Introduction ..............................................................................................................................................................................4
1. The legal framework and political context of the 2012 Multi-Annual Call for Proposals ..............5
2. Key elements of proposals received under the 2012 Multi-Annual Call for Proposals ...................71. General overview ...............................................................................................................................................................................................72. Budgetary features ...........................................................................................................................................................................................73. The selection of proposals ...........................................................................................................................................................................74. TEN-T Funding – Map representations of the proposals recommended for funding ...............................................105. List of proposals recommended for funding ..................................................................................................................................186. List of proposals NOT recommended for funding ........................................................................................................................26
3. Info Sheets of project proposals submitted under the 2012 TEN-T Multi-Annual Call for Proposals ................................................................................................................................................................................341. Info sheets of proposals recommended for funding ..................................................................................................................352. Info sheets of proposals NOT recommended for funding ....................................................................................................131
4
Introduction
Since 1995, the European Union has the possibility of granting financial aid to projects of common interest included in the EU Guidelines for the development of the Trans-European Transport Network (TEN-T). The TEN Regulation1 of the European Parliament and of the Council, adopted in 2007, enables the Commission to contribute more efficiently and effectively to the financing of the highest priorities of the TEN-T. Under the 2007-2013 financing framework, the entire €8,013 million budget has been allocated to date. The allocated funds have been contributing to the gradual implementation of this network. Under the Multi-annual programme (80 to 85% of the available budgetary resources) the TEN Regulation provides for a strong concentration of available funds on the TEN-T Priority Projects approved in 2004 and on projects in the field of traffic management, and promotes in particular the enhanced sup-port of cross-border sections along the Priority Projects. Amongst the supported projects are actions of key European added value such as cross-border sections and key bottlenecks of the TEN-T as well as horizontal priorities. In ad-dition the assistance of European Co-ordinators on certain Priority Projects, help to overcome difficulties through ‘non-financial’ action.
Under the Annual work programme (15 to 20% of the available budgetary resources) the TEN Regulation provides the financing of a large number of smaller projects covering the different modes of transport. They projects are also hav-ing significant effects on the achievement of the EU’s objectives in this area, notably through project pipeline prepa-ration (feasibility studies, impact assessment and design studies). Much has thus already been achieved through the joint funding of important TEN-T projects by Member States and the EU. On this basis the Commission, in coordination with the TEN-T Executive Agency (TEN-T EA), published on 28 November 2012 under the Multi-annual Programme a Call for proposals2 with a total indicative budget of €1,347 million3 broken down to the following fields:
•AirTrafficManagement(ATM)withanindicativebudgetof€50million;•EuropeanRailTrafficManagementSystems(ERTMS)withanindicativebudgetof€100million;•IntelligentTransportSystems(ITS),includingEuropeanElectronicTollService(EETS)withanindicativebudgetof€50million;•MotorwaysoftheSea(MoS)withatotalindicativebudgetof€80million;•RiverInformationServices(RIS)withanindicativebudgetof€10million;•PriorityProjects(PPs)withatotalindicativebudgetof€1,057million.
This call is based on the TEN Regulation as well as the specific Commission Implementing Decisions on the Multi-an-nual Work Programmes for grants in the field of the TEN-T network for 2012 and 20134, which were adopted through the Comitology procedure in November 2012 and March 2013 respectively. Under this call, a total of 197 project proposals were received, of which 189 fulfilled the formal eligibility criteria. In evaluating these proposals, the Com-mission, in collaboration with the TEN-T Executive Agency, strictly applied the criteria set out in the TEN Regulation and in the 2012 and 2013 Multi-annual Work Programmes. The involvement of external experts in the evaluation of all eligible proposals enhanced the objectivity and technical quality of the overall selection process. The Commission, with the support of the TEN-T Executive Agency, has completed the evaluation and selection process of proposals on the basis of the TEN-T 2012 and 2013 Multi-annual Work Programmes. It intends to adopt a decision that sets out the results of this process, i.e. a decision that, in accordance with Article 9 of the TEN Regulation, establishes the projects to be selected under the 2012 and 2013 Multi-annual Work Programmes and the amounts of financial aid to be granted to these projects. The Commission is confident that the funding proposal outlined on the following pages responds, in the best possible way, to key transport and TEN-T policy objectives, and that it contributes to supporting EU action in the field of the Trans-European Transport Network. The first part of this brochure sets the legal frame-work and political context of the 2012 Multi-annual call. The second part presents the key elements of the proposals received under the call in the targeted fields. It contains information on the selection process and its outcome as well as information about the individual proposals including maps for the proposals recommended for funding. Finally, the brochure also includes lists of proposals recommended and not recommended for funding.
1 Regulation (EC) 680/2007 of the European Parliament and of the Council of 20 June 2007, laying down general rules for the granting of EU financial aid in the field of the trans-European transport and energy networks as amended by Regulation 670/2012 of the European Parliament and of the Council of 11 July 2012
2 EN Official Journal of the European Union C 368/16, 28 November 2012
3 €1,015 million were allocated through the amendment of the 2012 Work Programme and another €332 million through the 2013 Multi-annual Work Programme
4 Commission Decision C(2012)1574 as amended by Commission Decision C(2012) 8508, as well as 2013 Multi-annual Work Programme C (2013)1675 adopted on 21 March 2013
5
1. The legal framework and political context of the 2012 Multi-Annual Call for Proposals
In coherence with Regulation (EC) No 680/2007 of the European Parliament and the Council laying down general rules for the granting of EU financial aid in the field of Trans-European Networks (the ‘TEN Regulation’), the Commis-sion Decision C(2012) 1574 as amended by Commission Decision C(2012) 8508 of 27 November 2012, as well as the 2013 Multi-annual Work Programme1 adopted on 21 March 2013 established the 2012 and 2013 Multi-annual Work Programmes for granting financial aid in the field of the Trans-European Transport Network (TEN-T). These Multi-annual Work Programmes led to the publication on 28 November 2012 of a Call for proposals in the framework of TEN-T (published in the Official Journal of the European Union C 368/16 on 28 November 2012).
The Work Programmes and the amendment, where applicable, include a total amount of €1,347 million broken down in the following fields:
•AirTrafficManagement(ATM)withanindicativebudgetof€50million;•EuropeanRailTrafficManagementSystems(ERTMS)withanindicativebudgetof€100million;•IntelligentTransportSystems(ITS),includingEuropeanElectronicTollService(EETS)withanindicativebudgetof€50million;•MotorwaysoftheSea(MoS)withatotalindicativebudgetof€80million;•RiverInformationServices(RIS)withanindicativebudgetof€10million;•PriorityProjects(PPs)withatotalindicativebudgetof€1,057million.
The objectives of each field were defined in the 2012 Multi-annual Work Programme and its amendment:
Air Traffic Management (ATM)The objective in this area is to implement Single European Sky and ATM modernisation objectives based on the restructuring of European airspace and the way in which it is organised and managed (Functional Airspace Blocks) and on the implementation of the technologies and procedures to modernise the European ATM system (SESAR pro-gramme).
The creation of Functional Airspace Blocks is a key step in the reduction of fragmentation and the consolidation of air traffic service provision in the medium term through the reorganisation of airspace and the way in which it is man-aged. It will necessitate the rationalisation of infrastructure and the achievement of a harmonised technical baseline. It constitutes a transitional phase for the restructuring of ATM in the EU and will facilitate the implementation of the SESAR systems in the longer term.
The objective of the SESAR programme is the modernisation of the ATM systems through the definition, develop-ment, validation and implementation of new ATM infrastructure in Europe to increase capacity, enhance safety and interoperability and reduce environmental impact to meet traffic growth to 2020 and beyond.
European Rail Traffic Management Systems (ERTMS)The overall objective, based on Article 10 of the TEN-T Guidelines, is to promote the deployment of the European Rail Traffic Management System (ERTMS) which today consists of two components GSM-R and ETCS (the European Train Control System).
Through the elimination of technical barriers to interoperability, the deployment of ERTMS will directly contribute to the achievement of key transport policy objectives such as: the establishment of major interoperable transport axes interconnecting national networks and facilitating the functioning of the internal market; the optimal use of existing infrastructure capacities; improving the safety and reliability of the network; enhancing accessibility of peripheral areas of the Union; facilitating congestion relief on rail infrastructure and more balanced modal distribution; savings in terms of the environmental effects of transport.
1 C (2013)1675
6
Intelligent Transport Systems (ITS), including the European Electronic Toll Service (EETS)The priorities for ITS including EETS are:
•The“optimisationofthecapacityandefficiencyofexistingandnewinfrastructure,promotionofintermodalityandimprovementofthesafetyandreliabilityofthenetworkbyestablishingandimprovingintermodalterminalsandtheiraccessinfrastructureand/orbydeployingintelligentsystems(art.5oftheTENguidelines);•“Thenetworkshallalsoincludeinfrastructurefortrafficmanagement,userinformation,dealingwithincidentsandemergenciesandelectronicfeecollection,suchinfrastructurebeingbasedonactivecooperationbetweentrafficmanagementsystemsatEuropean,nationalandregionallevelandprovidersoftravelandtrafficinformationandvalueaddedservices,whichwillensurethenecessarycomplementaritywithapplicationswhosedeploymentisfacilitatedunderthetrans-Europeantelecommunicationsnetworksprogramme.”(art.9oftheTENGuidelines).
River Information Services (RIS)The overall objective, based on Article 11.5 and 16 of the TEN Guidelines, is to foster the deployment of “RIS Intel-ligent Infrastructure”, reflecting a European wide harmonised implementation of River Information Services (RIS), regulated through Directive 2005/44/EC2 which defines binding rules for data communication and RIS equipment as well as the minimum level of RIS Services for future RIS implementations. The Directive provides the framework for the deployment of harmonised and interoperable RIS systems and services across Europe.
For the programming period of 2007-2013, projects shall focus on the deployment of enabling infrastructure and on the provision of River Information Services. The multiplicity of these services requires a high level of interoperability and compatibility of the services themselves, of the enabling technologies behind and of the related processes.
In order to support the co-ordinated implementation of RIS in Europe, the TEN-T RIS Masterplan inventorised national ongoing and planned RIS activities as well as investment plans and identified a number of technical issues which are considered key priorities in the context of the TEN-T programme. It further identified a number of legal and organi-sational issues, which would need to be addressed at a certain point in order to optimise the benefits of RIS and to ensure a co-ordinated, harmonised and synchronised implementation in the different countries involved.
Priority Projects concerning rail, road and inland waterways (PPs)The programme aims at channelling Union aid at supporting sections of priority projects (in the rail, road and inland waterway sectors) which promise the highest added value for the projects as a whole, i.e. cross-border sections, innovation actions and the removal of bottlenecks. This area addresses also ongoing Actions on PPs that applied for higher co-funding rates.
2 OJ L 255, 30.9.2005, p. 152–159
7
2. Key elements of proposals received under the 2012 Multi-Annual Call for Proposals
1. General Overview197 proposals were received in response to the 2012 Multi-annual Calls for proposals. 189 of these proposals were eligible and addressed the EU and transport priorities set out in the amended Multi-annual Work Programme 2012 as well as the Multi-annual Work Programme 2013.
2. Budgetary featuresThe total amount requested by applicants for the 2012 Multi-annual Calls in the eligible proposals was €5,727,775,792 while the total indicative budget for the call was €1,347 million for the six fields.
Table 1: Eligible proposals including the requested funding and indicative budget by priority
Priority Number of eligible proposals
Requested TEN-T funding (€ million)
Budget available (€ million)
ATM 9 107.48 50
ERTMS 27 250.73 100
ITS-EETS 12 206.62 50
MoS 22 212.65 80
RIS 4 3.43 10
PPs 115 4,946.82 1,057
TOTAL 189 5,727.77 1,347
As evidenced above, all fields were largely oversubscribed except for River Information Services (RIS).
3. The selection of proposalsThe selection process was carried out in three steps:
1. An external evaluation of proposals was organised by the TEN-T Executive Agency. The technical appraisal of each proposal against four blocks of award criteria (relevance, maturity, impact and quality) was made individually by at least three external experts. These experts then discussed each proposal and agreed on a consensus recom-mendation for or against funding and on a score for each of the four blocks of award criteria. This evaluation by external experts, which did not take into consideration the budgetary constraints, led to the recommendation of 134 proposals representing a total TEN-T requested funding of €5,249,827,671.30, which was 3.9 times more than the available budget (€1,347 million).
2. An appraisal in relation to the EU transport policy priorities and the objectives and restrictions set by the 2012 Multi-annual Call was undertaken internally, on the basis of the policy-related aspects mentioned in the ‘final se-lection process’ section of the call texts. An Internal Evaluation Panel, composed of representatives of DG MOVE, the TEN-T Executive Agency and DG ENV reviewed each proposal individually, to cut any costs and/or activities that would not be eligible or not recommended for funding. It also considered each proposal in view of the TEN-T objectives and priorities and its compliance with EU environmental law.
3. Finally, the Evaluation Committee composed of DG MOVE and TEN-T EA Directors confirmed the recommendation of the Internal Evaluation Panel.
Overall, the external and internal evaluation process resulted in recommending 89 proposals representing a total TEN-T funding of €1,348,385,369 (see Figure 1). Therefore, the indicative budget of €1,347 million will be entirely consumed together with unallocated amounts (€2,781,500) from the 2012 Annual call for proposals. Only proposals receiving a positive recommendation from the external evaluation were recommended for funding.
8
Figure 1: Overview of the evaluation process
The final results of the 2012 Multi-annual Calls including the repartition of the requested TEN-T funding per priority are detailed in Table 2 as well as in Figures 2 and 3.
Table 2: Proposals eligible/recommended for funding by field/priority area
Field Number of eligible proposals
Requested TEN-T funding (€ million)
Number of proposals recommended for
funding
Recommended TEN-T funding (€ million)
ATM 9 107.48 3 58.80
ERTMS 27 250.73 14 68.33
ITS-EETS 12 206.62 2 3.58
MOS 22 212.65 13 169.37
RIS 4 3.43 4 3.43
PPs - Total 115 4,946.82 53 1,044.84
PPs new actions 95 2,983.36 39 731.39
PPs ongoing actions 20 1,963.46 14 313.45
TOTAL 189 5,727.77 89 1,348.38
Proposals recommended for funding offer a wide coverage in all fields as described in the Work Programmes and the call texts. In terms of transport modes, there is a clear predominance of rail while Motorways of the Sea also received a high attention by applicants.
189
134
89
0
20
40
60
80
100
120
140
160
180
200
Eligible proposals Recommendedproposals
(External Evaluation)
Recommendedproposals
(Internal Evaluation)
5,727.8
4,311.2
1,348.4 1,347
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
RequestedTEN-T funding
(Eligibleproposals)
RecommendedTEN-T funding
(ExternalEvaluation)
RecommendedTEN-T funding
(InternalEvaluation)
Indicative budget
Number of proposals TEN-T funding ( million)
9
Figure 3. Recommended proposals and TEN-T funding per Priority Project
Figure 4. Recommended proposals and TEN-T funding per project type
Figure 2: Recommended proposals and TEN-T funding per field
TEN-T funding ( million)
( ) = Number of recommended proposals
111.3(4)
147.7(6)
9.9(1)
141.1(4)
5.7(1)
139.8(4)
22.1(2)
2.8(1)
90.2(5)
43.2(3)
73(2)
76.5(4)
1.6(2)
68.4(4)
51.6(5)
10(2)
38.8(2)
11.2(1)
0
20
40
60
80
100
120
140
160
PP01 PP03 PP04 PP06 PP08 PP12 PP13 PP16 PP17 PP18 PP19 PP20 PP22 PP24 PP26 PP27 PP28 PP30
Mill
ions
TEN-T funding ( million)
58.8(3)
68.3(14) 3.6
(2)
169.4(13)
3.4(4)
731.4(39)
313.5(14)
0
100
200
300
400
500
600
700
800
ATM ERTMS ITS-EETS MOS RIS PPS: Newaction
PPS: Ongoingaction
( ) = Number of recommended proposals
TEN-T funding ( million)
392.4(40)
956(49)
0
200
400
600
800
1,000
1,200
Study Work
( ) = Number of recommended proposals
18 19
5. P
ropo
sals
rec
omm
ende
d un
der
the
2012
TEN
-T M
ulti
-Ann
ual C
all f
or P
ropo
sals
AT
M -
Air
Traffi
c M
anag
emen
t
ERTM
S -
Euro
pean
Rai
l Tra
ffic
Man
agem
ent
Syst
em
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-EU
-400
03-S
Activ
ities
to s
uppo
rt th
e im
plem
enta
-tio
n of
the
IDP
with
in D
ANU
BE F
ABSt
ate
Ente
rpris
e “B
ulga
rian
Air
Traffi
c Se
rvic
es A
utho
r-ity
” BU
LATS
A
EUSt
udy
2,78
8,42
01,
394,
210
50%
2,78
8,00
01,
394,
000
50%
2012
-EU
-400
04-P
ANSP
s In
terim
D
eplo
ymen
t Pr
o-gr
amm
e Im
plem
enta
tion
ENAV
S.p
.A.
EUW
ork
253,
778,
950.
5550
,755
,790
.11
20%
253,
775,
000
50,7
55,0
0020
%
2012
-EU
-400
06-S
Acce
lera
ting
the
Dep
loym
ent
of A
d-va
nced
FD
P Ca
pabi
litie
s in
Eur
ope
NAT
S (E
N R
OU
TE) P
LCEU
Stud
y13
,310
,512
.70
6,65
5,25
6.35
50%
13,3
10,0
006,
655,
000
50%
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-BE-
6002
7-P
Equi
pem
ent
of
ETCS
1 on
H
SL
L2,
upgr
ade
of H
SL L
3 an
d L4
to
ETCS
2 v2
.3.0
d, e
quip
men
t of
ETC
S1 v
2.3.
0d
on L
10 a
nd L
36C/
2
Infr
abel
nv
BEW
ork
23,9
54,5
8011
,977
,290
50%
23,8
54,0
0011
,927
,000
50%
2012
-DE-
6001
3-P
ETCS
eq
uipm
ent
of
DB
Sche
nker
Ra
il lo
com
otiv
es
for
inte
rope
rabl
e fr
eigh
t tr
affic
in A
ustr
ia (T
EN-T
Prio
r-ity
Pro
ject
17
and
ERTM
S Co
rrid
or B
)
DB
Sche
nker
Rai
l AG
DE
Wor
k3,
750,
000
1,87
5,00
050
%2,
250,
000
1,12
5,00
050
%
2012
-DE-
6001
4-P
ETCS
equ
ipm
ent
of D
B Sc
henk
er R
ail
loco
mot
ives
for
inte
rope
rabl
e fr
eigh
t tr
affic
on E
RTM
S Co
rrid
or A
DB
Sche
nker
Rai
l AG
DE
Wor
k8,
850,
000
4,42
5,00
050
%8,
850,
000
4,42
5,00
050
%
2012
-DE-
6002
5-P
Upg
rade
, pro
toty
ping
, ret
rofit
ting
and
test
ing
LOKO
MO
TIO
N lo
com
otiv
es t
o ET
CS 2
.3.0
d / B
asel
ine
3
Loko
mot
ion
Ges
ells
chaf
t fü
r Sc
hien
entr
aktio
n m
bHD
EW
ork
9,09
0,00
01,
800,
000
19.8
0%9,
090,
000
1,80
0,00
019
.80%
2012
-DK-
6000
2-P
Early
dep
loym
ent
of E
RTM
S Ba
selin
e 3
in D
enm
ark
Bane
danm
ark
(Rai
l N
et
Den
mar
k)D
KW
ork
117,
967,
095
58,9
83,5
4750
%40
,000
,000
20,0
00,0
0050
%
2012
-EU
-600
20-P
Dep
loym
ent
of
ERTM
S O
n Bo
ard-
equi
omen
t in
Sw
eden
201
2-20
15Tr
afikv
erke
tEU
Wor
k90
,090
,000
30,3
25,0
0033
.66%
24,3
50,0
008,
198,
000
33.6
7%
2012
-EU
-600
22-S
Faci
litat
ing
and
spee
ding
up
ERTM
S -
2nd
phas
eEE
IG E
RTM
S U
sers
Gro
upEU
Stud
y15
,083
,000
7,54
1,50
050
%6,
346,
000
3,17
3,00
050
%
2012
-EU
-600
33-P
CEE
goes
ECT
SCa
rgoS
erv
Gm
bhEU
Wor
k5,
303,
069
1,65
9,57
031
.29%
5,30
3,00
01,
659,
000
31.2
8%
18 19
2012
-IT-
6000
9-P
Off
-site
and
fiel
d te
stin
g to
sup
port
Ita
lian
ERTM
S m
igra
tion
stra
tegy
MIN
ISTE
RO
DEL
LE
IN-
FRAS
TRU
TTU
RE
E D
EI
TRAS
PORT
I
ITW
ork
6,00
0,00
03,
000,
000
50%
4,82
2,00
02,
411,
000
50%
2012
-IT-
6001
2-P
Equi
pmen
t of
ET
R 10
00
trai
nset
s w
ith E
TCS
Base
line
2 re
leas
e 2.
3.0d
Tren
italia
SpA
ITW
ork
5,35
5,00
02,
677,
500
50%
2,85
8,00
01,
429,
000
50%
2012
-IT-
6001
8-P
Upg
rade
of
Rom
a-N
apol
i hig
h sp
eed
line
in o
rder
to
ensu
re c
ompa
tibili
ty
with
ERT
MS
base
line
2.3.
0d
MIN
ISTE
RO
DEL
LE
IN-
FRAS
TRU
TTU
RE
E D
EI
TRAS
PORT
I
ITW
ork
6,00
0,00
03,
000,
000
50%
6,00
0,00
03,
000,
000
50%
2012
-NL-
6000
5-P
Maa
svla
kte
2 ER
TMS
Port
of
Rott
erda
mN
LW
ork
11,0
89,8
395,
544,
919
50%
1,80
0,00
090
0,00
050
%
2012
-NL-
6000
6-P
An E
TCS
base
line
230d
and
3.0
pro
-gr
am f
or i
nsta
llatio
n, u
pgra
de a
nd
prot
otyp
ing
of v
ario
us t
ypes
ele
ctri-
cal f
reig
ht lo
com
otiv
es f
or u
sage
on
mul
tiple
TEN
-T f
reig
ht c
orrid
ors
and
conv
entio
nal n
etw
orks
Mits
ui R
ail
Capi
tal
Euro
pe
B.V.
NL
Wor
k44
,117
,872
19,9
58,9
3645
.24%
2,00
0,00
01,
000,
000
50%
2012
-SE-
6002
8-S
Upg
rade
to
an u
nifo
rm s
wed
ish
sys-
tem
req
uire
men
t fo
r ER
TMS,
Lev
el2
Trafi
kver
ket
SESt
udy
14,5
81,7
557,
290,
876
50%
14,5
80,0
007,
290,
000
50%
ITS/
EETS
- In
telli
gent
Tra
nspo
rt S
yste
ms/
Euro
pean
Ele
ctro
nic
Toll
Serv
ice
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-EU
-500
05-S
Euro
pean
ITS
Plat
form
(EIP
)M
inis
tero
del
le I
nfra
stru
t-tu
re e
dei
Tra
spor
ti -
Di-
rezi
one
gene
rale
pe
r lo
sv
ilupp
o de
l te
rrito
rio,
la
prog
ram
maz
ione
e i
pro
-ge
tti i
nter
nazi
onal
i
EUSt
udy
11,9
19,9
505,
959,
975
50%
2,70
0,00
01,
350,
000
50%
2012
-EU
-500
09-S
Regi
onal
Eu
rope
an
Elec
tron
ic
Toll
Serv
ice
(REE
TS T
EN)
Auto
bahn
en-
und
Schn
ell-
stra
ßen-
Fina
nzie
rung
s-Ak
-tie
nges
ells
chaf
t (A
SFIN
AG)
EUSt
udy
5,24
4,60
52,
622,
302.
5050
%4,
470,
000
2,23
5,00
050
%
20 21
MoS
- M
otor
way
s of
the
Sea
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-EU
-210
03-P
LNG
Rot
terd
am G
othe
nbur
gLN
G B
reak
Bul
k Ro
tter
dam
CV
EUW
ork
184,
008,
970
36,8
01,7
9420
%17
1,36
4,00
034
,272
,000
20%
2012
-EU
-210
06-S
SEAG
ASB.
A.I.B
RETA
GN
E AN
GL-
ETER
RE IR
LAN
DE
SA (
BRIT
-TA
NY
FERR
IES)
EUSt
udy
2,08
2,64
41,
225,
321
58.8
3%2,
082,
000
1,04
1,00
050
%
2012
-EU
-210
07-S
MO
NAL
ISA
2.0
Swed
ish
Mar
itim
e Ad
min
-is
trat
ion
EUSt
udy
24,3
16,0
9612
,158
,048
50%
24,3
16,0
0012
,158
,000
50%
2012
-EU
-210
08-S
Win
ter
Nav
igat
ion
Mot
orw
ays
of t
he
Sea,
WIN
MO
SSw
edis
h M
ariti
me
Adm
in-
istr
atio
nEU
Mix
142,
330,
507
29,6
77,7
7020
.85%
142,
330,
000
29,6
77,0
0020
.85%
2012
-EU
-210
09-P
Pilo
t: LN
G B
unke
ring
Infr
astr
uctu
re
Solu
tion
and
Pilo
t ac
tions
for
Shi
ps
oper
atin
g on
the
Mot
orw
ay o
f th
e Ba
ltic
Sea
SSPA
Sw
eden
AB
EUM
ix76
,059
,772
23,1
03,3
8730
.38%
76,0
59,0
0023
,103
,000
30.3
8%
2012
-EU
-210
10-S
PILO
T SC
RUBB
ER –
New
Gen
erat
ion
Ligh
twei
ght
Pilo
t Sc
rubb
er S
olut
ion
inst
alle
d on
a R
o-Ro
Shi
p op
erat
ing
on t
he M
otor
way
of
the
Balti
c Se
a
SSPA
Sw
eden
AB
EUSt
udy
13,5
83,6
506,
791,
824
50%
13,5
83,0
006,
791,
000
50%
2012
-EU
-210
11-P
TWIN
-PO
RTPo
rt o
f H
elsi
nki
EUW
ork
56,3
00,0
0011
,260
,000
20%
56,3
00,0
0011
,260
,000
20%
2012
-EU
-210
13-S
Kvar
ken
Mul
timod
al L
ink
- M
idw
ay
Alig
nmen
t of
the
Bot
hnia
n Co
rrid
orN
LC F
erry
Ab
Oy
EUM
ix23
,609
,015
8,50
6,76
836
.03%
20,7
34,0
006,
129,
000
29.5
6%
2012
-EU
-210
17-S
Met
hano
l: Th
e m
arin
e fu
el o
f th
e fu
-tu
reSt
ena
Aktie
bola
gEU
Stud
y22
,502
,000
11,2
51,0
0050
%22
,502
,000
11,2
51,0
0050
%
2012
-EU
-210
19-S
ANN
A -
Adva
nced
Nat
iona
l Net
wor
ks
for
Adm
inis
trat
ions
Min
istr
y of
In
fras
truc
-tu
re a
nd t
he E
nviro
nmen
t (K
ingd
om o
f Th
e N
ethe
r-la
nds)
EUSt
udy
37,0
76,4
3718
,538
,219
50%
37,0
76,0
0018
,538
,000
50%
2012
-EU
-210
20-S
Busi
ness
to
Mot
orw
ays
of t
he S
eaFU
ND
ACIO
N D
E LA
CO
MU
-N
IDAD
VAL
ENCI
ANA
PARA
LA
IN
VEST
IGAC
ION
, PR
O-
MO
CIO
N
Y ES
TUD
IOS
COM
ERCI
ALES
DE
VALE
N-
CIAP
ORT
EUSt
udy
11,3
94,9
705,
697,
485
50%
11,3
94,0
005,
697,
000
50%
2012
-EU
-210
21-S
Wid
erM
oSAu
torit
à Po
rtua
le
della
Sp
ezia
EUSt
udy
5,94
0,39
8.00
2,97
0,19
950
%5,
940,
000
2,97
0,00
050
%
2012
-EU
-210
23-S
Sust
aina
ble
Traffi
c M
achi
nes
- O
n th
e w
ay t
o gr
eene
r sh
ippi
ngSc
andl
ines
D
euts
chla
nd
Gm
bHEU
Stud
y25
,303
,950
.00
12,6
51,9
7550
%12
,917
,000
6,45
8,00
050
%
20 21
PPs
- Pr
iorit
y Pr
ojec
ts (N
ew A
ctio
ns)
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-AT-
1700
2-P
Prio
ritär
e TE
N-H
aupt
achs
e N
o.
17,
Öst
erre
ichi
sche
r Te
ilabs
chni
tt
“Mün
chen
–
Salz
burg
, Sa
lzbu
rg
– W
ien
und
Wie
n –
Brat
isla
va”;
Bau
der
Güt
erzu
gum
fahr
ung
St.
Pölte
n im
Wes
tabs
chni
tt (
shor
t tit
le: F
reig
ht
trai
n by
pass
St.
Pölte
n, c
onne
ctio
n to
th
e W
est)
Bund
esm
inis
teriu
m
für
Verk
ehr,
Inno
vatio
n un
d Te
chno
logi
e
ATW
ork
66,3
91,3
6013
,278
,272
20%
66,3
85,0
0013
,277
,000
20%
2012
-AT-
1700
3-P
Prio
ritär
e TE
N-H
aupt
achs
e N
o.
17,
Öst
erre
ichi
sche
r Te
ilabs
chni
tt
“Mün
chen
–
Salz
burg
, Sa
lzbu
rg
– W
ien
und
Wie
n –
Brat
isla
va”;
Lück
-en
schl
uss
St.
Pölte
n –
Loos
dorf
(G
üter
zugu
mfa
hrun
g),
Bau
des
Pum
mer
sdor
fer
Tunn
els
(sho
rt t
itle:
“P
umm
ersd
orfe
r Tu
nnel
”)
Bund
esm
inis
teriu
m
für
Verk
ehr,
Inno
vatio
n un
d Te
chno
logi
e
ATW
ork
66,9
82,0
0013
,396
,400
20%
66,9
75,0
0013
,395
,000
20%
2012
-AT-
1807
0-P
Expa
nsio
n of
th
e tr
i-m
odal
in
land
po
rt b
y la
nd r
ecov
ery
Wie
ner
Haf
en, G
mbh
& C
o KG
ATW
ork
12,7
97,4
772,
559,
495.
4020
%12
,790
,000
2,55
8,00
020
%
2012
-BE-
2810
5-P
Wat
erm
ael S
chum
an-J
osap
hat
Infr
abel
sa
BEW
ork
194,
471,
239.
1838
,894
,247
.84
20%
169,
720,
000
33,9
44,0
0020
%
2012
-CZ-
2211
7-P
INTE
RMO
DAL
TER
MIN
AL M
ELN
IKČe
ské
přís
tavy
, a.s
.CZ
Wor
k4,
134,
648
826,
929.
6020
%4,
130,
000
826,
000
20%
RIS
- Ri
ver
Info
rmat
ion
Serv
ices
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-BE-
7000
1-P
Impl
emen
tatio
n of
RIS
in F
land
ers
IVFl
emis
h G
over
nmen
tBE
Wor
k2,
940,
000
588,
000
20%
2,94
0,00
058
8,00
020
%
2012
-EU
-700
02-P
Impl
emen
tatio
n of
RIS
on
the
Wes
t-er
sche
ldt
Rive
r III
Flem
ish
Gov
ernm
ent
EUW
ork
2,37
5,00
047
5,00
020
%2,
375,
000
475,
000
20%
2012
-EU
-700
04-S
RIS
Enab
led
Euro
pean
IW
T Co
rrid
or
Man
agem
ent
Staa
t de
r N
eder
land
en,
Min
iste
rie
van
Infr
astr
uc-
tuur
en
Mili
eu
EUSt
udy
2,81
4,00
01,
407,
000
50%
2,81
4,00
01,
407,
000
50%
2012
-FR-
7000
3-S
RIS
Upp
er R
hine
Min
istè
re d
e l'é
colo
gie,
du
Dév
elop
pem
ent
dura
ble
et
de l'
éner
gie
FRSt
udy
1,93
6,20
096
8,10
050
%1,
936,
000
968,
000
50%
22 23
2012
-DE-
1702
2-S
Plan
ning
the
con
stru
ctio
n of
a n
ew
railw
ay c
onne
ctio
n be
twee
n M
unic
h Ai
rpor
t an
d th
e Eu
rope
an
railw
ay
corr
idor
TEN
PP
17 b
etw
een
Mun
ich
and
Salz
burg
Baye
risch
es
Staa
tsm
in-
iste
rium
fü
r W
irtsc
haft
, In
fras
truk
tur,
Verk
ehr
und
Tech
nolo
gie
DE
Stud
y25
,000
,000
12,5
00,0
0050
%25
,000
,000
12,5
00,0
0050
%
2012
-DE-
2001
2-S
Plan
ungs
leis
tung
en z
ur E
ntfle
chtu
ng
der
schi
enen
gebu
nden
en
Verk
ehre
bz
gl.
der
Fehm
arnb
elt-
Hin
terla
n-da
nbin
dung
an
dem
Ver
kehr
skno
ten
Ham
burg
(TEN
-V-A
chse
20)
Frei
e un
d H
anse
stad
t H
ambu
rg,
Behö
rde
für
Wirt
scha
ft, V
erke
hr u
nd In
-no
vatio
n
DE
Stud
y29
,200
,000
14,6
00,0
0050
%29
,200
,000
14,6
00,0
0050
%
2012
-DK-
2001
0-S
New
rai
lway
lin
e be
twee
n Co
penh
a-ge
n an
d Ri
ngst
ed (
deta
iled
plan
ning
ph
ase)
-acc
ess
lines
to
the
futu
re F
e-hm
arn
Belt
fixed
link
Bane
danm
ark
(Rai
l N
et
Den
mar
k)D
KSt
udy
61,1
68,0
0030
,584
,000
50%
61,1
68,0
0030
,584
,000
50%
2012
-DK-
2001
3-S
Upg
radi
ng t
he s
ectio
n fr
om R
ings
ted
to R
ødby
(se
cond
pha
se o
f de
taile
d pl
anni
ng
stud
ies)
-
upgr
adin
g th
e ra
ilway
acc
ess
lines
to th
e fu
ture
Fe-
hmar
n Be
lt fix
ed li
nk
Bane
danm
ark
(Rai
l N
et
Den
mar
k)D
KSt
udy
39,4
41,5
8619
,720
,793
50%
39,4
40,0
0019
,720
,000
50%
2012
-EE-
2700
1-S
Spat
ial P
lann
ing
and
Tech
nica
l Stu
d-ie
s fo
r Ra
il Ba
ltic
(Est
onia
n se
ctio
n)Es
toni
an T
echn
ical
Sur
veil-
lanc
e Au
thor
ityEE
Stud
y10
,257
,400
5,12
8,70
050
%10
,256
,000
5,12
8,00
050
%
2012
-EL-
2202
3-S
Υπολ
ειπό
μενε
ς με
λέτε
ς γι
α τη
ν υπ
ογει
οποι
ήση
και
ανισ
οπεδ
οποι
ήση
του
σιδη
ροδρ
ομικ
ού
διαδ
ρόμο
υ απ
ό τη
ν έξ
οδο
του
Σ.Σ
Πει
ραιά
(Χ.
Θ.
1+48
8)
έω
ς τη
ν εί
σοδο
το
υ Σ.
Σ Αθ
ηνώ
ν (X
.Θ. 9
+700
)
ΥΠΟ
ΥΡΓΕ
ΙΟ
ΑΝΑΠ
ΤΥΞΗ
Σ,
ΑΝ
ΤΑΓΩ
ΝΙΣ
ΤΙΚ
ΟΤΗ
ΤΑΣ,
ΥΠ
ΟΔΟ
ΜΩ
Ν,
ΜΕΤ
ΑΦΟ
ΡΩΝ
&
ΔΙΚ
ΤΥΩ
Ν
ELSt
udy
1,50
0,00
075
0,00
050
%1,
500,
000
750,
000
50%
2012
-ES-
0304
0-S
NU
EVO
ACC
ESO
SU
R VI
ARIO
Y F
ER-
ROVI
ARIO
AL
PUER
TO D
E BA
RCEL
O-
NA.
FAS
E 1.
EST
UD
IOS
Min
iste
rio
de
Fom
ento
. D
irecc
ión
Gen
eral
de
Fer-
roca
rrile
s.
ESSt
udy
1,58
0,40
079
0,20
050
%1,
580,
000
790,
000
50%
2012
-ES-
0811
3-P
Elec
tric
al
Faci
litie
s in
Se
ctio
n M
e-di
na d
el C
ampo
-Sal
aman
ca. R
ailw
ay
line
Med
ina
del
Cam
po-S
alam
anca
-Fu
ente
s de
Oño
rio
ADM
INIS
TRAD
OR
DE
IN-
FRAE
STRU
CTU
RAS
FERR
O-
VIAR
IAS
ESW
ork
28,3
70,0
005,
674,
000
20%
28,3
70,0
005,
674,
000
20%
2012
-ES-
1609
6-P
Trac
k be
d w
orks
, Si
gnal
ing
and
Tel-
ecom
unic
atio
n Fa
cilit
ies.
Sec
tion
Pk
3,1
a P
k 6,
8. S
an R
oque
Mer
canc
ías.
Ra
ilway
Lin
e Bo
badi
lla-A
lgec
iras
ADM
INIS
TRAD
OR
DE
IN-
FRAE
STRU
CTU
RAS
FERR
O-
VIAR
IAS
ESW
ork
14,0
00,0
002,
800,
000
20%
14,0
00,0
002,
800,
000
20%
2012
-ES-
1903
1-S
IMPL
ANTA
CIÓ
N D
EL A
NCH
O U
IC E
N
EL C
ORR
EDO
R M
EDIT
ERRÁ
NEO
. FAS
E 1.
EST
UD
IOS.
Min
iste
rio
de
Fom
ento
. D
irecc
ión
Gen
eral
de
Fer-
roca
rrile
s.
ESSt
udy
9,75
4,90
04,
877,
450
50%
9,75
4,00
04,
877,
000
50%
2012
-ES-
1904
1-P
IMPL
ANTA
CIÓ
N
DEL
AN
CHO
U
IC
EN
EL
CORR
EDO
R M
EDIT
ERRÁ
NEO
. TR
AMO
: CA
STEL
LBIS
BAL-
NU
DO
DE
VILA
SECA
. FAS
E 1.
ADM
INIS
TRAD
OR
DE
IN-
FRAE
STRU
CTU
RAS
FERR
O-
VIAR
IAS
ESW
ork
340,
859,
700
68,1
71,9
4020
%34
0,85
5,00
068
,171
,000
20%
22 23
2012
-EU
-010
92-S
Prio
rity
TEN
-axi
s N
o. 1
, Glo
bal P
roje
ct
“Mun
ich–
Kufs
tein
, Ku
fste
in–I
nns-
bruc
k, B
renn
er B
ase
Tunn
el (
cros
s-bo
rder
) an
d Fo
rtez
za–V
eron
a”;
Pre-
stud
y fo
r th
e N
orth
ern
Acce
ss L
ine
to t
he B
renn
er B
ase
Tunn
el b
etw
een
Mun
ich
(Ger
man
y) a
nd R
adfe
ld (A
us-
tria
)
Bund
esm
inis
teriu
m
für
Verk
ehr,
Inno
vatio
n un
d Te
chno
logi
e
EUSt
udy
6,71
5,00
03,
357,
500
50%
6,71
4,00
03,
357,
000
50%
2012
-EU
-010
98-S
PRIO
RITY
PRO
JECT
TEN
NO
. 1 B
REN
-N
ER B
ASE
TUN
NEL
- S
TUD
IES
MIN
ISTE
RO
DEL
LE
IN-
FRAS
TRU
TTU
RE
E D
EI
TRAS
PORT
I
EUSt
udy
171,
300,
000
85,6
50,0
0050
%17
1,30
0,00
085
,650
,000
50%
2012
-EU
-130
66-S
Acce
lera
ting
the
intr
oduc
tion
of E
lec-
tric
Veh
icle
Rap
id C
harg
ing
by s
tudy
-in
g ad
optio
n an
d us
e al
ong
PP a
xes
13 a
nd 2
6 in
the
UK
and
Irela
nd
Nis
san
Mot
or (G
B) L
tdEU
Stud
y7,
359,
778
3,67
9,88
850
%7,
358,
000.
003,
679,
000
50%
2012
-EU
-180
67-S
LNG
M
aste
rpla
n fo
r Rh
ine-
Mai
n-D
anub
ePr
o D
anub
e M
anag
emen
t G
mbH
EUSt
udy
121,
316,
983.
4460
,658
,491
.72
50%
80,5
20,0
0040
,260
,000
50%
2012
-EU
-180
89-S
Hig
h-pe
rfor
man
ce
GRE
EN
PORT
G
IURG
IUIL
R Lo
gist
ica
Rom
ania
S.
R.L.
EUSt
udy
16,8
72,5
008,
436,
250
50%
800,
000
400,
000
50%
2012
-FR-
0305
4-S
Gra
nd P
roje
t du
Sud
Oue
st -
Bor
-de
aux
Espa
gne
Min
istè
re d
e l'é
colo
gie,
du
déve
lopp
emen
t du
rabl
e, e
t de
l’én
ergi
e
FRSt
udy
11,3
00,0
005,
650,
000
50%
11,3
00,0
005,
650,
000
50%
2012
-FR-
2405
3-S
Prem
ière
éta
pe d
e dé
satu
ratio
n du
N
oeud
fer
rovi
aire
de
Lyon
Min
istè
re d
e l'é
colo
gie,
du
déve
lopp
emen
t du
rabl
e, e
t de
l’én
ergi
e
FRSt
udy
19,3
00,0
009,
650,
000
50%
19,3
00,0
009,
650,
000
50%
2012
-IE-
2604
3-S
City
Ce
ntre
Re
-sig
nalli
ng
Proj
ect
- Co
nnol
ly S
tatio
n to
San
dym
ount
Sta
-tio
n -
Des
ign
Stag
e
Dep
artm
ent
of
Tran
spor
t, To
uris
m a
nd S
port
IESt
udy
1,44
9,00
072
4,50
050
%1,
448,
000
724,
000
50%
2012
-IT-
0607
2-P
Trat
ta A
V/AC
Tre
vigl
io -
Bre
scia
: com
-pl
etam
ento
1°
lott
o co
stru
ttiv
o tr
atta
e
real
izza
zion
e op
ere
di s
iste
maz
ione
st
azio
ne d
i Bre
scia
.
Min
iste
ro d
elle
Inf
rast
rut-
ture
e d
ei T
rasp
orti
ITW
ork
729,
051,
796
145,
810,
359
20%
657,
650,
000
131,
530,
000
20%
2012
-IT-
2407
1-P
MXP
T2(R
ailin
k)-U
PRa
ilink
S.r.
l.IT
Wor
k11
5,00
0,00
023
,000
,000
20%
115,
000,
000
23,0
00,0
0020
%
2012
-IT-
2411
6-P
CIM
WES
T TE
RMIN
AL E
XPAN
SIO
NC.
I.M. S
.p.A
.IT
Wor
k10
,000
,000
2,00
0,00
020
%10
,000
,000
2,00
0,00
020
%
2012
-LU
-280
25-S
Luxe
mbo
urg
rail
netw
ork.
Eur
oCap
-Ra
il. S
tudi
es r
egar
ding
the
con
stru
c-tio
n of
a n
ew s
ectio
n pr
ovid
ing
a di
rect
link
bet
wee
n Lu
xem
bour
g St
a-tio
n an
d Be
ttem
bour
g an
d th
e up
-gr
adin
g of
Bet
tem
bour
g St
atio
n.
Min
istè
re
du
Dév
elop
pe-
men
t du
rabl
e et
des
Infr
a-st
ruct
ures
LUSt
udy
9,62
5,82
54,
812,
911
50%
9,62
4,00
04,
812,
000
50%
2012
-LV-
2712
0-S
Prel
imin
ary
desi
gn
and
oper
atio
ns
stud
ies
for
Rail
Balti
ca r
ailw
ay l
ine
Latv
ian
sect
ion
Min
istr
y of
Tra
nspo
rt o
f the
Re
publ
ic o
f La
tvia
LVSt
udy
9,84
0,00
04,
920,
000
50%
9,84
0,00
04,
920,
000
50%
2012
-SE-
1203
3-S
Des
ign
stud
ies
for
expa
nsio
n to
fou
r tr
acks
of
Nor
dic
Tria
ngle
at F
lack
arp-
Arlö
v in
Sw
eden
Swed
ish
Tran
spor
t Ad
min
-is
trat
ion
SESt
udy
19,0
86,6
789,
543,
339
50%
19,0
86,0
009,
543,
000
50%
24 25
2012
-SE-
1204
8-P
Com
plet
ion
of
the
railw
ay
tun-
nel
thro
ugh
Hal
land
sås
– a
prio
rity
proj
ect
in t
he N
ordi
c Tr
iang
le
Swed
ish
Tran
spor
t Ad
min
-is
trat
ion
SEW
ork
396,
808,
200
79,3
61,6
4020
%39
6,80
8,00
079
,361
,000
20%
2012
-SE-
1206
9-P
The
Got
henb
urg
Port
Lin
e -
railw
ay
brid
ge a
t M
arie
holm
Swed
ish
Tran
spor
t Ad
min
-is
trat
ion
SEW
ork
120,
447,
648
24,0
89,5
3020
%12
0,44
5,00
024
,089
,000
20%
2012
-SI-
0608
3-S
Izde
lava
pro
jekt
a za
prid
obite
v gr
ad-
bene
ga d
ovol
jenj
a (P
GD
) in
pro
jekt
a za
izve
dbo
(PZI
) za
ure
dite
v vo
zliš
ča
z ur
editv
ijo ž
elez
nišk
e po
staj
e Pr
ag-
ersk
o
Min
istr
stvo
za
in
fras
truk
-tu
ro
in
pros
tor
Repu
blik
e Sl
oven
ije
SISt
udy
4,28
0,00
02,
140,
000
50%
4,28
0,00
02,
140,
000
50%
2012
-SI-
0608
6-S
Exec
utio
n de
sign
for
upg
radi
ng t
he
exis
ting
mai
n do
uble
-tra
ck e
lect
rified
Zi
dani
Mos
t-Ce
lje r
ailw
ay li
ne
Min
istr
y of
In
fras
truc
ture
an
d Sp
atia
l Pla
nnin
gSI
Stud
y3,
500,
000
1,75
0,00
050
%3,
500,
000
1,75
0,00
050
%
2012
-UK-
1301
8-P
A8 B
elfa
st t
o La
rne
Dua
lling
(Fr
om
Cole
man
’s
Corn
er
to
Bally
ricka
rd
Road
)
Dep
artm
ent
for
Tran
spor
tU
KW
ork
112,
520,
387.
7622
,504
,077
.56
20%
91,8
60,0
0018
,372
,000
20%
2012
-UK-
2603
0-P
Felix
stow
e ra
il te
rmin
al (
phas
e 2)
-
Furh
er
impr
ovin
g in
emod
al
tras
fer
and
rem
ovin
g bo
ttle
neck
on
PP26
Dep
artm
ent
for
Tran
spor
tU
KW
ork
13,2
27,0
002,
645,
400
20%
8,62
0,00
01,
724,
000
20%
2012
-UK-
2605
8-P
Com
plet
ing
PP26
Sou
th (
Felix
stow
e to
Nun
eato
n) a
nd D
eliv
erin
g th
e TE
N-
T Co
re R
ail
Net
wor
k in
the
Uni
ted
King
dom
: Ips
wic
h Ch
ord
Dep
artm
ent
for
Tran
spor
tU
KW
ork
62,0
78,5
83.4
112
,415
,716
.68
20%
62,0
75,0
0012
,415
,000
20%
2012
-UK-
2606
0-P
Com
plet
ing
Prio
rity
Axis
26
(PP
26)
Nor
th a
nd d
eliv
erin
g th
e TE
N-T
Cor
e Ra
il N
etw
ork
in t
he U
nite
d Ki
ngdo
m:
Tran
spen
nine
Rai
l Ele
ctrifi
catio
n
Dep
artm
ent
for
Tran
spor
tU
KW
ork
155,
159,
806.
7131
,031
,961
.34
20%
155,
155,
000
31,0
31,0
0020
%
2012
-UK-
2606
1-S
Stud
y to
test
the
pote
ntia
l of B
io-L
NG
to
con
trib
ute
to E
urop
ean
rene
wab
le
ener
gy t
arge
ts b
ased
on
a pi
lot
re-
fuel
ling
and
stor
age
netw
ork
tria
lled
with
HG
V fle
et o
pera
tors
in t
he U
K.
Gas
rec
Ltd
UK
Stud
y16
,411
,000
5,77
4,00
035
.18%
16,4
08,5
725,
743,
000
35%
PPs
- Pr
iorit
y Pr
ojec
ts (O
ngoi
ng A
ctio
ns)
Prop
osal
Num
ber
Titl
e(C
oord
inat
ing)
Ap
plic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
fu
ndin
gRe
com
men
ded
tota
l elig
ible
co
sts
€
Reco
mm
ende
d TE
N-T
fu
ndin
g €
% T
EN-T
fu
ndin
g
2012
-DE-
0405
7-P
POS
Nor
dBu
ndes
min
iste
rium
fü
r Ve
rkeh
r, Ba
u un
d St
adte
n-tw
ickl
ung
DE
Wor
k74
,200
,114
9,91
3,13
513
.36%
73,7
50,4
13.7
09,
882,
556
13.4
0%
2012
-DE-
1704
6-P
Neu
baus
trec
ke W
endl
inge
n -
Ulm
Bund
esm
inis
teriu
m
für
Verk
ehr,
Bau
und
Stad
ten-
twic
klun
g
DE
Wor
k62
5,74
1,44
935
,354
,392
5.65
%53
7,89
5,74
830
,383
,615
5.65
%
24 25
2012
-DE-
1705
0-P
Aus-
und
Neu
baus
trec
ke S
tutt
gart
-
Wen
dlin
gen
eins
chlie
ßlic
h St
uttg
art
21
Bund
esm
inis
teriu
m
für
Verk
ehr,
Bau
und
Stad
ten-
twic
klun
g
DE
Wor
k75
6,68
8,12
963
,507
,480
8.39
%75
6,68
8,12
920
,616
,775
2.73
%
2012
-DE-
2403
7-P
Ausb
aust
reck
e/N
euba
ustr
ecke
Ka
rl-sr
uhe
Base
l m
it te
ilwei
sen
Ausb
au-
maß
nahm
en
an
der
best
ehen
den
Stre
cke
Bund
esm
inis
teriu
m
für
Verk
ehr,
Bau
und
Stad
ten-
twic
klun
g
DE
Wor
k33
8,91
3,00
034
,874
,148
10.2
9%32
7,71
4,56
533
,721
,829
10.2
9%
2012
-ES-
0309
3-P
Cons
truc
ción
de
la N
ueva
Red
Fer
ro-
viar
ia e
n el
Pai
s Va
sco
( Y fe
rrov
iaria
) . T
ram
o gu
ipuz
coan
o
Gob
iern
o Va
sco.
Dep
arta
-m
ento
de
Med
io A
mbi
ente
y
Polit
ica
Terr
itoria
l
ESW
ork
1,08
7,89
9,22
332
6,36
9,76
730
%39
,556
,579
5,93
3,48
715
%
2012
-EU
-010
99-P
PRIO
RITY
PRO
JECT
TEN
NO
. 1 B
REN
-N
ER B
ASE
TUN
NEL
- W
ORK
SM
INIS
TERO
D
ELLE
IN
-FR
ASTR
UTT
URE
E
DEI
TR
ASPO
RTI
EUW
ork
558,
900,
000
167,
670,
000
30%
558,
900,
000
16,7
67,0
003%
2012
-EU
-031
15-P
Wor
ks f
or t
he H
igh-
Spee
d Ra
ilway
Ax
is o
f So
uth-
Wes
t Eu
rope
(PP
3) -
Li
sbon
-Mad
rid
Axis
: Cr
oss-
Bord
er
Sect
ion
Évor
a-M
érid
a
DIR
ECCI
ÓN
G
ENER
AL
DE
FERR
OCA
RRIL
ESEU
Wor
k17
4,62
5,85
652
,387
,757
30%
174,
625,
856
8,73
1,29
35%
2012
-EU
-060
49-P
Dem
ande
de
fin
ance
men
t su
pplé
-m
enta
ire 2
012-
2015
pou
r le
s ac
qui-
sitio
ns f
onci
ères
de
la s
ectio
n tr
ans-
fron
taliè
re d
u Ly
on-T
urin
Min
istè
re d
e l'E
colo
gie,
du
Dév
elop
pem
ent
Dur
able
et
de l'
Ener
gie
EUW
ork
684,
316,
207
300,
032,
600
43.8
4%18
9,69
7,50
95,
690,
925
3%
2012
-EU
-200
24-P
Fehm
arnb
elt
fixed
rai
l/roa
d lin
kM
inis
try
of T
rans
port
EUW
ork
289,
253,
100
106,
534,
550
36.8
3%19
0,46
0,00
011
,637
,106
6.11
%
2012
-EU
-300
81-P
Appl
icat
ion
mod
ifian
t la
dé
cisi
on
C(20
08)8
141
du 1
5 dé
cem
bre
2008
co
ncer
nant
l'oc
troi
d'u
n co
ncou
rs fi
n-an
cier
en
fave
ur d
e pr
ojet
s d'
inté
rêt
com
mun
«Li
aiso
n flu
vial
e Se
ine-
Es-
caut
– t
ronç
on t
rans
fron
talie
r en
tre
Com
pièg
ne
et
Gan
d»
- 20
07-E
U-
3001
0-P
Min
istè
re d
e l'é
colo
gie,
du
déve
lopp
emen
t du
rabl
e et
de
l'én
ergi
e
EUW
ork
1,01
6,15
1,00
135
4,73
5,00
034
.91%
37,3
00,0
0011
,190
,000
30%
2012
-FI-
1208
7-P
Airp
ort
railw
ay li
ne (R
ING
-lin
e)Th
e M
inis
try
of T
rans
port
an
d Co
mm
unic
atio
nsFI
Wor
k29
0,42
6,10
158
,085
,220
20%
178,
585,
651
26,7
87,8
4715
%
2012
-FR-
0305
6-P
Cont
ourn
emen
t N
imes
Mon
tpel
lier
Min
istè
re d
e l'é
colo
gie,
du
déve
lopp
emen
t du
rabl
e, e
t de
l’én
ergi
e
FRW
ork
1,13
3,89
6,58
922
6,77
9,31
720
%69
6,53
2,73
710
4,47
9,91
015
%
2012
-FR-
0305
9-P
Dés
atur
atio
n du
noe
ud f
erro
viai
re d
e Bo
rdea
uxM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppem
ent
dura
ble,
et
de l’
éner
gie
FRW
ork
147,
324,
509
29,4
64,9
0220
%14
7,32
4,50
922
,098
,676
15%
2012
-IT-
0107
9-P
Line
a di
acc
esso
mer
idio
nale
al B
ren-
nero
Min
iste
ro d
elle
Inf
rast
rut-
ture
e d
ei T
rasp
orti
ITW
ork
36,8
90,3
407,
378,
068
20%
36,8
90,3
405,
533,
551
15%
26 27
6. P
ropo
sals
NO
T re
com
men
ded
unde
r th
e 20
12 T
EN-T
Mul
ti-A
nnua
l Cal
l for
Pro
posa
ls
ATM
- A
ir Tr
affic
Man
agem
ent
Prop
osal
N
umbe
r Ti
tle
(Coo
rdin
atin
g) A
pplic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
re
ques
ted
fund
ing
Exte
rnal
Eva
luat
ion
Reco
mm
enda
tion
2012
-BE-
4001
0-S
Set-
up o
f Ce
ntra
lised
Ser
vice
s to
con
trib
ute
to S
ES
Perf
orm
ance
Ach
ieve
men
t.EU
ROPE
AN
ORG
ANIS
ATIO
N
FOR
THE
SAFE
TY
OF
AIR
NAV
IGAT
ION
(E
URO
-CO
NTR
OL)
BESt
udy
56,8
05,9
4928
,402
,974
.50
50%
No
2012
-EU
-400
07-P
Impl
emen
tatio
n of
Har
mon
ized
Fun
ctio
nalit
y fo
r CO
O-
PAN
S Bu
ild 2
.5LF
VEU
Wor
k7,
072,
778
1,41
4,55
620
%N
o
2012
-EU
-400
08-S
COO
PAN
S O
pera
tiona
l Har
mon
izat
ion
Stud
yLF
VEU
Stud
y3,
768,
934
1,88
4,46
750
%N
o
2012
-EU
-400
13-S
FAB
Cent
ral E
urop
e: P
ilot
Seam
less
Ope
ratio
nAU
STRO
CO
NTR
OL
ÖST
ERRE
ICH
ISCH
E G
ESEL
LSCH
AFT
FÜR
ZIVI
LLU
FTFA
HRT
EUSt
udy
26,0
96,0
5813
,048
,029
50%
No
2012
-HU
-400
11-P
MAT
IAS
Build
10,
dev
elop
men
t of
MAT
IAS
air
traffi
c co
ntro
l sys
tem
Hun
garo
Cont
rol H
unga
rian
Air
Nav
iga-
tion
Serv
ices
Priv
ate
Lim
ited
Com
pany
HU
Wor
k13
,169
,350
2,63
3,87
020
%N
o
2012
-HU
-400
12-P
rTW
R -
Dev
elop
men
t of
rem
ote
(virt
ual)
tow
erH
unga
roCo
ntro
l Hun
garia
n Ai
r N
avig
a-tio
n Se
rvic
es P
rivat
e Li
mite
d Co
mpa
nyH
UW
ork
7,79
6,31
21,
299,
386
16.6
7%N
o
Prop
osal
N
umbe
r Ti
tle
(Coo
rdin
atin
g) A
pplic
ant
MS
Stud
y/W
orks
/Mix
Tota
l elig
ible
co
sts
€TE
N-T
re
ques
ted
fund
ing
€
% T
EN-T
re
ques
ted
fund
ing
Exte
rnal
Eva
luat
ion
Reco
mm
enda
tion
2012
-AT-
6000
1-P
ETCS
onb
oard
equ
ipm
ent
of T
X Lo
gist
ik A
ustr
ia A
G
loco
mot
ives
to
oper
ate
on E
RTM
S Co
rrid
or B
(E
TCS-
TXLA
)
TX L
ogis
tik A
ustr
ia G
mbH
ATW
ork
2,91
5,75
01,
457,
875
50%
No
2012
-BE-
6002
4-P
ETCS
inst
alle
d on
the
pilo
t co
ache
s ty
pe I1
1 an
d ty
pe
M6
NM
BS/S
NCB
(N
V va
n pu
blie
k re
cht/S
A de
dro
it pu
blic
)BE
Wor
k17
,367
,000
5,83
3,50
033
.59%
No
2012
-DE-
6001
0-P
Equi
pmen
t of
86
frei
ght
loco
mot
ives
with
ETC
S on
-bo
ard-
units
acc
ordi
ng t
o SR
S 2.
3.0d
/ Ba
selin
e 3
Railp
ool G
mbH
DE
Wor
k12
,650
,000
6,32
5,00
050
%Ye
s
2012
-DK-
6000
3-P
Impl
emen
tatio
n of
ERT
MS
Base
line
3 on
pas
seng
er
rolli
ng s
tock
in D
enm
ark
- Fi
rst
of c
lass
Bane
danm
ark
(Rai
l Net
Den
mar
k)D
KW
ork
78,1
93,3
1839
,096
,659
50%
No
2012
-DK-
6002
6-P
Upg
rade
or
equi
pmen
t of
tra
ins
with
bas
elin
e 3
Cont
ec R
ail A
psD
KW
ork
1,11
4,47
255
7,23
650
%N
o
2012
-EU
-600
04-P
Prot
otyp
ing,
te
stin
g,
cert
ifyin
g an
d re
trofi
ttin
g of
TR
AXX
loco
mot
ives
to
ETCS
2.3
.0d
/ Bas
elin
e 3
Mac
quar
ie E
urop
ean
Rail
Lim
ited
(Lux
-em
bour
g Br
anch
)EU
Wor
k37
,465
,056
6,45
0,00
017
.22%
No
2012
-EU
-600
32-S
Faci
litat
ing
and
Spee
ding
up
ERTM
S In
tero
pera
bilit
yM
ultit
elEU
Stud
y10
,668
,816
5,33
4,40
850
%N
o
2012
-FR-
6001
7-S
Form
alis
atio
n of
the
ERT
MS
stan
dard
s fo
r th
e H
SL
equi
pped
with
TVM
Min
istè
re d
e l'é
colo
gie,
du
déve
lopp
e-m
ent
dura
ble,
et
de l’
éner
gie
FRSt
udy
4,01
3,75
6.33
2,00
6,87
8.16
50%
No
2012
-IT-
6002
1-P
ERTM
S D
ATA
LOG
AN
ALYZ
ERM
INIS
TERO
DEL
LE I
NFR
ASTR
UTT
URE
E
DEI
TRA
SPO
RTI
ITW
ork
6,00
0,00
03,
000,
000
50%
No
ERTM
S -
Euro
pean
Rai
l Tra
ffic
Man
agem
ent
Syst
em
26 27
ITS/
EETS
- In
telli
gent
Tra
nspo
rt S
yste
ms/
Euro
pean
Ele
ctro
nic
Toll
Serv
ice
Prop
osal
N
umbe
r Ti
tle
(Coo
rdin
atin
g)
Appl
ican
tM
SSt
udy/
Wor
ks/M
ixTo
tal e
ligib
le
cost
s €
TEN
-T
requ
este
d fu
ndin
g €
% T
EN-T
re
ques
ted
fu
ndin
g
Exte
rnal
Eva
luat
ion
Reco
mm
enda
tion
2012
-ES-
5001
1-S
STM
- S
mar
t Tr
affic
Man
agem
ent
Asoc
iaci
ón E
spañ
ola
de l
a Ca
rret
era
(AEC
)ES
Stud
y1,
883,
200
941,
600
50%
No
2012
-EU
-500
01-P
NEX
T-IT
S –
ITS
on t
he E
xten
ded
Nor
dic
Tria
ngle
Swed
en.
Min
istr
y of
Ent
erpr
ise,
Ene
rgy
and
Com
mun
icat
ions
/ Sw
edis
h Tr
ans-
port
Adm
inis
trat
ion
EUW
ork
134,
427,
000
26,8
85,4
0020
%N
o
2012
-EU
-500
02-S
Geo
Toll
Pay
DG
AE -
Dire
ção-
Ger
al d
as A
tivid
ades
Ec
onóm
icas
(M
inis
tério
da
Econ
omia
e
do E
mpr
ego)
EUSt
udy
325,
344
162,
672
50%
No
2012
-EU
-500
03-P
CITI
ES+
DIR
ECCI
ÓN
GEN
ERAL
DE
TRÁF
ICO
EUW
ork
58,2
50,5
0011
,650
,100
20%
No
2012
-EU
-500
04-P
Arc
Atla
ntiq
ue T
raffi
c M
anag
emen
t Co
rrid
orD
epar
tmen
t fo
r Tr
ansp
ort
EUW
ork
190,
229,
433.
7738
,045
,886
.75
20%
No
2012
-EU
-500
06-P
CRO
COD
ILE
Bund
esm
inis
terim
für
Ver
kehr
, Inn
ova-
tion
und
Tech
nolo
gie
EUW
ork
148,
772,
500
29,7
54,5
0020
%N
o
2012
-EU
-500
07-P
MAG
NA
GRA
ECIA
Min
istr
y of
D
evel
opm
ent,
Com
peti-
tiven
ess,
Inf
rast
ruct
ure,
Tra
nspo
rt a
nd
Net
wor
ks (
Gen
eral
Sec
reta
ry o
f Pu
blic
W
orks
)
EUW
ork
7,93
0,00
01,
586,
000
20%
No
2012
-EU
-500
08-P
Med
TIS
Asso
ciat
ion
des
soci
étés
fr
ança
ises
d'
auto
rout
es (A
SFA)
EUW
ork
164,
150,
500
32,8
30,1
0020
%N
o
2012
-EU
-500
10-P
Cham
eleo
nBu
ndes
min
iste
rium
fü
r Ve
rkeh
r, Ba
u un
d St
adte
ntw
ickl
ung
EUW
ork
183,
098,
508
36,6
19,7
0220
%N
o
2012
-EU
-500
12-P
Corr
idor
du
Sole
ilM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppe-
men
t-du
rabl
e et
de
l'éne
rgie
(MED
DE)
EUW
ork
97,8
54,0
0019
,570
,800
20%
No
2012
-IT-
6002
9-P
ATTR
EZZA
GG
IO D
ELLE
LIN
EE F
ERRO
VIAR
IE E
DEL
MA-
TERI
ALE
ROTA
BILE
DI R
FT E
TFT
CO
N E
RTM
S/ET
CS L
2 E
GSM
-R (S
ST E
SSB
)
RETE
FER
ROVI
ARIA
TO
SCAN
A S.
p.A.
ITW
ork
21,2
55,5
49.9
910
,627
,774
.99
50%
No
2012
-NL-
6000
7-P
Retr
o Fi
ttin
g&U
p gr
adin
g D
iese
l Ve
hicl
es; D
evel
opin
g O
n Bo
ard
Uni
t So
ftw
are
and
Spec
ific
Vehi
cle
Impl
e-m
enta
tion
Des
igns
, Pr
otot
ypin
g,
Test
ing,
Ce
rtify
ing
and
Inst
alla
tion
wor
ks.
DB
Sche
nker
Rai
l Ned
erla
nd N
VN
LW
ork
16,6
14,0
007,
087,
000
42.6
6%N
o
2012
-PL-
6003
1-P
Wdr
ożen
ie s
yste
mu
ERTM
S/ET
CS p
ozio
m 1
na
lini
ach
kole
jow
ych
570
i 64
na o
dcin
ku P
sary
– K
ozłó
wPK
P Po
lski
e Li
nie
Kole
jow
e S.
A.PL
Wor
k2,
312,
370
1,15
6,18
550
%N
o
2012
-SK-
6003
0-S
ERTM
S de
ploy
men
t on
Slo
vak
part
of
the
Corr
idor
E:
stat
e bo
rder
CZ/
SK –
Kút
y –
Junc
tion
Brat
isla
va –
Rus
-ov
ce –
sta
te b
orde
r SK
/HU
Min
istr
y of
Tra
nspo
rt, C
onst
ruct
ion
and
Regi
onal
Dev
elop
men
t of
the
Slo
vak
Repu
blic
SKSt
udy
3,49
2,20
01,
746,
100
50%
No
28 29
MoS
- M
otor
way
s of
the
Sea
PPs
- Pr
iorit
y Pr
ojec
ts (N
ew A
ctio
ns)
Prop
osal
N
umbe
r Ti
tle
(Coo
rdin
atin
g)
Appl
ican
tM
SSt
udy/
Wor
ks/M
ixTo
tal e
ligib
le
cost
s €
TEN
-T
requ
este
d fu
ndin
g €
% T
EN-T
re
ques
ted
fu
ndin
g
Exte
rnal
Eva
luat
ion
Reco
mm
enda
tion
2012
-EU
-210
04-P
Forc
ing
a br
eakt
hrou
gh f
or u
se o
f LN
G in
Mar
itim
e sh
ippi
ngAn
thon
y Ve
der
Rede
rijza
ken
B.V.
EUW
ork
12,3
89,9
583,
746,
947
30.2
4%N
o
2012
-EU
-210
05-S
Tow
ards
Rou
nd-t
he-Y
ear
Win
ter
Nav
igat
ion
with
out
Icer
eaki
ng A
ssis
tanc
e (T
RYN
ICE)
VTT
Tech
nica
l Re
sear
ch C
entr
e of
Fin
-la
ndEU
Stud
y1,
163,
090
581,
545
50%
No
2012
-EU
-210
12-S
LNG
in B
altic
and
Bla
ck S
ea P
orts
Trel
lebo
rgs
Ham
n AB
EUSt
udy
1,15
6,53
9.58
485,
941
42.0
2%N
o
2012
-EU
-210
14-P
ATLA
NTI
CA O
PTIM
oSTe
rmin
als
Org
anis
mo
Públ
ico
Puer
tos
del E
stad
oEU
Wor
k18
,408
,028
3,68
1,60
620
%N
o
2012
-EU
-210
15-S
MAG
ELLA
NO
202
0 –
GRE
EN I
NCE
NTI
VES
FOR
MO
S BA
SED
CO
RRID
ORS
Rete
Aut
ostr
ade
Med
iterr
anee
Spa
EUSt
udy
3,54
7,01
21,
773,
506
50%
No
2012
-EU
-210
16-P
Impr
ovem
ent o
f m
ulti-
mod
al tr
ansp
ort a
nd s
ea-b
ased
lin
k Sw
inou
jsci
e-Tr
elle
borg
Trel
lebo
rgs
Ham
n AB
EUW
ork
22,9
96,7
424,
543,
670
19.7
6%N
o
2012
-EU
-210
18-S
Trai
nMoS
2U
NIV
ERSI
TY O
F ST
RATH
CLYD
EEU
Stud
y2,
548,
696
1,27
4,34
850
%N
o
2012
-EU
-210
22-P
Both
niaL
NG
The
Balti
c In
stitu
te o
f Fi
nlan
dEU
Wor
k51
,124
,600
15,1
03,0
5029
.54%
No
2012
-EU
-210
24-S
“SEA
PLAN
ES-S
EE”:
Seap
lane
s “D
ossi
er &
Ten
der”
for
So
uth
East
Eur
ope
Ope
ratio
nsEP
SILO
N IN
TERN
ATIO
NAL
SA
EUSt
udy
1,66
0,00
083
0,00
050
%N
o
Prop
osal
N
umbe
r Ti
tle
(Coo
rdin
atin
g)
Appl
ican
tM
SSt
udy/
Wor
ks/M
ixTo
tal e
ligib
le
cost
s €
TEN
-T
requ
este
d fu
ndin
g €
% T
EN-T
re
ques
ted
fu
ndin
g
Exte
rnal
Eva
luat
ion
Reco
mm
enda
tion
2012
-AT-
1703
4-P
Prio
rity
TEN
-axi
s N
o. 1
7, A
ustr
ian
part
in s
ub-s
ectio
n "M
unic
h–Sa
lzbu
rg, S
alzb
urg–
Vien
na, V
ienn
a–Br
atis
la-
va”;
Gap
-clo
sure
bet
wee
n H
uber
tend
orf
and
Blin
den-
mar
kt (v
ia B
urgs
talle
rtun
nel)
to e
nabl
e th
e re
quire
d fo
ur-t
rack
ope
ratio
n fo
r "Y
bbs
– Am
stet
ten"
Bund
esm
inis
teriu
m f
ür V
erke
hr,
Inno
-va
tion
und
Tech
nolo
gie
ATW
ork
67,8
48,9
31.3
413
,569
,786
.27
20%
Yes
2012
-AT-
1710
0-S
Prio
rity
TEN
-axi
s N
o. 1
7, in
sub
-sec
tion
“Mun
ich–
Salz
-bu
rg,
Salz
burg
–Vie
nna,
Vi
enna
–Bra
tisla
va”;
“Des
ign
stud
y le
adin
g to
and
Env
ironm
enta
l Im
pact
Ass
ess-
men
t ne
cess
ary
for
the
impl
emen
tatio
n of
the
gap
-cl
osur
e Sa
lzbu
rg –
Ste
indo
rf/S
traß
wal
chen
”
Bund
esm
inis
teriu
m f
ür V
erke
hr,
Inno
-va
tion
und
Tech
nolo
gie
ATSt
udy
8,58
1,40
04,
290,
700
50%
Yes
2012
-AT-
1710
6-P
Prio
rity
TEN
-axi
s N
o. 1
7 in
sub
-sec
tion
“Mun
ich
– Sa
lz-
burg
(cr
oss-
bord
er),
Salz
burg
– V
ienn
a, a
nd V
ienn
a –
Brat
isla
va”;
Inte
grat
ion
of t
he t
hree
tra
cks
from
“Fr
ei-
lass
ing
– Sa
lzbu
rg”
into
Sal
zbur
g M
ain
Trai
n St
atio
n (“
wor
ks”)
Bund
esm
inis
teriu
m f
ür V
erke
hr,
Inno
-va
tion
und
Tech
nolo
gie
ATW
ork
108,
915,
300
21,7
83,0
6020
%Ye
s
28 29
2012
-AT-
1710
8-P
PP17
sub
-sec
tion
“Mun
ich–
Salz
burg
, Sal
zbur
g–Vi
enna
, Vi
enna
– Br
atis
lava
”; co
nnec
tion
Vien
na –
Slo
vaki
an
bord
er n
ear
Mar
cheg
g; e
lect
rifica
tion
and
two-
trac
k up
grad
ing
Wie
n-St
adla
u –
Wie
n-As
pern
(sh
ort
title
: “u
pgra
ding
Wie
n-St
adla
u –
Wie
n-As
pern
”)
Bund
esm
inis
teriu
m f
ür V
erke
hr,
Inno
-va
tion
und
Tech
nolo
gie
ATW
ork
25,2
52,0
005,
050,
400
20%
No
2012
-BE-
2410
3-P
Wor
ks fo
r Rai
l Fre
ight
Cor
ridor
8 o
n th
e Be
lgia
n te
rrito
-ry
: ele
ctrifi
catio
n w
orks
Her
enta
ls-M
ol, t
rans
form
atio
n tr
ack
confi
gura
tion
Nee
rpel
t, re
-ope
ning
the
tra
in s
top
at H
amon
t, up
grad
ing
exis
ting
sign
allin
g te
chno
logy
.
Infr
abel
sa
BEW
ork
40,2
20,0
27.2
68,
044,
005.
4620
%Ye
s
2012
-BE-
2810
2-P
Mis
e à
quat
re v
oies
de
la li
gne
161
entr
e W
ater
mae
l et
la b
ifurc
atio
n de
Lou
vain
-la-
Neu
veIn
frab
el s
aBE
Wor
k25
9,58
1,68
6.58
51,9
16,3
37.3
220
%Ye
s
2012
-DK-
2001
1-P
New
rai
lway
lin
e be
twee
n Co
penh
agen
and
Rin
gste
d (w
orks
)- u
pgra
ding
the
rai
lway
acc
ess
lines
to
the
fu-
ture
Feh
mar
n Be
lt fix
ed li
nk
Bane
danm
ark
(Rai
l Net
Den
mar
k)D
KW
ork
667,
347,
135
133,
469,
425
20%
Yes
2012
-DK-
2001
4-P
Upg
radi
ng t
he s
ectio
n fr
om R
ings
ted
to R
ødby
(wor
ks)
- up
grad
ing
the
railw
ay a
cces
s lin
es t
o th
e fu
ture
Fe-
hmar
n Be
lt fix
ed li
nk
Bane
danm
ark
(Rai
l Net
Den
mar
k)D
KW
ork
57,2
54,4
3711
,450
,887
20%
Yes
2012
-DK-
2002
7-S
New
Sto
rstr
øm B
ridge
(st
udie
s) –
upg
radi
ng t
he r
ail-
way
acc
ess
line
to t
he f
utur
e Fe
hmar
n Be
lt fix
ed li
nkBa
neda
nmar
k (R
ail N
et D
enm
ark)
DK
Stud
y30
,041
,000
15,0
20,5
0050
%Ye
s
2012
-ES-
0310
1-P
NU
EVO
ACC
ESO
SU
R FE
RRO
VIAR
IO A
L PU
ERTO
DE
BARC
ELO
NA.
FAS
E I
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k59
,000
,000
11,8
00,0
0020
%N
o
2012
-ES-
0809
4-P
Plat
form
Wor
ks o
n se
ctio
n Vi
go –
San
tiago
de
Com
-po
stel
a. E
je A
tlant
ico
de A
lta V
eloc
idad
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k22
6,94
5,52
045
,389
,104
20%
Yes
2012
-ES-
0809
5-P
Supp
ly, t
rack
ass
embl
y, e
lect
rical
, sig
nalin
g, t
elec
om-
mun
icat
ions
and
civ
il pr
otec
tion
faci
litie
s an
d se
rvic
es
for
follo
w-u
p on
sec
tion
Vigo
– A
Cor
uña.
Eje
Atlá
ntic
o Al
ta V
eloc
idad
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k19
7,09
4,61
239
,418
,922
20%
Yes
2012
-ES-
1401
6-S
Airp
ort
link
Tene
rife
Nor
th-S
outh
with
an
inno
vativ
e an
d m
oder
n ra
ilway
sys
tem
, the
Mag
lev
Cabi
ldo
Insu
lar
de T
ener
ifeES
Stud
y1,
000,
000
500,
000
50%
No
2012
-ES-
1602
9-S
Tech
nica
l Ac
tuat
ions
for
the
opt
imiz
atio
n of
Fre
ight
Ra
ilway
Axi
s Si
nes/
Alge
cira
s-M
adrid
-Par
ís (
PP16
) an
d th
e pl
anni
ng o
n th
e Sp
anis
h ex
istin
g pa
rt
Fund
acio
n Tr
ansp
irena
ica-
Trav
esia
Ce
ntra
l del
Piri
neo
ESSt
udy
1,20
0,00
060
0,00
050
%N
o
2012
-ES-
1900
4-P
Mad
rid-G
alic
ia H
igh-
Spee
d Ra
il. S
ectio
n: C
erna
dilla
-Pe
dral
ba d
e la
Pra
dería
-Pad
orne
lo T
unne
lSO
CIED
AD E
STAT
AL D
E IN
FRAE
STRU
C-TU
RAS
DEL
TRA
NSP
ORT
E TE
RRES
TRE,
S.
A.
ESW
ork
219,
054,
606.
8943
,810
,921
.38
20%
Yes
2012
-ES-
1900
5-P
Mad
rid-G
alic
ia H
igh-
Spee
d m
ixed
tra
ffic
Rail.
Sec
tion:
Za
mor
a-La
Hin
iest
aSO
CIED
AD E
STAT
AL D
E IN
FRAE
STRU
C-TU
RAS
DEL
TRA
NSP
ORT
E TE
RRES
TRE,
S.
A.
ESW
ork
44,1
97,4
82.2
68,
839,
496.
4520
%Ye
s
2012
-ES-
1904
2-P
IMPL
ANTA
CIÓ
N D
EL A
NCH
O U
IC E
N E
L CO
RRED
OR
MED
ITER
RÁN
EO.
TRAM
O:
VAN
DEL
LÓS-
ALM
USS
AFES
. FA
SE 1
.
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k48
3,88
0,60
096
,776
,120
20%
Yes
2012
-ES-
1908
2-P
Plat
form
Wor
ks o
n su
bsec
tion
San
Isid
ro -
Orih
uela
an
d se
rvic
es f
or f
ollo
w-u
p w
orks
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k12
8,32
4,44
525
,664
,889
20%
Yes
2012
-ES-
1908
4-P
Plat
form
wor
ks o
n th
e su
bsec
tions
Lub
ian
- Tu
nel d
e la
Can
da, T
unel
de
la C
anda
- V
ilave
lla a
nd T
unel
de
O
Cañi
zo (V
ia iz
quie
rda)
and
ser
vice
s fo
r fol
low
-up
wor
ks
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k20
2,25
9,18
040
,451
,836
20%
Yes
30 31
2012
-ES-
1908
5-P
Plat
form
and
Tra
ck B
ed W
orks
on
the
subs
ectio
ns
“Nud
o de
La
Enci
na –
Mog
ente
and
Mog
ente
-Alc
udia
de
Cre
spin
s”
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k59
,243
,785
11,8
48,7
5720
%N
o
2012
-ES-
1908
8-P
Supp
ly, T
rack
ass
embl
y an
d En
ergy
fac
ilitie
s on
the
Ol-
med
o -
Zam
ora
- Pe
dral
ba d
e la
Pra
dería
HSR
L se
ctio
nAD
MIN
ISTR
ADO
R D
E IN
FRAE
STRU
CTU
-RA
S FE
RRO
VIAR
IAS
ESW
ork
162,
367,
078
32,4
73,4
1620
%Ye
s
2012
-ES-
1909
7-P
Supp
ly, t
rack
ass
embl
y, e
lect
rical
, sig
nalin
g, t
elec
om-
mun
icat
ion
acou
stic
and
civ
il pr
otec
tion
faci
litie
s on
th
e se
ctio
n Al
bace
te-A
lican
te o
f th
e H
SRL
Mad
rid-
Leva
nte
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k19
4,99
0,23
238
,998
,046
20%
Yes
2012
-ES-
1911
4-P
Supp
ly,
trac
k as
sem
bly
and
com
plem
enta
ry w
orks
, el
ectr
ical
, sig
nalin
g an
d te
leco
mm
unic
atio
ns f
acili
ties
on t
he M
edite
rran
ean
Corr
idor
Rai
lway
Lin
k -
LAV
Ma-
drid
- B
arce
lona
- F
renc
h Bo
rder
ADM
INIS
TRAD
OR
DE
INFR
AEST
RUCT
U-
RAS
FERR
OVI
ARIA
SES
Wor
k20
1,62
3,44
240
,324
,689
20%
Yes
2012
-EU
-160
19-S
Estu
dios
par
a la
ade
cuac
ión
de l
as i
nfra
estr
uctu
ras
exis
tent
es
en
la
línea
in
tern
acio
nal
Zara
goza
-Can
-fr
anc-
Pau
de c
ara
al r
esta
blec
imie
nto
de l
os t
ráfic
os
ferr
ovia
rios
Gob
iern
o de
Ara
gón
EUSt
udy
7,86
9,52
43,
934,
762
50%
No
2012
-EU
-171
18-P
Conn
ectin
g Pr
iorit
y Pr
ojec
t TE
N A
xis
17 (
rail)
with
Pri-
ority
Pro
ject
18
(IWW
): Pr
iorit
y Pr
ojec
t in
Sub
-Sec
tion
Salz
burg
-Wie
n: E
NN
S M
ULT
IMO
DAL
Kain
dl In
vest
Gm
bHEU
Wor
k73
,739
,476
.40
14,7
47,8
9520
%Ye
s
2012
-FI-
1206
3-P
E18
Ring
Roa
d III
2nd
pha
se (A
irpor
t ro
ad)
The
Min
istr
y of
Tra
nspo
rt a
nd C
omm
u-ni
catio
nsFI
Wor
k87
,600
,000
18,0
30,0
0020
.58%
Yes
2012
-FI-
1211
9-P
E18
mot
orw
ay a
t Ko
tka
The
Min
istr
y of
Tra
nspo
rt a
nd C
omm
u-ni
catio
nsFI
Wor
k32
,000
,000
6,67
0,00
020
.84%
Yes
2012
-FR-
0305
2-P
Dép
loie
men
t du
GSM
-R s
ur le
s pr
ojet
s pr
iorit
aire
sM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppe-
men
t du
rabl
e, e
t de
l’én
ergi
eFR
Wor
k10
3,47
8,26
123
,293
,226
22.5
1%Ye
s
2012
-FR-
0311
0-P
Lign
e à
gran
de v
itess
e Su
d Eu
rope
Atla
ntiq
ue (
LGV
SEA)
- T
ours
Bor
deau
xM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppe-
men
t du
rabl
e, e
t de
l’én
ergi
eFR
Wor
k3,
624,
944,
058
724,
988,
811
20%
Yes
2012
-FR-
0311
2-S
Lign
e no
uvel
le f
erro
viai
re e
ntre
Mon
tpel
lier
et P
erpi
g-na
nM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppe-
men
t du
rabl
e, e
t de
l’én
ergi
eFR
Stud
y10
,000
,000
5,00
0,00
050
%N
o
2012
-FR-
1605
5-P
Olo
ron
Bedo
usM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppe-
men
t du
rabl
e, e
t de
l’én
ergi
eFR
Wor
k10
2,00
0,00
030
,600
,000
30%
Yes
2012
-FR-
1705
1-P
Lign
e à
gran
de v
itess
e Es
t Eu
ropé
enne
pha
se 2
(LG
V EE
) - B
audr
ecou
rt V
ende
nhei
mM
inis
tère
de
l'éco
logi
e, d
u dé
velo
ppe-
men
t du
rabl
e, e
t de
l’én
ergi
eFR
Wor
k67
0,00
0,00
013
4,00
0,00
020
%Ye
s
2012
-IE-
2603
5-P
Rem
oval
of
Leve
l Cro
ssin
g an
d Co
nstr
uctio
n of
Ove
r-br
idge
at
Reill
y's
Cros
sing
on
the
Dub
lin t
o M
ayno
oth
Rail
Line
Dep
artm
ent
of T
rans
port
, Tou
rism
and
Sp
ort
IEW
ork
7,88
9,00
01,
578,
000
20%
No
2012
-IE-
2603
8-S
Dev
elop
men
t of
a
repl
acem
ent
Cent
ralis
ed
Traffi
c Co
ntro
l Ce
ntre
- S
trat
egy
Stud
y an
d D
etai
led
Des
ign
for
Tend
er
Dep
artm
ent
of T
rans
port
, Tou
rism
and
Sp
ort
IESt
udy
2,48
2,00
01,
241,
000
50%
No
2012
-IT-
0107
3-P
Pote
nzia
men
to t
ecno
logi
co N
odo
di R
oma:
fas
i.M
inis
tero
de
lle
Infr
astr
uttu
re
e de
i Tr
aspo
rti
ITW
ork
71,4
00,0
0014
,280
,000
20%
No
2012
-IT-
0107
7-P
Pote
nzia
men
to T
ecno
logi
co N
odo
di F
irenz
e.M
inis
tero
de
lle
Infr
astr
uttu
re
e de
i Tr
aspo
rti
ITW
ork
26,8
26,0
005,
365,
200
20%
No
2012
-IT-
0107
8-P
Nod
o AV
/AC
di B
olog
na:
com
plet
amen
to p
assa
nte
e op
ere
ferr
ovia
rie d
ella
sta
zion
e AV
.M
inis
tero
de
lle
Infr
astr
uttu
re
e de
i Tr
aspo
rti
ITW
ork
77,9
33,6
2515
,586
,725
20%
Yes
30 31
2012
-IT-
0110
9-S
MPM
– B
Z M
aste
rpla
n Pi
ano
Mob
ilità
sta
zion
e fe
rrov
i-ar
ia d
i Bol
zano
Area
le B
olza
no -
ABZ
S.p
.A.
ITSt
udy
2,51
9,57
4.30
1,25
9,78
7.15
50%
No
2012
-IT-
0607
4-S
Cint
ura
di T
orin
o : P
roge
ttaz
ione
Defi
nitiv
a tr
atta
Av-
iglia
na -
Orb
assa
no.
Min
iste
ro
delle
In
fras
trut
ture
e
dei
Tras
port
iIT
Stud
y32
,310
,000
16,1
55,0
0050
%N
o
2012
-IT-
0607
5-P
Pote
nzia
men
to T
ecno
logi
co T
orin
o -
Pado
va: i
mpi
anti
di li
nea
e di
sta
zion
e.M
inis
tero
de
lle
Infr
astr
uttu
re
e de
i Tr
aspo
rti
ITW
ork
211,
289,
940
42,2
57,9
8820
%Ye
s
2012
-IT-
2407
6-P
Trat
ta A
V/AC
Ter
zo V
alic
o de
i Gio
vi: o
pere
1°
e 2°
lott
o co
stru
ttiv
o.M
inis
tero
de
lle
Infr
astr
uttu
re
e de
i Tr
aspo
rti
ITW
ork
463,
706,
340
92,7
41,2
6820
%Ye
s
2012
-LU
-280
32-P
Luxe
mbo
urg
rail
netw
ork.
Eu
roCa
p-Ra
il.
Line
fr
om
Luxe
mbo
urg
to
Klei
nbet
tinge
n (lu
xem
bour
g/be
lgia
n bo
rder
). Re
-ele
ctrifi
catio
n of
the
rai
lway
lin
e in
2AC
25
kV 5
0Hz.
Min
istè
re d
u D
ével
oppe
men
t du
rabl
e et
des
Infr
astr
uctu
res
LUW
ork
39,8
93,1
257,
978,
625
20%
No
2012
-NL-
2400
8-P
Exte
nsio
n ra
ilway
yar
d M
aasv
lakt
e W
est
- Po
rt o
f Ro
t-te
rdam
– r
ail f
reig
ht c
orrid
or 8
(PP
24)
- ph
ase
2 Im
-pl
emen
tatio
n
ProR
ail B
.V.
NL
Wor
k76
,449
,003
15,2
89,8
0020
%N
o
2012
-NL-
2400
9-S
Des
ign
exte
nsio
n ra
ilway
ya
rd
Rail
Serv
ice
Cent
re
Waa
lhav
en Z
uid
– Po
rt o
f Ro
tter
dam
ProR
ail B
.V.
NL
Stud
y2,
912,
235
1,45
6,11
750
%N
o
2012
-SE-
1202
1-S
The
Wes
tern
Lin
k -
railw
ay t
unne
l in
Got
henb
urg
Swed
ish
Tran
spor
t Ad
min
istr
atio
nSE
Stud
y58
,104
,846
29,0
52,4
2350
%Ye
s
2012
-SE-
1202
6-P
Rout
e E4
Rel
ievi
ng o
f bo
ttle
neck
s an
d in
crea
sed
ca-
paci
ty w
est
of H
agas
tade
nTr
afikv
erke
tSE
Wor
k54
,736
,000
10,9
47,2
0020
%N
o
2012
-SE-
1203
6-S
Stoc
khol
m B
ypas
s, d
evel
opm
ent o
f co
nstr
uctio
n Pl
ans.
Trafi
kver
ket
(Sw
edis
h Tr
ansp
ort
Ad-
min
istr
atio
n)SE
Stud
y11
6,40
5,00
058
,202
,500
50%
Yes
2012
-SE-
1204
4-P
Fina
l se
ctio
n of
th
e E6
m
otor
way
Co
penh
agen
-G
othe
nbur
g-O
slo
Swed
ish
Tran
spor
t Ad
min
istr
atio
nSE
Wor
k71
,011
,950
14,2
02,3
9020
%Ye
s
2012
-SE-
1204
7-P
The
prio
rity
proj
ect
City
line
Stoc
khol
m –
an
impo
rtan
t lin
k in
the
Nor
dic
Tria
ngle
Swed
ish
Tran
spor
t Ad
min
istr
atio
nSE
Wor
k59
8,37
2,00
011
9,67
4,30
020
.%Ye
s
2012
-SE-
1206
8-P
E6.2
1 M
arie
holm
Tun
nel
Swed
ish
Tran
spor
t Ad
min
istr
atio
nSE
Wor
k11
4,75
7,20
822
,951
,442
20%
Yes
2012
-UK-
1303
9-P
Rem
ovin
g Bo
ttle
neck
s on
Prio
rity
Axis
13:
A75
Im
-pr
ovem
ents
Dep
artm
ent
for
Tran
spor
tU
KW
ork
30,1
90,8
63.3
06,
038,
172.
6620
%Ye
s
2012
-UK-
1309
0-P
Rem
ovin
g Bo
ttle
neck
s on
PP1
3: A
14 J
7 -
9 Ke
tter
ing
Bypa
ss Im
prov
emen
tD
epar
tmen
t fo
r Tr
ansp
ort
UK
Wor
k99
,678
,259
19,9
35,6
5120
%Ye
s
2012
-UK-
1309
1-P
Rem
ovin
g Bo
ttle
neck
s on
PP1
3: M
6 J1
0a -
13
Man
-ag
ed M
otor
way
Sch
eme
Dep
artm
ent
for
Tran
spor
tU
KW
ork
46,7
82,5
469,
356,
508
20%
Yes
2012
-UK-
2601
7-P
Port
Sal
ford
– R
emov
ing
Bott
lene
cks
and
Impr
ovin
g In
term
odal
ity o
n Pr
iorit
y Ax
es P
P26
and
PP14
Dep
artm
ent
for
Tran
spor
tU
KW
ork
37,4
52,6
807,
490,
536
20%
Yes
2012
-UK-
2606
2-P
Com
plet
ing
Prio
rity
Axis
26
(Liv
erpo
ol t
o H
ull)
and
Del
iver
ing
the
TEN
-T C
ore
Rail
Net
wor
k in
the
Uni
ted
King
dom
: Nor
ther
n H
ub
Dep
artm
ent
for
Tran
spor
tU
KW
ork
114,
267,
457.
9022
,853
,491
.57
20%
Yes
2012
-UK-
2606
5-S
PP26
: Im
prov
ing
Inte
rmod
al A
cces
s to
Liv
erpo
ol P
ort
Dep
artm
ent
for
Tran
spor
tU
KSt
udy
1,11
8,40
055
9,20
050
%N
o
32 33
PPs
- Pr
iorit
y Pr
ojec
ts (O
ngoi
ng A
ctio
ns)
Prop
osal
N
umbe
r Ti
tle
(Coo
rdin
atin
g)
Appl
ican
tM
SSt
udy/
Wor
ks/M
ixTo
tal e
ligib
le
cost
s €
TEN
-T
requ
este
d fu
ndin
g €
% T
EN-T
re
ques
ted
fu
ndin
g
Exte
rnal
Eva
luat
ion
Reco
mm
enda
tion
2012
-AT-
0108
0-P
Wor
ks f
or c
onst
ruct
ion
of n
ew h
igh
spee
d lin
e be
-tw
een
Kund
l/Rad
feld
and
Bau
mki
rche
nBu
ndes
min
iste
rium
für
Ver
kehr
, In
no-
vatio
n un
d Te
chno
logi
eAT
Wor
k86
,400
,000
12,9
60,0
0015
%Ye
s
2012
-AT-
1704
5-P
Wor
ks a
nd S
tudi
es fo
r upg
radi
ng th
e W
ien
- Br
atis
lava
ra
ilway
line
(6 s
ubpr
ojec
ts)
Bund
esm
inis
teriu
m f
ür V
erke
hr,
Inno
-va
tion
und
Tech
nolo
gie
ATW
ork
377,
480,
000
60,2
83,5
5715
.97%
Yes
2012
-BE-
0210
4-P
Dia
bolo
- R
acco
rdem
ent
ferr
ovia
ire d
e l'a
érop
ort
de
Zave
ntem
au
rése
au à
gra
nde
vite
sse
Thal
ysIn
frab
el S
ABE
Wor
k32
,255
,511
.32
6,45
1,10
2.26
20%
Yes
2012
-BE-
2811
1-P
Euro
Cap-
Rail
Infr
abel
sa
BEW
ork
194,
513,
459.
1238
,902
,691
.83
20%
Yes
2012
-EU
-210
28-P
Balti
c Se
a H
ub a
nd S
poke
s Pr
ojec
tTh
e M
unic
ipal
ity o
f Aa
rhus
EUW
ork
83,6
64,6
4021
,450
,401
25.6
4%Ye
s
2012
-SE-
1202
0-P
Wor
ks fo
r con
stru
ctio
n of
the
road
sec
tion
Nor
ra L
änk-
en. (
Nor
ther
n Li
nk) I
ncre
ased
sup
port
Trafi
kver
ket
(Sw
edis
h Tr
ansp
ort
Ad-
min
istr
atio
n)SE
Wor
k25
1,63
2,80
950
,326
,561
20%
Yes
34
3. Info sheets of project proposals submitted under the 2012 TEN-T Multi-Annual Call for Proposals
1. Project proposals recommended for funding
2. Project proposals NOT recommended for funding
89 project info sheets starting on page 35
100 project info sheets starting on page 131
This section contains the info sheets of the individual project proposals recommended and not recommended for funding organised by priority and transport mode.
ATM ............................................................................................................................................................................................................................................... 35ERTMS .......................................................................................................................................................................................................................................... 39ITS/EETS...................................................................................................................................................................................................................................... 54MoS ............................................................................................................................................................................................................................................... 57RIS.................................................................................................................................................................................................................................................. 71PPs (New Actions) ................................................................................................................................................................................................................. 76PPs (Ongoing Actions) ..................................................................................................................................................................................................... 116
ATM ............................................................................................................................................................................................................................................ 131ERTMS ....................................................................................................................................................................................................................................... 135ITS/EETS................................................................................................................................................................................................................................... 141MoS ............................................................................................................................................................................................................................................ 146PPs (New Actions) .............................................................................................................................................................................................................. 151PPs (Ongoing Actions) ..................................................................................................................................................................................................... 179
• Remarks go here •
Evaluation remarks
36
TheproposedActionisconsideredtobeveryrelevantasitfullyaddressesallthecriteriaandtheobjectivesestablishedforthecallforproposalsandasithasaclearlinkagetotheInterimDeploymentPlan.Itsmaturityisconsideredtobegood.Overall,theproposedActiondemonstratesahighpotentialimpact,whichisprimarilybasedonimpactsarisingfromtheglobalimplementationoftheInterimDeploymentPlan.Theproposalisclearandcoherent.
Evaluation remarks
Activities to support the implementation of the IDP within
DANUBE FAB2012-EU-40003-S
The aim of the Action is the deployment of the initial set of SESAR solutions at DANUBE FAB level, concretely the air ground data link and airspace management (free routes). As such, it addresses the priorities of the Interim Deployment
Programme (IDP), which describes the implementation activities of essential ATM operational changes as identified by the European Air Traffic Management Master Plan and which details short term implementation activities.
ATMMember States involved:Bulgaria, Romania
Applicant:State Enterprise “Bulgarian Air Traffic Services Authority” BULATSA
Requested fundingTotal eligible costs €2,788,420
TEN-T requested funding: €1,394,210
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €2,788,000
TEN-T recommended funding: €1,394,000
TEN-T funding: 50%
Evaluation remarks
37
TheproposedActionisrelevanttothecallforproposalsasitaimstomakethefirststepincoordinatingthevariousstakeholdersinvolvedintheInterimDeploymentPlanandcreatingabaselineofSESAR.Overall,theproposalisverymatureandreadytostartasitisbuildingonpreviousworkundertaken.TheimpactoftheproposedActionisgoodandconsideredtobeprovidedbythecontributaryachievementstowardstheInterimDeploymentPlan.Thequalityisgood.
The proposed Action aims at supporting the implementation of the key technological enablers and procedures as defined in the Interim Deployment Programme (IDP).
Based on the IDP, which derives from the European ATM Master Plan and focuses on the SESAR baseline, the present Action aims at fostering the implementation of five out of the seven IDP Activity Areas in order to achieve the requested initial operational capability by December 2014:
•Activityarea2-Airspacemanagementimprovementsanddatasharing•Activityarea3-AirportCDM•Activityarea4-Air-grounddatalink•ActivityArea5-Automatedassistancetocontrollersforseamlesscoordinationtransferanddialogue•ActivityArea6-RNPApproach
ATMMember States involved:Italy, Cyprus, Germany, Estonia, Spain, Finland, France, Latvia, Malta, Portugal, United Kingdom
Applicant:ENAV S.p.A.
Requested fundingTotal eligible costs €253,778,950.55
TEN-T requested funding: €50,755,790.11
TEN-T funding: 20%
Recommended fundingTotal eligible costs €253,775,000
TEN-T recommended funding: €50,755,000
TEN-T funding: 20%
2012-EU-40004-P
ANSPs interim deployment programme implementation
• Remarks go here •
Evaluation remarks
38
TheproposedActionishighlyrelevantasitaddressestheTEN-Tprioritiesverywellandsupportstheobjectivesandexpectedresultsofthecallforproposals.Itishighlymature,asitisusesexistinginteroperabilityspecificationsandhasreceivednecessaryapprovals.Moreover,theproposedActionbuildsonworkalreadyundertakenandonthefurtherdevelopmentoftwoexistingsystems.Theproposalisexpectedtomakeapositivecontributiontoglobalinteroperabil-ity.Overall,theproposal’squalityissufficientlygood.
Evaluation remarks
Accelerating the deployment of advanced FDP capabilities in Europe
2012-EU-40006-S
The proposed Action is a study to support the achievement of improved ATM performance (safety, capacity, flight efficiency and cost effectiveness) by accelerating the development and thus implementation of advanced Flight Data Processing
(FDP) capabilities in the European Area. It will be undertaken by members of the “A6” group of Air Navigation Service Provid-ers: AENA (Spain), Austro Control (Austria), DFS (Germany), DSNA (France), ENAV (Italy), IAA (Ireland), LFV (Sweden) and NATS (UK). Austro Control, IAA and LFV are members of the NORACON consortium, which constitutes the sixth member of the A6.
ATMMember States involved:United Kingdom, Austria, Germany, Spain, France, Ireland, Italy, Sweden
Applicant:
NATS (EN ROUTE) PLC
Requested fundingTotal eligible costs €13,310,512.70
TEN-T requested funding: €6,655,256.35
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €13,310,000
TEN-T recommended funding: €6,655,000
TEN-T funding: 50%
39
Multi-Annual Call 2012Projects recommended for funding
European Rail Traffic Management System
ERTMS
Evaluation remarks
40
ERTMSMember States involved:Belgium
Applicant:Infrabel nv
Requested fundingTotal eligible costs €23,954,580
TEN-T requested funding: €11,977,290
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €23,854,000
TEN-T recommended funding: €11,927,000
TEN-T funding: 50%
The Global Project aims to equip the entire Belgian rail network and train fleet with ETCS by 2022 (as indicated in both Infrabel and NMBS’s ETCS master plans). The proposed Action concerns the equipment of three new lines and the upgrade
of two existing lines with ERTMS Level 1/2, ETCS version 2.3.0d (totalling +/- 146 km double track and 4 km single track line).
TheproposedActionisrelevanttothecallforproposalsandinlinewiththeTEN-Tpriorities.Itsmaturityisgood.ThemainpositiveimpactsoftheActionwillbeonsafety,qualityofservice,interoperablityandtrafficmanagement.Thequalityoftheproposalisgood.
2012-BE-60027-P
Equipment of ETCS1 on HSL L2, upgrade of HSL L3 and L4 to ETCS2 v2.3.0d, equipment
of ETCS1 v2.3.0d on L10 and L36C/2
Evaluation remarks
41
TheproposedActionsufficientlydemonstrateditshighrelevancetothecallforproposalsandTEN-TprioritiesasitaddressesERTMSdeployment.ThematurityoftheActionisgoodandsois itsexpectedimpact.Thequalityoftheproposalisgood.
The proposal concerns equipment of 15 class 185.2 locomotives (+10 optional locomotives) with ETCS Level 2 (and Level 1 with Euroloop) SRS 2.3.0d (with hardware prepared for Baseline 3). It is part of a Global Project that aims at creating
an international pool of ETCS locomotives owned by the applicant, that will use the ETCS trackside equipment in The Nether-lands and Switzerland, as well as Austria, Denmark, Sweden, France, Belgium, Italy and Germany in the future. Following the completion of the Action, the locomotives will be authorised to operate on the ERTMS equipped lines in Austria and Germany.
ETCS equipment of DB Schenker Rail locomo-tives for interoperable freight traffic in
Austria (TEN-T PP17 and ERTMS Corridor B)
2012-DE-60013-P
ERTMS Member States involved:Germany
Applicant:DB Schenker Rail AG
Requested fundingTotal eligible costs €3,750,000
TEN-T requested funding: €1,875,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €2,250,000
TEN-T recommended funding: €1,125,000
TEN-T funding: 50%
Evaluation remarks
42
TheproposedActionfullymeetstheobjectivesandconditionsofthecallforproposalsasanimportantstepforthede-ploymentandoperationoftheonboardEuropeanTrainControlSystem.TheActionismatureasithasalreadystarted.TheimpactoftheActionishighlypositiveandverywellsubstantiated.Theproposalisofgoodquality.
TheproposedactionispartoftheGlobalProjectimplementedbyDBSchenkerRail(DBSR)withtheaimtocreateanin-ternationalfleetofinteroperablelocomotivesthatwillusetheETCStracksideequipmentintheNetherlands,Switzerland,
Austria,Denmark,Sweden,France,Belgium,ItalyandGermany.TheActionincludesworkstoretrofit47locomotivesclass185(ETCSLevel2)withSRS2.3.0d(withhardwarepreparedforbaseline3andupgradeof10locomotivesclass185(ETCSLevel2)fromSRS2.2.2(+CR)to2.3.0d(withhardwarepreparedforbaseline3).
ETCS equipment of DB Schenker Rail locomotives for interoperable freight
traffic on ERTMS Corridor A2012-DE-60014-P
ERTMS Member States involved:Germany
Applicant:DB Schenker Rail AG
Requested fundingTotal eligible costs €8,850,000
TEN-T requested funding: €4,425,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €8,850,000
TEN-T recommended funding: €4,425,000
TEN-T funding: 50%
Evaluation remarks
43
TheproposedActionisveryrelevanttothecallforpropsoalsasitcontributestoERTMSdeployment.TheActionisreadytostartfromthetechnicalpointofview.Itisexpectedtohaveaverygoodimpactintermsofsafetyandinteroper-ability,aswellasinenvironmentalterms.Theoverallqualityoftheproposalissatisfactory.
The proposed Action consists of an upgrade of 10 BR189 locomotives to ETCS baseline 3, and retrofit of 6 BR185 locomotives and 8 EU43 locomotives to ETCS baseline 2.
2012-DE-60025-P
Upgrade, prototyping, retrofitting and testing LOKOMOTION locomotives to
ETCS 2.3.0d / Baseline 3
ERTMSMember States involved:Germany
Applicant:Lokomotion Gesellschaft für Schienentrak-tion mbH
Requested fundingTotal eligible costs €9,090,000
TEN-T requested funding: €1,800,000
TEN-T funding: 19.8%
Recommended fundingTotal eligible costs: €9,090,000
TEN-T recommended funding: €1,800,000
TEN-T funding: 19.8%
Evaluation remarks
44
The proposed Action is relevant to the call for proposals as it addresses ERTMS deployment. Itsmaturity is welldemonstratedastheActionisreadytostartfromatechnicalpointofview.ItisexpectedthattheActionwillproducesignificantsocio-economicimpacts.Thequalityoftheproposalisgood.Takingintoaccountthescarcityoffunds,thesupporttothisActionaimsatoptimisingtheeffectivenessofTEN-Tfunding.
TThepurposeoftheAction istoestablishanoperational level2ETCSrailwayontheLangaa(exclusive)-Frederikshavn(inclusive)line.PartofTEN-Tnetwork,itisalsoanEarlyDeploymentLine(EDL)intheroll-outofETCSlevel2inwestern
Denmark.Itisamixofdoubleandsingletrackwithmixedtraffic,butmainlypassengertrains.TheActioncoversatotalre-newalofallsignallingsysteminstallationsonthelineandincludesgenericdesignactivitiesforthenewETCSbasedrailwayandengineering,production,installationandtesting.ItisalsopartoftheGlobalProject“SignallingProgramme”,oneofthefirstEuropeanprojectstoimplementETCSBaseline3.
Early deployment of ERTMS Baseline 3 in Denmark
2012-DK-60002-P
ERTMS Member States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested fundingTotal eligible costs €117,967,095
TEN-T requested funding: €58,983,547
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €40,000,000
TEN-T recommended funding: €20,000,000
TEN-T funding: 50%
Evaluation remarks
45
The proposed Action has a high relevance to the call for proposals and impact due to the number of RailwayUndertakingsinvolvedandthelargenumberofvehiclestobeequippedwithERTMS.ThematurityoftheproposedActionissatisfactoryanditsoverallqualityisgood.
The proposal concerns deployment of ERTMS level 2 (fitment and retrofitment) of 341 vehicles owned by 14 railway undertakings in Sweden. It is a part of a Global Project that covers ERTMS onboard and track-side deployment in the coun-
try, which counts an estimated 800-1200 vehicles subject to ERTMS deployment.
2012-EU-60020-P
Deployment of ERTMS onboardequipment in Sweden 2012-2015
ERTMSMember States involved:Sweden, United Kingdom
Applicant:Trafikverket
Requested fundingTotal eligible costs €90,090,000
TEN-T requested funding: €30,325,000
TEN-T funding: 33.66%
Recommended fundingTotal eligible costs: €24,350,000
TEN-T recommended funding: €8,198,000
TEN-T funding: 33.67%
Evaluation remarks
46
TheproposedActionisoverallrelevanttothecallforproposals.Itdemonstratesanexcellentmaturityandverygoodimpact.AnumberofactivitieshavealreadystartedandtheoverallresultsofthecompletedActionwillbebeneficialforthemaintenanceandimprovementofERTMSspecificationsaswellasfortheimplementationofseveralpartsoftheMemorandumofUnderstandingsignedbythesectorinApril2012.ThequalityoftheproposedActionisgood.
The proposal concerns a number of activities supporting the implementation of the third Memorandum of Understanding (MoU of 16 April 2012) signed between the European Commission and the European rail associations in the field of ERTMS.
Successful implementation of the MoU provisions forms a Global Project. The study/development activities covered by the Action aim at standardisation of ERTMS specifications and facilitation of the related processes (e.g. authorisation of ERTMS equipped vehicles and track-side).
Facilitating and speeding up ERTMS - 2nd phase
2012-EU-60022-S
ERTMS Member States involved:Belgium, Germany, Spain, Finland, France,
Applicant:EEIG ERTMS Users Group
Requested fundingTotal eligible costs €15,083,000
TEN-T requested funding: €7,541,500
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €6,346,000
TEN-T recommended funding: €3,173,000
TEN-T funding: 50%
Evaluation remarks
47
TheproposedAction is very relevant to the call for proposalsas it concerns the retrofitmentwithEuropeanTrainControlSystem(ETCS),Baseline2of13freightlocomotives.TheproposedActionismatureandreadytostartfromthetechnicalpointofview.Itwillhaveagoodimpactintermsofsafetyandinteroperability.Thequalityisgood.
The action concerns the retrofitment with ETCS Baseline 2 of 13 freight locomotives. The locomotives belong to four private railway undertakings from Austria and Slovenia. Once retrofitted, the locomotives will operate on the ERTMS (level 1 and
2) lines of Austria, Germany, Hungary, Slovenia, Czech Republic, Slovakia and Switzerland.
2012-EU-60033-P
CEE goes ECTS
ERTMSMember States involved:Austria, Slovenia
Applicant:CargoServ Gmbh
Requested fundingTotal eligible costs €5,303,069
TEN-T requested funding: €1,659,570
TEN-T funding: 31.29%
Recommended fundingTotal eligible costs: €5,303,000
TEN-T recommended funding: €1,659,000
TEN-T funding: 31.28%
Evaluation remarks
48
TheproposedAction’soverallrelevance isgoodas itrelatestothedeploymentofERTMSalongtheItalianrailwaysystem.Ithasalreadystartedandisthereforeconsideredasverymature.TheproposedActionwillhaveagoodimpactoninteroperability.Thequalityisalsogood.
The Global Project concerns the deployment of ERTMS on the Italian railway network. The proposed Action entails off-site and field tests to support the migration from the existing national signalling system (SCMT - Sistema Controllo Marcia
Treno), towards ERTMS/ETCS interoperable solutions.
Off-site and field testing to support Italian ERTMS migration strategy
2012-IT-60009-P
ERTMS Member States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €6,000,000
TEN-T requested funding: €3,000,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €4,822,000
TEN-T recommended funding: €2,411,000
TEN-T funding: 50%
Evaluation remarks
49
TheproposedAction ishighlyrelevanttothecallforproposalsas itconcernstheon-boarddeploymentofERTMS.Thematurityoftheproposalisadequate.Itwillhaveaverygoodimpactintermsofsafetyandinteroperability.Theproposal’squalityisgood.
The Global Project addresses the fitment of 50 train sets ETR 1000 (high speed trains) with ETCS baseline 2, release 2.3.0d. The proposed Action concerns the fitting of 12 train sets ETR 1000 with ETCS baseline 2, release 2.3.0d.
2012-IT-60012-P
Equipment of ETR 1000 trainsets with ETCS Baseline 2 release 2.3.0d
ERTMSMember States involved:Italy
Applicant:Trenitalia S.p.A.
Requested fundingTotal eligible costs €5,355,000
TEN-T requested funding: €2,677,500
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €2,858,000
TEN-T recommended funding: €1,429,000
TEN-T funding: 50%
Evaluation remarks
50
TheproposedAction ishighlyrelevanttothecall forproposalsas itconcernsthetracksidedeploymentofERTMS.Thematurityoftheproposalisadequate.Itwillhaveaverygoodimpactintermsofsafetyandinteroperability.Theproposal’squalityisgood.
TheGlobalProjectaddressestheERTMtracksidedeploymentalongtheTorino-Napolihighspeedline.TheproposedActionisaimedatupgradingtheERTMS/ETCStracksidesystemofthe230kmlongRoma-Napolisectionto2.3.0dspecification.
Upgrade of Roma-Napoli high speed line in order to ensure compatibility
with ERTMS baseline 2.3.0d2012-IT-60018-P
ERTMS Member States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €6,000,000
TEN-T requested funding: €3,000,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €6,000,000
TEN-T recommended funding: €3,000,000
TEN-T funding: 50%
Evaluation remarks
51
TheproposedActionishighlyrelevantandfullymeetstheobjectivesofthecallforproposals.Itisverymatureandsomeofitsactivitiesarealreadyongoing.ThemainstrengthoftheproposedActionisitsimpactasitwillcontributetoimproveinteroperabilityanddecreasetheriskofaccidentsontheconcernedline.Thequalityoftheproposalisgood.
TheproposedActionispartoftheGlobalProjectwhichistheconnectionoftherailwayinfrastructureinMaasvlakte2(ex-tensioninthePortofRotterdam)withthemainrailwayinfrastructureHoofdspoorweginfrastructuurandtheBetuweLine
(PriorityProject5).TheActionincludesdeploymentofERTMSlevel1FullSupervisionmodeonthenewrailinfrastructureonMaasvlakte2withETCSBaseline2Release2.3.0d.
2012-NL-60005-P
Maasvlakte 2 ERTMS
ERTMSMember States involved:The Netherlands
Applicant:Port of Rotterdam
Requested fundingTotal eligible costs €11,089,839
TEN-T requested funding: €5,544,919
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €1,800,000
TEN-T recommended funding: €900,000
TEN-T funding: 50%
Evaluation remarks
52
TheproposedAction’soverallrelevanceisgood,however,someactivitiesdonotfullymatchthecriteriaidentifiedinthecallforproposals.ItisverymatureasnecessarypreparatorystepsareabouttobecompletedandtheActionisreadytostartfromatechnicalpointofview.Intermsofimpact,theproposedActionisexpectedtoincreaseinteroperabilityoftherollingstockandthusthecompetitivenessoftherailtransport.Itwillfacilitatemodalshifttorail.Thequalityoftheproposalisgood.
The proposed action is part of the Global Project with the aim to create an interoperable fleet of Mitsui Rail Capital Europe locomotives for the use on ERTMS corridors A, B, C and E. The Action includes the following activities:
•Prototypingandupgradeof84SiemensES64F4MSlocomotivesforETCSL1/L2linesinAustria,Switzerland,BelgiumandtheNetherlands.
•InstallationofETCS230din20newbuildSiemensVectronAC2andMSlocomotivesforETCSlinesinAustria,SwitzerlandandHungary.
•PrototypingofSiemensVectronACandMSlocomotivesforbaseline3.0(AlstomETCSequipment)(upgradebaseline3.0plannedfor>2016)forETCSlinesinAustria,SwitzerlandandHungary.
•PrototypingofSiemensES64U2AC15/25kVlocomotiveforbaseline3.0(SiemensETCSequipment)(upgradebaseline3.0plannedfor>2016)forETCSlinesinAustria,SwitzerlandandHungary.
2012-NL-60006-P
An ETCS baseline 230d and 3.0 program for installation, upgrade and prototyping of various types
electrical freight locomotives for usage on multiple TEN-T freight corridors and conventional networks
ERTMSMember States involved:The Netherlands
Applicant:Mitsui Rail Capital Europe B.V.
Requested fundingTotal eligible costs €44,117,872
TEN-T requested funding: €19,958,936
TEN-T funding: 45.24%
Recommended fundingTotal eligible costs: €2,000,000
TEN-T recommended funding: €1,000,000
TEN-T funding: 50%
Evaluation remarks
53
The proposal aims to upgrade two existing SRS (System Requirement Specification) and pilot lines to a one single stand-ardised Swedish SRS for ERTMS level 2, and to secure the integration between trackside systems provided by different
suppliers as well as between track-side systems and onboard equipment compliant with Baseline (BL) 2.3.0d or BL3. It is a part of Global Project that consists of ERTMS implementation in Sweden.
Intermsofrelevance,theproposedActionaddressesPriority2ofthecallforproposalswithanupgradeoftrack-sideEuropeanTrainControlSystemontwosections.IthassignificantimpactasadecisionmakingtoolforfutureERTMSdeployment.Concerningmaturity,theproposedActionisreadytostartfromthetechnicalpointofview.Thequalityoftheproposalisadequate.
Upgrade to an uniform Swedish system requirement for ERTMS,
Level 22012-SE-60028-S
ERTMSMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €14,581,755
TEN-T requested funding: €7,290,876
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €14,580,000
TEN-T recommended funding: €7,290,000
TEN-T funding: 50%
54
Multi-Annual Call 2012Projects recommended for funding
ITS-EETS
Intelligent Transport SystemsEuropean Electronic Toll Service
Evaluation remarks
55
TheproposedActionisveryrelevantandaddressestheneedofanad-hocEuropeanITSPlatform(EIP)toensureITSharmonisation and consensus-building, evaluation of former ITS deployment projects, dissemination of knowledgeandeventuallyhigh-levelcommunicationbetweenMemberStates, theEuropeanCommissionandstakeholders. ItsmaturityishighandtheproposedActionisreadytostart.Theimpactandqualityaregood.
2012-EU-50005-S
European ITS Platform (EIP)
The European ITS Platform has the potential to play a key role in harmonised European ITS deployment. It will combine resources from all EU actors (European Commission, Member States, public and private road operators) in a joint effort
to ensure the creation of a proper environment for harmonising existing and future ITS services in view of the ITS Directive’s upcoming specifications. The Platform focuses on the cooperation and consensus building between partners and with other stakeholders, evaluation of the impacts at European scale and dissemination of knowledge and experience.
ITS-EETSMember States involved:Italy, Belgium, Cyprus, Germany, Denmark, Greece, Spain, Finland, France, Ireland, Italy, The Netherlands, Portugal, Romania, Sweden, United Kingdom Applicant: Ministero delle Infrastrutture e dei Trasporti (IT)
Requested fundingTotal eligible costs €11,919,950
TEN-T requested funding: €5,959,975
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €2,700,000
TEN-T recommended funding: €1,350,000
TEN-T funding: 50%
Evaluation remarks
56
The proposed Action (REETS TEN) aims to deploy EETS compliant services in a cross-border regional project. It will cover the electronically tolled primary road network of seven Member States (Austria, Denmark, France, Germany, Italy, Poland
and Spain) and Switzerland. It aims to kick start the actual deployment of EETS, taking into account the perspective of full European coverage. The proposed Action has two main phases:
•Analysisof contractual, proceduraland technical topics, inorder todevelop recommendationsandsolutions that canfacilitatetheintroductionofEETS.
•DeploymentofanopeninformationplatformthatcoversalltheparticipatingcountriesandapilotdemonstrationofEETScompliantservicescoveringaselectionofthesupportingcountries.
2012-EU-50009-S
Regional European Electronic Toll Service (REETS TEN)
TheproposedActionisveryrelevanttothecallforproposalsandtakesaccurateaccountoftherequirementsofthepolicycontextanddeploymentframework.ItismatureandreadytostartanditsexpectedimpactwillbeenhancedthroughthecommitmentofallstakeholderstousetheframeworkforcooperationindeliveringEETScompliantserv-icesinthenextphaseoftestingandimplementationofEETS.Thequalityisgood.
ITS-EETS Member States involved:Austria, Belgium, Germany, Denmark, Spain, France, Italy, Poland
Applicant:Autobahnen- und Schnellstraßen-Finan-zierungs-Aktiengesellschaft (ASFINAG)
Requested fundingTotal eligible costs €5,244,605
TEN-T requested funding: €2,622,302.50
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €4,470,000
TEN-T recommended funding: €2,235,000
TEN-T funding: 50%
Evaluation remarks
58
ThemostsignificantpartoftheproposedActionisrelevanttothecallforproposalsandconcenrstheintroductionofLNGintheareaofMoS.TheActionisreadytostart.Thequalityandimpactoftheproposalaregood.
The European market for LNG fuel is very small and immature, with no facility for the small-scale supply of LNG. To solve the “chicken/egg situation”, in which the market is waiting for the ports to create the infrastructure and the ports, in turn,
are waiting for the market, this Action aims to take the first step by creating a break bulk infrastructure for small-scale LNG supply in the Ports of Rotterdam and Gothenburg.
The project consists of two components: the LNG break bulk facility at the Port of Rotterdam adjacent to the Gate terminal and the small-scale satellite terminal in Skarvikshamnen, Gothenburg. The Action will be implemented by a consortium of LNG Break Bulk Rotterdam C.V. (a joint venture of Vopak LNG Holding B.V. and N.V. Nederlandse Gasunie), Vopak LNG Holding B.V. and Swedegas as terminal and infrastructural operators, as well as the Ports of Rotterdam and Gothenburg.
2012-EU-21003-P • Part of Priority Project 21
LNG Rotterdam Gothenburg
MoSMember States involved:The Netherlands, Sweden
Applicant:LNG Break Bulk Rotterdam CV
Requested fundingTotal eligible costs €184,008,970
TEN-T requested funding: €36,801,794
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €171,364,000
TEN-T recommended funding: €34,272,000
TEN-T funding: 20%
Evaluation remarks
59
TheproposedActionisrelevanttothecallforproposalsasitconcernsintroductionofLNGintheareaofMoS.TheActionismatureandisexpectedtobeusefulasadecisionmakingtoolandabestpractice.Thequalityoftheproposalisgood.
This Action is composed of studies that aim at determining the feasibility of implementing LNG bunkering facilities in the Port of Roscoff (northwestern France) and the Port of Santander (northern Spain). They take into account the conform-
ity of the infrastructures and equipment with the standards for risk prevention (Seveso Directive), environmental protection and the eventual constraints, revealed by the impact assessments and the public inquiries. The findings of these studies will be essential to Brittany Ferries in order to decide about the construction of new or retrofitted LNG vessels and for port authorities in Roscoff and Santander for decisions regarding the development of LNG bunkering infrastructures.
2012-EU-21006-S • Part of Priority Project 21
SEAGAS
MoSMember States involved:France, Spain
Applicant:B.A.I.Bretagne Angleterre Irlande SA (Brittany Ferries)
Requested fundingTotal eligible costs €2,082,644
TEN-T requested funding: €1,225,321
TEN-T funding: 58.83%
Recommended fundingTotal eligible costs: €2,082,000
TEN-T recommended funding: €1,041,000
TEN-T funding: 50%
Evaluation remarks
60
TheproposedAction is relevant to thecall forproposals in theareaofMoS. Its impactandqualityaregood.ThematurityisverygoodastheActionisreadytostart.
MONALISA 2.0 aims at contributing to a continuous improvement and development of efficient, safe and environmentally friendly maritime transport in the EU by implementation of a series of measures which are also included or are in line
with the EU’s transport policies and are highly relevant with regard to the development of Motorways of the Sea.
The scope of the Action includes:
•Testingofconcreteapplicationsandserviceswhichwouldallowshort-termcommercialdeployment•Takingjointprivate-publicactiontoelaboratebetterstandardsforrouteexchangethroughacommoninterfaceanddataformat
•Demonstratingconcreteservicesusingnewtechnologytoenhancemaritimesafety,makingsearchandrescueandmass-evacuationsmoreefficientthantodayandbyaddressingportsafety
•TransferringtheresultsofpreviousEUinvestmentsinairtrafficmanagementandothersectorsintothemaritimesector
2012-EU-21007-S • Part of Priority Project 21
MONALISA 2.0
MoSMember States involved:Sweden, Germany, Denmark, Greece, Spain, Finland, Italy, Malta, United Kingdom
Applicant:Swedish Maritime Administration
Requested fundingTotal eligible costs €24,316,096
TEN-T requested funding: €12,158,048
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €24,316,000
TEN-T recommended funding: €12,158,000
TEN-T funding: 50%
Evaluation remarks
61
TheproposedAction isrelevanttotheMoScallofproposalsasawiderbenefitactionfacilitatingnavigation in icerestrictedwaters. Itsmaturity is goodandall necessary support has been provided. TheActionwill have positiveimpactsonthecohesionintheregionconcerned.Thequalityoftheproposalisgood.
WINMOS is an action aiming to further develop efficient maritime transport during winter when sea ice covers large parts of the EU’s northernmost waters.
The Action will develop and adapt the winter navigation system for the benefit of all stakeholders involved in trade and maritime transport in the Baltic Sea area. It includes further cooperation between ice breaking authorities, resource planning, as well as upgrading and renewal of the necessary icebreaking resources.
2012-EU-21008-S • Part of Priority Project 21
Winter Navigation Motorways of the Sea, WINMOS
MoSMember States involved:Sweden, Estonia, Finland
Applicant:Swedish Maritime Administration
Requested fundingTotal eligible costs €142,330,507
TEN-T requested funding: €29,677,770
TEN-T funding: 20.85%
Recommended fundingTotal eligible costs: €142,326,657
TEN-T recommended funding: €29,677,000
TEN-T funding: 20.85%
Evaluation remarks
62
TheproposedActionisoverallrelevanttothecallforproposals.Itismatureandhasalreadystarted.ItwillhaveapositiveimpactatregionalandEUlevels.ThequalityoftheproposedActionisgood.
The proposed Action is part of a Global Project aiming to implement efficient and economically viable solutions to meet the stricter sulphur legislation in 2015 in the Sulphur Emission Control Area (SECA) and support the development of a strong,
competitive, and environmentally sustainable shipping sector in the Baltic Sea. The Action is composed of works, aiming at implementing an LNG bunker supply infrastructure for the Port of Brofjorden, Lysekil, on the west coast of Sweden. It also includes technical studies, whose goal is to deploy new LNG technologies in full scale pilot actions (studies) in commercial vessels operating in the Baltic and North Seas.
It will establish a complete LNG supply and transport infrastructure including all components required to ship LNG from the supplier to the LNG terminal, from terminal to bunker vessel, and from bunker vessel to the LNG fuelled vessels.
2012-EU-21009-P • Part of Priority Project 21
Pilot: LNG bunkering infrastructure solu-tion and pilot actions for ships operating
on the Motorway of the Baltic Sea
MoSMember States involved:Sweden, France, The Netherlands, United Kingdom
Applicant:SSPA Sweden AB
Requested fundingTotal eligible costs €76,059,772
TEN-T requested funding: €23,103,387
TEN-T funding: 30.38%
Recommended fundingTotal eligible costs: €76,059,000
TEN-T recommended funding: €23,103,000
TEN-T funding: 30.38%
Evaluation remarks
63
TheproposedActionisrelevanttothecallforproposalsasapilotactionofanewtypeoflightweightscrubber.Thematurityisgoodandbackedupbythenecessarycommitments.ItwillhavepositiveimpactonthereductionofshippingemissionsintheNorthandBalticseas.TheproposedActionisofsoundquality.
The proposed pilot Action, aims at installing, evaluating and demonstrating a new generation of innovative lightweight scrubber technology in full scale on two existing ro-ro vessels, operating in the Baltic and North Seas, as well as verifying
and evaluating the specific port infrastructure and preparatory investments needed for a full scale implementation of this technology.
The project is part of a Global Project, whose goal is to find efficient and economically viable solutions to meet the stricter sulphur legislation in 2015 in the Sulphur Emission Control Area (SECA) and support the development of a strong, competitive, and environmentally sustainable shipping sector in the Baltic Sea.
It aims to apply a holistic approach of the transport chain and include all aspects and stakeholders involved, such as port representatives, as well as regulative authorities and industrial organisations.
2012-EU-21010-S • Part of Priority Project 21
PILOT SCRUBBER – new generation light-weight pilot scrubber solution installed on a ro-ro ship operating on the Motorway of the
Baltic Sea
MoSMember States involved:Sweden, Finland, The Netherlands
Applicant:SSPA Sweden AB
Requested fundingTotal eligible costs €13,583,650
TEN-T requested funding: €6,791,824
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €13,583,000
TEN-T recommended funding: €6,791,000
TEN-T funding: 50%
Evaluation remarks
64
TheproposedActionishighlyrelevanttothecallforproposalsandTEN-Tprioritiesbyimprovingtheefficiencyofanimportantmaritimelink.Itsmaturityisverygoodasmostpreliminarystepshavebeenfulfilled.TheproposedActiondemonstratesconsiderablepostiveimpacts,particularlyatregionallevelbutalsoatEUlevel.Itisofverygoodqualityinallaspects.
The Global Project is an upgrade of an existing maritime link between Finland and Estonia, an important link with direct connections to Priority Project 12 (Nordic Triangle railway/road axis) and Priority Project 27 (“Rail Baltica” axis: Warszawa-
Kaunas-Riga-Tallinn-Helsinki). The first part of the project is to upgrade a transport link through the proposed Action, linking to the PPs and existing transport networks, as well as to establish a long-term sustainable multimodal transport link.
Results and observations of studies have shown:
•During2002–2010,therewasasignificantincreaseinseabornecargotrafficbetweenFinlandandEstonia.•ThegrowthofcargovolumeontheHelsinki-Tallinnrouteisestimatedtocontinueontheannuallevelof10%duringthenextcoupleofyears.
•WhentheIMO’ssulphurregulationswillcomeintoforce,theHelsinki-TallinnroutewillbecomeamainroutetoWesternEuropeanmarkets.
•Thero/paxconceptisseenastheonlyeconomicalprofitablesolutionontheHelsinki-Tallinnroute.
2012-EU-21011-P • Part of Priority Project 21
TWIN-PORT
MoSMember States involved:Finland, Estonia
Applicant:Port of Helsinki
Requested fundingTotal eligible costs €56,300,000
TEN-T requested funding: €11,260,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €56,300,000
TEN-T recommended funding: €11,260,000
TEN-T funding: 20%
Evaluation remarks
65
TheproposedAction isvery relevant to thecall forproposalsasaimsatupgradingamaritime link in this region.Itsmaturity isguaranteed throughnecessary supportprovided,aswell as the current implementation status. TheproposedActionwillhaveconsiderableimpactontheeconomicstimulationintheregionconcernedandwillimprovetheenvironmentalperformanceoftheconnectionandtheaccessibilityofthisperipheralregion.ThequalityoftheproposedActionissatisfactory.
The Action aims at upgrading the transport link between northern Sweden and western Finland, including land and water-borne transport systems. It includes designing, constructing and improving the transport link through new transport pat-
terns, multimodal logistics and cost efficient solutions. The Action includes:
•Works:infrastructureinvestmentsmadebothcountriesinordertoimproveportlogistics,railconnectionsandportinter-modality.
•Capitalcosts:start-upaidforatemporaryferry,includingthenecessaryupgradingandadjustmentsmadeandplannedforthistemporarysolution.Theupgradingandadjustmentswillbeusedasexamplesduringtheanalysesandconceptdevelopment.
•Studies:whichincludeananalysisoftrafficmanagementandorganizationalaspectsofthetransportlink,aswellasthedevelopmentofatransportconcepttomeettheneedsandprovideagoodfoundationasinputforthedetaileddesignorprocurementofaferry.
2012-EU-21013-S • Part of Priority Project 21
Kvarken multimodal link - midway alignment of the Bothnian Corridor
MoSMember States involved:Sweden, Finland
Applicant:NLC Ferry Ab Oy
Requested fundingTotal eligible costs €23,609,015
TEN-T requested funding: €8,506,768
TEN-T funding: 36.03%
Recommended fundingTotal eligible costs: €20,734,000
TEN-T recommended funding: €6,129,000
TEN-T funding: 29.56%
Evaluation remarks
66
TheproposedActionisveryrelevanttothecallforproposalsasapilotactiontestingmethanolasanalternativefuelonships.Thematurityisveryhigh.TheproposedActionwillhavesignificantimpactsonimprovingtheenvironmentalperformanceofshipping.Thequalityisverygoodwithwelldefinedobjectivesandcorrespondingactivities.
The Action proposes the use of methanol as a pragmatic, cost-effective and environmentally friendly solution to the maritime industry’s challenges to comply with the ambitious International Maritime Organisation and EU emission reduc-
tion targets.
The project, which takes the form of a pilot Action, mainly involves the installation and testing of methanol on an existing passenger vessel and short sea route between Gothenburg and Kiel. In addition to retrofitting the vessel, the study will also create the appropriate port infrastructure for the supply of methanol for bunkering: a bunker vessel and a storage tank will be built to carry methanol, as well as the corresponding facilities in both ports.
2012-EU-21017-S • Part of Priority Project 21
Methanol: The marine fuel of the future
MoSMember States involved:Germany, Finland, Sweden
Applicant:Stena Aktiebolag
Requested fundingTotal eligible costs €22,502,000
TEN-T requested funding: €11,251,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €22,502,000
TEN-T recommended funding: €11,251,000
TEN-T funding: 50%
Evaluation remarks
67
The proposed Action is highly relevant to the call for proposals and fits the priorities as a wider benefit actioncontributingtothedevelopmentofe-maritimesolutionsandestablishmentofsinglewindows.TheproposedActionisconsideredverymatureatalllevels,whichisensuredbydirectparticipationof13MemberStates.Itwillhavesignifi-cantimpactonstandardisingandharmonisingreportingproceduresinshippingviaasystemofsinglewindows.Thequalityishighandallkeyelementsareinplace.
ANNA is an EU Member State driven project/pilot action addressing the wider benefit for MoS operations. The aim is to assist participating national administrations, the EC and EMSA to enable the effective implementation of EC Direc-
tive 2010/65/EU (Reporting Formalities for Ships arriving in/departing from EU ports) in time. ANNA also supports (system) integration of national maritime single window development (ship-to-shore and between the various services/administra-tions) to allow for effective and sustainable communication between the national systems, including SafeSeaNet (SSN). The ANNA consortium consists of 13 EU Member States and is supported by nine countries, the World Customs Organisation and eight stakeholder organisations.
2012-EU-21019-S • Part of Priority Project 21
ANNA - Advanced National Networks for Administrations
MoSMember States involved:Belgium, Bulgaria, France, Greece, Italy, Latvia, Portugal, Romania, Slovenia, Spain, Sweden, The Netherlands, United Kingdom
Applicant:Dutch Ministry of Infrastructure and the Environment
Requested fundingTotal eligible costs €37,076,437
TEN-T requested funding: €18,538,219
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €37,076,000
TEN-T recommended funding: €18,538,000
TEN-T funding: 50%
Evaluation remarks
68
TheproposedActionishighlyrelevanttothecallforproposalsasapilotactionovercomingICTobstaclesinprovidingseamlesstransportoperationsinthemultimodalsupplychain,includingITsolutionsfortheimplementationoftheEUDirective2010/65.TheproposedActionisverymatureandbuildsontheexperienceandusefulresultsofpreviouslyMoS4MosAction.Itsimpactisgood.ThequalityoftheproposedActionisgood.
The B2MoS Action is an innovative study/pilot actions aiming at improving the information exchange between public and private organisations and promoting their operational cooperation to increase the efficiency of MoS. It hopes to boost the
development of a TEN-T Motorways of the Sea network and improve European cohesion by simplifying specific administrative procedures affecting ultra-peripheral and peripheral regions and reducing barriers to intra-EU trade.
The project will contribute to establishing a European maritime space without barriers by facilitating and simplifying compliance with regulations and by promoting intermodal sustainable transport solutions that reinforce the MoS strategy. The prototypes will be piloted by public entities, port communities and MoS business stakeholders offering road, rail, inland navigation and maritime services in MoS services connecting Germany, United Kingdom, Spain, Italy, Slovenia and Greece.
2012-EU-21020-S • Part of Priority Project 21
Business to Motorways of the Sea
MoSMember States involved:Germany, Greece, Italy, Slovenia, Spain, United Kingdom
Applicant:Fundacion de la Comunidad Valenciana para la In-vestigacion, Promocion y Estudios Comerciales de Valenciaport
Requested fundingTotal eligible costs €11,394,970
TEN-T requested funding: €5,697,485
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €11,394,000
TEN-T recommended funding: €5,697,000
TEN-T funding: 50%
Evaluation remarks
69
TheproposedActionisrelevanttothecallforproposalsintermsofintegrationoftheconceptinawidercorridorframe-workofthenewTEN-Tguidelines.Itisverymatureandreadytostart.IthasapositiveimpactasfarasitscontributiontothedecisionandpolicymakingatEUlevelinrelationtotheindividualproposedcorridors.Itsqualityisgood.
In the new TEN-T Guidelines, Motorways of the Sea remain the maritime dimension of the TEN-T network. By improving maritime, ports and logistics operations, MoS will allow the development of the underlying skeleton of the new multimodal
core network corridors. As an operative and policy supporting framework, WiderMos will improve the interoperability between maritime/other transport modes (mainly rail) by developing new port/ship/train interfaces and will help kick off the analysis of how MoS will be linked to the governance model of the TEN-T priority corridors. This will be realised through:
•Fivepilotprojects,demonstratingtheeffectivenessofabetterstructuredinteroperabilitybetweenmodes•Apolicysupportingactivitydefiningthemedium-termprospectiveoptionsforMoSin2020•AdeeperanalysisoffourveryspecifictopicsconcerningtheroleofMoSinthedevelopmentoftheTEN-Tcorridorsgov-ernancemodel
WiderMoS
2012-EU-21021-S • Part of Priority Project 21
MoSMember States involved:Germany, Italy, Portugal, Spain
Applicant:Autorità Portuale della Spezia
Requested fundingTotal eligible costs €5,940,398
TEN-T requested funding: €2,970,199
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €5,940,000
TEN-T recommended funding: €2,970,000
TEN-T funding: 50%
Evaluation remarks
70
TheproposedActionisveryrelevanttothecallforproposalsandaimsatdeployinganewpropulsionsystemforves-sels.Thematurityhasbeenwelldemonstrated. Itwillhaveusefulenvironmental impact for theNorthernSulphurEmissionControlArea.Ithasanoverallgoodquality.
The project, a pilot Action, aims at optimizing bunker consumption and reduction of exhaust gas emissions, through the use of an innovative system of ESS batteries (Energy Storage System) for hybrid propulsion and the installation of
wet-scrubber technology on four similar ro/pax ships, serving the high frequency maritime route between the Ports of Puttgarden (DE) and Rødby (DK). The Action will be implemented by a consortium composed of two branches of the same holding company (Scandlines).
2012-EU-21023-S • Part of Priority Project 21
Sustainable Traffic Machines - On the way to greener shipping
MoSMember States involved:Denmark, Germany
Applicant:Scandlines Deutschland GmbH
Requested fundingTotal eligible costs €25,303,950
TEN-T requested funding: €12,651,975
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €12,917,000
TEN-T recommended funding: €6,458,000
TEN-T funding: 50%
Evaluation remarks
72
The Action is very relevant to the call for proposals as it aims to upgrade RIS technology, systems and serviceapplications.TheActionisverymatureandwillleadtopositiveoutcomeintermsofimprovingtheeconomicefficiencyandsafetyofinlandnavigation.ThequalityoftheproposedActionisexcellent.
ThisActionfollowsfromthreepreviousRISTEN-Tfundedprojects(2008-BE-30000-P,2010-BE-70202,2011-BE-70001)andaimstoextendtherangeofavailableRISservicesandapplicationsinFlanders.ItfocusesontheconnectionofRIS
applicationstothe‘backbonestructure’ofRISFlandersdevelopedpreviously,aswellasmakingRISinformationavailabletoawiderpublic.TheobjectiveistoprovideFlanderswithamorerobustandup-to-dateRISsystemandshareinformationwithotherinterestedstakeholderssuchaslogistics,safetyandsecurityoperators.
2012-BE-70001-P
Implementation of RIS in Flanders IV
RISMember States involved:Belgium
Applicant:Flemish Government
Requested funding
Total eligible costs €2,940,000
TEN-T requested funding: €588,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €2,940,000
TEN-T recommended funding: €588,000
TEN-T funding: 20%
Evaluation remarks
73
TheproposedActionishighlyrelevanttothecallforproposalsasitaimsatfurtherimprovingtheriverinformationservicesavailableinaverybusyarea.TheproposedActionismatureandreadytostart.Itisexpectedtohaveapositiveimpactintermsofimprovedsafety,reliabilityandefficiencyofnavigation.OveralltheproposedAction’squalityisgood.
ThisActionisthethirdphaseofexistingRISTEN-Tfundedprojects(2008-EU-30001-Pand2011-EU-70003-P),aimingatenhancingthesafetyandefficiencyofinlandwaterwaytransportontheWesterscheldtriver—namelyimprovingthe
exchange of information, replacing the backbone of the information processing system of the Scheldt Radar Network,enablingtheuseofmoderncommunicationtools(RISapplicationsforsmartphones,tablets,applications),implementingthecalamityabatementsupportandimprovingoperationalplanningontheGent-TerneuzenCanal.
2012-EU-70002-P
Implementation of RIS on the Westerscheldt River III
RISMember States involved:Belgium, The Netherlands
Applicant:Flemish Government
Requested funding
Total eligible costs €2,375,000
TEN-T requested funding: €475,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €2,375,000
TEN-T recommended funding: €475,000
TEN-T funding: 20%
Evaluation remarks
74
TheproposedActionisextremelyrelevanttothecallforproposalsasitaimstofacilitatethedefinitionandimplemen-tationofaRIScorridorapproachandstrengthenthepositionofinlandnavigationinthemulti-modaltransportchain.Itismature.TheoveralimpactisverypositiveandtheproposedActionwillserveasausefuldecision-makingandpolicytoolforcorridormanagementattheEuropeanlevel.Thequalityisgood.
ThisstudyaimsatdevelopingthedefinitionandimplementationofaRIScorridorapproachtostrengtheninlandnavigationwithinthetransportchain.TheActionwillfacilitatetheestablishmentofastructureddialoguebetweenpublicandprivate
stakeholdersacrossnationalborders.Inaddition,itwillinvestigatehowtofosterinteroperabilityandcompatibilitybetweentheseveraltechnologiesdeployed.Theproject’sactivitiesinthecontextoftheGlobalProjectwillfocusonthedeploymentofintelligentinfrastructuretoenabletheefficientRISimplementationatcorridorlevel.
2012-EU-70004-S
RIS Enabled European IWT Corridor Management
RISMember States involved:The Netherlands, Austria, Belgium, Germany, Luxembourg
Applicant:Ministerie van Infrastructuur en Milieu
Requested funding
Total eligible costs €2,814,000
TEN-T requested funding: €1,407,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €2,814,000
TEN-T recommended funding: €1,407,000
TEN-T funding: 50%
Evaluation remarks
75
TheproposedActionishighlyrelevanttothecallforproposalsasitaimstodevelopariverinformationsystemadaptedtotheneedsoftheareaconcerned.Itismature.Itwillcontributetoincreasingthequalityandsafetyofnavigationintheregion.Thequalityisgenerallygood.
TheActionaimsatdevelopingariverinformationsystemadaptedtotheneedsoftheUpperRhineinFrance.Themainobjectiveofthisstudyistobuildontheoutputsdeliveredwithintheframeworkofpreviousprojectsandtoplananinland
waterwaytrafficmanagementsystemfortheUpperRhine.TheActionwillfirstidentifyuserneedsandthenimplementadataexchangesystem.Theprojectaimstoincreasewaterwaytransportcompetitiveness,reinforcesafety,upgradetrafficmanagementandreduceCO2emissions,aswellasplayanimportantroleinfosteringmodalshift.
2012-FR-70003-S
RIS Upper Rhine
RISMember States involved:France
Applicant:Ministère de l’écologie, du Développement durable et de l’énergie
Requested funding
Total eligible costs €1,936,200
TEN-T requested funding: €968,100
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €1,936,000
TEN-T recommended funding: €968,000
TEN-T funding: 50%
Evaluation remarks
77
TheproposedActionisofhighrelevancesinceitaddressestheobjectivesandprioritiesoftheCallforProposalsnamelyitispartofPriorityProject17andisexpectedtoremoveacapacitybottleneck.TheActionhasreceivedallapprovalsnecessarytocommencetheimplementation;itisthereforeverymature.Itssocio-economicimpactishighasitwillestablishacompetitivetrans-Europeannetwork,providinghighqualityoffreightandpassengerservice.Theproposalisofverygoodquality.
The proposed construction of the St Pölten freight train bypass complements previous measures to complete the Global Project (Priority Project 17) on the Munich-Bratislava sub-section. It aims to remove an identified bottleneck by increasing
the capacity to four tracks, together with the high speed passenger line through St Pölten. To achieve the scheduled operation of the bypass by 2017, two works are still needed: Pummersdorfer tunnel and the western connection.
This Action involves the construction of the connection to the west of the new St Pölten freight train bypass and works to connect the Rohr and Wagram nodes.
2012-AT-17002-P • Part of Priority Project 17
St Pölten freight train bypass, connection to the west
PPs - New ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested funding
Total eligible costs €66,391,360
TEN-T requested funding: €13,278,272
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €66,385,000
TEN-T recommended funding: €13,277,000
TEN-T funding: 20%
Evaluation remarks
78
TheproposedActionisofhighrelevancetothecallforproposalssinceitaddressestheremovalofabottleneckonPriorityProject17.TheActionisverymatureasithasreceivedallapprovalsnecessarytocommencetheimplemen-tation.Anex-anteevaluationhasdemonstratedthattheproposedActionwillhavepositivedirectandindirectsocio-economiceffects.Thequalityoftheproposalisverygoodincludingwellthoughtimplementationplans.
The newly to be constructed St. Pölten freight train bypass continues previous measures to complete the Global Project (Priority Project 17) on the Munich-Bratislava sub-section. It aims to remove an identified bottleneck by increasing the
capacity to four tracks, together with the high speed passenger line through St. Pölten. To achieve the scheduled operation of the bypass by 2017, two works are still needed: Pummersdorfer tunnel and the Western connection.
This Action involves the construction of Pummersdorfer tunnel, including the shell construction tunnel, tunnel equipment and non-ballasted track.
2012-AT-17003-P • Part of Priority Project 17
Pummersdorfer Tunnel
PPs - New ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested funding
Total eligible costs €66,982,000
TEN-T requested funding: €13,396,400
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €66,975,000
TEN-T recommended funding: €13,395,000
TEN-T funding: 20%
Evaluation remarks
79
TheproposedActionishighlyrelevanttothecallforproposalsasitaddressesamajorbottleneckonPriorityProject18.TheActionisverymatureasimplementationhasalreadystarted.Itwillgenerateconsiderablesocio-economicbenefitsintermsofimprovedmodalsplitandgrowthofcontainertranshipment.Thequalityoftheproposalisverygood.
TheproposedActionconsistsofworksaimingtoexpandthetrimodalportofFreudenau/Vienna,inordertoincreasetheca-pacityforhandlingadditionalfreight–especiallyinthelightofrecentincreasesofthroughput.Theportisanintersection
forinternationalflowsandtranshipmentbetweeninlandwaterway,railandroadtransport.Theseworksspecificallyconcerntheextensionoftheport’scontainerhandlingcapacitiesthroughlandrecoveryandtheconstructionofanewquaywallinordertooptimisetheareasofoperation.
2012-AT-18070-P • Part of Priority Project 18
Expansion of the tri-modal inland port by land recovery
PPs - New ActionMember States involved:Austria
Applicant:Wiener Hafen, Gmbh & Co KG
Requested funding
Total eligible costs €12,797,477
TEN-T requested funding: €2,559,495.40
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €12,790,000
TEN-T recommended funding: €2,558,000
TEN-T funding: 20%
Evaluation remarks
80
TheproposedActionishighlyrelevanttothecallforproposalsasitaddressesbottlenecksonPriorityProject28withaviewtoimprovingtheconnectiontotheairport.TheActionisverymatureandreadytostartaspreparatorystepshavebeencompleted.Itsimpactiswelldemonstrated.Thequalityoftheproposalishighascompleteandaccurateinformationisprovided.
The Action covers the works at Watermael-Schuman-Josaphat for the period 2012-2015 to eliminate the bottlenecks of Brussels-Schuman-Schaerbeek and the Etterbeek triangle on Priority Project 28 (Eurocaprail on the Brussels-Luxembourg-
Strasbourg railway axis). It will also allow the connection between Priority Project 28 and the new railway infrastructure for Brussels Airport linking Priority Project 28 to Priority Project 2, High-speed railway axis Paris-Bruxelles/Brussel-Köln-Amster-dam-London. The works comprise:
•CivilengineeringworksoftheSchuman-JosaphattunnelanditsconnectiontotheexistingCinquantenairetunnel•AdaptationoftherailwaybaseandsafetymeasuresfortheSchuman-Josaphatlink,includingbuildingadditionalemer-gencyexits
•Extensionworks,finishingandsafetymeasuresfortheSchumanmultimodalhub•ConstructionworkattheL.161crosswithL.161A-trackB(flyover)andrailwayequipmentoftheL.161betweentheWa-termaelandEtterbeekstations
•Installationofenvironmentalmeasures(acousticscreens,anti-vibrationmeasures)
2012-BE-28105-P • Part of Priority Project 28
Watermael Schuman-Josaphat
PPs - New ActionMember States involved:Belgium
Applicant:Infrabel sa
Requested funding
Total eligible costs €194,471,239.18
TEN-T requested funding: €38,894,247.84
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €169,720,000
TEN-T recommended funding: €33,944,000
TEN-T funding: 20%
Evaluation remarks
81
TheproposedActionisveryrelevanttothecallforproposalsasitcontributestoimprovingthemultimodalcapacity.TheActionisverymatureandreadytostartfromthetechnicalpointofview.TheimpactsoftheActionareverypositive.ThequalityoftheproposalisgoodandtheproposedactivitiesarecoherentwiththeobjectiveoftheAction.
TheMělníkinlandportservesdailycontainertrainsfrom/toWesternEuropeanportssuchasRotterdam,BremerhavenandHamburg;aswellasBratislava,BudapestandKoper.TherearebottlenecksinthetransfercapacityinCentralBohemia
andMelnikistheonlyCzechportwiththepotentialforexpansion.TheAction,whichisonPriority Project 22(RailwayaxisAthens-Sofia-Budapest-Wien-Praha-Nürnberg/Dresden)nexttotheElberiveraimstoeliminatebottlenecksandcompletethemainroutesinordertoachieveinteroperabilityoftherailnetwork.
Italsoaimstooptimisethecapacityandefficiencyoftheinfrastructure,sincethethepresentfacilitiesareoutdatedandcannotmatchthecargovolumedevelopment.Specifically,theActionwillincreaserailcapacity,storage,transfercapacityto200,000TEU,andexpandentranceandpositioningareafortrucks.
2012-CZ-22117-P • Part of Priority Project 22
Intermodal terminal Mělník
PPs - New ActionMember States involved:Czech Republic
Applicant:České přístavy, a.s.
Requested funding
Total eligible costs €4,134,648
TEN-T requested funding: €826,929.60
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €4,130,000
TEN-T recommended funding: €826,000
TEN-T funding: 20%
Evaluation remarks
82
The proposed Action is highly relevant to the TEN-T priorities and call for proposals as it will improve modalintegration, will foster sustainable mobility and will facilitate intermodality between Priority Project 17and the Munich airport. The maturity of the proposed Action is very good and there are no pending issuesbefore theAction starts. TheActionwill producesocio-economicbenefits,will improve intermodalityalongPriorityProject17andcontributetomodalshiftfromroadtorailthusreducingCO2emissions.Thequalityoftheproposalisgood.
The proposed Action includes studies and planning to obtain the building permit for the construction of a new railway con-nection from the Munich Airport towards the east (direction of Erding), and farther to Priority Project 17 (Railway axis
Paris-Strasbourg-Stuttgart-Wien-Bratislava).
The objective is to carry out planning phases 1-4 to get the building permits according to the HOAI (German Scale of Fees for Architects and Engineers) for the following sections:
•MunichAirport-Erding•Erding-Walpertskirchen(Walpertskirchener Spange)-componentservices(planning,projectsteeringandaccompanimentbyDBNetzAG,DBStation&Service,DBEnergie,DBProjektbau)
2012-DE-17022-S • Part of Priority Project 17
Planning the construction of a new rail-way connection between Munich Airport and PP17 between Munich and Salzburg
PPs - New ActionMember States involved:Germany
Applicant:Bayerisches Staatsministerium für Wirtschaft, Infrastruktur, Verkehr und Technologie
Requested funding
Total eligible costs €25,000,000
TEN-T requested funding: €12,500,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €25,000,000
TEN-T recommended funding: €12,500,000
TEN-T funding: 50%
Evaluation remarks
83
TheproposedActionishighlyrelevanttothecallforproposalsandTEN-TprioritiesasitaimsatimprovingoperationsonPriorityProject20,establishingkeylinksandinterconnectionsaswellaseliminatingbottlenecks.Itsmaturityisverygoodaskeypreparatorystepshavebeenfulfilled.TheimpactoftheproposedActionisverygood.Thequalityoftheproposalisverygoodincludingcleardescriptionsoftheexpectedresults.
TheproposedActionisastudyforthepreliminaryandfinaldesignphasesfortheconstructionofanewtrackbetweenHamburgandBadOldesloeparalleltotheexistingtrack,includingthepreparationofthenecessaryconstructionpermis-
sionapplications.
The proposed Action covers the southern part of the German access to the Fehmarn Belt Fixed Link and forms part of Priority Project 20.
2012-DE-20012-S • Part of Priority Project 20
Fehmarn Belt-Hinterland Connection: planned activity for unbundling rail traffic at
the Hamburg junction (TEN-T Priority Project 20)
PPs - New ActionMember States involved:Germany
Applicant:Freie und Hansestadt Hamburg, Behörde für Wirtschaft, Verkehr und Innovation
Requested funding
Total eligible costs €29,200,000
TEN-T requested funding: €14,600,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €29,200,000
TEN-T recommended funding: €14,600,000
TEN-T funding: 50%
Evaluation remarks
84
TheproposedActionishighlyrelevanttothecallforproposalsasitaddressesabottleneckonPriorityProject20.Itsmaturityisdemonstratedbythenecessarypoliticalandfinancialcommitments.TheActionisexpectedtoproduceasignificantimpactonlocalplanningandontheGlobalProjectthatwillboosttheeconomyoftheBalticsearegion.Thequalityoftheproposalisverygood.
TheActionconsistsofdetailedplanningphasestudiesofanewhighspeedrailwaybetweenCopenhagenandRingsted,avitalpartofPriorityProject20(RailwayaxisFehmarnBelt)inDenmark.TheexistingmainlinethatrunsfromCopenhagen
toRingstedviaRoskildeisoneofDenmark’smostheavilyusedandstrategicallyimportantroutes.ItisusedbycommutersbetweenCopenhagenandtherestofZealand,aswellasfornationalandinternationalpassengerandfreighttraffic.Theex-istinglineviaRoskildehasbecomeabottleneck.Itwasdecidedin2012thatthebesttechnicalsolutionwasanewdualtracklinefromCopenhagentoRingstedviaKøge,includinganewstationinthenorthernpartofKøge(KøgeNord)andamaximumspeedforpassengertrainsof250km/h.
2012-DK-20010-S • Part of Priority Project 20
New railway line Copenhagen-Ringsted (detailed planning phase): access lines to the future Fehmarn Belt fixed link
PPs - New ActionMember States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested funding
Total eligible costs €61,168,000
TEN-T requested funding: €30,584,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €61,168,000
TEN-T recommended funding: €30,584,000
TEN-T funding: 50%
Evaluation remarks
85
The proposed Action is highly relevant to the call for proposals as it contributes to removing a bottleneck onPriorityProject20.ItsmaturityisexcellentandtheActionisreadytostartasallnecessarypreparatorystepshavebeenfulfilled.ItsimpactisverygoodastheActionisexpectedtofurtherdevelopbestpracticesonintegratingenvironmentalconcernsandclimateadaptationmeasures.Theproposalisofveryhighquality,realisticandconsistent.
TheAction consists of studies for the detailed design phase for the construction the FehmarnBelt railway hinterlandconnectionsinDenmarktoincreasethecapacityoftherailwaysectionbetweenRingstedandRødby.TheActionincludes
projectmanagement,detaileddesignfortheconstructionworks,aswellasitstenderingandawarding.
2012-DK-20013-S • Part of Priority Project 20
Upgrade of the Ringsted-Rødby section (second phase of detailed planning studies): upgrading the railway access lines to the future Fehmarn
Belt fixed link
PPs - New ActionMember States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested funding
Total eligible costs €39,441,586
TEN-T requested funding: €19,720,793
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €39,440,000
TEN-T recommended funding: €19,720,000
TEN-T funding: 50%
Evaluation remarks
86
TheproposedActionishighlyrelevanttothecallforproposalsandtheTEN-TprioritiesasitaddressesabottleneckandcontributestothedevelopmentofinteroperabilityalongPriorityProject27.TheActionisverymatureasitistechni-callyreadytostart.TheproposedActionwillproduceapositiveimpactonthedevelopmentofPriorityProject27.Theproposalisofgoodquality.
TheproposedactionispartoftheGlobalProjectdevelopingtheEuropeangaugerailwaylineinEstoniaaspartofPriorityProject27(“RailBaltica”-Warsaw-Kaunas-Riga-Tallinn-Helsinki).TheActionincludespreparatorystudiescoveringthespatial
planning,preliminarydesignandupdatedfinancialstudiestoachievesufficientmaturitytobeginthedetailedtechnicaldesignandworksprocurement.
2012-EE-27001-S • Part of Priority Project 27
Spatial planning and technical studies for Rail Baltica (Estonian section)
PPs - New ActionMember States involved:Estonia
Applicant:Estonian Technical Surveillance Authority
Requested funding
Total eligible costs €10,257,400
TEN-T requested funding: €5,128,700
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €10,256,000
TEN-T recommended funding: €5,128,000
TEN-T funding: 50%
Evaluation remarks
87
TheproposedActionisrelevanttothecallforproposalsandtheTEN-Tprioritiesasitconcernsthedevelopmentofinterconnections, improvementofsafetyandmobility. Itsmaturity isgoodasallnecessarypreparatorystepshavebeenorareabouttobefulfilled.TheActionisexpectedtoproduceaverygoodimpactonimprovingsafetyandreducingtheroadtrafficload.Thequalityoftheproposalisgood,includingrealisticimplementationplans.
The Action concerns the elaboration of the remaining studies for upgrading the Piraeus-Athens section. Specifi-cally, the Action includes the following studies: surveying, preliminary and final studies, detailed (E/M, architectural
landscape), geotechnical, superstructure, Environmental Impact Study modification (if required), planting works and theelaborationoftenderdocuments.
2012-EL-22023-S • Part of Priority Project 22
Remaining studies for the underground con-struction and rail level realignment of the
railway corridor from the Piraeus RS exit (Km 1+488) to the Athens RS entrance (Km 9+700)
PPs - New ActionMember States involved:Greece
Applicant:ΥΠΟΥΡΓΕΙΟ ΑΝΑΠΤΥΞΗΣ, ΑΝΤΑΓΩΝΙΣΤΙΚΟΤΗΤΑΣ, ΥΠΟΔΟΜΩΝ, ΜΕΤΑΦΟΡΩΝ & ΔΙΚΤΥΩΝ
Requested funding
Total eligible costs €1,500,000
TEN-T requested funding: €750,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €1,500,000
TEN-T recommended funding: €750,000
TEN-T funding: 50%
Evaluation remarks
88
TheproposedAcitonishighlyrelevanttothecallforproposalsasitaimsatimprovinginteroperabilityandaccessibilityaswellasremovingbottlenecksonPriorityProject3.ItsmaturityisdemonstratedastheActionhasalreadystarted.Itsimpactisimportantintermsoffurtherdecisionmakingconcerningtheglobalproject.Thequalityoftheproposalisgood.
TheGlobalProjectconsistsoftheconnectionofthe internationaltrackwidthfromthePortofBarcelonatotheFrenchborderaspartofthehighspeedMadrid-Barcelona-Frenchborderrailline,withinPriorityProject3(Highspeedrailway
axisofsouthwestEurope).TheproposedActioncoversastudyonthenewsouthernroadandrailwayaccesstothePortofBarcelonaandinparticularitsnewPratdock,includingtheTercat-Hutchisoncontainerterminal.
2012-ES-03040-S • Part of Priority Project 3
New southern road and rail access to the Port of Barcelona. Phase 1. Studies.
PPs - New ActionMember States involved:Spain
Applicant:Ministerio de Fomento. Dirección General de Ferrocarriles
Requested funding
Total eligible costs €1,580,400
TEN-T requested funding: €790,200
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €1,580,000
TEN-T recommended funding: €790,000
TEN-T funding: 50%
Evaluation remarks
89
TheproposedActionisveryrelevanttothecallforproposalsasitconcernstheremovalofabottleneckalongPrior-ityProject8.ItsmaturityisverygoodasallprerequisiteshavebeenfulfilledandtheActionisreadytostart.AspartoftheGlobalProject,theActionisexpectedtohaveapositiveimpactonabsorbingtrafficgrowth,increasingnationalcompetitionandsafety.Thequalityoftheproposalisgood,realisticandconsistentfromthetechnicalandfinancialpointofview.
Theproposalconsistsofworksfortheimplementationof25kVelectrification,energyfacilitiesandservicestofollowuptheworksonthe71kmlongMedinadelCampo-Salamancasection,belongingtotheSalamanca-Portugueseborder-Lisbon
conventionalrailwayline,partofPriorityProject8(MultimodalaxisPortugal/Spain-restofEurope).
2012-ES-08113-P • Part of Priority Project 8
Electrical facilities for Medina del Campo-Salamanca section. Railway line Medina del Campo-Salamanca-Fuentes de Oñoro
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested funding
Total eligible costs €28,370,000
TEN-T requested funding: €5,674,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €28,370,000
TEN-T recommended funding: €5,674,000
TEN-T funding: 20%
Evaluation remarks
90
TheproposedAction is relevant to the call forproposalsand theTEN-Tprioritiesas it aimsat improvingexistingcapacityandpromotinginter-modality.Itismatureandreadytostartfromthetechnicalpointofview.Positiveimpactisexpectedonabsorptionoftrafficgrowth,multi-modalsplit,servicequality,safetyandsecurity.Theoverallproposalisofgoodquality,realisticandconsistentfromatechnicalpointofview.
Theproposalconsistsoftrackbedworks,signallingandtelecommunicationsfacilitiesinthesectionPk3,1toPk6,8SanRoqueMercancíasbelongingtotheconventionalBobadilla-Algecirasline,partofPriorityProject16(FreightrailwayaxisSines/
Algeciras-Madrid-Paris).Theworksincludeinter aliathecompleterenovationoftheexistingIberiangaugesingletrackbylay-ingdownpolyvalentsleepers;installationofaCentralisedTrafficControl(CTC)system,constructionofsmallvariantsandrailsidetrack,curvecorrectionsandembankmentstabilisation,reductionofthenumberoflevelcrossingsandthepowersupplytoequipmentandfacilities.
2012-ES-16096-P • Part of Priority Project 16
Track bed works, signalling and telecomuni-cation facilities: Section Pk 3,1 a Pk 6,8. San
Roque Mercancías. Railway line Bobadilla-Algeciras
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested funding
Total eligible costs €14,000,000
TEN-T requested funding: €2,800,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €14,000,000
TEN-T recommended funding: €2,800,000
TEN-T funding: 20%
Evaluation remarks
91
The proposed Action is highly relevant to the call for proposals as it concerns design studies leading to theimplementationofworksonPriorityProject19.Itsmaturityisverygoodasnecessarysupporthasbeenprovidedandallpreparatorystepshavebeenfulfilled.Theimpactishighastheoutcomeofthestudywillbethebasisforphysicalimplementationtostart.Theproposalisofgoodquality.
TheproposalconcernstheplanningandthefinaldesignstudiesfortheimplementationofUICgaugeinthe570kmlongrailsectionbetweentheCastellbisbalHubandMurcia,alongtheMediterraneancorridor,partofPriorityProject19(Highspeed
railinteroperabilityintheIberianPeninsula).Thesectionisplannedwith340kmofdoubletrackand230kmofsingletrack.
2012-ES-19031-S • Part of Priority Project 19
Implementation of the UIC gauge in the Mediterranean Corridor. Phase 1.
Studies.
PPs - New ActionMember States involved:Spain
Applicant:Ministerio de Fomento. Dirección General de Ferrocarriles
Requested funding
Total eligible costs €9,754,900
TEN-T requested funding: €4,877,450
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €9,754,000
TEN-T recommended funding: €4,877,000
TEN-T funding: 50%
Evaluation remarks
92
TheproposedAction ishighlyrelevanttothecallforproposalsas itconcernsdesignstudies leadingtothe imple-mentationofworksonPriorityProject19.Itsmaturityisverygoodasnecessarysupporthasbeenporvidedandallpreparatorystepshavebeenfulfilled. Its impact ishighastheoutcomeofthestudywillbethebasisforphysicalimplementationtostart.Theproposalisofgoodquality.
TheproposalconcernsworksfortheimplementationofUICgaugeintherailsectionbetweenCastellbisbalandNuddeVilas-eca,alongtheMediterraneancorridor,partofPriorityProject19(HighspeedrailinteroperabilityintheIberianPeninsula).In
particular,itincludesthenecessaryadaptationsontheinstallationsandlineelementsfortheoperationof750mlongtrainsinmixedgauge.Theworkswillbecarriedoutalong90kmofdoubletrackand7kmofsingletrack,allowingtheaccesstothePortofTarragonainUICgauge.
2012-ES-19041-P • Part of Priority Project 19
Implementation of the UIC gauge in the Mediterranean Corridor. Section Castell-
bisbal-Nudo de Vilaseca. Phase 1.
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested funding
Total eligible costs €340,859,700
TEN-T requested funding: €68,171,940
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €340,855,000
TEN-T recommended funding: €68,171,000
TEN-T funding: 20%
Evaluation remarks
93
TheproposedActionishighlyrelevanttothecallforproposalsandTEN-Tprioritiesasitisakeysteptotheimplemen-tationofanimportantcrossbordersectiononPriorityProject1.TheActionisverymaturesincetechnicallytheprojectisreadytostart.TheimpactoftheActionisexpectedtobeverygood.Thequalityoftheproposalisgoodincludingsoundorganisationalstructureandprojectmanagementplan.
Thisproject,partofPriorityProject1(RailwayaxisBerlin-Verona/Milan-Bologna-Naples-Messina-Palermo),involvesapre-studyforthelinerouteingofthenorthernaccesslinetotheBrennerBaseTunnelbetweenMunich(Germany)andRadfeld
(Austria)—asectionidentifiedasaPriorityProject1bottleneckthatneedstobeurgentlyremoved.
2012-EU-01092-S • Part of Priority Project 1
PP1 Global Project Munich–Kufstein, Kufstein–Inns-bruck, Brenner Base Tunnel (cross-border) and Fortez-za–Verona: Pre-study for the Northern access line to the Brenner Base Tunnel between Munich (Germany)
and Radfeld (Austria)
PPs - New ActionMember States involved:Germany, Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested funding
Total eligible costs €6,715,000
TEN-T requested funding: €3,357,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €6,714,000
TEN-T recommended funding: €3,357,000
TEN-T funding: 50%
Evaluation remarks
94
TheproposedActionishighlyrelevanttothecallofproposalsandTEN-Tprioritiesasitaddressesakeycross-borderbottleneckonPriorityProject1andwillleadtotheconstructionoftheBrennerBaseTunnel.Itsmaturityisexcellentbecausetheactivitiesarealreadyongoing.TheimpactisalsoexcellentastheoutputoftheActionwilldeterminecriti-caldecisionmakingaspectsfortheimplementationphaseoftheGlobalProject.Thequalityoftheproposalisoverallverygoodwithwelldescribedandcoherentactivities.
TheActionispartoftheGlobalProjectfortheconstructionoftheBrennerBaseTunnel,thecentrepieceofPriorityProject1(Rail-wayaxisBerlin-Verona/Milan-Bologna-Naples-Messina-Palermo).Itinvolvestheplanningandexcavationofanexploratory
tunnelbetweenthefuturemaintubes,whichalreadyreceivesTEN-Tfunding.Additionalfundsarerequestedtocontinuetheactivitiesthroughout2014and2015,whicharecomprisedof:
•Planning,preparationoftenders,diagnosticandexplorationprobes,monitoringandcompensatorymeasures•Tunnelstability/safetymonitoringandmanagingsystemandcontrolcentre•Accesses,exploratorytunnelsandaccompanyingstructuresandfacilities•Technicalsupportmeasuresandfacilitiesinordertopreparetheconstructionofthetunnelsandmultipurposeareas•Disposalsitesandaccompanyingstructuresandfacilities
2012-EU-01098-S • Part of Priority Project 1
Priority Project 1: Brenner Base Tunnel - studies
PPs - New ActionMember States involved:Italy, Austria
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested funding
Total eligible costs €171,300,000
TEN-T requested funding: €85,650,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €171,300,000
TEN-T recommended funding: €85,650,000
TEN-T funding: 50%
Evaluation remarks
95
TheproposedActionisrelevanttothecallforproposals.TheActionhasdemonstrateditsmaturityasitistechnicallyreadytostart. It isexpectedtohavepositive impactsboth intermsofpolicy-makinganddecision-makingtools inconnectionwiththeintroductionofnewcleantechnologiesalongPriorityProjects13and26andpossiblyinotherEUmemberStates.Thequalityoftheproposalisgood.
ThisActionwillstudythebusinessfeasibilityandcustomerconvenienceofmulti-standardelectricvehiclerapidchargingstations,withassociateddeploymentalongthefulllengthofPriorityProjects13(RoadaxisUnitedKingdom/Ireland/Ben-
elux)and26(Railway/roadaxisIreland/UnitedKingdom/continentalEurope)throughtheUKandIreland.Thisisasubstantialreal-worldtrialof74rapidchargingstationscoveringover1,100kmalongmajorUKandIrishroadnetworkroutes.Thepilotalsolinkswithfivemajorseaportsandfiveinternationalairports,thuspromotingmultimodaltransportsolutionsbylinkingroaduserstoseaandairtransportmodes.
2012-EU-13066-S • Part of Priority Project 13
Accelerating the introduction of electric vehicle rapid charging by studying adoption
and use along PPs 13 and 26 in the UK and Ireland
PPs - New ActionMember States involved:United Kingdom, Ireland
Applicant:Nissan Motor (GB) Ltd
Requested funding
Total eligible costs €7,359,778
TEN-T requested funding: €3,679,888
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €7,358,000
TEN-T recommended funding: €3,679,000
TEN-T funding: 50%
Evaluation remarks
96
TheproposedActionisveryrelevanttothecallforproposalsasitaimsatdeveloppingLNGasalternativefuelforinlandwaterwaytransport.ThematurityoftheActionisgood.ItisexpectedtohaveasignificantimpactontheLNGintroductionontheaxisRhine-Main-Danube.Thequalityoftheproposalisgood.
Theaction,whichaddressesPriorityProject18(WaterwayaxisRhine/Meuse-Main-Danube)willprovideaEuropeanstrategyandpilotdeploymentsbothforLNGasfuelforinlandvesselsandascargotransportedonwaterwaysanddistributed
viainlandports.TheActionconsistsofasetoffeasibilitystudies,technicalconcepts,technicaltrialsandpilotdeploymentsofvesselsandterminals.Itisamulti-partnerapplicationof33companiesandorganisationsfrom12EUMemberStates.Itaimstoprovideaplatformforkeypublicandprivatestakeholders,facilitatingparalleldevelopmentofthenecessaryregula-toryframeworkforLNGasvesselfuelandcargo.Itwillalsodeliverinitialdeploymentinterminalandvesselinfrastructure.
2012-EU-18067-S • Part of Priority Project 18
LNG Masterplan for Rhine-Main-Danube
PPs - New ActionMember States involved:Germany, Austria, Belgium, Bulgaria, Cyprus, Czech Republic, France, Italy, Luxembourg, The Nether-lands, Romania, Slovakia
Applicant:Pro Danube Management GmbH
Requested funding
Total eligible costs €121,316,983.44
TEN-T requested funding: €60,658,492.72
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €80,520,000
TEN-T recommended funding: €40,260,000
TEN-T funding: 50%
Evaluation remarks
97
ThemostsignificantpartoftheproposedActionisnotrelevanttothecallforproposals.Howevertheremainingstudypartisrelevant.ActivitiesoftheActionrelevanttothecallaretechnicallyreadytostart.Thestudywillbeusedasagooddecision-makingtoolandtechnicalbasisforcarryingouttargetedportdevelopments;thereforetheexpactedimpactisgood.Thequalityoftheproposalisgood.
TheActionconcernstheelaborationofaconcepttomodernisetheportofGiurgiu,locatedonPriorityProject18(WaterwayaxisRhine/Meuse-Main-Danube),toconnectittotheRomanianrailwaynetworkandimproveitsenvironmentalperformancein
general.Itaimsatupgradingtheexistingportterminalonthebasisofthecurrentinfrastructuretoimproveitstranshipmentservicesandenvironmentalperformance.
2012-EU-18089-S • Part of Priority Project 18
High-performance Green Port Guirgiu
PPs - New ActionMember States involved:Romania, Austria
Applicant:ILR Logistica Romania S.R.L.
Requested funding
Total eligible costs €16,872,500
TEN-T requested funding: €8,436,250
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €800,000
TEN-T recommended funding: €400,000
TEN-T funding: 50%
Evaluation remarks
98
TheproposedActionhasagoodrelevancetothecallfofproposals,astheconcernedstudieswillleadtoworkscontrib-utingtotheremovalofabottleneckalongPriorityProject3.Itsmaturityisgoodaspreparatorystepshavebeensuc-cessfullyundertaken.TheimpactoftheActionisalsogood,astheoutcomesofthestudieswillbeusedasadecisionmakingtool,aswellasbestpractices.Thequalityisdemonstratedbythefactthattheproposedactivitiesarecoherentfromthetechnicalpointofview,andthecostsarerealistic.
Located on Priority Project 3 (High-speed railway axis of southwest Europe), the proposal refers to studies on twosections:Bordeaux-Spanishborder (partofPriorityProject3)andBordeaux-Toulouse (notonthePriorityProject).The
foreseenactivitiesincludetechnicaldesignstudies,complementaryenvironmentalstudies,preparationandmanagementofthepublicinterestenquiryphase.
2012-FR-03054-S • Part of Priority Project 3
Grand Projet du Sud Ouest - Bordeaux Espagne
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested funding
Total eligible costs €11,300,000
TEN-T requested funding: €5,650,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €11,300,000
TEN-T recommended funding: €5,650,000
TEN-T funding: 50%
Evaluation remarks
99
TherelevanceoftheproposedActiontothecallforproposalsisgoodasitconcernsstudiesforthedecongestionofacomplexlink,includingsectionsonthreePriorityProjects(3,6and24).ThematurityisdemonstratedbythefactthattheActionhasalreadystarted.Averygoodimpactisexpectedintermsofdecisionandpolicy-making,aswellasgoodpractices.Thestudieswilldefinetheactionstobetakeninthenextstagesandimprovethecooperationbetweentheinvolvedstakeholders.ThequalityoftheproposedActionisgoodintermsoflogicandclarity.
LocatedonPriorityProject3 (High-speedrailwayaxisofsouthwestEurope)andonthetwoEuropeanfreightcorridorsC/2andD/6,theproposalconcernsstudiesontheLyonrailwayjunction(NFL).Theforeseenactivitiesincludestrategic
planning(timetabeplanningandmasterplanforthefixedelectrictractionfacilities),operating(technical)studies,shortandmediumterminvestmentstudiesonNFLinfrastructures,longterminvestmentstudiesandtechnicalconsultancyservicesfortheprojectowner.
2012-FR-24053-S • Part of Priority Project 24
First stage in relieving congestion at the Lyon railway junction
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested funding
Total eligible costs €19,300,000
TEN-T requested funding: €9,650,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €19,300,000
TEN-T recommended funding: €9,650,000
TEN-T funding: 50%
Evaluation remarks
100
TheproposedActionisrelevanttothecallforproposalsasitaddressesamissinglinkalongPriorityProjects9and26.Itisverymatureasithasreceivednecessarysupportandallpreparatorystepshavebeenachieved.Intermsofimpact,theproposedActionwillrepresentanimportantdecisionmakingtool.Thequalityisgood.
TheGlobalproject(theDartUndergroundProgramme)istodeliveranewundergroundrailwaylinkthroughDublinCity,alongPriorityProjects9and26.Theproposedactionconcernsthedesignstudyandplanningpermissionapprovalforthe
renewaloftherailsignallingsystemwithintheGreaterDublinArea.
2012-IE-26043-S • Part of Priority Project 26
City centre re-signalling project - Connolly Station to Sandymount
Station - design stage
PPs - New ActionMember States involved:Ireland
Applicant:Department of Transport, Tourism and Sport
Requested funding
Total eligible costs €1,449,000
TEN-T requested funding: €724,500
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €1,448,000
TEN-T recommended funding: €724,000
TEN-T funding: 50%
Evaluation remarks
101
TheproposedActionishighlyrelevantasitaimsateliminatingabottleneckalongPriorityProject6.Thematurityisexcellentastheworkshavestartedandthebudgetissecured.Ithasaveryhighimpactasitwillproduceverypositivesocio-economiceffectsintermsofcontributiontoregionalandnationalcompetitiveness,andreductionoftraveltimes.Thequalityisgood,logicalandclear.
Located on Priority Project 6 (Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border),theproposalconcernsworksonthehighspeedTreviglio–BresciarailwaylinesectionandWestBresciainterconnection.The
foreseenactivitiesincludepreparatoryworks,worksattheSerioandOglioviaducts,cuttingsandembankmentsoftheWestBresciainterconnector,worksbetweentheconcernedsectionandthenearbyMilan-Bergamo-Bresciamotorwaylinkunderconstruction,worksontheurbanentryoftheWestBresciainterconnectionandworksonBresciaCentralStation(civilworks,equipment,systemsforelectrictractionandsignaling/computerisedinterlocking).
2012-IT-06072-P • Part of Priority Project 6
High Speed/High Capacity Treviglio-Brescia section: completion of first construction lot
and adaptation of Brescia station
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested funding
Total eligible costs €729,051,789
TEN-T requested funding: €145,810,360
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €657,650,000
TEN-T recommended funding:€131,530,000
TEN-T funding: 20%
Evaluation remarks
102
TheproposedActionisrelevanttothecallforproposalsasitaddressesPriorityProject10.Itsmaturityisgood.Theimpactisexpectedtobeverygoodasitwillsupportmultimodalsplitandinteroperability.Thequalityoftheproposalisgood.Moreover,theleverageeffectoftheEUfundinginprivatefundingisveryhigh.
TheGlobalProject(MXPNorthRailAccess)aimstoconnectMalpensaAirportwiththeSimplonandGotthardinternationalrailwaylines.TheproposedActionconcernstheextension,fromTerminal1toTerminal2,oftheexistingpassengerrailway
linktoMalpensaAirport.
2012-IT-10071-P* • Part of Priority Project 10
MXPT2(Railink)-UP
PPs - New ActionMember States involved:Italy
Applicant:Railink S.r.l.
Requested funding
Total eligible costs €115,000,000
TEN-T requested funding: €23,000,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €115,000,000
TEN-T recommended funding: €23,000,000
TEN-T funding: 20%
*This proposal was originally submitted as 2012-IT-24071-P
Evaluation remarks
103
TheproposedAction isrelevanttothecallforproposalsandaddressestheTEN-Tpriorities,as itconcernsPriorityProjects6and24.Itismatureandreadytostartfromatechnicalpointofview.TheproposedActionisexpectedtogeneratepositivesocio-economicimpacts.Theoverallqualityisgood.Itiswellstructuredandconsistentfromatech-nicalpointofview.
The proposed Action concerns the first phase of a Global Project related to the upgrade of Novara Intermodal Terminal in northern Italy. CIM SpA - Interporto di Novara, which has built and manages the Freight Village (Interporto) of Novara, in
the areas siding the rail marshalling yard of Novara, has a strategic plan for industrial development 2011-2019. This plan consists of three phases, through which CIM Terminal and the connections with Novara Boschetto yard will be improved.
The present Action is included in the vast project aimed at realising a Single Intermodal Terminal (TIU) in Novara, consisting of three interconnected terminals and a system of logistics and service platforms, within and outside the Freight Village. The expansion and enhancement project of the west yard is composed of the following activities:
•Installationofa600mlongtrack•Revampingandincreasingtheintermodalyard•InstallationoffixedequipmentforITUtranshipment
2012-IT-24116-P • Part of Priority Project 6
CIM west terminal expansion
PPs - New ActionMember States involved:Italy
Applicant:C.I.M. S.p.A.
Requested funding
Total eligible costs €10,000,000
TEN-T requested funding: €2,000,000
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €10,000,000
TEN-T recommended funding: €2,000,000
TEN-T funding: 20%
Evaluation remarks
104
ThisproposedAction’srelevancetothecallforproposalsisverygood,sinceitwillleadtothephysicalimplementationoftheworkstoremoveabottleneckonPriorityProject28.Itsmaturityisexcellentbecausepreparatoryactionshavebeensuccessfullycompleted.TheimpactoftheproposedActionisalsogoodbecausethelineiscurrentlysaturated.Itsqualityisgoodandconsistentfromatechnicalpointofview.
TheproposedActionconcernsthestudiesfortheconstructionofanewrailwaylinefromLuxembourgtoBettembourg,neartheLuxembourg-FranceborderandlocatedonPriorityProject28(“Eurocaprail”ontheBrussels-Luxembourg-Strasbourg
railwayaxis).
They comprise the detailed pre-design and implementation plan for the new rail link between Luxembourg station andBettembourg,aswellastheupgradeofBettembourgstation.
2012-LU-28025-S • Part of Priority Project 28
EuroCap-Rail: studies for the construction of a new section providing the direct link Luxem-bourg Station-Bettembourg and the upgrading
of Bettembourg Station
PPs - New ActionMember States involved:Luxembourg
Applicant:Ministère du Développement durable et des Infrastructures
Requested funding
Total eligible costs €9,625,825
TEN-T requested funding: €4,812,911
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €9,624,000
TEN-T recommended funding: €4,812,000
TEN-T funding: 50%
Evaluation remarks
105
TheproposedActionishighlyrelevant,sinceiteliminatesthebottlenecksinrailwaytransportonPriorityProject27.Itismaturearepreparatorystepsareabouttobefinalised.TheproposedAction,inconjunctionwiththecomplementaryactivitiesandstudiesunderway,hasaleverageimpactondevelopmentofPriorityProject27.
TheproposedActionispartoftheGlobalProjectwhichisdevelopmentofEuropeangaugerailwaylineintheLatvianpartofPriorityProject27(“RailBaltica”axis:Warszawa-Kaunas-Riga-Tallinn-Helsinki).Itincludespreparatorystudiescovering
preliminarydesignandadditionaltechnicalstudiestobeginthedetailedtechnicaldesignandconstructionworksinthenextprogrammingperiod.
2012-LV-27120-S • Part of Priority Project 27
Preliminary design and operations studies for Rail Baltica railway line -
Latvian section
PPs - New ActionMember States involved:Latvia
Applicant:Ministry of Transport
Requested funding
Total eligible costs €9,840,000
TEN-T requested funding: €4,920,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €9,840,000
TEN-T recommended funding: €4,920,000
TEN-T funding: 50%
Evaluation remarks
106
TheproposedActionisveryrelevantasthestudyisaimingtoremoveacriticalrailwaybottleneckonPriorityProject12.Anexcellentmaturityisdemonstrated:basedontheoutcomeofpreviousstudyphasestheproposedActionhasalreadystarted.Ithasaverygoodimpactasthesectionconcernedisabusyrailwaywithpotentialforverygoodaddedvaluefromitsimprovement.Thequalityisverygoodastheorganisationalstructure,theriskmanagementandqualitymanagementpartsarewellinplace.
Theproposal concerns rail studies forexpanding8kmof lineofPriorityProject12 (NordicTriangle railway/roadaxis)betweenFlackarpandArlovfromtwotrackstofour,aswellasadjustingthreeintermediaterailwaystationstothenew
geometryofthetracks.TheexpectedresultofthestudyisanEnvironmentalImpactAssessment,arailwayplanandconstruc-tiondocumentspriortothedesignandconstructionphase.TheaimoftheprojectistocontinuethefourtracksalreadyinplacebetweenMalmoandArlov,thuseliminatingacapacityshortageonthishighlycongestedrailsectionofPriorityProject12.
2012-SE-12033-S • Part of Priority Project 12
Design studies for expansion to four tracks of Nordic Triangle at Flackarp-
Arlöv in Sweden
PPs - New ActionMember States involved:Sweden
Applicant:Swedish Transport Administration
Requested funding
Total eligible costs €19,086,678
TEN-T requested funding: €9,543,339
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €19,086,000
TEN-T recommended funding: €9,543,000
TEN-T funding: 50%
Evaluation remarks
107
TheproposedActionisveryrelevantasitaddressesanimportantbottleneckalongPriorityProject12.Alsoitsmatu-rityisexcellent.Ithasalreadystartedandtherearenopendingtechnicalissues.Itwillhaveaverypositiveimpactonlabourmarket,accessibility,mobility,trafficmanagementandnoise.Finally,theoverallproposalisofverygoodqualityintermsofitslogic,completenessandclarity.
TheGlobalProjectaddressestheWestCoastLinelocatedinsouthernSweden,andoneofthethreebranchesofPriorityProject12(NordicTrianglerailway/roadaxis).TheproposedActionconcernstheconstructionoftwo8.7kilometrelong
parallelrailwaytunnelsthroughtheHallandsåsRidge.
2012-SE-12048-P • Part of Priority Project 12
Completion of the railway tunnel through Hallandsås – a
priority project in the Nordic Triangle
PPs - New ActionMember States involved:Sweden
Applicant:Swedish Transport Administration
Requested funding
Total eligible costs €396,808,204
TEN-T requested funding: €79,361,640
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €396,808,000
TEN-T recommended funding: €79,361,000
TEN-T funding: 20%
Evaluation remarks
108
TheproposedActionhasanexcellentrelevancebyaddressinganimportantbottleneck.Itishighlymatureasthepre-paratoryworkshavealreadystarted.Itsimpactiswelldemonstratedthroughadetailedcost-benefitanalysis;itwillcontributetoshiftoffreightandpassengertransportfromroadtorail.ThequalityoftheproposalisexcellentingivingspecificinformationontheproposedAction,inparticularonitsorganisationstructureandriskmanagement.
Theproposalconcernstheconstructionofa1.5kmrailbridgeandtrackinGothenburg,doublingthecapacityoftheexist-ingsingletrack.TheproposalispartoftheGlobalProject“WestSwedishAgreement”,apackageofinfrastructureprojects
targetingpublictransport,railwaysandroadsinGothenburgarea.
TheaimoftheActionistoeliminateabottleneckandtofacilitatetheconnectionbetweenPriorityProject12andthePortofGothenburg.
2012-SE-12069-P • Part of Priority Project 12
The Gothenburg Port Line - railway bridge at Marieholm
PPs - New ActionMember States involved:Sweden
Applicant:Swedish Transport Administration
Requested funding
Total eligible costs €120,447,648
TEN-T requested funding: €24,089,530
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €120,445,000
TEN-T recommended funding: €24,089,000
TEN-T funding: 20%
Evaluation remarks
109
TheproposedActionisinlinewiththeTEN-TprioritiesasitaddressesabottleneckonPriorityProject6.Itsmaturityisgoodasitisreadytostartfromthetechnicalpointofview.TheimpactoftheActionwillbesignificantasacriticalstepleadingtophysicalimplementation.Theproposalisofverygoodquality.
The Action covers the building permit and executive design for the upgrade the Pragersko railway station, an important rail-way traffic hub situated at the double-track Zidani Most–Pragersko–Maribor–state border line and part of Priority Project 6
(Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border). It includes track devices (main tracks as well as tracks for dispatching and assembling trains, collecting cargo, storing wagons, etc.). In accordance with the ap-plicable construction legislation, both documents are the basis for the acquisition of the building permit and physical imple-mentation of the project.
2012-SI-06083-S • Part of Priority Project 6
Elaboration of the project for building permit and executive design for the arrangement of a hub by upgrading
the Pragersko railway station
PPs - New ActionMember States involved:Slovenia
Applicant:Ministrstvo za infrastrukturo in prostor Republike Slovenije
Requested funding
Total eligible costs €4,280,000
TEN-T requested funding: €2,140,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €4,280,000
TEN-T recommended funding: €2,140,000
TEN-T funding: 50%
Evaluation remarks
110
TheproposedActionishighlyrelevanttothecallforproposalsasitintendstoeliminateabottleneckonPriorityProject6.Itisverymatureasallapprovalshavebeenreceived.Itsimpactisgoodasitwillbeusedasinputtofurtherdecision-making.Theproposalisofgoodquality.
TheActionaimsatdraftingtheexecutiondesignforaD4categoryupgradeoftheexisting25kmlongmaindouble-trackelectrifiedZidaniMost–Celjerailwaysection,partofPriorityProject6 (RailwayaxisLyon-Trieste-Divača/Koper-Divača-
Ljubljana-Budapest-Ukrainianborder).Theexecutiondesign is,accordingtothenational lawapplicable,apreconditiontostarttheupgradingoftheline.
2012-SI-06086-S • Part of Priority Project 6
Execution design for upgrading the existing main double-track electrified
Zidani Most-Celje railway line
PPs - New ActionMember States involved:Slovenia
Applicant:Ministrstvo za infrastrukturo in prostor Republike Slovenije
Requested funding
Total eligible costs €3,500,000
TEN-T requested funding: €1,750,000
TEN-T funding: 50%
Recommended fundingTotal eligible costs: €3,500,000
TEN-T recommended funding: €1,750,000
TEN-T funding: 50%
Evaluation remarks
111
TheproposedActionisveryrelevant,contributingtoremoveasignificantbottleneckonPriorityProject13.Itsmaturityisveryhighsincetheworksareveryadvanced.Itsimpactisalsoverygoodintermsoftrafficflowimprovement,posi-tiveimpactontheroadservicelevel,roadsafety,aswellasonregionalandnationalcompetition.Furthermore,thequalityoftheproposedActionisverygood.
Theproposalconsistsofworkstoupgradethelast,remainingsinglecarriagewaysectionoftheA8road,astrategicallyim-portantroadwithinNorthernIrelandandpartofPriorityProject13(RoadaxisUnitedKingdom/Ireland/Benelux),between
Coleman’sCornerandBallyrickardRoad.This14kmlongsectionwillbeupgradedtoadualcarriagewaystandard.
2012-UK-13018-P • Part of Priority Project 13
A8 Belfast to Larne Dualling (Coleman’s Corner to Ballyrickard
Road)
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested funding
Total eligible costs €112,520,388.76
TEN-T requested funding: €22,504,078.56
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €91,860,000
TEN-T recommended funding: €18,372,000
TEN-T funding: 20%
Evaluation remarks
112
TheproposedActionisveryrelevanttothecallforproposalsbyimprovingmultimodalcapacitymainlyalongPriorityProjects13and26.Itcontributestothedevelopmentofrailoperations.TheproposedActionisverymature.Ithasexcellentpositivedirectandindirectsocio-economicbenefits.Thequalityoftheproposalisexcellent,wellstructured,andcomprehensive.
TheActioncomprisestheprocurement,installationandcommissioningofthreerailmountedgantrycraneswith41tonneliftcapacity,31mrailgaugeonthenewlyconstructedFelixstowerailterminal.Theterminalisduetobeoperationalmid-
2013withthreerailmountedgantrycranes.TheActionislocatedontheFelixstowe-Nuneatonrailwayline(locatedonPriorityProject26-Railway/roadaxisIreland/UnitedKingdom/continentalEurope)andtheA14trunkroad.InadditionasignificantschemeisbeingundertakenonPriorityProject26byNetworkRailInfrastructureLtdknownastheIpswichChordworks.Theoperationoftheseworksin2014willprovidesignificantopportunityalongwithsynergisticprojectstosignificantlyimprovecapacityandregulationofintermodalservicesalongthePriorityProject26andPriorityProject14(Westcoastmainline)roadandrailroutes.Theadditionofthreerailmountedgantrycranesthatwillbeoperationalby2014and2015ontheFelixstowerailterminalwillenableafurtherstepinthemodalswitchfromroadtorail.
2012-UK-26030-P • Part of Priority Project 26
Felixstowe rail terminal (phase 2) - Further improving intermodal transfer
and removing bottlenecks on PP26
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested funding
Total eligible costs €13,227,000
TEN-T requested funding: €2,645,400
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €8,620,000
TEN-T recommended funding: €1,724,000
TEN-T funding: 20%
Evaluation remarks
113
TheproposedActionishighlyrelevantasitaddressesexcellentlytheTEN-Tprioritiesandtheobjectivesofthecallforproposals.ItconcernsoptimisationofcapacityalongPirorityPorject26.Itsimpactisexcellent.TheproposedActionwillleadtoroaddecongestion,increaseinsafetyandenvironmentalbenefits.Thematurityandqualityareverygood,withastrongcommitmentbytheconcernedauthorities.
TheAction,IpswichChord,willdeliveranewrailwayinfrastructurelinkinguptwobranchesofPriorityProject26(Railway/roadaxisIreland/UnitedKingdom/continentalEurope)toallowrailfreightservicestotraveldirectlybetweentheTEN-TPortof
FelixstoweandkeyhubcitiessuchasBirminghamandManchester.
Currently,trainshavetoenterthegoodsyardatIpswich,andreconfigurebymovingthelocomotivetotheotherendofthetrainbeforebeingabletoproceedoutoftheyardontothewesternsectionoftheaxis.ThisActionwillremovethissignificantperformanceandcapacitybottleneckandallowfaster,safer,longerandmoredirecttrafficflowsbetweenthekeyTEN-TportsintheUKandalongthePriorityProject.
2012-UK-26058-P • Part of Priority Project 26
Completing PP26 south (Felixstowe- Nuneaton) and delivering the TEN-T Core
rail network in the UK: Ipswich Chord
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested funding
Total eligible costs €62,078,583.41
TEN-T requested funding: €12,415,717.68
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €62,075,000
TEN-T recommended funding: €12,415,000
TEN-T funding: 20%
Evaluation remarks
114
TheproposedActionishighlyrelevantbyaddressingtheremovalofabottleneckonasignificantrailwaysectiononPriorityProject26.Itdemonstratesitshighmaturitywithformalapprovalalreadyobtainedandcertaintasksalreadylaunched.Ithasaconsiderablepositiveimpactbothonmodalshiftandenvironmentalperformanceofthetransportsectorinthearea.Theoverallqualityoftheproposalisverygoodbyprovidingasufficientlevelofdetails,clarityandconsistencyinallcrucialpartsoftheproposal.
Theproposal,partofGlobalProjectthatcoverscompletionofPriorityProject26(Railway/roadaxisIreland/UnitedKingdom/continentalEurope)intheUK,concernstheelectrificationoftherailwaysectionfromManchestertoLiverpool,aswellas
theTransPennineElectrificationWestfromManchestertoStalybridge.
2012-UK-26060-P • Part of Priority Project 26
Completing PP26 north and deliver-ing the TEN-T Core rail network in the UK: Transpennine rail electrification
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested funding
Total eligible costs €155,159,807.71
TEN-T requested funding: €31,031,961.34
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €155,155,000
TEN-T recommended funding: €31,031,000
TEN-T funding: 20%
Evaluation remarks
115
TheproposedActionisveryrelevantandhasasatisfactorylevelofmaturity,expectedimpactsandquality.Concerningimpact,itisexpectedtocontributetothedevelopmentofBio-LiquidNaturalGasforHeavy-Goods-VehiclesintheUKalongthepriorityprojects.Itsmaturityisdemonstratedasimplementationisalreadyongoingandpreliminaryresultsareexpectedbyendof2014.Thiscouldserveasagooddecision-makingandpolicymakingtool.
TheActionaimsataddressingthethreemainbarrierstothedevelopmentofalternativefuels:thelackofinfrastructure,the lackofvehiclesatcompetitiveprices,andthe lowconsumerdemand.Studieswillbeundertaken includingapilot
componenttotesttheuseofBio-LNGinalivetrialwithHGVoperatorsusingapilotnetworkofopenaccessstorageandrefuellingterminalsservingpriorityaxesintheUK.Themainoutcomeofthestudywillbeabusinessmodelandaroadmapfordeploymentofbio-LNGacrosstheTEN-TnetworkthroughoutEurope.Theprojectactivitiesincludeapilotoffiverefuellingstationsandmobileinfrastructure.
2012-UK-26061-S • Part of Priority Project 26
Study to test the potential of Bio-LNG to con-tribute to European renewable energy targets
based on a pilot refuelling and storage network trialled with HGV fleet operators in the UK
PPs - New ActionMember States involved:United Kingdom
Applicant:Gasrec Ltd
Requested funding
Total eligible costs €16,411,000
TEN-T requested funding: €5,774,000
TEN-T funding: 35.18%
Recommended fundingTotal eligible costs: €16,408,572
TEN-T recommended funding: €5,743,000
TEN-T funding: 35%
Evaluation remarks
117
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillfacilitatethefinalisationoftheupgrademeasuresthatarepartofthisAction.ThematurityoftheActionisverygood.Thequalityoftheproposalisverygoodincludingsoundrevisedimplementationplans.
TheproposedActionrequestsanincreasedco-fundingratefrom6.64%to20%fortheAction2007-DE-04020-P(WorksfortheconstructionofthehighspeedraillinesectionbetweenSaarbrückenandLudwigshafen)Thisprojecttargetsat
reducinganimportantrailbottleneckbetweenSaarbrückenandLudwigshafen,GermanyonPriorityProject4,thehighspeedrailwayaxiseast.Workswillupgradethissectioninordertoreachtravellingspeedsupto200km/h,primarilyinvolvingtrackengineeringtaskssuchasrefinedlinealignment,strengtheningthegroundstructure,improvingtheclearanceoflevelcross-ingsandwideningbridges.Thetrack’swiringandcontrolandcommunicationstechnologieswillalsoberenewed—includingequippingthetrackwithERTMStechnology.
Linked to Action 2007-DE-04020-P
2012-DE-04057-P • Part of Priority Project 4
POS Nord
PPs - Ongoing ActionMember States involved:Germany
Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung
Requested funding
Total eligible costs €74,200,114
TEN-T requested funding: €9,913,135
TEN-T funding: 13.36%
Recommended fundingTotal eligible costs: €73,750,414.70
TEN-T recommended funding: €9,882,556
TEN-T funding: 13.4%
Evaluation remarks
118
The proposal has demonstrated that an increase of the co-funding rate will facilitate the implementa-tion of this Action that addresses a bottleneck. Thematurity of the Action is very good as its implementation isalreadyongoing.Thequalityoftheproposalisverygoodincludingconsistentrevisedimplementationplans.
The proposed Action requests an increased co-funding rate from 14.35% to 20% for the Action 2007-DE-17010-P (Works for the construction of a high speed line between Wendlingen and Ulm).
The new build Wendlingen-Ulm line forms part of the Stuttgart-Ulm-Augsburg upgrade project and is an integral part of Priority Project 17 (Railway axis Paris-Strasbourg-Stuttgart-Wien-Bratislava). It covers a track length of 59.575 km, of which 30.218 km (excluding the Wendlingen freight line) run in tunnel sections. The line is configured for mixed traffic (long-distance passenger traffic, in addition to fast and light freight trains).
Linked to Action 2007-DE-17010-P
2012-DE-17046-P • Part of Priority Project 17
Works for the construction of a high speed line: Wendlingen-Ulm section
PPs - Ongoing ActionMember States involved:Germany
Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung
Requested funding
Total eligible costs €625,741,449
TEN-T requested funding: €35,354,392
TEN-T funding: 5.65%
Recommended fundingTotal eligible costs: €537,895,748
TEN-T recommended funding: €30,383,615
TEN-T funding: 5.65%
Evaluation remarks
119
Theproposalhasdemonstrated thatan increaseof the co-funding ratewill facilitate thesmooth implementationoftheAction.ThematurityoftheAction isverygoodas its implementation isalreadyongoing.Thequalityoftheproposalisveryhighincludingsoundrevisedimplementationplans.However,takingintoaccounttheneedtomanagethescarcityoftheavailableTEN-Tfundingandtherevisedimplementationplansfortheprojectiswasdecidednottograntthemaximumallowedrate.
TheproposedActionrequestsanincreasedco-fundingratefrom11.61%to20%fortheAction2007-DE-17200-P(WorksfortheconstructionofthehighspeedlinebetweenStuttgartandWendlingen).
ItinvolvesanupgradeandnewbuildoftheStuttgart-Wendlingenline,includingStuttgart21,whichisanintegralpartofPri-orityProject17(RailwayaxisParis-Strasbourg-Stuttgart-Wien-Bratislava),aswellastheStuttgart-Ulm-Augsburgupgrade/newbuildline,includedintheFederalTransportInfrastructurePlanasapriorityproject.
Linked to Action 2007-DE-17200-P
2012-DE-17050-P • Part of Priority Project 17
Stuttgart-Wendlingen high speed line (including Stuttgart 21): upgrade and
works
PPs - Ongoing ActionMember States involved:Germany
Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung
Requested funding
Total eligible costs €756,688,129
TEN-T requested funding: €63,507,480
TEN-T funding: 8.39%
Recommended fundingTotal eligible costs: €756,688,129
TEN-T recommended funding: €20,616,775
TEN-T funding: 2.73%
Evaluation remarks
120
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillfacilitatetheimplementationoftheAction.ThematurityoftheActionisveryhighasitsimplementationisongoingandtimely.Thequalityoftheproposalisverygoodincludingsoundandconsistentrevisedimplementationplans.
TheproposedActionrequestsanincreasedco-fundingratefrom9.71%to20%fortheAction2007-DE-24060-P(Worksforconstructionandre-constructionofthepartiallyexistingrailwaysectionbetweenKarlsruheandBasel).Itconcernsthe
upgradeoftheexistingtwo-tracklinetofourtracksandconstructionofthenewhighspeedrailsegmentsbetweenKarlsruheandBaselonPriorityProject24(RailwayaxisLyon/Genova-Basel-Duisburg-Rotterdam/Antwerpen).
Linked to Action 2007-DE-24060-P
2012-DE-24037-P • Part of Priority Project 24
Upgrade/new construction of the Karlsruhe-Basel line with partial
upgrading of the existing line
PPs - Ongoing ActionMember States involved:Germany
Applicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung
Requested funding
Total eligible costs €338,913,000
TEN-T requested funding: €34,874,148
TEN-T funding: 10.29%
Recommended fundingTotal eligible costs: €327,714,565
TEN-T recommended funding: €33,721,829
TEN-T funding: 10.29%
Evaluation remarks
121
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillgiveasignificantimpulsetotheongoingworks.Thematurityoftheconcernedworksisveryhighandthefinalisationoftheimplementationoftheproposedworksbytheendof2015isrealistic.Theproposalisofverygoodquality.
The proposal concerns the works on the 60 km Bergara-Hernani section, located on PriorityProject3 (High speed railway axis of southwest Europe) and includes:
•AnincreaseintheTEN-Tco-fundingratefrom5%to30%fortheworkscontrolactivitiesoftheongoingAction2007-ES-03050-P(HighspeedrailwaylineParis-Madrid:newrailwaynetworkGuipúzcoano).
•WorksontheBergara-Hernanisection,asanewactivity,forwhichaco-fundingrateof30%isrequested.
Linked to Action 2007-ES-03050-P
2012-ES-03093-P • Part of Priority Project 3
Construction of the new rail network in the Basque Country. Gipuzoka section.
PPs - Ongoing ActionMember States involved:Spain
Applicant:Gobierno Vasco. Departamento de Medio Ambiente y Politica Territorial
Requested funding
Total eligible costs €1,087,899,223
TEN-T requested funding: €326,369,767
TEN-T funding: 30%
Recommended fundingTotal eligible costs: €39,556,579
TEN-T recommended funding: €5,933,487
TEN-T funding: 15%
Evaluation remarks
122
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectonthebudgetallocationbetweentheMemberStatesinvolvedthusfacilitatingtheimplementationoftheAction.ThematurityoftheActionisundisputableasitisongoingandintime.Theproposalisofverygoodquality,clearandcompleteandincludessoundrevisedimplementationplans.
This proposal requests an increase of the TEN-T co-funding rate from the current 27% to 30% for the ongoing Action 2007-EU-01180-P (Priority Project TEN no. 1 Brenner Base Tunnel – Works), part of the Global Project to build the Bren-
ner Base Tunnel, the centrepiece of PriorityProject1 (Railway axis Berlin-Verona/Milan-Bologna-Naples-Messina-Palermo).
The Action involves the so-called Phase III activities, aiming to fund the excavation of the Brenner Base Tunnel’s main tubes between 2010-2015. The works are the continuation of Phase II, which is running in parallel.
Linked to Action 2007-EU-01180-P
2012-EU-01099-P • Part of Priority Project 1
Priority Project 1: Brenner Base Tunnel - works
PPs - Ongoing ActionMember States involved:Italy, Austria
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested funding
Total eligible costs €558,900,000
TEN-T requested funding: €167,670,000
TEN-T funding: 30%
Recommended fundingTotal eligible costs: €558,900,000
TEN-T recommended funding: €16,767,000
TEN-T funding: 3%
Evaluation remarks
123
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectontheimplementationoftheActionandwillfacilitatetheinvolvedMemberStatestomakefurtherdecisionsontheGlobalProject.ThematurityoftheActionisverygoodastherevisedimplementationplansaresoundfromatechnicalandfinancialpointofview.Theproposalisofgoodquality.
This proposal requests an increase of the TEN-T co-funding rate from25% to 30%, forworks of the ongoing Action2007-EU-03080-P(StudiesandworksfortheHighSpeedRailwayAxisofSouthwestEurope(PriorityProject3)-Lisbon-
Madridaxis:cross-bordersectionÉvora-Mérida.
Linked to Action 2007-EU-03080-P
2012-EU-03115-P • Part of Priority Project 3
Works for the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid axis: Cross-border section Évora-Mérida
PPs - Ongoing ActionMember States involved:Spain, Portugal
Applicant:Dirección General de Ferrocarriles
Requested funding
Total eligible costs €174,625,856
TEN-T requested funding: €52,387,757
TEN-T funding: 30%
Recommended fundingTotal eligible costs: €174,625,856
TEN-T recommended funding: €8,731,293
TEN-T funding: 5%
Evaluation remarks
124
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectontheimplementationoftheAction.ThematurityoftheActionisverygoodastherevisedimplementationplansaretechni-callyandfinanciallysound.Thequalityoftheproposalisgood.
Located on PriorityProject6 (Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border), the proposal refers to the cross-border section of the common Franco-Italian part of the Lyon-Turin international section,
foreseen under the ongoing Action 2007-EU-06010-P.
It requests an increase of the TEN-T co-funding rate (from 27 to 30%) for the land acquisition component of the Action.
Linked to Action 2007-EU-06010-P
2012-EU-06049-P • Part of Priority Project 6
Request for additional 2012-2015 funds for land acquisitions on the
cross-border section of the Lyon-Turin
PPs - Ongoing ActionMember States involved:France, Italy
Applicant:Ministère de l’Ecologie, du Développement Durable et de l’Energie
Requested funding
Total eligible costs €684,316,192
TEN-T requested funding: €300,032,600
TEN-T funding: 43.84%
Recommended fundingTotal eligible costs: €189,697,509
TEN-T recommended funding: €5,690,925
TEN-T funding: 3%
Evaluation remarks
125
Theproposalhasdemonstratedthatanincreaseoftheco-fundingratewillhaveasignificantstimulatingeffectontheimplementationoftheAction.ThematurityoftheActionisverygoodasitincludesasoundandverywell-structuredrevisedimplementationplan.Theproposalisofveryhighquality,clearandcomplete.
ThisproposalrequestsanincreaseoftheTEN-Tco-fundingratefrom23.89to30%,fortheworksoftheongoingAction2007-EU-20050-P(StudiesandWorksfortheconstructionofFehmarnBeltFixedRail-Roadlink).
Linked to Action 2007-EU-20050-P
2012-EU-20024-P • Part of Priority Project 20
Fehmarn belt fixed rail/road link
PPs - Ongoing ActionMember States involved:Denmark, Germany
Applicant:Ministry of Transport (DK)
Requested funding
Total eligible costs €289,253,100
TEN-T requested funding: €106,534,500
TEN-T funding: 36.83%
Recommended fundingTotal eligible costs: €190,460,000
TEN-T recommended funding: €11,637,106
TEN-T funding: 6.11%
Evaluation remarks
126
TheproposedincreaseofTEN-TsupportishighlyrelevanttothecallforproposalsasitisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevel.Theproposalisofgoodquality.
ThisActionisrelatedtothecross-bordersectionofPriorityProject30linkingtheFrenchandBelgianinlandwaterwaynet-work,inclassVbontheentiresection.Theobjectiveistocreate,onamajoraxis,anewEuropeanfretcorridorlinkingthe
northernportsfromLeHavretoRotterdamtotheinlandportsinnorthernEurope(Paris,Lille,Bruxelles,Lliège,Duisburg,…).
This link will allow the economic stakeholders in various industrial and logistical sectors to concentrate their means on the inland waterway and railway networks, putting the transport nodes at the vicinity of production, transformation and consump-tion areas. Completing the missing link of the Seine North Europe canal (SNE) between Compiègne and Aubencheul-au-bac is a prerequisite.
The inland waterway transport network associated to SNE will provide for a reduction of the energy consumption linked to fret transport, for safer roads, congestion reduction and CO2 reduction, whilst developing waterborne logistic services fitting supply needs in urban areas.
Linked to Action 2007-EU-30010-P
2012-EU-30081-P • Part of Priority Project 30
Seine-Scheldt Inland Waterway Network – Crossborder section between Compiègne and Ghent
PPs - Ongoing ActionMember States involved:France, Belgium
Applicant:Ministère de l’écologie, du développement durable et de l’énergie
Requested funding
Total eligible costs €1,016,151,001
TEN-T requested funding: €354,735,000
TEN-T funding: 34.91%
Recommended fundingTotal eligible costs: €37,300,000
TEN-T recommended funding: €11,190,000
TEN-T funding: 30%
Evaluation remarks
127
TheproposedincreaseofTEN-Tsupportishighlyrelevanttothecallforproposalsasitisexpectedtopartiallyal-leviatethefinancialburdencausedbytheincreaseofthecostoftheproject.ThereforetheincreasedEUcontributionisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.
The proposal concerns the request for the increase of co-funding rate from 5% to 20% for the ongoing action “Works for the development of the railway line connection between Helsinki Airport and the PP12 lines” - 2007-FI-12050-P. This
project consists of works for construction of a double track electrified line connecting Helsinki Airport to the city centre and to the national rail network.
Linked to Action 2007-FI-12050-P
2012-FI-12087-P • Part of Priority Project 12
Airport railway line (RING-line)
PPs - Ongoing ActionMember States involved:FInland
Applicant:Ministry of Transport and Communications
Requested funding
Total eligible costs €290,426,101
TEN-T requested funding: €58,085,220
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €178,585,651
TEN-T recommended funding: €26,787,847
TEN-T funding: 15%
Evaluation remarks
128
TheproposedincreaseofTEN-Tsupportishighlyrelevanttothecallforproposalsasitisexpectedtopartiallyallevi-atethefinancialburdencausedbytheincreaseofthecostoftheproject.ThereforetheincreasedEUcontributionisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.
Located on Priority Project 3 (High-speed railway axis of southwest Europe), the proposal refers to the ongoing Action 2007-FR-03010-P (High speed railway line between Nîmes and Perpignan) related to the 70 km Nimes and Montpellier
bypass (CNM).
The proposal requests an increase in the co-funding rate (from 5 to 20%) for the following activities:
•Activity4:-worksonjunctionsunderRFFauthority•Activities6and7:CNMcivilworksandworksonrailinfrastructures(underPPPcontractorauthority)
Linked to Action 2007-FR-03010-P
2012-FR-03056-P • Part of Priority Project 3
Nimes-Montpellier bypass - Works
PPs - Ongoing ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested funding
Total eligible costs €1,133,896,589
TEN-T requested funding: €226,779,317
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €696,532,737
TEN-T recommended funding:€104,479,910
TEN-T funding: 15%
Evaluation remarks
129
Theproposal isrelevant,asthe increasedEUfundingwillhelptofillthegapinthenationalfunding.TheAction ismature,theconcernedactivitieshavestartedandareprogressingasscheduled.Thequalityoftheproposalisgood,theactivitiesbeingconsistentwiththeAction’sobjectivesandwiththeimplementationplans.
Located on Priority Project 3 (High-speed railway axis of southwest Europe), the proposal refers to the 2nd phase works on the Bordeaux railway junction, foreseen under the ongoing Action 2007-FR-03120-P (Elimination of rail bottlenecks
around Bordeaux).
The proposal requests to increase the co-funding rate (from 5 to 20%) for the civil engineering and railway equipment works between the Cenon junction and La Benauge, listed under activity 2 of the current co-funding Decision (2011)5619.
Linked to Action 2007-FR-03120-P
2012-FR-03059-P • Part of Priority Project 3
Relieving congestion at the Bordeaux railway hub
PPs - Ongoing ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested funding
Total eligible costs €147,324,509
TEN-T requested funding: €29,464,902
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €147,324,509
TEN-T recommended funding: €22,098,676
TEN-T funding: 15%
Evaluation remarks
130
TheproposedincreaseofTEN-Tsupportishighlyrelevanttothecallforproposalsasitisexpectedtopartiallyallevi-atethefinancialburdencausedbytheincreaseofthecostoftheproject.ThereforetheincreasedEUcontributionisexpectedtofacilitatethesmoothimplementationoftheAction.TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.
The proposed Action requests for an increased co-funding rate from5% to 20% for Activity 3 of the ongoing ActionSouthernAccesslinetoBrenner.
Moreconcretely,Activity3consistsoftheconstructionofthefirstfunctionalphaseofsub-lot1,betweenFortezzaandPonteGardena.Theothertwoactivitiesregardtheupdateofthepreliminarystudyanddefinitiveprojectforlots1and4,Fortezza-PonteGardenaandaccesstoVeronarespectively,currently50%co-funded.
Linked to Action 2007-IT-01030-M
2012-IT-01079-P • Part of Priority Project 1
Southern Access line to Brenner
PPs - Ongoing ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested funding
Total eligible costs €36,890,340
TEN-T requested funding: €7,378,068
TEN-T funding: 20%
Recommended fundingTotal eligible costs: €36,890,340
TEN-T recommended funding: €5,533,551
TEN-T funding: 15%
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
132
The proposed Action aims to improve performance at a lower cost through harmonisation and common activities of the “COOPANS
Build B2.5” system. Based on the COOPANS Build 2 system baseline, Build 2.5 is an evolution, specifically addressing the following areas of improvements at operational and technical level:•Improvedinterfacewithterminalunits•Improvedinterfacewithairports•Crossborderservicestoenableflexibleairspacemanagement•New surveillance technologywith enhanced air/ground interoper-ability
•Safety improvements and extension of support for situationalawarenessintheterminalarea
•Collaborativeresourceplanningatairports•InfrastructurearchitectureharmonisationforARTAS•Technicalextensionofsystemresourcecapabilities
The Action aims to develop the following 9 inter-dependent Centralised Services (CSs):•CS1‘FAS’:Flightplanandairportslotconsistencyservice•CS2‘4DPP’:4DTrajectorycalculationserviceforplanningpurposes•CS3‘ETKR’:Europeantrackerservice•CS4‘AFUAS’:Advancedflexibleuseofairspacesupportservice•CS5‘EAIMS’:EuropeanATMinformationmanagementservice•CS6‘CNR’:Managementofcommonnetworkresourcesservice•CS7‘NIPS’:Networkinfrastructureperformancemonitoringandanal-ysisservice
•CS8‘PENS’:Pan-Europeannetworkservices•CS9‘DCS’:Datacommunicationservice
The centralised provision of these ATM services will contribute to the overall service level improvement for the ultimate clients of the ATM network, the airspace users and, as a result, passengers and freight op-erators.
TheproposedAction is of limited relevance to the callforproposals.Maturityisconsideredsufficient,althoughit isdifficult toestimatethefeasibilityoftheproposedtimeframefortheimplementationoftheAction.Itfailsto demonstrate the anticipated socio-economic impactand environmental impact. The overall quality of theproposalispoor.
Implementation of harmonised functionality for COOPANS
Build 2.5
2012-EU-40007-P
Set-up of centralised services to contribute to SES performance
achievement
The proposed Action meets only partly the objec-tivesof thecall forproposalsas itensuresonlybroadrelevancetotheATMMasterPlan.Itisnotmatureenoughas commitment fromkey stakeholders ismissing. Thiswill jeopardisethe implementationofseveralactivities.Inaddition,theworkonseveraloftheproposedcentral-ised services gowell beyond 2015. The description ofimpact is good, albeit no case forwhether or not it isadvantageous to centralise certain services has beenmade.Theoverallqualityoftheproposalisgood.
2012-BE-40010-S
ATMMember States involved:Belgium
Applicant:EUROCONTROL
Requested fundingTotal eligible costs €56,805,949
TEN-T requested funding: €28,402,974.50
TEN-T funding: 50%
Recommended funding €0
ATMMember States involved:Austria, Italy, Sweden
Applicant:LFV
Requested fundingTotal eligible costs €7,072,778
TEN-T requested funding: €1,414,556
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
133
The proposed Action aims to contribute to the FAB CE’s objectives of capacity and efficiency increase as well as
an improvement of the cost effectiveness. Accordingly, the specific objectives for the project are:
•Establishmentofanimprovedinterfacebetweenen-route(freeroute)airspaceandthemajorairportsintheFABCEairspace(“Seamlessoperation”)
•Implementation of the enablerswithin the scope of theSESARInterimDeploymentPlan(IDP).
FAB Central Europe: pilot seamless operation
2012-EU-40013-S
TheproposedActionfailstodemonstrateitsrelevancetothecallforproposals.Itsmaturityisweakastherearerisksthatitsobjectiveswillnotbeachievedduetolatetiming.Itfailedtosubstantiatethepotentialimpact.ThequalityoftheproposedActionisweakandthedescrip-tionofactivitiescontainsinconsistencies.
COOPANS operational harmonisation study
The overall maturity of the proposed Action is verygood.However, it isof limited relevance to thecall forproposals.ThedescriptionofthepotentialimpactsoftheproposedAction is limited.Thequalityof theproposedActionisnotsufficientlygoodasitlacksclarityandstruc-ture.
For this project, three out of five ANSPs of the COOPANS partnership (ACG, IAA and LFV) will perform a study for the
next upgrade (Build 2.5) of the TopSky product. The study will include the definition, harmonisation and ordering the upgrade from the manufacturer.
2012-EU-40008-S
ATMMember States involved:Austria, Italy, Sweden
Applicant:LFV
Requested fundingTotal eligible costs €3,768,934
TEN-T requested funding: €1,884,467
TEN-T funding: 50%
Recommended funding €0
ATMMember States involved:Austria, Czech Republic, Hungary, Slovenia, SlovakiaApplicant:Austro Control Österreichische Gesellschaft für Zivilluftfahrt
Requested fundingTotal eligible costs €26,096,058
TEN-T requested funding: €13,048,029
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
134
TheaimoftheActionistoequiptheaerodromecontrolserv-ices of Budapest Liszt Ferenc International Airport with a
backuplocationorsystemforemergencysituations(naturaldis-asters, terrorattacks, technicalfailures)orduringtherenewalworksperiodoftheHungaroControlcontroltower,whentheAir-portwouldnotbeabletomaintaintheaerodromecontrolactivi-tiesandthemovementoftraffic.
Thecontingencyfacilitywillbeestablishedonthe2ndfloorofthenewlybuiltANSIIIbuilding,intheso-calledVirtualContingencyFacilityoperationsroom(VCF).Theimplementationisbasedontheduplicationofalltheairporttechnicalsystemsindependentofthecontroltowerbuilding-makingitpossibleforairtrafficcontrollers to provide service at a capacity which is normallyprovidedinlowvisibilityconditions.
In line with the requirements of EC Regulation 29/2009/EC and the FAB CE Free Move Scenario, the Action aims to
develop the Hungarian air traffic control system MATIAS (Mag-yar Automated and Integrated Air Traffic System) in order to fulfil the requirements relating to the CPDLC (Controller- Pilot Data Link Communication — the standard communication between the air traffic controller and the pilot through data link). As a result, MATIAS will secure the necessary and system-wide requirements of the FAB-CE Free Move Scenario, as well as realise the innovations needed for required aviation safety.
TheproposedActiondoesnotcomplywiththerequire-ments of the call for proposals as it is not a baselinedeployment area identified in the Interim DeploymentProgramme. Itsmaturity is insufficientas keyprepara-tory steps have not yet been fulfilled. The proposedAction fails to demonstrate to a satisfactory level theanticipated socio-economic effects. The descriptionsuffers froma lack of detailwhich lowers significantlythequalityoftheproposal.
rTWR - Development of remote (virtual) tower
2012-HU-40012-P
MATIAS Build 10, development of MATIAS air traffic control
system
Overall, theproposedAction isnot in linewith thecallforpropsoals.Itisfairlymature,however,thereisinsuf-ficientinformationavailabletojudgethematurityfromthe planning point of view. The impacts are describedinabriefandgenericmannersothatnosubstantiatedsocio-economicbenefitscanbeassumed.Ingeneral,theproposal suffers from the provision of insufficientrelevantinformation,whichleadstoalowoverallquality.
2012-HU-40011-P
ATMMember States involved:Hungary
Applicant:HungaroControl Hungarian Air Navigation Services PLC
Requested fundingTotal eligible costs €13,169,350
TEN-T requested funding: €2,633,870
TEN-T funding: 20%
Recommended funding €0
ATMMember States involved:Hungary
Applicant:HungaroControl Hungarian Air Navigation Services PLC
Requested fundingTotal eligible costs €7,796,312
TEN-T requested funding: €1,299,386
TEN-T funding: 16.67%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
135
The Global Project concerns the deployment of ETCS on all SNCB trains. The proposed Action aims to upgrade 64 and
retro-fit 21 coaches with ETCS to run on the Belgian and Lux-embourg network.
Theproposalconcernstheequipmentof10locomotives(5fittedand5retrofitted)with theETCSBaseline2release
2.3.0dandfuturebaseline3.xstandards.
Although the proposed Action is not part of a larger Global Project, it will contribute to better use of ERTMS equipped fleet on the ERTMS Corridor B in Austria.
ThematurityoftheproposedActionisverygoodasithasalreadystartedanditsimpactisalsogoodbyenablingcross-border traffic.However, the relevanceof thepro-posedActiontothecallforproposalscannotbeclearlyestablished as key information in that respect has notbeen provided. Furthermore, the poor quality of theproposal does not allow its full assessment. Crucialinformation is not included such as implementationtimingandstrategy,expecteddeliverables,etc.
The proposed Action addresses the objectives ofthe TEN-T policy and the call for proposals. It is alsomature as certain activities have already started. Theimpact of the proposal is very limited because of thesmall number of locomotives concerned by the Action.Moreover, the quality of the proposal is very poor asessential information about the implementation of theActionhasnotbeenprovided,includingdetaileddescrip-tionofitsactivities.
2012-BE-60024-P
ETCS installed on the pilot coaches type I11 and type M6
2012-AT-60001-P
ETCS onboard equipment of TX Logistik Austria AG locomotives to operate on ERTMS Corridor B
(ETCS-TXLA)
ERTMSMember States involved:Austria
Applicant:TX Logistik Austria GmbH
Requested fundingTotal eligible costs €2,915,750
TEN-T requested funding: €1,457,875
TEN-T funding: 50%
Recommended funding €0
ERTMSMember States involved:Belgium
Applicant:NMBS/SNCB
Requested fundingTotal eligible costs €17,367,000
TEN-T requested funding: €5,833,500
TEN-T funding: 33.59%
Recommended funding €0
136
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The purpose of the Action is to fit all Danish rolling stock for passenger services with ERTMS onboard equipment, together
with STM-DK to operate both on the existing ATC and planned ERTMS infrastructure on the conventional lines throughout Denmark.
The Action, implemented by Rail Net Denmark with Alstom as sup-plier, uses Danish passenger railway undertakings (onboard custom-ers) to fulfill passenger public service contracts. The aim is to prepare Danish rolling stock for the implementation of ERTMS Level 2 Base-line 3.0 infrastructure.
The retrofit of onboard equipment will be carried out by the following railway undertakings:
•63vehiclesbyDSB•7vehiclesbyRegionstogA/S•1vehiclebyNordjyskeJernbanerA/S
TheproposedActionfailedtodemonstratesufficientlyitsrelevancetothecallforproposalsasitmayconcernalsodevelopment of a Specific TransmissionModule (STM),whichisoutsidethescopeofthecall.TheActionisreadytostartbutsomepartsof itwillbecontinuingbeyond2015. The impact is mainly at national level. Finally,insufficient informationon theAction itselfunderminesthequalityoftheproposal.
2012-DK-60003-P
Implementation of ERTMS Baseline 3 on passenger rolling stock in Denmark - first of class
ERTMSMember States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested fundingTotal eligible costs €78,193,318
TEN-T requested funding: €39,096,659
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action concerns the retrofit of 81 existinglocomotives and the fitting of five new locomotiveswith
ETCS. Following the technical specifications, the locomotiveswillrunon7differentTEN-TPriorityProjects(PP1,PP5,PP6,PP17,PP22,PP23,PP24).
The proposed Action is highly relevant to the call forproposalsasitaddressesrailinteroperabilityatEUlevelthrough ERTMS deployment. The Action is expected tohave a good impact in terms of safety and interoper-ability. Although some preparatory steps have alreadybeentaken,thequalityoftheprovidedinformationdoesnotallowtoconcludeonkeyfeaturesoftheAction,suchas definition of subsystems, interoperability tests andcrossacceptance,thusunderminingthereadinessoftheActiontostart.
2012-DE-60010-P
Equipment of 86 freight locomo-tives with ETCS on-board-units
according to SRS 2.3.0d/ Baseline 3
ERTMSMember States involved:Germany
Applicant:Railpool GmbH
Requested fundingTotal eligible costs €12,650,000
TEN-T requested funding: €6,325,000
TEN-T funding: 50%
Recommended funding €0
137
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedActionfocusesontheretrofitting(ETCSBase-line2release2.3.0d)ofexistingTRAXXlocomotives(Bom-
bardierTransportation).The4applicants(MacquarieEuropeanRail Ltd, Beacon Rail Leasing Ltd, Alpha Trains LuxembourgsarlandRBSAssetFinanceEuropeLtd)proposethefollowingmaximumnumbersofvehiclesfortheapplication:23TRAXXAC1,53TRAXXAC2and10TRAXXMSlocomotives.Theywillbeusedonthefollowingrailfreightcorridorsorpartsthereof:
•Corridor1:Rhine-Alpcorridor(TEN-TPriorityProject24)•Corridor3:CentralNorth-Southcorridor•Corridor8:CentralEast-Westcorridor
Thequalityoftheproposalisgoodanditisrelevanttothecallforproposals.Itisexpectedthatitwillproducehigh impact on interoperability, competitiveness andmodalshift.However,itsmaturityisunderminedbylackof financial commitment and unachieved preparatorysteps. Moreover, there are some uncertainties wheth-er the results will be delivered within the timeframeproposed.
2012-EU-60004-P
Prototyping, testing, certifying and retrofitting of TRAXX locomo-tives to ETCS 2.3.0d / Baseline 3
ERTMSMember States involved:Luxembourg, United Kingdom
Applicant:Macquarie European Rail Limited (Luxembourg Branch)
Requested fundingTotal eligible costs €37,465,056
TEN-T requested funding: €6,450,000
TEN-T funding: 17.22%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The purpose of the Action is to fit the Contec Rail locomotives by designing, testing and roll-out of ETCS level 2 Baseline
2.30d onboard equipment on a limited number of trains (five) to test the integration between ETCS and the STM-DK module. Following the successful test of Baseline 2.3.0d and STM-DK will be the design, test and roll-out of ECTS level 2 Baseline 3.0 and STM-DK onboard system as first of class and serial installation.
TheproposedActionisrelevanttothecallforproposalsas it addresses deployment of ERTMSand is expectedto produce a positive impact on interoperability andsafetyaspects.However,thematurityoftheActionisnotdemonstratedas there isnoevidenceof theavailabil-ityofco-fundingpartsorofthetechnicalreadinessthatwouldallowtheActiontostart.Moreover,thequalityoftheproposalislowbecauseinformationprovidedmostlyrelatestotheGlobalProjectratherthantotheconcernedAction.
Upgrade or equipment of trains with Baseline 3
2012-DK-60026-P
ERTMSMember States involved:Denmark
Applicant:Contec Rail Aps
Requested fundingTotal eligible costs €1,114,472
TEN-T requested funding: €557,236
TEN-T funding: 50%
Recommended funding €0
138
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposal concerns testing (in accredited laboratoriesfollowed by on-site validation) of ERTMS on-board units
andlineequipmentonlevel1andlevel2lines.ItisapartofaGlobal Project that covers successful implementationof theprovisionsofthethirdMemorandumofUnderstanding(MoUof16April2012)signedbetweentheEuropeanCommissionandtheEuropeanrailassociationsinthefieldofERTMS.TheActionaimsatreducingtestingcostsusingaremotelabora-tory.
The proposed Action is relevant to the overall objec-tives of TEN-T Guidelines and the call for propos-als. In addition deliverables of the proposed Actionhave the potential to be used as a decision tool forfuture ERTMS deployment. Nevertheless, the proposedAction fails to demonstrate sufficient technical matu-rity so that it could start. The quality of the proposedAction is low and it lacks sufficient description ofactivities;noclearprojectmanagementplanisprovided.
2012-EU-60032-S
Facilitating and speeding up ERTMS interoperability
ERTMSMember States involved:Belgium, Germany, France, Italy, United Kingdom
Applicant:Multitel
Requested fundingTotal eligible costs €10,668,816
TEN-T requested funding: €5,334,408
TEN-T funding: 50%
Recommended funding €0
The Global Project addresses the ERTMS migration of the French high speed lines. The proposed Action concerns
studies to define new formal specifications for the trackside subsystem and the Radio Block Centre (RBC) modelling. The objective of the Action is to prepare the tender documents for the trackside ERTMS deployment on the French high speed lines.
Although the proposed Action is mature and ready tostart from a technical point of view, it is not relevanttothecallforproposalsasitisnotrelatedtothe2012ERTMS Memorandum of Understanding. Moreover, theimpact in terms of decision and policy making is notsubstantiated.Finally,thequalityispoorastheinforma-tion provided is not complete or fullymissing in someparts.
2012-FR-60017-S
Formalisation of the ERTMS standards for the HSL equipped
with TVM
ERTMSMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested fundingTotal eligible costs €4,013,756.33
TEN-T requested funding: €2,006,878.16
TEN-T funding: 50%
Recommended funding €0
139
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Theproposed—standalone—Actionconcernstheequip-ment with GSM-R and ETCS Level 2 baseline 2 of a
regional,singletrack84kmlongline,followedbytheupgradetobaseline3withlevelcrossingfunctionality.
TheproposedAction’s relevance to thecall forpropos-als ispoorascompatibility testsarenot included. It isnotmatureassomenecessaryapprovalshavenotyetbeenattributedandtheworksareexpectedtostartlateforthetimelineofthiscallforproposals.Moreover,theproposedAction—whichinvolvesaregionalstandaloneline—willhaveaverylimitedimpactoninteroperability.Thequalityispoor.
2012-IT-60029-P
Outfitting of rail lines, RFT and TFT rolling stock with ERTMS/
ETCS L2 and GSM-R (SST and SSB)
ERTMSMember States involved:Italy
Applicant:Rete Ferroviaria Toscana S.pA.
Requested fundingTotal eligible costs €21,255,550.99
TEN-T requested funding: €10,627,775.99
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposal concerns development of tools aiming at improving quality of tests of ERTMS equipment.
Itisapartofglobalprojectthatcoverssuccessfulimplemen-tationoftheprovisionsofthesecondMemorandumofUnder-standing(MoUof4July2008)signedbetweentheEuropeanCommissionandtheEuropeanRailwaysectorAssociationsinthefieldofERTMS.
TheActionaimsat facilitatingand consolidating theERTMSdeployment.
TheproposedActionfailstoaddresssufficientlythecallforproposalsasitsobjectivesarereferringtoonelabo-ratoryonly.Itdemonstratesappropriatematurityastheinitial specification documents were already producedandtheprojectisreadytostartfromthetechnicalpointof view. Nevertheless its impact is considered limitedto one Member State. The proposal’s overall quality,especiallyintermsofcompletenessandclarity,ispoor.
ERTMS data log analyser
2012-IT-60021-P
ERTMSMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €6,000,000
TEN-T requested funding: €3,000,000
TEN-T funding: 50%
Recommended funding €0
140
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Theproposed Action involves the implementation/upgradeofETCSforupto50DE6400locomotivestoenableopera-
tiononrailtracksequippedwithETCSandlegacyATPsystemsinBelgium,TheNetherlandsandGermany.
The relevance of the proposed Action is adequatelydemonstratedmeetingboth theTEN-Tpriorities (Prior-ityProject24)andthecallforproposal’sobjectives.Itspositiveimpactishightakingintoaccountthenumberoflocomotivesforeseenfor retrofit/upgradeand theearlyimplementation of the Baseline 3. The quality of theproposal isgood.However, theproposedActionfailstodemonstratesufficientmaturitysincethereisnoindica-tionon the timingofcontractualproceduresnecessaryfortheActiontostart.
2012-NL-60007-P
Retrofitting & upgrading diesel vehicles; developing on board unit software and
specific vehicle implementation designs, prototyping, testing, certifying and
installation works
ERTMSMember States involved:The Netherlands
Applicant:DB Schenker Rail Nederland NV
Requested fundingTotal eligible costs €16,614,000
TEN-T requested funding: €7,087,000
TEN-T funding: 42.66%
Recommended funding €0
The Global Project consists of the modernisation of the106 railway line on the Psary-Starzyny-Kozłów-Kraków
section. The proposed Action aims at deploying ERTMS L1on two railway lines (Psary-Starzyny and Starzyny-Kozłów),totallingabout36km.
TheproposedActionaddressesPriority2ofthecallforproposalsandisthereforeconsideredrelevant.Itsmatu-rityisquestionableastheworkswillonlystartverylatefor the timing of this call for proposals. The proposedAction’s impact is not adequately documented andoverall limited due to the relative small size of theproposedAction.Theoverallproposalisofgoodquality.
2012-PL-60031-P
Deployment of ERTMS/ETCS level 1 in railway lines 570 and 64 on the Psary-Kozłów section
ERTMSMember States involved:Poland
Applicant:PKP Polskie Linie Kolejowe S.A.
Requested fundingTotal eligible costs €2,312,370
TEN-T requested funding: €1,156,185
TEN-T funding: 50%
Recommended funding €0
141
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
STM - Smart Traffic Management
TheproposedAction isof low relevance to thecall forproposals.WhilstittakesastagedapproachfromreviewofstateoftheartacrossEurope,optimisationofinfor-mation,pilottestingatselectedsites,andpan-Europeandisseminationofresults,itremainslimitedtointhedo-mainsitcovers:usingITSforprovisionofinformationonsafetyunderadverseweatherconditions;environmentalemissionscontrolandtrafficcontrolduringpeakseasonalevents.Theproposalfailstodetailhowtheoutputswillbeimplementedonawiderscale,thusunderminingtheimpactoftheAction.Thematurityisnotdemonstratedandthequalityoftheproposalislow.
TheSmartTrafficManagement(STM)projectinSpainaimsto:
•DevelopITSsolutions,coordinatedataEuropeanlevel,forcommonproblemsontheTEN-Troadnetwork,particularlyinfieldslackingofahomogeneousapproach.
•SupporttheimplementationofITSsolutionsunderadverseweathersolutions, looking to improve road safety bymeans of control ofweathervariablesandtheirincidenceinfrictioncoefficients.
•Generaliseasystemforroadtrafficemissioncontrolandtrafficman-agementtoreducetheenvironmentalimpactofroadtraffic.
•Stimulatetheprovisionofaddedvalueandhighqualityinformationtoroaduserswithspecialsensitiveness,suchaslargetrafficflowsontheSpanishroadnetworkcomingfromnorthernEuropeancountries(i.e.France,Belgium)tonorthernAfricaduringsummertime.
2012-ES-50011-S
ITS-EETSMember States involved:Spain
Applicant:Asociación Española de la Carretera (AEC)
Requested fundingTotal eligible costs €1,883,200
TEN-T requested funding: €941,600
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The Global Project addresses the ERTM trackside andon-board deployment along Corridor E (Dresden-Prague-
Vienna/Bratislava-Budapest-Bucharest-Constanta). The pro-posedActionaimsatconductingapreparatorystudyontheimplementation of ERTMS on several Slovakian sections ofCorridorE.
TheproposedActionisverymatureandits impactandquality are satisfactory. However, being a preparatorystudy,whichdoesnotdirectly leadto the implementa-tionofworksunderminesitsrelevancetoPriorityArea2oftheERTMScallforproposals.
ERTMS deployment on Slovak part of Corridor E: state border CZ/SK–Kúty–junction Bratislava–Rusovce–
state border SK/HU
2012-SK-60030-S
ERTMSMember States involved:Slovakia
Applicant:Ministry of Transport, Construction and Re-gional Development
Requested fundingTotal eligible costs €3,492,200
TEN-T requested funding: €1,746,100
TEN-T funding: 50%
Recommended funding €0
142
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
ThisAction,which includesTEN-T roadoperator inNordiccountriesandnorthernGermany,intendstodelivertravel-
lerinformationandtrafficmanagementservicesontheNordicTriangleandthesurroundingroadnetwork.Theobjectiveistopioneertheestablishmentofacross-borderinformationnet-workandestablishinteroperablecoreEuropeanITSservices.Insupportoftheserviceprovision,theprojectwillcarryoutITSdeploymentandrelatedICTinfrastructure.
TheproposedActionisrelevanttothecallforpropsoals.However, it fails todemonstrateco-ordinationbetweentheapplicantsandlacksaconcertedcorridorapproach.Additionally,thecross-borderelementisnotsufficientlysubstantiated.Althoughithasalreadystarted,thereareconcernsaboutitsmaturityduetothegapsinthetime-line,theconsistencyofthespecifictaskstobeexecutedandthefactthattheprojecthasnotyetbeenendorsedbyakeyparticipant’sMemberState.Positivesocio-eco-nomiceffectscouldbeanticipatedbutthesearenotsuf-ficientlysubstantiated.Thequalityoftheproposalislowwithimportantelementsmissing.
2012-EU-50001-P
NEXT-ITS – ITS on the Extended Nordic Triangle
ITS-EETSMember States involved:Sweden, Germany, Denmark, Finland
Applicant:Swedish Ministry of Enterprise, Energy and Com-munications / Swedish Transport Administration
Requested fundingTotal eligible costs €134,427,000
TEN-T requested funding: €26,885,400
TEN-T funding: 20%
Recommended funding €0
GeoToll Pay
TheproposedAction’s relevance to thecall forpropos-alsismodestasitdoesnottakeintoaccountfullytheEuropean policy context and barriers to pan-Europeandeployment. Whilst it is technically mature and hasformalpoliticalapproval, its likely impact isvery local-ised.ItsqualityislowintermsofachievingtheproposedAction’sobjectivesandnotsufficientlyspecifiedtoguar-anteeeffectivetechnicaldeliveryofitsprojectetoutputs.
The Global Project, of which this Action is part, concen-tratesontheimplementationofasystemofelectronictoll
collection via mobile devices in Portugal. The two-phaseGlobal Project includes a feasibility system implementationanalysis(study)andsystemimplementation(works).
The proposed Action, the Global Project’s first phase, is astudy which should allow the feasibility assessment of theimplementation. Itwill lookat thefollowingelementswhichwillbepartofthesystem:routeidentificationandcalculationmethod,billing/paymentmethod,technologicalinfrastructureperformance/behaviour and ease/convenience of mobiledevicesfortollpayment.
2012-EU-50002-S
ITS-EETSMember States involved:Portugal, Spain
Applicant:DGAE - Direção-Geral das Atividades Económicas (Ministério da Economia e do Emprego)
Requested fundingTotal eligible costs €325,344
TEN-T requested funding: €162,672
TEN-T funding: 50%
Recommended funding €0
143
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Arc Atlantique Traffic Management Corridor
The proposed Action addresses the call priority fordeploymentinaregionalcorridoroftrafficmanagementservices. However, coordinated and focused roll-out ofthe core services is not sufficiently demonstrated. TheproposedAction ismatureandhasgood impact.How-ever,thequalityoftheproposedActionislowanditdoesnot provide a convincing case to ensure a harmonisedapproach.
The Action concerns studies and works in the fields oftrafficmanagement(TM)andsupportingsystems.Bringing
together fiveMember States and 10 national/regional roadauthorities, theActionaimstodevelopharmonisednationalandcross-borderTMplansandimplement interoperableITSdeploymentsinfourapplicationareas:improvedtrafficcontrolsystems,extendedTMmeasures,HGVservicemanagement,TMinformation.
2012-EU-50004-P
ITS-EETSMember States involved:Spain, France, Ireland, Portugal, United King-dom
Applicant:UK Department for Transport
Requested fundingTotal eligible costs €190,229,433.77
TEN-T requested funding: €38,045,886.75
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The CITIES+ partners aim at deploying strategic ITS services to enhance interfaces between urban/interurban networks and TEN-
T roads. Truly devoted to reduce bottlenecks, these implementations have been selected during the elaboration phase with regard to their compliance with the TEN-T call, their impact on traffic fluidity and the potential for replication. When appropriate, the CITIES+ partners will take existing ITS standards such as DATEX2, Mare Nostrum and the EasyWay 2012 Deployment Guidelines into account in order to foster interoperability and service harmonisation on crucial stretches. Interactions and collaborations should be considered in addition to the scope of road network since public transport and other alleviating measures such as buses and High Occupancy Vehicles (HOV) lanes, traffic management for large events or integrated and/or connected traveller information services.
TheproposedAction is relevant to the call for propos-alsasitaddressesoneoftheimportantdomainsofITS,namelytheurban/inter-urbaninterface.ThematurityoftheproposedAction isgoodas it is ready tostartandhasalreadypartiallystartedsomedeploymentactivities;nationalpoliticalcommitmentisevidencedandfinancialresourcesarecommitted.However,theconcreteimpactsarepoorastheinvolvementoftherelevantstakeholdersisnotdemonstrated.Thequalityislow.
2012-EU-50003-P
CITIES+
ITS-EETSMember States involved:Spain, Belgium, Germany, France, Italy, The Netherlands
Applicant:Dirección General de Tráfico
Requested fundingTotal eligible costs €58,250,500
TEN-T requested funding: €11,650,100
TEN-T funding: 20%
Recommended funding €0
144
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheActionaimstoimprovecross-bordertrafficandtrans-port through harmonised and synchronised deployment
of ITS applications on the high level road network of eightMember States. The applications relate to traffic manage-ment and traveller information services including safetycriticalroadservices,trafficstatusinformationandtruckpark-ing availability. TheAction also aims to foster the develop-mentofcross-bordertrafficmanagementplans.Theproposalcoversfourworksactivitiesonharmonisation,datacollectionandprocessing,dataexchange,andservicedelivery—withtheprimaryfocusbeingdatacollection.
TheproposedActionisrelevanttothecallorproposalsandtheobjectivesoftheITSDirective.However,itisnotsufficientlymatureduetorisksofaninstitutionalnature.Thepotentialimpactisweak.Intermsofquality,thepro-posedAction ispoorlydescribedandthedescriptionofactivitiesisinsufficientlydetailed.
2012-EU-50006-P
CROCODILE
ITS-EETSMember States involved:Austria, Czech Republic, Germany, Hungary, Italy, Romania, Slovenia, SlovakiaApplicant:Bundesministerim für Verkehr, Innovation und Technologie (AT)
Requested fundingTotal eligible costs €148,772,500
TEN-T requested funding: €29,754,500
TEN-T funding: 20%
Recommended funding €0
MAGNA GRAECIA
The proposed Action’s relevance is good even thoughitfailstoaddressthespecificobjectivesofthecallforproposals.TheproposedAction is immature,no formalendorsementisprovidedbytwoinvolvedMemberStates,nor support by key stakeholders. The socio-economicimpactisverygenericandnotsufficientlydetailed.Thequality of the proposed Action isweakened by lack ofdetaileddescriptionandconsistencybetweentheactivi-tiesandobjectives.
The proposal objective is to provide traffic and travel information and traffic management services to end users
at the same level and quality in Italy, Greece and Cyprus by means of website, VMS, FM radio, navigation services or pos-sible mobile applications. All systems will be harmonising the information based on DGs and will make it available to end users by a common information platform and signals.
2012-EU-50007-P
ITS-EETSMember States involved:Greece, Italy, Cyprus
Applicant:Greek Ministry of Development, Competitiveness, Infrastructure, Transport and Networks (General Secretary of Public Works)
Requested fundingTotal eligible costs €7,930,000
TEN-T requested funding: €1,586,000
TEN-T funding: 20%
Recommended funding €0
145
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Chameleon
TheproposedAction ishighly relevantand in linewiththecallforproposals.Whilstithasalreadystarted,itismissingarealistictimelinewithastrategicroll-outplan.TheproposedActionhasthepotentialtomakeavaluablecontributiontotheroll-outofEuropeancoreservicesandtheDeploymentGuidelinesandSpecifications.However,this is not sufficiently demonstrated. Additionally, theunbalanced participation of key stakeholders and thelackofsubstantiationofthecontinuityofservicesraiseconcernsaboutitsimpact.Overallthequalityispoor.
The proposal, including five Member States (Austria,Switzerland,Germany,France,Italy,TheNetherlands)and
Switzerland, aims to fill the identified gaps in traffic man-agement measures on a corridor area ranging from TheNetherlands (regionofRotterdam) to Italy,develop interna-tionaltrafficmanagementplansandprovideanopentravellerinformationplatform.
2012-EU-50010-P
ITS-EETSMember States involved:Germany, Austria, France, Italy, The NetherlandsApplicant:Bundesministerium für Verkehr, Bau und Stadtentwicklung (DE)
Requested fundingTotal eligible costs €183,098,508
TEN-T requested funding: €36,619,702
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The Action proposes to deliver a coordinated deployment of 18 traveller information services (including one at a cross-
border section) and nine travel time services (two at cross-border sections) on a 13,000 km route on the Mediterranean Corridor connecting the road networks of France, Spain, Italy and Portugal.
TheproposedActionisrelevanttothecallforproposalsand is techinically and financiallymature as it has allthenecessarysupport.Thepotentialimpactsareunder-mined by failing to demonstrate any overarching logicto the integrationof thespecificplanneddeployments.Intermsofquality,theactivitiesarenotclearlydefinedand it fails to demonstrate the European added valuethrough its execution. The proposed corridors are notsufficiently defined and whilst it includes three cross-bordersections,amoreinclusiveandtargetedselectionofcrossbordersectionsalong theproposedcorridor ismissing.
2012-EU-50008-P
MedTIS
ITS-EETSMember States involved:France, Spain, Italy, Portugal
Applicant:Association des sociétés françaises d’autoroutes (ASFA)
Requested fundingTotal eligible costs €164,150,500
TEN-T requested funding: €32,830,100
TEN-T funding: 20%
Recommended funding €0
146
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Corridor du Soleil is a deployment project aiming to imple-ment traffic management services on a north-south TEN-
T road axis from Amsterdam to Nice, passing through The Netherlands, Belgium and France. It aims at:
•Optimising the existing infrastructure capacity and effi-ciencyonsensitive roadsegments,namelyon roadnet-worksuptosemi-urbanareasandcongestedhotspots.
•Improving the safety and reliability with deployment ofsafety measures and supporting systems at criticalhotspotsandatbottlenecks.
TheproposedActionisonlybroadlyrelevanttothecallforproposaIsismaturealthoughimportantcommitmentfromthecitiesinvolvedisnotprovided.TheinvolvementandroleoftheprivatesectortorolloutcoordinatedITSservicesisnotsubstantiated.Thepotentialimpactislowandnotsufficientlyjustifiedintermsoftraffic,environ-ment,regionaldevelopmentandlanduse.Thequalityispoorasitfallsshortofdemonstratinghowaseamlessandcontinuousservicewillbedelivered.
2012-EU-50012-P
Corridor du Soleil
ITS-EETSMember States involved:France, Belgium, The Netherlands
Applicant:Ministère de l’écologie, du développement-durable et de l’énergie (FR)
Requested fundingTotal eligible costs €97,854,000
TEN-T requested funding: €19,570,800
TEN-T funding: 20%
Recommended funding €0
Forcing a breakthrough for use of LNG in maritime shipping
The proposed Action is mature and of good quality.Although theAction representsagood initiative, ithasgot limited relevance to the call for proposals, as it isconsidered a commercial case only for one port andoneprivatemaritimeoperator,withoutwider relevanceto MoS, thus undermining its relevance. The potentialimpactsoftheActionarenotdemonstratedorsubstanti-ated.
TheActionaimstobreakthedeadlockofusingLNGasamarinefuel,byco-developingdemandandsupply,toiniti-
ateitsuse.AnthonyVeder(NL)isbuildingtwonewsea-goingLiquefied Ethylene Gas carriers powered by LNG for SABIC(SittardNL/TeesportUK).ThesecarrierswilltransportethylenefromSABIC’splantinTeesport(UK)toclientsintheSECAarea,andthuscreatingademandinalloftheseports.
Chive Fuels (UK) will co-develop a LNG bunker facility at Teesport, in order to overcome the problem linked to the avail-ability of LNG as a bunker fuel.
2012-EU-21004-P • Part of Priority Project 21
MoSMember States involved:The Netherlands, United Kingdom
Applicant:Anthony Veder Rederijzaken B.V.
Requested fundingTotal eligible costs €12,389,958
TEN-T requested funding: €3,746,947
TEN-T funding: 30.24%
Recommended funding €0
147
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
LNG in Baltic and Black Sea Ports
TheproposedActionisrelevanttothecallforproposalsandthoughtechnicallyitisreadytostartthisissubjecttootherexternalparametersthatmayhavean impacton the implementation timeline. The proposed Actionfails to demonstrate its impact as a decision or policymakingtool.Therearesignificantweaknessesconcern-ingthequalityoftheproposedActionrelatedtothelackofdetailedinformationandclarity.
2012-EU-21012-S • Part of Priority Project 21
The key idea behind this project proposal is to provide the effec-tive and successful implementation of the Motorways of the Sea
in the Baltic and Black Sea regions. The Action is composed of six activities with the main goal to initiate the planning and safety proce-dures, related to the development of LNG infrastructure in the Baltic Sea ports (Trelleborg, Sundsvall, Gdańsk/Gdynia), so that the number of Baltic ports planning the LNG infrastructure will be enlarged, thus creating a network of LNG ports in the region. The planning procedures will also be initiated in another two ports (Burgas, Varna) in the southeastern part of the EU.
The major expected result is the development of a platform, knowl-edge transfer and close cooperation between the in terms of LNG more experienced Baltic Sea and less advanced Black Sea regions.
MoSMember States involved:Sweden, Bulgaria, Poland
Applicant:Trelleborgs Hamn AB
Requested fundingTotal eligible costs €1,156,539.58
TEN-T requested funding: €485,941
TEN-T funding: 42.02%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The Action refers to research studies which will focus on the technical solutions and environmental and cost saving is-
sues for the development of a waterborne transport system that connects short sea shipping with Inland Waterway Shipping and has an independent ice navigation capability without icebreaker assistance.
The intermodal system is expected to be suitable for short sea shipping in the Baltic Sea Motorway on frozen sea routes, as well as for frozen northern European inland waterways.
TheproposedActionhasalowrelevancetothecallforproposalsasitfocusesonresearchrelatedactivitiesthatfalloutsidethescopeofMoS.ThematurityoftheActionissufficient.However,theproposalfailstodemonstrateits impacts as a future decision-making tool and as apolicymakingtool.Theproposalisofpoorqualityasitlacksacoherentapproachinitsstructureandobjectivesandfailstoprovidedetaileddescriptionofitsactivities.
2012-EU-21005-S • Part of Priority Project 21
Towards Round-the-Year Winter Navigation without Icebreaking
Assistance (TRYNICE)
MoSMember States involved:Finland, Estonia
Applicant:VTT Technical Research Centre of Finland
Requested fundingTotal eligible costs €1,163,090
TEN-T requested funding: €581,545
TEN-T funding: 50%
Recommended funding €0
148
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The ATLANTICA OPTIMoSTerminals implementation project which aims to optimise port operations by developing infrastruc-
ture and facilities “ad hoc” to provide efficiency in a “door to door” approach of the MoS service for maximum efficiency and com-petitiveness. In 2009, the Spanish-French Intergovernmental Commission selected two projects: Gijon-St Nazaire and Vigo-Nantes (extended to Le Havre and Algeciras).
ATLANTICA MoS was established in 2009, without having entered into service, both countries governments and the ports involved bets to launch its beginning, which is forecasted before the end of 2013 and thus to provide a high quality service, alternative to the road in freight transport. OPTIMoSTerminalsisasetoftwoimplementationprojectstooptimiseMoSportterminals.BothworksarecompletelyindependentoftheotherbutthetwotogetherwillimproveefficiencyandqualityofMoSservicesinports.
The proposed Action is not relevant to the call forproposalsas there isnomaritimeservicebetween thetwoportsinvolved.Noristhereanyevidencethatamari-timelinkwillbeestablished.Someoftheproposedactiv-itesarematurebutothersarenot.Thepotentialimpactisnotdemonstrated.Thereisnomarketanalysisorotherevidencesubstantiatingtheexpectedtrafficgrowthandnoinvolvementofamaritimeoperator.Thequalityoftheproposalisweak.
2012-EU-21014-P • Part of Priority Project 21
ATLANTICA OPTIMoSTerminals
MoSMember States involved:Spain, France
Applicant:Organismo Público Puertos del Estado
Requested fundingTotal eligible costs €18,408,028
TEN-T requested funding: €3,681,606
TEN-T funding: 20%
Recommended funding €0
Magellano 2020 – green incentives for MoS based
corridors
The proposed Action only broadly addresses therequirements of the call for proposals in terms ofrelevance.Itismature,howeverthelackoftheappropriatebeneficiariesinallproposedpilotactionsisanissue.Theimpactshavenotbeenproperlypresentedandquantified.Intermsofquality, it isambiguous in itsstructureandlacksamethodologicalapproachforitsimplementation.Theinterrelationbetweenthepilotactions,theactivitiesandtheobjectivesoftheActionisnotdemonstrated.
The strategic goal of the Action is to develop a new approach towards a full implementation of a pan-European green cost-efficient incentive scheme
for MoS-based cargo corridors for a clean and environmental friendly logis-tics industry. Different schemes will be included in the same methodological framework, attracting stakeholders and creating expectations and consensus — with a considerable focus and effort in terms of communication and capi-talisation. The Action aims to:
•Defineacommontrans-Europeanconceptualapproachtogreenincen-tivestobeappliedinthedifferentcontexts.
•Implement,demonstrateandevaluatethreepilotsonMoS-basedinter-modalcorridorsintheEU:Mediterranean,AtlanticandBaltic
•Startupaparticipatoryandconsensusbuildingapproachwithhighlevelexpertstakeholdersandshareholders
•Create expectations and consensus, and disseminate/exploit themainmessagescomingfromtheAction.
2012-EU-21015-S • Part of Priority Project 21
MoSMember States involved:Italy, Spain, Finland
Applicant:Rete Autostrade Mediterranee S.p.A.
Requested fundingTotal eligible costs €3,547,012
TEN-T requested funding: €1,773,506
TEN-T funding: 50%
Recommended funding €0
149
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TrainMoS 2
TheproposedAction ismatureandrelevant to thecallfor proposals as a wider benefit action focusing oneducationalaspectsofLNGbunkering.Howeveritlacksconvincingargumentationregardingitsimpactintermsof decision and policy making tools. The quality hasserious deficiencies as the proposed Action does notfollowtheInternationalMaritimeOrganisationguidelinesformaritimecoursedevelopment.
2012-EU-21018-S • Part of Priority Project 21
TrainMoS 2 is a wider benefit Action introducing the humanelementinMotorwaysoftheSeabyestablishingaknowledge
platformandasetofuniversityandvocationalcoursesfocusingonLNGbunkering.Thespecifictoolsthatwillbedevelopedare:
•AsetofLNGpostgraduateuniversitycourses•AsetofprofessionaltrainingsinfiveEUcities•Crossfertilisationactivities(onsitededicatedvisitsrelatedtoLNGbestpractice)
•A set of LNG vocational educational activities (in ports/onboard)
•An enlarged LMS platform including mobile phone/tabletapplications
•AnenlargedLNGcontentofawebportal
MoSMember States involved:United Kingdom, Greece, Spain, Italy, Poland, PortugalApplicant:University of Strathclyde
Requested fundingTotal eligible costs €2,548,696
TEN-T requested funding: €1,274,348
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action will improve capacity, productivity and environmental performance of the Trelleborg-Swinoujscie mari-
time link. It will contribute to sustaining the competitiveness and attractiveness of related multi-modal and international transport chains linking the Nordic and continental European countries.
In regards to Eastern European related traffic development, i.e. those connected to the pre-defined TEN-T corridor 1 between Southern Sweden and Poland have experienced a strong growth over the last few years (+14% per year since 2007). The proposed Action will ensure adequate maritime capacity and efficiency to sus-tain this freight transport demand. In particular, unitised cargo traffic on routes between Scandinavia and Eastern/Central/ Southeast Europe have large growth potential — also as intermodal transport. Activities involve maritime access, on-shore power supply, intermodal capacity, IT tools and a market study.
PartoftheactivitiesoftheproposedActionarealreadyco-financed by the EU. The remaining activities are oflowrelevancetothecallforproposals.Itisverymatureas activities have alread started or are ready to start.Theimpactislimitedanddoesnotappeartobesignifi-cant.Thequalityisweakinparticularregardingprojectmanagementaspects.
2012-EU-21016-P • Part of Priority Project 21
Improvement of multi-modal transport and sea-based link
Swinoujscie-Trelleborg
MoSMember States involved:Sweden, Poland
Applicant:Trelleborgs Hamn AB
Requested fundingTotal eligible costs €22,996,742
TEN-T requested funding: €4,543,670
TEN-T funding: 19.76%
Recommended funding €0
150
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action aims at enabling the supply of LNG from the Tornio import terminal, located between Finland and Sweden, to
multimodal satellite terminals at the Bay of Bothnia and facilitate the uptake of LNG in maritime transport. The Action aims at support-ing the development of cleaner and economically viable transport of North Scandinavian raw materials and industrial products to Euro-pean and international markets. The main components are the ongo-ing pre-investment studies for the construction of the LNG import terminal in the port of Tornio, conceptual and basic design of a new 1A super ice-strengthened LNG import tanker, establishment of bun-kering and multimodal reloading facilities at the Tornio-Haparanda multimodal LNG terminal, as well as the multimodal satellite ter-minal in Raahe, at the Bay of Bothnia. The Bothnian LNG transport infrastructure will be piloted through bunkering exercises in a small number of ports.
The impactof theproposedAction isgood.Whilst it isrelevant from a policy perspective, it is not sufficient-ly relevant to the specifics of the call for proposals.Moreover,theinterdependencybetweenworksandstud-ies within the same Action undermine significantly itsmaturity.Significantstepsneedtobecompletedbeforeit can be considered sufficientlymature. The quality isnotsatisfactoryasthedescriptionlackstechnicaldetails.
2012-EU-21022-P • Part of Priority Project 21
BothniaLNG
MoSMember States involved:Finland, Sweden
Applicant:The Baltic Institute of Finland
Requested fundingTotal eligible costs €51,124,600
TEN-T requested funding: €15,103,050
TEN-T funding: 29.54%
Recommended funding €0
SEAPLANES-SEE: Seaplanes dossier and tender for South-
east Europe operations
The proposed Action is not relevant to the call forproposals as itwill not lead to concentration of trafficflows onmaritime based logistical routes. There is noevidenceofquantifiablesocio-economicimpactatmacrolevel. It isnotmature,there isnoevidenceofcommit-mentsfortheintroductionofseaplanesintheregion.TheActionisacommercialventure.Overallthequalityisveryweak.Theproposalisnotcoherent,itsactivitiesarenotsufficientlydescribed.
SEAPLANE-SEE foresees to deliver a “complete tenderdossier” (study) addressed to (and of practical use by)
“investors”andtheEuropeanInvestmentBank(EIB),towardsinitiating a profitable business in 2015 on SEE seaplaneoperations (Adriatic & East Mediterranean Continuum). TheAction addresses issues of wider benefit for MoS linked toseaplaneoperationsinSEE,presentsamatureMoSseaplaneprogrammereadyfor fundingby investors,and releasesaninternationaltenderforinvestors(consortia,PPP).
2012-EU-21024-S • Part of Priority Project 21
MoSMember States involved:Greece, Italy
Applicant:Epsilon International SA.
Requested fundingTotal eligible costs €1,660,000
TEN-T requested funding: €830,000
TEN-T funding: 50%
Recommended funding €0
151
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
The proposed Action continues previous measures tocomplete the Global Project (Priority Project 17) on the
Munich-Bratislavasub-section.
Itwill tackletheconnectionHubertendorf–Blindenmarkt (viaBurgstallertunnel), which is one of the remaining works tocomplete theYbbs-Amstettenstretch. Itaims to removeanidentifiedbottlenecktoenableaconsistent,four-trackopera-tionrequiredononeofthemostimportantsubsectionsalongPriorityProject17,Wels-Vienna.
PP17: Austrian part in sub-section Munich–Salzburg, Salzburg–Vienna, Vienna–Bratislava - gap closure be-tween Hubertendorf and Blindenmarkt (via Burgstall-ertunnel) to enable the required four-track operation
for Ybbs–Amstetten
2012-AT-17034-P • Part of Priority Project 17
PPs - New ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested fundingTotal eligible costs €67,848,931.34
TEN-T requested funding: €13,569,786.27
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedActionisrelevanttothecallforproposalsasitaddressesamissinglinkonthePriorityProject17.Itsmainstrengthis itsmaturityastheimplementationhasalreadystarted.Intermsofimpact,theeliminationof the bottleneck on the respective sectionwill enableobtainingfullsocio-economicbenefitsfromtheimprovedtrafficcapacityofthewholeaxis.Theoverallqualityoftheproposal is good.However, taking intoaccount thescarcityoffundsandinlinewiththecallpriorities,sup-porttothisActionwouldnotoptimisetheeffectivenessoftheTEN-Tfunding.
TheproposedAction ispartoftheGlobalProjectwhich isthe development of the Austrian part of Priority Project
17,RailwayaxisParis-Strasbourg-Stuttgart-Wien-Bratislava.It includes design studies leading to the implementation ofthemissinglinkSalzburg-Steindorf/Straßwalchen.
PP17: Austrian part in sub-section Munich–Salzburg, Salzburg–Vienna, Vienna–Bratislava - design study leading to and Environmental Impact Assessment necessary for the implementation of the Salzburg-
Steindorf/Straßwalchen gap closure
2012-AT-17100-S • Part of Priority Project 17
PPs - New ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested fundingTotal eligible costs €8,581,400
TEN-T requested funding: €4,290,700
TEN-T funding: 50%
Recommended funding €0
152
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action is very relevant to the call forproposals since it aims to improve the capacity on asectionofPriorityProject17.However,theActionisnotmatureenoughasitisnotreadytostartfromtechnicalpointofview.TheimpactoftheActionhasnotbeendemon-strated.Moreover,thequalityoftheproposalisonlyfairasessentialinformationwasnotprovided.
Theproposalconcernstheupgradingofa+/-4.5kmrail-waysectionbetweenViennaStadlauandViennaAspern.
It is part of theGlobal Project for theupgrade toadoubletrackelectrifiedlineonthenorthernsectionofPriorityProject17 (Vienna–Slovak border). The proposedworks, which aimtoincreasethecapacity,safetyandservicequalityalongtheline,arepreliminaryconstructionmeasuresandconstructionofretainingwallsforthenewrailwayembankment.
Upgrading Wien-Stadlau – Wien-Aspern
2012-AT-17108-P • Part of Priority Project 17
PPs - New ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested fundingTotal eligible costs €25,252,000
TEN-T requested funding: €5,050,400
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedActionisrelevantasitaimsatremovinganexistingbottleneckthusimprovingthecapacityofPriorityProject17.TheActionisverymaturesincetheworkshavealreadystarted.Therearesocio-economicimpactsthroughtraveltimesavings.Thequalityoftheproposalisgood.However,takingintoaccountthescarcityoffundsandinlinewiththecall’spriorities,supporttothisActionwouldnotoptimisetheeffectivenessoftheTEN-Tfunding.
TheproposalconcernstheintegrationofthreerailwaylinesoftheFreilassing-Salzburgcross-bordersectionintoSalz-
burg’smaintrainstation.TheActionaimstoeliminateabottle-neck,thusprovidingadequateinfrastructurefortheincreasedcapacityrequirementsalongPriorityProject17,RailwayaxisParis-Strasbourg-Stuttgart-Wien-Bratislava.TheworksconsistoftrackandplatformconstructionwiththenecessarysignallingadjustmentsintheSalzburgstationarea.
PP17: Austrian part in sub-section Munich–Salz-burg, Salzburg–Vienna, Vienna–Bratislava -
integration of the three tracks from Freilassing–Salzburg into Salzburg Main Station
2012-AT-17106-P • Part of Priority Project 17
PPs - New ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested fundingTotal eligible costs €108,915,300
TEN-T requested funding: €21,783,060
TEN-T funding: 20%
Recommended funding €0
153
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedAction is relevant to the call for propos-als, has started and is of good quality. However, itscomparativeEUaddedvalueislowbecauseofthelocaldimensionofworks.Moreover,itisclosetothebordersbut no significant impact is expected until it becomesalsoapriorityfortheneighbouringMemberStates.
The Action concerns works to modernise and increase the capacity of railway lines 15 and 19 of the Belgian part of
the Iron Rhine, from the Dutch-Belgian border (Hamont) to Lier. The following works are foreseen:
•Conversionoftherailwayconfigurationandinstallationofpassingtrack/looplineforfreighttrainsinNeerpelt
•Eliminationoflevelcrossings61bisinNeerpeltand62inOverpelt
•Electrificationworksonline15Herentals-Mol•WorkstoenablethecommissioningoftheHamontstop-pingpoint
•Renewalofoutdatedsignallinginstallations
Works for Rail Freight Corridor 8 in Belgium: electrification works Herentals-Mol, transformation track configuration Neerpelt, re-opening the train
stop at Hamont, upgrading existing signalling technology
2012-BE-24103-P • Part of Priority Project 24
PPs - New ActionMember States involved:Belgium
Applicant:Infrabel SA
Requested fundingTotal eligible costs €40,220,027.26
TEN-T requested funding: €8,044,005.46
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action is mature and of good quality.However,itisnotrelevanttothecallforproposalsasitspredominant part concerns train stations therefore theremainderoftheActionisoflimitedEUadedvalue.
This Action concerns the first phase of the works to elimi-nate a bottleneck on the section between Watermael
station and the Louvain-la-Neuve junction, part of PriorityProject28,“Eurocaprail” on the Brussels-Luxembourg-Strasbourg railway axis.
Theworksinclude:•Wideningtherailplatform,adaptingand/or renewingtheengi-neeringstructuresfromWatermael-BoitsforttoOttignies
•Redeveloping the stations and stops at Watermael, Boitsfort,Groenendael,Hoeilaart,LaHulpe,Genval,Rixensart,ProfondsartandOttignies
•Finishingworks•InstallingenvironmentalequipmentalongthelinesL161,L161A
Increasing the number of tracks to 4 on the 161 line
between Watermael and the Louvain-la-Neuve junction
2012-BE-28102-P • Part of Priority Project 28
PPs - New ActionMember States involved:Belgium
Applicant:Infrabel SA
Requested fundingTotal eligible costs €259,581,686.58
TEN-T requested funding: €51,916,339.32
TEN-T funding: 20%
Recommended funding €0
154
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedAction is relevant to the call for propos-als, of good quality and significant expected imapct.However,interdependencyofworksandstudiesimplyahigh risk for the timely implementation of this Action,reinforcedevenfurtherbytheplannedbulkofexpendi-ture in the end of the period stipulated in the call forproposals.
ThisActionconsistsofworksrelatedtothenewdualtrackline from Copenhagen to Ringsted via Køge, including a
newstation in thenorthernpart ofKøge. It foreseesmajorworkswhich include, interalia,theextensionoftheexistingAvedøre Havnevej bridge, the construction of two railwaytunnels, six bridges, structures for fauna passages, a roadpassingovertheHolbækMotorway,railwaytunnelunderthemotorway;aswellasenvironmentalworkandutilityreloca-tions,projectmanagementandlandacquisition.
New railway line Copenhagen-Ringsted (works) - upgrading the railway access lines to the future
Fehmarn Belt fixed link
2012-DK-20011-P • Part of Priority Project 20
PPs - New ActionMember States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested fundingTotal eligible costs €667,347,121
TEN-T requested funding: €133,469,425
TEN-T funding: 20%
Recommended funding €0
TheproposedAction is relevant to the call for propos-als, of good quality and significant expected imapct.However,interdependencyofworksandstudiesimplyahigh risk for the timely implementation of this Action,reinforcedevenfurtherbytheplannedbulkofexpendi-ture in the end of the period stipulated in the call forproposals.
The Action consists of the construction of part of theFehmarnrailwayhinterlandconnectionsinDenmark(Pri-
ority Project 20). The current road bridges on Lolland andFalsterwillberaisedorreplaced,afairwayinStorstrømmensouthofMasnedøwillbeestablishedandanewplatformatVordingborgStationwillbeconstructed.Demolitionofbuild-ingsandnoiseprotectionofexistingbuildingswillbeinitiated.Furthermore,theacquisitionoflandnotincludedintheActionwilltakeplace.
Upgrading the Ringsted-Rødby section (works) - upgrading the
railway access lines to the future Fehmarn Belt fixed link
2012-DK-20014-P • Part of Priority Project 20
PPs - New ActionMember States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested fundingTotal eligible costs €57,254,437
TEN-T requested funding: €11,450,887
TEN-T funding: 20%
Recommended funding €0
155
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €59,000,000
TEN-T requested funding: €11,800,000
TEN-T funding: 20%
Recommended funding €0
TheproposedAction is relevant to the call for propos-als as it is linkedwith Priority Project 3. However, theproposal suffers from a low maturity as it failed todemonstratethatithasreceivednecessarysupportandsomepreparatorystepshavenotyetbeentakenwhichundermines its readiness tostart.Similarly, the impactoftheActionproposedisonlydescribedinagenericwayandbasedonoutdateddata.Thequalityoftheproposalislowaskeyinformationisnotprovided.
The Global Project consists of an international gaugeconnection from the Port of Barcelona to the French
borderalongtheMadrid-Barcelona-Frenchborderhighspeedrail line,allwithin theframeworkofPriorityProject3 (Highspeed railwayaxis of southwest Europe). The proposedAc-tioninvolvestheconstructionofanewrailwayaccesstotherecentlybuiltPratpierwithitsnewTercat-HutchisoncontainerterminalinthePortofBarcelona.
New south railway access to the Port of Barcelona. Phase 1.
2012-ES-03101-P • Part of Priority Project 3
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The Action is relevant to the call for proposals andthe TEN-T priorities as it addresses a bottleneck onPriorityProject20.Itsmaturityandqualityareverygood.However, theoutputof thisActionwillnot lead imme-diatelytophysicalimplementationthusunderminingitsexpectedimpact.Therefore,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupport to thisActionwouldnotoptimise theeffectivenessofTEN-Tfunding.
TheActionconcernsstudiesfortheconstructionofanewStorstrømBridgeofabout3.9km,partoftheFehmarnBelt
railwayaxis(PriorityProject20).Theyincludetheenvironmentalimpactassessment,conceptualdesignandpreparationoftheconstructionactforanewbridge.
New Storstrøm Bridge (studies) – upgrading the railway access line
to the future Fehmarn Belt fixed link
2012-DK-20027-S • Part of Priority Project 20
PPs - New ActionMember States involved:Denmark
Applicant:Banedanmark (Rail Net Denmark)
Requested fundingTotal eligible costs €30,041,000
TEN-T requested funding: €15,020,500
TEN-T funding: 20%
Recommended funding €0
156
Evaluation remarks Evaluation remarks
NOT RECOMMENDED FOR FUNDINGNOT RECOMMENDED FOR FUNDING
The proposed Action is very relevant to the call forproposals as it addresses the bottleneck on PriorityProject 8. As part of the Global Project, the impact oftheActionisverygood,includingpositivesocio-economicbenefitsfromtheimprovedaccessibilityoftheinvolvedregions.Overalltheproposalisofgoodquality,realisticandconsistentfromatechnicalpointofview.However,the Action is in advanced stage of implementation sothattheleverageofEUfundingislimited.
The Action consists of the construction of a high speedrailway platform on the Vigo-Santiago de Compostela
section along Priority Project 8 (Multimodal axis Portugal/Spain-restofEurope).Itsfollowupservicesarealsoincluded.Thesectionwillbeequippedwithtwo,electrifiedUICtracks,setforamaximumdesignspeedof250km/h.TheActionalsoincludestheconstructionof21viaductsand18tunnels.
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €226,945,517
TEN-T requested funding: €45,389,104
TEN-T funding: 20%
Recommended funding €0
Platform works on the Vigo–Santiago de Compostela
section
2012-ES-08094-P • Part of Priority Project 8
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €197,094,612
TEN-T requested funding: €39,418,922
TEN-T funding: 20%
Recommended funding €0
The proposed Action is very relevant to the call forproposals as it concerns works for the removal of abottleneckalongPriorityProject8.It ismatureanditsimpactisimportantinthecontextoftheGlobalProject.Thequalityoftheproposalisalsogood.However,thereareuncertaintiesinconnectionwiththetechnicalscopetobeachievedby2015.ConsideringthisinconjunctionwiththescarcityofEUfundssupporttothisActionwouldentailasuboptimaluseofTEN-Tfunding.
Theproposal consists of theworks for the installationoftrack, electrification, signalling, telecommunications and
civil protection facilities, aswell as the services for follow-up of the construction on the 156 km long Vigo-A CoruñasectiononSpain’snorth/northwestrailcorridor,partofPrior-ityProject8(MultimodalaxisPortugal/Spain-restofEurope).
Supply, track assembly, electrical, signal-ing, telecommunications and civil protec-tion facilities and services for follow-up on section Vigo–A Coruña. Eje Atlántico
Alta Velocidad
2012-ES-08095-P • Part of Priority Project 8
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
157
TheproposalconcernsstudiestoidentifyandevaluatetheworksneededtoupgradePriorityProject16(Freightrail-
way axis Sines/Algeciras-Madrid-Paris). Specifically, they in-cludethenecessaryanalysisoftheexistinginfrastructureanddevelopment plans fromSpain, France and Portugal— thecountriesthroughwhichthelinepasses.Astudyofthetrafficdemand,volume,typeandcostofserviceswillalsobeper-formedandaforecastfordifferentscenarioswillbeestimateduntil2050.
The quality of the proposal is good. However, theproposed Action has a low relevance to the call forproposalsasitconcernsapre-feasibilitystudyanddoesnotdemonstratehowitwillleadtoimplementation.ThematurityoftheActionisnotdemonstratedgiventhatitremainsunclearwhethertheActionhasreceivedneces-sary supportwhile key preparatory steps have not yetstarted.Itsimpactasdecisionmakingtoolhasnotbeensubstantiated.
2012-ES-16029-S • Part of Priority Project 16
Technical actuations for the optimi-zation of freight railway axis Sines/
Algeciras-Madrid-París (PP16) and the planning on the Spanish existing part
Airport link Tenerife north-south with an innovative and modern
railway system (Maglev)
TheproposedAction is onlymarginally relevant to thecall for proposals and it is not related to any PriorityProject. TheAction is notmature, as it is not ready tostartfromatechnicalpointofview.ThepotentialimpactoftheActionhasnotbeendemonstratedanditsqualityisnotsound,asitlacksdetailsandclarity.
2012-ES-14016-S • Part of Priority Project 14
The proposal concerns the feasibility and design studiesnecessaryfortheimplementationofa65kmnorth-south
railwaylinebasedonamaglevsystem(trans-rapidmagneticlevitation railway), linking the two airports of the island ofTenerife.
This transport solution comprising a modern and attractive rail link is required in addition to the north-south motorway, in order to take the strain off the latter and to improve overall links between the north and south. A trans-rapid maglev could provide a solution for a rapid transfer link between the two airports, and serve as an additional tourist attraction.
PPs - New ActionMember States involved:Spain
Applicant:Fundacion Transpirenaica-Travesia Central del Pirineo
Requested fundingTotal eligible costs €1,200,000
TEN-T requested funding: €600,000
TEN-T funding: 50%
Recommended funding €0
PPs - New ActionMember States involved:Spain
Applicant:Cabildo Insular de Tenerife
Requested fundingTotal eligible costs €1,000,000
TEN-T requested funding: €500,000
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
158
PPs - New ActionMember States involved:Spain
Applicant:Sociedad Estatal de Infraestructuras del Transporte Terrestre, S.A.
Requested fundingTotal eligible costs €219,054,606.89
TEN-T requested funding: €43,810,921.38
TEN-T funding: 20%
Recommended funding €0
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
Theproposalconcernsrailbedworksfortheconstructionofthe30kmlongsectionbetweenCernadilla,Pedralbadela
Praderíaand thePadorneloTunnelalong theMadrid-Galiciahighspeedline,partofPriorityProject19(Highspeedrailin-teroperabilityintheIberianPeninsula).Theworksinvolvetheconstruction of tunnels, false tunnels, viaducts, overpassesandunderpasses.TherailbedisdesignedforadoubletrackUIC gauge, allowing speeds over 350 km/h for passengerservices.
The proposal consists of works for the constructionof the rail bed for the 8 km long Zamora-La Hiniesta
sectionalongtheMadrid-Galiciahighspeedline,partofPrior-ityProject19 (Highspeedrail interoperability in the IberianPeninsula).Theworks includeoneviaduct,one false tunnel,overpassesandunderpasses,aswellastheadaptationoftwoexisting tunnels.The railbed isdesignedforadouble-trackUICgaugeallowingamaximumspeedof350km/h.Thelefttrackwillalsobeequippedwithathirdrail, toallowfreightservicesinIberiangauge.
Madrid-Galicia high speed rail: section Cernadilla-Pedralba de la Pradería-Padornelo Tunnel
2012-ES-19004-P • Part of Priority Project 19
PPs - New ActionMember States involved:Spain
Applicant:Sociedad Estatal de Infraestructuras del Transporte Terrestre, S.A.
Requested fundingTotal eligible costs €44,197,482.26
TEN-T requested funding: €8,839,496.45
TEN-T funding: 20%
Recommended funding €0
Madrid-Galicia high speed mixed traffic rail: section:
Zamora-La Hiniesta
2012-ES-19005-P • Part of Priority Project 19
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
159
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €483,880,600
TEN-T requested funding: €96,776,120
TEN-T funding: 20%
Recommended funding €0
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
TheproposalconcernsworksfortheimplementationofUICgauge in the rail sectionbetweenVandellósandAlmus-
safes,on theMediterraneancorridor,partofPriorityProject19(Highspeedrail interoperabilityintheIberianPeninsula).Itcoversthenecessaryadaptationsonthefacilitiesandele-mentsof the linefor theoperationof750m longtrains inmixedgauge.Theworkswillbecarriedoutalong249kmofdoubletrackand29kmofsingletrackandwillallowtheac-cesstothePortsofValenciaandSaguntoinstandardgauge.
Theproposalconcernsrailbedworksandrelatedfollowupservicesonthe9.55kmlongrailwaysubsectionSanIsidro-
Orihuela,belongingtotheMadrid-CastillaLaMancha-Comuni-dadValenciana-RegióndeMurciahighspeedrailwayline,partofPriorityProject19 (Highspeed rail interoperability in theIberianPeninsula).TherailbedisdesignedfordoubletrackinUICgaugeandamaximumspeedof220km/h.Twoviaductsandatunnelwillbeconstructed.
Implementation of the UIC gauge in the Mediterranean Corridor. Vandellos-Almussafes section.
Phase 1.2012-ES-19042-P • Part of Priority Project 19
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €128,324,445
TEN-T requested funding: €25,664,889
TEN-T funding: 20%
Recommended funding €0
Platform works on subsection San Isidro-Orihuela and
services for follow-up works
2012-ES-19082-P • Part of Priority Project 19
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
160
TheActionconsistsofworksintheNudodelaEncina-Mo-genteandMogente-AlcudiadeCrespínssubsections,along
theMadrid-Levante/MediterraneancorridoronPriorityProject19(Highspeedrail interoperability intheIberianPeninsula).Theworks,foratotallengthof36.3km,coverinteraliatheconstructionoftherailbedforIberiangauge(includingtun-nels and viaducts), installation of tracks (with polyvalentsleepers),electrificationat3kV,aswellassecurityandcom-municationinstallations.Thelineisdesignedformixedtrafficwithamaximumspeedof110km/h.
The maturity of the proposed Action is excel-lent as the works have already started. However, itsrelevance to the call for proposals has not beendemonstrated.Inparticular,itcannotbeestablishedhowthe Aciton will increase interoperability and remove abottleneck,asstated.Subsequently,itsimpactislowandthesocio-economicbenefitsareonlypresented for theGlobalProject.ThequalityoftheproposalisonlyfairasitincludesnokeyinformationontheproposedActionbutratheronwiderandnotrelatedaspects.
Platform works on the Lubian-Tunel de la Canda, Tunel de la Canda-Vilavella and
Tunel de O Cañizo (Via izquierda) subsec-tions and services for follow-up works
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
TheActionconsistsoftheconstructionofthreehighspeedrailway subsection platforms along the Lubián-Ourense
section of the Madrid-Galicia-Portugal high speed rail lineanditsfollowupservices.Thethreesubsectionswillhavetwoseparated platforms, each one equippedwith a single one-way,UICelectrifiedtrack.Thesesectionsaredesignedforaspeedof350km/h.Fourdoubledeckviaductsandfourdoubletubetunnelswillalsobebuilt.
2012-ES-19084-P • Part of Priority Project 19
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €202,259,180
TEN-T requested funding: €40,451,836
TEN-T funding: 20%
Recommended funding €0
Platform and track bed works on the Nudo de La Encina–Mogente and
Mogente-Alcudia de Crespins subsections
2012-ES-19085-P • Part of Priority Project 19
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €59,243,785
TEN-T requested funding: €11,848,757
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
161
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €162,367,076
TEN-T requested funding: €32,473,416
TEN-T funding: 20%
Recommended funding €0
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
TheproposedActionisrelevanttothecallofproposalsandTEN-TprioritiesasitcontributestotheachievementofPriorityProject19.TheActionisverymatureasithasalreadystarted.Itisexpectedtoproducepositiveimpactontheenvironmentbyshiftingtrafficfromroadtorail.Theoverallqualityisgood.However,giventheadvancedstageof implementation the leverageofEUfunding islimited.
LocatedonPriorityProject19(Highspeedrailinteroperabil-ityintheIberianPeninsula),theproposalreferstoworks
on theOlmedo-Zamora-Pedralba de la Pradería high speedrailway line section, along the Madrid-Valladolid-Galicia-Portugalnorth/northwestcorridor.Foreseenactivitiesincludetrackequipmentsupply,assemblyandtransportation,aswellaspowersupply.
LocatedonPriorityProject19(HighspeedrailinteroperabilityintheIberianPeninsula),theproposalcoversworksonthe
Albacete-Alicante section, along the Madrid-Castilla LaMancha-ComunidadValenciana-RegionofMurciahighspeedrailwayline.Foreseenactivitiesincludesupply,trackassem-bly,electrical,signalling,telecommunicationacoustic,environ-mentalprotectivemeasuresandcivilprotectionfacilities.
Supply, track assembly and energy facilities on the Olmedo-Zamora-
Pedralba de la Pradería high speed rail section
2012-ES-19088-P • Part of Priority Project 19
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €194,990,227
TEN-T requested funding: €38,998,045
TEN-T funding: 20%
Recommended funding €0
Supply, track assembly, electrical, signalling, telecommunication acoustic
and civil protection facilities on the section Albacete-Alicante of the high
speed rail line Madrid-Levante
2012-ES-19097-P • Part of Priority Project 19
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
162
The proposed Action consists of the necessary studies tolaunchtherehabilitationandupgradingworksforthetrack
andrelatedinfrastructuresontheZaragoza-Canfranc-Pauin-ternationalrailwayline,partofPriorityProject16(FreightrailwayaxisSines/Algeciras-Madrid-Paris).Theconcernedsectionhasadirecteffectonthecross-bordersectionandareawithina100kmradiusoftheFrench-Spanishborder.
TheproposedActionisrelevanttothecallforproposalasitconcernsstudiesfortheupgradingofacross-bor-dersectionalongthePriorityProject16.TheimpactoftheActionisgoodinlinewiththisoftheGlobalProject.However,thematurityoftheActionislow,asitscriticalpartswill start lateandwill be subject to a very tighttime schedule. Moreover, the necessary joint manage-ment structure has not yet been set-up. Similarly, theproposalisoflowquality.Severaltechnicalandfinancialelementshavenotbeenprovided.
Supply, track assembly and complementary works, electrical, signaling and telecom-
munications facilities on the Mediterranean Corridor railway link LAV Madrid-Barcelona-
French border
The proposed Action is relevant to the call forproposals, very mature and with significant expectedimpact.Itsqualityisalsoverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
The Action consists of the supply, track assembly andcomplementary works — including electrical, signal-
lingandtelecommunicationsfacilities—onthe62kmlongVandellos-Tarragona sectionalong theMediterraneanCorri-dor rail link - LAV (Linea alta Velocidad)Madrid-Barcelona-Frenchborder,partofPriorityProject19(Highspeedrailin-teroperabilityintheIberianPeninsula).
2012-ES-19114-P • Part of Priority Project 19
PPs - New ActionMember States involved:Spain
Applicant:Administrador de Infraestructuras Ferroviarias
Requested fundingTotal eligible costs €201,623,440
TEN-T requested funding: €40,324,689
TEN-T funding: 20%
Recommended funding €0
PPs - New ActionMember States involved:Spain, France
Applicant:Gobierno de Aragón
Requested fundingTotal eligible costs €7,869,524
TEN-T requested funding: €3,934,762
TEN-T funding: 50%
Recommended funding €0
Studies for the adaptation of the existing infrastructures of the in-
ternational Zaragoza-Canfranc-Pau line
2012-EU-16019-P • Part of Priority Project 16
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
163
PPs - New ActionMember States involved:Austria, Germany
Applicant:Kaindl Invest GmbH
Requested fundingTotal eligible costs €73,739,476.40
TEN-T requested funding: €14,747,895
TEN-T funding: 20%
Recommended funding €0
The proposed Action is partly relevant to the call ofproposals,aslongasitconcernsdevelopmentofinter-modalterminals.TherelevantpartsofproposedActionarereadytostart.Itsimpactisdemonstratedinparticu-larwithregardtotheGlobalProject.Thequalityoftheproposalisgood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupport to thisActionwouldnotoptimise theeffectivenessofTEN-Tfunding.
The current container terminal at the Port of Enns has reached its ca-pacity limits of 180,000 movements per year. The ENNS MULTIMODAL
project will develop a modern container terminal with enhanced rail infra-structure, integration of IWW port facilities and an extensive logistics cen-tre of more than 3.5 million m² - making it the largest integrated industrial development area on the upper Danube. The terminal is strategically situated on the upper Danube and especially relevant for Priority Project 17 (Railway axis Paris-Strasbourg-Stuttgart-Wien-Bratislava), Priority Project 22 (Railway axis Athina– Sofia–Budapest–Wien–Praha–Nürnberg/Dresden) and Priority Project 18 (Wa-terway axis Rhine/Meuse-Main-Danube).
The vision is to provide a trimodal cargo transport centre, consisting of an intermodal terminal and a cargo city, which ensures a reduced burden on metropolitan areas, a modal shift from road to rail and IWW, bundling of volumes, reduced cost by centralisation and support for deep sea ports by providing a state-of-the-art hinterland rail terminal.
Connecting Priority Project TEN Axis 17 (rail) with Priority Project 18
(IWW): Priority Project in Sub-Section Salzburg-Wien: ENNS MULTIMODAL
2012-EU-17118-P • Part of Priority Project 17
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
E18 Ring Road III 2nd phase (Airport road)
Given that the proposed works concern a small andexisting section on Piorirty Project 12 the comparativeEUaddedvalueoftheproposalislimited.Moreover,theworkscanstartonlywhentheconstructionplaniscom-pleted,whichputsat risk the timely completionof theworksbyendof2015asstipulatedinthecallforpro-posals.
Theproposal,thesecondphaseofGlobalProject“RingRoadIII”,aimstoimprove8kmoftheE18roadneartheHelsinki
Airport.TheRingRoad III (2km),AirportRoad (1.5km)andTikkurilaRoad(1.5km)willbeimprovedwiththerelatedtwointerchanges,18bridgesandarrangementsforpedestrian/bi-cycletrafficandpublictransport.
TheActionaimstoremoveamajorbottleneck,improvetrafficsafetyandcreateanewroadconnectiontoHelsinkiAirport.
2012-FI-12063-P • Part of Priority Project 12
PPs - New ActionMember States involved:Finland
Applicant:Ministry of Transport and Communications
Requested fundingTotal eligible costs €87,600,000
TEN-T requested funding: €18,030,000
TEN-T funding: 20.58%
Recommended funding €0
164
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
GSM-R Roll-out
TheproposedAction is relevant to the call for propos-alsandhasverygoodmaturity. Ithasstartedand thefinancial resourcesare secured. The impact is goodasthe Actionwill contribute to increasing interoperability,though limited to the GSM-R only. The quality is alsogood. However, since it contributes to interoperabilitythroughthedeploymentofGSM-Ritisoflowerprioritytothecallforproposals.
ThisActionconcernsworkstoreplacetheexistingground-to-trainsystemwithaGSM-Rinteroperableradiosystem,
over 1,410 kmof high speed line (sectionsworked at over250 km/h). Two of the four concerned sections are locatedalongPriorityProject3(High-speedrailwayaxisofsouthwestEurope),onealongPriorityProject2(High-speedrailwayaxisParis-Bruxelles/Brussel-Köln-Amsterdam-London), and thefourthisalooplinearoundParis.
2012-FR-03052-P • Part of Priority Project 3
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested fundingTotal eligible costs €103,478,261
TEN-T requested funding: €23,293,226
TEN-T funding: 22.51%
Recommended funding €0
TheproposalconcernsasectionofPriorityProject12(NordicTriangle railway/roadaxis)motorway connectingHelsinki
totheRussianborder.Theworksconsistofimprovementsof2.8kmofexistingmotorwaybetweenKymenlinnaandRan-tahakathroughthebuildingofnewhighwayrampsandroadconnections,ninebridges(6newand3improved),twointer-changes(1newand1improved),and6kmofnoisebarriersbetweenKarhulaandRantahaka.TheActionaimstoalleviateabottleneck and to improve the safety and reliability of thisroadsection.
Given that the proposed works concern a small andexisting section on Piorirty Project 12 the comparativeEUaddedvalueoftheproposalislimited.Moreover,theworkscanstartonlywhentheconstructionplaniscom-pleted,whichputsat risk the timely completionof theworksbyendof2015asstipulatedinthecallforpro-posals.
PPs - New ActionMember States involved:Finland
Applicant:Ministry of Transport and Communications
Requested fundingTotal eligible costs €32,000,000
TEN-T requested funding: €6,670,000
TEN-T funding: 20.84%
Recommended funding €0
E18 motorway at Kotka
2012-FI-12119-P • Part of Priority Project 12
165
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Located on Priority Project 3 (High-speed railway axis ofsouthwestEurope),theproposalreferstoworksonTours-
Bordeauxsection:300kmofhighspeedrailwaylineand40kmofconnecting lines.Theproposedactivities includecon-structionworksunderaconcessionarrangement,aswellasworks of connecting lines and the central signalling, pointsand power supply facilities (under Réseau Ferré de Franceresponsibility).
TheproposedAction is relevant to the call for propos-als(PriorityProject3),verymatureandwithsignificantexpectedimpact.Itsqualityisalsoverygood.However,taking into account the need to handle the scarcity offundsand in linewiththecallprioritiessupport tothisAction would not optimise the effectiveness of TEN-Tfunding.
Tours-Bordeaux, work for the South Europe Atlantic high
speed line (SEA HSL)
2012-FR-03110-P • Part of Priority Project 3
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested fundingTotal eligible costs €3,624,944,000
TEN-T requested funding: €724,988,800
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
New railway line between Montpellier and Perpignan
The proposed Action is very relevant as it aims toremovea bottleneck onPriority Project 3.However, itsmaturityispoorasthenecessarysupporthasnotyetbeenprovidedandtheprocurementproceduresareundefined.Inaddition, financial resources havenot been committed.The impact cannot be defined as the socio-economicstudy is underway, and the preliminary results are notpresented.Overall,thequalityoftheproposedActionisweakincludingincompleteinformation.
2012-FR-03112-S • Part of Priority Project 3
Located on Priority Project 3 (High-speed railway axis ofsouthwest Europe), the proposal concerns early stage
studies on the new rail line between Montpellier-Lattes(Hérault) and Perpignan-Le Soler (Pyrénées-Orientales). Theforeseenactivitiesincludepre-projectstudiesoneachofthesevenconnectionsplanned to integrate thenewMontpellierPerpignanlineintotherailwaynetworkalreadyinoperation.
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested fundingTotal eligible costs €10,000,000
TEN-T requested funding: €5,000,000
TEN-T funding: 50%
Recommended funding €0
166
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedActionishighlyrelevant,asitcontributestotheimplementationofPriorityProject17andisinlinewith thecall forproposals.Thematurity ishighas theworkshavealreadystarted.TheexpectedimpactoftheActionispositiveanditsoverallqualityisgood.However,taking into account the need to handle the scarcity offundsand in linewiththecallprioritiessupport tothisAction would not optimise the effectiveness of TEN-Tfunding.
TheproposedAction,partofPriorityProject17,formsthesecondphaseoftheGlobalProjectwhichistheconstruc-
tionofEuropeanhighspeedlinebetweenParistoVendenhe-imnearStrasbourg,partofPriorityProject4.Thefirstphase,Paris-Baudrecourt(300km),wascompletedinJune2007.Theproposed Action includes construction works to extend thelinetoVendenheimnearStrasbourgwiththeconstructionof106kmofhigh-speedline—including4kmoftunnelundertheVosgesandbranchestowardsBaudrecourt(connectiontothe first phase already in service), Vendenheim (connectiontotheconventionallinetoStrasbourg),andjunctionstoLucy(servicestoLuxembourgandStrasbourg)andRéding(servicestoNancyandStrasbourg).
2012-FR-17051-P • Part of Priority Project 4
Second phase of the East Europe-an HSL (high speed line) between
Baudrecourt and Strasbourg
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested fundingTotal eligible costs €670,000,000
TEN-T requested funding: €134,000,000
TEN-T funding: 20%
Recommended funding €0
LocatedonPriorityProject16 (Freight railwayaxisSines/Algeciras-Madrid-Paris), the proposal concerns works
needed for re-opening the 24.5 km passenger rail linebetween the boroughs of Oloron-Sainte-Marie and Bedousin the Atlantic Pyrenees. The foreseen activities includepreparatoryworks,civilworks,worksontracks,signallingandtelecommunications;andautomationof level crossings.Thelineisplannedtobeputintoserviceby31December2015.
The relevance of the proposed Action to the call forproposals is good, as it contributes to the imple-mentation of Priority Project 16 and subsequentlyto the achievement of interoperability, facilitation offreight transport and modal shift from road to rail.Itsmaturity is good; the proposed Action has receivedthe required approvals and the necessary prepratorystepsareabouttobeaccomplished.Apositiveimpactisexpected.Thequalityoftheporposalisverygood.How-ever,givenitslocaldimenssionandinlinewiththecallforproposalsprioritiessupportofthisActionwillnotop-timisetheeffectivenessofEUfunding.
Oloron Bedous
2012-FR-16055-P • Part of Priority Project 16
PPs - New ActionMember States involved:France
Applicant:Ministère de l’écologie, du développement durable, et de l’énergie
Requested fundingTotal eligible costs €102,000,000
TEN-T requested funding: €30,600,000
TEN-T funding: 30%
Recommended funding €0
167
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedAction involvestheconstructionofanover-bridgetoeliminateReilly’sLevelCrossingontheDublin-
MaynoothLine.Situated4kilometresnorthwestofConnollyrailway station in Dublin’s city centre, it forms an essentialelementinfacilitatingincreasedcapacityontheexistingraillineforbothintercityandcommuterrailservices.Italsoaimsto improve traffic on the regional R103 Ratoath road andreducetrafficcongestion.
TheproposedActionisofverygoodqualityanditsma-turity isgood.The impact ismainlyexpectedonsafetyimprovementsaturbanlevel.However,therelevanceofthe proposed Action is limited because it does not layonaPriorityProjectanditmainlyconcernsanancillaryinterventionwithpositiveeffectsonurbantrafficlevel.
PPs - New ActionMember States involved:Ireland
Applicant:Department of Transport, Tourism and Sport
Requested fundingTotal eligible costs €7,889,000
TEN-T requested funding: €1,578,000
TEN-T funding: 20%
Recommended funding €0
Removal of level crossing and construction of overbridge at
Reilly’s Crossing on the Dublin-Maynooth rail line
2012-IE-26035-P • Part of Priority Project 26
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
2012-IE-26038-S • Part of Priority Project 26
Development of a replacement centralised traffic control centre - strategy study and detailed design
for tender
PPs - New ActionMember States involved:Ireland
Applicant:Department of Transport, Tourism and Sport
Requested fundingTotal eligible costs €2,482,000
TEN-T requested funding: €1,241,000
TEN-T funding: 50%
Recommended funding €0
The proposed Action ismature, as there are no pend-ingtechnicaloradministrativeissuestobesolvedbeforeitmight be launched. Its impact is good; the delivera-bleswillbeusedasadecision-makingtool.Thequalityisgood.However,itsrelevancetothecallforproposalsislowasitwillnotleadtodirectphysicalimplementa-tionoftheCentralisedTrafficControlCenteronPriorityProject26,sincethismissinglinkconcernedwillonlybyconstructedinthefuture.
TheproposalconcernspreparationofaneffectiveCentral-ised Traffic Control Centre (CTCC) development strategy
and design to accommodate the needs of the rail networkbasedbothoncurrentandforecasteddemandsupto2030.
ItisapartofGlobalProjectthatcoversimplementationofanelectrified,masstransitrailtransportoperatingintheDublinarea.
168
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
2012-IT-01077-P • Part of Priority Project 1
Technological Upgrade of the Florence Node
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €26,826,000
TEN-T requested funding: €5,365,200
TEN-T funding: 20%
Recommended funding €0
TherelevanceoftheproposedActionisinsufficientsinceitbelongsonlypartlyonPriorityProject1.Itsmaturityislowasthereisinsufficientevidenceofnecessaryapprov-alsandcommitment,thetechnicaldetailsprovidedaretoolimitedtoassesstheproposedAction’sreadinesstostart.Theimpacthasbeenestimatedasinsufficient.Thequalityislow,itlacksclarity,completenessandconsist-ency.
Theproposalconcernsanupgradeof thecontrol roomoftheFlorence-Romeremotecontrolsystem,aswellas its
extensiontotheFlorencenode.ItisapartofaGlobalProjectcoveringanupgradeoftheFlorencenodeandtheFlorence-Romerailwayline(PriorityProject1RailwayaxisBerlin-Vero-na/Milano-Bologna-Napoli-Messina-Palermo), with a view tooptimisingrailwaytrafficmanagementinthearea.
TheAction formspartofaGlobalProject thatentails thereplacementof technological installationsalong260km
oflinesmergingintotherailwaynodeofRome.Theactivitiesaim to introduce a new centralised rail trafficmanagementsystem based on SCC (Command and Control System) andACCMmodules(computerbasedmulti-stationinterlocking)ontwosections:•PoggioMirteto-RomeTiburtina•RomeCasilina-Campoleone
TheycomprisetheinstallationofthetechnologiesintheRomeTerminiexistingcontrolroomandatthestationslocatedalongthelines,inordertorenewtheexistingautomaticblocksys-temalongthetworailwaylinesconcerned.
ThequalityoftheproposedActionisgood.Itwouldhaveapositiveimpactataregionalandlocallevel,especiallyfor the connection of neighbouring areaswith the cityofRome.However, theproposedAction isonlypartial-lyonPriorityProject1and itsrelevanceunderthecallforproposalsislow.Moreover,itisinsufficientlymaturebecausepreparatory stepsnecessary for launching theActionhavenotyetbeenundertaken.
Technological Enhancement for the Rome Node: phases
2012-IT-01073-P • Part of Priority Project 1
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €71,400,000
TEN-T requested funding: €14,280,000
TEN-T funding: 20%
Recommended funding €0
169
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The Global Project is to deliver a new underground highspeed/high capacity railway link though the city of
Bologna,alongPriorityProject1(RailwayaxisBerlin-Verona/Milano-Bologna-Napoli-Messina-Palermo). The proposed Ac-tionaddressesamajorbottleneckbyopeningupthenewtun-nel(inauguratedinJune2012)topassengerstoppingservices.
TheproposedActionisrelevanttothecallforproposalsandaimsatremovingabottleneck.Itisexpectedtohavea positive impact on absorption of traffic growth,mo-dalsplit,inter-operabilityandsafety.Thequalityisgood.However,theActionisinadvancedstageofimplementa-tionsothattheleverageofEUfundingislimited.
HS/HC Bologna node: comple-tion of rail through link and rail
works in the HS station
2012-IT-01078-P • Part of Priority Project 1
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €77,933,622
TEN-T requested funding: €15,586,725
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The maturity is good because the study is already inprogress, and theproposal is ofgoodquality,with co-herentactivitiesand realistic froma technicalpointofview.However,therelevanceoftheproposaltothecallforproposalsislimitedbecauseitrefersmainlytourbandevelopmentissuesatlocallevel.TheimpactoftheAc-tionisonlyfairandthereisnoevidenceofthefollow-uptobegiventotheoutcomeofthestudies.Inaddition,thestudiesareataveryearlystage.
TheActionformspartofanurbanGlobalProjectinBozen/Bolzano(Italy)withthetrainstationandtheareaofthe
existingrailtracksplayingacentralrole.
TheActioncomprisesamasterplan,animplementationplanfor the reorganisation of Bozen/Bolzano rail station and apreliminaryprojectforarailtunnel.
2012-IT-01109-S • Part of Priority Project 1
MPM – BZ Masterplan Mobility Plan – Bolzano railway station
PPs - New ActionMember States involved:Italy
Applicant:Areale Bolzano - ABZ S.p.A.
Requested fundingTotal eligible costs €2,519,574
TEN-T requested funding: €1,259,787
TEN-T funding: 50%
Recommended funding €0
170
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedAction is relevant to the call for propos-als,verymatureandwithsignificantexpectedimpact.Itsquality isalsoverygood.However, taking intoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.
TheproposedActionconcernsworkstorenewandhomog-enise the signalling equipment along the Turin-Padova
rail line, which belongs to Priority Project 6 (Railway axisLyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border), Freight Corridor 6 and ERTMS Corri-dor D. The aim is to implement a highly advanced sys-tem of supervision, command and control, based on asingle supervision system for the whole line (SCCM), in-tegrated with five multi-station interlockings (ACCM), inorderthattheentireTurin-Padualineismanagedbyamain,safetycomputercontrollingfiveMilan-basedACCM.
2012-IT-06075-P • Part of Priority Project 6
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €211,289,940
TEN-T requested funding: €42,257,988
TEN-T funding: 20%
Recommended funding €0
Upgrading of the Turin-Padua line: line and station
installations
Located on Priority Project 6 (Railway axis Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian
border), the proposal concerns the definitive project studies for the Avigliana-Orbassano section. Activities include the prepara-tion of all plan descriptions, charts as well as the technical and economic data necessary for works implementation.
TheproposedAction,partofPriorityProject6,isrelevantasitfillsinacriticalsectionofthenewhighspeedlineTorino-Lyon and addresses a bottleneck. However, itsmaturity is insufficient as preliminary steps necessaryfor theAction to starthavenot yetbeen fulfilled. Thisconstitutesamajorrisk.Itsimpactisinsufficientasthefinancialanalysisisunclear;thesocio-economicanalysislacksdetails.Theproposal’squalityispoorduetoalackofsufficientlydetailedinformation.
2012-IT-06074-S • Part of Priority Project 6
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €32,310,000
TEN-T requested funding: €16,155,000
TEN-T funding: 50%
Recommended funding €0
Turin Beltway: final design of the Avigliana-Orbassano line
171
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action is part of a Global Project (HS/HC Terzo Valico dei Giovi Pass) located on Priority Project 24 (Railway axis Lyon/
Genova-Basel-Duisburg-Rotterdam/Antwerpen) It concerns in par-ticular:
•CampassoTunnel: tunnel of double track line locatedbetweentheprogressivekm0+437and1+153
•Passtunnelworksofthe:southernentrance,structuresfortheopenings,astretchnearthenorthernentrance,mechanisedex-cavationoftheoddtrackfromkm27+327tokm24+197andrelatedactivities
•Pass tunnel openings: construction of access tunnels to thevariousfrontsofthepasstunnelexcavation(usedtoensurethesafety of the infrastructure during the operation), namely theopeningsofPolcevera,Cravasco,Castagnola,andValLemme
TheproposedAction’s relevance to thecall forpropos-alsishigh.Itsmaturityisdemonstratedbypoliticalandfinancialcommitments.TheproposedActioncontributesto improveand increasetheflowof trafficbyaddress-ingabottleneck.Thequalityissufficient.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotoptimisetheeffectivenessofTEN-Tfunding.
PPs - New ActionMember States involved:Italy
Applicant:Ministero delle Infrastrutture e dei Trasporti
Requested fundingTotal eligible costs €463,706,340
TEN-T requested funding: €92,741,268
TEN-T funding: 20%
Recommended funding €0
2012-IT-24076-P • Part of Priority Project 24
HS/HC Terzo Valico dei Giovi Pass: works for the 1st and 2nd
constructive lots
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
The proposed Action addresses verywell the objectiveofthecallforproposalsbyfacilitatingthesmoothflowofpassengerandfreighttrafficonanimportantsectionof Priority Project 28. Its quality is good.However, theproposal’smaturity isonly fairas theproject’s specificfinancinghasnotbeenapprovedyet,whichisaprecon-ditionfortheworkstostart.TheproposedActionisnotreadytostart fromatechnicalpointofvieweither,asmostofthepreliminarynecessarystepsarestillpending.
Theproposal,aspartof theGlobalProject/PriorityProject28(“Eurocaprail”ontheBrussels-Luxembourg-Strasbourg
railwayaxis), involveworks for re-electrification toAC25kVoftherailwaylinebetweenLuxembourgandtheBelgianbor-der.Theproposedactivitiesarethereconstructionofexistingoverpassesandtheconstructionofnewelectrificationinstal-lations.
TheActionaimstocomplywiththetechnicalspecificationsforinteroperability,thustofacilitatetheflowoftrafficonPriorityProject28.
2012-LU-28032-P • Part of Priority Project 28
EuroCap-Rail: Luxembourg- Kleinbettingen (LU/BE border) -
re-electrification of the line in 2AC 25kV 50Hz
PPs - New ActionMember States involved:Luxembourg
Applicant:Ministère du Développement durable et des Infrastructures
Requested fundingTotal eligible costs €39,893,125
TEN-T requested funding: €7,978,625
TEN-T funding: 20%
Recommended funding €0
172
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
2012-NL-24009-S • Part of Priority Project 24
Design extension railway yard Rail service centre Waalhaven
Zuid–Port of Rotterdam
TheproposedActionisrelevanttothecallforproposals,althoughitlacksdemonstrationofitsaddedvalue.Itisinprinciplereadytostartfromatechnicalpointofview.However,itisnotbackedupbyanyfeasibilitystudy.Theimpactasadecisionmakingtoolisnotclearasitclaimstopreparefinalstudieswhileitwouldalsoleadtoafinaldecisionregardingimplementationofworks.Othersocio-economicandenvironmentalbenefitsarenotsubstanti-ated. Overall, the proposal’s quality is poor as it lacksdetailandjustificationinallaspects.
Rotterdam, the largest port in Europe, plays a crucial role in the growth and development of Europe. With the share of intermo-
dal rail freight traffic increasing over the last years, to maintain and extend this share and thus to assure a further development of the port, a reduction of bottlenecks and capacity gaps on the hinterland rail corridor is required. The Waalhaven Zuid railway yard, located near Rotterdam’s Rail Service Centre, will become one of the ma-jor bottlenecks on the hinterland rail freight corridor at the Port of Rotterdam. The Global Project will reduce the capacity gap by adding more, high quality railway yard tracks to the existing rail network. This assures the increasing share of intermodal rail freight traffic between Rotterdam and its European hinterland. The proposed Ac-tion will carry out design studies for adding tracks with ancillary equipment to the current layout of Waalhaven Zuid.
PPs - New ActionMember States involved:The Netherlands
Applicant:ProRail B.V.
Requested fundingTotal eligible costs €2,912,235
TEN-T requested funding: €1,456,117
TEN-T funding: 50%
Recommended funding €0
The Global Project is aimed at matching the increaseddemand for freight rail transport on the Rotterdam-
Emmerich section of Priority Project 24 (Railway axis Lyon/Genova-Basel-Duisburg-Rotterdam/Antwerpen).TheproposedActionrelatestotheimprovementofaportterminalrailfacil-ityinRotterdambytheadditionofmorewagonsidingsandalocomotiveyard.
TheproposedActionisverygoodintermsofrelevanceandmaturity.ItclearlyrelatestoPriorityProject24andaimsattheoptimisationofcapacityandefficiency.How-ever,theproposaldoesnotprovideanyquantificationofthe proposed Action’s impact and lacks information, inparticularregardingmilestones,organisationandmoni-toring.Thereforeitsimpactcannotbeassessedwhilethequalityoftheproposalislow.
Extension railway yard Maasvlakte West-Port of Rotter-
dam: Rail Freight corridor 8 (PP24) - phase 2 implementation
2012-NL-24008-P • Part of Priority Project 24
PPs - New ActionMember States involved:The Netherlands
Applicant:ProRail B.V.
Requested fundingTotal eligible costs €76,449,000
TEN-T requested funding: €15,289,800
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
173
The proposal, part of Priority Project 12 (Nordic Trianglerailway/roadaxis),concernsthenorthwesternpartofthe
ring road of Stockholm. It contributes to the Norra LankenGlobalProjectaimingatimprovingtheaccessibilityconditionson the road network of northern Stockholm by broadeningtheroadsections.Assuch,theActionisintendedtoremoveacapacitybottleneckandincreaseaccessibilitytotheharbour.
Therelevanceoftheproposalislowastheactivitiesfin-ishingwithinthecalltimeframe(beforetheendof2015)willbring insufficientaddedvalueatEU level.Thepro-posedActioncanstartand isexpected to complementpastinvestmentswhichweresupportedundertheTEN-tprogramme.However,thequalityoftheproposalissuchthatitisnotpossibletofullyassessthescopeandim-pactoftheproposedAction.
The Western Link - railway tunnel in Gothenburg
TheproposedAction is relevant to the call for propos-als,verymatureandwithsignificantexpectedimpact.Itsquality isalsoverygood.However, taking intoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.
Theproposal isastudyfora9.7kmdoubletrackrailwaytunnel, includingthreestations,underGothenburgcity. It
is the last stepprior to initiating the constructionplan. TheActionispartoftheGlobalProject“WestSwedishAgreement”,a package of infrastructure projects targeting public trans-port,railwaysandroadsintheGothenburgarea.
TheprojectaimstoeliminateabottleneckonPriorityProject12 (Nordic Triangle railway/road axis) by allowing trains togothroughGothenburgstation,whichiscurrentlyadead-endstation.
2012-SE-12021-S • Part of Priority Project 12
PPs - New Action Member States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €58,104,846
TEN-T requested funding: €29,052,423
TEN-T funding: 50%
Recommended funding €0
Route E4 - Relieving of bottle-necks and increased capacity
west of Hagastaden
2012-SE-12026-P • Part of Priority Project 12
PPs - New ActionMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €54,736,000
TEN-T requested funding: €10,947,200
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
174
TheproposalconcernstheconstructionofthelastmissingmotorwaysectiononroadE6ofPriorityProject12(Nordic
Trianglerailway/roadaxis)betweenGothenburgandtheNor-wegianborder.Theworksforthe7.5kmnewmotorwaysec-tionPalen-Tanumshedeincludetheconstructionofsixbridg-es,atunnelandarestarea.
TheActionaimstoeliminateanimportantbottleneckonthewesternpartoftheNordicTriangleandimprovetheCopenha-gen-Gothenburg-Osloconnection.
TheproposedActionisrelevanttothecallforproposalssinceitaddressesabottleneckofPriorityProject12.Itsmaturityisevidentastheworksarealreadyunderway.AverygoodimpactisdemonstratedatregionalandEUlevel.Thequalityisverygood.However,givenitslocaldi-menssionandinlinewiththecallforproposalsprioritiessupportofthisActionwouldnotoptimizetheeffective-nessofEUfunding.
2012-SE-12044-P • Part of Priority Project 12
Final section of the E6 motorway Copenhagen-
Gothenburg-Oslo
Stockholm Bypass: development of construction
plans
TheproposedActionisrelevanttotheobjectivesandpri-orities of the call for proposals. It ismature since theprojecthasalreadystarted. Its impact ishigh, theout-comeofthestudiesbeingthebasisforthesubsequentworks’ procurement. Its quality is good. However, thetimeline of its implementation goes beyond 2015 andthusdoesnotcomplywiththecallrequirements.
Theproposalconsistsoffinaldesignstudiesandtheprepa-rationofthetenderdocumentsforthesubsequentworks
oftheStockholmbypass,anewmotorwaylinkingthesouthernandnorthernpartsofthecityandpartofPriorityProject12(NordicTrianglerailway/roadaxis).Thestudiescoverinteraliathedesignofsix interchanges(Kungenskurva,Lovo,Vinsta,Hjulsta,AkallaandHaggvik).
2012-SE-12036-S • Part of Priority Project 12
PPs - New ActionMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €116,405,000
TEN-T requested funding: €58,202,500
TEN-T funding: 50%
Recommended funding €0
PPs - New ActionMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €71,011,950
TEN-T requested funding: €14,202,390
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
175
TheAction concernsworks for the construction of a roadtunnelunderariverinGothenburg.Theworksencompass
the construction of 500 m motorway in tunnel with inter-changesandlinkstothenationalandlocalroadnetwork.Theproposal ispartof theGlobalProject “WestSwedishAgree-ment”, a package of infrastructure projects targeting publictransport,railwaysandroadsintheGothenburgarea.TheaimoftheActionistoeliminateabottleneckbyreducingconges-tionintheexistingtunnelofroadE6,partofPriorityProject12(NordicTrianglerailway/roadaxis)andtoprovideanewlinkbetweenthePortofGothenburgandroadsE45,E20andE6.
TheproposedActionhasamaturitythatisdemonstratedbynecessarycommitments.Itsimpactisveryhighasitaimsatimprovingsafety,accessibilityandflowofgoodsandpassengersonamajorEUaxis.Theproposal’squal-ity is very good as the activities are coherentwith itsobjectives.However,itsrelevancetothecallforpropos-alsisunderminedastheActionisnotlocatedonPriorityProject12directly,althoughitaddressesabottleneck.
2012-SE-12068-P • Part of Priority Project 12
E6.21 Marieholm TunnelThe priority project Cityline Stockholm – an important link
in the Nordic Triangle
TheproposedActionisrelevanttothecallforproposalsas itaddressesverywellTEN-Tandcall forproposal’sprioritiesbytargetingtheremovalofamajorbottleneckonPriorityProject12.Itisverymatureastheworksarealreadyongoing.Itsimpactisverywelldemonstratedatlocalandregionallevel.However,givenitslocaldimen-sionandinlinewiththecallforproposalsprioritiessup-portofthisActionwillnotoptimizetheeffectivenessofEUfunding.
The proposal concerns the removal of a rail bottleneckin Stockholm affecting thewhole network. The City Line
project is a 6 km long double-track tunnel with two newstationsbeneathcentralStockholm,aswellasincorporatinga1.4kmlongbridge.TheaimoftheActionistodoubletheexistingtrackcapacitythroughStockholm,thustocopewiththe increasingtransportdemandoftheregionand increasethepunctualityofrailservices.
2012-SE-12047-P • Part of Priority Project 12
PPs - New ActionMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €598,372,000
TEN-T requested funding: €119,674,300
TEN-T funding: 20%
Recommended funding €0
PPs - New ActionMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €114,757,208
TEN-T requested funding: €22,951,442
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
176
LocatedonPriorityProject13(RoadaxisUnitedKingdom/Ireland/Benelux), the proposal concernsworks along two
heavilycongestedsectionsoftheA14thatbypassthetownof Kettering. The foreseen activities include the completionofillustrativedesign,workstenderprocurement,preparatoryworks,andmainworksconstruction.
TheproposedAction is relevant to the call for propos-als,verymatureandwithsignificantexpectedimpact.Itsquality isalsoverygood.However, taking intoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.
2012-UK-13090-P • Part of Priority Project 13
Removing Bottlenecks on PP13: A14 J7-9 Kettering Bypass
Improvement
Removing bottlenecks on PP13: A75 Improvements
TheproposedActionisrelevantotthecallforpropsoalsas itaddressestheremovalofabottleneckonPriorityProject 13 and it is line with the TEN-T priorities. Thematurityof theproposedAction isverygoodsince theActionhasalreadycommenced.Theimpactandqualityaregood.However,givenitspredominantlylocalimpactandinlinewiththecallprioritiessupporttothethispro-posalwouldnotoptimizetheeffectivenessofEUfunding.
TheAction is locatedon theA75 road that extends fromGretnaandtheA74(M)intheeasttoStranraerinthewest,
formingpartofPriorityProject13(RoadaxisUnitedKingdom/Ireland/Benelux).It comprises the construction and completion of two bypasses:
•DunragitBypass(5.3km)•HardgrovetoKinmountimprovement(3.6km)
Thepurposeofbothschemesistoprovideanadditionalover-takingopportunity for traffic travellingalong this sectionofroad.TheexistingA75sectionswillbede-trunkedandusedasasideroadtoaccessexistingpropertieswithinthevicinity.
2012-UK-13039-P • Part of Priority Project 13
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested fundingTotal eligible costs €30,190,863.30
TEN-T requested funding: €6,038,173.68
TEN-T funding: 20%
Recommended funding €0
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested fundingTotal eligible costs €99,678,260
TEN-T requested funding: €19,935,651
TEN-T funding: 20%
Recommended funding €0
177
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Removing Bottlenecks on PP13: M6 J10a - 13
Managed Motorway Scheme
TheproposedActionismatureasnecessarypreliminarystepshavealreadybeenfulfilled.Itsimpactandqualityaregood.Althoughitaddressestheremovalofabottle-neckonPriorityProject13,itisprimarilyITSrelatedbutitisnotcompliantwiththerequirementsoftheITScall.
The proposal aims at providing a “managed motorway” scheme between junctions 10a-13 of the M6 motorway between
Birmingham and Manchester. This is a strategic route that carries high volumes of heavy goods (22% of traffic consists of HGVs). More precisely, the proposal consists of two distinct sections:
•Junctions 10a-11a: a controlled motorway technology (“man-agedmotorway”) isforeseentocontroltrafficflows, lanedisci-plineandspeedsmoreeffectivelythroughtheuseofoverheadgantries,lanespecificsignalsanddriverinformationsigns.Italsoenablesthehardshouldertobeusedasanextratrafficlanedur-ingperiodsofcongestion.
•Junctions11a-13:ahardshoulderrunningsolutionwillgiveex-tracapacityandgantrysigningwill controlspeedsat timesofcongestion
2012-UK-13091-P • Part of Priority Project 13
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested fundingTotal eligible costs €46,782,546
TEN-T requested funding: €9,356,508
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Port Salford – removing bottlenecks and improving in-termodality on PP26 and PP14
The proposed Action is very relevant to the call forproposals as it concerns a tri-modal terminal relatingto Priority Projects 26 and 14. It is verymature, withrequiredapprovalsinplaceandworksreadytostart.Verypositivesocio-economicimpactpotentialisforeseenwithallpositiveenvironmentalconsequences.Thequalityoftheproposalisverygood.However,takingintoaccounttheneedtohandlethescarcityoffundsandinlinewiththecallprioritiessupporttothisActionwouldnotopti-misetheeffectivenessofTEN-Tfunding.
Port Salford Intermodal Terminal will be the UK’s first tri-modal freight interchange, served by rail, inland waterway and road. It
will improve efficiency, inter-modality and reduce bottlenecks on Pri-orityProject14 (West coast main line) and PriorityProject26 (Rail-way/road axis Ireland/United Kingdom/continental Europe) and stim-ulate local and regional economic growth. Port Salford is a major part of a government-supported economic growth strategy called Atlantic Gateway. It is located on the Manchester Ship Canal, to the west of Manchester, and will be connected to the Liverpool-Manchester rail line via a new branch line. It will have a new wharf suitable for con-tainer vessels. Port Salford Intermodal Terminal will have a handling capacity of 283,000 TEUs and service up to 8 freight trains per day in this initial phase (up to 16 in future phases), with modal shift from road to rail and inland waterway leading to operational and environ-mental benefits on the TEN-T road network.
2012-UK-26017-P • Part of Priority Project 26
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested fundingTotal eligible costs €37,452,680
TEN-T requested funding: €7,490,536
TEN-T funding: 20%
Recommended funding €0
178
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
PP26: Improving intermodal access to Liverpool Port
TheproposedAction is ready tostart.However, it con-cernsafeasibilitystudythatwillnotleadtoimplementa-tion,thusfailingtomeettheobjectivesandprioritiesofthecallforproposals.TheActiondoesnotdemonstrateitsimpacttomultimodality,asitmainlyaimsatexpand-ing the existing road capacity to the port. The overallqualityoftheproposedActionisnotsound.Detailedandquantitativeinformationismissing.
TheActionconsistsoffeasibilitystudiesandoptionsassessments,toprovideevidenceforthedevelopmentofbusinesscasesforspe-
cificinterventionstoaddressbottlenecksonPriorityProject26(Rail-way/roadaxisIreland/UnitedKingdom/continentalEurope)fromIre-land/UK/continentalEuropeattheLiverpoolnode.ThemainobjectiveoftheActionistotacklethefreightbottleneckattheLiverpoolnodeonPriorityProject26,inordertomeetthetransportneedsoffutureportexpansion.TheoutputfromeachActivitywillbeusedtosupportthedeliveryofamulti-modalworkprogrammetoaddressportaccess.ThecontributiontomanagingtrafficandreducingthebottlenecksonPri-orityProject26ofeachoftheproposedinterventionswouldbecom-pared.Thiswouldbeusedtoprovideevidenceforimplementingamulti-modalapproachtotacklingthefreightbottleneckintheLiverpoolcityregion.
2012-UK-26065-S • Part of Priority Project 26
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested fundingTotal eligible costs €1,118,400
TEN-T requested funding: €559,200
TEN-T funding: 50%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposalconcernstransformationofrailtravelacrossthenorthofEnglandwithshorter journey timesand the
capacityformoreservicesperhouronsmarterroutesbetweentownsandcities.Inparticular,theActioncoverscompletionofamissingrailwaylinkbetweenManchester’sVictoria,OxfordRoadandPiccadillystations;extensionoftracksbetweenRobyand Huyton Junction on the Liverpool-Manchester line andconstructionofanadditionalplatformandassociatedrailwayinfrastructureat theManchesterAirportStation. It isapartofaGlobalProjectthatcoverscompletionofPriorityProject26(Railway/roadaxisIreland/UnitedKingdom/continentalEu-rope)intheUK.
The relevanceof theproposedAction is highas it ad-dressesabottleneck,primarilyrelatedtothepassengerrailwaytransport, intheareaofManchesteronPriorityProject26.Ithasaconsiderablepositiveimpactonpas-sengertransportmodalshift.Theoverallqualityoftheproposalisgood.However,thematurityoftheactioniscompromised by pending authorizations, which put atriskthetimelineforfinalisationby2015,asstipulatedinthecallforproposals.
2012-UK-26062-S • Part of Priority Project 26
Completing PP26 (Liverpool-Hull) and delivering the TEN-T core rail network in the United Kingdom:
Northern Hub
PPs - New ActionMember States involved:United Kingdom
Applicant:Department for Transport
Requested fundingTotal eligible costs €114,267,458.90
TEN-T requested funding: €22,853,41.57
TEN-T funding: 20%
Recommended funding €0
179
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Works for construction of new high speed line between Kundl/
Radfeld and Baumkirchen
2012-AT-01080-P • Part of Priority Project 1
PPs - Ongoing ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested fundingTotal eligible costs €86,400,000
TEN-T requested funding: €12,960,000
TEN-T funding: 15%
Recommended funding €0
TheproposedAction concerns a request for an increasedsupportratefrom5%to20%forAction2007-AT-01130-P
(Railway axis Berlin-Verona/Milano-Bologna-Napoli-Messina-Palermo).ItconcernstheconstructionofanewdoubletrackhighspeedraillineforfreightandpassengertrafficbetweenKundl/Radfeld andBaumkirchen in the Lower InnValley, anidentifiedbottleneckofPriorityProject1(RailwayaxisBerlin-Verona/Milano-Bologna-Napoli-Messina-Palermo).
TheprojectwillcontributetothecompletionoftheMunich-Milansection,inparticulartothenorthernaccesstotheBren-nerBaseTunnelbetweenAustriaandItaly.
Linked to Action 2007-AT-01130-P
Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.
TheproposedAction concerns a request for an increasedsupportratefrom14.03%to20%fortheAction2007-AT-
17040-P(WorksandstudiesforupgradingtheWien-Bratislavarailwayline:6sub-projects).PartofPriorityProject17,Railwayaxis Paris-Strasbourg-Stuttgart-Wien-Bratislava, the Actionincludesthethreemainworks:
•ConnectionofnewVienna’sCentralrailwaystationtoEast,WestandSouthrailwaystations(6km)
•NewGötzendorferjunction•Klederingloop:connectionbetweenVienna’sCentralrail-waystationandViennaAirport
Linked to Action 2007-AT-17040-P
Works and studies for upgrad-ing the Wien-Bratislava railway
line (6 subprojects)
2012-AT-17045-P • Part of Priority Project 17
PPs - Ongoing ActionMember States involved:Austria
Applicant:Bundesministerium für Verkehr, Innovation und Technologie
Requested fundingTotal eligible costs €377,480,000
TEN-T requested funding: €60,283,557
TEN-T funding: 15.97%
Recommended funding €0
180
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.
T he proposed Action requests an increased TEN-T support rate from 5.59% to 20% for the ongoing Action 2007-BE-02030-P
(Diabolo - Rail link between Brussels Zaventem airport and the Tha-lys high speed train network).It aims at building two rail connections as part of the “Diabolo” Global Project, which aims to link Brussels Airport to the Brussels-Antwerp line:
•The new double track L25N between Mechelen andBrussels,includingaconnectiontothenewline36C(tunnel).
•Asingletrackbranch(line36C/2),whichconnects line26withthenewline25NatHaren,allowingtrainscomingfromtheBrus-sels-SchumanstationtoconnectdirectlytoBrusselsAirport.
Linked to Action 2007-BE-02030-P
Diabolo - Rail link between Brussels Zaventem airport and
the Thalys high speed train network
2012-BE-02104-P • Part of Priority Project 2
PPs - Ongoing ActionMember States involved:Belgium
Applicant:Infrabel SA
Requested fundingTotal eligible costs €32,255,511.32
TEN-T requested funding: €6,451,102.26
TEN-T funding: 20%
Recommended funding €0
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Theproposalforanincreasedco-fundingratewaswellpresented.However, thisAction is veryadvanced in itsimplementation.Therefore,takingalsointoaccountthescarcityofavailablefundsinthisareainlinewiththecallfor proposals, an increase of TEN-T fundingwould notproduceanyaddedvalue.
Theproposalisarequestforanincreaseoftheco-fundingrate from 5% to 20% for the ongoing action 2007-BE-
28050-P (EuroCap-Rail modernisation de l’axe ferroviaireBruxelles-Luxembourg).Thisprojectconsistsofthemoderni-sationofthesectionoflines161/162betweentheLouvain-la-Neuve junction and the Belgium-Luxembourg border, inordertosubstantiallyincreaseitscommercialspeed.
Linked to Action 2007-BE-28050-P
EuroCap-Rail
2012-BE-28111-P • Part of Priority Project 28
PPs - Ongoing ActionMember States involved:Belgium
Applicant:Infrabel SA
Requested fundingTotal eligible costs €194,513,459.12
TEN-T requested funding: €38,902,691.83
TEN-T funding: 20%
Recommended funding €0
181
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
Theproposalforanincreasedco-fundingratewaswellpresented. However, taking into account the scarcityof available funds in this area in linewith the call forproposals,anincreaseofTEN-Tfundingwouldnotpro-duceanyaddedvalue.
The main objective of the Action is to facilitate a modal shift from road to sea by providing more efficient transport solutions and improving
access to markets in Central and Northern Europe — especially in the Baltic Sea region. This will relieve the main roads of Central and Northern Europe of excessive heavy cargo transports and result in a significant reduction of the forecast future pressure on sea ports in continental Europe.
The Baltic Sea hub and spokes system is a joint action for the ports of Gothenburg, Aarhus and Tallinn. The three ports represent a large region, whose unique location is close to large markets in both the east and west. On this basis and considering the size and facilities of the ports, the region has a huge potential to attract large transnational carriers. In a wider perspective and in a later phase, the action will also aim to include other ports in the Baltic Sea geographical area and neighbouring countries.
Linked to Action 2010-EU-21108-P
PPs - Ongoing ActionMember States involved:Denmark, Estonia, Sweden
Applicant:Municipality of Aarhus
Requested fundingTotal eligible costs €83,664,640
TEN-T requested funding: €21,450,401
TEN-T funding: 25.64%
Recommended funding €0
Baltic Sea Hub and Spokes project
2012-EU-21028-P • Part of Priority Project 21
NOT RECOMMENDED FOR FUNDING
Evaluation remarks
TheproposedActionconcernsarequestforincreasedTEN-Tfundingfrom5,69%to20%forAction2007-SE-12090-
(Works for construction of road sectionNorra Länken). ThisprojectconsistsofworksontheringroadofStockholmlinkingroadE4andE20totheharbourthroughatunnelsystem.
Linked to Action 2007-SE-12090-P
TheproposedincreaseofTEN-Tsupportishighlyrele-vanttothecallforproposalsasitisexpectedtofacilitatethe smooth implementation of theAction. TheAction’smaturityisataverygoodlevelanditcontainsasoundandwell-structuredimplementationplan.Theproposalisofveryhighqualityintermsofstructure,completenessandclarity.However,takingintoaccountthescarcityofavailablefundsinthisareainlinewiththecallforpro-posals,anincreaseofTEN-Tfundingwouldnotproduceanyaddedvalue.
PPs - Ongoing ActionMember States involved:Sweden
Applicant:Trafikverket
Requested fundingTotal eligible costs €251,632,809
TEN-T requested funding: €50,326,561
TEN-T funding: 20%
Recommended funding €0
Works for construction of the road section Norra Länken (Northern Link): Increased
support2012-SE-12020-P • Part of Priority Project 12