Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen Pelayanan K ebutuhan air terlayani I 150 pegaw ai 10 150 1500 80 1200 II 250 pegaw ai 10 250 2500 80 2000 III 300 pegaw ai 10 300 3000 80 2400 I 1200 m ^2 1.2 1200 1440 60 864 II 1400 m ^2 1.2 1400 1680 60 1008 I 350 murid 10 350 3500 55 1925 II 500 murid 10 500 5000 55 2750 III 600 murid 10 600 6000 55 3300 Rum ah sakit I 500 bed 200 L/bed/hr 500 100000 100 100000 I 250 bed 150 L/bed/hr 250 37500 100 37500 II 200 bed 150 L/bed/hr 200 30000 100 30000 I 600 m ^2 20 600 12000 90 10800 II 1 m ^2 20 1 20 90 18 Terminal Bis I 300 bisperhari 150 L/bed/hr 300 45000 50 22500 T otal 216265 Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen Pelayanan K ebutuhan air terlayani I 150 pegaw ai 10 180 1800 85 1530 II 250 pegaw ai 10 280 2800 85 2380 III 300 pegaw ai 10 330 3300 85 2805 I 1200 m ^2 1.2 1250 1500 65 975 II 1400 m ^2 1.2 1450 1740 65 1131 I 350 murid 10 400 4000 60 2400 II 500 murid 10 550 5500 60 3300 III 600 murid 10 650 6500 60 3900 Rum ah sakit I 500 bed 200 L/bed/hr 550 110000 100 110000 I 250 bed 150 L/bed/hr 280 42000 100 42000 II 200 bed 150 L/bed/hr 230 34500 100 34500 I 600 m ^2 20 750 15000 95 14250 II 1 m ^2 20 151 3020 95 2869 Terminal Bis I 300 bisperhari 150 L/bed/hr 350 52500 55 28875 T otal 250915 Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen Pelayanan K ebutuhan air terlayani I 150 pegaw ai 10 210 2100 90 1890 II 250 pegaw ai 10 310 3100 90 2790 III 300 pegaw ai 10 360 3600 90 3240 I 1200 m ^2 1.2 1300 1560 70 1092 II 1400 m ^2 1.2 1500 1800 70 1260 I 350 murid 10 450 4500 65 2925 II 500 murid 10 550 5500 65 3575 III 600 murid 10 700 7000 65 4550 Rum ah sakit I 500 bed 200 L/bed/hr 600 120000 100 120000 I 250 bed 150 L/bed/hr 310 46500 100 46500 II 200 bed 150 L/bed/hr 260 39000 100 39000 I 600 m ^2 20 900 18000 100 18000 II 1 m ^2 20 301 6020 100 6020 Terminal Bis I 300 bisperhari 150 L/bed/hr 400 60000 60 36000 T otal 286842 Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen Pelayanan K ebutuhan air terlayani I 150 pegaw ai 10 240 2400 95 2280 II 250 pegaw ai 10 340 3400 95 3230 III 300 pegaw ai 10 390 3900 95 3705 I 1200 m ^2 1.2 1350 1620 75 1215 II 1400 m ^2 1.2 1550 1860 75 1395 I 350 murid 10 500 5000 70 3500 II 500 murid 10 600 6000 70 4200 III 600 murid 10 750 7500 70 5250 Rum ah sakit I 500 bed 200 L/bed/hr 650 130000 100 130000 I 250 bed 150 L/bed/hr 340 51000 100 51000 II 200 bed 150 L/bed/hr 300 45000 100 45000 Hotel M asjid/Sarana Ibadah Sekolah Hotel M asjid/Sarana Ibadah Tahun 2019 StandarK ebutuhan (L/org/hr StandarK ebutuhan (L/org/hr Perkantoran Pertokoan/pasar Tahun 2014 Perkantoran Pertokoan/pasar Sekolah Hotel M asjid/Sarana Ibadah StandarK ebutuhan (L/org/hr Perkantoran Pertokoan/pasar Sekolah Hotel Tahun 2024 StandarK ebutuhan (L/org/hr Perkantoran Pertokoan/pasar Sekolah

description

FOTO FOTO LABLING

Transcript of Print Tugas 2a

Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen

PelayananKebutuhan air

terlayani

I 150 pegawai 10 150 1500 80 1200

II 250 pegawai 10 250 2500 80 2000

III 300 pegawai 10 300 3000 80 2400

I 1200 m^2 1.2 1200 1440 60 864

II 1400 m^2 1.2 1400 1680 60 1008

I 350 murid 10 350 3500 55 1925

II 500 murid 10 500 5000 55 2750

III 600 murid 10 600 6000 55 3300

Rumah sakit I 500 bed 200 L/bed/hr 500 100000 100 100000

I 250 bed 150 L/bed/hr 250 37500 100 37500

II 200 bed 150 L/bed/hr 200 30000 100 30000

I 600 m^2 20 600 12000 90 10800

II 1 m^2 20 1 20 90 18

Terminal Bis I 300 bis per hari 150 L/bed/hr 300 45000 50 22500Total 216265

Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen

PelayananKebutuhan air

terlayaniI 150 pegawai 10 180 1800 85 1530

II 250 pegawai 10 280 2800 85 2380

III 300 pegawai 10 330 3300 85 2805

I 1200 m^2 1.2 1250 1500 65 975

II 1400 m^2 1.2 1450 1740 65 1131

I 350 murid 10 400 4000 60 2400

II 500 murid 10 550 5500 60 3300

III 600 murid 10 650 6500 60 3900

Rumah sakit I 500 bed 200 L/bed/hr 550 110000 100 110000

I 250 bed 150 L/bed/hr 280 42000 100 42000

II 200 bed 150 L/bed/hr 230 34500 100 34500

I 600 m^2 20 750 15000 95 14250

II 1 m^2 20 151 3020 95 2869

Terminal Bis I 300 bis per hari 150 L/bed/hr 350 52500 55 28875Total 250915

Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen

PelayananKebutuhan air

terlayaniI 150 pegawai 10 210 2100 90 1890

II 250 pegawai 10 310 3100 90 2790

III 300 pegawai 10 360 3600 90 3240

I 1200 m^2 1.2 1300 1560 70 1092

II 1400 m^2 1.2 1500 1800 70 1260

I 350 murid 10 450 4500 65 2925

II 500 murid 10 550 5500 65 3575

III 600 murid 10 700 7000 65 4550

Rumah sakit I 500 bed 200 L/bed/hr 600 120000 100 120000

I 250 bed 150 L/bed/hr 310 46500 100 46500

II 200 bed 150 L/bed/hr 260 39000 100 39000

I 600 m^2 20 900 18000 100 18000

II 1 m^2 20 301 6020 100 6020

Terminal Bis I 300 bis per hari 150 L/bed/hr 400 60000 60 36000Total 286842

Penggunaan Tanah Lokasi**) Unit Satuan kebutuhan air Persen

PelayananKebutuhan air

terlayaniI 150 pegawai 10 240 2400 95 2280

II 250 pegawai 10 340 3400 95 3230

III 300 pegawai 10 390 3900 95 3705

I 1200 m^2 1.2 1350 1620 75 1215

II 1400 m^2 1.2 1550 1860 75 1395

I 350 murid 10 500 5000 70 3500

II 500 murid 10 600 6000 70 4200

III 600 murid 10 750 7500 70 5250

Rumah sakit I 500 bed 200 L/bed/hr 650 130000 100 130000

I 250 bed 150 L/bed/hr 340 51000 100 51000

II 200 bed 150 L/bed/hr 300 45000 100 45000

Total 324670

Total 362000

Hotel

Masjid/Sarana Ibadah

Sekolah

Hotel

Masjid/Sarana Ibadah

Tahun 2019

Standar Kebutuhan (L/org/hr

Standar Kebutuhan (L/org/hr

Perkantoran

Pertokoan/pasar

Tahun 2014

Perkantoran

Pertokoan/pasar

Sekolah

Hotel

Masjid/Sarana Ibadah

Standar Kebutuhan (L/org/hr

Perkantoran

Pertokoan/pasar

Sekolah

Hotel

Tahun 2024

Standar Kebutuhan (L/org/hr

Perkantoran

Pertokoan/pasar

Sekolah

Sarana Hidran 20 L/org/hari

TahunJumlah

PendudukStandar Hidran

Kebutuhan HidranKebutuhan Domestik

Kebutuan Non

Domestik

Total Kebutuhan

Total Debit Seluruhnya

(L/hari)Debit Kebutuhan Lain-Lain (L/hari)

2019 77707.63526 1554152.705 8013599.89 250915 9818667.59 174.8338246 61.191838622024 83779.26138 1675585.228 8922779.22 286842 10885206.4 193.8249011 67.838715392029 89835.90691 1796718.138 9662944.44 324670 11784332.6 209.8349819 73.442243662034 95877.6456 1917552.912 10426422 362000 12705974.9 226.2459913 79.18609697

Kebutuhan

20

Tahun 2019 Kebutuhan Debit Kebutuhan

Sarana Umum 10 % 17.48338246

IPAM 5 % 8.741691232

Water Loss 20 % 34.96676493

Tahun 2024 Kebutuhan

Sarana Umum 10 % Debit Kebutuhan

IPAM 5 % 19.38249011

Water Loss 20 % 9.691245056

38.76498022

Tahun 2029 Kebutuhan

Sarana Umum 10 % Debit Kebutuhan

IPAM 5 % 20.98349819

Water Loss 20 % 10.49174909

41.96699638

Tahun 2034 Kebutuhan

Sarana Umum 10 % Debit Kebutuhan

IPAM 5 % 22.62459913

Water Loss 20 % 11.31229957

45.24919827

Tahun Total Debit Keseluruhan

2019 174.8338246

2024 193.8249011

2029 209.8349819

2034 226.2459913

Faktor Tahun 2019 2024 2029 2034Faktor Hari Maksimum 1.2 209.8005896 232.5898813 251.802 271.4952

Faktor Jam Puncak 1.8 314.7008843 348.884822 377.703 407.2428

20182020202220242026202820302032203420360

50100150200250300350400450

f(x) = 6.12887691121442 x − 12058.0361960414R² = 0.998459412027724

f(x) = 4.08591794080964 x − 8038.69079736099R² = 0.998459412027722

Total Debit Keseluruhan

Faktor Harian PuncakLinear (Faktor Harian Puncak)Faktor Jam PuncakLinear (Faktor Jam Puncak)

Tahun

Tota

l Deb

it Ke

selu

ruha

n