DETAILS OF WORKS FOR HIGHWAYS
21. HIGHWAYS AND MINOR PORTS DEPARTMENT
tuÎtuÎtuÎtuÎ-bryΤ £l btëpLbryΤ £l btëpLbryΤ £l btëpLbryΤ £l btëpL
59 BUDGET PUBLICATION
Ïil¡fhy tuÎ-bryΤ £l«
INTERIM BUDGET
2021-2022
DETAILS OF WORKS FOR HIGHWAYS
DEMAND No.21 DEMAND No.21 DEMAND No.21 DEMAND No.21 ---- HIGHWAYS HIGHWAYS HIGHWAYS HIGHWAYS AND MINOR PORTS AND MINOR PORTS AND MINOR PORTS AND MINOR PORTS DEPARTMENTDEPARTMENTDEPARTMENTDEPARTMENT
HEADS OF DEPARTMENT Page
Number
21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1—35
21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 36—193
21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 194—244
21 05. PROJECT DIRECTOR - TAMIL NADU ROAD SECTOR PROJECT
21 06. HIGHWAYS RESEARCH STATION
245—249
250—250
21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD AND RURAL ROADS
251—305
21 10. CHIEF ENGINEER (METRO) 306—314
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
01 National Highways
337 Road Works
JA Original works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 01 337 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 01 337 JA 16 00( DPC )
1160001. AS / TS / RAS:
11,60,00 ... ... 11,59,42 58
G.O.(MS).No 100 Highways and Minor ports (HV2) Department dated 06.08.2020
1800002. AS / TS / RAS:
18,00,00 ... 18,00,00 6,40,58 11,59,42
G.O.(MS).No 28 Highways and Minor ports (HV2) Department dated 04.03.2019
64 Lands 5054 01 337 JA 64 09( DPC )
1. AS / TS / RAS:
... ... 1 1 1
29,60,00 ... 18,00,01 18,00,01 11,60,015054 01 337 JATOTAL -
1
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
01 National Highways
337 Road Works
JC Providing Sand Fencing along seashore at Dhanushkodi in NH 49 (Madurai – Dhanushkodi Road) - Scheme under State Innovation
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 01 337 JC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 01 337 JC 16 06( DPC )
10001. AS / TS / RAS:
10,00 2,00 ... 8,00 ...
Providing Sand Fencing along Sea shore at Dhanushkodi in NH 49 (Madurai - Dhanushkodi road). G.O.(MS).No 12 Highways and Minor ports (HN1) Department dated 24.01.2020
10,00 2,00 ... 8,00 ...5054 01 337 JCTOTAL -
2
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening from IL to DL and Improvements to Karanodai - Meenchur road from km 0/0-8/2
1200001.
Chennai (NH)Division
AS / TS / RAS:
11,90,00 7,27,45 6,74,66 49,59 4,12,96
CRF-TN-2017-18-100
Widening of Walajabad - Sunguvachatram - Keelachery road (Double Lane to Four Lane) from Km 0/0-19/6
11100002. AS / TS / RAS:
121,65,00 13,61,61 35,00,00 100,00,00 21,35,89
CRF-TN-2018-19-01
Widening from SL-IL and Improvements to Melanur-Meiyur road Km 0/0-10/0
800003. AS / TS / RAS:
8,57,00 6,40,32 1,41,87 1,48,42 68,26
CRF-TN-2017-18-140
Widening from SL-IL and Strengthening perumbare-orathy road km 0/0-10/2 inculding reconstruction culvert 30 nos and reconstruction of minor bridge km 0/6
1000004. AS / TS / RAS:
11,00,00 9,40,38 92,95 1,50,00 9,62
CRF-TN-2017-18-101
Widening of Guduvanchery - Kottayur road from Km 0/0 - 17/6 (Double Lane to Four Lane)Lane)Lane)
7000005. AS / TS / RAS:
76,87,51 14,36,93 30,00,00 60,01,99 4,64,00
CRF-TN-2018-19-05
Widening of Chengalpattu - Thiruporur road from Km 0/0 - 21/8 (Double Lane to Four Lane)Lane)
14000006. AS / TS / RAS:
126,75,00 41,28,85 35,00,00 83,00,00 11,35,00
CRF-TN-2018-19-04
Widening of Kodampakkam - Sriperumpudur Road Km 13/2 - 28/8 (Double Lane to Four Lane)
12000007. AS / TS / RAS:
132,00,00 23,07,07 38,00,00 102,00,00 30,99,00
CRF-TN-2018-19-03
3
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening of Elichur - Palur Road from Km 0/0 - 8/6 (single road to intermediate lane)
3800008.
Chennai (NH)Division
AS / TS / RAS:
41,80,00 7,05,87 15,00,00 31,00,00 3,74,13
CRF-TN-2018-19-02
Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road
937409. AS / TS / RAS:
10,31,00 8,20,96 1,14,92 2,10,00 4
CRF-TN-2017-18-26
Construction of Bridge at km 44/8 of Thirumazhisai- Uthukkottai Road
27891010. AS / TS / RAS:
30,67,00 17,83,97 14,67,21 9,40,00 3,43,03
CRF-TN-2017-18-41
Widening from Single lane to Intermediate lane and Improvements from km 0/0-4/0 & Improvements from km 4/0 - 7/4 of Kumaratchi-Puliyangudy road including Construction of Retaining Wall
8500011.
Vellore (NH) Division
AS / TS / RAS:
9,00,00 5,65,26 2,28,65 3,34,70 4
CRF-TN-2017-18-102
Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 10/0-17/0 and 18/2-26/6 Strengthening at km 17/0-18/2 including CD works. (SH-171)
23000012. AS / TS / RAS:
24,15,00 2,25,29 10,00,00 21,89,70 1
CRF-TN-2018-19-21
"Widening from IL to DL & Improvements from Km.2/4-15/8 including construction of minor bridge at km.13/2, CD works & retaining wall at Km.9/6-10/230 (L/s) and junction improvements of Melpattampakkam-
Panchamadevi road (via) Madukkarai(MD-1114)"
14000013. AS / TS / RAS:
14,08,00 7,41,44 7,58,00 6,66,50 6
CRF-TN-2018-19-20
Widening from Single Lane to Intermediate lane and Improvements of Odiyandhal - Kallipadi Road at Km.0/0-10/8 and including Reconstruction of culverts.
10000014. AS / TS / RAS:
10,54,00 8,98,33 1,54,00 1,55,67 1
CRF-TN-2018-19-26
4
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Wdg to SL to IL and Stg. From Km. 0/0-15/0 of Pagandai - X road to Mamandhur road
10500015.
Vellore (NH) Division
AS / TS / RAS:
10,50,00 7,01,79 2,45,01 3,21,00 27,21
CRF-TN-2017-18 -12
Widening from Single lane to Intermediate lane and Improvements of Indili - Sembakurichi road (via) Pukkiravari road at km 19/0-27/510.
6100016. AS / TS / RAS:
6,70,00 4,24,66 1,70,00 2,45,30 4
CRF-TN-2018-19-25
Widening from DL-ML and Improvements of Vridhachalam-Tholudur road at km 32/0-42/0 including CD works. (SH-171)
17000017. AS / TS / RAS:
17,72,00 3,52,20 9,00,80 14,19,77 3
CRF-TN-2018-19-22
Widening from IL to DL and Improvements to AlanKuppam To Konerikuppam via Avanipur Km 4/0-21/0 including CD works.
10000018. AS / TS / RAS:
11,00,00 9,28,58 1,00,00 1,71,40 2
CRF-TN-2018-19-24
Widening from Intermediate lane to Double Lane in Km.6/0-10/170 & 11/220-20/2, Widening from Single lane to Double Lane in Km.10/170 - 11/220 and Strengthening of Thiyagadurgam - Adari Road
12500019. AS / TS / RAS:
13,74,00 6,47,58 6,54,00 7,26,40 2
CRF-TN-2018-19-23
Widening and Strengthening from Km 10/2-13/0, 32/4-33/4,40/0-42/4, including CD works of Vellimedupettai- Pondy Road via Mailam
12500020. AS / TS / RAS:
12,77,00 10,21,88 1,77,00 2,55,10 2
CRF-TN-2018-19-27
Widening from SL - IL and Strengthening km.0/0 - 11/0 of Thiyagadurgam - Pudhukeni Road.
9000021. AS / TS / RAS:
9,00,00 5,85,02 2,16,28 3,14,90 8
CRF-TN-2017-18-64
5
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening from DL-ML and Strengthening of Thirukoilur-Asanur Road km 29/100-35/7
9500022.
Vellore (NH) Division
AS / TS / RAS:
9,90,00 7,65,13 3,23,74 2,23,07 1,80
CRF-TN-2017-18-103
Widening from DL to ML and Strengthening from km 30/7 - 40/4 of Virudachalam - Ulundurpettai - Villupuram road.
13000023. AS / TS / RAS:
14,15,00 13,17,18 46,91 56,77 41,05
CRF-TN-2017-18-104
Improvements to Thittagudi-Sirupakkam road (via) Avatti.,Ma.Pudaiyur km 11/0-18/0 (Except cement road km 16/700-17/100)
6650024. AS / TS / RAS:
7,10,00 6,11,34 89,00 98,60 7
CRF-TN-2017-18-105
Improvements to Kumaragudi-Nachiyarpettai road km 1/0-10/0 including Construction of Retaining Wall
6000025. AS / TS / RAS:
6,00,00 5,78,71 2,14,10 21,20 9
CRF-TN-2017-18-106
Strengtheneing to Senganankollai-Thathanur road from km 0/0-10/8
4100026. AS / TS / RAS:
4,50,00 4,27,31 3,32 19,17 3,52
CRF-TN-2017-18-107
Widening from SL to IL and Strengthening from km 9/5 - 16/6 of Nattarmangalam - Thondur Road including CD works
5500027. AS / TS / RAS:
5,94,00 5,60,13 16,40 22,95 10,92
CRF-TN-2017-18-143
Widening from Km 21/6 - 48/2 including strengthening from km 21/6-25/550, 30/2 -31/2, 35/6 -39/6 and 44/6 -48/2 including CD Works of Vellemedupettai- Pondy road (via) Mailam
20000028. AS / TS / RAS:
21,92,00 21,72,70 3,84,07 19,22 8
CRF-TN-2017-18-149
6
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening and Strengthening from km 28/0-32/0 of Vridhachalam - Thozhudur road.
9000029.
Vellore (NH) Division
AS / TS / RAS:
9,00,00 1,06,30 7,15,07 7,93,69 1
CRF-TN-2017-18-135
Widening from SL to IL and Strengthening of Kachirapalayam - Pottiyam Road Km.0/0 - 8/8
6400030. AS / TS / RAS:
6,40,00 4,55,04 86,46 1,84,90 6
CRF-TN-2017-18-63
Widening IL to DL and Strengthening of Ayal Anwarthikhanpet Road (M794) Km0/0-11/8
11000031.
Salem (NH) Division
AS / TS / RAS:
9,50,13 8,76,61 1,00,13 20,00 53,52
CRF-TN-2018-19-15
Widening DL to three Lane and Strengthening of Sholinghur Kaveripakkam Road (SH 128) Km 6/4 -8/4, 17/150-20/030, 20/830-26/4 and Strengthening of ROB Approaches and service Road at Km 12/0-12/8
15000032. AS / TS / RAS:
15,26,00 14,18,33 1,26,00 49,99 57,68
CRF-TN-2018-19-14
Improvements of Abdullapuram – Asanampattu -Alangayam -Tirupattur Road at Km 22/500 - 25/8, 28/4 - 30/0, 48/4 - 56/0 & 64/0 - 65/0 with paved shoulder (SH 122)
17500033. AS / TS / RAS:
19,21,00 13,03,62 7,23,00 6,17,38 ...
CRF-TN-2018-19-19
Widening from Double Lane to Multi Lane and Improvements of Tirupattur - Singarapet Road at Km 1/0 - 7/0 including reconstruction of Bridge at Km 2/4
13000034. AS / TS / RAS:
14,12,00 4,75,06 7,00,00 9,36,90 4
CRF-TN-2018-19-18
Widening and Improvements of Polur Jamunamarathur- Alangayam –Vaniyambadi Road at Km 54/6 - 62/0 (Forest), 62/0 - 63/0, 76/2 - 76/6, 76/10, 77/0 - 78/0, 78/0 - 79/4 & 81/0 - 81/6 with paved shoulder (SH 215)
13500035. AS / TS / RAS:
14,20,00 1,58,36 8,00,00 12,31,64 ...
CRF-TN-2018-19-16
7
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening IL to DL from km 0/0 - 10/4 & SL to DL from km 10/4 - 12/4 and Improvements Km 0/0 - 12/4 of Walajah Valluvambakkam Mahanipattu Road including reconstruction of culverts & construction of minor bridges
18500036.
Salem (NH) Division
AS / TS / RAS:
18,00,00 16,37,94 1,39,24 28,78 1,33,28
CRF-TN-2017-18-97
Widening and Improvements of Ambur - Sathgur Road at km 3/0 - 8/0
7000037. AS / TS / RAS:
7,60,00 2,12,29 4,50,00 5,47,71 ...
CRF-TN-2018-19-17
Widening from IL to DL and Improvements to Km 0/0-2/0 & 7/8-10/6 of Patchur - Kothur Road to A.P. Border Road
3395038. AS / TS / RAS:
3,67,23 3,50,97 1 1 16,25
CRF-TN-2017-18-43
Strengthening to Arcot-Tindivanam Road to Embalam Road at km 0/0 to 2/2 and 2/6 - 3/6
2200039. AS / TS / RAS:
2,31,00 2,15,51 1 1 15,48
CRF-TN-2017-18-95
Widening from SL to IL and Improvements to Thenkarimbalur - Kottaiyur - Valavachanur km 0/0-6/0.
4800040. AS / TS / RAS:
5,20,00 4,95,09 18,86 9,74 15,17
CRF-TN-2017-18-96
Improvements of Madhanur - Agaram Road at Km 0/0 - 9/6
7300041. AS / TS / RAS:
7,25,00 6,34,13 64,42 40,00 50,87
CRF-TN-2017-18-99
Strengthening in Arcot-Tindivanam Road from Km 45/4-47/0 and Km 53/0-54/8.
3860042. AS / TS / RAS:
3,70,00 3,54,65 1 1 15,34
CRF-TN-2017-18-136
8
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening from SL to DL and Improvements to Verayur - Thalayampallam Road km 0/0-8/5.
8020043.
Salem (NH) Division
AS / TS / RAS:
8,30,00 7,80,62 42,84 10,00 39,38
CRF-TN-2017-18-137
Widening from SL to IL and Improvements to Agaram - Porkunam Arpakkam Road km 0/0-3/0 & 6/0-11/0
6000044. AS / TS / RAS:
6,27,00 5,78,42 29,99 1 48,57
CRF-TN-2017-18-138
Widening IL to DL and Improvements of Muppaduvetti Kaniyanur Road, Km 0/0 - 11/6 including reconstruction of culverts and construction of minor bridge.
13000045. AS / TS / RAS:
14,10,00 12,42,46 1,42,84 29,91 1,37,63
CRF-TN-2017-18-139
Improvements to Arcot-Tindivanam Road Km 21/6-23/4 and Km 48/0-50/0 and reconstruction of Minor bridge at Km 48/6
5820046. AS / TS / RAS:
5,64,00 4,95,07 35,64 37,85 31,08
CRF-TN-2017-18-94
Improvement of Gudiyattam- Gadambur- Kailasagiri - Vaniyambadi Road Km.22/570- 30/4 & 37/6 - 42/0
10700047. AS / TS / RAS:
10,25,00 9,45,68 1 1 79,31
CRF-TN-2016-17-116
Improvements to Km 30/0-34/0, 46/6-48/4 & 56/0-64/0 of Abdullapuram - Asanampattu - Alangayam - Tirupattur road.
10000048. AS / TS / RAS:
9,97,00 9,64,60 1 1 32,39
CRF-TN-2017-18-23
Improvements for curves at km 3/6 Realignment of Tank Bund Portion at km 13/6 of Tirupattur - Singarapet Road
1000049. AS / TS / RAS:
1,02,40 95,19 1 1 7,20
CRF-TN-2016-17-122
9
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Strengthening from Km 11/0 - 19/8 & Improvements to Km 11/0 - 19/8 of Arcot-Tidivanam Road
10630050.
Salem (NH) Division
AS / TS / RAS:
10,74,00 10,58,04 1 1 15,95
CRF-TN-2017-18-25
Improvements of Abdullapuram-Asanampattur-Alangayam-Tirupattur road Km 65/0-71/6
6000051. AS / TS / RAS:
6,20,00 6,18,38 1 1 1,61
CRF-TN-2016-17-85
Widening from IL to DL and Improvements of Guruvarajapalayam - Odugathur - Melarasampattu Road at km 0/0 - 9/0
10050052. AS / TS / RAS:
8,50,00 7,88,27 39,95 10,00 51,73
CRF-TN-2017-18-98
Widening from SL to DL and Improvements to Km 2/0 - 8/0 of Jaffrabad - Velathigamanibenda Road
5005053. AS / TS / RAS:
5,04,26 4,48,04 1 1 56,21
CRF-TN-2017-18-42
8500054.
Coimbatore (NH)Division
AS / TS / RAS:
8,50,00 7,87,46 6,20,47 ... ...
Widening IL to DL I Km 13/0 to 17/0 and 17/150 - 222/0 and strengthening of Km 13/0 - 22/0 of
Widening from DL to FL from Km 0/0-2/4 of Harur Bypass
7240055. AS / TS / RAS:
7,90,00 6,91,34 10,00 82,11 16,55
CRF-TN-2018-19-40
Reconstruction of High Level Bridge at Km.0/6 of Salem - Ulundurpet Road to Ammampalayam Narikuravar Colonny Road (OSA209) across Vasista River
5000056. AS / TS / RAS:
5,50,00 2,36,22 2,28,22 3,13,70 8
CRF-TN-2018-19-63
10
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Reconstruction of Bridge @ km 0/6 including widening and strengthening from km 0/0-1/0 of Solakadu - Thinnanur road to Valavanthi - Sellippatti road (via) Sakkaraipatti & Sithuruvi Road inculuding Protective wall.
5000057.
Coimbatore (NH)Division
AS / TS / RAS:
5,50,00 4,78 4,68,01 5,45,20 2
CRF-TN-2018-19-64
Construction of high level bridge at km 43/10 of Ayothiyapattinam- Belur - kilakkadu road
3500058. AS / TS / RAS:
3,23,00 1,83,33 80,60 1,39,60 7
CRF-TN-2018-19-66
Construction of flyover at Km 0/2 of Magudanchevadi - Kumarapalayam (via) Edappady road(NH 47 Junction at Km 19/6 )
45000059. AS / TS / RAS:
45,00,00 9,82,70 33,06,97 33,63,59 2,44,96
CRF-TN-2017-18-52
Construction of flyover at Km 203/2 of NH 44
30000060. AS / TS / RAS:
33,00,50 14,95,80 12,99,20 18,03,03 1,67
CRF-TN-2018-19-69
Widening from SL to IL and Improvements in km 13/700-22/200 of Kadayampatti to sandaipettai to Thatravoar Ramamoorthy Nagar road including CD works and protective works
8000061. AS / TS / RAS:
8,00,00 7,64,39 2,52,60 1 35,60
CRF-TN-2017-18-129
Widening from IL- DL in km 13/0-17/0 & 17/150-22/0 and Strenthening in Km 13/0-22/0 of Gajalnaickanpatty-Panamarathupatti-Sechansavadi road including widening of CD works and constuction of Protective works
8500062. AS / TS / RAS:
8,50,00 7,87,46 8,50,00 62,50 4
CRF-TN-2017-18-130
Construction of flyover at Km 32/4 of Thiruchengodu - Ariyanoor road (NH 47 Junction at Km 8/6)
45000063. AS / TS / RAS:
46,97,25 12,16,43 30,60,21 32,81,90 1,67
CRF-TN-2017-18-51
11
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening and Strengthening of I L to DL at km 0/0-2/8 of Vadugapatty - Alanganatham road (M1178) , Construction of Retainingwall at Km 2/4 - 2/8 and including Construction of bridge at km 2/2-4 in Lieu of Existing Bed level causeway.
8000064.
Coimbatore (NH)Division
AS / TS / RAS:
7,51,00 5,82,71 1,00 1,57,58 10,71
CRF-TN-2017-18-61
Widening SL- DL in Km 1/2-1/8, 4/0-7/6 and Widening & Strengthening from SL to DL in Km.0/6-1/2 and 1/8-4/0 of Pochampalli- Kallavi Road including CD Works
5000065. AS / TS / RAS:
5,00,00 4,82,07 7,53 1 17,92
CRF-TN-2017-18-62
Widening from SL to IL and Improvments in km 6/0-17/4 of Sapp[anapatty to Panandur to Bandarahalli road inculding CD works and protective works
8000066. AS / TS / RAS:
8,65,00 8,40,76 28,64 1 24,23
CRF-TN-2017-18-65
Construction of high level bridge atKm 5/10 of Puluthikuttai - Santhumalai road.
3500067. AS / TS / RAS:
3,32,00 53,00 2,21,50 2,70,00 9,00
CRF-TN-2018-19-67
Widening from SL to IL & Strengtheningn in Km 0/0-10/4 of Chinnabargur - Kanamoor road including CD works
10500068. AS / TS / RAS:
11,14,50 9,94,07 1,14,50 1,20,40 3
CRF-TN-2018-19-38
"Widening from SL to IL and Improvements at Km 5/6 - 11/6 of Vallipuram-Palapatty road (including CD Works)"
4000069. AS / TS / RAS:
4,15,88 3,79,05 7,82 36,81 2
CRF-TN-2018-19-35
Widening and Improvements from Two lane to four lane at Km 48/4-55/4 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including CD works, Minor Bridges, Construction of Drains & Retaining wall at KM 48/8-49/4) (SH 60)
25000070. AS / TS / RAS:
25,68,00 4,10,12 8,00,00 11,57,80 10,00,08
CRF-TN-2018-19-37
12
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening from SL to IL & Strengthening of Denkanikottai- Madhagondapalli Road Km 0/0-11/2 including CD Works and Protective Works .
12650071.
Coimbatore (NH)Division
AS / TS / RAS:
13,19,50 11,59,42 1,18,38 1,58,97 1,11
CRF-TN-2018-19-39
Widening and Improvements from Two lane to four lane at Km 40/6-45/2, 46/8-48/0 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including CD works (SH 60).
18000072. AS / TS / RAS:
18,95,80 6,37,85 8,00,00 10,45,77 2,12,18
CRF-TN-2018-19-36
Widening and Improvements to Km 0/0 - 2/8 Including Construction of High level Bridge at Km 1/2 of Km 173/10 of Salem Cochin Road to Ettimadai Railway Station Road
5000073.
Madurai(NH) Division
AS / TS / RAS:
5,00,00 4,41,05 58,95 1 58,94
CRF-TN-2016-17-88
Rebuilding the road from Km 11/100-17/450 of Hellan -Yellamalai-Periyasholai Road
5700074. AS / TS / RAS:
5,34,70 5,30,26 1 1 4,43
CRF-TN-2017-18-31
Widening to doublelane with hard shoulders of the road from km 122/0 of Dindugal - Bangalore road to Nadupuni km 0/0 - 17/4
22500075. AS / TS / RAS:
22,50,00 19,75,51 2,00,00 50,00 2,24,49
CRF-TN-2018-19-48
Widening from SL to IL and improvements to Km.7/0-9/350 of Seripalayam-Thamaraikulam road
2970076. AS / TS / RAS:
2,97,00 2,33,00 1 1 63,99
CRF-TN-2016-17-95
Widening from DL to FL including improvements in Km 7/4-16/0 of Tiruppur - Kangeyam road (SH -172)
17000077. AS / TS / RAS:
18,68,00 15,27,91 3,40,08 2,03,08 1,37,01
CRF-TN-2018-19-42
13
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Construction of High level Bridge at Km 14/8 of Kamanaickenpalayam - Negamam - Chettipalayam road
1480078.
Madurai(NH) Division
AS / TS / RAS:
1,48,00 1,30,30 1 1 17,69
CRF-TN-2016-17-125
Construction of Fly Over including Beautification and Junction Improvements from Km 340/0-343/6 of NH 67 (Nagapattinam – Gudalur – Mysore Road - Ramanthapuram Junction & Sungam Junction in Coimbatore City)
230000079. AS / TS / RAS:
230,00,00 45,26,17 89,36,31 136,12,67 48,61,16
CRF-TN-2018-19-6
Widening DL - FL at km 4/0 -15/8 of Pollachi - Palakkad Road (SH-784)
70000080. AS / TS / RAS:
70,00,00 ... 30,00,00 ... 70,00,00
CRF - TN - 2018 - 19 - 71
Improvement to Km 0/0-23/2 of Velliangadu - Pegumbellah including CD works
30000081. AS / TS / RAS:
23,87,07 8,52,31 8,00,00 13,54,78 1,79,98
CRF-TN-2018-19-47
Improvements to Km 0/0 - 10/0 of Udhagai Kothagiri Mettupalayam Sathy Gobi Erode road including CD works & Protective works
10890082. AS / TS / RAS:
10,89,00 9,93,64 1 1 95,35
CRF-TN-2016-17-89
Widening from Single lane to Double lane including Construction of Minor Bridge at km 0/6 Construction of Culverts , Retaining Wall , Dip Raising and improvements of Mettupalayam - Kitchagathur road (via) Moolathurai at Km 0/0 - 13/250 .
20000083. AS / TS / RAS:
18,17,19 11,30,13 5,00,00 4,29,76 2,57,30
CRF-TN-2018-19-45
Widening from Double Lane to Three Lane at Km 33/0 - 40/0 of Avinashi - Tirupur - Palladam - Pollachi - Cochin (Via) Meenkarai Road (SH 19)
10000084. AS / TS / RAS:
11,00,00 8,80,04 2,00,00 98,12 1,21,84
CRF-TN-2018-19-41
14
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Construction of Fly Over including Beautification and Junction Improvements from km 352/320-352/990 of NH 67 (Nagapattinam – Gudalur – Mysore Road - GN MILLS Junction in Coimbatore city ) (including LA)
50000085.
Madurai(NH) Division
AS / TS / RAS:
40,00,00 17,85 20,00,00 25,95,20 13,86,95
CRF-TN-2018-19 - 08
Construction of Fly Over including Beautification and Junction Improvements from km350/560-351/560 of NH 67 (Nagapattinam – Gudalur – Mysore Road - Goundampalayam Junction in Coimbatore city)(including LA)
60000086. AS / TS / RAS:
64,00,00 7,76,28 27,00,00 44,59,97 11,63,75
CRF-TN-2018-19-7
Widening from SL to DL and Improvements from Km 0/0 - 5/4 of Irumborai - M.Goundampalayam Road.
5500087. AS / TS / RAS:
5,32,00 4,61,91 70,10 26,94 43,15
CRF-TN-2017-18-82
Widening and Improvements of Km 9/4 of Coimbatore - Siruvani Road to Theethipalayam Road at Km 0/0 - 2/4.
1800088. AS / TS / RAS:
1,80,00 1,56,41 1 1 23,58
CRF-TN-2017-18-84
Widening from Single lane to Intermediate lane including widening culverts, Retaining wall, Dip Raising and improvements of Athipalayam - Vellamadai road at km 0/0 - 5/08.
6000089. AS / TS / RAS:
6,55,39 5,76,98 78,41 1 78,40
CRF-TN-2018-19-46
Strengthening in km 4/6 - 11/2 of Saravanampatti - Thennampalayam Road. (MDR - 678).
3500090. AS / TS / RAS:
3,63,00 3,30,35 1 1 32,64
CRF-TN-2017-18-132
Widening from SL to IL and Improvements to Km 0/0 - 4/4 of Kothumudi - Ebbanadu Road.
4740091. AS / TS / RAS:
4,74,00 4,56,31 1 1 17,68
CRF -TN-2017-18-30
15
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening and Improvements of Km 8/0 of Coimbatore - Siruvani Road to Theethipalayam Road (via) Patchapalayam Road at Km 0/0 - 2/6.
2000092.
Madurai(NH) Division
AS / TS / RAS:
2,00,00 1,83,94 1 1 16,05
CRF-TN-2017-18-85
Widening and Improvements from Intermediate Lane to Double Lane at Km 16/0-32/4 of Anaimalai-Poolankinar Road
11500093. AS / TS / RAS:
11,25,00 7,55,30 3,69,70 2,58,44 1,11,26
CRF-TN-2017-18-83
Widening from SL to DL and Improvements from Km 0/0 - 7/8 of Mettupalayam to K.Pungampalayam road via Kurunthamalai.
7400094. AS / TS / RAS:
7,40,00 6,65,07 74,93 20,58 54,35
CRF-TN-2017-18-81
Widening Form Km 62/6-74/650 Erode - Dharapuram Road
12930095. AS / TS / RAS:
12,93,00 10,98,12 1,94,88 1,30,33 64,55
CRF-TN-2017-18-79
Widening and Improvements from 20/0-26/4 of Tiruppur-Kangeyam Road
10301896. AS / TS / RAS:
10,30,18 9,32,64 1 1 97,53
CRF-TN-2016-17-123
Widening from SL to DL and Improvements to Km 0/0 - 12/0 of branching road from Km 58/6 of Erode - Karur Road and join in Km 282/6 & NH 7 (Via.) Attor - Moorthypalayam - Nanaparappu Road including construction of CD works
8720097. AS / TS / RAS:
8,99,40 8,32,63 1 1 66,76
CRF-TN-2017-18-32
Widening from SL to IL In Km 0/0-4/6 and Improvements to Km 0/0-3/8 Velliyankadu - Athimathayanur road
3540098. AS / TS / RAS:
3,54,00 3,03,83 50,16 1 50,16
CRF-TN-2016-17-94
16
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
New works likely to be sanctioned
099.
Madurai(NH) Division
AS / TS / RAS:
... ... ... ... 109,62,62
CRF-TN
Widening and improvements from Km 0-0-6/6 of Aravenu Hallakarai road including protective and CD works
70000100.
Thanjavur (NH) Division
AS / TS / RAS:
7,58,86 6,45,93 1,12,93 90,00 22,93
CRF-TN-2018-19-51
50000101. AS / TS / RAS:
3,58,00 3,22,57 46,33 ... ...
Widening and Improvements at Km 4/0 - 7/0 of Butter-combai Kappachi (via) Thummanatty Road
200000102. AS / TS / RAS:
9,90,00 8,92,49 97,51 ... ...
Widening and Improvements from Single Lane to Intermediate lane from Km 1/0-10/0 of Nellakottai - Devala Road including CD works and Protective works
Widening from Km 0/0 - 11/0 and Improvements in Km 0/0 - 3/0, 6/6 - 9/0, 10/0 - 11/0 and Widening of Bridge at Km 9/4 of Anthiyur - Ammapet Road.
99920103. AS / TS / RAS:
10,74 10,34,69 40,21 ... ...
45000104. AS / TS / RAS:
4,42,00 3,50,69 61,31 ... ...
Improvements to Km 0/0 - 7/2 of Gudalur O'valley Road
35000105. AS / TS / RAS:
3,26,00 2,88,94 29,07 ... ...
Improvements to Km 2/0 - 4/8 & Providing CC drain & Protective wall from Km 0/0 - 2/0 of Kookalthurai Road
17
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
195000106.
Thanjavur (NH) Division
AS / TS / RAS:
21,10,00 20,29,15 71,08 ... ...
Widening from Km 19/2 -24/4, 24/8-31/8 & 33/0-37/0 and Improvements in Km 19/2-20/4, 23/0-24/4, 24/8-31/8 and Km 33/0-37/0 of Erode - Perundurai - Kangeyam Road (SH-96)
Widening SL to IL and Improvements of K.Metupalayam - Kosanam - Thitamalai road at km 0/0 - 6/8 including CD works
100000107. AS / TS / RAS:
10,00,00 ... ... ... 10,00,00
CRF-TN-2018-19-71
Providing road safety measures from Km 14/0-21/0 of Udagai-Avalanchi-Kundha-Thai sola road
100000108. AS / TS / RAS:
10,72,34 8,98,70 1,68,41 1,59,83 13,81
CRF-TN-2018-19-61
Improvement to Km 0/0-22/0 of Kundha - Pegumbellah road including CD works and hair pin bend iprovement (43 Nos.)
250000109. AS / TS / RAS:
26,99,00 8,36,81 8,00,00 18,63,05 86
CRF-TN-2018-19-50
Widening from DL to ML and Improvements of Gobi - Uthukuli - Padiyur road (SH-81) at km 3/0 - 11/8, 12/4 - 13/6 and 14/2 - 16/8 including geomentrical improvements and construction of minor bridge at km 4/6.
150000110. AS / TS / RAS:
16,48,00 15,63,98 1,53,25 7,00 14,02
CRF-TN-2018-19-49
Widening DL to ML and Improvements to Km 11/0-17/4 and Improvements to km 12/0 - 12/8 of Anthiyur - Ammapettai road (MD 28)
100000111. AS / TS / RAS:
9,06,50 3,51,98 5,77,95 5,30,00 24,52
CRF-TN-2018-19-44
Widneing from Two lane to Three lane and Improvements in Km 0/0-15/0 of Bhavani - Anthiyur - Chellampalayam road (SH 175)
200000112. AS / TS / RAS:
19,78,00 16,42,02 3,00,00 1,73,62 1,62,36
CRF-TN-2018-19-43
18
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Wdg Minor Bridge at Km. 0/8 of Komarapalayam - Bhavani Road
7500113.
Thanjavur (NH) Division
AS / TS / RAS:
75,00 68,48 6,52 6,50 2
CRF-TN-2017-18 -48
Providing road safety measures including protective work and CD work from Km 0/0-5/2 of Catherine falls road.
70000114. AS / TS / RAS:
7,55,20 4,84,25 1,28,10 2,60,00 10,95
CRF-TN-2018-19-62
Strengthening of Alanganallur - Chathiravellalapatti (via) Muduvarpatti road in km 4/0 - 7/6 & 8/2 - 17/2.
135000115.
Sivagangai(NH) Division
AS / TS / RAS:
14,45,00 13,78,80 62,68 1 66,19
CRF-TN-2017-18-92
IImprovements to Kavittinaikenpatti-Lakshmipuram road km 0/0-7/031 including CD works.
40000116. AS / TS / RAS:
4,33,00 4,17,51 11,28 1 15,48
CRF-TN-2017-18-128
Widening from IL to DL in km 5/8 to 13/8 and Strengthening in km 2/4 to 13/8 of Pudupatti-Mangalrevu Road.
100000117. AS / TS / RAS:
10,82,00 10,52,55 19,02 ... ...
CRF-TN
61500118. AS / TS / RAS:
6,65,00 6,35,87 16,60 ... ...
Improvements to Uppur-Kottaiyur road from Km 28/6-36/8
Widening from DL to ML and Strengthening at km 1/0-3/0, 3/6-4/0,5/0-8/0, 8/4-12/0 and 13/6-17/0 of Thanichiyam-Seevagapatti road (via) Alanganallur-Vavidamaruthur road including CD Works.(MD 944)
177100119. AS / TS / RAS:
19,22,00 8,78,37 8,00,00 10,43,60 3
CRF-TN-2018-19-33
19
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
80000120.
Sivagangai(NH) Division
AS / TS / RAS:
8,67,00 8,35,50 26,14 ... ...
Strengthening of Alampatti-Sedapatti road km 7/0-18/4.
19000121. AS / TS / RAS:
1,89,88 1,66,40 16,72 ... ...
Providing Road Safety measures in in km 0/0-2/0, 7/0-15/4 of Thirumangalam- Pallapatti - Silukuvarpatti road inlcuding CD works and construction of retaining wall
120000122. AS / TS / RAS:
12,96,00 12,04,91 41,57 ... ...
Strengthening of Kumaram ‐ Sholavandan road in km 0/0 ‐ 15/320 (MDR 955)
Four Laning the Old Austinpatti Road in Km 0/0 - 2/0
200000123. AS / TS / RAS:
21,20,00 5,48,73 8,00,00 15,71,20 7
CRF-TN-2018-19-09
Construction of Vaigai South River Bank Road from Dindigul Road - Theppakulam
1120000124. AS / TS / RAS:
117,00,00 14,05,60 40,00,00 91,99,48 10,94,92
CRF-TN-2018-19-10
Construction of Vaigai South River Bank Road from Theppakulam - Viraganoor
480000125. AS / TS / RAS:
52,36,00 23,96,23 25,00,00 28,39,70 7
CRF-TN-2018-19-11
Construction of Vaigai North River Bank Road from Dindigul Road - Kuruvikaran Salai
780000126. AS / TS / RAS:
81,48,00 13,18,96 35,00,00 68,29,00 4
CRF-TN-2018-19-12
20
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Construction of Vaigai North River Bank Road from Anna Nagar - Viraganoor
480000127.
Sivagangai(NH) Division
AS / TS / RAS:
52,75,00 19,76,24 18,00,00 32,98,70 6
CRF-TN-2018-19-13
Construction of high level bridge at Km.44/4 of Vathalagundu-Peraiyur-Kariyapatti-Thiruchuli-Kamuthi-Sayalkudi road
45000128. AS / TS / RAS:
3,89,00 2,33,61 89,00 1,55,30 9
CRF-TN-2018-19-65
40000129. AS / TS / RAS:
4,35,00 4,16,77 12,38 ... ...
Strengthening in km 32/4-34/4 and 39/2-41/8 of Ramanathapuram-Nainarkoil-Sivagangai-Melur road including CD works & Construction of brest wall
Strengthening from Km 24/8- 37/0 & 38/4-47/8 of Kumbakonam - Mannargudi - Adirampattinam road
259200130.
Tirunelveli (NH) Division
AS / TS / RAS:
25,92,40 25,41,46 47 50,94 ...
CRF-TN-2017-18 -28
75000131. AS / TS / RAS:
7,94,00 7,84,57 4,44 ... ...
Strengthening of Grand Anaicut Cauveripattinam Road km 59/710- 62/6, 64/6 - 70/0 (SH 22)`
Strengthening of Muthupet Voimedu Road Km 11/0-15/9
50000132. AS / TS / RAS:
5,41,00 4,29,98 1,17,12 1,10,00 1,02
CRF-TN-2017-18-142
Improvements of Trichy - Pudukottai - Aranthangi - Mimisal Road at Km 96/4-97/8,99/0-102/4,103/0-103/6,104/0-107/0 and 108/0-111/0 (SH-26) Including Reconstruction of Pipe culvert at km 97/6,97/8,98/6,98/8,100/8,104/6 and 110/6
110000133. AS / TS / RAS:
11,69,00 10,76,35 2,66,26 90,79 1,86
CRF-TN-2017-18-141
21
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening and Strengthening of Pudukottai-Killukottai Manayeripatti Road Km 5/0-10/0.
50000134.
Tirunelveli (NH) Division
AS / TS / RAS:
5,19,00 3,37,29 4,15,92 1,77,25 4,46
CRF-TN-2017-18-126
Widening and Strengthening IL to DL of Vadavalam to Pudupatti Road from Km 11/8-20/0
90000135. AS / TS / RAS:
9,88,00 7,04,52 2,35,26 2,83,12 36
CRF-TN-2017-18-125
Widening and Strengthening SL to IL of Pudukottai -Manapparai road to Karaiyur Road via Kiilikudi from km 0/0-5/0
50000136. AS / TS / RAS:
5,22,00 4,83,06 18,92 35,00 3,94
CRF-TN-2017-18-124
200000137. AS / TS / RAS:
19,76,53 80,42 1,66 ... ...
Strengthening of Nagore - Vettor Road KM 15/0-23/0
Strengthening of Grand Anaicut-Cauverypattinam Road Km 89/6-96/0
65000138. AS / TS / RAS:
6,90,00 6,80,42 1,66 9,50 8
CRF-TN-2017-18-111
Strengthening of Nagore-Vettar Road Km 15/0-23/0 including Reconstruction of Culvert at Km 19/8 and Construction of Retaining wall at Km 15/2,15/4,15/6,16/10,17/10,18/2,8/4,18/6,18/8,18/10,21/10, 22/2,(SH 148)
200000139. AS / TS / RAS:
21,90,00 10,46,67 8,66,77 8,45,16 2,98,17
CRF-TN-2017-18-151
Widening IL to DL and Strengthening in Km 60/0-66/4 of Kumbakonam - Mannargudi - Adhirampattinam road including CD works and Retaining wall
102000140. AS / TS / RAS:
11,02,00 1,76,48 5,52,00 9,25,50 2
CRF-TN-2018-19-31
22
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Strengthening of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam – Kodiyakkarai road Km.39/0-49/6 (SH.63)
120000141.
Tirunelveli (NH) Division
AS / TS / RAS:
12,62,00 8,64,27 3,08,77 3,92,01 5,72
CRF-TN-2017-18-110
Construction of ROB at Km.29/10 (LC 37) of NH 209
180000142. AS / TS / RAS:
18,00,00 ... 8,00,00 ... 12,11,32
CRF-TN-2018-19-70
Strengthening in km 10/6-20/4 of Mannargudy-Sethubavachatiram road including reconstruction of culverts and construction of protective works(SH 146)
90000143. AS / TS / RAS:
9,76,76 9,52,92 1,52 23,82 2
CRF-TN-2017-18-109
Strengthening from Km 1/6 – 16/8 of Left Bank of work Vennar - Palliagraharam -Kalanchery road
409200144. AS / TS / RAS:
45,00,00 41,34,71 4,41,31 3,65,29 ...
CRF-TN-2017-18-38
Strengthening of Kodavasal - Koradachery - Lakshmangudi - Mavoor road Km.3/6 - 12/6, 17/6 - 35/6 including Construction of Retaining wall and Box Culverts (MDR609)
370000145. AS / TS / RAS:
40,68,00 4,06,38 20,00,00 26,61,62 10,00,00
CRF-TN-2018-19-32
50000146.
Nagercoil (NH) Division
AS / TS / RAS:
5,40,00 4,17,22 37,19 ... ...
Improvements to Trichy Chidambaram to Velipiringiyam road km 0/0-5/0
Widening from Single Lane to Intermediate Lane and Improvements of Puduvettaikudi - Labbaikudikadu road (via) Veppur at Km 12/2-18/220 including construction of slab culvert
100000147. AS / TS / RAS:
10,00,00 5,26,17 4,48,91 4,52,27 21,56
CRF-TN-2018-19-30
23
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening from Intermediate lane to Two lane and Improvements in Km.6/2-10/0 and 15/6-20/8 of Veppanthattai-Neikuppai-GST Road including CD works (MD-820)
150000148.
Nagercoil (NH) Division
AS / TS / RAS:
15,00,00 9,90,07 6,72,13 4,00,00 1,09,93
CRF-TN-2018-19-29
Widening Single Lane to Double Lane and Improvements of Andimadam - Devanur - Variyankaval road Km 0/0 - 15/2
180000149. AS / TS / RAS:
18,00,00 10,64,44 7,42,61 6,50,00 85,56
CRF-TN-2018-19-28
130000150. AS / TS / RAS:
14,10,00 13,69,95 15,77 ... ...
Improvements to Kodukkur - Kaduvetti road km 0/0 - 8/0 & 21/0-30/2
Widening from SL to IL and rebuilding Irugalur - Senganthi road from km 0/0 - 10/60
97500151. AS / TS / RAS:
10,69,00 9,93,16 75,84 67,73 8,11
CRF-TN-2016-17-106
Widneing from IL to FL and improvements at Km 32/0-35/4 of Thuraiyur-Perambalur
80000152. AS / TS / RAS:
8,70,00 6,28,84 2,13,30 2,30,00 11,16
CRF-TN-2017-18-114
74000153. AS / TS / RAS:
7,30,00 ... 32,92 ... ...
Wideing from Sl to IL and Improvements in Km 6/6-13/650 of Ayyalur Kudikadu - Santhanur Road including CD works.
40000154. AS / TS / RAS:
4,10,00 3,73,64 31,26 ... ...
Improvements to Poyyur Sundakkudi road to Oriyur road km 0/0-5/2
24
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
20000155.
Nagercoil (NH) Division
AS / TS / RAS:
2,16,00 2,10,91 5,10 ... ...
Widening from SL to IL and Improvements in Km 0/0 - 2/0 of NH 45 to Thiruvalakuruchi road including CD works and side Drain
40000156. AS / TS / RAS:
4,17,00 3,91,19 25,82 ... ...
Widening from Sl to IL and Improvements in Km 3/0 - 7/0 of Karai - Therani - Ootahur Road including CD works.
Widening from Single lane to Intermediate lane of Vedasandur - Kovilur road from Km. 0/0 - 17/935 including Reconstruction / Widening of Culverts.
50000157. AS / TS / RAS:
5,38,00 5,16,88 20,85 21,10 2
CRF-TN-2017-18-22
Strengthening of Natham-Pillaiyarnatham road km 8/2-19/6,21/6-27/0,31/2-32/8.
90000158. AS / TS / RAS:
9,18,70 8,55,94 62,77 62,76 ...
CRF-TN-2017-18-134
Improvements to Km 10/0-30/0 of Thalaiyuthu-Kallimandayam-Edayakottai road including Reconstruction of culverts and Reconstruction of Retaining wall
132000159. AS / TS / RAS:
13,20,00 12,94,29 25,46 25,36 35
CRF-TN-2017-18-21
Strenthening to Ranganathapuram Km 0/0-3/8
15000160. AS / TS / RAS:
1,25,00 1,07,79 17,21 17,20 1
CRF-TN-2017-18-78
Reconstruction of Minor Bridge at km 1/6(i) & (ii) of Poyyamani - Innungur road
30000161. AS / TS / RAS:
1,95,00 67,46 1,27,54 1,27,50 4
CRF-TN-2018-19-68
25
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Strengthening from Km 0/0-11/4 of Ambilikkai-Kuthilippai road. (MDR 970).
55000162. AS / TS / RAS:
5,93,00 5,83,62 8,10 9,30 8
CRF-TN-2017-18-120
Strengthening in km 12/0-24/0 and Widening in km 15/8-24/0 of Vathalagundu-Thandikudi road
65000163. AS / TS / RAS:
7,05,00 48,20 6,56,79 6,56,78 2
CRF-TN-2017-18-93
Widening from SL to IL & Strengthening of Kallidaikurichi Railway Feeder road to Manimuthuar Dam at Km 0/0-6/0.
71000164. AS / TS / RAS:
5,61,40 5,11,15 10,50 15,83 27,69
CRF-TN-2017-18-115
Widening SL to IL and Strengthening of Kavalkinaru to Radhapuram road at Km 5/450-14/2 including CD works.
90000165. AS / TS / RAS:
9,76,00 7,61,42 2,24,86 1,33,08 81,50
CRF-TN-2017-18-116
Widening IL to DL in Km 0/0-8/6 & km 9/8-15/880 and improvements in Km 0/0-8/6,9/8-11/8 & in km 14/8-15/880 of Paruvakudi-Sivagiri road including construction of retaining wall and CD works.
125000166. AS / TS / RAS:
12,55,00 8,39,50 8,53,41 4,00,00 15,50
CRF-TN-2017-18-119
Widening IL to DL and Strengthening from km 23/6 to 36/0 of Reddiarpatti -Vijayanarayanam road.
120000167. AS / TS / RAS:
12,00,00 9,73,07 1,98,48 1,31,31 95,62
CRF-TN-2017-18-146
Widening from SL to IL in Km 5/0-14/330 & Improvements in Km 0/0 -6/0 & 8/100 - 12/0 of Panagudi to Kallikulam road including CD works.
100000168. AS / TS / RAS:
10,00,00 8,23,07 98,73 1,10,68 66,25
CRF-TN-2017-18-152
26
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening from SL – IL Km 0/0-17/0 and improvement to Km 0/0-4/6, 6/0-8/0, 11/0-14/0, 15/0-17/0 of Radhapuram – Idayankudi road including CD works.
105000169. AS / TS / RAS:
11,43,30 10,81,13 12,26 3,58 58,59
CRF-TN-2017-18-19
Widening and Strengthening of road branching from Km 112/2 of NH 208 to Sambavarvadakarai road in Km 0/0-8/6 including CD works.
80000170. AS / TS / RAS:
7,95,10 7,63,23 5,39 1 31,86
CRF-TN-2017-18-37
Widening SL to IL and Strengthening of Vaithiyalingapuram Road in Km 0/0-7/8
60000171. AS / TS / RAS:
6,49,00 ... 5,00,00 1,50,00 4,99,00
CRF-TN-2018-19-58
Widening SL to DL of Subbayapuram-Thalayanai from Km 0/0-9/400 including CD works
160000172. AS / TS / RAS:
17,60,00 14,61,28 1,70,00 1,25,27 1,73,45
CRF-TN-2018-19-56
Widening from SL to DL and Improvements in km 0/0-17/400 of Kurunthamozhli - Kurinchankulam Road including widening of culverts, CD works and protective works.
260000173. AS / TS / RAS:
26,76,40 19,38,95 8,00,00 5,46,95 1,90,50
CRF-TN-2018-19-55
Widening IL to DL in km 0/0-10/4 of Kulasekaramangalam - Valasai Road including widening of culverts, CD works, protective works and Junction Improvements at km 5/6 (Sendamaram)
150000174. AS / TS / RAS:
16,32,00 1,70,79 8,00,00 12,83,27 1,77,94
CRF-TN-2018-19-54
Widening and Strengthening from Km 0/0-18/120 of Sankarankovil – Vasudevanallur road in including CD works
160000175. AS / TS / RAS:
17,11,00 16,38,08 9,62 1 72,91
CRF-TN-2017-18-18
27
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening & Strengthening of Tenkasi -Sundarapandipuram road in Km.0/0-9/2 including CD works
100000176. AS / TS / RAS:
10,00,00 9,37,67 54,24 1 62,32
CRF-TN-2016-17-112
70000177. AS / TS / RAS:
6,64,00 5,87,91 18,09 ... ...
Strengthening in Km 0/0-6/8 of Paramankurichi - Udangudi Road Including Side Drain at Km 6/0-6/8. Job No.CRF-TN-2017-18-117
180000178. AS / TS / RAS:
14,52,00 12,46,44 52,00 ... ...
Widening from SL to IL in Km. 6/0 - 17/8 and strengthening in Km. 6/0 - 15/0 & 15/8 - 17/0 Alagiyapandiyapuram - Keezhaveeranam Road including CD Works. Job No.CRF-TN-2018-19-52
100500179. AS / TS / RAS:
10,94,00 9,96,35 10,81 ... ...
Strengthening and Widening from SL to IL in Km 3/2-17/0 of Kadambur - Puliyampatty - Deivacheyalpuram road including CD works. Job No.CRF-TN-2017-18-118
120000180. AS / TS / RAS:
10,00,00 9,50,89 10,30 ... ...
Widening and Strengthening from Km 0/0-12/8 of Idaikal – Sendamaram road including CD works. CRF-TN-2017-18- 16
120000181. AS / TS / RAS:
12,00,00 10,52,18 50,00 ... ...
Widening from IL to DL and Strengthening in Km 0/0-9/6 of Kayathar - Kalugumalai Road. including CD works. Job No.CRF-TN-2018-19-57
Widening SL - IL and Strengthening in Km 1/2-6/965 of Malaipatti - Vellayapuram Road.
46000182. AS / TS / RAS:
4,75,00 4,53,78 8 21,00 22
CRF-TN-2017-18-91
28
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Strengthening in km 2/0-8/0, 9/0-9/2, 10/2-10/4 , 11/4-12/0, 13/0-14/6,17/0-20/4, 25/0-29/6 of Rajapalayam - Vembakottai Road
130000183. AS / TS / RAS:
13,00,00 12,01,58 1 98,00 42
CRF-TN-2016-17-66
90000184. AS / TS / RAS:
9,32,56 9,10,52 4,07 ... ...
Widening from IL - DL in Km 0/0 - 7/0 and Widening from SL-DL in Km 7/0-10/660 and Strengthening in Km 3/0 - 5/0 & Km 7/0-10/660 of Aruppukottai - Kurunthamadam Road including reconstruction of culvert and Construction of retaining wall.
96000185. AS / TS / RAS:
9,66,80 9,62,03 85 ... ...
Widening SL - IL and Strengthening in Km 2/8-14/8 of Sattur - Nenmeni Road to Madurai - Kanyakumari Road (via) Maniyampatti.
Widening DL to FL and strengthening in Km 0/0-8/650 of NH 49 (abandoned) to Ramanathapuram urban limit Road
350000186. AS / TS / RAS:
38,25,80 27,00,96 8,60,48 11,24,80 4
CRF-TN-2018-19-34
70000187. AS / TS / RAS:
7,70,00 1,22,14 9,00,00 ... ...
Widening from SL to IL and Strengthening in Km 0/0-7/900 of Thenur - Kambali road (Via Uvarkulam)
Widening and Strengthening from Km 2/0-11/0 & Km 13/0-16/0. of Puthendal to Earwadi road
146300188. AS / TS / RAS:
14,11,00 11,49,98 2,24,19 2,61,00 2
CRF-TN-2017-18-17
Widening and Strengthening from Km 0/0-10/0 of Ramanathapuram-Keelakkarai road to Rengunathapuram road
100000189. AS / TS / RAS:
8,85,00 7,23,93 98,21 1,61,00 7
CRF-TN-2017-18-20
29
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening SL to IL and Strengthening of Meenakshipuram-A.Mukkulam road km.0/0-12/6 including CD Works
100000190. AS / TS / RAS:
11,00,00 1,22,14 5,00,00 3,34,20 3,13,66
CRF-TN-2018-19-59
Improvements to Km 0/0-1/0 of Christober nagar road
2710191. AS / TS / RAS:
27,10 23,00 2,76 82 3,28
CRF-TN-2017-18-08
Improvements to Km 6/0-8/2 of old veeranamangalam road.
20000192. AS / TS / RAS:
2,00,00 1,66,09 31,09 2,30 31,61
CRF-TN-2017-18-05
Improvements to Parasalai - Kollencode Road km 4/0-7/6
30000193. AS / TS / RAS:
2,96,00 2,29,60 64,76 45,00 21,40
CRF -TN-2017-18-74
Improvements to Mulagumoodu - Colachel Road km 0/0-1/0 including CD works.
7000194. AS / TS / RAS:
67,70 65,18 1,65 1,23 1,29
CRF -TN-2017-18-73
Improvements to Marungoor - Amaravathivilai Road Km 0/0-2/2 including Drain
10000195. AS / TS / RAS:
95,06 89,34 2,47 5,70 2
CRF -TN-2017-18-72
Improvements to Maruthencode - Thiruthuvapuram Road Km 0/0-1/8 including CD works and Protective works.
10000196. AS / TS / RAS:
1,06,30 1,02,12 3,22 1,94 2,24
CRF -TN-2017-18-77
30
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Widening Single Lane to Intermediate Lane and Improvements to Irumpili Road Km 0/0-1/8 including CD works and Protective works.
10000197. AS / TS / RAS:
1,02,22 92,89 9,27 8,34 99
CRF -TN-2017-18-75
Improvements to Attoor - Moovathumugam - Charoor Road Km 0/0-2/0 including CD works and Protective works.
12000198. AS / TS / RAS:
1,15,42 66,43 62,87 48,90 9
CRF -TN-2017-18-76
Improvements to Km 0/0-2/2 of Kuzhivilai - Vilacheri road
15000199. AS / TS / RAS:
1,50,00 1,14,25 30,97 8,73 27,02
CRF-TN-2017-18-03
Improvements to Aralvoimozhi - Nedumangadu road km 48/8-48-9 including reconstruction of culvert at km 48/9
5000200. AS / TS / RAS:
42,50 1,97 39,81 1 40,52
CRF-TN-2017-18-55
Improvements to Km 4/0 - 6/8 of Marthandam - Karungal road
18800201. AS / TS / RAS:
1,88,00 1,71,88 16,47 9,09 7,03
CRF-TN-2017-18-01
Improvements to Km 2/0-4/0 of Choozal-Nadaikavoo road
11000202. AS / TS / RAS:
1,10,00 84,45 21,57 2,87 22,68
CRF-TN-2017-18-07
Improvements to Km 0/0-2/0 of Manjalumoodu market road
8400203. AS / TS / RAS:
84,00 72,73 9,39 1,49 9,78
CRF-TN-2017-18-06
31
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Improvements to Km 11/0-11/5 of Kuzhithurai-Thengaipattinam road
4750204. AS / TS / RAS:
47,50 37,69 9,10 1,03 8,78
CRF-TN-2017-18-02
Improvements to Km 0/0-1/8 of Therkkutherivilai -Veerabagubathy road
4713205. AS / TS / RAS:
45,00 38,72 4,73 73 5,55
CRF-TN-2017-18-09
Improvements to Km 9/8-10/0 & 12/2-12/8 of Kuzhithurai-Alancholai-Aarukani road including CD works
4500206. AS / TS / RAS:
42,50 35,21 5,65 52 6,77
CRF-TN-2017-18-04
Improvements to Km 0/0-0/7 of Pantivaikal bridge -Rajakkamangalam thurai road
2910207. AS / TS / RAS:
26,75 24,22 1,46 2,50 3
CRF-TN-2017-18-10
Widening SL to IL and Improvements to Thuckalay - Thadikkarankonam road km 8/6-17/2
70000208. AS / TS / RAS:
7,00,00 3,34 5,00,00 1,00,00 5,96,66
CRF-TN-2018-19-53
Improvements to Km 0/0-1/0 of Vadiveeswaram-Karuppukatti road( Via ootuvalmadam)
2750209. AS / TS / RAS:
25,00 21,54 2,46 3,40 6
CRF-TN-2017-18-11
Improvements to Kuzhithurai - Alancholai - Arukani Road Km 6/0-7/6
8500210. AS / TS / RAS:
91,30 89,73 1,76 1,50 7
CRF-TN-2017-18-56
32
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Improvements to Neerodi - Erayumanthurai at km 0/0-2/6 & 4/4-8/965
32500211. AS / TS / RAS:
3,43,00 1,74,59 1,68,57 76,83 91,58
CRF-TN-2017-18-57
Improvements to Iynthumarikonam Road Km 0/0 - 1/6
6000212. AS / TS / RAS:
60,59 48,80 18,45 7,27 4,52
CRF-TN-2017-18-67
Improvements to Suchindrum - Marungoor road to Suchindrum Vellamadam link Road Km 0/0-1/0 including and Protective works
52500213. AS / TS / RAS:
5,25,00 3,45,70 1,43,90 1,35,00 44,30
CRF-TN-2017-18-71
Improvements to Kanimadam - Kanagappapuam km 0/0-2/1 including CD works
10000214. AS / TS / RAS:
96,51 94,94 1,39 81 76
CRF-TN-2017-18-70
Improvements to Vellipillaiyarkoil - Keezhkarai Road Km 0/0 - 1/6.
10000215. AS / TS / RAS:
96,00 88,23 13,47 6,22 1,55
CRF-TN-2017-18-68
Improvements to Maruthoorkuricy - Pazhayakadai Road Km 0/0- 2/8
14000216. AS / TS / RAS:
1,43,00 79,30 66,74 5,17 58,53
CRF-TN-2017-18-66
Improvements to Puthenthurai road at km 0/0-0/8
3000217. AS / TS / RAS:
28,70 25,36 2,54 3,30 4
CRF-TN-2017-18-60
33
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
05 Roads
800 Other Expenditure
SA Revamped Central Road Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 05 800 SA 16 04( DPC )
Improvements to Melpalai - Kodukkachivilai- (via) Vadakkanvilagam Harijan Colony road at Km. 0/0-1/4
6000218. AS / TS / RAS:
65,90 60,19 48,78 5,66 5
CRF-TN-2017-18-59
Improvements to Maruthencode Road at km 3/0-4/6
7500219. AS / TS / RAS:
78,40 77,59 93 1 80
CRF-TN-2017-18-58
Improvements to Kolvel - Perumkulam - Thetticode Road Km 0/0 - 1/246
6000220. AS / TS / RAS:
55,97 47,44 ... 7,63 90
CRF-TN-2017-18-69
3,212,49,58 1,576,12,20 928,29,21 1,288,00,00 458,00,005054 05 800 SATOTAL -
34
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JS Road Works under Bharath Nirman
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JS
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 2 Chief Engineer, National Highways
16 Major Works 5054 80 800 JS 16 06( DPC )
Bharat Nirman - Maintenance
7984001. AS / TS / RAS:
79,84,00 ... 2,10,00 2,10,00 2,30,00
G.O. (D) No.21, Rural Development & Panchayat Raj (CGS2) Department, dt.13.02.2015, G.O. (D) No.105, Rural Development & Panchayat Raj (CGS2) Department, dt.21.09.2017, G.O. (D) No.90, Rural Development & Panchayat Raj (CGS2) Department, dt.1.08.2016
79,84,00 ... 2,10,00 2,10,00 2,30,005054 80 800 JSTOTAL -
35
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Providing sanitary arrangements in Assistant Divisional Engineer Quarters building and Assistant Engineer Quarters building in (H), C&M Sub-division, Gingee.
1001.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Re-Construction of Common Toilet / Bath room for Sub-Divisional Office, Vanur
1002. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing water pipe line to Traveller's Bungalow suit I & II and Assistant Divisional Engineer, Assistant Engineer office building, Gingee
1003. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing sanitary arrangements in Traveller's Bungalow suit I & II (H), C&M Sub-division Office, Gingee
1004. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Improvements to Flooring at Suit -II of Traveller's Bungalow in (H), C&M Gingee Sub-division
1005. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Improvements to Flooring at Suit -I of Traveller's Bungalow in (H), C&M Gingee Sub-division
1006. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Sanitory facilities and Repairs to Septic Tank in the Division Office building, Villupuram.
1007. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
36
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to Damaged Roofing at Suit -I of Traveller's Bungalow in (H), C&M Gingee Sub-division
1008.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Head Draughting Officer Room in Villupuram (H) C&M Circle office.
1009. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Electrical works in Villupuram (H) C&M, Division Office.
10010. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Doors & Windows of Record room in Ist floor of Division Office building @ Villupuram
10011. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Damaged Roofing at Suit -II of Traveller's Bungalow in (H), C&M Gingee Sub-division
10012. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Extension of Assistant Divisional Engineer's room in Sub-Divisional Office, Vanur
10013. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Trevelors Bungalow at Bhuvanagiri of Kurinjipady (H) C&M Sub-Division (South side)
10014.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
37
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to Damaged Roofing to QC Annexure Building, Vridhachalam
10015.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Sanitary arrangement to QC Annexure Building,Vridhachalam
10016. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of common toilet for panruti (H)C&M Office Building at Travelers Bangalow Compound
10017. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of common toilet for panruti (H)C&M Office Building at Travelers Bangalow Compound
10018. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reparing Compound Wall for panruti (H)C&M Travelers Bangalow(Left side)
10019. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Replacing of Doors and windows ,Improvements of Flooring panruti (H)C&M Office Building at Travelers Bangalow
10020. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Trevelors Bungalow at Bhuvanagiri of Kurinjipady (H) C&M Sub-Division (East Side)
10021. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
38
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to Damaged Roofing to Sub-Division Building
10022.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reparing Compound Wall for panruti (H)C&M Travelers Bangalow (Right side)
10023. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to compound wall of Kurinjipady (H) C&M Sub-Division (North side)
10024. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Flooring & Replacing of Doors and Windows in QC Annexure Building,Vridhachalam
10025. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to compound wall of Kurinjipady (H) C&M Sub-Division (Union Office side)
10026. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of compound wall at Needamangalam (H) C&M., Section office (west side-4 )
10027.
Thiruvarur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (Northeast Side No.3)
10028. AS / TS / RAS:
1,00 ... ... ... 1,00
39
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (North Side No.1)
10029.
Thiruvarur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (North Side No.2)
10030. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (North Side No.3)
10031. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (Northeast Side No.1)
10032. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (Northeast Side No.2)
10033. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Septic Tank & Sanitory facilities at ADE (H) Quarters, Thiruthuraipoondi
10034. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of compound wall at Needamangalam (H) C&M., Section office (west side-3 )
10035. AS / TS / RAS:
1,00 ... ... ... 1,00
40
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to Mannargudi (H) C&M., Section office
10036.
Thiruvarur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Raising Compound wall In Nannilam (H)Sub division East side
10037. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi (East Side No.2)
10038. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Compound Wall at Sub-Divisional Office (Highways) Thiruthuraipoondi ( East Side No.1)
10039. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of compound wall at Needamangalam (H) C&M., Section office (west side-2 )
10040. AS / TS / RAS:
1,00 ... ... ... 1,00
Raising Compound wall In Nannilam (H)Sub division North East side
10041. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Mannargudi (H) C&M., Sub-Division office
10042. AS / TS / RAS:
1,00 ... ... ... 1,00
41
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Providing Flooring Tiles in ADE & AE Room at Sub-Divisional Office (H) Thiruthuraipoondi
10043.
Thiruvarur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Electrification works on ADE & AE Room at Sub-Divisional Office (H) Thiruthuraipoondi
10044. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of compound wall at Needamangalam (H) C&M., Section office (west side-1 )
10045. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Toilet & Electrification works at ADE (H) Quarters, Thiruthuraipoondi
10046. AS / TS / RAS:
1,00 ... ... ... 1,00
Raising Compound wall In Nannilam (H)Sub division North West side
10047. AS / TS / RAS:
1,00 ... ... ... 1,00
Raising Compound wall In Nannilam (H)Sub division South West side
10048. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall QC Building front left side at pollachi.
10049.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
42
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to RC room roof slab at Sulthanpet Section office.
10050.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to AE room wall and joineries at Sulthanpet Section office.
10051. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall QC Building back side at pollachi.
10052. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall Store shed C&M Section Office front side at pollachi.
10053. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall Store shed C&M Section Office left side at pollachi.
10054. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall Store shed C&M Section Office building back side at pollachi.
10055. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to out side paver block in cement godown at Kinathukadavu (office of the Assistant Divisional Engineer)
10056. AS / TS / RAS:
1,00 ... ... ... 1,00
43
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Special Repairs to North Side Compound wall to Section Office at Sulthanpet Section
10057.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Special Repairs to South Side Compound wall to Section Office at Sulthanpet Section
10058. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Rear Compound Wall Right side at Anaimalai (H), C&M, Sub Division
10059. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Compound wall in Divisional Engineer Quarters at Pollachi.
10060. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Compound wall in Assistant Divisional Engineer Quarters at Pollachi.
10061. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reconstruction of Compound wall to Superintents Quarters at Pollachi.
10062. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Front Compound Wall Right side at Anaimalai (H), C&M, Sub Division
10063. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
44
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Special Repairs to East Side Compound wall to Section Office at Sulthanpet Section
10064.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Rear Compound Wall Left Side at Anaimalai (H), C&M, Sub Division
10065. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Front Compound Wall Left Side at Anaimalai (H), C&M, Sub Division
10066. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to AE room roof slab Sulthanpet Section office.
10067. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to flooring Tles & Roof tils at Sulthanpet Section office
10068. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Building RC room wall and joineries at Sulthanpet Section office
10069. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall QC Building front side centre portion at pollachi.
10070. AS / TS / RAS:
1,00 ... ... ... 1,00
45
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repairs to out side staff toilet in cement godown at Kinathukadavu (office of the Assistant Divisional Engineer)
10071.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Cement godown roof slab at Sulthanpet Section office.
10072. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to staircase and main gate at Sulthanpet Section office.
10073. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to compound wall QC Building front right side at pollachi.
10074. AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to water sump in cement godown at Kinathukadavu (office of the Assistant Divisional Engineer)
10075. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of East side compoundwall of Assistant Divisional Engineer (H) C&M, Melur office Quarters
10076.
Madurai (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Providing paver block in East side compoundwall portion of Assistant Divisional Engineer (H) C&M, Melur office Quarters
10077. AS / TS / RAS:
1,00 ... ... ... 1,00
46
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Construction of East side compoundwall of Assistant Engineer (H) C&M, Melur office Quarters
10078.
Madurai (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Providing paver block in West side compoundwall portion of Assistant Divisional Engineer (H) C&M, Melur office Quarters
10079. AS / TS / RAS:
1,00 ... ... ... 1,00
Providing paver block in Assistant Engineer (H) C&M, Melur office Quarters
10080. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of West side compoundwall of Assistant Engineer (H) C&M, Melur office Quarters
10081. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of North side compoundwall of Assistant Engineer (H) C&M, Melur office Quarters
10082. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of South side compoundwall of Assistant Engineer (H) C&M, Melur office Quarters
10083. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of West side compoundwall of Assistant Divisional Engineer (H) C&M, Melur office Quarters
10084. AS / TS / RAS:
1,00 ... ... ... 1,00
47
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Construction of North side compoundwall of Assistant Divisional Engineer (H) C&M, Melur office Quarters
10085.
Madurai (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of South side compoundwall of Assistant Divisional Engineer (H) C&M, Melur office Quarters
10086. AS / TS / RAS:
1,00 ... ... ... 1,00
Repair to compound wall in Natham sub division toward (West side part II)
10087.
Theni (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 ... ...
Repair to compound wall in Natham sub division toward (North side part I)
10088. AS / TS / RAS:
1,00 ... 1,00 ... ...
Repair to compound wall in Natham sub division toward (west side part I)
10089. AS / TS / RAS:
1,00 ... 1,00 ... ...
Repair to compound wall in Natham sub division toward (East side part I)
10090. AS / TS / RAS:
1,00 ... 1,00 ... ...
Repair to compound wall in Natham sub division toward (south side part II)
10091. AS / TS / RAS:
1,00 ... 1,00 ... ...
48
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repair to compound wall in Natham sub division toward (south side part I)
10092.
Theni (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 ... ...
Repair to compound wall in Natham sub division toward (North side part II)
10093. AS / TS / RAS:
1,00 ... 1,00 ... ...
Repair to compound wall in Natham sub division toward (south side part II)
10094.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to compound wall in Natham sub division toward (North side part II)
10095. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to compound wall in Natham sub division toward (North side part I)
10096. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to compound wall in Natham sub division toward (West side part II)
10097. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to compound wall in Natham sub division toward (west side part I)
10098. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
49
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
2059 PUBLIC WORKS
80 General
053 Maintenance and Repairs
AE Buildings and Tourist Bungalows under the control of Chief Engineer (General), Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]2059 80 053 AE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 2059 80 053 AE 17 07( DPC )
Repair to compound wall in Natham sub division toward (East side part I)
10099.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to compound wall in Natham sub division toward (south side part I)
100100. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
1,00,00 ... 50,00 43,00 50,002059 80 053 AETOTAL -
50
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
03 State Highways
800 Other Expenditure
JA Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 03 800 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 03 800 JA 17 07( DPC )
Reconstruction of body wall at km 58/4 (L/S) of Virudhachalam - Ulundurpet - Villupuram road (SH 69)
1001.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Well Protective wall at Km 8/6 of Vellimedupet-Pondy (via) Mailam Road (SH 136)
1002. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Parapet Wall at Km 61/8, 64/4, 66/6 of Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road (SH 63) and Km.55/2(i),(ii) of Thiruvarur-Mannargudi-Muthupet Road (SH202)
1003.
Thiruvarur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Parapet Wall in Minor Bridge at Km 9/2 of Muthupet - Voimedu Road (MD640) and Culvert at Km 92/2,92/6 of Mayiladuthurai - Muthupet Road (MD 256)
1004. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Parapet over Existing Retaining Wall at km 42/10 of Thadicombu - pallapatti - Aravakurichy Road (SH 193)
1005.
Karur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/250-0/260 of Kodai-Ghat Road (SH-156)
1006.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/280-0/290 of Kodai-Ghat Road (SH-156)
1007. AS / TS / RAS:
1,00 ... ... ... 1,00
51
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
03 State Highways
800 Other Expenditure
JA Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 03 800 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 03 800 JA 17 07( DPC )
Construction of Retainingwall at km 0/200-0/210 of Kodai-Ghat Road (SH-156)
1008.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/210-0/220 of Kodai-Ghat Road (SH-156)
1009. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/220-0/230 of Kodai-Ghat Road (SH-156)
10010. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/240-0/250 of Kodai-Ghat Road (SH-156)
10011. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/260-0/270 of Kodai-Ghat Road (SH-156)
10012. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km0/270-0/280 of Kodai-Ghat Road (SH-156)
10013. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retainingwall at km 0/230-0/240 of Kodai-Ghat Road (SH-156)
10014. AS / TS / RAS:
1,00 ... ... ... 1,00
52
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
03 State Highways
800 Other Expenditure
JA Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 03 800 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 03 800 JA 17 07( DPC )
New Sanction
610015. AS / TS / RAS:
61,00 ... 48,00 ... 13,00
75,00 ... 50,00 2,00 25,003054 03 800 JATOTAL -
53
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JA District roads - Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JA 17 09( DPC )
Construction of Protective wall at Km 18/6 of Soorapattu-Ottampattu (via) Athiyur-Anandapuram road (MD-807)
1001.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 11/8, 12/8, & 13/2 of Vridhachalam- Palakollai Road (MD-746)
1002.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at km 9/8 of Eraiyur - Kandappankurichi - Nallur road (MD-1118)
1003. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at km 9/6 of Eraiyur - Kandappankurichi - Nallur road (MD-1118)
1004. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at km 3/4 of Eraiyur - Kandappankurichi - Nallur road (MD-1118)
1005. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 13/8(i) & 13/8 (ii) of Vridhachalam- Palakollai Road (MD-746)
1006. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at km 26/2 & 29/10 of Thittagudy-Sirupakkam road (via) Avatti, Ma.Pudaiyur (MD-814)
1007. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
54
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JA District roads - Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JA 17 09( DPC )
Repairs to Culvert at km9/4, 9/6, & 10/4 of Vridhachalam- Palakollai Road
1008.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 6/2, 6/6,6/8, & 9/2 of Vridhachalam- Palakollai Road
1009. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 7/6 & 8/6 of Vridhachalam- Palakollai Road (MD-746)
10010. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 4/4, 5/8, & 5/10 of Vridhachalam- Palakollai Road (MD-746)
10011. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 2/6 & 5/2 of Vridhachalam- Palakollai Road (MD-746)
10012. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 2/10 & 3/8 of Vridhachalam- Palakollai Road (MD-746)
10013. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at Km. 3/10, 4/10,6/4, 6/6 & 7/6 of Chidambaram-Veeranam Tank Bund road (via) Keelnatham (MD-583)
10014. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
55
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JA District roads - Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JA 17 09( DPC )
Repairs to culvert at Km. 9/8(i), 10/4 & 12/4 of Chidambaram - Pitchavaram tourism road (MD-1039)
10015.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to Culvert at km 2/2 Kadampuliyur – Ulundurpettai Road (via) Sendamangalam – Perperiyankuppam Road Km 0/0 – 15/8 (MD 602)
10016. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Minor Bridge at km 1/4 & culvert at km 4/10 of of Thittagudy-Sirupakkam road (via) Avatti, Ma.Pudaiyur (MD-814)
10017. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 14/4, 15/4, 15/6, 16/6 & 17/4 of Vridhachalam- Palakollai Road (MD-746)
10018. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Widening of Pipe Culvert at Km.5/8 of Mylampatty - Palayam road (MD280)
10019.
Karur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 28/120- 28/125 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
10020.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 28/115 - 28/120 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
10021. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
56
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JA District roads - Construction
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JA 17 09( DPC )
Construction of Retaining wall at km 28/100 - 28/105 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
10022.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 28/105 - 28/110 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
10023. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 28/110 - 28/115 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
10024. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
New Sanction
510025. AS / TS / RAS:
51,00 ... 27,00 ... 24,00
75,00 ... 50,00 23,00 25,003054 04 337 JATOTAL -
57
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JE 17 01( DPC )
Providing Well Protectivewall at Km 2/4 of the road from Mailam-Pondy road to NH-45 (via) Thennalapakkam, Padirapuliyur road
1001.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Protective wall at Km 0/8(ii) of Melkalavai – Echur road (via) Neganur road
1002. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Protective wall at Km 0/8(i) of Melkalavai – Echur road (via) Neganur road
1003. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Protective wall at Km 0/4(L) of Melkalavai – Echur road (via) Neganur road
1004. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reconstruction of body wall at km 0/6 (L/S) of Kandampakkam-Marakathapuram road
1005. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reconstruction of culvert at km 0/10 (L/S) of Anniyur - Surapattu road to Elusempon road
1006. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reconstruction of culvert at km 0/10 (R/S) of Anniyur - Surapattu road to Elusempon road
1007. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
58
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JE 17 01( DPC )
Construction of Protective wall at Km 0/4(R) of Melkalavai – Echur road (via) Neganur road
1008.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reconstruction of culvert at km 11/4 (R/S) of Vikiravandai-Nemur road
1009. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Well Protectivewall at Km 7/8 of Nolampur - Avanipoor Road
10010. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Well Protectivewall at Km 10/2 of Tindivanam - Thengapakkam Road
10011. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Well Protectivewall at Km 2/6 of Tindivanam - Thengapakkam Road
10012. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Well Protectivewall at Km 6/6 of Tindivanam - Olakkur Road
10013. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing Well Protectivewall at Km 3/6 of Nolampur - Avanipoor Road
10014. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
59
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JE 17 01( DPC )
Reconstruction of culvert at km 11/4 (L/S) of Vikiravandai-Nemur road
10015.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Minor Bridge at km 0/2 of Kattumailur-Kongarampalayam road
10016.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 1/6, 1/4, 1/8, 2/4 of Marudhadu - Irandairavillagam road
10017. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Minor Bridge at km 4/2 of Pennadam-Vridhachalam road and Uchimedu link road (SCR)
10018. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Minor Bridge at km 1/2 & 2/2 of Pennadam-Vridhachalam road and Uchimedu link road (SCR)
10019. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Minor Bridge at km 3/10 & 6/4 of Kattumailur-Kongarampalayam road
10020. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Minor Bridge at km 1/2 of Chennai-Thiruchi-Dindugal road to Korakkai road
10021. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
60
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JE 17 01( DPC )
Repairs to culvert at Km.1/4, 5/6, 7/4 & 7/8 of Ponneri Tank Bund road
10022.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at Km.1/2, 1/4, 1/8 & 2/6 of Sakkankudi-Keelnatham road to Veeranam Tank Bund road (via) South Arirajapuram
10023. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to culvert at Km.0/4, 0/10, 1/4 & 1/6 of The road from km.132/2 of Trichy-Chidambaram road to Elanangur road
10024. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to Bridge at Km 6/4 of The Road from Km 31/2 of Vikkiravandi – Kumbakonam – Thanjavour Road to C.N.Palayam (via) Sathipattu Road Km 0/0 – 8/9.
10025. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to Bridge at Km 6/4 of The Road from Km 31/2 of Vikkiravandi – Kumbakonam – Thanjavour Road to C.N.Palayam (via) Sathipattu Road Km 0/0 – 8/9.
10026. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 3/6, 4/2, 5/2, 5/2,of Maligaimedu - Melkumaramangalam road
10027. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Culvert at km 0/8, 0/10, 1/6 & 1/8 of The road from km 8/4 of Cuddalore - Chittoor road joints at km 7/10 of Cuddalore - Thirukoilur - Sankarapuram (via) Karamanikuppam
10028. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
61
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JE 17 01( DPC )
Repairs to Culvert at km 0/6, 0/8, 1/6, 1/8, 2/4, 2/6, 3/2, 3/4, of Kalaiyur - Irandairavillagam road
10029.
Cuddalore (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repair to Culvert at km 1/8 ofThe Road from Km 33/4 of Cuddalore – Chithoor Road to Kamatchipettai Road
10030. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Widening of Pipe Culvert at Km.12/2 of Potharavuthanpatty - Kosur road
10031.
Karur (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to Parapet Wall at Km 2/2, 4/6 (L/S), 4/6 (R/S) of ATPPC Road - Semmanampathi (via) Kelavanpudur road.
10032.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Parapet Wall at Km 3/4, 3/6, 10/6 of Ambarampalayam - Sethumadai road to Semmanampathi road.
10033. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 2/600 - 2/605 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10034.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 2/620 - 2/625 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10035. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
62
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 04 337 JE 17 01( DPC )
Construction of Retaining wall at km 2/610 - 2/615 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10036.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 2/615 - 2/620of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10037. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Construction of Retaining wall at km 2/605 - 2/610 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10038. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
47 Stores and Equipments 3054 04 337 JE 47 08( DPC )
Construction of Retaining wall at km 2/842 - 2/845 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1001.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/839 - 2/842 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1002. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/836 - 2/839 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1003. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/845 - 2/848 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1004. AS / TS / RAS:
1,00 ... ... ... 1,00
63
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
47 Stores and Equipments 3054 04 337 JE 47 08( DPC )
Construction of Retaining wall at km 2/848 - 2/851 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1005.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/851 - 2/854 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1006. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/830- 2/833 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1007. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/857 - 2/860 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1008. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/860 - 2/863 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
1009. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/863 - 2/866 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10010. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/866 - 2/869 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10011. AS / TS / RAS:
1,00 ... ... ... 1,00
64
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
47 Stores and Equipments 3054 04 337 JE 47 08( DPC )
Construction of Retaining wall at km 2/869 - 2/872 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10012.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/833 - 2/836 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10013. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/875 - 2/878 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10014. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/928 - 2/931 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10015. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/878 - 2/881 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10016. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/881 - 2/884 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10017. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/910 - 2/913 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10018. AS / TS / RAS:
1,00 ... ... ... 1,00
65
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
47 Stores and Equipments 3054 04 337 JE 47 08( DPC )
Construction of Retaining wall at km 2/913 - 2/916 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10019.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/854 - 2/857 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10020. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/931 - 2/934 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10021. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/916 - 2/919 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10022. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/919 - 2/922 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10023. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/922 - 2/925 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10024. AS / TS / RAS:
1,00 ... ... ... 1,00
Construction of Retaining wall at km 2/925 - 2/928 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10025. AS / TS / RAS:
1,00 ... ... ... 1,00
66
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
04 District and Other Roads
337 Road Works
JE Rural Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
47 Stores and Equipments 3054 04 337 JE 47 08( DPC )
Construction of Retaining wall at km 2/872 - 2/875 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
10026.
Dindigul (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
New Sanction
360027. AS / TS / RAS:
36,00 ... 13,00 ... 23,00
1,00,00 ... 50,00 37,00 50,003054 04 337 JETOTAL -
67
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
80 General
800 Other Expenditure
AX Construction of quarters for basic servants and drivers in circuit houses and Travellers Bungalows
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 80 800 AX
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 80 800 AX 17 07( DPC )
Repairs to Watchman quarters in Gingee (H), C&M Sub-division, Gingee
1001.
Villupuram (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to pump house in Gingee (H), C&M Sub-division, Gingee
1002. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to East and North side Compound wall of Tea shop building at Rottikadai
1003.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Store shed Left Side at Anaimalai (H), C&M, Sub Division
1004. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Parapat Wall of Store shed Building at Anaimalai (H), C&M, Sub Division
1005. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Reconstruction of Compound wall to Basic Servants Quarters at Pollachi.
1006. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Electrification works on Tea shop building at Rottikadai
1007. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
68
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
80 General
800 Other Expenditure
AX Construction of quarters for basic servants and drivers in circuit houses and Travellers Bungalows
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 80 800 AX
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 80 800 AX 17 07( DPC )
Reconstruction of Compound wall to Basic Servant Quarters at Pollachi.
1008.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... ... ... 1,00
Repairs to North side Compound wall of Tea shop building at Rottikadai
1009. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Doors and Windows in Tea shop building at Rottikadai
10010. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to South side Compound wall of Tea shop building at Rottikadai
10011. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to West side Compound wall of Tea shop building at Rottikadai
10012. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Plumbing works on Tea shop building at Rottikadai
10013. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Sanitary arrangements on Tea shop building at Rottikadai
10014. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
69
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
3054 ROADS AND BRIDGES
80 General
800 Other Expenditure
AX Construction of quarters for basic servants and drivers in circuit houses and Travellers Bungalows
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]3054 80 800 AX
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
17 Minor Works 3054 80 800 AX 17 07( DPC )
Repairs to Parking Shed on Tea shop building at Rottikadai
10015.
Pollachi (H) C&M Division
AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Additional accomodations on Tea shop building at Rottikadai
10016. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to flooring around Tea shop building at Rottikadai
10017. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Repairs to Store shed Right side at Anaimalai (H), C&M, Sub Division
10018. AS / TS / RAS:
1,00 ... 1,00 1,00 ...
Providing weathering course to Basic Servant Quarters at Pollachi.
10019. AS / TS / RAS:
1,00 ... ... ... 1,00
Providing sanitary arrangement to basic servant quarters at Pollachi.
10020. AS / TS / RAS:
1,00 ... ... ... 1,00
New Sanction
400021. AS / TS / RAS:
40,00 ... 33,00 ... 7,00
60,00 ... 50,00 17,00 10,003054 80 800 AXTOTAL -
70
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
4059 CAPITAL OUTLAY ON PUBLIC WORKS
01 Office Buildings
051 Construction
KT Construction of Buildings - Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 4059 01 051 KT 16 04( DPC )
Construction of Combined Highways Office Complex in Chennai for all Chief Engineer in Highways Department
1321291.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
13,21,29 13,21,29 1 ... ...
G.O.Ms.No.207, Highways and Minor Ports Department, dated:17-12-2012
Construction of Trining Centre in the campus of Q.A&R of Highways Department, Guindy, Chennai. G.O.Ms.No.173/H&MP (HF.1) dept/dt.23.10.2013.
1416002. AS / TS / RAS:
14,16,00 14,16,00 1 ... ...
Part-II-2013-14
The upgradation of Highways Research Station like modernization of library and construction of compound wall at Guindy.
131883. AS / TS / RAS:
1,31,88 1,31,88 1 ... ...
G.O.Ms.No.134/H&M.P (HF.1) / dt.25.11.2015.
Construction of Combined Highways Office Complex in Chennai for all Chief Engineer in Highways Department - Addle.Sanction
2161004. AS / TS / RAS:
21,61,00 21,61,00 1 ... ...
Part II.2014-15
Infrastruture facilities to the training centre building in HRS campus, Chennai
350005. AS / TS / RAS:
3,50,00 2,85,25 1 64,75 ...
G.O.Ms.No.156/H&M.P (HF.1) / dt.20.09.2018.
Construction of Thandrampattu Sub Division and Section Office building.
35006.
Tiruvannamalai (H) C&M Division
AS / TS / RAS:
35,00 31,16 1 3,84 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
Construction of Kalasapakkam Section Office building.
15007. AS / TS / RAS:
15,00 15,00 1 ... ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
71
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
4059 CAPITAL OUTLAY ON PUBLIC WORKS
01 Office Buildings
051 Construction
KT Construction of Buildings - Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 4059 01 051 KT 16 04( DPC )
Construction of Keeranur Sub Division and Section Office building.
35008.
Pudukottai (H) C&M Division
AS / TS / RAS:
35,00 20,91 1 14,09 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
Construction of Thirumayam Sub Division and Section Office building.
35009. AS / TS / RAS:
35,00 20,28 1 14,72 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
Construction of Alangudi Sub Division and Section Office building.
350010. AS / TS / RAS:
35,00 17,39 1 17,61 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
Construction of TB at Ilayankudi
350011.
Sivaganga (H) C&M Division
AS / TS / RAS:
41,00 41,00 1 ... ...
G.O.Ms.No.49/H&M.P (HP.2) / dt.30.05.2019.
Construction of Cheranmadevi Section Office building.
150012.
Tirunelveli (H) C&M Division
AS / TS / RAS:
15,00 13,00 1 2,00 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
Construction of Alangulam Section Office building.
150013. AS / TS / RAS:
15,00 13,00 1 2,00 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
Construction of Palani Division Office building.
550014. AS / TS / RAS:
55,00 48,93 1 6,07 ...
G.O.(4D).No.7/H&M.P (HF.1) / dt.23.11.2018.
72
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
4059 CAPITAL OUTLAY ON PUBLIC WORKS
01 Office Buildings
051 Construction
KT Construction of Buildings - Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 4059 01 051 KT 16 04( DPC )
Construction of integrated office buildings for Highways(NABARD & Rural Roads) circle & Division offices at Salem.
870015. AS / TS / RAS:
87,00 ... 1 87,00 1
G.O.Ms.No.
57,48,17 55,36,09 15 2,12,08 14059 01 051 KTTOTAL -
73
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JA Original works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 101 JA 16 07( DPC )
Construction of new 4 lane HLB at Km.69/300 of ECR across seaback at Illayankuppam near Kalpakkam.
2377851.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
23,77,85 23,77,85 1 ... ...
G.O.(RT).No.10/Hw&MP dept/dt.30.01.2018.
Work of Dismantling the existing old steel bridge across Kollidam River at Km.312/2-313/0 ande Providing bed protection to the bridge across Kollidam river at Km.312/2-313/0 of Chennai - Trichy - Dindigul road.
977002.
Trichy (H) C&M Division
AS / TS / RAS:
9,77,00 ... ... 1,00,00 8,77,00
G.O.(Ms).No.72/Hw&MP (HP.2)dept/dt.19.05.2020.
64 Lands 5054 03 101 JA 64 06( DPC )
Construction of High level bridge connecting Kangeyanallur to Sathuvachari village across Palar river.
2253001.
Vellore (H) C&M Division
AS / TS / RAS:
22,53,00 ... ... ... 1,00,00
G.O.(Ms).No.158/Hw&MP(HQ.2) dept/dt.10.12.2020.
56,07,85 23,77,85 1 1,00,00 9,77,005054 03 101 JATOTAL -
74
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JF Construction of Flyover at Salem Junction - Yercaud Road
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 101 JF 16 07( DPC )
Construction of Flyover in Thiruvagoundanur Junction in Salem City.
2677001.
Salem (H) C&M Division
AS / TS / RAS:
26,77,00 26,08,54 1 1 ...
G.O.Ms.No.7/ H&M.P (HP.1) / dt.07.01.2016.
Construction of Flyover at Salem junction -Yercaud road.
32000002. AS / TS / RAS:
441,00,00 370,10,46 25,34,98 70,89,54 1
G.O.Ms.No.56/ H&M.P (HP.1) / dt.14.05.2015 & G.O.Ms.No.82/ H&M.P (HP.2) / dt.06.08.2019.
Construction of combined flyover for Kuranguchavadi and AVR roundana junction.
11140003. AS / TS / RAS:
111,40,00 72,20,63 1 1 ...
G.O.Ms.No.7/ H&M.P (HP.1) / dt.07.01.2016.
579,17,00 468,39,63 25,35,00 70,89,56 15054 03 101 JFTOTAL -
75
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JA Original works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 03 337 JA 64 07( DPC )
L.A cost for Thiruthuraipoondi Bye-pass
500001.
Thiruvarur (H) C&M Division
AS / TS / RAS:
5,00,00 4,94,77 1 1,00 ...
G.O.Ms.No.174, Highways(HP.2) Dept.dated. 08-07-2008. / G.O. MS. No.75 HW&MP Dept., Dt.23.09.17
Formation of outer ring road for Erode Town (Land Acquisition)
220000/4997002. AS / TS / RAS:
49,97,00 ... ... 26,97,00 1
G.O.Ms.No.88, Highways(HS.1) Dept.dated. 16-07-2020. / G.O. MS. No.103 Highways (HS.1)Dept., Dt.13.08.2020.
54,97,00 4,94,77 1 26,98,00 15054 03 337 JATOTAL -
76
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JD 16 02( DPC )
Improvement to Pallavaram - Thoraipakkam road at Km.5/0-7/2 and 9/7-10/5.
1386001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
13,86,00 12,38,02 50,00 1 1
G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016
Construction of drain at Km 5/0-6/250 of Pallavaram-Thoraipakkam road including preparation of DPR
2410002. AS / TS / RAS:
24,10,00 2,65,43 14,10,00 21,44,57 ...
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
Improvemets to Pallavaram-Thoraipakkam road at Km 10/190-10/4 including construction of drain and providing paver block.
100003. AS / TS / RAS:
1,00,00 91,49 7,44 8,51 ...
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
Construction of closed macro Drain at Km 0/530-1/180 of Velachery Bye pass road.
1440004. AS / TS / RAS:
14,40,00 8,21,50 8,90,00 6,18,50 ...
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
Improvement to Marmalong Bridge - Irumbuliyur road at Km.5/0-5/7, 6/5-8/0 and 10/8-12/3.
1530005. AS / TS / RAS:
15,30,00 13,24,00 50,00 ... ...
G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016
"Construction of Drain in Grand Northern Trunk road at Km 0/7 - 3/0 (SHU 87) LS & RS of including constructionof 8 no of Box culvert at
Km 1/050, 1/225, 1/430,1/750, 1/850, 2/0, 2/200 & 2/875"
3300006. AS / TS / RAS:
33,00,00 ... ... ... 6,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
"Construction of Drain at Km 21/4-22/6 (L/S) & RS and 23/4-24/0 (RS) and lead drain at km 22/6 of Grand Southern Trunk Road. (SHU
88)"
1275007. AS / TS / RAS:
12,75,00 ... ... ... 2,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
77
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JD 16 02( DPC )
Construction of median and safety kerb at Km 0/9-3/8 of Southern sector of Inner Ring road.
308008.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
3,08,00 2,20,27 18,35 87,73 ...
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
Widening of culvert and minor bridge at Km 6/6 and 7/4 of Marmalong bridge Irumbuliyur road including face lifting of MRTS bridge at Km 6/0 & grade separator at Km 8/4.
450009. AS / TS / RAS:
4,50,00 52,16 2,50,00 3,97,84 ...
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
"Construction of Macro Drain in Km 0/8 - 4/0 of Pallavaram - Thoraipakkam Road. (SH-109)"
111000010. AS / TS / RAS:
111,00,00 ... ... ... 19,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
"Construction of Drain in Taramani link road fromKm 0/0- 3/2. (SH 48B)"
10750011. AS / TS / RAS:
10,75,00 ... ... ... 2,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
"Construction of Drain at Km 5/3 - 7/0 of Tambaram- Mudichur - Sriperumbudur road, (SH 110)"
12500012. AS / TS / RAS:
12,50,00 ... ... ... 2,10,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
Widening end to end and Construction of Storm Water Drain and Improvements to Vanagaram - Ambathur - Puzhal Road at Km.6/4 - 10/0.
37700013.
Thiuvallur(H) C&M Division
AS / TS / RAS:
37,70,00 32,73,92 1 10,00 4,76,93
G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.
"Construction of storm water drain at km 15/6-18/0,18/6-19/0 of Mount - Poonamallee - Avadi road (SH 55)"
27250014. AS / TS / RAS:
27,25,00 ... ... ... 5,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
78
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JD 16 02( DPC )
"Construction of Storm water drain at km 13/6-15/6 of Mount - Poonamallee - Avadi road (SH 55)"
20850015.
Thiuvallur(H) C&M Division
AS / TS / RAS:
20,85,00 ... ... ... 3,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
"Construction of R.C.C box culvert at km 18/2 (i), (ii) & 18/4and construction of storm water drain at km 18/0- 18/6 of Mount -
Poonamallee - Avadi road (SH 55)"
11200016. AS / TS / RAS:
11,20,00 ... ... ... 2,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
Construction of storm water drain and crash barrier at Km 10/0-14/6 of Vanagaram-Ambattur-Puzhal road (SH205)
34400017. AS / TS / RAS:
34,40,00 5,00,23 19,40,00 17,51,08 11,88,69
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
Construction of storm water drain from Km 7/2-8/3 and Widening of culvert at Km7/4 of Mount-Poonamallee-Avadi road(SH55)
6700018. AS / TS / RAS:
6,70,00 1,38,18 2,70,00 4,83,21 48,61
G.O.Ms.No.60/H&M.P (HW.1), dt:27.06.19
Widening end to end and Construction of Storm Water Drain cum Duct in selected stretches and Improvements to Mount - Poonamallee - Avadi Road at Km.0/0 - 5/9 and 6/8 - 7/0
40000019. AS / TS / RAS:
40,00,00 35,31,53 1 1,30,00 3,38,47
G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.
"Construction of storm water drain at km 0/0 - 2/2 of Poonamallee - Kundrathur - Pallavaram road (SH113A)"
21500020. AS / TS / RAS:
21,50,00 ... ... ... 3,00,00
G.O.Ms.No.134/H & M.P (HW.2)/dt.31.10.2020.
Widening end to end providing footbath cum drain in Kodambakkam - Sriperumadur road at Km.5/0-6/7.
9300021.
Chengalpattu (H) C&M Division
AS / TS / RAS:
9,30,00 8,79,02 1 14,25 45,88
G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016
465,14,00 123,35,75 48,85,82 56,45,70 65,08,595054 03 337 JDTOTAL -
79
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Reconstruction of Retaining wall at km 48/8 I (R/S-I) of Villupuram-Mambalapattu-Tirukoilur road (SH-7)
2001.
Villupuram (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Retaining wall at km 48/8 I (R/S-II) of Villupuram-Mambalapattu-Tirukoilur road (SH-7)
2002. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Retaining wall at km 48/8 I (L/S-I) of Villupuram-Mambalapattu-Tirukoilur road (SH-7)
2003. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Retaining wall at km 48/8 I (L/S-II) of Villupuram-Mambalapattu-Tirukoilur road (SH-7)
2004. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of culvert 1/6 of Jail Hill - Vellakkarai - Kumalankualam road (SH 138)
2005.
Cuddalore (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at Km 52/8 (ii) of Tiruvarur - Mannargudi - Muthupet road (SH202)
2006.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56810-56814 (SH63)
2007. AS / TS / RAS:
2,00 ... ... ... 2,00
80
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56814-56818 (SH63)
2008.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Km 52/10 of Tiruvarur - Mannargudi - Muthupet road (SH202)
2009. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Km 52/8 (iii) of Tiruvarur - Mannargudi - Muthupet road (SH202)
20010. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Km 52/8 (i) of Tiruvarur - Mannargudi - Muthupet road (SH202)
20011. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56818-56822 (SH63)
20012. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56822-56826 (SH63)
20013. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56826-56830 (SH63)
20014. AS / TS / RAS:
2,00 ... ... ... 2,00
81
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56830 (SH63)
20015.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall in Thanjavur - Mannargudi - Tiruthuraipoondi - Vedaranyam - Kodiyakkarai road @ Ch.56830-56834 (SH63)
20016. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 49/2 of Pollachi - Valparai road.
20017.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 39/2 (RS), 39/4 (RS), 39/6 (LS) of Pollachi - Valparai road.
20018. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 38/6 (RS), 38/10 (LS) of Pollachi - Valparai road.
20019. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 37/6 (LS), 37/10 (LS), 38/2 (LS)of Pollachi - Valparai road.
20020. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 35/6 (LS&RS), 37/2 (LS) of Pollachi - Valparai road.
20021. AS / TS / RAS:
2,00 ... ... ... 2,00
82
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Repairs to Parapet wall at km 35/2 (LS), 35/4 (LS)of Pollachi - Valparai road.
20022.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Toe wall at km 34/6 (LS) of Pollachi - Valparai road.
20023. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 48/4, 48/8, 48/10 of Pollachi - Valparai road.
20024. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 34/4 (LS), 34/8 (LS&RS), 34/10 (LS) of Pollachi - Valparai road.
20025. AS / TS / RAS:
2,00 ... ... ... 2,00
Widening culvert to km 46/2(i) of Pollachi - Valparai road.
20026. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Culvert at Km 92/2 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin (Via) Meenkarai Road
20027. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Parapet wall at km 40/6 (RS), 41/10 (LS), 43/8, 44/10 of Pollachi - Valparai road.
20028. AS / TS / RAS:
2,00 ... ... ... 2,00
83
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Repairs to Retaining wall at km 46/4 of Pollachi - Valparai road.
20029.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Breast wall at km 45/2 of Pollachi - Valparai road.
20030. AS / TS / RAS:
2,00 ... ... ... 2,00
Widening culvert to km 46/2(Ii) of Pollachi - Valparai road.
20031. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 33/6 (RS), 33/8 (LS), 34/2 (LS & RS) of Pollachi - Valparai road.
20032. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 27/8 (RS), 28/4 (LS) , 29/8 (RS) of Pollachi - Valparai road.
20033. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 31/10 (LS), 32/6 (LS), 32/10 (RS) of Pollachi - Valparai road.
20034. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Toe wall at km 31/10 (LS), of Pollachi - Valparai road.
20035. AS / TS / RAS:
2,00 ... ... ... 2,00
84
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Repairs to Parapet wall at km 31/6 (RS) of Pollachi - Valparai road.
20036.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 31/4 (LS&RS) of Pollachi - Valparai road.
20037. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 30/6 (RS), 30/10 (RS) 31/2 (RS)of Pollachi - Valparai road.
20038. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Toe wall at km 24/8 (R/s),25/6, (L/s),26/2(R/s)of Pollachi - Valparai road.
20039. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 29/10 (RS),30/2(*RS) of Pollachi - Valparai road.
20040. AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-93/710-93/720 of Ramanathapuram-Nainarkoil-Andakudi-Elayankudi-Sivagangai-Melur road (SH34)"
20041.
Madurai (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-93/700-93/710 of Ramanathapuram-Nainarkoil-Andakudi-Elayankudi-Sivagangai-Melur road (SH34)"
20042. AS / TS / RAS:
2,00 ... ... ... 2,00
85
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
"Construction of retainingwall atch-93/720-93/730 of Ramanathapuram-Nainarkoil-Andakudi-Elayankudi-Sivagangai-Melur road (SH34)"
20043.
Madurai (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 0/105-120 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20044.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/90-105 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20045. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 16110 - 16120 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20046. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 16120 - 16130(L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20047. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 16130 - 16140 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20048. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 0/120-135 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20049. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
86
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Construction of Retaining wall @ chainage 16140 - 16150 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20050.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 13/490-505 (R/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20051. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/100-115 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20052. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 11/060-11/075 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20053. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 11/075-11/090 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20054. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 13/255-13/270 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20055. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 13/285-13/300 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20056. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
87
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Construction of Protective wall at km 13/505-520 (R/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20057.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/115-130 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20058. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/055 - 070 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20059. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/070 - 085 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20060. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/085-100 (L/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20061. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 16100 - 16110 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20062. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 13/270-13/285 (L/S) of koduvilarpatti - seelayampatti road (via) S.Alagapuri (SH 228)
20063. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
88
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Construction of Retaining wall @ chainage 15820 - 15830 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20064.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 0/75-90 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20065. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 15810 - 15820 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20066. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 15800 - 15810 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20067. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 15790 - 15800 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20068. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 0/0- 15 (R/S) of Abandoned NH 220 in Veerapandi Town road(SH 220)
20069. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 15780 - 15790 (L/S) Theni - Chinnamanur road (via) Venkatachalapuram. ( SH 227)
20070. AS / TS / RAS:
2,00 ... ... ... 2,00
89
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JF Original Works - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General) Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JF 16 08( DPC )
Construction of Retainingwall at km 1/580-1/590 of Kodai-Ghat Road (SH-156)
20071.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 1/590-1/600 of Kodai-Ghat Road (SH-156)
20072. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 1/600-1/615 of Kodai-Ghat Road (SH-156)
20073. AS / TS / RAS:
2,00 ... ... ... 2,00
New Sanction
540074. AS / TS / RAS:
54,00 ... 54,00 ... ...
2,00,00 ... 1,00,00 46,00 1,00,005054 03 337 JFTOTAL -
90
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JI Comprehensive Road Infrastructure Development Programme (CRIDP) - State Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JI 16 02( DPC )
CRIDP
8218500/9813400/10564900/141082361. AS / TS / RAS:
4,270,50,36 1,180,57,65 1,197,36,19 1,253,03,00 1,157,32,00
GO.Ms.No.125,HW&MP(HF.2)dt.07.08.2018 and GO Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019. and GO Ms No.71, HW&M.P (HF.2) dept dt.18.05.2020.
4,270,50,36 1,180,57,65 1,197,36,19 1,253,03,00 1,157,32,005054 03 337 JITOTAL -
91
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JJ Improvement of vital roads in developing industrial areas through Tamil Nadu Road Infrastructure Development Corporation
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JJ 16 00( DPC )
Improvement from Four lane to Six laning of Vandalur - Wallajabad road at Km.47/0 - 63/8.
18009381.
TNRIDC
AS / TS / RAS:
180,09,38 ... 48,48,38 48,46,00 5,87,71
G.O.Ms.No.94, HW&MP(HS.1) Dept, dated:21-11-2017.
Widening and Improvement of four lane to six lane in Singaperumalkoil-Sriperumbuthur road Km 12/6 to 24/6- to Oragadam Industrial Park by TNRIDC
866500 / 10866002. AS / TS / RAS:
108,66,00 ... 1,61,00 ... 1,61,00
G.O.Ms.No.40, HW&MP Dept, dated:01--03--2011.
Improvements from four laning to six laning of SingaperumalKoil-Sriperumpudur road Km.0/6-12/6 (SH-57) for a part of development of Oragadam Industrial Corridor Project.
11500003. AS / TS / RAS:
115,00,00 ... 1,00,00 ... 1,00
GO Ms No.1, Highways (HS.1) dt02.01.2015
Widening and Improvement of Singaperumalkoil-Sriperumbuthur road and Vandalur-Walajabad Road leading to Oragadam Industrial Park by TNRIDC
2440000 / 2778000 / 3610000/-329944. AS / TS / RAS:
357,70,06 ... 13,52,02 8,64,00 10,00,00
GO Ms No.205, Highways (HW.2) dt.5.10.06 & G.O.Ms.No.48/H&M.P (HS.1)dept/28.03.12 & GO Ms No.80/H&MP (HS.1)/09.10.2017.
Improvement of roads from Four Laning to Six Laning for a length of 20.00 Km. from Vandalur to Oragadam including formation of Bye pass road to Padappai Village for a length of 3.80Km.
15781005. AS / TS / RAS:
157,81,00 ... 2,81,00 2,80,00 20,42,00
G.O.Ms.No.8, HW&MP (HS.1) Dept, dated:07--01--2016.
64 Lands 5054 03 337 JJ 64 09( DPC )
Improvement of roads from Four Laning to Six Laning for a length of 20.00 Km. from Vandalur to Oragadam including formation of Bye pass road to Padappai Village for a length of 3.80Km.
3200001.
TNRIDC
AS / TS / RAS:
32,00,00 ... 32,00,00 1 1,01
G.O.Ms.No.8, HW&MP (HS.1) Dept, dated:07--01--2016.
Widening and Improvement of Singaperumalkoil-Sriperumbuthur road and Vandalur-Walajabad Road leading to Oragadam Industrial Park by TNRIDC & G.O.Ms.No.48/H&M.P (H.S.1) dept/28.03.12.
560000 / 1868100/6830002. AS / TS / RAS:
255,11,00 ... 1 ... ...
GO Ms No.205, Highways (HW.2) dt.5.10.06 & GO Ms No.80/H&MP (HS.1)/09.10.2017.
1,206,37,44 ... 99,42,41 59,90,01 37,92,725054 03 337 JJTOTAL -
92
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JK Outer Ring Road
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JK
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JK 16 08( DPC )
Outer Ring Road (Project Support Fund) Phase-I
8642200/108140001.
TNRDC
AS / TS / RAS:
1,081,40,00 ... 204,30,98 160,26,12 169,85,82
G.O.Ms.No.32, HW&MP Department, dated:25-02-2009, G.O.Ms.No.200, HW&MP Department, dated:08-10-2009,
64 Lands 5054 03 337 JK 64 07( DPC )
Land acquisition for Outer Ring Road Project-Phase-I.
31343001.
TNRDC
AS / TS / RAS:
313,43,00 ... 1 1 1
G.O.Ms.No.42, HW&MP (HN.2) Department, dated:26-03-2013, G.O.Ms.No.97, HW&MP (HF.2) Department, dated:14-08-2015 and G.O.Ms.No.177, HW&MP (HF.2) Department, dated:13-10-2013.
1,394,83,00 ... 204,30,99 160,26,13 169,85,835054 03 337 JKTOTAL -
93
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JM Widening to four lane of Madurai Ring Road through TNRIDC
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JM
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JM 16 04( DPC )
Widening the Madurai Ring Road from double lane to four lane from 0/0 - 27/2.
80000001.
TNRIDC
AS / TS / RAS:
800,00,00 799,92,00 7,29 7,29 ...
G.O.Ms.No.76, HW&MP (HS.1) Dept, dated:25-09-2017 & G.O.Ms.No.82 HW&MP (HS.1) dept, dt.16.05.2018
64 Lands 5054 03 337 JM 64 03( DPC )
67141.
TNRIDC
AS / TS / RAS:
67,14 ... ... ... ...
800,67,14 799,92,00 7,29 7,29 ...5054 03 337 JMTOTAL -
94
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JN Comprehensive Road Infrastructure Development Programme (CRIDP) - Performance based maintenance contract
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JN
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JN 16 02( DPC )
Works of initial rectifications including widening strenthening improvement and PBMC in Virudhunagar.
577178001.
Virudhunagar (H) C&M Division
AS / TS / RAS:
5,771,78,00 1,943,69,00 940,61,00 958,31,00 1,026,38,00
PBMC - G.O.No.Ms.No.106/HW&MP/dt.26.12.2017.
5,771,78,00 1,943,69,00 940,61,00 958,31,00 1,026,38,005054 03 337 JNTOTAL -
95
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JP
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JP
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 JP 16 08( DPC )
Formationof Chennai Peripheral Ring Road Section - I & II. Connecting Ennore Port with Mahabalipuram
489900001. AS / TS / RAS:
4,899,00,00 ... ... ... 690,00,00
G.O.Ms.No.114/Highways & M.P ((EAP-II(1)) dept, dated:26.09.2020.
4,899,00,00 ... ... ... 690,00,005054 03 337 JPTOTAL -
96
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
PA Bye-Pass at Kelambakkam and Tiruporur in Rajiv Gandhi Salai with JICA Assistance - TNIPP Phase-2
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 PA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 PA 16 02( DPC )
Formation of Bye-Pass at Kelambakkam and Tiruporur in Rajiv Gandhi Salai with JICA Assistance-TNIPP Phase-2
24370001. AS / TS / RAS:
243,70,00 125,00,00 25,00,00 25,00,00 1
G.O. Ms No.67/ HW&MP Dept., (NW2) / 05.09.17
243,70,00 125,00,00 25,00,00 25,00,00 15054 03 337 PATOTAL -
97
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
PB Asian Development Bank assisted Chennai - Kanyakumari Industrial Corridor Project
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 PB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 03 337 PB 16 00( DPC )
Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase-2.
64482400(438484+4803100)1. AS / TS / RAS:
6,448,24,00 ... 500,00,00 300,00,00 800,00,00
G.O.Ms.No.28/HW&MP(HS.2)dept, dt.06.03.2018.
64 Lands 5054 03 337 PB 64 09( DPC )
Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase-2.
157409001. AS / TS / RAS:
1,574,09,00 ... 500,00,00 500,00,00 440,00,00
G.O.Ms.No.28/HW&MP(HS.2)dept, dt.06.03.2018.
8,022,33,00 ... 1,000,00,00 800,00,00 1,240,00,005054 03 337 PBTOTAL -
98
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Widening of Pipe Culvert at km 0/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR)
2001.
Cuddalore (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Culvert at km 6/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR)
2002. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Widening of Pipe Culvert at km 2/4 of Seplanatham - Kottagam Road
2003. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining Wall at Km 3/4 of Gunamangalam - Gudalaiyathur road
2004. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining Wall at Km 3/2 of Gunamangalam - Gudalaiyathur road
2005. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining Wall at Km 0/4 of Gunamangalam - Gudalaiyathur road
2006. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Drain at km3/2 (iii)of Meliruppu – Athirikuppam – Perperiyankuppam Road
2007. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
99
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Drain at km3/2(iv) of Meliruppu – Athirikuppam – Perperiyankuppam Road
2008.
Cuddalore (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Drain at km3/2(ii) of Meliruppu – Athirikuppam – Perperiyankuppam Road
2009. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Drain at km3/2 (i)of Meliruppu – Athirikuppam – Perperiyankuppam Road
20010. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Widening of culvert at km 0/4 of Chennai-Thiruchi-Dindugal road to Korakkai road
20011. AS / TS / RAS:
2,00 ... 2,00 ... ...
Construction of Retaining wall at Km.44/10 (L/S) of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20012.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at ch.48/994 -49/0 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20013. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Km.44/10 (R/S) of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20014. AS / TS / RAS:
2,00 ... ... ... 2,00
100
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retaining wall at Ch.48/940-48/946 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20015.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.48/952-48/958 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20016. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.48/958-48/964 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20017. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at ch.48/964-48/970 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20018. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.48/970-48/976 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20019. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.48/976-48/982 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20020. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.48/946-48/952 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20021. AS / TS / RAS:
2,00 ... ... ... 2,00
101
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retaining wall at ch.48/988-48/994 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20022.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at ch.49/0-49/006 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20023. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.49/006-49/012 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20024. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.49/012-49/018 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20025. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at ch.48/982-48/988 of Mayiladuthurai - Tiruthuraipoondi Road (SH23)
20026. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH: 62/990-63/00 of Avinashi-Tiruppur-Palladam-Pollachi-Cochin(via) Meenkarai road
20027.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH: 63/00-63/013 of Avinashi-Tiruppur-Palladam-Pollachi-Cochin(via) Meenkarai road
20028. AS / TS / RAS:
2,00 ... ... ... 2,00
102
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Reconstruction of Damaged Retaining wall at CH: 62/970-62/980 of Avinashi-Tiruppur-Palladam-Pollachi-Cochin(via) Meenkarai road
20029.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH: 62/980-62/990 of Avinashi-Tiruppur-Palladam-Pollachi-Cochin(via) Meenkarai road
20030. AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-4462-4472 of Thumbaipatty- Jeyankondanilairoad (M-959) Right side"
20031.
Madurai (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
"Providing RCC Crash barrier type parapet at Km6/10minor bridge of Melur-Thirupuvanam (via) poovanthi road"
20032. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/330 - 3/340 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20033.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retainingwall at km 4/160-4/180 of Kodai-Ghat Road (SH-156)
20034. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/310 - 3/320 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20035. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
103
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retaining wall at km 9/896 - 9/902 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20036.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/890 - 9/896 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20037. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/884 - 9/890 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20038. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/878 - 9/884 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20039. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/872 - 9/878 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20040. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/866 - 9/872 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20041. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/860 - 9/866 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20042. AS / TS / RAS:
2,00 ... ... ... 2,00
104
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retaining wall at km 9/854 - 9/860 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20043.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/848 - 9/854 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20044. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/908 - 9/914 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20045. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/180-4/200 of Kodai-Ghat Road (SH-156)
20046. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/914 - 9/920 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20047. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/140-4/160 of Kodai-Ghat Road (SH-156)
20048. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/120-4/140 of Kodai-Ghat Road (SH-156)
20049. AS / TS / RAS:
2,00 ... ... ... 2,00
105
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retainingwall at km 4/100-4/120 of Kodai-Ghat Road (SH-156)
20050.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/080-4/100 of Kodai-Ghat Road (SH-156)
20051. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/060-4/080 of Kodai-Ghat Road (SH-156)
20052. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/040-4/060 of Kodai-Ghat Road (SH-156)
20053. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/020-4/040 of Kodai-Ghat Road (SH-156)
20054. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 4/000-4/020 of Kodai-Ghat Road (SH-156)
20055. AS / TS / RAS:
2,00 ... ... ... 2,00
Widening Culvert at km 16/10 of Kodai-Ghat Road (SH-156)
20056. AS / TS / RAS:
2,00 ... ... ... 2,00
106
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retainingwall at km 1/645-1/660 of Kodai-Ghat Road (SH-156)
20057.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 1/630-1/645 of Kodai-Ghat Road (SH-156)
20058. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/842 - 9/848 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20059. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/300 - 3/310 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20060. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retainingwall at km 1/615-1/630 of Kodai-Ghat Road (SH-156)
20061. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/250 - 3/260 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20062. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 3/260 - 3/270 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20063. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
107
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retaining wall at km 3/270 - 3/280 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20064.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 9/902 - 9/908 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20065. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/290 - 3/300 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20066. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 3/320 - 3/330 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20067. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 3/340 - 3/350 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20068. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 9/926 - 9/932 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20069. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/610 - 4/620 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20070. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
108
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JB Bridges - Original Works/Rehabilitation of Distressed Bridges - Lumpsum Provision for New Works sanctioned within the powers
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 101 JB 16 04( DPC )
Construction of Retaining wall at km 4/620 - 4/630 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20071.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/630 - 4/640 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20072. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/640 - 4/650 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20073. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/600 - 4/610 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20074. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 9/920 - 9/926 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20075. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/280 - 3/290 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20076. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
New Sanction
480077. AS / TS / RAS:
48,00 ... 48,00 ... ...
2,00,00 ... 1,00,00 50,00 1,00,005054 04 101 JBTOTAL -
109
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JE High density corridor
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JE 16 09( DPC )
Improvements at Km.1/2-1/850 and providing CC pavement at Km.1/2-1/4 of Velachery bypass.
286001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
2,86,00 1,37,71 25,00 ... ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Widening avalable width and improvements at Km.2/5-5/4 and providing drain and foot path in selected stretches at Km.2/5-5/4 of GST loop road.
983002. AS / TS / RAS:
9,83,00 7,01,65 25,00 ... ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Providing foot path and improvements in selected stretches at Km.0/6-2/3 of Nanganallur road.
326003. AS / TS / RAS:
3,26,00 1,39,75 25,00 ... ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Providing Drain, footpath in selected strtches at Km.0/6-3/7 of Mount - Medavakkam road.
800004. AS / TS / RAS:
8,00,00 6,26,22 ... 1,73,78 ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Improvements toTaramani- Perungudi Road at Km.0/0-0/7(RS) including Construction of drain cum footpath
195005. AS / TS / RAS:
1,95,00 1,62,06 15,21 32,94 ...
G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.
Improvement to Medavakkam - Sholinganallur road at Km. 0/0-2/6 & 3/5-4/5.
2300006. AS / TS / RAS:
23,00,00 20,44,28 25,00 ... ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Providing pavement with block and constructionof Storm water drain in K.S.Road to MPA Road (via) Valluvar Nagar to Ramapuram Km0/0-1/4.
820007.
Thiuvallur(H) C&M Division
AS / TS / RAS:
8,20,00 7,85,25 1 34,75 ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
110
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JE High density corridor
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JE 16 09( DPC )
Widening IL to DL , impts in Km.0/0-3/4 of AVP road to Manali-Mathur road(via) kosapur road including Constructionof Storm water drain at Km 0/0-2/0
950008.
Thiuvallur(H) C&M Division
AS / TS / RAS:
9,50,00 3,77,40 4,50,00 4,53,44 1,19,16
G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.
Constructionof Storm water drain and providing pavereblock end to end in Km0/0-1/8 of oragadam Road .
258009. AS / TS / RAS:
2,58,00 88,36 1,58,00 1,60,00 9,64
G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.
Providing paver block end to end and Constructionof Storm water drain cum footpath from Km0/0-1/0 of Valasaravakkam-Ramapuram Road (via) Valluvar Nagar (MD 1020) .
4300010. AS / TS / RAS:
4,30,00 2,05,30 1,30,00 2,10,00 14,70
G.O.Ms.No.60/H&M.P (HW.1)/dt.27.06.2019.
Improvements in Chennai- Kodampakkam- Sriperumbudur road to Mugalivakkam road inculding paved shoulders and drain cum foorpath in Km.0/0-2/3.
7050011.
Chengalpattu (H) C&M Division
AS / TS / RAS:
7,05,00 6,10,81 ... 6,78 ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Providing paved shoulder in Kodambakkam - Sriperumbudur road to Manapakkam (via) Kolapakkam at 3/2-5/6 (MDR1026) right side only.
2150012. AS / TS / RAS:
2,15,00 1,55,00 ... 1 ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
Improvement mount Poonmallee road to Mugalivakkam Km0/7-1/0 including providing drain cum footpath and paved shoulders in Km0/0-1/0.
1000013. AS / TS / RAS:
1,00,00 86,90 ... 4,94 ...
G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.
83,68,00 61,20,69 8,53,22 10,76,64 1,43,505054 04 337 JETOTAL -
111
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Raising the Dip portion at Km.6/2 of Moratandy-Bommiyapalayam road(MD-1115)
2001.
Villupuram (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at Ch.12/511-12/517 of Kodavasal - Valangaiman - Papanasam road
2002.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/475-12/481 of Kodavasal - Valangaiman - Papanasam road
2003. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/602-16/608 of Thirunellikaval - Kolappadu - Karunganni road
2004. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/608-16/614 of Thirunellikaval - Kolappadu - Karunganni road
2005. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/614 -16/620 of Thirunellikaval - Kolappadu - Karunganni road
2006. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/620 -16/626 of Thirunellikaval - Kolappadu - Karunganni road
2007. AS / TS / RAS:
2,00 ... ... ... 2,00
112
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retaining wall at Ch.16/626 -16/632 of Thirunellikaval - Kolappadu - Karunganni road
2008.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/632 -16/638 of Thirunellikaval - Kolappadu - Karunganni road
2009. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/523-12/529 of Kodavasal - Valangaiman - Papanasam road
20010. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/644 -16/650 of Thirunellikaval - Kolappadu - Karunganni road
20011. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/517-12/523 of Kodavasal - Valangaiman - Papanasam road
20012. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/481-12/487 of Kodavasal - Valangaiman - Papanasam road
20013. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/487-12/493 of Kodavasal - Valangaiman - Papanasam road
20014. AS / TS / RAS:
2,00 ... ... ... 2,00
113
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retaining wall at Ch.12/493-12/499 of Kodavasal - Valangaiman - Papanasam road
20015.
Thiruvarur (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/499-12/505 of Kodavasal - Valangaiman - Papanasam road
20016. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.12/505-12/511 of Kodavasal - Valangaiman - Papanasam road
20017. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at Ch.16/638 -16/644 of Thirunellikaval - Kolappadu - Karunganni road
20018. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Culvert at Km 13/817 R/S of Anaimalai - Poolankinar road.
20019.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs retaining wall in km 7/9(v) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20020. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Parapet wall at km 5/10, 6/2, 6/4 of of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20021. AS / TS / RAS:
2,00 ... ... ... 2,00
114
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Reconstruction of Pipe Culvert at Km 4/6 of Senjerihills-Vadachittor(Via) Mettulakshinaickenpalayam road(M 881) Road (M 417)
20022.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Box Culvert at Km 15/2 of Ambarampalayam - Sethumadai road
20023. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 13/6 R/S of Ambarampalayam - Sethumadai road.
20024. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 13/6 L/S of Ambarampalayam - Sethumadai road.
20025. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Culvert at km 0/10 of Samathur - Devanurpudur road
20026. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs retaining wall in km 7/9(i) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20027. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs retaining wall in km 7/9(ii) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20028. AS / TS / RAS:
2,00 ... ... ... 2,00
115
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Repairs retaining wall in km 7/9(iii) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20029.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs retaining wall in km 7/9(iv) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20030. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Culvert at Km 13/817 L/S of Anaimalai - Poolankinar road.
20031. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Retaining Wall at Km 2/8 R/S of Anaimalai - Poolankinar road. 15.00 m
20032. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Retaining Wall at Km 2/8 L/S of Anaimalai - Poolankinar road. 15.00 m
20033. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Retaining Wall at Km 2/6 R/S of Anaimalai - Poolankinar road. 15.00 m
20034. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs retaining wall in km 4/8 of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20035. AS / TS / RAS:
2,00 ... ... ... 2,00
116
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Repairs to Pipe Culvert at Km 14/900 of Anaimalai - Poolankinar road.
20036.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Widening Slab culvert in km 4/8(ii) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20037. AS / TS / RAS:
2,00 ... ... ... 2,00
Widening Slab culvert in km 4/8(i) of Permanent Diversion from old valparai to state border connecting Pollachi Main road
20038. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Pipe Culvert at Km 6/6 of Senjerihills-Vadachittor(Via) Mettulakshinaickenpalayam road(M 881) Road (M 417)
20039. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Retaining Wall at Km 2/6 L/S of Anaimalai - Poolankinar road. 15.00 m
20040. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
"Construction of retainingwall atch-4446-4456 of Thumbaipatty- Jeyankondanilairoad (M-959) Right side"
20041.
Madurai (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-4320-4330 of Thumbaipatty- Jeyankondanilairoad (M-959) Left side"
20042. AS / TS / RAS:
2,00 ... ... ... 2,00
117
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
"Construction of retainingwall atch-4330-4340 of Thumbaipatty- Jeyankondanilairoad (M-959) Left side"
20043.
Madurai (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-4436-4446 of Thumbaipatty- Jeyankondanilairoad (M-959) Left side"
20044. AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-4436-4446 of Thumbaipatty- Jeyankondanilairoad (M-959) Left side"
20045. AS / TS / RAS:
2,00 ... ... ... 2,00
"Construction of retainingwall atch-4446-4456 of Thumbaipatty- Jeyankondanilairoad (M-959) Left side"
20046. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 830 - 840 (R/S) Kottur - Kamatchipuram road. ( M 1185)
20047.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 4/060-4/075(R/S) of veerapandi - seeapalakottai road (M 735)
20048. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 800 - 810 (R/S) Kottur - Kamatchipuram road. ( M 1185)
20049. AS / TS / RAS:
2,00 ... ... ... 2,00
118
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retaining wall @ chainage 810 - 820 (R/S) Kottur - Kamatchipuram road. ( M 1185)
20050.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 5/755 - 5/770(R/S) of veerapandi - seeapalakottai road (M 735)
20051. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 5/785-5/800(R/S) of veerapandi - seeapalakottai road (M 735)
20052. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 5/800-5/815(R/S) of veerapandi - seeapalakottai road (M 735)
20053. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 5/815-5/830(R/S) of veerapandi - seeapalakottai road (M 735)
20054. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 5/830 - 5/845 (R/S) of veerapandi - seeapalakottai road (M 735)
20055. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 5/845 - 5/860 (R/S) of veerapandi - seeapalakottai road (M 735)
20056. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
119
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Protective wall at km 5/10 (R/S) of veerapandi - seeapalakottai road (M 735)
20057.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 2/10 of kottur - kamatchipuram road (M 1186)
20058. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/625-0/640(R/S) of veerapandi - seeapalakottai road (M 735)
20059. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 3/2(ii) of kottur - kamatchipuram road (M 1186)
20060. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/955-0/970 (R/S) of veerapandi - seeapalakottai road (M 735)
20061. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 5/740 - 5/755(R/S) of veerapandi - seeapalakottai road (M 735)
20062. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 4/4 of veerapandi - seeapalakottai road (M 735)
20063. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
120
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Protective wall at km 4/090-4/105(R/S) of veerapandi - seeapalakottai road (M 735)
20064.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 4/075-4/090(R/S) of veerapandi - seeapalakottai road (M 735)
20065. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 1/2 (L/S) of veerapandi - seeapalakottai road (M 735)
20066. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/610-0/625(R/S) of veerapandi - seeapalakottai road (M 735)
20067. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/970-0/985 (R/S) of veerapandi - seeapalakottai road (M 735)
20068. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 3/2(i) of kottur - kamatchipuram road (M 1186)
20069. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 820 - 830 (R/S) Kottur - Kamatchipuram road. ( M 1185)
20070. AS / TS / RAS:
2,00 ... ... ... 2,00
121
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Protective wall at km 5/770-5/785(R/S) of veerapandi - seeapalakottai road (M 735)
20071.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 840 - 850 (R/S) Kottur - Kamatchipuram road. ( M 1185)
20072. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 855 - 865 (L/S) Kottur - Kamatchipuram road. ( M 1185)
20073. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 894 - 904 (L/S) Kottur - Kamatchipuram road. ( M 1185)
20074. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 904 - 914 (L/S) Kottur - Kamatchipuram road. ( M 1185)
20075. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 0/940-0/955 (R/S) of veerapandi - seeapalakottai road (M 735)
20076. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 32/210 - 32/220 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20077.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
122
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retaining wall at km 32/220 - 32/230 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20078.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 32/230 - 32/240 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20079. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 32/240 - 32/250 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20080. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/290- 29/300 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20081. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 32/250 - 32/260 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20082. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/280- 29/290 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20083. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retainingwall at km 24/800-820 of Natchikulam -Sempatty Road (MD-643)
20084. AS / TS / RAS:
2,00 ... ... ... 2,00
123
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retainingwall at km 24/870-24/890 of Natchikulam -Sempatty Road (MD-643)
20085.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 29/220- 29/230 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20086. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retainingwall at km 24/890-24/910 of Natchikulam -Sempatty Road (MD-643)
20087. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 24/910-24/930 of Natchikulam -Sempatty Road (MD-643)
20088. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 24/930-24/950 of Natchikulam -Sempatty Road (MD-643)
20089. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 24/850-24/870 of Natchikulam -Sempatty Road (MD-643)
20090. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retainingwall at km 24/835-24/850 of Natchikulam -Sempatty Road (MD-643)
20091. AS / TS / RAS:
2,00 ... ... ... 2,00
124
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retainingwall at km 24/820-24/835 of Natchikulam -Sempatty Road (MD-643)
20092.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 32/200 - 32/210 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20093. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/210- 29/220 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20094. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/230- 29/240 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20095. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/240- 29/250 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20096. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/250- 29/260 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20097. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/260- 29/270 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20098. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
125
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JG Major District Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JG 16 05( DPC )
Construction of Retaining wall at km 29/270- 29/280 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
20099.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 29/200- 29/210 of Melur - samuthiurapatti - kottaiyur - Aravankurichi road (MD 892)
200100. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
2,00,00 ... 1,00,00 1,00,00 1,00,005054 04 337 JGTOTAL -
126
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Providing CC Pavement of Kandampakkam-Maragathapuram road at km 3/8 (East side)
2001.
Villupuram (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of culvert at Km.3/4 Vellimedupettai –Puthur Road
2002. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Retaining wall at km 1/2 (L/S-I) of Vikkravandy-Reddikuppam road
2003. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Providing CC Pavement of Kandampakkam-Maragathapuram road at km 3/8(South side)
2004. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Retaining wall at km 3/10 (R/S-I) of Nemur-Esalam road
2005. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Retaining wall at km 3/10 (R/S-II) of Nemur-Esalam road
2006. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of culvert at Km. 2/8 Vellimedupettai –Puthur Road
2007. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
127
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Reconstruction of Retaining wall at km 1/2 (L/S-II) of Vikkravandy-Reddikuppam road
2008.
Villupuram (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of culvert at Km. 1/6 Pelakuppam Road
2009. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of culvert at Km. 1/2-2/8 Vellimedupettai –Puthur Road
20010. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Raising the dip at km 1/4 of The road from km 8/4 of Cuddalore - Chittoor road joints at km 7/10 of Cuddalore - Thirukoilur - Sankarapuram (via) Karamanikuppam
20011.
Cuddalore (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Raising the dip at km 1/2 of The road from km 8/4 of Cuddalore - Chittoor road joints at km 7/10 of Cuddalore - Thirukoilur - Sankarapuram (via) Karamanikuppam
20012. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of culvert 10/6 of Thookkanampakkam - Keelkumaramangalam - Reddichavadi road
20013. AS / TS / RAS:
2,00 ... 2,00 ... ...
Reconstruction of culvert 1/8 of Devanampattinam road
20014. AS / TS / RAS:
2,00 ... 2,00 ... ...
128
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Widening of Pipe Culvert at km 0/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR)
20015.
Cuddalore (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 ... ...
Widening of Pipe Culvert at km 2/4 of Seplanatham - Kottagam Road
20016. AS / TS / RAS:
2,00 ... 2,00 ... ...
Widening of culvert at km 0/4 of Chennai-Thiruchi-Dindugal road to Korakkai road
20017. AS / TS / RAS:
2,00 ... 2,00 ... ...
Repairs to Culvert at km 6/10 of Pennadam-Vridhachalam road and Uchimedu link road (SCR)
20018. AS / TS / RAS:
2,00 ... 2,00 ... ...
Reconsrtuction of Culvrt at km 3/0 of Km.109/4 of Dindugal - Bangalore Road to Kanjampatti
20019.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 6/10 R/S of Uthukkuli - Thappattaikelavanputhur road
20020. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconsrtuction of Culvrt at km 0/2 of Km.1/2 of Samathur - Devanurpudur Road to join at Km.7/4 of Pollachi - Valparai Road (via) Ponnachiyur.
20021. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
129
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Reconstruction of Damaged Retaining wall at CH 3/972 - 3/985 of Mullupadi - Sirukalandai road.
20022.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Pipe Culvert at Km 5/2 of Kottur - Thenkaiparai road to Pongaliyur.
20023. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Culvert at Km 2/8 of Kottur - Thenkaiparai road to Pongaliyur.
20024. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Retaining Wall at km 2/6 L/S of Anaimalai - Periyapothu road. 15.00 m
20025. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Retaining Wall at km 2/6 R/S of Anaimalai - Periyapothu road. 15.00 m
20026. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 0/10 R/S of Ponnayur - Singanallur Road
20027. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Bodywall at km 4/10 of Edaiyarpalayam - Panappatty road
20028. AS / TS / RAS:
2,00 ... ... ... 2,00
130
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Repairs to Pipe Culvert at Km 0/10 L/S of Ponnayur - Singanallur Road
20029.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Damaged Retaining wall at CH 3/959 - 3/972 of Mullupadi - Sirukalandai road.
20030. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH 3/946 - 3/959 of Mullupadi - Sirukalandai road.
20031. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH 3/933 - 3/946 of Mullupadi - Sirukalandai road.
20032. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH 3/920 - 3/933 of Mullupadi - Sirukalandai road.
20033. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH 1/779 - 1/792 of Mullupadi - Sirukalandai road.
20034. AS / TS / RAS:
2,00 ... ... ... 2,00
Reconstruction of Damaged Retaining wall at CH 1/766 - 1/779 of Mullupadi - Sirukalandai road.
20035. AS / TS / RAS:
2,00 ... ... ... 2,00
131
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Reconstruction of Damaged Retaining wall at CH 1/753 - 1/766 of Mullupadi - Sirukalandai road.
20036.
Pollachi (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Pipe Culvert at Km 1/8 of Uthukkuli - Thappattaikelavanputhur road
20037. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Reconstruction of Damaged Retaining wall at CH 1/740 - 1/753 of Mullupadi - Sirukalandai road.
20038. AS / TS / RAS:
2,00 ... ... ... 2,00
Repairs to Pipe Culvert at Km 1/4 of ATPPC Road to Manakkadavu.
20039. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 1/6 of Uthukkuli - Thappattaikelavanputhur road
20040. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 7/0 of Anaimalai - Periyapothu road
20041. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Repairs to Pipe Culvert at Km 6/10 L/S of Uthukkuli - Thappattaikelavanputhur road
20042. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
132
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall @ chainage 3700 - 3710 (L/S) of Thadicheri - Veerapandi road.
20043.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3710 - 3720 (L/S) of Thadicheri - Veerapandi road.
20044. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3720 - 3730 (L/S) of Thadicheri - Veerapandi road.
20045. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 1/765-780 of Thappugundu - Poomalaigundu road
20046. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/0 - 0/015 (R/S)of venkatachalapuram - kattunaickanpatti road
20047. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 4/570-4/585 (R/S) of Aranmanaipudur - vayalpatti road
20048. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 4/585 - 4/600 (R/S) of Aranmanaipudur - vayalpatti road
20049. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
133
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Protective wall at km 0/5 - 0/20 of Ayyanarpuram Balakrishnapuram road
20050.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 0/20 - 0/35 of Ayyanarpuram Balakrishnapuram road
20051. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 3/6 (R/S) of Thadicheri - veerapandi road
20052. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 1/750-765 of Thappugundu - Poomalaigundu road
20053. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 1/780-795 of Thappugundu - Poomalaigundu road
20054. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 1/910 -1/920 of Thappugundu - Poomalaigundu road
20055. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Protective wall at km 1/920 -1/930 of Thappugundu - Poomalaigundu road
20056. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
134
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Protective wall at km 1/930 -1/940 of Thappugundu - Poomalaigundu road
20057.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall @ chainage 3640 - 3650 (L/S) of Thadicheri - Veerapandi road.
20058. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3650 - 3660 (L/S) of Thadicheri - Veerapandi road.
20059. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3660 - 3670 (L/S) of Thadicheri - Veerapandi road.
20060. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3670 - 3680 (L/S) of Thadicheri - Veerapandi road.
20061. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3680 - 3690 (L/S) of Thadicheri - Veerapandi road.
20062. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 3690 - 3670 (L/S) of Thadicheri - Veerapandi road.
20063. AS / TS / RAS:
2,00 ... ... ... 2,00
135
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall @ chainage 2480 - 2490 (L/S) of Thadicheri - Veerapandi road.
20064.
Theni (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall @ chainage 2490 - 2500 (L/S) of Thadicheri - Veerapandi road.
20065. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Protective wall at km 0/015 - 0/030 (R/S)of venkatachalapuram - kattunaickanpatti road
20066. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/762 - 4/768 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20067.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/714 - 4/720 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20068. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/240 - 3/250 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20069. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/750 - 4/756 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20070. AS / TS / RAS:
2,00 ... ... ... 2,00
136
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall at km 4/744 - 4/750 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20071.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/738 - 4/744 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20072. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/732 - 4/738 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20073. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/768 - 4/774 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20074. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/720 - 4/726 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20075. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/836 - 9/842 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20076. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/708 - 4/714 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20077. AS / TS / RAS:
2,00 ... ... ... 2,00
137
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall at km 4/702 - 4/708 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20078.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/690 - 4/696 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20079. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 3/210 - 3/220 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20080. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 3/220 - 3/230 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20081. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 3/230 - 3/240 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20082. AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/726 - 4/732 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20083. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/810 - 4/816 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20084. AS / TS / RAS:
2,00 ... ... ... 2,00
138
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall at km 9/818 - 9/824 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20085.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/812 - 9/818 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20086. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/806 - 9/812 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20087. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/800 - 9/806 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20088. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/822 - 4/828 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20089. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/756 - 4/762 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20090. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/774 - 4/780 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20091. AS / TS / RAS:
2,00 ... ... ... 2,00
139
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall at km 3/200 - 3/210 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20092.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... 2,00 2,00 ...
Construction of Retaining wall at km 4/798 - 4/804 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20093. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/792 - 4/798 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20094. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/824 - 9/830 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20095. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/786 - 4/792 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20096. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 9/830 - 9/836 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20097. AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/780 - 4/786 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20098. AS / TS / RAS:
2,00 ... ... ... 2,00
140
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JH District and Other Roads - Lumpsum Provision for New Works sanctioned within the powers of Chief Engineer (General)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JH 16 03( DPC )
Construction of Retaining wall at km 4/816 - 4/822 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
20099.
Dindigul (H) C&M Division
AS / TS / RAS:
2,00 ... ... ... 2,00
Construction of Retaining wall at km 4/696 - 4/702 of Dindigul - Karaikudi road to Dindigul - Siluvathur road via veerachinampatti.
200100. AS / TS / RAS:
2,00 ... ... ... 2,00
2,00,00 ... 1,00,00 88,00 1,00,005054 04 337 JHTOTAL -
141
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JP Improvements to Chennai Radial Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JP
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JP 16 07( DPC )
Payments towards L.A Compensation
01.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
... ... 1 1 1
... ... 1 1 15054 04 337 JPTOTAL -
142
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JT Comprehensive Road Infrastructure Development Programme (CRIDP) - Major District Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JT 16 09( DPC )
CRIDP
5638500/6079400/8675600/100885311. AS / TS / RAS:
3,048,20,31 76,84,30 847,91,97 882,71,00 809,16,00
G.O Ms No.125, HW&M.P (HF.2) dept dt.07.08.2018, G.O Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019, G.O Ms No.71, HW&M.P (HF.2) dept dt.18.05.2020.
3,048,20,31 76,84,30 847,91,97 882,71,00 809,16,005054 04 337 JTTOTAL -
143
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JU Comprehensive Road Infrastructure Development Programme (CRIDP) - Other District Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JU
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 JU 16 07( DPC )
CRIDP
11549500/11459200/13102300/180517451. AS / TS / RAS:
5,416,27,45 1,424,05,91 1,650,94,84 1,658,82,00 1,488,75,00
G.O Ms No.125, HW&M.P (HF.2) dept dt.07.08.2018, G.O Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019, G.O Ms No.71, HW&M.P (HF.2) dept dt.18.05.2020.
5,416,27,45 1,424,05,91 1,650,94,84 1,658,82,00 1,488,75,005054 04 337 JUTOTAL -
144
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KB Schemes implemented under State Infrastructure and Amenities Fund - Controlled by Chief Engineer (Construction and
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KB 16 04( DPC )
Widening of Ramanaickaneri Tank Bund portion in Km.0/0-0/7 of Hosur-Denkanikottai road (via) Thally (0/0-42/2)
899001.
Krishnagiri (H) C&M Division
AS / TS / RAS:
8,99,00 7,00,38 1 1,28,61 70,01
G.O.Ms.No.91/HW&MP(HQ.1), dt.28.05.2018.
Widening from end to end at Km.0/0-1/3 and providing drain cumfoot path in Km.0/0-1/3 of Hosur Town to Hosur Railway station road.
390002. AS / TS / RAS:
3,90,00 3,08,98 1 81,02 ...
G.O.Ms.No.91/HW&MP(HQ.1), dt.28.05.2018.
Improvements to the Junction at Km.39/6 of Varanasi-Kaniyakumari road, Hosur town limit.
70003. AS / TS / RAS:
70,00 59,63 1 10,37 ...
G.O.Ms.No.91/HW&MP(HQ.1), dt.28.05.2018.
Widening from double lane to to four lane and strengthening in Km.4/4-6/8 and 12/4-15/0 of Madurai-Alagakoil-Melur road including Bus lay-byes, reconstruction/widening of culverts and minor bridges, construction of retaining wall drain.
1500004.
Madurai (H) C&M Division
AS / TS / RAS:
20,00,00 16,78,09 1 3,21,91 ...
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
widening from Double lane to Multilane and Strengthening of Madurai-Thondi road at Km.3/6-10/0 including Reconstruction/Widening of culverts and minor bridges construction or retaining wall and drain.
1500005. AS / TS / RAS:
15,00,00 12,41,66 1 2,58,34 ...
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
Widening from Double lane to Multilane and Improvements at Km.0/0-2/8 of Theni byepass road including junction improvements at Km.0/2, construction of drain at Km.0/2, widening the existing slab culvert at Km.0/4.
353006.
Theni (H) C&M Division
AS / TS / RAS:
3,53,00 1,78,45 1 1,46,00 26,85
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
Improvemets of Devathanapatty-Varusanadu road at Km.20/0-21/0 and Km.45/0-46/4 including construction of drainage at Km.19/10,20/2 and 45/6,45/8,45/10 and reconstruction of culvert at Km.45/8.
205007. AS / TS / RAS:
2,05,00 2,04,56 1 ... ...
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
145
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KB Schemes implemented under State Infrastructure and Amenities Fund - Controlled by Chief Engineer (Construction and
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KB 16 04( DPC )
Improvements of Theni-Chinnamanur road (via) Venkatachalapuram at Km.20/0-23/0 including construction of retaining wall and drain.
200008.
Theni (H) C&M Division
AS / TS / RAS:
2,00,00 2,00,00 1 ... ...
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
Improvements of Palayam-Bodi road at Km.12/2-14/0, Km.24/900-25/8 including widening at Km.12/2-12/6 and construction of drainage at Km.24/6, 24/8 and 25/4.
235009. AS / TS / RAS:
2,35,00 2,30,01 1 ... ...
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
Widening and Improvement of Karaikudi College Campus road at Km.3/2-6/435 including construction of centre median.
6500010.
Sivaganga (H) C&M Division
AS / TS / RAS:
6,50,00 6,48,30 ... 1,70 ...
G.O.Ms.No.90/HW&MP(HS.1), dt.28.05.2018.
65,02,00 54,50,06 9 9,47,95 96,865054 04 337 KBTOTAL -
146
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KC Acquisition of Lands for Bye Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KC 16 02( DPC )
Formation of byepass road to Manachanallur town
2215001.
Trichy (H) C&M Division
AS / TS / RAS:
22,15,00 ... 5,00,00 25,15,00 2,15,00
G.O.Ms.No.54, Highways and Minor Ports (HP.2) Department, dated:13-06-2019.
Formation of Bye pass road to Illuppur town in Km.0/0-5/4 in Pudukottai District.
2147002.
Pudukottai (H) C&M Division
AS / TS / RAS:
21,47,00 ... 15,00,00 3,04,00 11,47,00
G.O.Ms.No.53, Highways and Minor Ports (HP.1) Department, dated:04-03-2016.
Construction of Fly over along Athupalam and Ukkadam juntion up to Oppanakara Street in Coimbatore City
12182003.
Coimbatore (H) C&M Division
AS / TS / RAS:
121,82,00 72,10,07 45,24,57 19,81,00 34,71,92
G.O.Ms.No.59, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.
Extension of Flyover along Athupalam & Ukkadam upto Oppanakkara street in Coimbatore city
19544004. AS / TS / RAS:
195,44,00 ... 1 10,00,00 85,44,00
G.O.Ms.No.163, HW&MP (HS.2), dt:19.12.2019
Formation of Eastern Bye pass to Pollachi town starting from Thippampatty at Km.111/4 of NH-209 and ending Achipatty @ km.124/8 of NH-209 (Via) Alampalayam, Rasakkapalaya, Kullakkapalaym to a length of 15.40 km.
2063005.
Pollachi (H) C&M Division
AS / TS / RAS:
20,63,00 20,63,00 1 ... 1
G.O.Ms.No.61, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.
64 Lands 5054 04 337 KC 64 01( DPC )
Land Acquisition for the formation of Ring Road to Vellore
3882001.
Vellore (H) C&M Division
AS / TS / RAS:
38,82,00 9,95,09 15,00,00 21,00,00 5,00,00
G.O.Ms.No.29, Highways and Minor Ports (HQ.2) Department, dated:12-04-2017.
147
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KC Acquisition of Lands for Bye Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 04 337 KC 64 01( DPC )
Land aquisition for formation of Kumbakonam bypass in Km.0/0-9/420 Phase.II in Thanjavur Dt.
2800002.
Thanjavur (H) C&M Division
AS / TS / RAS:
28,00,00 12,02 10,00,00 10,00,00 1
G.O.Ms.No.135, Highways and Minor Ports (HP.2) Department, dated:26-11-2015.
Land aquisition for formation of bypass to Thirukkattupalli town.
418003. AS / TS / RAS:
4,18,00 ... 3,68,00 ... ...
Land aquisition for formation of bypass to Valaingaima town in Tiruvarur Dt.
314004.
Thiruvarur (H) C&M Division
AS / TS / RAS:
3,14,00 20,24 2,74,00 2,74,00 19,76
G.O.Ms.No.136, Highways and Minor Ports (HP.2) Department, dated:26-11-2015.
Land Acquisition for the work of formation Athur bypass (Phase-I)
2947005.
Salem (H) C&M Division
AS / TS / RAS:
29,47,00 ... ... 50,00 28,79,24
GO Ms No.76, Highways(HP.1)dept/dt.08.06.2020.
Land aquisition for formation of Outer Ring Road to Hosur Town.
12496006.
Krishnagiri (H) C&M Division
AS / TS / RAS:
124,96,00 1,25,00 ... 30,00,00 84,00,00
G.O.Ms.No.102, Highways and Minor Ports (HQ.2) Department, dated:20-12-2017.
Extension of Flyover along Athupalam & Ukkadam upto Oppanakkara street in Coimbatore city
7000007.
Coimbatore (H) C&M Division
AS / TS / RAS:
70,00,00 ... 1 10,00,00 60,00,00
G.O.Ms.No.163, HW&MP (HS.2), dt:19.12.2019
Land aquisition for the formation of Bye pass to Mettupalayam town.
9935008. AS / TS / RAS:
99,35,00 32,19 20,00,00 3,87,98 1,02,80
G.O.Ms.No.46, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.
148
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KC Acquisition of Lands for Bye Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 04 337 KC 64 01( DPC )
Land aquisition for formation of Western Ring road to Coimbatore city..
32000009.
Coimbatore (H) C&M Division
AS / TS / RAS:
320,00,00 1,19,00 25,00,00 174,00,00 118,00,00
G.O.Ms.No.52, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.
Acquisition of land for the work of Improvements of roads connecting Airport with Mettupalayam Town. Phase-I
26724910. AS / TS / RAS:
26,72,49 ... ... 10,00,00 16,72,49
G.O.Ms.No.216, HW&MP (HS.2), dt:21.12.2018.
Land aquisition for the widening and ground level improvement of Dindigul Bangalore road (NH-209), Pollachi Palaghat road (SH-78A), Municipal bus route road (ODR) and new scheme road (Pollachi Municipal road) in Pollachi town.
33570011.
Pollachi (H) C&M Division
AS / TS / RAS:
33,57,00 21,56,99 25,00,00 2,00,00 3,00,00
G.O.Ms.No.60, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.
Land aquisition for Construction of Fly over at Goripalayam junction in Madurai town..
164280012.
Madurai (H) C&M Division
AS / TS / RAS:
164,28,00 21,60 49,99,99 10,17,00 50,00,00
G.O.Ms.No.47, Highways and Minor Ports (HS.1) Department, dated:04-03-2016.
1,324,00,49 127,55,20 216,66,59 332,28,98 500,52,235054 04 337 KCTOTAL -
149
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KF Improvement of Road Quality under Comprehensive Road Infrastructure Development Programme (CRIDP)
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KF
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KF 16 06( DPC )
Improvement of road Quality under Comprenshive Road Infrastruture Development Programme.
8500000/10397800/90037291.
Theni (H) C&M Division
AS / TS / RAS:
2,790,16,29 986,86,53 645,74,00 992,72,00 720,55,00
G.O.Ms.No.88/H&MP(HF.2)/dt.19.08.2019 & G.O.Ms.No.71/H&MP(HF.2)/dt.18.05.2020.
2,790,16,29 986,86,53 645,74,00 992,72,00 720,55,005054 04 337 KFTOTAL -
150
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KG Project for the Construction of Chennai Peripheral Ring Road Project (CPRR) with JICA Assistance
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KG 16 04( DPC )
Projects for the construction of Chennai Peripheral Ring Road Project with JICA Assistance
267342001. AS / TS / RAS:
2,673,42,00 18,00,00 500,00,00 315,00,00 600,00,00
G.O Ms No.37, HW&M.P (HW.2) dept dt.08.03.2019.
2,673,42,00 18,00,00 500,00,00 315,00,00 600,00,005054 04 337 KGTOTAL -
151
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KH Widening and improving the road to industries
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KH 16 02( DPC )
Widening from single lane to two lane and improvements to Thodur-Kannanthangal road in Km.6/8-7/2 and Kannanthangal Panchayat Union road.
312171.
Chengalpattu (H) C&M Division
AS / TS / RAS:
3,12,17 1,34,40 1,12,17 1,77,75 2
G.O.Ms.No.73/HW&MP(HS.1), dt.16.07.2019.
Widening from intermediate lane to four lane of pallur-sogandy in Km.16/8-23/8 (MDR-651), Thodur-Kannanthangal road in Km.6/8-7/2 and Kannanthangal Panchayat Union road.
3095952. AS / TS / RAS:
30,95,95 ... 1 1 30,95,94
G.O.Ms.No.73/HW&MP(HS.1), dt.16.07.2019.
Providing land acquisition for Pallur-Sogandy road in Km.16/8-23/8 (MDR-651), Thodur-Kannanthangal road in Km.6/8-7/2 and Kannanthangal Panchayat Union road.
2918473. AS / TS / RAS:
29,18,47 ... 50,00 1 29,18,46
G.O.Ms.No.73/HW&MP(HS.1), dt.16.07.2019.
63,26,59 1,34,40 1,62,18 1,77,77 60,14,425054 04 337 KHTOTAL -
152
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Repairs to Flood damaged Retaining wall at Km 0/8 & 0/10 of Puthupathi to Chinnampathi Road
81501.
Coimbatore (H) C&M Division
AS / TS / RAS:
81,50 24,56 14,06 89,50 1
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of retaining wall at Km.1/2 of Perur Vedapatty road
13522. AS / TS / RAS:
13,52 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Flood damage repairs to the approaches of the minor bridge at Km.2/8 of Thondamuthur Madampatty Road
5423. AS / TS / RAS:
5,42 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall at Km.5/4 of Iruttupallam Poondi road
13624. AS / TS / RAS:
13,62 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at km 34/2 of Pollachi - Valparai road
29215.
Pollachi (H) C&M Division
AS / TS / RAS:
29,21 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall & 2 x 2 m Box Culvert at km 1/10,2/4,2/10,3/4 of Anaimalai loop road (8 Nos.)
106856. AS / TS / RAS:
1,06,85 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of protective wall at km 16/10, 21/4 of Pollachi - Valparai road
20967. AS / TS / RAS:
20,96 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
153
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of 1m x 1 m of Box culvert at km 42/2(i), of Pollachi Valparai road
4738.
Pollachi (H) C&M Division
AS / TS / RAS:
4,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 0/2 of Valparai - Manikakurungumudi road
40089. AS / TS / RAS:
40,08 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 3/6 of Anaimalai loop road
64410. AS / TS / RAS:
6,44 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of pipe Culvert at km 53/4, of Pollalchi Valparai road
33011. AS / TS / RAS:
3,30 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 2/6 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road
208112. AS / TS / RAS:
20,81 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at km 33/4 of Pollachi - Valparai road
220513. AS / TS / RAS:
22,05 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1m Box Culvert at km 28/6, 31/8, 34/6, 35/4, 36/8, 44/6 ,44/10, 45/2, 47/4, of Pollalchi Valparai road
1254214. AS / TS / RAS:
1,25,42 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
154
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of retaining wall at km 30/4 of Pollachi - Valparai road
318415.
Pollachi (H) C&M Division
AS / TS / RAS:
31,84 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1m Box Culvert at km 51/8, 52/2, 53/4, 53/10, 54/8, 55/2,58/2, of Pollalchi Valparai road
975416. AS / TS / RAS:
97,54 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall km 7/6, 8/2Valparai Manikakurungumudi road
374417. AS / TS / RAS:
37,44 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 35/4 of Pollachi Valparai road
47318. AS / TS / RAS:
4,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 12/2 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
76419. AS / TS / RAS:
7,64 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 16/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
72820. AS / TS / RAS:
7,28 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 2/2 of Anaimalai loop road
64421. AS / TS / RAS:
6,44 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
155
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Breast wall in Km 4/8 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road
218722.
Pollachi (H) C&M Division
AS / TS / RAS:
21,87 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 2/6 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road
109923. AS / TS / RAS:
10,99 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 1/10 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road
68724. AS / TS / RAS:
6,87 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 0/2 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road
109925. AS / TS / RAS:
10,99 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 8/4 of Valparai Manikakurungumudi road
154126. AS / TS / RAS:
15,41 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall km 6/8,7/2 of Anaimalai loop road
818427. AS / TS / RAS:
81,84 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Reconstruction of culvert at Km 0/2 of Iyerpady Branch road
13358328. AS / TS / RAS:
13,35,83 15,00,00 16,59,55 16,59,55 13,20,00
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019 / G.O.Ms.No.168/HW&MP(HN.2), dt.23.12.2020.
156
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of 1m x 1 m of Box culvert at km 42/2(ii), of Pollachi Valparai road
47329.
Pollachi (H) C&M Division
AS / TS / RAS:
4,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 12/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
76430. AS / TS / RAS:
7,64 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at Km 0/8,0/10 of Iyerpady Branch road
268431. AS / TS / RAS:
26,84 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km47/8 of Pollachi Valparai road
47332. AS / TS / RAS:
4,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of 1m x 1 m of Box culvert at km 47/4 of Pollachi Valparai road
47333. AS / TS / RAS:
4,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall at Km 0/2 of Iyerpady Branch road
105734. AS / TS / RAS:
10,57 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at Km6/4,6/8,6/10,7/2 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
1410335. AS / TS / RAS:
1,41,03 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
157
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Breast wall in Km 1/8 of Valparai Manikakurungumudi road
151036.
Pollachi (H) C&M Division
AS / TS / RAS:
15,10 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 0/2 of Valparai Manikakurungumudi road
317037. AS / TS / RAS:
31,70 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 3/4 of Animalai loop road
149638. AS / TS / RAS:
14,96 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 1/4 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road
207739. AS / TS / RAS:
20,77 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall & 2 x 2 m Box Culvert at km 0/4, 0/6,0/10,1/4 of Anaimalai loop road (8 Nos.)
1068540. AS / TS / RAS:
1,06,85 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Reconstruction of culvert at Km 0/4 of Iyerpady Branch road
139041. AS / TS / RAS:
13,90 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at Km 11/10,12/2,14/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
1003642. AS / TS / RAS:
1,00,36 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
158
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Retaining wall at Km 0/4 of Iyerpady Branch road
456043.
Pollachi (H) C&M Division
AS / TS / RAS:
45,60 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 47/8 of Pollachi Valparai road
265944. AS / TS / RAS:
26,59 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 29/10(i) of Pollachi Valparai road
141545. AS / TS / RAS:
14,15 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 29/2 of Pollachi Valparai road
183446. AS / TS / RAS:
18,34 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 55/10 of Pollachi Valparai road
141047. AS / TS / RAS:
14,10 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 30/2 of Pollachi Valparai road
263648. AS / TS / RAS:
26,36 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 47/4 of Pollachi Valparai road
165849. AS / TS / RAS:
16,58 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
159
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Retaining wall IN Km 14/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
181250.
Pollachi (H) C&M Division
AS / TS / RAS:
18,12 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at Km 4/2,4/8,5/2,5/6 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
1369351. AS / TS / RAS:
1,36,93 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at km 43/6, 44/2,44/6,44/8 of Pollachi - Valparai road
999852. AS / TS / RAS:
99,98 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of retaining wall at km 33/8 of Pollachi - Valparai road
178553. AS / TS / RAS:
17,85 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast walll at km 48/8,49/10,50/10,51/6,51/10 of Pollachi - Valparai road
1366254. AS / TS / RAS:
1,36,62 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 36/10 of Pollachi Valparai road
62555. AS / TS / RAS:
6,25 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of retaining wall at km 29/10of Pollachi - Valparai road
164056. AS / TS / RAS:
16,40 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
160
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Retaining wall in Km 0/10 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
187357.
Pollachi (H) C&M Division
AS / TS / RAS:
18,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of pipe culvert in Km 1/4,2/6, 3/6,4/4 of Iyerpady to join Km 3/8 of Stanmore Sirukundra road( 4 nos x 5.00)
182358. AS / TS / RAS:
18,23 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 0/6(i) Km 1/8 of castle craft road to join Stanmore Sirikundra road
50759. AS / TS / RAS:
5,07 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 6/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
440460. AS / TS / RAS:
44,04 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 1/6, 1/8 of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road
467261. AS / TS / RAS:
46,72 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 5/2,5/4,5/6,5/8 of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road
912462. AS / TS / RAS:
91,24 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at km 52/2, 52/6,52/8,52/10,53/4 of Pollachi - Valparai road
1366563. AS / TS / RAS:
1,36,65 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
161
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Breast wall at km 53/6,53/8,53/10,54/4 of Pollachi - Valparai road
636064.
Pollachi (H) C&M Division
AS / TS / RAS:
63,60 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall at km 44/10,45/4,45/8,45/10,46/2 of Pollachi - Valparai road
1564965. AS / TS / RAS:
1,56,49 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall at km 52/2 & 54/4 of Pollachi - Valparai road
409066. AS / TS / RAS:
40,90 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall at km 47/2 , 48/6 of Pollachi - Valparai road
678167. AS / TS / RAS:
67,81 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 44/8 of Pollachi Valparai road
362068. AS / TS / RAS:
36,20 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 0/6(i) Km 1/8 of castle craft road to join Stanmore Sirikundra road
77369. AS / TS / RAS:
7,73 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 0/6 of Iyerpady Btanch road
103770. AS / TS / RAS:
10,37 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
162
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of retaining wall at km 29/6 of Pollachi - Valparai road
272071.
Pollachi (H) C&M Division
AS / TS / RAS:
27,20 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of protective wall at km 24/2 of Pollachi - Valparai road
182572. AS / TS / RAS:
18,25 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 2/2 of Animalai loop road
176373. AS / TS / RAS:
17,63 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 1/10 of Animalai loop road
200874. AS / TS / RAS:
20,08 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 45/10 of Pollachi Valparai road
318575. AS / TS / RAS:
31,85 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 43/10 of Pollachi Valparai road
216576. AS / TS / RAS:
21,65 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 42/8 of Pollachi Valparai road
301577. AS / TS / RAS:
30,15 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
163
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Retaining wall in Km 40/8 of Pollachi Valparai road
172878.
Pollachi (H) C&M Division
AS / TS / RAS:
17,28 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 38/4 of Pollachi Valparai road
115779. AS / TS / RAS:
11,57 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 6/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
382280. AS / TS / RAS:
38,22 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 0/4of Iyerpady Btanch road
77781. AS / TS / RAS:
7,77 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 0/2 of Iyerpady Btanch road
77782. AS / TS / RAS:
7,77 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 6/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
161383. AS / TS / RAS:
16,13 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 3/4 Km 1/8 of castle craft road to join Stanmore Sirikundra road
91484. AS / TS / RAS:
9,14 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
164
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Retaining wall in Km 19/10 of Pollachi Valparai road
169885.
Pollachi (H) C&M Division
AS / TS / RAS:
16,98 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 5/8 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
391886. AS / TS / RAS:
39,18 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 5/6 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
381487. AS / TS / RAS:
38,14 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km7/4 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
146288. AS / TS / RAS:
14,62 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km 1/4, 1/6, of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road
522989. AS / TS / RAS:
52,29 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Breast wall in Km 0/2, 2/8 of km 1/8 castle craft road to join of Stanmore - Sirukundra road
409590. AS / TS / RAS:
40,95 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall in Km1/8, 1/10,2/4, 4/4 of km 1/8 of Castle craft road to join Stanmore Sirukundra road
679091. AS / TS / RAS:
67,90 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
165
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Breast wall in Km 5/4of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road
366892.
Pollachi (H) C&M Division
AS / TS / RAS:
36,68 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 16/10, 19/2,19/4 & 19/10 of Udhagai Avalanchi Kundha Thaishola Road including CC Drain
496093.
Ooty (H) C&M Division
AS / TS / RAS:
49,60 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 4/8,4/10,6/6,7/10,8/2,8/4 of Gudalur Sulthan Bathery Road(SH 98).
1005494. AS / TS / RAS:
1,00,54 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 9/10,11/6,12/4,13/6, of Gudalur Sulthan Bathery Road(SH 98).
1691095. AS / TS / RAS:
1,69,10 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 14/6,14/8,14/10,15/2,16/10 of Gudalur Sulthan Bathery Road(SH 98).
1892796. AS / TS / RAS:
1,89,27 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 5/6, 5/8 and 5/10 of Doddabetta Iduhatty Kattabettu Road
847697. AS / TS / RAS:
84,76 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 10/2, 10/10 and 11/4 of Doddabetta Iduhatty Kattabettu Road
1393098. AS / TS / RAS:
1,39,30 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
166
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall at km 1/4,1/10,2/4 &2/6 of Udhagai Avalanchi Kundha Thaishola Road including CC drain
693699.
Ooty (H) C&M Division
AS / TS / RAS:
69,36 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged CC Drain at km 7/4,7/8,8/2 ,8/6,8/10 of Udhagai Avalanchi Kundha Thaishola Road
2955100. AS / TS / RAS:
29,55 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 9/2 & 9/4 of Udhagai Avalanchi Kundha Thaishola Road Including Interlocking Paver Block Pavement and CC drain
4755101. AS / TS / RAS:
47,55 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 20/2,20/4 &20/6 of Udhagai Avalanchi Kundha Thaishola Road including CC drain
4485102. AS / TS / RAS:
44,85 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 4/6, 5/6, 6/4 of Udhagai Kaikatty Road including CC Drain
4953103. AS / TS / RAS:
49,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 26/2, 26/6,28/6 & 29/4 of Udhagai Avalanchi Kundha Thaishola Road Including CC drain
7999104. AS / TS / RAS:
79,99 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 21/4, 21/6,23/6 & 23/8 of Udhagai Avalanchi Kundha Thaishola Road including CC drain
7493105. AS / TS / RAS:
74,93 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
167
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 96/6,96/8,96/10,97/4,97/6 of Calicut Vythiri Gudalur road (SH 12).
12084106.
Ooty (H) C&M Division
AS / TS / RAS:
1,20,84 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/10,3/2,3/6 of Gudalur Sulthan Bathery Road(SH 98).
12470107. AS / TS / RAS:
1,24,70 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Pipe Culverts at km 21/6,21/8 & 21/10 Udhagai Avalanchi Kundha Thaishola Road including CC Drain
1172108. AS / TS / RAS:
11,72 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works and Interlocking paver block at km 107/4 of Calicut Vythiri Gudalur road (SH 12).
10056109. AS / TS / RAS:
1,00,56 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/6,5/2 of Hellan Yellamalai Periasholai Road
4998110. AS / TS / RAS:
49,98 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 7/4,7/6 of Udhagai Kaikatty Road including CC Drain
4459111. AS / TS / RAS:
44,59 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 0/8, 0/10, 1/2, 1/4, 1/8, 1/10 and 4/10 of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road
9635112. AS / TS / RAS:
96,35 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
168
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood damaged Protective wall at Km 5/2, 6/2, 6/6, 8/4, 8/6, 14/10 and 15/10 of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road
9257113.
Ooty (H) C&M Division
AS / TS / RAS:
92,57 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 101/2,101/4,101/6,101/8,101/10,102/4,102/8,102/10of Calicut Vythiri Gudalur road (SH 12).
8231114. AS / TS / RAS:
82,31 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 105/2,105/4 of Calicut Vythiri Gudalur road (SH 12).
5981115. AS / TS / RAS:
59,81 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 103/8,103/10,104/2 of Calicut Vythiri Gudalur road (SH 12).
7796116. AS / TS / RAS:
77,96 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works and Interlocking paver block at km 107/2 of Calicut Vythiri Gudalur road (SH 12).
7070117. AS / TS / RAS:
70,70 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 106/4,106/6,107/4,108/2 of Calicut Nilambur Gudalur road (SH 11).
11571118. AS / TS / RAS:
1,15,71 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 115/6,115/8,115/10 of Calicut Vythiri Gudalur road (SH 12).
8068119. AS / TS / RAS:
80,68 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
169
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 116/6,117/2,117/4,117/6 of Calicut Vythiri Gudalur road (SH 12).
14638120.
Ooty (H) C&M Division
AS / TS / RAS:
1,46,38 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 122/4,122/6,122/8,123/8,124/8 of Calicut Vythiri Gudalur road (SH 12).
9039121. AS / TS / RAS:
90,39 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Flood damage repairs to Protective wall / Cross Drainage works at km 125/4,125/10,126/2,126/4,127/2,127/4,127/10 of Calicut Vythiri Gudalur road (SH 12).
6399122. AS / TS / RAS:
63,99 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 129/4,129/6,129/8,129/10,133/4 of Calicut Vythiri Gudalur road (SH 12).
7743123. AS / TS / RAS:
77,43 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 103/10,104/8,104/10,106/2 of Calicut Nilambur Gudalur road (SH 11).
14145124. AS / TS / RAS:
1,41,45 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 105/6,105/8 of Calicut Vythiri Gudalur road (SH 12).
15069125. AS / TS / RAS:
1,50,69 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 13/8,14/4,14/6,15/8,16/4 of Nellakottai Devala Road
9428126. AS / TS / RAS:
94,28 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
170
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Protective wall at Km 0/4, 0/6 of Kaikatty Kolacombai road.
7125127.
Ooty (H) C&M Division
AS / TS / RAS:
71,25 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 1/4 & 2/4 of New Avalanchi Duck Bungalow Road
4458128. AS / TS / RAS:
44,58 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 0/10 & 1/2 of New Avalanchi Duck Bungalow Road including CC Drain
4436129. AS / TS / RAS:
44,36 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 0/6 & 0/8 of New Avalanchi Duck Bungalow Road
4444130. AS / TS / RAS:
44,44 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 2/2,2/4 of Ithalar Bembatty Road including CC Drain
8069131. AS / TS / RAS:
80,69 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/8,4/10,5/8,8/6,10/4 of Gudalur O valley Road
9042132. AS / TS / RAS:
90,42 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2,0/4,0/6 of Sand Hills Road
7504133. AS / TS / RAS:
75,04 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
171
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Culvert at km 6/10 of New Avalanchi Duck Bungalow Road including Protective works
4889134.
Ooty (H) C&M Division
AS / TS / RAS:
48,89 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/10,1/2,1/4- of Road from KM 25/4 of Gudalur Sulthan Bathery to Palamvayal Road
306247135. AS / TS / RAS:
30,62,47 25,73,12 38,19,33 53,60,21 28,72,00
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019 / G.O.Ms.No.168/HW&MP(HN.2), dt.23.12.2020.
Permanent Restoration to Flood Damaged Culvert at km 7/4 of New Avalanchi Duck Bungalow Road including Protective works
4889136. AS / TS / RAS:
48,89 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/10,4/2,4/8,5/6,6/6 of Devala Atikunna Uppatti Road
16049137. AS / TS / RAS:
1,60,49 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged High level Bridge at km 9/10 of Hellan Yellamalai Periasholai Road
9068138. AS / TS / RAS:
90,68 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 7/2,7/6,7/8 ,7/10 of Hellan Yellamalai Periasholai Road
6553139. AS / TS / RAS:
65,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/6,1/2,1/4,1/6 of Pandalur Uppatti via Koomola Road
7030140. AS / TS / RAS:
70,30 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
172
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/4,0/6 of Calicut Vythiri Gudalur Road to Ayyankolly via Kolappali Road
9000141.
Ooty (H) C&M Division
AS / TS / RAS:
90,00 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 13/2 & 13/4 of Udhagai Kaikatty Road including CC Drain
4775142. AS / TS / RAS:
47,75 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Protective wall at Km 0/6 ,1/6 & 1/8 of Selas Kolacombai road.
7408143. AS / TS / RAS:
74,08 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2,0/4 of May Field Road
9038144. AS / TS / RAS:
90,38 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 4/2 of Palada Lovedale Road including CC Drain and Paver Block Pavement
9050145. AS / TS / RAS:
90,50 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 0/6 & 0/8 of Porthiyada Bykada Road including CC Drain
3152146. AS / TS / RAS:
31,52 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 0/8 of Attuboil Road including CC Drain
2067147. AS / TS / RAS:
20,67 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
173
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall at km 1/4 of Belithala Road including CC Drain
4340148.
Ooty (H) C&M Division
AS / TS / RAS:
43,40 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Pipe Culvert, Protective wall, CC Drain including InterLocking Paver Block Pavement at km 0/2 of Belithala Road
4448149. AS / TS / RAS:
44,48 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 0/10,1/2, 2/8 of M. Palada B.Manihatty(via) Kallakorai Hada Gandhinagar Road including CC Drain
5959150. AS / TS / RAS:
59,59 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Pipe Culverts at km 5/8,6/4,6/6 & 6/8 of Palada Lovedale Road including CC Drain
1468151. AS / TS / RAS:
14,68 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km1/6 & 2/4 of Palada Lovedale Road including CC Drain
3536152. AS / TS / RAS:
35,36 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Culvert at km 3/2 of New Avalanchi Duck Bungalow Road including Protective works
4889153. AS / TS / RAS:
48,89 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 0/2, 0/4,4/4, of Palada Lovedale Road including CC Drain
4664154. AS / TS / RAS:
46,64 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
174
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Protective wall at Km 0/4, 0/10 of Lovedale Ketty (via) Achanakkal road.
7480155.
Ooty (H) C&M Division
AS / TS / RAS:
74,80 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 4/6,4/8 , 5/6, & 6/2 of Thangadu Edakadu Road including CC Drain
8168156. AS / TS / RAS:
81,68 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 3/8 of Thangadu Edakadu Road including CC Drain
6689157. AS / TS / RAS:
66,89 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 5/6 of MelKundha Bikkatty Emerald Road including CC Drain
5599158. AS / TS / RAS:
55,99 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 3/6,4/4 of MelKundha Bikkatty Emerald Road including CC Drain
7482159. AS / TS / RAS:
74,82 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Slab Culvert at km 4/6 of MelKundha Bikkatty Emerald Road
4759160. AS / TS / RAS:
47,59 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at Km 3/6 , 4/4 and Pipe Culvert at km 4/2 of Theetukal Kuruthukuli Nanjanad Road
3931161. AS / TS / RAS:
39,31 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
175
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall at km 2/8 & 6/6 of New Avalanchi Duck Bungalow Road
2950162.
Ooty (H) C&M Division
AS / TS / RAS:
29,50 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 1/10 of Ithalar Bembatty Road including CC Drain
7970163. AS / TS / RAS:
79,70 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Protective wall at Km 3/8 of Wellington kotagiri road.
1482164. AS / TS / RAS:
14,82 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2,0/6,1/2,1/8,4/6 of Nellakottai Devala Road
13605165. AS / TS / RAS:
1,36,05 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 1/6 - 1/8 of Udhagai Sholur Road
10933166. AS / TS / RAS:
1,09,33 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Pipe culvert, CC Drain and Protective wall at Km 5/2, 5/4, 5/6 and 5/8 of T.R. Bazaar Terrace estate Road
11429167. AS / TS / RAS:
1,14,29 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Slab culvert, Pipe culvert and Protective wall at Km 5/10 of T.R. Bazaar Terrace estate Road
11937168. AS / TS / RAS:
1,19,37 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
176
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 18/2,18/6,18/8,19/4,19/6,19/10,20/2 of Sulthan Bathery Cherambadi Road(MDR).
16101169.
Ooty (H) C&M Division
AS / TS / RAS:
1,61,01 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 16/2,16/8,17/6,17/8 of Sulthan Bathery Cherambadi Road(MDR).
13644170. AS / TS / RAS:
1,36,44 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 14/6,14/10,15/2,15/8 of Sulthan Bathery Cherambadi Road(MDR).
12053171. AS / TS / RAS:
1,20,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Protective wall at Km 2/8 of Selas Kolacombai road.
6055172. AS / TS / RAS:
60,55 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 6/2, 6/4, 6/6 and 6/8 of Cannimara Road
11901173. AS / TS / RAS:
1,19,01 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Protective wall at Km 5/2 & 5/6 of Wellington kotagiri road.
5003174. AS / TS / RAS:
50,03 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 6/8, 6/10, 7/2 and 8/4 of Cannimara Road
9956175. AS / TS / RAS:
99,56 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
177
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Construction of Protective wall at Km 6/2 of Ketty Palada Selas road.
7465176.
Ooty (H) C&M Division
AS / TS / RAS:
74,65 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 29/4,29/6 of Coonoor Kundha Road Including CC Drain
3974177. AS / TS / RAS:
39,74 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 28/4 & 28/6 of Coonoor Kundha Road Including CC Drain
4153178. AS / TS / RAS:
41,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 24/10 & 26/2 of Coonoor Kundha Road including CC Drain
3948179. AS / TS / RAS:
39,48 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 20/4 & 20/6 of Coonoor Kundha Road
3384180. AS / TS / RAS:
33,84 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 19/6 & 19/8 of Coonoor Kundha Road including CC Drain
1937181. AS / TS / RAS:
19,37 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 18/10 & 19/2 of Coonoor Kundha Road
4765182. AS / TS / RAS:
47,65 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
178
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall at km 14/10 &15/2 of Udhagai Kaikatty Road
4782183.
Ooty (H) C&M Division
AS / TS / RAS:
47,82 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged CC Drain and Culverts at km 9/6,9/8 & 10/2 of Udhagai Kaikatty Road
2532184. AS / TS / RAS:
25,32 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Retaining wall at Km 7/10 of Wellington kotagiri road.
2966185. AS / TS / RAS:
29,66 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 2/2, 2/8 and 2/10 of Thummantty T.Manihatty Road
9748186. AS / TS / RAS:
97,48 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 2/2,2/6 of Melkowatty Road.
1955187. AS / TS / RAS:
19,55 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 2/8 of Ithalar Bembatty Road including CC Drain
3368188. AS / TS / RAS:
33,68 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Pipe culvert and Protective wall at Km 7/8,7/10 of Udhagai Sholur Road
5949189. AS / TS / RAS:
59,49 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
179
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood Damaged Protective wall at km 0/10 of Kundah Kotagiri Road
2053190.
Ooty (H) C&M Division
AS / TS / RAS:
20,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Protective wall at Km 8/6 of Dolphin's Nose road.
7540191. AS / TS / RAS:
75,40 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 2/2 & 2/8 of B.Manihatty Road including CC Drain
3153192. AS / TS / RAS:
31,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 2/6 of Windcap Road
6949193. AS / TS / RAS:
69,49 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood Damaged Protective wall at km 5/6 of Thaishola KoraKundha Upper Bhavani Road
2459194. AS / TS / RAS:
24,59 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 0/2, 0/4 and 0/8 of Thummantty T.Manihatty Road
9226195. AS / TS / RAS:
92,26 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 1/4, 3/6 and 3/10 of Buttercombai Kappachi Road
9480196. AS / TS / RAS:
94,80 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
180
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KI Permanent Flood Restoration of Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 KI 16 00( DPC )
Permanent Restoration to Flood damaged Protective wall at Km 7/8, 7/10, 8/2 and 9/8 of Kagguchi Kookal Kookalthorai Road
8447197.
Ooty (H) C&M Division
AS / TS / RAS:
84,47 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 4/10, 5/2 and 5/6 of Kagguchi Kookal Kookalthorai Road
8953198. AS / TS / RAS:
89,53 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Construction of Protective wall at Km 8/4 of Dolphin's Nose road.
7041199. AS / TS / RAS:
70,41 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
Permanent Restoration to Flood damaged Protective wall at Km 6/4, 6/8, 6/10, 7/4 and 7/6 of Dhavani Road
9440200. AS / TS / RAS:
94,40 ... ... ... ...
G.O.Ms.No.140/HW&MP(HN.1), dt.21.11.2019.
154,98,94 40,97,68 54,92,94 71,09,26 41,92,015054 04 337 KITOTAL -
181
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
PB Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase -
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 PB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 337 PB 16 09( DPC )
Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase-2.
4500001.
Thiuvallur(H) C&M Division
AS / TS / RAS:
45,00,00 13,72,97 31,27,03 15,00,00 16,27,03
G.O.Ms.No.67, HW&MP dept, dt.05.09.2017.
45,00,00 13,72,97 31,27,03 15,00,00 16,27,035054 04 337 PBTOTAL -
182
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
PC Acquisition of lands for formation of Chennai Peripheral Ring Road (CPRR) with JICA Assistance
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 PC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 04 337 PC 64 06( DPC )
Extenally Aided Project PC-Acquisition of lands for Formation of Chennai Peripheral Ring Road with JICA Assistance
260332001. AS / TS / RAS:
2,603,32,00 79,41 500,00,00 650,00,00 952,52,59
G.O.Ms.No.74/HW & MP (HW.2)/ dt.09.05.2018.
2,603,32,00 79,41 500,00,00 650,00,00 952,52,595054 04 337 PCTOTAL -
183
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
789 Special Component Plan for Scheduled Castes
JC Comprehensive Road Infrastructure Development Programme (CRIDP) - Other District Roads under Special Component Plan
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 789 JC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 789 JC 16 06( DPC )
CRIDP
2318600/2283100/2474100/17477591. AS / TS / RAS:
882,35,59 198,30,16 217,42,00 217,42,00 154,20,00
G.O Ms No.125, HW&M.P (HF.2) dept dt.07.08.2018, G.O Ms No.88, HW&M.P (HF.2) dept dt.19.08.2019, G.O Ms No.71, HW&M.P (HF.2) dept dt.18.05.2020.
882,35,59 198,30,16 217,42,00 217,42,00 154,20,005054 04 789 JCTOTAL -
184
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
800 Other Expenditure
JJ Rehabilitation of Distressed Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 04 800 JJ 16 06( DPC )
Rehabilitation of High Level Bridge across Thenpennaiyar River at Km.0/2 of Pennaiyar Bridge approach road (SHU-47)
230191.
Kallakurichi (H) C&M Division
AS / TS / RAS:
2,30,19 ... 1,20,19 2,30,19 1
G.O.Ms.No.115/HW&MP(HP.1), dt.17.10.2019.
2,30,19 ... 1,20,19 2,30,19 15054 04 800 JJTOTAL -
185
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
800 Other Expenditure
JK Acquisition of Lands for Bye Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JK
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 04 800 JK 64 03( DPC )
L.A Compensation - EMRIP
1379751.
Thiuvallur(H) C&M Division
AS / TS / RAS:
13,79,75 ... ... 13,79,75 ...
GO Ms No.123, Highways(HW.2)dept/dt.03.10.2020.
Acquisition of land for the work widening to six lane in Km.59/6 - 81/6 of Chennai - Tiruthani - Renigunda road.
16800002. AS / TS / RAS:
168,00,00 29,67 10,00,00 5,00,00 162,70,33
GO Ms No.151, Highways(HW.2)dept/dt.04.10.2013.
Forming bypass road to Walajabad Town at Km.49/2 of SCKAT.
6633003.
Chengalpattu (H) C&M Division
AS / TS / RAS:
66,33,00 ... ... 1 1
G.O.Ms.No.49/H&M.P (HV.2) / dt.23.04.2015.
Forming of ring road to Uthiramerur.
7700004. AS / TS / RAS:
77,00,00 ... 1,00,00 1,00,00 6,00,00
GO Ms No.158, Highways(HW.2)dept/dt.10.10.2013.
L.A. Compensation
1685.
Kallakurichi (H) C&M Division
AS / TS / RAS:
1,68 ... ... ... ...
G.O.(D).No.78/H&M.P (HP.1) / dt.29.05.2019.
Acquisition of Lands for formation of bypass to Mannachanallur town starting from km 2/2 of Trichy-Thuraiyur road (SH-62) and ends at km 4/6 of the same road
1440006.
Trichy (H) C&M Division
AS / TS / RAS:
14,40,00 5,00,00 1 9,40,00 1
GO.Ms.No.209/H w& M.P department /dated.17-12-2012
Acquisition of land for forming link road to Pudukottai town.
136000/1368287.
Pudukottai (H) C&M Division
AS / TS / RAS:
13,68,28 3,60,00 1 15,00 1
GO Ms No.90, Highways(HP.1)dept/dt.11.06.2013 / GO Ms No.153, Highways(HP.1)dept/dt.02.12.2019.
186
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
800 Other Expenditure
JK Acquisition of Lands for Bye Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JK
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 04 800 JK 64 03( DPC )
Acquisition of Lands for forming bye-pass road toThirukkattupalli Town
418008.
Thanjavur (H) C&M Division
AS / TS / RAS:
4,18,00 ... ... 4,18,00 1
GO.Ms.No.80/H & M.P/(HP.2) department /dated.15.05.08
Acquisition of Lands for forming ring road to Mannargudi town branching and merging at km 35/2 of Kumbakonam-Mannargudi-Adhiramapattinam road (SH-66)
1006009.
Thiruvarur (H) C&M Division
AS / TS / RAS:
10,06,00 9,67,68 2 25,00 1
GO.Ms.No.208/H w& M.P department /dated.17-12-2012
Acqusition of Lands for forming bye-pass road in Tiruvarur Town. G.O.Ms.No.307/Highways (HP.2)dept/dt.06.12.2010.
101000/47000010. AS / TS / RAS:
47,00,00 10,00,00 20,05,00 37,00,00 ...
RAS-GO.Ms.No.43/H w& M.P (HP.2)department /dated.14-06-2017.
Forming of Byepass Road to Rasipuram-Namakkal Dt.
41007 / 71179/92811/16570011.
Namakkal (H) C&M Division
AS / TS / RAS:
36,57,00 36,57,00 1 1 1
GO Ms No.90, Highways(H&MP)dept/dt.20.05.09 & RAS G.O.No.8/H&M.P (HQ.2)/dt.21.01.2014 & G.O.Ms.No.80/H&m.P (HP.2)/25.05.2016 & G.O.Ms.No.25/H&MP9HP.2)/dt.27.02.2018.
L.A. Compensation
119812.
Krishnagiri (H) C&M Division
AS / TS / RAS:
11,98 ... ... ... ...
G.O.No.62/H&M.P (HQ.2) / dt.02.07.2019.
Forming of ring road to Karur.
77000013.
Karur (H) C&M Division
AS / TS / RAS:
77,00,00 ... 19,95,00 50,00 29,45,00
GO Ms No.164, Highways(HP.2)dept/dt.18.10.2013.
Acqusition of Land and shifting of utilities for the construction of flyover along Athupalam and Ukkadam junction in Coimbatore.
88610014.
Coimbatore (H) C&M Division
AS / TS / RAS:
88,61,00 51,13,01 30,00,00 30,00,00 7,47,94
G.O.Ms.No.103/H&M>P (HS.2) / dt.26.08.2015.
187
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
800 Other Expenditure
JK Acquisition of Lands for Bye Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JK
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
64 Lands 5054 04 800 JK 64 03( DPC )
Acqusition of Lands for Construction of flyover in Madurai City Periyar bus stand to Sethupathi High school.
38000015.
Madurai (H) C&M Division
AS / TS / RAS:
38,00,00 14,08 14,33,21 37,85,91 1
G.O.Ms.No.48/23.04.2015.
Acquisition of land for formation of bypass to Dindigul Town at Km.0/0 - 19/250.
54710016.
Dindigul (H) C&M Division
AS / TS / RAS:
54,71,00 ... 5,00,00 2,00,00 52,71,00
G.O.Ms.No.209/H&M.P (HS.2) / dt.12.12.2018.
Acquisition of land for forming bypass in Parthibanur
1028017.
Ramnad (H) C&M Division
AS / TS / RAS:
1,02,80 36,01 66,79 66,79 1
RAS.G.O.Ms.No.127/HQ.1/dated.07.11.2019.
Acqusition of Land and shifting work for construction of flyover at VVD junction in Thoothukudi Dt.
49000/RAS9750018.
Tuticorin (H) C&M Division
AS / TS / RAS:
9,75,00 5,64,41 4,00,00 1,00 4,00,00
RAS.G.O Ms No.59, Highways(HP.2)dept/dt.25.04.2018.
Acquisition of land for formation of outer ring road to Sivakasi Town.
82450019.
Virudhunagar (H) C&M Division
AS / TS / RAS:
82,45,00 39,05,00 20,00,00 10,00,00 33,00,00
GO Ms No.145, Highways(HS.1)dept/dt.24.01.2013. Ras-GO Ms No.143, Highways(HP.2)dept/dt.14.06.2017.
802,70,49 161,46,86 125,00,05 151,81,47 295,34,355054 04 800 JKTOTAL -
188
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
004 Research and Development
AA Investigation/ Estimation of project work under Roads and Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 004 AA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 80 004 AA 16 09( DPC )
Investigation/Estimation of project work under Roads and Bridges-LS provision ( Revolving Fund )
7434481.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
74,34,48 17,87,39 18,92,40 29,70,44 19,21,15
74,34,48 17,87,39 18,92,40 29,70,44 19,21,155054 80 004 AATOTAL -
189
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JX Upgradation of IT Highways in Chennai City
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JX
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 80 800 JX 16 06( DPC )
Upgradation of IT Highways in Chennai - Rajiv Gandhi Phase II. G.O.Ms.No.79/H&M.P (H.W.2) dept/27.03.2007.
10813001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
108,13,00 10,00,00 ... 10,00,00 40,00,00
G.O.Ms.No.151/H &M.P (HW.2) dept, dt.29.11.2019
64 Lands 5054 80 800 JX 64 05( DPC )
Upgradation of IT Highways in Chennai - Rajiv Gandhi Phase II. G.O.Ms.No.79/H&M.P (H.W.2) dept/27.03.2007.
2946800/46513001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
465,13,00 ... ... ... ...
G.O.Ms.No.130/H&M.P (H.Q.2) dept/20.07.2012. & RAS.G.O.Ms.No.43/H&M.P (H.P.2) dept/14.06.2017.
573,26,00 10,00,00 ... 10,00,00 40,00,005054 80 800 JXTOTAL -
190
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
KI Chennai Outer Ring Road - Phase II
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 80 800 KI 16 05( DPC )
Chennai Outer Ring Road Phase-II formation of road connecting NH 205, NH-5 and Tiruvottiyur-Ponneri-Panchetty road from Nemilichery to Minjur under Public Private Partnership - Annuity basis with Project Support Fund - Tamil Nadu Road Development Company
107500001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
1,075,00,00 236,70,00 274,49,00 229,13,14 192,27,06
G.O.Ms.No.10, HW&MP Department, dated:23-01-2012
64 Lands 5054 80 800 KI 64 04( DPC )
Chennai Outer Ring Road Phase-II formation of road connecting NH 205, NH-5 and Tiruvottiyur-Ponneri-Panchetty road from Nemilichery to Minjur under Public Private Partnership - Annuity basis with Project Support Fund - Tamil Nadu Road Development Company
107500001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
1,075,00,00 175,00,00 52,62,00 52,62,00 1
G.O.Ms.No.10, HW&MP Department, dated:23-01-2012
2,150,00,00 411,70,00 327,11,00 281,75,14 192,27,075054 80 800 KITOTAL -
191
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
KN Development of Northern Port Access Road Project
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KN
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 80 800 KN 16 05( DPC )
Management Associate fee to the TNRDC Ltd for Northening Port Access Road Project
240001.
Thiuvallur(H) C&M Division
AS / TS / RAS:
2,40,00 25,00 1 ... ...
G.O.Ms.No.126, HW&MP(HF.2) Department, dated:28-12-2016.
64 Lands 5054 80 800 KN 64 04( DPC )
Acquisition of private lands and transfer of Government Lands comparised in 15 villages of Ponneri Taluk in Thiruvallur District.
95100001.
Thiuvallur(H) C&M Division
AS / TS / RAS:
951,00,00 ... 200,00,00 400,00,00 100,00,00
G.O.Ms.No.33, HW&MP Department, dated:19-02-2016.
953,40,00 25,00 200,00,01 400,00,00 100,00,005054 80 800 KNTOTAL -
192
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
KO Special Project for attending Road Safety
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KO
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 3 Chief Engineer (Construction & Maintenance), Highways
16 Major Works 5054 80 800 KO 16 03( DPC )
Special Project for Attending to Road Safety
23400001.
Chennai City Roads (H) C&M Division
AS / TS / RAS:
234,00,00 75,76,95 100,00,00 54,23,08 100,00,00
234,00,00 75,76,95 100,00,00 54,23,08 100,00,005054 80 800 KOTOTAL -
193
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JB Construction of Bridges with Loan Assistance from HUDCO
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 03 101 JB 64 04( DPC )
Erode District Bhavani Taluk Land acquired to an extent of 19293 sq.ft from Bhavani Municipality to form approach road to the Bridges on Cauvery river between Bhavani and Kumarapalayam by the Highways Department compensation LA
97081.
Salem Division (Projects)
AS / TS / RAS:
97,08 97,08 1 1 1
G.O.(Ms) No. 90 Highways and Minor Ports (HS1)dated 04.08.2015
97,08 97,08 1 1 15054 03 101 JBTOTAL -
194
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JD Construction of Road over Bridges in Chennai Metro Area for Traffic Management
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 03 101 JD 16 01( DPC )
Construction of ROB at GNT road in Vyasarpadi. CE PROJECTS R.A.S. G.O.Ms.No. 222, Highways and Minor Ports Department datted: 22.9.2008.
8068001.
Chennai Division-I(Projects)
AS / TS / RAS:
80,68,00 79,12,86 1,55,14 1,55,13 1
G.O.Ms.No.229, Highways (HN 1) Department dated: 14.11.2005.
Construction of Three Lane Bridge adjacent to the Thiru-Vi-Ka bridge at Chennai. CE METRO
90000/130096/1512102.
C.E. Metro
AS / TS / RAS:
15,12,10 13,90,69 ... ... ...
G.O.Ms.No. 248, HiGhways (HN1) Department dt. 30.7.2010
Construction of Grade Separator in the intersection of NSK Road (Arcot Road) and Inner Ring Roat at Vadapalani. CE METRO
8070653. AS / TS / RAS:
80,70,65 75,17,51 ... 1 1
G.O.Ms.No. 103, Highways and Minor Ports Department dated: 12.6.2012 / G.O.MS.NO.26/HW&MP (HP2)Dept./Dt.11.04.17
Construction of Grade Separator at Moolakkadai Junction at Km 8/6 of GNT road. CE METRO
4955004. AS / TS / RAS:
49,55,00 47,11,37 ... ... ...
G.O.Ms.No. 248, Hihways (HN1) Department dt. 30.7.2010
Construction of Grade Separator at the Intersection of Anna Nagar second avenue and Mogappair road with IRR at Thirumangalam. CE METRO
6023005. AS / TS / RAS:
60,23,00 58,01,97 ... ... ...
G.O.(D) No. 235, Highways and Minor Ports(HW1) Department dt. 9.12.2010
Providing a high level bridge across Ennore creek to connecting Ennore Express way road with North Chennai Thermal power plant. CE METRO
5266006. AS / TS / RAS:
52,66,00 51,48,63 1 1 ...
G.O.(D) No. 235, Highways and Minor Ports (HW1)Department dt. 9.12.2010
River Bridge across Coovum river at road connecting GNT road at Km 11/2 and Mugappair. CE METRO
1661007. AS / TS / RAS:
16,61,00 16,45,96 ... ... ...
G.O.(D) No. 127, Highways and Minor Ports Department dt. 7.7.2009
195
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JD Construction of Road over Bridges in Chennai Metro Area for Traffic Management
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 03 101 JD 16 01( DPC )
Providing a Grade Separator at Kodambakkam- Sriperumpudur road intersecting with Mount Poonamallee road at Porur. CE METRO
540000/540000/5805008.
C.E. Metro
AS / TS / RAS:
58,05,00 54,24,74 1 45,00 1
G.O.Ms.No. 127, Highways and Minor Ports Department dated: 7.7.2009. RAS G.O.MS.No.75/HW&MP Dept./Dt.23.09.17
413,60,75 395,53,73 1,55,16 2,00,15 35054 03 101 JDTOTAL -
196
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JG Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 03 101 JG 16 05( DPC )
Construction of ROB in lieu of Existing LC No. 25 at Railway KM 57/9-58/0 in between Manabur and Thiruvalangadu Railway station.
42300/380371.
Chennai Division-I(Projects)
AS / TS / RAS:
3,80,37 ... ... 10,00 3,62,76
GO.(MS) No. 11/H & M (HQ2) Dept dt. 31.01.2019.
Construction of ROB at KM 7/6 of Keelvithi-Ameerpet road in lieu of existing LC No 37 at Railway Km 80/6-8 near Anvarthiganpet Railway Station
160400/1604002.
Vellore Division(Projects)
AS / TS / RAS:
16,04,00 4,54 5,00,00 1,05 1,00,00
G.O.(MS)No.125/ Highways and Minor Ports (HQ2) Department Dated:28.12.2016
Construction of ROB in lieu of existing L.C.No.123 at Railway km.147/100-200 in between Vellore contonment and Kaniyampadi Railway stations at km.4/0 of Vellore..
219600/2296003. AS / TS / RAS:
22,96,00 17,30,44 20,00 1 3,00,00
G.O. Ms. No. 54, Highways (HQ-2) Department, dt. 04.03.2016
Improvements to Jawans Bhavan road 0/0 to Km 1/8 as a diversion road for the construction of ROB at LC 157 in Kammiyampettai
196504.
Cuddalore Division(Projects)
AS / TS / RAS:
1,96,50 ... 1,86,50 1,00,00 96,50
G.O. Ms. No. 128, Highways (HP-1) Department, dt. 23.08.2018
Construction of ROB in lieu of existing L.C.No.34 at km.2/4 of Tiruvarur-Mannargudi-Muthupettai road (SH 202).
2760005.
Thanjavur Division (Projects)
AS / TS / RAS:
27,60,00 ... 4,05,00 1 10,10,00
G.O. Ms. No. 56, Highways (HP-2) Department, dt. 04.03.2016
Construction of Road Over Bridge in lieu of Level Crossing No. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road (SH 23) in between Railway Km 15/100-15/200 at Peralam Railway Station Yard of Mayiladuthurai-Tthiruvarur Section
4382666. AS / TS / RAS:
43,82,66 ... ... ... 3,00,00
G.O.(MS) No. 89, Highways and Minor Ports (HQ2) Departmentt dated: 23.07.2020
Construction of ROB km 1/8 of Pollachi– Palakkad Road in lieu of existing LC.No. 122 at Railway Km 123/1-2 in between Pollachi and Kinathukadavu
484824/4573377.
Coimbatore Division (Projects)
AS / TS / RAS:
45,73,37 10,48,30 29,31,18 23,74,24 11,50,83
G.O. Ms. No. 168 /H&MP (HQ2) dept dt. 12.10.2018
197
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JG Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 03 101 JG 16 05( DPC )
Construction of ROB and LUS at km 1/6 of Thudiyalur – Kovilpalayam road and Railway Km 8/000-100 in lieu of existing LC.No.5 in between Coimbatore North and Karamadai Railway stations(16 major works)
2610708.
Coimbatore Division (Projects)
AS / TS / RAS:
26,10,70 13,88 20,86,82 2,22,32 23,74,50
G.O. Ms. No. 180 /H&M (HQ2) dept dt. 30.1.2018
Construction of ROB at Railway km. 26/500-600 in lieu of existing LC. No. 11 and Construction of Limited Use Subway at Railway km.26/100-200 in between Karamadai and Mettupalayam Stations
3423009. AS / TS / RAS:
... ... ... 76,40 10,05,00
G.O. (Ms) No. 91/H&M Ports ( HQ2) Dept. dt. 28.07.2020
Construction of Limited Use Subway at km 14/2 of Kumarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH-198) near SPB Mills at Pallipalayam near Cauvery Railway station.
201500/221500/26565510.
Salem Division (Projects)
AS / TS / RAS:
26,56,55 20,89,72 1 5,66,83 1
G.O.Ms.No.107/Highways & Minor Ports (HP2) department Dated.28.08.2020.
Construction of ROB at Km.7/2 of Tholasampatty road in lieu of existing LC 15 at Railway Km.15/13-14 in between Tholasampatty and Mecheri Railway Stations.(16 Major Works)
184435/20280011. AS / TS / RAS:
20,28,00 1,07,44 12,91,35 5,06,88 14,04,68
G.O. (Ms)No.164/ Highways & Minor Ports(HQ2) Dept., Dt. 28.09.2018
Construction of ROB at Km.12/8 of Suramangalam-Omalur road (via) Muthunaicken patty (MDR 696) in lieu of existing LC 7 at Railway Km.6/4-5 in between Magnesite and Omalur Railway Stations.(16 Major Works)
13423712. AS / TS / RAS:
14,97,90 6,29 10,50,47 9,33,82 4,69,72
G.O. (Ms)No.169/ Highways & Minor Ports(HP1) Dept., Dt. 16.10.2018
Construction of ROB at Km.40/8 of Sankari-Mecheri raod(via) Edappadi road(SH223) at Railway Km.23/17-18 in lieu of exisitng LC No.18 at Railway Km.24/10-11 at Mecheri Road yard. (16 Major Works)
193355/21260013. AS / TS / RAS:
21,26,00 98,61 15,94,62 5,63,27 14,64,12
G.O. (Ms)No.178/ Highways & Minor Ports(HQ2) Dept., Dt. 29.10.2018
Construction of ROB at km.144/2 in lieu of existing L.C.No.38 at Railway km.60/100-200 in between Shivadi and Dharmapuri Railway stations.
120700/13250014. AS / TS / RAS:
13,25,00 10,60,94 1,01,46 1,71,52 1,00
G.O. Ms. No. 51, Highways (HQ-2) Department, dt. 04.03.2016
198
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JG Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 03 101 JG 16 05( DPC )
Construction of ROB at km.0/8 of Sholavandhan-Valayapatti road (via Andipatty) in lieu of existing L.C.No.346 at Railway km.473/600-700 in between Madurai and Dindigul Railway stations.
181800/19760015.
Madurai Divison (Projects)
AS / TS / RAS:
19,76,00 12,48,48 1,50,93 7,27,52 1
G.O. Ms. No. 50, Highways (HQ-2) Department, dt. 04.03.2016
Construction of Road Over Bridge at Km 0/8 of Rajapalayam-Vembakottai Road (SHU-186) in lieu of existing Level Crossing No 449 at railway Km 591/900-592/0 near Rajapalayam railway Station - 16 Major Works
232483/26285016.
Tirunelveli Division (Projects)
AS / TS / RAS:
26,28,50 5,60,33 19,50,00 2,51,20 13,77,07
G.O. Ms. No. 117 Highways and Minor Ports(HQ2) Department Dated 12.07.2018 (FS)
64 Lands 5054 03 101 JG 64 04( DPC )
Construction road over bridge at Km 5/4 of Jaffarapet Road in lieu of existing LC No.55 at Railway km 134/2-3 in between Katpadi-Latteri Railway stations.
277601.
Vellore Division(Projects)
AS / TS / RAS:
... ... ... ... 2,72,60
G.O.(Ms)No.144, Highways and Minor Ports(HQ2) Department, Dated:13.11.2020
Construction of Road Over Bridge at Km 7/2 of Damalerimuthur Roaod in lieu of existing Level Crossing No.92 at Railway Km 220/500-600 in between Somanayakkanpatti and Pachur Railway Stations
176532. AS / TS / RAS:
1,76,53 ... ... 1,60,00 16,53
G.O.(Ms)No.78, Highways and Minor Ports(HQ2) Department, Dated:17.06.2020
Construction of ROB at Km 3/0 ofGoodanagaram-Anakanallur Road in lieu of existing LC No 67 at Railway km 160/2-4 in between Melalathur and Valathur Railway Stations (Land Acquisition) (64 Lands)
178003. AS / TS / RAS:
1,78,00 ... 1,00,00 1,50,00 28,00
G.O. Ms. No. 4 Highways and Minor Ports(HQ2) Department Dated 02.01.2019
Construction of Road Over Bridge at Km 2/2 of Patchur - Kothur Road inlieu of existing Level Crossing No.95 at Railway Km 228/500-600 in between Pachur and Malanur Railway Stations
183004. AS / TS / RAS:
1,83,00 ... ... 5,01 1,77,99
G.O.(Ms)No.78, Highways and Minor Ports(HQ2) Department, Dated:17.06.2020
199
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JG Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 03 101 JG 64 04( DPC )
Construction of Road Over Bridge at Km 1/2 of Kudiyanakuppam Road in lieu of existing Level crossing No.91 at Railway Km 218/500-600 in between Jolarpet and Somanayakkanpatti Railway Stations
32005.
Vellore Division(Projects)
AS / TS / RAS:
32,00 ... ... 30,00 2,00
G.O.(Ms)No.78, Highways and Minor Ports(HQ2) Department, Dated:17.06.2020
Construction road over bridge at Railway km 123/2-3 LC no. 51in between Sevur Thirumalam Railway Station at km 0/4 of Sevur-Sanitorium-Kandipedu Road.
284206. AS / TS / RAS:
... ... ... ... 2,79,20
G.O.(Ms)No.144, Highways and Minor Ports(HQ2) Department, Dated:13.11.2020
Construction of ROB at Km 0/2 of Lakshmi Ammalpuram to Navithampatti Road in lieu of existing LC No 72 at Railway km 168/12-14 in between Melpatti and Valathur Railway Stations (Land Acquisition) (64 Lands)
174007. AS / TS / RAS:
1,74,00 ... 1,00,00 1,54,00 20,00
G.O. Ms. No. 3 Highways and Minor Ports(HQ2) Department Dated 02.01.2019
Construction of Road Under Bridge at Railway Km 64/4-6 in lieu of existing Level Crossing No.28 in between Arakkonam and Mosur Railway Stations
241008. AS / TS / RAS:
2,41,00 ... ... 1 2,40,99
G.O.(Ms)No.78, Highways and Minor Ports(HQ2) Department, Dated:17.06.2020
Construction of ROB at Km 98/4 of Grand Anaicut Cauvery Poompattinam road(SH22) in lieu of existing LC No.229 at railway Km 283/600-700 in between Mayiladuthurai and AnandhathandavapuramRailway Stations. - Administrative Sanction - Accorded - Sanction
1881009.
Thanjavur Division (Projects)
AS / TS / RAS:
... ... ... ... 18,80,00
G.O. (Ms) No. 166/H & MP (HQ2) Dept., Dt: 23.12.2020
Land Acquisition for Construction of ROB at km 1/6 of Thudiyalur – Kovilpalayam road in lieu of existing LC.No.5 at Railway km 8/000-100 in between Coimbatore North and Karamadai Railway Stations (64 Lands
20520010.
Coimbatore Division (Projects)
AS / TS / RAS:
20,52,00 16,15,19 2,36,81 12,00 1
GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS)
200
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JG Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 03 101 JG 64 04( DPC )
Land Acquisition for Construction of ROB at km 0/10 of Thudiyalur - Saravanampatti road in lieu of existing LC.No.4 at Railway Km 6/800-900 in between Coimbatore North and Karamadai Railway stations (64 Lands)
8200011.
Coimbatore Division (Projects)
AS / TS / RAS:
8,20,00 ... 5,20,00 1 8,20,00
GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS)
Land Acquisition for Construction of ROB at km 1/8 of Pollachi-Pallakkad road in lieu of existing level crossing No.122 at Railway Km. 123/1-2 in between Pollachi and Kinathukadavu Railway Stations (64 Lands)
15170012. AS / TS / RAS:
15,17,00 5,37,55 1 1 1
G.O. Ms. No. 134 H&MP (HS2) Dept. dt. 31.08.2018
Land Acquisition for Construction of ROB @ Railway km 26/500-600 in liue of existing LC No.11 and construction of LUS at railway km 26/100-200 in between karamadai and Mettupalayam stations. (64 Lands)
16588313. AS / TS / RAS:
16,58,83 12,99,48 1 1 1
G.O. Ms. No. 110 H&MP (HS2) Dept. dt. 05.07.2018.
Construction of ROB at Km 0/2 of Sedapalayam–Vaikkalpalayam TP road branching at km 2/6 of the road from Annur road to Vadukankalipalayam at Railway Km 457/9-11 in lieu of existing LC.No. 137 in between Vanjipalayam and somanur Railway Station (64 Lands)
14750014. AS / TS / RAS:
14,75,00 7,23 1 2,50,00 2,50,00
GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS)
LA for Construction of ROB at km 3/2 of the road branching at km 133/8 of Salem - Cochin road to Karavazhi Madhappur (Via) Kaniyur in lieu of existing LC.No.141 at Railway Km 463/23-25 in between Somanur and Sulur Railway stations (64 Lands)
5000015. AS / TS / RAS:
5,00,00 2,03,21 2,96,79 1 1
GO.(MS) No. 111/H & M (HS2) Dept dt. 05.07.2018 (FS)
Construction of Road Over Bridge at Km 17/10 of Tharamangalam -Nangavalli-Kunjandiyur road lie of existing LC No.21 at Railway Km 31/9-10 in between Mecheri and Mettur Dam Railway Stations
5550016.
Salem Division (Projects)
AS / TS / RAS:
5,55,00 ... ... 5,55,00 1
G.O. (Ms)No.82/ Highways & Minor Ports(HP1) Dept., Dt. 18.06.2020
Construction of ROB at Km.12/8 of Suramangalam-Omalur road (via) Muthunaicken patty (MDR 696) in lieu of existing LC 7 at Railway Km.6/4-5 in between Magnesite and Omalur Railway Stations. (64 LANDS)
2521017. AS / TS / RAS:
2,52,10 2,52,10 1 1 1
G.O. (Ms)No.169/ Highways & Minor Ports(HP1) Dept., Dt. 16.10.2018
201
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
101 Bridges
JG Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 03 101 JG 64 04( DPC )
Construction of Road Over Bridge at Km 1/8 of Marthandam - Karungal Road(MDR-250) in lieu of existing Level Crossing No 15B at Railw;ay km 259/500-600 in between Kuzhitural and Eraniel Railway Stati;ons at Viricode.(64 lands)
018.
Tirunelveli Division (Projects)
AS / TS / RAS:
8,42,56 ... 8,42,56 30,05 8,12,52
G.O. Ms. No. 80 Highways and Minor Ports(HQ2) Department Dated 06.08.2019
Construction of Road Over Bridge at Km 0/8 of Rajapalayam-Vembakottai Road (SHU-186) in lieu of existing Level Crossing No 449 at railway Km 591/900-592/0 near Rajapalayam railway Station - 64 Lands
186500/19715019. AS / TS / RAS:
19,71,50 4,51,32 13,19,18 5,63,97 3,00,00
G.O. Ms. No. 117 Highways and Minor Ports(HQ2) Department Dated 12.07.2018 (FS)
456,70,07 123,35,05 156,83,72 84,15,16 165,16,095054 03 101 JGTOTAL -
202
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
03 State Highways
337 Road Works
JO Comprehensive Road Infrastructure Development Programme (CRIDP) - Formation of Bye-Passes
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JO
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 03 337 JO 16 00( DPC )
Widening to Double lane from Km.19/10 of coimbatore/ Nagapattinam Road (NH 83) to Km 31/2 of Paladam - Coachin frontier road (SH -163)(Via) Mullupadi, Myleripalayam and Chettipalayam(Alternate route from Pollachi to Coimbatore) (16 Major)
6288511.
Coimbatore Division (Projects)
AS / TS / RAS:
... ... 1 5,10,00 30,00,00
G.O. Ms. No.96Highways and Minor Ports(HS2) Department Dated 09.09.2019
Formation of Western Bypass to Pollachi Town starting from Zameen Uthukuli @ Km 81/0 of SH-19 to Achipatti @ Km 26/6 of NH-83(Via) Nallur, Thallakarai and R.Ponnapuram(16 Major Works)
4017762. AS / TS / RAS:
40,17,76 ... 15,00,00 10,25,00 25,00,00
G.O. Ms. No. 183 Highways and Minor Ports(HS2) Department Dated 08.11.2018
64 Lands 5054 03 337 JO 64 09( DPC )
Construction of Bypass-Forming by-Pass road to Thiruvallur town Km 0/0-6/546.(Land Acquistion Works) (64 Lands)
862823/8628231.
Chennai Division-I(Projects)
AS / TS / RAS:
86,28,23 2,93 1,00,00 1,17,29 10,05,00
G.O. Ms. No. 100 Highways and Minor Ports(HW2) Department Dated 01.10.2019
Formation of Western Bypass to Pollachi Town starting from Zameen Uthukuli @ Km 81/0 of SH-19 to Achipatti @ Km 26/6 of NH-83(Via) Nallur, Thallakarai and R.Ponnapuram(64 Lands)
566172.
Coimbatore Division (Projects)
AS / TS / RAS:
5,66,17 ... 50,01 5,66,17 ...
G.O. Ms. No. 183 Highways and Minor Ports(HS2) Department Dated 08.11.2018
Formation of By-Pass to Jalakandapuram town
3792003.
Salem Division (Projects)
AS / TS / RAS:
... ... ... 37,92,00 2
G.O. Ms. No. 93 Highways and Minor Ports(HP1) Department Dated 29.07.2020
132,12,16 2,93 16,50,02 60,10,46 65,05,025054 03 337 JOTOTAL -
203
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JE Construction / Reconstruction of Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 04 101 JE 16 08( DPC )
Construction of High Level Bridge across the River Kosathalaiyar at km. 11/7 of Tiruttani – Nagalapuram road (MDR 719) in lieu of existing causeway.
185740/1941641.
Chennai Division-I(Projects)
AS / TS / RAS:
... ... 7,42,96 3,18,00 16,23,67
G.O. (Ms) No. 45/H & MP (HW1) Dept., Dt: 24.02.2020
Constuction of HLB across Cheyyar at Km 11/2 of Uthiramerur- Kanchipuram Road
215557/2366182.
Chengalpattu Division (Projects)
AS / TS / RAS:
23,66,18 ... ... 10,00 10,02,00
G.O.(Ms) No. 102, Highways and Minor Ports (HW2) Department dated: 12.08.2020.
Reconstruction of Bridge across Varagha nadhi at Km 7/2-Gingee Vadapalai road
610153.
Cuddalore Division(Projects)
AS / TS / RAS:
... ... ... 1,00,00 5,10,15
G.O.(Ms) No.80 Highways and Minor Ports (HP1) Department dated: 18.06.2020
Construction of High LevelBridge at km 6/10 - 7/2 of Villupuram - kavanipakkam road across Malatar River.(16 major works)
165094/1771604. AS / TS / RAS:
17,71,60 ... 11,06,54 7,19,13 10,52,47
G.O.Ms.No.117, Highways (HP1) department dt. 25.10.2019
Reconstruction of High level Bridge across Vellar river at KM 104/2 of abandoned NH 45A near Bhuvangiri in Cuddalore District
225700/2257005. AS / TS / RAS:
22,57,00 17,23,83 1,00 1 1
G.O.(Ms.) No. 137 Highways and Minor Ports (HP 1) Department dated: 26.11.2015.
Construction of High Level Bridge across Uppanar river connnecting KM 6/8 of Chidambaram T.S. Pettai Road and Km 161/8 of PWD Coleroon river left bund road (Kodiyampalayam road) in Cuddalore District
100600/1100006. AS / TS / RAS:
11,00,00 6,51,39 61,00 1 1
G.O.(Ms.) No. 79 Highways and Minor Ports (HP 1) Department dated: 20.07.2015.
construction of High Level Bridge across the river coleroon at Kallanai connecting Thiruvanaikoil road and Grant Anaicut road. (16 Major Work)
598697/650000/9096007.
Thanjavur Division (Projects)
AS / TS / RAS:
90,96,00 63,14,02 1,26,55 23,86,44 3,95,54
G.O.Ms.No.142, Highways and Minor Ports (HP2) department dt. 11.11.2020.
204
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JE Construction / Reconstruction of Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 04 101 JE 16 08( DPC )
Reconstruction of High Level Bridge at Km 0/4 of Ayyampettai - Ganapathyagraharam road (O-658) across River Kudamuruti (branch of River Cauvery)
1215578.
Thanjavur Division (Projects)
AS / TS / RAS:
... ... 4,86,23 1 3,00,00
G.O.Ms.No. 38, Highways (H.P.2) department dt. 17.02.2020.
Construction of High Level Bridge across Kudamuruti River connecting Manathidal and Valapakudi Village Road (Balance Work)
20000/191009. AS / TS / RAS:
4,40,89 4,29,49 1 1 1
G.O.Ms.No. 120, Highways (HS2) Department dt. 30.6.2009
Construction of High level across pampar river with approaches near Chithrambur in Pudukottai district.
188170/16840010.
Trichy Division(Projects)
AS / TS / RAS:
16,84,00 13,32,83 1,88,53 2,84,65 66,52
G.O.Ms.No.138, Highways (HQ.1) department dt. 26.11.2015.
Construction of Foot Over bridge with Escalator Near Railway stations at Coimbatore city
80900/8890011.
Coimbatore Division (Projects)
AS / TS / RAS:
8,89,00 28,55 2,80,00 ... 1
G.O.(Ms) No. 91, Highways and Minor Ports Department dated: 04.08.2015.
Construction of Foot Over Bridge with Escalator near Nanjundapuram Junction at Coimbatore City
10720012. AS / TS / RAS:
10,72,00 2,67 ... ... 1
G.O.(Ms) No. 81, Highways and Minor Ports Department dated: 22.07.2015.
Formation of Outer Ring Road for Erode Town (Phase III) KM 7/6-14/8 including Construction of Road Over Bridge at KM 11/2-11/6 in Jeeva Nagar
693000/76200013.
Salem Division (Projects)
AS / TS / RAS:
76,20,00 65,63,03 8,78,02 8,83,46 1,73,51
G.O.(Ms) No. 172, Highways and Minor Ports Deparment dated: 23.10.2013
Construction of Grade Separator at Km 1/8 of Erode Perundurai Kankeyam road (near Government Hospital)(16 Major)(Preliminary Sanctioned)
4386214. AS / TS / RAS:
4,38,62 1,19,32 3,10,07 1,00 1,00
G.O. Ms.No. 5, Highways and Minor Ports (HS 1) Department dated: 20.1.2014
205
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JE Construction / Reconstruction of Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 04 101 JE 16 08( DPC )
Construction of High Level Bridge at Km 4/8 of Pappireddipatti Mallapuram road (M328) across Vaniyar River in Dharmapuri District
72500/7600015.
Salem Division (Projects)
AS / TS / RAS:
7,60,00 5,95,50 ... 1 ...
G.O.(Ms) No. 89, Highways and Minor Ports (HQ 2) Department dt. 3.8.2015.
Construction of Grade Separator at Km 3/2 of Madurai thondi road at Km 2/4 of Madurai Ring Road Junction
510900/56000016.
Madurai Divison (Projects)
AS / TS / RAS:
56,00,00 20,25,46 31,36,45 27,86,44 5,00,01
GO.Ms.No.118 Highways (HS1) Department dt.17.07.2018.
Arbitration in thr Work of Construction /Reconstruction of Bridges in Sivaganga - Virdhunagar and Ramnad District under package 15 of 106 Bridges between M/S TANTIA FREYSSISET - GILCON(jv) LTD.,KOLKATTA
3357617. AS / TS / RAS:
... 3,35,76 ... 1 1
(G.O.Ms. No.89/HMP(HQ1) Dept. dt.19.08.2019
64 Lands 5054 04 101 JE 64 07( DPC )
Construction of High Level Bridge across the River Kosathalaiyar at km. 11/7 of Tiruttani – Nagalapuram road (MDR 719) in lieu of existing causeway.
28751.
Chennai Division-I(Projects)
AS / TS / RAS:
... ... ... ... 18,75
G.O. (Ms) No. 165/H & MP (HW1) Dept., Dt: 22.12.2020
Construction of High LevelBridge at km 6/10 - 7/2 of Villupuram - kavanipakkam road across Malatar River.(64 lands)
44402.
Cuddalore Division(Projects)
AS / TS / RAS:
44,40 ... 93 40,00 4,10
G.O.Ms.No.117, Highways (HP1) department dt. 25.10.2019
Land Acquisition for construction of High Level Bridge across the river coleroon at Kallani connecting Thiruvanaikoil road and Grant Anaicut road.
11543/200003.
Thanjavur Division (Projects)
AS / TS / RAS:
2,00,00 42,36 1 5,00 1,52,64
G.O.Ms.No. 55, Highways (H.P.2) department dt. 04.03.2016.
206
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JE Construction / Reconstruction of Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 04 101 JE 64 07( DPC )
Land Acqusition for the Approach road of the Bridge Across Vellar at KM 135/8 of Manamadurai road and Bridge across Kundar at KM4/10 of Arimalam road-Court case W.P.No.7999 of 2005 Dt:28.06.2019
3834.
Trichy Division(Projects)
AS / TS / RAS:
3,83 ... ... 3,83 ...
G.O. Ms. No.254 Highways and Minor Ports(HP1) Department Dated 28.08.2020
Land Acquisition for forming and improving the road connecting NH7 (Sukkaliyur ) and NH 67 (Thaneerpandal) in Karur including Construction of HLB across Amaravathi river
2345005. AS / TS / RAS:
... ... ... 1 23,44,99
G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017
Land Acquisition for Construction of High Level Bridge across Tributary of the river Maruthayar at Km 4/8 of NH 45 to Kalapdi road (64 Lands
2300/23006. AS / TS / RAS:
23,00 ... 1 18,00 5,00
G.O. Ms. No. 97 Highways and Minor Ports(HQ2) Department Dated 08.06.2018
Land Acquisition for Construction of High Level bridge across the river cauvery in between unniyur in Tiruchirappali District and Nerur in Karur District
23700/237007. AS / TS / RAS:
2,37,00 10,02 1 1,38,00 88,98
G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017
Construction of Grade Separator at Km 1/8 of Erode Perundurai Kankeyam road (near Government Hospital)(64 Lands)(Preliminary Sanctioned)
185400/1854008.
Salem Division (Projects)
AS / TS / RAS:
18,54,00 ... ... 1 1
G.O. Ms.No. 5, Highways and Minor Ports (HS 1) Department dated: 20.1.2014
Land Acquisition for forming and Improving Western bye pass Road to Aruppukottai Town From NH 45B-NH 45 B Including Construction of ROB
3540009.
Tirunelveli Division (Projects)
AS / TS / RAS:
35,40,00 2,30,16 13,00,00 18,35,25 2,00,00
G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017
409,97,52 204,04,39 86,18,32 95,29,28 84,39,405054 04 101 JETOTAL -
207
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JJ Construction/Re Consuction of Elevated Highways
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 04 101 JJ 16 08( DPC )
CONSTRUCTION OF ELEVATED HIGHWAY ALONG AVINASHI ROAD IN COIMBATORE CITY FROM UPPILIPALAYAM TO CHINNIYAMPALAYAM-KALAPATTI AIRPORT.
162130001.
Coimbatore Division (Projects)
AS / TS / RAS:
1,621,30,00 ... 200,00,00 200,00,00 458,34,47
New work yet tobe issued
1,621,30,00 ... 200,00,00 200,00,00 458,34,475054 04 101 JJTOTAL -
208
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JQ Construction/ Reconstruction of bridges and improvement of roads with loan assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JQ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 04 337 JQ 16 05( DPC )
Reconstruction of of Bridge across Koraiyar river at Km 9/2 of Mannargudi - Thiruvarur road.
271341.
Thanjavur Division (Projects)
AS / TS / RAS:
2,71,34 2,42,61 1 1 1
G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003
Reconstruction of of Bridge across Vellaiyar river at Km 14/8 of Mannargudi - Thiruvarur road. RAS G.O. Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009.
149882. AS / TS / RAS:
1,49,88 97,87 1 1 1
G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003
Construction of High Level Bridge across Cauvery river Connecting Mohanur (Namakkal Dist.) and Vangal (Karur Dist)
4350003.
Salem Division (Projects)
AS / TS / RAS:
43,50,00 42,78,14 50 50 50
G.O.Ms.No. 38, Highways Department dt. 6.2.2008.
47,71,22 46,18,62 52 52 525054 04 337 JQTOTAL -
209
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 in bettween Attipatttu and Nandiyambakkam Railway Stations (16 Major Works) (Preliminary Sanctioned)
3000/30001.
Chennai Division-I(Projects)
AS / TS / RAS:
30,00 15,23 1 14,76 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge at Km 5/4 of Puduvayalpulikat Road in lieu of existing Level Crossing No. 26 at Railway Km 35/5-7 in between Ponneri and Kavaraipettai Railway Stations (16 Major Works) (Preliminary Sanctioned)
3000/30002. AS / TS / RAS:
30,00 16,39 1 10,00 3,61
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of existing LC.No.13 at Railway km 31/12-14 in between Thirunindravur and Veppampattu Railway Stations.
2872003. AS / TS / RAS:
28,72,00 14,45,51 7,58,92 31,09 2,00,01
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB in ieu ofexistingLC No.59 at Railay Km 68/16-18 in between Chengalpet and Ottivakkam Railway Stations Thirukalivakkam Raoad via Ponvilainthakalathur for Old GST Road (including Land Acquistion)
3040004.
Chengalpattu Division (Projects)
AS / TS / RAS:
33,24,00 7,18,55 8,10,00 2,00 9,00,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of four Lane Road Over Bridge at Km 72/10 of Chennai-Ponnerikarai Kancheepuram road in lieu of existing Level Crrossing No. 29 near Kancheepuram Railwlay Station (16 Major Works)
494220/5436005. AS / TS / RAS:
54,36,00 46,97,50 3,70,01 4,00,00 3,38,50
G.O.(2D) No. 200, Highways and Minor Ports (HQ2) Departmentt dated: 7.12.2011.
Construction of ROB in lieu of existing LC No.75 at Railway Km 97/15-16 in between Pakkam and Acharapakkam railway staions on Acharapakkam-Periakallakadi Raod (inculding Land Acquistion)
3230006. AS / TS / RAS:
32,30,00 6,36,25 5,02,00 1,00 5,00,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
210
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of ROB in lieu of existing LC No.64 at Railway Km 81/2-4 in between Padalam and Karunguzhi Railway stations of Kinar-Keevalam road (including Land Acquisition)
2950007.
Chengalpattu Division (Projects)
AS / TS / RAS:
32,21,70 5,87,64 8,10,00 1,00 9,00,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB in liew of existing LC No.55 at Railway Km 67/100-200 in between Thandarai and Thrivannamalai Railway Station (For Work)
387400/3874008.
Vellore Division(Projects)
AS / TS / RAS:
38,74,00 9,32,43 19,41,75 11,44,30 17,97,27
G.O.Ms.No.63/Highways& Minor Ports(HQ2)Dept/dt:- 25.04.2017
Construction of Road Over Bridge in lieu of existing Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at Km 141/4 of Cuddalore-Chittoor Road (16 Major Works) (For Work)
278700/2266009. AS / TS / RAS:
22,66,00 4,08,40 10,43,55 5,51,26 13,06,34
G.O.Ms.No.39/Highways& Minor Ports(HQ2)Dept/dt:- 20.03.2018
Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (16 Major Works) (For Work)
222689/22500010. AS / TS / RAS:
22,50,00 8,54,77 7,43,14 11,66,13 2,29,10
G.O.2(D)No.12/HW&MP Dept/Dt.23.02.18
Construction of ROB in lieu of existing L.C.No. 70 at Railway Km 4/8 of Ulli- Valathur Road
14100011. AS / TS / RAS:
14,10,00 2,92,77 5,15,00 7,99 11,09,24
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB in lieu of existing L.C.No. 78 at Railway Km 186/12-14 at Kannadikuppam - Iyyanur road
253000/27800012. AS / TS / RAS:
27,80,00 3,62,80 5,15,00 1 24,17,19
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB in lieu of existing L.C.No. 80 at Railway Km 195/28-30 at Valayampet - Vaniyambadu road .
255000/28100013. AS / TS / RAS:
28,10,00 10,64,99 5,15,00 6,01,00 11,44,02
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
211
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Road Over Bridge at KM 7/6 of Keelvithi Ameerpet road in lieu of existing LC No. 37 at Railway KM 80/6-8 near Anvarhiganpet Railway Station (16 MAJOR WORKS) (Preliminary Sanctioned)
320014.
Vellore Division(Projects)
AS / TS / RAS:
32,00 22,10 5,22 9,89 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of Road Over Bridge in lieu of existing Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at Km 141/4 of Cuddalore-Chittoor Road (16 Major Works) (Preliminary Sanctioned)
934415. AS / TS / RAS:
93,44 50,74 1 1 10,00
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of existing Level Crossing No. 55 at Railway Km 67/100-200 in between Thandari and Thiruvannamalai Railway Stations and at Km 103/8 of Pondy Krishnagiri Road (16 Major Works) (Preliminary Sanctioned)
2073416. AS / TS / RAS:
2,07,34 2,06,76 58 1 57
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of existing Level Crossing No. 123 at Railway Km 147/100-200 between Vellore cantonment and Kaniyambadi Railway Stations at Km 4/0 of Vellore-Hosur Road (16 Major Works) (Preliminary Sanctioned)
1286817. AS / TS / RAS:
1,28,68 27,67 1 3,01 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (16 Major Works) (Preliminary Sanctioned)
798718. AS / TS / RAS:
79,87 79,87 1 1 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of existing L.C.No. 126 at Railway Km 149/9-10 and L.C. 127 at Railway Km 150/9-10
363800/36500019. AS / TS / RAS:
36,50,00 19,92,83 20,00 35,00 1
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
212
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of ROB at Bethlegam area in Ambur Town between Ambur and Vaniyambadi Railway Stations 16 Major Works (Preliminary Sanctioned)
9500/950020.
Vellore Division(Projects)
AS / TS / RAS:
95,00 34,87 18,14 31,42 28,71
G.O.Ms.No. 40, Highways and Minor Ports (HQ 2) Department dated: 19.12.2013
Construction of ROB at km 1/6 of Olakkur – feeder road in lieu of existing LC No. 88 at Railway km 114/4-6 in between Olakkur and Tindivanam Railway stations
20960021.
Cuddalore Division(Projects)
AS / TS / RAS:
21,28,00 9,18,38 9,52,75 5,00,68 7,08,94
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROBat km 21/0 of Vellimedupettai - Mailam road in lieu of existing LC No. 102 at Railway km 134/28-30 in between Mailam
and Perani Railway stations
224300/24570022. AS / TS / RAS:
24,57,00 16,90,55 1,00 1,50,00 10,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB at km 0/4 of Vikravandi - Nemur road in lieu of existing LC No. 111 at Railway km 150/12-14 in between Mundiampakkam and Vikravandi Railway stations.
202000/21500023. AS / TS / RAS:
21,50,00 13,45,08 1,00 70,00 10,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of Road Over Bridge at KM 21/6 of Cuddalore-Chitttur road in lieu of exising L.C. No. 138 at Railway KM 185/3-4 in between Panrutti and Nellikuppam Railway Stations (16 MAJOR WORK) (Preliminary Sanctioned)
990024. AS / TS / RAS:
99,00 11,26 10,00 1 87,73
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (16 Major Works) (Preliminary Sanctioned)
786825. AS / TS / RAS:
78,68 10,10 1 1 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
213
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (16 Major Works) (For Work)
226300/24890026.
Cuddalore Division(Projects)
AS / TS / RAS:
24,89,00 11,24,28 11,89,73 10,86,62 1,39,00
G.O.(2D) No. 40, Highways and Minor Ports (HQ2) Department dated: 20.03.2018
Construction of RoadOverBridge in lieu of Level CrossingNo. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road between Railway Km15/500-15/600 atPeralam RailwayStationYardof MayiladuthuraiTthiruvarur Section (16Major) (Prleiminary)
594627.
Thanjavur Division (Projects)
AS / TS / RAS:
59,46 30,24 27,22 25 28,97
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of LC No. 20 at km 52/4 of Nagai-Gudalore-Mysore road in between Railway km 27/700-900 at Needamangalam yard in Needamangalam Railway Station of Thanjavur-Nagore-Karaikal Section(16 Major Works)(Preliminary Sanctioned)
2678828. AS / TS / RAS:
2,67,88 1,06,98 1,60,40 75 1,60,15
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of LC No. 34 at km 2/4 of Thiruvarur – Mannargudi - Muthupettai road in between Railway km 50/800 – 50/900 between Kuzhikarai – Thiruvarur Railway Stations of Thanjavur-Nagore-Karaikal Section (16 Major Works)
546829. AS / TS / RAS:
54,68 28,76 25,91 25 25,67
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of existing LC No. 48 at Railway km 77/700-800 between Nagore and Nagapattinam Railway Stations at km 0/2 of Nagapattinam - Akkaraipettai – Velankkanni Road (16 Major Works) (Preliminary Sanctioned)
1740430. AS / TS / RAS:
1,74,04 41,61 1,22,78 80 1,31,63
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge at Km 1/6 of Sirudhaiyur-Sengaraiyur road in lieu of existing Level Crossing No. 226 at Railway Km 311/800-900 between Kattur and Lalgudy Stations (16 Major Works)(Preliminary Sanctioned)
3327231.
Trichy Division(Projects)
AS / TS / RAS:
3,32,72 21,32 3,21,80 50,44 2,60,96
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
214
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Road Over Bridge at Km 1/8 of Keelakalkandar Kottai road in lieu of existing Level Crossing No. 323 at Railway Km 399/500-600 between Manjathidal and Thiruverumbur Railway Stations (16 Major Works) (Preliminary Sanctioned)
8235032.
Trichy Division(Projects)
AS / TS / RAS:
8,23,50 13,45 6,96,82 9,95 8,00,10
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge at KM 0/4 of Cauvery road in lieu of exising LC No. 249 at Railway Km 331/7-8 in between Srirangam and Trichy Town Railway Stations (16 MAJOR WORKS)(Preliminary Sanctioned)
70500/6800033. AS / TS / RAS:
6,80,00 16,33 6,82,69 5,00 6,58,67
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB in lieu of existing L.C.No.162 at Railway km.2/1-2 between pollachi -Anamalai railway station on KM 81/4 of Avinasi-Thiruppur-Palladam-Pollachi (Via) Cochin Road.
22600034.
Coimbatore Division (Projects)
AS / TS / RAS:
24,86,00 22,60,00 1 ... ...
G.O.(2D) No. 200. Highways and Minor Ports (HQ2) Departmentt dated: 07.12.2011
Construction of ROB at km. 20/6 of Kamanakenpalayam- Annur –road in lieu of existing LC.No. 139 at Railway km. 459/29-31 at Somanur. R.A.S G.O.Ms.No. 98, Highways and Minor Ports Department dated: 11.6.2012
112500/15880035. AS / TS / RAS:
19,54,00 16,32,95 1 1 1
G.O.Ms.No. 172, Highways (HQ2) Department, dt 23.08.2005.
Construction of ROB in lieu of existing LC No.3 at Railways km.2/1-2 between Pollachi-Anamalai Railway stations on km.81/4 of Avinashi-Tiruppur-Palladam-Pollachi-(Via) Cochin Road
204200/224500/33507536. AS / TS / RAS:
33,50,75 30,64,94 1 2,85,81 1
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB in lieu of existing L.C.No.10 at Railway km.25/6- between Periyanaikkenpalayam and Karamadai Railway stations on km.373/6 of Nagappattinam-Gudalore-Mysore Road
307000/337700/41400037. AS / TS / RAS:
41,40,00 35,46,05 1 3,61,35 1
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
215
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Road Over Bridge with Rotary at km 0/2 of Rasipalayam – Thennampalayam road in lieu of existing LC No. 142A at Railway km 466/21-23 in between Somanur and Sulur Railway Stations (16 Major Works) (Preliminary Sanctioned)
410038.
Coimbatore Division (Projects)
AS / TS / RAS:
41,00 15,92 1 1 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of existing LC No.3 at Railways km.2/9-11 between Coimbatore and Irugur Railway stations on km.0/4 of Ramachandra Naidu street (Coimbatore Corporation Road)
26700039. AS / TS / RAS:
26,70,00 5,44 1 5,10,00 1,10,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of Road Over Bridges at KM 144/4 of Old NH 7 in lieu of existing LC No. 38 at Railway KM 60/100-200 between Sivadi and Dharmapuri Railway Station (16 Major works) (Preliminary Sanctioned)
200040.
Salem Division (Projects)
AS / TS / RAS:
21,00 8,35 1 1 ...
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
Construction of ROB at km 0/6 of Bretts road in lieu of existing LC No. 185 at Railway km 190/400-500 in between Salem Market and Salem Town Railway Stations (16 Major Works) (Preliminary Sanctioned)
1750041. AS / TS / RAS:
1,75,00 23,52 1,48,73 8,90 1,42,58
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Rrailway Over Bridge in State Highways 79 at chainage 90/2 in Namakkal District 16 MAJOR WORKS
341600/ 35650042. AS / TS / RAS:
35,65,00 33,12,09 2,34,19 1,61,60 91,31
G.O.(2D) No. 21, Highways and Minor Ports (HQ2) Department dated 02.09.2013
Construction of Road Over Bridges at Km 3/4 of Haledharmapuri-Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 between Dharmapuri and Palcodu Railway Station (16 MAJOR WORKS)(Preliminary Sanctioned)
210043. AS / TS / RAS:
22,00 13,57 1 1 1
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
216
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Road Over Bridges at KM 0/8 of Vennampatty in lieu of existing LC No. 41 at Railwlay Km 65/600-700 between Sivadi and Dharmapuri Railway Stations. (16 Major works) (Preliminary Sanctioned)
300044.
Salem Division (Projects)
AS / TS / RAS:
30,00 15,84 13,44 13,44 72
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
Construction of ROB at Km.203/2 of VCC road in lieu of existing LC No.187 (Railway Km.192/300-400) in between Salem Junction and Salem Market Railway Stations
42140045. AS / TS / RAS:
46,35,00 36,57,01 8,89,06 3,96,61 1,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB at Km.1/8 of Hasthampatty Cherry road in lieu of existing LC No.184 (Railway Km.190/300-400) and LC.185 (Railway Km.190/400-500) in between Salem Market & Salem Town Railway Stations. (Cherry road LC.184)
585900/644000/83000046. AS / TS / RAS:
83,00,00 58,25,47 18,37,58 32,78,53 19,48,19
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB at Km.2/2 of Salem New Bye pass in lieu of existing LC No.183 Railway Km.189/400-500 between Salem Town and Salem East Railway Stations.
456300/501500/92400047. AS / TS / RAS:
92,40,00 15,66,75 34,41,25 34,41,25 47,07,25
G.O.(D) No. 150/Highways and Minor Ports (HP2) Department dt. 30.11.2020.
Construction of Road Over Bridges at KM 45/6 of Hogenakkal-Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at Railway KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (16 MAJOR WORKS)
226000/21220048. AS / TS / RAS:
21,22,00 18,59,93 2,89,13 1 1
G.O.(D) No. 146, Highways and Minor Ports (HQ 2) Department dated: 09.12.2015
Construction of Road Over Bridges at Km 3/4 of Haledharmapuri-Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 between Dharmapuri and Palcodu Railway Station (16 Major Works) (For Work)
203100/18900049. AS / TS / RAS:
18,90,00 17,26,94 1,76,63 1 1
G.O.(Ms) No. 146, Highways and Minor Ports (HQ 2) Department dated: 09.12.2015
217
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Road Over Bridge at L.C. No. 159 at Railway KM 164/600-700 in between Valappady and Minnampalli Railway Stations in Salem District
992050.
Salem Division (Projects)
AS / TS / RAS:
99,20 19,83 76,38 15,19 64,18
G.O.(D) No. 27, Highways and Minor Ports (HQ 2) Department dated: 12.12.2013
Construction of Road Over Bridges at KM 45/6 of Hogenakkal-Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at Railway KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (16 MAJOR WORKS) (Preliminary Sanctioned)
310051. AS / TS / RAS:
31,00 27,06 1 1 1
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
Construction of ROB at Km 0/8 of Sholavanthan-Valayapatty road (via) Andipati in lieu of existing L.C. 346 of Railway KM 473/500-600 in between Madurai-Dindigul Railway Stations (16 MAJOR WORKS) (Preliminary Sanctioned)
2320052.
Madurai Divison (Projects)
AS / TS / RAS:
2,32,00 71,79 1 1 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty Railway stations instead of Railway Km 5/700-800 (16 MAJOR WORKS)
20350053. AS / TS / RAS:
20,35,00 14,91,54 2,49,94 1,69,40 1,55,00
G.O.Ms.No. 83/ Highways & Minor ports (HQ2) Dept.dated: 22.07.2015
Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty Railway stations instead of Railway Km 5/700-800 (16 Major Works) Preliminary Sanctioned
910054. AS / TS / RAS:
91,00 31,74 1 1 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between Ramanathapuram and Ucchupuli Railway Stations (16 Major) (For Work)
233900/25600055. AS / TS / RAS:
25,60,00 6,22,38 13,80,70 7,76,46 7,15,16
G.O.Ms.No. 65/ Highways & Minor ports (HQ2) Dept.dated: 27.04.2018
218
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Limited Use Subway at KM 0/4 of Dindigul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 3/200-300 in between Dindigul and Akkaraipatti Railwlay Stations. (16 MAJOR WORKS) (For Work)
161800/17450056.
Madurai Divison (Projects)
AS / TS / RAS:
17,45,00 8,58,45 4,89,10 3,94,99 4,91,56
G.O.Ms.No. 104/ Highways & Minor ports (HQ2) Dept.dated: 22.12.2017
Construction of ROB at Km.1/500-2/700 of Dindigul – Manakkattur road in lieu of existing LCNo.2 @ Railway Km.1/10-11 in between Dindigul & Akkaraipatty stations) and LC No.27 at Railway km.72/200-300 in between Eriodu & Dindigul stations and LC 308
598000/65750057. AS / TS / RAS:
65,75,00 44,83,06 14,08,08 5,07,91 15,84,03
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of Road Over Bridge at km 203/2 of Tanjavur – Pattukottai – Aranthangi – Karaikudi – Kallal – Kalayarkoil – Maravanmangalam – Ilayankudi – Paramakudi – Mudukulathur – Sayalkudi – road – (SH-29) in lieu of existing LC.No.473 in railway km 578
371500/40850058. AS / TS / RAS:
40,85,00 31,22,22 1 1,20 1
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between Ramanathapuram and Ucchupuli Railway Stations (16 MAJOR WORKS) (Preliminary Sanctioned)
1565059. AS / TS / RAS:
1,56,50 1,27,27 1 1 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of Limited Use Subway at KM 0/4 of Dindivul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 3/200-300 in between Dindigul and Akkaraipatti Railwlay Stations. (16 MAJOR WORKS) (Preliminary Sanctioned)
1950060. AS / TS / RAS:
1,95,00 45,51 1 9,20 3,00
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween Palayamkottai Seidhungaanallur railway station. (16 MAJOR WORKS.)
23910061.
Tirunelveli Division (Projects)
AS / TS / RAS:
26,30,00 12,10,13 13,40,00 6,89,83 4,20,00
G.O.Ms.No. 32/ Highways & Minor ports (HQ2) Dept.dated: 18.02.2016
219
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of ROB at Km.0/0 - 8/0 AruppukottaiVirudhunagr Extension road lieu of existing level crossing 406 Km. 539/12-13 at Vpt - Tenkasi section
74000/8000062.
Tirunelveli Division (Projects)
AS / TS / RAS:
11,11,39 10,84,48 1 1 ...
G.O. Ms. No 9 Highways Department dated 8.01.1998
Construction of ROB at Km.60/2 of Tirunchendur - Palayamkottai - Ambasamudram - Tenkasi - Courtalam - Shencottai Road in lieu of existing L.C. 118A at Railway Km. 357/ 400-500 in between Melapalayam and Sengulam Railway station.
32700063. AS / TS / RAS:
32,70,00 16,56,52 5,01,00 68,00 5,02,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
Chief Engineer (General) Providing Light Arrangement to the Over Bridge at KM 1/4 of Thirunelveli Shengottai Road
29564. AS / TS / RAS:
2,95 2,94 1 ... ...
G.O. Ms. No1071 (PWD)dated 06.08.1974
Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween Palayamkottai Seidhungaanallur railway station. (16 MAJOR WORKS.) (Preliminary Sanctioned)
3730065. AS / TS / RAS:
3,73,00 3,46,30 1 5,00 20,00
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9-323/0 between Nanguneri and Valliyoor Railway Stations (16 Major Works) (Preliminary Sanctioned)
2272666. AS / TS / RAS:
2,27,26 44,22 1 2,01 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9-323/0 between Nanguneri and Valliyoor Railway Stations (16 Major Works) (For Work)
14520067. AS / TS / RAS:
15,17,00 5,91,55 7,86,08 7,93,77 1,00
G.O. (Ms) No.103, Highways and Minor Ports (HQ2) Department Dated 22.12.2017
220
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JJ 16 04( DPC )
Construction of Limited Use Subway (LUS) at Virudhunagar-Aruppukottai road as deposit work in lieu of temporary level crossing constructed during the construction of ROB at LC No.406.
10530068.
Paramakudi Division (N&RR)
AS / TS / RAS:
10,53,00 10,53,00 ... ... ...
G.O.(MS) No. 83, Highways and Minor Ports (HP.2) Department, dated: 25.05.2016
Construction of ROB at km 0/4 of Minjur - Kattur - Thirupalaivanam road in lieu of existing LC.No.16 at Railway km 24/16-18 in between Nandiyambakkam and Minjur Railway Station CE METRO
28320069.
C.E. Metro
AS / TS / RAS:
28,32,00 7,10,80 1,10,00 6,50,00 6,00,00
G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.
64 Lands 5054 80 800 JJ 64 03( DPC )
Construction of Road Over Bridge at Km 5/4 of Puduvayalpulikat Road in lieu of existing Level Crossing No. 26 at Railway Km 35/5-7 in between Ponneri and Kavaraipettai Railway Stations (64 Lands)(Preliminary Sanctioned)
681401.
Chennai Division-I(Projects)
AS / TS / RAS:
6,81,40 6,79,35 1,80 2,04 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 in bettween Attipatttu and Nandiyambakkam Railway Stations (64 Lands) (Preliminary Sanctioned)
1071672. AS / TS / RAS:
10,71,67 9,22,70 1,61,64 10,00 1,38,97
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of four Lane Road Over Bridge at Km 72/10 of Chennai-Ponnerikarai Kancheepuram road in lieu of existing Level Crrossing No. 29 near Kancheepuram Railwlay Station (64 Lands)
300003.
Chengalpattu Division (Projects)
AS / TS / RAS:
3,00,00 ... ... ... ...
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
221
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JJ 64 03( DPC )
Construction of Road Over Bridge in lieu of existingg Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at Km 141/4 of Cuddalore-Chittoor Road (64 Lands) (Preliminary Sanctioned)
430004.
Vellore Division(Projects)
AS / TS / RAS:
4,30,00 ... 4,20,00 1 4,30,00
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of existing Level Crossing No. 55 at Railway Km 67/100-200 in between Thandari and Thiruvannamalai Railway Stations and at Km 103/8 of Pondy Krishnagiri Road ( 64 Lands ) (Preliminary Sanctioned)
122585. AS / TS / RAS:
1,22,58 ... 1,12,58 1 1,22,58
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of existing Level Crossing No. 123 at Railway Km 147/100-200 between Vellore cantonment and Kaniyambadi Railway Stations at Km 4/0 of Vellore-Hosur Road (64 Lands) (Preliminary Sanctioned)
500006. AS / TS / RAS:
5,00,00 ... 1 1 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (64 Lands) (Preliminary Sanctioned)
350007. AS / TS / RAS:
3,50,00 1,00,00 2,40,00 65,83 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB at Bethlegam area in Ambur Town between Ambut and Vaniyambadi Railway Stations 64 LANDS (Preliminary Sanctioned)
550008. AS / TS / RAS:
5,50,00 ... 1,00,00 1 20,00
G.O.Ms.No. 40, Highways and Minor Ports (HQ 2) Department dated: 19.12.2013
Construction of Road Over Bridge at KM 7/6 of Keelvithi Ameerpet road in lieu of existing LC No. 37 at Railway KM 80/6-8 near Anvarhiganpet Railway Station (64 LANDS) (Preliminary Sanctioned)
30200/302009. AS / TS / RAS:
3,02,00 2,25,00 67,00 1 77,00
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
222
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JJ 64 03( DPC )
Construction of Road Over Bridge at KM 21/6 of Cuddalore-Chitttur road in lieu of exising L.C. No. 138 at Railway KM 185/3-4 in between Panrutti and Nellikuppam Railway Stations (64 LANDS) (Preliminary Sanctioned)
1110010.
Cuddalore Division(Projects)
AS / TS / RAS:
1,11,00 ... 1,10,00 50,00 61,00
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (64 Lands) (Preliminary Sanctioned)
1250011. AS / TS / RAS:
1,25,00 8,19 20,00 20,00 20,00
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge in lieu of Level Crossing No. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road between Railway Km 15/500-15/600at Peralam Railway StationYard ofMayiladuthurai-Thiruvarur Section(64lands)(Prleiminary work)
15825012.
Thanjavur Division (Projects)
AS / TS / RAS:
15,82,50 16,32 1 5,00,00 10,66,18
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of LC No. 20 at km 52/4 of Nagai – Gudalore - Mysore road in between Railway km 27/700 – 900 at Needamangalam yard in Needamangalam Railway Station of Thanjavur – Nagore – Karaikal Section. (64 Lands) (Preliminary Sanctioned)
8000013. AS / TS / RAS:
8,00,00 4,24,33 3,75,66 2,00,00 1,75,67
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of LC No. 34 at km 2/4 of Thiruvarur – Mannargudi - Muthupettai road in between Railway km 50/800 – 50/900 between Kuzhikarai – Thiruvarur Railway Stations of Thanjavur-Nagore-Karaikal Section (64 Lands)
20255014. AS / TS / RAS:
20,25,50 7,00,00 12,75,50 2,00,00 11,25,50
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB in lieu of existing LC No. 48 at Railway km 77/700-800 between Nagore and Nagapattinam Railway Stations at km 0/2 of Nagapattinam - Akkaraipettai – Velankkanni Road (64 Lands) (Preliminary Sanctioned)
22000015. AS / TS / RAS:
22,00,00 9,78,28 11,21,72 2,09,00 10,12,72
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
223
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JJ 64 03( DPC )
Construction of Road Over Bridge at Km 1/6 of Sirudhaiyur-Sengaraiyur road in lieu nof existing Level Crossing No. 226 at Railway Km 311/800-900 between Kattur and Lalgudy Stations ( 64 Lands ) (Preliminary Sanctioned)
17000016.
Trichy Division(Projects)
AS / TS / RAS:
17,00,00 8,58 16,90,00 16,90,00 1,42
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Consruction of Road Over Bridge at KM 0/4 of Cauvery road in lieu of exising LC No. 249 at Railway Km 331/7-8 in between Srirangam and Trichy Town Railway Stations (64 LANDS)(Preliminary Sanctioned)
10000017. AS / TS / RAS:
10,25,00 10,04,92 1 6,00 14,08
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of Road Over Bridge at Km 1/8 of Keelakalkandar Kottai road in lieu of existing Level Crossing No. 323 at Railway Km 399/500-600 between Manjathidal and Thiruverumbur Railway Stations (64 Lands) (Preliminary Sanctioned)
20000018. AS / TS / RAS:
20,00,00 2,36,38 17,64,37 2,83,22 14,80,40
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge with Rotary at km 0/2 of Rasipalayam – Thennampalayam road in lieu of existing LC No. 142A at Railway km 466/21-23 in between Somanur and Sulur Railway Stations (64 Lands) (Preliminary Sanctioned)
4365019.
Coimbatore Division (Projects)
AS / TS / RAS:
4,36,50 4,31,50 1 ... 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of Road Over Bridge at L.C. No. 159 at Railway KM 164/600-700 in between Valappady and Minnampalli Railway Stations in Salem District 64 LANDS (Preliminary Sanctioned)
6000020.
Salem Division (Projects)
AS / TS / RAS:
6,00,00 2,70,00 3,29,99 1,65,00 1,65,00
G.O.(D) No. 27, Highways and Minor Ports (HQ 2) Department dated: 12.12.2013
Construction of Road Over Bridges at Km 3/4 of Haledharmapuri-Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 between Dharmapuri and Palcodu Railway Station
3090021. AS / TS / RAS:
3,09,00 3,09,00 1 ... ...
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
224
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JJ 64 03( DPC )
Construction of Road Over Bridges at KM 45/6 of Hogenakkal-Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at Railway KM 67/700-800 between Dharmapuri and Palacode Railway Stations
12940022.
Salem Division (Projects)
AS / TS / RAS:
12,94,00 12,94,00 1 ... ...
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
Construction of Road Over Bridges at KM 144/4 of Old NH 7 in lieu of existing LC No. 38 at Railway KM 60/100-200 between Sivadi and Dharmapuri Railway Station (64 Lands) (Preliminary Sanctioned)
2190023. AS / TS / RAS:
2,19,00 ... 2,04,95 ... ...
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
Construction of Road Over Bridges at KM 0/8 of Vennampatty in lieu of existing LC No. 41 at Railwlay Km 65/600-700 between Sivadi and Dharmapuri Railway Stations. (64 Lands) (Preliminary Sanctioned)
11600024. AS / TS / RAS:
11,60,00 ... 10,10,00 10,10,00 1,50,00
G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012
Construction of Railway Over Bridge in State Highways 79 at chainage 90/2 in Namakkal District 64 LANDS
60000/8500025. AS / TS / RAS:
8,50,00 ... 1,26,46 1 1,26,45
G.O.(2D) No. 21, Highways and Minor Ports (HQ2) Department dated 02.09.2013
Construction of ROB at km 0/6 of Bretts road in lieu of existing LC No. 185 at Railway km 190/400-500 in between Salem Market and Salem Town Railway Stations (64 Lands) (Preliminary Sanctioned)
41850026. AS / TS / RAS:
41,85,00 41,85,00 1 1 1
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between Ramanathapuram and Ucchupuli Railway Stations (64 Lands) (Preliminary Sanctioned)
6750027.
Madurai Divison (Projects)
AS / TS / RAS:
6,75,00 5,14,00 1 1,61,00 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
225
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JJ Construction of over and under bridges in lieu of Existing level crossings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JJ 64 03( DPC )
Construction of ROB at Km 0/8 of Sholavanthan-Valayapatty road (via) Andipati in lieu of existing L.C. 346 of Railway KM 473/500-600 in between Madurai-Dindigul Railway Stations (64 LANDS.)(Preliminary Sanctioned)
12054028.
Madurai Divison (Projects)
AS / TS / RAS:
12,05,40 1,32,70 1 1 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty Railway stations instead of Railway Km 5/700-800 (64 Lands) (Preliminary sanctioned)
692529. AS / TS / RAS:
69,25 ... 1 10,00 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of Limited Use Subway at KM 0/4 of Dindigul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 3/200-300 in between Dindiul and Akkaraipatti Railwlay Stations. (64 LANDS) (Preliminary Sanctioned)
15425030. AS / TS / RAS:
15,42,50 15,42,50 1 1 1
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween Palayamkottai Seidhunganallur railway station. (64 LANDS.) (Preliminary Sanctioned)
3150031.
Tirunelveli Division (Projects)
AS / TS / RAS:
3,15,00 52,42 1 2,20,00 42,58
G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012
Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9-323/0 between Nanguneri and Valliyoor Railway Stations (64 Lands) (Preliminary Sanctioned)
10000032. AS / TS / RAS:
10,00,00 1,73,35 8,20,00 5,00 1,00
G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013
1,548,14,34 801,50,49 360,83,73 232,32,39 316,94,195054 80 800 JJTOTAL -
226
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JN Provision for Road Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JN
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JN 64 05( DPC )
Land Acquisition for forming Thuraiyur By-pass Phase -II (64 Lands)
2000001.
Trichy Division(Projects)
AS / TS / RAS:
20,00,00 5,05,16 10,00,00 10,08,05 5,86,79
G.O.(Ms) No. 113, Highways and Minor Ports (HP2) Departmentt dated: 06.07.2018
Widening to Double Lane from km 19/10 of Coimbatore-Nagapattinam road (NH 83) to km 31/2 of Palladam-Cochin Frontier road (SH 163) (Via) Mullupadi, Myleripalayam and Chettipalayam (Alternate route from Pollachi to Coimbatore) (64 Lands)
39000/0/2338802.
Coimbatore Division (Projects)
AS / TS / RAS:
23,38,80 ... 1 23,20,23 18,57
G.O. (Ms) No. 167/H & MP (HS1) Dept., Dt: 23.12.2020
Construction of ROB at Km1/10 of Hosur- Thenkanikttai (via) Thally road (SH17B) in lieu of existing LC104 at railway Km160/0-100 in between Hosur Anekkal railway stations.(64 Lands)
1367723.
Salem Division (Projects)
AS / TS / RAS:
13,67,72 ... 5,00,00 13,02,66 65,06
G.O. Ms. No. 210 Highways and Minor Ports(HQ2) Department Dated 12.12.2018
Land Acquisition for forming of By pass road to Shoolagiri town at Km 0/0 - 2/4 (64 Lands)
182544. AS / TS / RAS:
1,82,54 ... 1,72,54 1,80,00 2,54
G.O. Ms. No. 140 Highways and Minor Ports(HQ2) Department Dated 07.09.2018
Land Acquisition for Forming and Improving Western bye pass Road to Tirunelveli
7983005.
Tirunelveli Division (Projects)
AS / TS / RAS:
79,83,00 31,86 10,00,00 30,00 42,90,00
G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017
138,72,06 5,37,02 26,72,55 48,40,94 49,62,965054 80 800 JNTOTAL -
227
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in lieu of existing LC No 19 at Railway Km 19/14-15 between pazhavanthangal & meenambakkam Railway Stations
930001.
Chennai Division-I(Projects)
AS / TS / RAS:
9,30,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB connecting Pallavaram - Thuraipakkam Radial Road with NH-45 in lieu of the proposed ROB at the existing LC.No.26 near Vaishnava College
220000/2420002. AS / TS / RAS:
44,54,00 38,19,15 1,20,50 5,00 1,00,00
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009
Construction of Road Over Bridge in lieu of existing at LC. No.37 at Railway Km.49/4-6 in between Gummidipoondi and Elavur Railway Stations.
1700003. AS / TS / RAS:
17,00,00 ... 1 ... ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of Road Over Bridge in Obalapuram – Sunnambukkulathur Road at km 0/2 in lieu of existing LC. No.38 at Railway Km.52/8-10 in between Elavur and Akkampettai Railway
Station.
2337004. AS / TS / RAS:
23,37,00 21,98,54 35,51 1 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of Road Over Bridge in lieu of existing LC. No.21 at Railway Km.47/14-16 in between Kadambathur and Thiruvalangadu Railway Stations (Near Kadambathur Railway station)
149000/ 2574005. AS / TS / RAS:
25,74,00 21,79,22 2,87,99 1,75,26 2,19,52
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006. RAS G.O 27 dated 11.04.2017
Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 in bettween Attipatttu and Nandiyambakkam Railway Stations (FOR WORKS)
2962136. AS / TS / RAS:
... ... ... 1,00,00 11,39,50
G.O.(Ms) No.101 ,Highways and Minor Ports (HQ2) Department dated 12.08.2020
Construction of Road Over Bridge in lieu of existing LC No.10 at Railway Km.25/ 3-5 at Km.11/2of Poonamallee - Thandarai Road near Pattabiram Railway Stations.
1278007. AS / TS / RAS:
12,78,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
228
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB connecting Pallavaram - Thuraipakkam Radial Road with NH-45 in lieu of the proposed ROB at the existing LC.No.26 near Vaishnava College Land Acquisition.
2000008.
Chennai Division-I(Projects)
AS / TS / RAS:
22,00,00 15,83,32 1 1 1
G.O. Ms. No. 118, Highways (HW2) Department Dt.12.06.2003
Construction of ROB in lieu of existing LC No 29 at Km 2/2 of Chitlapakkam road at Railway Km 27/7-8 near Tambaram Sanatorium Railway Stations
1600009. AS / TS / RAS:
16,00,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of Road Over Bridge in lieu of existing LC. No.15 at Railway Km.35/30-32 in between Sevvapet and Putlur Railway stations
24500010. AS / TS / RAS:
20,00,00 16,29,23 4,17,27 3,70,76 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of Road Over Bridge in lieu of existing LC No.10 at Railway Km. 13/2-3 between Ennore and Kathivakkam Railway
Stations.
18820011. AS / TS / RAS:
18,82,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB in lieu of existing LC.No.37 at Railway Km.37/1-2 in Km.0/4 of Railway gate road near Urapakkam Railway Station.
29680012. AS / TS / RAS:
29,68,00 ... 1 ... ...
G.O. Ms. No. 71 Highways and Minor Ports (HW2) Dept., Dt.18.4.2012
Construction of ROB between Guduvanchery - Singaperumal Koil Railway Station in lieu of existing LC.No.47.
528900/58179013.
Chengalpattu Division (Projects)
AS / TS / RAS:
138,27,25 ... 50,00,00 10,00,00 60,00,00
G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008
Construction of ROB in lieu of LC.No.1 at Railway Km.1/700-800 in between Chengalpet and Old Seevaram railway station in Old GST road (Near Chengalpet)
31440014. AS / TS / RAS:
34,58,00 28,06,69 1 1 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
229
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in lieu of existing LC.No.36 in between Vandalur - Gduvanchery Railway Station at Railway Km.36/12 - 14 (Near
Urapakkam).
34500015.
Chengalpattu Division (Projects)
AS / TS / RAS:
37,95,00 27,49,21 3,00,00 2,60,00 3,00,00
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB between Vandalur- Guduvanchery Railway Station in lieu of existing of LC.No.40. near Guguvanchery Railway Station in between Vandalur and Guduvanchery Railway Stations
29040016. AS / TS / RAS:
31,94,00 21,90,89 30,00 1,15,50 20,00
G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008
existing LC.No.54 at Railway Km.61/1-2 in between Chengalpattu - Thirumani Railway stations at Km.27/0 of Sathurangapattinam - Kancheepuram road in Chengalpattu town.
270000/29700017. AS / TS / RAS:
43,92,52 43,92,43 1 8 1
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / RAS G.O.(2D) No. 7 Highways and Minor Ports Department dated: 1.3.2011
Construction of ROB between Kavanoor and Gudiyatham Railway Station in lieu of existing LC.No.63 at Km.8/2 of Kavanur Rusha Hospital to Pasumathur road.
19340018.
Vellore Division(Projects)
AS / TS / RAS:
19,34,00 ... 1 ... ...
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of ROB in lieu of existing LC.No.128 at Km.118/8 of Krishnagiri - Ranipet Railway Km.151/12-13 between vellore and Katpadi Railway Station.
226100/53350019. AS / TS / RAS:
53,35,00 5,83,19 1,00,00 5,00 15,00,00
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of ROB in lieu existing LC.No.86 at Km.1/8 of Jolarpet - Natarpalli road at Railway Km.211/4-6 of Jolarpet - Kethandapatti Railway Stations.
21570020. AS / TS / RAS:
23,72,00 20,75,00 4,00,00 1,67,99 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of a ROB in lieu of existing LC.No.69 near Valathur Yard at Railway Km,163/15-17 on Ulli - Kakathoppu Road at Km.0/2 (Near Ulli).
120000/13200021. AS / TS / RAS:
18,50,00 17,75,31 74,68 1 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
230
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in lieu of existing LC.No.82 at Km.55/6 of Krishnagiri - Ranipet road at Railway Km.198/34-36 of Vaniyambadi Kethandapattti Railway Stations.
195400/19540022.
Vellore Division(Projects)
AS / TS / RAS:
19,54,00 19,54,00 1 1 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of RUB in lieu of existing LC.No.81 in between Vaniyambadi - Keethandipatti Railway Stations near Vaniyambade Railway Yard at Railway Km.197/36-198 (Near Town Road).
13000023. AS / TS / RAS:
13,00,00 4,42,96 1,00,00 10,00 5,00,00
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of RUB in lieu of existing LC.No.66 in between Melathur Vallathur Railway Station near Railway Yard.
105000/115500/14264024. AS / TS / RAS:
14,26,40 13,58,16 1 68,23 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 G.O. Ms. No. 27, Highways Department, dt. 11.04.17
Construction of Road Over Bridge at km 0/2 of Lakshmi Ammalpuram to Navithampatti Road in lieu of existing level crossing No.72 at Railway Km 168/12-14 in between Melpatti and Valathur Railway Stations - Adminstrative Santion Accorded - Orders - Issued.
31945225. AS / TS / RAS:
... ... ... ... 31,93,53
G.O. (Ms) No. 115/H & MP (HQ2) Dept., Dt: 28.09.2020
Construction of ROB in lieu of existing LC.No.45A & 45B at Railway Km.101/17-19 & 101/18-20 near Walajah railway station at Km.4/3 of Walajah Sholingar Arrakonam road (SH).
15500026. AS / TS / RAS:
15,50,00 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of Road Over Bridge at Km. 5/4 of Pallikonda - Gudiyatham road in lieu of existing LC.No.64 at Railway Km.154/2-14 between Gudiyatham and Melalathur Railway Stations.
13770027. AS / TS / RAS:
13,77,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of Road Over Bridge at Km. 23/8 of Tirupathur - Bargur road in lieu of existing LC.No.90 at Km.222/7-9 between Tirupathur -
Moolakaranpatti Railway Stations.
116300/6000028. AS / TS / RAS:
6,00,00 5,45,13 1 1 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
231
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of Road Over Bridge at Km.56/0 of Dharmapuri - Tirupathur Road in lieu of existing LC.No.91 at Railway Km.223/0-1 between Tirupathur and Moolakaranpatti
133700/9100029.
Vellore Division(Projects)
AS / TS / RAS:
9,10,00 6,51,70 1 1 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB in lieu of existing LC.No.89 at Km.0/6 of Thirupathur Vallakkalnatham road at Railway Km.218/32-219/2 in between Jolarpet Thirupathur Railway Stations.
21540030. AS / TS / RAS:
23,45,00 22,35,59 1,09,40 1 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of ROB in lieu of existing LC.No.50 in Km.4/4 of Tiruvalam Katpadi road at Railway Km.120/14-16 between Sevur and Tiruvalam Railway Station.
122600/9600031. AS / TS / RAS:
9,60,00 9,24,96 1 1 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construciton of ROB in lieu of existing LC.No.33 at Railway Km.71A/36-38 in between Arakkonam and Thirutani Railway Stations.
133700/9000032. AS / TS / RAS:
9,00,00 7,41,90 1 1 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of Road Over Brdige at km 7/2 of Damalerimuthur road in lieu of existing level crossing No.92 at Railway km 220/500-600 in between Somanayakkanpatti and Pachur Railway Station - Adminstrative Santion Accorded - Orders - Issued.
18307133. AS / TS / RAS:
... ... ... ... 17,30,71
G.O. (Ms) No.116/H & MP (HQ2) Dept., Dt: 28.09.2020
Construction of ROB in lieu of existing LC.No.88 at Km.0/4 in Tirupathur - Natranpalli road at railway Km.217/8 - 10 in between Jolarpet - Tirupathur Railway stations.
120000/13200034. AS / TS / RAS:
16,36,10 16,10,58 1 1 1
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / R.A.S. G.O.Ms.No. 43, Highways and Minor Ports Department dated: 26.3.2013
Contruction of ROB at Km.0/10 of Salavathi road in lieu of existing L.C.No.93 at Railway Km.124/2-3 in Villupupra – Trichy main line (Olakur – Thindivanam road)
24500035.
Cuddalore Division(Projects)
AS / TS / RAS:
24,50,00 18,72,42 1,00 55,00 1,00
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
232
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station.
140000/15400036.
Cuddalore Division(Projects)
AS / TS / RAS:
22,44,00 21,98,56 1 1 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009
Contruction of ROB at Km.27/6 of Vikiravandi – Kumbakonam – Tanjavur road in lieu of existing L.C.No.135A at Railway Km.182/1-2 of Villupupram – Trichy main line . (Thiruthuraiyur – Panruti)
212500/23360037. AS / TS / RAS:
23,36,00 19,53,37 10,00 1,53,00 30,00
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB at KM 0/8 of Thanjavur – Pattukottai – Road in lieu of LC No. 303 at Railway KM 353/1-2 in between Thanjavur and Thittai Railway Stations. RAS G.O.Ms.No. 143, Highways and Minor
Ports Department dated: 22.4.2010
130100/95667/18440038.
Thanjavur Division (Projects)
AS / TS / RAS:
18,44,00 18,25,37 ... 1 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at KM 26/2 of Perambalur - Manamadurai Road in lieu of LC No.201 at Railway KM 270/0-100 in between Ariyalur and Sillakgudi Railway Stations.
284000/ 31230039. AS / TS / RAS:
31,23,00 24,37,73 3,24,87 3,89,80 2,95,47
GO Ms. No.236 / Highways (HQ -2) Department Dated. 3.10.2008
Construction of ROB at KM 40/4 of Trichy - Chidambaram Road in lieu of LC No.206 at Railway KM 284/9 to 285/0 in between Sillakgudi and Kallagam Railway Stations.
29000040. AS / TS / RAS:
29,00,00 4,49,50 19,82,54 8,02,30 16,48,20
GO Ms. No.272 / Highways (HQ -2) Department Dated. 13.11.2007
Construction of R.O.B. in lieu of existing L.C.No.325 at Railway Km 406/13-14 in between Trichy and Kumaramangalam Railway Stations at Km 1/4 of NH 45 - B. (Trichy - Viralimalai, Madurai Aruppukottai and Thuthukudi road)
285800/31430041.
Trichy Division(Projects)
AS / TS / RAS:
40,20,00 34,56,04 1 5,00 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
233
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Reconstruction of Bridge (with Four - lane Carriageway) at Km 314/10 of Chennai -Trichy - Dindigul road near Thiruvanaikoil in lieu of Old bridge (Bridge No.380-A) at Railway Km 329/10-11. (For WORKS)
384000/42700042.
Trichy Division(Projects)
AS / TS / RAS:
56,00,00 49,83,45 2,88,77 3,31,28 1,00
G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.
Reconstruction of at Km 0/2 of M.S.P. Camp road near Thiruchirappalli Railway Junction in lieu of existing Old Bridge at Railway Km 340/4-5 (Bridge No.1136) in Trichy-Dindigul Section (For WORKS)
63440043. AS / TS / RAS:
79,38,25 60,08,04 2,83,47 6,81,28 12,49,03
G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.
Construction of R.O.B. in lieu of existing L.C.No.281 at Railway Km377/100 - 200 in between Manaparai and Chettiapatti Railway Stations at Km 1/4 of Old G.S.T. Road.
21530044. AS / TS / RAS:
21,53,00 ... 1 ... ...
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of ROB in lieu of L.C.No.279 in between Samuthiram - Manapparai Railway station at Railway Km 375/8-9 on Musiri - Kulithalai - Pattukotai - Alankudi - Sethupavasathiram Road at Km 41/2 (Manapparai Town)
28000045. AS / TS / RAS:
28,00,00 ... 1 ... ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB in lieu of L.C.No.228 in between Kattur - Lalgudi Railway station at Railway Km 313/3-4 on Siruthaiyur - Kollidam Anaicut Road at Km 0/4 (Lalgudi Town)
205000/26600046. AS / TS / RAS:
30,15,60 26,52,00 1 3,37,00 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 / G.O. Ms. No. 82, Highways Department, dt. 25.05.16
Construction of ROB in lieu of L.C.No.248 in between Srirangam - Trichy Railway station at Railway Km 331/0-1 on Cauveri South Bank Road at Km 0/4 (Near Trichy Town Railway Town)
260000/28500047. AS / TS / RAS:
49,50,00 47,98,48 1 1,96 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB at Km 35/8 of Gobi – Uthukuli Kangeyam Road L.CNo.128 in between Uthukuli – Tiruppur Railway station.
13370048.
Coimbatore Division (Projects)
AS / TS / RAS:
13,37,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
234
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB. at km.1/0 of Rathinapuri – Sanganur road Gandhipuram 7th street in lieu of existing L.C.No.11 at Railway km.12/19-21 in between Peelamedu and Coimbatore North Railway station.
195000/214500/33030049.
Coimbatore Division (Projects)
AS / TS / RAS:
33,03,00 21,45,32 1 1 1
G.O. Ms. No. 82, HW&MP (HQ2) Department, dt. 25.05.2016
Construction of RUB. at km.0/2 of Gandhiji salai (Theirettery) to Kannapan Nagar road in lieu of existing L.C.No.13 at Railway km.13/25-27 in between Peelamedu and Coimbatore North Railway station.
14000050. AS / TS / RAS:
14,00,00 12,60,11 1 1,39,88 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB at km. 2/0 of Mangalam Avinashi road in lieu of LC.No. 134 at Railway km. 450/13-15 at Vanchipalayam yard.
17000051. AS / TS / RAS:
17,00,00 ... 1 ... ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB. at km.0/6 of Singanallur - Vellalore road in lieu of existing L.C.No.146 at Railway km.476/22-24 in between Irugur and Podanur Railway station. RAS GO No. 105 Dated 28.06.2018
235000/258000/32872052. AS / TS / RAS:
32,87,20 29,43,26 1,88,12 2,62,00 81,74
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB. at km.2/10 of Kuruchi - Nachipalayam road in lieu of existing L.C.No.151 at Railway km.450/1-12 in between Podanur – Madukkarai stations.
14050053. AS / TS / RAS:
14,05,00 ... 1 ... ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB at km 1/2 of Valankulam bypass road in lieu of existing LC.No.20 at Railway km 18/23-25 between Coimbatore and Podanur Railway stations
140000/ 15400054. AS / TS / RAS:
15,40,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at km. 0/2 of Coolipalayam RS to Vavipalayam road in lieu of LC.No.130 at Railway km. 435/12-14 in between Uthukuli – Tiruppur Railway station.
17000055. AS / TS / RAS:
17,00,00 ... 1 ... ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
235
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB. at km.0/10 of Pollachi-Valparai road in lieu of existing L.C.No.118 at Railway km.120/7-8 in between Gomangalam-
Pollachi Railway stations.Location: Pollachi Town.
15903556.
Coimbatore Division (Projects)
AS / TS / RAS:
15,90,35 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB at km 11/6 of Tiruppur – Vijayamangalam Road L.C.No.129 between Uthukuli – Tiruppur Railway Station.
13370057. AS / TS / RAS:
13,37,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at km 334/6 of Nagapattinam – Gudalore – Mysore road in lieu of existing L.C.No.145 at Railway km.477/10-12 within Coimbatore Corporation limit (Ondipudur).
16500058. AS / TS / RAS:
16,50,00 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB. at km.1/2 of Udumalpet-Chinnar road in lieu of existing L.C.No.95 at Railway km.92/16-17 in between Udumalapettai-Gomangalam Railway stations. RAS G.O.(2D) No. 7 Highways and Minor Ports Department dated: 1.3.2011
23940059. AS / TS / RAS:
23,94,00 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB. at km.3/10 of Ramanathapuram- Podanur road in lieu of existing L.C.No.21 at Railway km.21/43-45 (B.G) Km.162/14-15 (M.G) in between Coimbatore and Podanur junction.
17220060. AS / TS / RAS:
17,22,00 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB. at km.2/10 of Sulur-Nilambur road in lieu of existing L.C.No.143 at Railway km.468/18-20 in between Somanur and
Sulur road Railway stations.
122500/111600/12799161. AS / TS / RAS:
12,79,91 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 74, Highways Department, dt. 29.03.17
Construction of ROB. at km.0/10 of Irugur and Chinniampalayam road in lieu of existing L.C.No.144 at Railway km.475/22-24 in between Irugur – Podanur Railway stations. RAS GO 170 Dated 29.06.2018
158500/21100062. AS / TS / RAS:
27,09,20 25,86,75 1 22,64 1
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / R.A.S. G.O.Ms.No: 190, Highways Dept. Dated: 11.10.2010
236
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB at Km.17/4 of Edapady Magudan-chavadi road in lieu of existing LC.116 at Railway Km.354/32-34 between Magudan-chavadi – Maveli-palayam station
133700/8750063.
Salem Division (Projects)
AS / TS / RAS:
8,75,00 2,62,54 ... 1 ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at Km. 0/10 of Omalur-Sankagiri road in lieu of existing LC. No.9 at Railway Station.
129500/9510064. AS / TS / RAS:
9,51,00 7,40,11 ... 1 ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at km. 6/8 of Suramangalam Road in lieu of Existing LC. 113 Railway Km. 332/8-10 Between Salem Junction and Magnesite stations)And also lies in Salem corporation limits)
225000/17550065. AS / TS / RAS:
17,55,00 12,33,10 ... 1 ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB in Thirupparan-kundram town road in lieu of existing LC No.370 at Railway Km.500/6-7 between Madurai –
Thirupparan-kundram Railway station.
22000066.
Madurai Divison (Projects)
AS / TS / RAS:
22,00,00 21,70,87 1 26,16 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB at Km.419/4 of Chennai-Trichy-Dindigul road in lieu of existing LC.No.5 at Km.3/100-200 in between Dindigul-
Akkaraipatty Railway Station.
176500/16540067. AS / TS / RAS:
16,54,00 16,15,56 1 38,44 1
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of ROB at Km.438/6 of BCC road (SH) in lieu of existing L.C.No.363 at Railway Km.494/4 of Madurai - Dindigul section near Sellur.
28988768. AS / TS / RAS:
28,98,87 ... 1 ... ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at Km 153/10 of Madurai Kanyakumari (NH7) in lieu of existing LC.4 at Railway Km 4/8-9 at Tirunelveli & Seithunganallur Railway Stations.
25510069.
Tirunelveli Division (Projects)
AS / TS / RAS:
25,51,00 13,20,50 12,27,73 8,77 10,00
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
237
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB at Km. 94/2 of Madurai - Kanyakumari road SH in lieu of existing L.C. No. 440 at Raillway Km. 588/9-10 between Kovilpatti and Kumarapuram Railway stations
129500/7689070.
Tirunelveli Division (Projects)
AS / TS / RAS:
7,68,90 6,95,17 1 73,73 1
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at 132/6 of Madurai Tuticorin road SH in lieu of Existing L.C.No.485 at Railway Km.651/12-13 at Tuticorin between Meelavitan and Tuticorin stations
129500/111400/16050071. AS / TS / RAS:
16,05,00 16,04,91 2 2 2
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 45, Highways and Minor Ports Department dated: 26.3.2013
Construction of ROB at Km 0/8 of Tenkasi - Madurai road in lieu of existing L.C. No. 502 at Railway Km. 660/8-9 between Tenkasi and Shencottai Railway stations
24500072. AS / TS / RAS:
24,50,00 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB at Km 1/4 of Nagercoil - Balamore road in lieu of existing L.C. No 32B at Railway Km 280/6-7 between Nagercoil Junction and Nagercoil Town (Eraniel)
21400073. AS / TS / RAS:
21,40,00 ... 1 ... ...
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB in lieu of LC. No. 486 &487 in between Milavittan - Tuticorin Railway station at Railway Km. 652/11-12 and 653/6-7
27500074. AS / TS / RAS:
27,50,00 76,89 1,00 1 1
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of RUB in lieu of existing L.C.No. 9 at Railway Km 23/22-4 in between Avadi - Pattabiram Railways Stations (Near Hindu College Railway station) (CE N & RR)
85500/20580075.
Chenglepet Division (N&RR)
AS / TS / RAS:
20,58,00 11,35,14 9,32,44 6,71,98 2,50,88
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of RUB in lieu of existing L.C.No. 16 at Railway Km 38/22-4 near Putlur Railway station at Km.1/4 of Kakkalur Putlur road. (CE N & RR)
104200/33090076. AS / TS / RAS:
33,09,00 11,41,60 19,00,05 6,22,14 12,77,91
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.27, Highways and Minor Ports Dept. dated 11.04.17
238
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of Road Over Bridge in lieu of existing L.C.No.2 at Railway Km.1034-1035 between Pattabiram and Pattabiram West Railway Station at Km.67/4 of Tirupathi Renigunta Thiruttani-Chennai road (NH.205) (CE N & RR)
334800/52110077.
Chenglepet Division (N&RR)
AS / TS / RAS:
52,11,00 19,79,32 35,10,05 5,90,74 26,40,94
G.O. Ms. No. 39/Highways & Minior Ports (HQ2) Dept. dated 01.03.11 / G.O. Ms. No. 27/Highways & Minior Ports (HP2) Dept. dated 11.04.17
Construction of ROB in lieu of existing L.C.No. 7 at Railway Km 17/34-18/2 in between Ambattur - Avadi Railways Stations (Near Annanur Railway station) (CE N & RR)
156000/52980078. AS / TS / RAS:
52,98,00 43,99,31 7,74,89 8,98,68 1
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 27, Highways Department, dt. 11.04.17
Construction of ROB in lieu at L.C.No.2 at Railways Km 2/2-3 between Villupuram-Venkatesapuram railway of Villupuram Katpadi section at road Km.158/8 of NH.45A towards Villupuram town. (CE N & RR)
31600079.
Cuddalore Division (N&RR)
AS / TS / RAS:
34,75,00 30,85,16 1,54,00 1,45,50 1
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010
Consultancy services for preparation of Detailed project report for the work of Construction of RUB in lieu of existing LC No.304 at Railway KM.354/4-5 between Thanjavur Railway station and Railway yard. (CE N & RR) RAS GO No 27 H&MP Dated 11.04.2017
410000/42850080.
Thanjavur Division (N&RR)
AS / TS / RAS:
52,12,00 51,93,44 ... 1 ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB at Km.50/220 of NH67 (Nagapattinam-Gudalore-Mysore road) in lieu of existing L.C.No.22 in Railway Km.31/3-4 in Koradachery Station. (CE N & RR)
231900/231900/27170081.
Nagapattinam Division (N&RR)
AS / TS / RAS:
27,17,00 25,77,47 ... ... 5,03
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.78,Highways (HP2) and Minor Ports Dept. dated 28.09.17
239
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in lieu of existing L.C.No.5 in between Irugur - Peelamedu Railway station at Railway Km 3/21-23 on Neelikonam palayam - SIHS Colony Road at Km 1/6 Near SIHS Colony (CE N & RR)
170000/58520082.
Coimbatore Division (N&RR)
AS / TS / RAS:
58,52,00 28,80,63 1,57,95 11,00 29,60,37
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 / G.O. Ms. No. 27, Highways Department, dt. 11.04.17
Construction of ROB at Km 0/6 of Thaneerpandal road in lieu of existing L.C.No.6 at Raiway Km 6/15-17 in between Singanallur - Peelamedu Railway Stations (CE N & RR)
12650083. AS / TS / RAS:
12,65,00 10,34 1,63,53 2,09,85 10,44,81
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006
Construction of ROB in lieu of existing LC No.9 in between Peelamedu - Coimbatore North Railway station at Railway Km 10/19-20 on Ganapathy - Avarampalayam Road at Km 0/8 (Avarampalayam). (CE N & RR) RAS GO No 56 H&MP Dept Dated 25.04.2018
205000/22550084. AS / TS / RAS:
54,70,00 46,57,65 7,02,47 8,12,35 ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of RUB in lieu of LC No.4 at Km 3/3-5 in between Irugur-Peelamedu station in Irugur Coimbatore section. (CE N & RR)
21160085. AS / TS / RAS:
21,16,00 17,79,78 1,89,59 1,61,00 1,75,22
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010
Construction of ROB in lieu of LC No.7 at Km 8/1-3 in between Irugur-Peelamedu station in Irugur Coimbatore section. (CE N & RR)
30500086. AS / TS / RAS:
30,50,00 29,33,12 1,11,88 75,96 40,92
G.O. Ms. No. 39/Highways & Minior Ports (HQ2) Dept. dated 01.03.11
Construction of LUS in lieu of LC No.10 at Km 11/33-35 in between Peelamedu Coimbatore North section in Irugur Coimbatore section. (CE N & RR)
11900087. AS / TS / RAS:
11,90,00 2,29 1 ... ...
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010
Construction of ROB at Km 0/2 of Irugur Town Panchayat office road in lieu of L.C.No.2 at Railway Km 1/11-13 in between Irugur - Peelamedu Railway station. (CE N & RR)
186900/25620088. AS / TS / RAS:
25,62,00 21,88,75 3,74,58 2,00,28 1,72,97
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
240
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in at Railway Km 394/10-12 in between Erode and Thottipalayam railway station in lieu of L.C.No.124 of Erode Chennimalai road to Periyasadayampalayam Road at Km.0/2. (CE N & RR)
91800/10098089.
Erode Division (N&RR)
AS / TS / RAS:
10,09,80 ... 1 ... ...
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010
Construction of ROB in lieu of existing LC No.132 in between Uthukuli - Tiruppur Railway station at Railway Km 440/26-28 on Tiruppur - Vavipalayam Km Road at Km 0/2 SRC Mill Gate)
2000004/8256590. AS / TS / RAS:
48,25,65 39,21,03 2,67,58 1,30,00 7,16,74
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB in lieu of existing LC No.133 in between Uthukuli - Tiruppur Railway station at Railway Km 441/9-11 on Tiruppur Kongu Main Road At Km 0/2 (Kongu Nagar) (CE N & RR)
200000/27680091. AS / TS / RAS:
27,68,00 ... 1 ... ...
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of ROB at Km.1/2 of Munarai-Thotti Mannarai Road in lieu of L.C. 131 at Railway Km.438/4-6 in between Uthukuli and Tiruppur Railway Station. (CE N & RR)
13380092. AS / TS / RAS:
18,18,90 4,16,60 14,02,30 1,00,00 13,02,30
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.27, Highways (HP2) and Minor Ports Dept. dated 11.04.17
Construction of RUB at Dindigul Hanumanthanagar in lieu of existing L.C. No.309 at Railway Km.431/900-432 in Dindigul yard. (CE N & RR)
240000/26400093.
Madurai Division (N&RR)
AS / TS / RAS:
26,40,00 22,57,36 3,23,00 3,82,55 ...
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010
Construction of ROB at Km 0/2 of Madurai - Kanyakumari road in lieu of existing L.C. No.366 at Railway Km 496/18-497/1 at Palanganatham between Madurai junction and Tiruparankundram Railway Stations (CE N & RR)
300000/33000094. AS / TS / RAS:
46,27,50 33,12,42 12,79,52 1,00 13,14,08
G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 78, Highways Department, dt.28.09.17
241
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in lieu of L.C. No.371 at km 1/2 of Thiruparamkundram Municipal road at Railway Km 501/400-500 in between Madurai Tiruparankundram Railway Stations
24530095.
Madurai Division (N&RR)
AS / TS / RAS:
19,20,00 16,02,57 3,07,43 1,00 3,16,43
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008
Construction of ROB at railway Km 538/500-600 in lieu of existing LC No. 403 between Virudhunagar and Thulukkapatti Rly stations (Virudhunagar Town) (CE N & RR)
205300/26752096.
Paramakudi Division (N&RR)
AS / TS / RAS:
26,75,20 20,84,30 1 24,57 ...
G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 / G.O. Ms. No. 71, Highways Department, dt. 10.10.17
Construction of a RUB in lieu of existing L.C.No. 439 at Railway Km 587/6-7 between Kovilpatti and Kumarapuram Railway stations at Km 40/2 of paruvakudi - kovilpatti - Ettayapuram road (SH.44)
129500/17190097.
Tirunelveli Division (N&RR)
AS / TS / RAS:
17,19,00 14,50,79 3,40,21 2,68,21 ...
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of ROB at Km.147/8 of NH-7 (Madurai-Kanniyakumari Section) in lieu of existing L.C.No.18 of Railway Km 27/500-600
between Tirunelveli Junction and Yard.
29120098. AS / TS / RAS:
29,12,00 19,00,18 10,11,89 1,31,79 1,00,00
G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010
Construction of ROB in lieu of Existing LC No.13 in between Ennore and Athipattu Railway station at Railway KM 29/28-30 (near Athipattu Station) CE (C & M)
170000/23297099.
Thiruvallur Division (C&M)
AS / TS / RAS:
23,29,70 20,01,06 3,24,64 10,00 10,00
G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007
Construction of RUB in liew of existing LC.No.22 at Railway Km 21/10-11 near Trisulam Railway station. CE (METRO)
140000100.
C.E. Metro
AS / TS / RAS:
14,00,00 9,26 10,00 1,00 5,00,00
G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000
Construction of Limited use RUB in lieu of existing LC No.27 at Chrompet Radha Nagar main road near chrompet Railway station. CE (METRO)
147600101. AS / TS / RAS:
28,99,00 7,23,42 5,20,09 3,18,00 14,55,48
G.O.Ms.No.245 Highways Department Dt: 5.12.03
242
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
16 Major Works 5054 80 800 JT 16 04( DPC )
Construction of ROB in LC - 3 in between Thandayarpet -Thiruvotriyur Railway Station near Thiruvotriyur Mattumandai CE (METRO)
470000/ 580500102.
C.E. Metro
AS / TS / RAS:
58,05,00 56,19,82 1 1,00 1
G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010. / G.O.MS.No. 75, Highways (HP1) Department dt. 23.09.17
Construction of RUB in LC.No.4 in between Thiruvotriyur - Ennore (near Thiruvotriyur Railway Stations) CE (METRO)
280000103. AS / TS / RAS:
28,00,00 13,86,58 5,20,00 10,00 7,00,00
G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.
Construction of ROB at LC No.5 in between Villivakkam & Ambatthur Railway Stations Near Pattravakkam CE (METRO)
350000104. AS / TS / RAS:
35,00,00 34,83,84 16,15 16,14 2
G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.
Construction of RUB in LC.No.6 in between Thiruvotriyur - Wimco Nagar Railway Station. CE (METRO)
255000105. AS / TS / RAS:
25,50,00 13,55,35 5,20,00 10,00 5,00,00
G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.
Constuction of ROB in LC.No. 32 & 33 in lieu of L.C. 33 in between Tambaram Vandalore Railway Stations (Near Standard Motors) CE (METRO)
760000/2060800106. AS / TS / RAS:
206,83,00 39,40,26 65,00,98 14,00,00 66,00,00
G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.
Construction of limited use subway in liey of existing LC No. 4 at Railway Km 11/32-11/34 near Korattur Railwy Station Revised Adminstrative Santion Accorded - Orders - Issued.
199700/219600/259700107. AS / TS / RAS:
25,97,00 20,73,03 1 1,22,96 4,01,02
G.O. (Ms) No. 163/H & MP (HW1) Dept., Dt: 19.12.2020
Construction of R.O.B. in lieu of L.C. 14 in between Tirunindravur Tiruvallur (Near Veppampattu railway station) CE (METRO)
295000108. AS / TS / RAS:
29,50,00 6,89,78 22,60,21 15,00 7,50,00
G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.
64 Lands 5054 80 800 JT 64 03( DPC )
243
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JT Construction of Railway Over Bridges /Railway Under Bridges
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 4 Chief Engineer (Highways) - Projects
64 Lands 5054 80 800 JT 64 03( DPC )
Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station. (64 Lands) CHARGED
333961.
Cuddalore Division(Projects)
AS / TS / RAS:
3,75,40 3,68,45 ... 1 1
G.O. (D) No 78 &96 Highways and Minor Ports (HP-1) Department Dated 11.04.2017& 26.04.2017
Reconstruction of Bridge (with Four - lane Carriageway) at Km 314/10 of Chennai -Trichy - Dindigul road near Thiruvanaikoil in lieu of Old bridge (Bridge No.380-A) at Railway Km 329/10-11 (Land Acquisition) 64 LANDS LA GO No 161 H&MP Dated 28.09.2018
460002.
Trichy Division(Projects)
AS / TS / RAS:
69,00,00 30,45,61 1 38,54,39 1
G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.
Reconstruction of at Km 0/2 of M.S.P. Camp road near Thiruchirappalli Railway Junction in lieu of existing Old Bridge at Railway Km 340/4-5
(Bridge No.1136) in Trichy-Dindigul Section. 64 LANDS (Land Acquisition)
1056003. AS / TS / RAS:
36,20,42 29,23,04 7,41,48 1 6,97,37
G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.
Construction of ROB at Km.438/6 of BCC road (SH) in lieu of existing L.C.No.363 at Railway Km.494/4 of Madurai - Dindigul section near Sellur.(Court Case)(Charged)(64 Lands)
180000/2898874.
Madurai Divison (Projects)
AS / TS / RAS:
28,98,87 28,98,87 ... 24,12 1
G.O. Ms. No. 109, Highways (HS1)Department dt. 16.09.2020.
3,123,75,99 1,711,64,83 366,00,30 168,27,50 419,52,545054 80 800 JTTOTAL -
244
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
PB Tamil Nadu Road Sector Project
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PB
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 5 Project Director, Tamil Nadu Road Sector Project
16 Major Works 5054 80 800 PB 16 04( DPC )
Maintenance Component
49850791. AS / TS / RAS:
498,50,79 493,20,13 ... ... ...
G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.
Consultancy
7555042. AS / TS / RAS:
75,55,04 75,53,77 ... ... ...
G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.
Upgradation Component
170813003. AS / TS / RAS:
1,708,13,00 1,699,65,02 1 ... ...
G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010. G.O.(D) No.283 HW&MP Dept / Dt.13.12.17
Institutional Strengthing
4626774. AS / TS / RAS:
44,26,77 44,08,48 ... ... ...
G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.
Others ( R & R works and Misc.items)
6049285. AS / TS / RAS:
60,49,28 60,20,93 ... ... ...
G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.
64 Lands 5054 80 800 PB 64 03( DPC )
Lands
5508121. AS / TS / RAS:
55,08,12 53,56,22 1 ... ...
G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010. G.O.(D) No.168 / HW&MP Dep. Dt.20.07.17 G.O.(D) No.280 / HW&MP Dep. Dt.08.12.17
Lands (Charged)
02. AS / TS / RAS:
... ... 1 ... ...
2,442,03,00 2,426,24,55 3 ... ...5054 80 800 PBTOTAL -
245
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
PC Tamil Nadu Road Sector Project Phase - II
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 5 Project Director, Tamil Nadu Road Sector Project
16 Major Works 5054 80 800 PC 16 02( DPC )
Upgrading Arcot-Villupuram Road (SH 4) Km 29/800 to Km 110/200 and Km 113/200 to Km 114/200 and Km 113/200 to Km 114/600 (EPC 02)
49809201. AS / TS / RAS:
498,09,20 341,07,48 3,55,00 2,84,67 3,25,00
G.O.(D).No.117/HW&MP(HN.2)/ dated:29.05.2015
Strengthening and Widning (Four Lane) of Tirunelveli-Sengottai-Kollam Road of SH 39 from KM 27+700 to KM 50+600 PPP 03 Converted to EPC Mode Vide G.O(MS)No:159, H&MP, EAP-I(1) Department, dated:11.12.2020.
002. AS / TS / RAS:
... ... ... ... ...
G.O(D)No:117, H&MP, (HN.2) Department, dated:29.05.2015.
Strengthening and Widning (Four Lane) of Tirunelveli-Sengottai-Kollam Road of SH 39 from KM 27+700 to KM 50+600(Package II) (PPP 03 Converted) (EPC 15)
20025703. AS / TS / RAS:
200,25,70 1,06,99 66,56,40 5,36,40 79,00,00
G.O(MS)No:159, H&MP, EAP-I(1) Department, dated:11.12.2020.
Four Laning of Chithode -Erode section of SH 15 from KM-153/500 to KM-161/625 (EPC 13)
10008004. AS / TS / RAS:
100,08,00 ... ... ... 25,00,00
G.O(MS)No:105, H&MP, EAP-I(2) Department, dated:13.08.2020.G.O(MS).No:159, H&MP, EAP-I(I) Department, dated:11.12.2020.
Four Laning of Gobi-Erode Section of SH 15 from KM 123/000 to KM 153/600 (PPP 01 Converted) (EPC 16)
20982305. AS / TS / RAS:
209,82,30 30,66,92 148,03,60 2,09,28 65,00,00
G.O(MS)No:159, H&MP, EAP-I(1) Department, dated:11.12.2020.
Maintenance of Output and Performance Based Road Contract (642kms)
23900006. AS / TS / RAS:
239,00,00 200,80,06 12,66,58 25,38,75 1
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Upgrading Kanchipuram Vandavasi Road (SH116) Km 14/500 Km 36/900 (22.40 Km) & Upgrading Sadras - Chengalpattu - Kanchipuram - Arakkonam-Thiruthani Road (SH 58) Km 0/000 to Km 26/800 (26.143) (EPC 01)
25420607. AS / TS / RAS:
254,20,60 222,93,47 2,55,00 8,47,59 2,90,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
246
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
PC Tamil Nadu Road Sector Project Phase - II
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 5 Project Director, Tamil Nadu Road Sector Project
16 Major Works 5054 80 800 PC 16 02( DPC )
Upgrading Malliyakari-Rasipuram-Thiruchengode-Erode Road (SH 79) Km 0/000 to Km 30/600 and Km 51/400 to Km 71/300 (50.50 Km) (EPC 06)
29509708. AS / TS / RAS:
295,09,70 247,88,11 2,18,05 5,60,60 2,52,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Four lanning and Strengthening of Mettupalayam-Sathy-Gobi-Erode Road (SH 15) Km 123/000 to Km 153/400 (30.40 Km) (PPP 01) converted as EPC mode
009. AS / TS / RAS:
... ... ... ... ...
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015. G.O(MS).No:159, H&MP, EAP-I(I) Department, dated:11.12.2020.
Upgrading Rajapalayam-Sankarankoil-Tiruneveli Road (SH 41) Km 2/000 to Km 28/000 and Km 33/800 to Km 82/800 (75.20 Km) (EPC 10)
417994010. AS / TS / RAS:
417,99,40 349,32,57 1,66,60 2,22,13 3,35,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Four Laning of Omalur-Mecheri Section of SH 222 from KM:001-150 to KM:014-300 (EPC 11)
137175011. AS / TS / RAS:
137,17,50 ... ... ... 35,00,00
G.O(MS)No:105, H&MP, EAP-I(2) Department, dated:13.08.2020.G.O(MS).No:159, H&MP, EAP-I(I) Department, dated:11.12.2020.
Strengthening and widening of Thirunelveli-Sengottai-Kollam Road (SH 39) Km 5/000 to Km 50/600 (45.60 Km) (Package I)(PPP 03). Converted to (EPC 14)
118708012. AS / TS / RAS:
118,70,80 ... ... ... 50,28,40
G.O(MS).No:159, H&MP, EAP-I(I) Department, dated:11.12.2020.
Road Safety
120000013. AS / TS / RAS:
120,00,00 13,49,83 51,94,27 31,89,15 64,69,53
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Institutional Capacity Enhancement
66000014. AS / TS / RAS:
66,00,00 38,21,44 29,48,58 13,16,23 14,54,17
247
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
PC Tamil Nadu Road Sector Project Phase - II
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 5 Project Director, Tamil Nadu Road Sector Project
16 Major Works 5054 80 800 PC 16 02( DPC )
Upgrading Nanguneri Bharathavaram - Ovari Road (SH 89) upto ECR Junction Km 0/000 to Km 35/200 (35.20 Km) (EPC 08)
180706015. AS / TS / RAS:
180,70,60 164,11,32 1,21,20 1,20,00 1,20,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Upgrading Paruvakudi-Kovilpatti-Ettayapuram-Vilathikulam-Vembar Road (SH 44) Km 22/500 to Km 38/750 and Km 41/300 to Km 56/700 (EPC 09)
196501016. AS / TS / RAS:
196,50,10 169,07,06 1,55,00 3,47,95 1,52,97
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Upgrading Viruthachalam-Parankipettai Road (SH 70) Km 0/000 to Km 35/800 (35.80 Km) (EPC 04)
207628017. AS / TS / RAS:
207,62,80 54,20,50 30,00,00 60,13,06 69,99,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Four lanning and Strengthening of Ottanchathiram-Tharapuram-Thiruppur Road (SH 37) Km 37/400 to Km 126/200 (88.80 Km) (PPP 02)
642000018. AS / TS / RAS:
642,00,00 366,00,24 234,00,00 88,04,00 178,51,70
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Strengthening and Widening of Malliyakarai-Attur road of SH 30 from KM: 081/125 to KM: 091/200 (EPC 12)
91017019. AS / TS / RAS:
91,01,70 ... ... ... 25,00,00
G.O(MS)No:105, H&MP, EAP-I(2) Department, dated:13.08.2020.G.O(MS).No:159, H&MP, EAP-I(I) Department, dated:11.12.2020.
Upgrading Mohanur-Namakkal-Senthamangalam-Rasipuram Road (SH 95) Km 0/000 to 13/100 (13.10 Km) (EPC 07)
80051020. AS / TS / RAS:
80,05,10 76,97,76 63,30 1,02,34 1,05,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Contingencies
6950021. AS / TS / RAS:
6,95,00 89,16 13,00 13,00 25,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
248
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
PC Tamil Nadu Road Sector Project Phase - II
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 5 Project Director, Tamil Nadu Road Sector Project
16 Major Works 5054 80 800 PC 16 02( DPC )
Consultancy Services
132710022. AS / TS / RAS:
132,71,00 67,08,47 6,05,03 8,79,09 4,58,29
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Upgrading Omalur-Sankari-Thiruchengode-Paramathi Road (SH 86) Km 54/800 to Km 81/000 (26.20 Km) (EPC 05)
146390023. AS / TS / RAS:
146,39,00 105,74,34 1,09,20 2,75,70 1,39,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
Upgrading Cuddalore-Chithoor Road (SH 4) Km 41/700 to Km 44/000 and Km 45/000 to Km 66+190 and Construction of New Link Road between SH9 and SH 137 ( 28.45 Km) (EPC 03)
137615024. AS / TS / RAS:
137,61,50 110,30,55 75,38 7,74,13 95,22
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
64 Lands 5054 80 800 PC 64 01( DPC )
Lands
69300001. AS / TS / RAS:
693,00,00 186,42,98 20,00,00 274,41,84 33,00,00
G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.
5,171,00,00 2,746,29,25 614,06,19 544,75,91 663,00,295054 80 800 PCTOTAL -
249
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
4059 CAPITAL OUTLAY ON PUBLIC WORKS
01 Office Buildings
051 Construction
LD Creation of Infrastructure Facilities to the BuIldings
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 LD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 6 Chief Engineer (Quality Assurance and Research)
416 4059 01 051 LD 416 06( DPC )
CAPITAL OUTLAY ON PUBLIC WORKS -OFFICE BUILDING -CONSTRUCTION CREATION OF INFRASTRUCTURE FACILITIES TO THE BUILDINGS MAJOR WORKS
39571. AS / TS / RAS:
39,57 ... ... 39,57 ...
G.O.(2D).No 45 Highways and Minor ports (HR1) Department dated 28.11.2020
39,57 ... ... 39,57 ...4059 01 051 LDTOTAL -
250
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JI Improvements to Rural Roads with loan assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JI 16 01( DPC )
Construction of bridge across Adyar river between Tharapakkam Anakaputhur (Panchayat Union Road)
1227261. AS / TS / RAS:
12,27,26 4,58,29 3,83,90 2,23,34 1
G.O.Ms.No. 6, Highways (HW1)Dept., DT.4.1.2008,G.O.Ms.No. 57 / HW&MP (HP2) Dept, dated 25.04.2018
64 Lands 5054 04 337 JI 64 00( DPC )
Construction of bridge across Adyar river between Tharapakkam Anakaputhur (Panchayat Union Road)
01. AS / TS / RAS:
... ... 1 3,75,00 1
G.O.Ms.No. 6, Highways (HW1)Dept., DT.4.1.2008,G.O.Ms.No. 57 / HW&MP (HP2) Dept, dated 25.04.2018
12,27,26 4,58,29 3,83,91 5,98,34 25054 04 337 JITOTAL -
251
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JJ Improvement to Bus Routes with loan assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JJ 16 09( DPC )
01. AS / TS / RAS:
... ... ... ... ...
64 Lands 5054 04 337 JJ 64 08( DPC )
01. AS / TS / RAS:
... ... ... ... ...
... ... ... ... ...5054 04 337 JJTOTAL -
252
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JK Improvement to District and other Roads with loan assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JK
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JK 16 07( DPC )
01. AS / TS / RAS:
... ... ... ... ...
64 Lands 5054 04 337 JK 64 06( DPC )
01. AS / TS / RAS:
... ... ... ... ...
02. AS / TS / RAS:
... ... ... ... ...
... ... ... ... ...5054 04 337 JKTOTAL -
253
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JX Construction / Reconstruction of bridges and improvement of roads with loan assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JX
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JX 16 01( DPC )
01. AS / TS / RAS:
... ... ... ... ...
... ... ... ... ...5054 04 337 JXTOTAL -
254
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High Level bridge at km 5/10 of the road connecting at Km 6/8 of Uthiramerur -Kammalampoondi -Acharapakkam road and at Km 11/6 of Vedanthangal road
435001. AS / TS / RAS:
4,44,00 10,03 ... ... 1,09,01
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of bridge at Km.0/10 of Thuvarangkurichi-Adaikkampatti Road across Uppar River
216002. AS / TS / RAS:
2,37,00 12,05 ... ... 1,24,95
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High level bridge at km.16/4 of Thisayanvilai - Udangudi road.
600003. AS / TS / RAS:
6,00,00 3,74,51 ... ... 1,24,74
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
ReConstruction of bridge at km 0/8-10 of Kolakanthanam - Siruganpur Road
184934. AS / TS / RAS:
1,84,93 ... ... ... 1,21,74
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at Km.2/6 of Pudalathy-Marady-Kottapalayam road across Varattar river
137005. AS / TS / RAS:
2,34,00 4,48 ... ... 1,21,39
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Reconstruction of High Level bridge at km 0/4 of Thandanur diversion road in lieu of existing piped causeway
182766. AS / TS / RAS:
1,82,76 ... ... ... 1,20,31
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High level Bridge at km 2/6 of Sevoor - Vethajipuram road (via) Mullandram
177827. AS / TS / RAS:
1,77,82 ... ... ... 1,17,06
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
255
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of Bridge at Km 5/8 of Chandrasekarapuram - Harithuvaramangalam Road.
165008. AS / TS / RAS:
1,65,00 3,83 ... ... 1,15,17
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Construction of High level Bridge at Km 37/2 of Malliyakarai- Rasipuram- Tiruchengode- Erode Road in lieu of existing Piped causeway
148309. AS / TS / RAS:
1,63,00 ... ... ... 2,42
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
ReConstruction of bridge at km 3/6 of Ponparappi - Thittakudi Road
1680610. AS / TS / RAS:
1,68,06 ... ... ... 1,10,64
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of High level Bridge at km 2/10 of Mattathari to Irumbedu road
1975811. AS / TS / RAS:
1,97,58 ... ... ... 1,30,07
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of bridge at km 2/0 of K.Pudur - Thiyagarajapuram road
1481812. AS / TS / RAS:
1,48,18 ... ... ... 1,07,55
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of Bridge at km 41/8 of Vadamadurai - Oddanchatram road.
2564613. AS / TS / RAS:
2,56,46 ... ... ... 1,02,53
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High level bridge at Km 0/2 of Paravalur - Thottikuppam road across Manimuktha river. 12 Span 19.60Mt
15000014. AS / TS / RAS:
16,50,00 8,73,16 ... ... 1,01,84
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
256
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of high level bride at Km 1/4 of Narasingapuram - Vadavampallam road across Malattar river.
5000015. AS / TS / RAS:
5,00,00 9,28 ... ... 90,72
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level Bridge branching at km 12/4 of Kanagammachatram - Thakkolam road
3250016. AS / TS / RAS:
3,57,50 1,15,52 ... ... 29
G.O.Ms.28,HW&MP(HW1)Dept dt.11.2.16
Reconstruction of Minor Bridge at km 3/2 of Melur - Samuthirapatti - Kottaiyur - Aravakurichi road
1260117. AS / TS / RAS:
1,26,01 43 ... ... 87,01
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of bridge at km 1/8 of Sempanserpakkam - Thiruppampuram road via Serugudi village across koraiyar river
1728818. AS / TS / RAS:
1,72,88 ... ... ... 1,13,81
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High Level bridge at km 0/6 of Kaliyanur - Rasakovil road in lieu of existing vented causeaway
2252419. AS / TS / RAS:
2,25,24 ... ... ... 1,48,28
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of Minor Bridge at km 9/2 of Avalsoorapatti - Sennampatti road.
2223520. AS / TS / RAS:
2,22,35 72 ... ... 1,66,53
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of High Level bridge at km 0/6 of Veppadai main road to Makkiripalayam Road in lieu of existing piped causeway
2529021. AS / TS / RAS:
2,52,90 ... ... ... 1,66,49
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
257
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Constructio of Minor Bridge at Km.3/2 of Maharajakadai - Naralapalli Road in lieu of existing damaged piped causeway
2528822. AS / TS / RAS:
2,52,88 ... ... ... 1,66,48
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
ReConstruction of bridge at km 4/6 of Eraiyur - Kalpadi - Pannangur Road
2522323. AS / TS / RAS:
2,52,23 ... ... ... 1,66,05
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 4/8 of Senthamangalam - Periyakudi road across Arichandra river
2469724. AS / TS / RAS:
2,46,97 ... ... ... 1,62,59
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High level Bridge at km 1/2 of Kannamangalam - Arni road to sevoor - Vethajipuram road (via) Adaiyapulam
2371025. AS / TS / RAS:
2,37,10 ... ... ... 1,56,09
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of High level bridge across Kanthaparichaan drain connecting Alangadu - Ayirakanni road at km 0/10 and Alangadu - Kottagam road at km 0/4
2370926. AS / TS / RAS:
2,37,09 ... ... ... 1,56,08
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction 0f Bridge at km 20/6 of Natham - Pillayarnatham road.
2910027. AS / TS / RAS:
2,91,00 ... ... ... 1,25,18
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
ReConstruction of Minor bridge at km 13/6 of Krishnapuram - Thondamandurai - Annamangalam Road
2270128. AS / TS / RAS:
2,27,01 ... ... ... 1,49,44
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
258
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
ReConstruction of bridge across Kattaru at km 3/10 of Thekkur Village Road
1764829. AS / TS / RAS:
1,76,48 ... ... ... 1,26,18
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 5/6 of Mannargudi - Orathanadu - Thiruvonam road
1000030. AS / TS / RAS:
1,10,00 1,00,08 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of High level bridge at Km 1/8 of Veppanthattai - Neiduppai GST Road
2326031. AS / TS / RAS:
2,32,60 ... ... ... 1,37,86
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of Bridge at Km 0/6 of Thiruneelagudi - Kadalangudi Road
1980032. AS / TS / RAS:
1,99,50 1,38,37 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Constructio of Minor Bridge at Km.12/10 of Kathikuppam RS - Bagimanur Road in lieu of existing piped causeway
2016133. AS / TS / RAS:
2,01,61 ... ... ... 1,32,99
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
ReConstructio of High level Bridge at Km.0/6 of Ekkur Road in lieu of existing piped causeway
2018734. AS / TS / RAS:
2,01,87 ... ... ... 1,32,89
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Constructio of Minor Bridge at Km.16/6 of Pochampalli - Thogarapalli - Kappalvadi Road in lieu of existing low level piped causeway
2018435. AS / TS / RAS:
2,01,84 ... ... ... 1,32,87
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
259
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of bridge at km 2/2 of Kollapuram - Kadagam road
1200036. AS / TS / RAS:
1,20,00 5,38 ... ... 77,84
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
ReConstruction of bridge at km 0/10 of Vedasandur - Koombur Road (Via) Nagakonnanur
2193537. AS / TS / RAS:
2,19,35 ... ... ... 1,54,80
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Construction of Minor Bridge atKm 6/4 of Thummanatty -T.Manihatty road. (ODR) Single span of 8.60m.
1200038. AS / TS / RAS:
1,43,00 3,66 ... ... 4,68
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Construction of Bridge at Km 2/8 of Kakkadasam - Thogarai Road in lieu of existing piped causeway-Thogarai, Kakkadasam
2355439. AS / TS / RAS:
2,35,54 ... ... ... 83,15
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstrution of high level bridge at Km 0/8 of Meliruppu - Keeliruppu road.
5000040. AS / TS / RAS:
5,50,00 23,33 ... ... 26,67
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of bridge at Km. 0/4 of Perumpalaipatti Road branching from 17/0 of Kottanathampatti – Kodukkampatti Road.
2200041. AS / TS / RAS:
2,42,00 36,59 ... ... 21,54
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018
Construction of High level bridge at km 0/10 of Akkaraipatti - Thirumanimutharu road across Thirumanimutharu.
4980042. AS / TS / RAS:
5,15,00 96,34 ... ... 14,38
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
260
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of Bridge at km 7/2 of Walajabad-Thirupulivanam Road
1500043. AS / TS / RAS:
3,16,00 1,12,03 ... ... 11,88
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of High level bridge at Km 1/4 of Chettithangal - ayangudi road. (4 Span 7.40 mt each)
3200044. AS / TS / RAS:
3,52,00 12,80 ... ... 9,20
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Minor Bridge at Km 1/10 of Aravenu - Halakkarai road. (ODR) Single span of 8.60m.
1300045. AS / TS / RAS:
1,43,00 38,84 ... ... 8,59
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level Bridge at Km 1/10 of Myladumparai – Thangammalpuram Road(Via) Moolakadai, Vaikalparai.
5000046. AS / TS / RAS:
5,50,00 1,33,48 ... ... 31,00
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge at km 0/6 of GST road to Palayanur Harijan colony road
1300047. AS / TS / RAS:
2,09,00 90,32 ... ... 4,68
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge at km 0/6 of Thenkovanoor - Vakkottai Road across Sithar river
543348. AS / TS / RAS:
54,33 ... ... ... 35,76
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 0/10 of Kanagamma chathirm-Thakkolam road across Kosasthalaiyar river
11000049. AS / TS / RAS:
12,07,00 5,58,24 ... ... 50
G.O.(Ms)No. 20,HW&MP(HW1) Dept dt. 3.4.2017
261
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High level Bridge at km 7/6 of Tiruchengode-Kokkarayan pettai Road in lieu of existing Pipe culvert
2744650. AS / TS / RAS:
3,01,50 ... ... ... 65
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of High level Bridge at Km 0/10 of Mettala -Mullukuruchi Periyagombai road .
1384351. AS / TS / RAS:
1,52,00 ... ... ... 1,23
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of minor bridge at km 0/2 of Vattanam road
709752. AS / TS / RAS:
78,00 ... ... ... 4,49
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of Bridge at Km.3/2 of Palani - Kolumam Road to Shanmugamparai (Via) Chinna Gandhipuram
3000053. AS / TS / RAS:
3,30,00 36,78 ... ... 1,74,61
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km. 0/4 of Reddipalayam village connecting Korukkai panchayat and Sheshambadi panchyat.
1980054. AS / TS / RAS:
1,99,95 6,53 ... ... 1,58
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High level bridge at km 1/2 off Agaram road branching at km 19/10 of Rasipuram-Tiruchengode road in lieu of existing piped causeway.
3220055. AS / TS / RAS:
3,54,00 6,88 ... ... 2,93,15
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
Construction of Minor bridge in lieu of existing piped causeway at km 16/6 of Sathy -Ukkaram- Puliyampatty road
1980956. AS / TS / RAS:
2,17,87 ... ... ... 4,88
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
262
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High level bridge at Km 4/6 of Navalai Peramandapatti road
10600057. AS / TS / RAS:
11,60,00 20,49 ... ... 53,22
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High level bridge at Km 0/6 of Perur-Vedapatty road across Noyyal river (ODR) 4 Spans of 8.60m each.
3500058. AS / TS / RAS:
1,99,50 9,17 ... ... 2,08
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High level bridge at Km 0/4 of Peyadikkottai to Join Thiruvadanai (via) Sirugampur- Vellaipuram road.
5200059. AS / TS / RAS:
5,70,00 5,60,98 ... ... 76,26
G.O.(Ms)No. 22,HW&MP(HW1) Dept dt. 20.02.2015
Reconstruction of Narrow Bridge at Km 8/10 of Denkanikottai - Anchetty - Natrampalayam Road-Odai-Dhurgamathukottai
2996060. AS / TS / RAS:
3,29,29 ... ... ... 74,94
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of bridge at km 12/2 of Pongalur - Mettukadai Road (via) Kengamanaickenpalayam in lieu of existing cause way.
1586861. AS / TS / RAS:
1,74,50 ... ... ... 73,04
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
ReConstruction of bridge at km 0/6 of Elumur - Murukankudi Road
1092462. AS / TS / RAS:
1,09,24 ... ... ... 71,91
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 5/4 of Chinnadharapuram - Pallapatty road in lieu of existing cause way.
3313663. AS / TS / RAS:
3,64,40 ... ... ... 63,82
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
263
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of Minor Bridge at Km 2/6 of Watrap - Maharajapuram Road to Taniparai Road.
1750064. AS / TS / RAS:
1,80,00 1,36 ... ... 63,64
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Construction of High Level Bridge at km 9/6 of Perumbadi - Sempalli - Jittapalli Road
7000065. AS / TS / RAS:
7,20,00 4,25,45 ... ... 30,00
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of minor bridge @Km 1/4 of Mathur to Mulaikulam Road
2313066. AS / TS / RAS:
2,31,30 3,18 ... ... 57,21
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
ReConstruction of bridge at km 5/10 of Valaiyur - Perahambi road across Kattaru
1260267. AS / TS / RAS:
1,26,02 ... ... ... 82,96
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of High Level bridge at km 14/4 of Uthiramerur -Kammalam poondi -Acharapakkam road
6040068. AS / TS / RAS:
6,64,00 40,40 ... ... 50,00
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Minor bridge in lieu of existing Piped Causeway at km 2/10 of Nagadevampalayam road ( 3 x 9.42 m )
2000069. AS / TS / RAS:
2,00,00 1,76,65 ... ... 48,76
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
ReConstruction of bridge at km 9/8 of Ayyalur - Kudikadu-Sathanur Road
672370. AS / TS / RAS:
67,23 ... ... ... 44,26
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
264
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of Bridge at Km.29/10 of Vaiyampatty - Karur Road (Via) Mylampatty - Uppidamangalam
1489771. AS / TS / RAS:
1,63,86 ... ... ... 42,00
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of Bridge at Km.23/8 of Manapparai – Gujiliamparai Road
1486972. AS / TS / RAS:
1,63,55 ... ... ... 41,77
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of minor bridge at km 0/2 of Paramakudi - Mudukulathur road to Pulithikulam road (via) Thenpoduvakudi
592773. AS / TS / RAS:
59,27 ... ... ... 39,01
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of high level Bridge at km. 5/6 of Kappalur - Embal road
2700074. AS / TS / RAS:
2,87,00 2,13,46 ... ... 38,89
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge at km 0/2 of Kadagampadi - Perumal theru road connecting Vadugakudi village across koothanur vaikkal
889175. AS / TS / RAS:
88,91 ... ... ... 58,53
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Constructio of High Level Bridge at Km.1/6 of Salem-Ulundurpet Road Chinnamasamudram AD Colony Road in lieu of existing causeway
6133676. AS / TS / RAS:
6,13,36 ... ... ... 4,03,79
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 4/8 of Solagampatty - Maraneri road
5433677. AS / TS / RAS:
5,43,36 ... ... ... 3,57,71
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
265
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High level Bridge connecting the villages Pasavanayankuppam Karungali across Agaram river
7409578. AS / TS / RAS:
7,40,95 ... ... ... 4,87,79
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
ReConstruction of bridge at km 2/10 of Arasarkulam Road across Maruthankudi river
7143179. AS / TS / RAS:
7,14,31 ... ... ... 4,80,25
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Construction of High level bridge at Km.0/2-0/4 of Edayathankudi - Periyathirukonam road.
12000080. AS / TS / RAS:
13,00,00 23,22 ... ... 4,76,78
G.O.Ms.No. 208 / HW&MP (HP2) Dept, dt. 12.12.18
Construction of High Level bridge at km 0/6 of Anjur - Azhagunachiyammankovil panchayat road
7113281. AS / TS / RAS:
7,11,32 ... ... ... 4,68,29
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High level bridge at km 8 /4 of Melkalavai - Bonthai Road (via) Naganur, Aviyur across Thondi river
6722182. AS / TS / RAS:
6,72,21 ... ... ... 4,42,54
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of High Level bridge at km 5/4 of Emapalli - Kailasampalayam road to pappampalayam road (via) Appanaickampalayam in lieu of existing bed level causeway
6718083. AS / TS / RAS:
6,71,80 ... ... ... 4,42,27
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 2/2 of Manakarai - Pirancheri road
7923284. AS / TS / RAS:
7,92,32 ... ... ... 5,21,61
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
266
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstrution of high level bridge at Km 2/4 of Edaiyar - Thirumoolasthanam road.
4500085. AS / TS / RAS:
5,00,00 5,59 ... ... 4,14,41
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level Bridge at Km 0/10 of Chinthamanipudur-Pappampatty Road (via) Nadu palayam. (ODR) 11 Spans of 16.60m each.
8000086. AS / TS / RAS:
8,00,00 5,06 ... ... 5,49,94
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Construction of High level Bridge at km 1/10 - 2/2 across Goundar river of Alampatti - Sedapatti Road
6132987. AS / TS / RAS:
6,13,29 ... ... ... 4,03,48
G.O.Ms.No. 145 / HW&MP (EAP.II(2)) Dept, dt. 18.11.2020.
Reconstruction of Bridge at Km. 0/2 of Thiruvisainallur - Thirubuvanam Road.
2600088. AS / TS / RAS:
4,05,00 2,50 ... ... 3,97,17
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
Construction of High Level bridge at km 0/4 & 0/6 of Kanuvai - Pannimadai Road
5884189. AS / TS / RAS:
5,88,41 ... ... ... 3,87,37
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Construction of Bridge at Km. 18/6 of Vathalakundu - Peraiyur - Kariyaptiit Road
2500090. AS / TS / RAS:
4,42,00 2,68 ... ... 3,86,83
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
Reconstruction of bridge at km 0/8 of TC-Metuppaalayam road (R331)
5779591. AS / TS / RAS:
5,77,95 ... ... ... 3,80,48
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
267
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of bridge at km 8/4 of Mannachanallur - Edumalai - Elanthalaipatti road across upper river
5581992. AS / TS / RAS:
5,58,19 ... ... ... 3,67,47
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High level Bridge at km 7/6 of Mallasamu daram-Vaiyappamalai-Road in lieu of existing Vented causeway.
3491493. AS / TS / RAS:
3,84,00 ... ... ... 2,88,74
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of bridge at km 0/2 of Veppankudi - Ponvizhaithanpatty road
6421794. AS / TS / RAS:
6,42,17 ... ... ... 4,22,76
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at Km 53/10 of Kumbakonam - Mannargudi – Adirampattinam Road. (SH 66)
8105395. AS / TS / RAS:
8,10,53 ... ... ... 7,56,56
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High Level bridge at km 0/4 of Annayampatty Pudur - Kuravar colony road across suvetha river
19758996. AS / TS / RAS:
19,75,89 ... ... ... 13,00,80
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of additional two lane High level bridge at Km.33/4 of Thirumazhsai-Uthukkottai road.(Left side)
13200097. AS / TS / RAS:
15,28,80 ... ... ... 12,46,83
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High level bridge at across vaigai river at km 22/4 of NH 49 Madurai-Dhanushkodi road to meet pedhanenthal
17782798. AS / TS / RAS:
17,78,27 ... ... ... 11,70,70
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
268
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of Bridge at KM 4/6 of Melanur -Meyyur road across Kosasthalaiyar.
13600099. AS / TS / RAS:
14,96,00 9,75 ... ... 10,59,33
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Constr. of High Level Bridge across Vaigai river in the road branching from Madurai - Dhanushkodi road (NH-49) to meet Ramnad - Melur road (SH-34) (via) Pottithatti, Mandivalasai, Kalladiyendai, Vellam, Pagalvendri
155462100. AS / TS / RAS:
15,54,62 ... ... ... 10,23,46
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Construction of High level bridge at km 0/4 of Sirupalaiyur - Manikollai road across Paravanar
148185101. AS / TS / RAS:
14,81,85 ... ... ... 9,75,56
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High Level Bridge at Km 9/2 of Chinnamapet - Thakkolam road across Kallar River
130000102. AS / TS / RAS:
13,50,00 11,05 ... ... 9,65,90
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
ReConstruction of Bridge across Palavar at km 11/6 of Mappadugai - Kadalangudi Road
74567103. AS / TS / RAS:
7,45,67 ... ... ... 4,90,90
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Construction of High Level bridge across Vennar river connecting Haridwaramangalam and Ukkadai villages
118554104. AS / TS / RAS:
11,85,54 ... ... ... 7,80,48
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of Major bridge at Km 114/6 of Villpuram - Puducherry - Nagapattinam road.
39618105. AS / TS / RAS:
3,96,18 4,09 ... ... 3,42,09
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
269
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High level bridge at km 153/4-6 of Thanjavur-Sayalkudi road
103438106. AS / TS / RAS:
10,34,38 ... ... ... 6,65,98
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High level bridge at km 1/6-8 of Veppankulam-Vishalayankottai road
98793107. AS / TS / RAS:
9,87,93 ... ... ... 6,50,89
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 4/8 of road branching from km 31/6 of Vikkiravandi-Kumbakonam-Thanjavur road to CN Palayam (via) Sathipattu across Sakliyan odai
98788108. AS / TS / RAS:
9,87,88 ... ... ... 6,50,36
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of Bridge at Km. 1/10 of Ayyampettai-Ganapathiagraharam road
108000109. AS / TS / RAS:
11,88,00 2,31,13 ... ... 6,44,84
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High Level bridge at km 3/0 of Nabirampatti - Vilanatham road across Pambaru
94842110. AS / TS / RAS:
9,48,42 ... ... ... 6,24,38
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of High level bridge across Noyyal river at km 0/2 of Maruthurai - K.G. Valasu road
83975111. AS / TS / RAS:
8,39,75 ... ... ... 5,52,84
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of High Level bridge across Vettar river connecting Narasingamangalam and Mathur villages
83975112. AS / TS / RAS:
8,39,75 ... ... ... 5,52,84
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
270
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High level Bridge at km 33/4 of Thirumazhisai-Uthukkottai road
110000113. AS / TS / RAS:
12,10,00 14,39 ... ... 9,60,61
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of Bridge at Km. 60/2 of Madukkur - Pattukkottai road (MD 226)
21252114. AS / TS / RAS:
2,33,70 ... ... ... 2,07,52
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High Level Bridge at km 0/8 of Sampathuvarayanpettai to Eluppai Thandalam road across kallar river
55322115. AS / TS / RAS:
5,53,22 ... ... ... 3,64,20
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of high level bridge at Km 0/2 of K. Adoor road.
30000116. AS / TS / RAS:
3,30,00 9,29 ... ... 2,40,71
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level bridge at km 1/2 OF Katheri - Vaikundampalayam Road
35564117. AS / TS / RAS:
3,55,64 ... ... ... 2,34,13
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 12/8 of Ayyarmalai - Kumaramangalam road via valayapatty
34576118. AS / TS / RAS:
3,45,76 ... ... ... 2,27,62
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High level Bridge at km 1/4 of Vadakkumedu Road
34576119. AS / TS / RAS:
3,45,76 ... ... ... 2,27,62
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
271
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of Bridge at Km.8/10 of Pallapatti - Aravakurichy (via) Esanatham - Gujiliyamparai Road
75000120. AS / TS / RAS:
8,25,00 ... ... ... 2,25,00
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of Bridge at km 1/4 of Muthur - Mulanur Road to Udayam road in lieu of existing cause way
33613121. AS / TS / RAS:
3,36,13 ... ... ... 2,21,28
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reonstruction of Bridge at Km.14/6 of Mannargudi - Sethubavachatram road
24167122. AS / TS / RAS:
2,65,00 ... ... ... 2,41,71
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of Bridge at Km 1/8 of Keeanilaikottai - Usilampatti road.
33200123. AS / TS / RAS:
3,32,00 6,31 ... ... 2,11,46
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Minor Bridge at km 3/6 of Arcot - Arungundram road
37047124. AS / TS / RAS:
3,70,47 ... ... ... 2,43,89
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of bridge at km 2/6 of Pethulupatti - Thiyagarajapuram road
29637125. AS / TS / RAS:
2,96,37 ... ... ... 1,97,90
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of Bridge at km 6/2 of Moolakarai - Piranthiyakarai - Kariyapattinam road
24494126. AS / TS / RAS:
1,99,90 ... ... ... 1,96,03
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
272
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High level bridge at km 1/6 of Uppar - Karaithidal road across Koraiyar drain
29637127. AS / TS / RAS:
2,96,37 ... ... ... 1,95,11
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of minor bridge at km 1/10 of paiyur - Aalathurai road
29636128. AS / TS / RAS:
2,96,36 ... ... ... 1,95,10
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of Bridge at Km 31/4 of Sivagiri- Nathakadaiyur - Muthur Road in lieu of existing cause way
31828129. AS / TS / RAS:
3,45,00 ... ... ... 1,90,20
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of high level bridge at Km 9/4 of Ganapathy - Athipalayam road
29214130. AS / TS / RAS:
3,12,00 ... ... ... 1,87,00
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
ReConstruction of bridge at km 2/2-4 of Nergunam-Noothapur Road
27319131. AS / TS / RAS:
2,73,19 ... ... ... 1,79,85
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
ReConstruction of bridge at km 2/6 of Kallakudi - Palanganatham Road
33289132. AS / TS / RAS:
3,32,89 ... ... ... 2,19,15
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Construction of bridge at km 2/4 of Muniyappampalayam-Karatur road in lieu of existing damaged piped causeway
40000133. AS / TS / RAS:
4,40,00 9,00 ... ... 2,81,00
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
273
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High level bridge at km 1/6 to 1/ 8 of panapakkam - Perandavaram (via) Veeranamur road across Thondi river
50409134. AS / TS / RAS:
5,04,09 ... ... ... 3,41,86
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 0/4 of Agalanganallur - Muthurajapuram road across upper river
48407135. AS / TS / RAS:
4,84,07 ... ... ... 3,28,68
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of high level bridge in the road connecting km 3/8-10 of Ranjankudi-V-Kuluthur-Kaikalathur Road
44547136. AS / TS / RAS:
4,45,47 ... ... ... 2,93,27
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 3/2 of Edamanal - Nallur road
7500137. AS / TS / RAS:
82,00 57,34 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of High level bridge in lieu of existing bed level causeway at km 5/6 of Alangudi-Arimalam road to Nagarathinam Pallam (via) Pommanathapuram, N.Kothamangalam, Isugupatti road
44455138. AS / TS / RAS:
4,44,55 ... ... ... 2,92,66
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 45/2 of Mayiladuthurai - Thiruthuraipoonid road across Pandavaiyar river (SH 23)
35000139. AS / TS / RAS:
3,50,00 6,49 ... ... 2,88,06
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
Construction of high level bridge at Km 10/6 of Kuruchi - Kannamanaickenur road (via) Nachipalayam
39104140. AS / TS / RAS:
4,30,00 ... ... ... 2,84,01
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
274
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of high level bridge at Km 3/4 of K. Adoor road.
30000141. AS / TS / RAS:
3,30,00 9,29 ... ... 2,40,71
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Bridge at Km.25/6 of Kodukkur - kaduvetti road.
23000142. AS / TS / RAS:
4,00,00 1,84 ... ... 2,81,16
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
Reconstruction of High level Bridge at km 2/8 of Arcot Villupuram to Ondikudisai road
26673143. AS / TS / RAS:
2,66,73 ... ... ... 1,75,59
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of minor Bridge at km 11/4 of Kancheepuram - Thiruvathipuram road to join Pudupalayam
41492144. AS / TS / RAS:
4,14,92 ... ... ... 2,73,15
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of high level bridge at km 1/8 of Kundiyamallur – Poovalai road in lieu of existing causeway. (9 Spans 14.30 Mt each)
86180145. AS / TS / RAS:
9,47,00 7,02,69 ... ... 2,69,31
G.O.Ms.116,HW&MP(HW1)Dept dt.25.11.16
Construction of minor bridge at km 0/8 of Athikulam - Anakavoor road
39515146. AS / TS / RAS:
3,95,15 ... ... ... 2,60,14
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 0/8 of Agraparapudur - Somanur road
39516147. AS / TS / RAS:
3,95,16 ... ... ... 2,60,14
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
275
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of bridge across Cauvery river at km 0/10 of Vanagiri - Erampalayam road
27500148. AS / TS / RAS:
3,02,50 5,23 ... ... 2,58,77
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
ReConstruction of bridge at km 1/10 of Valaiyur - 94 Kariyamanickam road across Uppar river
38658149. AS / TS / RAS:
3,86,58 ... ... ... 2,54,50
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of High level Bridge at km 13/8 of Banavaram Sendhamangalam road to Manamadurai road km 1/4
38528150. AS / TS / RAS:
3,85,28 ... ... ... 2,53,64
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge across cauvery river at km 0/4 of Mappadugai - Kadalangudi road
40000151. AS / TS / RAS:
4,00,00 7,87 ... ... 2,82,38
G.O.Ms.No. 11 / HW&MP (HW1) Dept, dt. 01.02.18
Construction of Minor Bridge at Km 7/8 of Meenachipuram - A.Mukkulam Road.
9000152. AS / TS / RAS:
99,00 91,19 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High level bridge at Km 15/8 of Kamanaickenpalayam Negamam Chettipalayam Road (ODR)3 Spans of 5.60m each.
15000153. AS / TS / RAS:
1,60,00 1,36,68 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Culvert at km.6/6 of Vattakotai - Amsi road.
4500154. AS / TS / RAS:
49,50 24,16 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
276
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of Culvert km.0/6 of Kunchiruppuvilai - Mathapuram Road.
3500155. AS / TS / RAS:
38,50 26,60 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High level bridge at km.54/10 of Tirunelveli - shencottai - Kollam Road (SH-39)
29693156. AS / TS / RAS:
3,26,00 1,06 ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of high level Bridge at Km 9/4 of Thudiyalur Chinna thadagam road in lieu of damaged bed level cause way. (MDR) 2 Spans of 14.60m each
27500157. AS / TS / RAS:
3,00,00 2,79,42 ... ... 1
G.O.Ms.No. 20 / HW&MP (HW1 Dept, dt. 03.04.2017
Construction of bridge at km 16/6 of Vairamadai - Thoppampatty - Kuppam road (MD 728) in-lieu of existing narrow canal. (2x8.40m)
8000158. AS / TS / RAS:
88,00 88,08 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of Bridge at km 27/6 of Manaparai - Gujiliamparai road (MDR 628) (2 x 8.42m )
10000159. AS / TS / RAS:
1,09,00 1,09,50 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High level bridge at km.1/2 of Kothaiseri Road.
34000160. AS / TS / RAS:
1,99,50 2,93 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Reconstruction of High level Bridge at km 12/6 of Palaviduthi - Kadavur - Ayyalur road (MDR 648) ( 5 x 10.42 m )
20000161. AS / TS / RAS:
2,20,00 2,30,99 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
277
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High Level Bridge between Irumbulicherry in Thirukkalukundram Taluk and Sevur in Cheyyur Taluk across Palar River
130000162. AS / TS / RAS:
14,30,00 8,95,27 ... ... 1
G.O.Ms.22, HW&MP(HW.1)Dept.,dt 20.2.15
Construction of High level bridge at Km 10/10 of Alampatti - Sedapatti road (M-10)
40000163. AS / TS / RAS:
4,33,00 2,05,28 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Highlevel bridge in lieu of piped causeway at km 3/10 of kolanali R.S. Veerasangili Road ( 4 x 7.60 m )
16500164. AS / TS / RAS:
1,81,50 1,79,51 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of bridge at Km.2/6 of Thandalai-Thiruthalaiyur road
27400165. AS / TS / RAS:
2,91,00 10,01 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level Bridge at km 0/4 of Sellivalasu - Vennaikothur road.( 8 x 9.42 m - skew 15 deg.)
36000166. AS / TS / RAS:
3,96,00 2,86,52 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Minor bridge in lieu of existing narrow LBP canal arch bridge at km 8/2 of Arasur - Nambiyur market road
25000167. AS / TS / RAS:
2,50,00 ... ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of Bridge at km 34/10 of Erode - Dharapuram road (SH 83A) Single span of 8.60 m
10000168. AS / TS / RAS:
1,10,00 67,70 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
278
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High level Bridge at Km 2/4 of Kumarankundru - Vellikuppampalayam road (via) Sennampalayam. (ODR)5 spans of 9.42m each
26000169. AS / TS / RAS:
2,60,00 2,44,13 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Construction of High Level Bridge at Km 4/6 of Hanumantheertham Poyyapatti road
37000170. AS / TS / RAS:
3,70,00 1,35,64 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High level bridge at km 1/4 of Periyakottapalli - M.C. Palli road.
31500171. AS / TS / RAS:
3,26,00 3,06,08 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of High Level Bridge at km.9/8 of Rediyarpatti - Vijayanarayanam Road.
27000172. AS / TS / RAS:
1,98,00 1,43,09 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Minor Bridge at Km 4/8 of Rajapalayam - Ayyanarkovil Road to Shenbagathoppu Road.
20000173. AS / TS / RAS:
1,99,75 1,77,08 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Bridge at KM 1/2 of Udumalpet Senjeri Hills Road (MDR) 3 Spans of 10.16m each.
15000174. AS / TS / RAS:
1,65,00 1,65,92 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Bridge at Km 1/8 of Sirukarumbur - Vegamangalam
43350175. AS / TS / RAS:
4,33,50 3,72,54 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
279
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of bridge at Km 2/8 of Valarpuram to Krishnapuram road across Nandhi River
50000176. AS / TS / RAS:
5,23,00 4,24,91 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Construction of Bridge at km 5/2 of Puthenthal - Erwadi Road
19800177. AS / TS / RAS:
1,98,00 1,20,65 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High Level Bridge branching at Km 3/6 of Melpakkam - Kannampalayam Road and joining to Avadi (across Coovam river)
66000178. AS / TS / RAS:
6,60,00 4,25,76 ... ... 1
G.O.Ms.No. 201 / HW&MP (HW1) Dept, dt. 19.12.13
Reconstruction of High Level Bridge at km 3/4 of Karambai - Pottal Road
13000179. AS / TS / RAS:
1,43,00 1,11,41 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Minor bridge at km.1/6 of Perunchelvavilai road.
10000180. AS / TS / RAS:
1,09,00 99,82 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Box Culvert at km. 6/4 on Kottar - Dharmapuram road.
6000181. AS / TS / RAS:
50,00 34,58 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of high level bridge at Km 2/2 of the road from km 10/0 of Pollachi – Valparai road to join Km 11/4 of Anaimalai – Poolankinar road. (ODR) 3 Spans of 10.00m each
11000182. AS / TS / RAS:
1,10,00 1,04,59 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
280
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of High level Bridge at km.6/4 of Pudhur - Paralachi road.
15000183. AS / TS / RAS:
1,65,00 1,58,38 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High Level Bridge at km.0/4 of Kayathar - Kalugumalai road.
35000184. AS / TS / RAS:
3,85,00 3,59,78 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of minor bridge at km.0/8 of Meenakshipuram - Venkadachalapuram road.
15000185. AS / TS / RAS:
1,55,00 1,14,38 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of minor bridge at km.2/4 of Sivasylam Tharmapurammadam Road
9000186. AS / TS / RAS:
99,00 88,97 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of high level bridge at km.1/6 of Shenbagapuram - Meenakshipuram road.
40000187. AS / TS / RAS:
4,00,00 1,18,18 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Bridge at km.57/8 of Palayamkottai - Kurukkusalai - Kulathur - Vilathikulam - Nagalapuram- Pandalkudi - Aruppukottai road.
25795188. AS / TS / RAS:
2,82,50 4,15 ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of bridge at Km 0/6 of Nallur - Elangiyanur road.
110000189. AS / TS / RAS:
12,10,00 11,65,42 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1) Dept, dt. 19.12.2013
281
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High level Bridge acrss Arani river branching at Km 6/8 of Chennai-Pulicat road and connecting Puduvoyal-Pulicat road at Km 5/2
112000190. AS / TS / RAS:
12,30,00 10,19,22 ... ... 1
G.O.Ms.No. 9 / HW&MP (HW1) Dept, dt. 29.01.15
Reconstruction of High level Bridge at km.1/2 of Vasudevanallur - Poolangulam Road.
10000191. AS / TS / RAS:
1,10,00 1,03,19 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km. 4/6 of Neivasal -Arasapattu - Oosimathagu Road.
19700192. AS / TS / RAS:
1,99,95 4,69 ... ... 91,43
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Reconstruction of Bridge at km 8/4 of Palaviduthi - Kadavur - Ayyalur road (MDR 648)( 2 x 8.42 m - skew 60 deg.)
9000193. AS / TS / RAS:
98,90 99,68 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Minor Bridge at Km 1/2 of Sitheri road
17000194. AS / TS / RAS:
1,87,00 1,77,15 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of Minor Bridge at Km 12/4 of Bilparuthi Gurubarahalli road
22000195. AS / TS / RAS:
2,20,00 2,08,70 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of a Bridge at Km 2/10 of Mallasamuthiram Anumanthapuram road
15000196. AS / TS / RAS:
1,56,00 1,13,67 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
282
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of Bridge at Km 0/4 of Bommidi RS - Thoppaiyar dam road in lieu of existing piped causeway
24000197. AS / TS / RAS:
2,64,00 2,46,29 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Minor bridge in lieu of vented causeway at km 9/2 of Sathy-Ukkaram-Puliyampatti road( 3 x 10.42 m )
16000198. AS / TS / RAS:
1,65,00 1,10,13 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of bridge at km 2/6 of Dharapuram - Poolavadi Road (MD 884) ( 3 x 9.42 m - skew)
15000199. AS / TS / RAS:
1,65,00 1,45,02 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High Level Bridge at Km 0/10 of Amani Mallapuram-Chandarapuram road across Chinnar River
43500200. AS / TS / RAS:
4,78,50 4,68,89 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Construction of Bridge in lieu of existing causeway at Km 1/4 of Palayapalayam-Salapalayam-Perumapatty road
28500201. AS / TS / RAS:
2,85,00 2,69,85 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of bridge at km 64/4 of Erode - Dharapuram road. (6 x 17.40 m )
49400202. AS / TS / RAS:
4,94,00 4,44,67 ... ... 1
G.O.Ms.No. 20 / HW&MP (HW1 Dept, dt. 03.04.2017
Reconstruction of High Level bridge at km 1/4 of NH 47 to Kollapatty road in lieu of existing piped causeway
14225203. AS / TS / RAS:
1,42,25 ... ... ... 93,64
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
283
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Constuction of High level bridge at Km 32/4 of Omalur - Mecheri - Pennagaram Road (via) Perumbalai -NagavathiRiver-Location Village -Perumbalai-
39724204. AS / TS / RAS:
4,20,00 ... ... ... 96,06
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Constructio of Minor Bridge at Km.3/2 of Sokkadu - KRP dam Road in lieu of existing damaged culvert
14764205. AS / TS / RAS:
1,47,64 ... ... ... 97,19
G.O.Ms.No. 136 / HW&MP (EAP.II(2)) Dept, dt. 05.11.2020.
Reconstruction of bridge at km 1/10 of Renganathapuram road
14818206. AS / TS / RAS:
1,48,18 ... ... ... 97,55
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 17/2 (1) of pettavaithalai - Nangavaram - Kavalkaranpatti road via valayapatty
14818207. AS / TS / RAS:
1,48,18 ... ... ... 97,55
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of bridge at km 17/2 (2) of pettavaithalai - Nangavaram - Kavalkaranpatti road via valayapatty
14818208. AS / TS / RAS:
1,48,18 ... ... ... 97,55
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Construction of bridge at km 2/2 of Pethulupatti - Thiyagarajapuram road
14818209. AS / TS / RAS:
1,48,18 ... ... ... 97,55
G.O.Ms.No. 132 / HW&MP (EAP.II(2)) Dept, dt. 24.10.2020.
Reconstruction of High Level Bride at Km 1/10 of Amirthi - Jamunamarathur road across Naganathi
41100210. AS / TS / RAS:
4,52,00 9,60 ... ... 1,00,00
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
284
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of bridge at km 4/4 of Thanneerpandal - Kambiliyampatty - Lakkamanaikenpatty Road. (5x9.86 m - skew 70 deg. )
20000211. AS / TS / RAS:
2,00,00 1,73,40 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of High Level Bridge at Km 1/4 of Aragalur - Periyeri Road.
54500212. AS / TS / RAS:
5,99,00 16,47 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level Bridge at Km 1/0 off Km 0/4 of Sedimuthur Gopalapuram road - Kerala border to Thappataikilavan pudur Road (Annamalai Union cart road) 2 spans of 9.60m each.
25000213. AS / TS / RAS:
2,50,00 2,37,45 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High Level Bridge at Km 7/10 of Coimbatore - Thonda muthur - Narasipuram road (MDR) 3 Spans of 7.60m.
21000214. AS / TS / RAS:
1,75,00 1,33,27 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of Minor Bridge at Km 2/4 of Mettupalayam - Kicha kathur road (ODR)1 Span of 7.60m
11000215. AS / TS / RAS:
1,43,00 1,23,77 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High level bridge at Km 8/10 of Ganapathy- Athipalayam road. (ODR) 3 Spans of 8.60m each.
20000216. AS / TS / RAS:
2,50,00 1,49,71 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Minor Bridge at Km.1/2 of Valavadi - Therkku Poothanam Road (ODR) 3 spans of 8.60m each
15000217. AS / TS / RAS:
1,65,00 1,49,01 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1) Dept, dt. 25.11.16
285
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of high level Bridge at Km 19/10 of Pollachi - Dharapuram - Karur road. (SH) 5 Spans of 10.42m each
25000218. AS / TS / RAS:
2,75,00 2,59,53 ... ... 1
G.O.Ms.No. 20 / HW&MP (HW1 Dept, dt. 03.04.2017
Reconstruction of existing narrow LBP canal bridge at km 29/2 of Perundurai - Maccinancombai road
26478219. AS / TS / RAS:
2,91,00 ... ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High Level Bridge at Km 21/8 of Denkanikottai-Anchetty-Nattrampalayam Road in Lieu of Existing Causeway
40000220. AS / TS / RAS:
4,40,00 4,28,79 ... ... 1
G.O.Ms.No. 28 / HW&MP (HW1) Dept, dt. 11.02.2016
construction of High level bridge at km 0/10 of Sowripalayam-Porasalpatti road across ThirumaniMutharu in lieu of existing piped causeway.
40000221. AS / TS / RAS:
4,40,00 2,32,61 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge 3/8 of Kaspapetai-Kanagapuram road( 2 x 7.60 m )
12000222. AS / TS / RAS:
1,26,00 1,14,27 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High Level bridge at km 0/4 of km 5/0 of Omalur- Sankari Road to Muthunaickenpatty Road
31000223. AS / TS / RAS:
3,20,00 2,74,49 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Bridge at km 0/8 of Vadakarai vaaikkal - Narimedu road
25000224. AS / TS / RAS:
2,50,00 2,34,86 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
286
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconsruction of Distressed bridge at km 139/10 Pondy - Krishnagiri road across Muraiyaru
20000225. AS / TS / RAS:
2,20,00 2,02,73 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High level bridge at km 17/8 of Karur - Esanatham - Koombur - Vedasanthur road in lieu of existing piped causeway ( 1 x 8.42 m)
8000226. AS / TS / RAS:
80,00 77,83 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of High level bridge at km 0/8 of Edukkathur road branches at km 18/2 of Thiruvannamalai-Kanji road across Cheyyar
45900227. AS / TS / RAS:
4,59,00 1,76,13 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge at km 46/4 of Pollachi - Dharapuram - Karur Road (SH 21)( 3 x 5.60 m ( skew 29 deg.)
15000228. AS / TS / RAS:
1,65,00 1,50,13 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge at km 13/6 of Anthiyur-Ammapettai road ( 2 x 7.60 m)
10200229. AS / TS / RAS:
1,12,00 1,09,40 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of Bridge at km 1/4 of Jalagandapuram-Chinnappampatti Road to Vellalapuram and Akkaraipatti Road.
22000230. AS / TS / RAS:
2,42,00 2,19,54 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of Bridge at Km 6/4 of Bargur Chithagampalli road
12000231. AS / TS / RAS:
1,32,00 1,21,41 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
287
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of bridge at Km. 4/10 of Valavanthi-Thulayanatham (via) Mangalam road
13200232. AS / TS / RAS:
1,36,00 61,33 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Bridge at km 12/4 of Mannarkudi- Orathanadu - Thiruvonum Road
10500233. AS / TS / RAS:
1,15,50 1,02,20 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of weak and Narrow bridge at km 16/4 of vadavalam - Puthupatti road
18000234. AS / TS / RAS:
1,98,00 1,66,74 ... ... 1
G.O.Ms.No. 20 / HW&MP (HW1 Dept, dt. 03.04.2017
Construction of bridge at Km 2 /10 Kallimandayam - Odaipatti road
32500235. AS / TS / RAS:
2,84,00 1,76,59 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Bridge at Km 1/6 of Goundanaickenpalayam Boyempalayam road. (ODR) 4 Spans of 8.42m each.
15000236. AS / TS / RAS:
1,65,00 1,19,70 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High Level Bridge at Km 6/2 of Vallathirakottai road to Vandakottai Road.
23700237. AS / TS / RAS:
2,60,00 10,46 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High Level Bridge at km 38/10 of Thirukattupalli Sengipatty pattukottai Road
40000238. AS / TS / RAS:
4,40,00 9,58 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1) Dept, dt. 12.03.2018.
288
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of Bridge at Km 28/8 of Musiri - T.Pet - Murugur - Eragudi road
14387239. AS / TS / RAS:
1,58,25 ... ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of high level Bridge at km 0/8 of Road branching from km 8/10 of Perumanadu - Konnaiyur road to Athangadu Thirunattampatti road
26400240. AS / TS / RAS:
1,99,90 1,46,72 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge at km 4/6 of Puvanoor - Kalacherry - Munnavalkottai road.
20000241. AS / TS / RAS:
1,95,00 1,15,35 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km 33/10 of Kottaikadu road.
18900242. AS / TS / RAS:
1,99,99 11,15 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Bridge at Km 5/4 of Keelapazhur - Thirumazhapadi - Pullambadi road
19326243. AS / TS / RAS:
2,12,58 ... ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of High level bridge at km 1/2 of Sengamedu-Manamadai-Vettikkadu road.
36000244. AS / TS / RAS:
3,90,00 2,73,75 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Construction of high level bridge in the road connecting km 37/6 of TPACS(SH40) road and km 5/4 of Kongaraya kurichi-Manakkarai road across Tamirabarani river
163200245. AS / TS / RAS:
17,95,20 16,10,95 323,01,14 284,83,66 1
G.O.Ms.No. 116 / HW&MP (HW1) Dept, dt. 19.12.2013
289
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of bridge at km 0/4of Mathayanipatti - Kathalur across Koraiyar River
35000246. AS / TS / RAS:
3,76,80 3,59,86 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Construction of High Level Bridge at Km 7/2 of Thirunallur Viralimalai Road
92500247. AS / TS / RAS:
9,25,00 4,37,51 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Reconstruction of a bridge at km 1/10 Vaithur Road
23300248. AS / TS / RAS:
1,99,90 1,81,83 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge at km 0/2 of Ayakaranpulam - Pannal Road
24400249. AS / TS / RAS:
2,68,00 2,34,97 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge across Nattar river at km 0/2 of Konerirajapuram village road.
20000250. AS / TS / RAS:
1,99,90 1,85,55 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km 4/8 of Kuravappulam -Karuppampulam - Kadinelvayal Road
20000251. AS / TS / RAS:
2,20,00 1,94,87 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge at Km.8/8 of Eluppur-Valanadu road across Vellar River
14300252. AS / TS / RAS:
2,28,00 15,71 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
290
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High Level Bridge at Km 7/2 of Myladumparai – Thangammalpuram Road(Via) Moolakadai, Vaikalparai.
30000253. AS / TS / RAS:
3,30,00 2,12,13 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of bridge at km 0/2 of Panjanathikulam Middle sethi road
20000254. AS / TS / RAS:
2,00,00 1,69,64 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of Bridge at Km.0/8 of Thavasipudur - Vadugapatty Road
19800255. AS / TS / RAS:
1,99,90 1,45,76 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of Bridge at km 1/3 of Poolanathapuram-Kuchanur Road
57500256. AS / TS / RAS:
6,32,50 4,85,57 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Reconstruction of bridge at km 0/2 of Mappillaikuppam - Anaikkuppam - Selvapuram road
22500257. AS / TS / RAS:
2,25,00 77,15 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of High Level Bridge at Km 14/4 of KARAMADAI Periyapatty - Negamam road (via) Amanthakadavu. (ODR)4 Spans of 6.60m each.
17000258. AS / TS / RAS:
1,85,00 1,72,09 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Minor Bridge at Km 10/4 of Aruppukottai - Kurunthanmadam Road.
14000259. AS / TS / RAS:
1,44,00 1,21,65 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
291
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of bridge at Km.2/2 of Thummanatty-T.Manihatty road. (ODR) Single span of 7.60m.
10000260. AS / TS / RAS:
1,10,00 80,32 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge at Km.1/10 of Kolakkanatham - Siruganpur road
13200261. AS / TS / RAS:
1,45,00 1,02,08 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of High Level Bridge at Km.1/2 of Kiliyur - Agaram road
25000262. AS / TS / RAS:
2,75,00 1,79,86 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of Bridge at Km 5/10 of Melakaruppur - Vadugarpalayam road.
18000263. AS / TS / RAS:
1,97,90 1,79,18 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km 5/4 Thathanur-Vanathirayan pattinam Road
20000264. AS / TS / RAS:
1,99,90 1,83,48 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge at km 4/2 of Aathanur - Mandapam - Vaduvoor road
16800265. AS / TS / RAS:
1,70,00 1,40,75 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of High Level Bridge at Km 3/6 of Kolakkanatham - S.Kudikadu road.
22000266. AS / TS / RAS:
2,30,00 1,72,24 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
292
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of Bridge at Km 19/6 of Thirumanur - Ellakurichi - Thoothur road
15480267. AS / TS / RAS:
1,70,28 ... ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of bridge at Km.5/4 of Koppampatti-Vishvambalsamudram-B.Mettur road across Thazhaiyar river
9900268. AS / TS / RAS:
1,08,90 32,30 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High level Bridge at km.87/6 of Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar road.
12475269. AS / TS / RAS:
1,37,20 3,74 ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of Bridge at Km 0/10 of Nilaiyur - Eripurakarai road.
20500270. AS / TS / RAS:
2,25,50 10,56 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of bridge at Km.4/2 & 4/6 of Paithamparai-Serugudi road
14800271. AS / TS / RAS:
1,62,00 64,45 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of bridge at Km.12/2 of Ariyalur-Ayanathur road.
14200272. AS / TS / RAS:
1,56,00 5,10 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.2018.
Reconstruction of Bridge at Km 6/6 of Ramanathapuram - Emaneswaram Road To P.Kodikulam Road.
31000273. AS / TS / RAS:
2,97,50 2,67,24 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
293
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High Level Bridge Across Thenpennaiyaru connecting the villages Edathanur - Thiruvadathanur
91500274. AS / TS / RAS:
10,00,00 6,01,59 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of High level Bridge at km.87/2 of Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar road.
12412275. AS / TS / RAS:
1,36,50 3,71 ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Reconstruction of culvert at km 2/8 of Avudaiyarkoil- Kottaipattinam Road to Udaiyarkoil Road
6500276. AS / TS / RAS:
71,50 2,42 ... ... 1
G.O.Ms.No. 11 / HW&MP (HW1) Dept, dt. 01.02.2018.
Reconstruction fo Bridge at Km 0/8 of Kuravankulam road
16000277. AS / TS / RAS:
1,76,00 1,29,52 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of a bridge at km 0/2 NH-210 to Mathur Road
23000278. AS / TS / RAS:
1,99,90 1,22,81 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Construction of Bridge at Km.0/4 of Kooranur Road across Malattar River 11 x 14.00m
74500279. AS / TS / RAS:
8,15,00 6,16,38 ... ... 1
G.O.Ms.22, HW&MP(HW.1)Dept.,dt 20.2.15
Construction of bridgeat km 4/2of Perambalur - manamadurai road to Velur
36500280. AS / TS / RAS:
4,00,00 2,87,22 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
294
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Constrcution of High level bridge at km 9/6-8 of Thiruppathur - Alangudi road
75000281. AS / TS / RAS:
7,62,00 3,20,30 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of Bridge at km.57/6 of Palayamkottai - Kurukkusalai - Kulathur - Vilathikulam - Nagalapuram- Pandalkudi - Aruppukottai road.
25725282. AS / TS / RAS:
2,83,50 2,92 ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of High Level Bridge at Km 2/2 of Natham - Nediyamanickam Road.
50000283. AS / TS / RAS:
5,00,00 1,69,68 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High level bridge at km.25/8 of Kadayam -Mukkudal road (SH-40A)
46563284. AS / TS / RAS:
3,75,00 6,76 ... ... 1
G.O.Ms.No. 57 / HW&MP (HW1) Dept, dt. 20.03.2020.
Construction of Minor bridge at km 3/2 of Malakottai Nainapatti road
21900285. AS / TS / RAS:
2,19,00 1,74,30 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Minor Bridge at Km 3/10 of Chithurajapuram- E.T.Reddiyapatti Road
15000286. AS / TS / RAS:
1,50,00 1,26,43 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of Minor Bridge at Km 1/6 of Amathur to meet Alagapuri - Virudhunagar Road (Via) Moolipatti Road.
17500287. AS / TS / RAS:
1,76,00 1,67,87 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
295
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Construction of High level bridge across Mayura river at Km 7/6 of Kattumayilur - Kongarampalayam road. (3 Spans) 19.60 Mts.
76000288. AS / TS / RAS:
4,60,00 1,87,69 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Minor Bridge at Km 7/4 of Saliyamangalam - Sadaiyarkoil Road
15000289. AS / TS / RAS:
1,55,00 1,19,08 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of bridge across Mushkundha river at Km 51/10 of Vellimalai - Moolakkadu - Pudur road. (4 Spans 8.60 mt each)
20000290. AS / TS / RAS:
2,20,00 65,94 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Construction of bridge at Km 8/8 of Ambilikkai - Kuthilipai road
30000291. AS / TS / RAS:
3,30,00 77,52 ... ... 1
G.O.Ms.No. 33 / HW&MP (HW1 Dept, dt. 12.03.18
Reconstruction of High level bridge at Km.0/4-6 of Kariyanur - Lakshmanapuram road.
36800292. AS / TS / RAS:
4,04,80 7,42 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Bridge at Km 0/2 of Chinnapulikudikadu - Ragavambalpuram Road
15000293. AS / TS / RAS:
1,55,00 1,16,07 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km 2/2 of road branching from Km 0/10 of Ponnamaravathi - Ulagampatti road to Murugapatti (via) Pidarampatti.
12900294. AS / TS / RAS:
1,41,90 21,02 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
296
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 JZ 16 07( DPC )
Reconstruction of bridge at Km.1/2 of Elumur - Malavarayanallur road.
20000295. AS / TS / RAS:
1,98,00 1,48,00 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of High level bridge at Km 1/2 of Vaniyampatti to Maniyampallam road
64200296. AS / TS / RAS:
6,42,00 4,84,50 ... ... 1
G.O.Ms.No. 116 / HW&MP (HW1 Dept, dt. 25.11.2016
Reconstruction of bridge at Km.14/4 of Kallathur-Papakudi-Melanikuzhi - road.
14000297. AS / TS / RAS:
1,54,00 1,08,93 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Reconstruction of Bridge in between Vellalar steet and Adi Dravidar steet to Edaiyathi Village across GA canal
17500298. AS / TS / RAS:
1,79,80 79,26 ... ... 1
G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018
Reconstruction of Bridge at Km. 3/6 of Puthuviduthi - Vettuvakottai - Karambakudi Road.
16500299. AS / TS / RAS:
1,81,00 56,49 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
Construction of bridge at Km 7/2 of Ayyalore - Alampatty road
26000300. AS / TS / RAS:
2,70,00 89,41 ... ... 1
G.O.Ms.No. 184 / HW&MP (HW1) Dept, dt. 14.11.18
64 Lands 5054 04 337 JZ 64 06( DPC )
Acquisition of Lands
7131. AS / TS / RAS:
7,13 ... 1 1 1
G.O.(D) No.92, HW&MP Dept., dt.24.04.17
1,138,36,16 314,08,87 323,01,15 284,83,67 394,94,315054 04 337 JZTOTAL -
297
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KA Bye Pass Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 KA 16 06( DPC )
Forming Bye-Pass Road in Mudukulathur Town km 0/0-4/090 (Branching at Km. 225/885 and ending at Km.229/265 of SH29)
1830001. AS / TS / RAS:
18,30,00 ... ... ... 18,30,00
G.O.Ms.No.20, Highways and Minor Ports (HQ1)Dept., Dated:.23.01.2020
64 Lands 5054 04 337 KA 64 05( DPC )
Tirupathur ByepassFormation of Bye-pass to Thirupathur town branches at Km Km 115/4 of Salem – Tiruupattur – Vaniyambadi road and joints at Km 3/2 of Tirupattur – Singarapet road
2197001. AS / TS / RAS:
21,97,00 8,31,81 105,49,57 114,82,55 13,65,19
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012 G.O.Ms.No.21, Highways (HP.2)Dept., Dated:.24.01.2020
Arcot ByepassFormation of Bye-pass to Arcot town branches at Km 2/2 of Arcot – Villupuram road and passes through Arcot-Kannamanagal road and ends at Km 138/8 of Krishnagiri – Ranipet road Length 3.46 Km
6544002. AS / TS / RAS:
65,44,00 2,01,00 ... ... 33,42,99
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012 G.O.Ms.No.162, Highways and Minor Ports (HP2)Dept., Dated:.17.12.2020
Formation of bye pass road for Mayiladuthurai town, starting at km 28/6 of Kumbakonam - Sirkali Road and joining at km 4/4 of Thiruthuraipoondi - Mayiladuthurai road.
2133003. AS / TS / RAS:
57,00,00 21,33,00 ... ... 35,67,00
G.O.Ms.No.84, Highways and Minor Ports (HV2)Dept., Dated:.13.07.2011 G.O.Ms.No.78, Highways and Minor Ports (HP2)Dept., Dated:.28.09.2017
Forming Byepass to Namakkal Town (Starts Mudhalaipatty Pudhur at Km 248/0 of NH 7 and joins at Km 259/820 vallipuram of NH7) 22.66 Km (Actual length=22.387 km)
8700004. AS / TS / RAS:
87,00,00 18,14,27 ... ... 39,49,45
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012 G.O.Ms.No.82, Highways and Minor Ports (HP2)Dept., Dated:.25.05.2016 G.O.Ms.No.43, Highways and Minor Ports (HP2)Dept., Dated:.30.05.2019
Formation of Bypass to Tiruchengode Town branches in left side at Km 25/6 of Malliakarai – Rasipuram – Tiruchengode – Erode Road and joins in left side of Km 83/870 of Malliakarai – Rasipuram-Tiruchengode-Erode Road 13.60 km (Actual Length=12.74 km)
8743005. AS / TS / RAS:
87,43,00 5,85,00 ... ... 51,58,00
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012 G.O.Ms.No.21, Highways (HP.2)Dept., Dated:.24.01.2020
298
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KA Bye Pass Works
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
64 Lands 5054 04 337 KA 64 05( DPC )
Formation of bypass to Tenkasi town starting from km 55/2 of Tirunelveli-Palayankottai-Ambasamudram - Tenkasi-Kutralam-Senkottai Road and ends at km 123/6 of Tiruchendur-Palayankottai-Ambasamudram-Tenkasi-Kutralam-Senkottai Road (6.00Km)
1353646. AS / TS / RAS:
13,53,64 13,43,73 ... ... 1,00
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012
Formation of bye pass to Mudhukulathur Town at Thanjavur - Sayalkudi road branches at km 226/2 and ends at km 229/385 (4.00 km)
710367. AS / TS / RAS:
25,40,36 5,29,41 ... ... 15,10,95
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012
Formation of Bypass to Bhavani Town starts at Km 76/8 of Thoppur Mettur Bhavani – Erode road (SH 20) and ends at Km 82/6 of Thoppur Metur – Bhavani- Erode Road (SH 20)and NH 47 Junction 11.00 (Actual length = 8.20 km)
5630008. AS / TS / RAS:
56,30,00 7,11,88 ... ... 1
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012 G.O.Ms.No.21, Highways (HP.2)Dept., Dated:.24.01.2020 G.O.Ms.No.141, Highways (HS.1)Dept., Dated:.09.11.2020
Formation of Bypass to Ambasamudhram town road starting from km 90/2 of S.H.40 - Tiruchendur-Palayankottai-Ambasamudhram-Tenkasi-Kutralam-Sengottai road and ends at km 92/4 of SH 40 (6.049 km)
2753699. AS / TS / RAS:
27,53,69 11,97,01 ... ... 50,75
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012
Formation of Bypass to Sankarankoil town road starting at km 28/0 of SH 41 - Rajapalayam-Sankarankoil-Tirunelveli road and ends at km 34/0 of SH 41 (6.89 km)
24472910. AS / TS / RAS:
24,47,29 15,37,48 ... ... 51,50
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012
Tiruvannamalai ByepassFormation of Bye-pass to Tiruvannamalai town road branches at Km 112/4 of Cuddalore-Chithoor road and joints at Km 112/6 of NH 66
8566311. AS / TS / RAS:
8,56,63 8,25,00 ... ... 31,62
G.O.Ms.No.8, Highways and Minor Ports (HS2)Dept., Dated:.20.01.2012
492,95,61 117,09,59 105,49,57 114,82,55 208,58,465054 04 337 KATOTAL -
299
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KD Upgradation of Panchayat Union Roads / Panchayat Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 KD 16 00( DPC )
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
300001. AS / TS / RAS:
3,00,00 ... ... ... 2,75,00
G.O.(2D) No.44, Highways and Minor Ports (HF 1) Dept dt. 04.11.2020
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
25195602. AS / TS / RAS:
260,63,91 16,61,34 ... ... 125,00,00
G.O.(2D) No. 45, Highways and Minor Ports (HF 1) Dept dt. 15.10.2019
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
86741603. AS / TS / RAS:
925,36,22 693,96,48 ... ... 56,00,00
G.O.(2D) No. 85, Highways and Minor Ports (HF 1) Dept dt. 27.11.2018
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
110000004. AS / TS / RAS:
1,145,17,97 ... ... ... 766,47,06
G.O.(2D) No.12, Highways and Minor Ports (HF 1) Dept dt. 04.06.2020
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
10563855. AS / TS / RAS:
111,97,44 102,46,14 ... ... 30,00
G.O.(Ms) No. 50, Highways and Minor Ports (HF 1) Dept dt. 05.04.2018
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
109976016. AS / TS / RAS:
1,099,76,01 ... ... ... 999,76,01
G.O.(2D) No.53, Highways and Minor Ports (HF 1) Dept dt. 30.12.2020
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
12750527. AS / TS / RAS:
132,16,12 118,68,61 1,050,00,00 1,250,00,00 50,13
G.O.(Ms) No. 88, Highways and Minor Ports (HF 1) Dept dt. 27.10.2017
300
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KD Upgradation of Panchayat Union Roads / Panchayat Roads
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KD
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 KD 16 00( DPC )
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
730008. AS / TS / RAS:
7,63,00 3,15 ... ... 1,00,00
G.O.(2D) No. 49, Highways and Minor Ports (HF 1) Dept dt. 29.10.2019
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
6175459. AS / TS / RAS:
64,84,81 5,72,89 ... ... 20,25,11
G.O.(2D) No.50, Highways and Minor Ports (HF 1) Dept dt. 29.10.2019
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
66229310. AS / TS / RAS:
69,86,62 5,86 ... ... 27,30,47
G.O.(2D) No.3, Highways and Minor Ports (HF 1) Dept dt. 31.01.2020
Upgradation of Panchayat Union Roads/Panchayat Roads to ODR Standard
895484411. AS / TS / RAS:
946,29,17 106,57,61 ... ... 370,25,41
G.O.(2D) No. 46, Highways and Minor Ports (HF 1) Dept dt. 15.10.2019
4,766,71,27 1,044,12,08 1,050,00,00 1,250,00,00 2,369,59,195054 04 337 KDTOTAL -
301
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KE Upgradation of Panchayat Union Roads / Panchayat Roads under NABARD Assistance
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KE
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 KE 16 08( DPC )
Upgradation of Panchayat Union Roads/Panchayat Roads under NABARD Loan Assistance
01. AS / TS / RAS:
... ... ... ... ...
... ... ... ... ...5054 04 337 KETOTAL -
302
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
337 Road Works
KJ Construction / Re-Construction of Bridges under State Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 337 KJ 16 08( DPC )
Construction of minor bridge in lieu of exiting piped causeway at km 0/6 of moolakarai road 3 X 9.42 m) (45 skew)
188591. AS / TS / RAS:
1,88,59 ... ... 50,00 1,38,59
G.O.Ms.No. 94 / HW&MP (HS1) Dept, dt. 29.07.2020
Construction of Bridge at Km 3/6 of Vedasandur-Koombur road (via) Nagakonanur (near Karupathevanur)
320002. AS / TS / RAS:
3,20,00 ... ... ... 3,05,00
G.O.Ms.No.143 / HW&MP (HS1) Dept, dt. 13.11.2020
Construction of minor bridge in lieu of exiting piped causeway at km 1/4 of koorapalayam road for under state funds.(3 x 9.42 m)
190313. AS / TS / RAS:
1,90,31 ... ... 50,00 1,40,31
G.O.Ms.No. 94 / HW&MP (HS1) Dept, dt. 29.07.2020
Construction of Bridge at km 0/2 of connecting road of Thirukkurnam and Narasingapuram Villages
1000004. AS / TS / RAS:
10,00,00 ... ... ... 9,85,00
G.O.Ms.No.143 / HW&MP (HS1) Dept, dt. 13.11.2020
Construction of High level bridge at Km.21/2 of Gudiyatham - Gadambur - Kailasagiri - Vaniyambadi road
1693005. AS / TS / RAS:
16,93,00 ... 6,77,20 2,00,40 14,92,60
G.O.Ms.No. 36 / HW&MP (HQ2) Dept, dt. 12.02.2020
33,91,90 ... 6,77,20 3,00,40 30,61,505054 04 337 KJTOTAL -
303
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
789 Special Component Plan for Scheduled Castes
JA Improvement to Rural Roads with loan assistance from NABARD under Special Component Plan
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 789 JA
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 04 789 JA 16 00( DPC )
Improvemets to Rural Roads with loan assistance from NABARD under Special Component Plan- Land L.S Provision.
01. AS / TS / RAS:
... ... ... ... ...
64 Lands 5054 04 789 JA 64 09( DPC )
Improvemets to Rural Roads with loan assistance from NABARD under Special Component Plan- Land L.S Provision.
01. AS / TS / RAS:
... ... ... ... ...
... ... ... ... ...5054 04 789 JATOTAL -
304
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
RN Construction of Bridges under Tsunami Emergency Assistance Project (TEAP) with Loan assistance from Asian Development
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 RN
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 7 Chief Engineer (Highways) - NABARD and Rural Roads
16 Major Works 5054 80 800 RN 16 08( DPC )
Lands Lumpsum provision
2431. AS / TS / RAS:
2,43 1,05 1,57 1,57 1,57
GO Ms No.583 & 132, Revenue (NC-IV) dept., dt.20.10.2005 & 23.2.2006.
2,43 1,05 1,57 1,57 1,575054 80 800 RNTOTAL -
305
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JH Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JH
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
16 Major Works 5054 04 101 JH 16 02( DPC )
Construction of Grade Separator at the Intersection of Mount-Medavakkam and Pallavaram-Thuraipakkam road near Kilkattalai.
582200/6400001.
CMDP Division-I
AS / TS / RAS:
64,00,00 42,80,20 13,61,95 20,19,80 1,00,00
G.O.Ms. No.144, Highways and Minor Ports (HW 2) dated: 27.11.2015
widening the existing Railway over bridge at Km 20/8 of Mount Poonamalle Avadi road
1102782.
CMDP Division-II
AS / TS / RAS:
11,02,78 ... ... ... 5,02,78
G.O.Ms.No. 78, H&MP (HQ2), Dt. 31.07.2019.
64 Lands 5054 04 101 JH 64 01( DPC )
Construction of High level bridge across coovam river connecting Km 14/4 of Mount -Poonamallee-Avadi road and Paruthipattu - Thiruverkadu Municipal road.
31000/740001.
CMDP Division-II
AS / TS / RAS:
7,40,00 7,30,23 ... 9,76 1
G.O.Ms. No.140, Highways and Minor Ports (HW 2) dated: 26.11.2015. RAS G.O. (Ms).No. 17, H&MP (HP2) Dept., Dt. 25.02.2019.
82,42,78 50,10,43 13,61,95 20,29,56 6,02,795054 04 101 JHTOTAL -
306
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JI Construction of Bridges and Roads under Chennai City Traffic Decongestion Projects (CCTDP).
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
64 Lands 5054 04 101 JI 64 09( DPC )
Construction of Grade Separator at the intersection of ECR and Kalaignar Karunanidhi salai at Akkarai.
12294001.
CMDP Division-I
AS / TS / RAS:
122,94,00 ... 3,00 10,00 122,83,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade Separator at KM 4/4 of Inner Ring Road and P.T.Rajan Salai Junction.
3379002. AS / TS / RAS:
33,79,00 ... 3,00 10,00 33,68,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Road Over Bridge at Km 75/6 of Chennai – Thiruttani- Renigunta Road (SHU148) in lieu of existing two lane ROB
1350003.
CMDP Division-II
AS / TS / RAS:
13,50,00 ... 3,00 1 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade separator at Marmalong Bridge- Irumbuliyur Road covering Madampakkam road Junction, Tambaram Eastern Bypass and Camp Road Junction near Selaiyur
10300004. AS / TS / RAS:
103,00,00 ... 3,00 10,00 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade Separator along Chennai - Thiruthani - Renigunta Road at the intersection of Mount Poonamallee Avadi Road at Km 68/2 and at the intersection of Heavy Vehicles Factory Road at Km 69/0 at Avadi
7088005. AS / TS / RAS:
70,88,00 ... 3,00 10,00 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Multi level Grade Separator on Mount-Poonamallee-Avadi road from MIOT Hospital to Mugalivakkam via Ramapuram, L&T and DLF
3360006. AS / TS / RAS:
33,60,00 ... 3,00 10,00 33,49,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade Separator at the Junction of Rajiv Gandhi Salai with Sardar Patel road at Madhya Kailash.
4690007. AS / TS / RAS:
46,90,00 ... 3,00 10,00 46,79,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
307
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JI Construction of Bridges and Roads under Chennai City Traffic Decongestion Projects (CCTDP).
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
64 Lands 5054 04 101 JI 64 09( DPC )
Construction of Grade Separator at the Junction of Km 4/2 of Madhavaram Redhills road and Km 19/100 of Inner Ring Road
3051008.
CMDP Division-III
AS / TS / RAS:
30,51,00 ... 3,00 10,00 30,40,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade Separator at the Intersection of Kodambakkam - Sriperumbudur road and Poonamallee - Kundrathur - Pallavaram Road, including providing connectivity to ORR via Erikkarai Road at Kundrathur
11800009.
CMDP Division-IV
AS / TS / RAS:
118,00,00 ... 3,00 10,00 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Vehicular Underpass at the junction of Mount Medavakkam road & Southern sector of Inner Ring Road near Madipakkam
36250010. AS / TS / RAS:
36,25,00 ... 3,00 10,00 36,14,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade Separator at Km 6/5 of Marmalong Bridge – Irumbuliyur road near Kaiveli, Madipakkam
20000011. AS / TS / RAS:
20,00,00 ... 3,00 10,00 19,89,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Providing Skywalk, Escalator and other accessories connecting East Tambaram to West Tambaram with Multi Model Integration connectivity to existing Bus stand, Tambaram Railway station including improvements to existing Bus stand
6000012. AS / TS / RAS:
6,00,00 ... 3,00 10,00 5,89,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Providing Four lane Grade Separator at Km. 76/8 of Chennai-Thiruthani-Renigunta Road at the junction of Km.6/4 of Vanagaram – Ambattur Road
136800013.
CMDP Division-V
AS / TS / RAS:
136,80,00 ... 3,00 10,00 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of Grade Separator at Km 80/7 in Chennai – Thiruthani – Renigunta Road and Korattur Road.
191000014. AS / TS / RAS:
191,00,00 ... 3,00 10,00 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
308
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
04 District and other Roads
101 Bridges
JI Construction of Bridges and Roads under Chennai City Traffic Decongestion Projects (CCTDP).
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JI
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
64 Lands 5054 04 101 JI 64 09( DPC )
Construction of Grade Separator at the intersection of Mount - Poonamallee - Avadi road, Chennai – Chittoor - Bangalore road & Poonamallee - Kundrathur- pallavaram road at Kattupakkam in Poonamallee.
156400015.
CMDP Division-V
AS / TS / RAS:
156,40,00 ... 3,00 10,00 10,00
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
Construction of High Level Bridge across Coovam river at Padikuppam in lieu of existing bed level causeway connecting PadiKuppam road to Poonamallee High Road
2000016. AS / TS / RAS:
2,00,00 ... 3,00 10,00 1,89,99
G.O.Ms. No.24, Highways and Minor Ports (HW 1) dated: 28.01.2020
1,121,57,00 ... 48,00 1,50,01 331,78,915054 04 101 JITOTAL -
309
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
16 Major Works 5054 80 800 JW 16 08( DPC )
Formation of Tambaram Eastern By-Pass road Km 0/0-8/4(Land Acquistion only)
10000 /10000 / 7550401.
CMDP Division-I
AS / TS / RAS:
75,50,49 75,42,93 1 7,50 1
G.O(Ms) No. 264/ Highways (HW1) Dept dated: 23.09.2004. RAS G.O.Ms.No.104/ HW&MP (HP2) Dept, dated.26.08.2015
Widening the East Coast Road (ECR) to Six lane for Km 14/550 – 15/700 at Palavakkam Village.
1585002. AS / TS / RAS:
15,85,00 61 6,24,00 1,25,00 6,00,00
G.O.(Ms) No. 157, H&MP (HW1) Dept., Dt., 16.12.2019.
Formation of TEB branching at km 17/4 of Marmalong bridge - Irumbuliyur road from Rajakilpakkam (via) Agaramthen road towards Perungalathur in Km 3/900- 5/450 including the construction of drain in the left out stretch at Km 5/450 - 7/000
5261003. AS / TS / RAS:
52,61,00 ... ... 50,00 3,00,00
GO (D) No: 11 H & MP (HW2) Dept dt 06.01.2020.
Formation of Tambaram Eastern By-pass road branching from Km 17/4 of Marmalong Bridge - Irumbuliyur road from Rajakizhpakkam (via) Agaramthen road towards Perungalathur at Km 5/450 - 8/080
333563/3669004. AS / TS / RAS:
36,69,00 12,25,37 17,68,83 8,60,00 15,83
G.O (D) No: 61, HW & MP (HW2) Dept., dt. 21.03.2018.
Widening from two lane to four lane and strengthening of Mount-Madipakkam Road @ km 0/0-2/0.
27500/27500/2525175. AS / TS / RAS:
25,25,17 17,75,42 10,00 10,00 1
G.O.Ms.No.98/ Highways(HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015.
Construction of High level bridge across Coovam River connecting Km 14/4 of Mount - Poonamallee - Avadi Road and Paruthipattu - Thiruverkadu Municipal Road.
1678356.
CMDP Division-II
AS / TS / RAS:
16,78,35 ... 1,00,00 1,00,00 10,00,00
G.O.(Ms) No. 123, H&MP (HW1) Dept., Dt., 05.11.2019.
Widening from two lane to four lane and strengthening of Chennai - Chithoor - Bangalore road km 18/0 - 22/6
120000/1830627. AS / TS / RAS:
18,30,62 17,53,91 1 ... 1
G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.
310
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
16 Major Works 5054 80 800 JW 16 08( DPC )
Construction of Grade Separator at the intersection of Tambaram Road, Tambaram Velachery Road and Velachery Byepass Road at Velachery - Vijayanagaram
982200/10800008.
CMDP Division-II
AS / TS / RAS:
108,00,00 93,11,21 5,00,00 13,88,00 1,00,00
G.O.Ms. No.120/ Highways & Minor Ports/HWI/Dept.dt. 29.06.2012
Construction of Grade Separator at the intersection of lattice bridge road and east coast road at Thiruvanmiyur junction
21992009. AS / TS / RAS:
219,92,00 ... 10,00 10,00 30,00,00
G.O.(Ms) No. 19, H&MP (HW1) Dept., Dt., 21.01.2020.
Construction of Grade Separator connecting Medavakkam - Sholinganallur road junction, Medavakkam - Mambakkam road junction and Mount - Medavakkam road junction in Marmalong bridge - irumbuliyur road at Medavakkam.
1331000/146410010. AS / TS / RAS:
146,41,00 84,20,15 41,88,93 39,42,59 22,78,25
G.O.Ms. No.100 /Highways & Minor Port/HW2/Dept.dt. 14.08.2015.
Construction of Grade Separator in Periyar EVR Salai connecting the junction of Nelson Manickam Road and Anna Nagar Third Avenue near Aminjikarai.
1170000/122500011.
CMDP Division-III
AS / TS / RAS:
122,50,00 97,36,72 50,00 5,00 1
G.O.(D).No.222/HW&MP (HW-1) dated 18-11-2010
Formation of new link road connecting Greenways road (DGS Dinakaran Salai) with Durgabhai Deshmukh road through Tamil Nadu Music College
22840012. AS / TS / RAS:
22,84,00 9,22 ... 1,00,00 11,00,00
G.O. (Ms) No.76, H & MP (HW1) Dept., Dt. 24.07.2019.
Re-Construction of High level bridge across "B" Canal at Km 0/6 of T.P.P road (SH-56)
533100 /58640013.
CMDP Division-IV
AS / TS / RAS:
58,64,00 25,85,78 22,73,07 11,65,97 21,12,24
G.O.Ms.No.13/Highways and Minor Ports (HW-2) Dept dated: 13.01.2016
Providing Grade Separator at the intersection of Kundrathur and Santhai Road @ Pallavaram
807400/82660014. AS / TS / RAS:
82,66,00 52,96,51 20,33,76 10,21,00 19,48,00
G.O.Ms. No.120/ Highways & Minor Port/HWI/Dept.dt. 29.6.12
311
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
16 Major Works 5054 80 800 JW 16 08( DPC )
Construction of Grade Separator (LHS) and Pedestrian subway near Kolathur in Irattai Eri at the Junction of Perumbur Redhills Road in Inner Ring Road.
527200/55250015.
CMDP Division-V
AS / TS / RAS:
55,25,00 36,89,17 16,02,07 4,50,98 1,00,00
G.O.Ms. No.120/Highways and Minor Ports (HW 1) Dept dated. 29.06.2012
Widening from two lane to four lane and strengthening of Madhavaram - Red hills road Km 4/2-9/6.
80000/85700/29222316. AS / TS / RAS:
29,22,23 28,84,86 1 1 1
G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.2D (8) HW&MP (HWI) / dated. 20.09.2010
Construction of Grade separator in the Right Hand Side in Kolathur Irattai Eri at the junction of Perumbur Redhills road and Inner Ring Road.
291287/320300/ 41075017. AS / TS / RAS:
41,07,50 26,16,59 1 10,00,00 1,00,00
G.O.Ms. No.12/Highways and Minor Ports (HW 2) Dept dated: 11.01.2016 (AS). G.O.Ms. No.35/Highways and Minor Ports (HP 2) Dept dated: 07.03.2019.
64 Lands 5054 80 800 JW 64 07( DPC )
Forming six lane of ECR from km 11/8-23/2 Thiruvanmiyur to Akkarai (LA).
100000/3546600/77800001.
CMDP Division-I
AS / TS / RAS:
778,00,00 554,65,95 223,34,05 216,00,00 7,34,05
G.O.Ms. No.229/Highways and Minor Ports (HW1) Dept dated: 14.11.2005 (AS). G.O.Ms.No.104/ Highways&MP (HW1) Dept, dated.12.06.2012 (RAS I). G.O.(Ms).No. 48/ Highways & Minor Ports (HP2) Dept., Dated. 30.05.2019 (RAS II).
Widening from two lane to four lane and strengthening of Mount-Madipakkam Road @ km 6/6-8/6.
33000/1107492. AS / TS / RAS:
11,07,49 8,21,09 1 1 1
G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007 and G.O.Ms. No.100/Highways(HWI)/ dated. 11.06.2012
Construction of Grade Separator at Junction of ECR and Lattice Bridge Road at Thiruvanmiyur (LA only)
5800003.
CMDP Division-II
AS / TS / RAS:
58,00,00 28,05 57,52,56 57,52,56 19,39
G.O.Ms. No.99/Highways & MP Dept (HW2)/ dated. 14.08.2015
312
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
64 Lands 5054 80 800 JW 64 07( DPC )
Construction of HLB across coovam River at Nolambur Road junction in NH 4 (LA only)
3600004.
CMDP Division-II
AS / TS / RAS:
36,00,00 35,88,63 1 1 11,36
G.O.Ms. No.98/Highways & MP Dept (HW2)/ dated. 14.08.2015
2,010,58,85 1,167,52,17 412,47,33 375,88,63 134,19,185054 80 800 JWTOTAL -
313
Details of WorksEstimate
Amount
Expenditure upto
31-03-2020
Budget Estimate
2020-2021
Revised Estimate
2020-2021
Budget Estimate
2021-2022
5054 CAPITAL OUTLAY ON ROADS AND BRIDGES
80 General
800 Other Expenditure
KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund
[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KJ
DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT
21 10 Chief Engineer (Metro)
16 Major Works 5054 80 800 KJ 16 03( DPC )
Forming Link Road and Construction of bridge across Buckingham canal connecting Rajiv Gandhi Salai and East Coast Road at Neelankarai
20420001.
CMDP Division-I
AS / TS / RAS:
204,20,00 32,61 199,88,65 139,00,00 64,87,39
Go (Ms).No: 70/Highways & Minor Ports (HW2) Dept /dt. 19.06.2014
Construction of additional three Lane bridge across Coovam River in EVR Salai at Km 6/6 near Aminjikarai (Upstream side)
80000/80000/1110002.
CMDP Division-III
AS / TS / RAS:
11,10,00 10,05,03 1 1 1
G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.2012 RAS G.O. Ms No. 75/ H&MP (HP-2) D/ dt.23.09.2017
Construction of Grade Separator at the inter section of Kaliyamman Koil Street and City Bus entrance of CMBT with Jawaharlal Nehru Salai (IRR) at Koyambedu
935000/9350003.
CMDP Division-IV
AS / TS / RAS:
93,50,00 40,62,56 30,00,00 17,00,00 15,00,00
G.O. Ms No.118/ H&MP (HW-1) D/ dt.28.06.12 & RAS G.O. Ms No.95/ HM&P (HP2) D /dt.11.08.2015
Construction of FOB and sky walk with escalator at Km 26/8 of Grand Southern Trunk road Tambaram , Chennai
194900/1975004. AS / TS / RAS:
19,75,00 5,07,27 1,00,00 8,20,00 6,00,00
G.O.Ms. No.72/Highways&Minor Port/HW2/Dept.dt. 13.07.2015
Widening of High level bridge across Adayar river at Km 2/6 from Mount Poonamallee Avadi road near Ramapuram
154600/1700005. AS / TS / RAS:
17,00,00 14,02,43 1,00 1 ...
G.O.Ms. No.75/Highways&Minor Port/HW2/Dept.dt. 14.07.2015
Widening of the existing bridge at Km 3/4 of Mount - Poonamallee - Avadi road (SH-55)
10000/100006. AS / TS / RAS:
1,00,00 79,65 1 1 ...
G.O.Ms. No.118/Highways&Minor Ports/HWI/Dept.dt. 28.6.2012
346,55,00 70,89,55 230,89,67 164,20,03 85,87,405054 80 800 KJTOTAL -
314