PT Krakatau Steel (Persero) Tbk dan entitas anaknya/and its ...
company profile - pt waskita karya (persero) tbk
-
Upload
khangminh22 -
Category
Documents
-
view
5 -
download
0
Transcript of company profile - pt waskita karya (persero) tbk
6
WASKITA GROUP CORPORATE STRUCTURE
59,99%
PT Waskita Beton Precast Tbk
99,99%
PT Waskita Karya Realty
80,56%
PT Waskita Toll Road
20,00%
PT Prima Multi Terminal
90,00%
PT Cimanggis Cibitung Tollways
PT Cinere Serpong Jaya
25,00%
PT Citra Waspphutowa
94,70%
PT Waskita Karya Infrastruktur
99,99%
PT Waskita Sangir PT Waskita Wado Energi Energi
99,99%
77,69%99,99%
PT Pejagan Pemalang Tol Road
99,99%
PT Semesta Marga Raya
PT Trans-Jawa Paspro Jalan-Tol
22,31%
39,50%
60,00%
Batang Tol Road
PT Trans Jabar Tol
99,99%
PT Waskita Bumi Wira
99,90%98,18%
PT Waskita Sriwijaya Tol
60,00%
PT Tol Teluk PT PemalangBalikpapan
75,00%
PT Waskita Bali
Mandara
55,00%
PT Cibitung Tanjung Priok Port Tollways
99,70%
PT Kresna Kusuma
Dyandra Marga
PT Waskita Modern Realti
60,00%
30.00%
PT Jasa Marga Kualanamu Toll
35,00%
PT Jasamarga Semarang Batang
40,00% 30.00%
PT Hutama Marga Waskita
PT Citra Karya Jabar Tol
15,00%
PT Waskita Fim Perkasa Realti
60,00%
PT Hotel Karya Indonesia
25,00%
PT PP Sinergi Banjaratma
20,00%
Pemerintah
66,04%
PT Waskita Karya (Persero) Tbk
Masyarakat
33,96%
Owner PT Kresna Kusuma Dyandra MargaProject Location East Jakarta, IndonesiaProject Value Rp..385.035.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 174.106.000.000,- (Incl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 28 November 2014 – 27 November 2017Actual Duration (Incld.Addendum) 28 November 2014 – 29 May 2018
Scope Of Works
1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Balanced Cantilever
8
PROJECT EXPERIENCE
TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 1 A
Owner PT Kresna Kusuma Dyandra MargaProject Location East Jakarta, IndonesiaProject Value Rp. 899.441.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.149.305.000.000,- (Incl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 28 November 2014 – 27 November 2017Actual Duration (Incld.Addendum) 28 November 2014 – 29 May 2018
Scope Of Works
1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder
8
PROJECT EXPERIENCE
2 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 1 BC
Owner PT Kresna Kusuma Dyandra MargaProject Location Bekasi, IndonesiaProject Value Rp. 891.494.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.054.135.020.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 30 Oktober 2017 – 23 April 2019Actual Duration (Incld.Addendum) 30 Oktober 2017 – 28 Februari 2021
Scope Of Works
1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder
8
PROJECT EXPERIENCE
3 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 2 A
Owner PT Kresna Kusuma Dyandra MargaProject Location Bekasi, IndonesiaProject Value Rp. 891.494.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.054.135.020.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 11 February 2019 – 09 September 2019Actual Duration (Incld.Addendum) 11 February 2019 – 17 June 2021
Scope Of Works
1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder
8
PROJECT EXPERIENCE
4 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 2 A UJUNG
Owner PT Kresna Kusuma Dyandra MargaProject Location Bekasi, IndonesiaProject Value Rp. 421.656.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 449.294.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 05 December 2017 – 29 May 2019Actual Duration (Incld.Addendum) 05 December 2017 – 30 April 2021
Scope Of Works
1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder
8
PROJECT EXPERIENCE
5 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) KONEKSI WIYOTO WIYONO
Owner PT Solo Ngawi JayaProject Location Surakarta, Central Java, IndonesiaProject Value Rp. 4.018.770.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.966.901.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 09 September 2015 – 12 July 2017Actual Duration (Incld.Addendum) 09 September 2015 – 31 December 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
6 TOL SOLO NGAWI
Owner PT Solo Ngawi JayaProject Location Ngawi, East Java, IndonesiaProject Value Rp. 1.483.006.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.739.023.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 09 September 2015 – 21 July 2017Actual Duration (Incld.Addendum) 09 September 2015 – 18 November 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
7 TOL NGAWI KERTOSONO
Owner PT JSNProject Location Ngawi, East Java, IndonesiaProject Value Rp. 2.638.274.000.000,-(Excl.VAT)Contract Value (Incld.Addendum) Rp. 2.638.274.000.000,-(Excl.VAT)Contract Scheme Unit PriceDuration as Contract 28 December 2016 – 30 November 2018Actual Duration (Incld.Addendum) 28 December 2016 – 30 November 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
8 TOL SALATIGA KARTASURA
Owner PT Pejagan Pemalang Toll RoadProject Location Tegal, Central Java, IndonesiaProject Value Rp. 3.003.471.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.089.512.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 21 December 2015 – 21 July 2017Actual Duration (Incld.Addendum) 21 December 2015 – 18 November 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
9 TOL PEJAGAN PEMALANG
Owner PT Pemalang Batang Toll RoadProject Location Pemalang, Central Java, IndonesiaProject Value Rp. 2.347.377.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.159.075.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 31 March 2016 – 04 April 2018Actual Duration (Incld.Addendum) 31 March 2016 – 17 November 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
10 TOL PEMALANG BATANG
Owner PT Jasa Marga Semarang BatangProject Location Batang, Central Java, IndonesiaProject Value Rp. 6.422.752.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 13.769.419.000.000,- (Incl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 25 July 2016 – 04 April 2018Actual Duration (Incld.Addendum) 25 July 2016 – 06 December 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
11 TOL BATANG SEMARANG
Owner PT Trans Marga JatengProject Location Semarang, Central Java, IndonesiaProject Value Seksi 2 : Rp. 403.000.000.000,-(Incl.VAT)
Seksi 3 : Rp. 158.706.011.600,-(Incl.VAT)Seksi 6 : Rp. 241.126.992.526,-(Incl.VAT)
Contract Scheme Unit PriceDuration as Contract 10 August 2011 – 30 Desember 2013Actual Duration (Incld.Addendum) 10 August 2011 – 30 Desember 2013
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Box Balanced Cantilever
8
PROJECT EXPERIENCE
12 TOL SEMARANG - BAWEN
Owner PT Jasa Marga Jalan Layang CikampekProject Location Jakarta, IndonesiaProject Value Rp. 6.900.700.860.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 6.900.700.860.000,-(Incl.VAT)Contract Scheme Lump SumpDuration as Contract 27 February 2017 – 27 March 2019Actual Duration (Incld.Addendum) 27 February 2017 – 26 September 2019
Scope Of Works
1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder / Steel Girder
8
PROJECT EXPERIENCE
13 TOL JAKARTA CIKAMPEK II ELEVATED
Owner PT Cimanggis Cibitung TollwaysProject Location Bogor, West Java, IndonesiaProject Value Rp. 4.607.536.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.637.390.000.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 25 September 2015– 17 July 2018Actual Duration (Incld.Addendum) 25 September 2015– 21 September 2021
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
14 TOL CIMANGGIS CIBITUNG
Owner PT Trans Jabar TolProject Location Sukabumi, West Java, IndonesiaProject Value Rp. 2.552.927.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 3.284.798.000.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 30 June 2016 – 17 July 2018Actual Duration (Incld.Addendum) 30 June 2016 – 18 July 2021
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
15 TOL CIAWI SUKABUMI
Owner PT Marga Trans NusantaraProject Location Kunciran, Banten, IndonesiaProject Value Rp. 1.239.236.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.695.996.000.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 15 May 2017 – 17 July 2018Actual Duration (Incld.Addendum) 15 May 2017 – 14 January 2020
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
16 TOL JOR II PAKET 1 KUNCIRAN PARIGI
Owner PT Hutama KaryaProject Location Lampung, IndonesiaProject Value Rp. 2.690.441.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 2.812.380.780.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 29 December 2015 – 22 December 2017Actual Duration (Incld.Addendum) 29 December 2015 – 30 November 2018
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
17 TOL BAKAUHENI – TERBANGGI BESAR PAKET 2 (SIDOMULYO – KOTABARU)
Owner PT Jasa Marga Semarang BatangProject Location Lampung Tengah, IndonesiaProject Value Rp. 2.517.589.500.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 2.930.519.800.000,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 25 July 2016 – 26 September 2018Actual Duration (Incld.Addendum) 25 July 2016 – 22 February 2019
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
18 TOL TERBANGGI BESAR – PEMATANG PANGGANG (VGF JASA MARGA SEMARANG BATANG)
Owner PT Waskita Bumi WiraProject Location Lampung Tengah, IndonesiaProject Value Rp. 2.393.148.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 2.496.986.000.000,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 09 December 2016 – 12 December 2018Actual Duration (Incld.Addendum) 09 December 2016 – 19 May 2019
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
19 TOL TERBANGGI BESAR – PEMATANG PANGGANG (VGF KRIAN LEGUNDI BUNDER)
Owner PT Hutama KaryaProject Location Lampung Tengah, IndonesiaProject Value Rp. 13.166.192.182.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 12.914.890.365.947,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 25 July 2016 – 08 August 2018Actual Duration (Incld.Addendum) 25 July 2016 – 30 March 2020
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
20 TOL TERBANGGI BESAR – PEMATANG PANGGANG – KAYU AGUNG
Owner PT Jasamarga Japek SelatanProject Location Lampung Tengah, IndonesiaProject Value Rp. 2.023.038.454.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.774.454.078.000,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 14 September 2018– 01 April 2019Actual Duration (Incld.Addendum) 14 September 2018 – 31 October 2019
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
21 TOL TERBANGGI BESAR – PEMATANG PANGGANG (VGF JAPEK SELATAN)
Owner PT Waskita Sriwijaya TolProject Location Palembang, IndonesiaProject Value Rp. 1.256.862.827.600,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.089.017.601.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 02 June 2017 – 31 March 2020Actual Duration (Incld.Addendum) 02 June 2017 – 30 April 2020
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
22 TOL KAPB PAKET I SEKSI 1A
Owner PT Waskita Sriwijaya TolProject Location Palembang, IndonesiaProject Value Rp. 5.345.095.157.600,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 7.637.217.668.300,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 30 May 2016 – 22 April 2020Actual Duration (Incld.Addendum) 30 May 2016 – 31 March 2021
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
23 TOL KAPB PAKET II SEKSI 2
Owner PT Jasamarga Kualanamu TolProject Location Medan, North Sumatra, IndonesiaProject Value Rp. 439.754.930.330,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 534.248.168.808,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 18 June 2015 – 15 October 2016Actual Duration (Incld.Addendum) 18 June 2015 – 19 July 2017
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
24 TOL MEDAN – KUALANAMU - TEBING TINGGI SEKSI 3 (PARBARAKAN – LUBUK PAKAM)
Owner PT Jasamarga Kualanamu TolProject Location Medan, North Sumatra, IndonesiaProject Value Rp. 480.407.710.900,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 439.738.668.300,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 21 October 2015 – 9 April 2017Actual Duration (Incld.Addendum) 18 June 2015 – 19 July 2017
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
25 TOL MEDAN – KUALANAMU - TEBING TINGGI SEKSI 4A (LUBUK PAKAM – ADOLINA)
Owner PT Jasamarga Kualanamu TolProject Location Medan, North Sumatra, IndonesiaProject Value Rp. 554.242.299.700,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 539.825.394.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 18 June 2015 – 29 May 2017Actual Duration (Incld.Addendum) 18 June 2015 – 31 July 2017
Scope Of Works
1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate
8
PROJECT EXPERIENCE
26 TOL MEDAN – KUALANAMU - TEBING TINGGI SEKSI 6 (TELUK MENGKUDU – SEI RAMPAH)
Owner PT Jasamarga Bali TolProject Location Bali, IndonesiaProject Value Rp. 773.384.423.102,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 773.384.423.102,-(Incl.VAT)Contract Scheme Lump SumpDuration as Contract 01 March 2012 – 25 April 2013Actual Duration (Incld.Addendum) 01 March 2012 – 25 April 2013
Scope Of Works
1. DED2. Civil Works Pilling Works Precast Full Slab Erection PC I Girder Mechanical & Electrical
8
PROJECT EXPERIENCE
27 TOL NUSA DUA – NGURAH RAI - BENOA
Owner Kementerian PUPRProject Location Ambon, Maluku, IndonesiaProject Value Rp. 458.131.260.000,- (Incl.VAT)Contract Value (Incld.Addendum) Rp. 458.131.260.000,- (Incl.VAT)Contract Scheme Multi Years ContractDuration as Contract 17 July 2012 – 19 December 2015Actual Duration (Incld.Addendum) 17 July 2012 – 04 April 2016
Scope Of Works
Civil Works Bored Pile and Dewatering Pilecap and Pier Steel Deck Pylon Cable Approach Bridge
8
PROJECT EXPERIENCE
28 JEMBATAN MERAH PUTIH
Owner Kementerian PUPRProject Location Surabaya – Madura , IndonesiaProject Value USD 41.130.394,-,- + Rp. 341.294.013.020,- (Incl. VAT) Contract Value (Incld.Addendum) USD 41.130.394,-,- + Rp. 341.294.013.020,- (Incl. VAT) Contract Scheme Multi Years ContractDuration as Contract 29 November 2004 – 29 November 2006 Actual Duration (Incld.Addendum) 29 November 2004 – 01 March 2009
Scope Of Works
Engineering StudiesCivil Works Bored Pile and Dewatering Pilecap and Pier Asphalt Pavement Approach Bridge
8
PROJECT EXPERIENCE
29 JEMBATAN SURAMADU
Owner Kementerian PUPRProject Location Batam, IndonesiaProject Value Rp. 43.200.000.000,- (Incl. VAT) Contract Value (Incld.Addendum) Rp. 43.200.000.000,- (Incl. VAT) Contract Scheme Unit PriceDuration as Contract 23 September 1993 – 13 May 1997Actual Duration (Incld.Addendum) 23 September 1993 – 13 May 1997
Scope Of Works
Bored Pile and Dewatering Pilecap and Pier Balanced Cantilever Box Girder Haunched Girder
8
PROJECT EXPERIENCE
30 JEMBATAN BARELANG IV
Owner Kementerian Perhubungan
Project Location Palembang, South Sumatra, Indonesia
Project Value Rp. 443.049.000.000,- (Incl.VAT)
Contract Value (Incld.Addendum) Rp. 443.049.000.000,- (Incl.VAT)
Contract Scheme Lump Sump
Duration as Contract 30 Juni 2016 – 23 April 2019
Actual Duration (Incld.Addendum) 30 Juni 2016 – 23 April 2019
Scope Of Works
Civil Works Bored Pile and Dewatering Pilecap and Pier Erection Steel Girder Rail
8
PROJECT EXPERIENCE
31 JEMBATAN LRT PALEMBANG
Owner Dinas PU DKI
Project Location Jakarta, Indonesia
Project Value Rp. 245.147.226.779,- (Excl.VAT)
Contract Value (Incld.Addendum) Rp. 245.147.226.779,- (Excl.VAT)
Contract Scheme Fixed Unit Price
Duration as Contract November 2010 – July 2012
Actual Duration (Incld.Addendum) November 2010 – July 2012
Scope Of Works
Civil Works Bored Pile Pilecap & Pier Single Box Girder Moving Launching Gantry for Segmental Girder
8
PROJECT EXPERIENCE
32 JALAN LAYANG NON TOL ANTASARI
MailingAddress: Head Office WaskitaBuildingJl, MT, Haryono Kav, No.10 Cawang, Jakarta13340Ph: (+6221)8508510/20 E-mail: [email protected] website:www.waskita.co.id
Disclaimer:This material Rev by Rady is for information only, and we are not soliciting any action based upon it, This report is not to be construed as an offer to sell or the solicitation of an offer to buy anysecurity in any jurisdiction where such an offer or solicitation would be illegal, The information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurateor complete, and it should not be relied upon as such, Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice, It is intended forthe use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PTWaskita Karya (Persero)Tbk.