Transcript of Back Up Data Pondasi p3 & p4
REKAPITULASI PEKERJAAN PILE CAP (ADDENDUM I)PROYEK WARE HOUSE AMPLAS - MEDAN
BLOK B & C (57 UNIT)
NO URAIAN SATUAN VOLUME KETERANGAN
1 Galian tanah M3 233.1022 Beton lantai kerja, tb = 50mm, mutu K-100 M3 8.0383 Beton cor mutu K-225 M3 33.9844 Bekisting / acuan M2 129.6005 Pembesian:
- D 13mm Kg 1437.676
Medan, 25 Januari 2013Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY
SARIPUDDIN RAHMAD S.PROJECT MANAGER PIMPRO
PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I
TOTAL LUAS 25.277,70 M2 (57 UNIT) GALIAN TANAH PONDASI P3 & P4Tanggal: 25 Januari 2013
Sketsa:
NO.DIMENSI VOLUME JUMLAH PONDASI (UNIT) VOLUME/BLOK (m3)
Panjang (m') Lebar (m') Tinggi (m') BLOK B BLOK C BLOK B BLOK Ca b c d e= (b x c x d) f g h=(f x e) i= (g x e)
P3 1.40 1.40 1.45 2.842 38.00 18.00 107.996 51.156P4 1.00 1.00 1.450 1.450 11.00 40.00 15.950 58.000
JUMLAH TOTAL
Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY
HENDRA SAFRIZA THAMBOSSite Manager Site Manager
(m3)
BACK-UP DATA ADDENDUM I
GALIAN TANAH PONDASI P3 & P4Tanggal: 25 Januari 2013
TOTAL VOLUMEKETERANGAN
m3j= (h + i)159.15273.950
233.102
Diperiksa Oleh,BURSA PROPERTY
THAMBOSSite Manager
PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I
TOTAL LUAS 25.277,70 M2 (57 UNIT) BETON LANTAI KERJA K 100PONDASI P3 & P4Tanggal: 25 Januari 2013
Sketsa:
NO.DIMENSI VOLUME JUMLAH PONDASI (UNIT) VOLUME/BLOK (m3)
Panjang (m') Lebar (m') Tinggi (m') BLOK B BLOK C BLOK B BLOK Ca b c d e= (b x c x d) f g h=(f x e) i= (g x e)
P3 1.40 1.40 0.05 0.098 38.00 18.00 3.724 1.764P4 1.00 1.00 0.050 0.050 11.00 40.00 0.550 2.000
JUMLAH TOTAL
Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY
HENDRA SAFRIZA THAMBOSSite Manager Site Manager
(m3)
BACK-UP DATA ADDENDUM I
BETON LANTAI KERJA K 100PONDASI P3 & P4Tanggal: 25 Januari 2013
TOTAL VOLUMEKETERANGAN
m3j= (h + i)
5.4882.550
8.038
Diperiksa Oleh,BURSA PROPERTY
THAMBOSSite Manager
PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I
TOTAL LUAS 25.277,70 M2 (57 UNIT) MAL/ BEKISTING PONDASI P3 & P4Tanggal: 25 Januari 2013
Sketsa:
NO.DIMENSI VOLUME JUMLAH PONDASI (UNIT) VOLUME/BLOK (m3)
Sisi (m') Jumlah Segi Tinggi (m') (m2) BLOK B BLOK C BLOK B BLOK Ca b c d e= (b x c x d) f g h=(f x e) i= (g x e)
P3 1.20 4.00 0.30 1.440 38.00 18.00 54.720 25.920P4 0.80 4.00 0.300 0.960 11.00 40.00 10.560 38.400
JUMLAH TOTAL
Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY
HENDRA SAFRIZA THAMBOSSite Manager Site Manager
BACK-UP DATA ADDENDUM I
MAL/ BEKISTING PONDASI P3 & P4Tanggal: 25 Januari 2013
TOTAL VOLUMEKETERANGAN
m2j= (h + i)80.64048.960
129.600
Diperiksa Oleh,BURSA PROPERTY
THAMBOSSite Manager
PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I
TOTAL LUAS 25.277,70 M2 (57 UNIT) BETON COR MUTU K 225 PONDASI P3 & P4Tanggal: 25 Januari 2013
Sketsa:
NO.DIMENSI VOLUME JUMLAH PONDASI (UNIT) VOLUME/BLOK (m3)
Panjang (m') Lebar (m') Tinggi (m') BLOK B BLOK C BLOK B BLOK Ca b c d e= (b x c x d) f g h=(f x e) i= (g x e)
P3 1.20 1.20 0.30 0.432 38.00 18.00 16.416 7.776P4 0.80 0.80 0.300 0.192 11.00 40.00 2.112 7.680
JUMLAH TOTAL
Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY
HENDRA SAFRIZA THAMBOSSite Manager Site Manager
(m3)
BACK-UP DATA ADDENDUM I
BETON COR MUTU K 225 PONDASI P3 & P4Tanggal: 25 Januari 2013
TOTAL VOLUMEKETERANGAN
m3j= (h + i)24.1929.792
33.984
Diperiksa Oleh,BURSA PROPERTY
THAMBOSSite Manager
PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I
TOTAL LUAS 25.277,70 M2 (57 UNIT) PEMBESIAN D 13 mm PONDASI P3 & P4Tanggal: 25 Januari 2013
Sketsa:
TipeJLH. Panjang Jlh. Batang Volume Berat Besi JUMLAH PONDASI (UNIT) VOLUME/BLOK (m3) TOTAL VOLUME
KETERANGANPANJANG (m') (m') (Btg.) (m') (Kg) BLOK B BLOK C BLOK B BLOK C Kg
a b c d= (a+b+c) e f=(d x e) g h i j=(h x g) k= (i x g) l =(j +k)
P3 0.100 0.12 1.120 1.340 12.00 16.080 16.754 38.00 18.00 636.63 301.56 938.20 P4 0.100 0.12 0.720 0.940 10.00 9.400 9.794 11.00 40.00 107.73 391.75 499.48
TOTAL 1,437.68
Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY
HENDRA SAFRIZA THAMBOSSite Manager Site Manager
Besi D 10 mm - 15 cm
a
Tipe P3 = 12 Btg
ab b
c
a ab b
c
Tipe P4 = 10 Btg