Laporan Keuangan Contoh

40
LAPORAN KEUANGAN PROYEK : LAPORAN PERPIPAAN TEMANGGUNG Tgl. 21 Maret s/d tgl. 12 April 2013 Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u Material Alat-alat Tenaga TERIMA DARI KANTOR 5,372,000.00 JAMINAN PENAWARAN 21/3/2013 JAMINAN PELAKSANAAN JAMINAN UANG MUKA BENER 6/04/2013 DENDY SEMARANG 9/04/2013 DENDY SEMARANG 12/04/2013 HERY SEMARANG Jumlah Minggu ini 5,372,000.00 0.00 0.00 0.00 Jumlah Minggu lalu 0.00 0.00 0.00 0.00 Jumlah Minggu ini dan Minggu lalu 5,372,000.00 0.00 0.00 0.00 Mengetahui : Diperiksa oleh : SOEHARNO DENDY Direktur GS LAPORAN KEUANGAN PROYEK : LAPORAN PERPIPAAN TEMANGGUNG Tgl. 13 April s/d tgl. 19 April 2013 Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u Material Alat-alat Tenaga TERIMA DARI KANTOR 5,372,000.00

Transcript of Laporan Keuangan Contoh

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNGTgl. 21 Maret s/d tgl. 12 April 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 5,372,000.00

JAMINAN PENAWARAN21/3/2013 JAMINAN PELAKSANAAN

JAMINAN UANG MUKABENER

6/04/2013 DENDY SEMARANG9/04/2013 DENDY SEMARANG12/04/2013 HERY SEMARANG

Jumlah Minggu ini 5,372,000.00 0.00 0.00 0.00Jumlah Minggu lalu 0.00 0.00 0.00 0.00Jumlah Minggu ini dan Minggu lalu 5,372,000.00 0.00 0.00 0.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNGTgl. 13 April s/d tgl. 19 April 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 5,372,000.00

Jumlah Minggu ini 5,372,000.00 0.00 0.00 0.00Jumlah Minggu lalu 0.00 0.00 0.00 0.00Jumlah Minggu ini dan Minggu lalu 5,372,000.00 0.00 0.00 0.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG

Tgl. 27 April s/d tgl. 3 Mei 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 7,689,250.00TERIMA DARI KANTOR 7,500,000.00TERIMA DARI KANTOR 25,000,000.00Jumali 2,400,000.00Tenaga Kantor 1,595,000.00Tenaga Lapangan 2,230,000.00Nota SuciNota Dendy 16,750.00Nota Ndari 285,000.00Nota Kusdi 111,000.00Nota Amin 20,000.00Nota Hery 96,500.00Alat Dendy 253,500.00Matrial Ndari 768,500.00Alat Anjar 231,500.00Bata Merah Nafi 4,500,000.00Bon Muhdi 2,000,000.00Uang Muka Pak Hery II 25,000,000.00

Jumlah Minggu ini 40,189,250.00 32,668,500.00 1,014,250.00 5,825,000.00Jumlah Minggu lalu ### ### 1,545,800.00 700,000.00Jumlah Minggu ini dan Minggu lalu ### ### 2,560,050.00 6,525,000.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG

Tgl. 4 Mei s/d tgl. 10 Mei 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 12,911,850.00Terima dari kantor sisi Mud 658,000.00Terima dari kantor (dendy) 300,000.00TERIMA DARI KANTOR 200,000.00Tenaga Kantor 1,811,250.00Tenaga Lapangan 2,517,500.00Tenaga Borong PIPA 6,000,000.00Nota SuciNota Ndari 650,900.00Nota Kusdi 311,500.00Nota Hery 81,500.00Nota Amin 15,000.00alat alat Dendy 1,005,730.00alat Ndari 228,000.00Matrial Ndari 158,000.00Alat Anjar 400,000.00Traspot Pak Jumali Langsir Batu 200,000.00

Jumlah Minggu ini 14,069,850.00 158,000.00 2,892,630.00 10,328,750.00Jumlah Minggu lalu ### ### 2,560,050.00 6,525,000.00Jumlah Minggu ini dan Minggu lalu ### ### 5,452,680.00 16,853,750.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG

Tgl. 4 Mei s/d tgl. 10 Mei 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 25,315,050.00Terima dari kantor (dendy) 230,000.00Jumali 600,000.00Tenaga Kantor 1,816,250.00Tenaga Lapangan 2,640,000.00Tenaga Borong PIPA 12,500,000.00Nota SuciNota Ndari 513,000.00Nota Kusdi 225,700.00Nota Hery 42,000.00Nota rohmat 140,000.00Pelicin Pipa 4 Kaleng 160,000.00Titipan Pak DadesTraspot semarang dendyTraspot semarang dendyAlat ndari 500,000.00alat anjar 300,000.00alat dendy 240,495.00

Jumlah Minggu ini 25,545,050.00 600,000.00 2,121,195.00 16,956,250.00Jumlah Minggu lalu ### ### 5,452,680.00 16,853,750.00Jumlah Minggu ini dan Minggu lalu ### ### 7,573,875.00 33,810,000.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG

Tgl. 11 Mei s/d tgl. 23 Mei 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 22,564,217.00Terima dari kantor (dendy) 200,000.00Terima dari kantor (hery) 53,400.00Semen (Ndari) 977,000.00Bata Merah (buat saluran) 300,000.00Tenaga Kantor 2,386,250.00Tenaga Lapangan 2,855,000.00Tenaga Borong PIPA 13,000,000.00Tenaga Ceosing pipa 3" 895,000.00Nota Suci 465,600.00Nota Ndari 329,867.00Nota Kusdi 154,500.00Nota Hery 69,000.00Nota Gono 12,000.00Nota Anjar 120,000.00alat alat dendy 397,800.00matrial ndari 242,000.00alat alat ndari 62,500.00lain lain ndarialat hery 53,400.00Alat alat anjar 200,000.00

Jumlah Minggu ini 22,817,617.00 1,519,000.00 1,864,667.00 19,136,250.00Jumlah Minggu lalu ### ### 7,573,875.00 33,810,000.00Jumlah Minggu ini dan Minggu lalu ### ### 9,438,542.00 52,946,250.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG

Tgl. 24 Mei s/d tgl. 31 Mei 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

24-05-13 TERIMA DARI KANTOR 22,482,850.0031-05-13 Terima dari kantor (dendy) 420,000.0028-05-13 Terima dari kantor (dendy) 2,800,000.00

Batu Pecah 2/3 500,000.00Kayu Usuk Budi utomo 230,000.00DP asesoris pipa 5,000,000.00Tenaga Kantor 1,891,250.00Tenaga Lapangan 2,392,500.00Tenaga Borong PIPA 10,000,000.00Sewa Stamper 2 hari 400,000.00Nota Suci 408,300.00Nota Ndari 100,500.00Nota Kusdi 171,500.00Nota Hery 86,000.00Nota dendy 439,800.00NOTA DUWIK 65,000.00Nota amin 13,000.00Nota Anjar 85,000.00Service stamper 420,000.00Paving 2,800,000.00Alat Dendy 204,900.00Lain-lain NdariAlat Anjar 273,000.00

Jumlah Minggu ini 25,702,850.00 8,530,000.00 2,267,000.00 14,683,750.00Jumlah Minggu lalu ### ### 9,438,542.00 52,946,250.00Jumlah Minggu ini dan Minggu lalu ### ### ### 67,630,000.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG

Tgl. 24 Mei s/d tgl. 31 Mei 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

TERIMA DARI KANTOR 22,011,852.00Terima dari kantor (dendy) 650,000.00AVE 2,849,000.00Pasir jumali 600,000.00Batu Jumali 600,000.00Bambu 12 buah 60,000.00Tenaga Kantor 1,941,250.00Tenaga Lapangan 2,987,500.00Tenaga Borong PIPA 11,000,000.00Nota Ndari 391,102.00Nota Kusdi 254,500.00Nota Hery 91,500.00Nota gono 37,000.00NOTA DUWIK 100,000.00Nota Anjar 100,000.00Alat-alat dendy 347,440.00Alat-alat ndari 538,000.00Lain-lain ndariAlat-alat anjar 250,000.00Lain-lain anjarLain-lain HeryAlat-alat pak di 100,000.00

Jumlah Minggu ini 22,661,852.00 4,109,000.00 2,209,542.00 15,928,750.00Jumlah Minggu lalu ### ### ### 67,630,000.00Jumlah Minggu ini dan Minggu lalu ### ### ### 83,558,750.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNGTgl. 24 Juni s/d tgl. 28 Juni 2013

Tgl. No. Bon U r a I a n Uang masuk U a n g ke l u a rMaterial Alat-alat Tenaga

Terima dari kantor (dendy) 26,295,125.00Keni 3" (4 buah) slamet 120,000.00Pelicin pipa (7buah) muhdi 280,000.00Tenaga Kantor 1,846,250.00Tenaga Borong pipa 11,000,000.00Nota SuciNota Ndari 204,000.00Nota Hery 74,475.00Nota Anjar 149,000.00Nota DendyAngsuran Hery bengkel 10,000,000.00Nota ndari 400,000.00

Jumlah Minggu ini 26,295,125.00 10,400,000.00 678,475.00 12,995,250.00Jumlah Minggu lalu ### ### ### 110,550,000.00Jumlah Minggu ini dan Minggu lalu ### ### ### 123,545,250.00

Mengetahui : Diperiksa oleh :

SOEHARNO DENDYDirektur GS

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 1Tgl. 21 Maret s/d tgl. 12 April 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

5,372,000.00

150,000.00 150,000.00 5,222,000.00632,000.00 632,000.00 4,590,000.00

3,290,000.00 3,290,000.00 1,300,000.00200,000.00 200,000.00 1,100,000.00400,000.00 400,000.00 700,000.00400,000.00 400,000.00 300,000.00300,000.00 300,000.00 0.00

5,372,000.00 5,372,000.000.00 0.00

5,372,000.00 5,372,000.00Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 1Tgl. 13 April s/d tgl. 19 April 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

5,372,000.00

0.00 5,372,000.000.00 5,372,000.000.00 5,372,000.000.00 5,372,000.000.00 5,372,000.00

0.00 5,372,000.000.00 5,372,000.00

0.00 0.000.00 0.000.00 0.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 2Tgl. 27 April s/d tgl. 3 Mei 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

7,689,250.0015,189,250.0040,189,250.00

2,400,000.00 37,789,250.001,595,000.00 36,194,250.002,230,000.00 33,964,250.00

635,000.00 635,000.00 33,329,250.0016,750.00 33,312,500.00

285,000.00 33,027,500.00111,000.00 32,916,500.0020,000.00 32,896,500.0096,500.00 32,800,000.00

253,500.00 32,546,500.00768,500.00 31,778,000.00231,500.00 31,546,500.00

4,500,000.00 27,046,500.002,000,000.00 25,046,500.00

25,000,000.00 46,500.00

635,000.00 40,142,750.00 46,500.005,462,000.00 ### 0.006,097,000.00 ### 46,500.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 3Tgl. 4 Mei s/d tgl. 10 Mei 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

12,911,850.0013,569,850.0013,869,850.0014,069,850.00

1,811,250.00 12,258,600.002,517,500.00 9,741,100.006,000,000.00 3,741,100.00

524,200.00 524,200.00 3,216,900.00650,900.00 2,566,000.00311,500.00 2,254,500.0081,500.00 2,173,000.0015,000.00 2,158,000.00

1,005,730.00 1,152,270.00172,000.00 400,000.00 752,270.00

158,000.00 594,270.00400,000.00 194,270.00200,000.00 -5,730.00

696,200.00 14,075,580.00 194,270.006,097,000.00 ### 46,500.006,793,200.00 ### 40,770.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 4Tgl. 4 Mei s/d tgl. 10 Mei 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

25,355,820.0025,585,820.00

600,000.00 24,985,820.001,816,250.00 23,169,570.002,640,000.00 20,529,570.00

12,500,000.00 8,029,570.00428,100.00 428,100.00 7,601,470.00

513,000.00 7,088,470.00225,700.00 6,862,770.0042,000.00 6,820,770.00

140,000.00 6,680,770.00160,000.00 6,520,770.00

5,000,000.00 5,000,000.00 1,520,770.00250,000.00 250,000.00 1,270,770.00200,000.00 200,000.00 1,070,770.00

500,000.00 570,770.00300,000.00 270,770.00240,495.00 30,275.00

5,878,100.00 25,555,545.00 10,495.006,793,200.00 ### 40,770.00

12,671,300.00 ### 30,275.00Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 5Tgl. 11 Mei s/d tgl. 23 Mei 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

22,594,492.0022,794,492.0022,847,892.00

977,000.00 21,870,892.00300,000.00 21,570,892.00

2,386,250.00 19,184,642.002,855,000.00 16,329,642.00

13,000,000.00 3,329,642.00895,000.00 2,434,642.00465,600.00 1,969,042.00329,867.00 1,639,175.00154,500.00 1,484,675.0069,000.00 1,415,675.0012,000.00 1,403,675.00

120,000.00 1,283,675.00397,800.00 885,875.00242,000.00 643,875.0062,500.00 581,375.00

295,500.00 295,500.00 285,875.0053,400.00 232,475.00

200,000.00 32,475.00

295,500.00 22,815,417.00 -2,200.0012,671,300.00 ### 30,275.0012,966,800.00 ### 32,475.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 6Tgl. 24 Mei s/d tgl. 31 Mei 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

22,515,325.0022,935,325.0025,735,325.00

500,000.00 25,235,325.00230,000.00 25,005,325.00

5,000,000.00 20,005,325.001,891,250.00 18,114,075.002,392,500.00 15,721,575.00

10,000,000.00 5,721,575.00400,000.00 5,321,575.00408,300.00 4,913,275.00100,500.00 4,812,775.00171,500.00 4,641,275.0086,000.00 4,555,275.00

439,800.00 4,115,475.0065,000.00 4,050,475.0013,000.00 4,037,475.0085,000.00 3,952,475.00

420,000.00 3,532,475.002,800,000.00 732,475.00

204,900.00 527,575.00227,000.00 227,000.00 300,575.00

273,000.00 27,575.00

227,000.00 25,707,750.00 4,900.0012,966,800.00 ### 32,475.0013,193,800.00 ### 27,575.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 6Tgl. 24 Mei s/d tgl. 31 Mei 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

22,039,427.0022,689,427.00

2,849,000.00 19,840,427.00600,000.00 19,240,427.00600,000.00 18,640,427.0060,000.00 18,580,427.00

1,941,250.00 16,639,177.002,987,500.00 13,651,677.00

11,000,000.00 2,651,677.00391,102.00 2,260,575.00254,500.00 2,006,075.0091,500.00 1,914,575.0037,000.00 1,877,575.00

100,000.00 1,777,575.00100,000.00 1,677,575.00347,440.00 1,330,135.00538,000.00 792,135.00

212,000.00 212,000.00 580,135.00250,000.00 330,135.00

90,000.00 90,000.00 240,135.00116,000.00 116,000.00 124,135.00

100,000.00 24,135.00

418,000.00 22,665,292.00 3,440.0013,193,800.00 ### 27,575.0013,611,800.00 ### 24,135.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

LAPORAN KEUANGANPROYEK : LAPORAN PERPIPAAN TEMANGGUNG No. 100Tgl. 24 Juni s/d tgl. 28 Juni 2013

U a n g ke l u a r S a l d oLain-lain Jumlah

26,295,125.00120,000.00 26,175,125.00280,000.00 25,895,125.00

1,846,250.00 24,048,875.0011,000,000.00 13,048,875.00

521,400.00 521,400.00 12,527,475.00204,000.00 12,323,475.0074,475.00 12,249,000.00

149,000.00 12,100,000.001,700,000.00 1,700,000.00 10,400,000.00

10,000,000.00 400,000.00400,000.00 0.00

2,221,400.00 26,295,125.00 38,931.0018,000,150.00 ### 24,135.0020,221,550.00 ### -14,796.00

Pelaksana Lapangan

HERY + SUNDARIADM + Logistik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 27 April s/d 4 Mei 2013MIMGGU KE : 3PRESTASI : 6,16 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 AVE 2,849,000 2,849,0003 Hery Bengkel 59,000,000 59,000,000

JUMLAH 295,586,078 59,000,000 354,586,078II. TENAGA KERJA :

1 Tenaga Kantor 1,811,250 1,811,2502 Tenaga Lapangan 2,517,500 2,517,5004 Tenaga Borong PIPA 6,658,000 6,658,000

JUMLAH 0 10,986,750 10,986,750III. LAIN-LAIN :

1 Persediaan 1,000,000 1,000,0002 Nota Suci 524,200 524,2003 Nota Ndari 650,900 650,9004 Nota Kusdi 311,500 311,5005 Nota Hery 81,500 81,5006 Nota Amin 15,000 15,000

JUMLAH 0 2,583,100 2,583,100JUMLAH TOTAL 295,586,078 72,569,850 368,155,928

Magelang , 3 Mei 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 5 Mei s/d 10 Mei 2013MIMGGU KE : 4PRESTASI : 20,16 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 AVE 2,849,000 2,849,0003 Hery Bengkel 59,000,000 59,000,0004 Jumali 600,000 600,000

JUMLAH 354,586,078 600,000 355,186,078II. TENAGA KERJA :

1 Tenaga Kantor 1,816,250 1,816,2502 Tenaga Lapangan 2,640,000 2,640,0003 Tenaga Borong PIPA 14,266,000 14,266,000

JUMLAH 0 18,722,250 18,722,250III. LAIN-LAIN :

1 Persediaan 1,000,000 1,000,0002 Nota Suci 428,100 428,1003 Nota Ndari 513,000 513,0004 Nota Kusdi 225,700 225,7005 Nota Hery 42,000 42,0006 Nota rohmat 140,000 140,0007 Pelicin Pipa 4 Kaleng 160,000 160,0008 Titipan Pak Dades 5,000,000 5,000,0009 Traspot semarang dendy 250,000 250,000

JUMLAH 0 7,758,800 7,758,800JUMLAH TOTAL 354,586,078 27,081,050 381,667,128

Magelang , 3 Mei 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 5 Mei s/d 10 Mei 2013MIMGGU KE : 5PRESTASI : 50,011 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 AVE 2,849,000 2,849,0003 Hery Bengkel 64,000,000 64,000,0004 Semen (Ndari) 977,000 977,0005 Bata Merah (buat saluran) 300,000 300,000

JUMLAH 359,586,078 1,277,000 360,863,078II. TENAGA KERJA :

1 Tenaga Kantor 2,386,250 2,386,2502 Tenaga Lapangan 2,855,000 2,855,0003 Tenaga Borong PIPA 1,766,000 13,239,000 15,005,0004 Tenaga Ceosing pipa 3" 895,000 895,000

JUMLAH 1,766,000 19,375,250 21,141,250III. LAIN-LAIN :

1 Persediaan 1,000,000 1,000,0002 Nota Suci 465,600 465,6003 Nota Ndari 329,867 329,8674 Nota Kusdi 154,500 154,5005 Nota Hery 69,000 69,0006 Nota Gono 12,000 12,0007 Nota Anjar 120,000 120,000

JUMLAH 0 2,150,967 2,150,967JUMLAH TOTAL 361,352,078 22,803,217 384,155,295

Magelang , 17 Mei 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 11 Mei s/d 24 Mei 2013MIMGGU KE : 6PRESTASI : 61,12 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 AVE 2,849,000 2,849,0003 Hery Bengkel 64,000,000 64,000,0004 Pasir jumali 600,000 600,0005 AVE (besi + semen) 5,292,500 5,292,5006 Batu Pecah 2/3 500,000 500,000

7Kayu Usuk Budi utomo 230,000 230,0008DP asesoris pipa 5,000,000 5,000,000

JUMLAH 359,586,078 11,622,500 371,208,578II. TENAGA KERJA :

1 Tenaga Kantor 1,891,250 1,891,2502 Tenaga Lapangan 2,392,500 2,392,5003 Tenaga Borong PIPA 2,005,000 10,962,000 12,967,0004 Sewa Stamper 2 hari 400,000 400,000

JUMLAH 2,005,000 15,645,750 17,650,750III. LAIN-LAIN :

1 Persediaan 700,000 700,0002 Nota Suci 408,300 408,3003 Nota Ndari 100,500 100,5004 Nota Kusdi 171,500 171,5005 Nota Hery 86,000 86,0006 Nota dendy 439,800 439,8007 NOTA DUWIK 65,000 65,0008 Nota amin 13,000 13,0009 Nota Anjar 85,000 85,000

JUMLAH 0 2,069,100 2,069,100JUMLAH TOTAL 361,591,078 29,337,350 390,928,428

Magelang , 23 Mei 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 25 Mei s/d 31 Mei 2013MIMGGU KE : 7PRESTASI : 72,23 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 AVE 2,849,000 2,849,0003 AVE (besi + semen) 5,292,500 5,292,5004 Hery Bengkel 64,000,000 64,000,0005 Asesoris pipa 11,517,000 11,517,0006 Pasir jumali 600,000 600,0007 Batu Jumali 600,000 600,0008 Bambu 12 buah 60,000 60,000

JUMLAH 376,995,578 660,000 377,655,578II. TENAGA KERJA :

1 Tenaga Kantor 0 1,941,250 1,941,2502 Tenaga Lapangan 0 2,987,500 2,987,5003 Tenaga Borong PIPA 2,967,000 11,358,000 14,325,000

JUMLAH 2,967,000 16,286,750 19,253,750III. LAIN-LAIN :

1 Persediaan 1,000,000 1,000,0002 Nota Ndari 391,102 391,1023 Nota Kusdi 254,500 254,5004 Nota Hery 91,500 91,5005 Nota gono 37,000 37,0006 NOTA DUWIK 100,000 100,0007 Nota Anjar 100,000 100,000

JUMLAH 0 1,974,102 1,974,102JUMLAH TOTAL 379,962,578 18,920,852 398,883,430

Magelang , 31 Mei 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 1 Juni s/d 7 Juni 2013MIMGGU KE : 8PRESTASI : 75,256 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 AVE 5,292,500 5,292,5003 Hery Bengkel 64,000,000 64,000,0004 Asesoris pipa 11,517,000 11,517,0005 Pasir jumali 650,000 650,000

JUMLAH 373,546,578 650,000 374,196,578II. TENAGA KERJA :

1 Tenaga Kantor 0 1,610,000 1,610,0002 Tenaga Lapangan 0 2,717,500 2,717,5003 Tenaga Borong PIPA 3,325,000 6,498,000 9,823,000

JUMLAH 3,325,000 10,825,500 14,150,500III. LAIN-LAIN :

1 Persediaan 1,000,000 1,000,0002 Angsuran Motor 156,250 156,2503 Nota Kusdi 229,000 229,0004 Nota Suci 2 minggu 680,300 680,300

JUMLAH 0 2,065,550 2,065,550JUMLAH TOTAL 376,871,578 13,541,050 390,412,628

Magelang , 7 Juni 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

PROYEK : Pemasangan Pipa PVC Temanggung PERIODE : 24 Juni s/d 29 Juni 2013MIMGGU KE : 11PRESTASI : 89,56 %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1 PT WAVIN 292,737,078 292,737,0782 Ave 5,292,500 5,292,5003 Hery Bengkel 54,000,000 54,000,0004 Asesoris pipa 11,517,000 11,517,0005 Ave 1,288,500 1,288,5006 Ongkos bongkar cor dan pasangan 100,0007 Pembelian Keni dan Tee 193,450

JUMLAH 364,835,078 293,450 364,835,078II. TENAGA KERJA :

1 Tenaga Kantor 1,786,250 1,786,2502 Tenaga Borong PIPA 6,919,000 39,206,000 46,125,000

JUMLAH 6,919,000 40,992,250 47,911,250III. LAIN-LAIN :

1 Persediaan 500,000 500,0002 Nota suci 480,600 480,6003 Nota Ndari 429,700 429,7004 Nota Dendy 99,100 99,1005 Nota Anjar 70,000 70,000

JUMLAH 0 1,579,400 1,579,400JUMLAH TOTAL 371,754,078 42,865,100 414,325,728

Magelang , 28 Juni 2013

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO DendyDirektur Kabag. Teknik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

292,737,0782,849,00059,000,000

0 354,586,078

1,811,250 02,517,500 06,000,000 658,000

,

10,328,750 658,000

1,000,000 0524,200 0650,900 0311,500 081,500 015,000 0

2,583,100 012,911,850 355,244,078

Magelang , 3 Mei 2013

Yang Mengajukan :

SundariLogistik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

292,737,0782,849,00059,000,000

600,000 0

600,000 354,586,078

1,816,250 02,640,000 012,500,000 1,766,000

,

16,956,250 1,766,000

1,000,000428,100513,000225,70042,000140,000160,000

5,000,000250,000

7,758,800 025,315,050 356,352,078

Magelang , 3 Mei 2013

Yang Mengajukan :

SundariLogistik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

292,737,0782,849,00064,000,000

977,000 0300,000 0

1,277,000 359,586,078

2,386,250 02,855,000 013,000,000 2,005,000

895,000 0

19,136,250 2,005,000

1,000,000 0465,600 0329,867 0154,500 069,000 012,000 0120,000 0

2,150,967 022,564,217 361,591,078

Magelang , 17 Mei 2013

Yang Mengajukan :

SundariLogistik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

292,737,0782,849,00064,000,000

0 600,0005,292,500

500,000 0230,000 0

5,000,000 0

5,730,000 365,478,578

1,891,250 02,392,500 010,000,000 2,967,000

400,000 0

14,683,750 2,967,000

700,000 0408,300 0100,500 0171,500 086,000 0439,800 065,000 013,000 085,000 0

2,069,100 022,482,850 368,445,578

Magelang , 23 Mei 2013

Yang Mengajukan :

SundariLogistik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

292,737,0782,849,000 0

5,292,50064,000,00011,517,000

600,000 0600,000 060,000 0

4,109,000 373,546,578

1,941,250 02,987,500 011,000,000 3,325,000

15,928,750 3,325,000

1,000,000 0391,102 0254,500 091,500 037,000 0100,000 0100,000 0

1,974,102 022,011,852 376,871,578

Magelang , 31 Mei 2013

Yang Mengajukan :

SundariLogistik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

0 0

0 0

0 00 0

Magelang , 7 Juni 2013

Yang Mengajukan :

SundariLogistik

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

0 0

0 0

0 00 0

Magelang , 28 Juni 2013

Yang Mengajukan :

SundariLogistik

BON UANG SEMENTARAKas Bon No.

Kas harap bayar kepada : DENDY Jabatan : Pelaksana ProyekUang sebanyak : Rp. 0

( Empat juta empat ratus enam puluh empat ribu lima ratus rupiah )

Untuk membayar : 1. Material Kholidun Rp. 2. Tenaga : Kantor Rp. 3. Paingan Rp. 4. Balerejo Rp. 5. Nota-nota Rp. 6. Persediaan Rp. 7. Selamatan Rp. 8. Rp. 9. Rp. 10. Rp.

Jumlah Rp.

Akan dipertanggungjawabkan selambat-lambatnya tanggal 27 Maret 2009

Kota Mungkid, 20 Maret 2009

Setuju dibayar Yang menerima

SOEHARNO DENDYDirektur Pelaksana

BON UANG SEMENTARA

: Jembatan BATHANG

( Empat juta empat ratus enam puluh empat ribu lima ratus rupiah )

0

Kota Mungkid, 20 Maret 2009

Yang menerima

Pelaksana

PENGAJUAN KEUANGAN

PROYEK : Rehab Jembatan Aji No. 24.138.003.0PERIODE : 30 Maret s/d 4 April 2009MIMGGU KE : IIIPRESTASI : %

No. Tagihan No. Order Jumlah (Rp.)Minggu lalu Minggu ini s/d Minggu ini

I. MATERIAL :

1PC Gresik ( 17 April ) 4,950,000 4,950,0002Kholidun 1,253,650 1,253,6503Split 1/2 (Pakde Un) 398,000 398,0004Papan cor 765,000 765,0005Kholidun 1,390,200 1,390,2006Bambu 120,000 120,000

JUMLAH 7,366,650 1,510,200 8,876,850II. TENAGA KERJA :

1Kantor 0 02Paingan 0 03Balerejo 0 0

JUMLAH 0 0 0III. LAIN-LAIN :

1Nota : Rochmat (rokok) 415,000 415,000 Eko SW 125,000 125,000 Ndari 100,000 100,000 Rofik 30,000 30,000 Kusdi (rokok) 0

2Persediaan 300,000 300,000

JUMLAH 415,000 555,000 970,000JUMLAH TOTAL 7,781,650 2,065,200 9,846,850

Kota Mungkid, 3 April 2009

Setuju dibayar : Diperiksa oleh : Yang Mengajukan :

SOEHARNO Bambang M.Direktur Kabag. Teknik

pipa 2"pipa 3"pipa 4"pipa 4"

PENGAJUAN KEUANGAN

Dibayar (Rp.) Sisa (Rp.)

0 0

0 0

0 00 0

Kota Mungkid, 3 April 2009

Yang Mengajukan :

Eko SWPelaksana

1,500 7,250 10,875,000 7,926 9,000 71,334,000 2,298 9,000 20,682,000 1,206 23,000 27,734,000 ###

130,625,000

3,504 - 91,419,000 39,206,000 130,625,000

Semen (Ndari) 977,000Bata Merah (buat salura 300,000

Tenaga Borong PIPA 13,000,000Tenaga Ceosing pipa 3" 895,000

Nota Suci 465,600Nota Ndari 329,867Nota Kusdi 154,500Nota Hery 69,000Nota Gono 12,000Nota Anjar 120,000Persediaan 1,000,000