Tfr rr+r, srnTt. t8z, q€ffi-l10 oo1. - CFMTTI, Budni
-
Upload
khangminh22 -
Category
Documents
-
view
4 -
download
0
Transcript of Tfr rr+r, srnTt. t8z, q€ffi-l10 oo1. - CFMTTI, Budni
qr{d YT6"R/ GOVERNMENT OT INDIAq$-{O\tH"T wqfr
q{N, g(fr (qoso),.RAcToR nece@S/ebsite :http: / /www.fmttibud n i. gov.in
AN Iso-goo 1:2O1S CERTrFrpo insTimpT@ftlNo. t7 -o7 I 2O15-FqTFIT, $tTq 4 fr+i67P.,ed: 09tr, July, 2O2l
Tfr r- Strrftry6rfrqrs,Tr+ft{ {g-s vFfi qdqrtqq. rgc.ft),
Tfr, u{+.rkar \nf frm,T s-€{rq- frrrr.T
TR q{ frqrt s-€{rur ri?Tilrr,
Tfr rr+r, srnTt. t8z, q€ffi-l10 oo1.
Forwarding of Monthly progress Report for the
3
month of June, 2O2L.AET
Trd-fiT,
Enclosed please find herewith2O2l of this Institute.
The summary is as under:
a copy of Monthly progress Report, June,
Tf,fiq
*.Tro}q
qFnt - :
1 MPR (all section) for the Month of June , 2021.2 Revised MpR of Training section for the month of May, 2a21.sfrfrfr:-1. Bq_gl-5ffi ftq ^\-s o Fry qE fu-sn o-iqm qa,qq, 6s, rrrorftcr yq fu-sn
o-erur fuTr, qfr r++, T$-ffi _ qrfr Rqld qfi qfr d rit'qnfro I
{-to: cr.lohi.nic.in
2. Bq6\rq GrMnT (frdfr) -!r{epq q,t d-q r+nz { etq-d}-s o-ri tg r
ffirr+
Annual Target Achievement up tothe reportins Month
Testin
CFMTTI, BUDNI Page f of 1No. tva7/2o15-{qT.4 Dated: |ei7.rtrI
MONTHLY PROGRESS REPORT IN RESPECT OF CENTRAL FARM AMCHINERY TRAINING & TESTING INSTITUTE, BUDNI (MP)FOR THE MONTH OF JUNE 2021
' J?s. In Lakh
SI.
No.
Sub-Head ExpenditureDuring
Previous Year
2020-21
BudgetEstimate
Current
Year
2021-22
ProportionateAllocation Up
to 06/2021
Amount
Spentduring
06/2021
ProgressiveTotal up to06/2021
Excess (+)/Saving(-) w.r.t.ProportionateAllocation upto 06/2021
Detailed Reasons for Excess 85Saving
1 2 3 4 5 6 7 9 10
Major Head 2401 -Crop Husbandry, 113- Agricultural Engineering, 01- Farm Machinery Training & Testing Institute, 01- Establishment
1 010101-Salaries 687.11 664.00 221.33 53.56 212.77 (-) 8.56Saving is due to vacant posts 85 CEAclaim Bills of Rs. 11.7 lacs underprocess
2 010102- Wages 94.73 100.00 25.00 7.83 18.02 (-) 6.98Saving is due to exercise of economymeasures. Bills of Rs. 5.3 lacs underprocess
3010103- OvertimeAllorvance
0 0.10 0.02 0 0 (-) 0.02 -
4 .010105- Medical
Treatment4.12 .11.00 2.75 0.69 .0.69 (-) 2.06 Bills of Rs. 2.2 lacs are under process.
5 OlOlll-(DTE) 7.99 25.00 6.25 1.54 2.70 (-)3.55Saving is due to exercise of economymeasures 86 COVID-19 Restrictions on
6 010112- (PTE) 0 10.00 2.50 0 0 (-) 2.50
7010113- Office
Expenses208.59 172.00 43.00 13.19 28.04 (-) 14.96
GeM Procurement of Rs. 55,652/- 86nther bills of 2.4 lacs under process.
8 010116- Publication 1.45 1.50 0.38 0.02 0.02 (-) 0.36-5T77-^fRi7o72 lacs are under process.Procurement proposal of Rs. 0.46 lac is
9010121- Supplies 86Materials
99.94 85.00 21.25 1.78 55.63 (+) 34.38to lOCL for supply of
(HSD).
10010126- Advertising &,Publicity
11.74 30.00 7.50 0.12 0.12 (-) 7.38
—-r~';7i^.78 lacs IS under processvide Work Order No.8-2/2021-22-Trgrecited 08.06.21
11 010127- Minor Works 45.16 60.00 15.00 0 0 (-)15 00 -rr^T^^^^nnexure I for details
12010150- Other
Charges37.08 35.00 8.75 1.39 1.39
(-) 7.36
due to COVID-19
fockdown. OeM Procurement ofP_ 1 11.780/-under process.
13 019613- OE (SAP) 2.19 3.00 .0.75 0 0(-) 0.75
(-) 35.10
p.nrnrement proposal is under processTOTAL 1200.10 1196.60 354.48 80.12 319.38 ^
MONTHLY PROGRE^SS REPORT IN RESPECT OF CFWTRat r'At>T\/T
THE MONTH OF TONE 20 INSTITUTE, BUDNI
Annexure-I
UNDER MAJOR HEAD - 2401.(MP) FOR
MINOR WORKS - 010127(BE 2021-22)
Rs. 60.00 Lakh
SI.
No.
Name of work Sanction
No. 8dAdmn.
Approval 85
ExpenditureSanction
wWorks already sanctl^^by the DepartmW1a n n1131 a . •. ^ IAnnual Electrical
Aw A
2.
Maintenance of the■Institute by the fPWnWhite washing of theresidential quarters(Type-I to V)
Petty Civil Works ofMiscellaneous nature
aited
Awaited
waited
Awaited
Year 2020^^
Amountutilized
_ h-%7
AmountAuth.
Funds likely tobe utilized
during 2021-22
Remarks
Rs. 1,56,204/
Total Rs. 60,00,000/.
Rs. 23,73,596/-
Rs. 34,70,200/-
Proposal for AA & ES for Rs. 23,73,596/-submitted to the Ministry vide Letter
■1-6/2013-14-Works datPri„ ——^ ".3 udieuProposal for AA & ES for Rs. 23,73,596/-submitted to the Ministry vide LetterNo. 1-4/2021-22-Works dated^^6-2021Proposal will be sent as & when theneed for work arises.
«.™,v "sso^s'.rs's™™''' "•"" """"•. ™ ~Major Head-"44m "
Motor Vehicle-T
SI.
No.
Major Head 4401-Capital Outlay on Crop
Husbandry-113,Agricultural
Engineering, 18-Green Revolution-Krishonnati Yojana,02- Sub-Mission on
Agricultural
Mechanization.
Rs. In Lakh
180251- MotorVehicle
Expenditureduring thepreviousYear
2020-21
0
BudgetEstimate
2021-22
ProportionateAllocation Upto 06/2021
w.r.t. B.E.
2021-22
Amount
Spentduring
06/2021
15.00 3.75 0
ProgressiveTotal up to06/21
0
Excess (+)/Saving (-)(w.r.t.
ProportionateAllocation upto 06/2021)
(-) 3.75
Remarks
For details please referAnnexure-II
,.,;-!i(^ii^
' Annexure-n
MONTHLY PROGRESS REPORT IN RESPECT OF CENTRAL FARM AMCHINERY TRAINING & TESTING INSTITUTE, BUDNI (MP) FORTHE MONTH OF JUNE 2021
UNDER MAJOR HEAD - 4401, Motor Vehicle - 180251 (BE 2021-22) Rs. 15.00 Lakh
Rs. In Lakh
dOC emaN
of
elciheV
ytitnauQ
Required
tnuomA
tnepS
sdnuF
ylekiL oteb
dezilitU
gnirud
22-1202
skrameR
(1)
(2)
(3)
)4(
(5)
.1
ardnihaM
oreloB
10
00.31
tnemerucorP
sisubjected
ot noitasilanif
of noitanmednocof
gnitsixe raC )rodass
abmA(more nah
t 01 sraeyold and
si dnoyeB
lacimonocE
riapeR
.)REB(
Total
00.31
MONTHLY PROGRESS REPORT IN REISPECT OP CPMTtjat •r'Ami/r
^ (^'P) for
Mafor Head-"440i»Machinery & Eqnipnient-180252
SI.
No.
Major Head 4401-Capital Outlay onCrop Husbandry-113, AgriculturalEngineering, 18-Green Revolution-Krishonnati Yojana,02- Sub-Mission on
Agricultural
Mechanization.180252- Machineiy& Equipment
Rs. In Lakh
Expenditureduring theprevious
Year
2020-21
BudgetEstimate
2021-22
0 450.00
ProportionateAllocation Upto 06/2021
w.r.t. B.E.
2021-22
112.50
Amount
Spentduring
06/2021
ProgressiveTotal up to06/21
0 0
Excess (+)/Saving (-)(w.r.t.
ProportionateAllocation upto 06/2021)
(-) 112.50
Remarks
For details please referAnnexure-III
MONTHLY PROGRESS REPORT
AnneTOire-in
IN RESPECT OF CENTRAL FARM AMCHINERY TRAINING & TESTING INSTITUTE, BUDNI (MP) FORTHE MONTH OF JUNE 2021
UNDER MAJOR HEAD - 4401, Machinery & Equipment - 180252 (BE 2021-221 Rs. 450.00 Lakh
SI.
No.
Name of Machine/Equipment/
Instruments/ Tools
QuantityRequired
Amount
SpentFunds Likely tobe Utilized during
2021-22
(Amount in Lacs)
Remarks
(1) (2) (3) (4) (5)
1. Self Propelled TractionLoad Car-80kN Pull
1 Nil 396.0 Draft e-Tender Notification has been submitted toministiy for approval vides Letter No. 3-4/2016-17 CPS(T) dated 15.06.2021
2. Digital Weigh PadCapacity- 8 Ton
1 Nil 8.0 Indent received, Procurement initiated
3. Tractor (Messy Fergusson) Nil 7.5 • To be purchased as a replacement of old tractor,condemnation would be followed up shortly
4. Tractor (John Deer) 1 Nil 6.5 To be purchased as a replacement of old tractor,condemnation would be followed up shortly
5. Sound Level Meter 1 Nil 7.0 Procurement process on final stage6. Water Proof Test Set up 1 Nil
— Procurement deferred to next FY7. Digital Fuel Density Meter 1 Nil 1.5 Procurement process is at final stage8. Vibration Meter
(New Procurement)1 Nil 6.5 items needs to be procured due to rejection of last year
procured item being found unsuitable on receipt. Fundsearmarked against SI. No. 8 may be utilized for subjectprocurement.
Item needs to be procured due to failure the existinginstrument and to ensure redundancy.Funds earmarked against SI. No. 8 may be utilized forsubject procurement.
9. Steering Effort Meter(New Procurement)
1 Nil 17.0
Total 450.0
►MONTHLY PROGRESS REPORT IN RESPECT OF CENTRAL FARM AMCHINERY TRAINING & TESTING INSTITUTE BUDNI fMPl FORTHE MONTH OF JUNE 2021 iJUDNI (MP) FOR
Mafor Head-"44m "Mafor Works-180253
Rs. In Lakh
SI.No.
1
Major Head 4401-Capital Outlay onCrop Husbandry-113, AgriculturalEngineering, 18-
Green Revolution-Krishonnati Yojana,02- Sub-Mission on
AgriculturalMechanization.
Expenditureduring theprevious
Year
2020-21
BudgetEstimate2021-22
ProportionateAllocation Upto 06/2021w.r.t. B.E.
2021-22
AmountSpentduring
06/2021
ProgressiveTotal up to
06/21
Excess (+)/Saving (-)
(w.r.t.ProportionateAllocation upto 06/2021)
Remarks
i-Viajor worlds 288.00 589.00 147.25 0 0 (-) 147.25 For details, please referAnnexure-IV
Annexure-IV
MONTHLY PROGRESS REPORT IN RESPECT OP CENTRAL FARM AMCHWERY TRAINING & TESTING INSTITUTE Rim^THE MONTH OF JUNE 2021 "iiHG insilTUTE, BUDNI (MP) FOR
UNDER MAJOR HEAD - 4401, Major Works - 180253 (BE 2021-22)
SI.
No.
Name of work
(1)
Sanction
No. &
date
(2)
Admn.
Approval &ExpenditureSanction
(3)
Works already sanctioned by the Department
Rs. 589.0Q LakhYear 2020-21
Amount
Auth. to
(4)
Amount
utilized
(5)
Funds likely tobe utilized
during 2021-22
(6)
Remarks
(7)
1. Construction of
Demonstration Hall and
Smart Class Rooms
Construction of Overhead
water tank
Construction of Laboratory-cum-Shed for conductingrunning-in testing of enginesof tractors
Miscellaneous workpertaining to boundary walls& fencing at the residentialquarters. (New Work)
Awaited Awaited
Rs.4,83,12,700/-
Rs.55,87,300/-
^quisitionproject has been sent CPWD vide LetterNo. 1-18/2015-16/Works dated 15.06.2021 &24.06.2021 sent to CPWDfo^-s^ttinp a.^posal for AA~ir~En^r Rs. 55,87,300/-submitted to the Ministry vide Letter No1-2/2021-22-Works dated 01.07.2021.
Rs. 25,00,000/- Requisition forPre^^ Estimate (PE) for theproject has been sent CPWD vide LetterNo. 1-3/2021-22-Works dated 17.06 2021 &05.07.2021.
Rs.25,00,000/.Requisition for Preliminary Estimate (PE) for theproject has been sent CPWD vide LetterNo. 1-2/2020-21-Works dated 17.06.2021.
Total Rs.5,89,00,000/-
&i>
9^/
t
CENTRAL FARM AMCHINERY TRAINING fis TESTING INSTITUTE. BUDNI (MPl
REVENUE RECEIPT DURING JUNE 9.091
Amount in Indian Rupees
SI. No. Source of Revenue
Receipt
During
Previous FY
(2020-21)
During the
Month
June, 2021
Progressive
up to
June 2021
1. Training 3,68,020 7,34,000 8,62,100
2. Testing 8,50,78,924 15,04,260 50,25,386
Farm 39,43,559 8,70,388 19,81,6844. Misc. 26,90,503 11,313 72,233
TOTAL ' 9,20,81,006 31,19,961 79,41,^03
\
MPR OF TRAINING WING FOR THE MONTH OF JUNE, 2021["Ti^T&TI, Budni
1. Training Activities
No. 11-6/2021-22-Trg. Dated: 30.06.2021
S.
No-
1.
Particulars
Target
NSQF
(QP)U
In
campus
Off
campus
NB *SDPMLAB
4300(vide Ministry's letter no. 13-19/2020M
M Total
&T(I&P) dated 21 August 2020)
3.
No. of applications carriedforwarded from the previousyear
No. of applications receivecup to the previous month
47 21 260
57
328
57
4. No. of applications receivedduring the month
01 127 01 240 41 410
5. No. of applications receivedup to the month
01 127 01 297 41 467
Total No. of applications upto reporting month (2+51
48 127 22 557 41 795
No. of applications deleteddue to non-response up to thereporting the month
107 107
Net No. of applications up toreporting month (2+5-71
48 127 22 450 41 688
No. of trainees carriedforwarded from previous vearNo. of trainees joined up tothe previous monthN
68 25 55 148
10.230 230
11. o. of trainees Joined duringthe reporting month 127 01 41 169
12. No. of trainees joined up tothe reporting month
127 47 231 41 446
14.
TsT
IT.
iF
No. of trainees joined up tothe reporting month(including carried forwardfrom previous vear) (9+12.Trainees discontinued duringthe monthNo. of trainees discontinuedup to the reporting monthTrainees trained during themonth
Trainees trained up toreporting monthNo. of trainees under training
68 127 72 286 41
63 'W
16
56
04
IF"
41
JT
*SDPMLAB (Skill Development Programme for Migrant Labourers under "Atmanirbhar Bharat"
Total No. of Apprentice
16Apprenticeship completed during the month
01
594
0?
502"
Apprentice under Trainins
15
Particulars*SDPMLAB Total
campus campusBreak of trainees trained during the month-Cate
wiseGeneral
TOTAL
Break of trainees trained up to the month-Categorv-wisfGeneral
b) SC
c) OBC
d) ST
TOTAL
Break up o' trainees trained durii^ the mont13
i-Land holding-wiseLandless
Marginal
Small
Semi-Medium
Medium
Large
TOTAL
Break up of trainees trained up to the month-Land lolding-wiseLandless
Marginal
Small
Semi-Medium
Medium
TOTAL
Apprentice UnderTraining (Graduate/Diploma/ITI Trade)Women/Women farmers
trained during the monthWomen/Women farmers
trained up to the monthTotal Farmers trained upto the month
Total trainees admitted
since inception72560
Trainees discountinued
after implementation newsi. No. series of certificate
Actual trainees trained
since inception72560
''SDPMLAB (Skill Developnniemt Programme for Migramt Labourers umder "Atmamirbhar Bharat".
n<>nionstration Activities
2. Demonstration of Newly Developed Equipment under SMAM:-2.1 Demonstration during the month:-192.2 Demonstration (SMAM) up to the month:-19
1 No. of Demonstration 19
2 No. of Machines demonstrated 13
3 No. of beneficiary 308
• These machines were demonstrated at the farmers field during field demonstrations and off campustraining under U-5 training program in their village.
Categorv-wise beneficiaries un to June, 2021
Male Female Total
SC 11 02 13
ST — — —
OBC 113 88 201
GEN 64 30 94
TOTAL 188 120 308
3. Fair and Exhibition Activitv
S.
No.
Period Name & Place of the fair/exhibition
From To
1. —~ ~
Distribution :-
l-.-Accottnts Section /DDO
(MaheshJ^hafi^a)Senior Agricultilfm Engineer
Ans Va
0)
CENTRAL FARM MACHINERY TRAINING AND TESTING INSTITUTE,TRACTOR NAGAR, BUDNI
PROGRESSIVE TOTAL OF STATE-WISE TRAINEES TRAINED JUNE, 2021
s.
No.
State NSQF u T A NB M ^SDPMLAB Grand
Total1 Andaman <& Nicobar 0 0 0 0 0 0 0 0
2 Andhra Pradesh 0 0 0 4 0 0 0 4
3 Arunachal Pradesh 0 0 0 0 0 0 0 0
4 Assam 0 0 0 0 0 0 0 0
5 Bihar 0 1 7 76 0 0 0 84
6 Chandigarh 0 0 0 0 0 0 0 0
7 Chhattisgarh 0 0 0 3 0 0 0 3
8 Delhi 0 0 0 1 0 0 0 1
9 Goa 0 0 0 0 0 0 0 0
10 Gujarat 0 0 0 3 0 0 0 3
11 Haryana 0 0 0 24 0 0 0 24
12 Himachal Pradesh 0 0 0 0 0 0 0 0
13 Jammu & Kashmir 0 0 0 0 0 0 0 0
14 Jharkhand 0 0 0 7 0 0 0 7
15 Karnatak 0 0 0 0 0 0 0 0
16 Kerala 0 0 0 0 0 0 0 0
17 Lakshadweep 0 0 0 0 0 0 0 0
18 Madhya Pradesh 0 114 33 101 41 0 0 289
19 Maharashtra 0 1 3 0 0 0 0 4
20 Manipur 0 0 0 0 0 0 0 0
21 Meghalaya 0 0 0 3 0 0 0 3
22 Mizoram 0 0 0 0 0 0 0 0
23 Nagaland 0 0 0 1 0 0 0 1
24 Orissa 0 0 0 7 0 0 0 7
25 Pandicherry 0 0 0 0 0 0 0 0
26 Punjab 0 0 0 0 0 0 0 0
27 Rajasthan 0 0 0 0 0 0 0 0
28 Sikkim 0 0 0 0 0 0 0 0
29 Tamil Nadu 0 0 0 0 0 0 0 0
30 Tripura 0 0 0 0 0 0 0 0
31 Telangana 0 0 0 0 0 0 0 0
32 Uttar Pradesh 0 7 12 46 0 0 0 65
33 Uttarakhand 0 0 0 1 0 0 0 1
34 West Bengal 0 0 1 4 0 0 0 5
35 Foreign Nationals 0 0 0 1 0 0 0 1
Grand Total 0 63 56 282 41 0 0 502
(MahesifClmdra)Senior Agricultural Engineer
■TRcT / Government of India
^ Tj^ra^ / Ministiy of Agriculture and Farmers Welfarey%5FT TFT^F^SFT 'tl'WN / CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE(F.F.) 466 445 / TRACTOR NAGAR, BUDNI (M.P.) 466 445
Website:http://www. fmttibudni.gov. Email: fmti-mpTnnic.in Tel ; 91-7564-234729 GSTIN;23AAA6C0890H1ZS(An ISO : 9001-2015 CERTIFIED INSTITUTE)
No.: 20-1/2015-Test Dated: July, 2021
NOTE
Sub: - Progress report in respect of testing activities for the month of JUNE, 2021Regarding.
Sir,
The progress report for the month of June, 2021 in respect of testing activities is enclosedherewith for kind information and further necessary action.
(Y. K. RAO)Senior Agricultural Engineer
Copy to: P.A. to Director - For kind information.
Distribution:
1.
2.
3.
T.E - By E-mailSIE - By E-mail for uploading on the Institute's website.Admin. Section - for forwarding to ministry
Page 1 of 14
iTRcT /Government of India
cbcdl"! / Ministry of Agriculture and Farmers Welfare^ TRfFifl yflism ̂ FffarvT / central farm machinery training & testing institute
466 445 / tractor NAGAR, BUDNI (M.P.) 466 445Website;http://www. fmttibudni.gov. Email: [email protected] Tel: 91-7564-234729 GSTIN:23AAAGC0890H1ZS
(An ISO : 9001-2015 CERTIFIED INSTITUTEJDated: 5'" July, 2021
No.: 20-1/2015-Test
PROGRESS OF TESTING ACTIVITIES FOR THE MONTH OF JUNE, 2021
S. No.Particulars Nos.
1 Target60
11 No of Application carried forward from the previous year 112 (43+69)
III No. of Application received during the month (A-1) 06
IV No. of Application received up to the reporting month 28
V No. of Application withdrawn up to the reporting month 09
VI No of Application deleted due to non response for submitting the sample 0
VII Total number of applications received up to the reporting month (11 + IV) 140
VIII Net number of applications received up to the reporting month [(II+IV) -(V-i-VI)l
131
IX Machine carried forward from the previous year69
X No. of Machine received for test during the month (A-2)3
XI No of Machine received for test up to the reporting month8
XII Net number of machines received up to the reporting month (IX-nXI)77
XIII No. of machine withdrawn (A-6)0
XIV No of machine under test carried forward from the previous year69
XV No of machines taken up for test during the month (A-2)7
XVI No of Machines taken up for test up to the reporting month15
XVII Net No of Machines taken up to the reporting month [XlV+XVl- XIII] 84
XVIII No of draft test report carried forward from previous year13
XIX No of draft test report released up to previous month 23
XX No. of draft test report released during the month (A-3) 10
XXI No. of draft test report released up to the reporting month (XIX^-XX) 33
XXII No. of Final Test Reports released during the month (A-4) 15
XXIII No. of Final Test Reports released up to the reporting month 30*
XXIV Machine under test [XVII-XXIII] (A-5) 54
XXV Machine tested since Inception (Up to June, 2021) 2082
XXVI Monthly Progress Report on CMVR/Emission (Type Approval/COP)
A. CMVR certified issued on TRACTOR
During the current month (A-7) 00
During the current year 01
CMVR certificate issued since inception 1559
B. Emission (Type Approval/COP) certified issued on ENGINEDuring the current month (A-8) 00
During the current year 01
Emission (Type Approval/COP) certificate issued since inception 63 ̂
* INCLUDING 05 NOS. ONLINE TEST REPORTS
IyTK. RAO)Senior Agricultural Engineer
Page 2 of 14
Annexure-1
LIST OF APPLICATIONS RECEVIED IN JUNE, 2021:
SLNo.
1.
2.
Make & Model of Machine
Escorts Limited, EURO 42
Escorts Limited, 425 N El
Type ofTest
ICT
Batch
Applicationreceived date
03.06.21
1 c; ha o 1
Remarks
28/2021-22/25
3.
4.
5.
New Holland, 4710 A2
tape, tape 30 DI OrchardPlus V2
Captain, Captain 200 Dl-HS
Variant
ICT
ICT
1 D.UO.^ 1
19.06.21
22.06.21
O/l O 1
28/2021-22/26
28/2021-22/27
28/2021-22/28
6. Mahindra, 415 DI (Brand:Bhoomiputra)
Batch
-64.UO.21
25.06.21
28/2021-22/29
28/2021-22/30
List of r
SLNo.
uachines received for test during the n
Make & Model of Ma oh fn a
lonth June^ 202]I:
Annexure-2
1. Mahindra, Arjun 605 DI iType oi Test
ICT
Remarks28/2021-22/17, OnlineApplication
2. Mahindra, NOVO 605 01ICT 28/2021-22/18, Online
Application3. Mahindra, NOVO 655 DI PP 4WD
ICT 28/2021-22/19, OnlineApplication
List of Draft test report released in June, 2021Annexure-3
S. No Make & Model of the MachineNature of TestVST Shakti, MT 171 DI
ConfidentialDTR in June. 21
New Holland. 3230Tech. Ext (DTR in June. 21C
New Holland,ommercial (variant)DTR i
3600-2 A1 (On June. 21
Mahindra, B 275 DI TU MKM (Brand Batch (Variant)(DT
name ~ Sarpanch)R in June
7; -TAPE, MF 1035 DI V2 uncommercial (Batch)(DTR in June, 21)
6.
~
Swaraj 724 FE 4WD (O)
ITL, Solis 2516 (O)
Commercial
(DTR in JuneIILCommercial
(DTR in June, 21)8. Eicher, 380 USJ
Commercial
(Batch Variant) (DTR in June. 91)Escorts Limited, 60 F2 (BRANDNAME-FARMTRAC)Solis 50 4WD
Commercial
(Batch - Variant) (DTR in June, 21)10.
OECD
(Code-2)(DTR released in June. 2021)
Page 3 of 14
Annexure-4
List of final test report released up to June, 2021
_5_6_7_8
JO_n12
13
Make & Model of the Machine
Swaraj, 735 FE e RACE, ACT 60 Self PropelledP.nmbine Harvester (Track T>
605 DI MS (Brandname - Ariun Novo)TAPE. MF 79.60 DI E7TAFE. MF-1030 MahashaktiNew Holland. 471 OANew Holland. 471 OANew Holland 4010ANew Holland 4010APreet. 254Q Agritrac 4WD~Tafe Ltd, MF 241 DI V21TAFE. MF 241 DI"TAFE, MF 241 DI Planetary Plus VI
14 1 Mahindra, 415 DI(Brand name - Bhoomiputra)—
1.S I Ni^iTH^nd. 3630 TX(Onlin^1A Swaraj, 960 FE17. Swaraj, 960 FE18. Mahindra, Yuvo 575 DI
1Q. Preet. 4549 Challengeron ACE DI 305 NG
"21. Captain 250 DI (Online)
22 VST Shakti, MT171 DI*
23
24
New Holland, 3600-2 AlMOni^International Tractors Limited,Solis 2516* (Online)"Mahindra, B 275 DI TU MKM Itsrand name- Sarpanch) *TAFE, MF 1035 DI V2*
27 I Swaraj 724 FE 4WD*28 New Holland, 3230*
Escorts Limited, 60 V'2 (BRAND NAME-' FARMTRAC)* (Online )
~2Q 1 Eicher 368 USJ *
Type of test
Variant
1st Batch
Batch (Variant)
Variant
1st Batch
Tech Ext
1st Batch
Tech Ext1st Batch
ICT
ICT
1st Batch
1st Batch
(Variant)
Batch Test(Incomplete)
Batch
Tech. Ext
Is' Batch
I SI Batch
(Variant)1st Batch
1st Batch
1st Batch
ConfidentialConverted toCommercial
Variant
ICT
Batch (Variant)
Commercial(Batch)
Commercial
Tech. Ext
Isi Batch
(Variant)
I SI Batch
(Varianh
Test Report No.
T-1526/2053/2021
Comh-65/ 2054 / 2021
T-1527/2055/202i
T-1528/2056/2021T-1529/2057/2021T-1530/2058/2021T-1531/2059/2021T-1532/2060/2021T-1533/2061/2021T-1534/2062/2021T-1535/2063/2021T-1536/2064/2021T-1537/2065/2021
T-1539/2067/2021T-1540/2068/2021T-1.S41 / 2069/2021T-1542/2070/2021
T-1543/2071/2021T-1.S44/2072/2021T-1545/2073/2021
T-1547/2075/2021T-1548/2076/2021
T-1549/2077/2021
T-1550/2078/2021
T-1551/2079/2021T-1552/2080/2021T-1553/2081/2021
*DTR & FTR released in the month of June, 2021
SUMMARY — ^
1 Tractorzy
2 Combine Haryester01
Total30
Month ofrelease
April. 2021
April, 2021
April, 2021
April. 2021"April. 2021
April. 2021
April. 2021April. 2021April. 2021
April. 2021
April. 2021
May. 2021
May, 2021
T-1538/2066/2021 May, 2021
May. 2021June, 21
June, 21
June, 21
June, 21
June, 21June,21
T-1546/2074/2021 June, 21
June, 21
June, 21
June, 21
June, 21
June, 21June, 21June, 21
T-1554/2082/2021 1 June, 21
Page 4 of 14
Annexure-6
10
11
12
13
List of Machines Under Test on 30*^ June, 2021Target Date forcompletion of
t^t7
Month of start
of test
Name of The Name and Address of Manufacturer/Applicant
Present position of testNature of
TestMachine Make &Model
DTR allotted02.04.21
offline application
DTR allotted AE(V)02.04.21 (offlineapplication)
DTR in July,21DTR under preparation13.07.20M/s. International Tractors Limited,CommercialSonalikaVillage: Chak Gujran,International, MMP.O. Piplanwala, Jalandhar Road
Breakdown occurred DTR in July, 2103.08.20M/s Eicher Tractors,CommercialEicher-557 during haulage test(A Wholly Owned Subdidiaiy of TAPE),(Batch Test)
Plot No. 1, Sector -D, Industiral Area,462 046, M.PRaisenMandidee AE(V) -allottedDTR in July, 21DTR under preparation04.08.20M/s Eicher Tractors,CommercialEicher-548 02.04.21
(A Wholly Owned Subdidiaiy of TAPE),(Batch Test) (offline application)Plot No. 1, Sector -D, Industiral Area,
Distt. Raisen -462 046 M.PMandidee AE(RP)allottedDTR in July, 21Under wear assessment05.08.20M/s.Escorts Limited, (offlineCommercialEscorts Limited 08.02.21.15/5, Mathura Road ,Faridabad -121 003 application). (Piston ring35 (Brand name
end gap observed moreParmtrac)
than the discord lirmt)DTR in July, 21DTR under preparation11.08.20
Escorts, 22 (Brandname: Parmtrac)
Mahindra 605 DI i4WD S+
Solis 26 4WD
TAPE, MP 95002WD
Mahindra, Yuvo
275 DI
Mahindra, Yuvo
475 DI
Solis WT 75 4WD
TAPE, MP 95004WD
KUBOTA, L4508DD
Commercial
Commercial
(Batch-Variant)
OECD
Commercial
(Batch Test)
Commercial
(Batch FullTest)
Commercial
(Batch Test)
OECD
(Code-2)
Commercial
(Batch Test)
Commercial
(Batch Test)
M/s.Escorts Limited,15/5, Mathura Road ,Faridabad -121 003M/s. Mahindra & Mahindra Ltd,Farm Equipment Sector,Akurli Road, Kandivli (E),Mumbai 400 101
M/s. International Tractors Limited,Village: Chak Gujran,P.O. Piplanwala, Jalandhar Road, (PB)M/s.Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,Chennai-600 034
M/s. Mahindra 8& Mahindra Ltd,Farm Equipment Sector,Akurli Road, Kandivli (E),Mumbai 400 101
M/s. Mahindra 8& Mahindra Ltd,Farm Equipment Sector, Akurli Road,Kandivli (E), Mumbai 400 101
M/s. International Tractors Limited,Village: Chak GujranP.O. Piplanwala, Jalandhar Road, (PBM/s.Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,
10.11.20
07.12.20
08.12.20
11.12.20
M/s. Kubota Agricultural Machinery IndiaPvt. Ltd., Block No. 94, Towers-1-8'^ Floor,TVH Beliciaa Towers,
MRC Nagar, Chennai - - 600028
15.12.20
17.12.20
04.01.21
04.01.21
DTR under preparation DTR in July, 21
DTR under preparation DTR in July, 21
Under wear assessment DTR in July, 21
Breakdown occurred
during brake test (underrepair)
DTR in Sept, 21
2 times Breakdown UnderPTO Test
DTR under preparation
Under wear assessment
DTR under preparation
DTR in Aug, 21
DTR in July, 21
DTR in July, 21
(offline application)
DTR allotted AE(PY) -03.05.21 (offlineapplication)
DTR allotted02.04.21application)
AE(PY) -(offline
DTR allottedAE(RP)(ofnineapplication)
to
(offline application)
Excessive power
observed during pto testInformed to C.R. on15.06.2021
DTR allotted AE{PY) -02.04.21 (offline. dicationlDTR allotted to AE(RP)»(offline application)
DTR allotted to AE(R),28/2020-21/16Online application
Page 5 of 14
1 2 3 4 5 6 7 8
14 TAPE, MF 5245 DlPlanetary Plus VI
Commercial(Batch Test)
M/s.Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,Chennai-600 034
06.01.21 Under wear assessment DTR in July, 21 DTR allotted to AE(V),(offline application)
15 John Deere, 5310V3
Commercial(Batch Test)
M/s. John Deere India Private Limited,Unit: John Deere Pune Works,Off Pune-Nagar Road, Sanaswadi,Pune-412 208
08.01.21 Under wear assessment DTR in July, 21 DTR allotted to AE(S),(offline application)
16 TAPE, MP 241 DI AT Commercial M/s.Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,Chennai-600 034
13.01.21 Waiting for field test DTR in Aug, 21 28/2020-21/12Online application
17 TAPE, MP5118 Confidential M/s Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,Chennai-600 034
15.01.21 Under drawbar test DTR in Aug, 21 (offline application)
18 Mahindra, JIVO 245DI
Commercial(Batch Test)
M/s. Mahindra & Mahindra Ltd,Farm Equipment Sector,Akurii Road, Kandivii (E),Mumbai 400 101
19.01.21 Under drawbar Test DTR in Aug, 21 28/2020-21/8Online application
19 International
Tractors Ltd., SoilsWorldtrac 90 4WD
OECD M/s. International Tractors Limited,Village: Chak Gujran,P.O. Pipianwaia, Jaiandhar Road, (PB)
20.01.21 Waiting for drawbar Test DTR in Aug, 21 (offline application)
20 TAPE Ltd., MP 5245DI 4WD
Commercial(Batch Test)
M/s.Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,Chennai-600 034
01.02.21 Waiting for haulage test DTR in Sept, 21 28/2020-21/21. Online
Application.
21 International
Tractors Limited, DI-
750 III HDM
Commercial '(Batch Test)
M/s. International Tractors Limited,Village: Chak Gujran,P.O. Pipianwaia, Jaiandhar Road, (PB)
01.02.21 Waiting for drawbar Test DTR in Sept 28/2020-21/17. OnlineApplication.
22 VST SHAKTI,MT180/JAI-2W
Commercial
(Batch -
Variant)
M/s.V.S.T. Tillers Tractors Limited,Plot 39-1 Sipcot INDL. Complex.Mookandapalli, Hosur-635126
03.02.21 Waiting for drawbar Test DTR in Aug, 21 28/2020-21/15.
Online Application.
23 KN Farm EquipmentLtd., Kushal 3456
Commercial M/s. KN farm Equipment Private Limited,Sy. No. 487, Quthbullapur, ranga Reddy,Telangana- 500072
04.02.21 DTR under
preparation(Incomplete test
report)
DTR in July, 21 DTR allotted to AE(S),28/2020-21/10Online Application.
24 International
Tractors Limited,Sonalika
International DI-740
Super CM Series
CommercialTech Ext.
M/s. International Tractors Limited,Village: Chak Gujran,P.O. Pipianwaia, Jaiandhar Road, (PB)
i
08.02.21 Under hydraulic Test DTR in July, 21 28/2020-21/13 OnlineApplication.
25 International
Tractors Ltd., Soils4515
Commercial M/s. International Tractors Limited,Village: Chak Gujran,
i P.O. Pipianwaia, Jaiandhar Road, (PB)
08.02.21 Waiting for drawbar Test DTR in Sept, 21 28/2020-21/47
Online Application.
26 KUBOTA, MU5502 Confidential , M/s. Kubota Agricultural Machinery India Pvt.Ltd., Block No. 94, Towers-1-8'*^ Floor, TVH
i Beliciaa Towers,
j MRC Nagar, Chennai - - 600028
09.02.21 Waiting for drawbar Test DTR in Sept, 21 28/2020-21/32Online Application.
Page 6 of 14
1 I ^27 Solis 75 RX 4WD
"^8 1 Swaraj 963 FE ST4x4
Commercial
"29 I InternationalTractors Ltd., Solis4215
"30 I New Holland, 5510El
Commercial
Commercial
"31 John Deere, 5205 Commercial -
Variant
"32 Swaraj, 742 FE Commercial
Tech Ext
M/s. International Tractors Limited,Village; Chak Gujran,P.O. Piplanwala. Jalandhar Road, (PB)M/s Mahindra & Mahindra Ltd,Swaraj Division,Phase IV, Industrial Area.S.A.S. Nagar (Mohali),Near Chandigarh-160 055M/s. International Tractors Limited,Village: Chak Gujran,P.O. Piplanwala, Jalandhar Road, (PB)M/s. CNH Industrial (India) Pvt. LTd.Plot N0.-3, Udyog Kendra,Greater Noida- 201 306, ^M/s. John Deere India Private LimitedUnit: John Deere Pune Works,Off Pune-Nagar Road, Sanaswadi,Pune-412 208M/s Mahindra & Mahindra Ltd.Swaraj Division,Phase IV, Industrial Area,S.A.S. Nagar (Mohali),Near Chandigarh-160 055
~33 1 Swaraj, 742 FE CommercialBatch Test
"34 I Solis Worldtrac 1054WD
OECD
"35 1 TAPE Ltd., MF 7250DI VI.1
Commercial
(Batch Test)
"36 I Escorts Limited, 45F9
"37 1 Escorts Limited,6055 FBI (Brand
Commercial
(Batch -Variant Test)Commercial
M/s Mahindra & Mahindra Ltd,Swaraj Division,Phase IV, Industrial Area,S.A.S. Nagar (Mohali),Near Chandigarh-160 055M/s. International Tractors Limited,Village: Chak Gujran,P.O. Piplanwala. Jalandhar Road, (PB)M/s.Tractors and Farm Equipment Ltd.,Post Box No. 3302, 35 Mahatma GandhiRoad, Nungambakkam,Chennai-600 034M/s.Escorts Limited, 15/5, Mathura RoadFaridabad -121 003
M/s.Escorts Limited, 15/5. wiathura RoadFaridabad -121 003
Name- Farmtrac)
"38 l Escorts Umited, 439El (Brand Name-Powertrac)
~39 I Eicherl88 4WD
Commercial
(Batch -Variant)
M/s.Escorts Limited, ono15/5, Mathura Road .Faridabad -121 004
Commercial -Variant
40 John Deere, 5042DV3
Commercial
(BatchVariant)
M/s Eicher Tractors,
(A Wholly Owned Subdidiary of TAPE),Plot No. 1. Sector -D, Industiral Area,Mandideep Distt. Raisen -462 046 (M.P.)M/s. John Deere India Private Limited.Unit: John Deere Pune Works,Off Pune-Nagar Road. Sanaswadi,Pune-412 208
01.03.21
09.03.21
09.03.21
05.04.21
09.04.21
Waiting for drawbar Test
Waiting for drawbar Test
Waiting for drawbar Test
Waiting for drawbar Test
PTO Test completed, otherproposed tests to be
discussed
Under hydraulic Test (fileis under submission)
Under hydraulic Test (fileIs under submission)
Waiting for drawbar test
Waiting for drawbar test
DTR under preparation
Waiting for drawbar test
OTR in Sept, 21 Offline application
DTR in Sept, 21 offline application
DTR in Sept, 21 \ 28/2020-21/48Online Application.
DTR In Sept, 21 Online Application.
DTR In July, 21 28/2020-21/37Online Application.
DTR in Get, 21 \ 28/2020-21/44Online Application
DTR in Get, 21 | 28/2020-21/45Application
Online
DTR in Aug,21 offline application
DTR in Get,21 | 28/2020-21/30Online Application
DTR in Get,21 28/2020-21/35
Online Application
DTR in Get,21 28/2020-21/46
Online Application
DTR under preparation DTR in July, 21 DTR allotted to Sh. Satya,STA, 28/2020-21/29Online Application
09.04.21 Waiting for drawbar Test DTR in Oct,21 Tofflme application
DTR under preparation DTR in July, 21 ] DTR allotted to AE(R),oflline application
Page 7 of 14
J
John Deere, 5045D Commeroia!13.04.21 DTK under preparation
(Batcl -
Variant)
42
43
44
45
47
48
50
51
52
53
54
Swaraj 742 XT
Mahlndra, 555 DIPower +
John Deere, 5036D
Escorts Limited,Farmtrac 6050 F1UMEscorts Limited,Farmtrac 6050 F1UM
Escorts Limited,Farmtrac 60
Eicher 242 USJ
Mahindra, NOVO605 DI
Mahindra, NOVO655 DI PR 4WD
TAFE, MF9515
TAFE. MF1015
Soils 50 4WD
Commercial
Variant
Commercial(Batch T^st)
Commercial(Batch Test)
Tech. Ext
Tech. Ext
Variant(Batch)
Commercial
Commercia;
OECD AdminExt
OECD AdminExt
OECD
Code-2
M/s. John Deere India Private Limited,Unit: John Deere Rune Works,Off Pune-Nagar Road, Sanaswadi,Pune-412 208
M/s Mahindra & Mahindra Ltd,Swaraj Division,Phase IV, Industrial Area,S.A.S. Nagar (Mohali),Near Chandigarh-160 055M/s. Mahindra & Mahindra Ltd,Farm Equipment Sector,Akurii Road, Kandivli (E),Mumbai 400 101
M/s. John Deere India Private Limited,Unit: John Deere Pune Works,Off Pune-Nagar Road, Sanaswadi,Pune-412 208
M/s.Escorts Limited,15/5, Mathura Road ,Faridabad -121 003
M/s.Escorts Limited,15/5, Mathura Road,Faridabad -121 003
M/s.Escorts Limited,15/5, Mathura Road ,Faridabad -121 003
M/s Eicher Tractors,(A Wholly Owned Subdidiary of TAFE),Plot No. 1, Sector-D, Industiral Area,Mandideep Distt. Raisen -462 046 (M.P.M/s. Mahindra & Mahindra Ltd,Farm Equipment Sector,Akurii Road, Kandivli (E),Mumbai 400 101
M/s. Mahindra & Mahindra Ltd,Farm Equipment Sector,Akurii Road, Kandivli (E),Mumbai 400 101
M/s. Mahindra & Mahindra Ltd,Farm Equipment Sector,Akurii Road, Kandivli (E),Mumbai 400 101
13.04.21
15.04.21
10.05.21
02.06.21
11.06.21
11.06.21
25.06.21
25.06.21
DTK under preparation
Waiting for drawbar Test
Waiting for drawbar Test
Under test
Under hyd. test
Under brake test
Under PTO test
Under running-in test
Under running-in test
DTK in July, 21
DTK in July, 21
DTK in Nov, 21
DTK in Nov, 21
DTK in Nov, 21
DTK in Nov, 21
DTK in July, 21
DTK in July,, 21
DTK in Dec, 21
DTK in Dec, 21
DTK in Dec, 21
DTR allotted to AE(V).ofTline application
DTR allotted to Sh. Vithato,28/2020-21/66
Online Application
28/2020-21/26Online Application
28/2020-21/50
28/2020-21/55,
application,
28/2020-21/56,
application,
28/2020-21/54,
application.
Offline application
28/2021-22/17,Application,
28/2021-22/18,Application
28/2021-22/19,Application,
Online
Online
Online
Online
Online
Online
DTR Released
(February, 2021)DTR Released
(February, 2021)DTR released (June,
2021)
Page 8 of 14
List of applications withdrawn in 2021-22 up to June, 2021Annexure-6
Sl.No. Make & Model of Machine Type of Test Remarks
1 John Deere, 3036EN Tech. Ext Application No. 28/2021-22/1withdrawn on 15.04.21
2 John Deere, 3028EN Tech. Ext Application No. 28/2021-22/2withdrawn on 15.04.21
3 TAPE, MF-1035 DI M8 Variant Application No. 28/2020-21/61withdrawn on 28.04.21
4 Mahindra, NOVO 605 DI ICT Application No. 28/2020-21/67withdrawn on 18.05.21
5 Mahindra, NOVO 655 DI PP4WD
ICT Application No. 28/2020-21/68withdrawn on 18.05.21
6 Mahindra, Arjun 605 DI i ICT Application No. 28/2020-21/74withdrawn on 18.05.21
7 TAPE, MP 1134 Tech. Ext Application No. 28/2020-21/76withdrawn on 12.06.21
8 John Deere, 5310 VI Batch
(Variant)Application No. 28/2020-21/79withdrawn on 25.06.21
9 John Deere, 5310 V4 Batch
(Variant)Application No. 28/2020-21/80withdrawn on 25.06.21
Page 9 of 14
Tractor/Combine Harvester In-line for Testing
Offlin
S.
NO
e ADDlications:
Make & Model
of Machine
Type of
test
Application
received
date
Date of
completion
of pre-testformalities
Test fee
received
date
£
Date of
receipt
of
tractor
7
Date of
receipt
of
printedliteratu
-re
8
Remarks
91
1
2
Agrolux 60E2WD tractor
3
Variant
(Batch)(Variant ofAgromaxx60 4WD)
4
22.03.18
(Revised02.03.20)
5 o
06.01.20 The applicant has beenasked for submission
of tractor &clarification for
water temp. Letteisent on 29.05.20.
2 Agromaxx 4055E(8+8)
ICT 08.05.19 06.01.20 Letter has been sent
to the firm for seekingclarification forconsidering base &variant models. Letter
sent on 15.05.20.
3 Agromaxx 4055E(12+3)
ICT 08.05.19 06.01.20 Letter has been sent
to the firm for seekingclarification forconsidering base 8&variant models. Letter
sent on 15.05.20.
4 Agromaxx 4045E ICT 08.05.19 06.01.20 Letter has been sent
to the firm for seekingclarification for
considering base 8&variant models. Letter
sent on 15.05.20.
5 Agromaxx 4050E
ICT 22.07.19 06.01.20 Letter has been sent
to the firm for seekingclarification for
considering base &variant models. Letter
sent on 15.05.20.
6 Swaraj 855 FE i4x4
Variant 31.08.20 31.08.20 Letter sent to the firmon 16.09.20 forsubmission of tractor.
The C.R. Sh. DeepakDevre informed on31.05.21 that themodel is not underproduction.
7 International
Tractors Ltd.,Soils 60
OECD 03.12.20 Test sample selectedrandomly throughonline dated 29-06-2021
8 TAPE, 7515 4WD OECD 12.02.21 29-04.21 Selection scheduledsubmitted by theapplicant on 03-07-2021
9 TAPE, 8515 4WD OECD 12.02.21 29-04.21 Selection scheduledsubmitted by theapplicant on 03-07-2021
Onl
_
ine AoDlications:
2 3 4 5 6 7 8 9
10 VST SHAKTI, MT270 VIRAAT 4W
Batch 22.12.20 Pee paid 28/2020-21/31Approved. Testsample randomlyselected on
25.06.21 fiB Test
sample yet to bereceived.
Page 10 of 14
1 2 3 4 5 6 7 8 9
II"Eicher, 368 USJ Batch 29.12.20 Fee paid 28/2020-21/38
Approved. Testsample randomlyselected throughonline dated 29-06-
2021 & test sampleyet to be received.
12 Eicher, 551 Batch 29.12.20 Fee paid 28/2020-21/39Approved. Receivedschedule plan forrandom selection on
14.07.21.13 Eicher, 650 Variant 07.01.21 Fee paid 28/2020-21/43
Approved. Testsample randomlyselected throughonline dated 29-06-
2021 & test sampleyet to be received.
14 Swaraj, CODE SelfPropelledMultipurpose ToolBar
Conf . 16.02.21 28/2020-21/60Under Scrutiny andyet to be decided toadmit application.
15 Eicher, 485 USJ Batch 04.03.21 Fee paid 28/2020-21/62Approved. Testsample randomlyselected throughonline dated 29-06-
2021 & test sampleyet to be received.
16 Captain, 200 DI Batch 05.03.21 28/2020-21/63Under Scrutiny.Application pendingwith applicant forsubmission of
corrected
documents.17 International
Tractors Limited,Sonalika
International DI-26
Gardentrac
Tech Ext 05.03.21 28/2020-21/64Under Scrutiny.Application pendingwith applicant forsubmission of
corrected
documents.18 International
Tractors Limited,DI-35 HDM (BrandName : RX)
Batch 10.02.21 28/2020-21/69Under Scrutiny.Applicant hassubmitted corrected
documents on28.04.21 which areunder scrutiny.
19 International
Tractors Limited,Sonalika
International DI-30Baagban Super
Tech Ext 07.03.21 28/2020-21/70Under Scrutiny.Application sentback.
20 Escorts Limited,Euro 50
Tech Ext 11.03.21 Fee paid 28/2020-21/71Approved. Schedulesubmitted by theapplicant forrandom selection on
01.07.2021.21 Escorts Limited,
Euro 50Batch 11.03.21 Fee paid 28/2020-21/72
Approved. Receivedschedule for
random selection on
01.07.2021.
Page 11 of 14
22
23
24
25
26
27
28
29
30
31
International
Tractors
Limited, SonalikaInternational DI-30
Rx Baagban Super4WD
32
33
34
Batch 11.03.21
Ife,
International
Tractors Limited,DI-47 RX 4WD
Batch 16.03.21 Fee paid
International
Tractors
Limited, SonalikaInternational DI-35
RX CM Plus
Batch 19.03.21
ACE, DI 42 XT Batch
(Variant)20.03.21
Preet Tractors Pvt.
Ltd, 7549 Agritrac4WD
Batch 24.03.21
Escorts Limited,
Euro 41 E3
Batch 25.03.21 Fee paid
Preet, 3549Challenger
Batch 25.03.21
TAFE, MF 245 DI
S6 Smart
ICT 27.03.21 Fee paid
TAFE Ltd., MF6028 Max Pro
ICT 09.04.21
John Deere, 5050D | VariantVI
14.04.21
Tafe, MF 1035 DIM8
Variant 16.04.21
Captain, 250 DI Batch 19.04.21
4WD+
Mahindra, Jivo 305DI 4WD
Variant 23.04.21
28/2020-21/75Approved. Testsample selectedon dated 29-06-2021
28/2020-21/73^Under Scrutiny^Received schedule
for randomselection on
09.07.2021.
28/2020-21/77Schedule plansubmitted by theapplicant forrandom selection
on dated 06-07-2021
-21/7828/2020-2Approved. Theapplicant hasinformed that thistractor model willbe produced inJuly, 2021 andonce it will beassembled, theywill intimate forselection28/2020-21/82Under Scrutiny.Applicantsubmitted
corrected
documents
29.04.21
are
scrutiny.
has
on
which
under
-21/8328/2020-2Approved.Received schedule
for random
selection on
01.07.2021.
28/2020-21/84Ready forapproval.Received schedule
for randomselection on
01.07.2021.
28/2020-21/85Approved.Received schedule
for random
selection on
02.07.2021.
28/2021-22/3Under Scrutiny.Application sentback.
28/2021-22/4Under Scrutiny.Application sentback.
28/2021-22/5Under Scrutiny.Application sentback.
28/2021-22/6Under Scrutiny.Application sentback on 23.06.21.
28/2021-22/7Under Scrutiny.Corrected
documents
received which are
under scrutiny.
Page 12 of 14
1 35
1
TAPE, MF 246 DI ICT 28.04.21 28/2021-22/8Under Scrutiny.Application sentback on
23.06.2021.36 TAPE, MP 241 DI
Planetary plus V29Variant 30.04.21 28/2021-22/9
Under Scrutiny.37 ESCORTS
LIMITED, 26 ElVariant 05.05.21 28/2021-22/10
Under Scrutiny.Application sentback.
38 International
Tractors
Limited, SonalikaInternational DI-26
Gardentrac
Batch 05.05.21 28/2021-22/11Under Scrutiny.Application sentback.
39 John Deere ,5045D 4WD V2
Batch
(Variant)07.05.21 28/2021-22/12
Under Scrutiny.Application sentback.
40 John Deere ,52104WD Gear Pro
Variant 13.05.21 28/2021-22/13Under Scrutiny.Application sentback.
41 TAPE, MP 1134 Batch 14.05.21 28/2021-22/14Under Scrutiny.Application sentback.
42 TAPE, MP 1035 DIV13
Batch 14.05.21 28/2021-22/15Under Scrutiny.Application sentback.
43 Captain, Captain283 4WD
ICT 19.05.21 28/2021-22/16Under Scrutiny.Application sentback on
23.06.2021.44 VST Shakti, MT
932Conf. 23.05.21 28/2021-22/20
Under Scrutiny.Application sentback.
45 John Deere,
3028EN
Tech Ext. 24.05.21 28/2021-22/21Under Scrutiny.Application sentback.
46 John Deere,
3036EN
Tech Ext. 24.05.21 28/2021-22/22Under Scrutiny.Application sentback.
47 Swaraj, Swaraj 744PE 4x4
Variant 25.05.21 28/2021-22/23Under Scrutiny.
48 Escorts limited.Champion P6
ICT 28.05.21 28/2021-22/24Under Scrutiny.Pending withapplicant forsubmitting thereply ondiscrepancies.
49 Escorts Limited,EURO 42
ICT 03.06.21 28/2021-22/25Under Scrutiny
50 Escorts Limited,425 N El
Batch 15.06.21 28/2021-22/26Under Scrutiny
51 New Holland, 4710A2
Variant 19.06.211?^
28/2021-22/27Under Scrutiny
52 TAPE, TAPE 30 DIOrchard Plus V2
ICT 22.06.21 28/2021-22/28Under Scrutiny
53 Captain, Captain200 DI-HS
ICT 24.06.21 28/2021-22/29Under Scrutiny
54 Mahindra, 415 DI(Brand:Bhoomiputra)
Batch 25.06.21 28/2021-22/30Under Scrutiny
Note- Expected date of release of test report depend upon the date of receipt of test sample at this Institute.1. Total number of Applications received: 54
No. Of Applications received for ICT: 11No. Of Applications received for Conf: 02No. Of Applications received for Batch test: 22No. Of Applications received for variant Test: 10No. of Applications received for O.E.C.D. test : 03No. Of Applications received for Technical Extension : 06No. Of Applications received for Administrative Extension: 00
Page 13 of 14
2.
3.
4.
5.
6.
7.
8.
Annexure-7
List of CMVR Certificate issued on tractors during the month of June, 2021
SI. No. Make & Model of machine CMVR Certificate No. Date of
Certificate
1Nil
Annexure-8
List of Emission (Type Approval/COP) issued on Power tiller/tractors during themonth of June, 2021
81. No. Make fis Model of machine Emission (Type
Approval/COP)
Certificate No.
Date of Certificate
1Nil
(Y. K. RAO)
Senior Agricultural Engineer
Page 14 of 14
L
FARM ACTIVITIES FOR THE MONTH OF IIINE-YEAR 7071 -7077SI Name of crop, area covered
and yield during the previousyear (ha) (2020-2021)
Name of
crop, area
covered
during themonth
ha(2021-22)
Progressive areacovered & yieldfor different
crops during theyear 2021-2120
(ha)
Remarks
1 KHARIFl Paddy-Area-22.00 ha
■Yield 687.60
-
Faddy nurseiy raising work is inprogress.
2 Red gram -Area-2 ha.
- -
Received Rs.67245 from auctionof Red gram.
RABI: 1 Gram JG-130Area-6.8 ha
-
-
Received Rs.227040 fromauction of Gram.
2 Wheat Area-20.00 ha -
-
Received Rs554 7 3 03 fromauction of wheat.
Zaid 1 Moong Area 5.94ha
--
Received Rs.28800 From sale ofmoong among staff.crop yield
yet to be auction.2 Orchard 1 SapotaArea -
5.99 ha.Tree/Plant-307
Nos.
——
Crop is in vegetative stage.
2 Jack fruitArea-1.46 ha.
Tree/Plant -109Nos
——
Crop is in vegetative stage.
3 MangoArea - 0.96 ha.
Tree/Plan -84Nos.
— —
Crop is in vegetative stage.
4 LemonArea - 0.67 ha.Tree/Plant - 24
Nos.
— —
fruit setting was not proper onlyfew plant bear fruits.
3 5 Orange Area -3.20 ha.
Tree/Plant -440Nos.
——
Crop is in vegetative stage.
4 Weather Rain fall received during the month is 261.4m.m. and cummulative rain recorded tilldate 30.06.2021 is 261.4 m.m.
5Revenue During the month,revenue received Rs.870388/ The cummulative revenue till date
30.06.2021 is Rs 1981684/
-IJaibir SinghAgronomist
1 >1
CENTRAL FARM MACHINERY TRAINING & TESTING INSTITUTE, BUDNI (M.P.)STAFF POSITION for the Month of lune. 2021 fAs on 30.06.20211
SI.
No
Group Sanctioned
strengthFilled Vacant Remarks
1 A 14 10 4 * 10 Nos. Newly Created posts vide Ministry's letter No.1-9/2009-M&T (Admn) dated 06.05.2016.*01 No. Newly Created post of STA vide Ministry'sletter No. 12-12/2015-M&T(Admn) dated 01.05.2019.
2 B 9 9 1
3 BfNGl 20 18 2
4 C 92 71 21
5 MTS (T)-Outsource
04 04 0
TOTAL 139 112 28
DETAILS OF VACANCY POSITION
Name of the Post Sanctioned
strengthFilled No. of
VacancyDate since
vacant
Reason for vacancyoccurred
Remarks
GROUP 'A' GAZETTEDl
Director 1 1 0 — — ~
1
01.08.2016
(Revived videMinistry's letter
dated
30.01.2020)
Vacancy occurreddue to retirement
on superannuationofShri H.L. Yadav.
Ministry isthe
AppointingAuthority.
Sr. Agricultural6 2
1
07.08.2019 Vacancy occurreddue to repatriationof Dr. Mukund
Narayan (Ondeputation)
Ministry isthe
AppointingAuthority.
Engineer
1
01.10.2019 Vacancy occurreddue to retirement
on superannuationof Shri R.K. Ram,
SAE.
Ministry isthe
AppointingAuthority.
1
01.04.2020 Vacancy occurreddue to retirement
on superannuation
of Shri R.M Tiwari,SAE.
Ministry isthe
AppointingAuthority.
Agronomist 1 1 0 — — —
Senior
Instrumentation
Engineer
1 1 0 - -
Assistant Director
(Official Language) 1 1 0 - - "
Test Engineer 1 1 0 — — -
Instrumentation
Engineer Gr.II3 3 0 - -
-
GROUP 'B' fGAZET
AgriculturalEngineer
TED)
6 7^ 0-
~
#Includingone
additionalnnQt"
Agricultural Engineei(Instrumentation)
1 0 1 05.06.2021
Vacancy occurreddue to transfer ofregular incumbentShri Kantender
Dobriyal toNRFMT&TI. Hisar
Ministry isthe
AppointingAuthority.
Assistant Libraryand Information
Officer
1 1 0"
~
Administrative
Officer1 1 0
~-
—
mmim-GROUP 'W (NGJ " "
Senior Technical
Assistant13 13 0 -
~ —
Senior Technical
Assistant
(Instrumentation)2 2 0 ~
"-
StenographerGrade-I
3 2 1 08.03.2019
Vacancy occurreddue to promotion ofShri Vijay Yadav tothe post ofAdministrative
Officer by Ministry.
As perMinistry'sletter no.
12-
6/2019-M&T(Admn.) dated12:04.2021
the post isto be re-
advertised
for
deputationincludingshort term
contract
which is
under
process.
Office Supdt. 2 1 1
01.11.2014
& Revived on
09.01.2019
Vacancy occurreddue to retirement
on superannuation
of the regular heldincumbent.
Recruitment action
for fillingup of the
vacancy on
promotion
basis is inunder
process.
GROOUP'C
Technical Assistant20.04.2021
Vacancy occurreddue to promotion ofregular heldincumbent (Smt.BinduRahangdale)to the post of STA
Ministry isthe
AppointingAuthority.
AgriculturalAssistant
UDC
Compounder
Senior Technician 24 23 30.01.2021
Vacancy occurreddue to promotion ofregular heldincumbent (ShriLiban Lakda] intohigher post ofTechnical Assistant
and Transfer to
Assam Institute.
Ministry isthe
AppointingAuthority.
LDC
04.11.2013 &
Revived on
09.01.2019
Vacancy occurreddue to promotion ofShri Sunil Kumar
Choudhary to higherpost.
Ministry isthe
AppointingAuthority.
01.04.2016
& Revived on
09.01.2019
Vacancy occurreddue to transfer on
promotion of Shrikl. Dhurve at HisarInstitute,
Ministry isthe
AppointingAuthority.
04.11.2016
(Revived videMinistry's letter
dated
30.01.20201
Vacancy occurreddue to promotion ofregular heldincumbent (ShriO.N. Aryal.
Ministry isthe
AppointingAuthority.
07.11.2016
(Revived videMinistry's letter
dated
30.01.20201
Vacancy occurreddue to promotion ofregular heldincumbent (Smt.Madhuri Sharmal.
Ministry isthe
AppointingAuthority.
01.02.2019
Vacancy occurreddue to retirement
on superannuation
of Shri Ashok L.
Barapatre.
Ministry isthe
AppointingAuthority.
24.02.2021
Vacancy occurreddue to selection on
higher post ofregular incumbenti.e. Shri Sunil Kumar
Pradhan on the postof LIA and posted toNERFMT&TI,Assam.
Ministry is
the
AppointingAuthority.
Technician 6 b 0
MTS (Tech)10 4
2
31..01,.201.7
IRevived videMinistry's letter
dated30,01.20201
Vacancy occurred dutto selection on higherpost of regulatincumbent. (SanodiyaBaraskarl.
Ministry istheAppointingAuthority.
1 1,8.06.201.9
Vacancy occurreddue to selection onhigher post ofregular incumbent.[ShriGovindVishwakarmaJ.
Ministry istheAppointingAuthority.
t 01,.I0.2079
Vacancy occurreddue to selection onhigher post ofregular incumbent.[ShriArvind KumarOdel.
Ministry istheAppointingAuthority.
1 25.07.2020
Vacancy occurreddue to selection onhigher post ofregular incumbent.(Shri PraveenDhote.
Ministry istheAppointingAuthority.
1 06.08.2020
Vacancy occurreddue to selection onhigher post ofregular incumbent.[Shri Viiav.
Ministry istheAppointingAuthority.
MTS (Non-Technical)
30 23
1 0'1,.01.2020
Vacancy occurreddue to retirementon superannuationof Shri JamunaFrasad Yadav
Ministry istheAppointingAuthority.
1 01.01.2020
Vacancy occurreddue to retirementon superannuationof Shri DevkiNandan Dubey,
Ministry istheAppointingAuthority.
1 0L.06.2020
Vacancy occurreddue to retirementon superannuationof Shri KailashChandra Patel.
Ministry istheAppointingAuthority,
1 01.09.2020
Vacancy occurreddue to retirementon superannuationof Shri Madanlal
Ministry istheAppointingAuthority.
1 05.09.2020
Vacancy occurreddue to selection inanother departmenton higher post ofregular incumbent.lShri Bittu Kumarl
Ministry istheAppointingAuthority.
1 01.06.2021
Vacancy occurreddue to resignationtendered by ShriVijay.
Ministry isthe
AppointingAuthority.
1 01.06.2021
Vacancy occurreddue to resignationtendered by ShriNarendra Singh
Ministry isthe
AppointingAuthority.
MTS [Tech]outsource
4 4 0-
-
Total96 75 21
Grand Total 139 112 28
Administrative Officer
w
nRTATLS OF COURT CASES FOR THE MONTH OF JUNE. 2021
Name of Office
Name of Director
Telephone No.
Central Farm Machinery Training 85 Testing Institute,Budni (M.P.)
Shri P.K. PANDEY
1 +91-7564-234729
SI.
No.
Case
No./Court/Branch
Name of the
partiesBrief Issues Name of
Govt.
Counsel
Remarks
CAT, Jabalpur
(CAT/633/20)
Bharat SinghKachhuwahe &
Others
MoA&FW
Others
Vs
Petitioners had applied for the postof STA. They were earlier not foundeligible as per merit list drawn by theDSC for the said examination
Dissatisfied with their non-shortlisting for the skill & proficiencytest for the post of STA, thecandidates have filed the O.A. atHonlDle CAT, Jabalpur.
Shri
Singh,Advocate
Jabalpur
S.P. The final reply isyet to be filled.The Hon^ble
CAT vide order
dated
21.06.2021 has
made clear that
this Tribunal
has not stayedthe action of the
respondent. Thelearned counsel
for the applicanthas been
granted threeweek's time to
file rejoinder.The case is
listed for orders
on 28.07.2021
CGIT and Labor
Court,Jabalpur
(CGIT/LC/R/46/2016)
Radha Kishan
Kewat Vs
CFMTTI
Daily Paid Casual Laborer forengagement of work
Shri P.
Shankaran
Nair,Advocate
Jabalpur
The date for
statement of
claim of
workman has
been given as20.04.2020.
The next date of
hearing shall beinformed as
soon as received
from the Govt.
Counsel.
3, CAT, Jabalpur
(OA No.200/90/2019)
P. Rishi Prakash The Mahila Police station Sadar,Distt. Samastipur on the ground ofmatrimonial dispute between theapplicant and his wife has registeredCrime No. 19/2017 dated05.07.2017 and arrested by thePolice and kept under their custodyfor more than 48 hours. Therefore,according to CCS (CCA) Rules, 1965,the Petitioner was deemed to have
been placed under suspension.Aggrieved by the decision of theAppointing Authority the petitionerhas filed the present case.
Shri P.
ShankaranNair,Advocate
Jabalpur
The Counter
reply hasalready filed.The Hon'ble CAThas alreadyordered on14.01.2020 thatthe applicantmay file the
rejoinder, if any,in the meantimeThe matter wasposted for orderson 30.03.2020.
Post Covid
status not
updated.
• >
CAT, Jabalpur
L.
O.A/200/0004/2020)
Kusum Pawar
Vs MoAFW 85
others
Labour court,
Hoshangabad
(02/WCA/21»p»
Devman
Gadekar Vs UOI
& Ors.
(WP No.11152/2009
Har NarayanMalviya Vs UOI& Ors
(WP No.818/2014)
Har NarayanMalviya Vs UOI& Ors
(WP No.3479/2014)
The Respondent No 2, CFMTTI, asubordinate office of Respondentno.l MoA&FW has one vacant postof "Compounder". Which was notifiedin the Employment News and also onFMTTls websites and Newspapers.The applications received from thecandidates were scrutinized and
eligible candidates were called forwritten tests and proficiency testswhich were conducted by theSelection Committee of the Institute
Geeta Kushram
8c, Others Vs UOI
and CFMTTI,
Budni,
High CourtJabalpur (M.P.)
High CourtJabalpur (M.P.
High CourtJabalpur (M.P.)
The Ministry has not issued anyProvisional Appointment Order andinstead, a communication wasissued to the Institute in which the
Institute was asked to cancel the
entire recruitment process of thesaid post with instruction to reprocess afresh for recruitment of thevacant post. That as per instructionof the ministry, it was observed bythem that the vacant post of'Compounder' earlier informed by theMinistry as from OBC Category forprocessing the recruitment matter,in fact, falls under Un-ReservedCategory according to the RR of thevacant post. On observing this flawin the Roster Position, the Ministryhas instructed the Institute to cancel
the earlier Recruitment Process andre-process afresh for the recruitmentof the vacant post from Un-ReservedCategory as per the Roster position,hence department wanted to abideby cancelling the recruitmentprocess in hand. The Applicantunder selection was informed of thisdecision. Aggrieved by the decisionthe petitioner filed the present case.
The Petitioner has filed the case dueto death of her husband working inthis Institute on works contract
basis.
Termination of Ex-Chowkidar-cum-Farm mate
Entry in Technical Higher Educationdue to non-validity of University.
ACP Case
Shri
Singh,Advocate
Jabalpur
S.P.
S.S.Shri
Rajput,Advocate
Hoshangabad
Shri AnoopNair,Advocate
Jabalpur
Shri Rashid
Suhail
Sidiqi,Advocate
Jabalpur
Shri Rashid
Suhail
Sidiqi,Advocate
Jabalpur
The final replyhas been filed on
04.03.2020.
Hon'ble CAT fixed
up the date fornext hearing /order as
05.05.2020. The
applicant hasbeen granted fourweeks' time to file
rejoinder. PostCovid status not
updated.
The case for
hearing waslisted on dated
25.06.2021 8s
next date for
hearing is given27.07.2021.
The Counter
reply filed by theadvocate.
Pending for dateof hearing
The Counterreply filed by theadvocate.
Pending for dateof hearing
The Counterreply filed by theadvocate.
Pending for dateof hearing
Administrative Officer