Download - Nota

Transcript
Page 1: Nota

KEBUTUHAN PEMBANGUNAN MUSHOLLA GODEAN

NO BON TGL URAIAN PENGELUARAN UNTUK TUKANG

TGL NAMA X HARI Rp.11/20/2014 TERIMA DANA 1,000,000 11/24/2014 Wadi 30,000

1 3 kwt Gamping 247,500 11/28/2014 Marto 60.000 x 2 Hari 120,000 2 2 kwt g ampingg 356,000 Marno 60.000 x 2 Hari 120,000 3 1 drum Air 65,000 Nanang 55.000 x 2 Hari 110,000 4 Air minum isi ulang 4,000 Samsul 55.000 x 1 Hari 55,000 5 1 galon air 40,000 Wasis 50000 x 1 Hari 50,000 6 12/1/2014 TERIMA DANA 1,000,000 Ngaiman 50.000 x 1 Hari 50,000 7 12/2/2014 1 kol T koral 370,000 Kirno 50.000 x 1/2 Hari 25,000 8 11/29/2014 1/2 ton Gamping dll. 448,000 Bunomo 55000 x 1 Hari 55,000 9 KONSUMSI 2 Hari 150,000

10 12/3/2014 Marto 60000 x 3 Hari 180,000 11 Marno 60000 x 3 Hari 180,000 12 Nanang 55000 x 3 Hari 165,000 13 Samsul 55000 x 3 Hari 165,000 14 Ngaiman 50000 x 2 Hari 100,000 15 Wasis 50000 1/2 Hari 25,000 16 Sutiati(wrg) 3 Hari 200,000

17 1 mgu 150,000

12/4/2014 TERIMA DANA 1,100,000 20 Jumlah 1,530,500 Biaya Tukang 1,580,000

Total Uang Masuk 3,100,000 Keluarga Godean Tgl, 4/12/2014Total Uang Keluar 3,110,500 Min (10,500) Hj. Yatmirah Musdi

PEMASUKAN Rp.

PENGELUARAN Rp.

BBM operasional