TEN-T 2012 Multi-Annual Call

Proposal for an Implementing Decision on the selection of projects

July 2013

Trans-European Transport Network Executive Agency (TEN-T EA)

European Commission - Directorate General for Mobility and Transport

http://tentea.ec.europa.eu

http://ec.europa.eu/transport

Table of Contents

Introduction ..............................................................................................................................................................................4

1. The legal framework and political context of the 2012 Multi-Annual Call for Proposals ..............5

2. Key elements of proposals received under the 2012 Multi-Annual Call for Proposals ...................71. General overview ...............................................................................................................................................................................................72. Budgetary features ...........................................................................................................................................................................................73. The selection of proposals ...........................................................................................................................................................................74. TEN-T Funding – Map representations of the proposals recommended for funding ...............................................105. List of proposals recommended for funding ..................................................................................................................................186. List of proposals NOT recommended for funding ........................................................................................................................26

3. Info Sheets of project proposals submitted under the 2012 TEN-T Multi-Annual Call for Proposals ................................................................................................................................................................................341. Info sheets of proposals recommended for funding ..................................................................................................................352. Info sheets of proposals NOT recommended for funding ....................................................................................................131

4

Introduction

Since 1995, the European Union has the possibility of granting financial aid to projects of common interest included in the EU Guidelines for the development of the Trans-European Transport Network (TEN-T). The TEN Regulation1 of the European Parliament and of the Council, adopted in 2007, enables the Commission to contribute more efficiently and effectively to the financing of the highest priorities of the TEN-T. Under the 2007-2013 financing framework, the entire €8,013 million budget has been allocated to date. The allocated funds have been contributing to the gradual implementation of this network. Under the Multi-annual programme (80 to 85% of the available budgetary resources) the TEN Regulation provides for a strong concentration of available funds on the TEN-T Priority Projects approved in 2004 and on projects in the field of traffic management, and promotes in particular the enhanced sup-port of cross-border sections along the Priority Projects. Amongst the supported projects are actions of key European added value such as cross-border sections and key bottlenecks of the TEN-T as well as horizontal priorities. In ad-dition the assistance of European Co-ordinators on certain Priority Projects, help to overcome difficulties through ‘non-financial’ action.

Under the Annual work programme (15 to 20% of the available budgetary resources) the TEN Regulation provides the financing of a large number of smaller projects covering the different modes of transport. They projects are also hav-ing significant effects on the achievement of the EU’s objectives in this area, notably through project pipeline prepa-ration (feasibility studies, impact assessment and design studies). Much has thus already been achieved through the joint funding of important TEN-T projects by Member States and the EU. On this basis the Commission, in coordination with the TEN-T Executive Agency (TEN-T EA), published on 28 November 2012 under the Multi-annual Programme a Call for proposals2 with a total indicative budget of €1,347 million3 broken down to the following fields:

•AirTrafficManagement(ATM)withanindicativebudgetof€50million;•EuropeanRailTrafficManagementSystems(ERTMS)withanindicativebudgetof€100million;•IntelligentTransportSystems(ITS),includingEuropeanElectronicTollService(EETS)withanindicativebudgetof€50million;•MotorwaysoftheSea(MoS)withatotalindicativebudgetof€80million;•RiverInformationServices(RIS)withanindicativebudgetof€10million;•PriorityProjects(PPs)withatotalindicativebudgetof€1,057million.

This call is based on the TEN Regulation as well as the specific Commission Implementing Decisions on the Multi-an-nual Work Programmes for grants in the field of the TEN-T network for 2012 and 20134, which were adopted through the Comitology procedure in November 2012 and March 2013 respectively. Under this call, a total of 197 project proposals were received, of which 189 fulfilled the formal eligibility criteria. In evaluating these proposals, the Com-mission, in collaboration with the TEN-T Executive Agency, strictly applied the criteria set out in the TEN Regulation and in the 2012 and 2013 Multi-annual Work Programmes. The involvement of external experts in the evaluation of all eligible proposals enhanced the objectivity and technical quality of the overall selection process. The Commission, with the support of the TEN-T Executive Agency, has completed the evaluation and selection process of proposals on the basis of the TEN-T 2012 and 2013 Multi-annual Work Programmes. It intends to adopt a decision that sets out the results of this process, i.e. a decision that, in accordance with Article 9 of the TEN Regulation, establishes the projects to be selected under the 2012 and 2013 Multi-annual Work Programmes and the amounts of financial aid to be granted to these projects. The Commission is confident that the funding proposal outlined on the following pages responds, in the best possible way, to key transport and TEN-T policy objectives, and that it contributes to supporting EU action in the field of the Trans-European Transport Network. The first part of this brochure sets the legal frame-work and political context of the 2012 Multi-annual call. The second part presents the key elements of the proposals received under the call in the targeted fields. It contains information on the selection process and its outcome as well as information about the individual proposals including maps for the proposals recommended for funding. Finally, the brochure also includes lists of proposals recommended and not recommended for funding.

1 Regulation (EC) 680/2007 of the European Parliament and of the Council of 20 June 2007, laying down general rules for the granting of EU financial aid in the field of the trans-European transport and energy networks as amended by Regulation 670/2012 of the European Parliament and of the Council of 11 July 2012

2 EN Official Journal of the European Union C 368/16, 28 November 2012

3 €1,015 million were allocated through the amendment of the 2012 Work Programme and another €332 million through the 2013 Multi-annual Work Programme

4 Commission Decision C(2012)1574 as amended by Commission Decision C(2012) 8508, as well as 2013 Multi-annual Work Programme C (2013)1675 adopted on 21 March 2013

5

1. The legal framework and political context of the 2012 Multi-Annual Call for Proposals

In coherence with Regulation (EC) No 680/2007 of the European Parliament and the Council laying down general rules for the granting of EU financial aid in the field of Trans-European Networks (the ‘TEN Regulation’), the Commis-sion Decision C(2012) 1574 as amended by Commission Decision C(2012) 8508 of 27 November 2012, as well as the 2013 Multi-annual Work Programme1 adopted on 21 March 2013 established the 2012 and 2013 Multi-annual Work Programmes for granting financial aid in the field of the Trans-European Transport Network (TEN-T). These Multi-annual Work Programmes led to the publication on 28 November 2012 of a Call for proposals in the framework of TEN-T (published in the Official Journal of the European Union C 368/16 on 28 November 2012).

The Work Programmes and the amendment, where applicable, include a total amount of €1,347 million broken down in the following fields:

•AirTrafficManagement(ATM)withanindicativebudgetof€50million;•EuropeanRailTrafficManagementSystems(ERTMS)withanindicativebudgetof€100million;•IntelligentTransportSystems(ITS),includingEuropeanElectronicTollService(EETS)withanindicativebudgetof€50million;•MotorwaysoftheSea(MoS)withatotalindicativebudgetof€80million;•RiverInformationServices(RIS)withanindicativebudgetof€10million;•PriorityProjects(PPs)withatotalindicativebudgetof€1,057million.

The objectives of each field were defined in the 2012 Multi-annual Work Programme and its amendment:

Air Traffic Management (ATM)The objective in this area is to implement Single European Sky and ATM modernisation objectives based on the restructuring of European airspace and the way in which it is organised and managed (Functional Airspace Blocks) and on the implementation of the technologies and procedures to modernise the European ATM system (SESAR pro-gramme).

The creation of Functional Airspace Blocks is a key step in the reduction of fragmentation and the consolidation of air traffic service provision in the medium term through the reorganisation of airspace and the way in which it is man-aged. It will necessitate the rationalisation of infrastructure and the achievement of a harmonised technical baseline. It constitutes a transitional phase for the restructuring of ATM in the EU and will facilitate the implementation of the SESAR systems in the longer term.

The objective of the SESAR programme is the modernisation of the ATM systems through the definition, develop-ment, validation and implementation of new ATM infrastructure in Europe to increase capacity, enhance safety and interoperability and reduce environmental impact to meet traffic growth to 2020 and beyond.

European Rail Traffic Management Systems (ERTMS)The overall objective, based on Article 10 of the TEN-T Guidelines, is to promote the deployment of the European Rail Traffic Management System (ERTMS) which today consists of two components GSM-R and ETCS (the European Train Control System).

Through the elimination of technical barriers to interoperability, the deployment of ERTMS will directly contribute to the achievement of key transport policy objectives such as: the establishment of major interoperable transport axes interconnecting national networks and facilitating the functioning of the internal market; the optimal use of existing infrastructure capacities; improving the safety and reliability of the network; enhancing accessibility of peripheral areas of the Union; facilitating congestion relief on rail infrastructure and more balanced modal distribution; savings in terms of the environmental effects of transport.

1 C (2013)1675

6

Intelligent Transport Systems (ITS), including the European Electronic Toll Service (EETS)The priorities for ITS including EETS are:

•The“optimisationofthecapacityandefficiencyofexistingandnewinfrastructure,promotionofintermodalityandimprovementofthesafetyandreliabilityofthenetworkbyestablishingandimprovingintermodalterminalsandtheiraccessinfrastructureand/orbydeployingintelligentsystems(art.5oftheTENguidelines);•“Thenetworkshallalsoincludeinfrastructurefortrafficmanagement,userinformation,dealingwithincidentsandemergenciesandelectronicfeecollection,suchinfrastructurebeingbasedonactivecooperationbetweentrafficmanagementsystemsatEuropean,nationalandregionallevelandprovidersoftravelandtrafficinformationandvalueaddedservices,whichwillensurethenecessarycomplementaritywithapplicationswhosedeploymentisfacilitatedunderthetrans-Europeantelecommunicationsnetworksprogramme.”(art.9oftheTENGuidelines).

River Information Services (RIS)The overall objective, based on Article 11.5 and 16 of the TEN Guidelines, is to foster the deployment of “RIS Intel-ligent Infrastructure”, reflecting a European wide harmonised implementation of River Information Services (RIS), regulated through Directive 2005/44/EC2 which defines binding rules for data communication and RIS equipment as well as the minimum level of RIS Services for future RIS implementations. The Directive provides the framework for the deployment of harmonised and interoperable RIS systems and services across Europe.

For the programming period of 2007-2013, projects shall focus on the deployment of enabling infrastructure and on the provision of River Information Services. The multiplicity of these services requires a high level of interoperability and compatibility of the services themselves, of the enabling technologies behind and of the related processes.

In order to support the co-ordinated implementation of RIS in Europe, the TEN-T RIS Masterplan inventorised national ongoing and planned RIS activities as well as investment plans and identified a number of technical issues which are considered key priorities in the context of the TEN-T programme. It further identified a number of legal and organi-sational issues, which would need to be addressed at a certain point in order to optimise the benefits of RIS and to ensure a co-ordinated, harmonised and synchronised implementation in the different countries involved.

Priority Projects concerning rail, road and inland waterways (PPs)The programme aims at channelling Union aid at supporting sections of priority projects (in the rail, road and inland waterway sectors) which promise the highest added value for the projects as a whole, i.e. cross-border sections, innovation actions and the removal of bottlenecks. This area addresses also ongoing Actions on PPs that applied for higher co-funding rates.

2 OJ L 255, 30.9.2005, p. 152–159

7

2. Key elements of proposals received under the 2012 Multi-Annual Call for Proposals

1. General Overview197 proposals were received in response to the 2012 Multi-annual Calls for proposals. 189 of these proposals were eligible and addressed the EU and transport priorities set out in the amended Multi-annual Work Programme 2012 as well as the Multi-annual Work Programme 2013.

2. Budgetary featuresThe total amount requested by applicants for the 2012 Multi-annual Calls in the eligible proposals was €5,727,775,792 while the total indicative budget for the call was €1,347 million for the six fields.

Table 1: Eligible proposals including the requested funding and indicative budget by priority

Priority Number of eligible proposals

Requested TEN-T funding (€ million)

Budget available (€ million)

ATM 9 107.48 50

ERTMS 27 250.73 100

ITS-EETS 12 206.62 50

MoS 22 212.65 80

RIS 4 3.43 10

PPs 115 4,946.82 1,057

TOTAL 189 5,727.77 1,347

As evidenced above, all fields were largely oversubscribed except for River Information Services (RIS).

3. The selection of proposalsThe selection process was carried out in three steps:

1. An external evaluation of proposals was organised by the TEN-T Executive Agency. The technical appraisal of each proposal against four blocks of award criteria (relevance, maturity, impact and quality) was made individually by at least three external experts. These experts then discussed each proposal and agreed on a consensus recom-mendation for or against funding and on a score for each of the four blocks of award criteria. This evaluation by external experts, which did not take into consideration the budgetary constraints, led to the recommendation of 134 proposals representing a total TEN-T requested funding of €5,249,827,671.30, which was 3.9 times more than the available budget (€1,347 million).

2. An appraisal in relation to the EU transport policy priorities and the objectives and restrictions set by the 2012 Multi-annual Call was undertaken internally, on the basis of the policy-related aspects mentioned in the ‘final se-lection process’ section of the call texts. An Internal Evaluation Panel, composed of representatives of DG MOVE, the TEN-T Executive Agency and DG ENV reviewed each proposal individually, to cut any costs and/or activities that would not be eligible or not recommended for funding. It also considered each proposal in view of the TEN-T objectives and priorities and its compliance with EU environmental law.

3. Finally, the Evaluation Committee composed of DG MOVE and TEN-T EA Directors confirmed the recommendation of the Internal Evaluation Panel.

Overall, the external and internal evaluation process resulted in recommending 89 proposals representing a total TEN-T funding of €1,348,385,369 (see Figure 1). Therefore, the indicative budget of €1,347 million will be entirely consumed together with unallocated amounts (€2,781,500) from the 2012 Annual call for proposals. Only proposals receiving a positive recommendation from the external evaluation were recommended for funding.

8

Figure 1: Overview of the evaluation process

The final results of the 2012 Multi-annual Calls including the repartition of the requested TEN-T funding per priority are detailed in Table 2 as well as in Figures 2 and 3.

Table 2: Proposals eligible/recommended for funding by field/priority area

Field Number of eligible proposals

Requested TEN-T funding (€ million)

Number of proposals recommended for

funding

Recommended TEN-T funding (€ million)

ATM 9 107.48 3 58.80

ERTMS 27 250.73 14 68.33

ITS-EETS 12 206.62 2 3.58

MOS 22 212.65 13 169.37

RIS 4 3.43 4 3.43

PPs - Total 115 4,946.82 53 1,044.84

PPs new actions 95 2,983.36 39 731.39

PPs ongoing actions 20 1,963.46 14 313.45

TOTAL 189 5,727.77 89 1,348.38

Proposals recommended for funding offer a wide coverage in all fields as described in the Work Programmes and the call texts. In terms of transport modes, there is a clear predominance of rail while Motorways of the Sea also received a high attention by applicants.

189

134

89

0

20

40

60

80

100

120

140

160

180

200

Eligible proposals Recommendedproposals

(External Evaluation)

Recommendedproposals

(Internal Evaluation)

5,727.8

4,311.2

1,348.4 1,347

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

RequestedTEN-T funding

(Eligibleproposals)

RecommendedTEN-T funding

(ExternalEvaluation)

RecommendedTEN-T funding

(InternalEvaluation)

Indicative budget

Number of proposals TEN-T funding ( million)

9

Figure 3. Recommended proposals and TEN-T funding per Priority Project

Figure 4. Recommended proposals and TEN-T funding per project type

Figure 2: Recommended proposals and TEN-T funding per field

TEN-T funding ( million)

( ) = Number of recommended proposals

111.3(4)

147.7(6)

9.9(1)

141.1(4)

5.7(1)

139.8(4)

22.1(2)

2.8(1)

90.2(5)

43.2(3)

73(2)

76.5(4)

1.6(2)

68.4(4)

51.6(5)

10(2)

38.8(2)

11.2(1)

0

20

40

60

80

100

120

140

160

PP01 PP03 PP04 PP06 PP08 PP12 PP13 PP16 PP17 PP18 PP19 PP20 PP22 PP24 PP26 PP27 PP28 PP30

Mill

ions

TEN-T funding ( million)

58.8(3)

68.3(14) 3.6

(2)

169.4(13)

3.4(4)

731.4(39)

313.5(14)

0

100

200

300

400

500

600

700

800

ATM ERTMS ITS-EETS MOS RIS PPS: Newaction

PPS: Ongoingaction

( ) = Number of recommended proposals

TEN-T funding ( million)

392.4(40)

956(49)

0

200

400

600

800

1,000

1,200

Study Work

( ) = Number of recommended proposals

10

4. TEN-T Funding – Map representations of the proposals recommended for funding

11

12

13

14

15

16

17

18 19

5. P

ropo

sals

rec

omm

ende

d un

der

the

2012

TEN

-T M

ulti

-Ann

ual C

all f

or P

ropo

sals

AT

M -

Air

Traffi

c M

anag

emen

t

ERTM

S -

Euro

pean

Rai

l Tra

ffic

Man

agem

ent

Syst

em

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-EU

-400

03-S

Activ

ities

to s

uppo

rt th

e im

plem

enta

-tio

n of

the

IDP

with

in D

ANU

BE F

ABSt

ate

Ente

rpris

e “B

ulga

rian

Air

Traffi

c Se

rvic

es A

utho

r-ity

” BU

LATS

A

EUSt

udy

2,78

8,42

01,

394,

210

50%

2,78

8,00

01,

394,

000

50%

2012

-EU

-400

04-P

ANSP

s In

terim

D

eplo

ymen

t Pr

o-gr

amm

e Im

plem

enta

tion

ENAV

S.p

.A.

EUW

ork

253,

778,

950.

5550

,755

,790

.11

20%

253,

775,

000

50,7

55,0

0020

%

2012

-EU

-400

06-S

Acce

lera

ting

the

Dep

loym

ent

of A

d-va

nced

FD

P Ca

pabi

litie

s in

Eur

ope

NAT

S (E

N R

OU

TE) P

LCEU

Stud

y13

,310

,512

.70

6,65

5,25

6.35

50%

13,3

10,0

006,

655,

000

50%

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-BE-

6002

7-P

Equi

pem

ent

of

ETCS

1 on

H

SL

L2,

upgr

ade

of H

SL L

3 an

d L4

to

ETCS

2 v2

.3.0

d, e

quip

men

t of

ETC

S1 v

2.3.

0d

on L

10 a

nd L

36C/

2

Infr

abel

nv

BEW

ork

23,9

54,5

8011

,977

,290

50%

23,8

54,0

0011

,927

,000

50%

2012

-DE-

6001

3-P

ETCS

eq

uipm

ent

of

DB

Sche

nker

Ra

il lo

com

otiv

es

for

inte

rope

rabl

e fr

eigh

t tr

affic

in A

ustr

ia (T

EN-T

Prio

r-ity

Pro

ject

17

and

ERTM

S Co

rrid

or B

)

DB

Sche

nker

Rai

l AG

DE

Wor

k3,

750,

000

1,87

5,00

050

%2,

250,

000

1,12

5,00

050

%

2012

-DE-

6001

4-P

ETCS

equ

ipm

ent

of D

B Sc

henk

er R

ail

loco

mot

ives

for

inte

rope

rabl

e fr

eigh

t tr

affic

on E

RTM

S Co

rrid

or A

DB

Sche

nker

Rai

l AG

DE

Wor

k8,

850,

000

4,42

5,00

050

%8,

850,

000

4,42

5,00

050

%

2012

-DE-

6002

5-P

Upg

rade

, pro

toty

ping

, ret

rofit

ting

and

test

ing

LOKO

MO

TIO

N lo

com

otiv

es t

o ET

CS 2

.3.0

d / B

asel

ine

3

Loko

mot

ion

Ges

ells

chaf

t fü

r Sc

hien

entr

aktio

n m

bHD

EW

ork

9,09

0,00

01,

800,

000

19.8

0%9,

090,

000

1,80

0,00

019

.80%

2012

-DK-

6000

2-P

Early

dep

loym

ent

of E

RTM

S Ba

selin

e 3

in D

enm

ark

Bane

danm

ark

(Rai

l N

et

Den

mar

k)D

KW

ork

117,

967,

095

58,9

83,5

4750

%40

,000

,000

20,0

00,0

0050

%

2012

-EU

-600

20-P

Dep

loym

ent

of

ERTM

S O

n Bo

ard-

equi

omen

t in

Sw

eden

201

2-20

15Tr

afikv

erke

tEU

Wor

k90

,090

,000

30,3

25,0

0033

.66%

24,3

50,0

008,

198,

000

33.6

7%

2012

-EU

-600

22-S

Faci

litat

ing

and

spee

ding

up

ERTM

S -

2nd

phas

eEE

IG E

RTM

S U

sers

Gro

upEU

Stud

y15

,083

,000

7,54

1,50

050

%6,

346,

000

3,17

3,00

050

%

2012

-EU

-600

33-P

CEE

goes

ECT

SCa

rgoS

erv

Gm

bhEU

Wor

k5,

303,

069

1,65

9,57

031

.29%

5,30

3,00

01,

659,

000

31.2

8%

18 19

2012

-IT-

6000

9-P

Off

-site

and

fiel

d te

stin

g to

sup

port

Ita

lian

ERTM

S m

igra

tion

stra

tegy

MIN

ISTE

RO

DEL

LE

IN-

FRAS

TRU

TTU

RE

E D

EI

TRAS

PORT

I

ITW

ork

6,00

0,00

03,

000,

000

50%

4,82

2,00

02,

411,

000

50%

2012

-IT-

6001

2-P

Equi

pmen

t of

ET

R 10

00

trai

nset

s w

ith E

TCS

Base

line

2 re

leas

e 2.

3.0d

Tren

italia

SpA

ITW

ork

5,35

5,00

02,

677,

500

50%

2,85

8,00

01,

429,

000

50%

2012

-IT-

6001

8-P

Upg

rade

of

Rom

a-N

apol

i hig

h sp

eed

line

in o

rder

to

ensu

re c

ompa

tibili

ty

with

ERT

MS

base

line

2.3.

0d

MIN

ISTE

RO

DEL

LE

IN-

FRAS

TRU

TTU

RE

E D

EI

TRAS

PORT

I

ITW

ork

6,00

0,00

03,

000,

000

50%

6,00

0,00

03,

000,

000

50%

2012

-NL-

6000

5-P

Maa

svla

kte

2 ER

TMS

Port

of

Rott

erda

mN

LW

ork

11,0

89,8

395,

544,

919

50%

1,80

0,00

090

0,00

050

%

2012

-NL-

6000

6-P

An E

TCS

base

line

230d

and

3.0

pro

-gr

am f

or i

nsta

llatio

n, u

pgra

de a

nd

prot

otyp

ing

of v

ario

us t

ypes

ele

ctri-

cal f

reig

ht lo

com

otiv

es f

or u

sage

on

mul

tiple

TEN

-T f

reig

ht c

orrid

ors

and

conv

entio

nal n

etw

orks

Mits

ui R

ail

Capi

tal

Euro

pe

B.V.

NL

Wor

k44

,117

,872

19,9

58,9

3645

.24%

2,00

0,00

01,

000,

000

50%

2012

-SE-

6002

8-S

Upg

rade

to

an u

nifo

rm s

wed

ish

sys-

tem

req

uire

men

t fo

r ER

TMS,

Lev

el2

Trafi

kver

ket

SESt

udy

14,5

81,7

557,

290,

876

50%

14,5

80,0

007,

290,

000

50%

ITS/

EETS

- In

telli

gent

Tra

nspo

rt S

yste

ms/

Euro

pean

Ele

ctro

nic

Toll

Serv

ice

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-EU

-500

05-S

Euro

pean

ITS

Plat

form

(EIP

)M

inis

tero

del

le I

nfra

stru

t-tu

re e

dei

Tra

spor

ti -

Di-

rezi

one

gene

rale

pe

r lo

sv

ilupp

o de

l te

rrito

rio,

la

prog

ram

maz

ione

e i

pro

-ge

tti i

nter

nazi

onal

i

EUSt

udy

11,9

19,9

505,

959,

975

50%

2,70

0,00

01,

350,

000

50%

2012

-EU

-500

09-S

Regi

onal

Eu

rope

an

Elec

tron

ic

Toll

Serv

ice

(REE

TS T

EN)

Auto

bahn

en-

und

Schn

ell-

stra

ßen-

Fina

nzie

rung

s-Ak

-tie

nges

ells

chaf

t (A

SFIN

AG)

EUSt

udy

5,24

4,60

52,

622,

302.

5050

%4,

470,

000

2,23

5,00

050

%

20 21

MoS

- M

otor

way

s of

the

Sea

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-EU

-210

03-P

LNG

Rot

terd

am G

othe

nbur

gLN

G B

reak

Bul

k Ro

tter

dam

CV

EUW

ork

184,

008,

970

36,8

01,7

9420

%17

1,36

4,00

034

,272

,000

20%

2012

-EU

-210

06-S

SEAG

ASB.

A.I.B

RETA

GN

E AN

GL-

ETER

RE IR

LAN

DE

SA (

BRIT

-TA

NY

FERR

IES)

EUSt

udy

2,08

2,64

41,

225,

321

58.8

3%2,

082,

000

1,04

1,00

050

%

2012

-EU

-210

07-S

MO

NAL

ISA

2.0

Swed

ish

Mar

itim

e Ad

min

-is

trat

ion

EUSt

udy

24,3

16,0

9612

,158

,048

50%

24,3

16,0

0012

,158

,000

50%

2012

-EU

-210

08-S

Win

ter

Nav

igat

ion

Mot

orw

ays

of t

he

Sea,

WIN

MO

SSw

edis

h M

ariti

me

Adm

in-

istr

atio

nEU

Mix

142,

330,

507

29,6

77,7

7020

.85%

142,

330,

000

29,6

77,0

0020

.85%

2012

-EU

-210

09-P

Pilo

t: LN

G B

unke

ring

Infr

astr

uctu

re

Solu

tion

and

Pilo

t ac

tions

for

Shi

ps

oper

atin

g on

the

Mot

orw

ay o

f th

e Ba

ltic

Sea

SSPA

Sw

eden

AB

EUM

ix76

,059

,772

23,1

03,3

8730

.38%

76,0

59,0

0023

,103

,000

30.3

8%

2012

-EU

-210

10-S

PILO

T SC

RUBB

ER –

New

Gen

erat

ion

Ligh

twei

ght

Pilo

t Sc

rubb

er S

olut

ion

inst

alle

d on

a R

o-Ro

Shi

p op

erat

ing

on t

he M

otor

way

of

the

Balti

c Se

a

SSPA

Sw

eden

AB

EUSt

udy

13,5

83,6

506,

791,

824

50%

13,5

83,0

006,

791,

000

50%

2012

-EU

-210

11-P

TWIN

-PO

RTPo

rt o

f H

elsi

nki

EUW

ork

56,3

00,0

0011

,260

,000

20%

56,3

00,0

0011

,260

,000

20%

2012

-EU

-210

13-S

Kvar

ken

Mul

timod

al L

ink

- M

idw

ay

Alig

nmen

t of

the

Bot

hnia

n Co

rrid

orN

LC F

erry

Ab

Oy

EUM

ix23

,609

,015

8,50

6,76

836

.03%

20,7

34,0

006,

129,

000

29.5

6%

2012

-EU

-210

17-S

Met

hano

l: Th

e m

arin

e fu

el o

f th

e fu

-tu

reSt

ena

Aktie

bola

gEU

Stud

y22

,502

,000

11,2

51,0

0050

%22

,502

,000

11,2

51,0

0050

%

2012

-EU

-210

19-S

ANN

A -

Adva

nced

Nat

iona

l Net

wor

ks

for

Adm

inis

trat

ions

Min

istr

y of

In

fras

truc

-tu

re a

nd t

he E

nviro

nmen

t (K

ingd

om o

f Th

e N

ethe

r-la

nds)

EUSt

udy

37,0

76,4

3718

,538

,219

50%

37,0

76,0

0018

,538

,000

50%

2012

-EU

-210

20-S

Busi

ness

to

Mot

orw

ays

of t

he S

eaFU

ND

ACIO

N D

E LA

CO

MU

-N

IDAD

VAL

ENCI

ANA

PARA

LA

IN

VEST

IGAC

ION

, PR

O-

MO

CIO

N

Y ES

TUD

IOS

COM

ERCI

ALES

DE

VALE

N-

CIAP

ORT

EUSt

udy

11,3

94,9

705,

697,

485

50%

11,3

94,0

005,

697,

000

50%

2012

-EU

-210

21-S

Wid

erM

oSAu

torit

à Po

rtua

le

della

Sp

ezia

EUSt

udy

5,94

0,39

8.00

2,97

0,19

950

%5,

940,

000

2,97

0,00

050

%

2012

-EU

-210

23-S

Sust

aina

ble

Traffi

c M

achi

nes

- O

n th

e w

ay t

o gr

eene

r sh

ippi

ngSc

andl

ines

D

euts

chla

nd

Gm

bHEU

Stud

y25

,303

,950

.00

12,6

51,9

7550

%12

,917

,000

6,45

8,00

050

%

20 21

PPs

- Pr

iorit

y Pr

ojec

ts (N

ew A

ctio

ns)

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-AT-

1700

2-P

Prio

ritär

e TE

N-H

aupt

achs

e N

o.

17,

Öst

erre

ichi

sche

r Te

ilabs

chni

tt

“Mün

chen

Salz

burg

, Sa

lzbu

rg

– W

ien

und

Wie

n –

Brat

isla

va”;

Bau

der

Güt

erzu

gum

fahr

ung

St.

Pölte

n im

Wes

tabs

chni

tt (

shor

t tit

le: F

reig

ht

trai

n by

pass

St.

Pölte

n, c

onne

ctio

n to

th

e W

est)

Bund

esm

inis

teriu

m

für

Verk

ehr,

Inno

vatio

n un

d Te

chno

logi

e

ATW

ork

66,3

91,3

6013

,278

,272

20%

66,3

85,0

0013

,277

,000

20%

2012

-AT-

1700

3-P

Prio

ritär

e TE

N-H

aupt

achs

e N

o.

17,

Öst

erre

ichi

sche

r Te

ilabs

chni

tt

“Mün

chen

Salz

burg

, Sa

lzbu

rg

– W

ien

und

Wie

n –

Brat

isla

va”;

Lück

-en

schl

uss

St.

Pölte

n –

Loos

dorf

(G

üter

zugu

mfa

hrun

g),

Bau

des

Pum

mer

sdor

fer

Tunn

els

(sho

rt t

itle:

“P

umm

ersd

orfe

r Tu

nnel

”)

Bund

esm

inis

teriu

m

für

Verk

ehr,

Inno

vatio

n un

d Te

chno

logi

e

ATW

ork

66,9

82,0

0013

,396

,400

20%

66,9

75,0

0013

,395

,000

20%

2012

-AT-

1807

0-P

Expa

nsio

n of

th

e tr

i-m

odal

in

land

po

rt b

y la

nd r

ecov

ery

Wie

ner

Haf

en, G

mbh

& C

o KG

ATW

ork

12,7

97,4

772,

559,

495.

4020

%12

,790

,000

2,55

8,00

020

%

2012

-BE-

2810

5-P

Wat

erm

ael S

chum

an-J

osap

hat

Infr

abel

sa

BEW

ork

194,

471,

239.

1838

,894

,247

.84

20%

169,

720,

000

33,9

44,0

0020

%

2012

-CZ-

2211

7-P

INTE

RMO

DAL

TER

MIN

AL M

ELN

IKČe

ské

přís

tavy

, a.s

.CZ

Wor

k4,

134,

648

826,

929.

6020

%4,

130,

000

826,

000

20%

RIS

- Ri

ver

Info

rmat

ion

Serv

ices

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-BE-

7000

1-P

Impl

emen

tatio

n of

RIS

in F

land

ers

IVFl

emis

h G

over

nmen

tBE

Wor

k2,

940,

000

588,

000

20%

2,94

0,00

058

8,00

020

%

2012

-EU

-700

02-P

Impl

emen

tatio

n of

RIS

on

the

Wes

t-er

sche

ldt

Rive

r III

Flem

ish

Gov

ernm

ent

EUW

ork

2,37

5,00

047

5,00

020

%2,

375,

000

475,

000

20%

2012

-EU

-700

04-S

RIS

Enab

led

Euro

pean

IW

T Co

rrid

or

Man

agem

ent

Staa

t de

r N

eder

land

en,

Min

iste

rie

van

Infr

astr

uc-

tuur

en

Mili

eu

EUSt

udy

2,81

4,00

01,

407,

000

50%

2,81

4,00

01,

407,

000

50%

2012

-FR-

7000

3-S

RIS

Upp

er R

hine

Min

istè

re d

e l'é

colo

gie,

du

Dév

elop

pem

ent

dura

ble

et

de l'

éner

gie

FRSt

udy

1,93

6,20

096

8,10

050

%1,

936,

000

968,

000

50%

22 23

2012

-DE-

1702

2-S

Plan

ning

the

con

stru

ctio

n of

a n

ew

railw

ay c

onne

ctio

n be

twee

n M

unic

h Ai

rpor

t an

d th

e Eu

rope

an

railw

ay

corr

idor

TEN

PP

17 b

etw

een

Mun

ich

and

Salz

burg

Baye

risch

es

Staa

tsm

in-

iste

rium

r W

irtsc

haft

, In

fras

truk

tur,

Verk

ehr

und

Tech

nolo

gie

DE

Stud

y25

,000

,000

12,5

00,0

0050

%25

,000

,000

12,5

00,0

0050

%

2012

-DE-

2001

2-S

Plan

ungs

leis

tung

en z

ur E

ntfle

chtu

ng

der

schi

enen

gebu

nden

en

Verk

ehre

bz

gl.

der

Fehm

arnb

elt-

Hin

terla

n-da

nbin

dung

an

dem

Ver

kehr

skno

ten

Ham

burg

(TEN

-V-A

chse

20)

Frei

e un

d H

anse

stad

t H

ambu

rg,

Behö

rde

für

Wirt

scha

ft, V

erke

hr u

nd In

-no

vatio

n

DE

Stud

y29

,200

,000

14,6

00,0

0050

%29

,200

,000

14,6

00,0

0050

%

2012

-DK-

2001

0-S

New

rai

lway

lin

e be

twee

n Co

penh

a-ge

n an

d Ri

ngst

ed (

deta

iled

plan

ning

ph

ase)

-acc

ess

lines

to

the

futu

re F

e-hm

arn

Belt

fixed

link

Bane

danm

ark

(Rai

l N

et

Den

mar

k)D

KSt

udy

61,1

68,0

0030

,584

,000

50%

61,1

68,0

0030

,584

,000

50%

2012

-DK-

2001

3-S

Upg

radi

ng t

he s

ectio

n fr

om R

ings

ted

to R

ødby

(se

cond

pha

se o

f de

taile

d pl

anni

ng

stud

ies)

-

upgr

adin

g th

e ra

ilway

acc

ess

lines

to th

e fu

ture

Fe-

hmar

n Be

lt fix

ed li

nk

Bane

danm

ark

(Rai

l N

et

Den

mar

k)D

KSt

udy

39,4

41,5

8619

,720

,793

50%

39,4

40,0

0019

,720

,000

50%

2012

-EE-

2700

1-S

Spat

ial P

lann

ing

and

Tech

nica

l Stu

d-ie

s fo

r Ra

il Ba

ltic

(Est

onia

n se

ctio

n)Es

toni

an T

echn

ical

Sur

veil-

lanc

e Au

thor

ityEE

Stud

y10

,257

,400

5,12

8,70

050

%10

,256

,000

5,12

8,00

050

%

2012

-EL-

2202

3-S

Υπολ

ειπό

μενε

ς με

λέτε

ς γι

α τη

ν υπ

ογει

οποι

ήση

και

ανισ

οπεδ

οποι

ήση

του

σιδη

ροδρ

ομικ

ού

διαδ

ρόμο

υ απ

ό τη

ν έξ

οδο

του

Σ.Σ

Πει

ραιά

(Χ.

Θ.

1+48

8)

έω

ς τη

ν εί

σοδο

το

υ Σ.

Σ Αθ

ηνώ

ν (X

.Θ. 9

+700

)

ΥΠΟ

ΥΡΓΕ

ΙΟ

ΑΝΑΠ

ΤΥΞΗ

Σ,

ΑΝ

ΤΑΓΩ

ΝΙΣ

ΤΙΚ

ΟΤΗ

ΤΑΣ,

ΥΠ

ΟΔΟ

ΜΩ

Ν,

ΜΕΤ

ΑΦΟ

ΡΩΝ

&

ΔΙΚ

ΤΥΩ

Ν

ELSt

udy

1,50

0,00

075

0,00

050

%1,

500,

000

750,

000

50%

2012

-ES-

0304

0-S

NU

EVO

ACC

ESO

SU

R VI

ARIO

Y F

ER-

ROVI

ARIO

AL

PUER

TO D

E BA

RCEL

O-

NA.

FAS

E 1.

EST

UD

IOS

Min

iste

rio

de

Fom

ento

. D

irecc

ión

Gen

eral

de

Fer-

roca

rrile

s.

ESSt

udy

1,58

0,40

079

0,20

050

%1,

580,

000

790,

000

50%

2012

-ES-

0811

3-P

Elec

tric

al

Faci

litie

s in

Se

ctio

n M

e-di

na d

el C

ampo

-Sal

aman

ca. R

ailw

ay

line

Med

ina

del

Cam

po-S

alam

anca

-Fu

ente

s de

Oño

rio

ADM

INIS

TRAD

OR

DE

IN-

FRAE

STRU

CTU

RAS

FERR

O-

VIAR

IAS

ESW

ork

28,3

70,0

005,

674,

000

20%

28,3

70,0

005,

674,

000

20%

2012

-ES-

1609

6-P

Trac

k be

d w

orks

, Si

gnal

ing

and

Tel-

ecom

unic

atio

n Fa

cilit

ies.

Sec

tion

Pk

3,1

a P

k 6,

8. S

an R

oque

Mer

canc

ías.

Ra

ilway

Lin

e Bo

badi

lla-A

lgec

iras

ADM

INIS

TRAD

OR

DE

IN-

FRAE

STRU

CTU

RAS

FERR

O-

VIAR

IAS

ESW

ork

14,0

00,0

002,

800,

000

20%

14,0

00,0

002,

800,

000

20%

2012

-ES-

1903

1-S

IMPL

ANTA

CIÓ

N D

EL A

NCH

O U

IC E

N

EL C

ORR

EDO

R M

EDIT

ERRÁ

NEO

. FAS

E 1.

EST

UD

IOS.

Min

iste

rio

de

Fom

ento

. D

irecc

ión

Gen

eral

de

Fer-

roca

rrile

s.

ESSt

udy

9,75

4,90

04,

877,

450

50%

9,75

4,00

04,

877,

000

50%

2012

-ES-

1904

1-P

IMPL

ANTA

CIÓ

N

DEL

AN

CHO

U

IC

EN

EL

CORR

EDO

R M

EDIT

ERRÁ

NEO

. TR

AMO

: CA

STEL

LBIS

BAL-

NU

DO

DE

VILA

SECA

. FAS

E 1.

ADM

INIS

TRAD

OR

DE

IN-

FRAE

STRU

CTU

RAS

FERR

O-

VIAR

IAS

ESW

ork

340,

859,

700

68,1

71,9

4020

%34

0,85

5,00

068

,171

,000

20%

22 23

2012

-EU

-010

92-S

Prio

rity

TEN

-axi

s N

o. 1

, Glo

bal P

roje

ct

“Mun

ich–

Kufs

tein

, Ku

fste

in–I

nns-

bruc

k, B

renn

er B

ase

Tunn

el (

cros

s-bo

rder

) an

d Fo

rtez

za–V

eron

a”;

Pre-

stud

y fo

r th

e N

orth

ern

Acce

ss L

ine

to t

he B

renn

er B

ase

Tunn

el b

etw

een

Mun

ich

(Ger

man

y) a

nd R

adfe

ld (A

us-

tria

)

Bund

esm

inis

teriu

m

für

Verk

ehr,

Inno

vatio

n un

d Te

chno

logi

e

EUSt

udy

6,71

5,00

03,

357,

500

50%

6,71

4,00

03,

357,

000

50%

2012

-EU

-010

98-S

PRIO

RITY

PRO

JECT

TEN

NO

. 1 B

REN

-N

ER B

ASE

TUN

NEL

- S

TUD

IES

MIN

ISTE

RO

DEL

LE

IN-

FRAS

TRU

TTU

RE

E D

EI

TRAS

PORT

I

EUSt

udy

171,

300,

000

85,6

50,0

0050

%17

1,30

0,00

085

,650

,000

50%

2012

-EU

-130

66-S

Acce

lera

ting

the

intr

oduc

tion

of E

lec-

tric

Veh

icle

Rap

id C

harg

ing

by s

tudy

-in

g ad

optio

n an

d us

e al

ong

PP a

xes

13 a

nd 2

6 in

the

UK

and

Irela

nd

Nis

san

Mot

or (G

B) L

tdEU

Stud

y7,

359,

778

3,67

9,88

850

%7,

358,

000.

003,

679,

000

50%

2012

-EU

-180

67-S

LNG

M

aste

rpla

n fo

r Rh

ine-

Mai

n-D

anub

ePr

o D

anub

e M

anag

emen

t G

mbH

EUSt

udy

121,

316,

983.

4460

,658

,491

.72

50%

80,5

20,0

0040

,260

,000

50%

2012

-EU

-180

89-S

Hig

h-pe

rfor

man

ce

GRE

EN

PORT

G

IURG

IUIL

R Lo

gist

ica

Rom

ania

S.

R.L.

EUSt

udy

16,8

72,5

008,

436,

250

50%

800,

000

400,

000

50%

2012

-FR-

0305

4-S

Gra

nd P

roje

t du

Sud

Oue

st -

Bor

-de

aux

Espa

gne

Min

istè

re d

e l'é

colo

gie,

du

déve

lopp

emen

t du

rabl

e, e

t de

l’én

ergi

e

FRSt

udy

11,3

00,0

005,

650,

000

50%

11,3

00,0

005,

650,

000

50%

2012

-FR-

2405

3-S

Prem

ière

éta

pe d

e dé

satu

ratio

n du

N

oeud

fer

rovi

aire

de

Lyon

Min

istè

re d

e l'é

colo

gie,

du

déve

lopp

emen

t du

rabl

e, e

t de

l’én

ergi

e

FRSt

udy

19,3

00,0

009,

650,

000

50%

19,3

00,0

009,

650,

000

50%

2012

-IE-

2604

3-S

City

Ce

ntre

Re

-sig

nalli

ng

Proj

ect

- Co

nnol

ly S

tatio

n to

San

dym

ount

Sta

-tio

n -

Des

ign

Stag

e

Dep

artm

ent

of

Tran

spor

t, To

uris

m a

nd S

port

IESt

udy

1,44

9,00

072

4,50

050

%1,

448,

000

724,

000

50%

2012

-IT-

0607

2-P

Trat

ta A

V/AC

Tre

vigl

io -

Bre

scia

: com

-pl

etam

ento

lott

o co

stru

ttiv

o tr

atta

e

real

izza

zion

e op

ere

di s

iste

maz

ione

st

azio

ne d

i Bre

scia

.

Min

iste

ro d

elle

Inf

rast

rut-

ture

e d

ei T

rasp

orti

ITW

ork

729,

051,

796

145,

810,

359

20%

657,

650,

000

131,

530,

000

20%

2012

-IT-

2407

1-P

MXP

T2(R

ailin

k)-U

PRa

ilink

S.r.

l.IT

Wor

k11

5,00

0,00

023

,000

,000

20%

115,

000,

000

23,0

00,0

0020

%

2012

-IT-

2411

6-P

CIM

WES

T TE

RMIN

AL E

XPAN

SIO

NC.

I.M. S

.p.A

.IT

Wor

k10

,000

,000

2,00

0,00

020

%10

,000

,000

2,00

0,00

020

%

2012

-LU

-280

25-S

Luxe

mbo

urg

rail

netw

ork.

Eur

oCap

-Ra

il. S

tudi

es r

egar

ding

the

con

stru

c-tio

n of

a n

ew s

ectio

n pr

ovid

ing

a di

rect

link

bet

wee

n Lu

xem

bour

g St

a-tio

n an

d Be

ttem

bour

g an

d th

e up

-gr

adin

g of

Bet

tem

bour

g St

atio

n.

Min

istè

re

du

Dév

elop

pe-

men

t du

rabl

e et

des

Infr

a-st

ruct

ures

LUSt

udy

9,62

5,82

54,

812,

911

50%

9,62

4,00

04,

812,

000

50%

2012

-LV-

2712

0-S

Prel

imin

ary

desi

gn

and

oper

atio

ns

stud

ies

for

Rail

Balti

ca r

ailw

ay l

ine

Latv

ian

sect

ion

Min

istr

y of

Tra

nspo

rt o

f the

Re

publ

ic o

f La

tvia

LVSt

udy

9,84

0,00

04,

920,

000

50%

9,84

0,00

04,

920,

000

50%

2012

-SE-

1203

3-S

Des

ign

stud

ies

for

expa

nsio

n to

fou

r tr

acks

of

Nor

dic

Tria

ngle

at F

lack

arp-

Arlö

v in

Sw

eden

Swed

ish

Tran

spor

t Ad

min

-is

trat

ion

SESt

udy

19,0

86,6

789,

543,

339

50%

19,0

86,0

009,

543,

000

50%

24 25

2012

-SE-

1204

8-P

Com

plet

ion

of

the

railw

ay

tun-

nel

thro

ugh

Hal

land

sås

– a

prio

rity

proj

ect

in t

he N

ordi

c Tr

iang

le

Swed

ish

Tran

spor

t Ad

min

-is

trat

ion

SEW

ork

396,

808,

200

79,3

61,6

4020

%39

6,80

8,00

079

,361

,000

20%

2012

-SE-

1206

9-P

The

Got

henb

urg

Port

Lin

e -

railw

ay

brid

ge a

t M

arie

holm

Swed

ish

Tran

spor

t Ad

min

-is

trat

ion

SEW

ork

120,

447,

648

24,0

89,5

3020

%12

0,44

5,00

024

,089

,000

20%

2012

-SI-

0608

3-S

Izde

lava

pro

jekt

a za

prid

obite

v gr

ad-

bene

ga d

ovol

jenj

a (P

GD

) in

pro

jekt

a za

izve

dbo

(PZI

) za

ure

dite

v vo

zliš

ča

z ur

editv

ijo ž

elez

nišk

e po

staj

e Pr

ag-

ersk

o

Min

istr

stvo

za

in

fras

truk

-tu

ro

in

pros

tor

Repu

blik

e Sl

oven

ije

SISt

udy

4,28

0,00

02,

140,

000

50%

4,28

0,00

02,

140,

000

50%

2012

-SI-

0608

6-S

Exec

utio

n de

sign

for

upg

radi

ng t

he

exis

ting

mai

n do

uble

-tra

ck e

lect

rified

Zi

dani

Mos

t-Ce

lje r

ailw

ay li

ne

Min

istr

y of

In

fras

truc

ture

an

d Sp

atia

l Pla

nnin

gSI

Stud

y3,

500,

000

1,75

0,00

050

%3,

500,

000

1,75

0,00

050

%

2012

-UK-

1301

8-P

A8 B

elfa

st t

o La

rne

Dua

lling

(Fr

om

Cole

man

’s

Corn

er

to

Bally

ricka

rd

Road

)

Dep

artm

ent

for

Tran

spor

tU

KW

ork

112,

520,

387.

7622

,504

,077

.56

20%

91,8

60,0

0018

,372

,000

20%

2012

-UK-

2603

0-P

Felix

stow

e ra

il te

rmin

al (

phas

e 2)

-

Furh

er

impr

ovin

g in

emod

al

tras

fer

and

rem

ovin

g bo

ttle

neck

on

PP26

Dep

artm

ent

for

Tran

spor

tU

KW

ork

13,2

27,0

002,

645,

400

20%

8,62

0,00

01,

724,

000

20%

2012

-UK-

2605

8-P

Com

plet

ing

PP26

Sou

th (

Felix

stow

e to

Nun

eato

n) a

nd D

eliv

erin

g th

e TE

N-

T Co

re R

ail

Net

wor

k in

the

Uni

ted

King

dom

: Ips

wic

h Ch

ord

Dep

artm

ent

for

Tran

spor

tU

KW

ork

62,0

78,5

83.4

112

,415

,716

.68

20%

62,0

75,0

0012

,415

,000

20%

2012

-UK-

2606

0-P

Com

plet

ing

Prio

rity

Axis

26

(PP

26)

Nor

th a

nd d

eliv

erin

g th

e TE

N-T

Cor

e Ra

il N

etw

ork

in t

he U

nite

d Ki

ngdo

m:

Tran

spen

nine

Rai

l Ele

ctrifi

catio

n

Dep

artm

ent

for

Tran

spor

tU

KW

ork

155,

159,

806.

7131

,031

,961

.34

20%

155,

155,

000

31,0

31,0

0020

%

2012

-UK-

2606

1-S

Stud

y to

test

the

pote

ntia

l of B

io-L

NG

to

con

trib

ute

to E

urop

ean

rene

wab

le

ener

gy t

arge

ts b

ased

on

a pi

lot

re-

fuel

ling

and

stor

age

netw

ork

tria

lled

with

HG

V fle

et o

pera

tors

in t

he U

K.

Gas

rec

Ltd

UK

Stud

y16

,411

,000

5,77

4,00

035

.18%

16,4

08,5

725,

743,

000

35%

PPs

- Pr

iorit

y Pr

ojec

ts (O

ngoi

ng A

ctio

ns)

Prop

osal

Num

ber

Titl

e(C

oord

inat

ing)

Ap

plic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

fu

ndin

gRe

com

men

ded

tota

l elig

ible

co

sts

Reco

mm

ende

d TE

N-T

fu

ndin

g €

% T

EN-T

fu

ndin

g

2012

-DE-

0405

7-P

POS

Nor

dBu

ndes

min

iste

rium

r Ve

rkeh

r, Ba

u un

d St

adte

n-tw

ickl

ung

DE

Wor

k74

,200

,114

9,91

3,13

513

.36%

73,7

50,4

13.7

09,

882,

556

13.4

0%

2012

-DE-

1704

6-P

Neu

baus

trec

ke W

endl

inge

n -

Ulm

Bund

esm

inis

teriu

m

für

Verk

ehr,

Bau

und

Stad

ten-

twic

klun

g

DE

Wor

k62

5,74

1,44

935

,354

,392

5.65

%53

7,89

5,74

830

,383

,615

5.65

%

24 25

2012

-DE-

1705

0-P

Aus-

und

Neu

baus

trec

ke S

tutt

gart

-

Wen

dlin

gen

eins

chlie

ßlic

h St

uttg

art

21

Bund

esm

inis

teriu

m

für

Verk

ehr,

Bau

und

Stad

ten-

twic

klun

g

DE

Wor

k75

6,68

8,12

963

,507

,480

8.39

%75

6,68

8,12

920

,616

,775

2.73

%

2012

-DE-

2403

7-P

Ausb

aust

reck

e/N

euba

ustr

ecke

Ka

rl-sr

uhe

Base

l m

it te

ilwei

sen

Ausb

au-

maß

nahm

en

an

der

best

ehen

den

Stre

cke

Bund

esm

inis

teriu

m

für

Verk

ehr,

Bau

und

Stad

ten-

twic

klun

g

DE

Wor

k33

8,91

3,00

034

,874

,148

10.2

9%32

7,71

4,56

533

,721

,829

10.2

9%

2012

-ES-

0309

3-P

Cons

truc

ción

de

la N

ueva

Red

Fer

ro-

viar

ia e

n el

Pai

s Va

sco

( Y fe

rrov

iaria

) . T

ram

o gu

ipuz

coan

o

Gob

iern

o Va

sco.

Dep

arta

-m

ento

de

Med

io A

mbi

ente

y

Polit

ica

Terr

itoria

l

ESW

ork

1,08

7,89

9,22

332

6,36

9,76

730

%39

,556

,579

5,93

3,48

715

%

2012

-EU

-010

99-P

PRIO

RITY

PRO

JECT

TEN

NO

. 1 B

REN

-N

ER B

ASE

TUN

NEL

- W

ORK

SM

INIS

TERO

D

ELLE

IN

-FR

ASTR

UTT

URE

E

DEI

TR

ASPO

RTI

EUW

ork

558,

900,

000

167,

670,

000

30%

558,

900,

000

16,7

67,0

003%

2012

-EU

-031

15-P

Wor

ks f

or t

he H

igh-

Spee

d Ra

ilway

Ax

is o

f So

uth-

Wes

t Eu

rope

(PP

3) -

Li

sbon

-Mad

rid

Axis

: Cr

oss-

Bord

er

Sect

ion

Évor

a-M

érid

a

DIR

ECCI

ÓN

G

ENER

AL

DE

FERR

OCA

RRIL

ESEU

Wor

k17

4,62

5,85

652

,387

,757

30%

174,

625,

856

8,73

1,29

35%

2012

-EU

-060

49-P

Dem

ande

de

fin

ance

men

t su

pplé

-m

enta

ire 2

012-

2015

pou

r le

s ac

qui-

sitio

ns f

onci

ères

de

la s

ectio

n tr

ans-

fron

taliè

re d

u Ly

on-T

urin

Min

istè

re d

e l'E

colo

gie,

du

Dév

elop

pem

ent

Dur

able

et

de l'

Ener

gie

EUW

ork

684,

316,

207

300,

032,

600

43.8

4%18

9,69

7,50

95,

690,

925

3%

2012

-EU

-200

24-P

Fehm

arnb

elt

fixed

rai

l/roa

d lin

kM

inis

try

of T

rans

port

EUW

ork

289,

253,

100

106,

534,

550

36.8

3%19

0,46

0,00

011

,637

,106

6.11

%

2012

-EU

-300

81-P

Appl

icat

ion

mod

ifian

t la

cisi

on

C(20

08)8

141

du 1

5 dé

cem

bre

2008

co

ncer

nant

l'oc

troi

d'u

n co

ncou

rs fi

n-an

cier

en

fave

ur d

e pr

ojet

s d'

inté

rêt

com

mun

«Li

aiso

n flu

vial

e Se

ine-

Es-

caut

– t

ronç

on t

rans

fron

talie

r en

tre

Com

pièg

ne

et

Gan

- 20

07-E

U-

3001

0-P

Min

istè

re d

e l'é

colo

gie,

du

déve

lopp

emen

t du

rabl

e et

de

l'én

ergi

e

EUW

ork

1,01

6,15

1,00

135

4,73

5,00

034

.91%

37,3

00,0

0011

,190

,000

30%

2012

-FI-

1208

7-P

Airp

ort

railw

ay li

ne (R

ING

-lin

e)Th

e M

inis

try

of T

rans

port

an

d Co

mm

unic

atio

nsFI

Wor

k29

0,42

6,10

158

,085

,220

20%

178,

585,

651

26,7

87,8

4715

%

2012

-FR-

0305

6-P

Cont

ourn

emen

t N

imes

Mon

tpel

lier

Min

istè

re d

e l'é

colo

gie,

du

déve

lopp

emen

t du

rabl

e, e

t de

l’én

ergi

e

FRW

ork

1,13

3,89

6,58

922

6,77

9,31

720

%69

6,53

2,73

710

4,47

9,91

015

%

2012

-FR-

0305

9-P

Dés

atur

atio

n du

noe

ud f

erro

viai

re d

e Bo

rdea

uxM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppem

ent

dura

ble,

et

de l’

éner

gie

FRW

ork

147,

324,

509

29,4

64,9

0220

%14

7,32

4,50

922

,098

,676

15%

2012

-IT-

0107

9-P

Line

a di

acc

esso

mer

idio

nale

al B

ren-

nero

Min

iste

ro d

elle

Inf

rast

rut-

ture

e d

ei T

rasp

orti

ITW

ork

36,8

90,3

407,

378,

068

20%

36,8

90,3

405,

533,

551

15%

26 27

6. P

ropo

sals

NO

T re

com

men

ded

unde

r th

e 20

12 T

EN-T

Mul

ti-A

nnua

l Cal

l for

Pro

posa

ls

ATM

- A

ir Tr

affic

Man

agem

ent

Prop

osal

N

umbe

r Ti

tle

(Coo

rdin

atin

g) A

pplic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

re

ques

ted

fund

ing

Exte

rnal

Eva

luat

ion

Reco

mm

enda

tion

2012

-BE-

4001

0-S

Set-

up o

f Ce

ntra

lised

Ser

vice

s to

con

trib

ute

to S

ES

Perf

orm

ance

Ach

ieve

men

t.EU

ROPE

AN

ORG

ANIS

ATIO

N

FOR

THE

SAFE

TY

OF

AIR

NAV

IGAT

ION

(E

URO

-CO

NTR

OL)

BESt

udy

56,8

05,9

4928

,402

,974

.50

50%

No

2012

-EU

-400

07-P

Impl

emen

tatio

n of

Har

mon

ized

Fun

ctio

nalit

y fo

r CO

O-

PAN

S Bu

ild 2

.5LF

VEU

Wor

k7,

072,

778

1,41

4,55

620

%N

o

2012

-EU

-400

08-S

COO

PAN

S O

pera

tiona

l Har

mon

izat

ion

Stud

yLF

VEU

Stud

y3,

768,

934

1,88

4,46

750

%N

o

2012

-EU

-400

13-S

FAB

Cent

ral E

urop

e: P

ilot

Seam

less

Ope

ratio

nAU

STRO

CO

NTR

OL

ÖST

ERRE

ICH

ISCH

E G

ESEL

LSCH

AFT

FÜR

ZIVI

LLU

FTFA

HRT

EUSt

udy

26,0

96,0

5813

,048

,029

50%

No

2012

-HU

-400

11-P

MAT

IAS

Build

10,

dev

elop

men

t of

MAT

IAS

air

traffi

c co

ntro

l sys

tem

Hun

garo

Cont

rol H

unga

rian

Air

Nav

iga-

tion

Serv

ices

Priv

ate

Lim

ited

Com

pany

HU

Wor

k13

,169

,350

2,63

3,87

020

%N

o

2012

-HU

-400

12-P

rTW

R -

Dev

elop

men

t of

rem

ote

(virt

ual)

tow

erH

unga

roCo

ntro

l Hun

garia

n Ai

r N

avig

a-tio

n Se

rvic

es P

rivat

e Li

mite

d Co

mpa

nyH

UW

ork

7,79

6,31

21,

299,

386

16.6

7%N

o

Prop

osal

N

umbe

r Ti

tle

(Coo

rdin

atin

g) A

pplic

ant

MS

Stud

y/W

orks

/Mix

Tota

l elig

ible

co

sts

€TE

N-T

re

ques

ted

fund

ing

% T

EN-T

re

ques

ted

fund

ing

Exte

rnal

Eva

luat

ion

Reco

mm

enda

tion

2012

-AT-

6000

1-P

ETCS

onb

oard

equ

ipm

ent

of T

X Lo

gist

ik A

ustr

ia A

G

loco

mot

ives

to

oper

ate

on E

RTM

S Co

rrid

or B

(E

TCS-

TXLA

)

TX L

ogis

tik A

ustr

ia G

mbH

ATW

ork

2,91

5,75

01,

457,

875

50%

No

2012

-BE-

6002

4-P

ETCS

inst

alle

d on

the

pilo

t co

ache

s ty

pe I1

1 an

d ty

pe

M6

NM

BS/S

NCB

(N

V va

n pu

blie

k re

cht/S

A de

dro

it pu

blic

)BE

Wor

k17

,367

,000

5,83

3,50

033

.59%

No

2012

-DE-

6001

0-P

Equi

pmen

t of

86

frei

ght

loco

mot

ives

with

ETC

S on

-bo

ard-

units

acc

ordi

ng t

o SR

S 2.

3.0d

/ Ba

selin

e 3

Railp

ool G

mbH

DE

Wor

k12

,650

,000

6,32

5,00

050

%Ye

s

2012

-DK-

6000

3-P

Impl

emen

tatio

n of

ERT

MS

Base

line

3 on

pas

seng

er

rolli

ng s

tock

in D

enm

ark

- Fi

rst

of c

lass

Bane

danm

ark

(Rai

l Net

Den

mar

k)D

KW

ork

78,1

93,3

1839

,096

,659

50%

No

2012

-DK-

6002

6-P

Upg

rade

or

equi

pmen

t of

tra

ins

with

bas

elin

e 3

Cont

ec R

ail A

psD

KW

ork

1,11

4,47

255

7,23

650

%N

o

2012

-EU

-600

04-P

Prot

otyp

ing,

te

stin

g,

cert

ifyin

g an

d re

trofi

ttin

g of

TR

AXX

loco

mot

ives

to

ETCS

2.3

.0d

/ Bas

elin

e 3

Mac

quar

ie E

urop

ean

Rail

Lim

ited

(Lux

-em

bour

g Br

anch

)EU

Wor

k37

,465

,056

6,45

0,00

017

.22%

No

2012

-EU

-600

32-S

Faci

litat

ing

and

Spee

ding

up

ERTM

S In

tero

pera

bilit

yM

ultit

elEU

Stud

y10

,668

,816

5,33

4,40

850

%N

o

2012

-FR-

6001

7-S

Form

alis

atio

n of

the

ERT

MS

stan

dard

s fo

r th

e H

SL

equi

pped

with

TVM

Min

istè

re d

e l'é

colo

gie,

du

déve

lopp

e-m

ent

dura

ble,

et

de l’

éner

gie

FRSt

udy

4,01

3,75

6.33

2,00

6,87

8.16

50%

No

2012

-IT-

6002

1-P

ERTM

S D

ATA

LOG

AN

ALYZ

ERM

INIS

TERO

DEL

LE I

NFR

ASTR

UTT

URE

E

DEI

TRA

SPO

RTI

ITW

ork

6,00

0,00

03,

000,

000

50%

No

ERTM

S -

Euro

pean

Rai

l Tra

ffic

Man

agem

ent

Syst

em

26 27

ITS/

EETS

- In

telli

gent

Tra

nspo

rt S

yste

ms/

Euro

pean

Ele

ctro

nic

Toll

Serv

ice

Prop

osal

N

umbe

r Ti

tle

(Coo

rdin

atin

g)

Appl

ican

tM

SSt

udy/

Wor

ks/M

ixTo

tal e

ligib

le

cost

s €

TEN

-T

requ

este

d fu

ndin

g €

% T

EN-T

re

ques

ted

fu

ndin

g

Exte

rnal

Eva

luat

ion

Reco

mm

enda

tion

2012

-ES-

5001

1-S

STM

- S

mar

t Tr

affic

Man

agem

ent

Asoc

iaci

ón E

spañ

ola

de l

a Ca

rret

era

(AEC

)ES

Stud

y1,

883,

200

941,

600

50%

No

2012

-EU

-500

01-P

NEX

T-IT

S –

ITS

on t

he E

xten

ded

Nor

dic

Tria

ngle

Swed

en.

Min

istr

y of

Ent

erpr

ise,

Ene

rgy

and

Com

mun

icat

ions

/ Sw

edis

h Tr

ans-

port

Adm

inis

trat

ion

EUW

ork

134,

427,

000

26,8

85,4

0020

%N

o

2012

-EU

-500

02-S

Geo

Toll

Pay

DG

AE -

Dire

ção-

Ger

al d

as A

tivid

ades

Ec

onóm

icas

(M

inis

tério

da

Econ

omia

e

do E

mpr

ego)

EUSt

udy

325,

344

162,

672

50%

No

2012

-EU

-500

03-P

CITI

ES+

DIR

ECCI

ÓN

GEN

ERAL

DE

TRÁF

ICO

EUW

ork

58,2

50,5

0011

,650

,100

20%

No

2012

-EU

-500

04-P

Arc

Atla

ntiq

ue T

raffi

c M

anag

emen

t Co

rrid

orD

epar

tmen

t fo

r Tr

ansp

ort

EUW

ork

190,

229,

433.

7738

,045

,886

.75

20%

No

2012

-EU

-500

06-P

CRO

COD

ILE

Bund

esm

inis

terim

für

Ver

kehr

, Inn

ova-

tion

und

Tech

nolo

gie

EUW

ork

148,

772,

500

29,7

54,5

0020

%N

o

2012

-EU

-500

07-P

MAG

NA

GRA

ECIA

Min

istr

y of

D

evel

opm

ent,

Com

peti-

tiven

ess,

Inf

rast

ruct

ure,

Tra

nspo

rt a

nd

Net

wor

ks (

Gen

eral

Sec

reta

ry o

f Pu

blic

W

orks

)

EUW

ork

7,93

0,00

01,

586,

000

20%

No

2012

-EU

-500

08-P

Med

TIS

Asso

ciat

ion

des

soci

étés

fr

ança

ises

d'

auto

rout

es (A

SFA)

EUW

ork

164,

150,

500

32,8

30,1

0020

%N

o

2012

-EU

-500

10-P

Cham

eleo

nBu

ndes

min

iste

rium

r Ve

rkeh

r, Ba

u un

d St

adte

ntw

ickl

ung

EUW

ork

183,

098,

508

36,6

19,7

0220

%N

o

2012

-EU

-500

12-P

Corr

idor

du

Sole

ilM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppe-

men

t-du

rabl

e et

de

l'éne

rgie

(MED

DE)

EUW

ork

97,8

54,0

0019

,570

,800

20%

No

2012

-IT-

6002

9-P

ATTR

EZZA

GG

IO D

ELLE

LIN

EE F

ERRO

VIAR

IE E

DEL

MA-

TERI

ALE

ROTA

BILE

DI R

FT E

TFT

CO

N E

RTM

S/ET

CS L

2 E

GSM

-R (S

ST E

SSB

)

RETE

FER

ROVI

ARIA

TO

SCAN

A S.

p.A.

ITW

ork

21,2

55,5

49.9

910

,627

,774

.99

50%

No

2012

-NL-

6000

7-P

Retr

o Fi

ttin

g&U

p gr

adin

g D

iese

l Ve

hicl

es; D

evel

opin

g O

n Bo

ard

Uni

t So

ftw

are

and

Spec

ific

Vehi

cle

Impl

e-m

enta

tion

Des

igns

, Pr

otot

ypin

g,

Test

ing,

Ce

rtify

ing

and

Inst

alla

tion

wor

ks.

DB

Sche

nker

Rai

l Ned

erla

nd N

VN

LW

ork

16,6

14,0

007,

087,

000

42.6

6%N

o

2012

-PL-

6003

1-P

Wdr

ożen

ie s

yste

mu

ERTM

S/ET

CS p

ozio

m 1

na

lini

ach

kole

jow

ych

570

i 64

na o

dcin

ku P

sary

– K

ozłó

wPK

P Po

lski

e Li

nie

Kole

jow

e S.

A.PL

Wor

k2,

312,

370

1,15

6,18

550

%N

o

2012

-SK-

6003

0-S

ERTM

S de

ploy

men

t on

Slo

vak

part

of

the

Corr

idor

E:

stat

e bo

rder

CZ/

SK –

Kút

y –

Junc

tion

Brat

isla

va –

Rus

-ov

ce –

sta

te b

orde

r SK

/HU

Min

istr

y of

Tra

nspo

rt, C

onst

ruct

ion

and

Regi

onal

Dev

elop

men

t of

the

Slo

vak

Repu

blic

SKSt

udy

3,49

2,20

01,

746,

100

50%

No

28 29

MoS

- M

otor

way

s of

the

Sea

PPs

- Pr

iorit

y Pr

ojec

ts (N

ew A

ctio

ns)

Prop

osal

N

umbe

r Ti

tle

(Coo

rdin

atin

g)

Appl

ican

tM

SSt

udy/

Wor

ks/M

ixTo

tal e

ligib

le

cost

s €

TEN

-T

requ

este

d fu

ndin

g €

% T

EN-T

re

ques

ted

fu

ndin

g

Exte

rnal

Eva

luat

ion

Reco

mm

enda

tion

2012

-EU

-210

04-P

Forc

ing

a br

eakt

hrou

gh f

or u

se o

f LN

G in

Mar

itim

e sh

ippi

ngAn

thon

y Ve

der

Rede

rijza

ken

B.V.

EUW

ork

12,3

89,9

583,

746,

947

30.2

4%N

o

2012

-EU

-210

05-S

Tow

ards

Rou

nd-t

he-Y

ear

Win

ter

Nav

igat

ion

with

out

Icer

eaki

ng A

ssis

tanc

e (T

RYN

ICE)

VTT

Tech

nica

l Re

sear

ch C

entr

e of

Fin

-la

ndEU

Stud

y1,

163,

090

581,

545

50%

No

2012

-EU

-210

12-S

LNG

in B

altic

and

Bla

ck S

ea P

orts

Trel

lebo

rgs

Ham

n AB

EUSt

udy

1,15

6,53

9.58

485,

941

42.0

2%N

o

2012

-EU

-210

14-P

ATLA

NTI

CA O

PTIM

oSTe

rmin

als

Org

anis

mo

Públ

ico

Puer

tos

del E

stad

oEU

Wor

k18

,408

,028

3,68

1,60

620

%N

o

2012

-EU

-210

15-S

MAG

ELLA

NO

202

0 –

GRE

EN I

NCE

NTI

VES

FOR

MO

S BA

SED

CO

RRID

ORS

Rete

Aut

ostr

ade

Med

iterr

anee

Spa

EUSt

udy

3,54

7,01

21,

773,

506

50%

No

2012

-EU

-210

16-P

Impr

ovem

ent o

f m

ulti-

mod

al tr

ansp

ort a

nd s

ea-b

ased

lin

k Sw

inou

jsci

e-Tr

elle

borg

Trel

lebo

rgs

Ham

n AB

EUW

ork

22,9

96,7

424,

543,

670

19.7

6%N

o

2012

-EU

-210

18-S

Trai

nMoS

2U

NIV

ERSI

TY O

F ST

RATH

CLYD

EEU

Stud

y2,

548,

696

1,27

4,34

850

%N

o

2012

-EU

-210

22-P

Both

niaL

NG

The

Balti

c In

stitu

te o

f Fi

nlan

dEU

Wor

k51

,124

,600

15,1

03,0

5029

.54%

No

2012

-EU

-210

24-S

“SEA

PLAN

ES-S

EE”:

Seap

lane

s “D

ossi

er &

Ten

der”

for

So

uth

East

Eur

ope

Ope

ratio

nsEP

SILO

N IN

TERN

ATIO

NAL

SA

EUSt

udy

1,66

0,00

083

0,00

050

%N

o

Prop

osal

N

umbe

r Ti

tle

(Coo

rdin

atin

g)

Appl

ican

tM

SSt

udy/

Wor

ks/M

ixTo

tal e

ligib

le

cost

s €

TEN

-T

requ

este

d fu

ndin

g €

% T

EN-T

re

ques

ted

fu

ndin

g

Exte

rnal

Eva

luat

ion

Reco

mm

enda

tion

2012

-AT-

1703

4-P

Prio

rity

TEN

-axi

s N

o. 1

7, A

ustr

ian

part

in s

ub-s

ectio

n "M

unic

h–Sa

lzbu

rg, S

alzb

urg–

Vien

na, V

ienn

a–Br

atis

la-

va”;

Gap

-clo

sure

bet

wee

n H

uber

tend

orf

and

Blin

den-

mar

kt (v

ia B

urgs

talle

rtun

nel)

to e

nabl

e th

e re

quire

d fo

ur-t

rack

ope

ratio

n fo

r "Y

bbs

– Am

stet

ten"

Bund

esm

inis

teriu

m f

ür V

erke

hr,

Inno

-va

tion

und

Tech

nolo

gie

ATW

ork

67,8

48,9

31.3

413

,569

,786

.27

20%

Yes

2012

-AT-

1710

0-S

Prio

rity

TEN

-axi

s N

o. 1

7, in

sub

-sec

tion

“Mun

ich–

Salz

-bu

rg,

Salz

burg

–Vie

nna,

Vi

enna

–Bra

tisla

va”;

“Des

ign

stud

y le

adin

g to

and

Env

ironm

enta

l Im

pact

Ass

ess-

men

t ne

cess

ary

for

the

impl

emen

tatio

n of

the

gap

-cl

osur

e Sa

lzbu

rg –

Ste

indo

rf/S

traß

wal

chen

Bund

esm

inis

teriu

m f

ür V

erke

hr,

Inno

-va

tion

und

Tech

nolo

gie

ATSt

udy

8,58

1,40

04,

290,

700

50%

Yes

2012

-AT-

1710

6-P

Prio

rity

TEN

-axi

s N

o. 1

7 in

sub

-sec

tion

“Mun

ich

– Sa

lz-

burg

(cr

oss-

bord

er),

Salz

burg

– V

ienn

a, a

nd V

ienn

a –

Brat

isla

va”;

Inte

grat

ion

of t

he t

hree

tra

cks

from

“Fr

ei-

lass

ing

– Sa

lzbu

rg”

into

Sal

zbur

g M

ain

Trai

n St

atio

n (“

wor

ks”)

Bund

esm

inis

teriu

m f

ür V

erke

hr,

Inno

-va

tion

und

Tech

nolo

gie

ATW

ork

108,

915,

300

21,7

83,0

6020

%Ye

s

28 29

2012

-AT-

1710

8-P

PP17

sub

-sec

tion

“Mun

ich–

Salz

burg

, Sal

zbur

g–Vi

enna

, Vi

enna

– Br

atis

lava

”; co

nnec

tion

Vien

na –

Slo

vaki

an

bord

er n

ear

Mar

cheg

g; e

lect

rifica

tion

and

two-

trac

k up

grad

ing

Wie

n-St

adla

u –

Wie

n-As

pern

(sh

ort

title

: “u

pgra

ding

Wie

n-St

adla

u –

Wie

n-As

pern

”)

Bund

esm

inis

teriu

m f

ür V

erke

hr,

Inno

-va

tion

und

Tech

nolo

gie

ATW

ork

25,2

52,0

005,

050,

400

20%

No

2012

-BE-

2410

3-P

Wor

ks fo

r Rai

l Fre

ight

Cor

ridor

8 o

n th

e Be

lgia

n te

rrito

-ry

: ele

ctrifi

catio

n w

orks

Her

enta

ls-M

ol, t

rans

form

atio

n tr

ack

confi

gura

tion

Nee

rpel

t, re

-ope

ning

the

tra

in s

top

at H

amon

t, up

grad

ing

exis

ting

sign

allin

g te

chno

logy

.

Infr

abel

sa

BEW

ork

40,2

20,0

27.2

68,

044,

005.

4620

%Ye

s

2012

-BE-

2810

2-P

Mis

e à

quat

re v

oies

de

la li

gne

161

entr

e W

ater

mae

l et

la b

ifurc

atio

n de

Lou

vain

-la-

Neu

veIn

frab

el s

aBE

Wor

k25

9,58

1,68

6.58

51,9

16,3

37.3

220

%Ye

s

2012

-DK-

2001

1-P

New

rai

lway

lin

e be

twee

n Co

penh

agen

and

Rin

gste

d (w

orks

)- u

pgra

ding

the

rai

lway

acc

ess

lines

to

the

fu-

ture

Feh

mar

n Be

lt fix

ed li

nk

Bane

danm

ark

(Rai

l Net

Den

mar

k)D

KW

ork

667,

347,

135

133,

469,

425

20%

Yes

2012

-DK-

2001

4-P

Upg

radi

ng t

he s

ectio

n fr

om R

ings

ted

to R

ødby

(wor

ks)

- up

grad

ing

the

railw

ay a

cces

s lin

es t

o th

e fu

ture

Fe-

hmar

n Be

lt fix

ed li

nk

Bane

danm

ark

(Rai

l Net

Den

mar

k)D

KW

ork

57,2

54,4

3711

,450

,887

20%

Yes

2012

-DK-

2002

7-S

New

Sto

rstr

øm B

ridge

(st

udie

s) –

upg

radi

ng t

he r

ail-

way

acc

ess

line

to t

he f

utur

e Fe

hmar

n Be

lt fix

ed li

nkBa

neda

nmar

k (R

ail N

et D

enm

ark)

DK

Stud

y30

,041

,000

15,0

20,5

0050

%Ye

s

2012

-ES-

0310

1-P

NU

EVO

ACC

ESO

SU

R FE

RRO

VIAR

IO A

L PU

ERTO

DE

BARC

ELO

NA.

FAS

E I

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k59

,000

,000

11,8

00,0

0020

%N

o

2012

-ES-

0809

4-P

Plat

form

Wor

ks o

n se

ctio

n Vi

go –

San

tiago

de

Com

-po

stel

a. E

je A

tlant

ico

de A

lta V

eloc

idad

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k22

6,94

5,52

045

,389

,104

20%

Yes

2012

-ES-

0809

5-P

Supp

ly, t

rack

ass

embl

y, e

lect

rical

, sig

nalin

g, t

elec

om-

mun

icat

ions

and

civ

il pr

otec

tion

faci

litie

s an

d se

rvic

es

for

follo

w-u

p on

sec

tion

Vigo

– A

Cor

uña.

Eje

Atlá

ntic

o Al

ta V

eloc

idad

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k19

7,09

4,61

239

,418

,922

20%

Yes

2012

-ES-

1401

6-S

Airp

ort

link

Tene

rife

Nor

th-S

outh

with

an

inno

vativ

e an

d m

oder

n ra

ilway

sys

tem

, the

Mag

lev

Cabi

ldo

Insu

lar

de T

ener

ifeES

Stud

y1,

000,

000

500,

000

50%

No

2012

-ES-

1602

9-S

Tech

nica

l Ac

tuat

ions

for

the

opt

imiz

atio

n of

Fre

ight

Ra

ilway

Axi

s Si

nes/

Alge

cira

s-M

adrid

-Par

ís (

PP16

) an

d th

e pl

anni

ng o

n th

e Sp

anis

h ex

istin

g pa

rt

Fund

acio

n Tr

ansp

irena

ica-

Trav

esia

Ce

ntra

l del

Piri

neo

ESSt

udy

1,20

0,00

060

0,00

050

%N

o

2012

-ES-

1900

4-P

Mad

rid-G

alic

ia H

igh-

Spee

d Ra

il. S

ectio

n: C

erna

dilla

-Pe

dral

ba d

e la

Pra

dería

-Pad

orne

lo T

unne

lSO

CIED

AD E

STAT

AL D

E IN

FRAE

STRU

C-TU

RAS

DEL

TRA

NSP

ORT

E TE

RRES

TRE,

S.

A.

ESW

ork

219,

054,

606.

8943

,810

,921

.38

20%

Yes

2012

-ES-

1900

5-P

Mad

rid-G

alic

ia H

igh-

Spee

d m

ixed

tra

ffic

Rail.

Sec

tion:

Za

mor

a-La

Hin

iest

aSO

CIED

AD E

STAT

AL D

E IN

FRAE

STRU

C-TU

RAS

DEL

TRA

NSP

ORT

E TE

RRES

TRE,

S.

A.

ESW

ork

44,1

97,4

82.2

68,

839,

496.

4520

%Ye

s

2012

-ES-

1904

2-P

IMPL

ANTA

CIÓ

N D

EL A

NCH

O U

IC E

N E

L CO

RRED

OR

MED

ITER

RÁN

EO.

TRAM

O:

VAN

DEL

LÓS-

ALM

USS

AFES

. FA

SE 1

.

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k48

3,88

0,60

096

,776

,120

20%

Yes

2012

-ES-

1908

2-P

Plat

form

Wor

ks o

n su

bsec

tion

San

Isid

ro -

Orih

uela

an

d se

rvic

es f

or f

ollo

w-u

p w

orks

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k12

8,32

4,44

525

,664

,889

20%

Yes

2012

-ES-

1908

4-P

Plat

form

wor

ks o

n th

e su

bsec

tions

Lub

ian

- Tu

nel d

e la

Can

da, T

unel

de

la C

anda

- V

ilave

lla a

nd T

unel

de

O

Cañi

zo (V

ia iz

quie

rda)

and

ser

vice

s fo

r fol

low

-up

wor

ks

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k20

2,25

9,18

040

,451

,836

20%

Yes

30 31

2012

-ES-

1908

5-P

Plat

form

and

Tra

ck B

ed W

orks

on

the

subs

ectio

ns

“Nud

o de

La

Enci

na –

Mog

ente

and

Mog

ente

-Alc

udia

de

Cre

spin

s”

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k59

,243

,785

11,8

48,7

5720

%N

o

2012

-ES-

1908

8-P

Supp

ly, T

rack

ass

embl

y an

d En

ergy

fac

ilitie

s on

the

Ol-

med

o -

Zam

ora

- Pe

dral

ba d

e la

Pra

dería

HSR

L se

ctio

nAD

MIN

ISTR

ADO

R D

E IN

FRAE

STRU

CTU

-RA

S FE

RRO

VIAR

IAS

ESW

ork

162,

367,

078

32,4

73,4

1620

%Ye

s

2012

-ES-

1909

7-P

Supp

ly, t

rack

ass

embl

y, e

lect

rical

, sig

nalin

g, t

elec

om-

mun

icat

ion

acou

stic

and

civ

il pr

otec

tion

faci

litie

s on

th

e se

ctio

n Al

bace

te-A

lican

te o

f th

e H

SRL

Mad

rid-

Leva

nte

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k19

4,99

0,23

238

,998

,046

20%

Yes

2012

-ES-

1911

4-P

Supp

ly,

trac

k as

sem

bly

and

com

plem

enta

ry w

orks

, el

ectr

ical

, sig

nalin

g an

d te

leco

mm

unic

atio

ns f

acili

ties

on t

he M

edite

rran

ean

Corr

idor

Rai

lway

Lin

k -

LAV

Ma-

drid

- B

arce

lona

- F

renc

h Bo

rder

ADM

INIS

TRAD

OR

DE

INFR

AEST

RUCT

U-

RAS

FERR

OVI

ARIA

SES

Wor

k20

1,62

3,44

240

,324

,689

20%

Yes

2012

-EU

-160

19-S

Estu

dios

par

a la

ade

cuac

ión

de l

as i

nfra

estr

uctu

ras

exis

tent

es

en

la

línea

in

tern

acio

nal

Zara

goza

-Can

-fr

anc-

Pau

de c

ara

al r

esta

blec

imie

nto

de l

os t

ráfic

os

ferr

ovia

rios

Gob

iern

o de

Ara

gón

EUSt

udy

7,86

9,52

43,

934,

762

50%

No

2012

-EU

-171

18-P

Conn

ectin

g Pr

iorit

y Pr

ojec

t TE

N A

xis

17 (

rail)

with

Pri-

ority

Pro

ject

18

(IWW

): Pr

iorit

y Pr

ojec

t in

Sub

-Sec

tion

Salz

burg

-Wie

n: E

NN

S M

ULT

IMO

DAL

Kain

dl In

vest

Gm

bHEU

Wor

k73

,739

,476

.40

14,7

47,8

9520

%Ye

s

2012

-FI-

1206

3-P

E18

Ring

Roa

d III

2nd

pha

se (A

irpor

t ro

ad)

The

Min

istr

y of

Tra

nspo

rt a

nd C

omm

u-ni

catio

nsFI

Wor

k87

,600

,000

18,0

30,0

0020

.58%

Yes

2012

-FI-

1211

9-P

E18

mot

orw

ay a

t Ko

tka

The

Min

istr

y of

Tra

nspo

rt a

nd C

omm

u-ni

catio

nsFI

Wor

k32

,000

,000

6,67

0,00

020

.84%

Yes

2012

-FR-

0305

2-P

Dép

loie

men

t du

GSM

-R s

ur le

s pr

ojet

s pr

iorit

aire

sM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppe-

men

t du

rabl

e, e

t de

l’én

ergi

eFR

Wor

k10

3,47

8,26

123

,293

,226

22.5

1%Ye

s

2012

-FR-

0311

0-P

Lign

e à

gran

de v

itess

e Su

d Eu

rope

Atla

ntiq

ue (

LGV

SEA)

- T

ours

Bor

deau

xM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppe-

men

t du

rabl

e, e

t de

l’én

ergi

eFR

Wor

k3,

624,

944,

058

724,

988,

811

20%

Yes

2012

-FR-

0311

2-S

Lign

e no

uvel

le f

erro

viai

re e

ntre

Mon

tpel

lier

et P

erpi

g-na

nM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppe-

men

t du

rabl

e, e

t de

l’én

ergi

eFR

Stud

y10

,000

,000

5,00

0,00

050

%N

o

2012

-FR-

1605

5-P

Olo

ron

Bedo

usM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppe-

men

t du

rabl

e, e

t de

l’én

ergi

eFR

Wor

k10

2,00

0,00

030

,600

,000

30%

Yes

2012

-FR-

1705

1-P

Lign

e à

gran

de v

itess

e Es

t Eu

ropé

enne

pha

se 2

(LG

V EE

) - B

audr

ecou

rt V

ende

nhei

mM

inis

tère

de

l'éco

logi

e, d

u dé

velo

ppe-

men

t du

rabl

e, e

t de

l’én

ergi

eFR

Wor

k67

0,00

0,00

013

4,00

0,00

020

%Ye

s

2012

-IE-

2603

5-P

Rem

oval

of

Leve

l Cro

ssin

g an

d Co

nstr

uctio

n of

Ove

r-br

idge

at

Reill

y's

Cros

sing

on

the

Dub

lin t

o M

ayno

oth

Rail

Line

Dep

artm

ent

of T

rans

port

, Tou

rism

and

Sp

ort

IEW

ork

7,88

9,00

01,

578,

000

20%

No

2012

-IE-

2603

8-S

Dev

elop

men

t of

a

repl

acem

ent

Cent

ralis

ed

Traffi

c Co

ntro

l Ce

ntre

- S

trat

egy

Stud

y an

d D

etai

led

Des

ign

for

Tend

er

Dep

artm

ent

of T

rans

port

, Tou

rism

and

Sp

ort

IESt

udy

2,48

2,00

01,

241,

000

50%

No

2012

-IT-

0107

3-P

Pote

nzia

men

to t

ecno

logi

co N

odo

di R

oma:

fas

i.M

inis

tero

de

lle

Infr

astr

uttu

re

e de

i Tr

aspo

rti

ITW

ork

71,4

00,0

0014

,280

,000

20%

No

2012

-IT-

0107

7-P

Pote

nzia

men

to T

ecno

logi

co N

odo

di F

irenz

e.M

inis

tero

de

lle

Infr

astr

uttu

re

e de

i Tr

aspo

rti

ITW

ork

26,8

26,0

005,

365,

200

20%

No

2012

-IT-

0107

8-P

Nod

o AV

/AC

di B

olog

na:

com

plet

amen

to p

assa

nte

e op

ere

ferr

ovia

rie d

ella

sta

zion

e AV

.M

inis

tero

de

lle

Infr

astr

uttu

re

e de

i Tr

aspo

rti

ITW

ork

77,9

33,6

2515

,586

,725

20%

Yes

30 31

2012

-IT-

0110

9-S

MPM

– B

Z M

aste

rpla

n Pi

ano

Mob

ilità

sta

zion

e fe

rrov

i-ar

ia d

i Bol

zano

Area

le B

olza

no -

ABZ

S.p

.A.

ITSt

udy

2,51

9,57

4.30

1,25

9,78

7.15

50%

No

2012

-IT-

0607

4-S

Cint

ura

di T

orin

o : P

roge

ttaz

ione

Defi

nitiv

a tr

atta

Av-

iglia

na -

Orb

assa

no.

Min

iste

ro

delle

In

fras

trut

ture

e

dei

Tras

port

iIT

Stud

y32

,310

,000

16,1

55,0

0050

%N

o

2012

-IT-

0607

5-P

Pote

nzia

men

to T

ecno

logi

co T

orin

o -

Pado

va: i

mpi

anti

di li

nea

e di

sta

zion

e.M

inis

tero

de

lle

Infr

astr

uttu

re

e de

i Tr

aspo

rti

ITW

ork

211,

289,

940

42,2

57,9

8820

%Ye

s

2012

-IT-

2407

6-P

Trat

ta A

V/AC

Ter

zo V

alic

o de

i Gio

vi: o

pere

e 2°

lott

o co

stru

ttiv

o.M

inis

tero

de

lle

Infr

astr

uttu

re

e de

i Tr

aspo

rti

ITW

ork

463,

706,

340

92,7

41,2

6820

%Ye

s

2012

-LU

-280

32-P

Luxe

mbo

urg

rail

netw

ork.

Eu

roCa

p-Ra

il.

Line

fr

om

Luxe

mbo

urg

to

Klei

nbet

tinge

n (lu

xem

bour

g/be

lgia

n bo

rder

). Re

-ele

ctrifi

catio

n of

the

rai

lway

lin

e in

2AC

25

kV 5

0Hz.

Min

istè

re d

u D

ével

oppe

men

t du

rabl

e et

des

Infr

astr

uctu

res

LUW

ork

39,8

93,1

257,

978,

625

20%

No

2012

-NL-

2400

8-P

Exte

nsio

n ra

ilway

yar

d M

aasv

lakt

e W

est

- Po

rt o

f Ro

t-te

rdam

– r

ail f

reig

ht c

orrid

or 8

(PP

24)

- ph

ase

2 Im

-pl

emen

tatio

n

ProR

ail B

.V.

NL

Wor

k76

,449

,003

15,2

89,8

0020

%N

o

2012

-NL-

2400

9-S

Des

ign

exte

nsio

n ra

ilway

ya

rd

Rail

Serv

ice

Cent

re

Waa

lhav

en Z

uid

– Po

rt o

f Ro

tter

dam

ProR

ail B

.V.

NL

Stud

y2,

912,

235

1,45

6,11

750

%N

o

2012

-SE-

1202

1-S

The

Wes

tern

Lin

k -

railw

ay t

unne

l in

Got

henb

urg

Swed

ish

Tran

spor

t Ad

min

istr

atio

nSE

Stud

y58

,104

,846

29,0

52,4

2350

%Ye

s

2012

-SE-

1202

6-P

Rout

e E4

Rel

ievi

ng o

f bo

ttle

neck

s an

d in

crea

sed

ca-

paci

ty w

est

of H

agas

tade

nTr

afikv

erke

tSE

Wor

k54

,736

,000

10,9

47,2

0020

%N

o

2012

-SE-

1203

6-S

Stoc

khol

m B

ypas

s, d

evel

opm

ent o

f co

nstr

uctio

n Pl

ans.

Trafi

kver

ket

(Sw

edis

h Tr

ansp

ort

Ad-

min

istr

atio

n)SE

Stud

y11

6,40

5,00

058

,202

,500

50%

Yes

2012

-SE-

1204

4-P

Fina

l se

ctio

n of

th

e E6

m

otor

way

Co

penh

agen

-G

othe

nbur

g-O

slo

Swed

ish

Tran

spor

t Ad

min

istr

atio

nSE

Wor

k71

,011

,950

14,2

02,3

9020

%Ye

s

2012

-SE-

1204

7-P

The

prio

rity

proj

ect

City

line

Stoc

khol

m –

an

impo

rtan

t lin

k in

the

Nor

dic

Tria

ngle

Swed

ish

Tran

spor

t Ad

min

istr

atio

nSE

Wor

k59

8,37

2,00

011

9,67

4,30

020

.%Ye

s

2012

-SE-

1206

8-P

E6.2

1 M

arie

holm

Tun

nel

Swed

ish

Tran

spor

t Ad

min

istr

atio

nSE

Wor

k11

4,75

7,20

822

,951

,442

20%

Yes

2012

-UK-

1303

9-P

Rem

ovin

g Bo

ttle

neck

s on

Prio

rity

Axis

13:

A75

Im

-pr

ovem

ents

Dep

artm

ent

for

Tran

spor

tU

KW

ork

30,1

90,8

63.3

06,

038,

172.

6620

%Ye

s

2012

-UK-

1309

0-P

Rem

ovin

g Bo

ttle

neck

s on

PP1

3: A

14 J

7 -

9 Ke

tter

ing

Bypa

ss Im

prov

emen

tD

epar

tmen

t fo

r Tr

ansp

ort

UK

Wor

k99

,678

,259

19,9

35,6

5120

%Ye

s

2012

-UK-

1309

1-P

Rem

ovin

g Bo

ttle

neck

s on

PP1

3: M

6 J1

0a -

13

Man

-ag

ed M

otor

way

Sch

eme

Dep

artm

ent

for

Tran

spor

tU

KW

ork

46,7

82,5

469,

356,

508

20%

Yes

2012

-UK-

2601

7-P

Port

Sal

ford

– R

emov

ing

Bott

lene

cks

and

Impr

ovin

g In

term

odal

ity o

n Pr

iorit

y Ax

es P

P26

and

PP14

Dep

artm

ent

for

Tran

spor

tU

KW

ork

37,4

52,6

807,

490,

536

20%

Yes

2012

-UK-

2606

2-P

Com

plet

ing

Prio

rity

Axis

26

(Liv

erpo

ol t

o H

ull)

and

Del

iver

ing

the

TEN

-T C

ore

Rail

Net

wor

k in

the

Uni

ted

King

dom

: Nor

ther

n H

ub

Dep

artm

ent

for

Tran

spor

tU

KW

ork

114,

267,

457.

9022

,853

,491

.57

20%

Yes

2012

-UK-

2606

5-S

PP26

: Im

prov

ing

Inte

rmod

al A

cces

s to

Liv

erpo

ol P

ort

Dep

artm

ent

for

Tran

spor

tU

KSt

udy

1,11

8,40

055

9,20

050

%N

o

32 33

PPs

- Pr

iorit

y Pr

ojec

ts (O

ngoi

ng A

ctio

ns)

Prop

osal

N

umbe

r Ti

tle

(Coo

rdin

atin

g)

Appl

ican

tM

SSt

udy/

Wor

ks/M

ixTo

tal e

ligib

le

cost

s €

TEN

-T

requ

este

d fu

ndin

g €

% T

EN-T

re

ques

ted

fu

ndin

g

Exte

rnal

Eva

luat

ion

Reco

mm

enda

tion

2012

-AT-

0108

0-P

Wor

ks f

or c

onst

ruct

ion

of n

ew h

igh

spee

d lin

e be

-tw

een

Kund

l/Rad

feld

and

Bau

mki

rche

nBu

ndes

min

iste

rium

für

Ver

kehr

, In

no-

vatio

n un

d Te

chno

logi

eAT

Wor

k86

,400

,000

12,9

60,0

0015

%Ye

s

2012

-AT-

1704

5-P

Wor

ks a

nd S

tudi

es fo

r upg

radi

ng th

e W

ien

- Br

atis

lava

ra

ilway

line

(6 s

ubpr

ojec

ts)

Bund

esm

inis

teriu

m f

ür V

erke

hr,

Inno

-va

tion

und

Tech

nolo

gie

ATW

ork

377,

480,

000

60,2

83,5

5715

.97%

Yes

2012

-BE-

0210

4-P

Dia

bolo

- R

acco

rdem

ent

ferr

ovia

ire d

e l'a

érop

ort

de

Zave

ntem

au

rése

au à

gra

nde

vite

sse

Thal

ysIn

frab

el S

ABE

Wor

k32

,255

,511

.32

6,45

1,10

2.26

20%

Yes

2012

-BE-

2811

1-P

Euro

Cap-

Rail

Infr

abel

sa

BEW

ork

194,

513,

459.

1238

,902

,691

.83

20%

Yes

2012

-EU

-210

28-P

Balti

c Se

a H

ub a

nd S

poke

s Pr

ojec

tTh

e M

unic

ipal

ity o

f Aa

rhus

EUW

ork

83,6

64,6

4021

,450

,401

25.6

4%Ye

s

2012

-SE-

1202

0-P

Wor

ks fo

r con

stru

ctio

n of

the

road

sec

tion

Nor

ra L

änk-

en. (

Nor

ther

n Li

nk) I

ncre

ased

sup

port

Trafi

kver

ket

(Sw

edis

h Tr

ansp

ort

Ad-

min

istr

atio

n)SE

Wor

k25

1,63

2,80

950

,326

,561

20%

Yes

32 33

34

3. Info sheets of project proposals submitted under the 2012 TEN-T Multi-Annual Call for Proposals

1. Project proposals recommended for funding

2. Project proposals NOT recommended for funding

89 project info sheets starting on page 35

100 project info sheets starting on page 131

This section contains the info sheets of the individual project proposals recommended and not recommended for funding organised by priority and transport mode.

ATM ............................................................................................................................................................................................................................................... 35ERTMS .......................................................................................................................................................................................................................................... 39ITS/EETS...................................................................................................................................................................................................................................... 54MoS ............................................................................................................................................................................................................................................... 57RIS.................................................................................................................................................................................................................................................. 71PPs (New Actions) ................................................................................................................................................................................................................. 76PPs (Ongoing Actions) ..................................................................................................................................................................................................... 116

ATM ............................................................................................................................................................................................................................................ 131ERTMS ....................................................................................................................................................................................................................................... 135ITS/EETS................................................................................................................................................................................................................................... 141MoS ............................................................................................................................................................................................................................................ 146PPs (New Actions) .............................................................................................................................................................................................................. 151PPs (Ongoing Actions) ..................................................................................................................................................................................................... 179

35

Multi-Annual Call 2012Projects recommended for funding

ATM

Air Traffic Management

• Remarks go here •

Evaluation remarks

36

TheproposedActionisconsideredtobeveryrelevantasitfullyaddressesallthecriteriaandtheobjectivesestablishedforthecallforproposalsandasithasaclearlinkagetotheInterimDeploymentPlan.Itsmaturityisconsideredtobegood.Overall,theproposedActiondemonstratesahighpotentialimpact,whichisprimarilybasedonimpactsarisingfromtheglobalimplementationoftheInterimDeploymentPlan.Theproposalisclearandcoherent.

Evaluation remarks

Activities to support the implementation of the IDP within

DANUBE FAB2012-EU-40003-S

The aim of the Action is the deployment of the initial set of SESAR solutions at DANUBE FAB level, concretely the air ground data link and airspace management (free routes). As such, it addresses the priorities of the Interim Deployment

Programme (IDP), which describes the implementation activities of essential ATM operational changes as identified by the European Air Traffic Management Master Plan and which details short term implementation activities.

ATMMember States involved:Bulgaria, Romania

Applicant:State Enterprise “Bulgarian Air Traffic Services Authority” BULATSA

Requested fundingTotal eligible costs €2,788,420

TEN-T requested funding: €1,394,210

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €2,788,000

TEN-T recommended funding: €1,394,000

TEN-T funding: 50%

Evaluation remarks

37

TheproposedActionisrelevanttothecallforproposalsasitaimstomakethefirststepincoordinatingthevariousstakeholdersinvolvedintheInterimDeploymentPlanandcreatingabaselineofSESAR.Overall,theproposalisverymatureandreadytostartasitisbuildingonpreviousworkundertaken.TheimpactoftheproposedActionisgoodandconsideredtobeprovidedbythecontributaryachievementstowardstheInterimDeploymentPlan.Thequalityisgood.

The proposed Action aims at supporting the implementation of the key technological enablers and procedures as defined in the Interim Deployment Programme (IDP).

Based on the IDP, which derives from the European ATM Master Plan and focuses on the SESAR baseline, the present Action aims at fostering the implementation of five out of the seven IDP Activity Areas in order to achieve the requested initial operational capability by December 2014:

•Activityarea2-Airspacemanagementimprovementsanddatasharing•Activityarea3-AirportCDM•Activityarea4-Air-grounddatalink•ActivityArea5-Automatedassistancetocontrollersforseamlesscoordinationtransferanddialogue•ActivityArea6-RNPApproach

ATMMember States involved:Italy, Cyprus, Germany, Estonia, Spain, Finland, France, Latvia, Malta, Portugal, United Kingdom

Applicant:ENAV S.p.A.

Requested fundingTotal eligible costs €253,778,950.55

TEN-T requested funding: €50,755,790.11

TEN-T funding: 20%

Recommended fundingTotal eligible costs €253,775,000

TEN-T recommended funding: €50,755,000

TEN-T funding: 20%

2012-EU-40004-P

ANSPs interim deployment programme implementation

• Remarks go here •

Evaluation remarks

38

TheproposedActionishighlyrelevantasitaddressestheTEN-Tprioritiesverywellandsupportstheobjectivesandexpectedresultsofthecallforproposals.Itishighlymature,asitisusesexistinginteroperabilityspecificationsandhasreceivednecessaryapprovals.Moreover,theproposedActionbuildsonworkalreadyundertakenandonthefurtherdevelopmentoftwoexistingsystems.Theproposalisexpectedtomakeapositivecontributiontoglobalinteroperabil-ity.Overall,theproposal’squalityissufficientlygood.

Evaluation remarks

Accelerating the deployment of advanced FDP capabilities in Europe

2012-EU-40006-S

The proposed Action is a study to support the achievement of improved ATM performance (safety, capacity, flight efficiency and cost effectiveness) by accelerating the development and thus implementation of advanced Flight Data Processing

(FDP) capabilities in the European Area. It will be undertaken by members of the “A6” group of Air Navigation Service Provid-ers: AENA (Spain), Austro Control (Austria), DFS (Germany), DSNA (France), ENAV (Italy), IAA (Ireland), LFV (Sweden) and NATS (UK). Austro Control, IAA and LFV are members of the NORACON consortium, which constitutes the sixth member of the A6.

ATMMember States involved:United Kingdom, Austria, Germany, Spain, France, Ireland, Italy, Sweden

Applicant:

NATS (EN ROUTE) PLC

Requested fundingTotal eligible costs €13,310,512.70

TEN-T requested funding: €6,655,256.35

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €13,310,000

TEN-T recommended funding: €6,655,000

TEN-T funding: 50%

39

Multi-Annual Call 2012Projects recommended for funding

European Rail Traffic Management System

ERTMS

Evaluation remarks

40

ERTMSMember States involved:Belgium

Applicant:Infrabel nv

Requested fundingTotal eligible costs €23,954,580

TEN-T requested funding: €11,977,290

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €23,854,000

TEN-T recommended funding: €11,927,000

TEN-T funding: 50%

The Global Project aims to equip the entire Belgian rail network and train fleet with ETCS by 2022 (as indicated in both Infrabel and NMBS’s ETCS master plans). The proposed Action concerns the equipment of three new lines and the upgrade

of two existing lines with ERTMS Level 1/2, ETCS version 2.3.0d (totalling +/- 146 km double track and 4 km single track line).

TheproposedActionisrelevanttothecallforproposalsandinlinewiththeTEN-Tpriorities.Itsmaturityisgood.ThemainpositiveimpactsoftheActionwillbeonsafety,qualityofservice,interoperablityandtrafficmanagement.Thequalityoftheproposalisgood.

2012-BE-60027-P

Equipment of ETCS1 on HSL L2, upgrade of HSL L3 and L4 to ETCS2 v2.3.0d, equipment

of ETCS1 v2.3.0d on L10 and L36C/2

Evaluation remarks

41

TheproposedActionsufficientlydemonstrateditshighrelevancetothecallforproposalsandTEN-TprioritiesasitaddressesERTMSdeployment.ThematurityoftheActionisgoodandsois itsexpectedimpact.Thequalityoftheproposalisgood.

The proposal concerns equipment of 15 class 185.2 locomotives (+10 optional locomotives) with ETCS Level 2 (and Level 1 with Euroloop) SRS 2.3.0d (with hardware prepared for Baseline 3). It is part of a Global Project that aims at creating

an international pool of ETCS locomotives owned by the applicant, that will use the ETCS trackside equipment in The Nether-lands and Switzerland, as well as Austria, Denmark, Sweden, France, Belgium, Italy and Germany in the future. Following the completion of the Action, the locomotives will be authorised to operate on the ERTMS equipped lines in Austria and Germany.

ETCS equipment of DB Schenker Rail locomo-tives for interoperable freight traffic in

Austria (TEN-T PP17 and ERTMS Corridor B)

2012-DE-60013-P

ERTMS Member States involved:Germany

Applicant:DB Schenker Rail AG

Requested fundingTotal eligible costs €3,750,000

TEN-T requested funding: €1,875,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €2,250,000

TEN-T recommended funding: €1,125,000

TEN-T funding: 50%

Evaluation remarks

42

TheproposedActionfullymeetstheobjectivesandconditionsofthecallforproposalsasanimportantstepforthede-ploymentandoperationoftheonboardEuropeanTrainControlSystem.TheActionismatureasithasalreadystarted.TheimpactoftheActionishighlypositiveandverywellsubstantiated.Theproposalisofgoodquality.

TheproposedactionispartoftheGlobalProjectimplementedbyDBSchenkerRail(DBSR)withtheaimtocreateanin-ternationalfleetofinteroperablelocomotivesthatwillusetheETCStracksideequipmentintheNetherlands,Switzerland,

Austria,Denmark,Sweden,France,Belgium,ItalyandGermany.TheActionincludesworkstoretrofit47locomotivesclass185(ETCSLevel2)withSRS2.3.0d(withhardwarepreparedforbaseline3andupgradeof10locomotivesclass185(ETCSLevel2)fromSRS2.2.2(+CR)to2.3.0d(withhardwarepreparedforbaseline3).

ETCS equipment of DB Schenker Rail locomotives for interoperable freight

traffic on ERTMS Corridor A2012-DE-60014-P

ERTMS Member States involved:Germany

Applicant:DB Schenker Rail AG

Requested fundingTotal eligible costs €8,850,000

TEN-T requested funding: €4,425,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €8,850,000

TEN-T recommended funding: €4,425,000

TEN-T funding: 50%

Evaluation remarks

43

TheproposedActionisveryrelevanttothecallforpropsoalsasitcontributestoERTMSdeployment.TheActionisreadytostartfromthetechnicalpointofview.Itisexpectedtohaveaverygoodimpactintermsofsafetyandinteroper-ability,aswellasinenvironmentalterms.Theoverallqualityoftheproposalissatisfactory.

The proposed Action consists of an upgrade of 10 BR189 locomotives to ETCS baseline 3, and retrofit of 6 BR185 locomotives and 8 EU43 locomotives to ETCS baseline 2.

2012-DE-60025-P

Upgrade, prototyping, retrofitting and testing LOKOMOTION locomotives to

ETCS 2.3.0d / Baseline 3

ERTMSMember States involved:Germany

Applicant:Lokomotion Gesellschaft für Schienentrak-tion mbH

Requested fundingTotal eligible costs €9,090,000

TEN-T requested funding: €1,800,000

TEN-T funding: 19.8%

Recommended fundingTotal eligible costs: €9,090,000

TEN-T recommended funding: €1,800,000

TEN-T funding: 19.8%

Evaluation remarks

44

The proposed Action is relevant to the call for proposals as it addresses ERTMS deployment. Itsmaturity is welldemonstratedastheActionisreadytostartfromatechnicalpointofview.ItisexpectedthattheActionwillproducesignificantsocio-economicimpacts.Thequalityoftheproposalisgood.Takingintoaccountthescarcityoffunds,thesupporttothisActionaimsatoptimisingtheeffectivenessofTEN-Tfunding.

TThepurposeoftheAction istoestablishanoperational level2ETCSrailwayontheLangaa(exclusive)-Frederikshavn(inclusive)line.PartofTEN-Tnetwork,itisalsoanEarlyDeploymentLine(EDL)intheroll-outofETCSlevel2inwestern

Denmark.Itisamixofdoubleandsingletrackwithmixedtraffic,butmainlypassengertrains.TheActioncoversatotalre-newalofallsignallingsysteminstallationsonthelineandincludesgenericdesignactivitiesforthenewETCSbasedrailwayandengineering,production,installationandtesting.ItisalsopartoftheGlobalProject“SignallingProgramme”,oneofthefirstEuropeanprojectstoimplementETCSBaseline3.

Early deployment of ERTMS Baseline 3 in Denmark

2012-DK-60002-P

ERTMS Member States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested fundingTotal eligible costs €117,967,095

TEN-T requested funding: €58,983,547

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €40,000,000

TEN-T recommended funding: €20,000,000

TEN-T funding: 50%

Evaluation remarks

45

The proposed Action has a high relevance to the call for proposals and impact due to the number of RailwayUndertakingsinvolvedandthelargenumberofvehiclestobeequippedwithERTMS.ThematurityoftheproposedActionissatisfactoryanditsoverallqualityisgood.

The proposal concerns deployment of ERTMS level 2 (fitment and retrofitment) of 341 vehicles owned by 14 railway undertakings in Sweden. It is a part of a Global Project that covers ERTMS onboard and track-side deployment in the coun-

try, which counts an estimated 800-1200 vehicles subject to ERTMS deployment.

2012-EU-60020-P

Deployment of ERTMS onboardequipment in Sweden 2012-2015

ERTMSMember States involved:Sweden, United Kingdom

Applicant:Trafikverket

Requested fundingTotal eligible costs €90,090,000

TEN-T requested funding: €30,325,000

TEN-T funding: 33.66%

Recommended fundingTotal eligible costs: €24,350,000

TEN-T recommended funding: €8,198,000

TEN-T funding: 33.67%

Evaluation remarks

46

TheproposedActionisoverallrelevanttothecallforproposals.Itdemonstratesanexcellentmaturityandverygoodimpact.AnumberofactivitieshavealreadystartedandtheoverallresultsofthecompletedActionwillbebeneficialforthemaintenanceandimprovementofERTMSspecificationsaswellasfortheimplementationofseveralpartsoftheMemorandumofUnderstandingsignedbythesectorinApril2012.ThequalityoftheproposedActionisgood.

The proposal concerns a number of activities supporting the implementation of the third Memorandum of Understanding (MoU of 16 April 2012) signed between the European Commission and the European rail associations in the field of ERTMS.

Successful implementation of the MoU provisions forms a Global Project. The study/development activities covered by the Action aim at standardisation of ERTMS specifications and facilitation of the related processes (e.g. authorisation of ERTMS equipped vehicles and track-side).

Facilitating and speeding up ERTMS - 2nd phase

2012-EU-60022-S

ERTMS Member States involved:Belgium, Germany, Spain, Finland, France,

Applicant:EEIG ERTMS Users Group

Requested fundingTotal eligible costs €15,083,000

TEN-T requested funding: €7,541,500

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €6,346,000

TEN-T recommended funding: €3,173,000

TEN-T funding: 50%

Evaluation remarks

47

TheproposedAction is very relevant to the call for proposalsas it concerns the retrofitmentwithEuropeanTrainControlSystem(ETCS),Baseline2of13freightlocomotives.TheproposedActionismatureandreadytostartfromthetechnicalpointofview.Itwillhaveagoodimpactintermsofsafetyandinteroperability.Thequalityisgood.

The action concerns the retrofitment with ETCS Baseline 2 of 13 freight locomotives. The locomotives belong to four private railway undertakings from Austria and Slovenia. Once retrofitted, the locomotives will operate on the ERTMS (level 1 and

2) lines of Austria, Germany, Hungary, Slovenia, Czech Republic, Slovakia and Switzerland.

2012-EU-60033-P

CEE goes ECTS

ERTMSMember States involved:Austria, Slovenia

Applicant:CargoServ Gmbh

Requested fundingTotal eligible costs €5,303,069

TEN-T requested funding: €1,659,570

TEN-T funding: 31.29%

Recommended fundingTotal eligible costs: €5,303,000

TEN-T recommended funding: €1,659,000

TEN-T funding: 31.28%

Evaluation remarks

48

TheproposedAction’soverallrelevance isgoodas itrelatestothedeploymentofERTMSalongtheItalianrailwaysystem.Ithasalreadystartedandisthereforeconsideredasverymature.TheproposedActionwillhaveagoodimpactoninteroperability.Thequalityisalsogood.

The Global Project concerns the deployment of ERTMS on the Italian railway network. The proposed Action entails off-site and field tests to support the migration from the existing national signalling system (SCMT - Sistema Controllo Marcia

Treno), towards ERTMS/ETCS interoperable solutions.

Off-site and field testing to support Italian ERTMS migration strategy

2012-IT-60009-P

ERTMS Member States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €6,000,000

TEN-T requested funding: €3,000,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €4,822,000

TEN-T recommended funding: €2,411,000

TEN-T funding: 50%

Evaluation remarks

49

TheproposedAction ishighlyrelevanttothecallforproposalsas itconcernstheon-boarddeploymentofERTMS.Thematurityoftheproposalisadequate.Itwillhaveaverygoodimpactintermsofsafetyandinteroperability.Theproposal’squalityisgood.

The Global Project addresses the fitment of 50 train sets ETR 1000 (high speed trains) with ETCS baseline 2, release 2.3.0d. The proposed Action concerns the fitting of 12 train sets ETR 1000 with ETCS baseline 2, release 2.3.0d.

2012-IT-60012-P

Equipment of ETR 1000 trainsets with ETCS Baseline 2 release 2.3.0d

ERTMSMember States involved:Italy

Applicant:Trenitalia S.p.A.

Requested fundingTotal eligible costs €5,355,000

TEN-T requested funding: €2,677,500

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €2,858,000

TEN-T recommended funding: €1,429,000

TEN-T funding: 50%

Evaluation remarks

50

TheproposedAction ishighlyrelevanttothecall forproposalsas itconcernsthetracksidedeploymentofERTMS.Thematurityoftheproposalisadequate.Itwillhaveaverygoodimpactintermsofsafetyandinteroperability.Theproposal’squalityisgood.

TheGlobalProjectaddressestheERTMtracksidedeploymentalongtheTorino-Napolihighspeedline.TheproposedActionisaimedatupgradingtheERTMS/ETCStracksidesystemofthe230kmlongRoma-Napolisectionto2.3.0dspecification.

Upgrade of Roma-Napoli high speed line in order to ensure compatibility

with ERTMS baseline 2.3.0d2012-IT-60018-P

ERTMS Member States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €6,000,000

TEN-T requested funding: €3,000,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €6,000,000

TEN-T recommended funding: €3,000,000

TEN-T funding: 50%

Evaluation remarks

51

TheproposedActionishighlyrelevantandfullymeetstheobjectivesofthecallforproposals.Itisverymatureandsomeofitsactivitiesarealreadyongoing.ThemainstrengthoftheproposedActionisitsimpactasitwillcontributetoimproveinteroperabilityanddecreasetheriskofaccidentsontheconcernedline.Thequalityoftheproposalisgood.

TheproposedActionispartoftheGlobalProjectwhichistheconnectionoftherailwayinfrastructureinMaasvlakte2(ex-tensioninthePortofRotterdam)withthemainrailwayinfrastructureHoofdspoorweginfrastructuurandtheBetuweLine

(PriorityProject5).TheActionincludesdeploymentofERTMSlevel1FullSupervisionmodeonthenewrailinfrastructureonMaasvlakte2withETCSBaseline2Release2.3.0d.

2012-NL-60005-P

Maasvlakte 2 ERTMS

ERTMSMember States involved:The Netherlands

Applicant:Port of Rotterdam

Requested fundingTotal eligible costs €11,089,839

TEN-T requested funding: €5,544,919

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €1,800,000

TEN-T recommended funding: €900,000

TEN-T funding: 50%

Evaluation remarks

52

TheproposedAction’soverallrelevanceisgood,however,someactivitiesdonotfullymatchthecriteriaidentifiedinthecallforproposals.ItisverymatureasnecessarypreparatorystepsareabouttobecompletedandtheActionisreadytostartfromatechnicalpointofview.Intermsofimpact,theproposedActionisexpectedtoincreaseinteroperabilityoftherollingstockandthusthecompetitivenessoftherailtransport.Itwillfacilitatemodalshifttorail.Thequalityoftheproposalisgood.

The proposed action is part of the Global Project with the aim to create an interoperable fleet of Mitsui Rail Capital Europe locomotives for the use on ERTMS corridors A, B, C and E. The Action includes the following activities:

•Prototypingandupgradeof84SiemensES64F4MSlocomotivesforETCSL1/L2linesinAustria,Switzerland,BelgiumandtheNetherlands.

•InstallationofETCS230din20newbuildSiemensVectronAC2andMSlocomotivesforETCSlinesinAustria,SwitzerlandandHungary.

•PrototypingofSiemensVectronACandMSlocomotivesforbaseline3.0(AlstomETCSequipment)(upgradebaseline3.0plannedfor>2016)forETCSlinesinAustria,SwitzerlandandHungary.

•PrototypingofSiemensES64U2AC15/25kVlocomotiveforbaseline3.0(SiemensETCSequipment)(upgradebaseline3.0plannedfor>2016)forETCSlinesinAustria,SwitzerlandandHungary.

2012-NL-60006-P

An ETCS baseline 230d and 3.0 program for installation, upgrade and prototyping of various types

electrical freight locomotives for usage on multiple TEN-T freight corridors and conventional networks

ERTMSMember States involved:The Netherlands

Applicant:Mitsui Rail Capital Europe B.V.

Requested fundingTotal eligible costs €44,117,872

TEN-T requested funding: €19,958,936

TEN-T funding: 45.24%

Recommended fundingTotal eligible costs: €2,000,000

TEN-T recommended funding: €1,000,000

TEN-T funding: 50%

Evaluation remarks

53

The proposal aims to upgrade two existing SRS (System Requirement Specification) and pilot lines to a one single stand-ardised Swedish SRS for ERTMS level 2, and to secure the integration between trackside systems provided by different

suppliers as well as between track-side systems and onboard equipment compliant with Baseline (BL) 2.3.0d or BL3. It is a part of Global Project that consists of ERTMS implementation in Sweden.

Intermsofrelevance,theproposedActionaddressesPriority2ofthecallforproposalswithanupgradeoftrack-sideEuropeanTrainControlSystemontwosections.IthassignificantimpactasadecisionmakingtoolforfutureERTMSdeployment.Concerningmaturity,theproposedActionisreadytostartfromthetechnicalpointofview.Thequalityoftheproposalisadequate.

Upgrade to an uniform Swedish system requirement for ERTMS,

Level 22012-SE-60028-S

ERTMSMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €14,581,755

TEN-T requested funding: €7,290,876

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €14,580,000

TEN-T recommended funding: €7,290,000

TEN-T funding: 50%

54

Multi-Annual Call 2012Projects recommended for funding

ITS-EETS

Intelligent Transport SystemsEuropean Electronic Toll Service

Evaluation remarks

55

TheproposedActionisveryrelevantandaddressestheneedofanad-hocEuropeanITSPlatform(EIP)toensureITSharmonisation and consensus-building, evaluation of former ITS deployment projects, dissemination of knowledgeandeventuallyhigh-levelcommunicationbetweenMemberStates, theEuropeanCommissionandstakeholders. ItsmaturityishighandtheproposedActionisreadytostart.Theimpactandqualityaregood.

2012-EU-50005-S

European ITS Platform (EIP)

The European ITS Platform has the potential to play a key role in harmonised European ITS deployment. It will combine resources from all EU actors (European Commission, Member States, public and private road operators) in a joint effort

to ensure the creation of a proper environment for harmonising existing and future ITS services in view of the ITS Directive’s upcoming specifications. The Platform focuses on the cooperation and consensus building between partners and with other stakeholders, evaluation of the impacts at European scale and dissemination of knowledge and experience.

ITS-EETSMember States involved:Italy, Belgium, Cyprus, Germany, Denmark, Greece, Spain, Finland, France, Ireland, Italy, The Netherlands, Portugal, Romania, Sweden, United Kingdom Applicant: Ministero delle Infrastrutture e dei Trasporti (IT)

Requested fundingTotal eligible costs €11,919,950

TEN-T requested funding: €5,959,975

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €2,700,000

TEN-T recommended funding: €1,350,000

TEN-T funding: 50%

Evaluation remarks

56

The proposed Action (REETS TEN) aims to deploy EETS compliant services in a cross-border regional project. It will cover the electronically tolled primary road network of seven Member States (Austria, Denmark, France, Germany, Italy, Poland

and Spain) and Switzerland. It aims to kick start the actual deployment of EETS, taking into account the perspective of full European coverage. The proposed Action has two main phases:

•Analysisof contractual, proceduraland technical topics, inorder todevelop recommendationsandsolutions that canfacilitatetheintroductionofEETS.

•DeploymentofanopeninformationplatformthatcoversalltheparticipatingcountriesandapilotdemonstrationofEETScompliantservicescoveringaselectionofthesupportingcountries.

2012-EU-50009-S

Regional European Electronic Toll Service (REETS TEN)

TheproposedActionisveryrelevanttothecallforproposalsandtakesaccurateaccountoftherequirementsofthepolicycontextanddeploymentframework.ItismatureandreadytostartanditsexpectedimpactwillbeenhancedthroughthecommitmentofallstakeholderstousetheframeworkforcooperationindeliveringEETScompliantserv-icesinthenextphaseoftestingandimplementationofEETS.Thequalityisgood.

ITS-EETS Member States involved:Austria, Belgium, Germany, Denmark, Spain, France, Italy, Poland

Applicant:Autobahnen- und Schnellstraßen-Finan-zierungs-Aktiengesellschaft (ASFINAG)

Requested fundingTotal eligible costs €5,244,605

TEN-T requested funding: €2,622,302.50

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €4,470,000

TEN-T recommended funding: €2,235,000

TEN-T funding: 50%

57

Multi-Annual Call 2012Projects recommended for funding

MoS

Motorways of the Sea

Evaluation remarks

58

ThemostsignificantpartoftheproposedActionisrelevanttothecallforproposalsandconcenrstheintroductionofLNGintheareaofMoS.TheActionisreadytostart.Thequalityandimpactoftheproposalaregood.

The European market for LNG fuel is very small and immature, with no facility for the small-scale supply of LNG. To solve the “chicken/egg situation”, in which the market is waiting for the ports to create the infrastructure and the ports, in turn,

are waiting for the market, this Action aims to take the first step by creating a break bulk infrastructure for small-scale LNG supply in the Ports of Rotterdam and Gothenburg.

The project consists of two components: the LNG break bulk facility at the Port of Rotterdam adjacent to the Gate terminal and the small-scale satellite terminal in Skarvikshamnen, Gothenburg. The Action will be implemented by a consortium of LNG Break Bulk Rotterdam C.V. (a joint venture of Vopak LNG Holding B.V. and N.V. Nederlandse Gasunie), Vopak LNG Holding B.V. and Swedegas as terminal and infrastructural operators, as well as the Ports of Rotterdam and Gothenburg.

2012-EU-21003-P • Part of Priority Project 21

LNG Rotterdam Gothenburg

MoSMember States involved:The Netherlands, Sweden

Applicant:LNG Break Bulk Rotterdam CV

Requested fundingTotal eligible costs €184,008,970

TEN-T requested funding: €36,801,794

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €171,364,000

TEN-T recommended funding: €34,272,000

TEN-T funding: 20%

Evaluation remarks

59

TheproposedActionisrelevanttothecallforproposalsasitconcernsintroductionofLNGintheareaofMoS.TheActionismatureandisexpectedtobeusefulasadecisionmakingtoolandabestpractice.Thequalityoftheproposalisgood.

This Action is composed of studies that aim at determining the feasibility of implementing LNG bunkering facilities in the Port of Roscoff (northwestern France) and the Port of Santander (northern Spain). They take into account the conform-

ity of the infrastructures and equipment with the standards for risk prevention (Seveso Directive), environmental protection and the eventual constraints, revealed by the impact assessments and the public inquiries. The findings of these studies will be essential to Brittany Ferries in order to decide about the construction of new or retrofitted LNG vessels and for port authorities in Roscoff and Santander for decisions regarding the development of LNG bunkering infrastructures.

2012-EU-21006-S • Part of Priority Project 21

SEAGAS

MoSMember States involved:France, Spain

Applicant:B.A.I.Bretagne Angleterre Irlande SA (Brittany Ferries)

Requested fundingTotal eligible costs €2,082,644

TEN-T requested funding: €1,225,321

TEN-T funding: 58.83%

Recommended fundingTotal eligible costs: €2,082,000

TEN-T recommended funding: €1,041,000

TEN-T funding: 50%

Evaluation remarks

60

TheproposedAction is relevant to thecall forproposals in theareaofMoS. Its impactandqualityaregood.ThematurityisverygoodastheActionisreadytostart.

MONALISA 2.0 aims at contributing to a continuous improvement and development of efficient, safe and environmentally friendly maritime transport in the EU by implementation of a series of measures which are also included or are in line

with the EU’s transport policies and are highly relevant with regard to the development of Motorways of the Sea.

The scope of the Action includes:

•Testingofconcreteapplicationsandserviceswhichwouldallowshort-termcommercialdeployment•Takingjointprivate-publicactiontoelaboratebetterstandardsforrouteexchangethroughacommoninterfaceanddataformat

•Demonstratingconcreteservicesusingnewtechnologytoenhancemaritimesafety,makingsearchandrescueandmass-evacuationsmoreefficientthantodayandbyaddressingportsafety

•TransferringtheresultsofpreviousEUinvestmentsinairtrafficmanagementandothersectorsintothemaritimesector

2012-EU-21007-S • Part of Priority Project 21

MONALISA 2.0

MoSMember States involved:Sweden, Germany, Denmark, Greece, Spain, Finland, Italy, Malta, United Kingdom

Applicant:Swedish Maritime Administration

Requested fundingTotal eligible costs €24,316,096

TEN-T requested funding: €12,158,048

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €24,316,000

TEN-T recommended funding: €12,158,000

TEN-T funding: 50%

Evaluation remarks

61

TheproposedAction isrelevanttotheMoScallofproposalsasawiderbenefitactionfacilitatingnavigation in icerestrictedwaters. Itsmaturity is goodandall necessary support has been provided. TheActionwill have positiveimpactsonthecohesionintheregionconcerned.Thequalityoftheproposalisgood.

WINMOS is an action aiming to further develop efficient maritime transport during winter when sea ice covers large parts of the EU’s northernmost waters.

The Action will develop and adapt the winter navigation system for the benefit of all stakeholders involved in trade and maritime transport in the Baltic Sea area. It includes further cooperation between ice breaking authorities, resource planning, as well as upgrading and renewal of the necessary icebreaking resources.

2012-EU-21008-S • Part of Priority Project 21

Winter Navigation Motorways of the Sea, WINMOS

MoSMember States involved:Sweden, Estonia, Finland

Applicant:Swedish Maritime Administration

Requested fundingTotal eligible costs €142,330,507

TEN-T requested funding: €29,677,770

TEN-T funding: 20.85%

Recommended fundingTotal eligible costs: €142,326,657

TEN-T recommended funding: €29,677,000

TEN-T funding: 20.85%

Evaluation remarks

62

TheproposedActionisoverallrelevanttothecallforproposals.Itismatureandhasalreadystarted.ItwillhaveapositiveimpactatregionalandEUlevels.ThequalityoftheproposedActionisgood.

The proposed Action is part of a Global Project aiming to implement efficient and economically viable solutions to meet the stricter sulphur legislation in 2015 in the Sulphur Emission Control Area (SECA) and support the development of a strong,

competitive, and environmentally sustainable shipping sector in the Baltic Sea. The Action is composed of works, aiming at implementing an LNG bunker supply infrastructure for the Port of Brofjorden, Lysekil, on the west coast of Sweden. It also includes technical studies, whose goal is to deploy new LNG technologies in full scale pilot actions (studies) in commercial vessels operating in the Baltic and North Seas.

It will establish a complete LNG supply and transport infrastructure including all components required to ship LNG from the supplier to the LNG terminal, from terminal to bunker vessel, and from bunker vessel to the LNG fuelled vessels.

2012-EU-21009-P • Part of Priority Project 21

Pilot: LNG bunkering infrastructure solu-tion and pilot actions for ships operating

on the Motorway of the Baltic Sea

MoSMember States involved:Sweden, France, The Netherlands, United Kingdom

Applicant:SSPA Sweden AB

Requested fundingTotal eligible costs €76,059,772

TEN-T requested funding: €23,103,387

TEN-T funding: 30.38%

Recommended fundingTotal eligible costs: €76,059,000

TEN-T recommended funding: €23,103,000

TEN-T funding: 30.38%

Evaluation remarks

63

TheproposedActionisrelevanttothecallforproposalsasapilotactionofanewtypeoflightweightscrubber.Thematurityisgoodandbackedupbythenecessarycommitments.ItwillhavepositiveimpactonthereductionofshippingemissionsintheNorthandBalticseas.TheproposedActionisofsoundquality.

The proposed pilot Action, aims at installing, evaluating and demonstrating a new generation of innovative lightweight scrubber technology in full scale on two existing ro-ro vessels, operating in the Baltic and North Seas, as well as verifying

and evaluating the specific port infrastructure and preparatory investments needed for a full scale implementation of this technology.

The project is part of a Global Project, whose goal is to find efficient and economically viable solutions to meet the stricter sulphur legislation in 2015 in the Sulphur Emission Control Area (SECA) and support the development of a strong, competitive, and environmentally sustainable shipping sector in the Baltic Sea.

It aims to apply a holistic approach of the transport chain and include all aspects and stakeholders involved, such as port representatives, as well as regulative authorities and industrial organisations.

2012-EU-21010-S • Part of Priority Project 21

PILOT SCRUBBER – new generation light-weight pilot scrubber solution installed on a ro-ro ship operating on the Motorway of the

Baltic Sea

MoSMember States involved:Sweden, Finland, The Netherlands

Applicant:SSPA Sweden AB

Requested fundingTotal eligible costs €13,583,650

TEN-T requested funding: €6,791,824

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €13,583,000

TEN-T recommended funding: €6,791,000

TEN-T funding: 50%

Evaluation remarks

64

TheproposedActionishighlyrelevanttothecallforproposalsandTEN-Tprioritiesbyimprovingtheefficiencyofanimportantmaritimelink.Itsmaturityisverygoodasmostpreliminarystepshavebeenfulfilled.TheproposedActiondemonstratesconsiderablepostiveimpacts,particularlyatregionallevelbutalsoatEUlevel.Itisofverygoodqualityinallaspects.

The Global Project is an upgrade of an existing maritime link between Finland and Estonia, an important link with direct connections to Priority Project 12 (Nordic Triangle railway/road axis) and Priority Project 27 (“Rail Baltica” axis: Warszawa-

Kaunas-Riga-Tallinn-Helsinki). The first part of the project is to upgrade a transport link through the proposed Action, linking to the PPs and existing transport networks, as well as to establish a long-term sustainable multimodal transport link.

Results and observations of studies have shown:

•During2002–2010,therewasasignificantincreaseinseabornecargotrafficbetweenFinlandandEstonia.•ThegrowthofcargovolumeontheHelsinki-Tallinnrouteisestimatedtocontinueontheannuallevelof10%duringthenextcoupleofyears.

•WhentheIMO’ssulphurregulationswillcomeintoforce,theHelsinki-TallinnroutewillbecomeamainroutetoWesternEuropeanmarkets.

•Thero/paxconceptisseenastheonlyeconomicalprofitablesolutionontheHelsinki-Tallinnroute.

2012-EU-21011-P • Part of Priority Project 21

TWIN-PORT

MoSMember States involved:Finland, Estonia

Applicant:Port of Helsinki

Requested fundingTotal eligible costs €56,300,000

TEN-T requested funding: €11,260,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €56,300,000

TEN-T recommended funding: €11,260,000

TEN-T funding: 20%

Evaluation remarks

65

TheproposedAction isvery relevant to thecall forproposalsasaimsatupgradingamaritime link in this region.Itsmaturity isguaranteed throughnecessary supportprovided,aswell as the current implementation status. TheproposedActionwillhaveconsiderableimpactontheeconomicstimulationintheregionconcernedandwillimprovetheenvironmentalperformanceoftheconnectionandtheaccessibilityofthisperipheralregion.ThequalityoftheproposedActionissatisfactory.

The Action aims at upgrading the transport link between northern Sweden and western Finland, including land and water-borne transport systems. It includes designing, constructing and improving the transport link through new transport pat-

terns, multimodal logistics and cost efficient solutions. The Action includes:

•Works:infrastructureinvestmentsmadebothcountriesinordertoimproveportlogistics,railconnectionsandportinter-modality.

•Capitalcosts:start-upaidforatemporaryferry,includingthenecessaryupgradingandadjustmentsmadeandplannedforthistemporarysolution.Theupgradingandadjustmentswillbeusedasexamplesduringtheanalysesandconceptdevelopment.

•Studies:whichincludeananalysisoftrafficmanagementandorganizationalaspectsofthetransportlink,aswellasthedevelopmentofatransportconcepttomeettheneedsandprovideagoodfoundationasinputforthedetaileddesignorprocurementofaferry.

2012-EU-21013-S • Part of Priority Project 21

Kvarken multimodal link - midway alignment of the Bothnian Corridor

MoSMember States involved:Sweden, Finland

Applicant:NLC Ferry Ab Oy

Requested fundingTotal eligible costs €23,609,015

TEN-T requested funding: €8,506,768

TEN-T funding: 36.03%

Recommended fundingTotal eligible costs: €20,734,000

TEN-T recommended funding: €6,129,000

TEN-T funding: 29.56%

Evaluation remarks

66

TheproposedActionisveryrelevanttothecallforproposalsasapilotactiontestingmethanolasanalternativefuelonships.Thematurityisveryhigh.TheproposedActionwillhavesignificantimpactsonimprovingtheenvironmentalperformanceofshipping.Thequalityisverygoodwithwelldefinedobjectivesandcorrespondingactivities.

The Action proposes the use of methanol as a pragmatic, cost-effective and environmentally friendly solution to the maritime industry’s challenges to comply with the ambitious International Maritime Organisation and EU emission reduc-

tion targets.

The project, which takes the form of a pilot Action, mainly involves the installation and testing of methanol on an existing passenger vessel and short sea route between Gothenburg and Kiel. In addition to retrofitting the vessel, the study will also create the appropriate port infrastructure for the supply of methanol for bunkering: a bunker vessel and a storage tank will be built to carry methanol, as well as the corresponding facilities in both ports.

2012-EU-21017-S • Part of Priority Project 21

Methanol: The marine fuel of the future

MoSMember States involved:Germany, Finland, Sweden

Applicant:Stena Aktiebolag

Requested fundingTotal eligible costs €22,502,000

TEN-T requested funding: €11,251,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €22,502,000

TEN-T recommended funding: €11,251,000

TEN-T funding: 50%

Evaluation remarks

67

The proposed Action is highly relevant to the call for proposals and fits the priorities as a wider benefit actioncontributingtothedevelopmentofe-maritimesolutionsandestablishmentofsinglewindows.TheproposedActionisconsideredverymatureatalllevels,whichisensuredbydirectparticipationof13MemberStates.Itwillhavesignifi-cantimpactonstandardisingandharmonisingreportingproceduresinshippingviaasystemofsinglewindows.Thequalityishighandallkeyelementsareinplace.

ANNA is an EU Member State driven project/pilot action addressing the wider benefit for MoS operations. The aim is to assist participating national administrations, the EC and EMSA to enable the effective implementation of EC Direc-

tive 2010/65/EU (Reporting Formalities for Ships arriving in/departing from EU ports) in time. ANNA also supports (system) integration of national maritime single window development (ship-to-shore and between the various services/administra-tions) to allow for effective and sustainable communication between the national systems, including SafeSeaNet (SSN). The ANNA consortium consists of 13 EU Member States and is supported by nine countries, the World Customs Organisation and eight stakeholder organisations.

2012-EU-21019-S • Part of Priority Project 21

ANNA - Advanced National Networks for Administrations

MoSMember States involved:Belgium, Bulgaria, France, Greece, Italy, Latvia, Portugal, Romania, Slovenia, Spain, Sweden, The Netherlands, United Kingdom

Applicant:Dutch Ministry of Infrastructure and the Environment

Requested fundingTotal eligible costs €37,076,437

TEN-T requested funding: €18,538,219

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €37,076,000

TEN-T recommended funding: €18,538,000

TEN-T funding: 50%

Evaluation remarks

68

TheproposedActionishighlyrelevanttothecallforproposalsasapilotactionovercomingICTobstaclesinprovidingseamlesstransportoperationsinthemultimodalsupplychain,includingITsolutionsfortheimplementationoftheEUDirective2010/65.TheproposedActionisverymatureandbuildsontheexperienceandusefulresultsofpreviouslyMoS4MosAction.Itsimpactisgood.ThequalityoftheproposedActionisgood.

The B2MoS Action is an innovative study/pilot actions aiming at improving the information exchange between public and private organisations and promoting their operational cooperation to increase the efficiency of MoS. It hopes to boost the

development of a TEN-T Motorways of the Sea network and improve European cohesion by simplifying specific administrative procedures affecting ultra-peripheral and peripheral regions and reducing barriers to intra-EU trade.

The project will contribute to establishing a European maritime space without barriers by facilitating and simplifying compliance with regulations and by promoting intermodal sustainable transport solutions that reinforce the MoS strategy. The prototypes will be piloted by public entities, port communities and MoS business stakeholders offering road, rail, inland navigation and maritime services in MoS services connecting Germany, United Kingdom, Spain, Italy, Slovenia and Greece.

2012-EU-21020-S • Part of Priority Project 21

Business to Motorways of the Sea

MoSMember States involved:Germany, Greece, Italy, Slovenia, Spain, United Kingdom

Applicant:Fundacion de la Comunidad Valenciana para la In-vestigacion, Promocion y Estudios Comerciales de Valenciaport

Requested fundingTotal eligible costs €11,394,970

TEN-T requested funding: €5,697,485

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €11,394,000

TEN-T recommended funding: €5,697,000

TEN-T funding: 50%

Evaluation remarks

69

TheproposedActionisrelevanttothecallforproposalsintermsofintegrationoftheconceptinawidercorridorframe-workofthenewTEN-Tguidelines.Itisverymatureandreadytostart.IthasapositiveimpactasfarasitscontributiontothedecisionandpolicymakingatEUlevelinrelationtotheindividualproposedcorridors.Itsqualityisgood.

In the new TEN-T Guidelines, Motorways of the Sea remain the maritime dimension of the TEN-T network. By improving maritime, ports and logistics operations, MoS will allow the development of the underlying skeleton of the new multimodal

core network corridors. As an operative and policy supporting framework, WiderMos will improve the interoperability between maritime/other transport modes (mainly rail) by developing new port/ship/train interfaces and will help kick off the analysis of how MoS will be linked to the governance model of the TEN-T priority corridors. This will be realised through:

•Fivepilotprojects,demonstratingtheeffectivenessofabetterstructuredinteroperabilitybetweenmodes•Apolicysupportingactivitydefiningthemedium-termprospectiveoptionsforMoSin2020•AdeeperanalysisoffourveryspecifictopicsconcerningtheroleofMoSinthedevelopmentoftheTEN-Tcorridorsgov-ernancemodel

WiderMoS

2012-EU-21021-S • Part of Priority Project 21

MoSMember States involved:Germany, Italy, Portugal, Spain

Applicant:Autorità Portuale della Spezia

Requested fundingTotal eligible costs €5,940,398

TEN-T requested funding: €2,970,199

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €5,940,000

TEN-T recommended funding: €2,970,000

TEN-T funding: 50%

Evaluation remarks

70

TheproposedActionisveryrelevanttothecallforproposalsandaimsatdeployinganewpropulsionsystemforves-sels.Thematurityhasbeenwelldemonstrated. Itwillhaveusefulenvironmental impact for theNorthernSulphurEmissionControlArea.Ithasanoverallgoodquality.

The project, a pilot Action, aims at optimizing bunker consumption and reduction of exhaust gas emissions, through the use of an innovative system of ESS batteries (Energy Storage System) for hybrid propulsion and the installation of

wet-scrubber technology on four similar ro/pax ships, serving the high frequency maritime route between the Ports of Puttgarden (DE) and Rødby (DK). The Action will be implemented by a consortium composed of two branches of the same holding company (Scandlines).

2012-EU-21023-S • Part of Priority Project 21

Sustainable Traffic Machines - On the way to greener shipping

MoSMember States involved:Denmark, Germany

Applicant:Scandlines Deutschland GmbH

Requested fundingTotal eligible costs €25,303,950

TEN-T requested funding: €12,651,975

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €12,917,000

TEN-T recommended funding: €6,458,000

TEN-T funding: 50%

71

Multi-Annual Call 2012Projects recommended for funding

RIS

River Information Services

Evaluation remarks

72

The Action is very relevant to the call for proposals as it aims to upgrade RIS technology, systems and serviceapplications.TheActionisverymatureandwillleadtopositiveoutcomeintermsofimprovingtheeconomicefficiencyandsafetyofinlandnavigation.ThequalityoftheproposedActionisexcellent.

ThisActionfollowsfromthreepreviousRISTEN-Tfundedprojects(2008-BE-30000-P,2010-BE-70202,2011-BE-70001)andaimstoextendtherangeofavailableRISservicesandapplicationsinFlanders.ItfocusesontheconnectionofRIS

applicationstothe‘backbonestructure’ofRISFlandersdevelopedpreviously,aswellasmakingRISinformationavailabletoawiderpublic.TheobjectiveistoprovideFlanderswithamorerobustandup-to-dateRISsystemandshareinformationwithotherinterestedstakeholderssuchaslogistics,safetyandsecurityoperators.

2012-BE-70001-P

Implementation of RIS in Flanders IV

RISMember States involved:Belgium

Applicant:Flemish Government

Requested funding

Total eligible costs €2,940,000

TEN-T requested funding: €588,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €2,940,000

TEN-T recommended funding: €588,000

TEN-T funding: 20%

Evaluation remarks

73

TheproposedActionishighlyrelevanttothecallforproposalsasitaimsatfurtherimprovingtheriverinformationservicesavailableinaverybusyarea.TheproposedActionismatureandreadytostart.Itisexpectedtohaveapositiveimpactintermsofimprovedsafety,reliabilityandefficiencyofnavigation.OveralltheproposedAction’squalityisgood.

ThisActionisthethirdphaseofexistingRISTEN-Tfundedprojects(2008-EU-30001-Pand2011-EU-70003-P),aimingatenhancingthesafetyandefficiencyofinlandwaterwaytransportontheWesterscheldtriver—namelyimprovingthe

exchange of information, replacing the backbone of the information processing system of the Scheldt Radar Network,enablingtheuseofmoderncommunicationtools(RISapplicationsforsmartphones,tablets,applications),implementingthecalamityabatementsupportandimprovingoperationalplanningontheGent-TerneuzenCanal.

2012-EU-70002-P

Implementation of RIS on the Westerscheldt River III

RISMember States involved:Belgium, The Netherlands

Applicant:Flemish Government

Requested funding

Total eligible costs €2,375,000

TEN-T requested funding: €475,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €2,375,000

TEN-T recommended funding: €475,000

TEN-T funding: 20%

Evaluation remarks

74

TheproposedActionisextremelyrelevanttothecallforproposalsasitaimstofacilitatethedefinitionandimplemen-tationofaRIScorridorapproachandstrengthenthepositionofinlandnavigationinthemulti-modaltransportchain.Itismature.TheoveralimpactisverypositiveandtheproposedActionwillserveasausefuldecision-makingandpolicytoolforcorridormanagementattheEuropeanlevel.Thequalityisgood.

ThisstudyaimsatdevelopingthedefinitionandimplementationofaRIScorridorapproachtostrengtheninlandnavigationwithinthetransportchain.TheActionwillfacilitatetheestablishmentofastructureddialoguebetweenpublicandprivate

stakeholdersacrossnationalborders.Inaddition,itwillinvestigatehowtofosterinteroperabilityandcompatibilitybetweentheseveraltechnologiesdeployed.Theproject’sactivitiesinthecontextoftheGlobalProjectwillfocusonthedeploymentofintelligentinfrastructuretoenabletheefficientRISimplementationatcorridorlevel.

2012-EU-70004-S

RIS Enabled European IWT Corridor Management

RISMember States involved:The Netherlands, Austria, Belgium, Germany, Luxembourg

Applicant:Ministerie van Infrastructuur en Milieu

Requested funding

Total eligible costs €2,814,000

TEN-T requested funding: €1,407,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €2,814,000

TEN-T recommended funding: €1,407,000

TEN-T funding: 50%

Evaluation remarks

75

TheproposedActionishighlyrelevanttothecallforproposalsasitaimstodevelopariverinformationsystemadaptedtotheneedsoftheareaconcerned.Itismature.Itwillcontributetoincreasingthequalityandsafetyofnavigationintheregion.Thequalityisgenerallygood.

TheActionaimsatdevelopingariverinformationsystemadaptedtotheneedsoftheUpperRhineinFrance.Themainobjectiveofthisstudyistobuildontheoutputsdeliveredwithintheframeworkofpreviousprojectsandtoplananinland

waterwaytrafficmanagementsystemfortheUpperRhine.TheActionwillfirstidentifyuserneedsandthenimplementadataexchangesystem.Theprojectaimstoincreasewaterwaytransportcompetitiveness,reinforcesafety,upgradetrafficmanagementandreduceCO2emissions,aswellasplayanimportantroleinfosteringmodalshift.

2012-FR-70003-S

RIS Upper Rhine

RISMember States involved:France

Applicant:Ministère de l’écologie, du Développement durable et de l’énergie

Requested funding

Total eligible costs €1,936,200

TEN-T requested funding: €968,100

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €1,936,000

TEN-T recommended funding: €968,000

TEN-T funding: 50%

76

Multi-Annual Call 2012Projects recommended for funding

PPs

Priority Projects:New Actions

Evaluation remarks

77

TheproposedActionisofhighrelevancesinceitaddressestheobjectivesandprioritiesoftheCallforProposalsnamelyitispartofPriorityProject17andisexpectedtoremoveacapacitybottleneck.TheActionhasreceivedallapprovalsnecessarytocommencetheimplementation;itisthereforeverymature.Itssocio-economicimpactishighasitwillestablishacompetitivetrans-Europeannetwork,providinghighqualityoffreightandpassengerservice.Theproposalisofverygoodquality.

The proposed construction of the St Pölten freight train bypass complements previous measures to complete the Global Project (Priority Project 17) on the Munich-Bratislava sub-section. It aims to remove an identified bottleneck by increasing

the capacity to four tracks, together with the high speed passenger line through St Pölten. To achieve the scheduled operation of the bypass by 2017, two works are still needed: Pummersdorfer tunnel and the western connection.

This Action involves the construction of the connection to the west of the new St Pölten freight train bypass and works to connect the Rohr and Wagram nodes.

2012-AT-17002-P • Part of Priority Project 17

St Pölten freight train bypass, connection to the west

PPs - New ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested funding

Total eligible costs €66,391,360

TEN-T requested funding: €13,278,272

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €66,385,000

TEN-T recommended funding: €13,277,000

TEN-T funding: 20%

Evaluation remarks

78

TheproposedActionisofhighrelevancetothecallforproposalssinceitaddressestheremovalofabottleneckonPriorityProject17.TheActionisverymatureasithasreceivedallapprovalsnecessarytocommencetheimplemen-tation.Anex-anteevaluationhasdemonstratedthattheproposedActionwillhavepositivedirectandindirectsocio-economiceffects.Thequalityoftheproposalisverygoodincludingwellthoughtimplementationplans.

The newly to be constructed St. Pölten freight train bypass continues previous measures to complete the Global Project (Priority Project 17) on the Munich-Bratislava sub-section. It aims to remove an identified bottleneck by increasing the

capacity to four tracks, together with the high speed passenger line through St. Pölten. To achieve the scheduled operation of the bypass by 2017, two works are still needed: Pummersdorfer tunnel and the Western connection.

This Action involves the construction of Pummersdorfer tunnel, including the shell construction tunnel, tunnel equipment and non-ballasted track.

2012-AT-17003-P • Part of Priority Project 17

Pummersdorfer Tunnel

PPs - New ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested funding

Total eligible costs €66,982,000

TEN-T requested funding: €13,396,400

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €66,975,000

TEN-T recommended funding: €13,395,000

TEN-T funding: 20%

Evaluation remarks

79

TheproposedActionishighlyrelevanttothecallforproposalsasitaddressesamajorbottleneckonPriorityProject18.TheActionisverymatureasimplementationhasalreadystarted.Itwillgenerateconsiderablesocio-economicbenefitsintermsofimprovedmodalsplitandgrowthofcontainertranshipment.Thequalityoftheproposalisverygood.

TheproposedActionconsistsofworksaimingtoexpandthetrimodalportofFreudenau/Vienna,inordertoincreasetheca-pacityforhandlingadditionalfreight–especiallyinthelightofrecentincreasesofthroughput.Theportisanintersection

forinternationalflowsandtranshipmentbetweeninlandwaterway,railandroadtransport.Theseworksspecificallyconcerntheextensionoftheport’scontainerhandlingcapacitiesthroughlandrecoveryandtheconstructionofanewquaywallinordertooptimisetheareasofoperation.

2012-AT-18070-P • Part of Priority Project 18

Expansion of the tri-modal inland port by land recovery

PPs - New ActionMember States involved:Austria

Applicant:Wiener Hafen, Gmbh & Co KG

Requested funding

Total eligible costs €12,797,477

TEN-T requested funding: €2,559,495.40

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €12,790,000

TEN-T recommended funding: €2,558,000

TEN-T funding: 20%

Evaluation remarks

80

TheproposedActionishighlyrelevanttothecallforproposalsasitaddressesbottlenecksonPriorityProject28withaviewtoimprovingtheconnectiontotheairport.TheActionisverymatureandreadytostartaspreparatorystepshavebeencompleted.Itsimpactiswelldemonstrated.Thequalityoftheproposalishighascompleteandaccurateinformationisprovided.

The Action covers the works at Watermael-Schuman-Josaphat for the period 2012-2015 to eliminate the bottlenecks of Brussels-Schuman-Schaerbeek and the Etterbeek triangle on Priority Project 28 (Eurocaprail on the Brussels-Luxembourg-

Strasbourg railway axis). It will also allow the connection between Priority Project 28 and the new railway infrastructure for Brussels Airport linking Priority Project 28 to Priority Project 2, High-speed railway axis Paris-Bruxelles/Brussel-Köln-Amster-dam-London. The works comprise:

•CivilengineeringworksoftheSchuman-JosaphattunnelanditsconnectiontotheexistingCinquantenairetunnel•AdaptationoftherailwaybaseandsafetymeasuresfortheSchuman-Josaphatlink,includingbuildingadditionalemer-gencyexits

•Extensionworks,finishingandsafetymeasuresfortheSchumanmultimodalhub•ConstructionworkattheL.161crosswithL.161A-trackB(flyover)andrailwayequipmentoftheL.161betweentheWa-termaelandEtterbeekstations

•Installationofenvironmentalmeasures(acousticscreens,anti-vibrationmeasures)

2012-BE-28105-P • Part of Priority Project 28

Watermael Schuman-Josaphat

PPs - New ActionMember States involved:Belgium

Applicant:Infrabel sa

Requested funding

Total eligible costs €194,471,239.18

TEN-T requested funding: €38,894,247.84

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €169,720,000

TEN-T recommended funding: €33,944,000

TEN-T funding: 20%

Evaluation remarks

81

TheproposedActionisveryrelevanttothecallforproposalsasitcontributestoimprovingthemultimodalcapacity.TheActionisverymatureandreadytostartfromthetechnicalpointofview.TheimpactsoftheActionareverypositive.ThequalityoftheproposalisgoodandtheproposedactivitiesarecoherentwiththeobjectiveoftheAction.

TheMělníkinlandportservesdailycontainertrainsfrom/toWesternEuropeanportssuchasRotterdam,BremerhavenandHamburg;aswellasBratislava,BudapestandKoper.TherearebottlenecksinthetransfercapacityinCentralBohemia

andMelnikistheonlyCzechportwiththepotentialforexpansion.TheAction,whichisonPriority Project 22(RailwayaxisAthens-Sofia-Budapest-Wien-Praha-Nürnberg/Dresden)nexttotheElberiveraimstoeliminatebottlenecksandcompletethemainroutesinordertoachieveinteroperabilityoftherailnetwork.

Italsoaimstooptimisethecapacityandefficiencyoftheinfrastructure,sincethethepresentfacilitiesareoutdatedandcannotmatchthecargovolumedevelopment.Specifically,theActionwillincreaserailcapacity,storage,transfercapacityto200,000TEU,andexpandentranceandpositioningareafortrucks.

2012-CZ-22117-P • Part of Priority Project 22

Intermodal terminal Mělník

PPs - New ActionMember States involved:Czech Republic

Applicant:České přístavy, a.s.

Requested funding

Total eligible costs €4,134,648

TEN-T requested funding: €826,929.60

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €4,130,000

TEN-T recommended funding: €826,000

TEN-T funding: 20%

Evaluation remarks

82

The proposed Action is highly relevant to the TEN-T priorities and call for proposals as it will improve modalintegration, will foster sustainable mobility and will facilitate intermodality between Priority Project 17and the Munich airport. The maturity of the proposed Action is very good and there are no pending issuesbefore theAction starts. TheActionwill producesocio-economicbenefits,will improve intermodalityalongPriorityProject17andcontributetomodalshiftfromroadtorailthusreducingCO2emissions.Thequalityoftheproposalisgood.

The proposed Action includes studies and planning to obtain the building permit for the construction of a new railway con-nection from the Munich Airport towards the east (direction of Erding), and farther to Priority Project 17 (Railway axis

Paris-Strasbourg-Stuttgart-Wien-Bratislava).

The objective is to carry out planning phases 1-4 to get the building permits according to the HOAI (German Scale of Fees for Architects and Engineers) for the following sections:

•MunichAirport-Erding•Erding-Walpertskirchen(Walpertskirchener Spange)-componentservices(planning,projectsteeringandaccompanimentbyDBNetzAG,DBStation&Service,DBEnergie,DBProjektbau)

2012-DE-17022-S • Part of Priority Project 17

Planning the construction of a new rail-way connection between Munich Airport and PP17 between Munich and Salzburg

PPs - New ActionMember States involved:Germany

Applicant:Bayerisches Staatsministerium für Wirtschaft, Infrastruktur, Verkehr und Technologie

Requested funding

Total eligible costs €25,000,000

TEN-T requested funding: €12,500,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €25,000,000

TEN-T recommended funding: €12,500,000

TEN-T funding: 50%

Evaluation remarks

83

TheproposedActionishighlyrelevanttothecallforproposalsandTEN-TprioritiesasitaimsatimprovingoperationsonPriorityProject20,establishingkeylinksandinterconnectionsaswellaseliminatingbottlenecks.Itsmaturityisverygoodaskeypreparatorystepshavebeenfulfilled.TheimpactoftheproposedActionisverygood.Thequalityoftheproposalisverygoodincludingcleardescriptionsoftheexpectedresults.

TheproposedActionisastudyforthepreliminaryandfinaldesignphasesfortheconstructionofanewtrackbetweenHamburgandBadOldesloeparalleltotheexistingtrack,includingthepreparationofthenecessaryconstructionpermis-

sionapplications.

The proposed Action covers the southern part of the German access to the Fehmarn Belt Fixed Link and forms part of Priority Project 20.

2012-DE-20012-S • Part of Priority Project 20

Fehmarn Belt-Hinterland Connection: planned activity for unbundling rail traffic at

the Hamburg junction (TEN-T Priority Project 20)

PPs - New ActionMember States involved:Germany

Applicant:Freie und Hansestadt Hamburg, Behörde für Wirtschaft, Verkehr und Innovation

Requested funding

Total eligible costs €29,200,000

TEN-T requested funding: €14,600,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €29,200,000

TEN-T recommended funding: €14,600,000

TEN-T funding: 50%

Evaluation remarks

84

TheproposedActionishighlyrelevanttothecallforproposalsasitaddressesabottleneckonPriorityProject20.Itsmaturityisdemonstratedbythenecessarypoliticalandfinancialcommitments.TheActionisexpectedtoproduceasignificantimpactonlocalplanningandontheGlobalProjectthatwillboosttheeconomyoftheBalticsearegion.Thequalityoftheproposalisverygood.

TheActionconsistsofdetailedplanningphasestudiesofanewhighspeedrailwaybetweenCopenhagenandRingsted,avitalpartofPriorityProject20(RailwayaxisFehmarnBelt)inDenmark.TheexistingmainlinethatrunsfromCopenhagen

toRingstedviaRoskildeisoneofDenmark’smostheavilyusedandstrategicallyimportantroutes.ItisusedbycommutersbetweenCopenhagenandtherestofZealand,aswellasfornationalandinternationalpassengerandfreighttraffic.Theex-istinglineviaRoskildehasbecomeabottleneck.Itwasdecidedin2012thatthebesttechnicalsolutionwasanewdualtracklinefromCopenhagentoRingstedviaKøge,includinganewstationinthenorthernpartofKøge(KøgeNord)andamaximumspeedforpassengertrainsof250km/h.

2012-DK-20010-S • Part of Priority Project 20

New railway line Copenhagen-Ringsted (detailed planning phase): access lines to the future Fehmarn Belt fixed link

PPs - New ActionMember States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested funding

Total eligible costs €61,168,000

TEN-T requested funding: €30,584,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €61,168,000

TEN-T recommended funding: €30,584,000

TEN-T funding: 50%

Evaluation remarks

85

The proposed Action is highly relevant to the call for proposals as it contributes to removing a bottleneck onPriorityProject20.ItsmaturityisexcellentandtheActionisreadytostartasallnecessarypreparatorystepshavebeenfulfilled.ItsimpactisverygoodastheActionisexpectedtofurtherdevelopbestpracticesonintegratingenvironmentalconcernsandclimateadaptationmeasures.Theproposalisofveryhighquality,realisticandconsistent.

TheAction consists of studies for the detailed design phase for the construction the FehmarnBelt railway hinterlandconnectionsinDenmarktoincreasethecapacityoftherailwaysectionbetweenRingstedandRødby.TheActionincludes

projectmanagement,detaileddesignfortheconstructionworks,aswellasitstenderingandawarding.

2012-DK-20013-S • Part of Priority Project 20

Upgrade of the Ringsted-Rødby section (second phase of detailed planning studies): upgrading the railway access lines to the future Fehmarn

Belt fixed link

PPs - New ActionMember States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested funding

Total eligible costs €39,441,586

TEN-T requested funding: €19,720,793

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €39,440,000

TEN-T recommended funding: €19,720,000

TEN-T funding: 50%

Evaluation remarks

86

TheproposedActionishighlyrelevanttothecallforproposalsandtheTEN-TprioritiesasitaddressesabottleneckandcontributestothedevelopmentofinteroperabilityalongPriorityProject27.TheActionisverymatureasitistechni-callyreadytostart.TheproposedActionwillproduceapositiveimpactonthedevelopmentofPriorityProject27.Theproposalisofgoodquality.

TheproposedactionispartoftheGlobalProjectdevelopingtheEuropeangaugerailwaylineinEstoniaaspartofPriorityProject27(“RailBaltica”-Warsaw-Kaunas-Riga-Tallinn-Helsinki).TheActionincludespreparatorystudiescoveringthespatial

planning,preliminarydesignandupdatedfinancialstudiestoachievesufficientmaturitytobeginthedetailedtechnicaldesignandworksprocurement.

2012-EE-27001-S • Part of Priority Project 27

Spatial planning and technical studies for Rail Baltica (Estonian section)

PPs - New ActionMember States involved:Estonia

Applicant:Estonian Technical Surveillance Authority

Requested funding

Total eligible costs €10,257,400

TEN-T requested funding: €5,128,700

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €10,256,000

TEN-T recommended funding: €5,128,000

TEN-T funding: 50%

Evaluation remarks

87

TheproposedActionisrelevanttothecallforproposalsandtheTEN-Tprioritiesasitconcernsthedevelopmentofinterconnections, improvementofsafetyandmobility. Itsmaturity isgoodasallnecessarypreparatorystepshavebeenorareabouttobefulfilled.TheActionisexpectedtoproduceaverygoodimpactonimprovingsafetyandreducingtheroadtrafficload.Thequalityoftheproposalisgood,includingrealisticimplementationplans.

The Action concerns the elaboration of the remaining studies for upgrading the Piraeus-Athens section. Specifi-cally, the Action includes the following studies: surveying, preliminary and final studies, detailed (E/M, architectural

landscape), geotechnical, superstructure, Environmental Impact Study modification (if required), planting works and theelaborationoftenderdocuments.

2012-EL-22023-S • Part of Priority Project 22

Remaining studies for the underground con-struction and rail level realignment of the

railway corridor from the Piraeus RS exit (Km 1+488) to the Athens RS entrance (Km 9+700)

PPs - New ActionMember States involved:Greece

Applicant:ΥΠΟΥΡΓΕΙΟ ΑΝΑΠΤΥΞΗΣ, ΑΝΤΑΓΩΝΙΣΤΙΚΟΤΗΤΑΣ, ΥΠΟΔΟΜΩΝ, ΜΕΤΑΦΟΡΩΝ & ΔΙΚΤΥΩΝ

Requested funding

Total eligible costs €1,500,000

TEN-T requested funding: €750,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €1,500,000

TEN-T recommended funding: €750,000

TEN-T funding: 50%

Evaluation remarks

88

TheproposedAcitonishighlyrelevanttothecallforproposalsasitaimsatimprovinginteroperabilityandaccessibilityaswellasremovingbottlenecksonPriorityProject3.ItsmaturityisdemonstratedastheActionhasalreadystarted.Itsimpactisimportantintermsoffurtherdecisionmakingconcerningtheglobalproject.Thequalityoftheproposalisgood.

TheGlobalProjectconsistsoftheconnectionofthe internationaltrackwidthfromthePortofBarcelonatotheFrenchborderaspartofthehighspeedMadrid-Barcelona-Frenchborderrailline,withinPriorityProject3(Highspeedrailway

axisofsouthwestEurope).TheproposedActioncoversastudyonthenewsouthernroadandrailwayaccesstothePortofBarcelonaandinparticularitsnewPratdock,includingtheTercat-Hutchisoncontainerterminal.

2012-ES-03040-S • Part of Priority Project 3

New southern road and rail access to the Port of Barcelona. Phase 1. Studies.

PPs - New ActionMember States involved:Spain

Applicant:Ministerio de Fomento. Dirección General de Ferrocarriles

Requested funding

Total eligible costs €1,580,400

TEN-T requested funding: €790,200

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €1,580,000

TEN-T recommended funding: €790,000

TEN-T funding: 50%

Evaluation remarks

89

TheproposedActionisveryrelevanttothecallforproposalsasitconcernstheremovalofabottleneckalongPrior-ityProject8.ItsmaturityisverygoodasallprerequisiteshavebeenfulfilledandtheActionisreadytostart.AspartoftheGlobalProject,theActionisexpectedtohaveapositiveimpactonabsorbingtrafficgrowth,increasingnationalcompetitionandsafety.Thequalityoftheproposalisgood,realisticandconsistentfromthetechnicalandfinancialpointofview.

Theproposalconsistsofworksfortheimplementationof25kVelectrification,energyfacilitiesandservicestofollowuptheworksonthe71kmlongMedinadelCampo-Salamancasection,belongingtotheSalamanca-Portugueseborder-Lisbon

conventionalrailwayline,partofPriorityProject8(MultimodalaxisPortugal/Spain-restofEurope).

2012-ES-08113-P • Part of Priority Project 8

Electrical facilities for Medina del Campo-Salamanca section. Railway line Medina del Campo-Salamanca-Fuentes de Oñoro

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested funding

Total eligible costs €28,370,000

TEN-T requested funding: €5,674,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €28,370,000

TEN-T recommended funding: €5,674,000

TEN-T funding: 20%

Evaluation remarks

90

TheproposedAction is relevant to the call forproposalsand theTEN-Tprioritiesas it aimsat improvingexistingcapacityandpromotinginter-modality.Itismatureandreadytostartfromthetechnicalpointofview.Positiveimpactisexpectedonabsorptionoftrafficgrowth,multi-modalsplit,servicequality,safetyandsecurity.Theoverallproposalisofgoodquality,realisticandconsistentfromatechnicalpointofview.

Theproposalconsistsoftrackbedworks,signallingandtelecommunicationsfacilitiesinthesectionPk3,1toPk6,8SanRoqueMercancíasbelongingtotheconventionalBobadilla-Algecirasline,partofPriorityProject16(FreightrailwayaxisSines/

Algeciras-Madrid-Paris).Theworksincludeinter aliathecompleterenovationoftheexistingIberiangaugesingletrackbylay-ingdownpolyvalentsleepers;installationofaCentralisedTrafficControl(CTC)system,constructionofsmallvariantsandrailsidetrack,curvecorrectionsandembankmentstabilisation,reductionofthenumberoflevelcrossingsandthepowersupplytoequipmentandfacilities.

2012-ES-16096-P • Part of Priority Project 16

Track bed works, signalling and telecomuni-cation facilities: Section Pk 3,1 a Pk 6,8. San

Roque Mercancías. Railway line Bobadilla-Algeciras

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested funding

Total eligible costs €14,000,000

TEN-T requested funding: €2,800,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €14,000,000

TEN-T recommended funding: €2,800,000

TEN-T funding: 20%

Evaluation remarks

91

The proposed Action is highly relevant to the call for proposals as it concerns design studies leading to theimplementationofworksonPriorityProject19.Itsmaturityisverygoodasnecessarysupporthasbeenprovidedandallpreparatorystepshavebeenfulfilled.Theimpactishighastheoutcomeofthestudywillbethebasisforphysicalimplementationtostart.Theproposalisofgoodquality.

TheproposalconcernstheplanningandthefinaldesignstudiesfortheimplementationofUICgaugeinthe570kmlongrailsectionbetweentheCastellbisbalHubandMurcia,alongtheMediterraneancorridor,partofPriorityProject19(Highspeed

railinteroperabilityintheIberianPeninsula).Thesectionisplannedwith340kmofdoubletrackand230kmofsingletrack.

2012-ES-19031-S • Part of Priority Project 19

Implementation of the UIC gauge in the Mediterranean Corridor. Phase 1.

Studies.

PPs - New ActionMember States involved:Spain

Applicant:Ministerio de Fomento. Dirección General de Ferrocarriles

Requested funding

Total eligible costs €9,754,900

TEN-T requested funding: €4,877,450

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €9,754,000

TEN-T recommended funding: €4,877,000

TEN-T funding: 50%

Evaluation remarks

92

TheproposedAction ishighlyrelevanttothecallforproposalsas itconcernsdesignstudies leadingtothe imple-mentationofworksonPriorityProject19.Itsmaturityisverygoodasnecessarysupporthasbeenporvidedandallpreparatorystepshavebeenfulfilled. Its impact ishighastheoutcomeofthestudywillbethebasisforphysicalimplementationtostart.Theproposalisofgoodquality.

TheproposalconcernsworksfortheimplementationofUICgaugeintherailsectionbetweenCastellbisbalandNuddeVilas-eca,alongtheMediterraneancorridor,partofPriorityProject19(HighspeedrailinteroperabilityintheIberianPeninsula).In

particular,itincludesthenecessaryadaptationsontheinstallationsandlineelementsfortheoperationof750mlongtrainsinmixedgauge.Theworkswillbecarriedoutalong90kmofdoubletrackand7kmofsingletrack,allowingtheaccesstothePortofTarragonainUICgauge.

2012-ES-19041-P • Part of Priority Project 19

Implementation of the UIC gauge in the Mediterranean Corridor. Section Castell-

bisbal-Nudo de Vilaseca. Phase 1.

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested funding

Total eligible costs €340,859,700

TEN-T requested funding: €68,171,940

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €340,855,000

TEN-T recommended funding: €68,171,000

TEN-T funding: 20%

Evaluation remarks

93

TheproposedActionishighlyrelevanttothecallforproposalsandTEN-Tprioritiesasitisakeysteptotheimplemen-tationofanimportantcrossbordersectiononPriorityProject1.TheActionisverymaturesincetechnicallytheprojectisreadytostart.TheimpactoftheActionisexpectedtobeverygood.Thequalityoftheproposalisgoodincludingsoundorganisationalstructureandprojectmanagementplan.

Thisproject,partofPriorityProject1(RailwayaxisBerlin-Verona/Milan-Bologna-Naples-Messina-Palermo),involvesapre-studyforthelinerouteingofthenorthernaccesslinetotheBrennerBaseTunnelbetweenMunich(Germany)andRadfeld

(Austria)—asectionidentifiedasaPriorityProject1bottleneckthatneedstobeurgentlyremoved.

2012-EU-01092-S • Part of Priority Project 1

PP1 Global Project Munich–Kufstein, Kufstein–Inns-bruck, Brenner Base Tunnel (cross-border) and Fortez-za–Verona: Pre-study for the Northern access line to the Brenner Base Tunnel between Munich (Germany)

and Radfeld (Austria)

PPs - New ActionMember States involved:Germany, Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested funding

Total eligible costs €6,715,000

TEN-T requested funding: €3,357,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €6,714,000

TEN-T recommended funding: €3,357,000

TEN-T funding: 50%

Evaluation remarks

94

TheproposedActionishighlyrelevanttothecallofproposalsandTEN-Tprioritiesasitaddressesakeycross-borderbottleneckonPriorityProject1andwillleadtotheconstructionoftheBrennerBaseTunnel.Itsmaturityisexcellentbecausetheactivitiesarealreadyongoing.TheimpactisalsoexcellentastheoutputoftheActionwilldeterminecriti-caldecisionmakingaspectsfortheimplementationphaseoftheGlobalProject.Thequalityoftheproposalisoverallverygoodwithwelldescribedandcoherentactivities.

TheActionispartoftheGlobalProjectfortheconstructionoftheBrennerBaseTunnel,thecentrepieceofPriorityProject1(Rail-wayaxisBerlin-Verona/Milan-Bologna-Naples-Messina-Palermo).Itinvolvestheplanningandexcavationofanexploratory

tunnelbetweenthefuturemaintubes,whichalreadyreceivesTEN-Tfunding.Additionalfundsarerequestedtocontinuetheactivitiesthroughout2014and2015,whicharecomprisedof:

•Planning,preparationoftenders,diagnosticandexplorationprobes,monitoringandcompensatorymeasures•Tunnelstability/safetymonitoringandmanagingsystemandcontrolcentre•Accesses,exploratorytunnelsandaccompanyingstructuresandfacilities•Technicalsupportmeasuresandfacilitiesinordertopreparetheconstructionofthetunnelsandmultipurposeareas•Disposalsitesandaccompanyingstructuresandfacilities

2012-EU-01098-S • Part of Priority Project 1

Priority Project 1: Brenner Base Tunnel - studies

PPs - New ActionMember States involved:Italy, Austria

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested funding

Total eligible costs €171,300,000

TEN-T requested funding: €85,650,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €171,300,000

TEN-T recommended funding: €85,650,000

TEN-T funding: 50%

Evaluation remarks

95

TheproposedActionisrelevanttothecallforproposals.TheActionhasdemonstrateditsmaturityasitistechnicallyreadytostart. It isexpectedtohavepositive impactsboth intermsofpolicy-makinganddecision-makingtools inconnectionwiththeintroductionofnewcleantechnologiesalongPriorityProjects13and26andpossiblyinotherEUmemberStates.Thequalityoftheproposalisgood.

ThisActionwillstudythebusinessfeasibilityandcustomerconvenienceofmulti-standardelectricvehiclerapidchargingstations,withassociateddeploymentalongthefulllengthofPriorityProjects13(RoadaxisUnitedKingdom/Ireland/Ben-

elux)and26(Railway/roadaxisIreland/UnitedKingdom/continentalEurope)throughtheUKandIreland.Thisisasubstantialreal-worldtrialof74rapidchargingstationscoveringover1,100kmalongmajorUKandIrishroadnetworkroutes.Thepilotalsolinkswithfivemajorseaportsandfiveinternationalairports,thuspromotingmultimodaltransportsolutionsbylinkingroaduserstoseaandairtransportmodes.

2012-EU-13066-S • Part of Priority Project 13

Accelerating the introduction of electric vehicle rapid charging by studying adoption

and use along PPs 13 and 26 in the UK and Ireland

PPs - New ActionMember States involved:United Kingdom, Ireland

Applicant:Nissan Motor (GB) Ltd

Requested funding

Total eligible costs €7,359,778

TEN-T requested funding: €3,679,888

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €7,358,000

TEN-T recommended funding: €3,679,000

TEN-T funding: 50%

Evaluation remarks

96

TheproposedActionisveryrelevanttothecallforproposalsasitaimsatdeveloppingLNGasalternativefuelforinlandwaterwaytransport.ThematurityoftheActionisgood.ItisexpectedtohaveasignificantimpactontheLNGintroductionontheaxisRhine-Main-Danube.Thequalityoftheproposalisgood.

Theaction,whichaddressesPriorityProject18(WaterwayaxisRhine/Meuse-Main-Danube)willprovideaEuropeanstrategyandpilotdeploymentsbothforLNGasfuelforinlandvesselsandascargotransportedonwaterwaysanddistributed

viainlandports.TheActionconsistsofasetoffeasibilitystudies,technicalconcepts,technicaltrialsandpilotdeploymentsofvesselsandterminals.Itisamulti-partnerapplicationof33companiesandorganisationsfrom12EUMemberStates.Itaimstoprovideaplatformforkeypublicandprivatestakeholders,facilitatingparalleldevelopmentofthenecessaryregula-toryframeworkforLNGasvesselfuelandcargo.Itwillalsodeliverinitialdeploymentinterminalandvesselinfrastructure.

2012-EU-18067-S • Part of Priority Project 18

LNG Masterplan for Rhine-Main-Danube

PPs - New ActionMember States involved:Germany, Austria, Belgium, Bulgaria, Cyprus, Czech Republic, France, Italy, Luxembourg, The Nether-lands, Romania, Slovakia

Applicant:Pro Danube Management GmbH

Requested funding

Total eligible costs €121,316,983.44

TEN-T requested funding: €60,658,492.72

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €80,520,000

TEN-T recommended funding: €40,260,000

TEN-T funding: 50%

Evaluation remarks

97

ThemostsignificantpartoftheproposedActionisnotrelevanttothecallforproposals.Howevertheremainingstudypartisrelevant.ActivitiesoftheActionrelevanttothecallaretechnicallyreadytostart.Thestudywillbeusedasagooddecision-makingtoolandtechnicalbasisforcarryingouttargetedportdevelopments;thereforetheexpactedimpactisgood.Thequalityoftheproposalisgood.

TheActionconcernstheelaborationofaconcepttomodernisetheportofGiurgiu,locatedonPriorityProject18(WaterwayaxisRhine/Meuse-Main-Danube),toconnectittotheRomanianrailwaynetworkandimproveitsenvironmentalperformancein

general.Itaimsatupgradingtheexistingportterminalonthebasisofthecurrentinfrastructuretoimproveitstranshipmentservicesandenvironmentalperformance.

2012-EU-18089-S • Part of Priority Project 18

High-performance Green Port Guirgiu

PPs - New ActionMember States involved:Romania, Austria

Applicant:ILR Logistica Romania S.R.L.

Requested funding

Total eligible costs €16,872,500

TEN-T requested funding: €8,436,250

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €800,000

TEN-T recommended funding: €400,000

TEN-T funding: 50%

Evaluation remarks

98

TheproposedActionhasagoodrelevancetothecallfofproposals,astheconcernedstudieswillleadtoworkscontrib-utingtotheremovalofabottleneckalongPriorityProject3.Itsmaturityisgoodaspreparatorystepshavebeensuc-cessfullyundertaken.TheimpactoftheActionisalsogood,astheoutcomesofthestudieswillbeusedasadecisionmakingtool,aswellasbestpractices.Thequalityisdemonstratedbythefactthattheproposedactivitiesarecoherentfromthetechnicalpointofview,andthecostsarerealistic.

Located on Priority Project 3 (High-speed railway axis of southwest Europe), the proposal refers to studies on twosections:Bordeaux-Spanishborder (partofPriorityProject3)andBordeaux-Toulouse (notonthePriorityProject).The

foreseenactivitiesincludetechnicaldesignstudies,complementaryenvironmentalstudies,preparationandmanagementofthepublicinterestenquiryphase.

2012-FR-03054-S • Part of Priority Project 3

Grand Projet du Sud Ouest - Bordeaux Espagne

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested funding

Total eligible costs €11,300,000

TEN-T requested funding: €5,650,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €11,300,000

TEN-T recommended funding: €5,650,000

TEN-T funding: 50%

Evaluation remarks

99

TherelevanceoftheproposedActiontothecallforproposalsisgoodasitconcernsstudiesforthedecongestionofacomplexlink,includingsectionsonthreePriorityProjects(3,6and24).ThematurityisdemonstratedbythefactthattheActionhasalreadystarted.Averygoodimpactisexpectedintermsofdecisionandpolicy-making,aswellasgoodpractices.Thestudieswilldefinetheactionstobetakeninthenextstagesandimprovethecooperationbetweentheinvolvedstakeholders.ThequalityoftheproposedActionisgoodintermsoflogicandclarity.

LocatedonPriorityProject3 (High-speedrailwayaxisofsouthwestEurope)andonthetwoEuropeanfreightcorridorsC/2andD/6,theproposalconcernsstudiesontheLyonrailwayjunction(NFL).Theforeseenactivitiesincludestrategic

planning(timetabeplanningandmasterplanforthefixedelectrictractionfacilities),operating(technical)studies,shortandmediumterminvestmentstudiesonNFLinfrastructures,longterminvestmentstudiesandtechnicalconsultancyservicesfortheprojectowner.

2012-FR-24053-S • Part of Priority Project 24

First stage in relieving congestion at the Lyon railway junction

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested funding

Total eligible costs €19,300,000

TEN-T requested funding: €9,650,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €19,300,000

TEN-T recommended funding: €9,650,000

TEN-T funding: 50%

Evaluation remarks

100

TheproposedActionisrelevanttothecallforproposalsasitaddressesamissinglinkalongPriorityProjects9and26.Itisverymatureasithasreceivednecessarysupportandallpreparatorystepshavebeenachieved.Intermsofimpact,theproposedActionwillrepresentanimportantdecisionmakingtool.Thequalityisgood.

TheGlobalproject(theDartUndergroundProgramme)istodeliveranewundergroundrailwaylinkthroughDublinCity,alongPriorityProjects9and26.Theproposedactionconcernsthedesignstudyandplanningpermissionapprovalforthe

renewaloftherailsignallingsystemwithintheGreaterDublinArea.

2012-IE-26043-S • Part of Priority Project 26

City centre re-signalling project - Connolly Station to Sandymount

Station - design stage

PPs - New ActionMember States involved:Ireland

Applicant:Department of Transport, Tourism and Sport

Requested funding

Total eligible costs €1,449,000

TEN-T requested funding: €724,500

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €1,448,000

TEN-T recommended funding: €724,000

TEN-T funding: 50%

Evaluation remarks

101

TheproposedActionishighlyrelevantasitaimsateliminatingabottleneckalongPriorityProject6.Thematurityisexcellentastheworkshavestartedandthebudgetissecured.Ithasaveryhighimpactasitwillproduceverypositivesocio-economiceffectsintermsofcontributiontoregionalandnationalcompetitiveness,andreductionoftraveltimes.Thequalityisgood,logicalandclear.

Located on Priority Project 6 (Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border),theproposalconcernsworksonthehighspeedTreviglio–BresciarailwaylinesectionandWestBresciainterconnection.The

foreseenactivitiesincludepreparatoryworks,worksattheSerioandOglioviaducts,cuttingsandembankmentsoftheWestBresciainterconnector,worksbetweentheconcernedsectionandthenearbyMilan-Bergamo-Bresciamotorwaylinkunderconstruction,worksontheurbanentryoftheWestBresciainterconnectionandworksonBresciaCentralStation(civilworks,equipment,systemsforelectrictractionandsignaling/computerisedinterlocking).

2012-IT-06072-P • Part of Priority Project 6

High Speed/High Capacity Treviglio-Brescia section: completion of first construction lot

and adaptation of Brescia station

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested funding

Total eligible costs €729,051,789

TEN-T requested funding: €145,810,360

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €657,650,000

TEN-T recommended funding:€131,530,000

TEN-T funding: 20%

Evaluation remarks

102

TheproposedActionisrelevanttothecallforproposalsasitaddressesPriorityProject10.Itsmaturityisgood.Theimpactisexpectedtobeverygoodasitwillsupportmultimodalsplitandinteroperability.Thequalityoftheproposalisgood.Moreover,theleverageeffectoftheEUfundinginprivatefundingisveryhigh.

TheGlobalProject(MXPNorthRailAccess)aimstoconnectMalpensaAirportwiththeSimplonandGotthardinternationalrailwaylines.TheproposedActionconcernstheextension,fromTerminal1toTerminal2,oftheexistingpassengerrailway

linktoMalpensaAirport.

2012-IT-10071-P* • Part of Priority Project 10

MXPT2(Railink)-UP

PPs - New ActionMember States involved:Italy

Applicant:Railink S.r.l.

Requested funding

Total eligible costs €115,000,000

TEN-T requested funding: €23,000,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €115,000,000

TEN-T recommended funding: €23,000,000

TEN-T funding: 20%

*This proposal was originally submitted as 2012-IT-24071-P

Evaluation remarks

103

TheproposedAction isrelevanttothecallforproposalsandaddressestheTEN-Tpriorities,as itconcernsPriorityProjects6and24.Itismatureandreadytostartfromatechnicalpointofview.TheproposedActionisexpectedtogeneratepositivesocio-economicimpacts.Theoverallqualityisgood.Itiswellstructuredandconsistentfromatech-nicalpointofview.

The proposed Action concerns the first phase of a Global Project related to the upgrade of Novara Intermodal Terminal in northern Italy. CIM SpA - Interporto di Novara, which has built and manages the Freight Village (Interporto) of Novara, in

the areas siding the rail marshalling yard of Novara, has a strategic plan for industrial development 2011-2019. This plan consists of three phases, through which CIM Terminal and the connections with Novara Boschetto yard will be improved.

The present Action is included in the vast project aimed at realising a Single Intermodal Terminal (TIU) in Novara, consisting of three interconnected terminals and a system of logistics and service platforms, within and outside the Freight Village. The expansion and enhancement project of the west yard is composed of the following activities:

•Installationofa600mlongtrack•Revampingandincreasingtheintermodalyard•InstallationoffixedequipmentforITUtranshipment

2012-IT-24116-P • Part of Priority Project 6

CIM west terminal expansion

PPs - New ActionMember States involved:Italy

Applicant:C.I.M. S.p.A.

Requested funding

Total eligible costs €10,000,000

TEN-T requested funding: €2,000,000

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €10,000,000

TEN-T recommended funding: €2,000,000

TEN-T funding: 20%

Evaluation remarks

104

ThisproposedAction’srelevancetothecallforproposalsisverygood,sinceitwillleadtothephysicalimplementationoftheworkstoremoveabottleneckonPriorityProject28.Itsmaturityisexcellentbecausepreparatoryactionshavebeensuccessfullycompleted.TheimpactoftheproposedActionisalsogoodbecausethelineiscurrentlysaturated.Itsqualityisgoodandconsistentfromatechnicalpointofview.

TheproposedActionconcernsthestudiesfortheconstructionofanewrailwaylinefromLuxembourgtoBettembourg,neartheLuxembourg-FranceborderandlocatedonPriorityProject28(“Eurocaprail”ontheBrussels-Luxembourg-Strasbourg

railwayaxis).

They comprise the detailed pre-design and implementation plan for the new rail link between Luxembourg station andBettembourg,aswellastheupgradeofBettembourgstation.

2012-LU-28025-S • Part of Priority Project 28

EuroCap-Rail: studies for the construction of a new section providing the direct link Luxem-bourg Station-Bettembourg and the upgrading

of Bettembourg Station

PPs - New ActionMember States involved:Luxembourg

Applicant:Ministère du Développement durable et des Infrastructures

Requested funding

Total eligible costs €9,625,825

TEN-T requested funding: €4,812,911

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €9,624,000

TEN-T recommended funding: €4,812,000

TEN-T funding: 50%

Evaluation remarks

105

TheproposedActionishighlyrelevant,sinceiteliminatesthebottlenecksinrailwaytransportonPriorityProject27.Itismaturearepreparatorystepsareabouttobefinalised.TheproposedAction,inconjunctionwiththecomplementaryactivitiesandstudiesunderway,hasaleverageimpactondevelopmentofPriorityProject27.

TheproposedActionispartoftheGlobalProjectwhichisdevelopmentofEuropeangaugerailwaylineintheLatvianpartofPriorityProject27(“RailBaltica”axis:Warszawa-Kaunas-Riga-Tallinn-Helsinki).Itincludespreparatorystudiescovering

preliminarydesignandadditionaltechnicalstudiestobeginthedetailedtechnicaldesignandconstructionworksinthenextprogrammingperiod.

2012-LV-27120-S • Part of Priority Project 27

Preliminary design and operations studies for Rail Baltica railway line -

Latvian section

PPs - New ActionMember States involved:Latvia

Applicant:Ministry of Transport

Requested funding

Total eligible costs €9,840,000

TEN-T requested funding: €4,920,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €9,840,000

TEN-T recommended funding: €4,920,000

TEN-T funding: 50%

Evaluation remarks

106

TheproposedActionisveryrelevantasthestudyisaimingtoremoveacriticalrailwaybottleneckonPriorityProject12.Anexcellentmaturityisdemonstrated:basedontheoutcomeofpreviousstudyphasestheproposedActionhasalreadystarted.Ithasaverygoodimpactasthesectionconcernedisabusyrailwaywithpotentialforverygoodaddedvaluefromitsimprovement.Thequalityisverygoodastheorganisationalstructure,theriskmanagementandqualitymanagementpartsarewellinplace.

Theproposal concerns rail studies forexpanding8kmof lineofPriorityProject12 (NordicTriangle railway/roadaxis)betweenFlackarpandArlovfromtwotrackstofour,aswellasadjustingthreeintermediaterailwaystationstothenew

geometryofthetracks.TheexpectedresultofthestudyisanEnvironmentalImpactAssessment,arailwayplanandconstruc-tiondocumentspriortothedesignandconstructionphase.TheaimoftheprojectistocontinuethefourtracksalreadyinplacebetweenMalmoandArlov,thuseliminatingacapacityshortageonthishighlycongestedrailsectionofPriorityProject12.

2012-SE-12033-S • Part of Priority Project 12

Design studies for expansion to four tracks of Nordic Triangle at Flackarp-

Arlöv in Sweden

PPs - New ActionMember States involved:Sweden

Applicant:Swedish Transport Administration

Requested funding

Total eligible costs €19,086,678

TEN-T requested funding: €9,543,339

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €19,086,000

TEN-T recommended funding: €9,543,000

TEN-T funding: 50%

Evaluation remarks

107

TheproposedActionisveryrelevantasitaddressesanimportantbottleneckalongPriorityProject12.Alsoitsmatu-rityisexcellent.Ithasalreadystartedandtherearenopendingtechnicalissues.Itwillhaveaverypositiveimpactonlabourmarket,accessibility,mobility,trafficmanagementandnoise.Finally,theoverallproposalisofverygoodqualityintermsofitslogic,completenessandclarity.

TheGlobalProjectaddressestheWestCoastLinelocatedinsouthernSweden,andoneofthethreebranchesofPriorityProject12(NordicTrianglerailway/roadaxis).TheproposedActionconcernstheconstructionoftwo8.7kilometrelong

parallelrailwaytunnelsthroughtheHallandsåsRidge.

2012-SE-12048-P • Part of Priority Project 12

Completion of the railway tunnel through Hallandsås – a

priority project in the Nordic Triangle

PPs - New ActionMember States involved:Sweden

Applicant:Swedish Transport Administration

Requested funding

Total eligible costs €396,808,204

TEN-T requested funding: €79,361,640

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €396,808,000

TEN-T recommended funding: €79,361,000

TEN-T funding: 20%

Evaluation remarks

108

TheproposedActionhasanexcellentrelevancebyaddressinganimportantbottleneck.Itishighlymatureasthepre-paratoryworkshavealreadystarted.Itsimpactiswelldemonstratedthroughadetailedcost-benefitanalysis;itwillcontributetoshiftoffreightandpassengertransportfromroadtorail.ThequalityoftheproposalisexcellentingivingspecificinformationontheproposedAction,inparticularonitsorganisationstructureandriskmanagement.

Theproposalconcernstheconstructionofa1.5kmrailbridgeandtrackinGothenburg,doublingthecapacityoftheexist-ingsingletrack.TheproposalispartoftheGlobalProject“WestSwedishAgreement”,apackageofinfrastructureprojects

targetingpublictransport,railwaysandroadsinGothenburgarea.

TheaimoftheActionistoeliminateabottleneckandtofacilitatetheconnectionbetweenPriorityProject12andthePortofGothenburg.

2012-SE-12069-P • Part of Priority Project 12

The Gothenburg Port Line - railway bridge at Marieholm

PPs - New ActionMember States involved:Sweden

Applicant:Swedish Transport Administration

Requested funding

Total eligible costs €120,447,648

TEN-T requested funding: €24,089,530

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €120,445,000

TEN-T recommended funding: €24,089,000

TEN-T funding: 20%

Evaluation remarks

109

TheproposedActionisinlinewiththeTEN-TprioritiesasitaddressesabottleneckonPriorityProject6.Itsmaturityisgoodasitisreadytostartfromthetechnicalpointofview.TheimpactoftheActionwillbesignificantasacriticalstepleadingtophysicalimplementation.Theproposalisofverygoodquality.

The Action covers the building permit and executive design for the upgrade the Pragersko railway station, an important rail-way traffic hub situated at the double-track Zidani Most–Pragersko–Maribor–state border line and part of Priority Project 6

(Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border). It includes track devices (main tracks as well as tracks for dispatching and assembling trains, collecting cargo, storing wagons, etc.). In accordance with the ap-plicable construction legislation, both documents are the basis for the acquisition of the building permit and physical imple-mentation of the project.

2012-SI-06083-S • Part of Priority Project 6

Elaboration of the project for building permit and executive design for the arrangement of a hub by upgrading

the Pragersko railway station

PPs - New ActionMember States involved:Slovenia

Applicant:Ministrstvo za infrastrukturo in prostor Republike Slovenije

Requested funding

Total eligible costs €4,280,000

TEN-T requested funding: €2,140,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €4,280,000

TEN-T recommended funding: €2,140,000

TEN-T funding: 50%

Evaluation remarks

110

TheproposedActionishighlyrelevanttothecallforproposalsasitintendstoeliminateabottleneckonPriorityProject6.Itisverymatureasallapprovalshavebeenreceived.Itsimpactisgoodasitwillbeusedasinputtofurtherdecision-making.Theproposalisofgoodquality.

TheActionaimsatdraftingtheexecutiondesignforaD4categoryupgradeoftheexisting25kmlongmaindouble-trackelectrifiedZidaniMost–Celjerailwaysection,partofPriorityProject6 (RailwayaxisLyon-Trieste-Divača/Koper-Divača-

Ljubljana-Budapest-Ukrainianborder).Theexecutiondesign is,accordingtothenational lawapplicable,apreconditiontostarttheupgradingoftheline.

2012-SI-06086-S • Part of Priority Project 6

Execution design for upgrading the existing main double-track electrified

Zidani Most-Celje railway line

PPs - New ActionMember States involved:Slovenia

Applicant:Ministrstvo za infrastrukturo in prostor Republike Slovenije

Requested funding

Total eligible costs €3,500,000

TEN-T requested funding: €1,750,000

TEN-T funding: 50%

Recommended fundingTotal eligible costs: €3,500,000

TEN-T recommended funding: €1,750,000

TEN-T funding: 50%

Evaluation remarks

111

TheproposedActionisveryrelevant,contributingtoremoveasignificantbottleneckonPriorityProject13.Itsmaturityisveryhighsincetheworksareveryadvanced.Itsimpactisalsoverygoodintermsoftrafficflowimprovement,posi-tiveimpactontheroadservicelevel,roadsafety,aswellasonregionalandnationalcompetition.Furthermore,thequalityoftheproposedActionisverygood.

Theproposalconsistsofworkstoupgradethelast,remainingsinglecarriagewaysectionoftheA8road,astrategicallyim-portantroadwithinNorthernIrelandandpartofPriorityProject13(RoadaxisUnitedKingdom/Ireland/Benelux),between

Coleman’sCornerandBallyrickardRoad.This14kmlongsectionwillbeupgradedtoadualcarriagewaystandard.

2012-UK-13018-P • Part of Priority Project 13

A8 Belfast to Larne Dualling (Coleman’s Corner to Ballyrickard

Road)

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested funding

Total eligible costs €112,520,388.76

TEN-T requested funding: €22,504,078.56

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €91,860,000

TEN-T recommended funding: €18,372,000

TEN-T funding: 20%

Evaluation remarks

112

TheproposedActionisveryrelevanttothecallforproposalsbyimprovingmultimodalcapacitymainlyalongPriorityProjects13and26.Itcontributestothedevelopmentofrailoperations.TheproposedActionisverymature.Ithasexcellentpositivedirectandindirectsocio-economicbenefits.Thequalityoftheproposalisexcellent,wellstructured,andcomprehensive.

TheActioncomprisestheprocurement,installationandcommissioningofthreerailmountedgantrycraneswith41tonneliftcapacity,31mrailgaugeonthenewlyconstructedFelixstowerailterminal.Theterminalisduetobeoperationalmid-

2013withthreerailmountedgantrycranes.TheActionislocatedontheFelixstowe-Nuneatonrailwayline(locatedonPriorityProject26-Railway/roadaxisIreland/UnitedKingdom/continentalEurope)andtheA14trunkroad.InadditionasignificantschemeisbeingundertakenonPriorityProject26byNetworkRailInfrastructureLtdknownastheIpswichChordworks.Theoperationoftheseworksin2014willprovidesignificantopportunityalongwithsynergisticprojectstosignificantlyimprovecapacityandregulationofintermodalservicesalongthePriorityProject26andPriorityProject14(Westcoastmainline)roadandrailroutes.Theadditionofthreerailmountedgantrycranesthatwillbeoperationalby2014and2015ontheFelixstowerailterminalwillenableafurtherstepinthemodalswitchfromroadtorail.

2012-UK-26030-P • Part of Priority Project 26

Felixstowe rail terminal (phase 2) - Further improving intermodal transfer

and removing bottlenecks on PP26

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested funding

Total eligible costs €13,227,000

TEN-T requested funding: €2,645,400

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €8,620,000

TEN-T recommended funding: €1,724,000

TEN-T funding: 20%

Evaluation remarks

113

TheproposedActionishighlyrelevantasitaddressesexcellentlytheTEN-Tprioritiesandtheobjectivesofthecallforproposals.ItconcernsoptimisationofcapacityalongPirorityPorject26.Itsimpactisexcellent.TheproposedActionwillleadtoroaddecongestion,increaseinsafetyandenvironmentalbenefits.Thematurityandqualityareverygood,withastrongcommitmentbytheconcernedauthorities.

TheAction,IpswichChord,willdeliveranewrailwayinfrastructurelinkinguptwobranchesofPriorityProject26(Railway/roadaxisIreland/UnitedKingdom/continentalEurope)toallowrailfreightservicestotraveldirectlybetweentheTEN-TPortof

FelixstoweandkeyhubcitiessuchasBirminghamandManchester.

Currently,trainshavetoenterthegoodsyardatIpswich,andreconfigurebymovingthelocomotivetotheotherendofthetrainbeforebeingabletoproceedoutoftheyardontothewesternsectionoftheaxis.ThisActionwillremovethissignificantperformanceandcapacitybottleneckandallowfaster,safer,longerandmoredirecttrafficflowsbetweenthekeyTEN-TportsintheUKandalongthePriorityProject.

2012-UK-26058-P • Part of Priority Project 26

Completing PP26 south (Felixstowe- Nuneaton) and delivering the TEN-T Core

rail network in the UK: Ipswich Chord

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested funding

Total eligible costs €62,078,583.41

TEN-T requested funding: €12,415,717.68

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €62,075,000

TEN-T recommended funding: €12,415,000

TEN-T funding: 20%

Evaluation remarks

114

TheproposedActionishighlyrelevantbyaddressingtheremovalofabottleneckonasignificantrailwaysectiononPriorityProject26.Itdemonstratesitshighmaturitywithformalapprovalalreadyobtainedandcertaintasksalreadylaunched.Ithasaconsiderablepositiveimpactbothonmodalshiftandenvironmentalperformanceofthetransportsectorinthearea.Theoverallqualityoftheproposalisverygoodbyprovidingasufficientlevelofdetails,clarityandconsistencyinallcrucialpartsoftheproposal.

Theproposal,partofGlobalProjectthatcoverscompletionofPriorityProject26(Railway/roadaxisIreland/UnitedKingdom/continentalEurope)intheUK,concernstheelectrificationoftherailwaysectionfromManchestertoLiverpool,aswellas

theTransPennineElectrificationWestfromManchestertoStalybridge.

2012-UK-26060-P • Part of Priority Project 26

Completing PP26 north and deliver-ing the TEN-T Core rail network in the UK: Transpennine rail electrification

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested funding

Total eligible costs €155,159,807.71

TEN-T requested funding: €31,031,961.34

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €155,155,000

TEN-T recommended funding: €31,031,000

TEN-T funding: 20%

Evaluation remarks

115

TheproposedActionisveryrelevantandhasasatisfactorylevelofmaturity,expectedimpactsandquality.Concerningimpact,itisexpectedtocontributetothedevelopmentofBio-LiquidNaturalGasforHeavy-Goods-VehiclesintheUKalongthepriorityprojects.Itsmaturityisdemonstratedasimplementationisalreadyongoingandpreliminaryresultsareexpectedbyendof2014.Thiscouldserveasagooddecision-makingandpolicymakingtool.

TheActionaimsataddressingthethreemainbarrierstothedevelopmentofalternativefuels:thelackofinfrastructure,the lackofvehiclesatcompetitiveprices,andthe lowconsumerdemand.Studieswillbeundertaken includingapilot

componenttotesttheuseofBio-LNGinalivetrialwithHGVoperatorsusingapilotnetworkofopenaccessstorageandrefuellingterminalsservingpriorityaxesintheUK.Themainoutcomeofthestudywillbeabusinessmodelandaroadmapfordeploymentofbio-LNGacrosstheTEN-TnetworkthroughoutEurope.Theprojectactivitiesincludeapilotoffiverefuellingstationsandmobileinfrastructure.

2012-UK-26061-S • Part of Priority Project 26

Study to test the potential of Bio-LNG to con-tribute to European renewable energy targets

based on a pilot refuelling and storage network trialled with HGV fleet operators in the UK

PPs - New ActionMember States involved:United Kingdom

Applicant:Gasrec Ltd

Requested funding

Total eligible costs €16,411,000

TEN-T requested funding: €5,774,000

TEN-T funding: 35.18%

Recommended fundingTotal eligible costs: €16,408,572

TEN-T recommended funding: €5,743,000

TEN-T funding: 35%

116

Multi-Annual Call 2012Projects recommended for funding

PPs

Priority Projects:Ongoing Actions

Evaluation remarks

117

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillfacilitatethefinalisationoftheupgrademeasuresthatarepartofthisAction.ThematurityoftheActionisverygood.Thequalityoftheproposalisverygoodincludingsoundrevisedimplementationplans.

TheproposedActionrequestsanincreasedco-fundingratefrom6.64%to20%fortheAction2007-DE-04020-P(WorksfortheconstructionofthehighspeedraillinesectionbetweenSaarbrückenandLudwigshafen)Thisprojecttargetsat

reducinganimportantrailbottleneckbetweenSaarbrückenandLudwigshafen,GermanyonPriorityProject4,thehighspeedrailwayaxiseast.Workswillupgradethissectioninordertoreachtravellingspeedsupto200km/h,primarilyinvolvingtrackengineeringtaskssuchasrefinedlinealignment,strengtheningthegroundstructure,improvingtheclearanceoflevelcross-ingsandwideningbridges.Thetrack’swiringandcontrolandcommunicationstechnologieswillalsoberenewed—includingequippingthetrackwithERTMStechnology.

Linked to Action 2007-DE-04020-P

2012-DE-04057-P • Part of Priority Project 4

POS Nord

PPs - Ongoing ActionMember States involved:Germany

Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung

Requested funding

Total eligible costs €74,200,114

TEN-T requested funding: €9,913,135

TEN-T funding: 13.36%

Recommended fundingTotal eligible costs: €73,750,414.70

TEN-T recommended funding: €9,882,556

TEN-T funding: 13.4%

Evaluation remarks

118

The proposal has demonstrated that an increase of the co-funding rate will facilitate the implementa-tion of this Action that addresses a bottleneck. Thematurity of the Action is very good as its implementation isalreadyongoing.Thequalityoftheproposalisverygoodincludingconsistentrevisedimplementationplans.

The proposed Action requests an increased co-funding rate from 14.35% to 20% for the Action 2007-DE-17010-P (Works for the construction of a high speed line between Wendlingen and Ulm).

The new build Wendlingen-Ulm line forms part of the Stuttgart-Ulm-Augsburg upgrade project and is an integral part of Priority Project 17 (Railway axis Paris-Strasbourg-Stuttgart-Wien-Bratislava). It covers a track length of 59.575 km, of which 30.218 km (excluding the Wendlingen freight line) run in tunnel sections. The line is configured for mixed traffic (long-distance passenger traffic, in addition to fast and light freight trains).

Linked to Action 2007-DE-17010-P

2012-DE-17046-P • Part of Priority Project 17

Works for the construction of a high speed line: Wendlingen-Ulm section

PPs - Ongoing ActionMember States involved:Germany

Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung

Requested funding

Total eligible costs €625,741,449

TEN-T requested funding: €35,354,392

TEN-T funding: 5.65%

Recommended fundingTotal eligible costs: €537,895,748

TEN-T recommended funding: €30,383,615

TEN-T funding: 5.65%

Evaluation remarks

119

Theproposalhasdemonstrated thatan increaseof the co-funding ratewill facilitate thesmooth implementationoftheAction.ThematurityoftheAction isverygoodas its implementation isalreadyongoing.Thequalityoftheproposalisveryhighincludingsoundrevisedimplementationplans.However,takingintoaccounttheneedtomanagethescarcityoftheavailableTEN-Tfundingandtherevisedimplementationplansfortheprojectiswasdecidednottograntthemaximumallowedrate.

TheproposedActionrequestsanincreasedco-fundingratefrom11.61%to20%fortheAction2007-DE-17200-P(WorksfortheconstructionofthehighspeedlinebetweenStuttgartandWendlingen).

ItinvolvesanupgradeandnewbuildoftheStuttgart-Wendlingenline,includingStuttgart21,whichisanintegralpartofPri-orityProject17(RailwayaxisParis-Strasbourg-Stuttgart-Wien-Bratislava),aswellastheStuttgart-Ulm-Augsburgupgrade/newbuildline,includedintheFederalTransportInfrastructurePlanasapriorityproject.

Linked to Action 2007-DE-17200-P

2012-DE-17050-P • Part of Priority Project 17

Stuttgart-Wendlingen high speed line (including Stuttgart 21): upgrade and

works

PPs - Ongoing ActionMember States involved:Germany

Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung

Requested funding

Total eligible costs €756,688,129

TEN-T requested funding: €63,507,480

TEN-T funding: 8.39%

Recommended fundingTotal eligible costs: €756,688,129

TEN-T recommended funding: €20,616,775

TEN-T funding: 2.73%

Evaluation remarks

120

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillfacilitatetheimplementationoftheAction.ThematurityoftheActionisveryhighasitsimplementationisongoingandtimely.Thequalityoftheproposalisverygoodincludingsoundandconsistentrevisedimplementationplans.

TheproposedActionrequestsanincreasedco-fundingratefrom9.71%to20%fortheAction2007-DE-24060-P(Worksforconstructionandre-constructionofthepartiallyexistingrailwaysectionbetweenKarlsruheandBasel).Itconcernsthe

upgradeoftheexistingtwo-tracklinetofourtracksandconstructionofthenewhighspeedrailsegmentsbetweenKarlsruheandBaselonPriorityProject24(RailwayaxisLyon/Genova-Basel-Duisburg-Rotterdam/Antwerpen).

Linked to Action 2007-DE-24060-P

2012-DE-24037-P • Part of Priority Project 24

Upgrade/new construction of the Karlsruhe-Basel line with partial

upgrading of the existing line

PPs - Ongoing ActionMember States involved:Germany

Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung

Requested funding

Total eligible costs €338,913,000

TEN-T requested funding: €34,874,148

TEN-T funding: 10.29%

Recommended fundingTotal eligible costs: €327,714,565

TEN-T recommended funding: €33,721,829

TEN-T funding: 10.29%

Evaluation remarks

121

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillgiveasignificantimpulsetotheongoingworks.Thematurityoftheconcernedworksisveryhighandthefinalisationoftheimplementationoftheproposedworksbytheendof2015isrealistic.Theproposalisofverygoodquality.

The proposal concerns the works on the 60 km Bergara-Hernani section, located on PriorityProject3 (High speed railway axis of southwest Europe) and includes:

•AnincreaseintheTEN-Tco-fundingratefrom5%to30%fortheworkscontrolactivitiesoftheongoingAction2007-ES-03050-P(HighspeedrailwaylineParis-Madrid:newrailwaynetworkGuipúzcoano).

•WorksontheBergara-Hernanisection,asanewactivity,forwhichaco-fundingrateof30%isrequested.

Linked to Action 2007-ES-03050-P

2012-ES-03093-P • Part of Priority Project 3

Construction of the new rail network in the Basque Country. Gipuzoka section.

PPs - Ongoing ActionMember States involved:Spain

Applicant:Gobierno Vasco. Departamento de Medio Ambiente y Politica Territorial

Requested funding

Total eligible costs €1,087,899,223

TEN-T requested funding: €326,369,767

TEN-T funding: 30%

Recommended fundingTotal eligible costs: €39,556,579

TEN-T recommended funding: €5,933,487

TEN-T funding: 15%

Evaluation remarks

122

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectonthebudgetallocationbetweentheMemberStatesinvolvedthusfacilitatingtheimplementationoftheAction.ThematurityoftheActionisundisputableasitisongoingandintime.Theproposalisofverygoodquality,clearandcompleteandincludessoundrevisedimplementationplans.

This proposal requests an increase of the TEN-T co-funding rate from the current 27% to 30% for the ongoing Action 2007-EU-01180-P (Priority Project TEN no. 1 Brenner Base Tunnel – Works), part of the Global Project to build the Bren-

ner Base Tunnel, the centrepiece of PriorityProject1 (Railway axis Berlin-Verona/Milan-Bologna-Naples-Messina-Palermo).

The Action involves the so-called Phase III activities, aiming to fund the excavation of the Brenner Base Tunnel’s main tubes between 2010-2015. The works are the continuation of Phase II, which is running in parallel.

Linked to Action 2007-EU-01180-P

2012-EU-01099-P • Part of Priority Project 1

Priority Project 1: Brenner Base Tunnel - works

PPs - Ongoing ActionMember States involved:Italy, Austria

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested funding

Total eligible costs €558,900,000

TEN-T requested funding: €167,670,000

TEN-T funding: 30%

Recommended fundingTotal eligible costs: €558,900,000

TEN-T recommended funding: €16,767,000

TEN-T funding: 3%

Evaluation remarks

123

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectontheimplementationoftheActionandwillfacilitatetheinvolvedMemberStatestomakefurtherdecisionsontheGlobalProject.ThematurityoftheActionisverygoodastherevisedimplementationplansaresoundfromatechnicalandfinancialpointofview.Theproposalisofgoodquality.

This proposal requests an increase of the TEN-T co-funding rate from25% to 30%, forworks of the ongoing Action2007-EU-03080-P(StudiesandworksfortheHighSpeedRailwayAxisofSouthwestEurope(PriorityProject3)-Lisbon-

Madridaxis:cross-bordersectionÉvora-Mérida.

Linked to Action 2007-EU-03080-P

2012-EU-03115-P • Part of Priority Project 3

Works for the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid axis: Cross-border section Évora-Mérida

PPs - Ongoing ActionMember States involved:Spain, Portugal

Applicant:Dirección General de Ferrocarriles

Requested funding

Total eligible costs €174,625,856

TEN-T requested funding: €52,387,757

TEN-T funding: 30%

Recommended fundingTotal eligible costs: €174,625,856

TEN-T recommended funding: €8,731,293

TEN-T funding: 5%

Evaluation remarks

124

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectontheimplementationoftheAction.ThematurityoftheActionisverygoodastherevisedimplementationplansaretechni-callyandfinanciallysound.Thequalityoftheproposalisgood.

Located on PriorityProject6 (Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border), the proposal refers to the cross-border section of the common Franco-Italian part of the Lyon-Turin international section,

foreseen under the ongoing Action 2007-EU-06010-P.

It requests an increase of the TEN-T co-funding rate (from 27 to 30%) for the land acquisition component of the Action.

Linked to Action 2007-EU-06010-P

2012-EU-06049-P • Part of Priority Project 6

Request for additional 2012-2015 funds for land acquisitions on the

cross-border section of the Lyon-Turin

PPs - Ongoing ActionMember States involved:France, Italy

Applicant:Ministère de l’Ecologie, du Développement Durable et de l’Energie

Requested funding

Total eligible costs €684,316,192

TEN-T requested funding: €300,032,600

TEN-T funding: 43.84%

Recommended fundingTotal eligible costs: €189,697,509

TEN-T recommended funding: €5,690,925

TEN-T funding: 3%

Evaluation remarks

125

Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectontheimplementationoftheAction.ThematurityoftheActionisverygoodasitincludesasoundandverywell-structuredrevisedimplementationplan.Theproposalisofveryhighquality,clearandcomplete.

ThisproposalrequestsanincreaseoftheTEN-Tco-fundingratefrom23.89to30%,fortheworksoftheongoingAction2007-EU-20050-P(StudiesandWorksfortheconstructionofFehmarnBeltFixedRail-Roadlink).

Linked to Action 2007-EU-20050-P

2012-EU-20024-P • Part of Priority Project 20

Fehmarn belt fixed rail/road link

PPs - Ongoing ActionMember States involved:Denmark, Germany

Applicant:Ministry of Transport (DK)

Requested funding

Total eligible costs €289,253,100

TEN-T requested funding: €106,534,500

TEN-T funding: 36.83%

Recommended fundingTotal eligible costs: €190,460,000

TEN-T recommended funding: €11,637,106

TEN-T funding: 6.11%

Evaluation remarks

126

TheproposedincreaseofTEN-TsupportishighlyrelevanttothecallforproposalsasitisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevel.Theproposalisofgoodquality.

ThisActionisrelatedtothecross-bordersectionofPriorityProject30linkingtheFrenchandBelgianinlandwaterwaynet-work,inclassVbontheentiresection.Theobjectiveistocreate,onamajoraxis,anewEuropeanfretcorridorlinkingthe

northernportsfromLeHavretoRotterdamtotheinlandportsinnorthernEurope(Paris,Lille,Bruxelles,Lliège,Duisburg,…).

This link will allow the economic stakeholders in various industrial and logistical sectors to concentrate their means on the inland waterway and railway networks, putting the transport nodes at the vicinity of production, transformation and consump-tion areas. Completing the missing link of the Seine North Europe canal (SNE) between Compiègne and Aubencheul-au-bac is a prerequisite.

The inland waterway transport network associated to SNE will provide for a reduction of the energy consumption linked to fret transport, for safer roads, congestion reduction and CO2 reduction, whilst developing waterborne logistic services fitting supply needs in urban areas.

Linked to Action 2007-EU-30010-P

2012-EU-30081-P • Part of Priority Project 30

Seine-Scheldt Inland Waterway Network – Crossborder section between Compiègne and Ghent

PPs - Ongoing ActionMember States involved:France, Belgium

Applicant:Ministère de l’écologie, du développement durable et de l’énergie

Requested funding

Total eligible costs €1,016,151,001

TEN-T requested funding: €354,735,000

TEN-T funding: 34.91%

Recommended fundingTotal eligible costs: €37,300,000

TEN-T recommended funding: €11,190,000

TEN-T funding: 30%

Evaluation remarks

127

TheproposedincreaseofTEN-Tsupportishighlyrelevanttothecallforproposalsasitisexpectedtopartiallyal-leviatethefinancialburdencausedbytheincreaseofthecostoftheproject.ThereforetheincreasedEUcontributionisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.

The proposal concerns the request for the increase of co-funding rate from 5% to 20% for the ongoing action “Works for the development of the railway line connection between Helsinki Airport and the PP12 lines” - 2007-FI-12050-P. This

project consists of works for construction of a double track electrified line connecting Helsinki Airport to the city centre and to the national rail network.

Linked to Action 2007-FI-12050-P

2012-FI-12087-P • Part of Priority Project 12

Airport railway line (RING-line)

PPs - Ongoing ActionMember States involved:FInland

Applicant:Ministry of Transport and Communications

Requested funding

Total eligible costs €290,426,101

TEN-T requested funding: €58,085,220

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €178,585,651

TEN-T recommended funding: €26,787,847

TEN-T funding: 15%

Evaluation remarks

128

TheproposedincreaseofTEN-Tsupportishighlyrelevanttothecallforproposalsasitisexpectedtopartiallyallevi-atethefinancialburdencausedbytheincreaseofthecostoftheproject.ThereforetheincreasedEUcontributionisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.

Located on Priority Project 3 (High-speed railway axis of southwest Europe), the proposal refers to the ongoing Action 2007-FR-03010-P (High speed railway line between Nîmes and Perpignan) related to the 70 km Nimes and Montpellier

bypass (CNM).

The proposal requests an increase in the co-funding rate (from 5 to 20%) for the following activities:

•Activity4:-worksonjunctionsunderRFFauthority•Activities6and7:CNMcivilworksandworksonrailinfrastructures(underPPPcontractorauthority)

Linked to Action 2007-FR-03010-P

2012-FR-03056-P • Part of Priority Project 3

Nimes-Montpellier bypass - Works

PPs - Ongoing ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested funding

Total eligible costs €1,133,896,589

TEN-T requested funding: €226,779,317

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €696,532,737

TEN-T recommended funding:€104,479,910

TEN-T funding: 15%

Evaluation remarks

129

Theproposal isrelevant,asthe increasedEUfundingwillhelptofillthegapinthenationalfunding.TheAction ismature,theconcernedactivitieshavestartedandareprogressingasscheduled.Thequalityoftheproposalisgood,theactivitiesbeingconsistentwiththeAction’sobjectivesandwiththeimplementationplans.

Located on Priority Project 3 (High-speed railway axis of southwest Europe), the proposal refers to the 2nd phase works on the Bordeaux railway junction, foreseen under the ongoing Action 2007-FR-03120-P (Elimination of rail bottlenecks

around Bordeaux).

The proposal requests to increase the co-funding rate (from 5 to 20%) for the civil engineering and railway equipment works between the Cenon junction and La Benauge, listed under activity 2 of the current co-funding Decision (2011)5619.

Linked to Action 2007-FR-03120-P

2012-FR-03059-P • Part of Priority Project 3

Relieving congestion at the Bordeaux railway hub

PPs - Ongoing ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested funding

Total eligible costs €147,324,509

TEN-T requested funding: €29,464,902

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €147,324,509

TEN-T recommended funding: €22,098,676

TEN-T funding: 15%

Evaluation remarks

130

TheproposedincreaseofTEN-Tsupportishighlyrelevanttothecallforproposalsasitisexpectedtopartiallyallevi-atethefinancialburdencausedbytheincreaseofthecostoftheproject.ThereforetheincreasedEUcontributionisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.

The proposed Action requests for an increased co-funding rate from5% to 20% for Activity 3 of the ongoing ActionSouthernAccesslinetoBrenner.

Moreconcretely,Activity3consistsoftheconstructionofthefirstfunctionalphaseofsub-lot1,betweenFortezzaandPonteGardena.Theothertwoactivitiesregardtheupdateofthepreliminarystudyanddefinitiveprojectforlots1and4,Fortezza-PonteGardenaandaccesstoVeronarespectively,currently50%co-funded.

Linked to Action 2007-IT-01030-M

2012-IT-01079-P • Part of Priority Project 1

Southern Access line to Brenner

PPs - Ongoing ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested funding

Total eligible costs €36,890,340

TEN-T requested funding: €7,378,068

TEN-T funding: 20%

Recommended fundingTotal eligible costs: €36,890,340

TEN-T recommended funding: €5,533,551

TEN-T funding: 15%

131

Multi-Annual Call 2012

Projects NOT recommended for funding

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

132

The proposed Action aims to improve performance at a lower cost through harmonisation and common activities of the “COOPANS

Build B2.5” system. Based on the COOPANS Build 2 system baseline, Build 2.5 is an evolution, specifically addressing the following areas of improvements at operational and technical level:•Improvedinterfacewithterminalunits•Improvedinterfacewithairports•Crossborderservicestoenableflexibleairspacemanagement•New surveillance technologywith enhanced air/ground interoper-ability

•Safety improvements and extension of support for situationalawarenessintheterminalarea

•Collaborativeresourceplanningatairports•InfrastructurearchitectureharmonisationforARTAS•Technicalextensionofsystemresourcecapabilities

The Action aims to develop the following 9 inter-dependent Centralised Services (CSs):•CS1‘FAS’:Flightplanandairportslotconsistencyservice•CS2‘4DPP’:4DTrajectorycalculationserviceforplanningpurposes•CS3‘ETKR’:Europeantrackerservice•CS4‘AFUAS’:Advancedflexibleuseofairspacesupportservice•CS5‘EAIMS’:EuropeanATMinformationmanagementservice•CS6‘CNR’:Managementofcommonnetworkresourcesservice•CS7‘NIPS’:Networkinfrastructureperformancemonitoringandanal-ysisservice

•CS8‘PENS’:Pan-Europeannetworkservices•CS9‘DCS’:Datacommunicationservice

The centralised provision of these ATM services will contribute to the overall service level improvement for the ultimate clients of the ATM network, the airspace users and, as a result, passengers and freight op-erators.

TheproposedAction is of limited relevance to the callforproposals.Maturityisconsideredsufficient,althoughit isdifficult toestimatethefeasibilityoftheproposedtimeframefortheimplementationoftheAction.Itfailsto demonstrate the anticipated socio-economic impactand environmental impact. The overall quality of theproposalispoor.

Implementation of harmonised functionality for COOPANS

Build 2.5

2012-EU-40007-P

Set-up of centralised services to contribute to SES performance

achievement

The proposed Action meets only partly the objec-tivesof thecall forproposalsas itensuresonlybroadrelevancetotheATMMasterPlan.Itisnotmatureenoughas commitment fromkey stakeholders ismissing. Thiswill jeopardisethe implementationofseveralactivities.Inaddition,theworkonseveraloftheproposedcentral-ised services gowell beyond 2015. The description ofimpact is good, albeit no case forwhether or not it isadvantageous to centralise certain services has beenmade.Theoverallqualityoftheproposalisgood.

2012-BE-40010-S

ATMMember States involved:Belgium

Applicant:EUROCONTROL

Requested fundingTotal eligible costs €56,805,949

TEN-T requested funding: €28,402,974.50

TEN-T funding: 50%

Recommended funding €0

ATMMember States involved:Austria, Italy, Sweden

Applicant:LFV

Requested fundingTotal eligible costs €7,072,778

TEN-T requested funding: €1,414,556

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

133

The proposed Action aims to contribute to the FAB CE’s objectives of capacity and efficiency increase as well as

an improvement of the cost effectiveness. Accordingly, the specific objectives for the project are:

•Establishmentofanimprovedinterfacebetweenen-route(freeroute)airspaceandthemajorairportsintheFABCEairspace(“Seamlessoperation”)

•Implementation of the enablerswithin the scope of theSESARInterimDeploymentPlan(IDP).

FAB Central Europe: pilot seamless operation

2012-EU-40013-S

TheproposedActionfailstodemonstrateitsrelevancetothecallforproposals.Itsmaturityisweakastherearerisksthatitsobjectiveswillnotbeachievedduetolatetiming.Itfailedtosubstantiatethepotentialimpact.ThequalityoftheproposedActionisweakandthedescrip-tionofactivitiescontainsinconsistencies.

COOPANS operational harmonisation study

The overall maturity of the proposed Action is verygood.However, it isof limited relevance to thecall forproposals.ThedescriptionofthepotentialimpactsoftheproposedAction is limited.Thequalityof theproposedActionisnotsufficientlygoodasitlacksclarityandstruc-ture.

For this project, three out of five ANSPs of the COOPANS partnership (ACG, IAA and LFV) will perform a study for the

next upgrade (Build 2.5) of the TopSky product. The study will include the definition, harmonisation and ordering the upgrade from the manufacturer.

2012-EU-40008-S

ATMMember States involved:Austria, Italy, Sweden

Applicant:LFV

Requested fundingTotal eligible costs €3,768,934

TEN-T requested funding: €1,884,467

TEN-T funding: 50%

Recommended funding €0

ATMMember States involved:Austria, Czech Republic, Hungary, Slovenia, SlovakiaApplicant:Austro Control Österreichische Gesellschaft für Zivilluftfahrt

Requested fundingTotal eligible costs €26,096,058

TEN-T requested funding: €13,048,029

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

134

TheaimoftheActionistoequiptheaerodromecontrolserv-ices of Budapest Liszt Ferenc International Airport with a

backuplocationorsystemforemergencysituations(naturaldis-asters, terrorattacks, technicalfailures)orduringtherenewalworksperiodoftheHungaroControlcontroltower,whentheAir-portwouldnotbeabletomaintaintheaerodromecontrolactivi-tiesandthemovementoftraffic.

Thecontingencyfacilitywillbeestablishedonthe2ndfloorofthenewlybuiltANSIIIbuilding,intheso-calledVirtualContingencyFacilityoperationsroom(VCF).Theimplementationisbasedontheduplicationofalltheairporttechnicalsystemsindependentofthecontroltowerbuilding-makingitpossibleforairtrafficcontrollers to provide service at a capacity which is normallyprovidedinlowvisibilityconditions.

In line with the requirements of EC Regulation 29/2009/EC and the FAB CE Free Move Scenario, the Action aims to

develop the Hungarian air traffic control system MATIAS (Mag-yar Automated and Integrated Air Traffic System) in order to fulfil the requirements relating to the CPDLC (Controller- Pilot Data Link Communication — the standard communication between the air traffic controller and the pilot through data link). As a result, MATIAS will secure the necessary and system-wide requirements of the FAB-CE Free Move Scenario, as well as realise the innovations needed for required aviation safety.

TheproposedActiondoesnotcomplywiththerequire-ments of the call for proposals as it is not a baselinedeployment area identified in the Interim DeploymentProgramme. Itsmaturity is insufficientas keyprepara-tory steps have not yet been fulfilled. The proposedAction fails to demonstrate to a satisfactory level theanticipated socio-economic effects. The descriptionsuffers froma lack of detailwhich lowers significantlythequalityoftheproposal.

rTWR - Development of remote (virtual) tower

2012-HU-40012-P

MATIAS Build 10, development of MATIAS air traffic control

system

Overall, theproposedAction isnot in linewith thecallforpropsoals.Itisfairlymature,however,thereisinsuf-ficientinformationavailabletojudgethematurityfromthe planning point of view. The impacts are describedinabriefandgenericmannersothatnosubstantiatedsocio-economicbenefitscanbeassumed.Ingeneral,theproposal suffers from the provision of insufficientrelevantinformation,whichleadstoalowoverallquality.

2012-HU-40011-P

ATMMember States involved:Hungary

Applicant:HungaroControl Hungarian Air Navigation Services PLC

Requested fundingTotal eligible costs €13,169,350

TEN-T requested funding: €2,633,870

TEN-T funding: 20%

Recommended funding €0

ATMMember States involved:Hungary

Applicant:HungaroControl Hungarian Air Navigation Services PLC

Requested fundingTotal eligible costs €7,796,312

TEN-T requested funding: €1,299,386

TEN-T funding: 16.67%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

135

The Global Project concerns the deployment of ETCS on all SNCB trains. The proposed Action aims to upgrade 64 and

retro-fit 21 coaches with ETCS to run on the Belgian and Lux-embourg network.

Theproposalconcernstheequipmentof10locomotives(5fittedand5retrofitted)with theETCSBaseline2release

2.3.0dandfuturebaseline3.xstandards.

Although the proposed Action is not part of a larger Global Project, it will contribute to better use of ERTMS equipped fleet on the ERTMS Corridor B in Austria.

ThematurityoftheproposedActionisverygoodasithasalreadystartedanditsimpactisalsogoodbyenablingcross-border traffic.However, the relevanceof thepro-posedActiontothecallforproposalscannotbeclearlyestablished as key information in that respect has notbeen provided. Furthermore, the poor quality of theproposal does not allow its full assessment. Crucialinformation is not included such as implementationtimingandstrategy,expecteddeliverables,etc.

The proposed Action addresses the objectives ofthe TEN-T policy and the call for proposals. It is alsomature as certain activities have already started. Theimpact of the proposal is very limited because of thesmall number of locomotives concerned by the Action.Moreover, the quality of the proposal is very poor asessential information about the implementation of theActionhasnotbeenprovided,includingdetaileddescrip-tionofitsactivities.

2012-BE-60024-P

ETCS installed on the pilot coaches type I11 and type M6

2012-AT-60001-P

ETCS onboard equipment of TX Logistik Austria AG locomotives to operate on ERTMS Corridor B

(ETCS-TXLA)

ERTMSMember States involved:Austria

Applicant:TX Logistik Austria GmbH

Requested fundingTotal eligible costs €2,915,750

TEN-T requested funding: €1,457,875

TEN-T funding: 50%

Recommended funding €0

ERTMSMember States involved:Belgium

Applicant:NMBS/SNCB

Requested fundingTotal eligible costs €17,367,000

TEN-T requested funding: €5,833,500

TEN-T funding: 33.59%

Recommended funding €0

136

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The purpose of the Action is to fit all Danish rolling stock for passenger services with ERTMS onboard equipment, together

with STM-DK to operate both on the existing ATC and planned ERTMS infrastructure on the conventional lines throughout Denmark.

The Action, implemented by Rail Net Denmark with Alstom as sup-plier, uses Danish passenger railway undertakings (onboard custom-ers) to fulfill passenger public service contracts. The aim is to prepare Danish rolling stock for the implementation of ERTMS Level 2 Base-line 3.0 infrastructure.

The retrofit of onboard equipment will be carried out by the following railway undertakings:

•63vehiclesbyDSB•7vehiclesbyRegionstogA/S•1vehiclebyNordjyskeJernbanerA/S

TheproposedActionfailedtodemonstratesufficientlyitsrelevancetothecallforproposalsasitmayconcernalsodevelopment of a Specific TransmissionModule (STM),whichisoutsidethescopeofthecall.TheActionisreadytostartbutsomepartsof itwillbecontinuingbeyond2015. The impact is mainly at national level. Finally,insufficient informationon theAction itselfunderminesthequalityoftheproposal.

2012-DK-60003-P

Implementation of ERTMS Baseline 3 on passenger rolling stock in Denmark - first of class

ERTMSMember States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested fundingTotal eligible costs €78,193,318

TEN-T requested funding: €39,096,659

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action concerns the retrofit of 81 existinglocomotives and the fitting of five new locomotiveswith

ETCS. Following the technical specifications, the locomotiveswillrunon7differentTEN-TPriorityProjects(PP1,PP5,PP6,PP17,PP22,PP23,PP24).

The proposed Action is highly relevant to the call forproposalsasitaddressesrailinteroperabilityatEUlevelthrough ERTMS deployment. The Action is expected tohave a good impact in terms of safety and interoper-ability. Although some preparatory steps have alreadybeentaken,thequalityoftheprovidedinformationdoesnotallowtoconcludeonkeyfeaturesoftheAction,suchas definition of subsystems, interoperability tests andcrossacceptance,thusunderminingthereadinessoftheActiontostart.

2012-DE-60010-P

Equipment of 86 freight locomo-tives with ETCS on-board-units

according to SRS 2.3.0d/ Baseline 3

ERTMSMember States involved:Germany

Applicant:Railpool GmbH

Requested fundingTotal eligible costs €12,650,000

TEN-T requested funding: €6,325,000

TEN-T funding: 50%

Recommended funding €0

137

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedActionfocusesontheretrofitting(ETCSBase-line2release2.3.0d)ofexistingTRAXXlocomotives(Bom-

bardierTransportation).The4applicants(MacquarieEuropeanRail Ltd, Beacon Rail Leasing Ltd, Alpha Trains LuxembourgsarlandRBSAssetFinanceEuropeLtd)proposethefollowingmaximumnumbersofvehiclesfortheapplication:23TRAXXAC1,53TRAXXAC2and10TRAXXMSlocomotives.Theywillbeusedonthefollowingrailfreightcorridorsorpartsthereof:

•Corridor1:Rhine-Alpcorridor(TEN-TPriorityProject24)•Corridor3:CentralNorth-Southcorridor•Corridor8:CentralEast-Westcorridor

Thequalityoftheproposalisgoodanditisrelevanttothecallforproposals.Itisexpectedthatitwillproducehigh impact on interoperability, competitiveness andmodalshift.However,itsmaturityisunderminedbylackof financial commitment and unachieved preparatorysteps. Moreover, there are some uncertainties wheth-er the results will be delivered within the timeframeproposed.

2012-EU-60004-P

Prototyping, testing, certifying and retrofitting of TRAXX locomo-tives to ETCS 2.3.0d / Baseline 3

ERTMSMember States involved:Luxembourg, United Kingdom

Applicant:Macquarie European Rail Limited (Luxembourg Branch)

Requested fundingTotal eligible costs €37,465,056

TEN-T requested funding: €6,450,000

TEN-T funding: 17.22%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The purpose of the Action is to fit the Contec Rail locomotives by designing, testing and roll-out of ETCS level 2 Baseline

2.30d onboard equipment on a limited number of trains (five) to test the integration between ETCS and the STM-DK module. Following the successful test of Baseline 2.3.0d and STM-DK will be the design, test and roll-out of ECTS level 2 Baseline 3.0 and STM-DK onboard system as first of class and serial installation.

TheproposedActionisrelevanttothecallforproposalsas it addresses deployment of ERTMSand is expectedto produce a positive impact on interoperability andsafetyaspects.However,thematurityoftheActionisnotdemonstratedas there isnoevidenceof theavailabil-ityofco-fundingpartsorofthetechnicalreadinessthatwouldallowtheActiontostart.Moreover,thequalityoftheproposalislowbecauseinformationprovidedmostlyrelatestotheGlobalProjectratherthantotheconcernedAction.

Upgrade or equipment of trains with Baseline 3

2012-DK-60026-P

ERTMSMember States involved:Denmark

Applicant:Contec Rail Aps

Requested fundingTotal eligible costs €1,114,472

TEN-T requested funding: €557,236

TEN-T funding: 50%

Recommended funding €0

138

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposal concerns testing (in accredited laboratoriesfollowed by on-site validation) of ERTMS on-board units

andlineequipmentonlevel1andlevel2lines.ItisapartofaGlobal Project that covers successful implementationof theprovisionsofthethirdMemorandumofUnderstanding(MoUof16April2012)signedbetweentheEuropeanCommissionandtheEuropeanrailassociationsinthefieldofERTMS.TheActionaimsatreducingtestingcostsusingaremotelabora-tory.

The proposed Action is relevant to the overall objec-tives of TEN-T Guidelines and the call for propos-als. In addition deliverables of the proposed Actionhave the potential to be used as a decision tool forfuture ERTMS deployment. Nevertheless, the proposedAction fails to demonstrate sufficient technical matu-rity so that it could start. The quality of the proposedAction is low and it lacks sufficient description ofactivities;noclearprojectmanagementplanisprovided.

2012-EU-60032-S

Facilitating and speeding up ERTMS interoperability

ERTMSMember States involved:Belgium, Germany, France, Italy, United Kingdom

Applicant:Multitel

Requested fundingTotal eligible costs €10,668,816

TEN-T requested funding: €5,334,408

TEN-T funding: 50%

Recommended funding €0

The Global Project addresses the ERTMS migration of the French high speed lines. The proposed Action concerns

studies to define new formal specifications for the trackside subsystem and the Radio Block Centre (RBC) modelling. The objective of the Action is to prepare the tender documents for the trackside ERTMS deployment on the French high speed lines.

Although the proposed Action is mature and ready tostart from a technical point of view, it is not relevanttothecallforproposalsasitisnotrelatedtothe2012ERTMS Memorandum of Understanding. Moreover, theimpact in terms of decision and policy making is notsubstantiated.Finally,thequalityispoorastheinforma-tion provided is not complete or fullymissing in someparts.

2012-FR-60017-S

Formalisation of the ERTMS standards for the HSL equipped

with TVM

ERTMSMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested fundingTotal eligible costs €4,013,756.33

TEN-T requested funding: €2,006,878.16

TEN-T funding: 50%

Recommended funding €0

139

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Theproposed—standalone—Actionconcernstheequip-ment with GSM-R and ETCS Level 2 baseline 2 of a

regional,singletrack84kmlongline,followedbytheupgradetobaseline3withlevelcrossingfunctionality.

TheproposedAction’s relevance to thecall forpropos-als ispoorascompatibility testsarenot included. It isnotmatureassomenecessaryapprovalshavenotyetbeenattributedandtheworksareexpectedtostartlateforthetimelineofthiscallforproposals.Moreover,theproposedAction—whichinvolvesaregionalstandaloneline—willhaveaverylimitedimpactoninteroperability.Thequalityispoor.

2012-IT-60029-P

Outfitting of rail lines, RFT and TFT rolling stock with ERTMS/

ETCS L2 and GSM-R (SST and SSB)

ERTMSMember States involved:Italy

Applicant:Rete Ferroviaria Toscana S.pA.

Requested fundingTotal eligible costs €21,255,550.99

TEN-T requested funding: €10,627,775.99

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposal concerns development of tools aiming at improving quality of tests of ERTMS equipment.

Itisapartofglobalprojectthatcoverssuccessfulimplemen-tationoftheprovisionsofthesecondMemorandumofUnder-standing(MoUof4July2008)signedbetweentheEuropeanCommissionandtheEuropeanRailwaysectorAssociationsinthefieldofERTMS.

TheActionaimsat facilitatingand consolidating theERTMSdeployment.

TheproposedActionfailstoaddresssufficientlythecallforproposalsasitsobjectivesarereferringtoonelabo-ratoryonly.Itdemonstratesappropriatematurityastheinitial specification documents were already producedandtheprojectisreadytostartfromthetechnicalpointof view. Nevertheless its impact is considered limitedto one Member State. The proposal’s overall quality,especiallyintermsofcompletenessandclarity,ispoor.

ERTMS data log analyser

2012-IT-60021-P

ERTMSMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €6,000,000

TEN-T requested funding: €3,000,000

TEN-T funding: 50%

Recommended funding €0

140

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Theproposed Action involves the implementation/upgradeofETCSforupto50DE6400locomotivestoenableopera-

tiononrailtracksequippedwithETCSandlegacyATPsystemsinBelgium,TheNetherlandsandGermany.

The relevance of the proposed Action is adequatelydemonstratedmeetingboth theTEN-Tpriorities (Prior-ityProject24)andthecallforproposal’sobjectives.Itspositiveimpactishightakingintoaccountthenumberoflocomotivesforeseenfor retrofit/upgradeand theearlyimplementation of the Baseline 3. The quality of theproposal isgood.However, theproposedActionfailstodemonstratesufficientmaturitysincethereisnoindica-tionon the timingofcontractualproceduresnecessaryfortheActiontostart.

2012-NL-60007-P

Retrofitting & upgrading diesel vehicles; developing on board unit software and

specific vehicle implementation designs, prototyping, testing, certifying and

installation works

ERTMSMember States involved:The Netherlands

Applicant:DB Schenker Rail Nederland NV

Requested fundingTotal eligible costs €16,614,000

TEN-T requested funding: €7,087,000

TEN-T funding: 42.66%

Recommended funding €0

The Global Project consists of the modernisation of the106 railway line on the Psary-Starzyny-Kozłów-Kraków

section. The proposed Action aims at deploying ERTMS L1on two railway lines (Psary-Starzyny and Starzyny-Kozłów),totallingabout36km.

TheproposedActionaddressesPriority2ofthecallforproposalsandisthereforeconsideredrelevant.Itsmatu-rityisquestionableastheworkswillonlystartverylatefor the timing of this call for proposals. The proposedAction’s impact is not adequately documented andoverall limited due to the relative small size of theproposedAction.Theoverallproposalisofgoodquality.

2012-PL-60031-P

Deployment of ERTMS/ETCS level 1 in railway lines 570 and 64 on the Psary-Kozłów section

ERTMSMember States involved:Poland

Applicant:PKP Polskie Linie Kolejowe S.A.

Requested fundingTotal eligible costs €2,312,370

TEN-T requested funding: €1,156,185

TEN-T funding: 50%

Recommended funding €0

141

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

STM - Smart Traffic Management

TheproposedAction isof low relevance to thecall forproposals.WhilstittakesastagedapproachfromreviewofstateoftheartacrossEurope,optimisationofinfor-mation,pilottestingatselectedsites,andpan-Europeandisseminationofresults,itremainslimitedtointhedo-mainsitcovers:usingITSforprovisionofinformationonsafetyunderadverseweatherconditions;environmentalemissionscontrolandtrafficcontrolduringpeakseasonalevents.Theproposalfailstodetailhowtheoutputswillbeimplementedonawiderscale,thusunderminingtheimpactoftheAction.Thematurityisnotdemonstratedandthequalityoftheproposalislow.

TheSmartTrafficManagement(STM)projectinSpainaimsto:

•DevelopITSsolutions,coordinatedataEuropeanlevel,forcommonproblemsontheTEN-Troadnetwork,particularlyinfieldslackingofahomogeneousapproach.

•SupporttheimplementationofITSsolutionsunderadverseweathersolutions, looking to improve road safety bymeans of control ofweathervariablesandtheirincidenceinfrictioncoefficients.

•Generaliseasystemforroadtrafficemissioncontrolandtrafficman-agementtoreducetheenvironmentalimpactofroadtraffic.

•Stimulatetheprovisionofaddedvalueandhighqualityinformationtoroaduserswithspecialsensitiveness,suchaslargetrafficflowsontheSpanishroadnetworkcomingfromnorthernEuropeancountries(i.e.France,Belgium)tonorthernAfricaduringsummertime.

2012-ES-50011-S

ITS-EETSMember States involved:Spain

Applicant:Asociación Española de la Carretera (AEC)

Requested fundingTotal eligible costs €1,883,200

TEN-T requested funding: €941,600

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The Global Project addresses the ERTM trackside andon-board deployment along Corridor E (Dresden-Prague-

Vienna/Bratislava-Budapest-Bucharest-Constanta). The pro-posedActionaimsatconductingapreparatorystudyontheimplementation of ERTMS on several Slovakian sections ofCorridorE.

TheproposedActionisverymatureandits impactandquality are satisfactory. However, being a preparatorystudy,whichdoesnotdirectly leadto the implementa-tionofworksunderminesitsrelevancetoPriorityArea2oftheERTMScallforproposals.

ERTMS deployment on Slovak part of Corridor E: state border CZ/SK–Kúty–junction Bratislava–Rusovce–

state border SK/HU

2012-SK-60030-S

ERTMSMember States involved:Slovakia

Applicant:Ministry of Transport, Construction and Re-gional Development

Requested fundingTotal eligible costs €3,492,200

TEN-T requested funding: €1,746,100

TEN-T funding: 50%

Recommended funding €0

142

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

ThisAction,which includesTEN-T roadoperator inNordiccountriesandnorthernGermany,intendstodelivertravel-

lerinformationandtrafficmanagementservicesontheNordicTriangleandthesurroundingroadnetwork.Theobjectiveistopioneertheestablishmentofacross-borderinformationnet-workandestablishinteroperablecoreEuropeanITSservices.Insupportoftheserviceprovision,theprojectwillcarryoutITSdeploymentandrelatedICTinfrastructure.

TheproposedActionisrelevanttothecallforpropsoals.However, it fails todemonstrateco-ordinationbetweentheapplicantsandlacksaconcertedcorridorapproach.Additionally,thecross-borderelementisnotsufficientlysubstantiated.Althoughithasalreadystarted,thereareconcernsaboutitsmaturityduetothegapsinthetime-line,theconsistencyofthespecifictaskstobeexecutedandthefactthattheprojecthasnotyetbeenendorsedbyakeyparticipant’sMemberState.Positivesocio-eco-nomiceffectscouldbeanticipatedbutthesearenotsuf-ficientlysubstantiated.Thequalityoftheproposalislowwithimportantelementsmissing.

2012-EU-50001-P

NEXT-ITS – ITS on the Extended Nordic Triangle

ITS-EETSMember States involved:Sweden, Germany, Denmark, Finland

Applicant:Swedish Ministry of Enterprise, Energy and Com-munications / Swedish Transport Administration

Requested fundingTotal eligible costs €134,427,000

TEN-T requested funding: €26,885,400

TEN-T funding: 20%

Recommended funding €0

GeoToll Pay

TheproposedAction’s relevance to thecall forpropos-alsismodestasitdoesnottakeintoaccountfullytheEuropean policy context and barriers to pan-Europeandeployment. Whilst it is technically mature and hasformalpoliticalapproval, its likely impact isvery local-ised.ItsqualityislowintermsofachievingtheproposedAction’sobjectivesandnotsufficientlyspecifiedtoguar-anteeeffectivetechnicaldeliveryofitsprojectetoutputs.

The Global Project, of which this Action is part, concen-tratesontheimplementationofasystemofelectronictoll

collection via mobile devices in Portugal. The two-phaseGlobal Project includes a feasibility system implementationanalysis(study)andsystemimplementation(works).

The proposed Action, the Global Project’s first phase, is astudy which should allow the feasibility assessment of theimplementation. Itwill lookat thefollowingelementswhichwillbepartofthesystem:routeidentificationandcalculationmethod,billing/paymentmethod,technologicalinfrastructureperformance/behaviour and ease/convenience of mobiledevicesfortollpayment.

2012-EU-50002-S

ITS-EETSMember States involved:Portugal, Spain

Applicant:DGAE - Direção-Geral das Atividades Económicas (Ministério da Economia e do Emprego)

Requested fundingTotal eligible costs €325,344

TEN-T requested funding: €162,672

TEN-T funding: 50%

Recommended funding €0

143

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Arc Atlantique Traffic Management Corridor

The proposed Action addresses the call priority fordeploymentinaregionalcorridoroftrafficmanagementservices. However, coordinated and focused roll-out ofthe core services is not sufficiently demonstrated. TheproposedAction ismatureandhasgood impact.How-ever,thequalityoftheproposedActionislowanditdoesnot provide a convincing case to ensure a harmonisedapproach.

The Action concerns studies and works in the fields oftrafficmanagement(TM)andsupportingsystems.Bringing

together fiveMember States and 10 national/regional roadauthorities, theActionaimstodevelopharmonisednationalandcross-borderTMplansandimplement interoperableITSdeploymentsinfourapplicationareas:improvedtrafficcontrolsystems,extendedTMmeasures,HGVservicemanagement,TMinformation.

2012-EU-50004-P

ITS-EETSMember States involved:Spain, France, Ireland, Portugal, United King-dom

Applicant:UK Department for Transport

Requested fundingTotal eligible costs €190,229,433.77

TEN-T requested funding: €38,045,886.75

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The CITIES+ partners aim at deploying strategic ITS services to enhance interfaces between urban/interurban networks and TEN-

T roads. Truly devoted to reduce bottlenecks, these implementations have been selected during the elaboration phase with regard to their compliance with the TEN-T call, their impact on traffic fluidity and the potential for replication. When appropriate, the CITIES+ partners will take existing ITS standards such as DATEX2, Mare Nostrum and the EasyWay 2012 Deployment Guidelines into account in order to foster interoperability and service harmonisation on crucial stretches. Interactions and collaborations should be considered in addition to the scope of road network since public transport and other alleviating measures such as buses and High Occupancy Vehicles (HOV) lanes, traffic management for large events or integrated and/or connected traveller information services.

TheproposedAction is relevant to the call for propos-alsasitaddressesoneoftheimportantdomainsofITS,namelytheurban/inter-urbaninterface.ThematurityoftheproposedAction isgoodas it is ready tostartandhasalreadypartiallystartedsomedeploymentactivities;nationalpoliticalcommitmentisevidencedandfinancialresourcesarecommitted.However,theconcreteimpactsarepoorastheinvolvementoftherelevantstakeholdersisnotdemonstrated.Thequalityislow.

2012-EU-50003-P

CITIES+

ITS-EETSMember States involved:Spain, Belgium, Germany, France, Italy, The Netherlands

Applicant:Dirección General de Tráfico

Requested fundingTotal eligible costs €58,250,500

TEN-T requested funding: €11,650,100

TEN-T funding: 20%

Recommended funding €0

144

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheActionaimstoimprovecross-bordertrafficandtrans-port through harmonised and synchronised deployment

of ITS applications on the high level road network of eightMember States. The applications relate to traffic manage-ment and traveller information services including safetycriticalroadservices,trafficstatusinformationandtruckpark-ing availability. TheAction also aims to foster the develop-mentofcross-bordertrafficmanagementplans.Theproposalcoversfourworksactivitiesonharmonisation,datacollectionandprocessing,dataexchange,andservicedelivery—withtheprimaryfocusbeingdatacollection.

TheproposedActionisrelevanttothecallorproposalsandtheobjectivesoftheITSDirective.However,itisnotsufficientlymatureduetorisksofaninstitutionalnature.Thepotentialimpactisweak.Intermsofquality,thepro-posedAction ispoorlydescribedandthedescriptionofactivitiesisinsufficientlydetailed.

2012-EU-50006-P

CROCODILE

ITS-EETSMember States involved:Austria, Czech Republic, Germany, Hungary, Italy, Romania, Slovenia, SlovakiaApplicant:Bundesministerim für Verkehr, Innovation und Technologie (AT)

Requested fundingTotal eligible costs €148,772,500

TEN-T requested funding: €29,754,500

TEN-T funding: 20%

Recommended funding €0

MAGNA GRAECIA

The proposed Action’s relevance is good even thoughitfailstoaddressthespecificobjectivesofthecallforproposals.TheproposedAction is immature,no formalendorsementisprovidedbytwoinvolvedMemberStates,nor support by key stakeholders. The socio-economicimpactisverygenericandnotsufficientlydetailed.Thequality of the proposed Action isweakened by lack ofdetaileddescriptionandconsistencybetweentheactivi-tiesandobjectives.

The proposal objective is to provide traffic and travel information and traffic management services to end users

at the same level and quality in Italy, Greece and Cyprus by means of website, VMS, FM radio, navigation services or pos-sible mobile applications. All systems will be harmonising the information based on DGs and will make it available to end users by a common information platform and signals.

2012-EU-50007-P

ITS-EETSMember States involved:Greece, Italy, Cyprus

Applicant:Greek Ministry of Development, Competitiveness, Infrastructure, Transport and Networks (General Secretary of Public Works)

Requested fundingTotal eligible costs €7,930,000

TEN-T requested funding: €1,586,000

TEN-T funding: 20%

Recommended funding €0

145

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Chameleon

TheproposedAction ishighly relevantand in linewiththecallforproposals.Whilstithasalreadystarted,itismissingarealistictimelinewithastrategicroll-outplan.TheproposedActionhasthepotentialtomakeavaluablecontributiontotheroll-outofEuropeancoreservicesandtheDeploymentGuidelinesandSpecifications.However,this is not sufficiently demonstrated. Additionally, theunbalanced participation of key stakeholders and thelackofsubstantiationofthecontinuityofservicesraiseconcernsaboutitsimpact.Overallthequalityispoor.

The proposal, including five Member States (Austria,Switzerland,Germany,France,Italy,TheNetherlands)and

Switzerland, aims to fill the identified gaps in traffic man-agement measures on a corridor area ranging from TheNetherlands (regionofRotterdam) to Italy,develop interna-tionaltrafficmanagementplansandprovideanopentravellerinformationplatform.

2012-EU-50010-P

ITS-EETSMember States involved:Germany, Austria, France, Italy, The NetherlandsApplicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung (DE)

Requested fundingTotal eligible costs €183,098,508

TEN-T requested funding: €36,619,702

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The Action proposes to deliver a coordinated deployment of 18 traveller information services (including one at a cross-

border section) and nine travel time services (two at cross-border sections) on a 13,000 km route on the Mediterranean Corridor connecting the road networks of France, Spain, Italy and Portugal.

TheproposedActionisrelevanttothecallforproposalsand is techinically and financiallymature as it has allthenecessarysupport.Thepotentialimpactsareunder-mined by failing to demonstrate any overarching logicto the integrationof thespecificplanneddeployments.Intermsofquality,theactivitiesarenotclearlydefinedand it fails to demonstrate the European added valuethrough its execution. The proposed corridors are notsufficiently defined and whilst it includes three cross-bordersections,amoreinclusiveandtargetedselectionofcrossbordersectionsalong theproposedcorridor ismissing.

2012-EU-50008-P

MedTIS

ITS-EETSMember States involved:France, Spain, Italy, Portugal

Applicant:Association des sociétés françaises d’autoroutes (ASFA)

Requested fundingTotal eligible costs €164,150,500

TEN-T requested funding: €32,830,100

TEN-T funding: 20%

Recommended funding €0

146

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Corridor du Soleil is a deployment project aiming to imple-ment traffic management services on a north-south TEN-

T road axis from Amsterdam to Nice, passing through The Netherlands, Belgium and France. It aims at:

•Optimising the existing infrastructure capacity and effi-ciencyonsensitive roadsegments,namelyon roadnet-worksuptosemi-urbanareasandcongestedhotspots.

•Improving the safety and reliability with deployment ofsafety measures and supporting systems at criticalhotspotsandatbottlenecks.

TheproposedActionisonlybroadlyrelevanttothecallforproposaIsismaturealthoughimportantcommitmentfromthecitiesinvolvedisnotprovided.TheinvolvementandroleoftheprivatesectortorolloutcoordinatedITSservicesisnotsubstantiated.Thepotentialimpactislowandnotsufficientlyjustifiedintermsoftraffic,environ-ment,regionaldevelopmentandlanduse.Thequalityispoorasitfallsshortofdemonstratinghowaseamlessandcontinuousservicewillbedelivered.

2012-EU-50012-P

Corridor du Soleil

ITS-EETSMember States involved:France, Belgium, The Netherlands

Applicant:Ministère de l’écologie, du développement-durable et de l’énergie (FR)

Requested fundingTotal eligible costs €97,854,000

TEN-T requested funding: €19,570,800

TEN-T funding: 20%

Recommended funding €0

Forcing a breakthrough for use of LNG in maritime shipping

The proposed Action is mature and of good quality.Although theAction representsagood initiative, ithasgot limited relevance to the call for proposals, as it isconsidered a commercial case only for one port andoneprivatemaritimeoperator,withoutwider relevanceto MoS, thus undermining its relevance. The potentialimpactsoftheActionarenotdemonstratedorsubstanti-ated.

TheActionaimstobreakthedeadlockofusingLNGasamarinefuel,byco-developingdemandandsupply,toiniti-

ateitsuse.AnthonyVeder(NL)isbuildingtwonewsea-goingLiquefied Ethylene Gas carriers powered by LNG for SABIC(SittardNL/TeesportUK).ThesecarrierswilltransportethylenefromSABIC’splantinTeesport(UK)toclientsintheSECAarea,andthuscreatingademandinalloftheseports.

Chive Fuels (UK) will co-develop a LNG bunker facility at Teesport, in order to overcome the problem linked to the avail-ability of LNG as a bunker fuel.

2012-EU-21004-P • Part of Priority Project 21

MoSMember States involved:The Netherlands, United Kingdom

Applicant:Anthony Veder Rederijzaken B.V.

Requested fundingTotal eligible costs €12,389,958

TEN-T requested funding: €3,746,947

TEN-T funding: 30.24%

Recommended funding €0

147

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

LNG in Baltic and Black Sea Ports

TheproposedActionisrelevanttothecallforproposalsandthoughtechnicallyitisreadytostartthisissubjecttootherexternalparametersthatmayhavean impacton the implementation timeline. The proposed Actionfails to demonstrate its impact as a decision or policymakingtool.Therearesignificantweaknessesconcern-ingthequalityoftheproposedActionrelatedtothelackofdetailedinformationandclarity.

2012-EU-21012-S • Part of Priority Project 21

The key idea behind this project proposal is to provide the effec-tive and successful implementation of the Motorways of the Sea

in the Baltic and Black Sea regions. The Action is composed of six activities with the main goal to initiate the planning and safety proce-dures, related to the development of LNG infrastructure in the Baltic Sea ports (Trelleborg, Sundsvall, Gdańsk/Gdynia), so that the number of Baltic ports planning the LNG infrastructure will be enlarged, thus creating a network of LNG ports in the region. The planning procedures will also be initiated in another two ports (Burgas, Varna) in the southeastern part of the EU.

The major expected result is the development of a platform, knowl-edge transfer and close cooperation between the in terms of LNG more experienced Baltic Sea and less advanced Black Sea regions.

MoSMember States involved:Sweden, Bulgaria, Poland

Applicant:Trelleborgs Hamn AB

Requested fundingTotal eligible costs €1,156,539.58

TEN-T requested funding: €485,941

TEN-T funding: 42.02%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The Action refers to research studies which will focus on the technical solutions and environmental and cost saving is-

sues for the development of a waterborne transport system that connects short sea shipping with Inland Waterway Shipping and has an independent ice navigation capability without icebreaker assistance.

The intermodal system is expected to be suitable for short sea shipping in the Baltic Sea Motorway on frozen sea routes, as well as for frozen northern European inland waterways.

TheproposedActionhasalowrelevancetothecallforproposalsasitfocusesonresearchrelatedactivitiesthatfalloutsidethescopeofMoS.ThematurityoftheActionissufficient.However,theproposalfailstodemonstrateits impacts as a future decision-making tool and as apolicymakingtool.Theproposalisofpoorqualityasitlacksacoherentapproachinitsstructureandobjectivesandfailstoprovidedetaileddescriptionofitsactivities.

2012-EU-21005-S • Part of Priority Project 21

Towards Round-the-Year Winter Navigation without Icebreaking

Assistance (TRYNICE)

MoSMember States involved:Finland, Estonia

Applicant:VTT Technical Research Centre of Finland

Requested fundingTotal eligible costs €1,163,090

TEN-T requested funding: €581,545

TEN-T funding: 50%

Recommended funding €0

148

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The ATLANTICA OPTIMoSTerminals implementation project which aims to optimise port operations by developing infrastruc-

ture and facilities “ad hoc” to provide efficiency in a “door to door” approach of the MoS service for maximum efficiency and com-petitiveness. In 2009, the Spanish-French Intergovernmental Commission selected two projects: Gijon-St Nazaire and Vigo-Nantes (extended to Le Havre and Algeciras).

ATLANTICA MoS was established in 2009, without having entered into service, both countries governments and the ports involved bets to launch its beginning, which is forecasted before the end of 2013 and thus to provide a high quality service, alternative to the road in freight transport. OPTIMoSTerminalsisasetoftwoimplementationprojectstooptimiseMoSportterminals.BothworksarecompletelyindependentoftheotherbutthetwotogetherwillimproveefficiencyandqualityofMoSservicesinports.

The proposed Action is not relevant to the call forproposalsas there isnomaritimeservicebetween thetwoportsinvolved.Noristhereanyevidencethatamari-timelinkwillbeestablished.Someoftheproposedactiv-itesarematurebutothersarenot.Thepotentialimpactisnotdemonstrated.Thereisnomarketanalysisorotherevidencesubstantiatingtheexpectedtrafficgrowthandnoinvolvementofamaritimeoperator.Thequalityoftheproposalisweak.

2012-EU-21014-P • Part of Priority Project 21

ATLANTICA OPTIMoSTerminals

MoSMember States involved:Spain, France

Applicant:Organismo Público Puertos del Estado

Requested fundingTotal eligible costs €18,408,028

TEN-T requested funding: €3,681,606

TEN-T funding: 20%

Recommended funding €0

Magellano 2020 – green incentives for MoS based

corridors

The proposed Action only broadly addresses therequirements of the call for proposals in terms ofrelevance.Itismature,howeverthelackoftheappropriatebeneficiariesinallproposedpilotactionsisanissue.Theimpactshavenotbeenproperlypresentedandquantified.Intermsofquality, it isambiguous in itsstructureandlacksamethodologicalapproachforitsimplementation.Theinterrelationbetweenthepilotactions,theactivitiesandtheobjectivesoftheActionisnotdemonstrated.

The strategic goal of the Action is to develop a new approach towards a full implementation of a pan-European green cost-efficient incentive scheme

for MoS-based cargo corridors for a clean and environmental friendly logis-tics industry. Different schemes will be included in the same methodological framework, attracting stakeholders and creating expectations and consensus — with a considerable focus and effort in terms of communication and capi-talisation. The Action aims to:

•Defineacommontrans-Europeanconceptualapproachtogreenincen-tivestobeappliedinthedifferentcontexts.

•Implement,demonstrateandevaluatethreepilotsonMoS-basedinter-modalcorridorsintheEU:Mediterranean,AtlanticandBaltic

•Startupaparticipatoryandconsensusbuildingapproachwithhighlevelexpertstakeholdersandshareholders

•Create expectations and consensus, and disseminate/exploit themainmessagescomingfromtheAction.

2012-EU-21015-S • Part of Priority Project 21

MoSMember States involved:Italy, Spain, Finland

Applicant:Rete Autostrade Mediterranee S.p.A.

Requested fundingTotal eligible costs €3,547,012

TEN-T requested funding: €1,773,506

TEN-T funding: 50%

Recommended funding €0

149

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TrainMoS 2

TheproposedAction ismatureandrelevant to thecallfor proposals as a wider benefit action focusing oneducationalaspectsofLNGbunkering.Howeveritlacksconvincingargumentationregardingitsimpactintermsof decision and policy making tools. The quality hasserious deficiencies as the proposed Action does notfollowtheInternationalMaritimeOrganisationguidelinesformaritimecoursedevelopment.

2012-EU-21018-S • Part of Priority Project 21

TrainMoS 2 is a wider benefit Action introducing the humanelementinMotorwaysoftheSeabyestablishingaknowledge

platformandasetofuniversityandvocationalcoursesfocusingonLNGbunkering.Thespecifictoolsthatwillbedevelopedare:

•AsetofLNGpostgraduateuniversitycourses•AsetofprofessionaltrainingsinfiveEUcities•Crossfertilisationactivities(onsitededicatedvisitsrelatedtoLNGbestpractice)

•A set of LNG vocational educational activities (in ports/onboard)

•An enlarged LMS platform including mobile phone/tabletapplications

•AnenlargedLNGcontentofawebportal

MoSMember States involved:United Kingdom, Greece, Spain, Italy, Poland, PortugalApplicant:University of Strathclyde

Requested fundingTotal eligible costs €2,548,696

TEN-T requested funding: €1,274,348

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action will improve capacity, productivity and environmental performance of the Trelleborg-Swinoujscie mari-

time link. It will contribute to sustaining the competitiveness and attractiveness of related multi-modal and international transport chains linking the Nordic and continental European countries.

In regards to Eastern European related traffic development, i.e. those connected to the pre-defined TEN-T corridor 1 between Southern Sweden and Poland have experienced a strong growth over the last few years (+14% per year since 2007). The proposed Action will ensure adequate maritime capacity and efficiency to sus-tain this freight transport demand. In particular, unitised cargo traffic on routes between Scandinavia and Eastern/Central/ Southeast Europe have large growth potential — also as intermodal transport. Activities involve maritime access, on-shore power supply, intermodal capacity, IT tools and a market study.

PartoftheactivitiesoftheproposedActionarealreadyco-financed by the EU. The remaining activities are oflowrelevancetothecallforproposals.Itisverymatureas activities have alread started or are ready to start.Theimpactislimitedanddoesnotappeartobesignifi-cant.Thequalityisweakinparticularregardingprojectmanagementaspects.

2012-EU-21016-P • Part of Priority Project 21

Improvement of multi-modal transport and sea-based link

Swinoujscie-Trelleborg

MoSMember States involved:Sweden, Poland

Applicant:Trelleborgs Hamn AB

Requested fundingTotal eligible costs €22,996,742

TEN-T requested funding: €4,543,670

TEN-T funding: 19.76%

Recommended funding €0

150

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action aims at enabling the supply of LNG from the Tornio import terminal, located between Finland and Sweden, to

multimodal satellite terminals at the Bay of Bothnia and facilitate the uptake of LNG in maritime transport. The Action aims at support-ing the development of cleaner and economically viable transport of North Scandinavian raw materials and industrial products to Euro-pean and international markets. The main components are the ongo-ing pre-investment studies for the construction of the LNG import terminal in the port of Tornio, conceptual and basic design of a new 1A super ice-strengthened LNG import tanker, establishment of bun-kering and multimodal reloading facilities at the Tornio-Haparanda multimodal LNG terminal, as well as the multimodal satellite ter-minal in Raahe, at the Bay of Bothnia. The Bothnian LNG transport infrastructure will be piloted through bunkering exercises in a small number of ports.

The impactof theproposedAction isgood.Whilst it isrelevant from a policy perspective, it is not sufficient-ly relevant to the specifics of the call for proposals.Moreover,theinterdependencybetweenworksandstud-ies within the same Action undermine significantly itsmaturity.Significantstepsneedtobecompletedbeforeit can be considered sufficientlymature. The quality isnotsatisfactoryasthedescriptionlackstechnicaldetails.

2012-EU-21022-P • Part of Priority Project 21

BothniaLNG

MoSMember States involved:Finland, Sweden

Applicant:The Baltic Institute of Finland

Requested fundingTotal eligible costs €51,124,600

TEN-T requested funding: €15,103,050

TEN-T funding: 29.54%

Recommended funding €0

SEAPLANES-SEE: Seaplanes dossier and tender for South-

east Europe operations

The proposed Action is not relevant to the call forproposals as itwill not lead to concentration of trafficflows onmaritime based logistical routes. There is noevidenceofquantifiablesocio-economicimpactatmacrolevel. It isnotmature,there isnoevidenceofcommit-mentsfortheintroductionofseaplanesintheregion.TheActionisacommercialventure.Overallthequalityisveryweak.Theproposalisnotcoherent,itsactivitiesarenotsufficientlydescribed.

SEAPLANE-SEE foresees to deliver a “complete tenderdossier” (study) addressed to (and of practical use by)

“investors”andtheEuropeanInvestmentBank(EIB),towardsinitiating a profitable business in 2015 on SEE seaplaneoperations (Adriatic & East Mediterranean Continuum). TheAction addresses issues of wider benefit for MoS linked toseaplaneoperationsinSEE,presentsamatureMoSseaplaneprogrammereadyfor fundingby investors,and releasesaninternationaltenderforinvestors(consortia,PPP).

2012-EU-21024-S • Part of Priority Project 21

MoSMember States involved:Greece, Italy

Applicant:Epsilon International SA.

Requested fundingTotal eligible costs €1,660,000

TEN-T requested funding: €830,000

TEN-T funding: 50%

Recommended funding €0

151

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

The proposed Action continues previous measures tocomplete the Global Project (Priority Project 17) on the

Munich-Bratislavasub-section.

Itwill tackletheconnectionHubertendorf–Blindenmarkt (viaBurgstallertunnel), which is one of the remaining works tocomplete theYbbs-Amstettenstretch. Itaims to removeanidentifiedbottlenecktoenableaconsistent,four-trackopera-tionrequiredononeofthemostimportantsubsectionsalongPriorityProject17,Wels-Vienna.

PP17: Austrian part in sub-section Munich–Salzburg, Salzburg–Vienna, Vienna–Bratislava - gap closure be-tween Hubertendorf and Blindenmarkt (via Burgstall-ertunnel) to enable the required four-track operation

for Ybbs–Amstetten

2012-AT-17034-P • Part of Priority Project 17

PPs - New ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested fundingTotal eligible costs €67,848,931.34

TEN-T requested funding: €13,569,786.27

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedActionisrelevanttothecallforproposalsasitaddressesamissinglinkonthePriorityProject17.Itsmainstrengthis itsmaturityastheimplementationhasalreadystarted.Intermsofimpact,theeliminationof the bottleneck on the respective sectionwill enableobtainingfullsocio-economicbenefitsfromtheimprovedtrafficcapacityofthewholeaxis.Theoverallqualityoftheproposal is good.However, taking intoaccount thescarcityoffundsandinlinewiththecallpriorities,sup-porttothisActionwouldnotoptimisetheeffectivenessoftheTEN-Tfunding.

TheproposedAction ispartoftheGlobalProjectwhich isthe development of the Austrian part of Priority Project

17,RailwayaxisParis-Strasbourg-Stuttgart-Wien-Bratislava.It includes design studies leading to the implementation ofthemissinglinkSalzburg-Steindorf/Straßwalchen.

PP17: Austrian part in sub-section Munich–Salzburg, Salzburg–Vienna, Vienna–Bratislava - design study leading to and Environmental Impact Assessment necessary for the implementation of the Salzburg-

Steindorf/Straßwalchen gap closure

2012-AT-17100-S • Part of Priority Project 17

PPs - New ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested fundingTotal eligible costs €8,581,400

TEN-T requested funding: €4,290,700

TEN-T funding: 50%

Recommended funding €0

152

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action is very relevant to the call forproposals since it aims to improve the capacity on asectionofPriorityProject17.However,theActionisnotmatureenoughasitisnotreadytostartfromtechnicalpointofview.TheimpactoftheActionhasnotbeendemon-strated.Moreover,thequalityoftheproposalisonlyfairasessentialinformationwasnotprovided.

Theproposalconcernstheupgradingofa+/-4.5kmrail-waysectionbetweenViennaStadlauandViennaAspern.

It is part of theGlobal Project for theupgrade toadoubletrackelectrifiedlineonthenorthernsectionofPriorityProject17 (Vienna–Slovak border). The proposedworks, which aimtoincreasethecapacity,safetyandservicequalityalongtheline,arepreliminaryconstructionmeasuresandconstructionofretainingwallsforthenewrailwayembankment.

Upgrading Wien-Stadlau – Wien-Aspern

2012-AT-17108-P • Part of Priority Project 17

PPs - New ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested fundingTotal eligible costs €25,252,000

TEN-T requested funding: €5,050,400

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedActionisrelevantasitaimsatremovinganexistingbottleneckthusimprovingthecapacityofPriorityProject17.TheActionisverymaturesincetheworkshavealreadystarted.Therearesocio-economicimpactsthroughtraveltimesavings.Thequalityoftheproposalisgood.However,takingintoaccountthescarcityoffundsandinlinewiththecall’spriorities,supporttothisActionwouldnotoptimisetheeffectivenessoftheTEN-Tfunding.

TheproposalconcernstheintegrationofthreerailwaylinesoftheFreilassing-Salzburgcross-bordersectionintoSalz-

burg’smaintrainstation.TheActionaimstoeliminateabottle-neck,thusprovidingadequateinfrastructurefortheincreasedcapacityrequirementsalongPriorityProject17,RailwayaxisParis-Strasbourg-Stuttgart-Wien-Bratislava.TheworksconsistoftrackandplatformconstructionwiththenecessarysignallingadjustmentsintheSalzburgstationarea.

PP17: Austrian part in sub-section Munich–Salz-burg, Salzburg–Vienna, Vienna–Bratislava -

integration of the three tracks from Freilassing–Salzburg into Salzburg Main Station

2012-AT-17106-P • Part of Priority Project 17

PPs - New ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested fundingTotal eligible costs €108,915,300

TEN-T requested funding: €21,783,060

TEN-T funding: 20%

Recommended funding €0

153

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedAction is relevant to the call for propos-als, has started and is of good quality. However, itscomparativeEUaddedvalueislowbecauseofthelocaldimensionofworks.Moreover,itisclosetothebordersbut no significant impact is expected until it becomesalsoapriorityfortheneighbouringMemberStates.

The Action concerns works to modernise and increase the capacity of railway lines 15 and 19 of the Belgian part of

the Iron Rhine, from the Dutch-Belgian border (Hamont) to Lier. The following works are foreseen:

•Conversionoftherailwayconfigurationandinstallationofpassingtrack/looplineforfreighttrainsinNeerpelt

•Eliminationoflevelcrossings61bisinNeerpeltand62inOverpelt

•Electrificationworksonline15Herentals-Mol•WorkstoenablethecommissioningoftheHamontstop-pingpoint

•Renewalofoutdatedsignallinginstallations

Works for Rail Freight Corridor 8 in Belgium: electrification works Herentals-Mol, transformation track configuration Neerpelt, re-opening the train

stop at Hamont, upgrading existing signalling technology

2012-BE-24103-P • Part of Priority Project 24

PPs - New ActionMember States involved:Belgium

Applicant:Infrabel SA

Requested fundingTotal eligible costs €40,220,027.26

TEN-T requested funding: €8,044,005.46

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action is mature and of good quality.However,itisnotrelevanttothecallforproposalsasitspredominant part concerns train stations therefore theremainderoftheActionisoflimitedEUadedvalue.

This Action concerns the first phase of the works to elimi-nate a bottleneck on the section between Watermael

station and the Louvain-la-Neuve junction, part of PriorityProject28,“Eurocaprail” on the Brussels-Luxembourg-Strasbourg railway axis.

Theworksinclude:•Wideningtherailplatform,adaptingand/or renewingtheengi-neeringstructuresfromWatermael-BoitsforttoOttignies

•Redeveloping the stations and stops at Watermael, Boitsfort,Groenendael,Hoeilaart,LaHulpe,Genval,Rixensart,ProfondsartandOttignies

•Finishingworks•InstallingenvironmentalequipmentalongthelinesL161,L161A

Increasing the number of tracks to 4 on the 161 line

between Watermael and the Louvain-la-Neuve junction

2012-BE-28102-P • Part of Priority Project 28

PPs - New ActionMember States involved:Belgium

Applicant:Infrabel SA

Requested fundingTotal eligible costs €259,581,686.58

TEN-T requested funding: €51,916,339.32

TEN-T funding: 20%

Recommended funding €0

154

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedAction is relevant to the call for propos-als, of good quality and significant expected imapct.However,interdependencyofworksandstudiesimplyahigh risk for the timely implementation of this Action,reinforcedevenfurtherbytheplannedbulkofexpendi-ture in the end of the period stipulated in the call forproposals.

ThisActionconsistsofworksrelatedtothenewdualtrackline from Copenhagen to Ringsted via Køge, including a

newstation in thenorthernpart ofKøge. It foreseesmajorworkswhich include, interalia,theextensionoftheexistingAvedøre Havnevej bridge, the construction of two railwaytunnels, six bridges, structures for fauna passages, a roadpassingovertheHolbækMotorway,railwaytunnelunderthemotorway;aswellasenvironmentalworkandutilityreloca-tions,projectmanagementandlandacquisition.

New railway line Copenhagen-Ringsted (works) - upgrading the railway access lines to the future

Fehmarn Belt fixed link

2012-DK-20011-P • Part of Priority Project 20

PPs - New ActionMember States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested fundingTotal eligible costs €667,347,121

TEN-T requested funding: €133,469,425

TEN-T funding: 20%

Recommended funding €0

TheproposedAction is relevant to the call for propos-als, of good quality and significant expected imapct.However,interdependencyofworksandstudiesimplyahigh risk for the timely implementation of this Action,reinforcedevenfurtherbytheplannedbulkofexpendi-ture in the end of the period stipulated in the call forproposals.

The Action consists of the construction of part of theFehmarnrailwayhinterlandconnectionsinDenmark(Pri-

ority Project 20). The current road bridges on Lolland andFalsterwillberaisedorreplaced,afairwayinStorstrømmensouthofMasnedøwillbeestablishedandanewplatformatVordingborgStationwillbeconstructed.Demolitionofbuild-ingsandnoiseprotectionofexistingbuildingswillbeinitiated.Furthermore,theacquisitionoflandnotincludedintheActionwilltakeplace.

Upgrading the Ringsted-Rødby section (works) - upgrading the

railway access lines to the future Fehmarn Belt fixed link

2012-DK-20014-P • Part of Priority Project 20

PPs - New ActionMember States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested fundingTotal eligible costs €57,254,437

TEN-T requested funding: €11,450,887

TEN-T funding: 20%

Recommended funding €0

155

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €59,000,000

TEN-T requested funding: €11,800,000

TEN-T funding: 20%

Recommended funding €0

TheproposedAction is relevant to the call for propos-als as it is linkedwith Priority Project 3. However, theproposal suffers from a low maturity as it failed todemonstratethatithasreceivednecessarysupportandsomepreparatorystepshavenotyetbeentakenwhichundermines its readiness tostart.Similarly, the impactoftheActionproposedisonlydescribedinagenericwayandbasedonoutdateddata.Thequalityoftheproposalislowaskeyinformationisnotprovided.

The Global Project consists of an international gaugeconnection from the Port of Barcelona to the French

borderalongtheMadrid-Barcelona-Frenchborderhighspeedrail line,allwithin theframeworkofPriorityProject3 (Highspeed railwayaxis of southwest Europe). The proposedAc-tioninvolvestheconstructionofanewrailwayaccesstotherecentlybuiltPratpierwithitsnewTercat-HutchisoncontainerterminalinthePortofBarcelona.

New south railway access to the Port of Barcelona. Phase 1.

2012-ES-03101-P • Part of Priority Project 3

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The Action is relevant to the call for proposals andthe TEN-T priorities as it addresses a bottleneck onPriorityProject20.Itsmaturityandqualityareverygood.However, theoutputof thisActionwillnot lead imme-diatelytophysicalimplementationthusunderminingitsexpectedimpact.Therefore,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupport to thisActionwouldnotoptimise theeffectivenessofTEN-Tfunding.

TheActionconcernsstudiesfortheconstructionofanewStorstrømBridgeofabout3.9km,partoftheFehmarnBelt

railwayaxis(PriorityProject20).Theyincludetheenvironmentalimpactassessment,conceptualdesignandpreparationoftheconstructionactforanewbridge.

New Storstrøm Bridge (studies) – upgrading the railway access line

to the future Fehmarn Belt fixed link

2012-DK-20027-S • Part of Priority Project 20

PPs - New ActionMember States involved:Denmark

Applicant:Banedanmark (Rail Net Denmark)

Requested fundingTotal eligible costs €30,041,000

TEN-T requested funding: €15,020,500

TEN-T funding: 20%

Recommended funding €0

156

Evaluation remarks Evaluation remarks

NOT RECOMMENDED FOR FUNDINGNOT RECOMMENDED FOR FUNDING

The proposed Action is very relevant to the call forproposals as it addresses the bottleneck on PriorityProject 8. As part of the Global Project, the impact oftheActionisverygood,includingpositivesocio-economicbenefitsfromtheimprovedaccessibilityoftheinvolvedregions.Overalltheproposalisofgoodquality,realisticandconsistentfromatechnicalpointofview.However,the Action is in advanced stage of implementation sothattheleverageofEUfundingislimited.

The Action consists of the construction of a high speedrailway platform on the Vigo-Santiago de Compostela

section along Priority Project 8 (Multimodal axis Portugal/Spain-restofEurope).Itsfollowupservicesarealsoincluded.Thesectionwillbeequippedwithtwo,electrifiedUICtracks,setforamaximumdesignspeedof250km/h.TheActionalsoincludestheconstructionof21viaductsand18tunnels.

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €226,945,517

TEN-T requested funding: €45,389,104

TEN-T funding: 20%

Recommended funding €0

Platform works on the Vigo–Santiago de Compostela

section

2012-ES-08094-P • Part of Priority Project 8

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €197,094,612

TEN-T requested funding: €39,418,922

TEN-T funding: 20%

Recommended funding €0

The proposed Action is very relevant to the call forproposals as it concerns works for the removal of abottleneckalongPriorityProject8.It ismatureanditsimpactisimportantinthecontextoftheGlobalProject.Thequalityoftheproposalisalsogood.However,thereareuncertaintiesinconnectionwiththetechnicalscopetobeachievedby2015.ConsideringthisinconjunctionwiththescarcityofEUfundssupporttothisActionwouldentailasuboptimaluseofTEN-Tfunding.

Theproposal consists of theworks for the installationoftrack, electrification, signalling, telecommunications and

civil protection facilities, aswell as the services for follow-up of the construction on the 156 km long Vigo-A CoruñasectiononSpain’snorth/northwestrailcorridor,partofPrior-ityProject8(MultimodalaxisPortugal/Spain-restofEurope).

Supply, track assembly, electrical, signal-ing, telecommunications and civil protec-tion facilities and services for follow-up on section Vigo–A Coruña. Eje Atlántico

Alta Velocidad

2012-ES-08095-P • Part of Priority Project 8

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

157

TheproposalconcernsstudiestoidentifyandevaluatetheworksneededtoupgradePriorityProject16(Freightrail-

way axis Sines/Algeciras-Madrid-Paris). Specifically, they in-cludethenecessaryanalysisoftheexistinginfrastructureanddevelopment plans fromSpain, France and Portugal— thecountriesthroughwhichthelinepasses.Astudyofthetrafficdemand,volume,typeandcostofserviceswillalsobeper-formedandaforecastfordifferentscenarioswillbeestimateduntil2050.

The quality of the proposal is good. However, theproposed Action has a low relevance to the call forproposalsasitconcernsapre-feasibilitystudyanddoesnotdemonstratehowitwillleadtoimplementation.ThematurityoftheActionisnotdemonstratedgiventhatitremainsunclearwhethertheActionhasreceivedneces-sary supportwhile key preparatory steps have not yetstarted.Itsimpactasdecisionmakingtoolhasnotbeensubstantiated.

2012-ES-16029-S • Part of Priority Project 16

Technical actuations for the optimi-zation of freight railway axis Sines/

Algeciras-Madrid-París (PP16) and the planning on the Spanish existing part

Airport link Tenerife north-south with an innovative and modern

railway system (Maglev)

TheproposedAction is onlymarginally relevant to thecall for proposals and it is not related to any PriorityProject. TheAction is notmature, as it is not ready tostartfromatechnicalpointofview.ThepotentialimpactoftheActionhasnotbeendemonstratedanditsqualityisnotsound,asitlacksdetailsandclarity.

2012-ES-14016-S • Part of Priority Project 14

The proposal concerns the feasibility and design studiesnecessaryfortheimplementationofa65kmnorth-south

railwaylinebasedonamaglevsystem(trans-rapidmagneticlevitation railway), linking the two airports of the island ofTenerife.

This transport solution comprising a modern and attractive rail link is required in addition to the north-south motorway, in order to take the strain off the latter and to improve overall links between the north and south. A trans-rapid maglev could provide a solution for a rapid transfer link between the two airports, and serve as an additional tourist attraction.

PPs - New ActionMember States involved:Spain

Applicant:Fundacion Transpirenaica-Travesia Central del Pirineo

Requested fundingTotal eligible costs €1,200,000

TEN-T requested funding: €600,000

TEN-T funding: 50%

Recommended funding €0

PPs - New ActionMember States involved:Spain

Applicant:Cabildo Insular de Tenerife

Requested fundingTotal eligible costs €1,000,000

TEN-T requested funding: €500,000

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

158

PPs - New ActionMember States involved:Spain

Applicant:Sociedad Estatal de Infraestructuras del Transporte Terrestre, S.A.

Requested fundingTotal eligible costs €219,054,606.89

TEN-T requested funding: €43,810,921.38

TEN-T funding: 20%

Recommended funding €0

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

Theproposalconcernsrailbedworksfortheconstructionofthe30kmlongsectionbetweenCernadilla,Pedralbadela

Praderíaand thePadorneloTunnelalong theMadrid-Galiciahighspeedline,partofPriorityProject19(Highspeedrailin-teroperabilityintheIberianPeninsula).Theworksinvolvetheconstruction of tunnels, false tunnels, viaducts, overpassesandunderpasses.TherailbedisdesignedforadoubletrackUIC gauge, allowing speeds over 350 km/h for passengerservices.

The proposal consists of works for the constructionof the rail bed for the 8 km long Zamora-La Hiniesta

sectionalongtheMadrid-Galiciahighspeedline,partofPrior-ityProject19 (Highspeedrail interoperability in the IberianPeninsula).Theworks includeoneviaduct,one false tunnel,overpassesandunderpasses,aswellastheadaptationoftwoexisting tunnels.The railbed isdesignedforadouble-trackUICgaugeallowingamaximumspeedof350km/h.Thelefttrackwillalsobeequippedwithathirdrail, toallowfreightservicesinIberiangauge.

Madrid-Galicia high speed rail: section Cernadilla-Pedralba de la Pradería-Padornelo Tunnel

2012-ES-19004-P • Part of Priority Project 19

PPs - New ActionMember States involved:Spain

Applicant:Sociedad Estatal de Infraestructuras del Transporte Terrestre, S.A.

Requested fundingTotal eligible costs €44,197,482.26

TEN-T requested funding: €8,839,496.45

TEN-T funding: 20%

Recommended funding €0

Madrid-Galicia high speed mixed traffic rail: section:

Zamora-La Hiniesta

2012-ES-19005-P • Part of Priority Project 19

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

159

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €483,880,600

TEN-T requested funding: €96,776,120

TEN-T funding: 20%

Recommended funding €0

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

TheproposalconcernsworksfortheimplementationofUICgauge in the rail sectionbetweenVandellósandAlmus-

safes,on theMediterraneancorridor,partofPriorityProject19(Highspeedrail interoperabilityintheIberianPeninsula).Itcoversthenecessaryadaptationsonthefacilitiesandele-mentsof the linefor theoperationof750m longtrains inmixedgauge.Theworkswillbecarriedoutalong249kmofdoubletrackand29kmofsingletrackandwillallowtheac-cesstothePortsofValenciaandSaguntoinstandardgauge.

Theproposalconcernsrailbedworksandrelatedfollowupservicesonthe9.55kmlongrailwaysubsectionSanIsidro-

Orihuela,belongingtotheMadrid-CastillaLaMancha-Comuni-dadValenciana-RegióndeMurciahighspeedrailwayline,partofPriorityProject19 (Highspeed rail interoperability in theIberianPeninsula).TherailbedisdesignedfordoubletrackinUICgaugeandamaximumspeedof220km/h.Twoviaductsandatunnelwillbeconstructed.

Implementation of the UIC gauge in the Mediterranean Corridor. Vandellos-Almussafes section.

Phase 1.2012-ES-19042-P • Part of Priority Project 19

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €128,324,445

TEN-T requested funding: €25,664,889

TEN-T funding: 20%

Recommended funding €0

Platform works on subsection San Isidro-Orihuela and

services for follow-up works

2012-ES-19082-P • Part of Priority Project 19

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

160

TheActionconsistsofworksintheNudodelaEncina-Mo-genteandMogente-AlcudiadeCrespínssubsections,along

theMadrid-Levante/MediterraneancorridoronPriorityProject19(Highspeedrail interoperability intheIberianPeninsula).Theworks,foratotallengthof36.3km,coverinteraliatheconstructionoftherailbedforIberiangauge(includingtun-nels and viaducts), installation of tracks (with polyvalentsleepers),electrificationat3kV,aswellassecurityandcom-municationinstallations.Thelineisdesignedformixedtrafficwithamaximumspeedof110km/h.

The maturity of the proposed Action is excel-lent as the works have already started. However, itsrelevance to the call for proposals has not beendemonstrated.Inparticular,itcannotbeestablishedhowthe Aciton will increase interoperability and remove abottleneck,asstated.Subsequently,itsimpactislowandthesocio-economicbenefitsareonlypresented for theGlobalProject.ThequalityoftheproposalisonlyfairasitincludesnokeyinformationontheproposedActionbutratheronwiderandnotrelatedaspects.

Platform works on the Lubian-Tunel de la Canda, Tunel de la Canda-Vilavella and

Tunel de O Cañizo (Via izquierda) subsec-tions and services for follow-up works

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

TheActionconsistsoftheconstructionofthreehighspeedrailway subsection platforms along the Lubián-Ourense

section of the Madrid-Galicia-Portugal high speed rail lineanditsfollowupservices.Thethreesubsectionswillhavetwoseparated platforms, each one equippedwith a single one-way,UICelectrifiedtrack.Thesesectionsaredesignedforaspeedof350km/h.Fourdoubledeckviaductsandfourdoubletubetunnelswillalsobebuilt.

2012-ES-19084-P • Part of Priority Project 19

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €202,259,180

TEN-T requested funding: €40,451,836

TEN-T funding: 20%

Recommended funding €0

Platform and track bed works on the Nudo de La Encina–Mogente and

Mogente-Alcudia de Crespins subsections

2012-ES-19085-P • Part of Priority Project 19

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €59,243,785

TEN-T requested funding: €11,848,757

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

161

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €162,367,076

TEN-T requested funding: €32,473,416

TEN-T funding: 20%

Recommended funding €0

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

TheproposedActionisrelevanttothecallofproposalsandTEN-TprioritiesasitcontributestotheachievementofPriorityProject19.TheActionisverymatureasithasalreadystarted.Itisexpectedtoproducepositiveimpactontheenvironmentbyshiftingtrafficfromroadtorail.Theoverallqualityisgood.However,giventheadvancedstageof implementation the leverageofEUfunding islimited.

LocatedonPriorityProject19(Highspeedrailinteroperabil-ityintheIberianPeninsula),theproposalreferstoworks

on theOlmedo-Zamora-Pedralba de la Pradería high speedrailway line section, along the Madrid-Valladolid-Galicia-Portugalnorth/northwestcorridor.Foreseenactivitiesincludetrackequipmentsupply,assemblyandtransportation,aswellaspowersupply.

LocatedonPriorityProject19(HighspeedrailinteroperabilityintheIberianPeninsula),theproposalcoversworksonthe

Albacete-Alicante section, along the Madrid-Castilla LaMancha-ComunidadValenciana-RegionofMurciahighspeedrailwayline.Foreseenactivitiesincludesupply,trackassem-bly,electrical,signalling,telecommunicationacoustic,environ-mentalprotectivemeasuresandcivilprotectionfacilities.

Supply, track assembly and energy facilities on the Olmedo-Zamora-

Pedralba de la Pradería high speed rail section

2012-ES-19088-P • Part of Priority Project 19

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €194,990,227

TEN-T requested funding: €38,998,045

TEN-T funding: 20%

Recommended funding €0

Supply, track assembly, electrical, signalling, telecommunication acoustic

and civil protection facilities on the section Albacete-Alicante of the high

speed rail line Madrid-Levante

2012-ES-19097-P • Part of Priority Project 19

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

162

The proposed Action consists of the necessary studies tolaunchtherehabilitationandupgradingworksforthetrack

andrelatedinfrastructuresontheZaragoza-Canfranc-Pauin-ternationalrailwayline,partofPriorityProject16(FreightrailwayaxisSines/Algeciras-Madrid-Paris).Theconcernedsectionhasadirecteffectonthecross-bordersectionandareawithina100kmradiusoftheFrench-Spanishborder.

TheproposedActionisrelevanttothecallforproposalasitconcernsstudiesfortheupgradingofacross-bor-dersectionalongthePriorityProject16.TheimpactoftheActionisgoodinlinewiththisoftheGlobalProject.However,thematurityoftheActionislow,asitscriticalpartswill start lateandwill be subject to a very tighttime schedule. Moreover, the necessary joint manage-ment structure has not yet been set-up. Similarly, theproposalisoflowquality.Severaltechnicalandfinancialelementshavenotbeenprovided.

Supply, track assembly and complementary works, electrical, signaling and telecom-

munications facilities on the Mediterranean Corridor railway link LAV Madrid-Barcelona-

French border

The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

The Action consists of the supply, track assembly andcomplementary works — including electrical, signal-

lingandtelecommunicationsfacilities—onthe62kmlongVandellos-Tarragona sectionalong theMediterraneanCorri-dor rail link - LAV (Linea alta Velocidad)Madrid-Barcelona-Frenchborder,partofPriorityProject19(Highspeedrailin-teroperabilityintheIberianPeninsula).

2012-ES-19114-P • Part of Priority Project 19

PPs - New ActionMember States involved:Spain

Applicant:Administrador de Infraestructuras Ferroviarias

Requested fundingTotal eligible costs €201,623,440

TEN-T requested funding: €40,324,689

TEN-T funding: 20%

Recommended funding €0

PPs - New ActionMember States involved:Spain, France

Applicant:Gobierno de Aragón

Requested fundingTotal eligible costs €7,869,524

TEN-T requested funding: €3,934,762

TEN-T funding: 50%

Recommended funding €0

Studies for the adaptation of the existing infrastructures of the in-

ternational Zaragoza-Canfranc-Pau line

2012-EU-16019-P • Part of Priority Project 16

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

163

PPs - New ActionMember States involved:Austria, Germany

Applicant:Kaindl Invest GmbH

Requested fundingTotal eligible costs €73,739,476.40

TEN-T requested funding: €14,747,895

TEN-T funding: 20%

Recommended funding €0

The proposed Action is partly relevant to the call ofproposals,aslongasitconcernsdevelopmentofinter-modalterminals.TherelevantpartsofproposedActionarereadytostart.Itsimpactisdemonstratedinparticu-larwithregardtotheGlobalProject.Thequalityoftheproposalisgood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupport to thisActionwouldnotoptimise theeffectivenessofTEN-Tfunding.

The current container terminal at the Port of Enns has reached its ca-pacity limits of 180,000 movements per year. The ENNS MULTIMODAL

project will develop a modern container terminal with enhanced rail infra-structure, integration of IWW port facilities and an extensive logistics cen-tre of more than 3.5 million m² - making it the largest integrated industrial development area on the upper Danube. The terminal is strategically situated on the upper Danube and especially relevant for Priority Project 17 (Railway axis Paris-Strasbourg-Stuttgart-Wien-Bratislava), Priority Project 22 (Railway axis Athina– Sofia–Budapest–Wien–Praha–Nürnberg/Dresden) and Priority Project 18 (Wa-terway axis Rhine/Meuse-Main-Danube).

The vision is to provide a trimodal cargo transport centre, consisting of an intermodal terminal and a cargo city, which ensures a reduced burden on metropolitan areas, a modal shift from road to rail and IWW, bundling of volumes, reduced cost by centralisation and support for deep sea ports by providing a state-of-the-art hinterland rail terminal.

Connecting Priority Project TEN Axis 17 (rail) with Priority Project 18

(IWW): Priority Project in Sub-Section Salzburg-Wien: ENNS MULTIMODAL

2012-EU-17118-P • Part of Priority Project 17

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

E18 Ring Road III 2nd phase (Airport road)

Given that the proposed works concern a small andexisting section on Piorirty Project 12 the comparativeEUaddedvalueoftheproposalislimited.Moreover,theworkscanstartonlywhentheconstructionplaniscom-pleted,whichputsat risk the timely completionof theworksbyendof2015asstipulatedinthecallforpro-posals.

Theproposal,thesecondphaseofGlobalProject“RingRoadIII”,aimstoimprove8kmoftheE18roadneartheHelsinki

Airport.TheRingRoad III (2km),AirportRoad (1.5km)andTikkurilaRoad(1.5km)willbeimprovedwiththerelatedtwointerchanges,18bridgesandarrangementsforpedestrian/bi-cycletrafficandpublictransport.

TheActionaimstoremoveamajorbottleneck,improvetrafficsafetyandcreateanewroadconnectiontoHelsinkiAirport.

2012-FI-12063-P • Part of Priority Project 12

PPs - New ActionMember States involved:Finland

Applicant:Ministry of Transport and Communications

Requested fundingTotal eligible costs €87,600,000

TEN-T requested funding: €18,030,000

TEN-T funding: 20.58%

Recommended funding €0

164

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

GSM-R Roll-out

TheproposedAction is relevant to the call for propos-alsandhasverygoodmaturity. Ithasstartedand thefinancial resourcesare secured. The impact is goodasthe Actionwill contribute to increasing interoperability,though limited to the GSM-R only. The quality is alsogood. However, since it contributes to interoperabilitythroughthedeploymentofGSM-Ritisoflowerprioritytothecallforproposals.

ThisActionconcernsworkstoreplacetheexistingground-to-trainsystemwithaGSM-Rinteroperableradiosystem,

over 1,410 kmof high speed line (sectionsworked at over250 km/h). Two of the four concerned sections are locatedalongPriorityProject3(High-speedrailwayaxisofsouthwestEurope),onealongPriorityProject2(High-speedrailwayaxisParis-Bruxelles/Brussel-Köln-Amsterdam-London), and thefourthisalooplinearoundParis.

2012-FR-03052-P • Part of Priority Project 3

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested fundingTotal eligible costs €103,478,261

TEN-T requested funding: €23,293,226

TEN-T funding: 22.51%

Recommended funding €0

TheproposalconcernsasectionofPriorityProject12(NordicTriangle railway/roadaxis)motorway connectingHelsinki

totheRussianborder.Theworksconsistofimprovementsof2.8kmofexistingmotorwaybetweenKymenlinnaandRan-tahakathroughthebuildingofnewhighwayrampsandroadconnections,ninebridges(6newand3improved),twointer-changes(1newand1improved),and6kmofnoisebarriersbetweenKarhulaandRantahaka.TheActionaimstoalleviateabottleneck and to improve the safety and reliability of thisroadsection.

Given that the proposed works concern a small andexisting section on Piorirty Project 12 the comparativeEUaddedvalueoftheproposalislimited.Moreover,theworkscanstartonlywhentheconstructionplaniscom-pleted,whichputsat risk the timely completionof theworksbyendof2015asstipulatedinthecallforpro-posals.

PPs - New ActionMember States involved:Finland

Applicant:Ministry of Transport and Communications

Requested fundingTotal eligible costs €32,000,000

TEN-T requested funding: €6,670,000

TEN-T funding: 20.84%

Recommended funding €0

E18 motorway at Kotka

2012-FI-12119-P • Part of Priority Project 12

165

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Located on Priority Project 3 (High-speed railway axis ofsouthwestEurope),theproposalreferstoworksonTours-

Bordeauxsection:300kmofhighspeedrailwaylineand40kmofconnecting lines.Theproposedactivities includecon-structionworksunderaconcessionarrangement,aswellasworks of connecting lines and the central signalling, pointsand power supply facilities (under Réseau Ferré de Franceresponsibility).

TheproposedAction is relevant to the call for propos-als(PriorityProject3),verymatureandwithsignificantexpectedimpact.Itsqualityisalsoverygood.However,taking into account the need to handle the scarcity offundsand in linewiththecallprioritiessupport tothisAction would not optimise the effectiveness of TEN-Tfunding.

Tours-Bordeaux, work for the South Europe Atlantic high

speed line (SEA HSL)

2012-FR-03110-P • Part of Priority Project 3

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested fundingTotal eligible costs €3,624,944,000

TEN-T requested funding: €724,988,800

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

New railway line between Montpellier and Perpignan

The proposed Action is very relevant as it aims toremovea bottleneck onPriority Project 3.However, itsmaturityispoorasthenecessarysupporthasnotyetbeenprovidedandtheprocurementproceduresareundefined.Inaddition, financial resources havenot been committed.The impact cannot be defined as the socio-economicstudy is underway, and the preliminary results are notpresented.Overall,thequalityoftheproposedActionisweakincludingincompleteinformation.

2012-FR-03112-S • Part of Priority Project 3

Located on Priority Project 3 (High-speed railway axis ofsouthwest Europe), the proposal concerns early stage

studies on the new rail line between Montpellier-Lattes(Hérault) and Perpignan-Le Soler (Pyrénées-Orientales). Theforeseenactivitiesincludepre-projectstudiesoneachofthesevenconnectionsplanned to integrate thenewMontpellierPerpignanlineintotherailwaynetworkalreadyinoperation.

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested fundingTotal eligible costs €10,000,000

TEN-T requested funding: €5,000,000

TEN-T funding: 50%

Recommended funding €0

166

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedActionishighlyrelevant,asitcontributestotheimplementationofPriorityProject17andisinlinewith thecall forproposals.Thematurity ishighas theworkshavealreadystarted.TheexpectedimpactoftheActionispositiveanditsoverallqualityisgood.However,taking into account the need to handle the scarcity offundsand in linewiththecallprioritiessupport tothisAction would not optimise the effectiveness of TEN-Tfunding.

TheproposedAction,partofPriorityProject17,formsthesecondphaseoftheGlobalProjectwhichistheconstruc-

tionofEuropeanhighspeedlinebetweenParistoVendenhe-imnearStrasbourg,partofPriorityProject4.Thefirstphase,Paris-Baudrecourt(300km),wascompletedinJune2007.Theproposed Action includes construction works to extend thelinetoVendenheimnearStrasbourgwiththeconstructionof106kmofhigh-speedline—including4kmoftunnelundertheVosgesandbranchestowardsBaudrecourt(connectiontothe first phase already in service), Vendenheim (connectiontotheconventionallinetoStrasbourg),andjunctionstoLucy(servicestoLuxembourgandStrasbourg)andRéding(servicestoNancyandStrasbourg).

2012-FR-17051-P • Part of Priority Project 4

Second phase of the East Europe-an HSL (high speed line) between

Baudrecourt and Strasbourg

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested fundingTotal eligible costs €670,000,000

TEN-T requested funding: €134,000,000

TEN-T funding: 20%

Recommended funding €0

LocatedonPriorityProject16 (Freight railwayaxisSines/Algeciras-Madrid-Paris), the proposal concerns works

needed for re-opening the 24.5 km passenger rail linebetween the boroughs of Oloron-Sainte-Marie and Bedousin the Atlantic Pyrenees. The foreseen activities includepreparatoryworks,civilworks,worksontracks,signallingandtelecommunications;andautomationof level crossings.Thelineisplannedtobeputintoserviceby31December2015.

The relevance of the proposed Action to the call forproposals is good, as it contributes to the imple-mentation of Priority Project 16 and subsequentlyto the achievement of interoperability, facilitation offreight transport and modal shift from road to rail.Itsmaturity is good; the proposed Action has receivedthe required approvals and the necessary prepratorystepsareabouttobeaccomplished.Apositiveimpactisexpected.Thequalityoftheporposalisverygood.How-ever,givenitslocaldimenssionandinlinewiththecallforproposalsprioritiessupportofthisActionwillnotop-timisetheeffectivenessofEUfunding.

Oloron Bedous

2012-FR-16055-P • Part of Priority Project 16

PPs - New ActionMember States involved:France

Applicant:Ministère de l’écologie, du développement durable, et de l’énergie

Requested fundingTotal eligible costs €102,000,000

TEN-T requested funding: €30,600,000

TEN-T funding: 30%

Recommended funding €0

167

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedAction involvestheconstructionofanover-bridgetoeliminateReilly’sLevelCrossingontheDublin-

MaynoothLine.Situated4kilometresnorthwestofConnollyrailway station in Dublin’s city centre, it forms an essentialelementinfacilitatingincreasedcapacityontheexistingraillineforbothintercityandcommuterrailservices.Italsoaimsto improve traffic on the regional R103 Ratoath road andreducetrafficcongestion.

TheproposedActionisofverygoodqualityanditsma-turity isgood.The impact ismainlyexpectedonsafetyimprovementsaturbanlevel.However,therelevanceofthe proposed Action is limited because it does not layonaPriorityProjectanditmainlyconcernsanancillaryinterventionwithpositiveeffectsonurbantrafficlevel.

PPs - New ActionMember States involved:Ireland

Applicant:Department of Transport, Tourism and Sport

Requested fundingTotal eligible costs €7,889,000

TEN-T requested funding: €1,578,000

TEN-T funding: 20%

Recommended funding €0

Removal of level crossing and construction of overbridge at

Reilly’s Crossing on the Dublin-Maynooth rail line

2012-IE-26035-P • Part of Priority Project 26

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

2012-IE-26038-S • Part of Priority Project 26

Development of a replacement centralised traffic control centre - strategy study and detailed design

for tender

PPs - New ActionMember States involved:Ireland

Applicant:Department of Transport, Tourism and Sport

Requested fundingTotal eligible costs €2,482,000

TEN-T requested funding: €1,241,000

TEN-T funding: 50%

Recommended funding €0

The proposed Action ismature, as there are no pend-ingtechnicaloradministrativeissuestobesolvedbeforeitmight be launched. Its impact is good; the delivera-bleswillbeusedasadecision-makingtool.Thequalityisgood.However,itsrelevancetothecallforproposalsislowasitwillnotleadtodirectphysicalimplementa-tionoftheCentralisedTrafficControlCenteronPriorityProject26,sincethismissinglinkconcernedwillonlybyconstructedinthefuture.

TheproposalconcernspreparationofaneffectiveCentral-ised Traffic Control Centre (CTCC) development strategy

and design to accommodate the needs of the rail networkbasedbothoncurrentandforecasteddemandsupto2030.

ItisapartofGlobalProjectthatcoversimplementationofanelectrified,masstransitrailtransportoperatingintheDublinarea.

168

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

2012-IT-01077-P • Part of Priority Project 1

Technological Upgrade of the Florence Node

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €26,826,000

TEN-T requested funding: €5,365,200

TEN-T funding: 20%

Recommended funding €0

TherelevanceoftheproposedActionisinsufficientsinceitbelongsonlypartlyonPriorityProject1.Itsmaturityislowasthereisinsufficientevidenceofnecessaryapprov-alsandcommitment,thetechnicaldetailsprovidedaretoolimitedtoassesstheproposedAction’sreadinesstostart.Theimpacthasbeenestimatedasinsufficient.Thequalityislow,itlacksclarity,completenessandconsist-ency.

Theproposalconcernsanupgradeof thecontrol roomoftheFlorence-Romeremotecontrolsystem,aswellas its

extensiontotheFlorencenode.ItisapartofaGlobalProjectcoveringanupgradeoftheFlorencenodeandtheFlorence-Romerailwayline(PriorityProject1RailwayaxisBerlin-Vero-na/Milano-Bologna-Napoli-Messina-Palermo), with a view tooptimisingrailwaytrafficmanagementinthearea.

TheAction formspartofaGlobalProject thatentails thereplacementof technological installationsalong260km

oflinesmergingintotherailwaynodeofRome.Theactivitiesaim to introduce a new centralised rail trafficmanagementsystem based on SCC (Command and Control System) andACCMmodules(computerbasedmulti-stationinterlocking)ontwosections:•PoggioMirteto-RomeTiburtina•RomeCasilina-Campoleone

TheycomprisetheinstallationofthetechnologiesintheRomeTerminiexistingcontrolroomandatthestationslocatedalongthelines,inordertorenewtheexistingautomaticblocksys-temalongthetworailwaylinesconcerned.

ThequalityoftheproposedActionisgood.Itwouldhaveapositiveimpactataregionalandlocallevel,especiallyfor the connection of neighbouring areaswith the cityofRome.However, theproposedAction isonlypartial-lyonPriorityProject1and itsrelevanceunderthecallforproposalsislow.Moreover,itisinsufficientlymaturebecausepreparatory stepsnecessary for launching theActionhavenotyetbeenundertaken.

Technological Enhancement for the Rome Node: phases

2012-IT-01073-P • Part of Priority Project 1

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €71,400,000

TEN-T requested funding: €14,280,000

TEN-T funding: 20%

Recommended funding €0

169

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The Global Project is to deliver a new underground highspeed/high capacity railway link though the city of

Bologna,alongPriorityProject1(RailwayaxisBerlin-Verona/Milano-Bologna-Napoli-Messina-Palermo). The proposed Ac-tionaddressesamajorbottleneckbyopeningupthenewtun-nel(inauguratedinJune2012)topassengerstoppingservices.

TheproposedActionisrelevanttothecallforproposalsandaimsatremovingabottleneck.Itisexpectedtohavea positive impact on absorption of traffic growth,mo-dalsplit,inter-operabilityandsafety.Thequalityisgood.However,theActionisinadvancedstageofimplementa-tionsothattheleverageofEUfundingislimited.

HS/HC Bologna node: comple-tion of rail through link and rail

works in the HS station

2012-IT-01078-P • Part of Priority Project 1

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €77,933,622

TEN-T requested funding: €15,586,725

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The maturity is good because the study is already inprogress, and theproposal is ofgoodquality,with co-herentactivitiesand realistic froma technicalpointofview.However,therelevanceoftheproposaltothecallforproposalsislimitedbecauseitrefersmainlytourbandevelopmentissuesatlocallevel.TheimpactoftheAc-tionisonlyfairandthereisnoevidenceofthefollow-uptobegiventotheoutcomeofthestudies.Inaddition,thestudiesareataveryearlystage.

TheActionformspartofanurbanGlobalProjectinBozen/Bolzano(Italy)withthetrainstationandtheareaofthe

existingrailtracksplayingacentralrole.

TheActioncomprisesamasterplan,animplementationplanfor the reorganisation of Bozen/Bolzano rail station and apreliminaryprojectforarailtunnel.

2012-IT-01109-S • Part of Priority Project 1

MPM – BZ Masterplan Mobility Plan – Bolzano railway station

PPs - New ActionMember States involved:Italy

Applicant:Areale Bolzano - ABZ S.p.A.

Requested fundingTotal eligible costs €2,519,574

TEN-T requested funding: €1,259,787

TEN-T funding: 50%

Recommended funding €0

170

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedAction is relevant to the call for propos-als,verymatureandwithsignificantexpectedimpact.Itsquality isalsoverygood.However, taking intoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.

TheproposedActionconcernsworkstorenewandhomog-enise the signalling equipment along the Turin-Padova

rail line, which belongs to Priority Project 6 (Railway axisLyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border), Freight Corridor 6 and ERTMS Corri-dor D. The aim is to implement a highly advanced sys-tem of supervision, command and control, based on asingle supervision system for the whole line (SCCM), in-tegrated with five multi-station interlockings (ACCM), inorderthattheentireTurin-Padualineismanagedbyamain,safetycomputercontrollingfiveMilan-basedACCM.

2012-IT-06075-P • Part of Priority Project 6

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €211,289,940

TEN-T requested funding: €42,257,988

TEN-T funding: 20%

Recommended funding €0

Upgrading of the Turin-Padua line: line and station

installations

Located on Priority Project 6 (Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian

border), the proposal concerns the definitive project studies for the Avigliana-Orbassano section. Activities include the prepara-tion of all plan descriptions, charts as well as the technical and economic data necessary for works implementation.

TheproposedAction,partofPriorityProject6,isrelevantasitfillsinacriticalsectionofthenewhighspeedlineTorino-Lyon and addresses a bottleneck. However, itsmaturity is insufficient as preliminary steps necessaryfor theAction to starthavenot yetbeen fulfilled. Thisconstitutesamajorrisk.Itsimpactisinsufficientasthefinancialanalysisisunclear;thesocio-economicanalysislacksdetails.Theproposal’squalityispoorduetoalackofsufficientlydetailedinformation.

2012-IT-06074-S • Part of Priority Project 6

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €32,310,000

TEN-T requested funding: €16,155,000

TEN-T funding: 50%

Recommended funding €0

Turin Beltway: final design of the Avigliana-Orbassano line

171

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action is part of a Global Project (HS/HC Terzo Valico dei Giovi Pass) located on Priority Project 24 (Railway axis Lyon/

Genova-Basel-Duisburg-Rotterdam/Antwerpen) It concerns in par-ticular:

•CampassoTunnel: tunnel of double track line locatedbetweentheprogressivekm0+437and1+153

•Passtunnelworksofthe:southernentrance,structuresfortheopenings,astretchnearthenorthernentrance,mechanisedex-cavationoftheoddtrackfromkm27+327tokm24+197andrelatedactivities

•Pass tunnel openings: construction of access tunnels to thevariousfrontsofthepasstunnelexcavation(usedtoensurethesafety of the infrastructure during the operation), namely theopeningsofPolcevera,Cravasco,Castagnola,andValLemme

TheproposedAction’s relevance to thecall forpropos-alsishigh.Itsmaturityisdemonstratedbypoliticalandfinancialcommitments.TheproposedActioncontributesto improveand increasetheflowof trafficbyaddress-ingabottleneck.Thequalityissufficient.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.

PPs - New ActionMember States involved:Italy

Applicant:Ministero delle Infrastrutture e dei Trasporti

Requested fundingTotal eligible costs €463,706,340

TEN-T requested funding: €92,741,268

TEN-T funding: 20%

Recommended funding €0

2012-IT-24076-P • Part of Priority Project 24

HS/HC Terzo Valico dei Giovi Pass: works for the 1st and 2nd

constructive lots

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

The proposed Action addresses verywell the objectiveofthecallforproposalsbyfacilitatingthesmoothflowofpassengerandfreighttrafficonanimportantsectionof Priority Project 28. Its quality is good.However, theproposal’smaturity isonly fairas theproject’s specificfinancinghasnotbeenapprovedyet,whichisaprecon-ditionfortheworkstostart.TheproposedActionisnotreadytostart fromatechnicalpointofvieweither,asmostofthepreliminarynecessarystepsarestillpending.

Theproposal,aspartof theGlobalProject/PriorityProject28(“Eurocaprail”ontheBrussels-Luxembourg-Strasbourg

railwayaxis), involveworks for re-electrification toAC25kVoftherailwaylinebetweenLuxembourgandtheBelgianbor-der.Theproposedactivitiesarethereconstructionofexistingoverpassesandtheconstructionofnewelectrificationinstal-lations.

TheActionaimstocomplywiththetechnicalspecificationsforinteroperability,thustofacilitatetheflowoftrafficonPriorityProject28.

2012-LU-28032-P • Part of Priority Project 28

EuroCap-Rail: Luxembourg- Kleinbettingen (LU/BE border) -

re-electrification of the line in 2AC 25kV 50Hz

PPs - New ActionMember States involved:Luxembourg

Applicant:Ministère du Développement durable et des Infrastructures

Requested fundingTotal eligible costs €39,893,125

TEN-T requested funding: €7,978,625

TEN-T funding: 20%

Recommended funding €0

172

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

2012-NL-24009-S • Part of Priority Project 24

Design extension railway yard Rail service centre Waalhaven

Zuid–Port of Rotterdam

TheproposedActionisrelevanttothecallforproposals,althoughitlacksdemonstrationofitsaddedvalue.Itisinprinciplereadytostartfromatechnicalpointofview.However,itisnotbackedupbyanyfeasibilitystudy.Theimpactasadecisionmakingtoolisnotclearasitclaimstopreparefinalstudieswhileitwouldalsoleadtoafinaldecisionregardingimplementationofworks.Othersocio-economicandenvironmentalbenefitsarenotsubstanti-ated. Overall, the proposal’s quality is poor as it lacksdetailandjustificationinallaspects.

Rotterdam, the largest port in Europe, plays a crucial role in the growth and development of Europe. With the share of intermo-

dal rail freight traffic increasing over the last years, to maintain and extend this share and thus to assure a further development of the port, a reduction of bottlenecks and capacity gaps on the hinterland rail corridor is required. The Waalhaven Zuid railway yard, located near Rotterdam’s Rail Service Centre, will become one of the ma-jor bottlenecks on the hinterland rail freight corridor at the Port of Rotterdam. The Global Project will reduce the capacity gap by adding more, high quality railway yard tracks to the existing rail network. This assures the increasing share of intermodal rail freight traffic between Rotterdam and its European hinterland. The proposed Ac-tion will carry out design studies for adding tracks with ancillary equipment to the current layout of Waalhaven Zuid.

PPs - New ActionMember States involved:The Netherlands

Applicant:ProRail B.V.

Requested fundingTotal eligible costs €2,912,235

TEN-T requested funding: €1,456,117

TEN-T funding: 50%

Recommended funding €0

The Global Project is aimed at matching the increaseddemand for freight rail transport on the Rotterdam-

Emmerich section of Priority Project 24 (Railway axis Lyon/Genova-Basel-Duisburg-Rotterdam/Antwerpen).TheproposedActionrelatestotheimprovementofaportterminalrailfacil-ityinRotterdambytheadditionofmorewagonsidingsandalocomotiveyard.

TheproposedActionisverygoodintermsofrelevanceandmaturity.ItclearlyrelatestoPriorityProject24andaimsattheoptimisationofcapacityandefficiency.How-ever,theproposaldoesnotprovideanyquantificationofthe proposed Action’s impact and lacks information, inparticularregardingmilestones,organisationandmoni-toring.Thereforeitsimpactcannotbeassessedwhilethequalityoftheproposalislow.

Extension railway yard Maasvlakte West-Port of Rotter-

dam: Rail Freight corridor 8 (PP24) - phase 2 implementation

2012-NL-24008-P • Part of Priority Project 24

PPs - New ActionMember States involved:The Netherlands

Applicant:ProRail B.V.

Requested fundingTotal eligible costs €76,449,000

TEN-T requested funding: €15,289,800

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

173

The proposal, part of Priority Project 12 (Nordic Trianglerailway/roadaxis),concernsthenorthwesternpartofthe

ring road of Stockholm. It contributes to the Norra LankenGlobalProjectaimingatimprovingtheaccessibilityconditionson the road network of northern Stockholm by broadeningtheroadsections.Assuch,theActionisintendedtoremoveacapacitybottleneckandincreaseaccessibilitytotheharbour.

Therelevanceoftheproposalislowastheactivitiesfin-ishingwithinthecalltimeframe(beforetheendof2015)willbring insufficientaddedvalueatEU level.Thepro-posedActioncanstartand isexpected to complementpastinvestmentswhichweresupportedundertheTEN-tprogramme.However,thequalityoftheproposalissuchthatitisnotpossibletofullyassessthescopeandim-pactoftheproposedAction.

The Western Link - railway tunnel in Gothenburg

TheproposedAction is relevant to the call for propos-als,verymatureandwithsignificantexpectedimpact.Itsquality isalsoverygood.However, taking intoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.

Theproposal isastudyfora9.7kmdoubletrackrailwaytunnel, includingthreestations,underGothenburgcity. It

is the last stepprior to initiating the constructionplan. TheActionispartoftheGlobalProject“WestSwedishAgreement”,a package of infrastructure projects targeting public trans-port,railwaysandroadsintheGothenburgarea.

TheprojectaimstoeliminateabottleneckonPriorityProject12 (Nordic Triangle railway/road axis) by allowing trains togothroughGothenburgstation,whichiscurrentlyadead-endstation.

2012-SE-12021-S • Part of Priority Project 12

PPs - New Action Member States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €58,104,846

TEN-T requested funding: €29,052,423

TEN-T funding: 50%

Recommended funding €0

Route E4 - Relieving of bottle-necks and increased capacity

west of Hagastaden

2012-SE-12026-P • Part of Priority Project 12

PPs - New ActionMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €54,736,000

TEN-T requested funding: €10,947,200

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

174

TheproposalconcernstheconstructionofthelastmissingmotorwaysectiononroadE6ofPriorityProject12(Nordic

Trianglerailway/roadaxis)betweenGothenburgandtheNor-wegianborder.Theworksforthe7.5kmnewmotorwaysec-tionPalen-Tanumshedeincludetheconstructionofsixbridg-es,atunnelandarestarea.

TheActionaimstoeliminateanimportantbottleneckonthewesternpartoftheNordicTriangleandimprovetheCopenha-gen-Gothenburg-Osloconnection.

TheproposedActionisrelevanttothecallforproposalssinceitaddressesabottleneckofPriorityProject12.Itsmaturityisevidentastheworksarealreadyunderway.AverygoodimpactisdemonstratedatregionalandEUlevel.Thequalityisverygood.However,givenitslocaldi-menssionandinlinewiththecallforproposalsprioritiessupportofthisActionwouldnotoptimizetheeffective-nessofEUfunding.

2012-SE-12044-P • Part of Priority Project 12

Final section of the E6 motorway Copenhagen-

Gothenburg-Oslo

Stockholm Bypass: development of construction

plans

TheproposedActionisrelevanttotheobjectivesandpri-orities of the call for proposals. It ismature since theprojecthasalreadystarted. Its impact ishigh, theout-comeofthestudiesbeingthebasisforthesubsequentworks’ procurement. Its quality is good. However, thetimeline of its implementation goes beyond 2015 andthusdoesnotcomplywiththecallrequirements.

Theproposalconsistsoffinaldesignstudiesandtheprepa-rationofthetenderdocumentsforthesubsequentworks

oftheStockholmbypass,anewmotorwaylinkingthesouthernandnorthernpartsofthecityandpartofPriorityProject12(NordicTrianglerailway/roadaxis).Thestudiescoverinteraliathedesignofsix interchanges(Kungenskurva,Lovo,Vinsta,Hjulsta,AkallaandHaggvik).

2012-SE-12036-S • Part of Priority Project 12

PPs - New ActionMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €116,405,000

TEN-T requested funding: €58,202,500

TEN-T funding: 50%

Recommended funding €0

PPs - New ActionMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €71,011,950

TEN-T requested funding: €14,202,390

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

175

TheAction concernsworks for the construction of a roadtunnelunderariverinGothenburg.Theworksencompass

the construction of 500 m motorway in tunnel with inter-changesandlinkstothenationalandlocalroadnetwork.Theproposal ispartof theGlobalProject “WestSwedishAgree-ment”, a package of infrastructure projects targeting publictransport,railwaysandroadsintheGothenburgarea.TheaimoftheActionistoeliminateabottleneckbyreducingconges-tionintheexistingtunnelofroadE6,partofPriorityProject12(NordicTrianglerailway/roadaxis)andtoprovideanewlinkbetweenthePortofGothenburgandroadsE45,E20andE6.

TheproposedActionhasamaturitythatisdemonstratedbynecessarycommitments.Itsimpactisveryhighasitaimsatimprovingsafety,accessibilityandflowofgoodsandpassengersonamajorEUaxis.Theproposal’squal-ity is very good as the activities are coherentwith itsobjectives.However,itsrelevancetothecallforpropos-alsisunderminedastheActionisnotlocatedonPriorityProject12directly,althoughitaddressesabottleneck.

2012-SE-12068-P • Part of Priority Project 12

E6.21 Marieholm TunnelThe priority project Cityline Stockholm – an important link

in the Nordic Triangle

TheproposedActionisrelevanttothecallforproposalsas itaddressesverywellTEN-Tandcall forproposal’sprioritiesbytargetingtheremovalofamajorbottleneckonPriorityProject12.Itisverymatureastheworksarealreadyongoing.Itsimpactisverywelldemonstratedatlocalandregionallevel.However,givenitslocaldimen-sionandinlinewiththecallforproposalsprioritiessup-portofthisActionwillnotoptimizetheeffectivenessofEUfunding.

The proposal concerns the removal of a rail bottleneckin Stockholm affecting thewhole network. The City Line

project is a 6 km long double-track tunnel with two newstationsbeneathcentralStockholm,aswellasincorporatinga1.4kmlongbridge.TheaimoftheActionistodoubletheexistingtrackcapacitythroughStockholm,thustocopewiththe increasingtransportdemandoftheregionand increasethepunctualityofrailservices.

2012-SE-12047-P • Part of Priority Project 12

PPs - New ActionMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €598,372,000

TEN-T requested funding: €119,674,300

TEN-T funding: 20%

Recommended funding €0

PPs - New ActionMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €114,757,208

TEN-T requested funding: €22,951,442

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

176

LocatedonPriorityProject13(RoadaxisUnitedKingdom/Ireland/Benelux), the proposal concernsworks along two

heavilycongestedsectionsoftheA14thatbypassthetownof Kettering. The foreseen activities include the completionofillustrativedesign,workstenderprocurement,preparatoryworks,andmainworksconstruction.

TheproposedAction is relevant to the call for propos-als,verymatureandwithsignificantexpectedimpact.Itsquality isalsoverygood.However, taking intoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.

2012-UK-13090-P • Part of Priority Project 13

Removing Bottlenecks on PP13: A14 J7-9 Kettering Bypass

Improvement

Removing bottlenecks on PP13: A75 Improvements

TheproposedActionisrelevantotthecallforpropsoalsas itaddressestheremovalofabottleneckonPriorityProject 13 and it is line with the TEN-T priorities. Thematurityof theproposedAction isverygoodsince theActionhasalreadycommenced.Theimpactandqualityaregood.However,givenitspredominantlylocalimpactandinlinewiththecallprioritiessupporttothethispro-posalwouldnotoptimizetheeffectivenessofEUfunding.

TheAction is locatedon theA75 road that extends fromGretnaandtheA74(M)intheeasttoStranraerinthewest,

formingpartofPriorityProject13(RoadaxisUnitedKingdom/Ireland/Benelux).It comprises the construction and completion of two bypasses:

•DunragitBypass(5.3km)•HardgrovetoKinmountimprovement(3.6km)

Thepurposeofbothschemesistoprovideanadditionalover-takingopportunity for traffic travellingalong this sectionofroad.TheexistingA75sectionswillbede-trunkedandusedasasideroadtoaccessexistingpropertieswithinthevicinity.

2012-UK-13039-P • Part of Priority Project 13

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested fundingTotal eligible costs €30,190,863.30

TEN-T requested funding: €6,038,173.68

TEN-T funding: 20%

Recommended funding €0

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested fundingTotal eligible costs €99,678,260

TEN-T requested funding: €19,935,651

TEN-T funding: 20%

Recommended funding €0

177

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Removing Bottlenecks on PP13: M6 J10a - 13

Managed Motorway Scheme

TheproposedActionismatureasnecessarypreliminarystepshavealreadybeenfulfilled.Itsimpactandqualityaregood.Althoughitaddressestheremovalofabottle-neckonPriorityProject13,itisprimarilyITSrelatedbutitisnotcompliantwiththerequirementsoftheITScall.

The proposal aims at providing a “managed motorway” scheme between junctions 10a-13 of the M6 motorway between

Birmingham and Manchester. This is a strategic route that carries high volumes of heavy goods (22% of traffic consists of HGVs). More precisely, the proposal consists of two distinct sections:

•Junctions 10a-11a: a controlled motorway technology (“man-agedmotorway”) isforeseentocontroltrafficflows, lanedisci-plineandspeedsmoreeffectivelythroughtheuseofoverheadgantries,lanespecificsignalsanddriverinformationsigns.Italsoenablesthehardshouldertobeusedasanextratrafficlanedur-ingperiodsofcongestion.

•Junctions11a-13:ahardshoulderrunningsolutionwillgiveex-tracapacityandgantrysigningwill controlspeedsat timesofcongestion

2012-UK-13091-P • Part of Priority Project 13

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested fundingTotal eligible costs €46,782,546

TEN-T requested funding: €9,356,508

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Port Salford – removing bottlenecks and improving in-termodality on PP26 and PP14

The proposed Action is very relevant to the call forproposals as it concerns a tri-modal terminal relatingto Priority Projects 26 and 14. It is verymature, withrequiredapprovalsinplaceandworksreadytostart.Verypositivesocio-economicimpactpotentialisforeseenwithallpositiveenvironmentalconsequences.Thequalityoftheproposalisverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.

Port Salford Intermodal Terminal will be the UK’s first tri-modal freight interchange, served by rail, inland waterway and road. It

will improve efficiency, inter-modality and reduce bottlenecks on Pri-orityProject14 (West coast main line) and PriorityProject26 (Rail-way/road axis Ireland/United Kingdom/continental Europe) and stim-ulate local and regional economic growth. Port Salford is a major part of a government-supported economic growth strategy called Atlantic Gateway. It is located on the Manchester Ship Canal, to the west of Manchester, and will be connected to the Liverpool-Manchester rail line via a new branch line. It will have a new wharf suitable for con-tainer vessels. Port Salford Intermodal Terminal will have a handling capacity of 283,000 TEUs and service up to 8 freight trains per day in this initial phase (up to 16 in future phases), with modal shift from road to rail and inland waterway leading to operational and environ-mental benefits on the TEN-T road network.

2012-UK-26017-P • Part of Priority Project 26

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested fundingTotal eligible costs €37,452,680

TEN-T requested funding: €7,490,536

TEN-T funding: 20%

Recommended funding €0

178

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

PP26: Improving intermodal access to Liverpool Port

TheproposedAction is ready tostart.However, it con-cernsafeasibilitystudythatwillnotleadtoimplementa-tion,thusfailingtomeettheobjectivesandprioritiesofthecallforproposals.TheActiondoesnotdemonstrateitsimpacttomultimodality,asitmainlyaimsatexpand-ing the existing road capacity to the port. The overallqualityoftheproposedActionisnotsound.Detailedandquantitativeinformationismissing.

TheActionconsistsoffeasibilitystudiesandoptionsassessments,toprovideevidenceforthedevelopmentofbusinesscasesforspe-

cificinterventionstoaddressbottlenecksonPriorityProject26(Rail-way/roadaxisIreland/UnitedKingdom/continentalEurope)fromIre-land/UK/continentalEuropeattheLiverpoolnode.ThemainobjectiveoftheActionistotacklethefreightbottleneckattheLiverpoolnodeonPriorityProject26,inordertomeetthetransportneedsoffutureportexpansion.TheoutputfromeachActivitywillbeusedtosupportthedeliveryofamulti-modalworkprogrammetoaddressportaccess.ThecontributiontomanagingtrafficandreducingthebottlenecksonPri-orityProject26ofeachoftheproposedinterventionswouldbecom-pared.Thiswouldbeusedtoprovideevidenceforimplementingamulti-modalapproachtotacklingthefreightbottleneckintheLiverpoolcityregion.

2012-UK-26065-S • Part of Priority Project 26

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested fundingTotal eligible costs €1,118,400

TEN-T requested funding: €559,200

TEN-T funding: 50%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposalconcernstransformationofrailtravelacrossthenorthofEnglandwithshorter journey timesand the

capacityformoreservicesperhouronsmarterroutesbetweentownsandcities.Inparticular,theActioncoverscompletionofamissingrailwaylinkbetweenManchester’sVictoria,OxfordRoadandPiccadillystations;extensionoftracksbetweenRobyand Huyton Junction on the Liverpool-Manchester line andconstructionofanadditionalplatformandassociatedrailwayinfrastructureat theManchesterAirportStation. It isapartofaGlobalProjectthatcoverscompletionofPriorityProject26(Railway/roadaxisIreland/UnitedKingdom/continentalEu-rope)intheUK.

The relevanceof theproposedAction is highas it ad-dressesabottleneck,primarilyrelatedtothepassengerrailwaytransport, intheareaofManchesteronPriorityProject26.Ithasaconsiderablepositiveimpactonpas-sengertransportmodalshift.Theoverallqualityoftheproposalisgood.However,thematurityoftheactioniscompromised by pending authorizations, which put atriskthetimelineforfinalisationby2015,asstipulatedinthecallforproposals.

2012-UK-26062-S • Part of Priority Project 26

Completing PP26 (Liverpool-Hull) and delivering the TEN-T core rail network in the United Kingdom:

Northern Hub

PPs - New ActionMember States involved:United Kingdom

Applicant:Department for Transport

Requested fundingTotal eligible costs €114,267,458.90

TEN-T requested funding: €22,853,41.57

TEN-T funding: 20%

Recommended funding €0

179

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Works for construction of new high speed line between Kundl/

Radfeld and Baumkirchen

2012-AT-01080-P • Part of Priority Project 1

PPs - Ongoing ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested fundingTotal eligible costs €86,400,000

TEN-T requested funding: €12,960,000

TEN-T funding: 15%

Recommended funding €0

TheproposedAction concerns a request for an increasedsupportratefrom5%to20%forAction2007-AT-01130-P

(Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo).ItconcernstheconstructionofanewdoubletrackhighspeedraillineforfreightandpassengertrafficbetweenKundl/Radfeld andBaumkirchen in the Lower InnValley, anidentifiedbottleneckofPriorityProject1(RailwayaxisBerlin-Verona/Milano-Bologna-Napoli-Messina-Palermo).

TheprojectwillcontributetothecompletionoftheMunich-Milansection,inparticulartothenorthernaccesstotheBren-nerBaseTunnelbetweenAustriaandItaly.

Linked to Action 2007-AT-01130-P

Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.

TheproposedAction concerns a request for an increasedsupportratefrom14.03%to20%fortheAction2007-AT-

17040-P(WorksandstudiesforupgradingtheWien-Bratislavarailwayline:6sub-projects).PartofPriorityProject17,Railwayaxis Paris-Strasbourg-Stuttgart-Wien-Bratislava, the Actionincludesthethreemainworks:

•ConnectionofnewVienna’sCentralrailwaystationtoEast,WestandSouthrailwaystations(6km)

•NewGötzendorferjunction•Klederingloop:connectionbetweenVienna’sCentralrail-waystationandViennaAirport

Linked to Action 2007-AT-17040-P

Works and studies for upgrad-ing the Wien-Bratislava railway

line (6 subprojects)

2012-AT-17045-P • Part of Priority Project 17

PPs - Ongoing ActionMember States involved:Austria

Applicant:Bundesministerium für Verkehr, Innovation und Technologie

Requested fundingTotal eligible costs €377,480,000

TEN-T requested funding: €60,283,557

TEN-T funding: 15.97%

Recommended funding €0

180

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.

T he proposed Action requests an increased TEN-T support rate from 5.59% to 20% for the ongoing Action 2007-BE-02030-P

(Diabolo - Rail link between Brussels Zaventem airport and the Tha-lys high speed train network).It aims at building two rail connections as part of the “Diabolo” Global Project, which aims to link Brussels Airport to the Brussels-Antwerp line:

•The new double track L25N between Mechelen andBrussels,includingaconnectiontothenewline36C(tunnel).

•Asingletrackbranch(line36C/2),whichconnects line26withthenewline25NatHaren,allowingtrainscomingfromtheBrus-sels-SchumanstationtoconnectdirectlytoBrusselsAirport.

Linked to Action 2007-BE-02030-P

Diabolo - Rail link between Brussels Zaventem airport and

the Thalys high speed train network

2012-BE-02104-P • Part of Priority Project 2

PPs - Ongoing ActionMember States involved:Belgium

Applicant:Infrabel SA

Requested fundingTotal eligible costs €32,255,511.32

TEN-T requested funding: €6,451,102.26

TEN-T funding: 20%

Recommended funding €0

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.

Theproposalisarequestforanincreaseoftheco-fundingrate from 5% to 20% for the ongoing action 2007-BE-

28050-P (EuroCap-Rail modernisation de l’axe ferroviaireBruxelles-Luxembourg).Thisprojectconsistsofthemoderni-sationofthesectionoflines161/162betweentheLouvain-la-Neuve junction and the Belgium-Luxembourg border, inordertosubstantiallyincreaseitscommercialspeed.

Linked to Action 2007-BE-28050-P

EuroCap-Rail

2012-BE-28111-P • Part of Priority Project 28

PPs - Ongoing ActionMember States involved:Belgium

Applicant:Infrabel SA

Requested fundingTotal eligible costs €194,513,459.12

TEN-T requested funding: €38,902,691.83

TEN-T funding: 20%

Recommended funding €0

181

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

Theproposalforanincreasedco-fundingratewaswellpresented. However, taking into account the scarcityof available funds in this area in linewith the call forproposals,anincreaseofTEN-Tfundingwouldnotpro-duceanyaddedvalue.

The main objective of the Action is to facilitate a modal shift from road to sea by providing more efficient transport solutions and improving

access to markets in Central and Northern Europe — especially in the Baltic Sea region. This will relieve the main roads of Central and Northern Europe of excessive heavy cargo transports and result in a significant reduction of the forecast future pressure on sea ports in continental Europe.

The Baltic Sea hub and spokes system is a joint action for the ports of Gothenburg, Aarhus and Tallinn. The three ports represent a large region, whose unique location is close to large markets in both the east and west. On this basis and considering the size and facilities of the ports, the region has a huge potential to attract large transnational carriers. In a wider perspective and in a later phase, the action will also aim to include other ports in the Baltic Sea geographical area and neighbouring countries.

Linked to Action 2010-EU-21108-P

PPs - Ongoing ActionMember States involved:Denmark, Estonia, Sweden

Applicant:Municipality of Aarhus

Requested fundingTotal eligible costs €83,664,640

TEN-T requested funding: €21,450,401

TEN-T funding: 25.64%

Recommended funding €0

Baltic Sea Hub and Spokes project

2012-EU-21028-P • Part of Priority Project 21

NOT RECOMMENDED FOR FUNDING

Evaluation remarks

TheproposedActionconcernsarequestforincreasedTEN-Tfundingfrom5,69%to20%forAction2007-SE-12090-

(Works for construction of road sectionNorra Länken). ThisprojectconsistsofworksontheringroadofStockholmlinkingroadE4andE20totheharbourthroughatunnelsystem.

Linked to Action 2007-SE-12090-P

TheproposedincreaseofTEN-Tsupportishighlyrele-vanttothecallforproposalsasitisexpectedtofacilitatethe smooth implementation of theAction. TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.However,takingintoaccountthescarcityofavailablefundsinthisareainlinewiththecallforpro-posals,anincreaseofTEN-Tfundingwouldnotproduceanyaddedvalue.

PPs - Ongoing ActionMember States involved:Sweden

Applicant:Trafikverket

Requested fundingTotal eligible costs €251,632,809

TEN-T requested funding: €50,326,561

TEN-T funding: 20%

Recommended funding €0

Works for construction of the road section Norra Länken (Northern Link): Increased

support2012-SE-12020-P • Part of Priority Project 12