eBase20 Power System - Vertiv
-
Upload
khangminh22 -
Category
Documents
-
view
6 -
download
0
Transcript of eBase20 Power System - Vertiv
•
•
•
•
Power subrack
DCDU
BBU user equipment
Lithium battery
Rack air conditioner
DCDU
BBU user equipment
Rack air conditioner
GFSU North of equipment cabinet
( )
: ,
: ,
:
: ,
: ( )
: , ;
: , ;
,
( )
: ,
: ,
: ( )
: ( ),
: ( )
: , ;
: , ;
,
( )
: ,
: ,
: ( )
: ( ),
: ( )
: , ;
: , ;
,
、
( ) ~ ( )
( ) ~ ( )
( ) ~ ( )
( ) ~ ( )
( ) ~ ( )
≥
~
- ℃~+ ℃
- ℃~+ ℃
% ~ % ( ℃± ℃, )
≤ (
℃ )
× ×
≤ ( )
≤ ( )
≤
≤
:
:
:
:
:
:
℃~ ℃
≤
Ω
≤
≤
≤
Power cabinet
Relay
Air conditioner indoor unit
Air conditioner outdoor unit
temperature/humidity
Air conditioner indoor unit
Relay
Air conditioner outdoor unit
Equipment cabinet 1
Subrack power
M530B
AC ammeter
temperature/humidity
RS485
Blower Blower Smoke sensor
Water detection
Smoke sensor
Water detection
Display screen
Air conditioner indoor unit
Relay
Air conditioner outdoor unit
Equipment cabinet 2
temperature/humidity
RS485
BlowerSmoke sensor
Water detection
GFSU
environment
monitor
700 700 700 700
10
00
80
0
800
Battery
cabinet1
A/C
cabinet
Power
cabinet
Front of E-Base system
Front clearance ≥ 1.5mSide clearance
≥ 0.8m
The external unit
should close to
A/C cabinet
External unit of A/C
Clearance between cabinet
side and the wall ≥ 0.8m
A/C
cabinet
Installation Position for Parallel Parts Enlarged view of Parallel Parts
Remove the rubber
stopper before tightening
the parallel connection
室外机
液侧管(不得受阳光直射)
最高
10
m
室内机穿墙保护管
隔离地板
进口作密封处理 气侧管 隔热材料 地板 冷凝水排水管(伸到
室外排放冷凝水)
1:200
机柜
Up to
15
m
Outdoor unit
Liquid side tube (no direct sunlight)
Inlet is sealed
Wall protection tube
Isolation floor
Air side tube
Cabinet
Indoor unit
Insulation materials Floor Condensate draining pipe (out into
the outdoor discharge condensate)
室外机
液侧管(不得受阳光直射)
穿墙保护管
隔离地板进口作密封处理
气侧管 隔热材料 地板 冷凝水排水管(伸到
室外排放冷凝水)
1:200
室内机
机柜
最高5m
Inlet is sealed
Liquid side tube (no
direct sunlight)
Isolation floor
Wall protection tube
Air side tube Insulation materials Floor Condensate draining pipe (out into
the outdoor discharge condensate)
Outdoor unit
Indoor unit
Cabinet
Up to 5cm
室外机
支架
气流
气流
注:2台室外机需叠放时,可采用5#角钢作支架。 3台以上室外机需叠放时,应采用6.5#槽钢作支架。
4m 0.5m
50mm50mm
至少50mm
基座 室外机机座
室外机
Air flow
Outdor
unit
Outdor
unit
Bracket
Air flow
50mm
At least 50mm
Base Outdoor unit base
50mm
4m 0.5m
Note: When 2 outdoor units need to be stacked,
5# angle steel can be used as the support.
When more than 3 outdoor units need to be
stacked, 6.5# channel steel should be used as the
support.
( )
( )
° °
Air conditioning outlet
Air conditioning copper pipe interfaceAir conditioning side outlet
Air conditioning down outlet
②
③
④
①
+ -Batt2
+ -Batt1
RS485
RS485
W12CK-BATT2+
W12CK-BATT1+
W12
W12CK-BATT1-
CK-BATT2-
W12
D+D-W12
W12
To GFSU-COM6
Brown
Yellow-green
2L
2N
PE
Blue
M5
2L
2N
PE
Brown
Yellow-green
Blue
M5 Vertiv air conditioning compressor power cord
3x2.5mm^2
3x2.5mm^2 3N
PE
3L3L
3N
PE
Vertiv air conditioner fan power cord
Vertiv air conditioning compressor communication line
24AWG 8-core CAT5 twisted pair
3 turns around the magnetic ring
Brown
Yellow-green
Blue
M5
Brown
Yellow-green
Blue
M5
N
PE
L
N
PE
L
Envicool air conditioning compressor power cord
3x2.5mm^2
PE PE
3x2.5mm^2N N
L L
Envicool air conditioning compressor power cord
B B
A A
Envicool air conditioning compressor communication line
2× 0.5mm2
Twisted pair shielded wire
Brown
Yellow-green
Blue
Brown
Yellow-green
Blue
Brown
Yellow-green
Blue
Brown
Yellow-green
Blue
Black
Brown
Air conditioner power cord W09
Outdoor fan power supply wire AW02
Outdoor compressor power supply AW02
Outdoor compressor communication line AW03
The AC power cable of the indoor unit of the air
conditioner and the routing path of the RS485
communication cable with GFSU power and
environment monitoring communication
A.C.-485
Equipment cabinet 1
Equipment cabinet 1
W08
Equipment cabinet 2
Equipment cabinet 2
(Optional)
W13
A.C.-485
A.C.-485
A.C.-485
dzs
dzs
dzs
dzs
X1
(Optional)
DC48V
DC48V
W04
W03
W03
X2
X2
X3
W03X3
X1
A.C.-485
DC48V
X3
DC48V
X1
X1
X2
X2
X3
X3
X2
X1
A.C.-485
DC48V
W08
dzs
DC48V
X3
X2
X1
dzs
(Optional)
dzs
dzs
dzs
A.C.-485
A.C.-485
A.C.-485
dzs
W13
Power cabinet
(Optional)
DC48V
DC48V
X1
W03X1
W01
X3W03
X3
X2
X2
W03
A.C.-485
X3
X2
DC48V
X1
DC48V
Power cabinet
W14 Camera1-12V
(Optional)
12V2
12V2
12V2
12V2
12V2
12V2 Camera1-12V
12V2
12V2
W14
(Optional)
Power cabinet Equipment cabinet 1 Equipment cabinet 2
保护指示灯(黄色)
电源指示灯(绿色)
故障指示灯(红色)
电源指示灯(绿色)
保护指示灯(黄色)
故障指示灯(红色)
Power indicator (green)
Protection indicator (yellow)
Fault indicator (red)