ffi - Ministry of Road Transport and Highways
-
Upload
khangminh22 -
Category
Documents
-
view
3 -
download
0
Transcript of ffi - Ministry of Road Transport and Highways
ffiGOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT & HIGHWAYSTELEFAX z 0l 4l-28117 7 6, 28 1 1 83E-mail: ro.j aipur.m [email protected]
No. RI/DP P I AP t2ot 4-t sna6flL L >I' ooorru MEM,RANDUM
O/o Regional Officer,DCM, AJMER ROAD,JAIPUR - 302 019
Dated: 1811112016
Subject:- Consultancy services for Authority's Engineer for supervision of civil construction worksfor:- (i) Construction of Northen Kota Bypass of two lane with paved shoulder configuartion strtingfrom Desig Ch.0.0 (km 391i100 of NH-76) to Design Ch. 10+300 (Rangpur Road) Package I inState of Rajasthan on EPC Mode & (ii) Construction of Northen Kota Bypass of two lane withpaved shoulder configuartion strting from Desig Ch. 10.300 (Rangpur Road) to Design Ch. 14+200(km ll/700 of SH-33) Package II in State of Rajasthan on EPC Mode- Replacement ofBridge/Structural Engineer -reg.
It is to inform that M/s Highway Engineering Consultant in Association Pioneer InfraConsultants Pvt. Ltd, which the Authority's Engineer for said works, has submitted the CV of Mr.Sujeet Kumar, Bridge/Structural Engineer (Copy enclosed) in place of earlier deployBridge/Structural Engineer.
In this regard, it is requested to furnish the comments, if any; on or before 3011112016 to this
office (E-mail: [email protected]/[email protected]) on CV of Mr. Sujeet
Kumar, BridgeiStructural Engineer as proposed by the M/s Highway Engineering Consultant inAssociation Pioneer Infra Consultants Pr,t. Ltd for said works.
Enclosure: As abovet '" ,l /"lt
ryr vv(B S Joiya)
Executive Engineer,For Regional Officer
To.
cE (P-r) / cE (P-2) t CE (P-3y CE (P-4) | CE (P-s) t CE (P-6) / CE (P-7) |(NERyCE(S,R&T(Bridge))/CE(S,R&T(Roads))/CE(EAPyCE(LWEyCE(NHDP-IV) &ROs/ELOs of the MoRTH
CEAI
TrR fr@-rtl;qTg, CgrURBAN IMPROVEMENT TRUST, KOTA
m-qtq: F9/E.8.(Py20l5-16/ '?-I I J
ToRegional OfficerMinistry of Road Tarnsport and Highway
D.C.M Ajmer Road
Jaipur
Sir,With reference to above subject it is stated that
Engineer Submited by HEC in Associtation with PCPL
submitted for Approval or Necessary actlon.
Sub..Consu|tancyServlceforAuthority,sEngineerforSupervisionofcivt|constructionworKsfor construction of Northern Kota bypass from Design ch 0 000(km 391/100 of NH-76)
to Design ch 10+300 (Rangpur Road) Package-l and from Design ch' 10/300
(Rangpur road) to Design ch. 14.200 (km',11/700 of SH-33) with link road ol 452m
tength with sH-33 {Package-lt} in the state of Rajasthan on EPC mode under NH (0)'
Reg. Replacement of Bridge/Structural Engineer'
Ref: - Letter No HEC in Asso. With PCPL/2015-161162-A dated 12 08 16
Date: *il sl lt
CV for Replacement of BridgeiStructural
is Checked and found rn Order' Same is
WProject Director
Cum Executive Engineer
UlT, Kota (Raj.)
Date:
Thanks.
ffiqltr F9/E.E.(P)/20I 5-l6/
Copy to:-
l. ChiefEngineer UDDHQ IJIT.Kota
2. Additional Chief Engineer UIT. Kota
3. Superintending Engineer ll 'UIT. Kota
4. Autority Engineer IIEC Association PCPL Jaipur'
IIII
Proje{t Director
Cum Exec$tive Engineer
ulr, tota
(Rai)
D:\General Letter NB.docx
iiion of civil construction works
for Construction of Northern Kota Bypass from Design ch.0.00 (km391/100 of NH-76) to Design
Ch. 10,300 (Rangpur road) {Package-l} and from Design Ch. 10/300 (Rangpur road) to Design Ch'
14.200(km11/700 of sH-33) with link road of 452m length with sH-33 {Package-ll} in the state of
Rajasthan on EPC mode under NH (0)
SRIDGE ENGI'ITER ,., v Soleefl4q?tti{
5r no. Descripti onMax.
Points
Name of thr Bidder
Name of the team Leader proposed by the
Bidder
Criteria
tetails of self evaluation
with Page reference ofeach certificate fromTechnical Proposal
Maks given in
Evaluation
I General Qualification 25
l) Graduate rn Crvii Englneeriitg from recognlze(t unrverslly 21 8. E.Civil 2t
l) Post Graduate Degree in Structural Engineerang o
2 Adequacv for the Proiect 70
ri Professional Experience< 15 years -0
lsyears -1iAod 1 mark exira for each additionai 1 years of experrence sublecl
lo Inaxrmum 4 marks
15 > 1-9 yrs 15
ii)Experience in Construction / ConstructionSupervision of bridge / interchange / any other
< '10 years -0
10 years -16
Add 2 mark extra for each additionalcomplited year of experience
subiect lo maxrmum 4 marks
20 > 12yrs 20
| ,,,yI
Experience in similar capacity in supervision ofMajor Highway Bridges on PileMell foundation
<2brdgss - 0
2 bncjges - .16
Add 2 marK for each addrtronal project subject to maxlmum 4
marks
20 >4 No 20
1v)Experience in supervision of Rehabilitation andreoair of Maior Bridoes.
l.2bridges - o
12 bridges - 8
13 or more - 10
>3No 10
v)
Familarity with rnodern methods of constructionof bridges/ROB/flyover involving RCC/pre-stressconcrete, design standards, technicalspecifications and statistical QualityControl/Assurance procedures for construction ofdifferent component of bridges.
Experience in 1 project
More lhan 1 Project 5 >1No 5
3 Permanent emplovment with the Firm 5at
Not employed with the Firm - 0 marks< 1 yeat -0
1 Yea( o( more tnan 1 year "5
o
Tota 100 91
Note'1) For experience, certificates from employer shall be submitted with cV
2) Ploof of Perrtdtrarrertt errt:loytrrcrr[ :lrall olso be 5ublrlilled
q)*i#iffi*.'
-- i,g-107,1$8 ftheme, Oppssite Narayan Niwas,
Gopalpura Bypass, Jaipur-302017(R4] - -.Tel: : +91-141- 2761891'92 / Fax No' 276 18 91
Email : [email protected]
[$n{;gg1.1,4Y fiN{;{ftfiF:{tEftG {.'{jf{SBj{jA'qft'g' trffi:
tt* A$S#g,AIt#flt WiT}", "::..1t... 1t:.}{.c"":e'. .,,
Pt{}ru$iF:ffi 9*dr"*r f,l*nsa.:Xf*snts }1v*. Lrl$.
No. HEC in Asso. with PCPL/ zots-Lilt..I.{*.:..14Dt.: 12.08.2016
To,
The Executlve Engineer (P),
Urban lmprovement Trust,Rawat Bhata Road, C.A.D Circle,Kota (RajasthanlPh. No. 0744-25OO 429,Email: [email protected]
', 33tfort{'"^' . ::! ;J, ':'n!tl,i? /' { ''
Subject: Consultoncy Service for Authority's Engineer for Supervision of civil constructionworks for Construction ol Northern Koto Byposs from Design Ch.0.000 (km 391/100of NH-76) to Design Ch. 10/300 (Rongpur road) [Pockoge - l] ond from Design Ch.
10/300 (Rangpur road) to Design Ch. 74.200 (km 71/700 of SH-33) with link road of452m length with SH-33 [Packoge - ll] in the state of Rojosthon on EPC mode underNH (O). Reg. Replacement of Brldge/ Structural Engineer.
Sir,
As per the clause no. 4.5 (a) page no. 21 of Agreement, we hereby propose the replacement of
Bridge/Structural Engineer. The approved Bridge / Structural Engineer is not willing to discharge his
duties as the work of major Bridge has already been completed upto the stage of Sub structure
before appointment of Authority Engineer.
Orisinal Personnel Name of Replacement Proposed Position
Mr. Pravin P Sanghani Mr. Sujeet Kumar Bridge / Structural Engineer
The proposed candidate will be available for an interview after confirmation of dates from your
office. His CV is enclosed for further needful action.
Thanking you,
Yours faithfully,
>{A*<:,/ \ ,x't,"
(Deepesh T
Authorized
it 'rr)iir';'-)iX
PROPOSED POSITION
NAME OF FIRM
NAME OF STAFF
PROFESSION
DATE OF BIRTH
YEARS WITH FIRM/ENTITY
NATIONALITY
BRIDGE / STRUCTURAL ENGINEER
PIONEER INFRA CONSULTANTS PVT' L
SUJEET KUMAR
CIVIL ENGINEERING
srH JULY, 1967
AVAILABLE FOR THIS ASSIGNMENT
INDIAN
MEMBERSHIP OF PROFESSIONAL SOCIETIES
DETAILED TASKS ASSIGNED :
r Assist Team Leader cum Senior Highway Engineer in review and improvement of design and drawings
related to structures.. Review implementation schedule of engineering design as submitted by the Contractor'
. Supervision of work during construction / renaoilitatlon o{ bridges, interchanges and other related structures
. Supervision of work during construction stage'
. Assist Team Leader cum Senior Highway-Engineer in review and improvement of design and drawings
related to structures.r supervision ol work during construction / Defect Liability period
NIL
S.No.
Nime ofEmployer
', F.oet
,''ii-itProject Name
t.
Period Ag,signment in theProieCt
Client bfthe Proiect
RematrkFrom
To
,l
Lavlinlnfrastruct
ureProject
Ltd.
cSN Assistant
Construction
Manager
(Project)
Oesign & Construction Supervision(DSC.5 to 175.433) Services forRajasthan Urban SectorDevelopment lnvestment Program(RUSDIP) {Package-|l} in Five
Towns of narnelY Barmer, Churu,
Jaisalmer, Nagaur & Sikar, in the
state of Rajasthan, funded bY ADB
under FIDIC Condition of contract.
Jun2015
o4July201
6
As detailedbelow.
RajasthanUrban
lnfrastructure
Development Project
Al- AsabContractin
g
Company
SeniorBridge
Engineer
Construction, UP-gradation &
Rehabilitation of Four lane Highwayfrom Habsan to Madina ZaYed in
United Arab Emirates (UAE).
Mar2013
Mar201
q
As detailedbelow.
ADNOC(Abu DhabiNation OilCompany)
KNR-Patel
lnfrastructure (P)
Ltd.
BridgeEnginee
r
Wloening anO Strengthening of
existing 2 lane to 4 lane FlexiblePavement lrom API KarnatakaBorder to Avathi Village, Section of
NH-7 from Km 463.60 to Km 524.00in the State ol Karnataka (Package
No. C-lllA9) on BOT (Annuity)basis.
Jan2009
Feb201
e
As detailedbelow.
NationalHighways
AuthoritY oflndia
tcT (P)Ltd.
BridgeEnginee
r
ConsultancY Services forConstruction SuPervision &
Rehabilitation of M-8 (from
Kibbanahalli to Huliyur section of
SH-150A) in the state of Karnatakaunder Karnataka State HighwaYs
lmprovement Project; Funded bY
World Bank, executed under FIDIC
JanzUU4
Dec200
8
As detailedbelow.
KarnatakaState
HighwaYslmprovemen
t Project(KSHIP)
'l nl l'D
(APPENDIX B-s)
,$.:if,l'u;
l.; .
l;;!llF.,rri**1=11fln;
Perlod As*igQryE::Fr's'rut::
:fE::
condition of contract;
HindustanConstrucli
onCompany
Ltd,
BridgeEnginee
Construction of Mumbai- PuneExpressway (Section B) from Chockto Adhosi Section, BOT Project'Rigid Pavement; FIDIC Condition ofContract; in the state of
Maharashtra; Lane- 6; Length-16.629 Km.;
Apr2000
Dec200
.1
As detailedbelow.
Maharashtrastate RoadDevelopmen
tCorporation(MSRDC)
c , UshaConstructi
onCompany
CivilEnginee
r(Structur
e)
Construction and EngineeringSupervision ol Maior Highway Bridgeof Length- 957.0m at BombaY (NowMumbai) in the state of Maharashtra;Length- 957.0m; Lane- 2; SPan65mts and two abutment of 56 mtseach Arrangements- construction ofpear with bearing PTFE ;
Foundation- Well (14 on water and
two abulment Nos); SuPerstructure-post tensioned cast in suit girder.
Aug.'t997
Feb200
0
As detailedbelow.
ldealRoadBuilder
JogEngineeri
ng Ltd.
Engineer (Civil)
Construction of 2 Major Bridges onPalm Beach Marg (6{ane with dualcarriageway from Vashi to BelaPur,
8.00 kms. tlexible pavement) at NaviMumbaiin the state of Maharashtra.
0ct'1994
Jul199
As detailedbelow.
Citylndustrial
Development
Corporaiion
KEY QUALIFICATIONS :
Mr. Sujeet Kumar is a Graduate in Civil Engineering having extensive professional experience of more than
Zl years, out of which 2 years in UAE involved in construction supervision of infrastructure works like bridge'
roads and has been extensively involved in the construction supervision bridges and cross drainage structure
for national and state highwayi funded by national and international funding agencies like world bank, ADB,
NHAI etc. and ensure execution as per'modern method of construction design standards, technical
specification as per MoRT&H, lRC, AASHTO, ASTM, lS and BS codes ol standards and statistical OIJQC
procedures for construction procedures for construction of bridge- Experienee also includes bridge inventory'
construction and quality conirol, soil and material investigation, lield testing of matprials, construction ol cros$
drainage works, open/welypile ioundations, cast in-situ PSC girders, Box Girders, pre-slressed voided slabs'
Experilnce also covers woik verification as per contract specificalions and drawings, supervision ol execution
works w1h quality assurance and various routine test as per specifications, etc'. Possess sound knswledge in
the fields of site executlon, heavy various construclion, quantity estimation for all civil works, ability to
communicate at all levels and funitions effectivety whelher individually or as a leam, demon$trated ability ta
efiectively plan, coordinate and meet deadlines, Lelf-driven, able to prioritize tasks and implement changes
smoothlyl a result-oriented person with a strong analytical mindset, possessing excellent presentation,
organizational and team building skills'
EDUCATION :
o ff. E. (Civil), from University of Mysore, Karnataka in 1994
He is famillar with IRC bridge codes of practices and MoRT&H specifications- He has. a thqro-u-qh
;5f5ft al station' qualitY controU
|55-udc. procedures and implementation of contract condltlons including FIDIC and BOT forms of
Contract.
(APPENDTX B-s)
EMPLOYMENTRECORD :
FROM JUN 2015 : TO 46 July 2016
EMPLOYER : M/S SNC-LAVALIN INFRASTRUCTURE PROJECT LTD.POSITION HELD : ASSISTANT CONSTRUCTION MANAGER (PHOJECT)
Design & Construction Supervision (DSC) Services for Rajasthan Urban Sector DevelopmentInvestment Program (RUSDIP) (Package-ll) in Five Towns of namely Barmer, Churu, Jaisalmer, Nagaur& Sikar, in the state of Rajasthan, funded by ADB under FIDIC Gondition of contrac$ Client- ProjectDirector, Rajasthan Urban lnfrastructure Development Project; Project Cost- INR 484 Crore;
As Assistant Gonstruction Manager (Project), responsible for Submission of daily and monthly progressreport. Checking of structure layout and measurement bills, maintaining close interaction with client lor anychanges required for contract drawing as per site feasibility. Execution of foundations, substructure andsuperstructure. Assisting in general administration and contract management, Ensure the construction worksare accomplished as per contract documents, Supervise the construction of works in accordance with policiesand procedures established by client, Administer, monitor and direct the supervising staff and specialist teamon the contract, Establish and maintain quality plan for site activities, Liaise wilh lhe quantity surveyorregarding all measurement and contractual matters to ensure a consistent approach of work, Maintainnecessary records/data to prepare reports for the construction manager as required, Liaise with the ProjectManager/Client's Engineer/Nodal Officer regarding work progress, Forurrard daily physical and financial reportsto consultant, Prepare monthly progress report, quarterly progress reports for submission to consultant.
FROM MAR2013 : TO MAR2015EMPLOYER : AL-ASAB CONTRACTING COMPANYPOSITION HELD : SENIOR BRIDGE ENGINEER
Construction, Up-gradation & Rehabllitation of Four lane Highway from Habsan to Madina Zayed lnUnited Arab Emirates (UAE); Length- 36.00 Km; Lane- 4; Client- ADNOC (Abu Dhabi Nation OilCompany); Project Cost- 82.2 Million Dirham (lNR 148 Crore);
Bridges details:
/ Major Bridge at Km 11.26; Length- 140.0m; Span Arrangemenl- 7 x22,Am; Pile Foundation; PSCgirder with post tensioned;
,/ MajorBridgeatKm 18,9;Length-T0.0mSpanArrangement- 1x25.0m+ 1x20.0m + 1x25.0m;@Foundation; PSC girder with post tensioned;
r' Major Bridge at Km 32.4; Length- 60.0m; Span Arrangement- 3 x 20.0m; Pile Foundation; PSCgirder with post tensioned;
/ 10 No's. Minor Bridges of Length between- 30.0m to 40.0m with Pile foundations; SpanArrangement-Two span; Superstructure precast girder with post tensioned
,/ 15 nos. RCC slab/ box culvert, open foundations
:
/ MajorBridge; Length-T0.0mSpanArrangement- 1x25.0m+ 1x20.0m+ 1x25.0m; Removalandreplacement of Approach Slabs, Removal of damaged Concrete Wearing Course and laying of MasticAsphalt with Bituminous concrete over Deck Slab, Replacemenl of RCC Railings with Crash Barriers,Floor protection works and painting
As Senior Bridge Engineer, Responsible for preparation of project planning related lo resource, finance,manpower and close follow up work with respect to the schedule agreed; Supervision and execution ofcomplete civil works of bridge construction and approach road as per drawing and specification; Preparationand supervision of all the technical details and data related to Survey, Fabrication, RCC work, Reinforcemenlwork etc.; Supervision of sinking of wells, tilt and shift and their records; Supervision for execution of Well caps,Piers, Pier caps, Deck slab, Crash Barrier etc.; Supervision of Soil tests in the Wells and their data; Evolve andimplement quantity and quality controls procedures; Preparation of Bills, Daily Progress Reports, MonthlyReports etc.; Management of various staff and machinery and activities for project implementation and co-ordination with head of{ice and government officials; and Co-ordination with Forest Department, Govt. agenciesfor removal of hindrances along NH and construction site. Cost of the Project. Innovative and Modern
- ./*r\o
(APPENDTX B-s)
construction techniques and methodologies were adopted in the proiect using latest equipment withbest international practice.
: TO FEB 2013: M/S KNR'PATEL INFRASTRUCTURE (P) LTD., HYDERABAD: BRIDGE ENGINEER
Widening and Strengthening of existing 2lane to 4 lane Flexible Pavement from AP/ Karnataka Borderto AvathiVillage, Section ol NH-7 from Km 463.60 to Km 524.00 in thc State of Karnataka (Package No.C-|UA9) on BOT (Annuity) basis; Length- 50.40 Km with Flerible Pavement; Lane- 4; Client- NationalHighways Authority of India; Project Cost- INR 442.62 Crore;
Bridge Details:
/ Maior Bridge; Length- 84.0m; Span Arrangement- 4 x 18.0m + 2 x 16.0m; Pile Foundation (Boredpile- 1200mm dia., depth of pile 20.0m 24.0m below cut off level, Total no. of piles- 1342 nos., RCCpile cap 144 nos; Substructure : RCC solid slab, Circular pier 1700mm to 2750mm dia.- 255 No's;Superstructure- precast girder post tensioned girders with Deck slab
/ Vehicular underpasses; Length- 78.0m (4 m x 4.5m- 6 No's.); Open & Pile Foundation;,/ 10 nos. minor bridges, open foundations (concrete quantity = 20000 m3; +O nos. of RCC box culvert
As Bridge Engineer, Was responsible for review of design and making changes in light of site conditions;Checking the setting out ol flyovers, bridge and underpasses; Checking adequacy of formwork and staging;Checking bar bending schedule, reinforcement, cable laying operations; Checking quality of cement concreteand its compaction and ensuring its proper curing; Monitoring the progress of the execution of flyovers, bridgesand underpasses; Testing and quality control of construction materials like aggregate, cement, HYSD steel, HTstrands, POT-cum-PTEE bearings; Supervision of piling operations, pre-stressing operations, profile ofcables, installation of bearings etc. lnnovative and Modern constructioir techniques and methodotogieswere adopted in the project using latest equipment with best internationat practice.
FROM JAN 2OO9EMPLOYERPOSITION HELD
: TO DEC2008r M/S ICT (P) LTD., NEW DELHI: BRIDGE ENGINEER
Consultancy Services for Construction Supervision & Rehabilitation of M-8 (from Kibbanahalli toHuliyur section of SH-150A) in the state of Karnataka under Karnataka State Highways lmprovementProject; Funded by World Bank, executed under FIDIC condition of contract; Length- 36.46 Km; Lane-!; Clienl- Karnataka State Highways lmprovement Project (KSHIP); Project Cost- INR 75.1 Crore;
Bridges details:
{ Major Bridge at Km 18.80; Length- 102.0m; Span Arrangemenl- 6 x 17.0m; Open & Pile Foundation;Superstructure- PSC and T beam Girders with RCC Deck Slab;
/ Maior Bridge Bridge across Arkavathi River; Length- 200.0m; Span Arrangement- 8 x 25.0m; Open &Pile Foundation; Superstructure- PSC and T beam Girders with RCC Deck Slab;
r' 2 No's. of Minor Bridges with open loundations of Length between 20.0m- 40.0m., Superslructure-PSC and T beam Girders whh RCC Deck Slab.
{ 12 nos. RCC Box culvert
Repair & Rehabilitation of Bridqes:
{ Repair & Rehabilitation of Bridge at Km 21.20; Length- 63.72m; Span Arrangement- 4 x 12.0m + 2 x7.86m; Removal and replacement of Approach Slabs, Widening of Structure, Removal of damagedConcrete Wearing Course and laying of Mastic Asphalt with Bituminous concrete over Deck Slab,Fleplacement of RCC Railings with Crash Barriers, Floor protection works and paintinq
r' Repair & Rehabilitation of Bridge at Km 10.0; Length- 53.3m; Span Arrangement- 5 x 10.96m + 1 x8.5m; Removal and replacement of Approach Slabs, Widening of Structure, Removal ol damagedConcrete Wearing Course and laying of Mastic Asphalt with Bituminous concrete over Deck Slab,Replacement of RGC Railings with Crash Barriers, Floor protection woks and painting
FROM JAN 2OO4
EMPLOYERPOSITION HELD
(APPENDIX B-5)
As Bridge Enginecr, responsible for construction supcrvision, reView Of work programme and rpvrew sf
construction methods, minor modifications in design of Lridges/culverts, whenever required during execution'
setting out, reinforgemenl shecking as per tai bending- schadule, checking bridge layout, fixing of
atignirent, quality control and qllafity a*surance, slheduling of works through PEHT analysi3'
Suiervising "nO
*onitoting ";"itu;tion ol maior & mincr bridges as per wolking drawings' cheching ol
foundation layouts, lnvoive in understanding tire design provisions of both bridges / ROBs and culverts'
guiding and checking of reinforcemenl, recti{;ing "ny
alpar*nt.mislakes in respecl o{ them, checking and
controging the proper mix designs, beaming,'eipaniion joint, checking the. adequqcy 3l proper form'work,
rrvind;g;prctl;g'ot concrete iicluding curing operaiions also checking and approving the matedal used lor
tnL irqeci, issu-e site instructions, measrr6meni ol completed works, progres$ monitoring, Conducting
meelings w1h the stall and contractors, verification of contraclor's monlhly billi, monitoring of progress of
the 'vork
with the approved programme. construction of structures as per the best international practices
including modem .on*in*rion pt"iii"". like precast segmental construction precasl I girder construction with
latest casting anct taunching technologies. Familiar with mcdern methode of construction of bridges/ ROB
involving RCC/ pre-strr"i *on"r"ti, aesign standards, technical specilications and statistical Quality
Controflgsuranca procedures lor consiruction of different component ol bridges"
Construction of MumbaF pune Expressway (Section B) from Chock to Adhosi Section, BOT Proiect'
nilia e"r"-ent; FIDIC Condition oi Contract; in the state o! lrt3larashtra; Lane'6; Length- 16'629 Km';
Client- Maharashtra State Road Development Corporation (MSRDC); Proiecl Gost'INR 245 Crores;
Main Features: The work on Section B of the Mumbai- Pune Expressway, which stretches from Chowk to
Adoshi involved the construction of a new six-lane highway from Chowk to Sanjgaon to Adoshi including new
embankments, cutting in all strata, culverts, 03 major bridges, viaducts, drainage arrangement, cement
concrete and bitumen pavements, shoulders, crash barriers etc'
Bridge Details (Proiect Consists 3 Maior Bridges):
/ Major Bridge; Length- 156.0m; Span Arrangement- 7 x 18.0m + 2 x 15.0m; Foundation'Open
toundations; superstructure- PSC Girder, PSC solid and voided deck slab;
/ Major Bridge; Length- 196.0m; Span Arrangement- 8 x 20.0m + 2 x 18'0m; Foundation- Open
foundations; Supersiucture- PSC Girder, PSC solid and voided deck slab;
/ Major Bridge: Length- 230.0m; Span Arrangemen]- 10 x 20.0m + 2 x 1S'Om; Foundation- Open &
pili founditions; Superstructure- PSC Girder, PSC solid and voided deck slab;
As Bridge Engineer, was responsible Jor review of design and making changes in light of site conditions;
Checkin! the setting out of flyovers, bridge and underpasses; Checking adequacy of formwork and staging;
Checking bar bending schedule, reinforcement, cable laylng operations; Checking quality of cement concrete
and iis cimpaction arid ensuring ils proper curing; Monitoring lhe p.rogress of the pxecution of flyovers, bridges
and underpisses; Testing anO {ua[ty conlrol of Jonstruction materiali like aggregate, cement, HYSD steel, HT
strands, pOT-cum-PTlf" Uearings; 'supervision of piling operations, pre-stressing operations, profile- of
cables, installation of u"arings eic. Innovative and'Modern construction techniques and methodologies
were adopted In the proieciusing latest equipment with best intemational practice
FROM MAR 2OOO
EMPLOYERPOSITION HELD
FROM AUG 1997EMPLOYERPOSITION HELD
: TO DEC2003: HINDUSTAN CONSTRUCTION COMPANY LTD', MUMBAI
: BRIDGE ENGINEER
: TO FEB 2000: USHACONSTRUCTTONCOMPANY: CIVIL ENGINEER (STRUCTURE)
(EOUTVALENT TO BBIDG ENGINEER)
Construetion and Engineering Supervision of Maior iishw,pv Hfidog of Length' 957'0m at Bombay
(Now Mumbai) in the ltate of llaharashtra; tenfrtr- sV.0nu tene- 2;Span.65mts-snd two abutment of
io *t* aach Arrangements* construction of peaiwith bearing FfFE ; FqqldatiP,n- lv=ell (14 on water and
two abutment Nosf; Superstructurc- post tensioncd cast in euit girder; Clicnt' ldeal Road Builder;
As Civil Engineer (Structure[ Bridge Engineer, responsible for Ensuring the qualityand conformity with the
standards Jnd specilications presciibed in the contract document. Certification of the RA bills of sub-
contractors, preparing Bar Bending Schedule (BBS). Witness qualiiy control lests as.required. Monitoring
fabrication of'cuiting ti'oge for well loundation. Conducted cable stressing (post tensioning) and further grouting
etc. Setting and laylut f-or structures. Execution the work for foundation, sub-slructure, placing of bearing and
supersrruciure. Ch'eck bar nending schedule lor reinforcement before guttjng"gteel, Rejiolve any d9.:.i9n ald.L//. E rl{ll
(APPENDIX B's)
construction difficulties on the bridges and other structures. Monitoring geo-technical and hydraulic
investigation and interpreiing ttre resilt*...M*"surernant of completed activities. Prepare monthly progress
report. To assure quality contfol lhrough different routins test in accordance with specifications etc' Grouting
with epoxy baseo cemlnt. placemanl o{ elastomeric bearing pads. Placement ol modular sirip seal type
"*p*niion'ioinis. neview of prolect wcrk prog,ramme and its implementation in project progress' Forecasting
physical and financial progress. Mix Design linalisation ol Concreta. Responsible for execution of structulal
v*orks. Preparation ot progress report. Exacute the work as per approved drawings, specilication' codes' lS'
tFtC" MORT&H. periodic Jatinrarun and moniloring quality proOuction ol concrete batching plant' Field testing
of concrete work. Attending ;;eKy review meetin'gs with project manager and monthly review meeting with
consultant
Constructiono|2MaiorBridgesonPa|mBeachMarg@fromVashitoi"i"pui, s.oo rr". neiiUle pavlment) at Navi Mumbai in ttre state ol Maharashtra; Client- City Industrial
Development Gorporation, i,lavi Mumbai; Total Proiect Cost' INR 16 Crore;
Bridges details:
./ Major Bridge No.-l; Length- 100.0m; Span ArranggTgll- 5 x 20.0m; Foundation- Elle foundations;
Superstructure-Hollowdeckslab;ProjectCost'lNR5'25Crore;./ Major Bridge No- 2: Length- 2il).0m; Span Arrangement- 10 x 20'0m; Foundation- Pile
foundations-; Superstructure--Hollow deck slab; Project Cost- INR 10'75 Crore;
As Engineer (Givil), responsible lor Checking and placement of reinforcement as per approved bar bending
""n"Orf" (BBi). S|rutiny and certitying subiontractor's bill. Approval obtaining for temporary diversion for
ln"in ,truriur"l work. Attending meeting yvith consultant and clieni, Reporting to Project Manager on daily basis
for achieving required ptogt;"". Reiiew ol project resources^based on project work programme' .Timelyupdating woil{ programme-covering previous biance works. Checking and reviewing of bitting works and
;i"fi;r"tt;ri, F-r"nning, icneouiinb and monitoring ol progress as per schedule. Day to day coordinating
with consullants for struclural work. Execule the work as per approved shop drawings' specification, codes, lS,
lRC, MORT&H for foundation, substructure and superstructure
FROM OCT 1994EMPLOYERPOSITION HELD
LANGUAGES
Languages
EnglishHindi
: TOJUN 1997: JOG ENGINEERING LTD.: ENGINEER (ClvlL)
ExcellentExcellent
ExcellentExcellent
Spea
ExcellentExcellent
summary of Qualification & Experience vis-a-vis the requirements as per TOR
Requirements as Per ToR(Enclosure B)
Possessed bYthe Staff Member
Break-up of exPerience
erioi Description of the Proiect Man-months
orovided
L Ecsentiel Gualificationsi. Graduatc in Civil
Engineerlng from arecognized universitY
Mr. Sujeet Kumaris a GraduateCivil Engineerfrom MysoreUniversity,Kernataka, 1994
tualcCffir(Proiect) - Design & Construction Superuision
iOScl Services for Rajasthan Urbal S-e-ctor
bevefopment lnvestment Program (RUSDIP)
(Package-ll) in Five Towns of namely Barmer,Churu, Jaisalmer, Nagaur & Sikar, in the siate of
b. ProfessionalExperience of 15 Ycars
He has morcthan 21.6 Yearsof prolessionalexperience
June 2O1 5 -July 2016
O8 Months
G nflO
(APPENDIX B-5)
'i""1\ ;,:.
1.2
@e under FlDlcConditian ol contract;
@gineer - Construction,Up-gradation & Hehabilitation of Four lane
nignway from Habsan to Madina Zayed in
United Arab E{nirates (UAE); Length- 36.00 Km;
Lane- 4; Client- ADNOC (Abu Dhabi Nation Oil
Company); Project Cost- 82.2 Million Dirham(lNR 148 Crore);
March2013-
March 201525 Months
As i eriOge Engineer ' Widening and
Strengthening of existing 2 lane to 4 laneFlexible Pavement from AP/ Karnataka Borderto Avathi Village, Section of NH-7 from Km
463.60 to Km 524.00 in the State of Karnataka(Package No. C-ll/A9) on BOT (Annuity) basis;
Length- 60.40 Km with Flexible Pavement;Lane-4; Client- National Highways Authority of
lndia; Project Cost- INR 442.67 Crore;
January2009 -
February2013
50 Months
As a Bridge Engineer' Consultancy Servicesfor Gonstruction Supervision & Rehabilitation ofM-8 (lrom Kibbanahalli to Huliyur section of SH-15OA) in the state ol Karnataka under KarnatakaState Highways lmprovement Project; Funded
by World Bank, executed under FIDIC conditionof contract; Length- 36.46 Km; Lane' 2i Client'Kamataka State Highwala lmprovement Proiect(KSHIP); Project Cost- INR 75.1 Crore;
January2004 -
December2008
60 Months
As a gridge Engineer - Construction of
Mumbai- Pune Expressway (Section B) fromChock to Adhosi Section, BOT Proiect, RigidPavement; FIDIC Condition of Contract; in thestate of Maharashtra; Lane- 6; Length- 16.629
Km.; Client- Maharashtra State Road
Development Corporation (MSRDC); Project
Cost- INR 245 Crores;
March 2000
- Decernber2003
45 Months
As; citiiEgi#tr (Structure) (Equivalent toBridge Engineer) - Construction andEngineering Supervision of Maior HiqhwayBridoe of Length- 957.0m at Bombay (Now
Mumbai) in lhe state of Maharashtra; Length-
957.0m; Lane- 2; Span 65mts and two abutmentof 56 mts each Arrangements- construction ofpear with bearing PTFE ; Foundation' Well (14
on water and two abutment Nos);
Superstructure- post tensioned cast in suitgirder; Client- ldeal Road Builder;
August 1997
- February2000
32 Months
As a Engineer (Civil) - Construction of 2 MajorBridges on Palm Beach Marg (6-lane with dualcarriageway from Vashi to Belapur, 8.00 kms.
flexible pavement) at Navi Mumbai in the state
of Maharashtra; Client- City Industrial
Development Corporation, Navi Mumbai; TotalProject Cost- INR 16 Crore;
October1 994 - June
1 99733 Months
(APPENDIX E'5)
March2013-
March 201525 Months
B-r--iageEngineer'Consiruclion,Up-gradation & Rehabilitation ol fsgf-lAneHigfway lrom Habsan to Madina Zayed in
United Arab Etfirates (UAE); Length'?9 0o Kf;Lane-i-Tnt+Druoc (Abu Dhabi Nation oilConrpany); Project Cosr 82-2 Million Dirharn
(lNR 148 Crore);
Having 21 Year 9Monthsexperience inConstruction /ConstructionSupervision ofbridge /interchange / anYother structures
c. Experience of at10 years experience inConstruction /ConstructionSupervision of bridge /interchange / anY otherstructures
January2009 -
February2013
50 Months
As a Br'tdge Engineer - Widening and
Strengthening of existing 2 lane to 1-le!eFlexible Pavement from AP/ Karnataka Border
to Avathi Village, Section of NH-7 from Km
463.60 to Km 524.00 in the State of Karnataka(Package No. C-ll/A9) on BOT (Annuity) basis;
Length-- 60.40 Km with Flexible Pavement;
tan6-4; Client- National Highways Authority ofIndia; Project Cost' INR 442'67 Crore;
January2004 -
December2008
60 Months
for Construction Superuision & Rehabilitation of
M-8 (from Kibbanahallito Huliyur section of SH-
150A) in the state of Karnataka under Karnataka
State Highways lmprovement Project; Funded
by World Bank, executed under FIDIC conditionoi contract; Length- 36'46 Km; Lane- 2; Client-Karnataka State Highways lmprovement Project(KSHIP); Project Cost- INR 75.1 Crore;
a B'ridge Engineer' Consultancy Services
- December2003
45 Months
As a Tr'td-go Etgineer - Gonstruction of
Mumbai- Pune Expressway (Section B) fromChock to Adhosi Section, BOT Project, Rigid
Pavement; FIDIC Condition of Contract; in the
state of Maharashtra; Lane- 6; Length- 16.629Km.; Client- Maharashtra State RoadDevelopment Corporation (MSRDC); ProjectCost- INR 245 Crores;
August 1997
- February2000
32 Months
ns a Civil Engineer (Structure) (Equivalent toBridge Engineer) ' Construction and
Engineering Supervision of Maior. High.Wav
Pridpe of Length- 957'0m at Bombay (Now
Mumbai) in the state of Maharashtrai Length-957.0m; Lane- 2; Span 65mts and two abutmentol 56 mts each Arrangements- construction olpear with bearing PTFE ; Foundation- WeJl (14
on water and two abutment Nos);
Superstructure- post tensioned cast in suitgirder; Client- ldeal Road Builder;
October1 994 - June
1 99733 Months
Bridges on Palm Beach Marg (6-lane with dualcarriageway from Vashi to Belapur, 8.00 kms'flexible pavement) at Navi Mumbai in the stbteof Maharashtra; Client- City IndustrialDevelopment Corporation, Navi Mumbai; TotalProjcct Cust- INB 16 Crore;
As a engineer (Civil)'Construction of 2 Maior
i\/ af ll..:--r lf . rxor O il{O
(APPENDIX B-5)
d. Must be familiar withmodern methods ofconstruction ofbridges/ ROB /Flyover involving RCC/ pre-stress concretedesign standards,technicalspecification andstatistical QualityControl / Assuranceprocedures forconstruction ofdifferenl componentof bridges.
He is familiar with IRC bridge codes of practices and MoRT&Hs pecif icatio ns. He hq-s-,, s, Thorouuh undPJ^p"j"*n dino and experiencewith lnternational 'best practicebridqe construction. use of modern techniques and latest surveyequipments like total station, quality control/ assurance proceduresand implementation of contract conditions including FIDIC and BOTforms of Contract.
Experience in similarcapacity insupervision of 2 MajorHighway Bridges onPile/Well foundation.
He has aExperience insimilar capacity insupervision of 6Major HighwayBridges on Pile /Wellfoundation.
As a Senior Bridge Engineer - Construction,Up-gradation & Rehabilitation ol Four laneHighway from Habsan to Madina Zayed inUnited Arab Emirates (UAE); Length- 36.00 Km;Lane- 4; Client- ADNOC (Abu Dhabi Nation OilCompany); Project Cost- 82.2 Million Dirham(lNR 148 Crore):
March201 3-
March 201525 Months
As a Bridge Engineer - Widening andStrengthening of existing 2 lane to 4 laneFlexible Pavement from AP/ Karnataka Borderto Avathi Village, Section of NH-7 from Km463.60 to Km 524.00 in the State of Karnataka(Package No. C-ll/A9) on BOT (Annuily) basis;Length- 60.40 Km with Flexible Pavement;Lane-4; Client- National Highways Authority offndia: Proiect Cost- INR 442.67 Crore:
January2009 -
February20'13
50 Months
As a Bridge Engineer - Consultancy Servicesfor Construction Supervision & Rehabilitation ofM-8 (from Kibbanahallito Huliyur section of SH-150A) in lhe state of Karnataka under KarnatakaState Highways lmprovement Project; Fundedby World Bank, executed under FIDIC conditionof contract; Length- 36.46 Km; Lane- 2; Client-Karnataka State Highwaya lmprovement Project(KSHIP): Proiect Cost- INR 75.1 Crore;
January2004 -
December2008
60 Months
As a Bridge Engineer - Construction ofMumbai- Pune Expressway (Section B) lromChock to Adhosi Section, BOT Project, RigidPavement; FIDIC Condition of Contract; in thestate of Maharashtra; Lane- 6; Length- 16.629Km.; Client- Maharashtra State RoadDevelopment Corporation (MSRDC); ProjectCost- INR 245 Crores:
March 2000- December
200345 Months
As a Givil Engineer (Structure) (Equivalent toBrldge Engineer) - Construction andEngineering Supervision of Maior HiohwavBridoe .of Length- 957.0m at Bombay (NowMumbai) in the state of Maharashtra; Length-957.0m; Lane- 2; Span 65mts and two abutmentol 56 mts each Arrangements- construction ofpear wth beanng Pll-E ; Foundation- Well (14on water and two abutment Nos);Superstructure- post tensioned cast in suitoirder; Client- ldeal Road Builder;
August 1997
- February2000
32 Months
(APPENDIX B-5)
As a Engineer (Civil) ' Construction ot 2 MajorBridges on Palm Beach Marg (6-lane with dualcarriageway from Vashi to Belapur, 8.00 kms.llexible pavement) at Navi Mumbai in the stateof Maharashtra; Client- City lndustrialDevelopment Corporation, Navi Mumbai; TotalProiect Cost- INR 16 Crore:
October1 994 - June
1 99733 Months
Experience insupervision ofRehabilitation andrepair of 2 nos.Bridges
He has aExperience insupervision ofRehabilitationand repair of 5nos. Bridges
As a Senior Bridge Engineer - Construction,Up-gradati<ln & Rehabilitation of Four laneHighway from Habsan to Madina Zayed inUnitqd Afab Ernirates (UAE); Length- 36.00 Km;
Gne" +; Clienl" ADNOC (,Abu Dhabi Nation Oil
Company); Project Cost- 82.2 Million Dirham(lNR 148 Crore);
March2013-
March 201525 Months
Ts ;-rid$-ngineer ' Widening andStrengthening of existing 2 lane to 4 lane
Flexible Pavement from AP/ Karnataka Borderto Avathi Village, Section of NH-7 from Km463.60 to Km 524.00 in the State of Karnataka(Package No. C-ll/A9) on BOT (Annuity) basis;
Length- 60.40 Km with Flexible Pavement;
Lane-+; Client- National Highways Authority offndial Proiect Cost fNR 442.67 Crcre:. -
January2009 -
February2013
50 Months
S. Not more than 65Years of age.
N/A
a. Post Graduate Degreein StructuralEngineering
N/A
Experience as a BridgeEngineer in HighwayConstruclion projects.
b. Yes he hasExperience as aBridge Engineer inHighwayConstructionprojects.
As a Assistant Construction Manager
{Project} - Design & Construction Supervision
{DSC} Services for Rajasthan Urban SectorDevelopment Inveslment Program (RUSDIP)(Package-ll) in Five Towns of namely Barmer,Churu, Jaisalmer, Nagaur & Sikar, in the slate ofRajasthan, funded by ADB under FIDIC
Condition of contracl;
June 2015 -July 2016
08 Months
As a Senior Bridge Engineer' Construction,Up-gradation & Behabilitation ol Four laneHighway from Habsan to Madina Zayed inUnited Arab Emirates (UAE); Length- 36.00 Km;
Lane- 4; Client- ADNOC (Abu Dhabi Nation Oil
Company); Project Cost- 82.2 Million Dirham(lNR 148 Crore):
March2013-
March 201525 Months
Is a griOgB Engineer ' Widening and
Strengthening of existing 2 lane to 4 laneFlexible Pavement from AP/ Karnataka Borderto Avathi Village, Section of NH-7 from Km
463.60 to Km 524.00 in the State of Karnataka(Package No. C-ll/A9) on BOT (Annuity) basis;Length- 60.40 Km with Flexible Pavemenl;Lane-4; Client- National Highways Authority oflndia: Proiect Cost- INR 442.67 Crore;
January2009 -
February201 3
50 Months
As a Bridge Engineer - Consultancy Servicesfor Construction Supervision & Rehabilitation ofM-8 (from Kibbanahalli to Huliyur section of SH-150A) in the state of Karnataka under KarnatakaSlate Highways lmprovement Project; Funded
by World Bank, executed under FIDIC conditionof conlract: Lenoth- 36.46 Km; Lane- 2; Client-
January2004 -
December2008
60 Months
alr -3 aal
(APPENOIX B-5)
Certification bv the Candidate:
l, the undersigned, Shri Suieet Ktmar, 9o Shri Kapildeo Narayan Kumar, Address' Road No' 9' Patel
Nagar (East), patna, Bihar, phone / Mobile - 08769277628. Undertake that this CV correctly describes
myself, my qualilication and my experience and Employer would be at liberty to debar me if any information
given in the CV, in particular the Summary of Qualification & Experience vis-d-vis the requirements as per TOR
is found incorrect. I further undeftake that I have neither been debarred by NHAI or any olher central/stage
government organization nor left any assignment with the consultants engaged by Employer / contracting firm
(firm to be supervised now) for any continuing work ol Employer without completing my assignment. I will be
available for the entire duration of the current project "Gonsultancy Services for Authority's Engineer for
Supervision of Civil Construction work for Construction of Northern Kota Bypass from Design Ch'
O.000 (km 391/100 of NH-76) ro Design Ch. 10/3OO (Rangpur road) [Package - ll and from Design Ch.
10/300 (Rangpur road) to Design ch. 14.200 (km 1lr/oo of SH-33) with link road ol452m length with SH-
33 [package - ll] in the state of Raiasthan on EPC mode under NH (O)." lf I leave this assignmeni in the
middle of the work, Employer would be at liberty to debar me from taking any assignment in any of the
Employer works for an appropriate period of time to be decided by the Employer. I have no obiection if my
services are extended by the Employer for this work in f uture'
I further undertake that my CV is.being proposed for this project by Highway Engineering Consultants,
Bhopal (M.p) in Association with Pioneer Infra Consultants Pvt. Ltd. Jaipur, (the applicant firm) and I
have not given consent to any other consultant(s) to propose my CV for any position for this project'
I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to
which consultant's firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake
any employment in Employer projects during the period of assignment of this project and Employer shall
consider my CV invalid till such time.
GmAaGEtate H'tghways lmprovement Proiect(KSHIP); Project Cost- INR 75.1 Crore;
Is;-Em$-€ntineer - Construction of
Mumbai- Pune Expressway (Seciion B) from
Choclc to Adhosi $eclion, BOT Proiect, Rigid
Pavement; FIDIC Condition of Contract; in the
state of Maharashtra; Lane' 6; Length- 16'629Km.; Client- Maharashtra State Road
Development Corporation (MSRDC); ProjectCost- INR 245 Crores;
March 2000
- December2003
45 Months
As a CFil Engineer {Structure) (Equivalent toBridge Engineer) ' Conslruction and
Engineering Supervision of Maior llighlvavBridqe of Length' 957'0m at Bombay (No.w
fru6bai) in the state ol Maharashtra; Length-957.0m; Lana- 2; Span 65mts and two abutmentof 56 mts each Arrangements- conslruction af
pear with bearing PTFE ; Foundation- We,ll. (14
bn water and two abutment Nos);
Superstructure- post tensioned cast in suitqirder; Client- ldeal Road Builder;
August 1997
- February2000
32 Months
ffi;Hdneerle-vit)' Construction of 2 Major
Bridges on Palm Beach Marg {6-lane with dual
carriageway irom Vashi to Belapur, 8'00 kms,
llexible pavement) al Nlavi Mumbai in the staieo{ Maharashtra; Client- City lndustrialDevelopment Corporation, Navi Mumbai; TotalProiect Cost- INR 16 Crore;
October1 994 - June
1 99733 Months
al, ^a ^--:^^. v..--- aa ^aitl
(APPENDIX B-s)
I undertake that I have no objection in uploading/hosting of my credentials by Employer in public domain'
I undertake that I have no objection in uploading/hosting of my credentials by Employer in public domain'
For Key Personnel having intermittent inputs, add the following:
I furrher certify that I am associated with lhe following assignmenls as on date (as on 7 days prior to due date
for submission of proposal) including those for which LOA has been received by the firm and the inputs in
these assignments shall not effect the work of the current assignment.
Certification by the Firm:
The undersigned on behalf of Highway Engineering consultants, Bhopal (M.P) in Association with
Pioneer Inlra consultants Pvt. Ltd. Jaipur, 8-307, 10-B Scheme, opposite Narayan Niwas, Gopalpura
Bypass, Jaipur -302016 (Raj.) certify that the qualification and experience details ol S/o Shri Kapildeo
Narayan Kumar, Addr6ss- Road No. 9, Patel Nagar (East), Patna, Bihar, Phoni / Mobile - @769277628,
as described in the CV has been checked and lound to be correct. lt is also certilied that Shri Sujeet Kumar,
9o Shri Kapildeo Narayan Kumar, Address- Road No. 9, Patel Nagar (East), Patna, Bihar' Phone /
Mobife - 087692TT628. (name of the proposed personnel and address) to the best ol our knowledge has
neither been debarred by NHAI or any other Central/State Government organization nor left his assignment
with any other consulting firm engaged by Employer / Contracting firm Highway Engineering Consultants'
Bhopal (M.p) in Association with Pioneer Infra Consultants Pvt. Ltd. Jaipur, for the ongoing projects' We
understand that if the information about leaving the past assignment is known to Employer, Employer would be
at liberty lo remove the personnel from the present assignment and debar him for an appropriate period to be
decided by Employer.
g\+ lr t
Day/Monthl/ear
Name of Assignment Client Date ofLOA
Likely start(Month /
Year)
Likely end
(Month /Year)
Total input of
the person
(man-months)
N.A" N.A.
(Signature of Key Fersonnel) Day/MonthNear
e..:^^a V..6^- 4.1 ae 1O
SUJEET KUIIAR:_
:; _gi::_:i. I . ::.: :aj::j
titfli& i.d
'i:1 s'l i'1,o ' t.:It: '-: iiirr] SHERPUR, BIHAR
-. ri'-l; ir;i +' =;r':
M55894A7
19 67
*$-.J- oc.a *rar! PATIIA
22141 /2A15 2'tiaIt2a25
P< I ND<<SU J EET<KUi{AR<<<<
H 5 5 8949 7<E r N D6 70 70 57 n25A 1 21 3 < <<< < < <<< << <<<< 4
*5.tr'7__
' .-, , :- ..i ir1'- := ,j. . i: ..
KAPIL DEO NARYAN SINGH-: :: ,11 i
SHEELA SINGH--":r:.-i:-:..: , i':, :,,:PINKI KUI{ARI
_r' :: .-.
H.N0.-15,R0AD flo.-0g,pATEL NAGAR (EAST
P0/PS-SHASTRI ilAGAR,PATilA
lll lll lltltilt lt |l|lltl lt lilM5589487
P I N : 8 0 0 0 2 3 , B I H A R / r N D I A
A3567366 27 tOEt1997Fia- - ijj;s 1i.l
PAl 07841 579981 5
FATNA
::.4.
&:..;fu.:':j.*.:
..::1:".:.]': -
,
".f&: ,
.'+ l.t
9...
r.'aa:+t :: :::: 4:: # '&;. .rI: :
.r :, "l' {ll: I , *. "v-. *f # :.
:l ,, a
'tii
tt:..a:.41: lNi:+:.:)Y,tlti.
t:."{r1
,.i _.i: l lr "
*fx$
rbl'. vlt
M',t
r)}*trtlc.tdffifi''*
Mh rywr KumisrBJ*
Taplldro S*ryvr Singlr"*sd *o" *. fhtel Na{ertessr}.f*u* Sih*r
*t*<-1.'*s''J,ft4kr@trryr*l*"{'\st*rerW.A{rrtr9urtil,*, trd ftoa{Ph }{&. |
" t d$f l{rr, ftln Ciry
Hgtbt iu.t'.} tur l,9r , .rrq6r{ fi4 \t7 t*it84.1t wtw'*r$
l{l rtt r l9 {si7 {{0
'rx *9! :T{ r*tr 4{l,6f**w"kd,}'#'ir,atnm'.rnttanxnin{rr,cartl
8y{orricrsr-t Nr,-r{Afttfi/ ls0?8 I,q74
2f luty,Zl)ti
$ENrMr, $rfta lfinun,
lf't. nl $34t'-l"xtl#in Infisf,{nlgaro*,Pu1,_ltd,. *tkctl*c ym*,ag,jurr plearerl to ir}rjrr'lt }xxr ifi d1(rr *affi" lllsill b( $El mdeErnslr b &ffiurr &tl ttlr_{nlprofer<qpl*tee r*la$nm*hip t"* rne Lrginning, ii l$ntlgting ard ir pmnp*m to r***!t in u rnilrrlil se{rls if prrnit*l*nxl x*i**rr'qi$1.
1'ou ry trci$ rypoinxxl rpecificilJy for pmlidrn$ sen'icrs on rrur *Dsisgn & Con*trnctbr:.gThlo..g.ofjflItl-q!5) $qritf,rfx*rqc - ll {l$rgrur} urdry RUS$fptRUtDp pH-1}:At P tr".T6lttD'il00?ilipro$or- yotlrtmprn;mcnr ii co-rsrmin$5 *'irh rhis prnjerx. \,ou wiil$trk- lb{ thir pr@* till comgleri*n. Thir t+:*ei nl*rrrdr'rr:i rhs i.rr'r a*: e*r*iiions of yarrrsgolnmgtt q"y opqe{ af j}i{l.tavn}in t*fraetrircfsrd pvr- kd. {St" tN*llA}" Fl*as* reod dlctsttaf sxt wrdition* c*rufir{ly rrxl i*dlatn Snur.scecF{ao{c E sig*ing l.r,rt}r cr:pi*x rif d.r;s *pprinunanmW tbt *lhnvtag rrs rbc Twn* *xrf Cimiirlo*xi
|.i,ryft*ffi Ycn ls*e been ryp*ir*rf 4,$ aa*i*{*!t canrtrefilrn hlrnrgrr.tJ_-OFirttivc*; Ya*slmlt be mrxurhblc fu({ualit} *ai* s*sluirsy o*y*ui*x$gr}fif fuirrrion*.I "3, {hria: Yotr li*rcrirxut durir.r i t&tLs rhali inctirde t*l mr tirrriLd r*1,I I ! Rcepffi$ibh fr-r Consnrrion ecrivitiqs & over all pnrjog"t ercculxrrr.13,:' Co-ordinadon *irh lP['!U' lFtU Lin< agcnci*. r*nnrr:rrt€rs. di\i$n rca;n for rhra
eoll*eiion, pmlud pmpwrliurr iud i* pr*"rons*rueri*r* *r:tirhi*x durlr,rg*rxrxutien.l-;}.3" Efr,sctirc anrl rcgular.\trllr^*it.* for the *q:r| *nil acrs$rs their gtlaiity and cn*rrgmriry
nirlt ti*c larrJurdr" tpe*itirali*ns arr$ dril*i*gs prcwrihcd in *rc r*ntnxt nnrl g;ri*cerltlk+rl llx tll*.org,
'"- ,ffiffiW"qqW$rf l'or qualrty cmtul atd *ork manr"rai lirr esch *tugrolcr t-md.*l" lmJ eit: &:ryy &t qpaBry oarrul usr rfld trvifir {rsir ob*rnincd fmn thc mr;nrc{im $u,*rxi wift t|lr xcuwy cf xl*}r rirrr
1J"5" R*rdorn cte*hJ*g sf tlx rce*qd*, *xrrying s$t tiei{r inqreciorur snd indqrsrrr1$t 1gcrr.As*ifti.tcr in rftird isfty irr*p*riarr *hrnewr n$sirsd. "
I 'l 6, A*sis{ongc in tehicting. of .vearll' phlxital {ind fitt*rrlnl la{gcli o!'ttrc r,rnjc$ and preps,r*ttdt planr a*xracdklgil. prrp:u'ation of Esr C:fuafl" fr**na;tim Sitxdr:ls.'ttlritxsorll{nc{isn dr*rrixg* I[ a*b*ilr drulrilr$s ftrr *ll prajr,rr,t iisliviti$r. clr. rrd adhcrcptoject $clffilul ir:g {n,l x*g5lcx.l f{.}|re{ljr+ flcitrurcj-
{Pagr I ofi)
rrlrsr s.tf Sffi;[:{l{LLll{ {i.e
rt'txtf 'frn
( .) I , *s lHricrt oltlt trr*ra*rd rys hp , i, ry* diri*x i t mf.$*rfar.a,Sfn6 a? l*iirr, * ,lqe.. r la, *{dsr $n., l*r!tr\a} }A4nr Iitlrf Alhr ldryaF*. lifiilt{. bq|R *tr }.l6i.rir. dr.fr f,saa|| {lt!#**d, t$Ndror, {.stwt, r*f*ril, i+icrgfrrfSifHr,
,{***, ffin , *ffffA |*|n6l$l,sf. $qeF, Aiff*llt'i, tbriF1 Llintlddt}*ti, l{fris" rrrir{ {r}e f{,!t*" fd*- f}i*il{A |||*
ri
ffiK
CAL A$A8 E$T.Glx.isArf $ri ff *IlAl ?,t8
T.CI }1rH0{*, II LllY rgtGmil,-Jt grrrg,p!l
08 June,2Q15
It is cnti$ that Mr. Sule* Kumar (Nationality-Indian) has worked with us as Sf,NIOR BRIDCEENCINEER on Up-gradation & Rehabilitation of36 KM (lncludes 3 Maior Bridgcs) long Four laneHighrvuy from Habsan to Madina Zayed in UnitedArab Ernirates frorn March 11, 201.3 throughMarch 31. 2015.
Mr. Sufeet Kumar, is a mahlred engineer havingvery gcnd constntction knnwledge, becomes areal construc.tion mernber in cas€ of anyem€rgencies at site and leads efficienrly to solvethe problems. Durtng this tenure we have founohltn sincere and judlclous.
We wish him all the success in his life ahead.
Thankingyou
tlohmoudAl MranlrJ.r.r{rt'#l
Vice President.'{_jU e*i
i{ .! ' r ;l $ujeet Xrmrar F-}s ( {g*J+ # \ :r il).'' l-r ! t. 'ii.
- *--rS !*+ -**+^l .r*L -J---*t -! *_,r{:"r_ 36 rS 1;_:q, 3 "*,+ +l**_-i;)
! i--*I ijrl" *rl ltJ- jr3;,3 gr_-Jr ;-;t_j5.'jlijaqflr.j;it Jtrlli,,, ir-gl i" rjJt..;lJl
-rJ-Zttl 3.J.J}j' -ti ,,;1 2015
Sujeet t{rfner i.{JS' }L*;;}.':'*,*ir**lLi;xe'*--:.$.:-*, *x, ry----.+.1 | r.".* *L-;j1 -.-_ijl.tt *6f,l : j;,j gl ,::}nr ;$jL-$t,.j6jr. g:X-l hL--& -r.
Jti $.jgt_*ill. ;bt_i on.ijL_*rj u:-+rdi,,..trlui-n$l
.ri----.::tJ"l3 rL r Jl si*-{*i, lli .11.
.{6-:l
^ '1,',/
ffit$o'\n'
t| ts?b fyrFdng Estedbt{ns{rt- trl"15 Noitdth lndudnrlArea. Aht Ofirt*, ,JAE fal- -9?1- l5$$ 0163^ Frr" *$21.2 iS3 BSS,Enlrd. info*Sa$b.{S!, Wfi $t€ *y1r.*arab.ff{rn
.97t 15550163.Xt+.-i.r--i"i;?ri;!r*--*I!.U-1S.i_itj.-g!_;;ii{.:;..*-!r2.,i*,.-ie..:,i;r.}ra**+,;rJii.*:-n*ufalrs*.60fl1. tJp.lr Far + Si't- i SS3 $8tr,€n#r. n@$*t*.*srl,
Eln-rl;lt ;r-bt r Lb;ffi;*--* &nrffi rATIL- I(NR INFRA$TRUCTURE pvr. LTD. ffi
Date: Ogth March, 2013
TO- WTIOM9O.FJFR IT MAY CON.€IRN
It it certify that Mr. Sujeet Kurnar was employed with us during 05th January l0o9 to 28th February
2013, as a BrHte frlginecr, for Widening and Strengthening of existing 2 lane to 4 lane Flexible
Pavement from AP/ Karnataka Border to Avathi VillaBg from Km i163.60 :o Km 524,00 Section of NH-
7 in Karnataka (Package No. C-11lA9lon 8OT{Annuity} basis.
He was sincete and wisies him all success in his life.
S',/rlb-zi \ D'
'Sriprdlro', No- l03lJtl, 9tl 'B Cronn ludicid l,ryort GKVK Port Blngdor+ 56{X165
Phoro. +91{145O{5t?. Frr. +91{ll-l855at{0
&nter"ffi #stti n e mtml ffi q) ns n* l€m nrtsand Techffi*srmtw Fwt" Lec{"
Date:30u'December,2008
TO WHOMSOEVER IT MAY CONCERN
It is to certify that Mr. Sujeet Kumar, s/o- Sri Kapildeo Narayan Singh had served in this organization
since January 2004 to December 2008 in a capacig of Assistant Manager for Rehabilitation and mainlenance ofpackage (M-8) project in state of Kamataka.
He has shown achieving targets of works, honesty and sincerity,
Wish him prosperous life in future.
For ICT Pvt. Ltd"
\o*-\P-{S.. K. I{hetarpal)iVfanag*r {Fers.} r'/*tK.,
/ \v.'v'
6:txxx$$rt a-rr. a*:rr I,iP; Fa'k J A€ i i,ltw 0elhi J s
Wv#
T.THtrEals; ?€[12&ffi
TO W*roil ff tfrAY COl'lSERi'l
Mr" Sulo+t Xurnrr has *qrked udth r*s as a &idfiE fngin*er from Marcb 20S0 t* Secfffibor3003 on Mumb*i* ftrna Exprwnriay {$sdtsn B}from ChocktoAdhpii $etiioc ir{ah*rg3htr*,Ha he* p*dorced hi; dt*ia* v*ly pwf**eiEnally, coneciousry ard rrfth horetty,
|l* j* hrrdurprking- puffiiil atrd hao *xlengire srperisrwt of frigtrrray cpnsfirug*nn ryrd lra*beaa*oilEc'?|4$nry marnber of cofistruction leaft.
W* *ish hlm all thc b+*t in lis fduru.
tk**/$:'
Thanhirg you
Gol,ProidSoordimlsr
l{ndu*lnn 0on*f uctiEn Cqrnpany
Haa{srlr'l Cntrdrt Gercf, tfd"t{nryt t{orfir. *17 pr.r, Lss rjbt, Mr*nsf; {W}, lldl* - {em, rr?.rt c4.rtailt q0fifi&atl.rsm
T#, **1 &n#r$ $(n ftr rft itlS??$ffi
r*#d. EltlE : r. to-Of.Arqlirggs ,r,e{r, t{rcM C!&dlgtu * , {f l {O:, lsr* t{#$, !* 4 r . rfil1!" !"$tl.t&tma* : lrlroea'n*rrlloor*$*,{lp*no*"coc
TS WlfpM tT,JlrAY CqryCafin
ltis i* ir: crnili thai $lri titje*t l(rmr. ynn of Shri lts$il llm f'larayanliingh hffi '*nrfscd lrith us with sur *cs{xinft crganiaalion from s,ugurt fgryz w F'*braarx,
1000 * a fidf Erg*nmr {lilrurtilrefi} fur the projncr ;d fnnstru{:rin* and Hnginssrtnl$upenr.isiun of Moj+r xighway Sridge of lxngdr- es?,sm ar ll**rb*y. bldsrarhira; spul6$'0mts nnd trtro ebutrffint of 56-tlmtE e*ch Arr*ngernenr*" constructir,n of pe,nr nifi tr*ariogP?"fE : wcll lbusrd*rion tl4 on r*'nt*r arxl r*r etrrilftsnl N*'si; liurr:r*uucr*n- po*rlr:rsitlnsd ca** in ruit ginl+r'
llc w$$ sindcre and wi*hcs lrinn sll su{fs$*.
'llranliag you.
l:br tflhr Csnstructiunr
\Itlrrtsi{\-r',\b.
JO8Engineering
LirnitedJA&€r*6rr{F$fi*tc LrsrEFi -Jo*tfxrrtr." llfr, rfrrd;rr*, tr**s&4r'|r For4gunr{t1oot, Ftsl. r {1, 10.
<{'glt, f|l : 'ft- t9.lff14t{S. G{}*t i ,rlxfirafi*f||,reefcfrrJ
3lrl ',t$y | $97
TO WHOilr $O EVSR -fT itAy col{cf.Rr,{
Thti is to csrl#y lhal Ml Suloel XurnEr ha$ iyorl4s rn thrr cornpany einos 10{tr c}ctoo8r. lggtto 3t${ Jtdy, 19f} ln a c*pacr$ nf ErEineer {Sivfi} for cofigrudiorr of Trro }tErr g{i{tga3 crlP*lara geldl lfarg {$* L:nE vvi*r d*.rat r€rrngsii ry} *t uedi Mumbai, lf;*harasrlra,
lia h*s thffin exf8lbfil pgfirnn*ne on *cf*ievirry tirngly cornglEtion of assqnad isd(thror8l hi* hard*or,kinE. h€n**tf, FurHugti{y *nd span di*cr*ssrom $uring hi* tgrane.
Company *i*he* han exca,lbnt tirne ir* r*st af hs fstilre
, t'lesiT-ub.(t\"'