148
DETAIL OF MATERIAL REQUIRED S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT 1 PCC POLE 9Mtr.LONG NO. 2 2170 4340 2 DISTRIBUTION T/F 25 KVA NO. 1 48000 48000 3 PLATFORM SET SET 1 3060 3060 4 J BOLT SET SET 1 382 382 5 11KV G.O SWITCH NO. 1 5454 5454 6 11KV DISC INSULATOR with fitting NO. 6 331 1986 7 11 KV PIN INSULATOR NO. 6 44 264 8 11 KV PIN ONLY K.G 6 52 312 9 V SHAPE X-ARE NO. 0 929 0 10 11KV TOP HAMPER NO. 0 260 0 11 ACSR CONDUCTOR 3 SWG MTR. 250 27 6750 12 G.S.L 8SWG K.G 15 55 825 13 STAY SET COMPLETE NO. 3 702 2106 14 STAY WIRE 7/8 SWG K.G 24 52 1248 15 4 CORE CABLE MTR. 15 84 1260 16 M.S ANGLE IRON K.G 50 52 2600 17 M.S CHANNEL K.G 70 51 3570 18 M.S.FLATE K.G 32 51 1632 19 M.S NUT & BOLT K.G 15 55 825 20 11KV L/ARRESTOR SET 1 2420 2420 21 EARTHING SET NO. 3 335 1005 22 OPEN TYPE FUSE SYSTEM NO. 1 550 550 23 3 PHASE,4WIRE,ENERGY METER NO. 1 1810 1810 24 MS X PLATE NO. 3 350 1050 25 EGG INSULATOR NO. 3 18 54 26 SUNDRIES FOR COMPLITION OF WORK 1873 93376 TOTAL CONTIGENCY + TRANSPORTATION 3.5% 3268 LABOUR CHARGES (detail overleaf) 3356 G.TOTAL 100000 SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

Transcript of 33 KV EStt

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 2170 43402 DISTRIBUTION T/F 25 KVA NO. 1 48000 480003 PLATFORM SET SET 1 3060 30604 J BOLT SET SET 1 382 3825 11KV G.O SWITCH NO. 1 5454 54546 11KV DISC INSULATOR with fitting NO. 6 331 19867 11 KV PIN INSULATOR NO. 6 44 2648 11 KV PIN ONLY K.G 6 52 3129 V SHAPE X-ARE NO. 0 929 010 11KV TOP HAMPER NO. 0 260 011 ACSR CONDUCTOR 3 SWG MTR. 250 27 675012 G.S.L 8SWG K.G 15 55 82513 STAY SET COMPLETE NO. 3 702 210614 STAY WIRE 7/8 SWG K.G 24 52 124815 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 50 52 260017 M.S CHANNEL K.G 70 51 357018 M.S.FLATE K.G 32 51 163219 M.S NUT & BOLT K.G 15 55 82520 11KV L/ARRESTOR SET 1 2420 242021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 3 PHASE,4WIRE,ENERGY METER NO. 1 1810 181024 MS X PLATE NO. 3 350 105025 EGG INSULATOR NO. 3 18 5426 SUNDRIES FOR COMPLITION OF WORK 1873

93376

TOTALCONTIGENCY +TRANSPORTATION 3.5% 3268LABOUR CHARGES (detail overleaf) 3356

G.TOTAL 100000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 0 90 0

3 E/O OF STAY SET NO. 1 30 30

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF CABLE MTR. 15 52 52

6 E & SAGGING OF ACSR MTR. 250 220 /K.M 55

7 E/O 25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 962

ADD 250% PREMIUM 2394

G.TOTAL 3356

SAY Rs. 3356

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 3 1590 47702 DISTRIBUTION T/F 25 KVA NO. 1 56352 563523 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 6 331 19867 11 KV PIN INSULATOR NO. 9 44 3968 11 KV PIN ONLY K.G 9 52 4689 V SHAPE X-ARE NO. 1 929 92910 11KV TOP HAMPER NO. 1 260 26011 ACSR CONDUCTOR 6SWG MTR. 450 17 765012 G.S.L 8SWG K.G 15 49 73513 STAY SET COMPLETE NO. 3 565 169514 STAY WIRE 7/8 SWG K.G 24 52 124815 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 50 37 185017 M.S CHANNEL K.G 70 36 252018 M.S.FLATE K.G 32 38 121619 M.S NUT & BOLT K.G 22 55 121020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 3 PHASE,4WIRE,ENERGY METER NO. 1 1810 181024 SUNDRIES FOR COMPLITION OF WORK 619

98739

TOTALCONTIGENCY +TRANSPORTATION 3.5% 3456LABOUR CHARGES (detail overleaf) 3805

G.TOTAL 106000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 1 90 90

3 E/O OF STAY SET NO. 1 30 30

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF CABLE MTR. 15 52 52

6 E & SAGGING OF ACSR MTR. 450 200 /K.M 90

7 E/O 25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 1087

ADD 250% PREMIUM 2718

G.TOTAL 3805

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 4 1590 63602 DISTRIBUTION T/F 25 KVA NO. 1 56352 563523 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 6 331 19867 11 KV PIN INSULATOR NO. 12 44 5288 11 KV PIN ONLY K.G 12 52 6249 V SHAPE X-ARE NO. 2 929 185810 11KV TOP HAMPER NO. 2 260 52011 ACSR CONDUCTOR 6SWG MTR. 700 17 1190012 G.S.L 8SWG K.G 30 49 147013 STAY SET COMPLETE NO. 3 565 169514 STAY WIRE 7/8 SWG K.G 24 52 124815 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 50 37 185017 M.S CHANNEL K.G 70 36 252018 M.S.FLATE K.G 32 38 121619 M.S NUT & BOLT K.G 20 55 110020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 3 PHASE,4WIRE,ENERGY METER NO. 1 1810 181024 SUNDRIES FOR COMPLITION OF WORK 899

106961

TOTALCONTIGENCY +TRANSPORTATION 3.5% 3744LABOUR CHARGES (detail overleaf) 4295

G.TOTAL 115000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 2 90 180

3 E/O OF STAY SET NO. 1 30 30

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF CABLE MTR. 15 52 52

6 E & SAGGING OF ACSR MTR. 700 200 /K.M 140

7 E/O 25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 1227

ADD 250% PREMIUM 3068

G.TOTAL 4295

SAY Rs. 4295

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 5 1590 79502 DISTRIBUTION T/F 25 KVA NO. 1 56352 563523 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 6 331 19867 11 KV PIN INSULATOR NO. 15 44 6608 11 KV PIN ONLY K.G 15 52 7809 V SHAPE X-ARE NO. 3 929 278710 11KV TOP HAMPER NO. 3 260 78011 ACSR CONDUCTOR 6SWG MTR. 900 17 1530012 G.S.L 8SWG K.G 50 49 245013 STAY SET COMPLETE NO. 3 565 169514 STAY WIRE 7/8 SWG K.G 24 52 124815 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 50 37 185017 M.S CHANNEL K.G 70 36 252018 M.S.FLATE K.G 32 38 121619 M.S NUT & BOLT K.G 15 55 82520 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 3 PHASE,4WIRE,ENERGY METER NO. 1 1810 181024 SUNDRIES FOR COMPLITION OF WORK 1017

114251

TOTALCONTIGENCY +TRANSPORTATION 3.5% 3999LABOUR CHARGES (detail overleaf) 4750

G.TOTAL 123000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 3 90 270

3 E/O OF STAY SET NO. 1 30 30

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF CABLE MTR. 15 52 52

6 E & SAGGING OF ACSR MTR. 900 200 /K.M 180

7 E/O 25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 1357

ADD 250% PREMIUM 3393

G.TOTAL 4750

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 1590 31802 DISTRIBUTION T/F 25 KVA NO. 1 56352 563523 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 6 331 19867 11 KV PIN INSULATOR NO. 9 44 3968 11 KV PIN ONLY K.G 9 52 4689 V SHAPE X-ARE NO. 0 929 010 11KV TOP HAMPER NO. 0 260 011 ACSR CONDUCTOR 6SWG MTR. 50 17 85012 G.S.L 8SWG K.G 10 49 49013 STAY SET COMPLETE NO. 0 565 014 STAY WIRE 7/8 SWG K.G 0 52 015 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 50 37 185017 M.S CHANNEL K.G 70 36 252018 M.S.FLATE K.G 32 38 121619 M.S NUT & BOLT K.G 15 55 82520 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 3 PHASE,4WIRE,ENERGY METER NO. 1 1810 181024 SUNDRIES FOR COMPLITION OF WORK 516

85484

TOTALCONTIGENCY +TRANSPORTATION 3.5% 2992LABOUR CHARGES (detail overleaf) 3524

G.TOTAL 92000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 1 90 90

3 E/O OF STAY SET NO. 1 30 30

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF CABLE MTR. 15 52 52

6 E & SAGGING OF ACSR MTR. 50 200 /K.M 10

7 E/O 25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 1007

ADD 250% PREMIUM 2517

G.TOTAL 3524

SAY Rs. 3524

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 25 KVA T/F NO. 1 60000 600002 4 CORE CABLE MTR. 20 84 1680

TOTAL 61680

CONTIGENCY +TRANSPORTATION 5% 3084LABOUR CHARGES (detail given below) 2520

G.TOTAL 67284

Detail of Labour Charges1 D/O Existing 1 No:T/F @ 240 = 2402 E/O Existing 1 No:T/F @ 480 = 480 Sub -Total = 720 Add. 250 % Premium =1800 Total = 2520

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 11 kv AB Cable Straight through Joint 3*35 NO. 1 7000 70002 Sundries to Complete the job job 1 100 100

TOTAL 7100

CONTIGENCY +TRANSPORTATION 5% 249LABOUR CHARGES (detail given below) 1050 G.TOTAL 8399

Detail of Labour Charges1 Filling of JOINT 1 No:@300= 300 Add. 250 % Premium = 750 Total = 1050

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 11 kv AB Cable Box 3*185 mm2 NO. 1 8200 82002 Sundries to Complete the job job 1 100 100

TOTAL 8300

CONTIGENCY +TRANSPORTATION 3.5% 214LABOUR CHARGES (detail given below) 1050 G.TOTAL 9564

Detail of Labour Charges1 Filling of JOINT 1 No:@300= 300 Add. 250 % Premium = 750 Total = 1050

SDO,MT SUB.DIVIN. UHBVNL,Karnal

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 LT AB CABLE, 3C x 120+95+16 mm2 MTR. 4500 210 9450002 SUSPENSION CLAMP NO. 66 225 148503 TENSION CLAMP NO. 40 400 160004 NUT & BOLT KG 100 56 56005 GSL 8 SWG KG 500 44 220006 AB CABLE BOX NO. 8 1220 97607 ST. THROUGH JOINT NO. 24 625 15000

SUNDRIES FOR COMPLITION OF WORK 5041028714

TOTALCONTIGENCY +TRANSPORTATION 5% 51436LABOUR CHARGES (detail overleaf) 115500

G.TOTAL 1195650

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 FILLING OF CABLE BOX/ JOINT NO. 32 300 9600

4 E/O OF CABLE MTR. 4500 5 22500

5 D /O OF ACSR MTR. 9000 100 /K.M 900

TOTAL 33000

ADD 250% PREMIUM 82500

G.TOTAL 115500

SAY Rs. 115500

SDO (OP) SUB.DIVIN.

UHBVN, NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 11 kv AB Cable Straight through Joint 3*185 NO. 1 8200 8200

S.TOTAL 8200

VAT Extra 5.25 % 431 G.TOTAL 8631

SDO,(op) SUB.DIVIN. UHBVNL,INDRI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 D/O H POLE WITH 2 STAY NO. 1 82.5 82.5

2 E/O OF PCC POLE 9MTR. NO. 2 90 180

3 E/O OF STAY SET NO. 2 30 60

4 E & SAGGING OF ACSR MTR. 100 200 /K.M 20

5 E/O L / ARRESTOR SET 1 100 100

TOTAL 442.5

ADD 250% PREMIUM 1106

G.TOTAL 1548

SAY Rs. 1548

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 GI Pipe 4.5 mtr. Long 40 mm2 NO. 6 2300 138002 Charcoal, kg 250 20 15003 Salt kg 225 5 3854 Sundries to complete the job 6 195.4 1172

TOTAL 16857

CONTIGENCY +TRANSPORTATION 5% 843LABOUR CHARGES (detail given below) 6300 G.TOTAL 24000

Detail of Labour Charges1 Boring & Digging of pipe 6 No:@300= 1800 Add. 250 % Premium = 4500 Total = 6300

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 9 1590 143102 DISTRIBUTION T/F 25 KVA,(Single Phase NO. 1 55000 550003 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 5 331 16557 11 KV PIN INSULATOR NO. 27 44 11888 11 KV PIN ONLY K.G 27 52 14049 V SHAPE X-ARE NO. 7 929 650310 11KV TOP HAMPER NO. 7 260 182011 ACSR CONDUCTOR 6SWG MTR. 4500 17 7650012 G.S.L 8SWG K.G 50 49 245013 STAY SET COMPLETE NO. 3 565 169514 STAY WIRE 7/8 SWG K.G 24 52 124815 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 40 37 148017 M.S CHANNEL K.G 70 36 252018 M.S.FLATE K.G 30 38 114019 M.S NUT & BOLT K.G 15 55 82520 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 550

SUNDRIES TO COMPLETE THE JOB 513183276

TOTALCONTIGENCY +TRANSPORTATION 5% 9164LABOUR CHARGES (detail overleaf) 3560

G.TOTAL 196000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 ASCR, 50 mm2 Mtr 700 28 196002 11 kv Pin Insulator No. 10 30 3004 Sundries to complete the job 600

TOTAL 20500

CONTIGENCY +TRANSPORTATION 3.5% 718LABOUR CHARGES (detail given below) 700 G.TOTAL 21918

Detail of Labour Charges

1 D/O ASCR 600 mtr@100/km = 60

2 E/O ASCR 700 mtr@100/km = 140

Add. 250 % Premium = 500

Total = 700

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 3 1590 47702 DISTRIBUTION T/F 16 KVA NO. 1 85000 850003 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 5000 50006 11KV DISC INSULATOR with fitting NO. 9 331 29797 11 KV PIN INSULATOR NO. 9 44 3968 11 KV PIN ONLY K.G 9 52 4689 V SHAPE X-ARM NO. 1 929 92910 11KV TOP HAMPER NO. 1 260 26011 ACSR CONDUCTOR 3SWG MTR. 500 25 1250012 G.S.L 8SWG K.G 20 49 98013 STAY SET COMPLETE NO. 3 565 169514 STAY WIRE 7/8 SWG K.G 30 52 156015 4 CORE CABLE MTR. 15 95 142516 M.S ANGLE IRON K.G 40 48 192017 M.S CHANNEL K.G 80 48 384018 M.S.FLATE K.G 40 48 192019 M.S NUT & BOLT K.G 15 60 90020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 3 Phase,4 Wire Elec.Meter NO. 1 4000 400024 SUNDRIES TO COMPLETE THE JOB 409

S.TOTAL 138105

CONTIGENCY +TRANSPORTATION 5% 6905LABOUR CHARGES (detail overleaf) 3840

G.TOTAL 148850

SDO (OP) SUB.DIVIN. UHBVNL,NIOLKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 17 1590 270302 SUSPENSION CLAMP NO. 16 110 17603 TENSION CLAMP NO. 4 130 5204 EYE BOLT NO. 16 36 5765 11KV G.O SWITCH NO. 2 4611 92226 11 KV AB CABLE 185 MM2 MTR. 600 563 3378007 11 KV AB CABLE BOX 185 MM2 NO. 6 625 37508 XLPE CABLE BOX 185 MM2 OUTDOOR NO. 3 1120 33609 XLPE CABLE BOX 185 MM2 INDOOR NO. 3 960 288010 STRAIGHT TH. JOINT NO. 9 625 562511 11 XLPE U/G CABLE 3*300 MM2 MTR. 650 715.4 46501012 STAY SET COMPLETE NO. 4 521 208413 STAY WIRE 7/8 SWG K.G 40 46 184014 M.S NUT & BOLT K.G 15 44 66015 EARTHING SET NO. 4 233 932

SUNDRIES FOR COMPLITION OF WORK 4951SUB TOTAL 868000

ERRECTION CHARGES @ 10 % 86800OVER HEAD CHARGES @ 15 % 130200

G.TOTAL 1085000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 8 1510 120805 11KV G.O SWITCH NO. 2 4611 92226 11KV DISC INSULATOR with fitting NO. 6 331 19867 11 KV PIN INSULATOR NO. 24 44 10568 11 KV PIN ONLY K.G 24 52 12489 V SHAPE X-ARE NO. 4 929 371610 11KV TOP HAMPER NO. 4 260 104011 ACSR CONDUCTOR 3SWG MTR. 1200 27 3240012 G.S.L 8SWG K.G 70 49 343013 STAY SET COMPLETE NO. 6 565 339014 STAY WIRE 7/8 SWG K.G 50 52 260015 4 CORE CABLE MTR. 15 84 126016 M.S ANGLE IRON K.G 70 37 259017 M.S CHANNEL K.G 80 36 288018 M.S.FLATE K.G 25 38 95019 M.S NUT & BOLT K.G 20 55 110020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 6 335 201023 SUNDRIES FOR COMPLITION OF WORK 1042

87000OVERHEAD CHARGES @ 15 % 13050

ERRECTION CHARGES @ 10 % 8700

G.TOTAL 108750

SDO,(op) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 20 1590 318002 11 KV XLPE CABLE 3*300 mm2 MTR. 100 716 716003 11 KV XLPE CABLE CABLE BOX O/DOOR SET 1 2000 20004 11 KV XLPE CABLE CABLE BOX I/DOOR SET 1 1800 18005 11KV G.O SWITCH NO. 2 4611 92226 11KV DISC INSULATOR with fitting NO. 33 331 109237 11 KV PIN INSULATOR NO. 60 44 26408 11 KV PIN ONLY K.G 60 52 31209 V SHAPE X-ARE NO. 16 929 1486410 11KV TOP HAMPER NO. 16 260 416011 ACSR CONDUCTOR 3 SWG MTR. 8500 28 23800012 G.S.L 8SWG K.G 300 49 1470013 STAY SET COMPLETE NO. 15 565 847514 STAY WIRE 7/8 SWG K.G 150 52 780016 M.S ANGLE IRON K.G 150 37 555017 M.S CHANNEL K.G 250 36 900018 M.S.FLATE K.G 150 38 570019 M.S NUT & BOLT K.G 100 55 550020 11KV L/ARRESTOR SET 3 3000 900021 EARTHING SET NO. 9 335 301522 SUNDRIES TO COMPLETE THE JOB 715

SUB-TOTAL 459584CONTIGENCY +TRANSPORTATION 5% 22979LABOUR CHARGES (detail overleaf) 17437

G.TOTAL 500000

SDO ,(op), SUB.DIVIN.UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 D/O H POLE WITH 2 STAY NO. 1 82.5 82.5

2 E/O H POLE WITH 2 STAY NO. 1 165 165

3 D/O OF RD FUSE SYSTEM NO. 1 40 40

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 D/O OF CABLE MTR. 15 26 26

6 E/O OF CABLE MTR. 15 52 52

7 D & SAGGING OF ACSR MTR. 150 100 /K.M 15

8 E/O 25 kva T/F NO. 1 480 480

9 E/O 25 kva T/F NO. 1 480 480

TOTAL 1420.5

ADD 250% PREMIUM 3393

G.TOTAL 4814

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 D/O H POLE WITH 2 STAY NO. 4 82.5 330

2 E/O H POLE WITH 2 STAY NO. 4 165 660

3 D/O OF PCC POLE 11 MTR. NO. 2 60 120

4 E/O OF PCC POLE 11 MTR. NO. 2 120 240

5 E/O Stay Set NO. 7 30 210

6 E & SAGGING OF ACSR 100 mm2 MTR. 400 300 /K.M 120

7 D/O OF ACSR 100 mm2 MTR. 200 150 /K.M 30

8 E & SAGGING OF ACSR 50 mm2 MTR. 800 220 /K.M 176

9 D/O OF ACSR 50 mm2 MTR. 600 110 /K.M 66

TOTAL 1952

ADD 250% PREMIUM 4880

G.TOTAL 6832

SAY Rs. 6832

SDO (OP) SUB.DIVIN.

UHBVN, NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 11 kv XLPE Cable Straight Joint 3*300 mm2 set 1 8500 85002 11 kv XLPE Outdoor Cable 3*300 mm2 set 1 6000 6000

TOTAL 14500

CONTIGENCY +TRANSPORTATION 3.5% 507 G.TOTAL 15007

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 11 kv AB Cable Straight Joint 3*35 mm2 set 2 7600 15200

TOTAL 15200

CONTIGENCY +TRANSPORTATION 3.5% 525 G.TOTAL 15725

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 DISTRIBUTION T/F 63 KVA NO. 92000 02 DISTRIBUTION T/F 25 KVA NO. 60000 03 PCC POLE 9Mtr.LONG NO. 1708 04 PLATFORM SET SET 2608 05 J BOLT SET SET 232 06 11KV G.O SWITCH NO. 4700 07 11KV DISC INSULATOR NO. 252 08 11 KV DISC FITTING NO. 659 11 KV PIN INSULATOR NO. 25 010 11 KV PIN ONLY K.G 49 011 LT INSULATOR NO. 939 012 MS D-STRAP NO. 265 013 ACSR CONDUCTOR 3 SWG MTR. 23 014 G.S.L 8SWG K.G 52 015 STAY SET COMPLETE NO. 535 016 STAY WIRE 7/8 SWG K.G 47 017 STAY X- PLATE NO. 344 018 4 CORE CABLE MTR. 55 019 M.S ANGLE IRON K.G 40 020 M.S CHANNEL K.G 39 021 M.S.FLATE K.G 42 022 M.S NUT & BOLT K.G 70 023 11KV L/ARRESTOR SET 525 024 EARTHING SET NO. 500 025 OPEN TYPE FUSE SYSTEM NO. 1000 026 3 PHASE,4WIRE,ENERGY METER NO. 5000 027 SUNDRIES FOR COMPLITION OF WORK 1000

TOTAL 1000CONTIGENCY +TRANSPORTATION 5% 50LABOUR CHARGES (detail overleaf) 3770

G.TOTAL 4820

SDO S/U SUB.DIVIN. UHBVNL,KARNAL

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 7 1750 122502 SUSPENSION CLAMP EYE BOLT NO. 5 400 20003 TENSION CLAMP WITH EYE BOLT NO. 2 230 4604 11KV G.O SWITCH NO. 2 4700 94005 XLPE CABLE BOX 300 MM2 OUTDOOR NO. 3 5000 150006 XLPE CABLE BOX 300 MM2 INDOOR NO. 3 5000 150007 11 XLPE CABLE, 3X 300 MM2 MTR. 600 794 4764008 11 KV XLPE CABLE, 3X 185 MM2 MTR. 100 576 576009 XLPE CABLE BOX 185 MM2 OUTDOOR NO. 1 4500 450010 XLPE CABLE BOX 185 MM2 INDOOR NO. 1 4500 450011 MS CHANNEL K.G 50 46 230012 MS ANGLE K.G 30 46 138013 MS FLAT K.G 25 46 115014 STAY SET COMPLETE NO. 4 565 226015 STAY WIRE 7/8 SWG K.G 40 57 228016 M.S NUT & BOLT K.G 40 53 212017 EARTHING SET NO. 4 233 93218 11 KV DISC INSULATORS FOR STAY NO. 4 160 64019 BARBED WIRE K.G 20 50 100020 11 KV LIGHTENING ARRESTOR NO. 6 420 2520

SUNDRIES FOR COMPLITION OF WORK 1308SUB TOTAL 615000

CONTINGENCY @ 1 % 6150TRANSPORTATION @ 2.5 % 15375LABOUR CHARGES( detail overleaf) 12607

G.TOTAL 649132

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O XLPE CABLE NO. 700 5 480

2 E/O H POLE WITH 2 STAY NO. 4 165 660

3 E/O OF PCC POLE 9MTR. NO. 1 90 90

4 E/O OF STAY SET NO. 4 30 120

5 D/O PCC POLES NO. 5 45 225

6 D/O ACSR MTR. 750 100/KM 75

7 E/O OF CABLE MTR. 15 52 52

8 E & SAGGING OF ACSR MTR. 8500 200 /K.M 1700

9 E/O L / ARRESTOR SET 2 100 200

TOTAL 3602

ADD 250% PREMIUM 9005

G.TOTAL 12607

SAY Rs. 12607

SDO ,(OP) SUB.DIVIN.UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9 Mtr.LONG NO. 3 1750 52502 MS D- STRAP NO. 12 60 7203 LT INSULATOR NO. 12 10 1204 ACSR 3 SWG NO. 600 28 168005 EGG INSULATOR NO. 3 10 3011 MS CHANNEL K.G 30 46 138012 MS ANGLE K.G 20 46 92013 MS FLAT K.G 15 46 69014 STAY SET COMPLETE NO. 2 565 113015 STAY WIRE 7/8 SWG K.G 16 56 89616 M.S NUT & BOLT K.G 20 58 1160

SUNDRIES FOR COMPLITION OF WORK 1308SUB TOTAL 30404

CONTINGENCY @ 1 % 305TRANSPORTATION @ 2.5 % 760LABOUR CHARGES( detail overleaf) 1575

G.TOTAL 33044

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O OF PCC POLE 9 MTR. NO. 3 90 270

2 E/O Stay Set NO. 2 30 60

3 E & SAGGING OF ACSR 3 SWG MTR. 600 200 /K.M 120

TOTAL 450

ADD 250% PREMIUM 1125

G.TOTAL 1575

SAY Rs. 1575

SDO (OP) SUB.DIVIN.

UHBVN, NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 33 kv XLPE Outdoor Cable Box 3*300 mm2 NO. 1 14200 142002 sundries to complete the job 300

TOTAL 14500

CONTIGENCY +TRANSPORTATION 3.5% 497

G.TOTAL 14997

SDO,(op),S/Divn.UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 3150 63002 PLATFORM SET SET 1 2314 23143 J BOLT SET SET 1 285 2854 11KV G.O SWITCH NO. 1 6500 65005 GO SWITCH PIPE NO. 1 1000 10006 11KV DISC INSULATOR with fitting NO. 0 400 07 11 KV PIN INSULATOR NO. 9 65 5858 11 KV PIN ONLY K.G 9 90 8109 V SHAPE X-ARM NO. 0 1100 010 11KV TOP HAMPER NO. 0 260 011 ACSR CONDUCTOR 3SWG MTR. 100 39 390012 G.S.L 8SWG K.G 15 65 97513 STAY SET COMPLETE NO. 0 1050 014 STAY WIRE 7/8 SWG K.G 0 68 015 4 CORE CABLE MTR. 15 120 180016 M.S ANGLE IRON K.G 60 60 360017 M.S CHANNEL K.G 80 60 480018 M.S.FLATE K.G 50 60 300019 M.S NUT & BOLT K.G 15 70 105020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 650 195022 OPEN TYPE FUSE SYSTEM NO. 1 1000 100023 3 Phase,4 Wire Elec.Meter NO. 1 4800 480024 METER COVER BOX WITH CLAMP NO. 1 650 65025 BARBED WIRE K.G 5 100 50026 DANGER PLATE NO. 2 110 22027 ALLUMINIUM THMBLE NO. 6 50 30028 BIMETELIC CLAMP NO. 7 100 70029 LABOUR CHARGES 1 9000 900030 TRANSPORTATION 1 4000 4000

S.TOTAL 63039

SDO (OP) SUB.DIVIN. UHBVNL,NIOLKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 5 3150 157502 PLATFORM SET SET 1 4800 48003 J BOLT SET SET 1 400 4004 11KV G.O SWITCH NO. 1 6500 65005 PIPE FOR GO SWITCH NO. 1 1000 10006 11KV DISC INSULATOR with fitting NO. 9 400 36007 11 KV PIN INSULATOR NO. 15 95 14258 11 KV PIN ONLY K.G 15 108 16209 V SHAPE X-ARM NO. 3 1100 330010 11KV TOP HAMPER NO. 3 260 78011 ACSR CONDUCTOR 3SWG MTR. 1100 39 4290012 G.S.L 8SWG K.G 60 72 432013 STAY SET COMPLETE NO. 3 1050 315014 STAY WIRE 7/8 SWG K.G 24 72 172815 4 CORE CABLE MTR. 15 120 180016 M.S ANGLE IRON K.G 70 72 504017 M.S CHANNEL K.G 90 72 648018 M.S.FLATE K.G 40 72 288019 M.S NUT & BOLT K.G 40 70 280020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 650 195022 OPEN TYPE FUSE SYSTEM NO. 1 1000 100023 3 Phase,4 Wire Elec.Meter NO. 1 4800 480024 METER COVER BOX WITH CLAMP NO. 1 650 65025 STAY X-PLATE NO. 3 180 54026 BARBED WIRE K.G 15 100 150027 DANGER PLATE NO. 5 110 55028 ALLUMINIUM THMBLE NO. 6 50 30029 BIMETELIC CLAMP NO. 7 100 70030 LABOUR CHARGES 1 15000 1500031 TRANSPORTATION 1 5000 5000

S.TOTAL 145263

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 3150 63002 PLATFORM SET SET 1 4800 48003 J BOLT SET SET 1 400 4004 11KV G.O SWITCH NO. 1 6500 65005 PIPE FOR GO SWITCH NO. 1 1000 10006 11KV DISC INSULATOR with fitting NO. 0 400 07 11 KV PIN INSULATOR NO. 9 95 8558 11 KV PIN ONLY K.G 9 108 9729 V SHAPE X-ARM NO. 0 1100 010 11KV TOP HAMPER NO. 0 260 011 ACSR CONDUCTOR 3SWG MTR. 100 39 390012 G.S.L 8SWG K.G 15 72 108013 STAY SET COMPLETE NO. 0 1050 014 STAY WIRE 7/8 SWG K.G 0 72 015 4 CORE CABLE MTR. 15 120 180016 M.S ANGLE IRON K.G 70 72 504017 M.S CHANNEL K.G 90 72 648018 M.S.FLATE K.G 40 72 288019 M.S NUT & BOLT K.G 15 70 105020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 650 195022 OPEN TYPE FUSE SYSTEM NO. 1 1000 100023 3 Phase,4 Wire Elec.Meter NO. 1 4800 480024 METER COVER BOX WITH CLAMP NO. 1 650 65025 STAY X-PLATE NO. 3 180 54026 BARBED WIRE K.G 5 100 50027 DANGER PLATE NO. 2 110 22028 ALLUMINIUM THMBLE NO. 6 50 30029 BIMETELIC CLAMP NO. 7 100 70030 LABOUR CHARGES 1 8000 800031 TRANSPORTATION 1 5000 5000

S.TOTAL 69717

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 11 1510 166102 11KV G.O SWITCH NO. 1 4700 47003 11KV DISC INSULATOR with fitting NO. 12 252 30244 11 KV DISC FITTING NO. 12 65 7805 11 KV PIN INSULATOR NO. 33 25 8256 11 KV PIN ONLY K.G 33 49 16177 V SHAPE X-ARE NO. 11 939 103298 11KV TOP HAMPER NO. 11 265 29159 ACSR CONDUCTOR 3 SWG MTR. 3000 27 8100010 G.S.L 8SWG K.G 100 52 520011 STAY SET COMPLETE NO. 8 535 428012 STAY WIRE 7/8 SWG K.G 65 47 305513 STAY X- PLATE NO. 8 344 275214 M.S ANGLE IRON K.G 70 40 280015 M.S CHANNEL K.G 100 39 390016 M.S.FLATE K.G 70 42 294017 M.S NUT & BOLT K.G 60 70 420018 EARTHING SET NO. 3 500 150019 SUNDRIES FOR COMPLITION OF WORK 1667

TOTAL 154094CONTIGENCY @ 1 % 1541TRANSPORTATION @ 2.5% 3852

LABOUR CHARGES (detail overleaf) 5513

S.TOTAL 165000G.TOTAL 165000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O OF PCC POLE 9MTR. NO. 11 90 990

2 E/O OF STAY SET NO. 8 30 240

3 D/O PCC POLES NO. 2 45 90

4 D/O ACSR MTR. 600 100/KM 75

5 E & SAGGING OF ACSR MTR. 3000 200 /K.M 180

TOTAL 1575

ADD 250% PREMIUM 3938

G.TOTAL 5513

SDO,(op),SUB.DIVIN. UHBVN,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9 Mtr.LONG NO. 4 1760 70402 EYE BOLT NO. 5 250 12503 SUSPENSION CLAMP NO. 3 400 12004 TENSION CLAMP NO. 2 230 4605 LT AB CABLE,3x120 MM2+95+16 mm2 NO. 180 210 378006 AB CABLE TERMINATION KIT NO. 2 4000 80007 G.S.L 8SWG K.G 40 52 20808 STAY SET COMPLETE NO. 4 700 28009 STAY WIRE 7/8 SWG K.G 32 58 185610 STAY X- PLATE NO. 4 370 148011 M.S ANGLE IRON K.G 20 40 80012 M.S CHANNEL K.G 40 39 156013 M.S.FLATE K.G 15 42 63014 M.S NUT & BOLT K.G 10 70 70015 EARTHING ROD NO. 6 550 330016 SUNDRIES FOR COMPLITION OF WORK 896

TOTAL 71852CONTIGENCY @ 1 % 719TRANSPORTATION @ 2.5% 1796

LABOUR CHARGES (detail overleaf) 6633

S.TOTAL 81000G.TOTAL 81000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O OF PCC POLE 9MTR. NO. 4 90 360

2 E/O OF STAY SET NO. 4 30 120

3 FILLING OF TERMINATION KIT NO. 2 250 500

4 D/O ACSR MTR. 150 100/KM 15

5 E & SAGGING OF AB CABLE MTR. 180 5 900

TOTAL 1895

ADD 250% PREMIUM 4738

G.TOTAL 6633

SDO,(op),SUB.DIVIN. UHBVN,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 41 1590 651902 DISTRIBUTION T/F 25 KVA NO. 1 56352 563523 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 20 331 66207 11 KV PIN INSULATOR NO. 52 44 22888 11 KV PIN ONLY K.G 52 52 27049 V SHAPE X-ARE NO. 24 929 2229610 11KV TOP HAMPER NO. 0 260 011 ACSR CONDUCTOR 3 SWG MTR. 5000 28 14000012 G.S.L 8SWG K.G 300 49 1470013 STAY SET COMPLETE NO. 12 565 678014 STAY WIRE 7/8 SWG K.G 96 52 499215 2 CORE CABLE, 10 MM2 MTR. 100 25 250016 M.S ANGLE IRON K.G 200 37 740017 M.S CHANNEL K.G 300 36 1080018 M.S.FLATE K.G 150 38 570019 M.S NUT & BOLT K.G 100 55 550020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 10 335 335022 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 LT INSULATOR NO. 15 15 22524 MS D-STRAP 15 75 1125

SUNDRIES FOR COMPLITION OF WORK 744370026

TOTALCONTIGENCY +TRANSPORTATION 3.5% 12951LABOUR CHARGES (detail overleaf) 19023

G.TOTAL 402000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 5 165 825

2 E/O OF PCC POLE 9MTR. NO. 31 90 2790

3 E/O OF STAY SET NO. 2 30 60

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF GO SWITCH NO. 1 100 100

6 E & SAGGING OF ACSR MTR. 5000 200 /K.M 1000

7 E/O 25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 5435

ADD 250% PREMIUM 13588

G.TOTAL 19023

SAY Rs. 19023

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

NO MATERIAL REQUIRED

Detail of Labour Charges

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 D/O H POLE WITH 2 STAY NO. 1 82.5 82.5

2 E/O H POLE WITH 2 STAY NO. 1 165 165

3 E/O 16 kva T/F NO. 1 480 480

4 D/O OF RD FUSE SYSTEM NO. 1 40 40

5 E/O OF RD FUSE SYSTEM NO. 1 80 80

6 D/O OF GO SWITCH NO. 1 50 100

7 E/O OF GO SWITCH NO. 1 100 100

8 D/O ACSR MTR. 150 100 /K.M 15

9 D/O 16 kva T/F NO. 1 240 480

10 E/O ACSR MTR. 50 200 /K.M 10

TOTAL 1553

ADD 250% PREMIUM 3883

S.Total 5436

Add Departmental Charges @ 10% 544

G.TOTAL 5980

SAY Rs. 5980

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

Detail of Labour Charges

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 190 1590 3021002 11 KV VCB NO. 1 265000 2650003 11 KV U/G CABLE,3x50 mm2 SET 100 270 270004 11 KV METERING EQUIPMENT NO. 1 100000 1000005 11KV G.O SWITCH NO. 3 4611 138336 11KV DISC INSULATOR with fitting NO. 43 331 142337 11 KV PIN INSULATOR NO. 18 44 7928 11 KV PIN ONLY K.G 18 52 9369 V SHAPE X-ARE NO. 929 010 11KV TOP HAMPER NO. 260 011 ACSR CONDUCTOR 3 SWG MTR. 500 28 1400012 G.S.L 8SWG K.G 200 49 980013 STAY SET COMPLETE NO. 43 565 2429514 STAY WIRE 7/8 SWG K.G 430 52 2236015 4 CORE CABLE MTR. 84 016 M.S ANGLE IRON K.G 300 37 1110017 M.S CHANNEL K.G 500 36 1800018 M.S.FLATE K.G 150 38 570019 M.S NUT & BOLT K.G 250 55 1375020 11KV L/ARRESTOR SET 10 3000 3000021 EARTHING SET NO. 60 335 2010022 OPEN TYPE FUSE SYSTEM NO. 550 023 3 PHASE,4WIRE,ENERGY METER NO. 1810 01 HT AB CABLE, 3C x 50+70 mm2 MTR. 5000 230 11500002 SUSPENSION CLAMP NO. 190 225 427503 TENSION CLAMP NO. 12 400 48004 NUT & BOLT KG 56 05 GSL 8 SWG KG 44 06 AB CABLE BOX NO. 1220 07 ST. THROUGH JOINT NO. 625 0

2090549

TOTALCONTIGENCY +TRANSPORTATION 3.5% 73169LABOUR CHARGES (detail overleaf) 3351

G.TOTAL 2167069

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLES , 9 MTR. LONG NO. 17 1760 299202 ACSR, 3 SWG MTR 200 28 56003 11 KV DISC INSULATOR NO. 3 331 9934 11 KV PIN INSULATOR NO. 12 47 5645 STAY SET COMPLETE NO. 10 700 70006 STAY WIRE 7/8 SWG KG 50 58 29007 MS FLATE KG 30 46 13808 EARTHING SET NO. 6 565 33909 MS NUT & BOLT KG 30 58 174010 11 KV POST INSULATOR NO. 2 331 662

SUNDRIES TO COMPLEE THE JOB 2648

TOTAL 56797

CONTIGENCY +TRANSPORTATION 3.5% 1988LABOUR CHARGES (detail given below) 26215 G.TOTAL 85000

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 8 165 1320

2 E/O OF PCC POLE 9MTR. NO. 5 90 450

3 E/O OF STAY SET NO. 10 30 300

4 E/O OF RD FUSE SYSTEM NO. 8 80 640

5 E/O OF GO SWITCH NO. 8 100 100

6 E & SAGGING OF ACSR MTR. 200 200 /K.M 40

7 E/O 16/20/25 kva T/F NO. 8 480 3840

8 E/O L / ARRESTOR SET 8 100 800

TOTAL 7490

ADD 250% PREMIUM 18725

G.TOTAL 26215

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 95 1590 1510502 11 KV VCB NO. 1 265000 2650003 11 KV U/G CABLE,3x50 mm2 SET 100 270 270004 11 KV METERING EQUIPMENT NO. 1 100000 1000005 11KV G.O SWITCH NO. 3 4611 138336 11KV DISC INSULATOR with fitting NO. 103 331 340937 11 KV PIN INSULATOR NO. 288 44 126728 11 KV PIN ONLY K.G 288 52 149769 V SHAPE X-ARE NO. 90 929 8361010 11KV TOP HAMPER NO. 90 260 2340011 ACSR CONDUCTOR 3 SWG MTR. 17000 28 47600012 G.S.L 8SWG K.G 500 49 2450013 STAY SET COMPLETE NO. 43 565 2429514 STAY WIRE 7/8 SWG K.G 430 52 2236015 M.S ANGLE IRON K.G 300 37 1110016 M.S CHANNEL K.G 500 36 1800017 M.S.FLATE K.G 150 38 570018 M.S NUT & BOLT K.G 250 55 1375019 11KV L/ARRESTOR SET 5 3000 1500020 EARTHING SET NO. 30 335 10050

SUNDRIES TO COMPLETE THE JOB 1519

TOTAL 1347908

CONTIGENCY +TRANSPORTATION 3.5% 47177LABOUR CHARGES (detail overleaf) 54915

G.TOTAL 1450000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 10 165 1650

2 E/O OF PCC POLE 9MTR. NO. 75 90 6750

3 E/O OF STAY SET NO. 23 30 690

4 E/O OF RD FUSE SYSTEM NO. 0 80 0

5 E/O OF GO SWITCH NO. 3 100 100

6 E & SAGGING OF ACSR MTR. 17000 200 /K.M 3400

7 E/O 16/20/25 kva T/F NO. 0 480 0

8 E/O OF VCB NO. 1 2000 2000

9 E /O U/G CABLE MTR. 100 5 500

10 E / O GSL MTR. 500 200 /K.M 100

11 E/O L / ARRESTOR SET 5 100 500

TOTAL 15690

ADD 250% PREMIUM 39225

G.TOTAL 54915

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLES , 9 MTR. LONG NO. 7 1760 123202 ACSR, 3 SWG MTR 100 28 28003 11 KV DISC INSULATOR NO. 3 331 9934 11 KV PIN INSULATOR NO. 10 47 4705 STAY SET COMPLETE NO. 3 700 21006 STAY WIRE 7/8 SWG KG 30 58 17407 MS FLATE KG 20 46 9208 EARTHING SET NO. 3 565 16959 MS NUT & BOLT KG 15 58 87010 11 KV POST INSULATOR NO. 1 331 331

SUNDRIES TO COMPLEE THE JOB 2641

TOTAL 26880

CONTIGENCY +TRANSPORTATION 3.5% 941LABOUR CHARGES (detail given below) 5198 G.TOTAL 33019

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 5 90 450

3 E/O OF STAY SET NO. 3 30 90

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF GO SWITCH NO. 1 100 100

6 E & SAGGING OF ACSR MTR. 100 200 /K.M 20

7 E/O 16/20/25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 1485

ADD 250% PREMIUM 3713

G.TOTAL 5198

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLES , 9 MTR. LONG NO. 4 1760 70402 ACSR, 3 SWG MTR 100 28 28003 11 KV DISC INSULATOR NO. 3 331 9934 11 KV PIN INSULATOR NO. 6 47 2825 STAY SET COMPLETE NO. 3 700 21006 STAY WIRE 7/8 SWG KG 30 58 17407 MS FLATE KG 20 46 9208 EARTHING SET NO. 3 565 16959 MS NUT & BOLT KG 15 58 87010 11 KV POST INSULATOR NO. 1 331 331

SUNDRIES TO COMPLEE THE JOB 3207

TOTAL 21978

CONTIGENCY +TRANSPORTATION 3.5% 769LABOUR CHARGES (detail given below) 4253 G.TOTAL 27000

SDO,(op) SUB.DIVIN. UHBVNL,Nilokheri

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 2 90 180

3 E/O OF STAY SET NO. 3 30 90

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF GO SWITCH NO. 1 100 100

6 E & SAGGING OF ACSR MTR. 100 200 /K.M 20

7 E/O 16/20/25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 1215

ADD 250% PREMIUM 3038

G.TOTAL 4253

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 20 1590 318002 DISTRIBUTION T/F 25 KVA NO. 2 56352 1127043 PLATFORM SET SET 2 2314 46284 J BOLT SET SET 2 285 5705 11KV G.O SWITCH NO. 2 4611 92226 11KV DISC INSULATOR with fitting NO. 20 331 66207 11 KV PIN INSULATOR NO. 32 44 14088 11 KV PIN ONLY K.G 32 52 16649 V SHAPE X-ARE NO. 12 929 1114810 11KV TOP HAMPER NO. 12 260 312011 ACSR CONDUCTOR 3 SWG MTR. 2100 28 5880012 G.S.L 8SWG K.G 125 49 612513 STAY SET COMPLETE NO. 8 565 452014 STAY WIRE 7/8 SWG K.G 80 52 416015 2 CORE CABLE, 10 MM2 MTR. 150 25 375016 M.S ANGLE IRON K.G 150 37 555017 M.S CHANNEL K.G 180 36 648018 M.S.FLATE K.G 100 38 380019 M.S NUT & BOLT K.G 50 55 275020 11KV L/ARRESTOR SET 2 3000 600021 EARTHING SET NO. 2 335 67022 OPEN TYPE FUSE SYSTEM NO. 2 550 110023 LT INSULATOR NO. 6 15 9024 MS D-STRAP 6 75 450

SUNDRIES FOR COMPLITION OF WORK 1195288324

TOTALCONTIGENCY +TRANSPORTATION 3.5% 10091LABOUR CHARGES (detail overleaf) 11585

G.TOTAL 310000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 11 1590 174902 DISTRIBUTION T/F 25 KVA NO. 1 56352 563523 PLATFORM SET SET 1 2314 23144 J BOLT SET SET 1 285 2855 11KV G.O SWITCH NO. 1 4611 46116 11KV DISC INSULATOR with fitting NO. 9 331 29797 11 KV PIN INSULATOR NO. 20 44 8808 11 KV PIN ONLY K.G 20 52 10409 V SHAPE X-ARE NO. 8 929 743210 11KV TOP HAMPER NO. 8 260 208011 ACSR CONDUCTOR 3 SWG MTR. 1350 28 3780012 G.S.L 8SWG K.G 100 49 490013 STAY SET COMPLETE NO. 5 565 282514 STAY WIRE 7/8 SWG K.G 50 52 260015 2 CORE CABLE, 10 MM2 MTR. 20 25 50016 M.S ANGLE IRON K.G 100 37 370017 M.S CHANNEL K.G 125 36 450018 M.S.FLATE K.G 50 38 190019 M.S NUT & BOLT K.G 40 55 220020 11KV L/ARRESTOR SET 1 3000 300021 EARTHING SET NO. 3 335 100522 OPEN TYPE FUSE SYSTEM NO. 1 550 55023 LT INSULATOR NO. 0 15 024 MS D-STRAP 0 75 0

SUNDRIES FOR COMPLITION OF WORK 1209162152

TOTALCONTIGENCY +TRANSPORTATION 3.5% 5675LABOUR CHARGES (detail overleaf) 8173

G.TOTAL 176000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 11 90 990

3 E/O OF STAY SET NO. 5 30 150

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF GO SWITCH NO. 1 100 100

6 E & SAGGING OF ACSR MTR. 1350 200 /K.M 270

7 E/O 16/20/25 kva T/F NO. 1 480 480

8 E/O L / ARRESTOR SET 1 100 100

TOTAL 2335

ADD 250% PREMIUM 5838

G.TOTAL 8173

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 2 165 330

2 E/O OF PCC POLE 9MTR. NO. 16 90 1440

3 E/O OF STAY SET NO. 6 30 180

4 E/O OF RD FUSE SYSTEM NO. 2 80 160

5 E/O OF GO SWITCH NO. 2 100 100

6 E & SAGGING OF ACSR MTR. 2100 200 /K.M 420

7 E/O 25 kva T/F NO. 2 480 480

8 E/O L / ARRESTOR SET 2 100 200

TOTAL 3310

ADD 250% PREMIUM 8275

G.TOTAL 11585

SAY Rs. 11585

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 11 2013 221432 DISTRIBUTION T/F 25 KVA NO. 1 47209 472093 PLATFORM SET SET 1 3060 30604 J BOLT SET SET 1 160 1605 11KV G.O SWITCH NO. 1 5200 52006 11KV DISC INSULATOR with fitting NO. 6 293 17587 11 KV PIN INSULATOR NO. 21 23 4838 11 KV PIN ONLY K.G 21 57 11979 V SHAPE X-ARE NO. 5 950 475010 11KV TOP HAMPER NO. 5 250 125011 ACSR CONDUCTOR 3 SWG MTR. 900 27 2430012 G.S.L 8SWG K.G 50 56 280013 STAY SET COMPLETE NO. 4 702 280814 STAY WIRE 7/8 SWG K.G 32 57 182415 GUY INSULATOR NO. 5 18 9016 LT 4C CABLE 25 MM2 MTR. 20 77 154017 M.S ANGLE IRON K.G 70 47 329018 M.S CHANNEL K.G 80 47 376019 M.S.FLATE K.G 50 47 235020 M.S NUT & BOLT K.G 25 58 145021 11KV L/ARRESTOR SET 1 2420 242022 EARTHING SET NO. 5 350 175023 OPEN TYPE FUSE SYSTEM NO. 1 750 75024 11 KV AB CABLE,3X35+70 MM2 MTR. 120 283 3396025 SUSPENSION CLAMP WITH EYE HOOK NO. 4 425 170026 DEAD END CLAMP WITH EYE HOOK NO. 2 244 48829 CABLE BOX NO. 2 5000 10000

182490

TOTALCONTIGENCY +TRANSPORTATION 3.5% 6387LABOUR CHARGES (detail overleaf) 9685

G.TOTAL 198562

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF PCC POLE 9MTR. NO. 9 90 810

3 E/O OF STAY SET NO. 5 30 150

4 E/O OF RD FUSE SYSTEM NO. 1 80 80

5 E/O OF GO SWITCH NO. 1 100 100

6 E & SAGGING OF ACSR MTR. 900 200 /K.M 180

7 E/O 25 kva T/F NO. 1 480 480

8 E/O AB CABLE,3X35 MM2 NO. 120 5 750

9 E/O 4/C CABLE UPTO 20 MTR NO. 1 52 52

TOTAL 2767

ADD 250% PREMIUM 6918

G.TOTAL 9685

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT

1 Insulted plier ( Taparia) No. 40 237 9480

2 Insulated Test Pen ( Taparia) No. 35 53 1855

3 Screw Driver (Taparia) No. 50 53 2650

4 Hand Gloves Pair 25 474 11850

5 Torch Chargable No. 20 579 11580

6 Bamboo Ladders No. 5 2000 10000

47415

CONTIGENCY +

TRANSPORTATION 3.5% 1660

G.TOTAL 49075

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT

1 Insulted plier ( Taparia) No. 15 250 3750

2 Insulated Test Pen ( Taparia) No. 15 60 900

3 Screw Driver (Taparia) No. 15 75 1125

4 Hand Gloves Pair 15 600 9000

5 Torch Chargable No. 15 700 10500

6 Rain Coat No. 15 1500 22500

47775

CONTIGENCY +

TRANSPORTATION 3.5% 1672

G.TOTAL 49447

SDO,CITY SUB.DIVIN. UHBVN,KARNAL

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 Battery Charger, 100 ah No. 1 40000 40000

Sundries to complete the job 2000TOTAL 42000

CONTIGENCY +TRANSPORTATION 3.5% 1470 G.TOTAL 43470

SDO,(op) SUB.DIVIN. UHBVNL,Assandh

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 Battery Cell 2 volt,100 ah set 12 4000 48000

Sundries to complete the job 300TOTAL 48300

CONTIGENCY +TRANSPORTATION 3.5% 1691 G.TOTAL 49991

SDO,(op) SUB.DIVIN. UHBVNL,Assandh

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 2013 40262 LT INSULATOR NO. 6 18 1083 MS D STRAP SET 6 80 4804 ACSR CONDUCTOR 3 SWG MTR. 150 29 43505 G.S.L 8SWG K.G 50 56 28006 STAY SET COMPLETE NO. 2 702 14047 STAY WIRE 7/8 SWG K.G 20 57 11408 GUY INSULATOR NO. 2 18 369 LT 4C CABLE 16 MM2 MTR. 20 58 116010 M.S.FLATE K.G 10 47 47011 M.S NUT & BOLT K.G 5 58 290

16264

TOTALCONTIGENCY +TRANSPORTATION 3.5% 569LABOUR CHARGES (detail overleaf) 1127

G.TOTAL 17960

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 2013 40262 DISTRIBUTION T/F 25 KVA NO. 1 47862 478623 PLATFORM SET SET 1 3060 30604 J BOLT SET SET 1 160 1605 11KV G.O SWITCH NO. 1 5200 52006 11KV DISC INSULATOR with fitting NO. 3 293 8797 11 KV PIN INSULATOR NO. 6 23 1388 11 KV PIN ONLY K.G 6 57 3429 ACSR CONDUCTOR 3 SWG MTR. 50 27 135010 G.S.L 8SWG K.G 10 56 56011 STAY SET COMPLETE NO. 3 702 210612 STAY WIRE 7/8 SWG K.G 24 57 136813 GUY INSULATOR NO. 3 18 5414 M.S ANGLE IRON K.G 60 47 282015 M.S CHANNEL K.G 100 47 470016 M.S.FLATE K.G 40 47 188017 M.S NUT & BOLT K.G 20 58 116018 11KV L/ARRESTOR SET 1 2420 242019 EARTHING SET NO. 3 350 105020 OPEN TYPE FUSE SYSTEM NO. 1 750 750

SUNDRIES TO COMPLETE THE JOB 732S.TOTAL 82617CONTINGENCY+TPT. @ 3.5% 2892LABOUR CHARGES (detail overleaf) 4491

G.TOTAL 90000

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 E/O H POLE WITH 2 STAY NO. 1 165 165

2 E/O OF STAY SET NO. 1 30 30

3 E/O OF RD FUSE SYSTEM NO. 1 80 80

4 E/O OF GO SWITCH NO. 1 100 100

5 D/O OF GO SWITCH NO. 1 50 100

6 E & SAGGING OF ACSR MTR. 50 200 /K.M 10

7 E/O 25 kva T/F NO. 1 480 480

8 D/O 10/16/20 kva T/F NO. 1 240 240

9 E/O 4/C CABLE UPTO 20 MTR NO. 1 52 52

10 D/O 4/C CABLE UPTO 20 MTR NO. 1 26 26

S.TOTAL 1283

ADD 250% PREMIUM 3208

G.TOTAL 4491

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL QTY. RATE AMOUNT

1

6915 193620

SUNDRIES TO COMPLETE THE JOB 1380

G.TOTAL 195000

AEE,S/U,S/Divn. UHBVN,Karnal

Chemical Gel Base Earthing size 50x300 mm2 with chemical 35 kg Bag Connection from earth pit to Transformer(Strip size 25x3 mm thimble,Nut&Bolt etc.) GI Including with freight & Labour charges

28 No. (7 No.

T/Fsx 4 No. of earthing)

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT

1 Insulted plier ( Taparia) No. 79 250 19750

2 Insulated Test Pen ( Taparia) No. 79 60 4740

3 Screw Driver (Taparia) No. 79 75 5925

4 Hand Gloves Pair 79 600 47400

5 Torch Chargable No. 79 750 59250

6 Ring Sppaner,7/16mmx9/16mm No. 79 178 14062

7 D.E. Sppanner,(9 Nos.) set 79 340 26860

S.TOTAL 177987

CONT.+TRANSPORTATION 3.5% 5502

G.TOTAL 183489

SDO,CITY SUB.DIVIN. UHBVN,KARNAL

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF T & P REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT

1 Insulted plier ( Taparia) No. 80 225 18000

2 Insulated Test Pen ( Taparia) No. 80 50 4000

3 Screw Driver (Taparia) No. 80 60 4800

4 Hand Gloves Pair 50 580 29000

5 Torch Chargable No. 50 575 28750

6 Rope Pully ( Single Way) No. 4 975 3900

7 Rope Pully ( Double Way) set 4 1800 7200

S.TOTAL 95650

CONT.+TRANSPORTATION 3.5% 3348

G.TOTAL 98998

SDO,(OP) SUB.DIVIN.UHBVN,NISSING

DETAIL OF T & P REQUIRED

.

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE AMOUNT1 PCC POLE 9Mtr.LONG NO. 2 2170 43402 11KV DISC INSULATOR with fitting NO. 12 331 39723 ACSR CONDUCTOR 3 SWG MTR. 100 27 27004 EGG INULATOR NO. 3 18 545 STAY SET COMPLETE NO. 3 702 21066 STAY WIRE 7/8 SWG K.G 24 52 1248

14420

TOTALCONTIGENCY +TRANSPORTATION 3.5% 505LABOUR CHARGES (detail overleaf) 2950

G.TOTAL 17875

ADD 10% Dpartmental charges 1787

19662

SDO (OP) SUB.DIVIN. UHBVNL,NILOKHERI

DETAIL OF MATERIAL REQUIRED

.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 D/O OF PCC POLE 9MTR. NO. 1 45 45

2 E/O OF PCC POLE 9MTR. NO. 3 90 270

3 E/O OF STAY SET NO. 4 30 120

4 D/O ACSR MTR. 300 110 /K.M 33

5 E & SAGGING OF ACSR MTR. 400 220 /K.M 88

TOTAL 556

ADD 250% PREMIUM 2394

G.TOTAL 2950

SDO (OP) SUB.DIVIN. UHBVN ,NILOKHERI

DETAIL OF LABOUR CHARGES

DETAIL OF MATERIAL REQUIRED

S.NO. DESCRIPTION OF MATERIAL UNIT QTY. RATE1 PCC POLE 11 Mtr.LONG NO. 6 49002 11KV DISC INSULATOR with fitting NO. 29 13383 11 KV PIN INSULATOR with pin NO. 20 6304 11KV TOP HAMPER NO. 2 1535 ACSR CONDUCTOR 100 MM2 MTR. 850 536 G.S.L 8SWG K.G 70 557 STAY SET COMPLETE NO. 10 8798 STAY WIRE 7/8 SWG K.G 100 629 M.S ANGLE IRON K.G 130 5210 M.S CHANNEL K.G 160 5111 M.S.FLATE K.G 100 5112 M.S NUT & BOLT K.G 60 5513 11KV L/ARRESTOR SET 0 242014 EARTHING SET NO. 4 33515 MS X PLATE NO. 6 35016 SUNDRIES FOR COMPLITION OF WORK

ERRECTION CHARGES @ 15 % ON ITEM NO 1ERRECTION CHARGES @ 5 % ON ITEM NO 5ERRECTION CHARGES @ 10 % ON REST ITEMSOVERHEAD CHARGES @ 15%TRANSPORTATION & CONTINGENCY CHARGES @ 3.5%

S.TOTALADD 10% DEPARTMENTAL CHARGESDISMENTALMENT CHARGES AS (DETAILED OVERLEAF)

G.TOTAL

SDO (OP) SUB.DIVIN. UHBVNL,TARAORI

DETAIL OF MATERIAL REQUIRED

AMOUNT294003880212600306

4505038508790620067608160510033000

134021008242

180000441022539730270006300

229693229704272

256935

SDO (OP) SUB.DIVIN.

DETAIL OF LABOUR CHARGES

SR.NO. DESCRIPTION UNIT QTY. RATE AMOUNT

1 D/O OF PCC POLE 11 MTR. NO. 3 4900 14700

2 ACSR MTR. 780 53 41340

TOTAL

SDO (OP) SUB.DIVIN. UHBVN ,TARAORI

DETAIL OF LABOUR CHARGES

LABOUR CHARGES

2205

2067

4272