© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 2
Three main activities in four sectors
Equipment & services for power generation
Equipment & services for rail transport
Equipment & services for power transmission
Alstom Thermal Power Alstom Grid
Alstom Renewable Power Alstom Transport
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 3
Alstom Renewable PowerTechnologies adapted to all renewable energy sources
HYDRO WIND
GEOTHERMALSOLAR THERMAL
INDUSTRIAL STEAM TURBINES
BIOMASS
OCEAN
…for new plants and the installed base
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 4
Alstom, the leading supplier in hydropowerfor over 100 years
A global leader
• from water to wire
• for new plants
& the installed base
• for service & retrofit
Alstom accounts for over 25% of world’s hydro power plants
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 5
PlantIntegrator™
The broadest hydropower portfolio
TURBINE
GENERATOR HYDRO MECHANICAL
SERVICE & RETROFIT
GRID SOLUTIONS
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
CONTROL SYSTEM
BALANCE OF PLANT
Turnkey plant or individual products
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 6
Turbines and Generators
Bulb Kaplan Francis Pump Turbine Pelton
Low Speed Low Speed Medium Speed MotorGenerator High Speed
Product Portfolio Hydro Business
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 7
A reliable large-scale storage solution:Pumped Hydro Storage Plants (PSPs)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 8
PSP in Europe
199 plants,
48,8 GW turbine capacity
537 machines with
a pumping mode (representing
a turbine capacity of 46,6 GW)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 9
Alstom ongoing PSP Projects Worldwide
SWITZERLAND
NANT DE DRANCE
6 units of 150 MWVariable Speed 305 m – 428.6 rpm
LINTH-LIMMERN
4 units of 250 MWVariable Speed 613 m – 500 rpm
PORTUGAL
ALQUEVA II
2 units of 130 MW
72 m – 428.6 rpm
SALAMONDE II
1 unit of 209 MW
115 m – 166,7 rpmINDIA
TEHRI
4 units of 250 MWVariable speed
188 m - 233 rpm
ZHANGHEWAN
4 units of 255 MW
305 m – 333.3 rpm
HOHHOT
4 units of 306 MW
521 m - 500 rpm
PUSHIHE
4 units of 306MW
308m–333.3 rpm
CHINA
ISRAEL
GILBOA
2 units of 150 MW
430 m - 750 rpm
Equipment + O&M
FRANCE
REVIN
4 units of 200 MW
Rehabilitation
240 m – 300 rpm
LE CHEYLAS
1 units of 256 MW
Upgrade to variable
speed
254 m – 300 rpm
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 10- - P 10
What PSP Does
Provide flexibility to balance base load generation
Complement intermittent renewable energies
Optimise electrical grids
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 11
Thermal & Nuclear plants optimisation
Time
Power(GW)
242322212019181716151413121110987654321
Adjustable GenerationPSP, Gas turbine, Hydro
PSP Pumping
Consumption
Base Load GenerationNuclear, Coal, Run of the river hydro, …
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 12
Baseload (non flexible)
Wind energy
Demand
Flexible Generation
Excess windPo
we
r
Time
1min
GWRegulation
Actual Generation
Forecast
1h
Ramp RateGW
Intermittent
Balancing
load
Generation
24h
GW Time Shift
New need for flexibility
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 13
Increase of unit cycling
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 14
0
1200000
2400000
3600000
4800000
6000000
7200000
8400000
9600000
10800000
12000000
Unit 1 2005-2007
2006
Increased partial load operation
0
2400000
4800000
7200000
9600000
12000000
14400000
16800000
19200000
21600000
24000000Unit 1 2008-2010
2009
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 15
PSP Development Trends
Performance improvement• Efficiency: 70 to 80% in 40 y.
• Availability, Reliability, Cycling
Overcoming topological limitation• Very High or Very Low Head
• Head range increase
• Underground reservoir
• Sea water operation
Maximising flexibility• Variable Speed offering
• Power range increase
• Reaction time reduction
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 16
Variable speed PSP
Double Fed Asynchronous Motor Generator
• Adjustable pumping power
• Compatible with larger head variation
• Faster power adjustment
• Pump Turbine global efficiency (+ ~ 1%)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 20/11/2014 – P 17
PSP allows Renewable to remain Renewable
Customised solutions for each application
Economical feasibility highly depends on
regulatory framework