUCTION
4.01 GENERAL: Construct each layer uniformly, free of loose or segregated areas, and with the required density and moisture content. Provide a smooth surface that conforms to the typical sections, lines, and grades shown on the plans or as directed. Stockpile base material temporarily at an approved location before delivery to the roadway. Build stockpiles in layers no greater than 2 feet thick. Stockpiles must have a total height between 10 and 16 feet unless otherwise shown on the plans. After construction and acceptance of the stockpile, loading from the stockpile for delivery is allowed. Load by making successive vertical cuts through the entire depth of the stockpile. Do not add or remove material from temporary stockpiles that require sampling and testing before delivery unless otherwise approved. Charges for additional sampling and testing required as a result of adding or removing material will be deducted from the Contractor’s estimates. Haul approved flexible base in clean trucks. Deliver the required quantity to each 100-foot station or designated stockpile site as shown on the plans. Prepare stockpile sites as directed. When delivery is to the 100-foot station, manipulate in accordance with the applicable Items.
4.02 Preparation of Subgrade or Existing Base. Remove or scarify existing asphalt concrete pavement in accordance with Item 104, “Street Excavation,” when shown on the plans or as directed. Shape the subgrade or existing base to conform to the typical sections shown on the plans or as directed. When new base is required to be mixed with existing base, deliver, place, and spread the new flexible base in the required amount per station. Manipulate and thoroughly mix the
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 1116.16 - 2
FLEXIBLE BASE
new base with existing material to provide a uniform mixture to the specified depth before shaping. When shown on the plans or directed, proof roll the roadbed in accordance with TxDOT Item 216, “Proof Rolling,” before pulverizing or scarifying. Correct soft spots as directed. The upper 6 inches of subgrade shall be compacted to 95% of maximum dry density as determined by the standard proctor test (ASTM D698). The moisture content of subgrade soils should be maintained between -1 to +3 percentage points of the optimum moisture content.
A. Placing. Spread and shape flexible base into a uniform layer with an approved spreader the same day as delivered unless otherwise approved. Construct layers to the thickness shown on the plans. Maximum lift thickness shall be 8 inches of loose material. Maintain the shape of the course. Control dust by sprinkling, as directed. Correct or replace segregated areas as directed, at no additional expense to the City. Place successive base courses and finish courses using the same construction methods required for the first course.
B. Compaction. Compact in courses not to exceed 8 inches compacted depth using density control unless otherwise shown on the plans. Multiple lifts are permitted when shown on the plans or approved. Bring each layer to the moisture content directed. When necessary, sprinkle the material in accordance with TxDOT Item 204, “Sprinkling.” Begin rolling longitudinally at the sides and proceed towards the center, overlapping on successive trips by at least ½ the width of the roller unit. On superelevated curves, begin rolling at the low side and progress toward the high side. Offset alternate trips of the roller. Operate rollers at a speed between 2 and 6 mph as directed. Rework, recompact, and refinish material that fails to meet or that loses required moisture, density, stability, or finish before the next course is placed or the project is accepted. Continue work until specification requirements are met. Perform the work at no additional expense to the City.
a. Ordinary Compaction. Roll with approved compaction equipment as directed. Correct irregularities, depressions, and weak spots immediately by scarifying the areas affected, adding or removing approved material as required, reshaping, and recompacting.
b. Density Control. Compact to a minimum density of 95% of the maximum dry density determined by the modified Proctor test (ASTM D1557). The moisture content of the base materials show be maintained within 2 percentage points of the optimum moisture content. The Engineer will determine roadway density of completed sections in accordance with TxDOT’s standard laboratory test procedure Tex-115-E. The Engineer may accept the section if no more than 1 of the 5 most recent density tests is below the specified density and the failing test is no more than 3 pounds per cubic foot below the specified density.
C. Finishing. After completing compaction, clip, skin, or tight-blade the surface with a maintainer or subgrade trimmer to a depth of approximately ¼ inch. Remove loosened material and dispose of it at an approved location. Seal the clipped surface immediately by rolling with a pneumatic tire roller until a smooth surface is attained. Add small increments of water as needed during rolling. Shape and maintain the course and surface in conformity with the typical sections, lines, and grades as shown on the plans or as directed. In areas where surfacing is to be placed, correct grade deviations greater than ¼ inch in 16 feet measured longitudinally or greater than ¼ inch over the entire width of the cross-section. Correct by loosening, adding, or removing material. Reshape and recompact in accordance with Section 200.4.C, “Compaction.”
D. Curing. Cure the finished section until the moisture content is at least 3 percentage points below and above optimum or as directed before applying the next successive course or prime coat.
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 1116.16 - 3
FLEXIBLE BASE
PART 5 – MEASUREMENT
5.01 MEASUREMENT: Flexible base will be measured by the square yard method per thickness shown in the proposal. Measurement by the square yard is a plans quantity measurement. The quantity to be paid for is the quantity shown in the proposal unless modified by the Engineer. Additional measurements or calculations will be made if adjustments of quantities are required. Measurement is further defined for payment by the square yard of surface area in the completed and accepted final position. The surface area of the base course is based on the width of flexible base as shown on the plans.
PART 6 – PAYMENT
6.01 PAYMENT: The work performed, and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for the types of work shown below. No additional payment will be made for thickness or width exceeding that shown on the typical section or provided on the plans for square yard measurement.
Sprinkling and rolling will not be paid for directly but will be subsidiary to this Item unless otherwise shown on the plans.
Where subgrade is constructed under this Contract (Subgrade Treatment), correction of soft spots in the subgrade will be at the Contractor’s expense. Where subgrade is not constructed under this project, correction of soft spots in the subgrade will be paid in accordance with pertinent Items.
Payment will be made for the type and grade specified. For square yard measurement, a depth will be specified. This price is full compensation for furnishing materials, temporary stockpiling, assistance provided in stockpile sampling and operations to level stockpiles for measurement, loading, hauling, delivery of materials, spreading, blading, mixing, shaping, placing, compacting, reworking, finishing, correcting locations where thickness is deficient, curing, furnishing scales and labor for weighing and measuring, and equipment, labor, tools, and incidentals.
A. END OF SECTION
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 16 23 - 1
CONCRETE SIDEWALKS, CURB, AND DRIVEWAYS
SECTION 32 16 23
CONCRETE SIDEWALKS, CURB, AND DRIVEWAYS
PART 1 GENERAL
1.01 SCOPE
A. This item shall govern for concrete sidewalks and driveways, composed of Portland Cement concrete, constructed as herein specified on an approved subgrade, in conformity to the lines, grades and details shown on the plans or as established by the OWNER.
1.02 SUBMITTALS
A. The Contractor shall submit the following in accordance with the provisions of Section 01 33 23, “Shop Drawings, Product Data and Samples.”
B. A list identifying the types and sources of materials proposed for this work.
1. Laboratory test reports demonstrating compliance with these specifications.
2. Material certificates signed by the material producer and the Contractor certifying that each material item complies with or exceeds specified requirements.
PART 2 PRODUCTS
2.01 CONCRETE
A. All concrete for sidewalks, curb and gutter, and driveways shall conform to Item 300, “Concrete” of the City of San Antonio Standard Specifications for Construction. Concrete shall be Class A unless otherwise specified or indicated on the Drawings and Details.
2.02 REINFORCING STEEL
A. Reinforcing steel shall conform to the City of San Antonio Specification Item 301, “Reinforcing Steel”.
2.03 EXPANSION JOINT MATERIALS
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 16 23 - 2
CONCRETE SIDEWALKS, CURB, AND DRIVEWAYS
A. All expansion joint materials shall conform to the provisions of Item 307.2 E, “Expansion Joint Materials” of City of San Antonio Standard Specifications for Construction.
2.04 MEMBRANE CURING COMPOUND
A. All membrane curing compound shall conform to the provisions of Item 307.2 H, “Curing Materials” of City of San Antonio Standard Specifications for Construction.
PART 3 CONSTRUCTION
3.01 SIDEWALKS, DRIVEWAYS, CURB, AND SIDEWALKS WITH FOOTINGS
A. The subgrade shall be excavated and shaped to the lines, grades and cross section shown on the plans, or as directed by the Owner, and shall be thoroughly compacted. A cushion, 2-inch minimum thickness, of crusher screenings, gravel, crushed rock or flex base material shall be spread, wetted thoroughly, tamped and leveled. The cushion shall be moist at the time the concrete is placed. If the subgrade is undercut, or the natural ground is below "top of subgrade" then necessary backfill shall be made with approved material and compacted with a mechanical tamper. Hand tamping will not be permitted.
B. Where the subgrade is rock or gravel, 70% of which is rock, the 2-inch cushion need not be used. The Owner will determine if the subgrade meets the above requirement. Forms shall be of metal or well-seasoned wood of a section satisfactory to the OWNER; clean, straight, free from warp, and of a depth equal to the thickness of the finished work. All forms shall be securely staked to line and grade maintained in a true position during the depositing of concrete. Before concrete is placed, forms shall be thoroughly oiled with a light form oil.
C. Expansion joint material, 1/2-inch-thick, shall be provided at intervals not to exceed 50 feet and where the new construction abuts the existing curbs or driveways if the Inspector deems it necessary. The expansion joint material shall be placed vertically and shall extend the full depth and width of the concrete.
D. Round smooth dowel bars ½ inch in diameter and 14-inches in length shall be spaced 12-inches apart at each expansion joint. Seven inches of each dowel shall be thoroughly coated with hot oil asphalt or greased, so
that it will not bond to the concrete. Approved types of slip joints may be used in lieu of coating ends of dowels.
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 16 23 - 3
CONCRETE SIDEWALKS, CURB, AND DRIVEWAYS
E. Concrete driveway shall be reinforced as shown on the plans. Reinforcement for driveway No. 4 (1/2") reinforcing steel placed not more than 12 inches on centers both directions. All reinforcement shall be placed equidistant from the top and bottom of the concrete. Care shall be exercised to keep all steel in its proper position during the depositing of concrete. Splices in the No. 4 bars shall have a minimum lap of 30 bar diameters. Concrete driveway pavement shall have a minimum of 6” flexible base material as per Item 32 1116.16 “Flexible Base”.
F. Concrete shall be placed in the forms and spaded, tamped and thoroughly compacted until mortar entirely covers the surface and has a monolithic finish. The top surface shall be floated and troweled to a uniform smooth surface, then finished with a camel hairbrush or wood float to a gritty texture. The outer edges and joints shall be rounded with approved tools to the radii shown on the plans.
G. Immediately after finishing, the surface shall be protected by a membrane curing compound, or by wetted cotton or burlap mats. Either method shall be subject to approval by the Inspector.
H. All necessary excavation for the sidewalk section, will be considered incidental work pertaining to this item, and will not be paid for directly. The adjacent excavation and grading of the slopes shall he done in a manner acceptable to the OWNER.
PART 4 MEASUREMENT AND PAYMENT
4.01 Item 32 16 23.1 Concrete Sidewalks shall be measured by the Square Yard, complete in place, and shall be paid for at the contract unit price bid Square Yard, which shall be full compensation for all excavation, forms, concrete, reinforcement, curing, backfilling, clopping, and for all labor tools, materials, equipment and incidentals necessary to compete the work. 4.02 Item 32 16 23.2 Concrete Curb shall be measured by the Linear Foot, complete in place, and shall be paid for at the contract unit price bid Linear Foot, which shall be full compensation for all excavation, forms, concrete, reinforcement, curing, backfilling, clopping, and for all labor tools, materials, equipment and incidentals necessary to compete the work. 4.03 Item 32 16 23.3 Concrete Curb Ramps shall be measured by the Each, complete in place, and shall be paid for at the contract unit price bid for Each, which shall be full compensation for all excavation, forms, concrete, reinforcement, curing, backfilling, clopping, and for all labor tools, materials, equipment and incidentals necessary to compete the work. 4.04 Item 32 16 23.4 Concrete Driveways shall be measured by the Square Yard, complete in place, and shall be paid for at the contract unit price bid Square Yard, which shall be full compensation for all excavation, forms, concrete, reinforcement, curing, backfilling, clopping, and for all labor tools, materials, equipment and incidentals necessary to compete the work.
Northside ISD – ALE Upgrades at Colby Glass Elementary School (1748-06-01)
RFCSP No. 2021-003 San Antonio, Texas
MAESTAS & ASSOCIATES, LLC 32 16 23 - 4
CONCRETE SIDEWALKS, CURB, AND DRIVEWAYS
4.05 Item 32 16 23.5 Concrete Sidewalk with Footings shall be measured by the Cubic Yard, complete in place, and shall be paid for at the contract unit price bid Cubic Yard, which shall be full compensation for all excavation, forms, concrete, reinforcement, curing, backfilling, clopping, and for all labor tools, materials, equipment and incidentals necessary to compete the work.
END OF SECTION A.
VAN
1)HUCKABEE AND ASSOCIATES, INC. ALONG WITH THEIR
CONSULTANTS HAVE LOCATED, SHOWN , AND NOTED EXISTINGSITE FEATURES INCLUDING BUT NOT LIMITED TO PROPERTYLINES, METES AND BOUNDS, GRADE CONTOURS, EXISTINGSTRUCTURES, EASEMENTS, TREES, FENCES, ROADWAYS,OVERHEAD AND UNDERGROUND UTILITIES, AND OTHEREXISTING FEATURES TO THE BEST OF OUR ABILITY BASEDUPON OWNER PROVIDED SURVEYS, EXISTING CONSTRUCTION
DOCUMENTS AND OTHER EXISTING DATA COLLECTION INREGARDS TO THE SPECIFIED SITE. HUCKABEE ANDASSOCIATES, INC. NOR THEIR CONSULTANTS SHALL ASSUMEANY RESPONSIBILITY OR LIABILITIES IN REGARD TO THEACCURACY OF THE ABOVE MENTIONED OWNER PROVIDEDDATA.2)IF THE CONTRACTOR FINDS ANY DISCREPANCY BETWEENEXISTING CONDITIONS AND THOSE WHICH ARE SHOWN ON THEPLANS, HE SHALL IMMEDIATELY CONTACT THE ARCHITECT.
3)THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH ALLUTILITY ENTITIES TO LOCATE AND MARK ALL UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION.
4)THE CONTRACTOR SHALL VISIT THE SITE AND BECOMEFAMILIAR WITH ALL EXISTING CONDITIONS.
5)FINISH GRADE AT PERIMETER OF THE BUILDING SHALL BE ASSHOWN ON SITE GRADING PLAN. REF. CIVIL DRAWINGS. SITE
GRADES SHALL SLOPE UNIFORMLY AWAY FROM THE BUILDINGAND INTERSECT WITH ELEVATIONS SHOWN.
6)REF. CIVIL DRAWINGS FOR ALL SITE DIMENSIONS
7)MAKE ALL SLOPES OF WALKS AND DRIVES COMPLY WITHFINISH
ELEVATION SHOWN ON CIVIL DRAWINGS. THE LINE OF SLOPE
SHALL FORM STRAIGHT LINES BETWEEN FINISH ELEVATIONSWHEN POSSIBLE AND GRADING CONTOURS WHEN STRAIGHTLINES ARE NOT POSSIBLE. VERIFY ALL ELEVATIONSAND
DIMENSIONS WITH ARCHITECT ON JOB. REF. CIVIL.
8)ALL WALKS AND PLAZAS SHALL BE REINFORCED CONCRETE -REF. CIVIL FOR DETAILS. PROVIDE 1/2" EXPANSION JOINT ASSHOWN BY CIVIL OR AT 25'-0" O.C. MAX. AND AT ALL INSIDECORNERS. PROVIDE TOOLED CONTROL JOINTS AT 5'-0"O.C.B.W. MAX OR AS SHOWN. SEE CIVIL FOR TYPICAL WALKAND JOINT DETAILS.9)PROVIDE 1/2" EXPANSION JOINT ALONG BUILDING FOUNDATION
OR BRICK WHERE CONCRETE WALK IS PRESENT.
10)PROVIDE 1/2" EXPANSION JOINT ALONG BACK OF CONCRETECURB WHERE WALK IS PRESENT. REF. CIVIL DRAWINGS FORCURB DETAILS11)CONTRACTOR SHALL REMOVE ALL EXISTING OBSTRUCTIONS
TO NEW CONSTRUCTION, PAVING, WALKS, AND ALL OTHER SITEIMPROVEMENTS INCLUDING BUT NOT LIMITED TO EXISTINGTREES, FENCES, CONCRETE, ROCKS, DEBRIS, POSTS,VEGETATION, UTILITIES (AS NOTED), AND OTHER ITEMS ASNOTED FOR CONSTRUCTION.
12)REF. ELECTRICAL DRAWINGS FOR OUTDOOR LIGHTING
REQUIREMENTS.13)REF. CIVIL DRAWINGS FOR SITE GRADING PLAN, SITE UTILITYPLAN (INCLUDING FIRE HYDRANT LOCATIONS), EROSIONCONTROL PLANS, AND CURB AND PAVING REQUIREMENTS AND
DETAILS.14)REF. CIVIL SHEETS FOR SITE GRADING CONTOURS.
CONTRACTOR SHALL MAKE ALL CUTS AND FILLS REQUIRED TOACCOMPLISH ALL WORK SHOWN. GRADE SITE TO TOLERANCES
SPECIFIED.15)REF. CIVIL DRAWINGS FOR THICKNESSES AND LOCATIONS OF
ALL TYPES OF PAVING.16)FIRE LANE STRIPING SHALL COMPLY WITH CITY OFSAN ANTONIO
REQUIREMENTS AND NFPA.17) REFER TO SPECIFICATIONS / PROJECT MANUAL FORADDITIONAL INFORMATION AND REQUIREMENTS. 1)OWNER INFORMATIONA. NAME : NORTHSIDE INDEPENDENT SCHOOL DISTRICT
B. ADDRESS: 5900 EVERS RD., SAN ANTONIO, TX 78238
2)PROPERTY INFORMATIONA. NAME: EARL RUDDER MIDDLE SCHOOLB: ADDRESS: 6558 HORN BLVD, SAN ANTONIO, TX 78240
3) LEGAL DESCRIPTIONKITCHEN / CAFETERIA RENOVATIONS
PROPERTY DESCRIPTION
GENERAL SITE NOTES GENERAL SITE NOTES
FEC
FEC
FEC
900
901
902
903
10+0
011
+00
1)HUCKABEE AND ASSOCIATES, INC. ALONG WITH THEIR
CONSULTANTS HAVE LOCATED, SHOWN , AND NOTED EXISTING
SITE FEATURES INCLUDING BUT NOT LIMITED TO PROPERTY LINES, METES AND BOUNDS, GRADE CONTOURS, EXISTING
STRUCTURES, EASEMENTS, TREES, FENCES, ROADWAYS,
OVERHEAD AND UNDERGROUND UTILITIES, AND OTHER EXISTING FEATURES TO THE BEST OF OUR ABILITY BASED
UPON OWNER PROVIDED SURVEYS, EXISTING CONSTRUCTION
DOCUMENTS AND OTHER EXISTING DATA COLLECTION IN
REGARDS TO THE SPECIFIED SITE. HUCKABEE AND ASSOCIATES, INC. NOR THEIR CONSULTANTS SHALL ASSUME
ANY RESPONSIBILITY OR LIABILITIES IN REGARD TO THE
ACCURACY OF THE ABOVE MENTIONED OWNER PROVIDED
DATA. 2)IF THE CONTRACTOR FINDS ANY DISCREPANCY BETWEEN
EXISTING CONDITIONS AND THOSE WHICH ARE SHOWN ON THE
PLANS, HE SHALL IMMEDIATELY CONTACT THE ARCHITECT.
3)THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH ALL
UTILITY ENTITIES TO LOCATE AND MARK ALL UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION.
4)THE CONTRACTOR SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH ALL EXISTING CONDITIONS.
5)FINISH GRADE AT PERIMETER OF THE BUILDING SHALL BE AS
SHOWN ON SITE GRADING PLAN. REF. CIVIL DRAWINGS. SITE
GRADES SHALL SLOPE UNIFORMLY AWAY FROM THE BUILDING
AND INTERSECT WITH ELEVATIONS SHOWN.
6)REF. CIVIL DRAWINGS FOR ALL SITE DIMENSIONS
7)MAKE ALL SLOPES OF WALKS AND DRIVES COMPLY WITH FINISH
ELEVATION SHOWN ON CIVIL DRAWINGS. THE LINE OF SLOPE
SHALL FORM STRAIGHT LINES BETWEEN FINISH ELEVATIONS
WHEN POSSIBLE AND GRADING CONTOURS WHEN STRAIGHT LINES ARE NOT POSSIBLE. VERIFY ALL ELEVATIONS AND
DIMENSIONS WITH ARCHITECT ON JOB. REF. CIVIL.
8)ALL WALKS AND PLAZAS SHALL BE REINFORCED CONCRETE - REF. CIVIL FOR DETAILS. PROVIDE 1/2" EXPANSION JOINT AS
SHOWN BY CIVIL OR AT 25'-0" O.C. MAX. AND AT ALL INSIDE
CORNERS. PROVIDE TOOLED CONTROL JOINTS AT 5'-0"
O.C.B.W. MAX OR AS SHOWN. SEE CIVIL FOR TYPICAL WALK AND JOINT DETAILS.
9)PROVIDE 1/2" EXPANSION JOINT ALONG BUILDING FOUNDATION
OR BRICK WHERE CONCRETE WALK IS PRESENT.
10)PROVIDE 1/2" EXPANSION JOINT ALONG BACK OF CONCRETE
CURB WHERE WALK IS PRESENT. REF. CIVIL DRAWINGS FOR
CURB DETAILS
11)CONTRACTOR SHALL REMOVE ALL EXISTING OBSTRUCTIONS
TO NEW CONSTRUCTION, PAVING, WALKS, AND ALL OTHER SITE
IMPROVEMENTS INCLUDING BUT NOT LIMITED TO EXISTING TREES, FENCES, CONCRETE, ROCKS, DEBRIS, POSTS,
VEGETATION, UTILITIES (AS NOTED), AND OTHER ITEMS AS
NOTED FOR CONSTRUCTION.
12)REF. ELECTRICAL DRAWINGS FOR OUTDOOR LIGHTING
REQUIREMENTS.
13)REF. CIVIL DRAWINGS FOR SITE GRADING PLAN, SITE UTILITY
PLAN (INCLUDING FIRE HYDRANT LOCATIONS), EROSION
CONTROL PLANS, AND CURB AND PAVING REQUIREMENTS AND
DETAILS. 14)REF. CIVIL SHEETS FOR SITE GRADING CONTOURS.
CONTRACTOR SHALL MAKE ALL CUTS AND FILLS REQUIRED TO
ACCOMPLISH ALL WORK SHOWN. GRADE SITE TO TOLERANCES SPECIFIED.
15)REF. CIVIL DRAWINGS FOR THICKNESSES AND LOCATIONS OF
ALL TYPES OF PAVING.
16)FIRE LANE STRIPING SHALL COMPLY WITH CITY OF SAN ANTONIO
REQUIREMENTS AND NFPA.
17) REFER TO SPECIFICATIONS / PROJECT MANUAL FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
1)OWNER INFORMATION
A. NAME : NORTHSIDE INDEPENDENT SCHOOL DISTRICT B. ADDRESS: 5900 EVERS RD., SAN ANTONIO, TX 78238
2)PROPERTY INFORMATION A. NAME: EARL RUDDER MIDDLE SCHOOL B: ADDRESS: 6558 HORN BLVD, SAN ANTONIO, TX 78240
3) LEGAL DESCRIPTION KITCHEN / CAFETERIA RENOVATIONS
PROPERTY DESCRIPTION
GENERAL SITE NOTES
GENERAL SITE NOTES
FEC
FEC
10+00
11+0012+00
12+72BP
: 10+
00.0
0
PI: 1
0+30
.64
PC: 1
0+95
.30
PT: 1
1+53
.46
EP: 1
2+71
.82
900
901
902
903
C1.0Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2019, Huckabee & Associates, Inc.
VV & DSH
2/17/2021
01748-06-01
NORT
HSID
E IN
DEPE
NDEN
T SCH
OOL D
ISTR
ICT
ALE
UPGR
ADES
AT C
OLBY
GLA
SS E
LEME
NTAR
Y SC
HOOL
SAN
ANTO
NIO,
TEXA
S
Revis
ion
/Da
te
8122
DAT
APO
INT
DR.,
STE.
840
SAN
AN
TON
IO, T
X 78
229
(210
) 366
-198
8
TBPE
No.
: F-3
33
TBP
LS N
o.: 1
0194
506
IF THIS BAR DOES NOT MEASURE 1" THENDRAWING IS NOT TO FULL SCALE
DATE02/17/21
SUMMARY OF QUANTITIES(BASE BID):
NOTE:CONTRACTOR TO VERIFY ALL QUANTITIES PROVIDED AND ADJUST AS NEEDED TO PROVIDE A COMPLETE SCOPE OF WORK.
SCALE: 1" = 100'
200'100'50' 0100'SCALE: 1" = 20'
40'20'10' 020'
PROJECT LAYOUT
COLBY GLASS ELEMENTARY SCHOOL OVERALL SITE LAYOUT
REFERENCE SHEET C2.0. FOR SITE DEMOLITION PLANREFERENCE SHEET C3.0 FOR SITE GRADING PLANREFERENCE SHEET C4.0 FOR FIRE SITE PLANREFERENCE SHEET C5.0 FOR WATER LAYOUTREFERENCE SHEET C6.0 FOR PAVEMENT MARKING LAYOUTREFERENCE SHEET C7.0 FOR DRAINAGE AREA MAP
CLEARVIEW DR
ARROWHEA
D DR
PROJECTLOCATION
COLBY GLASSELEMENTARY SCHOOL
INSPIRATION DR
COLBY BASELINE
PROPOSED DRIVEWAY
COLBY GLASS ELEMENTARYSCHOOL
OVERALL SITE CONTROL,GENERAL NOTES,CIVIL QUANTITIES
PROPOSED DRIVEWAY
ALTERNATEBID LIMITS
2
2
22/1
7/202
1AD
DEND
UM 2
VAN
1)HUCKABEE AND ASSOCIATES, INC. ALONG WITH THEIR
CONSULTANTS HAVE LOCATED, SHOWN , AND NOTED EXISTINGSITE FEATURES INCLUDING BUT NOT LIMITED TO PROPERTYLINES, METES AND BOUNDS, GRADE CONTOURS, EXISTINGSTRUCTURES, EASEMENTS, TREES, FENCES, ROADWAYS,OVERHEAD AND UNDERGROUND UTILITIES, AND OTHEREXISTING FEATURES TO THE BEST OF OUR ABILITY BASEDUPON OWNER PROVIDED SURVEYS, EXISTING CONSTRUCTIONDOCUMENTS AND OTHER EXISTING DATA COLLECTION INREGARDS TO THE SPECIFIED SITE. HUCKABEE ANDASSOCIATES, INC. NOR THEIR CONSULTANTS SHALL ASSUME
ANY RESPONSIBILITY OR LIABILITIES IN REGARD TO THEACCURACY OF THE ABOVE MENTIONED OWNER PROVIDED
DATA.2)IF THE CONTRACTOR FINDS ANY DISCREPANCY BETWEENEXISTING CONDITIONS AND THOSE WHICH ARE SHOWN ON THEPLANS, HE SHALL IMMEDIATELY CONTACT THE ARCHITECT.
3)THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH ALLUTILITY ENTITIES TO LOCATE AND MARK ALL UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION.4)THE CONTRACTOR SHALL VISIT THE SITE AND BECOMEFAMILIAR WITH ALL EXISTING CONDITIONS.5)FINISH GRADE AT PERIMETER OF THE BUILDING SHALL BE ASSHOWN ON SITE GRADING PLAN. REF. CIVIL DRAWINGS. SITEGRADES SHALL SLOPE UNIFORMLY AWAY FROM THE BUILDINGAND INTERSECT WITH ELEVATIONS SHOWN.6)REF. CIVIL DRAWINGS FOR ALL SITE DIMENSIONS7)MAKE ALL SLOPES OF WALKS AND DRIVES COMPLY WITHFINISH
ELEVATION SHOWN ON CIVIL DRAWINGS. THE LINE OF SLOPESHALL FORM STRAIGHT LINES BETWEEN FINISH ELEVATIONSWHEN POSSIBLE AND GRADING CONTOURS WHEN STRAIGHTLINES ARE NOT POSSIBLE. VERIFY ALL ELEVATIONSAND
DIMENSIONS WITH ARCHITECT ON JOB. REF. CIVIL.
8)ALL WALKS AND PLAZAS SHALL BE REINFORCED CONCRETE -REF. CIVIL FOR DETAILS. PROVIDE 1/2" EXPANSION JOINT AS
SHOWN BY CIVIL OR AT 25'-0" O.C. MAX. AND AT ALL INSIDE
CORNERS. PROVIDE TOOLED CONTROL JOINTS AT 5'-0"O.C.B.W. MAX OR AS SHOWN. SEE CIVIL FOR TYPICAL WALKAND JOINT DETAILS.9)PROVIDE 1/2" EXPANSION JOINT ALONG BUILDING FOUNDATIONOR BRICK WHERE CONCRETE WALK IS PRESENT.
10)PROVIDE 1/2" EXPANSION JOINT ALONG BACK OF CONCRETECURB WHERE WALK IS PRESENT. REF. CIVIL DRAWINGS FOR
CURB DETAILS11)CONTRACTOR SHALL REMOVE ALL EXISTING OBSTRUCTIONSTO NEW CONSTRUCTION, PAVING, WALKS, AND ALL OTHER SITEIMPROVEMENTS INCLUDING BUT NOT LIMITED TO EXISTINGTREES, FENCES, CONCRETE, ROCKS, DEBRIS, POSTS,VEGETATION, UTILITIES (AS NOTED), AND OTHER ITEMS ASNOTED FOR CONSTRUCTION.12)REF. ELECTRICAL DRAWINGS FOR OUTDOOR LIGHTING
REQUIREMENTS.13)REF. CIVIL DRAWINGS FOR SITE GRADING PLAN, SITE UTILITYPLAN (INCLUDING FIRE HYDRANT LOCATIONS), EROSIONCONTROL PLANS, AND CURB AND PAVING REQUIREMENTS AND
DETAILS.14)REF. CIVIL SHEETS FOR SITE GRADING CONTOURS.CONTRACTOR SHALL MAKE ALL CUTS AND FILLS REQUIRED TOACCOMPLISH ALL WORK SHOWN. GRADE SITE TO TOLERANCES
SPECIFIED.15)REF. CIVIL DRAWINGS FOR THICKNESSES AND LOCATIONS OF
ALL TYPES OF PAVING.16)FIRE LANE STRIPING SHALL COMPLY WITH CITY OFSAN ANTONIOREQUIREMENTS AND NFPA.17) REFER TO SPECIFICATIONS / PROJECT MANUAL FORADDITIONAL INFORMATION AND REQUIREMENTS.
1)OWNER INFORMATIONA. NAME : NORTHSIDE INDEPENDENT SCHOOL DISTRICTB. ADDRESS: 5900 EVERS RD., SAN ANTONIO, TX 78238
2)PROPERTY INFORMATIONA. NAME: EARL RUDDER MIDDLE SCHOOLB: ADDRESS: 6558 HORN BLVD, SAN ANTONIO, TX 78240
3) LEGAL DESCRIPTIONKITCHEN / CAFETERIA RENOVATIONS
PROPERTY DESCRIPTION
GENERAL SITE NOTES GENERAL SITE NOTES
FEC
FEC
FEC
884883
882881
884
883
882
885
886
881
892
891
890
889
888
887
886
885
890
889
888
887
886
885
887
886
884
883
882
880
882
882
883
887
886
885
884
883
883
885
24.0'
24.0'
30.0'
24.0'
57.0'
12.0'
2.0%
8.3%
2.0%
-2.2
%
-2.2
%
-2.5%
-1.1%
-7.4
%
-2.3
%
-2.3
%
-7.8%
-4.6%
-16.5%
-11.6%
-2.7%
-8.2%
-2.2%
-2.2%
-2.1%
-2.1%
-2.3
%
-2.3
%-2.
0%
-2.0%
-2.0%
-2.0%
-2.0%
-2.0%
-3.3%
FEC
FEC
FEC
98 LF OF SIDEWALKHAND RAIL
82 LF OF SIDEWALKHAND RAIL
EXISTING ELECTRICBOARD TO REMAIN
PROP RETAINING WALL
3.6' MAX HEIGHT
COLBY BASELINE
INSTALL NEWLIGHT POLE FOUNDATIONFOR LIGHT ASSEMBLY AND WIRINGSEE ELECTRICAL PLANS
EXISTING FENCETO REMAIN
MATCHING EXISTINGPAVING GRADES
EXISTING GATESTO BE REPLACED
WITH (2) 13' SWINGGATES WITH KNOX
BOX LOCK
GRADING LIMITS
EXISTING FENCE
TO BE REMOVED ANDREPLACED WITH A 6'
TALL CHAIN LINK FENCE
GRADING LIMITS
R=28'
R=28'
PAVEMENT CUT
INSTALL 4 FTSIDEWALK AND CURB
INSTALL ADA RAMPTYPE II
PROP RETAINING WALLSEE LAYOUT ONMISCELLANEOUS SHEETPROP
RETAINING WALL
6 INCH CURB CUT
6" PVC ROOFDRAIN
PROP CONCRETEDRIVEWAY PAVEMENT
REPLACE EXISTINGFENCE WITH NEW
6' CHAIN LINK FENCE
INSTALL NEW 6'CHAIN LINK GATE4' WIDE
REMOVE GATE ANDREPLACE WITH A NEW6' CHAIN LINK GATE4' WIDE
EXTEND 6" PVCSCHEDULE 40TO CURB CUT
INSTALL HAND RAIL
INSTALL HAND RAIL
CONTRACTOR TO PROVIDE BRACINGOF POLE AS NEEDED
INSTALL 69 LF HAND RAIL ONTOP OF RETAINING WALL
NO CURB AROUNDDUMPSTER PAD
SEE ARCHITECTURAL PLANSFOR FENCE AND GATE ENCLOSUREAND GATE FOR DUMPSTER AREA
10+00
11+00
12+00
12+72
BP: 10+00.00
PI: 10+30.64
PC: 10+95.30
PT: 1
1+53
.46
EP: 1
2+71
.82
PLACE CONCRETE BETWEENSIDEWALK AND BACK OF CURB,AS PER CONCRETE SIDEWALK
SPECIFICATIONS
884883
882881
CONTRACTOR PROVIDEMINIMUM GRADING TO MATCH
EXISTING GRADESFOLLOWING ADA STANDARDS
-2.0%
FOR SIDEWALK CONNECTIONENTRY WAY, SEE
SHEET S4.1 DETAIL 9
884
883
882
885
886
881
AREA BETWEEN FENCE ANDDRIVEWAY TO BE FILLED AND
GRADED TO DRAIN
SEE STRUCTURAL PLANSFOR AV DETAILS
REPLACE EXISTING RAILROADTIE AT EDGE OF PLAYGROUND
SURFACE/FENCE
EXISTING RAMPTO REMIAN
BEGIN HAND RAIL
END HAND RAIL
END HANDRAIL
INSTALL 10' GATEHAND RAIL CENTEREDIN FRONT OF ENTRYWAY
CAUTION: OVERHEAD POWER LINECONTRACTOR TO CHECK CLEARANCEAND MAKE ADJUSTMENTS AS NECESSARY
N: 13722157.72E: 2104115.96EL: 882.33
N: 13722265.66E: 2104124.82EL: 883.34
N: 13722129.37E: 2104109.86
EL: 882.02
N: 13722033.04E: 2104048.68
EL: 880.75
N: 13722103.53E: 2104096.70EL: 881.69
N: 13722266.64E: 2104112.86EL: 883.34
N: 13722264.68E: 2104136.78EL: 883.82
N: 13722186.07E: 2104138.55EL: 883.52
N: 13722247.50E: 2104094.09
EL: 883.18
N: 13722248.45E: 2104082.52
EL: 882.71
N: 13722242.47E: 2104082.03
EL: 882.83
N: 13722169.00E: 2104083.58EL: 883.00
N: 13722169.58E: 2104076.04
EL: 882.83
N: 13722175.55E: 2104076.53
EL: 882.95
N: 13722041.43E: 2104037.88
EL: 881.46
N: 13722028.30E: 2104055.80
EL: 880.93
N: 13722221.13E: 2104178.35
EL: 886.72
N: 13722221.82E: 2104179.16EL: 887.30
N: 13722222.73E: 2104180.24
EL: 889.03
N: 13722223.27E: 2104161.47
EL: 885.99
BEGIN RETAINING WALLN: 13722224.26E: 2104161.55
EL: 885.99
N: 13722189.34E: 2104177.50EL: 889.93
N: 13722190.42E: 2104176.58EL: 886.96
END RETAINING WALLN: 13722190.88E: 2104158.81EL: 885.98
N: 13722191.87E: 2104158.89EL: 885.64
N: 13722020.32E: 2104064.94
EL: 881.11
N: 13722007.28E: 2104059.86EL: 881.11
N: 13722010.07E: 2104047.79
EL: 880.34
N: 13722005.90E: 2104045.01
EL: 880.67
N: 13721999.09E: 2104041.54
EL: 880.71
N: 13721998.85E: 2104042.25
EL: 881.29
N: 13722007.43E: 2104051.74
EL: 880.44N: 13722003.27E: 2104048.97EL: 880.77
N: 13721997.59E: 2104046.04EL: 881.37
N: 13721992.51E: 2104040.30
EL: 880.12
N: 13721992.47E: 2104041.04EL: 880.70
N: 13721992.26E: 2104045.04EL: 880.78
N: 13722191.23E: 2104175.90EL: 886.38
N: 13722056.73E: 2104050.05EL: 880.75
N: 13722071.10E: 2104055.24FL ELEV: 880.83
N: 13722141.73E: 2104079.57EL: 882.90
N: 13722165.51E: 2104083.14EL: 883.00
N: 13722118.33E: 2104074.11EL: 882.75
N: 13722095.02E: 2104065.82EL: 882.62
N: 13722050.21E: 2104060.12
EL: 880.98
N: 13722222.52E: 2104161.43EL: 885.41
N: 13722192.62E: 2104158.96
EL: 885.06
N: 13722167.01E: 2104128.76
EL: 882.69
N: 13722252.72E: 2104135.79EL: 883.68
N: 13722156.74E: 2104127.92EL: 882.58
N: 13722126.03E: 2104121.41EL: 882.59
N: 13722097.95E: 2104107.42EL: 881.91
N: 13722111.40E: 2104087.54
EL: 881.51
N: 13722134.00E: 2104098.77
EL: 881.80
N: 13722158.68E: 2104104.00EL: 882.09
N: 13722232.31E: 2104142.35
EL: 884.05
N: 13722173.96E: 2104097.47
EL: 883.75N: 13722167.53E: 2104102.97EL: 883.58
N: 13722167.98E: 2104097.02EL: 883.63
N: 13722270.31E: 2104162.93EL: 889.04
N: 13722264.40E: 2104161.54EL: 889.14
N: 13722271.94E: 2104143.00
EL: 885.43
N: 13722273.58E: 2104123.06
EL: 884.25
N: 13722275.77E: 2104096.41
EL: 882.97N: 13722246.24E: 2104109.43EL: 883.30BEGIN HAND RAIL
N: 13722275.33E: 2104101.67
EL: 883.07
N: 13722246.73E: 2104103.45
EL: 883.36
N: 13722240.75E: 2104102.95EL: 883.48
N: 13722173.47E: 2104103.45EL: 883.63
N: 13722174.97E: 2104084.03
EL: 883.12
N: 13722247.06E: 2104099.36
EL: 883.28
N: 13722240.26E: 2104108.93EL: 883.36
N: 13722232.29E: 2104108.28EL: 883.63
N: 13722232.78E: 2104102.30EL: 883.75
N: 13722241.57E: 2104093.60EL: 883.30
N: 13722241.08E: 2104098.87EL: 883.40
N: 13722039.70E: 2104038.69EL: 880.51
N: 13722011.63E: 2104048.83
EL: 880.40
N: 13722026.38E: 2104058.67
EL: 881.00
N: 13722023.65E: 2104056.85
EL: 880.93
REPLACE EXISTINGFENCE WITH NEW6' CHAIN LINK FENCE
PROPOSED 5'SIDEWALK
MATCH EXISTINGSIDEWALK GRADES
MATCH EXISTINGSIDEWALK GRADES
N: 13722394.31E: 2104184.04EL: 887.33
N: 13722394.66E: 2104189.10EL: 887.34
N: 13722331.51E: 2104177.16EL: 888.13
N: 13722330.33E: 2104182.06EL: 888.14
N: 13722367.32E: 2104182.15
EL: 887.61
N: 13722366.96E: 2104187.16EL: 887.71
N: 13722380.81E: 2104183.09
EL: 887.39
N: 13722380.81E: 2104188.13EL: 887.49
N: 13722349.41E: 2104179.66
EL: 887.87
N: 13722348.65E: 2104184.61EL: 887.97
C3.0
GRADING PLAN
LEGEND
SCALE: 1" = 10'
20'10'5' 010'
PROPOSED 4" SIDEWALK
PROPOSED PAVEMENT PATCH
SCALE: 1" = 150'
300'150'75' 0150'
INSPIRATION DR
ARRO
WHEAD
DR
CLEARVIEW DR
PROJECT GRADING AREA
COLBY GLASSELEMENTARY
SCHOOL
COLBY GLASSELEMENTARY SCHOOLOVERALL SITE LAYOUT
NOTE 1: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND QUANTITIES.
PROPOSEDTURNAROUND
24'
2%
3" HMAC TY D8" FLEXBASE"TXDOT ITEM247 TYPE A,GRADE 1-2"TYPICAL SECTION
N.T.S
TACK COAT
2%
CURB CURBCOLBY_BASELINE
PROPOSED CONCRETE PAVEMENT
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2019, Huckabee & Associates, Inc.
VV & DSH
GRADING PLAN
2/17/2021
01748-06-01
NORT
HSID
E IN
DEPE
NDEN
T SCH
OOL D
ISTR
ICT
ALE
UPGR
ADES
AT C
OLBY
GLA
SS E
LEME
NTAR
Y SC
HOOL
SAN
ANTO
NIO,
TEXA
S
Revis
ion
/Da
te
8122
DAT
APO
INT
DR.,
STE.
840
SAN
AN
TON
IO, T
X 78
229
(210
) 366
-198
8
TBPE
No.
: F-3
33
TBP
LS N
o.: 1
0194
506
IF THIS BAR DOES NOT MEASURE 1" THENDRAWING IS NOT TO FULL SCALE
DATE02/17/21
MATCHLINE A-A
MATCHLINE A-A
NOTE 2: CONTRACTOR TO ENSURE GRADING ALLOWS FOR POSITIVE DRAINAGE AND SHEET FLOW ACROSS THE SIDEWALK.
NOTE 3: CONTRACTOR TO PROTECT ROOT SYSTEM OF THE TREE WITH MINIMAL EXCAVATION AND GRADING. ALIGNMENT ALTERATIONS TO AVOID TREE SHALL BE COORDINATED WITH ENGINEER.
FINISHED FLOORELEV = 883.81
PROPOSED ASPHALT
PROPOSED HAND RAIL
REMOVE AND REPLACEWALKWAY ASPHALT 110.8SY
SEE WALKWAY ASPHALT DETAILON THIS SHEET
PLAYGROUND
BID ALTERNATEREMOVE & REPLACE
WALKWAY ASPHALT 613.4SYLIMITS ARE WITHINTHE ENTIRE AREA
BETWEEN BUILDINGS.SEE WALKWAY ASPHALT DETAIL
ON THIS SHEET
TENSARTX-5GEOGRID
6" COMPACTEDSUBGRADE
WALKWAY ASPHALT DETAILN.T.S
TACK COAT
6" FLEXBASE"TXDOT ITEM 247TYPE A, GRADE 1-2"
1.5" HMAC TY D
PROPERTY LINE
SURFACE SHALLMATCH EXISTINGGRADES
NOTE: ALL AREAS DISTURBED AND FILLED SHALL BE SODDED AFTER FINAL GRADING.
CONCRETE SIDEWALK WITH FOOTINGS
15'
40.1''
26.6'
34.1''
2
2
22/1
7/202
1AD
DEND
UM 2
6" COMPACTEDSUBGRADE
2
2 2
2
2
REQUIREMENTS.SPECIFIED.
GEOGRIDTX-5
VAN
1)HUCKABEE AND ASSOCIATES, INC. ALONG WITH THEIRCONSULTANTS HAVE LOCATED, SHOWN , AND NOTED EXISTINGSITE FEATURES INCLUDING BUT NOT LIMITED TO PROPERTY
LINES, METES AND BOUNDS, GRADE CONTOURS, EXISTING
STRUCTURES, EASEMENTS, TREES, FENCES, ROADWAYS,OVERHEAD AND UNDERGROUND UTILITIES, AND OTHEREXISTING FEATURES TO THE BEST OF OUR ABILITY BASEDUPON OWNER PROVIDED SURVEYS, EXISTING CONSTRUCTIONDOCUMENTS AND OTHER EXISTING DATA COLLECTION INREGARDS TO THE SPECIFIED SITE. HUCKABEE ANDASSOCIATES, INC. NOR THEIR CONSULTANTS SHALL ASSUMEANY RESPONSIBILITY OR LIABILITIES IN REGARD TO THE
ACCURACY OF THE ABOVE MENTIONED OWNER PROVIDED DATA.2)IF THE CONTRACTOR FINDS ANY DISCREPANCY BETWEENEXISTING CONDITIONS AND THOSE WHICH ARE SHOWN ON THEPLANS, HE SHALL IMMEDIATELY CONTACT THE ARCHITECT.
3)THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH ALLUTILITY ENTITIES TO LOCATE AND MARK ALL UNDERGROUNDUTILITIES PRIOR TO CONSTRUCTION.
4)THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS.
5)FINISH GRADE AT PERIMETER OF THE BUILDING SHALL BE ASSHOWN ON SITE GRADING PLAN. REF. CIVIL DRAWINGS. SITEGRADES SHALL SLOPE UNIFORMLY AWAY FROM THE BUILDINGAND INTERSECT WITH ELEVATIONS SHOWN.6)REF. CIVIL DRAWINGS FOR ALL SITE DIMENSIONS
7)MAKE ALL SLOPES OF WALKS AND DRIVES COMPLY WITHFINISH
ELEVATION SHOWN ON CIVIL DRAWINGS. THE LINE OF SLOPESHALL FORM STRAIGHT LINES BETWEEN FINISH ELEVATIONSWHEN POSSIBLE AND GRADING CONTOURS WHEN STRAIGHTLINES ARE NOT POSSIBLE. VERIFY ALL ELEVATIONSAND
DIMENSIONS WITH ARCHITECT ON JOB. REF. CIVIL.
8)ALL WALKS AND PLAZAS SHALL BE REINFORCED CONCRETE -REF. CIVIL FOR DETAILS. PROVIDE 1/2" EXPANSION JOINT ASSHOWN BY CIVIL OR AT 25'-0" O.C. MAX. AND AT ALL INSIDE
CORNERS. PROVIDE TOOLED CONTROL JOINTS AT 5'-0"O.C.B.W. MAX OR AS SHOWN. SEE CIVIL FOR TYPICAL WALKAND JOINT DETAILS.9)PROVIDE 1/2" EXPANSION JOINT ALONG BUILDING FOUNDATIONOR BRICK WHERE CONCRETE WALK IS PRESENT.
10)PROVIDE 1/2" EXPANSION JOINT ALONG BACK OF CONCRETECURB WHERE WALK IS PRESENT. REF. CIVIL DRAWINGS FORCURB DETAILS11)CONTRACTOR SHALL REMOVE ALL EXISTING OBSTRUCTIONSTO NEW CONSTRUCTION, PAVING, WALKS, AND ALL OTHER SITEIMPROVEMENTS INCLUDING BUT NOT LIMITED TO EXISTINGTREES, FENCES, CONCRETE, ROCKS, DEBRIS, POSTS,VEGETATION, UTILITIES (AS NOTED), AND OTHER ITEMS ASNOTED FOR CONSTRUCTION.12)REF. ELECTRICAL DRAWINGS FOR OUTDOOR LIGHTINGREQUIREMENTS.13)REF. CIVIL DRAWINGS FOR SITE GRADING PLAN, SITE UTILITYPLAN (INCLUDING FIRE HYDRANT LOCATIONS), EROSIONCONTROL PLANS, AND CURB AND PAVING REQUIREMENTS AND
DETAILS.14)REF. CIVIL SHEETS FOR SITE GRADING CONTOURS.CONTRACTOR SHALL MAKE ALL CUTS AND FILLS REQUIRED TOACCOMPLISH ALL WORK SHOWN. GRADE SITE TO TOLERANCES
SPECIFIED.15) REF. CIVIL DRAWINGS FOR THICKNESSES AND LOCATIONS OF
ALL TYPES OF PAVING.16)FIRE LANE STRIPING SHALL COMPLY WITH CITY OFSAN ANTONIO
REQUIREMENTS AND NFPA.17) REFER TO SPECIFICATIONS / PROJECT MANUAL FORADDITIONAL INFORMATION AND REQUIREMENTS. 1)OWNER INFORMATIONA. NAME : NORTHSIDE INDEPENDENT SCHOOL DISTRICT
B. ADDRESS: 5900 EVERS RD., SAN ANTONIO, TX 78238
2)PROPERTY INFORMATIONA. NAME: EARL RUDDER MIDDLE SCHOOLB: ADDRESS: 6558 HORN BLVD, SAN ANTONIO, TX 78240
3) LEGAL DESCRIPTIONKITCHEN / CAFETERIA RENOVATIONS PROPERTY DESCRIPTION
GENERAL SITE NOTES GENERAL SITE NOTES
FEC
FEC
FEC
10+00
11+00
12+0
0
12+7
2
BP: 10+00.00
PI: 10+30.64
PC: 10+95.30
PT: 11+53.46
EP: 12+71.823)
THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH ALL
UTILITY ENTITIES TO LOCATE AND MARK ALL UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION.
4)THE CONTRACTOR SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH ALL EXISTING CONDITIONS.
5)
FINISH GRADE AT PERIMETER OF THE BUILDING SHALL BE AS
SHOWN ON SITE GRADING PLAN. REF. CIVIL DRAWINGS. SITE
GRADES SHALL SLOPE UNIFORMLY AWAY FROM THE BUILDING
AND INTERSECT WITH ELEVATIONS SHOWN.
6)REF. CIVIL DRAWINGS FOR ALL SITE DIMENSIONS
7)
MAKE ALL SLOPES OF WALKS AND DRIVES COMPLY WITH
ELEVATION SHOWN ON CIVIL DRAWINGS. THE LINE OF SLOPE
SHALL FORM STRAIGHT LINES BETWEEN FINISH ELEVATIONS
WHEN POSSIBLE AND GRADING CONTOURS WHEN STRAIGHT
LINES ARE NOT POSSIBLE. VERIFY ALL ELEVATIONS
DIMENSIONS WITH ARCHITECT ON JOB. REF. CIVIL.
8)ALL WALKS AND PLAZAS SHALL BE REINFORCED CONCRETE -
REF. CIVIL FOR DETAILS. PROVIDE 1/2" EXPANSION JOINT AS
SHOWN BY CIVIL OR AT 25'-0" O.C. MAX. AND AT ALL INSIDE
CORNERS. PROVIDE TOOLED CONTROL JOINTS AT 5'-0"
O.C.B.W. MAX OR AS SHOWN. SEE CIVIL FOR TYPICAL WALK
AND JOINT DETAILS.
9)PROVIDE 1/2" EXPANSION JOINT ALONG BUILDING FOUNDATION
OR BRICK WHERE CONCRETE WALK IS PRESENT.
10)PROVIDE 1/2" EXPANSION JOINT ALONG BACK OF CONCRETE
CURB WHERE WALK IS PRESENT. REF. CIVIL DRAWINGS FOR
CURB DETAILS
11)CONTRACTOR SHALL REMOVE ALL EXISTING OBSTRUCTIONS
TO NEW CONSTRUCTION, PAVING, WALKS, AND ALL OTHER SITE
IMPROVEMENTS INCLUDING BUT NOT LIMITED TO EXISTING
TREES, FENCES, CONCRETE, ROCKS, DEBRIS, POSTS,
VEGETATION, UTILITIES (AS NOTED), AND OTHER ITEMS AS
NOTED FOR CONSTRUCTION.
12)REF. ELECTRICAL DRAWINGS FOR OUTDOOR LIGHTING
REQUIREMENTS.
13)REF. CIVIL DRAWINGS FOR SITE GRADING PLAN, SITE UTILITY
PLAN (INCLUDING FIRE HYDRANT LOCATIONS), EROSION
CONTROL PLANS, AND CURB AND PAVING REQUIREMENTS AND
DETAILS.14)REF. CIVIL SHEETS FOR SITE GRADING CONTOURS.
CONTRACTOR SHALL MAKE ALL CUTS AND FILLS REQUIRED TO
ACCOMPLISH ALL WORK SHOWN. GRADE SITE TO TOLERANCES
SPECIFIED.
15)REF. CIVIL DRAWINGS FOR THICKNESSES AND LOCATIONS OF
ALL TYPES OF PAVING.
16)FIRE LANE STRIPING SHALL COMPLY WITH CITY OFSAN ANTONIO
REQUIREMENTS AND NFPA.
17) REFER TO SPECIFICATIONS / PROJECT MANUAL FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
GENERAL SITE NOTES
FECFEC
12"W CI
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2019, Huckabee & Associates, Inc.
VV & DSH
2/17/2021
01748-06-01
NORT
HSID
E IN
DEPE
NDEN
T SCH
OOL D
ISTR
ICT
ALE
UPGR
ADES
AT C
OLBY
GLA
SS E
LEME
NTAR
Y SC
HOOL
SAN
ANTO
NIO,
TEXA
S
Revis
ion
/Da
te
8122
DAT
APO
INT
DR.,
STE.
840
SAN
AN
TON
IO, T
X 78
229
(210
) 366
-198
8
TBPE
No.
: F-3
33
TBP
LS N
o.: 1
0194
506
IF THIS BAR DOES NOT MEASURE 1" THENDRAWING IS NOT TO FULL SCALE
DATE02/17/21
SCALE: 1" = 150'
300'150'75' 0150'
INSPIRATION DR
ARRO
WHEAD
DR
CLEARVIEW DR
PROJECT GRADING AREA
COLBY GLASSELEMENTARY
SCHOOL
COLBY GLASSELEMENTARY SCHOOLOVERALL SITE LAYOUT
NOTE:CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND QUANTITIES.
C5.0
SCALE: 1" = 10'
20'10'5' 010'
WATER LAYOUT
INSTALL 65 LF 8" PVC WATER PIPEINSTALL FIRE HYDRANT8" X 6" MJ X ANCHOR TEE6" GATE VALVE, MJ6" VALVE BOX COMPLETE10LF 6" DI PIPE CUT AS REQ'D(SEE SAWS STD. DWG DD-834-01)
INSTALL 1 - 8" GATE VALVE, MJ6" VALVE BOX COMPLETE
INSTALL 50 LF 8" PVC WATER PIPE
INSTALL 35 LF 8" PVC WATER PIPE
INSTALL 50 LF 8" PVC WATER PIPE
INSTALL 30 LF 8" PVC WATER PIPE
INSTALL
30 LF
8" PVC W
ATER PIPE
INST
ALL 1
15 LF
8" PV
C WAT
ER PI
PE
INSTALL 25 LF
6" PVC WATER PIPE
INSTALL 5 LF 8" PVCWATER PIPE1- 8" 132 BEND, M.J.
INSTALL PLUGSEE MECHANICAL
PLANS FORCONNECTION TO
BUILDING
INSTALL1- 8" 116 BEND, M.J.
INSTALL1- 8" 116 BEND, M.J.
INSTALL1- 8" 132 BEND, M.J.
INSTALL 8"X6" TEE1 - 8" GATE VALVE, M.J.6" VALVE BOX COMPLETE1 - 6" GATE VALVE, MJ.6" VALVE BOX COMPLETE
INSTALL PLUG
INSTALL 5'X7.5' VAULTFOR DOUBLECHECK VALVESEE DETAIL DD-824-19ON SHEET C-12
HOT TAP NEW8" PVC TOEXISTING
12" CI PIPE
APPROXIMATE FDCLOCATION
INSTALL 52 LF 8" PVC WATER PIPE
PROTECT WASTE WATER MAINAND INSTALL CONCRETE SADDLE,AS NEEDED
CAUTION: OVERHEAD POWERLINES IN STREET ROW.CHECK CLEARANCES
4" STL GAS
4" EXISTINGSTL GAS
4" EXISTINGSTL GAS
COLBY BASELINE
PROPOSED CURB ANDASPHALT
PROPOSED CURBAND SIDEWALK
PROPOSEDASPHALT
PROPOSED CURB
PROPOSED SIDEWALK
CONTRACTOR SHALLCOORDINATE WITH CPSAND DETERMINE THELOCATION AND DEPTHOF THE GAS MAIN
2
22/1
7/202
1AD
DEND
UM 2
DRIVEWAY SECTION LIMITSAS SHOWN ON PLANS
CURB & SIDEWALKBEYOND
6" CONCRETE
0 -14%MAX.
2%MAX.1/2"
#4 BARS 12" O.C. BOTH WAYS
6" FLEXIBLE BASE
LOW CURB
(ITEM 301)
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2019, Huckabee & Associates, Inc.
VV & DSH
2/17/2021
01748-06-01
NORT
HSID
E IN
DEPE
NDEN
T SCH
OOL D
ISTR
ICT
ALE
UPGR
ADES
AT C
OLBY
GLA
SS E
LEME
NTAR
Y SC
HOOL
SAN
ANTO
NIO,
TEXA
S
Revis
ion
/Da
te
8122
DAT
APO
INT
DR.,
STE.
840
SAN
AN
TON
IO, T
X 78
229
(210
) 366
-198
8
TBPE
No.
: F-3
33
TBP
LS N
o.: 1
0194
506
IF THIS BAR DOES NOT MEASURE 1" THENDRAWING IS NOT TO FULL SCALE
DATE02/17/21
C8.0
MISCELLANEOUS CIVILDETAILS SHEET 1
6" x 6" W / D 2.9 x W / D 2.9 WELDEDWIRE FLAT SHEETS (ITEM 303) OR#3 BARS @ 18" O.C. EACH WAYCENTERED IN SLAB (ITEM 301)
4" CLASS "A" CONCRETE
2" MINIMUM GRAVEL, CRUSHED ROCKOR FLEXIBLE BASE MATERIAL
CONCRETE SIDEWALK SECTIONITEM 502N.T.S.
2% MAX. SLOPE TO CURB
2
LIGHT POST FOUNDATIONDETAILN.T.S.
1
ANCHOR BOLTPROJECTION 4"
FORM WITH24" SONOTUBE
FINISHED GRADEASPHALT SURFACE
3/4" X 10' GROUNDROD WITH CADWELD
CONNECTION
#8 BARE COPPERGROUND WIRE CONTINUOUS
PVC CONDUIT, CONCEAL ALLWIRING IN POLE AND TROUGHS
STEEL SHALL MAINTAIN3" MINIMUM OF CONCRETECOVERAGE THROUGHOUTFOUNDATION
EIGHT NO. 4 STEELREINFORCING RODS
NO. 4 STEEL REINFORCINGTIES ON 12" CENTERS
HAND RUB CONCRETE BASETO REMOVE IRREGULARITIESTO PROVIDE SMOOTH FINISH,PAINT EXPOSED AREASAFETY YELLOW
2" CHAMFERED EDGES
ANCHOR BOLTS BY LIGHTMANUFACTURER MINIMUM 3'-0"LONG PROVIDE BOTTOM NUTFOR LEVELING AND DOUBLENUTS ON TOP BASE COVER
24"
36"
10'-0"
STANDARD SIDEWALKCONCRETE DETAIL
CURB
12" EXPANSIONJOINT MATERIAL
12" EXPANSIONJOINT MATERIAL
2' TOE WALL 2' TOE WALL
5" THICK3000 PSI CLASS CCONCRETE
2% MAX
6' SIDEWALK
BUILDING
FINISHED FLOOR
SIDEWALK SECTION AT THE BUILDINGN.T.S.4
#4 BARS @ 12" O.C.
PROPOSED RETAINING WALL LAYOUTN.T.S.3
NOTE: REFER TO TXDOT STANDARD FOR RETAINING WALLS
889.93
885.98
885.06886.38886.72
889.03
885.41
885.99
18.25' 32.5' 18.25'
DRIVEWAY
#4 BARS @ 12" O.C.
AREA = 95.22 SQFT
AREA = 26.37 SQFT AREA = 40.79 SQFT
HEIGHT VARIES
COMPACTEDSUBGRADE
6" 6"
FLOOR BEAM
CONTRACTOR SHOULDENSURE SUBGRADE IS
COMPACTED BELOWFOOTING
TYPICAL COMMERCIAL DRIVEWAY SECTIONN.T.S.5
WITH SIDEWALK ABUTTING CURBITEM 503.2
2
22/1
7/202
1AD
DEND
UM 2
TYPICAL SECTION REINFORCED CONCRETE DRIVEWAY
PAVEMENT
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2019, Huckabee & Associates, Inc.
VV & DSH
2/17/2021
01748-06-01
NORT
HSID
E IN
DEPE
NDEN
T SCH
OOL D
ISTR
ICT
ALE
UPGR
ADES
AT C
OLBY
GLA
SS E
LEME
NTAR
Y SC
HOOL
SAN
ANTO
NIO,
TEXA
S
Revis
ion
/Da
te
8122
DAT
APO
INT
DR.,
STE.
840
SAN
AN
TON
IO, T
X 78
229
(210
) 366
-198
8
TBPE
No.
: F-3
33
TBP
LS N
o.: 1
0194
506
IF THIS BAR DOES NOT MEASURE 1" THENDRAWING IS NOT TO FULL SCALE
DATE02/17/21
C12.0
MISCELLANEOUS SAWSDETAILS SHEET 1
c. See Commercial Driveway section on Miscellaneous Civil Details Sheet for the concrete driveway details.
NOTE: FOR ALL SAN ANTONIO WATER SYSTEM DETAILS, CHECK FOR UPDATES TO STANDARDS.
2
12/4
/2021
ADDE
NDUM
12
2/17/2
021
ADDE
NDUM
2
1
1
c. Concrete sections shall conform to detail on SheetC8.0.
Project Name & Number: ALE Upgrades at Colby Glass Elementary School 1748-06-01 Northside ISD San Antonio, Texas
Architectural Items For Addendum No. 1
Page 1 of 1
MECH-ELEC-PLBG ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED: PROJECT MANUAL: AD No 2, MEP. Item 1: To the Project Manual, Section 23 0700 (HVAC INSULATION).
1. Part 3 Execution: ADD Par. 3.1.E. Prime ALL indicated Mechanical Room chilled water piping, fittings, unions, flanges, fittings, nuts, bolts/threads, etc. with rust-colored steel pipe primer (Rustoleum, or approved equal).
2. Part 3 Execution: Par. 3.13, Piping Insulation Table: CHANGE interior chilled water pipe insulation from Type “B” to Type “A”.
3. Part 3 Execution: ADD Par. 3.14. Duct Insulation: A. Supply AND Return Air Duct Internal Duct Liner: Acoustical rated, 1in. tk., supply and return duct, glued
full contact, to 12ft from connection to respective AHU. B. ALL Supply Air Duct: Min. 1-1/2lb, R-6, foil-faced, organic fiberglass batte, factory-applied FRM-25
vapor barrier, 3in. laps, 3in. glass mesh fabric/mastic, stainless steel staples, 100% vapor sealed. C. Supply Air AND Outside Air Duct Insulation In Mechanical Room: Owens-Corning, Rigid Board Type
800FR, 1-1/2in thick, min. 3.8lb. density, with reinforced aluminum facing, glued, full contact. DRAWINGS: AD No 2, MEP. Item 1: To the Drawings, Sheet E2.1, New Work Floor Plan Lighting
1. Room H119B, Existing Toilet: Change light fixture from "A" to "B". 2. Room H110B, Existing Toilet: Change light fixture from "A" to "B". 3. Room H110A, New Closet: Change light fixture from "A" to "B". 4. Room H108, Electrical Closet: Replace existing pendant light fixture (not indicated) with a new "K" fixture. 5. Classroom Lighting Control Schematic: Delete line 2. 6. Rooms H109B & H111C, New Toilet Rooms: Apply keyed note 1 to these 2 rooms. 7. Corridor Light Switches: Change applied keyed note 7 (applied in 2 places) to keyed note 9. 8. Keyed Note 9: Changed to require REPLACEMENT of existing light switch/plate. 9. Keyed Notes 10 & 17: Change notes to read, "NOT USED". 10. Existing Toilet Rooms H106, H107, H113 & H115: Apply keyed note 36 to light fixtures in these rooms.
END OF MEP ADDENDUM
2
11.2
12
11.1
13
H I J KJ.2
XF
CRP
CR
HCR
480/277
225A
SS
S
J
J
J
J
JJ
J
J
J
J
J
SS
S
J
A
B
L1
J
J J
S
J
S
J
S
J
S
J
S
J
S
J
S
J
S
J
F
F
F
F
F
F
F
F
F
F
F
AVAV
AVAV
AV
AVAV
AV
AV
AV
AV
AV
SS
S
S
S
S
S
S
S
SS
S
S
S
S
S
1) ALL 'A'
FIXTURES
2) AV
FIXTURE
ONLY
PP PP
PP
F
E
E
E
E G
G
F
G
PANEL HCR
277V
D
D
D
D
D
SS
S
PP
PP
PP
PP
PP
(10FT)
T
S
T
S S
H
H
90"
90"
S
PP
PP
PP
3
3
PP
23F
T (+
/- 12IN
)
EXISTING
POLE TO BE REMOVED
(SEE SHEET C2.0)
NEW
POLE TO BE SET
(SEE SHEET C8.0)
MK. 'EXA'
NEW POLE LOC'N IS
MAX. 50FT. FROM
REMOVED POLE
NEW WORK: EXTERIOR LIGHT POLE
J
1
2
PPPP
J
EXIST.
277V
ONE (1) AV LIGHT
FIXTURE PER
CLASSROOM
(KEYED NOTE 13)
ALL OTHER
CLASSROOM
LIGHT FIXTURES
ZONE
1
ZONE
2
GENERAL NOTES, CLASSROOM LIGHTING CONTROL
1. PROVIDE LOW VOLTAGE, 2-ZONE, CLASSROOM LIGHTING CONTROL SYSTEM, ACUITYBRANDS
MANUFACTURE, N-LIGHT SERIES (OR NORTHSIDE ISD APPROVED EQUAL), WITH OCCUPANCY
SENSORS AND POWER PACKS.
2. CONTRACTOR OPTION: HARD-WIRED, LINE-VOLTAGE (277V), 2-ZONE CONTROL.
3. SEQUENCE OF OPERATION:
A. IF SPACE UNOCCUPIED (AFTER A 30 SECOND, ADJUSTABLE TIME DELAY) , ALL LIGHTS
OFF.
B. IF OCCUPANCY IS SENSED AND A WALL SWITCH (ZONE 1 OR 2) IS ACTIVATED,SELECTED
ZONE LIGHTING WILL BE ACTIVATED.
ON/OFF
CAT V CABLING
TO POWER PACKS
CLASSROOM LIGHTING
CONTROL SCHEMATIC
L L
LL
FLOOR PLAN NEW WORK KEYED NOTES:
WITH THE EXCEPTION OF INDICATED 2X4, LAY-IN LIGHT FIXTURES, RE-INSTALL ALL
CEILING FIXTURES (OCCUPANCY SENSOR, FIRE ALARM LIGHT, EMERGENCY LIGHT,
FAN) AND CONNECT FOR OPERATION, SAME AS BEFORE DEMOLITION. LIGHT
FIXTURES SHALL BE REPLACED WITH NEW AS INDICATED AND SCHEDULED.
PROVIDE NEW LOW VOLTAGE, 2-CHANNEL (2 ZONE), LIGHTING CONTROL SYSTEM.
INTERCEPT LIGHT SWITCH CONDUIT AT WALL ABOVE CEILING/SWITCH WITH A NEW
4-SQUARE J-BOX (WITH EXTENSION RING) FOR CONNECTION TO THE LIGHTING
CONTROL 'POWER PACKS'. CONNECT EXISTING 277V LIGHTING CIRCUIT (IN THE
INDICATED J-BOX) TO POWER PACK(S). PROVIDE NEW LOW-VOLTAGE CABLING
BETWEEN SWITCH, POWER PACK(S) AND CEILING OCCUPANCY SENSOR(S) FOR
2-CIRCUIT AUTO-CONTROL OF CLASSROOM LIGHTING AS FOLLOWS:
ZONE 1 = ALL LIGHT FIXTURES
ZONE 2 = 'AV' FIXTURE ONLY (KEYED NOTE 13).
EXISTING 277V LIGHTING J-BOX TO REMAIN FOR CONNECTION TO POWER PACKS.
SEE ROOM H116 (TYPICAL FOR ALL CLASSROOM LIGHTING CONTROL).
REPLACE EXISTING EMERGENCY LIGHT FIXTURE WITH NEW, AS SCHEDULED.
CONNECT TO UN-SWITCHED PORTION OF THE LIGHTING CIRCUIT SERVING
REPLACED FIXTURE.
REPLACE LIGHT IN THIS ROOM WITH NEW, AS SCHEDULED, AND CONNECT TO
EXISTING DOOR SWITCH FOR OPERATION, SAME AS BEFORE REPLACEMENT.
NIGHT LIGHT: CONNECT THIS FIXTURE TO THE UNSWITCHED PORTION OF THE
EXISTING LIGHT FIXTURE CIRCUIT FOR CONTINUOUS 24/7 OPERATION.
NEW SURFACE MOUNTED UNDERFLOOR LIGHT SWITCH. SEE UNDERFLOOR
LIGHTING PLAN AND KEYED NOTE 26.
EXTEND/CONNECT EXISTING 277V SWITCHED CORRIDOR LIGHT CIRCUIT TO THIS
LIGHT FIXTURE.
REPLACE EXISTING LIGHT SWITCHES AND PLATES. CONNECT TO NEW LIGHT
FIXTURES FOR OPERATION, SAME AS BEFORE DEMOLITION.
NOT USED.
PENDANT MOUNT FIXTURES IN THIS ROOM TO APPROXIMATELY 10FT. AFF.
COORDINATE WITH OVERHEAD DUCTWORK AND PIPING (SEE ENLARGED
MECHANICAL ROOM PLAN 3/M1.1).
PROVIDE NEW LIGHT SWITCH. CONNECT TO EXISTING CIRCUIT SERVING REMOVED
CLOSET LIGHT FIXTURE.
CONNECT THIS LIGHT FIXTURE TO OPERATE FOR ZONE 1 AND ZONE 2 LIGHT
SWITCH ACTIVATION. ALL OTHER LIGHT FIXTURES ACTIVATE ZONE 1 ONLY.
EXTEND/CONNECT TO CIRCUIT SERVING REMOVED LIGHT FIXTURES. NOTE CIRCUIT
(HCR/XX) ON RECORD DRAWINGS.
REINSTALL SPRING-LOADED TOGGLE SWITCH/FACEPLATE, REMOVED DURING
DEMOLITION.
PROVIDE NEW LOW VOLTAGE LIGHT SWITCH, SURFACE MOUNTED ON EXISTING
CMU BLOCK WALL CONSTRUCTION, ROUTE SURFACE MOUNTED RACEWAY TO
J-BOX APPROXIMATELY 18IN. ABOVE CEILING.
NOT USED.
REMOVE POLE/FIXTURE (OWNER TO ASSIST IN LOCATING SOURCE BREAKER). REF.
SHEET C2.0 FOR POLE LOCATION.
EXISTING BASE TO BE REMOVED BY OTHERS.
DIG/INTERCEPT CONDUITS FEEDING IN/OUT OF THIS POLE TO BE REMOVED.
REMOVE MAX. 300 LF OF 2#8 AND 1#10 G. IN 1IN. CONDUIT TO POLE ON CLEARVIEW
DRIVE FOR REPLACEMENT WITH NEW.
EXTEND NEW 1IN. CONDUIT MAX 50FT. TO NEW POLE LOCATION (REF. SHEET C3.0
FOR BOTH NEW AND REMOVED POLE LOCATIONS).
PULL MAX. 300 LF OF 2#8 AND 1#10 G. IN EXISTING 1IN. UNDERGROUND CONDUIT.
RE-CONNECT TO EXISTING LIGHT POLE (ON CLEARVIEW), SAME AS BEFORE
REMOVAL.
CONCRETE BASE BY OTHERS (REF. DETAIL 1/C8.0).
MOUNT POLE ATOP CONCRETE BASE (TOP OF BASE = 3FT. ABOVE FINISHED
GRADE), PER DETAIL 1/C8.0. CONNECT FOR SWITCHED OPERATION, SAME AS THE
REMOVED POLE BEFORE START OF WORK.
PROVIDE 277V RATED LIGHT SWITCH (WITH PILOT LIGHT) SURFACE MOUNTED IN
CUSTODIAL CLOSET, 48IN. AFF. CONNECT FOR ON/OFF OPERATION OF ALL
INDICATED UNDER-FLOOR LIGHT FIXTURES.
CONNECT UNDERFLOOR LIGHT SWITCH (277V POWER LEG) TO CIRCUIT SERVING
THE CUSTODIAL CLOSET.
MOUNT LIGHT FIXTURE BETWEEN CONCRETE JOISTS (JOISTS ARE 3FT. ON
CENTER), PENDANT MOUNT LIGHT FIXTURES FROM GALVANIZED THREADED RODS
AND UNISTRUT, SPANNED BETWEEN THE CENTER OF ADJACENT CONCRETE PAN
JOISTS (USE L-CLIPS, 3/8IN X 2IN. EXPANSION ANCHORS). SET TOP OF LIGHT
FIXTURE FLUSH WITH BOTTOM OF CONCRETE JOISTS (FOR MAXIMUM
FOOT-CANDLE SIDE-DISTRIBUTION).
PROVIDE ALL UNDER-FLOOR CONDUIT GREY PVC (EXCEPT ALL ELBOWS TO BE IMC),
MAX 18IN. SEAL-TITE, GALVANIZED (OR OTHER CORROSION RESISTANT) CONDUIT
SUPPORTS. FASTENED (IN A VERY STRAIGHT LINE)TO UNDERSIDE OF CONCRETE
BEAMS, 3FT. O.C. USING 2-HOLE STRAP.
ON/OFF LIGHT SWITCH (2-ZONES, LOW VOLTAGE, SINGLE-GANG, VERTICAL BOX).
EXISTING (RECESSED LIGHT SWITCH BOX FOR ALL CLASSROOMS EXCEPT H109
AND H111, WHICH SHALL BE NEW, SURFACE MOUNTED BOXES/RACEWAY.
EXISTING CONDUIT IN WALL (EXCEPT NEW SURFACE RACEWAY FOR H109 AND
H111).
NEW J-BOX (WITH EXTENSION RING) AT WALL ABOVE LIGHT SWITCH (REF. KEYED
NOTE 2 ABOVE).
EXISTING J-BOX ABOVE CEILING (A 'HUB') WITH UN-SWITCHED 277V CIRCUIT (REF.
KEYED NOTE 3 ABOVE).
CEILING DUAL-MODE OCCUPANCY SENSOR (ULTRA-SONIC + INFRARED). TWO (2)
PER CLASSROOM.
PLENUM RATED, CAT V (OR CAT VI) CABLE, SUPPORTED IN ACCORDANCE WITH
DIVISION 27 CABLE-SUPPORTING REQUIREMENTS.
SET NEW FIXTURES IN NEW 8'-6" GYPBOARD CEILING. CONNECT FOR ON/OFF
OPERATION IN PARALLEL WITH THE INDICATED/ADJACENT LIGHT FIXTURE.
GENERAL NOTES, NEW WORK LIGHTING PLAN:
1. EMERGENCY FIXTURES (E, F, G, EX : CONNECT ALL INDICATED EMERGENCY LIGHT
FIXTURES (MARK 'E', 'F', 'G' AND 'EXF') TO THE UN-SWITCHED PORTION OF THE
AREA SERVED (EXCEPT 'G', WHICH SHALL BE CONNECTED TO THE UN-SWITCHED
PORTION OF THE CORRIDOR LIGHT CIRCUIT).\
2. EMERGENCY LIGHTS: EXCEPT FOR EXISTING/RE-INSTALLED CEILING MOUNTED
EMERGENCY LIGHT LIGHT FIXTURES (TOILET ROOMS H109B, 110B, 111C, H116B,
H117B, H118B AND H119B) AND WHERE OTHERWISE NOTED (FOR MECHANICAL
ROOM EMERGENCY LIGHT) INSTALL ALL INDICATED EMERGENCY LIGHT FIXTURES
HIGH AGAINST THE UNDERSIDE OF THE LAY-IN CEILING.
3. PROVIDE NEW AND (WHERE SPECIFICALLY INDICATED) RE-INSTALL EXISTING
FIXTURES, AS INDICATED AND SCHEDULED ON THIS FLOOR PLAN.
4. NEW LIGHT SWITCHES: INDICATED NEW WALL LIGHT SWITCHES SHALL BE
INSTALLED (TOP OF SWITCH) 48IN. ABOVE FINISHED FLOOR AND PROVIDED WITH
BRUSHED STAINLESS STEEL FACEPLATES.
5. RE-USE EXISTING LIGHT CIRCUITS : UNLESS OTHERWISE NOTED, CONNECT NEW
277V LIGHT FIXTURES TO CIRCUITS SERVING REMOVED FIXTURES.
S
J
J
J
J
J
J
J
LIGHTING FIXTURE SCHEDULE (See note 4)
1/16" = 1'-0"NEW WORK UNDERFLOOR PLAN; LIGHTING
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2020, Huckabee & Associates, Inc.
Revis
ion
/Da
te
8815 Shade Tree
San Antonio, TX 78254
210.844.4532
PLAN
NORTH
TRUE
NORTH
1/8" = 1'-0"NEW WORK PLAN; LIGHTING (INTERIOR AND EXTERIOR)
PLAN
NORTH
TRUE
NORTH
2
22/19/2021
2
2
2
2
2
2
2
Ad
den
du
m # 2