Post on 27-Feb-2023
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1. 1
st 18.12.1976 Upper Indravati Project (MULTI
PURPOSE)
Orissa Major 77.66 185830 03.05.1978
2. 1st 18.12.1976 Singda Dam Multi-purpose Project Manipur Medium 7.93 4148 28.02.1977
3. 1st 18.12.1976 Banjar River Project Madhya
Pradesh
Medium 2.09 2428 03.02.1977
4. 1st 18.12.1976 Chaskaman Irrgation Project Maharas
htra
Major 22.48 17.02.1977
5. 1st 18.12.1976 Bateshwarsthan Pump Canal Phase-I Bihar Major 13.877 25749 25.01.1977
6. 1st 18.12.1976 Upper Pravara Project near Mhaladevi Maharas
htra
Major 15.868 19537 17.02.1977
7. 1st 18.12.1976 Suheli Irrigation Scheme Uttar
Pradesh
Major 6.4 17493 16.02.1977
8. 1st 18.12.1976 Sukhi Project Gujarat Major 23.11 21246 1.021977
9. 1st 18.12.1976 Thumblahalli Reservoir Scheme Tamil
Nadu
Medium 1.02 1282 08.02.1977
10. 1st 18.12.1976 Pambar Reservoir Scheme Tamil
Nadu
Medium 1.6 1618 08.02.1977
11. 1st 18.12.1976 Kerwan Tank Project Madhya
Pradesh
Medium 1.033 4047 16.02.1977
12. 1st 18.12.1976 Kothapally Lift Irrigation Scheme on
River Krishna
Andhra
Pradesh
Medium 2 4046 09.02.1977
13. 1st 18.12.1976 Krishnapuram Reservoir Scheme Andhra
Pradesh
Medium 1.28 2480
14. 1st 18.12.1976 Bijna Tank Project Madhya
Pradesh
Medium 1.206 2145 16.02.1977
15. 1st 18.12.1976 Godhatad Irrigation Gujarat Medium 0.478 780 02.02.1977
16. 1st 18.12.1976 Rajawal Irrigation Gujarat Medium 2.53 3278 03.02.1977
17. 1st 18.12.1976 Amipur Irrigation Scheme Gujarat Medium 2.79 6775 03.02.1977
18. 1st 18.12.1976 Sukhbhadar irrigation Scheme Gujarat Medium 2.26 6858 03.02.1977
19. 1st 18.12.1976 Peddavagu Reservoir Scheme Andhra
Pradesh
Medium 3.756 6474 07.02.1977
20. 1st 18.12.1976 Mukkamamidi Project Andhra
Pradesh
Medium 0.475 931 07.02.1977
21. 1st 18.12.1976 Beggulavagu Project Andhra
Pradesh
Medium 1.363 2085 07.02.1977
22. 1st 18.12.1976 Jurala Lift Irrigation Scheme on River
Krishna
Andhra
Pradesh
Medium 2024 17.02.1977
23. 1st 18.12.1976 Maddigeda Reservoir Andhra
Pradesh
Medium 1.553 1822 16.02.1977
24. 1st 18.12.1976 Taliparu Project Andhra
Pradesh
Medium 9.06 13965 23.03.1978
25. 1st 18.12.1976 Pedda Ankalam RegulatorScheme Andhra
Pradesh
Medium 1.028 3518 19.09.1979
26. 1st 18.12.1976 Pedderu Reservoir Scheme Andhra
Pradesh
Medium 1.5 1011 23.02.1977
LIST OF PROJECTS CONSIDERED AND ACCEPTED
BY TECHNICAL ADVISORY COMMITTEE
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n27. 1
st 18.12.1976 Jalleru Reservoir Scheme Andhra
Pradesh
Medium 2.186 2125 23.02.1977
28. 1st 18.12.1976 Raiwada Reservoir Scheme Andhra
Pradesh
Medium 8.88 8638 23.02.1977
29. 1st 18.12.1976 Suvwarmukid gomukhi Reservoir
Scheme
Andhra
Pradesh
Medium 8 8014 23.02.1977
30. 1st 18.12.1976 Anjanem Irrigation Project Goa Medium 3.6815 4830 22.02.1977
31. 1st 18.12.1976 Kalisagar Project Maharas
htra &
Madhya
Medium 3.225/2.42 4800 08.02.1977
32. 1st 18.12.1976 Vattivagu Scheme Andhra
Pradesh
Medium 5.4 9918 07.02.1977
33. 1st 18.12.1976 Mallurvagu Scheme Andhra
Pradesh
Medium 15.18 3039 07.02.1977
34. 1st 18.12.1976 Konam Reservoir Scheme Andhra
Pradesh
Medium 1.48 4007 07.02.1977
35. 1st 18.12.1976 Paronen Tank Project Madhya
Pradesh
Medium 1.09 2347 16.02.1977
36. 1st 18.12.1976 Mandohol Irrigation Scheme Maharas
htra
Medium 1.87 2606 19.03.1977
37. 1st 18.12.1976 Marhi Tank Project Madhya
Pradesh
Medium 1.465 607 16.02.1977
38. 1st 18.12.1976 Bisandha Tank Project Madhya
Pradesh
Medium 0.68 1048 08.02.1977
1.261 1265 16.02.197751. 1st 18.12.1976 Johilla Reservoir Project Madhya
Pradesh
Medium
50. 1st 18.12.1976 Mansurwari Tank Project Madhya
Pradesh
Medium 1.491 1802 16.02.1977
49. 1st 18.12.1976 Kachan Dam Project Madhya
Pradesh
Medium 2.1 3845 08.02.1977
0.655 943 08.02.1977
48. 1st 18.12.1976 Mahroi Tank Project Madhya
Pradesh
Medium 0.383
47. 1st 18.12.1976 Sonkhedsi Tank Project Madhya
Pradesh
Medium
607 16.02.1977
46. 1st 18.12.1976 Umrar Tank Project Madhya
Pradesh
Medium 19.15 2429 16.02.1977
45. 1st 18.12.1976 Talasara Irrigation Project Orissa Medium 2.173 2545 02.02.1977
1366
43. 1st 18.12.1976 Sarapgarh Irrigation Project Orissa Medium 1934
02.02.197744. 1st 18.12.1976 Jharbandha Irrigation project Orissa Medium 0.63
02.02.19771.146
0.505 5666 08.02.1977
42. 1st 18.12.1976 Soni Irrigation Project Gujarat Medium 1.824
41. 1st 18.12.1976 Baramandal Tank Project Madhya
Pradesh
Medium
02.02.19773240
40. 1st 18.12.1976 Gulabpura Tank Project Madhya
Pradesh
Medium 0.508 566 08.02.1977
39. 1st 18.12.1976 Modsagar Tank Project Madhya
Pradesh
Medium 0.964 1272 08.02.1977
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n
59. 1st 18.12.1976 Dhoba P.C. Scheme Uttar
Pradesh
Medium 0.75 4050 16.02.1977
60. 1st 18.12.1976 Shiva Canal Project Jammu
&
Medium 0.67 1011 15.02.1977
61. 1st 18.12.1976 Jammu
&
Medium 0.4 607 15.02.1977
62. 1st 18.12.1976 Chulki Nala Project Karnatak
a
Medium 37.976 4047 07.02.1977
63. 1st 18.12.1976 R.E of Nowi Basin Drainage Scheme West
Bengal
Flood
control
28.15
64. 1st 18.12.1976 Patna Flood Protection Scheme Bihar Flood
control
0.177
65. 2nd 28.04.1977 Karjan Project Gujarat Major 37.2 61973 18.05.1977
66. 2nd 28.04.1977 Lower Dudhana Project Maharas
htra
Major 22.3 29800
67. 2nd 28.04.1977 RE of Bhimsagar Irrigation Project Rajastha
n
Major 7.47 7900 12.03.1980
68. 2nd 28.04.1977 Palne Reservoir Scheme Bihar Medium 1.94 2368 08.02.1978
69. 2nd 28.04.1977 Jharjhia Reservoir Scheme Bihar Medium 4.46 5866 26.08.1977
70. 2nd 28.04.1977 Nakti Reservoir Scheme Bihar Medium 2.88 2315 20.02.1981
71. 2nd 28.04.1977 Kalubhar IrrigationScheme Gujarat Medium 3.13 3927 13.05.1977
72. 2nd 28.04.1977 Waghyanalla Tank Project Madhya
Pradesh
Medium 1.63 2308 24.05.1977
73. 2nd 28.04.1977 Jhirumnadi Diversion Scheme Madhya
Pradesh
Medium 0.39 2667 24.05.1977
74. 2nd 28.04.1977 NahlesarTank Project Madhya
Pradesh
Medium 1.96 4512 24.05.1977
75. 2nd 28.04.1977 RE of Patka Nalla Tank Project Madhya
Pradesh
Medium 0.68 1700 24.05.1977
76. 2nd 28.04.1977 Jarmora Tank Project Madhya
Pradesh
Medium 1.9 3030 24.05.1977
77. 2nd 28.04.1977 Chorborari Tank Madhya
Pradesh
Medium 0.64 829 04.06.1977
58. 1st 18.12.1976
56. 1st 18.12.1976 Umarhut Pump Canal Project Phase-I Uttar
Pradesh
Medium 0.778 3936
07.02.1977Karnatak
a
Medium 1.49 1417
17.02.1977
1.8 1133 07.02.1977Karnatak
a
Medium
Soudagar Tank Project
57. 1st 18.12.1976 Teetha Reservoir Project
55. 1st 18.12.1976 Kodumudiar Reservoir Scheme Tamil
Nadu
Medium 1.87 2509 08.02.1977
6.35 8010 05.04.1977
Bihar
54. 1st 18.12.1976 Bakhar Marihan Feeder Scheme Uttar
Pradesh
Medium
52. 1st 18.12.1976 Pandarwa Reservoir Scheme 31.03.1977
53. 1st 18.12.1976 Hirenalla Tank Project Medium
0.947 2068 16.02.1977
Karnatak
a
Medium 0.51 490
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n78. 2
nd 28.04.1977 Balar Reservoir Project Madhya
Pradesh
Medium 2.67 5567 24.05.1977
79. 2nd 28.04.1977 Matia Moti Nalla Project Madhya
Pradesh
Medium 1.61 4008 24.05.1977
80. 2nd 28.04.1977 Piparia Tank Project Madhya
Pradesh
Medium 3.89 6356 24.05.1977
81. 2nd 28.05.1977 Basapoawadi IrrigationScheme Maharas
htra
Medium 0.97 904 28.05.1977
82. 2nd 28.05.1977 Strengthening of Bhatghar Dam Maharas
htra
Medium 4.66 28.05.1977
83. 2nd 28.04.1977 Wabagai Barrage Project on Sekmai
River
Manipur Medium 2.59 8498 15.06.1977
84. 2nd 28.04.1977 Bondapipili Irrigation Project Orissa Medium 1.48 2250 27.06.1977
85. 2nd 28.04.1977 Kothari Irrigation Project Rajastha
n
Medium 2.35 4188 26.07.1977
86. 2nd 28.04.1977 Margia Irrigation Scheme Rajastha
n
Medium 0.59
87. 2nd 28.04.1977 Bardaha Dam Project Uttar
Pradesh
Medium 1.26 1255 20.05.1977
88. 2nd 28.04.1977 Urgent Development Works of
Sunderbans Area
West
Bengal
Flood
control
16.43
89. 3rd 26.08.1977 RE of Beas Unit-I Haryana,
Rajastha
n &
Major 382.57 16.03.1978
90. 3rd 26.08.1977 RE of Beas Unit- II Haryana
&
Major 259.8 1684227 23.01.1978
91. 3rd 26.08.1977 Hasdeo (Bango) Project Madhya
Pradesh
Major 115.3 327842 20.03.1980
92. 3rd 26.08.1977 RE of Gandak II Bihar Major 350.93 1299595 27.12.1977
93. 3rd 26.08.1977 RE of Rajasthan Canal Project Rajastha
n
Major 244.58
94. 3rd 26.08.1977 Haran Project Gujarat Major 25.26 36422 10.04.1978
95. 3rd 26.08.1977 Gundlavagu Project Andhra
Pradesh
Medium 1.16 1052 30.09.1977
96. 3rd 26.08.1977 Sathnala Project Andhra
Pradesh
Medium 3.21 7770 30.09.1977
97. 3rd 26.08.1977 Lohargarh Reservoir Scheme Bihar Medium 0.93 417 08.02.1978
98. 3rd 26.08.1977 Murahir Reservoir Scheme Bihar Medium 1.89 2104 12.10.1977
99. 3rd 26.08.1977 Nallur Amanikere Project Karnatak
a
Medium 1.90 1300 1977
100.
3rd 26.08.1977 Kodar Reservoir Project Madhya
Pradesh
Medium 2.94 16188 26.09.1977
101.
3rd 26.08.1977 Shamsherpura Tank Project Madhya
Pradesh
Medium 0.57 1065 26.09.1977
102.
3rd 26.08.1977 Rampura Khurd Project Madhya
Pradesh
Medium 1.5 3318 26.09.1977
103.
3rd 26.08.1977 Dholabaha Dam Project Punjab Medium 3.49 2261 27.09.1977
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n104.
3rd 26.08.1977 Margia Irrigation Scheme Rajastha
n
Medium 0.59 9480
105.
3rd 26.08.1977 Rohini Dam Project Uttar
Pradesh
Medium 0.7 1311 26.09.1977
106.
4th 30.11.1977 Upper Indravati Project Multipurpose Orissa Major 77.66 185830 03.05.1978
107.
4th 30.11.1977 Thein Dam Project Multipurpose Punjab
Rajastha
n J and
Major 263.16 348796 27.04.1982
108.
4th 30.11.1977 Rangwan Canal Revised Madhya
Pradesh
Major 3.17 17085 09.02.1978
109.
4th 30.11.1977 Revised Paralkote Dam Project Madhya
Pradesh
Major 5.27 14576 09.02.1978
110.
4th 30.11.1977 Increase in capacity of Deokali Pumped
Canal Scheme
Uttar
Pradesh
Major 14.29 81200 06.03.1979
111.
4th 30.11.1977 Urmil Dam Project Uttar
Pradesh
Major 8.56 4769 08.02.1978
112.
4th 30.11.1977 Extension and Improvement of
Irrigation on Shah Nehar Canal System
Punjab Major 10.62 64187 02.02.1978
113.
4th 30.11.1977 Bariarpur Left Bank Canal Project Madhya
Pradesh
Major 18.4 43850 09.03.1978
114.
4th 30.11.1977 Jaipur Reservoir Scheme Bihar Medium 0.47 534 08.02.1978
115.
4th 30.11.1977 Lorgara Reservoir Scheme Bihar Medium 0.55 417 08.02.1978
116.
4th 30.11.1977 Palna Reservoir Scheme Bihar Medium 1.94 2368 08.02.1978
117.
4th 30.11.1977 Sakrigali Pumped Canal Scheme Bihar Medium 0.61 2254 08.02.1978
118.
4th 30.11.1977 Bateswarasthan Pumped Canal Scheme Bihar Medium 2.97 6590 08.02.1978
119.
4th 30.11.1977 Fulzar II Irrigation Project Gujarat Medium 0.38 688 11.04.1978
120.
4th 30.11.1977 Koil Lift Irrigation Scheme Jammu
&
Kashmir
Medium 2.38 3036 09.02.1978
121.
4th 30.11.1977 Raipura (Tral) Lift Irrigation Scheme Jammu
&
Kashmir
Medium 2.13 2430 21.01.1979
122.
4th 30.11.1977 Tral Lift Irrigation Scheme Jammu
&
Kashmir
Medium 6.12 6000 02.01.1979
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n123.
4th 30.11.1977 Gandorinala Project Karnatak
a
Medium 7.71 8094 19.04.1978
124.
4th 30.11.1977 Upper Hirenala Project Karnatak
a
Medium 1.91 1902 19.04.1978
125.
4th 30.11.1977 Veerapur Tank Project Karnatak
a
Medium 3.85 4457 19.04.1978
126.
4th 30.11.1977 Karapuzha Irrigation Project Kerala Medium 7.6 9300 19.04.1978
127.
4th 30.11.1977 Attappady Irrigation Project Kerala Medium 8.42 8380
128.
4th 30.11.1977 Chandrakeshar Dam Project Madhya
Pradesh
Medium 3.17 4800 21.02.1978
129.
4th 30.11.1977 Amkoi Dam Project Madhya
Pradesh
Medium 0.6 613 21.02.1978
130.
4th 30.11.1977 Naktara Dam Project Madhya
Pradesh
Medium 0.46 511 21.02.1978
131.
4th 30.11.1977 Pendhari Nalla Project Maharas
htra
Medium 0.83 1836 09.02.1978
132.
4th 30.11.1977 Dongargaon Project Maharas
htra
Medium 1.06 1244 09.02.1978
133.
4th 30.11.1977 Pakadi Gudan Tank Project Maharas
htra
Medium 1.63 3229 09.02.1978
134.
4th 30.11.1977 Kanota Irrigation Project Rajastha
n
Medium 0.81 1440 17.01.1978
135.
4th 30.11.1977 Harai Reservoir Scheme West
Bengal
Medium 0.69
136.
4th 30.11.1977 Sone Embankment Scheme Bihar Flood
control
2.59
137.
4th 30.11.1977 Construction and Improvement of
Village Protection Works on the Right
Bank of River Gandak
U.P. &
Bihar
Flood
control
9.6
138.
4th 30.11.1977 Ghea-Kunti Basin Drainage Scheme West
Bengal
Flood
control
7.59
139.
4th 30.11.1977 Kunur River Embankment West
Bengal
Flood
control
4.01
140.
5th 20.02.1978 Left Bank Ghagra Canal Uttar
Pradesh
Major 78.68
141.
5th 20.02.1978 Upper Walhanga Project Wainganaga Madhya
Pradesh
Major 50.6 105200 09.08.1978
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n142.
5th 20.02.1978 Upper Krishna Project Stage-I (RE) Karnatak
a
Major 283.65 458500 22.04.1978
143.
5th 20.02.1978 Jhumka Nalla Tank Project Madhya
Pradesh
Medium 1.96 3000 23.04.1978
144.
5th 20.02.1978 Mand Diversion Project Madhya
Pradesh
Medium 2.89 13100 27.03.1978
145.
5th 20.02.1978 Bilaspur Diversion Project Madhya
Pradesh
Medium 0.95 5600 27.03.1978
146.
5th 20.02.1978 Ghunghutta Shyam Diversion Project Madhya
Pradesh
Medium 1.98 13100 27.03.1978
147.
5th 20.02.1978 Urmil Right Bank Canal Project Madhya
Pradesh
Medium 6.4 7700 27.03.1978
148.
5th 20.02.1978 Dholawad Tank Project Madhya
Pradesh
Medium 4.68 6500 27.03.1978
149.
5th 20.02.1978 Hiran-II Irrigation Project Gujarat Medium 4.48 4951 16.03.1978
150.
5th 20.02.1978 Kabutari Irrigation Project Gujarat Medium 1.13 1753 16.03.1978
151.
5th 20.02.1978 Mawal Lift Irrigation Scheme Jammu
&
Kashmir
Medium 4.32 11416 20.03.1978
152.
5th 20.02.1978 Laster Valley Irrigation Scheme Uttar
Pradesh
Medium 1.14 628 31.03.1978
153.
5th 20.02.1978 Gurma Nalla Project Madhya
Pradesh
Medium 2.31 22.01.1978
154.
5th 20.02.1978 Amarja Project Karnatak
a
Medium 5.7 8930 13.03.1978
155.
5th 20.02.1978 Upper Suktel Irrigation Project Orissa Medium 1.27 1519 21.03.1978
156.
6th 14.03.1978 Rengali Irrigation Project (Phase-I) Orissa Major 233.64 423600 31.03.1978
157.
6th 14.03.1978 Mahanadi Barrage Orissa Major 42.087 293138 11.04.1978
158.
6th 14.03.1978 Taliperu Project Andhra
Pradesh
Medium 9.06 13965 23.03.1978
159.
6th 14.03.1978 Anraj Reservoir Scheme Bihar Medium 2.64 4654 30.03.1978
160.
6th 14.03.1978 Badua Upper Nala Reservoir Project Bihar Medium 0.9 554 30.03.1978
161.
6th 14.03.1978 RE of Machhundri Irrigation Scheme Gujarat Medium 3.11 4466 11.04.1978
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n162.
6th 14.03.1978 RE of Shingoda Irrigation Scheme Gujarat Medium 3 4132 11.04.1978
163.
6th 14.03.1978 Bhabour Sahib Lift Irrigation Scheme Himacha
l
Pradesh
Medium 0.75 1200 30.03.1978
164.
6th 14.03.1978 RE of Lethpora Lift Irrigation Scheme Jammu
&
Kashmir
Medium 2.77 3846 10.04.1978
165.
6th 14.03.1978 Majhgaon Tank Project Madhya
Pradesh
Medium 0.94 1690 27.03.1978
166.
6th 14.03.1978 Sahibkhedi Irrigation Project Madhya
Pradesh
Medium 1.03 1458 27.03.1978
167.
6th 14.03.1978 Shivnath Diversion Project Madhya
Pradesh
Medium 0.59 2630 27.03.1978
168.
6th 14.03.1978 Ankargaon Tank Project Maharas
htra
Medium 0.63 1504 28.03.1978
169.
6th 14.03.1978 Hayiharajhor Irrigation Project Orissa Medium 7.25 12960 12.04.1978
170.
6th 14.03.1978 Lining of Faridkot Distributary System
Scheme
Punjab Medium 0.8 1462 31.03.1978
171.
6th 14.03.1978 Dhenkwah Bundh Scheme Uttar
Pradesh
Medium 0.89 1310 31.03.1978
172.
6th 14.03.1978 Dimu Irigation Scheme West
Bengal
Medium 0.28 470 30.03.1978
173.
6th 14.03.1978 RE of Machhu-II Irrigation Project Gujarat Medium 3.25 7402 11.04.1978
174.
7th 21.07.1978 Bansagar Project Unit-I Madhya
Pradesh
Major 91.31 248800 10.08.1978
175.
7th 21.07.1978 Construction of New Okhla Barrage Uttar
Pradesh
Major 25.37 0 09.08.1978
176.
7th 21.07.1978 Pahumara Irrigation Scheme Assam Medium 5 12950 04.09.1978
177.
7th 21.07.1978 Rupahi Irrigation Scheme Assam Medium 1.83 4937 04.09.1978
178.
7th 21.07.1978 Bilasi Reservoir Scheme Bihar Medium 1.46 2306 19.08.1978
179.
7th 21.07.1978 Mitti Irrigation Scheme Gujarat Medium 1.88 1571 11.08.1978
180.
7th 21.07.1978 Venue-II Irrigation Project Gujarat Medium 3.24 5285 11.08.1978
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n181.
7th 21.07.1978 RE of Phophal Irrigation Project Gujarat Medium 3.1 4056 11.08.1978
182.
7th 21.07.1978 Maskinala Project Karnatak
a
Medium 3.11 2832 05.08.1978
183.
7th 21.07.1978 Upper Mullamari Project Karnatak
a
Medium 3.28 3278 05.08.1978
184.
7th 21.07.1978 Khanha Bakut Project Madhya
Pradesh
Medium 1.6 4000 19.08.1978
185.
7th 21.07.1978 Ghongha Reservoir Project Madhya
Pradesh
Medium 2.15 7692 19.08.1978
186.
7th 21.07.1978 Mehgaon Tela Tank Project Madhya
Pradesh
Medium 1.38 1780 19.08.1978
187.
7th 21.07.1978 Vadivale Irrigation Project Maharas
htra
Medium 3.3 3886 11.08.1978
188.
7th 21.07.1978 Kalimatitola Tank Project Maharas
htra
Medium 1.24 4194 11.08.1978
189.
7th 21.07.1978 Morna Irrigation Project Maharas
htra
Medium 2.21 2240 11.08.1978
190.
7th 21.07.1978 Kanjhari Irrigation Project Orissa Medium 7.44 9200 08.08.1978
191.
7th 21.07.1978 Mokameh Tal Drainage Scheme Phase-
II
Bihar Flood
control
2.92
192.
7th 21.07.1978 Narayanpur Protection Scheme Bihar Flood
control
2.69
193.
7th 21.07.1978 Remodelling of Najafgarh drain
fromDhansa to Bharahnagar Bridge
Delhi Flood
control
18.77
194.
7th 21.07.1978 Jamuna Basin Drainage Scheme West
Bengal
Flood
control
5.38
195.
8th 17.11.1978 Arpa Project Madhya
Pradesh
Major 32.13 85000 22.02.1979
196.
8th 17.11.1978 Second RE of Sukla Irrigation Scheme Assam Medium 4.9 22509 06.02.1979
197.
8th 17.11.1978 Igo-Phey Irrigation Scheme of Leh Jammu
&
Kashmir
Medium 5.95 3316 02.01.1979
198.
8th 17.11.1978 Tral Lift Irrigation Jammu
&
Kashmir
Medium 6.12 6000 02.01.1979
199.
8th 17.11.1978 Raipura Lift Irrigation Scheme Jammu
&
Kashmir
Medium 2.13 2430 21.01.1979
200.
8th 17.11.1978 Lower Mulla Mari Project Karnatak
a
Medium 8.36 11340 15.01.1979
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n201.
8th 17.11.1978 Sakalda Tank Project Madhya
Pradesh
Medium 1.66 1671 23..01.1979
202.
8th 17.11.1978 RE of Bila Project Madhya
Pradesh
Medium 3.11 22.01.1979
203.
8th 17.11.1978 RE of Dudhawa Tank Project Madhya
Pradesh
Medium 4.3 22.01.1979
204.
8th 17.11.1978 Matiyari tank Project Madhya
Pradesh
Medium 4.83 9906 23.03.1979
205.
8th 17.11.1978 Khumari Nala Project Maharas
htra
Medium 0.81 1353 06.02.1979
206.
8th 17.11.1978 Harabangi Irrigation Project Orissa Medium 9.09 14475 05.02.1979
207.
8th 17.11.1978 Gumti Irrigation Scheme Tripura Medium 5.88 9800 19.01.1979
208.
8th 17.11.1978 Construction of Hulwana Diversion Drain Uttar
Pradesh
Flood
control
15.15
209.
9th 27.02.1979 Mahi-Bajaj Sagar Project Unit-I Gujarat
&
Rajastha
Major 67.33
210.
9th 27.02.1979 Mahi-Bajaj Sagar Project Unit-II Gujarat
&
Rajastha
Medium 35.81
211.
9th 27.02.1979 Dudhi River Project Madhya
Pradesh
Medium 2.86 4047 28.03.1979
212.
9th 27.02.1979 Choral River Project Madhya
Pradesh
Medium 3.96 4290 28.03.1979
213.
9th 27.02.1979 Chikutra Irrigation Project Maharas
htra
Medium 4.28 4696 21.04.1979
214.
9th 27.02.1979 Kalu Irrigation Project Maharas
htra
Medium 2.76 3540 2.04.1979
215.
9th 27.02.1979 Kasari Irrigation Project Maharas
htra
Medium 6.15 9458 21.04.1979
216.
9th 27.02.1979 Kadyi Irrigation Project Maharas
htra
Medium 3.47 9996 02.04.1979
217.
9th 27.02.1979 Medduvalasa Reservoir Project Andhra
Pradesh
Medium 8.45 9996 02.04.1979
218.
9th 27.02.1979 Drainage and Flood Plan for New Okhla
Industrial Development Area
Uttar
Pradesh
Flood
control
10.04
219.
9th 27.02.1979 Protection Works for Kosi Flood
Embankments and Afflux Bunds
Bihar Flood
control
3.05
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n220.
10th 06.06.1979 RE of Hasdeo Right Bank Canal Madhya
Pradesh
Major 13.38 41978 06.08.1979
221.
10th 06.06.1979 Cheyyeru Resureir Project Andhra
Pradesh
Major 9.15 9105 16.08.1979
222.
10th 06.06.1979 Bassi Rajastha
n
Major 2.33 2177 07.08.1979
223.
10th 06.06.1979 Gosunda Rajastha
n
Major 7.09 2177 07.08.1979
224.
10th 06.06.1979 Kodar Madhya
Pradesh
Major 25.75 7600 07.08.1979
225.
10th 06.06.1979 Sipu Reservoir Gujarat Major 18.8 22071 14.07.1980
226.
10th 06.06.1979 Hazipur-Bazidpur Embankment Scheme Bihar Flood
control
11.47
227.
11th 11.09.1979 Halali Project Madhya
Pradesh
Major 13.06 37626 26.07.1982
228.
11th 11.09.1979 Jankhari Reservoir Project Gujarat Major 18.69 20612 13.09.1982
229.
11th 11.09.1979 Rajghat Dam Madhya
Pradesh
& Uttar
Major 123.22 239241 25.07.1980
230.
11th 11.09.1979 RE of Bhadar Irrigation Project Gujarat Major 4.22 17166 20.11.1979
231.
12th 12.11.1979 Thoubal Multi-purpose Project Manipur Major 47.25 33400 01.05.1980
232.
12th 12.11.1979 Khowai Irrigation Project Tripura Medium 7.1 9320 20.03.1980
233.
12th 12.11.1979 Buridehingi Lift Irrigation Assam Medium 1.13 4696 11.02.1980
234.
12th 12.11.1979 Bundala Irrigation Project Madhya
Pradesh
Medium 2.18 3159 10.03.1980
235.
12th 12.11.1979 Chandora Tank Project Madhya
Pradesh
Medium 2.92 2773 10.03.1980
236.
12th 12.11.1979 Banki Tank Project Madhya
Pradesh
Medium 3.12 3441 10.03.1980
237.
12th 12.11.1979 Gomukh Project Madhya
Pradesh
Medium 3.5 6235 10.03.1980
238.
12th 12.11.1979 Seer Lift Irrigation Jammu
&
Kashmir
Medium 1.82 3590 11.02.1981
239.
12th 12.11.1979 Mondovi Irrigation Project Goa Medium 13.11 11200 1980
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n240.
12th 12.11.1979 RE of Potteru Irrigation Project Orissa Major 48.86 109000 12.12.1979
241.
12th 12.11.1979 Eastern Ganga Canal Project Uttar
Pradesh
Major 48.46 104555 17.03.1980
242.
12th 12.11.1979 RE of Bhimsagar Irrigation Project Rajastha
n
Medium 7.47 7900 12.03.1980
243.
12th 12.11.1979 Maudaha Dam Project Uttar
Pradesh
Major 26.75 28240
244.
12th 12.11.1979 Boralia Irrigation Project Assam Medium 6.77 13562 11.02.1980
245.
13th 19.03.1980 Thoubal Multi-purpose Project Manipur Major 47.25 33400 01.05.1980
246.
13th 19.03.1980 Champamati Irrigation Project Assam Major 15.32 24994 29.04.1980
247.
13th 19.03.1980 RE of Parallel Lower Ganga Canal
Project
Uttar
Pradesh
Major 49.42 89900 29.04.1980
248.
13th 19.03.1980 Project for replacement of Lahchura
Dam
Uttar
Pradesh
Major 8.52 50125 29.04.1980
249.
13th 19.03.1980 Project for Lining of Distributaries and
Minors
Punjab Major 152.03 1857638 03.07.1980
250.
13th 19.03.1980 North Koel Reservoir Project Bihar Major 113.77 53060
251.
13th 19.03.1980 Hawaipur Lift Irrigation Scheme Assam Medium 1.98 3887 25.02.1981
252.
13th 19.03.1980 Bah Project Madhya
Pradesh
Medium 13.98 11048 30.05.1980
253.
13th 19.03.1980 Sagar Project Madhya
Pradesh
Medium 10.63 9713 30.05.1980
254.
13th 19.03.1980 Doraha Project Madhya
Pradesh
Medium 2.48 2833 30.05.1980
255.
13th 19.03.1980 Kaliasote Project Madhya
Pradesh
Medium 9.32 11093 30.05.1980
256.
13th 19.03.1980 Tillar Dam Project Madhya
Pradesh
Medium 5.77 6000 30.05.1980
257.
13th 19.03.1980 Bankbal Irrigation Project Orissa Medium 5.72 7560 13.06.1980
258.
13th 19.03.1980 Kelia Irrigation Project Gujarat Medium 2.84 3341 14.05.1980
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n259.
13th 19.03.1980 Jhuj Irrigation Project Gujarat Medium 5.36 5600 14.05.1980
260.
13th 19.03.1980 Chhapi Irrigation Project Rajastha
n
Medium 5.9 6437 04.06.1980
261.
13th 19.03.1980 Bilas Irrigation Project Rajastha
n
Medium 2.7 2547 22.07.1980
262.
13th 19.03.1980 Ferozepura Storage Scheme Jammu
&
Kashmir
Medium 13.12
263.
13th 19.03.1980 Varnow Storage Scheme Jammu
&
Kashmir
Medium 5.54
264.
13th 19.03.1980 Khuga Irrigation Project Manipur Medium 15 14755 25.07.1980
265.
13th 19.03.1980 Sonkh Irrigation Maharas
htra
Medium 3.52 2834 14.05.1980
266.
13th 19.03.1980 Mandovi Irrigation Project Goa Medium 13.1 11200 1980
267.
13th 19.03.1980 Krishnapuram Reservoir Scheme Andhra
Pradesh
Medium 2.46 2480
268.
13th 19.03.1980 Patna Flood protection Scheme Bihar Flood
control
27.13
269.
13th 19.03.1980 Flood protection Scheme (Phase I &II)
under Ghatal Master Plan
West
Bengal
Flood
control
49.17
270.
14th 07.06.1980 Second RE of Pamba Irrigation Project Kerala Major 42.97 41682 24.07.1980
271.
14th 07.06.1980 Second RE of Periyar Valley Project Kerala Major 39.71 85600 24.07.1980
272.
14th 07.06.1980 Second RE of Haripura Reservoir Uttar
Pradesh
Major 6.91 20000 25.07.1980
273.
14th 07.06.1980 RE of the Western Kosi Canal Project Bihar Major 161.8 219000 25.07.1980
274.
14th 07.06.1980 Mahi Project Madhya
Pradesh
Major 61.52 26429 01.01.1985
275.
14th 07.06.1980 Upper Kangsabati West
Bengal
Major 43.84 59000
276.
14th 07.06.1980 Tangon Valley Project West
Bengal
Major 13.6
277.
14th 07.06.1980 Bamangola-Habibpur Irrigation Scheme West
Bengal
Major 21.67
278.
14th 07.06.1980 RE of Kanupur Canal Scheme Andhra
Pradesh
Medium 4.94 4027 24.06.1980
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n279.
14th 07.06.1980 Guhai Irrigation Scheme Gujarat Medium 9.32 8326 30.12.1980
280.
14th 07.06.1980 Harnav Projec Stage-II Gujarat Medium 3.49 3440 12.02.1981
281.
14th 07.06.1980 Budhana Nalla Project Madhya
Pradesh
Medium 1.99 2349 25.07.1980
282.
14th 07.06.1980 Khuga Irrigation Project Manipur Medium 15 14755 25.07.1980
283.
14th 07.06.1980 Sawan Bhadon Irrigation Project Rajastha
n
Medium 4.18 4908 25.07.1981
284.
14th 07.06.1980 Repairs and Strengthening of Nanak
Sagar Dam
Uttar
Pradesh
Medium 3.32 24.07.1980
285.
15th 28.11.1980 RE of Pazhassi Irrigation Project Kerala Major 42 32400 20.01.1981
286.
15th 28.11.1980 RE of Loktak Lift Irrigation Project Manipur Major 16.86 40000 24.02.1981
287.
15th 28.11.1980 RE of Kallada Irrigation Project Kerala Major 163.57 92800 27.01.1981
288.
15th 28.11.1980 Punasi Reservoir Project Bihar Major 26.09
289.
15th 28.11.1980 Construction of Bhimgoda Barrage
Project
Uttar
Pradesh
Major 22.45 12.03.1981
290.
15th 28.11.1980 Mahi Irrigation Project Madhya
Pradesh
Major 61.52 26429 01.01.1985
291.
15th 28.11.1980 Modernisation of existing channels
(Phase-I)
Haryana Major 77.11 96377 22.02.1982
292.
15th 28.11.1980 Rajghat Canal Project Madhya
Pradesh
Major 46.15 97158 23.03.2001
293.
15th 28.11.1980 Masan Reservoir Project Bihar Major 34.73
294.
15th 28.11.1980 RE of Giri Irrigation Project Himacha
l
Pradesh
Medium 6.57 4000 16.03.1981
295.
15th 28.11.1980 Lakhundar Dam Project Madhya
Pradesh
Medium 4.26 4050 25.02.1981
296.
15th 28.11.1980 Hawaipur Lift Irrigation Scheme Assam Medium 1.98 3887 25.02.1981
297.
15th 28.11.1980 Chirapani Project Madhya
Pradesh
Medium 8.57 8000 25.02.1981
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n298.
15th 28.11.1980 Vembakottai Reservoir Project Tamil
Nadu
Medium 3.65 3279 20.01.1981
299.
15th 28.11.1980 Effluent Irrigation Scheme from Okhla
Treatment Plant to Mehrauli and
Najafgarh
Delhi Medium 6.86 8016 20.01.981
300.
15th 28.11.1980 Manu Irrigation Project Tripura Medium 8.18 7580 25.02.1981
301.
15th 28.11.1980 Hadaf Irrigation Scheme Gujarat Medium 6.77 4950 11.02.1981
302.
15th 28.11.1980 Badanala Irrigation Project Orissa Medium 11.39 8653 07.01.1981
303.
15th 28.11.1980 Kasartera Project Madhya
Pradesh
Medium 6.01 9473 25.02.1981
304.
15th 28.11.1980 Nakti Reservoir Scheme Bihar Medium 4.14 2315 20.02.1981
305.
15th 28.11.1980 Narihalla Project Karnatak
a
Medium 3.5
306.
15th 28.11.1980 Vamanapuram Irrigation Project Kerala Medium 36.4 18041 13.12.1982
307.
15th 28.11.1980 Natuwadi Irrigation Scheme Maharas
htra
Medium 8.29
308.
15th 28.11.1980 Protection works for Kosi Flood
Embankments and Afflux bunds
Bihar Flood
control
2.89
309.
15th 28.11.1980 Strengthening of embankment and anti-
erosion works between 3.9 to 35 kms in
Piprasi pipraghat Embankments
Bihar Flood
control
2.9
310.
15th 28.11.1980 Estimate for Revetment and slope
protection works along Right Bank of
River Ganga Between Digha to
Didargani
Bihar Flood
control
1.55
311.
15th 28.11.1980 Construction of Supplementary Drain Delhi Flood
control
25.07
312.
16th 28.03.1981 Muvattupuzhe Valley Irrigation Project Kerala Major 48.08 39048 06.06.1983
313.
16th 28.03.1981 Sri Sailem Right Bank Canal Project Andhra
Pradesh
Major 220.22 76890 16.05.1981
314.
16th 28.03.1981 Nandur Medhmeshwar Project Maharas
htra
Major 72.66
315.
16th 28.03.1981 Samakoi Irrigation Project Orissa Major 26.35
316.
16th 28.03.1981 Sajnam Dam Project Uttar
Pradesh
Major 8.44 7145 15.05.1981
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n317.
16th 28.03.1981 RE of Khera Canal Project Uttar
Pradesh
Medium 4.18 7500 26.05.1981
318.
16th 28.03.1981 RE of Som Kagdar Irrigation Project Rajastha
n
Medium 22.3 5739 27.09.1992
319.
16th 28.03.1981 RE of Deo Irrigation Scheme Gujarat Medium 12
320.
16th 28.03.1981 Kunwari Lift Irrigatio0n Scheme Madhya
Pradesh
Medium 1.03 3926 02.05.1981
321.
16th 28.03.1981 Demi II Irrigation Scheme Gujarat Medium 5.37 3437 04.05.1981
322.
16th 28.03.1981 Aji III Irrigation Scheme Gujarat Medium 13.23 6837 04.05.1981
323.
16th 28.03.1981 Aji II Irrigation Scheme Gujarat Medium 6.22 2390 04.05.1981
324.
16th 28.03.1981 Latratu Reservoir Project Bihar Medium 10.98 10200 25.05.1981
325.
16th 28.03.1981 Tapkara Reservoir Project Bihar Medium 2.03 1860 25.05.1981
326.
16th 28.03.1981 Sulu Reservoir Project Bihar Medium 3.12 4441 25.05.1981
327.
16th 28.03.1981 Tarlo Reservoir Project Bihar Medium 5.73 1225 25.05.1981
328.
16th 28.03.1981 Sonua Reservoir Scheme Bihar Medium 8.92 4696 25.05.1981
329.
16th 28.03.1981 Nandini Reservoir Project Bihar Medium 4.47 4098 25.05.1981
330.
16th 28.03.1981 Kasarsai Irrigation Project Maharas
htra
Medium 2.7 3643 04.05.1981
331.
16th 28.03.1981 Khairi Irrigation Project Maharas
htra
Medium 2.37 1961 04.05.1981
332.
16th 28.03.1981 Kumbhi Lift Irrigation Project Maharas
htra
Medium 5.16 8887 04.05.1981
333.
16th 28.03.1981 Andhra Reservoir Scheme Andhra
Pradesh
Medium 5.4
334.
16th 28.03.1981 Jhanjhavathi Reservoir Project Andhra
Pradesh
Medium 15.09
335.
16th 28.03.1981 Noupur Irrigation Project Maharas
htra
Medium 1.89 2242 04.05.1981
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n336.
16th04.
05.1981
28.03.1981 Palsi Medium Irrigation Project Maharas
htra
Medium 3.18 2550 04.05.1981
337.
16th 28.03.1981 Sindwarni Reservoir Project Bihar Medium 4.45
338.
16th 28.03.1981 Karwappa Nalla Irrigation Project Maharas
htra
Medium 4.7 4725 04.05.1981
339.
16th 28.03.1981 Dongargaon Tank Irrigation Project Maharas
htra
Medium 2.15 3737 04.05.1981
340.
16th 28.03.1981 Khudia Reservoir Project Bihar Medium 1.31
341.
16th 28.03.1981 Extension of Kamla-Balan Embankment
Phase 1 from Darjia to Kotharam
Bihar Flood
Control
4.93
342.
16th 28.03.1981 Anti-erosion works and Retired
embankment from 0-35 KM in Piprasi-
Pipraghat reach on Right Bank of the
Gandak
Bihar Flood
Control
3.92
343.
17th 24.07.1981 Shahipur Kandi Barrage and Power
Plant Scheme
Punjab 124.3
344.
17th 24.07.1981 RE of Lakhwar Vyasi Pariojana Uttar
Pradesh
Major 252.02
345.
17th 24.07.1981 RE of Tawi Lift Irrigation Scheme Jammu
&
Kashmir
Major 7.12 13036 24.09.1981
346.
17th 24.07.1981 Puthimari Irrigation Project Assam Major 25.82
347.
17th 24.07.1981 Muvattpuzha Valley Irrigation Project Kerala Major 48.08 39046 06.06.1983
348.
17th 24.07.1981 Rangawali River Medium Irrigation
Project
Maharas
htra
Medium 3.52 3290 20.10.1981
349.
17th 24.07.1981 Amarawati River Medium Irrigation
Project
Maharas
htra
Medium 4.63 3252 20.10.1981
350.
17th 24.07.1981 Sonwad Medium Irrigation Project Maharas
htra
Medium 3.13 2361 20.10.1981
351.
17th 24.07.1981 Shahanur River Medium Irrigation
Project
Maharas
htra
Medium 8.77 9556 20.10.1981
352.
17th 24.07.1981 Koradi Nalla Medium Irrigation Project Maharas
htra
Medium 3.79 4832 20.10.1981
353.
17th 24.07.1981 Borgaon Tank Project Maharas
htra
Medium 1.61 2634 20.10.1981
354.
17th 24.07.1981 Delhi River Medium Irrigation Project Maharas
htra
Medium 6.48 4353 20.10.1981
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n355.
17th 24.07.1981 Bahula River Medium Irrigation Project Maharas
htra
Medium 5.91 4654 20.10.1981
356.
17th 24.07.1981 Hivra River Medium Irrigation Project Maharas
htra
Medium 3.43 2521 20.10.1981
357.
17th 24.07.1981 Madan Tank Medium Irrigation Project Maharas
htra
Medium 3.08 3280 20.11.1981
358.
17th 24.07.1981 Anjani River Medium Irrigation Project Maharas
htra
Medium 4.91 3669 20.11.1981
359.
17th 24.07.1981 Torna River Medium Irrigation Project Maharas
htra
Medium 1.46 1849 20.11.1981
360.
17th 24.07.1981 Mun River Medium Irrigation Project Maharas
htra
Medium 5.34 11060 20.11.1981
361.
17th 24.07.1981 Dakranala Pump Canal Scheme Bihar Medium 4.75 4024 17.10.1981
362.
17th 24.07.1981 Kansbahal Medium Irrigation Project Orissa Medium 5.39 7640 29.09.1981
363.
17th 24.07.1981 Upper Jonk Irrigation Project Orissa Medium 12.77 13890 29.09.1981
364.
17th 24.07.1981 Bhadar Reservoir Project (Panchmahals) Gujarat Medium 13.11 5480 20.10.1981
365.
17th 24.07.1981 Balh Valley Irrigation Project Himacha
l
Pradesh
Medium 3.02
366.
17th 24.07.1981 Buti Nala Irrigation Project Maharas
htra
Medium 8.82 11060 20.11.1981
367.
17th 24.07.1981 Pohar Nala Irrigation Project Maharas
htra
Medium 6.62 10205 20.11.1981
368.
17th 24.07.1981 Garada Irrigation Project Rajastha
n
Medium 10.21
369.
17th 24.07.1981 Kasjor Reservoir Project Bihar Medium 8.66 6340 17.10.1981
370.
17th 24.07.1981 Upper Sankh Reservoir Project Bihar Medium 9.18 7110 17.10.1981
371.
17th 24.07.1981 Vaniar Reservoir Project Tamil
Nadu
Medium 5.6 3460 24.09.1981
372.
17th 24.07.1981 Ichambadi Anicut Tamil
Nadu
Medium 2.29 2529 24.09.1981
373.
17th 24.07.1981 Anti-erosion works on Left Bank ofRiver
Ganga
Bihar FC 4.99
374.
17th 24.07.1981 RE of Darbhanga Town Protection work
Scheme
Bihar FC 3.14
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n375.
17th 24.07.1981 RE of Buxar Koelwar Embankment Bihar FC 26.28
376.
18th 23.11.1981 Subernarekha Multipurpose Project Bihar 480.9
377.
18th 23.11.1981 Shahpur Kandi Barrage and Power Plant
Scheme
Punjab 124.3
378.
18th 23.11.1981 RE of LakhwarVyasi Project Uttar
Pradesh
276.42
379.
18th 23.11.1981 Kanhar Irrigation Project Uttar
Pradesh
Major 89.74
380.
18th 23.11.1981 Lower Dudha Project Maharas
htra
Major 53.2 36733 31.03.1983
381.
18th 23.11.1981 RE of Bardikarai Irrigation Scheme Assam Major 14.87 27530 02.03.1982
382.
18th 23.11.1981 Modernisation of Existing channels Haryana Major 77.11 95377 22.02.1982
383.
18th 23.11.1981 Siktia Barrage Project Bihar Major 66.03
384.
18th 23.11.1981 RE of Salauli Irrigation Project Goa Major 35.2903 05.06.1982
385.
18th 23.11.1981 RE of Potteru Irrigation Project Orissa Major 58.41 109000 06.03.1982
386.
18th 23.11.1981 RE of the Phulwara Reservoir Scheme Bihar Major 21.56 9532 15.10.1982
387.
18th 23.11.1981 Surangi Reservoir Scheme Bihar Medium 2.14 1529 01.03.1982
388.
18th 23.11.1981 Sukli Project Rajastha
n
Medium 5.48
389.
18th 23.11.1981 RE of Koil Lift Irrigation Scheme Jammu
&
Kashmir
Medium 5.56 2327 04.09.1982
390.
18th 23.11.1981 Ramrekha Reservoir Project Bihar Medium 6.86
391.
18th 23.11.1981 RE of Strengthening of Sardasagar Dam Uttar
Pradesh
Medium 6.48
392.
18th 23.11.1981 Devarjan Medium Irrigation Project Maharas
htra
Medium 1.52 1880 24.02.1982
393.
18th 23.11.1981 Rui Medium Irrigation Project Maharas
htra
Medium 1.78 1650 24.02.1982
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n394.
18th 23.11.1981 RE of Tral Lift Irrigation Scheme Jammu
&
Kashmir
Medium 14.91 6000
395.
18th 23.11.1981 RE of Rajpore Lift Irrigation Scheme Jammu
&
Kashmir
Medium 8.46 2430
396.
18th 23.11.1981 Bandia Nalla Irrigation Project Madhya
Pradesh
Medium 1.8 2478 01.03.1982
397.
18th 23.11.1981 Kanhargaon Tank Irrigation Project Madhya
Pradesh
Medium 5.22 3724 01.03.1982
398.
18th 23.11.1981 RE of Wagon Irrigation Project Rajastha
n
Medium 5.5 10556 20.02.1982
399.
18th 23.11.1981 Baski Irrigation-cum-Water Supply
Project
Bihar Medium 13.02
400.
18th 23.11.1981 Rongai Valley Irrigation Project Meghala
ya
Medium 4.2
401.
18th 23.11.1981 Panzan Irrigation Project Maharas
htra
Medium 2.5
402.
18th 23.11.1981 Parwan Lift Irrigation Scheme Rajastha
n
Medium 3.79 5976 07.04.1982
403.
18th 23.11.1981 Vamanapuram Irrigation Project Kerala Medium 36.4
404.
18th 23.11.1981 Tamluk Drainage Scheme in the Distt of
Midnapora (Phase-I&II)
West
Bengal
FC 8.48 02.03.1982
405.
19th 03.03.1982 Subernrekha Multipurpose Project Orissa 221.63
406.
19th 03.03.1982 Bagmati Irrigation and Flood Control
Project
Bihar 185.7
407.
19th 03.03.1982 Second RE of Kuttiadi Irrigation Project Kerala Major 44.84 31161
408.
19th 03.03.1982 Kanhar Irrigation Project Uttar
Pradesh
Major 89.4603 05.06.1982
409.
19th 03.03.1982 RE of Salauli Irrigation Project Goa Major 35.29
410.
19th 03.03.1982 Panzan Irrigation Project Maharas
htra
Medium 2.5 2011 15.04.1982
411.
19th 03.03.1982 Parwan Lift Irrigation Scheme Rajastha
n
Medium 3.79 5976 07.04.1982
412.
19th 03.03.1982 Vamanapuram Irrigation Project Kerala Medium 36.4 18014 13.12.1982
413.
19th 03.03.1982 Mazam Irrigation Project Gujarat Medium 10.99 5259 16.04.1982
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n414.
19th 03.03.1982 RE of Imphal Barrage Manipur Medium 4.62 6400 14.04.1983
415.
19th 03.03.1982 Umaria Irrigation Project Gujarat Medium 2.82 2345 31.03.1984
416.
19th 03.03.1982 Barni Irrigation Project Rajastha
n
Medium 5.25
417.
19th 03.03.1982 Lhasi Irrigation Project Rajastha
n
Medium 5.44
418.
19th 03.03.1982 Kelavarapalli Reservoir Scheme Tamil
Nadu
Medium 5.51
419.
19th 03.03.1982 Ajgaibinath Pump Canal Scheme Bihar Medium 16.8
420.
19th 03.03.1982 Constn. Of Ujina Diversion Drain &
Remodelling Ujina Drainage System
Haryana FC 31.67
421.
19th 03.03.1982 Constn. Of Baria Sansartola Bund Uttar
Pradesh
FC 2.91
422.
20th 10.05.1982 RE of Upper Krishna Project Stage-I Karnatak
a
1214.97 458500 24.09.1990
423.
20th 10.05.1982 Narayanpur dam to its ultimate height
of 492.25m
Karnatak
a
424.
20th 10.05.1982 Narayanpur L.B.C. 78 km long &
distribution system to irrigate annually
an area of 4.41 lakh ha.
Karnatak
a
425.
20th 10.05.1982 Almattio dam for an FRL of 512.20 m Karnatak
a
426.
20th 10.05.1982 Almatti L.B.C. 50 km long & distribution
system to irrigate annually an area of
.17 lakh ha.
Karnatak
a
427.
21st 08.07.1982 Chimoni Irrigation Project Kerala Major 23.43
428.
21st 08.07.1982 Tilaiya Dhadhar Diversion Project Bihar Major 46.74
429.
21st 08.07.1982 Auranga Reservoir Project Bihar Major 125.4
430.
21st 08.07.1982 Lower Tirna Project Maharas
htra
Major 37.65
431.
21st 08.07.1982 Jaspur Reservoir Project Haryana Major 29.41
432.
21st 08.07.1982 Dhanaura Reservoir Project Haryana Major 30.68
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n433.
21st 08.07.1982 Raqmpuri Pick Up Weir Cum Pulpulla
Dummy Storage Irrigation Project
Madhya
Pradesh
Medium 6.34
434.
21st 08.07.1982 Dokariya Tank Irrigation Project Madhya
Pradesh
Medium 2.28 2924 14.01.1983
435.
21st 08.07.1982 Dejla Dewda Irrigation Project Madhya
Pradesh
Medium 16.43 12150 14.01.1983
436.
21st 08.07.1982 Dhan-Singh Toli Reservoir Scheme Bihar Medium 4.76
437.
21st 08.07.1982 Bethali Irrigation Project Rajastha
n
Medium 5.25
438.
21st 08.07.1982 Bori River Irrigation Project Maharas
htra
Medium 7.62
439.
21st 08.07.1982 Patgaon Irrigation Project Maharas
htra
Medium 7.39 8792 04.05.1985
440.
21st 08.07.1982 Hatwane Irrigation Project Maharas
htra
Medium 19.55
441.
21st 08.07.1982 Protection works for Kosi Flood
Embankments
Bihar FC 5.13
442.
22nd 06.01.1983 Sardar Sarovar Project Uttar
Pradesh
4240
443.
22nd 06.01.1983 Siktia (Ajoy) Barrage Project Bihar Major 66.03
444.
22nd 06.01.1983 Raising of Kota Barrage Rajastha
n
Major 0.91
445.
22nd 06.01.1983 Kanchi Irrigation Project Bihar Major 4.85
446.
22nd 06.01.1983 Chimoni Irrigation Project Kerala Major 23.43
447.
22nd 06.01.1983 Mahi Irrigation Project Madhya
Pradesh
Major 61.52 26429 01.01.1985
448.
22nd 06.01.1983 Rajghat Canal Irrigation Scheme Madhya
Pradesh
Major 46.15
449.
22nd 06.01.1983 Auranga Reservoir Project Bihar Major 125.4 55405 15.09.1985
450.
22nd 06.01.1983 RE of Phulwaria Reservoir Scheme Bihar Medium 21.56 9532 15.10.1984
451.
22nd 06.01.1983 Satpotka Reservoir Bihar Medium 5.95
452.
22nd 06.01.1983 Uben Irrigation Scheme Gujarat Medium 12.49 2198 20.01.1993
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n453.
22nd 06.01.1983 RE of Sekmai Barrage Project Manipur Medium 5.37 8498 03.10.1983
454.
22nd 06.01.1983 Deo Irrigation Project Orissa Medium 52.23 15645 29.06.1992
455.
22nd 06.01.1983 Urmodi Irrigation Project Maharas
htra
Medium 18.85 10640 02.03.1984
456.
22nd 06.01.1983 RE of Ranapratap Sagar Project
(Chambal Stage II )
Rajastha
n
36.41
457.
22nd 06.01.1983 RE of Torai Reservoir Project Bihar Medium 15.97
458.
22nd 06.01.1983 RE of Sunder Reservoir Bihar Medium 6.44
459.
22nd 06.01.1983 RE of Gumani Reservoir Bihar Medium 18.71
460.
22nd 06.01.1983 Piplad Irrigation Project Rajastha
n
Medium 5.07
461.
22nd 06.01.1983 RE of Somkagdor Irrigation Project Rajastha
n
Medium 22.3 5739 27.09.1993
462.
22nd 06.01.1983 Barnai Tank Project Madhya
Pradesh
Medium 4.26 2388 13.07.1983
463.
22nd 06.01.1983 Baghua Irrigation Project Orissa Medium 6.35 7440 11.04.1983
464.
22nd 06.01.1983 Barchar Nalla Tank Project Madhya
Pradesh
Medium 3.78
465.
23rd 03.03.1983 RE of Ranapratap Sagar Project
(Chambal Stage II)
Madhya
Pradesh
&
36.41
466.
23rd 03.03.1983 Tilliya Dhadhar Diversion Project Bihar Major 46.74
467.
23rd 03.03.1983 RE of Phulwaria Reservoir Scheme Bihar Major 21.56 9532 15.10.1984
468.
23rd 03.03.1983 RE of Sunder Reservoir Project Bihar Medium 6.44
469.
23rd 03.03.1983 RE of Gumani Reservoir Project Bihar Medium 18.71
470.
23rd 03.03.1983 RE of Torai Reservoir Project Bihar Medium 15.97
471.
23rd 03.03.1983 RE of Somkagdar Irrigation Project Rajastha
n
Medium 22.3 5739 27.09.1993
472.
23rd 03.03.1983 Piplad Irrigation Project Rajastha
n
Medium 5.07
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n473.
23rd 03.03.1983 Barnai Tank Project Madhya
Pradesh
Medium 4.26 2388 13.07.1983
474.
23rd 03.03.1983 Baghua Irrigation Project Orissa Medium 6.35 7440 11.04.1983
475.
23rd 03.03.1983 Barchar Nalla Tank Project Madhya
Pradesh
Medium 3.78
476.
23rd 03.03.1983 Amwakhas Spur Project on Right Bank
of Gandak in U.P.
Uttar
Pradesh
Flood
Control
3.22
477.
23rd 03.03.1983 RE for Sone Embankment Scheme Bihar FC 4.31
478.
24th 07.06.1983 Lower Godavari (Vishnuouri) Project Maharas
htra
Major 78.93
479.
24th 07.06.1983 Mahan Irrigation Project (Stage I) Madhya
Pradesh
Major 39
480.
24th 07.06.1983 Barari Pumped Cabal Scheme Bihar Medium 9.83
481.
24th 07.06.1983 Katri Reservoir Scheme Bihar Medium 7.28
482.
24th 07.06.1983 Barnai Tank Project Madhya
Pradesh
Medium 4.26 2388 13.07.1983
483.
24th 07.06.1983 RE for revetment and slope protection
works along the right bank of river
Ganga
Bihar FC 2.7
484.
24th 07.06.1983 Protection works for Kosi flood
Embankments
Bihar FC 3.49
485.
25th 01.12.1983 Sindh Rivor Irrigation Project Ph. II Madhya
Pradesh
Major 185
486.
25th 01.12.1983 Watrak Reservoir Project Gujarat Major 43.71 16874 26.03.1992
487.
25th 01.12.1983 Subarnarekha Barrage Project West
Bengal
Major 215.61 114200 1995
488.
25th 01.12.1983 Modernisation of existing Kharjcut Canal
System
Gujarat Medium 8.1 10500 Add/.
2365
20.02.1992
489.
25th 01.12.1983 Umaria Irrigation Scheme Gujarat Medium 2.823 2345 31.03.1984
490.
25th 01.12.1983 Uben Irrigation Project Gujarat Medium 12.49 2198 20.01.1993
491.
25th 01.12.1983 Titilagarh Irrigation Project Orissa Medium 21.13 2950 21.10.1993
492.
25th 01.12.1983 Banghalati (Bahuda Stage.II) Irrigation
Project
Orissa Medium 45.44 6050 21.05.1995
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n493.
25th 01.12.1983 Urmodi Irrigation Project Maharas
htra
Medium 18.846 10640 02.03.1984
494.
25th 01.12.1983 Sina (Nimgaon) Irrigation Project Maharas
htra
Medium
495.
25th 01.12.1983 Panchana Irrigation Project Rajastha
n
Medium 17.45
496.
25th 01.12.1983 Salayia Reservoir Scheme Bihar Medium 5.952
497.
25th 01.12.1983 Kesho Reservoir Scheme Bihar Medium 6.082
498.
25th 01.12.1983 Ramrokha Reservoir Scheme Bihar Medium 8.761
499.
25th 01.12.1983 Dhansingh toil Reservoir Scheme Bihar Medium 6.379
500.
25th 01.12.1983 Satpotka Reservoir Scheme Bihar Medium 0.666
501.
26th 22.03.1984 Narmadasagar Project Indira Sagar
project.
Madhya
Pradesh
Major 1994 44363 06.09.1989
502.
26th 22.03.1984 Man Irrigation Project Madhya
Pradesh
Major 44.1 17700 05.06.1992
503.
26th 22.03.1984 Modernisation of Kangsabati Reservoir
Project
West
Bengal
Major 232.84 401660
504.
26th 22.03.1984 Konar Irrigation of Project Medium Major 93.614
505.
26th 22.03.1984 Subernarekha Barrage Project Bihar Major 15.85
506.
26th 22.03.1984 Wagan Irrigation Project Rajastha
n
Medium 98.2
507.
26th 22.03.1984 Khairi Irrigation Project Maharas
htra
Medium 4.967
508.
26th 22.03.1984 Panchkhero Reservoir Bihar Medium 7.404
509.
26th 22.03.1984 Revised estimate of Rajpura Lift
Irrigation
Jammu
&
Kashmir
Medium 70.3 2430
510.
26th 22.03.1984 Bhairwa Reservoir Scheme Bihar Medium 84.81
511.
26th 22.03.1984 Baski Reservoir-cum-water Supply
Scheme
Bihar Medium 13.02
512.
26th 22.03.1984 Panzan (Nagya-Sakya) Project Maharas
htra
Medium 54.153 2011
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n513.
26th 22.03.1984 Shahanoor Irrigation on Project Maharas
htra
Medium 15.238
514.
27th 03.09.1984 Singur Storage Project (Irrigation &
W.S)
Andhra
Pradesh
M. P. 42.03
515.
27th 03.09.1984 Hatwane Modium Irrigation project Maharas
htra
Medium 24.521
516.
27th 03.09.1984 Goj Project Madhya
Pradesh
Medium 87.95
517.
27th 03.09.1984 Jobat Irrigation Project Madhya
Pradesh
Medium 30.75 12507 02.01.1985
518.
27th 03.09.1984 Mun Medium Irrigation Project Maharas
htra
Medium 13.874
519.
27th 03.09.1984 Tembhapuri Medium Irrigation Project Maharas
htra
Medium 18.09 4784 13.07.1995
520.
27th 03.09.1984 Bor, Dahogaon Modium Irrigation
Project
Maharas
htra
Medium 16.27 2218 06.11.1996
521.
27th 03.09.1984 Sakoi Modium Irrigation Project Maharas
htra
Medium 3.014
522.
27th 03.09.1984 Raigaon Medium Irrigation project Maharas
htra
Medium 3.179
523.
27th 03.09.1984 Buggavanka Reservoir Scheme Andhra
Pradesh
Medium 78.27
524.
27th 03.09.1984 Bandi Sendra Medium Irrigation Project Rajastha
n
Medium
525.
27th 03.09.1984 Modernisation of Gambhiri Canal System Rajastha
n
Medium 11.762
526.
27th 03.09.1984 Second Rovisod estimate of Western
Kosi Canal Project
Bihar Major 2.222 Nepal portion-
15300 Bihar
portion-
219000527.
27th 03.09.1984 Revised estimate of Badlaghat-
Nagarpara Embankment Scheme
Bihar Major 5.309
528.
27th 03.09.1984 Estimate for Anti-erosion works and
Retired Embankment from 0.35 Km. in
Piprasi-Pipraghat Reach on Right Ban of
Gandak
Bihar Major 6.59
529.
28th 24.09.1984 Modernisation of Sone Canals Project Bihar Major 11.947
530.
28th 24.09.1984 Revised Estimates for Ravi Canal Project Jammu
&
Kashmir
Major 62.08 53927
531.
28th 24.09.1984 Sutlei – Yamuna Link Canal Project Part-
I
Punjab Major 17.6
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n532.
28th 24.09.1984 Sutlei – Yamuna Link Canal Project Part -
III
Punjab Major 54.2
533.
28th 24.09.1984 Uppar sakari Reservoir Project Bihar Major 12.382
534.
28th 24.09.1984 Mahi Irrigation Project Madhya
Pradesh
Major 61.525 26429 01.01.1985
535.
28th 24.09.1984 Sapna & Bodjore Intergrated Irrgn.
Project
Orissa Medium 14.57 3752 6.10.1989
536.
28th 24.09.1984 Kusoi project Orissa Medium 27.034
537.
28th 24.09.1984 Kharmuza Lift Irrigation Scheme Assam Medium 9.861
538.
28th 24.09.1984 Revised estimate of Palar-Porandalar
Reservoir Project
Tamil
Nadu
Medium 56.5 2010
539.
28th 24.09.1984 Kundghat Reservoir Scheme Bihar Medium 56.004
540.
28th 24.09.1984 Shivna Takli Project Maharas
htra
Medium 13.187
541.
28th 24.09.1984 Gopad Lift Irrigation Scheme Madhya
Pradesh
Medium 34.376
542.
28th 24.09.1984 Mahuar Irrigation project Madhya
Pradesh
Medium 18.67
543.
28th 24.09.1984 North-Mand Medium Irrigation Project Maharas
htra
Medium 67.059
544.
28th 24.09.1984 Tarali Medium Irrigation Project Maharas
htra
Medium 14.074
545.
28th 24.09.1984 Dehali Medium Irrigation Project Maharas
htra
Medium 9.827
546.
28th 24.09.1984 Protecdtion works for Kosi Flood
Embankment
BIHAR FC 5.915
547.
29th 26.2.1985 Tehri Dam Project Uttar
Pradesh
Major 1605.86
548.
For Protection of Palasbari and Gumi
(Kandalpara) area from the eresion of
River Brahmaputra
Assam FC 10.276
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n549.
30th Regardeig discussion on Approch
Doucument for the 7th Plan. (Clearance
of New /R.E/ Unapproved Project taken
up by the State Govts./ integrated
development of Catchment and Comm
land aareas/Review of the Procedure
and time limit for examination of the
Sch
550.
30th 19.07.1985 Lower Damoder Drainage Scheme West
Bengal
FC 14.4
551.
31st 25.07.1985 Karatia Nagartala Basin Drainage
Scheme
West
Bengal
FC O6.56
552.
31st 25.07.1985 Sri Ram Sagar Irrigation Andhra
Pradesh
Major 87.002
553.
32ND 28.11.1985 Sutlej-Yamuna Link Canal Punjab Major 272
554.
32nd 28.11.1985 Shivna Takli Medium irrigation Project Maharas
htra
Medium 12.9969
555.
32nd 28.11.1985 Barcharanla irrigation Project Madhya
Pradesh
Medium 7.54
556.
32nd 28.11.1985 KenharGaon Tank irrigation Project Madhya
Pradesh
Medium 8.6467
557.
32nd 28.11.1985 DEhali irrigation Project (REVD). Maharas
htra
Medium 9.8275
558.
32nd 28.11.1985 Sankh irrigation Project Maharas
htra
Medium 7.1724
559.
32nd 28.11.1985 Sepnal irrigation Project Maharas
htra
Medium 6.9257
560.
32nd 28.11.1985 Meja Modernisation and Meja Feeder Rajastha
n
Medium 42.217
561.
32nd 28.11.1985 Javapur Tower Projection works Uttar
Pradesh
F.C. 23.93
562.
33RD 21.3.1986 Kanpur irrigation Project Uttar
Pradesh
Major 86.03
563.
33rd 21.3.1986 Gyanpur Pump Canal Project Uttar
Pradesh
Major 73.3885 6541533rd
564.
33rd 21.3.1986 Watrak Reservoir Project Gujarat Major 22
563.
33rd 21.3.1986 Indira Gandhi Nahar Project Stage II Rajastha
n
Major 943.24
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n564.
33rd 21.3.1986 Raising Meja Dam Uttar
Pradesh
Major 29.69
565 33rd 21.3.1986 Rengali Multipurpose Project (REVD) Orissa M.P. 196.39
566 33RD 21.3.1986 Srisailam Rignt Bank Canal Project
(REVD).
Andhra
Pradesh
Major 386.05
567 33rd 21.3.1986 Potterv irrigation Project (REVD) ORISSA Major 69.74
568 33rd 21.3.1986 Singda Dam Project Manipur Medium 19.89
569 34th 13/14/15.5.1
986
Punjab irrigation Project-Phase II Punjab Major 452.57
570 34th 13/14/15/.5.
1986Loictak Lift irrigation Scheme (2
nd
REVD)
Manipur Major 24.4
571 34th 13/14/15.5.1
986
Modified Som Kamla Amba irrigation
Project
Rajastha
n
Major 58.01
572 34th 13/14/15.5.1
986
Saryu Pump Canal Uttar
Pradesh
Major 8.25
573 34th 13/14/15.5.1
986
Exacavation of Right Side Channel
Above Sathhnur Pick-UP Aniwt
Tamil
Nadu
Major 4.05
574 34th 13/14/15.5.1
986Khoupam Dam Project (2
nd REVD.) Manipur Major 2.98
575 34th 13/14/15.5.1
986
Paimar irrigation Scheme (REVD) Bihar Major 2.69
576 34th 13/14/15.5.1
986Phulwaria Reservoir (2
nd REVD) Bihar Major 31.37
577 34th 13/14/15.5.1
986Udarasthan irrigation Scheme (1
st
REVD).
Bihar Major 4.4
578 34th 13/14/15.5.1
986
Parambikulam Aaliyar Project Tamil
Nadu
Major 84.9
579 34th 13/14/15.5.1
896
Ruphi irrigation Scheme (REVD) Assam Major 4.95
580 34th 13/11/15.5.1
896
Masalga Medium irrigation Project. Maharas
htra
Medium 4.63
581 34th 13/11/15.5.1
896
Modernisation of Ananthnar Channel Tamil
Nadu
Medium 3.48
582 34th 13/11/15.5.1
896
Dekodong irrigation Scheme (REVD). Assam Medium 4.6
583 34th 13/11/15.5.1
896
Kusoi irrigation Project Orissa Medium 27.03
584 34th 13/11/15.5.1
896
Ghaken irrigation Project Rajastha
n
Medium 4.04
585 34th 13/11/15.5.1
896
Morna (Guroghar) irrigation Project Maharas
htra
Medium 9.42
586 34th 13/11/15.5.1
986
Kar River Medium Project Maharas
htra
Medium 8.02
587 34th 13/11/15.5.1
986
Som Kagdar irrigation Project (REVD). Rajastha
n
Medium 17.5
588 34th 13/11/15.5.1
986
Jam River Medium Project Maharas
htra
Medium 11.75
589 34th 13/14/15.5.1
986
Chavli irrigation Project. Bihar Medium 8.71
590 34th 13/14/15.5.1
986
Khudin Reservoir Cum Modernisation
Project.
Bihar Medium 5.07
591 34th 13/14/15.5.1
986.Kaliaber Lift irrigation Scheme (2
nd
REVD)
Assam Medium 8.51
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n592 34
th 13/14/15.5.1
986
Bhavour Sahib Lift irrigation Scheme-PH
II
Himacha
l
Medium 4.26
593 34th 13/14/15.5.1
986
Darjane irrigation Project (REVD). Orissa Medium 9.09
594 34th 13/14/15.5.1
986
Adhwara Flood Control Scheme-PH-I Bihar F.C. 17.22
595 34th 13/14/15.5.1
986
Drainage Scheme for Bhagwanpur-
Nandigram Area.
West
Bengal
F.C. 3
596 34TH 13/14/15.5.1
986
Increasing Capacim of Najafgarm Drain
from Dhansa Bund To Bharat Nagar
Bridge
Delhi F.C. 37.11
597 35TH 15/16/10.19
86
u.p.Composite irrigation Project-
Modernisation of upper Ganga Canaal
Uttar
Pradesh
Major 251
598 35th 15/16/10.19
86
Hippargi irrigation Project Karnatak
a
Major 186.7
599 35th 15/16/10.19
86
Kanupur irrigation Scheme Orissa Major 86.03
600 35th 15/16/10.19
86
Northend irrigation Project Maharas
htra
Medium 6.71
601 35th 15/16/10.19
86
Karamuzha Lift irrigation Scheme Assam Medium 9.86
602 35th 15/16/10.19
86
Protection of Mukulmua (Howlighat)
And ITS Adjoining Area From Erosion of
The Brahamapuira
Assam Flood
Control
5.18
603 35th 15/16/10.19
86
Anti-Erosion Scheme for Protection of
Bokakhat And Kaziranga Area
(Moribholla) from Erosion of The
Bizahmaputra
Assam Flood
Control
10.46
604 35th 15/16/10.19
86
Karatia Nagartala Basin Drainage
Scheme in The District of 24 Pargonos
West
Bengal
Flood
Control
6.56
605 35th 15/16/10.19
86
Haroagong-Kultigong Basin Drainage
Scheme (Sunti Basin) Phase-I In District
Barasat
West
Bengal
Flood
Control
7.73
606 35th 15/16/10.19
86
Scheme for Construction of Marginal
Embankment on Bcth Banks of River
Ami from Kauriram To Gorakhpur-Khaini
Road in Gorakhpur District
Uttar
Pradesh
Flood
Control
4.53
33 Irrigation Schemes In Advanced
Stages of Constrvction Listed Down
Separately & Attached.
2429
1433 2000
7692
607 R.E. on Batane Reservoir scheme . Bihar Major 18.5579
608 R.E. on Sajnam Dam Project. Uttar
Pradesh
Major 1266
609 R.E. on Kangsabati Reservoir Project. West
Bengal
Major 10016
610 Revised Estimate of Kosi Irrog. Scheme. Uttar
Pradesh
Major 1732.31
611 R.E. of Manjra Irrgn. Project Maharas
htra
Major 3160.47
612 R.E. of Thandava Reservoir Project Andhra
Pradesh
Major 1519.11
35TH 15/16/10.19
86
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n613 R.E. on Sir Arthur Cotton Barrage
Project (Godavari Barrage Project)
Andhra
Pradesh
Major 8602
614 Revised Estimated of Augasi Pump
Canal
Uttar
Pradesh
Major 3.27
615 R.E. on Aliganj Sinchai Pariyojna Uttar
Pradesh
Major 696
616 R.E. of Baigul Reservoir Scheme Uttar
Pradesh
Major 718
617 R.E. on adwa dam Project Uttar
Pradesh
Major 766.3
618 Suheli Irrigation Scheme Uttar
Pradesh
Major 640
619 Modhotande Irrigation Project Uttar
Pradesh
Major 280.46
620 R.E. of Bhimgoda Barrage Project Uttar
Pradesh
Major 3302
621 Khatima Irrigation Scheme Uttar
Pradesh
Major 217.57
622 Second Revised Estimate of
Chitturpuzha Irrigation Project
Kerala Major 1763.71
623 Increasing Capacity of the Bipipur lake Haryana Major 149.07
624 R. E. on Jaipur Reservoir Scheme Bihar Medium 262.75
625 R.E. of Lorgara Reservoir Scheme Bihar Medium 198.88
626 R.E. on Rohini Dam Project Uttar
Pradesh
Medium 3316
627 R.E. of Murahir Reservoir scheme Bihar Medium 703.84
628 R.E. of Ganga Pump Canal Scheme at
Chausa
Bihar Medium 591
629 R.E. of Tapkara Reservoir Bihar Medium 400.5
630 R.E. of Srajgarha Pump Canal Scheme Bihar Medium 427.51
631 R.E. of Latratu Reservoir scheme Bihar Medium 2523.9
632 R.E. of the Sakrigal Pump Canal scheme Bihar Medium 307.5
633 R.E. of kakurjahap (Anjan) Rescrvoir
Scheme
Bihar Medium 2102.43
634 R.E. of the Torlow Reservoir Scheme Bihar Medium 1068.73
635 R.E. of Shah Nahar Feeder Project Punjab Medium 3345
636 Second Revised Estimate of Lethpora
Lift Irrigation Scheme
Jammu
&
Medium 4.76 2429 10.04.1976
637 R.E. of the Rajal Lift Irrigation Scheme Jammu
&
Medium 5.5748 1433
638 R.E. of Ranjan Lift Irrigation Scheme Jammu
&
Medium 6.31 2000
35TH 15/16/10.19
86
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n639 2
nd Revised Estimate of the Marval Lift
Irrigation Scheme
Jammu
&
Medium 7.17 7692 20.03.1978
640 36th
Meeti
ng
8.12.1986 Indira Gandi Naher Project Stage II
Revised
Rajastha
n
Major 13.31
641 36th 8.12.1986 Man Irrigation Project Madhya
Pradesh
Major 44.1
642 36th 8.12.1986 Kanhar Irrigation Project Uttar
Pradesh
Major 107.44
643 36th 8.12.1986 Lohoru Canal life Irrigation Scheme Haryana Major 34.53
644 36th 8.12.1986 Phoba Pump Canel Scheme Uttar
Pradesh
Medium 3.498
645 36th 8.12.1986 Protection Works for Kosi Flood
Embankment
Bihar F.C. 16.92
646 37th
Meeti
ng
22.6.1987 Srisailam Right Bronch Canal Andhra
Pradesh
Major 386.05,23.52
647 37th 22.6.1987 Remedial Measures on Cracks in
Hirekud Dam
Orissa Major 8.33
648 37th 22.6.1987 Resteretion of downstram and upstream
Flexible Protection and upstream divicle
wells of Kosi Project
Bihar Major 12.43
649 37th 22.6.1987 Warm Irrigation Project Maharas
htra
Major 331.36
650 37th 22.6.1987 Revised Estimate of kaldiye Irrigation
Scheme
Assam Medium 8.11
651 37th 22.6.1987 Revised Estimate of Gunta Dom Project Uttar
Pradesh
Medium 7.92
652 37th 22.6.1987 Protections Works for Kosi Embankment Bihar F.C. 16.92
653 37th 22.6.1987 Anti-eroisoon works and retired en-bank
ment from O TO 35 in Piprasi-Pipraghet
reach on right Bank of Gondok.
Bihar F.C. 17.6
654 38th 27.1.1988 Integreted Project for development of
water legged areas of South Weotem
districts of Panjab.
Punjab New
Major
50.87
655 38th 27.1.1988 Punjab Irrigetion Project Phase-II-
Lining of Water Course
West
Bengal
Major Alt-I-
226.33,Alt-II-
215.61656 38
th 27.1.1988 Moderaination of Kongsaboti Project West
Bengal
Major 311.07
657 38th 27.1.1988 Gosi Khurd Project Maharas
htra
Major 461.19
658 38th 27.1.1988 Hathnikund Barrage Project Haryana Major 42.37
659 38th 27.1.1988 SYL Canal Part-IMain Canal Punjab Revised
Major
366
660 38th 27.1.1988 Mahenedi Barrage Orissa Revised
Major
42.058
661 38th 27.1.1988 Upper Krishna Project Stage-I Karnatak
a
Revised
Major
1249.15
662 38th 27.1.1988 Vath vagv Medium Irrigation Project Andhra
Pradesh
Revised
Medium
28.7075
35TH 15/16/10.19
86
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n663 38
th 27.1.1988 Madhav lose irrigation Project Andhra
Pradesh
Revised
Medium
38.89
664 38th 27.1.1988 Andhre irrigation Project Andhra
Pradesh
Revised
Medium
13.1256
665 38th 27.1.1988 Raghurare Irrigation Scheme Assam Revised
Medium
26.8464
666 38th 27.1.1988 Hatwane Project Maharas
htra
Revised
Medium
45.87
667 38th 27.1.1988 Imphal Barrage Project. Manipur Revised
Major
6.3368
668 38th 27.1.1988 Sunder Irrigation Project Orissa Revised
Major
8.2067
669 38th 27.1.1988 Vengalareva Sengram Project Andhra
Pradesh
Revised
Major
23.8015
670 38th 27.1.1988 Project Estimate of flood Preventoin
works at Allahabed Phase-II
Uttar
Pradesh
F.C. 6
671 38th 27.1.1988 Sitapar Town Flood Protection Scheme Uttar
Pradesh
F.C. 6.01
672 38th 27.1.1988 Lower Damadar Drainage Scheme West
Bengal
F.C. 14.4
673 39th
Meeti
ng
12.4.1988 Raising lining of Bhakra Main line to
restore it, authensed Capacity
Punjab New
Major
82.725
674 39th 12.4.1988 Supdementary note on GosiKhurd
Irrigation Project
Maharas
htra
Major 461.19
675 39th 12.1.1988 Iurela Project Andhra
Pradesh
Major 204.75
676 39th 12.1.1988 Karanya Project Karnatak
a
Major 98
677 39th 12.1.1988 Telugu Genge Project Andhra
Pradesh
Major 834.49
678 39th 12.1.1988 Nauargeon Tank Project Maharas
htra
New
Medium
5.2603
679 39th 12.1.1988 Bah Irrigation Project Madhya
Pradesh
Medium 29.92
680 39th 12.1.1988 Birupe Genguti Island Project Orissa Medium 4.6302
681 39th 12.1.1988 Benetura Irrigation Project Maharas
htra
Medium 4.0-137
682 39th 12.1.1988 Dnged Irrigation Project Maharas
htra
Medium 4.636
683 39th 12.1.1988 Upper Maner Project Maharas
htra
Medim 26.18342
684 39th 12.1.1988 Varadragasawani Guddi Project Andhra
Pradesh
Medium 13.9667
685 39th 12.1.1988 Supplenentery Note on Baghlati
Irrigation Project
Orissa Medium 12.4922
686 39th 12.1.1988 Ragional Tra Irrigation Project (NEC) Medium 15.56
687 39th 12.1.1988 Revised Estimate of Gumti Irrigation
Project
Tripura Revised
Medium
19.35
688 40th 17.8.1988 Warna Irrigation Project Maharas
htra
New
Major
337.81
689 40th 17.8.1988 Modernisation of UKni Sujhat Major 60.13
690 40th 17.8.1988 Bihar Major 110.76
691 40th 17.8.1988 Drainage Scheme in the Irrigation
Commenda of Gendek and Koel Project
in North Bihar
Bihar Major 42.3906
692 40th 17.8.1988 Dudhgange Project Maharas
htra
Major 204.5837
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n693 40
th 17.8.1988 Indira Gandhi Feeder Gang Canal link
Chennal
Rajastha
n
Major 17.64
694 40th 17.8.1988 Rena Pur Maharas
htra
New
Medium
7.3606
695 40th 17.8.1988 Kundghat Reservior Project Bihar Medium 5.6004
696 40th 17.8.1988 Champamati Assam Revised
Major
47.4902
697 40th 17.8.1988 Sardar sarovar Project Gujarat Major 6406.04
698 40th 17.8.1988 Sriram Sagar Stage-I Andhra
Pradesh
Major 9.0027
699 40th 17.8.1988 SYL Canal Project Part-I Punjab Major 429.77
700 40th 17.8.1988 Cheyyeru Irrigation Project Andhra
Pradesh
Revised
Medium
28.07287
701 40th 17.8.1988 Protection of Balasbari and Guni area
from eraision of river Brahmaputra.
Assam F.C. 15.3
702 41st
Meeti
ng
25.10.1988 Vamsadhora Project Stege II Andhra
Pradesh
New
Major/Mul
ti Purfose
275.74
703 41st 25.10.1988 Pench Diverion Project Madhya
Pradesh
184.04
704 41st 25.10.1988 Onkorashwar Multi Purpose Project Madhya
Pradesh
788.03
705 41st 25.10.1988 Bhotoa Irrigation Project Maharas
htra
164.11
706 41st 25.10.1988 Modernisation of Dartiwada Resevoir Gujarat 34.8801
707 41st 25.10.1988 Modernisation of fakwedi Canal System Gujarat 24.7653
708 41st 25.10.1988 SYL Canal Part-III Punjab 48.12
709 41st 25.10.1988 Singur Project Andhra
Pradesh
104.36
710 41st 25.10.1988 Deo Irrigation Project Orissa 40.76
711 41st 25.10.1988 Rukura Irrigation Project Orissa 15.17
712 41st 25.10.1988 Iayakwadi Stage-I Maharas
htra
Revised
Major/Mul
ti Purpose
185.43
713 41st 25.10.1988 Tehrio Dam Project Uttar
Pradesh
131350
714 41st 25.10.1988 Westrn Kosi Canal (India Partion) Bihar 326.6124
715 41st 25.10.1988 Panchkhero Reservoir Project Bihar Revised
Medium
9.549
716 42nd
Meeti
ng
11.1.1989 Modernisation of Shotrining Irrigation
Scheme
Gujarat New
Major/Mul
ti Purpose
8.1
717 42nd 11.1.1989 Modernisation of Kharicut Canal System Gujarat 18.6
718 42nd 11.1.1989 Mahenadi Chibrot-Pale Island Irrigation
Project
Orissa 30.9337
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n719 42
nd 11.1.1989 Wan River Project Maharas
htra
46.85
720 42nd 11.1.1989 Kayna Krishna Lift Irrigation Scheme Maharas
htra
259.107
721 42nd 11.1.1989 Kurli Project Maharas
htra
2700
722 42nd 11.1.1989 Bargi Multi Purpose Project Madhya
Pradesh
566.34
723 42nd 11.1.1989 N Sager Project Madhya
Pradesh
1966.67
724 42nd 11.1.1989 Sub surface drainage in south Western
Distncts
Punjab k 10.01
725 42nd 11.1.1989 Bhairwar Reservoir Scheme Bihar 20.1885
726 42nd 11.1.1989 Bardikari Irrihgation Project Assam Revised
Major/
Multi
Prupose
22.1297
727 42nd 11.1.1989 Patter Irrigation Project Orissa 83.7
728 42nd 11.1.1989 Upper Krishna Project Stage-I Karnatak
a
1214.91
729 42nd 11.1.1989 Kansjore Reservoir Scheme Bihar Revised
Medium
20.908
730 43rd
Meeti
ng
18.5.1989 Arancvati River Project Maharas
htra
New
Major/
Multi
Purpose
66.48
731 43rd 18.5.1989 Bawanthadi Project Maharas
htra
161.575
732 43rd 18.5.1989 Sangola Brench Canal Maharas
htra
37.01
733 43rd 18.5.1989 Punjab Irrigation Project Phase-II lining
of Water Curese
Punjab 119.97
734 43rd 18.5.1989 Modermsatier of Couery Delte Phese-I Tamil
Nadu
78.8
735 43rd 18.5.1989 Tanrani Multi Purpose Dam Project Uttar
Pradesh
Revised
Major/
Multi
Purpose
144.84
736 43rd 18.5.1989 Sitapur Town Flood Protechen Scheme Uttar
Pradesh
F.C. 6.01
737 44th 22.9.1989 Rehabilitation and Irrigation of Canal
regulation structures in the Canal
system of Punjab,
Punjab New
Major/
Multi
Purpose
34.49
738 44th 22.9.1989 Lower Wunne Project Maharas
htra
87.55
739 44th 22.9.1989 Punad Irrigetion Project Maharas
htra
29.92
740 44th 22.9.1989 Sidhmukh Irrigation Project Rajastha
n
Major 103 86.209 09.07.1990
741 44th 22.9.1989 Nohor Irrigation Project Rajastha
n
Major 40.59 13.665 09.07.1990
742 44th 22.9.1989 Bargi Multi Purpose Project Madhya
Pradesh
566.34
743 44th 22.9.1989 Chunoni Irrigation Project Kerala 36.15
744 44th 22.9.1989 North Koel Reservoir Project Bihar Major 439 CCA-
124.27(Bihar
111.80 &
Jharkhand-
12.47)745 44
th 22.9.1989 Rangai Valley Irrigation Project Meghala
ya
New
Medium
16.3
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n746 44
th 22.9.1989 Punjab Irrigation Project Phase-II Lining
of Channels
Punjab 82.79
747 44th 22.9.1989 Extension & Impoovemant of Irrigation
of shah Nahar Canal
Punjab 95.25
748 44th 22.9.1989 Flood Prevention Works at Allahabad
Phase II-
Uttar
Pradesh
F.C. 6
749 45th Suhapat Irrigation Project Madhya
Pradesh
New
Medium
15.6
750 45th Kesha Reservoir Scheme Bihar 16.14
751 45th Rajiabad high lift Irrigation Scheme Jammu
&
10.6067
752 45th Dolaithabi Barrage Project Manipur 19.2
753 45th Jakham Irrigation Project Rajastha
n
Revised
Major/
Multi
Purpose
65.46
754 46th 21.12.1989 Tillari Irrigation Project Maharas
htra &
Major
(New)
217.22
755 46th 21.12.1989 MODERNISATION OF ZAINGIR Jammu
&
Medium 6.425
756 46th 21.12.1899 Moderamsation of Periyar-Valgal
Irrigation System Stage I & II ( REVD)
Tamil
Nadu
Major/Mul
ti
Purpose
99.72
757 47th 30.1.1990 Bewar Feeder Project (New) Uttar
Pradesh
Major/
Multi
Purpose
25.37
758 47th 30.1.1990 Modernisation of Zaingir Canal Project
(New)
Jammu
&
Medium 6.425
759 47th 30.1.1990 Salauli Irrigation Project (REVD) GOA Major 88.3
760 47th 30.1.1990 Warang Drainage Development Scheme Assam F.C. 4.9
761 48th 5.7.1990 Bansagar Canal Project (New) Uttar
Pradesh
Major/Mul
ti Purpose
190.27
762 48th 5.7.1990 Pagadiya Dam Project (New) Assam 287.86
763 49th 11.9.1990 Modernisation of Upper Ganga Canal
PH. I y Madya Ganga Canal (375 + 345
= 720)
Uttar
Pradesh
Major/
Multi
Purpose
720 (375-
Upper Ganga
x345 Madya
Ganga
764 49th 11.9.1990 Modernisation of Periyar Vahgni
Irrigation System Stage I x II
Tamil
Nadu
Major 124.72
765 49th 11.9.19990 Kartan Reservoir Project Gujarat Major 186.37
766 49th 11.9.1990 Dhulbaha Dam Project (REVD) Punjab Medium 21.13
767 49th 11.9.1990 Construction of Priority Works under
ghaggar flood control scheme
Rajastha
n
Flood
control
7.05
768 49th 11.9.1990 Beel balli drainage scheme West
Bengal
flood 2.148
769 49th 11.9.1990 Harang drainage development scheme Assam Flood 4.9
770 50th 20.3.1991 Hathnikund Barrage Project Haryana Major 72.89
771 50th 20.3.1991 Watrak Irrigation Project Gujarat Major 43.705
771.7 50th 20.3.1991 Thanwar Irrigation Project Madhya
Pradesh
Major 24.384
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n773 50
th 20.3.1991 Gyanpur pump canal Uttar
Pradesh
Major 110.51
773.6 50th 20.3.1991 Walan Medium Irrigation Scheme
(New)
Gujarat Medium 22.156
774.9 50th 20.3.1991 Uben Medum Irrigation Project Gujarat Medium 12.485
775.6 50th 20.3.1991 DEA Irrigation Project Orissa Medium 52.227
776.9 50th 20.3.1991 Modernistaion of Periyar-Vaigai
Irrigation system (Revd)
Tamil
Nadu
Major 124.72
778 50th 20.3.1991 Sutlej Yamuna Link Canal – Part I
(Revd)
Punjab Major 499.12
779 50th 20.3.1991 Macahu II Medium Irrigation Project
(Recd)
Gujarat Medium 37.76
780 50th 20.3.1991 Meja Modernisation and Meja Feeder
Project (Revd)
Rajastha
n
Medium 37.62
781 51st 4.12.1991 Protection of Mukalmna (Howlighat) and
its Adjoining Area From Erosion of
River Brahmaputra
Flood
Control
14.33
782 51st 4.12.1991 Anti- Erostion scheme for Protection of
Nagaghdoli Maijam area upstream of
Dibrugarh Rown Along River
Brahmapotra
Assam Flood
Control
10.74
783 51st 4.12.1991 PATHRAI Dam Project (New) Uttar
Pradesh
Medium 12.54
784 51st 4.12.1991 Deo Irrigation Project (New) Orissa Medium 52.227
785 51st 4.12.1991 Narmada Canal Project (New) Rajastha
n
Major 467.53
786 51st 4.12.1991 Jaismand Modernisation Project (New) Rajastha
n
Major 12.4
787 51st 4.12.1991 Modernisation of upper Ganga Canal PH-
I (New)
Uttar
Pradesh
Major 467.76
788 51st 4.12.1991 Vamsadhara Stage-II Project (New) Andhra
Pradesh
Major 275.74
789 51st 4.12.1991 Increasing Capacity of Deokali Pump
Canal (Recd)
Uttar
Pradesh
Major 35.24
790 51st 4.12.1991 Increasing Capacity of Narayanpur
Pump Canal (Revd)
Uttar
Pradesh
Major 52.02
791 51st 4.12.1991 Borolia Irrigation Scheme (Revd). Assam Medium 33.37
792 51st 4.12.1991 Balh Valley Irrigation Project (Revd). Himacha
l
Medium 8.22
793 52nd 28.4.1992 Kolar Project (New) Madhya
Pradesh
Major 139.14 60868
794 52nd 28.4.1992 Increasing Capacity of Zamania Pump
Canal (New)
Uttar
Pradesh
Major 39.812 50400 (31821
Additional)
795 52nd 28.4.1992 Bewar Feeder Project (New) Uttar
Pradesh
Major 27.97 63656 (9800
Additional )
796 52nd 28.4.1992 Karanja Irrigation Project (New) Karnatak
a
Major 98 48968
797 52nd 28.4.1992 Chauli Irrigation Project (New) Rajastha
n
Medium 28.87 8963
19.37 618652nd 28.4.1992 Mukteshwar Irrigation Project (New) MediumGujarat 798
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n799 52
nd 28.4.1992 RAVI Project Unit – I (Revd) Punjab Major 1652.08 348000
800 52nd 28.4.1992 Singda Dam Multi Purpose Project
(Revd)
Manipur Medium 34.3 4148
801 52nd 28.4.1992 Khuga Irrigation Project (Revd) Manipur Medium 67.7 14,755
802 53rd 08.12.1992 Kaulasnala Irrigation Project (Sanjay) Andhra
Pradesh
Medium 20.49 4,131 26.02.1993
803 53rd 08.12.1992 Maddileru Irrigation Project Andhra
Pradesh
Medium 28.56 5,213 26.02.1993
804 53rd 08.12.1992 Yerrakalava Irrigation Project Andhra
Pradesh
Medium 46.52 9,996 26.02.1993
805 53rd 08.12.1992 Subernarekha Multipurpose Project Bihar Major 1,428.82 2,36,846
806 53rd 08.12.1992 Bennithora Irrigation Project Karnatak
a
Major 73.25 21,854 23.02.1993
807 53rd 08.12.1992 Bargi Diversion Project Madhya
Pradesh
Major 1,101.23 3,76,514 06.07.1998
808 53rd 08.12.1992 Sindh River Project Phase-II Madhya
Pradesh
Major 510.94 1,62,100 17.03.1998
809 53rd 08.12.1992 Bethali Irrigation Project Rajastha
n
Medium 13.07 4,316 26.10.1998
810 53rd 08.12.1992 Gunta Dam Irrigation Project Uttar
Pradesh
Medium 18.41 3,878 18.06.1997
811 54th 26.03.1993 Yeleru Reservoir Project Andhra
Pradesh
Major 335.34 27,360
812 54th 26.03.1993 Buggavanka Irrigation Project Andhra
Pradesh
Medium 25.96 5,200 29.07.1993
813 54th 26.03.1993 Sanjay Sagar Irrigation Project Madhya
Pradesh
Medium 39.13 8,052
814 54th 26.03.1993 Kanupur Irrigation Project Orissa Major 268.65 47,709
815 54th 26.03.1993 Naraj Barrage Project Orissa Major 125.74 2,93,318 06.08.1993
816 54th 26.03.1993 Manjore Irrigation Project Orissa Medium 37.7 10,433
817 54th 26.03.1993 Titilagarh Irrigation Project Orissa Medium 21.13 2,950 21.10.1993
818 54th 26.03.1993 Bisalpur Drinking Water and Irr. Project Rajastha
n
Major 309.07 49,890 16.12.1997
819 54th 26.03.1993 Somkagdar Irrigation Project (Revised) Rajastha
n
Medium 22.3 5,739 27.09.1993
820 54th 26.03.1993 Raising Meza Dam Uttar
Pradesh
Major 52.18 17,879
821 55th 27.08.1993 Chelamelavagu Irrigation Project Andhra
Pradesh
Medium 22.99 2,632 02.05.1994
822 55th 27.08.1993 Auranga Reservoir Project (Revised) Bihar Major 297.81 55,420
6,661 (Org.)
2,138 (Add.)
824 55th 27.08.1993 Providing Hydroplus Fusegate on
Wanakbori Weir
Gujarat Major 8.58 2,62,694 07.02.1994
825 55th 27.08.1993 Rajghat Canal Project Madhya
Pradesh
Major 309.21 1,21,450
826 55th 27.08.1993 Sako Irrigation Project Maharas
htra
Medium 10.88 2,064
55th 27.08.1993 Mod. of Machhu-I Irrigation Scheme Gujarat Major 8.12823
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n827 55
th 27.08.1993 Subernarekha Irrigation Project Orissa Major 790.32 1,87,462 28.12.1995
828 55th 27.08.1993 Rukura Irrigation Project Orissa Medium 25.22 7,648 01.06.2009
829 55th 27.08.1993 Manu Irrigation Project (Revised) Tripura Medium 33.28 7,560
830 55th 27.08.1993 Urmil Dam Project Uttar
Pradesh
Medium 29.45 4,769
831 55th 27.08.1993 Mod. of Kangsabati Reservoir West
Bengal
Major 329.07 3,02,925
832 56th 10.11.1993 Birupa Genguti Island Irrigation Scheme
(Revised)
Andhra
Pradesh
Medium 11.46 8,086
833 56th 10.11.1993 Palemvage Irrigation Project Andhra
Pradesh
Medium 29.13 6,230 17.03.2006
834 56th 10.11.1993 Pedderu Reservoir Project Andhra
Pradesh
Medium 26.23 6,460
835 56th 10.11.1993 Dhansiri Irrigation Project (Revised) Assam Major 158.32 83,366
836 56th 10.11.1993 Mod. of Sone Canal Bihar Major 235.93 48,600 07.07.1998
837 56th 10.11.1993 Omkareshwar Multipurpose Project Madhya
Pradesh
Major 1,784.29 2,83,320 15.05.2001
838 56th 10.11.1993 Chandraprabha Irrigation Project Maharas
htra
Medium 35.3 8,135
839 56th 10.11.1993 Masalaaga Irrigation Project Maharas
htra
Medium 10.51 2,080
840 56th 10.11.1993 Pentakli Tank Project Maharas
htra
Medium 31.41 9,505
841 56th 10.11.1993 Upper Colab Irr. Project (Revised) Orissa Major 204.78 8,750
842 56th 10.11.1993 Eastern Ganga Canal (Revised) Uttar
Pradesh
Major 258.48 1,05,000
843 56th 10.11.1993 Madhya Ganga Canal Uttar
Pradesh
Major 448.19 1,78,000
844 56th 10.11.1993 Rajghat Canal Project Uttar
Pradesh
Major 126.43 1,38,660 23.03.2001
845 57th 27.01.1994 Sutlej Yamuna Link Canal Haryana Major 61.76 4,46,000
846 57th 27.01.1994 Bansagar Canal Project Madhya
Pradesh
Major 344.66 2,49,359 29.11.2001
847 57th 27.01.1994 Benetura Irrigation Project Maharas
htra
Medium 12.12 2,548 25.02.1997
848 57th 27.01.1994 Raigavan Irrigation Project Maharas
htra
Medium 9.51 1,700
849 57th 27.01.1994 Bansagar Canal Project Uttar
Pradesh
Major 190.27 1,50,132
850 57th 27.01.1994 Western Gandak Canal (Revised) Uttar
Pradesh
Major 154.38 3,32,000
851 57th 27.01.1994 Providing Kharif Channel in Hindon
Krishni Doab
Uttar
Pradesh
Medium 15.53 3,000 06.07.1995
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n852 58
th 24.06.1994 Srisailam Right branch Canal Project
(Revised)
Andhra
Pradesh
Major 1,185.58 1,00,870
853 58th 24.06.1994 Idamalayar Irrigation Project Kerala Major 107 27,513
854 58th 24.06.1994 Tembhapuri Project Maharas
htra
Medium 18.09 4,784 13.07.1995
855 58th 24.06.1994 Sapua Badajore (Revised) Orissa Medium 33.21 3,752
856 58th 24.06.1994 Satlej Yamuna Link Canal Punjab Major 601.25
857 58th 24.06.1994 Lining of Channels in Bundelkhand and
Baghelkhand Regions
Uttar
Pradesh
Major 57.37 23,778
858 59th 16.12.1994 Haryana Water Resources Consolidation
Project
Haryana Major 1,442.12 1,3,000 (Add.) 22.12.1995
859 59th 16.12.1994 Bordahegaon Irrigation Project Maharas
htra
Medium 16.27 2,218 10.11.1997
860 60th 18.05.1995 Sriram Sagar Project- Stage-I (Rev. Andhra
Pradesh
Major 1,519.15 59,59,000
861 60th 18.05.1995 Tamil Nadu WRC Project Tamil
Nadu
Major 807.49 19.05.1995
862 61st 22.05.1995 Integrated Kallong Irrigation Scheme
(Rev.)
Assam Major 80.55 34,400
863 62nd 25.08.1995 Pagladiya Dam Project (Multipurpose) Assam Major 542.9 54,290/3MW 03.01.2001
864 62nd 25.08.1995 Tipaimukh Dam Project (Multipurpose) Manipur/
Mizoram
Major 2,899.00 -/1,500 MW
865 62nd 25.08.1995 Orissa Water Resources Consolidation
Project
Orissa Major 977 27.09.1995
866 62nd 25.08.1995 Chakan Irrigation Project Rajastha
n
Medium 9.55 3,377
867 63rd 25.01.1996 Flood Protection of Barauni-Begusarai
Complex
Bihar Major 6.2396 -
868 64th 03.04.1996 Bhima Lift Irrigation Andhra
Pradesh
Major 744 83,779 18.12.2007
869 64th 03.04.1996 Flood Clow Canal project from SRSP
(High Level Canal Project)
Andhra
Pradesh
Major 1,331.30 1,02,000 08.12.2005
870 64th 03.04.1996 Krishna Delta Modernisation including
Pulichintala Dam Project
Andhra
Pradesh
Major 1,165.36 5,75,000
871 64th 03.04.1996 Sriram Sagar Project Stage-II Andhra
Pradesh
Major 697.7 2,53,400
872 64th 03.04.1996 Shah Nahar Irrigation Project Himacha
l
Pradesh
Major 143.32 24,760 21.02.1997
873 64th 03.04.1996 Gararda Irrigation Project Rajastha
n
Medium 39.51 9,215
874 65th 14.06.1996 K.C.Canal Mod. Project Andhra
Pradesh
Major 674.29 1,10,482 16.4.1998
875 65th 14.06.1996 Regali Irrigation Sub Project LBC-II Orissa Major 705.15 1,77,651 14.07.1997
876 65th 14.06.1996 Indira Gandhi Nahar Project Stage-I Rajastha
n
Major 121.92 5,57,600
877 65th 14.06.1996 Indira Gandhi Nahar Project Stage-II Rajastha
n
Major 1,398.91 8,59,115 11.03.1998
878 65th 14.06.1996 Pathrai Irrigation Project (Revised) Uttar
Pradesh
Medium 31.66 2,998
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n879 66
th 04.02.1997 Mod. of Jamuna Irrigation project Assam Major 60.27 28,286 17.12.1997
880 66th 04.02.1997 Goma Irrigation Project Gujarat Medium 47.59 7,039 30.12.1997
881 66th 04.02.1997 Upper Beda Irrigation Project Madhya
Pradesh
Medium 89.52 13,365 10.09.1998
882 66th 04.02.1997 Lower Indra Irrigation Orissa Major 211.7 38,870 04.02.1999
883 66th 04.02.1997 Lower Suktel Irrigation Project Orissa Major 217.13 29,845 25.06.1999
884 66th 04.02.1997 Subernarekha Irrigation Project
(Revised)
Orissa Major 1,013.68 187462
885 66th 04.02.1997 Bandisendra Irrigation Project Rajastha
n
Medium 13.04 4,091 10.12.1997
886 66th 04.02.1997 Sukli Irrigation Project Rajastha
n
Medium 18.698 3,889 10.12.1997
887 66th 04.02.1997 Chittaurgarh Reservoir Project Uttar
Pradesh
Major 34.06 16,098
888 67th 09.09.1997 Buridehang Lift Irrigation Scheme Assam Medium 17.27 5,054
889 67th 09.09.1997 Hawaipur Lift Irrigation Scheme Assam Medium 14.93 3,887
890 67th 09.09.1997 Bhabour Sahib Lift Irrigation Project
Phase-II (Revised)
Himacha
l
Pradesh
Medium 11.42 3,432
891 67th 09.09.1997 Sidhatha Irrigation Project Himacha
l
Pradesh
Medium 33.62 3,150 02.02.2000
892 67th 09.09.1997 Mod. of Ranbir Canal Jammu
&
Major 84.4 49,418 21.05.1998
893 67th 09.09.1997 Thoubhal Irrigation Project (Revised) Manipur Major 254 33,400
894 67th 09.09.1997 Jarauli Pump Canal Project Uttar
Pradesh
Major 47.92 39,748 (Addl.) 23.03.1998
895 67th 09.09.1997 Maudaha Dam Project Uttar
Pradesh
Major 117.23 28,234
896 68th 12.06.1998 Chagalnadu Lift Irrigation Project Andhra
Pradesh
Major 43.05 14,165 19.02.2001
897 68th 12.06.1998 Burisuti Irrigation Project Assam Medium 34.7 11,500
898 68th 12.06.1998 Talamba Irrigation Project Maharas
htra
Major 289.09 28,900
899 68th 12.06.1998 Kar Medium Project Maharas
htra
Medium 44.71 6,359
900 68th 12.06.1998 Rengali Irrigation Sub-Project RBC (0-
112) (Revised)
Orissa Major 738.27 1,70,850 17.11.1998
901 68th 12.06.1998 Dhauragoth Irrigation Project Orissa Medium 16.8 3,010
902 68th 12.06.1998 Providing Kharif Channel in Hindon
Krishni Doab (Revised)
Uttar
Pradesh
Major 39.24 11,600 07.12.2000
903 69th 06.10.1998 Priyadarshini Jurala Project Andhra
Pradesh
Major 545.82 47.835
904 69th 06.10.1998 Balh Valley Irrigation Project Himacha
l
Pradesh
Medium 12.02 3,037 -
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n905 69
th 06.10.1998 Dzuza Medium Irrigation Project Nagalan
d
Medium 75.2 11,500 10.07.2009
906 70th 27.01.1999 Gumani Barrage Project (Revised) Bihar Major 85.55 16,194
907 70th 27.01.1999 Punasi Reservoir Jharkhan
d
Major 221.65 24,292
908 70th 27.01.1999 Siktia (Ajoy) Barrage Project Jharkhan
d
Major 248.1 40,509
909 70th 27.01.1999 Lift Irrigation in Changer Area Himacha
l
Pradesh
Medium 28.37 3,041 29.02.2000
910 70th 27.01.1999 Jam Medium Project Maharas
htra
Medium 42.63 5,474
911 70th 27.01.1999 Upper Indravati Irr. (Extn.) Project Orissa Major 136.67 41,794 18.03.2003
912 71st 03.08.1999 Upper Kiul Reservoir Project (Revised) Bihar Major 106.53 19,000
913 71st 03.08.1999 Utwali Irrigation Project Maharas
htra
Medium 35.78 5,394 02.12.2004
914 71st 03.08.1999 Supplementary Note on Jiri Irr. Project Manipur Medium 48.68 9,775
915 71st 03.08.1999 Upper Kolab Irrigation Project –
Extension of Ayacut at 14.3 Km of
Jeypore Main Canal (Nawarangpur
Branch Canal)
Orissa Major 71.66 19,283
916 71st 03.08.1999 Ret Irrigation Project Orissa Medium 86.14 9,775 17.10.2003
917 71st 03.08.1999 Telengiri Irrigation Project Orissa Medium 106.18 13,829 25.02.2003
918 71st 03.08.1999 Kandi Canal Extension from Hoshiarpur
to Balchur
Punjab Major 147.12 23,326 05.04.2002
919 71st 03.08.1999 Food Protection/ Diversion Scheme of
Kota City – Phase-I
Rajastha
n
Major 19.75 -
920 71st 03.08.1999 Mod. Project of Ghaggar Flood Control Rajastha
n
Major 101.69 -
921 72nd 18.01.2000 Suram Palem Reservoir Scheme Andhra
Pradesh
Medium 46.7 6,205
922 72nd 18.01.2000 Yerravagu Irrigation Project Andhra
Pradesh
Medium 31.28 4,453
923 72nd 18.01.2000 Pagladiya Dam Project Assam Major 542.9 54,160/3MW 03.01.2001
924 72nd 18.01.2000 Bateshwarsthan Ganga Pump Canal
Scheme (Phase-I)
Bihar Major 212 27,603
925 72nd 18.01.2000 Durgawati Reservoir Project Bihar Major 234.41 36,421
926 72nd 18.01.2000 Western Kosi Canal Project- Revised Bihar Major 884.6 2.33 Lakh
927 72nd 18.01.2000 Renuka Dam Project Himacha
l
Pradesh
Major 1,224.64 Drinking Water
to Delhi=542.5
CM/40MW
928 72nd 18.01.2000 Swan River Reservoir Scheme (Flood
Protection Works)
Himacha
l
Pradesh
Major 102.72 N.A. 30.03.2001
929 72nd 18.01.2000 Remodelling of Channels of UBDC
System
Punjab Major 177.8 54,300 13.12.2000
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n930 72
nd 18.01.2000 Eastern Yamuna Link Channel Uttar
Pradesh
Major 22.44 Supplementati
on to the
existing
system EYC –
3,09,698 H.K.
Doab-31, 420
17.09.2001
931 72nd 18.01.2000 Saryu Nahar Pariyojana Uttar
Pradesh
Major 2,765.16 14.04 Lakh
932 73rd 31.06.2000 Vamsadhara Project Phase-I of Stage-II
(Right Main Canal)
Andhra
Pradesh
Major 123.936 25,203 02.01.2002
933 73rd 31.06.2000 Peddavagu Project (Komaram Bhim) Andhra
Pradesh
Medium 202.59 10,927 23.03.2007
934 73rd 31.06.2000 Sudhavagu Irrigation Project Andhra
Pradesh
Medium 56.48 5,666
935 73rd 31.06.2000 Tilaiya Dhadhar Diversion Project Bihar Major 220.11 31,700
936 73rd 31.06.2000 Upper Krishna Stage-II Multipurpose
Project (Irrigation Portion)
Karnatak
a
Major 2,358.86 227000 13.12.2000
937 73rd 31.06.2000 Kanupur Irrigation Project Orissa Major 428.32 47,709 16.09.2002
938 73rd 31.06.2000 Samakoi Barrage Irrigation Project Orissa Medium 43.85 10,906
939 73rd 31.06.2000 Upper Lanth Irrigation Project Orissa Medium 48.99 6105/210MW
940 73rd 31.06.2000 Mod. of Gang Canal Rajastha
n
Major 445.79 48,192 29.09.2000
941 74th 20.09.2000 Valligallu Reservoir Andhra
Pradesh
Medium 143.67 10525 Drinking
Water
Provision 2.23
MCM
22.12.2006
942 74th 20.09.2000 Western Yamuna Link Channel Haryana Major 33.98 Link Channel
943 74th 20.09.2000 Improvement to Salki Irrigation Project Orissa Major 11.57 20,141
944 74th 20.09.2000 Improvement to Sason Canal System Orissa Major 34.92 (28.96
for Irrigation)
26051 29.07.2002
945 74th 20.09.2000 Ong Dam Project Orissa Major 304.66 34,500
3,120
Drinking Water
Provision to –
Town-31.54
MCMRural-0.73
MCM55,224
Drinking Water
– 458.36 MCM
74th 13,665
Orissa 52.96 (28.96
for irrigation)
Medium
Rajastha
n
Major 49.38 (91.75
share cost of
Punjab&
Haryana)
20.09.2000
11.09.200320.09.2000 Chheligada Dam Project
Nohar Irrigation Project (Revised)
Rajastha
n
657.91
(385.60 for
Irrigation)
Major20.09.2000 Bisalpur Drinking Water-cum-Irrigation
Project (Revised)
948
74th
74th
946
947
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
nDrinking Water
Provision – 3
MCM
949 75th 18.12.2000 Bhupathipalem Reservoir Scheme Andhra
Pradesh
Medium 47.23 6516 23.03.2007
950 75th 18.12.2000 Surampalem Reservoir Scheme Phase-II Andhra
Pradesh
Medium 49.5 5520
951 75th 18.12.2000 Konar Bihar Major 336.69 64,738
952 75th 18.12.2000 Balh Valley (Lift Bank) Irrigation Project Himacha
l
Pradesh
Medium 41.64 4354 10.06.2005
953 75th 18.12.2000 Mod. of Kathua Canal Jammu
&
Medium 15.68 3304
954 75th 18.12.2000 Mod. of Zaingir Canal Jammu
&
Medium 13.66 2140 08.06.2001
1,42,083-UP
1,21,450-MP
956 75th 18.12.2000 Brutang Irrigation Project Orissa Major 227.25 30,290
957 75th 18.12.2000 Raising Lining of Bhakra Main Line Punjab Major 20.46 N.A.
958 75th 18.12.2000 Mod. of Agra Canal Uttar
Pradesh
Major 74.16 50,000 11.02.2003
959 76th 29.03.2001 Tri Muhani Kursela Embankment
Scheme (Flood Protection)
Bihar Major 19.74 6,636
960 76th 29.03.2001 Rafiabad High Lift Irrigation Scheme Jammu
&
Medium 35.6 2,932 27.09.2001
961 76th 29.03.2001 Anandpur Barrage Project Across River
Baitarani
Orissa Major 482.26 56,720 30.12.2004
962 76th 29.03.2001 Hadua Irrigation Project Orissa Medium 61.48 5,728
963 76th 29.03.2001 Rajasthan Water sector Restructuring
Project
Rajastha
n
Major 745.59 -
964 76th 29.03.2001 Jewar – Tappal Embankment Scheme
(Flood Protection)
Uttar
Pradesh
Major 27.15 7,619.65
965 76th 29.03.2001 Providing Kharif Channel in Hindon
Krishni Doab (Revised)
Uttar
Pradesh
Major 66.34 11,600
966 77th 03.08.2001 Pun-Pun Barrage Scheme Bihar Major 102.26 13,898 13.01.2006
967 77th 03.08.2001 Mod. of New Pratap Canal Jammu
&
Medium 21.68 12042
968 77th 03.08.2001 Ravi Project Unit-I (Ranjit Sagar {Thein}
Dam with Shahpurkandi Dam Project –
Upper Bari Doab Canal Hydel Project
Stage-III) [Revised Estimate] –
Multipurpose
Punjab Major 5,065.48 3,48,173/645
MW & 168 MW
05.11.2001
969 77th 03.08.2001 Lining of Channel - ERM Punjab Medium 49.02 8,330
970 77th 03.08.2001 Sidhmukh Irrigation Project (Revised) Rajastha
n
Major 220.86 43,214
Rajastha
n
Major 49.38 (91.75
share cost of
Punjab&
Haryana)
20.09.2000 Nohar Irrigation Project (Revised)
Madhya
Pradesh
Major 300.675th 18.12.2000 Rajghat Dam Project
948
955
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n971 77
th 03.08.2001 Extn. of Gomtinagar Protection Bundha
upto 4.8 km. downstream of Northern
Railway Line (Flood Protection)
Uttar
Pradesh
Flood
Control
9.96 -
972 77th 03.08.2001 Protection to the Right Bank of River
Ganga/Padma from downstream of
Farakka Barrage to Jalangi, District
Murshidabad – Flood Protection
West
Bengal
Flood
Control
29.4072 -
973 78th 24.09.2001 Uttar Pradesh Water Sector
Restructuring Project – Phase-I-ERM
Uttar
Pradesh
Major 663.41
(Provisional)
3,00,000
974 79th 24.05.2002 Avulsion of Brahmaputra at Dholla
Hatighuli
Assam Flood
Control
13.71 -
975 79th 24.05.2002 Harang Sub-Basin Drainage
Development Scheme (Revised)
Assam Flood
Control
30.49 -
976 79th 24.05.2002 Markandeya Reservoir Project Karnatak
a
Major 209.85 19105
977 79th 24.05.2002 Lal Nalla Irrigation Project Maharas
htra
Medium 43.61 7020
978 79th 24.05.2002 Purna River Project Maharas
htra
Medium 123.79 7530 23.05.2003
979 79th 24.05.2002 Tajnapur Lift Irrigation Project Phase-I Maharas
htra
Medium 23.46 3622 29.07.2002
980 79th 24.05.2002 Mahendratanaya Irrigation Project Orissa Medium 100.98 9504
981 79th 24.05.2002 Salandi Sanskar Project Orissa Medium 99.14 7111 08.10.2003
982 79th 24.05.2002 Mahi Bajaj Sagar Project, Unit-II: Canal
(Revised)
Rajastha
n
Major 538.58 71,200
983 79th 24.05.2002 Bhupali Pump Canal Uttar
Pradesh
Major 60.53 34,605
984 79th 24.05.2002 Providing Link Channel for Eastern
Yamuna Canal, i.e. Hathnikund Link
Channel (Revised)
Uttar
Pradesh
Major 36.43 -
985 79th 24.05.2002 Pathrai Dam Project (Revised) Uttar
Pradesh
Medium 44.22 2998
986 80th 07.02.2003 Sone Modernization Scheme (Revised) Bihar Major 493.17 900000
987 80th 07.02.2003 Mahanadi Reservoir Project Chattisg
arh
Major 566.88 264000 01.07.2003
988 80th 07.02.2003 Sutiapat Irrigation Project Chattisg
arh
Medium 46.9474 6,960 09.04.2007
989 80th 07.02.2003 Modernization of Dadi Canal Jammu
&
Medium 11.1 4,526 14.09.2004
990 80th 07.02.2003 Upper Tunga Project Karnatak
a
Major 1052.33 80,494
991 80th 07.02.2003 Mahan Irrigation Project (Gulab Sagar
Project)
Madhya
Pradesh
Major 140.51 19,740 24.09.2003
992 80th 07.02.2003 Wakod Irrigation Project Maharas
htra
Medium 34.36 2,217
993 80th 07.02.2003 Ib Irrigation Project Orissa Major 1140 1,06,279
994 80th 07.02.2003 Utilisation of Yamuna Water in
Bharatpur District of Rajasthan
Rajastha
n
Major 175.44 76,681
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n995 80
th 07.02.2003 Utilization of Yamuna Water in
Jhunjhunu & Churu District
Rajastha
n
Major 934.7 1,76,274
996 80th 07.02.2003 Irrukkangudi Reservoir Tamil
Nadu
Major 72 4,229
997 80th 07.02.2003 Bansagar Canal Project Uttar
Pradesh
Major 620.82 1,50,132 29.07.2004
998 80th 07.02.2003 Construction of Marginal Embankment
on Right Bank of River Ghaghra and
Left Bank of River Sarda
Uttar
Pradesh
Major 18.82 -
999 80th 07.02.2003 Improving Water Management on
Existing Sarda Canal System
Uttar
Pradesh
Major 102.41 8,06,300
1001 81st 04.08.2003 Thotapalli Barrage Scheme Andhra
Pradesh
Major 415.87 78443 20.03.2006
1002 81st 04.08.2003 Peddagedda Reservoir Project Andhra
Pradesh
Medium 32.117 4,858
1003 81st 04.08.2003 Mongra Irrigation Project Chattisg
arh
Medium 83.64 9,431 07.01.2005
1004 81st 04.08.2003 Tarali Irrigation Project Maharas
htra
Major 504.96 19,498 23.03.2007
1005 81st 04.08.2003 Kirmiri Darur Lift Irrigation Scheme Maharas
htra
Medium 27.89 2,443 13.10.2003
1006 81st 04.08.2003 Sonapur Tomta Lift Irrigation Scheme Maharas
htra
Medium 32.18 2,441 13.10.2003
1007 81st 04.08.2003 Chilhewadi Irrigation Project Maharas
htra
Medium 146.24 7,138
1008 81st 04.08.2003 Project Estimate for Construction of
Amwa Khas Retire Ring Bund from Km.
0.10 to 1.10
Uttar
Pradesh
Flood
Control
10.368 -
1009 82nd 19.02.2004 Pathrai Dam Project (Revised) Uttar
Pradesh
Medium 53.53 2,998
1010 82nd 19.02.2004 Providing Kharif Channels in Hindon-
Krishni Doab (Revised)
Uttar
Pradesh
Major 92.52 11,600
1011 82nd 19.02.2004 Minimata (Hasdeo) Bango Multipurpose
Project (Revised)
Chattisg
arh
Major 1312.32 4,33,500/120 20.05.2005
1012 82nd 19.02.2004 Mokama Tal Drainage, Raising and
Strengathening of Jamindari Bandh (74
Nos.)
Bihar Flood
Control
28.1668 -
1013 82nd 19.02.2004 Restoration Works of Eastern Gandak
Canal (ERM)
Bihar Major 294 6,62,000 31.03.2004
1014 82nd 19.02.2004 Pothra Nalla Medium Irrigation Project Maharas
htra
Medium 63.08 9,380 02.12.2004
1015 82nd 19.02.2004 Dhom Balakwadi Tunnel Irrigation
Project
Maharas
htra
Major 475.29 12,670 23.03.2007
1016 83rd 18.06.2004 Protection work on the Left Bank of
river Ganga u/s of Farakka Barrage
from Spur No-17 in Village
Panchanandpur , P.S. Kaliachak, district
Malda of West Bengal
West
Bengal
Flood
Control
24.05 -
02.05.2005Uttar
Pradesh
Major 88.3 46,485Modernisation of Lahchura Dam
(Revised)80
th 07.02.20031000
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1017 84
th 12.05.2005 Swan River Flood Management &
Integrated Land Development Project
Phase-II (
Himacha
l
Pradesh
New-
Flood
Control
235.52 -
1018 84th 12.05.2005 Punasa Lift Irrigation Madhya
Pradesh
Major 185.03 36758.4 04.02.2008
1019 84th 12.05.2005 Punad Irrigation Project Maharas
htra
Major 157.78 10846 05.12.2005
1020 84th 12.05.2005 Gul River Maharas
htra
Medium 65.73 3025 09.11.2005
1021 84th 12.05.2005 Haranghat Lift Irrigation Scheme Maharas
htra
Medium 49.2 4819 16.03.2006
1022 85th 22.02.2006 Modernization of Mav Khul Canal Jammu
&
Medium 12.8241 9352 .06.07.2006
1023 85th 22.02.2006 Modernization of Nandi Canal Jammu
&
Medium 6.4615 3060 06.07.2006
1024 85th 22.02.2006 Modernization of Martand i Canal Jammu
&
Medium 27.71 6498 06.07.2006
1025 85th 22.02.2006 Sri Ram Sagar Project Stage-II Andhra
Pradesh
Major 1043.14 193871 20.03.2006
1026 85th 22.02.2006 Pench Diversion Project Madhya
Pradesh
Major 583.4 96519 10.04.2006
1027 85th 22.02.2006 Dhansiri (Revised) Assam Major 401.24 83366 08.08.2007
1028 85th 22.02.2006 Champawati(Revised) Assam Major 147.24 24994 08.08.2007
1029 85th 22.02.2006 Canalizing of Sakki-Kiran Nallah Punjab Flood
Control
118.05 - 28.05.2008
1030 86th 02.06.2006 Moderniation of Babu Canal Jammu
&
Medium 12.3362 3077 06.07.2006
1031 86th 02.06.2006 Master Plan of Chenab River Jammu
&
Kashmir
Flood
Protection
25.45 -
1032 86th 02.06.2006 Master Plan of Tawi River Jammu
&
Kashmir
Flood
Protection
22.82 -- 15.02.2008
1033 86th 02.06.2006 Construction of Jewar-Tappal Marginal
bund
Uttar
Pradesh
Flood
Protection
71.3711 -
1034 86th 02.06.2006 Takli Irrigation Cum Drinking Water
Project
Rajastha
n
Medium 51.81 4791
1035 86th 02.06.2006 Narmada Canal Project Rajastha
n
Major 1541.357 151072 08.08.2007
1036 86th 02.06.2006 Pedavagu diversion scheme Andhra
Pradesh
Medium 124.64 6000 27.06.2006
1037 86th 02.06.2006 Rallivagu Reservoir Project Andhra
Pradesh
Medium 33.3 2430 27.06.2006
1038 86th 02.06.2006 Mathadivagu Reservoir Project Andhra
Pradesh
Medium 50.4 3440 27.06.2006
1039 86th 02.06.2006 Gagrin Irrigation Project Rajastha
n
Medium 80.12 9675
1040 86th 02.06.2006 Modernization of Ahji Canal Jammu
&
Medium 20.5149 8315.9 19-02-2008
1041 86th 02.06.2006 Golavagu Reservoir Project Andhra
Pradesh
Medium 84.08 3845 27.06.2006
1042 86th 02.06.2006 Manjore Irrigation Project Orissa Medium 99.53 10433 01.12.2007
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1043 86
th 02.06.2006 Piplad Irrigation Project Rajastha
n
Medium 33.64 3549
1044 86th 02.06.2006 Modernization of Dadi Canal Jammu
&
Medium 49.95 4650.13 06.07.2006
1045 86th 02.06.2006 Rafiabad high Lift Irrigation Scheme Jammu
&
Medium 63.62 2932 28.02.2008
1046 86th 02.06.2006 Pushkara Lift Irrigation Scheme Andhra
Pradesh
Major 379.503 75235 27.06.2006
1047 86th 02.06.2006 Tadipudi Lift Irrigation Scheme Andhra
Pradesh
Major 376.96 83599 27.06.2006
1048 87th 17.11.2006 Kachnoda Dam Project Uttar
Pradesh
Major 88.79 10850 03.01.2007
1049 87th 17.11.2006 1
st Patiala Feeder & Kotla Branch Punjab Major 123.3 68624 30.03.2007
1050 87th 17.11.2006 Nilwai Reservoir Project Andhra
Pradesh
Medium 90.5 5260 12.02.2007
1051 87th 17.11.2006 Kandi Canal Project Jammu
&
Medium 53.7 3229 30.03.2007
1052 87th 17.11.2006 Balh Valliey (Left Bank) Himacha
l
Medium 62.25 4354
1053 87th 17.11.2006 Widening, strengthing and providing
10m wide road way on Alipur Bund on
left Bank of river Yamuna
Uttar
Pradesh
Flood
Protection
42.2 - 22.12.2006
1054 87th 17.11.2006 Improving Irrigation intensity of Hardoi
Branch system
Uttar
Pradesh
Major 105.2997 306055 08.12.2006
1055 88th 02.03.2007 Alisagar Lift Irrigation Scheme. Andhra
Pradesh
Major 227.9 21770 23.03.2007
1056 88th 02.03.2007 Gutpha Lift Irrigation Scheme Andhra
Pradesh
Major 171.91 15699 23.03.2007
1057 88th 02.03.2007 Godavari Lift Irrigation Andhra
Pradesh
Major 6016 286000 23.03.2007
1058 88th 02.03.2007 Bembla River Project Maharas
htra
Major 1276.87 70756 -
1059 88th 02.03.2007 Khadakpurna River Project Maharas
htra
Major 578.56 24864 23.03.2007
1060 88th 02.03.2007 Arunavati River Project Maharas
htra
Major 224.16 25155 23.03.2007
1061 88th 02.03.2007 Lal Nalla Irrigation Project Maharas
htra
Medium 103.49 7320 23.03.2007
1062 88th 02.03.2007 Kar Irrigation Project Maharas
htra
Medium 170.04 6744 23.03.2007
1063 88th 02.03.2007 Lower Wardha Irrigation Scheme Maharas
htra
Major 857.7 51655 23.03.2007
1064 88th 02.03.2007 Musurumilli Reservoir Project Andhra
Pradesh
Medium 207 15676 23.03.2007
1065 88th 02.03.2007 Lhasi Irrigation Project Rajastha
n
Medium 44.73 6008 26.12.2007
1066 88th 02.03.2007 Construction of Marginal
Embankment on Right Bank of
River Ghaghra & Left Bank of River
Sarda
Uttar
Pradesh
Flood
Protection
46.52
1067 88th 02.03.2007 Dolaithabi Barrage Project Manipur Medium 98.37 7545 10.05.2007
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1068 89
th 27.06.2007 D’zuza Irrigation Scheme Nagala
nd
Medium 75.2 10146
1069 89th 27.06.2007 Punpun Barrage project (Revised) Bihar Major 199.41 13680 05.10.2007
1070 89th 27.06.2007 Madhya Ganga Canal pariyojana
Stage-II,
Uttar
Prades
h
Major 1060.76 225430 12.12.2008
1071 89th 27.06.2007 Lower Indira Irrigation
Project(Reviseid),
Orissa Major 521.13 38870
1072 89th 27.06.2007 Thoubal Multipurpose Project
(Revised)
Manipu
r
Major 715.81 33449
1073 89th 27.06.2007 Chandrabhaga(Barrage) Irrigation
Project
Mahara
shtra
Medium 188.925 8135 05.10.2007
1074 89th 27.06.2007 Sapan (Barrage) Irrigation Project Mahara
shtra
Medium 200.7 7195 05.10.2007
1075 89th 27.06.2007 Uttarman Irrigation Project Mahara
shtra
Medium 123.169 5280/0.5MW 20.09.2007
1076 89th 27.06.2007 Wang Irrigation Project Mahara
shtra
Medium 162.782 7068/3.00MW 20.09.2007
1077 89th 27.06.2007 Morna (Gureghar) Irrigation
Project
Mahara
shtra
Medium 129.641 3075/0.80MW 20.09.2007
1078 89th 27.06.2007 Pentakli Irrigation Project Mahara
shtra
Major 169.67 14332 24.09.2007
1079 89th 27.06.2007 Sidhatha Irrigation Project Himach
al
Medium 66.35 5348 08.11.2007
1080 90th 26.09.2007 Shah Nahar Irrigation Project
(Revised)
Himach
al
Prades
Major 310.89 24772 17.01.2008
1081 90th 26.09.2007 Changer Area LIS (Revised) Himach
al
Prades
Medium 88.09 3.041
1082 90th 26.09.2007 Bateshwar Sthan Ganga Pump Canal,
Phase-I(Revised)
Bihar Major 389.31 27603 10.3.2010
347000
(197000Additio
nal)1084 90th 26.09.2007 Parkachik Khawas Irrigation Canal Jammu
&
Medium 35.44 2262
1085 90th 26.09.2007 Improvement of South Saraswati
River
West
Bengal
Flood
Protection
32.1
1086 90th 26.09.2007 Mahanadi Reservoir Project
(Revised)
Chattisg
arh
Major 845 264000 11.12.2007
1087 90th 26.09.2007 Sangola Branch Canal Project Mahara
shtra
Major 287.77 11288 17.12.2007
1088 90th 26.09.2007 Sulwade Barrage Mahara
shtra
Medium 290.88 8533 10.12.2007
1089 90th 26.09.2007 Sarakhade Barrage Mahara
shtra
Medium 202.48 11320 10.12.2007
1090 90th 26.09.2007 Praksha Barrage Mahara
shtra
Medium 178.91 10180 10.12.2007
1091 91st 07.11.2007 Component of Bagmathi Multi- Purpose
Project
Bihar Flood
Control
135.16 ---- 15.02.2008
1092 91st 07.11.2007 Raising & strengthening of existing
embankment along Kmla River
Bihar Flood
Control
52.0926 --- 15.02.2008
1093 91st 07.11.2007 Flood control Embankments in
Mahananda Basin/Sub-Basin
Bihar Flood
Control
603.88 ---
Bansagar Canal Project (Revised) Major 1674.11 25.04.2008Uttar
Prades
h
1083 90th 26.09.2007
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1094 91st 07.11.2007 Raising & strenthning and Extension of
existing left&R/B in Chandan River
system
Bihar Flood
Control
147.6868 ---
1095 91st 07.11.2007 Raising & strenthning and
Extension of existing Right
Embankment along Gerua River
Jharkha
nd
Flood
Control
20.123 --- 11.07.2008
1096 91st 07.11.2007 Purna Irrigation Project Mahara
shtra
Medium 213.1 7530 25.04.2008
1097 92nd 27.02.2008 Gosikhurd Irri. Project, Revised Mahara
shtra
Major 7777.85 250800 14.05.2008
1098 92nd 27.02.2008 Dudhganga Irr. Project Mahara
shtra
Major 1460.57 81975 02.04.2008
1099 92nd 27.02.2008 Kanhirapuzha Irri. Project (ERM) Kerala Medium 30 2806 01.08.2008
1100 92nd 27.02.2008 Modernization of Canal System of
Bhadra Reservoir Project (ERM)
Karnat
aka
7 951 177337 31.03.2008
1101 92nd 27.02.2008 Hippargi Irrigation Project Karnat
aka
Major 1521.78 74742 04.04.2008
1102 92nd 27.02.2008 Rengali Sub-Project–RBC
(Revised)
Orissa Major 1290.93 143490
1103 92nd 27.02.2008 Chhelligada Dam Project (Revised) Orissa Medium 201.01 3876
1104 92nd 27.02.2008 Khuga Multipurpose Project
(Revised)
Manipu
r
Medium 335.15 14775/1.5 MW 16.10.2008
Orissa Integrated & Water
Management Investment
Programme (OIIAWMIP)-
Tranch-1.a) Mahanadi Chitropola Irrigation
Project (Revised)
Orissa Major 395.45 25160
b) Improvement of Taladanda
Main Canal Project (ERM)
Orissa Major 101.32 53602
c) Improvement of Gohira
Irrigation Project (ERM)
Orissa Medium 23.1 12456
d) Improvement of Remal
Irrigation Project (ERM)
Orissa Medium 12.57 5607
e) Improvement in Sunei
Irrigation Project (ERM)
Orissa Medium 25.93 14159
1106 93rd 22.05.2008 Kudali Irrigation Project Mahara
shtra
Medium-
Revised
271.79 8480 04.02.2009
1107 93rd 22.05.2008 Modernization of New Pratap Canal Jammu
&
Medium 47.6 13309 01.09.2008
1108 93rd 22.05.2008 Anti Erosion Scheme for Protection of
Khaipur, Raghopur, Akidatpur villages
from river Ganga.
Bihar Flood
Control
23.5581 --- 04.08.2008
1109 93rd 22.05.2008 Raising & Strengthening of Tirhut
Embankment from 29.61 km to 83.40
km on the Left Bank of river Gandak.
Bihar Flood
Control
26.2765 ---
1110 94th 09.07.2008 Lower Goi Irrigation Project Madhya
Prades
Major 360.37 15686 12.08.2008
1111 94th 09.07.2008 Lower Pedhi Project Mahara
shtra
Major-
Revised
283.1 17023 14.08.2008
08.08.0893rd 22.05.20081105
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1112 94th 09.07.2008 Upper Kundlika Project Mahara
shtra
Medium-
New
72.7 2800 09.09.2008
1113 95th 20.01.2009 Protection of Sialmari Area from the
erosion of River Brahmaputra
(Construction of Land Spurs and Tie
Bund)
Assam Flood
Control
25.73 --
1114 95th 20.01.2009 Protection of Bhojaikhati, Doloigaon
and Ulubari Area from The erosion of
River Brahmaputra (Construction of
Land Spurs and Tie Bund)
Assam Flood
Control
27.92 --
1115 95th 20.01.2009 Raising & Strengthening to
Brahmaputra Dyke From Sissikalghar to
Tekeliphuta including closing of breach
by retirement and anti Erosion
Measures
Assam Flood
Control
142.42 --
1116 95th 20.01.2009 Raising, strengthening and construction
of Bituminous road over Eastern and
Western Kosi Embankments
Bihar Flood
Control
339.39 -- 18.03.2009
1117 95th 20.01.2009 Raising, strengthening and extension of
existing embankments along Bhutahi
Balan river
Bihar Flood
Control
37.14 -- 18.03.2009
1118 95th 20.01.2009 Breach Closure of Eastern Afflux Bund
in Nepal
Bihar Flood
Control
143.42 -- 22.05.2009
1119 95th 20.01.2009 Proposal for Kosi Barrage Restoration
Work
Bihar New-
Major
86.65 16.03.2009
1120 95th 20.01.2009 Kelo Irrigation Project Chattisg
arh
New-
Major
606.91 22810 20.02.2009
1121 95th 20.01.2009 Channelisation of Bata River from
RD10230 to 19700 Mtr.
Himacha
l
Pradesh
Flood
Control
34.67 1537.81
1122 95th 20.01.2009 Revised Project Estimate for widening,
strengthening and providing 10 m wide
road way on Alipur bund on left bank of
river Yamuna.
Uttar
Pradesh
Flood
Control
46.17 --
1123 95th 20.01.2009 Indira Sagar( Polavaram) Project- Andhra
Pradesh
Revised-
Major
10151.04 436000
1124 95th 20.01.2009 Utawali Medium Irrigation Project,
(Revised Estimate)
Maharas
htra
Medium 109.64 5394 21.07.2009
1125 95th 20.01.2009 Lower Panzara Irrigation project Maharas
htra
New-
Medium
34.73 7585 01.04.2009
1126 95th 20.01.2009 Nandur Madhameshwar Irrigation
Project (Revised Estimate)
Maharas
htra
Major 941.33 45124 17.04.2009
1127 95th 20.01.2009 Kamani Tanda Medium Irrigation
Project
Maharas
htra
New-
Medium
78.49 4750 01.04.2009
1128 95th 20.01.2009 Kandi Canal Extension from
Hoshiarpur to Bachaur (RD 59.50 to
130.00 km) Stage-II (Revised
Estimate)
Punjab Major 346.62 23326 12.04.2010
1129 95th 20.01.2009 Teesta Barrage project 1
stsub stage of
Stage-I of phase-I (Revised)
West
Bengal
Major 2988.61 527000
1130 96th 16.02.2009 Protection of Majuli Island from Flood
and Erosion Phase-II & III,
Assam Flood
Control
115.03 --
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1131 96th 16.02.2009 Restoration of Dibang and Lohit rivers
to their original course at Dholla
Hatighuli (old name: Avulsion of
Brahmputra at Dholla Hatighuli).
Assam Flood
Control
53.11 --
1132 97th 27.03.2009 Raising and strengthening of river
Yamuna in the state of Haryana
Haryana Flood
Control
173.75 -- 11.08.2009
1133 97th 27.03.2009 Punand Irrigation Project (Revised
Estimate)
Maharas
htra
Major 157.78 10,846 22.05.2009
1134 97th 27.03.2009 Rajiv Bhima Lift irrigation Scheme
(Revised Estimate)
Andhra
Pradesh
Major 1969 82151
1135 97th 27.03.2009 Malampuzha Irriagtion project-ERM Kerala Major 11.08 45108/
Stabilization-
1926
05.01.2010
1136 97th 27.03.2009 Chitturpuzha Irrigation Project (ERM) Kerala Major 34.57 33880
stabilization-
4,964
10.03.2010
1137 97th 27.03.2009 Restoring capacity of Sharda Sahayak
system (ERM)
Uttar
Pradesh
Major 319.23 1750000
stabilization-
7,90,000
20.08.2009
1138 97th 27.03.2009 Western Kosi Canal Project (India
Portion)- Revised
Bihar Major 1307.21 234800
1139 98th 09.07.2009 Flood protection works along the Right
bank of river Gandak
Uttar
Pradesh
Flood
Control
63.7022 145364
1140 98th 09.07.2009 Flood protection works along the Left &
Right bank of river Ghaghra
Uttar
Pradesh
Flood
Control
110 48612
1141 98th 09.07.2009 Minimata (Hasdeo) Bango Multipurpose
Scheme (Revised)
Chattisg
arh
Major 1660.88 433000 07.12.2010
Completed
in XI Plan
1142 98th 09.07.2009 Renovation and Restoration of Bheema
Samudra Tank (New)
Karnata
ka
Medium 9.375 2530
1143 98th 09.07.2009 Punasa Lift irrigation Scheme (Revised) Madhya
Pradesh
Major 488.08 36758 18.09.2009
1144 98th 09.07.2009 Dongargaon Tank Project (Revised) Maharas
htra
Medium 67.039 3942 16.09.2009
completed in
XI Plan
1145 98th 09.07.2009 Krishna-Koyna Lift Irrigation Scheme
(new)
Maharas
htra
Major-
Revised
2224.76 121256 13.10.2009
1146 98th 09.07.2009 Kanupur Multipupose Project (Revised) Orissa Major 1067.51 47709 2.12.2009
1147 98th 09.07.2009 Upper Indravati Irrigation Project
(Revised)
Orissa Major 564.77 41794 24.02.2010
1148 98th 09.07.2009 Lower Indra Irrigation Project (Revised) Orissa Major 1182.23 38870 02.12.2009
1149 98th 09.07.2009 Subarnarekha Irrigation Project
(Revised)
Orissa Major 4049.93 187462 05.02.2010
1150 98th 09.07.2009 Relining of Rajasthan feeder from RD
179000 to 496000-ERM
Punjab Major 952.1 93117 23.11.2009
1151 98th 09.07.2009 Relining of Sirhind feeder from RD
119700 to 447927-ERM
Punjab Major 489.165 34548 23.11.2009
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1152 98th 09.07.2009 Eastern Ganga Canal Project(Revised) Uttar
Pradesh
Major 892.44 105000 22.01.2010
completed in
XI Plan
1153 99th 24.08.2009 Restoration of Eastern Kosi Canal
System
Bihar Major 750.75
(2008)
735500
1154 99th 24.08.2009 Krishna Delta Modernization Scheme
including Pulichintala Dam Project
(New)
Andhra
Pradesh
Major 3684.5(2411.
25+1273.25)
575000 25.02.2010
1155 99th 24.08.2009 Koserteda Irrigation Project (Revised) Chattisg
arh
Medium 154.65 11120 10.05.2010
Completed
in XI Plan
1156 99th 24.08.2009 Gandorinala Irrigation Project (Revised) Karnata
ka
Medium 240 11655 26.11.2009
completed in
XI Plan
1157 99th 24.08.2009 Indira Sagar Multipurpose Project
(Revised)
Madhya
Pradesh
Major 3182.77 16900/1000
MW
14.06.2010
1158 99th 24.08.2009 Omkareshwar Multipurpose project
(Revised)
Madhya
Pradesh
Major 2504.8 283324
1159 99th 24.08.2009 Mahi Irrigation Project (Revised) Madhya
Pradesh
Major 490.39 26429 20.09.2011
completed in
XI Plan1160 99th 24.08.2009 Upper Beda Irrigation Project (Revised) Madhya
Pradesh
Medium 224.41 13400
1161 99th 24.08.2009 Gul River Project (Revised) Maharas
htra
Medium 96.62 3025 29.01.2010
1162 99th 24.08.2009 Shahpurkandi Dam Project (Revised) Punjab Major 2285.81(Irr.6
53.97
37173/168MW 08.02.2010
1163 99th 24.08.2009 Modernization of Lahchura dam
(Revised)
Uttar
Pradesh
Major 299.36 46485 23.11.2009
1164 100th 09.10.2009 Upper Sankh Reservoir Scheme
(Revised)
Jharkha
nd
Medium 141.19 7,069 11.06.2010
completed in
XI Plan
1165 100th 09.10.2009 Panchkhero Reservoir Scheme
(Revised)
Jharkha
nd
Medium 75.69 2,601 06.07.2010
completed in
XII Plan
1166 100th 09.10.2009 Surangi Reservoir Scheme (Revised) Jharkha
nd
Medium 41.17 2,601 originally
approved on
01.03.1982,
Completed
in XI Plan
1167 100th 09.10.2009 Ghataprabha Stage-III Project
(Revised)
Karnata
ka
Major 1210.51 1,77,822 15.12.2009
completed in
XI Plan
1168 100th 09.10.2009 Malaprabha Project (Revised) Karnata
ka
Major 1383.48 1,96,132 completed in
XI Plan
1169 100th 09.10.2009 Bhima Lift Irrigation project (New) Karnata
ka
Major 551.93 (PL-
2008-09)
24,292 15.12.2009
1170 100th 09.10.2009 Karanja Irrigation Project (Revised) Karnata
ka
Major 532 44,574 15.12.2009
1171 100th 09.10.2009 Upper Krishna Project Stage-I
(Revised)
Karnata
ka
Major 6891.59 4,59,000 22.01.2010
1172 100th 09.10.2009 Upper Krishna Project Stage-II
(Revised)
Karnata
ka
Major 3959.8 2,27,000 22.01.2010
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1173 100th 09.10.2009 Guddada Mallapua Lift Irrigation
scheme (New)
Karnata
ka
Medium 115.4 5,261 15.12.2009
1174 100th 09.10.2009 Bargi Diversion project (Revised) Madhya
Pradesh
Major 5127.22 3,77,000 17.12.2009
1175 100th 09.10.2009 Sagar Medium Irrigation Project (New) Madhya
Pradesh
Medium 239.99 17,061 12.04.2010
1176 100th 09.10.2009 Dolaithabi Barrage project (Revised) Manipur Medium 215.52 7,545 01.01.2010
completed in
XI Plan
1177 100th 09.10.2009 Khuga Irrigation Project (Revised) Manipur Medium 381.28 14,755 12.04.2010
1178 100th 09.10.2009 Gumti Irrigation Project (Revised) Tripura Medium 83.01 9,800 25.03.2010
1179 100th 09.10.2009 Manu Irrigation Project (Revised) Tripura Medium 98.71 7,600 25.03.2010
1180 100th 09.10.2009 Khowai Irrigation Project (Revised) Tripura Medium 91.64 9,320 25.03.2010
1181 100th 09.10.2009 Arjun Sahayak Pariyojna (New) Uttar
Pradesh
Major 806.5 1,49,764 23.11.2009
1182 100th 09.10.2009 Bank Protection works along both
banks of river Bhagirathi at Sundarpur
& Basantpur, Kazipara to Nabagram &
Saharbati to Uttarasan
West
Bengal
Flood
Control
23.67 529 21.12.2009
1183 100th 09.10.2009 Bank Protection works along right bank
of river Ganga-Padma at Ichalipara,
Moya, Galadarya, Paschim Beechpara
West
Bengal
Flood
Control
28.14 300 21.12.2009
1184 101st 30.11.2009 Raising and strengthening to Puthimari
embakment on both banks from RG
Railway line to RA Pailway line( from ch
21st km to Ch 36th km on right bank
and from chainage 18th km to 35th km
on Left bank)
Assam Flood
Control
30.23 A.P-15,000
1185 101st 30.11.2009 Anti erosion measures to protect
Bramhputra Dyke on left Bank from
Gumi to Kalatoli at Goroimari- Major top
area in between ch 27.8 km to ch 31.9
km.
Assam Flood
Control
27.97 A.P-5,000
1186 101st 30.11.2009 Protection of Gakhirakhaitee and its
adjoining area from the erosion of river
Brahmaputra
Assam Flood
Control
19.06 A.P-20,000
1187 101st 30.11.2009 Flood protection works in Kolli Dam
(Coleroon)
Tamil
Nadu
Flood
Control
375.9 A.P-2,53,091 15.01.2010
1188 101st 30.11.2009 Flood protection works in Yanam. Puduche
rry
Flood
Control
139.67 A.P-81 22.01.2010
1189 101st 30.11.2009 Nepal Benefit Scheme-2009 Gandak
Project (New)
Bihar Major 171.84 69,600 21.06.2010
1190 101st 30.11.2009 Batane Reservoir Project (Revised) Bihar Major 113.81 12,126 12.05.2010
1191 101st 30.11.2009 Punpun Barrage project (Revised) Bihar Major 658.12 13,680 10.03.2010
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1192 101st 30.11.2009 Modernisation of Ranbir Canal Project
(Revised)
Jammu
&
Kashmir
Major 176.89 55,418 06.05.2010
1193 101st 30.11.2009 Bariyarpur Left bank canal Project
(Revised)
Madhya
Pradesh
Major 477.26 43,850 11.03.2010
completed in
XI Plan
1194 101st 30.11.2009 Bansagar Canal Project - Unit- II
(Revised)
Madhya
Pradesh
Major 2143.65 2,49,359 25.02.2010
1195 101st 30.11.2009 Sindh Piver Project Phase - II (Revised) Madhya
Pradesh
Major 2045.74 1,62,100 25.03.2010
1196 101st 30.11.2009 Singhpur Irrigation Project (New) Madhya
Pradesh
Medium 200.52 6,000 25.03.2010
1197 101st 30.11.2009 Bah Irrigation Project (Revised) Madhya
Pradesh
Medium 250.33 17,807 25.03.2010
1198 101st 30.11.2009 Dhom Balkawadi Tunnel Irrigation
Project (Revised)
Maharas
thra
Major 848.89 12,670 09.02.2010
1199 101st 30.11.2009 Tillari Irrigation Project (Revised) Maharas
thra &
Goa,
joint
Major 1612.15 30,733 23.02.2010
1200 101st 30.11.2009 Thoubal Multipupose Project (Revised) Manipur Major 982 33,449 13.04.2010
1201 101st 30.11.2009 Lower Suktel Irrigation Project
(Revised)
Orissa Major 1041.81 29,845 16.03.2010
1202 101st 30.11.2009 Telengiri Irrigation Project (Revised) Orissa Medium 474.05 13,789 10.03.2010
1203 101st 30.11.2009 Tatko Irrigation Project (Revised) West
Bengal
Medium 19.76 2,494 completed
with liabilities
in XII Plan
1204 101st 30.11.2009 Patloi Irrigation Project (Revised) West
Bengal
Medium 17.28 2,158 15.07.2011
completed in
XI Plan
1205 102nd 28.01.2010 Emergent Measures for Protection of
Rohmoria in Dibrugarh District, Assam.
Assam Flood
Control
59.91 18,000 15.02.2010
1206 102nd 28.01.2010 Raising & Strengthening of
Existing Left & Right Embankments
in Lower Reach of Mahananda
River, Bihar
Bihar Flood
Control
149.69 85.09 17.03.2010
1207 102nd 28.01.2010 Raising, Strengthening of Left
Burhi Gandak Embankment U/s of
Akharaghat Bridge from Minapur to
Vijay Chapra & in D/s from
Akharaghaat Bridge to Samastipur
District Border(0 to 45.5 km),
Bihar
Bihar Flood
Control
22.41 30,000 06.07.2010
1208 102nd 28.01.2010 Anti Erosion Work along the left
bank of river Ganga (1) at Ramdiri-
Sihama Erosion Site near Gupta
Embankment (2) near Gupta
Lakhminia Embankment (3) near
Sanaha Gorgama Embankment &
(4) Raising and strengthening of
Gogari Narayanpur Embankment,
Nayagaon
Bihar Flood
Control
29.33 25,000 06.07.2010
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1209 102
nd 28.01.2010 Construction of Embankment along
river Jhim and Jamura (Adhwara
Group) From Sonbarsa Bajar to
Sonbarsa vllage on Left Bank
(25.71 Km) and Right Bank
(26.06Km), Bihar.
Bihar Flood
Control
64.52 17,400 06.07.2010
1210 102nd 28.01.2010 Extension of Embankment on Left
and Right bank of River Kamala
Balan in lengths of 11.42km and 5
km with Brick soling road on top in
left over reaches and protection
work at two points on extended
portion of right Kamla Balan
embankment, Bihar.
Bihar Flood
Control
56.12 3,16,000 06.07.2013
1211 102nd 28.01.2010 Comprehensive flood management
works to Vellar basin in Cuddalore
and Villupuram districts of Tamil
Nadu.
Tamil
Nadu
Flood
Control
164.32 24,498
1212 102nd 28.01.2010 Comprehensive flood management
works to Panduti and Cuddalore
towns from ivers Pennaiyar,
Gadilam, Uppanar, Paravanar and
south Malattar in Cuddalore district
of Tamil Nadu.
Tamil
Nadu
Flood
Control
68.41 19,347
1213 102nd 28.01.2010 Project for proposed flood
protection works along left and
right bank of river Ganga in
District J.P. Nagar, Shahajahnpur,
Meerut and Bulandshahr, U.P
Uttar
Pradesh
Flood
Control
32.42 14,360
1214 102nd 28.01.2010 Project for reconstruction,
remodeling and improvement of
embankments in Sundarban and
adjoining areas in the districts of
North & south 24 Parganas,
damaged by severe cyclone
“AILA”, West Bengal
West
Bengal
Flood
Control
5032 2,100 Sq.km 12.03.2010
1215 102nd 28.01.2010 Scheme for Kaliaghai-Kapaleswari-
Baghai Drainage Basin, West
Bengal.
West
Bengal
Flood
Control
650.38 621 Sq.km 09.03.2010
1216 102nd 28.01.2010 Mitigation of Flood in Group – I, 14
Padasekharans in Kuttanad of
Kerala
Kerala Flood
Control
24.7 --
1217 102nd 28.01.2010 Bansagar Dam (Unit I) Project, Madhya
Pradesh(Revised)
Madhya
Pradesh
Major 1582.94 4,93,000
1218 102nd 28.01.2010 Khadakpurna River Project,
Maharashtra. (Revised)
Maharas
htra
Major 917.95 24,864 19.01.2012
1219 102nd 28.01.2010 Tarali Irrigation Project,
Maharashtra. (Revised)
Maharas
htra
Major 870.9 19,498 11.03.2010
1220 102nd 28.01.2010 Upper Penganga Project,
Maharashtra (Revised)
Maharas
htra
Major 3038.42 1,16,728 12.04.2010
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1221 102
nd 28.01.2010 Lower Dudhana Irrigation Project,
Maharashtra.(Revised)
Maharas
htra
Major 1349.5 44,482 24.02.2010
1222 102nd 28.01.2010 Umarhut Pump Canal Phase-II (New-
ERM)
Uttar
Pradesh
Major 73.69 49948
(Restoation
19,820)
originally
approved on
17.02.1977
1223 103rd 11.03.2010 Champamati (Barrage) Irrigation project
(Revised)
Assam Major 309.22 24,994 originally
approved on
29.4.1980
1224 103rd 11.03.2010 Sardar Sarovar Narmada project
(Revised)
Gujarat Major 39240.45
( 2008-09
PL)
17,92,000 20.05.2010
1225 103rd 11.03.2010 Rehabilitation, Modernisation of drains
to recharge the Ground water (ERM)
Haryana Major 67.28 159311
(Restoration
28822)
03.06.2011
1226 103rd 11.03.2010 Modernisation of Chadrampalli project
(ERM)
Karnata
ka
Medium 14.93 8446
(Restoation
1935 ha)
1227 103rd 11.03.2010 Modernisation of Hattikuni project
(ERM)
Karnata
ka
Medium 6.75 2145
(Restoration
956 ha)
1228 103rd 11.03.2010 Modernisation of Upper Mullamari
project (ERM)
Karnata
ka
Medium 8.21 3279
(Restoration
1500 ha)
1229 103rd 11.03.2010 Mahan (Gulab Sagar) Irrigation Project
(Revised)
Madhya
Pradesh
Major 486.96 19,740 25.03.2011
completed in
XI I Plan
1230 103rd 11.03.2010 Jobat Medium Irrigation project
(Revised)
Madhya
Pradesh
Medium 230.61 12,507 02.08.2010
1231 103rd 11.03.2010 Ghungshi Barrage Medium Irigation
Project
Maharas
htra
New-
Medium
170.15 6,660
12.04.2010
1232 103rd 11.03.2010 Extensiion, Renovation and
modernisation of Canal being fed from
River Sutlej- ERM
Punjab Major 734.46 6,67,000
(Restoration
198,924 ha )
additional
8144 ha
1233 103rd 11.03.2010 Narmada Canal Project (Revised) Rajastha
n
Major 2481.49 1,51,000 09.07.2010
1234 103rd 11.03.2010 Saryu Nahar Pariyojana (Revised) Uttar
Pradesh
Major 7270.32 1,44,000 16.04.2010
completed
with liabilities
in XII Plan
1235 103rd 11.03.2010 Tral Lift Irrigation scheme (Revised) Jammu
&
Kashmir
Medium 140.76 6,000 Originally
approved on
02.01.1979
1236 103rd 11.03.2010 Rajpora Medium Irrigation scheme
(Revised)
Jammu
&
Kashmir
Medium 70.2 2,429 12.05.2010
1237 104th 12.05.2010 Karra Nalla Irrigation Project Chattisgarh New-
Medium
99.19 4,100
22.06.2010
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1238 104
th 12.05.2010 Ghumariya Nalla Irrigation Project Chattisgarh New-
Medium
47.79 3,200
09.07.2010
1239 104th 12.05.2010 Sutiapat Irrigation Project (Revised) ChattisgarhMedium 98.62 6,960
09.07.2010
1240 104th 12.05.2010 Improving Irrigation Intensity of Hardoi
Branch System (Revised - ERM)
Uttar
Pradesh
Major 135.17 3,06,055
(Restoration
95,961 ha )Ist revised
approved on
08.12.2006
1241 104th 12.05.2010 Rajiv Sagar (Bawanthadi) (Revised) Madhya
Pradesh
&
Maharas
Major 161.57 57,120
1242 104th 12.05.2010 Purna Barrage-II (Ner Dhamana)
medium Irrigation Project
MaharashtraNew-
Medium
179.28 7,302 17.07.2010
1243 104th 12.05.2010 Upper Manar Irrigation Project
(Revised)
MaharashtraMedium 525.4 12,420 16.07.2010
1244 104th 12.05.2010 Modernization of Zaingir Canal Irrigation
Project (ERM)
Jammu & KashmirMedium 73.51 7,100 originally
approved on
8.6.2001
1245 104th 12.05.2010 Modernization of Lar Canal Project
(ERM)
Jammu & KashmirMedium 47.72 2,231 (
Additional
617Ha)
1246 104th 12.05.2010 Modernization of Grimtoo canal (ERM) Jammu & KashmirMedium 99.09 4,734
1247 104th 12.05.2010 Restoration & Modernization of main
Ravi canal and its distribution system
(ERM)
Jammu & KashmirMajor 62.27 50749
(Restoration
15,016)
1248 104th 12.05.2010 Raising and strengthening of Left and
Right Embankment along None River
Bihar Flood
Control
26.71 A.P 2,72,000 02.08.2010
1249 104th 12.05.2010 Flood Threat of River Jhelum Jammu & KashmirFlood
Control
97.46 --
1250 104th 12.05.2010 Regulation of Flood water in Kayal
Area, 4 Padasekhrams and Mitigation
of Floods in Group-9, 5 Padasekharams
in Kuttanad Region of Kerala
Kerala Flood
Control
118.91 3,266
1251 104th 12.05.2010 Flood protection works of river Yamuna,
Saharanpur district
Uttar PradeshFlood
Control
28.113 20villages
1252 104th 12.05.2010 Flood Protection works along Left and
Right Bank of River Rapti
Uttar PradeshFlood
Control
68.82 365.48 sq.km
1253 104th 12.05.2010 Flood protection works along left and
right bank of river Yamuna
Uttar PradeshFlood
Control
43.80 18,633
1254 104th 12.05.2010 Construction of embankment along left
bank of river Ganga in district J P Nagar
and Bijnor
Uttar PradeshFlood
Control
33.23 4,000
1255 104th 12.05.2010 Anti-erosion works to protect sensitive
cluster of villages along right bank of
river Ghaghra in district Lakhimpur
Kheri
Uttar PradeshFlood
Control
30.40 195
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1256 104
th 12.05.2010 Anti-erosion works to protect sensitive
cluster of villages along left and right
bank of river Sarda in district Lakhimpur
Kheri and Sitapur
Uttar PradeshFlood
Control
25.04 140
1257 105th 25.06.2010 Restoration Works of Eastern Gandak
Canal system (Revised)
Bihar Major 684.78 6,62,000
(Restoration
4,36,000 ha.)
Ist Revised
approved on
31.03.2004
& 2nd
revised on
date
04.11.2010
1258 105th 25.06.2010 Khrung Tank Project-ERM Chattisgarh Major 101.04 56,300
(Additnl.Irri.
15,300)
25.08.2010
1259 105th 25.06.2010 Halon Irrigation Project Madhya
Pradesh
New-
Major
414.21 16,782 15.04.2011
1260 105th 25.06.2010 Man Irrigation Project Madhya
Pradesh
Revised-
Major
246.03 17,700 31.12.2010
1261 105th 25.06.2010 Upper Narmada Irrigation Project Madhya
Pradesh
New-
Major
683.93 26,622 05.12.2010
1262 105th 25.06.2010 Shelgaon Barrage project MaharashtraNew-
Medium
446.49 11,318
1263 105th 25.06.2010 Rengali Irrigation Sub-Project–LBC-II
(Revised)
Orissa Major 1958.34 1,77,651 Originally
approved on
17.11.1998
1264 105th 25.06.2010 Kachnoda Dam Project (Revised) Uttar PradeshMajor 423.45 10,850 02.08.2010
1265 105th 25.06.2010 Flood Protection Works to Brahmani-
Kelua-Birupa Doab of Brahmani system
of Orissa State
Orissa Flood
Control
32.32 17,100
1266 105th 25.06.2010 Revised Project Estimate for
constructon of right Marginal bund on
river ganga from Bhogpur to Balawali
Uttarakh
and
Flood
Control
20.69 9,000
1267 105th 25.06.2010 Scheme for Desisting of river Ichamati
along the common border portion for
better drainage and flood management.
West
Bengal
Flood
Control
38.23 225 sq.km
1268 106th 16.09.2010 J. Chokka Rao Godavari Lift Irrigation
Scheme (Revised)
Andhra
Pradesh
Major 9427.73 2,85,724 15.07.2011
1269 106th 16.09.2010 Durgawati Reservoir Project (Revised) Bihar Major 983.10 39,610 08.08.2012
1270 106th 16.09.2010 Maniyari Tank Project - ERM Chattisgarh Major 159.95 64,771 06.12.2010
1271 106th 16.09.2010 Balh Valley (Left Bank) Irrigation project
(Revised)
Himacha
l
Pradesh
Medium 103.78 4,354 05.04.2011
completed in
XI Plan
1272 106th 16.09.2010 Gumani Barrage Project (Revised) Jharkha
nd
Major 185.76 16,194 10.02.2011
completed
with liabilities
in XII Plan
1273 106th 16.09.2010 Kandi Canal extension from Hoshiarpur
to Balachur, Stage-II (Revised)
Punjab Major 540.24 23,326 12.04.2010
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1274 106
th 16.09.2010 Modernisation of Gang Canal system
(Revised)
Rajasthan Major 621.42 281,050(
Adtinl
Irr.96,510)
31.12.2010
completed in
XII Plan
1275 106th 16.09.2010 Badaun Irrigation Project Uttar PradeshNew-
Major
332.12 37,453 18.11.2010
1276 106th 16.09.2010 Bansagar Canal Project (Revised) Uttar PradeshMajor 3148.91 1,50,132 05.12.2010
1277 106th 16.09.2010 Kanhar Irrigation Project Uttar PradeshNew-
Major
652.58 27,898 05.12.2010
1278 106th 16.09.2010 Restoring capacity of Western Gandak
Canal system – ERM
Uttar PradeshMajor 217.12 332,000
(Rstrn.178,000
)
06.12.2010
1279 106th 16.09.2010 Raising & Strengthening to tributary
dyke of Kopilli river from Charaihagi to
Tuklaitup, Basundhari to Killing Kopilli
junction (L/B) and Chapormukh to
Ahotguri Amsoi PWD road including
anti erosion measures at different
reaches.
Assam Flood
Control
110.72 26,000
1280 106th 16.09.2010 Assam integrated Flood & River Bank
erosion Risk Management project
–Dibrugarh Sub Project.
Assam Flood
Control
61.33 32,614
1281 106th 16.09.2010 Assam integrated Flood & River Bank
erosion Risk Management project
–Palasbari Sub Project.
Assam Flood
Control
129.49 65,152
1282 107th 27.10.2010 Raisa Reservoir Scheme Jharkha
nd
New-
Medium
81.11 3,145
10.02.2011
1283 107th 27.10.2010 Tajna Reservoir Scheme Jharkha
nd
New-
Medium
87.76 5,670 10.02.2011
completed
with liabilities
in XII Plan
1284 107th 27.10.2010 Kachhal Irrigation Project Madhya
Pradesh
New-
Medium
62.48 3470 09.03.2011
1285 107th 27.10.2010 Upper Kaketo Irrigation Project Madhya
Pradesh
New-
Medium
196.27 3423 15.04.2011
1286 107th 27.10.2010 Flood protection works along banks of
river Tunga at Shimoga town from Ch
11.754 km to ch. 14.410 km and Mattur
village from Ch. 6.006 km to Ch. 7.036
km in Shimoga District
Karnata
ka
Flood
Control
55.18 11
1287 107th 27.10.2010 Flood protection works for Hemavathi
river (Ch 29.50 km – 31.5 km) at
Holenarasipur in Hassan Distict.
Karnata
ka
Flood
Control
25.48 7
1288 107th 27.10.2010 Flood protection works along left and
right bank of river Rapti in District
Siddarthnagar, Sant Kabir Nagr,
Gorakhpur &Deoria, U. P.
Uttar
Pradesh
Flood
Control
52.29 422.33 sq. km
1289 108th 04.01.2011 Siddhata Irrigation Project (Revised) Himacha
l
Pradesh
Medium 95.29(PL-
2010)
5348 05.04.2011
completed in
XI Plan
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1290 108
th 04.01.2011 Mitigation of Flood in Kuttanad of
Kerala in respect of Phase – I (Group
2to5,7,8 &10to 19)
Kerala Flood
Control
379.05(PL-
2010)
9311
1291 108th 04.01.2011 Indira Sagar (Polavaram) Project
(Revised)
Andhra
Pradesh
Major 16010.45(PL-
2010)
(Irri.9307.54)
436827
1292 108th 04.01.2011 Lower Wardha Project (Revised)
Maharashtra
Major 2232.41(PL-
2008-09)
63333
18.03.2011
1293 108th 04.01.2011 Relining of Indira Gandhi main Canal,
Stage-I (ERM)
Rajasthan Major 401.63(PL-
2010)
71892 28.04.2011
1294 108th 04.01.2011 Indira Gandhi Nahar Project, Stage-II
(Revised)
Rajasthan Major 6921.32(PL-
2010)
901000 08.06.2011
1295 109th 14.03.2011 Phina Singh Irrigation Project Himacha
l
Pradesh
New-
Medium
204.51(PL-
2011)
8472 15.07.2011
1296 109th 14.03.2011 Subernarekha Multipurpose Project
(Revised)
Jharkha
nd
Major 6613.74(PL-
2010)
2,36,84625.05.2011
1297 109th 14.03.2011 Kushalpura Irrigation Project Madhya
Pradesh
New-
Medium
83.975(PL-
2009) 7540 12.08.2011
1298 109th 14.03.2011 Bagharru Irrigation Project Madhya
Pradesh
New-
Medium
50.57(PL-
2009) 3350 12.08.2011
1299 109th 14.03.2011 Rehti Irrigation Project Madhya
Pradesh
New-
Medium
48.77(PL-
2009) 2905 12.08.2011
1300 109th 14.03.2011 Waghur River Project (Revised) Maharas
htra
Major 1183.55(PL-
2009)
164789
(Restoration-
60642 ha)
19.05.2011
1301 109th 14.03.2011 Urmodi Irrigation Project Maharas
htra
New-
Major
1417.75 (PL-
2009-10)
17085
09.06.2011
1302 109th 14.03.2011 Tembhu Lift Irrigation Project Maharas
htra
New-
Major
3450.35 (PL-
2009-10)
7692
09.06.2011
1303 109th 14.03.2011 Bodwad Parisar Sinchan Yojna Maharas
htra
New-
Major
2178.67 (PL-
2009-10)
4,88,682
06.05.2011
1304 109th 14.03.2011 Anti erosion & flood protection work in
Dikrong Basin in Papumpare District
Arunach
al
Pradesh
Flood
Control
23.68(PL-
2010)
2010 1690
1305 109th 14.03.2011 Anti erosion & flood protection work in
Bhareli sub basin in East Kameng
District
Arunach
al
Pradesh
Flood
Control
16.81(PL-
2010)
2010 1000
1306 109th 14.03.2011 Anti erosion & flood protection work in
Siyom Basin in West Siang District
Arunach
al
Pradesh
Flood
Control
29.64(PL-
2010)
2010 2782
1307 109th 14.03.2011 Anti Erosion works along River Ganga
(i) Near village Kasimchak in Danapur
diara on left bank, (ii) Downstream of
Mokama bridge on the left bank, (iii)
Downstream of Vikramshila bridge on
the left bank, (iv) Town protection work
near Patna City and Ramnagar Diara
on the right bank and (v) Near village
Mathurpur Ami on the left bank
Bihar Flood
Control
63.54(PL-
2010)
48280 29.08.2011
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1308 109th 14.03.2011 Anti erosion works at Koerpatti between
27 mile to 32 mile of Champaran
embankement on the left bank of river
Gandak in the District West Champaran
of Bihar
Bihar Flood
Control
19.8(PL-
2011)
2500
1309 109th 14.03.2011 Scheme for breach closure of Saran
embankment, anti erosion works and
raising and strengthening of Pathara
Chharki embankment on river Gandak
in Bihar
Bihar Flood
Control
57.15(PL-
2011)
460 sq.km
1310 109th 14.03.2011 Scheme for flood protection works of
Pipra-Piprasi embankment on right
bank river Gandak
Bihar Flood
Control
21.73(PL-
2010)
323.84 sq.km
1311 109th 14.03.2011 Bagmati Flood Management Project -
Phase II
Bihar Flood
Control
596.51(PL-
2011)
290000
1312 110th 20.07.2011 Rehabiliation, Renovation and
Modernisation of critically damaged
channels of Haryana irrigation network-
ERM
Haryana Major 115.94(PL- 1,46,000 27.01.2012
1313 110th 20.07.2011 Sri Rameshwar Lift Irrigation Scheme Karnata
ka
New-
Major
331.55(PL- 41,052 01-11-2011
1314 110th 20.07.2011 Rajghat Canal Project-ERM Madhya
Pradesh
Major 34.15(PL- 164789 01-11-2011
1315 110th 20.07.2011 Rangwan High Level Canal System-
ERM
Madhya
Pradesh
Major 39.04(PL- 17085 01-11-2011
1316 110th 20.07.2011 Urmil Right Bank canal system-ERM Madhya
Pradesh
Major 45.69(PL- 7692 01-11-2011
1317 110th 20.07.2011 Bembla River Project (Revised) Maharah
stra
Major 2166.35 (PL- 70756 21.09.2011
1318 110th 20.07.2011 Shahnehar Irrigation Project (Revised) Himacha
l
Pradesh
Major 387.17 (PL- 24772 30.11.2011
completed in
XI Plan
1319 110th 20.07.2011 Anti Erosion & Flood Protection work in
Tawangchu basin in Arunachal
Pradesh.
Arunach
al
Pradesh
Flood
Control
36.47
(PL-2010)
4060 ha
(Population-
18400 nos.)
1320 110th 20.07.2011 Protection of Majuli Island from flood
and erosion Phase-II & III.
Assam Flood
Control
115.99
(PL-2010)
1246 sq km 28-11-2011
1321 110th 20.07.2011 Restoration of rivers Dibang and Lohit
to their original corrses at Dholla
Hatighuli course
Assam Flood
Control
54.43
(PL-2010)
16197 ha 28-11-2011
1322 110th 20.07.2011 Flood Protection works for river banks
of Bhadra river (Ch. Km 29.659 - km
31.932) at Bhadravathi town of
Shimoga District
Karnata
ka
Flood
Control
86.16
(PL-2010-11)
22 ha
(Population-
35000.)
1323 110th 20.07.2011 Protection of balat Village from flood
and erosion of river Umngi in west
Khashi Hill District
Assam Flood
Control
5.63
(PL-2008-09)
300 ha
(Population-
3250.)
1324 110th 20.07.2011 Ullal Costal Erosion & Inlet
Improvement Project
Karnata
ka
Coastal
Protectio
n
170.7
(PL-2011)
Protection to
fish
processing
industries
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1325 110
th 20.07.2011 Mirya Bay Coastal Protection Project Maharas
htra
Coastal
Protectio
n
62.51
(PL-2011)
Protection to
fish
processing
industries
1326 111th 17.08.2011 Flood Protection and Training works on
Phyang Nallah
Jammu
&
Kashmir
Flood
Control
58.57
(PL-2010-11)
109.8 ha
Population
:5600 nos.)
1327 111th 17.08.2011 Flood Protection and Training works on
Igoo Nala
Jammu
&
Kashmir
Flood
Control
35.83 (PL
2010-11)
38.25 ha
(Population
:3500 nos.)
1328 111th 17.08.2011 Flood Protection and Training works on
Saboo Nallah
Jammu
&
Kashmir
Flood
Control
47.04 (PL
2010-11)
46.85 ha
(Population
:7700 nos.)
1329 111th 17.08.2011 Flood Protection and Training works on
Ney Basco Nallah
Jammu
&
Kashmir
Flood
Control
59.41(PL
2010-11)
69.60 ha
(Population
:4700 nos.)
1330 111th 17.08.2011 Flood Protection and Training works on
Nimoo Nallah
Jammu
&
Kashmir
Flood
Control
26.25 (PL
2010-11)
39.05 ha
(Population
:3300 nos.)
1331 111th 17.08.2011 Mitigation of floods in Onattukara
Region comprising of 12 watersheds in
Kerala State
Kerala Flood
Control
248.39 (PL-
2010)
5890 ha
(Population:40
322 family)
1332 111th 17.08.2011 Flood Protection works for river banks
of Kabini river (Ch km 0- km1.68) at
Suttur Mutt Township, Najangud Taluk
of Mysore District
Karnata
ka
Flood
Control
26.93 (PL
2010-11)
120 ha
(Population-
6000)
1333 111th 17.08.2011 Protection of Biswanath panpur
including areas of uptram Silamari and
Far downstream Bhumuraguri to
Borgaon aginst erosion of the river
Brahmaputra.
Assam Flood
Control
167.09 (PL
2010-11)
33693 ha
(Population-
1.5 lakh)
1334 112th 14.09.2011 Mahi Right Bank Canal project- ERM Madhya
Pradesh
Major 300.01 1,83,000 ha
(Restoration
8500 ha)
17.05.2012
1335 112th 14.09.2011 Improvement of Kakrapar RBMC (0 to
60.98 km) and Ukai RBMC (0 to 35.06
km) and LBMC system-ERM
Gujarat Major 296.51
( 2009-PL)
134503
(including
restoration of
3500 ha)
13.03.2012
1336 112th 14.09.2011 Upper Kundalika Project- Revised Maharas
htra
Medium 154.916 ( PL
2009-10)
2800 19.12.2011
1337 112th 14.09.2011 Maharashtra Water sector Improvement
Project (MWSIP) (World Bank Aided)-
ERM
Maharas
htra
Major-
ERM
2351.5 (PL
2010-11)
5,16,704 ha
1338 112th 14.09.2011 Flood Protection works of Lendi nalla at
Katol town
Maharas
htra
Flood
Control
24.37 (PL
2009-10)
28 ha
(Population
:808 nos.)
24-10-2011
Restricted to
Rs. 21.11 cr
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1339 112
th 14.09.2011 Flood Protection works for Hemavathi
River at Bankal town and six villages
viz. Bankenhalli, Hydaragudda,
Bakkihalla, Mugrehalli, Kittlegandi and
Subramanya villages (Ch: km 9.41- km
32.3) of midigere Taluk in Chikmangalur
District
Karnata
ka
Flood
Control
47.56 (PL
2010-11)
290 ha
(Population:
1500 person)
25-10-2011
1340 112th 14.09.2011 Stabilization of Seer Khad and Flood
Protection Works from Jahu to Bum
Himacha
l
Pradesh
Flood
Control
23.17 (PL
2010)
12 ha
(Population:
5370 person)
02-11-2011
1341 112th 14.09.2011 Flood Protection works for River Banks
of Ghataprabha river at Gokak Town of
Belgaum District
Karnata
ka
Flood
Control
34.07 (PL
2010-11)
146 ha
(Population:
1400 person)
1342 112th 14.09.2011 Improvement of Storm water Drainage
below Greenfield Airport at Pakyong
Sikkim Flood
Control
48.55 171.43 ha
(Population:
1800 person)
28.11.2011
1343 113th 12.01.2012 Eastern Gandak Canal System
(Gandak Phase-II),
Bihar Mjajor-
New-
ERM
1799.50 1,46,000 12/13.9.12
1344 113th 12.01.2012 Udersthan Barrage & other Iner-
connected and Independent Schemes.
Bihar Major-
New-
ERM
531.01 (Pl
2011-12)
41,052 28.05.2012
1345 113th 12.01.2012 Madhya Pradesh Water Sector
Restructuring Project (MPWSRP)
Madhya
Pradesh
New-
ERM
1919 (PL-
2011-12)
4,88,682 11-05-2012
1346 113th 12.01.2012 Orissa Integrated Irrigated Agriculture
and Water Management Investment
Programme (OIIAWMIP)- Tranche-II
Orissa New-
ERM
471.43 (PL
2010-11)
79863
1347 113th 12.01.2012 Rajgarh Medium Irrigation Project Rajastha
n
New-
Medium
192.13(PL
2010-11)
(irrigation-
140.46,
drinking
water supply-
51.46)
8568 21.09.2012
1348 113th 12.01.2012 Bank Protection Works from Ismailpur
to Bindtoli in downstream of Vikramshila
Bridge on the left bank of river Ganga in
Bhagalpur District.
Bihar Flood
Control
23.39 (PL
2011-12)
90215
(150000 nos)
26.06.2012
1349 113th 12.01.2012 Bagaha Town Protection Works Phase-I
on the left bank of river Gandak in west
Champaran District
Bihar Flood
Control
48.91(PL
2011-12)
4000 ( 100000
nos)
26.06.2012
1350 113th 12.01.2012 Flood Protection Works along left and
right banks of river Beas in Districts
Gurdaspur, Hoshiarpur and kapurthala.
Punjab Flood
Control
46.12 (PL
2009)
1800 (
225000)
22-05-2012
1351 113th 12.01.2012 Purna Barrage (Ner Dhamana)
Irrigation Project.(Revised)
Maharas
htra
Medium
Revised
617.46 (PL
2009-10)
7024 26.03.2012
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1352 114th 28.03.2012 Raising and Strengthening of Adhwara
and Khiroi left embankment from RD
0.0 Km to RD 43.60 Km & from RD
44.00 Km to RD 90.50 Km. and Right
embankment from RD 0.0 Km to RD
81.50 Km in Sitamarhi, Madhubani and
Darbhanga districts of Bihar.
Bihar New-
Flood
Control
167.03
(PL-2011)
141760 ha./
17,32,000 nos.
1353 114th 28.03.2012 "Improvement of embankment and
ancillary works in Kandi and other
adjoining areas of the districts of
Murshidabad"
West
Bengal
New-
Flood
Control
438.94
( PL-2011)
51000 ha./
5,00,000 nos.
13.06.2012
1354 114th 28.03.2012 Construction of Mahadewa- uska
embankment along right bank of river
Kunra in Siddharthnagar district of Uttar
Pradesh ( Scope
Change)
Uttar
Pradesh
Revised-
Flood
Control
27.76
(PL-2008-09)
1924 ha./
16184 nos.
1355 114th 28.03.2012 Construction of Balrampur-Bhadaria
embankment along right bank of river
Rapti in Balrampur district of Uttar
Pradesh
Uttar
Pradesh
Revised-
Flood
Control
25.61
(PL- 2008-
09)
14373 ha./
56000nos.
1356 115th 24.07.2012 Andhra Pradesh Irrigation and
Livelihood Improvement Project
Andhra
Pradesh
Major -
ERM
1131.136
(Pl 2010-11)
1,14,878
1357 115th 24.07.2012 Restoration of Western Gandak Canal
System, (Saran Main Canal &Its
Distribution System)
Bihar New -
Major -
ERM
2169.51
( PL -2011-
12)
4,78,000
1358 115th 24.07.2012 Minimata (Hasdeo) Bango Project Chhattis
garh
Major -
ERM
492.31
( PL- 2011-
12)
45,116
restoration
1359 115th 24.07.2012 Medium Irrigation Project to Nadaun
Area in Tahsil - Nadaun, District -
Hamirpur
Himacha
l
Pradesh
Medium -
New
97.59(PL-
Jun,2011)
6,471 25.03.2013
1360 115th 24.07.2012 Mahuar Medium Irrigation Project Madhya
Pradesh
New -
Medium
191.2707 (PL-
2009)
13,775
1361 115th 24.07.2012 Bilgaon Irrigation Project Madhya
Pradesh
New -
Medium
182.22 (PL-
2009)
12,285 14.12.2012
1362 115th 24.07.2012 Thoubal Multipurpose Project Manipur Revised -
Major
1387.85 (PL-
2011)
33,38712.09.2012
1363 115th 24.07.2012 Khuga Multipurpose Project Manipur Revised-
Medium
433.91 (
PL-2011)
14,75519.09.2012
1364 115th 24.07.2012 Dolaithabi Barrage Project Manipur Revised-
Medium
360.05 (PL-
2011)
7,54520.09.2012
1365 115th 24.07.2012 Imphal Barrage Project Manipur ERM-
Medium
16.8 (PL-
2011)
6,400
1366 115th 24.07.2012 Sekmal Barrage Project Manipur ERM-
Medium
10.2 (PL-
2011)
8,500
1367 115th 24.07.2012 Revised Estimate of Rehabilitation of
1st Patiala Feeder & Kotla Branch with
20% enhanced capacity and changed
value of "N"
Punjab Revised-
Major
199.39(PL-
2011-12)
3,34,109
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1368 115th 24.07.2012 Construction of Lining of Tumaria-
Bahalla & Naktiya Feeder
Uttarkhand ERM-
Medium
11.2
(PL-2010-11)
7,890
restoaration
2,54 and
Add.creation1
0 ha
14.12.2012
1369 116th 14.12.2012 Anti erosion works from km 0.650 of
Retired bund -1 of Sakraur Bhikharipur
Ring bund to km 13.600 of Main bund
of Sakraur Bhikharipur along left bank
of river Sarayu/Ghaghra in Gonda
district
Uttar
Pradesh
Flood
Control .
41.51(PL-
2010)
2675 ha,
Population
18430
1370 116th 14.12.2012 Construction of Marginal Embankment
upstream of Elgin bridge along right
bank of river Ghaghra in the district of
Barabanki
Uttar
Pradesh
Flood
Control .
170.08(PL-
2010)
44,250 ha,
Population
334680
1371 116th 14.12.2012 Flood protection works along left benk
of river Ghaghra in the disrict of Basti
Uttar
Pradesh
Flood
Control .
80.24(PL-
2010)
24743 ha,
Population
496480
1372 116th 14.12.2012 ERM of Malan Canal System Uttarakh
and
ERM-
Medium
11.40
( PL-2010-
11)
3984 ha
(Restoration
753 ha
and Additional
creation 41
ha)
1373 116th 14.12.2012 Lakhwar Multipurpose project Uttarakh
and
Multipurp
ose
3966.51
(PL- 2012)
33,780
1374 117th 21.03.2013 Protection of Brahmaputra dyke from
Sissikalghar to Tekeliphuta at different
reaches from Lotasur to Tekeliphuta
from the erosion of river Brahmaputra
(review)
Assam Flood
control
155.87 (PL
2011-12) Area
protected =
10117 ha &
Population
5,00,000
1375 117th 21.03.2013 Delija Dewada Medium Irrigation project Madhya
Pradesh
NEW
Medium -
ERM
17.49 (PL
2009)
7200
(Restoration
3600)
1376 117th 21.03.2013 Anandapur Barrage project (Phase -II )
of Odisha (Integrated Anandapur
Barrage Project)
Orissa Major -
Revised
1457.63 (PL
2010-11)
56,720
1377 117th 21.03.2013 Salandi Sanskar Project of Odisha
(Integrated Anandapur Barrage
Project).
Orissa Major -
Revised
145.77 (PL
2010-11)
Annual
irrigan=7822
ha, Area
protected =
250000 ha &
Population
13,50,000
1378 117th 21.03.2013 Madhya Ganga Canal project Stage
-II
Uttar
Pradesh
Major -
Revised
2865.11 (PL
2011)
1,46,532 21.06.2013
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1379 117th 21.03.2013
River Training works (Marginal Bunds &
Studs) for protection of population and
Agriculture Land , situated along both
banks of River Solani of villages
Rampur , Ibrhimpur , Solanipuram,
Jamalpur etc in district Haridwar.
Uttarakh
and
Flood
control
33.19
(PL 2012-
13.)
Area
protected =
475 ha &
Population
40,000
1380 118th 30.07.2013 Scheme for Extension of Embankment
from Manoubar to Phuhia with
protection work at vulnerable points and
brick Soling Road on top of
embankment in between 96.50 km to
110.48 km of Right Kamla Balan
embankment in Darbhanga, Saharsa
and Samastipur Districts in Bihar.
Bihar Flood
control
56.65 (PL-
Oct,2012)
Area
protected =
0.46 lakh &
Population
225000
18.11.2013
1381 118th 30.07.2013 Bagmati Flood Management Scheme
Phase-IV (a)
Bihar Flood
control
73.45 (PL-
Oct,2012)
Area
protected =
4.39 lakh &
Population
340000
18.11.2013
1382 118th 30.07.2013 Anti-Erosion work for Restoration of
Spur No.2,3,4,5 & 7: Boulder
Revetment at toe of embankment in
upstream and downstream of Spur No.6
in a length of 800m with 4 Nos.
additional Spur in Ismailpur - Bindtoli
Embankment on left bank of river
Ganga.
Bihar Flood
control
38.83 (PL-
Oct,2012)
Area
protected =
42428 ha. &
Population
200000
18.11.2013
1383 118th 30.07.2013 Bagaha Town Protection scheme
(Phase-II) on the left bank of river
Gandak in West Champaran district of
Bihar
Bihar Flood
control
59.46 (PL-
Oct,2012)
Area
protected =
2500 ha. &
Population
100000
18.11.2013
1384 118th 30.07.2013 Project for construction of studs and
marginal bund for protection of
population and agricultural land of
villages situated at Banks of river
Ganga in District Haridwar
Uttarakh
and
Flood
control
34.85
(PL-2012-13)
Area
protected =
4344 ha. &
Population
12360
07.08.2013
Planning
Commission
has
approved for
Rs.33.19 Cr.
1385 118th 30.07.2013 Swan River Flood Management Project
from Daulatpur bridge to Gagret bridge
in main Swan river & all tributories
joining main Swan river from Gagret
bridge to Santokhgarh bridge
Himacha
l
Pradesh
Flood
control
922.485 (PL-
March,2013)
Area
protected =
7163.49 ha. &
Population
235834
20.09.2013
1386 118th 30.07.2013 Project for Channelisation of
Chhounchh Khad in Tehsil Indora,
District Kangra, Himachal Pradesh
Himacha
l
Pradesh
Flood
control
179.59 (PL-
March,2013)
Area
protected =
1740.30 ha. &
Population
8175
14.10.2013
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1387 118th 30.07.2013 Flood Management of River Dikrong
along with river training works on both
banks Embankment in Lakhimpur
Districts of Assam.
Assam Flood
control
105.96 (PL-
2011-12)
Area
protected =
9998 ha. &
Population
210700
1388 118th 30.07.2013 Flood Management of river Ranganadi
along with River Training works on both
bank embankments in Lakhimpur
District (Assam)
Assam Flood
control
361.42
(PL-2011-12)
Area
protected =
21056 ha. &
Population
398275
1389 119th 29.08.2013 Flood Protection works to be executed
along Indo Pak border on river Ravi &
it's tributary Ujh, to check land erosion
for the safety of village Abadies, border
fencing and other defense installations
Punjab Flood
control
161.05 (PL-
Dec,2011)
Area
protected =
55597 ha. &
Population
18000
07.10.2013
1390 119th 29.08.2013 Dhansiri Irrigation Project Assam Major -
Revised
567.05
(PL-2011-12)
83366
1391 119th 29.08.2013 Singda Multipurpose Project Manipur Medium-
ERM
34.62
(PL-2011-12)
3000 10.12.2013
1392 119th 29.08.2013 Lift Canal system of Upper Indravati
Irrigation Project
odisha Major -
New
986.71
(PL-2012-13)
43047
1393 119th 29.08.2013 Lower Indra Irrigation Project odisha Major -
Revised
1624.49
(PL-2012-13)
38870
1394 119th 29.08.2013 Ret Medium Irrigation Project odisha Medium -
Revised
433.39
(PL-2012)
9775
1395 120th 13.09.2013 Proposed Flood Protection works along
left bank of river Yamuna in district
Baghpat and Ghaziabad
Uttar PradeshFlood
control
44.89
(PL-
Nov,2012)
Area
protected =
5600 ha. &
Population
120000
08.11.2013
1396 120th 13.09.2013 Anti-Erosion Work along the bank of
river Haura for protection of vulnerable
locations from Chapaknagr to Baldakhal
under Sadar Sub-Division of West
Tripura District
Tripura Flood
control
42.96
(PL-2011)
Area
protected =
1959 ha. &
Population
18337
1397 120th 13.09.2013 Parwan Irrigation cum drinking water
supply scheme
RajasthanMajor -
New
2435.93
(PL-2011-12)
99864
1398 121st 08.10.2013 ERM of Narayanpur Left Bank Canal
System, Karnataka
Karnata
ka
Major-
ERM
3752.18
(2012-13)
408703
(Restoration
142580)
1399 121st 08.10.2013 Upper Tunga Project Karnata
ka
Major-
New
2561.88
(2012-13)
94,698
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1400 121st 08.10.2013 Anti- Erosion Work along the bank of
river Khowai for protection of vulnerable
locations from Netajinagar (Brahma
Cherra) to Banglahour under Teliamura
Sub Division and from South L.N.Pur to
Paharmura Bridge under Khowai Sub
Division of West Tripura District.
Tripura Flood
control
91.02
(2011)
Area
protected =
4256 ha. &
Population
38693
1401 121st 08.10.2013 Anti- Erosion Work along the bank of
river Gumti for protection of vulnerable
locations from Dalak Samatal Para to
Durgapur under Amarpur, Udaipur and
Sonamura Sub Division of South
Tripura & West Tripura District
Tripura Flood
control
54.99
(2011)
Area
protected =
2209 ha. &
Population
25326
1402 122nd 20.12.2013 Rukura Medium Irrigation Project Odisha Medium-
Revised
256.09
(2013)
5,750
1403 122nd 20.12.2013 Loktak Lift Irrigation Scheme Manipur Major-
ERM
25.56
(2011)
24000
(Restoration
12600)
1404 122nd 20.12.13 Mahi Irrigation Project Madhya
Pradesh
Major-
Revised
834.24
(2009)
28,127
1405 123rd 30.01.2014 Karanja Irrigation Project Karnata
ka
Major-
Revised
635.18
(2012-13)
29,227
1406 123rd 30.01.2014 Kanupur Irrigation Project Odisha Major-
Revised
1801.25
(2013)
47,709
1407 123rd 30.01.2014 Rengali Irrigation Sub Project -Right
Bank Canal
Odisha Major-
Revised
1962.33
(2013)
1,43,490
1408 123rd 30.01.2014 Subarnarekha Irrigation Project Odisha Major-
Revised
5561.57
(2013-14)
1,87,462
1409 123rd 30.01.2014 Thoubal Multipurpose Project Manipur Major-
Revised
1694.27
(2011)
35,160
26.02.2014
1410 123rd 30.01.2014 Flood Protection Scheme to Protect
Villages, Canals and Roads from River
Koshi in Betal ghat Block, District
Nainital
Uttarakh
and
Flood
Control
31.21
(2011-12)
500 ha,
Population-
10,000
21.03.2014
1411 123rd 30.01.2014
Project for Flood Protection Work along
River Song and its Tributaries from D/S
of the Confluence of River Jakhan and
River Song upto Ganga river in Doiwala
Block of District Dehradun
Uttarakh
and
Flood
Control
34.26
(2012-13)
181.3 ha,
Population-
4725
1412 123rd 30.01.2014 Project Report for River Jakhan from
village Rani Pokhari to Confluence with
Song River in Doiwala Block of District
Dehradun
Uttarakh
and
Flood
Control
33.95
(2012-13)
229.50 ha,
Population-
4725
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1413 123rd 30.01.2014 Flood Protection Work of Bindal River
from Cantt. Road to Mothronwala in
District Dehradun
Uttarakh
and
Flood
Control
46.4216
(2012-13)
57.55 ha,
Population-
25,000
1414 123rd 30.01.2014 Project for Flood Protection Work along
Suswa River in Doiwala Block of District
Dehradun
Uttarakh
and
Flood
Control
98.00
(2012-13)
1865 ha,
People-40,000
1415 123rd 30.01.2014 Karnataka Integrated and sustainable
Water Resources Management
Investment Program (KISWRMIP),
Tranche-1
Karnata
ka
Medium
ERM
118.75
(2012-13)
7,500
1416 124th 16.10.2014 Integrated Flood and River Bank
Erosion Management Works at
Rohmoria
Assam Flood
Control
78.48 (2013-
14)
36000
Population -
1,80,000
1417 124th 16.10.2014 Bagaha town protection works (Phase-I)
on the left bank of river Gandak in West
Champaran District
Bihar Flood
Control
90.78 (2013-
14)
4000
Population -
1,00,000
1418 124th 16.10.2014 Bagaha Town Protection Scheme
(Phase-III) on the left bank of river
Gandak in West Champaran district
Bihar Flood
Control
75.71 (2012) 2500
Population -
1,00,000
1419 124th 16.10.2014 Modernisation of Thannermukkom
Barrage
Kerala Flood
Control
255.34
(2012)
55874.38
Population -
14,00,000
1420 124th 16.10.2014 Kachhal Irrigation Project Madhya
Pradesh
Revised-
Medium
91.39 (2009) 3,470
1421 124th 16.10.2014 Telengiri Irrigation Project Odisha Medium-
Revised
613.71
(2013)
13,829
1422 124th 16.10.2014 Rengali Irrigation sub-project LBC-II
(RD 29.177 Km to 141.00 Km)
Odisha Major-
Revised
3603.67
(2013)
177651
1423 124th 16.10.2014 Kanhar Irrigation Project Uttar
Pradesh
Major-
Revised
2252.29(201
3-14)
35467
1424 124th 16.10.2014 Project for construction of Marginal
bund in Ramraj Khadar along right bank
of river Ganga in the District of
Muzaffarnagar
Uttar
Pradesh
Flood
Control
29.39
(2012) 7500
Population-
40,000
1425 124th 16.10.2014 Protection Work on both bank of
Bhagirathi river at Uttarkashi in District
Uttarkashi
Uttarkha
nd
Flood
Control
48.814
(2013)
13.50
105 Houses
1426 124th 16.10.2014 River Training Works including
miscellaneous associated works on
both banks of Bhagirathi river as per
requirement from Jhulapul to Tioth
bridge execluding proposed works on
left from Tiloth bridge to Switchyard of
Maneri Bhali-I at Uttarkashi
Uttarkha
nd
Flood
Control
76.71 (2013) 37.50
165 Houses
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1427 124th 16.10.2014 Project for construction of Studs and
Marginal Bund for protection of
population and agricultural land from
Banjarewala to Alawalpur villages
situated at banks of River Solani in
Distt. Haridwar,
Uttarkha
nd
Flood
Control
38.898
(2014)
707
Population-
23068
1428 124th 16.10.2014 Flood Protection Scheme of Villages
from Dakpathar Barrage to NH-72
Kulhal Paonta Sahib Bridge from River
Yamuna (Left Bank) in Vikasnagar
Block Distt. Dehradun,
Uttarkha
nd
Flood
Control
77.349
(2014)
400
Population
protected
10850
1429 124th 16.10.2014 Project for Anti-Erosion & drainage work
of Udmadi Rao Nala from Village-Kheda
Pachhawa to Village-Fatehpur (Aasan
River) in Vikasnagar Block Distt.-
Dehradun,
Uttarkha
nd
Flood
Control
34.05 (2014) 270
Population
Protected
2200
1430 124th 16.10.2014 Project for Flood Protection Works from
Hilly Shivalik Range Originated Nalas
(Between Villages Sekhuwala to
Prateetpur) in Vikasnagar Block Distt.-
Dehradun,
Uttarkha
nd
Flood
Control
31.25 (2014) 178
Population
Protected
20000
1431 124th 16.10.2014 Scheme for Flood protection of the
villages from River Asaan (Between
Sahaspur-Sabhawala Bridge to Kunja
Grant) in Vikasnagar Block, Distt-
Dehradun,
Uttarkha
nd
Flood
Control
57.74 (2014) 220
Population
Protected
1850
1432 125th 25.05.2015 Borolia Irrigation Project Assam Medium-
Revised
Cost
157.03
(PL 2013)
13562
1433 125th 25.05.2015 Modernisation of Tunga Anicut Canal
Network
Karnata
ka
ERM,
Medium
239.75 (PL
2012-13)
11732
1434 125th 25.05.2015 Modernisation of canal system of
Bhadra reservoir Project
Karnata
ka
ERM,
Major,
Revised
1175.79
(PL 2014)
177337
1435 125th 25.05.2015 Sonthi Lift Irrigation Scheme Karnata
ka
Major 673.9
(PL 2013-14)
16800
1436 125th 25.05.2015 ERM of Rajghat Canal Project Madhya
Pradesh
ERM,
Major,
Revised
56.83
(PL 2014-15)
164789
1437 125th 25.05.2015 Dolaithabi Barrage Project Manipur Medium
Irrigation,
Revised
509.70 Cr.
(PL 2013)
7545
1438 125th 25.05.2015 Anti-erosion work near Khairpur,
Raghopur, Akidatpur and Shankarpur
villages on the left bank of river Ganga.
Restoration of spur and maintanence of
service road and approach road.
Bihar Flood
Control
70.68
(PL 2012)
Area
Protected=182
85.714
Population
protected = 1439 125th 25.05.2015 Channelisation of River Pabbar from
Tikkari to Hatkoti, Tahsil Rorhu, Distt.
Shimla
Himacha
l
Pradesh
Flood
Control
190.82
(PL 2014)
Area
Protected -
177
Houses
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1440 125th 25.05.2015 Swan River Flood Management Project
Downstream of Santokhgarh Bridge
Upto H.P –Punjab Boundary
Himacha
l
Pradesh
Flood
Control
46.8
(PL 2013-14)
Area
Protected -
477.5
Population
Benefitted- 1441 125th 25.05.2015 Project Report for priority works-
Comprehensive plan for Flood
management works on Jhelum, Phase-I
Jammu
&
Kashmir
Flood
Control
399.29
(PL 2014)
Area
Protected -
33613
Population
Benefitted-
1442 125th 25.05.2015 Project for construction of Aile Persauli
Lolpur bund on the left bank of river
Ghagra/ Saryu in Gonda district of Uttar
Pradesh
Uttar
Pradesh
Flood
Control
43.55
(PL 2014)
Area
Benefitted -
32815.74
Population
Benefitted-
112410
1443 125th 25.05.2015 Phase-I works of Ghatal Master Plan in
Paschim Medinipur and Purba
Medinipur districts of West Bengal
West
Bengal
Flood
Control
1214.92
(PL 2013-14)
Area
Benefitted -
65700
(Approx.)
Population
Benefitted-
8,74,000
1444 126th 16.07.2015 Formation of Flood Carrier Canal from
Kannadian Channel to drought prone
area of Sathankulam, Thisaiyanvilay by
interlinking Tamirabarani, Karumediyar
and Nambiyar Rivers in Tirunelveli and
Thoothukudi Districts, Tamil Nadu
Tamil
Nadu
Major
Irrigation
872.45 Cr.
(PL 2014-15)
23040
1445 126th 16.07.2015 Revised detailed project report for
construction of embankments along
river Jhim and Jamura (Adhwara
Group) from Sonbarsa Bajar to
Sonbarsa village in Sitamarhi District,
Bihar.
Bihar Flood
Control
134.20 Cr.
(PL 2013-14)
Area
protected =
17400 ha. &
Population
5.26 lakh
1446 126th 16.07.2015 Revised Bagmati Flood Management
Scheme Phase-II
Bihar Flood
Control
1283.50 Cr.
(PL 2012)
Area
protected =
3.13 lakh ha.
& Population
123.85 lakh
1447 126th 16.07.2015 Bagmati Flood Management Scheme
Phase-III (a)
Bihar Flood
Control
912.45 Cr.
(PL 2013-14)
Area
protected =
2.90 lakh ha.
& Population
12 lakh
1448 127th 13.11.2015 Anti-erosion work on the right bank of
the Ganga river from Rafatola to
Srighar 10 Nos. in Sahibganj District
Jharkha
nd
Flood
Control
52.63 cr. Area protected
= 3700 ha
Population
Benefitted =
85,000
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1449 127th 13.11.2015 Revised Cost Estimate of Extension,
Renovation and Modernisation of
canals being fed from river Sutlej
Punjab Major -
ERM,
Revised
Cost
918.25
(PL 2013-14)
207068
1450 127th 13.11.2015 Revised Cost Estimate of Relining of
Sirhind Feeder from RD 119700 to
447927, Punjab
Punjab Major -
ERM,
Revised
Cost
671.478
(PL 2015)
69086
1451 127th 13.11.2015 Revised Cost Estimate of Relining of
Rajasthan Feeder from RD 179000 to
496000, Punjab
Punjab Major -
ERM,
Revised
Cost
1305.267
(PL 2015)
98739
1452 128th 29.02.2016 Jigaon Irrigation Project Maharas
htra
New,
Major
5708.11 (PL
2014-15)
101088
1453 128th 29.02.2016 Indiramma Flood Flow Canal Project Telanga
na
Revised -
Major
5940.09 (PL
2015-16)
93587
1454 128th 29.02.2016 Sulwade Jamphal Kanoli Lift Irrigation
Scheme
Maharas
htra
New -
Major
2374.46 Cr.
(PL 2014-15)
52720
1455 128th 29.02.2016 Scheme for protection of Haha Nala
Bund, Chainpur Gulaura pump canal &
Shiv Mandir at village Chainpur Gulaura
between 0.800Km to 2.400 Km of Haha
Nala bund, Protection of village group
Sangapur, Gorauli, Kakarghatta
between 39.800 Km to 41.600 Km of
Turtipar-Shrinagar bund & protection of
Bakulaha Sansar Tola bund and village
group of Ibrahimabad Naubrar between
4.800 Km to 5.175 of B.S.T. bund on
right bank of river Ghaghra in district
Ballia of Uttar Pradesh
Uttar
Pradesh
Flood
Control
47.3882 Cr
(PL 2013)
Area protected
= 11120 ha
Population
Benefitted =
89870
1456 128th 29.02.2016 Scheme for construction of Bairiya
Sarya Bund on right bank of River-Rapti
in the district-Gorakhpur of Uttar
Pradesh.
Uttar
Pradesh
Flood
Control
75.8219 Cr
(PL 2013)
Area protected
= 9640.5 ha
Population
Benefitted =
30000
1457 128th 29.02.2016 Scheme for construction of
Embankment from village Joulpur to
Patwayee (From 0.000 Km to 28.500
Km) on left Bank of River Kosi in
Rampur district, Uttar Pradesh.
Uttar
Pradesh
Flood
Control
66.63 Cr (PL
2013-14)
Area protected
= 9970 ha
Population
Benefitted =
40700
1458 128th 29.02.2016 Scheme for protection of Gaura-
Saifabad embankment between Km.
3.000 to 4.400 on left bank of River-
Ghaghra in the district - Basti of Uttar
Pradesh
Uttar
Pradesh
Flood
Control
33.9885 Cr
(PL 2012)
Area protected
= 6435 ha
Population
Benefitted =
130000
Sl. Meet
ing
Num
ber
Date of
Meeting
Project Name Name
of the
State
Major/
Medium
Estimated
Cost in
crore
Benefits in
ha
Date of
Approval
by
Planning
Commissio
n1459 128th 29.02.2016 Scheme for construction of 7nos. Spurs
at Km. 12.500, 13.200, 14.200, 15.100,
15.750, 16.200 & 16.600 of Kalwari-
Rampur Bund on left bank of river
Ghaghra in the district-Basti, Uttar
Pradesh
Uttar
Pradesh
Flood
Control
29.5997 Cr
(PL 2012)
Area protected
= 15850 ha
Population
Benefitted =
180000