STATE COLLEGE AREA HIGH SCHOOL 60% Progress Report

27
STATE COLLEGE AREA HIGH SCHOOL 60% Progress Report Centre Region Council of Governments AGENDA 01 Site 02 Building Design 03 Sustainability 04 Cost 05 Phasing 06 Summer 2015

Transcript of STATE COLLEGE AREA HIGH SCHOOL 60% Progress Report

STATE COLLEGE AREA HIGH SCHOOL60% Progress ReportCentre Region Council of Governments

AGENDA01 Site02 Building Design03 Sustainability04 Cost05 Phasing06 Summer 2015

01

02

03

04

05

06

SITE

BUILDING DESIGN

SUSTAINABILITY

COST

PHASING

SUMMER 2015

OVERALL SITE PLAN

SITE DESIGN

60% DESIGN

REFINEMENTS IN … PARKINGACCESS / DELIVERIESBUS ACCESSIBILITYGRADING / UTILITIESTRAFFICLANDSCAPINGPLAZA CONCEPTS

1.02

NORTH SITE PLAN

NORTH – EXTERIOR

SOUTH SITE PLAN

SOUTH – EXTERIOR

01

02

03

04

05

06

SITE

BUILDING DESIGN

SUSTAINABILITY

COST

PHASING

SUMMER 2015

NORTH – EXTERIOR

NORTH – INTERIOR

SOUTH – EXTERIOR

SOUTH – INTERIOR

01

02

03

04

05

06

SITE

BUILDING DESIGN

SUSTAINABILITY

COST

PHASING

SUMMER 2015

SUSTAINABILITY

3.01

01

02

03

04

05

06

SITE

BUILDING DESIGN

SUSTAINABILITY

COST

PHASING

SUMMER 2015

BUDGETState College Area High SchoolSchematic Design Construction Cost Estimate - 30% Design Documents CRA #2787Crabtree, Rohrbaugh & Associates 12/3/2014

Executive Summary

I South BuildingThe South Building will house 2,500 students in grades 9-12 in a new / renovated High School. The project will consist of the following:a. Demolition of 103,000 sf of existing building areab. Renovations to 77,000 sf of existing building areac. The project will be a "LEED Gold" project d. Alternate Bid for 7,600 sf Auxiliary Gym, Fitness Center & Support Spacese. Site Development shall include new bus drop off, new parking areas, new signalized intersection new entrance plaza, new shop yard, site lighting, signage, and landscaping

II North BuildingThe North Building will retain existing competition athletic venues for the High School, including competition gym, natatorium, and auxiliary gym, with adjacent locker rooms.A two-story wing will be constructed for the Delta Program, housing students in Grades 5 - 12The North Building project will consist of the following:a. Demolition of the two-story academic wingsb. Construction of a 42,936-sf academic wing for the Delta Program (Original program area of 20,000 plus 22,936 for enhanced program.)c. Limited renovations to the existing athletic facilitiesd. Major renovations to the existing kitchen to serve the Delta Programe. Site development work will include upgrades to existing parking, new athletic field and expanded storm water management for the site

III Referendum EstimateIn May 2014, the voters of State College Area School District overwhelmingly approved a referendum to remain on the existing Westerly Parkway site and complete a major addition andrenovations project. Listed below are the estimates prepared for the referendum:

South Building: $100,254,365North Building: $14,623,516Referendum Limit $114,877,881Grant 2,000,000$ Board Approved 5,469,119$ Enhancements for Delta ProgramUpdated Budget 122,347,000$

Budget is being developed concurrently by MassaroConstruction Management & Crabtree Rohrbaugh.

Next budget revision will be completed in April.

South Building has reduced by approximately 5,000 SF since 30% submission.

North Building has increased by approximately 22,000 SF with addition of Delta Program.

$75.1M in bonds (Aa1) sold on Feb 17/18, yielding $85M in proceeds.

All-in True Interest Cost = 3.54% (25 yr)

Annual debt service = $5.2M

Estimated property tax impacts2015-2016 1.49 mills2016-2040 2.31 mills

01

02

03

04

05

06

SITE

BUILDING DESIGN

SUSTAINABILITY

COST

PHASING

SUMMER 2015

PHASINGJune 2015 – Aug 2015

PHASINGSept 2015 – Jan 2017

PHASINGJan 2017 – May 2017

PHASINGJune 2017 – Sept 2017

PHASINGSept 2017 – May 2018

PHASINGJune 2018 – Aug 2018

01

02

03

04

05

06

SITE

BUILDING DESIGN

SUSTAINABILITY

COST

PHASING

SUMMER 2015

SUMMER 2015 SITE PROJECT

6.01

Questions?

STATE COLLEGE AREA HIGH SCHOOL60% Progress Report