APPENDIX A PROCESS WATER MONITORING REPORTS ...

152
APPENDIX A PROCESS WATER MONITORING REPORTS (monthly discharge monitoring reports can be accessed through the Department of Ecology website: https://fortress.wa.gov/ecy/wqreports/public/f?p=110:810:752307260208474::::: )

Transcript of APPENDIX A PROCESS WATER MONITORING REPORTS ...

APPENDIX A

PROCESS WATER MONITORING REPORTS

(monthly discharge monitoring reports can be accessed through the Department of Ecology website:

https://fortress.wa.gov/ecy/wqreports/public/f?p=110:810:752307260208474::::: )

JA

NU

AR

Y20

16

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

0.9

50

.42

0.5

26

41

,31

12

37

98

37

43

99

54

01

14

95

52

,54

42

,14

12

0.9

50

.40

0.5

5S

AM

PL

E D

AT

E7

-Jan

64

1,3

13

23

79

93

74

39

96

40

21

49

55

2,5

46

2,1

43

30

.95

0.4

20

.54

BO

D5

, mg

/L

1

66

64

1,3

18

23

80

23

74

41

,00

04

03

15

05

52

,55

62

,15

14

1.0

30

.57

0.4

7T

KN

, mg

/L8

.17

01

,42

92

58

69

40

47

1,0

85

43

71

63

59

2,7

72

2,3

33

51

.05

0.4

90

.56

NH

3-N

, mg

/L2

.97

11

,46

12

68

89

41

48

1,1

09

44

71

66

61

2,8

33

2,3

84

61

.07

0.1

70

.89

FD

S, m

g/L

32

27

21

,47

82

68

99

42

49

1,1

22

45

21

68

61

2,8

67

2,4

13

71

.42

0.3

11

.11

6.6

So

l.BO

D5

, mg

/L--

-9

61

,96

23

41

,19

45

66

51

,48

96

00

22

38

23

,80

63

,20

38

1.0

30

.66

0.3

77

01

,43

02

58

70

40

47

1,0

86

43

81

63

59

2,7

74

2,3

35

91

.23

0.7

60

.47

83

1,7

02

30

1,0

36

48

56

1,2

92

52

11

94

71

3,3

02

2,7

79

10

1.2

20

.27

0.9

58

21

,68

32

91

,02

44

85

61

,27

75

15

19

27

03

,26

42

,74

71

11

.31

0.4

80

.83

BI-

AN

NU

AL

TE

ST

ING

88

1,8

10

32

1,1

01

51

60

1,3

74

55

42

06

75

3,5

11

2,9

55

12

1.3

70

.38

0.9

9M

arch

& S

ep

t.9

31

,90

33

31

,15

85

46

31

,44

45

82

21

77

93

,69

13

,10

71

31

.41

0.2

01

.21

PA

RA

ME

TE

RV

AL

UE

95

1,9

55

34

1,1

89

55

65

1,4

84

59

82

23

81

3,7

92

3,1

91

14

1.4

10

.17

1.2

59

61

,95

73

41

,19

15

56

51

,48

65

99

22

38

13

,79

73

,19

61

51

.41

0.3

61

.05

SA

MP

LE

DA

TE

9-S

ep

95

1,9

51

34

1,1

87

55

65

1,4

81

59

72

22

81

3,7

84

3,1

84

16

1.4

00

.33

1.0

76

.4N

a, m

g/L

10

19

51

,93

83

41

,17

95

56

41

,47

15

93

22

18

13

,76

03

,16

41

71

.34

0.2

71

.07

Ca,

mg

/L4

.79

11

,85

63

21

,12

95

36

21

,40

95

68

21

17

73

,60

13

,03

11

81

.29

0.2

31

.06

Mg

, mg

/L5

.58

71

,78

13

11

,08

35

05

91

,35

25

45

20

37

43

,45

42

,90

71

91

.38

0.3

31

.05

K, m

g/L

12

69

31

,91

23

31

,16

45

46

31

,45

25

85

21

87

93

,71

03

,12

22

01

.48

0.3

81

.10

Cl,

mg

/L5

0.8

10

02

,04

43

61

,24

45

86

81

,55

16

25

23

38

53

,96

53

,33

72

11

.48

0.4

11

.07

Sul

fate

-S, m

g/L

18

.91

00

2,0

48

36

1,2

46

58

68

1,5

54

62

72

33

85

3,9

72

3,3

43

22

1.4

40

.44

1.0

0T

ota

l-P, m

g/L

6.9

97

1,9

95

35

1,2

14

56

66

1,5

14

61

02

27

83

3,8

69

3,2

56

23

1.4

40

.44

1.0

06

.9A

lkal

inity

, mg

/L2

71

97

1,9

89

35

1,2

10

56

66

1,5

10

60

92

26

83

3,8

59

3,2

47

24

1.4

40

.41

1.0

29

71

,98

83

51

,21

05

66

61

,50

96

08

22

68

33

,85

63

,24

52

51

.44

0.2

71

.17

97

1,9

89

35

1,2

10

56

66

1,5

10

60

92

26

83

3,8

58

3,2

47

26

1.4

40

.26

1.1

89

71

,99

33

51

,21

35

66

61

,51

36

10

22

78

33

,86

63

,25

42

71

.44

0.3

11

.13

97

1,9

89

35

1,2

10

56

66

1,5

10

60

92

26

83

3,8

58

3,2

47

28

1.4

40

.24

1.2

09

71

,99

33

51

,21

35

66

61

,51

36

10

22

78

33

,86

63

,25

42

91

.42

0.1

61

.26

96

1,9

63

34

1,1

94

56

65

1,4

90

60

12

23

82

3,8

07

3,2

04

30

1.4

10

.13

1.2

96

.99

51

,95

53

41

,18

95

56

51

,48

45

98

22

38

13

,79

13

,19

13

11

.40

0.2

11

.19

95

1,9

38

34

1,1

79

55

64

1,4

71

59

32

21

81

3,7

60

3,1

64

TO

TA

L4

0.4

71

0.9

02

9.5

7M

ON

TH

LY

TO

TA

L

2,7

34

56

,03

39

79

34

,09

21

,58

61

,85

74

2,5

31

17

,14

76

,38

02

,32

91

08

,69

09

1,4

75

MIN

.0

.95

0.1

30

.37

6.4

MA

X.

1.4

80

.76

1.2

96

.9

AV

G.

1.3

10

.35

0.9

56

.7Y

EA

R T

O D

AT

E

2,7

34

56

,03

39

79

34

,09

21

,58

61

,85

74

2,5

31

17

,14

76

,38

02

,32

91

08

,69

09

1,4

75

YT

D4

0.4

71

0.9

02

9.6

YT

D T

OT

AL

DA

YS

:3

1

Y

TD

AN

NU

AL

AV

ER

AG

E D

AIL

Y F

LO

W, M

G/D

AY

:0

.95

Fig

ure

3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

FE

BR

UA

RY

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.4

10

.18

1.2

34

87

7,7

16

12

61

,18

65

56

51

,48

05

97

22

28

16

,81

13

,18

32

1.4

20

.15

1.2

6S

AM

PL

E D

AT

E3

-Fe

b4

91

7,7

74

12

71

,19

55

66

51

,49

16

01

22

48

26

,86

33

,20

63

1.4

10

.02

1.3

86

.5B

OD

5, m

g/L

65

74

87

7,7

16

12

61

,18

65

56

51

,48

05

97

22

28

16

,81

13

,18

34

1.3

00

.19

1.1

2T

KN

, mg

/L4

1.5

45

17

,13

41

16

1,0

97

51

60

1,3

68

55

22

05

75

6,2

98

2,9

43

51

.44

0.1

51

.29

NH

3-N

, mg

/L1

0.7

49

87

,87

91

28

1,2

11

56

66

1,5

11

60

92

27

83

6,9

56

3,2

50

61

.46

0.1

41

.33

FD

S, m

g/L

58

05

06

8,0

17

13

11

,23

25

76

71

,53

86

20

23

18

47

,07

83

,30

77

1.4

40

.14

1.2

9S

ol.B

OD

5, m

g/L

---

49

87

,87

91

28

1,2

11

56

66

1,5

11

60

92

27

83

6,9

56

3,2

50

81

.46

0.1

71

.29

E.C

., uS

10

21

50

68

,01

71

31

1,2

32

57

67

1,5

38

62

02

31

84

7,0

78

3,3

07

91

.48

0.1

61

.31

(Mar

, M

ay,

Aug

, O

ct)

51

18

,08

51

32

1,2

43

58

68

1,5

51

62

52

33

85

7,1

38

3,3

35

10

1.4

60

.14

1.3

27

.35

04

7,9

79

13

01

,22

75

76

71

,53

06

17

23

08

47

,04

43

,29

11

11

.44

0.1

21

.32

BI-

AN

NU

AL

TE

ST

ING

50

07

,91

01

29

1,2

16

57

66

1,5

17

61

22

28

83

6,9

83

3,2

63

12

1.4

80

.10

1.3

7M

arch

& S

ep

t.5

11

8,0

85

13

21

,24

35

86

81

,55

16

25

23

38

57

,13

83

,33

51

31

.43

0.1

41

.29

PA

RA

ME

TE

RV

AL

UE

49

47

,82

21

27

1,2

02

56

65

1,5

00

60

52

25

82

6,9

05

3,2

27

14

1.4

30

.26

1.1

74

96

7,8

48

12

81

,20

75

66

61

,50

56

07

22

68

26

,92

93

,23

71

51

.43

0.3

01

.13

SA

MP

LE

DA

TE

9-S

ep

49

67

,85

01

28

1,2

07

56

66

1,5

05

60

72

26

82

6,9

30

3,2

38

16

1.4

20

.26

1.1

6N

a, m

g/L

10

14

92

7,7

82

12

71

,19

65

66

51

,49

36

02

22

48

26

,87

03

,21

01

71

.43

0.2

91

.15

7.2

Ca,

mg

/L4

.74

96

7,8

48

12

81

,20

65

66

61

,50

56

07

22

68

26

,92

83

,23

71

81

.44

0.3

81

.06

Mg

, mg

/L5

.54

98

7,8

90

12

81

,21

35

66

61

,51

36

10

22

78

36

,96

53

,25

41

91

.43

0.4

01

.03

K, m

g/L

12

64

95

7,8

35

12

81

,20

45

66

61

,50

36

06

22

58

26

,91

73

,23

22

01

.41

0.3

61

.06

Cl,

mg

/L5

0.8

49

07

,75

31

26

1,1

92

55

65

1,4

87

59

92

23

81

6,8

44

3,1

98

21

1.4

00

.45

0.9

6S

ulfa

te-S

, mg

/L1

8.9

48

57

,67

41

25

1,1

80

55

64

1,4

72

59

32

21

81

6,7

75

3,1

65

22

1.3

60

.47

0.8

9T

ota

l-P, m

g/L

6.9

47

17

,45

81

21

1,1

47

53

62

1,4

30

57

72

15

78

6,5

84

3,0

76

23

1.3

70

.46

0.9

1A

lkal

inity

, mg

/L2

71

47

47

,50

21

22

1,1

53

54

63

1,4

39

58

02

16

79

6,6

23

3,0

94

24

1.4

00

.40

1.0

06

.34

85

7,6

74

12

51

,18

05

56

41

,47

25

93

22

18

16

,77

53

,16

52

51

.42

0.3

71

.05

49

07

,75

81

26

1,1

93

55

65

1,4

88

60

02

23

81

6,8

49

3,2

00

26

1.4

00

.33

1.0

84

86

7,6

95

12

51

,18

35

56

41

,47

65

95

22

18

16

,79

33

,17

42

71

.41

0.3

51

.06

48

77

,70

41

25

1,1

84

55

64

1,4

77

59

62

22

81

6,8

01

3,1

78

28

1.4

20

.32

1.0

94

90

7,7

64

12

61

,19

45

66

51

,48

96

00

22

38

26

,85

43

,20

32

91

.41

0.2

21

.19

48

97

,74

61

26

1,1

91

55

65

1,4

85

59

92

23

81

6,8

38

3,1

95

TO

TA

L4

1.2

17

.43

33

.78

MO

NT

HL

Y T

OT

AL

1

4,2

62

22

5,7

93

3,6

77

34

,71

11

,61

51

,89

04

3,3

03

17

,45

96

,49

52

,37

11

99

,33

09

3,1

35

MIN

.1

.30

0.0

20

.89

6.3

MA

X.

1.4

80

.47

1.3

87

.3

AV

G.

1.4

20

.26

1.1

66

.8Y

EA

R T

O D

AT

E

16

,99

72

81

,82

64

,65

66

8,8

03

3,2

02

3,7

47

85

,83

43

4,6

06

12

,87

54

,70

03

08

,02

01

84

,61

1

YT

D8

1.6

81

8.3

36

3.3

YT

D T

OT

AL

DA

YS

:6

0

Y

TD

AN

NU

AL

AV

ER

AG

E D

AIL

Y F

LO

W, M

G/D

AY

:1

.06

Fig

ure

3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

MA

RC

H20

16

L

AB

OR

AT

OR

Y A

NA

LY

SE

STO

TA

LM

AK

E-U

PP

RO

C.

WE

EK

LY

MO

NT

HL

Y T

ES

TS

DA

TE

FLO

WW

AT

ER

WA

TER

pH

MG

/DM

G/D

MG

/DS

.U.

PA

RA

ME

TE

RV

AL

UE

TK

NB

OD

NH

3N

aC

aM

gK

Cl

SO

4-S

To

tal P

FD

SA

lk.

R

EM

AR

KS

11

.41

0.1

21

.28

51

56

,68

91

38

1,2

09

93

84

1,5

02

46

72

02

12

26

,16

13

,20

42

1.4

00

.20

1.2

0S

AM

PL

E D

AT

E3

-Mar

51

46

,67

81

38

1,2

07

93

84

1,5

00

46

62

01

12

26

,15

03

,19

83

1.4

30

.29

1.1

47

.4B

OD

5, m

g/L

57

05

23

6,7

84

14

01

,22

69

48

61

,52

44

74

20

51

24

6,2

49

3,2

49

41

.43

0.3

01

.13

TK

N, m

g/L

43

.95

24

6,8

08

14

11

,23

09

48

61

,52

94

75

20

51

24

6,2

70

3,2

61

51

.42

0.2

51

.17

NH

3-N

, mg

/L1

1.8

51

86

,73

11

39

1,2

16

93

85

1,5

12

47

02

03

12

36

,20

03

,22

46

1.4

10

.28

1.1

3F

DS

, mg

/L5

25

51

66

,70

41

39

1,2

11

93

85

1,5

05

46

82

02

12

26

,17

43

,21

17

1.4

20

.32

1.1

0S

ol.B

OD

5, m

g/L

---

52

26

,77

31

40

1,2

24

94

86

1,5

21

47

32

04

12

46

,23

83

,24

48

1.4

10

.39

1.0

2E

C, u

S9

58

51

86

,72

51

39

1,2

15

93

85

1,5

10

47

02

03

12

36

,19

43

,22

19

1.4

20

.37

1.0

45

19

6,7

33

13

91

,21

79

38

51

,51

24

70

20

31

23

6,2

02

3,2

25

10

1.4

20

.34

1.0

87

.05

20

6,7

52

14

01

,22

09

48

51

,51

64

71

20

41

23

6,2

19

3,2

34

11

1.4

20

.31

1.1

1B

I-A

NN

UA

L T

ES

TIN

G5

21

6,7

67

14

01

,22

39

48

51

,52

04

73

20

41

23

6,2

33

3,2

41

12

1.4

80

.30

1.1

8M

arch

& S

ep

t.5

40

7,0

15

14

51

,26

89

78

91

,57

54

90

21

21

28

6,4

61

3,3

60

13

1.4

20

.28

1.1

4P

AR

AM

ET

ER

VA

LU

E5

21

6,7

70

14

01

,22

39

48

61

,52

04

73

20

41

24

6,2

35

3,2

42

14

1.3

80

.25

1.1

25

03

6,5

37

13

51

,18

19

18

31

,46

84

56

19

71

19

6,0

21

3,1

31

15

1.4

30

.16

1.2

7S

AM

PL

E D

AT

E3

-Mar

52

46

,80

11

41

1,2

29

94

86

1,5

27

47

52

05

12

46

,26

43

,25

71

61

.43

0.2

41

.19

Na,

mg

/L1

03

52

36

,78

51

40

1,2

26

94

86

1,5

24

47

42

05

12

46

,24

93

,25

01

71

.42

0.2

01

.21

6.7

Ca,

mg

/L7

.95

19

6,7

35

13

91

,21

79

38

51

,51

24

70

20

31

23

6,2

03

3,2

26

18

1.4

10

.27

1.1

4M

g, m

g/L

7.2

51

56

,68

91

38

1,2

09

93

84

1,5

02

46

72

02

12

26

,16

13

,20

41

91

.43

0.2

81

.15

K, m

g/L

12

85

23

6,7

93

14

11

,22

89

48

61

,52

54

74

20

51

24

6,2

57

3,2

54

20

1.4

40

.29

1.1

5C

l, m

g/L

39

.85

25

6,8

22

14

11

,23

39

58

61

,53

24

76

20

61

24

6,2

84

3,2

67

21

1.4

50

.30

1.1

5S

ulfa

te-S

, mg

/L1

7.2

53

26

,90

51

43

1,2

48

96

87

1,5

51

48

22

08

12

66

,35

93

,30

72

21

.47

0.2

81

.19

To

tal-P

, mg

/L1

0.4

53

76

,96

91

44

1,2

59

97

88

1,5

65

48

72

10

12

76

,41

93

,33

82

31

.48

0.3

11

.17

Alk

alin

ity, m

g/L

27

35

42

7,0

36

14

61

,27

19

88

91

,58

04

91

21

21

28

6,4

80

3,3

70

24

1.4

90

.39

1.1

06

.35

44

7,0

68

14

61

,27

79

88

91

,58

74

93

21

31

29

6,5

10

3,3

85

25

1.5

00

.37

1.1

35

49

7,1

33

14

81

,28

99

99

01

,60

24

98

21

51

30

6,5

70

3,4

16

26

1.5

10

.42

1.0

95

53

7,1

81

14

91

,29

81

00

91

1,6

13

50

12

17

13

16

,61

43

,43

92

71

.53

0.4

31

.09

55

97

,25

61

50

1,3

11

10

19

21

,63

05

07

21

91

32

6,6

84

3,4

75

28

1.4

90

.44

1.0

55

45

7,0

75

14

61

,27

99

88

91

,58

94

94

21

41

29

6,5

17

3,3

89

29

1.4

50

.32

1.1

35

31

6,8

96

14

31

,24

69

68

71

,54

94

82

20

81

26

6,3

52

3,3

03

30

1.4

30

.29

1.1

45

23

6,7

90

14

11

,22

79

48

61

,52

54

74

20

51

24

6,2

54

3,2

52

31

1.4

70

.29

1.1

87

.15

38

6,9

80

14

41

,26

19

78

81

,56

74

87

21

11

27

6,4

29

3,3

43

TO

TA

L4

4.6

89

.28

35

.39

MO

NT

HL

Y T

OT

AL

1

6,3

57

21

2,3

79

4,3

97

38

,37

72

,94

32

,68

34

7,6

92

14

,82

96

,40

93

,87

51

95

,61

21

01

,71

8

MIN

.1

.38

0.1

21

.02

6.3

MA

X.

1.5

30

.44

1.2

87

.4

AV

G.

1.4

40

.30

1.1

46

.9Y

EA

R T

O D

AT

E

33

,35

34

94

,20

49

,05

31

07

,18

06

,14

56

,42

91

33

,52

64

9,4

35

19

,28

48

,57

55

03

,63

22

86

,32

9

YT

D1

26

.36

27

.62

98

.7

Y

TD

TO

TA

L D

AY

S:

91

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.0

9F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GTO

N

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

AP

RIL

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.5

00

.31

1.1

94

32

6,5

66

69

1,2

91

99

90

1,6

04

49

92

16

13

06

,00

23

,42

12

1.4

80

.01

1.4

6S

AM

PL

E D

AT

E6

-Ap

r4

25

6,4

52

68

1,2

68

97

89

1,5

76

49

02

12

12

85

,89

83

,36

13

1.4

70

.14

1.3

3B

OD

5, m

g/L

52

44

24

6,4

45

68

1,2

67

97

89

1,5

74

49

02

12

12

85

,89

23

,35

84

1.4

70

.16

1.3

1T

KN

, mg

/L3

4.5

42

26

,40

66

71

,25

99

78

81

,56

54

87

21

01

27

5,8

55

3,3

37

51

.47

0.1

31

.34

NH

3-N

, mg

/L5

.54

23

6,4

26

67

1,2

63

97

88

1,5

70

48

82

11

12

85

,87

43

,34

86

1.4

90

.15

1.3

36

.6F

DS

, mg

/L4

79

42

76

,49

26

81

,27

69

88

91

,58

64

93

21

31

29

5,9

34

3,3

82

71

.47

0.2

81

.19

So

l.BO

D5

, mg

/L--

-4

23

6,4

28

67

1,2

64

97

88

1,5

70

48

82

11

12

85

,87

63

,34

98

1.4

00

.13

1.2

74

03

6,1

15

64

1,2

02

92

84

1,4

94

46

42

01

12

15

,58

93

,18

69

1.4

20

.06

1.3

74

10

6,2

25

65

1,2

24

94

86

1,5

21

47

32

04

12

45

,69

03

,24

31

01

.37

0.1

41

.23

39

66

,00

76

31

,18

19

18

31

,46

74

56

19

71

19

5,4

91

3,1

30

11

1.4

80

.30

1.1

8B

I-A

NN

UA

L T

ES

TIN

G4

26

6,4

71

68

1,2

72

98

89

1,5

81

49

22

12

12

85

,91

63

,37

21

21

.47

0.3

21

.15

Mar

ch &

Se

pt.

42

26

,40

56

71

,25

99

78

81

,56

44

86

21

01

27

5,8

55

3,3

37

13

1.4

70

.26

1.2

16

.7P

AR

AM

ET

ER

VA

LU

E4

23

6,4

17

67

1,2

61

97

88

1,5

68

48

72

11

12

75

,86

63

,34

31

41

.51

0.3

11

.19

43

46

,59

66

91

,29

79

99

11

,61

15

01

21

71

31

6,0

30

3,4

37

15

1.4

90

.31

1.1

8S

AM

PL

E D

AT

E3

-Mar

42

96

,51

36

81

,28

09

88

91

,59

14

95

21

41

29

5,9

54

3,3

93

16

1.4

80

.20

1.2

8N

a, m

g/L

10

34

25

6,4

58

68

1,2

69

97

89

1,5

77

49

02

12

12

85

,90

33

,36

41

71

.46

0.2

11

.24

Ca,

mg

/L7

.94

19

6,3

66

67

1,2

51

96

87

1,5

55

48

42

09

12

65

,82

03

,31

71

81

.39

0.0

41

.35

Mg

, mg

/L7

.24

00

6,0

77

64

1,1

94

92

83

1,4

84

46

21

99

12

15

,55

53

,16

61

91

.41

0.2

51

.16

K, m

g/L

12

84

07

6,1

79

65

1,2

15

93

85

1,5

09

46

92

03

12

35

,64

93

,21

92

01

.46

0.1

31

.33

6.5

Cl,

mg

/L3

9.8

41

96

,36

66

71

,25

19

68

71

,55

54

84

20

91

26

5,8

20

3,3

17

21

1.4

70

.09

1.3

9S

ulfa

te-S

, mg

/L1

7.2

42

46

,43

46

81

,26

59

78

81

,57

24

89

21

11

28

5,8

82

3,3

52

22

1.4

30

.07

1.3

6T

ota

l-P, m

g/L

10

.44

10

6,2

32

65

1,2

25

94

86

1,5

22

47

32

05

12

45

,69

73

,24

72

31

.39

0.0

51

.34

Alk

alin

ity, m

g/L

27

34

00

6,0

80

64

1,1

95

92

84

1,4

85

46

22

00

12

15

,55

83

,16

72

41

.37

0.1

01

.27

39

45

,98

86

31

,17

79

08

21

,46

34

55

19

71

19

5,4

74

3,1

20

25

1.4

10

.06

1.3

54

06

6,1

66

65

1,2

12

93

85

1,5

06

46

82

02

12

25

,63

63

,21

22

61

.43

0.0

71

.36

41

16

,24

56

61

,22

79

48

61

,52

54

74

20

51

24

5,7

08

3,2

53

27

1.4

20

.04

1.3

87

.04

10

6,2

24

65

1,2

23

94

86

1,5

20

47

32

04

12

45

,69

03

,24

32

81

.40

0.1

61

.24

40

46

,13

86

41

,20

79

38

41

,49

94

66

20

11

22

5,6

11

3,1

98

29

1.3

80

.04

1.3

33

96

6,0

12

63

1,1

82

91

83

1,4

69

45

71

97

11

95

,49

63

,13

23

01

.40

0.1

41

.25

40

26

,10

16

41

,19

99

28

41

,49

04

63

20

01

21

5,5

77

3,1

78

TO

TA

L4

3.2

54

.65

38

.60

MO

NT

HL

Y T

OT

AL

1

2,4

46

18

9,0

29

1,9

84

37

,15

62

,85

02

,59

74

6,1

75

14

,35

86

,20

53

,75

21

72

,79

59

8,4

83

MIN

.1

.37

0.0

11

.15

6.5

MA

X.

1.5

10

.32

1.4

67

.0

AV

G.

1.4

40

.16

1.2

96

.7Y

EA

R T

O D

AT

E

45

,79

96

83

,23

31

1,0

37

14

4,3

37

8,9

95

9,0

27

17

9,7

01

63

,79

32

5,4

88

12

,32

76

76

,42

83

84

,81

1

YT

D1

69

.61

32

.27

13

7.3

YT

D T

OT

AL

DA

YS

:1

21

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.1

4F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GTO

N

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST-

52

13

MA

Y20

16

L

AB

OR

AT

OR

Y A

NA

LY

SE

STO

TA

LM

AK

E-U

PP

RO

C.

WE

EK

LY

MO

NT

HL

Y T

ES

TS

DA

TE

FL

OW

WA

TE

RW

AT

ER

pH

MG

/DM

G/D

MG

/DS

.U.

PA

RA

ME

TE

RV

AL

UE

TK

NB

OD

NH

3N

aC

aM

gK

Cl

SO

4-S

To

tal P

FD

SA

lk.

R

EM

AR

KS

11

.37

0.0

91

.28

81

81

3,0

71

25

91

,18

19

18

31

,46

84

56

19

71

19

10

,62

93

,13

02

1.4

00

.09

1.3

0S

AM

PL

E D

AT

E4

-May

83

01

3,2

72

26

31

,19

99

28

41

,49

04

63

20

01

21

10

,79

23

,17

83

1.3

70

.10

1.2

7B

OD

5, m

g/L

11

40

81

71

3,0

56

25

91

,18

09

08

21

,46

64

56

19

71

19

10

,61

63

,12

74

1.3

70

.12

1.2

56

.6T

KN

, mg

/L7

1.3

81

81

3,0

71

25

91

,18

19

18

31

,46

84

56

19

71

19

10

,62

93

,13

05

1.3

70

.11

1.2

5N

H3

-N, m

g/L

22

.68

14

13

,01

72

58

1,1

76

90

82

1,4

62

45

41

96

11

91

0,5

85

3,1

17

61

.37

0.0

91

.28

FD

S, m

g/L

92

78

14

13

,00

92

58

1,1

75

90

82

1,4

61

45

41

96

11

91

0,5

78

3,1

15

71

.38

0.0

81

.30

So

l.BO

D5

, mg

/L--

-8

18

13

,07

42

59

1,1

81

91

83

1,4

68

45

61

97

11

91

0,6

31

3,1

31

81

.37

0.0

81

.29

E.C

, uS

16

99

81

41

3,0

17

25

81

,17

69

08

21

,46

24

54

19

61

19

10

,58

53

,11

79

1.3

80

.17

1.2

08

18

13

,07

42

59

1,1

81

91

83

1,4

68

45

61

97

11

91

0,6

31

3,1

31

10

1.4

10

.28

1.1

48

41

13

,44

62

67

1,2

15

93

85

1,5

10

46

92

03

12

31

0,9

33

3,2

20

11

1.3

50

.10

1.2

46

.9B

I-A

NN

UA

L T

ES

TIN

G8

01

12

,81

32

54

1,1

58

89

81

1,4

39

44

71

93

11

71

0,4

19

3,0

68

12

1.4

20

.11

1.3

2M

arch

& S

ep

t.8

47

13

,54

32

68

1,2

24

94

86

1,5

21

47

32

04

12

41

1,0

13

3,2

43

13

1.4

20

.15

1.2

8P

AR

AM

ET

ER

VA

LU

E8

47

13

,54

42

69

1,2

24

94

86

1,5

21

47

32

04

12

41

1,0

13

3,2

43

14

1.4

10

.19

1.2

28

39

13

,42

22

66

1,2

13

93

85

1,5

07

46

92

03

12

21

0,9

14

3,2

14

15

1.4

10

.05

1.3

6S

AM

PL

E D

AT

E3

-Mar

83

71

3,3

78

26

51

,20

99

38

41

,50

24

67

20

21

22

10

,87

93

,20

41

61

.41

0.0

31

.37

Na,

mg

/L1

03

83

71

3,3

77

26

51

,20

99

38

41

,50

24

67

20

21

22

10

,87

83

,20

41

71

.40

0.0

41

.37

Ca,

mg

/L7

.98

35

13

,34

62

65

1,2

06

92

84

1,4

99

46

62

01

12

21

0,8

53

3,1

96

18

1.2

00

.04

1.1

67

.1M

g, m

g/L

7.2

71

51

1,4

32

22

71

,03

37

97

21

,28

43

99

17

21

04

9,2

96

2,7

38

19

1.2

40

.09

1.1

5K

, mg

/L1

28

73

91

1,8

20

23

41

,06

88

27

51

,32

74

13

17

81

08

9,6

12

2,8

31

20

1.3

30

.11

1.2

2C

l, m

g/L

39

.87

90

12

,62

72

50

1,1

41

88

80

1,4

18

44

11

91

11

51

0,2

68

3,0

24

21

1.4

10

.12

1.3

0S

ulfa

te-S

, mg

/L1

7.2

84

01

3,4

28

26

61

,21

39

38

51

,50

84

69

20

31

23

10

,91

93

,21

62

21

.43

0.0

81

.34

To

tal-P

, mg

/L1

0.4

84

81

3,5

53

26

91

,22

59

48

61

,52

24

73

20

41

24

11

,02

13

,24

62

31

.14

0.0

71

.07

Alk

alin

ity, m

g/L

27

36

76

10

,81

62

14

97

77

56

81

,21

43

78

16

39

98

,79

52

,59

02

41

.43

0.0

81

.34

84

81

3,5

53

26

91

,22

59

48

61

,52

24

73

20

41

24

11

,02

13

,24

62

51

.38

0.0

61

.32

6.5

82

31

3,1

56

26

11

,18

99

18

31

,47

74

59

19

81

20

10

,69

83

,15

12

61

.41

0.0

91

.32

83

81

3,4

04

26

61

,21

19

38

51

,50

54

68

20

21

22

10

,89

93

,21

02

71

.39

0.0

81

.30

82

41

3,1

80

26

11

,19

19

18

31

,48

04

60

19

91

20

10

,71

73

,15

62

81

.45

0.1

41

.31

86

11

3,7

60

27

31

,24

39

58

71

,54

54

80

20

81

26

11

,18

93

,29

52

91

.39

0.0

81

.32

82

91

3,2

49

26

31

,19

79

28

41

,48

84

63

20

01

21

10

,77

43

,17

33

01

.44

0.2

01

.23

85

31

3,6

46

27

11

,23

39

58

61

,53

24

76

20

61

24

11

,09

73

,26

83

11

.48

0.1

71

.31

88

01

4,0

64

27

91

,27

19

78

91

,57

94

91

21

21

28

11

,43

63

,36

8

TO

TA

L4

2.7

33

.29

39

.43

MO

NT

HL

Y T

OT

AL

2

5,4

07

40

6,2

21

8,0

53

36

,70

22

,81

52

,56

64

5,6

11

14

,18

26

,12

93

,70

63

30

,32

29

7,2

79

MIN

.1

.14

0.0

31

.07

6.5

MA

X.

1.4

80

.28

1.3

77

.1

AV

G.

1.3

80

.11

1.2

76

.8Y

EA

R T

O D

AT

E

71

,20

61

,08

9,4

54

19

,09

01

81

,03

91

1,8

10

11

,59

22

25

,31

27

7,9

75

31

,61

71

6,0

33

1,0

06

,75

04

82

,09

1

YT

D2

12

.34

35

.56

17

6.8

YT

D T

OT

AL

DA

YS

:1

52

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.1

6F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GTO

N

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST-

521

3

JU

NE

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

STO

TAL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

ATE

RW

ATE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.4

80

.18

1.3

06

.56

28

8,1

42

18

61

,27

19

78

91

,57

94

91

21

21

28

6,6

50

3,3

68

21

.48

0.2

21

.26

SA

MP

LE

DA

TE

15

-Jun

62

78

,13

41

86

1,2

69

97

89

1,5

78

49

12

12

12

86

,64

33

,36

53

1.5

10

.25

1.2

6B

OD

5, m

g/L

66

06

40

8,3

04

19

01

,29

69

99

11

,61

15

01

21

61

31

6,7

82

3,4

35

41

.48

0.1

61

.33

TK

N, m

g/L

50

.96

30

8,1

68

18

71

,27

59

88

91

,58

44

93

21

31

29

6,6

71

3,3

79

51

.39

0.1

11

.28

NH

3-N

, mg

/L1

5.1

58

97

,63

51

75

1,1

92

91

83

1,4

81

46

01

99

12

06

,23

53

,15

86

1.3

50

.11

1.2

4F

DS

, mg

/L5

39

57

47

,44

01

70

1,1

61

89

81

1,4

43

44

91

94

11

76

,07

63

,07

77

1.3

80

.08

1.2

9S

ol.B

OD

5, m

g/L

---

58

57

,58

11

73

1,1

83

91

83

1,4

70

45

71

98

11

96

,19

13

,13

68

1.3

50

.10

1.2

56

.55

72

7,4

15

17

01

,15

78

98

11

,43

84

47

19

31

17

6,0

55

3,0

67

91

.36

0.1

11

.25

57

77

,47

61

71

1,1

67

89

82

1,4

50

45

11

95

11

86

,10

53

,09

21

01

.42

0.2

21

.20

60

27

,80

61

79

1,2

18

93

85

1,5

14

47

12

03

12

36

,37

53

,22

91

11

.44

0.2

41

.19

BI-

AN

NU

AL

TE

ST

ING

60

97

,90

21

81

1,2

33

95

86

1,5

32

47

72

06

12

56

,45

33

,26

81

21

.44

0.1

91

.24

Mar

ch &

Se

pt.

61

17

,91

81

81

1,2

36

95

86

1,5

36

47

72

06

12

56

,46

73

,27

51

31

.27

0.0

71

.19

PA

RA

ME

TE

RV

AL

UE

53

86

,97

11

59

1,0

88

83

76

1,3

52

42

01

82

11

05

,69

32

,88

31

41

.30

0.1

61

.14

55

17

,14

41

63

1,1

15

86

78

1,3

86

43

11

86

11

35

,83

42

,95

51

51

.34

0.0

81

.26

6.5

SA

MP

LE

DA

TE

3-M

ar5

67

7,3

52

16

81

,14

78

88

01

,42

64

43

19

21

16

6,0

04

3,0

41

16

1.3

30

.14

1.1

9N

a, m

g/L

10

35

65

7,3

29

16

81

,14

48

88

01

,42

14

42

19

11

15

5,9

85

3,0

32

17

0.1

40

.08

0.0

6C

a, m

g/L

7.9

59

76

41

71

19

98

14

84

62

01

26

24

31

61

81

.35

0.1

41

.21

Mg

, mg

/L7

.25

73

7,4

32

17

01

,16

08

98

11

,44

14

48

19

41

17

6,0

70

3,0

74

19

1.3

60

.19

1.1

8K

, mg

/L1

28

57

87

,50

01

72

1,1

70

90

82

1,4

55

45

21

95

11

86

,12

53

,10

22

01

.36

0.2

01

.16

Cl,

mg

/L3

9.8

57

77

,48

61

71

1,1

68

90

82

1,4

52

45

11

95

11

86

,11

43

,09

62

11

.34

0.2

01

.14

Sul

fate

-S, m

g/L

17

.25

69

7,3

73

16

91

,15

18

88

01

,43

04

45

19

21

16

6,0

22

3,0

50

22

1.3

20

.16

1.1

76

.7T

ota

l-P, m

g/L

10

.45

62

7,2

92

16

71

,13

88

78

01

,41

44

40

19

01

15

5,9

55

3,0

16

23

1.2

40

.15

1.0

9A

lkal

inity

, mg

/L2

73

52

76

,83

31

56

1,0

66

82

75

1,3

25

41

21

78

10

85

,58

02

,82

62

41

.23

0.1

61

.07

52

36

,78

01

55

1,0

58

81

74

1,3

15

40

91

77

10

75

,53

72

,80

42

51

.25

0.1

71

.08

53

16

,88

61

58

1,0

75

82

75

1,3

35

41

51

79

10

95

,62

42

,84

82

61

.25

0.1

11

.15

53

26

,90

21

58

1,0

77

83

75

1,3

39

41

61

80

10

95

,63

72

,85

52

71

.22

0.0

41

.18

51

96

,73

01

54

1,0

50

81

73

1,3

05

40

61

75

10

65

,49

62

,78

42

81

.26

0.0

31

.23

53

56

,93

21

59

1,0

82

83

76

1,3

44

41

81

81

10

95

,66

12

,86

72

91

.24

0.0

11

.22

7.1

52

56

,80

91

56

1,0

63

82

74

1,3

21

41

11

77

10

75

,56

12

,81

73

01

.26

0.0

21

.24

53

66

,95

11

59

1,0

85

83

76

1,3

48

41

91

81

11

05

,67

72

,87

5

TO

TA

L3

9.1

34

.06

35

.07

MO

NT

HL

Y T

OT

AL

1

6,6

11

21

5,3

88

4,9

28

33

,61

42

,57

82

,35

04

1,7

72

12

,98

95

,61

33

,39

41

75

,90

08

9,0

92

MIN

.0

.14

0.0

10

.06

6.5

MA

X.

1.5

10

.25

1.3

37

.1

AV

G.

1.3

00

.14

1.1

76

.7Y

EA

R T

O D

AT

E

87

,81

71

,30

4,8

42

24

,01

82

14

,65

31

4,3

88

13

,94

22

67

,08

49

0,9

63

37

,23

11

9,4

27

1,1

82

,65

05

71

,18

3

YT

D2

51

.47

39

.62

21

1.8

YT

D T

OT

AL

DA

YS

:1

82

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.1

6F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

JU

LY

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

STO

TA

LM

AK

E-U

PP

RO

C.

WE

EK

LY

MO

NT

HL

Y T

ES

TS

DA

TE

FLO

WW

ATE

RW

AT

ER

pH

MG

/DM

G/D

MG

/DS

.U.

PA

RA

ME

TE

RV

AL

UE

TK

NB

OD

NH

3N

aC

aM

gK

Cl

SO

4-S

To

tal P

FD

SA

lk.

R

EM

AR

KS

11

.28

0.0

21

.26

66

67

,31

11

85

1,0

98

84

77

1,3

64

42

41

83

11

16

,10

72

,91

02

1.2

40

.01

1.2

3S

AM

PL

E D

AT

E6

-Jul

64

57

,08

21

80

1,0

63

82

74

1,3

21

41

11

78

10

75

,91

62

,81

83

1.2

30

.02

1.2

1B

OD

5, m

g/L

6

86

64

07

,02

71

78

1,0

55

81

74

1,3

11

40

81

76

10

75

,87

02

,79

74

1.2

10

.02

1.1

9T

KN

, mg

/L6

2.5

63

26

,93

81

76

1,0

42

80

73

1,2

95

40

31

74

10

55

,79

52

,76

15

1.2

10

.04

1.1

6N

H3

-N, m

g/L

17

.46

28

6,8

97

17

51

,03

67

97

21

,28

74

00

17

31

05

5,7

61

2,7

45

61

.20

0.0

31

.17

6.2

FD

S, m

g/L

5

73

62

56

,85

71

74

1,0

30

79

72

1,2

79

39

81

72

10

45

,72

82

,72

97

1.2

00

.01

1.1

9S

ol.B

OD

5, m

g/L

---

62

66

,87

41

74

1,0

32

79

72

1,2

83

39

91

72

10

45

,74

22

,73

58

1.1

30

.00

1.1

25

87

6,4

40

16

39

67

74

68

1,2

02

37

41

61

98

5,3

79

2,5

63

91

.11

0.0

11

.10

57

76

,33

51

61

95

17

36

61

,18

23

68

15

99

65

,29

22

,52

11

01

.10

0.0

11

.09

57

66

,31

81

60

94

97

36

61

,17

93

67

15

89

65

,27

72

,51

41

11

.11

0.0

01

.11

BI-

AN

NU

AL

TE

ST

ING

57

76

,33

81

61

95

27

36

71

,18

33

68

15

99

65

,29

42

,52

21

21

.04

0.0

21

.02

Mar

ch &

Se

pt.

54

25

,95

01

51

89

36

96

21

,11

03

45

14

99

04

,97

02

,36

81

31

.06

0.0

41

.03

7.1

PA

RA

ME

TE

RV

AL

UE

55

46

,08

21

54

91

37

06

41

,13

53

53

15

29

25

,08

02

,42

01

41

.06

0.0

70

.99

55

36

,07

21

54

91

27

06

41

,13

33

52

15

29

25

,07

22

,41

61

51

.06

0.1

40

.91

SA

MP

LE

DA

TE

3-M

ar5

51

6,0

43

15

39

07

70

63

1,1

28

35

11

52

92

5,0

48

2,4

05

Pla

nt D

own

16

1.0

40

.37

0.6

7N

a, m

g/L

10

35

42

5,9

53

15

18

94

69

62

1,1

11

34

51

49

90

4,9

73

2,3

69

Pla

nt D

own

17

1.0

00

.50

0.5

0C

a, m

g/L

7.9

52

35

,73

71

46

86

16

66

01

,07

03

33

14

48

74

,79

22

,28

3P

lant

Dow

n

18

1.0

00

.48

0.5

2M

g, m

g/L

7.2

52

15

,72

11

45

85

96

66

01

,06

83

32

14

38

74

,77

92

,27

7P

lant

Dow

n

19

0.0

00

.00

0.0

0K

, mg

/L1

28

Pla

nt D

own

20

0.0

00

.00

0.0

07

.9C

l, m

g/L

39

.8

P

lant

Dow

n

21

0.0

00

.00

0.0

0S

ulfa

te-S

, mg

/L1

7.2

Pla

nt D

own

22

0.0

00

.00

0.0

0T

ota

l-P, m

g/L

10

.4

P

lant

Dow

n

23

0.0

00

.00

0.0

0A

lkal

inity

, mg

/L2

73

Pla

nt D

own

24

1.0

60

.77

0.2

95

52

6,0

63

15

49

10

70

64

1,1

31

35

21

52

92

5,0

64

2,4

13

Pla

nt D

own

25

1.0

80

.79

0.2

95

63

6,1

75

15

79

27

71

65

1,1

52

35

81

55

94

5,1

58

2,4

57

Pla

nt D

own

26

1.1

00

.77

0.3

35

73

6,2

91

16

09

45

72

66

1,1

74

36

51

58

95

5,2

55

2,5

03

Pla

nt D

own

27

1.0

30

.73

0.3

07

.75

39

5,9

13

15

08

88

68

62

1,1

03

34

31

48

90

4,9

39

2,3

53

Pla

nt D

own

28

1.0

30

.74

0.3

05

39

5,9

13

15

08

88

68

62

1,1

03

34

31

48

90

4,9

39

2,3

53

Pla

nt D

own

29

1.1

00

.73

0.3

75

75

6,3

08

16

09

47

73

66

1,1

77

36

61

58

96

5,2

69

2,5

10

Pla

nt D

own

30

1.7

00

.71

0.9

98

86

9,7

26

24

71

,46

01

12

10

21

,81

55

64

24

41

47

8,1

24

3,8

71

Pla

nt D

own

31

0.0

00

.00

0.0

0

P

lant

Dow

n

TO

TA

L2

8.3

87

.05

21

.33

MO

NT

HL

Y T

OT

AL

1

4,7

93

16

2,3

65

4,1

18

24

,37

81

,87

01

,70

43

0,2

95

9,4

20

4,0

71

2,4

62

13

5,6

19

64

,61

5

MIN

.0

.00

0.0

00

.00

6.2

MA

X.

1.7

00

.79

1.2

67

.9

AV

G.

0.9

20

.23

0.6

97

.2Y

EA

R T

O D

AT

E

10

2,6

09

1,4

67

,20

72

8,1

36

23

9,0

31

16

,25

81

5,6

46

29

7,3

79

10

0,3

83

41

,30

12

1,8

88

1,3

18

,26

96

35

,79

8

YT

D2

79

.85

46

.67

23

3.2

YT

D T

OT

AL

DA

YS

:2

13

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.0

9F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

AU

GU

ST

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LOW

WA

TE

RW

AT

ER

pH

MG

/DM

G/D

MG

/DS

.U.

PA

RA

ME

TE

RV

AL

UE

TK

NB

OD

NH

3N

aC

aM

gK

Cl

SO

4-S

To

tal P

FD

SA

lk.

R

EM

AR

KS

10

.00

0.0

00

.00

7.8

Pow

er O

utag

e

20

.00

0.0

00

.00

SA

MP

LE

DA

TE

17

-Aug

07

04

00

51

10

12

10

Pla

nt D

own

30

.34

0.0

00

.34

BO

D5

, mg

/L

1

98

15

55

73

29

02

22

03

60

11

24

82

99

23

76

8P

lant

Dow

n

40

.40

0.4

00

.00

TK

N, m

g/L

5.3

18

66

23

34

42

62

44

28

13

35

83

51

,09

79

13

Pla

nt D

own

51

.41

0.6

80

.73

NH

3-N

, mg

/L1

.06

22

,32

11

21

,20

79

38

41

,50

04

66

20

21

22

3,8

44

3,2

00

Pla

nt D

own

61

.49

0.7

10

.79

FD

S, m

g/L

32

86

62

,46

71

21

,28

39

89

01

,59

54

96

21

41

30

4,0

86

3,4

01

Pla

nt D

own

71

.50

0.6

70

.83

So

l.BO

D5

, mg

/L--

-6

62

,48

01

31

,29

09

99

01

,60

34

98

21

51

30

4,1

08

3,4

19

Pla

nt D

own

81

.55

0.6

30

.92

6.3

EC

, dS

/m5

12

68

2,5

59

13

1,3

31

10

29

31

,65

45

14

22

21

34

4,2

39

3,5

28

Pla

nt D

own

91

.13

0.4

50

.68

50

1,8

73

99

74

75

68

1,2

11

37

61

63

98

3,1

02

2,5

82

Bea

ns O

nly

10

0.9

40

.48

0.4

64

21

,55

28

80

76

25

61

,00

33

12

13

58

22

,57

02

,13

9B

eans

Onl

y

11

1.0

30

.54

0.5

04

61

,70

29

88

56

86

21

,10

03

42

14

88

92

,82

02

,34

7B

eans

Onl

y

12

1.1

00

.57

0.5

3M

arch

& S

ep

t.4

91

,81

69

94

57

26

61

,17

43

65

15

89

53

,00

82

,50

4B

eans

Onl

y

13

1.0

70

.63

0.4

4P

AR

AM

ET

ER

VA

LU

E4

71

,77

09

92

17

16

41

,14

43

56

15

49

32

,93

22

,44

0B

eans

Onl

y

14

1.0

60

.61

0.4

44

71

,74

79

90

97

06

41

,12

93

51

15

29

22

,89

42

,40

9B

eans

Onl

y

15

1.0

60

.37

0.6

96

.9S

AM

PL

E D

AT

E3

-Mar

47

1,7

46

99

08

70

63

1,1

28

35

11

52

92

2,8

92

2,4

07

Pot

atoe

s &

Bea

ns

16

1.0

50

.33

0.7

2N

a, m

g/L

10

34

61

,73

19

90

16

96

31

,11

93

48

15

09

12

,86

82

,38

7fro

m h

ere

on

17

1.1

10

.10

1.0

1C

a, m

g/L

7.9

49

1,8

33

99

54

73

67

1,1

85

36

91

59

96

3,0

37

2,5

28

18

1.0

40

.00

1.0

4M

g, m

g/L

7.2

46

1,7

23

98

96

69

63

1,1

14

34

61

50

91

2,8

55

2,3

76

19

1.0

80

.01

1.0

7K

, mg

/L1

28

48

1,7

90

99

31

71

65

1,1

57

36

01

55

94

2,9

65

2,4

68

20

1.0

70

.01

1.0

6C

l, m

g/L

39

.84

71

,76

19

91

67

06

41

,13

93

54

15

39

32

,91

82

,42

92

11

.04

0.0

01

.04

Sul

fate

-S, m

g/L

17

.24

61

,71

49

89

16

86

21

,10

83

44

14

99

02

,83

92

,36

32

21

.03

0.0

01

.03

6.1

To

tal-P

, mg

/L1

0.4

46

1,7

05

98

87

68

62

1,1

02

34

31

48

90

2,8

25

2,3

51

23

1.0

30

.00

1.0

3A

lkal

inity

, mg

/L2

73

45

1,6

97

98

83

68

62

1,0

97

34

11

47

89

2,8

11

2,3

40

24

1.0

60

.00

1.0

64

71

,75

29

91

17

06

41

,13

33

52

15

29

22

,90

22

,41

52

51

.07

0.0

01

.07

47

1,7

64

99

17

70

64

1,1

40

35

51

53

93

2,9

22

2,4

32

26

1.0

70

.01

1.0

64

71

,76

59

91

87

06

41

,14

13

55

15

39

32

,92

42

,43

42

71

.15

0.0

71

.08

51

1,9

05

10

99

17

66

91

,23

23

83

16

51

00

3,1

56

2,6

27

28

1.1

90

.07

1.1

35

31

,97

11

01

,02

57

97

21

,27

43

96

17

11

04

3,2

65

2,7

17

29

1.2

10

.03

1.1

86

.55

31

,99

61

01

,03

88

07

31

,29

04

01

17

31

05

3,3

06

2,7

52

30

1.1

90

.06

1.1

35

31

,96

41

01

,02

27

87

11

,27

03

95

17

11

03

3,2

54

2,7

08

31

1.1

90

.00

1.1

95

31

,96

21

01

,02

17

87

11

,26

93

94

17

01

03

3,2

51

2,7

06

TO

TA

L3

1.6

77

.44

24

.23

MO

NT

HL

Y T

OT

AL

1

,40

05

2,2

91

26

42

7,2

02

2,0

86

1,9

01

33

,80

41

0,5

11

4,5

42

2,7

47

86

,62

37

2,0

98

MIN

.0

.00

0.0

00

.00

6.1

MA

X.

1.5

50

.71

1.1

97

.8

AV

G.

1.0

20

.24

0.7

86

.7Y

EA

R T

O D

AT

E

10

4,0

09

1,5

19

,49

82

8,4

00

26

6,2

33

18

,34

41

7,5

48

33

1,1

83

11

0,8

94

45

,84

42

4,6

35

1,4

04

,89

27

07

,89

5

YT

D3

11

.51

54

.11

25

7.4

YT

D T

OT

AL

DA

YS

:2

44

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.0

5F

igur

e 3

BI-

AN

NU

AL

TE

ST

ING

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GTO

N

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

SE

PT

EM

BE

R20

16C

AL

EN

DA

R Y

EA

R

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

.W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.1

90

.01

1.1

85

00

5,8

56

19

71

,02

19

16

81

,06

06

68

46

49

45

,38

12

,97

32

1.1

70

.01

1.1

6S

AM

PL

E D

AT

E1

4-S

ep

49

35

,77

51

94

1,0

07

90

67

1,0

46

65

94

57

93

5,3

06

2,9

32

31

.06

0.1

30

.94

BO

D5

, mg

/L

5

91

44

75

,22

91

76

91

18

16

19

47

59

64

14

84

4,8

04

2,6

54

41

.21

0.1

11

.09

TK

N, m

g/L

50

.55

08

5,9

47

20

01

,03

69

36

91

,07

76

78

47

19

65

,46

43

,01

95

1.2

20

.03

1.1

9N

H3

-N, m

g/L

19

.95

15

6,0

29

20

31

,05

19

47

01

,09

26

88

47

79

75

,54

03

,06

16

1.1

60

.01

1.1

5F

DS

, mg

/L5

43

48

75

,69

41

92

99

28

96

61

,03

16

49

45

19

25

,23

22

,89

07

1.2

00

.03

1.1

76

.5S

ol.B

OD

5, m

g/L

---

50

65

,92

11

99

1,0

32

92

69

1,0

72

67

54

69

95

5,4

40

3,0

05

81

.19

0.0

11

.18

EC

, uS

97

25

02

5,8

73

19

81

,02

39

16

91

,06

36

70

46

59

45

,39

62

,98

19

1.2

80

.08

1.2

05

40

6,3

19

21

31

,10

19

87

41

,14

47

21

50

01

02

5,8

06

3,2

08

10

1.0

60

.07

0.9

94

47

5,2

29

17

69

11

81

61

94

75

96

41

48

44

,80

42

,65

41

11

.14

0.0

21

.12

BI-

AN

NU

AL

TE

ST

ING

48

05

,61

21

89

97

88

76

61

,01

66

40

44

49

05

,15

62

,84

91

21

.15

0.0

11

.14

Mar

ch &

Se

pt.

48

35

,65

61

90

98

68

86

61

,02

46

45

44

89

15

,19

72

,87

11

31

.18

0.0

11

.16

PA

RA

ME

TE

RV

AL

UE

49

55

,79

81

95

1,0

11

90

68

1,0

50

66

14

59

93

5,3

27

2,9

43

14

1.2

10

.03

1.1

96

.95

11

5,9

79

20

11

,04

29

37

01

,08

36

82

47

39

65

,49

43

,03

51

51

.13

0.0

11

.12

SA

MP

LE

DA

TE

14

-Se

p4

75

5,5

54

18

79

68

86

65

1,0

06

63

34

40

89

5,1

03

2,8

19

16

1.0

30

.00

1.0

3N

a, m

g/L

10

34

36

5,0

97

17

28

88

79

60

92

35

81

40

48

24

,68

32

,58

71

71

.02

0.0

11

.01

Ca,

mg

/L9

.24

30

5,0

32

16

98

77

78

59

91

15

74

39

88

14

,62

42

,55

41

81

.07

0.0

31

.04

Mg

, mg

/L6

.94

51

5,2

73

17

89

19

82

62

95

56

01

41

88

54

,84

42

,67

61

91

.14

0.0

31

.12

K, m

g/L

10

74

82

5,6

42

19

09

83

88

66

1,0

21

64

34

47

91

5,1

84

2,8

64

20

1.0

70

.01

1.0

6C

l, m

g/L

67

.44

49

5,2

60

17

79

17

82

61

95

26

00

41

78

54

,83

32

,67

02

10

.97

0.0

00

.97

6.8

Sul

fate

-S, m

g/L

46

.84

08

4,7

74

16

18

32

74

56

86

45

44

37

87

74

,38

62

,42

32

20

.98

0.0

00

.98

To

tal-P

, mg

/L9

.54

13

4,8

36

16

38

43

75

56

87

65

51

38

37

84

,44

32

,45

52

31

.05

0.0

11

.04

Alk

alin

ity, m

g/L

30

04

43

5,1

87

17

59

04

81

61

93

95

92

41

18

34

,76

52

,63

32

41

.22

0.1

51

.07

51

25

,99

02

02

1,0

44

93

70

1,0

84

68

34

74

96

5,5

03

3,0

41

25

1.2

60

.33

0.9

35

30

6,2

00

20

91

,08

19

77

21

,12

37

07

49

11

00

5,6

97

3,1

47

26

1.1

30

.12

1.0

14

76

5,5

68

18

79

70

87

65

1,0

08

63

54

41

89

5,1

16

2,8

26

27

1.0

30

.01

1.0

34

36

5,1

00

17

28

89

79

60

92

35

82

40

48

24

,68

52

,58

92

81

.08

0.0

01

.07

7.2

45

35

,29

91

78

92

48

26

29

59

60

44

20

85

4,8

69

2,6

90

29

1.2

10

.01

1.2

05

10

5,9

64

20

11

,03

99

37

01

,08

06

80

47

29

65

,47

93

,02

73

01

.28

0.0

51

.23

53

86

,30

12

12

1,0

98

98

74

1,1

41

71

94

99

10

15

,78

93

,19

9

TO

TA

L3

4.0

81

.33

32

.75

MO

NT

HL

Y T

OT

AL

1

4,3

55

16

7,9

94

5,6

57

29

,27

82

,61

51

,96

13

0,4

15

19

,15

91

3,3

03

2,7

00

15

4,3

50

85

,27

6

MIN

.0

.97

0.0

00

.93

6.5

MA

X.

1.2

80

.33

1.2

37

.2

AV

G.

1.1

40

.04

1.0

96

.9Y

EA

R T

O D

AT

E *

11

8,3

64

1,6

87

,49

23

4,0

57

29

5,5

11

20

,96

01

9,5

09

36

1,5

99

13

0,0

53

59

,14

72

7,3

35

1,5

59

,24

27

93

,17

2

YT

D3

45

.60

55

.44

29

0.2

YT

D T

OT

AL

DA

YS

:2

74

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.0

6F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST-

5213

OC

TO

BE

R20

16

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

.W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.2

10

.08

1.1

24

17

5,9

10

14

31

,03

79

36

91

,07

76

79

47

19

65

,26

63

,02

02

1.2

10

.05

1.1

6S

AM

PL

E D

AT

E1

2-O

ct4

19

5,9

35

14

41

,04

19

37

01

,08

26

81

47

39

65

,28

83

,03

33

1.1

90

.31

0.8

8B

OD

5, m

g/L

5

87

41

25

,84

71

41

1,0

26

92

69

1,0

66

67

14

66

95

5,2

09

2,9

88

41

.16

0.1

31

.03

TK

N, m

g/L

41

.44

00

5,6

78

13

79

96

89

67

1,0

35

65

24

53

92

5,0

59

2,9

02

51

.14

0.0

71

.07

7.1

NH

3-N

, mg

/L1

4.2

39

45

,59

31

35

98

18

86

61

,01

96

42

44

69

14

,98

32

,85

86

1.1

10

.14

0.9

7F

DS

, mg

/L5

23

38

25

,41

01

31

94

98

56

49

86

62

14

31

88

4,8

21

2,7

65

71

.19

0.1

31

.05

So

l.BO

D5

, mg

/L--

-4

09

5,8

03

14

01

,01

89

16

81

,05

86

66

46

39

45

,17

02

,96

68

1.2

20

.10

1.1

2E

.C, u

S9

21

42

25

,98

61

45

1,0

50

94

70

1,0

91

68

74

77

97

5,3

34

3,0

60

91

.26

0.1

11

.15

43

46

,15

11

49

1,0

79

96

72

1,1

21

70

64

90

10

05

,48

13

,14

41

01

.25

0.1

01

.16

43

26

,13

01

48

1,0

76

96

72

1,1

17

70

44

89

99

5,4

61

3,1

33

11

1.1

80

.09

1.0

9B

I-A

NN

UA

L T

ES

TIN

G4

08

5,7

83

14

01

,01

59

16

81

,05

46

64

46

19

45

,15

32

,95

61

21

.23

0.0

41

.18

6.7

Mar

ch &

Se

pt.

42

36

,00

21

45

1,0

53

94

71

1,0

94

68

94

79

97

5,3

48

3,0

68

13

1.2

90

.05

1.2

4P

AR

AM

ET

ER

VA

LU

E4

44

6,3

01

15

21

,10

69

97

41

,14

97

24

50

21

02

5,6

14

3,2

21

14

1.2

70

.04

1.2

34

38

6,2

06

15

01

,08

99

77

31

,13

17

13

49

51

00

5,5

29

3,1

72

15

1.2

60

.00

1.2

6S

AM

PL

E D

AT

E1

4-S

ep

43

66

,18

11

50

1,0

85

97

73

1,1

27

71

04

93

10

05

,50

73

,15

91

61

.30

0.0

11

.29

Na,

mg

/L1

03

44

86

,35

61

54

1,1

15

10

07

51

,15

97

30

50

71

03

5,6

63

3,2

48

17

1.2

90

.03

1.2

6C

a, m

g/L

9.2

44

46

,30

11

52

1,1

06

99

74

1,1

48

72

35

02

10

25

,61

43

,22

01

81

.29

0.0

11

.28

Mg

, mg

/L6

.94

47

6,3

35

15

31

,11

29

97

41

,15

57

27

50

51

03

5,6

45

3,2

38

19

1.2

70

.06

1.2

26

.1K

, mg

/L1

07

43

96

,21

91

50

1,0

91

97

73

1,1

34

71

44

96

10

15

,54

13

,17

82

01

.23

0.0

31

.20

Cl,

mg

/L6

7.4

42

66

,04

21

46

1,0

60

95

71

1,1

01

69

44

82

98

5,3

83

3,0

88

21

1.2

60

.05

1.2

1S

ulfa

te-S

, mg

/L4

6.8

43

66

,18

21

50

1,0

85

97

73

1,1

27

71

04

93

10

05

,50

83

,15

92

21

.21

0.0

51

.16

To

tal-P

, mg

/L9

.54

18

5,9

25

14

31

,04

09

37

01

,08

06

80

47

29

65

,27

93

,02

82

31

.15

0.0

01

.15

Alk

alin

ity, m

g/L

30

03

97

5,6

26

13

69

87

88

66

1,0

26

64

64

49

91

5,0

13

2,8

75

24

1.1

90

.00

1.1

94

10

5,8

14

14

11

,02

09

16

81

,06

06

68

46

49

45

,18

02

,97

12

51

.22

0.0

01

.22

42

25

,98

91

45

1,0

51

94

70

1,0

92

68

84

77

97

5,3

36

3,0

61

26

1.2

30

.06

1.1

67

.74

24

6,0

09

14

51

,05

49

47

11

,09

56

90

47

99

75

,35

43

,07

12

71

.26

0.1

11

.15

43

46

,15

51

49

1,0

80

96

72

1,1

22

70

74

91

10

05

,48

33

,14

52

81

.28

0.0

61

.22

44

26

,27

11

52

1,1

00

98

74

1,1

43

72

05

00

10

15

,58

73

,20

52

91

.20

0.0

61

.14

41

35

,85

81

42

1,0

28

92

69

1,0

68

67

34

67

95

5,2

19

2,9

94

30

1.1

40

.04

1.1

03

94

5,5

93

13

59

81

88

66

1,0

19

64

24

46

91

4,9

83

2,8

58

31

1.1

60

.13

1.0

34

00

5,6

66

13

79

94

89

67

1,0

33

65

14

52

92

5,0

48

2,8

96

TO

TA

L3

7.8

42

.15

35

.70

MO

NT

HL

Y T

OT

AL

1

3,0

66

18

5,2

59

4,4

82

32

,50

72

,90

42

,17

83

3,7

69

21

,27

21

4,7

70

2,9

98

16

5,0

60

94

,68

1

MIN

.1

.11

0.0

00

.88

6.1

MA

X.

1.3

00

.31

1.2

97

.7

AV

G.

1.2

20

.07

1.1

56

.9Y

EA

R T

O D

AT

E

13

1,4

30

1,8

72

,75

13

8,5

38

32

8,0

18

23

,86

32

1,6

87

39

5,3

68

15

1,3

25

73

,91

73

0,3

34

1,7

24

,30

38

87

,85

2

YT

D3

83

.44

57

.59

32

5.9

YT

D T

OT

AL

DA

YS

:3

05

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.0

7F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GTO

N

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-521

3

NO

VE

MB

ER

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.1

10

.31

0.8

03

40

4,3

69

96

95

38

56

49

90

62

44

33

88

4,5

36

2,7

77

21

.11

0.4

60

.65

SA

MP

LE

DA

TE

9-N

ov

34

04

,36

99

69

53

85

64

99

06

24

43

38

84

,53

62

,77

73

1.2

10

.75

0.4

6B

OD

5, m

g/L

47

23

70

4,7

56

10

51

,03

89

37

01

,07

86

79

47

29

64

,93

73

,02

34

1.2

60

.80

0.4

5T

KN

, mg

/L3

6.7

38

44

,94

51

09

1,0

79

96

72

1,1

21

70

64

90

10

05

,13

33

,14

35

1.2

10

.09

1.1

2N

H3

-N, m

g/L

10

.43

70

4,7

56

10

51

,03

89

37

01

,07

86

79

47

29

64

,93

73

,02

36

1.2

60

.56

0.7

0F

DS

, mg

/L4

90

38

44

,94

51

09

1,0

79

96

72

1,1

21

70

64

90

10

05

,13

33

,14

37

1.2

50

.51

0.7

4S

ol.B

OD

5, m

g/L

---

38

34

,92

71

09

1,0

75

96

72

1,1

17

70

44

89

99

5,1

15

3,1

32

81

.28

0.3

50

.93

E.C

., uS

(O

ct)

92

13

93

5,0

51

11

11

,10

29

87

41

,14

57

21

50

11

02

5,2

44

3,2

10

91

.32

0.3

40

.98

6.9

40

35

,17

71

14

1,1

30

10

17

61

,17

47

39

51

31

04

5,3

75

3,2

91

10

1.2

40

.22

1.0

23

81

4,8

99

10

81

,06

99

57

21

,11

17

00

48

69

95

,08

63

,11

41

11

.15

0.1

31

.02

BI-

AN

NU

AL

TE

ST

ING

35

34

,54

01

00

99

18

86

61

,02

96

48

45

09

14

,71

32

,88

61

21

.17

0.1

90

.98

Mar

ch &

Se

pt.

35

84

,60

11

01

1,0

04

90

67

1,0

43

65

74

56

93

4,7

76

2,9

24

13

1.2

00

.18

1.0

2P

AR

AM

ET

ER

VA

LU

E3

66

4,7

08

10

41

,02

79

26

91

,06

76

72

46

79

54

,88

82

,99

31

41

.18

0.1

21

.06

36

24

,66

01

03

1,0

17

91

68

1,0

56

66

54

62

94

4,8

37

2,9

62

15

1.2

20

.01

1.2

1S

AM

PL

E D

AT

E1

4-S

ep

37

24

,78

41

05

1,0

44

93

70

1,0

84

68

34

74

96

4,9

66

3,0

40

16

1.1

80

.00

1.1

87

.1N

a, m

g/L

10

33

60

4,6

32

10

21

,01

19

06

81

,05

06

61

45

99

34

,80

92

,94

41

71

.20

0.0

01

.20

Ca,

mg

/L9

.23

68

4,7

35

10

41

,03

39

26

91

,07

36

76

46

99

54

,91

63

,01

01

81

.12

0.0

01

.12

Mg

, mg

/L6

.93

42

4,4

05

97

96

18

66

49

99

62

94

37

89

4,5

73

2,8

00

19

1.1

00

.00

1.1

0K

, mg

/L1

07

33

84

,34

39

69

48

85

63

98

46

20

43

18

74

,50

82

,76

02

01

.09

0.0

01

.09

Cl,

mg

/L6

7.4

33

54

,30

49

59

39

84

63

97

66

15

42

78

74

,46

82

,73

62

11

.05

0.0

01

.05

Sul

fate

-S, m

g/L

46

.83

20

4,1

19

91

89

98

06

09

34

58

84

08

83

4,2

76

2,6

18

22

1.2

10

.02

1.1

9T

ota

l-P, m

g/L

9.5

37

04

,75

81

05

1,0

38

93

70

1,0

79

67

94

72

96

4,9

40

3,0

24

23

1.2

50

.04

1.2

17

.0A

lkal

inity

, mg

/L3

00

38

24

,91

61

08

1,0

73

96

72

1,1

14

70

24

87

99

5,1

03

3,1

24

24

1.2

00

.01

1.1

93

68

4,7

39

10

41

,03

49

26

91

,07

46

77

47

09

54

,92

03

,01

22

51

.20

0.0

01

.20

36

74

,71

41

04

1,0

29

92

69

1,0

69

67

34

67

95

4,8

94

2,9

96

26

1.2

50

.10

1.1

63

83

4,9

30

10

91

,07

69

67

21

,11

87

04

48

99

95

,11

83

,13

32

71

.30

0.1

01

.19

39

75

,11

11

13

1,1

15

10

07

51

,15

97

30

50

71

03

5,3

06

3,2

49

28

1.2

50

.11

1.1

43

83

4,9

25

10

91

,07

59

67

21

,11

67

03

48

89

95

,11

23

,13

02

91

.43

0.1

31

.29

43

65

,61

31

24

1,2

25

10

98

21

,27

28

02

55

71

13

5,8

27

3,5

68

30

1.3

00

.18

1.1

27

.23

98

5,1

17

11

31

,11

71

00

75

1,1

60

73

15

07

10

35

,31

33

,25

3

TO

TA

L3

6.2

95

.72

30

.57

MO

NT

HL

Y T

OT

AL

1

1,1

07

14

2,8

47

3,1

47

31

,17

22

,78

42

,08

83

2,3

83

20

,39

81

4,1

64

2,8

75

14

8,2

95

90

,79

3

MIN

.1

.05

0.0

00

.45

6.9

MA

X.

1.4

30

.80

1.2

97

.2

AV

G.

1.2

10

.19

1.0

27

.1Y

EA

R T

O D

AT

E

14

2,5

37

2,0

15

,59

84

1,6

86

35

9,1

90

26

,64

72

3,7

75

42

7,7

51

17

1,7

23

88

,08

13

3,2

09

1,8

72

,59

79

78

,64

5

YT

D4

19

.73

63

.31

35

6.4

2

Y

TD

TO

TA

L D

AY

S:

33

5

Y

TD

AN

NU

AL

AV

ER

AG

E D

AIL

Y F

LO

W, M

G/D

AY

:1

.06

Fig

ure

3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

DE

CE

MB

ER

2016

L

AB

OR

AT

OR

Y A

NA

LY

SE

ST

OT

AL

MA

KE

-UP

PR

OC

. W

EE

KL

Y M

ON

TH

LY

TE

ST

SD

AT

EF

LO

WW

AT

ER

WA

TE

Rp

HM

G/D

MG

/DM

G/D

S.U

.P

AR

AM

ET

ER

VA

LU

ET

KN

BO

DN

H3

Na

Ca

Mg

KC

lS

O4

-ST

ota

l PF

DS

Alk

.

RE

MA

RK

S1

1.2

10

.22

0.9

95

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

62

1.2

10

.16

1.0

5S

AM

PL

E D

AT

E7

-De

c5

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

63

1.2

10

.20

1.0

1B

OD

5, m

g/L

75

65

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

6m

ain

flow

met

er

at

41

.21

0.2

60

.95

TK

N, m

g/L

54

.25

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

6P

lan

t fa

iled;

ave

rage

51

.21

0.2

50

.96

NH

3-N

, mg

/L1

5.6

54

77

,62

71

57

1,0

39

93

70

1,0

79

68

04

72

96

6,0

23

3,0

26

was

tew

ater

flow

from

61

.21

0.1

31

.08

FD

S, m

g/L

59

75

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

6N

ovem

ber

used

as

71

.21

0.2

40

.97

6.0

So

l.BO

D5

, mg

/L--

-5

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

6be

st e

stim

ate

81

.21

0.2

11

.00

54

77

,62

71

57

1,0

39

93

70

1,0

79

68

04

72

96

6,0

23

3,0

26

91

.21

0.0

11

.20

54

77

,62

71

57

1,0

39

93

70

1,0

79

68

04

72

96

6,0

23

3,0

26

10

1.2

10

.05

1.1

65

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

61

11

.21

0.2

11

.00

BI-

AN

NU

AL

TE

ST

ING

54

77

,62

71

57

1,0

39

93

70

1,0

79

68

04

72

96

6,0

23

3,0

26

12

1.2

10

.23

0.9

8M

arch

& S

ep

t.5

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

61

31

.21

0.1

51

.06

PA

RA

ME

TE

RV

AL

UE

54

77

,62

71

57

1,0

39

93

70

1,0

79

68

04

72

96

6,0

23

3,0

26

14

1.2

10

.38

0.8

35

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

61

51

.21

0.1

01

.11

SA

MP

LE

DA

TE

14

-Se

p5

47

7,6

27

15

71

,03

99

37

01

,07

96

80

47

29

66

,02

33

,02

61

60

.00

0.0

00

.00

Na,

mg

/L1

03

17

0.0

00

.00

0.0

0C

a, m

g/L

9.2

18

0.0

00

.00

0.0

0M

g, m

g/L

6.9

19

0.0

00

.00

0.0

0K

, mg

/L1

07

20

0.0

00

.00

0.0

0C

l, m

g/L

67

.4

2

10

.00

0.0

00

.00

Sul

fate

-S, m

g/L

46

.8

2

20

.00

0.0

00

.00

To

tal-P

, mg

/L9

.5

P

lan

t D

own

23

0.0

00

.00

0.0

0A

lkal

inity

, mg

/L3

00

until

1/3

/17

24

0.0

00

.00

0.0

0

2

50

.00

0.0

00

.00

26

0.0

00

.00

0.0

0

2

70

.00

0.0

00

.00

28

0.0

00

.00

0.0

0

2

90

.00

0.0

00

.00

30

0.0

00

.00

0.0

0

3

10

.00

0.0

00

.00

TO

TA

L1

8.1

42

.79

15

.35

MO

NT

HL

Y T

OT

AL

8

,20

21

14

,39

92

,36

11

5,5

86

1,3

92

1,0

44

16

,19

11

0,1

99

7,0

82

1,4

38

90

,33

94

5,3

96

MIN

.0

.00

0.0

00

.00

6.0

MA

X.

1.2

10

.38

1.2

06

.0

AV

G.

0.5

90

.09

0.5

06

.0Y

EA

R T

O D

AT

E

15

0,7

38

2,1

29

,99

74

4,0

47

37

4,7

77

28

,04

02

4,8

19

44

3,9

42

18

1,9

22

95

,16

33

4,6

46

1,9

62

,93

61

,02

4,0

42

YT

D4

37

.87

66

.09

92

37

1.8

YT

D T

OT

AL

DA

YS

:3

66

YT

D A

NN

UA

L A

VE

RA

GE

DA

ILY

FL

OW

, MG

/DA

Y:

1.0

2F

igur

e 3

ES

TIM

AT

ED

PO

UN

DS

PE

R D

AY

BA

SIC

AM

ER

ICA

N F

OO

DS

MO

SE

S L

AK

E W

AS

HIN

GT

ON

PR

OC

ES

S W

AT

ER

MO

NIT

OR

ING

PE

RM

IT #

ST

-52

13

APPENDIX B

MONITORING AND IRRIGATION WATER WELL DATA

January 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 25-Jan-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1053.50 1083.13Temperature, C 13.1 14.0Temperature, F 55.6 57.2pH (s.u.) 7.5 7.6TKN (mg/L) 0.3 <0.3NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 17.1 6.0

TDS (mg/L) 667 539

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

January 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 25-Jan-16

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.61 1065.65 1054.43Temperature, C 15.6 14.0 14.4Temperature, F 60.1 57.2 57.9pH 7.8 7.8 7.8TKN (mg/L) 0.5 0.6 <0.3NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 0.5 17.7 41.1TDS (mg/L) 513 688 569

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

January 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1133.20 1126.63 1119.23 1043.20 1080.21Temperature, C 14.9 19.0 14.8 13.9 13.2Temperature, F 58.8 66.2 58.6 57.0 55.8pH 7.5 7.6 7.0 7.7 7.6TKN (mg/L) 1.1 0.6 1.5 <0.3 0.8NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.3 2.7 33.8 57.9 55.4TDS (mg/L) 345 558 1117 948 1153

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - analysis was missed by laboratory, will be picked up next month

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

25-Jan-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2

MW6 MW10

MW13 Drinking Water Standard

`

February 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 16-Feb-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1054.49 1083.20Temperature, C 13.4 14.2Temperature, F 56.1 57.6pH (s.u.) 7.4 7.5TKN (mg/L) 1.5 1.1NH3-N (mg/L)(Feb,May,Aug,Nov) <0.08 <0.08Total-P (mg/L)(Feb,May,Aug,Nov) <0.02

NO3+NO2-N (mg/L) 15.0 6.4

TDS (mg/L) 669 540

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

February 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 16-Feb-16

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.81 1074.15 1055.41Temperature, C 16.0 14.4 14.6Temperature, F 60.8 57.9 58.3pH 7.8 7.6 7.6TKN (mg/L) 0.5 0.6 <0.3NH3-N (mg/L)(Feb,May,Aug,Nov) <0.08 <0.08 <0.08NO3+NO2-N (mg/L) 0.6 18.0 42.8TDS (mg/L) 523 647 645

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

February 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1132.85 1124.14 1119.69 1044.00 1081.11Temperature, C 15.2 19.3 15.1 14.3 13.8Temperature, F 59.4 66.7 59.2 57.7 56.8pH 7.3 7.3 6.7 7.5 7.3TKN (mg/L) 0.8 <0.3 1.9 1.7 <0.3NH3-N (mg/L)(Feb,May,Aug,Nov) <0.08 <0.08 <0.08 <0.08 <0.08Total-P (mg/L)(Feb,May,Aug,Nov) <0.02NO3+NO2-N (mg/L) 5.1 1.7 32.8 55.2 52.9TDS (mg/L) 339 554 1153 973 1174

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

16-Feb-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2MW6 MW10MW13 Drinking Water Standard

`

March 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 22-Mar-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1055.42 1083.21Temperature, C 13.4 14.2Temperature, F 56.1 57.6pH (s.u.) 7.2 7.4TKN (mg/L) <0.5 4.0NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov) <0.08

NO3+NO2-N (mg/L) 14.5 6.3

TDS (mg/L) 681 565

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

March 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 22-Mar-16

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1109.06 1074.04 1056.06Temperature, C 15.6 14.2 14.6Temperature, F 60.1 57.6 58.3pH 7.7 7.5 7.5TKN (mg/L) <0.5 1.1 1.4NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 0.6 17.5 41.6TDS (mg/L) 527 616 572

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

March 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1132.30 1122.98 1119.57 1045.02 1081.46Temperature, C 14.5 18.8 14.9 14.1 13.9Temperature, F 58.1 65.8 58.8 57.4 57.0pH 7.3 7.2 6.6 7.4 7.3TKN (mg/L) 1.5 <0.5 2.7 1.1 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.1 1.8 32.8 62.6 54.7TDS (mg/L) 350 539 1157 1061 1198

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

22-Mar-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor Wells MW1 MW2MW6 MW10MW13 Drinking Water Standard

`

April 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 26-Apr-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1043.80 1082.78Temperature, C 13.8 14.7Temperature, F 56.8 58.5pH (s.u.) 7.5 7.5TKN (mg/L) <0.5 0.9NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 12.8 5.9

TDS (mg/L) 668 560

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

April 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 26-Apr-16

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.88 1061.72 1050.78Temperature, C 16.2 15.5 15.1Temperature, F 61.2 59.9 59.2pH 7.7 7.6 7.6TKN (mg/L) 0.8 0.7 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 0.4 17.0 39.7TDS (mg/L) 535 794 607

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

April 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1131.51 1115.57 1120.02 1044.26 1069.26Temperature, C 15.5 19.7 15.3 14.1 14.0Temperature, F 59.9 67.5 59.5 57.4 57.2pH 7.4 7.4 6.5 7.4 7.0TKN (mg/L) <0.5 0.8 0.6 <0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.0 2.0 33.0 73.5 52.5TDS (mg/L) 360 541 1211 1513 1389

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

26-Apr-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor Wells MW1 MW2MW6 MW10MW13 Drinking Water Standard

`

May 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 17-May-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1039.95 1082.33Temperature, C N/S 15.4Temperature, F 59.7pH (s.u.) 7.0TKN (mg/L) 2.5NH3-N (mg/L)(Feb,May,Aug,Nov) 0.10Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 6.0

TDS (mg/L) 553

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

May 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 17-May-16

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.56 1060.50 1049.36Temperature, C 16.7 N/S 17.6Temperature, F 62.1 63.7pH 8.1 7.9TKN (mg/L) 0.6 0.9NH3-N (mg/L)(Feb,May,Aug,Nov) <0.1 0.10NO3+NO2-N (mg/L) 0.6 30.7TDS (mg/L) 528 437

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

May 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1131.05 DRY 1120.95 1043.95 1066.11Temperature, C 15.7 15.4 14.8 N/STemperature, F 60.3 59.7 58.6pH 7.5 6.8 7.7TKN (mg/L) 1.1 1.6 1.9NH3-N (mg/L)(Feb,May,Aug,Nov) <0.1 0.10 0.10Total-P (mg/L)(Feb,May,Aug,Nov) <0.01NO3+NO2-N (mg/L) 5.0 33.7 75.9TDS (mg/L) 368 1200 553

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

17-May-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2MW6 MW10MW13 Drinking Water Standard

`

June 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 22-Jun-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * DRY 1081.90Temperature, C N/S 15.0Temperature, F 59.0pH (s.u.) 7.8TKN (mg/L) <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.8

TDS (mg/L) 550

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

June 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.19 1060.56 1048.15Temperature, C 16.5 N/S 18.4Temperature, F 61.7 65.1pH 8.0 8.2TKN (mg/L) <0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 0.4 29.5TDS (mg/L) 528 438

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

22-Jun-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

June 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1130.55 DRY 1121.38 1043.62 1066.11Temperature, C 15.6 15.4 14.8 N/STemperature, F 60.1 59.7 58.6pH 7.7 7.0 7.8TKN (mg/L) <0.5 <0.5 2.4NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.3 35.0 76.7TDS (mg/L) 386 1200 1519

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

22-Jun-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2MW6 MW10MW13 Drinking Water Standard

`

July 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 12-Jul-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1039.51 1081.87Temperature, C N/S 15.7Temperature, F 60.3pH (s.u.) 7.7TKN (mg/L) 2.2NH3-N (mg/L)(Feb,May,Aug,Nov) 0.10Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 6.0

TDS (mg/L) 555

ANNUALLYCALCIUM (mg/L) 108.0MAGNESIUM (mg/L) 40.7SODIUM (mg/L) 32.9POTASSIUM (mg/L) 5.3CHLORIDE (mg/L) 15.3SULFATE-S (mg/L) 18.3ALKALINITY (mg/L CaCO3) 378COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

July 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1107.84 1060.60 1047.96Temperature, C 16.7 N/S 17.7Temperature, F 62.1 63.9pH 8.0 7.9TKN (mg/L) 5.3 2.0NH3-N (mg/L)(Feb,May,Aug,Nov) <0.1 <0.1NO3+NO2-N (mg/L) 0.5 29.6TDS (mg/L) 551 487

ANNUALLY (July)CALCIUM (mg/L) 42.0 50.1MAGNESIUM (mg/L) 17.9 39.3SODIUM (mg/L) 113 18.2POTASSIUM (mg/L) 5.9 4.0CHLORIDE (mg/L) 73.6 28.2SULFATE-S (mg/L) 21.8 9.4ALKALINITY (mg/L CaCO3) 260 118COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

12-Jul-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

July 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1130.77 DRY 1122.50 1042.73 1066.02Temperature, C 15.6 15.2 14.9 N/STemperature, F 60.1 59.4 58.8pH 7.7 7.0 7.7TKN (mg/L) 2.9 2.7 1.0NH3-N (mg/L)(Feb,May,Aug,Nov) <0.1 <0.1 <0.1Total-P (mg/L)(Feb,May,Aug,Nov) <0.01NO3+NO2-N (mg/L) 5.7 35.7 77.0TDS (mg/L) 411 1217 1427

ANNUALLY (July)CALCIUM (mg/L) 78.9 177 217MAGNESIUM (mg/L) 24.6 68.9 81.4SODIUM (mg/L) 20.0 135 59.7POTASSIUM (mg/L) 6.0 8.1 9.5CHLORIDE (mg/L) 5.4 164 206 SO4-S (mg/L) 11.7 59.9 134.0ALKALINITY (mg/L CaCO3) 260 462 158COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

12-Jul-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2MW6 MW10MW13 Drinking Water Standard

`

August 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 3-Aug-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1039.85 1081.58Temperature, C N/S 15.1Temperature, F 59.2pH (s.u.) 7.7TKN (mg/L) <0.5NH3-N (mg/L)(Feb,May,Aug,Nov) 0.10Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.7

TDS (mg/L) 520

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

August 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1107.49 1060.62 1047.67Temperature, C 16.7 N/S 18.9Temperature, F 62.1 66.0pH 8.0 7.9TKN (mg/L) <0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov) <0.1 <0.1NO3+NO2-N (mg/L) 0.8 28.5TDS (mg/L) 529 429

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

3-Aug-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

August 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1131.09 1111.64 1123.29 1041.48 1066.01Temperature, C 15.5 N/S 15.3 14.9 N/STemperature, F 59.9 59.5 58.8pH 7.7 7.0 7.7TKN (mg/L) <0.5 <0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov) <0.1 <0.1 <0.1Total-P (mg/L)(Feb,May,Aug,Nov) <0.01NO3+NO2-N (mg/L) 5.7 34.3 77.9TDS (mg/L) 400 1161 1348

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

3-Aug-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2

MW6 MW10

MW13 Drinking Water Standard

`

September 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 13-Sep-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1039.42 1081.61Temperature, C N/S 14.9Temperature, F 58.8pH (s.u.) 7.7TKN (mg/L) <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.5

TDS (mg/L) 545

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

September 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1107.06 1060.55 1047.50Temperature, C 16.4 N/S 15.8Temperature, F 61.5 60.4pH 8.0 8.1TKN (mg/L) <0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 1.4 27.6TDS (mg/L) 545 434

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

13-Sep-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

September 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1131.78 1112.46 1122.71 1038.97 1065.98Temperature, C 15.3 N/S 15.2 14.7 N/STemperature, F 59.5 59.4 58.5pH 7.6 7.0 7.8TKN (mg/L) <0.5 0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.7 29.7 41.9TDS (mg/L) 408 1145 740

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

13-Sep-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2

MW6 MW10

MW13 Drinking Water Standard

`

October 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 17-Oct-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1039.44 1082.29Temperature, C N/S 14.3Temperature, F 57.7pH (s.u.) 7.7TKN (mg/L) <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.6

TDS (mg/L) 549

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

October 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1107.57 1060.44 1048.03Temperature, C 16.0 N/S 14.7Temperature, F 60.8 58.5pH 8.0 8.1TKN (mg/L) 0.7 1.2NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 1.4 26.7TDS (mg/L) 624 513

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

17-Oct-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

October 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1132.59 1119.70 1122.90 1039.87 1070.54Temperature, C 15.2 19.7 14.9 14.4 13.9Temperature, F 59.4 67.5 58.8 57.9 57.0pH 7.6 7.6 7.0 7.9 7.7TKN (mg/L) 2.0 0.9 1.9 1.1 0.8NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 5.8 2.3 24.8 32.6 50.1TDS (mg/L) 421 566 1122 734 1488

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

17-Oct-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2

MW6 MW10

MW13 Drinking Water Standard

`

November 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 21-Nov-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1049.27 1083.01Temperature, C 13.3 14.2Temperature, F 55.9 57.6pH (s.u.) 7.6 7.7TKN (mg/L) 0.6 0.9NH3-N (mg/L)(Feb,May,Aug,Nov) 0.1 0.10Total-P (mg/L)(Feb,May,Aug,Nov) <0.01

NO3+NO2-N (mg/L) 20.6 5.8

TDS (mg/L) 750 550

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

November 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.41 1070.21 1050.91Temperature, C 15.9 14.1 14.1Temperature, F 60.6 57.4 57.4pH 8.0 7.9 8.0TKN (mg/L) 1.1 <0.5 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov) 0.10 0.1 0.10NO3+NO2-N (mg/L) 1.4 19.4 28.2TDS (mg/L) 542 767 446

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

21-Nov-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

November 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1132.92 1124.98 1120.92 1041.12 1079.55Temperature, C 14.8 18.9 14.8 14.2 13.6Temperature, F 58.6 66.0 58.6 57.6 56.5pH 7.7 7.7 7.0 7.9 7.7TKN (mg/L) <0.5 <0.5 1.1 0.6 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov) 0.10 0.10 0.10 0.10 0.1Total-P (mg/L)(Feb,May,Aug,Nov) <0.01NO3+NO2-N (mg/L) 6.3 2.3 22.1 42.0 55.8TDS (mg/L) 418 575 1102 790 1360

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

21-Nov-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2

MW6 MW10

MW13 Drinking Water Standard

`

December 2016FIGURE 6A

NW SECTION MONITORING WELLSMONTHLY SAMPLE DATE: 14-Dec-16

PARAMETERS MW11 MW12WATER ELEV.(ft) * 1053.05 1083.26Temperature, C 12.6 13.0Temperature, F 54.7 55.4pH (s.u.) 7.6 7.8TKN (mg/L) 1.4 3.6NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 22.5 5.9

TDS (mg/L) 747 573

ANNUALLYCALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

N/A - no access due to growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

NW Monitor Wells MW11 MW12 Drinking Water Standard

December 2016FIGURE 6B

SE SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW3 MW8 MW9WATER ELEV.(ft) * 1108.86 1072.92 1054.11Temperature, C 14.5 13.2 13.7Temperature, F 58.1 55.8 56.7pH 8.1 8.0 8.0TKN (mg/L) 0.8 1.1 <0.5NH3-N (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 1.1 19.6 34.8TDS (mg/L) 541 604 462

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L)SULFATE-S (mg/L)ALKALINITY (mg/L CaCO3)COMMENTS: N/S - insufficient water depth to collect sample.

#N/A access to well blocked by growing crop

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

14-Dec-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

SE Monitor Wells MW3 MW8 MW9 Drinking Water Standard

December 2016FIGURE 6C

CENTER SECTION MONITORING WELLSMONTHLY SAMPLE DATE:

PARAMETERS MW1 MW2 MW6 MW10 MW13WATER ELEV.(ft) * 1131.78 1121.84 1120.59 1042.73 1080.68Temperature, C 14.1 17.6 14.3 13.0 12.8Temperature, F 57.4 63.7 57.7 55.4 55.0pH 7.7 7.7 7.1 7.9 7.7TKN (mg/L) 1.2 <0.5 1.7 0.9 2.7NH3-N (mg/L)(Feb,May,Aug,Nov)

Total-P (mg/L)(Feb,May,Aug,Nov)

NO3+NO2-N (mg/L) 6.3 2.4 21.6 59.4 58.5TDS (mg/L) 414 569 1073 902 1190

ANNUALLY (July)CALCIUM (mg/L)MAGNESIUM (mg/L)SODIUM (mg/L)POTASSIUM (mg/L)CHLORIDE (mg/L) SO4-S (mg/L)ALKALINITY (mg/L CaCO3)

COMMENTS: N/S - insufficient water depth to collect sample.

BASIC AMERICAN FOODSMOSES LAKE WASHINGTON

LAND TREATMENT MONITORING WELL ANALYSES

14-Dec-16

0

20

40

60

80

100

NIT

RA

TE

(m

g/L

)

Center Monitor WellsMW1 MW2

MW6 MW10

MW13 Drinking Water Standard

`

Appendix B: Irrigation Water Testing Summary (once per permit cycle)

Sample Date: 17-Jul-12

TDS, mg/L EC, uS pH, s.u. Nitrate-N, mg/LBAF 1 650 956 7.7 5.5BAF 2 760 1002 7.9 14.4BAF 3 379 547 7.4 6.8

BAF Plant N Well * 327 439 8.9 0.1Cox 1 579 740 8.0 10.7Cox 2 548 734 8.1 15.6

Cox 3A & 3B 491 682 8.0 16.6Cox 4 826 1004 8.0 19.5Cox 5 899 1143 8.1 28.0Cox 6 895 1110 7.9 41.0Cox 7 740 988 8.0 37.7

Cox 8 & 8A 781 1025 7.9 44.2Cox 9 750 1051 8.1 36.7Cox 10 820 1098 8.1 40.0

Cox 11 & 11A 598 817 8.1 22.6

Cox 12 & 13 731 1012 7.8 25.1

Cox 14 753 972 8.1 21.7Cox 15 353 540 8.3 4

AVERAGE 660 881 8.0 21.7

* Nitrate-N was below detection limit of 0.1 mg/L; 0.1 mg/L used for calculations purposes

APPENDIX C

CROP HARVEST DATA

CROP HARVEST SUMMARY - 2015

FIELD CROP CUT

WET YIELD, t/ac

TOTAL-N,

mg/kg

TOTAL-P,

mg/kgTOTAL-K,

% ASH, %

DRY MATTER,

%

IC-2 ALFALFA 1 4.00 30,080 3,200 2.22% 12.2% 93.7%2 2.00 33,120 3,800 2.86% 12.9% 95.7%3 1.80 34,400 3,500 2.68% 12.2% 93.6%

4# 0.79 33,040 3,350 2.49% 14.9% 94.6%5 0.41 31,680 3,200 2.30% 17.5% 95.5%

WEIGHTED AVERAGE 9.00 31,953 3,407 2.48% 12.8% 94.3%IC-4 BEANS 1 2.15 38,560 5,300 1.65% 4.2% 94.7%

BEAN HAY 1 0.9 8,640 900 2.29% 9.7% 93.9%WEIGHTED AVERAGE 3.05 29,731 4,002 1.84% 5.8% 94.5%

IC-12 TIMOTHY 1 4 18,720 2,600 2.39% 8.1% 95.0%2 2 16,000 2,000 2.94% 7.7% 94.2%

WEIGHTED AVERAGE 6 17,795 2,396 2.58% 8.0% 94.7%IC-13 ALFALFA 1 4.00 31,680 3,300 2.57% 13.9% 93.4%

2 2.00 32,640 3,100 3.01% 13.9% 94.0%3 1.50 33,120 3,100 3.18% 14.3% 93.7%4 1.00 30,400 2,900 3.07% 16.5% 94.5%

WEIGHTED AVERAGE 8.50 32,009 3,171 2.84% 14.3% 93.7%IC-16 ONION 1 0.00 10,080 2,200 1.25% 3.5% 89.7%IC-18 TIMOTHY 1 3.50 18,560 2,100 1.99% 6.3% 96.8%

BEANS 2 0.85 38,600 5,300 1.65% 4.3% 94.7%WEIGHTED AVERAGE 4.35 22,476 2,725 1.92% 5.9% 96.4%

IC-19 ALFALFA 1 3.00 30,400 3,000 3.06% 12.8% 94.9%2 2.00 36,160 4,000 4.30% 13.2% 94.7%3 1.65 33,600 3,600 3.90% 13.2% 94.0%4 0.85 32,000 3,400 3.24% 16.3% 91.1%

WEIGHTED AVERAGE 7.50 32,821 3,444 3.60% 13.4% 94.2%

# 4th cutting w as sold and shipped before a sample could be collected; average of previous and subsequent harvest used.

APPENDIX D

MISCELLANEOUS SOIL AND PLANT TEST DATA

NONE TO REPORT

APPENDIX E

FIELD LOADING DATA &

NITROGEN LOSS TECHNICAL NOTE

MONTHLY FIELD LOADING SUMMARY JANUARY 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-18 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-17 8.31 0.00 561 201 11,503 22,313 4,409 8,731 0.0 2.4 2.4 4 91

IC-16 4.78 0.00 323 116 6,614 12,830 2,535 5,021 0.0 1.4 1.4 3 52

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 5.22 0.00 353 126 126 14,026 7,231 2,772 0.0 1.5 1.5 3 56

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 14.18 0.00 958 19,634 19,634 38,085 7,526 14,903 0.0 4.0 4.0 7 151

IC-10 0.97 0.00 65 23 23 2,591 1,336 813 0.0 0.3 0.3 1 10

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-14 2.81 0.00 190 68 68 7,554 3,894 1,493 0.0 0.8 0.8 1 30

IC-15 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY FEBRUARY 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-18 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-17 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 91

IC-16 8.49 0.00 2,940 758 46,537 41,083 4,507 8,925 0.0 2.5 2.5 26 420

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 7.75 0.00 2,683 692 692 37,493 42,471 4,113 0.0 2.2 2.2 21 327

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 11.08 0.00 3,836 989 989 53,616 60,733 6,172 0.0 3.1 3.1 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 6.61 0.00 2,288 36,224 36,224 31,979 3,508 6,947 0.0 1.9 1.9 25 430

IC-10 1.39 0.00 480 124 124 6,709 7,600 736 0.0 0.4 0.4 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 4.08 0.00 1,410 364 22,328 19,712 2,162 4,282 0.0 1.2 1.2 11 172

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 4.64 0.00 1,604 414 414 22,420 25,397 2,460 0.0 1.3 1.3 12 195

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY MARCH 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 4.44 1.14 1,626 437 21,108 19,442 2,403 4,740 0.6 2.3 2.9 23 293

IC-18 0.00 10.50 0 0 0 0 0 0 3.2 0.0 3.2 0 0

IC-17 0.00 5.66 0 0 0 0 0 0 1.6 0.0 1.6 4 91

IC-16 3.67 4.22 1,345 362 17,468 16,089 1,989 3,923 1.2 1.1 2.3 36 558

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 9.20 0.00 3,370 906 906 40,300 43,754 5,382 0.0 2.6 2.6 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 8.72 0.00 3,193 858 858 38,181 41,453 4,719 0.0 2.5 2.5 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 10.61 0.00 3,884 1,044 50,433 46,452 5,741 11,325 0.0 3.0 3.0 41 560

IC-13 2.66 0.00 973 261 261 11,634 12,631 1,438 0.0 1.5 1.5 15 194

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 12 195

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY APRIL 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 8.79 5.50 2,528 403 38,397 35,100 4,755 9,379 2.8 4.5 7.3 58 825

IC-18 3.41 12.62 982 156 14,909 13,628 1,846 3,642 3.9 1.0 4.9 8 125

IC-17 0.00 40.94 0 0 0 0 0 0 11.9 0.0 11.9 4 91

IC-16 11.39 11.13 3,278 523 49,784 45,509 6,165 12,161 3.2 3.3 6.6 62 952

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 3.86 0.00 1,110 177 16,864 15,416 2,088 4,120 0.0 1.1 1.1 49 689

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 15 194

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 4.03 0.00 1,160 185 185 16,099 17,612 2,181 0.0 1.1 1.1 21 331

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY MAY 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 5.59 11.24 3,325 1,054 53,162 43,229 3,026 5,969 5.7 2.9 8.6 104 1,563

IC-18 10.39 19.53 6,179 1,958 98,788 80,330 6,011 11,092 6.0 3.2 9.2 60 950

IC-17 9.23 24.13 5,489 1,536 87,768 71,370 4,996 9,855 7.0 2.7 9.7 48 782

IC-16 2.84 30.02 1,690 536 27,018 21,970 1,538 3,034 8.7 0.8 9.6 76 1,165

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 4.09 0.00 2,429 770 38,839 31,582 2,211 4,361 0.0 1.2 1.2 68 988

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 15 194

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 11.66 0.00 6,932 2,197 2,197 90,122 110,830 6,309 0.0 3.3 3.3 75 1,183

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY JUNE 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 8.98 11.88 3,814 1,131 49,453 40,386 5,300 9,591 6.1 4.6 10.7 157 2,249

IC-18 7.25 14.36 3,076 912 39,882 32,570 3,921 7,735 4.4 2.2 6.6 86 1,283

IC-17 0.00 25.99 0 0 0 0 0 0 7.5 0.0 7.5 48 782

IC-16 24.81 13.32 10,531 3,124 136,547 111,513 13,425 26,482 3.9 7.2 11.1 159 2,245

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 68 988

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 15 194

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 0.85 0.00 363 108 108 3,839 4,701 462 0.0 0.2 0.2 77 1,220

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY JULY 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 19.53 17.00 10,181 2,834 111,744 93,338 11,010 20,850 8.7 10.0 18.7 298 3,798

IC-18 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 86 1,283

IC-17 12.96 28.94 6,032 1,881 66,211 55,304 7,015 13,838 8.4 3.8 12.2 95 1,304

IC-16 18.63 26.96 8,922 2,703 97,928 81,797 10,080 19,884 7.8 5.4 13.3 229 3,019

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 2.30 0.00 1,200 334 13,170 11,001 1,246 2,457 0.0 0.7 0.7 77 1,089

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 15 194

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 77 1,220

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY AUGUST 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 7.05 16.53 312 59 11,637 19,278 3,814 7,523 8.4 3.6 12.0 302 3,960

IC-18 14.37 1.08 635 120 23,736 39,321 7,779 15,345 0.3 4.4 4.8 91 1,481

IC-17 7.75 25.37 343 65 12,801 21,205 4,195 8,275 7.4 2.2 9.6 98 1,405

IC-16 8.63 32.29 382 72 14,255 23,614 5,174 9,215 9.4 2.5 11.9 232 3,132

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 2.24 0.00 99 19 3,702 6,133 1,213 2,393 0.0 0.6 0.6 78 1,118

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 15 194

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 1 30

IC-15 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 77 1,220

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY SEPTEMBER 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 9.85 3.59 4,149 1,635 48,552 44,609 5,953 8,790 1.8 5.0 6.9 360 4,633

IC-18 0.00 25.81 0 0 0 0 0 0 7.9 0.0 7.9 91 1,481

IC-17 14.94 3.23 6,293 2,480 73,646 67,664 8,086 13,333 0.9 4.3 5.3 148 1,985

IC-16 0.00 2.63 0 0 0 0 0 0 0.8 0.0 0.8 232 3,132

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 47 663

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 78 1,118

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 15 194

IC-14 5.61 0.00 2,362 931 931 25,397 27,641 3,035 0.0 1.6 1.6 20 243

IC-15 10.92 0.00 4,598 1,812 1,812 49,439 53,809 5,908 0.0 3.1 3.1 113 1,633

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY OCTOBER 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 2.14 0.00 739 253 10,474 9,332 1,158 1,909 0.0 1.1 1.1 370 4,778

IC-18 0.98 0.95 338 116 4,797 4,274 530 874 0.3 0.3 0.6 94 1,521

IC-17 6.86 0.00 2,369 813 33,590 29,928 3,713 6,123 0.0 2.0 2.0 166 2,250

IC-16 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 232 3,132

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 10.76 0.00 3,713 1,274 1,274 46,911 52,652 5,820 0.0 3.0 3.0 75 1,068

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 430

IC-10 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 4 69

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 2.01 0.00 695 238 9,855 8,780 1,089 1,796 0.0 0.6 0.6 83 1,194

IC-13 2.34 0.00 809 277 277 10,220 11,470 1,268 0.0 1.3 1.3 27 371

IC-14 8.93 0.00 3,085 1,058 1,058 38,968 43,737 5,217 0.0 2.5 2.5 43 579

IC-15 1.43 0.00 494 169 169 6,242 7,006 774 0.0 0.4 0.4 117 1,687

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY NOVEMBER 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 5.60 0.00 1,715 486 22,056 22,897 3,032 5,000 0.0 2.9 2.9 394 5,084

IC-18 5.11 0.00 1,565 443 20,125 20,893 2,767 4,562 0.0 1.6 1.6 107 1,690

IC-17 11.22 0.00 3,434 973 44,170 45,855 6,486 10,013 0.0 3.3 3.3 193 2,598

IC-16 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 232 3,132

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 75 1,068

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 7.15 0.00 2,189 28,154 28,154 29,227 3,871 6,382 0.0 2.0 2.0 42 646

IC-10 2.36 0.00 723 205 205 9,648 9,294 1,278 0.0 0.7 0.7 10 140

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 83 1,194

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 27 371

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 43 579

IC-15 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 117 1,687

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

MONTHLY FIELD LOADING SUMMARY DECEMBER 2016

TOTAL WATER LOAD

PROC. FRESH

WATER IRRIG. TKN NH3-N BOD FDS Na K FRESH PROC. TOTAL TKN BOD

FIELD MG MG lb lb lb lb lb lb in/ac in/ac in/ac lb/ac lb/ac

IC-19 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 394 5,084

IC-18 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 107 1,690

IC-17 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 193 2,598

IC-16 3.63 0.00 1,641 472 22,887 18,074 1,964 3,239 0.0 1.1 1.1 245 3,313

IC-1 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-1a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-2 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 75 1,068

IC-3A 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-3B 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-4 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-5 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 32 523

IC-6 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-7 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 25 319

IC-8 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-8a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-9 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 42 646

IC-10 16.22 0.00 7,331 2,110 2,110 80,749 102,255 9,171 0.0 4.6 4.6 66 927

IC-11 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-11a 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 0 0

IC-12 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 83 1,194

IC-13 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 27 371

IC-14 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 43 579

IC-15 0.00 0.00 0 0 0 0 0 0 0.0 0.0 0.0 117 1,687

prepared by SOILTEST FARM CONSULTANTS, INC Moses Lake, WA

BASIC AMERICAN FOODS - LAND TREATMENT FACILITY MOSES LAKE, WA

YTDHYDRAULIC

PER ACRE LOADINGS

CALCULATED VALUES

MONTHLY LOADING TO EACH FIELD

IN PROCESS WATER

Technical Note: Nitrogen Losses in Land Application of Wastewater Dan Nelson, Ph.D., CPSS Soiltest Farm Consultants, Inc. July 2015 Nitrogen transformations in field soil environments are quite complex. Transformation pathways and rates are affected by soil type, temperature, moisture, fertilizer application (both form and amount), organic amendment addition (both form and amount), crop, chemical applications, microbial populations and historic treatments and management of the field. The various nitrogen transformations can be measured for specific conditions in the laboratory or small field plots, but can only be estimated for whole field or farm conditions. The historic approach soil scientists have taken has been to measure nitrogen use efficiency. Nitrogen removal by the crop is compared with the nitrogen added to the field after correction for a control receiving no additional nitrogen. The balance is also corrected for changes in soil nitrogen throughout the profile before and after the study. All nitrogen unaccounted for is labeled gaseous loss which consists of varying ratios of ammonia volatilization and denitrification, depending on circumstances. As far as the balances used in the BAF annual report, it really does not matter whether the nitrogen loss is due to ammonia volatilization or denitrification. On pages 11 and 12 of the ICMP, I clearly state the conditions in the field under which the wastewater is applied and their likely impact of volatile losses and nitrogen use efficiency. I have included a few references for the comfort of Ecology below. Nitrogen use efficiency Crops never recover the total amount of nitrogen applied, regardless of the form in which the nitrogen is applied or if the absolute best management practice are employed. Even under closely controlled laboratory conditions, 85 to 90% use efficiency is the best that can be attained. On field scale application, with best management practices, a value of 60% nitrogen use efficiency is about all that can be expected for most row crops while perennial forage crops might be expected to reach 75% nitrogen use efficiency (Henry, C., D. Sullivan, R. Rynk, K. Dorsey and C. Cogger. April 1999. Managing Nitrogen from Biosolids. Washington Department of Ecology and Northwest Biosolids Management Association). The State of Idaho Department of Environmental Quality accepts the nitrogen use efficiency rates in Henry, et.al 1999 as does the NRCS in Technical Note 6, released in 2007. Ammonia volatilization NRCS Nutrient Management Technical Note No. 6, September 2007, contains the following, which is a restatement of an article by Dr. Stevenson (Stevenson, FJ, 1986. Cycles of soil: Carbon, nitrogen, phosphorus, sulfur, micronutrients. John Wiley & Sons, NY). Ammonia volatilization Ammonium ions (NH4+) in the soil solution exist in

equilibrium with ammonia (NH3) in the soil solution. There is a tendency for the equilibrium to favor conversion to ammonia because solution NH3 is subject to gaseous losses to the atmosphere. Soil pH and the concentration of ammonium (NH4+) in the soil solution are important factors affecting amount of ammonia (NH3) volatilized. As soil pH increases, the fraction of soil-solution ammonium and NH3 increases by an order of magnitude for every unit of pH above 6.0. The following summarizes favorable conditions for NH3 volatilization: • Prominent on calcareous soils, especially as soil pH exceeds 7; • Can be appreciable for neutral or alkaline soils as they dry out; • Increases with temperature and wind speed; • Greater in soils of low CEC, such as sands where NH4+ adsorption is low; • High when high-N organic wastes, such as manure, are applied to the soil surface and permitted to decompose; • High from urea when it is applied to grass or pasture, as a result of hydrolysis of the urea to NH3 by urease enzyme; • Losses are decreased by growing plants. Volatilization losses can be as high as 100% of the ammonium on or near the soil surface if one or more of the above conditions exist. Approximately 1/3 to ½ of the BAF wastewater TKN is in the ammonia form. The surface soil pH of the BAF application fields runs from 7.5 to 8.5. The soils have sandy texture with low CEC. The temperature is frequently hot during the summer and windy conditions are common to the site. The conditions for ammonia volatilization to be significant are present. Denitrification During the mineralization of ammonia to nitrate, there is a step in which nitrous oxide can be lost to the atmosphere. However, the primary mode of denitrification is during times of oxygen deficit in the soil environment when soluble carbon and nitrate are both present. NRCS Nutrient Management Technical note 6 discusses denitrification as well. Denitrification is the route for most losses of gaseous N compounds to the atmosphere. The potential for denitrification is increased as oxygen levels in the soil decrease. Nitrate, a desirable nutrient for plants, is reduced first to NO2, then to NO, next to N2O, and finally to N2. In addition to limited oxygen, denitrification needs a carbon source of energy, effective microbes, and oxides of N. Denitrification losses can be as high as 10 pounds of nitrogen per acre per day when conditions are optimum. A PowerPoint presentation was made at the American Society of Agricultural and Biological Engineers Annual International Meeting in 2009 at Reno, Nevada titled “Fate of BOD and Nitrogen in Land Application of Food Processing Wastewater” by Mitchell Johns, CSU Chico, Robert Beggs, Brown and Caldwell and Ron Crites,

Brown and Caldwell. They utilized PVC soil columns buried in the field and treated with varying rates of tomato cannery wastewater. The soil involved was a clay loam. Gaseous nitrogen losses ranged from 50 to nearly 65% in these studies. The BAF land application soils are loamy sand to sandy loam in texture and thus are less prone to anoxia compared to the clay loam soils in the study. However, particularly on the perennial hay fields where bits of hay are left after each harvest in addition to irrigation with potato wastewater, it is common to find an organic crust or slime on the surface of the soil which could reduce the exchange of atmospheric oxygen enough to result in localized, ephemeral reducing conditions within the soil and thereby enhance denitrification.

APPENDIX F

DOE SOIL TEST DATA

APPENDIX G

PIVOT INSPECTION LOGS

W/E 1-2-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / clear haeds on pivot #10having problems unplugging sprinkler heads due to cold water coming from plant getting low pressure

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok tried to unplug some springkler heads / cold water coming from plant

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok / broken build up ice on each tower and sprinklers heads fuel up LTS truck

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workadd oil to goyne pump / clean east side mud pit broke n build up ice pivot #10 washed frontend loader

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.did a call in everthing checked out ok / checked on goyne pump ok

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Holiday call in Chopped ice off #10

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.#10 Fell downPlant water to #14 Drained #10Called in John and Paul to help thaw and get #14 started

W/E 1-9-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestswitched pivot #14 to pivot #17 waste water / cleared sprinklers heads on pivot #17 drain water off pivot #14

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper work Ph 6.4pivot #17 looks good no ice builed up

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #17 ok / dropped soil test talke to HR about are shedule days

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #17Goyne pump lost prime restartedGot shop phone repairedTalked with Dodds about ADP

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #17Set up #9 with valves at the towers and closed the big gun valveWorked on correcting paperwork

W/E 1-16-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checon pivot #17 ok/ goyne pump ok clear heads on pivot #17

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok // clear sprinklre heads on pivot #14 replaced broken onespivot #14 ready go clear heads on pivot #17

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestwe were going to switch pivots from #17 to #9 / main line on pivot #9 needs wildedpivot #17 ok

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph6.9Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workswtiched pivots from #17 to pivot #9 on waste water /drain water out of pivot #17had eloy / john weld main line on pivot #9

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #9 ok / goyne pump ok

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #9 all others offWashed LTS truckWorked on tools and boltsWorked correcting paperwork

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #9 all others offHelped with #10We are leaking out the 712 mainline at #4 #5 #7 #14 I checked all the valves and didn’t find one open

W/E 1-23-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #9 waste water aquamatic valve is plugged up endgun is not working Iam goning to switch pivots and take off aquamatic valve fuel up LTS truck / checking valves on main line to 712 for leaks

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #9 ok / helped frank G at the plant per mike doddsI colsed waste valve going to cox in north meter pump house

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestswtiched pivots #9waste water to pivot #16 waste water drain pivot #9 took aguamatic valve off clear sprinkler heads on pivot #16opened drain valves to main line going to pivot #9.

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.9Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workPlant water on #16 all others offReplaced and reinstalled endgun on #9Cleared heads on #16Talked with Patsy about ADP

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.swtiched pivots from #16 to #9 waste water clear sprinklers heads on pivot #9 / drain waste water out of pivot #17

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #9 all others offUnplugged endgunUnplugged headsFixed paperwork for PatsyHelped Jesse with well #1

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #9 all others offUnplugged headsPut oil in Goyne pumpWashed LTS truck

W/E 1-30-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

clear heads on pivot #9 checked on goyne pump ok all other pivots off

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.add oil to goyne pump ok / cleared heads on pivot #9changed tire gearbox on pivot #5 / fuel up LTS truck

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestswtihed pivots #9 to pivot # 5 waste water / washed LTS truck for 2016 potato conference3; 05 checked on pivot #5 broke down / swithed back to pivot #16 waste water

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked pivot #16 ok / went to potato conference 2016

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #5 all others offUnplugged headsStarted working on pivot hour meters

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Meet with Nathan Scones and toro about world cup grassPlant water is on #5 all others offCaught up safety meetingsFinished pivot hour meter spreadsheet

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #5 all others offWorked correcting paperworkWashed LTS truckGot fuel in LTS truck

W/E 2-6-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #5 waste water ok / clear heads on it checked goyne pump ok / all other pivots are offworking on monthly work orders

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #5 ok / frank g called said needed help halling gravel to plantcleared heads on pivot #5

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on pivot 3 ok / checked on goyne ok removed number #1 well pump house by main pum,p house

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 7.3Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workswitched pivot #5 to pivot #10 waste waterdropped off soil test off

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #16 because it got all plugged upAll pits plugged up and backed up worked on it all dayGot surge pit going

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #9 all others offCleaned up mess at Goyne pump for yesterdayCleared all plugged heads on #9

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #9 all others offUnplugged heads on #9Washed LTS truckWorked on paperwork

W/E 2-13-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

Checked pivot #9, Unplugged sprinkler heads, Worked on drainage ditch at the plant,checked pivoy #9 at end of the day

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.clear sprinkler heads on pivot #9 / fuel up LTS truck

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestcleaned around pivot #18 removed pump house

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.2Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workcleaned mud pit washed front end loader clear heads on pivot #9

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.switched pivots pivot #9 to pivot #5 waste water checked pivot #5 looks good no plugged heads

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #5 all others offGot oil changed in LTS truckTalked to PUD about starting transformer at #18 energized Tuesday it will get doneStarted cleaning shopGot fuel in LTS truck

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #5 all others offchecked pivot #5 looks good no plugged heads worked cleaning shop and office

W/E 2-20-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on gonye pump ok / checked pivot #5 waste watercleared some plugged sprinklers heads / picked up Garbage from pump house

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #5 ok / gonye pump ok jesse came and picked up well one tin houseclear heads on pivot #5 / mud pit needs cleaned

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestpivot school all 8 hr

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 6.3Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workswitched pivot #5 to pivot #2 waste water cleared heads on pivot #2 / took some parts off the old well dropped them off at plant carl burton

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.fuel up LTS truck / went to pivot school

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #2 all others offCleared heads on #2Shut all drain valves on cox farmWorked on work ordersMoved #13 and #19 to the stops as/per Kurt

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 2-27-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on gonye pump ok / pivot #15 waste water cleared heads on it okhad paul herrera help me take frontend loader back to plant mud pits need cleaned / paul also needed to pickup some beans

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #15 ok / irrugation came and pulled out mud pump bad bearingfuel up LTS truck cleaned both mud pits put a sub pump to pump water out of pitwashed frontend loader locked out mud pump

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked pivot #15 ok switched pivot s#15 to pivot #12 wastewater cleared sprinkler heads on pivot #12

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on sub pump ok / went to safety meetingwent to my dental appointment fixed broken bolt on pivot #18 driveline

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #12 all okWent to Pasco for trade show

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water still on #12 okCleared heads on #12Worked on paperwork Helped Nathan at plant

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #2 all others offBought safety cones and labled and put in parking lotCleared heads on #2Got #7 ready to run as/per Kurt

W/E 3-5-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked everthing at plant ok / waste water on pivot #2opened all back flow proventors closed drain valvesclear heads on pvots #2 waste water / pivot #7 fresh water

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on sub pump still working / fuel up LTS truckclear heads on pivots #2 waste water / #7 fresh water worked on monthly work orders / washed LTS truck

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestworked monthly work orders / clear heads on pivot #2 waste water

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.0Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workswitched pivots #2waste water to #12 /clear heads on #12drapped off soil test

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok greased goyne oil pump switched pivots #12 waste water to pivot #2 cleared heads

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #2 all others offCleared heads on #2Cleaned out flow controllers on the last three spans on #10 and opened valves at the towersGot fuel in LTS truckTalked to Carl B. about new surge pit pump

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #2 all others offCleared heads on #2

W/E 3-12-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked sub pump at plant ok / checked pivot #12 clear headsper kurt swtiched to pivot #7 replaced two black drain pluggs swtiched waste water cleared heads on pivot #7

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on sub pump ok / washed LTS truck clear heads on pivot #7 / burned some weeds along fince by shop

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on sub ok / went johndeer pick up new riding law mowergot pivot #18 #17 ready to start up any time

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.7Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked sub ok / fuel LTS truckpicked up grabage around plant checked pivot #7 ok

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #7 ok / turn on water for soil test started filling up pond getting weeds out of pond started up pivot #18 with fresh water wells #1 #2 up pivots #18 fresh water / pivot #7 waste water

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #2 all others offCleared heads on #2Got fuel for PaulWorked on plumbing new toilet

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #2 all others offCleared heads on #2Started fresh water on #18 as/per Kurt running well #2 onlyFinished installing new toilet Bought new step ladders old ones were not safe

W/E 3-19-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on sub pump ok / cleared heads on pivot #2fuel up LTS truck

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #2 clear heads / heiped jeff grant with backflow valve testing shut pivot #18 fresh water off distrubtion pump #2 well #2 switched waste water to pivot #7 clear heads on pivot #7

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestdistrubtion pump mainline has broken 2' valve linking waterstarted draining pond eloy will come fix it when ponds out of water switched pivots #7 to pivot #12 waste water per kurt clear heads on #12 / helped jiff grant backflow testing

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.3Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on pivot #12 waste water ok / eloy / john came weld distrbution mainline well #1 ready to go

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #12 all others offGot fuel in LTS truckChanged gearbox on #12 restartedLearned to run #1 wellHelped john and eloy install flail mower on tractor

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #12 all others offWashed LTS truckSwitched endguns on #2 and #7Got #13 ready to run tomorrow

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #13 Fresh water on #19 all others offRepaired leak at center of #19Repaired end drain on #13Got water around D/S pond goingCalled sheriff about strange woman

W/E 3-26-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

restarted pivot #19 fresh water due to low pond / checked pivot #13 waste water ok clear heads on pivots #1A #2 # 13 #19 per kurt shut pivot #19 off / Tomrrow morning switch waste water to pivot #19

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.switched pivots on waste water #13 to #19 / switched back due to flat tire and broken drivline on pivot #19fuel LTs truck / replaced broken drivline changed flat tire on pivot #19 per kurt switch waste water to pivot #2

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestclear heads on pivot #2 waste water / pivot # 17 turn on with fresh water bad leak on last tower called kurt about leak ok kurt called shut pivot # 17 off / worked on 5110 tractor flail mower broken yoke cross / replaced broken parts with old flail we have hereswitched waste water to pivot #7 per kurt

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.1Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on pivot #7 ok waste water / put some wire fance around well #1 for safetycalled to plant broken 3/4' pipe leaking fresh water fix the leakswitched waste water from pivot #7 to pivot #16 clear heads

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #16 Fresh water is on #17 and #18 with #19 offCleared all plugged headsHelped Franky G with crew washing out ventsRepaired #17Repaired #16

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #16 Fresh water is on #17 and #18 with #19 offGot fuel in LTS truckShut off Fresh water mid dayRepalaced centher drive on #7Took tools out of truck because its going in for repairs

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 Fresh water on #17 and #18 with #16 offMet with M. Radder about drains and surge pitTook LTS truck to get looked atHelped Kurt with end gun on #14Cleared all plugged heads

W/E 4-2-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #19 plant water ok / clear heads on pivots #19#18#17kurts pivots clear heads on #5#6#15 / pivot #14 down broken bolt on drvieline / replaced drainplug on pivot #14

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #19 waste water down this morning / switched to pivot #13 had prolbems with endgun per kurt swtiched fersh water to pivot #16 clear heads / shut pivot #17 off / clear heads on #13jim clark call he need the parts truck back at plant take black jeep fuel up jeep changed broken driveline on pivot #19 / add air on one pivot tires low

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltest

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on pivot #12 waste ok / #16 #18 fresh water ok changed broken driveline on pivot #19 monthly safety meeting at plant / meeting with mike doddsback flashed end gun on pivot #13 / cleaned screen

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 fresh water to #17 with #16 and #18 off/Cleared all headsGot fuel and washed JeepPicked up LTS truckJesse did not make it today but first thing tomorrowMelodie came out to switch internet

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #16 Fresh water on #17 with #18 and #19 offUnplugged all heads Helped Carlos install surge pit pumpDid procard paperworkStarted cleaning up pit area

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #16 Fresh water on #17 and #18Cleared every plugged head on every pivot running on the farmReplaced four goose necks on #10

W/E 4-9-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

changed pivots speed to 90% on #16 #17 #18 per kurtclear heads on pivots#16#17 #18 #8 #12 #13 #14 put sprinkler hose back on pivot #12

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.came this morning distribution pump #2 tripped out / resorted pivots#18 #17 fresh water fuel up LTS truck / got gas for yards / grounds added oil east pump went to Jerry auto supply and order gas magun shock for LTS truck

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestdistribution pump #2 down on low water restarted pivots #17 #18 well#1 1000 / 1500 gl per min 35 hz to 40hzwork on frontend loader took old battery get checked no good / replaced it with new batteryper kurt shut pivot #18 off turned on pivot #19 with fresh water / clear heads on pivots #16 #17 #19

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.7Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workmeeting with mike dodds wrapped pivots #8 #8a #9 dropped soiltest

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #16Fresh water is on #17 and #18 with #19 downCleared all heads Bought auquamatic for #13Took Piece of mainline to lad/got fuel in LTS truck

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #16Fresh water is on #17 and #18 with #19 downCleared all heads Washed LTS truck/Shipped meterHad Lad irr made a mainline pipe for plant system and installed it

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 4-16-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on mud pit ok / checked oil on west goyne ok cleared out sprinklers heads on all fresh water pivots pivot #16 waste water keeping eye on mud pit at plant mixing fresh water per kurt

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump low on oil put some oil fuel up LTS truck / got 6'' mainline out of irrigation ditchpaul helped wrap pivots #16 #11a / clear heads on pivot #19 waste water

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked out goyne pump oil ok / helped paul handline Irrigation pump goingfix broken sprinkler heads by front lawn / went to Jerry Auto pick up gas charged shock for LTS truck picked up gray line valve for kurt at lad Irrigation / pivot #19 waste water adding some fresh water 40 % psi per kurt pivots #17 #18 fresh water wells #1 #2

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.5Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on goyne pump ok / per kurt shut pivots #17 #18 off / wells #1#2 offwaste water on pivot #19 / shut main water to fire line fix broken pvc pipeuse Irrigation water for goyne pump

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.unplugged sprinklers, started pivot #17, worked on sprinklers at the plant

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.unplugged sprinklers, checked pivots . Worked on sprinklers at the plant

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.unplugged sprinklers, checked pivots . Shut the irrigation pump off water in the motor

W/E 4-23-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / Irriogation pump at plant down water mix with oildid last week paper picked up extra drivelines /centerdrive / one grear box at plant

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked goyne pump low on oil add oil / clear heads on pivots #17 #16 fresh water switched waste water to pivot #18 / shut pivot #19 offIrrigation pump still down john u was off waiting to changes Electrical wires tooter Irrigation pump

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne ok / kurt needed 8' grayline valve for pivot #9 got at lad Irrigation switched fresh water back to pivot #17 clear heads on pivots #18 #8 #17 waste water on pivot #18

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork./Ph7.0Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workswitched pivots #18 waste water to pivot #17 / clear heads on pivot #19goyne low on oil add addsame oil

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #19 cleared headsFresh water is on #17 all others offWorked on paperwork sent Dan N. paperwork for last week and flowmeter chart for 2015Got billing info for top cut for well #1 houseUnplugged endgun on #19 and last two drops

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #15 cleared headsGot endgun working on #14Corrected paperwork for last week Big messHelped Paul with SS mainline and got some new gasketsStarted fresh water on #16

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #15 cleared heads/Changed water at plantGoyne low on oil added some oil/Did two safety observationsChanged wheel gearbox and driveline on #19Put oil in drippers on #1 and #2 wells/Surge pit pump was kicked out resetCleaned oil spill from back of LTS truck/Washed LTS truck

W/E 4-30-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok clear heads on pivot #15 waste water started mowing around pond

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump low on oil added oil / cleaned east side of mud pit washed front end loaderfuel up LTs truck / Got some Gas for yards and groundturn on sprinklers around pond / well #3 do to low pond fresh water on pivots #16 #17switched waste water to pivot #18 per kurt/ clear heads on pivots #18 #15 well #3 off

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok / mud pit full checked ouerload heater it had tripped out Restartedtold john u about mud pump tripping out he changed ouer load heater to higher RPMshut pivot #16 off fresh sent fresh to pivot #19 / shut pivot #18 waste off sent waste to pivot #12shut pivot #17 off fresh sent fresh to pivot #18 clear heads on pivots #18 #12 #19

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked goyne pump low on oil added oil / Replaced all 4 shocks on LTS truckmeeting with mike dodds pivots #17 #19 fresh water waste water on pivot #12wrapped pivot #10

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #12 cleared all headsFresh water on #17 and #19 with #16 and #18 offSwitched fresh water to #16 and shut down #19 as/per KurtSafety meeting/Meeting with Dodds Did procard paperwork and turned in

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #12 cleared all headsFresh water on #17 and #168with #16 and #19 off#16 broke down no powerGot John and Renee to work on it also Steve#16 still down/Got fuel in LTS truck

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #18 cleared heads Fresh water on #16 and #17 with #19 downWashed LTS truckJesse repaired #16 and it is now runningMoved water at plant/Worked on Pauls schedule

W/E 5-7-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / day off did saftey meeting on computer switched fresh water from pivot #17 to pivot #16 clear heads on pivot #19 fersh water pivot #18 waste water low pond turn on well#3

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump low on oil added / switched fresh water from pivot #16 to pivot #17showed pauls helper were to pull weeds turn on uderground sprinklers in front oiffice mowed around pond

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump low on oil added oil / clear heads on pivots #18 #19 waste water on pivot#18 fresh water pivots #17 #19 wells #1 #2 #3

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workPlant water to #15

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water still on #15Fresh water on #17 #18 and #19Cleared all headsGot fuel in LTS truckWorked on and had meeting about Pauls new schedule/Installed meter on #16

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water still on #15Cleared all headsWashed LTS truckWorked on water problem at plantWorked on Screens

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water still on #15Cleared all headsAdded oil to Goyne pumpWorked on ScreensWorked on computor problem

W/E 5-14-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

switched waste water to pivot #12 / checked on goyne pump low on oil added oil pond low shut pivot #18 filled pond up / mowed around pondrestarted pivot #18 #17 #19 fresh water pivot #15 waste water wells #1#2#3

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne ok / pond low shut pivot #19 filling up pondunplugged endgun on pivot #16 / john uhl worked on amiad fliters screen #2 going restarted pivot #19 / fuel up LTS truck finshed mowing around pondper kurt pivot #19 off at 4;30

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok / low pond psi 47% / dumped out oil out of old gearbox / center drives at pump house clear heads on pivot #12 #18

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.9Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on goyne ok / goyne pump leaking water packing needs tighten we tighten packing on the goyne pump / 8 :30 am goyne stoped working bad fusehelped paul start 510 tractor cross line to goyne pump

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 5-21-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / still on bypass filters distribution pump #2 tripped out restarted pump #2 back upclear heads on pivots #18 #16 wells #1#2#3 fresh water #17 #16 / #18 on waste

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.john uhl replacedhigh voltage fuse on goyne pump invitercleaned sweco screen switched waste watyer to pivot#16 from pivot #18picked up trialer tire from ok tire / installed on trialer

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestdumped sweco peel bin cleaned mud pit washed front end loadercalled john deer come check 5410 tractor

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph7.1Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper work

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.plant water on pivot #15 /#16 #18 fresh water replaced irrigation top / got fuel chaged oil Friday move water made hose bib

W/E 5-28-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

mowed around pond / switched pivot #15 wasteto pivot #17 pivot #18 off per kurt clear heads on pivot #15 kurt turn fresh water on #15

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.finished mowing around pond / turn on under ground sprinklersadded oil to goyne pump

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestsweco filter stopped working / john uhl checked its bad mortorchanged to by pass / started take sweco apart / switched waste water from povit #17 to pivot #18 fresh back on pivot #17

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph6.5Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workmeeting with mike dodds / finished working on sweco motor its on ordergot sample for soiltest from pivot #13 / fixed broken driveline of 5410 mower tractor

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 Fresh water on #16 all others offGot 6 new sprinklers for PaulGot fuel in LTS truckWorked on PaperworkTook hay samples to soil-test #13 and #19

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #17 Fresh water on #16-#18and #19Cleared all headsMet with Dodds and Kurt about #14 mainlineOrdered truck parts door and tailgate/and tires for pauls gatorMoved lines at plant

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 Fresh water is on #16 and#17 and #18 is offCleared headsRepaired mainline at plantPick up driveline for 5410Changed water at plant

W/E 6-4-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked goyne pump ok / swtiched pivot fresh water from #18 to #17 per kurt due to high winds clear haeds on pivot #17 / changed water at plant

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked goyne pump ok / fresh water on pivots #16 #17 / waste water on pivot #19 wells #1 #2 / clear heads on pivot #17 #19 started irrigation water at plant

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump low on oil added oil / distrbution pump #2 well #1 off due to pond low on water restarted pump#2 well #1 all pivots going added oil well#3 changed handlines at plant / seanding fresh water from pivot #14 valve at pivot #17 is open

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph6.6Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workRestarted ditribution pump # 2 / well #1 due to low water on pond got meter numbers to all of kurt pivots / got sample from pivot #17 for soil test dropped it offpivot #16 #17 #18 fresh water / pivot#19 waste water wells #1 #2 #3 going

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.pivot #16 #17 fresh water / pivot#19 waste water wells #1 #2 going Got new head and string for Pauls weed eaterMoved lines at plantUnplugged headsTalked to dan about #12 and #13 monitors

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.pivot #17 #18 fresh water / pivot#19 waste water wells #1 #2 going Unplugged headsPicked up new power washerGot fuel in LTS truckSet Paul up for weekend

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started sprinklers at the tree line at the plant, Checked pivots #17 & #18 fresh water #19 is waste water, Wells 1 & 2 running.got alph alpha samples, Switched the waste water from pivot #19 to #15, Frinished washing Dodd's office, guard shack and shedShut pivot #17 off

W/E 6-11-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

Switced waste water from pivot #15 to #19, Pivot's #16 and #18 running fresh water and pivot #19 is running waste water,all 3 wells are running

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / pivots #17 #19 off / pivot #18 on waste water pivot #16 fresh water / wells #1#2#3 going / Rest of fresh water is going to coxs pivotsKurt has two wells down / cleared heads on pivot #19 // switched waste water to pivot #19 from #18

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump low on oil added oil // came in waste water was on pivot #18 kurt swtiched pivots last night from #19switched waste water back to pivot #19 at 11/ pm // replaced door panel on LTS truck / picked up at bud clary changed handlines at plant / hepled eloy get 5410 tractor started for paul

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked goyne pump ok / meeting with mike dodds // fuelup LTS truck / Gas cans for yards groundwent to lad irrigation get luckring end plug for mainline // due to unground pipe going across street to tiangle are gets fix bad leak

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 Fresh water to #16 with #17 and #18 offGot parts to service gatorsPicked up plug from LaddWorked on getting set to pull goyne pumpChanged meter on #17

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #16 fresh water to #18 and #19Cleared heads unplugged endgun on #19Worked on getting set to pull goyne pumpWorked correcting paperworkMade water changes for Kurt on his fields

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #16 Fresh water on #18 and #19Cleared all heads Washed LTS truckMoved lines at plant and repairedBaby sat pond all day

W/E 6-18-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked oil on goynepump ok checked pond level ok pivots #19#18 fresh water // #16 wastewater #17 off // wells #1 #2 #3 upmowed around pond

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump low on oiladded oil // switched fresh water to pivot #19 from #18 off cleaned out mud pit fuel up frontend loader and washed it went to lad Irrigation get some new hose barbs replaced nelson Regulator on pivot #17 it had some bad hose barb needed replaced wells #1#2#3 up // pivots #16 waste water #19 resh water #18 #17 offkurt will switch fresh water back to pivot #18

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok // restarted well #3 this mornning wells #1 #2 up pivot #16 waste water / pivot #19 fresh water / pivots #17 #18 off clear heads on pivot #12 / Install new motor on sweco sreen filter systemwaste water is now going through the filter system

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Ph 6.7Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workTook sample to soil-test waterPlant water on #16 Fresh water on #18 and #19 with #17 off for harvest

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Changed tire on #16Took sample to soil-test hayPlant water on #18

Lighting knocked the farm down

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Repaired #16 Bad wirePlant water to #16 Fresh water on #17 #18 and #19Lighting knock out probeHad John and Max work on probe/Got fuel in LTS truckChanged nozzles on new package on #17

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #16 Fresh water on #17and #19 with #18 offUnplugged headsMoved water at plantUnplugged drain by dumpsterTalked to John about LTS break downs

W/E 6-25-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked pond leve ok // pivots on freshwater #17 #19 waste water pivot #16 // wels #1 #2 #3 going getting some fresh water from cox well #1 still onmanual broken probe from lighting 12/pm started up pivot #18 on fresh water keeping good eye on pond leve 3;45 pm shut pivot #19 off due to pond leve getting low

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / checked pond level ok / started up pivot #19 on fresh water #17 #18 also on fresh pivot #16 on waste water / goyne pump sreen at plant automatic valve got stock open ouerflowing waste water all over floorshut screen system off and flushed valve no change / opened bypass system checked on pond getting low shut pivot #18 off

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump added oil / checked on pond ok started up pivot #18 fresh water / shutting off pivot #19 on west stopcleared heads on pivot #18 / oranized inside of LTS truck

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.1Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workswtiched waste water to pivot #18 from #16 / pauls gator had flat tire / he will use LTS gator aqumatic vavle is working swtiched back to sweco srceen and close bypass

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #16 Fresh water on #17 with #18 and #19 offWorked on mainline at plantMet with Steve about pond probe Got sand from LTS to fill mainline hole

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #16 Fresh water on #17 with #18 and #19 offTook diagram to CBM and talked to them about HKV goyne pumpWorked with Kurt on packages and maintainace booksTalked to Carl and talked to Steve about ProbeCleared heads

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #18 Fresh water on #16 and #17 with #19 off for harvestCut tire off #16 took to ok tireReplaced blown head on #16 unplugged 6 heads as wellBought new fridge for sample water modified and installedMoved water at plant worked on tree line

W/E 7-2-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / pond level probe still down well one still on maunalpivot # 16 on fresh water #17 fresh water / pivot #18 on waste waterclear heads on #18

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked going pump ok / swtiched waste water to pivot #16 from pivot #18added some oil on number #2 drip oiler // mowed around pond cleaned out eastside mud pit // washed frontend loader turn on under ground sprinklers around pond

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne added oil ok // dumped peel bin added oil drip oilers #1#2 went to plant paul had prolems with gator emergency brakes stuck fix it fuel up LTS truck and Gas cans for yards ground

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked goyne pump ok / added oil well #1 oiler went pick up tires for yards ground gator went to ok tire put on new tires on yards grounds gator wheels johndeer will calls us when tunup kit gets here for 6x4 gator

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 Fresh water on#16 and #17Had ok tire repair flat tire on LTS truckDid procard paperworkPicked up parts at John DeereMet with Jesse about probe/Replaced greese zerks on Sweeco

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #19 Fresh water on #16 with #18 off for harvest and #17 off for sprayingChanged flat tire on #19 and a driveline took tire to ok tireLTS truck had a flat had that repaired as wellGot sprinklers and risers for PaulWorked on correcting B&D procard

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #16 Fresh water on #17 and #19 #19 broke down repaired it and started it back upUnplugged Endgun on #19 (Beans)Put oil in gearbox #19Changed water at plant

W/E 7-8-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked goyne pump ok / waste water on pivot #16 // fresh water on pivot #17 #19 clear heads on pivot #19 Dennis foster called me for high pit level at plant pit at plant was ok low level / well #1 still Running on manual

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump low on oil added oil ok / fresh water on pivots #17 #19 waste on pivot #16 clean out peel bin on sweco screenWills #1 #2 #3 going // well #1 still running on manual pond level good

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok / pivot #16 waste water // wells #1#2#3 upfresh water on pivots #17 #19 / clear heads on pivot #19 // disribution pump #2 added oil / tune up 4x6 gator / waithing on air fliter will be here mornning at johndeer

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.1Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on goyne pump ok / dropped soil test pivot #16 waste water pivots #17 #19 fresh water wells #1 #2 #3 up / well one still running on manual picked up tire from ok tire / call steve mc cabe get some body well pivot #17 bad leake

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #16 Fresh water on #17 and #19 with #18 offTook samples for #7 to soil-testPicked up air filter for gator installed Got hand washing water Talked to Carl about probe and summer projects

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 Fresh water on #16 and #19Repaired tailgate on LTS truckGot fuel for PaulSwitched goyne pumps couldn’t get small pump to prime switched back talked to DoddsTalked to Renee about probe

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 Fresh water on #16 and #19Changed water at plantWashed LTS truckAdded oil to Goyne pump and filled jugUnplugged heads

W/E 7-16-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / waste water on pivot #17 fresh water on pivots #16 #19 wells #1 #2 #3 // well one still on manualclear heads on pivot#19

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / turn on under ground sprinklers around pond switched waste to pivot #19 /// pivot #17 fresh water pivot #16 fresh water wells #1 #2 #3 going // cleaned and organized shop // organized toolbox on LTS truck cleaned back of truck

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok // fuel up LTS truckdumped sweco peel bin / finshed organizeing shop waste on pivot #19 // fresh water on pivots #16 #17 // wells #1 #2 #3 jeff Grant / Renee work on probe / will work on tomrrow

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.9Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on goyne pump ok / swtiched waste water to pivot #16 // wells #1 #2 #3 fresh water on pivots #17 #19 jeff Grant Renee still working on pond probe

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #16 Fresh water on #17 and #19#19 broke down replaced drivelive and restartedmet with fire pro guy and showed him aroundWorked with Renee on pond probe

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #16 Fresh water on #17 and #19#19 broke down replaced drivelive and restartedTook hay sampleCox #2- 3rd cutting and dropped off at soil-testWashed LTS truck#19 off untill Sunday water on #17 and going to Cox #12

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 7-23-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / plant down wast water on pivot#17 / frsh water on pivot #16 / pivots #18 #19 offwells #1#2#3 up / talked with kurt about switching waste water on Monday morning

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.was going to clean out mud pit frontend loader had flat tire / frank G called ok tire fix it / they will be here tomrrow morning Was going to do some weed triming around pond pivot towers / weed trimmer was broken order parts clear heads on pivots #17 #19 / waste water is on pivot #19 fresh is on pivots #16 #17 wells #1#2#3 up

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on goyne pump ok / waste water on pivot #19 // freshwater on pivots #16 #17wells #1 #2 #3 mowed around pond belt broken x300 mower / picked one up at johndeer / finshed mowing

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workwent to flash east goyne footvavle is stock close / safety meeting with mike dooddschanged broken driveline on pivot #19 and flat tire / dropped tire at ok tire get fix

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 Fresh water on #16 and #19 with #18 offGot fuel in LTS truckGot new hose for high pressure washer for FrankoHad pond probe problems all dayGot Paul a helper for shut down

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #17 Fresh water on #16 and #19 with #18 offWorked on probe for D/S pondTook flat tire for jeep to ok tireTalked to Mike Keeling about helping on B/G

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #19 Fresh water on #16 and #17 with #18 offWorked on tree line Repaired one starterInstalled repaired tire on jeepGot a flat on pauls gator got it repaired and installed back on gatorFought pond all day

W/E 7-30-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked goyne pump ok /pond level low shut pivot #17 filling up pondmowed weeds around big shop / switched waste water to pivot #12 / shut pivot #19 off cleared heads on pivots #17 #19 close main vavle that sends fresh water from cox at pump house

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / checked pond level full to top Turn on under ground sprinkler around pond area / paul called need gas yards ground Sprinkler to water by bean plant got one at lowes fuel up LTS truck / and gas cans Waste water on pivot #12 / fresh water on pivots #16 #17 wells #1 #2 #3 up Cleaned out mud pit washed frontend loader when finshed

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked goyne pump ok / switched waste water to pivot #16 fresh water back on #19 #17 / mowed arund shop

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork. Ph 7.7Prepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workchecked on goyne pump ok / went to lowes got trimline weedeaterSpinklers for frankco G

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 Fresh water on #16 and #19 with #18 offGot old smaller goyne pump running Started tearing down new larger goyne pumpOrdered new belts for goyne pump rebuild

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 8-6-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pumps plants down no power / big goyne pump tearing down to rebuilding checked on pond level ok pivots #17 #18 #19 off / pivot #16 fresh water Wells #1 #2 #3 going sneding fresh water to cox / Rewire meter by shop Drain oil out of big goyne pump started working on it

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / pivots #17 #18 #19 off / pivot #16 fresh water Wells #1 #2 #3 up still sending extra fresh water to cox made appt for LTS truck to get new brakes put on at ok tire on Wednesday at 1pmwent got all meter numbers of all pivots / wroked big goyne pump

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Started effluent sample for pH testing/ Soiltestchecked on pond level ok / went to norco get fulltanks using torch on goyne pump bolts break loosecalled kurt problems with strong winds keep tripping out wells #2 #3 pond lowshutting distirbution pump #2 wells #1 #2 #3 due to strong winds /everything is off

WEDNESDAYPrepared effluent sample for pH testing/ or delivery to Soiltest. E-mailed Dan with results and weekly paper workFuel up LTs truck / restrated all wells / distrbution pump #2 / pivot #16 fresh Smaller goyne pump still down carl will let us know when to restrated / talked to jim clark about tools for impeller / he looking in to itIrrigation specialists here to in stall float shut everything down lower pond adjust float worked on goyne pump 3pm restrated everthing back up filling up pond / specialists will be here to finsh adjustments on float tomrrow

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #18 but fresh #16 on fresh with #17 and #19 down for harvestWorked on goyne pumpHad brake job done on LTS truckWorked on East goyne pump speed and pressure

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Worked on goyne pumpPlant water to #12 Fresh water on #16 with #17 and #19 down for harvestWorked on paperwork correcting and catching upWorked with Carl on East goyne pump would not restart software trouble

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 8-13-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pond level ok / pivots #17 #18 #19 down for harvest pivot #16 fresh water from plant / fuel LTS truck / got gas for yards groundwroked on east goyne pump impelleris ready to come out waiting on tools

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / pivot #19 fresh water / pivot #18 #17 off pivot #16 fresh water wells #1 #2 #3 up / got samples off #17 #19 dropped samples at soil testwroked impellerits ready to break loose tried talk to carl burton about tools will try to talk to him frist thing in morning about tools add oil on gear box on pivot #17 end tower

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pond level ok / goyne pump ok / carl burton said makeup water is going off 1-2 hoursshut goyne pump off no makeup water / pivot #19 off no waste waterfixed blown sprinkler head on pivot #17 / worked on goyne taking off shave / went faber industrail supply got 3/8 trox set makeup water backup goyne pump / pivot #19 waste up / pivot #18 off wells #1 #2 #3 up fresh water on pivots #16 #17

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #19 Fresh water on #16 and #17Worked with Carl about building tools for goyne pumpWorked with Jesse about D/S pond float shut offScreens are now installed need to wait for weld job on #1 filter Got Dan his paperwork to complete last months numbers

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #19 Fresh water on #16 and #17B&G walk around with Chris Barker made listTalked with Tina L about help for paul next week last weekTook sample from ML Cox #7 hayGot fuel in LTS truck/Sent two meters to McCrometer

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 6.3Plant water to #17 Fresh water on #16 and #19Took LTS truck to ok tire bad rear tire had spare put onTook sample to soil-test hayReplaced blown head on #17Showed Bryan Jone how to change water at the plant and what to weed today

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #17 Fresh water on #16 and #19Changed water at plantLTS truck to go to chevy on Monday at 9:30Unplugged headsCleaned up garbage

W/E 8-20-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / big goyne pump still no tools take off impeller clear heads on pivot #17 waste #19 fresh pond level ok pivot #16 fresh wells #1#2#3 up

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on going pump ok / paul can get big 5110 tractor started pivots fresh water #19#16 / waste on pivot #17 Dropped LTS truck at bud clarys for apoointment

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / checked on pond level real low shut off distrubtion pump #2 Pond level full Restarted distrubtion pump #2 / pivots #16 #17 #19 Tlaked carl burton about tools he said is going to assigned somebody to make thimfrank G drop me off at bud clary to pickup LTS truck / clear heads on pivot #19getting samples for soil test cutting hey on circle #2 4th cutting

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level low / shut off distrbution pump #2 / filling pond back up dropped hey samples / waste water soil test monthly meeting with mike doddsIrrigation specialists did some welding on number #2 screen / put float pond level if it gets emty it will shutditrubtion pump off

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 Fresh water on #16 and #19Got tool for goyne pump from CBMRemoved impeller and took to CBMRemoved shaft and shaft housing to CBMWorked on water issue someone is running to much water

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 6.9Found precooker valve on line #2 open line not even runningPlant water to #18 as/per KurtHad oil changed in LTS truckWork on pond level and floatGot bid for tires on LTS truck

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #18 Fresh water on #16 and #17 with #19 offMoved old fridges to supply for extraction of refrigerantRepaired polly hose on small goyne pump packing waterChanged water at plantWatching pond and pit all day

W/E 8-27-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / pond low pivots #17 #18 #16 off 45 mi later pond full everthing up goingadded oil to wells #1 #2 #3 oilers / clear heads on pivot #17 #18 waste is on pivot #18 fresh water on pivots #17 #16

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / checked on pond level ok swtiched pivot Per kurt #17 off fresh on #19 / cleared heads on pivots #17 #19worked on weed trimmer replaced the carrier plate assembly / now wont start Dumped sweco peel bin / cleaned up shop / wells #1 #2 #3 up / #18 waste #19 #16 fresh #17 off

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / switched fresh to pivot #19 / #17 off worked on weed trimmer got it running / pulled weeds around towers #17 #18 #19fresh water on pivots #16 #19 / waste on pivot #18 wells #1 #2 #3 up / clear heads on #18 #19

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / checked on pond level ok switched fresh water to pivot #19 from #16 fresh water on pivots #19 #17 / waste on #18 walked around plant some is using extra fresh water / pit pump wont stop running due to extra water

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Fresh water on pivots #16 #17 / plant water to #18 Got bids for tires had ball joints looked atTalked to Carl about inter locksTalked to Chris about plant using to much waterpulled weeds around goyne pump house

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph6.1Fresh water on pivots #19 #17 / plant water to #18 Got fuel in truckWorked on surge pitWorked with Guy to cut back water flow from plant

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Fresh water on pivots #16 #17 / plant water to #18 Goyne pit is runningnormal without bean plant runningUnplugged heads on #18Float is not working be careful not run pond out of waterChanged water at plant

W/E 9-3-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pond level ok / clear heads on pivot #17 float on pond is not working make sure pond dosn'trun low dumped peel bin to sweco sreen / used magnet get adjustment bolt fail in pit pivots #16 #17 fresh water / pivot #18 waste water / wells #1 #2 #3 up

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / switched fresh water to pivot #19 / from #16 clear heads on pivots #17 #18 #19 / helpped frank G dig out broken frost proof hydrant valvewent to lowe's get new valve / wells #1#2#3 up / waste water on pivot #18

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond levelok / fresh water back to pivot #16 from #19 picked up goyne pump impeller from columbia basin machine Rear spare tire from ok tire picked up / two water filters Opque housing from north 40 for frank gamez left rear tire on LTS truck were loose ok tire put spare on

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / switched fresh water to pivot #19 from #16 clear heads on pivots #17 #18 #19 / monthly safety meeting with mike doddsunloaded goyne pump / impeller by outside pit cover it put yellow caution tape around kurt called swtich waste water to pivot #19 / fresh water on pivot #18 / pivot #16 off couple dayspivots #17 #18 fresh / #19 waste ok tire said did'nt have time work on LTS LTS truck

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #19 Fresh water on #17 with #16 and #18 offMeeting with HR and Dodds and Paul Repaired hole in drop on #19Ordered and got parts for two winter endguns

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 6.5Plant water on #14 Fresh water on #16 and #19Talked to Ronnie at ok tire he will repair truck wheel Tuesday morning when they first openPicked up Goyne pump parts worked to get the restTalked with Paul about water in front of plant and weeds under crabapple treesTalked with Carl about relielf fill in and about sucksion pipe for goyne pump/set up new ir55 endgun for cox farm

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #14 Fresh water on #18 and #19 with #16 and #17 offWorked on goyne pump getting bolts and everything ready to installMoved water at plantUnplugged heads on #14-#18-#19

W/E 9-10-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pond level ok // pivots #16 #17 off // pivot #14 waste water pivots #18 #19 fresh water // clear heads on pivots #19 #14 cleaned and dumped sweco screen peel bin greased sweco motorfuel up LTS truck bolts back on goyne pump

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok // clear heads on #18 #14 #19 Greased distribution pump #2 shut pivot #19 off E-stop // Restarted pivot #16 fresh water switched waste water from pivot #14 to pivot #15 / use R-15 end gun from pivot #14 on #15

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / went to ok tire replaced broken stud on left rear tire clear heads on pivot #15 waste water / clean goyne pump frame using wire brush pivot #16 #18 fresh water / #15 waste water wells #1# 2 #3 up Started painting frame to goyne pump

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / worked on goyne pump all dayper kurt shut pivots #18 #16 fresh water / #15 waste water wells #1#2#3 off

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #15 Fresh water to #18 with #16 #17 and #19 offCleaned up garbage from goyne pump projectDid procard and turned inGot fuel for Paul / worked on ordering glass door for Pauls gatorWorked on bid for fence and ordered tires for LTS truck

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testPlant water on #15 Fresh water on #18 with #16 #17 and #19 offGot fuel in LTS truckGot new tires on LTS truckTalked with Carl about surge pit interlock and suction pipe for goyne pumpMet with guy from fence company about bid for fence repair

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #15 Fresh water on #18 with #16 #17 and #19 offSent E-mail to Tina about mowerswirl tank at fresh pack is not working rightBig wind Sunday night speed #18 up to 90%Worked correcting paperwork

W/E 9-17-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pond level ok / pivots #16 #17 #19 off pvot #18 waste water / well #1 / wells #2 #3 offdumped sweco srceen bin peel / clear heads on pivot #15 waste worked on goyne pump

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok /// clear heads on pivot #15 waste waterworked on goyne pump repalced lantern ring packing beltsand drive sheve

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond ok / waste water on pivot #15 pivots #16 #17 #19 off / wells #2 #3 off / 9;45per kurt shut pivot #18 fresh water distrubtion pump #2 well #1 off / Tomorrow evening started back up pivot #18worked goyne pump / need to call soiltest get there propes out of hay fields kurt ready to cut

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #15 waste water ok / dropped off lawn mower at johndeer get fix Dropped waste water sample at soiltest / picked up nozzles from lad Irrigation Restarted pivot #18 back up fresh water / well#1

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #15 Fresh water on #18 Worked on goyne pumpGot parts for goyne pump/Plant water to #17Reseached safety clips for installation of suction plateTalked to paul about weeds and employee area / Talked to Dave Jolly with Beckwith and Kuffel in Seattle about safety clips

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 6.8Plant water on #17 Fresh water on #18Met with Paul about weedsCleared heads on all pivotsWorked on screensGot meters paid for

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #17 Fresh water on #18Worked on screens we need to get a solenoid for #1 screenMoved water at plantRepaired handline at plantCleared heads on #17

W/E 9-24-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pond level ok / clear heads on Pivot #17 waste water fuel up LTS truck / Oranginezd shop / LTS truckshut pivot #18 3;45 pm per kurt / well #1 OFF

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.CLEARD HEADS ON PIVOT #17 WASTE WATER / DUMPED PEEL BIN FULL OF WATER WENT LADS GOT VALVE SOLNOID WORK ON #1 SCREEN /STILL NOT WORKINGCLEANED EAST MUD PIT / PIVOTS #16 #18 #19 OFF / WELLS #1 #2 #3 OFF

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.WORK ON SCREEN #1 SOLNOID /* HAVING TO REBUILD AQUAMATIC VALVE SCREEN #1CLEAR HEADS ON PIVOT #17 / WROKED ON MONTHLY WROK ORDERWORKED ON WORK ORDERS / PLANT SAFETY MEETING RESTATING PIVOT #18 FRESH WATER AT 55% PSI

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.clear heads on pivot #17 / monthly meeting mike dodds got samples pivot #19 4th cutting dropped samples at soil - test placeworked on aquamatic valve #1screen replaced some parts did'nt wrok restart pivot #19 fresh water / pivot #18 waste #17 fresh well #1 up

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / clear heads on pivots #17 #18 #19 Replaceing the 2' aquamatic valve on #1 screen / went lad and got new valvepaul called lawn mower has flat tire / picked up tire get fix had to get new tube at noth 40pivot #18 fresh #19 fresh #17 waste wells #1 #2 up

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 7.2checked on pond level ok / switched waste to pivot #19 / fresh on pivot #17 replaced some mushroom drain plugs on pivot #17 clear heads fuel up LTS truck / went lad get some drain plugspivots #18 fresh #19 waste #17 fresh wells #1 #2 / worked on screen #1

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / kurt called shut pivots #17 #18 off pivot #19 waste water wells #1 #2 off / finshed up #1 screen Sending waster throught amiad filters

W/E 10-1-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

Pivot #19 waste water / priming water on Pivots #17 #18 #16 off / wells #1 #2 #3 off / finished monthly work ordersorganized inside of LTS truck / washed truck / organized shop clean it cleaned out mud east mud pit / washed frontend loader and greased bearing end of day switched waste to pivot #17 clear heads

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.fuel up LTS truck / gas yards ground / shut priming water off on pivot #17 waste Restarted pivot #18 backup fresh water / well #1 Washed floor organized goyne pump house / sample circle #7 4th cutting dropped sample at soil testclear heads on pivots #17 #18

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / switched screen to bypass plant changing bad bearing on peel auger clear heads on pivots #17 #19 / switched waste water to pivot #19 pivot #18 on fresh water well #1 / plant called done changing bearing waste water going back throuth screen

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pond level ok / monthly meeting dodds burn weeds around pond / changed center drive on pivot #18 universal couplers6 #17 off wells #1 #2

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 all others offGot paul going on his job for todayPaid for john deere mower repairDid procard paperworkTalked to Mike at CBM

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testPlant water to #14 all others offPicked up mower from John DeereTook tire to be repairedTalked to PaulWorked on safety observations

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #14 all others offMoved water at plkantWorked on paperworkTook hr meter readings on all Cox pivots

W/E 10-8-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

pivot #14 on waste water / revers pivot befor it gets bean field wet per kurt dumped peel bin fuel up LTS truck / gas for yards ground started up pivot #18 fresh water well #1 got stuck trying to get to pivot #11 had to call nacho to pull me out Waiting for onions to get picked up befor get to pivot #11

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.switched waste water to pivot #17 / priming water is on help with psi pivot #14 off closed valve / clear heads on pivot #17 shut pivot #18 fresh water off well #1 / cleaned ouit mud pit at plant

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.switched waste water to pivot #12 / from pivot #17 cleaned up pump house / got sample for soil test circle #17 3th cutting dropped it off Pivot #12keeps tripping out going forwared / per kurt run it on revers if it trips out switch back to pivot #17

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.restarted pivot #12 this morning / worked on goyne pump safety meeting pivot #12 stopped running / Replaced bad center drive / magstarter

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water is on #12 all others offMeeting with DoddsTook Pauls gator to John Deere bad CV jointTalked with paul about work to be doneRecorded pivot hour numbers to sheet and sent to Dodds

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 7.1Plant water to #17 all others offTalked with paul about work to be doneGot fuel in LTS truckWorked on gator would not start loose wire

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #17 all others offWorked on goyne pumpRepaired hole in pipe by bean plantChanged water at plant

W/E 10-15-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked pivot #17 waste water on it ok / checked on goyne pump ok cleaned peel screen with bleach / turn on fresh water to check broken pvc pipe mike fix behind bean plant ok finshed cleaning up pump house / switched waste water to pivot #19 clear heads on it pivot #17 off

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #19 broken down / switched waste water to pivot #2 / closed vavles on pivot #6 pivot #2 down kurt checked it out bad center drive / swtiched waste back to pivot #17helpped kurt change bad center drive / close valve to endgun screen on last towershut pivot #17 off sending waste water back to pivot #2 will check pivot #19 tomrrow

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot # 2 ok / oraganized tools clean out LTS truckFuel up LTS / kurt called me said we are getting freezing weather tonight We need to start draining water out of pivots that are off so the vavles wont crack

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #13 all others offRebuilt endgun on #13Blew out sprinkler lines at plant all day

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #13 all others are offWorked on paperworkTook hose we forgot back to moses lake rentalLooked for missing endgunTook Paul pump to do culverts at plant Talked to paul about work for tomorrow and next week

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 6.1Plant water to #14 all others offCleared heads on #14Helped Paul with culvert pumpBuilt second endgun for use on Cox landGot fuel in LTS truck

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #14 all others offPainted blow out tools redDrained clover leaf at #13Worked on paperwork sent to Dan

W/E 10-22-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #14 clear heads ok dumped peel bin / cleaned screen gresaed sweco shaker worked on monthly work orders

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #14 plugged heads / checked on goyne pump ok cleand out mud pit // washed frontend loader / washed down sweco shaker / peel screen filterwent to lowe's get some ugly line for paul's weed trimmer / clear heads on #14

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #14ok / monthly safety meeting / hearing test cleaned west mud pit / washed frontend loader Switched waste water to pivot #15 tower #1 #2 #3 had plugged heads Unplugged heads on pivot #15

WEDNESDAY checked screen filter and pump ststemat main plant. Completed daily paper wrokchecked on pivot #15 ok / monthly meeting mike doddswroked on pivot #19 broken driveline replaced it with new drivelinewent johndeer checked on 4x4 gator not ready

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #2 all others offUnplugged heads on #2 Drained #15Got Franco Rain pants and glovesPut together data on fresh pack for Dodds and deliveredTalked to Paul about next weeks work

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 7.2Plant water on #2 all others offUnplugged heads on #2 Worked on pivots to get them ready for winterChecked on suction pipe for goyne pump will be ready Monday or Tuesday

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #2 all others offUnplugged heads on #2 Worked on winterizationGot new tuper ware for water samples

W/E 10-29-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #2 waste water running ok / had same plugged heads clear out heads At plant #1 amiad seal was leaking I tightened seal up stopped leakingFuel up LTS truck / swiched mud pit east was full

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #2 waste water plugged heads clear heads worked monthly work orders / cleaned sweco screen filter greased it shaker swtiched waste to pivot #17 unplugged heads runing waste for two days per kurt

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #17 runing ok / cleaned sweco screen filter New pipe for goyne pump is here helping eloy unload it off his truck cleaned out west mud pit / washed frontend loader

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #17 ok / monthly safetymeeting doddspicked up gator 4x4 from johndeer / worked on goyne pump installed new pipeswtiched waste water to pivot #18 for two days

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 all others offCleared heads on #19Took fire guy aroundWorked on goyne pumpPaid John Deere for pauls gator

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testPlant water to #2 all others offCleared heads on #2Fixed procard problems and did procard paperworkTalk to Steve about welding and valves

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #2 all others offWorked on goyne pumpPainted suction pipeWashed LTS truck

W/E 11-5-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #2 waste water / clear heads checked on goyne pump ok / cleaned sweco screen filter / greased shaker switched eastside mud pit / westside mud pit full

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #2 waste water clear heads / cleaned sweco screen filterwent lowes got more weed eater twine for paul kurt called 2 days of waste water on pivots #2 #17 / one day on pivots #18 #19 swtiched waste water to pivot #17

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #17 / nov 1 time get all numbers of each pivot cleaned the outside of pum house at plant / fuel up LTS truck

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.swtiched waste water to pvot #19 / help frankco digg a broken pipe bad leak

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test-Took sample to soil testPlant water on #19 all others offWorked on hobo campMeet with cops

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #19 all others offTurned off goyne pump not enough water to keep pump runningWorked with Guy on extra water problem

W/E 11-12-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

plant down/ also goyne pump down 1;pmturn on priming water / amiads system sweco filter shaker /* goyne pump sending waste to pivot #17 / worked some monthly work orders plant starting up on grave yard

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / clean west mud pit/ washed frontend loader swtiched pivot waste from pivot #17 / to pivot #18

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.fixed backflow leak on pivot #2 / fix back flow on pivot #7 changed south meter / swtiched waste water from pivot #18 to pivot #19

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #19 on / went dropped soiltestmonthly meeting frank mike john / fuel up LTS truck meeting with HR about paul / swtiched to pivot #17 with waste water pivot #10 ready to go we did not start up because blue pipe

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #17 / broken down bad gearbox and broken drivelinereplaced bad gearbox and driveline / went to lowe's get some signs posted private propertyPut signs were the homeless gay was staying

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 7.1Plant water to #18 all others offUnplugged heads on #18Met with dig for youMade parts for dig for you job is doneMet with Tina about Paul/Did meter hour numbers

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #19 all others offCleared heads on #19unplugged endgun on #17

W/E 11-19-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked pivot #19 ok swtiched to pivot #17 waste All others are off / cleaned sweco screen / greased shaker swtiched mud pit

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #17 ok / drain oil out of goyne pump #2 at pump house finished monthly work orders turn them in / dumped peel bin washed sweco filter screen Turn in receipt to patsy / finished scraping weeds along fence by pump house at the plantper kurt done water for the year strated drainnig pivots

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #17 waste ok / went lowe's get antifreeze/switched t0 #18Winterized all the pivot drain water out of backflows / and added antifreeze to all pivots

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #18 ok / swtiched over to pivot #19 wastemonthly safety meeting with mike doods / fuel LTS truck got meters out of wells #1#2#3 / down for winter

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #18 waste / swtiched to pivot #17switching to pivot #10whenthey get finised with pipe / there still working

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph 7.0Plant water on #17Worked correcting paperworkTalked to Steve about fire valves

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water to #18 all others offShowed Steve valves to be replaced on #6 and #9Unplugged heads on #18

W/E 11-26-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / cleaned sweco screen filter greased shaker checked on pivot #18 ok / cleared heads on pivot #19swtiched waste water to pivot #19

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #19 ok / went swtich pivots on waste water had no pressurewent check goyne pump was off / carl burton checked main breaker outlets no powercalled max check it out power back on pump going / cleaned out east mud pit washed frontend loader when finished cleannig out mud pit

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #17 ok / wroked on goyne pump impellerunwrapped pivot #19

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.swtiched pivot #9 waste water / monthly meeting with mike doddswroked on big goyne pump made some adjustments on impeller fuel up LTS truck

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Did acall in / checked on pivot #9 waste water Winerized pivot #17 open all drain valves endpulg is top center drive

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test Ph7.2Call in #9 ok

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Came in this morning and found goyne pump running at 64% switched to little pumpfound valve leaking on screen #3 had to change both valves John H. helped me Found Mainline leaking where we put band on added C clamp#9 okay

W/E 12-3-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump ok / cleaned out sweco screen greased shaker clear sprinkler heads on pivot #9 / closed vavles on pivot #7 getting waste water to pivot #7

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on goyne pump ok / clean sweco screen shakerwinterized pivot #19 drain water end cap is on top center drivemorning swtich to pivot #10 it’s unwrap ready to go

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #9 ok / monthly meeting mike dodds swtiched waste water to pivot #10 / changed broken center drive / driveline on pivot #16

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #10 ok / fuel up LTS truck mike 3hr meeting at plant

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #10 was off / restarted pivot #10 this morning Dec 1 went got all meter readying from all pivots unwarped pivot #16 / got it ready for cold weather pivot

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testPlant water on #10 looks goodWashed LTS truckMet with Steve about leak in goyne pump areaDid procard paperworkHad oil changed in LTS truck

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Plant water on #10 looks goodWorked on paperworkUnplugged all heads #10Took sprinkler plates off around towers on #10

W/E 12-10-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked pivot #10 clear heads frist tower looks goodwent to plant cleaned sweco screen with bleach / greased shakercleaned out east mud pit / washed frontend loader when finihed / dumped peel bin

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #10 looked good / cleaned shop fuel up LTS truck / getting things ready to go drain main lines for winterwent fire up sub pump no gas went get gas / sub pump started rigth up drain pivots #16 #18 #19 #15

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #10 ok / swtiched goyne pumps big pump is going

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked on pivot #10 ok / changed burt out ligthes on pump house broke ice build up sprinkler heads on pivot #10 unplugged heads

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.broke ice build up on sringkler heads on pivot #10changed bad aquamatic vavle

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testBroke ice build up on sprinkler heads on pivot #10Thawed frozen dropsTalked with Carl about screen #1Got fuel in LTS truck

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Broke ice build up on sprinkler heads on pivot #10Thawed frozen dropsSwitched to small goyne pump big one was running 64# with 95% pitWatched pit level Talkedf to Don and gran operator

W/E 12-17-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on pivot #10 down / resated pivot going again12;45 went back to check on pivot down keeps on tripping breaker called kurt swtiched waste water to pivot #16 main vavle frozen 45; to thawedwaste on pivot #16 there some springklers heads need unplugged Drain all vavles starting at #14 up to pivot #10

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #16 two spans full of springklers heads plugged up / endgunwroked all day on pivot #16 unplugged endgun / springkler

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.checked pivot #16 ok / went back broke build up ice on pivot #16checked pivot #10 need to replace bad center drive

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Worked thawing and breaking ice on #16 all dayGot fuel LTS truckGot rain gear and gloves

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Shut down #16 and drained Plant is down Put heater in pump houseDrained goyne pump and shut off make up water

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testWorked on meter Removed and found build up on inside of pipe Saw Steve and got 10" valves also talk about bid to repair mainline by goyne pumpWorked on #16 moved it to the rode Talked to Steve about backflow preventor for new well

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Worked on cleaning pipe where meter goes added bleechRemoved pipe treads from #16 endgun and rebuilt endgun valves are offPut enterlock back into play

W/E 12-24-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

checked on goyne pump off / due to plant down / drain water out of mud pits dry them up to clean out mud checked on pivot down lots ice build up on each centerdrive cover with icewas call to plant sanitary pump not cycling alarm was on chris barker and I were looking for shut off swtichbroke ice build up on pivot #16 centerdriver were cover with ice moved it closer to road getting ready fix all hose that have holes

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN / WENT TO NORTH 40 GOT NEW PORPANE HEATER FOR GOYNE PUMP HOUSE LAD IRRGATION GOT SOME HOSE DROPS FOR PIVOT #16REPLACING HOSE DROPS HAVE HOLDS ON THEM

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-test

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

W/E 12-31-16 LAND TREATMENT SITE LOGSUNDAY Checked screen filters and pump system at main plant. Completed daily paperwork.

PLANT DOWN

MONDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

TUESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

WEDNESDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

THURSDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

FRIDAY Checked screen filters and pump system at main plant. Completed daily paperwork.Sent weeks work to soil-testPLANT DOWN

SATURDAY Checked screen filters and pump system at main plant. Completed daily paperwork.PLANT DOWN

APPENDIX H

WSDOE LABORATORY ACCREDITATION

AND

SOIL SCIENTIST CERTIFICATION