Kwitansi Pengeluaran 2013

131
Sep 1. Afrizal 750,000.00 1. Afrizal 750,000.00 2. Alif 750,000.00 2. Alif 750,000.00 3. Muti 750,000.00 3. Muti 750,000.00 4. Nova 750,000.00 4. Nova 750,000.00 5. M. Iqbal 750,000.00 5. M. Iqbal 750,000.00 6. Deni 500,000.00 6. Deni 500,000.00 7. Khairul 500,000.00 7. Khairul 200,000.00 8. Suraida 600,000.00 8. Suraida - 9. Fitri 600,000.00 9. Fitri 600,000.00 10. Haviz 600,000.00 10. Haviz 300,000.00 11. Bayu 400,000.00 11. Bayu - 12. Subhan 400,000.00 12. Subhan - Faisal 300,000.00 ### ### ### ### ### ###

Transcript of Kwitansi Pengeluaran 2013

Sep

1. Afrizal 750,000.00 1. Afrizal 750,000.00 2. Alif 750,000.00 2. Alif 750,000.00 3. Muti 750,000.00 3. Muti 750,000.00 4. Nova 750,000.00 4. Nova 750,000.00 5. M. Iqbal 750,000.00 5. M. Iqbal 750,000.00

6. Deni 500,000.00 6. Deni 500,000.00 7. Khairul 500,000.00 7. Khairul 200,000.00

8. Suraida 600,000.00 8. Suraida - 9. Fitri 600,000.00 9. Fitri 600,000.00 10. Haviz 600,000.00 10. Haviz 300,000.00

11. Bayu 400,000.00 11. Bayu - 12. Subhan 400,000.00 12. Subhan -

Faisal 300,000.00

### ###

############

DEBET KREDIT SISA

No. Uraian Jumlah Uang Tanggal Uraian Jumlah Uang Jumlah Sisa

1 PT. Kabong 2Aspal Hot Mix 87.17 Ton x 1,300,000.00 113,321,000.00 Panjar Ke 1 95,000,000.00 Prim Coat 352.80 Ltr x 7,000.00 2,469,600.00 2-Dec-13 Panjar Ke 2 30,000,000.00 Aspal Tikc 71.60 M1 x 1,450,000.00 103,820,000.00 2-Dec-13 Panjar Ke 3 30,000,000.00 Rambu 2.00 BH x 750,000.00 1,500,000.00 BPK 1,500,000.00 1,500,000.00

Sub. Total 222,610,600.00 155,000,000.00 67,610,600.00

Peneliti Kontrak alue Genting Kabong 1 Kabong 2 Kabong 3 Gogo 1 Gogo 3 Bts. Aceh Besar

Ardiansyah 750,000.00 750,000.00 750,000.00 750,000.00 750,000.00 750,000.00 750,000.00 ###Chalid 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 750,000.00 ###Firki 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 ###Muyasir 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 ###Chanti 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 ###Irwan (Balai) 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 ###Azhari 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 ###ADM 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 ###

Pengeluaran ### ### ### ### 3,250,000.00 ### ### ###Yg Sudah Serah ### ### 7,500,000.00 ### ### ###Sisa ###

PHO alue Genting Kabong 1 Kabong 2 Kabong 3 Gogo 1 Gogo 3 Bts. Aceh Besar Bencana Alam

Risman 750,000.00 750,000.00 750,000.00 ### 1,000,000.00 750,000.00 ### ### ###Chalid 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 750,000.00 500,000.00 ###Ir.Ahmad Faisal 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 750,000.00 500,000.00 ###Hendra Harianto 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 300,000.00 ###T. Zulhadi 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 300,000.00 ###Adriansyah 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 300,000.00 ###Firmansyah 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 300,000.00 ###Jufri 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 300,000.00 ###Chanti 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 300,000.00 ###ADM 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 ###

Pengeluaran ### ### ### ### 4,300,000.00 ### ### ### ###Yg Sudah Serah ### ### ### ### ### ### ###Sisa ###Total sisa ###

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 8,020,000.00

Uang Banyaknya : Delapan juta dua puluh ribu rupiah,-

Untuk Pembayaran : Pelunasan Damija

Aceh Besar, 28 Desember 2013Yang menerima :

Nama : Wahyu HidayatPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Pelunasan Damija

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 1,000,000.00

Uang Banyaknya : Satu juta rupiah,--

Untuk Pembayaran : Panjar 1 Damija

Aceh Besar, 16 Desember 2013Yang menerima :

Nama : AmiruddinPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Panjar 1 Damija

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 1,000,000.00

Uang Banyaknya : Satu juta rupiah,-

Untuk Pembayaran : Operasional Foto Damija dan Survey

Aceh Besar, 18 Desember 2013Yang menerima :

Nama : M. Alif AfriantoPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Operasional Foto Damija dan Survey

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Taufik (Pelaksana Jembatan Gogo 3)

Jumlah Uang : Rp. 42,416,000.00

Uang Banyaknya : Empat puluh dua juta empat ratus enam belas ribu rupiah,-

Untuk Pembayaran : Lunas Aspal sejumlah 40,32 Ton yang dilaksanakan oleh PT. Wirataco pada jembatan GOGO 3.

Aceh Besae, 3 Desember 2013Yang menerima :

Nama : Pekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Lunas Aspal sejumlah 40,32 Ton yang dilaksanakan oleh PT. Wirataco pada jembatan GOGO 3.

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 31.00 470,000.00 14,570,000.00 4-Sep-13 Panjar 1 Amiruddin 2,000,000.00 12,570,000.00 Damija 19+000 - 61+000

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

14,570,000.00 2,000,000.00

Tanda Tangan

Tanda Tangan

KREDIT DEBET SISA

No. Uraian Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa Tanda Tangan

1 Pinjaman 13,000,000.00 26-Aug-13 Storan 1 Abd Chalid 3,000,000.00 10,000,000.00

KREDIT DEBET SISA

No. Uraian Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa Tanda Tangan

13,000,000.00

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 5.00 470,000.00 2,350,000.00 26-Aug-13 Lunas M. Alif 2,350,000.00 -

Damija 125+000 - 130+000

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

2,350,000.00

Tanda Tangan

Tanda Tangan

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 14.00 470,000.00 6,580,000.00 Panjar 1 M. Alif 1,000,000.00 9,170,000.00

10.00 30,000.00 300,000.00 Panjar 2 M. Alif 1,000,000.00 8,170,000.00

3 agustus 2013 Lunas M. Alif 4,880,000.00 3,290,000.00

2 7.00 470,000.00 3,290,000.00 26-Aug-13 Panjar 1 M. Alif 1,000,000.00 2,290,000.00

10,170,000.00

Damija 69+000 - 83+000

Damija 83+000 - 90+000

Tanda Tangan

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 19 Maret 2013 CV. Cot Sebati 110,700,000.00 2 21 Maret 2013 CV. Semangat Baru 166,600,000.00 11-Mar-13 KE Lapangan Chalid 500,000.00 3 21 Maret 2013 CV. Muzulty 165,700,000.00 15-Mar-13 Panjar Ke 3 M. Syafiei 5,000,000.00 4 25 Maret 2013 CV. Talenta 170,170,000.00 15-Mar-13 Panjar Ke 1 Wahyu 1,500,000.00 5 3 April 2013 CV. Demi Rakyat 77,500,000.00 19-Mar-13 Op M.Iqbal 900,000.00 6 3 April 2013 CV. Perdana Jaya 173,900,000.00 20-Mar-13 Panjar Ke 4 M. Syafiei 10,000,000.00 7 3 April 2013 CV. Aceh Mandiri 112,900,000.00 20-Mar-13 Panjar Ke 3 Amir 2,500,000.00 8 3 April 2013 CV. Data Kudrat 161,900,000.00 21-Mar-13 Bayar Tiket Pesawat Sri Tanaka 6,500,000.00 9 4 Mei 2013 CV. Semangat Baru 78,900,000.00 21-Mar-13 Pengurusan Listrik Alindra 3,500,000.00

10 4 Mei 2013 CV. Talenta 78,000,000.00 21-Mar-13 Panjar Ke 2 Wahyu 2,500,000.00 11 4 Mei 2013 CV. Keisha Azura 90,700,000.00 21-Mar-13 Beli Printer Bayu 650,000.00

12 20 Mei 2013 CV. Tuah Jaya Lestarindo 98,050,000.00 22-Mar-13 Tranfer Ke jakarta Subhan 1,000,000.00 13 20 Mei 2013 CV. Tuah Cot Sebati 114,120,000.00 22-Mar-13 Panjar Las Baut Adun Din 9,000,000.00 14 21 Mei 2013 CV. Perdana Jaya 97,260,000.00 23-Mar-13 Bayar CCTV Galaxy 7,500,000.00

21 Mei 2013 CV. Perdana Mulia 172,280,000.00 25-Mar-13 Idk Frm, sh 50,000,000.00 11 21 Mei 2013 CV. Aceh Mandiri 115,690,000.00 25-Mar-13 Tranfer Ke Medan Koko 10,000,000.00

22 Mei 2013 CV. Maulana Utama 129,200,000.00 25-Mar-13 Aspaltic Anto 25,000,000.00 25-Mar-13 P. A 265,000,000.00 26-Mar-13 Bayar Sisa Ban Damp Truck Arena Ban 4,850,000.00 26-Mar-13 Bayar Ban Panther Truck Arena Ban 1,180,000.00 27-Mar-13 Skat Ruangan Alindra 300,000.00 27-Mar-13 Insentif Bln 1-3 Chalid 9,000,000.00 28-Mar-13 OP M.Iqbal 100,000,000.00 28-Mar-13 Panjar Ke 6 M. Syafiei 10,000,000.00 30-Mar-13 Rapat Dinduk 150,000.00 4-Apr-13 Panjar Ke 7 M. Syafiei 10,000,000.00 4-Apr-13 Operasional M. Iqbal 51,540,000.00 5-Apr-13 Aspaltic Anto 50,000,000.00 5-Apr-13 Aspal KOKO 44,000,000.00 5-Apr-13 Panjar Damija Amiruddin 10,000,000.00 5-Apr-13 Panjar Damija Wahyu 25,000,000.00 8-Apr-13 Kemedan chalid 550,000.00

10-Apr-13 Sewa Rumah Kabong Supriadi 2,500,000.00 10-Apr-13 PanJar LS Supriadi 1,000,000.00 10-Apr-13 Lunas Pengelasan Baut Adundin 21,060,000.00 11-Apr-13 Panjar Ke 7 M. Syafiei 10,000,000.00 12-Apr-13 Calang+Tamu Balai Chalid 350,000.00 12-Apr-13 Operasional M.Iqbal 30,000,000.00 12-Apr-13 Lunas Damija Km. 125 - KM. 150 M. Alif 8,858,000.00 15-Apr-13 Sewa Tanah di Merbo T. Khaharuddin 10,000,000.00 17-Apr-13 Lunas Damija Km. 61 - KM. 125 Wahyu 1,398,000.00 16-Apr-13 Balai 5,200,000.00 16-Apr-13 Pringer Print 5,250,000.00 19-Apr-13 Operasional M.Iqbal 30,000,000.00 19-Apr-13 Panjar Ke 8 M. Syafiei 10,000,000.00 19-Apr-13 Panjar Ls Edi 1,000,000.00 19-Apr-13 Panjar Ls Marzuki 500,000.00 23-Apr-13 Panjar Ls (Uang Makan) Supriadi 500,000.00 24-Apr-13 Operasional M.Iqbal 4,900,000.00 24-Apr-13 Beli Infokus 3,900,000.00 25-Apr-13 Panjar Ke 9 M. Syafiei 20,000,000.00 25-Apr-13 Kelap Chalid 200,000.00 26-Apr-13 Aspaltic Anto 20,000,000.00 26-Apr-13 Lunas Damija Amiruddin 400,000.00 26-Apr-13 Panjar Damija 1 Alif 1,000,000.00 26-Apr-13 Op utk Afrizal (Opnam Jbt) M. Iqbal 500,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

26-Apr-13 Op M. Iqbal 30,000,000.00 30-Apr-13 Panjar Ke 10 M. Syafiei 10,000,000.00 30-Apr-13 LS Pengawas Edi+hendri+mar+supr 10,000,000.00 30-Apr-13 Lunas Damija Amiruddin 7,520,000.00 3-May-13 Beli kamera 1 Bh M. Iqbal 2,500,000.00 3-May-13 Sewa Excavator Via Alindra 17,680,000.00

Mobilisasi Via Alindra 6,000,000.00 Honor Satpam Via Alindra 4,600,000.00 Trado Via Alindra 3,000,000.00 Op. Cruser Via Alindra 2,500,000.00 Org Kerja 2 org x 14 Hari Via Alindra 19,600,000.00 Mekanik Via Alindra 350,000.00

3-May-13 KOKO 5,000,000.00 3-May-13 Panjar Gaji Via Ova 12,000,000.00

3-May-13 600,000.00 3-May-13 Rapat PPK 100,000.00 3-May-13 Lemari Via Ova 3,000,000.00 4-May-13 Idk Frm, sh 25,000,000.00 6-May-13 Aspaltic Anto 20,000,000.00

Panjar Ke 11 M. Syafiei 10,000,000.00 Panjar Ke 12 M. Syafiei 10,000,000.00

6-May-13 Acara di Medan Sriy+Zaet 800,000.00 7-May-13 Camera 4 Unit Chalid 6,900,000.00

10-May-13 Op M. Iqbal 10,000,000.00 11-May-13 Op 1 Abrasi Pantai Andris 21,000,000.00 12-May-13 KE Lapangan Chalid + Deni 200,000.00 13-May-13 Op 2 Abrasi Pantai Andris 30,000,000.00 13-May-13 Panjar Ke 13 M. Syafiei 10,000,000.00 13-May-13 Panjar Ke 1 Amiruddin 2,500,000.00 14-May-13 Op 3 Abrasi Pantai Andris 20,000,000.00 14-May-13 Insentif Bln 4 Chalid 3,000,000.00 14-May-13 Op M.Iqbal 6,000,000.00 14-May-13 Sriy Blai 500,000.00 15-May-13 Op M.Iqbal 10,000,000.00 15-May-13 Lunas Damija 69+000 - 82+000 Wahyu 6,410,000.00 16-May-13 Panjar Ke 14 M. Syafiei 20,000,000.00 17-May-13 Panjar Damija M. Alif 1,000,000.00 17-May-13 Perbaikan Honda Afrizal 930,000.00

17-May-13Lunas M. Alif 7,000,000.00

18-May-13 Lembur 200,000.00 20-May-13 DP Pasangan Batu Syarwani 50,000,000.00 20-May-13 Beli Aspal M. Iqbal 15,000,000.00 20-May-13 Lunas Pengecatan Pribu M. Syafiei 32,015,000.00 20-May-13 Honda Marzuki Via Alindra 2,400,000.00 20-May-13 Pebaikan Mobil Via Alindra 10,000,000.00 20-May-13 P"al 180,000,000.00 20-May-13 Insentif staf 18,550,000.00 21-May-13 Beli Aspal M. Iqbal 15,000,000.00 21-May-13 Operasional M. Iqbal 1,000,000.00 22-May-13 Operasional M. Iqbal 10,000,000.00 baru

Bantu Pemberkasan Subhan + koko + Ida

Damija 150+000 - 156+000 & 176+00 - 187+000 (Pot.3)

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

23-May-13 Bayar Tiket 4,995,000.00

24-May-13 Amiruddin 10,660,000.00 24-May-13 Op +Gaji Pekerja + LL M. Iqbal 70,000,000.00 24-May-13 KOKO KOKO 5,000,000.00 24-May-13 Service Printer 420,000.00 24-May-13 Lembur 200,000.00 24-May-13 Panjar Ke 1 (Panga) M. Syafiei 5,000,000.00 24-May-13 Panjar Damija M. Alif 1,000,000.00 27-May-13 Transfer M. Iqbal 5,000,000.00 27-May-13 Ban panter 5,000,000.00 28-May-13 Medan Chalid 1,500,000.00 29-May-13 Byr Aspal indrwan nusa 145,000,000.00 29-May-13 Onkos Kirim Aspal M.iqbal 2,300,000.00 tdk ada di iqbal 30-May-13 Panjar Ke 2 (Panga) M. Syafiei 10,000,000.00 30-May-13 Pinjaman Gogo 3 tu PDA 8,250,000.00 30-May-13 Lembur 500,000.00 30-May-13 OP Alindra 6,000,000.00 31-May-13 Pebaikan Mobil Via Alindra 10,000,000.00 1-Jun-13 Panjar Pas. Batu Syawani Syarwani 60,000,000.00 1-Jun-13 Op M. Iqbal 75,000,000.00 1-Jun-13 Panjar Damija M. Alif 1,000,000.00 4-Jun-13 Insentif Bln 5 Chalid 3,000,000.00 4-Jun-13 Beli Printer 550,000.00 4-Jun-13 Panjar 3 Jembatan Panga M. Syafiei 10,000,000.00 4-Jun-13 Lunas Damija ( 102-120) Wahyu 14,250,000.00 5-Jun-13 Lunas Damija ( 130-150) M.Alif 6,400,000.00 5-Jun-13 Bantuan Berobat Marzuki 500,000.00

Damija 19+000 - 30+000 & 44+000 - 61+000 (Pot.4)

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

7-Jun-13 Panjar 4 Jembatan Panga M. Syafiei 10,000,000.00 Sisa yang lalu 76,054,000.00 7-Jun-13 Bronjong Dedy Jkrt 115,000,000.00

10 Juni 2013 CV. Aceh Brother 132,734,580.00 Geotek Dedy Jkrt 9,000,000.00 10 Juni 2013 CV. Meutuah 97,374,420.00 Ke jkrt Chalid 5,000,000.00 11 Juni 2013 CV. Panca Jorong 174,300,000.00 Beli Printer Chalid 1,300,000.00 12 Juni 2013 CV. Cantika 83,300,000.00 17-Jun-13 Panjar 1 Damija (30-44) Amiruddin 3,000,000.00 21 Juni 2013 CV. Meudang 112,700,000.00 18-Jun-13 Panjar 1 Pas.Batu 28 Syarwani 30,000,000.00 8 Juli 2013 Pembayaran Pinjaman Taufik 8,250,000.00 18-Jun-13 Kecalang Chalid 375,000.00

Tambahan dari Kontrak 31,012,000.00 19-Jun-13 Panjar 5 Jembatan Panga M. Syafiei 10,000,000.00 19-Jun-13 OP M.iQbal 120,000,000.00 19-Jun-13 Idk FHm 100,000,000.00 20-Jun-13 beLI Brankas Chalid 2,900,000.00 20-Jun-13 Ls Afrizal 2,500,000.00 20-Jun-13 Ls Marzuki 2,000,000.00 20-Jun-13 Ls Hendri 2,500,000.00 20-Jun-13 Ls Edy 2,000,000.00 20-Jun-13 Ls Supri 2,000,000.00 21-Jun-13 Panjar 6 Jembatan Panga M. Syafiei 15,000,000.00 21-Jun-13 Lunas Damija (30-44) Amiruddin 3,600,000.00 21-Jun-13 Bantuan Staf 5,600,000.00 21-Jun-13 Kecalang Chalid 350,000.00 26-Jun-13 Op M. iqbal 80,000,000.00 27-Jun-13 Panjar Damija Wahyu 3,000,000.00 27-Jun-13 OP AMP M. Alindra 2,400,000.00 1-Jul-13 Kemedan Chalid 1,200,000.00 1-Jul-13 Lunas Damija (16 km) M. Alif 7,200,000.00 1-Jul-13 Spare Part KOKO 2,280,000.00 2-Jul-13 Spare Part KOKO 3,500,000.00 3-Jul-13 Insentif Bln 6 Chalid 3,000,000.00 3-Jul-13 Lunas Jembatan Panga M. Syafiei 14,500,000.00 4-Jul-13 Mgg 48,050,000.00 4-Jul-13 op M.iQbal 74,000,000.00 4-Jul-13 Panjar Damija Wahyu 9,220,000.00 8-Jul-13 Aspal Tik Anto 6,800,000.00 8-Jul-13 Ls Afrizal 2,500,000.00 8-Jul-13 Ls Marzuki 2,500,000.00 8-Jul-13 Ls Hendri 2,500,000.00 8-Jul-13 Ls Edy 2,500,000.00 8-Jul-13 Ls Supri 2,500,000.00 8-Jul-13 Lunas Damija Wahyu 4,850,000.00

17-Jul-13 Chalid 650,000.00 20-Jul-13 Ke Calang + Buka Puasa + BBM Chalid 450,000.00

Sub. Total 715,725,000.00 715,725,000.00 -

Ke Calang + Buka Puasa Org Harian + BBM

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

kontrak

Nagah Berlian 3,000,000.00 Lia Sari Indah 10,000,000.00 Adhya 5,000,000.00 Rekayasa 5,000,000.00 Pilar Jurung 5,000,000.00 Budi 3,000,000.00

6-Aug-13 KM 125 (SPK) 15,000,000.00 25-Oct-13 BAlam (Kontrak) 7,500,000.00

8 Juli 2013 Menutupi Kekurangan Rutin 31,012,000.00 28-Jul-13 Rekayasa (ls) 10,000,000.00 14-Sep-13 Ls Bulan Agustus (6 org) 15,000,000.00 28-Jul-13 Adya 2,000,000.00 10-Oct-13 Ls Bulan September (6 org) 15,000,000.00 1-Aug-13 Rekayasa (ls) 2,500,000.00 4-Nov-13 Ls Bulan Oktober (6 org) 15,000,000.00 1-Aug-13 Lia Sari (ls) 7,500,000.00 11-Dec-13 Ls Bulan nOPEMBER (5 org) 12,500,000.00 1-Aug-13 Nagah (ls) 1,500,000.00 2-Aug-13 Pilar Jurung (ls) 2,500,000.00 12-Dec-13 Pinjam Chalid 11,500,000.00

28-Dec-13 Panjar Edy 500,000.00 3-Oct-13 Gogo1 (ls) 7,500,000.00 31 Des 2013 Ls Bulan Des 1 Org Havist 2,500,000.00

14-Oct-13 Gogo1 (ls) 5,000,000.00 1-Jan-14 Ls Bulan Des 4 Org 10,000,000.00 29-Oct-13 GOGO 1 (LS) 7,500,000.00 2-Mar-14 Pnjar Ls Bulan Feb 6 Org 6,000,000.00 29-Oct-13 Rekayasa (ls) 2,500,000.00 18/12/2013 LS KM 125 30,000,000.00 25-Jan-14 LS KM 125 15,000,000.00

Sub. Total 147,000,000.00 119,012,000.00 27,988,000.00

KET.

Blm Buat Kwitans

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

Utk pal Dar Utk pal Dar

KET.

Tanggal Laporan Ke P'alfakih

tdk ada di iqbal

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 23 Juli 2013 CV. Demi Rakyat 94,500,000.00 2 23 Juli 2013 CV. Semangat Baru 171,200,000.00 24-Jul-13 Panjar Ke 1Kr. Saber M. Syafiei 30,000,000.00 3 31 Juli 2013 CV. Khaisha 113,000,000.00 24-Jul-13 Panjar Damija M.Alif 1,000,000.00 4 31 Juli 2013 CV. Aceh Brother 105,000,000.00 24-Jul-13 Panjar Damija Husen 1,000,000.00 5 2 Agst 2013 CV. Talenta 173,800,000.00 24-Jul-13 Panjar Damija Amir 1,500,000.00 6 2 Agst 2013 CV. Data Kudrat 173,350,000.00 29-Jul-13 Lunas Damija Wahyu 3,820,000.00

29-Jul-13 Bayar Aspal Indrawan Nusa 17,000,000.00 31-Jul-13 IDK FrM 100,000,000.00 31-Jul-13 Panjar Pas.Batu Syarwani 50,000,000.00 31-Jul-13 Panjar Pas.Batu Jefri 5,000,000.00 31-Jul-13 Panjar Pas.Batu Yan 20,000,000.00 31-Jul-13 Persiapan Lebaran M. Iqbal 10,000,000.00 31-Jul-13 OP. Kerja M. Iqbal 30,000,000.00 31-Jul-13 LS. Pengawas 12,500,000.00 31-Jul-13 THR 87,250,000.00 2-Aug-13 Damija Husen Via Alif 6,880,000.00 5-Aug-13 Lunas Kr. Saber M. Syafiei 69,190,000.00 6-Aug-13 Lunas Damija Amir 9,370,000.00 2-Aug-13 Lunas Damija (125 - 187) Alif 14,660,000.00 2-Aug-13 Gaji Pekerja (op buras) M. Iqbal 41,400,000.00 2-Aug-13 Ac 20,000,000.00 2-Aug-13 PA 230,000,000.00 2-Aug-13 Pinjaman Alif 13,000,000.00 12-Aug-13 Insentif Bulan 7 Ac 3,000,000.00 19-Aug-13 BBM Tenom chalid 425,000.00 20-Aug-13 OP. Kerja M.iqbal 17,000,000.00

Sub. Total 830,850,000.00 789,425,000.00 41,425,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 20-Aug-13 Sisa Sd. 20 Agustus 2013 41,425,000.00 22-Aug-13 Blaai 4,000,000.00 2 20-Aug-13 CV. New Montes 174,500,000.00 22-Aug-13 Eskalasi 5,000,000.00 3 23-Aug-13 CV. Tuah Jaya Lestarindo 166,200,000.00 23-Aug-13 Pa 160,000,000.00 4 26-Aug-13 Storan 1 Pinjaman M.Alif 3,000,000.00 26-Aug-13 Lunas Damija (125 - 130) M.Alif 2,350,000.00 5 CV. Panca Jurong 43,940,000.00 26-Aug-13 Panjar 1 Damija Husen (30 - 90) M.Alif 1,000,000.00

CV. Perdana Mulya 78,678,000.00 26-Aug-13 Op M.Iqbal 70,000,000.00 CV. Maulana Utama 114,112,000.00 26-Aug-13 AC 10,000,000.00

27-Aug-13 Kemdan Ac 2,000,000.00 CV. Cantika 47,791,000.00 1-Sep-13 koko 5,000,000.00 CV. Tuah Cot Sebati 171,500,000.00 2-Sep-13 Idk FHM 100,000,000.00

3-Sep-13 LS pengawas 6 org 15,000,000.00 3-Sep-13 LS ADM Rutin 4 org (Ova+Den+Rol+ida 3,000,000.00 3-Sep-13 Panjar 1 Damija Alif (154 - 187) M.Alif 1,000,000.00 4-Sep-13 Lunas Damija Husen (30 - 90) M.Alif 4,170,000.00 4-Sep-13 Bayar Tiket Ke mEdan 1,300,000.00 4-Sep-13 Panjar 1 Damija Amir 2,000,000.00 5-Sep-13 Bantuan batminton Rendra 750,000.00 6-Sep-13 Hotel+Lapangan+makan (Tamu Lintas) 1,300,000.00 6-Sep-13 Ban Panther dan Ford 1,500,000.00 6-Sep-13 Insetif Bulan 8 3,000,000.00 8-Sep-13 Op M. iqbal 25,600,000.00 8-Sep-13 Pindah Alat di Merbo M. Alindra 26,000,000.00 8-Sep-13 Onkos Pem. Crane M. Alindra 9,000,000.00 10-Sep-13 Lunas Damija 68-120 dan saluran WAHYU 13,220,000.00 11-Sep-13 Lembur 250,000.00 12-Sep-13 Lembur 100,000.00 13-Sep-13 Ke lhong dengan pak hilal 200,000.00 13-Sep-13 Lembur 200,000.00 14-Sep-13 Lembur 50,000.00 15-Sep-13 Linstrik 200,000.00 17-Sep-13 lUNAS Damija Amir 12,570,000.00 17-Sep-13 Linstrik 500,000.00 17-Sep-13 lUNAS Damija Alif 6,520,000.00 17-Sep-13 Pinjaman utk rambu paket Transfer Akmizal 6,100,000.00 18-Sep-13 Ke calang 300,000.00 19-Sep-13 Beli Bronjong 300 bh 72,000,000.00 25-Sep-13 Idk FHM 25,000,000.00 28-Sep-13 Lunas Damija 7 Km WAHYU 3,290,000.00 30-Sep-13 Bawa Tamu (Wartawan) 700,000.00 1-Oct-13 Koko 50,000,000.00 2-Oct-13 10,000,000.00 3-Oct-13 Panjar Pem. Lahan Transfer Jkrt 18,750,000.00 3-Oct-13 Op Prices M. Alindra 4,100,000.00 3-Oct-13 Insetif Bulan 9 (Rutin) Chalid 3,000,000.00 5-Oct-13 Pajar Damija Husen Alif 1,000,000.00

Sub. Total 841,146,000.00 681,020,000.00 160,126,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

14-Sep-13 CV. Tati 62,950,000.00 14-Sep-13 CV. Meutuah 101,600,000.00 6-Oct-13 THR 42,750,000.00

7-Oct-13 Mie Kepiting Rombongan Pak S3ta 1,299,000.00 Sisa sd 5 Oktober 160,126,000.00 8-Oct-13 Op+Material Aspal M. Alindra 25,430,000.00

21-Nov-13 CV. Tati 153,222,225.00 8-Oct-13 Op Pekerja M. Alindra 19,500,000.00 26-Nov-13 CV. Aceh Brother 119,408,250.00 8-Oct-13 OP Aspal (BBM) M. Alindra 57,600,000.00 29-Nov-13 CV. Semangat Baru 151,954,725.00 8-Oct-13 Ke Mdn Chalid 3,200,000.00 29-Nov-13 CV. Aceh Mandiri 137,036,250.00 8-Oct-13 Insentif Staf teknik 4 Org 3,000,000.00 29-Nov-13 CV. Nurah Jaya 166,282,350.00 8-Oct-13 OP Via Afrizal Afrizal 27,340,000.00 2-Dec-13 CV. Panca Juroeng 148,893,225.00 8-Oct-13 OP Via M. Alif M.Alif 52,390,000.00 3-Dec-13 CV. Semangat Baru 34,701,225.00 8-Oct-13 OP Perbaikan Becak M. Alindra 2,900,000.00 3-Dec-13 SPBU 194,465,700.00 8-Oct-13 Alat AMP KOKO 3,750,000.00 12-Dec-13 CV. Perdana Mulya 96,271,500.00 11-Oct-13 Lunas Damija Husen (30 - 90) M. Alif 2,820,000.00 12-Dec-13 CV. Perdana Mulya 122,184,525.00 11-Oct-13 Lunas Damija Wahyu WAHYU 6,880,000.00

1,649,095,975.00 13-Oct-13 OP dan Perbaikan Mobil M. Alindra 15,600,000.00 Aspal 558,386,748.00 17-Oct-13 Kenduri Amp M. Alindra 10,000,000.00 Kabong 2 106,692,888.00 Kabong 3 98,710,860.00 Gogo 1 300,000,000.00 7-Nov-13 Perbaikan Ford 16 M. iqbal 5,068,000.00 Gogo 3 52,983,000.00

23-Oct-13 Beli Kerosin (Aspal) M.Alif 8,800,000.00 Marka 3,478,000.00 23-Oct-13 Besuk M. Iqbal 1,000,000.00 Kabong 2 23-Oct-13 Besuk Edy 1,500,000.00 Kabong 3Gogo 1 23-Oct-13 Pambuatan Dinamo AMP Yusuf 30,000,000.00 Gogo 3 3,478,000.00 27-Oct-13 Op+ Beli Aspal M. Alindra 10,000,000.00

30-Oct-13 Op+ Beli Aspal M. Alindra 15,000,000.00 Rambu 3,000,000.00 2-Nov-13 Insetif Bulan 10 (Rutin) Chalid 3,000,000.00 Kabong 2 1,500,000.00 2-Nov-13 Op+ Beli Aspal M. Alindra 10,000,000.00 Kabong 3 1,500,000.00 4-Nov-13 Sisa Minus OP Aspal M. Alif 5,294,000.00 Gogo 1 7-Nov-13 Survey M. Alif 500,000.00 Gogo 3 - 7-Nov-13 Op+ Beli Aspal M. Alindra 13,000,000.00

8-Nov-13 Op+ Beli Aspal M. Alindra 10,000,000.00 Aspal tick 85,940,000.00 8-Nov-13 OP Ke teunom Afrizal 1,000,000.00 Kabong 2 58,820,000.00 8-Nov-13 Panjar Damija M. Alif 1,000,000.00 Kabong 3 8-Nov-13 Panjar Aspal ABS 60,000,000.00 Gogo 1 27,120,000.00 11-Nov-13 Op+ Beli Aspal M. Alindra 25,850,000.00 Gogo 3 - 12-Nov-13 OP Aspal M. Alindra 6,650,000.00

15-Nov-13 Op.. Saluran M. Alif 2,000,000.00 Sisa Pak Jol 19-Nov-13 OP Aspal M. Alindra 15,000,000.00

18-Nov-13 Op.. Saluran M. Alif 1,000,000.00 18-Nov-13 Pek Bronjong Syarwani 25,000,000.00

CV. MEUTUAH 62,740,000.00 18-Nov-13 Panjar Damija M. Alif 1,000,000.00 CV. TUAH COT SEBATI 173,250,000.00 21-Nov-13 OP Aspal M. Alindra 25,000,000.00

23-Nov-13 op M. Alindra 2,500,000.00 CV. PERDANA JAYA 171,080,000.00 23-Nov-13 Tiket 9,500,000.00 CV. MEUDANG JAYA 113,085,000.00 25-Nov-13 op M. Alif 1,500,000.00

25-Nov-13 Insentif Staf teknik 4 Org (Lembur) 2,000,000.00 520,155,000.00 27-Nov-13 OP Aspal M. Alindra 20,000,000.00

27-Nov-13 Upah Pas Bronjong Syarwani 30,000,000.00 2014 30-Nov-13 Op. Aspal M. Alindra 26,900,000.00

Demi Rakyat 135,610,000.00 IDK FHM 100,000,000.00 Putro Karya 161,460,000.00 30-Nov-13 Lunas Damija Wahyu 1,398,000.00 CIPTA MIGA PESADA 154,420,000.00 30-Nov-13 Lunas Damija Amir 5,000,000.00

30-Nov-13 Pa 400,000,000.00 ULE BALANG 99,090,000.00 2-Dec-13 Op, Aspal 20,000,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

7-Mar-14 Prafico 70,700,000.00 3-Dec-13 Panjar Damija Alif 1,000,000.00 BETINDO PERKASA 159,700,000.00 Pinjaman Jefri Via Alif 1,000,000.00 SAFA EDIFICO 124,250,000.00 Pinjaman Jamil Via Alif 2,000,000.00 SAMUDERA HIJAU 150,650,000.00 Op, Pembesihan Saluran Alif 1,616,000.00 KOTA PEMUDA 95,000,000.00 3-Dec-13 Insetif Bulan 11 (Rutin) Chalid 3,000,000.00 Tati Perdana 113,000,000.00 10-Dec-13 Panjar Damija Alif 1,000,000.00 Tuah Jaya L 151,800,000.00 10-Dec-13 Ban Innova 3,100,000.00 Keisha 101,600,000.00 11-Dec-13 Op Patching Alif 5,000,000.00 Chantika 59,800,000.00 11-Dec-13 Panjar Marka Adriansyah 4,000,000.00 Harapan Jaya 152,200,000.00 12-Dec-13 Insentif Dian 1,500,000.00

7 mei 2014 42,556,826.00 42,500,000.00 12-Dec-13 op Aspal M.Alindra 53,260,000.00 (sisa p' jol) 12-Dec-13 Rental Mobil

1,771,780,000.00 1 Unit x 1 Hari 350,000.00 1 Unit x 1 Hari 300,000.00 1 Unit x 2 Hari 600,000.00 BBM 870,000.00 Insentif supir 400,000.00 Lain2 400,000.00

15-Dec-13 Op, Aspal M.Alindra 20,000,000.00 16-Dec-13 Lunas Damija Amir 6,110,000.00 17-Dec-13 Panjar 1 Damija (Asri) 1,000,000.00 18-Dec-13 Op Foto Damija dan Survey 1,000,000.00 19-Dec-13 Op, Aspal M.Alindra 35,300,000.00 23-Dec-13 Op, Aspal M.Alindra 15,000,000.00 25-Dec-13 Op, Aspal M.Alindra 42,800,000.00 25-Dec-13 Rpat Oe Dimedan *sumbangan 2,500,000.00 25-Dec-13 Haraian di Medan + tiket 1,200,000.00 27-Dec-13 Panjar 1 Damija Amir 1,000,000.00 27-Dec-13 Op, Aspal M.Alif 5,100,000.00 27-Dec-13 Survey Afrizal 700,000.00 27-Dec-13 Pnjar Kerja edy 500,000.00 27-Dec-13 Lunas Damija Wahyu 8,020,000.00 27-Dec-13 Op, Patching M.Alif 5,100,000.00 27-Dec-13 Op, Aspal M.Alindra 11,000,000.00 30-Dec-13 Fadli dan Hendra 600,000.00 30-Dec-13 Pelunasan Marka Adriansyah 15,121,600.00 31-Dec-13 Op, Aspal M.Alif 5,726,000.00 1-Jan-14 Upah Pekerja M.Alindra 30,000,000.00 2-Jan-14 Lunas Damija (Asri) M.Alif 14,770,000.00 2-Jan-14 Lunas Damija (Husen) M.Alif 8,840,000.00 2-Jan-14 Lunas Damija Wahyu 8,730,000.00 3-Jan-14 Pembuatan Rambu M. Alif 3,350,000.00 7-Jan-14 Ketenom Chalid 600,000.00 7-Jan-14 Insetif Bulan 12 (Rutin) Chalid 3,000,000.00 9-Jan-14 Op, Aspal M. Alif 3,950,000.00 12-Jan-14 Byr Upah Harian Pekerja M. Alif 13,720,000.00 13-Jan-14 Op M. Iqbal 17,250,000.00 13-Jan-14 Aspaltick Mardianto 60,000,000.00 16-Jan-14 Lunas Damija Amir 12,220,000.00 17-Jan-14 Op M. Iqbal 5,000,000.00 17-Jan-14 Fahmi (TPT) 30,000,000.00 22-Jan-14 Perbaikan Listrik Ktr Lama 600,000.00 22-Jan-14 ROOM..in work shop FHM 15,000,000.00 23-Jan-14 Beli Bahan Buat Rak Deni 3,000,000.00 24-Jan-14 Beli Rompi 910,000.00 25-Jan-14 Op M.Iqbal 5,000,000.00 25-Jan-14 Mkn dng P"Risman 233,000.00 5-Feb-14 Beli Bahan Buat Rak Deni 2,000,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

6-Feb-14 Sri b4l41 500,000.00 6-Feb-14 Inztal Kop. Nova + Kibot ida 300,000.00 6-Feb-14 Damija Amir 500,000.00 6-Feb-14 Ban Ford 3,150,000.00 6-Feb-14 Op M.Iqbal 2,000,000.00 7-Feb-14 PT. Aspal bangun 45,800,000.00 7-Feb-14 Rapat 100,000.00 10-Feb-14 Rapat Induk 100,000.00 10-Feb-14 Damija Wahyu 3,760,000.00

12-Feb-14 Op M. Iqbal 80,000,000.00 14-Feb-14 IDK 50,000,000.00 14-Feb-14 Ongkos Buat Rak Deni 1,500,000.00 14-Feb-14 Panjar damija Husen + Asri M. Alif 2,000,000.00 19-Feb-14 Gaji Harian Pek,OP dan Satpam M. Alindra 55,155,000.00 19-Feb-14 Lunas Damija Wahyu 3,910,000.00 19-Feb-14 Beli Spare part KOKO 5,200,000.00 24-Feb-14 OP M. Iqbal 50,000,000.00 25-Feb-14 OP M. Iqbal 50,000,000.00 26-Feb-14 Pinjaman Kerja Awiwin 100,000.00 27-Feb-14 Service Printer dan Beli Mose M.Iqbal 1,500,000.00 26-Feb-14 Tiket Sri 5,650,000.00 27-Feb-14 Servis Komputer M.Iqbal 1,500,000.00 27-Feb-14 Panjar Pas Linstrik M. Nur 500,000.00 28-Feb-14 Lunas Dmija Alindra M. Alif 9,259,000.00 28-Feb-14 Lunas Dmija Husen M. Alif 5,110,000.00 28-Feb-14 Lunas Dmija Asri M. Alif 9,840,000.00 2-Mar-14 Btam Chalid 10,000,000.00 2-Mar-14 Staf BLAi & dep di Btam 4,300,000.00 7-Mar-14 Aspaltick Mardianto 22,000,000.00 7-Mar-14 OP M.Iqbal 14,000,000.00 10-Mar-14 OP M.Iqbal 64,000,000.00 10-Mar-14 Seting CCTV ADLY 1,550,000.00 10-Mar-14 Vie Tt SPBU Lamtemen Via Nova 1,500,000.00 13-Mar-14 idk Jufr 35,000,000.00 13-Mar-14 ADM Induk dan Pokja 6 SPK 3,300,000.00 13-Mar-14 Engssel 200,000.00 13-Mar-14 Servis Printer 2 Unit 450,000.00 16-Mar-14 KE Teunom 630,000.00 17-Mar-14 OP M. Iqbal 10,000,000.00 19-Mar-14 Perbaikan dan Bongkar Pasang Ac 2,925,000.00 19-Mar-14 OP Aspal (BBM) M. Alidra 10,000,000.00 19-Mar-14 Beli Aspal Syahrul ABS 45,300,000.00 19-Mar-14 Beli Aspal Syahrul 78,117,600.00 20-Mar-14 Spare Part Vibro dan Loader KOKO 10,000,000.00 20-Mar-14 M. Iqbal 55,000,000.00 24-Mar-14 OP Ke teunom M. Iqbal 15,000,000.00 28-Mar-14 Beli Ban Loader KOKO 13,000,000.00 28-Mar-14 Op Ambil Foto damija M. Alif 600,000.00 28-Mar-14 Pajak Alat dan AmP 58,458,250.00 31-Mar-14 Panjar damija (Asri & M. Alindra) M. Alif 2,000,000.00 1-Apr-14 Minyak M.Iqbal 40,000,000.00 1-Apr-14 OP M.Iqbal 10,000,000.00 1-Apr-14 Idk FHM 50,000,000.00 3-Apr-14 OP M.Iqbal 40,000,000.00 4-Apr-14 Tiket Batam - BNA 1,030,000.00 4-Apr-14 Pinjaman OP M.Iqbal 5,000,000.00 4-Apr-14 service Mobil M. alindra 1,070,000.00

Gadril

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

4-Apr-14 BELI BBM PT. PASHA Jaya 58,725,500.00

7-Apr-14 Idk FHM 100,000,000.00

7-Apr-14 OP + Gardril M.Iqbal 159,000,000.00 7-Apr-14 Panjar Kerja Mardianto 25,000,000.00 10-Apr-14 Panjar Komputer Simbada 10,000,000.00 11-Apr-14 Panjar Komputer Simbada 10,000,000.00 14-Apr-14 Gendong Aspal+Insentif OP dll M. Alindra 60,000,000.00 15-Apr-14 MKN Siang dgn para PPK Punama Rasa 253,000.00 17-Apr-14 Panjar Pot Rumput Amir 1,000,000.00 18-Apr-14 Insentif Jufri 2,500,000.00 18-Apr-14 Lunas Aspal Syahrul ABS 19,823,000.00 19-Apr-14 Bayar BAN Arena Ban 16,770,000.00

20-Apr-14 Service Komputer dn Printer Nova 430,000.00 21-Apr-14 Lunas Damija, Alindra, wahyu M. Alif 22,132,000.00 22-Apr-14 Lunas Damija Amir 10,650,000.00 28-Apr-14 Rombongan Irjen

Makan Malam 340,000.00 BBM+ Insentif Muslim 500,000.00 Makan Siang 266,000.00 BBM INNOVA 300,000.00 MINUM 150,000.00

28-Apr-14 Fahmi (TPT) 15,206,000.00 28-Apr-14 OP M. Iqbal 100,000,000.00 30-Apr-14 Lunas Pekerjaan 2013 Mardianto 35,723,000.00 6-May-14 OP M. Iqbal 53,000,000.00 6-May-14 Hotel Irjen & tiket P'Al dari mdan Yan Induk 2,000,000.00 7-May-14 Panjar Damija M. Alif 3,000,000.00 9-May-14 Lunas Damija M. Alif 29,670,000.00

20-May-14 Medan Deni 2,000,000.00 20-May-14 Medan (hotel+tiket) Chalid 1,500,000.00 20-May-14 Beli Minyak Subsidi PT. Pasha 64,318,750.00 23-May-14 op M. Iqbal 10,000,000.00 24-May-14 op M. Iqbal 16,000,000.00 28-May-14 Panjar Anto Via M. Iqbal 25,000,000.00 28-May-14 Kirim ke koko untuk Idrawan Via Subhan 72,500,000.00 28-May-14 Kirim ke koko Via Subhan 10,000,000.00 30-May-14 Kirim ke koko Via Subhan 10,000,000.00 30-May-14 Panjar Rahmat Via M. Iqbal 25,000,000.00

2-Jun-14 M. ALIF 8,700,000.00 2-Jun-14 Panjar OP M. Iqbal 5,000,000.00 3-Jun-14 Trans Koko 13,000,000.00 4-Jun-14 Panjar OP (longsor) M. Iqbal 20,000,000.00 4-Jun-14 OP (longsor) (BBM+mkn pekerja dll) Chalid 1,200,000.00 6-Jun-14 Bayar Pekerja M. Alindra 13,800,000.00 9-Jun-14 Panjar OP M. Iqbal 39,000,000.00 10-Jun-14 Panjar OP M. Iqbal 21,000,000.00 12-Jun-14 Lembur 200,000.00 13-Jun-14 Lembur 150,000.00 13-Jun-14 Insenti+ Insenti rutin Nova 3,750,000.00 18-Jun-14 Trans Koko 5,000,000.00 Cek Kembali Ke BNI Karna tidak Masuk 18-Jun-14 Trans Koko 5,000,000.00 18-Jun-14 Makan Siang with Sek , Dinas 750,000.00

mesin

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

19-Jun-14 Panjar OP M. Iqbal 20,000,000.00 19-Jun-14 Panjar OP M. Iqbal 25,000,000.00 19-Jun-14 Insentif rutin Bulan 1s/d 5 Chalid 15,000,000.00 23-Jun-14 Lunas Damija M. Alif 16,640,000.00 23-Jun-14 Perbaikan Alat Berat M. Alindra 16,640,000.00

Sub. Total 4,591,835,723.00 ### 732,118,023.00

37,600,000.00 Kontrak dan LS 54,500,000.00 82,488,000.00 Rutin 732,118,023.00 732,118,023.00 Total 786,618,023.00 852,206,023.00 Saldo 301,733,000.00 301,733,000.00 Selisih 484,885,023.00 550,473,023.00

14-Mar-14 Panjar LS Bulan maret Dian 2,500,000.00 14-Mar-14 Panjar LS Bulan maret Havidz 1,000,000.00

hendri 1,000,000.00 Supriadi 1,000,000.00 Edy 1,000,000.00

14-Mar-14 Panjar LS Bulan maret Marzuki 1,000,000.00 19-Mar-14 Panjar LS Bulan maret Supriadi 1,000,000.00 9-Apr-14 LS Bulan maret Marzuki 2,500,000.00 9-May-14 LS Bulan April HENDRI 2,500,000.00 6-May-14 LS Bulan April Edy 2,500,000.00 6-May-14 LS Deni 1,000,000.00

17,000,000.00 kontrakWil. II.09D 5,000,000.00 Wil. II.09C 5,000,000.00 Wil. II.09A 15,000,000.00 Wil. II.09B 18,000,000.00 LSWil. II.09C 30-Dec-99 6,000,000.00 Wil. II.09A 22,500,000.00

71,500,000.00 Sisa 54,500,000.00

(27,340,000.00)

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

Tambahan

KET.

Tanggal Laporan Ke P'alfakih

25,940,000.00

15,206,000.00

KET.

Tanggal Laporan Ke P'alfakih

Tran Mandiri

Tran Mandiri

Tran bni

Tranfer BRI

KET.

Tanggal Laporan Ke P'alfakih

Tran bni

Cek Kembali Ke BNI Karna tidak Masuk

KET.

Tanggal Laporan Ke P'alfakih

439,500,000.00

cash

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 19 Maret 2013 CV. Cot Sebati 110,700,000.00 2 21 Maret 2013 CV. Semangat Baru 166,600,000.00 11-Mar-13 KE Lapangan Chalid 500,000.00 3 21 Maret 2013 CV. Muzulty 165,700,000.00 15-Mar-13 Panjar Ke 3 M. Syafiei 5,000,000.00 4 25 Maret 2013 CV. Talenta 170,170,000.00 15-Mar-13 Panjar Ke 1 Wahyu 1,500,000.00 5 3 April 2013 CV. Demi Rakyat 77,500,000.00 19-Mar-13 Op M.Iqbal 900,000.00 6 3 April 2013 CV. Perdana Jaya 173,900,000.00 20-Mar-13 Panjar Ke 4 M. Syafiei 10,000,000.00 7 3 April 2013 CV. Aceh Mandiri 112,900,000.00 20-Mar-13 Panjar Ke 3 Amir 2,500,000.00 8 3 April 2013 CV. Data Kudrat 161,900,000.00 21-Mar-13 Bayar Tiket Pesawat Sri Tanaka 6,500,000.00 9 4 Mei 2013 CV. Semangat Baru 78,900,000.00 21-Mar-13 Pengurusan Listrik Alindra 3,500,000.00 10 4 Mei 2013 CV. Talenta 78,000,000.00 21-Mar-13 Panjar Ke 2 Wahyu 2,500,000.00 11 4 Mei 2013 CV. Keisha Azura 90,700,000.00 21-Mar-13 Beli Printer Bayu 650,000.00

12 20 Mei 2013 CV. Tuah Jaya Lestarindo 98,050,000.00 22-Mar-13 Tranfer Ke jakarta Subhan 1,000,000.00 13 20 Mei 2013 CV. Tuah Cot Sebati 114,120,000.00 22-Mar-13 Panjar Las Baut Adun Din 9,000,000.00 14 21 Mei 2013 CV. Perdana Jaya 97,260,000.00 23-Mar-13 Bayar CCTV Galaxy 7,500,000.00

21 Mei 2013 CV. Perdana Mulia 172,280,000.00 25-Mar-13 Idk Frm, sh 50,000,000.00 11 21 Mei 2013 CV. Aceh Mandiri 115,690,000.00 25-Mar-13 Tranfer Ke Medan Koko 10,000,000.00

22 Mei 2013 CV. Maulana Utama 129,200,000.00 25-Mar-13 Aspaltic Anto 25,000,000.00 25-Mar-13 P. A 265,000,000.00 26-Mar-13 Bayar Sisa Ban Damp Truck Arena Ban 4,850,000.00 26-Mar-13 Bayar Ban Panther Truck Arena Ban 1,180,000.00 27-Mar-13 Skat Ruangan Alindra 300,000.00 27-Mar-13 Insentif Bln 1-3 Chalid 9,000,000.00 28-Mar-13 OP M.Iqbal 100,000,000.00 28-Mar-13 Panjar Ke 6 M. Syafiei 10,000,000.00 30-Mar-13 Rapat Dinduk 150,000.00 4-Apr-13 Panjar Ke 7 M. Syafiei 10,000,000.00 4-Apr-13 Operasional M. Iqbal 51,540,000.00 5-Apr-13 Aspaltic Anto 50,000,000.00 5-Apr-13 Aspal KOKO 44,000,000.00 5-Apr-13 Panjar Damija Amiruddin 10,000,000.00 5-Apr-13 Panjar Damija Wahyu 25,000,000.00 8-Apr-13 Kemedan chalid 550,000.00 10-Apr-13 Sewa Rumah Kabong Supriadi 2,500,000.00 10-Apr-13 PanJar LS Supriadi 1,000,000.00 10-Apr-13 Lunas Pengelasan Baut Adundin 21,060,000.00 11-Apr-13 Panjar Ke 7 M. Syafiei 10,000,000.00 12-Apr-13 Calang+Tamu Balai Chalid 350,000.00 12-Apr-13 Operasional M.Iqbal 30,000,000.00 12-Apr-13 Lunas Damija Km. 125 - KM. 150 M. Alif 8,858,000.00 15-Apr-13 Sewa Tanah di Merbo T. Khaharuddin 10,000,000.00 17-Apr-13 Lunas Damija Km. 61 - KM. 125 Wahyu 1,398,000.00 16-Apr-13 Balai 5,200,000.00 16-Apr-13 Pringer Print 5,250,000.00 19-Apr-13 Operasional M.Iqbal 30,000,000.00 19-Apr-13 Panjar Ke 8 M. Syafiei 10,000,000.00 19-Apr-13 Panjar Ls Edi 1,000,000.00 19-Apr-13 Panjar Ls Marzuki 500,000.00 23-Apr-13 Panjar Ls (Uang Makan) Supriadi 500,000.00 24-Apr-13 Operasional M.Iqbal 4,900,000.00 24-Apr-13 Beli Infokus 3,900,000.00 25-Apr-13 Panjar Ke 9 M. Syafiei 20,000,000.00 25-Apr-13 Kelap Chalid 200,000.00 26-Apr-13 Aspaltic Anto 20,000,000.00 26-Apr-13 Lunas Damija Amiruddin 400,000.00 26-Apr-13 Panjar Damija 1 Alif 1,000,000.00 26-Apr-13 Op utk Afrizal (Opnam Jbt) M. Iqbal 500,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

26-Apr-13 Op M. Iqbal 30,000,000.00 30-Apr-13 Panjar Ke 10 M. Syafiei 10,000,000.00 30-Apr-13 LS Pengawas Edi+hendri+mar+supr 10,000,000.00 30-Apr-13 Lunas Damija Amiruddin 7,520,000.00 3-May-13 Beli kamera 1 Bh M. Iqbal 2,500,000.00 3-May-13 Sewa Excavator Via Alindra 17,680,000.00

Mobilisasi Via Alindra 6,000,000.00 Honor Satpam Via Alindra 4,600,000.00 Trado Via Alindra 3,000,000.00 Op. Cruser Via Alindra 2,500,000.00 Org Kerja 2 org x 14 Hari Via Alindra 19,600,000.00 Mekanik Via Alindra 350,000.00

3-May-13 KOKO 5,000,000.00 3-May-13 Panjar Gaji Via Ova 12,000,000.00

3-May-13 600,000.00 3-May-13 Rapat PPK 100,000.00 3-May-13 Lemari Via Ova 3,000,000.00 4-May-13 Idk Frm, sh 25,000,000.00 6-May-13 Aspaltic Anto 20,000,000.00

Panjar Ke 11 M. Syafiei 10,000,000.00 Panjar Ke 12 M. Syafiei 10,000,000.00

6-May-13 Acara di Medan Sriy+Zaet 800,000.00 7-May-13 Camera 4 Unit Chalid 6,900,000.00 10-May-13 Op M. Iqbal 10,000,000.00 11-May-13 Op 1 Abrasi Pantai Andris 21,000,000.00 12-May-13 KE Lapangan Chalid + Deni 200,000.00 13-May-13 Op 2 Abrasi Pantai Andris 30,000,000.00 13-May-13 Panjar Ke 13 M. Syafiei 10,000,000.00 13-May-13 Panjar Ke 1 Amiruddin 2,500,000.00 14-May-13 Op 3 Abrasi Pantai Andris 20,000,000.00 14-May-13 Insentif Bln 4 Chalid 3,000,000.00 14-May-13 Op M.Iqbal 6,000,000.00 14-May-13 Sriy Blai 500,000.00 15-May-13 Op M.Iqbal 10,000,000.00 15-May-13 Lunas Damija 69+000 - 82+000 Wahyu 6,410,000.00 16-May-13 Panjar Ke 14 M. Syafiei 20,000,000.00 17-May-13 Panjar Damija M. Alif 1,000,000.00 17-May-13 Perbaikan Honda Afrizal 930,000.00

17-May-13Lunas M. Alif 7,000,000.00

18-May-13 Lembur 200,000.00 20-May-13 DP Pasangan Batu Syarwani 50,000,000.00 20-May-13 Beli Aspal M. Iqbal 15,000,000.00 20-May-13 Lunas Pengecatan Pribu M. Syafiei 32,015,000.00 20-May-13 Honda Marzuki Via Alindra 2,400,000.00 20-May-13 Pebaikan Mobil Via Alindra 10,000,000.00 20-May-13 P"al 180,000,000.00 20-May-13 Insentif staf 18,550,000.00 21-May-13 Beli Aspal M. Iqbal 15,000,000.00 21-May-13 Operasional M. Iqbal 1,000,000.00 22-May-13 Operasional M. Iqbal 10,000,000.00 baru

Bantu Pemberkasan Subhan + koko + Ida

Damija 150+000 - 156+000 & 176+00 - 187+000 (Pot.3)

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

23-May-13 Bayar Tiket 4,995,000.00

24-May-13 Amiruddin 10,660,000.00 24-May-13 Op +Gaji Pekerja + LL M. Iqbal 70,000,000.00 24-May-13 KOKO KOKO 5,000,000.00 24-May-13 Service Printer 420,000.00 24-May-13 Lembur 200,000.00 24-May-13 Panjar Ke 1 (Panga) M. Syafiei 5,000,000.00 24-May-13 Panjar Damija M. Alif 1,000,000.00 27-May-13 Transfer M. Iqbal 5,000,000.00 27-May-13 Ban panter 5,000,000.00 28-May-13 Medan Chalid 1,500,000.00 29-May-13 Byr Aspal indrwan nusa 145,000,000.00 29-May-13 Onkos Kirim Aspal M.iqbal 2,300,000.00 tdk ada di iqbal 30-May-13 Panjar Ke 2 (Panga) M. Syafiei 10,000,000.00 30-May-13 Pinjaman Gogo 3 tu PDA 8,250,000.00 30-May-13 Lembur 500,000.00 30-May-13 OP Alindra 6,000,000.00 31-May-13 Pebaikan Mobil Via Alindra 10,000,000.00 1-Jun-13 Panjar Pas. Batu Syawani Syarwani 60,000,000.00 1-Jun-13 Op M. Iqbal 75,000,000.00 1-Jun-13 Panjar Damija M. Alif 1,000,000.00 4-Jun-13 Insentif Bln 5 Chalid 3,000,000.00 4-Jun-13 Beli Printer 550,000.00 4-Jun-13 Panjar 3 Jembatan Panga M. Syafiei 10,000,000.00 4-Jun-13 Lunas Damija ( 102-120) Wahyu 14,250,000.00 5-Jun-13 Lunas Damija ( 130-150) M.Alif 6,400,000.00 5-Jun-13 Bantuan Berobat Marzuki 500,000.00

Damija 19+000 - 30+000 & 44+000 - 61+000 (Pot.4)

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

7-Jun-13 Panjar 4 Jembatan Panga M. Syafiei 10,000,000.00 Sisa yang lalu 76,054,000.00 7-Jun-13 Bronjong Dedy Jkrt 115,000,000.00

10 Juni 2013 CV. Aceh Brother 132,734,580.00 Geotek Dedy Jkrt 9,000,000.00 10 Juni 2013 CV. Meutuah 97,374,420.00 Ke jkrt Chalid 5,000,000.00 11 Juni 2013 CV. Panca Jorong 174,300,000.00 Beli Printer Chalid 1,300,000.00 12 Juni 2013 CV. Cantika 83,300,000.00 17-Jun-13 Panjar 1 Damija (30-44) Amiruddin 3,000,000.00 21 Juni 2013 CV. Meudang 112,700,000.00 18-Jun-13 Panjar 1 Pas.Batu 28 Syarwani 30,000,000.00 8 Juli 2013 Pembayaran Pinjaman Taufik 8,250,000.00 18-Jun-13 Kecalang Chalid 375,000.00

Tambahan dari Kontrak 31,012,000.00 19-Jun-13 Panjar 5 Jembatan Panga M. Syafiei 10,000,000.00 19-Jun-13 OP M.iQbal 120,000,000.00 19-Jun-13 Idk FHm 100,000,000.00 20-Jun-13 beLI Brankas Chalid 2,900,000.00 20-Jun-13 Ls Afrizal 2,500,000.00 20-Jun-13 Ls Marzuki 2,000,000.00 20-Jun-13 Ls Hendri 2,500,000.00 20-Jun-13 Ls Edy 2,000,000.00 20-Jun-13 Ls Supri 2,000,000.00 21-Jun-13 Panjar 6 Jembatan Panga M. Syafiei 15,000,000.00 21-Jun-13 Lunas Damija (30-44) Amiruddin 3,600,000.00 21-Jun-13 Bantuan Staf 5,600,000.00 21-Jun-13 Kecalang Chalid 350,000.00 26-Jun-13 Op M. iqbal 80,000,000.00 27-Jun-13 Panjar Damija Wahyu 3,000,000.00 27-Jun-13 OP AMP M. Alindra 2,400,000.00 1-Jul-13 Kemedan Chalid 1,200,000.00 1-Jul-13 Lunas Damija (16 km) M. Alif 7,200,000.00 1-Jul-13 Spare Part KOKO 2,280,000.00 2-Jul-13 Spare Part KOKO 3,500,000.00 3-Jul-13 Insentif Bln 6 Chalid 3,000,000.00 3-Jul-13 Lunas Jembatan Panga M. Syafiei 14,500,000.00 4-Jul-13 Mgg 48,050,000.00 4-Jul-13 op M.iQbal 74,000,000.00 4-Jul-13 Panjar Damija Wahyu 9,220,000.00 8-Jul-13 Aspal Tik Anto 6,800,000.00 8-Jul-13 Ls Afrizal 2,500,000.00 8-Jul-13 Ls Marzuki 2,500,000.00 8-Jul-13 Ls Hendri 2,500,000.00 8-Jul-13 Ls Edy 2,500,000.00 8-Jul-13 Ls Supri 2,500,000.00 8-Jul-13 Lunas Damija Wahyu 4,850,000.00

17-Jul-13 Chalid 650,000.00 20-Jul-13 Ke Calang + Buka Puasa + BBM Chalid 450,000.00

Sub. Total 715,725,000.00 715,725,000.00 -

Ke Calang + Buka Puasa Org Harian + BBM

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

kontrak

Nagah Berlian 3,000,000.00 8 Juli 2013 Menutupi Kekurangan Rutin 31,012,000.00 Lia Sari Indah 10,000,000.00 14 Septe 2013 Ls 6 Org 15,000,000.00 Adhya 5,000,000.00 Rekayasa 5,000,000.00 Pilar Jurung 5,000,000.00 11-Dec-13 LS 5 Pengawas 12,500,000.00 Budi 3,000,000.00

6-Aug-13 KM 125 (SPK) 15,000,000.00 12-Dec-13 Insentif Dian 1,500,000.00 25-Oct-13 BAlam (Kontrak) 7,500,000.00 28 Des 2013 Panjar Edy 500,000.00

Sisa MC B,alam 5,000,000.00

Rekayasa (ls) 10,000,000.00 31 Des 2013 Ls 1 Org Havist 2,500,000.00 Pilar Jurung (ls) 10,000,000.00 Panitia 45,500,000.00 Adya 2,500,000.00 Adya 2,000,000.00

1-Aug-13 Rekayasa (ls) 2,500,000.00 1-Aug-13 Lia Sari (ls) 7,500,000.00 1-Aug-13 Nagah (ls) 1,500,000.00 2-Aug-13 Pilar Jurung (ls) 2,500,000.00

3-Oct-13 Lia Sari (ls) 7,500,000.00 15-Aug-13 Budi (Peneliti Kontrak) 3,500,000.00 10-Oct-13 Gogo 3 (Peneliti Kontrak) 7,500,000.00 14-Oct-13 Kabong 3 (Peneliti Kontrak) 7,500,000.00 25-Oct-13 BAlam (Peneliti Kontrak) 7,500,000.00 29-Oct-13 GOGO 1 (LS) 7,500,000.00 25-Nov-13 GOGO 3 (PHO/FHO) 10,000,000.00 18-Dec-13 LS KM 125 30,000,000.00 20-Dec-13 GOGO 1 cs (PHO/FHO) 10,000,000.00

Sub. Total 129,500,000.00 108,512,000.00 20,988,000.00

KET.

Blm Buat Kwitans

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

Utk pal Dar Utk pal Dar

KET.

Tanggal Laporan Ke P'alfakih

tdk ada di iqbal

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 Jembatan Kr. Sabe 2,834.00 35,000.00 99,190,000.00 30,000,000.00 69,190,000.00

69,190,000.00

69,190,000.00

69,190,000.00

69,190,000.00

69,190,000.00

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

Tanda Tangan

Tanda Tangan

Tanda Tangan

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 10 Juni 2013 CV. Aceh Brother 132,734,580.00 2 10 Juni 2013 CV. Meutuah 97,374,420.00

Sub. Total 230,109,000.00 - ###

Sub. Total - - -

KET.

Tanggal Laporan Ke P'alfakih

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 Jembatan Panga 2,126.14 35,000.00 74,414,900.00 24-May-13 Panjar1 (Panga) M. Syafiei 5,000,000.00 69,414,900.00

30-May-13 Panjar2 (Panga) M. Syafiei 10,000,000.00 59,414,900.00

4-Jun-13 Panjar3 (Panga) M. Syafiei 10,000,000.00 49,414,900.00

11-Jun-13 Panjar 4 (Panga) M. Syafiei 10,000,000.00 39,414,900.00

19-Jun-13 Panjar 5 (Panga) M. Syafiei 10,000,000.00 29,414,900.00

12-Jun-13 Panjar 6 (Panga) M. Syafiei 15,000,000.00 14,414,900.00

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

Tanda Tangan

Tanda Tangan

Tanda Tangan

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 10,000,000.00

Uang Banyaknya : Sepuluh Juta rupiah,--

Untuk Pembayaran :

Melaboh, 16 April 2013Yang menerima :

Nama : T. KaharuddinPekerjaan : Alamat :

Lunas biaya sewa tanah di desa Ujung Tanjung Kec. Merebo Aceh Barat, untuk penempatan alat Satker PJN Prov. Aceh dari Tanggal 2 Feb 2013 sampai dengan tanggal 2 Agustus 2013 atau selama 2 (dua) tahun 6 (enam) bulan)

KUITANSI / BUKTI PEMBAYARAN

Lunas biaya sewa tanah di desa Ujung Tanjung Kec. Merebo Aceh Barat, untuk penempatan alat Satker PJN Prov. Aceh dari Tanggal 2 Feb 2013 sampai dengan tanggal 2 Agustus 2013 atau selama 2 (dua)

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 25.00 470,000.00 11,750,000.00 20-Mar-13 Panjar 1 M. Alif 1,000,000.00 43,908,000.00

2 3.60 30,000.00 108,000.00 26-Mar-13 Panjar 2 M. Alif 1,000,000.00 42,908,000.00

3 17.00 470,000.00 7,990,000.00 30-Mar-13 Panjar 3 M. Alif 1,000,000.00 41,908,000.00

4 20.00 470,000.00 9,400,000.00 3-Apr-13 Lunas M. Alif 8,858,000.00 -

16-May-13 Panjar 1 Pot 3 M. Alif 1,000,000.00 6,990,000.00

17-May-13 Lunas M. Alif 6,990,000.00 1,000,000.00

17-May-13 Panjar Pot. 4 M. Alif 1,000,000.00 8,400,000.00

25-May-13 Panjar Pot. 4 M. Alif 1,000,000.00 7,400,000.00

1-Jun-13 Panjar Pot. 4 M. Alif 1,000,000.00 6,400,000.00

5 33.00 470,000.00 15,510,000.00 27-Jul-13 Panjar 1 M. Alif 1,000,000.00 14,660,000.00

5.00 30,000.00 150,000.00 2-Aug-13 Lunas M. Alif 14,660,000.00 -

Damija 125+000 - 150+000 (Bulan 3-4)

Damija 125+000 - 150+000 (Bulan 3-4)Damija 150+000 - 156+000 & 176+00 - 187+000 (Pot.3)Damija 130+000 - 150+000 (Pot.4)

154 - 156, 176-187 & 130-150

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

44,908,000.00

Tanda Tangan

Dari Pak Al

Dari Pak Al

Dari Pak Al

Dari Pak Al

Tanda Tangan

TANDA TERIMA

No. Tanggal Uraian Jumlah Uang Nama

1 12-Apr-13 Operasional Longsoran 30,000,000.00

TANDA TERIMA

Tanda Tangan

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 14.00 470,000.00 6,580,000.00 26-Feb-13 Panjar 1 Amiruddin 5,000,000.00 36,577,500.00

2 13.00 470,000.00 6,110,000.00 7-Mar-13 Panjar 2 Amiruddin 3,000,000.00 33,577,500.00

3 17.00 470,000.00 7,990,000.00 20-Mar-13 Panjar 3 Amiruddin 2,500,000.00 31,077,500.00

Aliran Air 7.25 30,000.00 217,500.00 5-Apr-13 Panjar 4 Amiruddin 10,000,000.00 21,077,500.00

26-Apr-13 Lunas Amiruddin 397,500.00 20,680,000.00

4 14.00 470,000.00 6,580,000.00 30-Apr-13 Lunas Amiruddin 7,520,000.00 13,160,000.00

2.00 470,000.00 940,000.00 13-May-13 Amiruddin 2,500,000.00

11.00 470,000.00 5,170,000.00 24-May-13 Amiruddin 5,000,000.00

17.00 470,000.00 7,990,000.00 24-May-13 Amiruddin 5,660,000.00

Damija 30+000 - 44+000

Damija 17+000 - 30+000

Damija 44+000 - 61+000

Damija 30+000 - 44+000

Damija 17+000 - 19+000

Damija 19+000 - 30+000

Damija 44+000 - 61+000

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

41,577,500.00 41,577,500.00

Tanda Tangan

Tanda Tangan

KREDIT DEBET SISA

No. Uraian Vol (km) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 13.00 470,000.00 6,110,000.00 15-May-13 Lunas Wahyu 6,410,000.00 14,250,000.00

SaluraN Air 10.00 30,000.00 300,000.00

2 20.00 470,000.00 9,400,000.00

5.00 470,000.00 2,350,000.00

5.00 470,000.00 2,350,000.00

Saluran Air 5.00 30,000.00 150,000.00

20,660,000.00

Damija 69+000 - 82+000

Damija 82+000 - 102+000

Damija 120+000 - 125+000

Damija 125+000 - 130+000

Tanda Tangan

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 Jembatan Pribu 4,629.00 35,000.00 162,015,000.00 1-Feb-13 Panjar 1 M. Syafiei 5,000,000.00 ###

1,325.00 35,000.00 46,375,000.00 25-Feb-13 Panjar 2 M. Syafiei 5,000,000.00 ###

7-Mar-13 Panjar 3 M. Syafiei 5,000,000.00 ###

15-Mar-13 Panjar 4 M. Syafiei 5,000,000.00 ###

20-Mar-13 Panjar 5 M. Syafiei 10,000,000.00 ###

28-Mar-13 Panjar 6 M. Syafiei 10,000,000.00 ###

3-Apr-13 Panjar 7 M. Syafiei 10,000,000.00 ###

11-Apr-13 Panjar 8 M. Syafiei 10,000,000.00 ###

19-Apr-13 Panjar 9 M. Syafiei 10,000,000.00 92,015,000.00

30-Apr-13 Panjar 10 M. Syafiei 10,000,000.00 82,015,000.00

6-May-13 Panjar 11 M. Syafiei 10,000,000.00 72,015,000.00

10-May-13 Panjar 12 M. Syafiei 10,000,000.00 62,015,000.00

13-May-13 Panjar 13 M. Syafiei 10,000,000.00 52,015,000.00

16-May-13 Panjar 14 M. Syafiei 20,000,000.00 32,015,000.00

21-May-13 Lunas M. Syafiei 32,015,000.00 -

24-May-13 Panjar1 (Panga) M. Syafiei 5,000,000.00 -

30-May-13 Panjar2 (Panga) M. Syafiei 10,000,000.00

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

KREDIT DEBET SISA

No.Uraian Vol (m2) Harga Satuan Jumlah Harga Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

Tanda Tangan

Tanda Tangan

Tanda Tangan

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Indah

Jumlah Uang : #REF!

Uang Banyaknya : Tiga juta rupiah,

Untuk Pembayaran :

1. Panjar 1 Tanggal 1 Feb 2013 : Rp. 5,000,000.00 2. : Rp. 5,000,000.00 3. : Rp. 5,000,000.00

Total Rp. 15,000,000.00

Aceh Besar, 7 Maret 2013Yang menerima :

Nama : M. Syafei HarahapPekerjaan : Alamat :

Panjar ke 3 Pengecatan Jembatan (Galvanis) Ruas Jalan Km. 125 - Bts. Kota Meulaboh dengan rincian sebagai berikut :

Panjar 2 Tanggal 25 Feb 2013Panjar 3 Tanggal 7 Maret 2013

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 5,000,000.00

Uang Banyaknya : Liam juta rupiah,

Untuk Pembayaran :

1. Panjar 1 Tanggal 1 Feb 2013 : Rp. 5,000,000.00 2. : Rp. 5,000,000.00 3. : Rp. 5,000,000.00 4. : Rp. 5,000,000.00

Total Rp. 20,000,000.00

Aceh Besar, 15 Maret 2013Yang menerima :

Nama : M. Syafei HarahapPekerjaan : Alamat :

Panjar ke 3 Pengecatan Jembatan (Galvanis) Ruas Jalan Km. 125 - Bts. Kota

Panjar 2 Tanggal 25 Feb 2013Panjar 3 Tanggal 7 Maret Panjar 4 Tanggal 15 Maret 2013

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 10,000,000.00

Uang Banyaknya : Sepuluh juta rupiah,

Untuk Pembayaran :

1. Panjar 1 Tanggal 1 Feb 2013 : Rp. 5,000,000.00 2. : Rp. 5,000,000.00 3. : Rp. 5,000,000.00 4. : Rp. 5,000,000.00 5. : Rp. 10,000,000.00

Total Rp. 30,000,000.00

Aceh Besar, 20 Maret 2013Yang menerima :

Nama : M. Syafei HarahapPekerjaan : Alamat :

Panjar ke 5 Pengecatan Jembatan (Galvanis) Ruas Jalan Km. 125 - Bts. Kota Meulaboh dengan rincian sebagai berikut :

Panjar 2 Tanggal 25 Feb 2013Panjar 3 Tanggal 7 Maret Panjar 4 Tanggal 15 Maret Panjar 5 Tanggal 20 Maret 2013

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 5,000,000.00

Uang Banyaknya : Lima juta rupiah,--

Untuk Pembayaran : Panjar Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 30+000 - 44+000= 14 KM)

Banda Aceh, 26 Feb 2013Yang menerima :

Nama : AmiruddinPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 3,000,000.00

Uang Banyaknya : Tiga juta rupiah,--

Untuk Pembayaran : Panjar ke 2 Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125

Aceh Besar, 7 Maret 2013Yang menerima :

Nama : AmiruddinPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 2,500,000.00

Uang Banyaknya : Dua juta lima ratus ribu rupiah,--

Untuk Pembayaran : Panjar ke 3 Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125

Aceh Besar, 20 Maret 2013Yang menerima :

Nama : AmiruddinPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Panjar Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 30+000 - 44+000= 14 KM)

KUITANSI / BUKTI PEMBAYARAN

Panjar ke 2 Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125

KUITANSI / BUKTI PEMBAYARAN

Panjar ke 3 Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 5,000,000.00

Uang Banyaknya : Lima Juta Rupiah,--

Untuk Pembayaran :

Banda Aceh, 15 Februari 2013Yang menerima :

Nama : Pekerjaan : Alamat :

Panjar Sewa Toko di Jalan Nasional Banda - Aceh - Meulaboh (Emperum) - Banda Aceh / Samping Kantor Kehutanan

KUITANSI / BUKTI PEMBAYARAN

Panjar Sewa Toko di Jalan Nasional Banda - Aceh - Meulaboh (Emperum) - Banda Aceh / Samping Kantor

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 13,000,000.00

Uang Banyaknya : Tiga Belas Juta rupiah,--

Untuk Pembayaran : Pinjaman utk Pemberlian sepeda motor dan akan dilunasi secara bertahap dari potongan gaji

Banda Aceh, 2 Agustus 2013

Yang menerima :

Nama : M. Alif AfriantoPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 3,500,000.00

Uang Banyaknya : Tiga juta lima ratus ribu rupiah,--

Untuk Pembayaran :

1. Panjar Kerja 1 Pengelasan 23-Apr-12 2,000,000.00 2. Panjar Kerja 2 Pengelasan 1-May-12 5,000,000.00 3. Panjar Kerja 3 Pengelasan 9-May-12 5,000,000.00 4. Panjar Kerja 4 Pengelasan 14-May-12 5,000,000.00 5. Panjar Ke 5 Pengelasan 22-May-12 10,000,000.00 6. Panjar Ke 6 Pengelasan 25 - 26 Mey 2012 13,000,000.00 7. Panjar Ke 7 Pengelasan 7-Jun-12 5,000,000.00 8. Panjar Ke 8 Pengelasan 12-Jun-12 10,000,000.00 9. Panjar Ke 9 Pengelasan 6-Jul-12 1,000,000.00 10. Panjar Ke 10 Pengelasan 18-Jul-12 25,000,000.00 11. Panjar Ke 11 Patok Kilomet 7-Aug-12 3,000,000.00 12. Panjar Ke 12 Pengelasan 10-Aug-12 5,000,000.00 13. Panjar Ke 13 Pengelasan 13-Aug-12 25,000,000.00 14. Panjar Ke 14 Pengelasan 15-Aug-12 10,000,000.00 15. Panjar Ke 15 Pengelasan 25-Sep-12 2,000,000.00 16. Panjar Ke 16 Pengelasan 23-Oct-12 2,000,000.00 17. Panjar Ke 17 Pengelasan 18-Jan-13 2,500,000.00 18. Panjar Ke 18 Pengelasan 29-Jan-13 3,500,000.00

Total 134,000,000.00

Banda Aceh, 29 Januari 2013Yang menerima :

NamaPekerjaanAlamat

Pajar Kerja yang ke 18 untuk pekerjaan Pengelasan Baut Guard Rail Ruas Jalan Calang - Teunom Rincian Sbb:

KUITANSI / BUKTI PEMBAYARAN

Banda Aceh, 29 Januari 2013Yang menerima :

: Adun Din / Syarifuddin: Swasta: Lam Juhang - Lhoong

Pajar Kerja yang ke 18 untuk pekerjaan Pengelasan Baut Guard Rail Ruas Jalan Calang - Teunom

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

1 Uang dari K'Indah 1,500,000.00 14-Feb-12 Panjar 3 Damija Pot I Amiruddin 5,000,000.00 2 Uang dari M. Iqbal 10,000,000.00 14-Feb-12 Distribusi Sampah 240,000.00 3 CV. Diva Perdana 43,350,000.00 14-Feb-12 Pemasangan Patok Dian 3,500,000.00

CV. Bahagia Baru 86,803,353.00 CV. Maulana Utama 86,459,937.53 20-Feb-12 Operasional Ambil Foto Damija alif 200,000.00

22-Feb-12 Panjar 4 Damija Pot I Amiruddin 15,850,000.00 22-Feb-12 Panjar 1 Pemasangan Patok Adun Din 5,000,000.00 22-Feb-12 Pelunasan Pekerjaan JBTN M. Syafiei 17,065,000.00 9-Mar-12 up gred Laptop 900,000.00 9-Mar-12 Operasional Ambil Foto Damija Alif 200,000.00

13-Mar-12 Panjar 2 Pemasangan Patok Adun Din 1,500,000.00 13-Mar-12 Operasional Ambil Foto Damija Alif 200,000.00 15-Mar-12 Beli Besi Koko 31,500,000.00 16-Mar-12 Perbaikan Listrik M.Nur 1,250,000.00 19-Mar-12 Calang 800,000.00

Beli Kayu Patok 500,000.00 20-Mar-12 Operasional M. Igbal 800,000.00 20-Mar-12 Panjar 3 Pemasangan Patok Adun Din 1,000,000.00 22-Mar-12 Ambil Innova Alindra 600,000.00 22-Mar-12 Service AC 50,000.00 26-Mar-12 STNK Duble Cubin 10,500,000.00 26-Mar-12 Damija Ruas 28 Dedi 10,400,000.00 26-Mar-12 Induk P' Firman 50,000,000.00 26-Mar-12 Koko 40,000,000.00 26-Mar-12 Panjar Kerja Staf 15 org 22,500,000.00 26-Mar-12 Insentif jan-feb 2012 Chalid 6,000,000.00 26-Mar-12 Kemedan Chalid 3,000,000.00

Sub. Total 228,113,290.53 228,555,000.00 (441,709.47)3-Apr-12 CV. Chantika 86,660,000.00 26-Mar-12 Perbaikan Plat Bed Alindra 2,700,000.00

13-Apr-12 CV. Dunia Technologi 85,750,000.00 3-Apr-12 Pelunasan Pemasangan Patok Adun Din 8,580,000.00 2-Apr-12 Upaha Operator (Buang Longsor) Junaidi 250,000.00 3-Apr-12 Operasional Buras+Damija+saluran Alif & Iqbal 3,350,000.00 4-Apr-12 Insentif (LS) Firman/Marzuki 5,000,000.00 4-Apr-12 Instal Komputer Firman 100,000.00 4-Apr-12 Perbaikan Sepeda Motor Firman 200,000.00 4-Apr-12 Tranfer Koko 15,000,000.00 4-Apr-12 Induk Firman SH 40,000,000.00

minus yang lalu 441,000.00 7-Apr-12 Beli Redymix M. Iqbal 3,110,000.00 7-Apr-12 Beli Kamera 8 Unit @ 1.150.000 Chalid 9,200,000.00 8-Apr-12 Tranfer Mawardi 15,000,000.00 8-Apr-12 Insentif Maret 2012 Chalid 3,000,000.00

10-Apr-12 Perbaikan Sepeda Motor Marzuki 987,500.00 10-Apr-12 Operasional Damija+saluran M. Iqbal 1,200,000.00

11-Apr-12 Kemedan Chalid 1,500,000.00 11-Apr-12 Beban Induk Dian 14,400,000.00 12-Apr-12 Operasional M. Iqbal 5,000,000.00 16-Apr-12 Transfer Koko 15,000,000.00 16-Apr-12 Transfer Mawardi 10,000,000.00 16-Apr-12 Damija Dedi 5,200,000.00

Sub. Total 172,410,000.00 159,218,500.00 13,191,500.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

13,191,500.00 17-Apr-12 Ban Panter 500,000.00 20-Apr-12 Cv. Demi Rakyat 44,150,000.00 17-Apr-12 Meter 4 Sigmat 4 380,000.00

17-Apr-12 Kecalang 850,000.00 17-Apr-12 Insentif Wahyu 50,000.00

4-May-12 CV. Tuah jaya LEstarindo 86,000,000.00 19-Apr-12 Operasional Ambil Foto Alif 300,000.00 Beton dan Baja 20-Apr-12 Panjar Kerja Edi 500,000.00

20-Apr-12 Kebutuhan Hari2 Edi 500,000.00 9-May-12 CV. Bukit Siguntang 86,300,000.00 20-Apr-12 Panjar Kerja Hendri 500,000.00

Pre Cast 20-Apr-12 Panjar Kerja Supriadi 500,000.00 20-Apr-12 Mobilisasi Besi Alif 150,000.00

CV. Tuah Cot Sebati 86,300,000.00 23-Apr-12 Panjar Kerja 1 pot II M. Amir 3,000,000.00

Pre Cast 23-Apr-12 Alif 650,000.00

12-Jun-12 CV. Ulan Persada (Las) 46,350,000.00 23-Apr-12 Panjar Kerja 1 Pengelasan Adun Din 2,000,000.00 25-Apr-12 Perbaikan Listrik M. Nur 1,400,000.00

CV. Anugrah Jaya (Damija) 86,700,000.00 26-Apr-12 Operasional Cor Plat SMP Alif 1,000,000.00 27-Apr-12 Induk Firman, SH 50,000,000.00

CV. Kemuning (Damija) 86,800,000.00 30-Apr-12 Operasional dan Bayar Beton M. iqbal 15,000,000.00

CV. Meudang Jaya (Las) 10,200,000.00 1-May-12 Panjar Kerja 2 Pengelasan Adun Din 5,000,000.00 (sisa dari kak Indah) 1-May-12 Dedi 100,000.00 CV. Bening Utama (Rambu) 86,689,000.00 88,912,369.00 2-May-12 Urus Sertifikat ke Balai Chalid 1,500,000.00

4-May-12 Beli Molen Koko 10,000,000.00 4-May-12 Besi + Gaji Harian+ Operasional M. Iqbal 25,000,000.00 6-May-12 Operasional M. Iqbal 5,000,000.00 7-May-12 Calang

Makan Siang + Aqua 250,000.00 P" Yuswar Pemdakab 300,000.00 Makan Malam 65,000.00 BBM 220,000.00 Insentif Dian 100,000.00

9-May-12 Panjar Kerja 2 Pot 2 M. Amir 1,500,000.00 9-May-12 Insentif April 2012 Chalid 3,000,000.00 9-May-12 Panjar Kerja 3 Pengelasan Adun Din 5,000,000.00

10-May-12 Operasional Alif 670,000.00 11-May-12 KE medan Chalid 2,200,000.00 11-May-12 Operasional Alindra 4,000,000.00 14-May-12 Operasional Alif 1,100,000.00 14-May-12 Panjar Kerja 4 Pengelasan Adun Din 5,000,000.00 14-May-12 Operasional M. iqbal 5,000,000.00 14-May-12 Insentif (LS) Firman 2,500,000.00 15-May-12 Operasional Alif 700,000.00 15-May-12 Calang

Makan Mlm + Aqua + Snak 120,000.00 BBM 270,000.00 Uang Makan Pengawas Edy 1,000,000.00

16-May-12 Tranfer P' Emi 50,000,000.00 16-May-12 Panjar Pengelasan R. 27 Via M. Iqbal 2,000,000.00 16-May-12 Pelunasan Damija Pot 2 (36,5 KM) M. Amir 13,125,000.00 16-May-12 Bantu Acara Pesta Afrizal 3,000,000.00 18-May-12 Panjar Kerja Dian 500,000.00 18-May-12 Operasional Backhoe Loader Alindra 3,500,000.00 21-May-12 Untuk Bu Mela Via B'Indah 500,000.00 21-May-12 Operasional Pree Cast M. iqbal 10,000,000.00 Revisi

2012

untuk 6 hari dan beli ban dalam kereta sorong

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

22-May-12 Panjar Ke 5 Pengelasan Adundin 10,000,000.00

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

23-May-12 Operasional Buang Longsoran Alindra 6,000,000.00 23-May-12 Insentif (LS) Marzuki 2,500,000.00 25-May-12 Panjar Ke 6 Pengelasan Adundin 13,000,000.00 24-May-12 Operasional Buang Longsoran Alindra 4,000,000.00 30-May-12 Calang (Irjen)

Makan Digerute dengan Irjen 130,000.00 100,000.00

Solar 250,000.00 Makan Malam di Digerute 72,000.00

31-May-12 Operasional Buang Longsor Alindra 4,000,000.00 31-May-12 Beli Semen dan Besi M. Iqbal 20,000,000.00 Revisi 31-May-12 Panjar Pengecatan Irmansyah 1,000,000.00 31-May-12 Biaya Tiket Pekerja dari Bandung M. Iqbal 2,600,000.00 4-Jun-12 Beli Printer L200 Chalid 1,525,000.00

Beli Laptop Chalid 8,950,000.00 4-Jun-12 Operasional dan Gaji Harian Alif 9,900,000.00 6-Jun-12 Panjar ke 4 Pot II M. Amir 3,000,000.00 7-Jun-12 Beli Besi dan Operasional M. Iqbal 15,000,000.00 7-Jun-12 Panjar Ke 7 Pengelasan Adundin 5,000,000.00 9-May-12 Insentif Mey 2012 Chalid 3,000,000.00

11-Jun-12 Ke Calang Chalid 300,000.00 11-Jun-12 Uang Makan Harian Edi 500,000.00

Triplek mika di Base Camp 150,000.00 12-Jun-12 Panjar Ke 8 Pengelasan Adundin 10,000,000.00 12-Jun-12 Operasional M. Iqbal 16,700,000.00 12-Jun-12 Panjar Pembelian Rambu Akmizal 80,000,000.00 12-Jun-12 Tanfer Koko 40,000,000.00 12-Jun-12 Vie Kwitansi BBM di SPBU 100,000.00 13-Jun-12 Induk Firman, SH 100,000,000.00 13-Jun-12 Ls. Pengawas (5 pengawas + 1 TU) 25,000,000.00

13-Jun-12 2,750,000.00 13-Jun-12 Operasiaonal Longsoran Muzakir 5,000,000.00 14-Jun-12 Panjar Pot. Damija 28 Via Dedy 2,000,000.00

14-Jun-12 M. Iqbal 10,000,000.00 14-Jun-12 Ganti Oli Ford B 9916 TO 316,000.00 15-Jun-12 Panjar ke 5 M. Amir 3,500,000.00 Kwitansi Manual 18-Jun-12 Ganti Ban Plat Bet + Pelk M. Alindra 6,000,000.00 18-Jun-12 Panjar Pembuatan Pre Cast Wahyu 1,000,000.00 19-Jun-12 Operasional M. Iqbal 10,000,000.00 19-Jun-12 Operasiaonal Longsoran 28 Alif 2,000,000.00

20-Jun-12 Alindra 1,200,000.00 22-Jun-12 Ganti Ban Innova BK 545 SQ Alindra 1,850,000.00 22-Jun-12 Bahan buat gudang M. Iqbal 4,610,000.00 25-Jun-12 Ke Calang Chalid 950,000.00 26-Jun-12 Operasional M.IQBAL 5,000,000.00 26-Jun-12 Kemedan Chalid 3,000,000.00 28-Jun-12 Panjar Damija Ruas 28 Via Dedy 4,000,000.00 28-Jun-12 Bulanan Dedy 1,000,000.00 29-Jun-12 Operasional M.IQBAL 3,000,000.00 4-Jul-12 Operasional M.IQBAL 1,000,000.00 Revisi 4-Jul-12 Ban Panter 900,000.00

Buah@ dan Aqua

(Sporing+AC+Reben+Oli + Wifer+Klakson)

Operasional + Panjar Cat + Knopi Rmh P'Al

Bumbu kirim ke bandung + bahan buat gudang

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

Sub. Total 632,680,500.00 691,353,000.00 ###

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

6-Jul-12 Dari K' Indah (untuk adundin) 1,000,000.00 Minus s.d 6 Juni 2012 58,672,500.00 7-Jul-12 Dari K' Indah (operasional) 2,000,000.00 30-Dec-99 Panjar Ke 9 Pengelasan Adundin 1,000,000.00 9-Jul-12 4,000,000.00 9-Jul-12 Kunjungan Kepegawaian Balai

10-Jul-12 CV. Dunia 85,400,000.00 B' Mela 1,000,000.00 (Upah damija 027) BBM 250,000.00

10-Jul-12 CV. Unkee rimeng 84,470,000.00 Snak dan Aqua 65,000.00 (Pas. Batu dan Bahu 027) Makan di Geurute 100,000.00

10-Jul-12 CV. Mizulty 85,800,000.00 Makan di Teunom 170,000.00 (Buras 027) 10-Jul-12 Pelunasan Pot, Damija II Amiruddin 15,600,000.00

11-Jul-12 CV. Aceh Brother 53,690,000.00 10-Jul-12 Panjar 1 Pas. Batu Amiruddin 12,000,000.00 (Pengelasan Baut 027) 10-Jul-12 Insentif bulan 6 Chalid 3,000,000.00

11-Jul-12 CV. Demi Rakyat 36,140,000.00 10-Jul-12 M. Igbal 26,400,000.00

(Pengelasan Baut 028) 10-Jul-12 Ls. Dian dan Supri 5,000,000.00 11-Jul-12 CV. Dafa 86,900,000.00 11-Jul-12 Ls. Hendri dan Edi 5,000,000.00

(Rambu 028) 11-Jul-12 Ls. Firman & Marzuki 5,000,000.00 10-Jul-12 CV. One Plus One 11-Jul-12 Panjar Ke 2 Rambu Akmizal 50,000,000.00

(Rambu 027) 12-Jul-12 Induk Firman SH 50,000,000.00 86,494,000.00 86,494,000.00 12-Jul-12 Opersional (urain dikwitansi) M. Igbal 45,000,000.00

18-Jul-12 CV. Talenta (Beton) 87,100,000.00 12-Jul-12 Dian 500,000.00

18-Jul-12 CV. Tuah Jaya (Beton) 87,000,000.00 12-Jul-12 #REF! M. Alif 1,500,000.00 13-Aug-12 CV. Maulana Utama (Damija 27)

73,081,000.00 14-Jul-12 Irman 200,000.00 14-Jul-12 KeCalang 700,000.00

15-Aug-12 69,750,000.00 17-Jul-12 Keperluan SD selasa 17 Juli 2012 M. Iqbal 43,237,000.00 17-Jul-12 Oprasional Galian Batu Dedy 7,120,000.00

16-Aug-12 95,270,000.00 17-Jul-12 Beli Solar M.Iqbal 2,100,000.00 17-Jul-12 Meugang Staf 18,300,000.00

7-Sep-12 CV. Meutuah 88,680,000.00 18-Jul-12 Panjar Kerja Pre Cast Wahyu 1,500,000.00 18-Jul-12 Panjar Gaji Pekerja Harian Alif 5,000,000.00

7-Sep-12 CV. Cantika 95,470,000.00 18-Jul-12 Alif 6,850,000.00 18-Jul-12 Sisa Kunjungan Rombongan Balai Chalid 1,433,000.00

7-Sep-12 CV. Dunia Teknologi 86,650,000.00 18-Jul-12 Panjar 10 Pengelasan Adundin 25,000,000.00 19-Jul-12 Panjar 2 Pas. Batu Amiruddin 5,000,000.00

20-Sep-12 CV. Talenta (Aspaltic 29) 84,550,000.00 19-Jul-12 Perbaikan Ford 9916 Alindra 1,200,000.00 stiker 9916 via chalid 300,000.00

27-Sep-12 CV. Maulana 66,698,000.00 Sopring 9916 via chalid 270,000.00 Velg 9916 via chalid 2,000,000.00

27-Sep-12 CV. Tuah Jaya 74,535,000.00 20-Jul-12 Perbaikan Ford 9916 (kaki2) via chalid 2,000,000.00 24-Jul-12 Operasional M. Iqbal 10,000,000.00

1-Oct-12 CV. Tuah Cot (Galvanis) 80,850,000.00 26-Jul-12 Operasional (Beli Aspal) M. Iqbal 6,000,000.00 26-Jul-12 Operasional M. Iqbal 25,000,000.00

1-Oct-12 CV. Muzulty (Galvanis) 86,900,000.00 26-Jul-12 Panjar 3 Pas. Batu Amiruddin 5,000,000.00 Via Iqbal

Balai)

Opersional, Pengecoran Bahu Sta. 69 dan Upah pekerja Damija 3 org x @ 1.300.0000 Operasional

Beli Cangkir dan Gali Sumur di Base Camp

Mobilisasi Rambu( dari akmizal ke Rmh Alindra)

CV. Dunia Teknologi (Patching)CV. Bukit Sugintang (Las Baut

Operasional

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

27-Jul-12 MedanP"Timbul 1,000,000.00 P' Fatur 2,000,000.00 B' Mela 500,000.00 Staf B' Mela 2 Org 400,000.00 CUT 300,000.00 Yusra 500,000.00 Rina 500,000.00 Koko P'Risman 200,000.00 Hotel 1,000,000.00 Erpotex Banda Aceh 100,000.00 Erpotex Medan 150,000.00 Lain 150,000.00

31-Jul-12 MedanErpotex Banda Aceh 100,000.00

P'Al 3,000,000.00 4-Aug-12 Perbaikan Ford 9067

_reben + klakson + antena chalid 900,000.00

4-Aug-12 chalid 1,070,000.00 4-Aug-12 Ke Calang chalid 250,000.00

5-Aug-12 AC Ford 9916 chalid 3,200,000.00 5-Aug-12 Oprasional M. Iqbal 10,000,000.00 6-Aug-12 Oprasional M. Iqbal 10,000,000.00 6-Aug-12 Oprasional Dedy 2,000,000.00 6-Aug-12 Panjar 1 Damija Alif 2,000,000.00 6-Aug-12 Insentif bulan 7 Chalid 3,000,000.00 7-Aug-12 Panjar 11 Adun Din 3,000,000.00 7-Aug-12 Oprasional M. Iqbal 21,000,000.00 7-Aug-12 Panjar Pas. Batu Amiruddin 10,000,000.00 7-Aug-12 Panjar Pek. Damija Amiruddin 1,500,000.00 7-Aug-12 Pelunasan Pengadaan Rambu Akmizal #REF!9-Aug-12 Kebutuhan dilapangan Pengawas Dian 500,000.00

10-Aug-12 Mawardi 10,000,000.00 10-Aug-12 Panjar 12 Adun Din 5,000,000.00 10-Aug-12 Pinjaman Alif 1,500,000.00 10-Aug-12 Meugang Staf Induk Via Muzakir ppk 11 1,950,000.00 13-Aug-12 Operasional M. Iqbal 10,000,000.00 13-Aug-12 Panjar Pas. Batu Amiruddin 3,000,000.00 13-Aug-12 Panjar 13 Adun Din 25,000,000.00 13-Aug-12 Ls Pengawas 6 Org 15,000,000.00 14-Aug-12 Panjar Ke 5 Pas. Batu Amiruddin 7,000,000.00 14-Aug-12 Pelunasan Damija 24 KM Amiruddin 9,780,000.00 14-Aug-12 Operasional M. Iqbal 50,000,000.00 15-Aug-12 Panjar Ke 14 Pengelasan Adun Din 10,000,000.00 15-Aug-12 3,000,000.00 15-Aug-12 Tambahan Meugang chalid 5,000,000.00 15-Aug-12 Beli Aspal (Tranfer) Koko 40,000,000.00 16-Aug-12 Upah Damija 028 Dedy 4,000,000.00 transfer 16-Aug-12 Operasional M. Iqbal 15,000,000.00 Blm ada Kw 16-Aug-12 Panjar 4 damija Alif 7,660,000.00 16-Aug-12 Induk Firman, SH 55,500,000.00 16-Aug-12 Perbaikan Kereta Afrizal 500,000.00 24-Aug-12 Operasional M. Iqbal 26,000,000.00 Blm ada Kw

Sporing Ford 9067 + perbaika P. Stering

Tambahan Meugang (Subhan,Deni, Nova, Alindra, Muti, Chairul dan Andre)

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

28-Aug-12 Operasional M. Iqbal 15,000,000.00 Blm ada Kw 1-Sep-12 Operasional M. Iqbal 3,000,000.00 Blm ada Kw 3-Sep-12 Operasional M. Iqbal 400,000.00 Blm ada Kw 5-Sep-12 Insentif bulan 8 chalid 3,000,000.00 7-Sep-12 Operasional M. Iqbal 40,000,000.00 Blm ada Kw

10-Sep-12 Induk Firman, SH 50,000,000.00 10-Sep-12 Panjar Damija Amiruddin 2,000,000.00 10-Sep-12 P'Al 116,650,000.00 11-Sep-12 Panjar Ke 6 Pas. Batu Amiruddin 20,000,000.00 12-Sep-12 Pinjaman M.Alindra 500,000.00 12-Sep-12 Panjar 1. Pengecatan Galvanis M. Syafei 5,000,000.00 14-Sep-12 Joko Staf Bu Endang 1,000,000.00 17-Sep-12 Satpam Induk 50,000.00 17-Sep-12 Lembur 50,000.00 19-Sep-12 Pelunasan Upah Damija 17 KM Amiruddin 5,990,000.00 21-Sep-12 Pelunasan Upah Damija 13 KM M. Alif 6,110,000.00 24-Sep-12 Ke Calang chalid 700,000.00 25-Sep-12 Panjar 2. Pengecatan Galvanis M. Syafei 5,000,000.00 25-Sep-12 Panjar 15. Pengelasan Adun Din 2,000,000.00 26-Sep-12 Pelunasan Upah Damija Sta, 125+000 M. Alif 1,000,000.00 27-Sep-12 Hanafiah 2,500,000.00

27-Sep-12 Subhan 400,000.00

27-Sep-12 Amiruddin 5,170,000.00

28-Sep-12 Panjar 3. Pengecatan Galvanis M. Syafei 5,000,000.00 24-Sep-12 Ke Medan chalid 2,700,000.00 2-Oct-12 Insentif Bulan 9 chalid 3,000,000.00 2-Oct-12 Panjar 4. Pengecatan Galvanis M. Syafei 10,000,000.00 3-Oct-12 Monitoring Jbtn dgn KPKN Alindra 2,000,000.00

Sub. Total ### #REF! #REF!

Operasional Supir Pak Lukman Ke tapaktuanKebutuhan Hari2 Rmh Pak Al dari tgl. 13 SeptemberPelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Sepanjang 11 KM

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

5-Oct-12 Sisa Bulan Lalu 363,813,500.00 5-Oct-12 Induk Firman, SH (Via Dia 100,000,000.00 5-Oct-12 CV. Bukit Siguntang 43,949,000.00 5-Oct-12 Aspal Tick (Tranfer Mandiri) Anto 70,000,000.00

10-Oct-12 CV. Talenta (Damija 27) 85,000,000.00 7-Oct-12 Ke Calang Chalid 750,000.00

10-Oct-12 82,650,000.00 7-Oct-12 Uang Makan Pengawas Dian dan Firman 500,000.00 10-Oct-12 CV. Meutuah (Baja 28) 64,050,000.00 8-Oct-12 Panjar 5. Pengecatan Galvanis M. Syafei 10,000,000.00 15-Oct-12 CV. Cantika (Upah cAt 28) 46,520,000.00 8-Oct-12 OP M. IQBAL 50,000,000.00 Blm ada kwitansi

8-Oct-12 Panjar 8. Pas. Batu AMIRUDDIN 50,000,000.00 8-Oct-12 AMIRUDDIN 3,290,000.00

9-Oct-12 Wahyu Hidayat 4,810,000.00

9-Oct-12 Sudirman (Khaidir) 8,000,000.00

10-Oct-12 M. Alif 6,990,000.00

10-Oct-12 Insentif M. IQBAL 1,000,000.00 10-Oct-12 Insentif Chalid 10,000,000.00 10-Oct-12 Insentif Afrizal 500,000.00 10-Oct-12 Insentif Alif 500,000.00 10-Oct-12 Insentif Nova 500,000.00 10-Oct-12 Insentif Deni 500,000.00 10-Oct-12 Aspal Tick (Tranfer Mandiri) Anto 40,000,000.00 10-Oct-12 Op (Tranfer ) Mawardi 25,000,000.00 10-Oct-12 Ls Pengawas 15,000,000.00 11-Oct-12 Panjar 6. Pengecatan Galvanis M. Syafei 10,000,000.00 11-Oct-12 Buku Perpres 70 Induk Via Titut 500,000.00 12-Oct-12 Op Patching M. IQBAL 10,000,000.00 14-Oct-12 Op Patching + Pas. Rambu M. IQBAL 5,000,000.00 15-Oct-12 Pak Al 2,500,000.00 16-Oct-12 Medan Cut 500,000.00 16-Oct-12 Mela 500,000.00 16-Oct-12 Yusra 500,000.00 16-Oct-12 Timbul 1,000,000.00 16-Oct-12 Risman 1,000,000.00 16-Oct-12 Luwis 1,000,000.00 16-Oct-12 Koko Supir Balai 200,000.00 16-Oct-12 Anggota Mela 200,000.00 16-Oct-12 Yanti P Timbul 200,000.00 16-Oct-12 Akomudasi+Penginapan+Tiket Mes-btj Chalid 1,750,000.00 16-Oct-12 Perbaiakan Honda Marzuki 520,000.00

CV. Ungke Rimang (Pas. Batu dan Beton 28)

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Sepanjang 7 KMPelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Sepanjang 11 KMPanjar Ke 3 Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Sepanjang 38 KMLunas Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Sepanjang 17 KM

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

Sub. Total 685,982,500.00 432,710,000.00 ###

16/5/2012 Sisa Bulan Lalu 253,272,500.00 18-Oct-12 Panjar 7. Pengecatan Galvanis M. Syafei 5,000,000.00 18-Oct-12 Bayar Tiket Chalid + Alindra Adimulya Trafel 2,000,000.00 18-Oct-12 Bayar Tiket (batam) Dian Induk 5,000,000.00 18-Oct-12 P'AL 70,000,000.00 18-Oct-12 Meugang Staff Indah 14,600,000.00 19-Oct-12 Besi + Panjar pas. Batu Mawardi 30,000,000.00 19-Oct-12 Op M.Iqbal 30,000,000.00 19-Oct-12 Pelunasan TPT Amiruddin 19,910,000.00 19-Oct-12 Panjar 8. Pengecatan Galvanis M. Syafei 15,000,000.00 19-Oct-12 Batam 50,000,000.00 21-Oct-12 Kamar + akomudasi 6,300,000.00

21-Oct-12 6,400,000.00

Sub. Total 253,272,500.00 254,210,000.00 (937,500.00)

(P'Parlin, P'Timbul,P'Amri,P'Dinar,P'Hengki dan P'Luwis +Anggota b Endang+Jufri+Kamal

KREDIT DEBET SISA

No. Tanggal Uraian Jumlah Uang Tanggal Uraian Penerima Jumlah Uang Jumlah Sisa

Minus s.d 21 Oct 2012 937,500.00 12-Nov-12 CV. Dunia Teknologi 62,000,000.00 12-Nov-12 Operasional M. Iqbal 10,000,000.00 22-Nov-12 CV. Tuah Cot 77,500,000.00 13-Nov-12 Clang Chalid 430,000.00 6-Dec-12 CV. Tuah Jaya Lestarindo 50,700,000.00 13-Nov-12 Insentif Bulan 10 Chalid 3,000,000.00

10-Dec-12 CV. Cantika 36,434,000.00 15-Nov-12 Panjar 10. Pengecatan Galvanis M. Syafei 5,000,000.00 18-Nov-12 Operasional Mawardi 15,000,000.00 18-Nov-12 LS Pengawas 6 Org 15,000,000.00 20-Nov-12 Besuk Deni Sakit 500,000.00 23-Nov-12 Beli Printer 600,000.00 23-Nov-12 Panjar 11. Pengecatan Galvanis M. Syafei 10,000,000.00 28-Nov-12 Induk Firman 50,000,000.00 28-Nov-12 OP.Lemb ur M. Iqbal 500,000.00

30-Nov-12 Amiruddin 2,000,000.00 30-Nov-12 Panjar 12. Pengecatan Galvanis M. Syafei 5,000,000.00 Transfer

30-Nov-12M. Alif 1,500,000.00

30-Nov-12 Panjar pas. Batu Mawardi 10,000,000.00 5-Dec-12 Panjar 13. Pengecatan Galvanis M. Syafei 5,000,000.00 Transfer 6-Dec-12 Operasional (Honor + Time Sheet) M. Iqbal 22,214,000.00

7-Dec-12 Amiruddin 7,870,000.00

7-Dec-12 Wahyu 1,000,000.00 13-Dec-12 LS Pengawas 15,000,000.00 13-Dec-12 Insentif Bulan 11 Chalid 3,000,000.00

13-Dec-12M. Alif 1,320,000.00

14-Dec-12 Panjar 14. Pengecatan Galvanis M. Syafei 10,000,000.00 14-Dec-12 Makan Malam dengan Yusra Balai M. Iqbal 500,000.00 19-Dec-12 Perbaikan Honda M. Iqbal 3,600,000.00

21-Dec-12Amiruddin 6,580,000.00

21-Dec-12 Besuk Fitri Sakit 500,000.00 21-Dec-12 Panjar 15. Pengecatan Galvanis M. Syafei 10,000,000.00

21-Dec-12 Wahyu 8,400,000.00

2-Jan-13 Wahyu4-Jan-13 Panjar 16. Pengecatan Galvanis M. Syafei Transfer 4-Jan-13 Insentif Bulan Des Chalid 3,000,000.00 Transfer

Sub. Total 226,634,000.00 227,451,500.00 (817,500.00)

Panjar Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 17+000-20+000 & 34+000 - 37+000 = 6 km

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 Panjar Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 17+000-20+000 & 34+000 - 37+000 = 6 km

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 20+000 & 34+000 = 14 km

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 70+000 & 90+000 = 20 km

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 67+800 & 69+800 = 2 km

KET.

26 Maret 2011

16 April 2011

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

Kwitansi Manual

KET.

Tanggal Laporan Ke P'alfakih

6 Juni 2012

KET.

Tanggal Laporan Ke P'alfakih

Revisi

KET.

Tanggal Laporan Ke P'alfakih

KET.

Tanggal Laporan Ke P'alfakih

5-Oct-12

KET.

Tanggal Laporan Ke P'alfakih

Revisi

Blm ada kwitansi

Potong Pinjaman Rp. 1.300,0000

KET.

Tanggal Laporan Ke P'alfakih

18-Oct-12

Revisi

KET.

Tanggal Laporan Ke P'alfakih

KUITANSI / BUKTI PEMBAYARAN

Sudah Terima Dari : Abd. Chalid

Jumlah Uang : Rp. 940,000.00

Uang Banyaknya : Sembilan ratus empat puluh rupiah,

Untuk Pembayaran : Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 67+800 & 69+800 = 2 km

Banda Aceh, 2 Januari 2013Yang menerima :

Nama : WahyuPekerjaan : Alamat :

KUITANSI / BUKTI PEMBAYARAN

Pelunasan Upah Damija Ruas jalan Bts. Aceh Besar - KM. 125 (KM. 67+800 & 69+800 = 2 km

PHO SEKSI I DAN TPT 20,000,000.00 Ketua / P' Risman #REF!Sekretaris 1,500,000.00 P' Imsal Medan 1,500,000.00 P' Tarmizi 1,000,000.00 P' Jufri 1,000,000.00 P' Firman 1,000,000.00 P' Zaini 1,500,000.00 Chanti 1,000,000.00 Dedy 1,000,000.00 2 Bh Dokumen 3,000,000.00 Total #REF!Sisa setelah u/tim pho #REF!