MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/2006 Jabalpur, dated:30.06.2018 To As per distribution list Sub: Agenda of 64 th meeting of Operation and Coordination Committee of MP. The Agenda of 64 th meeting of the Operation and Coordination Committee of MP scheduled on 29 th June 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Transcript of Agenda of 64th OCCM of MP.pdf

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/2006 Jabalpur, dated:30.06.2018

To

As per distribution list

Sub: Agenda of 64th meeting of Operation and Coordination Committee of MP. …

The Agenda of 64th meeting of the Operation and Coordination Committee of MP

scheduled on 29th June 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has

been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

Agenda of 64th OCC of MP 1

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 63rd meeting of Operation & Coordination Committee of MP held on 26th APRIL 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/1825 Jabalpur dated 15.06.2018.

[OCC may confirm the minutes]

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS APRIL 2018 TO MAY 2018. 2.1. Frequency Particulars: During APRIL 2018 the system frequency was below 49.90 Hz for 12.80% of time against 22.52 % of time during MAY 2018. The system frequency was above 50.05 Hz for 7.63 % of time during APRIL 2018 against 7.42 % of time during MAY 2018. The system frequency was within the IEGC range of 49.90-50.05 Hz for 79.57 % of the time during APRIL 2018 against 70.06% of time during MAY 2018. The average monthly frequency was 49.98 Hz during month of APRIL 2018 and 49.95 Hz during month of MAY 2018. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of APRIL 2018 and MAY 2018 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

APR 2018 49.97 Hz 49.81 Hz 50.08 Hz 49.62 Hz 50.20 Hz MAY 2018 49.95 Hz 49.77 Hz 50.10 Hz 49.57 Hz 50.20 Hz

[Committee may like to note]

2.2 Operational Matters 2.2.1 Operational Discipline : System operated in terms of frequency profile for the months APRIL 2018

and MAY 2018 is as given below for discussion by the committee :

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50. 05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

No. of times frequency dipped below 49.20 Hz

APRIL 2018 12.08% 7.63% 79.57% 49.97 Hz 0

MAY 2018 22.52% 7.42% 70.06% 49.95 Hz 0

[Committee may like to note]

AGENDA FOR 64th MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 29th JUNE 2018 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL,

NAYAGAON, JABALPUR.

Agenda of 64th OCC of MP 2

2.2.2 Voltage Profile: During the months APRIL 2018 and MAY 2018 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

APRIL 2018 MAY 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of Observed Observed Observed Observed Sr. 400 KV

Voltage Volt

No. Substation Voltage ag Voltage

Date Date Date Date KV e KV KV KV

1 Indore 420 25.04.18 401 02.04.18 419 06.05.18 397 31.05.18

2 Itarsi 419 29.04.18 402 09.04.18 419 06.05.18 400 14.05.18

3 Bina 415 29.04.18 397 15.04.18 416 06.05.18 396 04.05.18

4 Gwalior 416 19.04.18 389 21.04.18 417 16.05.18 389 01.05.18

5 Nagda 425 14.04.18 400 02.04.18 419 06.05.18 396 31.05.18

6 Satpura 423 23.04.18 406 04.04.18 421 01.05.18 407 21.05.18

7 Birsinghpur 420 29.04.18 405 13.04.18 424 16.05.18 406 14.05.18

8 ISP 426 24.04.18 409 04.04.18 426 06.05.18 405 31.05.18

9 Bhopal 415 29.04.18 396 28.04.18 415 06.05.18 395 24.05.18

10 Ashta 421 29.04.18 402 09.04.18 421 06.05.18 396 22.05.18

11 Pithampur 420 25.04.18 404 02.04.18 420 06.05.18 401 31.05.18

12 Singhaji 423 07.04.18 411 03.04.18 422 02.05.18 407 31.05.18 [Committee may please note & discuss]

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2018 as submitted by DISCOMs is detailed below:

[Action: MPPTCL, DISCOMS]

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVAR

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 412 142 38 20 12 1 17 5 0 25 - - - - - -

CZ 5 688 780 - - - 1 0 0 3 0 0 0 0 0 0

WZ 637 551 701 5 6 6 15 11 16 148 2 8 - - - 3

Agenda of 64th OCC of MP 3

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.05.2018 as submitted by MPPTCL is given below:-

[Action: MPPTCL]

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to MAY 2018) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

[Action: MPPTCL]

2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during APRIL 2018 and MAY 2018.

There was no df/dt operation during the same period. [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that All the df/dt and U/F relays are in operation,

where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & ABB make df/dt relay at 132KV S/S Chapda is being replaced shortly , except this all U/F stages are in good/ healthy working condition.

[Committee may like to note] 2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to

33 KV feeders:

(i) Details of DISCOM wise Power supply given to various domestic categories during the period

APRIL 2018 and MAY 2018 is enclosed at Annexure 2.3(i).

[Committee may like to note]

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of

33 KV feeders emanating from various newly commissioned/existing EHV substations for which

groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending

group allocation to 33 KV feeders is given below:-

Voltage Class

Capacitor bank installed as on

31.01.18(MVAR)

Capacity Added after Last OCC

Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 31.05.18

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 5104.50 0.00 - 5104.50 Total 6442.50 0.00 - 6442.50

Agenda of 64th OCC of MP 4

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01

EAST

Jabalpur 0 02 Sagar 0 03 Rewa 1 04 Total 1 05

WEST Indore 08

06 Ujjain 02 07 Total 10 08

CENTRAL Bhopal 18

09 Gwalior 19 10 Total 37

TOTAL Grand Total 48

Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting. In view of the above it is requested that the order copy of the feeders which have been group allocated

shall be submitted to P&D, MPPTCL under intimation to SLDC. [ACTION : DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during JULY 2018 to AUGUST 18 as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur is as follows:- S.NO UNIT FROM DATE TO DATE REASON

1. SATPURA # 10 28.06.2018 31.07.2018 C.O.H 2. AMARKANTAK # 5 01.07.2018 28.07.2018 A.O.H 3. SGTPS # 4 01.07.2018 30.07.2018 C.O.H 4. SATPURA # 8 15.07.2018 20.07.2018 A.O.H 5. SATPURA # 7 01.08.2018 25.08.2018 A.O.H 6. SGTPS # 2 01.08.2018 15.08.2018 A.O.H 7. SSTPS # 1 10.08.2018 24.08.2018 A.O.H 8. SSTPS # 2 10.08.2018 16.08.2018 A.O.H 9. SGTPS # 1 26.08.2018 15.09.2018 A.O.H

[Committee May like to note]

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.06.2018 to 31.07.2018 submitted by MPPTCL is enclosed as Annexure-3.2.

[Committee May like to discuss]

Agenda of 64th OCC of MP 5

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 40 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 220kv s/s Ujjain.

22.06.2017 Tripped on differential indication.

Transformer has been declared failed and being replaced by 20 MVA X’mer. MPPTCL informed that the X’mer will be replaced by 15th July 2018. Latest status may please be submitted by MPPTCL in the meeting.

2. 40MVA, 132/33KV, BBL X’mer at 132 KV S/s Betma.

- -

Transformer taken out of service and sent to works of M/s BBL, for inspection and checking due to high content of key gases. Another 40MVA BBL transformer commissioned in place of defective transformer on Dt. 21-05-18. Latest status may please be submitted by MPPTCL in the meeting.

3. 315MVA, 400/220,BHEL X’mer-I at 400kv S/s Bina 15.01.2018 Differential, Buchholz

and PRV indications MPPTCL informed that X’mer charged on 02.05.2018.

4 315MVA, 400/220 X’mer-II at 400kv S/s Bina. 14.02.2018 Differential, Buchholz.

MPPTCL informed the committee that another X’mer will be available by end of July-2018.

5 40MVA 132/33KV ECE at 132 KV S/s Lakhnadon.

24.02.2018 Tripped on Differential indications

MPPTCL informed the committee that the X’mer replaced by 16 MVA X’mer on 14.06.2018.

6 STPS Unit #9-GT 24.08.2017 GT Burnt

MPPGCL informed that Unit synchronized on Dated 01.05.2018.

7 UAT-B, U#11, STPS, Sarni FEB-18 -

MPPGCL informed that UAT taken on service on 27.05.18

8. 500 MVA, 400/220 KV X’mer at STPS. 19.04.2018

X’mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from

21.04.18 to 05.05.18 for CPRI oil filtering and

RLA testing work.

MPPGCL informed that Owing to adverse report of RLA conducted on ICT during shutdown, proposal for permanent discontinuation of ICT from service has been submitted.

Agenda of 64th OCC of MP 6

9 400 KV Transfer Bus Coupler at SGTPS 13.12.17 Nitrogen Leakage

MPPGCL is requested to indicate the reason for not indicating the outage timely to SLDC. Latest status may also be intimated by MPPGCL in the meeting.

10. Line Reactor at 400KV Sarni-Asta Line

Make GE 50 MVAR

Out from 31.03.18 due to Acetylene gas contain

is on higher side i.e 70 PPM

Estimate approved for rectification work and tender will be float shortly.

Any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The utility may submit the latest status.

[Action:MPPGCL/MPPTCL] ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF APRIL 2018 AND MAY 2018: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

[Committee may like to note] ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF APRIL 2018 AND MAY 2018: The Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

[Committee May like to discuss] ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Bus Reactor : ISP 125 MVAR NHDC

In 63rd from ISP informed the committee that the reactor has been installed and the inspection by the engineer from CEA has been done, the report of which is still awaited. Hence it is expected that the reactor will be taken in service by end of May 2018. Latest status may please be submitted by NHDC in the meeting.

Agenda of 64th OCC of MP 7

2. Line Reactor on 400 kV Satpura–ISP line at STPS

50 MVAR MPPGCL

MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by December 2018. Latest status may please be submitted by MPPGCL in the meeting.

3. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCLin 62nd OCC MPPGCL informed the committee that the reactor is under procurement and will be commissioned by December 2018. Latest status may please be submitted by MPPGCL in the meeting.

The latest status may be submitted in the meeting.

[Action: MPPGCL/NHDC]

6.2 Load Dropping Scheme/ System Protection Schems (SPS) at substations in M.P to handle emergency condition: - In 63rd OCC, MPPTCL was requested to review the existing load drop scheme

(SPS) and to implement new load drop scheme as per requirement as per undated network and submit to

SLDC. Further it is to intimate that WRLDC wide e-mail dtd-18.06.2018 has also requested to submit the

updated load trimming schemes details, SPS implemented in MP system. In view of the above it is requested that the complete details of all SPS commissioned in MP by

MPPTCL along with load shed quantum, may be submitted to SLDC so that the copy of the same could be

placed in Control room of SLDC and concerned substation / power station for reference & record and the

same can also be submitted to WRLDC.

The Committee may discuss the matter.

[Action: MPPTCL]

6.3 Providing the region-wise-District wise details of quantum of solar roof top installed in MP system :-Ministry of New & Renewable Energy, Govt. of India is implementing grid connected roof top

power programme. As a sequel to above roof top power plant have been installed in government building as

well as other prominent buildings. Presently the amount of roof top generation is not available with SLDC. It

is felt that the installed capacity of solar roof top plant, be considered for modeling of power system network

in PSS system. It is intimated that now a days PSS software are being used for study purpose of power

system network for future planning and operation of grid. It is therefore desired that region-wise-District wise quantum of grid connected solar roof top plant

(Region-wise) installed in your Discom may please be provided to SLDC so that the above quantum of

solar roof top installed in the system may be accounted for and updated in PSS power system network.

Monthly region-wise-District wise updation of roof top solar, in each Discom jurisdiction may also be

provided regularly to SLDC in the first week of every month, for keeping the PSS update.

The management has desired that the compliance on the above matter may please be adhered to. The

Committee may discuss the matter.

[Action: DISCOM’S]

Agenda of 64th OCC of MP 8

6.4 One Hour 20 minutes interruption to 220 KV substation Shahdol on dtd 01.06.2018 and non-reporting thereof: - At 16:53 hrs on dtd 01.06.2018, AE 220 KV substation Shahdol had forwarded

shutdown proposal on 40 MVA 132/33 KV transformer to attend hot point on 33 KV main bus R-phase

isolator jaw. Subsequently it is gathered that 40 MVA 132/33 KV transformer had already been hand tripped

at 16:30 hrs without obtaining code from SLDC. The Executive Engineer (Testing) MPPTCL Shahdol was

requested to furnish the details of incidence took place. However, Shahdol substation was trying to hide the

facts and 40 MVA transformer was charged without obtaining code from SLDC. Thereafter at late night

hours it was gathered that 20 MVA 132/33 KV transformer at 220 KV substation Shahdol was also hand

tripped at 16:30 hrs (01.06.2018) along with 40 MVA transformer. Therefore, this caused one hours 10

minutes interruption to Shahdol substation. Nevertheless, long duration interruption to Commissionary Head

Quarter is not desirable, moreover the facts were concealed. It may please be noted that keeping the EHV elements out of service without permission of SLDC is

violation of grid code. Obviously, the EHV Elements could be hand tripped without obtaining code from

SLDC in case of exigency but it should be informed immediately to SLDC and Elements should have

charged after obtaining code from SLDC. It is observed that EE (Testing) Shahdol is intended to indulge in

disputes rather than addressing the real issue. The Matter may kindly be investigated and suitable action in

the matter may please be taken so that reoccurrence of such incidence do not repeated in future. If such

incidence repeated in future the same shall be reported to MPERC in monthly report as per provision of grid

code. The detailed report of prolonged interruption to 220 KV substation Shahdol still have not been

provided to SLDC so far in spite of request already made in this regard. The Committee may discuss the

matter.

[Action: MPPTCL]

6.5 Abnormal delay in normalization of transmission elements after tripping at Sarni TPS:- 400 KV Astha-Sarni line tripped at 14:50 hrs on 09.06.2018 from both end with following indication:-

Astha – B Ph. Zone-1, Location- 77.4 KM

Sarni – B Ph. Zone-1, Location – 16.08 KM

The line could be normalized at 16:05 hrs on 09.06.2018 after 01 hour 15 minutes of tripping. It may

please be seen that abnormal delay has been done for normalization of above line. In the above context, it

is to mention that it is generally observed that whenever any tripping took place at Sarni Power House,

abnormal delays were noticed for normalizing the lines, on plea of yard checking/ testing etc.

It is requested that the concerned officials may please be instructed that whenever any tripping or

disturbance occurred on EHV elements, the same should be conveyed with relay indications and all relevant

details to SLDC within reasonable time slot and system should be normalized promptly in due course of time

so that undesired delay in restoration of EHV elements could be avoided. The prolong outage of EHV

elements also involved commercial issues therefore it is desired to arrange to ensure timely restoration of

tripped EHV elements. The Committee may discuss the matter.

Agenda of 64th OCC of MP 9

[Action: MPPGCL]

6.6 Creation of GIS based Energy Map of India by NITI Aayog:- Director, CEA, New Delhi letter o.

07/02/ceA/pfam/Niti Aayog/2018 dtd. 09.02.2018 (copy enclosed), addressed to CMDs/MDs/Chairperson of

Discoms / Power Utilities, has requested to provide data pertaining to power utilities in attached format

(Annexure-6.6) for development of Geospatial Energy Map of India. Accordingly, it has been requested to

provide soft copy of these data to email Id- [email protected].

In the above context, it is to mention that Niti Aayog is developing a user friendly GIS based Energy Map

of India which would provide true locations of energy resources in India including Power Plant, coal, and oil

reserves, transmission lines, refineries etc. The CEA is nodal agency to collect all data pertaining to the

power sector of India by collecting it from different utilities of power factor.

In view of above, it is requested that consolidated information pertaining to your Company in prescribed

format may please be made available in soft copy to CEA, New Delhi under intimation to this office. The

above data may be emailed to mail Id - [email protected]. The Committee may discuss the matter.

[Action: MPPTCL/MPPGCL/DISCOMS/NHDC/JPBINA/BLA/All State Entities]

6.7 Procedure for availing outage on ISTS EHV elements and OCC approval thereof:- As per

standard procedure of WRPC, all EHV elements which have been listed under the list of important grid

elements of Western Region, the outages for such elements required OCCM approval. All such proposed

outages of interstate and 400 KV transmission elements of next months should be got approved in the

OCCM of WRPC in the current month. All the constituents of WR shall inform to the WRPC for readiness for

availing outage of transmission elements on D-3 basis. Further, as decided non-OCCM outages should be

discouraged. Only under exceptional cases, the request for transmission outage after issue of OCCM

minutes must be posted through email for concurrence of WRPC Member at least three days in advance. It

has been seen that Occam outage proposal which are being submitted and got approved, however the same

are not being availed in real time. It is also observed that the occm proposal are being submitted very casual

manner without accentuating actual requirement, moreover the proposal of a few lines is being submitted

regularly in repeated pattern but the outage on the same are not being availed. Where as it is always tried to

get approval of non occm outage, which unnecessarily creates disputes with WRLDC/WRPC. It is therefore

required that actual requirement of shutdown on EHV Elements may be be planned and accordingly outage

proposal be submitted to SLDC for approval of OCCM. The work related with construction activities / shifting

work, new addition etc. invariably incorporated in OCCM proposal. In the above context EHT Construction is

requested to arrange to send their OCCM outage proposal through CE ( T &C ) within stipulated time as from

EHT Construction , OCCM proposal never being received in accordance with laid down procedure they

generally insisted upon non OCCM outage approval just before targeted date.

Agenda of 64th OCC of MP 10

The matter has also been discussed in various OCC meetings of MP and it is observed that the

standard procedure for availing outages on interstate and 400 KV elements is not followed by the utilities. It

is observed that routine maintenance shutdown proposal and the shutdown proposal of construction

activities are being sent to SLDC on D-3 basis, whereas such proposal should have been incorporated in

OCCM proposal. Such practice should be strictly avoided. It is worthwhile to mention here that WRPC

/WRLDC are reluctant to entertain non-OCCM outages for maintenance / construction activities. Only

emergency outages are considered on D-3 basis. It is therefore desired that all utilities may please ensure

that all maintenance/ construction activities may be planned well in advance and such proposal should have

invariably incorporated in OCCM proposal. It is also mentioned that due to any reason if any OCC approved

outage could not be availed, in that case such proposed outages could be rescheduled in the same month

and approval of WRPC/WRLDC could be obtained. However, no any outages could be considered which

has not been incorporated in OCCM proposal. The aforesaid instruction may kindly be complied by Eht-

Const wing also as WRLDC/WRPC is reluctant to accord approval on D-3 basis for construction activities.

The Committee may discuss the matter.

[Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA/All State Entities]

6.8 Delay In Submission of Documents For First Time Charging of Elements:- Procedure for

interconnection of new transmission elements is briefly narrated hereunder:- • Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date

of first time charging.

• Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days.

• Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days

prior to anticipated date of first time charging.

• RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of

interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line

charging approval shall be conveyed by SLDC: (within 2 days).

• Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to

read the SEM data from the new meters.

• Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code

shall be issued keeping view of grid reliability.

• Transmission Licensee submit Post Charging documents (Annexure C1 to C4).

• RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional

lines / ISTS lines.

• The respective testing department shall furnish regarding measures taken to take care new element

interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be

provided.

It is requested that licensee / utilities shall strictly adhere with time schedule for documentation of first

time charging of new transmission elements of all interstate line and all EHV elements 400kv and above. It

may also be ensured that FTC formalities should have completed before availing outage for integration of

Agenda of 64th OCC of MP 11

element. The authority submitted FTC document should ensure compliance of protection/ metering issue in

coordination with T&C official. It is also desired that all necessary data should have made available to all

adjacent s/s for relay coordination well before targeted date. The authority submitted FTC document should

ensure all formalities have been completed otherwise clearance from WRLDC shall not be obtained.In

generally seen that partially filled up FTC documents ,non attachment of requisite papers/ SLD/ document

of standing committee approval /approval of Electrical inspector /noncompliance of relay coordination of

adjacent s/s / providing information incorrectly caused delay in obtaining FTC approval.

[Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA/All State Entities]

6.9 Reporting Of Flash Report, DR and EL of Transmission Elements & Detailed Tripping Report:- As per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code) Regulations

2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment) Regulations, 2012

all the Regional Entities of the Region shall furnish the tripping details including DR & SEL output to RLDC

with in 24 hrs of the event for analysis and identify the real time measures required in future to ensure

secured grid operation. The flash report is also required to be furnished to SLDC within an hour of tripping.

It is observed that FLASH REPORT, DR & EL of station is not made available after tripping of transmission

grid element by the State Grid Entities and the flash report is also not being sent after repeated pursuation. It is also to inform that in the 508th WRPC OCCM , WRLDC also marked some events for which

the above details are not provided, which are also required to be provided in WR PCM, the events are as

below:-

S no Event at Event date Status 1 220KV s/s

BARWAHA 03.05.18 DR/EL not provided

2 220KV s/s SIDHI 12.05.18 DR/EL not provided

3 JP BINA & BINA MPPTCL 13.05.18

Detailed tripping report and DR/EL not

provided

4 OSP NHDC 26.05.18 DR/EL not provided in .dat & .cfg format

All intra-state entities are requested to submit the FIR, DR & EL of station during tripping of transmission grid elements.

[Action: MPPTCL/MPPGCL/IPPs/NHDC/ISP/OSP]

6.10 Ten Daily Reservoir operation table of MPPGCL HPS:- In the meeting held in Regional Office

of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State

Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and

NVDA for their operation of their hydro generators. In last 54th , 55th & 56th OCCM, request has been made to

MPPGCL for furnishing the same to SLDC within a week,

Agenda of 64th OCC of MP 12

In last meeting MPPGCL has submitted the Ten Daily Reservoir Table of Bargi and Bansagar Hydel Power

Stations. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of remaining hydel power

stations in coordination with NVDA and WRD for optimum utilisation of available water in the reservoirs during

the summer season.

[Action: MPPGCL]

6.11 CONTROLLING HIGH VOLTAGE DURING OFF-PEAK HOURS :- Switchable Shunt Reactors

are being taken in service during high voltage conditions. However in view of inadequate shunt reactive

compensation, the generating units are advised to contribute in voltage regulation by operating their units in

under-excited mode (absorb Reactive Power) within the capability curve. The MW, MVAR and Voltage of

generating units was analyzed for the month of Feb 2017 with the help of SCADA data available at WRLDC. In 494th OCC meeting of WRPC, WRLDC has drawn attention regarding MVAR generation at Satpura

Power Station when bus voltage was above nominal. The scatter plot of MW Vs MVAR of unit and Bus Voltage

Vs Reactive Power Injection by the unit has been plotted. It has been observed that generating unit at Satpura

Unit No. 10 & 11 was injecting reactive power into the grid even when the bus voltage was above nominal. Such

operation is not desirable and it is requested that AVR setting and the GT taps may be reviewed / adjusted so as

to enable the unit to contribute in voltage regulation within the capability curve. The directives in this regard may

please be adhered to control the high voltage during off peak hours.

[Action: MPPGCL/NHDC/IPPs]

6.12 MONITORING OF SCHEMES FUNDED FROM PSDF :- It was decided in the 6th meeting of NPC

held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with

the utilities to expedite the completion of schemes by giving due priority. The implementation of most of the

schemes are based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed

by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and

reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is enclosed at

Annexure- 6.12A. The status of implementation of above schemes (physical as well as financial progress) may

please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities were

advised to furnish the information in the format enclosed at Annexure – 6.12B by first week of every month on

regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a copy to

NPC, WRPC division and SLDC. The status of the same is being monitored by WRPC in OCC meeting of

WRPC every month. The information from MPPTCL and MPPGCL is not being received regularly to SLDC i.e first week of every

month for submission the same in OCC meeting of WRPC.

[Action: MPPGCL/MPPTCL] 6.13 POWER SYSTEM STABILIZER (PSS) IN AVR TUNING OF GENERATOR AND ITS RESPONSE PLOT:- In 129th Protection Committee Meeting of WRPC, it has been decided that all generators

would furnish PSS settings and step-test response plot of time Vs terminal voltage in excel sheets to WRLDC/

Agenda of 64th OCC of MP 13

WRPC. As a sequel to above, MPSLDC vide various e-mail communication all generators under our periphery

were .requested to provide PSS settings and the step test response plot of time Vs terminal voltage in excel

sheet to WRLDC/ WRPC. Inspite of repeated pursuance, the details of SGTPS Birsinghpur Power House only

receipt, no any other generators have provided the desired information. However, SGTPS has also not provided

desired graph plot in excel sheet. The above data /plot required to be provided to WRLDC/ WRPC on urgent

basis, it is therefore desired that all generators may provide the same so that the same may be forwarded to

WRLDC/ WRPC. The OCC may discuss the matter and the compliance of Protection Committee Meeting may kindly be

ensured.

[Action: MPPGCL/NHDC]

6.14 RGMO/FGMO compliance by generators in the region:- It is to intimated that as per IEGC

5.2(f), RGMO/FGMO is mandatory for all thermal Units above 200MW & Hydro Units above 10MW for grid

security and reliable grid operation. Further vide 5th amendment to IEGC dtd-12.04.2017, it has been provided

in clause-5.2(h) that “ RLDCs/SLDCs shall not schedule the generating station or unit(s) thereof beyond ex-bus

generation corresponding to 100% of the installed capacity of the generating station or unit(s) thereof and that

the generating station shall not resort to Valve Wide Open operation of units” so that primary response is

ensured. In view of the above it is requested to kindly submit the required details in prescribed format enclosed

as Annexure- 6.14 to SLDC at immediately. The required data has been received from MPPGCL.

[Action: NHDC/JP Bina/BLA]

6.15 ABNORMAL VOLTAGE VARIATION OBSERVED IN PMU AT 400 KV S/s BINA:- The

abnormal voltage variations is being observed in PMU’s at 400 KV S/s Bina (plots enclosed as Annexure-6.15 (3 pages) since May 2018. SLDC has taken up the matter with T&C, MPPTCL and M/s GE. M/s GE engineer visit was arranged to 400 KV S/s Bina to investigate the problem in PMUs & it has

been informed by GE site engineer that the voltage spikes are also observed in the input values of PMU from

Bus PT’s & line CVT secondary, hence it can be gathered that these PMU’s are showing correct values and

there is no issue in PMU.

Further it is also to intimate that the abnormal voltage spikes are still being observed in the PMU of 400

KV Main Bus I & II and 400 KV Bina(M.P) – JP BinaCkt installed at 400 KV S/s Bina and the magnitude

&frequency of spikes is continuously increasing with time .In addition to above, it is to also intimate that the

voltage spikes are observed in 400 KV Bina-JP BinaCkt even when the line is hand-tripped from both ends.

In view of the above MPPTCL is thus requested to kindly arrange for testing of Bus PT’s, line CVT &

related equipments installed at 400 KV S/s Bina for investigation of root cause of these voltage spikes observed,

for its rectification and ensure healthiness of equipments at site. Further it is also requested to intimate SLDC

about the necessary action plan at the earliest.

[Action: MPPTCL]

Agenda of 64th OCC of MP 14

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During 2017-18 the black start mock drill successfully

carried out at Bargi and Pench Hydel power station on dtd 23.05.2017 and 06.06.2017 respectively. The Black

Start Mock drill exercise at Gandhi Sagar Power station was also carried out on dtd 30.05.2017 but

synchronization of islanded system with national grid was not successfully done due to problem in bus coupler

breaker at Gandhi Sagar Power Station. Black Start Mock Drill at Birsinghpur HPS, Tons HPS & ISP HPS was

successfully carried out on 17.10.2017, 23.01.2018 & 10.02.2018 respectively. The Joint Black Start Mock Drill

of Pench & Bargi was successfully conducted on 11.04.2018. MPPGCL may apprise the same in the meeting.

The black start mock drill exercise of OSP was to be held in April 2018 but due to non-availability of Bus

Coupler Breaker at OSP the Mock Drill date cannot be finalized. In 63rd OCC OSP informed the committee that

the purchase of Bus Coupler Breaker is under process and the tender is being awarded.

In view of the above OSP HPS may kindly inform the latest status of Bus Coupler Breaker so that at the

earliest Mock Drill exercise may be organized.

It is proposed to conduct the Black Start Mock Drill at Gandhi Sagar HPS on 06.07.2018. MPPGCL may

confirm the same in the meeting.

[Action : MPPGCL/NHDC] ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 Status of AMR system installed at SLDC:

In the month of May 2018, the complete data of 591 meters was received through AMR system and data of 33 Nos meters (Monthly- 25 & Partial -08) was not received through AMR system. M/s Secure Meters Ltd. have been adviced to examine the reasons of 33 Nos. meters not read during the month. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. The Committee may like to discuss the following as an action plan for receiving the complete data through AMR system in in a time bound manner.

1. CE(T&C) office is requested to take up the matter with M/s Secure Meters Ltd for resolving the

site related issues of the 33 Nos meters not read during the month of May 2018. Details are shown in enclosed Annexure-8.1.i.

2. Around 145 Nos. ABT meters are installed at the interface points of newly commissioned

substation / Xmers / HT consumers / OACs. After repeated pursuance with M/s Secure Meters Ltd. 79 Nos meters are successfully integrated with AMR system of SLDC and balance 66 Nos meters are yet to be integrated with AMR system. CE(T&C) office is requested to advice M/s Secure Meters Ltd. and field offices for integrating the balance ABT meters (66 Nos). The list of 66 Nos. meters required to be integrated with AMR system is shown in Annexure-8.1.ii.

SLDC is repeatedly requesting CE(T&C) office to take up the matter with CE(Procurement) office for including the new meters installed at the interface points under AMC contract of M/s Secure Meters Ltd. so that complete data availability is ensured.

Agenda of 64th OCC of MP 15

3. SLDC has already requested CE(T&C) office in 63rd OCCM to issue instructions to site officials

for testing / calibration of meters installed at the Sub-Stations as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010. CE(T&C) office is requested to apprise the status of testing / calibration of interface meters to Committee.

4. CE(T&C) office was already requested in 63rd OCCM to issue instructions to all circle offices for

furnishing the JMR data in standard format enclosed herewith as Annexure-8.1.iii to SLDC on email id- [email protected]. However, JMR data is still not being received in required format. CE(T&C) office is again requested to issue instructions to circle offices for furnishing the data in standard format.

[Action : CE(T&C) MPPTCL] 8.2 Non receipt of meter data timely of ABT meters installed at the Railway TSS:

The monthly meter data of ABT meters installed at the Railway TSS is downloaded through AMR system installed at SLDC. In case of non-availability of meter data through AMR System, SLDC intimates the missing data list to concerned T&C circle office and coordinate with field offices for manual data downloading through MRI of the ABT meters installed at TSS. But, every month difficulty is being faced by field officials in manual downloading of data through MRI as proper cooperation and support is not provided by the Railways as a result the data gets delayed. Railway is requested to issue instructions to their concerned officials for proper coordination with MPPTCL officials for data downloading of ABT meters installed at TSS. [Action : Railway]

8.3 AMR facility for the ABT meters installed at MPPGCL : In compliance to state commission directives for computation of weekly transmission losses and

Deviation charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal), O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The status of May 2018 of ABT meter data (38 Nos) not received through AMR system of SLDC has been emailed to GCC, MPPGCL on 19th June-2018. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully and provide AMC of AMR facility installed at Power Houses to M/s Secure Meters Ltd so that complete data of meters is received at SLDC. MPPGCL is also requested to instruct the Gandhi Sagar HPS & Silpara HPS officials for considering the ABT meters with AMR facility as main meters and shall furnish the JMR data accordingly.

MPPGCL is requested to furnish the meter master of ABT meters installed at the interface points

as main, check and standy meters alongwith modem and SIM details. In case of Thermal Power Stations of MPPGCL, the injection recorded by the ABT meters

installed at the outgoing feeders generally do not match with the generation recorded at Generator end. MPPGCL is requested to advise the site officials for monthly checking / verification of feeder wise data with Generator and Station Xmer wise data and testing / calibration of meters installed at the Power Stations as per CEA regulations.

Agenda of 64th OCC of MP 16

At Satpura TPS, the ABT meters installed at Generator no. 6&7 (MPC63019,MPC63023) and at Station Xmer No. 3&4 (MPC63022,MPC63024) are having time drift as such data of these meters are not being utilized by SLDC. MPPGCL is requested to issue instructions to concerned officials at Sarni TPS for time synchronization through GPS of these meters.

[Action : MPPGCL ]

8.4 Non receipt of monthly injection data (JMR) of newly commissioned Wind & Solar Power Project for issuance of monthly State Energy Account :

The concerned SE(O&M)’s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done. i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. (Simcom(1MW), Eastman(4MW) &

Made Easy(10MW) connected at 220KV Ganjbasoda. –SE(O&M) Vidisha. ii) 6MW Biomass Power Project M/s Ramnik Power & Alloy connected at 33KV Wara Seoni

substation - SE(O&M) Chhindwara. iii) 12.8MW Baggase Power Project of M/s Mahakaushal Sugar Mills connected at 220KV

Narsinghpur substation - SE(O&M) Narsinghpur. iv) 30MW Baggase Power Project of M/s Narmada Sugar Mills connected at 132KV Ponder

substation - SE(O&M) Narsinghpur.

DDC, Jabalpur and Bhopal is requested to take up the matter with their CE(Comml), office for issuance of directives to concerned SE(O&M)’s to furnish the JMR generation data by 3rd or 4th of every month.

Further, the JMR/AMR injection data of the following wind generators connected at 33KV level

is not furnished at the time of issue of provisional SEA by the concerned SE(O&M), Ujjain and Betul

i) 30MW Wind Power Project of M/s Sudheer Project Pvt. Ltd. connected at 132KV Maxi Substation. – SE(O&M) Ujjain

ii) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Ghosla substation. SE(O&M) Ujjain

iii) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Behrugarh. SE(O&M) Ujjain

iv) 29.4MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 132KV Khachrod substation. –SE(O&M) Ujjain

v) 28 MW Wind Power Project of M/s Inox Betul (Giriraj) connected at 132KV Gudgaon substation - SE(O&M) Betul DDC, Indore is requested to take up the matter with their CE(Comml), office for issuance of

directives to SE(O&M)’s Ujjain and Betul for furnishing the JMR generation data by 3rd or 4th of every month.

Further, the JMR injection data of the following wind & solar generators connected at 132KV

level and above is not furnished by the concerned EE(T), MPPTCL. SLDC consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data could not be done. i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV

Badnagar substation through 132KV Ckt.

Agenda of 64th OCC of MP 17

ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation through 132KV Ckt.

iii) 50 MW Kukru Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt.

iv) 49.5 MW Betul Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt.

CE(T&C) office is requested to issue necessary instructions to concerned filed offices for

furnishing the JMR data to SLDC by 3rd or 4th of every month.

[Action : DISCOMS & MPPTCL] 8.5 MPREC( Forecasting,Scheduling,Deviation Settlement Mechanism and related matters of Wind and Solar Generating Station) Regulations 2018:

Hon’able Madhya Pradesh Electricity Regulatory Commission has notified the MPERC

(Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations 2018 on 20th April 2018. These regulations have come in force from the date of notification of regulations. The regulations are applicable to all Wind Generators having a combined installed capacity of 10MW and above and Solar Generators with an installed capacity of 5 MW and above including those connected via pooling statins and selling power within or outside the State.

In accordance with regulatory provisions, SLDC has to compute the deviation charges of

qualified Wind and Solar Generating Stations on the basis of Schedules issued by SLDC and actual injection recorded in ABT meters installed at the pooling stations. The actual generation data of Wind and Solar Generators connected at 132KV level and above is received by SLDC through AMR system. However, complete meter data of Wind and Solar Generators connected at 33KV level is not received by SLDC through AMR system. SLDC has already issued instructions to Wind and Solar Generators not integrated with AMR server of SLDC and connected at 33KV level for providing separate modem, antenna, Optical cable & SIM for data downloading at SLDC remotely. In order to implement the above regulations the data of actual generation data of Wind and Solar Generating Stations connected at 33KV level is essentially required by SLDC through AMR or manual downloading through MRI. SLDC has already requested the CE(Comml) West and Central vide letter no.07-05/FS_DSM/154/1899 dated 21.06.2018 and letter no. 07-05/FS_DSM/154/1903 dated 22.06.2018 for appointment of nodal officer for providing the meter details, AMR facility and meter data. DCC Indore and Bhopal is requested to take up the matter with their CE(Comml), office for providing the meter details , AMR facility and data to SLDC. .

. [Action : Discoms & MPPTCL]

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, Captive Power Plant & Railway Traction feeders is to be provided through

Agenda of 64th OCC of MP 18

Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. The integration of around Eight RTUs (132KV Biora, 132 KV Nainpur, 132 KV Mandla, 132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura, 132 KV Maneri, 132 KV Dabra ) is required to be integrated with SLDC SCADA system.

In addition to the above telemetry of Birsingpur HPS and Zinna HPS is also not

available and same needs to be provided by MPPGCL. In last OCCM, MPPGCL informed that the procurement of RTU is in approval stage, so the status of the same is required to be provided by MPPGCL.

MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and rectification of SOE issue may please be provided by T&C.

[Action: - CE (T&C)/CE (T&P), MPPTCL] 9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as annexure-1. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:- Sl

No. Name of Substation

whose RTU is required to be upgraded

Name of feeders/transformers required to be included in telemetry

01 400 KV Birsingpur TPS

1.Wrong telemetry of 400/220 KV Xmer CB status (Both Sides), Bus Coupler CB status, Station Xmer 5A & 5B CB status,Gen-1 CB status, 220 KV Panagar CB status, Gen-2 CB status,220 KV Shahdol CB status, 220 KV Amarkantak-2 CB status,220 KV Transfer Bus Coupler CB status. 2. Wrong values of 220 KV Bus-II Voltage & frequency, 400 KV Bus-1 Frequency. 3.Non availability of telemetry of 220/33 KV Xmer. These discrepancies are persisting since last 1 year.

02 400 KV Satpura TPS

Telemetered values of 1.Generating Transformer 6,7,8,9 MW,MVAR, 2.400 Satpura-Astha I & II Line Reactors, 3. 220 KV Bus I & II Voltage & frequency, 4.CB Status of complete 220 KV yard 5.SOE to be verified. 6. Station Xmer-3 MW,MVAR These discrepancies are persisting since last 1 year.

03 220 KV ATPS 1. Station Transformer 5A CB & 132/33 KV transformer CB, 220/132 KV 63 MVA Xmer CB. 2. 220 KV Bus-1 Voltage & Frequency.

Agenda of 64th OCC of MP 19

04

220 KV Tons

Telemetered values of following feeders is wrong:- 1. 220 KV Tons-Sirmour 2. 220 KV Tons-Rewa 3. 220 KV Tons-Satna 4. 220 KV Tons-Kotar

Above discrepancy is pending since more than year. In Last OCCM it was ensured by MPPGCL that the same shall be rectified within a week but no action has been taken till now. CB status of 220 KV Tons-Rewa II, Gen-1 & 220 KV Tons-Kotar-1

05 Rajghat HPS Wrong CB status of Gen-2 & 3

06 400 KV ISP 1,Telemetered values of 400 KV Nagda MVAR is 10 times of actual value. 2. Telemetred values of 400 KV Bus-1,2 Voltage & Frequency, 400 KV Indore-1& 2 MVAR.

07 220KV Birsingpur S/s

CB status of 220 KV I/C II, 220 KV Traction-1

08 132KV Kotma S/s 1.132KV Anuppur feeder II telemetry not available. 2. Wrong CB status of 132 KV Anuppur-1 & 2.

09 220 KV Seoni i.Wrong CB status of 160 MVA Xmer II (Secondary side) ii.Wrong value of 220 KV Bus II Voltage iii. Wrong value of 220 KV Seoni-Seoni(PG)-1 & 2

10 400 KV Bhopal 80 MVAR Reactor I Main CB , 400 KV Bina-2 Main CB, 315 MVA Xmer-IV Main & Tie CB, 220 KV Ganjbasoda CB

11 400 KV Astha (i)400/220 ICT-1 MW Value is wrong. (ii) 400 KV Bus Coupler CB Status (iii)Frequency of 400 KV & 220 KV Bus is wrong.

12 220 KV SHAHDOL (i) CB status of 132 KV Bus Coupler

13 220 KV Rajgarh Biaora (i) 220 KV Bus Coupler & TBC CB status (ii) 132 KV Voltage & Frequency

14 132 KV Polaikalan All telemetered data is wrong

The Discrepancies pertaining to MPPGCL stations are persisting since long time & no corrective actions have been taken. The commissioning of new SCADA/EMS system at SLDC is completed and for successful functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. Hence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.

Agenda of 64th OCC of MP 20

[ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL]

9.3 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- As per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW

and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017, letter No. SE/LD:E&T/34 dated 13-04-2017, letter No. SE/LD:E&T/143 dtd.26-05-17, , letter No. SE/LD:E&T/309 dtd.19-07-17, letter No. SE/LD:E&T/980 dtd.14.03.18 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. The matter was again taken up vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following generating units is still to be extended to SLDC SCADA system:-

S.No. Name of Generating Station Unit.No. 1 Satpura TPS 6,7,8,9 2 SGTPS 1,2,3,4 4 BARGI HPS 1,2 5 PENCH HPS 1,2

In addition to above, the RGMO/FGMO status of Tons HPS is showing incorrect.

In last OCC, MPPGCL informed that RGMO/FGMO signal of Bargi HPS shall be completed by June 18 & confirmed that balance shall be completed shortly. But no progress in the matter is observed.

MPPGCL is thus requested to kindly arrange for integration of telemetry of RGMO/FGMO in RTU installed at power stations & rectification of incorrect RGMO/FGMO status of Tons HPS. 9.4(a) Non Availability/ Unreliable telemetry of Hydel Power Stations :-

The telemetry of Bansagar III, Tons, Pench, Bargi, Bansagar II,Madikheda is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

Name of HPS Present

Status Availability

Feb-18 Mar-18 Apr-18 May-18

Pench Intermittent 0 % 0% 0% 22% Bansagar-III Intermittent 0 % 0% 0% 0% Bansagar-II Intermittent 37% 39% 58% 97% Madikheda Intermittent 63% 58% 15% 61% Rajghat Intermittent 90% 85% 94% 90% Gandhisagar Intermittent 24% 75% 88% 87% Bargi Intermittent 92% 95% 92% 78% Tons Intermittent 96% 98% 94% 44% Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS

Agenda of 64th OCC of MP 21

It is to mention that as per CERC communication regulation 2017, availability of telemetry is

required to be ensured more than 99.9% but as indicated above the telemetry availability of Hydel Power Stations is very low.

SLDC vide letter SE/LD:E&T/38 dtd.12.04.18 requested MPPGCL to provide the contact details

of officers at each power house looking after telemetry work, however, the same is still to be provided.

[Action :- ED(O&M:Gen),MPPGCL] (b) Non Availability/ Unreliable voice communication Between SLDC to Thermal/ Hydel Power Stations :-

It is to inform that as per CERC communication regulation 2017, availability of communication channel is required to be ensured more than 99.9%. However, Despite constant pursuance, presently most of the PLCC voice communication of various power stations to SLDC is out since long time and detailed of non availability as here under :-

Name of HPS/TPS PLCC No. Present Status Remark

Pench 076-80 Out since last 2 year Problem in PLCC cabinet at Pench end.

Bansagar-III 068-35 Out since last 3 year Site personal inform that, they have no instruction to restore the PLCC voice communication.

Bansagar-II 068-20/30 Out since last 3 year Site personal inform that, they have no instruction to restore the PLCC voice communication.

Bansagar-IV - PLCC voice communication is not established.

Madikheda 064-31 Out since last 1 year Problem in PLCC channel.

Rajghat 063-22 Out since last 2 year Problem in PLCC channel.

Tons 069-20/30 Out since 13/06/2018 Birsinghpur HPS 025-20/30 Since long time Gandhisagar 32-21 Out since 19/06/2018 -. Birsinghpur TPS 015-20/30 Out since last 3 year. New Exchange at

Birsinghpur TPS yet to be commissioned.

Satpura TPS 055-20/30 Out since last 1 year Problem in PLCC cabinet at Satpura TPS side.

The restoration of above PLCC voice Communication is of utmost importance as lot of

inconvenience in system operation is observed by SLDC as voice communication through Mobile/ P&T lines is not reliable and remains out /unreachable for most of the time.

Agenda of 64th OCC of MP 22

9.5 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA SYSTEM

WRLDC vide letters dtd. 03.05.17 & 15.05.17 intimated that SOE of grid disturbance at 220 KV

S/s Mahalgaon & 400 KV S/s Indore is not received in Back-up LDC SCADA/Sub-LDC SCADA system respectively. SLDC is carrying out data validation of various substations periodically & it is observed that SOE from various substations like 400 KV S/s Satpura, 400 KV S/s Astha, 220 KV S/s Damoh, 220 KV Itarsi, 220 KV Barwaha, 220 KV Chhindwara, 220 KV Pandhurna, 220 KV Sabalgarh, 220 KV Shivpuri, 220 KV S/s Tikamgarh, 220 KV S/s Mahalgaon, 220 KV S/s Hoshangabad, 220 KV Shujalpur, 220 KV S/s Badod was not received at SLDC SCADA system. Subsequently SLDC vide letter SE/LD:E&T/200 dtd. 14-06-17 requested MPPTCL to arrange simulation testing for SOE of all RTUs.

Accordingly, the SOE verification was taken up in Indore and Jabalpur area and wrong SOE with

wrong time was observed in 220 KV S/s Badod, 132 KV Dewas BNP, 220 KV Ujjain, 132 KV Sonkatch, 220 KV Shujalpur, 132 KV Suwasra, 132 KV Chapda, 400 KV Julwaniya, 132 KV Depalpur, 220 KV Rajgarh, 220 KV Barwaha, 220 KV Neemuch. The matter was taken up and initially filed persons were reluctant to verify the same in RTU. However, after long pursuance, the matter was investigated and it was found that the settings “inf code 2” & “inf code 4” were not correct at the RTU end. These settings have now been changed & correct time stamping of above stations is now available to SLDC. Accordingly, the SOE verification from all other RTUS are required to be done.

Receiving of SOE is very essential for analysis & investigation of major trippings in the grid.

MPPTCL, MPPGCL & NHDC are again requested to arrange simulation testing for SOE of all RTU’s in coordination with SLDC SCADA/Back Up SLDC/Sub LDC SCADA system & also issue necessary instructions to sort out the issues for ensuring proper receipt of SOE in SLDC SCADA system.

9.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication channel is discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01

132KV Morwa S/s

More than one and half Year.

02 132 KV Mungaoli More than one month

03 132 KV Waidhan S/s Very intermittent

04 Bargi HPS Very intermittent

05 Tons HPS Very intermittent

06 220 KV Rewa Very intermittent

Agenda of 64th OCC of MP 23

07 Bansagar III HPS Very intermittent

08 220 KV Chhindwara Very intermittent

09 220 KV Chhatarpur Very intermittent

10 220 KV Ganjbasoda Very intermittent

11 220 KV Gwalior II Very intermittent

12 220 KV Morena Very intermittent

13 Omkareshwar HPS Very intermittent

14 220 KV Malanpur Very intermittent

15 220 KV Mehgaon Very intermittent

16 220 KV Sirmour Very intermittent

17 220 KV Sidhi Very intermittent

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority. MPPTCL & MPPGCL are also requested to arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which injects the noise in the channel/system. It is to mention that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more then 99.9%. However, presently, availability of most of the RTUs is less then 50%. MPPGCL and MPPTCL is required to initiate necessary action to ensure availability as per CERC regulation. [Action :- ED(O&M:Gen),MPPGCL] 9.7. UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS : The W.B node at Birsinghpur TPS has already been commissioned in 2016. However, despite constant pursuance utilization of node is still pending since last two years due to pending work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. [Action :- ED(O&M:Gen),MPPGCL] 9.8 MAINTENANCE OF OPGW WORK OF MPPTCL EHV LINE SECTION:

Agenda of 64th OCC of MP 24

Recently, break in OPGW was observed on dt. 13/06/2018, between 220 KV Satna to 220 KV Katni EHV line section. Due to this all 15 telemetry routed through 220 KV Satna node was out. SLDC requested to EHT section Satna & Damoh for early restoration of OPGW and informed that they have no arrangement related with OPGW related work. As restoration of around fifteen telemetry routed through Satna along with Satna PGCIL was required on top most priority, M/s PGCIL who is doing the “Master Telecom Project” deputed their team for rectification of OPGW for the MPPTCL EHV line section. Due to the help of M/s PGCIL, OPGW communication of Satna section was restored on 23/06/2018. It is here to mention that the support for PGCIL was available for rectification of OPGW on 220KV Satn- 220KV Maiher- 220KV Katni MPPTCL section due to ongoing project works. The same support may not be available in future. Therefore, it is necessary that MPPTCL may plan the OPGW rectification work in advance so that the delay in restoration of fault related with OPGW may be avoided. [Action :-CE (EHT ), MPPTCL] 9.9 TELEMETRY OF RAILWAY TSS SUB STATIONS:-

The telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. In last OCC, the railway representative informed that telemetry of twenty railway traction substation shall be commissioned by Sep18. It was also informed by railway representative that action to arrange telemetry of balance 18 No. traction sub stations shall be arranged by central railway. Railway is requested to provide current progress in the matter along with the timeline. Further railway is also requested to expedite the progress of providing telemetry of existing 38 Railway TSS & upcoming 25 New Railway TSS.

9.10 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:- Under the “Unified Real Time Dynamic State Measurement” URTDSM Project, the analytics applications has been installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-stations where PMU’s are installed and its adjacent sub-stations (list of S/s enclosed as Annexure-9.9.1). The format for submitting the required details is enclosed as Annexure-9.9.2. The required data has been received from SGTPS, MPPGCL. MPPTCL is requested to furnish the data at the earliest.

[Action :- MPPTCL] ITEM NO 12 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 65th Operation and Coordination Committee meeting of MP on 28-08-2018. The host and venue of the same shall be decided in the meeting.

***********

Agenda of 64th OCC of MP 25

Annexure-2.1

S. No. Particulars

1

1.1 Maximum Frequency 50.08 HzBetween 07.00 hrs & 08.00 Hrs on 09.04.18

50.1 HzBetween 04.00 hrs & 05.00 Hrs on 03.05.18

1.2 Minimum Frequency 49.81 HzBetween 14.00 hrs & 15.00 Hrs on 27.04.18

49.77 HzBetween 19.00 hrs & 20.00 Hrs on 26.05.18

1.3 Average Frequency 49.97 Hz 49.95 Hz

2

2.1 Maximum Frequency 50.2 HzAT 18.02.10 HRS ON 29.04.18

50.2 HzAT 04.03:10 HRS ON 03.05.18

2.2 Minimum Frequency 49.62 HzAT 10.44:50 HRS ON 23.04.18

49.57 HzAT 19.49:10. HRS ON 26.05.18

3 Percentage of time when frequency was :-

%age of time when frequency was Apr-18 May-18

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 12.80 22.52

3.7 Between 49.9 Hz and 50.05 Hz 79.57 70.06

3.8 Between 50.05 Hz AND 51.5 Hz 7.63 7.42

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Apr-18 May-18

Agenda of 64th OCC of MP 26

I

S.No. NAME OF THE TRANSMISSION LINE /

(FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH CIRCUIT

KMS.

MONTH OF COMPLETION

DATE OF COMMI-SSIONING

A. 400 KV TRANSMISSION LINES

B. 220 KV TRANSMISSION LINES

C. 132 KV TRANSMISSION LINES

1132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to 132kV RTS Ashoknagar (2x4.726)

DCDS 4.726 9.452 April'2018 11.04.2018

2

132kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at village Mukhtyara (1x2.421) (Contribution Supervision Work)

DCSS 2.421 2.421 May'2018 05.05.2018

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO

(KV)

No.OF X-mer & Cap.(MVA)

EFFECTIVE

CAPACITY MVA

MONTH OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer (ADB-III)

400/220 1x315 315 April'2018 17.04.2018

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

b. 220KV ADDITIONAL TRANSFORMERS

1Betul 220 kv s/s Addl. 160 MVA X-mer (ADB-III)

1x160 160 April'2018 30.04.2018

C. 132 KV SUBSTATIONS

a. 132KV NEW SUBSTATIONS

1Udaipura 132kv s/s with 1x40 MVA (ADB-III)

132/33 1x40 40 April'201827.04.2018

(33kV)

ANNEXURE - 2.2.5.i

M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2018-19 (UP TO 31.05.2018)

EHV TRANSMISSION LINES

EHV SUB - STATIONS

Agenda of 64th OCC of MP 27

S. No. NAME OF THE TRANSMISSION LINEFUNDING AGENCY

PROGRESS IN %

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II) - Pithampur (2x69.968+ 2x68.626)

UBI 66%

2 400kV DCDS (Quad moose) line from Pithampur - Badnawar (2x70) UBI 58%

3LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375)

ADB-III 26%

4LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar (4x8.163)

ADB-III 43%

5 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s GEC 17%

6400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s

GEC 14%

7 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s GEC 9%8 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s GEC 36%9 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s GEC 14%B. 220 KV TRANSMISSION LINES1 2nd Ckt of 220kv Satna - Chhatarpur line (152) JICA-I 50%

2LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kV S/S (4x6.012)

UBI 36%

3LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

ADB-III 3%

4 220Kv DCDS line from Pithampur-Depalpur line (2X31) ADB-III 37%

5220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

ADB-III 19%

6 220Kv DCDS Julwaniya- Kukshi (2X58) ADB-III 16%7 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) ADB-III 16%8 220kV DCDS Khandwa(400 PGCIL) - Chhanera line(2x39.322) ADB-III Saving 52%

9LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara (4x4.382)

ADB-III Saving 100%

10LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2)

ADB-III Saving 72%

11Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)

ADB-III Saving 37%

12220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line & lilo of Morena 400KV S/s (Adani) to Sabalgarh at Morena 220Kv s/s (2X92 + 2x0.5)

ADB-III Saving 83%

Part (a).Morena 400kV CWRTL Adani Group - Morena 220 (Jarerua) (2x24.685cktkm) charged on 31.03.2018)(b).220Kv DCDS line Morena(400KV S/s CWRTL Adani Group) - Sabalgarh220 (2x69.964)

13 220kV DCDS line from Julwaniya 400kV S/s in Sendhwa 220kV S/s GEC 40%14 220kV DCDS line from Badnawar 220kV S/s - Kanwan 220kV S/s GEC 14%15 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s GEC 13%

16LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.427)

GEC 8%

17220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s

GEC 10%

18 220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s GEC 47%19 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s GEC 7%

20220kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s

GEC 47%

ANNEXURE-2.2.5.ii

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.05.2018

Agenda of 64th OCC of MP 28

21 2nd circuiting of Ratlam switching - Dalod 220kV DCSS line GEC 61%22 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) GEC 15%

220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)

60%

a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point (2x8.813)

charged on 23.05.2017

b) Tap point to 400 kV S/s Sitamau (2x34.613) 51%

24220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X0.917)

RUMS 100%

25220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572)

RUMS 100%

26220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X0.917)

RUMS 5%

132 KV TRANSMISSION LINES1 132kv Mugaliya Chaap - Sehore DCSS line (1x24) JICA 60%2 132 kv DCSS Dewas-Barotha line (1x23) JICA 90%3 132kv DCSS Gautampur -Depalpur line (1x19) JICA 56%4 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) JICA 40%

5132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209)

JICA 80%

6LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)

JICA 54%

7 132 kv DCSS Guna-Eshagarh line (1x72) JICA 32%

8LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x1)

UBI 0%

9 132 kv Sirmour - Katra DCDS line (2x37.67) UBI 18%

10LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

Transco 40%

11 132 kv DCSS Dewas-Agrod line (1x20.76) ADB-III 76%12 132 kv DCSS Khurai- Khimlasa line (1x20.937) ADB-III 20%13 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) ADB-III 96%14 132 kv DCSS Panagar - Patan line (1x22.749) ADB-III 7%15 132 kv DCSS Badnagar - Chhayan Line (1x31) ADB-III 43%16 132 kv DCSS Dhar - Teesgaon line (1x15.35) ADB-III 16%17 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) ADB-III 5%18 132 kv DCSS Udaipura - Silvani line (1x25.8) ADB-III 38%19 132 kv DCSS Narsinghpur - Devnagar (1x23) ADB-III 18%20 132 kv DCSS Karakbel - Belkheda (1x24.445) ADB-III 23%21 132 kv DCDS Narsinghpur - Karakbel line (2x23) ADB-III 25%

22 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)

ADB-III 97%

23LILO of one ckt.(Balaghat-Katangi ckt) Of 132 kV Balaghat - Seoni/Katangi line at 132 kV S/s Waraseoni (2x4.7)

ADB-III 35%

24LILO of both ckt. Of 132 kV Balaghat - Bhanegaon line at Balaghat/Kirnapur 400kV S/s.(2x0.774 + 4x1.216)

ADB-III 93%

25 132kV DCSS Sagar - Rehli line (1x40) ADB-III Saving 16%

26LILO of one ckt of 132kv Neemuch - Mandsore line at Budha 132KV Sub-station (2x22.077)

ADB-saving 83%

27LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 220KV S/s (4x14)

ADB-saving 47%

28LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 220KV S/s (2x3)

ADB-saving 60%

29 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) ADB-saving 85%30 132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+ 4x1.457) ADB-saving 55%31 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) ADB-saving 44%32 LILO of one ckt of Vidisha - Gairatganj line at 132kV Raisen(2x18.221) ADB-saving 100%33 132kv DCDS line Guna-Bhonra (2x21.394) ADB-saving 36%

23 RUMS

Agenda of 64th OCC of MP 29

34 132kv DCSS line Chhindwara-Saori line (1x31.60) ADB-saving 89%35 132kv DCSS Chichli-Palohabada line (1x25.606) ADB-saving 1%36 132kv DCSS Damoh-Patera line (1x38) ADB-saving 30%37 LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047) ADB-saving 2%

38132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd.05.09.2016)

ADB-saving 79%

39 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) REC 95%40 132 KV Gourjhamar - Deori DCSS line (1x27.493) Transco 2%41 133 KV Datiya- Bhitarwar DCSS line (1x35.296) Transco 2%42 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line GEC 15%

43132kV interconnector between Kanwan 220 kV S/s & Kanwan 132kV S/s (2x13.115)

GEC 14%

44 132kV DCDS line from Kanwan 220 kV S/s - Teesgaon 132kV line GEC 49%45 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line GEC 69%

46132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon) (2x9.825)

GEC 13%

47 2nd ckt of 132kV Maihar - Amarpatan 132kV line GEC 61%

48132kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s (2x18.344)

GEC 24%

49 2nd ckt of 132kV Alot - Sitamau 132kV line GEC 45%50 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x46.866) JICA-II 44%

51132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.152)

Contrib. 47%

52132Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to RTS Bhitoni (1x5.968)

Contrib. 54%

53 132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) RTS 91%

54132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS Bhadanpur(1x13.1)

Contrib. 86%

55132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS kaima1x26.938)

Contrib. 58%

56 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) Contrib. 55%

57132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in phase manner on 132kV for RTS Singroli (1x1.809)

Contrib. 72%

58 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s Contrib. 2%

59132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Linga from 220 KV S/s Chhindwara

Contrib. 3%

60132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon

Contrib. 2%

612nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTS Mungaoli RVNL

Contrib. 99%

62 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line Contrib. 4%63 132Kv 2ph 2 wire DCSS Jaora - RTS Jaora line Contrib. 5%

64132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station Distt- Rajgarh of water Resources Department. (1x7.796)

(Supervision only)

100%

Agenda of 64th OCC of MP 30

S.No.

NAME OF THE SUBSTATIONFUNDING AGENCY

PROGRESS IN %

A. 400 KV SUBSTATIONS

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer

ADB-III 79%

2 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer ADB-III 80%3 400 KV sub-station Sagar with 2x315MVA 400/220 KV X-mer GEC 8%

B. a 220 KV SUBSTATIONS1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA ADB-III 2%2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA ADB-III 9%3 Adampur 220/33kv S/s 2x50MVA ADB-III 8%4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA ADB-III 11%

5Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA 132KV X-mer

ADB-III Saving 53%

6 220/132kV S/s Suwasara (2x160MVA + 1x50) ADB-III Saving 60%7 220 kV Indore N/Z (Upgradation) with 2x160MVA UBI 26%8 220/132kV S/s Sailana (2x160MVA + 1x63) GEC 12%9 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) GEC 20%

10 220/132kV S/s Sendhwa (Upgradation) (1x160MVA + 1x63) GEC 11%11 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) GEC 13%12 220/132kV S/s Gudgaon (1x160MVA + 1x63) GEC 5%13 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA RUMS-I 75%14 33/220kV Pooling Sub-station at Ramnagar 3x100 RUMS-I 52%C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Biston 132kv s/s1x40 MVA ADB-III 9%2 Teesgaon 132kv s/s 1x40MVA ADB-III 10%3 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) ADB-III 43%4 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) ADB-III 35%5 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) ADB-III 17%6 Khimlasa 132kv s/s 1x40 MVA ADB-III 3%7 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) ADB-III 17%8 Narsinghgarh 132kv s/s with 1x40 MVA ADB-III 7%9 Silvani 132kv s/s with 1x40 MVA ADB-III 12%

10 Bilkishganj 132kv s/s with 1x50 MVA ADB-III Saving 51%11 Khujner/Sindaota 132kv s/s with 1x50 MVA ADB-III Saving 48%12 Bisnoor/Masod 132kv s/s with 1x50 MVA ADB-III Saving 38%13 Rehli 132kv s/s with 1x50 MVA ADB-III Saving 28%14 Patera 132kv s/s with 1x50 MVA ADB-III Saving 58%15 Budha 132kV S/s with 1x50MVA ADB-III Saving 60%16 Saori 132kV S/s with 1x50MVA ADB-III Saving 10%17 Satna-II 132kV S/s with 2x50MVA ADB-III Saving 55%18 Shahpura 132kv s/s with 1x40 MVA (Barwani) JICA-II 49%19 Pipalpani 132kV S/s with 1x50 MVA UBI 13%

20 IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) contribution

work16%

Agenda of 64th OCC of MP 31

Annexure-2.3(i)

Apr-18 May-18 Apr-18 May-18

Commissinary HQ 23:56 23:57 23:39 23:30

District HQ 23:52 23:53 23:42 23:39

Tehsil HQ 23:48 23:48 23:35 23:29

Rural -Mixed 23:37 23:39 22:57 22:47

Rural -DLF 23:37 23:39 23:04 22:59

Rural -Irrigation 9:58 9:58 9:38 9:32

Apr-18 May-18 Apr-18 May-18

Commissinary HQ 23:43 23:47 23:47 23:44

District HQ 23:51 23:45 23:49 23:48

Tehsil HQ 23:43 23:40 23:42 23:40

Rural -3Phase 23:47 23:20 23:19 23:16

Rural -1Phase 23:32 23:29 23:25 23:23

Total Rural 9:45 9:42 9:47 9:44

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda of 64th OCC of MP 32

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Anuppur 33KV Jaithari feeder (Mojer bear)

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV AKVN-I 21.06.2016 07.02.2017

33KV AKVN-II 21.06.2016 07.02.2017

132KV Rau 33KV Panther-I 14.03.2014 14.03.2014132KV Raukhedi 33KV Exep.Panther-III 09.07.2015 09.07.2015

132KV Chhegaon-Makhan33KV Khandwa Oil(Previously known as Chichgaon)

-- 18.11.2016

132KV Khandwa 33KV Amalpura 30.01.2011 19.08.201633KV Shri Durga Khandwari 03.04.2017 08.12.2017

33KV Bhargaon 16.11.2017 18.11.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV Mokdi 15.03.2017 18.10.201733KV Kanwas 15.03.2017 16.12.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Ganjbasoda 33 KV Simcon Solar Power 18.11.2016 --

132KV Pansemal

132KV Khachrod

Annexure-2.3.(ii)

BHOPAL REGION

220KV

UJJAIN REGION

NIL

NIL

NIL

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR

REWA REGION

(For which group to be allocated)

220KV

JABALPUR REGION

INDORE REGION

132KV

SAGAR REGION

NIL

132KV

220KV

220KVNIL

132KVNIL

220KV

132KV

220KV

132KVNIL

400KV

400KV Julwaniya

Agenda of 64th OCC of MP 33

Annexure-2.3.(ii)

132 KV Bareli 33 KV Boras 19.02.2014 --132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --132 KV Amrawad- Khurd 33 KV Katara Hills-II 01.06.2016 --

33 KV Obedullaganj 05.05.2016 02.02.201733 KV AKVN-1 05.05.2016 05.10.201633 KV AKVN-2 05.05.2016 05.10.201633 KV AKVN-1 29.12.2015 02.07.201633 KV AKVN-2 29.12.2015 24.02.201633 KV Aligarh Kotra 28.08.2017 20.12.201733 KV Madankhedi 27.06.2017 05.01.201833 KV Anantpura 15.06.2017 22.05.201833 KV Dewanganj 04.12.2017 04.12.201733 KV Aamkheda 04.12.2014 04.12.2017

132 KV Entkhedi, Bhopal 33 KV Entkhedi 10.01.2018 10.01.201833 KV Incoming 27.04.2018 04.06.201833 KV Thaladigawan 26.04.2018 04.06.201833 KV Boras 04.06.2018 06.06.2018

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Gwalior-II 33 KV DIG Nayagaon (CRPF) 13.11.2017 13.11.2017

132 KV Datia 33 KV Karapura 17.05.2014 --132 KV Ron 33 KV Mangarh 21.11.2013 --132KV Gohad 33kV Gohad 03.12.2015 11.07.2016132KV Vijaypur 33kV Dord 22.08.2011 29.07.2016

33kV Banbar 05.08.2017 06.08.201733kV Chinor 05.08.2017 06.08.201733kV Karhiya 05.08.2017 06.08.201733kV Gharsondi 05.08.2017 10.08.201733kV Dimani 18.07.2017 18.07.201733kV Khadiyahar 05.08.2017 05.08.201733kV Ajnodha 29.12.2017 29.12.201733kV Bairad 23.12.2017 24.12.201733kV Gazigarh 24.12.2017 15.02.201833kV Govardhan 24.12.2017 12.05.2018

132 KV

132KV Badagaon

132KV Chinor

132 KV Bagroda

132 KV Salamatpur

GWALIOR REGION

132 KV

220 KV

132 KV Lateri

132 KV Udaipura

132KV Bairad

132 KV Tamot

Agenda of 64th OCC of MP 34

Date Time Date Time

1 400315 MVA transformer 1 and 400 Kv BDTCL 1 Tie CB at 400KV S/s Bhopal

02-Jul-18 09:00 16-Jul-18 17:00 Continue1 No.400Kv CB and 6 No.CT replacement under PSDF scheme

2 400315 MVA X-mer-III at 400KV S/s Bina

03-Jul-18 08:00 03-Jul-18 17:00 Daily For NIFPS System Commissioning work

3 400315 MVA X-mer-III at 400KV S/s Bina

04-Jul-18 08:00 04-Jul-18 17:00 Daily For NIFPS System Commissioning work

4 400315 MVA transformer 1 at 400KV S/s Bhopal

13-Jul-18 09:00 13-Jul-18 17:00 Daily For maintenance & Testing work

5 400315 MVA transformer 3 and 400 Kv Itarsi 1 Tie CB at 400KV S/s Bhopal

18-Jul-18 09:00 31-Jul-18 17:00 Continue1 No. 400 Kv CB and 6 No.CT replacement under PSDF scheme

6 400400 KV Main Bus II at 400KV S/s Indore

23-Jul-18 09:00 25-Jul-18 18:00 ContinueFor replacement of 400KV Main bus -II PG Isolator of ICT I

7 400 400KV ICT I at 400KV S/s Indore 23-Jul-18 09:00 25-Jul-18 18:00 Continue 400 KV ICT-I on TBC

8 400315 MVA transformer 3 at 400KV S/s Bhopal

27-Jul-18 09:00 27-Jul-18 17:00 Daily For maintenance & Testing work

9 400315 MVA transformer 1 at 400KV S/s Bhopal

31-Aug-18 09:00 01-Sep-18 18:00 Continue 220Kv CT replacement under PSDF Scheme.

1 400400KV Nagda-Rajgarh-I Line Reactor

04-Jul-18 08:00 04-Jul-18 18:00 Daily For maintenance & Testing work

2 400400/220kv 125 MVAR BHEL REACTOR at 400KV S/s Katni

04-Jul-18 8:00 06-Jul-18 18.00 Continue Attending Oil leakage & Air cell attending work

3 40050 MVAr Line Reactor-I at 400KV S/s Bina

06-Jul-18 08:00 16-Jul-18 17:00 Continue For C.B. replacement work

4 400400KV Nagda-Rajgarh-II Line Reactor

06-Jul-18 08:00 06-Jul-18 18:00 Daily For maintenance & Testing work

5 40050MVAr BUS Reactor at 400KV S/s Bina

20-Jul-18 08:00 28-Jul-18 17:00 Continue For C.B. replacement work

A- 400 KV TRANSFORMERS

B- 400 KV REACTORS

Annexure-3.2

Planned shutdown of transmisison element for the duration 01-07-18 TO 31-08-18

Sr. No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

Agenda of 64th OCC of MP 35

6 400400KV 50MVAr Bus Reactor at 400KV S/s Nagda

06-Aug-18 08:00 06-Aug-18 18:00 Daily For disc insulator replacement work by EHT

7 400400KV 125MVAR Bus Reactor at 400KV S/s Nagda

7-Aug-18 08:00 7-Aug-18 18:00 Daily For disc insulator replacement work by EHT

1 400400KV Main Bus II at 400KV S/s Katni

02-Jul-18 08:00 03-Jul-18 18:00 Continue For maintenance work

2 400400 KV Main Bus I at 400KV S/s Indore

02-Jul-18 09:00 04-Jul-18 18:00 Continuefor replacement of 400KV Main bus -I PG Isolator of Buscoupler

3 400400 KV Main Bus I at 400KV S/s Indore

05-Jul-18 09:00 07-Jul-18 18:00 Continuefor replacement of 400 KV PG Isolator of Nagda & main bus-I

4 400 400KV Indore-Nagda 05-Jul-18 09:00 07-Jul-18 18:00 Continue 400 KV Nagda on TBC

5 400400KV Main Bus I at 400KV S/s Indore

09-Jul-18 09:00 11-Jul-18 18:00 Continuefor replacement of 400 KV ISP-I PG Isolator of main bus-I

6 400 400KV Indore-ISP I 09-Jul-18 09:00 11-Jul-18 18:00 Continue for 400 KV ISP-I on TBC

7 400 400KV Bhopal-BDTCL-I 16-Jul-18 09:00 16-Jul-18 18:00 Daily For maintenance work

8 400400KV Main Bus I at 400KV S/s Indore

19-Jul-18 09:00 21-Jul-18 18:00 Continuefor replacement of 400KV ISP-I PG Isolator of main bus-I

9 400 400KV Indore-ISP-II 19-Jul-18 09:00 21-Jul-18 18:00 Continue for 400 KV ISP-I on TBC

10 400 400KV Bhopal-Itarsi-I 31-Jul-18 09:00 31-Jul-18 18:00 Daily For maintenance work

11 400400KV BDTCL 1 Main CB at 400KV S/s Bhopal

01-Aug-18 09:00 13-Aug-18 18:00 ContinueReplacement of 400 Kv CB and 3 400 Kv CT under PSDF Scheme. Line will remain charged through Tie CB

12 400400KV Bhopal-I (TIE C.B.) at 400KV S/s Bina

01-Aug-18 08:00 10-Aug-18 17:00 ContinueS/d for TIE CB replacement work (No Interruption occurred during S/d)

13 400400KV Main Bus I at 400KV S/s Indore

01-Aug-18 09:00 02-Aug-18 18:00 Continuefor 2 Nos.CVT Replacement & 400 KV Asoj II will be on TBC

14 400400KV Main bus-I at 400KV S/s Nagda

02-Aug-18 08:00 04-Aug-18 18:00 Continue For disc insulator replacement work

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

Agenda of 64th OCC of MP 36

15 400400KV Main Bus II at 400KV S/s Indore

03-Aug-18 09:00 04-Aug-18 18:00 Continue for CVT Replacement & 400 KV Asoj II will be on TBC

16 400400KV Main bus-II at 400KV S/s Nagda

06-Aug-18 08:00 08-Aug-18 18:00 Continue For disc insulator replacement work

17 400 400KV Nagda-Rajgarh-I feeder 06-Aug-18 08:00 07-Aug-18 18:00 Continue For disc insulator replacement work

18 400 400KV Indore-ISP II 06-Aug-18 09:00 07-Aug-18 18:00 Continue for 3 Nos.CVT Replacement

19 400 400KV Nagda-Rajgarh-II feeder 08-Aug-18 08:00 08-Aug-18 18:00 Daily For disc insulator replacement work

20 400400KV Main Bus I at 400KV S/s Indore

08-Aug-18 09:00 10-Aug-18 18:00 Continuefor ICT-I PG Isolator replacement & ICT-I will be on TBC

21 400 400KV Bhopal-BDTCL-I 13-Aug-18 09:00 13-Aug-18 18:00 DailyTesting work after replacement of CB.Line will be under shutdown

22 400400KV Main Bus I at 400KV S/s Indore

16-Aug-18 09:00 18-Aug-18 18:00 Continuefor 400KV Nagda P.G Isolator Replacement & 400 KV Nagda will be on TBC

23 400400KV Itarsi 1 Main CB at 400KV S/s Bhopal

17-Aug-18 09:00 30-Aug-18 18:00 ContinueReplacement of 400 Kv CB and 3no 400 Kv CT under PSDF Scheme. Line will remain charged through Tie CB

24 400400KV Bhopal-I (MAIN C.B.) at 400KV S/s Bina

17-Aug-18 08:00 27-Aug-18 17:00 Continue For MAIN CB replacement work

25 400 400KV Bhopal-Itarsi-I 30-Aug-18 09:00 30-Aug-18 18:00 DailyTesting work after replacement of CB. Line will be under shutdown

Agenda of 64th OCC of MP 37

1 220 220KV Chhindwara -PGCIL-I 08-Aug-16 11:00 08-Aug-16 16:00 Daily DPR relay testing and Maintenance of Equipment

2 220 220KV Sagar-Damoh(PGCIL)-I 02-Jul-18 09:00 02-Jul-18 17:00 Continue For maintenance work

3 220 220KV Sagar-Damoh(PGCIL)-II 03-Jul-18 09:00 03-Jul-18 17:00 Continue For maintenance work

4 220 220KV Mehgaon-Adani feeder 04-Jul-18 09:00 04-Jul-18 17:00 Daily For maintenance work

5 220 220KV Pandhurna- Kalmeahwar 04-Jul-18 09:00 04-Jul-18 16:00 Daily DPR relay testing and Maintenance of Equipment

6 220 220KV Mehgaon-Auraiya 05-Jul-18 09:00 05-Jul-18 17:00 Daily For maintenance work

7 220 220KV Sagar-Bina-I 06-Jul-18 09:00 06-Jul-18 17:00 Continue For maintenance work

8 220 220KV Sagar-Bina-II 07-Jul-18 09:00 07-Jul-18 17:00 Continue For maintenance work

9 220220KV Main bus-I at 200KV S/s Shivpuri

09-Jul-18 09:00 09-Jul-18 17:00 Daily For maintenance work

10 220 220KV Damoh-Katni 09-Jul-18 09:00 09-Jul-18 17:00 Continue For maintenance work

11 220 220KV Chhindwara -PGCIL-I 10-Jul-18 09:00 10-Jul-18 16:00 Daily For maintenance work

12 220 220KV Mahalgaon - PGCIL-I 11-Jul-18 09:00 11-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

13 220220KV Main bus-II at 200KV S/s Shivpuri

11-Jul-18 09:00 11-Jul-18 17:00 Daily For maintenance work

14 220 220KV Mahalgaon - PGCIL-II 12-Jul-18 09:00 12-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

15 220 220KV MPPTCL Damoh Traction-I 12-Jul-18 09:00 12-Jul-18 17:00 Continue For maintenance work

16 220 220KV Chhindwara -PGCIL-II 12-Jul-18 09:00 12-Jul-18 16:00 Daily For maintenance work

17 220 220KV Malanpur - Auraiya 13-Jul-18 09:00 13-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

18 220 220KV Malanpur - Auraiya 16-Jul-18 09:00 16-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

D- 220 KV FEEDER & BAYS-

Agenda of 64th OCC of MP 38

19 220 220KV ICT-I (220KV SUKHA) 16-Jul-18 08:00 17-Jul-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

20 220 220KV Datia- Bina 17-Jul-18 09:00 17-Jul-18 17:00 Daily For maintenance work

21 220 220KV Mahalgaon - Bina 18-Jul-18 09:00 18-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

22 220 220KV Datia- Gwalior 18-Jul-18 09:00 18-Jul-18 17:00 Daily For maintenance work

23 220 220KV Mahalgaon - Bina 19-Jul-18 09:00 19-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

24 220 220KV ICT-II (220KV SUKHA) 19-Jul-18 08:00 20-Jul-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

25 220 220KV Malanpur - Adani 20-Jul-18 09:00 20-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

26 220 220KV Malanpur - Adani 23-Jul-18 09:00 23-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

27 220 220KV Malanpur - Adani 24-Jul-18 09:00 24-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

28 220 220KV Malanpur - Adani 27-Jul-18 09:00 27-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

29 220 220KV Mehgaon-Adani feeder 03-Aug-18 09:00 03-Aug-18 17:00 Daily For maintenance work

30 220 220KV Mehgaon-Auraiya 04-Aug-18 09:00 04-Aug-18 17:00 Daily For maintenance work

31 220160MVA X-mer-I At 220KV s/s Mehgaon

07-Aug-18 09:00 07-Aug-18 17:00 Daily For maintenance work

32 220 220KV Seoni -PGCIL-I 07-Aug-18 09:00 07-Aug-18 17:00 Daily For C.T, C.B & Isolator Maintnance work.

33 220 220 KV Mahalgaon- PGCIL Ckt I 08-Aug-18 09:00 08-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

34 220160MVA X-mer-II At 220KV s/s Mehgaon

08-Aug-18 09:00 08-Aug-18 17:00 Daily For maintenance work

35 220 220 KV Mahalgaon- PGCIL Ckt I 09-Aug-18 09:00 09-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

36 220 220KV Seoni -PGCIL-II 09-Aug-18 09:00 09-Aug-18 17:00 Daily For C.T, C.B & Isolator Maintnance work.

Agenda of 64th OCC of MP 39

37 220 220KV Chhindwara -PGCIL-II 10-Aug-18 11:00 10-Aug-18 16:00 Daily DPR relay testing and Maintenance of Equipment

38 220 220 KV Mahalgaon- PGCIL Ckt II 16-Aug-18 09:00 16-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

39 220 220KV Datia- Bina 16-Aug-18 09:00 16-Aug-18 17:00 Daily For maintenance work

40 220 220 KV Mahalgaon- PGCIL-II 17-Aug-18 09:00 17-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

41 220 220KV Datia- Gwalior 18-Aug-18 09:00 18-Aug-18 17:00 Daily For maintenance work

42 220 220KV ICT-I (220KV SUKHA) 20-Aug-18 08:00 21-Aug-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

43 220220KV Main Bus I at 400KV S/s Indore

20-Aug-18 09:00 21-Aug-18 18:00 Continue For replacement of TBC Isolator of Bus I

44 220 220KV Indore-Barwaha- II 20-Aug-18 09:00 21-Aug-18 18:00 Continue For replacement of Bus-I Isolator

45 220220KV Tie bus at 220KV S/s Shivpuri

21-Aug-18 10:00 21-Aug-18 17:00 Daily For maintenance work

46 220 220KV Mahalgaon- Bina 23-Aug-18 09:00 23-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

47 220220KV Bus coupler at 220KV S/s Shivpuri

23-Aug-18 10:00 23-Aug-18 17:00 Daily For maintenance work

48 220 220KV ICT-II (220KV SUKHA) 23-Aug-18 08:00 24-Aug-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

49 220220KV Main Bus I at 400KV S/s Indore

23-Aug-18 09:00 24-Aug-18 18:00 Continue220 KV dewas on TBC & Bus Isolator of dewas to be replace

50 220 220KV Mahalgaon- Bina 24-Aug-18 09:00 24-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

51 220160MVA X-mer-I at 220KV s/s Datia

27-Aug-18 09:00 27-Aug-18 17:00 Daily For maintenance work

52 220160MVA X-mer-II at 220KV s/s Datia

28-Aug-18 09:00 28-Aug-18 17:00 Daily For maintenance work

53 220 220KV Mahalgaon-Datia 29-Aug-18 09:00 29-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

54 220 220KV Mahalgaon-Datia 30-Aug-18 09:00 30-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

Agenda of 64th OCC of MP 40

A. ThermalStn. Name UNIT No. Capacity

MW Apr-18 May-185 210 136.01 158.12

PH III 210 136.01 158.12TOT 210 136.01 158.12

6 200 119.11 42.217 210 98.51 41.67

PH II 410 217.62 83.888 210 99.97 96.869 210 0.00 77.78

PH III 420 99.97 174.6410 250 160.68 153.2111 250 144.73 168.65

PH IV 500 305.41 321.86TOT 1330 623.00 580.38

1 210 103.33 132.282 210 127.06 86.20

PH I 420 230.39 218.473 210 112.72 122.534 210 127.33 124.49

PH II 420 240.05 247.015 500 322.82 92.52

PH III 500 322.82 92.52TOT 1340 793.25 558.01

1 600 332.61 170.762 600 207.39 258.06

PH1 1200 540.00 428.82

4080 2092.26 1725.33

B. HydelCapacity

MW Apr-18 May-18115.0 0.88 0.00172.0 0.06 0.2799.0 0.82 1.04

386.0 1.76 1.31193.0 0.88 0.65160.0 6.21 10.35107.0 4.14 6.9090.0 11.03 26.41

315.0 21.99 25.3020.0 0.00 0.0060.0 0.00 0.0030.0 2.82 3.3945.0 0.00 0.0022.5 0.00 0.0020.0 2.46 2.7060.0 0.70 0.00

1186.0 46.96 69.47915.0 46.08 68.16917.5 44.01 65.36

CapacityMW Apr-18 May-18

Indira Sagar Hydel Project 1000 28.84 70.51Omkareshwar Hydel Project 520 12.50 32.62

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

Agenda of 64th OCC of MP 41

S No. Source Apr-18 May-18 TotalA.

1 Thermal 1923.24 1570.02 3493.272 Hydel 43.21 64.48 107.693 Total 1966.45 1634.50 3600.96

B.1 Indira Sagar 26.16 66.30 92.472 Omkareshwar 12.50 32.62 45.123 MPPMCL Schedule from Central Sector of WR 1795.68 1868.24 3663.924 MPPMCL Schedule from Central Sector ER 33.98 30.77 64.755 Total MPPMCL Schedule from Central Sector (WR+ER) 1829.66 1899.01 3728.686 Deviation Energy of (WR+ER) -25.45 -10.48 -35.927 Schedule From DVC ER 0.00 0.00 0.008 Schedule From Sugen 0.54 5.08 5.639 LANCO Amk 162.03 186.79 348.83

10 SASAN 990.18 994.72 1984.9111 ESSAR 0.00 0.00 0.0012 J P Nigri 294.92 335.85 630.7613 MB Power 192.75 208.08 400.8314 JHABUA Power 31.73 31.77 63.5015 Other Open Access Schedule other than MPPMCL Incl. Seci -80.41 -37.99 -118.3916 Himachal Pradesh HYDAL 0.00 0.00 0.0017 BARH 0.00 0.00 0.0018 Schedule from Sardar Sarovar -0.70 -0.76 -1.4619 SCH to Railway from RGPPL_ebid 160.44 165.31 325.7620 Schedule from SEZ 0.00 0.00 0.0021 Schedule from Rihand+Matatila 2.02 5.15 7.17

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012

0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00

24 Additional Power Purchase 4.87 3.27 8.1425 Energy Exchange 0.00 0.00 0.0026 Banking of Energy -441.88 -369.30 -811.1827 Sale of Power -557.64 -167.20 -724.8428 Total MP Schedule (Including Railway) 2588.52 3259.80 5848.3229 Total MP Drawal (Including Railway) 2563.07 3249.32 5812.3930 Wheeled Energy of Tawa HEG 0.00 0.00 0.0031 Wheeled Energy of Wind Farm 15.18 19.45 34.6332 Wheeled Energy of Solar Plant 68.57 61.61 130.1833 Wheeled Energy of Bio-Mass 0.00 0.00 0.0034 Wheeled Energy of Ascent Hydro 1.46 1.41 2.8735 Export to MSEB (Nepa-Dharni) -6.08 -5.89 -11.9636 Deviation Energy of MPPGCL Thermal -0.05 -3.52 -3.5737 Energy Purchased by MP from Wind Farm 437.86 584.49 1022.3538 Energy Purchased by MP from Solar Plant 151.93 162.97 314.90

39 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP

60.47 38.27 98.75

40Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

24.49 7.73 32.22

41 Deviation Energy of ISP 2.68 4.21 6.8842 Schedule Energy of BLA Power against LTOA 0.00 2.16 2.1643 Schedule Energy of JP BINA Power against LTOA 165.38 155.48 320.8644 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.0145 Chambal Complex Excess / less Overshare by MP -1.15 -1.72 -2.8746 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.02 -0.07 -0.0947 State Supply (Ex-Power st. Bus) 5488.91 6009.35 11498.2748 AVERAGE DAILY (Ex-Bus) 182.96 193.85 188.5049 MINIMUM DAILY (MP Periphery) 163.56 163.85 163.5650 MAXIMUM DAILY (MP Periphery) 185.36 197.05 197.0551 State Supply (Ex-Power st. Bus):- YEAR : 2017-18 5494.33 5544.84 11039.1752 Year ((18-19)-(17-18))*100/Year (17-18) -0.10 8.38 4.1653 Unshedule L/S : Year-2018-19 0.00 0.00 0.0054 Frequency Correction 5.16 8.76 13.9255 Restricted Requirement : Year-2018-19 5494.07 6018.11 11512.1856 Shedule L/S : Year-2018-19 0.00 0.00 0.0057 Un-Restricted Requirement : Year-2018-19 5494.07 6018.11 11512.18

ENERGY BALANCE SHEETYear : 2018 - 19

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Agenda of 64th OCC of MP 42

S.NO. Apr-18 May-18 Yr 18-19

C.1 DEMAND MET 8511 8641 86412 LOAD RELIEF 0 0 03 LOAD SHEDDING 0 0 0D.1 DEMAND MET 7908 8306 83062 LOAD RELIEF 0 0 03 LOAD SHEDDING 0 0 0F. REGISTERED MAXIMUM 8621 8916 8916G. COMPUTED MAXIMUM DEMAND 8624 8916 8916H. UNRESTRICTED MAXIMUM DEMAND 8624 8916 8916I.1. Div. Head Quarters 23:47 23:44 23:452. District Head Quarters 23:49 23:48 23:483. Tahsil Head Quarters 23:42 23:40 23:414. Rural -Mixed 23:19 23:16 23:185. Rural -DLF 23:25 23:23 23:246. Rural -Irrigation 9:47 9:44 9:46J LOAD FACTOR % 88.43 90.59 89.51

S.N PARTICULARS Apr-18 May-18 Yr 18-19

A. INTGRATED FREQUENCY1 MAXIMUM 50.08 50.10 50.102 MINIMUM 49.81 49.77 49.77

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.20 50.20 50.202 MINIMUM 49.62 49.57 49.57

C. AVG FREQUENCY 49.97 49.95 49.96D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.002 50.05 TO 51.5 Hz 7.63 7.42 7.523 49.9 TO 50.05 Hz 79.57 70.06 74.744 49.7 TO 49.9 Hz 12.80 22.52 17.745 49.5 TO 49.7 Hz 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2018 - 19

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2018-19

Agenda of 64th OCC of MP 43

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 49.96 2909 2687 40 19 8 297 877 3928 2566 0 0 219 1310 3 397 249 43 0 206 0 -651 -401 0 0 -6 3 3938 7865 3893 -44 -7 7814 0 0 0 7824 7824

2:00 49.97 2880 2660 24 15 2 295 866 3862 2455 0 0 217 1313 2 397 233 40 0 207 0 -651 -502 0 0 -24 3 3691 7554 3566 -126 -7 7421 0 0 0 7428 7428

3:00 49.98 2878 2658 15 7 0 299 831 3811 2534 0 0 219 1322 2 396 244 43 0 206 0 -609 -656 0 0 -131 3 3574 7385 3534 -39 -7 7339 0 0 0 7345 7345

4:00 49.99 2875 2655 10 4 2 299 799 3769 2498 0 0 214 1324 1 394 244 48 0 207 0 -605 -629 0 0 -131 3 3569 7338 3501 -68 -7 7263 0 0 0 7266 7266

5:00 49.94 2888 2668 12 22 15 301 782 3799 2553 0 0 214 1331 2 395 263 48 0 207 0 -605 -774 0 0 -131 3 3504 7304 3463 -42 -7 7255 0 0 0 7267 7267

6:00 49.97 2916 2694 36 48 21 299 754 3853 2481 0 0 217 1331 2 386 264 34 0 208 0 -605 -673 0 0 -53 3 3594 7447 3536 -59 -8 7380 0 0 0 7387 7387

7:00 50.03 2926 2703 58 59 30 299 785 3934 2635 0 0 222 1358 2 385 261 43 0 208 0 -605 -315 0 0 -11 3 4186 8120 4146 -41 -9 8071 0 0 0 8071 8071

8:00 50.03 2902 2680 91 70 33 297 833 4004 2563 0 0 217 1327 1 385 266 49 0 209 0 -605 -279 10 0 -41 3 4104 8107 4040 -63 -9 8035 0 0 0 8036 8036

9:00 49.99 2896 2674 113 66 29 296 994 4172 2518 0 0 218 1329 1 385 262 37 0 209 0 -605 -318 0 0 -77 3 3961 8133 3797 -164 -9 7960 0 0 0 7965 7965

10:00 49.99 2868 2649 94 48 27 296 1192 4305 2532 0 0 217 1335 1 385 281 35 0 209 0 -605 -613 0 0 -109 3 3669 7975 3431 -238 -8 7728 0 0 0 7733 7733

11:00 49.96 2852 2634 93 44 25 299 1252 4348 2421 0 0 213 1320 1 382 233 22 0 202 0 -605 -841 0 0 -162 3 3189 7536 3152 -36 -8 7492 0 0 0 7502 7502

12:00 49.98 2844 2626 87 44 19 302 1258 4336 2382 0 0 213 1321 1 382 228 18 0 205 0 -605 -1209 0 0 -192 3 2746 7082 2611 -135 -7 6940 0 0 0 6946 6946

13:00 49.99 2894 2673 57 22 10 305 1228 4296 2496 0 0 213 1323 1 384 259 29 0 200 0 -595 -1318 0 0 -190 3 2804 7100 2842 38 -7 7130 0 0 0 7135 7135

14:00 49.96 2905 2683 46 34 19 308 1166 4255 2486 0 0 212 1324 0 390 248 28 0 200 0 -595 -1239 0 0 -180 3 2876 7130 2831 -45 -7 7079 0 0 0 7089 7089

15:00 49.93 2932 2708 58 41 19 312 1083 4222 2607 0 0 220 1350 3 390 268 47 0 204 0 -623 -1411 7 0 -163 3 2902 7124 2886 -17 -7 7101 0 0 0 7116 7116

16:00 49.95 2966 2740 53 29 17 326 926 4091 2594 0 0 217 1348 4 395 275 56 0 207 0 -623 -1365 7 0 -148 3 2968 7059 2998 30 -8 7082 0 0 0 7092 7092

17:00 49.97 2950 2726 60 29 17 324 755 3912 2656 0 0 217 1330 5 398 284 59 0 208 0 -623 -1375 7 0 -113 3 3054 6965 3042 -12 -9 6945 0 0 0 6953 6953

18:00 50.02 2906 2684 84 52 27 318 595 3759 2468 0 0 213 1313 3 402 271 55 0 209 0 -623 -1364 7 0 -114 3 2844 6603 2764 -80 -9 6514 0 0 0 6515 6515

19:00 49.97 2929 2705 94 41 19 355 589 3804 2536 0 2 212 1310 1 407 258 55 0 210 0 -592 -1115 9 0 -96 3 3199 7003 3222 23 -9 7017 0 0 0 7024 7024

20:00 49.99 2890 2670 107 55 23 360 691 3906 2431 0 2 210 1323 1 408 264 48 0 208 0 -606 -559 15 0 -132 3 3615 7521 3539 -76 -9 7436 0 0 0 7441 7441

21:00 49.97 2841 2623 62 22 10 349 801 3867 2423 0 5 213 1306 1 407 239 32 0 207 0 -606 -575 16 0 -132 3 3539 7406 3411 -129 -8 7269 0 0 0 7277 7277

22:00 49.97 2856 2637 42 41 23 342 889 3974 2382 0 2 213 1310 1 407 210 33 0 202 0 -601 -611 16 0 -132 3 3436 7411 3363 -74 -9 7328 0 0 0 7335 7335

23:00 49.94 2905 2683 88 66 31 336 913 4118 2623 0 2 220 1310 4 408 262 57 0 200 0 -619 -323 21 0 -132 3 4037 8154 4004 -32 -9 8114 0 0 0 8130 8130

24:00 49.97 2908 2686 59 67 29 308 892 4041 2517 0 2 220 1309 3 407 259 53 0 200 0 -642 -328 0 0 -37 3 3966 8007 3923 -43 -8 7956 0 0 0 7964 7964

Avg. 49.98 2896 2675 62 39 19 313 906 4015 2515 0 1 216 1324 2 395 255 42 0 206 0 -613 -783 5 0 -110 3 3457 7472 3396 -61 -8 7403 0 0 0 7410 7410

00 TO 06 HRS.

49.97 2891 2670 23 19 8 299 818 3837 2515 0 0 217 1322 2 394 250 43 0 207 0 -621 -606 0 0 -79 3 3645 7482 3582 -63 -7 7412 0 0 0 7420 7420

06 TO 12 HRS.

49.99 2881 2661 89 55 27 298 1053 4183 2508 0 0 217 1332 1 384 255 34 0 207 0 -605 -596 2 0 -99 3 3642 7826 3529 -113 -8 7704 0 0 0 7709 7709

12 TO 18 HRS.

49.97 2926 2703 60 35 18 315 959 4089 2551 0 0 215 1331 3 393 267 46 0 205 0 -614 -1346 4 0 -151 3 2908 6997 2894 -14 -8 6975 0 0 0 6983 6983

06TO 18 HRS.

49.98 2903 2682 74 45 23 307 1006 4136 2530 0 0 216 1332 2 388 261 40 0 206 0 -610 -971 3 0 -125 3 3275 7411 3212 -64 -8 7340 0 0 0 7346 7346

18 TO 24 HRS.

49.97 2888 2667 75 49 23 342 796 3952 2485 0 3 215 1311 2 407 249 46 0 205 0 -611 -585 13 0 -110 3 3632 7584 3577 -55 -9 7520 0 0 0 7528 7528

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- April 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

Agenda of 64th OCC of MP 44

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 49.96 2333 2147 82 84 36 252 1162 3762 2521 0 12 248 1271 7 442 290 41 0 193 0 -542 -103 0 0 27 7 4413 8176 4439 26 0 8184 0 0 0 8196 8196

2:00 49.98 2326 2141 38 38 10 250 1170 3647 2441 0 5 248 1271 5 440 276 33 0 192 0 -542 -105 0 0 26 7 4295 7942 4164 -132 0 7793 0 0 0 7801 7801

3:00 49.97 2321 2137 22 14 2 251 1121 3547 2395 0 2 248 1277 4 440 272 27 0 191 0 -493 -106 0 0 1 7 4264 7811 4256 -9 0 7787 0 0 0 7796 7796

4:00 50.00 2309 2126 22 14 0 254 1098 3514 2416 0 0 246 1276 4 435 253 35 0 190 0 -493 -132 0 0 -14 7 4222 7736 4209 -13 0 7707 0 0 0 7712 7712

5:00 49.96 2316 2132 25 46 22 256 1022 3504 2414 0 0 251 1282 4 435 252 37 0 193 0 -484 -155 0 0 -14 7 4223 7726 4247 25 0 7735 0 0 0 7746 7746

6:00 49.98 2326 2141 67 95 38 259 938 3537 2420 0 5 239 1282 5 434 235 36 0 191 0 -484 -126 0 0 4 7 4248 7785 4155 -93 0 7676 0 0 0 7683 7683

7:00 50.02 2332 2146 91 105 52 259 924 3576 2538 0 14 242 1275 5 431 284 49 0 192 0 -486 -99 0 0 -8 7 4445 8020 4516 72 0 8076 0 0 0 8077 8077

8:00 50.02 2338 2151 110 140 70 258 958 3688 2505 0 5 242 1284 4 431 302 42 0 192 0 -486 -81 0 0 -29 7 4417 8105 4327 -90 0 7997 0 0 0 7998 7998

9:00 49.98 2335 2149 79 81 42 257 1111 3720 2501 0 2 242 1288 3 431 280 42 0 192 0 -485 -74 0 0 -71 7 4359 8079 4201 -158 0 7905 0 0 0 7911 7911

10:00 49.97 2319 2134 85 53 38 257 1255 3822 2467 0 0 242 1291 2 431 263 50 0 192 0 -489 -210 0 0 -96 7 4152 7974 3977 -175 0 7782 0 0 0 7789 7789

11:00 49.94 2301 2118 88 74 40 256 1296 3872 2420 0 0 239 1294 1 429 226 45 0 192 0 -489 -344 0 0 -123 7 3898 7769 3895 -2 0 7749 0 0 0 7763 7763

12:00 49.95 2297 2115 91 92 42 255 1307 3900 2356 0 0 241 1298 1 428 207 36 0 192 0 -495 -496 0 0 -127 7 3648 7548 3551 -97 0 7434 0 0 0 7446 7446

13:00 49.93 2308 2125 81 92 42 259 1292 3891 2444 0 9 239 1297 2 427 242 40 0 191 0 -495 -369 0 0 -126 7 3910 7800 3977 67 0 7851 0 0 0 7868 7868

14:00 49.92 2297 2114 92 112 53 263 1241 3876 2461 0 12 235 1295 3 421 277 43 0 190 0 -495 -339 0 0 -117 7 3992 7868 4020 28 0 7880 0 0 0 7899 7899

15:00 49.89 2314 2130 114 158 76 264 1144 3886 2497 0 12 236 1303 7 423 291 50 0 191 0 -545 -366 0 0 -106 7 3999 7886 4114 114 0 7984 0 0 0 8010 8010

16:00 49.92 2321 2136 128 168 84 266 998 3780 2544 0 12 233 1302 7 423 292 51 0 192 0 -547 -338 0 0 -87 7 4091 7872 4071 -21 0 7835 0 0 0 7855 7855

17:00 49.94 2310 2126 119 129 61 264 849 3547 2517 0 9 239 1307 7 438 292 45 0 192 0 -539 -327 0 0 -50 7 4137 7684 4096 -41 0 7626 0 0 0 7642 7642

18:00 50.00 2285 2104 121 98 47 262 724 3357 2339 0 0 235 1305 2 435 248 36 0 191 0 -539 -495 0 0 -50 7 3715 7071 3572 -142 0 6912 0 0 0 6915 6915

19:00 49.97 2284 2102 76 36 26 262 716 3219 2333 0 0 232 1309 0 440 226 34 0 192 0 -445 -450 0 0 7 7 3885 7104 3876 -8 0 7078 0 0 0 7086 7086

20:00 49.93 2306 2123 134 120 56 281 831 3544 2477 0 12 239 1296 6 444 256 41 0 191 0 -442 -156 0 0 -2 7 4369 7913 4331 -38 0 7857 0 0 0 7874 7874

21:00 49.94 2303 2120 102 60 32 280 1001 3595 2464 0 0 239 1301 6 445 272 39 0 191 0 -441 -218 0 0 -2 7 4301 7896 4163 -138 0 7740 0 0 0 7754 7754

22:00 49.95 2313 2129 94 82 40 269 1073 3686 2386 0 5 239 1291 5 445 253 33 0 190 0 -441 -237 0 0 -1 7 4175 7862 4118 -57 0 7788 0 0 0 7801 7801

23:00 49.91 2333 2147 132 201 83 269 1096 3927 2555 0 21 245 1277 8 446 305 49 0 188 0 -441 -129 0 0 -1 7 4531 8459 4568 36 0 8478 0 0 0 8502 8502

24:00 49.97 2322 2137 127 202 90 256 1110 3923 2535 0 14 245 1261 7 446 310 46 0 191 0 -543 -128 0 0 21 7 4413 8335 4456 44 0 8362 0 0 0 8373 8373

Avg. 49.96 2315 2130 88 95 45 261 1060 3680 2456 0 6 241 1289 4 435 267 41 0 191 0 -495 -233 0 0 -39 7 4171 7851 4138 -33 0 7801 0 0 0 7812 7812

00 TO 06 HRS.

49.97 2322 2137 42 48 18 254 1085 3585 2435 0 4 247 1277 5 438 263 35 0 192 0 -507 -121 0 0 5 7 4278 7863 4245 -33 0 7814 0 0 0 7822 7822

06 TO 12 HRS.

49.98 2320 2136 91 91 47 257 1142 3763 2465 0 4 242 1288 3 430 261 44 0 192 0 -488 -217 0 0 -76 7 4153 7916 4078 -75 0 7824 0 0 0 7831 7831

12 TO 18 HRS.

49.93 2306 2123 109 126 60 263 1041 3723 2467 0 9 236 1302 5 428 274 44 0 191 0 -526 -372 0 0 -89 7 3974 7697 3975 1 0 7681 0 0 0 7698 7698

06TO 18 HRS.

49.96 2313 2129 100 108 54 260 1092 3743 2466 0 6 239 1295 4 429 267 44 0 192 0 -507 -295 0 0 -83 7 4063 7806 4026 -37 0 7753 0 0 0 7764 7764

18 TO 24 HRS.

49.94 2310 2126 111 117 54 270 971 3649 2458 0 9 240 1289 5 444 270 40 0 191 0 -459 -220 0 0 4 7 4279 7928 4252 -27 0 7884 0 0 0 7899 7899

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- May 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

Agenda of 64th OCC of MP 45

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.96 2510 2535 25 0 0 2538 2538 2567 2543 -24 0 0 2546 2546 2625 2522 -102 0 0 2526 2526 206 214

2:00 49.97 2424 2359 -65 0 0 2362 2362 2498 2442 -56 0 0 2445 2445 2498 2403 -95 0 0 2405 2405 207 217

3:00 49.98 2334 2357 24 0 0 2359 2359 2413 2379 -34 0 0 2381 2381 2477 2386 -91 0 0 2388 2388 206 217

4:00 49.99 2314 2324 10 0 0 2325 2325 2391 2349 -42 0 0 2350 2350 2459 2373 -86 0 0 2374 2374 207 217

5:00 49.94 2257 2306 49 0 0 2310 2310 2333 2326 -8 0 0 2330 2330 2436 2410 -26 0 0 2414 2414 207 213

6:00 49.97 2274 2221 -53 0 0 2223 2223 2370 2383 13 0 0 2385 2385 2588 2557 -30 0 0 2560 2560 208 219

7:00 50.03 2399 2353 -46 0 0 2353 2353 2544 2539 -6 0 0 2539 2539 3011 2956 -56 0 0 2956 2956 208 223

8:00 50.03 2327 2261 -66 0 0 2261 2261 2562 2522 -40 0 0 2522 2522 3018 3025 7 0 0 3025 3025 209 228

9:00 49.99 2305 2235 -69 0 0 2237 2237 2545 2505 -41 0 0 2506 2506 3077 3003 -74 0 0 3005 3005 209 217

10:00 49.99 2305 2228 -77 0 0 2229 2229 2478 2398 -80 0 0 2399 2399 2975 2880 -95 0 0 2882 2882 209 223

11:00 49.96 2223 2217 -5 0 0 2220 2220 2323 2294 -28 0 0 2297 2297 2801 2776 -25 0 0 2779 2779 202 205

12:00 49.98 2129 2011 -119 0 0 2012 2012 2174 2118 -55 0 0 2120 2120 2582 2598 16 0 0 2600 2600 205 213

13:00 49.99 2067 2079 12 0 0 2081 2081 2068 2086 17 0 0 2087 2087 2704 2760 56 0 0 2762 2762 200 205

14:00 49.96 2039 2009 -30 0 0 2012 2012 2109 2082 -26 0 0 2085 2085 2721 2781 60 0 0 2785 2785 200 206

15:00 49.93 2007 2013 6 0 0 2017 2017 2077 2062 -15 0 0 2066 2066 2712 2815 103 0 0 2821 2821 204 211

16:00 49.95 2004 1992 -12 0 0 1995 1995 2073 2069 -4 0 0 2072 2072 2701 2805 104 0 0 2809 2809 207 216

17:00 49.97 1975 1935 -40 0 0 1937 1937 2085 2059 -27 0 0 2061 2061 2681 2736 55 0 0 2739 2739 208 216

18:00 50.02 1981 1861 -119 0 0 1861 1861 2099 2023 -76 0 0 2023 2023 2470 2417 -53 0 0 2417 2417 209 213

19:00 49.97 2195 2260 66 0 0 2263 2263 2149 2252 103 0 0 2255 2255 2389 2284 -105 0 0 2286 2286 210 220

20:00 49.99 2406 2432 26 0 0 2434 2434 2433 2471 38 0 0 2473 2473 2425 2316 -109 0 0 2317 2317 208 217

21:00 49.97 2402 2418 16 0 0 2421 2421 2403 2384 -18 0 0 2387 2387 2326 2254 -72 0 0 2256 2256 207 213

22:00 49.97 2364 2375 11 0 0 2377 2377 2373 2380 7 0 0 2382 2382 2388 2368 -21 0 0 2370 2370 202 205

23:00 49.94 2594 2626 32 0 0 2632 2632 2598 2634 36 0 0 2639 2639 2678 2653 -25 0 0 2658 2658 200 201

24:00 49.97 2571 2583 12 0 0 2586 2586 2586 2587 1 0 0 2589 2589 2614 2585 -29 0 0 2588 2588 200 201

Avg. 49.98 2267 2250 -17 0 0 2252 2252 2344 2329 -15 0 0 2331 2331 2640 2611 -29 0 0 2613 2613 206 214

00 TO 06 HRS. 49.97 2352 2350 -2 0 0 2353 2353 2429 2403 -25 0 0 2406 2406 2514 2442 -72 0 0 2445 2445 207 216

06 TO 12 HRS. 49.99 2281 2218 -64 0 0 2219 2219 2438 2396 -42 0 0 2397 2397 2911 2873 -38 0 0 2874 2874 207 218

12 TO 18 HRS. 49.97 2012 1982 -31 0 0 1984 1984 2085 2063 -22 0 0 2066 2066 2665 2719 54 0 0 2722 2722 205 211

06TO 18 HRS. 49.98 2147 2100 -47 0 0 2101 2101 2261 2230 -32 0 0 2232 2232 2788 2796 8 0 0 2798 2798 206 215

18 TO 24 HRS. 49.97 2422 2449 27 0 0 2452 2452 2424 2451 28 0 0 2454 2454 2470 2410 -60 0 0 2413 2413 205 210

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- April 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 64th OCC of MP 46

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.96 2648 2719 71 0 0 2723 2723 2694 2734 40 0 0 2738 2738 2588 2509 -79 0 0 2512 2512 193 223

2:00 49.98 2572 2522 -50 0 0 2525 2525 2629 2642 13 0 0 2645 2645 2493 2413 -80 0 0 2415 2415 192 217

3:00 49.97 2518 2531 13 0 0 2534 2534 2571 2591 20 0 0 2594 2594 2500 2449 -51 0 0 2452 2452 191 216

4:00 50.00 2473 2501 28 0 0 2503 2503 2526 2562 36 0 0 2564 2564 2464 2431 -33 0 0 2433 2433 190 213

5:00 49.96 2448 2493 45 0 0 2496 2496 2497 2551 55 0 0 2555 2555 2495 2475 -20 0 0 2478 2478 193 216

6:00 49.98 2416 2323 -93 0 0 2325 2325 2511 2543 32 0 0 2545 2545 2603 2593 -9 0 0 2596 2596 191 217

7:00 50.02 2404 2376 -28 0 0 2376 2376 2544 2616 72 0 0 2616 2616 2803 2861 58 0 0 2861 2861 192 223

8:00 50.02 2376 2309 -67 0 0 2309 2309 2633 2624 -10 0 0 2624 2624 2854 2836 -18 0 0 2836 2836 192 228

9:00 49.98 2354 2275 -80 0 0 2276 2276 2640 2619 -20 0 0 2621 2621 2829 2792 -37 0 0 2794 2794 192 219

10:00 49.97 2352 2293 -59 0 0 2296 2296 2566 2537 -28 0 0 2540 2540 2788 2737 -51 0 0 2739 2739 192 214

11:00 49.94 2338 2337 -2 0 0 2341 2341 2463 2466 3 0 0 2470 2470 2755 2733 -23 0 0 2738 2738 192 214

12:00 49.95 2297 2190 -107 0 0 2194 2194 2375 2369 -6 0 0 2372 2372 2651 2655 3 0 0 2659 2659 192 220

13:00 49.93 2322 2342 20 0 0 2347 2347 2362 2395 33 0 0 2400 2400 2877 2912 35 0 0 2918 2918 191 202

14:00 49.92 2328 2322 -5 0 0 2328 2328 2405 2430 25 0 0 2436 2436 2912 2925 13 0 0 2933 2933 190 202

15:00 49.89 2329 2341 12 0 0 2348 2348 2388 2438 50 0 0 2446 2446 2945 2994 50 0 0 3004 3004 191 211

16:00 49.92 2300 2300 0 0 0 2306 2306 2391 2412 21 0 0 2419 2419 2877 2908 31 0 0 2916 2916 192 214

17:00 49.94 2219 2184 -35 0 0 2189 2189 2371 2370 -1 0 0 2375 2375 2811 2855 43 0 0 2861 2861 192 217

18:00 50.00 2088 1979 -109 0 0 1980 1980 2268 2256 -11 0 0 2257 2257 2486 2458 -28 0 0 2459 2459 191 219

19:00 49.97 2177 2258 80 0 0 2260 2260 2252 2305 53 0 0 2307 2307 2391 2291 -100 0 0 2294 2294 192 225

20:00 49.93 2522 2580 57 0 0 2585 2585 2575 2655 80 0 0 2661 2661 2567 2403 -164 0 0 2408 2408 191 219

21:00 49.94 2530 2595 64 0 0 2599 2599 2607 2644 37 0 0 2649 2649 2458 2285 -173 0 0 2289 2289 191 217

22:00 49.95 2527 2558 31 0 0 2563 2563 2597 2627 30 0 0 2632 2632 2514 2389 -125 0 0 2393 2393 190 213

23:00 49.91 2703 2818 115 0 0 2826 2826 2750 2855 105 0 0 2863 2863 2721 2603 -118 0 0 2610 2610 188 202

24:00 49.97 2693 2790 97 0 0 2793 2793 2749 2804 55 0 0 2807 2807 2679 2568 -111 0 0 2571 2571 191 201

Avg. 49.96 2414 2414 0 0 0 2418 2418 2515 2544 28 0 0 2547 2547 2669 2628 -41 0 0 2632 2632 191 215

00 TO 06 HRS. 49.97 2512 2515 2 0 0 2518 2518 2571 2604 33 0 0 2607 2607 2524 2478 -45 0 0 2481 2481 192 217

06 TO 12 HRS. 49.98 2354 2297 -57 0 0 2299 2299 2537 2538 2 0 0 2541 2541 2780 2769 -11 0 0 2771 2771 192 220

12 TO 18 HRS. 49.93 2264 2245 -19 0 0 2250 2250 2364 2384 19 0 0 2389 2389 2818 2842 24 0 0 2848 2848 191 211

06TO 18 HRS. 49.96 2309 2271 -38 0 0 2274 2274 2450 2461 11 0 0 2465 2465 2799 2806 6 0 0 2810 2810 192 215

18 TO 24 HRS. 49.94 2526 2600 74 0 0 2605 2605 2588 2648 60 0 0 2653 2653 2555 2423 -132 0 0 2428 2428 191 213

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- May 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 64th OCC of MP 47

ANNEXURE-5 System Disturbance / System Incidence

1. System Disturbance on 12.04.2018 in Tons HPS area: On dated 12.04.2018 at around

00.30 Hrs. M.P system was normal, Weather at Rewa-Tons area was Cloudy and Stormyand frequency of National Grid was 49.96 Hz. At 00.40 Hrs, Bus-Bar protection of Main Bus-II operated at Tons HPS, resulting in the tripping of following feeders only from Tons area as given below. 220kv Tons HPS-Rewackt-II 220kv Tons HPS-Kotarckt-II 20 MVA X-mer at Tons HPS 220kv Bus Tie at Tons HPS

There was No generationand load loss Supply to Tons HPS remain managedDG set

available as informed by Tons HPS. Later 20 MVA X-mer charged at 00.56 Hrs along with this otherelements restored gradually.

2. System Disturbance on 19.04.2018 in Ratlam area: On dated 19.04.2018 at around

08.00 Hrs. M.P system was normal and frequency of National Grid was 50.07 Hz. At 08.05 Hrs,220kv Bus Bar Protection maloperated due to 220kv bus tie master relay contact got shorted , this instance happened during opening of 132kv side of 160 MVA X-Mer-I for taking shutdown,resulting into tripping of following X-mers/ckts-

160 MVA , 220kv/132kv X-mer-II 160 MVA , 220kv/132kv X-mer-III 220kv Ratlam-Badnagarckt-I 220kv Ratlam-Badnagarckt-II 220kv Ratlam-Nagrackt-I 220kv Ratlam-Nagrackt-II 220kv Ratlam-Dalodackt 220kv Bus tie 220kv Bus coupler

This caused the No interruption in 220kv s/s Ratlam as supply was managed through 132kv network. Also there was no generation loss. Later the elements restored gradually.

Agenda of 64th OCC of MP 48

3. System Disturbance on 30.04.2018 in Tons HPS area: On dated 30.04.2018at around

09.40 Hrs. M.P system was normal and frequency of National Grid was 49.82 Hz, Thunderstorm was occurring at Tons Area. At 09.45 Hrs, Bus-Bar protection of Main Bus-II operated at Tons HPS, resulting in the tripping of following feeders only from Tons area as given below. 220kv Tons HPS-Rewackt-II 220kv Tons HPS-Kotarckt-II 20 MVA X-mer at Tons HPS 220kv Bus Tie at Tons HPS

There was No generation and load loss Supply to Tons HPS remain managed DG

set available as informed by Tons HPS. Later 20 MVA X-mer charged at 10.35 Hrs along with this other elements restored gradually.

4. System Disturbance on 03.05.2018 in Barwaha area: On dated 03.05.2018 at around 17:15 Hrs. M.P system was normal, Weather was Clear, frequency of National Grid was 50.06 Hz. At 17:21 Hrs,132kv B-ph CT of 132kv Barwaha-Sanawad-ckt burst at 220kv s./s Barwaha,resulting in the tripping of followingelementsas given below. 220kv/132kv 160MVA X-mer 220kv/132kv 3*40 MVA X-mer 132kv/33kv 63MVA , 40 MVA I & II X-mer 132kvBarwaha-Sanawadckt 132 kvBarwaha-ChhotiKhargoneckt 132 kvBarwaha-Kishangarhckt 132 kvBarwaha-Balwadackt 132 kvBarwaha-OSP Canalckt 132 kvBarwaha–Chhegaonckt 132 kvBarwaha-Simrolckt 132 kvBarwaha-Bhaklaickt

Interruption occurred at 220kv S/S Barwaha,132kv S/S Kishangarh, 132kv S/S Bhaklai. There was No generation and load loss was 55MW . 220kv/132kv 3*40 MVA X-mer charged at 17:30 hrs , later other elements got restored.

5. System Disturbance on 12.05.2018 in Sidhiarea: On dated 12.05.2018 at around

12:30 Hrs. M.P system was normal and frequency of National Grid was 49.85 Hz. At 12:36 Hrs, at loc no 134 B-ph jumper opened of 220kv Sidhi-Amarkantakckt, resulting into tripping of following X-mers/ckts-

220kv Rewa-Tons-ckt-I, 220KV Rewa-Birsinghpur, 220kv Sidhi-Amarkantakckt

Agenda of 64th OCC of MP 49

During the tripping 220kv Rewa-Tons-ckt-II was under shutdown, this caused theinterruption in 220kv Rewa s/s, 220 KV Sidhi S/S ,220kv Sirmour S/S, 132 KV Rewa S/S, 132 KV Sidhi S/S ,132 KV Deosar S/S, 132 KV Pahadiya S/S , 132 KV Mauganj S/S , 132 KV Mangawan S/S, 132 KV Katra S/S.There was no generation loss and load loss of 188MW.220kv Rewa-Tons ckt I charged at 13:00 hrs, 220KV Rewa-Birsinghpurckt charged at 13.09 hrs,later other elements restored gradually. 220kv Sidhi-Amarkantakckt restored after petrolling.

6. System Disturbance on 13.05.2018 in Binaarea: On dated 13.05.2018at around 21:00

Hrs. M.P system was normal and frequency of National Grid was 50.07 Hz, Stormy weather with heavy winds and rains was reported at Bina area. At 21.09 Hrs, 400kv JP Bina-Bina( PG) ckt tripped on B-Ph –E/F along with the following ckts 400kv JP Bina-Bina( MP) ckt 400kv Bina-Bhopal ckt -II Unit # 1 , Unit # 2 of JPBTPP BINA

There was generation Loss of 309 MW as both the units of JP Bina got tripped due to

no evacuation lines available and no load lossreported .400kv JP Bina-Bina( PG) cktcharged at 22.05 hrs and through this supply extended to JP BINA, later other lines got restored.

7. System Disturbance on 26.05.2018 in OSParea: On dated 26.05.2018 at around 17:45 Hrs. M.P system was normal and frequency of National Grid was 49.85 Hz. At 17.49 Hrs,while desynchronization of Unit # 2, the LBB protection of CB of unit # 2 got operated at OSP leading to the Bus Bar protection operation, due to this further following elements got tripped:- 220kv OSP-Khandwa(PG)ckt 220kv OSP-Chhegaonckt 220kv OSP-Barwaha Tap Nimranickt 220kv OSP-Julwaniyackt 220kv OSP-Barwahackt Three units of OSP i.eUnit # 2 , Unit #3, Unit #6

Agenda of 64th OCC of MP 50

There was generation loss of 174 MW and no load lossoccured. 220kv OSP-Barwahackt charged at 18.23 hrs, later other elements restored gradually

*********

Agenda of 64th OCC of MP 51

Agenda of 64th OCC of MP 52

Annexure-6.12A

Schemes of Western Region funded under PSDF

State I UT Sr. Details of the Scheme Nos. of Grant Date of Funds %age of

No. Schemes Sanctioned Sanction released fund

(in Rs (in Rs Crores) Disbursed

Crores) as on against

30.11.2016 Grant

sanctioned

Madhya 1. Implementation of 2 3.6 17/03/2016 0 0%

Pradesh Integrated system for

availability based

tariff. 92.7

2. Renovation and 17/03/2016 0 0%

Upgradation of

protection system of

substations of

MPPTCL

Madhya 3. Renovation and 2 47.11 5/9/2016 0 0%

Pradesh Upgradation of

protection system of

substations MPPGCL

4. Installation of 5.59 0 0%

125MVARBus

Reactor at SSTPP

Khandwaand

50MVARLine

Reactor at SGSTPS

Birsinghpur

substation of

MPPGCL.

Chhattisgarh 5. Renovation and 1 61.67 5/9/2016 0 0%

Upgradation of

protection system of

substations 1.50

Gujarat 6. Automatic Demand 3 11105/2015 1.35 89.82%

Management Scheme 3.70

17/03/2015

7. Load Forecasting 04/08/2015 0 0%

Scheme

8. Wind generation 1.62 17/03/2015 0 0%

forecasting project

for State of Gujarat.

TOTAL 8 217.49

Agenda of 64th OCC of MP 53

Annexure-6.12 (B) Reporting Format to the PSDF Project Monitoring Group

1. Name of the Scheme

1.1 Name of the substation and its Location

1.2 Executing Agency

1.3 State/Region

2. Date of Sanction Order

2.1 Date of Agreement of Entity with State Govt. / NLDC

2.2 Total Approved Cost of Scheme

2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)

2.4 Date of Requisition by the Entity

2.4 a) Date and Reference of LOA

2.4 b) Amount of LOA

2.5 Date of Disbursement and amount

2.5.1 Ist Installment

2.5.2 IInd Installment

2.5.3 IIIrd Installment

2.6 Date of Scheduled completion of work

2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Report for the Month of JANUARY 2017

Quantity CUMMULATIVE

PROGRESS till date

Qty. AS PER Received during

No. Supply Discription LOA Month Sch. Act. Balance Remark

1 Item Details (As per Annexure-II)

1.1

1.2

Erection Discription works as per Progress During CUMMULATIVE

Balance

LOA Month PROGRESS till date

2 Work Details

2.1

2.2

3 Others

Signature With Seal of The Nodal Officer

Agenda of 64th OCC of MP 54

ANNEXURE-6.14

YES/NOIF NOT COMMISSIONED THEN REASON

FOR NOT COMMISSIONINGYES/NO

IF NOT WORKING CONDITION THEN REASON FOR NOT

WORKINGYES/NO

IF NOT IN SERVICE CONDITION THEN REASON FOR NOT IN

SERVICE

RGMO COMMISSIONED WORKING CONDITION IN SERVICE

S.NO.NAME OF ELIGIBLE

UNITS

INSTALLED CAPACITY

IN MW

Agenda of 64th OCC of MP 55

Vol

tage

(kV

)R Y B Phase Voltage2018-06-14 15:25:00.000 - 2018-06-14 15:30:00.000

VRM SubstationId: BINA__MPDeviceId: 400BUS1______

VYM SubstationId: BINA__MPDeviceId: 400BUS1______

VBMSubstationId: BINA__MPDeviceId: 400BUS1______

15:25:00 15:25:30 15:26:00 15:26:30 15:27:00 15:27:30 15:28:00 15:28:30 15:29:00 15:29:30 15:30:00

234

236

232

238

Agenda of 64th OCC of MP 56

low dicpach
Typewritten Text
Annexure-6.15
low dicpach
Typewritten Text
low dicpach
Typewritten Text
low dicpach
Typewritten Text
low dicpach
Typewritten Text

Vol

tage

(kV

)R Y B Phase Voltage2018-06-14 15:25:00.000 - 2018-06-14 15:30:00.000

VRM SubstationId: BINA__MPDeviceId: 400BUS2______

VYM SubstationId: BINA__MPDeviceId: 400BUS2______

VBMSubstationId: BINA__MPDeviceId: 400BUS2______

15:25:00 15:25:30 15:26:00 15:26:30 15:27:00 15:27:30 15:28:00 15:28:30 15:29:00 15:29:30 15:30:00

235

230

232.5

237.5

Agenda of 64th OCC of MP 57

Vol

tage

(kV

)R Y B Phase Voltage2018-06-14 15:25:00.000 - 2018-06-14 15:30:00.000

VRM SubstationId: BINA__MPDeviceId: 400BINA_BPSCL1

VYM SubstationId: BINA__MPDeviceId: 400BINA_BPSCL1

VBMSubstationId: BINA__MPDeviceId: 400BINA_BPSCL1

15:25:00 15:25:30 15:26:00 15:26:30 15:27:00 15:27:30 15:28:00 15:28:30 15:29:00 15:29:30 15:30:00

0

2

4

Agenda of 64th OCC of MP 58

Annexure-8.1.i

SNO Meter No Location Feeder Name T & C Circle T & C Division Data Not Available Dates1 Y0515484 132KV S/S MANAWAR 132KV ULTRATECH FEEDER 400KV Indore Testing Division - II Indore 01/05/2018 to 31/05/2018

2 MPE51793 132KV S/S PITHAMPUR MVA 132/33KV X'MER-I BHEL S.NO. 20097 400KV Indore Testing Division - II Indore 01/05/2018 to 31/05/2018

3 MPE51761 132KV S/S AYODHYANAGAR BHOPAL 40MVA MAKE TELK SN 120459-16 BHOPAL 400 KV Testing Division Bhopal 01/05/2018 to 31/05/2018

4 MPE51976 132KV S/S BIORA 40MVA MAKE ABB SN 12020-014 BHOPAL Testing Division -I Bhopal-S/s DN Beora 01/05/2018 to 31/05/2018

5 XB577396 132KV S/S SHAMSHABAD 20MVA MAKE NGEF BHOPAL Testing Division -II Bhopal 01/05/2018 to 31/05/2018

6 MPE51945 132KV S/S MOTIZEEL 40 MVA MAKE BBL SN 4910/5 GWALIOR Testing Division -I Gwalior 03/05/2018 to 31/05/2018

7 MPE51950 132KV S/S TIGHRA 40 MVA MAKE BBL SN 4732/2 GWALIOR Testing Division -I Gwalior 01/05/2018 to 31/05/2018

8 APMB5072 220KV S/S MALANPUR SRF LIMITED GWALIOR Testing Division -II Gwalior 01/05/2018 to 31/05/2018

9 MPP28501 132KV S/S ALIRAJPUR 63MVA 132/33KV XMER BBL S.NO.5329/08 INDORE Testing Division - Rajgarh 01/05/2018 to 31/05/2018

10 MPE51649 132KV S/S KYMORE 40MVA MAKE EMCO SN 1864/13199 JABALPUR Testing Division -Katni 01/05/2018 to 31/05/2018

11 MPP28796 132KV S/S MUNGAOLI Tr. 132 KV TRACT.MUNGAOLI RAILWAY 400 KV Testing Division Bina 01/05/2018 to 31/05/2018

12 MPE51722 132KV S/S BIJAWAR 40MVA MAKE NGEF SN 5076/12 SAGAR Testing Division -II Sagar 01/05/2018 to 31/05/2018

13 MPP28381 132KV S/S PRITHVIPUR 63 MVA MAKE BBL SAGAR Testing Division -II Sagar 01/05/2018 to 31/05/2018

14 MPE51750 132KV S/S REWA 132 KV SATNA (for JP BELA Cement ) SATNA Testing Division - Rewa 01/05/2018 to 31/05/2018

15 Y0221275 132KV S/S BEOHARI 50 MVA X-mer SN 204292 SATNA Testing Division - Satna- S/S DN Shahdol 01/05/2018 to 31/05/2018

16 MPP28390 132KV S/S KOTMA 20 MVA NGEF MAKE SN 280016834 SATNA Testing Division - Satna- S/S DN Shahdol 01/05/2018 to 31/05/2018

17 MPE51662 132KV S/S BAIHAR BIRSA FEEDER/HCL MALAJKHAND SEONI Testing Division -II Chindwara 01/05/2018 to 31/05/2018

18 MPC58840 132KV S/S PANWADI 50MVA MAKE BBL SN 5406/02 UJJAIN Testing Division - Dewas 01/05/2018 to 31/05/2018

19 Y0221555 132KV S/S GAROTH 20MVA MAKE TELK SN 120255-1(R) UJJAIN Testing Division - Ratlam 01/05/2018 to 31/05/2018

20 MPE51892 132KV S/S MANASA 40MVA MAKE TELK S.NO.120271/3 UJJAIN Testing Division - Ratlam-S/S DN Neemuch 03/05/2018 to 31/05/2018

21 MPE51874 132KV S/S NEEMUCH 40MVA MAKE GEC SN B-27790 UJJAIN Testing Division - Ratlam-S/S DN Neemuch 01/05/2018 to 31/05/2018

22 MPP28660 132KV S/S INGORIYA 20MVA MAKE BHEL SN 6004701 UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

23 MPP28661 132KV S/S INGORIYA 20MVA MAKE APEX SN 891B/010 UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

24 MPE51895 132KV S/S TARANA 63MVA MAKE BBL TRANSFORMER UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

25 Y0221427 220KV S/S UJJAIN 40MVA MAKE CROMPTON SN T-8362/3 UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

26 MPE51809 220KV S/S S/Z, INDORE 0 MVA 132/33 KV XMAR-III CGL S.NO. 2479 400KV Indore 440 KV Testing Division, Indore 07/05/2018 to 31/05/201827 XC582184 132KV S/S BARWANI 40MVA 132/33KV XMER BBL S.NO.3072/1 400KV Indore Testing Division - II Indore 01/05/2018 to 10/05/201828 MPB98765 132KV S/S BETMA 40MVA 132/33KV X'MER BBL S.NO. 5033/27 400KV Indore Testing Division - II Indore 17/05/2018 to 31/05/201829 GEC08847 132KV S/S DEPALPUR 0 MVA CROMPTION MAKE SR .NO T8362/ INDORE Testing Division - I Indore 17/05/2018 to 31/05/201830 KA904776 132KV S/S GANJBASODA Tr.TRACTION BARETH-I RAILWAY Testing Division -II Bhopal 01/05/2018 to 06/05/201831 MPP28374 220KV S/S DAMOH IAMOND CEMENT FEEDER NARSINGGAR SAGAR Testing Division -II Sagar 26/05/2018 to 31/05/201832 MPP28355 132KV S/S KATRA 40MVA ECE MAKE XMER SATNA Testing Division - Rewa 17/05/2018 to 31/05/201833 MPE51863 132KV S/S KHATEGAON 40MVA BHEL X-mer S.NO. 2018175 UJJAIN Testing Division - Dewas 17/05/2018 to 31/05/2018

Agenda of 64th OCC of MP 59

Annexure-8.1.iiSNO Meter No Location Feeder Name T & C Circle T & C Division1 MP924834 132KV S/S KHURAI 40 MVA BHEL 400KV BINA 400 KV Testing Division Bina2 MPC58874 132KV S/S CHANDERI 20MVA EMCO SN 1023/10789 400KV BINA Testing Division Guna3 MPP28723 220 KV BINA DISCOM_33KV VIDISHA FEEDER ( EZ TO CZ) 400KV BINA 400KV Testing Division -BINA4 MPC57149 132KV S/S ANJAD 40MVA XMER BHEL S.NO. 2037088 400KV Indore Testing Division - II Indore5 MPE51799 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore6 GEC88970 220KV S/S HOSANGABAD SPM M/S SPM BHOPAL Testing Division Hoshangabad7 XB577467 132KV S/S BANKHEDI 40MVA MAKE IMP BHOPAL Testing Division Hoshangabad8 XB577430 132KV S/S SEMRI HARCHAND 40 MVA IMP PT6722 BHOPAL Testing Division Hoshangabad9 XB577404 220KV S/S PIPARIA 12.5MVA BHEL MAKE 6001776 BHOPAL Testing Division - Itarsi10 XB577379 132KV LATERI 40MVA IMP SN PT-7282 BHOPAL Testing Division -II Bhopal11 XB577712 132KV HASTINAPUR 40MVA BHEL SN 2037087 GWALIOR Testing Division -I GWL12 XB569562 132KV S/S BARODA 40MVA ABB GWALIOR Testing Division Guna-S/S Dn Shivpuri13 XB577730 220KV S/S DATIA 40MVA GWALIOR Testing Division -II Gwalior14 Y0221431 132KV S/S KARERA 20MVA BHEL MAKE SN 6004351 GWALIOR Testing Division Guna-S/S Dn Shivpuri15 XB577385 132KV S/S BADAGAON 40MVA IMP GWALIOR Testing Division -I Gwalior16 MSP56852 132KV S/S BANMORE 132 kv AMBA SHAKTI GWALIOR Testing Division -I Gwalior17 XB583341 132KV GOHAD 63 MVA MAKE IMP SN PT7479 GWALIOR Testing Division -II Gwalior18 MPP28712 132KV KOLARAS 20MVA CGL GWALIOR Testing Division -GUNA S/S Shivpuri19 MPE51942 132KV S/S MORAR 63 MVA MAKE BBL Sno. 5308/9 GWALIOR Testing Division -I Gwalior20 GEC88916 132KV S/S SENDHWA 20MVA CGL SN 24400 INDORE Testing Division - II Barwaha21 MPE51805 132KV S/S CHHANERA 20MVA MAKE CGL SN 24641 INDORE Testing Division - Khandwa22 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh23 MPC57146 132KV S/S ANJOD CH GANJ 40 MAVA BHEL INDORE Testing Division - I Indore24 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara25 MP925055 220KV S/S PANAGAR 220KV PANAGAR JABALPUR Testing Division - JABALPUR26 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara27 XB577406 132KV S/S BADGAON 40MVA BBL 5423/5 KHANDWA Testing Division - Khandwa28 MPE22595 132KV S/S JEERAPUR 20MVA NGEF RAJGARH Testing Division -I Bhopal-S/s DN Beora29 XB549199 132KV S/S DONGARITAL 20 MVA EMCO SN 1058 B/10930 REWA Testing Division - Rewa30 XB552535 132KV S/S SIRMOUR 40MVA IMP REWA Testing Division - Rewa31 MPC60964 132KV S/S DIGODA 20MVA SAGAR Testing Division -II Sagar32 MPC57148 132KV BUDERA 40MVA SAGAR Testing Division -II Sagar33 XB583338 132KV MUNGAOLI 63MVA SAGAR Testing Division -II SAGAR34 GEC88948 132KV S/S MAIHAR 132 KV RELIANCE FEEDER SATNA Testing Division - Satna35 MP924832 132KV S/S RAMPUR NAIKIN 40 MVA X-mer (33 kv side) SATNA Testing Division - Satna36 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol37 MPC58838 220KV S/S SIDHI 220KV S/S SIDHI SATNA Testing Division - Rewa38 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol39 XB577419 132KV S/S UMARIYA 20 MVA NGEF SATNA Testing Division - Rewa40 MPP28662 132KV S/S TARANA 20MVA MAKE GEC TRANSFORMER UJJAIN Testing Division - Ujjain41 MPC58871 132KV S/S MAXI 40MVA MAKE UJJAIN Testing Division - Dewas42 XB580676 132KV S/S BHERUGARH 63MVA MAKE IMP UJJAIN UJJAIN43 MP924841 220KV S/S SHANKARGARH 40MVA MAKE BHEL UJJAIN Testing Division - Dewas44 MP924848 132KV S/S BAROTHA 40MVA MAKE BHEL SN 2037 UJJAIN Testing Division - Dewas45 MPC58406 132KV SATWAS 40MVA MAKE BHEL SN 2037078 UJJAIN Testing Division - Dewas46 MPC58408 132KV SHAJAPUR 40MVA BHEL S.N. 2037089 UJJAIN Testing Division - Dewas47 XB593845 132KV NALKHEDA 40MVA ALSTOM S.N. B-30818 UJJAIN Testing Division - UJJAIN48 XB583619 132KV KALAPIPAL 40MVA TOSHIBA SN 90153 UJJAIN Testing Division - Shujalpur49 MPC58866 132KV PORSA 12.5MVA MAKE EMCO SN 969B/10463 GWALIOR Testing Division -I Gwalior, S/S DN Morena50 XB577443 132KV S/S BHERUGARH 40MVA MAKE BBL SN-4732/4 UJJAIN Testing Division - Ujjain51 MPC72357 132KV S/S SHIVANI 40 MVA XMER ALSTOM 400KV Indore Testing Division - II Indore52 BENEGAON_NEW 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara53 MPC74042 132KV TAMOT 40MVA MAKE CGL SN 24788 BPL Testing Division -II Bhopal54 XB577473 132KV S/S MAKSUDANGARH 63MVA MAKE BBL SN 5442/07 GWALIOR Testing Division Guna55 MPP08529 220KV S/S CHHEGAON MAKHA 63MVA 132/33KV BBL S.No. 5442/11 IND Testing Division - Khandwa56 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226 JBP Testing Division -Katni57 XC530817 132KV S/S LALBARRA 40MVA IMP JBP Testing Division -II Chindwara58 XC548595 132KV S/S UMRETH 40MVA BBL XMER JBP Testing Division -II Chindwara59 KA909252 132KV S/S LAUNDI 40MVA IMP SGR Testing Division -II Sagar60 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10 UJJ Testing Division - Ratlam61 XB577773 220KV S/S GWALIOR-II 40 MVA MAKE GWALIOR Testing Division -I Gwalior

List of newly commissioned substations / recently connected HT Consumers required to be included in supplementary list.

Agenda of 64th OCC of MP 60

62 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara63 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha64 XB560307 220KV S/S MUNGALIYA CHHAP 40MVA BHEL SN 2037622 BHOPAL Testing Division - I Bhopal65 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni66 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni67 MPP28396 132KV S/S KATRA 50MVA BHEL MAKE XMER SATNA Testing Division - Rewa68 XB577438 132KV S/S NAGOD 40 MVA X-mer SATNA Testing Division - Satna69 XC573291 132 KV ANDHAD 40MVA INDORE Testing Division - II Indore70 ESAGARH_NEW 132KV S/S ESAGARH_NEW 40MVA GWALIOR Testing Division Guna71 XB583342 132KV S/S KOTHIYA 20MVA GWALIOR Testing Division Guna72 XC573290 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam73 XB583343 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior74 JHABUA_NEW 132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore75 XB577383 132KV S/S GUDGAON 50MVA BHEL SN 2042484 BHOPAL Testing Division Itarsi76 MPP28696 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna-S/S Dn Shivpuri77 XB577374 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JBP Testing Division -II Chindwara78 MPC73878 132KV PANDHANA 63MVA IMP INDORE Testing Division KHANDWA79 XB577378 132KV S/S KASRAWAD 20MVA INDORE Testing Division - I Indore80 XB577371 220KV BHANPURA 50MVA BHEL SN 2042485 UJJAIN Testing Division - Neemuch81 XB577434 132KV S/S REWA-II 50MVA BHEL SATNA Testing Division - Rewa82 XB577412 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur83 Y0221147 220KV S/S CHICHLI 50MVA XMER MAKE BHEL SR. 2042480 JABALPUR Testing Division -II Jabalpur84 Y0221433 132KV S/S BARODA 40MVA NGEF GWALIOR Testing Division Guna-S/S Dn Shivpuri85 ICHHAWAR_NEW 132KV S/S ICHHAWAR 40MVA BBL SN 1448/3 BHOPAL Testing Division - I Bhopal86 SATWAS_NEW 132KV S/S SATWAS 20MVA NGEF SN 280002-2214 UJJAIN Testing Division - Dewas87 XB577472 220 KV S/S KOTAR 50MVA BHEL SATNA Testing Division - Satna88 XB569347 220KV S/S ANUPUR 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol89 MPC73830 132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha90 Y0062910 132KV S/S GADARWARA 132KV TC_NTPC JABALPUR Testing Division -II Jabalpur91 Y0221471 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch92 MPC73877 132KV S/S SINGHANA 40 MVA IMP INDORE Testing Division - II Indore93 XB552537 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas94 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena95 XB583344 132KV BHANDER 63MVA GWALIOR Testing Division DATIA96 MPM06716 220KV S/S RAJGARH BIAORA 20MVA BHOPAL Testing Division -I Bhopal-S/s DN Beora97 XC530820 132KV BAGRODA 40MVA BHOPAL Testing Division -I Bhopal98 MPC57144 132KV S/S RUNAHA 63MVA MAKE BBL SN 5308/10 BHOPAL Testing Division -II Bhopal99 MPC59988 220KV S/S BARNAGAR 40MVA MAKE BBL SN 3661/2 UJJAIN Testing Division - Ujjain100 XC559792 132KV S/S MORENA 40 MVA MAKE BBL SN 4910/7 GWALIOR Testing Division -I Gwalior, S/S DN Morena101 MPP28683 220KV S/S BINA 132KV BINA-BORL CKT-I 400KV BINA 400 KV Testing Division Bina102 MPP28684 220KV S/S BINA 132KV BINA-BORL CKT-II 400KV BINA 400 KV Testing Division Bina103 MPP28697 132KV S/S DABRA 63MVA MAKE BHEL SN 2042500 GWALIOR Testing Division -II Gwalior104 MPC58835 132KV S/S POLAIKALAN 20 MVA EMCO UJJAIN Testing Division - Shujalpur105 Y0221529 220KV S/S UJJAIN 63MVA MAKE BBL SN 5442/9 UJJAIN Testing Division - Ujjain106 MPM08323 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna107 MPC58403 132KV S/S PANSEMAL 40MVA BBL MAKE SN 5076/10 INDORE Testing Division - II Barwaha108 ABB06601 132KV S/S BALWADA 63MVA INDORE Testing Division - II Barwaha109 MPC75135 220KV S/S DHAR 132 KV VACMAT UJJAINI INDORE Testing Division - II Indore110 XC582192 132KV S/S SUSNER 50MVA BBL MAKE SN 5406/1 UJJAIN Testing Division - Ujjain111 Y0280030 132KV S/S AMLA Tr.132KV RLY. TR. BORDAHI_AMLA BHOPAL Testing Division - I Bhopal112 XB577712 132 KV S/s Hastinapur 40 MVA MAKE BHEL SN 2037087 GWALIOR Testing Division -I Gwalior113 XB583340 132KV S/S CHINNOR 50MVA MAAKE BBL SN 5406/04 GWALIOR Testing Division -II Gwalior114 Y0221830 132KV S/S Makdone 40 MVA BHEL UJJAIN Testing Division - Ujjain115 KAILARAS_NEW 132KV S/S KAILARAS 40 MVA GWALIOR Testing Division -I Gwalior116 RAHATGARH_NEW132KV S/S RAHTGARH 40 MVA SAGAR Testing Division -II SAGAR117 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -I Bhopal-S/s DN Beora118 MPC74039 220KV S/S PITHAMPUR 63MVA SEZ_II 400KV Indore Testing Division - II Indore119 X0209252 132KV S/S UMRETH 132KV Rly Trac.Umreth RAILWAY Testing Division -II Chindwara120 XC530820 132KV S/S BAGRODA 40MVA BHOPAL Testing Division -II Bhopal121 XB577480 220KV S/S GUNA 63MVA BBL SN 5442/10 400KV BINA Testing Division Guna122 BAROD_NEW 132KV S/S BAROD 40MVA BBL S.NO 5564/05 UJJAIN Testing Division - Ratlam123 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -II Bhopal124 PAWAI_NEW 132KV S/S PAWAI 40MVA BBL SAGAR Testing Division - Satna

Agenda of 64th OCC of MP 61

125 X0209247 220KV S/S NARSINGHPUR Tr.TRACTION-NARSINGHPUR RAILWAY Testing Division -Katni126 MPP28790 132KV S/S BANKHEDI 132KV RLY TRAC BANKHEDI RAILWAY Testing Division Itarsi127 MPC73855 132KV S/S ENTKHEDI 63 MVA BHOPAL Testing Division -II Bhopal128 MP925355 132KV S/S BARHI 40 MVA IMP JABALPUR Testing Division Katni129 Y0221370 132KV S/S INDERGARH 50 MVA BHEL GWALIOR Testing Division -II Gwalior130 BAIRAD_NEW 132KV S/S BAIRAD 40MVA BHOPAL Testing Division Guna-S/S Dn Shivpuri131 MADA_NEW 132KV S/S MADA 50MVA GWALIOR Testing Division Guna-S/S Dn Shivpuri132 BANDA_NEW 132KV S/S BANDA 50MVA BHEL SGR Testing Division -II Sagar133 KARPGAON_NEW 132KV S/S KARPGAON 50MVA BHEL JABALPUR Testing Division -II Jabalpur134 DEPALPUR__NEW 132KV S/S DEPALPUR 40MVA INDORE Testing Division - II Indore135 MP924845 220KV S/S MANGLIYA 63MVA INDORE Testing Division - I Indore136 X0363187 132KV KAPSI 63MVA GWL Testing Division - Guna137 UNHEL_NEW 132KV UNHEL 50MVA BBL UJJ Testing Division - Nagda138 JOBAT_NEW 132KV JOBAT 40MVA INDORE Testing Division RAJGARH

139 DEPALPUR_NEW 132KV S/S DEPALPUR 40 MVA BHEL INDORE Testing Division - I Indore140 ELECTRONIC COM 132KV S/S ELECTRONIC COMP63 MVA MAKE BHEL INDORE Testing Division - I Indore141 XD512310 220KV S/S BARWAHA 132KV OSP CANAL FEEDER IND Testing Division - II Barwaha142 SINGOT_NEW 132KV SINGOT 40MVA IND Testing Division - Khandwa143 RAJGARH_NEW 132KV S/S RAJGARH 40MVA 132/33KV X'MER IMP SN PT-7562 IND Testing Division - Rajgarh144 HATTA_NEW 132KV S/S HATTA 20MVA 132/33KV X'MER NGEF SN 2800034786 IND Testing Division - Rajgarh145 Y0221822 132KV S/S BIORA 40MVA BPL Testing Division -I Bhopal-S/s DN Beora

Agenda of 64th OCC of MP 62

Annexure-8.1.iii

132KV 466190.00 468345.00 4.00 0.00 8620.00 17.00 17.00 4.00 0.0033 KV 452973.00 457359.00 2.00 0.00 8772.00 701.00 701.00 0.67 0.00 0.00132 KV 340202.00 342884.00 1.00 0.00 2682.00 215.00 215.00 1.00 0.0033 KV 1435473.00 1446811.00 0.24 0.00 2721.12 485.00 485.00 1.33 0.00132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV

33 KV

132KV33 KV

132 KV

33KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV

21 40MVA 132/33K Xmer I

20

13

40MVA 132/33K Xmer-II

18Ichhawar

Khilchipur

Sehore

50MVA 132/33K Xmer-II

20MVA 132/33K Xmer-I

16

63MVA 132/33K Xmer-II

63MVA 132/33K Xmer-I

20MVA 132/33K Xmer-I

14

15

Ashta

12.5MVA 132/33K Xmer

Sarangpur

Pachore

50MVA 132/33K Xmer-I

20MVA 132/33K Xmer

3

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer II

4

IMPORT

CONSUMPTION (MWH)

63MVA 132/33K Xmer-I

Bhopal Lalghati 63MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-III

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

5

6

11

10

9

12

7

8

1

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

50MVA 132/33KV Xmer IBairagarh Bhopal 220

2

EXPORT

PREVIOUS READING WITH TIME & DATE

17

22

19

40MVA 132/33K Xmer

PREVIOUS READING

WITH TIME & DATE

T&C CIRCLE BHOPAL :-

20MVA 132/33KV Xmer II

40MVA 132/33K Xmer-I

Kurawar

Biaora

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer-II

REMARKS

Agenda of 64th OCC of MP 63

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

Mandideep 220

2520MVA 132/33K Xmer

24

23 40MVA 132/33K XmerShyampur

Rajgarh

24

40MVA 132/33K Xmer

20MVA 132/33K Xmer

40MVA 132/33K XmerJeerapur

Mugaliyachaap 40MVA 132/33K Xmer

40MVA 132/33K Xmer

26

26

20MVA 132/33K Xmer

Agenda of 64th OCC of MP 64

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV

132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

132KV

33 KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV

40 MVA 132/33KV Xmer-II

Bhopal MACT 40MVA 132/33K Xmer-II

30

28

38

27

Vidisha63MVA 132/33K Xmer 2

63 MVA 132/33K Xmer 1

37

31

29

32

34

40 40MVA(TELK) 132/33K Xmer

35

Beresia

Bareli

Raisen

42

36

39

41

43

44

45

Sironj

46Nasrullaganj

47

33

40MVA 132/33K Xmer II

GanjBasoda20MVA 132/33K Xmer

Mandideep 13240MVA 132/33K Xmer-II

Runha

20MVA 132/33K Xmer-I

63MVA 132/33K Xmer

20MVA 132/33K Xmer I

40 MVA 132/33K Xmer II

16MVA 132/33K Xmer-III

40MVA 132/33K Xmer I

20 MVA 132/33K Xmer-I

63 MVA 132/33K Xmer-III

40MVA 132/33K Xmer

40MVA(EMCO)132/33K Xmer 2

40MVA 132/33K Xmer

40MVA 132/33K Xmer-I

50MVA 132/33K Xmer 1

20MVA 132/33K Xmer-II

63MVA 132/33K Xmer-I

Agenda of 64th OCC of MP 65

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

33 KV132KV33 KV132KV33 KV

132KV

33 KV132KV33 KV

132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

Shamshabad

47

48

52

51

51

50

50

Gopalpur

49

40MVA 132/33K Xmer II

63MVA 132/33K Xmer

49

Gairatganj

Lateri

20MVA 132/33K Xmer-II

20MVA 132/33K Xmer

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

Sarni 220

Itarsi 220

Agenda of 64th OCC of MP 66

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33KV

132KV

33KV

132KV

33KV

132KV

33KV

132KV

58

53

54

61

63

56

57

64

67

55

69

70

40MVA 132/33KV X-MER

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer

40MVA 132/33K Xmer

20MVA 132/33K Xmer

50 MVA 132/33K Xmer

40MVA 132/33K Xmer

60

62

59

63

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-IIBetul

63 MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-I

Multai

40MVA 132/33K Xmer

40MVA 132/33K Xmer-II

50MVA 132/33K XmerGudgaon

Hoshangabad

20MVA 132/33K Xmer

63MVA 132/33K Xmer-I

40MVA 132/33K Xmer-I

Amla 132 40MVA 132/33KV X-MER

Seoni Malwa

Pipariya 132

Chicholi 132

Pipariya 220

40MVA 132/33KV X-MER

Bankhedi 132

63MVA 132/33KV X-MER

69

66

65

Harda

Sultanpur 132 40MVA 132/33KV X-MER

67

68

Betul 220

Agenda of 64th OCC of MP 67

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

33KV

132KV

33KV

72 132KV

33KV

132KV

33KV

70 63MVA 132/33K Xmer 132KV33 KV

71 40MVA 132/33K Xmer 132KV

33 KV72 63MVA 132/33K Xmer-I 132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

51 Entekhedi 63MVA 132/33K Xmer

72

74

73

73

70

71

40MVA 132/33KV X-MER

20MVA 132/33K Xmer

40MVA 132/33KV X-MER

Khirkiya 132 40MVA 132/33KV X-MER

40MVA 132/33K Xmer

Bhopal Chambal

40MVA 132/33K Xmer

20MVA 132/33K Xmer

Ayodhya

40MVA 132/33K Xmer

63MVA 132/33K XmerAmarawat Khurd Bhopal

Semriharchand 132

76

81

82

Bagroda

Shahganj

SHAMSHABAD

40MVA 132/33K Xmer

75

20MVA 132/33K Xmer

78 Saharwasa 40MVA 132/33K Xmer

50 Salamatpur

Tamot

40MVA 132/33K Xmer

77

Sultanpur 132 40MVA 132/33KV X MER

Agenda of 64th OCC of MP 68

THESE THREE S/S TELEMETRY IS OUT SINCE LONG TIME1 MORWA 132 KV

1 ALL T.M. DATA CB ,MW,MVAR N/A2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 220 KV INTERCONNECTOR 2 CB FAULTY CLOSE2 220 KV TRACTION 1 CB FAULTY CLOSE

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED2 132 KV ANUPPUR 1 CB FAULTY

KOTMA 132 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SATNA CIRCLE

BIRSINGHPUR 220 KV S/S

BEOHARI 132KV S/S

Agenda of 64th OCC of MP 69

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site

1 132/33 KV XMER 2 MW/MVAR N/A2 220 KV PGCIL 1 & 2 MW/MVAR N/A 70/15

SEONI CIRCLE

SEONI 220 KV S/S

Agenda of 64th OCC of MP 70

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220/132 KV 160 MVA XMER(HV) CB FAULTY CLOSE

1 220 KV BUS TIE CB FAULTY CLOSE2 132/33KV 20 MVA XMER MW/MVAR NON CURRENT

1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES2 315MVA X-MER-1 MW/MVAR WRONG VALUES3 400 KV BUS COUPLER CB FAULTY

1 33 KV ICHAWAR 1 CB FAULTY

1 220 KV MANDIDEEP CB FAULTY CLOSE

1 132 CHANERA(RLY.TRAC.-2) CB FAULTY CLOSE2 132 KHIRKIYARLY.TRAC.-1 CB FAULTY CLOSE

HARDA 132 KV S/S

21-06-2018SARNI 220 KV S/S

RAJGARH 220 KV S/S

ASHTA 400 KV S/S

ICHAWAR 132 KV S/S

HOSANGABAD 220 KV S/S

Agenda of 64th OCC of MP 71

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400KV BINA-2 CB OPEN CLOSE2 80 MVAR REACTOR-1 CB FAULTY CLOSE3 220KV BHOPAL-2 CB NON CURRENT CLOSE4 315MVA X-MER -4 TIE CB FAULTY5 80 MVAR REACTOR-1 TIE CB CB FAULTY CLOSE6 80 MVAR REACTOR-2 CB FAULTY OPEN7 315MVA X-MER -4 HV & LV CB FAULTY CLOSE

22-06-2018BHOPAL 4000 KV S/S

Agenda of 64th OCC of MP 72

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 132 KV BUS COUPLER-1 MW/MVAR NON CURRENT2 132 KV BUS COUPLER-1 CB FAULTY OPEN

1 132 KV BUS VOLTAGE WRONG VALUES2 132 KB BASAI-1 & 2 CB FAULTY CLOSE

1 132 KV BUS COUPLER MW/MVAR NON CURRENT

1 132 KV BARODA MW/MVAR WRONG VALUES

23-06-2018

MALANPUR 220 KV S/S

PICHORE 132 KV S/S

SHIVPURI 220 KV S/S

SHOEPURKALAN 132 KV S/S

Agenda of 64th OCC of MP 73

1 220/132 160 MVA X-Mer-I CB Faulty Close2 220/132 160 MVA X-Mer-II CB Open Close3 220 Kv Ujjain -II CKT CB Faulty Close4 220/132 160 MVA X-Mer-II CB Open Close5 132 Kv RLY Traction-II CB Open Close6 132 kv Bus coupler CB faulty Close7 132 Depalpur Ckt-II CB Open Close8 132 kv Sanwer Ckt CB Open Close9 132 kv Ujjain Ckt CB Close Open

1 132 KV INTC-I CB FAULTY CLOSE

1 220/132kV 160MVA TRF-1(SEC SIDE) CB FAULTY CLOSE

1 220/132 TR4(SECONDARY SIDE) CB FAULTY2 132KV BUS COUPLER CB FAULTY CLOSE3 132KV BUS COUPLER CB FAULTY CLOSE

1 220/132 160 MVA XMER-2 CB OPEN CIOSE2 33 Kv Bus coupler CB Faulty open3 132/33 KV 50 MVA XMER 33 SIDE MW,MVAR NOT COMING

220KV S/s DHAR2 132KVRAJGHARH CB Faulty CLOSE3 132/33KV TRF -1 LV side CB Faulty CLOSE4 132/33KV TRF -4 LV Side CB Faulty CLOSE5 33 KV AAHU CKT CB Faulty CLOSE6 33KV Tees gaon CB Faulty OPEN7 33KV Berchha CB Faulty CLOSE

1 132/33KV 40MVA TRF-I CB Faulty CLOSE

132 KV S/S CHHEGAONSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNIMRANI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE SZ 220KV S/S

SOE Data are coming.NEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S-II

INDORE NZ (JETPURA) 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDPITAMPUR 220 KV S/S Sector-III

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 64th OCC of MP 74

1 132kV Shajapur CB faulty closeMAKSI 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S JAORASOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S SAILANASOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

GHOSLA 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 64th OCC of MP 75

2 132KV RAILWAY TRAC 2 MW,MVAR NOT COMINGSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

3 132/33KV 63MVA TRF-2 CB FOULTY CLOSE

132 KV S/S CHHEGAONSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S BAHADURPUR

NIMRANI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 64th OCC of MP 76

1 220/132 KV X-mer -IV CB Open CLOSE2 400/220KV 315MVA TRF-4 CB OPEN CLOSE

1 132kV Khachrod MW,MVAR Not coming2 33KV Unhel MW,MVAR Not coming2 132kV INTCC MW,MVAR Not coming

1

1 220 Kv Nagda Ckt -II CB Faulty Close

1 33 KV Bus Coupler CB Faulty open

1 132KV BUS -2 FREQ N/C

2 132KV CHAYAN CB FAULTY OPEN3 132KV SARJAN CB OPEN CLOSE4 220KV BUS-2 KV HZ5 33KV DISCOM-II CB FAULTY OPEN6 33KV BADNAWER CB OPEN CLOSE7 33KV CAP. BANK II CB FAULTY OPEN8 12+5 MVAR CAP. BANK CB FAULTY OPEN

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S JAORA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S SAILANA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S BADNAGAR

N/C

220 Kv S/S NAGRA

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S KACHROD

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S Polykalan

All Lines and X-mers data jump 6 times to orignal dataSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

220 KV S/S RATLAMSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 64th OCC of MP 77

9 6MVAR CAP. BANK CB FAULTY OPEN10 33KV BUS COUPLER CB FAULTY OPEN

1 33KV CAP BANK CB FAULTY CLOSE2 33KV DELIGENTIA-1 CB FAULTY CLOSE3 132KV BUS COUPLER CB FAULTY OPEN4

1 33KV UJAAS-2 CB OPEN CLOSE2 33KV DEEPAKHEDA CB OPEN CLOSE

1 132kV Buscoupler CB Faulty Close2 33KV CAP BANK-2 CB Faulty Close3 33KV BUS CUPLER CB Faulty Close

1 33KV CAP BANK-2 CB Faulty OPEN

1 33KV SARANGPUR CB FAULTY CLOSED2 132/33KVTRF-1 SEC. CB FAULTY CLOSED3 33KV BAHARWAL CB FAULTY CLOSED4 33KV BUS COUPLER CB FAULTY CLOSED5 33KV INDUSTRIAL-2 CB FAULTY CLOSED

1 132KV SHAJAPUR CB FAULTY CLOSED

MAKDONE 132KV SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S AGAR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGHOSLA 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SHUJALPURR132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDMAKSI 132 KV S/S

132 KV S/S SITAMAU

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S RATANGARH

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 64th OCC of MP 78

12 33KV CAP BANK-2 CB FAULTY FAULTY

1 132/33KV 50MVATRF CB CLOSED OPEN

132KV ALOT

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132KV BAHADARPUR

Agenda of 64th OCC of MP 79

1 ISP-INDORE 400KV 1 & 2 MVAR 200 202 ISP-NAGDA 400 KV MVAR 583 58

ISP H P S

Agenda of 64th OCC of MP 80

Name at SLDC end at site end

1 GEN 6 GT MW/MVAR 0 155 /102 GEN 7 GT MW/MVAR 0 160/103 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE6 220 KV ITARSI 2 MW/MVAR 165/1 32/07 220 KV SARNI 1 MW/MVAR 6/2 60/108 ALL 220 KV FEEDER CB FAULTY

1 STATION XMER 5A & 5B CB N/A2 132/33 AUTO XMER CB N/A

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT P & S (BOTH SIDE) CB FAULTY CLOSE2 400 KV STN TRANSFORMER A & B CB NA CLOSE3 STN TR 1 ,2 (220 KV ) CB NA CLOSE4 220 KV BUS TIE CB NA CLOSE

5 220 /33 KV TR CB/MW/MVAR NA

6 GEN 1 CB FAULTY CLOSE7 400 KV BUS 1 FREQ 49.79 49.988 220 KV BUS 2 VOLTAGE 264 2309 220 KV PANAGAR CB FAULTY CLOSE

10 220 KV ATPS 2 CB FAULTY CLOSE11 220 KV SHAHDOL CB FAULTY CLOSE

1 GEN 4 CB FAULTY CLOSE

1 GEN 3 CB OPEN CLOSERAJGHAT H P S

SATPURA T P S

AMARKANTAK TPS

SINGHA JI S T P S

S G T P S

GANDHI SAGAR H P S

Agenda of 64th OCC of MP 81