list of projects considered and accepted - Central Water ...

148
Sl. Meet ing Num ber Date of Meeting Project Name Name of the State Major/ Medium Estimated Cost in crore Benefits in ha Date of Approval by Planning Commissio n 1. 1 st 18.12.1976 Upper Indravati Project (MULTI PURPOSE) Orissa Major 77.66 185830 03.05.1978 2. 1 st 18.12.1976 Singda Dam Multi-purpose Project Manipur Medium 7.93 4148 28.02.1977 3. 1 st 18.12.1976 Banjar River Project Madhya Pradesh Medium 2.09 2428 03.02.1977 4. 1 st 18.12.1976 Chaskaman Irrgation Project Maharas htra Major 22.48 17.02.1977 5. 1 st 18.12.1976 Bateshwarsthan Pump Canal Phase-I Bihar Major 13.877 25749 25.01.1977 6. 1 st 18.12.1976 Upper Pravara Project near Mhaladevi Maharas htra Major 15.868 19537 17.02.1977 7. 1 st 18.12.1976 Suheli Irrigation Scheme Uttar Pradesh Major 6.4 17493 16.02.1977 8. 1 st 18.12.1976 Sukhi Project Gujarat Major 23.11 21246 1.021977 9. 1 st 18.12.1976 Thumblahalli Reservoir Scheme Tamil Nadu Medium 1.02 1282 08.02.1977 10. 1 st 18.12.1976 Pambar Reservoir Scheme Tamil Nadu Medium 1.6 1618 08.02.1977 11. 1 st 18.12.1976 Kerwan Tank Project Madhya Pradesh Medium 1.033 4047 16.02.1977 12. 1 st 18.12.1976 Kothapally Lift Irrigation Scheme on River Krishna Andhra Pradesh Medium 2 4046 09.02.1977 13. 1 st 18.12.1976 Krishnapuram Reservoir Scheme Andhra Pradesh Medium 1.28 2480 14. 1 st 18.12.1976 Bijna Tank Project Madhya Pradesh Medium 1.206 2145 16.02.1977 15. 1 st 18.12.1976 Godhatad Irrigation Gujarat Medium 0.478 780 02.02.1977 16. 1 st 18.12.1976 Rajawal Irrigation Gujarat Medium 2.53 3278 03.02.1977 17. 1 st 18.12.1976 Amipur Irrigation Scheme Gujarat Medium 2.79 6775 03.02.1977 18. 1 st 18.12.1976 Sukhbhadar irrigation Scheme Gujarat Medium 2.26 6858 03.02.1977 19. 1 st 18.12.1976 Peddavagu Reservoir Scheme Andhra Pradesh Medium 3.756 6474 07.02.1977 20. 1 st 18.12.1976 Mukkamamidi Project Andhra Pradesh Medium 0.475 931 07.02.1977 21. 1 st 18.12.1976 Beggulavagu Project Andhra Pradesh Medium 1.363 2085 07.02.1977 22. 1 st 18.12.1976 Jurala Lift Irrigation Scheme on River Krishna Andhra Pradesh Medium 2024 17.02.1977 23. 1 st 18.12.1976 Maddigeda Reservoir Andhra Pradesh Medium 1.553 1822 16.02.1977 24. 1 st 18.12.1976 Taliparu Project Andhra Pradesh Medium 9.06 13965 23.03.1978 25. 1 st 18.12.1976 Pedda Ankalam RegulatorScheme Andhra Pradesh Medium 1.028 3518 19.09.1979 26. 1 st 18.12.1976 Pedderu Reservoir Scheme Andhra Pradesh Medium 1.5 1011 23.02.1977 LIST OF PROJECTS CONSIDERED AND ACCEPTED BY TECHNICAL ADVISORY COMMITTEE

Transcript of list of projects considered and accepted - Central Water ...

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1.      1

st 18.12.1976 Upper Indravati Project (MULTI

PURPOSE)

Orissa Major 77.66 185830 03.05.1978

2.      1st 18.12.1976 Singda Dam Multi-purpose Project Manipur Medium 7.93 4148 28.02.1977

3.      1st 18.12.1976 Banjar River Project Madhya

Pradesh

Medium 2.09 2428 03.02.1977

4.      1st 18.12.1976 Chaskaman Irrgation Project Maharas

htra

Major 22.48 17.02.1977

5.      1st 18.12.1976 Bateshwarsthan Pump Canal Phase-I Bihar Major 13.877 25749 25.01.1977

6.      1st 18.12.1976 Upper Pravara Project near Mhaladevi Maharas

htra

Major 15.868 19537 17.02.1977

7.      1st 18.12.1976 Suheli Irrigation Scheme Uttar

Pradesh

Major 6.4 17493 16.02.1977

8.      1st 18.12.1976 Sukhi Project Gujarat Major 23.11 21246 1.021977

9.      1st 18.12.1976 Thumblahalli Reservoir Scheme Tamil

Nadu

Medium 1.02 1282 08.02.1977

10.   1st 18.12.1976 Pambar Reservoir Scheme Tamil

Nadu

Medium 1.6 1618 08.02.1977

11.   1st 18.12.1976 Kerwan Tank Project Madhya

Pradesh

Medium 1.033 4047 16.02.1977

12.   1st 18.12.1976 Kothapally Lift Irrigation Scheme on

River Krishna

Andhra

Pradesh

Medium 2 4046 09.02.1977

13.   1st 18.12.1976 Krishnapuram Reservoir Scheme Andhra

Pradesh

Medium 1.28 2480

14.   1st 18.12.1976 Bijna Tank Project Madhya

Pradesh

Medium 1.206 2145 16.02.1977

15.   1st 18.12.1976 Godhatad Irrigation Gujarat Medium 0.478 780 02.02.1977

16.   1st 18.12.1976 Rajawal Irrigation Gujarat Medium 2.53 3278 03.02.1977

17.   1st 18.12.1976 Amipur Irrigation Scheme Gujarat Medium 2.79 6775 03.02.1977

18.   1st 18.12.1976 Sukhbhadar irrigation Scheme Gujarat Medium 2.26 6858 03.02.1977

19.   1st 18.12.1976 Peddavagu Reservoir Scheme Andhra

Pradesh

Medium 3.756 6474 07.02.1977

20.   1st 18.12.1976 Mukkamamidi Project Andhra

Pradesh

Medium 0.475 931 07.02.1977

21.   1st 18.12.1976 Beggulavagu Project Andhra

Pradesh

Medium 1.363 2085 07.02.1977

22.   1st 18.12.1976 Jurala Lift Irrigation Scheme on River

Krishna

Andhra

Pradesh

Medium 2024 17.02.1977

23.   1st 18.12.1976 Maddigeda Reservoir Andhra

Pradesh

Medium 1.553 1822 16.02.1977

24.   1st 18.12.1976 Taliparu Project Andhra

Pradesh

Medium 9.06 13965 23.03.1978

25.   1st 18.12.1976 Pedda Ankalam RegulatorScheme Andhra

Pradesh

Medium 1.028 3518 19.09.1979

26.   1st 18.12.1976 Pedderu Reservoir Scheme Andhra

Pradesh

Medium 1.5 1011 23.02.1977

LIST OF PROJECTS CONSIDERED AND ACCEPTED

BY TECHNICAL ADVISORY COMMITTEE

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n27.   1

st 18.12.1976 Jalleru Reservoir Scheme Andhra

Pradesh

Medium 2.186 2125 23.02.1977

28.   1st 18.12.1976 Raiwada Reservoir Scheme Andhra

Pradesh

Medium 8.88 8638 23.02.1977

29.   1st 18.12.1976 Suvwarmukid gomukhi Reservoir

Scheme

Andhra

Pradesh

Medium 8 8014 23.02.1977

30.   1st 18.12.1976 Anjanem Irrigation Project Goa Medium 3.6815 4830 22.02.1977

31.   1st 18.12.1976 Kalisagar Project Maharas

htra &

Madhya

Medium 3.225/2.42 4800 08.02.1977

32.   1st 18.12.1976 Vattivagu Scheme Andhra

Pradesh

Medium 5.4 9918 07.02.1977

33.   1st 18.12.1976 Mallurvagu Scheme Andhra

Pradesh

Medium 15.18 3039 07.02.1977

34.   1st 18.12.1976 Konam Reservoir Scheme Andhra

Pradesh

Medium 1.48 4007 07.02.1977

35.   1st 18.12.1976 Paronen Tank Project Madhya

Pradesh

Medium 1.09 2347 16.02.1977

36.   1st 18.12.1976 Mandohol Irrigation Scheme Maharas

htra

Medium 1.87 2606 19.03.1977

37.   1st 18.12.1976 Marhi Tank Project Madhya

Pradesh

Medium 1.465 607 16.02.1977

38.   1st 18.12.1976 Bisandha Tank Project Madhya

Pradesh

Medium 0.68 1048 08.02.1977

1.261 1265 16.02.197751.   1st 18.12.1976 Johilla Reservoir Project Madhya

Pradesh

Medium

50.   1st 18.12.1976 Mansurwari Tank Project Madhya

Pradesh

Medium 1.491 1802 16.02.1977

49.   1st 18.12.1976 Kachan Dam Project Madhya

Pradesh

Medium 2.1 3845 08.02.1977

0.655 943 08.02.1977

48.   1st 18.12.1976 Mahroi Tank Project Madhya

Pradesh

Medium 0.383

47.   1st 18.12.1976 Sonkhedsi Tank Project Madhya

Pradesh

Medium

607 16.02.1977

46.   1st 18.12.1976 Umrar Tank Project Madhya

Pradesh

Medium 19.15 2429 16.02.1977

45.   1st 18.12.1976 Talasara Irrigation Project Orissa Medium 2.173 2545 02.02.1977

1366

43.   1st 18.12.1976 Sarapgarh Irrigation Project Orissa Medium 1934

02.02.197744.   1st 18.12.1976 Jharbandha Irrigation project Orissa Medium 0.63

02.02.19771.146

0.505 5666 08.02.1977

42.   1st 18.12.1976 Soni Irrigation Project Gujarat Medium 1.824

41.   1st 18.12.1976 Baramandal Tank Project Madhya

Pradesh

Medium

02.02.19773240

40.   1st 18.12.1976 Gulabpura Tank Project Madhya

Pradesh

Medium 0.508 566 08.02.1977

39.   1st 18.12.1976 Modsagar Tank Project Madhya

Pradesh

Medium 0.964 1272 08.02.1977

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n

59.   1st 18.12.1976 Dhoba P.C. Scheme Uttar

Pradesh

Medium 0.75 4050 16.02.1977

60.   1st 18.12.1976 Shiva Canal Project Jammu

&

Medium 0.67 1011 15.02.1977

61.   1st 18.12.1976 Jammu

&

Medium 0.4 607 15.02.1977

62.   1st 18.12.1976 Chulki Nala Project Karnatak

a

Medium 37.976 4047 07.02.1977

63.   1st 18.12.1976 R.E of Nowi Basin Drainage Scheme West

Bengal

Flood

control

28.15

64.   1st 18.12.1976 Patna Flood Protection Scheme Bihar Flood

control

0.177

65.   2nd 28.04.1977 Karjan Project Gujarat Major 37.2 61973 18.05.1977

66.   2nd 28.04.1977 Lower Dudhana Project Maharas

htra

Major 22.3 29800

67.   2nd 28.04.1977 RE of Bhimsagar Irrigation Project Rajastha

n

Major 7.47 7900 12.03.1980

68.   2nd 28.04.1977 Palne Reservoir Scheme Bihar Medium 1.94 2368 08.02.1978

69.   2nd 28.04.1977 Jharjhia Reservoir Scheme Bihar Medium 4.46 5866 26.08.1977

70.   2nd 28.04.1977 Nakti Reservoir Scheme Bihar Medium 2.88 2315 20.02.1981

71.   2nd 28.04.1977 Kalubhar IrrigationScheme Gujarat Medium 3.13 3927 13.05.1977

72.   2nd 28.04.1977 Waghyanalla Tank Project Madhya

Pradesh

Medium 1.63 2308 24.05.1977

73.   2nd 28.04.1977 Jhirumnadi Diversion Scheme Madhya

Pradesh

Medium 0.39 2667 24.05.1977

74.   2nd 28.04.1977 NahlesarTank Project Madhya

Pradesh

Medium 1.96 4512 24.05.1977

75.   2nd 28.04.1977 RE of Patka Nalla Tank Project Madhya

Pradesh

Medium 0.68 1700 24.05.1977

76.   2nd 28.04.1977 Jarmora Tank Project Madhya

Pradesh

Medium 1.9 3030 24.05.1977

77.   2nd 28.04.1977 Chorborari Tank Madhya

Pradesh

Medium 0.64 829 04.06.1977

58.   1st 18.12.1976

56.   1st 18.12.1976 Umarhut Pump Canal Project Phase-I Uttar

Pradesh

Medium 0.778 3936

07.02.1977Karnatak

a

Medium 1.49 1417

17.02.1977

1.8 1133 07.02.1977Karnatak

a

Medium

Soudagar Tank Project

57.   1st 18.12.1976 Teetha Reservoir Project

55.   1st 18.12.1976 Kodumudiar Reservoir Scheme Tamil

Nadu

Medium 1.87 2509 08.02.1977

6.35 8010 05.04.1977

Bihar

54.   1st 18.12.1976 Bakhar Marihan Feeder Scheme Uttar

Pradesh

Medium

52.   1st 18.12.1976 Pandarwa Reservoir Scheme 31.03.1977

53.   1st 18.12.1976 Hirenalla Tank Project Medium

0.947 2068 16.02.1977

Karnatak

a

Medium 0.51 490

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n78.   2

nd 28.04.1977 Balar Reservoir Project Madhya

Pradesh

Medium 2.67 5567 24.05.1977

79.   2nd 28.04.1977 Matia Moti Nalla Project Madhya

Pradesh

Medium 1.61 4008 24.05.1977

80.   2nd 28.04.1977 Piparia Tank Project Madhya

Pradesh

Medium 3.89 6356 24.05.1977

81.   2nd 28.05.1977 Basapoawadi IrrigationScheme Maharas

htra

Medium 0.97 904 28.05.1977

82.   2nd 28.05.1977 Strengthening of Bhatghar Dam Maharas

htra

Medium 4.66 28.05.1977

83.   2nd 28.04.1977 Wabagai Barrage Project on Sekmai

River

Manipur Medium 2.59 8498 15.06.1977

84.   2nd 28.04.1977 Bondapipili Irrigation Project Orissa Medium 1.48 2250 27.06.1977

85.   2nd 28.04.1977 Kothari Irrigation Project Rajastha

n

Medium 2.35 4188 26.07.1977

86.   2nd 28.04.1977 Margia Irrigation Scheme Rajastha

n

Medium 0.59

87.   2nd 28.04.1977 Bardaha Dam Project Uttar

Pradesh

Medium 1.26 1255 20.05.1977

88.   2nd 28.04.1977 Urgent Development Works of

Sunderbans Area

West

Bengal

Flood

control

16.43

89.   3rd 26.08.1977 RE of Beas Unit-I Haryana,

Rajastha

n &

Major 382.57 16.03.1978

90.   3rd 26.08.1977 RE of Beas Unit- II Haryana

&

Major 259.8 1684227 23.01.1978

91.   3rd 26.08.1977 Hasdeo (Bango) Project Madhya

Pradesh

Major 115.3 327842 20.03.1980

92.   3rd 26.08.1977 RE of Gandak II Bihar Major 350.93 1299595 27.12.1977

93.   3rd 26.08.1977 RE of Rajasthan Canal Project Rajastha

n

Major 244.58

94.   3rd 26.08.1977 Haran Project Gujarat Major 25.26 36422 10.04.1978

95.   3rd 26.08.1977 Gundlavagu Project Andhra

Pradesh

Medium 1.16 1052 30.09.1977

96.   3rd 26.08.1977 Sathnala Project Andhra

Pradesh

Medium 3.21 7770 30.09.1977

97.   3rd 26.08.1977 Lohargarh Reservoir Scheme Bihar Medium 0.93 417 08.02.1978

98.   3rd 26.08.1977 Murahir Reservoir Scheme Bihar Medium 1.89 2104 12.10.1977

99.   3rd 26.08.1977 Nallur Amanikere Project Karnatak

a

Medium 1.90 1300 1977

100.   

         

 

3rd 26.08.1977 Kodar Reservoir Project Madhya

Pradesh

Medium 2.94 16188 26.09.1977

101.   

         

 

3rd 26.08.1977 Shamsherpura Tank Project Madhya

Pradesh

Medium 0.57 1065 26.09.1977

102.   

         

 

3rd 26.08.1977 Rampura Khurd Project Madhya

Pradesh

Medium 1.5 3318 26.09.1977

103.   

         

 

3rd 26.08.1977 Dholabaha Dam Project Punjab Medium 3.49 2261 27.09.1977

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n104.   

         

 

3rd 26.08.1977 Margia Irrigation Scheme Rajastha

n

Medium 0.59 9480

105.   

         

 

3rd 26.08.1977 Rohini Dam Project Uttar

Pradesh

Medium 0.7 1311 26.09.1977

106.   

         

 

4th 30.11.1977 Upper Indravati Project Multipurpose Orissa Major 77.66 185830 03.05.1978

107.   

         

 

4th 30.11.1977 Thein Dam Project Multipurpose Punjab

Rajastha

n J and

Major 263.16 348796 27.04.1982

108.   

         

 

4th 30.11.1977 Rangwan Canal Revised Madhya

Pradesh

Major 3.17 17085 09.02.1978

109.   

         

 

4th 30.11.1977 Revised Paralkote Dam Project Madhya

Pradesh

Major 5.27 14576 09.02.1978

110.   

         

 

4th 30.11.1977 Increase in capacity of Deokali Pumped

Canal Scheme

Uttar

Pradesh

Major 14.29 81200 06.03.1979

111.   

         

 

4th 30.11.1977 Urmil Dam Project Uttar

Pradesh

Major 8.56 4769 08.02.1978

112.   

         

 

4th 30.11.1977 Extension and Improvement of

Irrigation on Shah Nehar Canal System

Punjab Major 10.62 64187 02.02.1978

113.   

         

 

4th 30.11.1977 Bariarpur Left Bank Canal Project Madhya

Pradesh

Major 18.4 43850 09.03.1978

114.   

         

 

4th 30.11.1977 Jaipur Reservoir Scheme Bihar Medium 0.47 534 08.02.1978

115.   

         

 

4th 30.11.1977 Lorgara Reservoir Scheme Bihar Medium 0.55 417 08.02.1978

116.   

         

 

4th 30.11.1977 Palna Reservoir Scheme Bihar Medium 1.94 2368 08.02.1978

117.   

         

 

4th 30.11.1977 Sakrigali Pumped Canal Scheme Bihar Medium 0.61 2254 08.02.1978

118.   

         

 

4th 30.11.1977 Bateswarasthan Pumped Canal Scheme Bihar Medium 2.97 6590 08.02.1978

119.   

         

 

4th 30.11.1977 Fulzar II Irrigation Project Gujarat Medium 0.38 688 11.04.1978

120.   

         

 

4th 30.11.1977 Koil Lift Irrigation Scheme Jammu

&

Kashmir

Medium 2.38 3036 09.02.1978

121.   

         

 

4th 30.11.1977 Raipura (Tral) Lift Irrigation Scheme Jammu

&

Kashmir

Medium 2.13 2430 21.01.1979

122.   

         

 

4th 30.11.1977 Tral Lift Irrigation Scheme Jammu

&

Kashmir

Medium 6.12 6000 02.01.1979

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n123.   

         

 

4th 30.11.1977 Gandorinala Project Karnatak

a

Medium 7.71 8094 19.04.1978

124.   

         

 

4th 30.11.1977 Upper Hirenala Project Karnatak

a

Medium 1.91 1902 19.04.1978

125.   

         

 

4th 30.11.1977 Veerapur Tank Project Karnatak

a

Medium 3.85 4457 19.04.1978

126.   

         

 

4th 30.11.1977 Karapuzha Irrigation Project Kerala Medium 7.6 9300 19.04.1978

127.   

         

 

4th 30.11.1977 Attappady Irrigation Project Kerala Medium 8.42 8380

128.   

         

 

4th 30.11.1977 Chandrakeshar Dam Project Madhya

Pradesh

Medium 3.17 4800 21.02.1978

129.   

         

 

4th 30.11.1977 Amkoi Dam Project Madhya

Pradesh

Medium 0.6 613 21.02.1978

130.   

         

 

4th 30.11.1977 Naktara Dam Project Madhya

Pradesh

Medium 0.46 511 21.02.1978

131.   

         

 

4th 30.11.1977 Pendhari Nalla Project Maharas

htra

Medium 0.83 1836 09.02.1978

132.   

         

 

4th 30.11.1977 Dongargaon Project Maharas

htra

Medium 1.06 1244 09.02.1978

133.   

         

 

4th 30.11.1977 Pakadi Gudan Tank Project Maharas

htra

Medium 1.63 3229 09.02.1978

134.   

         

 

4th 30.11.1977 Kanota Irrigation Project Rajastha

n

Medium 0.81 1440 17.01.1978

135.   

         

 

4th 30.11.1977 Harai Reservoir Scheme West

Bengal

Medium 0.69

136.   

         

 

4th 30.11.1977 Sone Embankment Scheme Bihar Flood

control

2.59

137.   

         

 

4th 30.11.1977 Construction and Improvement of

Village Protection Works on the Right

Bank of River Gandak

U.P. &

Bihar

Flood

control

9.6

138.   

         

 

4th 30.11.1977 Ghea-Kunti Basin Drainage Scheme West

Bengal

Flood

control

7.59

139.   

         

 

4th 30.11.1977 Kunur River Embankment West

Bengal

Flood

control

4.01

140.   

         

 

5th 20.02.1978 Left Bank Ghagra Canal Uttar

Pradesh

Major 78.68

141.   

         

 

5th 20.02.1978 Upper Walhanga Project Wainganaga Madhya

Pradesh

Major 50.6 105200 09.08.1978

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n142.   

         

 

5th 20.02.1978 Upper Krishna Project Stage-I (RE) Karnatak

a

Major 283.65 458500 22.04.1978

143.   

         

 

5th 20.02.1978 Jhumka Nalla Tank Project Madhya

Pradesh

Medium 1.96 3000 23.04.1978

144.   

         

 

5th 20.02.1978 Mand Diversion Project Madhya

Pradesh

Medium 2.89 13100 27.03.1978

145.   

         

 

5th 20.02.1978 Bilaspur Diversion Project Madhya

Pradesh

Medium 0.95 5600 27.03.1978

146.   

         

 

5th 20.02.1978 Ghunghutta Shyam Diversion Project Madhya

Pradesh

Medium 1.98 13100 27.03.1978

147.   

         

 

5th 20.02.1978 Urmil Right Bank Canal Project Madhya

Pradesh

Medium 6.4 7700 27.03.1978

148.   

         

 

5th 20.02.1978 Dholawad Tank Project Madhya

Pradesh

Medium 4.68 6500 27.03.1978

149.   

         

 

5th 20.02.1978 Hiran-II Irrigation Project Gujarat Medium 4.48 4951 16.03.1978

150.   

         

 

5th 20.02.1978 Kabutari Irrigation Project Gujarat Medium 1.13 1753 16.03.1978

151.   

         

 

5th 20.02.1978 Mawal Lift Irrigation Scheme Jammu

&

Kashmir

Medium 4.32 11416 20.03.1978

152.   

         

 

5th 20.02.1978 Laster Valley Irrigation Scheme Uttar

Pradesh

Medium 1.14 628 31.03.1978

153.   

         

 

5th 20.02.1978 Gurma Nalla Project Madhya

Pradesh

Medium 2.31 22.01.1978

154.   

         

 

5th 20.02.1978 Amarja Project Karnatak

a

Medium 5.7 8930 13.03.1978

155.   

         

 

5th 20.02.1978 Upper Suktel Irrigation Project Orissa Medium 1.27 1519 21.03.1978

156.   

         

 

6th 14.03.1978 Rengali Irrigation Project (Phase-I) Orissa Major 233.64 423600 31.03.1978

157.   

         

 

6th 14.03.1978 Mahanadi Barrage Orissa Major 42.087 293138 11.04.1978

158.   

         

 

6th 14.03.1978 Taliperu Project Andhra

Pradesh

Medium 9.06 13965 23.03.1978

159.   

         

 

6th 14.03.1978 Anraj Reservoir Scheme Bihar Medium 2.64 4654 30.03.1978

160.   

         

 

6th 14.03.1978 Badua Upper Nala Reservoir Project Bihar Medium 0.9 554 30.03.1978

161.   

         

 

6th 14.03.1978 RE of Machhundri Irrigation Scheme Gujarat Medium 3.11 4466 11.04.1978

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n162.   

         

 

6th 14.03.1978 RE of Shingoda Irrigation Scheme Gujarat Medium 3 4132 11.04.1978

163.   

         

 

6th 14.03.1978 Bhabour Sahib Lift Irrigation Scheme Himacha

l

Pradesh

Medium 0.75 1200 30.03.1978

164.   

         

 

6th 14.03.1978 RE of Lethpora Lift Irrigation Scheme Jammu

&

Kashmir

Medium 2.77 3846 10.04.1978

165.   

         

 

6th 14.03.1978 Majhgaon Tank Project Madhya

Pradesh

Medium 0.94 1690 27.03.1978

166.   

         

 

6th 14.03.1978 Sahibkhedi Irrigation Project Madhya

Pradesh

Medium 1.03 1458 27.03.1978

167.   

         

 

6th 14.03.1978 Shivnath Diversion Project Madhya

Pradesh

Medium 0.59 2630 27.03.1978

168.   

         

 

6th 14.03.1978 Ankargaon Tank Project Maharas

htra

Medium 0.63 1504 28.03.1978

169.   

         

 

6th 14.03.1978 Hayiharajhor Irrigation Project Orissa Medium 7.25 12960 12.04.1978

170.   

         

 

6th 14.03.1978 Lining of Faridkot Distributary System

Scheme

Punjab Medium 0.8 1462 31.03.1978

171.   

         

 

6th 14.03.1978 Dhenkwah Bundh Scheme Uttar

Pradesh

Medium 0.89 1310 31.03.1978

172.   

         

 

6th 14.03.1978 Dimu Irigation Scheme West

Bengal

Medium 0.28 470 30.03.1978

173.   

         

 

6th 14.03.1978 RE of Machhu-II Irrigation Project Gujarat Medium 3.25 7402 11.04.1978

174.   

         

 

7th 21.07.1978 Bansagar Project Unit-I Madhya

Pradesh

Major 91.31 248800 10.08.1978

175.   

         

 

7th 21.07.1978 Construction of New Okhla Barrage Uttar

Pradesh

Major 25.37 0 09.08.1978

176.   

         

 

7th 21.07.1978 Pahumara Irrigation Scheme Assam Medium 5 12950 04.09.1978

177.   

         

 

7th 21.07.1978 Rupahi Irrigation Scheme Assam Medium 1.83 4937 04.09.1978

178.   

         

 

7th 21.07.1978 Bilasi Reservoir Scheme Bihar Medium 1.46 2306 19.08.1978

179.   

         

 

7th 21.07.1978 Mitti Irrigation Scheme Gujarat Medium 1.88 1571 11.08.1978

180.   

         

 

7th 21.07.1978 Venue-II Irrigation Project Gujarat Medium 3.24 5285 11.08.1978

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n181.   

         

 

7th 21.07.1978 RE of Phophal Irrigation Project Gujarat Medium 3.1 4056 11.08.1978

182.   

         

 

7th 21.07.1978 Maskinala Project Karnatak

a

Medium 3.11 2832 05.08.1978

183.   

         

 

7th 21.07.1978 Upper Mullamari Project Karnatak

a

Medium 3.28 3278 05.08.1978

184.   

         

 

7th 21.07.1978 Khanha Bakut Project Madhya

Pradesh

Medium 1.6 4000 19.08.1978

185.   

         

 

7th 21.07.1978 Ghongha Reservoir Project Madhya

Pradesh

Medium 2.15 7692 19.08.1978

186.   

         

 

7th 21.07.1978 Mehgaon Tela Tank Project Madhya

Pradesh

Medium 1.38 1780 19.08.1978

187.   

         

 

7th 21.07.1978 Vadivale Irrigation Project Maharas

htra

Medium 3.3 3886 11.08.1978

188.   

         

 

7th 21.07.1978 Kalimatitola Tank Project Maharas

htra

Medium 1.24 4194 11.08.1978

189.   

         

 

7th 21.07.1978 Morna Irrigation Project Maharas

htra

Medium 2.21 2240 11.08.1978

190.   

         

 

7th 21.07.1978 Kanjhari Irrigation Project Orissa Medium 7.44 9200 08.08.1978

191.   

         

 

7th 21.07.1978 Mokameh Tal Drainage Scheme Phase-

II

Bihar Flood

control

2.92

192.   

         

 

7th 21.07.1978 Narayanpur Protection Scheme Bihar Flood

control

2.69

193.   

         

 

7th 21.07.1978 Remodelling of Najafgarh drain

fromDhansa to Bharahnagar Bridge

Delhi Flood

control

18.77

194.   

         

 

7th 21.07.1978 Jamuna Basin Drainage Scheme West

Bengal

Flood

control

5.38

195.   

         

 

8th 17.11.1978 Arpa Project Madhya

Pradesh

Major 32.13 85000 22.02.1979

196.   

         

 

8th 17.11.1978 Second RE of Sukla Irrigation Scheme Assam Medium 4.9 22509 06.02.1979

197.   

         

 

8th 17.11.1978 Igo-Phey Irrigation Scheme of Leh Jammu

&

Kashmir

Medium 5.95 3316 02.01.1979

198.   

         

 

8th 17.11.1978 Tral Lift Irrigation Jammu

&

Kashmir

Medium 6.12 6000 02.01.1979

199.   

         

 

8th 17.11.1978 Raipura Lift Irrigation Scheme Jammu

&

Kashmir

Medium 2.13 2430 21.01.1979

200.   

         

 

8th 17.11.1978 Lower Mulla Mari Project Karnatak

a

Medium 8.36 11340 15.01.1979

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n201.   

         

 

8th 17.11.1978 Sakalda Tank Project Madhya

Pradesh

Medium 1.66 1671 23..01.1979

202.   

         

 

8th 17.11.1978 RE of Bila Project Madhya

Pradesh

Medium 3.11 22.01.1979

203.   

         

 

8th 17.11.1978 RE of Dudhawa Tank Project Madhya

Pradesh

Medium 4.3 22.01.1979

204.   

         

 

8th 17.11.1978 Matiyari tank Project Madhya

Pradesh

Medium 4.83 9906 23.03.1979

205.   

         

 

8th 17.11.1978 Khumari Nala Project Maharas

htra

Medium 0.81 1353 06.02.1979

206.   

         

 

8th 17.11.1978 Harabangi Irrigation Project Orissa Medium 9.09 14475 05.02.1979

207.   

         

 

8th 17.11.1978 Gumti Irrigation Scheme Tripura Medium 5.88 9800 19.01.1979

208.   

         

 

8th 17.11.1978 Construction of Hulwana Diversion Drain Uttar

Pradesh

Flood

control

15.15

209.   

         

 

9th 27.02.1979 Mahi-Bajaj Sagar Project Unit-I Gujarat

&

Rajastha

Major 67.33

210.   

         

 

9th 27.02.1979 Mahi-Bajaj Sagar Project Unit-II Gujarat

&

Rajastha

Medium 35.81

211.   

         

 

9th 27.02.1979 Dudhi River Project Madhya

Pradesh

Medium 2.86 4047 28.03.1979

212.   

         

 

9th 27.02.1979 Choral River Project Madhya

Pradesh

Medium 3.96 4290 28.03.1979

213.   

         

 

9th 27.02.1979 Chikutra Irrigation Project Maharas

htra

Medium 4.28 4696 21.04.1979

214.   

         

 

9th 27.02.1979 Kalu Irrigation Project Maharas

htra

Medium 2.76 3540 2.04.1979

215.   

         

 

9th 27.02.1979 Kasari Irrigation Project Maharas

htra

Medium 6.15 9458 21.04.1979

216.   

         

 

9th 27.02.1979 Kadyi Irrigation Project Maharas

htra

Medium 3.47 9996 02.04.1979

217.   

         

 

9th 27.02.1979 Medduvalasa Reservoir Project Andhra

Pradesh

Medium 8.45 9996 02.04.1979

218.   

         

 

9th 27.02.1979 Drainage and Flood Plan for New Okhla

Industrial Development Area

Uttar

Pradesh

Flood

control

10.04

219.   

         

 

9th 27.02.1979 Protection Works for Kosi Flood

Embankments and Afflux Bunds

Bihar Flood

control

3.05

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n220.   

         

 

10th 06.06.1979 RE of Hasdeo Right Bank Canal Madhya

Pradesh

Major 13.38 41978 06.08.1979

221.   

         

 

10th 06.06.1979 Cheyyeru Resureir Project Andhra

Pradesh

Major 9.15 9105 16.08.1979

222.   

         

 

10th 06.06.1979 Bassi Rajastha

n

Major 2.33 2177 07.08.1979

223.   

         

 

10th 06.06.1979 Gosunda Rajastha

n

Major 7.09 2177 07.08.1979

224.   

         

 

10th 06.06.1979 Kodar Madhya

Pradesh

Major 25.75 7600 07.08.1979

225.   

         

 

10th 06.06.1979 Sipu Reservoir Gujarat Major 18.8 22071 14.07.1980

226.   

         

 

10th 06.06.1979 Hazipur-Bazidpur Embankment Scheme Bihar Flood

control

11.47

227.   

         

 

11th 11.09.1979 Halali Project Madhya

Pradesh

Major 13.06 37626 26.07.1982

228.   

         

 

11th 11.09.1979 Jankhari Reservoir Project Gujarat Major 18.69 20612 13.09.1982

229.   

         

 

11th 11.09.1979 Rajghat Dam Madhya

Pradesh

& Uttar

Major 123.22 239241 25.07.1980

230.   

         

 

11th 11.09.1979 RE of Bhadar Irrigation Project Gujarat Major 4.22 17166 20.11.1979

231.   

         

 

12th 12.11.1979 Thoubal Multi-purpose Project Manipur Major 47.25 33400 01.05.1980

232.   

         

 

12th 12.11.1979 Khowai Irrigation Project Tripura Medium 7.1 9320 20.03.1980

233.   

         

 

12th 12.11.1979 Buridehingi Lift Irrigation Assam Medium 1.13 4696 11.02.1980

234.   

         

 

12th 12.11.1979 Bundala Irrigation Project Madhya

Pradesh

Medium 2.18 3159 10.03.1980

235.   

         

 

12th 12.11.1979 Chandora Tank Project Madhya

Pradesh

Medium 2.92 2773 10.03.1980

236.   

         

 

12th 12.11.1979 Banki Tank Project Madhya

Pradesh

Medium 3.12 3441 10.03.1980

237.   

         

 

12th 12.11.1979 Gomukh Project Madhya

Pradesh

Medium 3.5 6235 10.03.1980

238.   

         

 

12th 12.11.1979 Seer Lift Irrigation Jammu

&

Kashmir

Medium 1.82 3590 11.02.1981

239.   

         

 

12th 12.11.1979 Mondovi Irrigation Project Goa Medium 13.11 11200 1980

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n240.   

         

 

12th 12.11.1979 RE of Potteru Irrigation Project Orissa Major 48.86 109000 12.12.1979

241.   

         

 

12th 12.11.1979 Eastern Ganga Canal Project Uttar

Pradesh

Major 48.46 104555 17.03.1980

242.   

         

 

12th 12.11.1979 RE of Bhimsagar Irrigation Project Rajastha

n

Medium 7.47 7900 12.03.1980

243.   

         

 

12th 12.11.1979 Maudaha Dam Project Uttar

Pradesh

Major 26.75 28240

244.   

         

 

12th 12.11.1979 Boralia Irrigation Project Assam Medium 6.77 13562 11.02.1980

245.   

         

 

13th 19.03.1980 Thoubal Multi-purpose Project Manipur Major 47.25 33400 01.05.1980

246.   

         

 

13th 19.03.1980 Champamati Irrigation Project Assam Major 15.32 24994 29.04.1980

247.   

         

 

13th 19.03.1980 RE of Parallel Lower Ganga Canal

Project

Uttar

Pradesh

Major 49.42 89900 29.04.1980

248.   

         

 

13th 19.03.1980 Project for replacement of Lahchura

Dam

Uttar

Pradesh

Major 8.52 50125 29.04.1980

249.   

         

 

13th 19.03.1980 Project for Lining of Distributaries and

Minors

Punjab Major 152.03 1857638 03.07.1980

250.   

         

 

13th 19.03.1980 North Koel Reservoir Project Bihar Major 113.77 53060

251.   

         

 

13th 19.03.1980 Hawaipur Lift Irrigation Scheme Assam Medium 1.98 3887 25.02.1981

252.   

         

 

13th 19.03.1980 Bah Project Madhya

Pradesh

Medium 13.98 11048 30.05.1980

253.   

         

 

13th 19.03.1980 Sagar Project Madhya

Pradesh

Medium 10.63 9713 30.05.1980

254.   

         

 

13th 19.03.1980 Doraha Project Madhya

Pradesh

Medium 2.48 2833 30.05.1980

255.   

         

 

13th 19.03.1980 Kaliasote Project Madhya

Pradesh

Medium 9.32 11093 30.05.1980

256.   

         

 

13th 19.03.1980 Tillar Dam Project Madhya

Pradesh

Medium 5.77 6000 30.05.1980

257.   

         

 

13th 19.03.1980 Bankbal Irrigation Project Orissa Medium 5.72 7560 13.06.1980

258.   

         

 

13th 19.03.1980 Kelia Irrigation Project Gujarat Medium 2.84 3341 14.05.1980

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n259.   

         

 

13th 19.03.1980 Jhuj Irrigation Project Gujarat Medium 5.36 5600 14.05.1980

260.   

         

 

13th 19.03.1980 Chhapi Irrigation Project Rajastha

n

Medium 5.9 6437 04.06.1980

261.   

         

 

13th 19.03.1980 Bilas Irrigation Project Rajastha

n

Medium 2.7 2547 22.07.1980

262.   

         

 

13th 19.03.1980 Ferozepura Storage Scheme Jammu

&

Kashmir

Medium 13.12

263.   

         

 

13th 19.03.1980 Varnow Storage Scheme Jammu

&

Kashmir

Medium 5.54

264.   

         

 

13th 19.03.1980 Khuga Irrigation Project Manipur Medium 15 14755 25.07.1980

265.   

         

 

13th 19.03.1980 Sonkh Irrigation Maharas

htra

Medium 3.52 2834 14.05.1980

266.   

         

 

13th 19.03.1980 Mandovi Irrigation Project Goa Medium 13.1 11200 1980

267.   

         

 

13th 19.03.1980 Krishnapuram Reservoir Scheme Andhra

Pradesh

Medium 2.46 2480

268.   

         

 

13th 19.03.1980 Patna Flood protection Scheme Bihar Flood

control

27.13

269.   

         

 

13th 19.03.1980 Flood protection Scheme (Phase I &II)

under Ghatal Master Plan

West

Bengal

Flood

control

49.17

270.   

         

 

14th 07.06.1980 Second RE of Pamba Irrigation Project Kerala Major 42.97 41682 24.07.1980

271.   

         

 

14th 07.06.1980 Second RE of Periyar Valley Project Kerala Major 39.71 85600 24.07.1980

272.   

         

 

14th 07.06.1980 Second RE of Haripura Reservoir Uttar

Pradesh

Major 6.91 20000 25.07.1980

273.   

         

 

14th 07.06.1980 RE of the Western Kosi Canal Project Bihar Major 161.8 219000 25.07.1980

274.   

         

 

14th 07.06.1980 Mahi Project Madhya

Pradesh

Major 61.52 26429 01.01.1985

275.   

         

 

14th 07.06.1980 Upper Kangsabati West

Bengal

Major 43.84 59000

276.   

         

 

14th 07.06.1980 Tangon Valley Project West

Bengal

Major 13.6

277.   

         

 

14th 07.06.1980 Bamangola-Habibpur Irrigation Scheme West

Bengal

Major 21.67

278.   

         

 

14th 07.06.1980 RE of Kanupur Canal Scheme Andhra

Pradesh

Medium 4.94 4027 24.06.1980

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n279.   

         

 

14th 07.06.1980 Guhai Irrigation Scheme Gujarat Medium 9.32 8326 30.12.1980

280.   

         

 

14th 07.06.1980 Harnav Projec Stage-II Gujarat Medium 3.49 3440 12.02.1981

281.   

         

 

14th 07.06.1980 Budhana Nalla Project Madhya

Pradesh

Medium 1.99 2349 25.07.1980

282.   

         

 

14th 07.06.1980 Khuga Irrigation Project Manipur Medium 15 14755 25.07.1980

283.   

         

 

14th 07.06.1980 Sawan Bhadon Irrigation Project Rajastha

n

Medium 4.18 4908 25.07.1981

284.   

         

 

14th 07.06.1980 Repairs and Strengthening of Nanak

Sagar Dam

Uttar

Pradesh

Medium 3.32 24.07.1980

285.   

         

 

15th 28.11.1980 RE of Pazhassi Irrigation Project Kerala Major 42 32400 20.01.1981

286.   

         

 

15th 28.11.1980 RE of Loktak Lift Irrigation Project Manipur Major 16.86 40000 24.02.1981

287.   

         

 

15th 28.11.1980 RE of Kallada Irrigation Project Kerala Major 163.57 92800 27.01.1981

288.   

         

 

15th 28.11.1980 Punasi Reservoir Project Bihar Major 26.09

289.   

         

 

15th 28.11.1980 Construction of Bhimgoda Barrage

Project

Uttar

Pradesh

Major 22.45 12.03.1981

290.   

         

 

15th 28.11.1980 Mahi Irrigation Project Madhya

Pradesh

Major 61.52 26429 01.01.1985

291.   

         

 

15th 28.11.1980 Modernisation of existing channels

(Phase-I)

Haryana Major 77.11 96377 22.02.1982

292.   

         

 

15th 28.11.1980 Rajghat Canal Project Madhya

Pradesh

Major 46.15 97158 23.03.2001

293.   

         

 

15th 28.11.1980 Masan Reservoir Project Bihar Major 34.73

294.   

         

 

15th 28.11.1980 RE of Giri Irrigation Project Himacha

l

Pradesh

Medium 6.57 4000 16.03.1981

295.   

         

 

15th 28.11.1980 Lakhundar Dam Project Madhya

Pradesh

Medium 4.26 4050 25.02.1981

296.   

         

 

15th 28.11.1980 Hawaipur Lift Irrigation Scheme Assam Medium 1.98 3887 25.02.1981

297.   

         

 

15th 28.11.1980 Chirapani Project Madhya

Pradesh

Medium 8.57 8000 25.02.1981

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n298.   

         

 

15th 28.11.1980 Vembakottai Reservoir Project Tamil

Nadu

Medium 3.65 3279 20.01.1981

299.   

         

 

15th 28.11.1980 Effluent Irrigation Scheme from Okhla

Treatment Plant to Mehrauli and

Najafgarh

Delhi Medium 6.86 8016 20.01.981

300.   

         

 

15th 28.11.1980 Manu Irrigation Project Tripura Medium 8.18 7580 25.02.1981

301.   

         

 

15th 28.11.1980 Hadaf Irrigation Scheme Gujarat Medium 6.77 4950 11.02.1981

302.   

         

 

15th 28.11.1980 Badanala Irrigation Project Orissa Medium 11.39 8653 07.01.1981

303.   

         

 

15th 28.11.1980 Kasartera Project Madhya

Pradesh

Medium 6.01 9473 25.02.1981

304.   

         

 

15th 28.11.1980 Nakti Reservoir Scheme Bihar Medium 4.14 2315 20.02.1981

305.   

         

 

15th 28.11.1980 Narihalla Project Karnatak

a

Medium 3.5

306.   

         

 

15th 28.11.1980 Vamanapuram Irrigation Project Kerala Medium 36.4 18041 13.12.1982

307.   

         

 

15th 28.11.1980 Natuwadi Irrigation Scheme Maharas

htra

Medium 8.29

308.   

         

 

15th 28.11.1980 Protection works for Kosi Flood

Embankments and Afflux bunds

Bihar Flood

control

2.89

309.   

         

 

15th 28.11.1980 Strengthening of embankment and anti-

erosion works between 3.9 to 35 kms in

Piprasi pipraghat Embankments

Bihar Flood

control

2.9

310.   

         

 

15th 28.11.1980 Estimate for Revetment and slope

protection works along Right Bank of

River Ganga Between Digha to

Didargani

Bihar Flood

control

1.55

311.   

         

 

15th 28.11.1980 Construction of Supplementary Drain Delhi Flood

control

25.07

312.   

         

 

16th 28.03.1981 Muvattupuzhe Valley Irrigation Project Kerala Major 48.08 39048 06.06.1983

313.   

         

 

16th 28.03.1981 Sri Sailem Right Bank Canal Project Andhra

Pradesh

Major 220.22 76890 16.05.1981

314.   

         

 

16th 28.03.1981 Nandur Medhmeshwar Project Maharas

htra

Major 72.66

315.   

         

 

16th 28.03.1981 Samakoi Irrigation Project Orissa Major 26.35

316.   

         

 

16th 28.03.1981 Sajnam Dam Project Uttar

Pradesh

Major 8.44 7145 15.05.1981

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n317.   

         

 

16th 28.03.1981 RE of Khera Canal Project Uttar

Pradesh

Medium 4.18 7500 26.05.1981

318.   

         

 

16th 28.03.1981 RE of Som Kagdar Irrigation Project Rajastha

n

Medium 22.3 5739 27.09.1992

319.   

         

 

16th 28.03.1981 RE of Deo Irrigation Scheme Gujarat Medium 12

320.   

         

 

16th 28.03.1981 Kunwari Lift Irrigatio0n Scheme Madhya

Pradesh

Medium 1.03 3926 02.05.1981

321.   

         

 

16th 28.03.1981 Demi II Irrigation Scheme Gujarat Medium 5.37 3437 04.05.1981

322.   

         

 

16th 28.03.1981 Aji III Irrigation Scheme Gujarat Medium 13.23 6837 04.05.1981

323.   

         

 

16th 28.03.1981 Aji II Irrigation Scheme Gujarat Medium 6.22 2390 04.05.1981

324.   

         

 

16th 28.03.1981 Latratu Reservoir Project Bihar Medium 10.98 10200 25.05.1981

325.   

         

 

16th 28.03.1981 Tapkara Reservoir Project Bihar Medium 2.03 1860 25.05.1981

326.   

         

 

16th 28.03.1981 Sulu Reservoir Project Bihar Medium 3.12 4441 25.05.1981

327.   

         

 

16th 28.03.1981 Tarlo Reservoir Project Bihar Medium 5.73 1225 25.05.1981

328.   

         

 

16th 28.03.1981 Sonua Reservoir Scheme Bihar Medium 8.92 4696 25.05.1981

329.   

         

 

16th 28.03.1981 Nandini Reservoir Project Bihar Medium 4.47 4098 25.05.1981

330.   

         

 

16th 28.03.1981 Kasarsai Irrigation Project Maharas

htra

Medium 2.7 3643 04.05.1981

331.   

         

 

16th 28.03.1981 Khairi Irrigation Project Maharas

htra

Medium 2.37 1961 04.05.1981

332.   

         

 

16th 28.03.1981 Kumbhi Lift Irrigation Project Maharas

htra

Medium 5.16 8887 04.05.1981

333.   

         

 

16th 28.03.1981 Andhra Reservoir Scheme Andhra

Pradesh

Medium 5.4

334.   

         

 

16th 28.03.1981 Jhanjhavathi Reservoir Project Andhra

Pradesh

Medium 15.09

335.   

         

 

16th 28.03.1981 Noupur Irrigation Project Maharas

htra

Medium 1.89 2242 04.05.1981

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n336.   

         

 

16th04.

05.1981

28.03.1981 Palsi Medium Irrigation Project Maharas

htra

Medium 3.18 2550 04.05.1981

337.   

         

 

16th 28.03.1981 Sindwarni Reservoir Project Bihar Medium 4.45

338.   

         

 

16th 28.03.1981 Karwappa Nalla Irrigation Project Maharas

htra

Medium 4.7 4725 04.05.1981

339.   

         

 

16th 28.03.1981 Dongargaon Tank Irrigation Project Maharas

htra

Medium 2.15 3737 04.05.1981

340.   

         

 

16th 28.03.1981 Khudia Reservoir Project Bihar Medium 1.31

341.   

         

 

16th 28.03.1981 Extension of Kamla-Balan Embankment

Phase 1 from Darjia to Kotharam

Bihar Flood

Control

4.93

342.   

         

 

16th 28.03.1981 Anti-erosion works and Retired

embankment from 0-35 KM in Piprasi-

Pipraghat reach on Right Bank of the

Gandak

Bihar Flood

Control

3.92

343.   

         

 

17th 24.07.1981 Shahipur Kandi Barrage and Power

Plant Scheme

Punjab 124.3

344.   

         

 

17th 24.07.1981 RE of Lakhwar Vyasi Pariojana Uttar

Pradesh

Major 252.02

345.   

         

 

17th 24.07.1981 RE of Tawi Lift Irrigation Scheme Jammu

&

Kashmir

Major 7.12 13036 24.09.1981

346.   

         

 

17th 24.07.1981 Puthimari Irrigation Project Assam Major 25.82

347.   

         

 

17th 24.07.1981 Muvattpuzha Valley Irrigation Project Kerala Major 48.08 39046 06.06.1983

348.   

         

 

17th 24.07.1981 Rangawali River Medium Irrigation

Project

Maharas

htra

Medium 3.52 3290 20.10.1981

349.   

         

 

17th 24.07.1981 Amarawati River Medium Irrigation

Project

Maharas

htra

Medium 4.63 3252 20.10.1981

350.   

         

 

17th 24.07.1981 Sonwad Medium Irrigation Project Maharas

htra

Medium 3.13 2361 20.10.1981

351.   

         

 

17th 24.07.1981 Shahanur River Medium Irrigation

Project

Maharas

htra

Medium 8.77 9556 20.10.1981

352.   

         

 

17th 24.07.1981 Koradi Nalla Medium Irrigation Project Maharas

htra

Medium 3.79 4832 20.10.1981

353.   

         

 

17th 24.07.1981 Borgaon Tank Project Maharas

htra

Medium 1.61 2634 20.10.1981

354.   

         

 

17th 24.07.1981 Delhi River Medium Irrigation Project Maharas

htra

Medium 6.48 4353 20.10.1981

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n355.   

         

 

17th 24.07.1981 Bahula River Medium Irrigation Project Maharas

htra

Medium 5.91 4654 20.10.1981

356.   

         

 

17th 24.07.1981 Hivra River Medium Irrigation Project Maharas

htra

Medium 3.43 2521 20.10.1981

357.   

         

 

17th 24.07.1981 Madan Tank Medium Irrigation Project Maharas

htra

Medium 3.08 3280 20.11.1981

358.   

         

 

17th 24.07.1981 Anjani River Medium Irrigation Project Maharas

htra

Medium 4.91 3669 20.11.1981

359.   

         

 

17th 24.07.1981 Torna River Medium Irrigation Project Maharas

htra

Medium 1.46 1849 20.11.1981

360.   

         

 

17th 24.07.1981 Mun River Medium Irrigation Project Maharas

htra

Medium 5.34 11060 20.11.1981

361.   

         

 

17th 24.07.1981 Dakranala Pump Canal Scheme Bihar Medium 4.75 4024 17.10.1981

362.   

         

 

17th 24.07.1981 Kansbahal Medium Irrigation Project Orissa Medium 5.39 7640 29.09.1981

363.   

         

 

17th 24.07.1981 Upper Jonk Irrigation Project Orissa Medium 12.77 13890 29.09.1981

364.   

         

 

17th 24.07.1981 Bhadar Reservoir Project (Panchmahals) Gujarat Medium 13.11 5480 20.10.1981

365.   

         

 

17th 24.07.1981 Balh Valley Irrigation Project Himacha

l

Pradesh

Medium 3.02

366.   

         

 

17th 24.07.1981 Buti Nala Irrigation Project Maharas

htra

Medium 8.82 11060 20.11.1981

367.   

         

 

17th 24.07.1981 Pohar Nala Irrigation Project Maharas

htra

Medium 6.62 10205 20.11.1981

368.   

         

 

17th 24.07.1981 Garada Irrigation Project Rajastha

n

Medium 10.21

369.   

         

 

17th 24.07.1981 Kasjor Reservoir Project Bihar Medium 8.66 6340 17.10.1981

370.   

         

 

17th 24.07.1981 Upper Sankh Reservoir Project Bihar Medium 9.18 7110 17.10.1981

371.   

         

 

17th 24.07.1981 Vaniar Reservoir Project Tamil

Nadu

Medium 5.6 3460 24.09.1981

372.   

         

 

17th 24.07.1981 Ichambadi Anicut Tamil

Nadu

Medium 2.29 2529 24.09.1981

373.   

         

 

17th 24.07.1981 Anti-erosion works on Left Bank ofRiver

Ganga

Bihar FC 4.99

374.   

         

 

17th 24.07.1981 RE of Darbhanga Town Protection work

Scheme

Bihar FC 3.14

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n375.   

         

 

17th 24.07.1981 RE of Buxar Koelwar Embankment Bihar FC 26.28

376.   

         

 

18th 23.11.1981 Subernarekha Multipurpose Project Bihar 480.9

377.   

         

 

18th 23.11.1981 Shahpur Kandi Barrage and Power Plant

Scheme

Punjab 124.3

378.   

         

 

18th 23.11.1981 RE of LakhwarVyasi Project Uttar

Pradesh

276.42

379.   

         

 

18th 23.11.1981 Kanhar Irrigation Project Uttar

Pradesh

Major 89.74

380.   

         

 

18th 23.11.1981 Lower Dudha Project Maharas

htra

Major 53.2 36733 31.03.1983

381.   

         

 

18th 23.11.1981 RE of Bardikarai Irrigation Scheme Assam Major 14.87 27530 02.03.1982

382.   

         

 

18th 23.11.1981 Modernisation of Existing channels Haryana Major 77.11 95377 22.02.1982

383.   

         

 

18th 23.11.1981 Siktia Barrage Project Bihar Major 66.03

384.   

         

 

18th 23.11.1981 RE of Salauli Irrigation Project Goa Major 35.2903 05.06.1982

385.   

         

 

18th 23.11.1981 RE of Potteru Irrigation Project Orissa Major 58.41 109000 06.03.1982

386.   

         

 

18th 23.11.1981 RE of the Phulwara Reservoir Scheme Bihar Major 21.56 9532 15.10.1982

387.   

         

 

18th 23.11.1981 Surangi Reservoir Scheme Bihar Medium 2.14 1529 01.03.1982

388.   

         

 

18th 23.11.1981 Sukli Project Rajastha

n

Medium 5.48

389.   

         

 

18th 23.11.1981 RE of Koil Lift Irrigation Scheme Jammu

&

Kashmir

Medium 5.56 2327 04.09.1982

390.   

         

 

18th 23.11.1981 Ramrekha Reservoir Project Bihar Medium 6.86

391.   

         

 

18th 23.11.1981 RE of Strengthening of Sardasagar Dam Uttar

Pradesh

Medium 6.48

392.   

         

 

18th 23.11.1981 Devarjan Medium Irrigation Project Maharas

htra

Medium 1.52 1880 24.02.1982

393.   

         

 

18th 23.11.1981 Rui Medium Irrigation Project Maharas

htra

Medium 1.78 1650 24.02.1982

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n394.   

         

 

18th 23.11.1981 RE of Tral Lift Irrigation Scheme Jammu

&

Kashmir

Medium 14.91 6000

395.   

         

 

18th 23.11.1981 RE of Rajpore Lift Irrigation Scheme Jammu

&

Kashmir

Medium 8.46 2430

396.   

         

 

18th 23.11.1981 Bandia Nalla Irrigation Project Madhya

Pradesh

Medium 1.8 2478 01.03.1982

397.   

         

 

18th 23.11.1981 Kanhargaon Tank Irrigation Project Madhya

Pradesh

Medium 5.22 3724 01.03.1982

398.   

         

 

18th 23.11.1981 RE of Wagon Irrigation Project Rajastha

n

Medium 5.5 10556 20.02.1982

399.   

         

 

18th 23.11.1981 Baski Irrigation-cum-Water Supply

Project

Bihar Medium 13.02

400.   

         

 

18th 23.11.1981 Rongai Valley Irrigation Project Meghala

ya

Medium 4.2

401.   

         

 

18th 23.11.1981 Panzan Irrigation Project Maharas

htra

Medium 2.5

402.   

         

 

18th 23.11.1981 Parwan Lift Irrigation Scheme Rajastha

n

Medium 3.79 5976 07.04.1982

403.   

         

 

18th 23.11.1981 Vamanapuram Irrigation Project Kerala Medium 36.4

404.   

         

 

18th 23.11.1981 Tamluk Drainage Scheme in the Distt of

Midnapora (Phase-I&II)

West

Bengal

FC 8.48 02.03.1982

405.   

         

 

19th 03.03.1982 Subernrekha Multipurpose Project Orissa 221.63

406.   

         

 

19th 03.03.1982 Bagmati Irrigation and Flood Control

Project

Bihar 185.7

407.   

         

 

19th 03.03.1982 Second RE of Kuttiadi Irrigation Project Kerala Major 44.84 31161

408.   

         

 

19th 03.03.1982 Kanhar Irrigation Project Uttar

Pradesh

Major 89.4603 05.06.1982

409.   

         

 

19th 03.03.1982 RE of Salauli Irrigation Project Goa Major 35.29

410.   

         

 

19th 03.03.1982 Panzan Irrigation Project Maharas

htra

Medium 2.5 2011 15.04.1982

411.   

         

 

19th 03.03.1982 Parwan Lift Irrigation Scheme Rajastha

n

Medium 3.79 5976 07.04.1982

412.   

         

 

19th 03.03.1982 Vamanapuram Irrigation Project Kerala Medium 36.4 18014 13.12.1982

413.   

         

 

19th 03.03.1982 Mazam Irrigation Project Gujarat Medium 10.99 5259 16.04.1982

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n414.   

         

 

19th 03.03.1982 RE of Imphal Barrage Manipur Medium 4.62 6400 14.04.1983

415.   

         

 

19th 03.03.1982 Umaria Irrigation Project Gujarat Medium 2.82 2345 31.03.1984

416.   

         

 

19th 03.03.1982 Barni Irrigation Project Rajastha

n

Medium 5.25

417.   

         

 

19th 03.03.1982 Lhasi Irrigation Project Rajastha

n

Medium 5.44

418.   

         

 

19th 03.03.1982 Kelavarapalli Reservoir Scheme Tamil

Nadu

Medium 5.51

419.   

         

 

19th 03.03.1982 Ajgaibinath Pump Canal Scheme Bihar Medium 16.8

420.   

         

 

19th 03.03.1982 Constn. Of Ujina Diversion Drain &

Remodelling Ujina Drainage System

Haryana FC 31.67

421.   

         

 

19th 03.03.1982 Constn. Of Baria Sansartola Bund Uttar

Pradesh

FC 2.91

422.   

         

 

20th 10.05.1982 RE of Upper Krishna Project Stage-I Karnatak

a

1214.97 458500 24.09.1990

423.   

         

 

20th 10.05.1982 Narayanpur dam to its ultimate height

of 492.25m

Karnatak

a

424.   

         

 

20th 10.05.1982 Narayanpur L.B.C. 78 km long &

distribution system to irrigate annually

an area of 4.41 lakh ha.

Karnatak

a

425.   

         

 

20th 10.05.1982 Almattio dam for an FRL of 512.20 m Karnatak

a

426.   

         

 

20th 10.05.1982 Almatti L.B.C. 50 km long & distribution

system to irrigate annually an area of

.17 lakh ha.

Karnatak

a

427.   

         

 

21st 08.07.1982 Chimoni Irrigation Project Kerala Major 23.43

428.   

         

 

21st 08.07.1982 Tilaiya Dhadhar Diversion Project Bihar Major 46.74

429.   

         

 

21st 08.07.1982 Auranga Reservoir Project Bihar Major 125.4

430.   

         

 

21st 08.07.1982 Lower Tirna Project Maharas

htra

Major 37.65

431.   

         

 

21st 08.07.1982 Jaspur Reservoir Project Haryana Major 29.41

432.   

         

 

21st 08.07.1982 Dhanaura Reservoir Project Haryana Major 30.68

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n433.   

         

 

21st 08.07.1982 Raqmpuri Pick Up Weir Cum Pulpulla

Dummy Storage Irrigation Project

Madhya

Pradesh

Medium 6.34

434.   

         

 

21st 08.07.1982 Dokariya Tank Irrigation Project Madhya

Pradesh

Medium 2.28 2924 14.01.1983

435.   

         

 

21st 08.07.1982 Dejla Dewda Irrigation Project Madhya

Pradesh

Medium 16.43 12150 14.01.1983

436.   

         

 

21st 08.07.1982 Dhan-Singh Toli Reservoir Scheme Bihar Medium 4.76

437.   

         

 

21st 08.07.1982 Bethali Irrigation Project Rajastha

n

Medium 5.25

438.   

         

 

21st 08.07.1982 Bori River Irrigation Project Maharas

htra

Medium 7.62

439.   

         

 

21st 08.07.1982 Patgaon Irrigation Project Maharas

htra

Medium 7.39 8792 04.05.1985

440.   

         

 

21st 08.07.1982 Hatwane Irrigation Project Maharas

htra

Medium 19.55

441.   

         

 

21st 08.07.1982 Protection works for Kosi Flood

Embankments

Bihar FC 5.13

442.   

         

 

22nd 06.01.1983 Sardar Sarovar Project Uttar

Pradesh

4240

443.   

         

 

22nd 06.01.1983 Siktia (Ajoy) Barrage Project Bihar Major 66.03

444.   

         

 

22nd 06.01.1983 Raising of Kota Barrage Rajastha

n

Major 0.91

445.   

         

 

22nd 06.01.1983 Kanchi Irrigation Project Bihar Major 4.85

446.   

         

 

22nd 06.01.1983 Chimoni Irrigation Project Kerala Major 23.43

447.   

         

 

22nd 06.01.1983 Mahi Irrigation Project Madhya

Pradesh

Major 61.52 26429 01.01.1985

448.   

         

 

22nd 06.01.1983 Rajghat Canal Irrigation Scheme Madhya

Pradesh

Major 46.15

449.   

         

 

22nd 06.01.1983 Auranga Reservoir Project Bihar Major 125.4 55405 15.09.1985

450.   

         

 

22nd 06.01.1983 RE of Phulwaria Reservoir Scheme Bihar Medium 21.56 9532 15.10.1984

451.   

         

 

22nd 06.01.1983 Satpotka Reservoir Bihar Medium 5.95

452.   

         

 

22nd 06.01.1983 Uben Irrigation Scheme Gujarat Medium 12.49 2198 20.01.1993

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n453.   

         

 

22nd 06.01.1983 RE of Sekmai Barrage Project Manipur Medium 5.37 8498 03.10.1983

454.   

         

 

22nd 06.01.1983 Deo Irrigation Project Orissa Medium 52.23 15645 29.06.1992

455.   

         

 

22nd 06.01.1983 Urmodi Irrigation Project Maharas

htra

Medium 18.85 10640 02.03.1984

456.   

         

 

22nd 06.01.1983 RE of Ranapratap Sagar Project

(Chambal Stage II )

Rajastha

n

36.41

457.   

         

 

22nd 06.01.1983 RE of Torai Reservoir Project Bihar Medium 15.97

458.   

         

 

22nd 06.01.1983 RE of Sunder Reservoir Bihar Medium 6.44

459.   

         

 

22nd 06.01.1983 RE of Gumani Reservoir Bihar Medium 18.71

460.   

         

 

22nd 06.01.1983 Piplad Irrigation Project Rajastha

n

Medium 5.07

461.   

         

 

22nd 06.01.1983 RE of Somkagdor Irrigation Project Rajastha

n

Medium 22.3 5739 27.09.1993

462.   

         

 

22nd 06.01.1983 Barnai Tank Project Madhya

Pradesh

Medium 4.26 2388 13.07.1983

463.   

         

 

22nd 06.01.1983 Baghua Irrigation Project Orissa Medium 6.35 7440 11.04.1983

464.   

         

 

22nd 06.01.1983 Barchar Nalla Tank Project Madhya

Pradesh

Medium 3.78

465.   

         

 

23rd 03.03.1983 RE of Ranapratap Sagar Project

(Chambal Stage II)

Madhya

Pradesh

&

36.41

466.   

         

 

23rd 03.03.1983 Tilliya Dhadhar Diversion Project Bihar Major 46.74

467.   

         

 

23rd 03.03.1983 RE of Phulwaria Reservoir Scheme Bihar Major 21.56 9532 15.10.1984

468.   

         

 

23rd 03.03.1983 RE of Sunder Reservoir Project Bihar Medium 6.44

469.   

         

 

23rd 03.03.1983 RE of Gumani Reservoir Project Bihar Medium 18.71

470.   

         

 

23rd 03.03.1983 RE of Torai Reservoir Project Bihar Medium 15.97

471.   

         

 

23rd 03.03.1983 RE of Somkagdar Irrigation Project Rajastha

n

Medium 22.3 5739 27.09.1993

472.   

         

 

23rd 03.03.1983 Piplad Irrigation Project Rajastha

n

Medium 5.07

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n473.   

         

 

23rd 03.03.1983 Barnai Tank Project Madhya

Pradesh

Medium 4.26 2388 13.07.1983

474.   

         

 

23rd 03.03.1983 Baghua Irrigation Project Orissa Medium 6.35 7440 11.04.1983

475.   

         

 

23rd 03.03.1983 Barchar Nalla Tank Project Madhya

Pradesh

Medium 3.78

476.   

         

 

23rd 03.03.1983 Amwakhas Spur Project on Right Bank

of Gandak in U.P.

Uttar

Pradesh

Flood

Control

3.22

477.   

         

 

23rd 03.03.1983 RE for Sone Embankment Scheme Bihar FC 4.31

478.   

         

 

24th 07.06.1983 Lower Godavari (Vishnuouri) Project Maharas

htra

Major 78.93

479.   

         

 

24th 07.06.1983 Mahan Irrigation Project (Stage I) Madhya

Pradesh

Major 39

480.   

         

 

24th 07.06.1983 Barari Pumped Cabal Scheme Bihar Medium 9.83

481.   

         

 

24th 07.06.1983 Katri Reservoir Scheme Bihar Medium 7.28

482.   

         

 

24th 07.06.1983 Barnai Tank Project Madhya

Pradesh

Medium 4.26 2388 13.07.1983

483.   

         

 

24th 07.06.1983 RE for revetment and slope protection

works along the right bank of river

Ganga

Bihar FC 2.7

484.   

         

 

24th 07.06.1983 Protection works for Kosi flood

Embankments

Bihar FC 3.49

485.   

         

 

25th 01.12.1983 Sindh Rivor Irrigation Project Ph. II Madhya

Pradesh

Major 185

486.   

         

 

25th 01.12.1983 Watrak Reservoir Project Gujarat Major 43.71 16874 26.03.1992

487.   

         

 

25th 01.12.1983 Subarnarekha Barrage Project West

Bengal

Major 215.61 114200 1995

488.   

         

 

25th 01.12.1983 Modernisation of existing Kharjcut Canal

System

Gujarat Medium 8.1 10500 Add/.

2365

20.02.1992

489.   

         

 

25th 01.12.1983 Umaria Irrigation Scheme Gujarat Medium 2.823 2345 31.03.1984

490.   

         

 

25th 01.12.1983 Uben Irrigation Project Gujarat Medium 12.49 2198 20.01.1993

491.   

         

 

25th 01.12.1983 Titilagarh Irrigation Project Orissa Medium 21.13 2950 21.10.1993

492.   

         

 

25th 01.12.1983 Banghalati (Bahuda Stage.II) Irrigation

Project

Orissa Medium 45.44 6050 21.05.1995

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n493.   

         

 

25th 01.12.1983 Urmodi Irrigation Project Maharas

htra

Medium 18.846 10640 02.03.1984

494.   

         

 

25th 01.12.1983 Sina (Nimgaon) Irrigation Project Maharas

htra

Medium

495.   

         

 

25th 01.12.1983 Panchana Irrigation Project Rajastha

n

Medium 17.45

496.   

         

 

25th 01.12.1983 Salayia Reservoir Scheme Bihar Medium 5.952

497.   

         

 

25th 01.12.1983 Kesho Reservoir Scheme Bihar Medium 6.082

498.   

         

 

25th 01.12.1983 Ramrokha Reservoir Scheme Bihar Medium 8.761

499.   

         

 

25th 01.12.1983 Dhansingh toil Reservoir Scheme Bihar Medium 6.379

500.   

         

 

25th 01.12.1983 Satpotka Reservoir Scheme Bihar Medium 0.666

501.   

         

 

26th 22.03.1984 Narmadasagar Project Indira Sagar

project.

Madhya

Pradesh

Major 1994 44363 06.09.1989

502.   

         

 

26th 22.03.1984 Man Irrigation Project Madhya

Pradesh

Major 44.1 17700 05.06.1992

503.   

         

 

26th 22.03.1984 Modernisation of Kangsabati Reservoir

Project

West

Bengal

Major 232.84 401660

504.   

         

 

26th 22.03.1984 Konar Irrigation of Project Medium Major 93.614

505.   

         

 

26th 22.03.1984 Subernarekha Barrage Project Bihar Major 15.85

506.   

         

 

26th 22.03.1984 Wagan Irrigation Project Rajastha

n

Medium 98.2

507.   

         

 

26th 22.03.1984 Khairi Irrigation Project Maharas

htra

Medium 4.967

508.   

         

 

26th 22.03.1984 Panchkhero Reservoir Bihar Medium 7.404

509.   

         

 

26th 22.03.1984 Revised estimate of Rajpura Lift

Irrigation

Jammu

&

Kashmir

Medium 70.3 2430

510.   

         

 

26th 22.03.1984 Bhairwa Reservoir Scheme Bihar Medium 84.81

511.   

         

 

26th 22.03.1984 Baski Reservoir-cum-water Supply

Scheme

Bihar Medium 13.02

512.   

         

 

26th 22.03.1984 Panzan (Nagya-Sakya) Project Maharas

htra

Medium 54.153 2011

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n513.   

         

 

26th 22.03.1984 Shahanoor Irrigation on Project Maharas

htra

Medium 15.238

514.   

         

 

27th 03.09.1984 Singur Storage Project (Irrigation &

W.S)

Andhra

Pradesh

M. P. 42.03

515.   

         

 

27th 03.09.1984 Hatwane Modium Irrigation project Maharas

htra

Medium 24.521

516.   

         

 

27th 03.09.1984 Goj Project Madhya

Pradesh

Medium 87.95

517.   

         

 

27th 03.09.1984 Jobat Irrigation Project Madhya

Pradesh

Medium 30.75 12507 02.01.1985

518.   

         

 

27th 03.09.1984 Mun Medium Irrigation Project Maharas

htra

Medium 13.874

519.   

         

 

27th 03.09.1984 Tembhapuri Medium Irrigation Project Maharas

htra

Medium 18.09 4784 13.07.1995

520.   

         

 

27th 03.09.1984 Bor, Dahogaon Modium Irrigation

Project

Maharas

htra

Medium 16.27 2218 06.11.1996

521.   

         

 

27th 03.09.1984 Sakoi Modium Irrigation Project Maharas

htra

Medium 3.014

522.   

         

 

27th 03.09.1984 Raigaon Medium Irrigation project Maharas

htra

Medium 3.179

523.   

         

 

27th 03.09.1984 Buggavanka Reservoir Scheme Andhra

Pradesh

Medium 78.27

524.   

         

 

27th 03.09.1984 Bandi Sendra Medium Irrigation Project Rajastha

n

Medium

525.   

         

 

27th 03.09.1984 Modernisation of Gambhiri Canal System Rajastha

n

Medium 11.762

526.   

         

 

27th 03.09.1984 Second Rovisod estimate of Western

Kosi Canal Project

Bihar Major 2.222 Nepal portion-

15300 Bihar

portion-

219000527.   

         

 

27th 03.09.1984 Revised estimate of Badlaghat-

Nagarpara Embankment Scheme

Bihar Major 5.309

528.   

         

 

27th 03.09.1984 Estimate for Anti-erosion works and

Retired Embankment from 0.35 Km. in

Piprasi-Pipraghat Reach on Right Ban of

Gandak

Bihar Major 6.59

529.   

         

 

28th 24.09.1984 Modernisation of Sone Canals Project Bihar Major 11.947

530.   

         

 

28th 24.09.1984 Revised Estimates for Ravi Canal Project Jammu

&

Kashmir

Major 62.08 53927

531.   

         

 

28th 24.09.1984 Sutlei – Yamuna Link Canal Project Part-

I

Punjab Major 17.6

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n532.   

         

 

28th 24.09.1984 Sutlei – Yamuna Link Canal Project Part -

III

Punjab Major 54.2

533.   

         

 

28th 24.09.1984 Uppar sakari Reservoir Project Bihar Major 12.382

534.   

         

 

28th 24.09.1984 Mahi Irrigation Project Madhya

Pradesh

Major 61.525 26429 01.01.1985

535.   

         

 

28th 24.09.1984 Sapna & Bodjore Intergrated Irrgn.

Project

Orissa Medium 14.57 3752 6.10.1989

536.   

         

 

28th 24.09.1984 Kusoi project Orissa Medium 27.034

537.   

         

 

28th 24.09.1984 Kharmuza Lift Irrigation Scheme Assam Medium 9.861

538.   

         

 

28th 24.09.1984 Revised estimate of Palar-Porandalar

Reservoir Project

Tamil

Nadu

Medium 56.5 2010

539.   

         

 

28th 24.09.1984 Kundghat Reservoir Scheme Bihar Medium 56.004

540.   

         

 

28th 24.09.1984 Shivna Takli Project Maharas

htra

Medium 13.187

541.   

         

 

28th 24.09.1984 Gopad Lift Irrigation Scheme Madhya

Pradesh

Medium 34.376

542.   

         

 

28th 24.09.1984 Mahuar Irrigation project Madhya

Pradesh

Medium 18.67

543.   

         

 

28th 24.09.1984 North-Mand Medium Irrigation Project Maharas

htra

Medium 67.059

544.   

         

 

28th 24.09.1984 Tarali Medium Irrigation Project Maharas

htra

Medium 14.074

545.   

         

 

28th 24.09.1984 Dehali Medium Irrigation Project Maharas

htra

Medium 9.827

546.   

         

 

28th 24.09.1984 Protecdtion works for Kosi Flood

Embankment

BIHAR FC 5.915

547.   

         

 

29th 26.2.1985 Tehri Dam Project Uttar

Pradesh

Major 1605.86

548.   

         

 

For Protection of Palasbari and Gumi

(Kandalpara) area from the eresion of

River Brahmaputra

Assam FC 10.276

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n549.   

         

 

30th Regardeig discussion on Approch

Doucument for the 7th Plan. (Clearance

of New /R.E/ Unapproved Project taken

up by the State Govts./ integrated

development of Catchment and Comm

land aareas/Review of the Procedure

and time limit for examination of the

Sch

550.   

         

 

30th 19.07.1985 Lower Damoder Drainage Scheme West

Bengal

FC 14.4

551.   

         

 

31st 25.07.1985 Karatia Nagartala Basin Drainage

Scheme

West

Bengal

FC O6.56

552.   

         

 

31st 25.07.1985 Sri Ram Sagar Irrigation Andhra

Pradesh

Major 87.002

553.   

         

 

32ND 28.11.1985 Sutlej-Yamuna Link Canal Punjab Major 272

554.   

         

 

32nd 28.11.1985 Shivna Takli Medium irrigation Project Maharas

htra

Medium 12.9969

555.   

         

 

32nd 28.11.1985 Barcharanla irrigation Project Madhya

Pradesh

Medium 7.54

556.   

         

 

32nd 28.11.1985 KenharGaon Tank irrigation Project Madhya

Pradesh

Medium 8.6467

557.   

         

 

32nd 28.11.1985 DEhali irrigation Project (REVD). Maharas

htra

Medium 9.8275

558.   

         

 

32nd 28.11.1985 Sankh irrigation Project Maharas

htra

Medium 7.1724

559.   

         

 

32nd 28.11.1985 Sepnal irrigation Project Maharas

htra

Medium 6.9257

560.   

         

 

32nd 28.11.1985 Meja Modernisation and Meja Feeder Rajastha

n

Medium 42.217

561.   

         

 

32nd 28.11.1985 Javapur Tower Projection works Uttar

Pradesh

F.C. 23.93

562.   

         

 

33RD 21.3.1986 Kanpur irrigation Project Uttar

Pradesh

Major 86.03

563.   

         

 

33rd 21.3.1986 Gyanpur Pump Canal Project Uttar

Pradesh

Major 73.3885 6541533rd

564.   

         

 

33rd 21.3.1986 Watrak Reservoir Project Gujarat Major 22

563.   

         

 

33rd 21.3.1986 Indira Gandhi Nahar Project Stage II Rajastha

n

Major 943.24

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n564.   

         

 

33rd 21.3.1986 Raising Meja Dam Uttar

Pradesh

Major 29.69

565 33rd 21.3.1986 Rengali Multipurpose Project (REVD) Orissa M.P. 196.39

566 33RD 21.3.1986 Srisailam Rignt Bank Canal Project

(REVD).

Andhra

Pradesh

Major 386.05

567 33rd 21.3.1986 Potterv irrigation Project (REVD) ORISSA Major 69.74

568 33rd 21.3.1986 Singda Dam Project Manipur Medium 19.89

569 34th 13/14/15.5.1

986

Punjab irrigation Project-Phase II Punjab Major 452.57

570 34th 13/14/15/.5.

1986Loictak Lift irrigation Scheme (2

nd

REVD)

Manipur Major 24.4

571 34th 13/14/15.5.1

986

Modified Som Kamla Amba irrigation

Project

Rajastha

n

Major 58.01

572 34th 13/14/15.5.1

986

Saryu Pump Canal Uttar

Pradesh

Major 8.25

573 34th 13/14/15.5.1

986

Exacavation of Right Side Channel

Above Sathhnur Pick-UP Aniwt

Tamil

Nadu

Major 4.05

574 34th 13/14/15.5.1

986Khoupam Dam Project (2

nd REVD.) Manipur Major 2.98

575 34th 13/14/15.5.1

986

Paimar irrigation Scheme (REVD) Bihar Major 2.69

576 34th 13/14/15.5.1

986Phulwaria Reservoir (2

nd REVD) Bihar Major 31.37

577 34th 13/14/15.5.1

986Udarasthan irrigation Scheme (1

st

REVD).

Bihar Major 4.4

578 34th 13/14/15.5.1

986

Parambikulam Aaliyar Project Tamil

Nadu

Major 84.9

579 34th 13/14/15.5.1

896

Ruphi irrigation Scheme (REVD) Assam Major 4.95

580 34th 13/11/15.5.1

896

Masalga Medium irrigation Project. Maharas

htra

Medium 4.63

581 34th 13/11/15.5.1

896

Modernisation of Ananthnar Channel Tamil

Nadu

Medium 3.48

582 34th 13/11/15.5.1

896

Dekodong irrigation Scheme (REVD). Assam Medium 4.6

583 34th 13/11/15.5.1

896

Kusoi irrigation Project Orissa Medium 27.03

584 34th 13/11/15.5.1

896

Ghaken irrigation Project Rajastha

n

Medium 4.04

585 34th 13/11/15.5.1

896

Morna (Guroghar) irrigation Project Maharas

htra

Medium 9.42

586 34th 13/11/15.5.1

986

Kar River Medium Project Maharas

htra

Medium 8.02

587 34th 13/11/15.5.1

986

Som Kagdar irrigation Project (REVD). Rajastha

n

Medium 17.5

588 34th 13/11/15.5.1

986

Jam River Medium Project Maharas

htra

Medium 11.75

589 34th 13/14/15.5.1

986

Chavli irrigation Project. Bihar Medium 8.71

590 34th 13/14/15.5.1

986

Khudin Reservoir Cum Modernisation

Project.

Bihar Medium 5.07

591 34th 13/14/15.5.1

986.Kaliaber Lift irrigation Scheme (2

nd

REVD)

Assam Medium 8.51

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n592 34

th 13/14/15.5.1

986

Bhavour Sahib Lift irrigation Scheme-PH

II

Himacha

l

Medium 4.26

593 34th 13/14/15.5.1

986

Darjane irrigation Project (REVD). Orissa Medium 9.09

594 34th 13/14/15.5.1

986

Adhwara Flood Control Scheme-PH-I Bihar F.C. 17.22

595 34th 13/14/15.5.1

986

Drainage Scheme for Bhagwanpur-

Nandigram Area.

West

Bengal

F.C. 3

596 34TH 13/14/15.5.1

986

Increasing Capacim of Najafgarm Drain

from Dhansa Bund To Bharat Nagar

Bridge

Delhi F.C. 37.11

597 35TH 15/16/10.19

86

u.p.Composite irrigation Project-

Modernisation of upper Ganga Canaal

Uttar

Pradesh

Major 251

598 35th 15/16/10.19

86

Hippargi irrigation Project Karnatak

a

Major 186.7

599 35th 15/16/10.19

86

Kanupur irrigation Scheme Orissa Major 86.03

600 35th 15/16/10.19

86

Northend irrigation Project Maharas

htra

Medium 6.71

601 35th 15/16/10.19

86

Karamuzha Lift irrigation Scheme Assam Medium 9.86

602 35th 15/16/10.19

86

Protection of Mukulmua (Howlighat)

And ITS Adjoining Area From Erosion of

The Brahamapuira

Assam Flood

Control

5.18

603 35th 15/16/10.19

86

Anti-Erosion Scheme for Protection of

Bokakhat And Kaziranga Area

(Moribholla) from Erosion of The

Bizahmaputra

Assam Flood

Control

10.46

604 35th 15/16/10.19

86

Karatia Nagartala Basin Drainage

Scheme in The District of 24 Pargonos

West

Bengal

Flood

Control

6.56

605 35th 15/16/10.19

86

Haroagong-Kultigong Basin Drainage

Scheme (Sunti Basin) Phase-I In District

Barasat

West

Bengal

Flood

Control

7.73

606 35th 15/16/10.19

86

Scheme for Construction of Marginal

Embankment on Bcth Banks of River

Ami from Kauriram To Gorakhpur-Khaini

Road in Gorakhpur District

Uttar

Pradesh

Flood

Control

4.53

33 Irrigation Schemes In Advanced

Stages of Constrvction Listed Down

Separately & Attached.

2429

1433 2000

7692

607 R.E. on Batane Reservoir scheme . Bihar Major 18.5579

608 R.E. on Sajnam Dam Project. Uttar

Pradesh

Major 1266

609 R.E. on Kangsabati Reservoir Project. West

Bengal

Major 10016

610 Revised Estimate of Kosi Irrog. Scheme. Uttar

Pradesh

Major 1732.31

611 R.E. of Manjra Irrgn. Project Maharas

htra

Major 3160.47

612 R.E. of Thandava Reservoir Project Andhra

Pradesh

Major 1519.11

35TH 15/16/10.19

86

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n613 R.E. on Sir Arthur Cotton Barrage

Project (Godavari Barrage Project)

Andhra

Pradesh

Major 8602

614 Revised Estimated of Augasi Pump

Canal

Uttar

Pradesh

Major 3.27

615 R.E. on Aliganj Sinchai Pariyojna Uttar

Pradesh

Major 696

616 R.E. of Baigul Reservoir Scheme Uttar

Pradesh

Major 718

617 R.E. on adwa dam Project Uttar

Pradesh

Major 766.3

618 Suheli Irrigation Scheme Uttar

Pradesh

Major 640

619 Modhotande Irrigation Project Uttar

Pradesh

Major 280.46

620 R.E. of Bhimgoda Barrage Project Uttar

Pradesh

Major 3302

621 Khatima Irrigation Scheme Uttar

Pradesh

Major 217.57

622 Second Revised Estimate of

Chitturpuzha Irrigation Project

Kerala Major 1763.71

623 Increasing Capacity of the Bipipur lake Haryana Major 149.07

624 R. E. on Jaipur Reservoir Scheme Bihar Medium 262.75

625 R.E. of Lorgara Reservoir Scheme Bihar Medium 198.88

626 R.E. on Rohini Dam Project Uttar

Pradesh

Medium 3316

627 R.E. of Murahir Reservoir scheme Bihar Medium 703.84

628 R.E. of Ganga Pump Canal Scheme at

Chausa

Bihar Medium 591

629 R.E. of Tapkara Reservoir Bihar Medium 400.5

630 R.E. of Srajgarha Pump Canal Scheme Bihar Medium 427.51

631 R.E. of Latratu Reservoir scheme Bihar Medium 2523.9

632 R.E. of the Sakrigal Pump Canal scheme Bihar Medium 307.5

633 R.E. of kakurjahap (Anjan) Rescrvoir

Scheme

Bihar Medium 2102.43

634 R.E. of the Torlow Reservoir Scheme Bihar Medium 1068.73

635 R.E. of Shah Nahar Feeder Project Punjab Medium 3345

636 Second Revised Estimate of Lethpora

Lift Irrigation Scheme

Jammu

&

Medium 4.76 2429 10.04.1976

637 R.E. of the Rajal Lift Irrigation Scheme Jammu

&

Medium 5.5748 1433

638 R.E. of Ranjan Lift Irrigation Scheme Jammu

&

Medium 6.31 2000

35TH 15/16/10.19

86

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n639 2

nd Revised Estimate of the Marval Lift

Irrigation Scheme

Jammu

&

Medium 7.17 7692 20.03.1978

640 36th

Meeti

ng

8.12.1986 Indira Gandi Naher Project Stage II

Revised

Rajastha

n

Major 13.31

641 36th 8.12.1986 Man Irrigation Project Madhya

Pradesh

Major 44.1

642 36th 8.12.1986 Kanhar Irrigation Project Uttar

Pradesh

Major 107.44

643 36th 8.12.1986 Lohoru Canal life Irrigation Scheme Haryana Major 34.53

644 36th 8.12.1986 Phoba Pump Canel Scheme Uttar

Pradesh

Medium 3.498

645 36th 8.12.1986 Protection Works for Kosi Flood

Embankment

Bihar F.C. 16.92

646 37th

Meeti

ng

22.6.1987 Srisailam Right Bronch Canal Andhra

Pradesh

Major 386.05,23.52

647 37th 22.6.1987 Remedial Measures on Cracks in

Hirekud Dam

Orissa Major 8.33

648 37th 22.6.1987 Resteretion of downstram and upstream

Flexible Protection and upstream divicle

wells of Kosi Project

Bihar Major 12.43

649 37th 22.6.1987 Warm Irrigation Project Maharas

htra

Major 331.36

650 37th 22.6.1987 Revised Estimate of kaldiye Irrigation

Scheme

Assam Medium 8.11

651 37th 22.6.1987 Revised Estimate of Gunta Dom Project Uttar

Pradesh

Medium 7.92

652 37th 22.6.1987 Protections Works for Kosi Embankment Bihar F.C. 16.92

653 37th 22.6.1987 Anti-eroisoon works and retired en-bank

ment from O TO 35 in Piprasi-Pipraghet

reach on right Bank of Gondok.

Bihar F.C. 17.6

654 38th 27.1.1988 Integreted Project for development of

water legged areas of South Weotem

districts of Panjab.

Punjab New

Major

50.87

655 38th 27.1.1988 Punjab Irrigetion Project Phase-II-

Lining of Water Course

West

Bengal

Major Alt-I-

226.33,Alt-II-

215.61656 38

th 27.1.1988 Moderaination of Kongsaboti Project West

Bengal

Major 311.07

657 38th 27.1.1988 Gosi Khurd Project Maharas

htra

Major 461.19

658 38th 27.1.1988 Hathnikund Barrage Project Haryana Major 42.37

659 38th 27.1.1988 SYL Canal Part-IMain Canal Punjab Revised

Major

366

660 38th 27.1.1988 Mahenedi Barrage Orissa Revised

Major

42.058

661 38th 27.1.1988 Upper Krishna Project Stage-I Karnatak

a

Revised

Major

1249.15

662 38th 27.1.1988 Vath vagv Medium Irrigation Project Andhra

Pradesh

Revised

Medium

28.7075

35TH 15/16/10.19

86

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n663 38

th 27.1.1988 Madhav lose irrigation Project Andhra

Pradesh

Revised

Medium

38.89

664 38th 27.1.1988 Andhre irrigation Project Andhra

Pradesh

Revised

Medium

13.1256

665 38th 27.1.1988 Raghurare Irrigation Scheme Assam Revised

Medium

26.8464

666 38th 27.1.1988 Hatwane Project Maharas

htra

Revised

Medium

45.87

667 38th 27.1.1988 Imphal Barrage Project. Manipur Revised

Major

6.3368

668 38th 27.1.1988 Sunder Irrigation Project Orissa Revised

Major

8.2067

669 38th 27.1.1988 Vengalareva Sengram Project Andhra

Pradesh

Revised

Major

23.8015

670 38th 27.1.1988 Project Estimate of flood Preventoin

works at Allahabed Phase-II

Uttar

Pradesh

F.C. 6

671 38th 27.1.1988 Sitapar Town Flood Protection Scheme Uttar

Pradesh

F.C. 6.01

672 38th 27.1.1988 Lower Damadar Drainage Scheme West

Bengal

F.C. 14.4

673 39th

Meeti

ng

12.4.1988 Raising lining of Bhakra Main line to

restore it, authensed Capacity

Punjab New

Major

82.725

674 39th 12.4.1988 Supdementary note on GosiKhurd

Irrigation Project

Maharas

htra

Major 461.19

675 39th 12.1.1988 Iurela Project Andhra

Pradesh

Major 204.75

676 39th 12.1.1988 Karanya Project Karnatak

a

Major 98

677 39th 12.1.1988 Telugu Genge Project Andhra

Pradesh

Major 834.49

678 39th 12.1.1988 Nauargeon Tank Project Maharas

htra

New

Medium

5.2603

679 39th 12.1.1988 Bah Irrigation Project Madhya

Pradesh

Medium 29.92

680 39th 12.1.1988 Birupe Genguti Island Project Orissa Medium 4.6302

681 39th 12.1.1988 Benetura Irrigation Project Maharas

htra

Medium 4.0-137

682 39th 12.1.1988 Dnged Irrigation Project Maharas

htra

Medium 4.636

683 39th 12.1.1988 Upper Maner Project Maharas

htra

Medim 26.18342

684 39th 12.1.1988 Varadragasawani Guddi Project Andhra

Pradesh

Medium 13.9667

685 39th 12.1.1988 Supplenentery Note on Baghlati

Irrigation Project

Orissa Medium 12.4922

686 39th 12.1.1988 Ragional Tra Irrigation Project (NEC) Medium 15.56

687 39th 12.1.1988 Revised Estimate of Gumti Irrigation

Project

Tripura Revised

Medium

19.35

688 40th 17.8.1988 Warna Irrigation Project Maharas

htra

New

Major

337.81

689 40th 17.8.1988 Modernisation of UKni Sujhat Major 60.13

690 40th 17.8.1988 Bihar Major 110.76

691 40th 17.8.1988 Drainage Scheme in the Irrigation

Commenda of Gendek and Koel Project

in North Bihar

Bihar Major 42.3906

692 40th 17.8.1988 Dudhgange Project Maharas

htra

Major 204.5837

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n693 40

th 17.8.1988 Indira Gandhi Feeder Gang Canal link

Chennal

Rajastha

n

Major 17.64

694 40th 17.8.1988 Rena Pur Maharas

htra

New

Medium

7.3606

695 40th 17.8.1988 Kundghat Reservior Project Bihar Medium 5.6004

696 40th 17.8.1988 Champamati Assam Revised

Major

47.4902

697 40th 17.8.1988 Sardar sarovar Project Gujarat Major 6406.04

698 40th 17.8.1988 Sriram Sagar Stage-I Andhra

Pradesh

Major 9.0027

699 40th 17.8.1988 SYL Canal Project Part-I Punjab Major 429.77

700 40th 17.8.1988 Cheyyeru Irrigation Project Andhra

Pradesh

Revised

Medium

28.07287

701 40th 17.8.1988 Protection of Balasbari and Guni area

from eraision of river Brahmaputra.

Assam F.C. 15.3

702 41st

Meeti

ng

25.10.1988 Vamsadhora Project Stege II Andhra

Pradesh

New

Major/Mul

ti Purfose

275.74

703 41st 25.10.1988 Pench Diverion Project Madhya

Pradesh

184.04

704 41st 25.10.1988 Onkorashwar Multi Purpose Project Madhya

Pradesh

788.03

705 41st 25.10.1988 Bhotoa Irrigation Project Maharas

htra

164.11

706 41st 25.10.1988 Modernisation of Dartiwada Resevoir Gujarat 34.8801

707 41st 25.10.1988 Modernisation of fakwedi Canal System Gujarat 24.7653

708 41st 25.10.1988 SYL Canal Part-III Punjab 48.12

709 41st 25.10.1988 Singur Project Andhra

Pradesh

104.36

710 41st 25.10.1988 Deo Irrigation Project Orissa 40.76

711 41st 25.10.1988 Rukura Irrigation Project Orissa 15.17

712 41st 25.10.1988 Iayakwadi Stage-I Maharas

htra

Revised

Major/Mul

ti Purpose

185.43

713 41st 25.10.1988 Tehrio Dam Project Uttar

Pradesh

131350

714 41st 25.10.1988 Westrn Kosi Canal (India Partion) Bihar 326.6124

715 41st 25.10.1988 Panchkhero Reservoir Project Bihar Revised

Medium

9.549

716 42nd

Meeti

ng

11.1.1989 Modernisation of Shotrining Irrigation

Scheme

Gujarat New

Major/Mul

ti Purpose

8.1

717 42nd 11.1.1989 Modernisation of Kharicut Canal System Gujarat 18.6

718 42nd 11.1.1989 Mahenadi Chibrot-Pale Island Irrigation

Project

Orissa 30.9337

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n719 42

nd 11.1.1989 Wan River Project Maharas

htra

46.85

720 42nd 11.1.1989 Kayna Krishna Lift Irrigation Scheme Maharas

htra

259.107

721 42nd 11.1.1989 Kurli Project Maharas

htra

2700

722 42nd 11.1.1989 Bargi Multi Purpose Project Madhya

Pradesh

566.34

723 42nd 11.1.1989 N Sager Project Madhya

Pradesh

1966.67

724 42nd 11.1.1989 Sub surface drainage in south Western

Distncts

Punjab k 10.01

725 42nd 11.1.1989 Bhairwar Reservoir Scheme Bihar 20.1885

726 42nd 11.1.1989 Bardikari Irrihgation Project Assam Revised

Major/

Multi

Prupose

22.1297

727 42nd 11.1.1989 Patter Irrigation Project Orissa 83.7

728 42nd 11.1.1989 Upper Krishna Project Stage-I Karnatak

a

1214.91

729 42nd 11.1.1989 Kansjore Reservoir Scheme Bihar Revised

Medium

20.908

730 43rd

Meeti

ng

18.5.1989 Arancvati River Project Maharas

htra

New

Major/

Multi

Purpose

66.48

731 43rd 18.5.1989 Bawanthadi Project Maharas

htra

161.575

732 43rd 18.5.1989 Sangola Brench Canal Maharas

htra

37.01

733 43rd 18.5.1989 Punjab Irrigation Project Phase-II lining

of Water Curese

Punjab 119.97

734 43rd 18.5.1989 Modermsatier of Couery Delte Phese-I Tamil

Nadu

78.8

735 43rd 18.5.1989 Tanrani Multi Purpose Dam Project Uttar

Pradesh

Revised

Major/

Multi

Purpose

144.84

736 43rd 18.5.1989 Sitapur Town Flood Protechen Scheme Uttar

Pradesh

F.C. 6.01

737 44th 22.9.1989 Rehabilitation and Irrigation of Canal

regulation structures in the Canal

system of Punjab,

Punjab New

Major/

Multi

Purpose

34.49

738 44th 22.9.1989 Lower Wunne Project Maharas

htra

87.55

739 44th 22.9.1989 Punad Irrigetion Project Maharas

htra

29.92

740 44th 22.9.1989 Sidhmukh Irrigation Project Rajastha

n

Major 103 86.209 09.07.1990

741 44th 22.9.1989 Nohor Irrigation Project Rajastha

n

Major 40.59 13.665 09.07.1990

742 44th 22.9.1989 Bargi Multi Purpose Project Madhya

Pradesh

566.34

743 44th 22.9.1989 Chunoni Irrigation Project Kerala 36.15

744 44th 22.9.1989 North Koel Reservoir Project Bihar Major 439 CCA-

124.27(Bihar

111.80 &

Jharkhand-

12.47)745 44

th 22.9.1989 Rangai Valley Irrigation Project Meghala

ya

New

Medium

16.3

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n746 44

th 22.9.1989 Punjab Irrigation Project Phase-II Lining

of Channels

Punjab 82.79

747 44th 22.9.1989 Extension & Impoovemant of Irrigation

of shah Nahar Canal

Punjab 95.25

748 44th 22.9.1989 Flood Prevention Works at Allahabad

Phase II-

Uttar

Pradesh

F.C. 6

749 45th Suhapat Irrigation Project Madhya

Pradesh

New

Medium

15.6

750 45th Kesha Reservoir Scheme Bihar 16.14

751 45th Rajiabad high lift Irrigation Scheme Jammu

&

10.6067

752 45th Dolaithabi Barrage Project Manipur 19.2

753 45th Jakham Irrigation Project Rajastha

n

Revised

Major/

Multi

Purpose

65.46

754 46th 21.12.1989 Tillari Irrigation Project Maharas

htra &

Major

(New)

217.22

755 46th 21.12.1989 MODERNISATION OF ZAINGIR Jammu

&

Medium 6.425

756 46th 21.12.1899 Moderamsation of Periyar-Valgal

Irrigation System Stage I & II ( REVD)

Tamil

Nadu

Major/Mul

ti

Purpose

99.72

757 47th 30.1.1990 Bewar Feeder Project (New) Uttar

Pradesh

Major/

Multi

Purpose

25.37

758 47th 30.1.1990 Modernisation of Zaingir Canal Project

(New)

Jammu

&

Medium 6.425

759 47th 30.1.1990 Salauli Irrigation Project (REVD) GOA Major 88.3

760 47th 30.1.1990 Warang Drainage Development Scheme Assam F.C. 4.9

761 48th 5.7.1990 Bansagar Canal Project (New) Uttar

Pradesh

Major/Mul

ti Purpose

190.27

762 48th 5.7.1990 Pagadiya Dam Project (New) Assam 287.86

763 49th 11.9.1990 Modernisation of Upper Ganga Canal

PH. I y Madya Ganga Canal (375 + 345

= 720)

Uttar

Pradesh

Major/

Multi

Purpose

720 (375-

Upper Ganga

x345 Madya

Ganga

764 49th 11.9.1990 Modernisation of Periyar Vahgni

Irrigation System Stage I x II

Tamil

Nadu

Major 124.72

765 49th 11.9.19990 Kartan Reservoir Project Gujarat Major 186.37

766 49th 11.9.1990 Dhulbaha Dam Project (REVD) Punjab Medium 21.13

767 49th 11.9.1990 Construction of Priority Works under

ghaggar flood control scheme

Rajastha

n

Flood

control

7.05

768 49th 11.9.1990 Beel balli drainage scheme West

Bengal

flood 2.148

769 49th 11.9.1990 Harang drainage development scheme Assam Flood 4.9

770 50th 20.3.1991 Hathnikund Barrage Project Haryana Major 72.89

771 50th 20.3.1991 Watrak Irrigation Project Gujarat Major 43.705

771.7 50th 20.3.1991 Thanwar Irrigation Project Madhya

Pradesh

Major 24.384

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n773 50

th 20.3.1991 Gyanpur pump canal Uttar

Pradesh

Major 110.51

773.6 50th 20.3.1991 Walan Medium Irrigation Scheme

(New)

Gujarat Medium 22.156

774.9 50th 20.3.1991 Uben Medum Irrigation Project Gujarat Medium 12.485

775.6 50th 20.3.1991 DEA Irrigation Project Orissa Medium 52.227

776.9 50th 20.3.1991 Modernistaion of Periyar-Vaigai

Irrigation system (Revd)

Tamil

Nadu

Major 124.72

778 50th 20.3.1991 Sutlej Yamuna Link Canal – Part I

(Revd)

Punjab Major 499.12

779 50th 20.3.1991 Macahu II Medium Irrigation Project

(Recd)

Gujarat Medium 37.76

780 50th 20.3.1991 Meja Modernisation and Meja Feeder

Project (Revd)

Rajastha

n

Medium 37.62

781 51st 4.12.1991 Protection of Mukalmna (Howlighat) and

its Adjoining Area From Erosion of

River Brahmaputra

Flood

Control

14.33

782 51st 4.12.1991 Anti- Erostion scheme for Protection of

Nagaghdoli Maijam area upstream of

Dibrugarh Rown Along River

Brahmapotra

Assam Flood

Control

10.74

783 51st 4.12.1991 PATHRAI Dam Project (New) Uttar

Pradesh

Medium 12.54

784 51st 4.12.1991 Deo Irrigation Project (New) Orissa Medium 52.227

785 51st 4.12.1991 Narmada Canal Project (New) Rajastha

n

Major 467.53

786 51st 4.12.1991 Jaismand Modernisation Project (New) Rajastha

n

Major 12.4

787 51st 4.12.1991 Modernisation of upper Ganga Canal PH-

I (New)

Uttar

Pradesh

Major 467.76

788 51st 4.12.1991 Vamsadhara Stage-II Project (New) Andhra

Pradesh

Major 275.74

789 51st 4.12.1991 Increasing Capacity of Deokali Pump

Canal (Recd)

Uttar

Pradesh

Major 35.24

790 51st 4.12.1991 Increasing Capacity of Narayanpur

Pump Canal (Revd)

Uttar

Pradesh

Major 52.02

791 51st 4.12.1991 Borolia Irrigation Scheme (Revd). Assam Medium 33.37

792 51st 4.12.1991 Balh Valley Irrigation Project (Revd). Himacha

l

Medium 8.22

793 52nd 28.4.1992 Kolar Project (New) Madhya

Pradesh

Major 139.14 60868

794 52nd 28.4.1992 Increasing Capacity of Zamania Pump

Canal (New)

Uttar

Pradesh

Major 39.812 50400 (31821

Additional)

795 52nd 28.4.1992 Bewar Feeder Project (New) Uttar

Pradesh

Major 27.97 63656 (9800

Additional )

796 52nd 28.4.1992 Karanja Irrigation Project (New) Karnatak

a

Major 98 48968

797 52nd 28.4.1992 Chauli Irrigation Project (New) Rajastha

n

Medium 28.87 8963

19.37 618652nd 28.4.1992 Mukteshwar Irrigation Project (New) MediumGujarat 798

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n799 52

nd 28.4.1992 RAVI Project Unit – I (Revd) Punjab Major 1652.08 348000

800 52nd 28.4.1992 Singda Dam Multi Purpose Project

(Revd)

Manipur Medium 34.3 4148

801 52nd 28.4.1992 Khuga Irrigation Project (Revd) Manipur Medium 67.7 14,755

802 53rd 08.12.1992 Kaulasnala Irrigation Project (Sanjay) Andhra

Pradesh

Medium 20.49 4,131 26.02.1993

803 53rd 08.12.1992 Maddileru Irrigation Project Andhra

Pradesh

Medium 28.56 5,213 26.02.1993

804 53rd 08.12.1992 Yerrakalava Irrigation Project Andhra

Pradesh

Medium 46.52 9,996 26.02.1993

805 53rd 08.12.1992 Subernarekha Multipurpose Project Bihar Major 1,428.82 2,36,846

806 53rd 08.12.1992 Bennithora Irrigation Project Karnatak

a

Major 73.25 21,854 23.02.1993

807 53rd 08.12.1992 Bargi Diversion Project Madhya

Pradesh

Major 1,101.23 3,76,514 06.07.1998

808 53rd 08.12.1992 Sindh River Project Phase-II Madhya

Pradesh

Major 510.94 1,62,100 17.03.1998

809 53rd 08.12.1992 Bethali Irrigation Project Rajastha

n

Medium 13.07 4,316 26.10.1998

810 53rd 08.12.1992 Gunta Dam Irrigation Project Uttar

Pradesh

Medium 18.41 3,878 18.06.1997

811 54th 26.03.1993 Yeleru Reservoir Project Andhra

Pradesh

Major 335.34 27,360

812 54th 26.03.1993 Buggavanka Irrigation Project Andhra

Pradesh

Medium 25.96 5,200 29.07.1993

813 54th 26.03.1993 Sanjay Sagar Irrigation Project Madhya

Pradesh

Medium 39.13 8,052

814 54th 26.03.1993 Kanupur Irrigation Project Orissa Major 268.65 47,709

815 54th 26.03.1993 Naraj Barrage Project Orissa Major 125.74 2,93,318 06.08.1993

816 54th 26.03.1993 Manjore Irrigation Project Orissa Medium 37.7 10,433

817 54th 26.03.1993 Titilagarh Irrigation Project Orissa Medium 21.13 2,950 21.10.1993

818 54th 26.03.1993 Bisalpur Drinking Water and Irr. Project Rajastha

n

Major 309.07 49,890 16.12.1997

819 54th 26.03.1993 Somkagdar Irrigation Project (Revised) Rajastha

n

Medium 22.3 5,739 27.09.1993

820 54th 26.03.1993 Raising Meza Dam Uttar

Pradesh

Major 52.18 17,879

821 55th 27.08.1993 Chelamelavagu Irrigation Project Andhra

Pradesh

Medium 22.99 2,632 02.05.1994

822 55th 27.08.1993 Auranga Reservoir Project (Revised) Bihar Major 297.81 55,420

6,661 (Org.)

2,138 (Add.)

824 55th 27.08.1993 Providing Hydroplus Fusegate on

Wanakbori Weir

Gujarat Major 8.58 2,62,694 07.02.1994

825 55th 27.08.1993 Rajghat Canal Project Madhya

Pradesh

Major 309.21 1,21,450

826 55th 27.08.1993 Sako Irrigation Project Maharas

htra

Medium 10.88 2,064

55th 27.08.1993 Mod. of Machhu-I Irrigation Scheme Gujarat Major 8.12823

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n827 55

th 27.08.1993 Subernarekha Irrigation Project Orissa Major 790.32 1,87,462 28.12.1995

828 55th 27.08.1993 Rukura Irrigation Project Orissa Medium 25.22 7,648 01.06.2009

829 55th 27.08.1993 Manu Irrigation Project (Revised) Tripura Medium 33.28 7,560

830 55th 27.08.1993 Urmil Dam Project Uttar

Pradesh

Medium 29.45 4,769

831 55th 27.08.1993 Mod. of Kangsabati Reservoir West

Bengal

Major 329.07 3,02,925

832 56th 10.11.1993 Birupa Genguti Island Irrigation Scheme

(Revised)

Andhra

Pradesh

Medium 11.46 8,086

833 56th 10.11.1993 Palemvage Irrigation Project Andhra

Pradesh

Medium 29.13 6,230 17.03.2006

834 56th 10.11.1993 Pedderu Reservoir Project Andhra

Pradesh

Medium 26.23 6,460

835 56th 10.11.1993 Dhansiri Irrigation Project (Revised) Assam Major 158.32 83,366

836 56th 10.11.1993 Mod. of Sone Canal Bihar Major 235.93 48,600 07.07.1998

837 56th 10.11.1993 Omkareshwar Multipurpose Project Madhya

Pradesh

Major 1,784.29 2,83,320 15.05.2001

838 56th 10.11.1993 Chandraprabha Irrigation Project Maharas

htra

Medium 35.3 8,135

839 56th 10.11.1993 Masalaaga Irrigation Project Maharas

htra

Medium 10.51 2,080

840 56th 10.11.1993 Pentakli Tank Project Maharas

htra

Medium 31.41 9,505

841 56th 10.11.1993 Upper Colab Irr. Project (Revised) Orissa Major 204.78 8,750

842 56th 10.11.1993 Eastern Ganga Canal (Revised) Uttar

Pradesh

Major 258.48 1,05,000

843 56th 10.11.1993 Madhya Ganga Canal Uttar

Pradesh

Major 448.19 1,78,000

844 56th 10.11.1993 Rajghat Canal Project Uttar

Pradesh

Major 126.43 1,38,660 23.03.2001

845 57th 27.01.1994 Sutlej Yamuna Link Canal Haryana Major 61.76 4,46,000

846 57th 27.01.1994 Bansagar Canal Project Madhya

Pradesh

Major 344.66 2,49,359 29.11.2001

847 57th 27.01.1994 Benetura Irrigation Project Maharas

htra

Medium 12.12 2,548 25.02.1997

848 57th 27.01.1994 Raigavan Irrigation Project Maharas

htra

Medium 9.51 1,700

849 57th 27.01.1994 Bansagar Canal Project Uttar

Pradesh

Major 190.27 1,50,132

850 57th 27.01.1994 Western Gandak Canal (Revised) Uttar

Pradesh

Major 154.38 3,32,000

851 57th 27.01.1994 Providing Kharif Channel in Hindon

Krishni Doab

Uttar

Pradesh

Medium 15.53 3,000 06.07.1995

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n852 58

th 24.06.1994 Srisailam Right branch Canal Project

(Revised)

Andhra

Pradesh

Major 1,185.58 1,00,870

853 58th 24.06.1994 Idamalayar Irrigation Project Kerala Major 107 27,513

854 58th 24.06.1994 Tembhapuri Project Maharas

htra

Medium 18.09 4,784 13.07.1995

855 58th 24.06.1994 Sapua Badajore (Revised) Orissa Medium 33.21 3,752

856 58th 24.06.1994 Satlej Yamuna Link Canal Punjab Major 601.25

857 58th 24.06.1994 Lining of Channels in Bundelkhand and

Baghelkhand Regions

Uttar

Pradesh

Major 57.37 23,778

858 59th 16.12.1994 Haryana Water Resources Consolidation

Project

Haryana Major 1,442.12 1,3,000 (Add.) 22.12.1995

859 59th 16.12.1994 Bordahegaon Irrigation Project Maharas

htra

Medium 16.27 2,218 10.11.1997

860 60th 18.05.1995 Sriram Sagar Project- Stage-I (Rev. Andhra

Pradesh

Major 1,519.15 59,59,000

861 60th 18.05.1995 Tamil Nadu WRC Project Tamil

Nadu

Major 807.49 19.05.1995

862 61st 22.05.1995 Integrated Kallong Irrigation Scheme

(Rev.)

Assam Major 80.55 34,400

863 62nd 25.08.1995 Pagladiya Dam Project (Multipurpose) Assam Major 542.9 54,290/3MW 03.01.2001

864 62nd 25.08.1995 Tipaimukh Dam Project (Multipurpose) Manipur/

Mizoram

Major 2,899.00 -/1,500 MW

865 62nd 25.08.1995 Orissa Water Resources Consolidation

Project

Orissa Major 977 27.09.1995

866 62nd 25.08.1995 Chakan Irrigation Project Rajastha

n

Medium 9.55 3,377

867 63rd 25.01.1996 Flood Protection of Barauni-Begusarai

Complex

Bihar Major 6.2396 -

868 64th 03.04.1996 Bhima Lift Irrigation Andhra

Pradesh

Major 744 83,779 18.12.2007

869 64th 03.04.1996 Flood Clow Canal project from SRSP

(High Level Canal Project)

Andhra

Pradesh

Major 1,331.30 1,02,000 08.12.2005

870 64th 03.04.1996 Krishna Delta Modernisation including

Pulichintala Dam Project

Andhra

Pradesh

Major 1,165.36 5,75,000

871 64th 03.04.1996 Sriram Sagar Project Stage-II Andhra

Pradesh

Major 697.7 2,53,400

872 64th 03.04.1996 Shah Nahar Irrigation Project Himacha

l

Pradesh

Major 143.32 24,760 21.02.1997

873 64th 03.04.1996 Gararda Irrigation Project Rajastha

n

Medium 39.51 9,215

874 65th 14.06.1996 K.C.Canal Mod. Project Andhra

Pradesh

Major 674.29 1,10,482 16.4.1998

875 65th 14.06.1996 Regali Irrigation Sub Project LBC-II Orissa Major 705.15 1,77,651 14.07.1997

876 65th 14.06.1996 Indira Gandhi Nahar Project Stage-I Rajastha

n

Major 121.92 5,57,600

877 65th 14.06.1996 Indira Gandhi Nahar Project Stage-II Rajastha

n

Major 1,398.91 8,59,115 11.03.1998

878 65th 14.06.1996 Pathrai Irrigation Project (Revised) Uttar

Pradesh

Medium 31.66 2,998

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n879 66

th 04.02.1997 Mod. of Jamuna Irrigation project Assam Major 60.27 28,286 17.12.1997

880 66th 04.02.1997 Goma Irrigation Project Gujarat Medium 47.59 7,039 30.12.1997

881 66th 04.02.1997 Upper Beda Irrigation Project Madhya

Pradesh

Medium 89.52 13,365 10.09.1998

882 66th 04.02.1997 Lower Indra Irrigation Orissa Major 211.7 38,870 04.02.1999

883 66th 04.02.1997 Lower Suktel Irrigation Project Orissa Major 217.13 29,845 25.06.1999

884 66th 04.02.1997 Subernarekha Irrigation Project

(Revised)

Orissa Major 1,013.68 187462

885 66th 04.02.1997 Bandisendra Irrigation Project Rajastha

n

Medium 13.04 4,091 10.12.1997

886 66th 04.02.1997 Sukli Irrigation Project Rajastha

n

Medium 18.698 3,889 10.12.1997

887 66th 04.02.1997 Chittaurgarh Reservoir Project Uttar

Pradesh

Major 34.06 16,098

888 67th 09.09.1997 Buridehang Lift Irrigation Scheme Assam Medium 17.27 5,054

889 67th 09.09.1997 Hawaipur Lift Irrigation Scheme Assam Medium 14.93 3,887

890 67th 09.09.1997 Bhabour Sahib Lift Irrigation Project

Phase-II (Revised)

Himacha

l

Pradesh

Medium 11.42 3,432

891 67th 09.09.1997 Sidhatha Irrigation Project Himacha

l

Pradesh

Medium 33.62 3,150 02.02.2000

892 67th 09.09.1997 Mod. of Ranbir Canal Jammu

&

Major 84.4 49,418 21.05.1998

893 67th 09.09.1997 Thoubhal Irrigation Project (Revised) Manipur Major 254 33,400

894 67th 09.09.1997 Jarauli Pump Canal Project Uttar

Pradesh

Major 47.92 39,748 (Addl.) 23.03.1998

895 67th 09.09.1997 Maudaha Dam Project Uttar

Pradesh

Major 117.23 28,234

896 68th 12.06.1998 Chagalnadu Lift Irrigation Project Andhra

Pradesh

Major 43.05 14,165 19.02.2001

897 68th 12.06.1998 Burisuti Irrigation Project Assam Medium 34.7 11,500

898 68th 12.06.1998 Talamba Irrigation Project Maharas

htra

Major 289.09 28,900

899 68th 12.06.1998 Kar Medium Project Maharas

htra

Medium 44.71 6,359

900 68th 12.06.1998 Rengali Irrigation Sub-Project RBC (0-

112) (Revised)

Orissa Major 738.27 1,70,850 17.11.1998

901 68th 12.06.1998 Dhauragoth Irrigation Project Orissa Medium 16.8 3,010

902 68th 12.06.1998 Providing Kharif Channel in Hindon

Krishni Doab (Revised)

Uttar

Pradesh

Major 39.24 11,600 07.12.2000

903 69th 06.10.1998 Priyadarshini Jurala Project Andhra

Pradesh

Major 545.82 47.835

904 69th 06.10.1998 Balh Valley Irrigation Project Himacha

l

Pradesh

Medium 12.02 3,037 -

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n905 69

th 06.10.1998 Dzuza Medium Irrigation Project Nagalan

d

Medium 75.2 11,500 10.07.2009

906 70th 27.01.1999 Gumani Barrage Project (Revised) Bihar Major 85.55 16,194

907 70th 27.01.1999 Punasi Reservoir Jharkhan

d

Major 221.65 24,292

908 70th 27.01.1999 Siktia (Ajoy) Barrage Project Jharkhan

d

Major 248.1 40,509

909 70th 27.01.1999 Lift Irrigation in Changer Area Himacha

l

Pradesh

Medium 28.37 3,041 29.02.2000

910 70th 27.01.1999 Jam Medium Project Maharas

htra

Medium 42.63 5,474

911 70th 27.01.1999 Upper Indravati Irr. (Extn.) Project Orissa Major 136.67 41,794 18.03.2003

912 71st 03.08.1999 Upper Kiul Reservoir Project (Revised) Bihar Major 106.53 19,000

913 71st 03.08.1999 Utwali Irrigation Project Maharas

htra

Medium 35.78 5,394 02.12.2004

914 71st 03.08.1999 Supplementary Note on Jiri Irr. Project Manipur Medium 48.68 9,775

915 71st 03.08.1999 Upper Kolab Irrigation Project –

Extension of Ayacut at 14.3 Km of

Jeypore Main Canal (Nawarangpur

Branch Canal)

Orissa Major 71.66 19,283

916 71st 03.08.1999 Ret Irrigation Project Orissa Medium 86.14 9,775 17.10.2003

917 71st 03.08.1999 Telengiri Irrigation Project Orissa Medium 106.18 13,829 25.02.2003

918 71st 03.08.1999 Kandi Canal Extension from Hoshiarpur

to Balchur

Punjab Major 147.12 23,326 05.04.2002

919 71st 03.08.1999 Food Protection/ Diversion Scheme of

Kota City – Phase-I

Rajastha

n

Major 19.75 -

920 71st 03.08.1999 Mod. Project of Ghaggar Flood Control Rajastha

n

Major 101.69 -

921 72nd 18.01.2000 Suram Palem Reservoir Scheme Andhra

Pradesh

Medium 46.7 6,205

922 72nd 18.01.2000 Yerravagu Irrigation Project Andhra

Pradesh

Medium 31.28 4,453

923 72nd 18.01.2000 Pagladiya Dam Project Assam Major 542.9 54,160/3MW 03.01.2001

924 72nd 18.01.2000 Bateshwarsthan Ganga Pump Canal

Scheme (Phase-I)

Bihar Major 212 27,603

925 72nd 18.01.2000 Durgawati Reservoir Project Bihar Major 234.41 36,421

926 72nd 18.01.2000 Western Kosi Canal Project- Revised Bihar Major 884.6 2.33 Lakh

927 72nd 18.01.2000 Renuka Dam Project Himacha

l

Pradesh

Major 1,224.64 Drinking Water

to Delhi=542.5

CM/40MW

928 72nd 18.01.2000 Swan River Reservoir Scheme (Flood

Protection Works)

Himacha

l

Pradesh

Major 102.72 N.A. 30.03.2001

929 72nd 18.01.2000 Remodelling of Channels of UBDC

System

Punjab Major 177.8 54,300 13.12.2000

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n930 72

nd 18.01.2000 Eastern Yamuna Link Channel Uttar

Pradesh

Major 22.44 Supplementati

on to the

existing

system EYC –

3,09,698 H.K.

Doab-31, 420

17.09.2001

931 72nd 18.01.2000 Saryu Nahar Pariyojana Uttar

Pradesh

Major 2,765.16 14.04 Lakh

932 73rd 31.06.2000 Vamsadhara Project Phase-I of Stage-II

(Right Main Canal)

Andhra

Pradesh

Major 123.936 25,203 02.01.2002

933 73rd 31.06.2000 Peddavagu Project (Komaram Bhim) Andhra

Pradesh

Medium 202.59 10,927 23.03.2007

934 73rd 31.06.2000 Sudhavagu Irrigation Project Andhra

Pradesh

Medium 56.48 5,666

935 73rd 31.06.2000 Tilaiya Dhadhar Diversion Project Bihar Major 220.11 31,700

936 73rd 31.06.2000 Upper Krishna Stage-II Multipurpose

Project (Irrigation Portion)

Karnatak

a

Major 2,358.86 227000 13.12.2000

937 73rd 31.06.2000 Kanupur Irrigation Project Orissa Major 428.32 47,709 16.09.2002

938 73rd 31.06.2000 Samakoi Barrage Irrigation Project Orissa Medium 43.85 10,906

939 73rd 31.06.2000 Upper Lanth Irrigation Project Orissa Medium 48.99 6105/210MW

940 73rd 31.06.2000 Mod. of Gang Canal Rajastha

n

Major 445.79 48,192 29.09.2000

941 74th 20.09.2000 Valligallu Reservoir Andhra

Pradesh

Medium 143.67 10525 Drinking

Water

Provision 2.23

MCM

22.12.2006

942 74th 20.09.2000 Western Yamuna Link Channel Haryana Major 33.98 Link Channel

943 74th 20.09.2000 Improvement to Salki Irrigation Project Orissa Major 11.57 20,141

944 74th 20.09.2000 Improvement to Sason Canal System Orissa Major 34.92 (28.96

for Irrigation)

26051 29.07.2002

945 74th 20.09.2000 Ong Dam Project Orissa Major 304.66 34,500

3,120

Drinking Water

Provision to –

Town-31.54

MCMRural-0.73

MCM55,224

Drinking Water

– 458.36 MCM

74th 13,665

Orissa 52.96 (28.96

for irrigation)

Medium

Rajastha

n

Major 49.38 (91.75

share cost of

Punjab&

Haryana)

20.09.2000

11.09.200320.09.2000 Chheligada Dam Project

Nohar Irrigation Project (Revised)

Rajastha

n

657.91

(385.60 for

Irrigation)

Major20.09.2000 Bisalpur Drinking Water-cum-Irrigation

Project (Revised)

948

74th

74th

946

947

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

nDrinking Water

Provision – 3

MCM

949 75th 18.12.2000 Bhupathipalem Reservoir Scheme Andhra

Pradesh

Medium 47.23 6516 23.03.2007

950 75th 18.12.2000 Surampalem Reservoir Scheme Phase-II Andhra

Pradesh

Medium 49.5 5520

951 75th 18.12.2000 Konar Bihar Major 336.69 64,738

952 75th 18.12.2000 Balh Valley (Lift Bank) Irrigation Project Himacha

l

Pradesh

Medium 41.64 4354 10.06.2005

953 75th 18.12.2000 Mod. of Kathua Canal Jammu

&

Medium 15.68 3304

954 75th 18.12.2000 Mod. of Zaingir Canal Jammu

&

Medium 13.66 2140 08.06.2001

1,42,083-UP

1,21,450-MP

956 75th 18.12.2000 Brutang Irrigation Project Orissa Major 227.25 30,290

957 75th 18.12.2000 Raising Lining of Bhakra Main Line Punjab Major 20.46 N.A.

958 75th 18.12.2000 Mod. of Agra Canal Uttar

Pradesh

Major 74.16 50,000 11.02.2003

959 76th 29.03.2001 Tri Muhani Kursela Embankment

Scheme (Flood Protection)

Bihar Major 19.74 6,636

960 76th 29.03.2001 Rafiabad High Lift Irrigation Scheme Jammu

&

Medium 35.6 2,932 27.09.2001

961 76th 29.03.2001 Anandpur Barrage Project Across River

Baitarani

Orissa Major 482.26 56,720 30.12.2004

962 76th 29.03.2001 Hadua Irrigation Project Orissa Medium 61.48 5,728

963 76th 29.03.2001 Rajasthan Water sector Restructuring

Project

Rajastha

n

Major 745.59 -

964 76th 29.03.2001 Jewar – Tappal Embankment Scheme

(Flood Protection)

Uttar

Pradesh

Major 27.15 7,619.65

965 76th 29.03.2001 Providing Kharif Channel in Hindon

Krishni Doab (Revised)

Uttar

Pradesh

Major 66.34 11,600

966 77th 03.08.2001 Pun-Pun Barrage Scheme Bihar Major 102.26 13,898 13.01.2006

967 77th 03.08.2001 Mod. of New Pratap Canal Jammu

&

Medium 21.68 12042

968 77th 03.08.2001 Ravi Project Unit-I (Ranjit Sagar {Thein}

Dam with Shahpurkandi Dam Project –

Upper Bari Doab Canal Hydel Project

Stage-III) [Revised Estimate] –

Multipurpose

Punjab Major 5,065.48 3,48,173/645

MW & 168 MW

05.11.2001

969 77th 03.08.2001 Lining of Channel - ERM Punjab Medium 49.02 8,330

970 77th 03.08.2001 Sidhmukh Irrigation Project (Revised) Rajastha

n

Major 220.86 43,214

Rajastha

n

Major 49.38 (91.75

share cost of

Punjab&

Haryana)

20.09.2000 Nohar Irrigation Project (Revised)

Madhya

Pradesh

Major 300.675th 18.12.2000 Rajghat Dam Project

948

955

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n971 77

th 03.08.2001 Extn. of Gomtinagar Protection Bundha

upto 4.8 km. downstream of Northern

Railway Line (Flood Protection)

Uttar

Pradesh

Flood

Control

9.96 -

972 77th 03.08.2001 Protection to the Right Bank of River

Ganga/Padma from downstream of

Farakka Barrage to Jalangi, District

Murshidabad – Flood Protection

West

Bengal

Flood

Control

29.4072 -

973 78th 24.09.2001 Uttar Pradesh Water Sector

Restructuring Project – Phase-I-ERM

Uttar

Pradesh

Major 663.41

(Provisional)

3,00,000

974 79th 24.05.2002 Avulsion of Brahmaputra at Dholla

Hatighuli

Assam Flood

Control

13.71 -

975 79th 24.05.2002 Harang Sub-Basin Drainage

Development Scheme (Revised)

Assam Flood

Control

30.49 -

976 79th 24.05.2002 Markandeya Reservoir Project Karnatak

a

Major 209.85 19105

977 79th 24.05.2002 Lal Nalla Irrigation Project Maharas

htra

Medium 43.61 7020

978 79th 24.05.2002 Purna River Project Maharas

htra

Medium 123.79 7530 23.05.2003

979 79th 24.05.2002 Tajnapur Lift Irrigation Project Phase-I Maharas

htra

Medium 23.46 3622 29.07.2002

980 79th 24.05.2002 Mahendratanaya Irrigation Project Orissa Medium 100.98 9504

981 79th 24.05.2002 Salandi Sanskar Project Orissa Medium 99.14 7111 08.10.2003

982 79th 24.05.2002 Mahi Bajaj Sagar Project, Unit-II: Canal

(Revised)

Rajastha

n

Major 538.58 71,200

983 79th 24.05.2002 Bhupali Pump Canal Uttar

Pradesh

Major 60.53 34,605

984 79th 24.05.2002 Providing Link Channel for Eastern

Yamuna Canal, i.e. Hathnikund Link

Channel (Revised)

Uttar

Pradesh

Major 36.43 -

985 79th 24.05.2002 Pathrai Dam Project (Revised) Uttar

Pradesh

Medium 44.22 2998

986 80th 07.02.2003 Sone Modernization Scheme (Revised) Bihar Major 493.17 900000

987 80th 07.02.2003 Mahanadi Reservoir Project Chattisg

arh

Major 566.88 264000 01.07.2003

988 80th 07.02.2003 Sutiapat Irrigation Project Chattisg

arh

Medium 46.9474 6,960 09.04.2007

989 80th 07.02.2003 Modernization of Dadi Canal Jammu

&

Medium 11.1 4,526 14.09.2004

990 80th 07.02.2003 Upper Tunga Project Karnatak

a

Major 1052.33 80,494

991 80th 07.02.2003 Mahan Irrigation Project (Gulab Sagar

Project)

Madhya

Pradesh

Major 140.51 19,740 24.09.2003

992 80th 07.02.2003 Wakod Irrigation Project Maharas

htra

Medium 34.36 2,217

993 80th 07.02.2003 Ib Irrigation Project Orissa Major 1140 1,06,279

994 80th 07.02.2003 Utilisation of Yamuna Water in

Bharatpur District of Rajasthan

Rajastha

n

Major 175.44 76,681

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n995 80

th 07.02.2003 Utilization of Yamuna Water in

Jhunjhunu & Churu District

Rajastha

n

Major 934.7 1,76,274

996 80th 07.02.2003 Irrukkangudi Reservoir Tamil

Nadu

Major 72 4,229

997 80th 07.02.2003 Bansagar Canal Project Uttar

Pradesh

Major 620.82 1,50,132 29.07.2004

998 80th 07.02.2003 Construction of Marginal Embankment

on Right Bank of River Ghaghra and

Left Bank of River Sarda

Uttar

Pradesh

Major 18.82 -

999 80th 07.02.2003 Improving Water Management on

Existing Sarda Canal System

Uttar

Pradesh

Major 102.41 8,06,300

1001 81st 04.08.2003 Thotapalli Barrage Scheme Andhra

Pradesh

Major 415.87 78443 20.03.2006

1002 81st 04.08.2003 Peddagedda Reservoir Project Andhra

Pradesh

Medium 32.117 4,858

1003 81st 04.08.2003 Mongra Irrigation Project Chattisg

arh

Medium 83.64 9,431 07.01.2005

1004 81st 04.08.2003 Tarali Irrigation Project Maharas

htra

Major 504.96 19,498 23.03.2007

1005 81st 04.08.2003 Kirmiri Darur Lift Irrigation Scheme Maharas

htra

Medium 27.89 2,443 13.10.2003

1006 81st 04.08.2003 Sonapur Tomta Lift Irrigation Scheme Maharas

htra

Medium 32.18 2,441 13.10.2003

1007 81st 04.08.2003 Chilhewadi Irrigation Project Maharas

htra

Medium 146.24 7,138

1008 81st 04.08.2003 Project Estimate for Construction of

Amwa Khas Retire Ring Bund from Km.

0.10 to 1.10

Uttar

Pradesh

Flood

Control

10.368 -

1009 82nd 19.02.2004 Pathrai Dam Project (Revised) Uttar

Pradesh

Medium 53.53 2,998

1010 82nd 19.02.2004 Providing Kharif Channels in Hindon-

Krishni Doab (Revised)

Uttar

Pradesh

Major 92.52 11,600

1011 82nd 19.02.2004 Minimata (Hasdeo) Bango Multipurpose

Project (Revised)

Chattisg

arh

Major 1312.32 4,33,500/120 20.05.2005

1012 82nd 19.02.2004 Mokama Tal Drainage, Raising and

Strengathening of Jamindari Bandh (74

Nos.)

Bihar Flood

Control

28.1668 -

1013 82nd 19.02.2004 Restoration Works of Eastern Gandak

Canal (ERM)

Bihar Major 294 6,62,000 31.03.2004

1014 82nd 19.02.2004 Pothra Nalla Medium Irrigation Project Maharas

htra

Medium 63.08 9,380 02.12.2004

1015 82nd 19.02.2004 Dhom Balakwadi Tunnel Irrigation

Project

Maharas

htra

Major 475.29 12,670 23.03.2007

1016 83rd 18.06.2004 Protection work on the Left Bank of

river Ganga u/s of Farakka Barrage

from Spur No-17 in Village

Panchanandpur , P.S. Kaliachak, district

Malda of West Bengal

West

Bengal

Flood

Control

24.05 -

02.05.2005Uttar

Pradesh

Major 88.3 46,485Modernisation of Lahchura Dam

(Revised)80

th 07.02.20031000

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1017 84

th 12.05.2005 Swan River Flood Management &

Integrated Land Development Project

Phase-II (

Himacha

l

Pradesh

New-

Flood

Control

235.52 -

1018 84th 12.05.2005 Punasa Lift Irrigation Madhya

Pradesh

Major 185.03 36758.4 04.02.2008

1019 84th 12.05.2005 Punad Irrigation Project Maharas

htra

Major 157.78 10846 05.12.2005

1020 84th 12.05.2005 Gul River Maharas

htra

Medium 65.73 3025 09.11.2005

1021 84th 12.05.2005 Haranghat Lift Irrigation Scheme Maharas

htra

Medium 49.2 4819 16.03.2006

1022 85th 22.02.2006 Modernization of Mav Khul Canal Jammu

&

Medium 12.8241 9352 .06.07.2006

1023 85th 22.02.2006 Modernization of Nandi Canal Jammu

&

Medium 6.4615 3060 06.07.2006

1024 85th 22.02.2006 Modernization of Martand i Canal Jammu

&

Medium 27.71 6498 06.07.2006

1025 85th 22.02.2006 Sri Ram Sagar Project Stage-II Andhra

Pradesh

Major 1043.14 193871 20.03.2006

1026 85th 22.02.2006 Pench Diversion Project Madhya

Pradesh

Major 583.4 96519 10.04.2006

1027 85th 22.02.2006 Dhansiri (Revised) Assam Major 401.24 83366 08.08.2007

1028 85th 22.02.2006 Champawati(Revised) Assam Major 147.24 24994 08.08.2007

1029 85th 22.02.2006 Canalizing of Sakki-Kiran Nallah Punjab Flood

Control

118.05 - 28.05.2008

1030 86th 02.06.2006 Moderniation of Babu Canal Jammu

&

Medium 12.3362 3077 06.07.2006

1031 86th 02.06.2006 Master Plan of Chenab River Jammu

&

Kashmir

Flood

Protection

25.45 -

1032 86th 02.06.2006 Master Plan of Tawi River Jammu

&

Kashmir

Flood

Protection

22.82 -- 15.02.2008

1033 86th 02.06.2006 Construction of Jewar-Tappal Marginal

bund

Uttar

Pradesh

Flood

Protection

71.3711 -

1034 86th 02.06.2006 Takli Irrigation Cum Drinking Water

Project

Rajastha

n

Medium 51.81 4791

1035 86th 02.06.2006 Narmada Canal Project Rajastha

n

Major 1541.357 151072 08.08.2007

1036 86th 02.06.2006 Pedavagu diversion scheme Andhra

Pradesh

Medium 124.64 6000 27.06.2006

1037 86th 02.06.2006 Rallivagu Reservoir Project Andhra

Pradesh

Medium 33.3 2430 27.06.2006

1038 86th 02.06.2006 Mathadivagu Reservoir Project Andhra

Pradesh

Medium 50.4 3440 27.06.2006

1039 86th 02.06.2006 Gagrin Irrigation Project Rajastha

n

Medium 80.12 9675

1040 86th 02.06.2006 Modernization of Ahji Canal Jammu

&

Medium 20.5149 8315.9 19-02-2008

1041 86th 02.06.2006 Golavagu Reservoir Project Andhra

Pradesh

Medium 84.08 3845 27.06.2006

1042 86th 02.06.2006 Manjore Irrigation Project Orissa Medium 99.53 10433 01.12.2007

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1043 86

th 02.06.2006 Piplad Irrigation Project Rajastha

n

Medium 33.64 3549

1044 86th 02.06.2006 Modernization of Dadi Canal Jammu

&

Medium 49.95 4650.13 06.07.2006

1045 86th 02.06.2006 Rafiabad high Lift Irrigation Scheme Jammu

&

Medium 63.62 2932 28.02.2008

1046 86th 02.06.2006 Pushkara Lift Irrigation Scheme Andhra

Pradesh

Major 379.503 75235 27.06.2006

1047 86th 02.06.2006 Tadipudi Lift Irrigation Scheme Andhra

Pradesh

Major 376.96 83599 27.06.2006

1048 87th 17.11.2006 Kachnoda Dam Project Uttar

Pradesh

Major 88.79 10850 03.01.2007

1049 87th 17.11.2006 1

st Patiala Feeder & Kotla Branch Punjab Major 123.3 68624 30.03.2007

1050 87th 17.11.2006 Nilwai Reservoir Project Andhra

Pradesh

Medium 90.5 5260 12.02.2007

1051 87th 17.11.2006 Kandi Canal Project Jammu

&

Medium 53.7 3229 30.03.2007

1052 87th 17.11.2006 Balh Valliey (Left Bank) Himacha

l

Medium 62.25 4354

1053 87th 17.11.2006 Widening, strengthing and providing

10m wide road way on Alipur Bund on

left Bank of river Yamuna

Uttar

Pradesh

Flood

Protection

42.2 - 22.12.2006

1054 87th 17.11.2006 Improving Irrigation intensity of Hardoi

Branch system

Uttar

Pradesh

Major 105.2997 306055 08.12.2006

1055 88th 02.03.2007 Alisagar Lift Irrigation Scheme. Andhra

Pradesh

Major 227.9 21770 23.03.2007

1056 88th 02.03.2007 Gutpha Lift Irrigation Scheme Andhra

Pradesh

Major 171.91 15699 23.03.2007

1057 88th 02.03.2007 Godavari Lift Irrigation Andhra

Pradesh

Major 6016 286000 23.03.2007

1058 88th 02.03.2007 Bembla River Project Maharas

htra

Major 1276.87 70756 -

1059 88th 02.03.2007 Khadakpurna River Project Maharas

htra

Major 578.56 24864 23.03.2007

1060 88th 02.03.2007 Arunavati River Project Maharas

htra

Major 224.16 25155 23.03.2007

1061 88th 02.03.2007 Lal Nalla Irrigation Project Maharas

htra

Medium 103.49 7320 23.03.2007

1062 88th 02.03.2007 Kar Irrigation Project Maharas

htra

Medium 170.04 6744 23.03.2007

1063 88th 02.03.2007 Lower Wardha Irrigation Scheme Maharas

htra

Major 857.7 51655 23.03.2007

1064 88th 02.03.2007 Musurumilli Reservoir Project Andhra

Pradesh

Medium 207 15676 23.03.2007

1065 88th 02.03.2007 Lhasi Irrigation Project Rajastha

n

Medium 44.73 6008 26.12.2007

1066 88th 02.03.2007 Construction of Marginal

Embankment on Right Bank of

River Ghaghra & Left Bank of River

Sarda

Uttar

Pradesh

Flood

Protection

46.52

1067 88th 02.03.2007 Dolaithabi Barrage Project Manipur Medium 98.37 7545 10.05.2007

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1068 89

th 27.06.2007 D’zuza Irrigation Scheme Nagala

nd

Medium 75.2 10146

1069 89th 27.06.2007 Punpun Barrage project (Revised) Bihar Major 199.41 13680 05.10.2007

1070 89th 27.06.2007 Madhya Ganga Canal pariyojana

Stage-II,

Uttar

Prades

h

Major 1060.76 225430 12.12.2008

1071 89th 27.06.2007 Lower Indira Irrigation

Project(Reviseid),

Orissa Major 521.13 38870

1072 89th 27.06.2007 Thoubal Multipurpose Project

(Revised)

Manipu

r

Major 715.81 33449

1073 89th 27.06.2007 Chandrabhaga(Barrage) Irrigation

Project

Mahara

shtra

Medium 188.925 8135 05.10.2007

1074 89th 27.06.2007 Sapan (Barrage) Irrigation Project Mahara

shtra

Medium 200.7 7195 05.10.2007

1075 89th 27.06.2007 Uttarman Irrigation Project Mahara

shtra

Medium 123.169 5280/0.5MW 20.09.2007

1076 89th 27.06.2007 Wang Irrigation Project Mahara

shtra

Medium 162.782 7068/3.00MW 20.09.2007

1077 89th 27.06.2007 Morna (Gureghar) Irrigation

Project

Mahara

shtra

Medium 129.641 3075/0.80MW 20.09.2007

1078 89th 27.06.2007 Pentakli Irrigation Project Mahara

shtra

Major 169.67 14332 24.09.2007

1079 89th 27.06.2007 Sidhatha Irrigation Project Himach

al

Medium 66.35 5348 08.11.2007

1080 90th 26.09.2007 Shah Nahar Irrigation Project

(Revised)

Himach

al

Prades

Major 310.89 24772 17.01.2008

1081 90th 26.09.2007 Changer Area LIS (Revised) Himach

al

Prades

Medium 88.09 3.041

1082 90th 26.09.2007 Bateshwar Sthan Ganga Pump Canal,

Phase-I(Revised)

Bihar Major 389.31 27603 10.3.2010

347000

(197000Additio

nal)1084 90th 26.09.2007 Parkachik Khawas Irrigation Canal Jammu

&

Medium 35.44 2262

1085 90th 26.09.2007 Improvement of South Saraswati

River

West

Bengal

Flood

Protection

32.1

1086 90th 26.09.2007 Mahanadi Reservoir Project

(Revised)

Chattisg

arh

Major 845 264000 11.12.2007

1087 90th 26.09.2007 Sangola Branch Canal Project Mahara

shtra

Major 287.77 11288 17.12.2007

1088 90th 26.09.2007 Sulwade Barrage Mahara

shtra

Medium 290.88 8533 10.12.2007

1089 90th 26.09.2007 Sarakhade Barrage Mahara

shtra

Medium 202.48 11320 10.12.2007

1090 90th 26.09.2007 Praksha Barrage Mahara

shtra

Medium 178.91 10180 10.12.2007

1091 91st 07.11.2007 Component of Bagmathi Multi- Purpose

Project

Bihar Flood

Control

135.16 ---- 15.02.2008

1092 91st 07.11.2007 Raising & strengthening of existing

embankment along Kmla River

Bihar Flood

Control

52.0926 --- 15.02.2008

1093 91st 07.11.2007 Flood control Embankments in

Mahananda Basin/Sub-Basin

Bihar Flood

Control

603.88 ---

Bansagar Canal Project (Revised) Major 1674.11 25.04.2008Uttar

Prades

h

1083 90th 26.09.2007

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1094 91st 07.11.2007 Raising & strenthning and Extension of

existing left&R/B in Chandan River

system

Bihar Flood

Control

147.6868 ---

1095 91st 07.11.2007 Raising & strenthning and

Extension of existing Right

Embankment along Gerua River

Jharkha

nd

Flood

Control

20.123 --- 11.07.2008

1096 91st 07.11.2007 Purna Irrigation Project Mahara

shtra

Medium 213.1 7530 25.04.2008

1097 92nd 27.02.2008 Gosikhurd Irri. Project, Revised Mahara

shtra

Major 7777.85 250800 14.05.2008

1098 92nd 27.02.2008 Dudhganga Irr. Project Mahara

shtra

Major 1460.57 81975 02.04.2008

1099 92nd 27.02.2008 Kanhirapuzha Irri. Project (ERM) Kerala Medium 30 2806 01.08.2008

1100 92nd 27.02.2008 Modernization of Canal System of

Bhadra Reservoir Project (ERM)

Karnat

aka

7 951 177337 31.03.2008

1101 92nd 27.02.2008 Hippargi Irrigation Project Karnat

aka

Major 1521.78 74742 04.04.2008

1102 92nd 27.02.2008 Rengali Sub-Project–RBC

(Revised)

Orissa Major 1290.93 143490

1103 92nd 27.02.2008 Chhelligada Dam Project (Revised) Orissa Medium 201.01 3876

1104 92nd 27.02.2008 Khuga Multipurpose Project

(Revised)

Manipu

r

Medium 335.15 14775/1.5 MW 16.10.2008

Orissa Integrated & Water

Management Investment

Programme (OIIAWMIP)-

Tranch-1.a)   Mahanadi Chitropola Irrigation

Project (Revised)

Orissa Major 395.45 25160

b)   Improvement of Taladanda

Main Canal Project (ERM)

Orissa Major 101.32 53602

c)    Improvement of Gohira

Irrigation Project (ERM)

Orissa Medium 23.1 12456

d)   Improvement of Remal

Irrigation Project (ERM)

Orissa Medium 12.57 5607

e)   Improvement in Sunei

Irrigation Project (ERM)

Orissa Medium 25.93 14159

1106 93rd 22.05.2008 Kudali Irrigation Project Mahara

shtra

Medium-

Revised

271.79 8480 04.02.2009

1107 93rd 22.05.2008 Modernization of New Pratap Canal Jammu

&

Medium 47.6 13309 01.09.2008

1108 93rd 22.05.2008 Anti Erosion Scheme for Protection of

Khaipur, Raghopur, Akidatpur villages

from river Ganga.

Bihar Flood

Control

23.5581 --- 04.08.2008

1109 93rd 22.05.2008 Raising & Strengthening of Tirhut

Embankment from 29.61 km to 83.40

km on the Left Bank of river Gandak.

Bihar Flood

Control

26.2765 ---

1110 94th 09.07.2008 Lower Goi Irrigation Project Madhya

Prades

Major 360.37 15686 12.08.2008

1111 94th 09.07.2008 Lower Pedhi Project Mahara

shtra

Major-

Revised

283.1 17023 14.08.2008

08.08.0893rd 22.05.20081105

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1112 94th 09.07.2008 Upper Kundlika Project Mahara

shtra

Medium-

New

72.7 2800 09.09.2008

1113 95th 20.01.2009 Protection of Sialmari Area from the

erosion of River Brahmaputra

(Construction of Land Spurs and Tie

Bund)

Assam Flood

Control

25.73 --

1114 95th 20.01.2009 Protection of Bhojaikhati, Doloigaon

and Ulubari Area from The erosion of

River Brahmaputra (Construction of

Land Spurs and Tie Bund)

Assam Flood

Control

27.92 --

1115 95th 20.01.2009 Raising & Strengthening to

Brahmaputra Dyke From Sissikalghar to

Tekeliphuta including closing of breach

by retirement and anti Erosion

Measures

Assam Flood

Control

142.42 --

1116 95th 20.01.2009 Raising, strengthening and construction

of Bituminous road over Eastern and

Western Kosi Embankments

Bihar Flood

Control

339.39 -- 18.03.2009

1117 95th 20.01.2009 Raising, strengthening and extension of

existing embankments along Bhutahi

Balan river

Bihar Flood

Control

37.14 -- 18.03.2009

1118 95th 20.01.2009 Breach Closure of Eastern Afflux Bund

in Nepal

Bihar Flood

Control

143.42 -- 22.05.2009

1119 95th 20.01.2009 Proposal for Kosi Barrage Restoration

Work

Bihar New-

Major

86.65 16.03.2009

1120 95th 20.01.2009 Kelo Irrigation Project Chattisg

arh

New-

Major

606.91 22810 20.02.2009

1121 95th 20.01.2009 Channelisation of Bata River from

RD10230 to 19700 Mtr.

Himacha

l

Pradesh

Flood

Control

34.67 1537.81

1122 95th 20.01.2009 Revised Project Estimate for widening,

strengthening and providing 10 m wide

road way on Alipur bund on left bank of

river Yamuna.

Uttar

Pradesh

Flood

Control

46.17 --

1123 95th 20.01.2009 Indira Sagar( Polavaram) Project- Andhra

Pradesh

Revised-

Major

10151.04 436000

1124 95th 20.01.2009 Utawali Medium Irrigation Project,

(Revised Estimate)

Maharas

htra

Medium 109.64 5394 21.07.2009

1125 95th 20.01.2009 Lower Panzara Irrigation project Maharas

htra

New-

Medium

34.73 7585 01.04.2009

1126 95th 20.01.2009 Nandur Madhameshwar Irrigation

Project (Revised Estimate)

Maharas

htra

Major 941.33 45124 17.04.2009

1127 95th 20.01.2009 Kamani Tanda Medium Irrigation

Project

Maharas

htra

New-

Medium

78.49 4750 01.04.2009

1128 95th 20.01.2009 Kandi Canal Extension from

Hoshiarpur to Bachaur (RD 59.50 to

130.00 km) Stage-II (Revised

Estimate)

Punjab Major 346.62 23326 12.04.2010

1129 95th 20.01.2009 Teesta Barrage project 1

stsub stage of

Stage-I of phase-I (Revised)

West

Bengal

Major 2988.61 527000

1130 96th 16.02.2009 Protection of Majuli Island from Flood

and Erosion Phase-II & III,

Assam Flood

Control

115.03 --

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1131 96th 16.02.2009 Restoration of Dibang and Lohit rivers

to their original course at Dholla

Hatighuli (old name: Avulsion of

Brahmputra at Dholla Hatighuli).

Assam Flood

Control

53.11 --

1132 97th 27.03.2009 Raising and strengthening of river

Yamuna in the state of Haryana

Haryana Flood

Control

173.75 -- 11.08.2009

1133 97th 27.03.2009 Punand Irrigation Project (Revised

Estimate)

Maharas

htra

Major 157.78 10,846 22.05.2009

1134 97th 27.03.2009 Rajiv Bhima Lift irrigation Scheme

(Revised Estimate)

Andhra

Pradesh

Major 1969 82151

1135 97th 27.03.2009 Malampuzha Irriagtion project-ERM Kerala Major 11.08 45108/

Stabilization-

1926

05.01.2010

1136 97th 27.03.2009 Chitturpuzha Irrigation Project (ERM) Kerala Major 34.57 33880

stabilization-

4,964

10.03.2010

1137 97th 27.03.2009 Restoring capacity of Sharda Sahayak

system (ERM)

Uttar

Pradesh

Major 319.23 1750000

stabilization-

7,90,000

20.08.2009

1138 97th 27.03.2009 Western Kosi Canal Project (India

Portion)- Revised

Bihar Major 1307.21 234800

1139 98th 09.07.2009 Flood protection works along the Right

bank of river Gandak

Uttar

Pradesh

Flood

Control

63.7022 145364

1140 98th 09.07.2009 Flood protection works along the Left &

Right bank of river Ghaghra

Uttar

Pradesh

Flood

Control

110 48612

1141 98th 09.07.2009 Minimata (Hasdeo) Bango Multipurpose

Scheme (Revised)

Chattisg

arh

Major 1660.88 433000 07.12.2010

Completed

in XI Plan

1142 98th 09.07.2009 Renovation and Restoration of Bheema

Samudra Tank (New)

Karnata

ka

Medium 9.375 2530

1143 98th 09.07.2009 Punasa Lift irrigation Scheme (Revised) Madhya

Pradesh

Major 488.08 36758 18.09.2009

1144 98th 09.07.2009 Dongargaon Tank Project (Revised) Maharas

htra

Medium 67.039 3942 16.09.2009

completed in

XI Plan

1145 98th 09.07.2009 Krishna-Koyna Lift Irrigation Scheme

(new)

Maharas

htra

Major-

Revised

2224.76 121256 13.10.2009

1146 98th 09.07.2009 Kanupur Multipupose Project (Revised) Orissa Major 1067.51 47709 2.12.2009

1147 98th 09.07.2009 Upper Indravati Irrigation Project

(Revised)

Orissa Major 564.77 41794 24.02.2010

1148 98th 09.07.2009 Lower Indra Irrigation Project (Revised) Orissa Major 1182.23 38870 02.12.2009

1149 98th 09.07.2009 Subarnarekha Irrigation Project

(Revised)

Orissa Major 4049.93 187462 05.02.2010

1150 98th 09.07.2009 Relining of Rajasthan feeder from RD

179000 to 496000-ERM

Punjab Major 952.1 93117 23.11.2009

1151 98th 09.07.2009 Relining of Sirhind feeder from RD

119700 to 447927-ERM

Punjab Major 489.165 34548 23.11.2009

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1152 98th 09.07.2009 Eastern Ganga Canal Project(Revised) Uttar

Pradesh

Major 892.44 105000 22.01.2010

completed in

XI Plan

1153 99th 24.08.2009 Restoration of Eastern Kosi Canal

System

Bihar Major 750.75

(2008)

735500

1154 99th 24.08.2009 Krishna Delta Modernization Scheme

including Pulichintala Dam Project

(New)

Andhra

Pradesh

Major 3684.5(2411.

25+1273.25)

575000 25.02.2010

1155 99th 24.08.2009 Koserteda Irrigation Project (Revised) Chattisg

arh

Medium 154.65 11120 10.05.2010

Completed

in XI Plan

1156 99th 24.08.2009 Gandorinala Irrigation Project (Revised) Karnata

ka

Medium 240 11655 26.11.2009

completed in

XI Plan

1157 99th 24.08.2009 Indira Sagar Multipurpose Project

(Revised)

Madhya

Pradesh

Major 3182.77 16900/1000

MW

14.06.2010

1158 99th 24.08.2009 Omkareshwar Multipurpose project

(Revised)

Madhya

Pradesh

Major 2504.8 283324

1159 99th 24.08.2009 Mahi Irrigation Project (Revised) Madhya

Pradesh

Major 490.39 26429 20.09.2011

completed in

XI Plan1160 99th 24.08.2009 Upper Beda Irrigation Project (Revised) Madhya

Pradesh

Medium 224.41 13400

1161 99th 24.08.2009 Gul River Project (Revised) Maharas

htra

Medium 96.62 3025 29.01.2010

1162 99th 24.08.2009 Shahpurkandi Dam Project (Revised) Punjab Major 2285.81(Irr.6

53.97

37173/168MW 08.02.2010

1163 99th 24.08.2009 Modernization of Lahchura dam

(Revised)

Uttar

Pradesh

Major 299.36 46485 23.11.2009

1164 100th 09.10.2009 Upper Sankh Reservoir Scheme

(Revised)

Jharkha

nd

Medium 141.19 7,069 11.06.2010

completed in

XI Plan

1165 100th 09.10.2009 Panchkhero Reservoir Scheme

(Revised)

Jharkha

nd

Medium 75.69 2,601 06.07.2010

completed in

XII Plan

1166 100th 09.10.2009 Surangi Reservoir Scheme (Revised) Jharkha

nd

Medium 41.17 2,601 originally

approved on

01.03.1982,

Completed

in XI Plan

1167 100th 09.10.2009 Ghataprabha Stage-III Project

(Revised)

Karnata

ka

Major 1210.51 1,77,822 15.12.2009

completed in

XI Plan

1168 100th 09.10.2009 Malaprabha Project (Revised) Karnata

ka

Major 1383.48 1,96,132 completed in

XI Plan

1169 100th 09.10.2009 Bhima Lift Irrigation project (New) Karnata

ka

Major 551.93 (PL-

2008-09)

24,292 15.12.2009

1170 100th 09.10.2009 Karanja Irrigation Project (Revised) Karnata

ka

Major 532 44,574 15.12.2009

1171 100th 09.10.2009 Upper Krishna Project Stage-I

(Revised)

Karnata

ka

Major 6891.59 4,59,000 22.01.2010

1172 100th 09.10.2009 Upper Krishna Project Stage-II

(Revised)

Karnata

ka

Major 3959.8 2,27,000 22.01.2010

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1173 100th 09.10.2009 Guddada Mallapua Lift Irrigation

scheme (New)

Karnata

ka

Medium 115.4 5,261 15.12.2009

1174 100th 09.10.2009 Bargi Diversion project (Revised) Madhya

Pradesh

Major 5127.22 3,77,000 17.12.2009

1175 100th 09.10.2009 Sagar Medium Irrigation Project (New) Madhya

Pradesh

Medium 239.99 17,061 12.04.2010

1176 100th 09.10.2009 Dolaithabi Barrage project (Revised) Manipur Medium 215.52 7,545 01.01.2010

completed in

XI Plan

1177 100th 09.10.2009 Khuga Irrigation Project (Revised) Manipur Medium 381.28 14,755 12.04.2010

1178 100th 09.10.2009 Gumti Irrigation Project (Revised) Tripura Medium 83.01 9,800 25.03.2010

1179 100th 09.10.2009 Manu Irrigation Project (Revised) Tripura Medium 98.71 7,600 25.03.2010

1180 100th 09.10.2009 Khowai Irrigation Project (Revised) Tripura Medium 91.64 9,320 25.03.2010

1181 100th 09.10.2009 Arjun Sahayak Pariyojna (New) Uttar

Pradesh

Major 806.5 1,49,764 23.11.2009

1182 100th 09.10.2009 Bank Protection works along both

banks of river Bhagirathi at Sundarpur

& Basantpur, Kazipara to Nabagram &

Saharbati to Uttarasan

West

Bengal

Flood

Control

23.67 529 21.12.2009

1183 100th 09.10.2009 Bank Protection works along right bank

of river Ganga-Padma at Ichalipara,

Moya, Galadarya, Paschim Beechpara

West

Bengal

Flood

Control

28.14 300 21.12.2009

1184 101st 30.11.2009 Raising and strengthening to Puthimari

embakment on both banks from RG

Railway line to RA Pailway line( from ch

21st km to Ch 36th km on right bank

and from chainage 18th km to 35th km

on Left bank)

Assam Flood

Control

30.23 A.P-15,000

1185 101st 30.11.2009 Anti erosion measures to protect

Bramhputra Dyke on left Bank from

Gumi to Kalatoli at Goroimari- Major top

area in between ch 27.8 km to ch 31.9

km.

Assam Flood

Control

27.97 A.P-5,000

1186 101st 30.11.2009 Protection of Gakhirakhaitee and its

adjoining area from the erosion of river

Brahmaputra

Assam Flood

Control

19.06 A.P-20,000

1187 101st 30.11.2009 Flood protection works in Kolli Dam

(Coleroon)

Tamil

Nadu

Flood

Control

375.9 A.P-2,53,091 15.01.2010

1188 101st 30.11.2009 Flood protection works in Yanam. Puduche

rry

Flood

Control

139.67 A.P-81 22.01.2010

1189 101st 30.11.2009 Nepal Benefit Scheme-2009 Gandak

Project (New)

Bihar Major 171.84 69,600 21.06.2010

1190 101st 30.11.2009 Batane Reservoir Project (Revised) Bihar Major 113.81 12,126 12.05.2010

1191 101st 30.11.2009 Punpun Barrage project (Revised) Bihar Major 658.12 13,680 10.03.2010

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1192 101st 30.11.2009 Modernisation of Ranbir Canal Project

(Revised)

Jammu

&

Kashmir

Major 176.89 55,418 06.05.2010

1193 101st 30.11.2009 Bariyarpur Left bank canal Project

(Revised)

Madhya

Pradesh

Major 477.26 43,850 11.03.2010

completed in

XI Plan

1194 101st 30.11.2009 Bansagar Canal Project - Unit- II

(Revised)

Madhya

Pradesh

Major 2143.65 2,49,359 25.02.2010

1195 101st 30.11.2009 Sindh Piver Project Phase - II (Revised) Madhya

Pradesh

Major 2045.74 1,62,100 25.03.2010

1196 101st 30.11.2009 Singhpur Irrigation Project (New) Madhya

Pradesh

Medium 200.52 6,000 25.03.2010

1197 101st 30.11.2009 Bah Irrigation Project (Revised) Madhya

Pradesh

Medium 250.33 17,807 25.03.2010

1198 101st 30.11.2009 Dhom Balkawadi Tunnel Irrigation

Project (Revised)

Maharas

thra

Major 848.89 12,670 09.02.2010

1199 101st 30.11.2009 Tillari Irrigation Project (Revised) Maharas

thra &

Goa,

joint

Major 1612.15 30,733 23.02.2010

1200 101st 30.11.2009 Thoubal Multipupose Project (Revised) Manipur Major 982 33,449 13.04.2010

1201 101st 30.11.2009 Lower Suktel Irrigation Project

(Revised)

Orissa Major 1041.81 29,845 16.03.2010

1202 101st 30.11.2009 Telengiri Irrigation Project (Revised) Orissa Medium 474.05 13,789 10.03.2010

1203 101st 30.11.2009 Tatko Irrigation Project (Revised) West

Bengal

Medium 19.76 2,494 completed

with liabilities

in XII Plan

1204 101st 30.11.2009 Patloi Irrigation Project (Revised) West

Bengal

Medium 17.28 2,158 15.07.2011

completed in

XI Plan

1205 102nd 28.01.2010 Emergent Measures for Protection of

Rohmoria in Dibrugarh District, Assam.

Assam Flood

Control

59.91 18,000 15.02.2010

1206 102nd 28.01.2010 Raising & Strengthening of

Existing Left & Right Embankments

in Lower Reach of Mahananda

River, Bihar

Bihar Flood

Control

149.69 85.09 17.03.2010

1207 102nd 28.01.2010 Raising, Strengthening of Left

Burhi Gandak Embankment U/s of

Akharaghat Bridge from Minapur to

Vijay Chapra & in D/s from

Akharaghaat Bridge to Samastipur

District Border(0 to 45.5 km),

Bihar

Bihar Flood

Control

22.41 30,000 06.07.2010

1208 102nd 28.01.2010 Anti Erosion Work along the left

bank of river Ganga (1) at Ramdiri-

Sihama Erosion Site near Gupta

Embankment (2) near Gupta

Lakhminia Embankment (3) near

Sanaha Gorgama Embankment &

(4) Raising and strengthening of

Gogari Narayanpur Embankment,

Nayagaon

Bihar Flood

Control

29.33 25,000 06.07.2010

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1209 102

nd 28.01.2010 Construction of Embankment along

river Jhim and Jamura (Adhwara

Group) From Sonbarsa Bajar to

Sonbarsa vllage on Left Bank

(25.71 Km) and Right Bank

(26.06Km), Bihar.

Bihar Flood

Control

64.52 17,400 06.07.2010

1210 102nd 28.01.2010 Extension of Embankment on Left

and Right bank of River Kamala

Balan in lengths of 11.42km and 5

km with Brick soling road on top in

left over reaches and protection

work at two points on extended

portion of right Kamla Balan

embankment, Bihar.

Bihar Flood

Control

56.12 3,16,000 06.07.2013

1211 102nd 28.01.2010 Comprehensive flood management

works to Vellar basin in Cuddalore

and Villupuram districts of Tamil

Nadu.

Tamil

Nadu

Flood

Control

164.32 24,498

1212 102nd 28.01.2010 Comprehensive flood management

works to Panduti and Cuddalore

towns from ivers Pennaiyar,

Gadilam, Uppanar, Paravanar and

south Malattar in Cuddalore district

of Tamil Nadu.

Tamil

Nadu

Flood

Control

68.41 19,347

1213 102nd 28.01.2010 Project for proposed flood

protection works along left and

right bank of river Ganga in

District J.P. Nagar, Shahajahnpur,

Meerut and Bulandshahr, U.P

Uttar

Pradesh

Flood

Control

32.42 14,360

1214 102nd 28.01.2010 Project for reconstruction,

remodeling and improvement of

embankments in Sundarban and

adjoining areas in the districts of

North & south 24 Parganas,

damaged by severe cyclone

“AILA”, West Bengal

West

Bengal

Flood

Control

5032 2,100 Sq.km 12.03.2010

1215 102nd 28.01.2010 Scheme for Kaliaghai-Kapaleswari-

Baghai Drainage Basin, West

Bengal.

West

Bengal

Flood

Control

650.38 621 Sq.km 09.03.2010

1216 102nd 28.01.2010 Mitigation of Flood in Group – I, 14

Padasekharans in Kuttanad of

Kerala

Kerala Flood

Control

24.7 --

1217 102nd 28.01.2010 Bansagar Dam (Unit I) Project, Madhya

Pradesh(Revised)

Madhya

Pradesh

Major 1582.94 4,93,000

1218 102nd 28.01.2010 Khadakpurna River Project,

Maharashtra. (Revised)

Maharas

htra

Major 917.95 24,864 19.01.2012

1219 102nd 28.01.2010 Tarali Irrigation Project,

Maharashtra. (Revised)

Maharas

htra

Major 870.9 19,498 11.03.2010

1220 102nd 28.01.2010 Upper Penganga Project,

Maharashtra (Revised)

Maharas

htra

Major 3038.42 1,16,728 12.04.2010

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1221 102

nd 28.01.2010 Lower Dudhana Irrigation Project,

Maharashtra.(Revised)

Maharas

htra

Major 1349.5 44,482 24.02.2010

1222 102nd 28.01.2010 Umarhut Pump Canal Phase-II (New-

ERM)

Uttar

Pradesh

Major 73.69 49948

(Restoation

19,820)

originally

approved on

17.02.1977

1223 103rd 11.03.2010 Champamati (Barrage) Irrigation project

(Revised)

Assam Major 309.22 24,994 originally

approved on

29.4.1980

1224 103rd 11.03.2010 Sardar Sarovar Narmada project

(Revised)

Gujarat Major 39240.45

( 2008-09

PL)

17,92,000 20.05.2010

1225 103rd 11.03.2010 Rehabilitation, Modernisation of drains

to recharge the Ground water (ERM)

Haryana Major 67.28 159311

(Restoration

28822)

03.06.2011

1226 103rd 11.03.2010 Modernisation of Chadrampalli project

(ERM)

Karnata

ka

Medium 14.93 8446

(Restoation

1935 ha)

1227 103rd 11.03.2010 Modernisation of Hattikuni project

(ERM)

Karnata

ka

Medium 6.75 2145

(Restoration

956 ha)

1228 103rd 11.03.2010 Modernisation of Upper Mullamari

project (ERM)

Karnata

ka

Medium 8.21 3279

(Restoration

1500 ha)

1229 103rd 11.03.2010 Mahan (Gulab Sagar) Irrigation Project

(Revised)

Madhya

Pradesh

Major 486.96 19,740 25.03.2011

completed in

XI I Plan

1230 103rd 11.03.2010 Jobat Medium Irrigation project

(Revised)

Madhya

Pradesh

Medium 230.61 12,507 02.08.2010

1231 103rd 11.03.2010 Ghungshi Barrage Medium Irigation

Project

Maharas

htra

New-

Medium

170.15 6,660

12.04.2010

1232 103rd 11.03.2010 Extensiion, Renovation and

modernisation of Canal being fed from

River Sutlej- ERM

Punjab Major 734.46 6,67,000

(Restoration

198,924 ha )

additional

8144 ha

1233 103rd 11.03.2010 Narmada Canal Project (Revised) Rajastha

n

Major 2481.49 1,51,000 09.07.2010

1234 103rd 11.03.2010 Saryu Nahar Pariyojana (Revised) Uttar

Pradesh

Major 7270.32 1,44,000 16.04.2010

completed

with liabilities

in XII Plan

1235 103rd 11.03.2010 Tral Lift Irrigation scheme (Revised) Jammu

&

Kashmir

Medium 140.76 6,000 Originally

approved on

02.01.1979

1236 103rd 11.03.2010 Rajpora Medium Irrigation scheme

(Revised)

Jammu

&

Kashmir

Medium 70.2 2,429 12.05.2010

1237 104th 12.05.2010 Karra Nalla Irrigation Project Chattisgarh New-

Medium

99.19 4,100

22.06.2010

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1238 104

th 12.05.2010 Ghumariya Nalla Irrigation Project Chattisgarh New-

Medium

47.79 3,200

09.07.2010

1239 104th 12.05.2010 Sutiapat Irrigation Project (Revised) ChattisgarhMedium 98.62 6,960

09.07.2010

1240 104th 12.05.2010 Improving Irrigation Intensity of Hardoi

Branch System (Revised - ERM)

Uttar

Pradesh

Major 135.17 3,06,055

(Restoration

95,961 ha )Ist revised

approved on

08.12.2006

1241 104th 12.05.2010 Rajiv Sagar (Bawanthadi) (Revised) Madhya

Pradesh

&

Maharas

Major 161.57 57,120

1242 104th 12.05.2010 Purna Barrage-II (Ner Dhamana)

medium Irrigation Project

MaharashtraNew-

Medium

179.28 7,302 17.07.2010

1243 104th 12.05.2010 Upper Manar Irrigation Project

(Revised)

MaharashtraMedium 525.4 12,420 16.07.2010

1244 104th 12.05.2010 Modernization of Zaingir Canal Irrigation

Project (ERM)

Jammu & KashmirMedium 73.51 7,100 originally

approved on

8.6.2001

1245 104th 12.05.2010 Modernization of Lar Canal Project

(ERM)

Jammu & KashmirMedium 47.72 2,231 (

Additional

617Ha)

1246 104th 12.05.2010 Modernization of Grimtoo canal (ERM) Jammu & KashmirMedium 99.09 4,734

1247 104th 12.05.2010 Restoration & Modernization of main

Ravi canal and its distribution system

(ERM)

Jammu & KashmirMajor 62.27 50749

(Restoration

15,016)

1248 104th 12.05.2010 Raising and strengthening of Left and

Right Embankment along None River

Bihar Flood

Control

26.71 A.P 2,72,000 02.08.2010

1249 104th 12.05.2010 Flood Threat of River Jhelum Jammu & KashmirFlood

Control

97.46 --

1250 104th 12.05.2010 Regulation of Flood water in Kayal

Area, 4 Padasekhrams and Mitigation

of Floods in Group-9, 5 Padasekharams

in Kuttanad Region of Kerala

Kerala Flood

Control

118.91 3,266

1251 104th 12.05.2010 Flood protection works of river Yamuna,

Saharanpur district

Uttar PradeshFlood

Control

28.113 20villages

1252 104th 12.05.2010 Flood Protection works along Left and

Right Bank of River Rapti

Uttar PradeshFlood

Control

68.82 365.48 sq.km

1253 104th 12.05.2010 Flood protection works along left and

right bank of river Yamuna

Uttar PradeshFlood

Control

43.80 18,633

1254 104th 12.05.2010 Construction of embankment along left

bank of river Ganga in district J P Nagar

and Bijnor

Uttar PradeshFlood

Control

33.23 4,000

1255 104th 12.05.2010 Anti-erosion works to protect sensitive

cluster of villages along right bank of

river Ghaghra in district Lakhimpur

Kheri

Uttar PradeshFlood

Control

30.40 195

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1256 104

th 12.05.2010 Anti-erosion works to protect sensitive

cluster of villages along left and right

bank of river Sarda in district Lakhimpur

Kheri and Sitapur

Uttar PradeshFlood

Control

25.04 140

1257 105th 25.06.2010 Restoration Works of Eastern Gandak

Canal system (Revised)

Bihar Major 684.78 6,62,000

(Restoration

4,36,000 ha.)

Ist Revised

approved on

31.03.2004

& 2nd

revised on

date

04.11.2010

1258 105th 25.06.2010 Khrung Tank Project-ERM Chattisgarh Major 101.04 56,300

(Additnl.Irri.

15,300)

25.08.2010

1259 105th 25.06.2010 Halon Irrigation Project Madhya

Pradesh

New-

Major

414.21 16,782 15.04.2011

1260 105th 25.06.2010 Man Irrigation Project Madhya

Pradesh

Revised-

Major

246.03 17,700 31.12.2010

1261 105th 25.06.2010 Upper Narmada Irrigation Project Madhya

Pradesh

New-

Major

683.93 26,622 05.12.2010

1262 105th 25.06.2010 Shelgaon Barrage project MaharashtraNew-

Medium

446.49 11,318

1263 105th 25.06.2010 Rengali Irrigation Sub-Project–LBC-II

(Revised)

Orissa Major 1958.34 1,77,651 Originally

approved on

17.11.1998

1264 105th 25.06.2010 Kachnoda Dam Project (Revised) Uttar PradeshMajor 423.45 10,850 02.08.2010

1265 105th 25.06.2010 Flood Protection Works to Brahmani-

Kelua-Birupa Doab of Brahmani system

of Orissa State

Orissa Flood

Control

32.32 17,100

1266 105th 25.06.2010 Revised Project Estimate for

constructon of right Marginal bund on

river ganga from Bhogpur to Balawali

Uttarakh

and

Flood

Control

20.69 9,000

1267 105th 25.06.2010 Scheme for Desisting of river Ichamati

along the common border portion for

better drainage and flood management.

West

Bengal

Flood

Control

38.23 225 sq.km

1268 106th 16.09.2010 J. Chokka Rao Godavari Lift Irrigation

Scheme (Revised)

Andhra

Pradesh

Major 9427.73 2,85,724 15.07.2011

1269 106th 16.09.2010 Durgawati Reservoir Project (Revised) Bihar Major 983.10 39,610 08.08.2012

1270 106th 16.09.2010 Maniyari Tank Project - ERM Chattisgarh Major 159.95 64,771 06.12.2010

1271 106th 16.09.2010 Balh Valley (Left Bank) Irrigation project

(Revised)

Himacha

l

Pradesh

Medium 103.78 4,354 05.04.2011

completed in

XI Plan

1272 106th 16.09.2010 Gumani Barrage Project (Revised) Jharkha

nd

Major 185.76 16,194 10.02.2011

completed

with liabilities

in XII Plan

1273 106th 16.09.2010 Kandi Canal extension from Hoshiarpur

to Balachur, Stage-II (Revised)

Punjab Major 540.24 23,326 12.04.2010

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1274 106

th 16.09.2010 Modernisation of Gang Canal system

(Revised)

Rajasthan Major 621.42 281,050(

Adtinl

Irr.96,510)

31.12.2010

completed in

XII Plan

1275 106th 16.09.2010 Badaun Irrigation Project Uttar PradeshNew-

Major

332.12 37,453 18.11.2010

1276 106th 16.09.2010 Bansagar Canal Project (Revised) Uttar PradeshMajor 3148.91 1,50,132 05.12.2010

1277 106th 16.09.2010 Kanhar Irrigation Project Uttar PradeshNew-

Major

652.58 27,898 05.12.2010

1278 106th 16.09.2010 Restoring capacity of Western Gandak

Canal system – ERM

Uttar PradeshMajor 217.12 332,000

(Rstrn.178,000

)

06.12.2010

1279 106th 16.09.2010 Raising & Strengthening to tributary

dyke of Kopilli river from Charaihagi to

Tuklaitup, Basundhari to Killing Kopilli

junction (L/B) and Chapormukh to

Ahotguri Amsoi PWD road including

anti erosion measures at different

reaches.

Assam Flood

Control

110.72 26,000

1280 106th 16.09.2010 Assam integrated Flood & River Bank

erosion Risk Management project

–Dibrugarh Sub Project.

Assam Flood

Control

61.33 32,614

1281 106th 16.09.2010 Assam integrated Flood & River Bank

erosion Risk Management project

–Palasbari Sub Project.

Assam Flood

Control

129.49 65,152

1282 107th 27.10.2010 Raisa Reservoir Scheme Jharkha

nd

New-

Medium

81.11 3,145

10.02.2011

1283 107th 27.10.2010 Tajna Reservoir Scheme Jharkha

nd

New-

Medium

87.76 5,670 10.02.2011

completed

with liabilities

in XII Plan

1284 107th 27.10.2010 Kachhal Irrigation Project Madhya

Pradesh

New-

Medium

62.48 3470 09.03.2011

1285 107th 27.10.2010 Upper Kaketo Irrigation Project Madhya

Pradesh

New-

Medium

196.27 3423 15.04.2011

1286 107th 27.10.2010 Flood protection works along banks of

river Tunga at Shimoga town from Ch

11.754 km to ch. 14.410 km and Mattur

village from Ch. 6.006 km to Ch. 7.036

km in Shimoga District

Karnata

ka

Flood

Control

55.18 11

1287 107th 27.10.2010 Flood protection works for Hemavathi

river (Ch 29.50 km – 31.5 km) at

Holenarasipur in Hassan Distict.

Karnata

ka

Flood

Control

25.48 7

1288 107th 27.10.2010 Flood protection works along left and

right bank of river Rapti in District

Siddarthnagar, Sant Kabir Nagr,

Gorakhpur &Deoria, U. P.

Uttar

Pradesh

Flood

Control

52.29 422.33 sq. km

1289 108th 04.01.2011 Siddhata Irrigation Project (Revised) Himacha

l

Pradesh

Medium 95.29(PL-

2010)

5348 05.04.2011

completed in

XI Plan

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1290 108

th 04.01.2011 Mitigation of Flood in Kuttanad of

Kerala in respect of Phase – I (Group

2to5,7,8 &10to 19)

Kerala Flood

Control

379.05(PL-

2010)

9311

1291 108th 04.01.2011 Indira Sagar (Polavaram) Project

(Revised)

Andhra

Pradesh

Major 16010.45(PL-

2010)

(Irri.9307.54)

436827

1292 108th 04.01.2011 Lower Wardha Project (Revised)

Maharashtra

Major 2232.41(PL-

2008-09)

63333

18.03.2011

1293 108th 04.01.2011 Relining of Indira Gandhi main Canal,

Stage-I (ERM)

Rajasthan Major 401.63(PL-

2010)

71892 28.04.2011

1294 108th 04.01.2011 Indira Gandhi Nahar Project, Stage-II

(Revised)

Rajasthan Major 6921.32(PL-

2010)

901000 08.06.2011

1295 109th 14.03.2011 Phina Singh Irrigation Project Himacha

l

Pradesh

New-

Medium

204.51(PL-

2011)

8472 15.07.2011

1296 109th 14.03.2011 Subernarekha Multipurpose Project

(Revised)

Jharkha

nd

Major 6613.74(PL-

2010)

2,36,84625.05.2011

1297 109th 14.03.2011 Kushalpura Irrigation Project Madhya

Pradesh

New-

Medium

83.975(PL-

2009) 7540 12.08.2011

1298 109th 14.03.2011 Bagharru Irrigation Project Madhya

Pradesh

New-

Medium

50.57(PL-

2009) 3350 12.08.2011

1299 109th 14.03.2011 Rehti Irrigation Project Madhya

Pradesh

New-

Medium

48.77(PL-

2009) 2905 12.08.2011

1300 109th 14.03.2011 Waghur River Project (Revised) Maharas

htra

Major 1183.55(PL-

2009)

164789

(Restoration-

60642 ha)

19.05.2011

1301 109th 14.03.2011 Urmodi Irrigation Project Maharas

htra

New-

Major

1417.75 (PL-

2009-10)

17085

09.06.2011

1302 109th 14.03.2011 Tembhu Lift Irrigation Project Maharas

htra

New-

Major

3450.35 (PL-

2009-10)

7692

09.06.2011

1303 109th 14.03.2011 Bodwad Parisar Sinchan Yojna Maharas

htra

New-

Major

2178.67 (PL-

2009-10)

4,88,682

06.05.2011

1304 109th 14.03.2011 Anti erosion & flood protection work in

Dikrong Basin in Papumpare District

Arunach

al

Pradesh

Flood

Control

23.68(PL-

2010)

2010 1690

1305 109th 14.03.2011 Anti erosion & flood protection work in

Bhareli sub basin in East Kameng

District

Arunach

al

Pradesh

Flood

Control

16.81(PL-

2010)

2010 1000

1306 109th 14.03.2011 Anti erosion & flood protection work in

Siyom Basin in West Siang District

Arunach

al

Pradesh

Flood

Control

29.64(PL-

2010)

2010 2782

1307 109th 14.03.2011 Anti Erosion works along River Ganga

(i) Near village Kasimchak in Danapur

diara on left bank, (ii) Downstream of

Mokama bridge on the left bank, (iii)

Downstream of Vikramshila bridge on

the left bank, (iv) Town protection work

near Patna City and Ramnagar Diara

on the right bank and (v) Near village

Mathurpur Ami on the left bank

Bihar Flood

Control

63.54(PL-

2010)

48280 29.08.2011

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1308 109th 14.03.2011 Anti erosion works at Koerpatti between

27 mile to 32 mile of Champaran

embankement on the left bank of river

Gandak in the District West Champaran

of Bihar

Bihar Flood

Control

19.8(PL-

2011)

2500

1309 109th 14.03.2011 Scheme for breach closure of Saran

embankment, anti erosion works and

raising and strengthening of Pathara

Chharki embankment on river Gandak

in Bihar

Bihar Flood

Control

57.15(PL-

2011)

460 sq.km

1310 109th 14.03.2011 Scheme for flood protection works of

Pipra-Piprasi embankment on right

bank river Gandak

Bihar Flood

Control

21.73(PL-

2010)

323.84 sq.km

1311 109th 14.03.2011 Bagmati Flood Management Project -

Phase II

Bihar Flood

Control

596.51(PL-

2011)

290000

1312 110th 20.07.2011 Rehabiliation, Renovation and

Modernisation of critically damaged

channels of Haryana irrigation network-

ERM

Haryana Major 115.94(PL- 1,46,000 27.01.2012

1313 110th 20.07.2011 Sri Rameshwar Lift Irrigation Scheme Karnata

ka

New-

Major

331.55(PL- 41,052 01-11-2011

1314 110th 20.07.2011 Rajghat Canal Project-ERM Madhya

Pradesh

Major 34.15(PL- 164789 01-11-2011

1315 110th 20.07.2011 Rangwan High Level Canal System-

ERM

Madhya

Pradesh

Major 39.04(PL- 17085 01-11-2011

1316 110th 20.07.2011 Urmil Right Bank canal system-ERM Madhya

Pradesh

Major 45.69(PL- 7692 01-11-2011

1317 110th 20.07.2011 Bembla River Project (Revised) Maharah

stra

Major 2166.35 (PL- 70756 21.09.2011

1318 110th 20.07.2011 Shahnehar Irrigation Project (Revised) Himacha

l

Pradesh

Major 387.17 (PL- 24772 30.11.2011

completed in

XI Plan

1319 110th 20.07.2011 Anti Erosion & Flood Protection work in

Tawangchu basin in Arunachal

Pradesh.

Arunach

al

Pradesh

Flood

Control

36.47

(PL-2010)

4060 ha

(Population-

18400 nos.)

1320 110th 20.07.2011 Protection of Majuli Island from flood

and erosion Phase-II & III.

Assam Flood

Control

115.99

(PL-2010)

1246 sq km 28-11-2011

1321 110th 20.07.2011 Restoration of rivers Dibang and Lohit

to their original corrses at Dholla

Hatighuli course

Assam Flood

Control

54.43

(PL-2010)

16197 ha 28-11-2011

1322 110th 20.07.2011 Flood Protection works for river banks

of Bhadra river (Ch. Km 29.659 - km

31.932) at Bhadravathi town of

Shimoga District

Karnata

ka

Flood

Control

86.16

(PL-2010-11)

22 ha

(Population-

35000.)

1323 110th 20.07.2011 Protection of balat Village from flood

and erosion of river Umngi in west

Khashi Hill District

Assam Flood

Control

5.63

(PL-2008-09)

300 ha

(Population-

3250.)

1324 110th 20.07.2011 Ullal Costal Erosion & Inlet

Improvement Project

Karnata

ka

Coastal

Protectio

n

170.7

(PL-2011)

Protection to

fish

processing

industries

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1325 110

th 20.07.2011 Mirya Bay Coastal Protection Project Maharas

htra

Coastal

Protectio

n

62.51

(PL-2011)

Protection to

fish

processing

industries

1326 111th 17.08.2011 Flood Protection and Training works on

Phyang Nallah

Jammu

&

Kashmir

Flood

Control

58.57

(PL-2010-11)

109.8 ha

Population

:5600 nos.)

1327 111th 17.08.2011 Flood Protection and Training works on

Igoo Nala

Jammu

&

Kashmir

Flood

Control

35.83 (PL

2010-11)

38.25 ha

(Population

:3500 nos.)

1328 111th 17.08.2011 Flood Protection and Training works on

Saboo Nallah

Jammu

&

Kashmir

Flood

Control

47.04 (PL

2010-11)

46.85 ha

(Population

:7700 nos.)

1329 111th 17.08.2011 Flood Protection and Training works on

Ney Basco Nallah

Jammu

&

Kashmir

Flood

Control

59.41(PL

2010-11)

69.60 ha

(Population

:4700 nos.)

1330 111th 17.08.2011 Flood Protection and Training works on

Nimoo Nallah

Jammu

&

Kashmir

Flood

Control

26.25 (PL

2010-11)

39.05 ha

(Population

:3300 nos.)

1331 111th 17.08.2011 Mitigation of floods in Onattukara

Region comprising of 12 watersheds in

Kerala State

Kerala Flood

Control

248.39 (PL-

2010)

5890 ha

(Population:40

322 family)

1332 111th 17.08.2011 Flood Protection works for river banks

of Kabini river (Ch km 0- km1.68) at

Suttur Mutt Township, Najangud Taluk

of Mysore District

Karnata

ka

Flood

Control

26.93 (PL

2010-11)

120 ha

(Population-

6000)

1333 111th 17.08.2011 Protection of Biswanath panpur

including areas of uptram Silamari and

Far downstream Bhumuraguri to

Borgaon aginst erosion of the river

Brahmaputra.

Assam Flood

Control

167.09 (PL

2010-11)

33693 ha

(Population-

1.5 lakh)

1334 112th 14.09.2011 Mahi Right Bank Canal project- ERM Madhya

Pradesh

Major 300.01 1,83,000 ha

(Restoration

8500 ha)

17.05.2012

1335 112th 14.09.2011 Improvement of Kakrapar RBMC (0 to

60.98 km) and Ukai RBMC (0 to 35.06

km) and LBMC system-ERM

Gujarat Major 296.51

( 2009-PL)

134503

(including

restoration of

3500 ha)

13.03.2012

1336 112th 14.09.2011 Upper Kundalika Project- Revised Maharas

htra

Medium 154.916 ( PL

2009-10)

2800 19.12.2011

1337 112th 14.09.2011 Maharashtra Water sector Improvement

Project (MWSIP) (World Bank Aided)-

ERM

Maharas

htra

Major-

ERM

2351.5 (PL

2010-11)

5,16,704 ha

1338 112th 14.09.2011 Flood Protection works of Lendi nalla at

Katol town

Maharas

htra

Flood

Control

24.37 (PL

2009-10)

28 ha

(Population

:808 nos.)

24-10-2011

Restricted to

Rs. 21.11 cr

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1339 112

th 14.09.2011 Flood Protection works for Hemavathi

River at Bankal town and six villages

viz. Bankenhalli, Hydaragudda,

Bakkihalla, Mugrehalli, Kittlegandi and

Subramanya villages (Ch: km 9.41- km

32.3) of midigere Taluk in Chikmangalur

District

Karnata

ka

Flood

Control

47.56 (PL

2010-11)

290 ha

(Population:

1500 person)

25-10-2011

1340 112th 14.09.2011 Stabilization of Seer Khad and Flood

Protection Works from Jahu to Bum

Himacha

l

Pradesh

Flood

Control

23.17 (PL

2010)

12 ha

(Population:

5370 person)

02-11-2011

1341 112th 14.09.2011 Flood Protection works for River Banks

of Ghataprabha river at Gokak Town of

Belgaum District

Karnata

ka

Flood

Control

34.07 (PL

2010-11)

146 ha

(Population:

1400 person)

1342 112th 14.09.2011 Improvement of Storm water Drainage

below Greenfield Airport at Pakyong

Sikkim Flood

Control

48.55 171.43 ha

(Population:

1800 person)

28.11.2011

1343 113th 12.01.2012 Eastern Gandak Canal System

(Gandak Phase-II),

Bihar Mjajor-

New-

ERM

1799.50 1,46,000 12/13.9.12

1344 113th 12.01.2012 Udersthan Barrage & other Iner-

connected and Independent Schemes.

Bihar Major-

New-

ERM

531.01 (Pl

2011-12)

41,052 28.05.2012

1345 113th 12.01.2012 Madhya Pradesh Water Sector

Restructuring Project (MPWSRP)

Madhya

Pradesh

New-

ERM

1919 (PL-

2011-12)

4,88,682 11-05-2012

1346 113th 12.01.2012 Orissa Integrated Irrigated Agriculture

and Water Management Investment

Programme (OIIAWMIP)- Tranche-II

Orissa New-

ERM

471.43 (PL

2010-11)

79863

1347 113th 12.01.2012 Rajgarh Medium Irrigation Project Rajastha

n

New-

Medium

192.13(PL

2010-11)

(irrigation-

140.46,

drinking

water supply-

51.46)

8568 21.09.2012

1348 113th 12.01.2012 Bank Protection Works from Ismailpur

to Bindtoli in downstream of Vikramshila

Bridge on the left bank of river Ganga in

Bhagalpur District.

Bihar Flood

Control

23.39 (PL

2011-12)

90215

(150000 nos)

26.06.2012

1349 113th 12.01.2012 Bagaha Town Protection Works Phase-I

on the left bank of river Gandak in west

Champaran District

Bihar Flood

Control

48.91(PL

2011-12)

4000 ( 100000

nos)

26.06.2012

1350 113th 12.01.2012 Flood Protection Works along left and

right banks of river Beas in Districts

Gurdaspur, Hoshiarpur and kapurthala.

Punjab Flood

Control

46.12 (PL

2009)

1800 (

225000)

22-05-2012

1351 113th 12.01.2012 Purna Barrage (Ner Dhamana)

Irrigation Project.(Revised)

Maharas

htra

Medium

Revised

617.46 (PL

2009-10)

7024 26.03.2012

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1352 114th 28.03.2012 Raising and Strengthening of Adhwara

and Khiroi left embankment from RD

0.0 Km to RD 43.60 Km & from RD

44.00 Km to RD 90.50 Km. and Right

embankment from RD 0.0 Km to RD

81.50 Km in Sitamarhi, Madhubani and

Darbhanga districts of Bihar.

Bihar New-

Flood

Control

167.03

(PL-2011)

141760 ha./

17,32,000 nos.

1353 114th 28.03.2012 "Improvement of embankment and

ancillary works in Kandi and other

adjoining areas of the districts of

Murshidabad"

West

Bengal

New-

Flood

Control

438.94

( PL-2011)

51000 ha./

5,00,000 nos.

13.06.2012

1354 114th 28.03.2012 Construction of Mahadewa- uska

embankment along right bank of river

Kunra in Siddharthnagar district of Uttar

Pradesh ( Scope

Change)

Uttar

Pradesh

Revised-

Flood

Control

27.76

(PL-2008-09)

1924 ha./

16184 nos.

1355 114th 28.03.2012 Construction of Balrampur-Bhadaria

embankment along right bank of river

Rapti in Balrampur district of Uttar

Pradesh

Uttar

Pradesh

Revised-

Flood

Control

25.61

(PL- 2008-

09)

14373 ha./

56000nos.

1356 115th 24.07.2012 Andhra Pradesh Irrigation and

Livelihood Improvement Project

Andhra

Pradesh

Major -

ERM

1131.136

(Pl 2010-11)

1,14,878

1357 115th 24.07.2012 Restoration of Western Gandak Canal

System, (Saran Main Canal &Its

Distribution System)

Bihar New -

Major -

ERM

2169.51

( PL -2011-

12)

4,78,000

1358 115th 24.07.2012 Minimata (Hasdeo) Bango Project Chhattis

garh

Major -

ERM

492.31

( PL- 2011-

12)

45,116

restoration

1359 115th 24.07.2012 Medium Irrigation Project to Nadaun

Area in Tahsil - Nadaun, District -

Hamirpur

Himacha

l

Pradesh

Medium -

New

97.59(PL-

Jun,2011)

6,471 25.03.2013

1360 115th 24.07.2012 Mahuar Medium Irrigation Project Madhya

Pradesh

New -

Medium

191.2707 (PL-

2009)

13,775

1361 115th 24.07.2012 Bilgaon Irrigation Project Madhya

Pradesh

New -

Medium

182.22 (PL-

2009)

12,285 14.12.2012

1362 115th 24.07.2012 Thoubal Multipurpose Project Manipur Revised -

Major

1387.85 (PL-

2011)

33,38712.09.2012

1363 115th 24.07.2012 Khuga Multipurpose Project Manipur Revised-

Medium

433.91 (

PL-2011)

14,75519.09.2012

1364 115th 24.07.2012 Dolaithabi Barrage Project Manipur Revised-

Medium

360.05 (PL-

2011)

7,54520.09.2012

1365 115th 24.07.2012 Imphal Barrage Project Manipur ERM-

Medium

16.8 (PL-

2011)

6,400

1366 115th 24.07.2012 Sekmal Barrage Project Manipur ERM-

Medium

10.2 (PL-

2011)

8,500

1367 115th 24.07.2012 Revised Estimate of Rehabilitation of

1st Patiala Feeder & Kotla Branch with

20% enhanced capacity and changed

value of "N"

Punjab Revised-

Major

199.39(PL-

2011-12)

3,34,109

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1368 115th 24.07.2012 Construction of Lining of Tumaria-

Bahalla & Naktiya Feeder

Uttarkhand ERM-

Medium

11.2

(PL-2010-11)

7,890

restoaration

2,54 and

Add.creation1

0 ha

14.12.2012

1369 116th 14.12.2012 Anti erosion works from km 0.650 of

Retired bund -1 of Sakraur Bhikharipur

Ring bund to km 13.600 of Main bund

of Sakraur Bhikharipur along left bank

of river Sarayu/Ghaghra in Gonda

district

Uttar

Pradesh

Flood

Control .

41.51(PL-

2010)

2675 ha,

Population

18430

1370 116th 14.12.2012 Construction of Marginal Embankment

upstream of Elgin bridge along right

bank of river Ghaghra in the district of

Barabanki

Uttar

Pradesh

Flood

Control .

170.08(PL-

2010)

44,250 ha,

Population

334680

1371 116th 14.12.2012 Flood protection works along left benk

of river Ghaghra in the disrict of Basti

Uttar

Pradesh

Flood

Control .

80.24(PL-

2010)

24743 ha,

Population

496480

1372 116th 14.12.2012 ERM of Malan Canal System Uttarakh

and

ERM-

Medium

11.40

( PL-2010-

11)

3984 ha

(Restoration

753 ha

and Additional

creation 41

ha)

1373 116th 14.12.2012 Lakhwar Multipurpose project Uttarakh

and

Multipurp

ose

3966.51

(PL- 2012)

33,780

1374 117th 21.03.2013 Protection of Brahmaputra dyke from

Sissikalghar to Tekeliphuta at different

reaches from Lotasur to Tekeliphuta

from the erosion of river Brahmaputra

(review)

Assam Flood

control

155.87 (PL

2011-12) Area

protected =

10117 ha &

Population

5,00,000

1375 117th 21.03.2013 Delija Dewada Medium Irrigation project Madhya

Pradesh

NEW

Medium -

ERM

17.49 (PL

2009)

7200

(Restoration

3600)

1376 117th 21.03.2013 Anandapur Barrage project (Phase -II )

of Odisha (Integrated Anandapur

Barrage Project)

Orissa Major -

Revised

1457.63 (PL

2010-11)

56,720

1377 117th 21.03.2013 Salandi Sanskar Project of Odisha

(Integrated Anandapur Barrage

Project).

Orissa Major -

Revised

145.77 (PL

2010-11)

Annual

irrigan=7822

ha, Area

protected =

250000 ha &

Population

13,50,000

1378 117th 21.03.2013 Madhya Ganga Canal project Stage

-II

Uttar

Pradesh

Major -

Revised

2865.11 (PL

2011)

1,46,532 21.06.2013

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1379 117th 21.03.2013

River Training works (Marginal Bunds &

Studs) for protection of population and

Agriculture Land , situated along both

banks of River Solani of villages

Rampur , Ibrhimpur , Solanipuram,

Jamalpur etc in district Haridwar.

Uttarakh

and

Flood

control

33.19

(PL 2012-

13.)

Area

protected =

475 ha &

Population

40,000

1380 118th 30.07.2013 Scheme for Extension of Embankment

from Manoubar to Phuhia with

protection work at vulnerable points and

brick Soling Road on top of

embankment in between 96.50 km to

110.48 km of Right Kamla Balan

embankment in Darbhanga, Saharsa

and Samastipur Districts in Bihar.

Bihar Flood

control

56.65 (PL-

Oct,2012)

Area

protected =

0.46 lakh &

Population

225000

18.11.2013

1381 118th 30.07.2013 Bagmati Flood Management Scheme

Phase-IV (a)

Bihar Flood

control

73.45 (PL-

Oct,2012)

Area

protected =

4.39 lakh &

Population

340000

18.11.2013

1382 118th 30.07.2013 Anti-Erosion work for Restoration of

Spur No.2,3,4,5 & 7: Boulder

Revetment at toe of embankment in

upstream and downstream of Spur No.6

in a length of 800m with 4 Nos.

additional Spur in Ismailpur - Bindtoli

Embankment on left bank of river

Ganga.

Bihar Flood

control

38.83 (PL-

Oct,2012)

Area

protected =

42428 ha. &

Population

200000

18.11.2013

1383 118th 30.07.2013 Bagaha Town Protection scheme

(Phase-II) on the left bank of river

Gandak in West Champaran district of

Bihar

Bihar Flood

control

59.46 (PL-

Oct,2012)

Area

protected =

2500 ha. &

Population

100000

18.11.2013

1384 118th 30.07.2013 Project for construction of studs and

marginal bund for protection of

population and agricultural land of

villages situated at Banks of river

Ganga in District Haridwar

Uttarakh

and

Flood

control

34.85

(PL-2012-13)

Area

protected =

4344 ha. &

Population

12360

07.08.2013

Planning

Commission

has

approved for

Rs.33.19 Cr.

1385 118th 30.07.2013 Swan River Flood Management Project

from Daulatpur bridge to Gagret bridge

in main Swan river & all tributories

joining main Swan river from Gagret

bridge to Santokhgarh bridge

Himacha

l

Pradesh

Flood

control

922.485 (PL-

March,2013)

Area

protected =

7163.49 ha. &

Population

235834

20.09.2013

1386 118th 30.07.2013 Project for Channelisation of

Chhounchh Khad in Tehsil Indora,

District Kangra, Himachal Pradesh

Himacha

l

Pradesh

Flood

control

179.59 (PL-

March,2013)

Area

protected =

1740.30 ha. &

Population

8175

14.10.2013

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1387 118th 30.07.2013 Flood Management of River Dikrong

along with river training works on both

banks Embankment in Lakhimpur

Districts of Assam.

Assam Flood

control

105.96 (PL-

2011-12)

Area

protected =

9998 ha. &

Population

210700

1388 118th 30.07.2013 Flood Management of river Ranganadi

along with River Training works on both

bank embankments in Lakhimpur

District (Assam)

Assam Flood

control

361.42

(PL-2011-12)

Area

protected =

21056 ha. &

Population

398275

1389 119th 29.08.2013 Flood Protection works to be executed

along Indo Pak border on river Ravi &

it's tributary Ujh, to check land erosion

for the safety of village Abadies, border

fencing and other defense installations

Punjab Flood

control

161.05 (PL-

Dec,2011)

Area

protected =

55597 ha. &

Population

18000

07.10.2013

1390 119th 29.08.2013 Dhansiri Irrigation Project Assam Major -

Revised

567.05

(PL-2011-12)

83366

1391 119th 29.08.2013 Singda Multipurpose Project Manipur Medium-

ERM

34.62

(PL-2011-12)

3000 10.12.2013

1392 119th 29.08.2013 Lift Canal system of Upper Indravati

Irrigation Project

odisha Major -

New

986.71

(PL-2012-13)

43047

1393 119th 29.08.2013 Lower Indra Irrigation Project odisha Major -

Revised

1624.49

(PL-2012-13)

38870

1394 119th 29.08.2013 Ret Medium Irrigation Project odisha Medium -

Revised

433.39

(PL-2012)

9775

1395 120th 13.09.2013 Proposed Flood Protection works along

left bank of river Yamuna in district

Baghpat and Ghaziabad

Uttar PradeshFlood

control

44.89

(PL-

Nov,2012)

Area

protected =

5600 ha. &

Population

120000

08.11.2013

1396 120th 13.09.2013 Anti-Erosion Work along the bank of

river Haura for protection of vulnerable

locations from Chapaknagr to Baldakhal

under Sadar Sub-Division of West

Tripura District

Tripura Flood

control

42.96

(PL-2011)

Area

protected =

1959 ha. &

Population

18337

1397 120th 13.09.2013 Parwan Irrigation cum drinking water

supply scheme

RajasthanMajor -

New

2435.93

(PL-2011-12)

99864

1398 121st 08.10.2013 ERM of Narayanpur Left Bank Canal

System, Karnataka

Karnata

ka

Major-

ERM

3752.18

(2012-13)

408703

(Restoration

142580)

1399 121st 08.10.2013 Upper Tunga Project Karnata

ka

Major-

New

2561.88

(2012-13)

94,698

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1400 121st 08.10.2013 Anti- Erosion Work along the bank of

river Khowai for protection of vulnerable

locations from Netajinagar (Brahma

Cherra) to Banglahour under Teliamura

Sub Division and from South L.N.Pur to

Paharmura Bridge under Khowai Sub

Division of West Tripura District.

Tripura Flood

control

91.02

(2011)

Area

protected =

4256 ha. &

Population

38693

1401 121st 08.10.2013 Anti- Erosion Work along the bank of

river Gumti for protection of vulnerable

locations from Dalak Samatal Para to

Durgapur under Amarpur, Udaipur and

Sonamura Sub Division of South

Tripura & West Tripura District

Tripura Flood

control

54.99

(2011)

Area

protected =

2209 ha. &

Population

25326

1402 122nd 20.12.2013 Rukura Medium Irrigation Project Odisha Medium-

Revised

256.09

(2013)

5,750

1403 122nd 20.12.2013 Loktak Lift Irrigation Scheme Manipur Major-

ERM

25.56

(2011)

24000

(Restoration

12600)

1404 122nd 20.12.13 Mahi Irrigation Project Madhya

Pradesh

Major-

Revised

834.24

(2009)

28,127

1405 123rd 30.01.2014 Karanja Irrigation Project Karnata

ka

Major-

Revised

635.18

(2012-13)

29,227

1406 123rd 30.01.2014 Kanupur Irrigation Project Odisha Major-

Revised

1801.25

(2013)

47,709

1407 123rd 30.01.2014 Rengali Irrigation Sub Project -Right

Bank Canal

Odisha Major-

Revised

1962.33

(2013)

1,43,490

1408 123rd 30.01.2014 Subarnarekha Irrigation Project Odisha Major-

Revised

5561.57

(2013-14)

1,87,462

1409 123rd 30.01.2014 Thoubal Multipurpose Project Manipur Major-

Revised

1694.27

(2011)

35,160

26.02.2014

1410 123rd 30.01.2014 Flood Protection Scheme to Protect

Villages, Canals and Roads from River

Koshi in Betal ghat Block, District

Nainital

Uttarakh

and

Flood

Control

31.21

(2011-12)

500 ha,

Population-

10,000

21.03.2014

1411 123rd 30.01.2014

Project for Flood Protection Work along

River Song and its Tributaries from D/S

of the Confluence of River Jakhan and

River Song upto Ganga river in Doiwala

Block of District Dehradun

Uttarakh

and

Flood

Control

34.26

(2012-13)

181.3 ha,

Population-

4725

1412 123rd 30.01.2014 Project Report for River Jakhan from

village Rani Pokhari to Confluence with

Song River in Doiwala Block of District

Dehradun

Uttarakh

and

Flood

Control

33.95

(2012-13)

229.50 ha,

Population-

4725

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1413 123rd 30.01.2014 Flood Protection Work of Bindal River

from Cantt. Road to Mothronwala in

District Dehradun

Uttarakh

and

Flood

Control

46.4216

(2012-13)

57.55 ha,

Population-

25,000

1414 123rd 30.01.2014 Project for Flood Protection Work along

Suswa River in Doiwala Block of District

Dehradun

Uttarakh

and

Flood

Control

98.00

(2012-13)

1865 ha,

People-40,000

1415 123rd 30.01.2014 Karnataka Integrated and sustainable

Water Resources Management

Investment Program (KISWRMIP),

Tranche-1

Karnata

ka

Medium

ERM

118.75

(2012-13)

7,500

1416 124th 16.10.2014 Integrated Flood and River Bank

Erosion Management Works at

Rohmoria

Assam Flood

Control

78.48 (2013-

14)

36000

Population -

1,80,000

1417 124th 16.10.2014 Bagaha town protection works (Phase-I)

on the left bank of river Gandak in West

Champaran District

Bihar Flood

Control

90.78 (2013-

14)

4000

Population -

1,00,000

1418 124th 16.10.2014 Bagaha Town Protection Scheme

(Phase-III) on the left bank of river

Gandak in West Champaran district

Bihar Flood

Control

75.71 (2012) 2500

Population -

1,00,000

1419 124th 16.10.2014 Modernisation of Thannermukkom

Barrage

Kerala Flood

Control

255.34

(2012)

55874.38

Population -

14,00,000

1420 124th 16.10.2014 Kachhal Irrigation Project Madhya

Pradesh

Revised-

Medium

91.39 (2009) 3,470

1421 124th 16.10.2014 Telengiri Irrigation Project Odisha Medium-

Revised

613.71

(2013)

13,829

1422 124th 16.10.2014 Rengali Irrigation sub-project LBC-II

(RD 29.177 Km to 141.00 Km)

Odisha Major-

Revised

3603.67

(2013)

177651

1423 124th 16.10.2014 Kanhar Irrigation Project Uttar

Pradesh

Major-

Revised

2252.29(201

3-14)

35467

1424 124th 16.10.2014 Project for construction of Marginal

bund in Ramraj Khadar along right bank

of river Ganga in the District of

Muzaffarnagar

Uttar

Pradesh

Flood

Control

29.39

(2012) 7500

Population-

40,000

1425 124th 16.10.2014 Protection Work on both bank of

Bhagirathi river at Uttarkashi in District

Uttarkashi

Uttarkha

nd

Flood

Control

48.814

(2013)

13.50

105 Houses

1426 124th 16.10.2014 River Training Works including

miscellaneous associated works on

both banks of Bhagirathi river as per

requirement from Jhulapul to Tioth

bridge execluding proposed works on

left from Tiloth bridge to Switchyard of

Maneri Bhali-I at Uttarkashi

Uttarkha

nd

Flood

Control

76.71 (2013) 37.50

165 Houses

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1427 124th 16.10.2014 Project for construction of Studs and

Marginal Bund for protection of

population and agricultural land from

Banjarewala to Alawalpur villages

situated at banks of River Solani in

Distt. Haridwar,

Uttarkha

nd

Flood

Control

38.898

(2014)

707

Population-

23068

1428 124th 16.10.2014 Flood Protection Scheme of Villages

from Dakpathar Barrage to NH-72

Kulhal Paonta Sahib Bridge from River

Yamuna (Left Bank) in Vikasnagar

Block Distt. Dehradun,

Uttarkha

nd

Flood

Control

77.349

(2014)

400

Population

protected

10850

1429 124th 16.10.2014 Project for Anti-Erosion & drainage work

of Udmadi Rao Nala from Village-Kheda

Pachhawa to Village-Fatehpur (Aasan

River) in Vikasnagar Block Distt.-

Dehradun,

Uttarkha

nd

Flood

Control

34.05 (2014) 270

Population

Protected

2200

1430 124th 16.10.2014 Project for Flood Protection Works from

Hilly Shivalik Range Originated Nalas

(Between Villages Sekhuwala to

Prateetpur) in Vikasnagar Block Distt.-

Dehradun,

Uttarkha

nd

Flood

Control

31.25 (2014) 178

Population

Protected

20000

1431 124th 16.10.2014 Scheme for Flood protection of the

villages from River Asaan (Between

Sahaspur-Sabhawala Bridge to Kunja

Grant) in Vikasnagar Block, Distt-

Dehradun,

Uttarkha

nd

Flood

Control

57.74 (2014) 220

Population

Protected

1850

1432 125th 25.05.2015 Borolia Irrigation Project Assam Medium-

Revised

Cost

157.03

(PL 2013)

13562

1433 125th 25.05.2015 Modernisation of Tunga Anicut Canal

Network

Karnata

ka

ERM,

Medium

239.75 (PL

2012-13)

11732

1434 125th 25.05.2015 Modernisation of canal system of

Bhadra reservoir Project

Karnata

ka

ERM,

Major,

Revised

1175.79

(PL 2014)

177337

1435 125th 25.05.2015 Sonthi Lift Irrigation Scheme Karnata

ka

Major 673.9

(PL 2013-14)

16800

1436 125th 25.05.2015 ERM of Rajghat Canal Project Madhya

Pradesh

ERM,

Major,

Revised

56.83

(PL 2014-15)

164789

1437 125th 25.05.2015 Dolaithabi Barrage Project Manipur Medium

Irrigation,

Revised

509.70 Cr.

(PL 2013)

7545

1438 125th 25.05.2015 Anti-erosion work near Khairpur,

Raghopur, Akidatpur and Shankarpur

villages on the left bank of river Ganga.

Restoration of spur and maintanence of

service road and approach road.

Bihar Flood

Control

70.68

(PL 2012)

Area

Protected=182

85.714

Population

protected = 1439 125th 25.05.2015 Channelisation of River Pabbar from

Tikkari to Hatkoti, Tahsil Rorhu, Distt.

Shimla

Himacha

l

Pradesh

Flood

Control

190.82

(PL 2014)

Area

Protected -

177

Houses

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1440 125th 25.05.2015 Swan River Flood Management Project

Downstream of Santokhgarh Bridge

Upto H.P –Punjab Boundary

Himacha

l

Pradesh

Flood

Control

46.8

(PL 2013-14)

Area

Protected -

477.5

Population

Benefitted- 1441 125th 25.05.2015 Project Report for priority works-

Comprehensive plan for Flood

management works on Jhelum, Phase-I

Jammu

&

Kashmir

Flood

Control

399.29

(PL 2014)

Area

Protected -

33613

Population

Benefitted-

1442 125th 25.05.2015 Project for construction of Aile Persauli

Lolpur bund on the left bank of river

Ghagra/ Saryu in Gonda district of Uttar

Pradesh

Uttar

Pradesh

Flood

Control

43.55

(PL 2014)

Area

Benefitted -

32815.74

Population

Benefitted-

112410

1443 125th 25.05.2015 Phase-I works of Ghatal Master Plan in

Paschim Medinipur and Purba

Medinipur districts of West Bengal

West

Bengal

Flood

Control

1214.92

(PL 2013-14)

Area

Benefitted -

65700

(Approx.)

Population

Benefitted-

8,74,000

1444 126th 16.07.2015 Formation of Flood Carrier Canal from

Kannadian Channel to drought prone

area of Sathankulam, Thisaiyanvilay by

interlinking Tamirabarani, Karumediyar

and Nambiyar Rivers in Tirunelveli and

Thoothukudi Districts, Tamil Nadu

Tamil

Nadu

Major

Irrigation

872.45 Cr.

(PL 2014-15)

23040

1445 126th 16.07.2015 Revised detailed project report for

construction of embankments along

river Jhim and Jamura (Adhwara

Group) from Sonbarsa Bajar to

Sonbarsa village in Sitamarhi District,

Bihar.

Bihar Flood

Control

134.20 Cr.

(PL 2013-14)

Area

protected =

17400 ha. &

Population

5.26 lakh

1446 126th 16.07.2015 Revised Bagmati Flood Management

Scheme Phase-II

Bihar Flood

Control

1283.50 Cr.

(PL 2012)

Area

protected =

3.13 lakh ha.

& Population

123.85 lakh

1447 126th 16.07.2015 Bagmati Flood Management Scheme

Phase-III (a)

Bihar Flood

Control

912.45 Cr.

(PL 2013-14)

Area

protected =

2.90 lakh ha.

& Population

12 lakh

1448 127th 13.11.2015 Anti-erosion work on the right bank of

the Ganga river from Rafatola to

Srighar 10 Nos. in Sahibganj District

Jharkha

nd

Flood

Control

52.63 cr. Area protected

= 3700 ha

Population

Benefitted =

85,000

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1449 127th 13.11.2015 Revised Cost Estimate of Extension,

Renovation and Modernisation of

canals being fed from river Sutlej

Punjab Major -

ERM,

Revised

Cost

918.25

(PL 2013-14)

207068

1450 127th 13.11.2015 Revised Cost Estimate of Relining of

Sirhind Feeder from RD 119700 to

447927, Punjab

Punjab Major -

ERM,

Revised

Cost

671.478

(PL 2015)

69086

1451 127th 13.11.2015 Revised Cost Estimate of Relining of

Rajasthan Feeder from RD 179000 to

496000, Punjab

Punjab Major -

ERM,

Revised

Cost

1305.267

(PL 2015)

98739

1452 128th 29.02.2016 Jigaon Irrigation Project Maharas

htra

New,

Major

5708.11 (PL

2014-15)

101088

1453 128th 29.02.2016 Indiramma Flood Flow Canal Project Telanga

na

Revised -

Major

5940.09 (PL

2015-16)

93587

1454 128th 29.02.2016 Sulwade Jamphal Kanoli Lift Irrigation

Scheme

Maharas

htra

New -

Major

2374.46 Cr.

(PL 2014-15)

52720

1455 128th 29.02.2016 Scheme for protection of Haha Nala

Bund, Chainpur Gulaura pump canal &

Shiv Mandir at village Chainpur Gulaura

between 0.800Km to 2.400 Km of Haha

Nala bund, Protection of village group

Sangapur, Gorauli, Kakarghatta

between 39.800 Km to 41.600 Km of

Turtipar-Shrinagar bund & protection of

Bakulaha Sansar Tola bund and village

group of Ibrahimabad Naubrar between

4.800 Km to 5.175 of B.S.T. bund on

right bank of river Ghaghra in district

Ballia of Uttar Pradesh

Uttar

Pradesh

Flood

Control

47.3882 Cr

(PL 2013)

Area protected

= 11120 ha

Population

Benefitted =

89870

1456 128th 29.02.2016 Scheme for construction of Bairiya

Sarya Bund on right bank of River-Rapti

in the district-Gorakhpur of Uttar

Pradesh.

Uttar

Pradesh

Flood

Control

75.8219 Cr

(PL 2013)

Area protected

= 9640.5 ha

Population

Benefitted =

30000

1457 128th 29.02.2016 Scheme for construction of

Embankment from village Joulpur to

Patwayee (From 0.000 Km to 28.500

Km) on left Bank of River Kosi in

Rampur district, Uttar Pradesh.

Uttar

Pradesh

Flood

Control

66.63 Cr (PL

2013-14)

Area protected

= 9970 ha

Population

Benefitted =

40700

1458 128th 29.02.2016 Scheme for protection of Gaura-

Saifabad embankment between Km.

3.000 to 4.400 on left bank of River-

Ghaghra in the district - Basti of Uttar

Pradesh

Uttar

Pradesh

Flood

Control

33.9885 Cr

(PL 2012)

Area protected

= 6435 ha

Population

Benefitted =

130000

Sl. Meet

ing

Num

ber

Date of

Meeting

Project Name Name

of the

State

Major/

Medium

Estimated

Cost in

crore

Benefits in

ha

Date of

Approval

by

Planning

Commissio

n1459 128th 29.02.2016 Scheme for construction of 7nos. Spurs

at Km. 12.500, 13.200, 14.200, 15.100,

15.750, 16.200 & 16.600 of Kalwari-

Rampur Bund on left bank of river

Ghaghra in the district-Basti, Uttar

Pradesh

Uttar

Pradesh

Flood

Control

29.5997 Cr

(PL 2012)

Area protected

= 15850 ha

Population

Benefitted =

180000

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

1472

71

1543

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

Total Flood

Control

projects 216