    RENCANA ANGGARAN BI

    ( RAB )

    PEKERJAAN : PEMBANGUNAN CHEEF ENGINEER ACCOMMODATION PLAN

    LOKASI : SARULLA, TAPANULI UTARA

    No URAIAN PEKERJAAN VOLUME SAT

    1 2 3 4

    A. PEKERJAAN PERSIAPAN

    1 Pengukuran / Pematokan 54.20 m'

    2 Pembersihan Lapangan 442.00 m²

    3 Keamanan Dan P3K 1.00 ls

    4 obilisasi 2.00 ls

    B. PEKERJAAN PEMBANGUNAN CHEEF ENGINEER ACCOMMODATION PLAN

    I PEKERJAAN TANAH1 enggali tanah biasa 11.34 m!

    2 engurug kembali galian pon"asi 2.#4 m!

    3 $rugan pasir timbun 13.2%0 m!

    II. PEKERJAAN BETON

    1 Pon"asi tapak beton bertulang

    Lean &onreate thk 30mm K(1)5 0.54 m!

     *ekisting untuk pon"asi 1.)3 m²

     Pembesian besi ulir + 1% mm 3)4.,,0 kg

     Pembesian besi ulir + 10 mm 3,.%00 kg

     *eton mutu K225 2.5% m!

    2 -loo uk. 15 20 m beton bertulang

    *ekisting untuk sloo 54.200 m²

     Pembesian besi ulir + 1% mm %#4.325 kg

     Pembesian besi ulir + 10 mm 1)#.210 kg

     *eton mutu K225 %.))5 m!

    3 Kolom uk. 25 25 m beton bertulang

    *ekisting untuk kolom #.3)0 m²

     Pembesian besi ulir + 1% mm 1,2.040 kg

     Pembesian besi ulir + 10 mm 25.523 kg

     *eton mutu K225 1,.350 m!

    4 Lantai beton 120 mm iremesh (%

    Lapis plastik 442.000 m²

     *ekisting untuk lantai 1%.%0# m²

     Pembesian iremesh (% 1354.#43 kg

     *eton mutu K225 %%.52# m!

    III. PEKERJAAN BESI

    1 angka Kolom . 250125%, 1452.%00 Kg

    2 angka ku"a(ku"a . 250125%, 300).#50 Kg

    3 6elagar . 250125%, 23)).,%0 Kg

    4 6or"ing &7P 150502032 3)51.%25 Kg5 8katan 9ngin(9ngin +12mm 10%5.312 Kg

    % *aut +1%mm 2)0.000 *h

    ) -:uare Pipe 1005024 5,#.203 Kg

    # $7P #045%% 5,#.203 Kg

  • 8/16/2019 Penawaran Bang Bobi

    2/31

    RENCANA ANGGARAN BI

    ( RAB )

    PEKERJAAN : PEMBANGUNAN CHEEF ENGINEER ACCOMMODATION PLAN

    LOKASI : SARULLA, TAPANULI UTARA

    No URAIAN PEKERJAAN VOLUME SAT

    1 2 3 4

    IV. PEKERJAAN ATAP DAN PLAFOND

    1 9tap mega"ag ;inalum 0.35 mm

  • 8/16/2019 Penawaran Bang Bobi

    3/31

    RENCANA ANGGARAN BI

    ( RAB )

    PEKERJAAN : PEMBANGUNAN CHEEF ENGINEER ACCOMMODATION PLAN

    LOKASI : SARULLA, TAPANULI UTARA

    No URAIAN PEKERJAAN VOLUME SAT

    1 2 3 4

    VI. PEKERJAAN KAMAR MANDI & SANITASI

    1 Pasang &lose" "u"uk 1%.000 bh

    2 Pasang oor "rain 1%.000 bh

    3 Pasang paper hol"er 1%.000 bh

    2 *ak ?ber 1 m3 1%.000 m'

    3 Kran 9ir + 1/2@ 1%.000 ls

    4 Pasang pipa PE& + 1/2@ instalasi air bersih #4.200 m'

    5 itting ( ?tting instalasi air bersih e. uika 1.000 ls

    % Pipa PE& aCin 9 3@ #4.200 m'

    ) itting ( ?tting instalasi air bekas uika 1.000 ls# Keramik 20 20 m lantai kamar man"i )).2#0 m²

    , -eptitank ap. 3 m3 1.000 unit

    VII PEKERJAAN ELEKTRIKAL

    1 8nstalasi Penerangan 3%.000 Fitik

    2 8nstalasi -top Kontak 3%.000 Fitik

    3 -top Kontak G Panasoni 20.000 bh

    4 -aklar Funggal G Panasoni 20.000 bh

    5 -aklar 6an"a G Panasoni 20.000 bh

    % Lampu DL e. Hannok 13att LGD -arang 20.000 bh

    ) Lampu DL e. Hannok # att LGD -arang 1%.000 bh

    VIII PEKERJAAN PENGECATAN

    1 Pengeatan *i"ang Ka>u *aru "engan &at min>ak %3.#40 m²

    2 Pengeatan Plaon *aru 4%2.000 m²

    3 Pengeatan Fembok *aru 11%,.5%0 m²

    A. PEKERJAAN PERSIAPAN

    B. PEKERJAAN PEMBANGUNAN CHEEF ENGINEER ACCOMMODATION PLAN

  • 8/16/2019 Penawaran Bang Bobi

    4/31

    RENCANA ANGGARAN BI

    ( RAB )

    PEKERJAAN : PEMBANGUNAN CHEEF ENGINEER ACCOMMODATION PLAN

    LOKASI : SARULLA, TAPANULI UTARA

    No URAIAN PEKERJAAN VOLUME SAT

    1 2 3 4

  • 8/16/2019 Penawaran Bang Bobi

    5/31

      YA

     

    ANALISA

    HARGA SATUAN JUMLAH HARGA

    (Rp) (Rp)

    5 % )

    P9 %.2 5,)20.00 323%#24.00

    P9 %.% #,10.00 3,3#220.00

    lumpsum 15000000.00 15000000.00

    lumpsum 10000000.00 20000000.00

    S! To"#$ A %,',*%%.**

    PF %.1 42,20.00 4#%)12.#0

    1/4. PF %.1 10)30.00 3041,.55

    PF %.10 51100.00 %))5#%.00

    S! To"#$ I ','+%,'.-

    P* %.4 5,5050.00 32132).00

    P* %.1% 151520.00 2%1#2%.5%

    P* %.12 1%2)0.00 %1010#4.44

    P* %.12 1%2)0.00 %442,2.00

    P* %.% %4##40.00 1%5#435.04

    P* %.1% 151520.00 #2123#4.00

    P* %.12 1%2)0.00 11133,%5.54

    P* %.12 1%2)0.00 2#,,4)0.1,

    P* %.% %4##40.00 43,5#,1.00

    P* %.1) 254,#0.00 21341#2.%0

    P* %.12 1%2)0.00 31244,4.)%

    P* %.12 1%2)0.00 4152%0.#4

    P* %.% %4##40.00 12555054.00

    Dihitung 10000.00 4420000.00

    P* %.1% 151520.00 251%444.1%

    P* %.14 123#0.00 1%))2,5%.)5

    P* %.% %4##40.00 431%%02).52

    S! To"#$ II '*,--,*+.-+

    Dihitung 1)1#5.00 24,%2,31.00

    Dihitung 1)1#5.00 51%#,,0,.12

    Dihitung 1)1#5.00 40#%5242.%0

    Dihitung 1451#.00 544%%0##.#5Dihitung 14322.00 1525)3,#.4%

    Dihitung 3#30.00 1034100.00

    Dihitung 11445.00 %#4%431.05

    Dihitung 1451#.00 #%#4)0#.25

  • 8/16/2019 Penawaran Bang Bobi

    6/31

      YA

     

    ANALISA

    HARGA SATUAN JUMLAH HARGA

    (Rp) (Rp)

    5 % )

    S! To"#$ III *-,*,*+.--

    PP9 %.5 #)230.00 %12244)%.00

    P*9 %.1# 124210.00 5)3#502.00

    PLL %.49 2,250.00 13513500.00

    PLL %.%& 14240.00 33)2032.00

    S! To"#$ IV -,%,'*.**

    PK %.1%.9 105,%0.00 %2%5202#.#0

    PK %.1%.* 1004)0.00 5#0,,),1.%0Dihitung 1500000.00 30000000.00

    Dihitung #00000.00 12#00000.00

    Dihitung )50000.00 15000000.00

    Dihitung 350000.00 2#00000.00

    S! To"#$ V '',-',*.%*

  • 8/16/2019 Penawaran Bang Bobi

    7/31

  • 8/16/2019 Penawaran Bang Bobi

    8/31

      YA

     

    ANALISA

    HARGA SATUAN JUMLAH HARGA

    (Rp) (Rp)

    5 % )

  • 8/16/2019 Penawaran Bang Bobi

    9/31

  • 8/16/2019 Penawaran Bang Bobi

    10/31

    PT .'*

    K4!"8#5 S#"#5

    B#8#5 Pasir urug

    T45#1# 942#PekerIa JH

    an"or JH

    PT .''

    K4!"8#5 S#"#5

    B#8#5  Fanah Fimbun

    T45#1# 942#PekerIa JH

    an"or JH

    PP .%

    K4!"8#5 S#"#5

    B#8#5

    *atu Peah 10 ( 15 m

    -emen Portlan" kg

    Pasir Pasang / *eton

    *atu Peah 5 ( ) m

    *esi *eton Polos kg

    Kaat *eton kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    M45121 ' /- p#372 21

    m3

    M45121 ' /- "#5#8 21

    m3

    M4/#3#51 ' /- po56#37 379$op,

  • 8/16/2019 Penawaran Bang Bobi

    11/31

     PB .%

    K4!"8#5 S#"#5

    B#8#5

    -emen Portlan" kg

    Pasir Pasang / *eton kg

    Kerikil *eton kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JHan"or JH

    PB .

    K4!"8#5 S#"#5

    B#8#5

    -emen Portlan" kg

    Pasir Pasang / *eton kg

    Kerikil *eton kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PB .' P4/!437#5 '* 91 6451#5 !437 $72

    K4!"8#5 S#"#5

    B#8#5

    *esi beton

  • 8/16/2019 Penawaran Bang Bobi

    12/31

     B#8#5

    Ka>u Papan / *roti ak bekisting Liter

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PB .'

    K4!"8#5 S#"#5

    B#8#5

    Ka>u Papan / *roti ak bekisting Liter

    *alok ka>u kelas 888

     Fripleks , mm LbrKa>u Dolken/*ulat + 3@(4@ btg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    m3

    M4/#3#51 ' / !4973"751 5"9 9o$o/

    m3

    m3

  • 8/16/2019 Penawaran Bang Bobi

    13/31

     PK .'.A

    K4!"8#5 S#"#5

    B#8#5

    *esi Holo btg

    Paku 5 m "an 10 m kg

    6& Lembar

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PK .'.B

    K4!"8#5 S#"#5

    B#8#5

    *esi Holo btg

    Paku 5 m "an 10 m kg

    6>psum t A , mm Lembar

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PPL .%

    K4!"8#5 S#"#5

    B#8#5

    Keramik 2020 m *uah-emen Portlan" kg

    Pasir Pasang / *eton

     -emen arna kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PBA .' M4/#3#51 ' /> "#$#51 6#"#2? 2#7 3451 !$3

    K4!"8#5 S#"#5

    B#8#5

    -eng plat bIls 3' %' lbr

    Paku biasa kg

    Papan ka>u kelas 888

    linkote kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PPA . '/@ P#3#51 A"#p G45"451 M4"#$

    M4/#3#51 ' / 6756751 p4/73#8 GRC ": // 2#5

    M4/#3#51 ' / 6756751 p4/73#8 Gp3/ " : + /

    M4/#3#51 ' / $#5"#7 942#/79 92#5 (* *) <

    m3

    m3

  • 8/16/2019 Penawaran Bang Bobi

    14/31

     K4!"8#5 S#"#5

    B#8#56enteng etal 03 2

    Paku sekrup Kg

    T45#1#

     PekerIa Jh

     Fukang Jh

    Kepala tukang Jh

    an"or Jh

    PC .- ' /@ M4514

  • 8/16/2019 Penawaran Bang Bobi

    15/31

    PC .% ' /@ P4514psum Lembar

    Paku skrup kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    PLL .C M4/#3#51 ' /> $73" p$#=o5 1p3/ -

    K4!"8#5 S#"#5

    B#8#5

    List g>psum pro?l 3@ m

    tepung g>psum/Dempul kg

    T45#1# 942#

    PekerIa JH

     Fukang JH

    Kepala tukang JH

    an"or JH

    M4/#3#51 ' / $#517"$#517" 1p3/ !o#26 92#

  • 8/16/2019 Penawaran Bang Bobi

    16/31

    DAFTAR HARGA

    H DAN HARGA SATUAN BAHAN

    /

     I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.25000 p 2%34#.00 p 32,35.00

    2.50000 p 1213.10 p 3032.)5

    1.20000 p %52)5.00 p )#330.00

    0.00500 p 414)5.00 p 20).3#

    0.00,00 p )#015.00 p )02.14

    0.00)20 p 2414%#5.00 p 1)3#5.)3

    0.0%000 p 1,0)5.00 p 1144.50

    0.05000 p 2%)40.00 p 133).00

    0.45000 p 24)5,.00 p 11141.550.40000 p 54,50.00

    0.20000 p %#320.00

    0.02000 p ))2#0.00

    0.02000 p )2100.00

    p 14%21%.04

     Bumlah Harga

    P4/!$#"#5

    $#59 

     I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.01200 p 2414%#5.00 p 2#,)%.22

    0.00)00 p 2414%#5.00 p 1%,02.#0

    0.02000 p 1,0)5.00 p 3#1.50

    0.10000 p 54,50.00

    0.10000 p %#320.00

    0.01000 p ))2#0.00

    0.00500 p )2100.00

    p 4%2%0.52

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.10000 p 54,50.00 p (

    0.05000 p %#320.00 p (

    p (

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.)5000 p 54,50.00 p (

    0.02500 p %#320.00 p (

    p (

    H#21# S#"#5p#8

    H#21# S#"#5

    p#8

    H#21# S#"#5p#8

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    17/31

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.20000 p 2#000.00 p 33%00.00

    0.30000 p 54,50.00

    0.01500 p %#320.00

    p 33%00.00

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.20000 p 2,0#5.00 p 34,02.00

    0.30000 p 54,50.00

    0.01500 p %#320.00

    p 34,02.00

     Bumlah HargaP4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.4#000 p )0,45.00 p 34053.%0

    1,4.00000 p 1213.10 p 235341.40

    0.31200 p 414)5.00 p 12,40.20

    0.4%#00 p )%,%5.00 p 3%01,.%2

    )5.00000 p 14322.00 p 10)4150.00

    0.#0000 p 1,0)5.00 p 152%0.003.40000 p 54,50.00

    0.#5000 p %#320.00

    0.0#500 p ))2#0.00

    0.1)000 p )2100.00

    p 140))%4.#2

     Bumlah Harga

    P4/!$#"#5

    H#21# S#"#5p#8

    H#21# S#"#5p#8

    PB : - KR

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    18/31

     I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    32%.00000 p 1213.10 p 3,54)0.%0

    0.542#% p 414)5.00 p 22515.12

    0.)%222 p )#015.00 p 5,4%4.5,

    1.%5000 p 54,50.00

    0.2)500 p %#320.00

    0.02#00 p ))2#0.000.0#300 p )2100.00

    p 4))450.31

     Bumlah Harga

    P4/!$#"#5

    Rp -',%-.*

    I56493 H#21# S#"#5 B#8#5 H#21# S#"#5 p#8 J/$ H#21# B#8#5

    3)1.00000 p 1213.10 p 4500%0.10

    0.4,#5) p 414)5.00 p 20%)#.1,

    0.))55% p )#015.00 p %0505.31

    1.%5000 p 54,50.00

    0.2)500 p %#320.00

    0.02#00 p ))2#0.00

    0.0#300 p )2100.00

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    10.50000 p 14322.00 p 1503#1.00

    0.15000 p 1,0)5.00 p 2#%1.250.0)000 p 54,50.00

    0.0)000 p %#320.00

    0.00)00 p ))2#0.00

    0.00400 p )2100.00

    p 153242.25

     Bumlah Harga

     Bumlah per Kg

    P4/!$#"#5

    Indeks Harga Satuan Bahan Harga Satuan upah m! Harga Bahan

    10.20000 Rp 11,550.00 Rp 11,!10.00

    0.05000 Rp 1",05.00 Rp "5#.5

    0.02500 Rp 5$,"50.00

    0.02500 Rp %!,#20.00

    0.02500 Rp ,2!0.00

    0.00100 Rp 2,100.00

    "p 11#$%6&.%'

    &u'la( Harga

    &u'la( Per Kg

    Pembu!atan

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    H#21# S#"#5p#8

    H#21# S#"#5p#8

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    19/31

      0.04500 p 2414%#5.00 p 10#%%0.#3

    0.30000 p 1,0)5.00 p 5)22.50

    0.10000 p 5250.00 p 525.00

    0.30000 p 54,50.00

    0.2%000 p %#320.00

    0.02%00 p ))2#0.00

    0.00500 p )2100.00

    p 114,0#.33

     Bumlah HargaP4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.04000 p 2414%#5.00 p ,%5#).40

    0.40000 p 1,0)5.00 p )%30.00

    0.20000 p 5250.00 p 1050.00

    0.01500 p 2414%#5.00 p 3%220.2#

    0.35000 p 53%,0.00 p 1#),1.502.00000 p 2%34#.00 p 52%,%.00

    0.30000 p 54,50.00

    0.33000 p %#320.00

    0.03300 p ))2#0.00

    0.00%00 p )2100.00

    p 212,)5.1#

     Bumlah Harga

    P4/!$#"#5

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    20/31

     p 4#%23.)5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.50000 p 11445.00 p 1)1%).50

    0.15000 p 1,0)5.00 p 2#%1.25

    0.43000 p %%500.00 p 2#5,5.00

    0.20000 p 54,50.00

    0.%0000 p %#320.00

    0.0%000 p ))2#0.00

    0.01000 p )2100.00

     Bumlah Harga

    P4/!$#"#5

    p 4313,.53

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.50000 p 11445.00 p 1)1%).50

    0.15000 p 1,0)5.00 p 2#%1.25

    0.43000 p 53)4%.00 p 23110.)#0.20000 p 54,50.00

    0.%0000 p %#320.00

    0.0%000 p ))2#0.00

    0.01000 p )2100.00

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    25.00000 p 4550.00 p 113)50.0010.40000 p 1213.10 p 12%1%.24

    0.04500 p 414)5.00 p 1#%%.3#

    1.%2000 p 3150.00 p 5103.00

    0.%2000 p 54,50.00

    0.35000 p %#320.00

    0.03500 p ))2#0.00

    0.03000 p )2100.00

    p 133335.%2

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.50000 p %52)5.00 p 32%3).50

    0.01500 p 1,0)5.00 p 2#%.13

    0.00,%0 p 2414%#5.00 p 231#0.,#

    0.25000 p 52500.00 p 13125.00

    0.15000 p 54,50.00

    0.40000 p %#320.00

    0.25000 p ))2#0.00

    0.00125 p )2100.00p %,22,.%0

     Bumlah Harga

    P4/!$#"#5

    9# !437 8o$$o;

     H#21# S#"#5p#8

    2#519# !437 8o$$o;

     H#21# S#"#5p#8

    H#21# S#"#5p#8

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    21/31

     I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.02000 p %%500.00 p %)#30.00

    0.25000 p 350.00 p #).50

    0.20000 p 54,50.00

    0.10000 p %#320.00

    0.01000 p ))2#0.00

    0.01000 p )2100.00

    p %),1).50 Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.20000 p 24500.00 p 4,00.00

    0.15000 p 10500.00 p 15)5.00

    0.1)000 p 24500.00 p 41%5.00

    0.2%000 p 4,4,0.00 p 12#%).40

    0.0)000 p 54,50.000.0,000 p %#320.00

    0.00%00 p ))2#0.00

    0.00250 p )2100.00

    p 2350).40

     Bumlah Harga

    P4/!$#"#5

    H#21# S#"#5p#8

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    22/31

    L#p73 C#" D#3#2, L#p73 C#" P45"p )

     I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.10000 p 10500.00 p 1050.00

    0.11000 p 24500.00 p 2%,5.00

    0.2%000 p 21000.00 p 54%0.00

    0.04000 p 54,50.00

    0.12000 p %#320.000.01200 p ))2#0.00

    0.00200 p )2100.00

    p ,205.00

     Bumlah Harga

    P4/!$#"#5

    p 1,%02.04

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    0.3%400 p 53)4%.00 p 1,5%3.54

    0.11000 p 350.00 p 3#.500.10000 p 54,50.00

    0.05000 p %#320.00

    0.00500 p ))2#0.00

    0.00500 p )2100.00

     Bumlah Harga

    P4/!$#"#5

    I56493 H#21# S#"#5 B#8#5 J/$ H#21# B#8#5

    1.05000 p 5)54.00 p %041.)0

    0.15000 p ,5,).00 p 143,.55

    0.05000 p 54,50.00

    0.05000 p %#320.00

    0.00500 p ))2#0.00

    0.00300 p )2100.00

    p )4#1.25

     Bumlah Harga

    P4/!$#"#5

    H#21# S#"#5p#8

    ('*%*+) //, "4!#$ + //

     H#21# S#"#5p#8

    H#21# S#"#5p#8

  • 8/16/2019 Penawaran Bang Bobi

    23/31

  • 8/16/2019 Penawaran Bang Bobi

    24/31

     p 42,20.50

    Rp %,+*.**

     J/$ H#21# p#8

    p 1%4#5.00

    p 1024.#0

    p 1)50,.#0

    p 5110,.#0

    Rp ','**.**

     J/$ H#21# p#8

    p 1%4#5.00

    p 1024.#0

    p 1)50,.#0

    p 52411.#0Rp ,%'*.**

     J/$ H#21# p#8

    p 1#%#30.00

    p 5#0)2.00

    p %5%#.#0

    p 1225).00

    p 2%3)2).#0

    p 1%)14,2.%2

    Rp ',',%+*.**

  • 8/16/2019 Penawaran Bang Bobi

    25/31

     J/$ H#21# p#8

    p ,0%%).50

    p 1#)##.00

    p 21%3.#4p 5,#4.30

    p 11)%03.%4

    p 5,5053.,5

    Rp +,**.**

    Rp '',*-.%

     J/$ H#21# p#8

    p ,0%%).50

    p 1#)##.00

    p 21%3.#4

    p 5,#4.30

    p %4##4).24

    Rp %,%*.**

     J/$ H#21# p#8

    p 3#4%.50

    p 4)#2.40

    p 540.,%

    p 2##.40

    p ,45#.2%

    p 1%2)00.51

    p 1%2)0.05

    Rp ',*.**

    m! Harga upah

    Rp 1,##.5

    Rp 1,0!.00

    Rp 1,"#2.00

    Rp 2.10

    "p '$(#'.#'

    Rp 12#,!$".%0

    Rp 12,#!$."%

    "p 1)$(.((

     J/$ H#21# p#8

  • 8/16/2019 Penawaran Bang Bobi

    26/31

     

    p 1%4#5.00

    p 1))%3.20

    p 200,.2#

    p 3%0.50

    p 3%%1).,#

    p 15152%.31Rp '',*.**

     J/$ H#21# p#8

    p 1%4#5.00

    p 22545.%0

    p 2550.24

    p 432.%0

    p 42013.44

    p 254,##.%2

    Rp %,+*.**

  • 8/16/2019 Penawaran Bang Bobi

    27/31

     p 5)33,.#0

     J/$ H#21# p#8

    p 10,,0.00

    p 40,,2.00

    p 4%3%.#0

    p )21.00

    p 105,%3.55

    Rp '*,+*.**

    p 5)33,.#0

     J/$ H#21# p#8

    p 10,,0.00

    p 40,,2.00

    p 4%3%.#0

    p )21.00

    p 1004),.33

    Rp '**,%*.**

     J/$ H#21# p#8

    p 340%,.00

    p 23,12.00

    p 2)04.#0

    p 21%3.00

    p %2#4#.#0

    p 1,%1#4.42

    Rp '+,'*.**

     J/$ H#21# p#8

    p #242.50

    p 2)32#.00

    p 1,320.00

    p ,0.13p 54,#0.%3

    p 124210.23

    Rp '%,'*.**

  • 8/16/2019 Penawaran Bang Bobi

    28/31

     J/$ H#21# p#8

    p 10,,0.00

    p %#32.00

    p ))2.#0

    p )21.00

    p 1,315.#0p #)233.30

    Rp ,-*.**

     J/$ H#21# p#8

    p 3#4%.50p %14#.#0

    p 4%3.%#

    p 1#0.25

    p 10%3,.23

    p 3414%.%3

    Rp -%,'%*.**

  • 8/16/2019 Penawaran Bang Bobi

    29/31

     J/$ H#21# p#8

    p 21,#.00

    p #1,#.40p ,2).3%

    p 144.20

    p 114%).,%

    p 20%)2.,%

    Rp *,*.**

    p ,%5).,0

     J/$ H#21# p#8

    p 54,5.00

    p 341%.00

    p 3#%.40

    p 3%0.50

    p 2,25,.,4

    Rp +,*.**

     J/$ H#21# p#8

    p 2)4).50

    p 341%.00

    p 3#%.40

    p 21%.30

    p %)%%.20

    p 1424).45

    Rp '%,%*.**

  • 8/16/2019 Penawaran Bang Bobi

    30/31

    DAFTAR HASATUAN UPAH DAN HARG

    NO. ITEM MATERIAL

    A. ITEM UPAH

    1 PekerIa

    2 Fukang

    3 Kepala tukang

    4 an"or

    A. ITEM BAHAN

    1 -emen Portlan"

    2 Pasir $rug

    3 Pasir Pasang / *eton

    4 Fanah Fimbun

    5 *atu Peah 10 ( 15 m

    % *atu Peah 5 ( ) m

    ) *atu Peah 2 ( 3 m

    # *esi *eton $lir

    , Kaat *eton

    10 Ka>u Dolken/*ulat + 3@(4@

    11 Baring kaat baIa "ilas

    12 -eng 6elombang ) Kaki *BL- 20

    13 Papan ka>u kelas 888

    14 Paku biasa15 Paku -eng

    1% -eng plat bIls 3' %'

    1) &at eni *esi

    1# in>ak bekisting

    1, Fripleks , mm

    20 Papan 6&

    21 6>psum boar" tebal , mm

    22 rame 9lumunium hollo

    23 6enteng etal 03

    24 Paku sekrup

    25 linkote

    2% &at eni

    2) Plamir

    2# &at Dasar

    2, &at Kilat -etara *ee *ran"

    30 &at Fembok -etara Einile

    31 List g>psum pro?l 3@

    32 tepung g>psum/Dempul

    33 -emen arna

    34 Keramik 2020 m

  • 8/16/2019 Penawaran Bang Bobi

    31/31

      GASATUAN BAHAN

     HARGASATUAN

      (Rp.)

    54,50.00 JH

      %#320.00 JH

      ))2#0.00 JH

      )2100.00 JH

      1213.10 kg

      2#000.00 m3

      414)5.00 m3

      2,0#5.00 m3

      )0,45.00 m3

      )%,%5.00 m3

      )#015.00 m3

      14322.00 kg

      1,0)5.00 kg

      2%34#.00 btg

      11550.00 kg

      %52)5.00 bh

      2414%#5.00 kg

      1,0)5.00 kg  2%)40.00 kg

      %52)5.00 lbr

      24)5,.00 ltr

      5250.00 ltr

      53%,0.00 Lbr

      %%500.00 Lbr

      53)4%.00 lbr

      11445.00 Kg

      %%500.00 2

      350.00 Kg

      52500.00 kg

      24500.00 Kg

      10500.00 Kg

      24500.00 Kg

      4,4,0.00 Kg

      21000.00 Kg

      5)54.00 m

      ,5,).00 kg

      3150.00 kg

      4550.00 bh