Project Proposal for Construction of a Hospital
By Group 7 –
ASHISH JHA - 20ISHANI DAS - 37
POOJA TIWARI - 53RAMYA RAVIKUMAR - 61
SHIVAM NIGAM - 72
ABHISHEK TIWARI - 84VINAY PILLAI - 86
Hospital – SEHAT Customer name – Dr Siya
BharadwajProject Co-ordinator -
Ms.Punya Awasthi
Project Background Ms. Siya Bharadwaj, a MBBS from AIIMS has come back to her home town Kanpur and wants to start a hospital at a small level of 20 bed capacity.
For this she has come to a professional Ms.Punya Awasthi, who has an experience in forming project proposal and helping in implementing it.
She has an aim to help people by taking care of health issue and a commercial aim to get at least 15% ROI.
Sehat Hospital Project Proposal Project Scope Statement :
Design, construct and equip a local hospital and securing necessary funds for constructions of a 20 bed capacity general hospital in the city of Kanpur. The project aims at providing an ROI of 15% and is to be started by 25th July 2014 by completing the project without exceeding the budget of 5.61 crores.
Sehat Hospital Project Proposal Project Objectives:• To complete the project within the time boundary i.e. 30th September 2015.
• To ensure that the project is completed within the given budget.
• To earn adequate return on investment.• To ensure that the supplies are timely.
Customers:
The customer or we can say beneficiaries of the project are the people in the region who don’t get good and timely medical facilities. This project will serve the men, women and children by providing the best health care facilities.
Sehat Hospital Project Proposal Summary of Economic Viability: • Phase 1: This phase involves running of a hospital for patients in the region. It is proposed to establish this 24*7 facility in a 5,000 square feet space in the region. The unit will have separate facilities for male, female and children. The estimated land cost is INR 70 lakh which is expected to be funded by Bhardwaj & sons and by bank loan.
Sehat Hospital Project Proposal• Phase 2: This phase involves the establishment of a 20 bed hospital in about 5000 square feet of land. The hospital will have a built up area of 5,000 square feet.
• Phase 3: This involves the recruitment and marketing.
• The estimated project cost is 5.61 crores.• This whole project is a health care facility so focus is not on profit gain. But since the sponsors are involved so this project aims at 15% ROI.
Sehat Hospital Project Proposal Preliminary Stakeholders Analysis• Project Sponsor: Kashinath Bharadwaj, Executive Vice President, Bhardawaj & sons
• Bank: HDFC Bank• Project Manager: Ms. Punya Awasthi• Key person of project: Ms. Siya Bharadwaj
Deliverables Description
Deliverable 1- System Design
Study the hospital’s requirement and
needs.
Getting statutory approvals.
Deliverable 2 - Construction Procurement of land
Legal Approval
Hiring an Architect for designing
Hire a contractor for construction
Deliverable 3 – EquipmentQuotations and Contracting from
Vendors for various Equipments
Furnishing
Ambulance, stretchers etc
Deliverable 4 – staffing and
marketing
Recruitment of specialists,
administrative staff, supporting
staff etc.
Advertising through newspapers and
local television channels
Deliverable 5- Analysis
Analyzing at each step that the
project is running as per
objective.
Cost of Project Total (in Rs.)
Land cost@ 990 per sq. feet 0.70 crores
Construction cost 1.20 crores
Machinery & equipment 1.96 crores
Furnishing 0.90 crores
Vehicles 0.22 crores
Contingencies – 5 %
construction cost
0.06 crores
Funding operating losses 0.50 crores
Recruitment 0.02 crores
Advertising 0.05 crores
Total estimated project Cost 5.61 crores
Sehat Hospital Project Proposal
Cost Break down as per different major activities or materials
involved
Material / activity involved Cost (in Rs.)
LAND @ Rs.990 / square feet 7000000
Construction:
Contract to a regional
contractor (raw material,
labour etc.)
3200000
Machinery & equipment
25 Hospital bed 250000
25 Bench 2500
5 Cabinet 30000
2 Conference table 25000
2 Emergency trolley 1000000
5 Executive chair 180000
30 stool 45000
2 Waste paper tub 700
5 Oxygen set 5000
2 Binocular microscope 33000
1 Glucose analyzer 32000
2 Weighing scale 9800
1 Water distiller 120000
5 Surgeons stool 5000
2 ICU bed 150000
2 ECG Monitor 740000
2 Syringe pump 15000
3 ventilator 1200000
ICU instruments 1000000
Furnishing
30 Fan 36000
1 Air conditioner 22000
2 LED 8000
Wooden furniture (table, sofa,
chair etc.)150000
Vehicles
2 Ambulance 1500000
Recruitment
Expense on advertising for
recruitment + per head interview
scheduling cost
2000000
Advertisement
Newspaper n(half page in TOI) 1212750
Hoarding ( GT road) 336000
Cash INFlow• Expected patients per day- 10• Average charges-
Appointment fee- 100 RsSpecial appointment- 300 Rs
Sehat Hospital Project Proposal
Milestone DescriptionMonth
sStart Dates
Phase 1 –
Construction
Confirm the needs and
project plan1
25th July 17,
2014
Acquisition of land, carry
out site development.2
25th August
2014
Obtain necessary statutory
approvals.2
25th October
2014
Prepare Master Plan and
building construction
plans.
825th November
2014
Phase 2 –
EquipmentEquipment 2 25th June 2015
Furnishing 1 25th July 2015
Phase 3 –
Staffing and
Marketing
Recruitment and Training. 2 25th July 2015
Marketing 2 25th July 2015
Sehat Hospital Project Proposal WBS For Construction of Hospitals1. Confirm the needs and project plan
Confirm the needs for the service of the hospital.
Confirm the market size, quality of services and the capacity to serve.
Prepare cost estimates and check with the estimated budget.
Prepare a preliminary schedule. Verify the cash flow and the project feasibility assumption.
Sehat Hospital Project Proposal2. Acquisition of land, carry out site development.
Evaluate available sites and select the site.Negotiate the land acquisitions with the suppliers and purchase of the land.
Soil testing and land classifications.Architectural drawings.Approvals and permit.Site development.▪Arrange water.▪Arrange Electricity.▪Construct boundary walls and fence.
Sehat Hospital Project Proposal3. Obtain necessary statutory approvals.
Receive approvals for construction of the plan.
Receive approvals from the board of medical sciences.
Receive Electricity supply approvals Receive approvals from the water supply authority
Sehat Hospital Project Proposal
Prepare Master Plan and building construction plans. Select and appoint architect.▪Prepare overall Floor-wise layout plan.
▪Construction details for lintels, staircase, walls windows and doors.
▪Colour schemes.▪Specification for flooring, fittings and fixtures.
▪Prepare electrical cables layouts▪Prepare fire escape and sprinkler layout plans.
▪Prepare air conditioning scheme and ducting layouts.
Sehat Hospital Project Proposal Carryout Construction activities at the site.▪Select the prime contractor.▪OP Block▪Clinical Block▪Clinical lab block▪ICU block▪General Ward (Male)▪General Ward (Female)▪Admin Block ▪Doctors Block
Sehat Hospital Project Proposal
Equipment and Furnishing Equipment▪Vendor Quotations▪Contracting with vendors▪Medicals contracting
Furnishing▪Prepare the master plan for interiors decoration.
▪Install Reception▪Install Room Furniture. – Beds, saline etc.
▪ Install ICU’s▪Install Doctors room and others.
Sehat Hospital Project Proposal
Recruitment and Marketing Recruitment and Training.▪Doctors▪Nurses▪Clerks▪Accountants▪Human Resources▪Drivers
Marketing▪Print media ▪Pamphlets▪News papers
▪Outdoor advertisements▪Hoardings
Sehat Hospital Project Proposal Assumptions Risks :
The staff may not be professional enough to handle the equipment with care.
Delay in getting the necessary approval for construction of the hospital.
The necessary resources may not be delivered on time.
Sehat Hospital Project Proposal
Time constraint while recruitment and selection of staff.
Mismatch between demand and supply The loan sanction might get delayed from the bank.
Prices of raw materials , interest rates might increase in case of inflation
Political changes.