Bubble Diagrams Bubble Diagrams

26
Bubble Diagrams Bubble Diagrams 1

Transcript of Bubble Diagrams Bubble Diagrams

Bubble DiagramsBubble Diagrams

1

Why have them?

They play an important role in design practice. Diagrams are drawn to explore ideas and sol tions in the earl concept alideas and solutions in the early, conceptual phases of design. They are used to help designers think about design parametersdesigners think about design parameters and are a fast way to record their ideas. Good designers find it hard to "think without ga pencil" and "must interact with the drawing".

TermsTerms

• Bubble diagram– Graphic means of organizing spaces within a design

• BubbleRound or elliptical shape representing one space within– Round or elliptical shape representing one space within a design that is drawn showing its location and proportional size

3

Steps in using bubble diagramsSteps in using bubble diagrams1. List functions to be performed (ex: museum)

i d i i i d i l ifstorage, operations, administration, educational, gift shop, exhibits, prep areas, café, staff area, children’s area, public restrooms

2. Rank functions according to size allocation (approximate square footage)allocation (approximate square footage)

exhibits storagestorage operations, administration educational children’s areas

4

public restrooms, prep area, staff areacafé, gift shop

3. Taking circulation gbetween spaces into consideration, d b bbldraw bubbles (drawn to

ti lproportional relationship)

5

4. Evaluate placement of bubbles using4. Evaluate placement of bubbles using design parameters

6

5. Using overlays, rearrange bubbles until best layout is achieved thatachieved that satisfies design parametersparameters

7

6. From final bubble diagram create a li i d ipreliminary design

Further develop preliminary floor planFurther develop preliminary floor plan

9

• Evaluation must include circulation and spatial positionsEvaluation must include circulation and spatial positions

10

SourcesSources• http://expert.cc.purdue.edu/~wishmeie/sketches.htm• http://www1.inetba.com/srbassociates/spacepl.ivnu

11

LEED for New Construction and Major Renovation 2009Project Scorecard

Project Name:Project Address:

Yes ? No

Sustainable Sites 26 Points

Y Prereq 1 Construction Activity Pollution Prevention RequiredCredit 1 Site Selection 1Credit 2 Development Density & Community Connectivity 5Credit 3 Brownfield Redevelopment 1Credit 4.1 Alternative Transportation, Public Transportation Access 6Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 3Credit 4.4 Alternative Transportation, Parking Capacity 2Credit 5.1 Site Development, Protect or Restore Habitat 1Credit 5.2 Site Development, Maximize Open Space 1Credit 6.1 Stormwater Design, Quantity Control 1Credit 6.2 Stormwater Design, Quality Control 1Credit 7.1 Heat Island Effect, Non-Roof 1Credit 7.2 Heat Island Effect, Roof 1Credit 8 Light Pollution Reduction 1

Yes ? No

Water Efficiency 10 Points

Y Prereq 1 Water Use Reduction, 20% Reduction RequiredCredit 1.1 Water Efficient Landscaping, Reduce by 50% 2Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 2Credit 2 Innovative Wastewater Technologies 2Credit 3 Water Use Reduction 2 to 4

30% Reduction 235% Reduction 340% Reduction 4

Energy & Atmosphere 35 Points

Y Prereq 1 Fundamental Commissioning of the Building Energy Systems RequiredY Prereq 2 Minimum Energy Performance: 10% New Bldgs or 5% Existing Bldg Renovations RequiredY Prereq 3 Fundamental Refrigerant Management Required

Credit 1 Optimize Energy Performance 1 to 1912% New Buildings or 8% Existing Building Renovations 114% New Buildings or 10% Existing Building Renovations 216% New Buildings or 12% Existing Building Renovations 318% New Buildings or 14% Existing Building Renovations 420% New Buildings or 16% Existing Building Renovations 522% New Buildings or 18% Existing Building Renovations 624% New Buildings or 20% Existing Building Renovations 726% New Buildings or 22% Existing Building Renovations 828% New Buildings or 24% Existing Building Renovations 930% New Buildings or 26% Existing Building Renovations 1032% New Buildings or 28% Existing Building Renovations 1134% New Buildings or 30% Existing Building Renovations 1236% New Buildings or 32% Existing Building Renovations 1338% New Buildings or 34% Existing Building Renovations 1440% New Buildings or 36% Existing Building Renovations 1542% New Buildings or 38% Existing Building Renovations 1644% New Buildings or 40% Existing Building Renovations 1746% New Buildings or 42% Existing Building Renovations 1848% New Buildings or 44% Existing Building Renovations 19

Credit 2 On-Site Renewable Energy 1 to 71% Renewable Energy 13% Renewable Energy 25% Renewable Energy 37% Renewable Energy 49% Renewable Energy 511% Renewable Energy 613% Renewable Energy 7

Credit 3 Enhanced Commissioning 2Credit 4 Enhanced Refrigerant Management 2Credit 5 Measurement & Verification 3Credit 6 Green Power 2

Yes ? No

LEED for New Construction and Major Renovation 2009Project Scorecard

Project Name:Project Address:

Yes ? No

Materials & Resources 14 Points

Y Prereq 1 Storage & Collection of Recyclables RequiredCredit 1 Building Reuse 1 to 3Credit 1.1 Maintain 55% of Existing Walls, Floors & Roof 1Credit 1.2 Maintain 75% of Existing Walls, Floors & Roof 2Credit 1.3 Maintain 95% of Existing Walls, Floors & Roof 3Credit 1.4 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1Credit 3.1 Materials Reuse, 5% 1Credit 3.2 Materials Reuse, 10% 1Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally 1Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally 1Credit 6 Rapidly Renewable Materials 1Credit 7 Certified Wood 1

Yes ? No

Indoor Environmental Quality 15 Points

Y Prereq 1 Minimum IAQ Performance RequiredY Prereq 2 Environmental Tobacco Smoke (ETS) Control Required

Credit 1 Outdoor Air Delivery Monitoring 1Credit 2 Increased Ventilation 1Credit 3.1 Construction IAQ Management Plan, During Construction 1Credit 3 2 Construction IAQ Management Plan Before Occupancy 1Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1Credit 4.2 Low-Emitting Materials, Paints & Coatings 1Credit 4.3 Low-Emitting Materials, Flooring Systems 1Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1Credit 5 Indoor Chemical & Pollutant Source Control 1Credit 6.1 Controllability of Systems, Lighting 1Credit 6.2 Controllability of Systems, Thermal Comfort 1Credit 7.1 Thermal Comfort, Design 1Credit 7.2 Thermal Comfort, Verification 1Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1Credit 8.2 Daylight & Views, Views for 90% of Spaces 1

Yes ? No

Innovation & Design Process 6 Points

Credit 1.1 Innovation in Design: Provide Specific Title 1Credit 1.2 Innovation in Design: Provide Specific Title 1Credit 1.3 Innovation in Design: Provide Specific Title 1Credit 1.4 Innovation in Design: Provide Specific Title 1Credit 1.5 Innovation in Design: Provide Specific Title 1Credit 2 LEED® Accredited Professional 1

Yes ? No

Regional Priority Credits 4 Points

Credit 1.1 Regional Priority Credit: Region Defined 1Credit 1.2 Regional Priority Credit: Region Defined 1Credit 1.3 Regional Priority Credit: Region Defined 1Credit 1.4 Regional Priority Credit: Region Defined 1

Yes ? No

Project Totals (Certification Estimates) 110 PointsNot Certified Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points

Client Survey

Family InformationClients NamesAgesGenderPhysical DisabilitiesSpecial Physical needsPets (Number/Type/Size)

Architectural DetailHouse StyleAttic SpaceSquare FootageAmount of windows/TypesType of StairExterior Colors/TexturesExterior MaterialsInterior MaterialsClimate of SiteSecurity IssuesCeiling HeightSpecialized Lighting (Display Items)Fireplace

Work NeedsOccupation-1Occupation 2Work at Home? Y or NOffice neededSpecial needs in Office (i.e. furnisher, equipment, storage, work surface) Other Office Needspneeded?Office SizeCommunication systems

KitchenEat in spaceAppliances desiredPantryNumber of ovensPrep AreaStorageSpecial cooking required

BathroomNumber of Full BathsNumber of Half BathspBathrooms

Pleasure ActivitiesToysBoatsCampersHobbiesTrailersMotorcyclesATVShop Hobbiespneeds

OutdoorsLandscapingHot tubCabanaGarages

NeighborhoodHousing stylesValues ptypes?Soil conditionsGrading desires

UtilitiesType of heatingg gbudgetCentral VacuumAir ConditioningIntercomInternet (Bandwidth)CablePhoneEnergy Conservation

FinancialCostAvailable Mortgage

Future PlanningRentalChildrenElderly Parents

Building GreenMaking Buildings Healthy,Durable & Energy Efficient

Sustainable Living

Statement of the ProblemDesign, model and evaluate a residential home using Green Building techniques and materials

IDEAS * DEVELOPING * BUILDING * TESTING

EVALUATING * REDESIGN/REBUILD/RETEST

toSUCCESS

NAME:___________________________________________________________________________

TEAM MEMBERS:___________________________________________________________________

_________________________________________________________________________________

DATE STARTED:________________________ DATE DUE:________________________________

OVERALL ACTIVITY GRADE:__________

Requirements1. You will work in teams of two to four and design your green building and complete your design brief.2. This activity will be due _____________ . 3. Your completed brief is due _____________.4. Your presentation date is______________.5. As a team you will interview a client and create a design that is acceptable to your client.6. Complete all work required and answer all questions in this brief booklet.7. Write your name, etc. on the Assessment Rubric and Peer Presentations Review forms on back of packet.8. Review the Assessment Rubric to know all grade requirements and be sure they are all satisfied.

Specifications1. Research Green Building techniques and materials to offer your client.

2. Incorporate Green Building techniques and materials into your design

3. Your team will complete a design for either new construction or a building remodel. This will be determined by your

teacher. Your teacher will assign you a client.

4. You will interveiw your client to gain an understanding of what their needs are.

5. You will use your research to incorporate Green Building materials and techniques into your designs

6. You will complete three levels of drawings: Bubble Diagrams, Rough Sketches, & Final Drawings (Iso, Elevations, Plan)

Restrictions

1. You must conform to a reasonable budget. This budget must be agreed to by your client. Use Excel's mortgage

worksheet to estimate payments.

PART ONE : Research (idea development)

List the steps you take to get the information, etc. that will lead you to your final design solution (roughoutline)? Include what you expect to find out with each step and where you will find it. Indicate what you will

do and what your partner will do to solve the problem (team strategy).

1

2

3

4

5

2

PART ONE cont'd: Research QuestionsProvide insightful answers to the research questions below concerning the information you will need to gatherleading to the solution of this design problem.

1. Define Green Building. Then list five Green Building techniques and 5 Green Building materials.

2. Define Energy Efficiency. Then list three energy efficiency techniques that you will include in your design.

3. Define Trombe Wall. Then list three techniques to using passive solar in your design.

4. Define LEED certification. Then list five advantages to having a building that is LEED certified

5. Define Renewable Energy. Then list three forms of renewable energy that could be used on this project

6. List three questions that you will add to your client survey.

3

PART TWO : Design PossibilitiesBubble Diagrams are an importaint part of the design process and allow the designer to layout rooms

without committing to room shape and size. This is where you place your bubble diagrams. You should draw or attach your two top ideas to this page.

Design #1

Design #2

4

PART TWO cont.: Rough Sketch

This sketch should be the result of taking the componants from your bubble diagrams your client desires and laying out a final rough draft design. You will want to make your bubbles light and darken in roughly where walls will be. Annotate where design features, windows and doors, and special materials will be located and

5

PART TWO cont.: Final Sketches

Attach all elevations, isometrics and plan views behind this page. Staple all related pages into the design brief at this point. These may be hand drawings or CAD drawings. Make sure that you use color in your isometric

6

PART THREE : RESOURCE USAGEThese are the SEVEN RESOURCES of TECHNOLOGY . How have you used these resources to completeyour project?

PEOPLE

Name Briefly describe how each helped you

TOOLS & MACHINES

Tools used Briefly explain how each extended your abilities

INFORMATION

Where did you find and/or how did you acquire information needed to reach your goals?

Place/Event Briefly describe the information you acquired

ENERGY

The energy form Application - What did the energy source drive?Mechanical

(potential, kinetic)Thermal

Radiant (Solar)ElectricalChemicalNuclear

MATERIALS and CAPITAL($)

List any materials that you used to complete this activity, then calculate the total cost

Materials Used Quantity Unit Price Total $ Amount

Total $ Spent:THE TIME RESOURCE

Describe when and how you used your time to complete this activity

DateTIME

SPENT NATURE OF ACTIVITY

7

PART FOUR : Activity Assessment1. Describe a problem or issue that you had to solve during the design process.

2. What is the best feature of your final design solution (most imaginative)?

3. State one scientific principle that you applied to your Green Design.

4. List three Green materials that you incorporated into your design.

5. List three Green design and/or building techniques you incorporated in your design.

6. Describe your feelings about your final design. Do you feel you met the clients needs? Was your voice heardin the design process and your ideas considered?

7. If you had a 2nd chance to do this project what three things would you do differently? Include atleast one design feature.

8

Team AssessmentRate your team members based on their participation and performance. This is your opportunity to give feedback on the performance and participation of each individual member of your team. This is not a time to express personal feelings or dislikes. Circle the number that best represents their effort. Rate yourself first.

Using this assessment inappropriately will cost YOU points!

1. Team Member:________________________________________________________________

Rating: Lowest HighestPerformance 1 2 3 4 5

Participation 1 2 3 4 5

2. Team Member:________________________________________________________________

Rating: Lowest HighestPerformance 1 2 3 4 5

Participation 1 2 3 4 5

3. Team Member:________________________________________________________________

Rating: Lowest HighestPerformance 1 2 3 4 5

Participation 1 2 3 4 5

4. Team Member:________________________________________________________________

Rating: Lowest HighestPerformance 1 2 3 4 5

Participation 1 2 3 4 5

5. Team Member:________________________________________________________________

Rating: Lowest HighestPerformance 1 2 3 4 5

Participation 1 2 3 4 5

9

Building Green Assessment Rubric

Student:________________________________________________________ Period:___________________

Assessment Scale:6 = Exceptional - Your work shows brilliance and extreme high quality.5 = Accomplished - Your work fulfills all of the objectives of this portion of the activity.4 = Acceptable - Your work is minimally acceptable or needs minor revisions.3 - 2 = Minimum - Your work is either incomplete or requires major revisions.1 = Not Addressed - Your work did not address or include what was asked for in the rubric.0 = Not Turned In - Some portion of the activity was not turned in leaving nothing to score.

Points are awarded to each of the sub-categories (left margin), then their total average is placed at the bottom the page and can be applied to the assessment scale at the top and the grade legend at the bottom.

Client Survey (2)Survey was done in a professional mannerSurvey was completed in a detailed manner

Design (3)Bubble Diagrams were done neatly and a variety of design options were presentedRough sketches were completed based on client input to the clients expectationsFinal drawings were completed based on client input

Green Building (4)Green Building techniques were incorporated into the designGreen Building materials were incorporated into the designEnergy Efficiency methods and standards were employed in the design LEED checklist was used correctly and assigned rating was achieved

Design Brief (4) Part One: A strategy and answers to research questions were insightful, clear, detailed and completePart Two: Quality of sketches were clear, detailed and completePart Three: Resource pages were clear, detailed and accurate - particularly the time resource logPart Four: Activity & Student Assessment: Neat, complete and insightful

Presentation (3)Student presentation was complete and included all aspects of the design processStudent participated in the presentationStudent was in professional dress for the presentation

Team Work (3) Safety precautions were documented and followedActed as a responsible member of the team during work and testingActed efficiently during work and testing sessions (time)Submitted Late: -1Activity Total Average (19 criteria)

Grade Legend

A+ = Above 5.00 B+ = 4.25 to 4.49 C+ = 3.75 to 3.99 D+ = 3.25 to 3.49 F = 0 to 2.99 A = 4.50 to 5.00 B = 4.00 to 4.24 C = 3.50 to 3.74 D = 3.0 to 3.24

Instuctor Comments: On reverse side