DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
1
Fabrication of all sizes of pipe lines, job includes
marking/ cutting, edge preparation, shifting of
material at work site for erection purposes,
including all consumables like Electrodes, DA &
Oxygen gas etc.
a) CARBON STEEL PIPING
i) Upto & including Sch.40 Inch dia 15000.00
ii) Above Sch. 40 upto & including Sch.80 Inch dia 350.00
iii) Above Sch. 80 Inch dia 10.00
b) STAINLESS STEEL. PIPING
i) Upto & including Sch.40 Inch dia 2380.00
ii) Above Sch. 40 upto & including Sch.80 Inch dia 65.00
iii) Above Sch. 80 Inch dia 5.00
c) ALLOY STEEL PIPING
i) Upto & including Sch.40 Inch dia 17.00
ii) Above Sch. 40 upto & including Sch.80 Inch dia 5.00
iii) Above Sch. 80 Inch dia 5.00
2
Fabrication of pipes (X-ray quality) of all sizes of
pipe lines, root run should be TIG welding. Job
includes marking/ cutting of edge preparation,
shifting of material at work site for erec-tion
purposes including all consumables like Electrodes,
DA & Ox
a) CARBON STEEL PIPING
i) Upto & including Sch.40 Inch dia 3.00
ii) Above Sch. 40 upto & including Sch.80 Inch dia 3.00
iii) Above Sch. 80 Inch dia 3.00
b) STAINLESS STEEL. PIPING
i) Upto & including Sch.40 Inch dia 11.00
ii) Above Sch. 40 upto & including Sch.80 Inch dia 5.00
iii) Above Sch. 80 Inch dia 2.00
c) ALLOY STEEL PIPING
i) Upto & including Sch.40 Inch dia 2.00
ii) Above Sch. 40 upto & including Sch.80 Inch dia 2.00
iii) Above Sch. 80 Inch dia 2.00
3
Erection of GI/CS/AS/SS pipe lines, including
lifting, placing of pipes on the sleepers, racks at all
elevations, levelling & aligning jointing of
flanges/screwed fitting including fixing gaskets and
bolting,opening and boxing up of flanges.
a) Upto Sch. 20 Inch Mtr 25.00
b) Above sch. 20 upto & including Sch.40 Inch Mtr 12700.00
c) Above Sch. 40. Inch Mtr 275.00
IN FIGURE IN WORDS
SCHEDULE OF QUANTITIES FOR ARC MISC MECH JOBS FOR THE YEAR 2013-14
ANNEXURE-I
Sr.No.
1 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
4 a) Straight, Gas/Electric Cutting of M.S.
i) Plate thickness upto 4 mm MR 565.00
ii) Above 4 mm upto 6 mm " 1230.00
iii) Above 6 mm upto 10 mm " 950.00
iv) Above 10 mm upto 14 mm " 265.00
v) Above 14 mm upto 20 mm " 700.00
vi) Above 20 mm upto 24 mm " 2.00
vii) Above 24 mm upto 30 mm " 97.00
viii) Above 30 mm upto 50 mm " 60.00
4 b) Straight cutting with Electric of S.S. Plate
i) Plate thickness upto 4 mm MR 127.00
ii) Above 4 mm upto 6 mm " 30.00
iii) Above 6 mm upto 10 mm " 8.00
iv) Above 10 mm upto 14 mm " 2.00
v) Above 14 mm upto 20 mm " 1.00
vi) Above 20 mm upto 24 mm " 2.00
vii) Above 24 mm upto 30 mm " 1.00
5
Straight welding for repair of CS plate of pipe
for making hoppers etc.including erection if
required.
a) For Carbon Steel.
i) Plate thickness upto 4 mm MR 146.00
ii) Above 4 mm upto 6 mm " 720.00
iii) Above 6 mm upto 10 mm " 515.00
iv) Above 10 mm upto 14 mm " 250.00
v) Above 14 mm upto 20 mm " 450.00
vi) Above 20 mm upto 50 mm " 84.00
5 b)
Straight welding for repair of SS plate of pipe
for making hoppers etc.including erection if
required.
i) Plate thickness upto 4 mm MR 74.90
ii) Above 4 mm upto 6 mm " 11.50
iii) Above 6 mm upto 10 mm " 11.30
iv) Above 10 mm upto 14 mm " 1.00
v) Above 14 mm upto 20 mm " 1.00
6 a) Fabrication of CS Pipe bends upto Sch. 80 by
sand filling and heating.
i) 1/2" Bend No. 650.00
ii) 3/4" Bend " 209.00
2 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
iii) 1" Bend " 82.00
iv) 1-1/2" Bend " 7.00
v) 2" Bend " 1.00
b)Fab of S.S Pipe bends above Sch. 80 by sand
filling and heating.
i) 1/2" Bend No. 16.00
ii) 3/4" Bend " 50.00
iii) 1" Bend " 3.00
iv) 1-1/2" Bend " 1.00
v) 2" Bend " 1.00
7
Opening end cover of heat exchangers at all
elevations, removing the same and placing them on
wooden pieces at near by places, re-erection them
after inspection. End cover flange OD shall be
taken as the diameter of the End cover. Job such
as cleaning of
a) Above 18" dia upto 24" dia.
i) 0-25 kg/cm2 No. 24.00
ii) Above 25-64 kg/cm2 " 1.00
iii) Above 64-100 kg/cm2 " 1.00
7 b) Above 24" dia upto 36" dia
i) 0-25 kg/cm2 No. 36.00
ii) Above 25-64 kg/cm2 " 2.00
iii) Above 64-100 kg/cm2 " 2.00
7 c) Above 36" dia upto 60" dia
i) 0-25 kg/cm2 No. 27.00
ii) Above 25-64 kg/cm2 " 1.00
iii) Above 64-100 kg/cm2 " 1.00
7 d) Above 60" dia upto 108" dia
i) 0-25 kg/cm2 No. 26.00ii) Above 25-64 kg/cm2 " 1.00
iii) Above 64-100 kg/cm2 " 1.00
7 e) Above 108" dia
i) 0-25 kg/cm2 No. 3.00
ii) Above 25-100 kg/cm2 " 1.00
8 Surface condensors
Opening of end covers of surface Condensers at all
elevations, removing and re-erection of the same
after inspection. (One end cover of surface
condensors consists of two halves and the job also
includes opening and boxing up and center line
bolts of each end cover.
a) 60" dia up to & including 80"dia. NO. 7.00
b) Above 80"dia upto & including 100"dia NO. 2.00
c) Above 100"dia upto & including 120"dia NO. 6.00
3 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
9
Removal of heat exchangers tube bundle, from all
elevations, after removing all obstructions if any,
and placing it at nearest safe place and re-erection
it after cleaning the gasket seat and boxing up with
new gasket. Cranes shall be given by NFL free o
MT 1.00
10
Opening, making gap in the flanges, manholes of all
sizes and boxing up of the same with new gasket
etc.
i) For upto 600 lbs rating Inch dia 15982.00
ii) For above 600 lbs rating " 183.00
iii)
Opening of all size flanges rating up to 2500 # filled
with leaksealing material such as flages of
valves,rotameter,magnetic flow meter,oval-
Gearmotor,control Valves,Safety Valves, Steam
Traps,non Return Valves at all elevations in plant
and placing it at
" 400.00
11
Opening and boxing up of bolts and nuts for
different sizes (other than the flanges of vessels
etc.) but including top cover/bottom flanges made of
6~25mm plate of various tanks like KT,UT,lube oil
consoles,ID Fan/FD Fans, Acid/Alkali dilution tanks,
duc
i) Bolt size upto 12 mm No. 1400.00
ii) Bolt size above 12 mm upto & including 20 mm. " 350.00
iii) Bolt size above 20 mm upto & including 32 mm. " 290.00
iv) Bolt size above 32 mm upto & including 50 mm. " 400.00
12
Fabrication & erection of steel structures & columns
like stair cases, railing, machine foundations,
conveyor structure,ladders, platforms, walkways,
pipe supports & stiffners etc. as per drawing & as
per the direction of Engineer-in-Charge.
MT 35.00
13
Fabrication & erection of chutes of conveyors,
hoppers, spool pcs., connecting pcs. of R.C. feeder
out let, vibrofeeder pans, RC feeder inlet square
piece duct or any such component out of plate of 5
to 25 mm thick plate as per drawing or sample as
per thi) MS /CS Plate MT 5.00
ii) S.S. Plate MT 1.00
14 a)
Dismantling of vessels/strainers Body/ equipments.
This include flange opening,removal of strainer
element,cutting, welding if any as per the instruction
of Engineer-in-Charge
MT 23.00
b)
Erection of vessels/strainers Body/ equipments.This
include boxing up of flange, strainer element,
providing supports, cutting-welding if any as per the
direction of Engineer-in-Charge.
MT 23.00
15Dismantling of old structures or part of vessels
including as cutting etc. and shifting the scrap to
scrap yard or atsite or to the main Stores.
MT 125.00
4 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
16
Erection of pre-fabricated structures & gratings,
shifting it to site placing on the foundation, levalling
& bolt tightening etc. Cutting & welding of
prefabricated gratings as per the site requirement is
also included.
MT 142.00
17 a)
Dismantling of all size of flanged valves,
rotameters, magnetic flow meters oval-gear motors,
control valves, safety valves, steam traps non return
valves, at all elevation inplant on placing it at the
nearest safe place.
i) Dismantling upto 600 lbs rating. Inch dia 1200.00
ii) Dismantling above 600 lbs. rating. " 55.00
17 b)
Refixing of all size of flanged valves, safety valves,
steam traps non return valves etc, at all elevation
inplant with new gasket as per the instruction of
Engineer-In- Charge.
i) Re-fixing upto 600 lbs. rating. " 1250.00
ii) Re-fixing above 600 lbs. rating. " 55.00
18
Shifting of equipment spares, equipment (new or
old), grinding media, scrap etc. from all elevation in
the plant to other point or vice-versa, as per the
direction of Engineer-in-charge. Contractor has to
make their own arrangement for shifting the
material.
a) From store to plant or back to store MT 85.00
b) From one plant to other plant MT 45.00
c)Within the plant from ground level toall elevation &
vice versa.MT 80.00
d)From W/Shop, Stores, Plant to R.W.F. Plant/T/Ship
and vice versaMT 4.00
e)From W/Shop, Stores, plant to Final treated pond
pump house and vice-versa.MT 2.00
19
Replacemeent of ID Fans Blower motor UGB-304
A~D at the top of prilling tower. The job involves
removal of top skirt, fan, motor and fixing back the
overhauled motor and also shifting of motor, fan,
skirt etc from ground floor to top of Prilling Tower
NO. 4.00
20
Dismantling of pipe (CS,SS, AS etc.)including
opening of bends, welded valves steam traps,
flange, screwed joint cutting supports and cutting of
pipes with gas or hacksaw in the following sizes in
various thickness & shifting to scrap yard.
Inch Mtr 8100.00
21Fabrication of all types of CS flanges by gas cutting
only.
a) Upto & including 13 mm thick Inch Dia 32.00
b) Above 13 mm thickness Inch Dia 580.00
5 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
22
Testing of Intercooler, oil cooler of IGB 101, 102,
104, AGB-601,AGC-601, BFW section AGA-701A &
B , UGA-102 A/B.
a)
Removal of Inter Cooler from position, opening of
end covers, making arrangmeent for hydraulic
testing, plugging of leaky tubes and installation
there after.
NO. 1.00
b)
Opening of end covers of cooler in situ, fixing blinds
on all connecting lines, making arrangement for
hydraulic testing, plugging of leaky tubes and fixing
back end covers, removal of all blinds there after.
NO. 1.00
23 Cooling Towers CT1, CT2 & CPP Cooling
Towers.
a)
Shifting of gear box from Store, Mech.W/Shop or
plant area to top of Cooling Tower making of
scaffolding and removal of blades anlogwith hub, oil
lines, drive shaft assy for replacement of gear box.
Alignment motor to drive shaft and drive shaft to
gear b
NO. 1.00
b)Replacement of Oil Seal of Cooling Tower Gear
Box in Situ.Opening of cell cover, making of scaffolding and
dismentling and removal of drive shaft , removal of
gear box coupling, opening of seal cover and
replacement of seal with new one. Checking /
correction of alignment motor to drive shaft and
drive shaft to gear box.
NO. 1.00
24 Cooling Tower CT3
Shifting of gear box from Store, Mech.W/Shop or
plant area to top of Cooling Tower making of
scaffolding and removal of blades anlogwith hub, oil
lines, drive shaft assy for replacement of gear box.
Alignment motor to drive shaft and drive shaft to
gear box.
NO. 1.00
25
Replacement of chlorine gas cylinder on the
chlorinator stand with chain block and removal of
empty cylinders at CT1 &CT2 area / CPP area.
NO. 55.00
26
Replacement of Self Priming pumpSP-4L/ 3L with
overhaulled one. Its all gaskets are to be replaced
with new one. Pump alingment is to be carried out
up to the satisfaction of Engineer-in charge. NFL
shall provide overhaulled/ new pump and gasket
material
a) Replacement of pump and motor NO. 2.00
b) Replacement of pump only NO. 2.00
27
Shifting and replacement of Final pond area pump.
NFL will provide overhaulled pump and consumable
material like gasket, gland packings nuts and bolts ,
shims etc free of cost.
a)Replacement and alignment of JohnstonTurbine
pump-MGA-323. Motor rating 110 KW, suspended
length about 5 Meter.
NO. 5.00
b)Replacement and alignment of SAM pump"Vertical"
Motor = 30 KW, suspended length 3.2 MeterNO. 4.00
c)Replacement and alignment of SU pumpVertical,
Motor rating 11 KW, suspended length 2 Meter.NO. 7.00
6 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
28
Foam replacement in filter frame of Dust Chamber
on Prilling Tower, job includes opening of old filter,
removal of its damaged/ used foam, repair of
frames if any, fixing of new foam and fixing of these
frames on position.
NO. 115.00
29 CFD. REPAIR
a)
CFD Bed wire mesh replacement after tightening
with screws on pad plates including drilling/ welding
on C.S./ S.S. plates where ever required.M
2 1.00
b)
Stitching of CFD wire mesh on perforated plates
with GI wire. Wire mesh and GI wire shall be
provided by NFL free of cost.M
2 1.00
c)
Replacement of rubber belt skirts. Job inludes
opening of clamp to remove the old/ dmaged skirt
and cutting of new skirt out of belt of approx. 4 Mtr.
long and 0.75M wide punched holes 16mm dia X 10
Nos. and fixing up back as per the directed by Site
Eng
NO. 3.00
d)
Replacement/repair of special support beam of size
300x200x20mm below perforated plate of CFD. Job
includes cutting, welding of C.S./S.S. plates and
lifting of perforated plates.
MR 1.00
e)Strengthning of CFD support beam by inter
connecting with flats, channel with welding etc.MT 1.00
30
Opening of spray nozzles of towers, vesselsand
other area such as Pump house in Urea plant etc.
Boxing up of the same after cleaning at all
elevations.
30 a) Screw type nozzles of size upto 1". NO. 180.00
30 b) Flange type nozzles of sizes upto 3". NO. 28.00
31Removal of air cooler of Kobe Compressor& then
refixing after maintenance.NO. 1.00
32
Erection and dismentling of scaffolding for various
heights inside/ outside boiler furnance steam/ start
up heater or any other vessel including pipe racks
etc. which includes safe approach by ladder and
intermediate stay to carry out the work.
i) Below 10 Meter height M2 1680.00
ii) Above 10 M and below 25 M M2 70.00
iii) Above 25 M height M2 35.00
iv)
Inside of Colling Tower cell for repair and
replacement of gear boxes with wooden planks.
NFL shall provide wooden plank for the same.
Approx. area of one no is 12 Sq. M
NO 7.00
v)
Erection of scaffolding inside the boiler from ground
floor to superheater height to repair the superheater
tubes. Scaffolding material shall be provided by
NFL free of cost.
No. 1.00
33
Fabrication of Gratings of required size out of MS
flat as per drawing or according to the direction of
Engineer-In-charge. NFL shall provide MS flat free
of cost. However all other consumable like welding
electrodes etc are in the scope of contractor.
MT 1.00
7 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
34
Cleaning of equipment such as pumps,
compressors, Blowers, Centrifuges, Heat
Exchangers internals, Bowl mills , Crushers & ID,
FD Fans during overhauling/ maintenance.
M2 4583.68
35
Opening & boxing up of granulator at PT for
cleaning with proper safety precautions and as per
the instruction of Engineer-in-charge.
No. 45.00
36Shifting of oil filed Drum to Pump House /
Compressor House / Centrifuge floor at all floors.No. 40.00
37
Pulling of Urea lump CFD job involves pulling urea
lump from CFD while plant is running, putting rope /
slings around the lump & pulling it toward side with
chain block taking all precaution & wearing
protective clothing as hot molten urea may cause
burn
No. 3.00
38
Opening, removing & fixing back of HT motors in
Urea Plant (GB 302, & 303 )etc. at various
locations. It includes decoupling, lifting & taking out
from position, shifting to workshop, if necessary.
Fixing back in position, doing alignment to the
a) Without removing coupling. Each 1.00
b)Removing / replacement one or both coupling a.
Crane, Trolly etc. requiired from the job wll be Each 1.00
39
Replacement of Ammonia Feed Pump gearbox with
coupling. Job includes bolts removal of old gear
box and removal of coupling halves. Fixing these
halves on repaired / new gear box. Placement of
gear box on position. Alignment of driver an driven
side up to
No. 1.00
40
Replacement of motor (Mechanical part) of
worthington pump MGA 311 ABC at pond No.1
including Shifting from store to site back.
No. 2.00
41
Sleeve replacement of worthington turbine pump
MGA - 311,after removing motor, gland repacking
and fixinf the motor back.
No. 2.00
42
Clamping on leaky steam water / alkali / Air / Dilute
acid lines at max. pipe rack elevation ground level
after fabrication (DM / ETP / SRP).
a) Piping 1" NB-4"NB No. 47.00
b) Piping 6" NB-8"NB No. 12.00
c) 8"NB-16"NB No. 2.00
43
Clamping of CT1 & CT2, CT3 distribution valve 16"
NB bottom rectangular discharge end with 20mm
plate & 4 nos bolts (Approx plate width=
18"X24"(maxm) with M 20 plates on running
header.
No. 21.00
44 Removal & fixing of CT1 & CT2 channel strainer. Set 50.00
45Gland packing of pumps/valves in DM plant, Final
Pond, ETP,. FP area, RWFP: Urea plant etc.No. 125.00
46
Replacement of slugde pumps at RWFP including
shifting from store & back, alignment of pump with
motor belt driven & air scoring blower at RWFP.
No. 1.00
8 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
47
Replacement of pond No. 3, ETP, Oily waste PP
House horizontal pumps, L.T Motor, including
aligning after shifting from workshop/store including
(ETP oily PPs area)
No. 1.00
48
Replacement of sludge/chemi pumps/Trickling
pump in pump house including shifting from
store/workshop/back (ETP/DP Plant) Alignment of
pumps of maxm. Cap 250 M3/hr. with L.T. Motor.
No. 1.00
49
CT1, CT2,pumps IGB 101, 102 and Fire pumps
H.T.Motor replacement after opening of bolts,
coupling bolts, after shifting from store/workshop/to
the plant and shifting of old motor to workshop/store
etc. after complete alignment and trial of equipment
.
No. 1.00
50
Opening ,Removing & fixing back of HT motors in
Urea Plant (GA 101) etc. at various locations. It
includes decoupling, lifting & taking out from
position, shifting to workshop, if necessary. Fixing
back in positioin, doing alignment to the
sastisfaction
a) Without removing coupling . No. 1.00
b)
Removing/replacing 1 or both coupling and
replacement of oil seal of gear box lif reqd. Crane,
trolly etc. required from the job will be provided by
NFL free of cost.
No. 1.00
JOB PERTAINING TO EARTH MOVING,
51
Replacement of gear box of dozer with new /
repaired gear box inculding desmentling and
assembly of oil lines, seat, battery, break & clutch
paddle and its levers and other allied job, if any.
EACH 7.00
52
Replacement of Engine of dozers with new /
repaired engine inculding desmentling and
assembly of oil lines, clucth assembly, UJ- cross,
paddle & lever assy, booster, centre arms and tilting
jack and oil lines, radiator fan, raditor and its hoses
and other
EACH 5.00
53
Servicing of Crane and other Heavy Earth moving
equipments. Job includes repalcement of all filters
of air, L.O, diesel and hydraulic oil system
including replacement of Lubricating/ hydraulic Oil.
Greaing of all greasing points adjustment/
replacemen
a) Servicing of dozer D80- A 12 EACH 20.00
b) Servicing of P&H 75 Te crane EACH 5.00
c) Servicing of coles crane 12T EACH 5.00
d) Service of escorts hydra cranes 8 Te cap, EACH 6.00
e) Service of escorts hydra cranes 3 Te cap, EACH 5.00
f) Servicing of potable Air compressor engine EACH 4.00
g) Servicing of potable Diesel Welding sets EACH 7.00
h) Servicing of locomotive engine WDS-4 model. EACH 5.00
9 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
54
Cleaning of radiator of dozer, Job includes removal
of radiator and its fan, cleaning of fins from outside
and assembly of the same. If requierd center arm is
also to be removed to take out the radiator.
EACH 13.00
55
Cleaning of air filter of dozers, Job includes
removal of of filter elements and cleaning of the
same with air and boxing up back.
EACH 50.00
56
Extension & Reduction of boom of 75 Te mobile
crane. Job inludes shifting of of extension piece to
site. Removal of hook, pins stay wires etc after
lowering the boom and fixing/ removal of the
extension piece and fixing the same. Extension &
reduction of boom.
EACH 5.00
BOWL MILL
57
OVERHAULING OF BOWL MILL COMPLETE. This
includes over hauling of all sub-assemblies
individually i.e jack bolts,spring assy. journal assy.,
Trunion bushes, Vertical shaft & Pan hub, Gear
Hub, Upper Bearing Housing holding body, worm
shaft assy., separator
NO. 15.00
58
Repair of upper half of mill without Replacement of
vertical shaft. This includes replacement of upper
bearing , bearing seals,deflactor etc. and
replacement of separator body liners, bull ring
segments, clamping plates repair, extention rings
repair .
NO. 7.00
59
Replacement of oil pump and lower bearings of
BOWL MILL including removal of bottom cover,
pulling out of old hub and bush of pump, installing
new hub and bush etc.
NO. 13.00
60Cleaning of Lub Oil cooler including removal and re-
fixing in Mill.NO. 8.00
61
Removal of Worm Shaft assembly, dismntling of
worm shaft assy and assembling with new/ old
bearing and bearing housings. Adjustment of its
clearance up to th required level & fixing the
assembly back on position and blue matching with
worm wheel. AlignmentAlignment up to the desired
level
NO. 17.00
62
Removal of Worm Shaft assembly & fixing back
new/ overhauled assembly and blue matching with
worm wheel. Alignment up to the desired level
NO. 4.00
63Driven & non drive ends side gland packing of worm
shaft assy .NO. 43.00
64
Replacement of Complete Coupling replacement of
Mill to Motor or Mill to Exhauster side and alignment
after that up to the desired level.
NO. 9.00
10 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
65
Replacement of One half Coupling replacement of
Mill to Motor or Mill to Exhauster side and alignment
after that up to the desired level.
NO. 14.00
66Replacement of complete set of 8 nos coupling
bolts of mill / motor and mill / exhauter coupling.SET 8.00
67Replacement of one coupling bolts of mill / motor
and mill / exhauter coupling.NO. 5.00
68
Replacement of complete Skirt assembly 3 parts
with scraper of Bowl mill. Job includes dismentling
of old skirt with scraper assembly and fixing the
new/ repaired Skirt assembly with scraper.
NO. 22.00
69
Replacement of 1/3 Skirt of Bearing/Seal housing.
Job includes dismentling of damaged part of the
skirt assembly and fixing the new/ repaired part
Skirt assembly with scraper.
NO. 5.00
70
Replacement of Scrapper of Bowl mill. Job inludes
removal of old scrapper and fixing back the new/
repaired scrapper
NO. 34.00
71
Inspection of scrapping of Bowl Mill. Job inludes
opening of inspection cover, tightening of bolts of
scraper as well as skirt assembly. Boxing up the
inspection cover back.
NO. 31.00
72
Replacement of Bull Ring Segments, job includes
removal of all the grindroll assy and centre disc.
Removal of old bull ring segments and fixing back
the new segments, centre disc, repair of extension
rings if required, fixing of grindroll assy and its adj
ST 27.00
73
Replacement of Grind Roll, job includes removal of
old grind roll assembly , removal of its old/ worn out
grind roll and fixing up of the new grind roll. Fixing
up of the assembly in position after cleaning of its
internals such as extension ring etc.
NO. 223.00
74Adjustment of Grind Roll gap with bowl with the
adjustment of spring assy etc.NO. 955.00
75
Overhauling of spring assy. Job includes
dismentling of spring assembly, cleaning and
inspection of its parts. Boxing up the assembly with
old/ new parts.
NO. 40.00
76
Overhauling of journal assy. Job includes opening
of the journel assembly, cleaning of all its parts and
boxing up with new or old spares including
adjustment of axial clearance as per the
requiremnt..
NO. 44.00
77
Cleaning of grind roll assy. Job includes opeing of
grind roll assembly from the Bowl mill, dismentling
of lower housing, cleaning of shaft and bearings,
boxing up the lower housing, adjustment of axial
play and fixing up the grind roll assembly back in
position.
NO. 28.00
78
Replacement with new convertor head. Job includes
removal of damaged convertor head after opening
of its couplings and fixing back the new/ repaired
convertor head. Fabricated/ repaired head will be
provided by NFL
NO. 5.00
11 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
79
Fabrication and replacement of converter head, Job
includes removal of damaged converter head after
opening of its couplings, fabrication of new
converter head as per drawing or site requirement
and fixing back the new/ repaired converter head.
Material
NO. 3.00
80
Alignment between Motor and Mill with Dail Gauge
up to recommanded level and as per the instruction
of Engineer-in-charge.
NO 12.00
81
Alignment between Mill and Exhauster with Dail
Gauge up to recommanded level and as per the
instruction of Engineer-in-charge.
NO 6.00
82
Taper matching of bowl hub with the shaft up to the
recommended level and as per the instruction of
Engineer-in-charge.
No. 6.00
83Taper matching of gear hub with the shaft up to the
recommended level and as per the instruction of
Engineer-in-charge.
No. 3.00
84
Fabrication and replacement of verticle extension
ring of Bowl mill. Job includes removal of grind roll
assembly for proper approch to repair the extension
ring, fixing of extension ring by cutting and welding
as per the site requirment or instruction of Engineer-
in-charge.
MR 90.00
85
Fabrication and replacement of Horizental
extension ring of Bowl mill. Job includes removal of
grin roll assembly for proper approch to repair the
extension ring, fixing of extension ring by cutting
and welding as per the site requirment or instruction
ofEngineer-in-charge.
MR 71.00
86Rotation of distributer out let P.F. Pipes 300 dia to
180 0 after opening the coupling.
NO. 32.00
87Picking of Stones / Metalic Pieces from Bowl Mill
after opening the mill inspection covers.NO 111.00
MILL EXHAUSTER
88
Replacement of Exhauster Bearing Housing. The
Job includes removal of the suction elbow , r end
cover, whizzerwheel & exhauster blades, removal of
the spider with hydraulic jack or by gas cutting,
decoupling of the mill and the exhauster, removal of
the
No. 8.00
89
Replacment of the Spider. Job includes removal of
the suction elbow, removal of the end cover,
removal of the whizzer wheel,exhauster blades,
spider by hydraulic jack orgas cutting, repair of
spider, if required, fixing the new/ repaired spider in
position.
No. 12.00
90
Replacement of exhauster blade and whizzer
angles. Job includes decoupling of the mill and
exhauster,removal of the manhole removal of the
old blades and whizzer wheel and whizzer angles,
fixing new blades and coverof exhauster, angles in
position,static
Per Set 20.00
91
Replacment job incudes, dismantling of suction
elbow, removal of end cover replacement of worn
out liners with new liners, replacement/ repair of the
hub (suction eye), replacement of throat liner &
boxing up of the exhauster.
NO 7.00
12 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
92
Repair jobs including dismantling of suction elbow,
removal of end cover,repair of worn out liner by
weld deposit or patch welding/ hard facing
replacement/ repair of hub (suction eye)
NO 9.00
93
Replacement of Circumfrential Periphery liner.
Opening of the top cover, opening of the manhole
cover, dismatling of top liners,above door liner
below door liner,throat liner (14Nos.) repair/ replace-
ment of above mentioned liners and boxing back.
93 (a) Per set of 14 liners. Set 6.00
93 (b)Per liner (Total payable amount shall be restricted
to the quoted cost per Set) No 230.00
94
Replacement of side Periphery Liner. Job includes
removal of the suction elbow, removal of the end
cover, removal of the worn out liners, replacement/
repair of liner & boxing up the exhauster.
(a) for complete set of liners (consisting of 14 pcs.) Per set 5.00
(b)for per liner (Total payable amount shall be
restricted to the quoted cost per Set)No. 127.00
95Repair of side Periphery Liner. Job includes
removal of the worn out liners & boxing up the liner
after necessary repair by Welding & hard facing
No. 23.00
96
Replacement of Suction Elbow. Job includes
removal of the old suction elbow, opening the
victraulic coupling, fixing the new elbow and box up.
No. 1.00
97
Repair of Suction Elbow.Job includes removal of
the suction elbow, opening the victraulic joint, repair
of the worn out portion by hard facing electrodes,
fixing back in position and boxing up. Hard facing
electrodes to be suppliedby NFL, free of costwher
No. 3.00
98
Dynamic Balancing of the Exhauster. Job includes
opening of manhole cover of exhauster, dynamic
balancing with the help of vibration measuring
instrument, boxing up manhole cover, (vibration
measurement and instruction for welding of weights
will be given
No. 45.00
99
Replacement of ED Valve. Job includes removal of
ED valve Assy. and fixing the new assy, back in
position.
No. 2.00
100
Replacement Of Refill Distributor (Big). Job includes
removal of flange joint, removal of old distributor (1
No.),fixing the new distributor in position & boxing
back of the flange joint and victraulic coupling joints.
No. 1.00
101
Replacement Of Refill Distributor (Small). Job
includes removal of flange joint,opening of victraulic
coupling. Removal of old distributor, fixing the new
distributor in position and boxing back of the flange
joint and victraulic coupling joints.
No. 1.00
102
Replacement of Refill Distributor Elements (Big).
Job includes opening of the inspection
coverremoval of the old element(2 Nos.) refixing the
new elements in poisition and boxing back.
13 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
102 (i) Per distributor Assy.(set of 2 nos.) Set 4.00
102 (ii)Per Element (Total payable amount shall be
restricted to the quoted cost per Set)No. 1.00
103
Replacement of Refill Distributor Elements (Small).
Job includes opening of the inspection cover,
removal of the old elements (4 Nos.) re-fixing the
new element in position & boxing back.
103 (i) Per distributor assy. (set of 4 nos.) Set 1.00
103 (ii)Per Element (Total payable amount shall be
restricted to the quoted cost per Set)No. 2.00
104
Replacement of Pulverised Fuel (PF) Liners
(Straight Line). Job includes removal of the worn
out pieces of the PF line by gas cutting,fabrication
erection of the new pipe pieces including marking
edge preparation,welding of stub ends, trans por-
tation l
Per Mtr. 107.00
105
Replacement of Pulverised Fuel (PF) Liners
CS/Ceramic lined/ basalt bends/Elbow of all angles.
Job includes removal of the old bends/ elbow by
gas cutting, fabrication and erection of the new
elbow including making elbow from pipe marking,
cutting edge
No. 37.00
106
Replacement of CI bend of all degrees. Job
includes removal of the old bends, erection of new
bend and boxing back.
No. 18.00
107R.C. Feeder flapper repair job inludes removal of
flappers and fixing back after repair.Each 41.00
108Replacement of RC Feeder Chain / Clinker Grinder
Chain.Each 15.00
109 Replacement of RC Feeder PIV Gearbox. No. 1.00
110Adjustment of speed variation of PIV Gear box of
RC FeederNo. 2.00
111Replacement of Eddy Current coupling gear box of
RC Feeder.No. 1.00
112 Replcement of RC Feeder clutch. No. 15.00
113Replacement of Feed Roll Spider assembly
complete.NO. 6.00
114Replacement of Feed Roll blades set. (one set of
Eight Nos.).SET 28.00
115Replacement of hinge gate assembly of R.C.
Feeder.NO. 3.00
116
Repair/replacement of damaged portion of the Coal
Burner Housing, Reciever and Inner piece of CPP
Boiler after removing Tee, Oil gun housing , Spider
etc and boxing up the same after repair.
NO. 1.00
117Gas cutting of Boiler surface/ skin casing repair of
MSsheet upto 6.0 mm thk. at all elevation.MR 79.00
118Welding of Boiler surface/ skin casing repair of
MSsheet upto 6.0 mm thk. at all elevation..MR 119.00
14 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
119
Indentification and repair/ plugging of Bank tubes of
SGP/ CPP boiler having OD 50mm. Job includes
identification of leaky tube, opening of manhole
covers Steam drum & Mud drum, fixing of plug on
both end of the tube and its sel welding and Boxing
up .
Inch dia. 8.00
120
Replacement of leaky tube piece of super heater of
varing lengths and 44.5 to 63.5mm O.D with X-ray
quality welding of SGP & CPP. Consumable like
electrodes etc shall be in the scope of contractor,
however excluding scaffolding.
Inch dia. 70.00
121
Replacement of leaky water wall tube piece of
varing lengths and 63.5 to 76.2mm O.D with X-ray
quality welding of SGP & CPP. Consumable like
electrodes etc shall be in the scope of contractor,
however excluding scaffolding.
Inch dia. 65.00
122
Replacement of leaky Economizer tube piece of
varing lengths and 63.5mm O.D with X-ray quality
welding of SGP & CPP. Consumable like electrodes
etc and scaffolding, wherever required shall be in
the scope of contractor.
Inch dia. 57.00
123
Replacement of sacrificial bends of Super heater/
Economiser. Job inludes removal of old bends by
cutting and fixing of new bends by welding. Bend
shall be provided by NFL free of cost. Minor
adjustment if required shall be carried by contractor.
No. 209.00
124
Sacrificial pipe/Cover of pipe Job inludes removal of
old pipe by cutting and fixing of new pipe by
welding. Bend shall be provided by NFL free of
cost. Minor adjustment if required shall be carried
by contractor.
MR 250.00
125
Cleat Repair of water wall tubes/super-
heater/economiser by cutting welding. Consumable
like electrodes etc shall be in the scope of
contractor, however excluding scaffolding.
No. 1.00
126Repair of water wall, super-heaster and
economiser tubes by overlay welding.Inch
2 2.00
127Buffing of cleats, welding portion for D.P. Testing
up to the satisfaction of Engineer-in-charge.Inch
2 20.00
128
Opening of manhole covers in SGP/CPP Boilers for
inspection and and boxing up of the same and to
make it leake proof afterward.
129
Opening of manhole covers of SGP/CPP Boilers
Drum for inspection and and boxing up of the same
and to make it leake proof afterward.
NO. 28.00
130Opening of manhole covers of ESP/ Ash hoppers in
SGP/CPP Boilers for inspection and and boxing up
of the same and to make it leake proof afterward.
NO. 300.00
131Opening of manhole covers of ID/ FD Fan in SGP
Boilers for inspection and and boxing up of the NO. 22.00
132
Replacement of Coal Nozzles. Job includes
dismantling of the old worn out coal burner, nozzles
Assy, tilting cover erection of the new assy. in
position & boxing up back with new and serviceable
bends and coal pipes.This includes assy.of coal
nozzles.
No. 36.00
15 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
133
Replacement of oil gun housingRemoval of the old
worn out oil gun housing assy. from the boiler tilting
corner, erection of the new assy./repaired Assy.in
positionand boxing back.
No. 3.00
134
Replacement of air Nozzles.Removal of the old
worn out air nozzle assy. from the boiler tilting
corner, and erection of the new Assy. in position
and box up back so as to operate from the tilting
mechanism.
No. 1.00
135Alignment of oil gun Assy, coal nozzle and air
nozzle vis-à-vis Flame Scanner in situ as per the
instruction of Engineer-in-charge.
No. 1.00
136
Repair of the furnance corner. Job includes
repair/replacement of nozzle oil gun housing
assemblies, air nozzles, replacement of tilting
corner levers,repair/ rectification of nozzles
compartment fully.
No. 1.00
137 Removal of stuck up HFO Gun SGP/CPP. No. 40.00
138
Hydro test of Boiler jobs including gaging/plugging
;of jall S/V (3 Nos), verifying the leakage of water
wall, Bank sss, economiser & super-heater tubes &
degagging S/V.
No. 12.00
139
Replacement of Hot Elements having height 42” or
(30” + 12”) and repair of grill and box as per
requirement – Type- A
No. 2.00
140
Replacement of Hot Elements having height 42” or
(30”+ 12”) and repair of grill and box as per
requirement - Type – B
No. 2.00
141Replacement of Hot Elements having height 42” or
(30” + 12”) and repair of grill and box as per
requirement - Type – C
No. 2.00
142 Repair of Inlet Duct MT 2.00
143Replacement of Hot End Elements having height
12” or 8”only Type - ANo. 2.00
144Replacement of Hot End Elements having height
12” or 8”only Type – BNo. 2.00
145Replacement of Hot End Elements having height
12” or 8”only Type – CNo. 2.00
146
Complete job having replacement of Hot End
Elements height 42” or (30” + 12”) Type- A, B & C
(12 Nos. Each) and repair of grill and box as per
requirement
ST 1.00
147 Repair of Grill & Box for Cold End Elements No. 12.00
148
Removal of struck up Wall deslagger soot blowers
(small soot blower) from position and fixing it back
after making it free to move. Job involves removal
of rack, replacement of swival tube of any parts
which cause jamming, witnessing the total run and
re
No. 30.00
149
Removal of struck up Long retraceable soot Blower
from position and fixing it back after making it free
to move. Job involves removal of rack, replacement
of swival tube of any parts which cause jamming,
witnessing the total run and rectification if any.
No. 1.00
16 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
150
Complete overhauling of Wall deslagger (small
soot blower), job involves removal of all parts/
assemblies, cleaning of all the parts & boxing with
reconditioned/ new parts as per directions of site
Incharge.
No. 1.00
151
omplete overhauling of Long retraceable soot
Blower, job involves removal of all parts/
assemblies, cleaning of all the parts & boxing with
reconditioned/ new parts as per directions of site
Incharge.
No. 1.00
152
ID/FD Fan damper replacement / repair for free
movement of vanes. Job includes dismentling of all
the vanes, cleaning of the vanes and boxing up and
final inspection to ensure the free movement opf the
vanes.
NO. 53.00
153Replacement BTM gear box job includes
replcement of couplings, alignment of motor to gear
box and gear box to BTM.
NO. 2.00
154
Overhauling of BTM gear box job included
dismentling of complete gear box, replacenment of
all wornoutgears and bearings and adjustment of
bearing clearances and backlash .
NO. 1.00
155Opening & boxing up of BTM resilient/ gear
coupling between Motor & gear box.NO. 1.00
156Opening & boxing up of BTM resilient/ gear
coupling between gearbox & Pinion shaft.NO. 1.00
157Alignment of resilient/ gear coupling between motor
& gear box.NO. 1.00
158Alignment of resilient/ gear coupling between BTM
& gear box.NO. 1.00
159Replacement of coupling between motor and gear
box, job includs replacement of coupling, alignment
of BTM resilient/gear coupling .
NO. 1.00
160
Replacement of coupling between gear box &
Pinion shaft, job includs replacement of coupling
alignment of BTM resilient/ gear .
NO. 1.00
161
Replacement of pinion shaft of BTM job includes
removal of cover, bearings etc from the old/ used
pinion shaft and fixing the same on the new/
repaired pinion shaft after making proper
adjustments up to required level and alignment with
the gear box.
NO. 1.00
162
Replacement of BTM motor job includes opening of
foundation bolts, removal of motor from position,
removal of it coupling, fixing of coupling on the
new/ overhaulled motor, Positioning of motor and
alignement between motor to gear box up to the
required
NO. 1.00
163 Replacement of Head liner Inner (approx.wt. 100
Kg.)NO. 17.00
164 Replacement of Head liner Outer (approx.wt. 90Kg.) NO. 15.00
165 Replacement of Shell Liner No.1 (Approx. wt. 168
Kg.)NO. 8.00
166 Replacement of Shell Liner No.2 (Approx. wt. 110
Kg.)NO. 5.00
167 Replacement of Shell Liner No.3 (Approx. wt. 171
Kg.)NO. 5.00
168Replacement of Shell Liner No.4 (Approx. wt. 114
Kg.)NO. 2.00
169Replacement of Shell Liner No.5 (Approx. wt. 171
Kg.)NO. 2.00
17 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
170Replacement of Shell Liner No.6 (Approx. wt. 114
Kg.)NO. 50.00
171 Replacement of one side air seal ring of BTM NO. 3.00
172 Replacement of BTM air seal of seal of both side NO. 14.00
173Replacement of CPP coal feeder bearings, job
inludes opening of end covers, removal of shaft,
dismentlting of bearings, fixing of new bearings etc
NO. 8.00
174 Removal, repair & Re-fitting of coal inlet/ outlet box. NO. 2.00
175Opening & boxing of manhole covers of BTM for
charging of grinding mediaNO. 51.00
176
BTM Ball Charging, Job includes opening of
manholes cover of both sides of BTM and boxing
after charging balls comprising of 32 drums of 850
kg each. For full charging 50% of the balls ball will
be charge through manhole and 50% charging
through charging
No. 1.00
177Replenishing the of Ball charging through ball
charging hopper. (One drum of balls consists of 850
kg.which shall be supplied by NFL free of cost.)
No. 90.00
178 Repair of Ball charging gate of BTM NO. 5.00
179
Replacement Coal Feeder Belt . Job includes
opening the end covers, removal of complete
arrangement out side from the feeder casing
removing the old belt and providing new belt in
position fixing back the total arrangement in side
and boxing up end covers
No. 16.00
180
Repair/Reconditioning of Idlers job inludes
dismentling of roller and assembly with new
bearings after cleaning.
No. 2.00
181Repair/replacement of secondary dry air vanes of
Burners.NO. 19.00
182Replacement/adjustment of operating rope of
secondary dry air vanes.NO. 3.00
183
Replacement of burnner housing, repair of
secondary air vanes. Job includes dismantling of PF
Tee, removal of complete burnner assy. alongwith
housing repairing secondary air vane before
providing new housing in position, replacing of coal
spreader with new.
NO. 7.00
184Replacement of coal spreader assy. Removed of
complete burner assy. From burner housing
removal of old spreader, fixing new one & box up
NO. 32.00
185 Replacement of Air Pre-heater rotating seal. NO. 63.00
186
Axu. Air damper repair which includes repair of
dampper plates by cutting & welding and making
the free movement of damppers.
NO. 34.00
187Clasifier vanes repair job inludes removal of clssifier
vane and fixing back after repair.Each 48.00
188
CPP, PA Fan casing repair, job inludes removal of
Rotor removal, repair casing and replacement of
liner plate box up & alignment up to the
recommanded level.
No. 2.00
189PA Fan (CPP) rating damper removal repair & fixing
of new/ repaired damper.No. 3.00
18 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
190 a
Replacement of CT Pump with Motor. Job includes
removal of Motor, removal of pump after openi ng of
all connecting lining. Placement of overhauled/ new
pump, connecting of lines and fixinf of Motor. Any
other allied job, if required, shall be in the scope
No. 2.00
190 b
Replacement of dewatering pump of CPP cooling
tower drain pit. Job involves opening of discharge
pipe bend, removing of motor & pump assy. from
position & fixing back the new/ overhauled pump
assy. motor, boxing up coupling with new or old
spider .
No. 2.00
191
Repair of in side system ESPs after making
scaffolding where ever required. Cutting and
welding , if required, shall be in the scope of
contractor
192Dismentling/removal the collecting Electrodes
plates of ESP.NO. 21.00
193 Errection of new/repaired collection plate. NO. 19.00
194 Dismantling & removal of Emitting Electrode NO. 1.00
195 Installation of Emitting Electrode NO. 4.00
196 Replacement of rapping hammer outer Arm. NO. 78.00
197 Repair & Replacement of Drive Shaft NO. 4.00
198Inspection/ replacement of Plain Bearing of
Ropping Drive ShaftNO. 18.00
199 Repair/ replcement of Guide rods (Tie rod) NO. 34.00
200 Repair Replcement of shock bar NO. 6.00
201 Replcement of Shock Bar NO. 1.00
202Replcement of Screw Scrapper of Insulator of
Rapping Drive for Emitting electrodeNO. 1.00
203 Repair & Replcement of Rapping derive Assy NO. 4.00
204Opening & Boxing up of Fludising Pads (Porous
Tiles) of Fly Ash HopperNO. 1.00
205Opening & Boxing -Up of B-B sleeve Coupling
Size150 mm diaNO. 31.00
206Opening & Boxing -Up of B-B sleeve Coupling Size
175 mm diaNO. 20.00
207Opening & Boxing -Up of B-B sleeve Coupling Size
200 mm diaNO. 31.00
208Opening & Boxing -Up of B-B sleeve Coupling Size
300 mm diaNO. 14.00
209Opening & Boxing -Up of B-C Adopter Sleeve
Coupling Size 150 mm diaNO. 2.00
210 Opening & Boxing -Up of B-C Adopter Sleeve
Coupling Size175 mm diaNO. 1.00
211Opening & Boxing -Up of B-C Adopter Sleeve
Coupling Size 200 mm diaNO. 2.00
212Opening & Boxing -Up of B-C Adopter Coupling of
Size175 mm diaNO. 2.00
213Opening & Boxing -Up of B-C Adopter Sleeve
Coupling of Size200 mm diaNO. 4.00
19 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
214Opening & Boxing -Up of B-C Adopter Sleeve
Coupling of Size300X200 mm diaNO. 4.00
215Rotation of CI FlyAsh pipeline(max length 5 m)
Size150 mm diaNO. 7.00
216Rotation of CI FlyAsh pipeline(max length 5 m)
Size175 mm diaNO. 1.00
217Rotation of CI FlyAsh pipeline(max length 5 m)
Size200mm diaNO. 2.00
218 Rotation of CI Ash Slurry pipeline Size200mm dia NO. 1.00
219Replacement of CI FlyAsh pipeline(max length 5 m)
Size150 mm diaNO. 4.00
220Replacement of CI FlyAsh pipeline(max length 5 m)
Size175 mm diaNO. 1.00
221Replacement of CI FlyAsh pipeline(max length 5 m)
Size200 mm diaNO. 5.00
222Replacement of CI FlyAsh pipeline(max length 5 m)
Size300 mm diaNO. 1.00
223 Replacement of CI Reducer size175X150 mm dia NO. 1.00
224 Replacement of CI Reducer size 200X175 mm dia NO. 1.00
225 Replacement of CI Reducer size 300X200 mm dia NO. 1.00
226Replacement of C.I. Elbow long redius, size 150
mm dia 900.
NO. 7.00
227Replacement of C.I. Elbow long redius, size 175
mm dia 450.
NO. 1.00
228Replacement of C.I. Elbow long redius, size 175
mm dia 900.
NO. 1.00
229Replacement of C.I. Elbow long redius, size 200
mm dia 450.
NO. 1.00
230Replacement of C.I. Elbow long redius, size 200
mm dia 900.
NO. 3.00
231Replacement of C.I. Elbow Flanged long redius,
size 200 mm dia 450.
NO. 1.00
232Replacement of C.I. Elbow Flanged long redius,
size 200 mm dia 900.
NO. 2.00
233Replacement of C.I. Elbow of Vacuum Breaker, size
200 mm dia 900.
NO. 2.00
234Replacement of inlet/outlet Elbow of Air Separator
Tank size 200 mm dia 900.
NO. 2.00
235Replacement of C.I. Elbow long redius size 300 mm
dia 300.
NO. 1.00
236Replacement of C.I. Elbow long redius size 300 mm
dia 450.
NO. 1.00
237Replacement of C.I. Elbow long redius size 300 mm
dia 900.
NO. 2.00
238 Replacement of C.I. Laterel size 175 mm dia 450. NO. 1.00
239 Replacement of C.I. Laterel size 300 mm dia 450. NO. 1.00
240 Replacement of C.I. Laterel size 200 mm dia 450. NO. 2.00
241Replacement of C.I. Laterel size 200x200x300 mm
dia 450.
NO. 1.00
242Replacement of C.I. Laterel size 200x300x300 mm
dia.NO. 1.00
243 Replacement of C.I. Equal Tee size 175 mm dia. NO. 1.00
244 Replacement of C.I. Equal Tee size 200 mm dia. NO. 1.00
245 Replacement of Expansion joint size 200 mm dia. NO. 1.00
20 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
246Replacement/Repair of Air Intake valve size 150
mm dia.NO. 2.00
247Replacement/Repair of Hand operated knife edge
gate isolation valve of fly ash hopper size 300 mm
dia.
NO. 1.00
248Repair and replacement of Ash Extraction valve
(Ash Intake valve) size 150 mm .NO. 50.00
249Repair and replacement of Ash Extraction valve
(Ash Intake valve) size 175 mm.NO. 34.00
250Replacement of Valve body along with disc of Ash
Extraction valve size 150 mm.NO. 18.00
251Replacement of Valve body along with disc of Ash
Extraction valve size 175 mm.NO. 8.00
252Replacement of Intake piece of Ash Extraction
valve size 150 mm dia.NO. 6.00
253Replacement of Intake piece of Ash Extraction
valve size 175 mm dia.NO. 2.00
254Replacement of Fly Ash Isolation valve (Header
valve) size 150 mm dia.NO. 15.00
255Replacement of Fly Ash Isolation valve (Header
valve) size 175 mm dia.NO. 7.00
256
Repair and replacement of totally enclosed rotary
slide gate valve size 200 mm dia in Fly Ash line
which includes removal of valve boxing up of valve
after repair.
NO. 1.00
257Repair/replacement of vacuum breaker assembly
size 150 mm dia.NO. 3.00
258Replacement of Exhauster hydrovector assembly
size 200mm dia (approx wt 400 Kg)NO. 6.00
259Replacement of CI water manifold (Throat) for
exhauster hydrovector size 200 mm diaNO. 1.00
260Replacement of CI Combining tube (tail piece) for
exhauster hydrovector 200mm diaNO. 1.00
261Replacement of Segment of air separator tank SGP
( approx. wt. 175 Kg.)NO. 5.00
262Replacement of Segment of air separator tank CPP
( approx. wt. 125 Kg.)NO. 1.00
263Replacement of hydraulic ejector assembly (Jet
pump assy.) of bottom Ash System (approx.wt.
275Kg.)
NO. 5.00
264Replacement of Inlet piece of hydraulic ejector of
bottom ash system.NO. 1.00
265Replacement of Combining tube of hydraulic ejector
of bottom ash system.NO. 6.00
266 Replacement of Butter Fly Valve, size 300 mm dia. NO. 3.00
267Replacement of Knief edge plate valve size 300 mm
dia.NO. 4.00
268Replacement of Bearing of Cliker Grinder including
related job i.e. gland packing and gear/sprocker
removal and fitting etc. of SG Plant.
NO. 5.00
269Clinker grinder bearing replacement including
related job i.e. gland packing and gear/sprocker
removal and fitting etc. of CPP boiler.
NO. 2.00
270Alignment of hydraulic cylinder of Sluice Gte Valve
of SGP and CPP Boilers as per the instruction of NO. 18.00
21 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
271Fab & Fixing of clamps on Ash Slurry/ water Line/
Carbon Slurry line 16" dia.NO. 2.00
272Fab & Fixing of clamps on Ash Slurry/ water Line/
Carbon Slurry line 12" dia.NO. 2.00
273Fab & Fixing of clamps on Ash Slurry/ water Line/
Carbon Slurry line 10" dia.NO. 2.00
274Fab & Fixing of clamps on Ash Slurry/ water Line/
Carbon Slurry line 8" dia.NO. 4.00
275
Removal of Ash Water pump Motor and shifting it to
Mechanical W/Shop for repair and to bring it back to
site and fixing back on position including alignment
up to the required level and coupling with pump.
No. 2.00
276
Removal of Ash Water pump and shifting it to
Mechanical W/Shop for repair and back to site and
fixing back on position and connecting of suction
and discharge line including aligning up to the
required level and coupling with pump.
No. 10.00
277Replacement of Balance Valve, Combined seat of
A.W.PNo. 3.00
278
Replacement of Victraulic coupling gasket Job
includes opening of the victreulic coupling joint of
old gasket, fitting new gasket and boxing back.
No. 2.00
279
Replacement of Clincker Grinder. The job includes
removal of old Clinker grinder from position, fixing
the new/old repaired CG brought from Stores/Mech.
W/Shop in position, making all cooling water
connections, repair of CG/Sluice valve gate
housing/body
No. 2.00
280 Replacement of Clinker Grinder Gearbox. No. 6.00
281
Replacement of gland packing in
Pumps/Agitators/Blowers/Gear Boxes etc.per shaft
diameter up to and including 3" dia, pr. Rating up to
15 kg./cm2 .
NO. 60.00
282
Replacement of gland packing in
Pumps/Agitators/Blowers/Gear Boxes etc.per shaft
diameter above 3" dia, pr. Rating up to 15 kg./cm2 .
NO. 6.00
283
Replacement of gland packing in
Pumps/Agitators/Blowers/Gear Boxes etc.per shaft
diameter up to and including 3" dia, pr. Rating up to
15 to 30 kg./cm2 .
NO. 2.00
284
Replacement of gland packing in
Pumps/Agitators/Blowers/Gear Boxes etc.per shaft
diameter above 3" dia, pr. Rating up to 15 to 30
kg./cm2 .
NO. 2.00
22 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
285Replacement of gland packing in valves rates as
per stem up to and including 1" Diameter, Pressure
rating up to and including 20kg/cm2 .
NO. 45.00
286Replacement of gland packing in valves rates as
per stem up to and including 2" Diameter, Pressure
rating up to and including 20kg/cm2.
NO. 4.00
287
Replacement of gland packing in valves rates as
per stem up to and including 1" Diameter, Pressure
rating up to and including 21 to 100 kg/cm2.
NO. 3.00
288
Replacement of gland packing in valves rates as
per stem up to and including 2" Diameter, Pressure
rating up to and including 21 to 100 kg/cm2.
NO. 3.00
289
Replacement of Conveyors 1, 2, 3, 4, 5, 6, ET-1,
ET-2, ET-4 & ET-6 gear box. Job includes removal
of the old gear box from the position, shifting the
same to main work shop for repair or to
stores.Bringing new / overhauled gear box from
stores/ Main workshop shifting to site at all elevation
EACH 6.00
290
Replacement of Conveyors ET-3, ET-5, Conveyor -
7 & Wing Conveyor no.3 gear box. Job includes
removal of the old gear box from the position,
shifting the same to main work shop for repair or to
stores.Bringing new / overhauled gear box from
stores/ Mainworkshop shifting to site at all elevation
EACH 7.00
291
Replacement of Conveyors PJD-120 gear box. Job
includes removal of the old gear box from the
position, shifting the same to main work shop for
repair or to stores.Bringing new / overhauled gear
box from stores/ Main workshop, shifting to site at
all elevation
EACH 1.00
292
Replacement of Conveyors PJD-101gear box. Job
includes removal of the old gear box from the
position, shifting the same to main work shop for
repair or to stores.Bringing new / overhauled gear
box from stores/ Main workshop, shifting to site at
all elevation
EACH 1.00
293
Replacement of Conveyors PJD-102, 103 gear box.
Job includes removal of the old gear box from the
position, shifting the same to main work shop for
repair or to stores.Bringing new / overhauled gear
box from stores/ Main workshop, shifting to site at
all
EACH 1.00
294
Replacement of Conveyors PJD-106, 109, 109A
gear box. Job includes removal of the old gear box
from the position, shifting the same to main work
shop for repair or to stores.Bringing new /
overhauled gear box from stores/ Main workshop,
shifting to site a
EACH 1.00
23 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
295
Replacement of Conveyors PJD-107 gear box. Job
includes removal of the old gear box from the
position, shifting the same to main work shop for
repair or to stores.Bringing new / overhauled gear
box from stores/ Main workshop, shifting to site at
all eleva
EACH 1.00
296
Overhauling of Gear Box, job inludes dismentling of
gear box, cleaning of all spares. Replacement of
worn out parts, adjustment of back lash up to the
recommanded level.
297
Overhauling of Gear Box of Belt Conveyor (BIG)
such as ET-1, ET-2, ET-4, Conv. # 1,2,3,4,5,6 etc.
The job inludes dismentling of gear box, cleaning of
all spares. Replacement of worn out parts,
adjustment of back lash up to the recommanded
level. Overhaul
Each 1.00
298
Overhauling of Gear Box of Belt Conveyor (Small)
such as ET-3, ET-5, W/G Box, PF travel Gear Box,
job inludes dismentling of gear box, cleaning of all
spares. Replacement of worn out parts, adjustment
of back lash up to the recommanded level.
Each 2.00
299
Re-alignment of motor to gear box and head end
pully of conveyor no 1,5,6, ET-2 and ET-4. After
removal of fluid coupling and refixing of coupling
after alignment.
Each 11.00
300Realignment of motor, gear box and head pully of
conveyor no 3,4,7,ET-1.3,5 and 6.Each 4.00
301
Inspection of conveyor bearing (Pillow block) which
include, opening top cover, washing with diesel,
boxed up aftr fresh grease.
302
Inspection of conveyor bearing (Pillow block) which
include, opening top cover, washing with diesel,
boxed up aftr fresh grease size up to 60mm ID of
the bearing.
NO. 3.00
303
Inspection of conveyor bearing (Pillow block) which
include, opening top cover, washing with diesel,
boxed up aftr fresh grease size above 60mm ID of
the bearing.
NO. 19.00
304
General Checking of paddle feeders of ET-1, Conv.
2, & 4. Job involves checking of coupling bolts,
resilient plate, multidisc assy., coupling of travel
drive assy., tightening of loose coupling bolts &
other bolts & their replacement, if required.
No. 18.00
305
Replacement of Fluid coupling of Belt conveyor of
size FCU10.5 to FCU16.25. Job inludes removal of
old coupling and fixing of New coupling after
checking of alignment and correction if required, up
to the recommanded level.
No. 8.00
306
Replacement of Fluid coupling of Coal Crusher of
size FCU26. Job inludes removal of old coupling
and fixing of New coupling after checking of
alignment and correction if required, up to the
recommanded level.
No. 3.00
307
Replacement of paddle feeder gear box including
alignment of motor & gear box and commissioning
back complete in all respects. This includes shifting
of gear box from workshop / stores to site and old
gear box from site to work shop.
NO 4.00
24 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
308
Repositioning of derailed paddle feeder / Tripper
Car of all conveyor. Job includes lifting of feeder
with the help of chain block and placing on rail. Any
allied job if required shall be in the scope of
contractor.
Each 2.00
309
Dismantling and repair of PF Blades of ET/-1/ Conv.
#4/ Conv. #2. Job includes removal of blade,
fabrication and replacement of plate of the hub and
edge of the blades etc.
Each 17.00
310
Off center atending of Belt Conveyor ET-1 to ET-6,
Conv. # 1 to Conv # 7. Job includes adjustment of
Tail end Pulley, Gravity take-up pulley, Bend pulley
etc. slot formation & providing of jack bolt if
required.
Each 39.00
311
Replacement of Conveyor Head Pulleys. Job
includes jamming/ fixing of the belt decoupling of
the pulley from gear box removal of the worn out
pulley, fixing of new pulley in position. Alignment of
the gear box and box up back.
312
Replacement of Head Pulleys Conveyor 400 mm
width. Job includes jamming/ fixing of the belt
decoupling of the pulley from gear box removal of
the worn out pulley, fixing of new pulley in position.
Alignment of the gear box and box up back.
NO. 1.00
313
Replacement of Head Pulleys Conveyor 600 mm
width. Job includes jamming/ fixing of the belt
decoupling of the pulley from gear box removal of
the worn out pulley, fixing of new pulley in position.
Alignment of the gear box and box up back.
" 1.00
314
Replacement of Head Pulleys Conveyor 750 mm
width. Job includes jamming/ fixing of the belt
decoupling of the pulley from gear box removal of
the worn out pulley, fixing of new pulley in position.
Alignment of the gear box and box up back
" 1.00
315
Replacement of Head Pulleys Conveyor 800 mm
width. Job includes jamming/ fixing of the belt
decoupling of the pulley from gear box removal of
the worn out pulley, fixing of new pulley in position.
Alignment of the gear box and box up back
" 2.00
316
Replacement of Head Pulleys Conveyor 1000 mm
width. Job includes jamming/ fixing of the belt
decoupling of the pulley from gear box removal of
the worn out pulley, fixing of new pulley in position.
Alignment of the gear box and box up back
" 10.00
317
Replacement of 400 mm wide conveyor Snub
pulley, tail end pulley, take up pulley and bend
pulley. Job includes jamming of the belt of fixed
place removal of the worn out pulleys,fixing of new
pulleys with bearings.
NO. 1.00
318
Replacement of 600 mm wide conveyor Snub
pulley, tail end pulley, take up pulley and bend
pulley. Job includes jamming of the belt of fixed
place removal of the worn out pulleys,fixing of new
pulleys with bearings.
" 2.00
25 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
319
Replacement of 750 mm wide conveyor Snub
pulley, tail end pulley, take up pulley and bend
pulley. Job includes jamming of the belt of fixed
place removal of the worn out pulleys,fixing of new
pulleys with bearings.
" 4.00
320
for 800 mm width conveyorReplacement of 800 mm
wide conveyor Snub pulley, tail end pulley, take up
pulley and bend pulley. Job includes jamming of the
belt of fixed place removal of the worn out
pulleys,fixing of new pulleys with bearings.
" 6.00
321
for 1000 mm width conveyor Replacement of 1000
mm wide conveyor Snub pulley, tail end pulley,
take up pulley and bend pulley . Job includes
jamming of the belt of fixed place removal of the
worn out pulleys,fixing of new pulleys with bearings.
" 11.00
322
Replacement of worn out unsplit/ split type, pillow
block/ plumberblock from snub/ head/ tail end
pulley, bend pulleys of belt conveyor, wing tripper &
tripping car after loosening of belt by lifting of
gravity take-up pulley, removal & installation of new.
323 (a) Upto 25 mm dia NO. 1.00
(b) Above 25 mm dia upto 50 mm dia " 14.00
(c ) Above 50 mm dia upto 75 mm dia " 34.00
(d) Above 75 mm dia upto 85 mm dia " 2.00
(e) Above 85 mm dia upto 90 mm dia " 1.00
(f) Above 90 mm dia upto 100 mm dia " 1.00
324
Erection of Snapped Conveyor Belt. Job inlcudes
positioning of belt to make it ready for vulcanising
joint which include lifting of gravity take up, cleaning
of belt both side, all allied jobs and pulling belt to
the required place of belt .
NO. 35.00
325
Replacement of new conveyor belt 1000MM wide.
Job includes removal of old belt, positioning of new
belt and all accociated job including of alignment of
belt required for the work and clip joint.
326
Replacement of new conveyor belt 1000MM wide.
Job includes removal of old belt, positioning of new
belt and all accociated job including of alignment of
belt required for the work and clip joint.
RM 1200.00
327
Replacement of new conveyor belt 800MM wide.
Job includes removal of old belt, positioning of new
belt and all accociated job including of alignment of
belt required for the work and clip joint.
" 250.00
328
Replacement of new conveyor belt 750MM wide.
Job includes removal of old belt, positioning of new
belt and all accociated job including of alignment of
belt required for the work and clip joint.
" 130.00
26 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
329
Replacement of new conveyor belt 600MM wide.
Job includes removal of old belt, positioning of new
belt and all accociated job including of alignment of
belt required for the work and clip joint.
" 20.00
330
Replacement of new conveyor belt 400MM wide.
Job includes removal of old belt, positioning of new
belt and all accociated job including of alignment of
belt required for the work and clip joint.
" 21.00
331
Positioning of snapped belt which includes picking
of belt, placing it back to the required place with all
allied activity. Length will be counted from the place
from where belt is picked up to the joint place.
332
Positioning of snapped conveyor belt 1000 MM
wide. Job includes picking of belt, placing it back to
the required place with all allied activity. Length will
be counted from the place from where belt is picked
up to the joint place.
RM 650.00
333
Positioning of snapped conveyor belt 800 MM wide.
Job includes picking of belt, placing it back to the
required place with all allied activity. Length will be
counted from the place from where belt is picked up
to the joint place.
" 200.00
334
Positioning of snapped conveyor belt 750 MM wide.
Job includes picking of belt, placing it back to the
required place with all allied activity. Length will be
counted from the place from where belt is picked up
to the joint place.
" 26.00
335
Positioning of snapped conveyor belt 600 MM wide.
Job includes picking of belt, placing it back to the
required place with all allied activity. Length will be
counted from the place from where belt is picked up
to the joint place.
" 5.00
336
Positioning of snapped conveyor belt 400 MM wide.
Job includes picking of belt, placing it back to the
required place with all allied activity. Length will be
counted from the place from where belt is picked up
to the joint place.
" 5.00
337
Clip Jointing of 1000 mm wide conveyor belt. Job
includes lifting of gravity take up pulley, pulling of
belt to its position, making of staight ends by cutting
the belt, clip joining of belt. and setting the inluding
training the belt if required.
No. 22.00
338
Clip Jointing of 800 mm wide conveyor belt. Job
includes lifting of gravity take up pulley, pulling of
belt to its position, making of staight ends by cutting
the belt, clip joining of belt. and setting the inluding
training the belt if required.
" 5.00
339
Clip Jointing of 750 mm wide conveyor belt. Job
includes lifting of gravity take up pulley, pulling of
belt to its position, making of staight ends by cutting
the belt, clip joining of belt. and setting the inluding
training the belt if required.
" 5.00
27 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
340
Clip Jointing of 600 mm wide conveyor belt. Job
includes lifting of gravity take up pulley, pulling of
belt to its position, making of staight ends by cutting
the belt, clip joining of belt. and setting the inluding
training the belt if required.
" 1.00
341
Clip Jointing of 400 mm wide conveyor belt. Job
includes lifting of gravity take up pulley, pulling of
belt to its position, making of staight ends by cutting
the belt, clip joining of belt. and setting the inluding
training the belt if required.
" 1.00
342
Longitudinal / transverse clip fastener joint Up to
and including 1 (one) running meter length. Job
includes lifting of gravity take up pulley and putting
clamps on belt, if required, placement of the belt on
position and training of the belt
No. 1.00
343
Longitudinal / transverse clip fastener joint per
running meter length. Job includes lifting of gravity
take up pulley and putting clamps on belt, if
required, placement of the belt on position and
training of the belt
RM 1.00
344
Replacement of the old rollers from the roller
bracket, fixing the new roller or repaired roller in
position.This covers all type of rollers including old
rollers after making them free.
No. 1150.00
345
Replacement/ repair of the bracket assembly
replacement/ repair of the bracket and boxing up
back in position with rollers.
230.00
346Replacement with new or repaired impact pads
bracket including re-centring of belt.NO 22.00
347Replacement of coal chute plates by cutting and
welding.M
2 32.00
348
Repair of chuite duct, PF bend boxes, deck plate,
hopper etc. by patch welding which includes making
of scaffolding, cutting of old plate at all elevations.
MR 665.00
349Fabrication and instalation of side Rubber Skirts on
convertor including repair of skirts holders.RM 27.00
350 Replacement of side skirt rubber portion only. RM 443.00
351
Fabrication of deck plate for Conveyors out of M.S.
plates thickness 3 mm to 6mm and sizes 1400 x
1350 mm by cutting and welding. MS plate shall be
provided by NFL free of cost.
No. 18.00
352
Fabrication of deck plate for Conveyors out of M.S.
plates thickness 3 mm to 6mm and sizes 1400 x
1200 mm by cutting and welding. MS plate shall be
provided by NFL free of cost.
No. 17.00
353
Fabrication of deck plate for Conveyors out of M.S.
plates thickness 3 mm to 6mm and sizes 1500 x
1100 mm by cutting and welding. MS plate shall be
provided by NFL free of cost.
No. 36.00
354
Fabrication of deck plate for Conveyors out of M.S.
plates thickness 3 mm to 6mm and sizes 1400 x
1100 mm by cutting and welding. MS plate shall be
provided by NFL free of cost.
No. 10.00
28 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
355
Replacement of Deck plates. Job involves removal
of impact/ troughing roller assemblies, old/
damaged deck plates, fixing the new deckplate in
position fixing back the new/old impact/ troughing
roller assemblies with new/ old rollers in position.
No. 65.00
356
Replacement/ repair of rubber/ plastic lining of
hopper/chutes surface by drilling and bolting of MS
plate. Erection of scaffolding etc if required shall be
in the scope of contractor.
m2 2.00
357
Replacement of dewatering pump of Ash water
pump house, Conv. 4, Conv.5, Conv. 1, ET-2 etc.
Job includes dismentling of the pump & its motor
from position and fixing on overhauled pump motor.
Each 8.00
358
Replacement of Magnetic belt gearbox / Tripper
Gearbox / P.F. Drive Gearbox. Job includes
reemoval of old gear box, removal of couplinf ,
fixing of coupling on new gear box. Placement of
Each 5.00
359
Complete overhauling of hammer Crusher (HC).
Job includes Assy. of rotor from old / new parts
then boxing up the crusher with new / old spares,
correction of bearing base, fixing of chutes in
position, alingnment of rotor and motor and fixing
up of Fl
No. 9.00
360
Replacement of Crusher Hammer. Job involves
opening the covers of the crusher, plugs, removal of
the suspension bar, fixing the new ring hammers
(Toothed and ring) in positionand boxing up the
crusher.
(a)Complete set of crusher hammers (thoothed and
ring )set of 56 pcs.ST 17.00
(b)Per hammer (total payable amount should not
exceed the amount payable for set.No. 17.00
361 Replacement of cage bars (set of 9 Nos.). ST 10.00
362 Replacement of per No. cage bar. NO 57.00
363 Replacement of Screw plate. NO 2.00
364 Replacement of cage breaker plate. NO 9.00
365 Replacement of crusher & motor. NO 1.00
366
Replacement of out board Bearing Crusher in Coal
Handling Plant. Job includes Lifting the rotor if
reqd., removal of split plummer block after
dismantling the bolts, old damaged brg. to be
removed and box up with new brg pro-perly
greased. Lower down the
No. 9.00
367
Replacement of in board Bearing Crusher in Coal
Handling Plant. Job includes removal of V-Belts,
pulley/ Hydraulic coupling, lifting the rotor if reqd.
removal of split plummer block after dismantling the
bolts, old damaged brg. to be removed and box up
with new one.
No. 12.00
368
General Checking of coal crushers. Job involves
opening of covers, checking of cage bars, bolts,
removal of foreign material, stones etc., tightening
or tag welding of bolts etc. & boxing up of covers.
No. 65.00
29 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
LOAD TESTING OF CRANES,CHAIN BLOCKS,
SLINGS & D-SHACKLES ETC. AND
EXAMINATION. TESTING OF PRESSURE
VESSEL
369
Load testing of Cranes,Chain Blocks,Slings,D
Shackles etc. and to be got certified from any one
Competent Person authorized by Director of
Factories (Pb) Scope of Work for Load Testing is as
per Annexure I
a MOBILE CRANES
a (i) Tata crane, Kato Crane, Etc. 75 T to 120 T No. 2.00
a (ii) Hydra Cranes, Coles crane, Etc. 3T to 12.5 T No. 6.00
b EOT CRANES
b (i) CPP T.G. House 45 T No. 1.00
b (ii) CPP T.G. House 15 T No. 1.00
b (iii) Ammonia Compressor house 25 T No. 2.00
b (iv) Ammonia Compressor house 5 T No. 2.00
b (v) Urea Compressor house 20 T No. 1.00
b (vi) Urea Centrifuge and Bagging Plant 3T No. 2.00
b (vii) O & U Compressor House and Urea Plant 5T No. 2.00
b (viii) Central Work Shop 10 T No. 1.00
c ELECTRICAL CRANE HOISTING
c (i)CPP Ash Slurry Pump House 7.5 T,CPP 36 Mr,
SGP AWP House 5TNo. 4.00
c (ii)
Urea Reactor,SGP &Coal Handling Plant 3T
(2No),RWFP (Alum House) .5 T 1No.,ACB
Lift Trolly in Ammonia and O&U Plant (3No.)
No. 6.00
d MONO RAIL CHAIN PULLEY BLOCKS
d (i) CPP & SGP 5T No. 3.00
d (ii)
In various plants 3T(19 No.),Ammonia
2T(5No.),O&U/ETP/D.G.set 1T (3no.),CPP APH .5T
(1No.)
No. 28.00
e CHAIN PULLEY BLOCKS
e (i)Chain Pulley Blocks .5T to 2T at different locations
in the plantNo. 35.00
e (ii)Chain Pulley Blocks 3T to 10T at different locations
in the plantNo. 12.00
e (iii)Zib Cranes,Fabricated Jhoola,Mech.Winch, V
Groove Pulleys at different locations .5T to 5TNo. 25.00
e (iv) D Shackle 2T to 25T (106 N0.) No. 105.00
e (v) Wire Ropes .5T to 50 T (167No.) No. 167.00
f LIFT
f (i)Lift (P.Elvt.) CPP & Urea .4T to .884 T (Two times
in a Year)No. 2.00
f (ii) Hand Lftg Table,Pallet No. 2.00
30 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer
DESCRIPTION UNIT EST. QTY
RATE AMOUNT RATE AMOUNT
IN FIGURE IN WORDSSr.No.
g PRESSURE VESSELS TESTING
g (i)
Examination and Testing of Pressure Vessels at
different locations Ammonia,Urea,DM Plant etc. and
Certification by competent Person approved by
Director of Factories Punjab as per Scope of work.
No. 118.00
LABOUR RATES
(FOR NORMAL WORKING HRS. )
370 Welder ( IBR) Hrs 170.00
371 Welder (Non IBR) Hrs 4200.00
372 Gas cuttor Hrs 1050.00
373 Rigger Hrs 11000.00
374 Fitter Hrs 2650.00
375 Auto Electrician Hrs 2550.00
376 Semi Skilled Hrs 77000.00
377 Unskilled Hrs 13364.00
378 Crane operators for 3 Te th 15 Te cap Crane Hrs 5250.00
379Operators for Crane above 15 Te to 75 Te cap
CraneHrs 300.00
380Operators for Crane above 75 Te to 120 Te cap
CraneHrs 240.00
381 Tractor Operator Hrs 2600.00
LABOUR RATES ( FOR OVERTIME )
382 Welder ( IBR) Hrs 17.00
383 Welder (Non IBR) Hrs 420.00
384 Gas cuttor Hrs 105.00
385 Rigger Hrs 1100.00
386 Fitter Hrs 265.00
387 Auto Electrician Hrs 255.00
388 Semi Skilled Hrs 7700.00
389 Unskilled Hrs 1336.00
390 Crane operators for 3 Te th 15 Te cap Crane Hrs 525.00
391Operators for Crane above 15 Te to 75 Te cap
CraneHrs 30.00
392Operators for Crane above 75 Te to 120 Te cap
CraneHrs 24.00
393 Tractor Operator Hrs 260.00
TOTAL `TOTAL `TOTAL `TOTAL `
31 of 31 Schedule of Quantities For ARC Misc. Mech Maint. Jobs 2013-14 Signature of Tenderer