F,edericten PLANNING ADVISORY COMMITTEE SEPTEMBER 15, 2021 - 7:00 PM IN PERSON AND WEB CON FERENCING AGENDA A. APPROVAL OF MINUTES Regular Meeting July 21 , 2021 B. ZONING APPLICATIONS 1. 12 Neighbours Community Inc Two Nations Crossing Rezone a portion from RLF to CDD to accommodate a 96 unit micro-housing community and social enterprise centre 2. WSP Canada Inc 1040 Prospect Street Rezone a portion from RC to COR-2 to accommodate 1 commercial lot Variances to recognize the existing retail store floor area C. SUBDIVISION APPLICATIONS 1. William & Karen Bird —28 Duncan Lane Subdivision to create 1 R-1 lot E. OLD BUSINESS F. NEW BUSINESS G. BUILDING PERMITS To receive building permits for the month of July and August 2021 H. ADJOURNMENT

Transcript of F,edericten - Fredericton.ca

F,ederictenPLANNING ADVISORY COMMITTEE

SEPTEMBER 15, 2021 - 7:00 PMIN PERSON AND WEB CON FERENCING

AGENDA

A. APPROVAL OF MINUTES

Regular Meeting — July 21 , 2021

B. ZONING APPLICATIONS

1. 12 Neighbours Community Inc — Two Nations Crossing

Rezone a portion from RLF to CDD to accommodate a 96 unit micro-housingcommunity and social enterprise centre

2. WSP Canada Inc — 1040 Prospect Street

Rezone a portion from RC to COR-2 to accommodate 1 commercial lotVariances to recognize the existing retail store floor area

C. SUBDIVISION APPLICATIONS

1. William & Karen Bird —28 Duncan Lane

Subdivision to create 1 R-1 lot

E. OLD BUSINESS

F. NEW BUSINESS

G. BUILDING PERMITS

To receive building permits for the month of July and August 2021

H. ADJOURNMENT

PLANNING REPORT

. PAC — September 15, 2021i’e eric en FileNo.: Z-31-21,P.R. No. 67/21

To: Planning Advisory Committee

From: Fredrick Van Rooyen, Planner

Proposal: Rezoning to accommodate the development of an affordable micro-homecommunity and social enterprise centre

Property: 269 Two Nations Crossing (PID 01533298)

OWNER: The LeBrun Family Foundation3523 Woodstock RoadFredericton, NB, E3E 1B7

APPLICANT: 12 Neighbours Community Inc. do Marcel LeBrun3523 Woodstock RoadFredericton, NB, E3E 1 B7

SITE INFORMATION:

Location: North side of Two Nations Crossing between SmartCentres and St. Mary’sFirst Nation

Context: Commercial development to the west along Two Nations Crossing, vacantland to the north, south and east, single detached dwellings and FirstNation lands further east

Ward No: 4

Municipal Plan: Commercial Centres and Corridors

Zoning: Retail Large Format (RLF)

Existing Land Use: Vacant

Previous Applications: None

EXECUTIVE SUMMARY:

12 Neighbours Community Inc. is proposing to develop a 96 unit affordable micro-homecommunity and social enterprise centre, which would include commercial (cafe/retail store), office,and light manufacturing (construction of micro-homes) uses.

The proposed micro-homes and social enterprise centre present a unique housing form andmixed-use building that do not fit within any of the current zones of the City’s Zoning By-law.Rezoning to the Comprehensive Development District (CDD) zone is recommended as itaccommodates development that due to its unique characteristics, innovation and unusual sitecharacteristics require specific regulations not available in other zones. The proposeddevelopment provides alternative housing options that are affordable within a complete

community design that includes convenient and direct access to commercial amenities,community amenities, and public transit.

Staff are of the opinion that the proposal is an innovative development that makes a significantcontribution to the supply of affordable housing in the City of Fredericton and is consistent withthe Municipal Plan and Growth Strategy.

APPLICATION:

12 Neighbours Community Inc., on behalf of the LeBrun Family Foundation, have made anapplication to rezone a portion of 269 Two Nations Crossing from Retail Large Format (RLF) toComprehensive Development District (CDD) to permit a 96 unit affordable micro-home communityand social enterprise centre, which would include commercial (cafe/retail store), office, and lightmanufacturing (construction of micro-homes) uses.

PLANNING COMMENTS:

Background:

. The City of Fredericton is currently facing challenges with respect to homelessness andaffordability. 12 Neighbours Community Inc. is a non-profit organization that looks toaddress these pressing challenges through a housing first approach.

. The Applicant has conducted focus groups with potential community members to assesstheir needs and perspectives on locations in Fredericton. The focus groups highlighted theimportance of being in close walking distance to key amenities, specifically a grocerystore, pharmacy, and public transit.

. This proposal is timely as the City is currently undertaking a Housing Needs Assessmentwith the prospect of establishing an Affordable Housing Strategy. The Applicant haspresented the potential development to the City’s Affordable Housing Committee as wellas St. Mary’s First Nation and has indicated that the project would be supported by GNB’sAffordable Rental Housing Program (ARHP) through capital grants and rent supplements.

Proposal:

. This application is unique in its innovative approach to affordable housing and makes asignificant contribution to the supply of affordable housing in the City of Fredericton. Thedevelopment would include a total of 96 micro-homes (tiny homes), each being 23.41square metres in area (1O.5’x24’), and a 988 square metre social enterprise centre, whichwould include commercial (cafe/retail store), office, and light manufacturing (constructionof micro-homes) uses.

. The subject property is 26.33 hectares in size, with approximately 4.6 hectares beingzoned Retail Large Format and within the Growth Boundary. The proposed developmentwould cover approximately 3.24 hectares, extending just beyond the Walmart building tothe west.

• The development would gain access from SmartCentres Way and include a six (6) metrewide private road that extends north/south through the site, with 1.2 metre internalpathways accessing the micro-homes on each block. The main private road is intended to

function as a shared road with primarily pedestrian and bicycle traffic, but enough spaceto accommodate vehicles and emergency vehicles as needed.

. The below sections provide further details on the proposed micro-homes, social enterprisecentre and phasing.

Micro-Homes

. Each micro-home would be single or double occupancy and equipped with a 3-piecebathroom, kitchen, living room sofa that converts to a double bed (or two single beds) adining room table, and loft storage space. The homes would also feature a covered frontdeck.

. The residential portion of the development would include blocks of 6 micro-homes, eachhaving a 9-metre-wide shared greenspace in the middle (see Maps II & Ill). There wouldbe one block of 6 homes on each side of the main road, resulting in mini communities of“12 Neighbours” each.

. Beyond the main private road, each micro-home would be accessed by a 1 .2 metre widepathway that loops around the central shared greenspace. Each micro-home would beoriented towards the central shared greenspace and have a private side yard.

. The development includes a total of 76 vehicle parking spaces, 20 bicycle parking spacesalong with individual bicycle parking at each micro-home. The subject property is within130 metres of public transit stops 14N/15S, located on the Walmart property to the west.

. The micro-home building design shown on Maps Ill and IV will be used for phase 1 of thedevelopment. The Applicant intends to introduce additional designs in future phases toprovide more visual interest and diversity in the community.

Social Enterprise Centre

. The social enterprise centre will be the focal point and anchor of the community (see MapsV & VI). The main building would be approximately 988 square metres in area, two storeysin height, and house three micro-enterprises: a café, retail/art store, and a micro-homeconstruction enterprise. These micro-enterprises are intended to function as trainingbusinesses for individuals who live in the community.

. In addition to the commercial and light manufacturing uses of the social enterprise centre,the building would include the main administrative office, training and support space, anda private community area for the residents.

• The front portion of the property contains a right-of-way in favour of NB Power for theexisting hydro corridor. Consequently, this area would be utilized for commercial parkingand open space.

• Staff would note that the social enterprise centre building design shown on Maps V andVI are currently conceptual and would be finalized at the time of building permitapplication.

Phasing

The 96 unit affordable micro-home community would be developed in four phases overfour years.

0 Phase 1 (November 2021 — March 2022): development of 12 micro-homes,temporary office, entrance road and interim parking

0 Phase 2 (April 2022 — March 2023): development of the social enterprise centre,24 additional micro-homes, full parking areas, and community garden

0 Phase 3 (April 2023 — March 2024): development of an additional 36 micro-homes

0 Phase 4 (April 2024 — March 2025): development of the final 24 micro-homes

Growth Strategy:

This proposal is consistent with the community goals of the Growth Strategy by providingalternative housing options that are affordable within a complete community design thatincludes convenient and direct access to commercial amenities, community amenities,and public transit.

Municipal Plan:

As areas within the Commercial Centres and Corridors designation continue to grow andevolve over time, more attention will be given to transit, active transportation, and thepedestrian realm. The proposal recognizes this evolution and looks to establish a mixed-use development that capitalizes on proximity to commercial amenities and public transit.

The Commercial Centres and Corridors designation encourages new compatible uses andbuilt forms that contribute positively to the public realm. The proposal looks to establish apedestrian-oriented community that is anchored by a main commercial building. In staff’sopinion the proposed development would be considered compatible with the abuttingSmartCentres development and promotes a more complete community.

The proposal supports the Municipal Plan’s objectives for affordable housing, including:

0 Section 3.1 .1(5): develop and maintain relationships with other levels ofgovernment, community organizations, the private sector, and others to buildingcommunity capacity in support of:

. i. Quality communal housing that positively contributes to the visualcharacter of the neighbourhood, which may include assisted living, clusterhousing, and housing for older adults; and,

• ii. Housing for vulnerable populations, including emergency shelters,transitional housing and group homes

o Section 3.1.1(6): While the provision of affordable housing is a core responsibilityof the provincial and federal governments, the City will encourage the provision ofan adequate supply of affordable housing by:

• i. Making available City-owned land for affordable residential developmentwhere appropriate

S jj• Where enabling legislation permits, consider incentives for an increasedsupply of affordable housing

0 Section 3.1.2(1): Develop zoning by-law regulations that would allow for theappropriate and compatible integration of innovative housing forms, such as micro-homes, cohousing, small lot developments and cluster housing

0 Section 3.1 .2(2): Work with the private sector and not-for-profit organizations tosupport the provision of adequate supply of affordable housing, recognizing thatthe provincial government is still responsible for the delivery and financing ofaffordable housing

0 Section 3.1.2(4): Implement zoning and other applicable regulatory measures toencourage affordable housing, including for the creation of smaller units and higherdensity developments.

With the proposal including 96 affordable micro-homes, staff are of the opinion that the proposeddevelopment is an innovative housing form that makes a significant contribution to the supplyof affordable housing in the City of Fredericton and is consistent with the Municipal Plan.

Comprehensive Development District Zone:

The Comprehensive Development District (ODD) zone accommodates development thatdue to its unique characteristics, innovation or unusual site characteristics requiresspecific regulations not available in other zones. The micro-home community and socialenterprise centre are unique and better addressed within the ODD zone.

• The permitted use for the ODD zone as it relates to the subject property is multi-residential,commercial, and mixed-use. The ODD zone has been sought to provide additionalflexibility and to be developed in a manner that is integrated in terms of density, dwellingunit size, parking, building height, landscaping, setbacks, and amenity requirements. TheODD zone standards will be based on the following:

Standard Comprehensive Development District

Building Height (max) I) Micro homes: 4.8 metres measured from grade to thehighest point of any portion of the roof, and3 metres measured from the finished floor to the requiredeave line

ii) Social Enterprise Centre: 9 metres

Building Setbacks (mm)

Front property line 6 metres

Side property line 3 metres

Rear property line 6 metres

Density (max, lot area per dwelling unit) 25 dwelling units per hectare (Mm 425 sq.m. per dwellingunit)

Dwelling unit floor area (mm) 23 square metres

Parking (mm) i) Micro-homes: 0.34 spaces/unit

ii) Social Enterprise Centre: 3.5 spaces/i 00 square metresNFA

Bicycle Parking (mm) i) Micro-homes: 1 space/unit

ii) Social Enterprise Centre: 1 space/100 square metresNFA

No. of buildings Allows more than 1 main building on a lot

Building Height

. The building height for the micro-homes is consistent with the provisions for accessorybuildings (Section 4.2(3)(d)), reflecting the tiny home design with loft storage space.

. The building height for the social enterprise centre is consistent with the provisions in theNeighbourhood Commercial (NC) zone, recognizing that the commercial building isprimarily intended to serve the residents of the 12 Neighbours Community.

Setbacks

. The building setbacks are consistent with several commercial zones, recognizing that dueto the lot configuration and NB Power hydro corridor in the front yard, the buildings arefurther from the street and the rear lot line is well beyond the growth boundary anddevelopment area.

. The social enterprise building has been setback 6 metres from the side lot line and themicro-homes have been setback 3 metres from the side lot line, which will require anappropriate landscape buffer recognizing the existing commercial zoning to the east andwest.

Density

. Based on the land area to be rezoned ODD as shown on Map I, the proposed developmentis approximately 21 units per hectares and provides approximately 479 square metres perdwelling unit. Recognizing the unique site characteristics and layout, the recommendeddensity standards of a maximum 25 dwelling units per hectare and a minimum 425 squaremetres per dwelling unit provide flexibility in future phases.

Vehicle Parking

• The Applicant has noted that between 10-20% of residents are anticipated to havevehicles. With 96 micro-home units, at a rate of 0.2 spaces/unit, the parking demand wouldbe 20 residential parking spaces. As seen in Map II, two residential parking areas areproposed, one with 19 spaces and another with 14 spaces, for a total of 33 residential

parking spaces, which would be 0.34 spaces/unit. In comparison, the residential parkingrequirement in Section 5 of the Zoning By-law would be 1 space/unit or 96 residentialparking spaces.

Section 5.2(12)(g) of the Zoning By-law allows parking reductions for specific scenarios,including mixed-use buildings, proximity to transit, and affordable housing (only oneparking reduction may be applied to a site). The proposed development is located within1 50 metres of a street where transit service operates, which would permit a 1 0% reductionin the parking requirement. The greater reduction is applied to affordable housingdevelopments, where 60% of the required parking may be reduced, subject to following:

0 A) An area of land shall be provided on the site equal to the area required for theparking lot containing the reduced amount of parking stalls;

0 B) The area of land provided shall be landscaped area in addition to the minimumlandscaped area requirement of the zone; and,

0 C) the area of land provided shall be located in a manner contiguous to the parkinglot being provided or in a location suitable to provide the required parking incompliance with the requirements of Section 5.2(12).

In staff’s opinion, the proposed development meets the intent of the above criteria witheach residential block including a central shared greenspace along with a communitygarden across from the residential parking area in the middle of the site.

While the proposed development has a parking reduction of 65%, staff are of the opinionthat the parking being provided exceeds the anticipated demand and should additionalparking be necessary, there is excess commercial parking and there is additional landavailable to the north of the current concept.

For the social enterprise centre, 43 commercial/industrial parking spaces are proposed.Under Section 5 of the Zoning By-law, there would be a different parking rate for theproposed restaurant/cafe (1 space/5 seats) and light manufacturing use (1 space/200square metres nfa), and the remaining floor area would have a rate of 2.75 spaces per100 square metres of net floor area. Accordingly, the required commercial/industrialspaces would be 15 for the restaurant/café, 3 for the light manufacturing use, and 17spaces for the remaining floor area, for a total of 35 parking spaces.

Recognizing that the proposed social enterprise centre is conceptual at this point in time,the Applicant has provided parking beyond what is required under the Zoning By-law. Toprovide a more simplified parking calculation, a parking rate of 3.5 spaces per 100 squaremetres of net floor area would be applied to the social enterprise centre, resulting in thesame minimum 35 parking spaces.

Bicycle Parking

• Bicycle parking will be an important aspect of the proposed development with biking beinganticipated as the primary means of transportation. The Applicant has noted that eachmicro-home would be equipped with its own bicycle parking and lock.

• The social enterprise centre would also be equipped with a total of 20 bicycle parkingspaces, 12 at the rear intended for the community members and their guests and 8 at thefront entrance for customers and visitors of the café or retail store.

. Section 5.2(13) of the Zoning By-law would require a minimum of 0.3 bicycle parkingspaces per dwelling unit and 7% of the number of vehicular parking spaces required fornon-residential uses. This would translate to 29 bicycle parking spaces for residential usesand 3 bicycle parking spaces for non-residential uses. The Applicant has gone above andbeyond the requirements of the Zoning By-law for bicycle parking and recognizes itsimportance to the development. Given the importance of bicycle parking for the proposeddevelopment, the increased bicycle parking rate has been reflected in the above zonestandards.

Landscaping

. An essential feature of the 12 Neighbours design is the shared greenspace on eachresidential block. The shared greenspace takes cues from the newly implemented clusterhousing standards in the Zoning By-law. The greenscape provides 45 square metres permicro-home on each block, has no dimension less than 9 metres and is centrally locatedon each block in a contiguous area. The shared greenspace would include picnic tables,fire pit, privacy trees and landscaped open space.

. The development also includes a community garden as part of Phase 2 that is centrallylocated across from one of the parking areas.

. Recognizing that the lands abut existing and potential commercial development, themicro-homes have been setback a minimum 3 metres from either side yard. Within this 3metre setback a landscape buffer shall be provided for additional screening fromcommercial development.

Site Layout

. Recognizing the unique site characteristics and innovative housing form, staff are of theopinion that there are opportunities to vary the proposed site layout as shown on Map II,particularly beyond phase 2, to provide a more organic and diverse communityarrangement. Staff will work with the Applicant to explore further refinements to the sitelayout.

Development Agreement

. A Development Agreement between the Applicant and City will address the above notedzone standards along with the proposed micro-home and social enterprise centre uses.

. With respect to the proposed uses, the Development Agreement would further define andpermit the micro-home buildings and only permit the light manufacturing use for theconstruction of micro-homes related to 12 Neighbours Community Inc.

• All uses in the CDD zone shall comply with standards established in terms and conditionsset out in accordance with the amending By-law and Section 59 Development Agreementapproved by Council.

Access and Servicing

• Municipal services for this development are available on Two Nations Crossing and at theintersection with Smart Centres Way. The development is permitted to connect to theseservices; no extension of services in Smart Centres Way is required by the Applicant.

!wJed6upInqoeounss!eqoJ0!JdJe3!QluewdoIeAoQoi1oUO!13S!TSeiuo6U!NJdepAoqDU6uiqJn3/6u!Ad6u!Jd‘soiA!uew.ioopnouowwoo‘siiep6U!UIdqniqspueei6ulMoqspop!AoJdequid6u!jJdpuod3spuiiuv(a

/L9fdOpeqoeIAUEAsdjLflIMeoupJo3oU!Aiioua6eqaiueespdioue!oosoqiotu6sep6uippnq8U!d(p

uewdojeAoQeqoUOi13S!1S8O/L9FdOpOq38AlPUIllsdfl!M83UpJO338U!Aiieieue6aqsewoq-oioweqioU6!SOp6uipinqlEu!d(o

oodsA!U8W8LJsoqes‘6U!d3SpUEl‘N6!e6uipinq‘6upjd‘ozis!Ufl6uifleMp‘A1!suepsseippo‘luewdoloAeQ)

6U!UUld0.IoloeJ!Gsuo3!JopeJOAIQeqig!MUO!1lflSUO3U!peideid‘14!DOLqMuaweai6UewdoleAoG69uo!pooU!Jeuao:isoai6U3!lddkfeq(q

Ja3!QUowdoloAaGaqOUO!3S!1SeqO[/L9Hd01peqoIllIIsdeqMeopioooU!AllJeUe6podoloAepeqoisoqj(

:suo!!puoopUswia6UiMOllOeqopeqnspeAoJddEoqsesn6UUflpflUeW

N6!lPU‘83!4O‘le!3J8WW03epnloU!PIflOMq3LM‘eiueoes!JdJoualE!30SPUA!UflWWO3ewoq-0J3!WolqpJojE1!Ufl961!w.Iodo(jcj)13!JS!GlUowdoleAoGaAlsueqaidwoQo(dii)ew.ioje6iil!1oHwoi6U!SSOJQSUO!1NOM!69OUOE[iOdeuozeiojUO!1pUflodAl!Wduniqeeqoqoquo3U1A1!UflWW00sJnoqq6!eAqpo4iwqnsuo!o!lddoqpapuewwooeiS!u

:NOl1VN3O33H

dINMSaigAqpau!wJaapeqll!Mpuodeqou6isappu8Z!Seq.ioAaMoq‘6u!ssoiQSUO!NOM!OUeo1ppUOduonuawiospesodoidseLlU3!lddVaqjU8lfl5UO3popnbAqpaiedoidoqo!°lOlflOuo!nueeJ8MWJ0j5PU6U!pJ6ojiounoooo(dv’iMs)UldU8WO6UNJeWJOv

Ajedojdl!1aiueoqOU!04n0JqM‘6U!SsOJ3SUo!ENOM!UOsoiodo!SUJA!DPeJ!flbOJ!PUIlUO!!PPCUicei,ON6!A1!D6U!s!xeaigUWfl!MpepnisooeqUOl!J1S!q!eoise!looeeiissAJes6u!3aUuooAllflUOA8‘6U!SSOJQSUO!NCM!Oep!sIflJOU01flUO!Jjesn-Elnw3flJSUO3oUeldosie!oJoL1!SUJJMJOUoq04UaWdOlOAapU8MaqjllsU!ll!MA!DoqAeMsOjEjuoD0apissooquoeJesn-nwo,qos!u8Idwe6UOlOqJ•

Ue3!lddVaqAqpeu!UiwPUpaiedoeqjl!MPUeApdeqll!MseUlu.eu!PUAMeAuG.SUJ8OUOOCUSL1UO!1O!lddS!qlpeMeAeJsqJeeu!6U!J4Jeq1!UJJMsewAoAU8M‘SlU!s3!J41ennjopeU6!sep!Uo!pesJeU!S!tfl6U!SSOJQSUO!NOMjIB!MS3OUUO3AeMseiiueoiew6U!SS0J0sUO!NOMjOiOUAeMS8JUOQIJEWSoUODJOdpnqiineqojOU‘(6Urjs!xeq6UeseiewoAleew!xoJdd)AIUOMseUeQwsoUoIJodnqeq!Aeqll!MUewdoleAepeqosseooAEMeAUG

U3!IddVeqoAIiIqlsUodseJeqeqll!MkiedojdUewdoleAepeqUCseoiiuesld!o!UnweqOe3UUeU!w

UO!eJedQieewieteqsioweAeidMOI3esnoqoj4esA!QoeqisseooeinpnispeeqelleSU!opei!flbeieqll!MUO!lddVeqeAUdeqll!MUeWdOleAepeqUiqiMse3AJeSpU‘wesAsd!3iUnweqoUO3UUO3euoeqll!Meieq

f) Servicing, lot grading plan and storm water management plan are to be provided to thesatisfaction of the Director of Engineering & Operations at time of building permitapplication. Record drawings will be required following construction;

g) Access is limited to the built portion of Smart Centres Way only; and,

h) All municipal services and lanes in the development will be private, with operation andmaintenance being the responsibility of the Applicant.

Prepared by: Approved by:

Fredrick Van Rooyen, MCIP, RPP Marcello Battilana, MCIPPlanner, Community Planning Manager, Community Planning

NATIONS

FrederictnCommunity PlanningPlanification urbaine

Subject Property /122221 Propriété Visé

I I Area to be rezoned II___i Secteur a rezoner

Rezone a portion of PID 01533298 from RLF to CDD toaccommodate the development of a 96 unit micro-homecommunity and social enterprise centre with commercial (café!retail store), office, and light manufacturing (construction of micro-homes) uses. Demande visant a faire rezoner une partie du NID01533298 de RLF (zone de magasins de detail a grande surface) aCDD (zone d’aménagement intégrée) afin de permettrel’aménagement d’un centre d’entreprise sociale et communautairede 96 micromaisons, comportant des usages de naturecommerciale(café/magasin de detail), de bureau et d’industrielégère (construction de micro-habitations).

Map\carte#IFile \ fiche: PR-67-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: passage 269 Two Nations Cros

12 Neighbours Community Inc.

Frederictn

U)

0

N0N>0zcc0cc0

0

ccU)

C

EE0

C)cc

0

cczN

Site Plan I Plan Du SiteMap\carte#IIFile \ fiche: PR-67-2021Date \ date: septembre \ September 15, 2021

Community Planning Subject \ sujet: passage 269 Two Nations CrossinçPlanification urbaine 12 Neighbours Community Inc.

— 9MarceiLeBrun

Rezone a portion of IID 01533298from RLF to CD[) to accommodatethe development of a 96 unit microhome community’ and socialenterprise centre with commercial(café/retail store), office, and lightmanufacturing (construction ofmicro-homes) uses.

Demande vsant a faire rezoner unepartie du NID 01533298 de RLF(zone de magasins de detail agrande surface) a CDD (zoned’aménagement intégrée) afin depermettre l’aménagement d’uncentre d’entreprise sociale etcommunautaire de 96 micromaisons,comportant des usages de naturecomrnerciaie(calé/magasin dedetail), de bureau et d’industrielégère (construction de micro-habitations).

6C)

Northwest / Nord-Ouest

North I Nord

Frederictn

Conceptual I ConcertuelMap\carte#IIIFile \ fiche: PR-67-2021Date \ date: septembre \ September 15, 2021

Community Planning Subject \ sujet: passage 269 Two Nations CrossingPlanification urbaine 12 Neighbours Community Inc.

do Marcel LeBrun

METAL ROC

Frederictc,nCommunity PlanningPlanification urbaine

Map carte # IVFile \ fiche: PR-67-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: passage 269 Two Nations Crossing

12 Neighbours Community Inc.do Marcel LeBrun

VINYL SD1NG

Front I Avant Left I Gauche

W4YL DING

, METAL ROOF/

j--—— V1NYLSNG

I9NYLSNG

B H B N W N B W N

Rear I Arrière Right I Droite

Floor Plan I Plan d’étage

Elevations and Floor Plan I Elevations et Plan d’étacie

Southwest I Sud-Ouest

Elevations - Social enterDrise centre I Elevations - Centre d’entrenrises sociales

FrederictGnCommunity PlanningPlanification urbaine

Map carte # VFile \ fiche: PR-67-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: passage 269 Two Nations Crossing

12 Neighbours Community Inc.do Marcel LeBrun

Floor Plans - Social enterDrise centre I Plan d’étaae - Centre d’entreDrises sociales

Frederict€nCommunity PlanningPlanification urbaine

Map \ carte # VIFile \ fiche: PR-67-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: passage 269 Two Nations Crossinç

12 Neighbours Community Inc.do Marcel LeBrun

III iiti IL

IEI i1rn iii

INNOVATION SOCIALE. DE LA REGION DEGREATER FREDERICTON

FREDERICTONSOCIAL INNOVATION

September 7, 2021

City of Fredericton

Planning Advisory Committee

397 Queen St

Fredericton, NB

E3B 1B5

Dear Planning Advisory Committee:

Greater Fredericton Social Innovation (GFSI) purpose is to relieve poverty and benefit the community of

Greater Fredericton by providing social planning to advance comprehensive community strategies

guided by research, analysis and community defined goals.

I am writing to extend our enthusiastic support of the proposed innovative project, 12 Neighbours

Community Inc. to be located at Two Nations Crossing. Adequate housing as defined under

international law, is “the right of every woman, man, youth and child to gain and sustain a safe and

secure home and community in which to live in peace and dignity.” It is our hope the great work being

done by community organizations, citizens, Mayor and Council will continue to support housing for

those in the circumstance of poverty.

Sincerely,

Sandi MacKinnon

Executive Director

Greater Fredericton Social Innovation

(506) 471 - 4374

[email protected]

P0 Box 30069 Fredericton. NB E3B 0H8 www.SociallnnovationFredericton.com

FAQ - The 12 Neighbours CommunityA Micro-Home Community and Social Enterprise Center

What is it?12 Neighbours Community Inc., is a non-profitthat will build and operate a dignified micro-homecommunity of 96 detached units, based on housing-first principles, and a social enterprisecenter.

Based on “Housing First” principles, which have been embraced by all levels of government inCanada, 12N will go beyond just providing housing, to also tap into the power of community andmicro-enterprises (training businesses) to help people overcome barriers to employment andachieve their goals.

What is our ‘Why” - the organization’s Vision?The 12N Vision is to create a dignified micro-home community that provides a safe space toheal, to pursue opportunities, and to go after your best self. We believe everyone deserves ahome and a community where they feel safe and belong. Through the social enterprises, we willprovide community members with opportunities to learn new skills, develop confidence andgenerate some income.

Where is it?The proposed location is at the corner of Smart Centers Way and Two Nations Crossing (269Two Nations Crossing). It is walking distance to Walmart and other businesses in Smart CentersFredericton North.

What need are we addressing?It is well known that Fredericton has a growing population of vulnerable individuals whoare housing insecure - from seniors, to young adults, to single mothers, and alsonon-elderly singles (NES), the group most likely to be living in “deep poverty”. A UNBstudy, “Deep Poverty in New Brunswick” published by Dr. Daniel J. Dutton found that43-50% of people living in “deep poverty” (incomes below 50% of the Low-IncomeMeasure, a relative measure ofthe poverty line in NB) lived in Fredericton and similartowns under lOOK people. According to the province’s 2019-2022 New BrunswickAction Plan, there has been a 70% increase in the number of non-elderly singles (N ES)on the province’s subsidized housing waitlist in the past 1 0 years. As of March 31 , 2018,there were 414 non-elderly singles on the rental waitlist in Fredericton, and 122 seniors.In 2015, when the city announced its “Road Home” plan to end chronic homelessness,there were 70 people on a “by-names list”. In 2021 the list has grown to over 150people. COVID has highlighted the vulnerability of housing insecure individuals. The hothousing market has made it even more difficult to find affordable housing options. Weneed housing, but we need more than just housing.

What is the Social Enterprise Center?The Social Enterprise Center will be a key support system and catalyst for personal andcommunity development. Social enterprises are businesses that are primarily purpose-based,more than profit-based. The social enterprise center will initially host three micro-businesses,which will be “training businesses” designed to help people develop work skills in three areas:food services, retail and construction. The social enterprise will have a cafe, an art and retailstore, and a micro-home factory. These businesses will provide training and employmentopportunities for community members.

The social enterprise center will also provide meeting spaces for other community supportprograms and organizations that will be made available to community members.

Who is it?12 Neighbours Community Inc., was founded by Marcel LeBrun. Marcel became a Frederictonresident over 30 years ago when he attended UNB engineering and has worked as a softwareentrepreneur in the region since the 1990s. Most recently, Marcel was CEO of Radian6, andSenior Vice-President at Salesforce.com. In the past 5 years Marcel has been studying modelsof urban poverty relief and development and getting involved in justice issues and social impactinitiatives. 12N intends to embody the best principles from these models. 12 NeighboursCommunity Inc. has a three person Board with Marcel LeBrun, Sue MacQuarrie (financialconsultant in Fredericton), and Dr. Peter Lee (Structural engineer in Fredericton). Theorganization also has a larger advisory board (see below).

When is it happening?I 2N has already acquired land in Fredericton for this project at 269 Two Nations Crossing. 1 2Nis currently in the process of seeking re-zoning approval from the City of Fredericton and hasbegun the engineering design phase. If approved, 12N will then enter into a developmentagreement with the city and obtain a building permit with the goal of beginning development assoon as possible in the fall of 2021.

1 2 Neighbours is also aiming to start the construction of micro-homes this fall, 2021 , and willattempt to get some people in homes this winter 2021/22, provided that there are no unforeseendelays. 12N expects to build the social enterprise center next summer 2022, as well as anadditional 24 homes in 2022/23. A total of 96-homes will be built over 4 years.

How is it funded?The land has been acquired by The LeBrun Family Foundation, a registered charity/foundationled by Marcel and his wife Sheila. The Lebrun family will also provide initial funding for thisproject. We will also be seeking additional funding sources and community partners as wewelcome the participation of businesses, nonprofits and government. 12 Neighbours is indiscussions with the province and is anticipating being part of the provincial AHRP program(Affordable Housing Rental Program) and is working with Social Development toward this end.This would provide 12 Neighbours with capital grants for construction of the micro-homes and itwould provide qualifying community members with rent subsidies. 12 Neighbours will also

welcome community partners who are interested in contributing in-kind services and in-kindgoods/products or discounts to the community. 12 Neighbours is not requesting funding from theCity of Fredericton.

How will it operate?The 12 Neighbours Community is more than just housing. It will be a managed community, withfull-time community managers and 24/7 staff supports. The social enterprise center will be opento the public and will provide an engagement point for Fredericton residents to get familiar withour community, to support the work, volunteer, or just enjoy the cafe.

What are the micro-homes like?The micro-homes are fully independent, private detached homes with a small private yard,arranged in neighbourhood blocks of 12 homes (“12 Neighbours”) with ample shared communitygreen space in between them. Each home is 1O’x24’ and has a covered front deck, athree-piece bathroom, a kitchen with sink, induction stovetop, microwave, apartment sizedfridge, and sleeping accommodations for one or two people, and a living and dining area, plus astorage loft and cathedral ceiling. The homes are built to the province’s “Green Building”standard and are very energy efficient. The homes will be connected to city water and sewer.

How will community members be selected?I 2 Neighbours expects to work with Social Development, other housing agencies and non profitsin the city, as well as existing community members, to collaborate on the selection of newcommunity members who are in need of housing and who are the best fit for this community.Social Development currently manages a waitlist for affordable housing as well as a by-nameslist of people with housing needs. If anyone is interested in staying informed about when we willbegin to process applications, please sign up for our newsletter on the website atwww.12neighbours.com, or send us an email at info12neighbours.com

How will 12 Neighbours work with existing experts, nonprofits and housingorganizations?I 2 Neighbours is adding capacity in Fredericton to augment the great work being done byexisting organizations, adding new capacity in the housing continuum. We will collaborate andcomplement the work of these nonprofits including the Fredericton Homeless Shelters, TheJohn Howard Society, Youth in Transition, Riverstone Recovery Center (and the PhoenixLearning Center), The Downtown Health Clinic, Under One Sky, New Brunswick SocialDevelopment, and more.

The 12 Neighbours Advisory Board includes:- Sandi MacKinnon, Executive Director, Greater Fredericton Social innovation- Misty McLaughlin, Executive Director, Youth in Transition- Jason Hickey, Phd, CIHR Indigenous Research Chair, Associate Professor and

Researcher, School of Nursing UNB- Dr. Sara Davidson, Executive Director, Riverstone Recovery Center.- John Barrow, Executive Director, John Howard Society

Warren Maddox, Executive Director, Fredericton Homeless SheltersDr. Dan Dutton, Phd, Department of Community Health and Epidemiology at DalhousieMedical, and Visiting Research Scientist, Horizon Health Network.Marcel LeBrun, Chair/founder of 12 Neighbours Community.

How can I help, get involved?You can reach out to 12 Neighbours directly at info12neighbours.com

Where can I get more information?Please check the 12 Neighbours Community website for more information athttp://www.12neighbours.com or email us at infol2neighbours.com

PLANNING REPORT

- PAC — September 15, 2021re eric en File No. : Z-32-2 1, V- 1 7-2 1, P. R. No. 68/21

To: Planning Advisory Committee

From: Fredrick Van Rooyen, Planner

Proposal: Rezoning and variance to accommodate the creation of one commercial lot andrecognize the existing retail store floor area

Property: 1040 Prospect Street (PID 75418822)

OWNER: Crombie Development Limited2000 Barrington Street, Suite 1210Halifax, NS, B3K 3K1

APPLICANT: WSP Canada Inc. do Randy Hollett1 070 St. George Boulevard, Suite 160Moncton, NB, El E 4K7

SITE INFORMATION:

Location: South side of Prospect Street, between the Hilltop Maritime Tavern and theeastern portion of the Uptown Centre

Context: Commercial area along Prospect Street

Ward No: 9

Municipal Plan: Commercial Centres and Corridors

Zoning: Regional Commercial Zone (RC)

Existing Land Use: retail store, food service take-out, drive-thru facility

Previous Applications: P.R. 107/05, P.R. 97/06, P.R. 48/14

EXECUTIVE SUMMARY:

The Applicant is seeking to create one new commercial lot from the existing Uptown Centre to allowfor the sale of the Prospect Street Plaza, currently tenanted by Shoppers Drug Mart and Starbucks.With the existing zoning being Regional Commercial, the proposed lot is exceedingly undersizedand does not meet the intent of the RC Zone. Accordingly, rezoning to the COR-2 zone brings theproposed lot into conformity with the Zoning By-law and Municipal Plan.

The Applicant is also requesting an 86 square metre floor area variance to recognize the existinggross floor area of the retail store (Shoppers Drug Mart). In staff’s opinion, the proposed variance isminor in nature and does not create any adverse impact as it recognizes an existing condition.

The plan of subdivision to create one new commercial lot is exempt from the tentative plan processand Council approval as the proposed lot has an existing main building, the plan does not involve

the laying of public or future streets and does not require setting aside land for public purposes. Staffsupport the application subject to terms and conditions.

APPLICATION:

wSP Canada Inc., on behalf of Crombie Development Limited, has made an application at 1040Prospect Street (Prospect Street Plaza) for the following:

. Rezone a portion of PID 75418822 from RC to COR-2 to accommodate the creation ofone commercial lot; and

. 86 square metre floor area variance to recognize the existing retail store floor area(Shoppers Drug Mart).

PLANNING COMMENTS:

Proposal:

. The rezoning from RC to COR-2 for a portion of PID 7541 8822 as shown on Map I isbeing requested to accommodate the creation of one new commercial lot from the existingUptown Centre, as it is exceedingly undersized for the existing RC zone.

. The Owner is seeking to subdivide this portion of the property to allow for the sale of theProspect Street Plaza, currently tenanted by Shoppers Drug Mart and Starbucks.

. The Prospect Street Plaza and the Uptown Centre share a signalized driveway accessand cross access, functioning as an integrated development. Accordingly, the plan ofsubdivision will include a right-of-way in favour of the proposed lot along with a sharedaccess and easement agreement as shown on Map III.

. The proposed 86 square metre floor area variance is solely to recognize the existing retailstore floor area (Shoppers Drug Mart). While the existing retail store floor area would beconsidered legal non-conforming under the COR-2 zone, the Applicant is seeking thevariance to provide assurances and certainty for any future owner and their respectivelenders, insurers, and tenant(s) that in the unlikely event of damage or destruction to theexisting building, the building could be rebuilt to its existing building area, including the1 ,866 square metres of retail space.

Municipal Plan:

. The property is within the Commercial Centres and Corridors Designation in theMunicipal Plan.

. Section 2.2.1(30) provides a hierarchy of retail commercial classifications to beestablished through the Zoning By-law. The existing property is classified as RegionalCommercial, which is intended to be a shopping centre in excess of 25,000 squaremetres of gross leasable area.

• The proposed lot for the Prospect Street Plaza has a gross leasable area of 2,065square metres. By rezoning the property to the COR-2 zone and removing it from theRegional Commercial classification, the proposal is consistent with the CommercialCentres and Corridors Designation.

Zoning By-law:

The proposal complies with the standards of the RC zone as follows:

Standard Required Prospect Street Plaza Uptown CentreLotArea(min) 3ha O.83ha 7.67ha

Lot Frontage (mm) 120m 78.37m

_

635m

Floor Area: gross 25,000m2 2,065m2

_

22,480m2floor area of thebuilding (mm)

. As seen in the above table, the proposed lot for the Prospect Street Plaza would notcomply with the minimum lot area, lot frontage, and floor area under the existing RC zone.In staff’s opinions, these deficiencies are not minor and the proposed lot does not meetthe intent of the RC zone.

. The remanent lot for the Uptown Centre complies with the minimum lot area and lotfrontage and still meets the intent of the RC Zone. While the existing floor area of theUptown Centre is technically less than the minimum 25,000 square metres, this is anexisting condition that would be considered legal non-conforming. The minimum 25,000square metre gross floor area standard was designed for a typical mall configuration,whereas the Uptown Centre has evolved over the years into to a power centre model withindividual box style stores. The remanent lot for the Uptown Centre will still be able tofunction as a regional commercial shopping centre.

The proposed lot for the Prospect Street Plaza complies with the standards of the COR-2 zoneas follows:

Standard Required Prospect Street PlazaLot Area (mm) 1 ,000m2 8,374m2

Lot Frontage (mm) 24m 78.37m

Lot Depth (mm) 31m 103.49m

Floor Area: total gross floor 1 ,800m2 1 ,886m2area for retail stores (max)

. In comparing the standards of the various commercial zones, the COR-2 zone is the mostappropriate for the Prospect Street Plaza and would provide a logical continuation of theCOR-2 zone towards the west along Prospect Street.

. The COR-2 zone accommodates the existing commercial development, is generallycharacterized by buildings located far back from the street with parking surrounding thebuilding, and allows more than 1 main commercial building on the lot.

• The existing retail store (Shoppers Drug Mart) and food service take-out (Starbucks) arepermitted uses in the COR-2 zone. While a drive-thru facility is a conditional use in theCOR-2 zone, a conditional use variance was already approved (P.R.48/14) and theexisting drive-thru facility would be considered legal.

Variance

. While the existing retail store floor area of 1 ,886 square metres would be considered legalnon-conforming as it is existing, the Applicant has requested the variance to recognizethis condition.

. Under section 60(2) of the Community Planning Act, if at least half of a building thatcontains a legal non-conforming use is damaged, the building shall not be repaired,restored, or used except in conformity with the Zoning By-law, unless the advisorycommittee agrees otherwise (i.e., variance application). In the unlikely event that morethan half of the building is damaged, the owner would technically only be permitted toreconstruct the building to the permitted 1 ,800 square metres as outlined in the COR-2zone. By recognizing the existing retail store floor area now through this varianceapplication, it provides a level of certainly for any future owner and their respective lenders,insurers, and tenant(s).

. Staff are of the opinion that this variance is minor in nature as it solely recognizes theexisting condition. It should be noted that if an addition(s) or infill development wereproposed that included additional retail floor area, a future planning process would berequired.

Parking

. The parking requirements for both the Prospect Street Plaza and Uptown Centre can beaccommodated on their individual lots.

. The Applicant has provided a parking analysis based on the existing conditions:

0 Prospect Street Plaza: 73 parking spaces required; 95 parking spaces existing(including 3 barrier free parking spaces)

0 Uptown Centre: 787 parking spaces required; 972 parking spaces existing(including 44 barrier free parking spaces)

Plan of Subdivision

. The plan of subdivision to create one new commercial lot is exempt from the tentative planprocess and Council approval as the proposed lot has an existing main building, the plandoes not involve the laying of public or future streets and does not require setting asideland for public purposes.

. The plan of subdivision will include a right-of-way in favour ofthe proposed lot (Lot 21-33)along with a shared access and easement agreement over the existing mutual driveway.

• This would ensure that the Starbucks drive-thru queuing spaces are accommodatedappropriately and preserve the functionality of the overall Uptown Centre with the sharedsignalized driveway access and cross access. The two properties would continue tofunction in an integrated manner as it currently exists.

Engineering and Operations

• Engineering and Operations have no issues with the application.

RECOMMENDATION:

It is recommended that the application submitted by WSP Canada Inc., on behalf of CrombieDevelopment Limited, at 1 040 Prospect Street (Prospect Street Plaza) for the following:

. Rezone a portion of PID 75418822 from RC to COR-2 to accommodate the creation ofone commercial lot; and,

. 86 square metre floor area variance to recognize the existing retail store floor area(Shoppers Drug Mart),

be approved subject to the following terms and conditions:

a) A right-of-way in favour of the proposed lot (Lot 21-33) along with a shared access andeasement agreement be established generally in accordance with Map Ill attached to P.R.66/2 1 to the satisfaction of the Development Officer; and,

b) The 86 square metre floor area variance only apply to the existing retail store floor areaon the proposed lot (Lot 21-33).

Prepared by: Approved by:

L4I44

____

Fredrick Van Rooyen, MCIP, RPP Marcello Battilana, MCIPPlanner, Community Planning Manager, Community Planning

Subject Property I Propriété Visé— — —: ; Area to be rezoned I Secteur a rezoner— — — —

Rezone a portion of PID 75418822 from RC to COR-2 topermit the creation of one commercial lot. 86 m2 floor areavariance to recognize the existing retail store floor area(Shoppers Drug Mart). Modifier le zonage d’une partie duPID 75418822 de RC a COR-2 pour permettre Ia creationd’un lot commerciale. Derogation de surface de plancher de86 m2 nécessaire a reconnaltre l’aire de vente au detailexistante (Shoppers Drug Mart).

FrederictGnCommunity PlanningPlanification urbaine

File \ fiche: PR-68-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: rue 1040 Prospect Street

WSP Canada Inc.Holl

Site Plan IPlan Du Site

Frederictin

Community PlanningPlanification urbaine

Map carte IIFile \ fiche: PR-68-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: rue 1040 Prospect Street

WSP Canada Inc.do Randy Hollett

V

86 m2 floor area variance to recognizethe existing retail store floor area (Shoppers Drug Mart).Derogation de surface de plancher de 86 m2 nécessaire areconnaItre l’aire de vente au detail existante (Shoppers Drug Mart).

I:

z-4

(ir p,

rn

--——--

— 1

4 44 44

ri ±I

(1 gai ‘

6 4

w u. ,

4 6 4 44 6

rn

i.,.

6

___

----

.---

D •

1===UCE

Rezone a portion of PID 75418822 from RC to COR-2 to permit the creation of one commercial lot.Modifier le zonage d’une partie du PID 75418822 de RC a COR-2 pour permettre Ia creation d’un lotcommerciale.

Plan of Subdivision I Plan de lotissement.

Frederictc*nCommunity PlanningPlanification urbaine

Map carte # IIIFile \ fiche: PR-68-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: rue 1040 Prospect Street

WSP Canada Inc.do Randy Hollett

SUO!!pUO3puSWJOjOpOIqflS‘UO!3!Idd8S!14ioddnsJ4Sped!3!uoJspdwi0A!60UQupu88JS!qUIueidjuowdoeAep6u!ls!xoeqq!M6uidoejU!S!isodoideqspipusauozeqoiddeqqIMAIdwo3jueuwaipupesodoideqqoqpuU81dIed!o!unoqqMUe5!SUo3SIsodoideqieoid6u!s!xeOIflouO!JOdqiouequojouipjnqMOUeuoeeioouoisiAipqnsou8ideA!1ue6u!sodoidS!U3!IddVeqj

3AI1fl33X3

OL./09Hd‘OL.O-8-S:suo!eO!IddVsflO!AeJd

6U!IIOMppoqoEep816U!S:esflpu6u!six3

a-H)euouoIuep!soH:6u!uo

spooqJnoqL6IoNpeqs!qrns3:ucJId!3!un

:o\JPJM

eJlUep!SoJOS!JM07:xOuoQ

pojqnpuOUWU3UflGO.10UJ031S8MflO:uOoOi

:NOl1Vi,jONI3JJS

eoqsv:INV3I1ddV

£SL939N‘uopuopeideuuouna

________

P!9uei>jPU8We!II!M:H3NMO

(LosLOSLOaid)eue,ueouna9:AIJadoJd

uipjinq[-JMOUOUOOOJ3OuoiSIAipqnsOujdaA!uo1:IsodoJd

Jeuucj‘UOAOOJUANoupeid:woij

OOB!WWOQAJos!Apy6u!uu8ld:oi

L’/99°NYdL‘O&-9L-s°NelidL’O’‘9Lieqwejde—OVd-

!HOd3HONINNY1d

APPLICATION

William and Karen BErd have made an application on property located at 28 Duncan Lane for atentative plan of subdivision to create one new R-1 building lot on the north portion of the existingparcel.

PLANNING COMMENTS:

Background:

. A previous tentative plan of subdivision (S-28-201 0, P.R. 60/1 0) was approved by Councilin 2010 and subsequently re-approved in 2011 as the 12-month timeframe to register thefinal plan of subdivision had lapsed.

. Since the re-approval in 201 1 , the property has sold and the final plan of subdivision wasnever registered. Consequently, payment of the 8% land dedication never occurred.

. The original tentative plan of subdivision did not span the entire length of Golf Club Road,and the current application is seeking a larger lot that spans the entire length of Golf ClubRoad.

Proposal:

. The Applicant is seeking a tentative plan of subdivision to create one 2,793 square metrelot (Lot 21 -34) on the north portion of the existing parcel as shown on Map II. The Applicantintends to sell the remanent lot and construct a new single detached dwelling on theproposed lot in the future. There are currently no plans for the location of the singledetached dwelling on the proposed lot, but it would be subject to the R-1 zone standards.

. Both the proposed and remanent lot comply with the minimum lot requirements of theR-1 zone. The proposal will not result in any deficiencies for the existing single detacheddwelling on the remanent lot.

. The 8% public land dedication is applicable for the proposed lot and is recommended tobe taken in the form of cash.

Municipal Plan:

. The proposal is consistent with the Established Neighbourhoods Designation of theMunicipal Plan. The proposal is in keeping with Section 2.2.1(1 8)(vii) as newdevelopment will be compatible with adjacent properties and Section 2.2.1(21)(i) as theproposed lot is consistent with the lot pattern of the neighbourhood.

• Both the remanent and proposed lot are oversized, which is typical for properties to thesouth and west, and development on the proposed lot will be a single detached dwelling.

Zoning By-law:

The proposed and remanent lot comply with the standards of the R-1 zone as follows:

Standard Required Remanent Lot (Interior) Proposed Lot (Corner)Lot Area (mm) Interior Lot: 63Cm2 3574m2

Corner Lot: 720m2 2,793m2

Lot Frontage (mm) Interior Lot: 21 m 52792mCorner Lot: 24m 31 .744m

Lot Depth (mm) 30m 70969m 60.039m

. Approximately 1 ,250 square metres of the proposed lot has a grade that is sloped 1 5% ormore. As per Section 4.1(4) of Zoning By-law Z-5, this area is not considered part of thelot for the purposes of calculating minimum lot area. Accordingly, the proposed lot wouldhave an area of approximately 1 ,543 square metres, for the purposes of calculatingminimum lot area, which still exceeds the minimum 720 square metres. While portions ofthe proposed lot are steep, there is adequate space to accommodate the futuredevelopment of a single detached dwelling.

. Both the proposed and remanent lot comply with the minimum lot requirements. Theexisting single detached dwelling on the remanent lot complies with all other R-1 zonestandards, including setbacks. Future development of a single detached dwelling on theproposed lot will be subject to the R-1 zone standards.

Access, Servicing, and Widening:

. The right of way limits of the intersection of Duncan Lane and Golf Club Road do notconform to the actual travelled road and related infrastructure. There is no registereddocument transferring a parcel to the City for the portion of the travelled road that appearsto be partially on property of the Applicant, as approximately shown as the northeastcorner of the proposed new lot on the tentative subdivision plan.

. Engineering & Operations is requesting a parcel of land to be transferred to the City andadded to the right of way. The parcel is to be approximately 5 metres offset from thecurrent edge of asphalt and to include the shoulder, ditch and back slope.

. There is water and storm service, but no municipal sanitary sewer on the section of GolfClub Road on which the proposed lot fronts. Sanitary service to a building on the proposedlot will need to be connected to the mains on Duncan Lane. There will be an infrastructurefee owing to the City for the sanitary service, as per Subdivision By-law Z-4.

• The infrastructure fee is intended to compensate the City for a portion of the cost ofinstalling services on Duncan Lane. If water and storm services are connected to DuncanLane, they will also be subject to the infrastructure fee. There are no infrastructure feesfor connection to the water and storm service on Golf Club Road.

• The Traffic Engineer has requested that a new driveway access be to Golf Club Road andnot to Duncan Lane due to sight line distances and the grade of Duncan Lane.

RECOMMENDATIOIt

It is recommended that the application submitted by William & Karen Bird for a tentative plan ofsubdivision on property located at 28 Duncan Lane to create one new R-1 building lot on the northportion of the existing parcel be forwarded to City Council with a recommendation that the publicland dedication be taken in the form of cash.

Additional Information

Pursuantto Section 75(1) ofthe Community Planning Act, the following terms and conditions willbe imposed on the subdivision by the Development Officer:

a) The final plan of subdivision be submitted substantially in accordance with Map II attached toPR 66/21 to the satisfaction of the Development Officer;

b) Access, servicing and lot grading to be provided to the satisfaction of the Director ofEngineering & Operations and provided at time of building permit application;

c) Infrastructure fee is to be determined and payable to the City at time of building permitapplication to the satisfaction of the Director of Engineering & Operations; and,

d) Applicant to work in good faith with Engineering & Operations to acquire additional area forthe right of way at the intersection of Duncan Lane and Golf Club Road.

Prepared by: Approved by:

Fredrick Van Rooyen, MCIP, RPP Marcello Battilana, MCIPPlanner, Community Planning Manager, Community Planning

______

Subject Property / Propriété Visé

Tentative plan of subdivision to create one new lot inthe R-1 zone.

Plan provisoire de lotissement a créer une parcelle danszone R-1.

FrederictnCommunity PlanningPlanification urbaine

Map\carte# IFile \ fiche: PR-66-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: 28 Duncan Lane

William & Karen Bird

— ——— -— ——-————-----*-

A.TE W!:e ct:ss

----------——-----------------

TABLE OF NB. CO—ORDINATE VALUES

-.———-----...*-

T AThC N(R1Hv:; r

[-zpvJ A c: RA)I1J •EAINc; )ISTANCE ... 69 2 48 798.c96 7 44C 155.579I— C1 ci I ii 34 ?!i.44.C” 9.990 /0 2 %4 S6t.2i I 4 162./5I— /1 ‘-8’ 8111)9 1 4. 41d2I___c1 :i.:4 )S.1i .S 4 1 -...-—--.-.- ‘2 7 44 51Z&’ I 4: ‘1.4.9

2C .— . ).3 2 $4 7 44C 21.4d9. 7 74 7 872.538 7 4d( 269.)66

— --— — ————— —..------- .--.----- C1 MCN24.i 2 48L 7 23D.918

----.-

LLLjE;tçj,40

,

oJ5,Do3.I.z::

1 c .z \

,.c,()

LOT 21—34,;.- ‘,

27 Ir

.

. VI‘•_)

I

,i! I7L: -.,

LAN 7777:

!•-1 26 1

):<;

;: r’1 ‘ Flat). wLUAI1 AIEXANflE I,)J / H, RAEI1 )AWN /!. / (DEED 3O8522O I •

& I FLAW 19O / J••••? I I

. I liii oi.:1Da1 I f :

I CIVIC 23 I / ! II I I II 74 Sq.r. •1’ q I I I

: ;-. .-.! ./ I ,/I I : I \1Q 1’

I I -k / .._ i 0>1t) 1I -. S “1 -

r%..icy)Fi .•j $ :

--. .. i• 1. u-/ , J\ CAA 1

- &I---.-. ,, ‘ .....

h.; • . I I ..J I LUT 1249 . ...—. . V

‘‘I:Lf4 / -•• I / Hi.... -.-4i -

V • / ?

II

.—. I •:

-.-S-.I .__1t) O1CC29 I s:;;.. C.j I

ISCALE 1:5U / I

7.1I525 iii -.--..--...---.-.

Tentative plan of subdivision I Plan Provisoirede lotissement.

Frederict€nCommunity PlanningPlanification urbaine

Map \ carte # IIFile \ fiche: PR-66-2021Date \ date: septembre \ September 15, 2021Subject \ sujet: 28 Duncan Lane

William & Karen Bird

Brown-Snook, Julie

From: Jerome Connors <[email protected]>Sent: Tuesday, September 7, 2021 8:33 PMTo: PLANNING AND DEVELOPMENTSubject: File PR-66-2021

Please find included comments opposing the tentative plan to subdivide to create an additional building lot re PID01501501.

The intersection of Gold Club Rd and Duncan Lane is already a dangerous intersection from several perspectives. Firstfrom a line of sight. During all seasons it is difficult to see on coming traffic, compounded by the need to cross a lane oftraffic due to the “Y” configuration.Secondly, during winter the road is often slippery and dangerous due to steep slopes.

Third, pedestrians are required to walk on the roadway through that intersection as no sidewalks or crosswalks arepresent, traffic often travels above speed limits, crowds the edge of roadway in taking the intersection and running ofstop signs by most traffic is a regular observation.

During the hearings at City Hall when the planning for St Anns Court was being considered, that intersection wasidentified by city officials as dangerous then even with less traffic and buildings surrounding it, the City identified adesire to dead-end Duncan Lane, closing that intersection and rerouting traffic thru Gay family property to the east. Asstated above, it is a much more busy area now and although over 20 years have passed no improvements have beenmade to address the issues. Adding an additional driveway to service a building lot as being considered would worsen analready bad situation.

Water and sewage services. It is my understanding that those services end at Duval Ct and no such service access wouldbe available to that lot. Please be advised that I have been asked by my father-in-law, Ronald Vaughan, to inform youthat any intention to run services through the property of 577 Golf Club Rd will be opposed by him as the currentproperty owner.

Sincerely

1

[ INSPECTION REPORT FOR July 2021

PERMITS VALUE VALUE OF CONST.YEAR TO DATE

SAME PERIODLAST YEAR

RESIDENTIALSINGLE UNITSNewAdditions

7 $1,935,000 $14,488,565$489,000

$11,204,000$254,000

2 UNIT DWELLINGSNewAdditions

2 $737,296 $3,863,296 $2,170,000

BASEMENT APTSNew $162,500

TOWNHOUSESNewAdditions

$5,485,000 $4,260,000

APARTMENT BLDG.NewAdditions

3 $12,959,500 $60,091,260$415,000

$31,335,200

ACCESSORY BLDGStorage BuildingCarport/GarageSwimming PoolDeck

$11,000$25,000$158,575

$5,000

$312,700$462,000$849,735$52,900

$188,794$451,000$495,128$299,346

RENOV/REPAIRS 35 $1,040,135 $6,601,378 $5,355,767

MINI HOMESNewAdditions

I $90,000 $297,000 $646,000

317I

TOTAL RESIDENTIAL $16,961,506 $93,570,334 $56,659,235

PERMITS VALUE VALUE OF CONST. SAME PERIODYEAR TO DATE LAST YEAR

COMMERCIALNew - - $3,085,000 $210,000Additions I $50,000 $50,000 $942,500Renov/Repairs 12 $2,246,996 $1 1 ,238,938 $1 I ,336,824

INDUSTRIALNew - $305,000Additions - -

Renov/Repairs - $207,000 -

GOVERN (Mun.)New -

Additions - -

Renov/Repairs - $546,613 $157,734

GOVERN (Fed/Prov)New - $2,559,000Additions - - - $212,000Renov/Repairs 4 $1,070,500 $22,933,350 $5,460,899

INSTITUTIONALNew - $500,000Additions - -

Renov/Repairs 5 $309,000 $762,772 $6,070,107

Others I $1,000 $1,000 -

DEMOLITION 2 - - -

TOTALS 85 $20,639,002 $134,954,007 $81,854,299DEMOLITIONS ($29,881,170 July 2020)

617 Brookside Drive - Single Detached Dwelling

623 Brookside Drive - Single Detached Dwelling

Jul-21NUMBER OF NEW DWELLING UNITS

July 2021 THIS YEAR July 2020 SAME PERIODTO DATE LAST YEAR

SINGLEUNITS 8 55 11 452UNITDWELLINGS 4 17 2 12BASEMENTAPARTMENTS o o iAPARTMENTUNITS 156 466 113 298TOWNHOUSE UNITS o 31 20 38TOTAL I 68 578 1 46 394

NUMBER OF PERMITS ISSUED

BUILDING PERMITS PLUMBING PERMITS SIGN PERMITS

July 2021 TO DATE July 2021 TO DATE July 2021 TO DATE85 635 34 251 6 51

FEES FOR BUILDING PERMITS ISSUEDSAME PERIOD

July 2021 TO DATE July 2020 LAST YEAR$164,682.00 $1,078,223.00 $237,796.50 $651,567.50

FEES FOR PLUMBING PERMITS ISSUEDSAME PERIOD

July 2021 TO DATE July 2020 LAST YEAR$14,320.00 $149,510.00 $30,340.00 $113,920.00

FEES FOR SIGN PERMITSSAME PERIOD

July 2021 TO DATE July 2020 LAST YEAR$600.00 $5,000.00 $200.00 $3,650.00

TOTAL FEES - BUILDINGIPLUMBINGISIGNSSAME PERIOD

July 2021 TO DATE July 2020 LAST YEAR$179,602.00 $1,232,733.00 $268,336.50 $769,137.50

SUBMITTEDBY:

_______________________

APPROVED BY:

______________________

Fre

deri

cten

Gro

wth

&C

om

munit

yS

erv

ices

Dep

artm

ent

Bui

ldin

gIn

spec

tion

sD

ivis

ion

397

Que

enSI

,P

.O.

Box

130

FR

ED

ER

ICT

ON

,N

BE

3B4Y

7P

hone

:46

0-20

29/

Fax:

460-

2126

Issu

edB

uild

ing

Per

mit

sS

ort

edby

Str

uct

ure

Typ

e

July

2021

Per

mit

#Is

sue

Dat

ePI

DP

roje

ctL

ocat

ion

App

lica

ntW

ard

Str

uct

ure

Typ

e:T

ype

ofP

erm

itW

ork:

Fee

Val

ueD

escr

ipti

on

2021

BP

0613

Jul-

12-2

101

4845

5955

Ran

kine

St

Ken

Squ

ires

War

d8

Acc

esor

yB

uild

ing

New

$16.

00$2

,000

.00

To

plac

ene

w8’

xlO

’sh

edin

rear

yard

ofSD

D.

2021

BP

0617

Jul-

22-2

175

4579

0341

Riv

erfr

ont

Way

Pau

lM

cDon

nell

War

d12

Acc

esor

yB

uild

ing

New

$32.

00$4

,000

.00

To

plac

ene

w12

’x

8’sh

edin

rear

yard

ofSD

Das

per

plan

ssu

bmit

ted.

2021

BP

0662

Jul-

28-2

175

5239

7710

1B

arcr

oft

Dr

Ale

xand

erB

agna

llW

ard

12A

cces

ory

Bui

ldin

gN

ew$4

0.00

$5,0

00.0

0C

onst

ruct

an8’

x12

shed

inth

ere

arya

rdof

SDD

aspe

rsi

tepl

ansu

bmit

ted

2021

BP

0612

Jul-

15-2

101

4439

5111

Car

leto

nSt

The

Cap

ital

War

d11

Acc

esso

ryB

uild

ing

New

$7.5

0T

opl

ace

40’

x12

0’sp

ecia

lev

ents

tent

July

16-1

7fo

rS

wel

teri

ngS

ongs

on$1

,000

.00

Cai

leto

nS

tree

tas

per

plan

ssu

bmit

ted.

2021

BP

0381

Jul-

02-2

175

4374

2621

4D

unns

Cro

ssin

gR

dB

&B

Inve

stm

ents

Ltd

War

d8

Apa

rtm

ent

Bui

ldin

gN

ew$2

8,00

0.00

$3,5

00,0

00.0

0T

oco

nstr

uct

new

16un

itap

artm

ent

build

ing

aspe

rpl

ans

subm

itte

d.

2021

BP

0382

Jul-

17-2

175

3890

7265

0W

ater

loo

Row

SDC

MC

onsu

ltin

gLt

d.W

ard

8A

part

men

tB

uild

ing

New

$70,

880.

00C

onst

ruct

phas

e2

(exc

ludi

ngfo

unda

tion

)fo

rne

w13

2-un

itap

artm

ent

build

ing

as$8

,859

,500

.00

per

plan

ssu

bmit

ted.

2021

BP

0442

Jul-

12-2

101

4389

1014

0A

rgyl

eS

tC

ases

Ren

ovat

ions

Ltd.

War

d10

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$8

0.00

To

repl

ace

8w

indo

ws

(2B

R)

onap

artm

ent

build

ing

aspe

rin

form

atio

n$9

,400

.00

subm

itte

d.

2021

BP

0444

Jul-

12-2

101

4470

0231

2S

aund

ers

StF

rede

ncto

nR

enta

lsLt

d.W

ard

10A

part

men

tB

uild

ing

Ren

ovat

ion

$80.

00‘“‘‘“

‘““

“‘“““

y‘‘“v

““

$10,

000.

00he

lica

lpi

les

and

post

sfo

rex

isti

ngre

arba

lcon

yan

dto

cons

truc

tne

wco

vere

d,

f‘frt

k,,i

,ii

,20

21B

P05

24Ju

l-09

-21

7547

4056

700

For

est

Hill

Rd

Kill

amA

part

men

tR

EIT

War

d8

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$3

20.0

0‘‘“‘“

““‘

“,I

$40,

000.

00re

plac

ein

teri

orfi

nish

esan

dad

dne

ww

ashe

ran

ddr

yer

aspe

rsc

ope

ofva

rk

2021

BP

0537

Jul-

13-2

175

0020

9710

2G

reen

fiel

dsD

rG

roun

dC

ontr

olP

rope

rty

Ser

vice

sW

ard

9A

part

men

tB

uild

ing

Ren

ovat

ion

$200

.00

Con

stw

ctin

teri

orre

nova

tion

and

add

new

was

her

and

drye

rto

unit

#2in

$25,

000.

00ex

isti

ngap

artm

ent

build

ing.

2021

BP

0540

Jul-

12-2

101

4229

6314

6H

ughe

sS

tS

heri

coD

evel

opm

ents

Lim

ited

War

d4

Apa

rtm

ent

Bui

ldin

gN

ew$4

,800

.00

$600

,000

.00

Con

stru

ctne

w8-

plex

aspe

rpl

ans

subm

itte

d

2021

BP

0607

Jul-

28-2

101

4751

7711

6W

ilse

yR

dG

roun

dC

ontr

olP

rope

rty

Ser

vice

sW

ard

7A

part

men

tB

uild

ing

Ren

ovat

ion

$400

.00

Con

stru

ctin

teri

orre

nova

tion

toun

its

#9an

d#1

6in

exis

ting

apar

tmen

tbu

ildin

g$5

0,00

0.00

aspe

rpl

ansu

bmit

ted.

2021

BP

0618

Jul-

20-2

175

5034

0915

5L

ian

StC

apit

alC

ityR

oofi

ng(2

007)

Ltd.

War

d9

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$7

52.0

0$9

4,00

0.00

To

repl

ace

asph

alt

shin

gles

onco

ndom

iniu

mbu

ildin

g.

2021

BP

0657

Jul-

26-2

175

4158

3651

Lia

nSt

Cas

eyB

utle

rR

oofi

ngLt

dW

ard

9A

part

men

tB

uild

ing

Ren

ovat

ion

$480

.00

$60,

000.

00T

ore

plac

eas

phal

tsh

ingl

eson

cond

omin

ium

build

ing.

2021

BP

0278

Jul-

05-2

101

5012

6149

5P

rosp

ect

StT

oss

Sol

utio

nsIn

c.W

ard

12C

omm

erci

alB

uild

ing

Ren

ovat

ion

$128

0.00

Con

stru

ctre

nova

tion

on3r

dfl

oor

tocr

eate

new

corr

idor

and

upgr

ade

bas

e$1

60,0

00.0

0bu

ildin

gw

ashr

oom

sin

com

mer

cial

build

ing.

2021

BP

0505

Jul-

14-2

101

4572

1750

5K

ing

StK

ing

Con

stru

ctio

nW

ard

11C

omm

erci

alB

uild

ing

Ren

ovat

ion

$7,2

00.0

0$9

00,0

00.0

0C

onst

ruct

reno

vati

onto

exis

ting

Ban

kof

Mon

trea

las

per

plan

ssu

bmit

ted.

2021

BP

0506

Jul-

05-2

175

4477

1412

5T

wo

Nat

ions

Cro

ssP

etro

ffP

artn

ersh

ipA

rchi

tect

sW

ard

4C

omm

erci

alB

uild

ing

Ren

ovat

ion

$440

.00

Con

stru

ctre

nova

tion

toin

stal

lac

cess

gat

esin

side

exis

ting

Wal

mar

tS

tore

as$5

5,00

0.00

per

info

rmat

ion

subm

itte

d.

2021

BP

0516

Jul-

22-2

101

4814

4912

41P

rosp

ect

St

Kin

gC

onst

ruct

ion

War

d9

Com

mer

cial

Bui

ldin

gR

enov

atio

n$6

,400

.00

$800

,000

00C

onst

ruct

reno

vati

onto

exis

ting

Ban

kof

Mon

trea

l(P

rosp

ect

Str

eet)

aspe

rpl

ans

subm

itte

d.

2021

BP

0551

Jul-

08-2

175

3628

305

Aco

rnSt

Mag

ine

Ath

leti

csIn

c.W

ard

9C

omm

erci

alB

uild

ing

Ren

ovat

ion

$200

.00

Con

stru

ctin

teri

orfi

t-up

for

new

Mag

ine

Ath

leti

csIn

cin

suit

e#4

ofco

mm

erci

al$2

5,00

0.00

build

ing

aspe

rpl

ans

subm

itte

d.

2021

BP

0556

Jul-

08-2

175

4030

5513

99R

egen

tS

tP

etro

ffP

artn

ersh

ipA

rchi

tect

sW

ard

9C

omm

erci

alB

uild

ing

Ren

ovat

ion

$440

.00

Con

stru

ctre

nova

tion

toin

stal

lac

cess

gat

esin

side

exis

ting

Wal

mar

tst

ore

(139

9$5

5,00

0.00

Reg

ent)

aspe

rin

form

atio

nsu

bmit

ted.

Pri

nted

8/4/

2021

2:17

:25

PMP

age

1of

1

2021

BP

0598

Jul-

30-2

175

4332

6811

11R

egen

tS

tC

asto

neC

onst

ruct

ion

War

d11

Com

mer

cial

Bui

ldin

gR

enov

atio

n$1440.0

0C

onst

ruct

inte

rior

fit-

upfo

rne

wB

arB

urri

tore

stau

rant

insu

ite

#10

(for

mer

$180

,000

.00

Sub

way

)as

per

plan

ssu

bmit

ted

2021

BP

0606

Jul-

14-2

160

1896

2837

0U

rquh

art

Cre

sL

ocks

tead

Eng

inee

ring

War

d7

Com

mer

cial

Bui

ldin

gA

dditi

on$4

00.0

0C

onst

ruct

24’

x60

addi

tion

onto

com

mer

cial

build

ing

(XL

Pla

ting

&M

achi

ning

)$5

0,00

0.00

aspe

rpl

ans

subm

itte

d.20

21B

P06

10Ju

l-08

-21

0146

2613

1015

Reg

ent

StM

aste

rA

ppli

cato

rs(1

996)

Ltd

War

d11

Com

mer

cial

Bui

ldin

gR

enov

atio

n$2

72.0

0C

onst

ruct

inte

rior

reno

vati

onto

expa

ndS

leep

The

rapy

Can

ada

into

suit

e#1

03$3

4,00

0.00

ongr

ound

floo

rof

exis

ting

com

mer

cial

build

ing

aspe

rpl

ansu

bmit

ted.

2021

BP

0615

Jul-

20-2

101

4784

3783

7P

rosp

ect

StM

PMC

onst

ruct

ion

Inc.

War

d9

Com

mer

cial

Bui

ldin

gR

enov

atio

n$2

4.00

$2,5

00.0

0T

ore

plac

eex

isti

ngco

ncre

tesi

gnbas

eas

per

info

rmat

ion

subm

itte

d

2021

BP

0642

Jul-

21-2

160

0002

0518

49L

inco

lnR

dQ

ualit

yR

oofi

ngLt

dW

ard

7C

omm

erci

alB

uild

ing

Ren

ovat

ion

$6

40

0$7

,177

.00

To

repl

ace

asph

alt

shin

gles

onca

rwas

hbu

ildin

g.

2021

BP

0643

Jul-

21-2

160

0002

0518

57L

inco

lnR

dQ

ualit

yR

oofi

ngLt

dW

ard

7C

omm

erci

alB

uild

ing

Ren

ovat

ion

$72.

00$8

,319

.00

Rep

lace

asph

alt

shin

gles

onco

mm

erci

albu

ildin

g.

2021

BP

0646

Jul-

26-2

175

3928

7830

Kno

wle

dge

Par

kD

rM

ecca

Cor

pora

tion

War

d8

Com

mer

cial

Bui

ldin

gR

enov

atio

n$1

60.0

0C

onst

ruct

inte

rior

fit-

upof

suit

e#2

10fo

rne

wH

Rof

fice

s(H

oriz

onH

ealt

h)in

$20,

000.

00fo

rmer

“Mar

ketw

ired

”sp

ace

aspe

rpl

ans

subm

itte

d.

2021

BP

0600

Jul-

09-2

101

4766

2123

2M

cKee

nSt

Ste

phen

Ban

ksW

ard

4D

eck

New

$40.

00T

ore

plac

eex

isti

ngre

arya

rdde

ckw

ithne

w12

x26

’de

ckon

SDD

aspe

rpl

ans

$5,0

00.0

0su

bmit

ted.

2021

BP

0638

Jul-

23-2

175

3806

6733

Reg

imen

tC

reek

Ave

Dan

iel

Muz

eyW

ard

1D

etac

hed

Gar

age

New

$200

.00

To

cons

truc

tne

w15

x22

’de

tach

edga

rage

insi

deya

rdof

SDD

aspe

rpl

ans

$25,

000.

00su

bmit

ted.

2021

BP

0575

Jul-

22-2

101

4389

1013

8A

rgyl

eS

tC

ases

Ren

ovat

ions

Ltd.

War

d10

Dup

lex

Ren

ovat

ion

$864

.00

$108

,000

.00

Con

stw

ctre

nova

tion

todu

plex

aspe

rin

form

atio

nsu

bmit

ted.

2021

BP

0624

Jul-

30-2

101

4431

2625

5A

rgyl

eS

tF

ranc

esP

ears

onW

ard

10D

uple

xR

enov

atio

n$2

4.00

To

repl

ace

port

ion

ofbe

am,

porc

hfl

oor

and

bott

omcl

addi

ngon

fron

tpo

rch

of$3

,000

.00

dupl

exas

per

info

rmat

ion

subm

itte

d.

2021

BP

0601

Jul-

21-2

101

4581

0896

Sai

ntJo

hnSt

Kin

gC

onst

ruct

ion

War

d11

Fed

eral

/Pro

vinc

ial

Ren

ovat

ion

$368

.00

“““)“

$45,

200.

00D

epar

tmen

tal

Bui

ldin

gan

dco

nstr

uct

upgr

ades

toel

ectr

ical

room

incl

udin

gne

w

2021

BP

0614

Jul-

12-2

101

4215

2832

4Fu

lton

Ave

Nor

thw

est

Roo

fers

Ltd.

War

d3

Fed

eral

/Pro

vinc

ial

Ren

ovat

ion

$1,8

72.0

0$2

33,3

00.0

0T

ore

plac

ero

ofin

gon

Nas

hwaa

ksis

Mid

dle

Sch

ool

aspe

rpl

ans

subm

itte

d.

2021

BP

0637

Jul-

30-2

101

4581

0870

6Q

ueen

StK

ing

Con

stru

ctio

nW

ard

11F

eder

al/P

rovi

ncia

lR

enov

atio

n$4

,792

.00

To

repl

ace

apo

rtio

nof

exte

rior

win

dow

sat

the

NB

Leg

isla

tive

Bui

ldin

gas

per

$599

,000

.00

info

rmat

ion

subm

itte

d.

2021

BP

0640

Jul-

30-2

101

5533

7920

McG

loin

StW

all

Con

stru

ctio

nS

ervi

ces

War

d5

Fed

eral

/Pro

vinc

ial

Ren

ovat

ion

$154

4.00

Con

stru

ctin

teri

orre

nova

tion

tom

ale

and

fem

ale

was

hroo

ms

onse

cond

leve

lof

$193

,000

.00

Mar

ysvi

lleP

lace

aspe

rpl

ans

subm

itte

d.

2021

BP

0513

Jul-

08-2

101

4475

9824

5W

estm

orla

ndSt

Atla

ntic

Bri

ckan

dS

tone

War

d10

Inst

itut

iona

lR

enov

atio

n$9

6.00

$12,

000.

00C

onst

ruct

reno

vati

onto

re-f

inis

hco

ncre

tech

urch

stee

ple

faca

des.

2021

BP

0580

Jul-

13-2

175

5375

7112

16R

egen

tSI

John

How

ard

Soc

iety

ofF

rede

hcto

nW

ard

11in

stit

utio

nal

Ren

ovat

ion

$704

.00

To

cons

truc

tki

tche

nett

esin

room

son

seco

ndan

dth

ird

leve

lof

form

erC

ity$8

8,00

0.00

Mot

elas

per

info

rmat

ion

subm

itte

d.

2021

BP

0622

Jul-

17-2

101

4708

4830

Din

een

Dr

Paa

rR

enov

atio

nsLt

d.W

ard

11In

stit

utio

nal

Ren

ovat

ion

$200

.00

Con

stru

ctre

pair

sto

and

repl

ace

asph

alt

shin

gles

onbe

llto

wer

IToo

leH

all

-

$25,

000.

00U

NB

)as

per

info

rmat

ion

subm

itte

d.

2021

BP

0623

Jul-

17-2

101

4708

4810

Bai

ley

Dr

Paa

rR

enov

atio

nsLt

dW

ard

11

Inst

itut

iona

lR

enov

atio

n$5

6000

$70,

000

00C

onst

wct

reno

vati

onto

Lab

214/

216

inB

aile

yH

all

(UN

B)

aspe

rin

form

atio

nsu

bmit

ted.

2021

BP

0645

Jul-

30-2

101

4708

4830

Din

een

Dr

Kin

gC

onst

ruct

ion

War

d11

Inst

itut

iona

lR

enov

atio

n$9

12.0

0$1

14,0

0000

To

repl

ace

entr

ance

step

san

dla

ndin

gto

Too

leH

ail

(UN

B)

aspe

rpl

ans

subm

itte

d.

2021

BP

0670

Jul-

30-2

175

5272

3455

Kel

ly’s

Dr

Gilb

ert

Bro

wn

War

d12

Min

iH

ome

New

$155

.00

$90,

000

00P

laa

min

ihom

e

2021

BP

0588

Jul-

07-2

175

0033

4362

Em

mer

son

St

Col

leen

Ton

er-M

iem

icki

War

d7

Pool

New

$64.

00$8

,000

To

plac

ene

w21

’di

a.ab

ove-

grou

ndpo

olin

rear

yard

ofSD

Das

per

plan

subm

itte

d.

2021

BP

0596

Jul-

09-2

101

4659

5450

Can

terb

urY

Dr

Pam

ela

Maz

erol

leW

ard

8P

ool

New

$104

.00

$13,

000.

00T

oco

nstr

uct

new

24’

abov

egr

ound

pool

and

fenc

ein

rear

yard

ofSD

Das

per

plan

subm

itte

d.

2021

BP

0599

Jul-

09-2

175

3238

9924

For

est

Acr

esC

itD

avid

Hic

key

War

d8

Poo

lN

ew$5

6.00

$7,0

0000

To

cons

truc

tne

w24

’on

-gro

und

pool

inre

arya

rdof

SDD

aspe

rpl

ansu

bmit

ted.

2021

BP

0602

Jul-

09-2

175

2636

4042

9B

road

StW

esto

nFr

ontin

War

d3

Pool

New

$320

.00

Con

stru

ctne

w16

’x

32in

-gro

und

pool

inre

arya

rdof

SDD

aspe

rpl

an$4

0,00

0.00

subm

itte

d.

Pri

nted

8/4/

2021

2:17

:25

PMP

age

1of

1

2021

BP

0619

Jul-

20-2

101

4386

6210

2A

berd

een

StM

icha

elK

indr

edW

ard

10Po

olN

ew$2

80.0

0T

oco

nstr

uct

new

14x

28in

-gro

und

pool

inre

arya

rdof

dupl

exas

per

$35,

000.

00in

form

atio

nsu

bmit

ted.

2021

BP

0649

Jul-

23-2

175

4828

1024

Don

ald

StD

arcy

Clo

wat

erW

ard

2Po

olN

ew$4

8.00

$5,5

75.0

0T

opl

ace

new

16’

diam

.ab

ove-

grou

ndpo

olin

rear

yard

ofSD

D

2021

BP

0651

Jul-

22-2

175

3556

2846

Rid

gew

ell

P1A

ndre

wD

icki

nson

War

d12

Pool

New

$400

.00

$50,

000.

00C

onst

ruct

new

in-g

roun

dpo

olin

rear

yard

ofSD

Das

per

plan

subm

itte

d

2021

BP

0385

Jul-

05-2

175

5134

7367

Car

ding

Way

JJR

Dev

elop

men

tsLt

d.W

ard

5S

emi

Det

ache

dR

enov

atio

n$1

76.0

0T

ofi

nish

bas

emen

tin

sem

ide

tach

eddw

ellin

g(6

7C

ardi

ngW

ay)

aspe

r$2

2,00

0.00

info

rmat

ion

subm

itte

d.20

21B

P05

61Ju

l-08

-21

7549

2918

213

Gar

den

St

Ale

xO

ldfi

eld

War

d12

Sem

iD

etac

hed

Ren

ovat

ion

$48.

00T

ore

plac

eex

isti

ngre

arya

rdde

ckw

ithne

w10

’x

12’

deck

inre

arya

rdof

sem

i$5

,800

.00

deta

ched

dwel

ling

aspe

rin

form

atio

nsu

bmit

ted.

2021

BP

0566

Jul-

23-2

101

5108

5827

5R

ains

ford

LnM

arte

llC

usto

mH

omes

War

d12

Sem

iD

etac

hed

New

$3,5

12.0

0T

oco

nstr

uct

new

sem

ide

tach

eddw

ellin

g(f

orfu

ture

subd

ivis

ion

into

thei

row

n$4

38,7

96.0

0pa

rcel

s)as

per

plan

ssu

bmit

ted.

2021

BP

0641

Jul-

23-2

175

5134

7367

Car

ding

Way

JJR

Dev

elop

men

tsLt

d.W

ard

5S

emi

Det

ache

dR

enov

atio

n$1

20.0

0T

ofi

nish

bas

emen

tin

sem

ide

tach

eddw

ellin

g(7

1C

ardi

ngW

ay)

aspe

rpl

ans

$15,

000.

00su

bmit

ted.

2021

BP

0449

Jul-

20-2

101

4782

0520

9C

olon

ial

Hts

Kns

tian

Moo

reW

ard

12S

ingl

eD

etac

hed

Ren

ovat

ion

$240

.00

To

cons

truc

tad

diti

onal

livin

gsp

ace

inex

isti

ngat

tach

edga

rage

onSD

Das

per

$30,

000.

00D

wel

ling

plan

ssu

bmit

ted.

2021

BP

0477

Jul-

20-2

101

4261

1320

3C

amey

St

Dan

iel

Cai

ssie

War

d6

Sin

gle

Det

ache

dR

enov

atio

n$5

60.0

0$7

0,00

0.00

Con

stru

ctfu

llre

nova

tion

toSD

Das

per

plan

ssu

bmit

ted.

Dw

ellin

g

2021

BP

0541

Jul-

05-2

101

4771

0856

Ash

fiel

dSt

Ton

yM

erze

ttiW

ard

6S

ingl

eD

etac

hed

Ren

ovat

ion

$144

.00

$18,

000.

00R

epla

ce18

win

dow

s(5

br)

inSD

D.

Dw

ellin

g

2021

BP

0547

Jul-

13-2

175

3556

5123

Fle

etC

itR

obC

ase

Hom

esW

ard

12S

ingl

eD

etac

hed

Ren

ovat

ion

$416

.00

Con

stru

ctin

teri

orre

nova

tion

toen

suit

ew

ashr

oom

onse

cond

leve

lof

SDD

$52,

000.

00D

wel

ling

(ori

gina

lpl

umbi

nglo

cati

ons)

aspe

rin

form

atio

nsu

bmit

ted.

2021

BP

0567

Jul-

05-2

175

3949

9925

3H

eron

Dr

R.

Fos

ter

Dev

elop

men

tsL

td.

War

d2

Sin

gle

Det

ache

dN

ew$1

,824

.00

$228

,000

.00

Con

stw

ctne

wSD

Das

per

plan

ssu

bmit

ted.

Dw

ellin

g

2021

BP

0568

Jul-

05-2

175

3949

9924

7H

eron

Dr

R.

Fos

ter

Dev

elop

men

tsLt

d.W

ard

2S

ingl

eD

etac

hed

New

$2,0

00.0

0$2

50,0

00.0

0C

onst

ruct

new

SDD

aspe

rpl

ans

subm

itte

d.D

wel

ling

2021

BP

0569

Jul-

09-2

175

5138

1215

LeB

aron

Crt

Dav

eH

awki

nsC

onst

ruct

ion

Ltd

War

d1

Sin

gle

Det

ache

dN

ew$3

,000

.00

$375

,000

.00

Con

stru

ctne

wSD

Das

per

plan

ssu

bmit

ted.

Dw

ellin

g

2021

BP

0578

Jul-

09-2

175

3139

5711

Spa

rrow

LnR

egin

ald

Man

zer

War

d5

Sin

gle

Det

ache

dR

enov

atio

n$7

50$1

Con

stru

ctre

nova

tion

tofi

nish

bas

emen

tin

SDD

.A

ppli

cant

nolo

nger

Dw

ellin

gco

nstr

ucti

ngbas

emen

tap

artm

ent.

See

2021

BP

0106

.

2021

BP

0582

Jul-

19-2

175

5293

5478

Mal

ibu

St

Oak

hill

Hom

esIn

c.W

ard

5S

ingl

eD

etac

hed

New

$1,1

76.0

0$1

47,0

00.0

0C

onst

ruct

new

SDD

aspe

rpl

ans

subm

itte

d.D

wel

ling

2021

8P05

83Ju

l-29

-21

0147

1440

76W

ater

loo

Row

Adr

ian

But

tsW

ard

11S

ingl

eD

etac

hed

Ren

ovat

ion

$144

0.00

$180

,000

Con

stru

ctre

nova

tion

toSD

Das

per

scop

eof

wor

ksu

bmit

ted

Dw

ellin

g

2021

BP

0584

Jul-

09-2

175

5242

4948

Bar

crof

tD

rC

olpi

tts

Dev

elop

men

tsW

ard

12S

ingl

eD

etac

hed

New

$3,1

20.0

0$3

90,0

0000

Con

stru

ctne

wSD

Das

per

plan

ssu

bmit

ted

Dw

ellin

g

2021

BP

0592

Jul-

06-2

101

4305

11

203

Med

ley

St

S.O

.S.

Fire

Pro

tect

ion

Ltd.

War

d6

Sin

gle

Det

ache

dR

enov

atio

n$4

8.00

$5,5

0000

To

dem

olis

hre

arad

diti

onan

dto

repl

ace

asph

alt

shin

gles

onSD

Das

per

Dw

ellin

gin

form

atio

nsu

bmit

ted

2021

BP

0595

Jul-

09-2

175

4653

2828

1C

anad

aS

tJo

hnB

row

nW

ard

5S

ingl

eD

etac

hed

Ren

ovat

ion

$40.

00$4

,800

00T

oin

stal

lne

wen

try

door

onfr

ont

ofco

vere

dpo

rch

aspe

rin

form

atio

nsu

bmit

ted.

Dw

ellin

g

2021

BP

0597

Jul-

20-2

175

5070

2047

Aid

enS

tT

oday

sH

omes

Ltd

War

d2

Sin

gle

Det

ache

dN

ew$2

,200

.00

$275

,000

00C

onst

ruct

new

SDD

aspe

rpl

ans

subm

itte

d.D

wel

ling

2021

BP

0603

Jul-

13-2

101

4710

9338

2U

nive

rsity

Ave

Ada

mM

cGat

hey

Mas

onry

War

d11

Sin

gle

Det

ache

dR

enov

atio

n$2

4.00

$2,5

0000

To

reco

nstr

uct

uppe

rpo

rtio

nof

chim

ney

onSD

DD

wel

ling

2021

BP

0604

Jul-

12-2

101

4879

1762

3B

rook

side

Dr

Mar

itim

eR

adon

Con

trol

Ltd.

War

d2

Sin

gle

Det

ache

dD

emol

ition

$000

To

dem

olis

hSD

DD

wel

ling

2021

BP

0605

Jul-

12-2

101

4879

9061

7B

rook

side

Dr

Mar

itim

eR

adon

Con

trol

Ltd.

War

d2

Sin

gle

Det

ache

dD

emol

ition

$000

To

dem

olis

hSD

DD

wel

ling

2021

BP

0616

Jul-

16-2

101

5497

2444

1C

anad

aSt

Mic

hael

Duc

hesn

eau

War

d5

Sin

gle

Det

ache

dR

enov

atio

n$4

0.00

$4,5

0000

To

repl

ace

port

ions

ofdr

aint

ilear

ound

SDD

aspe

rin

form

atio

nsu

bmit

ted.

Dw

ellin

g

Pri

nted

8/4/

2021

2:17

:25

PMP

age

1of

1

2021

BP

0625

Jul-

14-2

101

4544

3863

9A

berd

een

StJo

yce

Sm

ith

War

d11

Sin

gle

Det

ache

dR

enov

atio

n$1

6.00

$2,0

0000

To

repl

ace

2w

indo

ws

(2B

R)

atre

arof

SDD

aspe

rin

form

atio

nsu

bmit

ted

Dw

ellin

g20

21B

P06

27Ju

l-19

-21

0140

1843

87R

urpe

eSt

Qua

lity

Roo

fing

Ltd

War

d1

Sin

gle

Det

ache

dR

enov

atio

n$3

2.00

$3,4

2300

To

repl

ace

apo

rtio

nof

asph

alt

shin

gles

onSD

DD

wel

ling

2021

BP

0628

Jul-

19-2

175

2865

676

Bre

ntw

ood

Dr

Qua

lity

Roo

fing

Ltd

War

d12

Sin

gle

Det

ache

dR

enov

atio

n$4

8.00

$5,3

76T

ore

plac

eas

phal

tsh

ingl

eson

SDD

Dw

ellin

g20

21B

P06

29Ju

l-19

-21

7549

2660

207

Mor

ning

Gat

eD

rT

arg

etts

Win

dow

san

dD

oors

War

d12

Sin

gle

Det

ache

dR

enov

atio

n$2

4.00

$3,0

0000

To

repl

ace

1en

try

dooro

nSD

Das

per

info

rmat

ion

subm

itte

dD

wel

ling

2021

BP

0630

Jul-

19-2

101

4518

5527

4O

xfor

dSt

Tar

gett

’sW

indo

ws

and

Doo

rsW

ard

9S

ingl

eD

etac

hed

Ren

ovat

ion

$56.

00$7

,000

00T

ore

plac

e7

vand

ows

(6B

R)

onSD

Das

per

info

rmat

ion

subm

itte

dD

wel

ling

2021

BP

0633

Jul-

21-2

175

0082

5035

Asc

otCr

1Je

nnif

erG

riff

ilhs

War

d8

Sin

gle

Det

ache

dR

enov

atio

n$2

48.0

0$3

0,34

100

To

repl

ace

viny

lsi

ding

onSD

Das

per

info

rmat

ion

subm

itte

dD

wel

ling

2021

BP

0634

Jul-

20-2

101

5581

0519

Har

grov

eC

rtM

.M

cNal

lyB

uild

ers

War

d6

Sin

gle

Det

ache

dR

enov

atio

n$3

20.0

0$4

0,00

000

room

and

dini

ngro

omon

mai

nle

vel

aspe

rD

wel

ling

2021

BP

0636

Jul-

20-2

101

4322

0225

7S

ewel

lSt

Win

Nau

gler

War

d6

Sin

gle

Det

ache

dR

enov

atio

n$1

6.00

$2,0

0000

To

repl

ace

cove

red

entr

yon

SDD

aspe

rpl

ans

subm

itte

dD

wel

ling

2021

BP

0647

Jul-

23-2

175

2496

9819

Bax

ter

Cr1

Phili

pK

eyse

rW

ard

7S

ingl

eD

etac

hed

Ren

ovat

ion

$16.

00$2

,000

00T

ore

plac

eex

isti

ng8’

x16

deck

for

new

6’x

12’

free

stan

ding

deck

inre

arya

rdD

wel

ling

ofSD

D

2021

BP

0648

Jul-

27-2

175

4170

6342

Sha

yla

Cii

Col

eA

nder

son

War

d2

Sin

gle

Det

ache

dN

ew$2

,160

.00

$270

,000

00C

onst

ruct

new

SDD

aspe

rpl

ans

subm

itte

dD

wel

ling

‘‘“

.i‘

.p

•!,

.,

,20

21B

P06

54Ju

l-27

-21

0142

8739

149

Hen

rySI

Tru

carp

entr

yW

ard

6S

ingl

eD

etac

hed

Ren

ovat

ion

$440

.00

$55,

000

0013

wnd

ows

(6B

R),

1en

try

door

,in

crea

seat

tic

insu

lati

onan

dve

ntil

atio

nan

dD

well

ing

h.i

d,‘‘

‘€-

2021

BP

0655

Jul-

27-2

101

5590

6116

Bri

dgev

iew

Cr1

Firs

tO

nsit

eP

rope

rty

Res

tora

tion

War

d6

Sin

gle

Det

ache

dR

enov

atio

n$5

6.00

$6,3

0000

To

repl

ace

side

yard

deck

onSD

Ddu

eto

fire

dam

age

aspe

rpl

ans

subm

itte

dD

wel

ling

2021

BP

0659

Jul-

27-2

175

2497

1413

5H

eam

eSI

Bra

dley

Mat

thew

sW

ard

7S

ingl

eD

etac

hed

Ren

ovat

ion

$600

.00

$74,

195

00C

onst

wct

reno

vati

ons

toki

tche

nan

dfa

mily

room

inSD

D.

No

stru

ctur

alw

alls

Dw

ellin

gm

odif

ied

No

new

plum

bing

.

2021

BP

0660

Jul-

26-2

101

4365

3423

4P

arkh

urst

Dr

Cas

eyB

utle

rR

oofi

ngLt

d.W

ard

10S

ingl

eD

etac

hed

Ren

ovat

ion

$40.

00$5

,000

00R

epla

cero

ofsh

ingl

eson

SDD

Dw

ellin

g

2021

BP

0586

Jul-

19-2

101

4597

0052

2T

wee

dsm

uir

StC

olpi

tls

Dev

elop

men

tsW

ard

11S

ingl

eD

etac

hed

New

$2,3

92.0

0$2

98,5

0000

Con

slru

ctne

wSD

Dw

ithbas

emen

tap

artm

ent

aspe

rpl

ans

subm

itte

dD

wel

ling

/Apa

rtm

ent

TO

TA

LS

$164

,682

.0$2

0,64

5,00

2.00

0

Pri

nted

8/4/

2021

2:17

:25

PMP

age

1of

1

BUILDING INSPECTION REPORT FOR August 2021

PERMITS VALUE VALUE OF CONST.YEAR TO DATE

SAME PERIODLAST YEAR

RESIDENTIALSINGLE UNITSNewAdditions

9 $2,794,000 $17,282,565$489,000

$15,350,000$297,500

MINI HOMESNew 2 $235,000 $532,000 $764,000Additions

2 UNIT DWELLINGSNewAdditions

I $415,000 $4,278,296 $2,290,000

BASEMENT APTSNew $162,500

TOWNHOUSESNewAdditions

$5,485,000 $4,260,000

APARTMENT BLDG.NewAdditions

$60,091,260$415,000

$32,898,200

ACCESSORY BLDGStorage BuildingCarport/Ga rageSwimming PoolDeck

$16,400$276,295$225,001

$329,100$738,295

$1,074,736$52,900

$224,444$569,000$630,628$319,946

RENOV/REPAIRS 42 $979,058 $7,580,436 $7,354,559

556

TOTAL RESIDENTIAL $4,940,754 $98,511,088 $64,958,277

PERMITS VALUE VALUE OF CONST. SAME PERIODYEAR TO DATE LAST YEAR

COMMERCIALNew - $3,085,000 $220,000Additions - - $50,000 $942,500Renov/Repairs 15 $1,532,749 $12,771,687 $11,824,324

INDUSTRIALNew - $305,000Additions - - - -

Renov/Repairs - - $207,000 -

GOVERN (MunjNew - - -

Additions -

Renov/Repairs - $546,613 $157,734

GOVERN (Fed/Prov)New - $2,559,000 $60,000Additions - - $11,924,100Renov/Repairs 2 $598,000 $23,531,350 $6,098,004

INSTITUTIONALNew - $500,000Additions - - - -

Renov/Repairs 2 $188,538 $951,310 $6,278,782

Others $1,000

DEMOLITION 3 -

TOTALS 92 $7,260,041 $142,214,048 $103,268,721DEMOLITIONS (21,414,422 August 2020)

360 Union Street - Single Detached Dwelling

25 Bailey Drive - Commercial Building

16 MacKay Drive - South Gym (UNB)

Aug-21NUMBER OF NEW DWELLING UNITS

August 2021 THIS YEAR August 2020 SAME PERIODTO DATE LAST YEAR

SINGLEUNITS io 65 19 642UNITDWELLINGS 2 19 2 14BASEMENTAPARTMENTS o 9 0 1APARTMENTUNITS 0 466 28 326TOWNHOUSE UNITS 0 31 0 38TOTAL 12 590 49 443

NUMBER OF PERMITS ISSUED

BUILDING PERMITS PLUMBING PERMITS SIGN PERMITS

August 2021 TO DATE August 2021 TO DATE August 2021 TO DATE92 727 44 295 7 58

FEES FOR BUILDING PERMITS ISSUEDSAME PERIOD

August 2021 TO DATE August 2020 LAST YEAR$5661 3.00 $1 ,1 34,836.00 $1 70,643.50 $822211.00

FEES FOR PLUMBING PERMITS ISSUEDSAME PERIOD

August 2021 TO DATE August 2020 LAST YEAR$18,940.00 $168,450.00 $10,380.00 $124,300.00

FEES FOR SIGN PERMITSSAME PERIOD

August 2021 TO DATE August 2020 LAST YEAR$700.00 $5,700.00 $900.00 $4,550.00

TOTAL FEES - BUILDINGIPLUMBINGISIGNSSAME PERIOD

August 2021 TO DATE August 2020 LAST YEAR$76,253.00 $1,308,986.00 $181,923.50. $951,061.00

SUBMITTED BY:

________________________

APPROVED BY: $fAE

Fred

eric

tcn

Gro

wth

&C

om

mun

ity

Ser

vic

esD

epar

tmen

t

Issu

edB

uild

ing

Per

mit

sS

ort

edby

Str

uct

ure

Typ

e

Bui

ldin

gIn

spec

tion

sD

ivis

ion

397

Que

enSt

,P.

O.

Boo

130

FR

ED

ER

ICT

ON

,N

BE

3B4Y

7P

hone

460-

2029

/Fa

o:46

0-21

26A

ugust

2021

Per

mit

#Is

sue

PID

Pro

ject

Lo

cati

on

Ap

pli

can

tW

ard

Str

uct

ure

Typ

e:T

ype

ofW

ork:

Per

mit

Fee

Val

ueD

escr

ipti

on

Dat

e20

21B

P07

09A

ug-1

6-21

7535

7152

15T

odd

St

Gra

ves

Bar

ns&

Bui

ldin

gsLt

dW

ard

12A

cces

ory

Bui

ldin

gN

ew$5

6.00

$6,9

00.0

0C

onst

ruct

new

10o

14sh

edin

rear

yard

ofm

ini

hom

eas

per

plan

ssu

bmit

ted.

2021

BPO

716

Aug

-i8-

2175

0263

9367

Cas

tlet

onCr

1M

arce

llo

Bat

tila

naW

ard

12A

cces

ory

Bui

ldin

gN

ew$7

50$1

000.

00T

opl

ace

new

70

7sh

edin

rear

yard

ofSO

Das

per

plan

subm

itte

d

2o

2tB

P0

73

2A

ug-3

1-21

0148

1548

36N

orfo

lkD

rD

erek

Nau

gler

War

d8

Acc

esor

yB

uild

ing

New

$24.

00$2

,500

.00

To

cons

truc

tne

w10

o12

shed

insi

deya

rdof

SOD

aspe

rpl

ans

subm

itte

d.

2o2t

BP

O73

5A

ug-2

6-21

7549

7198

123

Reb

aC

res

Lee

Mill

erW

ard

2A

cces

ory

Bui

ldin

gN

ew$4

000

$5,0

00.0

0C

onst

ruct

new

12o

16sh

edin

rear

yard

viSO

Das

per

plan

ssu

bmit

ted

2021

BP

0733

Aug

-27-

2175

0144

561

Yor

kS

tH

arve

stJa

zzan

dB

lues

Acc

esso

ryB

uild

ing

New

$7.5

0$1

,000

.00

To

inst

all

ate

mpo

rary

tent

stru

ctur

efo

rth

eH

arve

stJa

zzan

dB

lues

Fes

tiva

lfr

omS

ept

10th

toS

ept

19th

aspe

rpr

evio

usy

ears

subm

issi

on.

2021

BP

0443

Aug

-04-

2101

4325

6667

7U

nion

St

Ric

kK

elly

War

d4

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$2

4.00

$3,0

00.0

0T

oin

stal

lm

etal

roof

ing

onap

artm

ent

buil

ding

2021

BP

0548

Aug

-09-

2175

4740

5670

0F

ores

tH

illR

dT

hree

0F

abri

cati

ons

Ltd

War

d8

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$4

00.0

0$5

0,00

0.00

Con

stru

ctin

teri

orre

nova

tion

toun

its

114

&71

7in

eois

ting

apar

tmen

tbu

ildi

ngas

per

plan

subm

itte

d

2021

BP

0608

Aug

-11-

2175

4277

6516

7G

reen

fiel

dsO

rG

roun

dC

ontr

olP

rope

rty

Ser

vice

sW

ard

9A

part

men

tB

uild

ing

Ren

ovat

ion

$200

.00

$25,

000.

00C

onst

ruct

inte

rior

reno

vati

onto

unit

#23

ineo

isti

ngap

artm

ent

buil

ding

aspe

rpl

ansu

bmit

ted.

2021

BF

0609

Aug

-11-

2175

4277

5720

1G

reen

fiel

dsCr

1G

roun

dC

ontr

olP

rope

rty

Ser

vice

sW

ard

9A

part

men

tB

uild

ing

Ren

ovat

ion

$200

.00

$25,

000.

00C

onst

ruct

inte

rior

reno

vati

onto

unit

#24

ineo

isti

ngap

artm

ent

buil

ding

aspe

rpl

ansu

bmit

ted

2021

BP

0626

Aug

-04-

2101

4072

5366

Haw

kins

St

Wiz

inja

Con

stru

ctio

nW

ard

4A

part

men

tB

uild

ing

Ren

ovat

ion

$16.

00$1

,400

.00

Cvn

stru

ctpa

rtit

ion

and

inst

all

20m

inut

efir

edoort

ose

par

ate

evil

stai

rsfr

vm

laun

dryr

uom

aspe

rsk

etch

subm

itte

d(F

ire

Mar

shal

l’s

requ

irem

ent(

2021

BP

0665

Aug

-06-

2175

4158

3651

Lia

nS

tS

ervi

ceM

aste

rW

ard

9A

part

men

tB

uild

ing

Ren

vvat

ivn

$160

.00

$20,

000.

00T

ore

plac

eth

e2

laye

rsof

5/8

Typ

eX

ceil

ing

dryw

all

and

insu

lati

onin

Uni

t4

due

tow

ater

dam

age

2021

BP

0704

Aug

-16-

2175

3888

5084

5M

cLeo

dA

veC

apit

alC

ityR

ooti

ng(2

0071

Ltd

.W

ard

11

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$5

36.0

0$6

6,40

000

To

repl

ace

asph

alt

shin

gles

onap

artm

ent

buil

ding

.

2021

BP

0705

Aug

-16-

2101

4338

3811

5C

harl

otte

St

Kya

nC

onst

ruct

ion

War

dtO

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$1

1200

$13,

197.

00C

onst

ruct

new

pitc

hed

roof

onpo

rtio

non

mul

hre

side

ntia

lbu

ildi

ngas

per

plan

ssu

bmit

ted

2021

BF

0726

Aug

-25-

2175

0021

3975

Gre

enfi

elds

Dr

Kill

amA

part

men

tR

EIT

War

d9

Apa

rtm

ent

Bui

ldin

gR

enov

atio

n$2

00.0

0$2

5,00

0.00

Con

stru

ctin

teri

orre

nova

tion

toan

it#

16in

eois

ting

apar

tmen

tbu

ildi

ngas

per

plan

subm

itte

d.

2021

BP

061

1A

ug-1

2-21

0150

0123

60W

ildw

ood

LnR

andy

Whe

atun

War

d12

Att

ache

dG

arag

eA

dditi

on$1

520.

00$1

90,0

00.0

0C

onst

ruct

gar

age

addi

tion

with

livin

gsp

ace

abov

eas

per

plan

ssu

bmit

ted

2021

BP

0468

Aug

-19-

2101

4694

5192

1C

olle

geH

illR

dR

PC

War

d1 1

Com

mer

cial

Bui

ldin

gR

enov

atio

n$2

,400

00$3

00,0

00.0

0C

onst

ruct

upgra

des

toH

VA

Csy

stem

onle

vel

0of

com

mer

cial

buil

ding

(RP

C(

aspe

rpl

ans

subm

itte

d

2021

BP

0520

Aug

-30-

2101

4395

2016

9D

undo

nald

St

Sim

pson

Bui

ldin

gC

ontr

acto

rsLt

dW

ard

10C

omm

erci

alB

uild

ing

Ren

ovat

ion

$1,1

04.0

0$1

38,0

00.0

0C

onst

ruct

reno

vati

onto

eopa

ndM

oore

Fam

ily

Den

tist

ryin

suit

e#4

(eoi

stin

gde

ntal

offi

ce(

ofco

mm

erci

albu

ildi

ngas

per

plan

ssu

bmit

ted.

2021

BP

0587

Aug

-16-

2175

3858

4944

0K

ing

St

Avo

ndal

eC

onst

ruct

ion

Ltd

War

d11

Com

mer

cial

Bui

ldin

gR

enov

atio

n$1

,280

.00

$160

,000

.00

Con

stru

ctin

teri

orre

nova

tion

toeo

isti

ngG

NB

offi

ces

on5t

hle

vel

ofco

mm

erci

albu

ildi

ngas

pet

plan

ssu

bmit

ted

2021

BP

0644

Aug

-03-

2175

5214

9258

0T

wo

Nat

ions

Cro

ssS

tree

tGre

ekW

ard

4C

omm

erci

alB

uild

ing

Ren

ovat

ion

$1,1

20.0

0$1

40,0

00.0

0C

onst

ruct

inte

rior

fit-

upfo

rne

wS

tree

tGre

ekR

esta

ura

nt

insu

ite

#6of

com

mer

cial

buil

ding

aspe

rpl

ans

subm

itte

d.

2021

BF

0656

Aug

-05-

2175

3335

9125

Bai

ley

Ave

Cha

rmac

Con

stru

ctio

nC

oLt

dW

ard

1C

omm

erci

alB

uild

ing

Dem

oliti

onso

.oo

To

dem

olis

hco

mm

erci

albu

ildi

ngas

per

info

rmat

ion

subm

itte

d.

2021

BP

0666

Aug

-i1-

2175

3628

305

Aco

rnS

tIa

nF

lana

gan

War

d9

Com

mer

cial

Bui

ldin

gR

enov

atio

n$4

40.0

0$5

5,00

0.00

Con

stru

ctfi

t-up

ofS

uite

#3fo

rB

liss

Gif

tB

outi

que

aspe

rpl

ansu

bmit

ted

2021

BP

0671

Aug

-12-

2175

2871

9390

0H

anw

ell

Rd

Arg

uson

Pro

ject

sIn

cW

ard

9C

omm

erci

alB

uild

ing

Ren

ovat

ion

$3,2

0000

$399

,024

.00

Con

stru

ctof

fice

fit-

upin

form

erH

ospi

cesp

ace

aspe

rpl

ansu

bmit

ted

2021

BP

0685

Aug

-26-

2175

4739

1850

Cro

wth

erLn

Bir

dC

onst

ruct

ion

Gro

upW

ard

8C

omm

erci

alB

uild

ing

Ren

ovat

ion

$1,8

00.0

0$2

25,0

00.0

0C

onst

ruct

reno

vati

onto

leve

ls2

and

3in

com

mer

cial

buil

ding

aspe

rpl

ans

subm

itte

d.

2021

BP

0692

Aug

-09-

2175

3638

2088

Mai

nS

tD

ave

The

Roo

fer

Inc

War

d4

Com

mer

cial

Bui

ldin

gR

enov

atio

n$1

60.0

0$1

9,50

0.00

To

repl

ace

asph

alt

shin

gles

onco

mm

erci

albu

ildi

ng(f

orm

erB

uffe

tE

opre

ss(.

2021

BP

0701

Aug

-13-

2101

4808

8811

77P

rosp

ect

St

Prio

rity

Per

mit

sW

ard

9C

omm

erci

alB

uild

ing

Ren

ovat

ion

$40.

00$5

,000

.00

Con

stru

ctsi

gnb

ase

for

new

free

-sta

ndin

gM

cDon

alds

sign

aspe

rpl

ans

subm

itte

d

2021

BP

0702

Aug

-13-

2101

4042

6894

Mai

nS

tPr

iori

tyP

erm

its

War

d4

Com

mer

cial

Bui

ldin

gR

enov

atio

n$4

0.00

$9,0

00.0

0C

onst

ruct

sign

bas

efo

rne

wtr

ee-s

tand

ing

“McD

onal

ds”

sign

aspe

rpl

ans

subm

itte

d

2021

BP

0707

Aug

-24-

2175

4980

6321

5M

ain

St

DeN

ovo

Con

stru

ctio

nIn

c.W

ard

4C

omm

erci

alB

uild

ing

Ren

ovat

ion

$240

.00

$30,

000.

00C

onst

ruct

inte

rior

lit-u

por

new

eyel

ash

stud

ioin

suit

e6

oten

isti

ngco

mm

erci

albu

ildi

ngas

per

plan

ssu

bmit

ted

2021

BP

0718

Aug

-18-

2175

3157

0517

Avo

nlea

Cr1

Qua

lity

Roo

fing

Ltd

War

d9

Com

mer

cial

Bui

ldin

gR

enov

atio

n$3

2.00

$3,2

2000

To

repl

ace

asph

alt

shin

gles

onup

per

port

ion

utro

oton

com

mer

cial

build

ing.

2021

BP

0729

Aug

-30-

2175

4318

3369

City

view

Ave

Jilli

anB

enne

ttW

ard

4C

omm

erci

alB

uild

ing

Ren

ovat

ion

$40.

00$5

,000

00C

onst

ruct

inte

rior

lit-u

pfo

rne

wha

irsa

lon

info

rmer

Mia

mi

Tan

ning

spac

eas

per

plan

ssu

bmit

ted

2021

BP

0736

Aug

-27-

2101

4462

8536

1Q

ueen

St

Kit

chen

Fas

hion

sW

ard

10C

omm

erci

alB

uild

ing

Ren

ovat

ion

$64

00$8

,000

.00

To

repl

ace

4eo

isti

ngw

indo

ws

onfr

ontf

acad

eot

com

mer

cial

build

ing

(Che

ssP

iece

Pat

isse

rie(

aspe

rin

form

atio

nsu

bmit

ted.

2021

BP

0667

Aug

-16-

2175

4980

6321

5M

ain

St

De

Nov

oC

onst

ruct

ion

Inc

War

d4

Com

mer

cial

/Res

iden

tial

Ren

ovat

ion

$320

00$4

0,00

0.00

Con

stru

ctli

t-up

ofsu

ite

#Gfo

rne

wm

assa

ge

clin

icas

per

plan

ssu

bmit

ted

2021

BP

0652

Aug

-05-

2101

4351

895

Her

mit

age

Cr1

Mic

hael

Allo

ttW

ard

12D

etac

hed

Gar

age

New

$232

00$2

9,00

0.00

To

cons

truc

tne

w26

o28

det

ach

edg

arag

ein

rear

yard

ofSO

Das

per

plan

ssu

bmit

ted.

2021

BP

0658

Aug

-17-

2175

4735

5359

3B

rook

side

Or

Cap

ital

City

Roo

ting

(200

71Lt

dW

ard

2D

etac

hed

Gar

age

New

$80.

00$1

0,00

000

Con

stru

ctne

w16

o20

acce

sso

rybu

ildi

ngin

rear

yard

ofSO

Das

per

plan

ssu

bmit

ted.

2021

BP

0699

Aug

-i6-

2175

4508

741S

iP

eter

sD

rT

affy

Lak

eE

nter

pris

esW

ard

2D

etac

hed

Gar

age

New

$184

00$2

2,29

500

Con

stru

ctne

w12

o20

det

ach

edac

cess

ory

buil

ding

inre

arya

rdof

SOD

aspe

rpl

ans

subm

itte

d

2021

BP

0738

Aug

-25-

2175

2718

0927

5Je

wel

tS

tD

ougl

asT

aylo

rW

ard

1D

etac

hed

Gar

age

New

$200

.00

$25,

000

00T

ore

mov

e2

eois

ting

8u

10sh

eds

and

toco

nstr

uct

new

18’

o24

’d

etac

hed

gar

age

insi

deya

rdof

SOD

aspe

rpl

ans

subm

itte

d

2021

BP

0689

Aug

-11-

2101

4482

2430

5Y

ork

St

Tru

carp

entr

yW

ard

10D

uple

oR

enov

atio

n$1

12.0

0$1

4,00

0.00

Con

stru

ctw

ashr

oom

reno

vati

onto

eois

ting

was

hroo

mor

upst

airs

ten

ant

indu

pleo

aspe

rpl

ansu

bmit

ted

Fiot

ure

loca

tion

tore

mai

nas

eois

ting

2021

BP

0679

Aug

-06-

2101

4993

1859

8L

inco

lnR

dJa

son

Lal

oach

eR

oofi

ngW

ard

7F

eder

al/P

rovi

ncia

lR

enov

atio

n$2

72.0

0$3

4,00

0.00

Rep

lace

roof

shin

gles

onpr

ovin

cial

build

ing

2021

BP

0710

Aug

-13-

2101

4378

5493

Wvv

dsto

ckR

dU

ltim

ate

Win

dow

san

dD

oors

Fed

eral

/Pro

vinc

ial

Ren

ovat

ion

$4,5

1200

$564

,000

.00

Rep

lace

all

win

dow

sin

Old

Gov

ernm

ent

Hou

seas

per

plan

ssu

bmit

ted

2021

BP

0635

Aug

-06-

2101

4642

5454

0W

inds

orS

tK

ing

Con

stru

ctio

nW

ard

11In

stit

utio

nal

Ren

ovat

ion

$712

.00

$88,

888.

00T

ore

plac

eeu

teri

orst

eps

and

guar

dto

Gill

inH

all

(UN

B(

and

tore

pair

port

ions

ofsi

dew

alk

aspe

rpl

ans

subm

itte

d

2021

BP

0639

Aug

-13-

2101

4708

4841

Din

een

Or

Wal

lC

onst

ruct

ion

Ser

vice

sW

ard

11

lnsh

tuti

onal

Ren

ovat

ion

$800

00$9

9,65

0.00

Con

stru

ctre

nova

tion

toro

oms

#7&

9in

Law

Bui

ldin

g(U

NB

(as

per

plan

ssu

bmit

ted.

2021

BP

0706

Aug

-16-

2101

4694

4416

Mac

Kay

Dr

CN

.F.

Mal

let

LIc

e.W

ard

11In

stit

utio

nal

Dem

oliti

on$0

.00

To

dem

olis

hS

outh

Gym

(UN

B(

aspe

rin

form

atio

nsu

bmin

ed.

2021

BP

0459

Aag

-04-

2101

4888

7315

Gle

nmar

Dr

Bui

ltB

yPh

illip

sW

ard

2M

ini

Hom

eR

enov

atio

n$2

400

$2,1

5000

To

cons

truc

tne

w6

04’

free

stan

ding

deck

neot

tom

inih

ome

aspe

rpl

ans

subm

itte

d.

2021

BP

0693

Aug

-30-

2175

3571

5215

Tod

dS

tO

akhi

llH

omes

Inc

War

d12

Min

iH

ome

New

$155

.00

$150

,000

.00

To

rem

ove

enis

ting

min

iho

me

and

repl

ace

with

new

min

iho

me

aspe

rpl

ansu

bmit

ted

2021

BP

0696

Aug

-13-

2175

5272

3432

7G

ovet

nor

LnC

arm

onE

llis

War

d12

Min

iH

ome

New

$155

.00

$85,

000

00T

ore

mov

eeo

isti

ngm

inih

ome

and

plac

eus

edm

inih

ome

at32

7G

over

nor

Lan

e

2021

BP

0740

Aug

-27-

2175

5408

5640

Bar

ring

ton

Rd

Cha

rles

Flo

wer

sW

ard

12M

ini

Hom

eR

enov

atio

n$7

2.00

$8,2

75.0

0T

ore

plac

eeo

isti

ng12

’o

16de

ckon

side

ofm

ini

hom

eas

per

info

rmat

ion

subm

itte

d

2021

BP

0687

Aug

-16-

2175

4508

7415

1P

eter

sD

rC

arol

eS

herr

ard

War

d2

Poo

lN

ew$8

8.00

$11

000.

00T

opl

ace

an18

’di

a.ab

ove-

grou

ndpo

olin

the

teat

yard

aspe

rsi

tepl

ansu

bmit

ted.

2021

BP

071

1A

ug-1

6-21

0147

4022

189

Cas

eS

tM

ark

Tho

mps

onW

ard

7Po

olN

ew$8

0.00

$9,5

00.0

0T

opl

ace

new

15o

30po

olan

dfe

nce

inre

arya

rdof

SOD

aspe

rpl

ansu

bmit

ted

2021

BP

0713

Aug

-17-

2175

4510

1340

Sav

annah

Cr1

Ada

mS

pen

cer

War

d2

Pool

New

$296

.00

$36,

501

.00

To

cons

truc

tne

win

-gro

und

pool

inre

arya

rdof

SOD

aspe

rpl

ansu

bmit

ted

2021

BP

0717

Aug

-17-

2175

4510

2132

Sav

annah

Cr1

Rob

ert

Mar

tinW

ard

2Po

olN

ew$3

36.0

0$4

2,00

0.00

To

cons

truc

tne

w16

o32

in-g

roun

dpo

olin

rear

yard

ofSO

Das

per

plan

subm

itte

d.

2021

BP

0727

Aug

-20-

2175

4232

6929

Win

dflv

wer

Cr1

Bro

vke

McM

iIIa

nW

ard

8Po

olN

ew$4

80.0

0$6

0,00

0.00

To

cons

truc

tne

win

-gro

und

pool

inre

arya

rdof

SOD

aspe

rpl

ans

subm

itte

d.

2021

BP

0728

Aug

-24-

2175

4246

8978

Hel

ena

Cr1

Chr

isC

ocke

ram

War

d7

Pool

New

$528

.00

$66,

000.

00T

oco

nstr

uct

new

in-g

roun

dpo

olin

rear

yard

ofSO

Das

per

plan

subm

itte

d

2021

BP

0682

Aug

-16-

2175

5135

6475

Car

ding

Way

j.M

ureh

ouse

Dev

elop

men

ts&

Man

ageW

ard

5S

emi

Det

ache

dN

ew$3

,320

00$4

15,0

00.0

0C

onst

ruct

new

Sem

iD

etac

hed

Dw

ellin

gfo

rfu

ture

subd

ivis

ion

into

sep

arat

epr

oper

ties

aspe

rpl

ans

subm

itte

d

2021

BP

0723

Aug

-20-

2175

3830

4233

Kat

rina

Dr

Qua

lity

Roo

fing

Ltd

War

d1

Sem

iD

etac

hed

Ren

ovat

ion

$48.

00$5

,778

.00

To

repl

ace

asph

alt

shin

gles

onse

mi

det

ach

eddw

ellin

g(3

3&

35K

atri

na(.

2020

BP

1157

Aug

-16-

2101

5570

5720

Car

man

Ave

Jam

esC

onra

dW

ard

6S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$4

0.00

$5,0

00.0

0C

onst

ruct

new

fron

tad

diti

onan

dco

vere

dpo

rch

onSO

Das

per

info

rmat

ion

subm

itte

d

2021

BP

0589

Aug

-03-

2175

4524

908

Ang

eliq

ueCr

1R

ober

tH

illie

rW

ard

12S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$3

0400

$38,

000

00T

oco

nstr

uct

rear

addi

tion

belo

weo

isti

ngre

arya

rdde

ckon

SOD

aspe

rpl

ans

subm

itte

d

2021

BP

0593

Aug

-03-

2101

4543

0594

4Y

ork

St

Gri

ffin

End

eavo

rsLt

dW

ard

9S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

,008

.00

$126

,000

.00

Con

stru

ctin

teri

orre

nova

tion

onm

ain

leve

lof

SOD

aspe

rsc

op

eof

wor

ksu

bmit

ted.

2021

BP

0620

Aug

-12-

2101

4051

9062

6B

rook

side

Dr

Cap

ital

City

Roo

fing

(200

7(Lt

dW

ard

2S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

20.0

0$1

5,00

0.00

To

cons

truc

tne

wco

vete

dde

ckan

ddo

rmer

onfr

ont

ofSO

D.

2021

BP

0621

Aug

-12-

2175

5397

5960

5B

rook

side

Dr

Cap

ital

City

Roo

fing

(200

71Lt

dW

ard

2S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$3

2.00

$4,0

00.0

0T

ore

plac

efr

eest

andi

ngde

ckon

fron

tof

SOD

aspe

rin

form

atio

nsu

bmit

ted

2021

BP

0631

Aug

-i1-

2175

0379

8535

19W

oods

tock

Rd

Ern

ieM

cFad

zen

Sin

gle

Det

ache

dD

wel

ling

New

$2,5

6000

$320

,000

00T

oco

nstr

uct

new

SOD

aspe

rpl

ans

subm

itte

d

2021

BP

0653

Aug

-31-

2175

5138

1216

Gey

ssen

CR

TA

drie

nne

Par

sons

War

d1

Sin

gle

Det

ache

dD

wel

ling

New

$2,2

8800

$286

,000

.00

Con

stru

ctne

wSO

Das

per

plan

ssu

bmit

ted

2021

BP

0661

Aug

-06-

2175

1994

3023

Am

berw

ood

LnW

eB

uild

Con

trac

ting

War

d12

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$160

.00

$20,

000.

00R

epla

cesi

ding

with

viny

l,re

plac

e11

win

dow

s(5

Br(

,an

d1

door

inSO

D

2021

BP

0663

Aug

-06-

2101

4999

7917

1G

leng

arry

FlD

an’s

Con

stru

ctio

nW

ard

12S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$2

80.0

0$3

5,00

0.00

toin

stal

lha

rdie

plan

ksi

ding

with

1”co

debo

ard

behi

ndon

aSO

D

2021

BP

0664

Aug

-16-

2175

3560

8995

McG

rego

rS

tK

ent

Hom

esW

ard

1S

ingl

eD

etac

hed

Dw

ellin

gN

ew$1

,400

.00

$175

,000

.00

Con

stru

ctne

wSO

Das

per

plan

ssu

bmit

ted.

Pr(n

ted

9/1/

2021

10:0

0:01

AM

Pag

e1

of1

2021

BP

0668

Aug

-13-

2175

3949

9924

1H

eron

Dr

Cou

nty

Lin

eC

ontr

acto

rsIn

cW

ard

2S

ingl

eD

etac

hed

Dw

ellin

gN

ew$4224

00$528000.0

0C

onst

ruct

new

SDD

aspe

rpl

ans

subm

itte

d.20

21B

P06

69A

ug-0

4-21

0155

5788

17H

olly

broo

kS

tT

arget

tsW

indo

ws

and

Doo

rsW

ard

5S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

6.00

$2

00

000

Rep

lace

2b

asem

ent

win

dow

sin

OD

D-

non

bedr

oom

2021

BP

0673

Aug

-11-

2101

4397

9311

0D

xfor

dS

tFi

rst

Gen

eral

Ser

vice

sF

rede

rict

onW

ard

9S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

,400

.00

$175000.0

0C

onst

ruct

reno

vati

onto

mai

nle

vel

ofO

DD

due

tofi

red

amag

e.G

utti

ngm

ost

ofm

ain

floo

rto

fram

ing.

Firr

ing

wal

isto

acce

pt

R22

baIt

insu

lati

on,

noch

2021

BP

0676

Aug

-06-

2101

4138

2214

7B

urpe

eS

tB

ioR

ecov

ery

Can

ada

War

d1

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$144

.00

$ie

,ooo.o

oC

onst

ruct

inte

rior

reno

vati

onto

OD

D-

inte

rior

door

s,tr

im,

lam

inat

efl

oors

thro

aght

and

kitc

hen

cabi

nets

2O21

BP

O67

7A

ug-1

7-21

0142

4802

360

Uni

onS

tC

.BD

emer

chan

t&

Sons

War

d4

Sin

gle

Det

ache

dD

wel

ling

Dem

oliti

onso

.oo

Rem

ove

OD

Dfr

omlo

tfo

rre

loca

tion

20

2tB

Po

67

8A

ug-0

5-21

0141

0751

88V

inel

and

St

Infr

aspe

cU

nder

grou

ndIn

c.W

ard

3S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$8

0.00

$10,

000.

00R

epla

cefo

unda

tion

drai

ntil

ear

ound

OD

D20

21B

P06

83A

ug-0

6-21

7531

5382

176

Wig

gins

Dr

Fan

nyB

odar

tW

ard

3S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$3

200

$3,6

0000

Rep

lace

4w

indo

ws

(lbr

Ian

d1

door

onO

DD

2021

BP

0686

Aug

-09-

2101

5463

6515

You

ngS

tY

unqi

He

War

d5

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$40

00$5

,000

00S

elec

tive

dem

olit

ion

ofO

DD

due

tofi

red

amag

efo

asse

ssfu

rco

nstr

ucti

on.

202tB

P06e8

Aug

-16-

2101

4916

796

LaP

oint

eS

tM

ark

Don

aher

War

d5

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$56

00$6

,500

.00

Con

stru

ctne

ww

ashr

oom

inb

asem

ent

ofO

DD

aspe

rpl

ansu

bmit

ted

2021

BP

0690

Aug

-r1-

2101

4686

9321

8L

eeds

Dr

Qua

lity

Roo

fing

Ltd

War

d8

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$32

00$3

,869

.00

To

repl

ace

asph

alt

shin

gles

onO

DD

.

2021

BP

0691

Aug

-09-

2101

4098

2022

7C

edar

Ave

Dav

eT

heR

oofe

rIn

cW

ard

3S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$4

0.00

$4,2

00.0

0T

ore

plac

eas

phal

tsh

ingl

eson

OD

D.

2021

BP

0694

Aug

-24-

2101

4600

8858

2C

hest

nut

St

Min

glan

gLu

War

d9

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$104

00$1

3,00

0.00

Con

stru

ctre

nova

tion

toO

DD

,co

nstr

uct

new

bedr

oom

onm

ain

leve

l,re

plac

efl

oori

ngan

dto

repa

irpo

rtio

nsof

dam

aged

sidi

ngas

per

sco

pe

ofw

ork

si

2021

BP

0695

Aug

-11-

2101

4897

6487

3G

leng

arry

P1G

ranfW

est

War

d12

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$16

00$2

,000

.00

Rep

lace

asphal

tshin

gle

swit

hm

etal

roof

ing

2021

BP

0697

Aug

-16-

2170

3560

3061

McG

rego

rS

tU

ltim

ate

Win

dow

san

dD

oors

War

d1

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$400

.00

$50,

000.

00T

ore

plac

e16

win

dow

s(4

BR

),3

entr

ydo

ors

and

viny

lsi

ding

c/w

2ri

gid

insu

lati

onon

OD

D.

2021

BP

0698

Aug

-16-

2175

4508

7415

1P

eter

sD

rT

affy

Lak

eE

nter

pris

esW

ard

2S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

84.0

0$2

2,50

0.00

Con

stru

ctre

pai

rsto

uppe

rre

arde

ck,

dem

olis

hlo

wer

leve

lre

arde

ckan

dre

plac

ew

ithpa

ver

pati

oan

dco

nstr

uct

new

8’o

8’fr

eest

andi

ngde

ckin

rear

2021

BP

0708

Aug

-16-

2170

0427

3852

5W

etm

ore

Rd

R.F

oste

rD

evel

opm

ents

Ltd

War

d6

Sin

gle

Det

ache

dD

wel

ling

New

$2,1

20.0

0$2

65,0

0000

Con

stru

ctne

wO

DD

aspe

rpl

ans

subm

itte

d

2021

BP

0712

Aug

-17-

2101

4077

7410

3C

edar

Ave

Cl

Des

ign

Inc

War

d4

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$184

00$2

2,e7

o.oo

Des

ign

chan

ge

to20

21B

P02

14.

Sco

pe

ofw

ork

has

chan

ged

,no

lung

erco

nstr

ucti

ngfr

ont

addi

tion

Thi

sap

plic

atio

nis

tore

insu

late

exte

rior

wal

ls,

repI

2021

BP

0714

Aug

-24-

2170

0453

0123

Bla

keCr

1C

harl

ieC

amer

onW

ard

1S

ingl

eD

etac

hed

Dw

ellin

gN

ew$2

,800

.00

$350

,000

.00

Con

stru

ctne

wO

DD

aspe

rpl

ans

subm

itte

d.

2021

BP

0715

Aug

-17-

2175

4718

7014

5Ja

ffre

yS

tL

loyd

Bur

nsC

onst

ruct

ion

Ltd

War

d4

Sin

gle

Det

ache

dD

wel

ling

Ren

ovat

ion

$152

.00

$19,

000

00T

ore

plac

evi

nyl

sidi

ngc/

w1”

rigi

din

sula

fion

onO

DD

aspe

rin

form

atio

nsu

bmit

ted

2021

BP

0719

Aug

-18-

2101

4789

2422

Fol

eyC

rtQ

ualit

yR

oofi

ngLt

dW

ard

9S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$5

6.00

$6,6

58.0

0T

ore

plac

eas

phal

tsh

ingl

eson

OD

D

2021

BP

0724

Aug

-23-

2101

4476

3031

7W

estm

urla

ndS

tK

yan

Con

stru

ctio

nW

ard

10S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

52.0

0$1861

1.00

To

repl

ace

asphal

tsh

ingl

esw

ithne

wst

eel

roof

ing

onO

DD

.

2021

BP

0720

Aug

-25-

2170

5020

965

Cro

mfo

rdC

rt62

6952

NB

Ltd

.W

ard

SS

ingl

eD

etac

hed

Dw

ellin

gN

ew$2

,400

.00

$300

,000

.00

Con

stru

ctne

wO

DD

aspe

rpl

ans

subm

itte

d.

2021

BP

0734

Aug

-24-

2101

5563

4925

Man

zer

St

Ren

ovat

ions

Plu

s20

12In

c.W

ard

5S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$6

400

$7,5

00.0

0C

onst

ruct

inte

rior

reno

vati

onto

eois

ting

was

hroo

mon

mai

nle

vel

ofO

DD

aspe

rin

form

atio

nsu

bmit

ted

2021

BP

0737

Aug

-27-

2101

4525

8014

4P

embr

oke

Cre

sK

eehw

anJe

eW

ard

9S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$8

000

$9,5

5000

To

repl

ace

port

ion

ofdr

ain

tile,

appl

yw

ater

proo

fm

embr

ane

and

inst

all

2ne

ww

indo

ww

ells

onO

DD

aspe

rin

form

atio

nsu

bmit

ted

2021

BP

0739

Aug

-27-

2175

5444

2986

Mal

ibu

St

MV

LP

rope

rty

Res

tora

tion

War

d5

Sin

gle

Det

ache

dD

wel

ling

New

$2,1

60.0

0$2

70,0

00.0

0C

onst

ruct

new

OD

Das

per

plan

ssu

bmit

ted

2021

BP

0741

Aug

-30-

2101

4710

9338

2U

nive

rsit

yA

veA

dam

McG

athe

yM

ason

ryW

ard

11S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

6.00

$2,0

00.0

0T

ore

cons

truc

tup

per

port

ion

ofon

ead

diti

onal

chim

ney

onO

DD

(see

2021

BP

0603

I.

2021

BP

0742

Aug

-31-

2101

5459

2016

5C

anad

aS

tD

arre

nS

mit

hW

ard

5S

ingl

eD

etac

hed

Dw

ellin

gR

enov

atio

n$1

2000

$15,

000.

00T

ore

plac

edr

aint

ile,

appl

yw

ater

proo

fm

embr

ane

and

tore

pair

foun

dati

onw

all

atre

aran

dri

ght

side

ofO

DD

aspe

rin

form

atio

nsu

bmit

ted

2021

BP

0750

Aug

-31-

2101

4323

5012

9T

itus

St

JR

usso

nC

onst

ruct

ion

Ltd

War

d6

Sin

gle

Det

ache

dD

wel

ling

Ren

ovah

on$4

80.0

0$6

0,00

0.00

Con

stru

ctin

teri

orre

nova

tion

toki

tche

nan

dliv

ing

room

onm

ain

leve

lof

OD

Das

per

info

rmat

ion

subm

itte

d

2021

BP

0721

Aug

-30-

2175

4502

0576

1H

illc

rest

Dr

MV

LP

rope

rty

Res

tora

tion

War

d4

Sin

gle

Det

ache

dD

wel

ling/

Ap

New

$2,4

00.0

0$3

00,0

00.0

0C

onst

ruct

new

OD

Dan

db

asem

ent

apar

tmen

tas

per

plan

ssu

bmit

ted.

TO

TA

LS

$5

6,6

13

.00

$7

,26

0,0

41

.00

Prin

fed

9/1/

2021

10:0

0:01

AM

Pag

e1

of1