KEBUTUHAN PEMBANGUNAN MUSHOLLA GODEAN NO BON TGL URAIAN PENGELUARA TGL NAMA 11/20/2014 TERIMA DANA 1,000,000 11/24/2014 Wadi 1 3 kwt Gamping 247,500 11/28/2014 Marto 2 2 kwt g ampingg 356,000 Marno 3 1 drum Air 65,000 Nanang 4 Air minum isi ulang 4,000 Samsul 5 1 galon air 40,000 Wasis 6 12/1/2014 TERIMA DANA 1,000,000 Ngaiman 7 12/2/2014 1 kol T koral 370,000 Kirno 8 11/29/2014 1/2 ton Gamping dll. 448,000 Bunomo 9 KONSUMSI 10 12/3/2014 Marto 11 Marno 12 Nanang 13 Samsul 14 Ngaiman 15 Wasis 16 Sutiati(wrg) 17 12/4/2014 TERIMA DANA 1,100,000 20 Jumlah 1,530,500 Biaya Tukang Total Uang Masuk 3,100,000 Keluarga Total Uang Kelua 3,110,500 Min (10,500) Hj. Yatmirah PEMASUKAN Rp. PENGELUARAN Rp. BBM operasional

description

nota pembelian

Transcript of Nota

Page 1: Nota

KEBUTUHAN PEMBANGUNAN MUSHOLLA GODEAN

NO BON TGL URAIAN PENGELUARAN UNTUK TUKANG

TGL NAMA X HARI Rp.11/20/2014 TERIMA DANA 1,000,000 11/24/2014 Wadi 30,000

1 3 kwt Gamping 247,500 11/28/2014 Marto 60.000 x 2 Hari 120,000 2 2 kwt g ampingg 356,000 Marno 60.000 x 2 Hari 120,000 3 1 drum Air 65,000 Nanang 55.000 x 2 Hari 110,000 4 Air minum isi ulang 4,000 Samsul 55.000 x 1 Hari 55,000 5 1 galon air 40,000 Wasis 50000 x 1 Hari 50,000 6 12/1/2014 TERIMA DANA 1,000,000 Ngaiman 50.000 x 1 Hari 50,000 7 12/2/2014 1 kol T koral 370,000 Kirno 50.000 x 1/2 Hari 25,000 8 11/29/2014 1/2 ton Gamping dll. 448,000 Bunomo 55000 x 1 Hari 55,000 9 KONSUMSI 2 Hari 150,000

10 12/3/2014 Marto 60000 x 3 Hari 180,000 11 Marno 60000 x 3 Hari 180,000 12 Nanang 55000 x 3 Hari 165,000 13 Samsul 55000 x 3 Hari 165,000 14 Ngaiman 50000 x 2 Hari 100,000 15 Wasis 50000 1/2 Hari 25,000 16 Sutiati(wrg) 3 Hari 200,000

17 1 mgu 150,000

12/4/2014 TERIMA DANA 1,100,000 20 Jumlah 1,530,500 Biaya Tukang 1,580,000

Total Uang Masuk 3,100,000 Keluarga Godean Tgl, 4/12/2014Total Uang Keluar 3,110,500 Min (10,500) Hj. Yatmirah Musdi