company profile - pt waskita karya (persero) tbk

40
COMPANY PROFILE PT WASKITA KARYA (PERSERO) TBK

Transcript of company profile - pt waskita karya (persero) tbk

COMPANY PROFILEPT WASKITA KARYA (PERSERO) TBK

COMPANIES OVERVIEW

CORPORATE MANAGEMENT STRUCTURE

BUSINESS LINE

6

WASKITA GROUP CORPORATE STRUCTURE

59,99%

PT Waskita Beton Precast Tbk

99,99%

PT Waskita Karya Realty

80,56%

PT Waskita Toll Road

20,00%

PT Prima Multi Terminal

90,00%

PT Cimanggis Cibitung Tollways

PT Cinere Serpong Jaya

25,00%

PT Citra Waspphutowa

94,70%

PT Waskita Karya Infrastruktur

99,99%

PT Waskita Sangir PT Waskita Wado Energi Energi

99,99%

77,69%99,99%

PT Pejagan Pemalang Tol Road

99,99%

PT Semesta Marga Raya

PT Trans-Jawa Paspro Jalan-Tol

22,31%

39,50%

60,00%

Batang Tol Road

PT Trans Jabar Tol

99,99%

PT Waskita Bumi Wira

99,90%98,18%

PT Waskita Sriwijaya Tol

60,00%

PT Tol Teluk PT PemalangBalikpapan

75,00%

PT Waskita Bali

Mandara

55,00%

PT Cibitung Tanjung Priok Port Tollways

99,70%

PT Kresna Kusuma

Dyandra Marga

PT Waskita Modern Realti

60,00%

30.00%

PT Jasa Marga Kualanamu Toll

35,00%

PT Jasamarga Semarang Batang

40,00% 30.00%

PT Hutama Marga Waskita

PT Citra Karya Jabar Tol

15,00%

PT Waskita Fim Perkasa Realti

60,00%

PT Hotel Karya Indonesia

25,00%

PT PP Sinergi Banjaratma

20,00%

Pemerintah

66,04%

PT Waskita Karya (Persero) Tbk

Masyarakat

33,96%

OPERATING AREAS & EXPERTISE

INFRASTRUCTURE IIPORTFOLIO

Owner PT Kresna Kusuma Dyandra MargaProject Location East Jakarta, IndonesiaProject Value Rp..385.035.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 174.106.000.000,- (Incl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 28 November 2014 – 27 November 2017Actual Duration (Incld.Addendum) 28 November 2014 – 29 May 2018

Scope Of Works

1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Balanced Cantilever

8

PROJECT EXPERIENCE

TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 1 A

Owner PT Kresna Kusuma Dyandra MargaProject Location East Jakarta, IndonesiaProject Value Rp. 899.441.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.149.305.000.000,- (Incl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 28 November 2014 – 27 November 2017Actual Duration (Incld.Addendum) 28 November 2014 – 29 May 2018

Scope Of Works

1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder

8

PROJECT EXPERIENCE

2 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 1 BC

Owner PT Kresna Kusuma Dyandra MargaProject Location Bekasi, IndonesiaProject Value Rp. 891.494.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.054.135.020.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 30 Oktober 2017 – 23 April 2019Actual Duration (Incld.Addendum) 30 Oktober 2017 – 28 Februari 2021

Scope Of Works

1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder

8

PROJECT EXPERIENCE

3 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 2 A

Owner PT Kresna Kusuma Dyandra MargaProject Location Bekasi, IndonesiaProject Value Rp. 891.494.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.054.135.020.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 11 February 2019 – 09 September 2019Actual Duration (Incld.Addendum) 11 February 2019 – 17 June 2021

Scope Of Works

1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder

8

PROJECT EXPERIENCE

4 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) SEKSI 2 A UJUNG

Owner PT Kresna Kusuma Dyandra MargaProject Location Bekasi, IndonesiaProject Value Rp. 421.656.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 449.294.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 05 December 2017 – 29 May 2019Actual Duration (Incld.Addendum) 05 December 2017 – 30 April 2021

Scope Of Works

1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder

8

PROJECT EXPERIENCE

5 TOL BEKASI – CAWANG – KAMPUNG MELAYU (BECAKAYU) KONEKSI WIYOTO WIYONO

Owner PT Solo Ngawi JayaProject Location Surakarta, Central Java, IndonesiaProject Value Rp. 4.018.770.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.966.901.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 09 September 2015 – 12 July 2017Actual Duration (Incld.Addendum) 09 September 2015 – 31 December 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

6 TOL SOLO NGAWI

Owner PT Solo Ngawi JayaProject Location Ngawi, East Java, IndonesiaProject Value Rp. 1.483.006.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.739.023.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 09 September 2015 – 21 July 2017Actual Duration (Incld.Addendum) 09 September 2015 – 18 November 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

7 TOL NGAWI KERTOSONO

Owner PT JSNProject Location Ngawi, East Java, IndonesiaProject Value Rp. 2.638.274.000.000,-(Excl.VAT)Contract Value (Incld.Addendum) Rp. 2.638.274.000.000,-(Excl.VAT)Contract Scheme Unit PriceDuration as Contract 28 December 2016 – 30 November 2018Actual Duration (Incld.Addendum) 28 December 2016 – 30 November 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

8 TOL SALATIGA KARTASURA

Owner PT Pejagan Pemalang Toll RoadProject Location Tegal, Central Java, IndonesiaProject Value Rp. 3.003.471.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.089.512.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 21 December 2015 – 21 July 2017Actual Duration (Incld.Addendum) 21 December 2015 – 18 November 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

9 TOL PEJAGAN PEMALANG

Owner PT Pemalang Batang Toll RoadProject Location Pemalang, Central Java, IndonesiaProject Value Rp. 2.347.377.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.159.075.000.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 31 March 2016 – 04 April 2018Actual Duration (Incld.Addendum) 31 March 2016 – 17 November 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

10 TOL PEMALANG BATANG

Owner PT Jasa Marga Semarang BatangProject Location Batang, Central Java, IndonesiaProject Value Rp. 6.422.752.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 13.769.419.000.000,- (Incl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 25 July 2016 – 04 April 2018Actual Duration (Incld.Addendum) 25 July 2016 – 06 December 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

11 TOL BATANG SEMARANG

Owner PT Trans Marga JatengProject Location Semarang, Central Java, IndonesiaProject Value Seksi 2 : Rp. 403.000.000.000,-(Incl.VAT)

Seksi 3 : Rp. 158.706.011.600,-(Incl.VAT)Seksi 6 : Rp. 241.126.992.526,-(Incl.VAT)

Contract Scheme Unit PriceDuration as Contract 10 August 2011 – 30 Desember 2013Actual Duration (Incld.Addendum) 10 August 2011 – 30 Desember 2013

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Box Balanced Cantilever

8

PROJECT EXPERIENCE

12 TOL SEMARANG - BAWEN

Owner PT Jasa Marga Jalan Layang CikampekProject Location Jakarta, IndonesiaProject Value Rp. 6.900.700.860.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 6.900.700.860.000,-(Incl.VAT)Contract Scheme Lump SumpDuration as Contract 27 February 2017 – 27 March 2019Actual Duration (Incld.Addendum) 27 February 2017 – 26 September 2019

Scope Of Works

1. DED2. Civil Works Bored Pile Pilecap Column Pier Head Erection PC-I Girder / Steel Girder

8

PROJECT EXPERIENCE

13 TOL JAKARTA CIKAMPEK II ELEVATED

Owner PT Cimanggis Cibitung TollwaysProject Location Bogor, West Java, IndonesiaProject Value Rp. 4.607.536.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 4.637.390.000.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 25 September 2015– 17 July 2018Actual Duration (Incld.Addendum) 25 September 2015– 21 September 2021

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

14 TOL CIMANGGIS CIBITUNG

Owner PT Trans Jabar TolProject Location Sukabumi, West Java, IndonesiaProject Value Rp. 2.552.927.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 3.284.798.000.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 30 June 2016 – 17 July 2018Actual Duration (Incld.Addendum) 30 June 2016 – 18 July 2021

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

15 TOL CIAWI SUKABUMI

Owner PT Marga Trans NusantaraProject Location Kunciran, Banten, IndonesiaProject Value Rp. 1.239.236.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.695.996.000.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 15 May 2017 – 17 July 2018Actual Duration (Incld.Addendum) 15 May 2017 – 14 January 2020

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

16 TOL JOR II PAKET 1 KUNCIRAN PARIGI

Owner PT Hutama KaryaProject Location Lampung, IndonesiaProject Value Rp. 2.690.441.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 2.812.380.780.000,- (Incl.VAT)Contract Scheme Fixed Unit PriceDuration as Contract 29 December 2015 – 22 December 2017Actual Duration (Incld.Addendum) 29 December 2015 – 30 November 2018

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

17 TOL BAKAUHENI – TERBANGGI BESAR PAKET 2 (SIDOMULYO – KOTABARU)

Owner PT Jasa Marga Semarang BatangProject Location Lampung Tengah, IndonesiaProject Value Rp. 2.517.589.500.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 2.930.519.800.000,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 25 July 2016 – 26 September 2018Actual Duration (Incld.Addendum) 25 July 2016 – 22 February 2019

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

18 TOL TERBANGGI BESAR – PEMATANG PANGGANG (VGF JASA MARGA SEMARANG BATANG)

Owner PT Waskita Bumi WiraProject Location Lampung Tengah, IndonesiaProject Value Rp. 2.393.148.000.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 2.496.986.000.000,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 09 December 2016 – 12 December 2018Actual Duration (Incld.Addendum) 09 December 2016 – 19 May 2019

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

19 TOL TERBANGGI BESAR – PEMATANG PANGGANG (VGF KRIAN LEGUNDI BUNDER)

Owner PT Hutama KaryaProject Location Lampung Tengah, IndonesiaProject Value Rp. 13.166.192.182.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 12.914.890.365.947,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 25 July 2016 – 08 August 2018Actual Duration (Incld.Addendum) 25 July 2016 – 30 March 2020

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

20 TOL TERBANGGI BESAR – PEMATANG PANGGANG – KAYU AGUNG

Owner PT Jasamarga Japek SelatanProject Location Lampung Tengah, IndonesiaProject Value Rp. 2.023.038.454.000,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.774.454.078.000,- (Incl.VAT)Contract Scheme Lumpsump Fixed PriceDuration as Contract 14 September 2018– 01 April 2019Actual Duration (Incld.Addendum) 14 September 2018 – 31 October 2019

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

21 TOL TERBANGGI BESAR – PEMATANG PANGGANG (VGF JAPEK SELATAN)

Owner PT Waskita Sriwijaya TolProject Location Palembang, IndonesiaProject Value Rp. 1.256.862.827.600,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 1.089.017.601.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 02 June 2017 – 31 March 2020Actual Duration (Incld.Addendum) 02 June 2017 – 30 April 2020

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

22 TOL KAPB PAKET I SEKSI 1A

Owner PT Waskita Sriwijaya TolProject Location Palembang, IndonesiaProject Value Rp. 5.345.095.157.600,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 7.637.217.668.300,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 30 May 2016 – 22 April 2020Actual Duration (Incld.Addendum) 30 May 2016 – 31 March 2021

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

23 TOL KAPB PAKET II SEKSI 2

Owner PT Jasamarga Kualanamu TolProject Location Medan, North Sumatra, IndonesiaProject Value Rp. 439.754.930.330,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 534.248.168.808,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 18 June 2015 – 15 October 2016Actual Duration (Incld.Addendum) 18 June 2015 – 19 July 2017

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

24 TOL MEDAN – KUALANAMU - TEBING TINGGI SEKSI 3 (PARBARAKAN – LUBUK PAKAM)

Owner PT Jasamarga Kualanamu TolProject Location Medan, North Sumatra, IndonesiaProject Value Rp. 480.407.710.900,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 439.738.668.300,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 21 October 2015 – 9 April 2017Actual Duration (Incld.Addendum) 18 June 2015 – 19 July 2017

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

25 TOL MEDAN – KUALANAMU - TEBING TINGGI SEKSI 4A (LUBUK PAKAM – ADOLINA)

Owner PT Jasamarga Kualanamu TolProject Location Medan, North Sumatra, IndonesiaProject Value Rp. 554.242.299.700,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 539.825.394.000,- (Incl.VAT)Contract Scheme Unit PriceDuration as Contract 18 June 2015 – 29 May 2017Actual Duration (Incld.Addendum) 18 June 2015 – 31 July 2017

Scope Of Works

1. DED2. Civil Works Earthworks Pilling Works Agregate Foundation Works Concrete Pavement Works Bridge (Interchange, Underbridge, Overbridge) Toll Gate

8

PROJECT EXPERIENCE

26 TOL MEDAN – KUALANAMU - TEBING TINGGI SEKSI 6 (TELUK MENGKUDU – SEI RAMPAH)

Owner PT Jasamarga Bali TolProject Location Bali, IndonesiaProject Value Rp. 773.384.423.102,-(Incl.VAT)Contract Value (Incld.Addendum) Rp. 773.384.423.102,-(Incl.VAT)Contract Scheme Lump SumpDuration as Contract 01 March 2012 – 25 April 2013Actual Duration (Incld.Addendum) 01 March 2012 – 25 April 2013

Scope Of Works

1. DED2. Civil Works Pilling Works Precast Full Slab Erection PC I Girder Mechanical & Electrical

8

PROJECT EXPERIENCE

27 TOL NUSA DUA – NGURAH RAI - BENOA

Owner Kementerian PUPRProject Location Ambon, Maluku, IndonesiaProject Value Rp. 458.131.260.000,- (Incl.VAT)Contract Value (Incld.Addendum) Rp. 458.131.260.000,- (Incl.VAT)Contract Scheme Multi Years ContractDuration as Contract 17 July 2012 – 19 December 2015Actual Duration (Incld.Addendum) 17 July 2012 – 04 April 2016

Scope Of Works

Civil Works Bored Pile and Dewatering Pilecap and Pier Steel Deck Pylon Cable Approach Bridge

8

PROJECT EXPERIENCE

28 JEMBATAN MERAH PUTIH

Owner Kementerian PUPRProject Location Surabaya – Madura , IndonesiaProject Value USD 41.130.394,-,- + Rp. 341.294.013.020,- (Incl. VAT) Contract Value (Incld.Addendum) USD 41.130.394,-,- + Rp. 341.294.013.020,- (Incl. VAT) Contract Scheme Multi Years ContractDuration as Contract 29 November 2004 – 29 November 2006 Actual Duration (Incld.Addendum) 29 November 2004 – 01 March 2009

Scope Of Works

Engineering StudiesCivil Works Bored Pile and Dewatering Pilecap and Pier Asphalt Pavement Approach Bridge

8

PROJECT EXPERIENCE

29 JEMBATAN SURAMADU

Owner Kementerian PUPRProject Location Batam, IndonesiaProject Value Rp. 43.200.000.000,- (Incl. VAT) Contract Value (Incld.Addendum) Rp. 43.200.000.000,- (Incl. VAT) Contract Scheme Unit PriceDuration as Contract 23 September 1993 – 13 May 1997Actual Duration (Incld.Addendum) 23 September 1993 – 13 May 1997

Scope Of Works

Bored Pile and Dewatering Pilecap and Pier Balanced Cantilever Box Girder Haunched Girder

8

PROJECT EXPERIENCE

30 JEMBATAN BARELANG IV

Owner Kementerian Perhubungan

Project Location Palembang, South Sumatra, Indonesia

Project Value Rp. 443.049.000.000,- (Incl.VAT)

Contract Value (Incld.Addendum) Rp. 443.049.000.000,- (Incl.VAT)

Contract Scheme Lump Sump

Duration as Contract 30 Juni 2016 – 23 April 2019

Actual Duration (Incld.Addendum) 30 Juni 2016 – 23 April 2019

Scope Of Works

Civil Works Bored Pile and Dewatering Pilecap and Pier Erection Steel Girder Rail

8

PROJECT EXPERIENCE

31 JEMBATAN LRT PALEMBANG

Owner Dinas PU DKI

Project Location Jakarta, Indonesia

Project Value Rp. 245.147.226.779,- (Excl.VAT)

Contract Value (Incld.Addendum) Rp. 245.147.226.779,- (Excl.VAT)

Contract Scheme Fixed Unit Price

Duration as Contract November 2010 – July 2012

Actual Duration (Incld.Addendum) November 2010 – July 2012

Scope Of Works

Civil Works Bored Pile Pilecap & Pier Single Box Girder Moving Launching Gantry for Segmental Girder

8

PROJECT EXPERIENCE

32 JALAN LAYANG NON TOL ANTASARI

MailingAddress: Head Office WaskitaBuildingJl, MT, Haryono Kav, No.10 Cawang, Jakarta13340Ph: (+6221)8508510/20 E-mail: [email protected] website:www.waskita.co.id

Disclaimer:This material Rev by Rady is for information only, and we are not soliciting any action based upon it, This report is not to be construed as an offer to sell or the solicitation of an offer to buy anysecurity in any jurisdiction where such an offer or solicitation would be illegal, The information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurateor complete, and it should not be relied upon as such, Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice, It is intended forthe use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PTWaskita Karya (Persero)Tbk.