TENNESSEE VALLEY AUTHORITYWATTS BAR NUCLEAR PLANTAUXILIARY FEEDWATER SYSTEM
INDEPENDENT REVIEW
SUPPLEMENTARY REPORT
B&V PROJECT NO. 10520
Issued: February 7, 1984
TVA CONTRACT NO. TV-60052A
~BI~k& eatcriEnoieersArciote ts
6402160294 840207PDR ADOCK 05000390 IA . PDR AA
lb
THE ATTACHED FILES ARE OFFICIAL RECORDS OF THEDIVISION OF DOCUMENT CONTROL, THEY HAVE BEENCHARGED TO YOU FOR A LIMITED TIME PERIOD ANDMUST BE RETURNED TO THE RECORDS FACILITYBRANCH 016. PLEASE DO NOT SEND DOCUMENTSCHARGED OUTTHROgUGH THE MAIL., REMOVAL OF ANYPAGE(S) FROM, DOCUMENT FOR REPRODUCTION MUSTBE REFERRED TO FILE PERSONNEL.
DEADLINE RETURN DATE __________________________________________
C./
RECORDS FACILITY BRANCF r
TENNESSEE VALLEY AUTHORITYWATTS BAR NUCLEAR PLANT
AUXILIARY FEEDWATER SYSTEMIND)EPENDJENT REVIEW
SUPPLEMENTARY REPORT
TABLE OF CONTENTS
Section
- - INTRODUCTION
1.0 EXECUTIVE SUMMARY
2.0 METHODOLOGY
3.0 REPORT ORGANIZATION
4.0 CLASSIFICATION OF FINDJINGS
5.0 DISCUSSION OF RESULTS
TC-1020784
INTRODUCTION
In the later part of 1982, Tennesses Valley Authority (TVA) commis-
sioned Black and Veatch (B&V) to perform an independent review of the
Auxiliary Feedwater System (AFW) for Unit 1 of the Watts Bar Nuclear Plant
(WBNP). The initial review was completed in November of 1982 and culmi-
nated in a Report that was issued in April of 1983. This report was issued
simultaneously to TVA and to the Nuclear Regulatory Commission (NRC) and
defined a total of 328 items for which additional action was either required
or suggested. These items were classified as confirmed, open, or punchlist
items in the initial report.
Subsequently TVA, in September 1983, issued a Supplement to the original
contract authorizing B&V to assist in responding to NRC inquiries.
On October 25, 1983, a meeting was held in Knoxville between TVA and
B&V to discuss the guidelines for following up and/or closing out the
outstanding issues included in the original report. The agreements reached
and methods chosen were then documented in the project instruction to
assure that the action parties were in agreement as to the requirements.
This report covers the follow-up activities on the outstanding items
in the initial 1983 report and provides their currre nt classifications.
020784
1.0 EXECUTIVE SUMMARY
The independent review of the Auxiliary Feedwater System for Unit 1 of
the Watts Bar Nuclear Plant was initiated on September 3, 1982 and culmi-
nated in the issuing of a report in April of 1983.
TVA subsequently authorized follow-up action on the 328 outstanding
items defined in the original report. This effort was initiated at a
meeting held in the Knoxville office of TVA on October 25, 1983. The work
of evaluating data and information extended from about November 10, 1983 up
through January 31, 1984. This process resulted in resolving all but three
of the outstanding issues.
The three outstanding issues are: (1) Finding G901 which concerns
electric cable ampacity and the use of fire retardent materials on electrical
cables. This finding is classified as Confirmed; (2) Finding F508 which is
classified as Open and concerns baseplate design and; (3) Finding F511
which is also classified as Open and deals with the subject of peak broaden-
ing of response spectra.
The two open issues have potential licensing implications and an
action plan had not been defined as of the writing of this report. The
confirmed finding has an acceptable action plan for resolving the issue.
1-1020784
2.0 METHODOLOGY
The guidelines established for executing the follow-up action of the
project were relatively simple. They consisted of the following.
(1) The supplementary report which would define the disposition of
each item would be handled in the same manner as the original
report.
(2) All communication, including telephone conversation on technical
matters, would be made available to the NRC.
(.3) TVA would submit supplementary information on findings to B&V via
TVA Form 3 for evaluation. The use of this form was limited to
areas in which corrective action was already complete or where an
existing formalized program existed which would assure that
predefined action would be completed.
(4) A TVA Form 4 would be submitted for items for which action was
not complete and not predefined. This form would define the
corrective action plan which was to be used in investigating
and/or resolving the issue.
(5) Document Review Record (DRR) punchlist items were to be forwarded
in a matrix format along with sustantiating information which
demonstrated current status.
Figure 2-1 depicts the general handling of supplementary information
associated with each finding.
Upon receipt of a Form 3 submittal, the Black & Veatch Project Manager
reviewed the information in conjunction with the original finding and where
necessary in conjunction with the initiating Document Review Record. Based
on this review, and where necessary input from disipline engineers, an
opinion was reached as to the proper classification to be assigned to the
finding. If the classification was resolved, the form was annotated and
submitted to the chairman of the Senior Review Team for his reveiw and
action. If the submittal was judged to be inadequate to permit a resolved
classification, TVA was contacted to permit further discussion, clarifica-
tion and/or data submission. This process was repeated until a conclusion
was reached on the classification to be applied.
2-1020784
TVA SCREENOUTSTANDING
ITEMS
TVA FRM 3TVA FORM 4TO B& FORTO B&V FOR
REVIEWREVIEW
B&V AGREES ~~INTER ORGANIZATION NOBVAREI& GRE NO DIALOGUE TO NO B&CGREWITH DEIEAWITH CORRECTIVE
LASSESSMENT SOLUTION ACTION PLDAN
YES YES
SUPPLEMENTARY
FLOW CHART
FOLLOW UP ACTION
FIGURE 2-2
2-2020784
Action plans submitted in response to findings which were classified
as confirmed during the follow-up process were handled in a manner that was
similar to that used for supplementary data submitted via Form 3.
Information relating to Document Review Record punchlist items were
reviewed by the Project Manager and statused accordingly. TVA was offered
an opportunity to augment their initial submittals in an attempt to satisfy
concerns raised during the review process. The handling of DRR items
paralleled the handling of these items during the original review process.
The basic goals established, for this follow-up action, were to attempt
to reclassify all outstanding items into a Resolved or Confirmed stat-us and
to develop an acceptable action plan for those items classified as Confirmed.
2-3020784
3.0 REPORT ORGANIZATION
This report is organized into several volumes, each consisting of one
or more books.
The Basic Volume, of which this section is part, contains a description
of this portion of the project, a computer listing of the disposition made
of the findings, and a listing of DRR items including any commen tary and
disposition.
Appendix A contains reproductions of the TVA forms which submitted
supplementary information and/or action plans. In most instances, the data
forwarded with the form as well as clarifying information has been included.
In instances where the quantity of information reviewed was very large, a
list of the documents examined has been included in lieu of copies of the
documents. The Appendix consists of several books.
3-1020784
4.0 CLASSIFICATION OF FINDINGS
As indicated earlier in this report, the goal of this portion of the
project was to restatus the outstanding items listed in the initial report
to either a Resolved or Confirmed classification and to develop an acceptable
action plan for any items that were classified as Confirmed.
The Resolved status was to be assigned to items in which the necessary
corrective action had already been completed or where the required action
was predefined and the item included in a formalized tracking system.
Examples of formal tracking systems include Non-Conformance Reports which
have proceeded beyond step five, Commitment Tracking Records, and Work
Lists generated during the system walk down performed in response to spe-
cific regulatory requests or for transfer of permanent features to the
Division of Nuclear Power.
The Confirmed status was to be applied when it was agreed by both TVA
and B&V that significant concern existed which required further investiga-
tion and/or analysis to determine the impact of the finding.
Although an Open status was not a desired status, the designation was
retained to cover those items which resulted in an impasse between TVA and
B&V.
4-1020784
5.0 DISCUSSION OF RESULTS
The original report of the AFW independent review contained a total of
328 outstanding items. Of this total, 51 were DRR related punchlist items
and 277 were finding related. The finding related items consisted of
62 nonpunchlisted and 215 punchlisted items.
The follow-up status of these 328 items is as follows.
Confirmed Finding 1
Open Findings 2
Resolved Findings 274
Resolved DRR items 51
Total 328
The Confirmed Finding is G901 and concerns electrical cable ampacity
and the effect of a fire retarding compound on intermediate voltage cable
groups.
The two Open Findings are F508 and F511. The F508 finding concerns
the design of baseplates and F511 covers peak broadening of earthquakes
response spectra.
The significant statistics associated with this follow-up effort are
as follows.
(1) Of 32 original nonpunchlisted Confirmed findings, all but one
has been resolved.
(2) Only two of the original 30 nonpunchlisted open findings have
remained in that classification.
(3) One Finding F124, was improperly statused as a punchlist item in
the original report.
(4) All 215 of the origin al punchlisted findings have been resolved.
(5) Two of the punchlisted DRR items did not, in fact, require rework
and were improperly statused by B&V.
(6) One punchlisted DRR item was, in fact, an observation rather than
a punchlist item.
(7) All DRR items have been closed out as resolved.
In conclusion, 325 of the original 328 items have been classified as
resolved. The remaining three outstanding items are G901 which has been
5-1020784
classified as Confirmed and F508 and F511 for which the classification was
left as open. A computer generated Finding Report Supplement and a Document
Review Record Tabulation are contained at the end of this volume.
5-2020784
BLACK i EATCH ENGINEERS-ARCHiTEETSKANSAS CITY9 MISSOURI
FINDING ORIGINALNo. DIN DES CR
PRDCESSING DAT I8TENNESSEE MWEY AUTHORITYWATTS BAR NUCLEAR PLANT
F114DINGS REPORT SUPPLE1MENT
_____ OR [G 1 R9LSTATUS
1PTION PL TV CA
3525 EACH MOTOR-DRIVEN AUXILIARYrEEDWATER PUMP IS SUPPORTED BY ITS
ITS SAFETY-RELATED FUNCTION.[iNGERSOLL RANDS OPERATING
FOLLOW UP FOLLOW UP
DIN CLASS.
T 0 A 5211 R A
IN51RUETION PRjOHIBITS THE OPERATION4OF THE DRIVE MOTOR WITHOUT PROPERLUBRicATION.J EACH LUBE OIL PUMP HAS
CIRCUIT REL;-ASER ON CTHEMTO COlfkNTRO
45w751-1 REV. 15; OTHER THAN THE
rENTER WHICH WILL ALLOW THE MOTOR TO)
BE REMOVED FOR MAINTENANCE
FO 101 4249 ON DRAWING 47W610-3-3 REV. 7 RH 8 5088 RA
THE FOLLOWING DEFICIENCIES9ERE NOTED: 1. SOIME DEVlICES ARE NOT
IDENTIFIED WITH THE ASTERISKALTHOUGH THEY ARE MOUNTEDON THE SWdITCHGEAR [SHUTDOWN bOARDJ.
r t 44t ~ 4 w2.4A
2. SOME DEVICES NOT IDENTIFIED AS TO
______IMEBJ&AL ANEL. 3. SAR TABLiE7.5-1 SHOULD LIST AFU FLOWJ
Fo 102 4250 47W610-3-3 REV. 7 Y R A 5078
DEFICIENCIES NOTED; 1. INDICATINGLIGHTS ASSOCIATED WITH SWITCHESHS-3-179A/B AND HS-3-17981D ARENOT SHOWN. 2 LM-3-172 AND LM-3-175
LM-3-173 AND LM-3-174 SHOWN TO BE
LOCATED ON L-1193. THE CORRECT
____________ ______LCATION FOR-ALL FOUR LMS ________________
ARE L-381.
PAGE 1
fo 100
3d1371-
---- ------------------------------------
D2184
BI LATCH ENGINEERS-ARCHlrLCTSIAN IY, MISSOURI
TENNE5S LE EV AUTHORITYW~ATTS a~1 U CLEAR PLANT
llWEW ROLE-CT IUS.ZILFINDINGS REPORT SUPPLEMlENT
PROCESSING 2/02184
FINDING ORIGINALNO. DIN
LSTATUS FOLLOW UPDESCRIPTION PL TV CA DIN
F0103 4304 ON DRAWING 47W611-3-4 REV. 2; THE V, R A: 5000 R AFOLLOWING DEFICIENCIES WERE NOTED.
~~1XffE kAwiNr-SHoWiSX[R.ANS~fER ___________ ____
SWITCHES XS-46-54 AND XS-46-56. THEELECTRICAL INSTRUMENT TABULA7iON. -... A ý TH-AE-H~EflATICOI-0AGRAM'45W600-46-6 USED XS-46--57. 2. THEDRAW1NG INCLUDES SWITCH HS-46-56E
IUJT A &-iaO1LJSun"1t Thf~_____________ E_______________
ELECTRICAL INSTRUMENT TABULATIONNOR IS IT USED ON SHEPIATIC DIAGRAM
A QW 60- f -6 3.iiAJL~ W hSSWITCH HS-46-57. THE ELECTRICALINSTRUMENT TABULATION AND THEStI4NATIf r bAGRAM,ýAýfiO-46-6- USED
3-9-1 L BfARD kA;jDR A~i~ii4AJ7W-fZ5 8 VLI-3-17Z LEVEL INDICATOR MOUNTEDUNDER MARKING FOR STM. GEN. 1;Li-3-174 MOUNTED UNDER MAPRKING FnfiSTM. GEN. 3
ID~A~~__5079
FO105 4251 REFERENCE TWA DWG 47W760-3-1 REV. 4THE TRANSFER SWITCHES fl-XS-3-118
Li~S~~18]Ok -EAC.H.PURP-ARE--SHOWN CONNECTED ON THE NEGATIVESIDE OF THE TRIP COIL [52TCJ INA MANIVOar TLAAT &I k LI( TUC~ l(4DMAI
CONTROLCONTROL
_TliR G HCIRCUIT.
BUS AND THE EMERGENCYBUS TO BE INTERCONNECTED-T HE- RE AKE "R.IP-PING
PACE2
FOLLOW UPCLASS.
24
25
___f 01 04k
V R:A' 5001
2
Y 0 -A- 5079
CIWEA7CH ENGINEERS-ARCHITECTSSAS CITY, MISSOURI
ELLAKAN
.1 FINN
6 -
7 F0
13
16
19
20
2(
1GINAL
TLlJNESSLLEY AUTH4ORITFYVATTS GAR NUCLEAR rLANJT
FINDINGS REPORT SUPPLEMENT
O R 1 G IN AL__STATUS FOLLOU
DIN VESCRIPTIOih PL TY Ch DIN
3912 REF. TVA DWG 4SW760-3-1; REV. 4 V 0 A 5002THE BLACKOUT-SAFETY INJECTION
DRIVEN AUX FM PUMP ONLY IF AN ACTUALBLACKOUT EXISTS. THIS IN NOT
[IVA DWG 47W611-3-3;, REV. 23 wHiCHINDICATES THAT THE PUMP SHOULD ALSO
WITH NO BLACKOUT CONDITION.
U P
VO 107 42Z52 DRAWING 47W600-57, PANEL L1-VA. Y R A 5080LM-3-172 AND LM-3-175 ARE NOTMffUNLTLD-IHIiS-P-ANMEL~A11EtAR-LMOUNTED IN LOCAL PANEL L-381PER ELECTRICAL INSTRUMENT TABULATION
4lP41~9.2. HAVING 76QO;_____PANEL L-111). 04-3-173 AND LM-3-174ARE NOT MOUNTED IN THIS PANEL.
------ HEY ARE MOUNT-ED IN LOCAL PANELL-381 PER ELECTRICAL INSTRUMENT.TABULATION 470601-D.
R A
4253 REFERENCE TVA DWG 4561767-28 REV. 6 Y R A, 5003------- E -O N C I J .E E ... ._---_-----
THE RED LIGHT AND GREEN LIGHT ISTAGGED WITH WIRE NUMbiER 2 [TERMINAL
2avlJ.~~ HOER4HFLATICDIAGRAM 45W760-3-3 REV. 6INDICATES THAT THIS CONNECTION
[WIRE NUMBER 11
PAGE 3
DING OR~
106
PROCESSING D /DZi84
FOLLOW UP
C LA SS.
R A
folio
.H ENGINEERS-ARCHITECTSMIS SOURI1
TLNM4LSSEE V~ AUTHORITY PROCESSING DATE
6ATTS BAR =Ak LAN
F114DINGS REPORT SUPPLEMENT
FINDING ORIGINALN 0 DIN
foill .3913
DESCRIPTION- - - - - - - - - - - - - ----------
STATUS FOLLOW UPPL TV CA DIN
TVA ow6 45WI767-4; REV. 9 TERMINALS 10 'A 5004
51 AND 55 FOR VALVE 1-FEV-3-1368-A-AR-S LAIWli"fNNE.CliE TO-hI-O-[H iURRERSS3002 & 3B01 RESPECTIVELY. THIS ISNOT CONSISTENT WITH SCHEMATICr4IArRAM 45W760-3-Si REV, 4 WHICHIN6ICATES THAT THE WIRE NUMBERSSHOULD BE 39C2 L30CI RESPECTIVELY.
REF. TVA DUGS 45W?60-3-3; REV. 6 &45W?60-3-4; REV. 6. "N BOTH OF THEABOVE DRAWINGS; TINE DELAY RELAY62 IS SHOWN WITH A TIME SETTING OF33k SrflM~S.. THIS IS NOT COMPATIBLE
I B 5089 RBa
WITH THE.'TIME RANGE OF 2-20 SECONDSWflHICH S-SHOWN ON LOGIC DIAGRAM
31
32
33 F0114 -4254 -REF TWA DWG 45W760-3:-3 RE-V. 6& 45W760-3-4 REV. 6. PRESSURESWITCHES I-PS-3-139A;b L D ANDI-PS-3-144A;D & CHAVE A
YR A 5212 RA_ _ _ _ _
SEIPOINT OF 1 PSIG INDICATED IN NOTE.3 ON THE ,ABOVE DRAWINGS. THISDOES NOT AGREE WITH THE ELECTRICAL ___________
INSTRUMENT TABULATION [TVA DUG47B601-3-0 REV. 10J WHICH INDICATESA SETjpOnT- OF 4~ 75.
0
PAGE 1*
BLAC(KKAN SAS
FOLLOW UPC L ASS.
FO 113 4359
E 4
3S
54
59
47W&11-ý3-3 gEV. 2
,H ENGINEERS-ARCHITECTSMISSOURI
lINNESSEEI6ATTS UAR
PROCESSINa DATEFAUIH OR ITVAR PLANT
'6 b13&V PROJECT 1la5Z)-1 FINDINGS REPORT SUPPLEMENT
4 FINDING ORIGINAL, STATUS FOLLOW UP FOLLOW UP
NO. DIN DESCRIPTION PL TV CA DIN CLASS.-6 -- --- --- -- --- -- ---- -- -- - -- - - --- -- -
7 F0115 3914 REF. TVA DWGS 45W760-3-3; REV. 6! HA 5090 R AL 45W760-r3-4; REV. 6. ON BOTH OF THE
4 BDLkAW-1MfrS-k-LAI AiJLIS k14----10 SHOWN. HOWEVER; TVA DWGS 4581767-2A;11 REV. 6 AND 4581769-2A; REV. 6
INDriIATF THAT RfmAY 62X FX1&Tc AND3IS UTILIZED TO MULTIPLY THE CONTACTS
14Of TIME DELAY RELAY 62.
20 0116 4255 REF TYR DWG 45BI769-ZA REVi. 6 1 R A 5005 R A21 ~~THF WIRE rONKEETION BETWEEN ----
22 THE RED LIGHT AND THE GREEN2' LIGHT IS NOT TAGGED. SCHEMATIC
24 DIAGRAM 45W760-3-4 REY,. 6 INDICATES25 THAT .THE CONNECTION IS ASSOCIATED26 WITH TERMINAL 2AX1 [WIRE NUMBER 1].27
26
20
4256 .REF TVA DWG 45WI769-5; REV. 3 Y R. A 5006 R A
CONNECTED TO THE GREEN LIGHTASSOCIATED WITH SW1TCHI..ue_%_470Als2 Tultnnr I5A i a4Ago~rF
WITH SCHEMATIC DIAGRAM 4,5W760-3-5;REV. 4. WHICH INDICATES THAT THErn~.umt1-tfu c~hilflht AC TAnnFb IAG
_____[1TE-M B-30 LiTIALCEKII IIDENTIrIES TWA'S CONFORMANCE TOIRG 1.106. SEVERAL DEFICIENCIES
PA(.E 5
BUACKkKAN SAS
2-7
F0117
[f01 19
NOTED
F CH EtJGJNEERS-ARCHITECTS,MISSOURI
TENNESSEE VW AAU7HOPITYb6ATTS BAR AR PLANT
PROCESSINS DATE
I FINDINGS REPOR.T SUPPLEMENT
4 FINDING ORIGINAL STATUS FOLLOW UP FOLLOW UP5 NO. DIN DESCRIPTION PL IT CA DIN CLASS.
------------------------------------------------- ------- ---
* FO 120 4075 NOMENCLATURE ERROR. NOMLNCLATURE T it a 5101. R B
IDENTIFICATION FOR VALVES9~V~1~k II~216-a I1-FCV-3-126A-6; 1-VCV-3-126B-B;I I-FCV-3-179A-B AND 1-FCV-3-1790-0
2 IS, IN ERROlR- WULlf IDENTIFICATION
3 INDICATES HPFP. CORRECT14 IDENTIFICATION SHOULD INDICATE
FnrU FRRQR LLLEfIRSIkLiLI& __________ ________
16 LINE Of REACTOR NOV BOARDS;17 SCHEMATICS AND CONNECTION DIAGRAMS.IS Airn -rF Ff)FOO1
19
?2
23
24 F0121 4076 1.CONFORMANCE WITH POSITION CE183 N 0A 5148 R A25 oF RG-1.106 REQUIRES THAT MOTOR
?6 OPERATED VALVES HAVE THEIR THERMAL0 VF RL 0A b PRTE-CIION DEVIICS ------
2B BYPASSED UNDER ACCIDENT CONDITIONS29 2. FSAR SECTION 15.4 INDICATES
__0 FAULTS WHICH CONSTITUTE ACCIDENTCONDITIONS.
34
35
37 F0123 4133 REFERENCE TVA DWG 4.5B640 SN. 147; T A Bi 5007 aREV 0. TVA DWG 45N600-3-4 IS OMITTED
--FROM 7 HE-I-.IST10 LC HE MA.-LCD-lAG BANREFERENCES SHOWN. IT SHOULD BEINCLUDED IN THE LIST BECAUSE TWO
wTITCHES, COVERED BY 1.5B640 SH. 147ARE SHOWN ON 4.5N600-3-4.
PAGE
B LAC CKAN SAS
/EIp
12
8-
D&V PROJFcT 1OS20
FCH EN GlNEERS-ARCHITECTS, MISSOURI
SEE AUTHORITY PROCESSIMSG DATE
BAR NP AR PLANTV-E ýJ L _____- -
GS REPORT SUPPLEMENT
FINDING ORIGINAL
NO. DIN
F0124 4131
DESCRIP71ON
REF. TVA DWG. 45N16313-5; REV.5THE CONNECTIONS TO TERMINALS 2-4C-ANmDE 2-4 4~IG15NI638-2FOR DEVICES LIC-3-156 AND LIC-3-164.
STATUS FOLLOW UPPL ITY CA DIN
FOLL.OW UPC LA SS.
v R B 1 5 0 08 R B
S INCEF THESE DEVICES ARE ACTUALLYSHOWN ON DRAWING 45N-1638-1; REV.2
i0125 31A36 REF.' TVA DWG46.5N600-3-2; REV. 3 Y A 5091 R ATHE INTERLOCK CONTACTS FROM TIME
_________ -DELAY RELAYS-Z4A ANDn 74-8 IN I CAI-L _________________________________
A 30 SECOND DELAY ON TURBINE PUMPRUNNING. THIS IS NOT COMPA71BLE WITHTHE 2-20 StX&ND-jt!ItjfjAhL OWNON LOGIC DIAGRAM 47W611-3-1.; REV. 2
FO126 354: 7 REF. TVA DWGS 45N600-3-3; REV. 2 AND Y R *A 51092 R A45N600-3-4 REV. 2: THERE IS NO TIMESETTING SHOWN FOR TIPE DELAY RELAYS______ ________
ISG; 2SG; 3SG AND 45G[SAME AS FO8013
371
F 012 7 4257 REF TVA DOGS 4.514600-3-3 REV. 2AND 45N600-3-4 REV. 2. THE
Y R A 5009 R A
OUTPUTS [TERMINALS IC AND 113 OFLIC-3-164; LIC-3-156; LIC-3-146
N C-37? R ~ONT E______GOING TO LM-3-164. L LM-3-164A;LM-3-156 L LM-3-156A; LK-3-148 &
LM-3-11A RESPECTIVELY.
BLACKIKAN SAS
*50*
)
)
)
[7L
PAGE
BL ACK EN EGI NdEERS-A RCH ITE CTS TENNESSEE V AUTHORITY PROCESSING DATE IKANSAS Cý . "MISSOURI WATTS BAR W AR PLANT
11 &V--&RftJl A IIC O 1012FINDINGS REPORT SUPPLEMENT
2______ _____fRGNL__
4 FINDIN(i ORIGINAL STATUS FOLLOW UP FOLLOW UP
N0.- DIN DESCRIP71ON PL TV C A DIN CLASS.
7 F0i28 4263 REF. TVA DWG 45W600-46-6; REV.4 V 0. p 5010l R ATHE CONTROL CIRCUITRY DOES NOT
'a THE "TRIP AND THROTTLE VALVE"11 [fCv-1-513. THE BYPASS IS REQUIRED
12 AS PFR TF CIRCULIAR A1-13.
13 .
14
18
F A k3O RE V TVA DWG, 45bd600-46-6; REV. 4 N 0 A 5011 R A19 AND 45N600-57-5. REV. 2 THE LIMIT
20 S4ITCH THAT ACTUATES RELAY BO WHICH21 IN~ TURN; INTERLOCKS WITH IIILkt-ELAY22 RELAY Tol IS SHOWN TO OPERATE WHEN
23 THE "TRIP AND THROTTLE VALVEn24 rFCV-1-sl) is FUlLlY DaEili. THIS DOES25 NOT'AGRE5E WITH LOGIC DIAGRAMS
26 ~46W611,-3-3; REV.. 2 AND 46W6li-3-4z.27 2__ WHIC 1E2ML IJUd. ClE EilHAI-IREHL±1flh2E SWITCH ACTUATES WHEN FCV-1-51 IS2S HALF OPEN.30
31
33
35 J 0 130 4258 REF TVA DWG 45W600-46-6 REV. 4 Y R A 5081 R A6 - ~ ~ L.&aHliATIC DI-G-Rti1ATHE CONTROL
37 CIRCUITRY FOR OPENING; CLOSING;AND TRIPPING THE "TRIP AND THROTTLE
-1 S--NAIL.E ESFCV-1 -5~1 &A N ____________
40 DISAGREEMENTS WITH THE CONTROL41 SHOWN ON LOGIC DIAGRAM 47w6ll-3-4
42 REV.. 243
46
41
9 PRESSURE SWITCHES PS-3-121A;B 9 0'o HAVE A SETPOINT OF 6.5 PSIG
51S~NAI.DE O~GiEWiHTE__________52 ELECTRICAL INSTRUMENT TA13ULATION
53 [IVA DWG 47B601-3-0 REV. 10) WHICH14- i~iALAST.~~CO 11 56 __________
55
56 PAGE
PkCH ENGINEERS-ARCHITECTSM¶ISSOURI
TL1NNESSEEWLATTS BAR
H &V PknWAUTHOR ITY'EAR PLANT
PROCESSING DAT
FINDINGS REPORT SUPPLEMENT
FINDING ORIGINALNO. DIN
F013Z 4361
DESCRIP71ON
REF. TVA DWG 45N600-57-5THERE IS NO TIME SETTING SHOWN FOR-TlMLDLhLAY-RELAV-S-T-D-1ANIDZ.D2ALSO; THE TIME RANGE OF 1-15SECONDS SHOWN FOR THESE RELAYS
SEC TD SON ON LOGIAWC DAGRA-2
47Wd611-3-3; REV. 2
STATUS FOLLOW UPPL TY CIL DIN
Y k A 5093 R A
REF. TVA DWG 4s5W600-57-26; REV.1ori AVý, A12 Amfb RI4 AuF Ppnu~ibiNL
CONTACTSOVERLOAD
TO BYPASS THE THERMALCONTACTS FOR VALVE
REV- 43; HOWEVER; THERE APPEARSTO BE NO INDICATION TO THE OPERATOR
-RHtIN iL4HF OERIC A D5-A R-L Db!fA.SiE D-*ALSO; IT IS NOT APPARENT HOW THEOPERATION Of THE OVERLOAD BYPASS
REGULATORY GUIDE 1.106.
F0135 4112 FSAR REFERENCE 8.3.1.4.1 COMMITS7O CABLE FILL CRITERIA FOR TRAY
EXPLAINS THAT A COMPUTER PkOGRAMIS UTILIZED FOR CABLE ROUTING ANDRACEWAY PLRCENT FILL CALCULATIONS.THE RACEWAY PERCENT FILLCALCULATIONS PERFORMED WITH THIS
WITH INPUT DATA FOR THE VARIOUSCABLE TYPES.
BLACKIKANSAS
FOLLOW UPCLASS.
F0133 4362 V 0"A , .5149
NO6A 5270
I~,I
54
55
PAGE
LIVIn FUN --ýLj---U3LW MU
FLH ENGINE ERS-ARCHITECTS, MiISSOURI
TENNE SSEEWATTS BARI
rat, ponf
PROCESSING DATEIAUTHOR ITY*AR PLANT
A C ;In
FINDINGS REPORT SUPPLEMENT
FINDING ORIGINAL0 ~ CR i PT ION
STATUS FOLLOW UPPL TV CA DIN
7 FO 137 4079 TRIP SETTING FOR B3REAKER NOT IN N CA, 5150 R AACCORDANCE wITH MANUFACTURER'S
9 -- Rf-ED~fAkATI N SI-S~ARSIJBS1I~ibN________10 8.3.1.1; ELECTRIC CIRCUIT11 PROTECTION; STATES THAT THE MOTOR42 CIRCUIT PROTECTOR IS SET TO PROTECT13 THE MOTOR.
15
16
17
18
19 F0139 4032 EXCEPT FOR THE INTENT AND PURPOSE T R *A 5094 R A22 OF THE ECN.THERE APPEARS TO BE TWO
27 ________ ECN&S UiTIiZING THE SAME NUMBER22 3306.23
24
25
277
28 F0140 4113 THERE IS INSUFFICIENT JUS71FICATION N C A 5252 RA U29 AND DOCUMENTATION TO SUPPOkT30 ENVIRONMENTAL QUALIFICATION OF THE31 AUXILIARY FEEDWATER PUMP MOTOR32j DRIVES.,_____________________________
37
38 FO 141 42 64 FSAR SUBSECTION 8.3.1.4.5 IDENTIFIES T R A 5053 R A
40 FCV-3-1268B-; CIRCUIT 1-3V-3-Z963-E341 CIRCUIT 1-3y-3-2963-0 THE CONNECTION
42 DIAGRAM WAS COMPARED AGAINST43 THE TERMINATION TICK~ET. CONNECTION44 DIAGRAM 45W11769-6 REV 2 INDICATES45THAT A CONDUCTOR COLORCODE OF ___________ _______________
46 W-BL SHOULD BE TERMINATID ON47 713-2B02. THE TERMINATION48 TICKET INDICATES WlbK ON TB-6. __ _______________
PAGE
ýLACK 1KAN SAS
FOLLOW UPCLASS.
5 152ý-
,H ENGINE ERS-ARCHiTECTS
MI SS OUR I
PROCESSING DATETENNEISSEE V W AUTHORITYWdATTS ARR PLANT
n~u twflal(T 1l'n7fl
FINDINGS REPORT SUPPLEMENT
FINDING( ORIGINAL,NO. DIN DESCRIPTION
ODRIGIMAL -STATUS FOLLOW UP
PL TY CA IDIN
FO0142 4307 AUXILIARY FEEDWATER PUMP 16-B Y R B 21 R B1-MTR-3-128-8; IS SERVED FROM
CIRCUIT NUMBER 1-5PP-3-662-B. THISCIRCUIT 1S A 3-lC-#2/O TYPE WNBWHICH IS A RINGjLECILN-D3ZCTOR;SHIELDED WITH BLACK JACKET. THETERMINATION TICKET FOR THIS CIRCUIT
__________~TH JIBCAF m RELADRDULIORSCOLORED 13K-W-R AND A SHIELD IS NOTAPPLICABLE. THIS IS NOT CORRECT
FO144 4CE-0 GENERIC FINDING: SOME N 0 A 5253 R AINSTAIINFNIATIIN A1&DCOLTROtS FOR THE
AFW SYSTEM LOCATED IN THE AUXILIARYBUILDING WERE NOT ENVIRONMENTALLY
___ UAtIFIFD 10 S.UiaSTANI-IAl THEIlR----REQUIRED OPERATION FOLLOWING A HIGHENERGY LINE BiREAK ACCIDENT.
FU300 30LS THE SECONDARY CHE141CAL FEED PIPING N 0 A 5213 RA 0Ebuc.. No. 47WI541a&]IJNILERLANGWITH THE AFW IS DESIGNED TO 50 PS16AND 75 DEGREE F; PER NOTE 10 ON THE
DRW~GJILAE~~z NI~ATNDEVICE IS A CHECK VALVE AND PIPINGDESIGNED TO 11B5 PSIG AND 600 DEGREEF9 A . A, AEILL-IhfaM P A T I AI IT Y
EXISTS AT THIS JUNCTURE.
PAGE 11
BLACKiAN SAS
FOLLOW UPC LASS.
Al ENGINEERS-ARCHITECTSMISSOURI
TENNESSEE VW~ATTS BAR
13&V PRO
PRDCESSING DATELAUTHORI TYR PLANT
FINDINGS REPORT SUPPLEM4ENT
ORIGINAL
F INIINb ORIGINALNO. DIN DESCRIPTION
STATUS FOLLOW UPPL TV CA DIN
F0 303 3527 IN THE ACCIDENT ANALYSIS FOR A MAJOR T 0 8 5105 R a3RUPTURE OF A MAIN FLEEjWATER LINE IN
FA SECTION ¶ k2.THE ElLAP -ED10 TINeE BETWEEN REACTOR TRIP AND THE11 TIME THE AUXILIARY FEEDWATER SYSTEM
12 sCPBEO ROIIGSFIIN'3 FLOW TO R EMOVE ALL RESIDUAL HEAT,
GENERATED BY THE CORE IS SPECIFIED______~As 1679 SECONDS-tLHJME-ELS-C-RIPTION
16. AND AS 1830 SECONDS IN TABLE 15.4-917
18
19
F 0310 DIRECTION NOTED FOR SUPPORT AT JOINT122 ON DOCUMENT 85M47B427-543 RO
OSa 5054
VULSa nU LJUfh ,ILjjf XU MA* -L
DENOTEDON'0 ISOMETRIC DRAWING65N4?427ý-2O6 R4 AND DIRECTION:
_________~~~~~~E ____ 01fEE iN, r TIf E._________________EXECUT10ON 2 DATED82101130 14.21.28 ON TVA ROLL 9195
31 fo~19 35138 THE VALUES REPORTED ON REVISION 0 Of N C A 5214
THE ANCHOR DESIGN TA14LE IN TPIPEPRINTOUT ON TWA ROLL 484E. HOWEVER A
-- LkTE4R-R-iV4-I-I ON-2--MA S--&UPPL4-Ii-N-IWHICH THE VALUES DO NOT ALIGN WITHTHE TPIPI. ANCHOR LOAD TABLE
R 0
3233
35
36
39
40
511
'3ý
61
Gs
fil
BLA CKKAN SAS
FOLLOW UPCLASS.
39
49
49
93
99
2L41 EATCH ENGINEERS-AkCHI TECTSKAN4 iTY, MISSOURI
IENNESSI
- -FINDINGS
P LEYV AUTH3RITYljCLlAk PLA14TJECT 1052CPORT SUPPLEMENT
FI'JDING ORIGINALNO. DIN
0O 321 3549
DES CRIF TI 1N- - - - - - - - - - -- - - --- - -
iFSAR -TA3LE 15.2-3 STATES IN A
FOOTNOTE THAT; "SECTION 6.5 GIVES
THE INTERFACE CRfIlTER IA FOR THE
AUXILIARY FEED6ATER SYSTEM".
HOWEVER; THERE ARE NO AFUS
INTERFACES CRITERIA GIVEN IN FSAR
ORIGINAL.STATUS FOLLOW UP
PL TV CA DIN
V R 8 5012 R a
,SECTION 6.5. ETHiSIR IS THE RESULTOf FOLLOWUP ITEM 1112 ON ORR 1150;ESAR 15.2.- LOSS oF NORMAL FEEDWATER__________
20
21 -F0-324- 3542 THE VALUES REPORTED ON REVISION4 0 OF N C A 5215 R A22 DOCUMENT 85M47B427-450-O CORRESPO-ND23 DIRECTLY TO THE ANCHOR DESIGN TABLE
24 IN THE TPIPE PRINTOUT FOR NDOE 29525' ON TVA ROLL F,465. HOWEVER A LATER
26 REVISION 2 WAS SUPPLIED IN WHICH THE
ý20 VALUES DO NOT CORRESPOND TO THE _ _ _ _ _ _ _ _ _ _ _ _
29.28 TPIPE -TABLE.
'30
3,
T9
34 FD!2B 31915 THE DESIGN PkESSUkE AND TEMPERATUR-E Y R A-551 -RA35 FOR THE FOLLOWING VALVES ARE36 1975 PSIG AND 120 DEGREE _______-______
*- &. -J 1U~ -00; L V U O UJ0.
164; 171; 1-LCV-3172; 173; 174AND-175.-THE-PROCUREMENT ________
SPECIFCTO NIAE 60PIAND 100 DEGREE F. SEE TVA SPEC.1643; CONTROL VALVE SPECIFICATION
__ 10333 35 53 THE MOTOR SECTION Of THE INGERSOL Y R A 5106RAND INSTRUCTION MANUAL; VOL.-i 1 O-RTHE AUXILIARY FLEDWA1IR PUMPS;--- - CCEPTEL, FOR USE" ON 12112119--;INDICAT-Et TH-IAI --THL ibER rRNI-sHEL-6FOR THE MlOTOR DRIVEN AUXILIARYFEEDWATER PUhPS ARE RATED LOCHP.
PAGE 1
PROCESSING
FOLLOW UPCLASS.
'/D2/84
13
3 L A1WVEAKANS1 C ITi
FlND1146 ORINO.
F0335
ILII ENQLNEIRS-F4CHIILCTý 7LN4JLSS~qjLLEY AUTHORITYMI~1SSOURI 6ATTS BAR ~EUCLEAIR PLANT
U&~LPIQIE~C. ..... .___...__FINDINGS REPORT SUPPLEM~ENT
ORFIGiNAL -l--,--61 NAL STATUS FOLLOW UP' FOLLOW UPDIN bESCRIPTIODN PL TV CA DIN CLASS.
----------- -------- - - ----- - - ----- - - --- - - -- - - ----------------- ---932 SEVERAL VALVES FOR PROEbLEM N 0 A 5107 R A
0600200-05-01 ON ISOMETRICV47~Z-2 : 1.8_ R E. 0, -4 HAVE E ACC EL LR ATIODNS _____________
WId~CH EXCEEb THE 2 6 VERTICAL. ANL3 G HORIZONTAL ALLOWA(3LES.
F0336 3933 SEVERAL VALVES FOR PROBLEMn600-50 HAV r.kESii Y 0 A 5108
PROCFSSING D
R A
WJHICH EXCEED THE 0.76 SY ALLOWABLESTRESS.
F 0340 3935 THE MOVEMENT IN THE V DIRECTION AT I R A 5829t Of Q". REP OR TE D1N ~ ___________ _________________
DOCUMENT 47B427-3E8 R3 DOES NOTCORRESPOND TO THE VALUE OF .5"INDICATED BY JyPIP DYNAMIC SNUbBERDESIGN TABLE IN RIJN 2 DATED 0710218016.08.15 ON TVA ROLL 8417
F U3 41 3936 THE'MOVEMENT IN TH4E 7 DIRECTION AT V R' A 5086 R AJOIThj 2-o-F-.s RPREt!~_ _________ ______ ______DOCUMENT 47B427-387 R3 DOES NO0TCORRESPOND TO THE VA~LUE OF 1.34"INDICATED BY TPIPL. SUPPORT DESIGNTABLE IN RUN 2 DATEV 07102/8018.08.15 ON TVA ROLL 8417
PA GE
02/3'2/B4
71
14
BLACK EKANSAS C
FIN ENGINEERS-ARCHITECTSIMISSOURI
FINUIiiG ORIGINALNO. cI N
PROSSNG ATE *01e4TENNJESSEE VW AUTHORITYWAITS BAR A PLANT
(SV _PR OJET_02FINDINGS REPORT SUPPLEM~ENT
DES CR 1IPTIO0
-ORIGINAL.. ___
STATUS FOLLOW UPPL IT CA DIN
FOLLOW UPCLASS.
THE SUPPORT DESIGN LOAD VALUE Of-1650 POUNDS kEPORTED IN DOCUMENT_ bA42UDFJl_ FO. PRODFk0lEMN3_-14A~AT JOINT 133 FOR A VARIABLE SPRINGCAN DOES NOT CDRRESPONG TO THEVALUE OF -12Z72 POUDiS FOUND IN THELVARIABLE SUPPORT DESIGN TABLE IN THETPIPE PRINTOUT FOR PROBLEMS N3-3-4AON IVA ROLL 9420.__THE VALUE_____REPORTED IN THE TPIF' PRINTOUT FOROVERLAPPING PROBLEM 0600200-02-05 ON
N 0 A 5152
__________ ~ ~ Uw e n ugsL, & w_________________n_______
19 AGAIN DID NOT CORRESPOND TO THE.?c REPORTED VALUE OF -1650 POUNDS.
47 4310 SUBSECTION 3.7.3.8.3 OF THE FINAL- SAFETY ANAL! SI S.R E PORT-.1 N 41 CTES~
PIPING SUPPORTED BY- ALTERNATEANALYSIS WILL HAVE RECOMMENDEDMA~XIMUM SUPEQeLPAClNG iANDCORRESPONDING HORIZONTAL ANDVERTICAL SUPPORT REACTIONS. THERE
- ------ ----- _ . APPEARS TD BE NO EVIDENCE OfCALCULATIONS WHICH INDICATE THEVERTICAL AND LATERAL SUPPORT SPACINGUSED ON THE PUMP RECIRCULATINGPIPING BETWECEN THE FP1GOROUSLVANALYZED PIPING AND THE AUXILIARY/
- CNTRL DILDINGWALL; ETSTHEABOVE CRITERIA.
N 0 Aý' "5216
FoS_1 4034 THE NOUCONFORMANCL. REPORTS WE:N NEB V R A 50956111 ETVA NE6611124b76 L
W I I1!~1 DISCUSSES EC14'S 1:1225_________P. 3075 WHICH CALL FOR A SET POINT Of1215 PSID FOU THE MOTOR-DRI'dEN AUXf EEDWATER__fUMP -RUN OUT -P _RDO-T ECTI -ONPRESSURE CONTROL VALVES PCV 3-122AND PCV 3-132 WHICH CORRESPONDS TO A,
_PUJMP__FLOUW__ATE Of 55C LIM._______
PAGE 1
F0346 3941
F03
52
03
PROCESSING
15
BLACK tFCH EfNGINEERS-ARCHITECTSKANSA C~l mISSOURI
F IN vi IN GNO.
F0352
PROCESSINGi DATETENNESSEE IW AUTHORITYb.ATTS 13AR CJ'A R PLANT
D&y PROJECT 10520 ____
FINDINGS REPORT SUPPLEMENT
ORIGINAL
OkiGiNAL STATUS FOLLOW UP
DIN DESCRIPTION PL TY CA DIN---- ----------------------------------------- -------
4035 THE VALUES FOR AUXILIARY FUEEWATER Y R A 5096FLOW TO THE STEAM GENERATORSFOLLOWIN "SPECIFIED ACCIDENTS/TRANSIENTS W~ITH SELECTED SINGLEFAILURES GIVEN IN TABiLE 3-1 OF TVA*SLETTER TO THE FARC PROVIDINGADDITIONAL INFORMATION IN RESPONSETO NRC CONCERN iTEM E.D; NRCkiA.1tiLAlYSISTEMS BRANCHCON4CERNSON THE DESIGN OF THE AFWS CLETTERDATED DEC. 15 1961) [TVA FILEkA27B1121502Z] DO NOT MATCH WITHTHE WBN AFWS DESIGN CALCULATIONSPROVIDED FOR REIVEW.
FOLLOW UP
CLASS.
R A
F0357 4311 RESTRAINT 03E.-IAFW-R55 REV- 1WHiCH.ATTACHES TO A HORIZONTAL PIPEWAS MODELED IN THE COMPUTERANdALYSIS A RIGID RESTRAINT IN THEVERTICAL CYJ DIRECTION ONLY. THESUPPORT PER THE ABOVE DRAWINGALSO RESTRAINS THE PIPE IN THEAXIAL AND LATERAL DIRECTION.
T 0 A 5217
F0358 4200O RESTRAINT _O3B,-1AFy_-V57;_ A VARIABLESPRING; HAS A TP1PE COMPUTER DESIGNLOAD OF -540 LBS. THE LOAD PER THEABOVE DRAOING IS -110 LBS.
N 0 A 5218
RESTRAINT 03b-1AfW-F65 Rl 14DICATES Y 0 A 5109A SOID STRUT ASSEMBLY. THETPIPE COMPUTER ANALYSIS [N3-3-5AJINDICATES THE RESTRAINT IS ADYNAMIC SNUBI IR.
___F0359 431 2
PA(.E
F (H ENI NNE ERS-ARCHiTLE TS,MISSOURI
PRCES III DTE 1* 14TENNESSEE W AUTHOR ITYWATTS bjAR W'AR PLANJT
BLY PROJECT 10ý20
FINDINGS REPORT SUPPLEMENT
ORIGI NALD IIt
4314
DESCRIPTION
RESTRAINT 03B-IAFW-68 RO IS ARIGID STRUT ASSEMBLY. THE TP1PE
-- C,.EIIEkAHiAL YSI.51ANUC AIL5-AJRESTRAINIT IS A DYNAMIC SNUBBER.fMv3-3-5A]
RESTRAINT O3B-1AFw-72 RI IS A
ORIGINALSTATUS FOLLOW UP
PL TV CA DINFOLLOW UP
CLASS.
Y 0 -A 5110 R A
Y 0 A 5111
RIGID STRUT ASSEMBLY. THEL ,IPrPCOMPUTER ANALYSIS tN3-3-SAJINDICATES THE RESTRAINT 1S A
F062 435- RESTRAINT 03B-lAFW-r(74 Ri IS ARIGID STRUT ASSEMBLY. THE TPIPECOMPUTER ANALYSIS EN3-3-5AJ
_______INDICATES THE RESTRAINT IS A DYNAMICSNUBBER.
V a A 5112
RESTRAINT 47A427-3-5 WHICH WASANALYZED ON TPIPE FOR PkOBLEM
~31~IAHA~NOT EEN IN TLLED.
Y 0 "A 5153
416 S UP9fE 0RWN 1-4-13 IPROBLEM 06002(GO-O5-02 ON ISOMETRIC47w427-219 RO bOES NOT ALLOW .4"
11~EHN F IEIN THE 2 DIRECTION
AS ANALYSED IN TPIPE ANO REQUiIkEDBY ESAR 3.9.3.4.2 C PAFiT 4.
V 0 A 5219
3LA 0,KAN SAS
F I NDINGNO.
ro 360
10361
F0363 R A
PAGE
L
,SNUBBERt
PROCESSING
tH ENGINEERS-ARCHiTECTSmiI S S OUR I
PROCESSING DATETENNESSEE VI ATORTW~ATTS OAR NA AR PLANT
tiL Ponlr-rT lIj',-O
FINDINGS REPORT SUPPLEMENT
FIN~iN6 ORIGINALNO. 1)IN
_______________ OR 1NSTATUS FOLLOW UP
DESCRIPTION PL TV CA DIN
F0365 4331 TPIPE PROGRAM FOR PROBLEM N3-3-4A ON N. C A 5220 f
TVA ROLL 8420 MODELED A RIGIDS T 1RAI T fiL1 DUUCT ION- AT -JOINT
619 1038-IAFW-RZ213o BEC.AUSEA U-BOLT IS INSTALLED TIGHTLY AROUNDTHE PIPE THE FREEDOM TO SLIDE IN THE
X AND-1 DIRECTION IS NOT PROVIDED
15
16
Il
18
9 P0366
21
22
4317 THE ORIGINAL RESTRAINT DRAWING03B-iAFW-i225 WAS TECHNICALLY
INDICATES THIS RESTRAINT WASCONSTRUCTFED PER FCRH 7Z13. FCRH 7213
___ AS REJECTED BY SWP APRIL 82.
F103:6 7 at. etyr Etre t~ 0r61trr, 1,1tlrATrC4.) [14 UI~ JS*L **LLV ILVC LWa**MAtfl*t.
THERE IS NO CLEARANCE BETWEEN1120 PLATE ON PIPE. CLAMP AND PIPESLEEVE IN WALL FOR 03bw1AFW-RI49.TPIPE PRINTOUT AND DOCUMENT4.7b427-471 RO INDICATE PIPE AXIALMVMENU~TF1 Of 0l.4n AT JOINT 321CHANGER'LOCATloN3. FSAR 3.9.3.4.2C PART 4 INDICATES PIPE MOVEMENTSSHALL'BE ACCOMMODATED BY HANGERS.
TH..... RE"- A!PPEARS-TO bE NO-RECSTRA-INTDRAWING FOR THE X, Y RIGID RESTRAINTAT NODE 5C SHOWN ON ISOMETRIC47I.4I27-205 A5. THERE, IS A. BOX FOl6THE RESTRAINT NUP~bEI; HOWiEVER; NONEHAS BEEN FILLED IN. THIS RESTRAINT
HAS jjN!10ELE INTHETPIPE _
ANALYSIS. THE ACEEPIA61LITY OF THISRESTRAINT CANNOT Of DETERMINED ATTHIS TIME. __ __
N C A 5156
BLACK L'qKANSAS C
FOLLOW UPCLA SS.
N 0 A J%NA ~J
I~ ( A
- 19369 4 332, R A
PAG(E
ArrFPTA MEVER FIELD REVIEW
UN allL FAELýV -L AL- - - I . I I IIt of ATEC N r A 5155
14A Q
4.ý L) 4 _
BLACK * CH ENGINEERS-ARCHITECTSKANSAS MiY,~ISSOURI
FINDING ORG1GJJALNO. DIN
f 0370 4 3 15
TLN NESSLEEWATTS BAR
ii&V PFFINDINGS I
PROCESSING DATE'AUTHDRIIWFEAR PLANT
T 10520T SUPPLEMENT
______________ORIGINAL
STATUS FOLLOW UPDESCRIPTION PL 1Y CA DIN
- - -- --- ------------------- --- -----
RESTRAINT DRAWING 03B-2AFW-RL237REV. 1 HAS DESIGN LOAGS Of +5000 LBS
-AND 40DO~ LB THL-cOMp-UiER .....GENERATED DESIGN LOADS PER47Ei4Z7-512 REV. 0 IS +(300 LOS AND
FOLLOW UC LASS.S
N i A 5221 R A
FO0371 4333 RESTRAINT 47A450-3-67 HAS A DESIGN N C A 515? R ALOAD OF +760 LBS AND -660 LOS PERTHE TPIPE ANALYSIS. SEE DRAWING
_____47B427-513 RO. THE DESIGN LOAD ONTHE RESTRAINT DRAWING 1S +60 LBS AND-30 LBS.
F0372 '.319 IPIPE ANALYSIS PRINTOUT FOR PROBLEM T 0 A 5113 R A
________N3-3-4A LISTED LOADS IN Z DIRECTIONEQUAL 70 +4901 AND -60OOV FORRESTRAINT 03D-IAFW-R'37 AT JOINT
__________ 127..THE RESTRAINT DRAWING __ ________________
INDICATES LOAD VALUES OF +360N AND-3601. THE BILL OF MATERIALS ON THERESTRAINT DRAWING IS INCOMPLETE INTHAT IT ODOES NOT CALL OUT THESIZE Of THE SNUBBER. WITHOUT THE
________ ~lZE f~THE__SNUBBER THE RATED LOAD___________CANNOT BE DETERMINED ANI) RESTRAINTMAY OR MAY NOT FUNCTION AS ANALYZED
PAGE 119
-5700 LBS.
VrCH ENGINEERS-ARCHITECTS, MISSOURI
PROCESSING DATTENNESSEE IW AUTHORITYr6ATTS BAR ~EAR PLANT
AU&V PROJECT 10520-FINDINGS REPORT SUPPLEM4ENT
FINDING ORIGINALNo. D I N
F0373 41C62
DESCRIPTION
THERE IS NOSUPPORT.THEmce~ft va, 1ur
DOCUMENTATION TOOPERATING TEMPERATUREPILPE STRE4SSANALYSIS
-AHji fN AL-STATUS FOLLOW UP
PL TV CA DIN
V 0 A 1 5254
Of THERMAL EXPANSION. THE MAJORITYOf TEMPERATURES USED FOR THERMALAVALYSIS COarrESonDE H
TEMPERATURES ON IRE FLOW DIAGRAM.DURING THE REVIEW IT WAS NOTED.THATSOME PIPING WALS ANAA YL~E~TEMPERATURES INDICATED ON THEFLOW DIAGRAM.
ED 374 4334 REVIEW OF FIELD COMMENTS FOR V 0 A 5013 R ARESTRAINT 1-03B-78 REV. 903INDICATES STRUCTURAL MEMBERS HAVEBEENk R EDUCED TO 2"X2" TUBE FROM
~"X~ T~i~.THF ABILITY OF THERESTRAINT TO WITHSTAND THE DESIGNLOAD; BASED ON THE STRUCTURALCHANGESO SHOULD BE DEMONSTRATED.[ALSO SEE F09233
70U7 IN DOCUMENT CE3fi20810002; A MODELOF THE CONTAINMENT VESSEL IS
o CE LP~f~[ 23f MjASAý N1T1IN THE FSAR; SECTION 3.L.2.4; A 13MASS 1S IDENTIFIED AS THE ONE USEDFOR THE DYNAMIC SEISMIC ANALYSIS.THE DOCUMENT IS NOT IN COMPLIANCEWITH THE FSAR ALTHOUGH THE MODEL
ACCEPTABLE.
V R a I2
3LACKK AN SAS
FOLLOW UPCLASS.
R A
F 0502
PAGE
3LkEK WC" EN1GINEERS-ARCHITECTSKANSAS CTVY NI SS OURI
PROCESSING DATTEN~iESSEE qW AUTHORITY
k6ATTS 6AR EAR PLANTIA.V PROJECT 1052C
FINDINGS REPORT SUPPLEMIENT
FINDING ORIGINAL
NO. D0114
F0503 31C~5
DESCRIPTI ON
IN THE GENERATION Of FLOOR RESPONSESPECTRA FOR THE CONTAINMENT VESSEL-[C,"PUXEi-JOL- 1--1B/ QiI43I4~1TO 19:46 MiCROriLMED OH REEL 6771]THE EARTHQUAKE ACCELERATION TIME-nHizTBrIE ArE NO LSTED; NOR ARE
STATUS FOLLOW UPPL TY Ch DIN
NO0R' 5114
RESPONSE SPECTRA GENERATED FOR THESEINPUT MODTIONS. THUS THERE IS
----- - -ilI S &FrI TfLICII EAU LjjTAM-AMl -- I{"P U T_____ ____
MOTIONS ACTUALLY UJSED SATISFY FSARSECTION 3.7.2.1
F0504 3731
f D506 40-17
THE 5% MINIMUM ECCENTRICITYCOMMITTED TO IN FSAk SECTION3.7.2.1.1 FOR AXISYMI1ETRICSTRUCTURES WAS NOT CONSIDERED IN THEMODELING OF THE CONTAINMENTVESSEL[DOCUMENT CEB 820810002 R03 AND THEDEVELOPMENT Of FLOOR RESPONSEqPRCTARA. BARED ON THE TWA RESPONSE
N C A -5115
Of 11103182; THIS FINDING HAS BEENCoNif IRMED
NCR WBNCE3 8203 ADDRESSES THE V 0 'A 5097
EMBEDDED PLATES. THIS FINDING ISISSUED TO DOCUMENT THE FACT THATTHE WORK IS NOT YET COMPLETEDTO CLOSE OUT THE NCR. THE FINDINGWILL REMAIN "0" UNJTIL ACTION IS
FOLLOW UPCLASS.
R A
R A
PAGE
WCH ENGCINEERS-ARCHITECTS, -MISSOURI
TENNIESSEEW4ATTS BAR Nr
HLV PROJECTFINDINGS REPORT
PROCESSING DATEAUTHOR ITYAR PLANT10520SUPPLEMELN T
FIN DIN GNO.
ORIGINALORIGINAL
STATUSPL TY CADESCRIPTION
FOLLOW UPDIN
FOLLOW UPCLASS.
-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10508 3554 CIVIL DESIGN STANDARD DS-C6.1 REV. 1 N 0 A "52 55 0l. 0
DOES NOr ADDRESS THE DESIGN OF THE_______ ~BASE PLATES. CEB REPORT 79-18 MAKES ______________
CERTAIN DESIGN RECOMFIEIDATIONS FORBASE PLATES BUT THEY WERE NOTINCLUDED IN THE DESIGN CRITERIA. WEWERE INFORMED BY TVA [INFORMALMEMORANDA3 THAT FLEXIBLE BASE PLATESARE DESIGNED USING "STRUDL".'ý"BASEPLATE"; ETC. AND RIGID BASEPLATES ARE DESIGNED USING BAP222.
F0511 39'.2 1IN THE REVIEW Of THE TPIPC ANALYSIS N 0 A 5223 0l. 0
S Of PROBLEM N3-3-IOA; IT HAS BEEN7.- NOTED THAT THE INPUT SPECTRA HAVE
NOT BEEN PROPERLY BROADENED ASREQUIIRED BY FSAR SECTION 3.7.2.9Two SPECIFIC TYPES OF PROBLEMSHAVE BEEN DETECTED. SHEET 2 SHOWSA COMPARISON OF THE "L4ROADENED"SPECTRUM USED IN THE TPIPE ANALYSISA6AINST, THE "ROUGH" SPECTRUMREPO RTED IN TEHE EDS REPORT ON THEAUXILIARY BUILDING SEISMIC ANALYSIS.
F10513 4365 IN THE PIPING ANALYSIS; SPECIFICALLY N '0 A 5 116 -k RA- _______
PROBLEM N3-3-3A, SEISMIC LOADS HAVEBEEN GENERATED THROUGH THE USE Of
44 SIMULTANEOUSLY IN DIFFERENT SEISMICZONES Of THE PIPING PROBLEM. AT
46 EACH FLOOR; DIFFERENT SFCCTRA ARE47 USED. FSAR SECTION 3.7.2 ONLY
44 PROVIDES FOR THE USL OF49 THE WORST SPECTRUM APPROPIATE TOso THE SYSTEM.
PAGE
BLACKIKAN SAS
0
0
3
0
BLACK( F~C1H EGINEERS-ARCHITECTSKANSAS C"T'Y, 1415SOURI
TE.NN'ES SEE VWATTS BARN E
IiC.V PROJFET
PRDESI'S ATE I 14AR PLANT10520
FINDINGS REPORT SUPPLEMENT
FINDING ORIGINALNO. DIN
STATUSPL TV CADESCRIPTION
F0700 4038 HANfGER 03B-lAFW-R200 OAS NOT BEEN v o A 50 1 R AINSTALLED
10701 40L9 HANGER M47A427-4-1 HAS NOT BEEN v 0 A 5015 R A_______________ INSTALL.ED _________________
HANGER'W4A427-4-2 HAS NOT BEE-NINSTALLED
V 0 GA 5098
F0704 4201 HANGER 03B-1AFW-R100 OVERHEATED BEAM N 0 A 5224 R AWITH WELD 40-10" DIM IS 2`11"
_______ ____----_ADDED f." TUBE STEjj1ffANGER FORCONDUIT
3732 GROUT MISSING FROM SOME OF STANDARD V 0 .ýASUFPORTS FOR MISCELLANEOUSJN~iRTAT IQN PIPIJcG-UNDER
6ASEPLATES. THESE SUPP'O1TS ARE FIELDLOCATED. DWG NO 4IN315-2 R5
52Z5
HANGER 03B-1AFW-R231 ITEM 2 NOTWELDED ON INSIDE ITEM I NOT WELIpLDON EASE SIDE OF EMBEDMENT PLATE
Y 0 A 5099
FOLLOW UPDIN
FOLLOW UPCLASS.
A040
-FO 714
F0718 4271
54
55.
Rh 0
PAGE
PROCESS14G
V (H ENI~G NEER S-ARCHITIICTS2 MISSOURI
PROCESSING DATETENNESSEE Vý AUTHOR1TVkAT7S BAR NW1AR PLANT
FINDINGS REPORT SUPPLEMENT
3 _________ORIGINA L-__ ______________
4 FINDING DkIGI'4AL STATUS FOLLOW UP FOLLOW UP5 NO. t I N DESCRIPTION PL TI CEA DIN C L ASS.
7 F0719 4272 SUPPORT 47A-427-1-1 GROUT UNDER T 0' A '525S6 R ABlAS.EPLATES IS CRACKED AND CHIPPED
____ ~ LD4SE. DWG NO 48NIZ19-2 REV, 15 _____________
12
F1Q720 4041- GROUT MISSING FROM SOME OF STANDARD 1 0 A 51 R A
SUPPORTS FOR MISCELLANEOUSINSTRUMENTATION PIPING-UNDER BASEPLATES. SOME SUPPORTS ARE NOT CINCHANCHORED TO FLOOR. THESE SUPPORTSARE FIELD'LOCATED. DUG. NO.
__F [0 721 4042 PIESPPORT R69-NUI AT ORHWST T 0R 18CORNER OF BASE PLATE NOT TIGHTENEDDOWN-NO WASHER UNDER NUT-AT THIS
______________TIME DOUBLE NUT ON BOLTS. NEED TOGROUT UNDER BASE PLATE.DWG NO. 48N1219-2 REV 15
F0726 4193 HANGER 038-IAFW-R232 ANGLE OF ITEM N 0 A ý5016 R A_______ rl. ~IS 6 DEGREE 52@ GENERAL _______________
CONSTRUCTION SPECIFICATION NO. G-432.9.3 HAS * 2 DEGREE ALLOWABLE.
f 0 727 41,19 HANGER 03B-lAfgI-R97 5/8" U-BOLT USEDNOT TUBE STEEL & ANG~LES HANGER ISFREE TO SLIDE
TO0 A 5272
PAGE
3LACK tsKAN SAS
GROUT MISSING FROM SOME OF STANDARD
48N1219-2 REV 15
~J BLACK 1KANSAS tfTl
'H [N GINEERS-ARCHITECTSMISSOURI
PROCESSING DATETENNESSEE V A U THORITYiýATTS BAR '~ A k PLANT
bFLV PROJECT 10520FINDINGS REPOR'T.SUPPLEMENT
NO. D I
50U732 i414
14A L STATUS FOLLOW UP
LESCRIP1ION PL TV CA DIN
FOLLOW UPC LA SS.
HANGER D30-IAFW-RI09 51B- U-BOLT V 0 A 5017 R AUSED NOT TUBE STEEL & ANGLES.HANGER IS FRE-E TOSLIDE________________
4C45 HANGER 039-1AFW-R174 _________ 01 A 5159
4--2 118 -DIM IS 69-0"; 5--0" DIMIS V'-10"; 7531-3" ELEVATION IS
(J -. Ifl* C L" T m
STEEL
FO0734 4335 HANGER 038-lAFW-Rl&7 COTTER PINS V 0 5018 R A14ISSING AT LOWER END ATTACHMENT
4202 HANGER 038-lAS W-Rl50 ITEM 1. ANGLES y 5100 R A
8 DEGREE 21. IN EASI/WEST DIRECTION _______
F077 4O3 HANGER 038-1AfbI-R515 ITEM 1. _[HANGER ROD] HAS NOT BEEN INSTALLED
T 0 A 5019
42C HI6R -0339-l-A Fh- R2-33, LOCA 11ON PLANREQUIRES DIMENSIONA1L REVISIONSF-01 1121' TO BE REVISLD TO L3'-6"AND 1'-11" TG BE REVISE TO 6" ITEM1. CHANGER ROD] ANGLES 6 DEGREE It'IN UP/bDWN DIRECTO
I31
FO0733
27
28
37
F 0 736
F,0 41 N 0 A 52 R A
PAGE
B LACK *8 01 EN GINEERS-ARCHITLCTSKANSAS CTY*l MISSOURI
TI1NESSEE AUTHORITYiwAFTS BAR WJ~EAR PLANT
F114DINGS REPORT SUPPLEMENT
PROCESSING DATE
FINDING ORIGINAL
NO. DIN
10742 4336
STATUS FOLLOW UPDESCRIP71ON FL 'TV CA DIN
-- - - - -- - -- - - -- ------------- - -----
HANGER 474427-2-2 NEEDS TO BEREVISED PER FCRH-8382 ADD PIPE LUGSryiTis 01 Awnh laFVIE D1iMENSIONI
N 0 A 5160
FOLLOW UPCLASS.
62 9 112" TO 7' 8"
6 F0 746 4121 HANGER 47A427-2-28 DRAWING NEEDS TO Y R A 5227 R A7 BE CHANGED TO REFLECT THE AS BUILT9 HANGER
'2
'~T0747 4336 BOX ANCHOR HANGER 85M47A060-3-3 N 0 A 5228 R A'5 ~ 10O'0"'DIMENSION IS 6*-6" ADDED
BRACE PLATES [ALSO SEE f08593!7
42 t 0748 12 2 HANGER-BOX' ANCHOR 65M47A060-3-6 Y :0 A 5020 R A
33SUPPORTS ATTACHING BETWEEN BOX _________________
34 ANCHOR AND CONCRETE AT COLUMN ROW S35 HAS NOT BEEN INSTALLED
37
38
49
11 F749 4207 HANGER 03B-lAFW-R1Z ITEM 1. Y 0 A 5161 R A
42 [HANGER ROD] HAS 14OT EiEEN INSTALLED43
~J0751 4051 -HANGER 038-lAfW-R.11( THE INSIDE WELD-BETWEEN ITEMS 2 L 3 HAS NOT BEENMADE. ON ]HE DRAWING THi ELEVATIONi1- LOOKING EAST-NOT SOUUT1
PAGE 26
Y R A 5116 R A
i970
3LACK OWCH ENGINEERS-ARCHITECTSKANSAS CiTY, MISSOURfI
PROCESS12.d; DATETENNESSEE 4W AUTHON17YWATTS BAR N EAR PLA14T
r.r Af14f
FINDINGS REPORT SUPPLEMENT
__________ _____ - ~OR IGISiAL - ______
4 INDIlJG ORIGINAL STATUS FOLLOW ur FOLLOW UP
5 NO. DIN DESCRIPTION PL TY CA DIN CLASS.
7 10753 4205 HANGER 03B-1AFW-RI20 HANGER TAG T R B 5229 R aAND DRAWING NUMBER SHOULD READ
"3-AEW-R1ZO --NoLQIB-AFW-8120
13
'~ 1oj5~ 433~ HANGER 039-1AL9-Y207 V-7 314- N C A -5162 RA_ _________________
16 DINENSION IS 71-3 51817
18
191
F 07W7 4320
F0758 42
HANGER 03a-lAFW-R227 MORE STEELBiRACING THAN SHOWN ON DRAWING
N 0 A 5257 RA 0
LALSO SEE ru.3ooa
PORTION OF CONCRETE WALL BEHIND v 0 A 5021 R ACINCH ANCHORED PLATE CLOSEST TOREACTOR CL FOR HANGER 27 HAS BEEN
C~iP~b.REFER TO D66 4SN955-3REV. 2 FORt LOCATION Of WALL THATPLATE 1S ATTAHCED TO.
FD759 426~9 DRAWING 47W427-2 NEEDS TO BEREVISED TO REFLECT CHANGES IN
N 0 A 5230
COND. LINE FROM 31 0" LAST Of A3 TOSLEEVE IN FLOOR AT ELEV. 713-0"
F07tO 4535 HANGER 39 @ ALP1ITH 216 DEGREE-3L'AND_ EL EV AT ION 729-11l 7/16" ON CnANEWALL HAS 1 BOLT MISSING AND 3DOLTS LOCSE ENOUGH 70 TURN 3Y HAND'ONPL.ATES-CijNCH ANCHIORED2 TO WALL.
Y10 A 5022
R A
Rt 1
PAGE
FrIN EhGINIEERS-ARCHITECTS9MlSSOURI
TENNESSEEWWATTS bAR W
PROCESSING DAYA U THO0R 1iTYAR PLANT
FINDINGS REPORT SUPPLEMENT
ORIGINAL______________
4 FINDING ORIGINAL STATUS FOLLOW UP FOLLOW UP
5 NO. D.1I!J DESCRIPTION PL TV CA DIN CLA SS .6 - -- - ----------------------
F0762 4.054 THE DRAIN LINES FOR THE AUXILIARY V 0 A 5119 R AFEEDWATER MO7OR DRIVEN PUMPS HAVESUPPORTS ATTACHED-O TILHEM BUT THESE _________________
10 SUPPORTS ARE NOT ANCHORED TO THE
:111 STRUCTURAL FLOOR.
E-0763 4055 HANGER 038-IAFW-RZ02 REVISED HANGER N C A 5163 R A
.F0764 4056 HANGER-ANCHOR 65M47AG60-3-1 BRACE V 0 A 5231 R A
RUNS FROM HANGER DOWN TO THE WALLNOT, UP.
FO 767 434fl HANGER 033-2AFW-R3 ITEM 3; 4 9 5 NOTUSED-REPLACED WITH EMBEDMENT PLATE96-0" DIMENSION IS 10'-5"
N C A 56 RA
13
48
49
4057 HANGER 459 2 AZMITH 193 DEGREE-230 V 0 A 5023 _ RAAND ELEVATION 754'-7" ON CRANE WALLHAS GROUT MISSING FROM UNDER BASEPLATESANCHORED TO WALL BY PHILLIPSCONCRETE ANCHORS-HANGER NUMBER IS1-03A-459 HANGER LOCEATED ONFEEDWATEk LINE____ ______ ___________
3LACKKANSAS
PAGE
57-1 __
R A
3LACK IC ENGINEERS-ARCHITECTS TLNdLSSEE AUTH3RITl PRDCESSIN5 DATE4
KANSAS tY, MI1SSOURI WAITS BAR IO EAR PLAN4TI&V PROJECT 10520
FINDINGS REPORT SUPPLEMENIT
3 ______ ____ ORIGINAL________
4 FINLOJNG ORIGINAL STATUS FOLLOW UP FOLLOW UPNO. DINi DESCRIPTION PL TY CA DIN CLASS.
7 0770 4056 HANGER NUMBER 406 WHICH IS PARTIALLY y 0o 5024 R AINSTALLED HAS GROUT MISSING FROM
----UNDER bASE.PLATE. HANGER LOCATED.______________10 ON STEA14 GENERAlOR L(J(JP 2. FULL
HANGER NUMBER IS 1-03A-406.
13
7 F0772 4211 HANGER D33-2AFW-RZ19 ANGLE Of RISER V 0 A 5101 R A14 CLAMP WAS 30 DEGREE 15 NOW 22 DEGREE19 45#
21
22
23
24
25 10773 4212 HANGER 038-lAFW-Rl84 ROD ANGLES V 0 ''A 5025 R A26 4 DEGREES 38' COTTER PINS ARE27 MISSING G~ER CONSTRUCTION ________________
24 SPECIFICATION NO 6-43 2.9.3 ANGLES29 HAVE 2 DEGREE ALLOWABLE
31
32
34
35 0 774 4141 HANGER 03a3-1AFW-R156 COTTER PIN Y 0 A 5165 R A36 MISSING
37
38
40
44
42 F 0_75 4341 HANGER 03B-1AFW-R1l& N C. A 5273 R A43 HANGER IS LOOSE ON PIPE EMBEDMENT
44 PLATE USED45
46
47
46
49
50 F10776 4194 HANGER 038-1AFW-R19l ENV ATTACHMENTS N 0 A 5258 R AATNjLARE 1hOTATEL' 9C DGE ____
52 COTTER PINS MISSING
54
56 PAGE
/34.
29
Vr~i ENGI NEERS-ARCHIILCTS,MISSOURI
PROCESSINS LDAFI EN4ESS EE AUTHDRI TYioATTS BAR W AR PLANT
Agu Ppnj~rT InS3.1f
FINDINGS REPORT SUPPLEMENT
3_________ ORIGINAL,______________________
4 FINDING ORIGINAL STATUS FOLLOW UP FOLLOW UP5 No. DI q DESCRIPTION PL TY CA DIN CLASS.
7 0777 3947 HANGER 036-lArhJ-V199 HANGER HAS NOT Y 0 A- 5026 R A8 BEEN INSTALLED EXCEPT FOR SHEAR LUGS
9 ARE. WELDED TO PIPE _______________
13
14
15 F0778 3817 HANGER 45MI.A427-3-2. HANGER HAS NOT V 0 A ' 5027 R A16 BEEN INSTALLEDW7
19
219
22? f F0 3fi8 HANGER B5M47A427-3-4; HANGER HAS NOT V 0 A 5028 R A23 BEEN INSTALLED
251
F0780 3819 HANGER 85M47A427-3-5; HANGER HAS NOT V 0 ABEEN INSTALLED
(0761 4195 HANGER 03t3-lAfW-Rl4 INSTALLED HANGER V 0 A 5029 R AAGREES WITH THE DRAWING BUT DRAWINGHAS V61D MARKED ON IT. HANGER
________---- ___ DESN*T SHOW ON PIPING ISOMETRIC _________ _______________
859147W427-2 06.
FO~ 17 AGR03B-2ArW-R222 BRACE HAS NOT Y R A 5259BEEN INSIALLI.D
PAGE
3LhCKKAN SAS
5166 R A
541
551
JFCl EN GI Ph ER S-ARCH ITE ITS, 4IIsSOUR I
DIN
4.1,42
A LDESCRIPT
PR3CESSING DATETEN~4ESSLE VV AT~RTWATTS BAR N~EA R PLANT
13gy rROJECT 10520FINDINGS REPORT SUPPLEMENT
ORIGINALSTATUS FOLLOW UP
ion PL TY CA DIN
HANGER 03B-2AFW-R223 ITEM 7 ISWELDED TO E14BEDMENT PLATE-DID NOTUSE CONCRETE FASTENERS. LOCATION OfHANGER 15 1'-8" EAST Of COLUMN NOWAlO
N C :A t5 6
F0784 43,43 HANGER 038-1AFW-R2 WELDED TO N C A 5165 R AEMBEDMENT PLATE-DID NOT USE CONCRETEFASTENERS 20-6m DIMEN4SION IS
F0785 4' 4
S0 78b6 41 9
HANGER 03a-lArW-RCO5 LUGS NOT V 0 A 5030 AINSTALLED ON PIPE I7EM 2 NOT WELDED _______________
ON INSIDE
i HANGER 038-IArW-RE HANGER INSTALLED Y 0 A 5 03 -R A A-AGREES 41TH4 THE DRAWING EXCEPT NOCOTTER PIN INSTALLED DRAWING HASVOID STAMPED ON IT. HANGER DOESN'TSHOW ON PIPINiG ISOMETRIC655MWid.-2O6. ______________________
.07 4,142 HANGER__03B-1AFW-R9 TWOLUGS NOTINSTALLED
Y 0 A 5032
4213, HANGER 030-lAFW-Ril 14AN(,E HAS NO0TBEEN INSTALLED
N C A 5169 R A
PAGE 31
BLACK 6KAN SAS
FINbINGNO-
S0 783
FOLLOol UPCLASS.
NM
44
o 788
54
55
R A
FfCII EN GINEERS-ARCHI TECETS,MISSOURI
PROCESS AM AT E@2 / B84TENNESSEE AUTHORITYWUATTS BAR *EAR PLANT
B&V PRJC 10520FINDINGS REPORT SUPPLEMENT
_________________ ORZ 6fi!NA L
ORIGINALD I DE SCRIPTITON
STATUS FOLLOW UPPL TV CA DIN
FOLLOW UPCLASS.
(0O789 3s2o HANGERW033-lAFW-Rl2; HANGER HAS NOT V 0 A 5033 R ABEEN INSTALLED
F0790 38Z21 HANGER D33-1AFW-RIBi TOP PART OF V 0 A 5034, R AHANGER HAS NOT BEEN INSTALLED-----
HANGER 03B-1AFW-R19 H.ANGER HAS NOTBEEN INSTALLED
V 0 A 5035
?8 FO79Z 3B22 HfANGER 039-1AFW-R20; HANGER HAS NOT V 0A 5036 RA
?9 BEEN INSTALLED
32
34
35 F0793 4321 HANGER 038-1AFW-R25 LOOSE CONCRETE V 0 A 5120 R A36 BEHIND BASE PLATE WITH ANCHOR DOLTS
N C A 5170 RA
DIMENSION IS *-'. 3/6-; 5DIM4ENSION IS 10-10" ITEMWELDED ON INSIDE __
PAGE
BLACK IK A14SA S
F INDoINGNO.
F 0791 4.214
39
l0
61
62
r ýnl. /.,Tir HANGER 03a-IAFW-RZ6 99-Z 3/8" N C A 5170 R A
PROCESSING
3LACK OWCH E14GINEERS-ARCH17EECTSKANSAS CITY* IMISSOURI
PROCESSING DATETENNESSEE VWAUTHORITYWAITS BAR N ER PLANT
iILU PROJECT 10520
FINDINGS REPORT SUPPLEMENT
FINDII46 ORIGINALNO. E)I N
F080D 4DE5
DESCRIPTION-- - - - - - - - - - - - - ----------
REFERENCE TABLE 3.9-25 FSAR
kA6MEPLATES O1N REACTOR NOV &D 1A2-A
-fOR VALVES FV-16:
1-ICV-3-116B; I-FCV-3-136A AND
1-FCV-3-1368 AND NAMEPLATES ON
REACTOR wMDV nQ 107- FO AV
ORIGINALSTATUS FOLLOW UP
PL TV CA DIN
Y R 1B
1 -FCV-3-1 26A1 I-FC V-3-1 26B;I-FCV-3-179A AND 1-FCV-3-179B
GIVEN IN TABLE 3-9-25 Of THE FSAR.[ALSO SEE F0120J
f0o1o 4 76 7 TIME DELAY RELAYS iSG; 2SG; 350___________AND t.SG DO NOT HAVE THEIR TIME
N 0 A 5102
SETTINGS SHOWN ON THE SCHEMATICS.FIELD INSPECTION Or RELAYSDETERMINED THAT NO SETTINGS HAVEBEEN MADE REV WIRING DIAGRAMS45N600-3-3 REV. 2 AND 4.5N600-3-4REV. 2 [SEE F0126J
4275 COMMON CONNECTION FOR RED AND
42 15
GREEN INDICATING LIGHT NOTIDENTIFIED ON REFERENCE 4581769-2AR5. FIELD WIRING NOT IN ACCORDANCEWITH WIiRING DIAGRAM. FIELD WIRINGHAS COMMON CONNECTICN TAGGED ''
AUkILIARY RELAYS SHOWN ON WIRINGDIAGRAMS &HE NOTSH(AWN ONSCHE.MATIC 45w.760-3-4 k6 AND45W760-3-3 Rt. THESE RELAYS AREACTUALLYV INSTALLED AND EXIST WITHNiTHE MEE CUBICLE. SERVlhO THE VALVES.ACTUAL FIELD WJIRING DOES NOT AGREEWITHTHE SCHEMATIC DIAGRAM.
V A a 5037
FOLLOW UPCLA SS
R A
FEDU02_ R B
45
46
49
Oso51
52
C)5354
55.
sr,57
u~ 0 A 5103 R A
PAGE
Y R B 5037
5232
PRDCESSIN& DATE
KANSAS CITY, 'iISSOURl WAuTTS BAR NoIc-LLIII AN
/ 8E~~~~~~~~~BV PROJECT 10520 __________________
FINDINGS REPORTSUPPLEMENT
4 FINDING ORIG14IAL STATUS FOLLOW UP FOLLOW UP
9 NO. DIN DESCRIPTION PL TV CA DIN C LASS .
F0804 42 61 COMMON CONNECTION FOR RED VRB -53
AND GREEN INDICATING LIGHTS FOR
MOV I-FCY-3-116A STARTER IS_________________10 IDENTIFIED AS (.21 ON WIRING
It DIAGRAM 45VI767-20 R6. THIS WIRE12 IS ACTUALLY CONNECTED To POINT [I]I13
14
15
ý'j F0005 4346 REFERENCE DWG 45W760-3-1 R4 TRANSFER Y R a 5039 R B
POWER SOURCE TO EMERGENCY POWERSOURCE 'IS SHOWN CONNECTED SO THATTHE NEGATIVE POLARITY IS REVERSEDFROM ACTUAL WIRING. ACTUAL WIRINGDOES NOT AGREE WITH THE WIRING SHOWN
ON OWG& A5i76O-3-1 R4..
F0606 42611 DRAWING 45WI769-5 R3;1-Vs-w29Z-B'6-8* CONNECTION AT1-H54- 179A/D ON WIRING DIAGRAMIS TAGGED 3AG. TAG SHOULD BE 3AQWHICH WOULD AGREE WITH ACTUALFIELD WIRING.
JFO807 421t LAbLL~ NUI ID~LI.LU MAIn L4.LVA~AUI*
COLOR CDDE. REF WIRING DIAGRAMS4561769-3A R7 [1V296383 AND REFWIRING DIAGRAMS 45BI769-2A R5(1A3913 AND IVZ94413J
- 0 A ~2Afl
I II P.- - - ~ a a
44I -
PAGE
. a r 17 A n6 CABLES NOT TACGLD WIuH uxvAaAun
TLN4ESSEl. AUTHORITY3LACK OWCH ENGINEERS-ARCHITECIS
3 .LACK W TCH E14GINEERS-A RCHITE CTS-KANSAS CITY, 'iISSOURI
PRDCESSIN~i DATTENNESSEE AUTNOR ITYWiAITS UAR W EAR PLA14T
LiKV PRnJip2T lnS'O
FINDINGS REPORT SUPPLEMENT
ORIGINAL.
FINDING DRIG1'dAL
NO- DIN
STATUSPL TY CADES CRIPTI ON
FOLLOW UP FOLLOW UPDIN CLASS.
7 F 0 O01 3923 INSTALLATION Of THE TURBINE-DRIVCN V 0 R 52 A8 AFW PUMP IS NOT YET COMPLETE.9 NS5ALATýION OF ASSOCIATED18 INSTRUMENTATION AND CONTROL IS
II COMPLETE BUT NOT YET CALIBRATED1.2 NOR TESTED.
14
16
8E FOlE9 42 17 FSAR SUBSECTION 6.3.1.4.5; ITEM T R B 5261 A a3I~q B-16 OF THE ELECTRICAL CHECKLIST;
2C IDENTIFIES CABLE MARKING21 ____ EQU IRE MENTS . ASSOCIATED WITH THE A ________________
22 TRAI1N Of THE AUX fEEDW~ATER SYSTEM23 IS A HYDRAULIC ACTUATOR; EQUIPMENT24 IDENTI FICATION NUMBER 1-PCV-3-122A.25 INSIDE'THE ACTUATOR CABINET TWO26 EXTERNAL CIRCUITS WERE OBSERVED.
21 __________________________________
28
30
10610 39Z4 LOCAL PANEL I-L-361: THE BACK COVER v 0 A 5262- -KLDTHE D-EjýIES FM-3-tI2 WAS ____________
NOT INSTALLED AND LEFT INSIDE THEPANEL. ALSO; SOME TAGS ARE NOT TIED
___ ___TO THEIR ASSOCIATED DEVICES ANDLEFT INSIDE THE PANEL INA PLASTIC BAG.
R A
Fuf~11 '4Z1~ E UXILIARY CON4TROL ROOM PANEL Y 0 A 5263 R A1-E-11A: TRANSFERS61ITCH XS-3-164 ______
HAS MISSING TAG. ALS&i LM-3-172AND LM-3-175 ARE NOT INSTALLED IN
_____ ~~~THIS PANEL. __________________
PAGE
:I_
.H ENGINEERS-ARCH! TECT S.41 SS OUR I
PROCESSING DATETEN~NESSEE VW AUTHDRITV6ATTS bAR A R PLANT
L&V FROJECT 10520
FINDINGS REPORT SUPPLEMENT
FINDING ORlG1l4ALNO. D IN
ro 812 4219
_____________ _________________ ORIGINAL,STATUS FOLLOW UP
DESCRIPTION PL TY CA DIN--------- --------------------
AUXILIARY CONTROL ROOMi PANEL ,
1-L-I1B: TRANSFER S61ITCHES XS-3-132;X~-31f.BAND XS-13-i11i USED
IMPROPER TAGS; THE COLOR IS NOTBROWN (FOR TRAIN b IDENTIFICATION]AND THE TRAIN B SYMBOL IS MISSING-DEVICES LM-3-173 AND LM-3-174 ARENOT INSTALLED IN THIS PANEL* SEEDRAWING 47W600--60*
YTO A 5264
F 0E-15 414.5
F 08 16
65M47W427-ZO5 PIPING ISOMETRIC Y 0 A 52t33
TEMPORARY HANGER STILL INSTALLED
4276 85M1.7h427-205 PIPING ISOMETRICLOOSE HANGER CLAMP Oft PIPE WITH
fob17 4 Z77
44 Fob318 4 '17 8
Y 0 A 5171
65M47W427-205 PIPING ISOMETRIC Y 0 A 5172 R ALOOSE HANGER CLAMP ON PIPE WITHNO ROD AND NUMBER
65MI.7W427-206 PIPINC ISOMETRICLOOSE HANGER CLAMP NWI-TH-NO0ROD AND NUMBER
T o A 5173
FOO19 4197HANGER 035-lAfi~-R24 HITS TRAYSUPPORT___
N4 0 A 5i34
3LA EKKAN SAS
F-UOLL (JWUCLA SS.
R A
RA
PAGE
3LftCK4 C ElNGINEERS-ARCHITEETSKANSA VMI S sOUR I
FINDlNG ORIGINALNO. D 1N
TLN'JESSLEWAITS [JAR
PROCESSING DATErAUTHOR17TTEAR PLANT
I3&V PROJECT 10520FINDINGS REPORT SUPPLEMENT
__________ _________ORIGINALSTATUS FOLLOW UP
bESCR.IPTION PLITY CA DINFOLLOW UP
CLASS.
F08320 4146 85M47W427-206 PIPING ISOMETRIC Y 0. 8 .5174 R BTEMPORARY HANGER STILL INSTALLED AT
____ ~~~THE TOP OF A SLEEVE __________________ ____________________
HANGER 03B-IAFW-R52 SHT 1 & 2REV. 901 FORWiARD SRACKETS FOR BOTHITEM NO. 1S WELDJED ALL AROUND TO A1 114" THICK PL WHICH IS PART OF A
A,, 5175
PROTECTIVE DEVICE WHICH IS BOLTEDTO WAL ,L rPD HAS NO LEGIBLE NUMBER3
_______ ~~ITEMSNO._2;_3;_&4_NOTINSTALLED___ ________________
F 0 i24- 3 9L-3 HANGER__038-1AFW-R061 SHT 1L2 REV 901ITEMS NO. 19Z NOT INSTALLED
V 0 A ,5040
HANGER 03B-IAFW-R66 SHlT 112 GROUTAND ITEMS No. 3; 4; 5; 6; 9 &. NOTINSTALLFD
Y 0 A 5041
f 0 , 1;6
51
52
3 C 2
3625
HANGER 339-lAFW-R67 SHT 1L2; HANGER Y 0 ANOT INSTALLED
F0 8 Z1 _42.79
436LZ
57
5043
H&NGER 033-1AFhI-R68 SHT 112; HANGER Y 0 ANOT INSTALLED
5044, -R-A7
PAGE
f 5 -ý 2-5- -
37
3L~kE C11 NGIINEEkS-kRCHITELTSKANSAS WC~ MISSOURI
PROCESSING DATTEN'dESSEE W AUTHOýIllwATTS CAR ~1EAR PLANT
0. nonl S r 1A !) A
FINDINGS REPORT SUPPLEMENT
3 ____ ________________ ______ ORIGINAL ________________
.4 FIND~ING DR1I1NAL STATUS FOLLOW U P FOLL0ol UP5 D1.1 DESCRIPTIDI4 PL TV CA DIN CLASS.
7 F0826 3BZ6 038-IAFW-RO69 SHI 192 REV 901 V .0 A' 5045 R A8 iTEM NO. 4 [ANCHOR DO0LTS] NOT-
___ TIGHTENEDANDGROUTNOTINSTALLED
12
93
14
15 F0629 408~7 HANGE R 030-lAfW-R71 SHT 1 HANGER NOT V 0 -A 50R A16 INSTALLED
19
fo 38i 7 03B-1AFW-R72 SHT 1&2 REV 1;HANGER NOT INSTALLED
V 0 A 5046
IF0831 4085 HANGER 03B-1AFU-V73 SHT 1&2 HANGER
3 F0,32 3EZS37
HAPJ~FA fl~-1AFhI-R7L SIT 1L~ RPV 1 V 0 A 5047HANGER-NOT INSTALLED
F0633 4063 HANGER 33B-!AFW-R75 SHT 192 REV 1END ATTACHMEN4T NOT INSTALLED INFORWARDBRACKET._FIN IN FORWARDBRACKET MISSING ONE COllE-R PIN
V 0 . A;, ý,ýý4
49
Qso51
52 P0834- 3C)53
54
55
5s
57
' A-NGEfR 3-AIR7 SilT 12REV1HANGER NOT 11.STALLLL
V 0 A 5235
R A
Y--0 A 564 .h .-- 1-
PAGE
NOT INSTAlfirD
PrCH E.NGINkERS-ARCHITUCTS4 ISS0UR(I
TENNESSELE Vý AUTHORITYWATTS 13AR NWMEAR PLANT
EkV PROJECT 10520FINDINGS REPORT
PROCESSING DATE
SUPPLE H EN T
ORIGINALSTATUS
PL TY CADESCRIPTION
HANGER 03B-iAFW-V78 SHT 192 REV 1HANGER NOT IkSTALLED
HANGER 033-1AFW-R79 SHT 1 REV 2HANGER NOT INSTiAILED
T 0 A' 5050 R A
1 0 A 5051
HANGER 03B-IAFW-VBO S147 1 REV IHANGER NOT INSTALLED
1 0 A ' : 5052
HANGER D3a-IAFW-Rbl SHT 1 REV 1 T 0 A 5053 R RAHANGER NOT INSTALLED
HANGER 030-1AfW-RB2 SHT 192 REV 1 T 0 A 5054HANGER NOT INSTALLED
I4AN~FR fl3~-1AFh~-RH3 SlAT L2&3 1 0 A 5055 h AREV 904; HANGER NOT INSTALLED
HANGER 03El-lAfbI-RL. SHT 1 REV 2 Y 0 A 5056HANGER NOT INSTALLED
PAGE
FOLLOW UPDIN
FOLLOW UPCLASS.
R A_
------------
3L&CK 91 A ENGINEERS-ARCHITECTSKANSIAS MI¶~ t4SSOURI
PRDCESSINS )ATEIEN6VESSEE VIN AUTHORITYWATTS BAR N AR PLANT
BLV PROJECT 10520FINDINGS REPORT SUPPLEMENlT
FINDING ORIGIYdALNO. D IN
V.0 843 4145 BF
DESCRIP1I
ORIGINALSTATUS FOLLOW UP
ON PL TV CA DIN
HANGER 033-1AFW-R3 REVISED HANGER T U ~A HR
12
13 F0845 4368 HANGER:03B-IAFW-R91 SHT 192 REV. I N t A 57 R A
14 HANGER SEALED IN A PROTECTIVE1,DEVICE CANNOT CONFIRM INSTALLATION. .......______ _________
'a ELEVATION LOOKING NORTH SHOULD17 READ ELEVATION LOOKING WEST.
16
19
21
22
23 FO C47 40O1 HANGER BOX ANCHOR 85M47A06O ITEMS V 0 A 5265 R A24 4; 5; t AND EXISTING C8X11.5 HAS NOT?5 BEEN INSTALLED
26
27
20
31 10848 3945 HANGER 03B-IAFW-V215 SHT 192 REV. 1. V R A 5236: R A932 HANGER DWG NEEDS TO DE REVISED PER
31 ~ ~ ~ ~ ~ F~ 7988IY . FR~. H-7988 NEEDS TO BE _______________
34 REVISED AS FOLLOWS; THE DIAGONAL35 VERT. BRACE [ITEM NO 6 4"X4"1I/2"J36 IS FILLET WELDED ALL AROUND AT37 EL IS50 7" TO AN EMB THAT IS FLUSH30 WITH THE WALL NOT PORTRUDING FROM39 THE WALL AS INDICATED ON THE FCR. _________________
4 c
42
.F0 850
F 0853
4-3--2 HANGER 85M47A427-3-3 REVISED HANGER V 0 A' 5237
FOLLOW uPCLASS.
4151 ____HANGER O3B-lAFW-R&-36 SHT 1; 2 & 3 N C A 5178REV. 1 HANGER DWG NLE-ES TO BEREVISED PER SK-1029-3
V 0 .1 ". 505 1 R 0%
WCH EKGI NEERS-ARCHiTLLI S, ISSOJRI
PRDCESSING DATEIEN'4ESSEE V ATORTWATTS BAR N EA R PL1kNT
R3EV PROJECT 10520FINDINGS REPORT SUPPLEMENT
FINDING ORIG1MAL
NO. DI1N
FO 6S4 4O01
DE SCR FTITON
HANGER 47A427-7-3 SHT 1 REV 2 HANGERNOT INSTALLED
F0E55 4347 HANGER 03B-IFAhI-VS6 SHT 1&2 HANGERCl IS ILOCATED 8 112- FARTHER SOUTH
N C A 57
THAN DWG INDICATES
FOE56 4152 85M47W427-2OO PIPING ISOMETRIC Y 0 A 5122 R ATEMPORARY HANGER STILL I1NSTALLED
F 0 1357 4ZE E5M47ha427-200 PIPING ISOMETRIC Y R 0 5177 R BSLEEVE NOT REQUIRED
T F) 58 -42L- fl~ML7UL~7~~A(3 PIP INC. 1~AMCTA ir V A A S23B R 1HANGER NUMBERS 036-1AFW-R'iB 9 R49ON THE DRAWING NEED TO BEINTERCHANGED __________ ___ ________________
B35 5M47W427-2O1 PIPING ISOMETRIC N 0 A 523921-3" DI1MENSION IS 5'-9"* AND 10'-D@'DIMENSION IS 61-b" [ALSO SEE FC,747J
3LACY IKA4 SAS
ORIGINALSTATUS
PL TY CAFOLLOW UP
DIN
1 0 A
FOLLW UPCLASS.
KR 1
54
I 0L59
50
51
52
Q5354
35
575PAGE
508 RA 1
3LAC ~@ H ENGINEERS-ARCHITECTS TEN4dSSE NP AUTHOITYPAOESSN& AT
KANSAS CITY, MISSOURI WATTS DAR N EA R PLANT________________ B&V F, EC 10520 -__
I ~FINDINGS REPORT SUPPLEME14T
3______________ ORIGINAL ______
4 FINDING ORIGINAL STATUS FOLLOW UP FOLLOW UP
No. E) . DESCRIPT1ON PL. TV CA. DIN ECLA SS
7 0O60 4198 85M47M427-201 PIPING ISOMETRIC 10 A 5123 R ATEMPORARY HANGER SUPPORTING OTHERPIPE STILL INSTALLE
12
13
' F 0662 1_4199 85pq47W427-201 PIPING ISOMETRIC T A~ 5180 R A
'4TEMPORARY HANGER STILL INSTALLED ATis THE EDGE Of A SLEEVE
19
20
22
23 FI0&63 4065 85M1.7W427-201 PIPING ISOMETRIC PIPE V 0 A 5124 R A24 RESIING ON W6X6 112" DEEP STEEL25 HANGER FOR DUCTWORK [TYPICAL BOTH20 PIPES]
28
29
30
31
32 F0664 4154 85M47W427-201 PIPING ISOMETRIC V 0 A 5181 R A
33____ 3 BOLTS MISSING FROM FLANGE______34
35
36
38
39 .10165 4330 -85M47W427-201 PIPING ISOMETRIC V R B 5240 R B_____ ________
40 HANGER 03B-IAW-R207 ON THE DRAWING41 SHOULD BE CHANGED TO READ42 0301IAFW-V&07 __________________
44
44
404
474
48 F0E66 4221 85m47w427-2O1 PIPING ISOMETRIC V R B 5241 R _ ___B
40 HANGER 47A060-3-6 ON, THE DRA$WINGSHOULD BE CHANGED TO READ 47AQ60-3-3
52
53
56 PAGE
PFEH ENGINEERS-ARCHITECTSM41SSOURI WAl
lESSIEE VAU AUTORITYTS BAR NMDorAR PLANTF3LU PROJECT 10520
PROCESSINGS DATE
FINDINGS REPORT SUPPLEMENT
FINDING ORIGINALNo. DIN
F01367 3837
D E SCR IPT ION
65MO7W427-2O1 PIPING ISOMETRICPIPING HAS NOT BEEN INSULATED REF TO-NO TE 4 __
_ORIGINALSTATUS FOLLOW UP
PL TV CA DIN
V 0 A 5125
FOL68 4222 HANGER 1-03a-1 SW! 1L2 REV. 901 N -0 A 5126 _R A _______ ________
HANGER Mar INISTALLED
F0C9 492 85M(.7WI27-200OPIP1ING ISOMETRIC V 0 A 5127 A-PIPING HAS NOT BEEN INSULATED REFTO NOTE 4
:01 FOL70 39493'
UAAJr~a 1-fl~fl-~ ~uT I 7 I~ ~ AFV... Qi~ V
HANGER NOT INSTALLED
3 3 i~___
34
HANGER 1-038-5 SHT 1 REV. 903HANGER NOT INSTALLED
V 0 A '5060
FOEC73 3951 HANGER 1-038-35 SHlT 1 REV. 902HANGERNOT i.NSTALLED ------ __
V 0 A 5061
UlsI; 0174 40931 HANGER__1-03A-445 SlIT 1 REV 903
- IS? HANGERs NOT INSTALLED
5I4I _________________ _________
57L
V _0 A ___5062
PAGE
9LACKKANSAS
FOLLOWi UPCLASS.
fl A 5050
R A
R A
f.0 1; 71 3950
BLACK &I H E14GINEERS-ARLHITECTSKANSAS CI~v MISSOURI
PROCESSING DATETEN4ESSEE Vq AUTHDRITYh6AITS EjAR 4 A R PLANT
.ViU DanE4BfT IA 2f
FINDINGS REPORT SUPPLEMENT
4 FINDI.NG DRIGIYAL STATUS FOLLOW UP FOLLOW UP5 NO. D I N DESCRIPTION PL TV CA DIN C LASS .6 - ------- - - - -
7 FOE75 4349 HANGER 1-03A-4.47 SHT 1; 2 &. 3 V 0' -A '5242 RA 08 REV. 903 HANGER NO0T INSTALLED
10
12
13
14 F0876 4094 HANGER 1-03A-452 SHT 1&2 REV 902 1 0 A 50163 R A______ HANGER NOT INSTALLED
46
17
18
19 ' 7
20
21 FO&7? 42&3 HANGER 1-0'3A-4.56 SHT 1; 2; 3 &. V 0. A SIZ8 R A22 REV. 903 59-1" DIM4ENSION Itd THE23 "LOCATION PLAN" VIEW OF HANGER DWG
24 SHOULD 8 E 6'-6 11i"25
26 1
27
28
29
32 FOEIM 4066 H ANG6ER 1-038-11 SHYT 1 REV 903 V R A 5266 R A311 REVISE' HANGER DWG PER SKETCH 1103-4
[SEE MARKUP] 9 DELETE ITEms 4 L 5
F 0 b83 4264 HANGER 1-038-39 SHT 1 & 2 REV. 902RElVSE HANGER DwUG PER SKETCH 1103-6
V OA 5064. R A
4 11E,5 HANGER 1-03A-4.46 SHT 1. 2; 3 9REV. 904 REVISE HANGER DWG PERSKETCH 1103-7
N 0 A, 5274
*F01367 40(55 E15M47w427-202 PIPlNG ISOMETRIC V 0 A 5267______________PIPE HAS NOT BELN INSULATED ____ ___________
FOEE4
R A
PAGE
PFCH EINGINEERS-ARCHI TECTSMiISSOURI
PROCESSING DATETEN 4JESSEE Vý AU THOR ITYb.ATTS EAR NVE~EAR PLANT
JV&V PROJECT 10520~FINDINGS REPORT SUPPLEMENT
FINDING ORIGINNo. Di1N
rO0L f 4155
FOL90 41160
F 01392 4 T6 1
DESCRIPTION
ORIGINALSTATUS FOLLOW UP
PL TV CA DINFOLLOWJ UPC LA 5S5
85N47W427-202 PIPING ISOMETRIC V 0 A 5182 R A
TEMPORARY HANGER STILL INSTALLED
EJ5r47W427-202 PIPING ISOMLTRIC V 0 A 5129 R A
-..JEAPDORARYMANGER-A{Qj- [AXTE)JD TO-10______ _____
THE PIPE WITH 1/2" CLEARANCE
85M47W427-202 PIPING ISOMETRICLOOSE NUTS AND BOLTS AT FLANGE
V 0 A 5243 RA 0
F01393 435C HANGER 1-03A-459 SHI 192REV. 902 REVISE HANGER PER SKETCH
J0894 3952
;6fL9 4369
1103-9 :! "; -.-
V 0 A 51F3 RPA
VALVE 47W4.27-22 ON DRAWING SA-2097- V R A 52?75IC DESIGN PRESSURE/TEMP SHOULD BE
CI$C -LL0VERIFY -CORRECT PRESSURE/ ________
TEMP AS ON DRAWING 47WE03-2
85Nf.7,427-206 PIPING ISOMETRIC tN C A 5184HANGER 03bs-lAFw-Rl6 HAS BEENINSTALLED -DOESN'T_1 SHW _ON DRAWING _______
AND NO HANGER DF(AWIIG HAS BEENPROVIDED FOR THE REVIEW
PAGE 45
BLACK IKAN SAS
A L
3LACK &W H ENCINEERS-ARCHITECTSKANSAS WC.IY MISSOURI
TEN NWAY
PROCESSING DATEESSEE V AU THOkITYIS BAR NOWEAR PLANT
FINDINGS REPORT SUPPLEMENT
3 ______________ _________ ________ ORIGINAL ________________
4 FINDING ORIGINAL STATUS FOLLOW UP FOLLOW UP5 NO. GiN 14 SCRIPTIiOt PL TV CA DIN C LASS .
7 10902 4095 85M47W-I.27-206 PIPING ISOMETRIC V 0 A 5130 k A
* No DOLTS IN TURBINE DRIVEN AUXILIARY9 _______ ~FEEDWATER PUMP SUCTION FLANGE_________________
10
10903 4162 ~ML7dL~7..~flL D1D1IJ~ 1CflM~TU1~
TEMPORARY HANGER STILL INSTALLED
0904 d-Li7 85M47W427-2O6 PIPING ISOMETRIC V 16R AHANGER CLAMP ON PIPE WITH NO RODAND NUMBER
IANt~FA 03R-lA1hd-ROS1 SlIT 1: 2:3 V 0 A 50659 1s REV. 903 HANGER NOT INSTALLED
65M47w427-200 PIPING ISOMETRICHANGER 4iA427-4-IA HAS NOT BEENINSTALLED AND NO DRAWING WASPROVIDED FOR THE REVIEW
V A 5066 PAA
65M47Wi.27-200 PIPING ISOMETRICHANGER 47A1.27-4-2A HAS NOT BEENINSTALLED AND NO DRAW114C. WASPROVIDED FOR THE REVIEW
V fl a 1R'~
F 0905 ~.1 (;~
I10906 4Zf)E~
- f0109067 42'2 4
54
59
V O A 5 06 7 RA
PAGE
3LACK &. H ENGINEERS-ARCHITECTSKANSAS Ew1"' MISSOURI
PROCESSING DATETENNIESSEE VNAAUIHORITY6ATTS OAR N AJ'R PLANT
flSA p~ljFrT 16%2n
FINDING ORIGINALNO. DIN
F090B 4095
FILDINGS REPORT SUPPLEMENT OIIA
STATUS FOLLOWJ UPD~ESCRIPTION PL TV CA DIN
85MI.7W427-207 PIPING~ ISOMETRIC,PIPING HAS NOT BEEN INSULATED SEE
-NOTE 2 ON DRAWING
Y 0 A 5131
F 0909 4164 B5mV.7w427-207_PIPING ISOMETRIC Y 0 A 517R A _________________
TEMPORARY HANGER STILL INSTALLED
r F090 48 85N47w427-207 PIPING ISOMETRIC Y R 9 5188 A 1BSLEEVE NOT REQUIRED TYPICAL 2 PLACES
2291 F 1U0y11 4 15 128
34
37
E5M47W427-206 PIPING ISOMETRIC N C A 5189
______BO ~A NCIIHOR ED MILD no5 NOLU' Gunl "m
TAG ON THlE ISOMETRIC DRAWING BOXANCHOR HASN'T BEEN IN~STALLED ADRAWNG Of THE BOX ANCHOR HASN'TBEEN PROVIDED FOR THE REVIEW
_17 091l5 409~7 HANGER 1-03B-53 S11T 1; 2; 9 3 REV905 HANGER NOT INSTALLED
T 0A 5066
FOSIE 4095 HANGER 1-D30-55 SHT 1 REV 901HANGER NOT IN~STALLED
FOLLOW UPCLASS.
Y 0A 5069
PAGEZ
'H ENCT NET RS-ARCHI TLCTS14ISSOURI
PROCESSINS DATETLNNESSEE V ATOR1WATTS BA N R PLANT
.fBLV PRnj~(T 10%20l
FINDINGS REPORT SUPPLEMENT
F1INDING ORIGINALNO. D IN
___________ ___________ORIGINAL
STATUS FOLLOW UP FOLLOW UPDESCRIPTION PL TV CA DIN CLASS.
F0919 4323 HANGER 1-03D-57 SHlT I REV 901' V 0 'A 5244. A ADELETE ITEM NO. 2 K ADD A 1 112"X
____ ~ ---- 1 12 LGI[3/4'AiifLiELO ITEM NO& I_____________
uI9S~0~ 4~Z5 i~R1~~4 S~lT 1REV. 903 1 0:`A5,'L _____________
DELETE ITEM NO. 2 9 REVISE WELDS ONITEM NO.1
4J.
F0922 4291 HANGER 1-03B-73 SHlT 1 & 2 V 0 A 5070 R AREV, 903 CHAN4GE QUANTITY Of ITEMNO. 1 FROM I TO 2 L REVISE PIPE.
9 O2 3 4292
4099
TO HANGER CLEARANCES
HANGER 1-038-78 SHT 1 &2 1 0 A ~i5071 R A%got9.D CHiANGE-ITMS No. li 4 9 6 ______________
FROM 4"X4" TUBE STEEL To 20'X2'TUBE STEEL[AkLSO SEE F03741
HANGER 1-33A-4DI SHT 1 REV 902 V 0 A 5072 R AHANGER END ATTACHMEhT IS NOT WELDEDTO END. WALL PL 9 HAS ONE COTTER
PNMISSING___________________
F~2 i~ HANGER 1-03A-4.13 SHT I RE V 90 1HANGER NOT INSTALLED
1 0 A 5073
3LD.(K IKANSAS
55
5'
55
PAGE
-.H ENG61 EERS-&RCHITLCTSMISSOURI
IENNdESSEE V4WAITS BAR h
ia~u PLflIFCI 1A'~fl
PR)CESSING DATEPAUTHOR17ivFiR PLANT
F114DINGS REPORT SUPPILEMlENT
FINDING ORIGINAL
NO. DIN DE SC RIPTION
_______ ORIGINAL
STATUS FOLLOW UPPL TV CA DIN
7 0O926 41CI HANGER 1-03A-414 SHT U&2 REV 901 y 0 A; 5074 R AHANGER NOT INSTALLED
12
13
14 r0932 4226 &5M47W4127-204 PIPING ISOMETRIC Y R 8 13 R 8HAGR038-lAFW-RZ16 IS INCORRECTLY________
16 CALLED OUT ON DRA61NG AS R21717
19
21
22 F0934 4102 65M47W427-204 PIPING ISOMETRIC y 0 A 5133 R A23 PIPING HASN*T BEEN INSULATED
24 SEE NOTE 3 ON DRAWING211
22l F0935 4103311
~M67hl&27-'fl~ PIP!N~ ISOMETRIC V 0 A 5134
PIPING HASN'T BEEN INSTALLED FROMNODE 106 TO 110
F0937 4293 6SM47w427-2O4 PIPING ISOMETRICHANGER 33B-IAFW-R94 HASN'TBEENINSTALLED AND NO DRAWING WASPROVIDED rOk THE REV1LW ,
V 0 A 5268
FD3E 4172 65ti479427-204 PIPING ISOMETRIC
_____ _____TEMPORARY HANGER STILL IN4STALLEDLTLOOSE3
V D A 5190
PAGE 49
BLAC~K 0KANSAS C
FOLLOW UP
C LASS.S
R A
R A
9-vu PftnIECI 10r:;O
P~t4 E NGINEERS-AR CHI TEETS TENNESSEE VlWiATTS BiAR
FAUTH DR ITAR PLANT
PR3CESSl%5 DATE
ý'6 BEV PROJECT 10520FINDINGS REPORT SUPPLE ME NT
3 ______________ ~~~~OR IjINAL ____ _________
4 FINDING ORIGINAL STATUS FOLLOW UP FOLLOW UP5 4 6 D 14 DESCRIPTION PL TV Ck DIN CLASS.
7 10O939 4294 65k4.74427-204 PIPING ISOMETRIC, V t 216 R BB HANGER 038-1AFW-V2l5 ON THE DRAWING
9 IS INCORRECTLY MARKED AS Rt 215
:10
131
F09 0-41 DA61
i..lLfl it i5 __ _ _ _ __ _ _ _ __ __a__ _ _
40 TEMPORARY PIPE STILL BOLTED TOTHE TOP Of CHECK VALVE AT NODE 4E8
S0 942 4227 65M47W427-2O4 PIPING ISOMETRICu*~~fA - nir..u7 nWa TU~ hoAu11.Ii
IS iNChRRECTLT CALLED OUT AS V51
6SM&7WI27-204 PIPING ISOMETRIC]TEMPORARY HANGER SUPPORTING ANOTHERPIPE- FROM A DIFFERENT SYSTEM ýý
V 0o A 5136 R A
10947 4295.__ 85M47W1.27-204 PIPING ISOMETRICHANGER LOCATED AT NODE 78 HASN'TBEEN CALLED OUT ON THE DRAWING;NO fiRAWlNa WAS PROVIDED FOR THEREVIEW;' AND NO HANGER WAS INSTALLED
1 0948 4105 85rI47W427-204 PIPING ISOMETRIC1" PIPING AT NODE 52 HASN'T BEEN
.__ ....... NSTALLED
Y 0 A 5137
3LP5(K /8
v as. a~. ~ DL
½2~
F0943
Y R 8
41 74
5247 R B
-V.
TO A 5248
PAGE
DOOMED v U-1 Em a
---------- -
----------
H ENGIN EIRS-ARCHITECTS141 SS OUR I
PROCESSING DATETENNESSEE V FAUTHOFZ1TYWATTS BAR 4 R PLANT
Rkil FROjI7CT 10520
FINDINGS REPORT SUPPLEMENT
FINDINIG ORIGINALN U D 1N
TO0949 43 52
DESCRIPTION
85M47W1.Z7-2O4 PIPING ISOMETRICHANGER LOCATED AT NODE 9 HASN'T BEEN
-E CAL.LL-E I[ON.-THE-D DA-WIN6; 1DODRAWING WAS PROVIDED FOR THE REVIEWAND NO HANGER WAS INSTALLED
ORIGINALSTATUS FOLLOW UP
PL TV CA DIN
N C A 5191 R A
F0950 43,53 B5M47W427-204 PIPING ISOMETRIC N C A 5192 R AHANGER LOCATED AT NCLE 16 HASN'TBEEN CALLED OUT ON THE DRAWING; NO
21 L0.95 1- 3 5 4
DRAWING WAS PROVIDED FOR THE REVIEWAND NO HANGER WASLN.STALLED
15 k7-klZQK-0 -PIF PG I -- --15 -- E-T-IC___HANGER LOCATED AT NO00C 20 HASN'TBEEN CALLED OUT ON THE DRAWING; NO
.%na~n Lit f~fhI~~r~tntT C CCTKU
AND IF HANGER WAS INiSTALLED, ITWOULD BE CONCEALED INSIDE SLEEVE
N C' A' ýe 519 3 RA
F095Z 41 7E 85M1.7W127-204 PIPING ISOMETRICIMEDRARI. HNE R- _ 4X.4 1'k-W/U-,B 0LT
SETTING ON TOP OF A SLEEVE
Y 0 aB 5191.
FU554 4Ico E.5M47w4917-2O4 PIPIIJG ISOMETRIC Y 0 A 5195TEMPORARY HA14GER 3"L W/U-SOLT WELDED
_______ jD~~ EBLDMENT P-LATE _______ ___________
3LACI( K
KANSAS C
FOLLOW. UPCLASS.
RB8
R A
PA 6E
tCH ENGINE ERS-ARCHITLCTS, MISSOURI
TINNESSEE AUTHORITYWATTS ElARq EAR PLANT
B&u ORDJECT ¶flrrj
PROCESSING DAJ
FINDINGS REPORT SUPPLEMENT
FINDING ORIGINALNO. D IN DESCRIPTI ON
ORIGINALSTATUS FOLLOW UP FOLLOW UP
PL TY CA DIN CLASS.
F0955 4355 E5MO4W427-2O& PIPING ISOMETRIC N C A 516R AHANGER LOCATED At NODE 32A HAtN-T
_______ ~ ~ E~u CCLLED ()ULILSIHE DRAWING; NO ________________
DRAWING WAS PROVIDED FOR THE REVIEWAND NO HANGER WAS INSTALLED
F0956 Albi 65M47hI427-2O4 PIPING ISOMETRICTEMPORARY HANGER STILL INSTALLEDAt NODE -33
?4
?5 F0957 4182 85MU?427',-ZOA PIPING ISOMETRIC v 0 A 5S198 R ATEMPORARY HANGER STILL INSTALLEDAT NODE 34 _________________
?8
30
32 '
33 9 54_ 43 56 f5U 7-2OPj ING ISOMETRIC NC A -~5199 R A34 HANGER LOCATED AT NODE 34 HASN'T
30 BEEN CALLED OUT ON THE DRAWING; NO36, DRAWING WAS PROVIDED Fog THE REVIEW37 AND NO HANGER WAS INSTALLED
38
39
42
43 F0959 41b3 B5M47W427-2O4 PIPING ISOMETRIC T 0 ýA 5200 R ATEMPORARY HAN~GER STILL INSTALLEDBETWEEN NODE 35 & 36
41E.4- 5M742- PIPING ISOMETRICTEMPORARY HANGER STILL INSTALLEDAT NODE 35A
Y 0 A 5201
BLACKKAN SAS
Y 0 A 5197
F 09,60
PAGE
0
0
3LRCK A CH ENGINEERS-ARCHITECTS TEN4dESSLE II AUTHORITY PROCESSINS DATEKANSASm sfY MSSOUR I W.A17S UAR N A R PLANT
6 (3REV PRJC 10520F114DI NGS REPORT SUPPLEMENT
3 ORIGINAL._________ ____
4 F INWýiNG6- OR I _-N AL STATUS FOLLOW UP FOLLOW UP5 NO. D 1 . DESCRIPTION PL TY CA DIN CLASS .
7 F0961 4225 65M4?W427-204 PIPING ISOMETRIC N 0A 520 R A8 PIPING HAS BEEN REVISED BETWEEN9 N~AODE xx 9 87E
12
13 .
15 0962 4 1 ý6 65I.144TW27-2 4 PIPING ISOMETRIC Y 53 RA16 BREAK DOWN FLANGES ONLY HAS ONE'7 BOLT THAT HAS BEEN INSTALLED18
20
21
22
23 F 0963 437D 95M',7W127-207 PIPING ISOMETRIC N C A 5203 R A24 HANGER 47AI.27-3-7 RELOCATED OFF
25 ?ORE THAN THE 6" ALLOWABLE.CPER SPEC ' 52
26 - Z.B.A 33 AT309 DEGREE 46' 0___________________
27
32 F0964 4371 G5M47W427-20O7 PIPING ISOMETRIC N C A .'~5204 R A33_ A N NG E It038-IAEfd-&15 REJ~OCATED OFF_____________________
38 MORE THAN THE 6" ALLOWADLE EPER SPEC135 G-43 2.8.1.33 AT 310 DEGREE 00.
3f
38.
39
40
41 F0965 4372 85M47W427-207 PIPING ISOMETRIC N C A 5205 R A42 HANGER 03a-lAFW-R1CZ RELOCATED OFF
43 MORE THAT THE 6" ALLOWAbLE [PER SPEC1 44 G-43 2.8.1.33 AT 332 DEGREE 43'
46
47
48
r o F0968 4297 HANGER 1-33A-402 SlIT 1 &. 2 Y 0 A% 5075 R A51 E 902 REVS I1 NO. 5 FROM A -______ ---- __-
52 10 112"SrQK71b" INK P1 TO A153 12"117"X7/8" THK P'L
55PAGE
70
to
.4
15
17612
11
23
202C222124
3237
343536
3943341
42
414442
4144
5c51
57
5174
5f
57
57
53
CH~ ENGI NEERS-ARCI4ITLCFSMIISS OUR I
TENNESSEEWATTS BAR
FAUTHORI1TYAR PLANT
PROCESSING DATE
"~W PROJECT 10520-FINDINGS REPORT SUPPLEMENT
FINDING OR1614ALNO. DIJN DESCRIPTION
A L, , ALSTATUS FOLLOW UP
PL TV CA DIN
10969 4357 HANGER 1-03A-403 SHT 1; 2; 3 &-4REV. 904 CHANGE ITEM NO. 1 FROM 6"SQ TUBE STEEL TO 10" SO IlinFl sTrFLL DELETE ITEMS NO. 2; 7 &-8F
Y 0.'A 5076
FO0970 4 10 7 HANGER 1-D3A-406 SHT 1; 2; 9 3 V 0 A 5077 R AREV 902. NO IDENTIFICATION TAG ONHANGER: HANGER PARTIALLY INSTALLEDITEMS 1,3; 4; 5 & 6 NOT INSTALLED
F0973 4324 65M47W4?.7-219 REV 0 PIPING 'ISOMETRIC PIPE GUIDE NK-I'-03;-RV-H66
T .0 ~A 50
ISOMETRIC DWG [NO DRAWING OF PIPEGUIDE PROVIDED FOR REVIEW]
FO0974 4108 65M47w427-219 REV 0 PIPING ISOMETRIC V 0 A 5139 R APIPING IS NOT INSULATED PER NOTE 2
12 FQ975 4373l 65M47hl427-219 REV A PIPING ISOlMETRIC N
HANGER i-03A-404 IS NOT INSTALLED[NO DRAWING PROVID.ED FOR REVIEW]
FO0976 41ZB &5M447u427-216 PIPING ISOMETRIC AZ
MARKED O1N THff DRAWING As 335DEGREE-529
V 0 B 5249
PAGE 54
3LACKKAN SAS
FOLLOW JPCLASS.
r £ ~~fl7 IDA
F3 U
r MOT SHOWN ON PIPIN
C A r 2 n 7
ICH ENGINEERS-ARCHITECTIS,MISSOURI
PROCESSING DAYTEN.4ESSEE IW AUTHORIT7yWATTS BAR WAR PLANT
D&V PROJECT 105Zj __FINDINGS REPORT SUPPLEMENT
DESCRIPTION
ORIGINALSTATUS FOLLOW UP
PL TY CA DINFOLLOW UP
CLASS.OR IGI NALDINi
FO097C 4298 8SM&W4W -218 PIPING ISOMETRIC y A 5208 R ALOOSE HANGER CLAMP WITH NO ROD-AND
________ NO ~NUMBER ____________________________
F0979 4325 65M&7hd1.7-2jA8 PIPING ISOMETRICPIPE GU IDE 1-03-RV-422 LOCATED ATAZ 196 DEGREE-070 HASN'T BEEN
LRLILID~~~ Iu rn Iflflrfl * L
DRAWING WAS PROVIDED FOR THE REVIEW
f 0980 4.326 85M4,7hU27-218 PIPING ISOMETRIC T 0 A 5209 R A
21 ______________
28
PIPE GUIDE 03-RV-423-LOCATED ATA7 210 1 .OGREEF4!O. HASNGT BEEN,CALLED OUT ON THE DRAWING AND NODRAWING WAS PROVIDED FOR THE REVIEW
FO~b1 4109 65M1.7W1.27-21f8 PIPING ISOMETRIC.................... nrrr _J,, fcr
F0 983 4 Z'9
V 0 A 514.0 R A
rzrjnu n..m~-u QLLI* ~
NOTE-2 ON THE DRAWING
9 47wi&27-I REV. 17 DETAIL C HAS A V I A 514.1 R ACOUPLING CALLED OUT AS A 1'X12m'REDUCING COUPLING IT SHOULD READ1 'X I12" RE-DU-CING -COU-P-LING
PAGE
3LACKKAN SAS
VlNVINNGNO.
v 0 'A 52 50 R A - -- - -
52
54
571
CH EN GINE ERS-ARCHITE Crs.v . MISSOURI
TEN~NESSEE JW AUTHORI TYWATTS 13AR _WAR PLANT
PROCESSIN5 DA1JEV /54
FINDINGS REPORT SUPPLEMENT
_____________________________ ORIGINALSTATUS FOLLOW UP
DESCRIPTION PL TY CA DIN------------------------------------------------------ -------
V R B 5141.F0984 43i7 47W427-5 REV. 6 HANGER IE-0036 IS
Not INSTALLED,, NO HANGER DRAWING
P1 Ii JQIRE VWANVDOElA4ANL.SHOW ON ISOMETRIC DRAWING47w427-219 REVS 0
4 7
7 F09F5 4300 47W4.27-5 REV. 6 HANGER 1E-0004 IS T R A 5143 R A
8 . NOT INSTALLED NO HANGER DRAWINGPROVIDED FOR REVIEW AND DOES NOT, .
S OW ON ISObMETRIC DRAWING_____ 67W127-ý218 REV.O
?2
24
75
26
27 rQ986 4374 - 47W1Z7ý-5 REV. 6 HANGER IE-0446 IS I C. A ~5~11O R A
28 NOT INSTALLED; NO HANGER DRAWING29 PROVIDED FOR REVIEW AND DOES NOT
30C__ SHOW ON ISOMETRIC bRAWING 47w427-2lks31 REV. 0.32
3
34
3E
7 F0987 4301 47W427-5 REV. 6 HANGER IE-0038 IS v A 5144 R B30 NOT SHOWN WHERE IT IS INSTALLED
40
42
431
F09kBB 4302 4ZW427-5 REV. 6 HANGLR IE-0039 IS V R B 5145
NOT SHOWN WHERE IT 1S INSTALLED ____________
3LACKKAN SAS
FINDINGN.
0 RlI G 14 A1FOLLOWd UP
ECLASS.'3
'576 1 -'7
16
17
21
2f
2223
252627
286
215
3233
37
45) "
40
41
4253
4.1)45
48
19n .f '
ýH ENGINEERS-ARCHITECTSmi sS OURi
TLdEN SS175L EkATTS BAR
AUTH ORITYVAR PLANT
PRDCESSING DATE
69gV PROJECT 10520FINDINGS REPORT SUPPLEMENT
FINDING ORIGINALNO. DI N DESCRIPTION
*F0989 4358 47W427-5 REV* 6 HANGER IE-0002 IS V 0-; A 5-269 R ANOT INtATLLED; NO HANGER DRAWING
______ PiLOVJILDAF4R EVIEi6&N --- VOES NOT ____________
SHOW ON ISOMETRIC DRAWING 47WI,27-El8REV. 0
'51
17 F0992 4303 47W4.27-5 REV. 6 HANGER 1E-04.51 ISonAT 1#JC.&TI i fIL un I4AIJ(ru nAauiNI
V R B 5146
PROVIDED FOR REVIEW AND DOES NO .TSHOW:ON ISOMETRIC DRAWINGtL7uL;)7w.1R QFV 0
___L993__ 4230 47W427-6 REV. 6 THE ELEVATION F OR a ~55 R 8HANGER IE-0443 IS EL 743*-4" NOT7369-0" AS SHOWN.
60901 411) ITEMS 6-12 Of ELECTRICAL CHECKLIST N C A 5276 CA1 0SUBSECTION 8....:CABLE DERATINGAND CABLE TRAY FILLj PAGE 8.3-3PARAGRAPH 2; REQUIRES THAT ALL
GIOI IkJRL[ _pIAs E Cl wm at1LLSEPARATED FROM OTHER CIRCUITS BY ADISTANCE EQUAL TO THE RADIUS OF THEI ARGFIU CAALF41
PA GE 57
3LA (KKAN SAS
ORIGINALSTATUSPL TV CA
FOLLOW UP'DIN
FOLLOW UPCLASS.
52!k - - ----
PUNCHLIS'.
DRRNO.
DOC. NO. & REV./REMARKS
D0006 3005 FSAR 3.7-Amend 46Structural checklist inthe appendix of the pro-ject instructions wasgenerated. On page 3.7-18(WBNP-45); line 6; thereference to section3.8.3.8.3 should be tosection 3.7 .3.8.3
D0023 3022 Motor Stress Report
There was no title nordocument number on thereport. Pages A-7, A-8,A-9 were missing
D0109 3114 FSAR 15.4.2.2.-Reviewed for develop-ment of checklist items.
00130 3135 03B-IAFW-R99 R901
00131 3136 03B-IAFW-R225 R2REF DWG FCRH-5941;FCRH-7 213
DOCUMENT TITLE!DESCRIPTION
Seismic Design
Description of seismicdesign criteria andcommitments forstructural; piping andequipment systems.
Seismic: Stress and deflection
analysis of the Parsons Peebles600HP T4007J motor for the IRAFW motor driven pump
FSAR 15.4.2.2
Accident analysis for acondition IV (limitingfault) incident; majorrupture of a mainfeedwater line.
03B-lAP W-R9 9Hanger
03B-lAFW-R225Hanger
NT REVIEW RECORDS (DRR)
B&V RECOMMENDEDCORRECTIVE ACTION
Correct Typographicalerror FSAR pg 3.17-18
Replace missing pages inreport
FSAR editorial corrections
required. See F0303 also
Correct drawing as required
Correct drawing. Also see
F0366 and F0757
TVACORRECTIVE
ACTION
Typographical error corrected inFSAR Revision Package No. 377.This package has been submittedto the Nuclear Licensing Staff ofPower for transmittal to the NRC.
A cover sheet entitled "AuxiliaryFeedwater Pump Motor StressAnalysis" has been added to thereport. The report was originallysubmitted and approved without eithera document number or title page.To further aid in retrievabilitythe report has been entered intoour NEDS document managementsystem (MEB 831127 953). PagesA-7, A-8, and A-9 are actuallyin the file document but wereinadvertently omitted from thecopy of the report given to B&V.
TVA is contacting Westinghouse toconfirm the correct value and will
then initiate an FSAR revision to
make the editorial correction.This item is being controlled by
Commitment Tracking Record (CIR)number WBN-R267.
Drawing 03B-lAFW-R99 was revisedon Revision 902 per ECN 3511 toresolve this finding.
Drawing 03B-IAFW-R225 was revisedon Revision 903 per FCR 11-8296 todocument the installed configu-
ration. B&V had s~tated the draw-ing should be revised perFCR H-7213. FCR H-7213 wasrejected by EN DES and replaced byFCR H-8296.
SCHEDULEDATES
Completed06/22/83
No furtheraction isrequired
12/30/83
Completed I12/01/83 1R
Completed01/28/83
PIJNCUIST 0 T REVIEW RECORDS (DRR)
NO,
DOC. NO0. & REV./DIN REMARKS
D0133 3138 03B-IAFW-R226 R2
D0134 3139 03B-IAFW-RlO2 R904Ref Dwg FCRH-4544;FCRlI-6983; FCRHI-7 208
00172 3178 47W427-220 goThe isometric drawingwas used as a designbasis for AFW piping1. Restraint type andlocation 2. Pipingconfiguration3. Pressure; tempera-ture data 4. Materialinformation 5. Hot andcold allowable stress
D0173 3179 41811427-1pipe size; schedules;
mli*terials; design
p resisures and tempera-tures specified arecon~sistent with thedesign calculations(NOA3-50 through NOA3-55) except as notedabove.
DOCUMENT TITLE/DESCRIPTION
03 B-IAPW-R2 26Hanger
03B-IAFWr~lO2Hanger
113-3-5A System Isometric
Stress Isometric
Piping bill of muaterial-auxiliaryFeedwater
A bill of material for AIRpiping
B&V RECOMMENDEDCORRECTIVE ACTION
Correct drawing as required
Update drawing. Also seeF0717
Investigate and adjustoperating conditions
Correct drawing
TVACORRECTIVE
ACTION
No corrective action is requiredbecause general note #67 on
drawing 47A050 series states thattbe drawing view governs over the
Bill of Material. This note isapplicable to this finding.
No corrective action is requiredbecause FCR H1-4544 referenced inthe B&V corrective action did notadd item 12. This was added perFCR M1-1361 and subsequentlydeleted by FCR H1-6983 on Revision904 of the drawing. Item 8 notwelded on inside is acceptablebaaed on Bergen-Paterson drawing6000-1, note 1. (see findingF17).
This item is the subject of NCRWBN CEB 8215. See Findi ng 1373for corrective action information.
A review of the Document ReviewRecord details indicates nocorrective action or follow up wasrequired by B&V since a check ofmechanical piping drawing47W427-4 R17 indicates no suchpiping exists between check valvesgate valves.
SCHEDULEDATES
No actionisrequired
No actionisrequired
No actioni-srequired
FUNCHLIST D
PUNCHLIS .ENT REVIEW RECORDS (DRR)
DRRNO. DIN
DOC. NO. & REV./REMARKtS
D0174 3180 NOA3-50The calulations werereviewed only for results(pipe size; schedule;material) for comparisonwith bills of material
DO0190 3196 47W427-203 R4Isometric is used as adesign basis for pipestress analysis asfollows: 1. Restrainttype and location2. Piping geometric con-figuration 3. Pressure;temperature information4. Material information5. Stress allowables hotand cold.
D0198 3204 47W427-200 R5The isometric providesdesign information forpipe stress analysis asfollows: 1. Restrainttype and location 2. Pipingconfiguration 3. Pressure;temperature data 4. Materialinformation 5. Hot and coldstress allowables
D0220 3226 47W427-207 R4The isometric drawing wasused as a design basis forAFW piping 1. Restrainttype and location 2. Pipingconfiguration 3. Pressureand temperature information4. Material information5. Hot and cold allowablestress
DOCUMENT TITLE/DESCRIPTION
WBNP Auxiliary FeedwaterSystemMinimum wall thicknesscalculat ionsThe calculations are forminimum pipe wall thickness
System N3-3-1OA; 12AIsometric
Stress isometric showingcomputer node points;restraint locations;temperature and pressureinformation
System N3-3-3A Isometric
Stress isometric indicatingcomputer node points;restraint locations;temperature and pressureinformation
System Isometric N3-3-13+N3-3-14A
B&V RECOMMENDEDCORRECTIVE ACTION
Correct calculations
Correct coefficientof thermal expansion
Investigate & correctoperating conditions
Investigate & correctoperating conditions
TVACORRECTIVE
ACTION
A review of the Document ReviewRecord details indicates nocorrective action or follow up was
required by B&V since a check of
mechanical piping drawing
47W427-4 R17 indicates no such
piping exists between check valves
and gate valves.
Drawing 47W427-203 has been voided
and replaced with drawings47W427-227 and 47W427-228. These
drawings now reflect the correctcoefficient of thermal expansion at40 F.
This item is the subject of NCRWBN CEB 8215. See Finding F373for corrective action information.
This item is the subject of NCRWBN CEB 8215. See Finding F373for corrective action information.
Stress Isometric
SCHEDULEDATES
No actionisrequired
Complete12/08/83
R
01/30/84
01/30/84
PUNCHLIS1
NT REVIEW RECORDS (Daft)
DOC. NO. & REV./DIN REMARKS
D0228 3234 WBNP 162Coversheet with TVA
approvals is dated June 19,1974. Note that in table3.7-10 of FSAR the exponentsare mibsing from the WR 2values. This documentindicates compliance withchecklist items E.1; E.3;
E .6; E.14; there is not a
TVA-unique document numberon this report. There is an
EDS number of 0600250-007
D0235 3241
D02 Ib 3282
47W427-218 ROThe isometric was used as adesign basis for 1. Restraint
type and location 2. Pipingconfiguration 3. Pressure andtemperature information4. Material information5. hot and cold stressallowables 6. The auxiliary
feedwater-feedwater
47 W42 7-204-R12The isometric drawing wasused as a design basis forAFW piping: 1. Restrainttype and location 2. Pipingconfiguration 3. Pressureand temperature data4. Material information5. Hot and cold stressci lowab lea
DOCUMENT TITLE/DESCRIPTION
Seismic Analysis of theAuxiliary-Control Building-
WBI4P 1&2
This report describes theanalyses performed to determinethe effects of seismic events onthe Aux-Control Building
Isometric for Problem0600200-05-01Stress isometric
System Isometric N3-3-5A& N3-3-7A
B&V RECOMMENDEDCORRECTIVE ACTION
Editorial correctionneeded FSAR table 3.7-10
Investigate and correctoperating conditions
Investigate and correctoperating conditions
TVACORRECTIVE
ACTION
The missing exponents were addedin FSAR Revision Package No. 377.
This package has been submitted to
the Nuclear Licensing Staff of the
office of Power for transmittal to
the NRC.
SCIIEDULEDATES
Completed05/24/83
This item is the subject of NCR 0/08
WBN CEB 8215. See Finding F373
for corrective action information.
This item is the subject of NCR 01/30/84
WEN CEB 8215. See Finding F373
-for corrective action information.
Stress Isometric
-L [IRNO.
PUNCHLIST
nxi - 1,L/ j'.j/U~J
PIJNCHIAST DOCUMENT REVIEW RECORDS (DRR)
DHHNO. DIN
DOC. NO. & REV./R EM4ARK S
D0278 3284 47W427-201-R5The isometric drawing wasused as a design basis forAFW piping: 1. Restrainttype anid location 2. Pipingconfiguration 3. Pressuretemperature data 4. Materialinformation 5. Hot and coldstress allowables
D0304 3310 47W427-202 R6The isometric was used asdesign basis drawing for theAFW piping: l.Restrainttype and location 2. Pipingconfiguration 3. Pressurearid temperature information4. Material information5. Hot and cold stressallowables
1)0330 3336 14RC Question 040.26it appears this is atypographical error andthe correct reference shouldbe to ClIB' based upon ourreview of their design.Developed item B-34 ofelectrical checklist
D0443 3449 03B-IAFW-R132 RIRef dw& FcRH-6667
D0461 3407 03B-IAFW-V40 RITVA should revisedw& showing existingembedment plate andrevise tag on hangerto shouw V40
DOCUMENT TITLE/DESCRIPT1ON
N3-3-4A System Isometric
Stress Isometric
N3-3-llA
The temperature and pressureinformation reflects the AFWflow diagram 47W803-2 R16except as noted below
NRC Question TVA ResponseConcerning FSAR
Addresses TVA's degree ofconformance to RegulatoryGuide 1.106
03B-IAFW-RI32Hanger
03B-IAFW-V40Hanger
B&V RECOMMENDEDCORRECTIVE ACTION
Investigate and correctoperating conditions
Investigate and correctoperating conditions
Correct typographical error
Update drawing as required
Correct drawing
TVACORRECTIVE
ACTION
This item is the subject of NCRWBN CEB 8215. See Finding F373for corrective action information.
This item is the subject of NCRWBN CEB 8215. See Findi ng F373for corrective action information.
Typographical error corrected inFS&R Revision Package No. 373.This package has been submittedto the Nuclear Licensing Staff ofthe Office of Power for trans-mittal to the NRC.
Drawing 03B-1AFW-R132 was revisedon Revision 902 per FCR H-6667 toresolve this finding.
No corrective action is requiredbecause general note #2 on 47A505series allows Construction todelete the anchor plate and weldthe structural member directly tothe embedment plate. Constructionwas not originally required to taghangers and when QCP-4.23 RU wasissued on 7/10/72, the requirementwas not retroactive (see F'indingF743). No drawing change is needed.
SCHEDULEDATES-
601/30/84
Competated-05/24/83
Completed08/15/83
No actionisrequired
DOC. NO. & REV./REMARKS
D0464 3470 03B-lAFW-R239 RiRef dwg FCRH-7 590
D0465 3471 03B-IAFW-R49 R2Ref dwg FCRH-4785
D0466 3472 03B-1AFW-R146 R903Ref dwg FCRH-1808:FCRH-67 86; FCRH-77 87.Info on ref dwgFCRH-1808 andFCRH-6787 has beenincorporated on hangerdwg
D0467 3473 03B-IAFW-R39 Rl
D0470 3476 03B-1AFW-R045 R902Ref dwg FCRH-6560FCRH-8439. Info onref dwg FCRH-6560has been incorporatedon hanger dwg
00473 3479 03B-lAFW-R173 R5
D0482 3488 03B-1AFW-R162 RiRef dwg FCRH-8173FCRH-8334;FCRII-6793; FCRH-7579;FCRH-6793. Info onRef Dwgs FCRH-8173;FCRH-6793; FCRII-7579&FCRH-6793 has beenincorporated on hangerdwg.
DOCUMENT TITLE/DESCRIPTION
03B-lAFW-R239Hanger
03B-lAFW-R49Hanger
03B-IAFW-R146Hanger
03B-IAFW-R39Hanger
03B-IAFW-R045
03B-IAFW-Rl7 3Hanger
03B-1AFW-R162Hanger
B&V RECOMMENDEDCORRECTIVE ACTION
Update drawing
Update drawing
Update drawing
Correct drawing
Update drawing
Update drawing
Update drawing
TVACORRECTIVE
ACTION
Drawing 03B-IAFW-R239 was revisedon Revision 902 per FCR H1-7590 toresolve this finding.
Drawing 03B-1AFW-R49 was revisedon Revision 903 per ECN 3511 toresolve this finding.
Drawing 03B-IAFW--R146 was revised
on Revision 904 per B'CR H1-7787 toresolve this finding.
No corrective action is requiredbecause general note #3 on 47A050series allows Construction todelete anchors and weld the baseplate to the embedment plate. Nodrawing change is needed.
Drawing 03B-lAFW-R045 was revisedon Revision 903 to resolibe thisfinding.
Drawing 03B-1AFW-R173 was revisedon Revision 906 per FCR H1-8484 to.resolve this finding.
Drawing 03B-IAFW-RI62 was revisedon Revision 901 per FCR H1-8334 toresolve this finding.
F HEDULEDATES
Completed12/28/82
Completed12/12/83
Completed12/08/ 82
No actionisrequired
Completed.I12/12/83
Completed01/28/83
Completed12/09/82
PUNCHIS¶I T REVIEW RECORDS (DRR)
DRR DOC. NO. & REV./NO. DIN REMARKS
D0483 3489 03B-IAFW-R230 Rl
D0522 3558 47W600-6 R4The l-L-222 shownat A3/T is aty~ographical error.It should be l-L-214
D0575 3611 03B-2AFW-R35Ref dwg FCRH-8131
D0580 3616 03B-lAFW-R235-R902Ref dwg FCRH-6300;FCRH-7082 Info onref dwg FCRH-6300has been incorporatedon hanger dwg
D0582 3618 03B-IAFW-Rl29-RlRef dwg FCRH-689FCRH-76 58
D0583 3619 03B-lAFW-R130-RIRef dwg FCRH-6067FCRH-8210 Info onref dwg FCRH-8210has been incorporatedon hanger dwg
D0584 3620 03B-IAFW-Rl4l-RIRef dwg FCRH-6792FCRH-7346 Info onref dwg FCRH-7346has been incorporatedon hanger dwg
DOCUMENT TITLE/DESCRIPTION
03B-IAFW-R230Hanger
Electrical Instruments &Control
Plant a rrangement-Reactor/Aux Bldg. Elev. 713
03B-2AFW-R35Hanger
03B-1AFW-R23 5Hanger
03B-1AFW-RI 29Hanger
03B-lAFW-R1 30Hanger
03B-lAFW-RI41Hanger
B&V RECOMMENDEDCORRECTIVE ACTION
Update drawing
Correct typographical error
Update drawing
Update drawing
Update drawing
Update drawing
Update drawing
TVACORRECTIVE
ACTION
Drawing 03B-1AFW-R23O was revisedon Revision 903 per ECN 3511 toresolve this finding.
Drawing 47W600-6 was, revised onRevision 8 to correct the panelnumber and resolve this finding.
FCR H1-8131 referenced by B&Vwas rejected by EN DES sinceanother FCR H1-7612 was open.Drawing 03B-2AFW-R35 was revisedon Revision 901 per FCR 11-7612.This change also implemented thechange identified on FCR 11-8131.
Drawing 03B-IAFW-R235 wasrevised on Revision 903 perFCR H1-7082 to resolve thisfinding.
FCR 11-6892 referenced by B&Vwas rejected by EN DES andsuperseded by FCR 11-7658.Drawing 03B-IAFW-R129 wasrevised on Revision 902 perF'CR 11-7658 to resolve this finding.
SCHEDULEDATES
Completed12/01/83
Completed11/10/ 83
Completed03/30/83
Completed03/30/83
Completed09/ 20/83
Drawing 03B-lAFW-R130 was revised Completedon Revision 902 per FCR 11-8210 to 12/06/83
resolve this finding. The originalcorrective action indicated FCR H1-6067fwould resolve this finding, however,FCR H1-6067 was superseded by FCR 11-8210and the drawing was revised accordingly.
Drawing 03B-lAFW-R141 was revisedon Revision 902 per FCR H1-6792 toresolve this finding.
Completed03/30/83
PUNCHLIS1
PUNCLISTDO~i VIEW RECORDS (DRR)
DOC. NO. & REV./DIN REMARKS
3658 47A427-2-29-RORef dwg FCRH-8200
D06 2 3 3659 47A427-2-8-RIRef dwg FCRH-7 251and 8248 Unit 2 pipingnot installed. Info onref dwg FCRH-7251 hasbeen incorporated on thehanger dwg
DO6 24 3660 47A427-2-11 RlRef dwg FCRH-7 254 and8291 unit 2 piping notinstalled. Info on refdwg FCRH-7 254 has beenincorporated on thehanger dwg
D0625 3661 47A427-2-15 RORef Dwg FCRH-8243
D0626 3662 47A427-2-30 RORef dwg FCRH-8174
D0627 3663 47A427-2-18Ref Dwg FCRH-8278
DOCUMENT TITLE/DESCRIPTION
Mechanical sesinic supportfor aux. 1Feedwater pipingsupport detail 2-29Hanger
Mechanical seamic support foraux. Feedwater piping supportdetail 2-8
B&V RECOMMENDEDCORRECTIVE ACTI-ON
Update drawing
Revise drawing.
Hanger
Mechanical seismic support foraux. Feedwater piping supportdetail 2-11
Hanger
Mechanical seismic support foraux. Feedwater piping supportdetail 2-15
Hanger
Mechanical seismic support foraux. Feedwater piping supportdetail 2-*30
Hanger
Mechanical seismic support foraux. Feedwater piping supportdetail 2-18
Update drawing
Update drawing
Update drawing
Update drawing
TVACORRECTIVE
ACTION
Drawing 47A427-2-29 was revised onRevision 1 per FCR H-8200 toresolve this finding.
Drawing 47A427-2-8 was revised onRevision 2 per FCR H-8248. Thedimension change on location planfrom 71-6" to 7'-0O" is not requiredbecause Construction SpecificationG-43, Section 2.8.1.3 allows up to6" movement of the support along the
pipe axis for pipes smaller than 6".
Drawing 47A427-2-11 was revised onRevision 2 per FCR R-8291 toresolve this finding.
Drawing 47A427-2-15 was revised onRevision I per FCR B-8243 to resolvethis finding.
Drawing 47A427-2-30 was revised onRevision I per FCR H-8174 to resolvethis finding.
Drawing 47A427-2-18 was revised onRevision I per FCR H-8278 to resolvethis finding.
SCHEDULEDATES
Completed12/08/82
Completed -
12/15/82
Completed08/15/83
Completed12/09/82
Completed12/15/82
Completed01/28/83
Hanger
DRRNO.
D062 2
PUNCHLIST DOCI
PUNCLISTDOCU 'IEW RECORDS (DRR)
DOC. NO. & REV./REMARKS
47A427-2-4 RIRef dwg FCRH-7 247and 8388. Infoon ref dwgFCRH-7 247 has beenincorporated on thehanger dwg
DOCUMENT TITLE/DESCRIPTION
Mechanical seismic support foraux. Feedwater piping supportdetail 2-4
B&V RECOMMENDEDCORRECTIVE ACTION
Update drawing
TVACORRECTIVE
ACTION
Drawing 47A427-2-4 was revised onRevision 2 per FCR H-8388 to resolvethis finding.
Hanger
D0629 3665 47A427-2-5 RlRef dwg FCRH-7248and 8387. Info onref dwg FCRH-7248has been incorporatedon the hanger dwg
D0630 3666 47A427-2-16 RORef dwg FCRH-8244
Mechanical seismic support foraux. Feedwater piping supportdetail 2-5
Update drawing
Hanger
Mechanical seismic support foraux. Feedwater piping supportdetail 2-16
Update drawing
Drawing 47A427-2-5 was revised onRevision 2 per FCR H-8387 toresolve this finding.
Drawing 47A427-2--16 was revised onRevision I per FCR H-8244 toresolve this finding.
Hanger
D0631 3667 47A427-2-3 RIRef dwg FCRH-7 246and 8389. Infoon ref dwg FCRH-7246has been incorporatedon the hanger dwg
D0632 3668 47A427-2-27 R0Ref dwg FCRH-8276
D0650 3686 47W427-8 R1ORef dwg 47W427-204Rev 4 piping reviewedon dwg 47W427-8Doesn't show on dwg47W427-04 but was acontinuation from it
Mechanical seismic support foraux. Feedwater piping supportdetail 2-3
Hanger
Mechanical seismic support foraux. Feedwater piping supportdetail 2-27
Hanger
Mechanical auxiliary feedwaterpiping
Piping iso for misc pipingaround steam driven pump lA-S
Update drawing
Correct drawing
Revision I per FCR H-8389 toresolve this finding.
Drawing 47A427-2-27 was revised onRevision 1 per FCR H-8276 toresolve this finding.
Since the B&V review, a companiondrawing 47W427-221 RO was issuedwhich shows the informationcontinued from 47W427-204. Thisaddresses the B&V concern.
D0628 3664
SCHEDULEDATES
Completed02/01/ 83
Completed01/28/83
Completed12/15/82
02/01/ 83
Completed02/01/83
Completed02/24/83
PUNCHLIST DOCU
PUNCULST DO REVIEW RECORDS (DRR)
DRRNO. DIN
DOC. NO. & REV./REMARKS
D0737 3777 47427-1 RIOThe piping span fromthe drawing 47W427-2to the anchor (box)on isometric47W427-200 isapproximately 26'.Review of this pipeby onsite person~nelindicate onlytemporary supports
D0817 3878 47A427-1-1 RI
D0818 3879 1l_03A-453 R904
DOCUMENT TITLE/
DESCRIPTION
Nechanical auxiliary feedwaterpiping
Piping drawing of a portion ofthe pump recirculating piping
47A427-1-1Hanger
1-03A-453hanger
B&V RECOMMENDEDCORRECTIVE ACTION
Investigate and correctsupports as required
Update drawing
Update drawing
TVACORRECTIVE
ACTION
Temporary supports mentioned havebeen addressed generically in thefindings. No corrective actionwas required by B&V.
Drawing 47A427-1-1 was revised onRevision 2 per FCR H1-6887 toresolve this finding.
SCHEDULEDATES
No actionisrequired
Completed04/18/83
Drawing 1-03A-453 was revised on CompletedRevision 905 per FCR H1-10,433 to 12/01/83
resolve this finding. The originalcorrective action indicatedFCR H-8288 would resolve this finding;however, FCR H1-8288 has been super-seded by FCR B1-10,433 and the drawingwas revised accordingly.
D10819 3880 45N47A427-3-l RO
Ref dwg FCRH-7791
Mechanical unit 1 seismiccat I support for aux.feedwater support det 3-1Hanger
Update drawing Drawing 47A427-3-1 was revised onRevision I per FCR H1-7791 toresolve this finding.
03/30/83
PUNCHLIST DO
EVALUATION OF DRR CORRECTIVE ACTION
Drawing No.
D0006
D0023
DO0109
DO0130
DO0131
DO0133
DIN No.
3005
3022
3114
3135
3136
3138
Document Reviewed*
TVA Form 3 DIN 3005 andattachment
TVA Sigmen Discussion andattachment
TVA Memo and CTR Sheet
Drawing 03B-1AFW-R99, Rev. 902
Drawing 03B-1AFW-R225, Rev. 904
Mechanical Hanger DrawingGeneral Notes 47A050-IB, Rev. 6
Remarks
TVA submitted a Form 3 and a copy of Memo-randum NEB 830622261 indicating correctiveaction has been taken.
TVA submitted a copy of the cover sheetalong with a signed statement indicatingthat the missing pages were, in fact, inthe file copy of the report.
TVA submitted a copy of Commitment TrackingRecord (CTR) WBN-R267 indicating that theitem has been placed in a formal programthat will assure close out. This responsewas cross-checked against the F303 Form 3response and found to be identical.
TVA submitted a copy of revised drawingindicating that the required correctionswere made.
The B&V observations cited in this DocumentReview Record are no longer valid since theField Change Request listed was rejected.The documentation provided by TVA indicatesthat significant design changes were made.
The TVA position that a drawing revision isnot necessary is supported by Note 67 ofDrawing 85M 47A050-lB, Rev. 6. This issueis considered cleared.
Status
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
EVALUATION OF DRR CORRECTIVE ACTION (Continued)
Drawing No.
DO 134
DIN No.
3139
D0172 3178
Document Reviewed*
Drawing 03B-1AFW-R102, Rev. 904
Finding F-373
Remarks
The original comment is no longer applicabledue to changes. The welding issue wasresolved per the disposition of the originalF717 finding. Documentation submitted byTVA confirms that subsequent changes havebeen made to the hanger.
This item has been reported to the NRC andis the subject of a Non-Conformance Report.In view of the fact that the issue is beinghandled via a formalized program, the issueis considered resolved under present projectguidelines.
Drawing 47W427-4R17 Reexaminationconfirms thatdesignated as
of the Document Review Recordthis item was improperlya punchlist item.
See D0173
Drawing 47W427-227, Rev. 1Drawing 47W427-228, Rev. I
See D0172
See D0172
TVA Form 3 DIN 3234 withattachment
Reexamination indicates that this item wasimproperly statused as a punchlist item.
Examination of the drawings providedindicates that the coefficients of thermalexpansion have been properly listed.
See comments for DO172.
See comments for D0172.
TVA submitted a Form 3 and a copy of Memo-randum NEB 830622261 which indicates thatappropriate corrective action has been taken.
DO0173 3179
Status
Resolved
Resolved
D0174
DO0190
3180
3196
DO0198
D0220
DO0228
Resolved
3204
3226
3234
Resolved
Resolved
Resolved
Resolved
Resolved
EVALUATION OF DRR CORRECTIVE ACTION (Continued)
Drawing No.
D0235
D0276
D0278
D0304
D0330
DIN No.
3241
3282
3284
3310
3336
DO0443 3449
D0461 3467
D0464 3470
D0465 3471
Document Reviewed*
See D0172
See D0172
See D0172
See D0172
Remarks
See comments for D0172.
See comments for D0172.
See comments for D0172.
See comments for D0172.
Finding F-119 and attacheddocuments
Drawing 03B-1AFW-R132, Rev. 902
See D0133
Drawing 03B-1AFW-R239, Rev. 902
Drawing 03B-IAFW-R49,'Rev. 903
The TVA submittal of Memorandum NEB 830524264 indicates appropriate corrective actionhas been taken. This is a report of theF119 item.
The TVA Drawing 03B-1AFW-Rl32, Rev. 902indicates that the drawing has been revisedto incorporate the specified changes as wellas other changes.
TVA Drawing 85M47A050-lB, Rev. 6 permitswelding hangers to existing embedded platesin lieu of utilizing surface mounted plates.This can be interpreted to indicate thathanger detail drawings need not be updated.
The revision description for TVA Drawing03B-IAFW-R239, Rev. 902 indicates that theFCR has been incorporated.
The drawing print submitted by TVA confirmsthat corrective action has been completed.
D- 3
Status
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
EVALUATION OF DRR CORRECTIVE ACTION (Continued)
Drawing No.
D0466
D0467
DO0470
D0473
DO0482
DIN No.
3472
3473
3476
3479
3488
D0483 3489
D)0522 3558
Document Reviewed*
Drawing 03B-IAFW-RI46, Rev. 904
Mechanical Hanger DrawingGeneral Notes 47A050-1T
Drawing 03B-1AFW-R045, Rev. 903
Drawing 03B-1AFW-R173, Rev. 906
Drawing 03B-1AFW-R162, Rev. 901
Drawing 03B-IAFW-R230, Rev. 903
Drawinig 47W600-6, Rev. 8
Remarks
Revision notes on the TVA drawing indicatethat appropriate corrective action has beencompleted.
Note 3 of TVA Drawing 47A050 permits thewelding of anchor plates to existingembedments in lieu of using bolt anchors.This implies that hanger drawing need notbe updated to reflect the as-built conditionnoted in this Document Review Record.
The TVA drawing revision notes indicatethat the required changes, as well as otherchanges, have been made.
The TVA drawing revision notation indicatesthat appropriate updating per this DRR hasbeen completed.
The TVA drawing revision notation indicatesthat the hanger drawing has been updated toincorporate the FCR cited in the DRR, aswell as to incorporate other changes.
The TVA drawing indicates that the requireddimension changes were made and that thehanger attachment for 03B-IAFW-R229 wasshown.
The drawing has been corrected as indicated.The item is closed.
Status
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
EVALUATION OF DRR CORRECTIVE ACTION (Continued)
Drawing No.
D05 75
D0580
D05 82
D05 83
D0584
D0622
DIN No.-
3611
3616
3618
3619
3620
3658
D0623 3659
D0624 3660
Document Reviewed*
Drawing 03B-2AFW-R35, Rev. 901
Drawing 03B-IAFW-R235, Rev. 903
Drawing 03B-1AFW-R129, Rev. 902
Drawing 03B-1AFW-R130, Rev. 902
Drawing 03B-1AFW-R141, Rev. 902
Drawing 47A427-2-29, Rev. 2
Drawing 47A427-2-8, Rev. 2
Drawing 47A427-2-11, Rev. 2
Remarks
The TVA submittal indicates that the subjecthanger has been redesigned subsequent to theB&V review. The item is considered closed.
The revision notation indicates that thesubject FCR has been incorporated.
The notations on the TVA drawing along withthe matrix notations indicate that appro-priate action has been completed.
The TVA drawing as clarified by the TVAcorrective action description supportsclose out of this item.
The copy of the hanger drawing forwarded byTVA indicates that it has been revised toincorporate the changes defined by B&V aswell as other changes.
Revision notes on the TVA hanger drawingindicate that the changes defined by B&V,as well as other changes, have been made.
The TVA drawing and matrix information wererevised in conjunction with the partial G-43specification attached to the original F799finding. The item is considered closed out.
Revision notes on the TVA hanger drawingindicate action is complete.
D-5
Status
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
EVALUATION OF DRR CORRECTIVE ACTION (Continued)
Document Reviewed*Drawing No. DIN No. Remarks Status
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
D0625
D0626
D0627
D0628
D0629
D0630
D0631
D0632
3661
3662
3663
3664
3665
3666
3667
3668
Drawing 47A427-2-15, Rev. 2
Drawing 47A427-2-30, Rev. I
Drawing 47A427-2-18, Rev. 1
Drawing 47A427-2-4, Rev. 2
Drawing 47A427-2-5, Rev. 3
Drawing 47A427-2-16, Rev. I
Drawing 47A427-2-3, Rev. 2
Drawing 47A427-2-27, Rev. I
Revision notes on the TVA hanger drawingindicate required action is complete.
The revision notations on the TVA hangerdrawing indicate that the required actionhas been completed.
The revision notations on the TVA hangerdrawing indicate that the required actionhas been completed.
The revision notation on the TVA hangerdrawing indicates that the required actionhas been completed.
The revision notation on the TVA hangerdrawing indicates that the required actionhas been completed.
The revision notation on the TVA hangerdrawing indicates that the required actionhas been completed.
TVA provided Revision 2 of Drawing47A427-2-3 which indicates that the FCRhas been incorporated.
The revision notation for the TVA hangerdrawing indicates that the required actionhas been completed.
D-6
EVALUATION OF DRR CORRECTIVE ACTION (Continued)
Drawing No.
D0650
DIN No.
3686
DO0737 3777
D0817
D08118
3878
3879
D0819 3880
Document Reviewed-
Drawing 47W427-221, Rev. 1
Not applicable
Drawing 47A427-1-1, Rev. 2
Drawing 1-03A-453, Rev. 905
Drawing 47A427-3-]., Rev. 1
Remarks
The drawing forwarded by TVA provides thenecessary cross reference to the miscel-laneous piping drawing. The item is closed.
Reexamination of this DRR indicates thatthe item was an observation rather thana work item. The TVA position isreasonable and the item is consideredclosed.
The hanger has been redesigned and therequired FCR incorporated.
The revised drawing and TVA correctionaction description indicates that correc-tive measures have been taken.
The revision notation indicates that thehanger drawing has been revised to includethe FCR cited in the DRR.
'These documents have not been reproduced for this report.
Status
Resolved
Resolved
Resolved
Resolved
Resolved
TENNESSEE VALLEY AUTHORITYWATTS BAR NUCLEAR PLANTAUXILIARY FEEDWATER SYSTEM
INDEPENDENT REVIEW
SUPPLEMENTARY REPORT
APPENDIX A BOOK 1FOLLOW-UP DATA
B&V PROJECT NO. 10520
Issued: February 7, 1984
TVA CONTRACT NO. TV-60052A
FORM 310520DIN521110520.92.0000ref: 10520DIN3525
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F /1 /0/
Commnents pertinent to finding:Auxiliary oil pumps not automatically monitored. Auxiliary oil pump motorstarter auxiliary contact wired to computer for status monitoring.
Corrective action completed. TVA drawing 45W760-3-3, Revision 8 attached.
Program Tem Member
OEDC Program Manager Dt
airman, 0 7Policy C-ommittee
Black & Veatch ~ 7V us-~. ~ ~ ~ a.~.
Classification: Type
ý/010 & Veatch Project Manager
Black &'Veatch Senior Review Team Chairman
Category 49
Date
Date
3/tiý 71 ZDa ee
14, L3Date
///Ziý 9 ý) ,/ Date
FORM 3 10520DIN508810520.92.0000ref: 10520DIN4249
WATTS BAR'NUCLE.AR PLANTINDEPENDENT REVIEW
Finding Number IF /1 /0 /1
R-PL
Comments pertinent to finding:
47W610-3-3 was revised to show correct instrument locations and to agree withthe 47W600 series. The FSAR was revised to include auxiliary feedwater flowin Table 7.5-1. All corrective action is complete.
Attached is copy of ECN 3647.
j~CLRProgram Team Member
OEDC Program Manager
Chairman, OEDC Policy Committee
q/(,Date
I'4~3/Date
Date
Black & Veatch -74 -a,,
Classification: type I]
alA& Veatch Project Manager
Black & Veatc'i Senior Review Team Chai~rman
___________________ Category LI?
Date
12 5-43Date
£11,
.I- .
TENNESSEE VALLEY AUTHORITYDI VI S ION O F ENG INEE R ING DES I GNI.W 8 s Bar Nudlw u~FM1~t i~llg L 1
TO: Construction Project ManagerSWP 204 GB-K
From: Design Project Manager
ECNNO. 36 '/77rl
M
Was IJ Analysis Required: Yes No
&4A~4 i~em: ~2//
7
y 'd gs. /. -- A~CCz __________
Prepared by Section Leader
1" ~~~~~~~Released: -''~~&~y-JOtProject Engineer 1 Design Project fnager Dt
*SCOPE
Project ý(497r3 .9- /e0d/2 Affected Unit(s) / .System or Feature / 67 -16-767 (32 NC1 WI20 S&P 826.Reference & Oescrlp fC6 /6 o r .__ i cvt4.5 V 'D 7;0-4
S.~V-,.- - -/ CI O
(n DRAWINGS dq'a0j"UKVOLVED: QJ)YestsWuired) or
No
V4 Mechanical 3 A C ?4
S NUCLEAR PROJECTS DESIGN GROUPS
Civil A/__
* Electrical I I-.Mech
FOSSIL. flD10 A SPECIAL PROJECTS DESION
SPECIAL DE31I( PROJECTSA1
A ARCHITECTURAL SUPPORT BRANCH
PHYSICAL WORK MUST BE DONE BEFORE:
P1.OOI~tF.61I%'Tharm
Date BranchData SheetAvailable
fComm'i lIt
Tes Loa weIe I '-1ueUnit(s) l
CC (Attaclmqwti): *Yes.L~1fs
CHI EF, ARCHITECTURAL,3SUPPORT BRAICH, URCIZE C-9
CHIEF. ELECTRICAL ENGINEERING BRANCH. vaCuA6 C-9CHIEF. MECHANICAL ENGINEERING MUACH, UTC12A C-NCHIEFr NUCLEAR ENGINEER, WIOCI2A C-9C:iE F. QUALITY ASSURANCE $RANCH. 5100 HIS-
& XE Pk.r IN WE,). f7
ENGINEERING SUPPORT BRANCHES
Approval Required
ECt Iis.eadfr l branch revie .w:
esg rjc Cae Date
Approved. .
Itt IILR. CUM Date
c*' C/Date
Ci'ief Nuclear Engineer Date
Required for PSAR or FSARRequired for Preoperational Test:
- If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report RequiredIf QA AppliesSecurity System Modified
YesojNo
-rv4A 2.?-. 2.-ti-B~t~0A'0
4/0
Vendor(s) involved:
S6-CHIEF. COST PLANNING AND CONTROL STAFF. W12C7sC-CHIIEF. SPECIAL DESIGN PROJECTS. W20224 -ANAUGER OF CONSTRUCTION. E7324 C-9
PLANT SUIPERINTENDENTHEDS. WSIA3 C-K
ENGINEERING CHANGE NOTICECOVER SHEET SWP V8 02 14
(BEFORE ISSUANCE OF OPERATING LICENSE)
Ar-1.4 A /07 'C I Aly) X / L)
I
DATE _FEB 14d 00
TENfiVSS!EF VALLEY AUTHORtlDIVISION OF ENGINEERING OESI
ENGINEERING CHANGE NOTICE NO. 3qG N DATA SHEET NO.L.....
Watts Bar Nucleer Pkiat, Spring iy1 T
Design Project Manager S'~-'1 4~o Gr-BFEB 14 13
Released By: Z I ( /'D~esign Project Manager
Preparing Section MEDS Accession No. EDAcesion No.
C7/Ci R c'WD W 0 14 ý570-Prepared 0~~I 4By: ios-s 7 45;fW19z1 - ________________
Total Pages (RO): 2.Seto WP V 0412Z 523 51_ __ _ _
Supervisor: RStaff Eng. Q9f 6Architect: A'/A4 2
GroupHead: 'r 4 RR
3 7Branch I_ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _
Chief: Dte
Project /¼73c9 116ArifAffected Units //Z.System or Feature ,4'x,1-toe 5pýyS~ 7-2Fz,-7 3
Reference & Description of Change Bel,- er 06v,,goe Fotfwlo 5 7-60~A'Ab s
,/oqj At7: F030 (#66 W014 WP 9267)
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUPBRANCH ECN D.P. OSIINORESONTOTALNO.* ISSUED PA RED SUPV. HEAD CHIEF CLERK MGR. DSRPINORESONPAGES
aterials as follow s: A A ealInformation:
CN I EF. COST PLANNING AMC CONTROL STAFF. WIT a- PIAT SUPERINTENDENTCNIEF. ARC HITECTIJIAL SUPGPORT IRMANCH. Wacz4C-K CONSTRUCTION PROJECT M"ANAGECHIEF* C I VIL ENGI EERING RAnCMW90224 C-K MEOS. W5h63 C-9CHIEF. ELECTRICAL ENGINEERING BRANCHI. WOC124 C-11K0 AIS. 640 CST2-CCHIEF. SPECIAL DE3IGA PROJECTS. W20224 C-K1
BRANCH
1f
PAGE
. TENNELSEE VALLEY AUTHORITYCjlV(SION OP ENGINEERING DESIGN. PAGEEKENGINEERING CHANGE NOTICE No. 346'1 7
DATA SHEET NO. /
I ~IINEAFFECTED1 OWG ISSUE DATE IL O
UN__IT D-RAWING OR S'M NUMBER JRýEV.:XECE ]ACTUAL REMARKS RNEO
z4
,1 1
,d ,~--q-1f- 3 ; LAI
J 4'7We,'/- 3-3 14
T-N;tE-. VALLEY AUTHORITY ENGINEERING CHANGE NOTICE NO. 364-7DVSNF ENGINEERING DESIGN 1
)esign Project Manager SP204 G5.KEB 14198
Released By: 9' ý4 esign Project Manager
Preparing Section MEDS Accession No. MEDS Accession No.
#3epared3 0214f 57I4BY: w-. 7- E 7F=$T6.Total P3ges (RO): R R
Scin /Z1 51
Supervisor: R*j~.~-.E RIStaff Eng. or 6Architec-t: if) ?-.Le~d)Group ,.6'R RH ead: q 37Bach ate SCP
~i~t /~77J~ qg A~c~wSCLOPE Affected Units
System or Feature /?&'X1,L/A'g)' FFWP L-4Q 7-t, Syse4Reference & Description of Change RVI/ st FA? To' /NcC' XP0/Z4T'
179F F2'XiL-Jf?RX F'EFPW)?TER FLOLV4. REFEgZ 7-0
Q3012 Veld e23.8 . I (cR'iwP92,7)
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE -
REV. DATE PRE- SECT. GROUP BRNHECN O.P. DSRFINORESONTOTALNO. ISSUED PARED SUPV. IHEAD CHIEF ILERK MOGR. ESIPONFRVSONPACES
Fiz. -0 riais as follows:
Adr. Information:
CHIEF. =ST PILANSI AS* COITROL STAFF. V12C75 C-K PLANT SUPE91STENDENT00EF. tcI TCIRL 3vPT0T BRAI, WCH. w26 C-K CORSTRJCT10I PROJECT NAIACER
CHIEF . Cý; KIL UJIUI EE164 IRAUCM.vW90224 c-19 - "ARKS. 5630 CZT-CCHIEF . a.ECTO 'CAL E*" IEEEEIIG BRNCHe, WIC226 C- ARS.60 ST-CHIEF . S;EIIAL ~E31GA P.J CT3. W20224 C-K
BRANCH 615584
'PAGEL
ENGINEERING CHANGE NOTICE NO._______DATA SHEET NO .
P.
AFFECT~n lOwaI ISSUE DATE REAK
UNIT DRAWING OR B/M NUMBER tREV.I EXPECTED ACTUALREAK
g~p 7ThRLE 7~~~-/ /313/983 ';--,r)q~ tj;)I-ý>(
K"' 7i~*
I ___ I _________ ___ ___ ___________I. __ _________
I
I. ____ _ I
__ I ________ __
__ I ____________
_ I ____ _ I
__i ________ __ .1 ____
__________________ _______________________________________________________________ ___________________ I
-H---__ _________
___ I__
II_
____ I _______________ I
I __ I _________ ___ ___ I
TENNESSEE VALLEY AUTHORITY3ivisicON OF ENGINEERING DESIGN.
FORM 3
WATTS BAR-WNCLEAR PLANTI',NDEPENDENT REVIEW
10520DIN507810520.92.0000ref: 10520DIN4250
Finding Number IF /1 /0 /2/
R-PL
Comments pertinent to finding:
47W610-3-3 was revised to show indicating lights for 'HS-3-179A/B and -179B/Band the correct locations for LM-3-172, -173, -174, and -175. All action iscomplete.
Attached is copy of EGN 3647.
Program Team Member
OEDC Program Manager
Ch mai n, OEDC Po Committee
11;[/Date
Date
Date
Black & Veatch
Classification: type Category 14
Black & Veaech Senior Review Team Chairman
Dat
Date
-4 12
ENGINEERING CHANGE NOTICECOVER SHEET SW!' W8 02145
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGNfa&tv8 s Bar N~ud1WEk~t-irQZLI&
To: Construction Project ManagerSWPO 204 GB-RK
From: Design Project Manager
DATE FEB Id10,4Was IJ Analysis Required:
ECN NO.- 36.'17
Prepared by'~ (~f
Project Engineer
Project • 4 75,9~q't Affected Unit(s) / 6'Z
System or Feature ,1 - /~SYr#- (.3) NCI? Wp1J swP'!2L-7
Reference & Descript* -Sf NM' 115o 60CA-rf01- 'L VP ".4 /c RX1W 5r &A/0 7;0-Z
4 ~!d~tj41 '1CK~I ~1~A _S Y:1. CIO Z.
/~/o 3 7. FI&vDRAWINGS VOLVED:Q)14s
El 4PPORT BRANC
Mechanical A/2..
NUCLEAR PROJECTS DESIGN GROUPS
Civil AIDElectrical 61yesMech 1C
* FOSSIL. HIDinG A SPECIAL PROJECTS DSIGN
SPECIAL DESIGN PROJECTS
ARCHITECTURAL SUPPORT BRANCH
RISICAL WORK MUST BE DONE BEFO RE:
r Tst Load Power-
Unlitlis)
Date BranchData SheetAvailable
&cMMI I st fIOoer'n I RefuelI
CC (AttacnmevIt): -y *?ift
CHIEF. ARCHITECTURAL SUPPORT BRANCHO. WICISS C-1CHIEF. CIVIL ENGINEERING BRANCH. W90224 C-KCHIEF. ELECTRICAL ENGINEERING BRANCH. WBC126 C-9CHIEF. ECI4A ICAL ENGINEERING BRANCH. W7CIZS C-KCiIOIEF. NUCKLEAR ENGINEER. WIOCC16 C-11CHIEF. QUALITY ASSURANCE BRANCH. 5100 NiBO
ENGINEERING SUPPORT BRANCHES YesApproval Required
ENis e for branch review:
ýeinProject Mc ager at
Approved:-
/MiCI VIL 81. Cirz Date
CME Date
Chieif Nula nineer Date
Required for PSAR or FSARRequired for Preoperational Test:
- If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report RequiredQA AppliesSecurity System ModifiedVendor(s) involved:
Yes oj No
"SoA~d we
CH IEF. COST PLANNING AND CONTROL STAFF. 11ZC204C1CHIEF. SPECIAL DE3IGN PROJECTS, W20220 C-19MANAGER OF CONSTRUCTION, ETNSI C-9PLANT SUIPERINTENDENT"EDS. USIA) C-k
No
I
'N
*TENNESSEE VALLEY AUTHORITYf ENGINEERING CHANGE NOTICE No. 34e *C'IVISION OF ENGINEERING DESIGN DATA SHEET NO..L.......
.Waits Bar NucIew Platf, Spring City~ TI
itBRANCH S
PAGE 1.L
Released By:Design Project Manager SN~p 7 O1 GH-IFEB ,4iaJ3
t11 Dsgn Project anager
Preprin SecionMEDS Accession No.w MEDS Accession No.Prearng ecion~ R SAD ~ 2 k 7 R
-PreparedOO I4
Total Pages (RO): 5Section 04_____1,2:______5___23__
Supervisor: RRStatff Eng. 404 2 6Architect; NIA__ _ _ _ _ _ _ _
"'dGroup RRHead, 3 7Brranch__ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief: D;a~teSCP
Project ./'-'3 9t¶ (/t64r Affected Units /1 .
\\ystemn or Feature 4'/4d V,-b §y--,()
Reference & Description of Change O6 e,41r~q& 70~IdiC P~4//~S
f ~~~: V45<. rer r 1
- SE .E ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUPBRANCH ECN D.P. OESCRIPTION4 OF REVISION TOTAL
NO. ISSUED PARED SUPV. HEAD CHIEF CLE RK MGR. PAGES
*Ial Information:
CHIEF. COST PLANNING AND CONTROL STAFF. W12C74 PLANT SUPERINTENDENTCNIEF. AORCHITECTURAL SUPPORT $RANCH. WRC12B . CONS TRUCtION PROJECT MANAGERCNIEr. CIVIL ENGINEERING BRANCH.WWI9DZ2N C-K HEDS . W596) c-K
CHIEF. ELECTRLICALSENGIN"EERING BRANCH. WBUC1216 c-i ARMS. 640 CST2..C
CHIEF . SPECIL DESIGN PROJECTS. W2022R C-9
TZ.ANESIlss VALLEY AUTHORITYON~ ISION OF ENGINEERING DESIGN-
ENGINEERING CHANGE NOTICE No. 3 4-:9 7DATA SHEET NO. IL
li-'PAGE ElI
ISSUE DATE ILINEAFFECTED OWO N OA ETUNIT DRAWING OR BIM NUMBER REV. EXPECTED, ACTUAL REMARKS REV.
I/- 7e)/v__174V4__ __ IL.
-- 3 31
10520ODIN5 00010520.92.0000
WATTS BAR NTUCL!aAR PLANTrINDEPENDEN'T 3REV=I,
ref: 10520DIN4304
Finding Number / F / 1 / 0 / 3/
R-PL
Conmments pertinent to finding:
Revised 47W611-3-4 to agree with 47B601-46 and 45W600-46-6.action is complete.
All corrective
Attached is ECN 3647.
Program Team Member
OEDC Program Manager
1174
Date
Date
Date
Black & Veatch 2~~tV ti
Classification: type
VeAatc Poe c Ma ge
Black & Veatch Senior Review Team Chairman
Category __________
Z/ t -Date
Date
FORM 3
ENGINEERING CHANGE NOTICECOVERSHEET SWP W8 0214 5-
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIG'ýVtl Bar Nudw Ei" 91104 ina QZM~k
To: Construction Project Manager
ECN NO. 3 6 e/7
From: Design Project Manager
DATE lid 1 MAO
Was IJ Analysis Required: Yes No 1_
Prepared by
Project Engineer
Project Z64r-4~75 -e de ~.dSystem or Feature/ 6 tA t S s7 ,'
Affected Unit(s) / .
Reference & Descripti f 3-0/ O/~O. 9 V -4/~2C~~14. ? ' A
f'7 DRAWINGS dq I VOLVD.Yets u~ired)-' - or
411ýird)No
CEIG PPORT Bl1ANC
Mechanical \4Q
Nu/NUCLEAR PROJECTS DESIGN GROUPS
Civil d.oElectrical yes
metru
FOSSIL. HYDRO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS
ARCHITECTURAL SUPPORT BRANCH
CC (AttaChm@%tq)- M. YesCHI EF. ARCHITECTURAL SUPPORT BRANCH. WSC126 C-4CHIEF. CIVIL ENGINEERING BRANCH. W90224 CKCHIEF. ELECTRICAL ENIGINEERING BRANCH. WBC126 C-N9CHIEF. MECHANICAL ENGINEECRING BRANCH. WWI~IZ C-KCHIEF. NUCLEAR ENGINEER. WIQC126 C-9CHIEF, QUALITY ASSURANCE BRANCH. 5100 oiB-
IFC/064.Date BranchData SheetAvailable
Approved.
AMf CIVIL BR. CHLDt
3 1LECT CALJ 81. Nz-g' at
CifNuclear Engineer Date
Required for PSAR or FSAR Yes oiN_______ Required for Preoperational Test: 6 A
If Yes, Test No. Z . z--Vendor Backcharges Involved A/ goSeismic Analysis Required d/
.tNonconformance Report Required 4efulQA Applies V6FS
Security System Modified 1410Vendor(s) involved: 40______A/6____
CHIEF' COST PLANNING AND CONTROL STAFF, HI*C75 C-CHIEF: SPECIAL DESIGN PROJECTS. .2D225 C-19HANAGER OF CONSTRU CTION. ETISS C-9PLANT SIJPERINTUNDENTNEOS. W5161 C-9
SWP 204 GB-K-
167 . FtOýQf
.A10
1! " - - I 'p- -,#ý Fz,,V-,e ý
TEIWZZýSEE VALLEY AUTHOR IDIVISION OF ENGINEERING OESI
-Y ENGINEERING CHANGE NOlGN DATA SHEET NO...Waits Bar Nuies' Plwat, Spring City~j TN~
Design Project Manager SWR '704 "K.~FEB 14Ai~3
riCE No. 3 4 BRANCH rSki
Released By:.,PG L.t1- esign Project Manager
Preparing Section MEDS'Accession No. MEJ ccsin No.
Ry / SWp 0l214 5 7 UPrepared 0 LJ Iin4
By: elps 7-6;r i - __________
Total Pages (RO): 2wP 3 4 R
Supervisor: R RStaff Eng. 2Architect: NVA 2Group RHead: ý37Branch ____________________
Chief: ate
Project SCOPE~4~A4t46AA I?1 Affected Units //2
System or Feature A,4x e- 4,t/ '6 / ,i'5 ~vt 4-f .5ysrza U3)
Reference & Description of Change Otarillr5 4A,, i9* o' lc. A64WI^45 7-0
-/0 0C1, 7 .10. ~6 (NCW WON 60 9Z2&7)-1
--- --- SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE. SECT. GROUPBRANCH ECN D.P. DESCRIPTION OF REVISION TOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR . PAGES
V-,'- 9- 2G---- A1 ,4 2
T
CHIEF. COST PLANRING ASO CONTROL. STAFF. W1204C-9 PLANT SUPERINTENDENTCHIEF. ARCHIITECTURAL SUPPORT BRANCH, W4CJ2s C..g COONSTRUCTION CPROJECT MANAGERCHIEF, CIVIL ENGINEERING BRUANC.WWd9022 C-K HEOS. 5SS63 C-KCHIEF: ELECTRICAL ENGI NEERING BRANCH, wecizA6 C-9 ARMS. GW4O CST2-CCHIEF . SPECI At DtSIGO PROJ ECTS. WZ2022 C-K
r.'ENNESSEFE VALLEY AUTHORITYO'VISION OP ENG1INEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. 3(a-'1DATA SHEET NO. I.
14PAGE ElI
AFFECTED1 IOwa] ISSUE DATE LINUNIT DRAWING OR R/ UBER .REVJ CUA RMAK
HZLL Z12eJeti-3-3 133
-Irw
FORM 3 10520DIN507910520.92.0000ref: 10520-DIN3911
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F /1 /0 /A
0-PL
Comments pertinent to finding:
47W605-8 was revised to show the-174. All action is complete.
Attached is copy of EGN 3647.
6g~'GL-Program Team Member
C~)1(LOEDC Program Manager
correct mounting positions for LI-3-172 and
Date
Date
////4/JK3'Date
Black & Veatch
Classification: Type Category ___17_____t_
&Veatch Project Manager
Black & Veatch Senior Review Team Chairman
Date
/2,-/11 5Date
F//I?lv
ENGINEERING CHANGE NOTICECOVER SHEET SWP W8 021.4
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGNýValt Bar NIdIC16 UW 1115itlQ1is~
ECN No. 36947
To: Construction P'roject ManagerSWP 204 GB-K
From: Design Project Manager
DATE -FESB1
Was IJ Analysis Required: Yes No
Prepared by
.Project Engineer
Project ý(4-v7:5 -9,ý e I A'efo e 4-loo
System or Featuret! / '4`L -5S7y r-- 4
Reference & ecpt tCz5 -
Affected Unit(s) /7/-
(3) NCfZ WPrJ SwP8~A~7t ) NC S #A4W Swrat'
/:ý/'0 0-4 7F13- F/6AlCIA-'01,)6 _5 -/ ,/ ic/o z
& )T9~ Pk6r f A 4(ws4w1~, DRAWINGSc ~ OLVED:'Ye
~- or~,uired) No
EEING PPORT IRACC
Mechanical
NUCLEAR PROJECTS DESIGN GROUPS
Civil 1-Electrical 6/YesMech
FOSSIL, HYDRO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS .1?I&RCNITECTURAI. SUPPORT BRANCO
MY4SICAL WORK MAUST BE DONE BEOE
1Pre-Op Ist Fuel I%ThermIITest Load IPoweL
Date BranchData SheetAvailable
Eomm Ii 1s
Unit(s) 2-unitfil
ENGINEERING SUPPORT uRANCHES YesApprovalI RequiredYe
EC iisre for branch review:
esign ProjectMCager at
Approved:
CIVILOR. CDate
CH'I r/Date
YS±ýACAZ- 9Z V IV -1;L D. CN11$Date
C 'Ief Ncer Engineer Date
Required for PSAR or FSARRequired for Preoperational Test:
If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report Required
SQA AppliesSecurity System ModifiedVendor(s) involved: ______
Yes oj No
~ldldy 6
CC (Attachmewf%):r-
CHIEF, ARHTCIV I JL SUPPORTIN BRANCH, W9 CISO C-9 CHIEF, COST PLANNING AND CONTROL STAFF. W12C7N C-*CHIE, CVIL NGIEERNG NANC, vRZZRC-NCHIEF. SPECIAL DESIGN PROJECTS. WZD20225C
CHIEF. ELECTRICAL ENGINEE41NG BRANCH. WOC126 C-11 NARAGER OF CONSTRUCTION, E7824 C-4CHIEF. MECHANICAL ENGINEERING BRANCH. VTC126 C-6 PLAN T SUP ERaINTUNDENTCHIEF, NUCLEAR ENGINEER. W:oC126 c-c HEDS. W5%) C-%CHI F, QUALIT ASSURANCE BRANCH. 8100 NiS-Nt
":-
&&4~J ~em' ~//
TENNESSEE VALLEY AUTHOR IIDIVISION OF ENGINEERING OESI
Y ENGINEERING CHANGE NOON DATA SHEET NO..
Watts Bar Nuclw Plavt, Spring CityA TN~
Design Proiect Manager SWp )04--Ga..K
.FEB 14 1Z,
riCENo. B~; RANCH
Released By: 61esg Poet Pg E L!4(./ DsgnPrjetManager
Preparing Section MEDS Accession No. - ES cession No.
4 C7-,f/C44- R S~ #83 n'l 57 R
- Prepared 0~lI~WJ~ 41I By: $53s~ /&9:5;r,*i / - IR__________
Total Pages (R0): 5~Section W__P__mono___041___2:__523____
Supervisor: R RStaff Eng. QV' N14 6Architect:2Group * RRHead: 7
Branch r _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief: teSC PAfetd
U isZProject .A114173 1%'¶ /e-46AA %4VrAfetd nt /fSystemi or Feature ,xuod 6 s,.7, Y 27(3
Reference & Description of ChneQe. e4-Id.Cp6',*w,W4 5 715
~~ g1..4ek~~~116 W6 6ArC' W'AP/6 9Z & // 7' O3
R~ftN
Iterials as fo llo w s: l a d .-6 s D 4 , S 1
I ~ ~ /~d /E3 tS8 -a~.r(
C IEf. CIVIL ENGINEERING BRANCN.WW90224 C-11 ARMS. S640 CST-KCHIEF. ELECTRICAL ENGINEERING BRANCH. WISC126 C-K AS OCT-CNIE. F:SPECIAL DESIGN PROJECTS. 16202211 C-K
.TF.NNE5SEFJ VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN-
Z-0PACE EKIENGINEERING CHANGE NOTICE NO. 364-, 7
DATA SHEET NO. I.
AFFECTED1 OWG ISSUE DATE I LINE I
UNIT DRAWING OR B/M NUMBER REV. AXETDj CTUAL REMARKS ND
4'IAS A /A - --~ 3 LA
417alooa-a7,dol~~~- '7, I A-- 2
____________________ 13 4
105 20DIN500110520.92.0000
WATTS BAR NUCLEAR PLANTINDEPENDEN'T REVIEW ref: 10520DIN4251
Finding Number /F /1 /0 /5/
R-PL
Comments pertinent to finding:
The schematic was incorrect in showing the AUX-NOR switch connections. Theconnection diagrams which show how the switch was actually wired were reviewedand found to be correct. The schematic diagram (.45W760-3-1l R5) was revised-andissued to correct this drawing error on FGR E-3458. All corrective action iscomplete.
References: FCR E-3458NCR WBN1SWP8267-Rl
Note: This finding is identical to Finding F805.
Program Team Member
OEDC Program Manager
Black & Veat ch / A . S 4..-ceA. pLa~
Classification: type Category
ea- VeachPrjet ange
Black & Veatch Senior Review Team Chairman
43
Date
Date
FORM 3
Date
Date
Date
-i!NFFSFF Y'~~ AL~'''1 .. 'P-j- -1l
F1IFLO MIANGF pFP"'ý 5T Attmchimcnt A
FPF7LY MOnR.ANPP Fr:P. E-3458DOC
TO. J'. C. Standife~r, Sequovah and Watts Bar Design Projects 'Manag~er, 204 GB-K (3)
F~Guente-r Wadewitz, Project M4anager, Watts Bar 'Nuclear Plant CO(NST
Attention: 1W. M. Roop, W3A18 C-K
SFC-I0N T CONFT RF.OUFST
Feasor for Cha-npe: Statul Point:3
X Dr.,wing Discrepancy X Prior tr-, F;,,el r'.ir i acka?.o Nc'. -NWork PIan No. ___TA _
Iiltt After Fuel Loardiny btprinr
Const .ruction to Closir.g ('apitjizýýAzcn'1:2-t5
Additional Pesign - After C1Qojflz CanjtAi~'74-
Inforr'atioTn Acco!'tnts for the Poitire Plant
Doririments Affected 56031R
Yarked documents required an~d attached X YP3 N
Document revision re.-t!ire(I X Ye r___
C Dcrpio:Change transfer switch reeecsas indicated on the attached drarig
C>~r~ eauestd by: E. E. Burroughs, ~ -
Clag- prvdCharles Fisher _____10-29-82-(ae
Apnrrvarfl obt~iinm by: X T e I rn P Ct e
Anrp-"'.ee for trafl5!ittfll to EN DES: ____-l.- / -
~v~iJL.~----------------------------------------- --------------- -- . -------
TY - F'N pr'~ RFPLY/9F10.1O!J'TN
3,0
Corpnler)
C/0""nipl - eturn to CONST by EN F)ES
C Re Ptained by CONST untii originA' iN rreturn-1
Co'V 2 -Retained hy FN DFS
c')-)V 1 - etained by QC&R
YIEDS, 100 tJB-9
DIVISION OF: ENGINEERING DESIGNNONCONFORMANCE REPORT
MEDS Accession NY 1 Bp '83 0818 050
EW REPORT NO. TABNSUTP8267 R-- - r ---
JPAN WATTS BAR NUCLEAR PLANT IWUNIS i3PREPARER/ORGANIZATION/DATE J. D. Coliins/WBP/August 17, 1983JDESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch* third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, Pill, F114, F115, F116,F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, P806
Approximately 24 drawings have been identLf ied with minor discrepancies.
6DDATE OF OCCURRENCE EST X),I ACT. ( 1978 SIGNIFICANT CONDITION ADVERSE TO QUALITY
7] -t=.OD OF DISCOVERY Third Party Review YSC N
- - OE(EN DE-EP 8.1) -. BRANCH4 CHI EF/DATE j
I 12CORRECTIVE ACTION: The minor electrical drawing discrepancie's identified by Black ndVeatchhave been corrected on the following ECNs and PCRs:
ECN 2816 - F123, P124ECN 3647 - P161, F102, F103, P104, F106, F107, F114, F130, F131ECN 3650 - Fill, F115, P117, F127, F141, F803, F806FCR E-3458 - F105, F805FCR E3508 - F110, F116, P802, F804
2 CTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NO
NONCONFORMANCE REPORT01REPORT NO.
Ze/.
116 ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
THIS IS A GENERIC CONDITION YES 13 NO 0
mi ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
INDEPENDENT REVIEW:
LABOR EST. (X.ACT. 1320 mH SCHEDULE EST. (X 1. ACT.I
ACTIVITY NO. *SeBlw~ TASK DESCRIPTION DATE INITIATED *S(
M5REMARKS: *EON 2816 -Act. No. DZ85-E281669 Date 11/29/82EON 3647 -Act. lid. DZ85-E364725 Date 01/17/83EON 3650 -Act. No. DZ85-E3650R6 Date 01/28/83
ThiXs NCR supersedes NCR WBNSW~P8267 RO.
R7DISTRIBUTION: L L NDSATO OPEECONST PROJECT MANAGER J. D. Collins, 5100 MIB-K ~IALE E CINCMLT
SEN DES PROJECT MANAGERCHIEF. ESBOFFICE OF QA
NE=B (for Significant NCRsP H*I*R
NSRS (for Significnt NC~qs)ASSISTANT TO THE MANAG3ER OF OEDC lQuality WBP I8 8 8 0
and Nuclear Sarety ey-for Significant NCRs 8 8 8 09*OtSTRIBUTE AFTERJHISUtItNATURE ________________
HANOCAR.RY COPY TO .NE"-LS MEDS ACCESSION NO.
FORM 310520DIN500210520.92.0000
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number / F / 1 /0 / 6/
O-PL
Comments pertinent to finding:
Revised 47W611-3-3 to remove themotor-driven auxiliary feedwatercomplete.
Attached is a copy of ECN 3647.
ref: 10520DIN3912
blackout safety injection signal from thepump start logic. All corrective action is
Program Team Member
QEDO Program Manager
Chtr Qat, OE licy Committee
///7/93Date
I Date
Black & Veatch 7'v j /d..,*F%~ AI,
Classification: type Category .4
Black & Veatch Senior Review Team Chairman
411/ /P-2Date
Date
,;ýL, -,,x
FORM 3
ENGINEERING CHANGE NOTICECOVER SHEET SWP W& 021.4
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGNW8ats Bar Nud(W 31109iQ CLMk
To: Construction Project Manager
From: Design Project Manager
ECN NO.- 36 '17
SWP 204 G"-
Was IJ Analysis Required:. Yes - No
Prepared by
Project Engineer
- Project 147 f,~%~System or Feature A /A 4 ~44-eg 5 ~ 4
Affected Unit(s) ~ .
f L) NCO, W84g SW~P8ala7Reference & Descri t' I C t oA i~ C Cv-~4. A4 4-
7'" 0 1"d~A YO ~ o~j'~/A ; 7 F/A~'Y~ Ff04.6 N1A Y-Pk Pklexr AffVI).4f P
DRWNS dqW3 7$'VOLVED:'
ECRIIIG PPORT IRNA i54C /'I
ctricl -,6S; "_Mechanical % B~
Nuitot A1NUCLEAR PROJECTS DESIGN GROUPS
Civil
-Electrical -SI
Mech
FOSSIL. HYDRa A SPECIAL PROJECTS DESIGN
SPECIAL 0E31GR PROJECTS 1
ARCHITECTURAL SUPPORT SURACK
PHYSICAL WORK MUST BE DONE BEFORE:
Pr-pItFuel 1%Therm
Unit(sl
CC (Attacrim~wsq: at.Ye
CHIEF. ARCIHITECTURAL SUPPORT IRANCH. WRC126 C-KCHIEF, CIVIL ENGINEERING #RANCH. W90224 C-9CHIEF. ELECTRICAL ENGINEERING BRANCH. WOC126 C-KCHI EF, MECHANICAL ENGINEERING IEANCH. VIC126C-CHI EF, NUCLEAR ENGINEER, W10CIZ6 C-6CH IEF. QUALITY ASSURANCE ONANCH1, 5100 9IS-
Date BranchData SheetAvailable
ENGINEERING SUPPORT IRANCI1S YeApproval Required
MEC is e dforý branch review:
einProject Mo ager bt
Approved:
C!NL i. CNMI Date
CII E/Date
rAfN- clear Engineer Date
_________ Required for PSAR or FSARRequired for Preoperational Test:
If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report Required
Ist QA Appliesfu elSecurity System Modified
Vendlor(s) involved:I I
Yes oj No
'iAAdE W7. zler
V/
~ t 40-4CHIEF, CO3T PLANNING AND CONTROL STAFF, U1204 C-NCHIEF, SPECIAL DESIGN PROJECTS, VZD2ZR C-11MANAGER OF CONSTRUCTION, [L7124 C-9PLANT SUPERINTENDENTNEDS, VS9B3 C-K
DATE FEB 14 Ml
Comm'lOaer'n Re
TEWP.,ESSEE VALLEY AUTHORlDIVISýION OF ENGINEERING OESI
'Y' ENGINEERING CHANGE NOCAN DATA SHEET NO..Watts Bar Nuclew Ptaot, Spring City, TN~
Design Project Manager S\AIR214.-C9.KFES 4 la3a
rICENO. 34417 BRNC
Released By: '7~ PAGE Iý,(/- esign Project Manager
Preparing Section MEDS Accession No. - ES cesion No.
C7/4~/ R S Qp o214 570 R
Prepare!, 0~lI 4By: 0-s- _________ __
Total Pages (RO): 5ADfit) ~ )Section U?&C JC~J 04 -:-2Supervisor: R)744yv.~Q RStaff Eng. N1,4 6Architect: //A2Group * R RHead: 9'A'a501 3 7
Chief: at SCP
Project AlTr57 ~d Affected Units //Z.
S ystem or Feature ~/~ 'tIt§s-~,- 3Reference & Description of Change 279 if'S r vz-~ee 9A-pZ zoe e-, 5~/i' 70
/A ~ if7 VA-+rC-,4 #A71A1, 6 Ae-S )CI 0. C16 Z O3
/ --Io -/7. Fip 3NC o8~ P~
WW
at,~
rM
Ro
-- 4ý--SEE AASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUPBRANCH ECN D.P. DESCRIPTION OF REVISION TOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR. PAG ES
V- -z-3 f 7c7 "~e /2-- '2 24.L
aterlals as foiiows:4 C
alInformation: J,?i441cn. A mtC &J
CHIEF, COST PLANINIG AND CONTROL STAFF, WIZC79 C-9 PLANT SUPERINTENDENTCHIEIF. ARCHIITECTURAL SUPPORT BRANCH, W4CI26 c-1 CONSTRUCTION PROJECT MANAGERCOI EF. CIVIL ENGINEERING BRASCN.WWO022I C-K NEDS. W58S3 C-9CHIEF. ELECTRICAL ENGINEERING BRANCH. WOC126 c-K LAWS. 640 CST2-C
CHIEF . SPECIAL DE SICI P ROJ ECTS. VZ2D22 C-K
TEPNN&ý-SE VALLEY AUTHORITY'IVISION OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. 36117DATA SHEET NO. I
IAFFECTEDI rWG ISUE DATE LNE
UNIT 4 RAWING OR B/M NUMBER OREV. ACXET fTUAL REMARKS RE
~91tS A /,~ - -~ - -;
q - 131
PAGE LJ
14-11- V5 I24-f-lqq-/3-83
FORM 3
WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW
10520DIN508010520,92.0000ref: 10520DIN4252
Finding Number / F/1 / 0 / 7/
R-PL
Comments pertinent to finding:
47W600-57 and -60 and 47W610-3-3 were revised to show the correct locations forLM-3-172, -173, -174, and -175 and to agree with 47B601-3- series. All actionis complete.
Attached is copy of ECN 3647.
Program Team Member
OEDC Program Manager
ai nOEDC ].licy Committee
11 gF.IF 3Date
Eate
Black & Veatch IZ222/i40
Classification: type Category- ,
16) ~%ck f&"Veatch -Project Manager
Black & Veatch Seir eiw Team Chairman
Date
Date
-_ý _/ ZZII
ENGINEERING CHANGE NOTICECOVER SHEET SWP W~ 021.4
(BEFORE ISSUANCE OF' OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIG'IVats Bar NulW3114512QI
ECN NO. 36'/7
m0: Constructlion Project managejr
From: Design Project Manager-
DATE FEB 14 idjpWas IJ Analysis Required:
Prepared by
Project Engineer
SWP 204 GB.K
Project /~4~17S ,~9~&C L~9d Affected Unit(s)-/'/~
System or Feature / >' ,.6'4A$','5 ,# (3) NCR Lti&J SwF~82L7Reference & Descrlpt' f C 1V//3 if CXO0rrdA~e 5. /CI 7;044 s-P-/ r
A/~, ;6AIGs dQW-WVOLVED .Q~
(EIRSN PPOIT 8At'O47
Mechanical 1V0
NUCLEAR PROJECTS DESIGN CROUPS
Civil 4.)o-Electrical $1 -
Mech
FOSSIL. NYDNO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS 4 eANRCITECTURAI. SUPPORT BRANCH
.Pre*Op Ist Fuel, J%Therm1Emma
IUnit(sl~.j j7- ~ jJUnit(s)
Date BranchData SheetAvailable
ENGINEERING SUPPORT BRANCHES YeApproval Required 4
E is ea dforA branch review:
ýeig Drjc CIaeate
Approved:
Ad$ CVIL 81. CDate'
Date
ý MNP .C1 Date
M 2_______vv 2-11ACxiNuerl Enineer Date
_________ Required for PSAR or FSARRequired for Preoperational Test:
If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report Required
Ist QA Appliesfuel Security System Modified
-H--i Vendor(s) involved:
CC (Attacflmeeti): B"'S .3J,$CHIEF. ARCHITECTURAL SUPPORT BRANCHI. IARC12 C-N CHIEF. COST PLANINGS
-. CHIEF, CIVIL EMGIICERIRG BRANCH. W90226 C-9 CHIEF. SPECIAL 01510I. CHIEF, ELECTRICAL ENGINEERING BRANICH. WIC126 C-K MANAGER OF CONSTRUCT
CHIEF. MECHIANICAL ENINIEERING BRANCH. VC12S C-K PLAIT SUJPERINTENDENTCHIEIF. INUCLEAR ENGINEER. VIOC126 C-I1 MEDS. W51163 C-9fCMhIIF. QUALITY ASSURANCE 11*1CM. 5100 MIS-
Yes or No
.410
. 4tl AO
AiD CONTROL STAFF. WIZC74 C-9IPROJECTS. W20224C-
ION. E7824 C-9
No
Sod:"J,
NVCRzi x6g a6j- +r0<Fn& V,Oct AY) x / a /-
TNNESE YALE AUTHORITY-'JIVý!SION OF ENGINEERING DESIGN
Design Project Manager S\.
ENGINEERING CHANGE NOTICE No.___DATA SHEET NO.L.....
atts Bar Nuclear Ptaot, Spring QIlyA TN
BRANCH k
PAGE LIReleased By: ~ 5;647:%ý-
4V,. esign Projet Manager
R Natrasasflo :
4JIA#AC(./&aDli4 LS'(.
alInformation:
CHIEF. C03T PLANNING AND CONTROL STAFF. WlZC74 C-9 PLANT SUPERINTENDENTCHE.ARCHITECTURAL SUPPORT BRANCH. W4CI2Oc- CO NSTRUCTIONCPROJECT MANAGER
CHIEF. CIVIL ENGINEERING SAC.W02 - ES SS -CHI EF. ELECT'RICAL EINEERING SRANCH. VOC126 C-N ARMS. 64O CSTZ-C
CHIEF. SP ECIA DE31SOIG P ROJECTS. WD2022 C-K
Preparing Section MEDS Accession N3. - ES cesion No.
0"/ 1sw R &3 02.14 5 70U1ABy: ýrosz •_69i'7941 - _ __________
Total Pages CR0): ?
Section ýWP 041-Z 523 51 __ _ __ _
Supervisor: RRStaff Eng. geN1A 6Architect: I'A
SGroup R RHe'ad: 411.S~I69 3 71Brranch__ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief: SCOPe
Project ./-7 %d 4' Affected Units /~
System or Feature /4i 6 ~r§;~/3
Reference & Description of Change_ eev~ro4. 4A.-Z o dvic 7-o-*',4~ST
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE.
RIEV. DATE PRE- SECT. GROUP RANCH ECN D.P. DSRPINORESONTOTAL-NO. ISSUED PARED SUPV. HEAD ýCHIEF CLERK MGR. DECITO EIINPAGES
12 '704 IGB-K
*TENINIMEE VALLEY AUTHORITYCiVISION OF ENGINEERING DESIGN.
9-zPAGE I
ENGINEERING CHANGE NOTICE NO 4eDATA SHEET NO. I.L..
DRAWING OR filM NUMBERDwa ISSUE DATEREV. EXPECTED L.ACTUAL
7 i
-- RAIN OR -/ NUMBER~"4tREMAR KS
S-IL
7e- a_ 0 I-
_________________00______o
_________________________ /_____________q_____ -___________________ 3I
AFFECTED
10520DIN500310520.92.0000
WATTS BAR NUCLEAR PLANTL1DEPE' NDENT REV=- 4
ref: 10520DIN4253
Finding Number /F /1 /1 10
R-PL
Comments pertinent to finding:
This error was also detected during the final wiring verification test No. 6-61.EN DES was notified by CONST via the existing Field Change Request procedure.
The connection diagram (45B1767-2B R7) was revised and issued, and the wiringwas correctly installed per FCR E-3508. All corrective action is complete.
References: FCR E-3508NCR WBNSWP8267 Ri
Note: This finding is identical to finding F804.
Program Team Member
OE:DC Program Manager
// g,1,?Date
AMC J"Date
' Date
Black & Veatch a~A~ ~
Classification: Type Category -11
Bi ~JckA9Veatch Project Manager
Black & Vdatchi Senior Review Team Chairman
&I/ 142Date
2I/ A3Date
FORM 3
FCR L-35A
R~EPLY ý'!h0RA?!DUX E--50
.1 rDOC
C. St.-Inlifor, Scquoyahi and Watts Bar Design Projects '-'anager, 204 GB-K (3)
.wnc- ..c'ZPro~ject Manager, Watts Ear Nuclear Plant CONSTa
~:K I ( 7 *1
N.Roop, 1%3A18 C-K
-- '. 7rChn
7.-c 1 1i t . t C'
Construct ion
xAed~tional Dlesign
!nformrat ion
-curCn [s Af rec ted
4.d (1 0Cur'cfltS re
rtnr t rrw scn requ
.iLpies r5cIpL ion:
status Point:
X Prier to Fuel. Loading
After Fuel Loading but prior
System "o. 3Vork Packag No N/_AWork Plan NIo. N/A
to Closing Capitalized Accounts
After ("losing Capit--''P~dAccounts for th, Entire Plant
45B1767-2A R6, -2B R6; 45B1769-2A R6, -2B R7; 451,,1767-4 R9, 45W1769-4 Rll
....... L ... ;-4JWZ/bJ1-4 i(); 4>i3Ii/bI-t R,4B62E R7
~quired and.,attached X ye- - '
x Yes* red
Clarify the attached drawings to reflect the marked changes.
.,Inge requested by: E. E. Burroughs, Jr
(CONST Engineer)
~--cpprcoved bv:
-- ' ohtained by:
Charles Fisher.
(EI2 DES Fngineer)
X Telephone
12-3-82(Date)
0-th or
''.cei for transmittal to FIN D0:
SWI '83 0217 101 --------n-in-e)-Pr----t-----
7 1 N DES RrP.PY/PEý0LVTI0t:
Date Issued ---- ? ~-
4g 6' s w, 2~ 7,1 7 9 - 2A R / : 45w 1 4 t I2L.,6 '41 7 1, 7-2 ,Ei1
I. c , r C 1 1 (? t'2 n e e 7iignProjec t ei-.azer)
* P. I-UTIC to flOlST by [JI T)FVSVo t .i riflfd by CiONST ti lt i I nri no1 s re ti, rnvel
1 11011.' by OULR
('pg te)
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
MEDS AccessionlNWIBP "83 0818 050
PLAT W~SREPORT NO. UTBNSWP8267 R
PREPARER/ORGANIZATION/DATE J. D. Collins/WBPIAugust 17, 1983 ~ UI
DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch'third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, F111, F114, F115, F116,F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
6 DATE OF OCCURRENCE EST ( X). ACT. I)1978 SIGNIFICANT CONDITION ADVERSE TO QUALITY
7 2--THOD OF DISCOVERY Third Party Review YES C] NO [
" DE (EN DES-EP 8.01) 1130 -BRANCH CHIEFIDATE , '3
1COR ECIEATO:The minor electrical drawing discrepancies identified by Black 'and Veatchhave been corrected on the following ECNs and FCRs:
EC1N 2816 - F123, F124ECN 3647 - Fl~l, F102, F103, F104, F106, F107, F114, F130, F131ECN 3650 - Fl11., F115, F117, F127, F141, F803, F806FCR E3458 - F105, F805FCR E3508 - F110, F116, F802, F804
.. ... .
12J CýTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NO
ID DESIGN CRITERIA DOCUMENT NO. ,EXCEPTION REQUEST NO.
1:]ECN REQUIRED QI YES NO(: ECNNO. 2816, 3647, 3650 SCHEDULE IMPACT CD P C3 A 3N
NONCONFORMANCE REPORT F1IREPORT NO. trB A"S
17,ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
1171 Thm~ l~ A r~FwFRIC CONDITION YESF~ NOEl
18 ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
19 f`ND0E P END0ENT RE V IE W: x
LABOR EST. (x.ACT. 1 20 MH SCHEDULE EST. (X). ACT.
ACTIVITY NO. *SeBlw~ TASK DESCRIPTIO EN DATE INITIATED *S
REMARKS: *ECN 2816 - Act. No. DZ85-E281669 Date 11/29/82ECN 3647 - Act. 'No. DZ85-E364725 Date 01/17/83ECN 3650 -Act. No. DZ85-E3650R6 Date 01/28/83
This NCR supersedes NCR WBNSW~P8267 RO.
[2?] DISTRIBUTION: AL_ NDSCINCOPEE
CONST PROJECT MANAGER J. D..Collins, 5100 MIB-K ALENDSCTOCMPT:
2] EN DES PROJECT MANAGERCHIEF, ESB
OF FICE OF QA
MEDS CIStANHCI/RG?%SRS (for Significant NCRs)*ASSISTANT TO THE MANAGER OF OEDC (QualityWB'8 018 0
and Nuclear Sat etyl -for Significant NCRs W P 8 8 8 0*DISTRIBUTE AFTER-ThJS5GtNATURE _______________
H ANOCAR.RY COP Y TO .NEB.NLS MEDS ACCESSION NO.
M17 THIS IS A GENERIC CONDITION YES r2 NO 0
10520DIN500410520.92.0000
WATTS BAR NUCLEAR PLAN~T12DEPENDENT REVIEW ref: 10520DI N3913
Finding Number /F/i /1 /1 /
0-PL
Co~ents pertinent to finding:
Wire Nos. 3B02 and 3B01 shown on 45W41767-4 R9 (terminals 51 and 55, l-FCV-3-136B-A)were corrected to read 3BC2 and 3BCl respectively on EGN 3650. All correctiveaction is complete.
Attached are NCR WBNSWP'8267 Ri and ECN 3650.
Program Team Member
OEDC~ frogram Manager
airrman, OE Policy Commnittee
1Date
Date
Black & Veatch
Cla-ssification: type Category A4 -
0Bgck & Veatch Project manager
Black &Veatch Senior Review Team Chairman
FORM 3
1/1/& /13.!Date
Iz-/hAiDat&
¶ ENGINEERING CHANGE NOTICECOVER SHEET sw
(BEFORE ISSUANCE OF OPERATING LICEPE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN -ai BIr udoer Phari, Spring City, 144
To: Construction Project Manager
5..
IJ6~ U120W4
ECN NO.
From: Design Project Manager
DATE JAN 2 01983
SWP 204 GB-K
Was IJ Analysis Required: Yes No L
,Prepared b At
~%z0~4' Released.-t Project Engineer
P4
0 Design PI ject M.SCOPE
Project WATTS BIQR N~el-ER P4AARIT A
System or Feature (3) AI)X) LI RY FEEDW1~A TER SYS TEM
*ffected Unit(s) A.NCR WISHJ 5WE 6:4
Reference & Description of Change
F1. -31 / L/DRAWINGS OR B/M'S lIt
(Data Sheets Requi
NuL;KA* ~PROJE%{IftC'GRO`
Electrical E 2MeoJ
FOSSIL. MICRO A SPECIAL PROJECT$ DESIGN
SPECIAL DESIGN PROJECT$
AICRITECTURA. SUPPORT 53*5C11
-WIP '93 08226 5PH~YSICAL WO RK MUST BE DON:E:BEFOR E.
Pre-Op I1st Fuel I VThemlITest Load PowerI
II.- I
Date BranchData SheetAvailable
YE5 4
6 I;r F11. IIS AS )7'J
ENGINEERING SUPPORT BRAMCNES YesW aApproval Required
ECNr mdinc review:
/Osign Project Mafage at
Approved:
ENS CIVIL Be. CHIEr Date
EN S ELECTRcW; OR. CIIt7 Dat
ENS NECI Lon. OglE? Date2.A
Ch~tNuclear Engineer Date
________ Required for PSAR or FSARRequired for Preoperational. Test:
If Yes, Test No.
39 Vendor Back charges InvolvedSeismic Analysis RequiredNonconformance Report Required
:OMM'I Ist QA Applies__________________ Security System Modified
Vendor(s) involved:
I I I ICCC 191'. ARCNITECTIIR&L SUPPORT 63*5CN. HRCI2& C-6CHIgr. CIvitl ENI.SR(CRING.41*CII. U90224 C-9CNIEF, V' AL ENGINILNINC SlAsChl, WIC11S C-1
f t - Foci..: ... e 0.1' . - : rCA
y4~S(7CUIEF. C0ST PLANNING AND COVITRL STAFF,1 Irt;C7a C-1CHIEF., SPEC IAt DESIGN PkOJECCIS W20724 C-C1415AGEN Of 104STfr)JCTION. E7974 C-A
*1~~
£r2Sectior
anager
6wy4 14r-t
Date
U.~f)
Al Q
.i . :
-&LIN -0
AL
Se tion
NDýi
SE9 VALLEY AUTHORITY-OF ENGINEERING DESIGN
vlwi';i ez N
Design Project Manager s.WP 204 GEW-
ENGINEERING CHANGE NOTICE NO. 3(
Released By:
,eparing SectionF 2Prepared II,
Prepared 5 . FHE
Total Pages (RO):SectionSuevsrStaff Eng. orArchitect: V/A
MEUS Accessionl No.
?Zý nProject Manager
MWS)* ArcCesunn No.- - - -I-I
SWP '83 012055-+ 11
RI SWP '301 5441RHI t ;
5Z2.GroupR[Head: .. #3
Branchs_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief:atSCOPE
Project WATTS BA9R NO(ILEAR PLAANT Affected Units .
SystemnorFeature (3) 4UXILIAR/Y PEFSDWA7E1R 5 YS TFMReference& Description of Change CORRECFT DRAWIN~CiS PER t3LAeX I VEATC~H
FJA~lN4 ~ ~3 ~' Fl FIV PAar*
FIAMM 6 Plý F03; W*.N; P Fil F115:,0 E)7 12; 12
'. .",
- SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUP RANC ECN D.P. DESCRIPTION ORF REVISION TOTAL
INO. ISSUED PARED SUPV. HIEAD _CHIEF CLERK MGR. PAGES
1 - 9- -73R 4(- Wa V-- _ _ _ _ _'
2I1SWe W 0308
rials as follows: NO P)?R LC.0 'DAddTfl5nal Information:
CMIICF. COST ?CANINGE AND COSISOL STAFF. WlC7 C-9 PLANT SUPERINTENDENTCIAI LT. AICISITECTUSAL SUPPORT 94ANCM, W1d26 - C0OESTIUCTI01 PROJECT MANAGERCM I. CIVIL EIGINLERING SIR1CM.W9922S C-4- WE S, V5143 C-9
Ct I? CCTRICAL i'C!-((Ir.INCSAICH. USd125 C-1 ES 50CT-
BRANCH PP E
0
525
EE VALLEY AUTHORITY'O ENGINEERING DESIGN-
ENGINEERING LiANiE NOTILE NU.~~DATA SHEET NO. IL..
FFECTE OWOa ISSUE DATE tN 0 SE
UNIT DRAWING OR RI .M NUMBER REV. EXPECTED ACTUAL I REMARK(S a.-
0 SN(660-3-H i - i~QI
2L-. 45W75)- J12. 2-7'
12- '-45W7-;I -1)O ZL - -
-~J -l f - -- A'LF~
I-S1772 -7-
L.....L W174'J5 12--4-
1252. 7 A 9-1 2.)1.2Z q,5W 2 o -'s 13
7- -~n- -s-c-
-7 14S. 6I
L -- I
I_ _ I I
I _____________
4'I PAGE LI-
-... - - . -1
DIVISION OF ENGINEERI-NG DESIGN~'*.'C7-'J CONFORfAANCE REPORT
MFEDS Acr ,-firn N6.'D 8 ~3l8
R P RE OhT NO. % AAI~S2WS67_R1
] P~NT WATTS FEAR UCKRPLANTrUI
2 -~~jOCANZATON/ATE J. D. Co11ins/1",BP/August 17, 19'83
DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,sche-atic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, Fill, F114, F115, F116,F117, F123, F124, F127, F130, F131, F141, F802,.-F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.I
ýj DATE OF OCCURRENCE EST ( X).ACT. 1978 J SIGNIFICANT CONDITION ADVERSE TO QUALITY
-] tHOD OF DISCOVERY Third Party ReviewYE _ N0L
DE(EN DES-EP 8.01) !11 - RANCH CHIEP/DATE
T! CCOPRECTIVE ACTION: The minor electrical drawing discrepancies identified by Black and V'eatch1-lave been corrected on the following ECNs and FCRs:
-F12'3, F124-F1l-1, F102, F103, F104,-Fill, F115, F117, F127,-F105, F805-F110, F116, F802, F804
F106, F107, F114,F141, F803, F806
F130, F-13136473650
E3508*
21 COWTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES DNODESIGN CRITERIA DOCUMEN.T NO, EXCEPTION REQUEST NO.
41 =CN~ %EOWRED [:N Y ES N07 ;CN NO 2816, 3647, 3650 FPSCHEDULE IMPACT "7 P A
NONCONFORMIANCE RLPORT I I7ý ' *)"
AirSAIG%,L CAUSE: (REQUIRED IF SIfl'NIFICANT)
IU7 THIS IS A GENERIC CONDITION YES NO f
118ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANTI
Iv- N ~P~NENTREVIEW:
1120! 1 BRET.XAT 20 MH f21SCHEDULE EST. IX). ACT .* DA,
122 ACIVIY N *Se BlowTASK DESCRIPTION !N24ý DATE INITIATED *See BeiC
!FiREMARKS: E ECN 2816 - Act. No. DZ85-E281669 Date 11/29/82ECN 3647 - Act. 'No. DZ85-E3647215 Date 01/17/63ECN 3650 - Act. No. DZ85-E3650R6 Date 01/28/83
Th is NCR supersedes NCR WBNsWP8267 RO.
121DISTRIBUTION: AL_ NDSATINCMLT
'~CONST PROJECT MANAGER J. D. Collins, 5100 MIB-K ALEDSACINOMET
S EN DES PROJECT MANAGER iCHIEF, ESEIOFFICE OF CIA_________ _____
NEB (fo. Significant NCRsP RAC CIIOG
MEDS cis BACCH OGE
NSRS (for Significant INCRW i
A:SSISTANT TO THE MANAGER OF OEDC I~uality W P ,'and Nuclear Safety).-for Sionificant NCRs WBP '83 ~ 081 05
DIS TRIBUTE AFTER THIS SIGNATURE I_____________________
i-ANDCARRY COPY TO NEB-NLS IMD CESO O
FORM 3 105 20DIN5 08910520.92.0000ref: 10520DIN4359
WATTS BAR' NUCLEZAR PLINSTINDEPENDENT RE-iEW
Finding Number /F /1 /1 /3/
R-PL
Comments pertinent to finding:
The time delay relay (TDR) shown on the schematics and connection diagrams didnot agree with the time delay range shown on the logi c diagram. The exacttime delay setting is determined during preop testing at which time the requireddrawings are-revised to document the actual time delay. New relays were purchasedwith a time delay range compatible with that shown on the logic diagram. Thedrawings which were revised and issued (per ECN 3334) to correct this discrepancyare: 45W760-3-3 R7ý, 45W760-3-4 R7,' 45B1767-2A R7, 45B1769-2A R7, 45W751-4 R12,45W751-10 Rll, 45BM751 RO. Relays were purchased on Procurement RequestNo. W-3534. All corrective action is complete.
References: ECN 3334NCR WBNEEB8301PR W-3534
Program Team Member
"146iffaLOEDC Program Manager
Cha rman, OEDO)Policy Committee
il1114gDate
V 'at
Date
Black & Vac
Classification: Type _____________Category A
Black & Veatch Senior Revi-ew Team Chairmzn
Date
,Datee
C) (BEI
TENNESSEE VALLEY AUTHORITY*O ".IVISION OF ENGINEERING DESIGN
To. Construction Project Manager-
JEERING CHANGE NOTI.CECOVER SHEET SWP '83 0120
V From: Design Project Manager
AAE Cic*DATE sJmi1 kv
4.1Was IJ Analysis Required:
UI
FORE ISSUANCE OF OPERATING LICENSE'
Walts B~ar thxlkwan~~ri] cly~JI
* ECN NO. 3-33)4/
SWP 20.4 GR-K
Yes N -
ject
SCOPE
ý,Proic IAArT.S R/ R NUC LEAR PLIMIor Feature V b P) 1) qYeSTPM 1
-Section Ltadler: ,1*
tM4.9er Dt
Affected Unit(s)________
NeC! S IJ- SW 8 2,11-1
REVI-SED SeJ1EMADC~ AND if,0NPIEC7-JOk PRAwYItLGI2LOT6
fDiAQ,?AM5 QM/ VAR)OUS INSTRUMENT SETTIAJ. EF
Yes Date Branchor Data SheetNo Available
fly21Qo
Mlectigi - 2
fOSSIL. NTDNO A SPECIAL PROJECTS 0ESIGN
yr~ SPECIAL DESIGN PROJECTS
S AKNCITECTVRAL 3UPP091 INAMCN
PHY4SWALWORtK MUST BE DONE BEOE
-Pie-Op Ist Fuei I%Twma Comm'i IstTest Loadl Power Ooer'n nfleuel
V7'Unit(s)),
/Approveo:
ENS CIVIL OR. C),
___________EN EII% 7 NANICAL 3.CE
Chief Nuclear'Engineer
A-
Date
Date
Yes orNoRequired for PSAR or'-FSAR YESRequired for Preoperatlional Test: hi 0
If Yes. Test Nd:., ~ __________
Vendor Backcharges Involved 0Seismic Analysis RequiredoNonconformance Report RequiredQA Applies*.fSSecurity System Modified hi 0Vendor(s) involved: NO AJ F
CC (Attaellmv~t%): s4CHIEF, ARCHITECTUAtL SUPPrOT RAC.UC2 C-9
CHIEF. CI VILI NGI EERING RANCH. W90224 C-iCHIEF. ELECTRICAL ENGINEERING BRANCH. WOC126 C-9CHIEF HECHANICAL ENGINEERING BRANCH, W7C126C-CHICF ". NCL EA ENGINEER. VIOCISS C-9CHIEF. QUALITY A 3SURAR1CE BRANCH, 9100 HIS-6
-- m oBP6-2 V~2 -5--
CHIEF, COST PLANNING AND CONTROL STAFF. W12C7S -CHIEF. SPECIAL DESIGO PROJECTS. .Wz22a -"ANAGER OF C0N3TRUCTIOa. 17524.C4NPLANT SUPERINTENDENT"GEDS. SSN6 C-N
Reference &
lipA&-
A'TENNES;SEE VALLEY AUTH4ORIT.DIVISIOi-'OF ENGINEERING 0E51
ENGINEERING CHANGE NOTICE NO. 3~L
DATA SHEET NO. I..Wafh; Bar Nucdoar plaoint Sprir, C ty IA
Released By:Design Project Manager SWI'0. k
0 -1-psignProject Manager
Preparing Section MEDS Accession No. cesoN.
Prepared 02 RSW[ 00 R1050By: CIIIRLES C, FISHER - SCV51 _________
Total Pages (RO):(I3 SWP 830314 530 '
RRStaff Eng. or 2Architect: IY/A2
SGro'up ~ 6~RRHe~ 6'3 7
Chief: SCOPE
Project WATES SU~R NUCLEAR PLA~NT Af ,fected Units 1 A2.. 2
System or Feature VARI)OUS SYSTEMSReference & Description of Change REv) .5E1D S C)/JM27Tie- AN D L'ONNE CTION DRAWlAWS C
70 196REE WITH LOWi DIAlGRAMS Ov _VARIOLLS XNSTRUAIEAIT .SET7)NIS.REF: BLAqCK tC Vsqrem, F)ND)NrCvs F)J3: Fiz-9 F)2I' FJ3Z; FAOi:
- - - -SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDEREV. DATE PRE- SECT. GROUP BRANCH ECN D.P. OSRPINFRESONTOTALNO. ISSUED PARED SUPV. 1HEAD. CHIEF CLERK MGR. OECITOO EIINPAGES
I3-lqO2j~hb _ '-b S Dete4e /7 Dw ~ ' .t]s~
,n No. ~P-33 ,
ler~ usa tIlows:
A U inormaion:
CHIIEF. COST PLANINIG AND CONTROL STAFF. duzCTS C-9 PLANT SUPERINTENDENTCHIEF. ARCHIITECTURAL SUPPORT BRANCH, WRC126 C-X CONSTRUCTION PROJECT MANAGERCHIEF. CIVIL ENGINEERING SRAINCN.WW9022S C-1 NED. W5S6 1"'"C3T1_CHIEF.7 ELECTRICAL ENGINEERING BRANCH. WIC124 c-11AMS 4 CT-CHIEF, SPECIAL DESIGN PROJECTS. WZD225 C-K
T__
GRANCH
PGE L!.J W
TENNESSEE VALLEY AUTHORITYDiVISIONOP ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE No. 3 3 3 A
DATA SHEET NO. LI 4'PAGEI]
I____ LINE U D
AFF~ECTED OWO ISSUE DATE NODAUNIT DRAWING OR B/M NUMBER REV. EXPECTED ACTUAL REMARKS RE
Li ll7 Z0 3-f'00- 8'3
HSAI 7?-1 -f _ _ _ _ _ _
)2,2- LI 5W2!60-2-3
I qS4 W760 O-4-f _________
h~a JISW74,-27-2 ________
I P b5N 1Z r3j . 3 1 . /;7 7 -:q
2.. '5N 600-34
;~~- 5Ne 4003-q7 -2 --
JSNLQ -Al -N4. 3-2:93
)2-2 Y.I45pUOO L7-. 7.. L )y SN•M6,06 - 9 7_6 -
12.2 ~~O~- ________
)~~~q: I tX~-6 -Ill- -z4-
z z ~ i5 N h- ------------
.. L~2... 5 gN2, nP -7J 2_________
:rVA 10575E.(EN DES-7-79)
TENNESSEE VALLEY AUTHORITY:,eDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. .33.3 q
DATA SHEET NO.J.
r¶Ofl~AIINi~ rID DIM NI IMDF 0
ISSUE DATE
REMARKS
ILINE UPDATED
rN DATA SHEETREV. NO.
L 2- L.16W760-3I -1, 1,26_ _ _ __ __ __83__ _
2 ~ '4/5WA71e -3-2- (o 3__ __-21_ __ _
1i-z -"IAW760O-3-I12.__P__________ 2--1
2 q5)317 69-~)
t&, -16 7SI -10/~e
,5)N 7 60-.3 02 3 3 3__ ___2_ ___43__ _
*~ ~ IS1 k 5 M7- 0 __ _ ___0__ _ _
1 '1581761-O 00
* L A/5lZ7027 Q
2 L5BZ-76,- 02 0-
4_ S'N(*oa-S7-S q 1± 3 -1 9___ 4S-A) 600 -S7 -Z?- 2- 747__
'sPm (goo-5 7- 2--A ;-j3 '
If SW#6 o-,s7Z -
* ~A 6_ -o- 2 3-11F3 D~~.
L~AJ~o..2343"J-?3 -7__ ___1__ __ _
f-7
PAGE!'
ORAWING OR B/M NUMBER ,."IT,. FACTUAL
'TVA 10575E (EN DES-7-79)
TENNESSEE VALLEY AUTHORITY."DIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO.' 1333'91
DATA SHEET NO.___ PAGE
1ISSUE DATE LNAFFECTED IDWG JND0
UNIT j DRAWING OR B/M NUMBER JREV. EXPCTE ACTUAL REMARKS IREV.
I _ _ _ _ _ _ _ _ _ _ (o 3-IY143 c•IIIL 2 IIW74o -30- 2 7 ~1 __________
1'
m = = = = = ýý
. ....... ...DIVISION OF ENGINEERING DESIGN
NONCONFORMANCE REPORT
Watts Bar Nuclear Plant
MESAcesinNo. EEB TO 11? 90 7
ED REPORT NO. WBNEEB8301I 3UNIT 1 and 2
PREPARER/ORGANIZATIOtN/DATE W. T. Estes/EEB II&C#3, /1-14-835]DESCRIPTION OF CONDITION
There are no procedures for documenting time delay relay setting that are determined bypre-op tests.
j 7DATE OF OCCURRENCE EST (X ),-ACT,( 12/30/82 1-9 SIGNIFICANT CONDITION ADVERSE TO QUALITY
DOF ISCVERBlack & Veatch Finding F-126' )76 YS NB11RANCH C H I EF/AFsi ODE (EN DES-EP 8.01)L,0
F"] CORRECTIVE ACTION:
A special engineering proceA :re ;vill be Written to give the procedure fordocumenting the time delay relay settings.
121 UCKHCTIVE ACTION DEVIATES-FROM A DESIGN CRITERIA REQUIREMENT YES E NcOH12ý, DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO. i
1!ECN REQUIRED YES -!-NO a]ECN NO '51SCHEDULE lkMý'ACT P 0A E]N
I2 PLANT
i
NONCONFORMANC8 REPORT1-ýREPORT NO.
ASSIGNABLE CAUSE: IREQUIRED IF SIGNIFICANT)
0It was not recognized that a formal procedure was required to documentthe time delay relay settings.
171 THIS IS A GENERIC CONDITION YES ( NOE[:
D8ACTION REQUIRE[) TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
Adherence to the special engineering procedure.
A directive has been issued by the Manager of Engineering Design,instructing all design employees to become thoroughly familiar withand to follow all EPs.
Ji INDEPENDENT REVIEW: A6-..r 2/,'.f20 LABOR EST. ( ,ACT. I )MH 21SCHEDULE EST. I I. ACT. (I DAYS
ACTIVITY NO. j 3TASK DESCRIPTION24DTINIAE
251 REMARKS:
This problem exists on BFN and SQN. NCRs have been written addressing thisap fk problem for their plants. All 14BN schematics have been reviewed. The
time delay relay settings not currently specified have been identified inletter from J. C. Standifer to F. W. Chandler dated April 7, 1983 (WBP 830427022). A memorandum dated June 14, 1983 (EEB 830614 939), to those listed fromF. W. Chandler details the interim procedure for documenting the time delayrelay settings. Special Engineering Procedures SEP 83-11, issued October -14,,1983 (EEB 831014 937), gives the procedures for documenting the time delay relaysettings.
F2-7 DISTRIBUTION: 26ALL EN DES ACTION COMPLETE: ICONST PROJECT MANAGER
F [8 EN DES PROJECT MANAGERCHIEF, ESBOFFICE OF GA
_______________
NEB (for Significant NCRs)***RNHCIEIR.DTMEDS C!SBRNHCIFOGDANSRS (for Significant NCRs1
ASSi.''iANT TO THE MANAGER OF OEOC (Quality '3 1 9and Nuclear Safetyl--for Significant NC~sMR T310 9 957DISTRIBUTE AFTER THIS SIGNATURE______________________
HANDCARRY COPY TO NEB -IsLS MD CESO OR. L. Brehmi, W8D195 C-K MD CESO O
- -, .~. -- ....... ... '-..-.. -''-c.-.-. * r t..,~..*t A LA I, (JLL tJtALdLVLCJ A 4UtL
PROC IUREMENT REQUEST FORM PR No. W- 353 11 R _______
PROJECT WATTS R4 NUL LF/N
B R E N C E : EN DES-EP 5.20 Date __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
C'ACTI VITY NO. LDZI8151- 1E3f-13y F7.1 Section Supervisor Ext 39Y 48'Originator C5. C. PSHP d Ext -3? P (e
1. Descriptive Title: U ~ iXEL,AY ,; , ,p
AdditionalDescriptionIf Needed
Equipment LocationA. Building or Area: 1) 1 L)L 98Y C. Column Lines: iS'~ 19l rB. Elevation: 7 7~ D. System: -P13
2. Attachment(s): -11 ILL0F AA A LE RJAL (Y SAM 7.61
.3 Procuremen~t item number(s): FP`1JJJ I= 1 -11 1P-1 II"P I [ 1 1 1% complete: lab A
RO/AW activity No.
4. Construction item number(s): E eL -l 3 1 3S ;I5. ECN number(s): 3 33'6 (A) ANS Safety Class A/ ~(B) TVA Quality Group NA11
~) ASME Section I II Class N / .(D) IEEE Class FC. F. Braun CONST Specification No.___________________________
7. Standards and/or codes: N/8. Seismic required: Yes .... kZ. No Category9. Identical or similar item and/or material was purchased on contract
No. 7 9C~-5-8 YYI- File No,.____ Project W/YATTS8 RML"; R4I10. (Scheduled dates from CPM dated _______)Scheduled Expected
a. Procurement Request issue dateb. Requisition issue date (date released to PURCH) _______
C. Award of contractd. Submittal of technical data*________e. Delivery to site (enter need date if unscheduled) Start _______
Complete ______11. (a) Quality Assurance required: Yes.J4No ___ Part 21 Required: Yes N No __(b) QA requirement reviewed by 7-7/3-L.6 i'
-12. Design bases verified by i &•2~
13. Shipping destination: Plant site I/ Vendor -____ Other___________________14. Remarks: FA CNYP ('61,955 15 RE4W J IN ORIDE T40 PP.EVA=,T DLA
() F NST 'urp A II TAs E BY- UNIT 1 ;Erf9RT-U;F CN15. Vcr,16JP RI2T~ oA~~ AfAI uRP WIr rp6 7- I- p)NR A . /54C
roject Authorization 7. 91 W. 0. Number ______Suborder Number __________
& N.3 ~.~5 30- 00-37Z*List (as attachment) specific technical information and date required from vendor in order to continueand to complete TVA design.
TO:
FROM:
DATE:
SUBJECT:
WM4R:LBcc(Attachment): MEDS, E4B337 C-K &
R. J. Ogle, W6C126 C-K
J. C. Standifei
Accession No.
PROCUREMENT OF ITEMS AND/OR MATERIALS FOR
EJA. We acknowledge this procurementrequest. Expected performance Remarksdates are as we have indicated.
LII B. This PR is being returned perthe remarks section.
Requisitioning Branch Assigned
cc(Attachment): MEDS, E4B37 C-K
TVA 10606 (EN DES 4.80)
Branch Chief
PROCUREMENT REQUEST FORM
SVIP '82 112 ý6Accession No._____
F. W. Chandler-, Chief, Electrical Engineering Support BranchW126
J. C. Standifer, Project Manager, Sequoyah/Watts Bar Design Projects,204 GB-K
November 22, 1982
PROCUREMENT OF ITEMS AND/OR MATERIALS FOR WAATTS BAR NUCLEAR PLAI
Please take the necessary action to procure the item(s) and/or material perattached procurement request (PR No. W-3534 ). Please returnwithin 10 working days a copy of the procurement request form to me withthe requested information on item 10.
F-J This PR is unscheduled.
FJ1 This PR is behind schedule.
j This PR is for an Emrergency Purchase (see item 14 on the PR form)
FZ-J This PR is scheduled.
f~Input data sheet is attached.
-Check asrequired:
~-y9
TO:
FROM:
DATE:
SUBJECT:
Check one:
TLNNESSEE VALLEY AUTHORITY- OIVISION OF ENGINEERING DESIGN
CO 0 k7 A ~
ORn flEI wLASSM DESCRIPTION OVANTITY UNITS MARK NO.kqlnN CA ION _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ ____ _____
RELAY, TIME DELAY-, 480V AC OR 250V DC MXVOLTAGE.120V AC OPERATING COIL, 4P DT, PAINEL NOUNlT, TIMERANl-GE 2 t~o 20 SECONDS, ACASTAT TYPE 701/iAC, OREQUAL. EOUITIPENT TO BE.11MOUINTED 11N1 TFE-FOLLOWINGCOMHPARTME-NTS OF THE REACTOR NOV BIT WiIICU1 WASORIGINALLY PURCHASED 0O4 TVA CONTRACT 74C0-F4646.
1A2-AIB2-B2A-A2B2-B
COl-lPTCOMPTCmPT"COIIPT
F.RP-2
I I I I I I I Z.F.C.TRTCAI. BILL OF MATERIAL'PROJECT _LATT.S P-AR ?`! TCTJ~AP P!.A4`
z I1-:ECTPJ CAL LOUT t"11N1T
______._______________..______________ IOV P,"AC.FOR MOV P.!)
DWG NO. 4;9
0 33/. DTE ~hOEKNOXVILLE TENN DATE
Eck NO DAE W D Ct4KDlsplW~ l~ I S~P UB- I tcdIAPPR SNis" o I 'lo -- ,r.-n~
FORM 3
WATTS BAR NTUCLEAR ?LANTINDEPENDENT EEV=.4
10520DIN521210520.92.0000ref: 10520DIN4254
Finding Number I F / 1 / 1 / 4/
R-PL
Coimments pertinent to finding:
45W760-3-3- and -4 were revised to agree with 47B601-3- series. All action iscomplete.
Attached is copy of ECN 3334,
Program Team Membert/T/F
Date
'Date
tlz/ 1L2Date
OEDC Program Manager
I,,,- ý &A u,4-Chairman, OIDC Policy Committee
Black & Veatch
Classification: type Category 14-
Black & Veatch Senior Review Team Chairman
,zh- 4 3Date
Date
IV
ENGINEERING CHANGE NOTICECOVER SHEET SWP 630120
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDI VISION OF ENGINEERING DESIGN
To: Construction Project Manager
ECNNo.. 3 33 14
Wafts Bar Nuc~.ar Ri.at, 2flCiy1
From: Design Project Manager
DATE JAN 201983
SWP 204 GB-K
Was U Analysis Required: Yes - No-L--.
eg ARLAS if. P15/9ss
/1
Prepared by
Project EngineerReleased:
SCOPE
Proect WAZZ-2 SO h/PR NCLE19RL MIR)J
System or Feature V AR) 0 S Y!5T~rm _Affected Unit(s) I£
NCR t'k-swP 8:k.C.7Reference & Description Chnge R'EVISED SCREMATIC AND ePANdEeTI PE~A MISS' 76l.~
;&C1)AGRE W& f& )IARAM 125 eRQ- IN7RMN SET'F REP:
DRAWINGS 0; 1 LVED:
WCi fE CTI DSIG GOOPS
MectgiEl
FOSSIL. NV~OR & S1PECIAL P20JECTS DESIGN
SPECIAL. DESIGN PROJECTS
AKOalTECTU~a. SUPPORT BRANCH
R4YSOCAL WORK MUST BE OON4E BEFORE:-
Pre-Op I st Fuel I %ThrmlTest Loadt POww
Yes Date Branchor Data SheetNo Available
APL _
No _
NOi
Oper'n Iefueli
Unit S)
CC (Attacnnme.1): ? b .1 yes-' 5
CHIEF. AEOIITECTNIAL SUPPORT BRANCH. wuaii C-6 miCaiF CVI LGIECIE SLCK. W9D226 C-S cuti
CHIEF . EL;CTRICAL E NEII~UCG $03Ca. Mact"* C-a "AsCSliF: PECHAmiCAI. ENGINEERING BRANCH. W7Cl24C- PLAAaiMr. *iUCLEA ENGINEER. W10CIZ6 C-11NECliEF . OUALiTY ASSURANCE SNAECII. 5100 NIBI-S
ENGINEERING SUP"" INANCOEVApproval Required
ECN isanch review:
~sign Pejec f _ at
Approved;
13 CIVIL On.CHIK
MIAE33NS~iU Clm 11s D-a-te
Chief Nuclear Engineer Date
.Yes or NoRequired for PSAR or FSAR AISRequired for Preoperational Test: At) b
If Yes, Test No.______
Vendor Backcharges InvolvedSeismic Analysis Required-m AVNonconformance Report RequiredQA Applies YSecurity System ModifiedVendor(s) involved: Z1ht
-VEP-'83 0-6-2'5-nEF. COST PLANNING AND CONTROL STAFF. V1204 C-9E. SPECIAL DESIGN PROJECT:. CY20224 C-SAGL* OF COI3TMJ CTIO0S. 7024 C-9
B 531 C-ERSITID11SiP31163 EB
Date
M = = = = = ýý
TENIESL VALLEY AUJTHORITZ.tVtS10-4 OF ENmGiNEE:RING OutI 3N ENGINEERING CHANGE NO
DATA SHEET NO.-1 ar Nudear Fktvj, -z r-p iy~]P
ý)esitn Project Manager T,1 rjkz
VIcE No. 33 'BRANCH 6 ~
Released By: A'0.9"ignProject Manager
iýepr-nv Secion MEDS AcCeSsion No. M~ -c-cession No.E E2 RR
r-eparec0ZeqRES C.FISHER -SwP 8 0120 501~ ________
TtlPages(RO): (Ra RSWp W8 0314 53 0RSection 5 _ _ _ __ _ _ _
Staff Eq. orRRtV/te.- YA 2 6
CI ief: !ateSCOPE
PrjectA2r WIQTT hiRveLgfl PL~ojr Affected Units 12..Ssem orFeature VY' R) QQ S SYS7EMS
Reference &uescription of Change REVISEfL SII-A I ~AND L¶QNYfECJr/ DR1aWlA16-
TO PAIREE WITH L061d DIf4IRAMS ON-VaR100LS XASTRUMEAJT SET7)N6.REF : BLA~CK t VErc7P F)NDWC 2IS E13F2 5 F)2~ to Ell FA~OI
Pl~q;Jell]
S EE ASSOCIATED DRAWINGS LIST, REVERSE SIDER~v. OGATE IPRE- SECT. GROUP BAIHECN O.P. DSRPINORESONTOTAL
PIC. ISSUPED PAREDI SUPV. HEAD CHIEF CLERK MGR. OECITOO EIINPAGES
I 3-P9"?iLE~b AA -14XLLL Dette 4 c /Z D.% i4pv x Z
t iats as ____________
-z _ __ _1Ow~_ __ __ _ __ __ _ __ __ _ __ __ _ __ __ _ __ _
-_)Z Z ZZPANNGA01Z Z____________ -9PLITSUERNTNDNa _____________ AC ITE-1A 9V ITIl" I,1416C9O SRCINPOETKN
_________.__C3 _ W IE1 11EN2 a IIW92 C1E0. 516 C-
.. E . V nlTR e AL S ENG TEMR 11 TAN F. VC1267 C-11 M11043 6441CSETUDCA
ili F . SP-I&L UC2ESIG r.EC TS V20C*W 229 C-9 ES 56 -
TENNESSEE VALLEY AUM4ORITV ENGINEERING CHANGE NOTICE No. 3 33 LiDIVISION OF ENGINEERING DESIGN. DATA SHEET NO. I.......
[AFF~ECTED OWO E ISSUE DATE UALUNIT__ DRAWING OR B/M NUMBER REV. EPECTED I TUAL REMARKS
is ~ I ~ ~I ~-q-2?
I~AGEj
12.2 L45J 762 71 -
J,2- L)5W760-2-35~ _z_ -
Z LS W62 L2N~OC-3-- 5- - si r
Z- ...... 4!2-7n0-33 .3.. <-I - - -I~R i. Q117
12 a q5NOO7 1----I
1..LZ? 145NL,0 -3 -p MA - - -7-
12.2. 4 A 00~o -' -3 - PE -ia -- 31 74
L15-A 6~,00o-g7-3 Y--~~________
J~~q.N1 N00O-37-8--g
~~ ~46NA60O-'I7-7 1
122 95NtQ0-~Ji-4, 37 3--9
_45- -A--
'TVA 20575E (EN DES7-779)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 3.3~3q
DATA SHEET NO. I.
~*1* 1
DRAWING OR BfM NUMBER
I ISSUE DATEIDWGI REV. IEXPECTED IACTUAL~1.
R EMA RKS
D -el4e.
-9 a/ -- -!2 -
L~~2 -463-11O--I V3 I2 S _ _ _ __ _ _ _ _ _
I42 4ISW'V76 0=3 -11- 2 ~ 95 76,-0-3~ '7 2L
L Y. )A -h74-0-- -7 1.3-2-8I-31_ _ __ _ __ _ __
L... '14582 742- 2A L_ _ _ _ _ _ _ _ _
1 L W737---/ 0_ _ _ __ _ _
11 11 1elA.
I L 5 7 .60 3 i2 21 3 3-1-93 _ _ _ _ _ _ _ _ _
-qSW712 (y 2 L
L '15BZ-zý , 0 _ _ _ __ _ _ _ _
I LI-sBZI741-~O 0 _ _ __ _ _ __ _ _
~~. SAJ600-S7*Z..O_ __ _ _ __ _ _
W&I60 7 -- 7- 2___it___3_ __-1_
LtSW6oo0 S7 31~Ji
no 1-7 3~ Dele4e--T - r -i------ 1 I-
4LPj 6 0 - 2- I. "'-I r-7 3-143
PAGE iýINE UPDATED
n DTA SHEET2Rv. NO.
li CA.) (o 0 0 2-
qrtj -6 6 a -'6 -"L 3LfS'ov6OO -7
-? 1 q. 4QLýA 9 ý - S= - ir-- 1 -9 1 A q 11 -
TVA 10575E (EN DES-7-79)
TENNESSEE VALLEY AUTHORITYDIV ISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. ,3L
1 DATA SHEET NO. )
nDAWSI~Jt~ AD R/M NIIJMRFR
ISSUE DATE
EXPECTED IACTUAL
q,,5ý,g 7 4 2-43
12- 2 YSW740-30-27
.7
7, 7 - -'7'
7'
UNIT DRAWING OR BIM NUMBER
,:7-
k.FFECTED
PAGE
F:1.I-
R EMAR KS
0-
FORM 3
WATTS BAR NUCL EAR ?LIJA-TNDEPENDEN'T R-LV-"#
10520DIN509010520.92.0000ref: 10520DIN3914
Finding Number /IF /ill/ /5
R-PL
Comments pertinent to finding:
The 62X relay coil was disconnected and the relay was shown as a spare onECN 3650. Drawings revised and issued for this finding are: 45W751-4 R12,45W751-10 Rll, 45W760-3-3 R3, 45W760-3-4 R3, 45B1767-2A R7, and 45Bl769-2A R7All correcti~ve action is complete.
References: ECN 3650 and NCR WBNSWP8267 RI
Note: This finding is identical to Finding F803.
Program Team Member
OEDC Program Manager
Date
'Date
Black & Veatch 4/
Classification: type_____________
Black & Veatch Senior Review Team Chairman
0--,4- ;100 p~r~4~~
Category __________
Date
Date
,oc 803
ENGINEERING CHANGE NOTICECOVER SHEET swm
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN as rNu;:.,3i CyT
'83 0120ECN NO. 36•0,S
To: Construction Project ManagerSWP 204 GB-K
From. Design Project Manager
DATE JAN 2 0 1983 8%4-d +CA .1-1: Z2 11
Was 1.1 Analysis Required: yes -Noje's
ifHdRI~LES e~. 1tJs HER
Ll Project EngineerReleased:
SCOPE
Project &B IT-6 R1AR- N~d LERR -LAVY
System or Feature' (-3) A x)LiiR aF'LEDWZIATEg sY-S TIC
Section L~
______ I-I -/J'
lanager Date
Affected Unit(s) ______
M 14CIZ WA&W Sua9 62V7
Reference & Description of Change CORRECe-Z DRAWIPJdS PER SLAeX I VEA=?H
Date BranchData SheetAvailable
Electrical E2Mech
YES-
ENuINEERING SUPPeRT 6m*RusXEApproval Required
ECNr a~nch review:tZ_ if_8
Zeic ro jet a~ager at
Approved.
E9S CIVIL IN. CustEr Date
INS ELCTRIC all. cauit '- l Date
itZ~Chidf Nuclear Engineer Date
FOSSIL. OVOID A SPECIAL PROJECTS DESIGN
SPECIAL. DESIGN PROJECTS
AMMINTEC79RAL SUPPORT BEANICO
WBP '83 0 826.PYIAWORK MUST BE DONE 8EOE
Test Load Power
539
Ooer~n IRefuetIunittst) 1 I 9- I I I
I:: uflit(s)
CC ~~y~(C IEF AR2ITC AL SUPPOR1T BRANCH. W4C126 C-I
C"IEF. CIVIL EIGI EERlog DRAMNC, W902219 C-9CHIEF. ELECTR:CAL ENGINEERIUG BRANCH, WC126 C-9cm IEF. NECIIAA CAL ENGINEMING $RANCH. V7C124 C-KN IEF . NUCLEAR ENGINEER, UlOC126 Cr-1
CHIEF. QUALITY ASSURANCE IRANCII. 5100 1I11
Required for PSAR or FSARRequured for Preoperational Test:
- If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report RequiredQA Applies2 Security System ModifiedVendor(s) involved: ______
-j
Yes or %o 1
NO0
& 0
CNIEF, COST PLANNING AND CONTROL STAFF. WIACTO C-9CRIEF. SPECIAL DESIGN PROJECTS. W211224 C-9KANAGER OF CINISTIUCTION. 17524 C-9PLANT SUPERIRTEROEATWEDS. USU3 C-6
*TENNECSSEE VALLEY AUT14OR I0IVIS-0N OFý ENGINEERING oEst
To.
Preparnsg SectionE 2.
Staff Eng. orArch itect.: /1/A
rY ~ENGINEERING CHANGE NOTICE NO. 3(GP4~..* ~ DATASk~ O
'roject manager SWVP 204 GB-K
PrepareaBy:e rtA'gLs ". F)-5H&R~Total Pages (RO): K ?SectionSupervisor: $ik'..-./4v~724 4
Released By-
SWP '83v 012 0SWP '83l 021454R
. i9
SWr 13 0308 R2ZI
8fkANC(L1W
PAGE 0
91 $77ýý -nProject Manager
MES ccession No-
[Chief: 73t
oject WA&125 BaR NU?!LEA/ PLACE ~OP Affected Units
ystem or Feature () V )IA YFEFT)WAZMI sysr-UdReference &Descrption ofChange (CQRECITDR:Wl~4 PE-R I3L~Ai~ gL. VFa:1Cd
diceFIA)DIN4S El : F80 3; Re5Mý E841*0, F III FIVIA 1ý ELP)2 F)22.' F/22;
IS26 9SB3
--- ýSEE ýASSOýCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUP RANCHI ECN D.P. TOTAL~NO. ISSUED PARED SUPV. HEAD CEF CLER MOR. ESRPONORVSONPAGES
I 1"Y ~ e~ Fe, 9A- l.9 Ifl11 D&Lgrgl) 2-DW&S e ADD,5D S5D~3 :W-9 / -. -1, iY o PE LEO rL- 0 /W6S
Reqn. No- -NI- -___________________________F * uesasfoliows NO PR REý'D
A Information:
CIICF. CCTS PLANINIG "0 CONTUOL STAFF. W12C1S C-K PI.UT SM11TSISENOENTNIEF, AIRCITECTURAL SUPPORT suitAN. WaCzz6 C-8 COISRUSCTION PROJECT MNAG~ER
OIIEF. C3VIL ENGINEERING IRABCN.WSS0224 C-9 NED MS96 C-OCNIF. D.LLTICAL ENGINEERING SEANCN. W*C126 C-9 A043: 648 CST2-CtsIEV. SPSCIAL DESIGN PROJECTS. W20229 C-K
I I X iccess on No.
R52514
TENNESIE VALLEY AUTHORITYDIVISIONt OF ENGINEERING OESIGN.
ENGINEERING CHANGE NOTICE NO. 36-605DATA SHEET NO. IL.
AFFECTEOISSUE OATE
UNIT DRAWING OR WMI NUMBER REV £XPECTED I ACTUAL REMARK~S
2-JI~ ~
PAGE
LLA2(2&2 ,,a~ .2-.5 - Pli~F. Q31I.. "''
_____________D 3- _Z -D 7-5
p Lj5WI75g-(. 2 .;.g -'~ I i
12 5 77IIfA -4
Ae L: 15WI7O&3
L'5w -76- H----
2- -67----r--
______ ~ ~ ~ ~ ~ *- -_____________ to___
______q_ S1__________________ ____________ _____________________
Fla. %Q 1-
-:-
I- ~ -, ~.A-~--' -
DIVISION OF ENGINNONCON FORMAI
EERING DESIGNXiE REPORT
MEDS Acccsson No. SVkr 982 1 2 2 1 0 1 9
IDREPORT NO. WBNSWP8 267
TJATT~ RAR N1TCL~AR PLANT 131UNIT 1
PREPARER/ORGANIZATION/DATE J. D. Collins/SWP/Decemlber 21, 1982
SDESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater system as a
result of the Black and Veatch third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, Pill, F114, F1U5, F116,F117, P123, P124, F127, P130, F131, F141, F802, F803, F804, F805, P806
Approximately 24 drawings have been identified with minor discrepancies.
06DATE OF OCCURRENCE EST ( X). ACT. ( ) 1978Fj] METHOD OF DISCOVERY- Third-Party Review
SIGNIFICANT CONDITION ADVERSE TO OUALITVYES C3 NO N
T gg&COOF(ENODES-EPS8.011 blf [1 8RANCH CHIEF/DATE 7P2 1 =21 fL.
:TIVE ACTION:
i ~CTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REOUIREMENT YES NO N ]
14 DE IGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
104i ECN REQUIRED El Y'tS -NUO LCNNO SCHEDULE IMPACT ElP 0A 0N
/ - SC()?E OF C 'STIM.AT
A.'ATTS BAP. N UCL EAR PLAN,,T EC NO.~
S~SEMFE~T~:(3.) flL2XIL)AR.Y FEEDWATE ? $YSTENAl
b-<irievisions by this section will not require addizicnal-=aterial
- /.Revisions by this section will* require additional materials as listed below
- 1 JRequestedUnit 1 Unit 2 Procured By R. coqntr Delivery._ eakitem _ __ Qty Qt__ (EM_ DI - /OýT ________ Date__ *1 _____ i __ __
_ __ _ _ _ I __ _ I _ _ _ __
____cic __ __ __I _ -I__
DIVSION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
WBP '83M-FDSAcc-sonN'6. ____
I REPORT NO.V'BNSW-r82b7 R!
UATTc ~ \'llrn ~P PT A\TT
PRiEPARER/ORGANIZATION/DATE J. D. Collins/WBP/AUuSt 17, 1983
DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schE-7atic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch'third party independent review. The Black
and Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, F111, F114, F115, F116,
F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
DATE OF OCCURRENCE EST ( X), ACT.( 1978 [~SIGNIFICANT CONDITION ADVERSE TO QUALITY
7; -- HOD OF DISCOVERY Third Party Review BR N H HEFD T
J * DE(EN DES-EP 8.01) L RNC CHE/AT _
_1 CORRECTIVE ACTION: The minor electrical drawing discrepancies identified by Black 'and Veatch
have been corrected on the following ECNs and FCRs:
*F123, F124FiP10, F102, F103, F104, F106, F107, F114,F11l, F115, F117, F127, F141, F803, F806-F105, F805
F 110, F116, F802, F804
F130, F131
2 C TIVE ACTION DEVIATES F
71 DESIGN CRITERIA DOCUM EN~T NO.
ROM A DESIGN CRITERIA REQUIREMENT YES E
41ECN REQUIRED ES YES NOD7 ECNNC 2316, 3647, 3650 1175 SCHEDULE IMPACT 7-1 F It N
0818 o1O
I [7 UNIT 1
E CNNECNKINFCRFCR
281636473650E3458E3508
NO 9
EXCEPTION REQUEST NO,
TjArrýrC VAV \1710T ",-.D V7 AMT
NONCONFORMNC.NE HEEPORT-
67~
ýiý',S~IGNABLE CAUSE: IREOUIRED IF SIGNIFICANT)
I~THIS IS A GENERIC CONDITION YES [3 NO [
ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
,jý- INDEPENDENT REVIEW:
I2~LABOR EST.(X), ACT. 20 MH C2:1i SCHEDULE EST. X).AC7. ) Ao
2!ACTIVITY NO. *See Below L23 TASK DESCRIPTION F2 DATE INITIATED *See Be!
25REMARKS.: ECN 2816 - Act. No. DZ85-E281669 Date 11/29/82
EON 3647 - Act. 'No. DZ85-E-364725 Date 01/17/83
ECN 3650 - Act. No. DZS5-E3650R6 Date 01/28/83
This NCR supersedes NCR WBNSWP8267 RO.
121DISTRIBUTION: 26ALL EN DES ACTION COMPLETE:CONST PROJECT MANAGER J .Clis 10MBK L
EN DES PROJECT MANAGERJ.DColn,50 BKtCHIEF. ESSOFFICE OF OA_______________N EB (for Significant NCRs)'*?.MEDS cis BRANCH CHI /ORG.
NSRS (for Significant NCRs)A~SSISTANT TO THE MANAGER OF OEDC (Quality WBP t8o 0 18 05
and Nuclear Safety) --for Significant NCRs
DISTRIBUTE AFTER THIS SIGNATURE w____0818_________050____HANDCARRY COPY TO NEB-NLS IMEDS ACCESSION NO.
10520DIN500510520.92.0000
WATTS BAR'NUCLEAR ?L-U7TINDEPENDENT REVTZ.'J
ref: 10520DIN4255
Finding Number /F /1 /1 /6/
R-PL
Comments pertinent to finding:
This error was also detected during the final wiring verification test No. 6-61.EN DES was notified by CONST via the existing Field Change Request procedure.
The connection diagram (45B1769-2A R7) was revise d and issued and the wiringwas correctly installed per FCR E-3508. All corrective action is complete.
References: FCR E-3508NCR WBNSWP8267 Rl
Note. This finding is identical to Finding F802.
Program Team Member
r- V&OEDC Program M.anager
Date
"Da te
Date~hirma n, OEDC P licy Coimnittee
Black & Veatch 6er-4- ,-/ac.".- 4AV
Classification: type Category /57z
Black~ & Veat&Ti Seni or Review Team Chairman
111eA
Date
12- kA, 3Date
FORM 3
I4zezl-ý
Am, i 0.-1
REPLY ~'c~RA::DLy. i .I- C ý - -- ,*ýý
c. tnndi rer, Sc~quoyah and Wotts Bar Design Projects Mannagr, 04C- (3
t C ntr :,a~cwicz, Project Manager, Wacts Bar N~uclear Plan.t CO. 51
- *7 32Ž.Roop , 1-.3..18 C-K
- P:~ :C4'ST
sItatus Poin:
X Pricr to Fuel Loading
After Fuel Loading but, nrior
to Closing Capitalized AccountsCc'nstruct icn
Syster -o. 3Vork Package 'No. N/AW2ork ?Ian 11o. -____
Aee~itional T'esirgnin forz t on
:-'t - frected
After Closin, Capit,,'-dAccounts for thi. Entire Plant
v V
45B1767-2A R6, -2B R6; £45B17691-2A R.6, -23 R7; 4 .w1767-4, R9, 45111769-4 R11
2oi D~ W4A'ZOL 4fZ 4 - 61ilbl~ 2 E. o, 4 D.17CL 7 6 KY
7r>,--. -ci~c~ equired and atcached Y
,-x" .scn required
.*,.*r- sr i Cr Clarifv the attached drawings to reflect the narked changes. _
7t cclucfL~eC bV:
Pt7. ~prc*.edbv:
.-7-.-"vi oht.,ineci by:
E. E. Burroughs,Jr
(CONST Znginee7)
Charles Fisher
(E!,: DES Fngineer)
X Telephone
12-3-82(Da te)
*..uIfor tr-ýnsmittal to FN DES:SW~ 83 0 1 7 1 0 * Const{c [ion Engineer) Pro cct -.un <er)-% 17i ' -
* D~~~ate Issuee Z~? -
ng os: 4L_-j74.7-2A 97; 4'5117A7-)AR77 _-tf-' i~~~-
(F: P.T~S Ei~gineer) ( 1 ~nPrOjcct 1 V-,naper) (~c
I P' luri to (CONST by r.' DE~SVv 't:,n-i by COiNST tirt i I nr: gi naf I 1 retitrneel
- 'Ie by O~f
or-C') n .
C r e
DIVISION OF ENGINEERING DESIGN 70- NONCONFORMANCE REPORT
MEDS AccessionWNBP '83 081 8 0 50
.0REPORT NO. IABNSUTP8267 R
PLANT WATTS BAR 1%UEFAR PLANTr1 3 UNIT1
PREPARER/ORGANIZATIONIDATE J. D. Collins/WBP/August 17, 1983
DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, Fl11, F114, F115, F116,F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
- Approximately 24 drawings have been identified with minor discrepancies.
DATE OF OCCURRENCE EST I X). ACT. 1 1978 SIGNIFICANT CONDITION ADVERSE TO QUALITY
7ý1NýOD OF DISCOVERY Third Party Review YSC N
(EN DESEP 8.01 -. __BRANCH CHI EFIDATE ~Lf/
2jCORiRECTIVE ACTION: The minor electrical drawing discrepancie's identified by Black and Veatchhave been corrected on the following ECNs and FCRs:
ECN 2816 - F123, F124ECN 3647 - Flbi, F102, F103, F104, F106, F107, F114, F130, F131ECN 3650 - Fill, F115, F117, F127, F141, F803, F806FCR E3458 - F105, F805FCR E3508 - F110, F116, F802, F804
i2C TIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NO
ID DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
D4ECN REQUIRED D YES NOQ3 ECNNO 2816, 3647, 3650 1H SCHEDULEIMPACT CP A N
NONCONFORMANCE REPORTW7 REPORT NO. WBNS
76ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
EDTHIS ISA GENERIC CONDITION YES [3 NOC[
.18 ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANTI
119 KNO%'EPENDENT REVIEW:
1127 LABOR EST. ( X). ACT. 1 20 MH SCHEDULE EST. X). ACT.(
ACIIYN.*See Below a TASK DESCRIPTION EN DATE INITIATED *Sj[25REMARKS: *EON 2816 - Act. No. DZ85-E281669 Date 11/29/82
ECN 3647 - Act. `Nd. DZ85-E364725 Date 01/17/83ECN 3650 - Act. No. DZ85-E3650R6 Date 01/28/83
Thais NCR supersedes NCR WBNSWP8267 RO.
COST PROJECT MANAGER J. D.. Collins, 5100 H1!3-K 2- ALL EN DES ACTION COMPLETE:
-N DES PROJEECT MANAGERCHIEF. ____
OFFICE OF QA
W!EDS CIS RNHCIýOG
!-.SRS (for Significnxi NCRs)ASISTANT TO THE MANAGER OF OEDC (QualityadNuclear Sal ety)-for Significant NCRs WBP '8r88 O
-rSTRlBUTE AFTER THIS-SIGNATURE 83____0818______ 0.0__i-ANOZAR.RY COPY TO-.NEB-.LS' MEDS ACCESSION NO.
10520DIN500610520.92.0000
WATTS BAR* NUCIZ-AR ~4INDEPENDENT R.E.V=
ref: 10520DIN4256
Finding Number IF /1 /1 /7/
R-PL
Comments pertinent to finding:
Wire No. 3AR was shownswitch l-HS-3-179A/B.corrected per ECN 3650complete.'
References:
as being connected to the green light associated withThe wire No. should have been 3AG. This error wason drawing 45W1769-5 R4. All corrective action is
ECN 3650NCR WBNSWP8267 Rl
Note: This finding is identical to Finding F806.
LO, Program Team Member
OEDC Program Manager
(4/Date
zl744ld;.rDate
Black & Veatch 7"-"- acw01,4;--
Classification: type Category A9
Date
Brack & Veatch Senior Review Team Chaixrman-
FORM 3
~#:-.* ~ ENGINEERING CHANGE NOTICECOVER SHEET sw
(BEFORE ISSUANCE OF OPERATING LICE ZSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN V'~sBr!uorPa~,SnyCl~I
'83 0120 *j
ECN NO.2 0~
To: Construction Project Manager
From: Design Project Manager
DATE JAN 2 01983
SWP 204 GB-K
Was IJ Analysis Required:
Project Engineer
- ~t*.Yes No V
SWP
Released:
SE2~~
-Design Pripject Manager
SCOPE
o:Project-WA-11=5 BAE NUCI.E12? PaAJT_ A
System or Feature. (3) P91XIL)/ RY LEDI'VTER SYSTEM
Section Loides'
Date
NCR WAN~ 5,tM 6247
Reference & Description of Change CtORREe 7- DRA~W/N6f S PER ELAC LX VEA e&w ow e',
El QND)A FIEUSQ1FN 'XiF11 15'J0q4F)7'F2
pjF 1_2A 'r-I TPi~r/ PA-45SDRAWMNGS'OR' B/M'S INVO e
.Dt Se(Data Sheets Requi
-C
Elctical E EMew
SPCA ALi ROET
1141 IA*. POIE IUCT GR OUP SEO
Date BranchData SheetAvailable
1-14.ENGINEERING SUPPORT mmANCRcSApproval Required
ECN; anch review:
10sgn Project Maager Dt
Approved;~~.
E13 CIVIL U3. CNIEZ Date
ESS LECNC61.__ i__W__ We
LOS RECN*HU ma. CNIE Date
Chidt Nuclear Engineer Date
Required for PSAIR or FSARRequired f or Preoperational Test:
If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report RequiredQA AppliesSecurity System Modified
Yesor %4
N 0
I 1- ' ~ I 1 Vendor(s) involved:
CC (Att&C.@'-.)
* CI. CMitTECTUIJA SPPr T ONANCH, W40I26 C-9 CHIEF. COST PLANNING AND CONTROL Si&'F. hsZC7aCC:IEF. CIVL EEG1 EE IUNG AS&CII, W9DZ2 C-k CHIEF. SPECIAL DEISGN PROJECTS. WZ0?2ZZ*CHIEF. ELECTRICAL ENGINEERING 82*3CM. VOC126 C-K HIA AER ft CBTUCI 11 C-ACu :EF. HECHANICAL ENGIREERING ORAIC", 10C126 C-9 PtIT SU ItU.9ECLIETco rF *uCLA taiot(.L wIc:12& (-8 NL. WM;-L
6wyv4 4rv,, Z: VI~*
A
vr.twTENsSE VALLEY AUTHOR?'DIVISION OF ENGINEERING OESI
-~ ENGINEERING CHANGE NOTICE NO.3 •\/Ni Bzr,&r §T'[t PPT NO.
Staff Eng. orArchitect: #V/A RISWV
JRU4X1~62- 6~,-. -
Released B3y:Design IProject Manager SWP 204 C'BXJAN z 1 0983
Dreparing SectionE21
PreparedB y: /-* IRL A _ 'A. F)iSH-c'
Total Pages CR0): )Z Z ISection -Supervisor: ( 1/ (~2.
5251.4
91
pe gn Project Manager
-. -,~r ---~ 5,~L~ flL.C))S.U 5.. I .W*LJ. flI,.3.))*uS Nol.
.RSWP '83 0120-4 I-I
,I8WP- V 0214 544
[Grou -II_______ __Head: 7 L13Branch IChief:
SCOPEProject WATTS APQR Nad LLHA? R ahNT Affected Units 1
System or Feature (3 4UYILL41?y Y FEFD WA, TeR S Vs rem
Reference &Description ofCh ange r-ORRPI.T- DRAWIN6 PER B3LACK I. VPY4TifH6100
F11JIND 4S PAW-. &~~ oFu J•Ff7F7' ~ .
JI Z
pF05 z
4. S
'~26'l&
- SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE* SECT. GROUP BRANCH ECN D.P. DECITO 3 EIINTOTALNO. ISSUED PA RED SUPV. HEAD -CHIEF CLERK MGR. OECITOO EIINPAGES
Z_/f-e S_ N - D61trg't 2 Dw(,S 1.DD,6Z SDp.v51 3--- _Jý DFt61j& '2PCý
kter-iais as follows: NO FIR REý'.DA~IRal Information:
CNIC?* COST PLANNIGu AND CONTROL STAFF. WISC74 C-9. PLANT SIIPEISIIIDZTcLip, AICIIITECTURAL SUPPOIT 14AMCN, Wellse 6 COOS.TRUCTION CPNOJECT MNAUSGZ
NIBEF. CIVIL ENGINEERING DRARCN.VW9922 C-9 NIRMS, 640A C3TI-Of II?. ELECTRICAL ENCINZENING S1*1CMI WSC12 C-4 RS 5 SZCVICU. FPICIA DE f&X "RJ _T3. V10224 C-1
91
BRANCH %A
PACE
ENGINEERING CHANGE NOTICE NO. 3(050DATA SHEET NO. IL.
IAFFECTEDI fw I W ISSUE DATE REAKUNIT DRAWING OR DIM NUMBER REV. 4EXPECTED jACTUAL 4RMRCLI rt~, t AA.. ~.. ~
PAG4IE
W-51. ~9
5 NL(6.60 H-h3 OO-3 3 -1 -4
J4 i 11 oI n*D Lo 1 DEL4E
.. LZ. L5w75)- 12?~ -- 2.-'9-,3 _ _ _ _ _ _ _ _ _ _ _
1,L ____I_______ -I - I QZ 9S
I HS*. B 'I W7(o7- Lj A71- - LF__
- 5 14-1 - -/ 2- 9-
J* L4W174'9-5 1/ - - 2-9423 _ _ _ _ _ _ _ _ _ _ _ _
'1SW1761-2 (a.-
12j ___SW_ __ _ LZ. - -- I- _ _ _ _ _ _ _ _ _
)Z~ Z 16Wi740-3- 3 -7
Li 5224__ __7-2_- - --
: 33-1 R
- T
:TENN-CSSEE VALLEY AUTHORITY"Dl:I;ONOP%.6 ENGINEERING DESIGN-
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
MEDS Accession NYB '83 0818 050
F ID REPORT NO. VTBN SVP8 267 R
WAIA=S BAR bUCTLE-kR PLANTr I 3;UNIT 1lPREPARER/ORGAN~IZATION/DATE J. D. Collins/WBP/August 17, 1983JDESOCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, Fi10, Fill, F114, F115, F116,F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
- Approximately 24 drawings have been identified with minor discrepancies.
DATE 0OF OCCURRENCE EST ( X). ACT. I J1978
.. =4DOF DiscoVERY Third Party Review -YES LI] No 0 I
DE(EN DES-EP 8.01) 11-1i1 *BRANCH CHIEF/DATE ~1j
11CORRECTIVE ACTION: The minor electrical drawing discrepancies identified by Black and Veatchhave been corrected on the following ECNs and FCRs:
2816 M 13,3647 - 161,3650 -FiL,
E3458 - F-105,E3508 - F110,
F124F102,F115,F805F116,
21 C TIVEACTIN DEVIATES FRC
-1 DESIN CRITERIA DOCUMENT NO0
F103, F104, F106, F107, F114,F117, F127, F141, F803, F806
F130, F131
F802, F804
)M A DESIGN CRITERIA REQUIREMENT YES 1
ECN REQUIRED ES YES NOQ1 ECN NO. 2816, 3647, 3650 SCHEDULEIMPACT P [DA DN
I PLA%-
ECN
ECNFCRFCR
NO 9
EXCEPTION REQUEST NO
NONCONFORMANCE REPORT .7.
W1 REPORT NO. i
176 AMIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
THIS IS A.GENERIC CONDITION YES NOC
18ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
INDEPENDENT REVIEW:
LABOR EST. ( X), ACT. 1 20 MN 2 SCHEDULE EST. IX). ACT.
f22ACTIVITY NO. *See Below 23TASK DESCRIPTION EN DATE INITIATED
F25ý REMARKS: *ECN 2816*- Act. No. DZ85-E281669 Date 11/29/82ECN 3647 - Act. 'No. DZ85-E364725 Date 01/17/83ECN 3650 - Act. No. DZ85-E3650R6 Date 01/28/83
Th is NCR supersedes NCR WBNSWP8267 RO.
F27DISTRIBUTION:FRALENDSCTOCMPT:CONST PROJECT MANAGER J. D..Collins, 5100 MIB-K ALENDSCTOCMPT:
1EN DES PROJECT MANAGER~CHIEF, ESB
OFFICE OF QAJNEB (for Significant NCRs)"-MEDS CIS bAC H /R
NSRS (for Significant NCRs)ASSISTANT TO THE MANAGER OF OEDC (Quality W P '3 0 1
and Nuclear Safety) -for Significant NCRs&3 0 1 0*DISTRIBUTE AFTER THIS-SIGNATURE _______________
HANDCAR.RY COPY TO`-NEB~mL:S7 MEDS ACCESSION NO.
FORM 3 10520DIN514710520.92.0000ref: 10520DIN3526
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number IF /1 1 /9/
Comments pertinent to finding:There was a typographical error in the FSAR. This has been corrected.Commitment trackin7 record CTR-WBN-R187 is attached.
/ 1i44Program/rfeam Member
OtDC Program Manager
Chaiman 00 Policy Committee
Dae
Date
Date
Black & Veatch -A
Classification: Type Category _________
Black & Veatch Senior Review Team Chairman
IP3/&Date
/2-15-/'Date
,f 79~
TVA 10618 (EN DES-10-81)
1 RESPONSIBLEORGAN IZATION
COMMITMENT TRACKING RECORD
6COMIMITMENT TITLE ý:, - 1 ---'X _ -ý--2._
7 SAR TECHNICAL 8 NLS 9 COMMITMENTRESPONSIBILITY RESPONSIBILITY LOCATION
<KN!~~~ t0 FI~e f c+4
10 TRANSMITTAL RECORD f FROM-TO-DATE (MEDS NO.)] - FOR NLS USE ONLY
3051_ 9/4
11 EXPLANATION
(WA~~~~~ f 6r ~ •~ 4 ~-
'831017 312 FýESOLUTION (FILL OUT ONLY AT CLOSURE) le1/ -, , 7e '--
n'x-f_,-4 fc r_ 4; -(,-s
DOCUMENT OR SYSTEM TRACKING DATEOR CLOSING COMMITMENT: [DOCISYS: ENTERED:
(STATUS AND INSTRUCTIONS-OVER)
r.VA 107%3 faMOCS.10401
UNITED STATES GOVERNMENT
Memorandum TENNESSEE VALLEY AUTHORITY
TO L. M. 4ills, 4anager of Nuclear Lizensirng, 40O C~E 82'05 2 2 64
FROM John A. Raulaton, Chief, Nuclear Engineering Support 3ranch',WIOC126 C-K
DATE MAY ? 1983 A830608KOM9
SUmiecr Jf-Aa.24 Ak."". Al'. 4 - FSAR REVISION PACKAGE N0. j7
Attached is FSA.R Revision Package 4o. 1'7_. The package containsapproved OEDC design input in accordance with ANSI ~445.2.11 forincorporation into the TSAR. As such, the material should not bechanged substantially without the prior written approval of YEB-WFLS.
If you have any questions on this matter, contact tL..
at exttenhsion 12L*
cc: 'fDS W5363 C-K, .#,al' 3ttacrhwe. s except ~~s
Principally prepared by &A-- LC--.t.... extension ,,
DE05;FSAR.R
Buy U.S. Savings Bondi Regularly on the Payroll Savings Plan
Izr)
L
WBNP-4"2
040.26 Question(8.3)
The Watts Bar design does not bypass the thermal overload
protective devices for electric motors onl safety related
motor-operated valves. Therefore, state the degree of
conformance of your design to the recommendations
contained in Regulatory Position C(2) of Regulatory Guide
1.106, "Thermal Overload Protection for Electric Motors
on Motor-Operated Valves."
Response
The Watts Bar design has. been changed to conform with
Regulatory Position C(I ) of Regulatory Guide 1.106.
pos~fsee. C4i
is Laed ;z I
61 Re ,1041fy
001.026-1
+k.~ UOt
FORM 3
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
10520DIN5 10410520.92.0000ref: 10520DIN4075
Finding Number /F /1 /2 /0
R-PL
Comments pertinent to finding:
These discrepancies did exist. These were identified. to EN DES previously byNUC PR using an existing program. The following drawings were revised andissued under ECN 2946 to correct these errors: 45W751-4 R12, 45W751-10 R11945W760-3-3 R7, 45W760-3-4 R7, 45W760-3-5 R5, 45B1767-2A R7, 45B1767-2B R7,45W1767-4 R10, 45B1769-2A R7, 45B1769-2B R8, 45B1769-3A R6, 45B1769-3B R6,45W1769-4 R12, 45NP751-2-1 Rl, 45NP751-2-6 R2,-45NP751-2-14 R2, 45NP751-4-1 Rl,45NP751-4-5 R3, 45NP751-4-6 Rl, 45NP751-4-12 Rl, 45NP751-4-13 R2, 45NP751-2-7 Rl,45N600-57-5 R3. All corrective action is complete.
Reference: ECN 2946
Program Team Member
OEDC Program Manager
Chairman,ký2OEDC Policy Committei
Date 8
/Date
Date
Black & Veatch
Classification:
___ ~
type Category 13
Black & Veatch Senior Review Team Chairman
Date
Date'
07.,
ENGINEERING CHANGE NOTICECOVER SHEET SWP '210
(BEFORE ISSUANCE OF OPERATING LICENSE)W
TENNESSEE VALLEY AUTHORITY ECN NO.~,,DIVISION OF ENGINEERING DESIGN
To: Construction Project Manager WtsBrNd~Fw1 2J2 n~ WSW 204_____________
From: Design Project Manager W 20GB1
DATEL] ~U ~1982
Was IJ Analysis Required: Yes No
CR6 U- ._nJSAER J_ _ _ __ _ _ _
Prepared b o eal*1-
1~ I' /,4-" ?Z~C44.~ Released:Project Engineer I! esgn roec
SCOPE .pae7
Project &ATTS BangR NUCLEaR PLANJT Affected Unit(s) L
SSystem or Feature AQX)L)A9Y FEE/) W,4 TER S Y5TEM (.1)
7ý-1,ýReference & Description of Change rCORREC T 1/AL VF5 NOMENCLATURE DFSC2?E)P L7 J.
JUSL~DENTIFIED BY SLA'CK AND VEA-rcH fINaakN6 REP6gRT.SRF.- FINDlING N Wof B ES Pr )Z' 0 L F8O.~-fc 6ef?*•0)
(I DRAWINGS OR B/M S INVOLVED: Yes Date Branch
(Daa Seet Reuird)or Data Sheet 14ERE UPRTssce e(Dt Shet Required)bl Approval Required
- ~ ECN is ready for branch review:
~ jI"~~W~ "'~"Design Project Manager
Elcrcl MAR 301 3 IM.Q Approved:
:;? nical ____________
Nuclear ND _____ EN3 CIVIL 8R. CHIEF Date
NULAt PROJECTS DESIGN GROUPSCivi113 ELECTRICAIN. m.CHgg Date
Eletrcal~ ________INES MECHANIICAL 91. CHIEF DateMech NO ____ _____________
Chief Nuclear Engineer Date
FSIL NITDRO & SPECIAL PROJECTS DESIGN s r~ .~ u 508 ~ o~
SPECIAL CE1GNC PROJECTS NO4 _____ eudPSA R or FSAR _______
ACTEUALSUPPORT BRANCO Required for Preoperational Test: _____________
If Yes. Test No.______Vendor Backcharges Involved NOSeismic Analysis Required 0
~4YICL WRKMUS B DOE EFOE:Nonconformance Report Required NPre-Op Ist Fuel 1%Therm Comml S A ple
Test Load Power 0OPernQ ApplieiSecurity System Modified _______
Vendor(s) involved: NO X
CC (Attachm~w.#i): Y es ~¶LCHIE F. ARCHITECTURAL SUPPORT BRANCH. VECIZG C-1 CHIEF. COST PLANNING AND CONTROL STAFF, W12C7o C-BCHIEF. CIVIL ENGINEERING BRANCH. W190226 C-9 CHIiEF. SPECIAL DESIGN PROJECTS. 5120224C-C:IiEF, ELECTRICAL ENGINEEqING BRANCH. W18C126 C-9 MANAGER OF CONSTRUCTION, E7224 C-KCHIEF. MECHANI"CAL ENGIR1'EENINGBRAC H,11*" V7C12 C-N PLANT SUPERINTENDENT
CHIEF. UICLE AN ENGIER OCZ C-R MEOS. W15663 C-9CHEF. QUALITY ASSURANCE BRANCH. 5100 M-NO
*TE7NE,5cF-E VALLEY AUTHORITY- ENGINEERING CHANGE NOTICE NO.01V (SICN . ENGINEERING DESIGN
To~~~ Watts Bar Nudw.. F AJ5WTNO4
Desin Pojec MaagerSWP204 B.~Released By-
BRANCHPAGE
esign Project Manager
Preparing Section MEDS Accession No. MED Accession No.
E 2~ R8 12 2 5 9R ________
Prepared0 0 120 194
Total Pages (R 0): (RZ VA '83 0121 524 5Section____________________ ________________ ___
Supervisor- RStaff Eng. or 2 6ýArchitect: A/Group A 4 R RHead: 1743 7Branch I ___________________ ___________________
Chief: Da teSCOPE
Project WATT.S BR~Q NULEt~gl EPL~AIT Affected Units £.ZSystem or Feature (3;) RL)XILIfRY FEEDWATER :5YST[F AReference & Description of Change C__ rARA'PiT YAV/fl)/' NOiME NC LA~TURE DE.Se-R) P7nU
A9S INDEN~TIFIED BY RLAek) rA)V YEATed FINDiNt& REPORT,
SEE ASSOCIATEDVOKER DRAING LIST REES SIDE
No No P~MR 3es e
CREV COSTE P RENIN SNECOTRO SITOUBANF. EICT N PL.PT DSCRIPTIRO N FREIINTOACNIO. RISSUEDTUPALE SUPPOR HEA D CH IE Id C LER K COSTUCI. PRAGTESNGE
CHIIF. ELCOTRICALN GING EE CNRING STARC F. WS12C7 C-1 PANTSUP6E0 INTENDEN
CH IEF. SPECI AL DES IGN P ROJ eCTS. W20224 C-K
TENNESSEE. VALLEY AUTHORITYOIVISc:'ON OP ENGINEERING DESIGN-
ENGINEERING CHANGE NOTICE NO,. .22Yti
DATA SHEET NO. Lj e PAGE E
Ti T LINEAF~CTEI DG ISUE DATE NDUNITj DRAWING OR B/M NUMBER REV. EXETDIATA REMARKS
'7 A
14zL Z AI W 751L Ll 1d,1-31-83 __ __ __ __ __ __ __
/ 2 1,5W75/- /0'_ _ _ _ _ _ _ _ _
12Z. 1 A5W7/,ojo -. . -_
'I 5B 171,7..q 2-2-8
2,5/B17 7-, 3A 5 --
I qI5RI717 -3B __ ___1_ ___5_
I . YL6WI7Z6-'l /0 2-q-
I LI5B 17/0~ 1-_ _ _ __ _ _ _
~L. q5yp 75) -2-1 _ _ _ _ _ _ _
/ '5MP761 -2 __ _ _ __ _ _
qL 5NP751- 4)-/ _ _ _ _ _ _ _ _ _ _
.L 15P~g~95 3I__ L)NP~gl )-9 )Z
____q5NP751---~)3j I--I q SAJ P71-2 -7 2-1~-932 'YSB2?67- -132 Ji5BZ716 7-2E -
26 2i 727?- 3 B ___ _ _ _ __ _ _ _ _ _
z. 15A?-74 9-28 _ _ _ _ __ _ _ _ _
ýI58276'9-3 __
_____ 751________ 4~ ~
I I
TVA 10575E (EN OES-1-79)
1TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
DRAWING OR DIM NUMBER
ENGINEERING CHANGE NOTICE NO.2q 4
DATA SHEET NO.L -U4
DWG I ISSUE DATE
REV. IEXPECTED IACTUAL REMARKS
PAGE
ILINE UPDATED
rN DATA SHEETREV. NO.
Z 415NP75*/-.( (- /3 f 1- 31-583 ''O
15 NP 751-67 a___-g
lYN P00 I- -13TIlE-4iL.00 3 1- 2~--'-3 AODD
FORM 3 10520DIN514810520,92.0000ref: 10520DIN4076
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F /1/ 2 / 1
Comments pertinent to finding:SFSAR revised stating that the SI signal is used for the accident signal
required by Regulatory Guide 1.106, position c(lb).
Corrective action completed.
Commitment tracking record CTR-WBN-R188 attached.
*TNVA's level 2 response stated that the issue would be discussed with theNRC staff, however since that response TVA decided that a revision to FSARQuestion 040.26 was the more appropriate way to obtain NRC approval of thedesign.
Program(Team Member
X 5D Prga anager
Cia rman, OEDC Polcy Committee
7 ate1-7,Z -
Date
Black & Veatch
Classification: Type Category 4
J O 18 VeathPoe ctmnaeBlack & Veatch Senior Review Team Chairman
V
I
Date
Date
TA118(NDS08)COMMITMENT TRACKING RECOR - Y~
I R~ESPONSIBLE 2 DATE 3 CHECKUP 4 DUE s IDENTIFICATbON W'ORGANIZATION FILED DATES DATE NUMBER;
10 TRANSMITTAL RECORD [FROM-TO-DATE WMEDS NOM1 - FOR NLS USE ONLY
:l' 12~ +, F7a2)4 /ý_g 364= .7 17)
pulcl 40 -%P
11 EXPLANATION
NB'831017 312 RESOLUTION (FILL OUT ONLY AT CLOSURE) 0 ~?''•* i- -
(4t l-'C ' f, -e *+7/.2 I ~ ?Lr I,-,
DOCUMENT OR SYSTEM TRACKING DATE/OR CLOSING COMMITMENT: [DOC/SYS: ETRD ,-g
(STATUS AND INSTRUCTIONS-OVER)
7 SAR TECHNICALRESPONSIBILITY
8 NLSRESPONSIBILITY
9 COMMITMENTLOCATION
E.6. agasle'7 i +o OSDC PIC~
F~iesAg 4eoC/ Apilqo') j
TVA 10,53 tFqCND(.I.501
LWITKD STATES GOVZRNIIENT
Memorandum TENNESSEE VALLEY AUTHORITY
TO : . 4. 11ills, 'Wanager of Nuclear Lizens-ing, 400 CS
From
DATE
SUNJECT:
A: -B '82)
John A. laulston, Ch~ief, Nuclear Engineering Support 3ranch,V10C126 C-K
MA\Y 2 1983 830608," a" -f J -4 - FSAR REVISION PACK'G A O
052ý- 264
K 009837A
Attached is FSARt Revision Package No. 1_1 The package containsapproved OEDC design input in accordance with ANSI ~445.2.11 forincorporation into the FSAR. As such, the material should not bechanged substantially without the prior written approval of YEB-NI.S.
If you have any questions on this matter, contact •-.-L& St-at extension 77
cc:S d5363C-K, i&a1 attachme. s except fi-.;re!s
Principally prepared by extension 7-1
D905;FSA.R.R
Buy U.S. Savingi Bondi Regularly ont the Payro~ll Savings Plan1~
.--
WBNP-42
Question
The Watts Bar design does not bypass the thermal overload
protective devices for electric motors on safety related
motor-operated valves. Therefore, state the degree of
conformance of your design to the recommendattiontscontained in Regulatory Position C(2) of Regulatory Guide
1.106, "Thermal Overload Protection for Electric Motors
on Motor-Operated Valves."
Response
The Watts Bar design has been changed to conform with
Regulatory Position W(O of Regulatory Guide 1.106.
A~eci~~C.%4 51 , 1d c .4
s i eL;d ;ý e
1*Re 4'%1
0410.26-1
*1
o~o .26(6.3)
+4%e
10520DIN500710520.92.0000
WATTS BAR' NUCLZ-AR ?AINDEPENDENi'T ---V=,J
ref: 105 20D1IN4 130
Finding Number / F/1 / 2 / 3/
R-PL
Comments pertinent to finding:
TVA drawing 45N600-3-4 was added to the list of schematic diagram referenceshown on drawing 45B640 Sh 147. All corrective action is complete.
Attached are-ECN 2816 (SWP 830131 502) (SW? 830131 503) and NCR WBNSWP8267 Rl(WBP 830818 051)
Program T~eam Member
QEDC Program Manager
at rman, OEDV .olicy Committee
11/71/F3Date
,11Z74orDate
Black & Veatch 7/ -Yc.'.Vrc 7 42.
Classification: type Category __________
Blac.k & Veatch Senior Review Team Chai-rar.
Date
Date
Fo~i 3
Zg7ENGINEERING CHANGE NOTICE
COVER SHEET Sr 12 5(BEFORE ISSUANCE OF OPERATING LICENSE)W
TENNESSEE VALLEY AUTHORiTY" ECN NO. .~I GDIVISION OF ENGINEERING DESIGN
*-o:Construction Project.Manager Watts Bar Nuclearj Plea±L 52rig Qy, ThA
From: Design Project Manager SW 20GB1
NAE.OV- 49 198Z G...;6Ae dew, -2a i
--- Was U Analysis Required: Yes - No
b-E.r-Lyf ..SLL)P e L Ect. _S E.__________________ Reeaed Section Section Leader
Project Engineer... Deign Project Manager Date
SCOt
Project 12rrq77 6A4R fh/(!LE-e P A. Affected Unit(s)J
System or Feature MINhl COAd7roeL -NI ._T 12 1AV f e' Wlt4 1 t Wa viTEIaa *' i .1 %* I&I %U6 %J111 I* 1V I
Reference & Description of Change ___________N _____S____T_____C____R,______&FT_____
P ZI r B/ULLNVO U 4 pte BranchShe.,*16IUEERnOC ISUPP08 SIACU~ES 7_- es a
labl - pproval Required --
ýE-CN4 is-ready-for ms. brnc eview: _
..C IV haa. Design___ Project Manager Dt
Egerctl Ln " ~~f# Approved:Mechanical- NO _____.-
Nuclear INS CIVIL St. cmitr Date
NUCLEAR PeJEC1S DESIGN G410 ENS ECicraticAL St. C DateCivil NO ____
Electrical £32 -00) 4M ____ ENS wcaeugc. St. CNizp Date
Mech _____
hief Nuclear Engineer Date
______ RequiredU Yes orNo
SPECIAL EInCsam P1JET _____Require for PSAR or FSAR- iv&
. ~ .... _______ Required for Preoperational Test - O -
ý .-- If YeTest No.- AJ
- - - *. . -. 4-iVendor Badccharges Involved Ai
Seismic Analysis Required AJlpPWYSICAL WORK MUST BE OONE BEFORE.1 Nonconformance Report Required J
Pre-op IstFuci 11ITherm Comm'I I AppieITest LoAd Power
6 oer'n Refuel QAecuritySste Moife
Uaatfs) Vendor(s) involved: DJ1N06
CC (Attacnm..cr%): .yest I OCAf ~I'L tdOEi
c:uUTECVR, SUPPORTma, a 2MCK Wuac 4 12i C-4 CISEF. CUT? "aI4 AND CONTRbOL $TAFT. vWLZ7 C-a -CCHIE[F. CVIL ENGINEERING SIANCHm. W9022 C-9 CHIE?, SPECIAL OECSIS PIOJECTS. W20224 C-9CHIEF. [LECTRICAL ENGINEERING gisACK. USZAC-I6 HAIIACC OF CONST~oCTIOR. E7224 C-9CHIEF. PECCNHCA ca~~Cgum el - PLANT SPERInTiMST
TV-NNESSEE VALLEY ALJTHORI1-f ENGINEERING CHANGE NOTICE NO. /CIDIVýISION OF ENGINEERING DESIGN DATA SHEET NO. S RANCH
To *f Vlais Bar Nucea Plrt piI rt,44 fFrPoet Manager ~p-,Released BY:
zTe a Me ign Project Manager
P'r .e.paring Szction MEDS Accession No. -MEDS Accession No.
Prepared 0 WP11 9 .By: bY- FLOVRVAO
Total Pages (RO): R. R5Section e~ 5'________________
Suvervsor~cV/ -
Staff Eng. or Rl/ R
Architect: 2~ 6t
Group ~~3 7
Brancth_ _ __ _ _ __ _ _ __ _ _ __ _ _
Chief: tateSCOPE
Project £.JA,477S A ~AIJ C~ I- EF,9? je &9H7T Affected Units -/-.2,
System or Feature X~411N 00 1Y TR L ^6AeR9O HW A10 /7- trr/,65
Reference & Description of Change r-k T ~ C ONY ~ ATERIALSOR C0q~f i-n rI
SEE4 ASOIAE DRWNSLITEERESD
REV. DATE PRE. SECT. GrOUP BRNHECN D.P.TOANO.' ISSUED 1PARED SUPV. HEAD. CHIEF CLERK MJGf. DESCRIPTION OF REVISION POALE
als as follows: NJ/14 -
Additional Information. N/A 4 / -CHIEF. COST PL.A11U BUG AND COITRoL STAFF. Wi2C7 C-z PLANT 'SPERINTENDENTCHIEF. ARCHITECTURAL SUPPORT 19a u, a rL2 ~C-.z CONSTIMCTIOR PROJECT mhEAGC3CHIEF. CIVIL ENGINEERUING 91AiCX.wqQZla C-9 NEDS. VIMN -CHIEF. ELECTRICAL ENGINEERING SEANCII. WC126 - ANN3* 444 C3TZ4
TENt4CSEE- VALLEY AUTHORITYD.Vi:ION OF ENGINEERING DESIGN.
ENG .INEERING-CHANGE NOTICE NO. -22(DATA SHEET NO.I
DRAWING OR a/M NUMBEROWG ISSUE DA~TEREV. IEXPECTED IACTUAL
4-5 a~ a 4 84o -5-#. 1 -14-83 J12I--l-2- moz 0ipnrc-
/#~~~. 4 -03r// -'3_ _ _ _ _
~4s.5-640 SAKS 14 1_ _ __ _
*'-.2 45, 9 ld 5-,*. Z9.j
S/# 4&c,~i ~.76---4 --
/#.a I-56 64d si~r. 7D __ _ _ _
SI 4SA'/634 ;5W,. /6,fI z-- __ _ _
.2 4-5A/.43e .5H. 49_ _ __ _ _ _
J 45a4o Sr, 8 141 __ý-qlaI bioýotru
-. ISN2 k-I S1..:.
~~~~~~~~~~ 45RE2ý- __ -"'40 ~ Pf
---------
PAGE E
REMARKSN1 EEA 0
TVA GA OCS B 4%)
..tITFI, D'STATES GOVERNXENT
Uernorandum
:Those listed
TENNESSEE VALLEY AUTHORITY
WBP '83 0818 051FROM -N. C. Standifer, Project Manager, Watts Bar Design Project, 204 GB-K
DATE AU G 18 1983S-UBJECT:WKITrS BAR NUCLEAR PLAN~T UNITS 1 AND 2 - NONCONFORMANCE REPORT WJBNSWP8267 Ri
1. My memorandum to Those listed dated August 10, 1983(WBP 830810 069)
2. NCR WBNSWP8267 (SW? 821221 019) (W-BP 830810 068)'
Attached is the revised completed subject NCR andCompletion Verification Sheet. Corrective actionF802, and F804 was incorrectly recorded as havingCorrective action for these findings was actually
Nonconformance Reportfor findings F110, F116,been done on EON 3650.done by FOR E3508.
J. D. Collins, 5100 MIB-KL. J. Cooney,.W6D224 C-KR. A. Costner, 14173 MIB-K
R14J:JGSAttachment
cc (Attachment):M'EDS, W5B63 C-KR. M4. Pierce, 104 ESTA-KM. N. Sprouse, Wl1A9 C-KR. D. Tolley, 210 GB-KG. Wadewitz, Watts Bar Nuclear CONST (3)
Principally Prepared By: W. M4. Roop, Jr., Extension 3434
References:
DIVISION OF ENGINEERING DESIGNN~ONCONFORMANCE REPORT
W BP '83Mt " D' A cc -s io n N 6. ___ _
PVINT IAS BAR NIJCLILIAR PLANT ___
ZPA/CAAN!.TIN/DTE J. D. Collins/'WBP/%4ugnst 17, 1-983
]DESCRIPTION OF CONDITION
E R EPOIRT NO.
UNIT
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater systam as aresult of the Black and Veatch' third party independent review. The Black
and Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, F111, F114, F115, F116,F117, P123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
DATE OF OCCURRENCE EST ( X). ACT. C 1978
-. 40DDOF DISCOVERY Third PartyN Review
D) CODE (EN DES-EP 8.01)
I SIGNIFICANT CONDITION ADVERSE TO QUALITYYES N 0NT )1
L, 0,1 -BRANCH CHIEF/DATE
COFRRECTIVE: ACTION: The minor electrical drawing discrepancies identified by Black adVeatch
7have been corrected on the following ECNs and FCRs:
2816 - F123, P12436447 - F1,01-, .10-2, F103, F104, F106, F-107, F114, P130, F1313650 F 111, F115, F117, P127, F141, F803, F806E31458 F 105, F805E3508 F 110, F116, F802, F804
0 318 050_
!I CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REOUIREMENT YES D NO
DESIGN CRITERIA DOCUMENT NO. ECPINROETN
bECNEOUIED F YES NODECNNo 2816, 3647, 3650 1,51, SCHEDULE IMPACT H HAT
NONCONFORMANCE REPORT~:D 2B~S~.TS267
I`jA'SIcNABLE CAUSE: IREGUIRED IF SIGNIFICANT)
THIS IS A GENERIC CON DITION YES NOD
ACTION REOUIRED TO PREVENT RECURRENCE: IREDUIRED IF SIGNIFICANT)
:a'INDEPENDENT REVIEW.:
H20:L-ABOR EST. ( X), ACT.11 20 MH 2 SCH ED UL L ET SlX A CT7 1 CA
1272 ACTIVITY NO. *SeBlw 273 TASK DESCRIPTION t 24 DATE INITIATED *See Belo.
12ý5 RE?.-APJ(S: ECN 2816 - Act. No. DZ85-E281669 Date 11/29/82ECN 3647 - Act. No. DZ85-E364725 Date 01/1-7/83,ECN 3650 - Act. No. DZ85-E3650R6 Date 01/28/83
This NCR supersedes NCR WBNSWP8267 RO.
F271 DISTRIBUTION:LALENDSCTOCMPT:CONST PROJECT MANAGER J. D..Collins, 5100 MIB-K 26ALENDSCTOCOPTE
;-)Q1 EN IDES PROJECT MANAGER'~CHIEF, ESE
OFFICE OF OA ______________
ES(for Significant NCRs)- II~JOGEDS cis BNCHI OG DATE
RS(for Significant NCRs)ASSISTANT TO THE MANAGER OF OEbC (Quality W P '3 0 1 5
and Nuclear Safety'--Ior Siunificant NCRs B 81 5DISTRIBUTE AFTER THIS SIGNATURE______________________HANDC'ARRY COPY TO NEE-NLS MD CESO O
105 20DIN500810520.92.0000
WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW ref: 10520DTN4131
Finding Number /F /1 /2 /4/
R-PL
Comments pertinent to finding:
TVA drawing 45N1638-5 was revised and issued to show the correct referencedrawing. All corrective action is complete.
Attached are-EGN 2816 (SWP' 830131 502)(WBP 830818 051).
Program Team Member
OEDC Program Manager
Chair nkn OEDC Po y Committee
(SWP 830131 503) and NCR WBPSWP8267 R1
1(/7/gr3Date
ZI714-3Date
'Date
Black & Veatch 7 . 7 ~ i. 4/-4 ~
Classification: type Category 001
e,2Bjfck,& Veatch Project Manager
Black & VethSenior Review Team Chairman
FORM 3
,,/q, j'Date
Date
7: :7
Was IJ Analysis Required: -.Yes
Prepar~dby
Project Enginee
NoV
Seetion
eleased:-. Design Project Man.
Scopf
Project W0977-5 00R )CI-E~r b A
System or Feature 4MA/A C0N7I-oL__ 1F117 19ZA-"*r.J?.5I
Reference & Description of Change
OR CUNSTI CHN I MAN-~HOURS
E.UgINLLUIUc SUPPORT af3RESCa.>, "
Mechanical .. O ____
N4ucear ____
NUCLEAR PROJECTS DESIGN GROUPS
Civil NOElectrical 6.3 *o-
Mech?-C
FOSSIL. INTO" A SPECIAL PfJEC1I DESIGN-
* SPECIAL DE3164 PROJECTS 'JO
ARO TK1IALSlPPm'~ 2~ 0 - --
unit(s)
CC CAttacnrn#ý*t%):-(9-.VI-
CHIEF. ARCH ITEC 8JAI. S4IPPOT SA~AK. wSC12d C-KC: IEF, C IVI L EDmOI.EERING 0211CI. V9O224 C-9CHIEF* ELECTRICAL ENGIElERING IKANCM, WOC126 C-9CHIEF, MECHANICCAL ENGINEERING BRANCH. VYCI262 C-11
ENGINEERING =PPO~rT SRANOICS - .Yes ao
ApprovaRequre:.
..- .- CVLo. wer Date
ENS ELCTICAL lit. CHIEF Date
ENS MLECHANICAL at. CHIEF Date
hiet Nuclear EnierDate
Required for PSAR or FSAR Ye&2 NRequired for Preoperational Test: No0
If Yes, Test No.'_______
Vendor Backcharges Involved _______
Seismic Analysis Required lNonconformance Report Required vQA Appises J. Aa-Security System ModifiedVendor(s) involved: AirlSN
A10N Ce.vr7- L.-AAC .'. 1 40li/q 4i
CNIEF. COST PLAIIIIINC AND CONTROL STAFF. VzZ1CyaCCMOEF. SPECIAL DESIGN PROJECTS. V20224 C-gMANAGER Of CONSTRUCTION. E7124 C-9PLANT SUPERINTIFABT
INOV 9 198ZDATE
ENGINEERING CHANGE NO TICOVER SHEET SWr
(BEFORE ISSUANCE OF OPERATING LICENSE)
ICE'82 1.1.2 9
ECN NO. -12 9 l.o
Section Leader
agar Date
ftected Unit(s) jj
TE NNESSEE VALLEY AUTHORI[TYDIVISION OF ENGINEERING DESIGN
T Io: Construction Project Manager Watts Bar Nuclear Plact, 5ritig Citf
- n~a.. ~SWP 204 GBX1
T'ýNNLSSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. .8iDATA SHEET NO. I
WaIts Bar Nucljft plant, SodnI2 r.b 1;MT4/100
BRANCH 5f
PAGE
Released By-
(~pI~ gn Project Manager
Preprin SecionMEDS Accession No. ~ -MEDS Acce~ssion No.
Prepared 0 1 29--50:1BY: b~- FLOU~IZ.t Cr __ ___:;_ __ ___,_
Total Paves CR0): . R -R
Section75.Supervisor R---'
Arachitect: fl,4 2 ý6
GroupRR
Chief: - ati_
SCOPEystem or Feature 1;,411/ CON 7-?d L 66e)9%eo V~.~r
Ref erence & Description of Change Im v A ! IV-" iMATEIRIL
BAI I
l ef
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE~FREV. DATE PRE. SECT. GRUPR.N4 E D .P.DECITOOFRVSNTTANO. ISSUED 1PARED SUPV. HEAD CHIEF CLERK MGR.DECPTOO RVSNTOA___ ______PAG ES
'I-. -~W~ als as follows: A11.4Additional Infnrm~t;,.,. ,,iIO SWP '83 0231 503CHIEF, COST PLAMISIC LAR COTO16L STjAff. j1ZC7R, C-9 PLAIT SWPERINENIDENTf-VIEF. AMNSTECTUR&L 31101eEwT IaUaM vaeus C-9 MRSTRCTIO. PIOJCT MAUAGL99IC34,F CITIL CECIGILRING SRIUC*.Vv*DZZX C-9 NWDS. V5163 C-gCHIEF. ELECTRICAL ENGSEEuu Cug 1SkICM WC126 C- -Aftis. 646 CSTZ-C
=KZ7.Mesi Pr Jectmapager
1`7@V zoý Igg . SM, a 4
TENNESt,'EF VALLEY AUTHORITYDEVMSON OP ENdGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. c'( ~DATA SHEET NO. I -
DRAWING OR B/M NUMBER
~Lf /
OWG ISSUE DATEREV. IEXPECTED IACTUAL
I-i4-~ I 12-I -V2* - 4 ...../t.J.C7 . ~'fl .....L.... ~ -~- '
L4V~J~ A IRE 1J ~ p --
14#o2 458?4-4d (3_ _ __ _ _
SIf~ ~ sw.S14 -
he.. 4-5664-6 s.7C H -3 -
1*. 2 *#SB3,4da -5. 7P4r
S/ I4-SN163d 9d./ L9-~_____
14_V24 ,0 Ad 16.__ _
1K. 458r.4~6 Si 1l.84
L .-- 4 c sN 3r-54 /- 4- kaPwIi 1/r cA Th9Oc
* ~4SNJ ~~ _ _ _ _ _ _ _ _ _
AFFECTEDUNIT
PACE ElI
I I-i REMARKS r
, ~ V
'rWA -64 '40ý."t)
',-t'-ITED STATES GOVERN31ENT
eo-randurn
bern:Those listed
107,TENNESSEE VALLEY AUTHORITY
WBP .'83 0818 051FR OM ,,-J. C. Standifer, Project Manager, Watts Bar Design Project, 204 GB-K
DATE AU G 18 1983SUtBJECT:WAITS BAR NUCLEAR PLANT UNITS 1 AND 2 - NONCONFORMANCE REPORT WBNSWP'8267 Ri
References: 1. My memorandum to Those listed dated August 10, 1983(WBP 830810 069)
2. NCR WBNSWP8267 (SWP 821221 019) (WBP 830810 068)
Attached is the revised completed subject NCR andCo~pletion Verification Sheet. Corrective actionF802, and F804 was incorrectly recorded as havingCorrective action for these findings was actually
Nonconformance Reportfor findings Fi10, F116,been done on ECN 3650.done by FCR E3508.
D. Collins, 5100 1413-KJ.* Cooney, W6D224 C-KA. Costner, M4173-MIB-K
'RMJ: JG,rwu Attachment
cc (Attachment):MEDS, W5B63 C-KR. M4. Pierce, 104 ESTA-KM4. N. Sprouse, WllA9 C-KR. D. Tolley, 210 GB-KG. Wadewitz, Watts Bar Nuclear CONST (3)
Principally Prepared By: W. M4. Roop, Jr., Extension 3434
- I
IQ*
DIVISION' OF EENGINEE~iNý' DESIGN 0NONCONFORMAANCE REPORT r05
E[DS Accf1-~sson N6 'b 01
REPORT NO. V
PiNT *yý:A''TTS BA-R NUCLEAR PLANT UNIT1
A-E R,1C F:'GA:,,I Z.AT ION/ DA TE J. D. ClisYB/ust17, 19833__
Di-C"jPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,
schle7atic, and connection drawings for the auxiliary foe-e&ýater system as a
result of the Black and Veatch'third party independe-nt review. The Black
and Veatch finding numnbers are:
Fl01, F102, F103, F104, F105, F106, F107, F110, F11l, F-14, F115, F116,
F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
DATE OF OCCURRENCE EST(X), XACT. ( ) 1978
-- HOD OF DISCOVERY Third Party Review
D1 . CODE (EN DES-EP 8.01)
09SIGNIFICANT CONDITION ADVERSE TO QUALITYYES 17 NO07ý
*1 BRANCH-CHIEF/DATE : x H1'6IICORRECTIVE ACTION: The minor electrical drawing discrepancies identified by Black and Vea
have been corrected on the following ECNs and FCRs:
F 123, F1124F101, F102, F103, F104,* P1ll, F115, F117, F127,-F105, F805F 110, F116, F802, F804
F106, F107, F114,F141, F803, F806
F130, F131
27CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT
;21! DESIGN CRITERIA DOCUMENT NO.
ECN-U:E C) YES NOD FCNNC 2816, 3647, 3650
YESj 1 NO~J
EXCEPTION REQUEST NO.
; 15!; SCHEDULE IMPACT flP
3650-
E3508
YES 17 NO K
NONCONFORMANCE REPORT
-!'-IGNABLE CAUSE. 'REQUIRED IF SICLNIFICA'NT)
117- THI!S IS A GENERIC CONDITION YES [ NO[D
118 ACT ION REQUIRED TO PREVENT RECURRENCE: IR.ECUIRED IF SIGNIFICANT)
Ki *INDE-'DENT REVIEW: 6I o:0 LASOR EST. (X1,ACT.I 20 MN 21 SCHEDULE EST. X). AC-T 3 [t-
;22' ACTIVITY NO. ISe Belo TASK DESCRIPTION F 24' DATE INITIATEC SeBi\
__5, RE?-'ARKS * ECN 2816 - Act. No. DZ85-E281669 Date 11/29/82E C,: 3647 - Act. 'No. DZ85-E364725 Da-e 01/17/83ECN 3650 - Act. No. DZ85-E3650R6 Date 01/28'/83
This NCR supersedes NCR WBNSWP.8267 R0.
1271 DISTRIBUTION: ALL EN DES ACTION COMPLETE:CONST PROJECT MANAGER J. D. Collins, 5100 MIB-K ý6
28 EN DES PROJECT MANAGERt nCHIEF, ESBOFFICE OF Q.A ______________
B (for Significant NCRs)' *AC DT-B I ANCH CH~I ORG. DT
RS (for Significant NCRs(SSISTANT TO THE MANAGER OF OEDC (Quality W P 83 0818 050and Nuclear Safety)--for Sionificant NCRs B
DISTRIBUTE AFT ER THIS SIGNATURE_____________________
HA~NDCARRY COPY TO NEB-NLS MEDS ACCESSION NO.
,ovq ,,-ýS
FORM{ 3
WATTS BAR' NUCLEAR PLANTZINDEPENDENT REVIEW
10520DIN509110520.92.0000ref: 10520DIN4360
Finding Number / F /1/ 2 /5/
R-PL
Comments pertinent to finding:
The interlock contacts from the time delay relays 74-A and 74-B shown on theschematic did not agree with the time delay range shown on the logic diagram.The exact time delay setting is determined during. preop testing, at which timethe required drawings are 'revised to document the actual time delay. Newrelays will be purchased with the time delay needed if existing equipmentwill not meet the requirements determined during preop testing. The drawings'which were revised and issued (per ECN 3334) to correct this discrepancy are:45N600-3-2 R4 and 45N600-57-22 R2. All corrective action is complete.
Attachments: ECN 3334 and NCR WBNEEB8301
01 Program Team Member
c ~ ' OEDC Program Manager
rman, OEDC licy Co_=nittee
Dte/ lS3
Date
B lack ðe. A.
Classification: type ,' Category !9
Black &VeathSno Review Team Chairman
Date
Date
10.'
ENGINEERING CHANGE NOTICECOVER SHEET SW? '8 0120
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
To: Construction Project Manager-
From: Design Project Manager
DATE JAN 2 01983
ECNNo.. 3331~4Wafts Bar Nuciaar F ~n ~y f
SWP 204 G&-I
6&Adjd( e* E' ..
Was IJ Analysis Required:
Prepared by
Project Engineer
Yes - No LJO
Projec WAr~ BP: &M UCLE19R PLAqNTSystem or Feature Y)OR)DV~sS ~Y r TIe-M N
Affected Unit(s) I,W 1 R ~8M. 11
Reference & Descroton.QLChange ffEVIsED ste!)4mATe AND) 00EC T)ONPl RAMNISSLO.A~R~F W) e D)MRAMS ~I VARIOUS 2WSTRUMENTSFTTiNiS~REFi
DRAWINGS 01 I LVED:
tri,
ouU Ci JECTIV IWGbOU
%EIedtgIE Il ElonýMec%6
FOSSIL, ilYDRO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS
ARCHITECTURAL SUPPORW INU*8W
FU3JI~s:F)2~,'P)3e- F80:F/g Fil-Yes Date Branchor Data SheetNo Available
ŽLQ~
PHYSICAL WO RK M UST BE 00N E B1E:O RE:-
Pre-Op 1st Fuel 1%Therm Comm'I lotTest Load Power Ooer'n Refuel
Unit(%) I IUnit(s)
Approval Required
ECN is anch review:
a~c g r er Dt
Approved:
ENS CI VIL SI. 1 at
ENS £LEC!U m7Cu
ENS 11AVaI CAL IN. oIiu Date-
dd'V7'duk A-I -7-Chief Nuclear'Engineer Date
Yes or NoRequired for PSAR or FSAR YESRequired for Preoperational Test: ?
If Yes, Test No. ________
Vendor Baclccharges InvolvedQSeismic Analysis Required&Nonconformance Report Required 62QA Applies Y9 5Security System Modified N 0Vendor(s) involved: N________________1
CC (Attacnrmei.-ts): - -r d 6) - - - - -
CHIEF. ARCHITECTUI&LSUPPORT SIANCW. WUC126 C-4 C11 I F.CH IEF, C IVi1L1 CIKUIU EtIN BANCH. W90224 C-9 CHIEF.CHIEF . ELECTRICAL ENGINEERING 9RANCHI. UlC1.2O MANAGAERCHIEF . MECHANICAL ENINiEERING s3*8W. V7cS.2i C-9 PLAN TSCHIEF . NUCLEAR ENGINEER. WIGCL26 C-4 NEDS$CHIEF, QUALITY ASSURANCE ORAM01. 9100 "1"-
WBP'83 0-6-2 V - 5tF8-C03T PLin SIN AID CONTROL STAFF. W12C?* C-9SPECIAL DE.SIGU PSOJECTS. W20224C-
Of COOSTSOCTIOB. E7524 C-9WPEuINTESETS163 C-4
AARPF W)19Rý'e DIA RAMS JV VAPIOUS TUrROMENT REP:
B164-N A NPVN
TENNESSEE VALLEY AUTHOR IT'OIVISPC44 OF ENGINEERING OESI(
To:
--Fri ýesiqn Project Manager S'A'D
ENGINEERING CHANGE NOTICE NO.___DATA SHEET NO. I........
10lBRANCH f]
PAGE LReleased By:
4ý,ýqnProject Manager
Preparing Section MEDS Accession No. MDAccession 0o.
Prepared 02 R W 4w 8 1 0 5 1 _ _ _ _ _ _ _
By:eCYZRLE3 !C. F)SHER '01 0 5Total PagesCRO):() RSWp "83 0314 530 ASection 1 __________________ ____________________
Supervisor: RStaff Eng. or OArchitect: ZY 1A 26Group RR
Branch__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________________ __
Chief: -a tSCOPE
Prjet W/4 7*rr BR RNUCL-EaR PLahJZ AffectedUnits
System or Feature W 'R I 2-9 SYS Em SReference & Description of C1hange REVISED) 8 C)4CLMdne- fiti CQV'NyZI:rzoN- Dg12WLJAr2
L2 MIREP WiTH LOwl: DIA&RAMdS 61V VA8RlbVA TNW5Z2R MEAJr .SFTT/Nd.REF: SLA'CK t -V~fi eP Fm1D- E)J 1)2~ -6 E)2 13 FAoi:
-4 ~ SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDEIKREV. DATE PRE- SECT. GROUPBRAJ14CH ECN D.P. TOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR. OSRPINORESONPAGES
13-N 4ab '-L 1, Ifv- 5 Deje4 e /7 Dwgs ti .p x
£LŽqn.No.W55 1~.z~jaisas follows:
A~WInformation:
CKILF. COST PLANNING AMD CONTIOL STAFF. W12C7A C-9 PLANT SUPERINTENDENTNIEF. ARCRITECTUI*L SUPPORT sumAN. Wc4eC-Z CONSTRUCTION PROJECT MNAGSAE
C1 I EF CIVI , ENGINEERING SBANCH.WWOD124 C-9 "ID3. S3663 C-9CvI EF. ELECTRICAL ENGINEERING mUSMCl. WOC126 C-9 ARMS. 640 CSTZ-CCOIIEF. SPEZIAL DE31GN PROJECTS. W2022 c-
I"( do-ft 0ý
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN._
ENGINEERING CHANGE NOTICE NO.. 3 3:3 14DATA SHEET NO. LI
UNIETE( DRAWING OR B/A NUMBER ~REV.EXPECTE ICTA REMARKS
I . a .J - a k21..A~-~ I ,-q..9?
122 H5AJ 72 1-
1LL. Z~~~o~- ___
,dmm 3#.3~~ _7
-- q
19-2 LISAI4,12- 3-~ J1
&i H5N),O- A ~ to - --~R~ j
_ _-. 2y 9N /p_
_1_-__7-_
19.2 )1 SN A0 0-3' - 3791.12__ ___4-9 ___Al___k_____ -
-7- 7
)~~.Z~ NrO½'-
_4!_ 4•5 O'i- &q - -A
J~7~H5NLOO-~78 ___LP
"7._______ IV__________________
PA66E
, .TVA 10-575E (EN C-ES-7-79)
7ENNESSEE VALLEY AUTHORITYDr'JJSION OF E%;-GINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 3 3-3qDATA SHEET NO...L.
O~tAWING OR B/M NUMEERDWG
ISSUE DATE PNE UPDATEDIO DTA SHEET
R EMA R KS
1%11
k~~- - - -
I I Z '45WA/74 3 -)l 33--3 _ _ _ _ _ _ _ _ _ _
I qI58) 7,-7- ZA 12 112 45 827479- 2 A
Z-~2~ q5W7SI-~' 10_ __ _ __
I -- d76- -3 0 -;a V e/le e.,H5W 6 --3 0- 23 3- 3 -2--f
L. 4 5817 7- 0-o
I '1qT-8-)7 9 -O 0 _ _ _ _ _ _ _ _ _
~ ~LISB/761.. I _ _ _ __ _ _ _ _
2 L5EZ247.02..
____ 'iSW-ocS7 -S-__ _ 4S-A)600-S7-Z?. 2- 370
L SW 6 06-r7- z, .1-2 --
49-AJ600-1. 3-143_ __ _ __ _
_ _ _ _ _ _ _ (Do _ _ _ _ _ _ _ _
# _ _ _ _ _ _ _ _ _ _ _ 3 _ _ _ _ _ _ _ _ _ _ _ _
4YEocp /
i~Z TEDj
loq
PAGE -3
REV EXPECTED FACTUAL IREV NO
DIVISION OF ENGINEERING DESIGN
' zNONCONFORMANCE REPORTIl
~~.V.: MEDS Accession No. RX '8.J2-..CF 12 2 1 71
ElREPORT NO. TW3NS
:2 PLANT WATTS BAR NUCLEAR PLANT 1 UNIT1
4]PREPARER/ORGANIZATIONIDATE J. D. Collins/SW1'/December 21, 1982
KJ DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,
schematic, and connection drawings for the auxiliary feedwater system as a
result of the Black and Veatch third parry independent review. The Black
and Veatch finding numbers are:
F101, F102, F103, F104, F105, P106, 7107, F110, F111, F114, P115,.P116,
F117, P123, P124, F127, P130, F131, F141., F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
63DATE OF OCCURRENCE EST(I X).ACT. 1978 SIGNIFICANT 'CONDITION ADVERSE TO QUALITY
7] METHOD OF DISCOVERY Third Party Review YES Q NO
UNIO CODE (EN DES-EP 8.01) i11 -BRANCH CHIEF/DATE ~ ~
I1 CORRECTIVE ACTION:
132 CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT NES NO
1]DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
__4 ECN REQUIRED 0Yis NUO LCNN() SCHEDULE IMPACT ElP A N
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
.. . ..........
...... ..........
. ... ........
/Z,-
REPORT NO. WBNEEB8301PLANT Watts Bar Nuclear Plant ýE3 UNýIIT Ilanndd?
There are no procedures for documenting time delay relay setting that are determined bypre-op tests.
61DATE 0- F OCCURRENCE EST (X ), ACT. (112/30/82 F7 SI GNI FICANT CON DITION AD, VE :;E TO QUALITYH~OD OrDISCOV YBlack & Veatch Finding F-126t YES [Z Nn)
S CODE (EN DES-EP 2.01)1L 01E BRANCH CHIEF/DAT,-~4~zz
ZCCIRRECTIV E ACTION:
A special engineering proce'&.-'re 421il be Written co,documenting the time delay relay settings. give thie procedure for
7V~__CTE ACTIONDCEVIATýESFROrviA DESIGN CRITERIA REQUIREMENT YES x_________;3' DESIGN CRI 7ERIA DOCUMENT NO.- EXCEPTION REQUJES7 No.4EC% REQUIRED YES E C 1751T SCHEDULE IMm'ACT LT~5
MEDS Accession No
NONCCNFORMANCE REFORT
ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
L SAT NO.
It was not recognized that a formal procedure was required to documnentzhe time delay relay settings.
1E7 THIS IS A GENERIC CONDITION YES NOD
ACTION PFCU>IRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
* Adl'herence to the special engineering procedure.
Adirective has been issued by the Manager of Engineering Des4.* instructing all design employees to become thoroughly fa-mili~ar :ithF and to follow all EPs.
:19 INDEPENDENT REVIEW: ~///,d- ___________20LABOR EST.(IAT(IMj
SCHEDULE EST.C I, ACT. IIDY
ACTIVITY NO. 23 TASK DESCRIPTION T INITIATED
2EREMARKS.
*This problem exists on BFN and SQN. NCRs have been written a-ddressing thisproblem for their plants. All WBN schematics have been reviewed. Thetime delay relay settings not currently specified have been identified inletter from J. C. Standifer to F. W. Chandler dated April 7, 1983 (WE? 830427022). A memorandum dated June 14, 1983 (EEB 830614 939), to those listed fromF. W. Chandler details the interim procedure for documenting the time delay* relay settings. Special Engineering Procedures SEP 83-11, issued October 1L4,*1983 (EEB 831014 937), gives the procedures for documenting the time delay relaysettings.
27DISTRIBUTION: 26j ALL EN DES ACTION COMPLETE:
CONST ROJECTMANAGECENDST PROJECT MANAGER
CHIEF, ESBOFFICE OF OANEB (for Significant NCRsP
RNHCI)1R.DTME DS CIS *BAC-H - IR.DTNSRS (for Significant NCRs)
-0~1f1ASSISTAjT TO THE MANAGER OF ODEC (Quality
'j'..-',.and Nuclear Safety).-for Significant NCRs I ,B92DISTRIBUTE AFTER THIS SIGNATURE
HANOCARRY COPY TO NEB 4kLS MECF3 ACCESSION NO.
R. L. 3rebri,. W8DI195 C-K
FORM 3 10520DIN509210520.92.0000ref: 10520DIN3547
WATTS BAR*NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F /1 /2 /6/
R-PL
Comments pertinent to finding:
The time delay range for relays lSG, 2SG, 3SG, and 4SG were added to drawings45N600-3-3 R3 and 45N600-3-4 R3 under ECN 3334. The exact setting will bedetermined during preop testing and added to the necessary drawings. Allcorrective action is complete.
References: ECN 3334 and NCR WBNEEB8301
Note: This finding is identical to Finding F801.
Program Team Member
~ OEDC Program Manager
Chaiz&a, OEDC PoV Committee
Date
6ate
Z4 161,9e
Black & Veatch
Classification: Type ___________
Black & Veatch Senior Review Team Chairman
L.~..Category i
Date
21/ 2)/i(h.hlate
ENGINEERING CHANGE NOTICECOVER SHEET SWP Im 01 20
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
To: Construction Project Manager
From: Design Project Manager
DATE JAN 2 0 1983
ECN NO. 3.S33)q
Wafts Bar Nuc.!Ga~ ?JYJ ~r!9cl
SWP 204 GB-I
Was IJ Analysis Required:
C.BARLA-S C. F)1//6RPrepared by
Project IW1QTTS &99R NUI!'LEAR ELPM1J
System or Feature VA ) VS.
Reference & DescrIPtlonj4~Ihange
A y -5 'rM AAffected Unit(s) t2
NICR WSAl-SW9 8:L.7~FV)SEb ~Th~MAT)C AND t',~N)/&~T)OW BRA W)Ne~S Th
Data SheetAvailable
Ei,E2.
FOSSIL. WORD0 A SPECIAL PROJECTS 09310
SPECIAL DESIUI PROJECTS
ARICAITECIURAL SUPPORT 53*C1C
WORK MUST BE DONE BEFORE-1
Pvc-Op Ist Fuel I%T~wharTest L-oad PowerI 0er~n IRefuell
Uniff I~ 2
EUS1UEERINS 3SUPPO RT SIIBMC E3 oApproval Required
ECN aich review:
ýeiqn P~jec M er Date
- Approved:
ENS CIVIL 3321 i
ENS MýNyiANICAi. U. CHIEF Date
Chief Nuclear'Engineer Date
Yes or NoRequired for PSAR or FSAR YE~SRequired for Preoperational Test: L4 0
-I fYes, Test No.Vendor Backcharges Involved 1Seismic Analysis RequiredNonconformance Report RequiredQA Applies ye 5I Security System Modified N ()Vendor(s) involved: N ON E
J
CC (AttaCnm..II):?.-~- xd7 (5/)CN: EF ARCMI TECTU3ML ESUPPORT BRANCH. WlIC126 C-9 CHIiEF. CO3T PLANINGR AND CONTROL STAFF. W12C74 C.4CIN E. Ci V1_ ENCI EESING SEARCH, W90224 C-K CHIEF. SPECIAL DESIGN PROJECTS. W20224 C-4CHIEF. ELECTRICAL ENGINEERING BRANCH. lilCilA C-9 MAUAGEE OF CONSTRUJCTION. E7924 C-KCNIEF, MECHANICAL ENGINEERING BRANCH. V7C126 C-4 "PLIANT SUIPERINTENDENTCHIIEF. NUCLEAR ENGINEER. W10C120 C-9 NED$. U5563C-CSIEF. F:QUALITY ASSIJESCE SEARCH. 5100 "1S"
Yes No I~f
R-cylsEp -qr- SmArm ND ehAtEe'rJOR R WAMA' 76
STENNESEE VALLEY AUTHORITrDIVISiON OF ENGINEERING OESIC
IainProject Manager &%t,!7
r= ) 4 10 A3.
iN ENGINEERINGý CHANGE NOlDATA SHEET NO...
-1 Li ýjL1
T-if~
riCE N O . 3 3 3 R AIJ No
-~ PGE 1
Released By- ) ' ~T-~.0-1.ssign Project Manager
Preparing Section MEDS Accession No. I MEDS Accession No.
Prepared R SWP '80 10 4By: ýYRES CFJ14ER -00 2 501 _________
Total Pages(RO):() R SWp W8 0314 530RSectionIS5Supervisor: R
Staf /gAo 2 6Group RRHead: 3 7Br-anch__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief: a eSCOPE
Poject W-nrr T R. BR NveLE R C PL a dJ7 Affected Units A.. *
System or Feature VilR)OI. SYT-EdmSReference Description of Change REV/ISED SCREMA2M:1T- AqND tCoNbl~crn'oA DRAW)AJ,2
ZQ Pa4REP W1ZH L06ed DIA&RAMS ON Vaglovu9 ZNISTRUMENVT SEr-rNd.REF: BLACeK t -V~req F)INDIWCS ;:)IS: FI2.5 F)1,/' FPIZ F.901l
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUP BRNHEC" D.P. DSRPINORESONTOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR. DSRPONFREIONPAGES
I ___ L?2Jb -// Z)4)S Dfettete /Z D-j lt42- x~' pjs
.Lqn. No. W --553Y
AdW w Information:
CNIEF. COST PLASUIVC AND CMTUL STAFF. W12C74 C-9 PLANT UPERINTENSUTCNI EF. ANRcIIZCTIORAL, SUPP04T SEASCI, VaCLUA C-. CONSTRUICTION P00JECT NANLC(3CNIEF. CIV"IL ENGINERING £ASACII.W012 C-9 c - 9 NEDS. 64G CST-CCNIEF . ELECTWICAL ucImumumo2, INA1cu. VIaas C- S.50 ST-CNIEF. SPECIAL DESIG PROJECTS. W29224 C-a
TENNESSE VALLEY AUTHORITYDIVISIOFE OP ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO.. 3 3:3A4DATA SHEET NO. LI..
AFFECT= 1w ISSUE DATELREAKUNIT DRAWING OR 13/M NUMBER RE.E~eTO ACTUAL EAK
T,,,r2-L-0-2! -2q 9
2L572 1-1 -7.
19z H5W760- 6!2- 1.
&g-? ll5W7/P0!Z7=L-
1dZ2 8i4S~ OOpp -!- 3 ~ I_ -
i2.2AJ~O-3•- ~ £ - - -I ps4R ýW Q 31. I-17Z
LL?~~~.. L1roO-3- 31 H7 -If~77 g3~4
12-2 q5N 1, QQ 3-7-8 - -
I IZ A15AO - 2. to - -q 7- __ _ __4__
lk 2 14S ~ O~- At A- Q. q. --
1L2.. z •A)A t5H7Z 66-- -V-7-
YSNA Yb-7-$ I
12LZ 34! P"AO~7 9_ __________
4 q:57 -
IZZ 9 DivN-9- __IMP
//7PAGE
,Th'A.210575E (EN DES-7-79)
TENNESSEE VALLEY AUTHORITYDr./iSION OF ENGINEERING DESIGN
ENGINEERING. CHANGE NOTICE No. .333qH
DATA SHEETNOI
j DRAWING OR S/IM NUMBER I
DWG I ISSUE DATE
REV. IEXPECTED IACTUAL4 1
R EMARKS
I4NE UPDATED~N DATA SHEET
Dle- 4e-
1 Z LSW7g - -1 -P (6__3-2 _3
-it 2-15 -- W Z6 0 -- -3 -,
IL q5W81 7 L 7-31 a I$±!1.51 (ai' 2-3 3q 3 128
N A 27 &7-2)9
i J 15WZSL 1 I______ eJeLc.
Ai 0 ?~-1- 2 3 3 ___2__ __43__
1 ___5__BM_ 0 1_ _ _ _ _ _ _ _
L. '158 17(,-7 -0 a_ _ _ _ _ _ _ _ _
1L125T376-1...oz 0 1_ _ _ _ _ _ _ _ _
____ 'S-NJ60 -S7- Z -3- 93j 3 -----------__ ___
____~~L 4J6 00 -7- Z 1. 2 _ _ _ _ _ _ _ _ _ _
Lfs- 6oo-2.-3 3_ _
Ws-J600 -7£39
PAGE
REMARKS EV NO
I I I I I IN-P-4-/ 9 ý - a I -- ]---3 -1 )q-,R I
. I
TVA 10575E (EN DES-7-79)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 333L11
-1 DATA SHEET NO. I PAG
A-
'/9
UNIT RAWIG ORB/M NMBER REV. ISSUE DATE 4CFFECTED DWG
UNT RWIG RB/ NMER RE.EXPECTED ACTUAL REMARKS WE
4 -6t( 3-N'-?3 -Z-?'3 _ _ _ _ _ _ _ _ _
-7 .
-~ DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT /-
- ~ MEDS Accession No. SWP '82 12 22 1 o 1 9
WREPORT NO. WBNSWP8267
2 PLANT WAT A wrfjUNIT1
r4 PREPAJRER/ORGANIZATIONIOATE J. D. CollinsfSWP/December 21, 1982
5DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,
schematic, and connection drawings for the auxiliary feedwater system as a
result of the Black and Veatch third party independent review. The Black
and Veatch finding Inumbers are:
F101, F102, P103, F104, F105, F106, F107, P110, P1.ll, F114, P115, F116,
P117, F12-3, F124, P127, F130, F131, F141, F802, F803, F804, P805, F806
Approximately 24 drawings have been identified with minor discrepancies.
06 DATE OF OCCURRENCE EST I X). ACT. 1 1978 []SIGNIFICANT. CONDITION ADVERSE TO OUALITY
[7] METHOD OF DISCOVERY Thuid Party Review YES 0 NON
DE (EN OES-EP 8.01) 110 -BRANCH CHIEF AE =
111CWECTIVE ACTION:
12 CIEATO EITSFO DESIGN CRITERIA REOUIREAMENT YES NoJ No
D13 DE-SIGN CRITERIA DGCUME_'JTNQECET..REUS O
[D4 ECN REQUIRED C3 -YS __ LCNNO SCHEDULE IUPACT P A 0 N
DIVISION OF ENGINE ERING DESIGNNONCONFORMANCE REPORT
................. ........................................
.............. ýEB 0'11
WREPORT NO. WBNEEB83012 jPLANT Watts Bar Nuclear Plant E3]UNIT 1 and 2
PREPARER/ORGANIZATIO"N/DATE W. T. Estes/EEEB ItC#3/1-14-83SDESCRIPTION OF CONDITION
There are no procedures for documenting time delay relay setting that are deter-mined bypre-op tests.
T DATE OF OCCURRENCE EST ( X ). ACT. I ) 1 2/30/82 ; 9=SIGNIFICANT CONDITION ADVERSE TO OUALITFYý7 ~ETH-D OP DISCOVERY Black & Veatch Finding F-126'YS N j3 j LAD CODE (EN DES-EP 8.01)L,0
JU~CORRECTIVE ACTION:
A special engineering proce'i.-*-re 421l be written to give the procedure, fordocumenting the time delay relay settings.
*CC-,:PECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA RED UIREMENT YESp:DESIGN CRITERIA DOCU-MENT NO.
EXCEPTION REQUEST NO,REOUIRD E] 'YES NUWZ LC'NNU 'ljj SCHEDULE IMPACT P 7 AX-
MEDS Accespi-n NI,
NONCONFOR[VANCEE REPORT-JRT NO.
ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
It was not recognized that a formal procedure was required to documentthe time delay relay settings.
17THIS IS A GENERIC CONDITION YES NOD
1181 ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
Adherence to the special engineering procedure.
A directive has been issued by the manager of Engineering Desigri,instructing all design employees to become thoroughly familiar ,.,ithand to follow all EPs.
.19;INOPENENTREVIEW: f 7/
ACTIVITY NO.D,.TINIAE
,SREMARKS
This problem exists on BFN and SQN. NCRs have been written addr-essing thisproblem for their plants. All 14BN schematics have been reviewed. TheA time delay relay settings not currently specified have b~een identified inletter from J. C. Standifer to F. W. Chandler dated April 7, 1983 (WBP 830427022). A memorandum dated June 14, 1983 (EEB 830614 939), to those listed fromF. W. Chandler details the interim procedure for documenting the time delayrelay settings. Special Engineering Procedures SEP 83-11, issued October .14,1983 (EEB 831014 937), gives the procedures for documenting the time delay relaysettings.
DISTRIBUTION:CONST PROJECT MANAGER
S EN DES PROJECT MANAGERCHIEF, ESBOFFICE OF QANCEB (for Significant NCRs)~MEDS CISNSRS (for Significant NCRs)
STANT TO THE MANAGER OF OEDC (Qualityd N~uc~ear Safety).4for Significant NCRs
WR IUTE AFTER THIS SIGNATURE0-N OCARRY COPY TO NEBN\LS
R. L. Brehm-, WSl) C-K
26ALL EN DES ACTION COMPLETE: 4IfIv"'I
'BRANCH CHIEF/ORG. DATE
MB '8310 19Q 97MEDS ACC:ESSION NO.
10520DIN500910520.92.0000
WATTS BAR*NUCLEAR PLANTINDEPENDENT REVIEW
ref: 10520DIN4257
Finding Number /F /1 /2 /7/
R-PL
Comments pertinent to finding:
This is a labeling error on 45N600-3-3 R2 and 45N600-3-4 R2. "LM" shown f orLM-3-164, LM-3-156, LM-3-l48, and LM-3-171 should have been "LGV." The errorwas corrected on 45N600-3-3 R3 and 45N600-3-4 R3 on ECN 3650. All correctiveaction is-complete.
ECN 3650NCR WBNSWP'8267 Rl
EACLG__- -Program Team Member
OEDC Program Manager
irman, OE6Policy Committee
/1? ?3Date
Dater
Date
Black & Veatch 7
Classification: type ___ __________Category_________
y Bla'k & Veatch Project Manager Date
Black & Veatch Senior Revie w Team Chairman Date
FORM 3
References:
ENGINEE-RING C"IHANGE NOTICLECOVER SHEETA I"
(BEFORE ISSUANCE OF OPERATING LICErVE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN Wall B-rN-. ;FL2 S.-Ciy ~
?U`3 0O12 02ECN NO.
To: Construction Project Manager
S\'VP 204 G3 K'From: Design Project Manager
DATE JN 018 ~ 3 ~ ~ j 4~ ZZ. 1
Was IJ Analysis Required:
6/HRRL,55 C. ZE15,AP .SWP F2 _ _
ie~on,2$ Section L;=,e'
1 Project EngineerReleased:
0 Design Project Manager
SCOPE
Project WiTT-5 8199 ~ i~~ PLqANT -ASystem or Feature (3) Re)XILIPRfY Ft*EIPV),qYER 5Y5T-FM
Date
ffected Unit(s) )2
)Y I!, GWP ( :7
Reference & Description of Change CQOR?-iý T DRAW~l/C if PER L/(N2VE7ThF/A)D~htcA
1 : P 4 . R X (3 * * -/~ ' 4-, . . . . .
(9 DRAWINS OR B/M'SINVOL~.\Q\.-(Data Sheets Requi
U~GIICLR 5 rý '.
F ~ ~ . i~anical (J~~j) Nuclesj-IC
IIý.VAl I EO IAGROUPS 12
Electrical E2-Meri
FOSSIL. HYDRO A SPECIAL PROJECTS DE3IGO
SPECIAL OESICII PROJECTS
ARCHITECTURAL SUPPORT BRANCH
140 '830826Pa-ySICAL W'ORKNIUsr BE DONrE BEFORE:
Fre-Og. 1st Fuel 11'Th~wm I
Test Loic Po~e,
Date Branch.Data SheetAvailable
yF5
539:ommn'i lt
I - -
tUGiISERING SUPPORT eRANCHES
Approval Required
Aesign Project Mla ager
Approved:
Nh
402
;eview:
Date
EN3 CIVIL 89. CHIEF
_ E11 ELECTRIý 3 . H C
NJ14Chidf Nuclear Engineer
Required for PSAR or FSARRequired for Preoperational Test:
- If Yes, Test No.
Vendor EBackcharges Involved
Seismic Analysis RequiredNonconformance Report Required] QA AppliesSecurity System Modified
Date
Date
Date
-7
AlD
Vendor(s) involved:
CHiIEF, COST Pt. "KING AXO CCUTIZOL STAFF. Vt2C74 C-,CHIEBF. '.PECIIL SESICI 1P*OJECIS. W70-1; C-KXARACERCF CCSMMTv~ON. L1GZ2 C-9PL'IT SPEiRIKIENDhT
No____
CC (Altacnmeýtq), y-~ >(171 -CH:iEF. ARCHITECTURDAL tUPPORT ORLI.C,. idRCI26 C-9C.-i EF. CIVIL. ENGIAEERI~r BRANCH. V90224 C-kC'I E F. EL.ECTRICAL ERIGIIEiqiiG BIARICi. h8C126 C-1CRIEF, XEChA41CA. EIGiuEECRII;eG IC4. .iCIS6 C-C
ENGINEERING CHANGE NOlDATA.SHEET NO.
J- ~ 'A -
Design Project Manager SWP '204 Cb-K
Preparing SectionE 21
Prepared
2y:,'-ydL5 4. F13HE'gTotal Pages (RO): aSectionSup~ervisor: xld,
Staff Eng/1/A
N1~.U~ MCLe~ICr1 I~SU.Ti N1~U~ ACCeSSIOn NO.
-1
ýSWP '83 0120 5SW t03 0214
riCE NO.--! 0. BRANCH F7~
Released Ely: )p.9 P
r Vesign Project Manager
544IRI~SWr £~ ~33O8 5~2
L~L ______________
Group A~Head: Rj.A'C~WIIII
lChief: DateSCP
Project WITT Bý9 NUC~LEAR? Pi_); SCP Affectedt-UnIts
Sytmor Feature (3 ,)UX/L b,41TY FERt' WA T59 . iSYSTEM
iRefeincte'l& Description of Change r-ORR~'? Ll' DRAWING(S PER ~ ~~\~T-
L~hi5)N"w ee_1~~
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
REV, DATE PRE- SECT. GROUP ANCH ECN D.P.DECITOOFRVSNTTA
NO ISUDPARED SUPV. HE-AD CHIEF CLERK MGR. PECITO FRVSO OAGE
__ __ DeC-7-,5gp 2- D&S qDF- 1) DW65 ~ AE
F ~ ~ ~ ýw ___03__ 030 5Z2_______________________________________________
2I - 3 IZE - __.___ _____ ___________________________________________
R eq n. N o. N_Fijiff~teriais as toiiows: NO PR RWLIP
AWal Information:
C(IEF. C05T PLAN91VG Ago CONITROL STAFF. W12C74 C-9 PLANT SUPERINTENDENTCI. I EF AcIRC ,TCTUhIAI. rI.PPORT BRAICK, hf;C126 C-9 CCISTA¶ICTI0CP "OJLCT XANACCICx4IEF CLIVIL EglO 011%.II BRAXCII.VW90ZZS C-9 ME S.VL63 C-
'k (. S'ECIAL 31 -. Pk0JECT3. W20022 C -I
TENNESSE!ý VALLEY AUTHORITYr.I'IVISION OF ENGINEERING DESIGN4
N1 S Acces!icn No. ro?__Uý) ý_kcceSSion No.
I i. .
TNNI~ESSEE VALLEY AUTHORITYDIVIrStCN OF ENGINEERING DESIGN.
EiNGsNEERING CHAN-1GE N.OTICE NO. ______
DATA SHEET NO..LI
[AFFCTE0] OwO a IS DATEUNI Ti DRAWING OR B/M NUMBER IEVI EXPECITEDU ACTUAL PZEMARKS
Ll P54R F.a. Q31.1-4-7
K~~~~~.E - IA F.Qc A41'
LL~15W17ý7 q12 2)O9
____q5817 97- 24 -7-29-
1?__ 1H5132,767-20_____ 4 SO_ __ _ __ _ _ L_ 2_ --- P _ _ _ _ _ _ _ _ _ _ _
/I4, PAGE F
14 ýN /- tl n - ý - -ý
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
MEDS Accession WY~
/7-7
3P '83 0818 050
F WE REPORT NO. WBNSUTP8267 R
WATTS BAR NUCLEAR PLAINT IE1UNIT 1
I PREPARERIORGANIZATIONIDATE J. D. Collins/WBP/August 17, 1983
JDESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,schematic, and connection drawings for the auxiliary feedwater system as aresult of the Black and Veatch'third party independent review. The Blackand Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, F111, F114, F115, F116,F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, P806
Approximately 24 drawings have been identified with minor discrepancies.
11DATE OF OCCURRENCE EST(C XI. ACT. ) 1978ZZt1400 OF DISCOVERY Third Party Review TrbL1- V A
~ * DE (EN DES-EP 8.01) 26 -i1BRANCH CHIEFIDATE
ifCORRECTIVE ACTION:- The minor electrical drawing discrepancies identified by Black and Veatchhave been corrected on the following ECNs and FCRs:
2816 - P123, F1243647 - P101, F102, F103, F104,3650 - F1ll, F115, F117, F127,E3458 - F105, F805E3508 - F110, F116, F802, F804
yE ACTION DEVI AT ES F
n~CEf.2u r~IT~gIA flACtIM~MT NA
F106, F107, F114,F141, F803, F806
ROM A DESIGN CRITERIA REQUIREMENT
F130, F131
YES
ECNECNECNFCRFCR
D4ECN REOUIRED f~YES NOO3 ECNNOý 2816, 3647, 3650 SIIDLIPC
NO~
EXCEPTION REQUEST NO
'ATATTS BAR NUCLFAR PUNIT
NONCONFORMANCE REPORT rn REPORT N. WEN
EASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANTI
THIS IS A GENERIC CONDITION YES E~NOSACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
19-IN DEPENDENT REVIEW:-
LABOR EST.( XI, ACT. I 1 20 MH D21 SCHEDULE EST. (X). ACT. II
22ACTIVITY NO. *See Below 19 TASK DESCRIPTION DATE INITIATED *S
F REMARKS: *ECN 28916 - Act. No. DZ85-E281669 Date 11/29/82ECN 3647 - Act. `Nd. DZ85-E364725 Date 01/17/83ECN 3650 - Act. No. DZ85-E3650R6 Date 01/28/83
This NCR supersedes NCR WBNSWP8267 RO.
f21DISTRIBUTION: ijALENDSCTOCMPT:CONST PROJECT MANAGER J. D. Collins, 5100 MIB-K ALENDSCTOCMPT:
28 EN DES PROJECT MANAGERCHIEF. ESBOFFICE OF QA .KIES (for Significant NCRsI)"c~H/O G
INSRS (for Significant NCRs)ASSISTANT TO THE MANAGER OF OED^- (QuaiityWB '8 0 18 0
.and Nuclear Safety)-f or Significant NCRs BDISTRIBUTE AFTER THIS-SIGNATURE &______0818______ Or__HANOCAR.RY COPY TOWM-NI-S- MEDS ACCESSION NO.
10520DIN5010105 20.92.0000
WATTS BAR* NUCLEAR ?LANTINDEPENDENT REVI=5W
ref: 10520.DIN4263
Finding Number /F /1 /2 /8/
0-PL
Comments pertinent to finding:
TVA drawings 45W600-46-6 R5, 45W1614-10 R3, and 45W2614-10 R3 have been issuedunder EGN 3642 to change control circuitry to bypass "open" torque switch forthe the "trip and throttle valve" (FCV-l-51). The bypass is required per IECircular 81-13. ECN 3642 is closed (SWP 830217 504 and SWP 830217 505).
The valve is being added to the active valve list (Table 3.9-25) in the FSAR'
Revision Package No. 369 (NEB 830421 263). All corrective action is complete.
Attached are copies of ECN 3642 and FSAR Revision Package No. 369.
Program Team Member Dat e
'Date
OEDC Program Manager
- n~ , ,,aC icy Committee
Black & Veatch
Classification: type /F Category A9-
Aa& Vetc Poec*MnaeBlack & Veatch Senior Review Team Chairman
FORM 3
Date
Date
ENGINEERING CHANGE NOTICE /-3COVER SHEET SW P '83 0 2 175,
(BEFORE ISSUANCE OF OPERATING UCENSE)54
TENNES-cSEE VALLEY AUTHORITYDIVISIOt4 OF ENGINEERING DIESIGtLfts Bar Nucflear P4laa,,S2*I~
To: Construction Project Manager I i
From: Diesign Project Manager,
DATE FEB 17 S83
SWP 204GB4_--Ki
ECN NO. 3642-
&rJd A/ tWas IJ Aralysis Required: Yes - No
Prepared by
9~w 47:.Released:-~' Project Engineer
VSCOPE
Project WATT-S SPda 1J~.JaL5Ag. EL-AýJT Affected Unit(s) 10 2.-SystemorFeature. FýEE ATEIQ coNAJk.oL_ Sy~s75(,1 (-46)Reference & Description eC14AiNJE C0A-1T72 0L. C-IRiCU17-Y 7ro 8YP'4LL
-C-14 PW~DIýJG- F= 12-8./ED: Yes -Date Branch
or Data SheetNo Available
ito
NON 10- -
NO0
A@ PIOWECTS DESIGN GROUPS
Civil
Eli 4 T-Cal E3.'4Mecn
"~0
NO
:OMM'i 1st
Unit(SI I
ENINEERING SUPPORT $RANCHES
Approval Required
j~pproveoz:
ENS ELECTRICALD. g*cNagr
ENS "f-CHNIICALBR01
Chief N~uclear Engineer
Required for PSAR or FSARRequired for Preoperational Test:
If Yes. Test No.
Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report RequiredQA.AppliesSecurity System Modified.Vendor(s) involved:
CC (Att&h~w.@Ii): =9 - eg((
C31I EF L&C"TECC1URL SUIPPORT DRARCM. Usd126 -CZ I F* CIVIL ENGINEERING sURCH. W90224 C-IPIEF. ELLCIPCAZ. CZCICEENIUC 3101ICM, UI126 -
C31 ,E?. XECuA.IICAL EuC EL Iu ARLCO. VIC126 C-9CHIL. 1 IUCLEA E UIBLEGER. WIOC126 C-9D.IEF . Q4ALrTy ASSURANCE ILLICI. 5100 1111"
- B '830624 51C COW. CMT PLARRISS A60 CONTROL STAFF. U12C74C-CHItF. VtCIAL DESIGN PSOJECTS. WV2022 C-9
%&AIGE1 Of C013TWUCTIOI. (7124 C-KPLAIT S9PtRId12TxDxREDS. W5663 C-9
DRAWINGS
FOSSIL. "VIR A SPECIAL PROJECTS DESIGNi
SPECIAL DE31C P3OJECTIF No
LUM11TEC1U3AL SOPPONT BUNC 160
jJAfeSICAL-WORK MUST BE DONE BEFOR7E-
Pre-.Oo 1st F.el Lrflwvn
Date -
Date
Date
Yes or No
M1o
A/ 0
_6
[TRALisr-c--g
*TE.KNESSEE VALLEY AUTHORITY.-ORI!MOF ENGINEERING OMSGN
ENGINEERING CHANGE NOTICE NdO. :3647wDATA SHEET NO. I.....
Watts lar Nudle Kami,.spriw gb Iti
'SIOBRANCH 'f
PAC.,LE
psign Project Manager Released By:~. esign Project Manager
Preparing Sectionsw.) P Wigs # -3PreparedBy- fl~ , HVEBSC %)J
Total Pages (RO): 2-SectionSupervisor:
MtFOS Mrc~finn Nn.
SW P '83 0 217 50Q.5MtU!S Accemsion No
R1 RIi__ _ _ _ _ _ _ _ _ _ _
Staff E g orRR1
Architect: A/Group RR
Hed31 7Branch____________________
__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
JChief: . teSCOPE
Project w AJAT-rs A Q AJ au CLc-Ak P LAri-7 Affected Units 1 2Systemor~eature 1=EZ:;?AV rEJP COAJ-YAZ-0L- S7Y5-F-, (lq6)Ps-lerence & Description of Change C4!A/~Cih.~. -,c/r~V -c P 5
'<~2~A/"7O0,!RQ(/ý SWv-rCR- E02 -T72-z' F /P ~ 7~,rrV,4LVE
RATES
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
RE.DATE PRE- SECT. GROUP DAO4 c .P. DSRPINORESONTOTALNO. ISSUED PARED SUPV. HEAD, CHEF CLECRK MGR. ESRPINORVSONPAGES
F -.iaes as follows: A1
ic Information: ____0 MR -5 7- C.24v'-7 . .ýe5.
CHIEF, COST PLANNIIU A091 WITROL STiAFF. WIC12c5 - PtAIT 5VI"ERWIRDaTD (C)EI EF ANCJIITECTU&L 3UPPO~rT SI5301. W&C~L2 c-D*STVJCTION PIOJECT NASAGE1C" I EF C, voL EIGINEE11u6 SsUCH.vW9022a C-9 "EMS VSb63 "-CM I EF ELECTI CAL CIG 1CII SNAACII, VSC12 C-9 #A3. 640 CSTZ-C
Er 11E1. A SC aL OiGA PEOJ TS. W20ZZI C-(
5*1'111 f-IVI-41 133:K
TEN~~VAL-LEY AUTHORITY ENGINEERING CHANGE NOTICE NO. 62- PACE)ltiv;:sz"~ N'ERN EIH DATA SHEET NO. 1PG
,FF ECTED OWG ISSUE OATE N DA
UNIT D RAWING OR SIM NUMBER REV. EXPECTED ACTUALREAK
__ 0______ 5 5- --S33 ..
__1.4 W164 1
0 "'A 10753 (ENDES-1O4O)
UNITED STATES GOVERNMENT
M em oran durn TENNLESSE-E VALLE MJTORIT
TO .. . Mills, Manager of Nuclear Licensiag, 400 CST2-C
7ROM lohn A. Raulston, Chief, Nuclear Zagineering Support Branch,IRIOC126 C-K
D A T E A P R 2 1 1 -9 8 3 -AS a R V S O P C A E ' 0SUBJECT: ~ ~ 'f~,~ i.. SR VSINPCL O
Attached is FSAR Revision Package No. aid The package contains
approved OEDC design input in accordance with ANSI N4..lfor
incorporation into the FSAR. As such, the material should not be
changed substantially without the prior written approval of NLEB-NLS.
If you have any questions on this matter, contact $W~d 9 &at extension ~L17/ -1
týZoJohnA. R~auls tou
cc: W.S, W B63 C-K, W/all attachments except figures
0 14, &~--v- -
Principally prepared extension 11-71
DEO5 ;FSALR.
APR 2'
4Buy U.S. Savings Bondt Regularly on the Payroll Savings Plan
C-.;,wism-4S
Table 3.9- 25 (Continued)
Feedwater System(Continued)
Anx I I isrVY
Feedwater system
PCV-3-241FCV-3-24SFCV-3 -3 SAI' C V-3 -4 RAPCV-3 - 90,A3-S083-50 93-5103"5i113-6383-6 443-6453-6523-6553-6563-66 93-6703-6783-679FCV-3-242
3-8623-9223-8613-9213-87 43-8333-8733-832LCV-3 -156LCV-3 -1
6 4
LCV-3-148
LCV-3-171LCV-3-114LCV-3-173Lcv-3 -172Lev-3 -17 5
ep;CV-1-52S
FCV-1-16
3-891
3-892
FCV-3 -17 9AFcv-3-17 91F C V -3 -13 6A
AirAirAlrA irAirAPAl'At'AP'AtPAt'AP'Al'APApA PAt'AP'AP'A ir
At'AP'At'At'AP'AP'At'At'AirAirAirAirAirAirAirAir
Nov
Nov
At'
Al'
"OvNovHUYv
Valve HQ_ JJ_&j LILLU 611QA 11ob
GlobeGlobeGlobeGlobeChoecCh ckCheckCheckCheckCheckCheckCh ckChe ackCheckCheckCheckCheckCheck
Globe
CheckChockCh c kCheckCheckChecakCheckChecakGeteGateG a t aGatoGateGateGateG ateaSpcacialIGate
Gate
Check
Check
GalsGe ts6 .s t 0
Spa Ci It
Rtevised by Amendmnut 4ýSheot 2
peadwater Control Volvo Low Flow BYPASS
F eduatef Control Valve Low FLOW By.paSs
Peedwatef control Valve Low Flow Bypass
P.edwater Control Valve Low Filow Bypass
ain Feed Check
IMain Feed Check
Main Feed Check
" a i A I e eo d C h e c k
PU Bypass Check
P11 Bypass Check
PU Bypass Check
PU Bypass CheckPU Bypass CheckPU Bypass Check
4
PU Bypass Check
PU Bypass. Check
PU Bypass Check
PU Bypass Check
Foedwater Control Valve
Low Plow Bypass
C on tainment I solation
cook ts imcia a SOl atin
Containment I .olation
Containment Isolation
Containment Isolation
Containment Isolation
Containment Isolation
Containment Isolation
Discharge From Pump A
Discharge Prom Pump A
Discharge From Pump B
Discharge From Pump B
Discharge Prom Turbine-Driven Pump
Discharge From. Turbine-Driven 'uspp
Discharge From a Turbine-Driven Pump
Discharge Froml Turbine-Driven Pump
Turbine Governor Valve
Steam Supply to Auxiliary Peedwater
Pump Turbine
Steamk Supply to Auxiliary Peedwater
Pump Turbine
Steam Supply to Auxiliary ceadwater
Pump Turbine
Steam Supply to Auxilidry Feedwater
Pump Turbine
ERCW System Supply to Pump Suction
IiRCW System'' Supply to Pump Suction
ViICV system Supply to Pump Suction
TLORxi"6 TsM9 AtMO -1TAcAV5L6 qAt-VE7
10520DIN501110520.92.0000
WATTS BAR NUCLEAR PLANTIMIEPENDENT REVIEW
ref: 10520DIN4306
Finding Number /F /1 /2 /9
0
Comments pertinent to finding:
TVA logic diagrams 46W611-3-3 R2 and 47W611-3-4 R2 were correct and schematicdiagrams 45W600-46-6 R4 and 45N600-57-5 R2 incorrect. The schematic diagramsand associated drawings have been revised and issued to show the limit switchto operate when the trip and throttle valve (FGV-l-51) is half open. Allcorrective action is complete.
ECN 3683 is attached.
Program Team Member
OEDC Program Manager
a ýrman, OE olicy Coxmmittee
__I745Date
1117/Date
Date
Black & Veat ch i-e.. i .74A 4= 4ji.4iqL//~,
Classification: Type /'CategoryA
/ 7BliN .& Veatch Project Manager
Black & Veatch Seir Reiw Team Chairman
Date
Dat6
FORM 3
ENGINEERING CHANGE NOTICECOVER SHEET SWP W3 0214. 51
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSZEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
To: Construction Project Manager
From: Design Project Manager -
DATE FEB 14 M04
ECN NO. '36S3V/sis Bar Nuclew Pfa trSRM2.ýYl is
SWP 204 G&K
Was UJ Analysis Required: Yes No
Prepard
Project EngineerReleased-
SCOPE
Proj ec.7ATT '%,AP NVC-LEA/ PLAA/~T
fTr~A ~J5 FEPA~J
-c~j~Section Leaner -_ __
Dipign Project M (ager
Affected Unit(s) '147Z
System or Fe WA7~f TaR~Y (~Reference &-Xcri f Change RELISE; / 'MIT Sk!-rCH OEZ-110dJ 5c4 77 -7 7- -r4 ECOT7ER 2 21PA1 c5 4 R0 To-LE " VALV (E-ý-SI -51Le PA /
THR-r--L.E VALVE Is t4AL-F oPEW- keE: Buz..c i v~r-Arca nIo~llDRAW[?S 'MS INVOLVED. Yes Date Branch.
eet Reuird) ~ crý. Data SheetReqird)No Available
4 __
AElectricarj /M
~~~Me Mecanical ~t'~ear NO
NUCLER PROJECTS DESIGN ClOUPS;
CivilElectrical 42., E3Mech
FOSSIL. IWO.. A SPECIAL PftJlEcTS DE~SIG
SPECiAL bales Ps0,1CC?:
ARCS I TEIJ61AL SUPPORT 9&AUW
jR..rSICALw WOR MUST BE OCNE B3EFORE-:
Tes Load Powe
Y65
AJ'O-
EomFIsFt
Uflitli)
. Ye
Approval Required
or: - rnch review: ..
Approved:
E23 'CIVIL 11Fa
ENS 14LCNANI~ LB11. CHIEF Date
Cie utý Engine'er Date
Yes or NoRequired for PSAR or FSAR 4Required for Preoperational Test:
If Yes. Test No.
Vendor Backcharges Involved At0Seismic Analysis Required A/0Nonconformance Report Required A1QA Applies ESecurity System Modified
Vendor(s) involved: AAQ
UJODfe '(10f 2 1 Cn
CHIEF. COST PLANNING ARO CONTROL STAFF, vt~c74C-CHIEF. SPECIAL DESIGN PROJECTS. W70124C-05AGA~t Of C0STRUC~tOg. EMS2 C-9
CC (AttachmnwýI: . Y ()
CM IEf. ABCWITICT'SEAL SNPPOErT SuANCK. vaCI26 C-aCH IEF~ CIVIL ENClSCIIS S1&50 ARK 9022e -CHIEF: ELECT lCAL Em3i~u 1 aa. 6siZ U C -I01IEF . YAEOI&IC&J. 1ICISUE&IC SRA"aCaI. VICL26 C-4
Sei;tion,
= - = - = - M
#ý 3
ýaý 11ý --4; LZ
TENNEZScSE VALLEY AUITHORITY_ ENGINEERING CHANGE NOTICE NO. 1683vzOer- ENGINEERING OESIGN DT HE O
Watts Bar Nudew ar v-±Spring City, TNTo: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
DesLn Project Manager SP '204 GB-_K
IIRANCH
PAGME
Relearsed By-
0 Design Project Manager
Preoa-ng Section5L3P Wi_=G # 3
PreparedBy:Ký-. 0, #/85C4M,4A./Total Pages (R1O): 2-=Z = 11Section
Ir a ACrSC n1
I _ . - 1 1 0
F: '83 0214 R6~-T *-
Staff Eng. or 2 R'Architect: A11,426.GroupRHead: 3-~Branch /.Chief:-
SCOPEProject AT7T-S PR~i NOC]EA( PLA PJ- Affected Units 12-
System or Feature DWTR CQATrP0L_ SYST•AI 4; )Reference & Description of Change REVISE LIMIT~I SWJTCR OPERAT/OA' Su14'c TPkA7-r TIM
C0o4TRt'L CIPC UIvr1y A:OP T1418 117RIP AdDI TA'Rn-r-rLl" // ALV9(JýC~v -z,- 51 oP .i-ERA-s V/iqF-f1,. 7146 "-RIP AtP.W T74pgo-rLe'
VA L-Ve ( 5 l-AL-F- 0 Pe tJ.
SEEASOCATD RAINS*IS. REESESD
A~ Inoraton
C14EF CSTPLNNNCAM) OSOI3LSTFF SEEC7 ASSCITE DRAWNGS LS T. RE E VDE RS SDCIEv. DA."TECT I ,UPRE. SE 2ACT. WRUPRACH2 ECNTUCIC OP.E DESC IPIONO RVSINTOC.! SSE! EL PTI AL NIRED N SLJV. HA D ICHIEF C LER MOR.. 6PAGESZ
_,IFSEIADE i G j zCi_ _ _ _ _ _ _ _ _ _ _
U I y I
TZNN~SSiEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. 36DATA SHEET NO.LI
PAGE E
AFFECTED RANGO O/M NUMSER ACT ALIN
UNIT DRWN RB/ UBR REV.1 EXPECTED I CULREMARKS
5 I5-2.-S3K3~3 (-S -
____ I ________________ ~. - _____ ...
1 2
I. 7I I
____ I _______________ ____ ____ ____________________
__ I _______ __ __ _________
__ I ________ __ __ I ___________
*1* I
__ ______ __ .1. __ 1
I.
I:
_ ____ _ I
__ I _________ I
_ I _ _ I
________________________________ I
_I .. __ __ _______
__ I _________ ___ _____________
* I I
-- I
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING OF-SIGN
ENGINEERING CHANGE NOTICE NO. S.DATA SHEET NO. Z.
affs Bar FRudif Plo~t, Spflng9 city. MFro: esin roect Manager 204 i C -
BRANCHI
'PAGC
'LS
Released By:DeinProject Manager
Preparing Section MEDS Accession No. MEDS Accession No.
Prepared RSWF- *1 0214 5:664By: C. __ _ __ _ _
Total Pages (RO): 2-. R RSection 151Supervisor: 6'2Z , RStaff Eng. or A'2 6Architect: /L
GLroup 9 Y R R
Branch____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief: DaeSCOPE
Project WIArn 9S4e NuCLF-At IOLAJAd Affected Units I4 .System or Feature Feso wgree- cdevre4L- svsr~o ý4'1(/Reference &Description of C hang e ee~s LVimir. s C4iTc~t4 0 P 6 eAr/a, AS 6CH 7-AArA
O2.OAJTheOL (!~ur- O T14E uZI AAJb 7T41ZTrLF J VALVE (F~'-,--'r) 0R&4A7r-CS
LJ;g S J TiET le I THR.o T14M V ALi V S E U1 LF9 oP.: E-uiJ FA VSA7 H
5~ -,
SE SOITDDAIGSLS.RVRESD
REV~~~~~~~~~ DAE PE.SC'.OPBRNH. C . OA
NO~~~~~~~~~~~~~........AED UP.......... CERMM. DSRPINO RVSO AE
0. AIzJ-:V7: Materials as follows:
Additional Information: A11 AJr7A.J0F
OAIIZ. MOST PLANNII. "0C COUThL STAFF, WLIC74 C-9 PLAIT SUPERINTENDXTgOCX'r, AmCNITECntUAI U4PPO~T RRA40. WACI21 C-9 CONSTRUCTIOG PROJECT M&.5&Gfl
"ErN04ESSEE VALLEY AUTHORITYo~vtSf ON~ OF E:NcGIEERING omSIG. ENGINEERING CHANGE NOTICE NO. 3983
DATA SHEET NO. ----7G~
OWaR Ev.
ISSUEEXPECTED ACTUAL
-t *9-
P r- ýLa]
10520DIN211110520.15.1000
TELEPHONE MEMORANDUM
DATE 11/28/83
H. E. McConnell TELEPHONE (615) 632-4450 TIME 10:15 AM RM
Tennesspe Valley Authority
RECORDED BY. W. J. Zid7fitinas
cc ti. E. McG~onnejll, TX
R. 1. Ba isde11
MBNP - ThdenenntReview
Finding Rep~or~t Responses
.PROJ. NO. 10520
FILE NO. 15.1000
Mr. McConnell returned my call of earlier this date, and we discussed the followingFindings.
F129 -The basic finding required TVA to determine what was intended, to fix theappropriate drawings, and assure proper field installation.
The Form .3 only addresses correcting the drawings.
What action is planned or has been taken to assure the installation iscurrent?
F785 -The finding was generated against hanger 03B-lAFW-RCO5, but documentationindicates hanger 03B-lAFW-R5.
What is the difference between the two drawings? I have verified theoriginal hanger number by reviewing attachments to DRR 56.4 DIN 3600.
F790 - The finding indicated two conditions. The firstincomplete. The second was that a dimension wascompletion of the hanger by submitting a copy ofHow was the dimension problem addressed?
was that the hanger wasincorrect. TVA addressedthe test No. 8 ticket.
F825 - The date on the Test card predates the TVA Form 1 which states the inspec-.tion was not complete (11/5/82 vs. 11/24/83) . A formal explanation orlater test records are required to clarify or resolve the issue.
Homer indicated that he would look into the concerns.
b am \RECEI1VED B & V
RO CTNOV 2 9 1983
(%Q) (FROM)
COMPANY
PROJECT
SUBJECT
PDCA/F le
TENNESSEE VALLEY AUTHORITY 105 20.14.0000 Il--KNOXVILLE TENNESSEE 37902
400 West Summit Hill Drive, W10C126
Black & Veatch ~J./))L11401 Lamar AvenueOverland Park. Kansas 66211 RECEIVED B & V
Attention: Mr. W. J. Zidziunas D EC 1.6 1983
Gentlemen: PROJECT #/65
PERSONAL SERVICES CONTRACT NO. TV-60052A
In response to your telephone request to H. E. McConnell, we areproviding the following additional information:
F-129 - TVA has verified that the field installation is complete forunit 1 and is in accordance with the design information provided withForm 3. Installation records are available at the site.
D1IRJ5O'flF-506 - Enclosed is a description of the screening program TVA used toassure that the sample program was adequate to he representative ofthe worst case likely to be encountered. This information is includedin the NCR documentation._ 6~~qF-718 - Enclosed are the field inspection records associated with this
f .n g.ow 5103F-803 - TVA has verified that the field installation is complete forunit 1 and is in accordance with the design information provided withlForm 3. Lnistallation records are available at the site.
CIAJSIt /F.-808 - Calibration and testing of the instrumentation and controls isrequired before system preoperational tests are conducted. Thiscalibration and testing is done using written procedures and therecords are reviewed and filed in accordance with TVA's QualityAssurance Plan. These records are available at the site for review.
iIAJ617%-F-856 - Enclosed is a reproducible copy of the computer printout forthis finding
01-1 4 AF-863 - Enclosed is a reproducible copy of the computer printout forthis finding.
F-932 - Enclosed are copies of drawings 47W427-204 R3, 47W427-220 R2,and 47W221 Rl.
F-935 - Drawing 85M47W427-204 has been redrawn. The new drawings areenclosed (see F-932).
F-948 - Enclosed is a reproducible copy of the computer printout forthis finding.a
An Eaual Oooortunity Emnoloyer
2
Black & Veatch
D/4)5Zý0/F-960 -Enclosed is a reproducible copy of the computer printout forthis finding.
F-818 - Enclosed is a reproducible copy of the computer printout forthis finding.
F-815, F-816, F-817 - Enclosed are copies of 85M45W427-205 and 45W427-206.
Very truly yours,
TENNESSEE VALLEY AUTHORITY
j0% John A. RaulstonChief Nuclear Engineer
Enclosures
FORM 3
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number IF /1 /3 /0/
R-PL
Comments pertinent to finding:
47W611-3-4 was revised to agreeaction is complete.
Attached is copy of ECN 3647.
10520DIN508110520.92.0000ref: 10520DIN4258
with 47B601-46- series and 45W600-46-6.
Program Team MemberI$/
OEDC Program Manager
Cha n, OEDC Polcy Committee
Black & Veatch
Classification: type Category 11f
Black & Veatch Senior Review Team Chairman
Dat
Date
Date
14tate
'Date
,.Oý 11C%4ý 0.7-1 -/V -aý
1~<~
ENGINEERING CHANGE NOTICECOVER SHEET SWP W8 0214
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN~attS Bar NudogW pEAWC ilsk
ECN NO.- 36___17
TO: Construction Project Manager
From: Design Project Manager
DATE FEB 1 f
Was IJ Analysis Required: Yes-
SWP 204 GB-
No
4.1'
0KA Project Z"164-7r5 "rg2'ew,
System or Feature %/
Affected Unit(s) //Z
P441t~-~ ~ (3) NC~ WArJ SwF~2L7
Reference & Descrlpt'6 '5 O~.f fO i " 0c, 944Y/.V4 5 &,1/0 7rA'
13RAWINGS dq W `iVOLVED:"ZJ)Yes
EERING PPORT URAIC
Mechanical L
NUCLEAR PROJECTS DESIGN GROUPS
Civil A/0
Electrical I yosMech 1
FOSSIL, IIYORO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS
ANCISITECTURAL SUPPORT BRANdI
-WBP -T-8 2-6--CC (Attacnme.1~s): INNS Y eJ. .5~
- CHIEF. ARCHLITECTURAL SUPPORT BRANCH. U1C126 C-K:Y: CHI1EF. C IVIL ENGINEERING BRANCH., W90224 C-9.. CHIEF. ELECTRICAL ENGINEERING BRANCH. WOC126 C-9
CHIEF. MECHANICAL ENGINEERING BRANCH. WIC126 C-9CHIEF. NUCLEAR ENGINEER. W10CI26 C-KCH IEF. QUAL ITY ASSUR ,ANCE BRANCH. 5100 MI1-
Date BranchData SheetAvailable
& k &6r dr6)(sw
Approval Required
EC I fo branch review:
Jkesign Project Mager Date
Approved:
~t ~ RC M Date
cm Date
CO'e NulerEnine Date
Required for PSAR or FSARRequired for Preoperational Test:
If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report RequiredQA AppliesSecurity System Modified
Yes or No
A/AV
x/ 0
~i Vendor(s) involved. _ ______ ______ 0_Pole
CHIEF, COST PLANNING AND CONTROL STAFF, W12041 C-4CHIEF. SPECIAL DES1GN PROJECTS. W20224 C-9MANAGER OF CONSTRUCTION. [7522 C-9PLANT SUPERINTENDENTMEDS. WSS6J C"
Prepared by
I/ Project Engineer
EW,*122f 5y5r_,C,2 f -3 NCQ W" SWP83L6-7
MXW/,07 ,ctZy) cl6o'-
9 4 .
TENNESSEE VALLEY AUTHOR I
5,ODIVISION OF ENGINEERING OESI
ENGINEERING CHANGE NOlON ~DATA SHEET NO...
Watts Bar Nuclear Ptat, Spring City, TN~
Design Project Manager S~q170.24 QX~~
FEB 14 13~
rICE NO BRANCH k
Released By:PretPAEL4(/ -esin rojctManager
Preparing Section MEDS Accession No. MESAceson No.
-!ýec4~ / I~i R ~ flp 214 57U0-Prepared 04
PBy: A 7s -d96 .*7 -_____________
Total Pages CR0): R.Setin O41.2 523 5 _ __ __1_
Supervisor: RR
lGroup R .- ,R
Head:37Branch I______________I______Chief: a:, tel
Project 'A1'47r6 '9de lgý~e'lo piSCOP Affected Units /I2-
System or Feature 'eL4d 674 S2't()
Reference & Description of Change ,il-s eeyzeoz- 4 4,, zeqe P4,e.'i,ý14 S 7-0
,Ncol9p 1 '159re &4.ee 61 reý ~ C4,P/Alp/A- S CI 10 4'16 r Feo 3.
e-. IS.I
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
REV. DATE PRE- SECT. GROUPBRANCH ECN O.P. ECITO FRVSO TOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR. OCRrONFRVIONPAGES
R~o.Al p terials as follows: &4- l
A al Information:J g Ad cu./t 4 .J5(
CHIEF. COST PLANNING AN0 CONTROL STAFF, WlZC79 C-9f PLANT SUPERtINTENDENTCMHI EF ARCHITECTURAL SUPPORT BRANCH. WAC126 C-if CONSTRUCTION PROJECT MNAGAERCHIEF. C I VilL ENGINEERING BRANCI4.WW4O22if C-if NEDS. W5863 CKCCHIEF. ELECTRLICAL ENCINEEREI6 BRARCH. WBC126 C-K ARMS : ifO CSTZ-CCHlIf: SPECIA DESIGN P ROJECTS. W2022R C-9
TEI*14USSýEF VALLEY AUTHORITYoIVISION OP ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. 3421 7DATA SHEET NO. I.
ir 1 LINEAFFECTEDJ 0G 1 ISSUE DATE ýN OA
UNIT DRAWING OR B/M NUM5ER jRWEV. I EXPECTEO 4~ IATA REMARKS r RE
.~ 3* r - Cr' - - - .-
97w~as~-8 IL
LLL ____ _____________________ /
9?a/~boo-~7 .~- '4-j3-'~63
____________________________
___________________ - -
____________________________
________________________________ I
________________________________ I
___________________________ I
____________________________ I_________________________________ I
____________________________ I
_ ____ _ _ I
_________________________________ I
___________________________ I______________________________________ ______________________________________ I
___________________________ I_____ IL ___________________________ ________________________________ _________________________________
PAGE
FORM 3
WATTS BAR NUCLEAR PLANTIIIDEPENflENT REVIEW
10520DIN5082 8
10520.92.0000ref: 10520DIN4259
Finding Number I F / 1 / 3 A1
R-PL
Comments pertinent to finding:
45N600-57-5 was revised to agree with 47B601-3- series.
Attached is ECN 3334.
Program Team Member
OEDC Pr~ogram- Manager
All action is complete.
6CAý 3Cha , OEDC Poliy Committee
Black & Veatch
Classification: type Category AY
Black & Veatch Senior Review Team Chairman
Date
Da ee
V Date
bate
ENGINEERING CHANGE NOTICECOVER SHEET SWP %~3 0120
(BEFORE ISSUANCE OF OPERATING ILICENSE)
TENNESSEE VALLEY A.JITHORITYDIVISION C;: ENGINEER N;%G DESIGN
To: Constiruction Project Manager
From: Design Proect Mamager
DATE JAN 2 0-15a
Was UJ Analysis Required:
ECN NO. 3 33 )4
Watts Bar Nuciaw ?Jl 1f n, y, iŽ
SWP 204 GXKI
6-dj~e', die, ?at. I
Yes - No to-
ehi4ARLes e. pr15/ERTepare by'
Released:Date
SCOPE
Project IA4Q7~TS B1QR NUCLEAR PLPjJbJTSystem or Feature VA ) Q V A SY 9M -r
Affected Unit(s)i
14eR IW3e4-simp8~
Reference & oesciptio~~ngche R~EM IS S649)MAT)C AND rDAWfEC161 TJOAWM :r
ACLR'EC Wje- DIAtREQMS ed/ VM9kOUS 2WSTrAMENT SETTLZJLL, ERLP-AeXk Z WR!QJ/1AJZ'Th4S
DRAWINGS 0 1AI LVED:
AUCNIEC13A Sffl i
N f'SCA WR K U T~ D~
E O E
j 5eO41CsIC.e J" DTtwft@
le t CU L.d o
Ffl3;r)s;F)2f~'FC4 oppwYes Date Branchor Data SheetNo Available
JL-
NOQ
ApQ
Ila
COcDerfnl IRi
nfit($vtS)
&
CC (AttaChmno.G*): - -- Y6 dJCHIEF, ARCHOTECIWRAL. I~T 11"ASCH, V4Cd26 C-4CHOI EF, C IVI L E5141EERMS SHANCM. W90224 C-KCHIEF. ELECTRICAL. UCISEERIIS MUKACH. WIdC126 C-9COOI EF, NECNARICA&. ENGINEERING SLIACM, VIC126 C-9CHIEF, NUCLEAR ENGINEER. Wl1OO.2f C-4CHIEF:, QUALITY ASSURANCE 86A2OW. 5100 NO"-
O CINuEzm u G S IOPPOrr BRA NCHES 7 TApproval Required V
ECN Inca review:
Approved;
ES CIVIL It CIat
ENS LXCýýI I. CIIF le
ENS ONE ANICAL 39. CNIEr Date
Chief Nuclear! Engineer Date
______Required for PSAR or FSARYERequired for Preoperational Test: ~ i
Of Yes. Test No._______
Vendor Btackcharges InvolvedSeismic AnalysiS RequiredNonconformance Report Required
Ist O~A Applies yeulSecurity System Modified NO
zizziVendor(s) involved:
CHIEF. C23T PLANIGGS AND CONTROL STAFF, W12C74 C-aCHIEF. WMCAL OLSIGEI PROJECTS, W20122 C-4MNhAGER If C093rt~CTIOO, E7924 C-11PLAN T SS(ERINETUBUTWEDS. VU63 C-4
Project WATTS MA ht CLE198 ELANI
-TENNESSEE VALLEY AUTHORIT'DIVISION OF ENGINEERING CESIC
jA-.n Poject Man.ager ZVI)'
ENGINEERING CHANGE NOlDATA SHEET NO.
P0)n ('l
nCE NOBRANCH
-~~ PACE I2~
Released By: 9 6 2 ff67~z-t~Dign Project Manager
Preparing Section MEDS Accession No. WEDS Accession No.
Prepared 02 SWIP or3 01 041Bya) E C, F)5HER - _______0120___501
Total Pages (RO): (R) 13RSWp '30 1 530 R _________
Section __________1_________ __800_____03 14______5____
Supervisor: 4 Z2? RStaff Eng. or Rf 6Architect- 2 1Group RHead: 31-d 71Branch _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief:ae- SCOPE
Project WflrrS SO? N124L~qR PLAA17~ Affected Units p..
System or Feature VAqRIOUS .5YS7TMSReference &Description ofChampe RFI~J~)4 M~e AJ7D L'NAICTO DAWY
T:0 PnAREE WITH L061 DIACRAMS ON VARIOUS X6151T90MEAJT SETT'Ne3.RZP: BLACK t VSAW4FNz))r PD1C3 E12-9 F)2v E1132' FAQ1I
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUPBAC ECN D.P. DSRPINORESONTOTALNO. 1ISSUED 1PAREO SUPV. HEAD CHIEF CLERK MGR. DSRPINORESONPAGES
_3-N4.2 Eb /.V O Dete4e /7 D ?s A'to x. 2pV
Ž2qn. No. 3'L 3~ia~sas follows:
AddWllnformation:
CHIEF, C0ST PLANNING AND CONTROL STAFF. W12C7S - PLANT SUPERINTENDENTCHIEF. ARCHITECTUIRAL SUPPORT URASCN, 11416C -9e~ CONSTRUCTION PROJECT MANAGERCHIEF. CIVIL ENGINEERING BRAMCM.VWSDIIR C-9 NEDS. W593 C-u
ENG. LcR~A ICIEEREIUG31RANCII. WB11 C-9 ArmS 540 CST2-CCNIEF. SPECIA DES1GN PROJECTS. vZDZI*C-
TENNESSEE VALLEY AUTVIORITYDIVISIONE OF ENGINEERING4 OiESIGN.
ENGINEERING CHANGE NOTICE NO. .3 3 3DATA SHEET NO. LI...
AFFECTED jO#G ~ ISSUE OATE- IEAK
UNIT DRAWING OR B/M NUMfER JREV. EXPECTED IACTUALREAK
I. I I
PAGE
) -Lb Lr 1502- 1 1 --
Zg ll5W7ev-27=-2 -I---
1z Ll5 6t4 oo-3-- _p __ ___ __ ___ _
199Z J~45N4, 04- 3 Z ½ . - - _ _ _ _ _ _ _ _
)2-2 q5Nto 0 --n-9 2-.
I~ ~ A/ N ~~ - 2..oo -ti --2 -i
l~k q-9~O~1- A/ b- - - -- 7
1Z2 z i SM 66- 117-$ - _
L~~~LA ~ oý -5N , ,Y '~7- )1- .
I_ __ Ae ofE
-TVAk 10575E (EN DES-7-79)
-.tNNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENG INEERI NG, CHANGE NOTICE NO. .333q~
DATA SHEET NO.~L.
-, F
DRAWING OR B/Ml NUMBER
ISSUE DATE
EXPECTED ACTUAL REMARKS
PEUPDATED"DTA 9ýIET
[ REV. NO.
7 11 e- v-9 ---a
2. q W760-3-1 __-20-83 _ _ _ _ _ _ _ _
&i71O-3A HI?1112 -q5 S 3f
-~ .. LL& g5~AI7Iit?-3-)/ 33- 2--g3 ___________
_ 523 27~~ IL A_ ___93__ _
142. ý4L5W 75~f/ -1
~~ '458M71 -0 ___v__2±!9__
_ I q 5 B m7-44 0 __ _ _ _ _ _ _ _ _
2 ~q5 13)? 6 0 0_ _ _ _ _ _ _ _ _ _
.2 AJ53 VA7 -02 _ _ __ _ _ _
____ qSH O-N~cS-7-S - -_ _ _ _ _ _ _ _ _ _
____ ~Lf J6 06 r-S -ZL f. JL i _ _ _ __ _ _ _ _ _ _ _
____ ys1-wgoo-6 7-31 _ _ _ _ _ _ __ _ _ _ _ _ _ _ _
q~rA.)(Eoo -sr-I
qS,&J 600 o-& - 7-
3-J-43'II
PAGE EW
I A-
F-l LlYNIJ600 -7 1
4fAJ 6 00 - 7- t/
TVA 10575E (EN 04M-7-79)
7ENNESSEE VALLEY AUTHORITYCMVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 33k DATA SHEET NO. )
DRAWING OR 8/M NUMBER
T-Y VISSUE DATE
DWGREV. ý EXPECTSED ACTUAL IREMARKS-
PAGI
! IEOREV.
____ (o 3-Im-Y3 2-4-~3 _ _ _ _ _ _ _ _ _
415w~~eo - 0.
Q,=;=CTED
ý^IT
rt AFENT~Z
DIVISION OF ENGINEERING DESIGN
NONCONFORMANCE REPORT
MEDS Accession No. SWP 'ý32 1 2 2 1 0 1 9
WREPORT NO. WBNSWP8267
1 13,1 UNIT 1
D4PREPARER/ORGANIZATIONIDATE J. D. CollinsISIJP/December 21, 1982
:3DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,
schematic, and connection drawings for the auxiliary feedwater system as a
result of the Black and Veatch third party independent review. The Black
and Veatch finding numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, Fill, F1U4, F115, F116,
F117, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
6]DATE OF OCCURRENCE EST (X). ACT. I ) 1978 10SIGNIFICANT CONDITION ADVERSE TO QUALITY~YES 0 NON
L71 METHOD OF DISCOVERY Third Party RevieUAMSODE (EN DES-EP 8.01) j [i~ BRANCH CHIEFID~~E ~ I ,2 U/F L..
:TIVE ACTION:
T1A'~YC' ~ 1~Tt¶m~Av DT A~T
D2 CIEACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NO [13 DE N CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
104) ECN REQUIRED Q YES NU[] LCNNO 15SCHEDULE IMPACT [D P [3 A C] N
FORM 3
WATTS BAR*NUCLEAR PLANTINDEPENDENT REV=,-
10520DIN509310520.92.0000ref: 10520DIN4361
Finding Number /F /1 /3 /2/
R-PL
Comments pertinent to finding:
The time delay range for relays TDl and TD2 (45N600-57-5) was revised to matchthe timing range shown on the logic diagram 47W611-3-3 R2. The exact relaysetting will be determined during preop testing and the necessary drawings willbe revised at that time to document this setting. All corrective action iscomplete.
References: ECN 3334 and NCR WBNEEB8301
Program Team Member
OEDC Program Manager
Date
Date
bte
Black & Veatch S ~?-e~~~-.e 17
Classification: Type ,9 Category 'AY
blaý& Vatc ProectMangerDate
BLack &-Veatch Seni or Review Team Chairman 'a.
ENGINEEI
(BEFORE I~
TENNESSEE VALLEY AUTHORITYDIVISION -F ENGINEERING DESIGN
\Aa',ts
To: Construction Project Manager
SWPFrom: Desin Project Manae
DATE JAN 2 01983
,,,ý,Was IJ Analysis Required: Yes N
C2ARLES~ e. F15H.&R _
RING CHANGE NOTICE 1,COVER SHEET SW? W8 01 20
SSUANCE OF OPERATING LICENSE)
B.ar rUuc-ar PlzLr7J, 52Lri19l ý~iy
510
ECN NO. 33L
204 GB-K
01,
&p~~eared bySection Section Lifrader-
Released:__ _ _ _ _ _
Project Engineer sgPrject Mallger .Date "i 4 jSCOPE *~
Pro ? d WA TS BPI& NUC'LEPR PLAN)JT Affected Unit(s) c.
--,' ýýSystemorFeature VtAR)ZL9S SYS715M.S NCLW V SA~W 9 8:k(-7i.-:efreceDescrIpition.QChange )'EEVISED SteJREMAT;C AND IýOWEC T-1N PRAMN6L5.J .
U RAWINGS 0 1 LVED: Yes Date Branchor Data Sheet Imth SPOTSAOSYe
(Dt Sh d) i ApprovaRequired£
~~~~~N Av fableIVI R ~T. at.
I C GOUS NSELCTIC aYH
EC is anch review V
Chief Nucl ea EnI neer DNCate . Z
OSSIkUL. RYR J SECk;IAL PROJET P S3Ys rNWI. 551C PROECTSjp _______ Equre forI:.ý ISAR oFSA
Rheq uired fr'Prieperatoa Testte
ARCNITtCTVNM. SUPPORT I f e. et o' __________
Vendor Backcharges Involved )0Seismic Analysis RequiredNonconformance Report RequiredQA.AppliesSecurity System ModifiedVendor(s) involved:
N 0NO A) Aik
CC CAttaCmn-.,It~): Tfta.-1'O- Yes-c5CHI EF. ARCHITEC:TSRAL SUPPORT BRANCH. WICC12 C-9 CHIEF. COST PLANISCI AND CONTROL. STAFF, WIZCTRC- PCHIEF. CL1YILSE9;16EE(RIGEqQAI1CMH 02 C-K CHIEF. SPECICA.L DESIGN PROJECTS. -WzoDOS C-9CHIEF. E ET I S-I. tmIEEIG85M.W Z C-i HA AE G OF C0ISRUCTIO1. L7924;C-9CmEF . HE CH A 11C..P.EIGII(ERI:G RRAJC". VTCIS C-9 PLAST 5PJPE~iITENDENT -
C-1EF. 4 UZLI 't CIGIREER N WOCI2A C- I HEDS. " 56SAS C-1CNIEF. CUAL111 AL-3ASLE 1151CR. 5100 "18-4
TEN'4:%ESSEE VALLEY AUTHORIT'OIVIS.! O'CF &LNGINEERING OESIC
To:
JI
ENGINEERING CHANGE NOI14 DATA SHEET NO..
Wa',; Par Nudear Plat41, Spriri.9 City, PA
Design Prolect Manager
ISection
Prepar-: ICBy:ý:j9 E C, F1NETotal Pages (RO): ( eSectiof,Su pervisor:
Staff Eng. or2Architect: 171/A
MEDS Accession No.
UP~ '83 0120 501
1 -CE N . 13 41BRANCH
-~~ PAGE W12~
Reieased By: ~AProject Manager
MLIJS Accession No.
J1SWIP T8 0314 5305 J.
Head:RRChiief: D5a teI
SCOPEProject WflTES BP) NUCLEAqR PLArN7- Affected Units 1p 2.
System or Future VAR.) 0 0 -5 YS IEM-SReferen.e & Description of Change REV)ISED -e-0f)4M87 I' RAND LONAIE-C TION DRAW)NA(4S
:0 961947E WI TH L06le DIfl&RAZMS ON Vn981L.'S rA/57RUMEAJT SE-TIN6a.
RE: BLA C K t VEz9-cJ. ) FIN D) NCG, F)13 E 1)2• L E2~ 1 E 38 F A 0
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV.1 DATE PRE- SECT. GROUP BRANCH -ECN D.P. DESCRIPTION OF REVISION TOTALNO. ISSUJED PARED SUPV.! HEAD CHIEF ICLERK IVGR. PAGES.
I1 3-1/-81JE~b )CS D e-e /7 Q.j 4DvP -p c-k 3
n. N-. -93Jqd t*r'als as follows.:
17da nformation: .v
C1IEF. AA3-7 STECT5IEAL SUF'-T 110AICH, W4C12A C-1 CONSTRJCT101 *tOJECl -UAGERCNIEF . C, SI L EE.JE t.-IF SLh.Ci.VW90224 C-9 " EOS. V5863 40, 1 E. ELUr:TRICAL ENGIICIEtI54 IIANCH. VOC126 C- RN6S. 640 CSTI-COIIEF. SP'E:IAL -ESIGl PPO4ECCI. V2O224 C-9
0-,--ýign Project Manager
E2I.,
I
TENmN--ScSEF. VALLEY AUTHORITYciVISION'OP ENGINEERING DESIGN.
ENGINEERING CHANGE NOTI ICE No. 3 3 3AYDATA SHEET NO. ~
A FFECTEO OWG ISSUE DATE INE UDAT -ED
UNIT DRAWING OR B/M NUMBER REV. EXPECTED_ ACTUAL REMARKS R
J~~~&J r,3A72 IL ,~ 3-~?_ __ _ _ _
12 2 95NI 72 1-.LLZt 2-1 lW760-;?-3 IZ
/~a 'SW70- 6-Z S__________
,&ze. qIW740e-27-1 A,_ __ _ _ __ _ _
{L ? 9 q5. IQ4 3 3 1. /:7--q
2aLI5N 00-34 -
L~Z 'V561 - __ - -3 -Y________
12-.2 Y5NAg0,0O-~-7 _ -- I5L~~2 95N 06 'Y7-) 7_ _ _ _ __ _ _ _ _
-- 4
q-I5
PAGE I
01-4A 10575E (EN DE-S-7-79)
-J
TENNESSEE VALLEY AUTHORITY01" r-/ISION OF ENGINEERING DESIGN
ED OCAWING OR 811V NUMBE
ENGINEERINO CHANGE NOTI IICE NO. .3 33 1q
DATA SHEET NO..L.
R REV.
ISSUE DATE
EXPETED ACTUAL
_ _ _ _ _ _ _ _ _ _ _ _ _ _ I OWG_ _
REMARKS
'~AGE~
INE UPDATEDN DATA SHEET
REV. NO.
D e It *e.
+)2-2 /-26W8 760-___________3
12- z LIS '1VW7/ 0 3-3s IP - 3 -q-JI~ 12- 5W76 0-:3`4q
iIK '5WA7/,LQ3-)It 332-3TL '-I5 71~7 b 79 f7
I. 15 31 __ _ _ _ _ _ _ -- 2 8 4_ _ __ _ __
.2 .Z L532?1,7- 2A _ _ _ _ __ _ _ _
Hd z 45 i~ -3 o - 2 3 3 3__ __ __ ___ __ __
>J11-5 LjB 79 0 -__1_2__-Z__-7_1
I 0- __)__7__4__9__0
:.Z Ai-513 ?74 I
Lf53-Z7&1- 0 0 _ _ _ _ _ __ _ _ _ _
4L#AJ600 -S 7 - Z 2- _____ _ _ _ _ _ _ _ _ _ _ _ _
(6m6,6 -57-- -3 3-1-____~L 4fvj6oo7- 1L
_____ '1fW600-S7- 3j3-14y3 _ _ _ _ _ _ _ _ _ _ _ _
v l e-
I f LJ""6 oo Z -4 3..J' -143_ __ _ _ __ _ _ _
UýSAJv&0 -7- --- - -_ _
"k~O~,' >S~I
TVA 105 75E (EN DES-7-79)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 133"t
k DATA SHEET NO.___
DRAWING OR B/M NUMBERDWG ISSUE DATE
REV. IEXPECTED IACTUAL
3 -1Y-~' 3IL2 Y570 302
______ V<9_ 17 4 F-0 t__
3-/,/'?
v $
FFECTEOUNIT
+~~A I? ~ 9-c5 I
/010
PAGEW
REMARKSI I I I i
3 - ?--?3
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
.......... C EB 03117 9 0
L2J LAN Wats Br Nulea Plat L REPORT NO. WBIIEEB8301W PLAT Wats Br NulearPlan ~UNIT 1and
I There are no procedures for documenting time delay relay setting that are dtrne bypre-op tests.
6 1DATE OlF OCCURRENCE EST (X ). ACT. )12/30/8ý2 SIGNIFICANT CONDITION ACVE;,-SE= TO QUALITY7 1 !.F~QCý DISCOVERY B1ack &Veatch Finding P-19r ', rcF
3j CDE (EN DES-EP 8.01) B0 *RANCH CHIEF/DALE ///
~T1CORRECTIVE ACTION
A special engineering proce'Ure ;i21 be written ctodocumenting the time delay relay settings. 1gi-ve the procedure for
41 - TIE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIRE1,ENTYEDESIGN CRITERIA DOCUMENT NO.. EXCEPTION? REQUjEj:4' YCROIZ ES tC%~ 6 SCHE DULE- I T FTP 7- A
MEDS Acce-d,. KU,
NONCONFO;liMANCE REPORT
.ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
'ORT NO.
It was not recognized that a formal procedure was require~d to docummentche time delay relay settings.
-JTHIS IS A GENERIC CONDITION YS ~ N
ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
Adherence to the special engineering procedure.
A directive has been issued by the Manager of Engineering Design,instructing, all design employees to become thoroughly familiar withand to follow all EPs.
:19 *IOEENONTREVIEW: ~ A&-.--{2:0 LABOR EST. ) , ACT.) I MH 21SCHEDULE EST. (I, ACT. DAYS
ACTIVITY NO. j2 TASK DESCRIPTION DATE iNITIATEOj
REMARKS.
This problem exists on BFN and SQN. NCRs have been written addressing thisproblem for their plants. All 1,.BN schematics have been revie7 ed. Thetime delay relay settings not currently specified have been identified inletter from J. C. Standifer to F. W. Chandler dated April 7, 1983 (1%n? 830427022). A memorandum dated June 14, 1983 (EEB 830614 939), to those listed fromF. W. Chandler details the interim procedure for documenting the tim-e delayrelay settings. Special Engineering Procedures SEP 83-11, issued October i4,1983 (EEB 831014 937), gives the procedures for documenting the time delay relaysettings.
DISTRIBUTION:CONST PROJECT MANAGEREN DES PROJECT MANAGERCHIEF, ESEOFFICE OF CANEB (for Significant NCRs[**MEOS CISINSRS (for Sigjnifi(cant NCRsI'AS>iS (AN T TO THE MANAGER OF QEOC (Quality
and l~ucicar Safety) --for Significant NCRsDISTRIBUTE AFTER THIS SIGNATUREHAN DCARR Y COPY TO NEB LR. L.- Brehmn, IUSD19
[26j ALLEN DE CINCMLEE 4N,0
*BRANCHCHCHFIEOOG_93
7EB '8231019 95?WMEDS ACCESSION NO.
I
FORM 3
WATTS BAR* NUCLEAR ?LANTINDEPENDENT REVIIEWo
10520DIN514910520.92.0000ref: 10520DIN4362
Finding Number /F/11133 /3
0-PL
Comments pertinent to finding:
It was determined during an independent review of NCR WBNSWP8270 that adequa tecontrol room bypass and test indication is provided on 45W600-46-6 R4.
The circuit-test is performed via the periodic blackout-safety injection test.No corrective action is required.
Reference: NCR WBNSWP8270
Program Team Member
OEDC Program Manager
C_ 1Chairman, IgEDC Policy Committei
/(7/F3Date
/Date
Date
(. mc4 e4t.e.' C C
Category 4Class ification: type
I )lac~q.& Veatch -Project Manager
Black'& Veatch Senior Review Team Chairman
12, /7 /1'_3Date
Date
Black & Vac 1 o
* DIVISION OF ENGINEERING DESIGNNON.CONFORMANCE REPRT
MES c.,U ionNo.SWP #82 12 23 0 2L4
C~REpOFIT NO. WBNSWP8270
[]PEANT WATTS BAR N4UCLEAR PLANT 1 uC MI 1&2
jJPREPARERIORGANIZATIONIOATE L. U. Masu ing ill/ SWP/Decetaber 23. 1982
(50 DESCRIPTION OF CONDITION
See attached. 830824F 0053
:6 DTE F OCURENCE1ST~X . AT. I1110/7 [j SIGNIFICANT CONDITION ADVERSE TO CUALITY
61 AT OFOCURRNC ET I 1 ACA 113078VIS NUETIOOOF DISCOVERY hack & Veatch Review F133 *RCCHFAE
UNIOCOOC (EN DES-IF 3.011 E BACC T / r
SCORRECTIVE ACTION
by Isenrandum dated February 14, 1983, from John A. Raulaton to R. 0. Barnett (NEB 830214 275).valve FCV-1-51 is being added to the WEZI PSAR active valve list (Table 3 .9-25ý. Furtherevaluation has determined the circuit for this valve has been adequately ident~if led byEN DES, with a suffix S (TVA Drawing Nos. 4735601-1-series R14 and 45W161t.-lORZ). Therefore,no corrective action is required. Also, it has been determined the valve's controlcircuit does include the required control room bypass and test indication (TVA DrawingNo. 45WJ600-46-6RA). Therefore, no corrective action is required.
Cii12 CORRECTIVE ACTION DEVIATES I 140M A D)ESIGN CRITERIA REOUIREMENT 81
L31 DESIGN CRITERIA DOCUMENT NO. EXCEPTION REOUEST NO.:E41 ICN RE O&MRED 0 yg) Y' 00 NN4 o CEUEIWC
NONCONFORMANCE REPORTCDREPORTINO h11NSWAF21O. -
16 ASSIGNABLE CAUSE: IRECUIRED IF SIGNIFICANTI
ITHIS ISA GENE1RIC CONDITION VIES 0 No IX
gACTION REQUIRED TO PREVENT RECURRENCE. IREGUIREO IF SIGNIFICANT)
[:9. 'INDEPENDENT REVIEW &, 4.
LABOR EST. 1 1. ACT. I I M 14 SCH4EDULE EST. 1 1. ACT.I IDY
ACTIVITY NO. TASK DESCRIPTION L=DATE INITIATED
REMARKS,
NEB has been requested to Initiate corrective action to resolve the NCR.The original NCR is being sent to LED for handling.
DISTRIBUTION I ALLEN QUACTON cOWILMETC(JNSI PROJECT MANAGER I a
0 INDS PROJECT MANAGERIe CHNIEF ESS
0f F ICE OF GA 4NIS Ito. sqwlcwi NCRII- p
ME DSCIS *@RANCN@UtF1OrG. oATIE
ASSISTANT TO THE MANAGER OF OEOG E1ideeotal I'-,' Sef"-do Sepwf mI rig, !kt n ' fR1~ 92
*DSTRIBUTE AFTER THIS SIGNATURE mu Cin& OI4AI4CARAV GOPY TO NEM.LS IIII CESC N
. .1
166(
C ~NCR WBNSWP8 270
Description of Condition (Continued)
The auxiliary feed pump turbine trip and throttle valve FCV-1-51 Is not
included in the active valve list. Also, the valve is powered from tworedundant divisions through a manual transfer device. Based upon the
criteria the circuit should be identified by a suffix S. The design ofthe valve schematic does not include the required control room bypassand test indication.
for detail review see TVA drawings 4SW600-46-6 R4, 45W600-57-26 R1, and45WI614-10 R2.
Applicable violated documents and criteria:
1. FSAR Table 3.9-25, "Watts Bar Nuclear Plant Valve. Required to be
Active for Design Basis Event."
2. FSA.R 8.3.1.4.3, "Sharing of Cable Trays and Routing of Narn-SafetyRelated Cables."
3. Watts Bar Nuclear Plant detailed design criteria, "Separation of
Electric Equipment and Wiring" WB-DC-30-4.
4. FSAR 8...,"Design Criteria" Ea. IEEE STD 279-1971, "IEEE Standard Criteria for Nuclear Pover
Generating Station."
5. FSAR 8.1.5.3, "Compliance to Regulatory Guides and IEEE Standards."
a. NRC Regulatory Guide 1.22 (Safety Guide 22), "Periodic Testingof Protection System Actuation Functions.
b. NRC Regulatory Guide 1.47, "Bypassed and Inoperable StatusIndication for Nuclear Power Plant Safety Systems."
c. NRC Regulatory Guide 1.106. Rev 1. "Thermal Overload Protectionfor Electric Motors on Motor-Operated Valves."
6. NRC Regulatory Guide 1.70, Rev 3, "Standard Format and Content of
Safety Analysis Reports for Nuclear Plant" Section 3.9.3.2.
167
'U' 7'..]ý- =- I
EN DES
NONCONFORMANCE REPORT COMPLETION VERIFICATION SHEET
NCR NO. WBNS1JP8270
SIGNIFICANT REPORTABLE STRIDEYES a No M YES a NOB T ESO o 0
A. Nave any analyses, contracts, memorandums, etc., requiring EN DES work beengenerated? Yes M No 0 If yes, list in (C) below.
3. Nave all ECNs related to the NCR been issued?N/AU9 Yes 0 No 0 If yes, list in (C) below.
C. Documents related to the NCR (ECN, analyses, memos, contract go.., etc.)
STATUSREF OR IIDS WORKINGCACCESS. NO. (see (M below) CO1112ETE
Memorandum from J. A. Raulaton to -NES 830421 263
L. H. Mills dated April 21, 1983
D. Is action by organization outside EN DES required? Yes 0 Nos., -
Organization tracking No. (NCR, QCIR, etc.)___________________
1. U&s all necessary EN DES information been transmitted to an organizationoutside EN DES to enable the completion of work required?Yes 3 No 0 N/A 0 If yes, list in (C) above.
F. If any document listed is (C) above is indicated in the working status block,item 26 on the NCR cannot be signed.
G. Is all EN DES action complete? Yes U go.0
N. Remarks:
- ~ Verified By tb to
Ppag 1 of I
FORI 3
WATTS BAR NUOCLEAR PL.ANTINDEEN'DENT REVIEW
1L0520DIN527010520.92.0000ref: 10520DIN4112
Finding Number / F/ l/ 3/.5/
Co~ents pertinent to finding:
See attachment.
No corrective action required.
/
Program Teaml~ember
OEDC Program Manager
Ch irman, OEEDC icy Co~ittee
/Date
Black & Veatch
Classification:
Se-w-
Type Category /
Date
Black' Veatch Seni.or Review Team Chairman
"9
Evaluation of the TVA Form 3 Comments
F135
The TVA Form 3 information has been reviewed, in light of the originalFinding and the various discussions appended to it. Individuals in theB&V Control and Electrical Department were contacted, and their opinionsutilized in evaluating this Finding. The specific conclusions reachedare as follows:
1. The basic issue originated with a literal interpretation of thecable tray fill discussion in the FSAR and a conservative design ap-proach on the part of the reviewer. This posture raised severaltechnical issues that required responses.
2. The TVA approach to calculating cable tray fill using nominal ratherthan actual or worst-case cable cross-sectional areas is technicallydefendable. The FSAR clarification initiated by TVA is consideredappropriate.
3. The design of tray supports on the basis of 100 per cent fill isconservative and satisfies the structural concerns raised by thisfinding.
4. The TVA position on ampacity is reasonable for the particular cablesand service in question.
5. The fire hazards analysis using a 100 per cent fill and the upperlimit heating values for the combustibles is considered to beconservative.
Based on the above considerations, this finding has been reclassified asresolved.
Black & Veatch Finding F135
Watts Bar Nuclear Plant
Black & Veatch Comment No. 1 - The reference to voltage level 4 in the B&Vcomments dated December 13, 1983, should have read, "level 3."
TVA Response - No response needed.
Black & Veatch Comment No. 2 - The cable areas utilized by TVA were notconservative in that they were smaller than the actual cable utilized. Ona worst case basis, the computer program could be indicating a 60-percentfill when in fact actual routing exceeded 100 percent fill.
TVA Response - TVA is aware that the largest possible cable area may nothave necessarily been used in the computer cable routing program fordetermining tray fill; however, this lack of conservatism here iscompensated for in other aspects of the design:
A. No control (level 3) tray would ever contain a single type of cable.
B. Allowable conductor ampacities used by TVA are based on Insulated CableEngineers Association (ICEA) standards which Assume a 100-percent loadfactor; level 3 cables are for control functions that convey inf or-mation or intermittantly operate devices controlling power switching orconversion equipment.
C. The composite weight for the support design is based on 100-percenttray fill. A conservative loading of 45 lbs/ft is used as the deadload for an 18-inch wide tray.
D. The fire hazards analysis is based on a combustible loading of 100-percent tray fill. The type cables used at WBN have a range ofcombustibles from 6000 to 14000 BTUs/lb; TVA conservatively uses the14000 BTUs/lb factor.
TVA specifications require cables for WBN to be manufactured following theguidelines of ICEA S61-402 and ICEA S66-524. These standards allowtolerances in the insulation and jacket thicknesses. For this reason, TVAuses nominal cable ODs in determining tray fill; a revision to the FSAR hasbeen submitted (EEB 831116 920) to state nominal ODs are used.
In the description of B&V Finding F135, five cable types are tabulated ashaving ODs in the cable schedule input data which are less than thoseobtained from vendors data.
2
Black & Veatch Finding F1354Watts Bar Nuclear Plant
TVA OD Used OD FromMark No. By TVA Vendor Data % Variation
WHC .393 .399 1.5 %
WHB-1 .309 .404 23 .5 %WHJ .694 .698 0.57 %WHD .428 .444 3.6 %WILE .510 .530 3.8 %
From the % Variation column in the tabulation above, the differences in
four of the cable types can be attributed to the tolerances allowed by the
ICEA standards. The greatest disparity in OD occurs in a WHB-l type
cable--a 2C No. 14 AWG; this difference is attributed to TVA using an
equivalent nominal diameter for a flat oval shaped constructed cable,
whereas the diameter obtained from vendor's data obviously involves cables
constructed in a round shaped configuration. Due to the economics
involved, most vendors supplying WHB-l type cable for WBN used a flat, oval
shaped construction.
For each voltage level, TVA has assigned "node points" along the tray
systems. The computer cable routing program keeps a "running total" of the
cross sectional areas (csa) of the cables passing through any given node
point and compares that csa with a preassigned value of tray fill; when the
running total for a given node point reaches this preassigned value of tray
fill, the computer cable routing program will not route additional cables
through that node point. However, this does not necessarily mean that
additional cables will not be added on control or instrumentation trays.
In fact, if a field inspection reveals that additional cables can be added,
an adjustment may be made in the computer cable routing program (depending
on the need and the circumstances) to allow additional cables to be routed.
The preassigned value of tray fill referred to in the previous paragraph is
60 percent of the available cross sectional area for level 3 trays. ThiLs
fill value is simply a "check point" for TVA's use in evaluating future
cable routing activities in the respective tray. It is not the criteria
on which the tray support system or the fire protection requirements have
been based; the criteria for these two design considerations are described
in TVA's response to item 4c and 4d.
In conclusion, TVA uses nominal cable ODs in lieu of trying to use actual
cable 0Ds which vary within the tolerances of the ICEA standards and from
one vendor to another. Any lack of conservatism which might occur is
compensated for in other design aspects of the tray system.
/7Z,
3
Black & Veatch Finding F135Watts Bar Nuclear Plant
Black & Veatch Comment No. 3 - B&V could support the TVA contention
relative to updating the computer input data had the original estimatesbeen conservative.
TVA-Response - After thoroughly reviewing the requirements associated withthe cable tray system and the cables routed therein, TVA will only updatethe computer input data when it is determined that an unsafe conditioncould result; changes have been made in the past and will continue to bemade in the future on this basis.
Black & Veatch Comment No. 4 - The basic concerns with this item are:
(a) meeting FSAR requirements(b) ampacity - if overfill occurs in power tray(c) tray dynamic response and support loading - if designed for 60 percent
fill(d) fire protection -if analyzed for 60 percent fill
TVA Response
(a) A change to section 8.3.1.4.5 of the FSAR has already been submitted(EEB 831116 920) as a part of the FSAR verification process to pointout that nominal cable ODs have been used in determining tray fill.Statistically, cables should be found with ODs below TVA's nominalvalues just as often as they are found above these values. Therefore,the intent of the FSAR requirements have been met.
(b) As noted in Black & Veatch comment No. 1, the cables referred to inthis finding are control level cables (level 3). These type cablesare used for control functions that convey information or inter-mittantly operate devices controlling power switching or conversionequipment. Therefore conductor heating is insignificant and is nota variable of tray fill.
Level 4 power trays are limited to a maximum fill of 30 percent of thecross-sectional area of the tray. Cables are selected from TVAElectrical Design Standard DS-E12.1.2, which has ampacities based onICEA standards. ICEA Standard P-54-440 requires ampacities of cablesin trays to be limited to 80 percent of the ampacities of cables infree air as taken from ICEA P-46-426; the resulting ampacities arestill not as conservative as those in DS-E12.1.2. Since the ampa-cities have been calculated assuming 100 percent load factor and nospacing of the cables in trays, no significant conductor heatingproblems would occur, even if the tray fill did slightly exceed the30-percent fill criteria due to TVA's use of nominal cable ODs.
'7-3
4
Black & Veatch Finding F135Watts Bar Nuclear Plant
Any lack of conversatism in ODs for cables routed in level 5 powertrays will likewise have no significant impact on their aanpacities,for the same reasons cited in the preceeding paragraph. It shouldalso be noted that TVA does not allow cables smaller than a 2/0 AWG inlevel 5 applications, regardless of the load requirements.
(c) Tray and support loading are no designed based on a 60-percent fillcriteria; instead, an 18-inch wide tray (including the tray, fittings,cable coatings, and cables) is assumed to be 100 percent loaded andhave a composite weight of 45 lbs/ft. This assumption is made regard-less of the voltage level or the percentage fill on the tray. Thetray support system is designed accordingly.
(d) For the types of cables used at WBN, the insulations and jackets havea range of combustibles from 6000 to 14000 BTUs/lb. The fire hazardsanalysis conservatively utilized the 14000 BTUs/lb factor for the fireloading of combustible cable materials, which assumes a 100-percentfilled cable tray.
063339.01
FORM 3
WATTS BAR NUCLEAR PLAINTINDEPENDENT REVIEW
10520DIN515010520.92.0000ref: 10520DIN4079
Finding Number /fF /11 37 /7
C
Comments pertinent to finding:
A review of all safety-related motor-operated valves of 1/2 hp or less wasperformed to check for compliance with Design Standard E9.2.1. All correctionsresulting from this review were made on EGN 3904 for the following drawings:.45W751-4 R15, 45W751-5 Rll:, 45W751-10 R13, 45B1767-2A R8,.45B1767-2B R8,45B1767-llA R7, 45B1769-2A R8, and 45B1769-2B R9.
All remaining safety-related loads powered from motor control centerinstantaneous only breakers were reviewed to check for compliance with DesignStandard E9.2.1. Thirteen breakers require replacement and 385 breakers willbe reset. ECN 4251 was issued to make these corrections with a scheduledcompletion date of December 1983. All designers and checkers have beeninstructed to strictly adhere to all criteria used to prepare EN DES drawingsas'part of the ongoing engineering procedures training and utilization programinitiated by M. N. Sprouse;
References: ECN 3904 and6 ECN 4251
Program Team Member
OEDC-Irogram Manager
Cha ~~a, OEDC Pol Committee
Date
'I/7/tDate
Black & Veatch
Classification: Type SCategory______ ____
Black & Veatc Seio eview Team Chairman
2ý/7 t-Date
Date
MA'
TENNESSEE VALLEY A*DIVISION OF ENGINEEF
TO:. Construction Proje
ENGINEERIN'G CHANGE NOTICECOVER SHEET WBP '83 0715
(BEFORE ISSUANCE OF OPERATING LICENSE)
UTHOR ITYIING DESIGN ECN No.
ctManaaer \Valts Bar Nuclaer Plant, Spring City, TN
From: NPD Project Manager 3v
DATE 9 1
Was IJ Analysis Required: Yes _ No x"
42!. Prepared by
Z7, Released:Project Engineer Dafe
Project WATTS SOl -NUCLEA~R PLQA1-:r Affected UnittsL..
System or Feature_ (3) (47),~Reference &Description of Change AM 3 UT ARF~AKER S&FTTJA/r; ULZTI ZIN& TI/F
r-RITER1p9 POR D)ESI&N !;rANI)ARD E9.2.1 PER? BLqe1CK -'V6,47re c1N-DJNQ A137
Date
7, 8,
DRAWI NGS OR B/M'S INVOLVED:
I' (Data Sheets Required)
CIVIL ENGR SUPPORT BRANCH 0
.,ELEC ENGR SUPPORT BRANCH ND
,,TMECH ENGR SUPPORT BRANCH MD
#~NUCLEAR ENGR SUPPORT BRANCH &-Q-.
-ARCH. SUPPORT BRANCH L.SPECIAL DESIGN PROJECTS p
'.NUCLEAR PROJECTS DESIGN GROUPS_&LcivilElectrical E2 E
~2/Mechanical
PHYSICAL WORK MUST BE DONE BEFORE:Pro-Op Ist Fuel
Test Load
Unitfsi V
Unills)_______
DATE
Yes Dateor Data. SheetNo Available
q-7-831ý0
Yes aSUPPORT BRANCHESAPPROVAL REQUIRED
EC, sr for s art ranch review:EC
N/ 14jSupport r~ Br Chae
Electrigal Support Br. Chiief Date
M~hiJ~ r r. Chief -. Date
Chidf Nuclear Engineer DateN/f dd- ,ý
Arch. Support Br: Chief Date
Required for PSAR or FSAR
Required for Preoperational Test:
If Yes. Test No._______Vendor Backcharges Involved
Seismic Analysis Required
Nonconformance Report Required
QA AppliesSecurity System Modified
Human Factor Review Required
Pipe Rupture Analysis Required
Vendlorb involved:_______
Yesor No
NO
NO
1 7•5
I
TENNESSEE VALLEY AUTHORDI VISION OF ENGINEERING DE
ITY
SIGN ENGINEERING CHANGE NOTICE O 3101/
Watts Bar Nuclaer Plant, sp ý E NO.
NPD Project Manager \j20 1 C 2 -K
- 7-., ~-9-Relea, By:
BRANCH[13
PAGE LL7.61{1ý
Preparing Section MEDS Accelssion No. MEDS Accession No.
__ __ __ ___,_ R
Prepared 0~~' WBP '830715 532 4RBy: UMQ~~s e. A/,f D--ats _____________
Total Pages (RO): (g)R 5
SectionSupervisor:
Staff E ng. or R RArchitect: 2 64
GroupHead: I6 jj q R R
Sr. Chief/__________________ ____
1SDP Mgr.:SCOPE
Project Wd T 75 8,9 9?A NUeLEP,9' Pld N T Affected Units
System or Feature ('8 ) (( 7)ZýRfrne&Description of Change _AOTu 7- 8A'g'J /Fr 7-rdc uL T-iL it2J( TwE/ CR/7TFP).4
FOR Dr'UcAh S TWUNPAD 9. 2,1
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
REV. DATE PRE. SECT. GROUP BRANCHf ECN D.P. DSRPINORESONTOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR. DSRPINORESONPAGES
1~___ A10N PR REGUJI?6t, OW~~
Field Materials as follows:
Additional Intfrmalion: DA rr 9- 97 -Y3
C / ,1a eSh- 04
VýýPDProject Manager51,10,
tW~NkSSEF VALLEY AUTHORITYo:vISeo14 OF ENG11NEERING OE51GN.
A77~PACE jJENGINEERING CHANGE NOTICE NO. 3 9I'
DATA SHEET NO. I
AFFECTEDI D WG ISSUE DATE LIUNIT DRA WING OR B/M NUMBER REV. EXPECTED IACTUAL 4/REMARKS
r [,,~ I S~.)-X~I-..
J 51/Z51 -5 I
112 Y5N75 -1
Atg) 7 7--2-I - 1ILI'i -
I -5-Z
U~-~- (
__---_WON
VA 105 75 C (EN DES-2 -8 3 ) ENGINEERING CHANGE NOTICE /7
COVER- SHEETWBP 31~51(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
TO: Construction Project ManagerWatts Bar Nuclear Plant, Spring City TN
ECN No. q25/
From: NPD Project ManagerSWP 204 GB.K
DATE
Was IJ Analysis Required: Yes _ No
Prepared 'by
PoetEngineer
W8P - ISection
Released:
Project Wqrrs Z3Aqe VvciJ-RxR~
I _I~NPD NPr ýject ManagerSCOPE
FZ A AJ I'
Section Leaer
Date
Affected Unit(s) 142(
System or Feature e-1/-45 1 /A '1904V Li t7AM C6$Jr$9L / S
Reference & Description of Change ON/ ALL. C L $95S /9 7efý CIMAISS 11V.7.i14WAW45
-ADD 8K)? CA1T-4Z,4 NlA~d~,Ie AM t h~ A 7-6 -SiJ';e L/A/ZSa
(,REF )3LAC9 AA1P VSA'veM PVOIJ4 F ./37)(iA e',)DRAWINGS OR B/M'S INVOLVED: Yes Date [CIID~flOr DDAMIPUCC' VoKsM
(Data Sheets Required)
CIVIL ENGR SUPPORT BRANCH 414
E-LEC ENGR SUPPORT BRANCH
MECH ENGR SUPPORT BRANCH __
NUCLEAR ENGR SUPPORT BRANCH 410
ARCH. SUPPORT BRANCH t
SPECIAL DESIGN PROJECTS__
NUCLEAR PROJECTS DESIGN GROUPS&&.Civil A,/0Electrical FEZ ____
Mechanical
PHYSICAL WORK MUST BE DONE BEFORE:
Pre-Op 1st FuelTest Load
Unit(s)
LUnit(s)_______
or Data SheetNo Available
-4
APPROVAL REQUIREDECN is ready for support branch review:
>JPD Project Manager
YEC S
1-93-83Date
__Approved:
Pc Su ort Br. Chief Date
Electrical Support Br. hief Date
Mechagical Support Br,..hief Date_ 4 Z/7234 I ý /-E -;
Chi~ef 'Nuclear Ep~ineer Date
Arch. Support Br. Chief Date
Yes or NoRequired for PSAR or FSAR No
Required for Preoperational Test: tv 0
If Yes, Test No._______Vendor Backcharges Involved Nd
Seismic Analysis Required YA6S
Nonconformance Report Required NO_______
QA Applies YES5
Security System Modified N4O
Human Factor Review Required NO
Pipe Rupture Analysis Required NO
Vendor(s) involved: ____________________
cc (Attachments): ft - Yes Sk
I
X r'-l 2- (AIJZL Z 4,19D e,0A0A'29Vr
FORM 3
WATTS BAR'NUCLEAR PLAN'TINDEPENDENT REV=!
10520DIN509410520.92.0000ref: 10520DIN4032
Finding Number /fF/ 1 /3 / 9/
R-PL
Comments pertinent to finding:
ECN 3306 has been closed. The unissued copy of ECN 3.306 has been removedfrom the file.
Reference: -EGN 3306
S/Y6LProgram Team Member
/ (~2v54~//OEDC Program Manager
Date
I 'ate
DateChairman, OEDý)Policy Committee
Black & Veatch
Classification: type
Z164
R F, aIBlack & Veatn~ Senior Review Team Chair
le Category__________
Date
lan Dateý
-, 0) V f Ihl ý, ýel
kcý I F- ; ýýIrk r. (-, , ,
TV 155C(N ES1-8)ENGINEERING CHANGE NOTICE.4.-.
COVER SHEET. w(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
'82 0407 5 17
ECN NO. 23_0(
To: Construction Project Manager
From: Design Project Manager -
DATE
Watts Biar Nucler M-1 t=n"t ~.:ift"
3iv~r iA~~Lv" t
APR 071982Was IJ Analysis Required: Yes
J .L.8uf 6Pr e b .
Project Engineer
S'wPto-e /-=
Released:
~-Ac~e~-A 7 ,¾6
Design Project Manager
Seeltion Le~d4r?"'
Date
SCOPE
Project IL)frfl 2PA 1UUC(,&,4,e P&/-&V7- Affected Unit(s) t2
System or Feature LtL IJ1 SWITC14 MfW?)/,C/ Ci97-'A/Reference & Descripti on of Change -S 7-0• 0/ uJ's/4 Pb6meAli'r 7;Al6c/4v
0 7LTUA)6,0 W A,-C- BiLI-AJTA/711 e&?2-4o A:AJO~S-~AP
DRAWINGS OR B/M'S INVOLVED:
(Data Sheets Required)
Yes Date Branchor Data SheetNo ----- Available-
Thermal Poe !ne f rjc
Electrical El ES
Mech
Analysis
Arch, Hydro, & Spec Proj Eng & Des
Arch
Civil
Electrical
Mech
'swP
PW-YSCAL WORK MUST BE DONE BFORE:J
Pro-Op 1st Fuel 1%Thrm Commli letTest Load Power Oper'n Refuel
Unit(s) VUnit(s) '-
Thermal Power Engineering Branches Yes or No
Approval Required - .'- -- - -1 .. .ý y
ECN i ~ r Tb~yf~review:
ei 6g Proj ect Mai~XDate
Approved:
I f/A _
TPE Civil Bil Chpf Date
TPE Electrical Br. Cd~ef Date
TPE MechiticoK9"'. Chief Date
gineerDate
Ysor NoRequired for PSAR or FSARRequired for Preoperational Test:
It Yes, Test No. _______
Vendor Backcharges Involved _________
Seismic Analysis Required PJNonconforhiance Report Required QtQA Applies YES_____
Security System Modified 7Vendor(s) involved: W EST Ir'J(, & -n'u S r
CC (Attachments): Yes I Chief. Nuclear Engine4)Chief, Arch itect i~ra)l- Design Branch, W4C126 C-K Chief, Mechanical Eng
Chief, Clvii Engineering Branch, WgD224 C-K Chief, Mechanical EngChief, Civil Engineering & Design Branch, W3C126 C-K Chief, Quality AssurarC*%ief, Electrical Engineering Branch, W8C126 C-K Manager of ConstructiChief, Eeictrical Engineering & Design Branch, W213224 C-K Chief, Cost planning aMEDS, 100 UB-K Plant Superintendent
Sr. W10C126 C-Kineering Branch, W7C126 C-KInearing & Design Branch, 102 SPT-Kice Branch, W11C126 C-Kon, E7B24 C-Knd Control Staff, W12C74 C-K
- - 11
Section
FORM 3 10520DIN525210520.92.0000ref: 10520DIN4113
/ FI
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number IF /1 /4 /0 / RiC
Comments pertinent to finding:
During-the time of the initial Black and Veatch review, the motors for the motor-driven auxiliary feedwater pumps was considered to be located in a harsh environment,since that time more detailed environmental analysis has shown that these motorsare located'in an area in which the environment is not significantly differentthan the normal/abnormal operating environment used in the procurement documents.Therefore, qualification by analysis was selected to meet NUREG-0588 requirements.This analysis is attached.
Program Team Meb er
OEDC Program Manager
.ttee
Li'il-Date
Date
Date
Black & Veatch
Classification:
Black-1
Type k2 Category _j-
yatc oetMan ager
/
B1lIack &V t h , 2i Rview Team Chairman
Date
1ate
.Finding 140
1. The auxiliary feedwater pump motors covered by this finding areParsons-Peebles 600 HP, 6600V, 3-phase 60 Hz motors, Frame T-4007J. They are located in the auxiliary building room No. Al,elevation 713', column: (A-A4 -(S-t) unit 1, (A-A13) -(S-t)unit 2. The motors are supplied in redundant trains for eachunit. One pump/motor can fail under single failure criteria andthe systems satisfy its safety requirements. The remaining motormust operate intermittently for a maximum period of up to 30 daysto meet TMI postaccident cooling requirements.
2. The motor components/subcomponents subject to aging degradationare the insulation system and the bearing lubricating oil.
3. The motors are required to operate and not fail in the followingenvironments:
Normal (Abnormal) Accident
Temperature 1040F (1100F 1060FPressure ATM (ATM) 14.43 PSIARelative Humidity 80% 2(90%) 100%Radiation 5 x 10 rads (N/A) N/A
(40-Yr TID)Flooding N/A N/A
4. A summiary of analysis of the effects of temperature, pressure,relative humidity, and radiation is discussed below.
Temperature - Motors are equipped with a class F insulation systemwhich per NEMA MG-l allows an overall winding temperature of1450C (1050C rise plus 4000 ambient). Motor test reportsshow a maximum rise of 57.40C plus maximum ambient of 43.3 0C(110 0F) for an overall winding temperature of 100.70C. Thisis well below the allowable continuous temperature level of1450C; moreover, the motors which do not operate on a continuousbasis but only during the loss of the main feedwater supply have adesign life of 25 years assuming normal continuous operatingconditions. (See ParsonPeebles Electric Products, Inc., letterdated January 21, 1983 MEB 8301256 548). With operatingtemperatures far below the normally continuous temperatureallowable, the insulation life should meet the 40-yearrequirement.
Pressure
The pressure transient existing during an HELB is postulated toinduce an approximate 0.03 psia positive pressure spike from anormal atmospheric pressure of 14.4 psia. This spike peaks inabout 0.5 second and then returns to normal in about 20 seconds.Since the motor is not sealed but has air inlet and outlets thatallow the free exchange of external air, the pressure transientwill be substantially equalized across the motor enclosure. Theheavy gauge materials which make up the motor enclosure should be
more than adequate to withstand this minor pressure change. Alloil coupling to the bearings are flanged fittings and do not offeran orifice through which the oil could be forced out due to thepressure difference. Therefore, the pressure transientexperienced during an HELB will not adversely affect the motor'soperation.
Relative Humidity
These motors normally operate in an environment of 80-percenthumidity or less and under abnormal conditions up to 90-percenthumidity. Years of motor operating experience and informationfrom motor manufacturer's attest to the fact humidity at these lowlevels will not cause the motors to be functionally inoperable nordegrade motor performance. Moreover, space heaters are employedduring motor nonoperation to prevent condensation. During a HELBhumidity can reach the 100-percent level. However, during thiscondition, the motors will either have the space heaters energizedor will be operating so no moisture can condense on the windings.Consequently, the humidity levels encountered by these motors willnot be detrimental to motor operation or motor life.
Radiation
The maximum total integrated dose is 5 X 102 rads. This isconsidered negligible. All materials found in motors to dateexhibit radiation damage thresholds above this level. This levelof radiation would not degrade or otherwise cause the motor tofail.
5. Maintenance, Surveillance, and Testing
En order to preserve the capability of the motor to perform itsrequired safety functions, a program including maintenance,surveillance, and testing has been established. Included in thisprogram are the following:
a. Each month a tni-directional vibration reading (horizontal,vertical, and axial) is taken to check motor balance, shaftdistortion, etc.
b. Bearing oil samples are taken every six months and the oilanalyzed to ensure that no breakdown has occurred in the oil.
c. The motor is physically inspected annually for any possiblesigns of deterioration, clogging of air vents, mountingintegrity, etc. Cleaning of air vents or other necessarymaintenance is peformed at this time.
d. The motor winding is tested annually to establish itsintegrity and detect changes which could be indicative ofinsulation deterioration.
E64011.06
Evaluation of the TVA Form 3 CommentsF 140
The information submitted by TVA on the environmental qualifications for
the Auxiliary Feedwater Pumps indicates that the units have been evaluated
and were determined to be acceptable by TVA.
Although definitive test results have not been provided, the discussion
of the various environmental consideration suggest that appropriate
attributes have been considered by TVA in arriving at the conclusion.
The maintenance, surveillance and test program indicates that subcomponents
(ie. bearings, insulation, lubricant, etc.) which are subject to degradation
will be monitored and appropriate action taken.
This item is considered closed.
FORM 3
WATTS BAR'NUCLEAR ?LANTI.NDEPENDENT ELEVT3W
10520DIN508310520.92.0000ref: 10520DIN4264
Finding Number /F /1 /4 /1/
R-PL
Comments pertinent to finding:
This discrepancy was a drafting error. A 9-conductor cable does not contain aW/BL color-coded conductor. The correct color code is WIBK. The fieldtermination was determined to be correct. This error was revised on connectiondiagram 45W1769-6 R3 under ECN 3650. All corrective action is complete.
References: EGN 3650 and NCR WBNSWP8267 Rl
'Date
Program Team Member
OEDC Program Manager
Chair k, OEDC Po Commnittee
Black & Veatch4~~r ~
Classification: type
9 *
Category If
B1,ack &ý Veatch Senior Review Team Chairman
Date
Date
/ ~5 a&~&Veatch Project Manager
/81&ENGINEERING CHANGE NOTICE
COVER SHEET(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERIN4G DESIGN WisBr~ ~ $~i ~,T
To- Construction Project Manager aiB4
From: Design Project Manager
DATE JAN 2 01983
il Id U120
ECN NO. s -
Was 1.1 Analysis Required.- Yes _ NoV'!:
ý919'Ese. FIsHE
Project EngirmwReleased:
SCOPE
Project WATT SBAO NUCLE99 PLAA/Z A
SystemorFeature (3) Avyw)iMR FtEDWAATER SY57-EM
Sectio Utrder
ager Date
ffected Unit(s)
NCR W6 4P64
Referencee& D. scr ItIV notChange COR&UT7 DRAW)AJ4S PER SLACK I V9A74!dC.
F/ND)JW~12Z;/ - I -, ~ ~
DRAWINGS OR B/MS INVO es,
(Data Sheets Reu
ENGINEERSO W
G Nule.
Electrical E2 YEMech
FOSSIL. UPORO A SPECIAL PROJEMT DESIGN
SPECIAL DESIGN PROECTS
ARRI TECTINNAL 9I a
WBP '830826 539
june- I~2 I I - I I
CHIEF. ARCIIITECTVIAL 9UPOT INMCN. VaCuA c-CHIEF. C IVILt Ell GICESIGE RAC.wpm* C-9CHIEF. ELECTRICAL EAG INI~ G SalCH. VaC1lA C-KCHIEF, ECHANICAL. ENGiUEELIRIG 241ANCE, ViC12 C-9CH IEF, N.UCLEAN ENGINEER. VIOC1.S C-4CH IEF. QUALITY ASSURANCE INANl31. S1" "1"-
Date BranchData SheetAvailable
1116IuEENsue SNPPORT &NmCN0E3 sVe
Approval Required
ECN;7aVnch review:a_- if-_Sr
4 eign Projec aager-Dt
Approved:~..
EAX CIVIL $I- CMIEF Date
ERS uLCcTra St. call/ Date
Cliodf Nuclear Engineer Date
________ Required for PSAR or FSARRequired for Preoperational Test:
If Yes, Test No.Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report Required
1St OA AppliesZIue Security System Modified
Yes or %/1
NO0QM1
Vendor(s) involved:
CHIEF. COST PLANINGII AND CDITOOL STAFF. WiZae4 C-aCHIEF. SPECIAL DESIGN PIOJECTS, W2D224C-MNAGAER OF CD11S1IUCTID11. E7324 C-KPLANT 31PEISITUDENTNED$. WSWI C-9
SWP 204 GB-K
&JIt-A l~'.., , Z.~ I
-A-D
TENN~ESSEE VALLEY AUTHORI~DIVISION OF ENGINEERING DESI ry ENGINEERING CHANGE NOl
Pesign Project Manager SW? 204 CG"-WIIAN ~o18
rICE NO. 3BPS RANCH 19
Released By: 91 z-r AG LnProject Manager
Preparing Section - MEDS Accession No. ME xAcession No.-E2 -RISWP R8 2~ _______
Prepared 0 u30120 52 4
Total Pages (RO): R ~Section3 0214 544 5
Staff Eng. or oArcitct 2 SWr 1u3038 5226 _ _ _ _ _ _
Group RI RHead:3, 7Branch / _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chief: Dfa teSCOPE
Poject WAT-TS BAR NQC LEAR PLýAhWT Affected Units
System or Feature (32 4UXI)LAIKY FEPDWATE-R SYSJ7FM
Referece &ODescription of Change (ýQRREtCT DRSAW)NGSc PERE I3LOC& I-YEVF4T-d
igG g326"9t -3
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE- SECT. GROUPBAC ECN D.P. TOTALNO. ISSUED IPARED SUPV. HEAD CHIEF CLER MO.ESCR IPTION OF REVISIONPAE
7-&' ?;ce w- c9 19// z )eLa D r,5gD 2 Dw&e- 1 DD~rZ .6Pw6
3 :-2 ec4o--a -,D PELr7 /& o pw6 s 2
FitýA irials as follows:N PR RElp IAddlII Information:
GULEF. C03T PLANNING AND coarvaL STAFF. WlZSC74 PLANT SUIPERINTENDENTGUEF. £AMATECcThAL SUIPPORT SRARCa. W4C12 C-K CONSTRUCTION PROJECT MANAGERCNIEF. CIVIL ENGINEERING BRASCA.WW90224 C-9 MRM3. 640I CM-CCNIEF. ELECTEICAL ENGINEERING 335500. WOC126 C-9 ~l 60CTCNUEF. SPECIAL DESIGN PROJECTS. W20229C-
TENNESSEE VAL.LEY AUTHORtITYCovissc OF ENGINEERING DESIGN-
ENGINEERING CHANGE NOTICE NO.______DATA SHEET NO. I.. PAGE
DIVISION' OFF ENGINEERIING DESIGNNON CONFiOHM AIN
viJBP '83 0818
Wl REPORT NO. i.~s: 8~ 1"i,2 67 R
,N T W~ATTS BAR 1NUCLEý%R PLA2'NT UNIT___ ______
PRFAER/ORC-ANIZATIONIDATE J. D. Co! 1in s/X5BP/Aug-ust 17, 1983
DESCRIPTION OF CONDITION
Electrical drawing discrepancies have been identified on the logic, control,
scnemnatic, and connection drawings for the auxiliary feedwater system as a-result of the Black and Veatch'third party independent review. The Blackand Veatch finding -numbers are:
F101, F102, F103, F104, F105, F106, F107, F110, F11l, F114, F115, F116,FlU7, F123, F124, F127, F130, F131, F141, F802, F803, F804, F805, F806
Approximately 24 drawings have been identified with minor discrepancies.
DATE OF OCCURRENCE EST IX), ACT. ( ) 198SIGNIFICANT CONDITION ADVERSE TO QUALITY
-- 'HOD) OF DiSCOVERY Third Party ReviewYE NO_f . D (ENDES-P ~BRANCH CHI EF/DATE
'I COP:RECTIVE ACTION: The minor electrical drawing discrepancie .s identified by Black and Veatchhave been corrected on the following ECNs and FGRs:
2816 - F123, F1243647 - F10i, F102, F103, F104, F106, F107,3650 - Fill, F115, F117, F127, F141, F803,E3458 - F105, F805E3508 - F110, F116, F802, F804
F114, F130. F131F8 06
ACTIN DEIATES FROM A DESIGN CRITERIA REOUIREMENT YESD[ NO L'
050
DESUIGN CRITEI HA DOCUMEN7 NO).
ECN REQUIRED [I YES NOD ECNNO 2816, 3647, 3650 '1SCHEDULE IMPACT r _A F
NONCONFORMANCE REPORT
FCAU)SE. (REQUIRED IF SIG'JIFICA'NTILC~
jJTHIS IS A GE-NERIC CONDITION YES FX NOQ[
SACTION REQUIRED TO PREVENT RECURRENCEý (REQUIRED IF SIGNIFICANT)
01ASREST. ( X), ACT. I 1 20 MH 121 i SCHEDULE EST. (X 1 ACT.
272! ACTIVITY NO. FLCBeo 31, TASK DESCRIPTION EN _L4 DATE INITIATED *S,
~2IREWMARKS. * CN 2816 -Act. No. DZ85-E2"81669 Date 11/29/82EON 3647 -Act. 'No. D 785--E364725 Date 01/17/83
EON 3650 -Act. No. DZ"85-E-3650'R6 Date 01/28/83
Th~is NCR supersedes NCR WBNSWP8267 RO.
1271 DISTRIBUTION:ALENDSCTOCMPT:CONST PROJECT MANAGER J. D.. Collins, 5100 MIB-K 21 ALE DSATINCMPEE
[21 EN DES PROJECT MANAGERCHIEF. ESS
OFFICE OF QA_______________NEB (for Significant NCRs)-,. EIDS cis 2.'AANCH CHI /IORG.
NSRS Ifor Significant NCRs)
ASSISTANT TO THE MANAGER OF OEDC (Quality '3 0 1 0and Nuclear Sal ary).-for Sioniiicant NCRs W P 0
DISTRIBUTE APTER THIS SIGNATURE ________________
HANDCARRY COPY TO NEB-NLS MEDS ACCESSION NO.
FORK 310520DIN527110520.92.0000ref: 10520DIN4307
p WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number l/4-
conts pertinent to finding:
The problem identified by Black and Veatch finding F142 was resolved according toNCR 4542R, copy attached. Relative to Black and Veatch concern of generic impli-cations, the attached evaluation sheet verifies that a sample of applicable Q. A.reco-rds was performed and that no additional errors concerning documentation.existed.
Program Team Meunty KJ Date
bate
Bate
Black & Veatch 7A 4t, ~4ft~u6"jtvd
ýClaasification: Type Category /8
DateB1tiýVý c ProjectMnaeBlack & Veatch Senior Review Team Chairman
/
~ZTUY(i~ (~jo
OEDC Prodgram Manager
Ch irman, OED^ olicy Committee
DIVISION4 OF CONSTRUCTION4
156b NONCONFORMING CONDITION REP,
IA. Item and CAG Dqtcr~pt~o. and Atpoa,enrI Caue
The termination information on the doc~umentat ion
for cable l-5PP-3-662-B was in error and was notupdated to reflect the actual configuration. The
cable is installed correctly.
.'t.Lacih-nen. A
FI T
1~ N~ io 4542R P,. 0
IC. REF, NR o,
AUDIT No. N/IA
10 LANT .
016EUNIT:1
I F. SYSTEM: 3IG. ASNE CODE r- Yes U No
IN4 CCNTRACT No..: / _
It. INITIATING EEUUNIT _ --
I 1.. Vendor Name N/A ____-Addrets (City and Stjf'L. _NJ _
2. Intao Dat -Aýý potd t
I3A. Shgnificant CAO. Yin 2Q N CAlntructicfl Engjpneer Date 1 ~ -
AZ-..l0@'l*1 to upymo Poca to 1169"Mc..I!tI ,WUl0tOI
I gntc'.NE8-NLS Contact _______________Date _____-By ____
3B For Sqgniicaflt CAO:
1. Descrihe Root Cause
2. Th.* %a Generic CAG L3 Y-1 No (if es. ,escrIlvi
FEB 09 1983
eP~aitelbv nat
A~N '83 0122,
NvCR NiO - _ 4542R k 0 1.01
4A. Dispositions: 0 Re.wok C3 Rfjse (--J UseAi Is C eject K5 Othier
(Check Block and Detail Berlo*)
Correct termination slip to reflect actual configuration.
49. Action ReQuired to Prevent Rec,_rence. JFor Significant CAGis Only)
4001.--f
4C_ Dat for Comnpletion of all actions to close NCR (For Significanta CAG's only)_________
Recommended By -!0 ," L ( ~ Z ~Date__ , -, "-
S.~ Approved: M As De'taied in 4 above COthetr (See Continuation Pa~jal
C Refete to Design Project Organization (OPO): OPO Coordination Contact_______________-
Construiction Engineer x IJ'r) 2 . -Date l '
S. Concurirene of Designated GA Reviewer for Action Required to Prevent Recufrence D_________ ate
7. 0 Approved: CAt Detailed in 4 above 0 Other (See Continuation Page)
Design Project Organization:______________ Date-____
S. Approved Dispostiton Completed. and if applicable. Item released from Noiconforming Status
Responsible ln~diiduA Date /4 L.Approved by Data~
9. 'NCR S1losaedonveludes compact. on of acin t t n eurnefor significant NCR's)
Authorized Nuclear lnsiec I o ato
11. Distribution:Site OA Records File NRC Resident InspectorConstruction Engineer ISignificant NCA's Only ICOMST OA Branch ANI ICodea Itsnems Only)GA manager. OEDC EN DES NES.NLSMEDS (Significant NCR's Only)Design Project Organization NSRS (Significant NCR's Only)EN DES NES Codes. Standards.and Materials Section lCode items Only)
REV Rl CONDS 3-1CFRO ,M 1-BD-2 11-B /10-BTO: 1-T -- 18 -FOR: AUX FEEDWTR PMP B-B SUPPLY
- 5003F/
COLOR TB/NO. COLOR TB/NO.$A We 3
SHLD- 0ý /BK____
BK 71-ABL/BK____woBKW _U_____
G ______ GAN
BLW/R ____
G/-B L/R____
56 TO TERMINATIONSIZE 2/0\ TYP ANB
LOC A11T 757LOC A4S 713
MAR?
*LGTH 0042ICONN 0126jc0Nm,.AWflV 5"B2
JUL 15 1981
it. -
- ~-
* COLOR TB/NO. COLOR TB/NO.
- /BK/G _______
ALLOWED BEND RADIUS______
_________MEASURED BENýD RADU_____
______INSFETCTED
/9~I
PP- 3662-B 55 FROM
Rl CONOS 3-1C SIZE 2/0 TYP
1-BD-2 11-B, 10-B LOC.
TO: 1-MTR-3-128/-B LOC
FOR: AUX FEDWTR PMP B-B SUPPLY
ý ~ ~ u 77 C. -- F-
TERNINATION~11NB L GTH "106A11T 757 CONN 01:A4S 713 COINh 451
_NV 5B
JUL 15- 1931E 0 63 fro i
COLOR TB/NO. COLOR TB/NO.' 60.
SH LD_~~ 0/B K ____
w ' I -: A 6 BL/BK______w44-1 So.~.. BK/W_____
.F 4'zEI23 R/W
0 BL/W
BL Ž~.,. BK/RW/B <W/R
G/B K4. BL/R
TERMINATION DATA
-FOREUMANA'------NINEER
OLý NO. CRIMP/TORQUE .
COLOR TB/NO. COLOR .TB/NO.
WR/G
INSPECTE BY: W
G/BK/ DATE:________O
I
7VA Thzsk Force forAeview of Black &r.eý.tch- Findings
Rev. R1EVALUATION SHEET Date 4/6/83
1. Task Force Category 13 for Watts Bar Nuclear Plant - Unit 1q
2. Task Force Category Description and Related B&V Findings:
Termination information on the documentation was in error and was notupdated to reflect the actual configuration:. F142.
3. Evaluation for Cause
A.. Preliminary
The example was an oversight and it is felt it is an isolated case.
B. FinalFinding F142 was an oversight and was an isolated case. A sample of 51AFW te.-rnirvati on -er~ords were sivaluated to confirm' that this findirg wasan isolated case. The sample contained 31 records involving the inspector
and/or engineer on B&V finding F142 and 20 records involving others. The
terminations identified on these records were compared to the terminationdiagrams. There were no errors identified on any of these records. There-
fore finding P142 was an isolated case.
Resp. Org. .9'//3 Task Force ____re /
4. Evaluation for Generic Examples
A. Preliminary
To confirm that the example was isolated, the following sample should be
evaluated:, Compare 40 AFW termination records to the 'termination diagrams.The sample should contain 20 records involving the inspector and engineeron B&V finding F-142 and 20 records involving others.
B. Final
The sampling has been completed. This finding is not considered to begeneric because there were no errors identified on any of these records.
Finding F142 is an isolated case.
Res. Og. ///45A Task Force Concurrence -3,w
FORKM 3
WAITS BAR N7)CLZA? ?JLANTINDEPENDENT REVIE`W
10520DIN525310520.92.0000ref: 10520DIN4080
Finding Nuber / F/i1 /4/4 /40
Co~ents pertinent to finding:
TVA's program to meet the qualification requirements of NUREG-0588 consisted ofthe following steps:
(1) Establish environmental conditions for the different events and determinethe plant areas that were affected.
(2) Identify all components located in harsh environments and classify them inaccordance with the 0588 guidelines.
(3) Review the qualification documentation of the various components.(4) Prepare NCRs for all components that are not qualified.
Please see attachment 1 for the continuation of comments pertinent to findings.
/.6.Program Team Maber
OEDC Program Manager
'irman, OED" licy Comittee 'Date
Black & Veat ch t'C4 ~~ ~ iL
-~ ~ ",ZA IZ u .- _
Classification: Type Ic Category4
();OB-.# & Veatch Project YManager
Black & Veatch Senior Review Team Chairman
Date
I Dat~e
11 ý
ATTAC HI-ENT I'
Attached are the NGRs involve~i anzd
0538 report to NRC.
Closed NCRs
WBNEEB8I119WBNEEB8 120WBNEEB81.25WBNEEB8132WBNEEB814 1WBNEEB8142WBNEEB8161I
a copy Of Ltnv letter that transmitted fVA's
OpnOCRs
WBNEEB8114WBNEEB8115WBIEEB81 21WBNEEB8 144WBNEEB8 160WBNEEB8 210WBNEEB8305WBNEEB8 306WBNMEB8 109WBMN'EB8 1J0
E63326 .07
A2 7 8 30819 7
Director of R7uclear jReaotor RegulationAttention: Fs. E. Adensam, Chieff
Liernsin Branch No. 41Division of Licensin5g
U.S. Nucle'ýar Requlaiory Cammission'Vazhingtorn, D .C. 26555
August 14P,
q
4e, ~
VASV6e
Dear Ms. Adensam:
in the Fatter of' the Application ofTenrnessee Valley Authority
Docket Hos. 510-39~050-391
in accordance with 10 CFR 90.49Q and NUREG-0588, enclosed are 15 copies offinformation demonstrati-ng co=Dliance with e-cuipment ausli;ficatkAon reauire-'nents for Watts Bar Nuclear Klant.
As required by 10 CIFR =90.!I9(j), a r~eco!rd off qual-iffication (documentation)vill, be maint.ained aund available for NTRC audit-.
If y'ou have any questions concerning this rmtter, pleasmt ret in touch withD. 3. 3llis at FTS 8=8-2682.
Very. trulv you.r3,
T=flZISSE! VALLEY AM, ORITY'
~nd subsc,4bed b-fore me
th~is/eAvr~off/,'- 18
HY Co~aission Expire-s )7'
L.. H. Mills, ManagerNuclear Licensing
cc: U.S. N7uclear Regulatory Co-mission1Pegion 11Attn: Hr. James P. O'Reilly, .1eqion-al IAiministrator101 Marietta Street, NW, Suite 2900Atlanta, Georgia 303,03
DIVISION OF ENGINEERING DES-GWJP '61 1Z~11NONCONFORMANCE REPORT 0-AePDWT NO. WBNEEBSI14-'
I7PR JEtT Wattq Bar PLANT Wattq Rar Nuclear UNIT- See attachment 1 7
:PREPARE R/ORGANIZATION/DATE H. E. Kook/EEB/ 12-10-81 llbk
M6 DESCRIPTION OF CONDITION -W
Documentatic~n available for the equipment listed on attachment 1 does not confirm-qualification per the NUREG-0588 guidelines for the environment in which they arelocated.
El DATE OF OCCURRENCE EST I ).ACT. (X) 12-4-81 [DECN REQUIRED Y ES NO
Efl METHOD OF DISCOVERY NUREG-0588 F2SIGNIFICANT CONDITION ADVERSE TO QUALITY
EDUNID CODE (EN DES-EP 8.01) w4j,' YESE NOC3
lBSCHEDULE IMPACT Qp QA ON 'BAC CHIEF/DATEK/~t
SCORRECTIVE ACTICN:
See attachment 1.
SASSIGNABLE CAUSE: (REQUIRED IF SIGNIFIQANT)
NUREG-0588 requires evidence of environmental qualification of electricalcomponents not previously required; therefore, in most cases, conclusivedocumentation is not readily available.
SACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
None required.
Q3- A ENGINEER REVIEW AND CONCURRENCE: %4'6j %.--P/
E]LABOR EST. ( ). ACT. /I) /MH~i~ SCHEDULE EST. I ) ACT. I DAYS'
2D ACTIVITY NO. 1E T4KaiSCRIPTION - DATE INITIATED
El REMAR KS:
DISTRIBUTION: ALL ACTION COMPLETE:
BE QA G ROUP-ENG INEE RING SECTIONBRNHCEF$G.DT
NEB-NLS (For Slignficat NCR's)* *CRCOSDM EDS NC________CLOSED.________
NSRS (For Signtficalf NCR's) CHIEF. QUALITY ENGINEERING BRANCH
H. E. Kook?,"W8A38 C-K DESUS
*DISTRIBUTE AFTER THIS SIGNATURE
t-HANDCARRY COPY TO NEB-LS ALSO
Attachment 1
Sheet 1 of 1Report No. WBNEEB8114
Component No.
1-PM-3-122
2-PM-3-7122
1-PM-3-132
2-PM- 3-132
EQS
WBNEEB0023
Corrective Action
Replace with qualified device
DIVISION OF ENGINEERING DESIGN Z z-NONCONFORMANCE REPORT MB '30 5 0
MEDS Accession No. ____________
DREPORT NO. B W.
2]PLANT Watts Bar Nuclear 03UNIT 1 and 2
DPREPARER/ORGANIZATION/DATE L. J. StefaneV/NEB JUL 15~ 19biDESCRIPTION OF CONDITION
Attachment 1 identify equipment which lacks environmental qualification data to ensure itwill function under postulated accident conditions per NUREG-Q588.
6]DATE OF OCCURRENCE EST( ).ACT.( NA SIGNIFICANT CONDITION ADVERSE TO QUALITY
7 . METHOD OF DISCOVERY
JN ID CODE (EN DES-EP 8.01) IOIBANHCIE/ý
11 CORRECTIVE ACTION:
, See Attachment 1
1:]CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES LI NO
1:1DESIGN CRITERIA DOCUMENT NO.EXPTORQUSN.
1:]ECN REQUIRED [D YES NUO [3 CNO UNKY0NC SCHEDULE IMPACT [3P [D A [
ATTACHM'ENT I
EQS No.
CorrectiveAction
and/or Remarks
Limit 1witches
Solenoid Value
IL ima.tr Switches
Valve Operator
Solenoid Valve
Limit SwitchValve Operator
PCV-1-12
PCV-1-23PSV-1-13APSV-1-13BPSV-1-2 14APSV- 1-24B
LS on PCV-1-30FCV-1-15
FCV-1-16FCV-1-17FCV-1-18
PSV-1-31A:
PSV- 1-31lBPSV-1-6APSV-1-6B
LS on PCV-1-5FCV-3- 33
FCV-3-100FCV-3-47FCV-3-87FCV-3-1 16A
FCV.-3-1 16BFCV-3-126AFCV-3- 126BFCV-3-136AFCV-3-136BFCV-3-179AFCV-3-179BFCV-26-126
FCV-26-240
FCV-26-243
1&2
1 &21&21 &21 &21&2
1 &21&2
1 &21 &21 &2
1GB- 1-0 10 3
MEB- 1-0103
MEB-1-0 104
MEB-1-0 105ý -1 -0 107
1&2 NEB-1-0108
1&21 &21 &2
1 &21 &2
1&21 &21 &21 &2
1 &21 &21 &21 &21&21 &21 &21 &2
1 &2
1 &2
MEB-1-01 11
MEB-3-01 112
MEB-3-01 13
MEB-36-01 15
-To be replaced -
procurement by EBB
D elete - Theseitems are qualified
To be replaced-procurement by EEB
To be replaced -
procurement by MEB
Delete - Theseitems are qualified
Cancelled per NEB(821213 251)Delete - These
items are qualified
ComponentPlantID No.
1 Z6
UnitNo.
I
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT EB '80121 90
MEDS Accession No. _______83__0 __12 ____9 __0
EE REPORT NO. WBNEEB801
2] PLANT Watts B r 'lear-
PREPRERORGAIZAIO/DATE H. E. Kook/EEB/-1-17-83.,
5ýDESCRIPTION OF CONDIT1ON
Documentation available for the equipment 1
fication per the NUREG-0588 guidelines forlisted on Attachment I does not confirm quali-the environment in which they are located.
D6 DTE F OCU .R .RENE ET AC. IX 112-481 9 SGOIICANT CONDITION ADVERSE TO QUAL.I IT
7L -cTIi0D OF DISCOVERY Qualification Re ..Y1--RL I ýtlý R N HC EF/D T S-k N .
-8 -ID CODE (EN DES-EP 8.01) N/A lI t
11CORR ECTIVE ACTION:
Environmental testing has been completed by Wyle Laboratories under contract TV-56071A, as
documented in Wyle Report No. 17506-1. M4emorandum to Electrical Engineering Files
(EEB 821222 909) and EEEQR EQS No. WBNEEBOO38, revision 1, document the environmental
qualification of the devices to WBNP conditions, when the maintenance/inspection schedule
and procedures per the memorandum from K. N. Sprouse to H. J. Green dated December 29, 1982
(EEB' 830103 931) are followed.
i] ORRCTIE ATIO DVIATES FROM A Dr-SIGN CRITERIA REOUIREMENT YES NO -
13 ESG CIERADOUENT NO. EXCEPTION REQUJEST NO.
!]4 EC EUIRED [] 'S NoEl I ICN No SCHEDULE IMPACT ED P [ A U-
JR1 'ý3] Uý11T s 1 and 2
NCR WBNEEB8119R1
Attachment I
I, 2-LM--3-148A
1, 2-U4--3-156A
I, 2-ILM-3--164A
1, 2-121-3-171A
WB17EB003 8
WBNEEB0038
WBNEEB003 8
WBITEE003 8
063014.01
DIVISION OF ENGINEERING DESIGN
NONCONFORMANCE REPORT
] PEPRE/OGAIZAýTION/DýATE ýH. .VpkEB3l1JDESCRIPTION OF CONDITION
J~~~zii
EPORT NO. n*
Documentatio'n available for the equipment listed joa attachment 1 doesnot confirm qualification per the NUREG-0588 guidelines for the envirornment in whichthey are located.
7)DATE OF OCCURRENCE EST(C ),,ACT.( ý 12-4-8 El]ECN REQUIRED 0)'ES O NO 3 q
aMETHOD OF DISCOVERY NUREG-0588 ~ SIGNIFICANT CONDITION ADVERSE TO QUALITY
SCHEDULE IMPACT [3p j A OwC]CNEIAE ~~~g
17 CORRECTIVE ACTION:
See attachment 1.
ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFIGANT)
NUREG-0588 requires evidence of environmental qualification of electricalcomponents not previously required; therefore, in most cases, conclusivedocumentation is not readily available.
16ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
None required.
[] QA ENGINE ER RE VIEW AND CONCUR RE, CE.
lBLABOR EST. ( ), ACT.()
[2ACTIVITY NO. 1 TAS K
H -9SCHEDULE EST. C .ACT. DT NTAE
PT ION ---- ýýAEýNTAýD
j~REMARKS:
"f- Instrument numbers corrected on revision 1. This NCR supersedes NCR WBNEEB812O. I R1
Fr1DISTRIBUTION: S ALL
F71 QEB QA '-ROUP-ENGINEERING SECTION~OEDC QA
NEB-NLS (For Signifiemt NCR's)** *NCME DSNSRS (Faq SIgrmificent NCR's)
/I. CQ E I
' "H. E. Kook, W8A38 C-K*DISTRIBUTE AFTER THIS SIGNATURE
ACTION COMPLETE'BRANCH CHIEF/ORG. DATE
R CLOSED:
CHIEF. QUALITY ENGINEERING BRANCH W ~E
IUSE
Attachment 1
Componen t No.
1-FT-3-147A
2-FT-3-147A
1-FT -3-147 B
2-FT -3-1478
I-FT-3-155A
2-FT -3-155A
1-FT-3-155B
1F3-155A
1-FT-3-163A
2-FT-3-163A
2-FT -3-163 B
1-FT-3-170A
1-FT-3-170A
2-FT-3-170A
2-FT -3-170B
EQS
WBNEEB0053
Report No. WBNEEB8120R1
Correctiv e Action
Repi ace wi th qual if i ed .device
idi
W.7
DIVISION OF ENGINEERING DESIGN ET 161?ii1 '.'V41NONCONFORMANCE REPORT REPORT NO. WBU97FPI ?:
~PROJECT W1l Rr 3PNT NT eea1tta eflij
n5 IR EPAR E R/O RAN IZATION/DATE H. E. Kook/EEB/12-1O-81
67 DESCRIPTION OF CONDITION
Documentation available for the equipment listed on attachment 1 does not confirmqualification per the NUREG-0588 guidelines for the environment in which they arelocated.
IDDATE OF OCCURRENCE EST(I ), ACT. (X)I 12-4-81-E ~ECN REQUIRED g] YES Q NO
F1METHOD OF DISCOVERY NUREG-05 88 ~SIGNIFICANT CONDITION ADVERSE TO QUALITY
UNID CODE (EN DES-EP 8.01) YES R3 NOD
~SCI*EDULE IMPACT QP QA QN ; 4M )F7 D ///i1
SCORRECTIVE ACTION:
See attachment 1.
ASSIGNAB3LE CAUSE: (REQUIRED IF SIGNIFICANT)
NUREG-0588 requires evidence of environmental qualification of electricalcomponents not previously required; therefore, in most cases, conclusivedocumentation is not readily available.
ACTION REQUIRED TO PREVENT REC URRENCE: (REQUIRED IF SIGNIFICANT)
None required.
*a0A ENGINEER REVIEW AND CONCURRENCE: .
aLABOR EST. ( ),ACT. C) /N 1F.SCHEDULE EST. ('). ACT.(C DAYS
2 ACTIVITY NO. I T41K CRIPTION - DATE INITIATED
~REMARKS:
DISTRIBUTION: ALL ACT ION COMPLETE: ____
DEB GA G ROUP-ENGINEE RING SECTION BRANCH CHIEF/ORG. DATE
E3OEDC OA
NEB-NLS (For SuigIflcant NCR's)" j3NCR CLBE 0: ____
ME DS___________________ __
NSRS (For Slonlficafnt N¶')CHIEF. QUALITY ENGINEERING BRANCH
eA H. E. K DokIN8A3 C-KES USE
'DISTRIBUTE AFTER THIS SIGNATURE
.- HANOCARRY COPY TO NES-NLS ALSO ____________________________
Attachment 1
Componeft No.
Positioner on1-LCV-3tl48
Positioner on2-LCV-3-148
Positioner on1-LCV-3-156
Positioner on2-LCV-3-156
Positioner on1-LCV-3-164
Pos~ticnar on2-LCV-3-164
Positioner on1-LCV-3-171
Positioner on2-LCV-3-171
Positioner on1-LCV-3-172
Positioner on2-LCV-3-172
Positioner on1 -L CV-3-173
Positioner on2-LCV-3-173
EQLS
WBNEEB0057
Sheet I of 1Report No. WBNEEB8121
Corrective Action
Type-test
DIVISION OF ENGINEERING DESIGN Epi' 1112 211 944^.MfNI^MDUAM KIPP CIRPT , RPOR NO WBNEEB8125
_PRýOJEcT' watts Bar PL.ANT Watts Bar Nuclear 40 UNIT 1 and 2 -
-U.J ( :TpN OF cONOITIO14
Present documentation available for the-equipment listed on attachment 1 does not confi rm
qualification per the NUREG-0588 guidelines for the environment in which they are
located.
7DATE OF OCCURRENCE EST ).ACT. k ) 12-4--31 U]ECN REQUIRED [DYES 0NO ECN 3593
METHOD OF DISCOVERY NMG-U8 OSIGNIFICANT CONDITION ADVERSE TO QUALITY
gUNID CODE (EN DES-EP 8.01) YES El NOD
SCHEDULE IMPACT O A 0N'BRANCH CHIEFIDT
1,CORRECTIVE ACTION:
See attachment 1.
NUREG-0588 requires evidence of environmental qualification of electrical componen ts
(it previously required; therefore, in most cases conclusive documentation is notW
"eadily available.
9ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
None required.
E-_A ENGINEER R EVIEW AND CONCURRENCE: 2 "
[FB LABOR EST. I ), ACT. ( MH JE SCHEDULE EST. ( *ACT. DAYS____
*R ACTIVITY NO. 1 T "DESCRIPTION 1DATE INITIATED
[2 REMARKS:
,, Additional corrective action by WBN CONSI is being tracked by ECN 3593. No further
14~ EN DES action is required.
EDDISTRIBUTION. BALL ACTION COMPLETE:, ..... L.....-s/,4
~QEB QA GR OUP-ENGINEE RING SECTION NC HE/RG.D
E3 ODC QA ýNmI
NEB-NLS (For Signficant MCRs)" *NC CLOS2051D00
(MEDS ________820511 ______004__
NSRS (For Significant NCR'%) CHIEF. QUALITY ENGINEERING BRANCH
S. C. Cothran, W8A36 C-KS,9: 4-QES USE
I DISTRIBUTE AFTER THIS SIGNATURE E 98 0-30 940
R EPAR E RfORGAN I ZATIONIDATE S. C. Cothran/EEB/12-10-81"Iwow""
Z/ /
Sheet 1 of 1
Report No. WBNEEB8125
Attachment 1
Plant I-.D.
LSV-3-148A
LSV-3-156A
LSV-3-164A
LSV-3-171A
EQS
WBNEEB0035
Corrective Action
Replace with Qa idASCO Valve.
Uni t
1,2
I.---
).½tt~ R~r
F I PR EPAR E (OFIGAN IZATION/DATE
~, u..e..~ 'uJi~LrutEUUILNL&Jb * 112 1 0 0NONCONFORMANCE REVORT REPORT N().
3PLANT q4 UNIT
S. C. Cothran/FFR/12-9-R1ElDES-CRIPTION OF CONDITION
Present documentation available indicates that theis not qualiffied per the NUREG-0588 guidelines forlocated. I
M DATE OF OCCURRENCE EST( ), ACT.( )
ElMETtioO OF DISCOVERY NUREG-05889UNID CODE (EN DES-EP 8.01)
~SCHEDCULE IMPACT QP 0JA ON
equipment listed on att~chnent 1the environment in which they are
NIFICANT CONDITION ADVERSE TO QUALITY
CORRECTIVE ACTION:
See attachment 1.
SASSIGNABLE CAUSE: (REQUIRED IF SIGNIFIQANT)
NUREG-5088 requires evidence of environmental qualification of electrical componentsnot previously required; therefore, in most cases, conclusive documentation is n~( readily available.V
16ACTION REQUIRED TO PREVENT RECURRENCE: (REQIJIRED IF SIGNIFICANT)
None required.
*7CA ENGINEER REVIEW AND CONCURRENCE: O~. ~//c/V~2 LABOH EST. ( ). ACT. CH ) MN SCHEDULE EST. C .ACT. C3DAY'S
2ACTIVITY NO. 1F TASK DESCRIPTION 1DATE INITIATED
REMARKS:
This NCR is superseded by NCR WBNEEB8132R1, MEDS accession No. EEB 821209 915. 1
'6DISTRIBUTION: ALL ACTION COMPLETE: A'JI $ x~62CE OCA G ROUP-ENGINEE RING SECTION bRANC'H CHIEF/ORG. /DATEL.J 0 DC CIA I.-
NED-NLS (For Significant NCR's)' *NCA CLOSED: QS801 0N4SAS (For Significant NCR',) CHIEF, QUALITY ENC.iNEERING BRANCH
e.Ap4 So C. Cothran, W8A36 C-K GIES USE EB '8 1 5 92*DISTRIBUTE AFTER THIS SIGNATURE*HANDCARRY COPY TO NEB-NLS ALSOI
I
:01-
Attachment I
Plant 1.0.
FSV-1-7
FSV-1-14
FSV -1-25
FSV-1-32
FSV-1-147
FSV-1-148
FSV-1-149
FSV-1-150
FSV-1-174
FSV-1-175
EQS
WB N EE B0036
Report No. WBNEEB8132
Corrective Action
Replace W.-ith QualifiedASCO Solenoid Valve
Unit
112
C.
Nc~co '~-(~A 'hP CiY L nRPORT Ný-
C T i a riA/NT ~:it.ýJS 'Se at.cLrt2
Cr CL'T!'
Doucurnentation awa'il~ble florI the c-Cl'iPM211t listed on E~!-%1,-L,,i 1 does not. confirmnqjualificati-n per' the NVR,1G-O',,,. guidelines for the nvi roriment in vihich they areIlocated.
7 DAIS OF OZU-NC uT ),ACT. IX) 12 -.- r~tal: ! Y E- N
ME 1C)OCI OF VICOx,ýY N'U P l,;~ F- 051 H: .CAN7 CrC:.DiC AIE¾'R-`.. TOD QC:ALITY
r~ EPS u~) '~* ~.p~: . Vs L NO7LJ ______
It SCHEDULE IMPACT C,, RA NN C. HcHH; rF tAr) A T '/ r 4~/i
SCORRECTIVE ACTION:
See attachment 1.
F 1ASSIGNABLE CAUSE: (REOUIREr;, ir S~rNIFIQAIJT)'
NUREG-0588 requires evidEnce of environmental qu~lfcto ofectiL
components not Dreviovsiy required; therefore, in most cases, conclusivedocumentation i's not readily available.
15ACTION REQUIRED TO PREVENT RLCURRENCL: (REQWRED IF SIGNIFICANT)
None required.
*Q1 A ENGINEER rEV!EW AND CONCURRENCC ' J ~
hlLABOR EST. ( ). ACT. ()MH 9: SCHEDULE EST. ( *ACT. C)DAYS
25ACTIV!TY NO. 1 O21 Lr'DSCRIP7:0N 1:4:E 11 ATED
2- E MARKS:
G 7 DISTRIBUTION: ALATO OPEC
0-5 A GROUP.ENGINEERING ZECTION BRN..CHii../oRc. DAT
OCE C CA
DT
NEB-NLS (For Significant NCR'&)** r~NCR CLOSED:
ME DS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NSRS (For Significanvt NCR%) . CHIEF,- UUALITY E,\G;NELRING BRANCH
SH. E. KookýýVJSA38 C- K
DISTRIBIUTE AFTEF' THIS SIGNATVPE
*H/,N!CARRY COPY TO NED.WL.S AZ!'1
2/5i
At"t ac h ne nt 1
Sheet I. of IRc purt I co. I-IBEF- C21
Comip,, ent No.
I-FT-3-142
2-FT-3-142
EQS
WBNEED0032
Corrective Action
Replace with qualifiedi device
of
D . DlIT 0'F -;~ E~1: 3CP FC EC 01 E I 1 0h-~~~r -r OX I. . .LJ :Or.T NO.
t: WT 1 ON tj17 C 0.: i' CUN - --
r~oum::~onC aafl' .2:2 for the ~ip:; on at~r.L;.1does noý coni~fIrm,qualific~tionk per NUkEG-O560 guicielfiis for the errI.ironmiient in hh they arelocated.
:)DATE~ OF OGCCRýJC= ~ E (ST401
91.I~T'-:OD OF DiSCOM.ERsV
97 U-141 CODE (LN Q!7 EP e.:;I)
______________ý ADVERL TO~ QUALITY
Y E~*~ -1A N 0 -EtaSCHEDULE IMrAC CA E / " 2
141 CORRECTIVE ACTION:See attachr~:icrit 1.
AS!;IGNAS3LE CAUSE: (REQUIRED IF S!?ZIFICANT)
NUREG-0588 requires doCuMe n tatio7) of environmental qualification of electricalcomiponents-1 not previously required. Qualification dcocuimertation is not readilyavailable for those electrical curoponents listed on attachment 1..
51ACTIUN REQUIRED TO PREVENT RECUiRErNICE: (REOUIR.ED IF SIGNIFICANT)
None required.
Q1CA ENCJINEfL1 REVIEW AND CONCL1F.RENC;::
LABOR EST. 11 ), ACT. ( H~ SCHEDULE ESI. ( ,ACT. ()-DAYSt
ACTIVITY NO, I Ar 7, F-i-i ~c.NR REMA RKS:
MSDTRIflUTION: -ALL ACTION4 COMPLETE:DES CA G ROUP-ENGINEE RING SECTIONJBAdiDT
NES-NLS (F~or SIgnificcnt N'CRsP CRCLOEDMEDS - -CCLSDNSRS (For Significant NCR's) CHCF QLJI.:TY ENGINEERH:'ýG SkANCH D ;
"H. W. Luton, W8A31 C-KOEk' USE
ISTRIBUTF AFTER THIS r.q'C :A1VJREADCAIPY C~PY TO IjUf,-NLS A~LSO ____
Componlent No.
o -PS ,7 0-203O-PS-70 -2101-P S-3-138A2-PS-3-13SA1-PS-3-138B2-PS- 3-1.38311-PS-2.-148*2-P3-33- 148~*1-PS-3-156*2-F'S-3-156*1-PS -3-161 l*2-PS-3-164*
I-PS-3-171*
ATTACH F r'T J
EQS
W NEI,! t EB"103 1
s e t I C. I'1Report Nio. 1l:'Ji:EERSI,12
-Corrective Actiý)n
Replace w/Qu aIified Device
*Not yet installed.
031325.11
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
MEDS Accession No.EEB90830328
WE REPORT NO. WBNEEB8144R3
'2 PLANT Watts Bar*NuclearUNT 1an2
PREPARER/ORGANIZATION/DATE H. E. Kook/ EEBI 3-24.-33
The Custom Components model 604G pressure switches listed on Attachment 1 are
required to not fail in a manner detrimental to plant safety for six months
after the beginning of a main steam line break or a feedwater line break.
Environmental conditions during an accident far exceed the manufacturer's
s p c f c a i n D
S R P I N O O D T O f o r t e m p e r a t u r e , p r e s s u
r e , a n d h u m i d i t y . T h e m a n u f a c t
u r e r
does not provide a radiation specification. There is no known test data to
confirm the manufacturer's specifications. Therefore, these switches are not
qualified per the NUREG-0588 ouidelines for the harsh environment in which they
are located.
6 E'Aa -JOCCURRENCE EST( ) .ACT. X) xF9248 AN ODTO ADV~EiRSE TO QUALITY
:7 METHOD OF DISCOVERY Qualification Review JYE NRAOHHLE7~
8UNI D CODE (EN DES-EP 8.01) N/L,0
11 CORRECTIVE ACTION:
The devices listed on Attachment I will be qualified per NUREG-0588 by:
1. Relocating the switches to an area with less harsh accident environments,
and R3
2. Replacing the switches with a device or devices which are fully documented
as being environmentally qualified per the NUREG-0588 guidelines.
E1]CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NOm
D13 DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
__14 ECN REQUIRED [N YES NUF I CNN NtH SCHEDULE IMPACT P A N
9 5-
Z/9?
NCR WBNEEB8144R3
Attachment 1
EEEQR EQS No
WBNEEB0050Component No.
1 ,Z-PS-3-140B
1 ,2-PS-3-150B
1 ,2-PS-3-160A
1 92-PS-3-160B
1 ,2-PS-3-165A
.1,2-PS-3-165B
DIVISION Ut- LNUr 'r-tr'r'~i tur-urv EL 011C.I-
NONCONFORMANCE REPORT M) REPORT NO. WBNEEB8M
2tt PROEC 3 PLANT wats Bar Nuclear -7 UNIT See attachmen'Vl1
~]P~EARR~RGAIZTINJATE H. E. Kook/EEB/12-9-8 1
cE-SCRIPTION OF CONDITION/- r
Preentdocmenatin aailbleinicates that the equipment listed on attachmenit
is not qualitied per the NUREG-0588 guidelines for the environment in which they are
located.
7DATE OF OCCURRENCE EST I .ACT. Cx~ 12-4-81 FI ECN REQUIRED 13YES QNO 3443 _____
SMETHOD OF DISCOVERY 2UE08 ~ SI NIFICANT CONDITION ADVERSE TO QUALITY
UNID CODE (E DES-HP 8.01 YES FL NOD _____
lBSCHEDULE IMPACT Q~ QA Q ~ . CHIEF/DATE /
8CORRECTIVE ACTION:
See attachment 1.
ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFIQANT)
Flood levels were redefined for a LOCA inside containment,
ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
None required.
1 0A ENGINEER REVIEW AND CONCURRE E: /2_____
SLABOR EST. ( ).ACT. C M gSCHEDU I .CI ACT. (
J2 EACTIVITY NNO. 11f T K DESCRIPTION RDATINIIATE
SREMARKS: I
Additional corrective action by WEN CONST is being tracked by ECN 3443. No further
EN DES action is required.
DIS-TRIBUTION: S LACINCOMPLETE: ~
QES GA GROUP-ENGINEER ING SECTION BRAN
NEB-NLS (For Significant NCR's)* NC
MEDS -NC CLOSED: O ~ 8O1IffL
NSRS (For SignIf1caflt N*V'S) CHIEF, QUALITY ENGINEERING BRANCHA
jfH E. Kook7, W8A38 C-K QE§ USE
.'DISTRIBUTE AFTER THIS SIGNATUREE1 '8 0 2 93
*HANOCARRY COPY TO NES-NLS ALAO-
KAttachment 1
Component No.
1-LT-3-172-A
2-LT-3-1 72-A
1-LT-3-173-B
2-LT-3-173-B
I-LT-3-174-B
2-LT-3-174-B
1-LT-3-175-A
2-LT-3-175-A
WBNEEB0002
Report No. WBNEEB8160
Corrective Action
Relocate above flood level.
DIVISION OF ENGINEERING DESIGN EE 81 1 2 b 9QNONCONFORMANCE REPORT &Z EOTN.WNFR i
21 O'CJECT 3at Rr I PLANT 4-tt BaLIlo 1 NIT Se tacmn-
j~PREPARE R/ORGAN IZATION/DATE H. F. Kook/FER/12-15-81
DE.SCRIP TION OF CONDITION
Documentation available indicates that the equipment listed on attachment 1 does notconfirm qua~lification per the NUREG-0588 guidelines for the environment in whichthey are located.
ElDATE OF OCCURRENCE EST I .ACT. (x)12-4-81 [DECN REQUIRED Y YES NO
F1METHOD OF DISCOVERY N UREG-0588 E]SIGNIFICANT CONDITION ADVERSE TO QUALITY
ElUNID CODE (EN DES-EP 8.01) W"I4l6 1 YES 0 NOC3
SCHEDULE IMPACT 0 P Q0A O N -,BZrA~H CHIEF/DATE,
34CORRECTIVE ACTION:
See attachment 1.
r ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFIGANT)
NUREG-0588 requires evidence of environmental qualification of electricalcomponents not previously required; therefore, in most cases, conclusivedocumentation is not readily available.
SACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
None required.
GA QENGINEER REVIEW AND CONCURREN _______
SLABOR EST. ( ). ACT. ()MH SCHEDULE EST. C .ACT. C)DAYS
2ACTIVITY NO. 1 r"SK DESCRIPTION DATE INITIATED
SREMARKS:
This NCR is superseded by NCR WBNEEB8161R1, MEDS Accession No. EEB 830606 943.
DISTRIBUTION: ALL ACTION COMPLETE: 7p (SQEB CIA OROUP.ENGINEERiNG SECTION BRANCH CHIEF/OA~
OEDC QA ______
NEBL.LS (For Significant NCR's)* 'NCR CLOGED: QS801 0ME OS ________820511________004__
)NSRS (For Significant NCR's) CHIEF. QUALITY ENGINEERING BRANCH'E
`Hj ~. E. Kook, W8A38 C-K QEDi '83 620 91DISTRIBUTE AFTER THIS SIGNATURE
J.HANDCARRY COPY TO NEB-LS ALSO
ZZ73
Attachment I
Sheet I of IReport No. WBNEEB8161
Compon~ent No.
I-PX-3-142
EQS
WBNEEB0069
Corrective Action F
Type-test or replace with qualified device2-PX-3-142
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT EEB '82 1 2 1 3 9 m
rnREPORT NO. 1iBNFF.BZ10.PLANT Watts Bar Nuclear t UNIT 1 and 2PREPARER/ORGANIZATION/DATE H. E. Kook/EEB/12- 8 -82
SDESCRIPTION OF CONDITION
The positioners on valve numbers 1,2-LCV-3-174 and 1,2-LCV-3-175 are Masoneilanmodel 8012. They are located in the South Valve room and are required to operatefor six months after the start of a Main Steam Line break in the valve room or aFeedwater Line break in the valve room (NEB 820607 220). The manufacturer'sspecifications of temperature and pressure are exceeded during an accident, andthere is no documentation of manufacturer's specifications. Therefore, requiredoperability during design basis accidents is not confirmed as required by NUREG-0588.
L6]DATE OFOCCURRENCE EST( X),ACT.( )12-6-82 51SIGNIFICANT CONDITION ADVER~SE TO QUALIT-Y
ElMETHOD OF DISCOVERY Qualification Review ~ vYESE NOE
UNID CODE (EN DES.EP8.O1) N/A
I~CORRECTIVE ACTION:
Type-Lest the positioners to document environmental qualification per NUJREG-0588guidelines.
CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YESQ NO
13DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO. ______
ECN REQUIRED [:YES NO [3 ECN NO. 15SCHEDULE IMPACT C] P A DN
\ 4 Vp-4. /\\~k~ I
NCR WBNfEB83O5
Attachment I
1.PS-3-No.
1-PS-3-121A
2-PS-3-121B
1-PS-3-121B
2-PS-3-121B
1-PS-3-121D
WBNEEB0078
0413196.05
2ZZ5
692/ A6A26
692/A6A26
692/A6A26
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT 8 05 2 91
MESAccession No. EEB '8 0 2 91
WREPORT NO. WBNEEB8306
PLANT Watts Bar-Nuclear Plant I F73 UNIT l and 2..
PREPARIER/ORGANIZATIONIDATE H. E. Kook/EEB/5-9-83
DESCRIPTION OF CONDITION
The flow indicators listed on Attachment I are Westinghouse model VX-252, located in the
Auxiliary Building - Room 692/Al. They are required to not fail detrimental to plant
safety f or one month after the start of a HELB outside containment and for 100 days
after the start of a LQICA/HELB inside containment. The temperature and humidity levels
in Room 692/Al during a HELB outside containment exceeds the levels to which the
manufacturer has tested these devices.
Therefore, these indicators are unqualified per NUJREG-0588 guidelines for the harsh
environment in which they are located.
6]DATE OF OCCURRENCE EST (X ), ACT. I15-9-83 F91S GNIFICANT CONDITION ADVERSE TO QUAi-ITY
:7] METHOD OF DISCOVERY Qualification Review <jj3YSa N 1
:8 UNI D CODE (EN DES.EP 8.01) N/A 10~1 -aCHHE/~
11, CORRECTIVE ACTION.
Add a Class 1E isolator to the instrument loop so that any failureof the non-divisional indicators listed on Attachment I has no
effect on the Class 1E instruments in the loop.
:12] CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NO)
D13 DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
14 ECN REQUIRED E) YES NODZ kCNN() SCHEDULEIMPACT flP A Nit
77-7
NCR WBNEEB8306
ATTACHMENT I
ID No.
1-FI-3-147D
2-FI-3-147D
1-FI-3-155D
2-FI-3-155D
2-FI-3-163D
-1-FI 3ý-170-D
2-FI-3-170OD
EEEQR EQS No.
WBNEEB0083
WBNEEB0083
WBNEEB0083
WBNEEB008 3
VtBYFFBOOSI
WBNEEB0083
WBNEEBO8 3.
WBNEEB 0083
WREPORT NO. WBNEEB83O05
~jLAT Wat BrNuclear - [3 UNITS 1land 2-
74 PR EPAR ER/ORGAN IZATI ON /DATE A. W. Thomas/EjE/5:-_12- 8 3
W5 DESCRIPTION OF CONDITION
The pressure switches listed on Attachment I are Custom Component model 604G and are
located in the auxiliary building - rooms 692/A6 or 692/A26. They are required -to operate
for one month after the start of an HELB outside containment and for 100
days after the
start of a LOCA/HELB inside containment.
The accident maximum temperature (1720F) exceeds the manufacturer's specification
(1600F)
for approximately 6.75 minutes which we feel would not affect the operation
of the switches.
The other environmental accident conditions are with-in the manufacturer's specifications.
There is no known test dat a to confirm the manufacturer's specifications.
There is no documentation to show that these switches are qualified
per NUIREG-0588 guide-
lines for the harsh environment in which they are located.
DATE OF OCCURRENCE EST IX1. ACT. 5-18 IGNtFICANT CONDITION ADVERSE TO QUALI Ty
16 M-18 YE--N
ElMETHOD OF: DISCOVERY Qalificat ion Review L1 M H CHIEF/ý ý
FS1UNID CODE (EN DES-EP 8.01) NAt
CORRECTIVE ACTION: Replace the switches listed on Attachment I with devices which
are fully-documented as being environmlfentally qualified per
NUREG-0588.
E12]CORREECTIVEE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES E NO1 1 0 1713 DESIGN CRITERIA DOCUMENT NO.
EXCEPTION REQUEST NO.
EC EURED YES NO[] ECN NO. M15 SCHEDULE IMPACT P ] A E
TVA 10700 (EN DES.12/82)
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
ME DSAccessionlNo. 0E '35 IL
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
MEDS Accession No.N EB T 3O05- ""0 *
WREPORT NO. WBN1 M8130 R1W PLANT Watts Bar 'Nuclear 13UNIT'
PREPARER/ORGANIZATION/OATE Paul B. Nesbitt/0 DES-NEB/April 15, 1983 Jgrf 41kiWL~DESCRIPTION OF CONDITIONII
T2e following transmitters have been given interim environmental qualification by the NBCuntil the second refueling outage at Sequoyah unit 1, refer to SQN license. NBC hasrequired renlace=nent of all Barton (Lot 1) transmitters at Sequoyah unit..l at that time,and it is exoDected that this requlirement will1 also apply to Barton (Lot 1) transmittersat atts-3.Bruit.
L-1-3-38 (LT1-519)", 55(LT-527)**, 93(LT-539), 94(LT-538), lo6(LT-5h9)* ', ;17(LUT-548)**PT-68-68(405)**, PT-68-69(406)**, LT-68-320(46l)**, 335(4o6)**, 339(459).
N1ote: LT-68-320 is located in a zone subject to a total integrated dose of 120 megar,,dsgamma (40 Year plus accident).
DATE OF OCCURRENCE EST ',ACT.(I X i :C-5-81
100 OF DISCOVERY
CODE IEN DES-EP 8.01) 1~T,~M~~I-/~~I
111 CORRECTIVE ACTION:
J-n .7e uLransmit-.ers -will be re-ola-ced vith fully qualified transmitters.
1 A ECTIVE ACTION DEVIATES FROM A D ESIGN CRITERIA REQUIREMENT
1ZV
8c51
I 3j DESIGN CRITERIA DOCUMENT NO. N/A EXCEPTION REQUEST No. N/Af4] ECN REQUIRED YES NOE[ ECN NO L3JSCHEDULE IMPACT P A N
YES El NO [E1 I
-7=0ý Pre-zaration
NONCON1FUK-MANCh K1i-VUli Wj REPORT NO.
Ilil PLANT tT~¶LJ~I 1 and ~
01JL~ WW? JL~ r Cflhl -
P~REPAREAtOAGANIZATIONAT J.W Aderholt/MEB/9-21-81 n -. 4440A oC
DESCRIPTION OF CONDITION -W Vlu
T7'.~iliary feedwater pump turbine electrical control equipment procured under contractV5t23O-83O94 does not have documentation showing environmental qualification. A list ofessential component'16. attached.
DATE OF OCCURRENCE EST C X). ACT. C)9-17-81 2jJECN REQUIRED QYES NO
METHOD OF DIS'COVERY NUREG 0588 Program ~SIGNIFICANT CO .NDITION ADVERSE TO QUALITY
U'NID CODE- (EN DES-EP 5.01) N/A YESU NOD
SCHEDULE IMPACT E~p D3A QN ~R ~ CIFDT
CORRECTIVE ACTION:
Terry Turbone Corporation is conducting a test program to qualify the turbine controls
to current NUREG-0588 requirements.MB '83 1101 01
ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFIOANT)
ACTION R.EQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
*QA ENGINEER REVIEW AND CONCURRENCE:
LABOR EST. ).ACT. ( ) MH
ACTIVITY NO. I -T-3TASK DESCRIPTION
REMARKS:
~1SCHEOUL. EST A Y*C.
-7R-DATE INITIATED
IDISTRIBUTION:OF.S C OAROUP.ENGINEE RING SECTION
NEB-LS (For Significant NCR")**
Q,.SRS tp~ .t ignificant NCRs5)
DISTR IBUTIE AFTER THIS SIGNATUREI4ANDCARRY COPY TO NEB-NLS ALSO
ALL. ACTION COMPLETE:
*3NCR CLOSED:
.1
BRANCH CHIEF/ORG. DATE
CHIEF. QUALITY ENGINEERING BRANCH4
GDE USE
M
UNI 1 1 and 2
Z31
AUXILIARY FEEDWATER PUMP TURBINE CONTROL COMPONENTSCONTRACT 74C30-83094
rniDESIGNITION
1- SC-46-5 72-SC-46-57
I-Sm-46-57A2-SM-46-57A
1-XC-46-542-)E-46-54
1 -SM-46- 57 B2- SM-46-5 7B
2-NE-46-57
2-NE-46-57
2-SE-46-56
I-SS-46-53
2-SS-46-53
1-ZS-46-57
2-ZS-46-57
1-SM-46-56
1- SM-46-56
2-FCV-16-51
2-FCV- 1-51
NAME
EHpanel and drop resistor
Ramp generator/signal converter
OS test controller
EGR
Wtentic pickup. Cover nor
Magnetic pickup, tachometer
Limit switch, mechanical overspeed trip
Limit switch, trip and throttle valve (FCV-1-51)
Tachometer and trip contactor
Motor operator and solenoid (on trip and throttlevalve)
E81264.02
FORM! 3
WATTS BAR' NUCILEAR P-AINTINDEPENDENT REVIEW
10520DIN521310520. 92.0000ref: 10520DIN3088
Finding Number / F/ 3/0/0/
0
Comments pertinent to finding:
The chemical47W803-1 R24on 4/14/83.is complete:
References:
e~
feed connections were removed from the mechanical flow diagramon 4/12/83, and the piping drawings 47W401-7 R10 and 47W4.01-9 R9The changes were made under ECN 3507.. EN DES corrective action
ECN 350747W803-1 R2547W401-7 R1047W401-9 R9
Program Team Miember Date
OEDC Prog-ram, Manager
Cýiarman, OEDC a iy Cotmmittee
/ate
bate
Black & Veat ch _A, ý 2eW'4/ WA.~ X4-Z~4- "Ae*ý..
Classification: 'Type ______________
Black & Veatch, Senior Review Team Chairman
Category A
Date
D~te-
Z. 3 Z_
2-33
ENGINEERING CHANGE NOTICECOVER SHEET SWP '83 0 214
(BEFORE ISSUANCe OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
To: Construction Project Manager
From: Design Project Manager
DATE FES 14 s3Was IJ Analysis Required: Yes
ECN NO. _507
Watts Bar Nuc1lt Piant, SPring CitYL 31A
SWP 204 GB-K
'BU+A 'et Týew -. 2 zI -
No 1
d.T.PBAxTER SW.P -WK; - M__U,_I
re Apared by StiSection- Leader
-R eleased: LPa _APro&ctEngineer eIgn Project nager'Dt
SCOPE TRAKSFEe PKrG: X-003~(2).
Project WATTS AR NUCLEAR2 PLANT Affeacted Unit(s) I~System or Feature WIAIN ALau. FEEOWA-rER J)ý 3A 4 356 SEC.CHEMICAL FEED Zn36Reference & Description of Change REmoyrt s CEM. c FFE. 3rN~NS Fzom MAIN FW, F' YP33
&10N AUX. FtEZDWPATER L4NES. TIE 3P,. O4EM. F:EED TO :STEAM GEN. VJET LAYUP RECIRCUaLATION-
I - r A ~ - -~ fl,.~' ~ a * ~ rL6i'1c PnUULL DI rk-N 2.3fLQ*
-DRAWINGS OR B/M5S INVOLVED:
- , (Data Sheets Required) ~
1ENGIiEERING SUPPORT DRANCHES
Civil PA5ZEjectrical
Mechanical
Nuclear
NUCLEAR PROJECTS DESIGN GROUPS
Civil
Electrical
Mach 2, 4.
FOSSIL. HYDRO & SPECIAL PROJECTS DESIGN
SPECIAL DESIGA PROJECTS
ARCHITECTURAL SUPPORT IRARCK
REF. Pn!2M GREEN TO SPR~OU-E (DES A?- 1-0-; Q76)Yesor-
No
YESlJ12O
PHYSICAL WORK MUST BE DONE 8EOE
Pre-Op lot Fuel 1.Tlwrn Comm'ITest Lo.1d Power Ooer'n Re
Units) I.Uflitmi
Date Branch-Data Sheet
Available
ENGINEERING SUPPORT INRACHES 3 Y4Approval Required
_________ Required for PSAR or FSAR
Required for Preoperational Test:If Yes, Test No.
Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report Required
lst QA Appliesfuel
Security System ModifiedVendo-r(s) involved:_______
CC (AttaCnme~%). #4w Yes (
CHIEF. ARCHITECTURAL SUPPORT BRANCH, WRC126 C-K4j" EF. CIVIL ENGINEERING 6RANCH, W90224 C-9C'IZFF EL ECT R ICAL ENINCIEERING BRANCH. WOC126C-CHIEF. "EC A'NICAL E:GIN:EEVRING BR$ANCH, V7C126 C-KCHIEF. NUCLER EN GINEER IC2 C-9CHIEF, QUAL' T1 ISSIRANC HNH.jO I-
*C~tWGN- DU 7'0 A/aCc Cflrm4.' c*-ietJr.
I'L~ST rFNING IND I~O $ ~CHIEF. PECiIAL DESIGN PROJECTS. W20224 C-9MANAGER OF CONSM ~CTION. E7824 C-9PLANT SUPERINTENDENTNErS. w5S6i c-c
Yes No
No
nU
if fwn#r
HIURAZINE STORAE TAN
-I. STORAUGETANK
3 VIT I CATE
30-22A ZINE 5-A PZ IZ NK IIAE U AZ N ' S£N ! BI - B P OI S E NN P X
CAPLI17S GAILS US CAP ITS SAILIIA'S .U 1 Ia -S. 'R3"211E
6I3Z 63.515 1 i* ''' ~ CA ar
NYRZIEDI i T ZNEMT.AA IN PAMON AW LA
3sU-4-11w l -"A l ', sl 2 2u 0I MI L
0), jups
I IMI MM PILMEIRW 1 4-
I-AuV
OUTSIDE CONTAINMAENT
Si~a--1~S~jINSIDE CONTAINMENT . 1VISP ý1
car III cm
ASS 6
1. PREFIX VALVE UASE 011551AM IETT M IESAM vI I ATIMOOVOTE INE MIT 0 (I SIR ) A. mM TNSSITIGmG (36) All UMI,
(I-Ms-m2.36-u-.i (I.) aU mix m commm.N, mu off$I-M ::T 2
2. ALL ~S AMSW lIPING SINALL MU. iVALID 0ErniE *AS IIVAMU3. ALL FPUta. BAa VALID SAst1/2,sam VALIDVK .$"win GIV EaS.
& ALL TILVIS At[ TO SAM SIZEASOLPIPINGA flA SSICMMONA101173.S. FREDDIE ES AN M SIa VITE CAIIUNWT-rp f ICAS. oU n PIITavo
6. ALL VALUID I~tLNATE USES!TAM.I. <I > MICAimTO VAPIPE CUESSIFiCATm U SA S AA9I"-.
a. AsL. TAMn 51. VIE$'MAIN. PI MV CTIll PIPI EIE 0GNED IAISWMICP553115.I POP. TEST To IS PSIL
11 ALL EMTLPIPIE PFM MM TOis MUNUTE lS! S ESIGNED I= =AU ID1 70?. TOT To 525 PUSl.
IS- ALL SUPPLY PIPINGFODSPIU ru TOiAUXILIAST EllS.FUMTES P5W U$=lam,AVG ISO$4ASAU ALlATO DESIGNED I= G FOOD.1V7. TiSTi ToIS PSia.
11. SALL CSEERAITEPIPING EPLYNTAXESiO A P15 ESIGED FOR aSO PSI.TsF.TESTrTOiS mPAIS.
"ASAIULSEEl OA MIN03
SlUM-IG SHES l---- TAWALA-10VALVE MAKERSTAGSFL-': SIP- "Ago - lot-'S
470101-1 ----- FLU AIAGASA - AUXILIARY FEEnIATIA47VM-1I----- PLU S IAGAAA - CONSWENAP!4711111-1I ------ FLON OAAIU -AUDILIART MILAN47MI-I---------- FLOW5IMAAM - SGAM SEAL SATESI?VISI0-IA SERIES- - -- iEINSIAENT A EAIDC.L SIAMM479511-MS SEES - -- - ASAIC DIASSAIIwCmst ilES----Ff31510 iATimm
SECSUSSP UICAL FEED
P551-IaSERlES - -- - IE011T5 TA.NIATID,30017SEIE S ----- NTIMTASTIONE PO3 & . AiSESFITI S~
12. 551.151VALID) OR NYWAZINE AMSUIA FIXED 30ALL. K SEriT IT1EE(IELAS FOLi5Wt
PPA RELIEF VALVE SICTINSa a.5 m
IAS "Mc lamD5ISO
Also Available (OnAperture Card
F -3SO
UINITS 1&2
FLOW DIAGRAMFEEDWATER TREATMENTSECONDARY CHEMICAL FEED
WATTS BAR NUCLEAR PLTENNESSEE VALLEY AUTHOF
coYisIoSmoE NGIN19RI45 G SaSuS
'84021602~-1.
APERTURECARD
M YO0ZI E . A Z I N E 3 7 0 R A CETD A Z I A A I S A A TAA NKI UL A O I I
AlilGy IO 15*1 .WNIi
2-oil
Vtair
3LAI , amosort TN26-3 HYD AZINEi
511 Bit- WT I CN7MC
CAP5110SAL UNT T UNI IUUNA I3UNIT2 3 30
SITCWTa TISIPA
U K ~ ~ n OLERA -on v AN1 . .W OILERS-MWTI
7:Lww SO s
1. WIRS!PALMIN=moAN NSIWIW AU n laamryEliaa N fM"im'"71To To ff (I aU2) AN IN *112gnu (36) A AsNLMUS
tr4-U: --awM 1) ma oil ým .S. Mm amr
144111UTET a
A. ALL WnAn 5N25B I0710 MLLAI t ALED Ua UTIM An SIUSUM.I.A. ALL M SmS"M TALUSAn I I7 mUS Tam Sam IE ulUmc ALL "L7111AM 2&98suit323AS WIN in$ M ISK iN NIB1- IN==MUM AM aim VDAUSAoMI-nw SIICAL MIANI 111SIMITS.6. ALA. 06210 =ILL AAW U TIAT. <0i> SiNIATITW VA PIP! @AUiFICAIiUAS U0479115.0. ALL TAED. 0571. IMAIN. APP Swif INUSTI IiU 1MA S WI f aWD
N. 2Ff. AV.570T16 NILL AL WLT M PPi~ING UN 5MWIN To ATI 35=WW*0ISM USN30ph
O 0 7V. TUT TO1SU5Nil.
'(I-ALLUM 5*FIV *if iNma lTO A U 5*11111 OiNF030TI M POP mulaAUm 'IN A AN Smat~l MIND INM E S oil 0 .F. 21217To1 ISl.I
WV. AUEST 79TI711 W fnil# S ol u UNNl
TVA ARKEEECE STOWiNS425052-2 ------- FLAW DIAGRAM-- WET LAYUP ASVS.
97003-0I----- FLU 01*1GM - F TiS470$-0.2------7FLAWUSIAM * U-SAILlIAST P0155147VSI--i---- FLUNDIAS" I- OMT0 I - ------- FLO SIUIS- AMILIAAI 1IhiL&N47AMI-I------71FLO PIANO-IUSLA-SAM NAM*247NIC-0 Sl~ilS- -- - iNhUMI AU NTSSUItE.0111111-3,1 IIEiS)- --- iINIC PANOSINAI 232----1 a -F 1TU 2501
V11N0-n USIEilA- - -- [ 2M7 T MAWTioOTEII *0100----IormwSATION mS Ua IUTIFIASIUI
i.MLIVP VAtVID MVU122 A1"MIA 15PUSS MAL ISITNINT UATMFIELD)
Al 11VALE 11311
PEW MLII 3*12MeT
Also Available OnAperture Card
CARD
. R.
I
1-452 1C-4
LCASS UIL-IARY 5105r
'SAI
LR4ITS 1&2
FLOW DIAGRAMIFEEDHATER TREATMENTSECOWTARY C-HEMlICAL FEED
WATTS BAR NUCLEAR PLANTTENNESSEE VALLEY AWIIORITY
0011i055or TAAIIIN SG 2(21"131
840 216 029.4 -0
T1.'NIAPERTUIIRE
I
ýi.
I -CO8MLV' j~
11176,15jj=89 3R25
i . . . . . . .-
535366 VALVES
OPEN 6'ýMEA5
5644
LAST NO. U5ED
63
53RT8. U633
LATOPE UBRSE-
D-1
1161 111 111 1 6 II~ I t 6 I I - S 9111111 I 11111 1 I - I I I I I I I I I I I I ILt L I I I I I 1.1 L.J......I. I.......I..~L I t~ I I lit 1.L~ t. ~ [ .I~ I I i i 1LL I 1.J.....I...I......L......L
"PIT..
385340 034(74 OUTS[ REACTOR0
CLASS5BIDJ ID CLASS 6
3*5143"
S i ip i- C- W-1- "A
-18.3 RED.
DJK 406 OR3F3CE i6T/23r ID)
3AV.4 RED.
3Nc . 0V (ONDEN5ER
3-68 0EV CEOSED
3 IS I400
40LO T.
EMY4 IE[OV(
3 - -36 39 3.694 C 1-61.43-652 C -6530 34 (00314rFE 211313_5Z 34M3 68 1 -61 \( 3.82
6T3457 .571 L0 'T5
_3642 I - V I m A"1m6. -1 35 PAWSS KP
P.L(LINE 3-LIN
3:286A TELLVTALE
3..2LASSBYPASS AON
L4P NO.-32
3-CLASS B HCLASSSS L CLASS
53
TOFT 329.FE I 694-621" 463
VIOTSCO(COAT)
IL RLEPLACE MWMI OF006O.3I WT.56ARE FROM ICMp, CON6TRACT
NO0 78K38-821635, Y3535 CORP.661G 3.203
ON 33M7561 IMW OR610 50.43-2340 PER353.
of OP b2-1. 81dmdwP* 38ll- Py "ý
08'$OPA ý0 "7004 ,33A AO7149 A-6", ECA14069. j/
40 406 L MCl AP. 7A Ft.6 1
3-3-9c
353- -?
3.14 3-53
PI 3-262A.I6U w2P
HEATENT A-]HA 6I E -3-261 IT EL I t 6~EL 71t:9- /-11ltEL712:9-
3-4 AS 4011 163.0FR.P-52 PAS 64636
3-66 . 51 363
3.2...1-60 .- 60S
364(82(03100I.MY)
FE 2
TO IT J-646- 1-6" 3.6 ý6343-644
3-636 C
3 0A13I: 30SA
CAUXiLtARY FEEOWATIERCOUT ON 41waM.z -13-3.7 3 C103
CLASS 6 S If j _P(_3L.T I -1 1 3-604 Ila I I
306A
3-A3A ICK CLOSE VALVE
3: 3-A44 L' 1 3- 7 3,47I
,:M7 A_, 3 FE I- BYPASS
I
3.AM
TE 3-27
539
3- Z'DR Z.
It
STE. ant 4i Pt It 3-531
1. BOP YPASS ((UT.
3.8N 3-251A6T
33SF.
/'A9 3- 0 O4NO4I4'0.6.V 33651
Z' 31'BR-AIN27 3-5I 1 .603 .62 050 GOWOE
I-$" -w 3-1 Q3. ALL LVALVEA . . RPEI3-A. ALL P3SS TO6__"ASTW
C O N ES .IL, I6I 1 0 B YAA S
I3- IIC.. 2-REI 'MI
9. 133 *35EI S7
SN5013PAMLEDRF30ALOTSIBPIPINGISTV16 66' SIG.T A
A, LS SICH AE INLOtVFORVAVOEWANGE330
3. 729.0/ 0 10. 0
360'7340 VTER CACOI 10 E RATIAC E CHAR5
64 . 5474 3(74
MCOIELL Pp p
O3SC6RA C40 V . o54- 40141LL P33 013066
WTOR MITI OWV2.3 S
P
2414N
V A
3-7V
ON RAI 3EV 5
I P. 6340 "LEN 18%38638T
ILT2. 1ITIPI
'0'CA 30
S364-530 54533G ? -%
(WIT ~ ~ ~ * 0.54. ~ . 456..' SM.674476
44 5R0(7 7 66453063000 06326323336 3.flO. 8A5155 O 56
.Ml.I040.0jAR I W, I I
1 23 34 I5 I6 1 18111 1 1 1 1THIlI ORAWIMFOG Is UM.O(RCOLIFIGURATIOM 6COM.TRflL
63M O473 -SE --I --S
406040-T1A35630 NT
S,~Z
KESI 54031.60=ASTEWRAT DATA
t140 m506m P4s5440 6S306 TEWERATURENo. 355363 (1)
33i5 A65
4 350 3IN
s 440 340
T1AIPERTURE
CARD
Also Available OmAperture Card
WE SAM SIZE AS THE PIPING MILES55OTHERWISE NOTED.
AGE VALVES AWE I-56.060 UNLESS OTHERWISE NOTED.IRS SMIA WE P EF34ED W314 THE4M33 NUINBER.
36A CLASS 6 6ND N PERW 760347 6521-1, WITU CL.. 'S (HANGES
WEtV IS LOCIE0 CLOSED 440 LO INDICATES VALVEO1S LQUlED OPEN.
ER TA9 EIST SEE "US5BAN MICH. 1AL., '6315668 .P 609640D
AES L3361 8366R CCWHTESP836080 3 31508DEIGN635,1.4AN-3NO TA IS 5SHEE1.
3065 AME I'DOUE AND 7TOW O03ALL 0D.A3N AN0 VENT LINES 33003013 ON6 LASTESHIAtt WE THE 54338 AS 1330PROCESS LINE. -1CWALL AC RUST05A33C lESTE CI3CU ,.WH.'-511",LI, 761%3AOL3640-SLEETY RELATED P733MG 5386LL AD EiSTEA-10 2755690E. (4050 SIMALLDETERMINE IF THE CS'3'9EIN THE 3333I '"' OWITS TO 3313 U50OS36TIC TEST. ASK 8CODE (USES.16131c TEFSTING My48BE0USEDIF3IT EN S APPROVES 50E3R
F LOW0606 GEM PA NT 3. SYSTIEMIPSTRM36CAT.TU" S"483S AND 3.0.INSTRN3NI 30634330L DOIC 0360068(50ATM 03AGRAMFEEEP.TER SYSTEM PIPINGDESIGN CRITERIA 40FD C0A F 11RTCLASSIFICATION6 OF PIPING. PUMPS. VALVES 3*33 VESSELSSANPLING SYSTE'
y.'8~J
640(0 V400STATIC TEST T 14 0)E 3 ,%(6VALVE W0
3. .S. . .483 . . . ..3
1 SCLE: TTS BRNC ERR PLWIANT E
TENNESSEE VALLEY AUTHORITY0-864610.3orC61I6C"ENf 0DES'"
KWOXVILLE 1 1-6-72 1*I RN I m17WQAM%-i--- -- --- -- --- -- --- R 5
6166111l41 6~*1 NI.,. ~ -i:: .. lf i~l-I 11177,m'Il
1~ a40NM0J34014 88 38CR INS 3030 9450 ~I
-T- -aw
8402 160294 -DS
41 1
I I
-E7
6-, P- m- . . ---
I
L -4 1
T. Ft) I ý-Tz _; ýý
WAIN0STANVCEC9ONTSARTES
CM00 .6S106TPLPtfi SfUFF36C6001 1 66013
TO
I - _______ I
LIU~MZ~ iwrn~i91106423
IE-417 21-47ZU/NIT I
NO? AlVal£cxcpt as ,noted
Cop...4.. Dya 47W401I ~A~..Eh8 KNOXVILLEIL-J.77 Va~I U 14 t.47W401-7 or,
I .
ZE- 00& /5 5-answ R
41 AEWW AL~r 9 ASEC aTION-0A0
A&FIM Al? X 0503
AAR
I A
4- , 3-41,zP
A--A,, A-
Ar NOA
AI] 4.'0.-
A* i s Zz/ SW* !,wECI 27 l e N 3 a P rzr-iPL A N E L 7 9 0 t~ v
2,v ,
r- Mt .,... ., 0 N.r ..... - S.. Sh..t 1.
SLXW-1/6 VACr
MPAIL AT7
All? WSCALE
IREYAlo Xvailalble, (Y.
Aperture Card
11 37.11 112 4-13 1is, IBA5fl74I44U I - J015W I I I I
--- twU'w*LS ------ --- - a. ...A. TApuNIti .E et.------
ULrr6 1&2
M ECHANICALFEEDWATER PIPING ' o
WATTS BAR NUCLEAR PLANTTENNE5SEE VALLEY AUTHORITY
DIVISI~ON orENGINEERING OC SIGN
SUBMITTED f4,P'(OAPPK4O
8402 l 6 0 2 9 4 m-of
- - (ý.) --m-- -, nri.
'-A7
forts:
77 res Lm t I- VW40itý-
7
4.4 1
__________________ - L ~ .- - ________________ L -- -... ~.J ,~VAl
LLt- S&I - a S&S
aASS8
is -0s". klý9%7 Is -Oýw
U-0541
Ic -054r.
w a FRTI 11 -02L-011.6
(,DkE7-A91
ZE-056f
12E-03(,411 -054
9 UVIOS 2z
Al
41 rlrr IAYW
f cowravOwas-S
Is-AwUw3)
r ~4WETLAYUP ICcPdT0N47W4965
I
;Ch 37 C03&ý*wtsn
-S Ow cvf I vayrp1 7 -A;
orAPE ose o owu- 007--.
6-053 ~ - Z6-0Z
- te41 -
i-DETAIL 59
16R0512 I-'a
1le- 0544 *, Fff/64W TEM ~ jrjU-_ _WIVzVW46-
-I-I £ I
______________________ I *' I* A I- ______________________________________________ J
"AMMOPLE 5mf r./icsobolw iOC¶ AEr
DETAL A9NOT TO SCALE
ASEC TYOA' C9-C9WlT L4IW COWRWLNVlAar 7v Scut,
ze-t aall
/IE-0680
ZF-058
DETAIL 59LOOPW2 UNIT 2 ONLY
PART14L PLAN EL 7290WET I AS SCISStNT OP om
CO~fAMGE 055547W401-1-8
'Also Available OnAperture Card
- -- --- ----- -------------I
SCALE SWdB-e EXCEPT AS P0TEO
WEACTOR9,V
LINT I a82
WATTS BAR NUCLEAR PLANTTENNESSEE VALLEY AUTHORITY
840 216 0294 -0..T3
APERTURECARD
NOES:LFOR ROMESAND RE1EWNCESSEE S5*MT17.2. MFORM"-s D0*0OF CV-3- '85,186./07
I/M SEE LES41F CO. D"6 7175#30Z0CoýT 77-1822950- TO2OL VA4LVEWC16MT
300 CC3. "CID TO CAWP C0AfCRr&SPBLOW
VALVES To P~AS C4EA(ACrIF R~OC2A~fD!. MlA A*RA I OA FOVER RF~OBCOaA840 IS ROAREO.'g
0 .7 CurT *aA.# s" 470001-.7,10R "AIATEIEFOR
020146 SAVWfON GMI7OS SffA.
I
TLLi
tWACrOR 0 DG-
1O 5 Z 0 DtjI 2 4U I ' M10520.15.1000
TELEPHONE MEMORANDUM
DATE _Jan,ýry 3, >.
(TO) (MU H-.E. McConnell -TELEPHONE 615-632-4450 TIME 9:15 A-
COMPANY Tennessee Valley Authority Cc. H.E. McConnell, TV:
RECORDED BYW-J. Zidziunas LAA( R.F. Blaisdell
PROJECT WBNP - Independent Review-PROJ.NO. 10520 PDCA/File
SUBJECT Finding Report Responses _FILE NO. 15.1000_____ ____
I called Mr. McConnell to discuss the following findings:
1. F300 -The original finding was issued against drawing 47W854-1 Rev. 8. The form3 cites other drawings which have been modified. Since BSV does not have a COPYof the 854-1 drawing and the'rresponse forwarded only partial-drawing.-copkes"; weare unable to relate the information. Please provide copies of drawinrý 47,T 35/-1Rev. 8 and the current revision of the drawing which shows the changes. Al so,provide copies of the 47W803-1, 47W401-7, and 47W401-9 drawinos which show the,area where the changes have been made.
2. F502 -TVA submitted internal memoranda indicating that the FSAR change had been-& ~iestd but ddno indicate that it had been placed in the Commitment Trading
Svstem or if the change had already been made. Additional information is requested.
.3. _F925 - There are still some discrepancies in time that are unexplained. This may--be* do 6-t-o dela-y-s in -communicat-ion betwe~en -the -site--and office. .. Please look :..to
this and provide input.
4. F976 -The partial drawing forwarded by form 3 does not contain sufficient drawingarea to show the change. Please provide a copy of the full drawing.
Homer ind-ica-ted' that -he- wo .uld be sending a-revision for' F894 concerning the checkvalve size.
I advised Homer that I had been in contact with Mr. G. Beasley late last week andhad-ma-d-e "arra'n-gem-ents' to r-e-view-cal-c'ulation-s -fo-r -the F508 response. Copies of thecalculation were to be sent tot.&V' along with data in support of actions taken on-theDR eT- _
~ fiding~hrestill o6utstanding-and a-brief status of each was provided.
I made arrangements for R. Gross to call him to discuss G901 at or about 1:00 pm
12 -15-pmi--I returned Homer's call of about 10:15 am and we briefly discussed F718 and the-informarioa-needed-to put the response-into perspective.-.Homer advised that-progress on-T502 had passed the point of processing requiring aCTR. The information provided was that which was sent to those who actually do theFSAR-updating.-
(TO0) (EW)-
COMPANY-
RECORDED BY
PROJ ECT
SUBJECT
H.E. McConnel
Homer indicated that our letter dated December 16, 1983 (10520 DIN 1054) had listedF329 in lieu of F328. I confirmed that this was an error and indicated that I wouldadd _a notation to our next transmittal acknowledging the error.
-RECEIVED B & V--
-- J-AN G4 1983.\ ROJECT =
TELEPHONE MEMORANDUM
2 DATE_13 4
1 - TELEPHONE ____ _____ TIME 9:1i5 AMXk
PROJ. NO.________
FILE NO.-_________ _ _ ____
FORM 310520DIN510510520.92.0000ref: 10520DIN3527
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number / F/3 /0 /3/
Comments pertinent to finding:
Black and Veatch identified a discrepancy in the FSAR in the "time untilcore power decreases to auxiliary feedwater removal capacity". The Itext onpage 15.4-21 shows 1679 seconds and Table 15.4-9 shows 1860 sec. This"time" is not a criteria for the system nor is it an input to otheranalyses. However, TVA has requested Westinghouse to supply the correctvalue and the FSAR will be revised when it is received. We expect tosubmit the FSAR revision by December 30, 1983.
This item has been entered into TVA's Commitment Tracking Reports (GTR)system and has been assigned number WBN-R267.
¾ rga/em Member-Y/~ 2& ~
OEDC Program Manager
cyF A C QChairman, O~kD3 Policy Committee
ate
Date
Black & Veatch ,
Classification: Type____ _________
Black & Veatch Senior Review Team Chairman
~-
Category 6',
DateP
Date
NLS FILE COP'(
Pi A'O618 (EN DES -9-83) COMMITMENT TRACKING RECORD
3 DATEFILED
4 APPLICABLE TO(PLANT/UNITS)
5 IDETCIATTIOMNUMBER
7 SAR TECHNICALRESPONSIBILITY
8 NLS
RESPONSIBILITY
Z<K Afoap ýe
10 TRANSMITTAL RECORD [FROM - TO -DATE (MEDS ACCESSION NO.) - FOR NLS USE ONLY
XiZ- Po 0lo
11 EXPLANATION (INCLUDE A SHORT TITLE FOR EACH ACTION FOR TROI SYSTEM INPUT) -THE FOLLOWING
COMIMITMENT(S) TO NRC WERE MADE IN THE DOCUMENT/MEETING NOTED ABOVE IN BLOCK 9, "COMMITMENTLOCATION":
(6") Secttr~. cvcrec-,'V6~e- 2 4 ~ ~ S3 ,7JF~
re~ ni &-6 f)~ v va- a/
12 RESOLUTION (FILL OUT ONLY AT CLOSURE)
DOCUMENT OR SYSTEM TRACKING DATErnor~I~Y~! I I
(STATUS AND INSTRUCTIONS - OVER)
-L37
1 RESPONSIBLE 2 DUEORGANIZATION(S) DATE(S)
ACTION (ORG - GROUP -SUPV)
(2)I I(3)/ I(4)I I
9 COMMITMENT
LOCATION
menero 7rl-d /n /-J,. Ljare-iso 7;s5c !_.-L(5eoel A/;,
ENTERED:OR Pt C-lelluG COMMITMENT: rDOCISYS:
FORM 3 10520DIN508410520.92.0000ref: 10520DIN3548
WATTS BAR NUCLEAR PLAN'TINDEPENDENT REVIEW
Finding Number IF / 3/1 / 0/
Coments pertinent to finding:
TVA' s unit 1 corrective action is complete. Drawing 47B427-513 R2 wasrevised under ECN 3511 in order to change the Z direction of node 122to the Y direction. The document was completed and issued October 31,1983. ECN-3511 was written to address all Black & Veatch changes andcan be closed when those changes are complete.,
TVA References (ECN, NCR, CTR, etc.):
EGN 3511
Program Team Member
OEDC Program Manager
arman, OEDC licy Comittee
3te
?1- 9-13Date
Date
Black & Veatch_ Aý a4a.;... e,. /ao. ,&1,- GA.4 x V
19vA4A _., I-c.44.. ,I 1fc, Aa~&Classification: Type . Category
Date
Black & Veatch Serijor Review Team Chair-man
:-rE.4N -ESE VALLEY AUT14OR rflY - .ENGINEERING CHANGE NOTICE NO.. 35 - BAC
DIVISIOPI OF ENGINEERING DESIGN - - .
- ~~DATA SHEET NO. I'. .
- , Watts Bar Nucreer Pfat, Sprn PACET -~ 2j~9fProject Manager:SJA,Jfl -J ~ Released By:/
_____ ____ _____ __-.Design oect Manager..
reiiaring Section ~ ESA~sinN. --- McDS Accession No. --
reae 4WS3 ~S2 .- ~BP--'3 .- ..-.
otaIPa4"(RO):. Rdz WB:3O-.-.i- ~ 6 z 7 .~ýupervisor: - - 2 .taft Eng. or R~~Rj~~-- ----. ~
~rhitect: Wr-Y44~J' 6-P YWhP ~10
,rojec _o;~ T ~ ~ . .
- - ý. -.-0-.18-.
-7 --- 3-.
ch _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ - - --2 '
-..n . -
ýhief:~ t bae
.. . . . . . . . . . . . . . ...... ....... 14 -
:'-'E ASSOCIATE- DRAWINGS LUST.- REVERSE SIDE-.--.:
V. DOATE RE.SECT. GROUP WRAN-CH ECN D.P.
D_ ISSUED AREO SUPV. HEAD CHIEF CLERK MGR. D ESCRIPTION OF REVISION. OA
____ ___ ___ ____ ___ ___ ____ ___ ___ ____ ___ ___ PAGES _
7 __ 7 Q~d~ ' ~ T ~ - - - .
9-14G3 YM .•ý••. ::•jsm AD W '3,4V 3 4 f IC&-/~ I r 5 ~ -
_ :.IS EM .C Lad
q-2a nfrmatmo ADO. 06.--.-&____ 5'____4A_ 4,O PAC - --.. .x.,..-
TENESEEVALLEY AuTHORIT'Y ,ENGINEERING CHANGE NOTICE NO. ---
*DIVISION OP ENCINFEERING DESIGN. _L- -- . ~ DATASHEETINO. l
-UNIT -- -DRAWING OR B/M NUMBER REV. EXPECTED -ACTUAL -
- it, .Cv~12
-PAU
N DA
W4,7 - 1-
q Q-4 -7 53 -3 44
-~~ - R~
NJ po7r3 -73 K1_- A
________________7--7
I A -, I I I
-\_2
7.- F_ Y~---' ;: 7V Z~S~--4.-*- r~J ~
- -r
* ~ ~whaI'W
_________________7~-3-X3
+73, - -7 -ý 3F
A ---~ -~_ 777__7
__ ~ gI&~ ___
-' -II
04-713_____
TvA 20575E (EN OESý-7.9).,
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
:ENGINEERING CHA NGE NOTICE N'.O.3
DATA SHEETNOLI,
1 i
DWGISSUEODATE --
DRA IN MR 0.- NUMB. IREV -LLJMACUL REAK - REV. NO.4 1 - __ .-
8 -7 35 i77e47-~
- 7 V~~/4 2- 7 7-` Th
~ 17 71--'.
S-- f t- .- _ _ J.ELETE-
*~~~t I 7 '
______ _____ _____ _____ _____ _____ ___1 4 __ _ __ _ __ *
_ _ . . . . . .. . . - * 1 _ _ _ __ _ _
F.; ____ ____
PAGE 7
A/ z - le - /) 14
ýINE UPDATEDDATA Sklý
?ORX~ 3 10520DIN521410520.92.0000ref: 10520DIN3538
WATTS BAR NIJCLEAR PLAN'TINMEEFNDZINT REVIEW
Finding Number / F/ 3/1 / 9/
Comments pertinent to finding:
TVA has redone the calculations for the anchor load table 47B427-380 R4 andissued the subject anchor load table October 3, 1983, which created a newroll number. ECN 3511 encompasses all Black & Veatch changes and cart beclosed when-those changes are complete. NCR WBNCEB8233 and NCR WBNSWP8309were written to address the anchor load findings but cannot be closed untilthe ECN is closed. The unit 2 anchor load table, 47B427-448, that wasreferenced had calculations in place; therefore, no corrective action wasrequired. The unit 1 anchor load table, 47B427-380 did not have supportivecalculations. Hence, the calculations were done and the anchor load tablewas revised.
TVA References: NCR WBNCEB8233, ECN 3511, and NCR WBNSWP8309
Program Team Member
CA r4~$l~~OEDC Program Manager
sz, 2- tzate
/1 ?7-r~3Date
Black & Veatch, c ,A 7# ) J~
Clas-si-fication: Type~"" Category ,
Black & Veatch Senior Review Team Chairman
Date
Da~te
DIVISION OF ENGINEERING DESIGN
NONCONFORMIANCE REPORT 1 a 8211 7 022WREPORTNO. WBNCEB8233'
271 PLANT Wa::s --ar UNIT 1
PREPAPERI/CRC-AN;ZATION/DAT5/,2 WIagner/T-PE-CEB-PAS2/1',.9..g2
DESCRIPTION OF CONDITION
Problems N3-3-13A and N3-3-14A are unit I and 2 analyses. The uni.t 1 anchor designfor nodes 14C, 295, and 310 does not have calculations to support the anchor loadtables. The present anchor load tables are nonconservative. This may not be theonly occurrence of this situation, hence further investigation is needed.
:6 ATE OF OCCURRENCE EST-( )0,Ac.( 1/80* SIGNIFICANT CONDITION ADVERSE TO QUALITY
1_W OF DISCOVERY Black--&- Veatch Review -ýPAC CHEFIDATEED A ODE (EN DES.EP 8.01) J RNHH IATE
IICORRECTIVE ACTION:
: CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YESf NO 5I3DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
'ID4 ECN' REQUIRED' [DYES -N00 ECN NO. 3_ cSCHEDULE IMPACT 0 P t3 A 0N
ThE AUS~(REUIRED IF SIGNIFICANT)
t~ TIS~SGENERIC CONDITIONYS O
*ACTIýON REQUIRED TO PREVENT EURNE RQIE FSGIIAT
QA EGINER REIEWAND COýNCURRýENCE:
LABORSTA ,ACT- f24 DATE INITIATED
124 ATIVIT NO.TASK ESCRPTION
AL EN2:ý DE ACTIO COtEE
GACT
DIST0RIB
T AFEs-.~SG
AT
R
ALN DCRN COES TOIO
COMPLELE
ZV5-
ENGINEERING CHANGE NOTICECOVERS14EET SWp W~ 0314 506
feCpOsf ISSUAMCE Of OPERATING L)CZMM
TENNESSEE VALLEY AUTHORITY gWtNoo.
DIVISION OF ENGINEERING DESIGN we bw atzC*~ !
Froe: CeAftVtr Proae MaegW
DATE MAR 14~ 9 r2
was U Ansalyla Requird Yes IW__
-- 4
SCOPE
DRAWINGrS OR S MoS INVOLVED yes Data ab'aEhYe o n
oDar Dataet RmhW~d Apr9 Require
S" .99- -o -
Electrical -i-
66OChanCUI
;.,.2. -_______
C9911. U. mop04
Mach t'..ýE
vve WIn.& psajirla l RaQwued #Of PSAR or TSAR Ysq
or.4 KlwýIT Required le, prpeato~ Twob
smovic""L pIf Yit al Torm No.
Vender B&Ck&-wWUI-k
S.4smic Anooyoss Reuore
sarsaCA. WOn ~lT boO~ eCCRE.n ctorfil rmen~ Report Required
OA APplif
--------------------------------------
cc e*e -
Woo ""111=C W~~ iltM wavJC?. emi
came. cc... 554am.
~NN5S~~ALEY~~hOrrv-. -. ENGINEERING CHANGE NOTICE NO. Z3/ -- ; RP'
Dlv LSION4 OF ENGINEERING OES#GN
S-. -Watts Bar Nucleer'Pfant, Spring Cih. TN E.. 7 -
p~~nProject_____ ______________ aleasedliy
p 2 G -9K Design oject Manager..
'reparing Section
1tepared.
otlPa~e (RO)42- ___ .1]4a~ft Eng. cr1 -.ý---L- -- : . .....
k.rectect: J2 32
SO WP--'833 r_4,L-5 -07WB -2:83 4 8--513.-
W.BR23t27pP4ead. XWBP<83080-8j,-ý2'2
,,- gn .
~WBP-83 0 89 >:-5-'03:.0 e' , ýý53QZ
WBP :83 f&173~'~5Q 5?-Vt
WBP I'83 1 :0 28U75 09-TNhet: ,T 'J 7 5 ] - - - -t 7-.-7-- 7 -.
-SCOPE
Troject E3AbFkLJI..I ~ L..r%~ Affected Units 42..ýy ste or.e3
teference &'Desciptiiii of Chan"_! ;7 ,4.J r-4=-&5 -QS U E. -r o7 UtV Y 2
0...
- -- ~- -~~-~---~ --- -,- .- ,-..- - - .-............ - . -.
S- . . . . . . . .
I
--........ 7- A..-- - ~ I7. . 7. . ... 7- - .7-77.A**~77- ~ A- ~ -'7-. ~ ~
.7,.' 7.
-* 77777 7-7.7,.- *-j* .77. -. -. . . . - ... rrA7--'' ..** q .
I:
tjt
.~--. 7... .- .- :7- SEE ASSOCIATED DRAWINGS LIST.- REVERSE SIDE.t
EV ~ R Ei-ATE SECT. GROUP R?0 ECIY D.P. TECIINO RVSO ,OTAL
40: ISUDAREO SUPV. IHEAD- CHIEF LERK MGR... . .. PGE
W2 3F_61IJ T- 2ap mg, Ycý Add dwn'C
r- (7_--_ iT•.i Q AsDO 06V&-5--dAQA 4,0,0 A,46- /R4r 3 -
lilE -cs DEET ..~,S,, ... I
-J XDD D W~1. 7)7 -
Is as folws :A.7- ~Aýu..UIR-ot IO nfofmatiofl - - -_--..... ... ... --- - ~ ~
9F-DTPANN AND CONTMO. STAFF. UIl2C7SC.-K-" - --- -.-- PL.ANT SUIPERINTENDENT-..A 7-77
M ErJ. *3cNITECTVRAL 3UPgyR PRMM vacua C-9 . - CONSTRUCTION PbOJECT .HANA*6U- - .7 .-E'* '-'.
:30LE. CIVIL UCGINEERINGC SftAcNH.W M22 C-4 _ 003. WIO V3863 . . . . .
:1I1kf,ý ELCTI~iCAI. £BrGIIENIU ORAflCS.-IC126 C-4 . .A...A.~*.- -A2143 64 S2-.! . ....
MIEF. SPECIAL DE51CA PIOJECTS. W20221 C-9 -.- .- ~ .. ___
I
-IW9
p . , 1 .1 , -
-4A
:2. nh--
TEN NESSEE VALLIEY AUTMORITY ENGINEERING CHANGE NOTICE NO.____DIVISION OF ENGINEERING DESIGN.- AA HE O
DAA.HET O
AFFECTED O -W -' -- ISSUE DATE~
UNIT-- -ORAWING OR BIM NUMBER -REV. EXPECTED -CUL
7 j
*PAGE
* - AT
L2zz 4-7- 6 43- -7-4
Taoý §55 AJL~' 3 ~ Li
7 -T -
"t- 4--2 M . -
T~ s- - zt-
7W41_ --1- -7 -- -34
-7
- -S..,6 -
I
DRAWtNC OR ~JM NUMRF~
ENGINEERING CH ANGE NOTICE NO. -3 7
DATA SHEET NO....Z'.
DWG ISSUE DATE-
TV.A.ýi575E (EN DES-7-79),
TENNESSEE VALLEY AUTHOR ITYDIVISION OF ENGINEERING DESIGN
PEUPDATED
- -. - -- '7
J~--.REMARKS~ IREV. NO.DRWN OR B/ NUBR Rv XETDIAT
(p I /~')-~-B~I /O~2~~3_j4~71A/4~.ZL.-o L -.:- 1- - I-
_7 Q ~ ''3 3,47
1L4 -7 Vt/:i7 -,:2-2/ /0l 38
7-'~ .7. ~ ~ x r-
-(,D In-)5879 ./04
---- .~~777~7- --
PAGE 7
CuTrT
Al? - -;ý - /jz
I
DIVISION OF ENGINEERING DESIGNNONaCON FORMANCE REFORT
MES ~wo N.SOP M8 0125 178
[21 PLANT WATTS BAR NUCLEAR FULAT
83ý128AGOZZREIOR NO1 .
P4. PREPARMRORGANIZATIONIIDATE ~. L. flieh/S~P/Januarv 25. 1983DESCRIPTIONt OF CONDOITION
Box anchors 47A060-3-8 and 47A060-3-10 fail to meet the stiffness requirements for theforce in the z-direction as required by Design Criteria WB-DC-40-31.l5, section 7.1.4.Revision 1 of 47A060-3-8 aliowis 25.8 percent and revision 2 of 47AO60-3-10 afllws43.3 percent of the load in the z--direcrion, applied on one side of the anchor, to betransferred through the anchor to the other side. Section 7.1.4 of the desigu~criterialimits a load transferred through anchor to 10 percent.
76DATE OFOCCURRENCE EST (X ).ACT.( 12/8/80
77 METHODoF DISCOVERY D'c; r,, r'a 1
WSIGNIFICANT CONDITION ADVERSE TO DUALITYYES93 NO71
I B~ *RANCH c~i4EF/oATEL~i.COoE ENDES-EPS-011
[jTRECTWvE ACTION
fl,
f- - -. f F 1% ME GUEST NO
't -& C-EDULEIkWACT f
i-:S-al
NONCONFORMANCE REPORTCREPO~RT NO, WIMSWM 0
ýCAUM:4 IREA.RNED IF SIGNIFICANT)
fli ,~.. ~ -- - -. -. IO YES)) 11011
*t ACIO REGUIREw TO PRE VENT RECURRENCE: IREOUIRED IF SIGNIFICANTI
IS*INDEPENDENT REVIEW.
120 LABOR EST.1 1. ACT. 4 MH SCH4EDULE EST. 1 1.ACT. IIDAS722 ACTIVITY NSO TASK DESCRIPTION 24DATE INITIATED
EMANARKS:
r~l OS~p~jTI~f 206ALL EN DES ACTION CORIILETE
ENDE PROJECT MANAGERACMSoeF. WellOFF Ica OF GA
______________
MamG4; -- *8RftAHiCN CM MQ DDAGATEkSM Ow 5qwam fCAswASSUT&ftT TO TWE MANAGER OF EDEC flwwt
m ~w %-~saft -aw iq-'ww kcal* OSrt&auTW AFTER TvQS StGf~tA~l
" S.NDCA.11l COPY TO ftl&ESN WESAC&SW
YES No "
FORM 3
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
10520DIN501210520.92.0000
ref: 10520DIN3549
Finding Number 1F1/31/2 / 1
Comments pertinent to finding:
The Findings.Report described that a footnote to FSAR Table 15.2-3 gave animproper reference. FSAR Revision Package No. 364 (NEB 830622 260) wassubmitted to the Nuclear Licensing staff of the Office of Power on June 22,1983. This mechanism is a controlled and positive closure system for makingESAR revisions. The Revision Package corrected the improper reference in thefootnote. Attached is a partial copy of that transmittal with the relevantinformationi' No additional action is required.
Program Team MemberA Z3843
Date
Date
Date
U±EiJL Program M.anager
Black & Veatch__ ~-
Classification: Type 04LI Category .6.
CA 6.4Ik & Veatch Project Manager
Black & Veatch Senior Review Team Chairman
f00,
Date
/ -I-3-Date
'VA 1013 (9NOii.10401
tCNr=Z STATUS GOVUCRNMNL'4
Memorandum TENNESSEE VALLEY AUTHORITY
TO L 4. ills, %anager of Nuclear Licensing~, 4 '830622 260FROM John A. RAulston, Chief, Nucleir Engineering Support Branch,
DAE W10C126 C-K 6(;XW7 i
SIJCF:~*&Li.. )q.aj.~La4' - FSAR REVISION PAQtAC V0 U3,4.-&C
Attached is FSAR Revision Package NoJ&& The package containsapproved OEDC design input in accordance with ANSI ',45.2.11 forincorporation into the FSAR. As such, the material should not bechanged substantially without the prior wiritten approval of NEB-NLS.
If you have any questions on this matter, contactat extension '111l
Attachmentcci ýal attachiments except figures
Principally prepared by C-r extension 7/ '/,
DEOS ;FSAR. It
~mummBuy U.S. Savings Bonds Regularly OR the Payroll SaVings P14n
TABLE 15,2-3
BALANCE OF PLANT ASSUMPTIONS USED IN STATION BLACKOUT ANALYSES
Value Used InAnalysis Criteria
y Feddwater Delay Time -60 sec At least one motor dri'ven aa~li~n,..
Auxiliary Feedwater Temperature
Number of Auxiliary FeedwaterPumps Delivering
Auxiliary Feedwater Flowrate
120OF
4170 gpm
feedwater pump will attain ratedflow within 60 seconds after ini-tialization of accident
(1200 p
Minimum of 1 train must deliver tothe steam generators
3-470 gpmG
*Section '6.4?gives the interface criteria ror- the Auxiliary Peedwater System.A -
Item
Auxiliar
OFOM 3 10520DIN521510520.92.0000ref: 10520DIN3542
WA=TS BA.R =LJCZAR ANINDIZIFINDZINT RL-VI:
Finding1 Number IF /3 /2 A4
Corments pertiment to finig
Corrective action is complete for unit 1. TVA has redone the calculations foranchor load table 47B427-382 R4 and issued the subject anchor load tableOctober 3, 1983, which created a new roll number. ECN 3511 encompasses allBlack & Veatch changes and can be closed when those changes are complete.NCR WBNCEB8233 and NCR WBNSWP8309 were written to address the anchor loadfindings but cannot be closed until the ECN is closed. The unit 2 anchorload table, 47B427-450, that was referenced had calculations in place; there-fore, no corrective action was required. The unit 1 anchor load table,47B427-382 did not have supportive calculations., Hence, the calculations weredone and the anchor load table was revised.
TVA References: NCR WBNCEB8233, ECN 3511, and NCR WBNSWP8309
2 '' _Arogriam Team hember
C~ O~ Proram anager
airmanz, "ell Policy Cc==*irtee
ate
Date
B lack & Veat ch -4k5f" VG4/10ý C&A O..V 4'Ppyv7'4:*~.~4'i
Classification: Tlype _____________Category 4
3d'fck & Veatch Project Manager
Sack & Veatch Senior Review Team Cnairman
Date
2-a241e
215e
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
CEB.9 2 11 17 02?En REPORTNO. ____________
ý21PLANT Watts Bar -F UNIT 1
ýF4 PREPARER/ORGANIZATION/DATI 1 JJ WgerTECBPA2,198
WDESCRIPTION OF CONDITION
Problems N3-3-13A and N3-3-14A are unit 1 and 2 analyses. The unit 1 anchor designf or nodes 14C, 295, and 310 does not have calculations to support the anchor loadtables. The present anchor load tables are nonconservative. This may not be theonly occurrence of this situation, hence further investigation is needed.
DATE OF OCCURRENCE EST ( 1,mACT. ( )1/80, SIGNIFICANT CONDITION ADVERSE TO QUALITY
F7 J OD OF DISCOVERY Black-&-- Veatch 'Review YRNC HES NOTR ODE (EN DES.EP 8.01) jýI _ANCHCHEFIATg -- JA~ La J/fL
2JCORRECTIVE ACTION:
RECTVE CTIO DEIATE F6M A DESIGN CRITERIA REQUIREMENT YS O
I~DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
ECN REQUIRED D3YES NOQC ECN NO. 3 oSCHEDULE IMPACT 0 P __A3OA
NONCONFORMANCE REPORT
!ID REPORT NO.IASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
15 THIS IS A GENERIC CONDITION YES E- NOC
18 ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
0QA ENGINEER REVIEW AND CONCURRENCE:
LABOR EST. ), ACT. ( )MH T -SCHEDULE EST. ( ), ACT.(
ACTIVITY NO. TASK DESCRIPTION DATE INITIATED
f275 REMARKS:
DISTRIBUTION:CONST PROJECT MANAGPEREN DES PROJECT MANAGERGABOEDC QANEB (for Significant NCFRIs)*MEDSNSRS (for Significant NCR' s)
* ISTRIBUTE AFTER THIS SIGNATUREHANDCARRY COYT NEB-NLS.
ALL EN DES ACTION COMPLETE:
-BRANCH C
/
KEL
ENGINEERING CHANGE NOTICECOVER SHEET swp 13 031-4 5O6
(9gEFORIE ISSUAIClE OF O4PEPIATING LICMENSE
TE NNESSE.E VALLEy AUTMORITY 4O
DIVISION OF ENGINEERING DESIGN 'Nf ba, At M' e
Frem : Dirvi P70 --t M -e9W A m 2 4 8 3 3 2P f f1 •DAEMAR 14 SM
was w Analysi RAqWw Yes__No__
SCOPE
Af"twIe~ & Description of Chaow FY
DRAWINGS O0 YesS Do"LVE Br anch entad'(Dar 01111.1- D1 Shet AppIWepe ftW'd(Daa soot Reuiril)No Available
CMIE-
Ebe~ctal -
/Jt
N ,C b~m event g ,, a . M il D ow
Jtwas Imaemness a. mo?
ks~chZ dAIwamData
hbCII ~ 79e NPkI Enpe'
S.iWM fIPM& ~GISJI' aCam Raguvir for PSAR or PSAR
0099641 Vist valwe?, Req.1.d 0? for keo-t-a Timb
&aevi"4 wpp Was-@ -f I es. Twil NO.
Voierea B'cahm" Imfoead
Seismic Analysis Remusted
-.- SC^L WOO VSUT ME OOfte MlfOAE: Nofconlorvrw~c RepXI"Ort Rquiedd
ft.00 . '-tj..7 ~ GA Applift
T-t L-6 sec~it) $ysten idiftsed S
.,a A 91t.eay o
CC ~~ - . ~~ 15) reClif. asset4as ~ AY.~~aO
mlC*Y.-,&tS Usesl
- ~a... ~ Ll~gl .... .. . C-4.~
me? emeto*.4d~~~ 1m. ~ alas wew
C.5w 1as.
-TENr4s VALLEY AUTHORrrV-Y- 7NtNER CHANGE NOTICE NO.I- - DATA SHEET NO.+~
TP aSOttsNGNERN Bar Nucleetr Plant, Spring Giy TN
Project Managaw.~ ~ Released By/A1, 4 19&37171. -.- i/-j,- _Design 7oject manac~er......4.
Ireparing Section -- ~-7-fr*- /,••515-- A 2. .z
- . 41
*u~ervisor: .-
7! ~
SO P'3Q ~ 50
-WBrP281,012- 8 fý13.I1 I
WBL83~~ 027, 5A
~WB~R 8310.-8 -
16
7P5I2
WBP ---83 1.0-l---"-3 -
-. R I-G--8:0-
- -.--.-- ~ - . - ~ .. COPE__ __
Iro e t V , T 7 4 J UL iL t 4 . A ffected U nits
yseforFeature.- , ~ i Ae -eference & .Deskcriptiriof oChange .--77-< 14A rý, .Sr-& -DUE -r- 6 lbz&
-~T - a ~ j -~ . - - - - ~7:7 7
------ - - I,-', - 1- -, Z-. . .
71 .,
I -I."
~ L..-.. -~ ~ - ---. ~ --7
-7
- -SSCITE DRAWINGS RE RS
DAT _ý .. .'CT *ýOu B1 PAGEN DP.
0]ISUD ARED SUPIV. HED CIF LR O. -- , C-ESCRIPTION OF REVISION.~ 75 -. -
-I4r83JH N JrEm t-rf- -M %nr--rl-r.,rLI - A
Jl P-~ -K I 3 em Tic gD- n -Ld/.r q-2e6-931,MC tý -Me ~ c -. 1t)01-
~ ~TJO D&9&-5'SAAW 4o10 10 / &~dI 3m_ rD D ~ ..___ , DTiq- Zu s I .
1%-*ý T ~ f 7 - - . . I-s as foliows-
t7~tfomto - 77,t_ _ _ _ _
: L 5-.- -
NICE. ACOSTT PkN il AND CONTROL- *TAPT,:WAjC7Z4 -C-9STRCTIO.N SPE'WCT~~g---.~ sMIE, ACHIVTLECTUIERAL SUPPORT V922 C-KM CONSTUIO w5S6ECC..ýN . .-
VIEF.- ELECTWICAL-ESINIEEUISG SfACI.62 5 ... 3.-&SaC 3--------- -5-
IEF, SPECIAL DESIGM PROJECTS. WZD224 C-9 ,4
-5 n
'rep rediy:*.*
otýl Pa4es (RO)ý.dz
JR1
krchitect:. Z -Z 2
2ý
.77 ýTL-- 1-:r- -, -. ;
~.~ENGINEERING CHANGE NOTICE NO.___
. ~~ DATA SHEEi NO.':. AG
AFFETED. Dwa ISSUE DATE LDNA'DNAT-N OR 81M NUMBER -,EXPECTED I-ACTUAL- REAk E
'A .3. -- -93RE
v'-;q~ -7 A - 2 --"-
IIVqI7,4I -"I r- I.1 Y .---- _ ~~~***
~~ 1- _ f--3- -7 3
Cc Z -----
.2-I . - ~.-;2- ~ ~ ~ ~ ~ v no .. 0_1 ~ _ i -7?~:Zi
oe. I." I J L F/ ~-n /Oki f
____________.3r_ 3 /0;
+73-:1 -7;____ -
TVA-10CS75E (EN DES;.7.79).,
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 57/
.DATA SHEET NO.-Z.I'
* . - -. - DWG ISSUE DATE-
DRWN OR BI NUMBE RE -PCE REMARKS i-RV.
SINE UPDATED:DATA Sl-ýT
1 L7W4-17.. 2D/ "0o3{ s-~4L4- 64-17---- 3 LJ:1s 5-L
-7_ -:ý23
-DE ET A rLV* -sA-lA
tp I - - -- 8
-~1 --- .
PAGE 7
A/ ? -- -;ý - /ý Z
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
MES amto N.SO '8 0 125 178
EDPLANT W~A~rS BAR NUCLEAR PLA1~r
83ý128AOOZZ 0.1 UNIT 1
td PREPARER)ORGANIZATIONIOATE R. L- TliehISUlJanuarv 25. 1983
Ele0SCRIPTIOOV OF CONDITION
Box anchors 47A060-3-8 and 47AO60-3-10 fail to meet the stiffness requirements for theforce in the z-direction as required by Design Criteria IJB-DC-40-31.15, section 7.1.4.Revision 1 of 47A060-3-8 aliows 25.8 percent and revision 2 of 47A060-3-10 allows43.3 percent of the load in the z-direction, applied on one side of the anchor, to betransferred through~ the anchor to the other side. Section 7.1.4 of the designucriterialimits a load transferred through anchor to 10 percent.
LJDATIEOF OCCURRENCE EST(IX .ACT. 1 12/8/80
17 ETHOD OF DISCOVERY r631 L r-")
u NOCOoE EN OES-4P8.O11
is CORECT.VE ACTION
SIGNI FICANT CONDITION ADVERSE TOOUALITY- T NO 1
11
72 f E AC Q E*' O' I~P R( I e.-p I ~ W!
t-.FTIEQUEST NO
3 511 21 75 SC-COULEMPAC? I CA
*BRANCH CHIEFIOATE t;*a I-2S-8-j
NONCONFORMANCE REPORT
E RE~0R~ V~~WpS 3O~-2ei ASSIGLAm CALM: fR.IGURED OF SIGNIFICANT`)
YES) " NO I
ins ACTION4 REQUIRED TO PREVENT R ECURRENCE. IREOUIREO IF SIGNIFICANTI
Ctq *INDEPENDENT REVIEW.
20LABOR EST.( I. ACT. I I mm 2 SCHEDULE EST. 1 1.ACT. I DAYSACTIVIT'Y No. TASK DESCRIPTION 24DATE INITIATEDRlEmARKS:
CONST PROJECT MAN.AGER R. 1. Ilich, 375 CB-K ~ LEIUCINh~JS3P E PROJECT MANfAGERA
Of 0ICE OF CA
-. uzA&*BRANCH4 Cm4EPIOC. DATEkIf lfw~q I-Cg
ASSITANT TO TM! MANAGER Of: Of DC Kkcttv8-w %wow suiWe, --kw Sq-'.. NCR,
.0 0STftl*4Tt AFTfR TMIS SIGNATURE' A=& T CP TO outeSJL.S M tACE31 I
El REPORT NO. VRXVP8309
M17 rMIS IS A GENERIC -M-1
FORM 310520DIN515110520.92.0000ref: 10520DTN3915
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F/3/2/8
Comments pertinent to finding:Valve data sheets did not agree with the system design pressure and temperature.The data sheets were corrected by NCR WBNEEB8207 (attached). The correctiveaction has been completed.
Frgam/Team Member
6 cPrgram Manager
Chai an, OEDC Poi Committee
DateL9I
Date
D ate
Black & Veat ch 12J ý Ile 4.4J.i~
Classification: Type 47 Category .I#-
OPl- ~& VathPrjctMnaeBlack & Veatch Senior Review Team Chairman
/L,/t-7
Date
2- // S-'Date
A(
Z'
DIVISION OF ENGINEERING DESIGN
NONCONFORMANCE REPORT
REPORT NO. WBNEEB8207
D2PLANT WtsBr N ft~lear Plant UNIT S 1 and 2
D PREPARERIORGANIZATIfNIDATE A. F. Massey/EEB/11-30-82
53 DESCRIPTION OF CONDITION
The design pressure/temperature as shown on the data sheet for the following valves does
not agree with the Dressure/temperature per Drawing 47W803-2:
Instrument No.
PCV-3-122, 132LCV-3-148, 156, 164,
171LCV-3-148A, 156A9
164A, 171A
Contract Item No.
73C34-83577it
76K3-87379
23
11-1
Per Data Sheet
1635 PSIG/1000F
Design Press./Temp.Per 47WB03-2
1975 PSIG/1200 Fof
1650 PSIG/1200 F
361 DATE OF OCCURRENCE EST( ),ACT.(X) 11-9-82:7] METH4ODOF DISCOVERY~IC and Net~ tinE UNID CODE (EN DES.EP 8.01)
F-1 CORRECTIVE ACTION:
Revised data sheets submitted to EEB by SW? 830408 046 to change procurement design
specifications to agree with drawing 47W803-2. Memos EEB 830711 905 (contract
73C34-83577) and EEB 830711 925 (contract 76K3-87379) sent to PURCH to verify with
vendor that the changes will have no effect on the equipment furnished. Our investigation
has determined that the revised design pressure and temperature will have no effect
on the equipment furnished.
CORRECTIVE ACTION DEVIATES FROM A DESIGN CRITERIA I
13DESIGN CRITERIA DOCUMENT NO.
ECN REQUIRED QYES- ---NO3 ECN NO.
v~~fl lan ~X1
EXCEPTION REQUEST NO.
UA UA NSCHEDULE I PACT [] P
NONCONFORMANCE REPORT Z11qID REPORT NO. WBNEEB8207
F4ASSIGNABLE CAUSE: (REQUIRED IF SIGNIFICANT)
LaTHIS IS A GENERIC CONDITION YESUL NO rR
18ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
EDLABOREST.( ).ACT.1 MH 1H SCHEDULEEST.( ),ACT.( )DAYSACTIVITY NO. TASK DESCRIPTION DATE INITIATED
fiREMARKS:
This NCR is complete.
DISTRIBUTION: LM ALL EN DES ACTION COPYECONST PROJECT MANAGER BRNHCIFO.ENDE POJCTMANAGER
*RNHCIE/1GOEDC CA
" ES (for Sinilficant NCR's)*6 EEB '830901 944RS(for SignIficn NCR's)F. Massey, W8A1 3 C-K
*DISTRIBUTE AFTER THIS SIGNATURE*HANDCARRY COPY TO NES.NLS
7= _-
.7/-a- -
MED '83 1027(THIS BLOCK TO BE COMPLETED mY TVA)
CH A NW-1ýQt40KACT
Adoaess 81l comrufllc~t Ion except Invoices toTENNESSEE VALLEY AUTHORITY
DIVISION OF PURCHASINGChattanooga, Tennessee 37401
Telex 55-8417 Telephone 615-755-3011
ANSWE ASAC K-T VAPU RT RFCTA
Taelcopler 615-755-3214
CONTRACT NUMBER must be shown on allInvoices, packaegs. Sh~ipping Papers andcorrespondenlce.
VENDOR CODE STATE OR COUNTRY TVA REFERENCE NO=. 0CHANE
CODE NOC
BUYING CODE ICOMMOOITYCODE CHANGE AMOUNT S
I I I I 482o Wo ChanizeVENDOR REFERENCE NO. CHANGEAT 0FR C EAT
_________________________ 10/21/837 11/8/71'ACCOUNT NO.
PROJECT
Sequoyah and VJstts Bar N'uclear Plants
Leslie Company401 Jefferson RoadParsippany, NJ 07054
AUXILIARY FEEDWATER LEVELCONTROL BYPASS VALVES
In accordance with Lutalie Cnitmncln's letter of October 14,
1983. which is hereby made a part of this contract, we
hereby revise the design condition for Item II-1 in
accordance iwith revised data sheet II-li, Rev. 1, which
is also made a part of the contract.
MATIX.D. fl"CIMSING
~C 2 6 ̀ 83
Reference F. W. Chandler's memo dated July 8, 1983.
EN DES 18)Expediting
All other terms and conditions of the original contract and previous changes of contract_(i]
Previous Total
Correct Total
No Mange
$87,936.00
TENNESSEE IVA Y-AUT(DRIIR o,Division of Purchang
ByPurchasing
TVA 394 (OP-7-80)
ContractorAuditor
K~athy K. Holder- PM
contract FilePurchasing A File
Accounting OfficeConsignee
Requisitioner (2)Plant Accounting
521
= = = M M ýý
October 14, 1983 File: 369
Tennessee Valley Authority750B Commerce Union Bank Bldg.Chattanooga, TN 37401
Attn: Kathy K. Holder
Subject: Contract 76K3-87379Auxiliary Feedwater LevelControl Bypass Valve-Sequoyah and Watts BarNuclear Plants
Gentlemen,
The change in -the design conditions presented in yourOctober 5, 1983 letter and Data Sheet II-lA have noeffect on the equipment furnished by Leslie Co. on thiscontract.
Yours very tru
Charles E. Eric'ssonEastern Sales Manager
CEE: jan
'~y~ -~
Telex 136445 .Telephone (201) 887-9000
TVA 10581-!L' (EN PES-2-77) EUSTONN.~ 77ITEM MU.IUAwITITYINSTRUMENT NO.DRAWINGBEronrr
I I MFR DATA (IF APP)
I -- 1
I- -i-
6T MANUFACTURER & MODEL I ~~e7 [UNIT PRICE UNIT WT _ _ _ _
SERVICE _________ Lak w
CODE CLASSISEISMIC iCI I~ ,.IhbIT CIIA fiji 12 s -a ^ .0'
I-IiUIAt, I Vfl Iirirut .I h;~ r~vvr ' I I.
:11I LINE SIZE!SCHEDULE -- 2--. 12 MAX LINE PRESS. TPSIG)V_ i z7-- -_______
S13_ MAX aP IVLV CLOSED)o 4 MAX TEMP & RADIATION _______0,F___
__ 16 ANSI CLASS MMATEIAL>- 17 END CONNECTIONS -___
6 T8 BNNET TYPE-_N G .
.__ 20 LEAKOFF CONNECTIONS
22FLOW~ CHARACTERISTIC pti Fd6P~qt. POCCO-Or!23 MATERIAL 5s ___
2_4 NOF PRTS PRT SIZE5 __
GU IDING __ft&
SPECIL TRIM -A rz2112 - Sprc J4L R.l4*lfeENI.~~S )wf6S~saeE o-DeepA' ~ ______
2LSIZE &STROKE '01________
SUPPLY 70_-_/V_0-_____
13- FAILURE PSITION CLC IE
13 MANUFACTURER & MODEL "7T IYP ASS/ AUGES Yes __E__s
FOR INPUT OF0 ~ Our~u-SHALT, BE S ,~
1 36 FITER-RE TYPE35 ,~~e _
'ýQ37 LMT SWTCE y~s pero _Xni~38 L.S. CONTACT RTIR - s-4 0/ZovN'C..~39 SLENOIDV VAV yes A~iI&i~40 --.V. CTI-VVO]IKGE4 /5'y 0 _S41 r/p _ __________ 56 00•4f7A X
43 FLOWING MEDIUMTMX LWA KNFOo 44SI NG CONDITIN AT _MAX FLOW(fL I L) TMX L TMl1FCv
c.) 46FLOW-RATE ~i _/1___46PRESSURE PLSIA/ -
= 47 TEMPERATURE Fop /QICL. Pu L(PSI) tzz_ý 2
049 CV CALC(1
50..... Q CV ACTUAL) __________
X---DATA BY BIDDER NOTES: (1) USE FOR 80% TO 90% OF ACTUAL VALVE CV
*--OR EQUAL (z) &rm*raroc 07-Nem 7-'4AJ 9A)6U11"471C mf*Y
NA--NOT APPLICABLE sF sa8sya-a4trmr,.sieocy16MS--MFR STANDARD ,f,1NLF0i*~SEE' I
M-6: DATE:
M-5: DATE: SP ECIF I CAT ION NLi, wENGR:VCiv DATE: 3-/-0 CONTROL V LVESPLANT: AQ14m' &ie ET~~4 NOA Ar- SHE
II
REOU I S I T I ON NO 97377
m
830725T0 1llQA Review Required: Yes _.L No_
J. C. Stracener, Purchasing Agent, 7451 CUBS-C EEO[8 ý-'U ui i 90SF. W. Chandler, Chief, Electrical Engineering Support Branch, WBC126 C-K
July 8, 1983
WATTS BAR NUCLEAR PLANTVALVES AND CONTROLSCONTRACT 73C34-83577MASONEILAN INTERNATIONAL, INCORPORATED
CHANCE Of CONTRACT
Changes in design preasure and temperature requirements make it necessaryto revise the data sheets for item No&. 022 and 023 on the above contract.Attached are data sheets No. 22, Rev. 1 and No. 23, Rev. 2 documentingthese changes. In our judgment, these changes will have no effect on theequipment furnished. However, please verify with the vendor and issue acontract change accordingly for documentation purposes only.
No cost change is expected.
All other terms and conditions of the original contract, as amended, shallapply.
Reviewed by:_" 9 Approved
AMr~l AVDR.F'V Attachments~*/' cc: Accounts Payable Section, E9D88 C-K
R. 0. Barnett, W9D224 C-K*H. J. Green, 1750 CST2-CMEDS, W5B63 C-K
--J. C. Standifer, 204 GB-K**G. Wadewitz, Watts Bar CONST (3)
S: i'.-' P,F, w
by:Chief, ElectricalEngineering Support Branch
CV
Principally Prepared By: A. V. Vickery, Bxtension 4031
043181.11
*Blind note; No impact on seismic integrity coordinated by our A. V. Vickery andyour J. T. Huie on June 20, 1983.
**Blind note: (Ref. SW? 830408 046 dated 4/6/83).
(D
I ITEMNOM. 23 MFR DATA (IF AP.2 'OUANTITY8.3INSTRUMENT NO. icy- -lysi,,164, /V, 17/
.4 DORAWING
.5 REFERENCE 5PS-C /,643S6 MANUFACTURER & MODEL t'I X
*__7 UNIT.PRICE/tUNIT WT.8 SERVICE 141e 'x* 9 CODE CLArSSEIsI C10g A TION IN'UT SI GNAL 4wajIt.4 rr/,sop - ______-__w____I
L' INE SZ' EULE ,zo-12 MAX LINE 'PRESS. MG~i) /75"S13 MAX A~P (VLV CLBED)
' 14 M'AX TEMP & RADlIATION /O _________r 5 IZE/STYLE 6ýzood _x16 ANSI' CtASS/MA~TEIAL' 900 *~, ri~ 7EDCONNECTIONS rzKo
S18 BONNET TYPEx19 PACKING x7
.20 LEAKOFF CONNECTIONSv.21 1_____________ _____________
27FLOW CHAR~ACTERISTIC ms x* 23 MATERIAL a7,~.S 57pj0e x214 NO. OF PORTS!PORT SIZE/.2.5 GUIDING*.26 SPECIAL TRIM AlwpovAeo. Aoe x
27 SEAT LEAKAGE___ ______
.28 TYPES29 SIZE & STROKE ,S K
. 30 SUPPLY KDi P*3? FAILURE POSITION .0Ar~ )
#L U~ .3 2 MANU FACTURER & MODEL 804~,sq ,J*,Z K!C.33 SYP ASS!GAIJGE 10"s-. 314 FOR INPUT OF /40~. 5-d..-q K..
F 35 14 -P. -SHrALL BE 3 P35Z6 /s-psxt X.36FILTER-REG TYPE 4.7AC-35' dc-5vaC K
.37 LIMIT SWITCHES gacaiq.,.w epCo 38 L.S. CONTACT RATING P*,C. /. Z. 3 K'39 SOLENOID VALVE I3-4Y 60,*t. z/. z.&) x
14O0 S. V. CO IL VOL TAGE I 6,2i PCj141 YA.?r'AL C';ERRT:E
43 FLOYWING MEDIUM W4 77f tS414 SIZING CONDITIONS Al A'.' , A7 VIN ztc~Z FLOW RATE 55~" ~.
PRESSURE (PSiA) '#o4~ac 47 TEMPERATURE (F)/D 4
'49 CV (CALC) (1) K........... Q CV (ACTUAL) ____________ _________
X --- DATA BY BIDDER .' ~ .. 7:A.~---OR EQUAL ( .4L4.eNA--NOT APPLICABLE(z c SbiP 4.E
MS--MFR STANDARD 1&--~~. ,4,q v-7)
M-6: DATE:M-5: DATE: SE IAINN./V
ENRA&DATE: 3-31-83 SPEIFCAIONNO_11W
PLANT C 0N TR t L vL[VTS-
orr AAr T
Z-7e,
-A
FORM 310520DIN510610520.92.0000ref: 10520DIN3553
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F /3 3 /3/
Comments pertinent to finding:Document in design files the rationale for the acceptability of the auxiliaryfeedwater pump motors to exceed nameplate rating for event postulated in thefinding.
Memorandum to Files (EEB 830928 917) attached.
Program Team/Member
OEDC Program Manager
Charma, ODC olicy Committee
?Zt-ir -7j/ ?Dat E
Date
Black & Veatch -r-
Classification: Type____ ___ ___ ___ ___ ___ Category __ _ _ __ _ _ _
Date
'DateiBlack & Veatch Senior Review Team Chairman
4<
. ?-7/ .
-rv& ad tOI-0S4
5ý
UNITED STATLS GOVERNMENT
Memorandum-- Electrical .Engineering Files
TO
FROM
DATE
TENNESSEE VALLEY AUTHORITY~
EEB '830928 917
Barry M. .Fore, Electrical Engineer, w8Cl3l C-K
September 30, 1983
SUBJECT: WATTS BAR NUCLEAR PLANT
BLACK AND vEATCII PROJECT 10520 (B&V)
FINDINGS NUMBER 333
AUXILIARY FEEDWATER PUMP MOTORS
The purpose of this memorandum is to document TVA's response
to
and conclusions regarding B&V finding 333. Attached is a copy
of B&V finding 333 and TVA's finding response
and independent
review (Forms 1 and 2).
Barr Gr
%GFSJ-6 1111 At tachment
cc: F. W. Chandler, W8C126 C-K.
9/28/83 - FWC:JKN,-cc: C. A. Chandley, W7C126
C-
R. A. Costner, 14173 MIB-K, w/i
MEDS, W5B63 C-K, w/l
R. M4. Pierce, 104 ESTA-K
J. A. Raulston , W10C1 2 6 C-K, w/i
M4. N. Sprouse , WllA9 C-K
.3. C. Standifer, 204 GB-K, w/i
ii
FORM 3 10520DIN510710520.92.0000'ref: 10520DIN3932
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Numbher /F / 3 / 3 / 5
Comments pertinent to finding:
Comments on attached sheet.
Program Team Member
OEDC ?rogr-am Manager
Chairman, OEEEC Policy Co-itr eel
Black & Veatch
.Classification: 7ýrpe Category4
Date
DateSlack&-'eatchSeior Review Tea= Chairm-an
ate
Da te
Date
Zu- t& 4,U2.1ý C ý/ 77VW -rot-,, 3 C,,,, ý
vZq
FORM 3
WATTS BAR NUCLEAR PLANT
INDEPENDENT REVIEW
Finding Number F335 (Continued)
Comments Pertinent To Finding:
Corrective action for this deficiency was in progress prior to theBlack and Veatch audit. TVA is in the process of compiling a reportwhich will contain the qualification in question. This report will bein accordance with EN DES-EP 3.03 (Design Calculations).
This effort was brought about by NCR CEB 79-23 (copy of NCR and finalreport attached). All requalification documentation will be completedby fuel loading and will be tracked by CTR WBN-E164 Rl (attached).
The following issues were identified as the basis for designating thefinding as open.
1. "The position, ... that the valves are remote from thecontainment has no bearing on the accelerations since the pipingwill modify the dynamic input."
Isometric 47W427-218 shows the pipe routing and support scheme forthe problem in question (0600200-05-01). A copy of this drawingis attached. This isometric shows that the piping is attached tothe steel containment vessel (SCV) at only one point (node K(3).One point is attached to the steam generator (node 99). All theremaining supports are attached to the interior concrete structure(ICS). The SCV is the source of the acceleration in question(DBA-ZPA).
It is obvious from the isometric that the valves (nodes 64CG,65CG, and 108) are, in effect, rigidly attached to the ICS.Additionally, this area is isolated from the SCV by many supports,many feet of pipe, and several changes of direction. Therefore,the remoteness of the valves from the containment does have asignificant bearing on their accelerations.
2. ". . . some internal (valve) parts may not be (satisfactory) . . ..
TVA's statement made in our level 2 response, "Valve design issuch, . . . loads." is shown to be correct by a review of theattached analysis report. This is the analysis submitted by thevendor for the valve in question (6-inch Borg-Warner swing checkvalve).
2
DEO3 :013312.04
Z74
FORM 3
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number F335 (Continued)
Comments Pertinent To Finding:
Page 9 of the analysis gives a tabulation of calculated faultedcondition stress and allowable upset condition stress for theareas of the valve which were evaluated. Page 20 tabulatesseismic stress at the first three of these areas. A comparison ofthese shows that for these areas seismic stress is negligible.Page 9 also shows that the calculated stress for the next fourareas would not exceed the allowable stress if the seismicacceleration was increased tenfold. Seismic accelerations causesuch a negligible load on the disc that the vendor did not includeit in the evaluation in the attached report (TVA concurs with thisjudgment). Thus, it is shown that those areas with highestcalculated stress versus allowable stress ratio are largelyunaffected by seismic loads; and those areas with relatively lowstress are strong enough (due to standard design) that there isadequate margin to accept much higher acceleration levels.
DE03:013312.04
Z70'
Evaluation of the TVA Form 3 Comments
F335
The information submitted by TVA on Form 3, along with the informationcontained in Finding Report F335 and Document Review Record 554, have beenreviewed. The conclusions reached are as follows.
1. The discussion of the proximity of the valve to the containment isconsidered to be moot. The accelerations cited were calculated by a
verified computer program and are in situ values. As such, theirorigin is of no real consequence.
2. The partial copy of the Borg-Warper Report has been examined, and
the position taken by TVA is considered to be defendable based onthe tabulated stress summary. The basic body was considered accept-able based on TVA Form 2 response, and the remarks indicated a generalacceptance of that portion of the valve.
Examination of the Stress Summary for miscellaneous valve parts, as-
suming a nominal 10-pound deck assembly weight and the 11.5g accelera-tion, suggests that sufficient margin exists in the design of thearm, clevis, clevis bolt, pivot pin, and deck to accommodate the
higher "g" loading.
3. The re-analysis effort, which has been undertaken in response to the
NCR CEB 79-23 Report, will re-evaluate this piping. This effort isshown by the attached copy of the CTR to be in a documented trackingsystem.
Based on the above, this item is considered to be resolved.
-Z7-7
LJIV-41 OFbt V A I~.LNtVAUIN I f)I LI I ' C~L '79 0612 01201_I _ _ _ _ _ _ _ _ _ _ __1(.N E
NONCONFORMANCE REPORT 1ubV n 2a on T ,4J
"jtWattsa bar :IFLANT WattS Bar I~; n~~Z. Douglas W8AngIrTOX DATEu* 05 5 STiz
0 gall cntajinmmt vessel (SCY) oomater model analyses tolLavirg a design basis accident11A) indicate shell displacementn in~ and out at approxiuately 6 cycles per second. Piping
attached to containment was Analyzed for enveloye static displacements but not inertial.effects.
79061 4H0211 6DATE 0?OCCUIRENC8 M) ACT.( J~une 51M ac" REQUIRED YES 0 No 0METHOM Or DISCOVERY Desi Review SIOKIPICANT CoON ADVERSE TO QUAUTYUNID CODE (KNOES-EP 8.01) VMS ~no Q8C)IRDULZ WMACT F (3 A 0 N 0 ANONC CNIZT/DATEASSIGNABLE CAUSE - / I'lEnvelope MBA displacements were conisidered to be adequately conservative to account florinertial effects.'
CORRECTIVE ACTION.Piping systeme attached directly to containment vill be -reanalyzed for fLBA using time
ory displacement data from the containment compter models.
ACTION RELQUIXED TO PREVENT RSCUDRENOX:
~'COMPLETION VERMWI BY BRANCH CHIEPIOROANIIATIONIDATZWARKS:
3A GOMOIIP-NOUIEERINO SEC`TION XC _________________"5 0A CHIEF. QUALITY ENGINEERING BRANC-H
S. e ab"w NCR%) QED USE
U'NITED "ATU GOVZXwr 800214A0397 ~
Memorandum TENNIESME VALLE ALJTORrTY48-100O211 016;
TO 0. F. Dilworth, Chief *~AoUi fgine~rwp VOC2.2 6 CA
FROM R. C. Barnett, Chief, Civil ftg4ne.ij* ftanh, WA2& C-.[
DATE FEB 1119S3suBJEcT: um.~ sm 5M1LJ PLANT tUlT 1 AND 2 - IMA MWDD1I CF AT 1m CO1ZAI3W
NDT 3jOPMM! ACCWWEN FM IN X3SIM - ER CI 79-23 -FXLRPR
Attached is CDl's final report an the subjeact nonconformane.
R. 0. Barnett
j?9~ ROB :JBR~t:E1r) Attachmntcc (Attwcmnt):
Ray R. Dumham, W13A9 CAKJ. P. Knigbt, W3210-0r-
R. K. Pierce, 2D4i GB-K (2)
1'L&wy U.S. Smixts Box&s ReSW&vWy ox se Psyrofi Sassas pt..
4O
77q
WATTS BMR NUMXMA PLANITNCR Cfl 79-23
10 CER 50.55(a) REPORT 2 (MIAL)DaA NO~VDEY2T CF STEE CONTAINMENT
NOT PROPERLY ACCWNTE FOR IN DEIGN
Description at Deficiency
Piping which penetrates the steel containment (SMv) vith rigidpenetrations or is rigidly attached to SCV was analyzed and designedwithout adequate consideration for design basis accident (DBA) move-ments of SMV. Specifically, earlier analysis and design of pipingsystems penetrating the steel vessel incorrectly accounted for thefol~lowing:
(1) Most piping systems which penetrate the steel vessel aresupported by rigid pipe supports, springs, and/or bymechanical seismic supports (snubbera). .However, thecontainment and piping response to earthquake and IIBA motion israpid enough to cause the snubbers to lock up thereby preventingmovement of the pipes.
(2) The displacement of the vessel wall and attached piping (at thepoint of attachment) was incorrectly assumed to be only outwardfor the analysis and design of certain piping systems wheremovement of the vessel wall was considered. However, inwardmovement of the containmnt vessel must also be considered where
vessel wall movement is important.
(3) In the original analysis of Sequoyah and Watts Bar pipingsystems, TVA's analysis approach was to conservatively analyzefor containment vibratory motion during a 1BA inside containmntusing static displacements. This analysis was consistent withthe anilysis approach and riiilosophy which was used at that timefor free standing steel containmnt buildings and was judged tobe adequate to encompass inertial effects. It has recently beendetermined that acceleration effects due to the rapid vibratorymovement of the containment vessel may not be adequately consideredby the static analysis.
The attached table lists the piping systems by penetrations which arebeing corrected for this nonconformance. All Piping systems listed arebeing reanalyzed to account for the inertial effects.* This reanalysiswill envelope any corrective action for the displacement problem.
-z oo
Safety LrliCRatlOna Statement
Had this condition, gone uncorrected, certain piping systems would havebeen overstressed during a flEA and could, as a consequence, result in abroach in containment integrity. This could have adversely affectedthe safe operation of the plant.
Corrective Action
TVA ban generated time history and response spectra data at eachcontairnment nozzle location for each of the six primary system DBA's.Using this information, all piping systems having rigid penetrationsthrough the WIV are being reanalyzed giving full1 consideration forthe flEA event. Also, the new flBA movements are being examined withrespect to bellows type penetrations by both TVA and the bellowspenetration vendor. NIo problems are anticipated with thesepenetrations.
The analysis effort-is still in progress for Unit 1 and 2. Wherenecessary, supports for piping systems are- being relocated or redesigned.Flexible hoses are being installed to isolate the SCV movement fromsmall diameter piping. All analysis,-design-, and construction will becompleted by 1% power.
M - - M - - ý
WATTS BAR NUCLEA PLANT
Piping Penetrations Affected by NCR CEB 79-23
Penetration Analysis ANumbeor FXHome FH)
16293539A
40A140Bi.0D1411.2143A143B143C143D414148A148B49A
149B
50A
52535657
59
AAA
FRI
AAAFlIAAAAAAAAAAAAAAAAAA
System*
CVCS' (Discn)CCS (Disan)WDSWDSANW (Supply)ANW (SupplylCSAB (Supply)WDSPNSCVCS (supply)CVCS (Spply)CVCS (supply)CYC8 (Supply)CVCS (Discb)Containment SprayContainment SprayERR SprayERR SprayCC$ (Discb)ccS (Supply)CO (Supply)CCS (supply)ERCW (Supply)ERCW (Diach)EROW (Supp!X)ERCI! (Diech)
Pipe size
366
.7514143332222'4
12128833666666
Service
Normal charging to Regen HXR. C. Pusnp Oil CoolerExcess Letdown ICC112 to AccumulatorsaN12 to Pressure Relief TpnkAuxiliary FeedvaterAuxiliary FeedwaterAir supply for H2 PargeFloor Sump Pump DischargePressurizer Relief ?umnk MakeupSealwater Injection - RC Pump.Sealwater Injection - RC PUmpSealwater Injection - RC PumpSealvater Injection - RC PumpSealwater Return - RC PUMPSpray HeaderSpray HeaderSpray HeaderSpray HeaderRC Pump Thermal BarrierRC Pump Thermal BarrierRCP, CRDt4, Lover Cant Vent CoolerExcess Letdown IlKRCP, CRD14, Lower Cont Vent CoolerRCP, cRDH, Lower Cant Vent CoolerRCP, CRD*4, Lower Cont Vent CoolerRCP, CRDK, Lover Cant Vent Cooler
Sys Reqd forSafe.- Sbutdomf
I
WATTS BAR NUCLEAR PLANIT
Pip~in Penetrations Affected by NOC CEB 79:-23
PenetrationNumber
Analysis (A)Fix Hose (FH) Syetem*
ERCW (Supply)ERCW (Diach)ERCW (Supply)ERCW (Diach)ACSACSFPSEMEMACSACSERCW (Supply)ERCW (SupplyERCW (Discb)ERCW (Diach)ERCW (Diach)ERCW (Disch)ERCW (Supply)ERCW (Supply)CSASLWSFPSFuel Pool CoolingFuel Pool CoolingUhI (supply)ICs'Cs
Pipe Size
666622
1.1.52.22222222222
'46'42
.22
1212
Service
RCP, CRDM, Lower Cont Vent CoolerRCP, CRDM, Lower Cont Vent CoolerRCP, CRUM4, Lower Cont Vent CoolerRCP, CRDM, Lower Cont Vent CoolerInstrument Room Vent CoolerInstrument Room Vent CoolerRCP, Fire ProtectionContainment Atmosfphere MonitorContainment Atmosphere MonitorInstrument Room Vent CoolerInstrument Room Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Con~i-inment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent Cooler5er-vice AirDemineralized WaterService to RCP Spray CoverageFrom Refueling CavityTo Refueling CavityTHIl Valve Test LineGlycol Floor CoolingFlycol Floor CoolingSCV Hydrogen RemovalSCY Hydrogen Removal
Sys Reqd forSafe Shutdown
WATTS BAR mXLEA pLAIIT
Piping Penetrations Affected by NCR CEB 79-23
"For description of acronyrms, see next page.
*rthe CSPiping between the excess letdown heat exchanger and the steel containment vessel in TV'A Class B and isrequired to function as a containment boundry (i.e., a closed system). It is for this reason that It isIndicated as required for safe shutdown. The function of supplying and discharging CCS water to and from theheat exchanger is not required for safe shutdown.
**ISystem does not penetrate SCV but is attached to the BCV.
WATTSI BAR NUCLEAR PLANT
Piping Penetrations Affected by NCR CEB 79-23
Acronyms System
CVCS Chemical Volume and Control SystemCCS Comiponent Cooling5 SystemWDS Waste Disfposal SystemAYM Auxiliary Feeduater SystemFWS Primary Water SystemICS Ice Condenser SystemFPS Fire Protection SystemEDCW Essential Raw Cooling SystemDWB Deminieralized W49t'r SystemUHI U)pper Head Injection SystemACS Air-Conditioning/Chifled Water SystemEM Rad1iation MonitoringHC Hydrogen Collector
TvAl1018(EN DES- 9-83)
/ Lj/_-S 1-/LI- LCtC/
COMMITMENT TRACKING RECORD-
3 DATEFILED
// 7 / 3;
4 APPLICABLE TO(PLANT/UNITS)
LAoti rl 1 1f
5 IDENTIFICATIONNUMBER
v%/e.) - 6, /./ e/
6 COMMITMENT TITLE _______________________________________
7 SAR TECHNICAL 8 NLS 9 COMMITMENTRESPONSIBILITY RESPONSIBILITY LOCATION
'j...~ P~~Alui 2jjscezr anj
10 TRANSMITTAL RECORD [FROM -TO - DATE (MEDS ACCESSION NO.)] - FOR NLS USE ONLY
11 EXPLANATION (INCLUDE A SHORT TITLE FOR EACH ACTION FOR TROI SYSTEM INPUT) -THE FOLLOWINGCOMMITMENT(S) TO NRC WERE MADE IN THE DOCUMENT/MEETING NOTED ABOVE IN BLOCK 9, 'COMMITMENTLOCATION":
A~r.*r ~ ~v,-qjAleJ- g 7),*oVI5 ~AM ý,Ji rjr ,ir ,jer~e
F l~r ZZL2. rf 2 ZW,,eAde4 !V-' AA, /--&oqAZCPN fI- A)MA i
AAn.riz A4 - C4) BY 0rr /e-
12RESOLUTION (FILL OUT ONLY AT CLOSURE) __________________________
DOCUENT OR SYSTEM~ TRACKING DATEOR CLOSING COMMITMENT: [DOC/SYS: ENTERED:
(STATUS AND INSTRUCTIONS - OVER)
RESPONSIBLE 2 DUEORGANIZATION(S) DATE(S)
CTION (ORG - GROUP - SUPV)
(2) WaP (l orkc vI3~'i,
(4)I I
I
Auclear Valve Division -_ Ene,
lBorg-Warner Corporation7_500 Ty. one Ave., Van Nuys, California 9409 .* . . - .
- SESMIC ANLSI I76 INdH, 900 12B
CARBON.STEELSWING CHECK --
GATE VALVEii*1
- - .- ---- ~. FOR- ~.. YENNEMEE VAL=E AUTHORITY
- ýATTS _BAR NUCLEAR PLA1~T
gyen REPORT NO. NSR 1455KAB*1-1.p ntPAGE
DATE 11.JAN 78
IAPPROVEDIThis approvoL. ow rat rogse turn owacor frowni any port-of Wis renawWW"s~
,vthe corecness~ of dai!ý.n, aWish W~dimoriom.
-ENNESSEE VAL.LEY ALMH)ORflY
AECPI V-1G SM) BY: L. R. PAMTRft5
.ns'd By Urv Smh 3
TVA FE 8 2~'pr,03ECT: WATTrs B~AR
CONTRACT No:T 7'.4-t~ qJ4
USEFL"9 _-S-BY
N~UCLEA VALVE DIVISIOTBOG -WARNER CORPORATION
7500 `]yrone Avenue~VnNuys, Califor'nia 914109 rll
t:
ý71
Nucleir Valve Division,Borg-Warner Corporation
S7500 Tyrone Ave., Van Nuys, California 91409
SECTION
2.
3.
3.4
3.1;.-
3*1.2
3. :1,3
3.2
3,204
3.2.2
3.2.3
I.4
J4..1
5.
Energyt RERT NO# NSD 14555KAB1-1PAGE- 3
TABLE OF~ CONTENTS
DESCRIPION
INTRODUCTION
SUMMARY.
VALVE ASSR.MBLY
Valve Body
l~ading
ýCross Sectional Proper-ties
ýSbresses
Arm end ~isk Assembly
Loading,
Cros~s Sectional Pr'operties
'Sbr~esses:
.NA.TURAI; WEJCIM OF VALVE A~
'Valve B13ody
CONCLUION
LU
3SSEMBLY
PAGE
7
9
10
-13
13
.18
18
31
31
32
32
39
39
42
'Nuclear Valve DivisionBorg-Warner Corporalion7500 Tyrone Ave., Van Nuys, California 91409
L(AG,'0r_ nergVJAI~E - gy REPORT NO,. NSR 45KAB-1-1
Ppt AGE 4
NOMIENCLATUE
b
d
E
I-
J
M
M
area -,U.,2
age(degree)
angle .(degreeT'
=pul~l -- (kip)...
d diamet er.:*of. -a circle (in)
defleebiom (1O in)
modulus:.of elasticity (ksi)
=nat uralfeq ny (Hz)
=accelerabidon (in/sec2 )
polaren mf-,_IertL ofinera in
- owenb Momenb o ieriap)
-mawz Ab)u
-weighii U1b)
reipoc1 fPoi-zson' s raet. o
.3044159265 _ra~io of circizferece '-o diarne'er of a ircle
ýreacbion .force (id.p)
=rad'u of' circle (in),
shear. force (kip)
Nuclear Valve-Division,Borg-Warner Corporation
500Tyrone Ave., Van Nuys, California 91409-
3 stress (ksi)
SLY. 3 eismic. load. fact or'
-SUM summnation.
T- = torque (ft l'b-,-:or in-kip)
vmode shape,.
w natural. frequency (rad-Lan
x,y,z =space coordinates, in car-t
x disbance (in),
y =disbance (in)
ZI section .modullm (in)
T ~ T lexibi-lity :"matrix
~Tv] unrit matrik.
mass. matrix:
'Iv] --mode -shape-
AEnErgWRER
__Equipmen REPORjT NO~. NSER 4;55KJAB1-1PAGE5
per sec.)
esian systemn
* superscri Pt
a axial
iInside, inte6rna~l
T. ow ind ex. of mattrix
columnn ind ex of mab
- *-* -C-,'
I
ýýuclear Valve Division
7;^': T-Yzrrc -c Var. Nuys, California 91409
max maximal value
p ý-'piping
= t an g eniia1-
.1,2,3 = 3ectonal.;'ýo cndibions
~ii~ ~ 7 ~REnergy.....SYX 4-Equipment EK~ u SR~~A~1
.?)A GE 6
- ~-7
Z?0_
z9/ -
PNucle'arWVave'DivisionBoJ_-g-Warrier 'COfpOraton
@730 Tyrone Ave..-V-an Nuys, Calitornia:91 409
2.S M MR7..
_ 1 Energy RPR O S i5A~-E~ie~PACE 9
ASSEMBLY .DRAWING. NO.ý 455KAB,1ý1.'
DESCRIPTON O1F.. MTERDI-. 2 ALOAL .CLULTD
UP-SET MOIDE: FAULTED MODEVALV SCIN .SPECF2CATION .KI > .(K'
BD,M M-RU SA35OL*GR.U1'24.,30 .54
BODY1,4ECK S SA350 GR.LF1 24{.30 10.29 0906 .2-1 9
BODYBONN.,J. .1A35 ~R~I212~4,30
ARM,~ : i35598,170
BOLT,,CLEVIS-ý. ,A2.16'iGRWCB -32.~4o
PIN, pvcrr A564~ TY 630
DISK SA105
403.50
29.*10
0.
8.21
14 .~2'
2.04I
.RE~JrMED CALMIATED-w
-VALE SETI.ON ICY;:EC fc yc IzS: c
VALVE BODYh1.3.0 5396A
VALLVE OY OS*3 .GG - 2fi28.87.
*~4
'.aa0'.
A.
Z,.
.v,. ,
S - t:-rValve DIVI31n- -
- Borg-Wa mar Cowrpoazon- 7500 Tyrone Ave.. Van Nuys. Cal loria 91409
~4't•:r~;Ene rgy~ .asoeinEquipment REPORT NO. NSR4SSK
PA=-
VALVE ASSEMBLY:
.. . .... I
-, C~~.~ A
uir of Mass-.
____ Eont .
-------------
7 7
-A-7-
1777cj -r''77
A-~.A. 4-.~J4-.. . .-.-. '
- FJIGWRE 4 ALVE ASSEMBLY-
-4no
X. 4,.
M9Z~
Nluclear Valve DivisionBorg-W'arner Corpo rption-7500 Tyrone Ave., Van fquys. Cafifornia 91409
-E n Eerg YItARNER
PAGEN~X
20
VkLVJE ASSE2-SILY:
TABLE -3-4 ,-1
TA-BLE -3-4.2
SEISýMIC-SThESSES kT- 'PrTAN ..
4~55t(AB1-.
SEISMIC STRE-zSSSK M. P LIE'E- -2:-2
34,3)
SEISMIC STFz'z-.--AT- .7 NS,-.
Z-~- V- '4z ~ - --, 7 "E
j' ý7 :7.4----
.4 ~ R
'77~.
.i. -. ~.--.-,".,
C -7. ý'-
Nuctlear Valve Division E,
7EOG Tymone Ave., Van Nluys, Caiiferma 91409
3. VALVE ASSR-SLY.
S4/A0 + Mh/f e A /21
and
The'ntrerical 'val~ues are tsabulated T. Tale 3-8@1.
3W2.3.3 'rlei-net'Co'nnsctin ...
The. clevlz. ~o, bne oncinwl eProvided byprimarily bhe fille6 welds. arot-jd'., -the clevis periph er y
. . .. . ... . . . . .. . ....
Irea~d~2(f 2d)) -1/12
ý ~effee wive-throat j
7-
0 7ýkf at
7
Thu-3 -
Fli/A + M3235' Xi. w /2 /I
fn' ITr'ie l~o~ ~zo ~ ~ ~ n ~T:ws-Y s-
Nuclear Valve Division Energy ro.tr~Wi~Co~poraion PG
75 y nre Ave., Va. u~ys, C~ailcrnia 91409
3. WILVE ASSý-r¶BLY:
eITumtI4ons* The ~a x~lzn'. moa~emt occl..&s a.-t~ he cerxant - of. tbed~isk: -(See. Figune .- )
k~ 2
where
q P -3andard calculate~i (oI- desiLgn) pessmze
IT irrosherkot "Theoy :of ae &es" i be72
mnus,.-Ihe :correzpoandirig ze.-sses are!*:Iý
Al-b .i~nat v ely onierin q t2reat 6h zenter, thefolJbowing'. forxmul~as :a:,be usd
-2-'
-4 -b I.t 1~ C,...
lc~msa_ý o th e.-. p. eLmv
(RJI!_P~~i- Roar K.. 2 :13L
At 1-E-x'. -w-r
Nuclear Valve DivisionBoa-a Ala.-er Co~.rpoa!oni E0Tj0c Avc-., Van Nuvs. Calhio~rna 91409
- ARREnergy,Equipment .REPOR~ I .N, ~ 45Ab
VAL'v7E kSSErMBLY:
TAB-PLE 3-9 . STRESS-DI-SK
Lý&AE1
q (k.43i)
h:,) 725150
3 5 80
K2
(in7-kip:,
(khi)
.)2 (k )
b
. e ......
D029
*~3-,33
279~
2773
5941
K~~ 62",O
A 86
S I I9I3-Lat~MtfrI V"I galI
I 2 I 3 I 4 5I 6I7 ISI9 I10 iPROGRMM DETEAWAOJILBY T/A REmsRT #D. CEN -RI-jo. aimimz I
PIP/NG ANALYISIS AMODEL I13 CURRENVT To REYISIOT 0 ' - -I - - -___________OF 5THIS OWNPIPINA CHAINGE3OO WWHI~~ON VANY .- , .C * ~ 1 ~x___se~~S 4Se
LATERR E VIS//SVOF THIS OWII. RAVE NrIOTREAL//RED r.EOA0IL.1'EZ4HA.9I I.E . somI -1 PX~nI A
A REANALY31S SLIT WILL BA INCORPORATED INTO ltIi i ~IIRE A,*4OB«8'$05S7"OLiN-NEXT REANALY3I5 OF IRIS FR!ILEA1. IAPERT~URE &-*P 1C ,. . A. O*4RRHIAAO
P''.AA S NUM' O02SD-AI HAs"BE- /Y SFOB /I fE' F~ %I -
TEDRAWNB G. 4IWHS7-ZI/AR Iis FVALyIDORI/WIT N ANEW DRAWIN& NIIMSER #1427WA 224zANDPRODOLEM
uNT/L 47W#27-ZZ#RO 1 ISVl/IED. 1~ I\( )E *.___ __
=01" If DEAIL.A IVA
. I'~ MI T- YSBS YS
ASAB
Js& ItC" n. ceI..3-SATAL8 ETI C DTAL ETILEX Y EAII
BuR I. CI'A --------
SY1lo I t vi 0 E 3r o *SOL Cis mftw
104 II4.'16DETAIL G DTIal*. C4's A. 14 A I S
16I ---
IDSA? Ita n A W A&..-TO IIJPA
"A as NAONG 6EOOENS-4
1ARALYING'UIts
A47AW aft. lip" as PS. zt& B INS
I-SA43 -0A-40- IAAllS44/A
f77 1 Z- 65 0 L15i 08 *s1to
O~e). ~ *~ /(jQ/9~' jAt 9/ r\ ~ REATOR CAMEINae. '5 PROBLaM ROME0 ANA
84 7 :3.e 11111 416ol43T T"1445P1.At 31 ATIPR mmkfia Us73 S ý* ItI111ICAMANDPS PW DCLIWATTSmr 1 B1 ARN
Aot) tATAw.karATMDALTPT. At'. a
mB) 291AS IL NG ETAL T ONE 1 M* G
'BIG -234 27
1 12
(03! u-w- l
Mou a £alp #
"Imm, aIwxTNaw
I d tig) asw 1. o
-18)-- I ma ,4 st~m
- fl -AM~l~f 51M
COL"ALNATN
Ma"
ASa a I mlCU ll
slslAURA ll/LC Fsto'S/SC .. .
rINDAS All Sr.AmlEsI.
IICOAL ;,Ts eAi"ANDIAIe8 1454PNSt TTAP9 l/5./LA7-014.
%GqVA5f ALL 2ZV 6M AR6.A 8Ib1'AHNfL*i)LSOWOB.STUEILMNI LINES~,HVh1IS ANOL On C/NA OSA ANO C17A ARCIO PER DB..AWlNG SEQiGS 476001fel?)IT, A WLMI/NO M.A5 00
5A REANAL'A150F WM PROBLEM0AN1PA14 F TV45OFISOPACO&OOO-01f
O0CUMINTAT/Om LOMWIBMEII79-9
ASSEEM CONIOINEDU)T 0MOTIALYBIS. ALA. CALCUALATIONS ANCTO 064H.tr.9 4101401-246..
46 ikls
/OINS N AVE .DCAL CO004.*Arm04 N 5DETAIL Z, EXCfOT AN
RA s t . f wv 40 cc
',A CLASS 6lIAs. QUPTU(LOC5 Ua~/ATCO AT 3T. 01. ZT
qMAINTAINED To ALLOW FARTWIGc P10124 MOVEMENTS.ruitt oLMIvEMLmT /cmilEs'l
M5 TIAN 1.0*All Or ASWaaI NOT INCILUDED, SEE UGI-SIL
.-- zl
0" FVI. X-409DuAL B DtMmIc AN~m.~
OJLZAR PLANTY1~B'
Also Avaflable O1nAperture Card 8402 160294 -)(,o
FbT).,
-=f
Týis Mae" *-^k-SM
F wIr
FORM, 3 10 520DIN5 10810520.92.0000ref: 10520DIN3933
WATTS BAR NUCLZAR PLANTINDEPENDENT REVIEW
Finding Number /F /3 /3 /6I
Coments pertinent to finding:
A compilation of valve requalifications was in process before Black &Veatch identified the finding. A report containing these requalificationswill be issued in accordance with EN DES-EP 3.03 (Design Calculatiolts).Documentation will also be placed in the procurement files for each valvewhich will reference the major report. The major report will contain thecriteria used in concluding that the valve is qualified for the new higherloads.
This requalification was brought about by NCR CEB 79-23 (copy of NCR andfinal report are attached). All requalification documentation will becompleted by fuel loading and will be tracked by CTR WBN-E164 Ri (attached).
TVA References (ECN, NCR, CTR, etc.): NCR GEB 79-23 (CEB 790612 012)Final Report (CEB 800211 016)
Team emberate
OEC ror mMaager Date
Chairman, 01,C Polic Committee- Date
Mr XAc C ZB lack & Veatch ~ ~ ~ I
Classification: Type
ac &Vetc Pjct Ma2F~nager
Black & Veatch Senior Review Team Chairman
Category
A 4
Date
Date
WIIAU.JCAI)F ~LANCEtLI REPORT CE 061 2 012~I Wktts bar- IMPLA Watts Bar = U n
Itt 1AC.NJMoANIZTIO MyATEr *U Tun . 197V bI?&ON OF CONUWTION
0e1 conltainisent vessel (acV) coo~qter model analyses following a design basis accidentRA) indicate shell displarnesnts in and out at aworxinately 6 cycles W second. Piping
attached to containment vat analyzed for envelop@ static displacements but not inertialeffects.
79061 4H021 1DATE Dr OCCtMRBNC EMUt(I ACT.( )June 5, meN RWitzuna ES 0 wo 0
ASSIGNABLE CAUSE: LIVýkrvelope DBA displacements were, coxisidered to be adequ~ately conservative to account fo-Anertial effects.*
CORRECTIVE ACTION:Pip~ingsystems attached directly to containment will be reanalyzed
soydisplacement data from the containment com~puter models.
'4
for MBA us.ing time
ACTION RZQUIXED TO FP3.XVNT RECURRENCE:
COMpLETIOW TVrnED BY 3aAHCIE CMKIKVRGAWIATION/DAT
~ A oaotw-g~eougzarwo 530110K CR CLOSED: _______________
A GO4IO ZRN8 ONCHIKA'.QUALITY ENGINEERING BRANCH WA-TRIda" (Ote MWAfte NCX% QED3 USE
TWA 10* O3X 0844*)
41. ~ .-- - --.
Z9ge
M M M M M ýý
~L'NITKD IT~
TO
FROM
DATE
SL'BJEc'r:
A=AOOVIW~ff800214A0397 ~
, randurn TENNESSE VALLE AUTHONiTY
UB '800211 016;G. F. Dilworth, Chief Nuclear Ing1.new, WIOM-26 C-K
R. C. Bmmett, Chief, Civil hsgintering brach, W9=4 C-K
FEB 11 w8WAMS MR X==U PLAN tUTMI'1 AND 2 - MEA UNDEM or' S= COUTAINWZ
NOT FROPEY ACCWIZD FM IN DESIG - NCR CDM 79-23 - FINAL REP~
Attecbed is CEB' final repwt an the subjeoct n==onnfmawo.
R. 0. Barnett
j?9~ ROB:JRR:EIMAttaebmet9 cc (Attacbmut):
Roy R. Duhahm, W~lA9 C-KJ. P. Knight, W122330 -
-R. K. Pierc, 2D GB-K (2)
&uY US. Sawsags Beank ReuWdy on the pay". SOVWug P~im -I-
* ~3M
WATTS BAR NUMLZAP RANTMMICEBC 79-23
10 CER 50.55(a) FXPCRT 2 (FINAL)DBA J.NVDENTS -O STEEL C~fITAflO1T
NOT FROMMY ACCW1ITE FC IN DESIGN
DescriptAion of DeficieMc
Piping which penetrates the steel containment (SCV) with rigidpenetrations or is rigidly attached to SCY was analyzed and designedwithout adequate consideration for design basis accident (DEA) move-ments of SCV. Specifically, earlier analysis and design of pipingsystems penetrating the steel vessel incorrectly accounted for thefollowing:
(1) Most piping systems which penetrate the steel vessel aresupported by rigid pipe supports, springs, and/or bymechanical seismic supports (snubbers). .However, thecontainment and piping response to earthquake and IIBA motion israpid enough to cause the snuabbers to lock up thereby preventingmovement of the pipes.
(2) The displacement of the vessel wafll and attached piping (at thepoint of attacmnt) was incorrectly assumed to be only outwardfor the analysis and design of certain piping systems wheremovement of the vessel wail was considered. However, inwardmovement of the containment vessel must also be considered wherevessel wail movement is important.
(3) In teoriginal analysis of Sequoyah and Watts Bar pipingsystems, TVA's analysis approach was to conservatively analyzefor containment vibratory motion during a DBA inside containmntusing static displacements. This analysis was consistent withthe an~lysis approach and philosophy which was used at that timefor free standing steel containment buildings and was judged tobe adequate to encompass inertial effects. It has recently beendetermined that acceleration effects due to the rapid vibratorymovement of the containmnt vessel may not be adequately consideredby the static analysis.
The attached table lists the piping systems by penetrations which arebeing corrected for this nonconformance. All Piping systems listed arebeing reanalyzed to account for the inertial effects. This reanalysiswill envelope sam corrective action for the displacement problem.
/e
Salfety Iinlications Statement
Had this condition gone uncorrected, certain piping systems would havebeen overatrezaed during a flEA and could, as a consequence, result in abreach in containment integrity. This could have adversely affectedthe safe operation of the plant.
Corrective Action
TVA has generated time history and response spectra data at eachcontainment nozzle location for each of the six primary system DBA' g*Using this information, all piping systems having rigid penetrationsthrough the SCY are being reanalyzed giving full consideration forthe MlA event. Also, the nov flEA movements are being examined withrespect to bellows type penetrations by both TVA and the bellowspenetration vendor. No problems are anticipated with thesepene2trationls.
The analysis effort is still in progress for Unit 1 and 2. Wherenecessary, supports for piping systems are being relocated or redesigned.Flexible hoses are being installed to isolate the SCV movement fromsmall dianeter piping. All analysis, -design, and construction will beconpleted by 1% power.
WATTS BAR MJCLEAR PLANT
Piping Penetrations Affected by NMR CEB 72-2-3
Penetration AnalysistANumb"r Fix H : 1!1U
1L6293539A39B'40A'40D40ODI41'42143A143B143C143D41448A
149A4#9B50A5OB5253
575859
AAA
PH
AAAPHAAAAAAAAAAAAAAAAAA
Bystem*
CVCS' (SDuppl)CCS (Disen)CCS(Ds)WDSAN (SppyANW (Supply)
CSAS (Supply)WDSNWSCVCS (supply)CVCS (Supply)CVCS (Supply)CVCS (,Supply)CVCS (Disch)Containment Spraycontainment SprayMMR SprayMMR SprayCCS (Diach)CCS (supply)CCS (Supply)CCS (Supply)ERCW (Supply)ERcw (Disch)EHtCW (Supply)ERCW (Disch)
Pipe size
3661
.75I.'43332222'4
12128833666666
Service
Nqormal charging to Regan EXB. c. pump oil CoolerExcess Letdown HXN2 to AccumulatorsN12 to Pressure Relief TpnkAuxiliary FeedwaterAuxiliary FeedwaterAir supply for H12 PurgeFloor Sump Pump DischargePressurizer Relief Tnnk MakeupSealwater Injection - PC PuMPS~ealwater Injection - PC PumpSealuater Injection - PC PumpSesiwater Injection - PC PuMPSealwater Return - PC PumpSpray HeaderSpray HeaderSpray HeaderSpray HeaderBC Pump Thermal BarrierPC Pump Thermal BarrierRCP, CR114, Lower Coat Vent CoolerExcess Letdown EIIRCP, CR114, Lower Cont, Vent CoolerRCP, CR114, Lower Cont Vent CoolerRCP, CRDM, Lover Coat Vent CoolerRCP, CP.D1, Lower Coant Vent Cooler
Sys Reqd forSafe. Shutdovn
1**
XK
\ K'KKX
X*-*
w 4W
IWATTS BAR N1CLEAR PLANIT
Piping Penetrations Affected by NCR CEB 79-23
PenetrationNumber
6061626364.
319495666768697071
*727374.757677788283
110114115
Analysis (A)Fix Hose(FH) &Myatm *ý
ERCW (Supply).ERCW (Discb)ERCW (Supply)ERCW (Disch)ACSACSFPSRMRMACSACSERCW (Supply)ERCW (SupplyERCW (Di ch)ERCW (Diach)ERCW (Diech)ERCW (Diach)ERCW ~Supplyý
CSASDWSFPSFuel Pool CoolingFuel Pool Cooling-iii (supply)'CSICSHCHC
Pipe Site
666622'41.51.5222222222222'46'4222
1212
ServiceOys Reqd forSafe Shutdown
RCP, CRDt4, Lower Cant Vent CoolerRCP, CRDM, Lower Cont Vent CoolerRCP, CRDM1, Lower Cant Vent CoolerRCP, CRDM, Lower Cant Vent CoolerInstrument Room Vent CoolerInstrument Boom Vent CoolerRCP, Fire ProtectionContainment Atmosphere MonitorContainment Atmosphiere MonitorInstrument Room Vent CoolerInstrument Boom Vent CoolerUipper Containment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Containmient Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerUpper Containment Vent CoolerService AirDemineralized WaterService to BCP Spray CoverageFrom Refueling CavityTo Refueling CavityUHI Valve Test LineGlycol Floor CoolingFlycol Floor CoolingSCV Hydrogen RemovalSCV Hydrogen Removal
i
NOW
WATTS BAR NUCKLE.AR RLANT
Piping Penetrations Affected by NCR CEB 79-23
*For description of acronyms, see next page.
"The OCS piping between the excess letdown beat exchanger and the steel containment vessel to IVA Class B an isrequired to function aa a containment boundry (i.e., a closed system). It to for thin reason that It ioindicated as required for safe shutdown. The function of supplying and discharging CCS water to and from thebeat exchanger is not required for safe shutdown.
***System does not penetrate SCY but is attached to the SCV.
WATTS BAR NUCLEAR PLANIT
Piping Penetrations Affected by NCR CEB 79-23
Acronyms system
CVCS Chemical Volume and Control Systemcc$ Comnponent Cooling System
WDS Waste Disposal SystemAFTq Auxiliary Feedwater SystemNBI Primary Water SystemICS Ice Condenser SystemEFPS Fire Protection SystemERCW Essential Raw Cooling SystemEMS Deminieralized Wi~te~r SystemUHI Upper Head Injection SystemACS Air-Conditioning/Chilled Water SystemRH Radiation MonitoringHC Hydrogen Collector
TVA 10618 (EN DES -9-83)
/)L.S 1:LI: ccj~COMMITMENT TRACKING RECORD
3 DATEFILED
// I7 / Y
4 APPLICABLE TO(PLANT/UNITS)
A a J r I 4.2
6 COMMITMENT TITLE
7 SAR TECHNICAL 8NLS 9 COMMITMENT
RESPONSIBILITY RESPONSIBILITY LOCATION
10 TRANSMITTAL RECORD [FROM -TO - DATE (MEDS ACCESSION NO.)] - FOR NLS USE ONLY
11 EXPLANATION (INCLUDE A SHORT TITLE FOR EACH ACTION FOR TROI SYSTEM INPUT) -THE FOLLOWINGCOMMITMENT(S) TO NRC WERE MADE IN THE DOCUMENT/MEETING NOTED ABOVE IN BLOCK 9, "COMMITMENTLOCATION":
AIm &fd £ i ' & ,, ry 12V r W.r g/ OZP5 A,,, 2 g Qf AAd~)4 AA VA';
Aa oezopjeE-41 9v 7k'Js opobEfý rAr/S 0 ,.5,Arz)1/rriM .JLrt'AI7'
,!2 Q 'zDez J31 /k/if 710,,.tFi 0CS14A) AA' 5)te (10TA
,4). wogr~~ Ane -2ra O, A" A)r '2es- BY9 Zzr -?;lgolU) 4AAA) rv oj&XCr,? S Pjgit)f ,oJýR RhO 5I* /ý-7 c Vp
u)vsr~qt e7t-x/id-jr Ace zet lp/s' A,ýoe Llmir .2 dv. 0,cc, sq z4?J'-
(11A I r ilt (,AA),-F'; daivoA FeCA) ..210i VALAC RrEr) go',/o-o
I12 RESOLUTION (FILL OUT ONLY AT CLOSURE)
DOCUMENT OR SYSTEMA TRACKINGOR CLOSING COMMITMENT: (DOC/SYS:
DATEENTERED: I I
(STATUS AND INSTRUCTIONS -OVER)
1 RESPONSIBLE 2 DUEORGANIZATION(S) DATE(S)
ACTION (ORG - GROUP.- SUPV)
(1) 2z, 0J.LL 31/I'(2) WdPI. Is /o~~
(4)I I
306
NUMBE R
FORMi 3
307
10520DIN508510520.92.0000ref: 10520DIN3935
WATTS BAR NUCLEAR PLAN'TINDEPENDENT REVIEW4
Finding Number I F / 3 / 4 / 0
Co~ents pertinent to finding:
TVA' s unit 1 corrective action is complete. TVA committed to revisingN3-3-7A calculation package to include the evaluation for the relocationof a support. N3-3-7A has been combined with another analysis and tsnow N3-3-5A. 47W427-221 RO, issued February 24, 1983, shows thecombined problems. The unit 2 analyses are not complete.; therefore,ECN 3198 is not closed.
TVA References (ECN, NCR, CTR, etc.):
EGN 3198
C•6huI~~O-EDC Program Manager
Cha an, OEDC P7l Comittee
3te-%
Date
'Dare
Black & Veatch ~ 6&.,& V ruo* oro"-- gs-we
Classification: Type Category H,
Black & V-eatch Senior Review Team Chairman
1-2 I -Date
Dati
C 6lajý)& Veatch Project Manager
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DE-SIGN
ENGINEERING CHANGE N OTICE N.39DATA SHEET NO. 2
Watts Bar tNudle Plant, S~ring. QLy ~I
m: D , Drolt er ý;kp2,,1 CGB.
I
Released By:
BRANCH(Z
- PAGE LL
7- (Desi---rrzroj4/ Manager
Preparing Section -. MEDS Accession No. ME.DS Access;ion No.
Prepare 0"/i ~ SWP 0L0813 5 024 WBP '830808 51(Total Pages (RO): R i0 01 537 RtJD '~fQT 9Section 1 r o B 8 U 2Supervisor:d -j5 6 RStaff Eng.o .I2 WBP F ~i .6
Brnc WBP '830708 517 _ _ _ _ _ _ _ _
- Chif: ~SCOPE
Project %WaJlS gar Atuelgaf P/a ^i Affected Units
System or Feature Pe4u1&#
Reference & Description of Change Re6J%&1VIa d'ý 9FlI 5,~p .- o ic
37z5 LV
r SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
PZ.DATE PR E- SECT. GROUP D.P.EC ~ DESCRIPTION OF REVISION roNO SUDPARED SUPV. HEAD CEFLRKMGR. P
iM te+ Duk jýes Jz
-I -D QW& - - --
gedMaterials as follows:
Additional Information:
Chief, Electrical Engineering Branch, W8C126 C-KChief. Architectural DesfignBranch, W4C 126 C-K Chief, Electrical Engineering & Design Branch, W20224 C-KChief, Civil Engineering Branch, W9D224 C-K Chief, Mechanical Engineering & Design Branch. 102SPT-K
C-f.,.1 n LzriLcsirgn tranch- W3SC126 C-K MEDS. E41337 C-K TVA 20575A (EN DES-IC
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO.______DATA SHEET NO.2
DR.AWING OR B/M NUMBERDWGREV.
ISSUE DATE1f1ýECTED ACTUAL REMARKSNo
I 4'7 1427- 213~ 2 -.330- N-/3-/3-3S4
__7____7 ;z I jk 3 , 2-zq-.?3[,1 3 -S-41
eI
I ______ ____________387______
I ~ ~ ~ B ______12______21143__________3-___-3 -- l________ A______________________________
L q7a4a'7-3~ -iS -5-io-'I3 Aj s-I -5W 1__e_ _ _
I ~~-511_ __ _
/ 7 I174-2-7~~~ 1_ Zo-291-631 10*3 131-5
AFF~E-TEDUN.T
d.IAA~ *~I
----------
FORM 3
WAITS BAR NUCLEAR PLANTINDEPENDENT REVIEW
1052 0DIN508610520.92.0000ref: 10520DIN3936
Find~ing Number /F /3 /4 /1I
Comments pertinent to finding:
Corrective. action is complete for unit 1. TVA committed to revisingN3-3-7A calculation package to include the evaluation for the relocationof a support. N3-3-7A has been combined with another analysis and itsnow N3-3-5A. 47W427-221 RO, issued February 24, 1983, shows the combinedproblems. The unit 2 analyses are not complete; therefore, ECN 3198 isnot closed.
TVA References (ECN, NCR, CmR, etc.):
ECN 3198
Program Team Member
OZDC Program Manager
airman, OED Policy Committee
ate
Date
Date
Black & Veatch Cjr 'C'%& AA&.-c %,
Classification: Type R Category
Black & Veatch Senior Review Team Chairman
Date
/2-11- fDate
- S fl. #~
TENNESSEE VAL.LEV AUTMOR ITY ENGINEERING CHANGE NODIVISION OF ENGINEERING OF-SIGN DATA SHEET NO.-
Wistts Bar Nudsw Pant, S26n; Cd L
m At ___________________o' ______
Preparing Section MEIDS Accession No.
Prepared 0~/IVi~U 0813 5Total Pages (RO): 2-. R J " 0301- 5SectionSupervisor:
__Staff Eng. or,(Architect. Z- 2lWSP `83 05 10 51GroupHead: 3 WBP 800Branch S - __ _ _ _ _ _ _ _ _ _ _
Chief:SCOPE -
oject wo/ i al "er P/A/., p4 -inystern or Feature 4LA ; 1
?vk L Eced a, Le tr
Reference & Description of Change R 9 ElyV l/
NO. -ISSUED PARED SUPV. HEAD "c-.IEF ýLERK MGR,
IŽL o 0T--
_ _ . ~ bc. .. ~DJDI -- YA
r IC E N . 2 BRANOM2 /,PAGE e
Released By: /r eir-ro Manager
I I MEDS A=ce-S~o No.
0 2 Jl'WBP '83 08a08 _5 1(
~~WB'83U928 52ý
p.
D6Alo5 I'
7 :
5' 1HRAfete nis e
" n. No._________. *
W'.eld Materials as follows:
Additional Information:
Chief, Electrical Engineering Branch, WBC126 C-KChief. Architectural Desio-;egranch, W4C126 C-K - - .Chief, Electrical Engineering & Design Branch. W20224 C4I,
S Wan)22 C-'K Chief. mechanical Engineering & Design Branch. 102SPT-K
TE)"CNESSEE VALJ..rY AUTHORITYDIVISION OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. I96DATA SHEETNO2
DRAWING OR B/M NUMBER
1 , IAA. -~ I
DWGR EV.
ISSUE DATE
f RFCTED ACTUAL I REMARKS F
7
ur'sT-
41 V1 4 ;W7- -s,4 ~ jT.5
2~~ De 4I. e 4e__
386 -3 L-io-!2A
I~~ ~ 147 1 -g
5 1 7 - .----
LJ
L 7L ~7 47-3 :1 1 I/ r6*3c-1,0313 1 P3 -:5!-,4
TENNESSEE VALLEY AUTHORITYWATTS BAR NUCLEAR PLANTAUXILIARY FEEDWATER SYSTEM
INDEPENDENT REVIEW
SUPPLEMENTARY REPORT
APPENDIX A BOOK 2FOLLOW-UP DATA
B&V PROJECT NO. 10520
Issued: February 7, 1984
TVA CONTRACT NO. TV-60052A
2]pqiarEA'epcFnqn~pW&-rchgUE
* 313FOR.M 3 10520DIN5152
10520.92.0000ref: 10520DITN3941
WATTS BAR NIUCLEAR PLAINTINDEPENDENT REVIEW4
Finding Number / F / 3 / 4 / 6/
Coments pertinent to finding:
Analysis problem 0600200-02-05 has recently been reanalyzed. The regioncontaining the spring hanger at node 133 is a common lapped region withproblem N3-3-4A. The reanalysis as a result reflected the load thespring hanger would see. Drawing 47B427-470R2 was issued October 31, 1983,which corrected the discrepancy. The work was done under ECN 3511 whichcannot be closed due to other identified work not completed at this time.
TVA References (ECN, NCR, CTR, etc.):
NCR WBNCEB8232 was written to address the discrepancy andupon ECN 3511 for closure.
OEDC Program Manager
k ýA\ G-4 I-dAS 'V.-1) I 5 F 111 ý Lý-aChairman, OEIý Policy Comittee~
is dependent
ate
Date
Date
Black & Veat ch jot,~?A" ~ ~ ~ -
Class if ication: Type At____________
Black &, Veatch Senior Review Team Chairman
Category
171Date
Da e
I
:31yL
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT CEB '8211 2~ CDI
CW REPO ,RT NO. WBINCB8232?AJWatts Bar 15 .ý 1 and 2
??ER:?ORGN~zTIONDAT C ~ W~ne/TPE-CEB-PAS2/ 11-9-82
rDizESplp IIOF CONDIT !ON1 -1 support de-signp load of 1850 pounds indicated on doc=t-ent 47-3'27-47CR]. for thevariable spring at node 133 is inaccurate. Analysis problems NN3-3-4A and0600200-02-05 have an overlap region with the inclusion of node 133. Neitheranalysis confrmrs nor is within 10 percent of the recorded support design value.T~n NCR was caused probably while transposing numbers from the computer printoutto the support load table and was not caught by the checker.
0 OFCCURENEES(~),cT. ) /82SIGNIFICANT CONDITION ADVERSE TO QUALITYD,:.a- r- CCURENE ES -XAGi. /82YESD] NOK"DO:*BRANCH
CHIFDT0 DF (E:', DES- EPSl 3.01 R /FDAE0
C 0RR:ECT 1V E AGCTI ON:
An' evaluation of the deficiency exposed improper lapping techniques used in-pob1em 0600200-02-0-5. The analysis was reanalyzed'followAing the WsBN Rigorous
rnal :sis Handbook-, sect-ion .200, which explains proper lapping techniques.Ine :r was perfo=ned under E-CN 3511.
*E111.tCTi yE ACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YE[ oO
0ES;:ý--C1E1 3CUETN.ECP O EUS O
EC-.'REOUIRED DJYES NO[: ECN NO. 3511 IL1SCHEDULE IMPACT El P lJA ElN
~5i6Ž~
Azs:'JA3L2 CAUSE: (REQU'!RED IF: SIGNIFICANT) w RP~ O
'IT7!13 IS A GENERIC CONDITION YES El NOE]
AC. ]ON REQUIRED TO PREVENT RECURRENCE: (REUREIFSGFCAT
INDEPENDE"NT REV-ý-: _
LA-2ZýPEST. ),ACT1.( ) HSCHEDULE EST.C ),ACT.(
ACT ~~VITV NO. ~ TASK DESCRIPTION DT NrAE
27, iSTI3UTONn26 ALL EN DES ACTION COMPALE-TE*
CONDST PROJECT MANAGER-ý=s RO- ECT ANAGR -BRANCH CHI EF/ORiG.
NSR (for Significant NCR's)
HAN.DCARRY COPY TO NEB-NLS
ŽýMlxr
ENGINEERING CHANGE NOTICECOVER SHEET swp '13 0314 506.
jeeproff ISSUAWCE OF OPEMATIMM LICZNSL
TENNESSEE vAL.LEY. AUTMOf1ITY usPo
DIVISION OF ENGINEERIN DEIG w ga %W SpurS Cet,
'To: CofmtTUaIon "ad~ MW-
From. On"~i Prood~ Iieao
DATE MAR 14 SMP11,
Wi IA.Mlysih Reaow: Yes__ No
p-=n ~q
SCOPE
DRAWINGS OR0 M NOVD Ye Data BruuCh wemcre w.Tefml
(Dita shoosts RecowW~) ^*&%Dat h AUe Au
No Asalocal
Electrical4 E o
M.Chbn5 Z.~
_____
wC 6AL Kati
Dam 4 RQw orPei at MTo
I. 2-"D aq
wmc itDabet o
V.Nw Bckoes' I~q Da
Sefcurl~ity lC sys em odified~ e
m jtt. oo..rtooa ccm. A"I '
1 a ", e
c-1 0.1 . ty ytw adI
U6too tsrUCu" zl
Mot'.--------------o--------a-------------
C.,, .. u~eie~wf. ~ ~iif.- ~it t.#4
M C6~ ~m*us..~ * i# #S#L I t ciI I v m f C .S* f . I # . M I W P S JCl
l1 .
:,.mi .r. 6it . 6.iS ~ *~ 14 ii ~ S S
STaNt4eE~ssr VALLEY AUTHORfDIVWSON of: ENGINEERING- OESI
ign rojct anag
--- ENGINEERING CHANGE NOTICE NO.___- BRAN4CH EGM - - -. DATASHEETNO.L2
PACE T!Walts Bar NludIerz Plant, Spring City- TN .
- -~- ~ -Released By:
S~~~A! T.... D0 )~.-*- -t 1 esign l'koiecManager-,
'reeparing Section
eare~ * -
[otal Pa;" (RC): d2~ection - --
Uu pervis 0-4:. -
rcitect -.
.MtLJSACcesston No. - -
V1WBP 3 0 4 8 51 5~
[WB 830.7; 7_->-50 4,
.. MtUb Accession No. ý-- -
WBP7183082Z97+50 -74032
~B~ii83 92S 5";
onc -- fhief:. SCOP
,~ .2 -- - Affected Units j~
. .... 77
.. . . . . . . .--- - - - - - - '-t.. = -. - - . ' . . . ..- or-..
efeenc &-escipton'f Cang.*............. ......... &S -E)Ue -~-,
.. . . . . . .. . . . . . . . - -
-- - -.- -. .- -. .--. v.. -...
- . . .., - ... .- -4,
v- .-.. . . . .. ~.- - - - - - -
-- -------------------. .77
S- .*-- ~ - ~ -- SEE ASSOCIATED DRAW INGS LIST.: R EVERSE SI DE . -L -
-7- -alTRP -=TE- ..k TOTAL_ _ _ I-i _ _ _ _ _ _ _ _ _ _ _ _
ISSU C MR~ SUV EAcHEsLR O. DEET 2W-s4 112 PAGS
_ .6t . *_- r,
% AV W. 7 ... --- .-
Mir'~ COST PLANNINGM CONTROL. 3TAWr._r-WSCC .4~-" ' --- -- -PLANT SUP!3IXTEMOENT"-- -41EF: AICNITECTURAL SIPPQIT DRAN~ CO ~ - . C3TjT~ RJC AAE -~" NI
E CIIExC KIWEDS. W5863 C-9
4EV,-ELM. vICA4EG IU-EtX IIU:*NQ 5xIASvCD$-W11*CI26 C-9 "--, - 7-77. .ARMS.- &W.CSTZ C........ ..
-4/ -~!2.J431 J9P Em p_ TI I~h2 -r\aA ~ri-i--r fG'-I
IEF., SPECIAL DESIGN PROJECTS. 1120224 C-9 S ,'- . . -. *
RSwp-'i_ 1" 5- t 4
T--ENNts_-vt VALLEY AUJTHORITY -~EGNEIGCAG OICE NO. 3
DIOVfISIO14 OP ENGINEERING DESIGN- -GNEN DATANSHEE NO'
AFFECT~~~~~~flW A~.~-~A.- .a-Iw SSUE DATE -
UI- -- DRAWING OR BIM4 NUMBER . 1 RE EXPECTED I-ACTUAL-_
_____ If- ~
________ I-, -7 rn Vj -12
-PAGE
-ZnNE
4 REA~KS- -D T.
Tq¶7-ý- Lo t _ _ __ _ _ _ __ _ _ _
44 P fl IS SD -A3-7- ~jT.-
~~ill
- jL-p- - N_ -
- -4
77 4?~- _D_ __ _ _ __ _ _
q-2L3_ __ _ __ _ __ _ _
-- ~ I2~I2A;JV14i ~
-'i- /vw~9~ 1r -1-3~ --
-z- R Z 7 -
1~ 377OCfT- L-.~l f\-5 _ _ _ _ _ _ _ _
14-713 ____ -a-- :77 =7ý,:-7
IF Ii1% ___________
7,1 417 IV- 6. -:/,9 15~L
TVA 2057SE CEN DES-7-79)
-TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. -3 F!,DATA SHEET NO... 1
ISSUE DATE I
I mw I DRAWING OR RIM NUMBER REV. I XPECTED ACTUAL REARSREV. NO.
17 /73 4-31-z-.383 3,-.B8I~ -___11__ __
ffiU74-1~72-0-Q- ZL-5 ý W3 -3- 3A
I 4-742~730a ±L
-I- '-7W4-2-7 - 20 / g 10:-9 /1/3__ __3
4-76-4-17-301 -4_ __ __1_
4-7 V 7 -- z LN3--3__ _ __ _
n -2206 -A4I c73g7-2 _
________~ll I- A/.3'M
PAGE F21rN UPDATED
DA TA SI-MfT
- - T 1
I _______________________________________
,35H ) "~/i Iý) "~4K 1 -1;, . I ~,EC6-i5ED VnE6kA1 LOAD
A
15 T6. 21
/I - - I -~
- -~---7(-.<~..--;-
SPRINGS (TPIPýý
LOADS REVISED BECAUSt OF~ REANALYSIS6 OF OVEM-I-APPNC. PPR01 1Vd9 0(oooZbO-0
2 -05 (gg 8Sy-k)
VI
(Co. kc I DTf 6sr I" C..: I wpvl-c- ý. I INS P 131-e-jAEC-jA'P0jI
Icn__l,--L Z+7ý1 L7 I , , I - I
LUG 5 LUG 5.DESIGN ALLOWABLE
LOA D STRESS
21w 6600
NOTES:
:I. LOADS IN POUNDS ON SUPPORT.2. MOVEMENTS IN INCHES. MAX] MUM
MOVEMENTS ARE FOR FAULTEDC PRIMARY+ SECONDARy)t. THE SEC-OND LINE IF ENTERED IS THERMALMOVEMENtS AND THE §UPPORTSHOULD BE INSTALLED VERTICALABOVE THE PIPE IN THIS POSITION.
3. DIRECTION - GLOBAL- Xi, Y.ZSKEWED- SX, SYSZ
4. TYPE-VS- SPRING- HANGAR-CS--CONS'TANT fO CE HANGER
5. LUG- STRESS IN PSI. LOADS IN -L S.THE LUG ALLOWABLE STRESS a WiSTRESS WHICH THE LUG IS AU...-ED TO INDUCE INTO THE PiP-E401THE STRESS DIFFERENCE BE"THE ALLOWABLE STRES ANO T"INDUCED PIPE STRESS FORVACONDITIONS. THESE ENT-WIESAUSED IN SIZING, THE LUG. SEE CEBREPORT 76-20 AND SUPPORTZ-E-.SIGN CRITERIA FOR FURTHIERDETAIL.
6. TRAVEL IN INCHES.7. CL-CLASS OF PIPE.
FOR REFERENCE AN'D COMPANI~ONJ1:WGS SEE SHEET 47v427-201
Auxiliary Building,
System N3-3-4ASupport Loads: AuxiliaryFeedwater Piping System
WAT. : MT I_-
I.. . ....
... .. .._ .........
-3- 1........... ..... .
......... .......... ............. ........... ...... ............. ................................................ .................................... .... ... .. .. .. ... .. .. .
......... . ........................... .
............................
........ ...... .... ......
........ ...............
......... ........ ......
FORM 3
WATTS BAR* NTJCL-kR ?LAN_'TINDEPENDENiT RZEV!.e7
10520DIN521610520.92.0000ref: 10520DIN4310
Finding Number / F/ 3/ 4 /7
0
Comments pertinent to finding:
The 1-1/2"-diameter line is supported by TVA 47A053 typical supports as shownon the attached HEU as constructed isometrics, H427-2 Sheet 11 and H-427-1Sheet 10. The deficiency in the WEN alternate analysis program is documentedon NCR WBNSWP8252 R2. All corrective action is not complete. ECN 3213 isscheduled to be completed by 12/30/83. The completion of all work associatedwi'th this NCR for Unit 1 is being tracked on Commitment Tracking Record (CTRYE346.
Isometric H-427-1 Sheet 10Isometric H-427-2 Sheet 11ECN 3213NCR WBNSWP8252 k2CTR E346
Program Team Member
OEDC Prog-ram Manager
Chairman, OEIV5 Policy Committee
Date
Date
I7 2Date
BlIa ck & Ve at ch
Classification: type /9 Category ~
6t'laO & Veatch -Project ManagerIZ//4,/43
Date
(~ fAAA~4j~P
Black & Veatch Senior Review Team Chairman
References:
I 2-It-83 INC:PFEDLIfIE REV~ADDED 5`15IIs TO~ HEI8RS 2-i AZ 55IJýPL
IfL,234 ZS,' ' ADDED AXO~L"4WAJ.a-AND YoID
!HCAIl.DIM,WzIR.ZQ li6,-AU~iiWhS Lv/WA. *C6JJ .1t
e>9-7.92..q PEOR4I W.'CM 1-50, I 4L ILIq"o AL (31 fEJ COnT ____ ESP'TIO0 jDSG CHf<D AFPP!
TVA PIP0UV. CLASS "C"
s Iqra MECA. AUXILIAlt-r FEEWATER
ctMZA U X. j 4L
FL. EL. 13-
Iq
AS CONSTRUCTE
Cc1T 1 ,ýi H 9E.U.0f~~ ~~ ~ C;, . N~ ? HANGER LOCATION
~' ~ ONLY.40~
-/.,> A',
1,-% lKi .. H E NU BE
/'r 8~ .- N0jj~g ovo No
YL ACMENTMostHORZONAL EIA
D~~ !k, T
3 PT/O ,D UL CI1~
.0i -o
N
~,~~'1~
TTh
HANGER NUPABER/TY BRIFS & Ný 70 BVB NO.
HORIZONTAL DIM.
VERTICAL DIM.
GENEI?,AL NOTES:1. PIPIN67*DIMENSIONS SHOWN
AR~E -FORREFEPENCE ONLY.N. I 1O INJL4\TIOW~
a ae Pr 13 61
1 2-13-83 INVC. Flc:H -/AI Mýr
-,VC. KEVLJVE REY: RELIALA1E. H6iRý. 51 7A 8BIADDEO SVSAS TO I4GR&.(.27,7A, 4 6.C:ib.TyP ON_ TWPH6&. I,Z.,,I o I IJ. -REv. 5Vs-0/y
H6RS. 1,2 il0 111. VD1IAT?.-*01N frRW'I1
~EFrMOMM~t 150'Sr.427-.ý. :AlIIZ T.A. iDESCRIFTION'-,.. DSGCHK'J1'PF~v
AS CONSTRUCTED~43f.4~~A LAS VC, dAm sPEc. C-3D CLASS`(
47v.w4-27-2 I:,3
TO1- AL'?L~O -3-6 'cJITr
___ H- 4a-7-zs 3 Zj SH
I-002pT101371
-VIrt ", fýý
TE,-.-,SZ VALILEY AUT-P-C :ZITY ENG
w nG, .~NC:SG
Ies
~INEERING CHANGE NOT-DATA S-KEE::T .-
X/
7,' D;/ 0e s - P7e-
01 2
WBP '830506
2IWRP 1R.1 s nQ
41 YfBP "83 8 04
50 r
~t-11L
NB P '83 0 815
WBP '830902
531.
523539
-hef -t .ý- .
Dae____________SCOPE
roject(' I?47C Ur~ 1VE i A7- Affected Units -I- ~
ystein or Fea3ture ~r'rS ih Ss~s /c~M /s)4zziaPd •/ ',.
ýeferen~ce & Description of Ch2ange .ZZ&. -e~~. '~4
- SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
EViDA7Z PRE- SECT. 'v--ROUP 3RAN-I ECN D.P. DES-CRIP'TION OF REVISION TOALE
10.1! !SSUE=) -AREDISUPV. IHEAD CHIEF CLERK MGR.PAE
ý77-- *J- m A t~b Dw.J6 FcL 2L;r.k ,AAI <7,1471 gj4e-45
16-1Jj15 31 jJT65 i n 16 j DpAcz 6~ 47A--(71 -7'-I-A-
pi r- 0/cY q . b~~, EDO Dj G N:. 47, 4 r. ZS ~ VS45C4
__ C5 A~D~g) NJ4r'
~u.is..-:~o i ~'?IT0tAm 4C-26 CAC0:STP.,CTICI -ý'E:T -k.E*&,C
>!z. CIi. 1; , It: t;hJCý. v90229 C-9 MEI.V34 -
,'~'. LC:' : ~L C. '.rfvlt ICI. 54ý CVC126 C-C Ol.64(7--I ' ýlE~C PI-ziECCT1. .7D224 C-9
E
h0
)tZIPacss R O:
zt1 Eng. a~
% -tcDs Acc---ýSion No.
NCE!11*0. ?ZI-T
e:; z r ea
..........
PAC: Li
TZ -iESSEE VALLEY AUTHORITYot. SICN OF' ENGINE.ERING DESIGN-
ENGINEERING CHANGE NOTICE NC. -32/370,,T ASH E ETN 0.
-- - .... L, flfl C.k1 bIt ILAOCO
OWa suDATE
IACTUAL REMARKS
....... ...
7:
...... ....
3z,/,.
I_ _ ____l- OR.,II .2 -
Z__ 47,442'7- -2 -/-& 2-g _ _ __ _ _ _
/'ý Z 47AeZ7-2 - -T 3 _ _ - - _ _ _ _ _ _ _
/,tZ- 47A 427-2 75 __ - _ _ _ _ _ _ _ _
Izj 47~4 47-2-/3I ,j53__-*
14Z 147A 4Z-7;--Z--/g _ _ __ _ _ _
1,5f~ 47A4427-72-2/ -~~_
1,;r Z%47.4427-2 - 2 2-~-31,e2~ -47A 4227-Z-:Z I -S- _ _ __ _ _ _
/ý2i 14744-Z7-Z-2f,_ _ _ __ _ _ _
__ _474 -479 Z-7 IS 1. 0 ig 17 -127
2- Arn-17>
____ý -1-0 _ -1 1
2 7 I47,44 -79 ---7--9A C) 6-30-Z3 i _ _ _ _ _ _ _ _
___I~130 0 t- IT vep~ra- Uj(,_$* 3-3o 44
7 7A.5 0~1-:,--4- -4
L 14 7A 560 -44 +3 3_ _ _ ___ __ __ __
___47A5ei' 0-4--+3 -. 30-&31
____ 47A-5ro -4 --5 __ _ _ _ _ _ _
S4~~~~~--30-63 _ __ _ _
*~E.-t5~VALLEY' AUTH-ORITY~I. ~OF ENGINEERING DESIGN.
ENGINEERING C'HAN'tGE NOTICE NO. 3I13DATA SHEEET NO. 3
2 OW I LINE UPDA T E.
DRAW-ING OR B ' NUMBER RIV I EIPECSýE~ Aý JA I I REASrP O
~-!s-e3
________~ -4o___
-I I qo_ _
I7 8 -4-IA q-{____913____
47A54 -5 18 -z3 J -t ~ ____________
o_ 147A45Zo-I __7 -/A 0_________j L l~eQ 3- 07 __ _ _ _ _ _ _ _ _
L~756oi-3 - *1
1 1/~-54 0[I
A A 47 Ocz-n-'-T7-/ZA -1o 4
I 4#?A5&c0~ z 0
PAGE Lý]L
7 = .,%ESS =E VA. LL-EY -' JT;HORI TYC;.-.'SON OF ENGINEERIN.G DESIGN ENGINEERING CHANGE NOTICE NO.____
DATA SHEET NO. ___
Released By.:______-s:NPD Project M~anager
Pr~ez.aring Section
F -e~aredDate
7o..ai Pages (AO):
Se-c-ionSupervisor:
Smff Eng. orArchitect:
G roupRHead:13
Br. Chief/ISOP Mgr.:
- -. I A
I L cze.s on . __ _ _ _ _ _ _ _ _ _
R________R,______I______________________51-t ,
J~J/
........ ...
.............
..........
..........
Affected UnitsProiect
Sys~tem or Feature
Reference & Description of Change
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
F. E V DATE PRE- SECT. GROUP AANCH ECN D.P. DESCRIPTION OF REVISIONNO.1 ISSUED PARED SUPV. IHEAD/ CHIEF CLERK MGR .
192
-- Z I
SCOPE
-.NzS'SEE VLLA-IY- ; S'tS4C i F E- \G: NEER17, 2E i.N
ENGINEERING CHA'!ýE =NOT!C-E No. ?
D AT A SHUTi :'o.3 A
C=AING OR = %NLJ?.9ER
ISS..E- ZIA7:
EXPE-CTEZ RE MAR KS
NEUPDATE,C DATA 9-4-E
IE .. NO .
1 4tk 2-ou 9 irn f3i I-7-- I _ _ _ _ _ _ _ _ _ _
. c-16- 0 _ _ _ _ _ __ _ _ _ _ _ _
* ___ -4-(o7E I 7 I _ _ _ _ __ _ _ _ _
__ _ ~-4- ?oAOl__ _ _ _ _
/ ~~-4- *IZI _ __41
141A48-4I- i7Aj8i
4--3A 5 6_ _ _ _ _ _ _ _ _ _ __A t
4_A_ _ _? - I -_ _ _ _ _ _
I -41Z 1-5 28
-Z- -4A5 -0- 4 -4 2__7_/0__U3
a 4-3G/I6-•3______ 6-sGA1fs7 3 I _ _ _ _ _ _ _ __ _ _ _ _ _ _ _
______ -48- - __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
W4'?A~,o-50Z ~i I____________l4-7/~~52-- -4- .516P I________________I '~ - 6- 4_ _ _ _ _ _ _ __ _ _ _ _
________________, (01 -3 \/ I____________________4_____________72 _____ -83___ _____ __________________________ .
0F -ED
PAGE Rl
7 - 5 7' (EN OES-7-79)
-=¾'NESSEE VALLEY AUTHCRITY. SION OF ENGI-NEERING DESIGN
ENGINEERING CHANGE NOT ICE NO.--,-.13
DATA SHEET NO.~
DWG ISSUEDATE
_____I DRAWING OR B!M NUPABER IREV. ýE)-SCTED ACTUAL PEMARKS
z.47A1560- 4-62 -I oto
a -4o 6z
4-- L O5 (__o___f_-_____
41A,5(o- 4- 35' bZ~-SE
-4d
-I-
15__ _ _
-3 -4
________ 18- Z-24-
a .~i~~-L--.------l - ~I z
-.55E (EN~ OE~S.-79)
- NSH~E VA-!LEY AUTHORITYz :O*. OF ENG;,'ýEERING DESIGN
ENGINEERING CHANGE N~OTICE =NO. _____
DATA -0ET,. -
-..- j RAV.!G OR B/M NUMEER
4 7A 0(, -'7ý7 - 2
ISSUE OrAT.
RE.EXPECTED I R E VA C Q KS
ý-?NE U~oATEDfZ DAT-A SHEET
" 47AC'~x5- ?7 -4 I13 -Z3 EEAIZA /.
0 O4-7,44ý- ';Z -1h2i A _ _ _ _ __ _ _ _ _ _ 2-
PAG 9
TVA 1057SE 'E-N DES-7-79)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO.____
DATA SHEET NO.-__
..............................
...........wr ....... ........
...........
............7:7
..........
...........
07:
..........
...........
...........
............. ..........
......... ............ ..
777-
M7
-- ----------
.......... ........
---- -------
..........
..........
.. ........ ...........
------------ *::.::
..........
..........
......................
......................
-7,
..........
..........
iýFFECTEDIWG- I A=UALo _______________
UNIT I DRAWING OR B8/M NUMS~E7R REV. FEXPECTED .R MRK
E i!G I NE ER fif\ O A N GE O~COVER SrHEET p
(BEFORE ISSUANCE OF OPERATINIG LICENSE)
TENNESEEE VALLEY AUTHORITYEDIVISION OF ENGINEERING DESIGN;,,-
To: Construction Project Manager Y" I
V ~' -
, S. ,.S
C NN0. Z /-3
V -ý'
From: Design Project Manager
DATE JA 4' fl&
Was lJ Analysis Required: Yes 1 No CjSwW/c--c8
1A),6 3
SCOPE V'
Project W414r77 03 4 R~ NV/e-6-LCAyj PLV7- Affected Unit(s) t ZSystem or Featurev-. aeýDp, S ý-r :- 4/,s~ R1,A/sWR8zszR1dPC ~P~Reference & Description of Change :rsgglde-.- lqek5'se.. Vy4?j Y5 'e.
/VC~~AI v>-rl/:Y1r pJ~s '745DRA4WINGSi OR BfM5S INVOLVED:
(Data Sheets Required)
ENGINEElRIN SUPPORT BRANCHES
Civil Y014S -O # W4Electrical
Mechanical
Nuclear
KUCLEAR PROJECTS DESIGN GROUPS
Civil
Electrical
Mech -1 6-Z) 1 'J 7-
FOSSIL, IIYORO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS
ARCHIITECTURAL SUPPORT BRANCH
PHYSICAL WORK MUST 13E DONE 8EOE
Pre-Op 1st Fujel 1%Them
Unitts)
Yes Date Branch-or Data SheetNo Available
-//0
ENINEERItld SUPPORT BRANCHES
Approval RequiredYes or1YJo
anch review:
? 12-feZ.)er DateI
App';?
EUS CIVIL R. CHIEF
E9S ELECTRICAL Bit. CHIEF
EU3 MECHIANICAL BR. CBIEF
,V4 -A~,~fA~7- Z-Chief Nuclear Engineer
Date5
Date
Date
Date
Yes or No________ Required for PSAR or FSAR A/c,_______
Required for Preoperational Test: _________
If Yes, Test No.-Vendor Backcharges InvolvedSeismic Analysis Required i >eiiNonconf.ormance Report Required
lit QA Applies
efuel z i~~ Vendor(s) involved: ___________________
CC (Attacnmne-.t- No - Yes zbi
CHIEF. ARCHITECTURAL SUPPORTBAC.H 2 C-KCItF, CIVIL ER ERN G BTBRANCH , W90226 C-CHIEF,. ELECTRICAL ENGINEEH1I NG RHANCI BC1Z -CHIEF. MECHANICAL ENGINEERING BRANCH,: vTCIS C-KCHIEF. UCLEAR ENGINEER. W10C126 C-9C?'I:EF, QUALITY ASSURANCE BRANCH. 5100 NIS-
CHIEF, COST PLANNING AND CONTROL STAFF, W12C74 -CHIEF. SPECIAL DESIGN PROJECTS, W202Z4 C-9N4AN1&;it OF CON3TP'SCTION. E7924 C-9PLAI 1T SUPERIR TLOENITNEDS. VS563 C-k
(.-17- .Date
Comm't
I
* _ - -r
s ns: tnis secz:icn. re: tz c Sae a as fi~~
I•PAVf i~'d~3J ~~/c7~Z J~~ f ~ 7' Zy 7'ýdIa
(84At2qý-
ieo0o1'2d vtt T ENNE SSEE VALLEY AUHIT 1171 1Y
WBP 83 ~2@ 163~:stez
-. :-J C 5zn&f~. roiect >Marnazr. .at-z~ Bar D-esign Pro-'-ct, 202. G-K
7- - L-- q :1.D '20 I-C ;-:3JEC: WAS BA NLER PLA-NT TUNITS 1 AND, 2 - NNCONFOMŽ-ANCE REPORTS '.BSWT?8252U.!
l~:S.3 2 52 R: , ;BNSWS306, WBzNSW,,P8306R1, `,ENS,;T S31 1, ANDWBNSWPS3llR1
REferences: 1. NCR2. NCR3. NCR4. NCR5. NCR6. NCR
1WBNSL.7PS25,)RLd -,BP 830919 022)WBNSWS252R2 (-,-%? 830919 019)1W.BNS1YP83O6 (WBN 830919 021)tWTNSWvPS336R1 (7.B=- 830919 018)IsBNSV?8311 (WB? 830919 020)WBPSTPS3llRl (IsBP8309,19 017)
Atzached are NCR's WB.N\SWP8252R2, 1-.BNS1N-?8306Rl, and WBNSITP83llRl which identifys 4 _=iicant zonditions adverse to quality which are to be processed inaccordance ---t-h EN DES-EP 1.26.
A-'So attache-- are NCR's WBNSvP8252Rl, W-BNSWP83O6, and WBNSWP831l which havebean superseded.
W. Anderson, M155G MIB-KG. Beasley, W12B21 C-KJ. Cooney. W6D224 C-KN'. Culver, 249A EBB-K0. Barnez:, W9D224 C-KK. Hannifin, 206 'GB-KG . Pratt, 323 GB-K
R.?aulsz:z, 1'10C126 C-Kj. Ritts. W1%-OB8l C-K,%acewitz. Watts Bar CONST
T . C. Standifer
x !U
RC-?: D3A- a c='en ts
cc (Attachnents)::EDS, 7^-363 C-K (w/original of-, NCR 1WBNSWT8252R1)
R.M. Pi-erce, 104 ESTA-K~.D. ::-lley, 210 GB-K
M. N. SErrouse, IW1Lk9 C-K
Pric::llv?repared By': R. C-. Pratt, Extension 2730
B:ý. U.S'. Saulings Bonzds-Rc-z:%ri:,1- onz the Payroll Sat-ings Plan
-. 3
K4
I
D!VSIO SO00F EN G E E 2.=- ES N
NCNO~FR~AXCE~E~~T 83 0919 01~
D-ur-_ing th .e :ast several =~ntns a number of NCRs h-ave cean -.ý-ritten against various aspects of
anrntey nayzdpipllng. This ;C!. is ý,rizt:E- :z z c:d ate thne azi-ýro p.~-:ae NOý"s plusan-: othr nzncon.foirnin izems- found cUur-L. I' s :zaz to v eri qua_-lifL:icat ion r equa lifica-
ti.CM of WBN piping supported in accordance -wi-"z the Ad",N tcrnate ALnalysis Criteria
(C- 76-5). This INCR will be used -for consolidated r rn of the above mentioned program..I- prviouslyv identified NCRs totally included !in this NCR are:
WB3:_:sWvP8220 - Alternate analysis not properly cend.No WE? engineering procedure tocontrol alternate analysis
W1B::5SWP8231 - Technical deficiencies in analysisEN2BS2.8- Flanged joints not analyzed
* W3::sw?8160 - Interface between alternately analyzed piping and deadweight supported piping
not correctly analyzed1N3::5w-.JPE306 - Use of CEEB 76-5 to analyze alumninum pi-n*-Tis poiping is not written the
scope of GEE 76-5.WBESAT?8311 - Use of GEE 76-5 to analyze schedule l0S stainless steel piping. This piping is
not within the scope of'CEEB 76-5.*ParzA ally included in this NCR (last sentence
DA7z? C) OfCcUFR=ENcE ESTi X). Ac7. (I )17
7: MET-Z:D 0- DISCCVERY Design Review
C.-ODE (ENESESO)N
only).'C. 5Ic.NI=!Z.N'T CIONOMTON ADV'ERSE TO CQUALITY
y=EZ X!~
r, a C.
CC = =C7 IVE AC710N: See attached sheet.
cC~E :. EAC7.:% DEVIATES F:.S 'A DESIGN CRITERIA RO!EETr
* .- C~E ~,,~3213, 3549 sc,'r-Ir.PACT .3 P7
9 // 6 /A
N 0N CON'F 0 7 1 - -! --E R E O ý
c on izcEns riave beens identified as zauses ncchsE decicienc~res.
Filure to provide adequate analysis zt:s
Failure to prov-ide an analvxsis procedure.
THIS IS A GENERiC CONDITION YE S NO
ACTION rEOUIREO TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANTi
See attached sheet.
* - INDEPENDENT REVIEW:
LABOR EST:). ACT. I M ~\ H I L SCHEDULE =571.[ ACT. I I
I cACTIVITY NO. 23TASK DESCRIPTION 2DT NTAE
i7-R E AR KS:
CO~T ROEC MNAERR. G. Pratt, 32-3 GB--' 275! ALL EN DES ACTION COMPLETE:C'DES PROjECT MA NAGER
C-S.ESS
f for Signifi.arnt NCRs)*.E0S C ISXS (fcr 5infican.t NCRs)*
A-S!SITA'.T TO THE MANAGER OF OEDC (Olualityant Ný;:ear Saietyl..ior Significant NCRs
7- zR!-- AFTER THIS SIGNATURECOYT E-L
* 5 FANC H C H I E ;ORCG.
I`E!=DS ACCESSION NC.
v.3- ____N-
:ecorr-: :'.'e ac:i- for :h~si czzii i O vrfcai:o
r:-otram involves piping in t--a zcc:a cf -z-iz of C B a n WE?.
7.no!Uce- in W?'S sCsooe ik S~- C ~ c -.7ONoae supports inaccordance with drawing series 47AC3-3 ýfr prcess pipes). 47io31 and 052(for instrument lines) anAd L71054 "f -or :2-ntrc-l- air lines). These drawingsýrovide znuidelines for locatira7 an- su:ot-; e -mc supports.
SDES-S7EP 82-18 Program -For 7iemt ~l: isi - Coordinating,Documenting, and Verifying, was ur-::re to ccn rcl h eiiato rga
for process piping within WBP's sc:m-e. GEB's verification was performed.;-- accordance with thi omlaavý rodrs. Instrument and controlair line -qualification was determined *- separate calculations by CEB(0:3 83091li 001). In all cases.,E e~fe all supports as adecuate orcorrects them, by revised drawinggs =der. E-CN 3221-3 (engineered supports) orv-ariances (typical supports).
GEE 76-5 has been revised to clarifc- some areas of- the criteria and providesuidelines in others. However, in :orcer to --ninize additional field work,
t'he verification of Gcualificaticn of t*-e_ pipi-g is normally e-valuated againstcode requirements instead of solely GEBE 76-5. The verification methodsu-.ilize hand calculatilons as well as ccnruter analysis to qualify pipinganalyses which do not meet the speci-fic rules of CE-B 76-5. V7,ne majority of the IWE? corrective action, on Unit I was carried out by a)ersonal Services Contractor; howe-var, some was performed by 'WEB personnel.
1he Unit 2 corrective action will be handled in a similar manner.
18. ACTION REQUIRED TO PREVENT RECU31RiEN:E: (REQUZR--'ED IF SIGINIFICAM7)
1 CEB 76-5 has been revised to clarify- some areas and provide guidelinesin'some previously unaddressed areas. Portions of SW?' EP 43.21, AlternateAnalysis of. Piping Systems - Dczu=-enting and Verifying, address varioustechnical areas. The 47AO53 d7aw-iz~s haves been revised (under ECN~ 3542)to clarify some areas and to require all wiigsupported in accordancewith these notes to be reviewed by X?
S. SW? EP 43.21 has been issued to -conrol th*e analysis of alternatelyanalyzed piping in WBP's scope. In the tuueCEB will not analyze WB Npiping by alternate analysis. x.kny reaanallysis of their current alternateanalysis problems will be by riro7--rcu--s analvsis.
-. Training in alternate analss - t4 s has been provided to 1,.? andCONS? DErsonnel. :he subjects -- :e-se zrair.:nn sessions ,.7re GEEB 76-5,SWTP E? L3.21, and the 47A053 drwnsas =anoron-riate.
'T- 1 C'7=7
DIVISION OF ENGI%=E= 2 DQ S IG
n c
C t CD D1ITON
_2--~- :s: SeV....ý =..:.:1hs a crfe o:_:.s ..- cu a-E~ 0,:
-- ~t ~ an7ze mn. hs NC?, is wr~.~cnc~aethe appronriate NC z ius::-ezz-c---ig I t ems Tour. 7ua_ : a 1_caz'_om r-ual-;ca
:ngsu-:Dorted in accordance_ e -:,.a ~rae Ar>s SC r t Pa7-- -6-5). This NCR will be used for conso':cat&: rED-crting o:h:e above týiEntioned program
s~c::previously identified NC~s total!ý: inazluced 7.-~ 'CR are:
;78 2 2 C - Al1ternate analysis not properly docunantled -pro:merly.. No 57-7 en~ginleering procedu-tc control alternate analysis
S-782L - Techinical deficiencies in analysisC~26- SAGs and DAGs; computer programs not .-ualified for alt-ernate analysis
.C S 21E - Flanged joints not analyzed- I A - Aial restraint not p~rovided bv su-,onorts
S~l~- ±nterl~ace between alternately a'nalvzerF DiDinz and deadweight supported piping* not correctly analyzed
~--i~jzminluded in this ..CR (last sentence on!,.-)_:j * CCENESTXACT.( 1/76 WiSIGNIFICANT CONDITION ADVERSE TOOQUALITY
rri c- ) OF C SOVERY Desionr Review E NO-F& RANC'-;CHIEF/DATEXA k '---:)E (EN :ES.=SP 8.01) NA~-
:71, EC7VE AC7ION:
==:71%'=_ CTION DEVIATES FROM A DESIGN CR17ERIA REOL';REENT Y =SW NE
7FW.!*. C!EiA DOCUMENT NO. =XCcEFTI0'; REUEST NO.
~YE N~ ONNO 313__SC'EDULE V'.t?ACT P A
%CC~CRM.~NE RORT
ElD R EP --.= -T S 2P
-'NASLE CAUS2: (RE:'JIRE: IFSIGNiFiCAN'7
iHIS IS A GENERIC CONDITION YESED NO L7
F71ACTIO6N REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
59.04 ENGINEER REVIEW AND CONCURRENCE:
I LA=Q0 EST. C ). ACT. ( ) MH 21l SCHIEDULE EST. ),C.ACT.(
ACTIVITY NO. TASK DESCRIPTION DAEIIEAE
125REMARKS:
I S-:erseded b-v NCR 1-bNS';,?8252R2 (W-B? 830919 0191)
0!': ' D!IBUTION: ALL EN DES ACTION COMPLETE:=ZNST PROJECT MANAGER___________
E.DES PROJECT MANAGER EBRANCH CHIEP/CRG. D
-EC CAWES(for Significant NCR's)~
* E~S(for Significant NCR's)
Z ERIBUTE AFTER THIS SIGNAT URE%:)DCARRY COPY TO NEB-NLSc
T0: 'J. C. Standifer, Project Mianager:, loqa:ts Bar Design Project,204 GB-K __________
7%A
John A.. Raulston, Chief, Nuclear Zgineeriag Support 3-ranch,W100126 C-KI
SEP 12; 19i83SUBJECT: WATTS BAR NUCL!A PLANT - C 0v,---. MEMORSZE~NT (No. WBN::
Atced I& tmný u Bgw-E 3q4 for which responsibilit~~ rassigned tOA at-s a~ Designroject and Construction. It is ben i*t,=~-Vb1for your information and for forwarding to CONST.
Please note that comnletion of these co=itments is due on or by `0_____ _ t_and V"~~.~. '1- ,rseciey Accordingly, please support con~tr~z-tT-x7`activities so that they may meet the co .letion dates. if your comý.--i-'n4ate__iwill not be met, please inform NEB-NTLS by \ A3
LZL5
If you have any questions, contact Jerome Prahl, extension 7160, wl~e-i-s---~idllngthis matter.
John .- ul'ston
JAPr J1.9 G. Wadewitz, Watts Bar Nuclear CONST (T-ýAttachment f the completion date will not be met,cc (Attachment): provide NZEB-NILS with a request for extensionb~"
MEDS, W5B63 C-K 75 \k. , tet '<R. Mi. Pierce, 104 ESTA-K
- -- . . . . . . . . . . . . . . . . .
To: John A. Raulston, Chief, Nuclear Engineering Support Branch,WIOC 126* C-K
From:
Date:
________________Nuclear Plant - Commit-ment 'to._________
The following information applies to the subject commitment:
COMM4IT'I'NT CLOSUR.E - "The subject co~it~ent has been fulfilled (date)__________(initial) ____ QA document _________(NCR,
EON, etc.) has been signed for completion of work required ('ifapplicable).
EXTENSION REQUEST - The commitment will not be completed by the duedate. The new date for completion is : please reviseyour records accordingly. This request h~as been coordinated with
of NTEB-NI.S on
(signed) (Project Manager)
Attachmentcc (Attachment - closure only):
HEDS, W5B63 C-KWBNE .HW
WSP
-34~2,
V~O6! E C~-o4:. COMITENTTRACKING RECORD2 GTE M CECU N DU % ID-ilCT
¶ ~CNSE~EORGAN ZATION
1*~ c~i3~. ~ c~s~
FILED DATES DATE NUMEER
Z 3 4 - 2 3~
COM27~ENTTITLE X- *
7 SAR TERICAL 8 NLS 9 COMMITMENTRESPOSIBILITY RESPONSIBILITY -LOCAT?ON -- -
:cpe Se v t1-3 u-4! 3
10 RASOLUTIO (FL RCORD [FONLY T COSURE WD O) ORNUEOL
11DPA.tTOC~VNT RSSE RCIGD
1. CLOSIN COMMITMENT:~ [DC TYS ENTERE:
(STATUS±! A NDl~si 6NTUTHiONS-OVER)cA-;ý '
13 STATUS
Instructions:
-~The organization making or identifying a commitment fills out Commitment Tracking Record (CTR) bIocr..2, 3, 4, 6, 9, and 11, and (ifknown) block 1. Block 1 should name the responsib~e organization, and inparenthesis a person tzo con-act. Cormmitmnent Location (block 9) should cite dociments containing the
* commitment, (e.g., SAR sec-tions, NCR number, violation report number), and should include the MEDSnumber when it's known.
The identifying organization them immediately transm-its the CTR to N EB-N LS.
N EB-N LS assigns the identifi cation Number (block 5), and transmits a copy of the CTR to the responsibleorcanization and'othe-- aff---t.etd orcanizations.
* The responsible organizartion then (1) controls the commitment (i.e., per-forms the actions committed);(2) upon completion of the committed action, fills out Resolution (block 12, seee note) and returns thecompleted CT R to the Chief Nuclear Engineer, atenzion NEB-NLS, by the return form portion of therelated Transmittal/Return Memorandum (T/RM).P
Note: The person(s) making an entry at Status (block 13) or Resolution (block 12) must initial and datethe entry.
The intent of the-resolution block (block 12) is to provide evidence of resolution, or else to provideN LS with infrmatiJon required to track the commitment to completion.
The resolutic--i block should either (1) identify the resolution work and its date of completion, or(2) cite the tnansfer of tracking responsibility into an equivalent tracking system.
In either case, the MEDS numbers of applicable documents should be ircluded. In case (2) theresolution blcck should inclJude the equivalent tracking system's name and the entry number anddate.
FOIL% 310520ODIN50 9510520.92.0000ref: 10520DIN4034
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F / 3/5 /lI
Comments pertinent to finding:
Black and Veatch recommended that the rationale used in establishing thepressure switch setpoint (for the runout protection pressure control valves)be included in the calculation files. We agree that this was not fullydocumented 'and we have placed a copy of the Form 1 and Form 2 comments inthe calculation file to clearly document the rationale used. A copy ofthe cover sheet for this "calculation" is attached.
Program Team Member
OEDC Program Manager
Chairman, OEDC Policy Committee
3te
Date
Black & Veat ch -- 74 2,-:;
Classification: Type Category /
DateJ
Date
Black &Veatc Snor Revieiw Team Chairman
EN DES CALCULATIC!,S 3;
X'~Sc)UNID PLANT/ NIF116 -5'V~yAx/,,~ SYSTEM(S) /71V
PREPARING ORGANIZATION SRSCINREV (FOR MEDS USE) MEDS ACCESSION NUMBER
APPLICABLE DESIGN BRANCH/PROJECT RO I- 83 1 4 0DOCUMENTS IDENTIFIERSW . )3 1 4 03(f,/ CtqqW v6N -CA -bU63r1j61~ 35 14-H& - :CK Rl
-110153R2
KEY NOUNS _e~ &
REV RO Rl R2 R3 O RBEDATE ~~ENT O RBE
CHECKEDSr&/J F 7 "3- -
iyI DQ
AP D
ATTACHM TSMICROFILMED:,
LIST ALL PAGES*ADDED BY THIS REV:
LIST ALL PAGES *DELETED BY THIS REV:
LIST ALL PAGES *11
CHANGEFD srTi-jSilS REV:I
TVA 10697 (ENDES-7-78) *Use revision log (form TVA 10534) if more room is required
0/7
FOIL% 310520DIN509610520.92.0000ref: 10520DIN4035
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /IF / 3 /5- / 2/
Comments pertinent to finding:
The Senior Review Team recommended that the records for specific valuesused for the accident analyses be updated and clarified. In order todo this we have placed a copy of the Form 1 and Form 2 comments in thiecalculation-file. These comments clearly document the specific valuesused in Table 3-1. A copy of the cover sheet for these "calculations"is attached.
Ji Prog km Team Member
OEDC Program Manager
Chai.rman, OEDC Policy Committee
3t C
Date
Black & Veatch 7X_ /7 ~ ~
Classification: Type
/ 6 11a & Veatch Project Manager
Category /________4_
Date
2-/i1'DateBlack & VeatL'h Senior Review Team Chairman
J
EN DES CALCULATIONS '947
TIlTLE 1ýInk44/,Y7 AOL 70~ '77(C4ý ý57-1:5lfl- UNI PLANTU7
c~~F1Xl,, lzl )-1ý7 SAR SECTION(S)
PREPARING ORGANIZATION REV (FOR MEDS USE) MEDS ACCESSION NUMBER
//C--A---,- RO EB '83 1104 302APPLICABLE DESIGN BRANCH/PROJECTDOCUMENTS / IDENTIFIERS
KEY NOUNS ,411X ~
REV RO Ri R2 R3 TATMENT OF PROBLEMDATE ~
~ECKEP _ _ _ ,6,O - 8/ /,~~ ~
______~•fz~~0040'q /6~
MICROFILMED:-
LIST ALL PAGESADDED BY THIS REV*
LIST ALL PAGESDELETED BY THIS R1EV:
LIST ALL PAGES _ _ _ _e0CHANGED BYTHIS REV:
C-/Y6 72/6#6Z1 ?~•6~5 c•~~~' 3,fc 1 ~ ~
~4iJA ///,d6//&~ 7<3 g ~ 7YA-'(J / ('Xf'S ,f~3A'&~6'5&iiS
/ ~
TVA 10697 (ENDES-7-78) *Use revision log (form TVA 10534) if more room is required
6s~/yyJ'~ 6J~C
,ýBSTP ý,,CT
/ . ý-- -rl ý 11 ý/- 1)
FORM 3
WATTS BAR'NUCLEAIR ?LANT-IN'DEPENDENT REVIEW
10520DIN521710520.92.0000ref: 10520DIN4311
Finding Number /F/3/57 /7
0-PL
Comments pertinent to finding:
Support 03B-lAFW-R55 has been revised from a rigid restraint in the X and Ydirections to a rigid restraint in the Y direction only per the latest analysis.This corrective action is complete and support 03j3-lAFW-R55 R901 was issued.3/10/83 under ECN 3198.
References: EGN 319803B-lAFW-R55 R901
Program Team Member
OEDC Program Manager
Chairman, OEDC P~§Iicy Committee ec
II7/1e3Date
/Date.~
Date
Black & Veatch a. ý.
Classification: type Category I,
Date
DateBlack & Veatch Senior Review Team Chairman
COVER S:-W'L--T SW-P(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUT HORITY- -- ..-.-. ,.n nCC Kll
0813 50.0 SlI
ECN NO. - /
DIVISION OF E.NGINLLKIINkU Luct ' WAaXs 93r Fu-. ia.rit, SP6119 City, TNTo: Construction Project Manager
-From: Design Project Manager SV 0 3-
DATE UQ 1317982fjw 2.-DeATEN~
Was IJ Analysis Required:
Secti on
IReleased: Zf~esign Project Manager
Date
K ~~~SCOPE " ,(-p/A .- 5 f .
Project AL/lt /f /C)/'C1 Affected Unit(s)______
systm o reiui j- S-14 / IF v• 5'(v ,' '5~
Reference & Description of Change !-., 4ý 10 ,4u z-eJ'q .4"? . ~eq ~yvp'3 Jii¶
OtW 'k S ~eci( ~/ C/gM 0,,, yewc.r fac/i~ -re tcý 'f:1 z 0 .0 7"C - %J -e
DRAWINGS OR B/M'S INVOLVED: Yes JDate Branc, nineigBace e rN
or Data Sheet Thravoe EnineigBaceYsorN(Data Sheets Required) No Available Approval Required
ECN is r pI~ nch review:
Thermal Power Engineering Branches
Civil 7/44'1Electrical
Mechanical
Nuclear
Thermal Power Engineering Des Project
Civil
Electrical
-Mech
Analysis
Arch, Hydro. & Spec Proj Eng & Des
Arch
Civil
Electrical
Mech
Ye 3
/410
Ces'Ign Project Man erDate
Approved:
TPE Civil Br/~ Chief Date
TPE Eiectrib Br. Chief
Chief Nucleffr Engineer
1.4
unit(s) 2 r
cc (Attach~ments): ~ .)~ WC2C-KChief. Architectural bfgn rnh.WC2
Cnief, Civil Engineering Branch. W90224 c-K
Chief, Civii Engineerina & Design Branch. W3C126 C-K
Chief, Electrical Engineering Branch, wBCI 26 C-K
'Chief. Eeictrlcai Engineering & Design Branch. W20224 C-K
MEDS, 100 UB-K
'Dat'
Date
Reaq'uired for PSAR or FSAR _____e ____
Required for Preoperational Test: S
If Yes. Test No. 7-1/ 72
Vendor Backcharges involved N 7Seismic Analysis Required__________
Nonconformance Report Required __________
QA Applies
Security System Modified /
Vendor(s) involved:
Chief, N~uclear Engineer, w1bC126 C-Kchief, mechanical Engineering Branch. W7C126 C-K
Chief. Mechanical Engineering & Design Branch. 102 SPT-K
Chief. Quality Assurance Branch. WlIC126 C-K
manage, of Construction, E71324 C-K
Chief. Cost Planning and control Staff. W12C74 C-K
Plant Superintendent
J" . .hc I "
CS 8 X( Y27tK *L G. W_ HOLE ___ -
S~~~4~I~J+ x YNGL E (X-4L.
7 i ~ a.-B PIPE CLA&MPP (E-E SHT. 2-OFZ_ __
- !E~ L EL.. BY T.Y.i
m~wmrUN ... ....
3/98, Nr io ~ I' /ta t~l~r flhk !& ...
-. a.
VSI
f~I - WI - I r- - ~ -
A]
41~~
JAg 47W42.7-2.21ý-RO'
*DIRECTION: YTYPE. __ __ __
+ 2000 .
7~NA- 3000
1<
I ®'ý
8. PI E S17F
VERIIEDELEV LOOKINGAS
APPRdVgt)
DRAVO ISO #E 2 879- IC-17-2DR.AVO CORPORATION P.O. # E-2879-CU~~~r~CONTRACT # 74.ý 38-83015
a"%A1Ts &AR NUCLEAR PLANT -UNIT #1
EAST
N UCLEART.V. A. CL&SS
PIPING SYSTEM
REFERENCE owG,
*LO.CATION.PLAN
£LOAD;
AUX. FEEDWATER'47W427-1-4i (SPipe)
kA&rKN 140.FWR5 HREQO0..L.......-IOCAVN ICHK*D. IAPI'YD.I ATI
B11GEN-PATEPISON PIPESUPPORT -'CORP. 7-N~
aId a $4%mpa~ ""oo CA.~~sS up. -L kA PuP,~ A
-tx I 4__ C. -y- v- 3 6AIt~
of KAI? I ium I
LLEL -Wll 0ý.
48N1219-2-9-
Itý4ý+
7ECITO4 . . - S
_____ .. ...
JW1
NERIFIED"
AS 8 7APPRoVED*.:
5ECTION A-APROJEC W Bt\N '_ =,M 30) 83DRA'WWG$ 038- 1AFW-Ro55
DRAVO ISO #E-2879-IC-17-2DRAVO CORPORATION P.O. # E-2879-
? 7 . . 7 .
NJcLEAMT. y (2"4s
PIPING 3YSTEA AUX. FFEEDWATER *.
IIuj .7k.~ CONTRACT # 74 C38-83015 ..
-wrra BR riu..LtA PAN - NI #REFERENCE DWr, 4l8N1219-2 8 _ -t 1
C~5J~uU(~ ARKmo _03B-IAFW-R55 No. RecO
DRAWN CMK'O. ILPJY0.1/13ERGEN-PATERISON PIPE SUPPOU1T' CRP. ,
OflrrosuRGH F& LR.Wý019V 0 ze&q 30R, goroo. MASL *woý-nd
............. .......... ..... ... .
............. ...... .. ............... .......
.......... ..
........ ..
a.
. . .........
a
.. ..........
M: ... w ...
...... ......
FORM~ 3 10520DIN521810520.92.0000ref: 10520DIN4200
WATTS BAR'.N7CLEAR PLAN-TINDEPENIDE N-T REVIEW
Finding Number / F/ 3/5/8/
0
Comments pertinent to finding:
Support 03B-lAFW-V57 R901 was designed per isometric 47W427-204 RO and loadtable 47B427-385 RO. The support is now shown on isometric 47W427-221. ROand loads are on 47B427-520 Rl per reanalysis und 'er ECN 3198. The supportw4as redesigned and issued-as 03B-lAFW-V57 R902 under ECN 3198 on 3/10/83.Load data on the support drawing agrees with the latest issued load table.Corrective action is complete.
References: EGN 319803B-lAFW-V57 R902
Program Team Member
O~C Prgrm anager
S ~ 5 W ~9~cMc~Chairm~an, OEDC Policy Committee
Date
Dbate
Date
Black &Veatcho-4.
Classification: type ,~Category A
Vetc -ProAj ecMnaeBlackc & Veatch Senior Review Team C~hairman
//ate0-
Date
TV 07C(FN DE!-1 -i ~C~ ~ aj 1 0 NO ICEC 0 [ s: -n;: SwVT c3 08 13 5 00J
(BEFORE ISSUANCE OF OPE RATING LICENSE)
TENNIFSSLE VALLEY AU]THORITYDI[VISION OF- ENGIiNtLER~IM, ~ I~-"
To: Construction Project Manager Wx 3 uv-rPat p~qCtT
- ~ ~ - -- ~" ~SwVP 204 C-B-K
DATE A~UG 13 T1982
Was IJ Analysis Required: Yes
ci
NoA X
con 2 g jýtinLeader-Section62
elease: Datýeleased: esign Project Manager Dt
~r~cI~ /SCOPE 6/loeLpM 6 o- Mo3
Project Ali 8ciV)Ce u Affected Unit(s) / -j--,. 1_1- 72
re
Reference & Description of Changecic 1-n / C/gx " ~ Ae y e/erk,?k VSý-
V,, We~ a7- cn //~ ,r- .iat&/L*.4 4 -
DRAWINGS OR B/M'S INVOLVED: ors Data Sheet Thermal Power Engineering BranchesYeorN
Clhae+e Reriiiredl Ki- available Approval Required
Thermal Power Engineering Branches
Civil 4/1 2-Electrical
Mecha nical
Nuclear
Thermal Power Engineering Des Project
Civil
Electrical
Mech ~Analysis
Arch, Hydro, & Spec Proj Eng & Des
Arch
Civil
Electrical
Mech
Ye 3Alp
All0
Approved:
TPE Civil Br Chief
TPE Electri~i(Br. C hief
T I ecana r. hi
Alt
Istefuei
Unit(s) -
CC (Attachments) '1C-hief, -Arch-itectural efgB rach. W4C 126 C-K
Chief. Civil Engineering Branch. W90224 C-K -
Chief. Civil Engineering & Design Branch, W3C126 C-
Chief. Electrical Engineering Branch, WBC126 C-K
SChief, Ecictrical Engineering & Design Branch. W2D224 C-K
MEOS, 100 UB-K
Date
ate
Chief Nucle~rEnlgineer Date
Yes or NoRequired for PSAR or FSAR I
Required for Preoperational Test: Z_Z__________
if Yes, Test No. T~4 2
Vendor Backcharges involved NSeismic Analysis Required K
Nonconformance Report Required - re.f
QA Applies Ke 5
Security System Modified A/6
Vendor(s) involved: o,
Chief, Nuclear Engineer, w10C126 C-K C-
Chief. mechanical Engineering Branch, W7C126. C-2Chief., mechanical Engineering & Design Branch.10 SPT-K
Chief. Quality Assurance Branch, W11C126 C-K
manager of Construction, E7B24 C-K
Chief, cost Planning and Control Staff, W12C74 C-K
planit superintendent
ECN NO. /9
k . 0
DESCRIPTION.9-9- ,. - V - -
Z? 4 WELDlNC% LUG1
z 5/s -; Y. K Z'/LG1. 50T W/AHtR.NUT ____
344 I~z V 7C V.S., .. fo,*CLmS/)____ MYT. Yi&j p W1IT V L:ST 0P.S
- l !4 AHH NUT.. I 93A /2' 0 X 1- 6Y2: LC&. WELDED EYE ROD THO.2___G1t 304- 'a, 'IP CLAMP
7. 2-. C)Q V72." 0) 1V4! L6,. BoL-ra I c 5o 4- X:/'P, 7" LG~. W(2.) 5/8'0 1OLE-S 3' _ _ _
gy 2. 1512.0 '/2! CONCRYETE FA5TENER (PHILIAPIS RrtHEND)______
- - - -7
15S.SWIP BA~tF METAL. PAat4TPn &4 E& 5 Y. TVA.
) By TVA.
r-AV-MO vi jLD I I
JAZ
4
lw
:1ý
7Jji
10%w,
S T. V.A. CLASSTVA 1 Qt0~rA Onf
M 47W427-ý2ý2_*'RO
+ 0
PROJECTC 0NT RACT v3 vý-DRAWINGOt~bt-I KrSHEET -:- ~REVISION
UNAT 2
-LOCATION PLAN.'-.c_
LOADsDRAVQ CORPORATION P.O. # E-2879-
CUTOPIPING SYSTEM ALIX. FEEDWIATER.U~iA. CONTRACT #74 C,38-83015 fftqej
REFERENCE DWGý 48N1219 28 (St 19W6'1T~rS BAR NUCLEAR'I'LANT -UNIT #1I R O 3 IFWV7~R Q~
CONSuMCM
DR1AWN CXK'D. APPYO.1 DATE
BERGEN-PATERSON PIPESUPPORT CORP. -C O. t ~ HTi
DAOmgue.A ISO ~ fVA w#v.aanc...i.. tEVA/-9
DI * -,
,NO.
DRAVO ISO #E-287~-TC~1 7...7
DESCRIPTION
Id ~ Lr- F439______00
i~I - --
1171411?
TA18~ - pj'A
7,-
I~1i AS ,SfCF/IOAN A2Z-A 2
PROJECT\N\CONTRACT T
ýDRAWING/I t26\sSHEET+,REVISION s92UNIT 7V~~ ,?9aQ~ t~&vOo9 R~O
DRAVO) CORPORkATION P.O. # E-287.5
T. V..A. CONTRACT #74 C18-8301 5
W41TM BAR NUCLEAR PLANT.- UNIT #j
ýPIPING SYSTEM Au'F ewA-'Tw.L4~7NZ~-I4 (ip*3)
REFERENCE DWG. 420 IZ1g-2-A C-5sri J
MARK No d3&_fA;W.v'57 NOl REQn
DRAWN CH4K'. APPVD.771)~J~ ' BERGEN-PATERSON PIPESUPPORT CORP. - AA* iT4Zj
0 808T0W. WA5S. 0*00"-MaDGI AM. .E FRANCISCO. CAU HITý GPITTS*IJRGH. PA. 0IHlMP~rSA0,N.Y. 0 NCHADGO.KIL mO 040. -"i4 19t 1.0
-0 38 L A nWG sO3-&A '
8I EI
LOAD:I ! :_ý
F QlGT
(R9005ý VZWOOR RO
FORM 3
WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW
10520DIN510910520. 92. 0000ref: 10520DIN4312
Finding Number / F/ 3/ 5 /9
0-FL
Comments pertinent to finding:
As a result of analysis problem N3-3--5A, 03B-lAFW-R65 "was revised under ECN 3198,revision R902, to void this support on 1/31/83. This corrective action iscomplete.
References: ECN 3198Drawing 03B-lAFW-R65 R902
Program Team Member
OEDC Program Manager
Chairman, ABDC Policy Committee
Daltel?3
Date
Black & Veatch
Classification:
74. aZtm~4d~ ~ s.'e-~~49~A ~ .c4~s-4- ~q~d / ~
Type Category 4I. _4
Blac-k & Veatc SeirRview Team Chairman
Date
Date
I I
10 ii ~Q~I LC.VER s:k:-IE-r SWP i32 0813 500
(BEFORE ISSUANCE OF OPERATING LICENSE)
ECN NO. ' /6TENNE SSEE VALLEY AUTHORITY
DWa'3s 93r NucI--,r Pia~t Cr
To: Construction Project Manager.nSrgCiy TI
0-iet Maaner SWVP 204 CB-'r(
DATE PUfG 1317982
Was U -Analysis Required: Y
~~5tct{~c± ihwi 0 -2_. 12_.
es NoA 17Lk-Ic~:(O{.
Sectioni n Leader
ý7 Released: //o-, - /2Date
Projeý2ngýe9 --- 6esign Project Manager Dt
P r oj , 'E n gi bpeV
Project Wa/S rl4 MC)u ( Affected Unit(s)_ _____
Syte or Featur 31?x (Xi~ 4 revI
Reference & Description of Change r1 Z, A6___4c !rc4k~ ~ y . ' ~~
DRAWINGS OR B/M'S INVOLVED.. 'es JDate Branc~ hra Power Eniern rnhsYes or No
(Data Sheets Required) No Available Appovl Rqure
Thermal Power Engineering Branches
Civil A1,4 ,4' 1-7Electrical
Mechanical
Nuclear
Thermal Power Engineering Des Project
Civil
Electrical
Mech ,02-
Analysis
Arch, Hydro, & Spec Proj Eng & Des
Arch
Civil
Electrical
Mech
NO
Unit~s) 2 ,
CC (Attachments):> <' eChief. Architect~ural OeqIn Branch. W4C 126 C-K
Chief. Civil Engineering Branch. W90J224 C-K
Chief. Civil Engineering & Design Branch, W3C 126 C-K
Chief. Electrical Engineering Branch, WBC126 C-K
~'Chief, Eelctrical Engineering & Design Branch, W20224 C-K
MEDS. 100 UB-K
Yes or No
Required for PSAR or FSAIR _________
Required for Preoperational Test: YefS
If Yes, Test No. TV4 2
Vendor Backcharges Involved At;Seismic Analysis Required tee -
Nonconformance Report Required re_______f__
QA Applies ______
Security System Modified /
Vendor(s) involved: Ye JJýj
Chief, Nuclear Engineer, WlOC 126 C-K -Chief. mechanical Engineering Branch , W7C126 C-
Chief, mechanical Engineering & Design Branch, 102 SPT-I(
Chief, Quality Assurance Branch, W11C126 C-K
'Manager of Construction, E7B24 C-K
Chief, Cost Planning and Control Staff. W12C74 C-K
Plant Superintendent
A/V-LVJ2-
-ILL,
A4
- p -
-AX--- NO lAIII I =-4SZ~.PIPG CLAMP~..
~;1000ZOO R/0 - 1-! - 11"II. c-_ I (DS '3"% 3"XY&/GANiGLfX I~L G
2- - c0 V1 4 6 STUD ALL TNH.
* .4 - 0 1/" AI*I NUTI~ C. s0 4 " X 1/4"t '7" LG. (,I) 5/0e" 40-E,
-7-- 2. 51-2-0 V%274$ CONC-RErTP PAS RtHL EP-IHL I. PS. tru
~ ~ cL t~ ~ O N DEZILET BY ATES P/P/N ANAL YS/S'IIC N~J- o. Oate !DsgOs'wsm c)k~Ikuovf Subml ins
I ~ 4- -- -.C Er-r I so bloc~
~ .C~e,- ~Aa Tb~gT. P~Cd.A~pT' 6 4-7W4Z7-Z04-RoQ-AIboAF-%- iI P id.Aeft- s' 1'A.*
F'T1,, t r .U AL-P - I^kS -1 1 JIT: '71
PlMl bYTVA. DIETOz*_____
H40 OY TVA*,PROJECT
II CONTRACT DESIGN LGD.8DRAWflG#n-bý" 10z SHEET __ _ _ _ _ _
SREVISION92UNIT 14w 4.I'; ___ ____ ____ ___A"-_
~~-3
~ ~ 4POO
1 . ' "( I I
2 1%-;
L .2I,
ELEV LOOKING WEST 1
DRAVO XSO #E-2879-IC-17-2 T.A. CASSaq~ ~ LOCATION PLAN.
DRAVO CORPORATION P.O. *E-2879. BEm - I N-PAhSNttU9 .
T. V. A. CONTRACT 7~4 C 38-413015 *
4~7W4~27-114. 40181219..2m8 AWATTS BAR NUCLEAR, PLANT -UNIT *1-~~'~~~
03-tOVR _*
g'PA P- 3. 1317S
'TEM nUAN. *PART NO. SEDESC RIPrION
(4) 5/,~o- 10LE 5
SEC 770NI A-A
P ROJ EC-- f CONTRAC~Z-
DRLAWINGZ.03 V
SHEET 2,-72 REV._2Z.... UNITLZ-
Z~NIT/AJL 12 _SQ2.= 77;/A R900
sot lueior. 11 , N I Rv4- Ný FCN No. ;Do qn!D ý,T1 Crfl kdcl~uov Eneý Ir maSuhm ý Rec -;
DRAVO CORPORATION p. 0. # E-ý879-
'0 ,RT. V. A. C OD NTRACT # 74 0 8~-8 3G'-
WATTS BAR NUCLEAR PLANT - NT#L
BERGEN-PATERSON PIPE"
-ss~ AUX. FEEDWATE'5REF. PIPING s
DWGS. 47W427-g1-3 ON'~
JOB8 NO. 36 0 4 FAB NO.
MARK &
DWG. NO. 03/AFPY,%SR6
FORM 3
WATTS BAR'NUCLEAR PIAN-TIN~DEPENDENT REVIEW
10520DIN511010520.92.0000ref: 10520DIN4313
Finding Number /F/3 /6 /0/
0-PL
Comments pertinent to finding:
As a result of analysis problem N3-3-5A, 03B-1AFW-R68 was revised under ECN 3198,revision R901, to void this support on 2/28/83. This corrective action iscomplete.
References: EGN 3198Drawing 03B-lAFW-R68 R901
Program Team Member
.OEDC Program Manager
4sy\i~ <_ýý* I'ýýU ýChairman, Q93DC Policy Committee ý
// ateF)
Date
Black & Veatch 4 -4 ,
Classification: type Cat egory 1.?
d1 (f9laz.4& Veatch -Project M~anager
Black & Veac Sei rReiew Team Chairman
Date
12/ A-Date
'4ýwj -? ý'; V -ý / /A, I " V, Ir
TVA 105 75C (i N DES.10-81) -FIt-r--- N!2E i %!G C, tA1 NO [CE'CUV11ER sHE1ET SWPV~ 2 0 813 50 0
(BEFORE ISSUANCE OF OPERATING LICENSE)
3&1
TENNFISSEE VALLEY AUTHORITY CNO
DIVISION OF ENGINEERING DESIGN WaMS 23r NurPiant, Spring City,_TNTo: Construction Project Manager
'From: Desi .gn Project Manager SV 0 3-
DATE AUG~ 13 7982 ij~A Z
Was IJ Analysis Required: Yes N
g2S~eae y ection Seci Leader
/1'Released: Date _ __ __
cT eign Project Manager Dt
Proec 1/// 3/l.CEa-k' Affected Unit(s)________P r oj e ct 3~ ( N , 7 5 • ~ r v
Reference & Description of Change .' 7 L_$6 Av ,g.e'Ag-e- Pe Vd < ye'i 0 Vf"
? ra S1Liec t, If-, c .Iq• c20c4 yIawk We a qC/ýc 12 V
~~~~, ccc /7-' c e *
DRAWINGS OR B/M*S INVOLVED: ' es Date Branc IPw n n e rN
or DaaSet Thermal Power Engineering BranchesYeorN
(Data Sheets Required) No Available AprvlRqie
Thermal Power Engineering Branches
Civil A14A 10 #2-Electrical
Mechanical
Nuclear
Thermal Power Engineering Des Project
Civil
Electrical
Mech zf2.
Analysis
Arch, Hydro, & Spec Proj Eng & Des
Arch
Civil
Electrical
Mech
fpyS cAL WORK MUST BE DONE BEFORE:
Ye 3/JO
IV 0
14L
ýUnlt(s) 2
CC (Attachments):Chief. Architect~ural bEfgnAranch, W4C 126 C-K
Chief. Clvii Engineering Branch. W90224 C-K
Chief, Civil Engineering & Design Branch, W3CJ26 C-K
Chief. Electrical Engineering Branch, w8C126 C-K
IChief. Eelctrical Engineering & Design Branch. W20224 C-K
MEDS. 100 UB-K
Approved:
TPE Civil Br-' Chief Dt
Cnie ate
TPE- Electrii Br. Chief
TPt v'Iechanical r. hie D
Chief Nucle r Engineer Dt
Yes or No
Required for PSAR or FSAR
Required for Preoperationlal Test: ___________
If Yes. Test No. 74 2
Vendor Backcharges Involved NSeismic Analysis Required r.Nonconformance Report Required __________
QA Applies ke
Security System Modified A/16
Vendlor(s) involved: Ake J9
Chief. Nuclear Engineer, w10C126 c-K
Chief. mechanical Engineering Branch. W7c126 c-K 0Chief, Mechanical Engineering & Design Branch. 102 SPT-K
Chief. Quality Assurance Branch, W11IC126 c-K
manager of Construction, E7B24 C-K
Chief, cost Planning and control Staff. W12c74 c-K
Plant superintendent
.. I H0.1 S;ZE . t¶t I ! I .'ZiT..
i__ ___ Y2.' OrONCRL.TE FASTE.NER (PHILLIPS RtDtiEl-,D)_____
___ ~ ~ ~ E; __T. ON S~AT. ZOF L _ _ _ _
:5 t~c- FCR PeM 4, (PerN 70 Pl,.4) ------- ___
5ee 5"T- Z F=09 5Ym(!,L.S
DI.IR1 ECiION: .... Y
2. TYPE~ ..
Y4 DM!GNl LOAD.
____ ____ ____ PROJECT:.~"'. .CO....... NTRACT y
~~ SHEET.. .... .. ..... ~ ~ : N T 4 I REVISION o
UNI
PIE rLE. 0D*1HC2.ý
..._ ___.........___ ___.._ __. ....... '.3 "0 7o :
K~~~. ................ V. .. C.TR C ........RNU LAR LA TU~ 10
.. ... .. .. . .
'I
i'; -~0,
MTON P.o - Auc--h
IlPNC-4 'T~u-;~;2fr-~e%&w k.-, ~ ~. .~-7W4Z7-8-3 . -
RE.-. ~FEREN'CE D6. V -
I~J~ ~Ec~D-
.~r.
I
b~,r*r?$ ~ NUC AR LA*~T ~ ~
FOP-1 3
WALTTS BAR'NUCLEAR ?LAINTIliEPENDENTr RVI!
10520DIN511110520.92.0000ref: 10520DIN4314
Finding Number / F/ 3 /6 /1/
0-PL
Comments pertinent to finding:
As a result of analysis problem N3-3-5A, 03B-lAFW-R72 was revised under ECN 3198,revision R902, to void this support on 2/28/83. This corrective action iscomplete.
References: ECN 3198Drawing 03B-lAFW-R72 R902
Program Team Member
,--_e-Ž9/ II ý x/ m W /ýpOEDC Program Manager
~cLW ~Chairman, OOC Policy Committee
Date
Date
Black & Veatch
Classification: type
10.. -
Black & Veatch Senior Review Team Chairman
Category 4
Date
Date
It / B64ck & Veatch -Project Manager
11.pý
E-A
TVA bollsc r- (N DLF-10-8-1E , ý J O V,1 0UoVE RS:IEE 1 w--3 0813 500
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYSccir-M
ECN NO. 3 ,
DIVISION OF- LNIir'Jt-ClS.E~ Nr- Pinl1* -in CyT
To: Construction Project Manager at pi iy I
-From: Design Project .Manager SV 0 --
DATE A~UG -13 7982
Was IJ Analysis Required: Yes _ No3Lý
Prep'red V ~Section Secti nLeader
V ~Released: SProje&2'ýEng!Jje5 i/ *esiignn Project Manager Date
TSCOPE~ ce- ","nL 20 f
Project /V( Cl 'p- L Affected Unit(s)________
Reference & Description of Change I-1> 2i6eAv 1_4u ' f~e-edg/'-Svt o'
S,~c~i Cc C/g~
DRAWINGS OR B/M'S INVOLVED: /Yes YDate Branchor Data Sheet
(Data Sheets Required) No Available
Thermal Power Engineering Branches
Civil 7/ 4 - Ye- ____
Electrical NlO ______
Mechanical /10 ______
Nuclear _____
Thermal Power Engineering Des Project
Civil /4 _____
Electrical _l_
Mech zZ___
Analysis______
Arch, Hydro, & Spec Proj Eng & Des
Arch _ _0
Civil _ _v
Electrical _____
Mech JK
Unit(s) II I
CC (Attachments): >~~,Chief. Architect~urdi 6egn~ranch, W4CI26 C-KChief. Civil Engineering Branch. W90224 C-KChief, Civil Engineering & Design Branch, W3C126 C-KChief, Electrical Engineering Branch. WBC126 C-K
>Chief. Feictrical Engineering & Design Branch, W20224 C-KMEDS, 100 UB-K
Required for PSAR or FSAR.Required for Preoperational Test:
- if Yes, Test No.
- Vendor Badccharges Involved
- Seismic Analysis Required
Date
Yes or No
Ala
Nonconformance Report Required f'
QA Applies e
Security System Modified A./6
Vendlor(s) involved: ) Jpj
Chief. Nuclear Engineer. WlOC126 C-K -Chief. Mechanical Engineering Branch, W7CI26C-
Chief. Mechanical Encineering & Design Br'anch, 102 SPT-K
Chief. Quality Assurance Branch, W11C126 C-K
Manager of Construction, E7B24 C-K
Chief. Cost Planninlg and control Staff, W12C74 C-K
Plant Superintendent
-ý,(a I ) , "116p-
I-. _T FkAENLk,(hHILLIeStrA~ 12zj cs 4-)/z7." 8" L. w(.r/B3 0HOLES I _
C- 70 -V,' R_ Y ___G_
F7_I -2 00 3-1 1 END ^T_1T/C-Hl*AEHT __
1 VA a9c -e- VDPit_ go
0 'TVA
1 I III I igt-~"7i3I4.. ... .... ..
.. .. .. . ...,. . ..
....... ... 7=7=7..-
. . . ... .. .
DRAVO ISO ~E-2R79-Tc~
C..AM S6 WELý.O Ii
N
- .5 ~PROJECT !''~7N
-~ ? \SIEET:.- - V-'4 REVISIOli.ý,c 9o 2'
.or.rrich,.Chef ~5 ''
I
....... N
E L N NIUC LEARl
17-; T. V. L CLASS-~ LOAT101PLA~N
....
. ... .
.. .... ...
DR.A\O CORPORATIOiN P.O o, E-2879-AA AL"'. FE, Tr
Sm uC~..e ~AL
V8~121~~2~8 -
T. V.A.. CO!:JRACT.':.l,74 38 .83015 FLL.~4>&.
WIATTS BAR NUCLEAR. PLANT- UN1IT~ -_____
o3~A~rR7? LK i.. ~I~F0 6 1 1.7 R -
ISO. 4'7N4Z7- 2_04-F-0JOINT:MiECTION:
SR 00*J
DRAVO ISO PE-2879-IC.c- ý ilw s ýL cw-pL iý` -r-" c?',"' urt-LOH, c --
-r it SN, sp c-ev'r'1111, p IL
VE.4,7. %p,4-r PPa C.LAWkP To 8pM
PROJECT.CONTRACT
DRAWING #SHEET
REVISIONUNIT
ReasonSupersededConcur--
. - i-f3lyf -
SECTION A A
DRA'A) ISO # E- 2 879-IC -17 -2<(, TM~ JRo 9 VE ̂ 247-ZL6 LOAD-
CORPORATION P.O. * E-28 79 ol-jYSI
T. V.A. CONTRACT # 74 C38-83015
';WAT BAR NUCLEAR KlANT -UNIT #1
1 4w
+~
,**.'a r
AUX. FMEWATER
MARS NO. O~B-~AFW-P~7Z NO.I -
BIRGEN.PATERSOI4 FIPESUPPORT -CORP...-
t 77 774 7w.u.Id S Il, '1S 0bl
DRAVOI
-%-I zsr+40'-ý5)s
FoRM 3
WATTS BAR'NUCLEAR ?LAN'TINDEPENDENT REV=EW
10520DIN511210520.92.0000ref: 10520DIN4315
Finding Number /fF1/3 /6 /2/
0-PL
Coimments pertinent to finding:
As a result of analysis problem N3-3-5A, 03B-lAFW-R74 was revised under ECN 3198,revision R902, to void this support on 1/31/83. This corrective action iscomplete.
References: ECN 3198Drawing 03B-lAFW-R74 R902
Program Team Member
OEDCPoga Manager
Chairman, OEDd"Olicy Committee ~
/l ~ '
Date
Date
7A- 0- ,/rv~ ~ Z4Black & Veatch /.~ ~ 4qd4~.'4...
Classification: type Category 0'
Black & Veatch SeirRview Team Chairman
Dat
Date
TV 07C ENOS 10-81) f ~((A -1C)~ NO [ICECoVERSHh SWP fij 0813 500
(BEFORE ISSUANCE OF OPERATING L-ICENSE)
ECN NO.TENNESSEE VALLEY AUl HORITY
DlIVlISION OF ENGINEERING DESIGN
To: Construction .Project Manager \Va~s Bar NuJiý.iu. Pia~nt, Spr~nq City, TN
SWVP 204 G31-iFrom: Desigin Project Manager _______________________________________________
DATE AUG13 1982
Was IJ Analysis Required: Y
7 ~-~i-i
2242as Nof
-Section Secti~n Leader
ZReleased: Date~1-~~esign Project Manager Dt
SCOPE /,ht 9* PAKA6 3 '(AA/cte Unit(s) ii2-
Project Affected'c/ai-
Syst) orY Feaur jg7,5%- - irv
Reference & Description of Change_ 1-nk Z17 Y ,4vx ptcig/~ S . ,li'e / VCi.- ypk/5 elp~ .41!L7
(1deaL,1j 74 .6 S,9 e f*'-14 C,./e
DRAWINGS OR B/M-S INVOLVED: Yes Jor
(Data Sheets Required) No
Thermal Power Engineering Branches
Civil A/Aý 7'- e-Electrical NO
Mechanical it10
Nuclear V
Thermal Power Engineering Des Project
Civil/a
ElectricalAl
Mach 0 2
Analysis
Arch, Hydro, & Spec Proj Eng & Des
Arch JICivil A
Electrical iLMech
PW{SJCALWORK MUST BE DONE BEO :
Pre-Op 1t Fuel 1TenCm'Test Load oerOper'fl Re
Unit~s)
CC (Attachments):chief. Architectural 6e9)gnraflch. W4C126 C-KChief, Clvii Engineering Branch, W90224 C-KChief, Civil Engineering & Design Branch. W3C126 c-Chief, Electrical Engineering Branch. WBC126 C-K
>Chief, Ecictrical Engineering & Design Branch, W2022MEDS. 100 UB-K
Date Brancl-P -'511"/ ' -' ri f 4-A. UOl 4Set Thermal Power Engineering Branches Yes or No
Dvatlabl Approval Required
ECN is r )r3~ nch review:
Des~rn Project Man er Da~te
Approved:
DateTPE Civil Br Chief
TPE Electrita Br. Chief
-r0 iTP-r~echarncal Br.ChiaeO7 y' Da
Chief NucleirEng ineer Dt
,Yes or NoRequired for PSAR or FSAR 5
Required for Preoperatioinal Test: W5
if Yes, Test No. TV4 22of?Vendor Backcharges Involved NOa
Seismic Analysis Required ____________
Nonconformance Report Required ref
QA Applies 1`-J
Security System Modified A/6_________
Vendlor(s) involved: P~~OW
Chief. Nuclear Engineer, WIOC126 C-KChief. Mechanical Engineering Branch. W7CI26 C-K
Chlef., Mechanical Engineering & Design Branch. 102 SPT-K
Chief, Quality Assurance Branch, WlIC126 C-KManaaer Of Construction, E7B24 C-KChief. Cost Planning and Control Staff, W12C74 c-KPlant Superintendent
1~ 9 I s0 11AA~ . r
_A EUIb ATTAcmHAo ______Ul
-r --
42 42 -_q ýN A NRkLLIP'b RZDHlEAk0J _
4a-
.'s
I Q
Zi -p
is t. '.
-4-- -
4- -- I
-II - I -- - I -~
DRMV CQAPORtKrQN: P;. *ý E.M89..
T. V.AJkCQ~rRAT,*74S8O C.r
WAMT MAR JCLA r7 .N 1 .1r 75. flm &7Mbý.
A&'i- iaýFA,.
WNW- AI..~~A ~ . ~ .~Y ay
MUM 4
S I I~Z 9O2
i
W* .,PPlL C.L.m A b~C%sCA60sL It 61( TvkP - -7 .0+
LNýJ ZCN No. care ý C ri ' . )k ... E'rl X'RemA IW A
EL.~ 02-
)04
-CONTRACTODRAWING# 0' Sign Pro C nogý
2-ZBranch Chief IF .4L
'100 PIPE SIZ.EW. 1
7VA R5god .!"004 A~/ - :AZI¶A -A~
ARAVO ISO #E-2879-.IC-17-2 T..4 LS-*ICA)?AM AY
. V ."-, . - . - - - - . -III .
D&S.CRIPTIO#4
AS~ Y2!' 0 X NUýý.GPI -6XTE
S c..s Y4'__ _ - -~
2. C.S 3 ~Y+ ~s 4~ A~ SOWN) __
_ __ _ _ _ _ _ _ _ _ _ _ _
As5.,/
A -_----a.
OKI I"
4ooo
'ki
I
d
TV,? f*9OOX VF MOCOR g/
DRAVO CORPORATION P.O. * E-2879-
c A CONTRACT *74C384L3015
"INVtTS BAR NUCLEAR PL.ANT.- UNIT I
o~; aEG N ! 1 IQ woo;- a" P1O ;41311
WITW FplKO SO4UTH4 S~WiF '2sLaT
SSHEETC 8.??,5
EK CI
4.
Branc CJi
PROJECT.,CONtAC. 152
SHEET a - k
REViSTol 92UN IT \
T.V. A.. lAWLA Ia LoaDL Z
"ExK NO. 03M-1AF 4 -- --.- ,
:ps'R*. XPC O4lliwi14 (l-ZFW zO7 Ro
I~.IfU.t! I ~ I
PART SIZE
-1+-t--
-I t I II I
7kw9*%Q33-iAFW-R0'74 -90Z
- I 1 .1 1
VOT
-vo
FORM 3 10520DIN515310520 .92.0000ref: 10520DIN4081
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number 1,c/.T/ 13/
Comments pertinent to finding:
At the Black and Veatch inspection, construction of hanger number_________
was not complete. The hanger was being tracked as incomplete by the construction
accountability program. Installation of the hanger has now been completed in
accordance with the existing Quality Assurance Program and tracked with the site
accountability program. Attached is a copy of any additional field change requests,
Quality Assurance inspection documentation, and accountability print out.
OEDC Program Manager
armnan, OEDC aicy Committee
Date
/ ate
Black & Veatch ~ O ~ ~ ~ ~ ~ ~ 6ad.#4~~~e
Classification: type ,Category 04
Black & Vea tch Senior Review Team Chairman
/ZZ /0Date
Date
N
/0-N
U frf
A49eTWAM
RRI? -
B ~ ~ J9 * N/INi(ýU' IC 26
AI TvA;/ PIPE 21w$
PLANANYO'
-ON 47A42 7-3-3
47AW4 -3 -34
SEC T/A4A-A Al07 To sc4LE
2 PLA7,iE x3pxQ3 esH- AT Z540, 35 jwýýý
MVffwzoP-p-:Z!6x * ST'
ITEm QTy mArERIL4L DESCRIPTIN FOR ONE SUPPORT21SISEISMIC CU~rEGEGOR I STRUCTUFES;
M&VC A CRHZ'9 (4 O IS swP 830413 3&/) MEHNIA UNTJfl SEISNC CAT I SUPOIRT FOR AFW
39.iidg CALC MWDS SWP 530413351 9JPPRT DETAIL .3-5'
TVE VALLE AU
------ ----
LOP
ENGINEERING EVALUATIONQCI 18
1NDENT__ 103Czý-ý
PROC/R:E-COP,7L)--'' . -
CURP114 PROC-ý -2 9' 2-fTEST NO. ____ MzEVALUATION 1 "101 7- 7C4- qI
FCei W-/02 9?5 9 r.Ar?,C
j! o~rner pourentallon meects thte currentWBNP-QCP requiremnents. H+
Engineer- AA
Date /'~
2.'
(.ilw-QCP-4.23-8 Tmsrj1o. 8Attachmut A (LAP)
SUPPORT in
.nerenz-. 1h avig
Acceptd
Un ique 1det i fer
;1 br it-tion
InstalLation _______
Cape V4 A4L 14
Stainless Pipe Prvtect-i.-u _A.4.l~
Gro tAM
inte~gral Attschvmezts .lpsulation S~addle~ or W-~ S9
Stainless Pipe Cleznlin~ssL
Bolted Cwxnecticuue
Cotter Pin*.,
7, of QCP-4.23--8
rOJ £140 TRACIC144
7 W.4:; waroas FULL-41LE PSTE4 aAaf IAN&..O Ult) ~'gee*~O~lSgUO~4NS** ****.4e**g* S..K resole~re PARING01 *.ae**eEaeea.eV~~e Ut.....4.*... .w*.*....$e
1003-A427'3.i *IOO3-.2 1'-41Q41.41-01 HE 'ttoLA ctdw t s1 ' 11102 3!-2'3-- 1-41ldO 1-2Oi Car) 111171~3I.z" q I 'In il U34, ' Vamp 41I4 VIGAl
LJ-273l1003-1 1-4 7 W42 7-201 EIOb M-11612 4i Hr 1A' ii I* Oi OI~CAFI ý1500~
9k003. ý7A42t, 'N 46 9 2 ( i0
14 4' 1. GS$,J . Olt'
a cc 3-A.2i'-7-.3 5, .as 1-4t1W427-42~ 000 H-V'eaa we1 QiAw 0 cii. I *A 9604,600O
.01140 CI.
I LCu3l-A4J27rA44.. . .j. . d ~Ii 1A1W4271.UL 000 0*-9881 I HA 014 GAlp ials at4 94A 944*AO n
In, :: i-741W411-22 I Maf Me94 Ot A* a2k.4 03JO#ýA 6018? 66
040 1.84 Mil OIA -04A 9,4 06047:.9593 - 1-14 a 1-- - -- H WM 020, 44 bU-8+ -
... ..... 9~3 241~i-~- uw ~tni5 il~a4 uy j-wo
CP H"81 01 A o*. 'a1S'. oiihi :A* 06 10 470 4 OOA
* -.1
9
061 k-gsiq
FORM 3 10520DIN521910520,92.0000ref: 10520DIN4316
WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number /F-1 /1,,¼-
Comments pertinent to finding:
At the Black and Veatch inspection, construction of hanger number C)-ci-.' *7.
was not complete. The hanger was being tracked as incomplete by the construction
accountability program. Installation of the hanger has now been completed in
accordance with the existing Quality Assurance Program and tracked with the siteaccountability program. Attached is a copy of any additional field change requests,
Quality Assurance inspection documentation, and accountability print out.
The print-out is a Quality Assurance document and will be retained as life of
plant documentation.
~Q ~Y\c~Program Teaklý4ei
OEDC Program manager
ChairmadIA OEDC Pblicy-Commitc
Date
Date
B lack & Veat ch ft, .l.y ... 4,~-c.~
Classification: Type R9 Category
v6 la~l & Veatch Projec-t Manager
I? R .F , v a aBlack & Veatch Senior Review Team Chairman
h&Date
Date
(ý- -R )v C 'n"."Je
-M-ý or",_ (1--A
379
* Al
fX /.ST ,A.f) ".-l- LOCATION PLAN,-44725 1,1eo2J so-e- ATION_7 -0"
.004 AT)TS BAR
.OF CONS-4 X/S7.4-m~a #1
Z-c'' 7)POJCmCOINTRACT701VN -AlDRAWING# Z
/'L4A/ V rwrsuok-7 t S6C7r/O/V 4 -,4
104Dr BL 7B427-500 RO FE * -6
J-4
- - -.. - ,. -''A ,,e.tA..,9 ~I
SERVICE-AUX/1Ae RJ F-~.,*vr- ___________
AREA: / CJ TVA NUC. CLASS: S
MIrnf.~GH L (Mo~CEI tss. MomtmTsI: FT..LDsi REV OAIquopoqFTE" ENG IEN
F MR EDSNUCLEAR INC.FANY. SHOWN ON DETAIL 1 TIFESrEE VALLEY AUTHORITY
_ WATTS BAR NUCLEAR PLANT
map6.OG UN4IT NO.LIU3 P40._ _ MARK 14..
E
U-- - ~ ~-
% t
NOTES:
2.) APPLY mOLYKOTE 321 TOALL SLIDING SURFACES
3.) FMASYI4OL DEFINITIONS.SEE 47AiO50 DRAWING SEF
LOn 0094-TVA 7/73
EDS NUCLEAR INC.SAN FRANCISCO. CALIFORN4IA
I TEPMESEf VALLEY AUTHORITYI WATTS BAR NUCLEAR PLANT
?I UN4IT NO0. 1
-Rt V/51o~v~s 46v VA-
¶T'r"tI.ýF.E VALLIPY A1rr))'RT "'YL~W(~~ 1
VT~rt') (4RAMM, VI~QT1!.% Attachmen~t A
RP.PLY M41.wnRAN0!'TyK-I L
TO :J. C. Standiilfer. Sequoyah and Watts Bar Design Projects Manager, 204 GB-K (3)
n~,I Guenter Wadewitz, Project Manager, Watts Bar Nuclear Plant CONS"I
WD, 83 0506 319Attentiqn! -/ J- -A/ASI '14 9 17)ES e5N
IROIfor rban~e: 45t~tuq Pnint:
r~rawinv! ni~crenancy Vrieor to 17tiel T,na~inot tyor1k PRcI'RFe Nn. 13E
7;ý. i'l:AtpAfte, Fuel TLondini huzt nrior
ý:anstr'ction to Closing. rA~italizeri Accounts
A~eiti-cral flpsip-n __After r'iosing rnpitnlized
Information Accounts for th~e Vntire Plant
r~ocur'ents Affectee 1- 0-:18-7-3 18903)
ý'irked docum~ents requiired and at~tached Yes 0~~
rlcnrnpr.: c-P"imion-'~¼-Ž Yes '
-Ld4A HCA E -2- CtLFAp D FMIcrNS10 1-MiLF
S-PECIFY 01N ORAOWk,Iic "CUA/RAL NOTE 1. 38~ 0,V 'qAq050-IC R6' DO-Ej AI4T"7 ,4PPL
Al WIMPD am4 c4s om sirsAoproval o6,taine$ I~v: TelepI'one ",ero Cy l t' t'e r
NooroveAi for tran~smittal to !".I T)ýq e~l, 6v
--------------------------------- ---------------------------- - ----------------
EC o ate Tssutl~____________..-
Claianie Complete '-- --- (EN flFR Enxinear) (rIesi,
Original Return to C&;Y.RT by rN "R~
Copy 3 -Retained by CGTST tintil oritinal in returnetiCopy 2. Retaine4 hv EV RC~opy I -rsnq
Xn Proiect mxnsf~er'
c-c-*: HANGER INSPEC-TJOM
II
-~ to -J a~
- -J to* i' to to -J to
:~ : z-~ - to -" a.
tO - -. a,to to -J to
~'2to to -4 0'U~ to -4 0*~
in to - to
eiO to - to- .~d -.~ a,- to - to
"'to iC~ - to
'2to to -. 4 to'2CO to -A to~.in to, -. to
~A n to -4 to
'2 in to -. 4 to~to to .-.. to
'2to ci -J a,ato to -, to~to to -4 to
'2to Cl -J to'2CC' to -~ 0'
.2 in to --4 toM to to -4 to
2 in to -J to'2in to '4 to
to to -A to
£~to to .- " to00 ~-A
'~. .~,A ,~i~I 9?
to ~- ~wto to *~4
!hin to*~ ~ 'to'2in to ~ to
'2in C.. -~ to(a to -J to
~in to -4 to
U to ~'4 to
'4, .- ' -. 4 to)~to to 4 09
t- to to '-.4 0)5in .n -J a,.
~to to. -4
to .4 to~to to 'to.2to to toSin to to"in to
.. ,tO to 0~~to toain to a to~in 04 to
'in to to
to toc~(in to
tO CO -4 0')
a in to -4.2to to5in to to
A. Cr.,
- a to
- a to
- V
-'20
- ~ to
- ~ to
-2-'20
-'20
-'20
to '20
to ~ to
to 00
- ., to
- toOtto
to -. 0
to .40
to ~ toto 20
to '20
~~0
-~to
-2 to- to I- to- I
Grouta ~vf~Integral Attac.ýni~Lis .d-4.
Insulation Sajý!1e or
Stainlesa Pipe Ceil'c~_
Bolted Connections
Cotter Pins ~ ~Remarks:
Inspec td fn ccrdanc ith--Rev of QCP-4.23-S
Inanector Dote
WB"6-QCP-6 .23-8 TEST 110. aAttachment A (LOP)
SUPPORT FINAL IN4SPECTION
SUPPORT ID
Raference DrawMin
(cneck)Unique Ident.ifer
Fabrication~
Installation
Caps y5 ' 1
Stainless Lripe P~~
/..'
~: DATE a 115 g3 REPOT, fj42kANCER.._ F(RI ftIqfON. AtND FRAC KING__YIE PACE 78PEO7 ULL-FILE BY SYSTEMs HANGER 10 ICBEAK 0ON& SYSTt94)> 003
ORAIWIG.__ - V~SCR phbo~j _ ____ STAT T E.ST A L.SI U N I E
1033B-1-038-62 X003-2 -7i2-1 0 8MM01 4.01 ~ ~1O3--Xa6 003-2 1-47W427-219 903 *HM 03A* 04A- Ol~s _Ceo.S100 30- 1-G 36-64 X003-2 ..- 42i.0 AiM3 __A___
-190O38-1-038 65 $003-2 1-47A18219 2I 4~.*IP 3' ~tQI C. S10338-1-036-66 X003-2 1-411h427-219 904. HM 038* Q OtIS 07 C. 091* _______
S10038-1-038-67 X003-2___ -1OH'2-zi gN0303-1-038-68 _X003-2 1::47i4 121.ZL9 -9 _ Mk40A*01 S80+ A*/I4 *_/ Mi 03A4 04Ai 0700 CSC* 091*_-uh 1-3561X93z1-H/C2721
k 1C038- 1-03B -- 7 003-2 1-4Th'.27-210 903 4-Q~l HM9 03A* 04A# 07A0 CBS* 091.100.ýiB-1-038-7 T 1-47W427?-21 9 901 VI O01I-10381-38X OO 3
-jj-.'.7bd421-?19 HK103 4 MN 2 -4 W OIA* 0ýA4!~ CA *~A* oar. 09 _-29901 VOID NO HOR* _041*,C
110038-103 8-: RS 1-47W421-219 901 4CI HC 084*
1 0038-1--030-?? 1 -47W421-219 S0 .-got *vl HO Oi9A*30032# J-i:4Z-21 .? 9Q0iLj ..I HO91 08A*0A 144A T*031038L-3-p 10321-47W427-21 9 903 *HE 0114 02A* 03A4 0'.AO _5*08 A
IC030-1-03g-a~~~* X003-28 62______g4H i32ki SO S,A~n -0/1491-H/c____IC038-1--zo H9H.O I99101* 02A0 03J4._C4A*_O61* 08*4* 0081-3-a 003-2 9523 1-47W421-219 903 91-9700 H 9K 0311. '72A* 0304 C4A4 07A. 08434 -
100s--0a-3X003-2 1-41a.427-21q 902 HM19 03A# 04A*.OA 0 -4Coat091
3- 19-9 / C2 0014 .- " ZQ QSQ*20038-2 038-11 ZO0S-00 J(03803 2-4 IW42 7-218 03 MM9 03A 04A 011 CSA
ZO3~0~oO -4w12-ZgC3 HM9 03A 04A 07A 0OA203--08L 003-00 JC03803 2-471*427-218 399 3 4 1 83-,3flu~ia 03_ HM_ 0lH3hA 0A 014 C8fA____38- 2-030- 11 90037-00: (0b3803 2-47W427-21 4
Am ., 5. 14 she 03 HM1 03A 04Ani. .A*
FORM~ 3
WATTS BAR'NUCLZA.R PLA-NTINDEPENDENT REVIEW
10520DIN522010520. 92.0000ref: 10520DIN4331
Finding Number / Fl/ 3 / 6/
C
Comments pertinent to finding:
Per disposition of NCR WBNSWP8272, support 03B-lAFW--R221 R904 was revisedunder ECN 3511 on 4/8/83. All corrective action for drawing changes iscomplete. The documentation for closure of NCR W.BNSWP8272 will be complete-by 11/30/83;
Ref erences: ECN 351103B-lAFW-R221 R904NCR WBNSWP8272
Program Team Member
COEDC Program Manager
Chairman, 0BVC Policy Committeej-
/( f7/9 3Date
11 7A &)"Date
Date
Black & Veatch 7A4. &, P--emoit
Classification: type
IV~ta 1 Veatch-Project Manager
kR~~~
Category 4
Date
Date
:583
Black & Veatch Senior Review Team Chairman
I %
ENGINEERING CHANGE NOTICECOVER SHEET SwP 13 0314 50~
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITY ENN.31
DIVISION OF ENGINEERING DESIGN WaitsBrNce Plant, Spring City, hIA
To: Construction Project Manager
From. Design Project Manager SP24G-
DATE MAR 141983 .2~e /1v.i
t-I I Anz~vsis Reoulred: Yes - No
Project L ,VAffected Unit(s) -
System or Feature Lui 41Sm0 S NCR 1z M e
Reference & Description of Change 'Exea R Ft ref
V-4qrcwl, /~,'~Arj'VE ~AM. 2- NO- 82, /006 ZZO MOW#4C 1
DRAWINGS OR B/M'S INVOLVED: Yes Date Branch NIERSsuoTsucNYe
(Data Sheets Required) No Available Approval Required
ENGINEERING SUPPORT BRANCHIES
Civil.ElectricalMechanical
Nuclear
NUCLEAR PROJECTS DE31GN GROUPS
Civil
Electrical 4Mech 2
FOsSIL, USD80 A SPECIAL PROJECTS.K216lS
SPECIAL DESIGN PROJECTS-
ARCHITECTURAL SUPPORT 8@AAGU
Fww~S-CAL WORK MUST 13E O)ONE BEFORE:
_)0_NoWC,No
JE-5jk'ts_Az_
IutniI I I I I
CC (A~ttcnmv-ti. 460 - yes (S)
CHIEF, ARCHIITECTURAL SPOTNAsC.WCS - CHIEF.
CIIIEP C CAL ENINEEING RRANC. PU9D2: C2 6 C- 9 ANG
C"UIEF INECIIANICAL ENGINEERINE I ACII WMCID OL RDS!
C"EF. NUCLEA E NGINEER. WITCC126 C-OND ICHIEIF. QUALITY ASSURANCE R OAICI. 310 I-
Required for PSAR or FSAR bU`hq'6Required for Preoperationlal Test: 0 --
If Yes, Test No.
Vendor Backcharges Involved
Seismic Analysis Required ENonconformance Report Required _5__&
QA AppliesA3Security System Modified N0
Vendor(s) involved. biJn
COST PLANNING AND CONTROL STAFF, WtICT4 C-9SPECIAL DE I GO PROJECTS, W2D220 -
it OF CONSTRIUCTION. E70211 C-NNOPE RimR ruOUTWIN, CE
- ,-.,
~~$ 7 59k 5,0- T_4 IA.'& -3
JOINT.
mr pswz a 881ADRETOT.6.dl V.A aTynIE27-C-61LCII9 LN-
-~N _ j LJKAVo __ _ _ _ _ _ _ _ _ _ _N__ _ _ _ _ _ _ _ _
DRAVO CORPORATION P.04 * E-2.l BRU.PTRONPU5WR %~
T-,ý CONTRAC' 174C38-833O15 IV. Pun
SWATTrS BAR NUCLEAR PLANT - UNIT*rI
=4 -fV4 900 - VENDOR, Ro 9wmDA1-,: O30 i. 4;NpIZa f.a I 904
I -~. I...'r -4
Not %
4'j N
a wuý
AL
MI MY tSo.2 2', 9' .-
- f 16 SPLEZA -3 )4i. - -
7 S. z~lt - ex 1 - - - -s"
DIVISION OF ENGINEERING DESIGNNONCONFORIMTANCE REPORT .swV1P
MiEDS Accession No. f83 0 110 12 5
El REPORT NO. W3N-S1%8272
I r~7: UNIT 1Watts Ear Nuclear Plant
PFE-=A.==R/ORGAýýZATION/DAT-r J.. R. liollowa-v/SW-?/7anuarv 10. 1983'57 DESC='TION OF CONDITION
Suppcrt 03B-1AFW-R221. Rev 903 was not designed to thle specified requirements of supportloadS- table 47B427-469 RO. The suD-.crt should be allowed to move thermally in the Xand Z directions and be restrained in t~he Y direction. However, the support is restrainedby a n--bolt in the X and Y directions and will not allow the required movement. Thisdeficiency was identified during Black and Veatch review on finding F365.
_nA7TEFOCCU~REN-'CEEST(X).ACT.( 1 4/21/827. 7ZOF DISCOVER Y Black-and Veatch Review
J -WDE (EN DES-EP 8.01) W'~A
CM,. .. ECTIVE ACTION:
12 SIGNIFICANT CONDITION! ADVERSE TO QUALITYYES _17 %NOD
I , 1 BRANCH C E DATESJ__/
A C T. > D E IA7 E S ýF:RO 1 'A D ESI G % C.-1T E P: , ~E C'-''.EN T ySES 0-
CRITERi4- :'Z)CUMEN7~ *.Z XC=5-:71ON R.EQCUEST NO.
. , -I ' Z.SC EDI-LE rf.'PACT
21I PLAN.-
J5Zc5
NONCONFORMANCE RE-PORTW7 REPOR7 NO,. 17
AS Vi_:ASLE CAUSE: (REQUIRED IF SIGNIFICANT)
E-7THIS IS A GENERIC CONDITION YES 0 NO0
ACT!ON REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
'I%::'PENDENT REVIEW:
LA LZ3= EST. ( ).ACT.( MH 2 SCHEDULE EST. II ACT.I
'--VT NO. _ T2TAKDESCRIPTION 24DATE INITIATED
F.E,.'A .R KS:
LE OITIUTION:E6ALENDSATOCMPT:C--STPROJECT f0,NAGER J. R. Hollowa'y, 3109 GB-K 21ALNDSCINOPEEE'. DES PROJECT MANAGER'... F. ESS
C =CE OF CIA_ __ _ _ __ _ _ __ _ _ _
N'ýifor Significant NCRs) 'RNHCH FOGI. CI 7S cisNHCHE/OG
% S= Ifor Significant NCRs)A'--zSTANT TO THE MAN4AGER OF OEDC (Quality
.: ~ ~ n~ ca N C~ sMEDS ACCESSION N O .
FORM 3 10520DIN515410520.92.0000ref: 10520DIN4317
WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number //3~ 4
Comments pertinent to finding:
At the Black and Veatch inspection, construction of hanger number________
was not complete. The hanger was being tracked as incomplete by the construction
accountability program. Installation of the hanger has now been completed in
accordance with the existing Quality Assurance Program and tracked with the site
accountability program. Attached is a copy of any additional field change requests,
Quality Assurance inspection documentation, and accountability print out.
Program Team Membt XJ
OED~f-rogram Manager
Chayan,- OEDC P~!9 Committee
I Da e
Date
Date
Black & Veat ch
SA- 7.T57 4...
Classification: Type ___________ Category 4
alaA& Vatc ProectMangerDate
Black & Veatch Senior Review Team ChairmanI aef
c., mizv,
5 VA D"I 4-? fw~'~-' 1; pt
N (hZFO3B-IAf#- 9" NMAX)
IN-
LA.
fAUCLCARTr v. A. CL~ASS
I -
flDA~TA TQA P.9Q7O..TC...~.
-r
~0
5m
PAN CNETS
/9d
~sR 9
*INFORMATION ONLY
7~P LOAD-
TziIL~A -4
LOCATION PLAN
C)RAVORA CROgON p 0. ir &29-ý9.
T. V. A. CONTRACT- # -74C 32-%W1i5
WATTS eAR NUCLEA12k PLANT, MIT w
BERGEN-PATERSON PIPESUPPORT CORP.
SYTU AUX. FEEDWATERREF. PIPINGDWGS. 4I7W427-3-10 '48NI210-7-3
Joe No. .304-F7AD NO.009 19;4iMARK &£a
DvQoIEt-/AFW-9921 1.11S -l o~ !a "-%L- - -I _________ _______Rd
FORM ~ W75 -
fjzt
f4ot
041 ac~I c~
2p EP :mtw SP 5m7 1S DATE,.?.7
nDA17n TCn r-1970 Tr-ir,
nsM uA4m. NIRT 14O. SIZE DESCRIMION WGIT.
4 2M rZraZxV4`xLGAS REGO____5. .L TS ' *Z*'s xIG AS REQ0 Y~
I- SVE its 17)~. _ _
FCRMBe-2.1o175 -- _____________________________________________________
~.- I - f - Y ft.easantIEbI ~T.C
tITSM OUAM.PARTNO SE. .. aa..AZr~r~r N~;1 31L3 -- s.--. I- -I-1 ~ 'K-3 N pAAM& ____
9i L TS 6E'z f 0z S ASWLVXD/3 T S 3-,3z*,1 ~GASAff~___ - __
12 12..3. - Adul 1jj 04~
ITEM OF 771 mi A#M~MVI. IN AE fA IL/S 40 BE
hC#UT, OF 'fFOWI OFF 03 m Sx
,fl 75fliOj~
TrP> i--
SEE NOMF I
la tw2. na WA6 -
M-86 C.4LC, WEDS SWP 83 0103 04/
[Rev piJ,-R C'H'-889 ,4im c ac no I 1
£LE/A76'CA-AT$o V.A-TLOS ~t~
DRAVO ISO E-2879-IC-16-1
X DRAVO CoRp0R.A~r'ON p.0. ;tE-2379, BERGEN-PATERSON PIPESUPPORT CORP.A. ~ ~ ~ ~ ~ y emTATtlCi101 ~ AWI. FEEDWATER
10 V. A.CNRC 7 9105REF. -, P4PNG STRUCTURAL
"q~TS OAR4 NUC LEAR PLANT -UNIT #~ I WI tJWF7Z~1 1INo- O~JOB NO. 3(, 0+- NO.NV0 ~
_____________________________ MARK sm ; SH EET lV
L.LL~~ ~ ~ SI)~5a-1 ATEI-3I--7,0 OwG.o. No.RZ ~ kim!0
ITA R 0 X4Wae 0~~
a.
-4J
Iff1wrl MM&Y f, t+jl ALJL_ý-Ull ApIllso
*a~cmai~o.
ZZ :747'114"
FELYAT/ON0B INFORMATION
ja4
T. V.A, CONTPUNCT *74 C38-MIS 5
"o'"VATTS WA NUCL-EAR KAMT - UNIT #1
PROJE CTLWY&CONTRACT '74C3-8S0/.DRAWING 035-IAEW-fl2-x5SHEET-3jQEI.TJREV 90-4 UNI1Z......
TVA QBA -a V"fAi A b
aEptaENCE
I~i a aE
SERGEN-PATERSON PIPESUPPORT CORP.0 "T om.";aa. 0 we*&iqsu. mi. a0 SmpuAisqc.04. CAP.&*
0""Savoo,.e.PA. aftems"Se.MW.V C~ L
PIPING svill'"Al-m-
T I 0ý'TSUPPLEMENTAL DOCUMENTATION
WBI,,P-QCP-4.23-8 T---T NO. 8
Attachment A (LOP)
SUPPORT FINAL !NSPECTICM
Support ID
112031. 03B- JRW\~- R225Reference Drawing
A.-copted(Check)
Uniqueo Identifier
Fabrication NA~InstallationMA
Top Bottom Lateral
Gaps WA -K - M fStainless Pipe Protection
Grout
Integral Attachments
Insulotion-Saddlec or Lugs
Stainless Pipe Cleanline~s
Bolted Connections
Cotter Pins
Remarks:1i e I-~f~ L per
WuR 6Inspected in accordance with
perr/-2 8
urn II
* Lub~GU-~A tauI 3S-3 7-XL Ijt; Ua 3 L Ar 6- , L 9 L
*uuju .t i.9 ikVO
I OU 30- U LI. IA F.i- kLiv
hsiujý!
.mt.1 k l,
p 4j~
1 417W42 1 f~T
.I .. " V c-;. 7
19JJ.~ *,. I 9t~'4 1.I !
't.l
9 HI: 9J14V QUO koso%. 04JAI *'Vb* lt:o
. HAM ULA- ~UIY'A*95 j.vC.J') 4 HA OjkC*
o HA 11A-~ '24* f)3i4 C14,.' .).:A-
4I -. ':.I~ 44';'-D * I l" ) 1)1 4
ll9.' L 4 J4. .t ,5. I "--
4 hA I!A 3. 2A- )3A4 't440 'HIt1 1Q-III IV1.~ . t.- 13111 M~~ - l'iTF
1aU38-Jju-iA#'h-%L~u X-hI.2- " -- 47W421~ -ý'o I . HIA OlAA' ]2A' 1)3j* C34A* Itflj,-
JW .A A,9tV UVJ d v ~~ iy 1 !W',F g-ic r ,,. t M -11 1.'A4- 1.I4A 7.: 0 'I,, - t,;Uj j V**'1Ga-1I-s X.*GI-Z 1-47W421-106 M A O1A* 02A* .034 OA- nJfi-
LU Jb LtAI..'i..I.J 1J lIt I --i; r~. 9 do' 2." 1 -. :: .jsý -, -'p L~ I I IA L
R-4 01 3,33 I q IN 2 1. U( ev IT:. r-4 Ft,:),' Ir 4r FlU 1).' I4 -IgA 0 tU 0404 ~1.OU3L--J.As- -~w-i 4i~1- 11,14 2 1 -OI 90L ti -F f!* 6A GIAO CZAO 0350 04A9 ae
I~j3 0,J ,Qt 1 A #1,4. Ch A Xo' . I-,1h'.21-Z0. Ut0 H-,I7h 47;ý* C~A* 1.A* 08*4 OVAOM. 3b-uju- LAp h- .t.U WI AJUJ Z 'UdIL ),; I~. tS I ll -0FINQ I79 VA -t' lar 111'Ti 9 r 94 JNl
.~~~~c: HA 1) 1.'i2 A VC. 4'ý.1.9... .~9*jl.'**~ .. JIJ..J. - 'S 1~ . J i.9* 4 1-~ -1, L~'A ',S
% /,Qti LLI..Jj,. J.9a L-11 04CJ. J.) I iYLl!IT IS7-.. .-lt ;.' P 91'IA14 tl' .. L!ý 9 . .' "
TTiT3E~ ~4. iU~I36 XJ 1AC.s~41tj* I~YJ31..*flTh-rmi~-~L.a~
* L-.....tt*'.x:i, :Ar~,-~a.~
i*J):9:. 'j..,. L.Lr-9 99 .j.*.* ljL..JW~T~T~7*~ZiW
/21H It/C
I Am1W421-?i)2 OM I, bru
A jj-L1-4 7f4%2 !-.'J L "V.-
122H~
uw u
AJtOI C
1 's1w421-NC4
I-41t,42 1 - !Q) NI7.7l
4 641'. Z .
'~1 *' i,
',r.
* #4 VA &1SU.1Aq 1414A.- U-1AW 4'ý4vHO OCl~Al 2'$* M-1' (19A"H VA 0 1.2 0 ,2 - u I .4 11,4 WqC-r.-ý
2I-~
* FC .A, 12(A^~ 'alc '4Al , .1i' ý4!
L!)iJ.t.*. Q 'J t16 IAI , - %L i9.,9.,-L -. 4 i~l'. -70.U 10. T ~ 999 11 11L ji..- " -9." - ~- I .- )4 99' 7 9I-9.
V jI -ý,J,,_IAfr.._,., )J... V's7k'.1 ',f t 4 HO 'l S A- .0'BA 'II'
1UJJJL-U~d LAw-nZ~d. itU.) -. 1 -4 1 ,4 2 1211 1 P'! P"IA 'IAO flA* ;.304 '4,1- Vt( 1,'
1U~)b-d-AI-.1-. Jjj' 1.-d4'2 1- 21 2I~ 1%. t, H A1A -6 ' 2?A 9
43I 4 '44L* 81
P. )
0 1001iS-Oid--lAVFj-*i44 xjuj-d ~.20 1-4b42 1 .. 2f 2 "'A 4H) 3A* 3'P AW 0 ObE
* t lk-"A zzm - AIJlJ -,C -",im Z1.qrt T ~ ?'P 1 2.
/0311-H/C
AJ-- il I I S - 9 ý T - Z. I W. -9 1 - I ._ r . I ---- . . . I 1 11 . -, - IN I
. Fin 77,34 7.4- 111Aý
L'ýOJE- ;!I; -LJ4IW--LZZU Is JU 21 1 Q 11,142 1. r I
1-.q 60141d 1--li, I SU NO.. 40.5%11 1'. L
Klua ý
The B&V project managers expressed a concern that there was a conflict
between F757 and F366 since the two hangers have interaction. Both
supports 03B-1AFW-R225 Rev. 904 (F366) and 03B-IAFW-R227 Rev. 904 have
been reanalyzed and all interaction between the supports addressed. The
calculations are WBP 830822 054 and WEP 830810 026.
* EN DES CALCULATIONS
DRO M~"PRMM 21214C0051(I P910071*0- Wbaqse IM S3140068 .!2 0810 0
~ ma a. 1IVUITN OF PROBLEM
R-Hold" A Mt A #-&37 Ost
ammi~~44e*A"eey AWW~
WWI_ i~ T06-/4k/ t~
' ftsEceqr RTUN RIINLSTJ.J NAH, 106GB-
TVA mmn. awoo m *Use a~~o Wo (him TVA 10634) it mw. foam is rqimWd
K) EN DES CALCULATIONSs* MiLARY FUDI*AM6 CnWCWWPJýSA
El El STTdMETW or PRo5LM
rLCL~t~tlotS P'ER-FCP. 4-92.q&, Fme
_____ PAUXLA~NX FEEDW~)AT9-
Su~fPojLX 038- IAR)- R='25.
RzarJ~3 FSPoT ~P4~b ~tFe
ReutstoW ~q03O SUPPM KE13~c .U LPD47 '5LE AC5'TCLAt
AV?*C#Ir /C/ LC
wam~in44S) U W.lg (f.r TVA 10534) if man room k Mquhl
1"W MA10520.15.10001 - 39TELEPHONE MEMORANDUM
0DATE 12/14/83
TO0) Xl) H. E. McConnell -TELEPHONE. (615) 632-L450 TI ME 12:53 X7 PM
COMPANY Tennessee Valley Suthoritv cc, H. E. Mc§2onnell T%.
RECORDED BYýW. J. Zidziunas WL R. E. Blaisdell
PROJECT WBNP-Independent Review PROJ. NO. 10520 PDCA/File
SUBJECT Finding Report Responses -FILE NO. 15. 1000_________
I called Mr. McConnell to discuss Findings as follows.
F757 (F366).- The inspection tickets for hanger 03B-lAFWA-R225 Rev. 904 appear tobe against an earlier revision of the drawing and pre-date the hanger drawing byalmost one year, in one case, and by seven~months in another. Re-examination ofF366 data revealed a similar situation. An explanation and/or revised data forthese two findings is needed.
.F782 - The TVA submittal '_addresses certificatio 'n of the hanger to FCR 7598, butthe changes defined in Form 1 do not appear to have been made; and the hangerdrawing 03B-2AFW-R222, which was forwarded byForm 3, still shows the brace.Please clarify the submittal.
F807 - Please verify the cable designation IA3913 has been color-coded properly.The Form 3 certifies Cable 1A3193. Refer to DRR 727 and F807 basis.
F847 - The computer printout is not legible, let alone reproducible. A readablecopy is needed to verify that the outstanding wor .k __is, in fact, listed..-
Data Sheet 4 references Drawing 47A060-3-8 and 47A060-3-8A against F319'but doesnot mention this Finding; in fact, no mention of F847 can be found in the ECN 3511data that was submitted. Clarification and/or additional data is needed beforeB&V can process this Finding.
F881 -Please provide a replacement printout since the one provided will not ade-quately reproduce.
Homer indicated he would look into these items.
I advisedhýim _tha~t _B&V -will -probably come to'Knoxville to- r-evi-ew the -i-nformati~o-nthat supports the DRR matrix.
barn RECEIVED-B y V
PROJECT #I L
10520;'- 1N211810520.15.1000
TELEPHONE MEMORANDUM
DATE 121/
(TO0) 9=M H. E. McConnell -TELEPHONE (6_15)_632---:L_- TIME _____~P
COMPANY Tennessee Valley Suthority cc E. Mc§2onnell T"
RECORDED BY\W. J. Zidziunas R. E. Blaisdell
PROJECT WBNT'-Independent Review _PROJ. NO. 10520 PDCA/File
SUBJECT Finding Report Responses FILE NO. 15.1000_________
I called Mr. McConnell to discuss Findings as _follows.
F757 (F366) -The inspection tickets for hanger 03B-lAFW%-R225 Rev. 904 appear tobe against an earlier revision of the drawing and pre-date the hanger drawing by
.almost one year, in one case, and by seven months in another. Re-examination ofF366 data revealed a similar situation. An explanation and/or revised data forthese two findings is needed.
F782 - The TVA submittal addresses certification of the hanger to FCR 7598, but..ne changes defined in Form 1 do not appear to have been made; and the hangerdrawing 03B-2AFW-R222, which was forwarded by Form 3, still shows the brace.± lease clarify the submittal.
F807 -Please verify the cable designation 1A3913 has been color-coded properly.The Form 3 certifies Gable 1A3193. Refer to DRR 727 and F807 basis.
1-847 -The computer printout is not legible, let alone reproducible. A readableropy .is needed to verify 'that the outstanding work-'is, in fact, listed..-
Thata Sheet 4 references Drawing 47A060-3-8 and 47A060-3-8A against F319 but does
not mention this Finding;.in fact, no mention of F847 can be found in the EC.N 3511data that was submitted. Clarification and/or additional data is needed beforeB&V can process this Finding.
F881 -Please provide a reýplacement _printout since the one provided will not ade-quately reproduce.
Homer indicated he-would l~ook 'into these it -ems. ----
I advised hi*m' t-h-a-t B&V will 'probably come to Knoxville to review the information
that supports the DRR matrix.
barn RECEIVED _E &V_DEC 15 1983
PROJECT #_ZGI_
FORM 3
WATTS BAR'NUCLEAR PLANTTINDEPENDENT REVIEW
10520ODIN5 15510520.92.0000ref: 10520DIN4364
Finding Number /F13 /6 /7/
C
Comments pertinent to finding:
See F371 for comments.
Reference: 47W471-11 R22
Program Team Member
OEDC Program Manager
Chran , OEDC Po icy Comm~ittee
7 4. 4'~v
Black & Veatch ,,J,.~~,4.
Classification: 'Type__________
010B~k.& Veatch -Project Manager
Black & Veatc Seio LRviw Team Chairman
L...Category of
12.11/.03
Date
Date
Date
/Date
SEE 47P$471-1 VIOTE 9.ý,
56: (AK- 0.39
N 2:3
I~ T -II K-
-,K-6 CON
o'*
M~/0.9 T .2-4-IS6 (W- 76.3)
A(- 780 f 76/ 1 6-'6 (AK- 732)
W{-1155 & 1513 9-. y: A-762)
Aw&857- ,
2: f
,kALZ1"-A.?-,535:6 4 6 /
MEAf- 79/-AK-333 M1I374JMý-100IY
A.oce 1 1
d.I to~4rcHumAE q (-aw nr)
:. 1-- -fas note
-93? 4009 1 1~~Icw~', 1iI~Ik 123 DLTI7E0 AIfK-835 S ADDED MA'/17a4 AOR EC.? Af-1486 PTR ECN 393?
IIADDEDV PP 0.4 ADUA1'DAA'/CS PiP. ICN 400-9 I.3511 V // 171 .' - "
ITRIAMMED SZYMA4¾'- 72 CA,' PAýAe- 1'1R CN 3511
POWERHOUSE
AUXILIARY BUILDING UNITS 1I&2
ME CHANICAL
SLEEVES
WATTS BAR NUCLEAR PLANTTENNESSEE VALLEY AUTHORITY
DIVISION OF ENGINEERING DESIGN
,,UBMIT ED PECO.MNE APPROVED
IKNOXVILLE1 7-1P 7Z F-8.51 M 1 4 147 W47 1-11 R?,
PECON NeA.000 *04 CNSTRUCTIED
F/REd
14' 0'(A4K-035)
1 6742(-761)
&3 14t
II 1
FORM 3
WATTS BAR'NUCLEAR PLAL'TIN~DEPENDENT REVIEW
10520DIN515610520.92.0000ref: 10520DIN4332
Finding Number /fF /3 /6 /9/
C
Comments pertinent to finding:
See F371 for comments.
Reference: Drawing 47A427-2-32 RO
Ed/i (1&LProgram Team Member
OEDC Program Manager
ItlJ2L/L.Date
f1 Date
Black & Veatch 06. ~* ~~
Classification: type /~Category 109
Black & Veatch Senior Review Team Chairman
AP eDate
Date
VALVE OPFP,4aXO S#.4AlT
xN
LOCA TYON PLAN
EL EVATIO1NLOOK/IV$ SO/IT/
NOTErS:I.FOR GENERA 4 NOTECS
SEE~ 4 7A4 Z27-i/2. TvA PIPE CLSS G3. ISO :47W42?7-205R5f3
J/O//ITr: 5c
TrYPE: feRDES/GA LOAP.
FROB3: N3 --3/-A ZA~
-4-A
~EP~PFRA"S4&CA/ 35 W8-8309130
SEISMIC CATEGORf I'STRUCTURES
MECHANICAL- UNIT ICATEGORY I SUPPCRT FORSUPPORT DETAIL 2 - 2
or- -
1,Vlrl,4,4 ISS11,r PC,? rCy -?511
FORM1 3
WATTS BAR'NUCLZAkR ?L.ANTINDEPENDENT REVIE1
10520DIN522110520.92.0000ref: 10520DIN4318
Finding Number / F / 3 / 7 /0
0
Comments pertinent to finding:
The support was redesigned and issued as 03B-2AFW-R237 R901 under EGN 3511 on3/24/83. The loads for the support are in agreement with load table drawing47B427-512 RO. The support is for joint 41 in the Y direction and has designloads of +780 and -2400. 'All corrective action is complete.
References: ECN 351103B-2AFW-R237 R90147B427-512 RO
Program Team Member
c~r~lt1r wE4~mwOEDC Program Manager
SU \(N-~s\)vr.. ~ (~A ~Chairman, OBVý Policy Committee .TJ
1///8? &-3Date
71 at
Date
B lack & Veat ch7 rv, -4- 41. / .- C.Ao-.. A"- er".. ~ ~4.4 ~ 44L. -
Ca s~sifi.*c a t ion : Typ e Category #
/ QBlz(! & Veatch -Project Manager
Black~ & Veatch Senior Review Team Chairman
Date
Date
ýf ý( 6,ý
ENGINEERING CHANGE NOTICECOVER SHEET SwP 83 0314 506
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITY ECN No. 31
DIVISION OF ENGINEERING DESIGN ttBaNulrPanSigCtyT.
To: Construction Project Manager asBrNuetPaSpigCl I
From: Design Project Manager SP24G-
DATE MAR 141983 & eI-l'EI
Was IJ Analysis Required: yes _ No I/
Project W i Affected Unit(s) z__-____
System or Feature LiX U4O de ySS g3 WAC ,
Reference & Description of Change EN1E E # Ft /
V1FArCH ,ImmAlAEfAIr erIW i~'&. 2F N06 8?,/006 ZO z~~TC 0)
DRAWINGS OR B/M'S INVOLVED: Yes Date Branch EGNVISPOTOACEor Data Sheet I UPOTRRNM
(Data Sheets Required) No Available Aproa Require
ENGINEERING SUPPORT MRA.CUiES
CivilElectricalMechanical
Nuclear
NUCLEAR PR~OECTS DESIGN GROUPS
Civil I 1Electrical+4"Mech ~
FOSSIL. HYDRO A SPECIAL PROJECTS DESIGN
SPECIAL DESIGN PROJECTS
ARCNITECTUIAL SUPPORT 112A01.
Unitts I I I
CC (Attacnmew1): &Ae - Yes 5
CHI1F: ARC"ITECTU:NAL.1" SUPR .UA . VIC126 C-4
CIEF. C I ViL E'1NER1 G SrM1AIC. 4i C-kCHIEF. EL ECTRICAL ENGINEERING IAC.HCZ C-1kC IEF. ECHANICAL ENGINEERINGNNC. CIAC
C "E. ULEAR ENGINEER. W LC126 C-9
C"hIEF. QUALITY ASURAnC REANCH. 5100 "IS-
JA2-
No ____
Required for PSAR or FSAR N E
Required for Preoperational Test: 0 -
It Yes, Test No.
Vendor Backcharges Involved N
Seismic Analysis ReQuiredYENonconformance Report RequiredQs CA Applies _________
Security System ModifiedN2
z 1 ~ Vendor(s) involved: bin
CHIEF, COST PLA-NIgo Aso CONTROL STAFF. V1C04 c-9CIE F. SPEC IAL DESIGN PROJECTS, W2022% C-11ANAGI~ER OF ConSTRUCTIDAI. E782% C-9
PLANT SUPERINTUDCENT.ED$. We") C-
Date? ?
n I Lun ALL THL2.
IAQUAN
br-rv
__4 - I/a."'CONCRETE P'WNRC EiE~)YVAk ____
- IEZ.- Z 10- FOT S-TUT -ITSM -42. Y1IVA o Fjt)- _
~~~TVA._NVG. 4ZS~-~A - -' -5
------- .* .. .~ ................ ......... . .... .... J..O.. .... .. . . .
...............~iEC IO N .................... ............ Y.... j l..... .... ... .... .... ....
..... ..... ....
.. ...... _LOAD;
................................... .... p
K.~~~~~. E V .L.~O~1 c ......-- ~ _
T.V.A.~~ . ..OC TIO..LN.
DRAVO CORPORATION P.O. E-82T. V. A. CONTRACT #174 C 38-83015'WATTS BAR NUCLEAR PLANT.- UNIT 4_1 2
__TI/A R 90,0 =VEA/DNORS RO
s c-lLL A4 DATE 2' 7-~~1
IBERGEN-PATERSON PIPESUPPORT CORP.I AUX. FEEDWATER .. -
REF. WiING STUCTUMAD ls. 47Wý427-2-1 _1
Jos NO . GE Q7 o E FAB N0.0 0 a %~.
MARK & WaUTr av
waT._ _ _IPART NO.]1
200-32 aoo
~~T PIPE CLAMP_____
:-5~'" R55A%.1/?" 4ý AHH NUT
.. s.. .
.. .. ... ..
Ai& -
z A la m - R'-* LG V411-4 HOLSe, SYVA,f? W^ LG y7v&
MUJTE3
1. LML I N FPtN s UlTIE ~IF{W
ALLOWABLELUG 5
STRESS343003430034300159003430015-000159 00
/670016500.3430034300/6400/590015 70014~900
14 900/~00001200028260
/5-4c0/06001//800/0600
/060/4100/4/00/4/00/5500/55-009500o95D0
2. , E\'vEUITS Iti I1,GES. ;,MA(PR; '7:+ ~f-;L'''
is RT}i*X L uIffs 911BSTPLLED 'iETICAIY AWiYtE
3. DIFECTII -
- RR -
WTPL -
SMTED.
(i?11 MaE~iTS N~E U~ FAJTEDTI-E SECVD LIZE. IF UiTEFEDRhEY SFFCRTaaEUDIHN-RE- PIPE IN THIS MOITIWI.
Z.
-y'SZ.UilDIFEC[ICM FESTPAWIN.RIGID FESTRAH{T
=TB ýfi~ I HRE LJG I S PLL&D TO DfI '0E NMT ThEPIPE WILL RIE STFESS DIFFEPE-Na EET-EEN Th H ALLhWBESTFESS NOJ RE UffLYI PAFE STF7.SS FCR VAwRIU C(ThI-TIU-6. RhEA [fITES ME~ LM) IN SHIMI TI-r U,)3 SEECEB FEFUR 76-20 NiD SLMRT EESIGN CRITERIA FCR FOUR~EETAILSI
6. CL = lASSCF PIFEL,
7. LESJGN [2PI AFFE ýrfilALIZED.8. FOR RLE;-ERNCE ANJD
4-7W.,4?--2O5) 20oG.
321I0&e -5 /b-
coMPApNIlOM DwG5. SEE
Jc- EP E:, SCH4F--FE--R --
AUX. BL-DG UNITS I a 2
PROSLEM N3-3-IA,2AAUX. FEEDWATER SYS.
SUPPORT LOADS
iT 3AR '4u"CLjEAZ~
SL E ~ m ý47 8 1 L7 -5 1 R 0
I 9e7
=3 8L 't g
LINEAR SUPPORT TYPES (TPIPE)
&' JAL
BLG 4 6 SUPPORT 171 ZAA%. B TrIf\ 1 2 tG LI
ZLCN [DESIGN LOADS P IP E IM O'/E VT a cGN
.SI .OINT DIR CL + 0.0 20 L A
SC RR 2 10 /0 0.00 0.0.020
A 56 y PR 2 /0 /0 0.00 0.00 J0 2600
B 5CP 2 ,900 230.0 0.00 0.00 J10 4500
U LS 2 0 3500 0.00 0.0 77 300
D 5 X. R 2 3400 4800 0.00 0.00 .20 7700
~OI/5 Y 1 .030 0.00 0.00 .20 30
27 Y us 2 0 ?38.0 .0000 2600
2'- P 2 60 /00 .20 0.00 0.00 20
27 35 y US 2 0 a/0 . .0 0.00 2/,00
IL 2 1/0D 1200 .10 0.00 .0/0
27 2 6300 5700 D.20 0.00 .10 14000
4u 31 Rus 2 80 2q0 .0 0.00 0.100 2200
5 Y US 2 0 3/00 ?0 0.00 0.00 31900
-1'ý L7 3 2 /2500 12 070 D CI 0.00 A0 /8000C.1%D 41R 2 300 70DA3200
I 63 y' US720 280030 0.00 0.00 20
41 Y R 2 /40 440.0 0.0 0.00150
Y5 U z 2 0 00 240 0.00o .80 2700
? _ 77~ S 20 3 10 0 .10 0 ..0 0 0. 00 3 10 0
51RR? 2 7101700 .1 00003Y
573 Y US 2- 0 00 0.00 /800~~~2 005 40
8 99 X PP 2 5 320 500 0.0 .0 .0 30
57 z9 Y U 0 3/900 0.00 0.00 0.00 C10
~D SLISP 2 30 300.0 000 0.00 3100
163 Y RP 2 /00 1400 -30 0.00 .010
10 USP. 2 3CCi 3800 .90 0.00 00050
77i~ Y loo 27/O300 .20 0.00 0.00 63600
93~ Z R? 2 576CO~ 5600 ./ 0.00 0.00 5000
-B . 9- --X
-- 2- 38 0 46 0 0.00.0 0003
0
FORM 3
WATTS BAR* NUCLEAkR ?LA!%TINDEPENDENT EEVEW
q0?10520DIN515710520.92.0000ref: 10520DIN4333
Finding Number / F / 3/7 /1/
C
Commets pertinent to finding: The corrective action is as stated on the attachedTable I. This finding is one of 24 associated with the mishandling of ECN 2576(see 5 on page 5-3 and 6.3.2 on page 6-16 of the B&V Report). This response coversall 24 findings. EGN.2576 covered major changes to supports on both Unit 1 andUnit 2. At the time Black and Veatch identified the findings it was thought by theDesign Project that all Unit 1 work under ECN 2576 was *complete and the closure ofthe EGN was awaiting completion of Unit 2 work. This was the mishandling of an ECNidentified by the B&V Report. A nonconformance report, WBNSWP83Ol, was issued on themishandling of this ECN. ECN 3511 was issued to initiate and track to closure thecorrective action. The attached EGN 3511 data sheet associates 16 findings with theappropriate drawing and revision. The corrective action for 7 of the findings wasaccomplished under ECN 3198, which was a major reanalysis for the auxiliary feedwatersystem underway at the time of the B&V review. These findings are F845, F855, F949,F950, F951, F955, and F958. One finding's (F853) corrective action was accomplishedper incorporation of FCR H-7589 issued under ECN Sl.
References: NCR WBNSWP8301,ECN 3511, ECN 3198, and drawing
Programa Team Member
OEDC Program Manager
47A450-3-67 Ri
Date
D#ate
Black & Veatch epr4htc"~
Category ~
/Bock .& Veatch -Project Manager
Black & Veatc SeirRview Team Chairman
Z-/7lDate
1 2-11s~-
Date
Classification: 'Type
TABLE I
24 FINDINGS ASSOCIATED WITH ECN 2576
FindingNo. NCR
F367 WBNSWP8307F369 WBNSWP8301F371 WBNSWP8301F756 WBNSWP8301F767 WBNSWP8301F783 WBNSWP8301F784 WBNSWP8301F788 WBNSWP8301
F794 WBNSWP8301F845 WBNSWP8301F853 WBNSWP8301F855 WBNSWP8301F899 WBNSWP8301
F911 WBNSWP8301F949 WBNSWP8301F950 WBNSWP8301F951 WBNSWP8301F955 WBNSWP8301F958 WBNSWP8301F9ý63 WBNSWP8301F965 WBNSWP8301F964 WBNSWP8301F975 WBNSWP8301
F986 WBNSWP8301
*To be issued by 12/09/83
35113511351135113511351135113511
35113198
31982576351125763511319831983198319831983511351135112576351125763511
Drawings Issued
47W471-11 R2247A427-2-32 RO47A450-3-67 Ri03B-1AFW-V207 R91003B-2AFW-R3 R90103B-2AFW-R223 R90203B-1AFW-R2 R90447A427-2-34 RO03B-1AFW-R11 R90203B-1AFW-R26 R90603B-lAFW-R91 R90203B-1AFW-R236 R90203B-1AFW-V56 R90103B-lAFW-R15 R90347W427-206 R503B-1AFW-R16 R903.47A060-3-34 RO47A427-1-3 RO47A427-7-04 RO47A427-7-05 RO47A427-7-06 RO47A427-7-07 RO47A427-3'-7 R203B-1AFW-R182 R90303B-1AFW-R180 R9011-03A-404 R90347W427-219 Ri47A427-6-1 RO47W427-5 R7
DateDrawings Issued
05/20/8304 /08/8303/24/83
08/10/8303/24/8304/08/8303/24/8303/24/8302/28/8301/28/8303/10/8308/25/8307/27/8309/17/82
03108
03/10/8303/10/8303/10/8303/10/8303/10/8303/24/8303/24/83
09 /17 /8204/28/8309 /16 /8204 /14 /83
**Per FCR on ECN 51 (FCR H-7589)
DIVISION OF ENGINEERING DESIG NNONCONFORMANCE -REPORT
MEDS Ncc.sson No Oil! 034
DW REPORT NO. V,3\SWP8301 RJ.
Ki.WATS BR N1UCLEAR PLANT LIUNIT 1K ===:RE.=/CRGANIZA-;TION/DATE R. L. Ilichr/S1,.T/Januarv 11, 19,83
E DESCi?TION OF CONDITION
Var~z-_us supports on the auxiliary feedwater system have not been modified, redesigned,or i~nitially designed per revised analysis under ECN 2576.
The above condition represents a situation which, if it had not been detected, may haveresulted in the inability of pipe supports to accomplish their safety function. Thesedisc-:en-ancies were identified during Black & Veatch review on findings F369, F371, F756,F76 7 , F783, F784, F788, F794, F845, F853, F355, F89.9, F911, F9-49, F950, F951, P955, F958,_9063, IP964, and F965.
OF: O OCCURRENCE EST( XACT.( /08 SIGNIFICANT CONDITION ADVERSE TOOQUALITY
1 OF DISCOVERY Black & Veatch Review YES 7L NO I
CDE (EN DES-EP 8.01) N/A Oiý -BRANCH CHIEF/DATELQI
CORýECTIVE ACTION:
-- :.ACTiON. DEVIATES FROM A DESIGN CRITERIA REQUIREMOENT YSN
TERIAý DOC UKMENT NO. EXCEPTION RECUEST NO.
YES N) E N SCHEDULE IMPACT L!7 777A.-
A.
NONICONFORMANCE REPORTW7 REPORT ','. 5S?
2Z :4-SSI GNAELE CA USE: (REQU IRED IF SIGN IF ICANT)
THIS IS A GENERIC CONDITION YES N O0iiACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
19 'I!NEPENDENT REVIEW:
20O LABOR EST. ) . ACT.(C MH 12 SCHEDULE EST. ),I.ACT.(I
ý222 LC-:VITY NO. TASK .. ESCRIPTION DT NTAE
25 REMARKS:"I~
"71BUTION:2-ýNST PROJtFCT MANAGER R. L. Ilic.N CES PIROjECT MANAGER
CHIEF, ESSý.FFICE OF QA%`BS (for Significant NCRs('*
.E Cs CI S'.SRS (for Significant NCRs)-.SSISTANT TO THE MANAGER OF OEDC (Quality
and Nuclear Safery)--for Significant NCRS* z!STRIBUTE AFTER THIS SIGNATURE
..ANDCARRY COPY TO NEB".LS
hi, 315i GB-K E61 ALL EN DES ACTION COMPLETE:
*BRANCH CHI EF/ORG.
MEDS ACCESSION NO.
27:
9-77'
TENNESSEE VALLEY AUTHORIT-Y --DIV IS!OPN OF EN*GINEERINr. bmEsIG
ENGINEERING CHANGE NOTICE NO.______ BRANCH [CE5 L-;
antii, .5pring '..fy. TNe~sign Project Manager 5,4,
PAG E
Released By:~ / e a n -- a a e
Preparing Section MEDS Accession No. I . MEDS Accession No.
Prepared 0S WQ.-O31 5 0 7 WBP 13 8 9 507S, R . R -~'Q 5 2Soa aetion ýd. WBP P83042i8 513 5 ,WBP ..830 28 5
Supervisor: -E""
Staff Eng. orW~ ,t 6 R-1.1 5Architect: zWB '83072~7 504g 6(JWB 83 0 3 0GroupRWB
A-.ad.--.-.-'WB '830 8 08 522 7WBP .'83 10 28 5 09Branch IIt W B-
Project \A/T7 CA- M L. L- ]a ^ Affe Cted Units
System, or Feature AAJy. r6 r-,^~~i-~.
Reference & Description of Change c= I-4AN r-..c65 'DUE. TO klkkcCA-A. -~tr-e~ 14
- SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV. DATE PRE. SECT. GROUPEIRANCH ECN D.P. ECITO FRVSO TOTALNO. IISSUED IPARED SUPV. HEAD- CHIEF 1CLERK MOR. IECITO FRVSO PAGES
_ ___ ~ r~. a c f ci, d pe.e~ Z~3 ~q 3 fl PSM1--k Mk eftc& Ad d W-C54
7-F 1 q-e-3 a-11 MX-K e A DO6 6hV &- ,4 N 1 40,0 Ah& 3/ ýhj' r5 -3
Z~tA Lo~ 3 CS. D12LFTL DU~rS 1 112 ES-i-
rasas follows:
Information:
CHIEF, COSr PLANNING AND CONTROL. STAFF. W12C7a c PLANT SUPERINTENDENTCHIEF, ARCIIITECTURAL SUPPORT SRANC2. ~aLeCKCONSTRUCTION PROJECT MANAGERCH4IEF. cI!1u. ERGI1EERI*C sxucg1wvozz c- NEDS, V5563 C-9CH IEF, EL -T ICAL ENGINEERING BRANCH, VSC12 - ARMS: 640 CST2ZCCHIIEF, SPECIAL DESIGN PROJECTS, W2D224 C-K
UA I A ZIN r- r_ 1 ri U.
TENNE! SEE VALLEY AUTHORITYDIVISIO0N OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO. 351DATA SHEET NO.I
DRAWING OR SIM NUM8ER
1 IOwo ISSUE DATE REMARKS
REV. EXPECTED jACTUAL
kA. - A-
-3~~3 __ AJ3-3){
j j \g q ;t-7 - io 6 1 \j/ L327-z - 3 I ý -,A -I k Ni
1__ _l 51131--2 .9
I q W__421_-__OD_-a
I j -1727.~3 N:;- 3'i~
-4 7 }o /- 13 0 93 1. _.
1fJ17R-7 3_y _ '712~ - 1/3-7'35
____ 84 5--;;37 tct- sA ,3 -3 -3 r
_071__)98 0- % 1 IV3 - 3 3A/
J±/3 2-3 78 (11
AFFECTED
PAGE
REMARKS
TV-~1055E EN DS-779)ENGINEERING CHANGE NOTICE NO. 3~/tJTENNESSEE VALLEY AUTHORITY
DIVISION OF ENGINEERING DESIGNJ DATA SHEET NO.LZ PAGEW
ISSUE DATE IN E UPDATEDOWG DATA 9-fEET
UNIT DRAWING DR B/M. NUMBER REV. EXPECTED ACTUAL REMARKS ýREV. NO.
-fi /3 4-27 - 3 83 o 1j288 1413-3.-1114__4-7 k/42-27 -2-3 0 A13__- __-_/4
1 '-7WS4 2- 7 -- 3 J45g I47e2..-3Pl 41
1- 7W4 7 -. z L2D 19o:5-83
___~~ C______LETE :C2 A ~
I 4TBZ7- !270 1-o il ei i-31-33 N:3- 3 - 1,44-3 -5 ~ JN3- 14 2-
.. ......
TVA 10575E (EN DES-7-79)
TEN'NESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. 356//DATA-SHEET NO. 4fI
q1i1ENGINEERING CHANGE NOTICE
COVER SHEET SWP W8 0314 506,(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITYDP-V"SION OF ENGINEERING DESIGN
- - -Wafts Bsr Nuclew Plant, SpiriS Ciiy' j-LTo: Construction Project Manager
ECN NO. 3
From: Design Project Manager
DATE MAR 14 1983
SWP 20`4 GB-K
&MI~Je (4K-21(Was IJ Analysis Required: Yes No t/
/1 Released: Q tA- AProjedt'Eng eer- Des'gn Prt ect Manager Date
SCOPE
ProJectLd' 13A &1 W AI"r Affected Unit(s)j ___
Sys'ternor Feature, L4I LI4-Y 6O,7F -'SY 38. NC~ fzReference & Description of Change ENDECS Ft I L66ýI CAlC&D$IQ S
42I mg aipo wpevr eEvmEw T.'M 2pp m/F q' looAZZ z-4 77Ar--a -A)
WNGS OR B/M'S INVOLVED:
W (ata Sheets Required)
ENZISIERiNG SUIPPORT 13RAINcES
Civil
Electrical
Mechanical
Nuclear
NUCL.EAR PROJECTS DESIGN GROUP4.
Civil I.Electrical 7-
Mech 2
rotsal. HYDRO 6 310ECl1A-L RJiJC-TSotSIGN
SPECIAL DESIGN PROJECTS-
ARCHITECTURAL SUPPOr RTSANCH
;"~'ý'SIL WORK MUST BE DONE BEFORE
FV-O It FuelLTerr ITest ILoadI Power
Yes Date Branchor Data Sheet EUCIRELRING SUPPORT BRANCHES
No Available Approval Required
__________ Deign Project Ma gr
NO Approved:
No ENS CIVIL St. CHIEF
NA fAm'YES EMS ELE&ICALsi. CIEF
jffi]ý5 ENS !EC14CWAL U. CM IEF
ClhieI' Nuclear Engineer
NO ____ Required for PSAR or FSAR
140 Required for Preoperational Test:If Yes, Test No.
Vendor Backcharges InvolvedSeismic Analysis RequiredNonconformance Report Required
Comm'I Is? QA AppliesOoer~ Refel. - Security System Modified
Vendor(s) involved:L I I I
CC (Attacnme-.til: 44a - Yes f 5)CHIEF. kQCHtrECnJRAL SUPPORT BRANCH. WSC126 C-9CPI tF. CIV1L ERGI EERIIG BRANCH. W90224 C-KC4 E ̀. EL ECTPICLL ENGINEEQING BRANCH. WSC126 C-KcHIE or P[CFA:CA L ENG I EERN SARCH. VIC126 C-KCHIE F. RULCLEAR EKGIN1EERO WlOC126 C-9CVI'IL, JALITT ASSURAnCC BRANCH. slo0 "IS-
CHIEF. COST Pt.Asiar. ARC CONTROL STAFF, 1012C74 c-,BCHIEF. SPECIAL DESIGN PROJECTS. wzo225 C-KMANAGER OF CONSTRUCTION. E71124 C-9PLANT SUJPERINTENDENTHEDS. W5663 C-9
Yes or No
D7ate
Date
Date
Z3-7-24Date
YIES
NInI
~ENNES.EE VALLEY AUTHOrRTY ENGINEERING CHANGE NOTICE No. EIDIV ISKt' 3.~FENGINEERING'DESIGNDAASETN.Z 8AC-
PAGE LF r ~ Project Ma
Preparinr Se..ction
naoer S'5'W 2,04' G8-K
Prepared
Total Page (R0): 2Section i - ii:
WBP '830713
Released By: '4'
4~c Design Project Manager
Ri85Staff Eng- or RR[Architec:: 26
rGroup RliHead: f-4V
B ranch__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Poet &I 77r I L1 4 A W I- Affected Units~ ~System or Feature 4Lk)/I~ W* 7r. - Si'SReference &Description at Change ~/A(~ !U~~ L~-± tr7~ A7~ A~
SEE ASSOCIATED DRAWINGS LIST. REVERSE SIDE
REV.1 DATE IPRE- SECT. G-ROiU-P.5 ECN D.P.r,4. ISSUED PARED SUPV. HEAD CHIEF CLERK MOR. DECRITION OF REVISION ~ TOTAL____ ___ ____ ___ ____ ___ ____ ___ ____ ___ ____ ___ PAGES
M& l< ~.7roD~
__~m ________Adaii formation: j
C1JE~F, CO:T 'ýA&uu luG AND 004TbOL STAFF.-W120a C-K PLANT SUP(ERINTUO[ITCNIEF. ARCuN E11JOAL S'JPPOWT *IAncV, W4C&2E . CONSTRUCTIOW paPIJECT NAAECi'IZF, CMIL -IGclUING SRAjCA.vW9022a C-S NEOS* 55I6) C-gCAE.i'EY LE:71:AL ESGilCENIIG muANCu1, WOC126 c-K AENS. 640 C3T2-CCRIIEF. SPEC)*-. DESIGN PROJECTS. WZD224 C-9
~WP £3 014 50 8It "CME' A I I -
-------------- 11
TENNESSEE VALLEY AUTHORITY--DIVISION OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO.ITDATA SHEET NO. Z..
AFFECTED' ORI OWG ISSUE DATE
UNIT DANGOR filM NUMBER REV. EXPCEI ACTUAL REMARKS
nI .~ f -e
DAGEI
FOAT~AREV.
& v- -. . U ~ ______________________________________________________________
I II _________ I
I I___ I I
_______________ I _________________________________________________________ _________________ - - __________________________________________________________________________
__ I _________ ___ ___ I__ I __ __ I
__ I __ II I
I _
I ___ I I__ I _______ I__________ 1 I__ .1 I__ I I
__ I I____ __ I
__ j I__ I I__ .1 _________ ___ ___ I
_______ I I__ *1 I__ I I___ I ___________ I
___ IV. II I ___ ____________
TrENNZ-SSE.E VALLEY AUTHOR ITDIVISIC!14 OF ENGINEERING OESI
ENGINEERING CHANGE NOTICE NO. 37. N DATA SHEET N.O.
Released By:esign Project manager 20'~~r4 GB-K14%R 14 1983
I
EIRANCH
PAGE I-4*/f . A'&ry1
-tV5ý- Design Project Manager
,Prepariin; Section MIEDS Accession No. -- - IIMEDS Accession No.
Prepa~red C OE W-P 03 0314 5 09 4 _ _ _ __ _ _ _
By: -i~A~ 1 Zfl C- __ __ _ __ _ __ _
Total Pa~ue (RO): R 09R
Section RfWP '83 0401 55Suzerviscr: /10StaffEng. or 2 R
Group RR
Head: A7
Branch I _______________I______
tChief: =ate
SCOPE
Project a~~7 e3/ ! 6L~I 14 r Affected Units 1$ ,System or eature A9'LAC 7 5SReference & Description of Change 7-cF~D- 6 T g&i-e6lt ,#vD fjtz)-7Yj.vi
SEE ASSOCIATED D RAWINGS LIST, REVERSE SIDE
RZV. OATZ PRE" SECT. GROUPBAC ECN D.P. DSRPINORESONTOTALNO. ISSUED PARED SUPV. HEAD. CHIEFCLERK MGR. ESIPONORVSONPAGES
__- ~'%rh _ _____I:_____________________
i'als as follows:
'046 iformation:y
OILC.-3 PLAIIINS AND CONTROL. STAFF, vizc74 C-9. PtAIT SUJPERINTENDENTC AICF g A TGiCTUfAL SUJPPORT SRAICK W4CL2 g CONSTRUCTION PROJECT MAXACER
U:C~IF ;VJ. ENGIIUIIG 62AAcM.vv9oaza C-9 45 RED S " C-NEl, EILLZtICAL ENGINEERING BRANCH. WOC126 C-K ARMS: .40 CSTCZ-C
EF~r SPF:&L DESIGN PROJECTS. W2D224C-
EN, z-~. VALLEY AUTHORITY:ivvSiCZ'. OF ENGINEERING DESIGN.
ENGINEERING CHANGE NOTICE NO.2s:LDATA SHEET NO. --'
DRAl N ORRIMNUMER DWG ISSUE DATE J______________UNIVr DRAWINGOR_____NUM3ER_ REV._EXPECTED ACTUAL REMARK,,
-3 K
.PAGE
EUPc DATA~'RE V.
_____ _____ _____ LE7~
ii~z f4~4,z9Co- 8 ~ .31i3 I
___ I __________
__ I _______ _________
I I
_ *1* IT I
_____ I I__ I I__ I I
___ I I_I I__ I ________
I
__________I ___________ I
__ I -~ __ I___ I __________
I___________________ I -- _____________________ I
__________________ ____ ____ IF ___ I
F _ I_________________________ ______ ______ I
TEENNkS- ,- VALLEY AtUTHORIT-Y --C~dSI~. ~PENGINEERING. DESIGN.
To:VWatts Car N
pwproet anager SW.,p 20~4
I- ig S-Lection
PreparedBY: G5:LAPENN,V67-0A1'Total.-Pages (R0):.. aII
SedionOQ&ý j J/3o1"1L?
Staff Eng. 6 ,.71IRArchiteict:-- I . IAI
ENGINEERING CHANGE NOTICE No. .3511DATA SHEET NO. 4- n
ucdea Plant, Sprin9 Cdy1 ILI-n ~ - -Released By-
MI~L)S At~CP~IOfl N0
VRANCH SWj
-' PAGELJ
- Isign Proj~ct Manager
M~US AC~eS~aofl No
Rjw P30314 51 4vp'o~
MED Accession--~ ____________Accession ____No
549519'8 3 03 295U W BP 83 0 82 3
-~ ______________________________________________________________ -
)VIP '83~r 0412 518 WBP '83 0 9.12 507fR RIoHead:7
Branch':!:-_ _ __ _ __ _ _ __ _ __ _ _
Chief: a tej B '3 0 I
Proiec4-ý7 b'Ii77-S &P IUCL.4i'tA PlAk7- ...-vAftected Units / .
Systefl-qf Feature 4UyL1,j,,ey F~E,601/A T-6e -~
R~eferenice &Description of Change_ IA'GSOi &4, &AMCXe~ V m7,4 /'o-PFA1dFN- EY,eY!5W
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
REV.[ DATE PRE- SECT. GROU-kPB RANCH ECN D.P.DECITOOFRVSNTTANO. ISSUED 1PAREO SUPV. HEAD- CHIEF CLERK MGR. :EPITONO EISO OAGE
~ C eQ mov~ci -as PAE
13~ -2
Cl5r LCI A 11(1 1A*CM S 1111 CK t Avo S Z & SI
CAIU. SPEII. JCSIGM ROKJ[CTS 0ZD22t C-KsENy
549
TENNESSEE VALLEY AUTHORITYDIVIS ION OF ENGINEERING DESIGN-
ENGINEERING CHANGE NOTI E NO.. 31511DATA SHEET NO.
PAGE.
AFFECTED fDW[ ISSUE DATEuNIT I DRAWING OR BIM NUMBER 4 REV.~ EXPECTED ACTUAL REMARKS
47w~rv~. -~II/):~4
*1 w ý- - 4.-
jill-sqw -- a
-~~~~~r B _ _ _ _ _7Ia
.17
H;--~~ T __
MeeV-msp-
I ~~~9 Fl___ __ ___________
EIZL ___ _ _ _ __ _____J/
A f A W-RZZI 30q 4-____ AL __pb_____________
_ZI ZAFW -~Z1 f __ Ce~~~
II _______3__;____ 44sp
,rN.NESS --E VALLEY AUTHORITY -DI VI'SION CP ENGINEERING DESIGN.
ENGINEERING CHANGE NOT1CE NO.-3 'z\\DATASH'EET NO. A-
ORAWING OR HIM NUM13ER IOWO ISSUE DATE
OREV. EXPECTED IACTUAL
9OL4I3-~\-s3k ZLI-~I~
REMARKS
*1
ýN DATA SHEETrREV. NO.
-~~~~~~ 0 0 15 8 3 1 ..........- 2 q -..L...L
3-aq ~N 444-Z-7 - -7 2__1c B¶?~c
----- -----
4 6 445--7 L- ___ w b 3nw 13V
'1 1 4A, o Go- 3.- 5-1 83 q-1~ 6_
4IO(A;,O- 3-10 3 ~ j-3¶~Z
A..- _----_ q_ _ _ _ __q-
_ , -ll F2 4
__ _ __ _ __ _ __ _
- -" -7 -7,JL ~ ~ A
_______ '- I __________ _______7__E171jl
___1ý Aq-Z__ -7 -E__ I _ __ _
1- rZ - 7 ! -Z F- .z ZQ -- '- 393A 0__ __E
k_______________ ^. ~-I ^-Z I. _ _ _ _ _ _ _ _ _
18fi USV 0 .M3~e
4 -7 AF' - __i 0 \ 0 Z-3 -O%
-7A4Z1-4--S 0 -8
ifPAGE E
TVA 1Z57SE (EN DES-7-79)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
ENGINEERING CHANGE NOTICE NO. IIDATA .SHEET NO. 4-
DRAWING OR B/M NUMBERDWGREV.
ISSUE DATE
EXPECTED IACTUALI~ I
'DATAf1R'EV. NCREMARKS
I. *1
___ ___ __ ___ __ 18-cl8 s__ -
0 S-7 '
_____c 44-51_______ P___ I C41c~ 7t
a. 0-35 - 2 Ilvr -e3' iz-q-93 _ _ _ _ _ _ _ _
___ -1M 'O-3-34 __Iz~I~~(Fq 1)___ _ _____ _____ __ Zi-9-3 •
I-ft-. .t-t 1- 1
I _____________ ~
I _______________ _______________________________________________________________ __________________ _______________________________________________________________________________
'I ___________________________________ __________
_________ I __________
F -~ ______________________
_ I __________ ___
-I.
I ___________ ___ ___ ______________
__ I _________ _ ___ ___ ___________
(-A:.CTED41IT
(7
I A, F 96ý9-5-831 ý-16-93 VOID-
TENN.EISSEE VALLEY AUTHORMTY.=IIN OF ENGINEERING OESIGt
ENGINEERING CH*ýNGE NOTICE NO..3ýIDATA SHEET rNO .ýE:
Wats krNcklew Plant, Spring 01y, TIN --
Rele-ased By:AlDesign Project Manager SWP 204 G8.K. A 64R 14 1ýR(
/;7//, 7'I
~' 7 Diign. Project /a4nager
Prep.-: n; Section MEDS Accession No. MD ccessiorY0.R~J -A- R
Prepar 0 P '0`3 0314 511 4By; S OsTS-rSA_-__ _ _ _ _ _ _ _ _ _ _ _ _ _
Total Pzges (RO): R. R1 BP_ _ _ _ _ _ _ _ _
Section __________'830419 ________5
Su oefrvo-or A A R RI,~Staff Exxg. or *Archiltect: i _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
GroupRHed 3 7
Chief:SCOPE
Project L-WAITS BA-I-LM VCLAIr-A PL-Aw -r Affected Units_ _____
System or Future Aux B L-C -A'-IT4-
Reference & Description of Change CH6*AU4Es 7 py) E-r TO LAC..ct.. ;,-A C.
I -4 SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDEI-I
REV. CATE PRE- SECT. GROU RANCH1 ECN D.P.TOA'No. IS- UED IPARED SUPV. HEAD CHIEF CLERK MGR. DESCRIPTION OF REVISION POALE
.~:rials as foli~o.
AWSIa Information:
Cy~. IEF. `_ F LANNING AID CONTROL STAFF. WIC7 C-9 PLANT SUPERINTENDENT:X; EF. _.I~>TECTU Li SUJPPORT BRANCH. W;4126, C-K CON STRUCTICS PROJECT NANAGE*CUIEr, TII. E1GTIEERvG~ 9PAICH.vW90221 c-i REDS. WS563 C-K,41IEF, c.9:TRICAL ENI;CINERIBG 89ANCH, VOC126 C-9 ARKS. 640 CSTZ-CCA I CF. 1pIA DE SI GN PROJCCTS. W20229 C-K
4t1&BRANCH FIs3w
PAGE Lý' I
TENNESSEE VAL-LEY AUTHORITY
ODIS.ItON CF ENGINEERING DESIGN.
AFFECTEDjDRAWING OR B/M NUMBER
ENGINEERING CHANGE NOTICE NO.35IDATA SHEET NO.5
DWG [ ISSUE DATEREV. IEXPECTED ACTUAL I - REMARKS -
-
~
5V\.~ e~~D- 1~2-D ____ ADO~D t~J6,_____ _____ I
I I
_____ _--
I
I I I
I I II I _____________
I ___ I
ii _ U
___ I
1 ____________ ___ ___ I
I I* I
II ______________
I. ___________
I
r I
t I ___ I
______________________________________ ______________________________________ I
I I
I ____________ ___ I
I I_______
__ I
L _______ __
_____________ ___ I
-~7-
PAGE[
DATýAUPO'R EV.N
T-zNN=-S*ZEE VALLEY AUTHORITYDiVISIC't OF EN'GINEERING DESIGN ENGINEERING CHANGE NOTICE NO. 31
DATA SH EET NQ-.(Watts Bar Nuclear MfantSpigjy._____
T~~~~, tSrn Ct.T /1<
BRANCHJUP
PAG EfIFPD Project 1.anager SWp 204 raK
5 -1-33Released By: A r-
/N 7 Pr'ject Mýanager
r ,repa.;- Section -MEDS Accession No. MAEDS Accession No.AJ? 1B F, W m4- R R
Prprc -rag 0 1-P 480 0 O ___________
By: W.~ Lý Coi-0&- Date_ .l B__P__83_-0_5_0_9_5_0_7
Total Plkes (RO): 2- RR
Section5Supervi~r:
Staff Erig. or 2 6Architecz: Mff /A_________2______6__
Group/Head: / R RC'Sr. Chiei C/____________________
SOP Msr.:- SCOPE
Project VVA-11rS_ BAK IMUCLEFA. ?L4A ý r- Affected Units 0 /iJ Ly
Systemn or- Feature 5 LEF'1/C FOR- A oe x EcEI:Af-Er
Reference& Description ofCha~nge! iJcg S4(22 F=O T1zJM SLEG'LC : L4K '78Z- FLUSH
MIErn4 hJOS-1. SIDE OF U*" Lii.e WALL 0oNe- PT'L-cc~
- SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
REV. CATE PRE- SECT. GROUPBRANCH ECN D.P. DSRPINORESONTOTALNO. ISSUED PARED SUPV. HEAD CHIEF CLERK MGR. DSRPINORESONPAGES
F2 .als as follows: N0J5A.dditicr-a' information:
TVA 10575A (EN DES-2-83)
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN,
ENGINEERING CHANGE NOTICE No. 3511IDATA SHEET NO..(
________ ________________________________ ____ - r
nRAWIN~ OR R/M NUMBERDWG ISSUE DATEREV. EXPECTED ACTUAL REMARKS
N DATjIREV.
7 -- ~ 6-6-g3 5-~6~3 -rg,~i 5Lee~L~
__ 1~ ________ __ __ __________
__________I.___________________________________
_____________ I. _________________________________________________ _______________ _______________
_____ I I__ I _________ ___ ___________
__ 4 _________ ___ ___________
t ~~~1 __________________________________________________________ ________ _________________ _________________ ________________________________________________________________________
I ___ __________ _ ___ ___ ____________
___ __________ ___ ___ ____________
___ I ___ ___ _____________
I j ___ ___ ___________
_________ *1.-.~___________ I
____ 1. ____ _________________
I _
I.
AFFECTED
PAGE
~;Ii~ 92i .WP ~iH013 5U00
O ~ ~ V\ .TFNNI JS C j AitC)FJTli't
D1V!SIOrl 01- EM NCý Ir!. NI Pir: ( D 01 GN
To: (C ti'~tr1Ctrt), ion P t folj c i ,ner
FORE ISStJf,!iF 01 C,11 ui1..:.1 iNG LICF NSE)
k 2r NV~-r 2-of ~-K~jClhx TN
ECN NO. I 28
SWP7F 201 C3-S-
DATE U 131982 __ ( - -~ 2
Was IJ Analysis Require~d: Yes___ No , 7 i- -At . /c C i)
Praqired b'y' /ci it& 0 1 - ~ F ? Leader
___________ L .~~~•~ Releas.ed: Date___- _ LL -/ 2/' ~~~~sign Project MariagerDaeSOE( lc3 O
Project jq4:/15A 6; c -vjIf- Q-__1____- Affected Unit(s)__ _____
System or Feature 75 /v~
Ref erence & Description of Change -Li1 &T'~ •LcI
DRAWINGS OR B/mIS lN4VcLVED:7'Y5 ae rnl-" '' "
or Data rheet Flermral Power Lr-igineering Branches Yes or No
h (Data Sheets Required) No Avail~able Approval Re.4Uired
Thermal Power Engineering Branches
Civil 171X /' 2-Electrical
mecha nical
Nuclear
Thermal Power Engineering Des Project
Civil
Electrical
Mech
Analysis
Arch, Hydro, & Spec Proj Eng & Des
Arch
Civil
Electrical
Mech
CC tAttacriment s).Chief. A'Cil't~ iu ra I iic.Thancl, vv4C 126 C-K
nchleI, Cilvi Engineeringt Brancri. W90224 C-K
Corjel. CIO! Engineeringa & Designi francfl. W3C 126 C-K
Cruel, Eiectric~ai Enoineerifig Brancrh, w8C 3 2 C-K
cnir~cf, Eeictircat Engineering & Design israncn, W2D224 C-K
r,'CL3S, 100 UB-K
EON is ne~f~j~oh review.
De'.~un Pt oject Matn er Dat
________A Appi t .4ed:
TPL Civil Pr< Chief Date
TPE Eiectrie".1 Br. Chiefat
Coie' rNuClegrr Engineer Date
Yes or No
Recluired for PSAR or FSAR__________
Required for Preoperational Test: ___________
if Yes. Test No. 4 2
_________ Vendor BackCharges Involved lo0
Nonconformance Report Required ______
QA Applies e
Scuirily Systemn Modified A
Vendor(s) involved:
Cntef, Nuclear Engineer, W10C126 C-K
Choif MuCroarCal Enuineeriflf Brvflcn, W7C126 C-K
tle, mecnaniclCt Engineering & Ocisgfl Branc't. 102 5PT-K
Crni.f Quality Assurance Prancri, W 1 .C126 C-K
PIanaaer of CuristrU ionr, E71324 C-K
ctilet, Cost Planring aiia Control Staff, W12C74 C-K
Plant SuperIinencieflt
TENNESSEE VALLEY AUTHOR IT'DIVISION' OF ENGINEERING OESI(
ENGINEERING CHANGE NOTICE NO. .L293N DATA SHEET NO.L
Watts Bar N4ucImr.P1apt, Spring QLy 1L3 SPAGES
From: D *_________ __________04________Released By:
I ~ Oe~t9~Er~)~ct Manager
Preparing Section
\ ýPages (RO): 2 R
Supervisor: Rj ~Staff Eng. or2Architect: A/)16
1.11// OvrPgtnn Mana-e
MEDS Acessin f-f
SWP ¶32 0813 501SwP 182 1129 510
swpWP 0202
4jW ~ 0322 513RpWp 'w3 0 412
61'WBP t83 052 0509
520Head: R SWP 83w 0314 52!Branch__________________ __
Chief: DateSCP
Proj ect IAe LsLc,-\(C~~rAffected Units2
System or Feature oX. C, FeJ/vf 74k) •,y• S / MC/ 3 AS
Reference & Description of Change LA 16/, d,4 y Feeclwe'7leo- jSi/s'. ke -i-e V Q ka-o ,r
.0 014dfC4&40( r11e1*4c A 50,0 ce Gcle c/$rr &ft ttýý-e
. cc c ~. 1,,,7 - vaL delex4 0 Aid - / - kt. ec'c 0ý e-/C/' I oig
SEE ASSOCIATED DRAWINGS LIST, REVERSE SIDE
REV. DATE PRE- SET. GROUP RNHECN D.P. rECITINOOTVSO AGENO. Jý%XýPRED SUV. HEAD CIFCLERK MGR.DECPTOOFRVSNPAE
#O - 2fl3 ,~~~ ~ ~ ~SWf 4Vft - A~~--A~ C'
-2 AM4 rT r7 .4 c_ ob~f £Pfrl1 iiAthiS -p 3, y 4 .4-6
3__ 344z~-44*2iI-~4 e e _
4 5-3 -22 4M9 e-,15 k/A~C
7 YIU._____________
i-ieiu Materials as follows:
Additional Information:
CifCotPlanning' and Control Staff, W12C74 C-K Cntructo PoetMnagerChief, Architectural Design Branch, W4C126 C-K Chief, Electrical Engineering Branch, WC2 -
Chief. Civil Engineering Branch, W9D224 C-K Chief, Electrical Engineering & Design Branch, W2D224 C-K
Chief, Civil Engineering & Design Branch, W3C226 C-K Chief, Mechanical Engineering & Design Branch, 102 SPT-K
Plant Superintendent MEDS, 100 UB-KARMS. r4n --'T-i f TVA 10575A (FN DES-1O-81)
m No.
.ENGINEERING CHANGE NOTICE NO. 3/ L3DATA SHEET NO.L
R 59 0-1 9031-"2At
o3~~~~- -*~
'.1.1
a -3 a \ 10 %5"" -% ' l
c36 2-1
~O-vN~4- U.q
.-CM o-&w ~A-
t-U2.-91
PAG E
.53 P--tr j\;-ux 9%
I-2j-Ul t-2-4-T3
9011
d, 3 fs - I A ;-ý - v -71. -01 -% 4"L
TLKNESSEE VALLEY AUTHORITY-DIVISION OF ENGINEERING DESIGN
ENGINELRING CHANGE'NU I IC-E NO..i.L......
DATA SHEET NO.
\fECTEDDRAWING OR B/M NUMBER
ISSUE DATE
EXPECTED ATAI __________________________________ [.....J -~
o3S-iA~='~-g5~ ~REMARKS
V6N20 iZ~ 2~ RR"I /rj £~ L~rIP~ .~~ 47A.J4Z1-ZaI-eO
-Vii
lzr- S'%.i~' 13S.,74 X 22
9
I~~~~~ II'L 909 /~i. 38 ,41Z4~2
--~7- S%4- 1 L -6
C-tsrs S13. 1 )___- ro 2..
3I __ 2-v• Sa -1 2j - 2 ___ 43 _____r-4lA x'-21 a 2
-~'I1)/1+2qoz._________________
4p7s-sI r
__V_7 04/ S42 09 DA 2..
/Vt 0427 962- q 2.
-V7g' rY j -rvA- 1fo A7A4t~-~2A -21
PAGE ~~
V'-n/. xro~ f _______________-_et
7 I 98 1N 2 -Og A27.ý
ill. Io o2-I33o -33i7 ?-
02,
O','.'GREV.UNIT
I
TENNESSEE VALLEY AUTHORITY':DIVISION OF ENGINEERING DESIGN
,LNG INLERING CHANGE NU IFICE NO. 319fDATA SHEET NO.I
DRAWING OR B/M NUMBER
ISSUE DATEDWGREV. EXPECTED ACTUAL
_________________ I-I _ _ _ __ i _ _ _ _
REMARKSh LINE UPO!ý-N DATA5.R.EV. NO.
V~~rJ~ 0 ~ £LF~P ~jj~4..J ~fjf,*
'-, u~-i~'-*-- '. ~I 'U - - ~ L Q vAl%~ -J A;442.-7- 2.o4 -m)
I ~-wI'Z99~ __ 3-10-83
I Z- __ ___8134E
I ------------
2 1- 9 O I Z
I VZS' ~i'l142- 9~ 0 _3 6-83 _ _ _ _ _ _ _ _ _ _ _ _ _ _
9 - 11 S)4, 1 A 9i .q __ _ __ _ _ __ _ _ __ _
I _____ -v2/g'N rm-
k__ 47A42.-_ I-o 0 K 0 SO- 31-3 TV4 Pi?s suppbo gef "
-- 3 0~4 Qr 9 'sa 1- -o-4 sp- 3-I7-~3 - A: L .A _j - -
-i-os Ans11742a V.
L - - -
1 ~ ~ S)4. ~C) 3J-.3I
I -7-04 si -FSO1 2-
-7 ~1'
-~-cI S). Q~
____ -~-o~ ~$ a3 -17-3I
.3-)c4-- SW 3__14_______________
Oa-, cxi I
PAGEj
TLENNESSEE VALLEY AUTHORITY-DIVISION OF ENGINEERING DESIGN
JNIT flRAWINC~ OR AIM NUMRER
FNGINEERING CHANGE NO[iCE No. 3 1
DATA SHEET NO.I
DWGISSUýE DATE
EXPECTED ACTUAL REMARKS
Li 4 -1 A-_t-_2- V.A IRA42--l4- -7 - 3A I0
PAGE s
A~~~AA2.7-~~~~ A& 2- -2 -2.2. g)33-33 8 *" , t.
2-
2-
2..,
d" -2%IV6
--------- -------- --------- -------- ---- o--- ------- 3--.r-----.4--*12-
A-1 oZo.3 H 3Q o__-_____r._________
A- ________IS4________3-1_1__
3~i 271 f? Ajff-fr7
oz A.
3-16-9
NIT REV
DRWN OR~ Q/ NUMBER
-_-1 " 21__ 1 z, 3AcA
.A -1 A Alzý-l - I
I VA I ): i5I (EN UES.J I
TENNESSEE VALLEY AUTHORITYDIVISION OF ENGINEERING DESIGN
DRAWING OR B/M NUMBER
d4 7A42:7 - I -ls A
ENGINEERING CHANGE NOTICE No. 3 1 91~
DATA SHEET NO.__
I ISSUE DATEDWGREV. IEXPECTED IACTUAL
3-3~-12~ 3i-93
REMARKS+
R7D DC60 xel'Apeef Afe.
PAGE
INE UPCAN DqýATA Sý
REV. NO.
__ 1 A 7 -/ l-
47 AS 2 LI6aRC
A-7&(J4A'7-79 J
0__ 3 O3-/aFu)- V22o 0__ m,3 -54 1144ZI -z Ib1 474:7A#-1- 3- it 1
4_ 4'1LYZ7Z2 -
OAJJi A D?10~ V` Ol' (t,~ .
I REMARKS
...............awE l .. ..q.wJýA
............. ................. .......... ... ............. .-.............................................. .... ................ ....................................... ...... ..... ... ....... ........
- -ýFww'z.
:om:....... ...... ......
..... ... ... ... .. ... w m ... M:d........... .................. ...... . ........
:4 .w ,... ..... ..
0 .
.L'/ .
~~ .. 0 . LO06TION P4 AN (~f,
..........
.. ........ 4
...... ..
.. ....... . . ....... .......... .....
...... : ...... :.... "::: L........... .... - ...
2..Fop 6ENViRAL NoriS SEE 47A450-1 I.M7A PIPE CL4SS, C.
I el 3. I4ML YS/S REFERENCES W(rY9) (4)~' ~ISO NO: 47W42 72- 20 6
: -- JT NO: :226
-.-..... 4.......
.....................O............51)
........ ... ......... ..6 ..
... .... .. -- --- S E..S M.C C A T E G O RY.....S T R U C T U R E S
IAECHANICAL-CATEGORV V..::---:*........
~5 '........ ~~ ~ -- U P O T O E .C ..........ISE .E F' ...... ....... .~v, E ..A2S / F- 7 SU P....TIL
6C .......... .AT ................SPVJ 3C AP W TT B R NU LE R
TENESE .... E. AUTO
1:4::: m44 A ......
C77: 7~ .. .................... ..... ---
SMWV~~~~ -- -.-
- - - -- - - - - -. .O .A .S 0 . .S..
ff371~
.................
7:......... .......
* ... .......
.. ......... ...w
=77::
...........7: L:::::
..... .....
..........7: W: ...... . ...
........ . ..... .I --- - 1. ... .: .
FORM 3
WATTS BAR'NUCLEAR PLANTINDEPENDENT REVIEW
10520DIN511310520.92.0000ref: 10520DIN4319
Finding Number I F / 3 / 7 / 2/
0-PL
Comments pertinent to finding:
Support was redesigned per the latest analysis and issued as 03B-lAFW-R237 R903under ECN 3511 on 3/24/83. This corrective action is complete.
References: *ECN 3511Drawing 03B-lAFW-R237 R903
Program Team Member
OEDC Program Manager
~1Y~L Y& ~ (S5, ~L7 oChairman, OEDI; Policy Committeee
/1 /(/FjDate
'Date
Date
Black & -Veatch ~.,$~,
Class if-ication: Type Category o9
'Black & Veatch Senior Review Team Chairman
Date
Date
_rX4 1PO.- 4ilý 4L-J_&-ý
ENGINEERING CHANGE NOTICECOVER SHEET SWP 13 0314 506
(BEFORE ISSUANCE OF OPERATING LICENSE)
TENNESSEE VALLEY AUTHORITY ECN NO. 31
DIVISION OF ENGINEERING DESIGN VlsBar Nucea Plant, Spring Cilys IN
To: Construction Project ManagerswP 204 GB-K
From: Design Project Manager
DATE MA9 141983 MI~J~e ~~I
W-- I I Analysis Reculred: Yes - No...X..
Project Lg 1.1~o Affected Unit($s)M- ______-&so_
6yiPdI wNhhAjV4
63014&~VE3
SystemorFeature IQ1-,9 -SYS 1Z~ 1A
Reference & Description of Change Ebs EXCE7 41 /
V41 r~b ,N-5/.~ 'V/W~7DM. F //6e /0 fO (q-qM 1
DRAWINGS OR B/M'S INVOLVED: Yes Date Branch ENIERGSUPT AME Y
or Data Sheet EprovaIRER SPRequ iKIred(Data Sheets Required) No Available AprvlRqie
-- kn -A- Amnik6nch review:
ENGINEERING SUPPORT $RANCHES
CivilElectricalMechanical
Nuclear
NUCLEAR PROJECTS DESIGN GROUPS
Civil 1)
Electrical 4Mech Z
FOSSIL. MYORO a SPECIAL PROJECTS DESIUN
SPECIAL DESIGR PROJECTS
ARCHIITECTURAL SUPPORT 9RASCN
C ooIEF . ARCHCTIT C AL SUPPOQI G RT S A NCH. WSC 126 C- :
CHIEF. MECHANICAL ENGINEERING R0A2CH.N VYC126 C-K
CH:IEF. IUCLEAR EN GI 1EER.W H0C12A C-KC: IHIF. QUALITY AS$URAR CE RANCH, 5100 MIS-K
No ___
ENS CIVIL 91. CHIEF Dt
E03ELETRICAL N. CDate
ENS NEC1001C11L It. CHIEF Date
5i-V uclear Enginleer Date
Required for PSAR or FSAR
Required for Preoperationlal Test:
- If Yes, Test No.
Vendor Backcharges Involved g
Seismic Analysis Required
Nonconformance Report Required
QA Applies
Security System Modified
VndlOr(s) involved: U
CHIEF, COST PLA-"INGR AND CONTROL STAFF. WtIC74 C-4CHIEF. SPECIA DE IGSPOECTS. W20124 C-9MANAGER OF CONSYRUCTION. LI*2S C-4PLANT SUPE11ITUOESYNEDS. WSNSG C-K
SIEMENS
i st I
T~C~ R
so, SEE- 7VA, 1Mw 47AC~o- I7k
........ ...
5B-lA.FW- Rzos .
.. .. .. ....
I Al.
lb.........O
...........
EL"V LOOKING LOAD.-
'*-I *"" I~Z ...... g LA4ý""*-","""'",,,7: ....
.UL A . .......... .... .. . .
....... A . ....s. . . .. . . ...
DRAVO ~ LEV LOOIN WESTTcl LCTONPA
ORAV CORORATON APC.O# ?289
t v.-A' C,0N T:R-:A-,C -- #Tv 4 C38SM3O5 7
WATTS BAR NUCLIEAR, PLANT-UNIT #I
u 5i~J zS~~ DAT,...
BERGEN-PATERSON PIPESU PPORT CORP.SYTE AID(ILIARY FEEDW~ATERREF. PIPING STRUCTURAL.
DWGS_ 4n7W427-3-10 '4lN318-2-5JOB NP. 364 FAS NO. 009 "EoD
MARK ItS ET REV
I'~~' ~
9,6115x 8 s r TvA 7-1/ e9oo = V/Zwbor( 40-
Ai/~( loJ
t(Ii~j~.~
I.
1***~..4.
z0
UI.,'U
.I
............... ....
WA77TS 5A B 11,1;i -rAR -.-_1ixN'
10520DIN525410520.92.0000ref: 10520DTN4082
~'ndzgNumber / F /3 / 7/ 3
Ca~en~s er:tnemt to finc..g:
NCR WBNCEB8215 was written to address operating modes documentation at WBN.- Thecondition has been reported to NRC as a 50.55(e) item and is being tracked byNRC Region HI. TVA has undertaken a sampling program to evaluate possiblesafety significance of the inadequate control.of operating conditions .used inpiping analysis. That sampling program is scheduled to.be complete by January 30,1984. All items having safety significance will be corrected prior to fuel loading.The cleanup of inconsequential discrepancies is scheduled to be complete byJanuary 30, 1986.
TVA References:
NCR WBNCEB8215Fourth Interim Report on NCR WBNCEB8215
fl-zz -Ss5Ite
Date
1 taiman~, DO-ff PolicyCire
B lac &i Veatrcb ~A''A ~4 9 ... 6I&.'-
Classi.-Fica:t.on: Type 1?Category A
/ ) lack & Vearch Project Ylanager
Black & Veatch Senior Review Team ChiaiLan
Date
1 - Da tre
eMll-ý r"
r
IP LA NT VB N
FRP~EPARER/ORGANIZATIONIDAT
]DESCRIPTION OF CONDITION
0 10 qq
n~rjn ,'. rTL)L~~..J.,2JUZ
* -UNIT -1 and 2
E J. E. McCord/EN DES .CZEBl5-5-S2
Operating Condition Data
Attached.
61 "ATE OF OCCURRENCE EST( ),ACT.( )SIGNIFICANT CONDITION ADVERSE TO QUALITY
-~ - YES N
77 . FflDISCOVERY- -RANCH CHIEF/DATE--.--L~Ji
CODE (EN DES.-EP 8.01) - 17
CORREC~TIVE ACTION:
Review analysis-by implementation of a sampling program governed byv a special engineering
procedure and evaluate. the dif f erence. bet-ween documented operationaJ. modes and, analysis
operatio-nal modes". The CEB Report 76-2 .rill be voided -and replacie 'with the'operational
modes in a QA doct~ent. * .: .* -
* CEB `82. 0707DIVISION OF ENGINEERING DESIGN
NONCONFORMANCE REPORT
ýýCOýRRECTIVE ATO EtATSFO EINCIEI EURMN EO O - -
DESIGN CITERI DOUE'-O XETINRQETN.-
N flvF NR EC O IýSHDUAVAT- ~
W REPORT NO. W7B'
ASSIGNABLE CAUSE: (REQUIR.ED, IF SIGNaalseIFICANTuxliry)uldn
ThaI opertna noe aaued for piping syst aase ith aular bidn
Watts Bar Nuclear plant are not docum~ented. The operational mode data for reactor
piping . as generated by EDS Nuclear and issued in Civil Engineering 'Bra'nch ~t 7
In the above cited cases, a procedure did not exist to assure that revised w~as
Cor effects on previous issued analysis.
* THIS IS AGENERIC CONDITION YES[D NOE
I8 ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
* Docum~ents concerning operational modes yill be maintained -as retrievabl%~ etliýs
acro-rciaflce with TVA'.s Quality Assurance 'Programl. When a reanaly7sis ishei.eti
%rill require trie operational modes to be =c-xiewed and QA dor-unented. Revision -to
*.operational modes will cause the QA docum~ents -to 'be .rev-ised.
.............. ..............
j 2 ACTIVITY NO 2 TASK DECRPTION DATE INITIATE
NC a rtpdon this form to meet the latest revso of EN DEs-EP 1.26.,
This supergedes CE.B 820507 007.
SDISTRIBLMrON: ALL EN DES ACTION COMPLETE:
EON ST PROJECT MANAGER - . RNHH
EONDST PROJECT MANAGER-BACCH
MEDS .
-v '7' .. .
NSRS (for SignKtwito NCR's) ... ....- -. .
DISTRIBU`TE AFTERTH't.iS. IGN-f. A.T URE~*
-A 4___ Operating Condit ion Data
The Quality Assurance Criteria 10CFIR50, Ap~endix B, section MVI, states,"Records shall be identifiable and retrievable." Also, section Ifl States,"Measures shall be establish~d for the -identification and control Of designinterfaces and for coordination -among participating design organizations."These measures shall include the establishment of procedures among
participating design organizations for the review, approval, release,distribution, and revision of documents involving design interfaces.*
The operating conditions used in piping analysis are based upon datarequested from organizations outside of the Civil Engineering Branch (CEB).The thermal and seismic design basis "source" data is not .in all -casesidentifiable as being current, valid data and in some cases is not',
available. No engineering procedure exists to control revisions to .thi'sdata,-i.e.*, assurance that the analysis is still valid for current,operating conditions.
Also. piping analysis has been done by CEB personal service, contractors whohave assumed that the data previously shown on the piping isomet-%rics isstill. valid. They have signed off -on the aunalysis checklistL-,- item I1I,Checklist 1 - Geometry Check, 3. Isometrics, i (check that design andoperating mode table is shown and correct) without verification that indeedIt is still current and valid data.
*The report which contains operating mode ,data for inside containment (CEBreport 7 6-2) has not been maintained to reflect errors that have beenobserved -in the data. As one example the report does not indicate the140 0 F operating .condition for analys is problems 0600200-02-05, -06, -07,-08, -05-01., and -02.
032113.05
TV4raz
VY'~TT.*r:ý oTATES GOVERNMKENT
Memorandum TENNTESSEE VALLEY AIJTHORIJCEB '8310 18 0 0 1
John A. Raulston, Chief, Nuclear Engineering Support Branch, Wl0C126 C-K
FROM :R. 0. Barnett, Chief, -Civil Engineering Support Branch, W9D224 C-K
D)ATE OCTi1 8 1983
SUBJECT: WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - OPERATING CONDITIONS USED IN PIPINGANALYSIS - NCR WBNCEB8215 - REPORT 4 (INTERIM)
The information included in the attached NCR and the interim progress belowshould be used in the preparation of a fourth interim report. The fourth
interim report is being submitted because a sampling program is still in
progress. A final report for unit 1 will be sent to you by January 30,1984.
Interim Progress
The guidelines for the sampling program that governs the operating modesused in the rigorously analyzed piping problems for the various piping.systems have been set forth in EN DES-SEP 82-15. The operational modes,.
data were compiled in accordance with Mechanical Design Guide DG-M5.l.l.
CEB is conducting the sampling survey as follows:
- 1; Twenty rigorously analyzed problems were selected.4
* -a. Zighty percent of the problems selected are common to units 1 and
2, unit 1 show-n, unit 2 opposite band, or unit 1 only.
*-b. Twenty percent of the problems selected are from unit 2 only.
c. There is one problem fro m each of the systems which has rigorously
analyzed piping. At least two problems each in the reactor
building and auxiliary building have been chosen. Only one problem
:each in the essential raw cooling water (ERCW) pumping station and
the'control building has been chosen.-
See attachment 1 for a detailed listing of the problems chosen in the
sampling program. New operational modes are being generated and compared
to those used in the analysis. The differences in the new oper~ational
* modes data and the analysis data are being evaluated on a pass-fail basis.
Decisions may be based o'n engineering judgments using the guidelines set
forth in EN DES-SEP 82-15 or by reanalyzing the piping system using the new
operational modes data. Qualification of the flanges, nozzles, and
supports are being considered in TVA's evaluation of the effect of
operational modes on the piping system. If any problem fails the sampling
program, another sample will be made of that system. This second random
-sample would .consist of the larger of 10 problems or 25 percent of the
- problems for that system. If an additional failure is found, a 100 percent
- review of that system will be done. Most system operational modes data are
similar in nature. If a failure occurs, similar discrepanices are more
likely to occur within that particular piping system.
John A. Raulston
OCTi1 8 1983WATTS BAR NUCLEAR PLAINT UNITS 1 AND 2 -OPERATING CONDITIONS USED IN PIPINGANALYSIS - NCR VBNCEB 8215 - REPORT 4 (INTIERIMI)
Operating modes data for all pipe stress analysis pro blems will be formallyreviewed' and documented beginning September 1, 1984. The final review. anddocumentation for both units is scheduled to be completed by January 1986.The sampling program should be sufficient until the final review has beencompleted since the fatigue life is based upon 7000 cycles, of which only afew cycles would be experienced during this period of time. The samplingprogram is scheduled to be completed by January 30, 1984. Attachment 1lists the status of all the problems included in the sampling program. Thepipe stresses for all the test runs were within AS.1-E Code allowables.
Two flanges in the safety injection system. problem did not qualify. Asecond random sample of 10 problems in the safety injection system havebeen ricked and are currently having new operational mobdes generated.
~ROB: SSL:TTAttachmentCC.* L. J.
MEDS,R. M~.M. N-.J. C.
R. 0. Barnett
Cooney, W6D224 C-KW5B63 C-KPierce, 104 ESTA ,KSprouse, WllA9 C-KStaridifer, 204 GB-K
Principally Prepared By: S. S. Lortie, Extension 3627
ATTACHýENT I
WATTS BAR-NUCLEAR PLANTRIGOROUSLY ANALYZED PIPING PROBLEMS
FOR WHICH OPERATIONAL MODES DATA WILL BE DEVELOPED
SYSTEM
MAIN STEAM
AUXILIARY FEEDWATER
BLOWDOWIN
AUXILIARY BOILER SYSTEM
REA CTOR. COOLANT SYSTEM
HIGH PRESSURE FIRE PROTECTION
SERVICE AIR SYSTEM
CHEMICAL & VOLUM!E CONTROL
SAFETY INJECTION
ESSENTIAL RAW COOLING WATER,
COMPONENT COOLING WATER
CONTAINEN T SPRAY
RESIDUAL HEAT REMOVAL SYSTEM
SPENT FUEL PIT COOLING
UPPER HAfl INJUECTION
RADIATION MONITORING
ICE CONDENSER
HAVC
a) Evaluation completed andb) Evaluation completed andc) No discrepancyd) Test r-une) Evaluation not complete.
ANALYS ISPROBLEM NO.
a 0600200-06-01
d, e N3-03-4A
a 0600200-07-01
6, e N3-12-O1A
a
a
a
d, e
b, d
aa, d
c
a
a
a
a
a
a, d
d, e
a
0600200-13-05
N3-26- ZR
N3-33-OlA- -
0600250-08-13
N3-63-05A
N3-6 7-04AN3-67-06AN3-67-15A
N3-70-34A
N3 -72-02.A
N3-74-03A
N3-78-08A
0600250-15-02
N3-90-06R
N3-61-lR
N3-30-IR
ISOMETRICDRAWsING NUJ1-ER
06200-06-01
47W427-201
47W400-208
47W43 1-20047W431-20147W431-202.
47W46 5-209
47W49 1-208
47W49 2-200
0600250-08-13
47W435-202
37W20 6-3047W4 50-20847W450-233
47W464-232
47W437-!200
.47W432-206
47W454-205
0600250-15-02
47W600-407
47W462-100
47W915-100
acceptableunacceptable
I
FORM 310520DIN501310520.92.0000
ref: 10520DIN4334WATTS BAR NUCLEAR PLANT
INDEPENDENT REVIEW
Finding Number /,C/3/ 7141
Comments pertinent to finding:
At the Black and Veatch inspection, construction of hanger number 101 cwas not complete. The hanger was being tracked as incomplete by the construction
accountability program. Installation of the hanger has now been completed in
accordance with the existing Quality Assurance Program and tracked with the site
accountability program. Attached is a copy of any additional field change requests,
Quality Assurance inspection documentation, and accountability print out.
Program Team Memb'!\.j
OEDC Program Manager
airman, 07 Policy Committee
Date
Date
Black & Vac
Classification: type _____________
Black & Vea7tch Senior Review Team Chairman
Category _________
Date
A1Date
I/ 11a-c & Veatch Project Manager
sot#SW.**# 0 000 0 * *0000 9~*.'~ ot5 ,* V.A*tAt4 .. 0~tat5~ .. ~S~cfu**,toW** .. .. . ... r .Ar. ..
II M~ -~
I~vs.. i-~
J .~fl - (.CJ AIUJ
1 -414~.21 '1 J.'m A. j
J.JJ.U S 1~**I II~"*Z I * I/c. "I " "I
/OSIH-H/t
/ICli-H/C
A*w7 !-7 Thi
,r g77rr*T~j )] 3 14 jw, Ii V I4' 114 .-ý 3 4 14 4 -UULG
1.2' j z Ii . 1414 21 ')C'4 .)H14 0* 0 Y 1& .'qA 07A413 F2 09AýI I I-I L
I b- I J b b(i Hi A0i -i 1-41W421 219 qc * II'4. -I A 'G4 C IA* O de* 0&a O 91*I 0_3L" I. - ý .a - 1 F 1 AUG -2 1-41%4zLl.-Id ý'U.l i) 11 1~I 4 Fil w [JII V L 341. ~ vW. 111pw T aI 5
c;jtI I z- E4 7w4 1 .. I 119 9cUVC * mUI 0'A A- !R U- (* 3 4
I *f' 12 11- 41W427 :1 '3 C10 c II!CIA*
/iLt- -H/C-f ZI ''I i Iv tVI-A * l
L 41:4Z21 -1 ý2. I~ 'j -Cin 'A
/I fW4 I -21 VI W
I "Ji j- .L IL -14 hJJ...I I IfI'~ I-- W;. **'* 9i U I* ou - I ll
/14H -/II C
'XJb- J, 2..... 1Jju~ -416.421 atl q HK A 3'3 A4 t1 04iA-~~~~L- L.JZ I~ UJi .1 U9-J1 u12 E t ~ 1 13, 14 Fll WA..U
L~1JS 3 U ~ 'JI U JU. 13I J~i (P'q oi ý 1' 21' 1 '.. u ' Cm;
Zý3- ýa .)Ji ' ja .l'jjOb3 2-41W421 11 CJ (11 HM A n14A 0 7 0~AAZ;- -3 V ý- ) --%I V ýZ-7"01lm .i o u )(
L Z a Z ~~~ fu' -. " AI . 11
-=NE
r ;UJ.IL Z
. .. %t A I .L )L. ':'j
0 > IS - fjfj
jlju_ý e
I tIv 'I A- "MU. Ots- 1184 W.3Aýluj 1ý
FORM 3
WATTS BAR NUCLEAR PLANiTINflUENDEN'T REVIEW
10520DIN522210520.92.0000'ref: 10520DIN3087
Finding Number /F /5 /0 /2/
Comments pertinent to finding:
Corrective Action Required:
The FSAR has been revised to reflect the use of the 23 mass point se'ismicmodel. This change is documented on pages 6, 16, 17, and 19 of J. A. Raulston'smemorandum to L. M. Mills dated August 6, 1983 (NEB 830809 252).
TVA References (ECN, NCR, CTR, etc.):
FSAR Revision Transmittal NEB 830809 252
II- I-,B3ate
Date
Date
7"4 AA~ c-t4 f4 eBlack &Veatch ~ .,z , 4
Classification: Type ______________ Category _________
Date
Black & Veatch Senior Review Team Chairman
OEDC Program Manager
(A72li~ & Veatch Project Managerb). 9 -I zz"ýý
. /ZZ
IVA l7II tSHdwo-es)55
UXrflD STATES GOVRNUENT
Memorandum TENNESSEE VALLEY AUTORMT
TO L. M. Mills, Ia&mger of Nuaclear Licensing, 40o CST-4P_ EB '830809 252Fr"N John A.. Rauleton, Cbief, Nuclear Engineering S9pOt3?Branch
DA 1 OCZZ' CEC 9OJUd 2 X 12 8 0DAT A6 5J ~1983
SUN=UC: 7"~ Aft. >kd.(A"%o1' tLb - MSR REVIS ION PACLAGZ 146.
Attached is TSAR Revision Package No@. &A-Ž The package contains
approved OKDC design input in accordance with ANSI A5.2.11 forincorporation into the TSAR. As such, the material should not bechanged substantially without the prior written approval of NEN-NfLS.
If you have any questions on this matter, contact__________at extension '7171
Attachmentcc:" 6 SD 3563 CAK, Wall attachments except figures
Principally prepared by . . . extension 7
0105 ;ISAR.1f
in... Buy U.S. Savings Bondi Rqularly on the PayroUi Savings Plan
0ý
WBflP ý FSvz.
A time-history analysis of the same beam model was perforrmed Inorder to develop response spectra for equipment attached to thecontainment vessel. Four artificial earthquakes, each havingarn averaged resronse spectrum, greater thar. the destgn responsespectrum provided the seismic input. Using each cf the artificialearth;ua ke s individually, the beam model was analyzed and historiesof~ acceleratlcr. were generated. For each cf the accelerationh istcr.es, resr--nse spectra for various mnass points and valuesCf assumed equir-en t damping were generated. The desirn srectraw:ere the ernveic-es cf the spectra igenerated frcm the "cur earth-quakes. These calculations were performed ty CL'&I ccmputerprcgram-s !,^17, ::LL, and !~668, all tf which are described in.Ar~pendix 3.FC.
SNcn-Ax~sy7rm7etr~c Lrsu o Lading~ Arnalsls
-he ncn-axlsynmetric cress'.z'e Icardlrg (*:ASFL) results from anssmdsudden ruptu.re in the reaz~tcr ccaDlart system. 7he asso-
clated press-_re loads are dynamic in na-_;rp and v'ary with timeIn.......e circumferential an~d rmerldiarnal directions in the
vessels. The loads are r.cn-axisymnetric fcr a shcrt period.uminnatinz in .uniform irnternal cressure throun-hcout the contain-%ellt. :cor anal:. sis purposes, the ccrntainment was subdivided
.. rt-n-Ine vclumes arnd pressure-time histories determined.c ahvolume for the postulated ru::u:'re, i.e., each treak in
the eac crcoolant system. pe ressure histcrles for each ofthe ".clum.es were c:.-.-utcd ty. the WestInghou;se Flectric Corporaticn
slgthe cý-4e netwo--zrk dccu:-.;ented In Section 6.2.1.3 rigures..-Cand 3." .2-11 sho.-s the vles used to character!ýze
-he nressu.re in the ccntalmm,-ent.
vrmoanalyses ...ere mnade for twelve treaks in. the reactorplping, sIx hot leg and si~x cold leg breaks. Two separate
and dIst-Inct _a:alysis-7methods were -used In theŽ desIEgn process.-'-e overall vescel resprcnse -.,a!- de-emminod ty a d:. r-mic annalysis.reatinc -h vzel asal-umed m7ass cant!!-v.er ten- and by 3
...... ....esl w..hch -_-nsidered ýYe Offct of. cnvitraticn 7cdes.
1. Eeam Aýnal.sis
7n te Elu-ned mass team7 nna>.'sls, each '-ass rerresentedthe mass or the vessel ~_.c--:-.~d attached -asses.
.ecano~llve- tca-. model lcae *.:Ith the foroýes from-.the MAS. the fcrct:s *~o*- vdinto rin-d Y ccomp.cnents
-_Prl~ei: as -ao:-----'n -1--;,-----n the north-south and
ag j,4 e e14emf 14-deq1',O e 7-vyc4 .cc-A-"cc rq~ d45ed -sde _'4eu
cj.ýcd &P. 7,14 _(z.,
1 -d 1 As,'e-c i A -4.- ~.Uls ASeSee,,2Cf.: b ^T~s.ss I',".,Ae4 01nn-S de icc/ I shoo.'. ;n
A.2 nee-/ti 4l~Seih .o! ..- .,d 1'r2die 3 .. rewcie/y. ell
TAIILF -3.8. 2-. 2ELEHENT PRIOPERTI ES
El 4,176,000 K/Ft2
G-1,670,400 K/Ft2
INorth-South m
of In ciaFtTta
68.7 x 10375.3 x1075.3 x 103
68.7 x10
68.7 x 10374.7? x IC74.7 x 10J743.7 x 074.7 x o74.7 x1074 .7 x o74.7 x 174.7 x 1
64.5 7 10354.0 x 103
22.8 x'103
13.4 x 10340.5 x 018.2 x 10
otion East-West: motion
Shear of Incztia, ShearFactor Ft Factor
.1emeoit,No.
Length,Ft
1.006.226. 508.009.0011 .009.50:i.506.004.505.009.509.509.509.503.502.50.12.00
12. 469. 549.009.003.00
'ý4
A~kn,'3
ArVa,Ft
41#. 5545.5545.5541 .5541.5541 .5541.5541.5545. 164-5.1645. 1645.16145. 1645. 1645.1645. 164 1 .3u41 .30411.3024.4024. 5024.4,628. 23
68.7 x 10375.3 x 10375.3 x 068.7 x1068.7 x i0368.7 x1068.7 x1068.7 x1074.7 x o74.7 x1074.7 x 1074.7 x 10~74.7 x1074.7 x o74.7 x io374.7 x 10368.3 x 10364.5 x 10354. 0 x loj22.8 x o13.4 x1040.5 x 10218.2 x 10
CotitrtFt
137152152137137137137137146914914914914914914.911,9
137129108456268
36
¼II
TABILE 3.8.2- 3HIASS POINT PROPERTIES
Total Weight, Additional Weight,KjRLK - -iiP-S
91.87147.60227.64393.4',335.23424. 10220.28158.12310.98145.52222.08407.87295.51318.18216.8969.60
192.21302. 84183.10114.66155.6784 .0023.25
12.35.7
73.66220.39131.64.215.4287.9756. 11
194.8140.4261 .65
197.6685.30
107.9773.065.43
45. 1554. 780.03.6
47.719.322.5
Weight Momaent-of In~rtin
K-Ft2
305 x10491 x 10 3754 x 1
1,301 x 10 31 108 x 103I1,402 x 1
728 x 1523 x 103
1,028 x 10481 x10734 x 103
1,:0349 x10977 x 103
1,052 x 103717 x 103229 x 10O3630 x10933 x10485 x 1
227 x 103192 x10396 x 102106 x
10
North-South Motion. East-West MotionEccentricity, Eccentricity,
Pt -Ft
0.02.430.9950.0
-0.0330.57
-1.53-0.820.991.230.25
-0.13-0. 105-0.052-0.075-0.0360.00.00.00.00.00.00.0
0.02.430.9950.0
-0.0330.57
-1.53-0.82
0.991.230.2 5
-0.13-0.105-0.052-0.075-0.036
0.00.00.00.0
.0.0'0.0().0
11: -i -!
Mn~sPoint
No.
A10V1%1.~
ELMIT NO.) rL L IGT
I ~ 15PL' 9 248
2_ _ _ _ _ _ _ 2.0
16419 ~9.546
12
-01169.5'
EOMTHATC 9.5'
I(EL 76 . 2 9 395
@ ~9.5'
PERSONAL A LOCK @ 9 .5
EL 76.02.7813851
6.5'
EL 702.78i 0 1 1_____ 6.2188,
A ~FIXED I
57'-6" INSIDE RADIUS
F.IGURE NO, 3.8.2-90SECTIONAL ELEVATION OF STEEL CONTAINMENT VESSELAND LUMPED MASS MODEL FOR SEISMIC ANALYSIS
'I.I
CRCMFSTIFFENERS:
STIFFENERS:
10520DIN212910520. 15.1000
TELEPHONE M EM ORANDUMDA E J u r 3 , 1 8
(TO0) (K H.E. McConnell -TELEPHONE 615-632-4450 TIME 9:15 AM X
COMPANY Tennessee Valley Authority CC: H.E. McConnel, 11T
RECORDED BY -L.J Zidziunas L41A R.F. Blaisdell
PROJECT WBNP - Independent Review-PROJ.NO. 10520 PDCA/File
SUBJECT Finding Report Responses -FILE NO. 15.1000_________
I called Mr. McConnell to discuss the following findings:
1. F300 -The original finding was issued against drawing 47W854-1 Rev. 8. The form3 cites other drawings which have been modified. Since BSV does not have a COPYof the 854-1 drawing and theirresponse forwarded only partiil Ar~wift`ng..cooiesg w-lare .-unable to -relate the information. .Please provide copies'-of drawinr, 4717354-iRev. 8 and the current revision of the drawing which shows the changes. Also,provide copie .s of .th .e 47W803-l,-47W401-7, and 47W401-9 drawinc~s which show thearea where the changes have been made.
-2. F502-- TVA submitted internal memoranda indicating that the FSAR change had been..requested, but did not indicate that it had been placed in the Commitment TradingS'ystm or if the change had already been made. Additional information is requested
3. F925 - Tere are still some discrepancies in time that are unexplained. This maybe dio to delays in communication between the site and office. Please look intothis and provide input._
4. F976 -The partial drawing forwarded by form 3 does not contain sufficient drawingarea-to show the change. Please provide a copy of the full drawing.
Ho"mer indicated that he would be sending a r'evision for F894 concerning the checkvalve size.
I advised Homer that I had been in contact with Mr. G. Beasley late last week and"ha& -made arrangem .en Its _t .o _r .e view .-calc 1ulation s .1for the F508 response. - Copies of thecalculation were to be sent to -6V along with data in support of actions taken ontfhe DRR 1ifna - - _-
Tinf~omr th~i~f This '4,Tft~i fidhs~r-oti l ots taffiidfiiiAnd -abrief status of each was provided.
I made arrangements for R. Gross to call him to discuss G901 at or about 1:00 pm.KC time.
12: 15~ - --- -----
I returned Homer's call of about 10:15 am and we briefly discussed F718 and the-information needed--to put the response-into-perspective.--.Homer ~idvised that-progress on F502 had passed the''point-of pro-cessing req..xiri-g a---CTR. fhe information provided was that which was sent to those who actually do theFSAR updating.
(TO0) &W)-
COMPANY-
RECORDED BY
PROJECT-
SUBJECT
H.E. McConnel.
dzsný
Homer indicated that our letter dated December 16, 1983 (10520 DIN 1054) had listedF329 in lieu of F328. I confirmed that this was an error and indicated that I wouldadd a notation to our next transmittal acknowledging the error.
j pd -
-RECEIVED &V\-JAN0()4 1983ROECT
TELEPHONE MEMORANDUM
2 DATE 133
1 TELEPHONE __________ TiME 9:15 AM)1
CC.: _ __ _
_PROJ. NO.________
FILE NO.______________ __ ___
FORIZM 3 10520DIN511410520.9.2.0000ief: 10520DIN3165
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number IF /5 /0 /3/
Comments pertinent to finding:
The project manager's remarks stated: "Although the TVA position isreasonable, 'hatýd evidence,' as required by the project instructions,was not submitted to substantiate the claim. Classification istherefore based on our inability to confirm the position taken by TVA."
The following is an attempt to provide "hard evidence" to support thecontentions made in the attachment to form 2.
(Continued)
/J - r- er3Date
Date
OEDC Program Manager
~~4NY5 ~ \~ ~Chairman, nDC Policy Commtre
Black & Veatch
Classification: Type A
,/ BŽ9k6 9FVeatch Project Manager
Cat egory I
Date
DatiBlack & Veatch Senior Review Team Chairman
Cý _fJU
Evaluations of the TVA Form 3 Comments
F503
The form 3 information has been reviewed in conjunction with the informationsubmitted during development of the original Finding package. This reviewindicates that although absolute confirmation of response spectra used is
not available, sufficient comparitive information is available to reasonablyconclude that appropriate response spectra have been applied...
This item is considered to be closed out.
FORM 3
WATTS BAR NUCLEAR PLANTINDEPENDENT REVIEW
Finding Number F503 (Continued)
1. Format
It is clear from the description of the original finding that thejob ran. Therefore, there could not have been a change informat.
2. Base Acceleration
Attachment 1 shows an SSE spectrum for the average of the fouraccelograms. The plot was taken from a TVA design criteriadocument as seen by its title. (In the FSAR, the spectra areplotted to a minimum period of 0.05 second, which does notapproximate the ZPA as closely.) The ZPA from attachment 1 at aperiod of 0.03 second is approximately 0.23 g. This is equivalentto a 1/2 SSE ZPA of 0.115 g.
Attachment 2 is a copy (taken from microfilm reel 6771, job 418)of the results of the subject analysis. The maximum base (masspoint 1) acceleration is seen to be 0.119 g. The agreement iswell within our ability to read attachment 1.
3. Vertical Spectra
Attachment 3 is a copy of the job control language for thevertical seismic response and spectra generation run, also takenfrom microfilm reel 6771. As seen, this job read the sameaccelograms as the job in question from disk file EQRECORD.Attachment 4 is a portion of the results for this run, showing a0.31 g spectral peak for mass point 3 with 2-percent structuraldamping at a period of 0.15 second. Attachment 5 is a plot of thesame spectrum taken from CEB Report 81-4. From attachments 3, 4,and 5, the contention of item 3 of the attachment to form 2 can beconfirmed. Similar comparisons can be made for periods other than0.15 second.
4. Limited Access
The reviewers have previously confirmed that the records were readfrom private disk files (attachment 3).
2
013311.01
q(Pv-
FORM 3
WATTS BAR NUCLEAR PLANT
INDEPENDENT REVIEW
Finding Number F503 (Continued)
5. CBI Comparison
The CBI results are based on the response spectrum method using
the site seismic design response spectrum (attachment 1).
Consequently, a comparison with the subject analysis would only be
approxima te.
6. Summary
The additional information submitted in support of items 2 and 3
should be sufficient to substantiate the claims of the attachment
to form 2.
3
013311.01
____ I DYNAMIC I
100
0
z
3-0_jwa
0.
0
ARTHQUAKE ANALYSIS OF CATEGORY I STRUCTURESEMBANKMENTS___________ _____
WB-DC- 20-24
7X/~ 7-'' FJKIN \ yIT 77 A' FN INV N\ Yt 7 / X_\\I N X\1,_"ZAVERAGED RESPONSE SPECTRUM " \k
0 (4 ~ARTIFICIALLY- PRODUCED ACCELERO GRAMS)- ' V s
40 40
:t;SITE SEISMIC DESIGN RESPONSE 8
6 /
44
.40
.06 I/ )f\
0* Lh.J. , I .i ~~ t I.1 ,, ,11 1.1 1 211 .1 1,1 1, I I 121.1, 2 I
.0 .02 .04 .06 .08 .1PERIOD (SECS~) .
2 4 6 a 1o
CRITERIA ASAFE SHUTDOWN EARTHQUAKE
DESIGN RESPONSE SPECTRAROCK - SUPPORTED STRUCTURES
2% DAMPING
Figure 3
TVA 10535(EN DES-7-77) A±+facrent' I1
, ~
-J12E-,,iHJI b I4 oE-67
1, .5500
13.550013. 550013.5500
0.10624.E 00J.10624E 000.10624t 000010624E 00
7o45007.45007.45007, 4500
0. 17102E 01
0*15326E 000. 70741E-02
it:.PONSES CALCULATED 1901 TIMES
WONPS6VIRAN. PLUS TORSIONAL RESP. MODE_1-3 ItOAMP 1/2 SSE
X&AN AVfAA4vt OF 4 EARTHQUAKE RECORDS t
ME AN'DIP LECTIUJ4
0.00Ca 60**6E-04ooi0*17 ?6E-0L.Qo. 5815E-0J0. 1376 1E-0t.
Go26600E-94.0.36199E-02
C .466701-020.46269E'-02
0963S4I1-02
STANDANO -- MEAN ST ANPARO, 04EAN *
D&VIATION ACCELERATION DEVIATION "0O4ENLgo0 0911672t 00 0918316E-01 U&1I'VE 061O.5UL111-05 0.118*61 00 0.18336E-01 ".rlfY-WiUe,34600E- 4 0.12335E 00 0,15823E-01 0.188421 060.67433E-04 0.133721E 00 0.116751-01 0.17491E 06
O.116910 Q.12Lk Q- 0.AfE -... 0915039E 060.16797E-03 0.203561 00 0,125341-01 0.1*0251 060 009j.2kTI- 169.731 060.297111-03 0931*6@9E 00 0.23156E-01 0.101121 06
fl~iQ~~-0 0.l451 0 02*8731-01 0.948671 05
STANDARDDEV IAT ION
0.165351 0S0.16364F 050*1529SE 050.141881Ooa12634E.0.1135210.96009E.0.81742E
0.35549E-03 0,366*44 00 0. 279501-01 0.84*451 05 0.66297E0.3819SE-0 038..9¶8QL900 0.30462E-01 0. 771 75E OS -~0. 62420E0.41117fE03 0.41559E 00 0.333991-01 0.69359E 05 0.56126E
_ 0..39UTEO 0.5 5392.1 Q5 0.44692E0.31792-03 0.513131 00 09438656-01 0.43254 0S 0.351231GoS6?7aE-03 0.S61221 00 0.47ME3-01 0.325791 05 0.26524E
L 6 0*795SSE-O 0.6W471-03 0.606761 00 0.507701-01 0.236201 05 0.192681 04,17 0.126461-01 0.631 15E-03 0962280E 00 0.520171E-0 Do2 Yi!3F 05 0.169901 -0-4
'l. 16 079136E-02 0.6431T01-0-3 0.6344SE 00 0.529361-01 0.108651 05 0915437E 04__9o.IS90SE-0i: 0.697451-03 0.68?59ECO0.57259E-1 0.11129F OS 0.91448E 03
2 7~0 C.9ZZ5i 2-020.**5-3 .373 00 0.614961-01 0.566321 04 0.468631 03
ME ANSMEAR
0.20794*1.0,20633E0o20163E0.1957510.16532E
0* 0.17335E-04__0..162011I.04 0.15632104 0.14701E04 0.127771E04 0.11237F
0.9*306dE~Jo. 8'1049i0.767 0
0.6447 20.437081 030.30280E 03
*22 G.101831-01 0.82540E-03 0.61293E 00 0.662141-01- 0.063651 03 0.71546E 02 0.214451 03
23 ..9±19 77E-01 09857146-03 0ft.L .SE 00 0o709661-01 0-.5 66771E 02 0,486*31 01 0.894641 02E4Z16s 0-i .966*901-jF.853 I1U00z 0.71631E-01 0.0 0.0 0,19559E 02
004II QQ15t90 0309 6 -01.O0
-26 C.42762E-08 0.2728*1-09 0.118721 00 0.18316E-01 0.14?767 03 0.943*7E 01 0.027 0.6065gf-08 0.51*701-09 0 1167ZE 00 0,1831&E-01 0,14760E 03 0.94218F 01 0.026 0.11.7551-07 0.734661-09 0.118721 00 0.16316E-01 0.106091 03 0.66606E 01 0.00;1_k...,-139461E07 0.8~594E--09 0.116721 00 0*18316E-01 0*592241 02__0e.6.36951-01 0.0-30 01*1-7 011*-S 0.111721E 00 0.18316E-01 0.574161 02 0.624*51 01 90.0
ItLC149965E-07 Go.35Z6E-0S 0.116721 00 0.163161-01 0.57917 02 0.60641F 01 0.0-32 0.192531-07 0.14218E-08 0,116721E 00 0.163162-01 0.275801 02 0.122991 01 0.0*33 C.215111-07 0.1566*-06 0.116729.00 0.16316E-01 0.94969E-02 0.742461 01-PA --34 C.2*633E-07 0-17910E-08 0.116121 00 0.163161-01 0*1U517E
~5C- P02E-07- 0. 1961.76-0I 0.,116721E0 .11EO.0IS3*36 e.27668&E8-07 0.20264E-08 0.ll1672E 00 0.183161-01 0.216751
~ 11722 0 0.6).LOL -,A4649f36 C.2563*1-07 0.201056-06 0.118721 00 0.16316E-01 0.260121
4 0 0.257171-074 1 0.257521-07
4 3 0.-o262461-07*44 0.264151-07
S46 O.266311-0747 C*2*561-07
:.&20780E-06 0.118721E 00 0.18316E-010,Z093 LE-O06 1 2 00 00,1631-6E-.01
04136106 .-118121 00 0.16316E-010,~220-941ý-06 0-.O16721 .00 D 018316E-010.22506E-09 0.116721 00 0.16316E-010.22846E-08 0,118721 00 0,18fl6E-010.230*51-06 0.116721 00 0.18316E-010..23113-0.8 0- O.1167.21 00. 0.18316E-01
0. 6 1701_0.7555010.60863F-093491510.17137E0.372Q4F0.15274E 000. 70432F-02
0.100241 02 0.00.110371 01 0.01049142F 01 0.0
0.372 10 .
00160181 01 0.000.101501 01 0.00.335001 00 0,00. 167791 00 0.000,61663E-01 0000,41*381-0 -96.00.72502E-02 0.00.33428F-03 0.0
Atto~c4,en1 a
46
47
3.38003.38003.,3-8) 0-3.3 800
0.0 (
0.0
POjINT12
~.1~.
0.872?8F 00
----
38939E-02 1236 -03 003454E 00 006690E ol?@56F
069?54E-04
)9 C,2S?04E-07 0.20596E-00 Oll@72E 00 2.1 314E-gl 0*13294E
45 CoZ6552E-07
-3. i%.a4 5t-6 01-o.2q2*be-Q7
' ' A' L2 L C T I1~ t P .= *(LA
L r 7
**~ L * E LLAZL A S 1T ~L.T TAL T 1 0 L;~ I LL E F k S TLj .
'L I
/1 LA-.-;LL:ELLAELL1.,,*T)*//FTr(2Ff.2 n." bf.! T=! ý I, ýL ' -AT 1-='R'CI)9 v tRII f LNZSY Ll.[ S 7 c Eit x idZ 79 E."F.COR:) 9L At:LL 9 9 1 ) -qd
NE O :t. L VT L ) 9S AC E =(36,'4(2GCqjO) ,RLSE*9,'UUD)*//FuF00jI rL !YrJT=A//F707vrOC1 rL~ SYSOUT=P
II LAB:L=4,NL)9DCý.*FN=2t /Fyf5rooi DL fhUNAML zI NFLU.T
/ISPCCTP(A PIkcr/ISTC EytC
S I/F TL4F(nI-GCE' UNI.IT=S Yý PLUCq LHCj7PEC !-ES2K17:sEI ALE= (31624%(2 t %I ),9PL.SE 99FOUN.L) qD! SP:(,DELETE,
I /FTOiGFgIl 01; SYe0UT:AI /FTL9FDC 1 01. UK] TzTAPF9voL=(F'R IVA Tr *Rry 6iNo SEp::3bs,) 0 1 SPZ(CLD ASS)o11 DC =CDE N=2 9 lSNIZZ CC* ISTOP Y,9L APEL= (&LAPE.L 1 ,IN )*I/FTiDFODI Di.j UN1T!ZTtPEVOL:(PRIVATERETA1N,-ý~r107
87lDISP=.(,PASS),o i Ce £RrCF~! ES .L rCLz6 04ELKSIZE:3392,OEtN:2),OSN=SPCR11 LAPEL=(LLABEL2*,,OUT)
EIAI/FlT5FG0I DE) DONA"EZI'dPUT// PENDI/STEP1 EXEC R~eýPCNSEqLA3FJL1:
RESPONiSE PPOC* STL EXEC Pf. =PC2222'0'5,T IP-Itr-~h-ýf20n (lit___
*!TCSFOJ1 OL UNIT=TAPF-,VOL:(PR1 VATERrTDINSE =1038E) ,DISD3=cKEEP)D~* S~:AC.C*hISTORVOCP=(RECFfZVBSLRLCL=ft92,5LKS1,L..3392
OEN=)9LA8EL:(&LARELI.,,,OUT)
IEF6531 SUBSTITUTION ~JLL - LAbEL=d1,,oq~UT)**FTD2FCO1 DD UNIT= 3 133 OVOL:(PPTVATESER:SPOCL1)901SP:(¶.NRPAeSS~
**FT04FOD1 DE Ut.IT=SYCFLUCO(LRECL=721 ,PECF M=VPSQ!LKSIZE=36?4),
* *.fT06F00 DO SYSOUT=A*.FTOTFOCI DO SYSOUT:IP*OFT09FOCI DC UNIT:TAPEVOL=SER:PLO1,OSNZPLOTO1SI..(,KEEP)g
**FYo5FDD1 DE; DONArE=INP'U7* /STE.ItNPUT CU* IEF2361 ALLOC9 FOP OXWbNVRP STE STEPI
ICFE2371 433 ALLOCATLE, TC JOBLIP*IEF2371 3P2 ALLOCATED TC FTOPFnfli
I -257 .- ALL.DCA TL T C £TZ:IIEF217J E'5F ALLOCATED TO' CTOPF'Oi
*ILEF2ZT! D4 ALLOCATED V.w ' 6FLClILF2!71 OP9 ALLi;CAT~to T 0 F.L 7F(01iIEF271I 'E3 ALLOCATED TO FTO 9F c IILFý1371 Al1 ALLr:CATE:' TC. F7E¶.FrC1
IF141- STrP WA'- EECUTE"' - CCh7jI CI'flr OoooIEF2Pbl En'ý17*rrr*Ff22279n.JLlt- PAssLflIEF2ý5I VOL SEIk %OS= USEHU1.
ILF2t-il VOL SEý '!' lO!ýLIEFA-51 VlYr1.E: SI .Crb.Kl.22279t.EiPECOrr, pf~slD
IrFP!4 VL SEA NQO 5 ?L1* ILISZ ~r761A.T~,r~~ CLETID,
I[Fc'A5I VUL !EI* NOZ= !PUCL?.EF2h~tl PL"TF2ý15l VOL SLf .C. PL
A tfra mbnem#-_!T5F- S)t- 'TAC-T I' _ _ _ _ _ _ - SYST1vC T) F 6,IICN TAP'L ýL SECS1 5 7 r it' '. 7 1
. 33.74-__ $ ."7s L~j I
.i ',.
~g 16 A fA1'tCAL 0
* r~.1Z V ' Ci I C ( 1 11 C, ). S 3.LAO
f C) A2ECC I
.1 Lo*~~~
C .111b161t 12 2 5 2 L C
I r C.C ~ ~ C e 3 7i CI G. I5,1ýtj L U10
L V.tC 0 ',£ V s 0 j f, C I " ' L C .3 3 - 1
70. c 0 ~ . ( 0 i . 7 E £ L~3 ~
V0 u 53 t QE -C 1
f0~ -4 2 2 0 .2211,7 CL 1 -0b'E 1
* ~ ~ 1oo! I0~0' 4L L.T,9 02 O.11L 0 0.355b12 I
1* -C L 0015 1;15b 02 0 0. 549 &E -01
I i 0. &,c o o O 11 0~ f~ 00 3.2 25 9 7 E 0 0 C. 2 ~ 0
IC or~0L 0.1 OdT5E 02 0 128 1 0 k D30 1.bSC 2-0 1.
_ _ - .3*.4. .. O 1 44 ( 02 0 .2 9231L 30
21 C40' 0 . 2 ' 102P 0 250Ebl c cc
IhC 4-~ O i 0 .44201-
0 1
1 57C. O M . C O ~ 0 bE 0 2 0 2 , 1 97 1 E 0 0 g .( ,3 25 1 7 U ' 1
0* ., TC O 0 i 0o 0.2 1 02 O28t,98L 00 .2vB 9~ 0
* 25 0 4 600U 0 O,2 Tl E 02 5.b99 f00- I.b 2~
a26 0 E . 70.2 P q C 321 ~ v 0 62 4L ý
21 0.2* 00,O 0~ . r 2 0.2 9 DCo.62810E01
Oct59212-01
C, 0 0 0 00 0 031
I3 75?707 E -0 1 0
0 : 166ECZ 7 Ie O -j160 1I
223 0.29000i PC 0.3387924E29 91
21 0 .110u 01 00 0.23 27 1E C2 0.2 13 081 00 * kQ E C
351 0 . 2 7 C 0 P 0 1 0 .3 9 1 6 b 0 2 0 .2 6 1 8 L01 b0 0i E - -1
S 6, D OE00 0 0 0 0 .* 692 0 2& j L U I.1 3 1 g i A ' O * 8 b O
* 5
00 5U -I -
r,0. 2 C p C o. 23 0 02 C .27 &09~ E 002 lb L
270040 0:2716E0 02 0.25##04E 00 .91E 0
28 0:2 10 001 O a 29 6 E C 0 2 g 9 0 .261 C1 E-0 1
29 0. 1c1 C0 0 .29920C 02 c0,196071 LDQCIaiE-A
S u r00 C .6 1 5 02 0.151301 00 0. 3 3 E
*3 ~0.349 07E (02 01 .7 30SL 00 0.C1~ ~
___ -- 0.80000 0G 0 .785*01 02 0 .2 1 BeE 00j " M X * C 2*273lb - 1
35 0. 750c 0Er 0.837761 02 0.ý1 0135E 00 0. 13,) 5 2E -D
5 6 v7 C ,00 0 0 . 9 9 7 6 0 1 0 2 0 .122 12 0 0e
3.500~ 7. i %b6* 0 2 o.1S"-0 .21309L0
*1 3t0 0 0 C . 1 0 *23 1D 03 .21 1 20 0 E 0 0 C . C) 8 5 7 E -0 2
35 0. 5000(i ECC .571 zo6E 02 a.1 9607E 00
4C 013DO E cc0..113021 02 0.P2,1573 -1
41 C. aoo.* t.D£01bl3 03 0 1 130 CC9*LEI-02500CE-Cl 0.691*3E0 2 0.17198L 00 0 2 2 3 !D
*. 00 9
4t 0.7 1r. 41) EC2 a1416E 00 0.1-3537E-01
oDG -0 CU
450080 ~ L£ O ,1*5f' 02 a3 ,1 4175L CC7 6#E 0
CE-01 cj L664E t12 a.11*25t 00a2o E-70 10.1 7 1 3 0. 1110E 00
O. 2 30 L b C.1Ec16. O E a-E01
0£ 0 .VLrC 0.1357£61 .P21EC4k5(*¶7952 03 03 (1 1173p '2E0
2 C ~ 00~ L~ .00 *1 t .2 1907E 1 U C.43"tr-c 0143bEC3 .97S9 .0
TENNESSEE VALLEY AUTHORITY 01/12/76RESPONSE ACCELERATION SPECTRUM
WATTS BAR CONTAINMENT VESSELMASS POINT NO. 3DAMPING RATIO 0.0201/2 SSEFLOOR ELEVATION 716.5VERTICAL ACCELERATION
9 00 0.10 0.20 0.30 0.40 0.0 0.60 0.70 0.60 0.90 10
PERIOD IN SECONDS
A+-frornen- 15
0
0ý
0
.- 9
cc:
U-j
Lu 0
cc_
LuU):zoC
U)LuJ
0
c.,C0
F ORŽ1 3
WATTS BAR NIUCLEAR PLANTINDE~prNDEN'T REVIEW
10520DIN511510520.92.0000ref: 10520DIN3731
Finding N~umber fF /5101 /4
Co~ents pertinent to finding:
Revised the FSAR to show eccentricities used in the analysis. Performed ane igenvalue comparison and generated response spectra to justify not usingthe 5-percent eccentricity. All corrective action on WBN is complet~e;however, the initiating NCR is generic and the SQN FSAR changes are holdingup closure because all SQN changes are submitted on an annual basis.
TVA References (ECN, NCR, CTR, etc.):
NCR GENCEB8213FSAR Change - NEB 830823 262Eigenvalue Study - CEB 831028 008
Program Team MemberH- )-3
ate
Date
Date
OEDC Program iianager
Qhair.man, OEM Policy Committee?
Black & Veatch
Classification: Type VCategory 19
11'k&Veac Senior Review Team Chairman
Date
~Date
40,.
Evaluation of the TVA Form 3 Comments
F504
The data and documentation submitted by TVA was reviewed in the Civil/Structural
Department, and the issue is now considered resolved based on the following.
1. Modifying the FSAR to reflect what was actually done is appropriate.
2. The comparative study done by TVA confirms that the effect of the 5 per
cent eccentricity is small.
3. The results obtained by TVA are reasonable because the containment geometry
provides good torsional strength, and the seismic forces are typically
smaller than LOCA forces, which is the case if WBNP are expected to be
larger due to the ice condenser.
DIVISION OF ENGINEERING DESIGNNONCONFORMANCE REPORT
ME DS Access ion No. CE B 8W 0728 012
WREPORT NO. GENCEB8213 R1
1W PLANT Sequoyah, Watts Bar 13UNIT All
14 PREPARER/ORGANIZATION/DATE K. R. Spates /CEB/1l-8-'82[5ý DESCRIPTION OF CONDITI.ON
The Sequoyah and Watts Bar FSARs committed TVA to consider 5-percent eccentricity in the
seismic analysis of axisymmetric structures. These.-commitments were not met in the analyses
of the containment vessels for these plants.
I67DATE OF OCCURRENCE EST (X). ACT.) 1974-1978 51SIGNIFICANT CONDITION ADVERSE TO QUALITY
W D OF DISCOVERYRee7o oanenYS NE
0 W ODE (EN DES-EP 8.01) R6 10 ANC CHIE
ED CORRECTIVE ACTION: j rAV
Revise the Sequoyah- and N'atts .Bar Nuclear Plant FSARs to-indicate how asymmetrictorsional affects were taken into account for the steel containment vessel seismicanalyses. Prepare a comparative study of the containment-vessels eigenvalues withand without a 5-percent offset.
1CORCIEACTION DEVIATES FROM A DESIGN CRITERIA REQUIREMENT YES NO
.1ý3 DESIGN CRITERIA DOCUMENT NO. EXCEPTION REQUEST NO.
1041 ECN REQUIRED E] YES NO[ ECN NO. SCHEDULE IMPACT P A EN
NONCONFORMANCE REPORTWREPORT NO. GENCEB8213 R1
16 ASIGN'ABLE CAUSE: .-(R-EOQU.I _E SIGNIFICANT)
The way the FSAR was written, it implied that all axisymmetric structures were seismic ýanalyzed using an eccentricity of 5 percent of their outer diameter. However, this is
not true for all axisymmetric structures. For example, the WBN steel containment vessel
was modelled using calculated actual eccentricies at various levels of the structure.
The root assignable cause of this NCR is inadequate review of FSAR material.
THIS IS A GENERIC CONDITION YES~ NoO
17 ACTION REQUIRED TO PREVENT RECURRENCE: (REQUIRED IF SIGNIFICANT)
Section 3.8.2 of the FSAR was originally prepared prior to the issuance of EN DES-EP 2.01.
EP 2.01, section 4, requires review for accuracy of SAR inputs. This EP is presentlyin place and affected CEB personnel have been trained in its provisions.
19INDEPENDENT REVIEW:
f20@ LABOR EST. ( ). ACT. ()MH 21SCHEDULE EST. I . ACT.) DAYS
ACTIVITY NO. TASK DESCRIPTION DATE INITIATED
F2 5 REMARKS:
This revision was made in order to remove all reference to the deferred Yellow CreekNuclear Plant.
DISTRIBUTION: L6ALL EN DES ACTION COMPLETE:CONST PROJECT MANAGER
SEN DES PROJECT MANAGERCIEF, ESS
OFFICE OF GANEB Ifor Significant NdRs)*''RNHCIFOGMEDS CISBRNHCIFOGNSRS (for Significant NCRs)~ASSISTANT TO THE MANAGER OF OEDC lQuality
and Nuclear Safety)..for Significant NCRsDISTRIBUTE AFTER THIS SIGNATURE_____________________HANDCARRY COPY-TO NEBNLS--- MEDS ACCESSION NO.