OMV Group – facts & figures - International Gas Union
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of OMV Group – facts & figures - International Gas Union
2 |OMV Gas, Storage, Michael Kreuz, April 2007
OMV – Gas Vienna - Austria
Michael Kreuz, Head of Storage department
function:
in charge of selling storage capacity
in charge of managing demands and facility availability
3 |OMV Gas, Storage, Michael Kreuz, April 2007
OMV Aktiengesellschaft
Leader in Central and Southeastern Europe for oil and gas
Group sales of EUR 19 billion (US$ 25.5 billion)
Market capitalization of approx. EUR 13 billion (US$ 17.4 billion)
41,000 staff in 27 countries
5 |OMV Gas, Storage, Michael Kreuz, April 2007
ÖIAG31.5%
Free f loat50.9%
IPIC/Abu Dhabi 17.6%
Stockholder structure
Austria 20.0% UK 10.0% USA 9.0% Rest of Europe 8.0% Rest of world 3.9%
6 |OMV Gas, Storage, Michael Kreuz, April 2007
Business segments of the OMV Group
Exploration and Production
Gas Refining and Marketing
7 |OMV Gas, Storage, Michael Kreuz, April 2007
OMV Gas
Key figures 2006 in bcm (Bcf)
Russia 5.9 (208.4) Norway 1.3 (45.9) Others 1.9 (67.1) OMV/Petrom Prod. 5.4(190.7) Total 14.5 (512.1)
Supply
OMV Gas International 1.4 (49.4) EconGas 7.7 (272) Petrom 5 (176.6) Total 14.1 (498)
Sales
Working gas volume 2,120
Storage
Sold transmission volume: North-South-System 32.8 (1,158.5) East-West-System 14.1 (498) Total 46.9 (1,656.5)
Transport Working gas volume 2.1 (74.2) Capacity 1.2 mcm/h (42.4 Mcf/h)
Storage
Title Transfer 7.7 (272)
CEGH
8 |OMV Gas, Storage, Michael Kreuz, April 2007
Storage fields
UGS Depth
(m)
Pressur
e (bar)
Number
of wells
Working
gas
(mm³)
Rate
(1000
m³/h)
Schönkirchen/
Reyersdorf 500 – 1,400 max. 120 124 1,570 770
Tallesbrunn 750 max. 75 24 300 160
Thann 650 max. 60 17 250 130
Puchkirchen 1,100 max. 115 6 700 290
Total - - 171 2,820 1,350
9 |OMV Gas, Storage, Michael Kreuz, April 2007
Supply Issues
With respect to present –> 2009 we are sold out
this leads the company to look for additional opportunities to
increase the capacity
10 |OMV Gas, Storage, Michael Kreuz, April 2007
Storage Developments
Planned – Schönkirchen/Reyersdorf using existing UGS
currently negotiating with contractor for the drilling work
additional capacities on this UGS expected to be operational in Dec. 2007
Preparation to obtain relevant certificates to increase pressure in our current storages
expected to be operational in early 2009
Planned – “Schönkirchen Tief” currently object of feasibility study
expected results June 2007
could be operational May 2011
11 |OMV Gas, Storage, Michael Kreuz, April 2007
Project: UGS Schönkirchen Tief
2,800 m depth
Feasibility study
1-2 bcm working gas volume
excellent deliverability expected (100,000 cm/h/well)
development in steps according to demand
12 |OMV Gas, Storage, Michael Kreuz, April 2007
Austrian Storage Market Today
Mining Law - Administered by national mining authorities who issue
EIA’s (Environmental Impact Assessments)
Permits on the engineering and technical drafts of the projects
GGPSSO principles
TPA: negotiated
Transparency: Published conditions on the web
Unbundled Services
available on a yearly, monthly, weekly and daily basis
Combination of modules: custom-made contracts
Non-discriminating: contracts to be presented to E-Control (Austrian Regulator)
13 |OMV Gas, Storage, Michael Kreuz, April 2007
Project: Nabucco Gas Pipeline
New gas transmission possibility
Pipeline Diameter: 56“
Distance: 3,300 km
Investment: ~ 5 bill. €
Transport capacity: max. 31 bcmy
VIENNA
BUCHAREST
SOFIA
ANKARA
ISTANBUL
BUDAPEST
Pipeline Diameter: 56“
Distance: 3,300 km
Investment: ~ 5 bill. €
Transport capacity: max. 31 bcm/y