Nanded District Swachhata Plan - swachh sangraha

111
Nanded District Swachhata Plan Strategy and plan to make Nanded district ODF by March 2018

Transcript of Nanded District Swachhata Plan - swachh sangraha

0

Nanded District Swachhata Plan

Strategy and plan to make Nanded district ODF by March 2018

Nanded District Swachhata Plan 1

PriMove Pune UNICEF Mumbai

CONTENTS

1. Introduction .................................................................................................................................. 2

1.0 State and District Vision ................................................................................................................ 2

2. Enabling Factors and Bottlenecks ................................................................................... 6

3. The Strategy .................................................................................................................... 7

4. Strategic actions and activity plan .................................................................................. 8

4.1 Demand Management .................................................................................................................. 8

4.2 Demand Response Mechanism ................................................................................................... 17

4.3 Oversight and Monitoring ........................................................................................................... 23

4.4 Sustainability Plan ....................................................................................................................... 25

Institutional arrangements for implementation of the strategy ...................................................... 25

NON-NEGOTIABLES FOR THE STRATEGY ........................................................................................... 27

Activity Plan ...................................................................................................................................... 28

Financial Plan .................................................................................................................................... 34

5. Annexure ....................................................................................................................... 35

Annexure 1 List of Master Trainers and Motivators ......................................................................... 36

Annexure 2 GP wise status of Sanitation .......................................................................................... 42

Annexure 3: Officials who participated in preparation of the plan ................................................ 106

Annexure 4: Strategy proposed for low burden blocks .................................................................. 108

Nanded District Swachhata Plan 2

PriMove Pune UNICEF Mumbai

1. INTRODUCTION

1 State and District Vision

The Government of Maharashtra (GoM) has recently

announced its vision of making the state Open

Defecation Free (ODF) by March 2018.1 In order to

contribute to this vision of the GoM, Zilla Parishad,

Nanded decided to make the district ODF by December

2017 and developed an appropriate strategy and

detailed action plan, outlined in this document.

1.1 Current sanitation situation in the district

A snapshot of the sanitation situation, as of January 2017, with respect to baseline Survey

2012 (BLS-2012) is presented in Table-1 below.

Table-1: Sanitation coverage in Nanded district:

Total Units 16 Blocks 1306 Gram Panchayats (GPs)

4,51,045 hhs

Sanitation coverage 0 block ODF 70 (5.36%) 1,76,225 hhs (39.07%)

Target 16 1236 (94.64%) 2,74,820 hhs (60.92%) Source: http://sbm.gov.in/sbmreport/Report/Physical/SBM_TargetVsAchievement.aspx/07.01.2017

1.2 The Targets

1.2.1 Target as per BLS 2012

An analysis of block wise status of

sanitation reveals that out of the 16 blocks

to be made ODF, 1 block has coverage

above 65%, 4 blocks have coverage

between 45% and 65%, 8 blocks have

coverage between 30% and 45%, and

remaining 3 blocks have coverage below

30%. Details are given in table-2, below.

Five blocks (Kandhar, Kinwat, Loha,

Mukhed and Hadgaon) have a target above

1 Announcement by Hon Chief Minister of Maharashtra on 19/11/2016

0%

20%

40%

60%

80%

100%

Ard

hap

ur

Bh

oka

r

Bilo

li

Deg

lur

Dh

arm

abad

Had

gao

n

Him

ayat

nag

ar

Kan

dh

ar

Kin

wat

Loh

a

Mah

ur

Mu

dkh

ed

Mu

khe

d

Nai

gao

n

Nan

ded

Um

ri

IHHL target and achievement

Achivement Target

Nanded District Swachhata Plan 3

PriMove Pune UNICEF Mumbai

25,000 units in 380 GPs and contribute about 54% of the total target. Hence, these blocks

need special attention.

There are 189 GPs which have target below 50 IHHLs. Total 222 GPs have target above 350

IHHLs and these 222 GPs bear nearly 41.42% (1,13,844 IHHLs) of the district’s target.

Table -2: IHHL coverage and targets

Sr. No.

Block Total GPs

Total HHs

ODF GPs

% of ODF GPs

IHHL Coverage %

Target in numbers

1 Ardhapur 39 12848 14 35.90 76.91 2966

2 Bhokar 45 19812 3 6.67 57.96 8329

3 Biloli 50 25348 4 8.00 38.07 15697

4 Deglur 51 31453 2 3.92 34.10 20727

5 Dharmabad 58 12550 0 0.00 47.37 6605

6 Hadgaon 62 47697 3 4.84 43.60 26902

7 Himayatnagar 66 19027 0 0.00 39.00 11606

8 Kandhar 73 45046 3 4.11 28.12 32377

9 Kinwat 73 45976 5 6.85 24.71 34616

10 Loha 80 40389 9 11.25 29.38 28524

11 Mahur 90 17412 5 5.56 41.98 10102

12 Mudkhed 116 16192 4 3.45 59.00 6639

13 Mukhed 118 41387 6 5.08 35.12 26851

14 Naigaon 124 33574 4 3.23 42.65 19254

15 Nanded 127 25259 5 3.94 46.89 13414

16 Umri 134 17075 3 2.24 40.20 10211

Total 1306 451045 70 5.35 39.07 274820

Source: http://sbm.gov.in/sbmreport/Report/Physical/SBM_TargetVsAchievement.aspx/07.01.2017

Following map presents the block wise targets of IHHL construction.

Nanded District Swachhata Plan 4

PriMove Pune UNICEF Mumbai

Target of additional families and

defunct toilets add to the target

load in the district.

The total target (BLS 2012 +

additional families without

IHHLs + defunct toilets) in the

district is 2,89,962 IHHLs

Five blocks (Kandhar, Kinwat,

Loha, Mukhed and Hadgaon)

contribute about 54% of the

total target.

1.2.2 Additional families and defunct toilets:

Two additional factors add to the target load. These

are additional families and defunct toilets in the

district.

7,705 new households formed in GPs after

baseline survey, do not have a toilet, and

4% of total toilets built so far are in some

state of repair and are not in useable

condition or used for other purposes

(defunct toilets)

These households, totalling about 15,142, also need

to be covered to achieve complete elimination of

open defecation. Block wise status of additional

families and defunct toilets in the district is presented in Table-3.

Nanded District Swachhata Plan 5

PriMove Pune UNICEF Mumbai

Table-3 additional families and defunct toilets in Nanded

Sr. No.

Block Total No. of HHs

Total additional

families

Defunct toilets

Total defunct toilets

% to total families with

IHHLs

1 Ardhapur 12848 3499 6 0%

2 Bhokar 19812 NA 317 3%

3 Biloli 25348 NA 1232 13%

4 Deglur 31453 NA 179 2%

5 Dharmabad 12550 2669 242 4%

6 Hadgaon 47697 NA 1611 8%

7 Himayatnagar 19027 NA 402 5%

8 Kandhar 45046 NA 148 1%

9 Kinwat 45976 NA 485 4%

10 Loha 40389 NA 328 3%

11 Mahur 17412 NA 266 4%

12 Mudkhed 16192 1537 66 1%

13 Mukhed 41387 NA 1121 8%

14 Naigaon 33574 NA 779 5%

15 Nanded 25259 NA 64 1%

16 Umri 17075 NA 191 3%

Total 451045 7705 7437 4% NA: Data not available

Nanded District Swachhata Plan 6

PriMove Pune UNICEF Mumbai

2. ENABLING FACTORS AND BOTTLENECKS

Nanded district has done well in moving towards

achieving 100% ODF status in the district. This

achievement is due to a vibrant enabling

environment, though bottlenecks exist in some

aspects. The same are presented in the

schematic below. In moving forward, this

strategy aims to strengthen the enabling factors

and address bottlenecks.

-Utmost importnace by theCEO- regular reviews,monitoring

-Social media based dailymonitoring mechanismalready functional

-Smooth and timely fundtransfers

-Capable and dedicated staff

-Availability of manpowertrained on ODEP (4 mastertrainers and 8 motivators)

-Good efforts for IEC/ BCC fortoilet + bathroomconstruction

-High promotion of magic pitfor excreta management

- Material for toilet constructionis available in all blocks

- Large geographical area with high number of blocks

-Psychological barriers for usage of toilets

-High number of big GPs ( 206 GPs with more than 500 households)

-Access to internet facilities to BRCs only in 6 blocks

-5 BCs and 13 CCs posts vacant (almost 33%) out of 16 and 39 sanctioned posts respectively

- Language barriers in blocks situated on state boundaries

-Issues in baseline survey data

-Less human power with technical knowledge of two pit toilets

-Less involvement from village level functionaries of other departments

-Less effective convergence of government schemes

-Less time period available for achieving the target

ENA

BLI

NG

EN

VIR

ON

MEN

TB

OT

TLENEC

KS

Nanded District Swachhata Plan 7

PriMove Pune UNICEF Mumbai

3. THE STRATEGY

This section presents the strategy and action plan adopted by Zilla Parishad, Nanded to

achieve the goal of making the district ODF by December 2018. While the primary aim of

the strategy is to cover the BLS-2012 target, the strategy also focuses on covering additional

families without toilets and families with defunct toilets, in convergence with other

programs. Another key focus area of the strategy is to ensure sustainability of the ODF

status.

The unit of planning in this strategy is a block and builds on three pillars; (i) Demand

Management (ii) Demand Response Mechanism and (iii) Oversight and monitoring. Key

elements of these pillars are explained in the schematic diagram presented below.

Next section of this document details the key strategic actions followed by the action plan.

• Strategic planning and prioritization of IHHL construction

• Rolling out ODEP process for generating demand at village level and its consolidation at higher levels

• Behaviour change communication for demand generation at hosuehold level

• Involvement of elected representatives for higher visibility, enhanced outreach and oversight

• Involvement of other stakeholders for positive behaviour change

Demand Management

• Monitoring quality of construction of toilets

• Effective convergence of government schemes

• HR development and deployment to high burden areas

• Supply chain management

• Effective fund flow mechanism

Demand Response

Mechanism

• Daily monitoring

• Oversight by elected representatives

• Concurrent online and offline data entry

• Regular meetings of people involved in implementation

• Development of a special third party task force for monitoring

• Sustainability monitoring

Oversight and Monitoring

Nanded District Swachhata Plan 8

PriMove Pune UNICEF Mumbai

4. STRATEGIC ACTIONS AND ACTIVITY PLAN

The key strategic actions and a detailed action plan under the three strategic pillars are

captured in this section.

4.1 Demand Management

While there is a good awareness

about need for adopting

sanitation behaviour, there are

some sections where the

awareness is not yet translated

into demand. Hence, generating

demand for building toilets

among these sections is

paramount. Second, creating

demand for making the entire

GP ODF is also equally important and hence demand creation is a non-negotiable in this

strategy.

The district would adopt three processes for this;

ODEP process- for generating demand for making the GP ODF,

Behaviour Change Communications (BCC) for generating demand for building toilets and

using them, and

Effective engagement of elected representatives and other key stakeholders for proving

overall leadership and oversight to the drive.

This section presents the strategic actions related to generation, articulation and

consolidation of demand for sanitation.

District Swachhata

Plan

Oversight and

monitoring

Demand response

mechanism

Demand Management

Demand Management

Strategic planning and prioritization IHHL construction- (for BLS-2012 families, additional families and defunct toilets)

Rolling out ODEP process for generating demand for making GPs ODF Behaviour change communication for triggering household’s demand for building

and using toilets Engagement of elected representatives for effective leadership and overall

oversight Involvement of other stakeholders, as required

Nanded District Swachhata Plan 9

4.1.1: Strategic planning and prioritization IHHL construction All the 1236 GPs will be targeted simultaneously but the achievement of ODF status is likely to spread in the next 12 months, based on the burden. While the GPs with very low burden are expected to become ODF earlier, focusing on high burden GPs is a non-negotiable. a. BLS-2012 families On the basis of GP wise data, planning for achieving ODF status of each GP was undertaken and plotted against monthly time frame. Based on this, the likely time frame for each block to become ODF was also estimated. These details are presented in Table-4.

Table -4: Month wise planning for making GPs and Blocks ODF

Sr. No.

Block Total GPs

Already ODF

Month wise no. of GPs to be made ODF Total

To be made

ODF by Jan-17

Feb-17

Mar-17

Apr-17

May-17

Jun-17

July-17

Aug-17

Sept-17

Oct-17

Nov-17

Dec-17

1 Ardhapur 39 14 7 15 3 39 Mar-17

2 Bhokar 45 3 13 1 49 66 Mar-17

3 Biloli 50 4 1 7 14 6 41 73 Jun-17

4 Deglur 51 2 6 5 7 3 4 1 7 55 90 Aug-17

5 Dharmabad 58 0 2 1 3 2 2 2 1 7 15 10 45 Dec-17

6 Hadgaon 62 3 11 8 102 124 Mar-17

7 Himayatnagar 66 0 1 19 12 4 6 2 1 6 51 Dec-17

8 Kandhar 73 3 35 51 15 12 116 Dec-17

9 Kinwat 73 5 5 2 1 7 5 14 5 13 2 4 22 49 134 Dec-17

10 Loha 80 9 2 14 20 19 20 34 118 Dec-17

11 Mahur 90 5 2 3 6 32 14 62 May-17

12 Mudkhed 116 4 4 4 3 3 1 7 10 12 2 50 Oct-17

13 Mukhed 118 6 2 2 13 10 5 74 15 127 Oct-17

14 Naigaon 124 4 5 16 9 27 10 4 5 80 Aug-17

15 Nanded 127 5 12 4 8 11 10 2 2 4 5 7 2 1 73 Dec-17

16 Umri 134 3 3 4 15 33 58 Aug-17

Total 1306 70 63 50 266 85 100 161 50 151 102 57 40 112 1306 Dec-17

Nanded District Swachhata Plan 10

PriMove Pune UNICEF Mumbai

As per the Zilla Parishad goal, all the reaming 1236 GPs from 16 blocks are to be made ODF

by December 2017. Following is the detailed planning-

3 blocks Ardhapur, Bhokar and Hadgaon are to be made ODF in March 2017

Mahur block to be made ODF in May 2017 and Deglur block to be made ODF in June 2017

Dharmanad, Naigaon and Umri blocks to be made ODF in August 2017

2 blocks – Mudkhed and Mukhed to be made ODF in October 2017

Remaining 6 blocks to be made ODF in December 2017

Making high burden GPs (more than 350 IHHLs) ODF is a challenge and therefore need

special attention.

The blocks with low targets will be focused in priority on a mission mode and will be

made ODF under saturation approach. Specific strategy- approach would be adopted for

these blocks or GPs, which is described in detail in annexure 4.

The district has 222 GPs with IHHL target above 350 and these GPs bear nearly 41.42%

(1,13,844 IHHLs) of the district’s target. Out of the 222 GPs, 82 GPs have target more

than 500 IHHLs and contribute 21% of the districts total target. Focused approach can be

applied for making high burden GPs ODF in short duration. Focused approach; similar to

that of the low burden blocks; needs to be adopted for these GPs. The selection of the

GPs will be done in sync with the block wise strategic planning presented above.

6350

266

85100

161

50

151

102

5740

112

Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17

Month wise plan for making GPs ODF

Nanded District Swachhata Plan 11

PriMove Pune UNICEF Mumbai

The momentum for rolling out ODEP has already begun in the district. 4 master trainers and 8 motivators already trained, and 32 master trainers 240 motivators and 4468 co-facilitators to be trained further. This human resource will be primarily responsible for implementation of the strategic actions at GP/ block level.

b. Additional families and defunct toilets:

As discussed earlier, additional families and

defunct toilets add to the open defecation

burden in the district. These families would

also be targeted under the strategy. This

exact status under these categories will be

clarified and confirmed during ODEP process

and the action plan for addressing such

families will be finalized during the process

itself. The MREGS functionaries at village and

block level will be involved in the process,

and a realistic plan will be developed.

Additional families and defunct toilets will be targeted in the same time frame proposed in

the above table for achieving ODF status. The process for addressing these families is

elaborated further under the section on convergence.

4.1.2 Rolling out ODEP Process

Open Defecation Elimination Plan (ODEP) is an effective tool for mobilizing community,

triggering action and generating implementable plan for eliminating open defecation in the

GP. The actual targets in each GP will be revisited during the ODEP process and realistic

plans for target the GPs and Blocks will be drafted.

Nanded District Swachhata Plan 12

PriMove Pune UNICEF Mumbai

The momentum for rolling out ODEP has already begun in the district. Four master trainers

and eight motivators from Zilla Parishad, Nanded have already been trained, and are ready

to train other

personnel at district/

block level. Additional

32 master trainers

240 motivators and

4468 co-facilitators

will be trained

through district and

block level trainings

on ODEP.

The district has

decided that in GPs

with target less than

50 IHHLs, the ODEP

process will not be

implemented. These

GPs will be focused for direct action.

Nanded District Swachhata Plan 13

PriMove Pune UNICEF Mumbai

The GP team comprising of gramsevaks, teachers, communication champions, and AWWs with support of Sarpanch and MPW will be facilitators of the process.

The 4 master trainers and 8 motivators already trained during ToTs will be responsible for

the district and block level trainings. These will be the chief facilitators of the training and

DWSM team will provide handholding support. The district level training will be for 3 days

where 2 EOPs and one motivator from each block will be trained. The block level trainings

will be for one day where remaining 14

motivators, AWWs (one from each GP),

teachers, gramsevaks and communication

champions will be trained. Around 2-4

batches of the trainings depending upon the

size of the block will be conducted. A GP

wise schedule of ODEP process will be

finalized during the block level trainings. The process will be implemented in each GP for

two days as per the schedule. The GP team comprising of gramsevaks, communication

champions, and AWWs with support of Sarpanch and MPW will be facilitators of the

process. The master trainers and motivators will ensure quality of the process. Their main

roles and responsibilities are listed below.

Nanded District Swachhata Plan 14

PriMove Pune UNICEF Mumbai

ROLES AND RESPONSIBILITIES OF ODEP TEAM (MASTER TRAINERS, MOTIVATORS,

CHAMPIONS)

Rolling out ODEP process

Organization and facilitation of district and block level trainings and preparation of GP wise schedule for ODEP process

Facilitation during ODEP process in each target GP

Preparation of ODEP report and its consolidation

Monitoring the action plan implementation process in GPs

Behaviour Change Communications (BCC):

Support in preparation of BCC plan

Planning and conducting Home visits

Identifying some of the good ODF GPs for knowledge sharing

Involvement of elected representatives

Support in sharing copies of the District Swachhata Plan with political leaders

Compilation and sharing Gat wise data

Ensuring Quality of Toilets Construction

Support during training of masons and village functionaries

Monitor toilet construction quality in each GP during and after construction

Effective Convergence

Support during interdepartmental meetings for convergence

Efforts and support for allocation and disbursal of funds from MREGS and other schemes

Supply chain management

Efforts for involvement of masons groups

Communication with the functionaries and villagers

Support for the Helpline

Fund flow

Cross verification of receipt of incentive amount by the beneficiary

Oversight and Monitoring

Review of block wise/ gat wise progress

Sustainability plan

Support implementation of the sustainability activities at GP level

Planning and monitoring of sustainability activities

Nanded District Swachhata Plan 15

PriMove Pune UNICEF Mumbai

The ODEP action plan will be prepared and displayed in public place in every GP. The ODEP

process will be adapted as per the need and target volume of the GPs. The ODEP plans will

be consolidated at block and district levels. The BDOs, EoPs and Dy CEO (WATSAN) will

closely monitor the ODEP process roll out.

The ZP will ensure smooth flow of funds and involvement of all village level functionaries,

for the process. The ZP will also arrange appropriate transport facilities for the ODEP team

for their travel to villages.

4.1.3 Behaviour Change Communications (BCC):

A district level training for planning BCC activities and effective use of BCC materials will be

organized for the block and village level functionaries, to prepare a detailed BCC plan of

action. The proposed BCC activities are listed below.

Village level Block level District level ODEP process Home visits Toilet bhumipujan(mark out) Ward meetings (in presence of GP

members) GP resolution for implementation

of police act article 115 117 & making GP ODF by certain date.

Sanitation celebration (after becoming ODF)

Good morning squads Night meetings Kalapathaks Cultural activities Nirmal Bachat gat Displaying list of beneficiaries who

received incentive

Workshop of SHG adhyaksha

Meeting of school principals

Publishing photos of ODF GP’s sarpanch and gramsevaks on a flex

Village visits Exhibitions , preparation of

models Block level competitions Block Sanitation

celebration Ex-students get together Coffee with winners Nirmal Mahila Bahumaan Posters for doctor

prescriptions Reporters’ meeting

Flex for appeals Planning and monitoring

workshop (BDO/ ABDO/ EoP (SBM)/ BRCs )

Workshop of master trainers (roles and responsibilities)

Bus stand ads/ jingles Ads/ jingles on radio District atmasanman

workshop Sanitation park Promotion on social media Broadcasting on Swachh

Maharashtra Radio

Summary of strategic actions for ODEP roll out

Conducting district and block level trainings & finalizing GP wise process schedule

Implementation of the planning process in GPs

Submission and consolidation of plans

Implementation of the plans

Monitoring of the process by the district and block level officials

Nanded District Swachhata Plan 16

PriMove Pune UNICEF Mumbai

All relevant communication materials and tools will be developed by the district and

distributed through most appropriate channels. The key materials are:

a pocket diary on technical information,

pamphlets on importance of total sanitation,

stickers and flex on police act, pledge to make GPs ODF

Specially designed items like glasses, cups, watches with the emblem of sanitation

pledge.

Good practices case studies

Besides, the district would organize cross learning visits to GPs that have already achieved

ODF status and are sustaining the same. ‘Coffee with winners’ will be implemented in every

block in which BDOs and PS chairman will discuss with top achievers in the block.

The district has also decided that in every GP, the list of beneficiaries who received incentive

under SBM will be displayed. The SHGs where all members have toilets will be declared as

Nirmal Bachat Gats.

4.1.4 Involvement of elected representatives for oversight and effective monitoring

In all, there are There are about 198 elected

representatives at various levels (excluding GP

level) in Nanded district and could provide

leadership for the program. This draft strategic

plan would be discussed with them and finalized

with their inputs. The steps for enhanced

ownership and involvement of these leaders are;

- Requesting them to discuss and review

progress on district swachhata plan during their meetings like District Planning

Committee (DPC) meetings, Zilla Parishad meetings, Panchayat Samiti meetings.

-Regular progress reports would be prepared for each ‘Gat’ and shared with the leaders for

their update and actions. The gat wise status sheet will be updated and will be discussed on

priority during every monthly meeting of ZP members.

Table 5: No. of elected representatives

Designation Number

MPs 3

MLAs 8

MLC 1

ZP members 62

PS members 124

Total 198

Summary of strategic actions for Behaviour change communication

Preparation of BCC plan

Preparation and distribution of communication tools/ material

Home visits

Identifying good ODF GPs for knowledge sharing

Coffee with winners - block level and Nirmal Bachat Gats and displays - GP

level

Nanded District Swachhata Plan 17

PriMove Pune UNICEF Mumbai

Involvement of political leaders is crucial for awareness, demand generation as well as for oversight. For this, a Gat level Task Force (GTF) will be set up and gat wise status of sanitation will be discussed and monitored based on real time data.

- Decision may also be taken for recognition of good work/

approach by a Gat or functionary.

- A Gat level Task Force (GTF) of elected

representatives and government officers from

every Gat will also be formed for coordinating

implementation of the strategy and its oversight

as required. The GTF will be led by the ZP

member and will include the PS members,

Extension officers, BRCs, other line department

officials, Gramsevaks, etc.

4.1.5 Involvement of Other Stakeholders -

Apart from the political leaders, many other stakeholders play an important role in the

society and could influence the sanitation behaviour of the people, to varying degrees.

These stakeholders include social leaders, SHG members, CBOs, NGOs, religious leaders,

social units of companies, police patils, police department, KRC members, NSS students, etc.

Data regarding these stakeholders will be collected. Apart from one to one communication

with these stakeholders, the District Swachhata Plan would also be presented to them, in a

workshop, to elicit their interest and register their willingness to support the same.

Interest/ commitment expressed by them would be recorded and the ZP would make all

arrangement to enable their active and timely involvement.

4.2 Demand Response Mechanism

Nanded district has a good demand response mechanism for sanitation and efforts would

be made to build on this system. The key aspects that would be strengthened are; (i)

monitoring technical quality of construction, (ii) strengthening/ supplementing financial

resource mobilization, (iii) ensuring effective supply chain links, (iv) effective convergence,

and (v) making available capable and optimal human resources. Following section presents

the key strategic aspects of the response mechanism in the district.

Summary of strategic actions for involvement of elected representatives

Involvement of ministers, MPs and MLAs

Gat (cluster) approach for involvement of ZP members, PS members and key

district officials

Gat level Task Force (GTF)

Presentation for district and block officials

Nanded District Swachhata Plan 18

PriMove Pune UNICEF Mumbai

Quality of toilets will be ensured through technical trainings to masons and functionaries, quality monitoring during and after construction and awareness generation through development of sanitation parks.

4.2.1: Monitoring Quality of Toilets Construction

Proper monitoring of the toilets during construction and quality assurance needs to be

ensured for reducing the number of defunct

toilets, in future. The following steps have been

designed to ensure quality of toilets built;

A one day training of village level

functionaries regarding technical quality will

be organized in each block. During the

training, technically appropriate construction

of various types of IHHLs will be discussed,

highlighting the key technical aspects to be checked and monitored during and after

construction.

Training of masons in every block will be organized to explain technicalities of various

types of toilets. A check list/ information sheet regarding toilet technology designs and

technical considerations will also be provided to the masons.

The motivators/ co-facilitators will monitor toilet construction quality in each GP

during and after construction.

The master trainers and BRCs will randomly monitor IHHL quality. Inappropriate

construction will be reported to the district level officials who in turn will take

corrective measures.

Sanitation parks will also be developed where the households will get cost effective

quality material, guidance for construction and reference to masons. These sanitation

parks will work for spreading technical information and also timely availability of

material and service providers.

The district plans to use precast superstructures, and will ensure the quality of the

same.

Summary of strategic actions for ensuring quality of construction

Training of village level functionaries Masons training

Quality monitoring

Development of sanitation park

Demand Response Mechanism

Monitoring quality of toilets construction

Effective convergence of government schemes

HR development and deployment to high burden areas

Supply chain management

Effective fund flow mechanism

Nanded District Swachhata Plan 19

PriMove Pune UNICEF Mumbai

Convergence of government schemes will mainly aim at providing benefits to additional families, non-eligible families under SBM and for repairs of defunct toilets.

4.2.2 Effective Convergence of Government Schemes

The ZP proposes to develop an effective convergence between relevant government

schemes and the same would be implemented, as shown below.

- The eligible families under SBM will be targeted under SBM.

- Convergene with MREGS is crusial to achive the target of IHHL construction

- Funds from other schemes like MREGS, PAY, CSR funds would be mobilized for

households with defunct toilets and additional households without toilets.

- Remaining households which would not be eligible for any of the above funds would

be motivated to use their own resources.

For this, various activities will be implemented which

include interdepartmental meetings for discussion of

scheme wise targets and plan, aligning the

construction targets to the respective AIPs of the

departments, documentation of MREGS fund disbursal

process and its dissemination to concerned

stakeholders, etc.

4.2.3. HR development and deployment to high burden areas

Adequate, capable and responsive human resources at all levels are necessary for a robust

response mechanism. In Nanded district, there are 14 positions of DWSM experts

sanctioned, all of which are filled. As far as BRC members are concerned, 55 positions in the

district are sanctioned, out of which 37 have been filled. It can be noted that the vacant

positions are seen in high burden blocks like Deglur, Himayatnagar, Kandhar, Dharmabad,

etc. This needs to be addressed on priority.

Table 7: Status of HR at block level No Block Positions Sanctioned Recruited No Block Positions Sanctioned Recruited

1 Ardhapur 3 2 9 Kinwat 4 3

2 Bhokar 3 3 10 Loha 4 3

3 Biloli 3 3 11 Mahur 3 2

4 Deglur 4 1 12 Mudkhed 3 2

5 Dharmabad 2 1 13 Mukhed 4 2

6 Hadgaon 4 4 14 Naigaon 4 3

7 Himayatnagar 3 1 15 Nanded 4 4

8 Kandhar 4 1 16 Umri 3 2

Source: Data received from the district Total 29 21

Summary of strategic actions for effective convergence

A meeting of officials of various departments Aligning the AIPs of various departments

Construction of toilets for additional families

Repairing defunct toilets

Nanded District Swachhata Plan 20

PriMove Pune UNICEF Mumbai

The block level

human resources

from ODF blocks will

be temporarily

shifted to the high

burden blocks, in

view of the high

burden shouldered by

the staff from non-

ODF blocks.

Efforts will be made for

involvement and training of

masons already functional in

many blocks/ GPs.

Considering the present availability of human resources in the district, following are the

actions proposed under the strategy.

The block level human resources from ODF blocks will be temporarily shifted to the high

burden blocks, in view of the high burden shouldered by the staff from non-ODF blocks. E.g.-

three out of the four BRCs from Hadgaon can be shifted after March 2017 (after it becomes

ODF) to the next block targeted for making ODF- say, Mahur block. After Mahur block is

made ODF in May 2017, three BRCs from Hadgaon and one BRC from Mahur will be shifted

to Umri, and so on. One BRC will be retained in the block for regular work of the BRCs and

remaining members will be shifted. Following schematic presents the HR transfer policy.

Following are other activities

to be implemented in the

district for HR development

and deployment-

- Specific ‘Gats’ would

be allocated to each

BRC member and

Extension Officer for

exclusive focus.

- Efforts would be made

to rope in officers

from other departments (MREGS, NRLM, ICDS, education, health

and revenue department etc.), Gat wise, as required and feasible.

- The ODEP master

trainers will be allotted the

responsibility of SBM

implementation.

- A refreshers training

on ODEP to the master

trainers and motivators is

proposed, where the knowledge regarding ODEP will be refreshed and the critical

issues faced by the master trainers and motivators during implementation will also

be addressed. Guidance will also be provided on how to achieve the remaining

targets by December 2017.

-A MREGS task force will be developed at the district level which will aim at

streamlining and smooth functioning convergence with MREGS. A film or process

Nanded District Swachhata Plan 21

PriMove Pune UNICEF Mumbai

guideline for receiving benefits for sanitation under the scheme may also be

released. -Various capacity building events will be organized as follows-

Block level District Level

Orientation for sarpanchas and gramsevaks,

village level government functionaries,

religious leaders, SHGs, etc. on SBM (G)

implementation

Technical training for masons, motivators,

village functionaries

ODEP training

Training regarding home visits

Training on ODF+ and sustainability

Training of communication champions

Workshop of elected representatives

Training on ODEP

Training on ODF + and sustainability

Training on time management for

DWSM members, EoPs, BDOs and

BRCs

4.2.4 Supply chain management

Considering the IHHL construction targets, huge supply chain arrangements are required.

Availability of trained masons, availability and information about material suppliers and

service providers and their management is critical.

Presently, masons are functional in every block who contribute to the toilet construction

activity. There are also many material suppliers in the district for materials like sand,

cement, bricks, pipes, pans, etc.

Following are the strategic actions proposed for supply chain management in Nanded

district-

First of all, every block will prepare a list of trained masons, precast and other

material suppliers/ service providers available in the block. The lists will also include

the masons’ groups. These lists will be further consolidated at district level. This will

clearly put forth the picture of adequacy and need of additional supply chain

arrangements.

Summary of strategic actions for HR development and deployment

Transfer of HR to high burden areas

Refresher training to master trainers and motivators

Involvement of NRLM and MREGS and health department staff

Development of MREGS task force

Various CB activities at district / block level

Nanded District Swachhata Plan 22

PriMove Pune UNICEF Mumbai

A block level workshop of service providers and suppliers, including the masons, will

be organised immediately to inform them about the present need and their

expected involvement and support. Critical aspects like timely availability of supplies,

rate negotiations, transport facilities, etc. may be discussed with them during the

workshop.

Just like BRC staff, even the masons and suppliers can also be shifted from ODF

blocks to the high burden blocks. Their willingness and availability for support in

other blocks may be finalized in the block level workshop. The list of masons and

suppliers in each block will be published on the web for easy access by the

functionaries and villagers. The lists will also be made available in every GP the

Gramsevak will help the villagers in identifying a mason and supplier based on the

list.

4.2.5 Effective Fund Flow Mechanism

The following steps would be adopted by the ZP to enhance fund flow speed and

effectiveness;

- Once, a toilet is completed and verified, the funds will be transferred to the beneficiary

account within 10 days

- The ZP would dialogue with all the private companies situated in the district and try to

raise CSR funds, to the extent possible.

- Maharashtra state government recently formed a Swachh Maharashtra Kosh (Fund) on

the lines of Swachh Bharat Kosh. The district would submit a proposal to avail the Kosh

funds.

Summary of strategic actions for supply chain management

Making a list of masons, suppliers/ service providers

Efforts for involvement and awareness of suppliers and masons

Shifting of masons to high burden blocks

Communication with the functionaries and villagers

Summary of strategic actions for efficient fund flow

Transfer of funds within 10 days from toilet construction

Meetings with companies for CSR

Demand from Swachhata Kosh

Nanded District Swachhata Plan 23

PriMove Pune UNICEF Mumbai

4.3 Oversight and Monitoring

SBM gives importance to monitoring both outputs (Toilet Construction) and of Outcomes

(Toilet usage). The following steps would be taken to improve the speed and quality of

monitoring.

Daily monitoring- The district already has a daily monitoring mechanism in place. For

district level review and monitoring, a social networking group of all BDOs has been set

up. The District level officials and the CEO review block wise progress, daily. This

mechanism would also be used for financial progress and activity

monitoring.

Oversight by political leaders- As discussed before, oversight of sanitation

activities and progress in their respective Gats/constituencies by elected

representatives would be institutionalized.

Concurrent online and offline data- The district and block level functionaries are also

taking special efforts for maintaining concurrent online and offline data, which is found to

be useful in reducing data gaps and enable faster uploading on the website. This good

practice would be continued.

Fortnightly meeting of motivators- A fortnight meeting of all motivators

will be conducted at block level by concerned DWSM experts. This block

level review will be done GP wise and feedback on future planning and

addressing challenges will be provided to the motivators. Block wise/ Gat

wise progress will also be communicated to the Blocks, GTF and other

stakeholders to enable

their timely actions.

Regular meeting of

master trainers at

district level- similarly,

DWSM experts will

also conduct regular

meetings of the

master trainers, at the

block/district level to

review block wise

progress and plan

future actions.

Third Party Monitoring- Apart from the official review, a third-party task force will be set

up for reviewing the on-field status of program implementation to provide real and

What to monitor

Time for proposal

verification and incentive

disbursement

ODF Status

Toilet construction

quality

Physical and financial progress

Process - ODEP, convergence,

incentive disbursal, CB,

etc.

Nanded District Swachhata Plan 24

PriMove Pune UNICEF Mumbai

unbiased status (both quality and quantity) of progress and will also keep a check on the

functionaries.

Monitoring at block level by guardian officer- The guardian officers along

with concerned block representative from DWSM will review the block level

progress weekly. During this revie, along with physical and financia progress

review, the guardian officer will review the process and issues therein. They

will work as a link between block and district.

• Equitable distribution of blocks among DWSM members for oversight and review- The

16 blcoks need to be distributed equally among the DWSM members for oversight and

review. Transport facilities need to be provided to the concerned officials for block/ GP

visits.

Summary of strategic actions for oversight and monitoring

Daily monitoring

Oversight by political leaders

Concurrent online and offline data

Fortnightly meeting of motivators

Regular meeting of master trainers at district level

Development of a special third party task force for monitoring

Monitoring at block level by guardian officer

Equitable distribution of blocks among DWSM members for oversight and review

Nanded District Swachhata Plan 25

PriMove Pune UNICEF Mumbai

4.4 Sustainability Plan

Sustaining ODF status is very crucial for realizing the intended benefits of SBM initiatives

and the following activities are planned for the same;

The ZP would develop special IEC and BCC activities focusing on use and

maintenance of toilets and would implement the same to influence individual/

household and community behaviours.

Follow up and monitoring system will be set up in every GP. This system will

comprise of Open Defecation Elimination Follow up Committee and a Toilet Use

Monitoring/ Nigrani Committee. These committees will take care of maintenance of

sanitation structures and will monitor the ODF+ activities and ZP will train them

adequately for the same.

The OD status within GPs that achieved ODF status would be monitored and

analysed periodically.

The status reports, along with deviations and course correction measures, would be

shared with all key stakeholders for their action.

To ensure continued improvement in environmental sanitation, the ODF+ activities

will also be promoted in all ODF GPs. These include activities for effective SLWM,

personal hygiene, MHM, institutional sanitation etc.

Village sanitation days will be planned and implemented and topics for discussion

will be based on the context and specific need of the GP. Also, discussions regarding

sanitation will be held during every gramsabha.

Nanded District Swachhata Plan 26

Institutional arrangements for implementation of the strategy

Institutional arrangements Functions

D I S T R I C T

Policy making at district level.

Preparation of district level Plan including BCC and CB plan

Staff deployment to high burden areas

Efforts for involvement of political leaders, religious leaders, social leaders, etc.

Organization of Capacity Building and Behaviour Change Communication activities

Convergence of government schemes through inter departmental co-ordination

Disseminate all relevant information to all project stakeholders

Monitoring physical and financial progress and process

Timely and efficient funds disbursal/ fund management

Reporting / accountability to WSSO

B L O C K

Organization of BCC and awareness, community mobilization and triggering activities Capacity building of GP members, VHNWSSC members, & other functionaries

Providing required support for village level implementation of NBA Transfer of funds to GPs and financial management under the project

Disseminate all relevant information and instructions to all project stakeholders

Efforts for involvement of political leaders

Data management and submission of reports to the district in prescribed formats

Technical support and Supply Chain Management

Monitoring, support and consolidation of village level ODEP action plans

Review and monitoring of village level works through regular visits and meetings

Identifying some of the good ODF GPs for knowledge sharing

Uploading data online

Special attention on high burden GPs or clusters

G P

Preparation and implementation of community led village level ODEP action plans

Awareness and behaviour change communication regarding sanitation through various campaigns, activities, rallies, home visits, meetings, IPC, swachhata din and sabha etc.

Motivating villagers and ensure community participation in implementation

Implementation of effective convergence

Management of toilet construction

Creation and maintenance of sanitation facilities and monitoring

Village level data collection and management, social audit and participatory monitoring

Nanded District Swachhata Plan 27

PriMove Pune UNICEF Mumbai

NON-NEGOTIABLES FOR THE STRATEGY

District level

Strategic push and priority at all levels

Timely release of funds to blocks

Deployment of HR from ODF blocks to other blocks / high burden

GPs

Convergence of government schemes, MREGS task force

Involvement of elected representatives

Effective monitoring mechanism - Physical and financial progress

(SBM, MREGS and other relevant schemes),

Block level

Continued focus on high burden GPs (target above 400 IHHLs)

Cluster (Gat) approach

Special efforts for PRI involvement

Facilities to ODEP team

Involvement and training to masons groups

Effective monitoring mechanism- Physical and financial progress

(SBM and MREGS), process (ODEP, convergence, CB, etc.), time

for proposal verification and incentive disbursement, toilet

construction quality, ODF Status

Nanded District Swachhata Plan 28

PriMove Pune UNICEF Mumbai

Key strategic actions 1. Demand Management 1.1: Strategic planning and prioritization for IHHL construction 1.2: Rolling out ODEP process for generating demand at village level and its consolidation

at higher levels Conducting district and block level trainings

Implementation of the planning process in GPs

Implementation of the plans and its monitoring by the district and block level officials

1.3 Behaviour change communication for triggering positive behaviour and prioritising sanitation

Preparation of BCC plan

Preparation and distribution of communication tools/ material

Home visits

Identifying good ODF GPs for knowledge sharing

1.4 Involvement of elected representatives for demand generation and effective monitoring

Gat (cluster) approach for involvement of ZP members, PS members and key district officials

Formation of Gat level Task Force (GTF)

1.5 Involvement of other stakeholders for positive behaviour change

2. Response mechanism to demand 2.1 Monitoring quality of construction for effective waste management Training of village level functionaries and masons groups

Quality monitoring

Development of sanitation park

2.2 Effective convergence of government schemes Meeting officials of various departments and aligning sanitation activities to their AIPs

Construction of toilets for additional families and repairing defunct toilets

2.3 HR development and deployment to high burden areas Transfer of HR to high burden areas

Refresher training to master trainers and motivators

Involvement of NRLM and MREGS and health department staff

Development of MREGS task force

CB activities at district and block level

2.4 Supply chain management Making list of masons/suppliers, sharing with functionaries/ villagers, efforts for involvement

Efforts for involvement and awareness of suppliers and masons

Shifting of masons to high burden blocks

2.5 Efficient fund flow mechanism Demand note in advance by blocks, transfer funds within 10 days from construction

Meetings with companies for CSR, demand from Swachhata Kosh

3. Oversight and Monitoring Daily monitoring, Concurrent online and offline data

Oversight by political leaders

Fortnightly meeting of motivators, regular meeting of master trainers Monitoring at block level by guardian officer, Equitable distribution of blocks among DWSM members for oversight and review

Nanded District Swachhata Plan 29

Activity Plan

No. Activity

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

July

-17

Au

g-17

Sep

t-17

Oct

-17

No

v-17

De

c-17

Implementation responsibility

Monitoring responsibility

A Demand Management

A-1 Strategic planning & prioritization DWSM Dy. CEO WATSAN

A-2 Rolling out ODEP process

1. Planning and preparations for trainings

DWSM Dy. CEO WATSAN

2. Conducting district level training on ODEP

DWSM Dy. CEO WATSAN

3. Conducting block level trainings on ODEP

Master Trainer, Motivators, BRC & DWSM

BDO / Dy. CEO WATSAN

4. Implementation of the planning process in GPs

Motivators & BRC Master Trainer & DWSM

5. Submission and consolidation of plans at block and district level

Motivators & BRC Master Trainer & DWSM

6. Implementation of the plans

Sarpanch & Gramsevak & GP level Functionaries

Master Trainer, BRC & DWSM

7. Monitoring of the process

Champion & Motivator

Master Trainer, BRC & DWSM

A-3 Behaviour change communication

1. Finalization of BCC activities and plan

DWSM Dy. CEO WATSAN

2. Preparation of communication tools/ material

DWSM Dy. CEO WATSAN

Nanded District Swachhata Plan 30

No. Activity

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

July

-17

Au

g-17

Sep

t-17

Oct

-17

No

v-17

De

c-17

Implementation responsibility

Monitoring responsibility

3. Distribution of communication tools/ material

Master Trainer, Motivators, BRC & DWSM

BDO / Dy. CEO WATSAN

4. Home visits

Champion, Motivator, Sarpanch & Gramsevak & GP level Functionaries

Master Trainer & BDO

5. Sharing best practices/ knowledge products

Master Trainer, Motivators, BRC & DWSM

BDO / Dy. CEO WATSAN

A-4 Involvement of elected representatives

1. Involvement of MPs and MLAs Dy. CEO WATSAN CEO

2. Gat (cluster) approach for involvement of ZP members and key district officials

Dy. CEO WATSAN CEO

3. Presentation for ZP members and key district officials @ district level

DWSM Dy. CEO WATSAN

4. Presentation for PS members and Sarpanch @ block level

DWSM Dy. CEO WATSAN

A-5 Involvement of other stakeholders DWSM Dy. CEO WATSAN

B Strengthening the Response Mechanism

B-1 Facilitating strategic push and creating enabling environment

DWSM Dy. CEO WATSAN CEO

B-2 Technical quality

1. Training of village level functionaries

Master Trainer, Motivators, BRC & DWSM

BDO / Dy. CEO WATSAN

Nanded District Swachhata Plan 31

No. Activity

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

July

-17

Au

g-17

Sep

t-17

Oct

-17

No

v-17

De

c-17

Implementation responsibility

Monitoring responsibility

2. Masons training

Master Trainer, Motivators, BRC

BDO / Dy. CEO WATSAN

3. Technical monitoring

Champion, Motivator, Sarpanch & Gramsevak & GP level Functionaries

Master Trainer & BDO

4. Development of sanitation parks Master Trainer BDO / Dy. CEO WATSAN

B-3 Convergence

1. District level inter-departmental meeting

DWSM Dy. CEO WATSAN

2. Aligning to their AIPs HoD Dy. CEO WATSAN /CEO

3. Construction of toilets for additional families

DWSM Dy. CEO WATSAN

4. Repairing defunct toilets DWSM Dy. CEO WATSAN

B-4 HR Development and deployment

1. Transfer of HR to high burden areas DWSM Dy. CEO WATSAN

2. Refresher training to master trainers and motivators

DWSM Dy. CEO WATSAN

3. Involvement of NRLM and MREGS and health department staff

DWSM & HoD Dy. CEO WATSAN / CEO

4. Development of MREGS task force DWSM & MREGS Cell Dy. CEO WATSAN / CEO

5. CB activities at block/ district level

B-4 Supply chain management

1. Making a list of masons, suppliers/ service providers

BRC Master Trainer

Nanded District Swachhata Plan 32

No. Activity

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

July

-17

Au

g-17

Sep

t-17

Oct

-17

No

v-17

De

c-17

Implementation responsibility

Monitoring responsibility

2.

Efforts for involvement and awareness of service providers and suppliers- Creating enabling environment

Master Trainer, Motivators, BRC & DWSM

BDO / Dy. CEO WATSAN

3. Shifting of masons to high burden GPs after making a low burden GPs ODF

BRC & Motivators Master Trainer

4.

Communication with the functionaries and villagers regarding the availability of suppliers/ service providers

BRC & Motivators Master Trainer

B-6 Fund flow

1. Transfer of funds within 10 days from toilet construction

Champion, Motivator, Sarpanch & Gramsevak & GP level Functionaries

Master Trainer & BDO

2. Meetings with companies for CSR DWSM Dy. CEO WATSAN

3. Demand from Swachh Maharashtra Kosh

Dy. CEO WATSAN CEO

C Oversight and Monitoring

1. Daily monitoring based on Social Media

Master Trainer

BDO & Dy. CEO WATSAN

2. Oversight by political leaders

Master Trainer & DWSM

BDO & Dy. CEO WATSAN

3. Concurrent online and offline data

Master Trainer & DWSM

BDO & Dy. CEO WATSAN

Nanded District Swachhata Plan 33

No. Activity

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

July

-17

Au

g-17

Sep

t-17

Oct

-17

No

v-17

De

c-17

Implementation responsibility

Monitoring responsibility

4. Fortnightly meeting of motivators at block level

Master Trainer BDO / Dy. CEO WATSAN

5. Third party monitoring (KRCs, external organizations, task force, flying squads, NSS students, etc.)

DWSM Dy. CEO WATSAN

6. Monitoring at block level by guardian officer

7. Equitable distribution of blocks among DWSM members for oversight and review

Nanded District Swachhata Plan 34

PriMove Pune UNICEF Mumbai

Financial Plan

Sr. No.

Component Rate Total funds required (crore Rs.)

A. Swachh Bharat Mission

IHHL construction for eligible families 12,000 Rs. per IHHL 329.78

Total 2,74,820 IHHLs

IEC + HRD (up to 5% ) 16.49

Revolving fund (up to 5%) 17.31

Administrative expenditure (up to 2%)

7.27

A. Sub -Total 370.85

B. MREGS

IHHL construction for additional families 12,000 Rs. per IHHL 9.24

Total 7,705 IHHLs

B. Sub -Total 9.24

C. Other sources (CSR fund /Own Contribution )

Repairs of Defunct toilets Approx. 8000 Rs per IHHL 8.92

Total 7,437 IHHLs

Relevant IEC/CB SBM funds

C. Sub -Total 8.92

Total (A+B+C) 389.01

Nanded District Swachhata Plan 35

PriMove Pune UNICEF Mumbai

5. ANNEXURE

Annexure 1: List of master trainers and motivators in Nanded district

Annexure 2: GP wise data on status of sanitation

Annexure3: Officials who participated in preparation of this plan

Nanded District Swachhata Plan 36

PriMove Pune UNICEF Mumbai

Annexure 1 List of Master Trainers and Motivators

Master trainers

Sr. No.

Taluka Master Trainer Name Department Designation Contact No.

1 Ardhapur K.H. Gaikwad Panchayat EOP 7709276200

2 Ardhapur Shivling Swami Private Sarpanch 9763630044

3 Bhokar J.D. Gore P.S. BDO 9921139963

4 Bhokar Anil Bilolwar P.S. GS 9423178442

5 Bhokar B.N.Ingale P.S. VDO 9921121513

6 Biloli P.L. Garje P.S. EOP 9423438290

7 Deglur P.M. Kothevad P.S. EOP 9552294603

8 Deglur D.V. Suryawanshi P.S. EOP 9422873251

9 Dharmabad R.D. Jadhav EOP EOP 7385868793

10 Dharmabad S.P. Mirajkar EOP EOP 9423137625

11 Himayatnagar R.D. Skhirsagar Panchayat EOP 7875677711

12 Kandhar

13 Kandhar

14 Kinwat S.V. Yevate Panchayat 8483911052

15 Kinwat Shaikh Latif M. Navaj EOP 9763291785

16 Kinwat D.F. Udatewar EOP 9420095020

17 Kinwat K.V. Renebad EOP 7843006000

18 Loha D.I. Gaikwad Panchayat Extension Officer 9420073238

19 Loha P.G. Kadam CRC CRC 7620018776

20 Mahur Shantilal Rathod Health Health Supervisor 9370236430

21 Mudkhed P.D. Murade P.S. EOP 9881292179

22 Mukhded Nagesh Rahekar SBM CRC 9021414345

23 Mukhded D.N. Chepure P.S. EOP 9404262055

24 Naigaon B.Y. Katkar P.S. EOP 8329217675

25 Naigaon V.R. Ingale P.S. Gramsevak 8421927046

26 Nanded Dilip Bachowar P.S. Extension Officer

27 Nanded Ram Tarate SBM BRC 8600852183

28 Umari D.V. Jogpete P.S. EOP 9422649579

29 Umari Shri Ansari P.S. EOP

Nanded District Swachhata Plan 37

PriMove Pune UNICEF Mumbai

Motivators

Sr. No.

Block Motivator Name Department Designation Contact No.

1 Ardhapur Mr. U.N. Deshmukh Panchayat Gram Vikas Adhikari 8551000551

2 Ardhapur Mr. A.L. Patil Panchayat Gramsevak 7798235725

3 Ardhapur Mr. P.M. Urade Panchayat Gramsevak 7038993381

4 Ardhapur Mr. Ravi Skhirsagar Panchayat Gramsevak 8805550310

5 Ardhapur Mr. V. N. Kolapkar Panchayat Gramsevak 3890581417

6 Ardhapur Mr.U.R. Shinde Panchayat Gramsevak 8888527816

7 Ardhapur Mr. Rathod Panchayat EOE 8275521541

8 Ardhapur Mrs. Kalase Panchayat Anganwadi Supervisor 9096696788

9 Ardhapur Mrs. Gagrgi Swami Panchayat Extension Officer(A) 7588066900

10 Ardhapur Mr.K.N. Shaikh Panchayat Gramsevak 9970539056

12 Ardhapur Mr.Rajeshwar Bhure Panchayat Gram Vikas Adhikari 9423436889

13 Bhokar Mr.V.K. Patil Panchayat Gramsevak 7030128951

14 Bhokar Mr. Dhavale Z.P. Teacher Teacher

15 Bhokar Mr.S.G. Gaikwad Health Health Supervisor 9423305586

16 Bhokar Mr.M.B. Dhage Panchayat Gramsevak 7588067003

17 Bhokar Mr.A.N. Bilolwar Panchayat Gramsevak 9423178442

18 Bhokar Mr.P.P. Suryawanshi Panchayat EOA 9422872961

19 Biloli Mrs. Y.A. Dubukwad ICDS Anganwadi Supervisor 7058407558

20 Biloli Mr.G.A. Giri ICDS Anganwadi Supervisor 8007775656

21 Biloli Mr.G.V. Ugratwar ICDS Anganwadi Supervisor 9420846847

22 Biloli Mr.S.K. Kamble ICDS Anganwadi Supervisor 7709551136

23 Biloli Mr.I.P. Kamble ICDS Anganwadi Supervisor 8975036402

24 Biloli Mr.G.V. Evite ICDS Anganwadi Supervisor 7798966864

25 Biloli Mr.S.D. Shinde Panchayat GS 7709554833

26 Deglur Mrs. Naik Bal Vi. Pra. Adhikari Anganwadi Supervisor 9850477181

27 Deglur Mr.V.S. Bhadekar Panchayat Gram Vikas Adhikari 9421759545

28 Deglur Mr.K.V. Bidve Panchayat Gramsevak 9881185996

29 Deglur Mrs. A. R. Bhutale Bal Vi. Pra. Adhikari 9730394669

30 Deglur Mr.D.K. Totare Ga.Shi. Adhikari EOE 9970826213

31 Deglur Mr.S.G. Chappalwar Panchayat GS 9850086755

32 Deglur Mrs. Vaijanta Bhalerao Bal Vi. Pra. Adhikari Anganwadi Karyakarti 8857028096

33 Deglur Mrs.Anita Gangalwar Bal Vi. Pra. Adhikari Anganwadi Karyakarti 9130196834

34 Deglur Mrs.Indira Mudamwar Bal Vi. Pra. Adhikari Anganwadi Karyakarti 9766718573

35 Deglur Mrs.Lata Kerale Bal Vi. Pra. Adhikari Anganwadi Karyakarti 8605979886

36 Deglur Mr. N.S. Kakade Panchayat Extension Officer(A) 9765284607

37 Deglur Mr. D.V. Kamble Ga.Shi. Extension Officer(E) 9422655683

Nanded District Swachhata Plan 38

PriMove Pune UNICEF Mumbai

Sr. No.

Block Motivator Name Department Designation Contact No.

Adhikari

38 Dharmabad Mr. R.D. Jadhav Panchayat EOP 9421759773

39 Dharmabad Mr. G. S. Kaivare Health MPW 9970509646

40 Dharmabad Mr. D.D. Dankar Health Asha Supervisio 7588381753

41 Dharmabad Mr. R.D. Pachpande Health Agri. Expert 9421838321

42 Dharmabad Mr. Gangasagar Ingale Panchayat Sarpanch 9890152005

43 Dharmabad Mr. Vijay Gangadhar Giri Panchayat Sarpanch 9403495412

44 Dharmabad Mr. Madhav Ingale Panchayat Sarpanch 9527364454

45 Dharmabad Mr. Subhash Lokhande Panchayat Sarpanch 9823538594

46 Dharmabad Mr. Shaikh Ekbal Shadulla Panchayat GP Member

47 Dharmabad Mr. Raosaheb Tingale Panchayat Rojgar Sevak 9158357448

48 Dharmabad Mr. Champatrao Bombale Panchayat GP Member

49 Dharmabad Mr. Bhagwan Wadaje Panchayat EO(sa.) 9158405075

50 Dharmabad Mr. R.M. Lokhande Panchayat EO (IRDP) 9423139671

51 Dharmabad Mr. T.S. Moghal Panchayat EOA 9420671138

52 Dharmabad Mr. S.L. Kendre Panchayat EOA 9421768123

53 Hadgaon Mr. S. M. Dhaval Panchayat BDO 9403067475

54 Hadgaon Mr. K.V. Balwant Assi. BDO 9850695177

55 Hadgaon Mr. B.A. Chavan Panchayat Extension Officer(P) 8275219445

56 Hadgaon Mr. P.J. Tarke Panchayat Extension Officer(P) 8888476177

57 Hadgaon Mr.V.R. Chincholkar Panchayat Extension Officer(A) 7507450100

58 Hadgaon Mr.S.G. Vankhede Panchayat Extension Officer(A) 9657316081

59 Hadgaon Mr.P.B. Shinde Panchayat Extension Officer(A) 9423909086

60 Hadgaon Mrs. Butale Panchayat Supervisor 8390712321

61 Hadgaon Mr. Chavan Madam Panchayat Supervisor 9673314897

62 Hadgaon Mrs. Digraskar Madam Panchayat Supervisor 9970343731

63 Hadgaon Mrs. Girwade Madam Panchayat Supervisor 9011592224

64 Hadgaon Mr. Jarande Madam Panchayat Supervisor 7875200011

65 Hadgaon Mrs. Kendre Madam Panchayat Supervisor 9405424025

66 Hadgaon Mrs. Polawar Panchayat Supervisor 8975623200

67 Hadgaon Mrs. Vankhede Madam Panchayat Supervisor 9421567429

68 Hadgaon Mr.B. Umariwad Panchayat Gramsevak 9623539924

69 Hadgaon Mr. G.R. Chavan Panchayat Gat coordinator 9096746774

70 Hadgaon Mr. Sachin Narayan Hure Panchayat Samuh Coordinator 9405111605

71 Hadgaon Mr. Prakash Baburao Garad Panchayat Samuh Coordinator 8998682353

72 Hadgaon Mrs.Archana Kerba Avate Panchayat Samuh Coordinator 9150764962

73 Himayatnagar Mr. R.D. Skhirsagar Panchayat Extension Officer(P) 7875677711

Nanded District Swachhata Plan 39

PriMove Pune UNICEF Mumbai

Sr. No.

Block Motivator Name Department Designation Contact No.

74 Himayatnagar Mr. N.P. Kale Panchayat Gramsevak 9975580169

75 Himayatnagar Mr. S. G. Shivlad Panchayat Gramsevak 9623250049

76 Himayatnagar Mr. A.K. Kadam Panchayat Gramsevak 7588430574

77 Himayatnagar Mr. G.P. Vankhede Panchayat Gramsevak 9922729876

78 Himayatnagar Mr. Choudhary Sir Education Assi. Teacher

79 Himayatnagar Mr. Gaikwad Sir Education Assi. Teacher

80 Himayatnagar Mr. Panpad Sir Education Assi. Teacher

81 Himayatnagar Mr. R.D. Aramalkar Panchayat Gramsevak 8857837475

82 Himayatnagar Mr. Shrimati Dipendra Panchayat Gramsevak 9860269140

83 Himayatnagar Mr. Shrimati S.K. Gavit Panchayat Gramsevak 9922699197

84 Himayatnagar Mr. A.N. Joshi Panchayat Gram Vikas Adhikari 8805008324

85 Kandhar Mr. Pradip Sontakke Panchayat Extension Officer(P)

86 Kandhar Mr. Gangadhar Kamble Gramsevak Gramsevak

87 Kandhar Mr. V.G. Adampurkar Gramsevak Gramsevak

88 Kandhar Mr. Ganesh Dhondage Panchayat Gramsevak

89 Kandhar Mr. Balasaheb Shinde Panchayat Gramsevak

90 Kandhar Mr. Gopal Tokale Panchayat Gramsevak

91 Kandhar Mr. R.K. Barulkar Panchayat Gramsevak

92 Kandhar Mr. D.B. Khude Panchayat Gramsevak

93 Kandhar Mr. Sunil Jadhav Panchayat Gramsevak

94 Kandhar Mr. Vijay Sontakke Panchayat Gramsevak

95 Kandhar Mr. Mugave Panchayat Gramsevak

96 Kandhar Mrs. S.L. Chinchkar Panchayat Gramsevak

97 Kandhar Mrs. Jadhavar Panchayat Gramsevak

98 Kandhar Mr. M.S. Tembhurne Panchayat Gramsevak

99 Kandhar Mr. Mundkar Panchayat Gramsevak

100 Kandhar Mr. S.D. Gadekar Panchayat Gramsevak

101 Kinwat Mr. V.A. Shimankar Health EOH 9423137838

102 Kinwat Mr. Panchal Gramsevak

103 Kinwat Mr. Tadewar Gramsevak

104 Kinwat Mr. Sanjay Ghumatkar Agriculture EOA

105 Loha Mr. D.P. Dharmekar Panchayat Extension Officer(A) 9423440698

106 Loha Mr. S.T. Shetvar Panchayat Extension Officer(P) 7875289462

107 Loha Mrs. Jayashree Bhosale Agriculture Extension Officer(A) 9423439390

108 Loha Mr. Anil Jondhale Agriculture Extension Officer(A) 8623876173

109 Loha Mr. Sambhaji Dhulgande

Gram Vikas Adhikari Gram Vikas Adhikari 9423655523

110 Loha Mr. Nandedkar Health Extension Officer(H) 9421185098

111 Loha Mr. Kulkarni Health Extension Officer(H) 9420813012

112 Loha Mrs. Swapnali Chavan Panchayat Gramsevak 9766108529

113 Loha Mr. S.H. Aligade BRC BRC 9850327832

114 Loha Mr. P.G. Kadam CRC CRC 7620018776

Nanded District Swachhata Plan 40

PriMove Pune UNICEF Mumbai

Sr. No.

Block Motivator Name Department Designation Contact No.

115 Loha Mr. A.N. Shinde CRC CRC 9527182777

116 Loha Mr. A.B. Bhosale Gramsevak

117 Mahur Mr. S. M. Tellungade P.S. EOP 9921411914

118 Mahur Mr.Shantilal K.Rathod Health Health Supervisor 9970236490

119 Mahur Mr. P.U. Patalewar Health Health Supervisor 9420126989

120 Mahur Mr. Krushna Mane Education Assi. Teacher 7775833350

121 Mahur Mr.S.B. Kamble Education Gat coordinator 7741918233

122 Mahur Mr. S.B. Rekulwar G.P. Laji Sarpanch 9403900900

123 Mahur Mr. Laxman Pahere G.P., Malvaj Sarpanch 7875147949

124 Mahur Mr. V.S. Jadhav G.P., Takali Gramsevak 7588927906

125 Mahur Mr. R.S. Hatkar G.P., Bhala Gramsevak 9822606789

126 Mahur Mr. P.P. Rane G.P., Ruplan Gramsevak 9604953852

127 Mudkhed Mr. Bandawar Gramsevak 9423139689

128 Mudkhed Mr. Balaji Magare Sarpanch

129 Mudkhed Mr. Yashwant Pawar Khujda Rojgar Sevak

130 Mudkhed Mr. Bapurao Jadhav Chilal Tal. Moudha Rojgar Sevak

131 Mudkhed Mr. Mohan Pawar Pangargaon Rojgar Sevak

132 Mudkhed Mr. Dhanu Pawar

Rohi pimpalgaon tanda Sarpanch

133 Mudkhed Mr. S.D. Deshmukh Amdura Gramsevak

134 Mudkhed Mrs. Urmila Pawar Dahegaon Gramsevak

135 Mukhed Mr. Nagesh Swami Panchayat CRC

136 Naigaon Mr. B.Y. Katkar 9860168352

137 Naigaon Mr. V.M. Mundkar 8485015275

138 Naigaon Mr.M.P. Mukhedkar 9421642935

139 Naigaon Mr. M.B. Gite

140 Naigaon Mr. I. M. Gaikwad

141 Naigaon Mr. S.V. Pande Supervisor

142 Naigaon Mr. S.V. Dhavale Supervisor

143 Naigaon Mr. V.K. Kanthewad Supervisor

144 Naigaon Mr. C.V. Padalwar Supervisor

145 Naigaon Mr. S. S. Surangalikar Supervisor

146 Naigaon Mr. V.M. Swami Supervisor

147 Naigaon Mr. S.G. Kamathewad Supervisor

148 Naigaon Mr. M.N. Beg Kendra Pramukh

149 Naigaon Mr. S.B. Shaikh Kendra Pramukh

150 Naigaon Mr. M.G. Kadam Kendra Pramukh 9403456676

151 Naigaon Mr. A.G. Parel Kendra Pramukh 9423306149

152 Naigaon Mr. A.B. Kadam Kendra Pramukh 9890568757

153 Naigaon Mr. B.G. Kamathewad Kendra Pramukh 9423440423

154 Naigaon Mr. L.L. Kanthekar EOE 9420913790

Nanded District Swachhata Plan 41

PriMove Pune UNICEF Mumbai

Sr. No.

Block Motivator Name Department Designation Contact No.

155 Naigaon Mr. B.S. Matavad EOA 9657942945

156 Nanded Mr. R. C. Raut Panchayat BDO 7776024442

157 Nanded Mr. Dilip Bachewar Panchayat Extension Officer 9421869807

158 Nanded Mr. Jeevan Kamble Panchayat Extension Officer 9922843087

159 Nanded Mr. Lakade Agriculture Extension Officer 9604442481

160 Nanded Mr. D.S. Shinde Agriculture Extension Officer

161 Nanded Mr. Aaderaghu Panchayat Extension Officer 9404872493

162 Nanded Mr. D.S. Deshpande Panchayat Extension Officer 7588220105

163 Nanded Mr. S.M. Patil Agriculture Extension Officer

164 Nanded Mr. Veyankatesh Choudhary Education Extension Officer 9405821900

165 Nanded Mr. Parmeshwar Gonare Education Extension Officer 7588082964

166 Nanded Mr. Shobha Bharati Education Extension Officer 9767896134

167 Nanded Mr. Balaji Shinde Education Extension Officer

168 Nanded Mr. Aade Education Extension Officer 9422873248

169 Umari Mr. Yusuf Shaikh Water Supply Sec. Engineer 9420541495

170 Umari Mr. Bansode Panchayat Sec. Engineer

171 Umari Mr. P.M. Kadam Education Kendra Pramukh

172 Umari Mr. A.R. Pande Education Kendra Pramukh

173 Umari Mr. V.M. Waghmare Bal Vikas Supervisor

174 Umari Mr.N.B. Bansode Water Supply

175 Umari Mr.S. U. Gadgile Panchayat Extension Officer(A)

176 Umari Mr.B.D. Kakade Panchayat Extension Officer(S)

177 Umari Mr.Y.P. Supe Panchayat Extension Officer(S)

178 Umari Mr.B.M. Karpe Panchayat Gramsevak 9011411383

179 Umari Mr.D. S. Khule Panchayat Gramsevak 9604061151

180 Umari Mr.R.P. Kendre Panchayat Gram Vikas Adhikari 9403070054

181 Umari Mr.Gulab P. Vadaje Panchayat Gramsevak 7588427809

182 Umari Mrs. S.M. Shende Panchayat Gramsevak 9404732178

183 Umari Mr. A. S. Munge Panchayat Gramsevak 9403519066

184 Umari Mr. N.A. Khansole Panchayat Gramsevak 9403195315

185 Umari Mr. D.G. Kondamangal Panchayat Gramsevak 9823950896

186 Umari Mrs. S. B. Guhe Panchayat Gramsevak 9823556033

187 Umari Mr.S.P. Sonule Panchayat Gramsevak 8275940941

188 Umari Mr.K.U. Rathod Panchayat Gramsevak 9764624195

Nanded District Swachhata Plan 42

Annexure 2 GP wise status of Sanitation

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1 Ardhapur DELUP (KD) 115 7 0 0 ODF

2 Ardhapur KHAIRGAON (BK) 200 104 0 0 ODF

3 Ardhapur LAHAN 688 161 0 0 ODF

4 Ardhapur PIMPALGAON (M) 511 33 0 0

ODF

5 Ardhapur SANGVI (KD) 110 81 0 0 ODF

6 Ardhapur SHAHAPUR 154 17 0 4 ODF 4 Jan-17

7 Ardhapur BARASGAON 383 117 0 6 ODF 6 Jan-17

8 Ardhapur DOUR 102 38 0 6 ODF 6 Jan-17

9 Ardhapur BAMNI 262 99 0 9 ODF 9 Jan-17

10 Ardhapur PARDI (M) 653 130 2 10 ODF 10 Jan-17

11 Ardhapur SHELGAON (BK) 256 43 0 10 ODF 10 Jan-17

12 Ardhapur SHELGAON (KD) 178 53 0 11 ODF 11 Jan-17

13 Ardhapur PANGRI (TK) 124 61 0 12 ODF 12 Jan-17

14 Ardhapur DABHAD 293 107 0 13 ODF 13 Jan-17

15 Ardhapur DHAMDARI 215 68 0 13 ODF 13 Jan-17

16 Ardhapur MENDLA (BK) 159 59 0 17 ODF 17 Jan-17

17 Ardhapur AMRABAD TANDA 144 13 0 19

19 Jan-17

Nanded District Swachhata Plan 43

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

18 Ardhapur SAWARGAON 212 57 0 26 26 Jan-17

19 Ardhapur AMBEGAON 239 32 0 31 31 Jan-17

20 Ardhapur BELSAR 156 23 0 45 30 15 Feb-17

21 Ardhapur JAMBHURUN 209 29 0 49 49 Jan-17

22 Ardhapur DEGAON (BK) 332 167 0 53 25 28 Feb-17

23 Ardhapur GANPUR 365 0 2 55 30 25 Feb-17

24 Ardhapur PATNOOR 222 423 0 57 37 20 Feb-17

25 Ardhapur AMRABAD 109 5 0 61 35 26 Feb-17

26 Ardhapur LONI (BK) 395 16 0 65 30 35 Feb-17

27 Ardhapur DEGAON (K) 355 187 0 74 40 34 Feb-17

28 Ardhapur DIGRAS 255 38 2 86 86 Jan-17

29 Ardhapur LONI (KD) 346 143 0 88 48 40 Feb-17

30 Ardhapur BHOGAON 299 146 0 90 50 40 Feb-17

31 Ardhapur YELEGAON 342 212 0 90 45 45 Feb-17

32 Ardhapur MENDLA (KD) 246 74 0 110 80 30 Feb-17

33 Ardhapur CHENAPUR 348 96 0 115 75 40 Feb-17

34 Ardhapur DELUP (BK) 430 42 0 123 88 35 Feb-17

35 Ardhapur UMARI 418 46 0 137 50 87 Feb-17

36 Ardhapur SHENI 303 41 0 143 60 83 Feb-17

37 Ardhapur KONDHA 810 84 0 360 60 100 200 Mar-17

38 Ardhapur MALEGAON 916 385 0 455 120 140 195 Mar-17

39 Ardhapur KAMTHA (BK) 994 62 0 536 136 200 200 Mar-17

Nanded District Swachhata Plan 44

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

1 Bhokar BATALA 200 0 0 ODF

2 Bhokar KHARBI 156 0 0 ODF

3 Bhokar NANDA BK 190 0 0 ODF

4 Bhokar TATKALWADI 197 1 0 ODF

5 Bhokar SAWARGAON (MAL) 165 0 2

2 Jan-17

6 Bhokar SAMANDERWADI 127 0 6 6 Jan-17

7 Bhokar DORLI (SALWADI) 121 0 9 9 Jan-17

8 Bhokar JAMDARI 172 1 9 9

Jan-17

9 Bhokar KOLGAON BK 161 1 13 13 Jan-17

10 Bhokar HADOLI 237 0 17 17 Jan-17

11 Bhokar WAKAD 238 0 23 23 Jan-17

12 Bhokar KOLGAON (KD) 203 26 36 36 Jan-17

13 Bhokar NARVAT 244 0 38 38 Jan-17

14 Bhokar GARGOTWADI (DESHJNBKH* 120 2

41 41

Jan-17

15 Bhokar JAMBHALI 286 1 43 43 Jan-17

16 Bhokar GARGOTWADI (P) 145 11 46 46 Jan-17

17 Bhokar LAGLUD 241 7 51 20 31 Feb-17

18 Bhokar SONARI 392 0 57 20 20 17 Mar-17

19 Bhokar THERBAN 273 3 57 20 20 17 Mar-17

20 Bhokar SAYAL 179 10 61 15 20 26 Mar-17

Nanded District Swachhata Plan 45

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

21 Bhokar NANDA (KD) 218 47 70 20 25 25 Mar-17

22 Bhokar RAHATI BK 187 2 70 20 25 25 Mar-17

23 Bhokar AMDARI 321 92 79 25 25 29 Mar-17

24 Bhokar ELEGAON 181 0 79 25 25 29 Mar-17

25 Bhokar KHADKI 124 19 79 29 25 25 Mar-17

26 Bhokar JAKAPUR 157 23 81 30 25 26 Mar-17

27 Bhokar NANDA MP 177 1 86 20 35 31 Mar-17

28 Bhokar DHANORA 320 1 91 30 30 31 Mar-17

29 Bhokar DHAWARI (KD) 341 0 94 30 32 32 Mar-17

30 Bhokar DIWASHI KD 264 0 95 30 32 33 Mar-17

31 Bhokar BHURBHUSI 354 0 102 30 40 32 Mar-17

32 Bhokar PAKI 261 1 103 30 40 33 Mar-17

33 Bhokar HASSAPUR 164 0 104 30 42 32 Mar-17

34 Bhokar RAWANGAON 151 1 105 30 40 35 Mar-17

35 Bhokar KAMANGAON 231 0 106 30 41 35 Mar-17

36 Bhokar DHAWARI 214 1 122 40 40 42 Mar-17

37 Bhokar CHINCHALA 188 1 126 40 40 46 Mar-17

38 Bhokar AMTHANA 217 2 130 40 40 50 Mar-17

39 Bhokar PANDURNA 261 1 131 40 40 51 Mar-17

40 Bhokar BALLAL 255 0 135 40 40 55 Mar-17

41 Bhokar MAHAGAON 214 0 141 40 40 61 Mar-17

42 Bhokar RAIKHOD 379 1 144 40 40 64 Mar-17

Nanded District Swachhata Plan 46

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

43 Bhokar DAUR 309 5 151 40 45 66 Mar-17

44 Bhokar BORGAON 326 0 154 40 50 64 Mar-17

45 Bhokar HALDA 500 0 160 40 50 70 Mar-17

46 Bhokar MATUL 290 3 163 40 60 63 Mar-17

47 Bhokar POMNALA 400 4 165 40 60 65 Mar-17

48 Bhokar RENAPUR 263 0 165 40 60 65 Mar-17

49 Bhokar BEMBER 347 6 168 40 60 68 Mar-17

50 Bhokar BENDRI 301 1 169 40 60 69 Mar-17

51 Bhokar SOMTHANA 420 8 178 50 50 78 Mar-17

52 Bhokar DEVTHANA 776 0 180 60 60 60 Mar-17

53 Bhokar NAGAPUR 335 0 191 60 60 71 Mar-17

54 Bhokar CHITGIRI 424 1 197 60 60 77 Mar-17

55 Bhokar LAMKANI 319 0 198 60 60 78 Mar-17

56 Bhokar RITHA 454 5 212 60 70 82 Mar-17

57 Bhokar KANDLI 313 14 215 60 70 85 Mar-17

58 Bhokar BORWADI 295 0 228 60 80 88 Mar-17

59 Bhokar DHARJANI 434 1 245 70 80 95 Mar-17

60 Bhokar SAWARGAON MET 338 0 254

70 90 94 Mar-17

61 Bhokar MOGHALI 396 2 263 80 100 83 Mar-17

62 Bhokar PIMPALDOH 648 6 276 80 100 96 Mar-17

63 Bhokar BHOSI 763 0 344 100 100 144 Mar-17

Nanded District Swachhata Plan 47

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

64 Bhokar DIWASHI (BK) 423 4 348 100 100 148 Mar-17

65 Bhokar KINI 811 1 450 100 150 200 Mar-17

66 Bhokar PALAJ 701 0 473 200 200 73 Mar-17

1 Biloli KHAPARALA 134 0 0

2 Biloli KHATGAON 276 0 0

3 Biloli TAKLI (KH) 85 0 0

4 Biloli HARNALA 78 0 4 4 Jan-17

5 Biloli RAMPUR THADI 76 0 13 3 10 Feb-17

6 Biloli BORGAON THADI 230 0 24 10 10 4 Mar-17

7 Biloli DAGADAPUR 107 0 33 11 11 11 Mar-17

8 Biloli DOULATAPUR 110 39 36 12 12 12 Mar-17

9 Biloli KOUTHA 117 0 36 10 10 16 Mar-17

10 Biloli HAJJAPUR 173 0 59 19 20 20 Mar-17

11 Biloli JIGLA 115 0 62 20 20 22 Mar-17

12 Biloli MUTNYAL 167 0 65 20 22 23 Mar-17

13 Biloli TORNA 162 0 71 20 20 20 11 Apr-17

14 Biloli HARNALI 209 0 74 20 20 20 14 Apr-17

15 Biloli KOLGAON 149 0 74 20 20 20 14 Apr-17

16 Biloli BABHALI (A) 156 0 84 20 20 20 24 Apr-17

17 Biloli BHOSI 250 0 90 20 20 20 30 Apr-17

18 Biloli SHIMPALA 153 3 90 20 20 20 30 Apr-17

19 Biloli HIPPARGA MAAL 285 0 92 22 20 20 30 Apr-17

Nanded District Swachhata Plan 48

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

20 Biloli BIJUR 124 2 103 10 30 30 33 Apr-17

21 Biloli KANGATI 235 1 104 14 30 30 30 Apr-17

22 Biloli RUDRAPUR 233 0 107 17 30 30 30 Apr-17

23 Biloli KAMRASPALLI 196 0 109 19 30 30 30 Apr-17

24 Biloli HINGANI 275 0 122 30 30 30 32 Apr-17

25 Biloli NAGNI 194 1 132 30 30 30 42 Apr-17

26 Biloli POKHARNI 215 13 134 30 30 30 44 Apr-17

27 Biloli BAWALGAON 195 0 150 30 30 30 30 30 May-17

28 Biloli DONGAON (KH) 295 0 150 30 30 30 30 30 May-17

29 Biloli DOUR 279 0 153 33 30 30 30 30 May-17

30 Biloli GALEGAON 205 0 160 30 30 40 40 20 May-17

31 Biloli THADISAWALI 269 0 163 23 30 30 40 40 May-17

32 Biloli GUJARI 247 7 168 28 30 30 40 40 May-17

33 Biloli PACHPIMPLI 371 0 183 30 30 30 40 40 13 Jun-17

34 Biloli KONDALAPUR 214 0 184 30 30 30 40 40 14 Jun-17

35 Biloli CHINCHALA 226 0 186 30 30 30 40 40 16 Jun-17

36 Biloli LAGHUL 272 2 188 30 30 30 40 40 18 Jun-17

37 Biloli KOTGYAL 265 0 190 30 30 30 40 40 20 Jun-17

38 Biloli KINHALA 279 0 197 30 30 30 40 40 27 Jun-17

39 Biloli HUNGUNDA 339 0 200 30 30 30 30 40 40 Jun-17

40 Biloli YESAGI 251 0 201 30 30 30 30 40 41 Jun-17

41 Biloli ARJAPUR 335 0 219 30 30 30 40 44 45 Jun-17

Nanded District Swachhata Plan 49

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

42 Biloli CHIRALI 307 0 224 30 30 30 40 45 49 Jun-17

43 Biloli DUGAON 301 0 231 30 30 40 40 45 46 Jun-17

44 Biloli BAMNI (BK) 290 0 232 30 30 40 40 45 47 Jun-17

45 Biloli BOLEGAON 368 1 233 30 30 40 40 45 48 Jun-17

46 Biloli ADAMPUR 498 0 238 30 30 40 45 45 48 Jun-17

47 Biloli MACHNUR 403 0 248 30 40 40 45 45 48 Jun-17

48 Biloli TALNI 356 0 254 40 40 40 44 45 45 Jun-17

49 Biloli KARLA (KH) 316 0 273 43 45 45 45 45 50 Jun-17

50 Biloli BELKONI (BK) 498 0 275 45 45 45 45 45 50 Jun-17

51 Biloli KARLA (BK) 323 0 276 45 45 45 45 46 50 Jun-17

52 Biloli GANJGAON 377 0 289 45 45 49 50 50 50 Jun-17

53 Biloli PIMPALGAON (KH) 461 0 290

45 45 50 50 50 50 Jun-17

54 Biloli KERUR 400 0 305 50 50 50 50 50 55 Jun-17

55 Biloli ALANDI 390 0 306 50 50 50 50 50 56 Jun-17

56 Biloli HIPPARGA THADI 352 32 306 50 50 50 50 50 56 Jun-17

57 Biloli KUMBHARGAON 392 0 319 50 50 54 55 55 55 Jun-17

58 Biloli MINKI 404 0 319 50 50 54 55 55 55 Jun-17

59 Biloli KESRALI 461 4 321 50 52 54 55 55 55 Jun-17

60 Biloli KASRALI 897 0 327 52 55 55 55 55 55 Jun-17

61 Biloli ANJANI 509 0 346 50 56 60 60 60 60 Jun-17

62 Biloli CHITMOGRA 468 0 355 55 60 60 60 60 60 Jun-17

Nanded District Swachhata Plan 50

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

63 Biloli BELKONI (KH) 482 0 370 60 60 60 60 65 65 Jun-17

64 Biloli GAGALEGAON 462 52 382 60 62 65 65 65 65 Jun-17

65 Biloli DONGAON (BK) 450 0 388 63 65 65 65 65 65 Jun-17

66 Biloli BADOOR 445 0 406 60 66 70 70 70 70 Jun-17

67 Biloli SAGROLI 1784 1074 423 70 70 70 70 70 73 Jun-17

68 Biloli RAMTIRTH 542 0 463 75 75 75 75 80 83 Jun-17

69 Biloli SAWALI 692 0 509 80 80 80 80 90 99 Jun-17

70 Biloli KOLEBORGAON 598 0 524 85 85 85 89 90 90 Jun-17

71 Biloli ATKALI 776 1 531 85 85 90 90 90 91 Jun-17

72 Biloli ARALI 769 0 633 100 100 100 110 110 113 Jun-17

73 Biloli LOHAGAON 1031 0 691 100 101 120 120 120 130 Jun-17

1 Deglur NIPANI SAVARGAON 88 6 0

2 Deglur WANNALI 391 57 5 5 Jan-17

3 Deglur DEVAPUR 209 0 7 7 Jan-17

4 Deglur NAGRAL 134 0 8 8 Jan-17

5 Deglur KATHEWADI 103 0 13 13 Jan-17

6 Deglur KARADKHEDWADI 105 0 19

19 Jan-17

7 Deglur KSHIRSAMUNDRA 163 0 23

23 Jan-17

8 Deglur KARE MALKAPUR 134 1 26 26 Jan-17

Nanded District Swachhata Plan 51

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

9 Deglur HALI 196 0 32 20 12 Feb-17

10 Deglur LINGANKERUR 190 0 37 15 22 Feb-17

11 Deglur CHAKUR 160 0 45 15 15 15 Mar-17

12 Deglur SANGVI KARADKHED 162 0 61

30 31 Feb-17

13 Deglur BORGAON 138 0 63 30 33 Feb-17

14 Deglur AMDAPUR 131 2 66 20 20 26 Mar-17

15 Deglur RAMPUR (PH) 110 0 66 20 25 21 Mar-17

16 Deglur KAREGAON 177 0 67 15 23 29 Mar-17

17 Deglur TAKLI BAGAN 207 6 68 22 20 26 Mar-17

18 Deglur KURUTGI (BK) 134 0 69 10 15 20 24 Apr-17

19 Deglur ANTAPUR 233 0 79 20 30 29 Mar-17

20 Deglur DHOSNI 195 0 85 15 18 23 15 14 May-17

21 Deglur KAVALGADDA 242 0 85 23 14 20 17 11 May-17

22 Deglur KABIRWADI 121 9 89 8 10 15 10 12 14 10 10 Aug-17

23 Deglur HANUMAN HIPPARGA 211 0 96

10 30 56 Mar-17

24 Deglur SUNDGI (BK) 230 19 98 10 20 15 15 20 8 10 Jul-17

25 Deglur MANSHAKARGA 222 13 103 12 23 54 14 Apr-17

26 Deglur ACHEGAON 255 0 104 10 15 12 22 30 5 10 Jul-17

27 Deglur AMBULGA 157 0 104 10 25 15 20 34 May-17

28 Deglur RAMTAPUR 162 0 106 75 31 Feb-17

Nanded District Swachhata Plan 52

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

29 Deglur KEDARKUNTHA 190 0 107 8 10 12 15 10 15 17 20 Aug-17

30 Deglur KAMAJIWADI (SUBHASHNAGAR) 134 0 109

10 15 14 16 20 10 14 10 Aug-17

31 Deglur HAWARGA 186 0 115 15 20 30 20 10 20 Jun-17

32 Deglur WAZARGA 216 0 120 25 30 30 35 Apr-17

33 Deglur TUPSHLGAON 174 1 121 10 15 16 18 25 17 10 10 Aug-17

34 Deglur NANDUR 269 1 140 10 12 14 19 22 10 20 33 Aug-17

35 Deglur SHIVNI 177 0 140 10 15 20 30 25 10 15 15 Aug-17

36 Deglur BHOKASKHEDA 244 0 151 15 20 20 30 30 10 16 10 Aug-17

37 Deglur MUJALGA 275 0 153 15 25 15 30 35 13 20 Jul-17

38 Deglur KUTSHAWADI 250 0 156 20 50 25 31 30 May-17

39 Deglur SOMUR 206 0 159 10 20 20 30 30 9 20 20 Aug-17

40 Deglur TUMBARPALLI 211 0 173 8 25 36 24 30 10 20 20 Aug-17

41 Deglur MANDGI 340 41 182 25 30 20 25 30 10 20 22 Aug-17

42 Deglur KUDLI 233 0 184 10 27 20 30 30 10 27 30 Aug-17

43 Deglur BHAYEGAON 227 6 188 10 50 30 30 25 10 15 18 Aug-17

44 Deglur KUMARPALLI 303 0 188 20 40 30 30 30 10 10 18 Aug-17

45 Deglur DAVANGIR 339 0 192 10 37 30 30 30 10 20 25 Aug-17

46 Deglur KHUTMAPUR 289 0 192 20 24 20 25 28 10 30 35 Aug-17

47 Deglur GOGOTANDA 242 1 194 20 20 24 28 25 10 32 35 Aug-17

48 Deglur MENDANKALLUR 382 0 202 30 40 40 30 50 12 Jul-17

Nanded District Swachhata Plan 53

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

49 Deglur BHAKTAPUR 252 0 206 28 40 40 40 40 8 10 Aug-17

50 Deglur IBRAHIMPUR 326 0 212 53 20 40 40 40 9 10 Jul-17

51 Deglur DAREGAON 275 0 217 20 30 12 40 40 15 20 40 Aug-17

52 Deglur KOTEKALLUR 317 0 237 25 40 19 45 20 18 30 40 Aug-17

53 Deglur HOTAL 291 0 241 25 40 40 60 60 6 10 Jul-17

54 Deglur THADI SVARGAON 317 0 241

20 30 40 50 40 10 21 30 Aug-17

55 Deglur BALLUR 401 0 243 30 50 50 40 60 13 Jul-17

56 Deglur CHAINPUR 369 0 244 30 60 40 60 30 10 4 10 Aug-17

57 Deglur DEGAON (BK) 339 0 249 10 30 40 40 60 9 60 Aug-17

58 Deglur SANGVI UMAR 391 1 254 44 50 30 30 30 10 30 30 Aug-17

59 Deglur MARTOLI 300 0 267 33 40 35 50 60 10 15 24 Aug-17

60 Deglur KINI 332 0 278 30 38 30 60 40 10 40 30 Aug-17

61 Deglur YERGI 396 0 278 30 40 30 38 60 10 30 40 Aug-17

62 Deglur TALKI JAHAGIR 313 1 279 40 30 60 38 30 11 40 30 Aug-17

63 Deglur KOKALGAON 319 0 280 40 60 30 38 30 10 41 31 Aug-17

64 Deglur BALEGAON 400 0 285 40 60 35 30 38 10 30 42 Aug-17

65 Deglur ZARI 404 2 300 35 40 35 40 50 10 45 45 Aug-17

66 Deglur MANUR 378 0 301 45 46 50 35 40 10 35 40 Aug-17

67 Deglur LAKHKHA 394 0 307 30 45 50 45 45 12 45 35 Aug-17

68 Deglur KAWALGAON 477 0 321 45 30 50 50 45 11 45 45 Aug-17

69 Deglur YEDUR 397 0 334 45 50 30 45 50 19 50 45 Aug-17

Nanded District Swachhata Plan 54

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

70 Deglur BHUTAN HIPPARGA 475 3 343

50 60 45 45 50 10 45 38 Aug-17

71 Deglur WAZAR 512 0 347 60 60 60 45 50 12 30 30 Aug-17

72 Deglur BIJALWADI 404 0 353 48 50 60 65 50 10 50 20 Aug-17

73 Deglur NARANGAL (BK) 461 0 359 60 50 60 65 60 6 34 24 Aug-17

74 Deglur SHILVANI 390 2 360 60 65 60 50 60 15 25 25 Aug-17

75 Deglur SUGAON 501 0 376 51 50 45 55 60 20 40 55 Aug-17

76 Deglur KARADKHED 732 3 377 48 50 55 60 60 20 44 40 Aug-17

77 Deglur BEMBRA 396 0 382 50 55 60 60 60 15 42 40 Aug-17

78 Deglur TADKHEL 583 0 395 60 60 55 60 65 15 30 50 Aug-17

79 Deglur ALUR 532 0 405 60 55 60 55 65 20 40 50 Aug-17

80 Deglur WALAG 612 0 430 60 65 65 60 55 15 55 55 Aug-17

81 Deglur GAVANDGAON 456 0 431 60 65 65 60 60 60 32 29 Aug-17

82 Deglur SHEVALA 657 0 453 65 70 60 75 60 55 30 38 Aug-17

83 Deglur MALEGAON (M) 559 0 490 65 70 75 70 65 65 35 45 Aug-17

84 Deglur SHELGAON 757 1 595 80 85 75 70 80 85 50 70 Aug-17

85 Deglur KHANAPUR 947 0 598 85 90 86 78 95 98 30 36 Aug-17

86 Deglur SHAHAPUR 1193 0 626 90 98 95 90 95 92 30 36 Aug-17

87 Deglur MARKHEL 944 0 654 95 96 96 90 98 85 40 54 Aug-17

88 Deglur TAMLUR 898 0 671 105 110 115 90 120 31 55 45 Aug-17

89 Deglur LONI 953 3 792 110 130 140 90 110 45 85 82 Aug-17

90 Deglur HANEGAON 1256 0 938 140 135 130 115 128 15 130 145 Aug-17

Nanded District Swachhata Plan 55

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

1 Dharmabad PATODA (KH) 186 95 0 21 10 10 1 Mar-17

2 Dharmabad CHINCHOLI 214 50 0 23 23 Jan-17

3 Dharmabad MOKLI 96 28 0 27 10 10 7 Mar-17

4 Dharmabad HASNALI 100 25 0 28 22 6 Feb-17

5 Dharmabad BABLI (D) 188 50 0 39 10 10 19 Mar-17

6 Dharmabad BAMNI (TADHI) 135 35 0 41 41 Jan-17

7 Dharmabad SHELGAON (THADI) 159 56 0 42

10 10 10 12 Apr-17

8 Dharmabad MANUR 119 25 0 47 10 10 10 17 Apr-17

9 Dharmabad ALOOR 188 25 1 51 10 10 10 10 11 May-17

10 Dharmabad PATODA (THADI) 255 80 0 55 20 10 10 10 5 May-17

11 Dharmabad VILEGAON (THADI) 109 59 0 64

10 10 10 10 10 14 Jun-17

12 Dharmabad SANGAM 135 55 0 66 10 10 10 10 10 16 Jun-17

13 Dharmabad MASHTI 175 23 0 75 10 10 10 10 10 10 10 5 Aug-17

14 Dharmabad DIGRAS 116 52 7 84 5 5 10 10 5 10 10 10 10 5 4 Nov-17

15 Dharmabad BELLUR (BK) 228 55 0 91 5 5 10 10 5 5 10 10 10 10 11 Nov-17

16 Dharmabad ROSHANGAON 132 55 0 92 5 5 5 5 10 10 10 10 10 5 5 12 Dec-17

17 Dharmabad BABULGAON 189 100 0 95 10 10 10 10 10 10 10 10 10 5 Oct-17

18 Dharmabad SAMRALA 252 56 15 100 10 10 10 10 10 10 10 10 10 10 Oct-17

19 Dharmabad WILEGAON (D) 192 58 0 114 10 10 14 15 15 10 10 10 10 10 Oct-17

20 Dharmabad YELLAPUR 148 52 0 114 10 10 14 15 15 10 10 10 10 10 Oct-17

Nanded District Swachhata Plan 56

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

21 Dharmabad CHONDI 212 55 13 117 10 10 20 20 10 10 10 10 10 7 Oct-17

22 Dharmabad SAIKHED 264 55 0 119 10 10 20 20 10 10 10 10 10 9 Oct-17

23 Dharmabad MAGNALI 221 55 0 135 10 10 20 20 20 10 10 10 10 15 Oct-17

24 Dharmabad KAREGAON 237 50 0 143 10 10 20 20 20 10 10 10 10 10 13 Nov-17

25 Dharmabad BELGUJARI 295 50 0 148 10 10 20 20 20 10 10 10 10 10 18 Nov-17

26 Dharmabad BELLUR (KH) 214 80 0 150 10 10 20 20 20 10 10 15 15 10 10 Nov-17

27 Dharmabad SIRAJKHOD 323 55 0 152 10 10 20 20 20 10 10 15 15 10 12 Nov-17

28 Dharmabad JUNNI 289 50 4 153 10 10 20 20 20 10 10 15 15 10 13 Nov-17

29 Dharmabad CHOLAKHA 192 55 0 154 10 10 20 20 20 10 10 15 15 10 14 Nov-17

30 Dharmabad PATODA (BK) 294 80 0 156 10 10 20 20 20 10 10 15 15 10 16 Nov-17

31 Dharmabad BANNALLI 298 50 2 165 10 10 25 25 20 20 10 10 15 15 5 Nov-17

32 Dharmabad DHANORA (KH) 336 56 0 175 15 15 15 15 10 20 10 20 20 20 15 Nov-17

33 Dharmabad NAIGAON (D) 371 50 0 186 15 15 15 15 15 20 15 20 20 10 26 Nov-17

34 Dharmabad RAJAPUR 372 100 0 186 15 15 15 15 15 20 15 20 10 10 26 10 Dec-17

35 Dharmabad ATALA 398 85 0 191 15 15 15 15 20 20 20 20 20 20 11 Nov-17

36 Dharmabad ATKOOR 286 28 0 196 15 15 15 15 20 20 20 20 20 20 16 Nov-17

37 Dharmabad BACHEGAON 311 25 4 218 15 15 15 15 20 20 20 20 20 20 20 18 Dec-17

38 Dharmabad YEOTI 407 52 0 230 10 10 10 20 20 20 25 25 25 35 30 Nov-17

39 Dharmabad PIMPALGAON (D) 346 55 0 242 15 15 15 15 20 20 20 25 25 25 25 22 Dec-17

40 Dharmabad CHIKNA 519 90 0 247 15 15 15 15 20 20 20 25 25 25 25 27 Dec-17

41 Dharmabad PANGRI 338 100 0 248 15 15 15 15 20 20 20 25 25 25 25 28 Dec-17

42 Dharmabad SALEGAON 405 55 1 297 15 15 20 20 20 20 25 25 25 25 25 62 Dec-17

Nanded District Swachhata Plan 57

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

43 Dharmabad KARKHELI 821 105 10 328 20 20 20 25 25 25 25 40 40 40 30 18 Dec-17

44 Dharmabad YETALA 644 98 185 403 25 25 25 25 50 25 25 50 50 40 40 23 Dec-17

45 Dharmabad JARIKOT 841 101 0 597 25 25 50 50 50 50 50 50 50 70 70 57 Dec-17

1 Hadgaon KANKYACHIWADI 122 122 0 ODF

2 Hadgaon PHALI 76 0 0 ODF

3 Hadgaon RAWANGAON M. 0 0 0 ODF

4 Hadgaon UMRI (KH) 198 0 0 ODF

5 Hadgaon CHENDKAPUR 64 0 4 4 Jan-17

6 Hadgaon KOHALI 475 0 6 6 Jan-17

7 Hadgaon BRAHMAWADI 131 37 10 10 Jan-17

8 Hadgaon MATALA 114 37 16 16 Jan-17

9 Hadgaon BELMANDAL 100 13 20 20 Jan-17

10 Hadgaon SONALA 138 0 25 9 16 Feb-17

11 Hadgaon GAWATWADI 167 8 30 15 15 Feb-17

12 Hadgaon EKRALA 176 5 34 10 10 14 Mar-17

13 Hadgaon WALKI (BK) 259 21 34 34 Jan-17

14 Hadgaon WAKI 258 0 36 20 16 Feb-17

15 Hadgaon KEDARGUDA 201 5 37 37 Jan-17

16 Hadgaon CHAKRI 301 0 38 10 10 18 Mar-17

17 Hadgaon SHIOOR 251 1 40 30 10 Feb-17

18 Hadgaon SHIVNI 177 0 41 10 16 15 Mar-17

19 Hadgaon KHAIRGAON (M) 142 1 44 44 Jan-17

Nanded District Swachhata Plan 58

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

20 Hadgaon KOPRA 171 0 44 44 Jan-17

21 Hadgaon CHORAMBA (BK) 138 0 50 25 25 Feb-17

22 Hadgaon KOLGAON 194 0 53 15 25 13 Mar-17

23 Hadgaon TALYACHIWADI (DHANYACHIWADI) 162 0 53

53 Jan-17

24 Hadgaon DHOTRA 181 0 55 20 15 20 Mar-17

25 Hadgaon BAMNI TANDA 109 0 61 31 30 Feb-17

26 Hadgaon PEWA 324 1 62 40 22 Feb-17

27 Hadgaon LINGAPUR 204 4 71 20 20 31 Mar-17

28 Hadgaon CHABRA TANDA 207 2 75 50 25 Feb-17

29 Hadgaon KOTHALA 266 0 75 30 25 20 Mar-17

30 Hadgaon WAIPHANA (KH) 205 0 78 20 30 28 Mar-17

31 Hadgaon KUSALWADI 164 1 79 25 30 24 Mar-17

32 Hadgaon RAJWADI 212 18 81 11 35 35 Mar-17

33 Hadgaon PANGRI (TA) 216 3 84 20 30 34 Mar-17

34 Hadgaon LHYARI 386 100 85 53 30 2 Mar-17

35 Hadgaon JAGAPUR 214 0 98 30 30 38 Mar-17

36 Hadgaon PIMPARALA 193 0 102 40 40 22 Mar-17

37 Hadgaon SHENDAN 202 0 103 40 40 23 Mar-17

38 Hadgaon CHORAMBA (KH) 181 9 104 40 40 24 Mar-17

39 Hadgaon KARODI 305 0 109 35 35 39 Mar-17

Nanded District Swachhata Plan 59

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

40 Hadgaon SHIVPURI 257 6 116 40 40 36 Mar-17

41 Hadgaon CHIKALA 339 0 120 40 40 40 Mar-17

42 Hadgaon UNCHADA 359 0 121 41 40 40 Mar-17

43 Hadgaon DAGADWADI 154 1 122 22 50 50 Mar-17

44 Hadgaon KALESHWAR 285 13 133 40 50 43 Mar-17

45 Hadgaon MALZARA 277 0 135 69 36 30 Mar-17

46 Hadgaon BAMNI 187 0 139 20 40 79 Mar-17

47 Hadgaon BHATEGAON 283 3 141 41 50 50 Mar-17

48 Hadgaon TARODA 252 0 142 42 50 50 Mar-17

49 Hadgaon KARLA (M) 249 1 143 43 50 50 Mar-17

50 Hadgaon IRAPUR 299 30 154 40 54 60 Mar-17

51 Hadgaon RODGI 307 0 162 62 50 50 Mar-17

52 Hadgaon THAKARWADI 214 0 162 40 40 82 Mar-17

53 Hadgaon GHOGRI 247 0 163 63 50 50 Mar-17

54 Hadgaon DHANORA (T) 340 4 165 65 50 50 Mar-17

55 Hadgaon GURUPHALI 372 0 165 65 50 50 Mar-17

56 Hadgaon LOHA 440 11 169 69 50 50 Mar-17

57 Hadgaon BHANEGAON 332 3 170 70 50 50 Mar-17

58 Hadgaon HADSANI 470 42 174 74 50 50 Mar-17

59 Hadgaon CHINCHGAVAN 319 59 177 77 50 50 Mar-17

60 Hadgaon PANGRI (M) 222 0 180 80 50 50 Mar-17

61 Hadgaon MARLEGAON 266 1 182 82 50 50 Mar-17

Nanded District Swachhata Plan 60

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

62 Hadgaon KANJARA (BK) 352 1 189 89 50 50 Mar-17

63 Hadgaon AMBGAVAN 291 3 191 50 50 91 Mar-17

64 Hadgaon KARMODI 239 0 192 92 50 50 Mar-17

65 Hadgaon KONDUR 370 1 197 97 50 50 Mar-17

66 Hadgaon WALKI (KH) 312 0 198 98 50 50 Mar-17

67 Hadgaon KHARBI 319 1 199 50 50 99 Mar-17

68 Hadgaon WATEGAON 316 0 199 50 99 50 Mar-17

69 Hadgaon WARWAT 374 0 201 75 75 51 Mar-17

70 Hadgaon WADGAON (BK) 306 0 202 75 75 52 Mar-17

71 Hadgaon NEWARI 391 0 208 75 75 58 Mar-17

72 Hadgaon GOJEGAON 329 0 215 75 75 65 Mar-17

73 Hadgaon DIGRAS 258 1 216 75 75 66 Mar-17

74 Hadgaon NEWARWADI 257 0 220 75 75 70 Mar-17

75 Hadgaon MANOLA (BK) 428 0 223 75 75 73 Mar-17

76 Hadgaon JAMBHLA 286 5 225 75 75 75 Mar-17

77 Hadgaon NEWLA 310 0 227 75 75 77 Mar-17

78 Hadgaon MAHATALA 409 0 229 75 75 79 Mar-17

79 Hadgaon DONGARGAON 537 21 230 75 75 80 Mar-17

80 Hadgaon AMBALA 440 1 233 75 83 75 Mar-17

81 Hadgaon SHIBDARA (M) 401 2 237 85 75 77 Mar-17

82 Hadgaon HARDAF 470 0 247 85 87 75 Mar-17

83 Hadgaon NAVA 298 0 257 87 87 83 Mar-17

Nanded District Swachhata Plan 61

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

84 Hadgaon UMRI (D) 356 0 260 87 87 86 Mar-17

85 Hadgaon GORLEGAON 388 1 263 89 87 87 Mar-17

86 Hadgaon SHIRAD 489 0 269 69 100 100 Mar-17

87 Hadgaon MANDVA 464 0 279 100 79 100 Mar-17

88 Hadgaon PIMPALGAON 398 1 284 84 100 100 Mar-17

89 Hadgaon CHABRA 625 1 287 87 100 100 Mar-17

90 Hadgaon BARADSHEWALA 494 34 301 101 100 100 Mar-17

91 Hadgaon DORLI 470 61 302 102 100 100 Mar-17

92 Hadgaon UNCHEGAON (BK) 492 21 303

100 100 103 Mar-17

93 Hadgaon CHORAMBA (N) 531 140 310 100 100 110 Mar-17

94 Hadgaon PATHARAD 499 0 313 113 100 100 Mar-17

95 Hadgaon BANCHINCHOLI 441 1 314 114 100 100 Mar-17

96 Hadgaon ASHTI 764 0 322 122 100 100 Mar-17

97 Hadgaon BABHALI 449 24 323 123 100 100 Mar-17

98 Hadgaon TALEGAON 401 1 329 129 100 100 Mar-17

99 Hadgaon RUI 588 58 332 132 100 100 Mar-17

100 Hadgaon KAWANA 380 0 333 133 100 100 Mar-17

101 Hadgaon UNCHEGAON (KH) 565 0 334

100 134 100 Mar-17

102 Hadgaon GARGAVAN 378 0 340 140 100 100 Mar-17

103 Hadgaon TALANG 550 0 343 100 143 100 Mar-17

Nanded District Swachhata Plan 62

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

104 Hadgaon WAIPHANA (BK) 439 0 353 100 100 153 Mar-17

105 Hadgaon PINGLI 433 5 357 100 157 100 Mar-17

106 Hadgaon RANWANGAON (TA) 681 0 359

100 100 159 Mar-17

107 Hadgaon MARADGA 572 0 368 100 168 100 Mar-17

108 Hadgaon YELAMB 479 1 369 169 100 100 Mar-17

109 Hadgaon UMRI (J) 574 10 370 170 100 100 Mar-17

110 Hadgaon BORGAON (H) 635 82 389 100 189 100 Mar-17

111 Hadgaon SAPTI\ 523 0 394 100 100 194 Mar-17

112 Hadgaon SAWARGAON 534 1 406 100 150 156 Mar-17

113 Hadgaon YEWLI 649 0 423 100 150 173 Mar-17

114 Hadgaon TALNI 1045 1 434 100 150 184 Mar-17

115 Hadgaon PIMPARKHED 632 0 506 100 200 206 Mar-17

116 Hadgaon HALEGAON 556 0 519 100 219 200 Mar-17

117 Hadgaon HASTARA 708 89 535 100 200 235 Mar-17

118 Hadgaon PALSA 874 3 555 150 200 205 Mar-17

119 Hadgaon MANATHA 934 1 556 156 200 200 Mar-17

120 Hadgaon KOLI 705 0 590 190 200 200 Mar-17

121 Hadgaon DHANORA (H) 999 113 699 200 200 299 Mar-17

122 Hadgaon NIMGAON 974 106 762 250 250 262 Mar-17

123 Hadgaon TAMSA 1832 258 934 250 250 434 Mar-17

124 Hadgaon NEWGHA 1450 0 1057 300 300 457 Mar-17

Nanded District Swachhata Plan 63

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

1 Himayatnagar KHAIRGAON (TA) 117 0 57 20 30 7 Mar-17

2 Himayatnagar GHARAPUR 254 0 61 21 30 10 Mar-17

3 Himayatnagar KAMARWADI 146 30 65 15 25 25 Mar-17

4 Himayatnagar PARDI (J) 233 0 68 18 30 20 Mar-17

5 Himayatnagar MAHADAPUR 201 10 85 25 30 30 Mar-17

6 Himayatnagar POTA (KH) 135 0 87 17 35 35 Mar-17

7 Himayatnagar DIGHI 277 0 99 29 35 35 Mar-17

8 Himayatnagar BORGAON (TA) 201 0 102 32 35 35 Mar-17

9 Himayatnagar TEMBHURNI 230 5 106 36 35 35 Mar-17

10 Himayatnagar DAREGAON 151 0 112 35 37 40 Mar-17

11 Himayatnagar JIRONA 191 0 114 38 38 38 Mar-17

12 Himayatnagar KARANJI 308 3 114 64 50 Feb-17

13 Himayatnagar PARWA (BK) 231 0 118 48 35 35 Mar-17

14 Himayatnagar WAGHI 278 1 124 54 35 35 Mar-17

15 Himayatnagar SIRPALLI 357 0 129 39 40 50 Mar-17

16 Himayatnagar JAWALGAON 610 0 133 34 49 50 Mar-17

17 Himayatnagar PARWA (KH) 282 13 139 39 50 50 Mar-17

18 Himayatnagar SAWANA (J) 438 1 142 42 50 50 Mar-17

19 Himayatnagar KANDLI (KH) 200 12 145 35 60 50 Mar-17

20 Himayatnagar EKAMBA 222 0 151 50 60 41 Mar-17

21 Himayatnagar WARANGTAKLI 210 2 174 34 38 32 25 15 15 15 Jul-17

22 Himayatnagar KHAIRGAON (J) 226 0 180 38 42 50 15 10 10 15 Jul-17

Nanded District Swachhata Plan 64

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

23 Himayatnagar WADGAON (J) 326 0 186 36 40 30 20 10 15 35 Jul-17

24 Himayatnagar WATFALI 242 0 191 40 51 25 20 15 15 25 Jul-17

25 Himayatnagar WASHI 306 0 211 40 50 50 21 15 15 20 Jul-17

26 Himayatnagar DOLHARI 376 0 217 47 60 40 15 15 30 10 Jul-17

27 Himayatnagar CHINCHORDI 278 0 219 47 62 40 15 15 30 10 Jul-17

28 Himayatnagar KARLA (P) 443 1 230 49 66 45 15 15 30 10 Jul-17

29 Himayatnagar SHIBADARA (J) 299 1 237 51 66 50 15 15 30 10 Jul-17

30 Himayatnagar EKGHARI 359 0 238 52 66 50 15 15 25 15 Jul-17

31 Himayatnagar ANDHEGAON 460 54 240 50 65 50 15 15 20 25 Jul-17

32 Himayatnagar TEMBHI 340 0 245 60 60 50 15 15 15 30 Jul-17

33 Himayatnagar MANGROOL 418 2 252 50 65 50 15 15 15 30 12 Aug-17

34 Himayatnagar SONARI 428 0 257 50 55 50 15 15 15 30 27 Aug-17

35 Himayatnagar KHADKI (BA) 525 0 266 50 60 54 15 15 15 30 27 Aug-17

36 Himayatnagar WAI 383 0 283 50 60 50 15 15 15 48 30 Aug-17

37 Himayatnagar BORGADI 365 1 299 50 60 50 15 15 15 40 34 20 Sep-17

38 Himayatnagar KAUTHA (J) 404 0 304 50 60 50 15 15 15 40 39 20 Sep-17

39 Himayatnagar PALASPUR 458 3 322 50 60 50 15 15 15 40 40 37 Sep-17

40 Himayatnagar VIRASANI 628 0 330 50 60 50 15 15 15 42 42 41 Sep-17

41 Himayatnagar DABDARI 362 0 333 50 60 50 15 15 15 43 43 42 Sep-17

42 Himayatnagar DHANORA (J) 408 0 344 50 60 50 15 15 15 43 50 46 Sep-17

43 Himayatnagar TAKARALA 497 0 363 50 60 50 15 15 15 40 50 46 22 Oct-17

44 Himayatnagar SIRANJANI 530 0 375 50 60 50 15 15 15 40 50 50 30 Oct-17

Nanded District Swachhata Plan 65

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

45 Himayatnagar KAMARI 716 126 402 50 60 50 15 15 15 40 50 50 30 27 Nov-17

46 Himayatnagar DARESARSAM 495 0 428 50 60 50 15 15 15 40 50 50 30 25 28 Dec-17

47 Himayatnagar KANDLI (BK) 689 128 435 50 60 50 15 15 15 40 50 50 30 30 30 Dec-17

48 Himayatnagar PAWNA 550 0 451 50 60 50 15 15 15 40 50 50 36 35 35 Dec-17

49 Himayatnagar DUDHAD 720 0 452 50 60 50 15 15 15 40 50 50 36 36 35 Dec-17

50 Himayatnagar SARSAM (BK) 681 0 508 50 60 50 15 15 15 40 60 60 60 46 37 Dec-17

51 Himayatnagar POTA (BK) 843 9 553 60 70 50 15 15 15 40 60 60 60 58 50 Dec-17

1 Kandhar GANGANBID 116 1 8 8 Jan-17

2 Kandhar BHANDARKUMTHAYACHIWADI 120 1 16

8 4 4 Mar-17

3 Kandhar SOMTHANA 73 0 18 8 5 5 Mar-17

4 Kandhar BHUTYACHIWADI 144 0 23 5 5 13 Mar-17

5 Kandhar JANGAMWADI 102 0 25 10 10 5 Mar-17

6 Kandhar BHOJUCHIWADI 97 0 29 10 10 9 Mar-17

7 Kandhar GHUBADWADI 59 0 38 10 10 18 Mar-17

8 Kandhar NAWGHARWADI 91 0 47 20 10 17 Mar-17

9 Kandhar IMAMWADI 121 0 48 20 8 20 Mar-17

10 Kandhar CHINCHOLI (PK) 234 1 54 20 14 20 Mar-17

11 Kandhar MARSHIVNI 282 0 68 20 28 20 Mar-17

12 Kandhar GOGDARI 172 0 69 19 25 25 Mar-17

13 Kandhar HANMANTWADI 97 0 71 25 25 21 Mar-17

14 Kandhar GANDHINAGAR 118 0 80 30 20 30 Mar-17

Nanded District Swachhata Plan 66

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

15 Kandhar GUNDA 140 10 80 30 20 30 Mar-17

16 Kandhar BHENDEWADI 154 0 86 36 25 25 Mar-17

17 Kandhar LALWADI 217 0 88 20 20 48 Mar-17

18 Kandhar GUTEWADI 124 0 96 50 25 21 Mar-17

19 Kandhar GULAB WADI 132 0 97 40 17 40 Mar-17

20 Kandhar MUNDEWADI 185 0 99 40 19 40 Mar-17

21 Kandhar TELANGWADI 175 0 100 50 25 25 Mar-17

22 Kandhar NANDANSHIVNI 134 0 112 50 37 25 Mar-17

23 Kandhar SANGAMWADI 170 1 114 50 24 40 Mar-17

24 Kandhar CHOWKI MAHAKAYA 177 1 115

50 15 50 Mar-17

25 Kandhar BALANTWADI 144 0 116 50 16 50 Mar-17

26 Kandhar CHOWKI DHARMAPURI 164 0 118

20 28 70 Mar-17

27 Kandhar HARBAL (PK) 189 0 120 50 20 50 Mar-17

28 Kandhar MANASPURI 364 0 125 50 25 50 Mar-17

29 Kandhar POKHARNI 213 1 128 50 28 50 Mar-17

30 Kandhar RAHATI 191 0 131 50 31 50 Mar-17

31 Kandhar NAWANDIYACHIWADI 175 0 132

50 32 50 Mar-17

32 Kandhar WAKHARAD 192 0 134 50 37 47 Mar-17

33 Kandhar CHIKHALBHUSHI 258 0 138 50 38 50 Mar-17

Nanded District Swachhata Plan 67

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

34 Kandhar KARTALA 212 0 140 50 40 50 Mar-17

35 Kandhar DEOVACHIWADI 208 0 141 50 41 50 Mar-17

36 Kandhar JAKAPUR 184 0 142 50 42 50 Mar-17

37 Kandhar BHUKMARI 198 15 143 50 43 50 Mar-17

38 Kandhar PATALGANGA 215 3 143 50 43 50 Mar-17

39 Kandhar MADALI 177 0 151 25 26 25 25 25 25 Jun-17

40 Kandhar DHARMAPURI MAJRE 249 0 153

25 28 25 25 25 25 Jun-17

41 Kandhar AWARAL 222 0 154 25 29 25 25 25 25 Jun-17

42 Kandhar SAWALESHWAR 250 4 173 25 48 25 25 25 25 Jun-17

43 Kandhar NAWRANGPURA 218 3 174 25 29 25 25 35 35 Jun-17

44 Kandhar RAMA NAIK TANDA 217 7 179

29 29 25 25 26 45 Jun-17

45 Kandhar KHUDYACHIWADI 212 0 182

42 40 25 25 25 25 Jun-17

46 Kandhar BOLKA 270 0 185 45 40 25 25 25 25 Jun-17

47 Kandhar KOTBAZAR 347 0 187 47 40 25 25 25 25 Jun-17

48 Kandhar SHIRUR 341 0 191 50 41 25 25 25 25 Jun-17

49 Kandhar SHIRSHI (KH) 242 2 200 50 25 50 25 25 25 Jun-17

50 Kandhar WANJARWADI 220 0 206 56 25 25 50 25 25 Jun-17

51 Kandhar NARNALI 294 0 208 50 28 25 50 25 30 Jun-17

52 Kandhar LADKA 350 9 224 100 24 25 25 25 25 Jun-17

Nanded District Swachhata Plan 68

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

53 Kandhar MOHIJA 371 7 225 100 25 25 25 25 25 Jun-17

54 Kandhar BABULGAON 335 7 227 100 27 25 25 25 25 Jun-17

55 Kandhar MAHALINGI 308 5 228 100 28 25 25 25 25 Jun-17

56 Kandhar UMERGA (KHO) 300 4 229 100 29 25 25 25 25 Jun-17

57 Kandhar DATALA 284 0 232 100 32 25 25 25 25 Jun-17

58 Kandhar TELUR 294 0 237 100 37 25 25 25 25 Jun-17

59 Kandhar DHANORA KAUTHA 264 0 238

100 38 25 25 25 25 Jun-17

60 Kandhar HIPPERGA SHAHA 312 1 240

100 40 25 25 25 25 Jun-17

61 Kandhar NANDANWAN 303 4 241 100 41 25 25 25 25 Jun-17

62 Kandhar MANSINGWADI 274 0 243 100 43 25 25 25 25 Jun-17

63 Kandhar SANGUCHIWADI 275 0 244 100 44 25 25 25 25 Jun-17

64 Kandhar BAMNI 431 2 250 100 50 25 25 25 25 Jun-17

65 Kandhar BORI (KH) 280 0 250 100 50 25 25 25 25 Jun-17

66 Kandhar DAITHNA 310 0 251 50 25 50 50 26 50 Jun-17

67 Kandhar HATKAYAL 346 0 251 50 25 50 50 26 50 Jun-17

68 Kandhar WARWANT 336 0 252 50 26 50 50 26 50 Jun-17

69 Kandhar HASUL 317 0 259 57 26 50 50 26 50 Jun-17

70 Kandhar GHAGARDARA 350 0 260 60 25 25 50 50 50 Jun-17

71 Kandhar BORI (BK) 350 0 267 40 27 50 50 50 50 Jun-17

72 Kandhar RAUTKHEDA 325 1 267 40 27 50 50 50 50 Jun-17

Nanded District Swachhata Plan 69

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

73 Kandhar BIJEWADI 297 0 270 40 30 50 50 50 50 Jun-17

74 Kandhar BHADARPURA 767 2 271 40 31 50 50 50 50 Jun-17

75 Kandhar SHELALI 328 1 278 40 38 50 50 50 50 Jun-17

76 Kandhar LATH (KH) 449 0 281 40 41 50 50 50 50 Jun-17

77 Kandhar YELLUR 376 3 282 40 42 50 50 50 50 Jun-17

78 Kandhar ALEGAON 370 3 293 50 43 50 50 50 50 Jun-17

79 Kandhar KANDHAREWADI 311 0 295 50 45 50 50 50 50 Jun-17

80 Kandhar KHANDGAON (HAMEED) 361 0 295

50 45 50 50 50 50 Jun-17

81 Kandhar SHEKAPUR 392 0 300 50 50 50 50 50 50 Jun-17

82 Kandhar DAHIKALAMBA 482 0 302 50 50 52 50 50 50 Jun-17

83 Kandhar TALYACHIWADI 402 0 314 50 54 50 50 50 60 Jun-17

84 Kandhar KALKA 405 0 319 55 54 60 50 50 50 Jun-17

85 Kandhar SAWARGAON (NI) 378 0 330

80 50 50 50 50 50 Jun-17

86 Kandhar KALHALI 473 0 334 34 50 50 75 75 50 Jun-17

87 Kandhar GAUL 414 11 344 44 50 50 50 50 100 Jun-17

88 Kandhar MASALGA 413 0 345 45 75 75 50 50 50 Jun-17

89 Kandhar HADOLI (BR) 404 0 346 46 50 50 75 50 75 Jun-17

90 Kandhar SHIRSHI (BK) 412 0 358 50 50 50 50 50 50 25 25 8 Sep-17

91 Kandhar DIGRAS (KH) 441 0 362 40 30 40 40 40 40 50 50 32 Sep-17

92 Kandhar GONAR 500 0 389 50 40 35 35 30 50 50 50 49 Sep-17

Nanded District Swachhata Plan 70

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

93 Kandhar PANSHEWDI 530 0 393 50 50 50 50 25 25 50 50 43 Sep-17

94 Kandhar RUI 460 0 394 44 50 50 50 25 25 50 50 50 Sep-17

95 Kandhar KATKALAMBA 686 0 395 45 50 50 50 50 50 25 25 50 Sep-17

96 Kandhar CHICKLI 443 0 398 40 48 60 50 40 40 40 40 40 Sep-17

97 Kandhar GUNTUR 521 0 401 50 50 50 50 25 25 50 51 50 Sep-17

98 Kandhar PANGRA 708 6 406 56 50 50 50 50 25 25 50 50 Sep-17

99 Kandhar WAHAD 430 2 406 56 50 50 50 50 25 25 50 50 Sep-17

100 Kandhar UMRAJ 538 0 411 50 50 50 50 25 25 50 50 61 Sep-17

101 Kandhar GHODAJ 493 0 454 50 50 50 50 25 25 50 50 104 Sep-17

102 Kandhar MANGNALI 520 0 458 50 50 50 75 75 50 50 25 33 Sep-17

103 Kandhar BACHOTI 651 1 459 50 50 50 75 75 50 50 25 34 Sep-17

104 Kandhar DIGRAS (BK) 946 2 472 50 50 50 75 50 75 25 25 72 Sep-17

105 Kandhar MANGAL SANGVI 694 4 553 50 50 25 50 25 25 25 50 50 25 75 103 Dec-17

106 Kandhar BARUL 932 15 582 50 50 25 25 75 75 50 50 25 50 50 57 Dec-17

107 Kandhar AMBULGA 824 2 589 50 50 50 75 75 50 50 75 25 40 20 29 Dec-17

108 Kandhar PHULWAL 790 1 600 50 50 75 75 50 50 50 50 25 25 50 50 Dec-17

109 Kandhar PANBHUSHI 916 1 613 50 50 75 75 50 50 50 50 50 50 50 13 Dec-17

110 Kandhar HALDA 797 0 648 50 50 75 75 75 75 50 50 25 25 50 48 Dec-17

111 Kandhar KAUTHA 889 2 687 50 50 75 75 75 75 50 50 50 50 40 47 Dec-17

112 Kandhar NAGALGAON 869 0 749 50 75 75 75 75 50 50 50 50 50 75 74 Dec-17

113 Kandhar USMAN NAGAR 1514 0 1185 75 75 75 75 150 150 150 50 150 150 50 35 Dec-17

114 Kandhar KURULA 1545 2 1204 75 75 75 75 150 100 100 100 100 100 150 104 Dec-17

Nanded District Swachhata Plan 71

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

115 Kandhar SHIRADHON 1841 0 1322 100 100 100 100 75 75 75 100 100 150 150 197 Dec-17

116 Kandhar PETHWADAJ 1819 0 1406 100 100 100 150 150 75 100 150 150 150 150 31 Dec-17

1 Kinwat AMDI 125 0 0 ODF

2 Kinwat KANAKWADI 274 0 0 ODF

3 Kinwat PHULENAGAR 107 0 0 ODF

4 Kinwat PIMPALGAON (K) 89 0 0 ODF

5 Kinwat SALAIGUDA 141 24 0 ODF

6 Kinwat BUDHWARPETH 104 0 12 12 Jan-17

7 Kinwat AANJI 116 0 13 13 Jan-17

8 Kinwat BENDI 64 16 17 17 Jan-17

9 Kinwat WALKI (BK) 105 0 25 25 Jan-17

10 Kinwat MADNAPUR (CH) 167 0 32 32 Jan-17

11 Kinwat JARUR 80 0 36 16 20 Feb-17

12 Kinwat DHANORA (S) 79 0 52 20 32 Feb-17

13 Kinwat BHANDARWADI 108 0 63 20 20 23 Mar-17

14 Kinwat GHOGARWADI 105 0 72 20 15 15 22 Apr-17

15 Kinwat SAKRU NA. TANDA 242 16 77

15 20 20 22 Apr-17

16 Kinwat MARLAGUDA 154 0 80 10 20 35 15 Apr-17

17 Kinwat BHULJA 114 0 84 20 15 20 29 Apr-17

18 Kinwat BELLORI (J) 105 0 85 10 20 20 35 Apr-17

19 Kinwat MARAKAGUDA 113 0 88 15 20 20 33 Apr-17

Nanded District Swachhata Plan 72

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

20 Kinwat PANGAR PAHAD 138 0 93 15 20 25 33 Apr-17

21 Kinwat TOTAMBA 101 0 100 10 10 15 20 20 25 Jun-17

22 Kinwat DARSANGVI (CH) 195 11 106 10 15 20 20 25 16 Jun-17

23 Kinwat DIPLA NAIK TANDA 208 0 106

15 15 20 25 31 May-17

24 Kinwat BOTH 120 0 120 15 20 20 20 20 25 Jun-17

25 Kinwat PIMPRI 204 0 123 20 25 30 25 23 May-17

26 Kinwat DABHADI 222 1 132 15 15 25 25 20 32 Jun-17

27 Kinwat PANDHARA 159 0 133 20 15 25 20 25 28 Jun-17

28 Kinwat JARUR TANDA 171 0 136 15 20 20 25 20 36 Jun-17

29 Kinwat SIRPUR 201 0 140 20 30 30 20 20 20 Jun-17

30 Kinwat RODA NA. TANDA 237 6 141

20 20 30 30 41 May-17

31 Kinwat CHIKHALI (E) 193 0 147 20 20 20 40 47 May-17

32 Kinwat PIMPAL SHENDA 151 0 151 25 30 20 25 25 26 Jun-17

33 Kinwat DAYAL DHANORA 239 0 152 30 30 30 25 20 17 Jun-17

34 Kinwat KANCHALI (E) 175 0 153 20 25 30 25 25 28 Jun-17

35 Kinwat RAMPUR 194 1 153 20 25 25 30 25 28 Jun-17

36 Kinwat BHILGAON\ 177 0 161 20 25 25 30 30 31 Jun-17

37 Kinwat MAREGAON (B) 229 0 161 25 25 30 30 51 May-17

38 Kinwat MOHALA 175 0 165 15 20 30 20 25 20 20 15 Aug-17

39 Kinwat IREGAON 170 0 166 15 20 25 20 25 20 20 21 Aug-17

Nanded District Swachhata Plan 73

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

40 Kinwat NANDGAON 279 1 170 20 25 30 25 20 20 30 Jul-17

41 Kinwat MALAKJAM TANDA 227 0 173

10 20 25 25 20 25 20 28 Aug-17

42 Kinwat MALAKJAM 227 0 179 15 20 25 30 30 25 34 Jul-17

43 Kinwat NIRALA 239 0 181 20 25 25 30 20 30 31 Jul-17

44 Kinwat ANDHBORI (E) 232 0 182 20 20 30 30 40 42 Jun-17

45 Kinwat UNAKDEO 231 0 183 15 20 30 25 30 30 33 Jul-17

46 Kinwat WADOLI 219 0 183 20 20 30 30 20 10 20 33 Aug-17

47 Kinwat SAWARI 221 0 185 15 20 25 25 30 30 40 Jul-17

48 Kinwat CHINCHKHED 365 0 187 20 20 30 40 40 37 Jun-17

49 Kinwat MALKAPUR 229 0 187 20 30 30 30 10 10 20 37 Aug-17

50 Kinwat NIRALA TANDA 212 3 191 20 25 30 25 25 10 15 41 Aug-17

51 Kinwat PATODA (KH) 209 1 191 20 20 25 25 30 30 20 21 Aug-17

52 Kinwat GAORI 280 0 199 20 25 30 25 30 20 20 29 Aug-17

53 Kinwat MALAKWADI 235 0 203 20 25 30 25 30 10 10 30 23 Sep-17

54 Kinwat MAREGAON (K) 308 0 203 15 15 30 20 20 25 30 48 Aug-17

55 Kinwat PARDI (S) 263 0 207 20 25 30 25 25 30 30 22 Aug-17

56 Kinwat GONDE MAHAGAON 260 0 212

15 20 20 30 30 20 20 25 32 Sep-17

57 Kinwat BODHADI (BK) 308 0 217 20 15 25 40 30 30 40 17 Aug-17

58 Kinwat DHAMAN DHARI 243 0 218 15 20 20 30 30 20 20 25 20 18 Oct-17

59 Kinwat PIMPAR PHODI 288 0 218 20 25 25 30 30 40 30 18

Aug-17

Nanded District Swachhata Plan 74

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

60 Kinwat SHANIWARPETH 238 0 219 20 20 30 30 30 40 20 29

Aug-17

61 Kinwat BENDI TANDA 341 0 222 15 20 25 20 20 25 25 25 25 22

Oct-17

62 Kinwat PARSARAM NA. TANDA 326 0 222

15 15 20 25 25 20 25 20 20 20 17 Nov-17

63 Kinwat DEVELA TANDA 231 0 224 15 20 20 20 15 20 20 20 20 20 20 14 Dec-17

64 Kinwat PARDHANSANGVI 288 0 224

15 25 25 20 25 20 20 30 20 24 Oct-17

65 Kinwat MANSINGH NAIK TANDA 332 0 225

20 25 25 30 20 10 10 20 25 15 25 Nov-17

66 Kinwat DIGADI (M) 253 0 226 15 20 20 20 25 10 20 20 30 20 26 Nov-17

67 Kinwat KOPRA 334 0 230 20 20 30 30 25 10 20 15 20 20 20 Nov-17

68 Kinwat AMBADI TANDA 276 0 238 15 15 20 15 20 20 25 20 25 25 38 Nov-17

69 Kinwat DIGRAS 429 0 238 20 20 20 30 20 20 20 25 25 38 Oct-17

70 Kinwat GONDJEWALI 268 0 240 10 20 20 25 25 10 15 25 25 25 40 Nov-17

71 Kinwat AMBADI 362 0 241 15 20 20 25 20 15 25 25 30 20 26 Nov-17

72 Kinwat SAWARGAON 382 36 243 15 20 20 25 30 10 20 20 30 30 23 Nov-17

73 Kinwat SINGODA 290 0 247 20 20 25 25 30 15 15 25 25 25 22 Nov-17

74 Kinwat BHIMPUR 264 8 249 20 20 15 20 25 10 20 20 25 25 25 24 Dec-17

75 Kinwat KOTHARI (CH) 283 0 258 20 20 20 25 15 10 20 20 25 25 25 33 Dec-17

76 Kinwat NAGAPUR 325 0 270 20 25 25 30 30 20 15 30 20 35 20 Nov-17

77 Kinwat NANDGAON TANDA 311 0 273

15 20 25 30 30 10 20 30 30 35 28 Nov-17

Nanded District Swachhata Plan 75

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

78 Kinwat KUPTI (KH) 320 0 276 20 20 25 25 30 15 15 25 25 30 30 16 Dec-17

79 Kinwat RAJGAD 298 0 277 20 20 25 25 30 15 15 25 25 25 25 27 Dec-17

80 Kinwat DUNDRA 308 0 278 20 20 25 30 20 25 30 20 30 30 28 Nov-17

81 Kinwat BHISI 398 0 279 15 20 20 25 20 30 20 25 25 30 30 19 Dec-17

82 Kinwat DAHELI TANDA 428 0 281 20 15 20 25 20 10 20 30 30 30 25 36 Dec-17

83 Kinwat DONGARGAON (K) 419 25 281

20 20 30 30 30 10 20 40 25 30 26 Nov-17

84 Kinwat DARSANGVI (S) 285 0 285 20 20 25 25 25 15 20 30 30 40 35 Nov-17

85 Kinwat PARDI (KH) 463 1 287 20 25 25 30 40 10 20 30 25 30 32 Nov-17

86 Kinwat NAGZHARI 360 1 293 20 25 25 30 30 20 20 30 25 25 43 Nov-17

87 Kinwat LONI 335 0 295 20 25 25 30 30 20 30 25 30 25 25 10 Dec-17

88 Kinwat PANGRI 336 0 296 15 15 20 30 30 10 20 30 30 30 25 41 Dec-17

89 Kinwat RAJGAD TANDA 312 0 296 20 15 20 25 25 15 20 30 30 25 25 46 Dec-17

90 Kinwat KUPTI (BK) 345 1 298 20 20 25 25 30 10 20 30 30 30 25 33 Dec-17

91 Kinwat JAWARALA 382 0 299 20 25 25 30 30 10 20 40 25 25 25 24 Dec-17

92 Kinwat WAZHARA (N) 341 1 303 20 20 25 25 30 10 20 30 30 30 30 33 Dec-17

93 Kinwat MALKOLHARI 342 0 307 20 25 25 30 40 10 20 30 25 25 25 32 Dec-17

94 Kinwat MULZARA 355 0 312 15 20 20 25 30 10 20 30 30 40 40 32 Dec-17

95 Kinwat UMRI (B) 442 0 313 20 30 30 40 40 20 30 30 30 25 18 Nov-17

96 Kinwat PAROTI 482 113 332 20 20 30 30 30 10 20 40 30 25 25 52 Dec-17

97 Kinwat BELLORI (DHA) 333 0 333 20 20 30 30 30 10 20 40 30 30 30 43 Dec-17

98 Kinwat KOLHARI 393 0 339 20 25 25 30 30 10 20 30 30 25 30 64 Dec-17

Nanded District Swachhata Plan 76

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

99 Kinwat CHIKHALI (KH) 437 1 350 25 25 30 40 30 10 20 30 40 30 30 40 Dec-17

100 Kinwat PIMPALGAON (S) 405 1 351 20 25 30 40 40 10 30 40 30 30 30 26 Dec-17

101 Kinwat SINDGI (M) 404 0 351 20 25 25 30 40 10 30 40 30 30 25 46 Dec-17

102 Kinwat DAHEGAON (CH) 413 0 353 25 20 25 30 30 10 20 40 30 30 40 53 Dec-17

103 Kinwat KARANJI (E) 364 0 356 20 30 30 40 30 10 20 30 40 40 30 36 Dec-17

104 Kinwat PATHARI 483 0 357 20 30 30 30 40 10 20 40 40 30 30 37 Dec-17

105 Kinwat TEMBI 385 0 357 20 30 30 30 40 10 20 40 40 30 30 37 Dec-17

106 Kinwat KANKI 618 0 358 30 30 30 40 40 10 20 35 35 30 25 33 Dec-17

107 Kinwat RITHA 441 0 362 30 20 30 30 40 10 20 40 40 30 40 32 Dec-17

108 Kinwat DAHELI 524 0 371 30 30 30 30 40 15 25 30 40 30 35 36 Dec-17

109 Kinwat THARA 436 2 375 30 30 40 40 40 20 20 30 30 30 25 40 Dec-17

110 Kinwat YENDA 536 4 382 20 30 25 25 20 20 25 25 30 50 50 62 Dec-17

111 Kinwat KOSMATE 530 0 386 30 30 30 40 40 10 20 40 40 30 40 36 Dec-17

112 Kinwat PATODA (BK) 425 0 389 30 30 40 40 40 10 30 30 40 40 25 34 Dec-17

113 Kinwat LINGI 466 0 411 30 30 40 50 50 20 20 40 40 40 40 11 Dec-17

114 Kinwat TALLARI 474 0 421 30 30 40 50 50 20 20 40 40 40 40 21 Dec-17

115 Kinwat MANDVA (K) 495 0 424 30 30 40 50 50 20 20 40 40 40 40 24 Dec-17

116 Kinwat JALDHARA 537 0 455 30 30 40 50 50 20 20 40 50 50 40 35 Dec-17

117 Kinwat KOTHARI (S) 500 0 455 30 30 40 50 50 20 20 40 50 50 40 35 Dec-17

118 Kinwat KAMTHALA 588 2 468 40 40 40 50 50 40 40 40 40 40 30 18 Dec-17

119 Kinwat MOHPUR 547 0 478 30 40 40 50 50 40 40 40 40 40 30 38 Dec-17

120 Kinwat NICHPUR 545 0 486 30 40 40 40 50 40 40 50 40 30 40 46 Dec-17

Nanded District Swachhata Plan 77

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

121 Kinwat GHOTI 594 0 500 40 40 50 50 50 20 20 40 50 40 50 50 Dec-17

122 Kinwat MALBORGAON 536 0 501 40 40 50 50 50 20 20 40 50 40 50 51 Dec-17

123 Kinwat APPARAOPETH 621 0 512 40 40 50 50 50 20 20 40 40 40 60 62 Dec-17

124 Kinwat PALSHI 659 0 529 40 50 50 60 50 20 20 50 40 50 50 49 Dec-17

125 Kinwat SARKHANI 829 1 533 50 50 40 60 50 20 20 50 60 40 40 53 Dec-17

126 Kinwat ANDHBORI (CHI) 587 0 550 50 50 50 50 50 20 20 50 60 50 50 50 Dec-17

127 Kinwat MANDVI 1035 65 571 50 50 50 50 50 25 25 50 50 50 50 71 Dec-17

128 Kinwat BODHADI (KH) 683 0 580 50 50 50 50 50 30 30 50 50 40 50 80 Dec-17

129 Kinwat CHIKHALI (BK) 724 0 586 50 50 50 50 50 30 30 50 50 50 50 76 Dec-17

130 Kinwat KHAMBALA 741 5 596 50 50 100 50 100 25 25 50 50 50 46 Nov-17

131 Kinwat ISLAPUR 822 0 609 50 50 100 50 100 25 25 50 50 50 59 Nov-17

132 Kinwat SHIVNI 802 0 615 50 50 100 100 50 25 25 50 50 50 65 Nov-17

133 Kinwat GOKUNDA 1733 138 678 50 50 100 100 100 25 25 50 50 50 78 Nov-17

134 Kinwat SINGARWADI 721 0 693 50 50 100 100 100 25 25 50 50 50 93 Nov-17

1 Loha CHINCHOLI (P.O) 93 0 0 ODF

2 Loha KAMLAJ 88 0 3 3 Jan-17

3 Loha MURUMBI 146 0 5 5 Jan-17

4 Loha LANDGEWADI 93 0 19 10 9 Feb-17

5 Loha NAGARWADI 131 8 19 10 9 Feb-17

6 Loha KOLEWADI 239 3 29 10 10 9 Mar-17

7 Loha KABEGAON 98 0 31 11 10 10 Mar-17

8 Loha KAUDGAON 220 1 41 11 15 15 Mar-17

Nanded District Swachhata Plan 78

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

9 Loha ZARI 169 0 45 20 10 15 Mar-17

10 Loha PALSI 171 34 46 16 10 20 Mar-17

11 Loha BORGAON (KOLHA) 146 0 49

10 10 29 Mar-17

12 Loha NANDGAON 142 0 56 10 10 10 16 10 May-17

13 Loha KHARBI 144 0 58 8 13 15 15 7 May-17

14 Loha PIMPRANWADI 129 0 61 11 15 17 12 6 May-17

15 Loha GHUGEWADI 157 0 69 7 9 15 20 18 May-17

16 Loha MADKI 156 0 70 6 10 20 15 19 May-17

17 Loha KANJALA TANDA 97 0 71 7 9 15 20 20 May-17

18 Loha DERLA 256 65 73 9 9 15 20 20 May-17

19 Loha HINDOLA 140 0 75 9 11 15 20 20 May-17

20 Loha HARANWADI 186 0 78 10 13 15 20 20 May-17

21 Loha MANGRUL 169 0 78 10 13 15 20 20 May-17

22 Loha BAMNI (P.U.) 276 46 79 11 13 15 20 20 May-17

23 Loha WALKI (KH) 137 1 80 12 13 15 20 20 May-17

24 Loha BHARASWADA 182 8 82 12 15 15 20 20 May-17

25 Loha SONMANJRI 134 0 82 12 15 15 20 20 May-17

26 Loha KHAMBEGAON 145 1 85 15 15 15 15 15 10 Jun-17

27 Loha HALDAV 155 3 86 15 15 15 15 15 11 Jun-17

28 Loha JOMEGAON 146 0 90 15 15 15 15 15 15 Jun-17

29 Loha DHANORA (S) 162 0 93 15 15 15 15 15 18 Jun-17

Nanded District Swachhata Plan 79

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

30 Loha KAPSI (KH) 163 9 98 15 15 15 15 15 23 Jun-17

31 Loha ANTESHWER 100 0 99 15 15 15 15 16 23 Jun-17

32 Loha PANGRI 135 0 99 15 15 15 15 16 23 Jun-17

33 Loha KADAMACHI WADI 108 3 104

15 15 20 20 20 14 Jun-17

34 Loha POKHRI 173 0 110 15 15 20 20 20 20 Jun-17

35 Loha SHAMBHARGAON 194 0 111

15 16 20 20 20 20 Jun-17

36 Loha DOLARA 146 0 116 16 20 20 20 20 20 Jun-17

37 Loha GOLEGAON (PU) 355 3 118 18 20 20 20 20 20 Jun-17

38 Loha GUNDEWADI 184 1 122 20 20 20 20 20 22 Jun-17

39 Loha DONWADA 196 0 133 20 20 22 22 22 27 Jun-17

40 Loha HARSAD 183 0 133 20 20 22 22 22 27 Jun-17

41 Loha WADGAON 309 0 133 20 20 22 22 22 27 Jun-17

42 Loha WALKEWADI 141 0 133 20 20 22 22 22 27 Jun-17

43 Loha DEOULGAON 283 1 140 20 20 22 22 27 29 Jun-17

44 Loha HIRABORI TANDA 151 2 141 20 20 22 22 28 29 Jun-17

45 Loha AMBESANGVI 258 0 143 20 20 22 22 28 31 Jun-17

46 Loha NILA 261 1 151 18 18 18 18 18 18 18 25 Aug-17

47 Loha PIMPALDARI 181 1 154 18 18 18 18 18 18 21 25 Aug-17

48 Loha KALAMBER (KH) 252 1 155 18 18 18 18 18 19 21 25 Aug-17

49 Loha CHITLI 212 0 156 18 18 18 18 18 20 21 25 Aug-17

Nanded District Swachhata Plan 80

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

50 Loha BHENDEGAON 252 0 157 18 18 18 18 18 21 21 25 Aug-17

51 Loha DHANAJ (BK) 212 0 159 18 18 18 18 18 22 22 25 Aug-17

52 Loha KAREGAON 292 0 170 20 20 20 20 20 22 23 25 Aug-17

53 Loha WAGDERWADI 223 0 170 20 20 20 20 20 22 23 25 Aug-17

54 Loha WALKI (BK) 255 0 170 20 20 20 20 20 22 23 25 Aug-17

55 Loha KHEDKERWADI 202 0 177 20 20 20 20 22 25 25 25 Aug-17

56 Loha DEVLA TANDA 185 0 178 20 20 20 20 23 25 25 25 Aug-17

57 Loha DHANAJ (KH) 246 0 184 20 20 20 24 25 25 25 25 Aug-17

58 Loha HATNI 274 0 186 20 20 21 25 25 25 25 25 Aug-17

59 Loha MASKI 217 0 189 20 20 24 25 25 25 25 25 Aug-17

60 Loha GHOTKA 199 0 192 20 22 25 25 25 25 25 25 Aug-17

61 Loha MARTALA 230 0 194 20 24 25 25 25 25 25 25 Aug-17

62 Loha KIRODA 248 0 198 20 24 25 25 25 25 25 29 Aug-17

63 Loha MAJRESANGVI 235 0 199 20 24 25 25 25 25 25 30 Aug-17

64 Loha SHELGAON (DHA) 311 3 199 20 24 25 25 25 25 25 30 Aug-17

65 Loha LAVRAL 285 0 204 20 20 20 20 20 20 20 20 20 24 Oct-17

66 Loha PARDI 408 1 214 20 20 20 20 20 20 20 24 25 25 Oct-17

67 Loha BORGAON (KIWDA) 303 0 217

20 20 20 20 20 20 22 25 25 25 Oct-17

68 Loha YELI 298 5 222 20 20 20 20 20 22 25 25 25 25 Oct-17

69 Loha KHADAKMANJRI 287 1 224 20 20 20 20 20 24 25 25 25 25 Oct-17

70 Loha PIMPALGAON 291 0 226 20 20 20 20 21 25 25 25 25 25 Oct-17

Nanded District Swachhata Plan 81

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

(AIB)

71 Loha HIPPERGA (CHI) 274 0 227 20 20 20 20 22 25 25 25 25 25 Oct-17

72 Loha RAIWADI 376 0 228 20 20 20 20 23 25 25 25 25 25 Oct-17

73 Loha TAKALGAON 273 6 230 20 20 20 20 25 25 25 25 25 25 Oct-17

74 Loha BERLI (KH) 439 0 232 20 20 20 22 25 25 25 25 25 25 Oct-17

75 Loha BORGAON (AK) 319 0 236 20 20 20 25 25 25 25 25 25 26 Oct-17

76 Loha GAOUNDGAON 280 0 238 20 20 20 25 25 25 25 25 25 28 Oct-17

77 Loha DAPSHED 406 5 240 20 20 20 25 25 25 25 25 25 30 Oct-17

78 Loha DHAKNI 348 0 257 20 20 20 25 25 27 30 30 30 30 Oct-17

79 Loha RAMTIRTH 324 0 257 20 20 20 25 25 27 30 30 30 30 Oct-17

80 Loha CHONDI 332 19 260 20 20 20 25 25 30 30 30 30 30 Oct-17

81 Loha SUGAON 360 0 266 20 20 20 26 30 30 30 30 30 30 Oct-17

82 Loha LONDHESANGVI 332 0 276 20 20 26 30 30 30 30 30 30 30 Oct-17

83 Loha DAGADSANGVI 366 2 278 20 20 25 30 30 30 30 30 30 33 Oct-17

84 Loha PIMPALGAON (DHAGE) 384 3 285

20 20 25 30 30 30 30 30 35 35 Oct-17

85 Loha GOALEGAON (PK) 398 0 288 20 20 20 20 20 25 25 25 25 30 30 28 Dec-17

86 Loha HARBAL (PU) 373 0 289 20 20 20 20 20 25 25 25 25 30 30 29 Dec-17

87 Loha POKHERBHOSI 486 0 294 20 20 20 20 20 25 25 25 25 30 30 34 Dec-17

88 Loha ANDGA 381 0 304 20 20 20 20 25 25 25 30 30 30 30 29 Dec-17

89 Loha WAKA 421 0 305 20 20 20 20 25 25 25 30 30 30 30 30 Dec-17

90 Loha KANJALA 328 0 307 20 20 20 20 25 25 27 30 30 30 30 30 Dec-17

Nanded District Swachhata Plan 82

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

91 Loha SUNEGAON 414 0 326 20 20 20 20 25 25 30 31 35 35 35 30 Dec-17

92 Loha JANAPURI 414 0 329 20 20 20 20 25 25 30 34 35 35 35 30 Dec-17

93 Loha JAWLA (DE) 500 0 338 20 20 20 20 25 25 33 35 35 35 35 35 Dec-17

94 Loha WADEPURI 625 1 351 20 20 20 20 30 30 35 35 35 35 35 36 Dec-17

95 Loha JOSHI SANGVI 370 0 355 20 20 20 20 30 30 35 35 35 35 35 40 Dec-17

96 Loha SAYAL 361 0 359 20 20 20 20 30 30 35 35 35 35 39 40 Dec-17

97 Loha BETSANGVI 508 1 360 20 20 20 20 30 30 35 35 35 35 40 40 Dec-17

98 Loha TELKI 669 0 389 20 20 20 20 34 35 40 40 40 40 40 40 Dec-17

99 Loha ADGAON 483 0 399 20 20 20 20 39 40 40 40 40 40 40 40 Dec-17

100 Loha SHIVNI (J) 501 0 399 20 20 20 20 39 40 40 40 40 40 40 40 Dec-17

101 Loha DAGADGAON 555 0 404 20 20 20 24 40 40 40 40 40 40 40 40 Dec-17

102 Loha DHANORA (MK) 611 0 412 20 20 20 24 40 40 40 40 40 40 40 48 Dec-17

103 Loha LIMBOTI 500 0 432 20 20 20 24 40 40 40 40 40 48 50 50 Dec-17

104 Loha KIWLA (BO) 613 0 438 20 20 20 30 40 40 40 40 40 48 50 50 Dec-17

105 Loha ASHTUR 664 0 454 20 20 20 30 40 40 40 44 50 50 50 50 Dec-17

106 Loha DONGARGAON 477 0 466 20 20 20 30 40 40 46 50 50 50 50 50 Dec-17

107 Loha RISANGAON 613 0 469 20 20 20 30 40 40 49 50 50 50 50 50 Dec-17

108 Loha HADOLI (J) 625 0 495 20 20 20 35 50 50 50 50 50 50 50 50 Dec-17

109 Loha DHAWARI 578 1 511 20 20 21 50 50 50 50 50 50 50 50 50 Dec-17

110 Loha KAPSI (BK) 647 10 518 20 20 28 50 50 50 50 50 50 50 50 50 Dec-17

111 Loha MALEGAON (Y) 644 6 551 20 20 31 50 50 50 50 50 50 60 60 60 Dec-17

112 Loha SAWARGAON (N) 718 0 653 20 20 30 50 50 50 50 70 70 70 70 103 Dec-17

Nanded District Swachhata Plan 83

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

113 Loha SONKHED 1073 59 733 20 20 30 50 50 50 50 90 90 90 90 103 Dec-17

114 Loha SHEWDI (BAJ) 945 0 798 20 50 50 50 50 50 50 90 90 90 90 118 Dec-17

115 Loha KALAMBER (BK) 1229 13 824 20 50 50 50 50 50 50 90 90 90 114 120 Dec-17

116 Loha UMRA 1157 0 1027 27 50 50 50 50 100 100 100 100 100 150 150 Dec-17

117 Loha PENUR 1209 0 1060 27 50 50 50 50 100 100 100 100 133 150 150 Dec-17

118 Loha MALAKOLI 1541 0 1151 28 50 80 80 80 100 100 100 100 133 150 150 Dec-17

1 Mahur BHORWADI 226 0 0 ODF

2 Mahur GOKULNAGAR 0 0 0 ODF

3 Mahur MANDAVA 182 0 0 ODF

4 Mahur SHEKAPUR 135 0 0 ODF

5 Mahur TULSI 110 0 0 ODF

6 Mahur MEDKI 39 0 17 7 10 Feb-17

7 Mahur GOKUL GAUNDGAON 297 2 18

9 9 Feb-17

8 Mahur MALWADA 114 2 18 18 Jan-17

9 Mahur SAVRKHED 125 0 24 10 14 Feb-17

10 Mahur BHAGAVATI 119 21 32 10 12 10 Mar-17

11 Mahur RUPLA NAIK TANDA 110 0 32

10 12 10 Mar-17

12 Mahur TAKLI 280 0 47 13 14 20 Mar-17

13 Mahur WAI PHANI 119 4 47 47 Jan-17

14 Mahur MET 131 0 53 15 18 20 Mar-17

Nanded District Swachhata Plan 84

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

15 Mahur MAHADAPUR 112 0 68 13 27 28 Mar-17

16 Mahur LIMBHAYAT 214 1 72 18 24 30 Mar-17

17 Mahur DIGDI(KU) 110 0 83 15 22 27 19 Apr-17

18 Mahur MURLI 228 0 83 10 20 25 28 Apr-17

19 Mahur SATIGUDA 279 0 85 10 21 25 29 Apr-17

20 Mahur GUNDWAL 152 0 107 17 25 35 30 Apr-17

21 Mahur PACHUNDA 148 0 107 15 28 35 29 Apr-17

22 Mahur WADSA 383 0 107 16 27 32 32 Apr-17

23 Mahur KUPTI 249 1 117 18 29 35 35 Apr-17

24 Mahur HINGNI 210 0 119 15 28 37 39 Apr-17

25 Mahur LANJI 278 0 119 20 28 36 35 Apr-17

26 Mahur BANJARA TANDA 206 0 132 21 29 39 43 Apr-17

27 Mahur TANDALA 275 24 134 22 32 35 45 Apr-17

28 Mahur PADSA 277 2 135 23 34 38 40 Apr-17

29 Mahur ASHTA 292 0 147 30 42 46 29 Apr-17

30 Mahur WASRAM TANDA 236 0 153 20 41 45 47 Apr-17

31 Mahur RUI 287 0 156 25 42 44 45 Apr-17

32 Mahur MUNGASI 194 1 162 27 42 47 46 Apr-17

33 Mahur UMRA 251 0 168 29 45 46 48 Apr-17

34 Mahur SAIFAL 221 0 169 28 46 47 48 Apr-17

35 Mahur SELU 204 0 171 25 48 49 49 Apr-17

36 Mahur CHORAD 226 0 172 27 48 48 49 Apr-17

Nanded District Swachhata Plan 85

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

37 Mahur LOKARWADI 253 0 182 28 49 52 53 Apr-17

38 Mahur SINDKHED 299 0 182 28 49 52 53 Apr-17

39 Mahur PAWANALA 259 0 186 28 49 53 56 Apr-17

40 Mahur WAZARA (SK) 237 0 198 28 55 57 58 Apr-17

41 Mahur DATTAMANJRI 263 0 207 28 58 60 61 Apr-17

42 Mahur MALKAGUDA 297 0 211 29 59 61 62 Apr-17

43 Mahur MALKAGUDA TANDA 310 0 214

28 60 62 64 Apr-17

44 Mahur ANMAL 505 183 215 29 60 62 64 Apr-17

45 Mahur LASANWADI 287 0 216 28 61 62 65 Apr-17

46 Mahur MACHINDRA PARDI 288 10 218

29 60 64 65 Apr-17

47 Mahur SAKUR 358 6 223 28 60 65 70 Apr-17

48 Mahur BHORAD 311 0 230 28 61 65 76 Apr-17

49 Mahur HARDAP 412 0 241 28 50 52 53 58 May-17

50 Mahur IWALESHWAR 274 0 249 28 52 54 56 59 May-17

51 Mahur DIGDI(DHA) 350 0 262 28 57 58 59 60 May-17

52 Mahur ANJANKHED 477 1 265 28 55 58 60 64 May-17

53 Mahur PANOLA 279 0 265 29 54 57 61 64 May-17

54 Mahur HADSNI 520 1 267 28 55 58 60 66 May-17

55 Mahur MADNAPUR 422 0 269 29 54 59 63 64 May-17

56 Mahur WAI (BA) 701 0 280 28 59 62 62 69 May-17

Nanded District Swachhata Plan 86

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

57 Mahur GOUNDWADSA 533 1 293 29 62 65 68 69 May-17

58 Mahur PAPALWADI 440 1 329 30 68 72 75 84 May-17

59 Mahur KARANJI 546 0 453 50 95 100 103 105 May-17

60 Mahur ASOLI 545 5 458 50 98 102 103 105 May-17

61 Mahur LAKHMAPUR 668 0 472 50 100 104 108 110 May-17

62 Mahur WANOLA 559 0 472 50 100 105 107 110 May-17

1 Mudkhed DHANAJ 128 15 0 0 ODF

2 Mudkhed HISSA PATHRAD 108 0 0 0 ODF

3 Mudkhed WADI MUKTAJI 197 0 0 0 ODF

4 Mudkhed WARAD TANDA 87 0 0 0 ODF

5 Mudkhed VAIJAPUR PARDI 225 0 0 5 5 Jan-17

6 Mudkhed JAWALA PATHAK 99 0 0 13 13 Jan-17

7 Mudkhed KHUJDA 198 2 0 19 19 Jan-17

8 Mudkhed MAHATI 182 16 0 29 29 Jan-17

9 Mudkhed TAKLI 117 0 0 35 20 15 Feb-17

10 Mudkhed AMDURA 274 209 0 39 22 17 Feb-17

11 Mudkhed CHIKALA TANDA MOTHA 241 187 0 45

17 9 19 Apr-17

12 Mudkhed BORGAON NADRI 204 12 0 50 15 17 18 Mar-17

13 Mudkhed NAGELI 181 0 0 53 22 31 Feb-17

14 Mudkhed KOLHA 254 28 0 54 11 19 24 Mar-17

15 Mudkhed PANDHARWADI 224 44 0 62 13 15 20 14 Apr-17

Nanded District Swachhata Plan 87

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

16 Mudkhed PARDI VAIJAPUR 284 0 59 62 10 10 9 33 Jun-17

17 Mudkhed GOPALWADI 73 0 0 71 71 Jun-17

18 Mudkhed CHILPIMPRI 219 0 1 77 12 15 15 35 Jun-17

19 Mudkhed WADI MUKTAPUR 175 0 0 78

16 9 14 16 23 Jun-17

20 Mudkhed CHIKALA TANDA LAHAN 85 0 0 81

31 50 Feb-17

21 Mudkhed KHAMBALA 267 0 0 82 7 19 12 11 8 13 12 Jul-17

22 Mudkhed ROHI PIMPALGAON TANDA 256 22 0 85

11 16 10 20 15 13 Jun-17

23 Mudkhed DAREGAON 247 4 1 86 9 12 18 21 10 16 Jun-17

24 Mudkhed JAWALA MURHAR 188 0 0 89

15 20 25 29 Jul-17

25 Mudkhed PANGARGAON 200 19 0 93 10 17 17 20 29 May-17

26 Mudkhed RAJAWADI 134 0 0 95 10 10 22 18 12 12 11 Jul-17

27 Mudkhed PATHRAD 416 0 0 96 9 11 18 18 11 13 10 6 Aug-17

28 Mudkhed DAREGAON WADI 219 4 0 102

15 10 10 27 20 20 Jun-17

29 Mudkhed DEVAPUR 251 0 0 105 15 11 17 19 18 13 12 Jul-17

30 Mudkhed TARKASWADI 238 0 0 108 8 9 15 20 22 25 9 Jul-17

31 Mudkhed HAJAPUR 171 0 1 112 12 9 17 19 19 10 12 14 Aug-17

Nanded District Swachhata Plan 88

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

32 Mudkhed WADI NIYAMATTULLAPUR 335 19 0 122

18 10 20 20 12 12 30 Jul-17

33 Mudkhed WAI 291 0 0 124 10 12 12 18 20 20 19 13 Aug-17

34 Mudkhed PIMPALKAUTHA MAGRE 405 0 0 141

27 13 15 22 25 17 12 10 Aug-17

35 Mudkhed CHIKALA 211 115 0 149 15 20 19 32 28 25 10 Jul-17

36 Mudkhed IJLI 445 153 0 152 25 20 22 30 20 25 10 Jul-17

37 Mudkhed DONGARGAON 382 73 2 172 20 17 28 35 35 14 13 10 Aug-17

38 Mudkhed KAMLAJ 313 65 0 176 18 16 18 28 29 32 19 16 Aug-17

39 Mudkhed PIMPALKAUTHA ( C ) 246 0 0 197

19 15 25 30 40 38 30 Jul-17

40 Mudkhed SHANKTEERTH 205 0 0 203 53 68 82 Mar-17

41 Mudkhed MALKAUTHA 484 223 0 214 25 20 20 35 40 27 27 20 Aug-17

42 Mudkhed SHEMBOLI 501 0 0 217 18 32 30 40 42 38 17 Jul-17

43 Mudkhed SAREGAON 332 0 0 251 15 30 30 40 42 40 39 15 Aug-17

44 Mudkhed NIWAGHA 859 4 0 299 25 35 30 42 45 45 42 35 Aug-17

45 Mudkhed ROHI PIMPALGAON 626 50 0 314

25 35 45 50 50 38 40 31 Aug-17

46 Mudkhed WASRI 358 0 0 335 75 60 100 100 Apr-17

47 Mudkhed MEDHAKA 480 80 0 351 35 29 50 55 57 35 45 45 Aug-17

48 Mudkhed DONGAON 562 115 1 368 25 27 55 55 58 50 50 48 Aug-17

Nanded District Swachhata Plan 89

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

49 Mudkhed MUGAT 1201 78 0 512 40 30 58 60 60 50 65 67 64 18 Oct-17

50 Mudkhed BARAD 1814 0 1 524 50 30 57 60 60 55 57 62 68 25 Oct-17

1 Mukhed GONEGAON 153 0 0 ODF

2 Mukhed HIPPLNARI 121 0 0 ODF

3 Mukhed KOTGYALWADI 129 124 0 ODF

4 Mukhed PANDURNI 336 225 0 ODF

5 Mukhed RAJURA BK TANDA 50 0 0

ODF

6 Mukhed SAWARGAON WADI 110 0 0

ODF

7 Mukhed LONAL 114 4 21 7 7 7 Mar-17

8 Mukhed CHAVAN WADI 121 79 22 7 7 8 Mar-17

9 Mukhed NANDGAON (PK) 160 0 37 5 5 5 5 5 5 5 2 Aug-17

10 Mukhed BHATAPUR (PD) 117 0 40 8 8 8 6 5 5 Jun-17

11 Mukhed KOLGAON 90 0 42 8 8 8 8 8 2 Jun-17

12 Mukhed WANDGIR 185 0 64 8 7 8 7 8 8 8 7 3 Sep-17

13 Mukhed HANGARGA (PM) 209 0 66 9 9 9 9 9 8 8 5 Aug-17

14 Mukhed AWARALA 108 0 67 8 8 8 8 8 9 9 9 Aug-17

15 Mukhed BORGAON 116 25 69 10 10 11 10 10 10 8 Jul-17

16 Mukhed JAMB (KH) 178 0 69 10 10 11 10 10 10 8 Jul-17

17 Mukhed LINGAPUR 104 0 69 10 10 11 10 10 10 8 Jul-17

18 Mukhed CHINCHGAON 107 0 76 10 15 15 10 10 15 1 Jul-17

Nanded District Swachhata Plan 90

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

19 Mukhed TUPDAL (KH) 195 0 78 12 16 15 10 10 15 Jun-17

20 Mukhed BHINGOLI 115 0 82 16 15 16 10 10 15 Jun-17

21 Mukhed PARATPUR 168 0 84 18 16 15 15 10 10 Jun-17

22 Mukhed DONGARGAON 187 0 89 18 18 16 16 11 10 Jun-17

23 Mukhed KABNUR 245 0 91 20 15 15 15 16 10 Jun-17

24 Mukhed BILLALI 396 0 94 15 20 20 15 20 4 Jun-17

25 Mukhed CHIWLI 120 2 94 20 15 20 15 21 3 Jun-17

26 Mukhed ITGYAL (PD) 168 0 94 20 22 24 15 13 May-17

27 Mukhed HIBBAT 199 0 95 21 24 22 15 13 May-17

28 Mukhed TARDALWADI 146 0 96 15 22 16 18 15 10 Jun-17

29 Mukhed BETMOGRA 556 1 98 20 15 18 20 20 5 Jun-17

30 Mukhed KAMBLEWADI 173 1 99 20 18 15 12 18 13 3 Jul-17

31 Mukhed KOLNUR 178 0 99 20 15 15 20 20 9 Jun-17

32 Mukhed BHAGNURWADI 143 0 100 15 15 20 20 20 10 Jun-17

33 Mukhed KOTGYAL 143 0 102 12 15 15 16 16 16 12 Jul-17

34 Mukhed MAKNI 192 0 105 12 15 15 15 20 20 8 Jul-17

35 Mukhed SANGVI BHADEO 182 0 105 12 12 12 15 20 15 19 Jul-17

36 Mukhed ADLOOR (N) 158 0 113 12 13 12 13 20 22 20 1 Aug-17

37 Mukhed SUGAON (KH) 189 0 114 12 13 12 13 20 22 22 Jul-17

38 Mukhed HASNAL (PD) 179 3 118 15 15 20 15 20 15 18 Jul-17

39 Mukhed DORNALI 179 0 119 10 15 20 15 20 15 18 6 Aug-17

40 Mukhed SUGAON (BK) 307 0 121 10 15 19 16 18 17 17 7 2 Sep-17

Nanded District Swachhata Plan 91

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

41 Mukhed RAJURA (KH) 188 20 123 15 10 16 19 17 18 7 19 2 Sep-17

42 Mukhed KHATGAON PD 190 0 124 10 15 19 16 18 17 19 7 3 Sep-17

43 Mukhed HIRANAGAR 178 0 126 5 7 19 17 18 16 19 15 10 Sep-17

44 Mukhed BHENDEGAON (BK) 160 0 129

10 5 17 19 16 18 15 19 10 Sep-17

45 Mukhed BAWANWADI 212 0 132 13 19 15 18 16 19 17 5 10 Sep-17

46 Mukhed BAMNI 264 0 136 17 15 19 19 18 16 10 17 5 Sep-17

47 Mukhed PIMPALKUNTA 229 0 143 14 17 10 16 18 19 19 15 15 Sep-17

48 Mukhed SALGARA (BK) 279 0 148 19 16 10 17 17 15 19 19 16 Sep-17

49 Mukhed TAGYAL 217 0 149 19 19 19 15 17 17 10 16 17 Sep-17

50 Mukhed TANDLI 260 0 150 20 15 19 19 16 10 17 17 17 Sep-17

51 Mukhed JAMBLI 268 31 156 17 17 10 16 19 19 15 20 23 Sep-17

52 Mukhed JIRGA 296 1 156 20 15 20 15 15 15 15 16 15 10 Oct-17

53 Mukhed HATRAL 300 30 159 20 15 20 15 15 20 15 20 15 4 Oct-17

54 Mukhed UMARDARI 278 1 159 15 20 20 15 15 20 15 20 15 4 Oct-17

55 Mukhed KHAIRKA 244 0 164 9 15 20 15 20 15 15 20 20 15 Oct-17

56 Mukhed DEGAON 292 0 165 10 20 15 20 15 20 15 15 15 20 Oct-17

57 Mukhed THOTWADI 244 0 166 16 20 10 20 15 20 20 15 15 15 Oct-17

58 Mukhed HANGARGA (PK) 309 24 167 16 15 20 20 15 20 10 20 16 15 Oct-17

59 Mukhed WADGAON 272 1 167 15 16 20 20 15 20 20 10 15 16 Oct-17

60 Mukhed BENNAL 255 0 169 17 16 20 20 15 20 20 10 15 16 Oct-17

61 Mukhed METHI 255 0 171 18 15 10 20 20 15 20 20 16 17 Oct-17

Nanded District Swachhata Plan 92

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

62 Mukhed UCHA (BK) 249 0 172 18 18 15 10 20 20 15 20 16 20 Oct-17

63 Mukhed UNDRI (PM) 236 2 174 20 20 20 15 15 20 15 15 30 4 Oct-17

64 Mukhed HOKARNA 247 0 177 20 20 25 15 15 20 15 15 30 2 Oct-17

65 Mukhed MAWLI 232 7 178 5 30 15 15 20 15 15 20 23 20 Oct-17

66 Mukhed HASNAL (PM 218 2 179 21 23 20 15 15 20 15 15 30 5 Oct-17

67 Mukhed LADGA 240 0 180 20 20 20 20 20 20 20 15 25 Sep-17

68 Mukhed BAWALGAON 280 7 185 20 25 25 20 25 25 30 10 5 Sep-17

69 Mukhed ANDEGAON 256 0 190 25 25 20 20 20 25 25 20 10 Sep-17

70 Mukhed HODALA 270 0 194 20 25 25 20 25 20 25 20 14 Sep-17

71 Mukhed MANDLAPUR 265 20 198 20 20 20 25 25 25 25 20 18 Sep-17

72 Mukhed BELI (KH) 286 0 201 20 25 25 20 25 25 20 25 16 Sep-17

73 Mukhed SALGARA (KH) 324 45 202 17 25 20 25 25 20 25 25 20 Sep-17

74 Mukhed CHONDI 325 0 203 18 25 25 20 20 25 25 20 25 Sep-17

75 Mukhed BELI (BK) 334 0 204 19 25 25 20 25 25 20 25 20 Sep-17

76 Mukhed KHARAB KHANDGAON 295 0 206

22 19 25 25 20 25 25 20 25 Sep-17

77 Mukhed RAWANKOLA 300 0 207 20 20 20 25 25 25 25 25 22 Sep-17

78 Mukhed BHENDEGAON (KH) 250 0 209

20 20 25 25 25 25 25 25 19 Sep-17

79 Mukhed BOMNALI 264 0 209 19 25 25 25 25 25 25 20 20 Sep-17

80 Mukhed DHANAJ 264 32 215 25 25 25 25 25 25 25 20 20 Sep-17

81 Mukhed LAKHMAPUR 292 0 217 12 25 25 25 25 25 25 25 30 Sep-17

Nanded District Swachhata Plan 93

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

82 Mukhed KUNDRALA 273 0 220 13 20 25 25 25 25 30 30 27 Sep-17

83 Mukhed AKHARGA 463 0 224 17 25 20 25 24 26 27 35 25 Sep-17

84 Mukhed KAMJALGA 294 7 227 21 25 20 25 24 26 27 33 26 Sep-17

85 Mukhed SHIKARA 246 0 229 25 25 25 20 20 25 20 25 44 Sep-17

86 Mukhed KERUR 434 0 231 25 25 20 25 25 20 25 20 46 Sep-17

87 Mukhed KARNA 377 0 234 25 25 25 25 25 25 30 30 24 Sep-17

88 Mukhed NIWLI 341 2 234 24 35 25 25 25 25 25 25 25 Sep-17

89 Mukhed WALANKI 278 0 234 24 30 25 25 25 25 25 25 30 Sep-17

90 Mukhed KALAMBER 338 0 235 25 25 30 25 25 25 25 25 30 Sep-17

91 Mukhed MARAJWADI 281 0 235 25 25 30 30 25 25 25 25 25 Sep-17

92 Mukhed MANGYAL 302 34 238 25 28 30 30 25 25 25 25 25 Sep-17

93 Mukhed WARTALA 364 12 241 28 30 28 25 30 25 25 26 24 Sep-17

94 Mukhed BASWADI 328 0 249 32 26 25 25 30 25 28 30 28 Sep-17

95 Mukhed DHAMANAON 428 0 251 34 25 26 30 25 28 25 28 30 Sep-17

96 Mukhed HIPPERGA (DE) 306 0 251 34 25 26 30 25 28 25 28 30 Sep-17

97 Mukhed RAVI 496 1 255 34 28 25 30 30 30 30 30 18 Sep-17

98 Mukhed MANJRI 337 0 257 20 30 30 30 30 30 25 28 34 Sep-17

99 Mukhed SANGVI BENAK 354 0 258 21 30 30 30 30 30 34 28 25 Sep-17

100 Mukhed SAWARMAL 398 10 258 25 28 34 30 30 30 30 30 21 Sep-17

101 Mukhed MOTARGA 410 1 267 30 30 30 30 30 30 30 30 27 Sep-17

102 Mukhed RAWANGAON 339 0 271 31 30 30 30 30 30 30 30 30 Sep-17

103 Mukhed KHATGAON (PM) 361 0 288 47 30 30 30 30 30 30 30 31 Sep-17

Nanded District Swachhata Plan 94

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

104 Mukhed BAPSHETWADI 398 36 294 30 30 30 30 30 30 30 30 54 Sep-17

105 Mukhed HALNI 430 0 339 40 40 40 40 40 40 40 40 19 Sep-17

106 Mukhed UNDRI (PD) 439 52 363 40 40 40 40 40 40 40 40 43 Sep-17

107 Mukhed WASOOR 464 0 364 50 40 40 40 40 40 50 40 24 Sep-17

108 Mukhed SAKNUR 449 4 367 50 40 40 40 40 40 50 40 27 Sep-17

109 Mukhed ITGYAL (PM) 431 0 368 28 40 40 40 50 50 40 40 40 Sep-17

110 Mukhed SAWARGAON (PEER) 500 0 372

40 40 40 40 40 40 40 40 52 Sep-17

111 Mukhed SAWALI 402 0 375 40 40 40 40 40 40 40 40 55 Sep-17

112 Mukhed DAPKA RAJA 619 0 414 50 50 50 50 50 50 50 50 14 Sep-17

113 Mukhed AMBULGA (BK) 558 21 419 50 50 50 50 50 50 50 50 19 Sep-17

114 Mukhed EKLARA 643 56 458 50 50 50 50 50 50 50 50 58 Sep-17

115 Mukhed RAJURA (BK) 615 3 471 60 60 60 60 60 60 60 30 21 Sep-17

116 Mukhed GOJEGAON 649 0 474 60 60 60 60 60 60 60 30 24 Sep-17

117 Mukhed PALA 644 1 477 60 60 60 60 60 60 60 30 27 Sep-17

118 Mukhed JAHUR 624 4 479 60 60 60 60 60 60 60 30 29 Sep-17

119 Mukhed HONWADAJ 690 0 487 60 60 60 60 60 60 60 30 37 Sep-17

120 Mukhed SHIRUR DABDE 616 37 512 70 70 70 70 70 70 70 11 11 Sep-17

121 Mukhed BARAHALI 1122 0 552 70 70 70 70 70 70 70 22 40 Sep-17

122 Mukhed DAPKA GUNDOPANT 868 0 568

70 70 70 70 70 70 70 70 8 Sep-17

123 Mukhed JUNNA 714 0 570 70 70 70 70 70 70 70 70 10 Sep-17

Nanded District Swachhata Plan 95

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

124 Mukhed MUKRAMABAD 1246 4 575 70 70 70 70 70 70 70 70 15 Sep-17

125 Mukhed CHANDOLA 878 7 673 80 80 80 80 80 80 80 80 33 Sep-17

126 Mukhed JAMB (BK) 902 44 770 90 90 90 90 90 90 90 90 50 Sep-17

127 Mukhed YEWTI 1095 98 878 100 100 100 100 100 100 100 100 78 Sep-17

1 Naigaon MANUR (TB) 213 0 0

2 Naigaon PARADWADI 109 0 0

3 Naigaon SHELGAON (GAURI) 297 3 1

1 Jan-17

4 Naigaon CHARWADI 99 0 14 14 Jan-17

5 Naigaon MOKASDARA 222 4 17 7 10 Feb-17

6 Naigaon MANDANI 109 0 19 19 Feb-17

7 Naigaon TAKLI (TB) 110 0 26 26 Feb-17

8 Naigaon NILEGAVAN 119 1 37 10 7 20 Mar-17

9 Naigaon TALBID 160 0 56 26 30 Feb-17

10 Naigaon MARWALI TANDA 133 0 66

66 Feb-17

11 Naigaon KAHALA (KH) 314 0 70 20 20 30 Mar-17

12 Naigaon DONGARGAON 260 0 72 15 14 16 17 10 May-17

13 Naigaon KEDARWADGAON 265 0 80

30 30 20 Mar-17

14 Naigaon MELGAON 153 13 83 25 25 33 Mar-17

15 Naigaon NARANGAL 180 0 87 22 22 28 15 Apr-17

Nanded District Swachhata Plan 96

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

16 Naigaon KOKALEGAON 352 0 90 21 26 23 10 10 May-17

17 Naigaon TAKBID 237 2 90 24 27 29 10 Apr-17

18 Naigaon RAJGADNAGAR 205 0 92 18 17 25 15 17 May-17

19 Naigaon HOTALA 433 197 106 17 13 25 27 13 11 Jun-17

20 Naigaon GADGA 335 149 109 18 12 27 25 11 16 Jun-17

21 Naigaon KANDALA 201 0 110 22 16 13 24 25 10 Jun-17

22 Naigaon NAWANDI 321 0 117 17 16 22 18 25 19 Jun-17

23 Naigaon MUSTAPUR 195 0 121 39 41 41 Mar-17

24 Naigaon RANSUGAON 244 2 122 41 39 42 Mar-17

25 Naigaon RUI (KH) 282 17 122 45 38 39 Mar-17

26 Naigaon LALWANDI 422 112 126 39 42 45 Mar-17

27 Naigaon DHANAJ 223 3 130 40 43 47 Mar-17

28 Naigaon HUSSA 284 0 138 35 36 33 34 Apr-17

29 Naigaon SALEGAON (KH) 392 0 141 42 53 46 Mar-17

30 Naigaon KHANDGAON 244 0 143 42 45 56 Mar-17

31 Naigaon ALUWADGAON 372 0 147 42 38 67 Mar-17

32 Naigaon DHUPA 331 0 148 45 55 48 Mar-17

33 Naigaon ANCHOLI 286 35 152 35 42 38 37 Apr-17

34 Naigaon HANGARGA 282 0 152 32 35 30 28 27 May-17

35 Naigaon TAKLI (TM) 245 1 163 34 32 30 29 38 May-17

36 Naigaon KOTHALA 234 0 167 33 32 39 35 28 May-17

37 Naigaon SUJLEGAON 491 9 167 55 65 47 Mar-17

Nanded District Swachhata Plan 97

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

38 Naigaon IEKALI (MAL) 235 0 175 32 35 38 36 34 May-17

39 Naigaon SHELGAON (CH) 310 0 196 39 38 42 44 33 May-17

40 Naigaon SATEGAON 319 13 206 42 47 55 62 Apr-17

41 Naigaon BHOPALA 353 0 208 55 85 68 Mar-17

42 Naigaon KHAIRGAON 346 1 210 22 35 55 65 33 May-17

43 Naigaon HIPPARGA (J) 331 0 211 32 35 40 50 54 May-17

44 Naigaon WANJARWADI 304 0 212 32 35 75 70 Apr-17

45 Naigaon GODAMGAON 438 13 219 22 55 45 65 32 May-17

46 Naigaon DEREGAON 296 0 223 35 45 55 65 23 May-17

47 Naigaon KARLA (TM) 325 0 225 32 42 55 45 51 May-17

48 Naigaon GOLEGAON 308 0 226 80 85 61 Mar-17

49 Naigaon BENDERI 403 0 231 22 35 55 65 54 May-17

50 Naigaon BALEGAON 296 0 238 35 65 68 70 Apr-17

51 Naigaon SOMTHANA 426 0 245 35 45 40 50 75 May-17

52 Naigaon PALASGAON 379 0 249 35 52 42 55 65 May-17

53 Naigaon PATODA (TB) 387 0 255 30 40 55 65 65 May-17

54 Naigaon AURALA 318 6 259 34 75 65 85 Apr-17

55 Naigaon IJATGAON (BK) 365 0 274 35 39 65 75 60 May-17

56 Naigaon VAJIRGAON 448 0 280 35 35 85 70 55 May-17

57 Naigaon SAWARKHEDA 542 5 282 70 90 62 60 Apr-17

58 Naigaon BETAKBILOLI 420 0 291 35 45 65 61 85 May-17

59 Naigaon DHANORA (TM) 441 2 304 35 55 75 65 74 May-17

Nanded District Swachhata Plan 98

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

60 Naigaon SANGVI 442 0 314 62 64 68 65 55 May-17

61 Naigaon RUI (BK) 455 6 349 60 80 98 61 50 May-17

62 Naigaon GHUNGRALA 560 0 366 35 45 55 65 75 91 Jun-17

63 Naigaon KUNCHALI 452 2 367 32 52 65 75 98 45 Jun-17

64 Naigaon TAKLI (BK) 536 0 381 38 78 98 88 79 May-17

65 Naigaon DEGAON 664 11 383 38 65 95 85 100 May-17

66 Naigaon RAHER 572 0 395 39 79 99 80 98 May-17

67 Naigaon MUGAON 692 129 408 65 75 85 65 60 58 Jun-17

68 Naigaon MARWALI 670 2 416 75 95 85 72 89 May-17

69 Naigaon IEKALI (MOR) 554 0 425 66 67 78 80 85 49 Jun-17

70 Naigaon RATOLI 609 0 435 35 75 78 88 68 50 41 Jul-17

71 Naigaon ANTERGAON 657 2 438 35 65 78 78 75 78 29 Jul-17

72 Naigaon PIMPALGAON 651 0 439 40 65 75 78 68 55 58 Jul-17

73 Naigaon KAHALA (BK) 555 19 447 55 80 75 88 98 51 Jun-17

74 Naigaon KOLAMBI 774 0 535 63 95 98 99 95 85 Jun-17

75 Naigaon NARSI 1563 12 577 47 85 95 95 80 85 90 Jul-17

76 Naigaon KUSHNUR 899 7 598 45 75 91 95 75 88 60 69 Aug-17

77 Naigaon TEMBURNI 757 0 613 35 78 98 98 95 85 75 49 Aug-17

78 Naigaon KUNTUR 1222 0 641 55 85 95 98 88 93 65 62 Aug-17

79 Naigaon BARBADA 1102 1 769 98 98 95 99 93 98 98 90 Aug-17

80 Naigaon MANJARAM 1844 0 1282 60 180 180 195 190 185 192 100 Aug-17

1 Nanded BONDAR (N) 124 0 0

Nanded District Swachhata Plan 99

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

2 Nanded DHOKI 273 0 0

3 Nanded GANGABETH 136 0 0

4 Nanded GUNDEGAON 160 0 0

5 Nanded KHUPSARWADI 130 0 0

6 Nanded KOTI TIRTH 157 1 0

7 Nanded NAGAPUR 111 0 0

8 Nanded PIMPALGAON (N) 199 0 0

9 Nanded SOMESHWAR 181 0 0

10 Nanded CHIMEGAON 102 0 11 11 Jan-17

11 Nanded CHIKHLI (KH) 144 5 17 17 Jan-17

12 Nanded KALHAL 143 0 20 20 Jan-17

13 Nanded PASADGAON 317 0 28 28 Jan-17

14 Nanded DHANGARWADI 124 0 33 19 14 Feb-17

15 Nanded POKHARNI 71 0 33 20 13 Feb-17

16 Nanded THUGAON 123 0 37 15 17 5 Mar-17

17 Nanded BHANGI 121 0 39 10 19 10 Mar-17

18 Nanded FATHEPUR 170 0 39 10 19 10 Mar-17

19 Nanded KIKI 148 0 40 25 15 Feb-17

20 Nanded PANGRI (A) 210 0 41 20 21 Feb-17

21 Nanded JAITAPUR 185 0 50 50 Jan-17

22 Nanded GADEGAON 162 0 55 15 15 25 Mar-17

23 Nanded SIDHNATH 105 0 57 10 15 25 7 Apr-17

Nanded District Swachhata Plan 100

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

24 Nanded RAHEGAON 141 0 61 61 Jan-17

25 Nanded MARKAND 283 0 65 15 25 25 Mar-17

26 Nanded DARYAPUR 108 0 89 15 20 30 24 Apr-17

27 Nanded TRIKUT 158 0 90 15 15 15 20 25 May-17

28 Nanded CHICKLI (BK) 254 0 92 40 30 22 Mar-17

29 Nanded WAHEGAON 133 0 93 15 25 30 23 Apr-17

30 Nanded BHAYEGAON 225 0 94 94 Jan-17

31 Nanded PIMPALGAON (M) 117 0 100

15 30 30 25 Apr-17

32 Nanded DHANORA 186 0 107 20 25 25 37 Apr-17

33 Nanded ALEGAON 281 0 111 40 35 36 Mar-17

34 Nanded KHURGAON 238 0 112 15 30 25 30 12 May-17

35 Nanded SAYAL 210 0 113 18 32 30 20 13 May-17

36 Nanded WADI (PUYAD) 178 0 119 15 25 35 24 20 May-17

37 Nanded NERLI 257 0 121 30 35 40 16 Apr-17

38 Nanded INJEGAON 184 0 140 20 25 40 25 30 May-17

39 Nanded PIMPRI (M) 240 1 143 25 30 25 30 33 May-17

40 Nanded BONDAR (H) 222 0 145 35 30 40 40 Apr-17

41 Nanded WADAWANA 238 0 148 45 35 30 38 Apr-17

42 Nanded PUYANI 300 0 150 28 32 40 50 Apr-17

43 Nanded BORGAON (T) 202 0 159 159 Jan-17

44 Nanded KHADKUT 241 0 162 25 25 30 40 35 7 Jun-17

Nanded District Swachhata Plan 101

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

45 Nanded PUNEGAON 238 0 164 20 30 35 25 30 24 Jun-17

46 Nanded KAMTHA (KH) 315 0 175 25 35 45 45 25 May-17

47 Nanded SUGAON (BK) 273 0 184 20 25 30 30 35 30 14 Jul-17

48 Nanded PIMPALGAON (K) 373 0 185 20 55 55 55 Apr-17

49 Nanded WANEGAON 222 0 188 35 40 40 50 23 May-17

50 Nanded BRAHAMANWADA 272 0 204

15 25 25 30 30 35 30 14 Aug-17

51 Nanded NALESHWAR 442 0 210 35 45 50 50 30 May-17

52 Nanded WANGI 216 0 216 56 60 100 Mar-17

53 Nanded NANDUSA 349 48 224 55 60 50 50 9 May-17

54 Nanded EKDARA 368 0 232 100 50 50 32 Apr-17

55 Nanded SUGAON (KH) 379 0 241 35 30 40 40 40 20 20 16 Aug-17

56 Nanded NILA 468 0 262 25 45 40 45 50 35 22 Jul-17

57 Nanded WADGAON 326 0 262 30 30 30 40 60 35 20 17 Aug-17

58 Nanded KASARKHEDA 607 0 302 20 25 25 25 50 40 30 30 20 37 Oct-17

59 Nanded GOPAL CHAWADI 751 0 303 35 40 50 50 60 28 20 20 Aug-17

60 Nanded TALNI 538 0 307 20 30 30 30 40 30 20 25 25 40 17 Nov-17

61 Nanded RAHATI (BK) 571 0 354 25 30 35 40 50 30 20 20 50 54 Oct-17

62 Nanded HASSAPUR 441 0 363 20 40 50 50 50 30 20 35 35 33 Oct-17

63 Nanded WAJEGAON 968 1 368 40 50 50 50 50 30 20 20 30 28 Oct-17

64 Nanded WAGHI 605 1 379 25 45 65 70 60 25 20 30 25 14 Oct-17

65 Nanded TUPPA 667 0 394 50 60 50 70 60 30 20 25 29 Sep-17

Nanded District Swachhata Plan 102

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

66 Nanded LIMBGAON 712 0 406 35 45 55 60 70 50 25 30 36 Sep-17

67 Nanded BABULGAON 513 0 409 40 50 50 55 65 50 40 30 29 Sep-17

68 Nanded MARLAK (BK) 675 0 427 45 55 70 75 75 30 30 30 17 Sep-17

69 Nanded VISHNUPURI 1069 0 442 100 50 60 70 70 25 25 20 22 Sep-17

70 Nanded KAKANDI 611 0 482 50 80 90 50 60 30 25 30 40 27 Oct-17

71 Nanded DHANEGAON 1327 7 630 60 70 90 100 90 40 40 30 50 40 20 Nov-17

72 Nanded BALIRAMPUR 1186 0 691 100 90 100 100 80 50 40 30 50 51 Oct-17

73 Nanded WADI (BK) 1785 0 1529 100 150 200 200 150 100 50 50 150 150 100 129 Dec-17

1 Umri JIRONA 108 0 0 ODF

2 Umri RAMKHADAK 153 0 3 ODF 3

3 Umri MANUR 394 0 6 ODF 6

4 Umri KAUDGAON 144 3 28 6 8 7 7 Apr-17

5 Umri GANIPUR 89 0 29 9 10 10 Mar-17

6 Umri ABDULAPUR 300 0 46 10 18 18 Mar-17

7 Umri SAWARGAON (D) 148 3 46 10 18 18 Mar-17

8 Umri PALASGAON 116 16 64 10 27 10 17 Apr-17

9 Umri HASSA 157 9 67 7 20 20 20 Apr-17

10 Umri KARKALA 98 0 68 11 7 20 30 Apr-17

11 Umri KAWALGUDA (BK) 161 0 69

9 10 10 10 30 May-17

12 Umri MAHATI 144 3 71 10 10 10 21 20 May-17

13 Umri WAGHALWADA 242 1 72 14 14 14 15 15 May-17

Nanded District Swachhata Plan 103

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

14 Umri NAGTHANA (BK) 176 0 78 8 15 15 20 20 May-17

15 Umri SHIVANGAON 178 1 78 18 15 10 18 17 May-17

16 Umri RAHATI (KH) 231 23 82 12 15 15 20 20 May-17

17 Umri ISHWARNAGAR 211 16 84 10 18 18 14 24 May-17

18 Umri KAWALGUDA (KH) 181 0 87

10 10 10 29 28 May-17

19 Umri BHAYEGAON 239 5 89 20 17 17 17 18 May-17

20 Umri SINGNAPUR 174 0 98 8 22 22 23 23 May-17

21 Umri HIRADGAON 171 8 101 20 20 20 20 21 May-17

22 Umri NAGTHANA (KH) 181 0 103 20 20 20 23 20 May-17

23 Umri BIJEGAON 248 1 109 9 20 20 30 30 May-17

24 Umri SHELGAON 314 4 113 35 19 19 19 21 May-17

25 Umri HATNI 185 1 126 10 10 10 25 25 5 20 21 Aug-17

26 Umri NIMTEK 221 1 135 15 12 12 20 25 17 17 17 Aug-17

27 Umri TURATI 163 9 143 10 10 10 25 25 13 25 25 Aug-17

28 Umri JAMGAON 292 1 154 25 20 20 25 25 10 14 15 Aug-17

29 Umri ASWALDARI 176 1 158 10 15 15 25 25 25 20 23 Aug-17

30 Umri SAWARGAON (KALA) 260 0 166

15 15 25 30 30 10 20 21 Aug-17

31 Umri MOKHANDI (J) 305 3 170 20 20 20 25 25 20 20 20 Aug-17

32 Umri BOLSA (BK) 296 0 176 37 20 20 25 25 10 19 20 Aug-17

33 Umri HUNDA (PU) 256 1 187 12 10 20 25 25 10 40 45 Aug-17

Nanded District Swachhata Plan 104

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

34 Umri ILEGAON (GP) 281 8 189 19 10 15 30 30 15 35 35 Aug-17

35 Umri KALGAON 342 30 196 16 15 15 35 35 20 30 30 Aug-17

36 Umri BORJUNI 291 7 209 16 15 15 35 38 15 37 38 Aug-17

37 Umri MANDALA 335 4 216 20 18 17 37 38 15 35 36 Aug-17

38 Umri SINDHI 751 1 216 50 25 20 39 40 12 15 15 Aug-17

39 Umri VASANTNAGAR 276 0 220 15 25 25 35 45 10 30 35 Aug-17

40 Umri BELDARA 355 1 227 31 25 25 42 48 16 20 20 Aug-17

41 Umri BALEGAON 341 0 230 25 30 25 48 48 10 22 22 Aug-17

42 Umri SHIRUR 290 0 230 20 30 25 45 45 10 30 25 Aug-17

43 Umri BOTHI 304 11 235 25 30 35 40 50 11 22 22 Aug-17

44 Umri KARLA 306 0 238 18 32 38 45 40 15 25 25 Aug-17

45 Umri WAGHALA 344 0 257 20 35 39 45 45 13 30 30 Aug-17

46 Umri BOLSA (GP) 338 3 272 20 20 35 42 48 17 45 45 Aug-17

47 Umri HUNDA (PG) 442 10 276 20 25 35 45 45 16 45 45 Aug-17

48 Umri SOMTHANA (A) 409 1 290 25 25 37 38 48 17 50 50 Aug-17

49 Umri HANGARGA 330 0 303 23 32 38 45 51 14 50 50 Aug-17

50 Umri KUDLA 425 1 313 18 35 35 48 52 25 50 50 Aug-17

51 Umri DHOLUMRI 401 0 317 27 32 38 41 57 22 50 50 Aug-17

52 Umri CHINCHALA (PU) 371 0 318 23 31 35 48 52 39 40 50 Aug-17

53 Umri DHANORA (BK) 470 0 337 37 40 40 45 55 35 40 45 Aug-17

54 Umri BITNAL 454 1 366 48 45 50 55 55 13 50 50 Aug-17

55 Umri GORTHA 485 0 374 60 42 52 55 60 15 45 45 Aug-17

Nanded District Swachhata Plan 105

Sr. No.

Block GP Name

Total Detail

Entered (With & Without Toilet) -

BLS 2012

Total No.

Additional HHs

(after BLS

2012)

Total No.

Defunct HHs

Total No.

IHHLs target

- as per BLS

2012

Online

Status

Jan

-17

Feb

-17

Mar

-17

Ap

r-17

May

-17

Jun

-17

Jul-

17

Au

g-17

Sep

-17

Oct

-17

No

v-17

De

c-17

Month ODF

56 Umri IJJATGAON 542 0 404 14 45 55 65 68 40 55 62 Aug-17

57 Umri GOLEGAON 564 3 492 22 55 65 70 75 80 60 65 Aug-17

58 Umri TALEGAON 916 0 586 86 95 105 220 80 May-17

Nanded District Swachhata Plan 106

PriMove Pune UNICEF Mumbai

Annexure 3: Officials who participated in preparation of the plan

Sr. No.

Location Name of Participant Designation Mobile No.

1 ZP Nanded Hon. Ashok Shingare CEO

2 ZP Nanded Hon. Padmakar Kendre Add. CEO

3 ZP Nanded G. L. Ramod Dy. CEO WATSAN

4 Unicef Mumbai Jayant Deshpande State Consultant

5 WSSO Mumbai Arun Rasal Regional Coordinator

6 ZP Nanded Dr. Pravinkumar Ghule Asst. Project officer 9960160614

7 ZP Nanded G. R. Chatane Account officer Class - 2 9423856944

8 ZP Nanded Alkesh B. Shirshetvar Superintendent 7350550004

9 ZP Nanded Shrimati Kishve N. V. Asst. Account Officer 9890115311

10 DWSM Nanded Milind Gy. Vyavahare IEC (DPM) 9422188094

11 DWSM Nanded Vishal V. Kadam Sanitation Expert 9921393030

12 DWSM Nanded Chaitanya L. Tandulavadikar CB Expert 9028000018

13 DWSM Nanded Mahendra K. Vatore Sociologist 7057436568

14 DWSM Nanded Pravin R. Patil M & E (SBM) 9433736261

15 DWSM Nanded Suryakant Hingmire Data Operator 8308888304

16 DWSM Nanded Vitthal H. Changale Accountant SBM 9527789940

17 DWSM Nanded Krushna N. Gopivar M & E (NRDWP) 8390097174

18 DWSM Nanded Sushil V. Manavatkar HRD 8271243933

19 DWSM Nanded Nikisha S. Ingole F & P Consultants 8482915198

20 DWSM Nanded Kapendra P. Desai WQ Consultants 9158885656

21 DWSM Nanded Gokhale S. P. WQ Inspector 8412886558

22 DWSM Nanded Nandlal K. Lokade IEC (NRDWP) 9403004162

23 DWSM Nanded Nagesh C. Kandhare Social Development Expert (Jal-2) 9579158840

24 DWSM Nanded Smita V. Hambarde Engineer (Jal-2) 8379954933

25 Ardhapur K. H. Gaikwad EOP 7709276200

26 Ardhapur Shekh Rasik Babamiya Cluster Coordinator 9665801578

27 Bhokar J. D. Gore BDO 9921139963

28 Bhokar V. B. Kamble EOP 9604832587

29 Bhokar Pandit Santosh Dilip Cluster Coordinator 8652388484

30 Biloli P. M. Garje EOP 9423438290

31 Biloli Suryavanshi Hanumant Maroti Cluster Coordinator 7387113172

32 Deglur D. V. Suryavanshi EOP 9422873251

33 Deglur Bhopalkar Sunil Ramesh Cluster Coordinator 9860402389

34 Deglur B. M. Kathewad EOP 9552294603

35 Dharmabad Sanjay Mirajkar EOP 9423137625

36 Dharmabad Marbade Ganesh Baburav Cluster Coordinator 7385876780

37 Hadgaon B. K. Chavan EOP 8275219445

38 Hadgaon Chavan Gunvant Ramrav Cluster Coordinator 9921918573

39 Himayatnagar Raviraj Kshirsagar EOP 7875677711

Nanded District Swachhata Plan 107

PriMove Pune UNICEF Mumbai

Sr. No.

Location Name of Participant Designation Mobile No.

40 Himayatnagar Patange Satavajirav Gajanan Cluster Coordinator 9604159975

41 Kandhar P. K. Sontakke EOP 9423139808

42 Kandhar Shinde Balasaheb Vyankatrao Cluster Coordinator 9823766816

43 Kinvat S. V. Yevate EOP 9422650695

44 Kinvat Turewale Sanjay Karan Cluster Coordinator 9767040036

45 Loha D. I. Gaikwad EOP 9970889724

46 Loha Kadam Premchand Ganpatrav Cluster Coordinator 9850327832

47 Mahur Sharad Teltumade EOP 9921411914

48 Mahur Govande Budhratna Ashokrav Cluster Coordinator 9545246358

49 Mudkhed P. D. Murade EOP 9881292179

50 Mudkhed Waghmare Arun Marotrav Cluster Coordinator 9890941441

51 Mukhed P. S. Jadhav EOP 9588424348

52 Mukhed Swami Nagesh Sarang Cluster Coordinator 7057937900

53 Naigaon Katkar B. Y. EOP 9860168352

54 Naigaon Indurkar Dattatray Pandharinath Cluster Coordinator 9822173024

55 Nanded Dilip S. Bacchevar EOP 9421869807

56 Nanded Tarate Ram Gangaram Cluster Coordinator 8600852183

57 Umari D. V. Jogpethe EOP 9422649519

58 Umari K. S. Thormothe Cluster Coordinator 8983059382

Nanded District Swachhata Plan 108

PriMove Pune UNICEF Mumbai

Total GPs in the high burden block

GPs with target below 50 IHHLs

To be made ODF solely by the Gramsevak without any

external support.

GPs with target between 50-100

IHHLs

To be made ODF by the Gramsevak with support from

the EOP.

High burden GPs with target above

100 IHHLs

To be focused on mission mode by

4/5 teams

Annexure 4: Strategy proposed for low burden blocks

It has been an experience that the low burden blocks can be made ODF in short duration

through focused and intense strategy. The district has proposed a strategy specifically for

Ardhapur, Hadgaon and Bhokar blocks. The strategy includes three key aspects –

mobilization of human resources, logistic support by the district and focused efforts in high

burden GPs on campaign mode. Following are the key components of the proposed

strategy-

The GPs in the block will be divided in three group- GPs with target below 50 IHHLs, GPs

with target between 50-100 IHHLs and high burden GPs with target above 100 IHHLs. While

targeting high burden GPs with this approach, wards/ habitations will be the lowest unit for

implementation of this approach. This segregation will be finalized during the ODEP process

itself.

The GPs with target below 50 IHHLs will be made ODF solely by the Gramsevak without

any external

support.

The GPs with

target between

50-100 IHHLs

will be made

ODF by the

Gramsevak with

support from

the EOP.

The high burden

GPs with target

above 100

IHHLs will be

focused in a mission mode as follows-

A team of around 20-25 persons including BRCs, ODEP MTs and motivators, active

government functionaries and community members willing to work full time on

sanitation will be formed. This team will visit high burden GPs for focused efforts. The

team will be further divided in 4/5 sub teams and the high burden GPs will be

distributed among the teams. These team members will reside at a central place near

the target GPs and will spend whole day in the target GPs.

Every team member will visit one GP at a time, regularly for 10-15 days at a stretch and

will take focused efforts for reducing the burden in these GPs. Daily activities like

implementation of rapid ODEP process, IEC and triggering, arrangements for supply

chain, etc. will be finalized and conducted in the GPs along with the GP level

Nanded District Swachhata Plan 109

PriMove Pune UNICEF Mumbai

functionaries and villagers. In this way, the target of low burden blocks will be reduced

to a considerable level.

The gramsevaks and othe village functionaries will be instructed to remain present and

participate in the GP level processes. The district officials will ensure logistic

arrangements like lodging, boarding and transport facilities for the team members. The

district will also transfer funds required for IHHL construction in time.

A daily monitoring mechanism will be developed which will include physical, financial as

well as process monitoring. Weekly review will also be conducted to keep track of the

progress. Following schematic presents the strategy-

Presence and

involvement

of village

functionaries

Logistic

arrangements

by the district

Daily

Monitoring

Weekly

review

Fund transfer

Nanded District Swachhata Plan 110

PriMove Pune UNICEF Mumbai