300 SOUTH SEVENTH · ROOOM 200 · SPRINGFIELD, ILLINOIS 62701-1681 · (217) 789-2191 · FAX (217) 789-2207
OFFICE OF BUDGET AND MANAGEMENT PURCHASING DEPARTMENT
CITY OF SPRINGFIELD, ILLINOIS
February 5, 2021
TO: ALL BIDDERS
SUBJECT: ADDENDUM #2
Contract #UE21-01-57
138kV Substation Foundations
The following addendum information is being provided to assist you as you prepare your
proposal:
Item 1. Addendum #2
Item 2. Addendum Acknowledgement Form
Please sign the Addendum Acknowledgement Form and insert it in your proposal. Failure to
sign this acknowledgement may result in the rejection of your proposal.
If you have any questions concerning this acknowledgement, please contact me at 217-789-2191,
Extension 6237. I thank you for your interest in this project.
Sincerely,
Anthony Quinones
Assistant Purchasing Agent
ADDENDUM #2
Contract #UE21-01-57
138kV Substation Foundations
This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and
Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information
in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum
affecting the Contract Documents will be incorporated into the Contract by enumeration of the
Addendum in the Owner/Contractor Agreement.
PLEASE SEE THE FOLLOWING ADDITIONAL
INFORMATION, CHANGES AND CLARIFICATIONS:
1. When excavating inside the existing substation area, are we to utilize soft dig and/or air knifetype excavating? If so what are the requirements for this? We will leave that up to thecontractor as to the best method for the excavation. We will be leaving the substation energizedand only taking out the portions to be removed. Regular excavation techniques should be fine.
2. Are there any handling and/or disposal requirements for the spoils generated and the debrisfrom foundations being removed? We do not have anything written for the removal of thespoilage. It should be fine to pile the spoilage in the south end of the substation to be spreadlater.
3. Will CWLP be providing all of the materials for the below grade grounding and conduit work?CWLP will be providing all of the equipment for the ground grid and conduit work requested. Onthe city’s website, the concurrent contract UE21-01-56 – Outdoor Galvanized Steel SubstationStructures has all of the loose material we are requesting for the work to be completed.Anything not shown to complete the work, the contractor can provide. This contract plans areattached in this addendum.
4. Construction specification states a schedule of 3/15/21 through 4/15/21 for the foundationwork? Does the below grade grounding and conduit work need completed within this timeframeas well? Is there flexibility in this timeframe? The intention is mostly for the start date to fallwithin that time frame and to have at least the foundations completed. Our “in service” date forthis project is June 1st. We may have some flexibility for the ground grid to extend to end ofApril.
5. Does the below grade grounding work also include fence grounding? Yes, it will require addingfence grounds. See contract UE21-01-56, from question 3, for materials.
6. Does the existing fence removal fall under this scope, or done by others? The fenceremoval/replacement has already been completed separately.
7. Please confirm this scope only includes below grade work and foundation install and removal –Others will remove and install the substation steel, equipment, jumpers, etc.? The scope of workfor this contract will just be foundation installations/removals and below grade work. CWLP willremove/install new structures and equipment above grade.
8. Drawing “TA-46” (Conduit Plan for Taintor Sub) references “Geolocated Feeders” – Are thesejust referencing some of the existing conduit runs? Please clarify. Yes, we have feeders that runnorth through the yard and have been located. We will relocate the feeders before the start ofthe work.
SPECIFICATIONS & DRAWINGS FOR OUTDOOR GALVANIZED STEEL SUBSTATION STRUCTURES
AND MISCELLANEOUS EQUIPMENT
1.0 SCOPE
A. These technical specifications cover the design, detailing, fabrication and delivery ofeverything necessary for, or incidental to, executing and completing all disconnectswitches, arrestors, structural steel, miscellaneous equipment, and related work asspecified or shown on the drawings. Specific material to be furnished under thiscontract includes two (2) 72.5 kV, 1200 amp, Mindcore, gang-operated, aluminumvertical-break disconnect switches with standard arcing horns, structural steel,switch grounding mats, all fasteners necessary to attach equipment to the steel,insulators, ABB surge arresters, bus connectors, aluminum tube, groundingconductors, and ground connectors.
B. The structures and materials will be installed at the existing Palomino and TaintorSubstations.
C. A prospective bidder who is in doubt as to the meaning of any part of the ContractDocuments, or of any addenda, may submit to the Purchasing Agent a writtenrequest for interpretation. Such requests shall be addressed to:
Office of the Purchasing Agent Phone: (217) 789-2191 Email: [email protected]
Any such interpretation will be made by addendum. City of Springfield will not be responsible for any explanation or interpretation of proposed documents other than by addendum. Any addenda will become part of the Contract Documents.
The bidders are to list any and all exceptions to these specifications.
D. Manufacturer’s cut sheets shall be provided for any equipment that differs fromwhat is specified. CWLP reserves the right to make the determination if equipmentis equal to that specified. Where an item is specified as “No Exceptions”, the exactequipment shall be supplied.
2.0 EXTENT OF CONTRACT
A. These specifications provide the information required by manufacturers to submit aproposal for support steel for an outdoor substation. The steel structure shall be asspecified and include all services inherent in the transaction such as engineering,drawings, fabrication, packaging, or crating, and shipping. All associated equipmentshall be supplied as specified.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
16 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
B. If these specifications call for material, equipment, or manufacturing procedures,different from the manufacturer's standard, the manufacturer shall clearly identifyall deviations or substitution in his bid. When possible, the manufacturer should bidaccording to the specifications with the manufacturer's standard as an option.
3.0 SHIPMENT AND MARKING
A. No shipment shall be made 30 days prior to the requested date without writtenapproval from City. Exact shipment destination will be (unless specified differentlyon the Purchase Order):
Palomino Substation 1650 Bruns Lane Springfield, Illinois 62702
Taintor Substation 1500 Taintor Road Springfield, IL 62707
B. Chris Lucchesi at 217-757-8520 (ext. 2258) shall be notified at least 72 hours(excluding normal holidays and weekends) prior to delivery of the structures.
C. Supplier shall be responsible for and make good any and all damage due toimproper loading and preparation for shipment. The Supplier shall be responsiblefor verifying that the actual delivery can be made to the required location, and shallbe cognizant of any physical limitations affecting delivery. Boxes and crates shall besuitably marked with delivery destination and purchase order number. Each boxand crate shall have a packing list attached to the outside and a second list enclosedshowing the parts contained therein and include the Purchase Order number.
D. The supplier shall suitably box, crate, brace, and otherwise prepare equipment andmaterial for safe shipment, including protection against all environmentalconditions encountered during shipment.
E. Trussed components shall be shipped assembled and all other components shopassembled to the extent that field construction can be completed using normal fielderection procedures.
F. The supplier shall tag each item of equipment with substation location name,contract number, bill of material, and item number for shipment.
G. The supplier shall deliver all structures by truck. Unloading from trucks will beperformed only during the normal 40 hour week, and truck arrivals must bescheduled accordingly.
H. Delivery is required on or before March 31, 2021.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
17 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
I. All materials shall be delivered DDP, Incoterms® 2010 to the Office of PublicUtilities, at each substation address.
4.0 LAWS, SAFETY CODES AND STANDARDS
A. All structures and members shall be designed, constructed, and assembled inaccordance with the following applicable standards.
1. "Specification for the Design, Fabrication and Erection of Structural Steel forBuildings", by the American Institute of Steel Construction (AISC).
2. AWS D1.1, "Structural Welding Code" by the American Welding Society.
3. ASTM A36, "Specification for Structural Steel."
4. ASTM A123, "Specification for Zinc (Hot-Dip Galvanized) Coatings onProducts Fabricated from Rolled, Pressed, and Forged Steel Shapes, Plates,Bars and Strip."
5. ASTM A143, "Recommended Practice for Safeguarding AgainstEmbrittlement of Hot-Dip Galvanized Structural Steel Products andProcedure for Detecting Embrittlement."
6. ASTM A153, "Specifications for Zinc Coating (Hot-Dip) on Iron and SteelHardware."
7. ASTM A307, "Specification for Carbon Steel Externally and InternallyThreaded Standard Fasteners."
8. ASTM A384, "Recommended Practice for Safeguarding Against Warpage andDistortion During Hot-Dip Galvanizing of Steel Assemblies."
9. NEMA Standard Publication SG6 Part 36 "Outdoor Substation."
10. ASTM A385, "Recommended Practice for Providing High Quality ZincCoatings (Hot-Dip) on Assembled Products."
11. ASTM A394, "Specification for Galvanized Steel Transmission Tower Boltsand Nuts."
5.0 DESIGN
A. The design shall conform to the requirements of NEMA Standards Publication SG6Part 36 except as modified herein by these specifications and the accompanyingdrawings.
B. The design shall be based on the following conditions:
1. NESC Heavy- 40MPH wind, 1/2" ice, 1000 lb. in conductor shield wire
UE21-01-56 Outdoor Galvanized Steel Substation Structures
18 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
2. High Wind - 70 MPH wind, 0" ice, 1000 lb. in conductor and shield wire
3. Unbalanced Condition - Conditions 1 and 2 with conductor and shield wire
tensions applied at one end only
4. Short Circuit- Structures supporting rigid bus shall be designed on the basis of ultimate strength design methods to withstand, without permanent deformation, the mechanical effects of short circuit currents based on the worst of the following horizontal loads applied at the elevation of the busses.
a. Short circuit forces based on section 11 of ANSI/IEEE STD 605-1987
where:
F = M x [(43.2 x I2)/(D x 107)]
F = Force in pounds per foot of bus M = A factor to account for fault type and bus location I = RMS symmetrical fault current in amperes (40,000
amperes) D = Phase spacing in inches
b. Maximum rated cantilever strength of the insulators supporting the
bus.
5. Deflection Limits:
a. Horizontal deflection of vertical members at the elevation of the conductor attachments - 1/100 if vertical height
b. Vertical deflection of horizontal members - 1/200 of span
c. Horizontal deflection of horizontal members - 1/200 of span
d. All above limits apply to conditions 1, 2 & 3
6. Design Stresses - SAS allowable stress design with overload factor of
1 (except as noted in 4 above)
7. Shape Factors - (Applied to wind loads) Round surfaces = 1.0 Flat surfaces = 1.6
8. Assume no wind shielding from adjacent components. 9. Conductor and shield wire tensions shall be applied at angles between 0 and
15 Degrees in the horizontal direction. Tensions in each conductor and
UE21-01-56 Outdoor Galvanized Steel Substation Structures
19 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
shield wire shall be applied parallel to each other and in any combination at each end of the structure that imposes a critical loading with respect to meeting the strength or deflection requirements of these specifications on any structural component.
C. All field connections shall be bolted. No field welding will be permitted.
6.0 MATERIAL
A. The 72.5 kV structures shall consist of square tubular steel conforming to ASTM A35 with a minimum of silicon content of 0.1%.
B. Connection bolts and nuts shall conform to ASTM A394. Bolts shall be heavy hex
head with heavy hex nuts and shall be a minimum of 5/8 inch.
C. Washers shall conform to ASTM A36. Dimensions shall be in accordance with ANSI-65, Standard B27-2, Medium class.
D. Each connection shall be furnished with one palnut for locking. E. An excess of twenty-five percent (25%) with a minimum of two of any one size
and/or length of all bolts, nuts and palnuts shall be furnished.
F. Bolt lists shall be furnished stipulating size, type and quantity of bolts, nuts, washers and palnuts.
G. All materials shall be galvanized.
H. Supply Galvanized slip resistant open-type ground mats.
I. Miscellaneous
1. The supplier shall fully fabricate, drill and punch all members for erection,
mounting equipment, grounding connectors, switch operating mechanisms, etc., before galvanizing and shipping.
2. Minimum thickness for connection or equipment mounting plate material
shall be 1/4". 7.0 FABRICATION
A. General
1. Fabrication shall conform to the requirements of the latest revision of the American Institute of Steel Construction's "Specification for Design, Fabrication and Erection of Structural Steel Buildings."
B. Shop Welding
UE21-01-56 Outdoor Galvanized Steel Substation Structures
20 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
1. Shop welding shall conform to the latest revision of AWS D1.1.
C. Workmanship
1. Workmanship and finish shall be equal to the best modern practice for
substation structures. Before being laid out or worked in any way, materials shall be thoroughly straightened in the shop by methods which will not injure it. Templates shall be laid flat without distortion while work is being laid out. Shearing, chipping, and punching shall be neat and accurate, and all portions of the work shall be neatly finished.
2. Holes shall be located accurately to assure that the bolts will be at right
angles to the plane of the connection. The use of drift pins to correct misalignment of holes will not be permitted.
3. Holes for connection bolts shall be 1/16-inch larger than nominal diameter
of the bolt. Holes for anchor bolts in baseplates may be up to 3/16-inch larger than the nominal diameter of the anchor bolt.
4. No hole shall be punched in members within 4" of a point of bending until
the member has been bent.
5. Members which are to be connected to other steel. parts of the structure shall not have an error in length greater than 1/16" for members 30 feet or less in length, and more than 1/8" for members over 30 feet in length.
6. Welded assemblies for galvanized steel structures shall be fabricated before
galvanizing in accordance with the Recommended Practice for Providing High Quality Zinc Coatings (Hot-Dip) on Assembled Products, ASTM Designation A385.
7. The use of a burning torch is permissible for cutting members, provided all
irregular edges are trimmed smooth before galvanizing. Stresses shall not be transmitted into the metal through a burned surface for a distance equal to the thickness of the materials and shall not be considered a part of the net section for tension members. The use of a burning torch for cutting bolt holes will not be allowed.
8. Holes in material 3/4" thick and over shall be reamed after sub-punching or
shall be drilled. Holes in material less than 3/4" thick shall be punched to full size. All holes shall be clean cut and without ragged or torn edges.
9. Structural members, particularly channels, shall be arranged so that there
are no "pocket" spaces which can accumulate moisture without drawing. 8.0 GALVANIZING
UE21-01-56 Outdoor Galvanized Steel Substation Structures
21 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
A. Structural Members
1. After fabrication and before assembly, all material shall be thoroughly cleaned of rust, scale, and grease, and shall then be hot-dip galvanized in accordance with American Society for Testing and Materials Specifications" A123. Coating thickness shall comply with the requirements of ASTM 123. Any member that is machined, bent, or worked in any manner after galvanizing shall be re-galvanized. Surfaces of material shall be free of any foreign substances and shall have the same appearance when received by the owner as when it was shipped from the supplier's plant.
2. A minimum of 3.5 mm thickness of galvanizing shall be utilized over the
entire surface area. Double dipping will not be permitted.
B. Connection Materials
1. Bolts, nuts, and washers, except those conforming to ASTM A394, shall be galvanized per A153.
2. Only the top eight inches of each anchor bolt shall be galvanized.
3. After galvanizing, bolts and nuts shall be assembled and shall have an
interchangeable finger fit without shake. Wrench tightness or spinning fit shall be cause for rejection. Nuts must be tapped or rerun after galvanizing.
C. The supplier shall furnish and ship galvanizing materials to be applied by the
erection contractor to repair damaged galvanized surfaces. The galvanizing material shall be one of these items or an acceptable equal material:
1. "Colo-Golo" as manufactured by Thermacote, Welco Co.
2. "AMCO Galvanized Sticks" by American Solder and Flux Co., of Paoli,
Pennsylvania.
3. "AMCO 321 Galvanizing Power", by American Solder and Flux Co., of Paoli, Pennsylvania.
9.0 MARKINGS
All structural members shall be plainly stamped with a steel die to conform to the piece marks on the erection diagrams and ship detail drawings. Steel shall be stamped before galvanizing. The marks shall be clearly visible after galvanizing.
10.0 INSPECTION
UE21-01-56 Outdoor Galvanized Steel Substation Structures
22 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
A. The supplier shall give the owner free access to this work, and whenever requested shall furnish full information as to the progress of the work in its various parts.
B. The owner reserves the right to determine conformity to the quality specified herein
by any inspection method. Welds and/or other fabrication not conforming to the requirements of these specifications shall be repaired at the supplier's expense.
C. The owner reserves the right to inspect the work either at the place of fabrication or
at the job site. In either case, the supplier shall not be relieved of any responsibility for the quality of material and workmanship, or the conformance to details and dimensions to those shown on the owner's drawings; and any adjustments, changes or repairs, which may be found necessary after the delivery of material, including all additional handling and shipping charges, shall be paid for by the supplier.
D. The failure of the owner to inspect the work, to require testing of a structure or any
part thereof, or to reject any unsatisfactory materials or workmanship shall not relieve supplier of his responsibility for the work.
E. A copy of the following test reports shall be promptly furnished to the owner, as
requested (after fabrication of structures):
1. Certified mill test reports for all structural material.
2. Certified welding reports for each structure.
3. Test reports on coating thickness.
4. Any test reports which indicate non-conformance with the requirements of these specifications shall be grounds for rejection of the affected materials by the owner.
11.0 DRAWINGS AND DESIGN DATA
A. The following shall be submitted for reviews within 60 days after receipt of approved contract.
1. Design data for structure and anchor bolts including foundation reactions. 2. Erection drawing of structure.
3. Setting plan for anchor bolts.
B. Shop drawings shall be submitted for review within four weeks after receipt of the
acknowledgement that the owner's review of the design data and erection drawing has been completed.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
23 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
C. Three print copies of the drawings and data requested in A and B above shall be forwarded to the City.
D. Drawings shall be submitted in AutoCAD 2013 or newer. Files shall have a listing
attached.
E. All drawings and data shall have the substation name above the supplier's standard title block.
F. Acknowledgement of review by the owner of any design data or drawings implies
review of general concept only and does not relieve the supplier of his obligation to comply with these specifications.
G. The owner retains the right to reuse design data and drawings at other locations on
his system.
H. All design data shall bear the stamp of a registered professional structural engineer. 12.0 WARRANTY AND GUARANTEES
A. Material and Workmanship - The supplier shall guarantee that materials which fail, due to defects in materials, design, or workmanship, shall be replaced by the supplier without further cost to the owner.
B. Incorrect Material - The supplier shall further guarantee to replace, repair, or cover
the cost of correcting such material previously installed at no additional cost to the owner.
C. Manufacturer warrants to purchaser that all materials will be new, and that all work
will be of good quality and free from defects in accordance with the Contract Documents and any inspections, tests, or approvals provided for in the Contract Documents.
D. Manufacturer will not be relieved of his guarantee or any other responsibility for the
proper performance of materials and equipment furnished under this Contract by reason of defective installation when installed equipment has been inspected prior to operation by the manufacturer or his authorized representative.
13.0 ACCEPTANCE
A. After delivery, the structure will be inspected and shall be free of dirt, oil blisters, flux, black spots, dross, tear drop edges, flaking paint, or zinc; and in general, shall be smooth, attractive, and unscarred. Structures not meeting this requirement shall be repaired or replaced by the supplier at no additional cost to the owner.
B. The structure will be accepted after all the work included in the Purchase Order is
completed to the satisfaction of the purchaser and when performance guarantees have been met.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
24 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
14.0 REFERENCE DRAWINGS
A. The following drawings are a part of these specifications. 1. 72.5 kV Electrical Arrangement for Palomino Substation
2. 72.5 kV Electrical Arrangement for Taintor Substation
B. The drawings indicate the required location of equipment to be attached to the
structure. These locations shall be maintained and appropriate structural details shall be provided. Fasteners for attachment of equipment to structure shall be provided unless specifically stated otherwise on the drawings. Structural details shall accommodate the materials listed on the drawings.
C. The structural members shown indicate concept only. The supplier shall maintain
all column (structure leg) locations as shown. The supplier is responsible for member sizing and the location of members to provide adequate rigidity and strength to conform to the requirements of these specifications.
15.0 EXPERIENCE
A. Bidders shall submit a list of at least ten (10) installations of outdoor substation structure of the same general type that have been in successful operation for a period of not less than three (3) years. Information shall include contact name and phone number.
16.0 AIR-BREAK DISCONNECT SWITCHES A. Provide two (2) 72.5 kV, 1200 A, aluminum vertical-break disconnect
switches, gang operated, with standard arcing horns, Mindcore – AVX07212. No exceptions shall be made.
17.0 STEEL EQUIPMENT
Steel drawing references can be found on pages 8 & 9 for each substation package under “Section Views” & “Steel Details”. The specific steel to be included is as follows.
A. Eleven (11) single pedestal, 15’ low bus support.
B. Eight (8) single pedestal, 20’ high bus support. C. Sixteen (16) anchor Bolts, 1 ¼” x 44”, S&C Electric Company –
S-81365-2. D. Two (2) 3-phase disconnect switch structures.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
25 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
18.0 INSULATORS
A. Provide sixty (60) 69 kV, 350 kV BIL porcelain station post insulators, 3” B.C., std. strength, ANSI light gray. Insulators should be Lapp - 315216-70.
19.0 SURGE ARRESTERS
A. Provide Eighteen (18) 60 kV, 48 kV MCOV, Polim-S station class surge arresters. Arresters shall be ABB – Q060SA048A, no exceptions.
20.0 BUS CONNECTORS
Provide the following SEFCOR connectors. No Exceptions shall be made. A. One hundred twenty (120) 3” aluminum terminals, bolted, 795 MCM 45/7 to NEMA
4-hole pad, SEFCOR – AFNC-34-4A B. Sixty (60) grounding studs, aluminum, bolted, 3” pipe
to stud, SEFCOR – ATS-62. C. Seventy (70) 3” aluminum tees, bolted, tube to flat, tube size 3
IPS pad: 4-hole pad, SEFCOR – ATF-62-4A. D. Sixty (60) 3” aluminum end plug SPS pipe, internal, SEFCOR – DP-62-
AL.
E. Eighty (80) 3” aluminum bus support, bolted, 3” pipe to insulator, 3” B.C., slip or rigid, SEFCOR – ASTI-62-5.
F. Fifteen (15) 3” aluminum terminals, bolted, 90 degree, 795 MCM to NEMA 4-hole
pad, SEFCOR – AFNC90-34-4A. G. Fifteen (15) 795 AAC/ACSR to 4” 4-hole pad, aluminum terminal, bolted,
45 degree, SEFCOR – AFNC45-34-4A. H. Fifteen (15) aluminum terminals, bolted, expansion, 3” pipe main to 4-
hole pad, SEFCOR – AFXT-62-4A.
I. Thirty (30) aluminum couplers, bolted, 3” pipe to 3” pipe, SEFCOR – ASCT-6262. J. Fifty (50) aluminum bus dampers, for 3” S.P.S. AL. pipe,
SEFCOR – GHJK-DAMP-62-7.
K. Thirty (30) aluminum ground stirrups, bolted 795 KCMIL AAC to Tinner Loop, SEFCOR – AHLSC-34.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
26 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
21.0 ALUMINUM TUBE
A. Forty (40) 3” IPS Sch. 40 aluminum tube bus, 6061-T6 Alloy, in 40’ sections.
22.0 CONDUIT A. Provide 1,300 feet of 4” Sch. 40 Conduit, in 10 foot sections. 23.0 GROUND CONDUCTORS
A. Provide 5,000 feet of 250 MCM bare copper conductor.
1. Conductor shall be soft drawn copper with 37 concentric strands.
2. Conductor must meet ASTM B-3 and B-8.
3. Conductor shall be shipped in approximately 1,000 foot reels.
B. Provide 500 feet of 795 KCMIL aluminum AAC 45/7conductor.
C. Sixty (60) copper ground rods, 5/8” diameter, in 10 foot sections.
24.0 GROUND CONNECTORS
A. Two hundred (200) Cadweld shots, 300PLUSF20.
B. Eight (8) Cadweld molds, crosses, TAC-2V2V.
C. Provide 5,000 feet of #2 Copperweld. 1. Copperweld - CCS01024DR10. 2. 40%, 2 AWG (0.2576”) Copperweld wire. 3. Annealed - Q6C257A. 4. Supplied on wooden reel. 5. Must be Copperweld brand. No exceptions.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
27 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
25.0 ACCESS
A. The City shall at its option be granted access to all documents and records necessary to verify conformance to the contract requirements and to observe routine work and inspect work in progress.
B. Access will be during normal working hours unless other times are mutually agreed
to or work is performed at other times.
C. The conditions of this Section apply to the manufacturer to which a contract is awarded, and to all subcontracted suppliers.
D. The conditions of this Section shall not relieve the manufacturer of any
responsibility for conformance to the requirements of this document. 26.0 INDEMNIFICATION
A. The supplier will indemnify and hold the City of Springfield and Advantage Engineering, Inc. and their respective officers, directors, trustees, employees, and agents and each of them harmless against any and all claims, demands, and choices in action arising out of this agreement, and from any and all complaints or suits made or brought for injury to persons or property caused by the supplier, its agents, employees, or independent contractors in performance of the work and services under this agreement, excepting those caused by negligence of any entity or person to be indemnified hereunder.
B. The supplier shall indemnify the City of Springfield and Advantage Engineering, Inc.
against any and all demands for or assessments of civil penalties, including stipulated penalties including attorney's fees and costs incurred by them to oppose any such demands or assessments, arising out of the performance of the work by the supplier, excepting those demands or assessments caused by negligence of the City of Springfield and Advantage Engineering, Inc. and their respective officers, directors, trustees, employees and agents.
27.0 BIDDER QUALIFICATIONS
A. Qualifications of Bidders shall include:
1. Be regularly engaged in the fabrication of transmission substation structures.
2. Have previously designed and fabricated substation structures of the
general type specified herein.
3. Maintains a qualified design staff regularly devoted to the development of stress diagrams and structural drawings and details associated with substation structure design and fabrication.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
28 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
4. Can furnish evidence of design and fabrication of at least three substation
structures for 72.5kV or higher. 28.0 MISCELLANEOUS
The Notice, Instruction to Bidders and General Conditions set forth in Section I and the Specifications & Drawings set forth in Section II will be the prevailing conditions of this Contract. Any exceptions to these terms and conditions must be addressed with respect to the specific page, paragraph and number and added to the proposal section of this Contract. Any Terms and Conditions submitted otherwise will not be considered or accepted for award of bid.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
29 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
PROPOSEDSTATIC POLE
PROPOSEDSTATIC POLE
EXISTINGWOOD POLE
7#8 ALUMOWELD
SPAN = 129'
7#8
ALUM
OWEL
D
SPAN
= 1
32'
7#8 ALUMOWELDSPAN = 121'-3"
TaintorSubstation
City Water, LightAnd Power
JPO
11TA-113
TA-113 - OVERALL SITE LAYOUT
OVERALL SITE LAYOUT
05/29/2020 1"=30'-0"
JFJJPO
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
HOLD
1
UE21-01-56 Outdoor Galvanized Steel Substation Structures
30 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
14'-0"12'-0"14'-0"14'-0"
12'-0
"5'
-0"
6'-3
"
F1-1F2-2
F4-1
F2-4
F1-3
F2-3
F1-4
F2-5
F1-5
F5-1
F6-1
F6-2
12'-0"
17'-0
"12
'-0"
F2-1
F1-2
21'-0"
34'-0
"
12'-0
"
F3-1
F5-2
F5-3
F5-4
4'-6"
4'-6"
4'-6"
4'-6"
CONSTRUCTION NOTE:1. FIELD TO REMOVE SWITCH STRUCTURE AND CUT DOWN ANCHOR BOLTS.
REFERENCES:S100_ _ _ _ _STRUCTURAL GENERAL NOTESS101_ _ _ _ _FOUNDATION SCHEDULES102_ _ _ _ _FOUNDATION DETAILSS103_ _ _ _ _FOUNDATION DETAILS
5'-0" 29'-3"
NEW STATICPOLE
NEW STATICPOLE
BENCHMARK
2'-0"
14'-2
"
HOLDHOLD
TAINTORSubstation
City Water, LightAnd Power
JPO
11TA-11.1
FOUNDATION PLAN
FOUNDATION PLAN
05/29/2020
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
JPO JFJ
NTS
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
1A
UE21-01-56 Outdoor Galvanized Steel Substation Structures
31 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
EXISTING GROUND CONDUCTOREXISTING GROUND CONNECTIONPROPOSED GROUND CONDUCTOREXOTHERMIC CONNECTIONSUL LISTED COPPER CLAD GROUND ROD 58" X10'-0" LONG
18'-0
"
33'-0" 42'-0" 34'-0" 8'-0"
4/0 (TYP.)
4'-7"
3'-0"
LEGEND
18'-0
"16
'-0"
24'-4
"
3'-0"
54'-0" 14'-0"
1. FIELD TO REPAIR OR REPLACE ANY GROUND CONDUCTOR DAMAGED DURING EXCAVATING OR CONSTRUCTION.
CONSTRUCTION NOTES:1. ALL NEW GROUND CONDUCTOR SHALL BE 250 MCM STR. BARE COPPER UNLESS OTHERWISE NOTED.2. ALL BELOW GRADE GRADE GROUND GRID CONNECTIONS SHALL BE EXOTHERMIC TYPE.
NOTES:GROUND MAT
PROPOSEDSTATIC POLEHOLD
HOLD
TaintorSubstation
City Water, LightAnd Power
JPO
11TA-41.1
GROUNDING PLAN
GROUNDING PLAN
XX/XX/2020
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
1" = 15'
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
1A
JFJJPO
1A
UE21-01-56 Outdoor Galvanized Steel Substation Structures
32 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
C001C002
C3
4" SCH.40PVC
CONDUIT SCHEDULECONDUIT # FROM TO LENGTH
C001 CONTROL HOUSE 72.5KV BREAKER 105'-0"C002 CONTROL HOUSE 72.5KV BREAKER 105'-0"C003 CONTROL HOUSE CAP BANK PT 155'-0"C004 CONTROL HOUSE CAP BANK PT 190'-0"'C005 CONTROL HOUSE CIRCUIT SWITCHER 130'-0"C006 CONTROL HOUSE CIRCUIT SWITCHER 170'-0"
C4
4" SCH.40PVC
C005,C006
C006
C3
4" SCH.40PVC
C003, C004
C004
HOLD HOLD
TAINTORSubstation
City Water, LightAnd Power
JPO
11TA-46
CONDUIT PLAN
CONDUIT PLAN
05/29/2020
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
JPO JFJ
1"=20'-0"
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
LEGEND
EXISTING FENCE-LINE
PROPOSED FENCE-LINE
CENTERLINE
EXISTING CONDUIT
PROPOSED 4" SCH. 40 CONDUIT
EXISTING CABLE TRENCH
UNDERGROUND FEEDER CONDUIT
1AGEOLOCATED FEEDERS
1A
UE21-01-56 Outdoor Galvanized Steel Substation Structures
33 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
B/L
B/L
CONT'D ONTA-11.3 SHEET 2
CONT'D ONTA-11.3 SHEET 2
153'-6"
20'-0" 29'-3" 28'-0" 47'-0"
1718
69C10
27'-4" 29'-3"
98'-0
"
37'-3
"34
'-0"
21'-3
"5'
-6"
12'-0"
3'-6"
PROPOSEDSTATIC POLE
PROPOSEDSTATIC POLE
HOLDHOLD
FOR RECORD
TaintorSubstation
City Water, LightAnd Power
JPO
21TA-11.3
TA-11.3 - GENERAL ARRANGEMENT
GENERAL ARRANGEMENT
05/29/2020 1"=20'-0"
JFJJPO
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
SEE DRAWINGFOR REMOVALS FOR REVISIONREV.
JOB No.
REM-TA-11.3 SH.1
2030
11
REFERENCES:GENERAL ARRANGEMENT SHEET 2_ _ _ _ _ TA-11.3 SH 2
NOTES:EXISTING FENCE LINE IS TO BE REPLACED AS REQUIRED TO MAINTAIN20'-0" CLEARANCE FROM NEW EQUIPMENT.
1A
FOUNDATION PLAN_ _ _ _ _ _ _ _ _ _ _ _ _ TA-111CONDUIT PLAN_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ TA-46GROUNDING PLAN_ _ _ _ _ _ _ _ _ _ _ _ _ TA-41.1
UE21-01-56 Outdoor Galvanized Steel Substation Structures
34 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
108'
-0"
163'-6"
CONST. NOTE 1
1718
TraintorSubstation
City Water, LightAnd Power
JPO
21REM-TA-11.3
REM-TA-11.3 - GENERAL ARRANGEMENT
GENERAL ARRANGEMENT
05/29/2020 1"=20'-0"
JFJJPO
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
FOR REMOVAL
CONSTRUCTION NOTE:1. FIELD TO REMOVE DIS. SW. 1718 FROM
EXISTING SWITCH STAND. SWITCH STANDTO BE RE-USED. FIELD TO REMOVEOPERATOR STAND
UE21-01-56 Outdoor Galvanized Steel Substation Structures
35 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
5'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 5'-0" 14'-0" 21'-0"
8'-1
0"16
-0"
9'-2"
8'-1
0"8'
-10"
17'-0"
5'-0
"7'
-0"
7'-0
"10
'-0"
2'-0"
7'-0
"5'
-0"
29'-3"
1718
5'-6
"B
A
A
10'-0
"
S2 S2
(32'
-6")
(32'
-6")
(32'
-6")
3" ALSPS
B1
(33'
-0")
F F F
HIGH
BUS
(31'-6")
F F F
S S S S S S
S
S
S
E1
C∅ B∅ A∅
F
F
F3" ALSPS
B1S1
S S S
F
F
F
E2
(31'-6")
(31'-6") (23'-6")
(23'-6")
(23'-6")
(33'
-0")
(33'
-0")
F6
S1
S1
S2
S1
S2 S2
F6
7'-0
"
153'-6"
20'-0" 29'-3" 28'-0"
37'-3
"34
'-0"
21'-3
"
98'-0
"
B
AS2 S2
S
S
S (32'
-6")
(32'
-6")
(32'
-6")
B∅ 3" ALSPS
B1
S
S
S
C∅
A∅
(33'
-0")
F F F
HIGH
BUS
(31'-6")
F F F
S S S S S S
S
S
S
E1
C∅ B∅ A∅
F
F
F3" ALSPS
B1S1
S S S B2795 KCMIL
ACSR
B2795 KCMIL
ACSR
F
F
F
E2
(31'-6")
(31'-6") (23'-6")
(23'-6")
(23'-6")
(33'
-0")
(33'
-0")
(28'
-0")F6
69C10
S1
C∅ B∅ A∅
S1
S2
S1
B2
S2 S2
F6
C11
C10
15'-6
"
27'-4"
S3
S1
12'-0"
C∅
B∅
A∅
20 MVARCAP BANK 1
E3 E6
E3
C10F
C∅
B∅
A∅
20 MVARCAP BANK 2 C11F
E6
47'-0" 29'-3"
1718
B/L
CONT'D ONTA-11.3 SHEET 1
B/L
CONT'D ONTA-11.3 SHEET 1
F F F
3'-9
"
E7
E5F5
F6
B2
B
E8
E2
(29'-0")
(28'
-0")
(28'
-0")
(29'-0")
(29'-0")
5'-6
"
3'-6"
2'-0
"23
'-4"
5'-0"
3'-1"
4'-1
0"
NEWWOODPOLE
NEWWOODPOLE
E8
7#8 ALUMOWELD
7#8 ALUMOWELD
7#8 ALUMOWELD
HOLD
HOLD
795 KCMILACSR
8'-1
0"
TaintorSubstation
City Water, LightAnd Power
JPO
22TA-11.3
TA-11.3 - GENERAL ARRANGEMENT
GENERAL ARRANGEMENT
05/29/2020 1/8"=1'-0"
JFJJPO
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
FOR ENGINEERING REVIEW
** NOT FOR CONSTRUCTION **PRELIMINARY
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
NEW ADDITIONS
LEGEND:BUS DAMPER, ITEM
(XX') BUS SECTION LENGTH'F' DENOTES FIXED TYPE FITTING'S' DENOTES SLIP TYPE FITTING
XX BILL OF MATERIALS CALLOUT, SEE TA-91.1
PROPOSED FENCE-LINE
CENTERLINE
REFERENCES:TA-11.3 SH1_ _ _ _ _ _ _ GENERAL ARRANGEMENTTA-111_ _ _ _ _ _ _ _ _ _ FOUNDATION PLANTA-46_ _ _ _ _ _ _ _ _ _ _CONDUIT PLANTA-41.1_ _ _ _ _ _ _ _ _ _GROUNDING PLANTEL-804_ _ _ _ _ _ _ _ _ _STATION SECTIONSTA-00001-001_ _ _ _ _ _ _BILL OF MATERIALS
NOTES:EXISTING FENCE LINE IS TO BE REPLACED AS REQUIRED TO MAINTAIN A16'-0" DRIVE PATH FROM NEW EQUIPMENT
CONST. NOTE 1
BREAK LINE
DISC. SW. OPERATOR
B/L
X
F8
CONSTRUCTION NOTE:1. FIELD TO REMOVE DISC. SW. 1718 FROM STAND.
CUT EXISTING BUS BACK AND USE COUPLERS TOEXTEND NEW BUS TO NEW INSULATORS.SEE TEL-804 FOR MORE DETAILS.
UE21-01-56 Outdoor Galvanized Steel Substation Structures
36 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
10'-0" 7'-0" 7'-0" 1'-9" 2'-0"
22'-0
"
3'-6
"8'
-0"
4'-4
3 4 "
6'-3"
15'-0
"
12'-0"
20'-0
"
20'-0"
FENCE
EXISTINGFENCE
795 KCMIL ACSR
9'-2"21'-0"14'-0"
F5
69KV PT(B∅ ONLY)
2'-0"
69C10
B1
E5
S2
F4F3
B2
F1
F5
E5
S1
F3F4
B2
E3
E6
12'-0"14'-0"14'-0"12'-0"
S2
F4
E5
E5
S1
5'-0
"
F4
S2
E5
E5
S1
F6F3 F3
F7
3" ALS.P.S.
S1
17'-0"12'-0"
S2
E5
F4F3
F5F3
E5
F7
F7
(F.S)
B1
3" ALS.P.S.
(F.S)
(F.S)
F7
795KCMIL ACSR
C1020 MVAR
CAP BANK 1
C10F
E2
B2795KCMIL
ACSR
5'-0"12'-0"
F1
F3
F3F3
795 KCMIL ACSR
B2
795 KCMIL ACSRB2
F9
F9
F10
F10
S3 F4F3
E5F5
B1
3" ALS.P.S.
E7
F3F3
F6
E1
"S""F"
"S" "S" "F"
ELEVATION A-A(LOOKING EAST)
ELEVATION B-B(LOOKING NORTH)
F11
F4F3
F4F3
TaintorSubstation
City Water, LightAnd Power
JPO
11TEL-804
TEL-804- STATION PLAN AND SECTIONS
SECTION VIEWS
09/08/20
JPO JFJ
FOR ENGINEERING REVIEW** NOT FOR CONSTRUCTION **
PRELIMINARY
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
1/4" = 1'-0"
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 09/10/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BIDREFERENCES:
GENERAL ARRANGEMENT SH1_ _ _ _ _ _ _ TA-11.3 SH1GENERAL ARRANGEMENT SH2_ _ _ _ _ _ _ TA-11.3 SH2BILL OF MATERIALS_ _ _ _ _ _ _ _ _ _ _ _ TA-91.1
EXISTING
UE21-01-56 Outdoor Galvanized Steel Substation Structures
37 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
20'-0
"
7'-0" 7'-0"
7'-0" 7'-0"
12'-1
1 2"
17'-2
3 8"
BOTT. OF BASE
15'-0
"
12'-2
3 8"
BOTT. OF BASE
7'-0" 7'-0"
3 5 8"
30"
30"
3 5 8"
3'-0
"
BOTT. OF BASE
15'-6
"
3'-0
"
3'-4
1 2"
4'-0"
3'-0
"
TaintorSubstation
City Water, LightAnd Power
JPO
11TA-S-000001
TA-S-000001 - STEEL DETAILS
STEEL DETAILS
09/08/20
JPO JFJ
FOR ENGINEERING REVIEW** NOT FOR CONSTRUCTION **
PRELIMINARY
1 XX/XX/20 BHMG ADDED CAPACITOR BANK
3/8" = 1'-0"
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 09/17/20 ISSUED FOR REVIEW1B 10/30/20 ISSUED FOR REVIEW1C ISSUED FOR BID12/07/20- - -REFERENCES:
GENERAL ARRANGEMENT SH1_ _ _ _ _ _ _ TA-11.3 SH1GENERAL ARRANGEMENT SH2_ _ _ _ _ _ _ TA-11.3 SH2SECTIONS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ TEL-804
THREE PHASE HIGH BUS SUPPORT THREE PHASE SWITCH STANDTHREE PHASE LOW BUS SUPPORT
SWITCH OPERATOR PLATFORM
UE21-01-56 Outdoor Galvanized Steel Substation Structures
38 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
1A
NEWLIGHTNING
MAST
7#8 ALUMOWELD
SPAN = 176'-6"
7#8 ALUMOWELD
SPAN = 176'
EXISTING WOODPOLE
HOLD
7#8 ALUMOWELD
SPAN = 181'
EXISTING WOODPOLE
PALOMINOSubstation
City Water, LightAnd Power
JPO
X1A-1647A
A-1647A.DWG
-
SITE PLAN
1" = 30'-0"
138/69KV - 69/12.5KVSUBSTATION
1 XX/XX/20 BHMG - - -CAP BANK ADDITION
- - - - - --
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
- JFJEDT
-
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
-X-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
PRELIMINARY
NOT FOR CONSTRUCTION
UE21-01-56 Outdoor Galvanized Steel Substation Structures
39 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
132'
-0"
18'-0
"18
'-0"
6'-0
"6'
-0"
4'-0
"4'
-0"
5'-0" 9'-6" 20'-0" 15'-0" 15'-0" 22'-0" 28'-0" 20'-0" 18'-0" 10'-0" 10'-0" 14'-0"
8'-0" 8'-0"
8'-0
"8'
-0"
28'-0
"8'
-0"
8'-0
"
3'-6
"3'
-6" 3'
-10"
1'-8" 1'-8"
3'-1
0"
19'-0
"
21'-6
"
43'-0
"
4'-0" 4'-0"
8'-0
"8'
-0"
8'-0"
7'-0
"
18'-0"
13'-0"
27'-0" 10'-0"
15'-0
"18
'-0"
15'-0
"15
'-0"
5'-0
"5'
-0"
5'-0"5'-0"
2'-6
"2'
-6"
15'-0
"
25'-0"7'-0"11'-0"13'-0"
2'-6
"2'
-6"
1'-6"
1'-6"
4'-0
"4'
-0"
1'-9"
10'-0"
2'-6
"2'
-6"
3'-1
0"3'
-10"
1'-8"
4'-6
"4'
-6"
10'-0" 10'-0" 12'-0"
2'-6
"2'
-6"
5'-0
"5'
-0"
3'-6"3'-6"
4'-0
"4'-0
"
15'-0
"15
'-0"
15'-0
"15
'-0"
4'-6
"4'
-6"
14'-0"
3'-1
0"3'
-10"
1'-8"
39'-0
"
4'-0
"4'
-0"
8'-0
"8'
-0"
22'-6
"
28'-0"22'-0"15'-0"15'-0"
72'-0"9'-6"5'-0"
6'-8
"6'
-8"
2'-912"2'-91
2"
18'-0
"18
'-0"
18'-0"
6'-0
"
6'-0
"6'
-0"
CONTROL HOUSE
N
KJR
P
M
Y Y
X(TYP.)
M
Y Y
X(TYP.)
KJR
KN
Y Y
X(TYP.)
K
SEEB-1427
B
B
B
B
B
A
AA
'C'
'B'
'B'
'B'
'B'
'B'
'B'
'E'
'E'
'A''B'
'B'
'C'
'E' 'E'
'E' 'E'
'E' 'E'
'C' 'R'
'C' 'R'
'C' 'D'
'C' 'D'
'B' 'B'
'B' 'B'
'B' 'B'
A
B
J
K
M
B1
N
P
R
8102108
2
6
31
AE83-40,BA83-40,JAE83-40,KAE83-40,M
AE83-40,B1
AE83-40,N
AE83-40MPAE83-40,R
AE65-33.6-E83-40-A 324084024
8
24
124
17220TOTAL
FOUNDATION NOTES:F1 - LEVELING NUT ANCHOR BOLT TABLE (SEE DWG. AE65-56, SH.7AG FOR ANCHOR BOLTS)F2 - LOADING SHOWN ARE THOSE OBTAINED WHEN THE MAXIMUM UNBALANCED DESIGN
LOADS ARE APPLIED TO THE STRUCTURE.STRUCTURE WEIGHTS HAVE NOT BEEN USED TO REDUCE UPLIFT, OR OVERTURNINGMOMENTS.
13'-0" 10'-0" 10'-0" 12'-0"
14'-0"12'-0" 17'-2"11'-0"11'-0"15'-0" 12'-0"
12'-0
"16
'-0"
16'-0
"12
'-0"
F3-3
F3-2
F3-1
F1-5 F1-6
F1-2 F1-4F1-1
F2-1
F6-1
F4-1
F5-2
1A
21'-0" 21'-0"
F1-3 F4-2
F4-3
F4-4
F5-1
4'-6
"4'
-6"
4'-6
"4'
-6"
REFERENCES:S100_ _ _ _ _STRUCTURAL GENERAL NOTESS101_ _ _ _ _FOUNDATION SCHEDULES102_ _ _ _ _FOUNDATION DETAILSS103_ _ _ _ _FOUNDATION DETAILS
REFERENCES:S100_ _ _ _ _STRUCTURAL GENERAL NOTESS101_ _ _ _ _FOUNDATION SCHEDULES102_ _ _ _ _FOUNDATION DETAILSS103_ _ _ _ _FOUNDATION DETAILS
LIGHTNINGMAST
BENCHMARK
HOLD
36'-0"
5'-0
"
1/2"
SCALE: FULL SIZE
1" 0 2"1"
PALOMINOSubstation
City Water, LightAnd Power
J. MERCIER
54A-1647
A-1647-4.DWG
03/11/94
FOUNDATION LAYOUT
3/32" = 1'-0"
138/69KV - 69/12.5KVSUBSTATION
1 XX/XX/20 BHMG - - -ADDED CAPACITOR BANK
- - - - - --
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
- --
-
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
-1A-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
PRELIMINARY
NOT FOR CONSTRUCTION
UE21-01-56 Outdoor Galvanized Steel Substation Structures
40 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
132'
-0"
18'-0
"18
'-0"
6'-0
"6'
-0"
4'-0
"4'
-0"
5'-0" 9'-6" 20'-0" 15'-0" 15'-0" 22'-0" 28'-0" 20'-0" 18'-0" 10'-0" 10'-0" 14'-0"
8'-0" 8'-0"
8'-0
"8'
-0"
28'-0
"8'
-0"
8'-0
"
3'-6
"3'
-6"
3'-1
0"
1'-8" 1'-8"
3'-1
0"
19'-0
"
21'-6
"
43'-0
"
15'-0" 8'-0" 5'-0"
14'-0"
4'-9" 4'-9"
9'-9
"9'
-9"4'-0" 4'-0" 4'
-0"
4'-0
"
5'-0
"5'
-0"
6'-1 2"
6'-1 2"
8'-0
"8'
-0"
8'-0"
7'-0
"
18'-0"
13'-0"
27'-0" 10'-0"
15'-0
"18
'-0"
15'-0
"15
'-0"
5'-0
"5'
-0"
5'-0"5'-0"
2'-6
"2'
-6"
15'-0
"
25'-0"7'-0"11'-0"13'-0"
2'-6
"2'
-6"
1'-6"
1'-6"
4'-0
"4'
-0"
1'-9"
10'-0"
2'-6
"2'
-6"
3'-1
0"3'
-10"
1'-8"
4'-6
"4'
-6"
10'-0" 10'-0" 12'-0"
2'-6
"2'
-6"
5'-0
"5'
-0"
3'-6"3'-6"
4'-0
"4'
-0"
15'-0
"15
'-0"
15'-0
"15
'-0"
4'-6
"4'
-6"
14'-0"
3'-1
0"3'
-10"
1'-8"
39'-0
"
4'-0
"4'
-0"
8'-0
"8'
-0"
22'-6
"
28'-0"22'-0"15'-0"15'-0"
72'-0"9'-6"5'-0"
6'-8
"6'
-8"
2'-912"2'-91
2"
18'-0
"18
'-0"
18'-0"
6'-0
"
6'-0
"6'
-0"
CONTROL HOUSE
N
KJR
P
M
Y Y
X(TYP.)
M
Y Y
X(TYP.)
KJR
KN
Y Y
X(TYP.)
K
SEEB-1427
B
B
B
B
B
A
AA
'C'
'B'
'B'
'B'
'B'
'B'
'B'
'E'
'E'
'A''B'
'B'
'C'
'E' 'E'
'E' 'E'
'E' 'E'
'C' 'R'
'C' 'R'
'C' 'D'
'C' 'D'
'B' 'B'
'B' 'B'
'B' 'B'
A
B
J
K
M
B1
N
P
R
8
102
10
8
2
6
3
1
AE83-40,BA83-40,J
AE83-40,K
AE83-40,M
AE83-40,B1
AE83-40,N
AE83-40MP
AE83-40,R
AE65-33.6-E83-40-A 32
408
40
24
8
24
12
4
17220TOTAL
FOUNDATION NOTES:F1 - LEVELING NUT ANCHOR BOLT TABLE (SEE DWG. AE65-56, SH.7AG FOR ANCHOR BOLTS)F2 - LOADING SHOWN ARE THOSE OBTAINED WHEN THE MAXIMUM UNBALANCED DESIGN
LOADS ARE APPLIED TO THE STRUCTURE.STRUCTURE WEIGHTS HAVE NOT BEEN USED TO REDUCE UPLIFT, OR OVERTURNINGMOMENTS.
13'-0" 10'-0" 10'-0" 12'-0"
CONST.NOTE 1
PALOMINOSubstation
City Water, LightAnd Power
J. MERCIER
X4REM-A-1647
A-1647-4.DWG
03-11-94
FOUNDATION LAYOUT
1" = 10'-0"
138/69KV - 69/12.5KVSUBSTATION
- - - - - --
- - - - - --
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
- --
-
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
-X-
A1 07/28/20 ISSUED FOR REVIEWA2 09/17/20 ISSUED FOR REVIEWA3 ISSUED FOR REVIEW10/30/20A4 12/07/20 ISSUED FOR BID
PRELIMINARY
NOT FOR CONSTRUCTION
CONSTRUCTION NOTE:1. FIELD TO COMPLETELY REMOVE FOUNDATIONS IN THIS
LOCATION.
FOR REMOVAL
UE21-01-56 Outdoor Galvanized Steel Substation Structures
41 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
23'-6" 31'-0" 23'-0"
12'-0
"
10'-0
"18
'-0"
10'-0
"
14-0
"
PROPOSEDWOOD POLE
33'-0"
PALOMINOSubstation
City Water, LightAnd Power
-
X5A-1647
A-1647-5.DWG
10/29/93 3/32" = 1'-0"
138/69KV - 69/12.5KVSUBSTATION
1 XX/XX/20 BHMG - - -ADDED CAPACITOR BANK
- - - - - --
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
- -JM
-
CONDUIT & GROUNDING LAYOUT
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
CONSTRUCTION NOTES:1. ANY GROUND GRID CONDUCTOR THAT IS DAMAGED
DURING THE CONSTRUCTION PROCESS SHALL BEREPAIRED OR REPLACED.
LEGEND
GROUND TAP250 MCM GROUND CONDUCTOREXOTHERMIC CONNECTIONSUL LISTED COPPER CLAD GROUND ROD5
8" X 10'0" LONGGALVANIZED STEEL GRATEPROPOSED 4" SCH. 40 CONDUIT
NOTES:1. ALL NEW GROUND CONDUCTOR BE 250 MCM STR. COPPER UNLESS OTHERWISE NOTED2. ALL BELOW GRADE GROUND GRID CONNECTIONS TO BE EXOTHERMIC TYPE.3. FIELD TO CONNECT NEW GROUND CONDUCTOR TO EXISTING GRID AT ALL CROSSINGS
1A
HOLD
UE21-01-56 Outdoor Galvanized Steel Substation Structures
42 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
70' E
DGE
OF B
LDG
CONST.NOTE 1
PALOMINOSubstation
City Water, LightAnd Power
-
X5REM-A-1647
REM-A-1647-5.DWG
10/29/93 1" = 10'-0"
138/69KV - 69/12.5KVSUBSTATION
1 XX/XX/20 BHMG - - -CAPACITOR BANK ADDITION
- - - - - --
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
- -JM
-
CONDUIT & GROUNDING LAYOUT
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
ILLINOIS LICENSE NO. - 184004266-002
--/--/--
-X-
1A 07/28/20 ISSUED FOR REVIEW1B 09/17/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
CONSTRUCTION NOTES:1. FIELD TO REMOVE FOUNDATIONS. GROUND TAPS TO
BE CUT BELOW GRADE AND ABANDONED. GROUNDGRID TO BE LEFT INTACT.
2. ANY GROUND GRID CONDUCTOR THAT IS DAMAGEDDURING THE CONSTRUCTION PROCESS SHALL BEREPAIRED OR REPLACED.
FOR REMOVAL
UE21-01-56 Outdoor Galvanized Steel Substation Structures
43 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
10'-6
"
14'-0"12'-0"
7'-6"
11'-0"11'-0"15'-0" 12'-0 "
ST7
17'-2"
8'-1
0"8'
-10"
8'-1
0"8'
-10"
7'-0
"7'
-0"
7'-0" 7'-0"
12'-0
"16
'-0"
16'-0
"12
'-0"
7'-0
"7'
-0"
2'-6
"2'
-6"
69C8B
69C8
C8
C9
20MVARCAP BANK 2
20MVARCAP BANK 1
2A
B13" AL.S.P.S.
E1E4S3
B2795 KCMIL
ACSR
S1
F6
S2S1
E2
S2
S2
S1
E2
E3
E3
E6
E6
S1
B13" AL.S.P.S.
S
S
S
S
S
S
S
S
S
F F F
S S S
S S S
(35')
(35')
(35')
(34')
(34')
(34')
(27')
(27')
(27')
(32'
)
(25'
)
(25'
)
(25'
)
E
E
E(3')
B1
F6
C∅
B∅
A∅
A∅B∅C∅
A∅B∅C∅
C∅
B∅
A∅
2A
NEW LIGHTNINGMAST
LOW BUS
HIGH
BUS
LOWBUS
AAAA
BBBB
CC
CCE-83-40SHEET 8
E-83-40SHEET 8
S
F
F
F
F
F
F
21'-0" 21'-0"
S1S1 S1
C∅
B∅
A∅
C∅
B∅
A∅
C8F
C9F
2A
F6
F2
S
S
B2
B2
E7
E7
E7
B2
B2
E7
HOLD
(32'
)
(32'
) E-83-40SHEET 8
7#8 ALUMOWELD
7#8 ALUMOWELD
FORRECORD
FORRECORD
CONST.NOTE 1
HOLD
HOLD
PALOMINOSubstation
City Water, LightAnd Power
M.M.
86E83-40
E-83-40 SH6.DWG
4-84
PLAN VIEW
3/32" = 1'-0"
138/69-69/12.5KVSUBSTATION
Y.T.
1 07/84 M.M. - - -REV PER CUST. APPROVALS
2 XX/XX/20 BHMG - - -CAP BANK ADDITION
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
-
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
-2-
2A 07/28/20 ISSUED FOR REVIEW2B 09/17/20 ISSUED FOR REVIEW2C ISSUED FOR REVIEW10/30/202D 12/07/20 ISSUED FOR BID
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:BUS DAMPER
(XX') BUS SECTION LENGTH'F' DENOTES FIXED TYPE FITTING'S' DENOTES SLIP TYPE FITTING'E' DENOTES EXPANSION TYPE FITTING
XX DENOTES BILL OF MATERIAL ITEM, DWG PALO-91.1
CONSTRUCTION NOTE:1. FIELD TO REMOVE EXPANSION FITTINGS ON EXISTING BUS AT
CIRCUIT SWITCHER. COUPLE ON NEW BUS TO EXTEND TO NEWSWITCH PADS. BUS LENGTH MAY VARY, FIELD MAY CUT EXISTING BUSBACK AS REQUIRED TO INSTALL UNIFORM BUS LENGTHS.
2A
REFERENCES:SECTION VIEWS_ _ _ _ _ _ _ _ _ _E83-40 SH7SECTION VIEWS_ _ _ _ _ _ _ _ _ _E83-40 SH8SITE PLAN_ _ _ _ _ _ _ _ _ _ _ _ _ A-1647A
UE21-01-56 Outdoor Galvanized Steel Substation Structures
44 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
A
CONT. ONE-83-40 SH8
7'-0"
PALOMINOSubstation
City Water, LightAnd Power
-
X7E83-40
E83-40 SH7
XX/XX/XXXX
SECTION VIEWS
1" = 10'-0"
138/69KV - 69/12.5KVSUBSTATION
1 07/84 M.M. - - -REV PER CUST. APPROVALS
2 XX/XX/20 BHMG - - --
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
- --
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
-1-
1A 07/28/20 ISSUED FOR REVIEW1B 09/16/20 ISSUED FOR REVIEW1C ISSUED FOR REVIEW10/30/201D 12/07/20 ISSUED FOR BID
PRELIMINARY
NOT FOR CONSTRUCTION
1A
REFERENCES:PLAN VIEW_ _ _ _ _ _ _ _ _ _ _E83-40 SH6SECTION VIEWS_ _ _ _ _ _ _ _ E83-40 SH8
1A
UE21-01-56 Outdoor Galvanized Steel Substation Structures
45 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
15'-0
"
9'-2"17'-2"14'-0"
3" AL SPS
S1
E5
B1F5
12'-0"12'-0"21'-0"11'-0"
15'-6
"
8'-0"
A
7'-0" 7'-0"
7'-0"
69C8B
69C8
20'-0
"
1'-6"
S1
E5
F5F6F8
S2
E5
F4
S1
E5
F5
E1
F1
F4F3
S3
E4F6
15'-0
"
14'-0"
3" AL SPS
E2S1
E5
B1
F5
12'-0"12'-0"
20'-0
"
S1
E5
F5F7
S2
E5
F4
20'-0
"
12'-0" 16'-0" 16'-0" 12'-0"
S2
E5
S1
B1
E5 F4F3
F4F3
S2
E5
F5
F7
S1
S2
F3
B1
E5 F4F3
F4F3
B2
F4F3
F3
B2
795 KCMILACSR
E S F
B1
S
(F.S.)
F8
3" AL SPS
B2
795 KCMILACSR
1'-6"
(F.S.)
S F
15'-0
"
F
3" AL SPS
(F.S.)
B2
795 KCMILACSR
F5
S
3" AL SPS
B2
795 KCMILACSR
(F.S.)
F5F7
E5
1'-6"
E6
F4F3
B2
795 KCMILACSR
20 MVARCAP BANK 1
11'-0" 21'-0"
F2CONSTNOTE 1
S
F4
F3
E2
S
S1
E5
BOTT. OF STL.
F9 F9
F7
F5F10
F7
F3
F3F3
F10F7
F3F3 F10
E-TRIP
E3
9'-2"17'-2"
E6
B2
795 KCMILACSR
20 MVARCAP BANK 2F3
E3E7
BOTT. OF STL.
F3F11
E7
69KV PT(B∅ ONLY)(TYP.)
(TYP.) 69KV PT(B∅ ONLY)
(TYP.)
PALOMINOSubstation
City Water, LightAnd Power
M.M.
88E83-40
E-83-40 SH8.DWG
4-84
SECTION VIEWS
3/16" = 1'-0"
138/69-69/12.5KVSUBSTATION
Y.T.
1 07/84 M.M. - - -REV PER CUST. APPROVALS
2 XX/XX/20 BHMG - - -CAP BANK ADDITION
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
-
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
2
2A 07/28/20 ISSUED FOR REVIEW2B 09/17/20 ISSUED FOR REVIEW2C ISSUED FOR REVIEW10/30/202D 12/07/20 ISSUED FOR BID
PRELIMINARY
NOT FOR CONSTRUCTION
SECTION "AA-AA"
CONSTRUCTION NOTE:1. FIELD TO REMOVE EXPANSION FITTINGS ON EXISTING BUS AT
CIRCUIT SWITCHER. COUPLE ON NEW BUS TO EXTEND TO NEWSWITCH PADS. BUS LENGTH MAY VARY, FIELD MAY CUT EXISTING BUSBACK AS REQUIRED TO INSTALL UNIFORM BUS LENGTHS.
SECTION "BB-BB" SECTION "CC-CC"
EXISTING
REFERENCES:PLAN VIEW_ _ _ _ _ _ _ _ _ _ _E83-40 SH6SECTION VIEWS_ _ _ _ _ _ _ _ E83-40 SH7BILL OF MATERIALS_ _ _ _ _ _ PALO-00001-001
UE21-01-56 Outdoor Galvanized Steel Substation Structures
46 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
20'-0
"
7'-0" 7'-0"
7'-0" 7'-0"
12'-1
1 2"
17'-2
3 8"
BOTT. OF BASE
15'-0
"
12'-2
3 8"
BOTT. OF BASE
7'-0" 7'-0"
3 58"30
"
30"
3 58"
3'-0
"
BOTT. OF BASE
15'-6
"
3'-0
"
3'-4
1 2"
4'-0"
3'-0
"
PALOMINOSubstation
City Water, LightAnd Power
JPO
11PALO-S-000001
PALO-S-000001 - STEEL DETAILS
09/08/20
STEEL DETAILS
1/2" = 1'-0"
138/69-69/12.5KVSUBSTATION
JFJ
1 09/08/20 BHMG - - -CAPACITOR BANK REPLACEMENT
- - -
- - - - - --
- - - - - --
- - - - - --
-
-
-
-
-
BHMG ENGINEERS INC.630 JEFFCO BOULEVARDARNOLD, MISSOURI 63010
TELE: (636) 296-8600WWW.BHMG.COM
THE REGISTRANT OF THE NEWLYAPPLIED SEAL, DATED ,ONLY ASSUMES RESPONSIBILITYFOR CHANGES AS INDICATED BY THEFOLLOWING REVISION(S) .
--/--/--
1
1A 09/17/20 ISSUED FOR REVIEW1B 10/30/20 ISSUED FOR REVIEW1C ISSUED FOR BID12/07/20- - -
PRELIMINARY
NOT FOR CONSTRUCTION
3 PHASE HIGH BUS SUPPORT
REFERENCES:PLAN VIEW_ _ _ _ _ _ _ _ _ _ _E83-40 SH6SECTION VIEWS_ _ _ _ _ _ _ _ E83-40 SH7 & SH8
3 PHASE LOW BUS SUPPORT 3 PHASE SWITCH STAND
JPO
- - - -
SWITCH OPERATOR PLATFORM
UE21-01-56 Outdoor Galvanized Steel Substation Structures
47 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
FOR TENDER PURPOSES ONLY
UE21-01-56 Outdoor Galvanized Steel Substation Structures
48 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
AVXVERTICAL BREAK
DISCONNECT SWITCH
MINDCORETECH.COM
15 TO 420kV / 1200 TO 6000A
SWITCH IN...TO THE FUTURE
UE21-01-56 Outdoor Galvanized Steel Substation Structures
49 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
MINDCORE TECHNOLOGIES AVX IS A HIGH
QUALITY VERTICAL DISCONNECT SWITCH
THAT'S BUILT TO LAST! DESIGNED TO UTILIZE
THE HIGH STRENGTH AND LIGHTWEIGHT
CHARACTERISTICS OF ALUMINUM ALLOYS, IT'S
VIRTUALLY MAINTENANCE FREE!
SWITCH IN...TO THE NEXT GENERATION
The AVX is built with high quality components including robust pivots, sealed with back-to-back taper roller bearings.
Designed to be braidless, the current carying path is exempt of any rotating points for maximum reliability.
THE MINDCORE "EDGE"
PRODUCTS FEATURES
15 TO 420KV / 1200 TO 6000A
ALUMINUM CURRENT CARRYING PARTS
SILVER TO SILVER SELF-WIPING CONTACTS
REVERSED LOOP DESIGN ON HINGE AND JAW
FULLY ADJUSTABLE BLADE OPENING UP TO 95˚
3 SETS OF NEMA TERMINAL PADS AT BOTH ENDS
IEEE 693 HIGH SEISMIC TESTED
IMPROVED KEARNEY DESIGN
THE BLADE TURNS TO A FULL 90˚ PROVIDING UNEQUALED ICE-BREAKING CAPABILITY.
Reversed loop copper fingers exert more pressure on the blade, ensuring efficient electrical contact.
Oilite bushing are used to allow worry-free operation for life duration.
Our switches are all designed with ease of installation in mind
UE21-01-56 Outdoor Galvanized Steel Substation Structures
50 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
TECHNICAL SPECIFICATIONS
2425 EDOUARD-MICHELIN | TERREBONNE | QUEBEC | CANADA | J6Y 4P2
+1 450.477.5959 | [email protected] Outdoor Galvanized Steel Substation Structures
51 of 63 January 19, 2021
INFORMATIONAL PURPOSES ONLY ADDENDUM #2
ACKNOWLEDGEMENT
ADDENDUM #1
Contract #UE21-01-57
138kV Substation Foundations
Each bidder shall acknowledge receipt of this Addendum by their signature below and shall
include a copy of this Addendum Acknowledgment Form at the end of Section III of the
REQUEST FOR PROPOSAL. Failure to do so will be sufficient cause to reject your bid.
CERTIFICATION BY BIDDER
The undersigned acknowledges receipt of this Addendum and certifies that the bid submitted is
in accordance with the information, instructions and stipulations set forth herein. The changes
identified in this addendum take precedence over anything to the contrary in the original
specifications or other addenda issued for this project. All other terms and conditions of the
original specifications and previous addenda remain in full force and effect.